Sample records for electric generating plants

  1. Vogtle Electric Generating Plant ETE Analysis Review

    Energy Technology Data Exchange (ETDEWEB)

    Diediker, Nona H.; Jones, Joe A.

    2006-12-09

    Under contract with the Nuclear Regulatory Commission (NRC), staff from Pacific Northwest National Laboratory (PNNL) and Sandia National Laboratory (SNL)-Albuquerque reviewed the evacuation time estimate (ETE) analysis dated April 2006 prepared by IEM for the Vogtle Electric Generating Plant (VEGP). The ETE analysis was reviewed for consistency with federal regulations using the NRC guidelines in Review Standard (RS)-002, Supplement 2 and Appendix 4 to NUREG-0654, and NUREG/CR-4831. Additional sources of information referenced in the analysis and used in the review included NUREG/CR-6863 and NUREG/CR-6864. The PNNL report includes general comments, data needs or clarifications, and requests for additional information (RAI) resulting from review of the ETE analysis.

  2. The PBMR electric power generation plant

    International Nuclear Information System (INIS)

    Perez S, G.; Santacruz I, I.; Martin del Campo M, C.

    2003-01-01

    This work has as purpose to diffuse in a general way the technology of the one modulate reactor of pebble bed. Because our country is in developing ways, the electric power demand goes in increase with that which it is presented the great challenge of satisfying this necessity, not only being in charge of the one fact per se, but also involving the environmental aspect and of security. Both factors are covered by the PBMR technology, which we approach in their basic aspects with the purpose that the public opinion knows it and was familiarized with this type of reactors that well could represent a solution for our growing electricity demand. We will treat this reactor visualizing it like part of a generation plant defining in first place to the itself reactor. We will see because that the system PBMR consists of 2 main sections: the reactor and the unit of energy conversion, highlighting that the principle of the PBMR reactor operation is based on the thermodynamic Brayton cycle cooled by helium and that, in turn, it transmits the energy in form of heat toward a gas turbine. In what concerns to the fuel, it peculiar design due to its spherical geometry is described, aspect that make to this reactor different from the traditional ones that use fuel rods. In fact in the fuel spheres of the PBMR it is where it resides great part of it inherent security since each particle of fuel, consistent in uranium dioxide, is lined one with coal and silicon carbide those which form an impenetrable barrier containing to the fuel and those radioactive products that result of the nuclear reactions. Such particles are encapsulated in graphite to form the sphere or 'pebble', of here born the name of this innovative technology. (Author)

  3. Vibrations measurement at the Embalse nuclear power plant's electrical generator

    International Nuclear Information System (INIS)

    Salomoni, R.C.; Belinco, C.G.; Pastorini, A.J.; Sacchi, M.A.

    1987-01-01

    After the modifications made at the Embalse nuclear power plant's electrical generator to reduce its vibration level produced by electromagnetic phenomena, it was necessary to perform measurements at the new levels, under different areas and power conditions. To this purpose, a work was performed jointly with the 'Vibrations Team' of the ANSALDO Company (the generator constructor) and the Hydrodynamic Assays Division under the coordination and supervision of the plant's electrical maintenance responsible. This paper includes the main results obtained and the instrumentation criteria and analysis performed. (Author)

  4. Simulation of gaseous emissions from electricity generating plant

    International Nuclear Information System (INIS)

    Bellhouse, G.M.; Whittington, H.W.

    1996-01-01

    In electricity supply networks, traditional dispatch algorithms are based on features such as economics and plant availability. Annual limits on emissions from fossil-fuelled stations are regarded as a restriction and set a ceiling on generation from particular stations. With the impending introduction of financial penalties on emissions, for example cal bon taxation, algorithms will have to be developed which allow the dispatch engineer to assess the cost in real-time of different generation options involving fossil-fuelled plants. Such an algorithm is described in this paper. (UK)

  5. Improvements in steam cycle electric power generating plants

    International Nuclear Information System (INIS)

    Bienvenu, Claude.

    1973-01-01

    The invention relates to a steam cycle electric energy generating plants of the type comprising a fossil or nuclear fuel boiler for generating steam and a turbo alternator group, the turbine of which is fed by the boiler steam. The improvement is characterized in that use is made of a second energy generating group in which a fluid (e.g. ammoniac) undergoes a condensation cycle the heat source of said cycle being obtained through a direct or indirect heat exchange with a portion of the boiler generated steam whereby it is possible without overloading the turbo-alternator group, to accomodate any increase of the boiler power resulting from the use of another fuel while maintaining a maximum energy output. This can be applied to electric power stations [fr

  6. AVESTAR Center for Operational Excellence of Electricity Generation Plants

    Energy Technology Data Exchange (ETDEWEB)

    Zitney, Stephen

    2012-08-29

    To address industry challenges in attaining operational excellence for electricity generation plants, the U.S. Department of Energy’s (DOE) National Energy Technology Laboratory (NETL) has launched a world-class facility for Advanced Virtual Energy Simulation Training and Research (AVESTARTM). This presentation will highlight the AVESTARTM Center simulators, facilities, and comprehensive training, education, and research programs focused on the operation and control of high-efficiency, near-zero-emission electricity generation plants. The AVESTAR Center brings together state-of-the-art, real-time, high-fidelity dynamic simulators with full-scope operator training systems (OTSs) and 3D virtual immersive training systems (ITSs) into an integrated energy plant and control room environment. AVESTAR’s initial offering combines--for the first time--a “gasification with CO2 capture” process simulator with a “combined-cycle” power simulator together in a single OTS/ITS solution for an integrated gasification combined cycle (IGCC) power plant with carbon dioxide (CO2) capture. IGCC systems are an attractive technology option for power generation, especially when capturing and storing CO2 is necessary to satisfy emission targets. The AVESTAR training program offers a variety of courses that merge classroom learning, simulator-based OTS learning in a control-room operations environment, and immersive learning in the interactive 3D virtual plant environment or ITS. All of the courses introduce trainees to base-load plant operation, control, startups, and shutdowns. Advanced courses require participants to become familiar with coordinated control, fuel switching, power-demand load shedding, and load following, as well as to problem solve equipment and process malfunctions. Designed to ensure work force development, training is offered for control room and plant field operators, as well as engineers and managers. Such comprehensive simulator-based instruction allows

  7. Water releasing electric generating device for nuclear power plant

    International Nuclear Information System (INIS)

    Umehara, Toshihiro; Tomohara, Yasutaka; Usui, Yoshihiko.

    1994-01-01

    Warm sea water discharged after being used for cooling in an equipment of a coastal nuclear powder plant is discharged from a water discharge port to a water discharge pit, and a conduit vessel is disposed in front of the water discharge port for receiving overflown warm sea water. The warm sea water taken to the conduit vessel is converted to a fallen flow and charged to a turbine generator under water, and electric power is generated by the water head energy of the fallen flow before it is discharged to the water discharge pit. The conduit vessel incorporates a foam preventing unit having spiral flow channels therein, so that the warm sea water taken to the conduit vessel is flown into the water discharge pit after consuming the water head energy while partially branched and flown downwardly and gives lateral component to the downwarding flowing direction. Then, warm sea water is made calm when it is flown into the water discharge pit and, accordingly, generation of bubbles on the water surface of the water discharge pit is avoided. (N.H.)

  8. Act No. 880 of 18 December 1973 on the siting of electricity generating plants

    International Nuclear Information System (INIS)

    1974-01-01

    This Act which governs the siting of plants generating all types of electricity provides the basis for Act No. 393 of 2 August 1975 which specifically concerns the siting of nuclear elecricity generating plants. (NEA) [fr

  9. Electric power generating plant having direct coupled steam and compressed air cycles

    Science.gov (United States)

    Drost, Monte K.

    1982-01-01

    An electric power generating plant is provided with a Compressed Air Energy Storage (CAES) system which is directly coupled to the steam cycle of the generating plant. The CAES system is charged by the steam boiler during off peak hours, and drives a separate generator during peak load hours. The steam boiler load is thereby levelized throughout an operating day.

  10. Electric power generating plant having direct-coupled steam and compressed-air cycles

    Science.gov (United States)

    Drost, M.K.

    1981-01-07

    An electric power generating plant is provided with a Compressed Air Energy Storage (CAES) system which is directly coupled to the steam cycle of the generating plant. The CAES system is charged by the steam boiler during off peak hours, and drives a separate generator during peak load hours. The steam boiler load is thereby levelized throughout an operating day.

  11. 78 FR 53483 - Inspections, Tests, Analyses, and Acceptance Criteria; Vogtle Electric Generating Plant, Unit 3

    Science.gov (United States)

    2013-08-29

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 052-00025; NRC-2008-0252] Inspections, Tests, Analyses, and Acceptance Criteria; Vogtle Electric Generating Plant, Unit 3 AGENCY: Nuclear Regulatory Commission. ACTION: Determination of inspections, tests, analyses, and acceptance criteria (ITAAC) completion...

  12. 78 FR 53484 - Inspections, Tests, Analyses, and Acceptance Criteria; Vogtle Electric Generating Plant, Unit 4

    Science.gov (United States)

    2013-08-29

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 052-00026; NRC-2008-0252] Inspections, Tests, Analyses, and Acceptance Criteria; Vogtle Electric Generating Plant, Unit 4 AGENCY: Nuclear Regulatory Commission. ACTION: Determination of inspections, tests, analyses, and acceptance criteria (ITAAC) completion...

  13. 78 FR 65007 - Inspections, Tests, Analyses, and Acceptance Criteria; Vogtle Electric Generating Plant, Unit 3

    Science.gov (United States)

    2013-10-30

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 052-00026; NRC-2008-0252] Inspections, Tests, Analyses, and Acceptance Criteria; Vogtle Electric Generating Plant, Unit 3 AGENCY: Nuclear Regulatory Commission. ACTION: Determination of inspections, tests, analyses, and acceptance criteria completion...

  14. Technology data for electricity and heat generating plants

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-03-01

    The Danish Energy Authority and the two Danish electricity transmission and system operators, Elkraft System and Eltra, initiated updating of current technology catalogues in 2003. The first updated catalogue was published in March 2004. This report presents the results of the second phase of updating. The primary objective has been to establish a uniform, commonly accepted and up-to-date basis for energy planning activities, such as future outlooks, evaluations of security of supply and environmental impacts, climate change evaluations, and technical and economic analyses. The catalogue may furthermore be used as reference for evaluations of the development perspectives for the numerous technologies available for energy generation in relation to the programming of funding schemes for research, development and demonstration of emerging technologies. It has finally been the intention to offer the catalogue for the international audience, as a contribution to similar initiates aiming at forming a public and concerted knowledge base for international analyses and negotiations. A guiding principle for developing the catalogue has been to primarily rely on well-documented and public information, secondarily on invited expert advice. Since many experts are reluctant in estimating future quantitative performance data, the data tables are not complete, in the sense that most data tables show several blank spaces. This approach has been chosen in order to achieve data, which to some extent are equivalently reliable, rather than to risk a largely incoherent data set including unfounded guesses. (au)

  15. Fitting of power generated by nuclear power plants into the Hungarian electricity system

    International Nuclear Information System (INIS)

    Lengyel, Gyula; Potecz, Bela

    1984-01-01

    The moderate increase of electrical energy demands (3% at present) can only be met by the parallel application of fossil and nuclear power plants and by electric power import via the transmission lines of the CMEA countries. The changes in the electrical energy and fuel demands and the development of the available capacities during the last 35 years are reviewed. The major purpose of Hungarian power economy is to save hydrocarbon fuels by taking advantages of power import opportunities by operating nuclear power plants at maximum capacity and the coal fired power stations at high capacity. The basic principles, the algorithm applied to optimize the load distribution of the electrical power system are discussed in detail with special attention to the role of nuclear power. The planned availability of nuclear power plants and the amount of electricity generated by nuclear plants should also be optimized. (V.N.)

  16. Investigating the water consumption for electricity generation at Turkish power plants

    Science.gov (United States)

    El-Khozondar, Balkess; Aydinalp Koksal, Merih

    2017-11-01

    The water-energy intertwined relationship has recently gained more importance due to the high water consumption in the energy sector and to the limited availability of the water resources. The energy and electricity demand of Turkey is increasing rapidly in the last two decades. More thermal power plants are expected to be built in the near future to supply the rapidly increasing demand in Turkey which will put pressure on water availability. In this study, the water consumption for electricity generation at Turkish power plants is investigated. The main objectives of this study are to identify the amount of water consumed to generate 1 kWh of electricity for each generation technology currently used in Turkey and to investigate ways to reduce the water consumption at power plants expected to be built in the near future to supply the increasing demand. The various electricity generation technology mixture scenarios are analyzed to determine the future total and per generation water consumption, and water savings based on changes of cooling systems used for each technology. The Long-range Energy Alternatives Planning (LEAP) program is used to determine the minimum water consuming electricity generation technology mixtures using optimization approaches between 2017 and 2035.

  17. UF6 breeder reactor power plants for electric power generation

    International Nuclear Information System (INIS)

    Rust, J.H.; Clement, J.D.; Hohl, F.

    1976-01-01

    The reactor concept analyzed is a 233 UF 6 core surrounded by a molten salt (Li 7 F, BeF 2 , ThF 4 ) blanket. Nuclear survey calculations were carried out for both spherical and cylindrical geometries. A maximum breeding ratio of 1.22 was found. Thermodynamic cycle calculations were performed for a variety of Rankine cycles. Optimization of a Rankine cycle for a gas core breeder reactor employing an intermediate heat exchanger gave a maximum efficiency of 37 percent. A conceptual design is presented along with a system layout for a 1000 MW stationary power plant. The advantages of the GCBR are as follows: (1) high efficiency, (2) simplified on-line reprocessing, (3) inherent safety considerations, (4) high breeding ratio, (5) possibility of burning all or most of the long-lived nuclear waste actinides, and (6) possibility of extrapolating the technology to higher temperatures and MHD direct conversion

  18. Resolution 147/012. It authorize the Central Libertador / SA aeolian generation company to generate an aeolian electricity source by an electric power generating plant located in Maldonado town 4 AA Catastral section, and the Sistema inerconectado Nacional connection

    International Nuclear Information System (INIS)

    2012-01-01

    This decree authorizes the generation of electricity using aeolian energy as the primary electricity source. This project was presented by the 'Libertador / S.A' aeolian generation company with the proposal to install an electrical plant in Maldonado town. This authorization is according to the Electric Wholesale Market regulation

  19. Determination of leveled costs of electric generation for gas plants, coal and nuclear

    International Nuclear Information System (INIS)

    Alonso V, G.; Palacios H, J.C.; Ramirez S, J.R.; Gomez, A.

    2005-01-01

    The present work analyzes the leveled costs of electric generation for different types of nuclear reactors known as Generation III, these costs are compared with the leveled costs of electric generation of plants with the help of natural gas and coal. In the study several discount rates were used to determine their impact in the initial investment. The obtained results are comparable with similar studies and they show that it has more than enough the base of the leveled cost the nuclear option it is quite competitive in Mexico. Also in this study it is also thinks about the economic viability of a new nuclear power station in Mexico. (Author)

  20. [Negative air ions generated by plants upon pulsed electric field stimulation applied to soil].

    Science.gov (United States)

    Wu, Ren-ye; Deng, Chuan-yuan; Yang, Zhi-jian; Weng, Hai-yong; Zhu, Tie-jun-rong; Zheng, Jin-gui

    2015-02-01

    This paper investigated the capacity of plants (Schlumbergera truncata, Aloe vera var. chinensis, Chlorophytum comosum, Schlumbergera bridgesii, Gymnocalycium mihanovichii var. friedrichii, Aspidistra elatior, Cymbidium kanran, Echinocactus grusonii, Agave americana var. marginata, Asparagus setaceus) to generate negative air ions (NAI) under pulsed electric field stimulation. The results showed that single plant generated low amounts of NAI in natural condition. The capacity of C. comosum and G. mihanovichii var. friedrichii generated most NAI among the above ten species, with a daily average of 43 ion · cm(-3). The least one was A. americana var. marginata with the value of 19 ion · cm(-3). When proper pulsed electric field stimulation was applied to soil, the NAI of ten plant species were greatly improved. The effect of pulsed electric field u3 (average voltage over the pulse period was 2.0 x 10(4) V, pulse frequency was 1 Hz, and pulse duration was 50 ms) was the greatest. The mean NAI concentration of C. kanran was the highest 1454967 ion · cm(-3), which was 48498.9 times as much as that in natural condition. The lowest one was S. truncata with the value of 34567 ion · cm(-3), which was 843.1 times as much as that in natural condition. The capacity of the same plants to generate negative air ion varied extremely under different intensity pulsed electric fields.

  1. 77 FR 31402 - Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 1 and 2...

    Science.gov (United States)

    2012-05-25

    ... Operating Company, Inc.; Vogtle Electric Generating Plant, Units 1 and 2; Application and Amendments to....regulations.gov as well as enter the comment submissions into ADAMS. The NRC does not routinely edit comment.... Your request should state that the NRC does not routinely edit comment submissions to remove such...

  2. Pump selection and application in a pressurized water reactor electric generating plant

    International Nuclear Information System (INIS)

    Kitch, D.M.

    1985-01-01

    Various pump applications utilized in a nuclear pressurized water reactor electric generating plant are described. Emphasis is on pumps installed in the auxiliary systems of the primary nuclear steam supply system. Hydraulic and mechanical details, the ASME Code (Nuclear Design), materials, mechanical seals, shaft design, seismic qualification, and testing are addressed

  3. Ocean thermal gradient as a generator of electricity. OTEC power plant

    Science.gov (United States)

    Enrique, Luna-Gomez Victor; Angel, Alatorre-Mendieta Miguel

    2016-04-01

    The OTEC (Ocean Thermal Energy Conversion) is a power plant that uses the thermal gradient of the sea water between the surface and a depth of about 700 meters. It works by supplying the heat to a steam machine, for evaporation, with sea water from the surface and cold, to condense the steam, with deep sea water. The energy generated by the power plant OTEC can be transferred to the electric power grid, another use is to desalinate seawater. During the twentieth century in some countries experimental power plants to produce electricity or obtaining drinking water they were installed. On the Mexico's coast itself this thermal gradient, as it is located in tropical seas it occurs, so it has possibilities of installing OTEC power plant type. In this paper one type OTEC power plant operation is represented in most of its components.

  4. Experimental Hydrogen Plant with Metal Hydrides to Store and Generate Electrical Power

    Science.gov (United States)

    Gonzatti, Frank; Nizolli, Vinícius; Ferrigolo, Fredi Zancan; Farret, Felix Alberto; de Mello, Marcos Augusto Silva

    2016-02-01

    Generation of electrical energy with renewable sources is interruptible due to the primary energy characteristics (sun, wind, hydro, etc.). In these cases, it is necessary to use energy storage so increasing penetrability of these sources connected to the distribution system. This paper discusses in details some equipment and accessories of an integrated power plant using fuel cell stack, electrolyzer and metal hydrides. During the plant operation were collected the power consumption data and established the efficiency of each plant component. These data demonstrated an overall efficiency of about 11% due to the low efficiencies of the commercial electrolyzers and power inverters used in the experiments.

  5. Air Emission Reduction Benefits of Biogas Electricity Generation at Municipal Wastewater Treatment Plants.

    Science.gov (United States)

    Gingerich, Daniel B; Mauter, Meagan S

    2018-02-06

    Conventional processes for municipal wastewater treatment facilities are energy and materially intensive. This work quantifies the air emission implications of energy consumption, chemical use, and direct pollutant release at municipal wastewater treatment facilities across the U.S. and assesses the potential to avoid these damages by generating electricity and heat from the combustion of biogas produced during anaerobic sludge digestion. We find that embedded and on-site air emissions from municipal wastewater treatment imposed human health, environmental, and climate (HEC) damages on the order of $1.63 billion USD in 2012, with 85% of these damages attributed to the estimated consumption of 19 500 GWh of electricity by treatment processes annually, or 0.53% of the US electricity demand. An additional 11.8 million tons of biogenic CO 2 are directly emitted by wastewater treatment and sludge digestion processes currently installed at plants. Retrofitting existing wastewater treatment facilities with anaerobic sludge digestion for biogas production and biogas-fueled heat and electricity generation has the potential to reduce HEC damages by up to 24.9% relative to baseline emissions. Retrofitting only large plants (>5 MGD), where biogas generation is more likely to be economically viable, would generate HEC benefits of $254 annually. These findings reinforce the importance of accounting for use-phase embedded air emissions and spatially resolved marginal damage estimates when designing sustainable infrastructure systems.

  6. VGB congress 'power plants 2003'. Generation gap - risk and challenge for the electricity market

    International Nuclear Information System (INIS)

    Anon.

    2003-01-01

    The VGB Congress 'Power Plants 2003' took place in Copenhagen from 15th to 17th September 2003. The motto of this year's Congress was 'Generation Gap - Risk and Challenge for the Electricity Market'. More than 800 participants took the opportunity for discussion and information in the plenary and technical lectures 'Market and Competition' and 'Technology, Operation and Environment'. Apart from the special features of the Scandinavian and Baltic electricity market, the main focus was on papers reflecting the situation of nuclear power (Finland), operating experience with new power plants, new materials for power plant construction, application of renewables and issues of climate protection. The Congress was again rounded off by technical visits and a side programme. (orig.) [de

  7. Costs of electric power generation in different types of power plants

    International Nuclear Information System (INIS)

    Weible, H.

    1977-01-01

    In the framework of our study 'energy - environment - industry' we need among other things the costs of electric power generation. We register their structure in a sub-model. Recently there was disagreement on effective costs of electric power generation particularly when comparing fossil-fuel power plants to nuclear power plants. For this reason, expertises on the costs of electric power generation in nuclear and fossil-fuel power plants were ordered with the Energy-Economic Institute in Cologne as well as with the Battelle Institute in Frankfurt. In the framwork of our paper on the system 'energy - environment - industry' we do not want to give new data potentially required for our task, before the expertises will be finished. Therefore the results given in part III of this lecture are only meant as an example in order to show possible consequences of the cost programs set up, depending on initial data whose general recognition is to be aimed at. Furthermore, the theoretical approach to investment calculation has to win general recognition when recording calculation methods computer-compatibly. Any new formulations discussed in industrial management have not been taken into account. (orig.) [de

  8. Validation of a methodology for the study of generation cost of electric power for nuclear power plants

    International Nuclear Information System (INIS)

    Ortega C, R.F.; Martin del Campo M, C.

    2004-01-01

    It was developed a model for the calculation of costs of electric generation of nuclear plants. The developed pattern was validated with the one used by the United States Council for Energy Awareness (USCEA) and the Electric Power Research Institute (EPRI), in studies of comparison of alternatives for electric generation of nuclear plants and fossil plants with base of gas and of coal in the United States described in the guides calls Technical Assessment Guides of EPRI. They are mentioned in qualitative form some changes in the technology of nucleo electric generation that could be included in the annual publication of Costs and Parameters of Reference for the Formulation of Projects of Investment in the Electric Sector of the Federal Commission of Electricity. These changes are in relation to the advances in the technology, in the licensing, in the construction and in the operation of the reactors called advanced as the A BWR built recently in Japan. (Author)

  9. Future CO2 emissions and electricity generation from proposed coal-fired power plants in India

    Science.gov (United States)

    Fofrich, R.; Shearer, C.; Davis, S. J.

    2017-12-01

    India represents a critical unknown in global projections of future CO2 emissions due to its growing population, industrializing economy, and large coal reserves. In this study, we assess existing and proposed construction of coal-fired power plants in India and evaluate their implications for future energy production and emissions in the country. In 2016, India had 369 coal-fired power plants under development totaling 243 gigawatts (GW) of generating capacity. These coal-fired power plants would increase India's coal-fired generating capacity by 123% and would exceed India's projected electricity demand. Therefore, India's current proposals for new coal-fired power plants would be forced to retire early or operate at very low capacity factors and/or would prevent India from meeting its goal of producing at least 40% of its power from renewable sources by 2030. In addition, future emissions from proposed coal-fired power plants would exceed India's climate commitment to reduce its 2005 emissions intensity 33% - 35% by 2030.

  10. Economic and environmental balancing in response to NEPA for electric power generating plants

    International Nuclear Information System (INIS)

    Bender, M.

    1976-01-01

    Discussion of principles that can provide guidance in responding to the National Environmental Policy Act (NEPA) in the planning of electric power generating plants. The environmental assessment procedure described is initiated by considering alternative decisions in concern for environmental assessment. Having defined the decision paths, the assessment proceeds in a four-phase sequence: Correlation of the alternatives with resource and marketing restraints; screening the alternatives for environmental adequacy and specifying the needed technological refinement; examination of the economics in terms of energy costs; comparing the energy cost with the environmental index and selecting the combination that best reflects the current social preference. (Auth.)

  11. Impact of Auxiliary Equipments Consumption on Electricity Generation Cost in Selected Power Plants of Pakistan

    Directory of Open Access Journals (Sweden)

    DILEEP KUMAR

    2017-04-01

    Full Text Available This study focuses on higher generation cost of electricity in selected TPPs (Thermal Power Plants in Sindh, Pakistan. It also investigates the energy consumed by the auxiliary equipment of the selected TPPs in Sindh, Pakistan. The AC (Auxiliary Consumption of selected TPPs is compared with that in UK and other developed countries. Results show that the AC in selected TPPs in Sindh, Pakistan exceeds the average AC of the TPPs situated in developed countries. Many energy conservation measures such as impeller trimming and de-staging, boiler feed pump, high voltage inverter, variable frequency drive, and upgrading the existing cooling tower fan blades with fiber reinforced plastic are discussed to overcome higher AC. This study shows that harnessing various available energy conservative measures the AC and unit cost can be reduced by 4.13 and 8.8%; also adverse environmental impacts can be mitigated. Results show that the unit cost of electricity can be reduced from Rs.20 to19/kWh in JTPP (Jamshoro Thermal Power Plant, Rs.9 to 8.8/kWh in GTPS (Gas Turbine Power Station Kotri and Rs. 11 to 10.27/ kWh in LPS (Lakhara Power Station. Thus, electricity production can be improved with the existing capacity, which will eventually assist to manage the current energy crisis and ensure its conservation

  12. Reactor type choice and characteristics for a small nuclear heat and electricity co-generation plant

    International Nuclear Information System (INIS)

    Liu Kukui; Li Manchang; Tang Chuanbao

    1997-01-01

    In China heat supply consumes more than 70 percent of the primary energy resource, which makes for heavy traffic and transportation and produces a lot of polluting materials such as NO x , SO x and CO 2 because of use of the fossil fuel. The utilization of nuclear power into the heat and electricity co-generation plant contributes to the global environmental protection. The basic concept of the nuclear system is an integral type reactor with three circuits. The primary circuit equipment is enclosed in and linked up directly with reactor vessel. The third circuit produces steam for heat and electricity supply. This paper presents basic requirements, reactor type choice, design characteristics, economy for a nuclear co-generation plant and its future application. The choice of the main parameters and the main technological process is the key problem of the nuclear plant design. To make this paper clearer, take for example a double-reactor plant of 450 x 2MW thermal power. There are two sorts of main technological processes. One is a water-water-steam process. Another is water-steam-steam process. Compared the two sorts, the design which adopted the water-water-steam technological process has much more advantage. The system is simplified, the operation reliability is increased, the primary pressure reduces a lot, the temperature difference between the secondary and the third circuits becomes larger, so the size and capacity of the main components will be smaller, the scale and the cost of the building will be cut down. In this design, the secondary circuit pressure is the highest among that of the three circuits. So the primary circuit radioactivity can not leak into the third circuit in case of accidents. (author)

  13. Future CO2 emissions and electricity generation from proposed coal-fired power plants in India

    Science.gov (United States)

    Shearer, Christine; Fofrich, Robert; Davis, Steven J.

    2017-04-01

    With its growing population, industrializing economy, and large coal reserves, India represents a critical unknown in global projections of future CO2 emissions. Here, we assess proposed construction of coal-fired power plants in India and evaluate their implications for future emissions and energy production in the country. As of mid-2016, 243 gigawatts (GW) of coal-fired generating capacity are under development in India, including 65 GW under construction and an additional 178 GW proposed. These under-development plants would increase the coal capacity of India's power sector by 123% and, when combined with the country's goal to produce at least 40% of its power from non-fossil sources by 2030, exceed the country's projected future electricity demand. The current proposals for new coal-fired plants could therefore either "strand" fossil energy assets (i.e., force them to retire early or else operate at very low capacity factors) and/or ensure that the goal is not met by "locking-out" new, low-carbon energy infrastructure. Similarly, future emissions from the proposed coal plants would also exceed the country's climate commitment to reduce its 2005 emissions intensity 33% to 35% by 2030, which—when combined with the commitments of all other countries—is itself not yet ambitious enough to meet the international goal of holding warming well below 2°C relative to the pre-industrial era.

  14. Generation and export of electric energy by sugar and alcohol plants; Geracao e exportacao de energia eletrica por usinas sucroalcooleiras

    Energy Technology Data Exchange (ETDEWEB)

    Queiroz, Gil Mesquita de Oliveira Rabello; Paschoareli Junior, Dionizio; Faria Junior, Max Jose de Araujo [Universidade Estadual Paulista (DEE/UNESP), Ilha Solteira, SP (Brazil). Dept. de Engenharia Eletrica. Grupo de Pesquisa em Fontes Alternativas e Aproveitamento de Energia Eletrica

    2008-07-01

    This paper presents technical aspects necessary to allow a sugar-cane mill, which promotes cogeneration, to operate as an electrical energy producer. Changes and optimization in the process to produce alcohol and sugar-cane, which results in the increase of electrical energy to export are discussed. A case of a sugarcane mill, working as a thermoelectric power plant is presented. The necessary components to generate energy and to connect the thermoelectric plant to the main transmission system are described. (author)

  15. Recovery Act: Brea California Combined Cycle Electric Generating Plant Fueled by Waste Landfill Gas

    Energy Technology Data Exchange (ETDEWEB)

    Galowitz, Stephen

    2012-12-31

    The primary objective of the Project was to maximize the productive use of the substantial quantities of waste landfill gas generated and collected at the Olinda Landfill near Brea, California. An extensive analysis was conducted and it was determined that utilization of the waste gas for power generation in a combustion turbine combined cycle facility was the highest and best use. The resulting Project reflected a cost effective balance of the following specific sub-objectives: • Meeting the environmental and regulatory requirements, particularly the compliance obligations imposed on the landfill to collect, process and destroy landfill gas • Utilizing proven and reliable technology and equipment • Maximizing electrical efficiency • Maximizing electric generating capacity, consistent with the anticipated quantities of landfill gas generated and collected at the Olinda Landfill • Maximizing equipment uptime • Minimizing water consumption • Minimizing post-combustion emissions • The Project produced and will produce a myriad of beneficial impacts. o The Project created 360 FTE construction and manufacturing jobs and 15 FTE permanent jobs associated with the operation and maintenance of the plant and equipment. o By combining state-of-the-art gas clean up systems with post combustion emissions control systems, the Project established new national standards for best available control technology (BACT). o The Project will annually produce 280,320 MWh’s of clean energy o By destroying the methane in the landfill gas, the Project will generate CO2 equivalent reductions of 164,938 tons annually. The completed facility produces 27.4 MWnet and operates 24 hours a day, seven days a week.

  16. Projections of cost and on-site manual-labor requirements for constructing electric-generating plants, 1980-1990

    International Nuclear Information System (INIS)

    1982-02-01

    This report represents part of a continuing effort by the Federal Government to forecast the capital and labor required for constructing electric generating capacity additions necessary to accommodate projected economic and population growth in the US and its regions. Information is included on anticipated additions to electric generating capacity, labor requirements for these additions, capital cost requirements, and forecasting models. Coal-fired, nuclear, hydro, and pumped storage power plants are considered in these forecasts

  17. Electric Power Plants and Generation Stations, File name = UTILITIES - PARTIAL Data is incomplete. Contains electric trans lines, electric substations, sewer plants, sewer pumpstations, water plants, water tanks http://www.harfordcountymd.gov/gis/Index.cfm, Published in 2011, 1:2400 (1in=200ft) scale, Harford County Government.

    Data.gov (United States)

    NSGIC Local Govt | GIS Inventory — Electric Power Plants and Generation Stations dataset current as of 2011. File name = UTILITIES - PARTIAL Data is incomplete. Contains electric trans lines, electric...

  18. Electricity generation costs of concentrated solar power technologies in China based on operational plants

    DEFF Research Database (Denmark)

    Zhu, Zhao; Zhang, Da; Mischke, Peggy

    2015-01-01

    Recent years witnessed a sharp increase of CSP (concentrated solar power) plants around the world. CSP is currently at its early stage in China, with several demonstration and utility-scale plants underway. China's rising electricity demand, the severe environmental pollution from coal-fired power...... CSP experts. On this basis, this study analyzes and benchmarks the costs of parabolic trough CSP, tower CSP, and dish CSP technologies in China by applying an LCOE (levelized cost of electricity) model. The current LCOE for the different CSP plants falls in a range of 1.2-2.7 RMB/kWh (0.19-0.43 US...

  19. Electricity generation by living plants in a plant microbial fuel cell

    NARCIS (Netherlands)

    Timmers, R.A.

    2012-01-01

    Society is facing local and global challenges to secure needs of people. One of those needs is the increasing demand of energy. Currently most energy is generated by conversion of fossil fuels. The major drawback of using fossil fuels is pollution of the environment by emission of carbon dioxide,

  20. Electricity generation by living plants in a plant microbial fuel cell

    NARCIS (Netherlands)

    Timmers, R.A.

    2012-01-01

    Society is facing local and global challenges to secure needs of people. One of those needs is the increasing demand of energy. Currently most energy is generated by conversion of fossil fuels. The major drawback of using fossil fuels is pollution of the environment by emission of carbon

  1. Biomass fired superheater for more efficient electricity generation from waste incineration plants. Final technical report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    A full scale Demonstration Plant has been constructed and tested at Haslev Combined Heat and Power Plant, which produces about 5 MW electric power and 13 MJ/s heat, enough to supply approximately 2500 households. The demonstration plant was commissioned in the spring of 1996. The results of testing are successful and show a capacity well above the design value. The concept is now developed to a commercial stage. The main component of the demonstration plant is a full scale carbonising plant of 3 MW. The plant is fired with straw, which is carbonised to 1 MJ/s product gas and 2 MJ/s char. Due to a low process temperature and absence of air, the corrosive matters remain in the char fraction, which is used as topping fuel in the steam boiler. The produced gas is utilised in a separate combustion chamber producing a flue gas with very low content of alkali metals, chlorides and particles, making the flue gas much less corrosive at high steam temperatures than flue gasses from direct combustion of municipal solid waste or straw. Therefore, the flue gas is used to boost steam data in an external superheater without increasing the corrosion speed. If the concept is used, when building new built plants, the electricity gain can be increased by typically 10-15% on a given heat demand, this is an improvement of approximately 3% points in electricity efficiency. (au)

  2. Solar Pilot Plant, Phase I. Preliminary design report. Volume VI. Electrical power generation; master control subsystems; balance of plant CDRL item 2

    Energy Technology Data Exchange (ETDEWEB)

    None

    1977-05-01

    The Honeywell electrical power generation subsystem centers on a General Electric dual admission, triple extraction turbine generator sized to the output requirements of the Pilot Plant. The turbine receives steam from the receiver subsystem and/or the thermal storage subsystem and supplies those subsystems with feedwater. The turbine condensor is wet cooled. The plant control system consists of a coordinated digital master and subsystem digital/analog controls. The remainder of the plant, work spaces, maintenance areas, roads, and reception area are laid out to provide maximum convenience compatible with utility and safety. Most of the activities are housed in a complex around the base of the receiver tower. This volume contains a description of the relationship of the electrical power generation subsystem to the rest of the plant, the design methodology and evolution, the interface integration and control, and the operation and maintenance procedures.

  3. 76 FR 388 - Southern Nuclear Operating Company; Vogtle Electric Generating Plant, Unit Nos. 1 and 2; Notice...

    Science.gov (United States)

    2011-01-04

    ... Operating Company; Vogtle Electric Generating Plant, Unit Nos. 1 and 2; Notice of Consideration of Issuance... Web site http://www.regulations.gov . Because your comments will not be edited to remove any... will not edit their comments to remove any identifying or contact information, and therefore, they...

  4. 76 FR 30206 - Southern Nuclear Operating Company, Inc., Vogtle Electric Generating Plant, Unit 1 and 2; Notice...

    Science.gov (United States)

    2011-05-24

    ... Operating Company, Inc., Vogtle Electric Generating Plant, Unit 1 and 2; Notice of Consideration of Issuance..., http://www.regulations.gov . Because your comments will not be edited to remove any identifying or... received from other persons for submission to the NRC inform those persons that the NRC will not edit their...

  5. The PBMR electric power generation plant; La planta de generacion de energia electrica PBMR

    Energy Technology Data Exchange (ETDEWEB)

    Perez S, G.; Santacruz I, I.; Martin del Campo M, C. [FI-UNAM, 04500 Mexico D.F. (Mexico)] e-mail: gabriela_perez@engineer.com

    2003-07-01

    This work has as purpose to diffuse in a general way the technology of the one modulate reactor of pebble bed. Because our country is in developing ways, the electric power demand goes in increase with that which it is presented the great challenge of satisfying this necessity, not only being in charge of the one fact per se, but also involving the environmental aspect and of security. Both factors are covered by the PBMR technology, which we approach in their basic aspects with the purpose that the public opinion knows it and was familiarized with this type of reactors that well could represent a solution for our growing electricity demand. We will treat this reactor visualizing it like part of a generation plant defining in first place to the itself reactor. We will see because that the system PBMR consists of 2 main sections: the reactor and the unit of energy conversion, highlighting that the principle of the PBMR reactor operation is based on the thermodynamic Brayton cycle cooled by helium and that, in turn, it transmits the energy in form of heat toward a gas turbine. In what concerns to the fuel, it peculiar design due to its spherical geometry is described, aspect that make to this reactor different from the traditional ones that use fuel rods. In fact in the fuel spheres of the PBMR it is where it resides great part of it inherent security since each particle of fuel, consistent in uranium dioxide, is lined one with coal and silicon carbide those which form an impenetrable barrier containing to the fuel and those radioactive products that result of the nuclear reactions. Such particles are encapsulated in graphite to form the sphere or 'pebble', of here born the name of this innovative technology. (Author)

  6. Design of reactor protection systems for HTR plants generating electric power and process heat problems and solutions

    International Nuclear Information System (INIS)

    Craemer, B.; Dahm, H.; Spillekothen, H.G.

    1982-06-01

    The design basis of the reactor protection system (RPS) for HTR plants generating process heat and electric power is briefly described and some particularities of process heat plants are indicated. Some particularly important or exacting technical measuring positions for the RPS of a process heat HTR with 500 MWsub(th) power (PNP 500) are described and current R + D work explained. It is demonstrated that a particularly simple RPS can be realized in an HTR with modular design. (author)

  7. Estimation of requirements of eolic energy equivalent to the electric generation of the Laguna Verde nuclear power plant

    International Nuclear Information System (INIS)

    Garcia V, M.A.; Hernandez M, I.A.; Martin del Campo M, C.

    2004-01-01

    The advantages are presented that have the nuclear and eolic energy as for their low environmental impact and to the human health. An exercise is presented in the one that is supposed that the electric power generated by the Laguna Verde Nuclear Power plant (CNLV), with capacity of 1365 M W, it should be produced by eolic energy when in the years 2020 and 2025 the units 1 and 2 of the CNLV reach its useful life and be moved away. It is calculated the number of aero generators that would produce the electric power average yearly of the CNLV, that which is equal to install eolic parks with capacity of 2758 M W, without considering that it will also be invested in systems of back generation to produce electricity when the aero generators stops for lack of wind. (Author)

  8. Carbon Capture and Water Emissions Treatment System (CCWESTRS) at Fossil-Fueled Electric Generating Plants

    Energy Technology Data Exchange (ETDEWEB)

    P. Alan Mays; Bert R. Bock; Gregory A. Brodie; L. Suzanne Fisher; J. Devereux Joslin; Donald L. Kachelman; Jimmy J. Maddox; N. S. Nicholas; Larry E. Shelton; Nick Taylor; Mark H. Wolfe; Dennis H. Yankee; John Goodrich-Mahoney

    2005-08-30

    The Tennessee Valley Authority (TVA), the Electric Power Research Institute (EPRI), and the Department of Energy-National Energy Technologies Laboratory (DOE-NETL) are evaluating and demonstrating integration of terrestrial carbon sequestration techniques at a coal-fired electric power plant through the use of Flue Gas Desulfurization (FGD) system gypsum as a soil amendment and mulch, and coal fly ash pond process water for periodic irrigation. From January to March 2002, the Project Team initiated the construction of a 40 ha Carbon Capture and Water Emissions Treatment System (CCWESTRS) near TVA's Paradise Fossil Plant on marginally reclaimed surface coal mine lands in Kentucky. The CCWESTRS is growing commercial grade trees and cover crops and is expected to sequester 1.5-2.0 MT/ha carbon per year over a 20-year period. The concept could be used to meet a portion of the timber industry's needs while simultaneously sequestering carbon in lands which would otherwise remain non-productive. The CCWESTRS includes a constructed wetland to enhance the ability to sequester carbon and to remove any nutrients and metals present in the coal fly ash process water runoff. The CCWESTRS project is a cooperative effort between TVA, EPRI, and DOE-NETL, with a total budget of $1,574,000. The proposed demonstration project began in October 2000 and has continued through December 2005. Additional funding is being sought in order to extend the project. The primary goal of the project is to determine if integrating power plant processes with carbon sequestration techniques will enhance carbon sequestration cost-effectively. This goal is consistent with DOE objectives to provide economically competitive and environmentally safe options to offset projected growth in U.S. baseline emissions of greenhouse gases after 2010, achieve the long-term goal of $10/ton of avoided net costs for carbon sequestration, and provide half of the required reductions in global greenhouse gases by

  9. Multipurpose plant for simultaneous electricity and drinking water generation on the basis of nuclear fuel

    International Nuclear Information System (INIS)

    Kuenstle, K.

    1978-01-01

    After listing the available technologies for sea water desalination, the author discusses a) the problem of multi-stage distillation, b) the coupling of a thermal power plant and a sea water distillation plant and c) the dual-purpose plant with nuclear steam generation. He points out that the radiological considerations and regulations can be applied without modification to a nuclear interconnected system. The additional pathway for theoretical activity release is under sufficient control. Also discussed are the circuiting of the IRAN I and II plants, optimisation problems in dual-purpose plants, and chemically self-sufficient plants for simultaneous production of drinking water and raw materials from sea water. (GG) [de

  10. Solar thermal electricity generation

    Science.gov (United States)

    Gasemagha, Khairy Ramadan

    1993-01-01

    This report presents the results of modeling the thermal performance and economic feasibility of large (utility scale) and small solar thermal power plants for electricity generation. A number of solar concepts for power systems applications have been investigated. Each concept has been analyzed over a range of plant power ratings from 1 MW(sub e) to 300 MW(sub e) and over a range of capacity factors from a no-storage case (capacity factor of about 0.25 to 0.30) up to intermediate load capacity factors in the range of 0.46 to 0.60. The solar plant's economic viability is investigated by examining the effect of various parameters on the plant costs (both capital and O & M) and the levelized energy costs (LEC). The cost components are reported in six categories: collectors, energy transport, energy storage, energy conversion, balance of plant, and indirect/contingency costs. Concentrator and receiver costs are included in the collector category. Thermal and electric energy transport costs are included in the energy transport category. Costs for the thermal or electric storage are included in the energy storage category; energy conversion costs are included in the energy conversion category. The balance of plant cost category comprises the structures, land, service facilities, power conditioning, instrumentation and controls, and spare part costs. The indirect/contingency category consists of the indirect construction and the contingency costs. The concepts included in the study are (1) molten salt cavity central receiver with salt storage (PFCR/R-C-Salt); (2) molten salt external central receiver with salt storage (PFCR/R-E-Salt); (3) sodium external central receiver with sodium storage (PFCR/RE-Na); (4) sodium external central receiver with salt storage (PFCR/R-E-Na/Salt); (5) water/steam external central receiver with oil/rock storage (PFCR/R-E-W/S); (6) parabolic dish with stirling engine conversion and lead acid battery storage (PFDR/SLAB); (7) parabolic dish

  11. Model Thermoelectric Generator TEG Small Modular As Micro Electricity Plant At Indonesia Part 1 Design And Material

    Directory of Open Access Journals (Sweden)

    Kisman M. Mahmud

    2015-08-01

    Full Text Available Thermoelectrically Generator TEG can generate electricity from the temperature difference between hot and cold at the junction thermoelectric module with two different semiconductor materials there will be a flow of current through the junction so as to produce a voltage. This principle uses the Seebeck effect thermoelectric generator as a base. By using these principles this study was conducted to determine the potential of the electric energy of the two Peltier modules which would be an alternative source for micro electricity plant using heat from methylated. The focus of this research is to design a model TEG Thermoelectric Generator Small Modular to produce the kind of material that is optimum for a TEG on the simulation Computer Aided Design CAD with a variety of four different materials that Bi2Te3 Bismuth Telluride PbTe-BiTe CMO-32 -62S Cascade and CMO-32-62S Calcium Manganese Oxide to its cold side using the heat sink fan and simulating heat aluminum plate attached to the hot side of the TEG modules with heat source of methylated. Model simulation results on TEG Small Modular micro electrical plant material obtained CMO-32-62S Cascade thermal material that has a value greater than 3 other material.

  12. Scenarios for the hierarchical evaluation of the global sustainability of electric generator plants

    International Nuclear Information System (INIS)

    Roldan A, M.C.; Martinez F, M.

    2007-01-01

    The AHP multi criteria method was applied (Analytic Hierarchy Process-Analytic process of Hierarchization) to evaluate the sustainability in the whole life cycle of the electricity generation technologies (hydroelectric, carboelectric, thermoelectric natural fuel oil, natural gas thermoelectric, geothermal, nucleo electric, wind electric, photo thermic and photovoltaic) with the purpose of offering an useful method in the taking of decisions to impel the sustainable development. Eight scenarios are analyzed. The results in most of the scenarios reflect the benefit of the renewable energy: the hydroelectric energy, photo thermic and wind driven its are those more sustainable. To reach the sustainable development in Mexico, the energy politicians should be more near to the use of the renewable energy. (Author)

  13. The history and development of off-site nuclear power plant training in the Central Electricity Generating Board

    International Nuclear Information System (INIS)

    Madden, V.J.; Bindon, F.J.L.

    1987-01-01

    The paper describes the history and development of off-site nuclear power plant training in the Central Electricity Generating Board (United Kingdom). A description is given of: the training at Calder Hall, -circa 1958, early simulator training at Berkeley Power Station, Oldbury Nuclear Power Training Centre, Heysham 2, and PWR training. The paper also looks at future developments likely to occur in the next few years. (UK)

  14. Electricity generation of Plant Microbial Fuel Cell (PMFC using Cyperus Involucratus R.

    Directory of Open Access Journals (Sweden)

    Nuttawut Klaisongkram

    2015-03-01

    Full Text Available This research is a study of microbial fuel cells produce electricity from plants using Cyperus involucratus R. called Plant Microbial Fuel Cell (PMFC. As a result of the polarization curve, by adjusting the external resistance between 10 to 12,000 ohms, it was found that the internal resistance of PMFC1 , PMFC2 , MFC1 and MFC2 was 9.78, 11.06, 9.47 and 11.92 ohms respectively. The results showed that the optimum size of the anode electrode is 242 square centimeters and adding soil by using the external resistance 100 ohms. The highest average power density equaled to 5.99 milliwatts per square meter of the anode electrode. Finally the wastewater in PMFC was reduced 53.5 percent in the period of 5 days compared with un-treated wastewater.

  15. Resolution 148/012. It authorize the 'Central Libertador / SA aeolian generation' company to generate an aeolian electricity source by an electric power generating plant located in Lavalleja town 1 AA catastral section and in Maldonado town 4 AA Catastral section, and the 'Sistema inerconectado Nacional' connection

    International Nuclear Information System (INIS)

    2012-01-01

    This decree authorizes the generation of electricity using aeolian energy as the primary electricity source. This project was presented by the 'Libertador / S.A' aeolian generation company with the proposal to instal an electrical plant in Lavalleja town. This authorization is according to the Electric Wholesale Market regulation

  16. Modeling generator power plant portfolios and pollution taxes in electric power supply chain networks: a transportation network equilibrium transformation

    International Nuclear Information System (INIS)

    Kai Wu; Nagurney, A.; University of Massachusetts, Amherst, MA; Zugang Liu; Stranlund, J.K.

    2006-01-01

    Global climate change and fuel security risks have encouraged international and regional adoption of pollution/carbon taxes. A major portion of such policy interventions is directed at the electric power industry with taxes applied according to the type of fuel used by the power generators in their power plants. This paper proposes an electric power supply chain network model that captures the behavior of power generators faced with a portfolio of power plant options and subject to pollution taxes. We demonstrate that this general model can be reformulated as a transportation network equilibrium model with elastic demands and qualitatively analyzed and solved as such. The connections between these two different modeling schemas is done through finite-dimensional variational inequality theory. The numerical examples illustrate how changes in the pollution/carbon taxes affect the equilibrium electric power supply chain network production outputs, the transactions between the various decision-makers the demand market prices, as well as the total amount of carbon emissions generated. (author)

  17. Electric Power Plants and Generation Stations, Power Plants - is a seperate layer, however, we have them included in local building layer as well, Published in 2010, 1:2400 (1in=200ft) scale, Effingham County Government.

    Data.gov (United States)

    NSGIC Local Govt | GIS Inventory — Electric Power Plants and Generation Stations dataset current as of 2010. Power Plants - is a seperate layer, however, we have them included in local building layer...

  18. Electricity Generation Company: Annual Report 2005

    International Nuclear Information System (INIS)

    2006-01-01

    A brief account of the generating electrical energy and building the most suitable generation facility activities carried out by the Electricity Generation Company, Ankara during the period January 2005 to December 2005 is presented. These activities are reported under the headings: 1)Primary resources for electricity generation, 2) 2004 results, 3) Investments, 4) Important project, 5) Installed capacity, 6) Generation, 7) Thermal power plants, 8) Environmental activities, 9) Training activities 10) Balance sheet for the year 2005 11) Subsidiaries 12) Participations etc

  19. Electricity Generation Company: Annual Report 2004

    International Nuclear Information System (INIS)

    2006-01-01

    A brief account of the generating electrical energy and building the most suitable generation facility activities carried out by the Electricity Generation Company, Ankara during the period January 2004 to December 2004 is presented. These activities are reported under the headings: 1)Primary resources for electricity generation, 2) 2004 results, 3) Investments, 4) Important project, 5) Installed capacity, 6) Generation, 7) Thermal power plants, 8) Environmental activities, 9) Training activities 10) Affiliated partnerships and participations etc

  20. Energy intensities, EROIs (energy returned on invested), and energy payback times of electricity generating power plants

    International Nuclear Information System (INIS)

    Weißbach, D.; Ruprecht, G.; Huke, A.; Czerski, K.; Gottlieb, S.; Hussein, A.

    2013-01-01

    The energy returned on invested, EROI, has been evaluated for typical power plants representing wind energy, photovoltaics, solar thermal, hydro, natural gas, biogas, coal and nuclear power. The strict exergy concept with no “primary energy weighting”, updated material databases, and updated technical procedures make it possible to directly compare the overall efficiency of those power plants on a uniform mathematical and physical basis. Pump storage systems, needed for solar and wind energy, have been included in the EROI so that the efficiency can be compared with an “unbuffered” scenario. The results show that nuclear, hydro, coal, and natural gas power systems (in this order) are one order of magnitude more effective than photovoltaics and wind power. - Highlights: ► Nuclear, “renewable” and fossil energy are comparable on a uniform physical basis. ► Energy storage is considered for the calculation, reducing the ERoEI remarkably. ► All power systems generate more energy than they consume. ► Photovoltaics, biomass and wind (buffered) are below the economical threshold

  1. Electric power generation

    International Nuclear Information System (INIS)

    Pinske, J.D.

    1981-01-01

    Apart from discussing some principles of power industry the present text deals with the different ways of electric power generation. Both the conventional methods of energy conversion in heating and water power stations and the facilities for utilizing regenerative energy sources (sun, wind, ground heat, tidal power) are considered. The script represents the essentials of the lecture of the same name which is offered to the students of the special subject 'electric power engineering' at the Fachhochschule Hamburg. It does not require any special preliminary knowledge except for the general principles of electrical engineering. It is addressing students of electrical engineering who have passed their preliminary examination at technical colleges and universities. Moreover, it shall also be of use for engineers who want to obtain a quick survey of the structure and the operating characteristics of the extremely different technical methods of power generation. (orig.) [de

  2. Solar Thermal Electricity Generating System

    Science.gov (United States)

    Mishra, Sambeet; Tripathy, Pratyasha

    2012-08-01

    A Solar Thermal Electricity generating system also known as Solar Thermal Power plant is an emerging renewable energy technology, where we generate the thermal energy by concentrating and converting the direct solar radiationat medium/high temperature (300∫C ñ 800∫C). The resulting thermal energy is then used in a thermodynamic cycleto produce electricity, by running a heat engine, which turns a generator to make electricity. Solar thermal power is currently paving the way for the most cost-effective solar technology on a large scale and is heading to establish a cleaner, pollution free and secured future. Photovoltaic (PV) and solar thermal technologies are two main ways of generating energy from the sun, which is considered the inexhaustible source of energy. PV converts sunlight directly into electricity whereas in Solar thermal technology, heat from the sun's rays is concentrated to heat a fluid, whose steam powers a generator that produces electricity. It is similar to the way fossil fuel-burning power plants work except that the steam is produced by the collected heat rather than from the combustion of fossil fuels. In order to generate electricity, five major varieties of solar thermal technologies used are:* Parabolic Trough Solar Electric Generating System (SEGS).* Central Receiver Power Plant.* Solar Chimney Power Plant.* Dish Sterling System.* Solar Pond Power Plant.Most parts of India,Asia experiences a clear sunny weather for about 250 to 300 days a year, because of its location in the equatorial sun belt of the earth, receiving fairly large amount of radiation as compared to many parts of the world especially Japan, Europe and the US where development and deployment of solar technologies is maximum.Whether accompanied with this benefit or not, usually we have to concentrate the solar radiation in order to compensate for the attenuation of solar radiation in its way to earthís surface, which results in from 63,2 GW/m2 at the Sun to 1 kW/m2 at

  3. Electricity generation in Germany under the conditions of climate policy and liberalized electricity market. Valuation of power plant investments with Bayesian influence diagrams

    International Nuclear Information System (INIS)

    Oetsch, Rainald

    2012-03-01

    Power plant investors face large uncertainties due to ongoing liberalization, climate policy, and long investment horizons. This study provides a probabilistic appraisal of power plant investments within the framework of Bayesian decision theory. A Bayesian influence diagram is used for setting up a discounted cash flow model and analysing the profitability of power plants. As the study explicitly models merit order pricing, the pass-through of random fuel and carbon costs may be analysed. The study derives probabilistic statements about net present values of single investments and company portfolios and explores the sensitivity of profits to variations of select input variables. In the majority of cases, an increase in the price of emission allowances also increases the net present value of existing power plant portfolios. A substantially increased carbon prices also is the prerequisite to diversify power plant portfolios by gas and CCS plants. For the currently prevailing German electricity market, we argue that investors may lack incentives for new investments in fossil generation, a finding that holds true also with implementation of CCS. Our estimates are conservative, as profitability will further deteriorate with the build-up of renewables.

  4. Wind electric power generation

    International Nuclear Information System (INIS)

    Koch, M.K.; Wind, L.; Canter, B.; Moeller, T.

    2001-01-01

    The monthly statistics of wind electric power generation in Denmark are compiled from information given by the owners of the private wind turbines. For each wind turbine the name of the site and of the type of turbine is given, and the power generation data are given for the month in question together with the total production in 1999 and 2000. Also the data of operation start are given. On the map of Denmark the sites of the wind turbines are marked. (CLS)

  5. Maintenance Tools applied to Electric Generators to Improve Energy Efficiency and Power Quality of Thermoelectric Power Plants

    Directory of Open Access Journals (Sweden)

    Milton Fonseca Junior

    2017-07-01

    Full Text Available This paper presents a specific method to improve the reliability of the equipment and the quality of power supplied to the electrical systems with the frequency and voltage control of a thermoelectric plant, to guarantee a more stable system. The method has the novelty of combining Total Productive Maintenance (TPM using only four pillars, with Electrical Predictive Maintenance based in failure analysis and diagnostic. It prevents voltage drops caused by excessive reactive consumption, thus guaranteeing the company a perfect functioning of its equipment and providing a longer life of them. The Maintenance Management Program (MMP seeks to prevent failures from causing the equipment to be shut down from the electrical system, which means large financial losses, either by reducing billing or by paying fines to the regulatory agency, in addition to prejudice the reliability of the system. Using management tools, but applying only four TPM pillars, it was possible to achieve innovation in power plants with internal combustion engines. This study aims to provide maintenance with a more reliable process, through the implantation of measurement, control and diagnostic devices, thus allowing the management to reduce breakdown of plant equipment. Some results have been achieved after the implementation, such as reduction of annual maintenance cost, reduction of corrective maintenance, increase of MTBF (Mean Time between Failures and reduction of MTTR (Mean Time to Repair in all areas. Probabilistic models able to describe real processes in a more realistic way, and facilitate the optimization at maximum reliability or minimum costs are presented. Such results are reflected in more reliable and continual power generation.

  6. Epipremnum aureum and Dracaena braunii as indoor plants for enhanced bio-electricity generation in a plant microbial fuel cell with electrochemically modified carbon fiber brush anode.

    Science.gov (United States)

    Sarma, Pranab Jyoti; Mohanty, Kaustubha

    2018-04-13

    In this study, two different unexploited indoor plants, Epipremnum aureum and Dracaena braunii were used to produce clean and sustainable bio-electricity in a plant microbial fuel cell (PMFC). Acid modified carbon fiber brush electrodes as well as bare electrodes were used in both the PMFCs. A bentonite based clay membrane was successfully integrated in the PMFCs. Maximum performance of E. aureum was 620 mV which was 188 mV higher potential than D. braunii. The bio-electricity generation using modified electrode was 154 mV higher than the bare carbon fiber, probably due to the effective bacterial attachment to the carbon fiber owing to hydrogen bonding. Maximum power output of 15.38 mW/m 2 was obtained by E. aureum with an internal resistance of 200 Ω. Higher biomass yield was also obtained in case of E. aureum during 60 days of experiment, which may correlate with the higher bio-electricity generation than D. braunii. Copyright © 2018 The Society for Biotechnology, Japan. Published by Elsevier B.V. All rights reserved.

  7. Electricity generation by a plant microbial fuel cell with an integrated oxygen reducing biocathode

    NARCIS (Netherlands)

    Wetser, K.; Sudirjo, E.; Buisman, C.J.N.; Strik, D.P.B.T.B.

    2015-01-01

    In this study we show that a chemical ferricyanide cathode can be replaced by a biological oxygen reducing cathode in a plant microbial fuel cell (PMFC) with a new record power output. A biocathode was successfully integrated in a PMFC and operated for 151 days. Plants growth continued and the power

  8. Insights into the applicability of microbial fuel cells in wastewater treatment plants for a sustainable generation of electricity.

    Science.gov (United States)

    Krieg, Thomas; Mayer, Florian; Sell, Dieter; Holtmann, Dirk

    2017-11-21

    Microbial fuel cells (MFCs) are often discussed as a part of a sustainable generation of electricity for the coming 'energy revolution'. In particular, the application of MFCs in wastewater treatment plants (WWTPs) are often regarded as an attractive alternative to reduce costs while generating electricity. Field surveys are necessary to show the applicability of MFCs in WWTPs considering daily fluctuations and environmental effects such as rain events affecting the MFC performance remarkably. In this study, a MFC system was tested in four municipal WWTPs using different modes of operation. A correlation between current densities and sludge loading (SL) was identified. At low SLs, the activated sludge needs a large amount of the energy derived from the substrate for the maintenance metabolism resulting in quite low current densities of the MFC. At high SLs much more of the energy can be transferred from the activated sludge to the electrode, resulting in higher currents. Furthermore, the effect of environmental conditions on the current densities was evaluated. WWTPs have daily fluctuations depending on the wastewater composition, weather phenomena and population equivalents. Our data show that these daily fluctuations can only be observed in the MFC performance at WWTPs below 50,000 population equivalents.

  9. Employment benefits of electricity generation: A comparative assessment of lignite and natural gas power plants in Greece

    International Nuclear Information System (INIS)

    Tourkolias, C.; Mirasgedis, S.; Damigos, D.; Diakoulaki, D.

    2009-01-01

    This paper aims at developing an integrated approach for estimating the employment benefits associated with power-generation technologies. The proposed approach exploits the input-output methodology for estimating the direct, indirect and induced employment effects associated with the energy project in question, as well as two different valuation techniques, namely the 'opportunity cost of labour' approach and the 'public expenditures' approach, for expressing these effects in monetary terms. This framework has been implemented to estimate the employment benefits resulting from the development of a lignite-fired and a natural gas-fired power plant in Greece, taking into account all the stages of the corresponding fuel cycles that are undertaken domestically. The results of the analysis clearly show that lignite-fired electricity generation results in significant employment benefits amounting to 2.9-3.5 Euro /MWh in the basic scenario. On the other hand, the employment benefits associated with the examined natural gas unit were estimated at 0.4-0.6 Euro /MWh in the basic scenario. It is also worth mentioning that the significant environmental externalities of the lignite-fired electricity in Greece that have been presented in a number of studies can only be partially compensated by the estimated employment benefits.

  10. Comparison and assessment of electricity generation capacity for different types of PV solar plants of 1MW in Soko banja, Serbia

    Directory of Open Access Journals (Sweden)

    Pavlović Tomislav M.

    2011-01-01

    Full Text Available This paper gives the results of the electricity generated by the fixed, one-axis and dual-axis tracking PV solar plant of 1 MW with flat PV panels made of monocrystalline silicon which is to be built in the area of Soko banja (spa in Serbia. Further on follows a description of the functioning of the fixed and one-axis and dual-axis tracking PV solar plant. For the calculation of the electricity generated by these plants PVGIS program from the Internet was used. Calculations have shown that fixed PV solar plant power of 1 MW, solar modules of monocrystalline silicon yield 1130000 kWh power output, one-axis tracking PV solar plant yields 1420000 kWh, and dual-axis tracking PV solar plant yields 1450000 kWh of electricity. Electricity generated by the fixed PV solar plant could satisfy 86% of the annual needs for the electricity of the „Zdravljak“ hotel and the special „Novi stacionar“ hospital in Soko banja.

  11. Solar thermal power plants for heat and electricity generation; Presentacion de plantas termosolares para generacion de calor y energia electrica

    Energy Technology Data Exchange (ETDEWEB)

    Estrada Cajigal, V. [Solartronic S. A. de C. V., Cuernavaca (Mexico); Manzini, F.; Sanchez, A. [Laboratorio de Energia Solar (IIM-UNAM), Temixco (Mexico)

    1992-12-31

    Solar thermal technology is presented for concentration into a point for the production of heat and energy in small and large scale, emphasis is made on the capacity for the combination with current technologies using fossil fuels for electricity generation and process steam, increasing the global efficiency of the power plants and notably reducing the pollutants emission to the air during the insolation hours. It is successfully compared with other solar-thermal technologies. [Espanol] Se presenta la tecnologia termosolar de concentracion puntual para produccion de calor y de energia en pequena y gran escala, se enfatiza su capacidad de combinacion con las tecnologias actuales que utilizan combustibles fosiles para produccion de electricidad y vapor de proceso, aumentando la eficiencia global de las plantas y reduciendo notablemente sus emisiones contaminantes a la atmosfera durante las horas de insolacion. Se le compara exitosamente con otras tecnologias termosolares.

  12. 78 FR 38411 - Vogtle Electric Generating Plant, Unit 4; Inspections, Tests, Analyses, and Acceptance Criteria

    Science.gov (United States)

    2013-06-26

    ... Plant, Unit 4; Inspections, Tests, Analyses, and Acceptance Criteria AGENCY: Nuclear Regulatory Commission. ACTION: Determination of inspections, tests, analyses, and acceptance criteria completion. SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) staff has determined that the inspections, tests...

  13. Wind power. [electricity generation

    Science.gov (United States)

    Savino, J. M.

    1975-01-01

    A historical background on windmill use, the nature of wind, wind conversion system technology and requirements, the economics of wind power and comparisons with alternative systems, data needs, technology development needs, and an implementation plan for wind energy are presented. Considerable progress took place during the 1950's. Most of the modern windmills feature a wind turbine electricity generator located directly at the top of their rotor towers.

  14. Electric power generator

    International Nuclear Information System (INIS)

    Carney, H.C.

    1977-01-01

    An electric power generator of the type employing a nuclear heat source and a thermoelectric converter is described wherein a transparent thermal insulating medium is provided inside an encapsulating enclosure to thermally insulate the heat source and thermoelectric generator. The heat source, the thermoelectric converter, and the enclosure are provided with facing surfaces which are heat-reflective to a substantial degree to inhibit radiation of heat through the medium of the encapsulating enclosure. Multiple reflective foils may be spaced within the medium as necessary to inhibit natural convection of heat and/or further inhibit radiation

  15. Electricity Generation Baseline Report

    Energy Technology Data Exchange (ETDEWEB)

    Logan, Jeffrey [National Renewable Energy Lab. (NREL), Golden, CO (United States); Marcy, Cara [National Renewable Energy Lab. (NREL), Golden, CO (United States); McCall, James [National Renewable Energy Lab. (NREL), Golden, CO (United States); Flores-Espino, Francisco [National Renewable Energy Lab. (NREL), Golden, CO (United States); Bloom, Aaron [National Renewable Energy Lab. (NREL), Golden, CO (United States); Aabakken, Jorn [National Renewable Energy Lab. (NREL), Golden, CO (United States); Cole, Wesley [National Renewable Energy Lab. (NREL), Golden, CO (United States); Jenkin, Thomas [National Renewable Energy Lab. (NREL), Golden, CO (United States); Porro, Gian [National Renewable Energy Lab. (NREL), Golden, CO (United States); Liu, Chang [National Renewable Energy Lab. (NREL), Golden, CO (United States); Ganda, Francesco [Argonne National Lab. (ANL), Argonne, IL (United States); Boardman, Richard [Idaho National Lab. (INL), Idaho Falls, ID (United States); Tarka, Thomas [National Energy Technology Lab. (NETL), Albany, OR (United States); Brewer, John [National Energy Technology Lab. (NETL), Albany, OR (United States); Schultz, Travis [National Energy Technology Lab. (NETL), Albany, OR (United States)

    2017-01-01

    This report was developed by a team of national laboratory analysts over the period October 2015 to May 2016 and is part of a series of studies that provide background material to inform development of the second installment of the Quadrennial Energy Review (QER 1.2). The report focuses specifically on U.S. power sector generation. The report limits itself to the generation sector and does not address in detail parallel issues in electricity end use, transmission and distribution, markets and policy design, and other important segments. The report lists 15 key findings about energy system needs of the future.

  16. The role of advanced nuclear plants in reducing the environmental and economic impact of greenhouse emissions on electrical generation

    International Nuclear Information System (INIS)

    Redding, J.; Veitch, C.

    1995-01-01

    The paper discusses the potential impact of imposing economic penalties (externalities) in an effort to reduce emission levels and environmental effect of existing and newly constructed electric facilities, on the selection of generation technology and fuel type, and how the nuclear industry's efforts to develop the next generation of nuclear power facilities will provide an economic, low emission generating option to meet the expanding global electrical needs. The efforts of the US nuclear industry to improve the performance and economics of the existing and next generation facilities are presented, focusing on General Electric's Advanced Boiling Water Reactor and Simplified Boiling Water Reactor. 5 refs., 4 figs., 2 tabs

  17. Electricity generation by a novel design tubular plant microbial fuel cell

    NARCIS (Netherlands)

    Timmers, R.A.; Strik, D.P.B.T.B.; Hamelers, H.V.M.; Buisman, C.J.N.

    2013-01-01

    The tubular plant microbial fuel cell was designed to increase the feasibility of this technology. To test the new setup two anode materials were investigated, namely a graphite felt and graphite granules. The average power output based on membrane area was 10 mW m-2 for felt, and 12 mW m-2 for

  18. Geothermal Power Generation Plant

    Energy Technology Data Exchange (ETDEWEB)

    Boyd, Tonya [Oregon Inst. of Technology, Klamath Falls, OR (United States). Geo-Heat Center

    2013-12-01

    Oregon Institute of Technology (OIT) drilled a deep geothermal well on campus (to 5,300 feet deep) which produced 196°F resource as part of the 2008 OIT Congressionally Directed Project. OIT will construct a geothermal power plant (estimated at 1.75 MWe gross output). The plant would provide 50 to 75 percent of the electricity demand on campus. Technical support for construction and operations will be provided by OIT’s Geo-Heat Center. The power plant will be housed adjacent to the existing heat exchange building on the south east corner of campus near the existing geothermal production wells used for heating campus. Cooling water will be supplied from the nearby cold water wells to a cooling tower or air cooling may be used, depending upon the type of plant selected. Using the flow obtained from the deep well, not only can energy be generated from the power plant, but the “waste” water will also be used to supplement space heating on campus. A pipeline will be construction from the well to the heat exchanger building, and then a discharge line will be construction around the east and north side of campus for anticipated use of the “waste” water by facilities in an adjacent sustainable energy park. An injection well will need to be drilled to handle the flow, as the campus existing injection wells are limited in capacity.

  19. Technology data for energy plants. Generation of electricity and district heating, energy storage and energy carrier generation and conversion

    Energy Technology Data Exchange (ETDEWEB)

    2012-05-15

    The Danish Energy Agency and Energinet.dk, the Danish electricity transmission and system operator, have at regular intervals published a catalogue of energy producing technologies. The previous edition was published in June 2010. This report presents the results of the most recent update. The primary objective of publishing a technology catalogue is to establish a uniform, commonly accepted and up-to-date basis for energy planning activities, such as future outlooks, evaluations of security of supply and environmental impacts, climate change evaluations, and technical and economic analyses, e.g. on the framework conditions for the development and deployment of certain classes of technologies. With this scope in mind, it has not been the intention to establish a comprehensive catalogue, including all main gasification technologies or all types of electric batteries. Only selected, representative, technologies are included, to enable generic comparisons of e.g. thermal gasification versus combustion of biomass and electricity storage in batteries versus hydro-pumped storage. It has finally been the intention to offer the catalogue for the international audience, as a contribution to similar initiatives aiming at forming a public and concerted knowledge base for international analyses and negotiations. A guiding principle for developing the catalogue has been to rely primarily on well-documented and public information, secondarily on invited expert advice. Since many experts are reluctant in estimating future quantitative performance data, the data tables are not complete, in the sense that most data tables show several blank spaces. This approach has been chosen in order to achieve data, which to some extent are equivalently reliable, rather than to risk a largely incoherent data set including unfounded guesstimates. The current update has been developed with an unbalanced focus, i.e. most attention to technologies which are most essential for current and short

  20. Determination of leveled costs of electric generation for gas plants, coal and nuclear; Determinacion de costos nivelados de generacion electrica para plantas de gas, carbon y nucleares

    Energy Technology Data Exchange (ETDEWEB)

    Alonso V, G.; Palacios H, J.C.; Ramirez S, J.R.; Gomez, A. [ININ, 52045 Ocoyoacac, Estado de Mexico (Mexico)]. e-mail: galonso@nuclear.inin.mx

    2005-07-01

    The present work analyzes the leveled costs of electric generation for different types of nuclear reactors known as Generation III, these costs are compared with the leveled costs of electric generation of plants with the help of natural gas and coal. In the study several discount rates were used to determine their impact in the initial investment. The obtained results are comparable with similar studies and they show that it has more than enough the base of the leveled cost the nuclear option it is quite competitive in Mexico. Also in this study it is also thinks about the economic viability of a new nuclear power station in Mexico. (Author)

  1. Design criteria for the plant-microbial fuel cell : electricity generation with living plants : from lab tot application

    NARCIS (Netherlands)

    Helder, M.

    2012-01-01

    Om de processen die ten grondslag liggen aan de P-MBC (Plant-Microbiële Brandstofcel) en de factoren die zijn vermogen bepalen beter te begrijpen was het doel van dit proefschrift om design criteria voor de PMBC te bepalen. De eerste focus van de design criteria was om het vermogen van de P-MBC te

  2. Technical and economic analysis of electricity generation from forest, fossil, and wood-waste fuels in a Finnish heating plant

    International Nuclear Information System (INIS)

    Palander, Teijo

    2011-01-01

    The Finnish energy industry is subject to policy decisions regarding renewable energy production and energy efficiency. Conventional electricity generation has environmental side-effects that may cause global warming. Renewable fuels are superior because they offer near-zero net emissions. In this study, I investigated a heating mill's ability to generate electricity from forest fuels in southern Finland on a 1-year strategic decision-making horizon. I solved the electricity generation problem using optimization of the energy products and fuel mixtures based on energy efficiency and forest technology. The decision environment was complicated by the sequence-dependent procurement chains for forest fuels. The optimal product and fuel mixtures were selected by minimizing procurement costs, maximizing production revenues, and minimizing energy losses. The combinatorial complexity of the problem required the use of adaptive techniques to solve a multiple-objective linear programming system with industrial relevance. I discuss the properties of the decision-support system and methodology and illustrate pricing of electricity generation based on real industrial data. The electricity-generation, -purchase, and -sales decisions are made based on a comprehensive technical and economic analysis that accounts for procurement of local forest fuels in a holistic supply chain model. -- Highlights: → I use adaptive techniques to solve a multiple-objective linear programming system with industrial relevance. → I investigated a heating mill's ability to generate electricity from forest fuels. → The electricity-generation, -purchase, and -sales decisions are made based on a comprehensive technical and economic analysis. → The optimal product and fuel mixtures were selected by minimizing procurement costs, maximizing production revenues, and minimizing energy losses.

  3. Electric power plant technology. Generators, transformers, auxiliary installations, protective systems. Lecture notes. 5. rev. ed.; Elektrische Kraftwerkstechnik. Generatoren, Transformatoren, Eigenbedarfsanlagen, Schutzeinrichtungen. Vorlesungsskript

    Energy Technology Data Exchange (ETDEWEB)

    Wagner, Ulrich

    2009-07-01

    The lecture series on electric power plant engineering was initiated in 1969 by Prof. Helmut Schaefer, founder of the then department of power economy and power plant engineering. The lecture series was continuously updated in its contents and didactic approach, e.g. by integrating innovative power generation concepts like micro cogeneration plants and fuel cell systems. The focus is on the fundamentals and function of generators, main transformers, auxiliary installations and protective systems in power plant. Apart from the electrotechnical aspects, also aspects of mechanical engineering are gone into. Also discussed are energy conversion concepts fo renewable power generation plants like wind turbines and PV systems. This is the 5th, completely revised edition. It addresses primarily attendants of the lectures but may also serve as a textbook and reference manual for interested experts.

  4. Generation of electrical power

    International Nuclear Information System (INIS)

    Hursen, T.F.; Kolenik, S.A.; Purdy, D.L.

    1976-01-01

    A heat-to-electricity converter is disclosed which includes a radioactive heat source and a thermoelectric element of relatively short overall length capable of delivering a low voltage of the order of a few tenths of a volt. Such a thermoelectric element operates at a higher efficiency than longer higher-voltage elements; for example, elements producing 6 volts. In the generation of required power, the thermoelectric element drives a solid-state converter which is controlled by input current rather than input voltage and operates efficiently for a high signal-plus-noise to signal ratio of current. The solid-state converter has the voltage gain necessary to deliver the required voltage at the low input of the thermoelectric element

  5. Generation of electrical power

    Science.gov (United States)

    Hursen, Thomas F.; Kolenik, Steven A.; Purdy, David L.

    1976-01-01

    A heat-to-electricity converter is disclosed which includes a radioactive heat source and a thermoelectric element of relatively short overall length capable of delivering a low voltage of the order of a few tenths of a volt. Such a thermoelectric element operates at a higher efficiency than longer higher-voltage elements; for example, elements producing 6 volts. In the generation of required power, thermoelectric element drives a solid-state converter which is controlled by input current rather than input voltage and operates efficiently for a high signal-plus-noise to signal ratio of current. The solid-state converter has the voltage gain necessary to deliver the required voltage at the low input of the thermoelectric element.

  6. Safety Evaluation Report related to the operation of Vogtle Electric Generating Plant, Units 1 and 2 (Docket Nos. 50-424 and 50-425)

    International Nuclear Information System (INIS)

    1987-03-01

    In June 1985, the staff of the Nuclear Regulatory Commission issued its Safety Evaluation Report (NUREG-1137) regarding the application of Georgia Power Company, Municipal Electric Authority of Georgia, Oglethorpe Power Corporation, and the City of Dalton, Georgia, for licenses to operate the Vogtle Electric Generating Plant, Units 1 and 2 (Docket Nos. 50-424 and 50-425). This sixth supplement of NUREG-1137 provides recent information regarding resolution of some of the open and confirmatory items that remained unresolved at the time the Safety Evaluation Report was issued. These areas are performance testing, reactor cooling hydraulics, loose parts monitoring, and electric power systems

  7. A compilation of the electricity generated and low-level radioactive wastes shipped for disposal by US nuclear power plants, 1959-1985

    International Nuclear Information System (INIS)

    Kibbey, A.H.; DePaoli, S.M.

    1987-12-01

    The LWRDATA data base contains both volume and radioactivity data on nearly all the low-level radioactive waste (LLW) shipments from commercial boiling-water reactor (BWR) and pressurized-water reactor (PWR) nuclear power plants from 1959 through 1985. The corresponding net electrical output is also included in the data base. This report compares the various physical forms of LLW (i.e., wet; dry, compressible; irradiated, non-fuel core component; and miscellaneous) generated by BWR and PWR plants on the basis of their annual net electricity generation. Further comparisons are made of three specific categories of BWRs based on their size and condensate polishing systems: (1) small deep-bed plants, (2) large deep-bed plants, and (3) filter-demineralizer plants. The various types and volumes of PWR wastes generated per net megawatt (electrical)-year are also compared by nuclear steam supply system manufacturer. Limitations of the available data are discussed. 25 refs., 30 figs., 5 tabs

  8. Plant life extensions for German nuclear power plants? Controversial discussion on potential electricity price effects

    International Nuclear Information System (INIS)

    Matthes, Felix C.; Hermann, Hauke

    2009-06-01

    The discussions on electricity price effects in case of the plant life extension of German nuclear power plants covers the following topics: (1) Introduction and methodology. (2) Electricity generation in nuclear power plants and electricity price based on an empirical view: electricity generation in nuclear power plants and final consumption price for households and industry in the European Union; electricity generation in nuclear power plants and electricity wholesale price in case of low availability of nuclear power plants in Germany; comparison of electricity wholesale prices in Germany and France. (3) Model considerations in relation to electricity prices and nuclear phase-out. (4) Concluding considerations.

  9. Alternative solutions for electricity generation

    International Nuclear Information System (INIS)

    Kuenstle, K.

    1976-01-01

    Ten illustrations - mainly comparitive ones - dealing with the possibilities of an economical energy conversion, in particular electricity generation, in the FRG are explained and commented upon. (UA) [de

  10. Performance of Generating Plant: Managing the Changes. Supporting paper: The evolution of the electricity sector and renewable sources in Italy: opportunities and problems for wind power integration

    Energy Technology Data Exchange (ETDEWEB)

    Salvaderi, Luigi [IEEE Fellow (Italy)

    2008-05-15

    The WEC Committee on the Performance of Generating Plant (PGP) has been collecting and analysing power plant performance statistics worldwide for more than 30 years and has produced regular reports, which include examples of advanced techniques and methods for improving power plant performance through benchmarking. A series of reports from the various working groups was issued in 2008. This document serves as a supporting paper. Sections include: features of Italian energy and electricity; the evolution of liberalisation; support mechanism for renewables; connection to wind farm transmission network; wind source integration into power system; and, final comments.

  11. An Equitable Approach for Compensating Municipalities of the Rio Grande Watershed for Electricity Generated by the Furnas Hydropower Plant, Brazil

    Science.gov (United States)

    Ribeiro, C. A. A. S.; Mounts, D. J.; Menezes, S. C., Jr.; Rocha, R. R. C.; Chaves, M. A.; Castro, N. L. M.; Barros, K. O.; Martins, B. F.; Gleriani, J. M.; Soares, V. P.

    2015-04-01

    In Brazil, ninety percent of total electric power comes from renewable sources, where hydropower represents 2/3 of the national energy matrix. In 2012, the new Federal Forest Code eliminated environmental protection along drainage divides and reduced the mandatory width of riparian zones, allowing for land cover change in these environmentally sensitive areas. The conversion of forestlands to agriculture will subject hydroelectric reservoirs to a growing load of sediments, shortening their useful life. In this study of the Furnas hydropower plant and its contributing basin, in the upper reaches of the Rio Grande, a re-evaluation of factors that determine the distribution of finances accrued from hydroelectric generation is recommended. Under the current policy, royalties are paid by the Furnas facility to states and municipalities in direct relation to the area of land flooded by its reservoir, whereas contributing rainfall precipitating in municipalities upstream of the lake is not considered. Currently, the 31 municipalities with lands flooded by the reservoir receive an average of R 213,107 (US 67,226) annually, while the remaining 172 municipalities in the basin receive no water royalties. In the proposed approach to redistribute these funds, each of the 203 municipalities will receive compensation determined by their contributing catchment area, averaging R32,543 (US 10,266) per year. By considering distribution of rainfall in order to equitably allocate hydroelectric royalties, a system for the payment of environmental services is conceived. Such a system intends to incent stakeholders to protect or replant native forests along drainage divides and riparian zones, in recognition of the value this vegetation has in the reduction of long term costs for hydroelectric facilities.

  12. Geothermal electricity generation

    International Nuclear Information System (INIS)

    Eliasson, E.T.

    1991-01-01

    Geothermal conversion, as discussed here, is the conversion of the heat bound within the topmost three kilometres of the upper crust of the earth into useful energy, principally electricity. The characteristics of a geothermal reservoir and its individual technical features are highly site-specific. Applications therefore must be designed to match the specific geothermal reservoir. An estimate of the electric energy potential world-wide made by the Electric Power Research Institute (United States) in 1978 and based on sustaining a continuous 30-year operation is given in the box at the right for comparison purposes only. 8 refs, 5 figs

  13. Method for protecting an electric generator

    Science.gov (United States)

    Kuehnle, Barry W.; Roberts, Jeffrey B.; Folkers, Ralph W.

    2008-11-18

    A method for protecting an electrical generator which includes providing an electrical generator which is normally synchronously operated with an electrical power grid; providing a synchronizing signal from the electrical generator; establishing a reference signal; and electrically isolating the electrical generator from the electrical power grid if the synchronizing signal is not in phase with the reference signal.

  14. Draft environmental statement related to steam generator repair at H.B. Robinson Steam Electric Plant Unit No. 2, (Docket No. 50-261)

    International Nuclear Information System (INIS)

    1983-09-01

    The staff has considered the environmental impacts and economic costs of the proposed steam generator repair at the H.B. Robinson Steam Electric Plant Unit No. 2 along with reasonable alternatives to the proposed action. The staff has concluded that the proposed repair will not significantly affect the quality of the human environment and that there are no preferable alternatives to the proposed action. Furthermore, any impacts from the repair program are outweighted by its benefits

  15. Draft Environmental Statement related to the operation of Vogtle Electric Generating Plant, Units 1 and 2 (Docket Nos. 50-424 and 50-425)

    International Nuclear Information System (INIS)

    1984-10-01

    This Draft Environmental Statement contains an assessment of the environmental impact associated with the operation of the Vogtle Electric Generating Plant, Units 1 and 2, pursuant to the National Environmental Policy Act of 1969 (NEPA) and Title 10 of the Code of Federal Regulations, part 51 (10 CFR 51), as amended, of the Nuclear Regulatory Commission regulations. This statement examines the environmental impacts, environmental consequences and mitigating actions, and environmental and economic benefits and costs associated with station operation

  16. Tactical techno-economic analysis of electricity generation from forest, fossil, and wood waste fuels in a heating plant

    Directory of Open Access Journals (Sweden)

    Palander Teijo

    2012-01-01

    Full Text Available The Finnish energy industry is subject to policy decisions regarding renewable energy production and energy efficiency regulation. Conventional electricity generation has environmental side-effects that may cause global warming. Renewable fuels are superior because they offer near-zero net emissions. In this study, we investigated a heating mill's ability to generate electricity from forest fuels in southern Finland on a 1-year strategic decision-making horizon. The electricity-generation, -purchase, and -sales decisions are made using three different energy efficiency and forest technology rates. Then the decision environment was complicated by the sequence-dependent procurement chains for forest fuels (below-ground on a tactical decision-making horizon. With this aim, fuel data of three forest fuel procurement teams were collected for 3 months. The strategic fuel procurement decisions were adjusted to the changed decision environment based on a tactical techno-economic analysis using forest technology rates. The optimal energy product and fuel mixtures were solved by minimizing procurement costs, maximizing production revenues, and minimizing energy losses.

  17. Electricity Generation - National scenario

    International Nuclear Information System (INIS)

    Surendar, C.

    1997-01-01

    The activities of Nuclear Power Corporation of India on implementation of the India's nuclear power programme are described. The parameters of Tarapur, Rajasthan, Madras, Narora, Kakrapar nuclear power plants are presented, including issues of safety management

  18. Expansion planning for electrical generating systems

    International Nuclear Information System (INIS)

    1984-01-01

    The guidebook outlines the general principles of electric power system planning in the context of energy and economic planning in general. It describes the complexities of electric system expansion planning that are due to the time dependence of the problem and the interrelation between the main components of the electric system (generation, transmission and distribution). Load forecasting methods are discussed and the principal models currently used for electric system expansion planning presented. Technical and economic information on power plants is given. Constraints imposed on power system planning by plant characteristics (particularly nuclear power plants) are discussed, as well as factors such as transmission system development, environmental considerations, availability of manpower and financial resources that may affect the proposed plan. A bibliography supplements the references that appear in each chapter, and a comprehensive glossary defines terms used in the guidebook

  19. Realistic generation cost of solar photovoltaic electricity

    International Nuclear Information System (INIS)

    Singh, Parm Pal; Singh, Sukhmeet

    2010-01-01

    Solar photovoltaic (SPV) power plants have long working life with zero fuel cost and negligible maintenance cost but requires huge initial investment. The generation cost of the solar electricity is mainly the cost of financing the initial investment. Therefore, the generation cost of solar electricity in different years depends on the method of returning the loan. Currently levelized cost based on equated payment loan is being used. The static levelized generation cost of solar electricity is compared with the current value of variable generation cost of grid electricity. This improper cost comparison is inhibiting the growth of SPV electricity by creating wrong perception that solar electricity is very expensive. In this paper a new method of loan repayment has been developed resulting in generation cost of SPV electricity that increases with time like that of grid electricity. A generalized capital recovery factor has been developed for graduated payment loan in which capital and interest payment in each installment are calculated by treating each loan installment as an independent loan for the relevant years. Generalized results have been calculated which can be used to determine the cost of SPV electricity for a given system at different places. Results show that for SPV system with specific initial investment of 5.00 cents /kWh/year, loan period of 30 years and loan interest rate of 4% the levelized generation cost of SPV electricity with equated payment loan turns out to be 28.92 cents /kWh, while the corresponding generation cost with graduated payment loan with escalation in annual installment of 8% varies from 9.51 cents /kWh in base year to 88.63 cents /kWh in 30th year. So, in this case, the realistic current generation cost of SPV electricity is 9.51 cents /kWh and not 28.92 cents /kWh. Further, with graduated payment loan, extension in loan period results in sharp decline in cost of SPV electricity in base year. Hence, a policy change is required

  20. Heat operated cryogenic electrical generator

    International Nuclear Information System (INIS)

    Fletcher, J.C.; Wang, T.C.; Saffren, M.M.; Elleman, D.D.

    1975-01-01

    An electrical generator useful for providing electrical power in deep space, is disclosed. The subject electrical generator utilizes the unusual hydrodynamic property exhibited by liquid helium as it is converted to and from a superfluid state to cause opposite directions of rotary motion for a rotor cell thereof. The physical motion of said rotor cell is employed to move a magnetic field provided by a charged superconductive coil mounted on the exterior of said cell. An electrical conductor is placed in surrounding proximity to said cell to interact with the moving magnetic field provided by the superconductive coil and thereby generate electrical energy. A heat control arrangement is provided for the purpose of causing the liquid helium to be partially converted to and from a superfluid state by being cooled and heated, respectively. (U.S.)

  1. The projected costs of electricity generation

    International Nuclear Information System (INIS)

    Cameron, R.; Keppler, J. H.

    2010-10-01

    This paper describes the outcomes from the joint report between the Nuclear Energy Agency and the International Energy Agency of the OECD on the projected costs of generating electricity. The study contains data on electricity generating costs for almost 200 power plants provided by 17 OECD member countries, 4 non-OECD countries and 4 industrial companies or industry organisations. The paper presents the projected costs of generating electricity calculated according to common methodological rules on the basis of the data provided by participating countries and organisations. Data were received for a wide variety of fuels and technologies, including coal, gas, nuclear, hydro, onshore and offshore wind, biomass, solar, wave and tidal. Cost estimates were also provided for combined heat and power plants, as well as for coal plants that include carbon capture. As in previous studies of the same series, all costs and benefits were discounted or capitalised to the date of commissioning in order to calculate the state of the electricity costs per MWh, based on plant operating lifetime data. In addition, the paper contains a discussion of a number of factors affecting the cost of capital, the outlook for carbon capture and storage and the working of electricity markets. (Author)

  2. Safety evaluation report related to steam generator repair at H.B. Robinson Steam Electric Plant, Unit No. 2. Docket No. 50-261

    International Nuclear Information System (INIS)

    1983-11-01

    A Safety Evaluation Report was prepared for the H.B. Robinson Steam Electric Plant Unit No. 2 by the Office of Nuclear Reactor Regulation. This report considers the safety aspects of the proposed steam generator repair at H.B. Robinson Steam Electric Plant Unit No. 2. The report focuses on the occupational radiation exposure associated with the proposed repair program. It concludes that there is reasonable assurance that the health and safety on the public will not be endangered by the conduct of the proposed action, such activities will be conducted in compliance with the Commission's regulations, and the issuance of this amendment will not be inimical to the common defense and security or the health and safety of the public

  3. Resolution 139/012. It authorize to RIO MIRADOR S.A company to generate a wind electricity source by a generating plant located in Maldonado town 5a. Catastral section, as well as the connection to the Interconnected National System

    International Nuclear Information System (INIS)

    2013-01-01

    This Resolution authorizes the generation of electricity using wind energy as the primary electricity source. This project was presented by RIO MIRADOR S.A wind generation company with the proposal to instal an electrical plant in Maldonado town. This authorization is according to the Electric Wholesale Market regulation

  4. New electricity generating installations - Czech experience

    International Nuclear Information System (INIS)

    Biza, K.; Pazdera, F.; Zdarek, J.

    2004-01-01

    Economically and technically are analysed alternatives for new electricity generation installations (GEN 111+ NPPs, finalization of NPPs under construction, lifetime extension of existing NPPs, coal plants and gas plants). Described are experienced with NPP Temelin (lessons learned from its design, construction, start-up and resent operation and service experience) and new Czech Energy Policy, where the nuclear energy is an important source for electricity generation. Discussed is also impact of potential trading with CO 2 limits and strategy on minimization of dependence on energy from politically unstable regions. Underlined is important role of preparation of young generation for safe and reliable long term operation of NPPs. General recommendation is to orient on finalization of NPPs under construction, lifetime extension of existing NPPs and long term orientation on new generation of NPPs (GEN III+ and GEN IV). (author)

  5. Generation of Electricity Using Spartina Patens with Stainless Steel Current Collectors in a Plant-Microbial Fuel Cell

    Science.gov (United States)

    Narula, Deep

    At present, the global energy infrastructure is highly dependent on (i) non-renewable fossil fuels with significant emissions of greenhouse gasses (ii) green fuels such as bioethanol and biodiesel with impact on current agricultural practices competing with food production for arable lands, fertilizers, also requiring additional energy input. Plant-based microbial fuel cell (PMFC) technology can be found as a promising alternative to produce electricity without any side effects with an advantage of using sunlight as an energy source. In the present study, we developed PMFCs using Spartina patens, a marshland grass, abundantly available in the coastal regions of the USA. Figure 1 is a schematic for a PMFC with the anode and cathode compartments where others have used carbon-based electrodes for current collection. In contrast, we attempted to utilize stainless steel wires with more surface area to enhance the current collection in the anode compartment as well as to increase the rate of reduction in the cathode chamber and thereby increase the amount of electricity produced. The study will give results on the periodic use of Spartina patens in PMFC along with the porous stainless steel electrodes which have never been employed in PMFCs before.

  6. Validation of a methodology for the study of generation cost of electric power for nuclear power plants; Validacion de una metodologia para el estudio de costos de generacion de electricidad de plantas nucleares de potencia

    Energy Technology Data Exchange (ETDEWEB)

    Ortega C, R.F.; Martin del Campo M, C. [Facultad de Ingenieria, UNAM, Laboratorio de Analisis en Ingenieria de Reactores Nucleares, Paseo Cuauhnahuac 8532, 62550, Jiutepec, Morelos (Mexico)]. E-mail: rfortega@mexis.com

    2004-07-01

    It was developed a model for the calculation of costs of electric generation of nuclear plants. The developed pattern was validated with the one used by the United States Council for Energy Awareness (USCEA) and the Electric Power Research Institute (EPRI), in studies of comparison of alternatives for electric generation of nuclear plants and fossil plants with base of gas and of coal in the United States described in the guides calls Technical Assessment Guides of EPRI. They are mentioned in qualitative form some changes in the technology of nucleo electric generation that could be included in the annual publication of Costs and Parameters of Reference for the Formulation of Projects of Investment in the Electric Sector of the Federal Commission of Electricity. These changes are in relation to the advances in the technology, in the licensing, in the construction and in the operation of the reactors called advanced as the A BWR built recently in Japan. (Author)

  7. Safety evaluation report related to the operation of Vogtle Electric Generating Plant, Units 1 and 2 (Docket Nos. 50-424 and 50-425)

    International Nuclear Information System (INIS)

    1988-01-01

    In June 1985, the staff of the Nuclear Regulatory Commission issued its Safety Evaluation Report (NUREG-1137) regarding the application of Georgia Power Company, Municipal Electric Authority of Georgia, Oglethorpe Power Corporation, and the City of Dalton, Georgia, for licenses to operate Vogtle Electric Generating Plant, Units 1 and 2 (Docket Nos. 50-424 and 50-425). The facility is located in Burke County, Georgia, approximately 26 miles south-southeast of Augusta, Georgia, and on the Savannah River. This seventh supplement to NUREG-1137 provides recent information regarding resolution of some of the open and confirmatory items that remained unresolved following issuance of Supplement 6, and documents completion of several Unit 1 license conditions

  8. Safety evaluation report related to the operation of Vogtle Electric Generating Plant, Units 1 and 2 (Docket Nos. 50-424 and 50-425)

    International Nuclear Information System (INIS)

    1987-01-01

    In June 1985, the staff of the Nuclear Regulatory Commission issued its Safety Evaluation Report (NUREG-1137) regarding the application of Georgia Power Company, Municipal Electric Authority of Georgia, Oglethorpe Power Corporation, and the City of Dalton, Georgia, for licenses to operate the Vogtle Electric Generating Plant, Units 1 and 2 (Docket Nos. 50-424 and 50-425). Supplement 1 to NUREG-1137 was issued by the staff in October 1985, Supplement 2 was issued in May 1986, Supplement 3 was issued in August 1986, and Supplement 4 was issued in December 1986. The facility is located in Burke County, Georgia, approximately 26 miles south-southeast of Augusta, Georgia, and on the Savannah River. This fifth supplement to NUREG-1137 provides recent information regarding resolution of some of the open and confirmatory items that remained unresolved at the time the Safety Evaluation Report was issued

  9. Safety Evaluation Report related to the operation of Vogtle Electric Generating Plant, Units 1 and 2 (Docket Nos. 50-424 and 50-425). Supplement No. 2

    International Nuclear Information System (INIS)

    1986-05-01

    In June 1985, the staff of the Nuclear Regulatory Commission issued its Safety Evaluation Report (NUREG-1137) regarding the application of Georgia Power Company, Municipal Electric Authority of Georgia, Oglethorpe Power Corporation, and City of Dalton, Georgia, for a license to operate the Vogtle Electric Generating Plant, Units 1 and 2 (Docket Nos. 50-424 and 50-425). Supplement 1 to NUREG-1137 was issued by the staff in October 1985. The facility is located in Burke County, Georgia, approximately 26 miles south-southeast of Augusta, Georgia, and on the Savannah River. This second supplement to NUREG-1137 provides recent information regarding resolution of some of the open and confirmatory items that remained unresolved at the time the Safety Evaluation Report was issued. This supplement also discusses some new open and confirmatory items

  10. Safety Evaluation Report related to the operation of Vogtle Electric Generating Plant, Units 1 and 2 (Docket Nos. 50-424 and 50-425). Supplement No. 3

    International Nuclear Information System (INIS)

    1986-08-01

    In June 1985, the staff of the Nuclear Regulatory Commission issued its Safety Evaluation Report (NUREG-1137) regarding the application of Georgia Power Company, Municipal Electric Authority of Georgia, Oglethorpe Power Corporation, and City of Dalton, Georgia, for a license to operate the Vogtle Electric Generating Plant, Units 1 and 2 (Docket Nos. 50-424 and 50-425). Supplement 1 to NUREG-1137 was issued by the staff in October 1985, and Supplement 2 was issued in May 1986. The facility is located in Burke County, Georgia, approximately 26 miles south-southeast of Augusta, Georgia, and on the Savannah River. This third supplement to NUREG-1137 provides recent information regarding resolution of some of the open and confirmatory items that remained unresolved at the time the Safety Evaluation Report was issued. This supplement also discusses some new open items

  11. Safety Evaluation Report related to the operation of Vogtle Electric Generating Plant, Units 1 and 2 (Docket Nos 50-424 and 50-425)

    International Nuclear Information System (INIS)

    1985-06-01

    The Safety Evaluation Report for the application filed by Georgia Power Company, Municipal Electric Authority of Georgia, Oglethorpe Power Corporation, and City of Dalton, Georgia, as applicants and owners, for licenses to operate the Vogtle Electric Generating Plant, Units 1 and 2 (Docket Nos. 50-424 and 50-425), has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is located in Burke County, Georgia, approximately 41.5 km (26 mi) south-southeast of Augusta, and on the Savannah River. Subject to favorable resolution of the items discussed in this report, the staff concludes that the applicant can operate the facility without endangering the health and safety of the public

  12. Trends in Japan's power generation costs after the Fukushima Daiichi Nuclear Power Plant accident and their influence on finance of electric utilities

    International Nuclear Information System (INIS)

    Matsuo, Yuhji; Yamaguchi, Yuhji; Murakami, Tomoko

    2013-01-01

    Following the Fukushima Daiichi nuclear power plant accident, the nuclear reactors that were suspended for periodic inspections after the Fukushima accident were not permitted to resume operation, and nuclear power generation in Japan continued to decline. In this article, the authors quantitatively evaluated the effects on power generation costs of Japan's situation, using electric utilities financial reports up to FY 2011. We also analyzed the profitability of the Japanese electric industry, using the financial statements included in the reports, and quantitatively evaluated the effects of changes in power generation costs. The total cost of power generation has increased from 7.5 trillion yen in FY 2010 before the Fukushima accident to 9.6 trillion yen in FY 2011 and to 10.6 trillion yen in FY 2012. In particular, the fuel cost for thermal power generation rose sharply from 3.7 trillion yen in FY 2010 to 6.1 trillion yen in FY 2011 and 7.3 trillion yen in FY 2012, almost doubling in the two years from FY 2010 to 2012. The unit cost of power generation rose sharply from 8.6 yen/kWh in FY 2010 to 11.8 yen/kWh in FY 2011 and 13.5 yen/kWh in FY 2012. The unit cost is expected to rise even further in FY 2013 due to the weak yen. As the result not only Tokyo Electric Power Company, but also the other general electric utilities registered huge net losses. Their retained earnings (total of eight utilities) dropped by 2 trillion yen between FY 2010 and 2012. With increased thermal power generation, the risk of rising costs associated with changes in primary energy prices and exchange rates has increased drastically. For the stability of the electricity industry and the development of the Japanese economy, the government should clearly formulate a basic policy regarding the composition of power sources, and an effective plan both at home and abroad, and should develop a system that will be also to handle sudden changes in the composition of power sources. (author)

  13. Electricity generation using electromagnetic radiation

    Science.gov (United States)

    Halas, Nancy J.; Nordlander, Peter; Neumann, Oara

    2017-08-22

    In general, in one aspect, the invention relates to a system to create vapor for generating electric power. The system includes a vessel comprising a fluid and a complex and a turbine. The vessel of the system is configured to concentrate EM radiation received from an EM radiation source. The vessel of the system is further configured to apply the EM radiation to the complex, where the complex absorbs the EM radiation to generate heat. The vessel of the system is also configured to transform, using the heat generated by the complex, the fluid to vapor. The vessel of the system is further configured to sending the vapor to a turbine. The turbine of the system is configured to receive, from the vessel, the vapor used to generate the electric power.

  14. 1-MWp electrical photovoltaic plant (EPHOP - project)

    International Nuclear Information System (INIS)

    Vitanov, P.; Toneva, A.; Petkanchin, L.; Ivancheva, J.; Neshev, S.

    2000-01-01

    The presented project concerns the realization of a grid connected 1-MW p pilot photovoltaic plant on the territory of Bulgaria.The purpose of the project is to demonstrate and prove solar energy advantages. A special attention will be paid to the possibility the generated electricity to join the national electric network. The site selection according to the meteorological conditions as well as general aspects of the project are discussed

  15. Twenty years of electricity generation in Olkiluoto

    International Nuclear Information System (INIS)

    Piirto, A.

    1998-01-01

    It will be twenty years to the day on September 2, 1998 that the Olkiluoto-1 nuclear generating unit was first synchronized with the public power grid. Finnish industry in 1969 founded Teollisuuden Voima Oy to meet part of the rapidly growing basic electricity requirement. The partners backed a large power plant project for which nuclear power was soon chosen as the energy source. The largest joint venture of Finnish industry, which was also chosen as the energy source. The largest joint venture of Finnish industry, which was also the largest power plant project at that time, was born. Training the operating personnel of the Olkiluoto unit I was begun in 1975. After a long test and commissioning phase, the authorities in summer 1978 gave permission for the start of nuclear operation. At 5.46 h in the morning of September 2, 1978, the long-awaited moment had come: Olkiluoto-I 1 was connected to the power grid, and the kWh meter began to count the electricity produced. This moment crowned the achievement of five years of hard construction work. For the past twenty years, TVO has generated electricity for its partners safely and cost-effectively. In the course of these years, nuclear power production in Finland has reached the level of the world's best producers. One fifth of the electricity consumed in Finland is generated in Olkiluoto. (orig.) [de

  16. Coal based electric generation comparative technologies report

    Energy Technology Data Exchange (ETDEWEB)

    1989-10-26

    Ohio Clean Fuels, Inc., (OCF) has licensed technology that involves Co-Processing (Co-Pro) poor grade (high sulfur) coal and residual oil feedstocks to produce clean liquid fuels on a commercial scale. Stone Webster is requested to perform a comparative technologies report for grassroot plants utilizing coal as a base fuel. In the case of Co-Processing technology the plant considered is the nth plant in a series of applications. This report presents the results of an economic comparison of this technology with other power generation technologies that use coal. Technologies evaluated were:Co-Processing integrated with simple cycle combustion turbine generators, (CSC); Co-Processing integrated with combined cycle combustion turbine generators, (CCC); pulverized coal-fired boiler with flue gas desulfurization and steam turbine generator, (PC) and Circulating fluidized bed boiler and steam turbine generator, (CFB). Conceptual designs were developed. Designs were based on approximately equivalent net electrical output for each technology. A base case of 310 MWe net for each technology was established. Sensitivity analyses at other net electrical output sizes varying from 220 MWe's to 1770 MWe's were also performed. 4 figs., 9 tabs.

  17. Generating Renewable Electricity from Food Waste

    Directory of Open Access Journals (Sweden)

    Mydin M.A.O.

    2014-01-01

    Full Text Available Mini biogas power plant (MBPP was first used and launched in Malaysia by Universiti Sains Malaysia (USM. USM with the collaboration with Enerbon Sdn Bhd had set up this mini biogas power plant as an education and research and development tools to professionals and researchers and at the same time giving opportunities to people who are interested with this system to witness and experience it themselves by looking at how this mini biogas power plant works. There are 2 main objectives of this study being carried out; firstly to determine whether food wastes (canteen and cafeterias wastes can produce methane gas (biogas that can generate heat and electricity and secondly to establish how much methane gas (biogas can be produced with the certain amount of the feedstock. It should be pointed out that this MBPP can generate 600kW electricity per day as this system can generate electricity about 25kW/h. The methane produced per day is approximately 180 cubic metres. The higher the wastes, the higher the amount of methane gas produced. The cow dung is used to increase the bacteria in the tank; the methane gas production will be higher if the bacteria breed.

  18. Apparatuses and methods for generating electric fields

    Science.gov (United States)

    Scott, Jill R; McJunkin, Timothy R; Tremblay, Paul L

    2013-08-06

    Apparatuses and methods relating to generating an electric field are disclosed. An electric field generator may include a semiconductive material configured in a physical shape substantially different from a shape of an electric field to be generated thereby. The electric field is generated when a voltage drop exists across the semiconductive material. A method for generating an electric field may include applying a voltage to a shaped semiconductive material to generate a complex, substantially nonlinear electric field. The shape of the complex, substantially nonlinear electric field may be configured for directing charged particles to a desired location. Other apparatuses and methods are disclosed.

  19. Reducing landscape restoration costs: Feasibility of generating electricity from invasive alien plant biomass on the Agulhas Plain, South Africa

    CSIR Research Space (South Africa)

    Stafford, William

    2017-06-01

    Full Text Available products and bioenergy. Using the Agulhas Plain as a case study, we assess the feasibility of using IAP biomass in modular 250 kWe wood gasifiers to produce electricity with biochar as a co-product. There is sufficient IAP biomass available over a 15 year...

  20. Reverse electrodialysis performed at pilot plant scale: Evaluation of redox processes and simultaneous generation of electric energy and treatment of wastewater.

    Science.gov (United States)

    D'Angelo, Adriana; Tedesco, Michele; Cipollina, Andrea; Galia, Alessandro; Micale, Giorgio; Scialdone, Onofrio

    2017-11-15

    This paper describes the experimental campaign carried out with a reverse electrodialysis (RED) demonstration plant (Marsala, Italy) with the main aims of: (i) evaluating the effect of various operating parameters, including the redox processes, on the system performances; (ii) using the plant for the simultaneous generation of electric energy and treatment of wastewater. The prototype (44 × 44 cm 2 , 500 cell pairs) was tested using both real (brackish water and brine) and artificial solutions. Tests with two different electrode rinse solutions (with or without iron redox couples) were performed. In agreement with the data obtained in the laboratory, the presence of iron ions contributes positively to the power production. The effect of flow rates in the electrode and saline compartments, as well as aging of the electrode rinse solution was also investigated. The possibility to remove an organic pollutant (the azoic dye Acid Orange 7) from the electrode solution was tested, obtaining a very fast and total removal of the pollutant. This experimental campaign represents the first demonstration in a real environment of the abilities of a RED plant to treat wastewater, thus giving useful indications for the spreading of RED technology in the near future. Copyright © 2017. Published by Elsevier Ltd.

  1. Life cycle assessment of photovoltaic electricity generation

    International Nuclear Information System (INIS)

    Stoppato, A.

    2008-01-01

    The paper presents the results of a life cycle assessment (LCA) of the electric generation by means of photovoltaic panels. It considers mass and energy flows over the whole production process starting from silica extraction to the final panel assembling, considering the most advanced and consolidate technologies for polycrystalline silicon panel production. Some considerations about the production cycle are reported; the most critical phases are the transformation of metallic silicon into solar silicon and the panel assembling. The former process is characterised by a great electricity consumption, even if the most efficient conversion technology is considered, the latter by the use of aluminium frame and glass roofing, which are very energy-intensive materials. Moreover, the energy pay back time (EPBT) and the potential for CO 2 mitigation have been evaluated, considering different geographic collocations of the photovoltaic plant with different values of solar radiation, latitude, altitude and national energetic mix for electricity production

  2. The Next Generation Nuclear Plant

    Energy Technology Data Exchange (ETDEWEB)

    Dr. David A. Petti

    2009-01-01

    The Next Generation Nuclear Plant (NGNP) will be a demonstration of the technical, licensing, operational, and commercial viability of High Temperature Gas-Cooled Reactor (HTGR) technology for the production of process heat, electricity, and hydrogen. This nuclear- based technology can provide high-temperature process heat (up to 950°C) that can be used as a substitute for the burning of fossil fuels for a wide range of commercial applications (see Figure 1). The substitution of the HTGR for burning fossil fuels conserves these hydrocarbon resources for other uses, reduces uncertainty in the cost and supply of natural gas and oil, and eliminates the emissions of greenhouse gases attendant with the burning of these fuels. The HTGR is a passively safe nuclear reactor concept with an easily understood safety basis that permits substantially reduced emergency planning requirements and improved siting flexibility compared to other nuclear technologies.

  3. Safety evaluation report related to the operation of Vogtle Electric Generating Plant, Units 1 and 2 (Docket Nos. 50-424 and 50-425)

    International Nuclear Information System (INIS)

    1989-03-01

    In June 1985, the staff of the Nuclear Regulatory Commission issued its Safety Evaluation Report (NUREG-1137) regarding the application of Georgia Power Company, Municipal Electric Authority of Georgia, Oglethorpe Power Corporation, and the City of Dalton, Georgia, for licenses to operate the Vogtle Electric Generating Plant, Units 1 and 2 (Docket Nos. 50-424 and 50-425). Supplement 1 to NUREG-1137 was issued by the staff in October 1985, Supplement 2 was issued in May 1986, Supplement 3 was issued in August 1986, Supplement 4 was issued in December 1986, Supplement 5 was issued in January 1987, Supplement 6 was issued in March 1987, Supplement 7 was issued in January 1988, and Supplement 8 was issued in February 1989. The facility is located in Burke County, Georgia, approximately 26 miles south-southeast of Augusta, Georgia, and on the Savannah River. This ninth supplement to NUREG-1137 provides recent information regarding resolution of conditional items following issuance of Supplement 8

  4. Electricity generation of Maritsa-Iztok coal-fired power plant in Bulgaria and its complex impact on the environment

    International Nuclear Information System (INIS)

    Mitrikov, M.; Antonov, A.; Hristov, Hr.

    2001-01-01

    Soil, water and vegetable samples from the region of Maritsa-Iztok Coal-Fired Power Plants (CFPP) in Bulgaria have been studied using a large variety of methods for analysis: γ- and neutron activation analysis, γ-spectrometry, radiometry, mass- spectrometry, physicochemical analysis, soil sciences study. Detailed information about the concentration of ecologically important elements in the chain coal bottom ash, fly ashes environment (soil, water, air, vegetation) has been obtained, allowing to estimate the present ecological state of the region. (author)

  5. Solar energy thermally powered electrical generating system

    Science.gov (United States)

    Owens, William R. (Inventor)

    1989-01-01

    A thermally powered electrical generating system for use in a space vehicle is disclosed. The rate of storage in a thermal energy storage medium is controlled by varying the rate of generation and dissipation of electrical energy in a thermally powered electrical generating system which is powered from heat stored in the thermal energy storage medium without exceeding a maximum quantity of heat. A control system (10) varies the rate at which electrical energy is generated by the electrical generating system and the rate at which electrical energy is consumed by a variable parasitic electrical load to cause storage of an amount of thermal energy in the thermal energy storage system at the end of a period of insolation which is sufficient to satisfy the scheduled demand for electrical power to be generated during the next period of eclipse. The control system is based upon Kalman filter theory.

  6. Projected costs of generating electricity - 2010 edition

    International Nuclear Information System (INIS)

    2010-01-01

    This joint report by the International Energy Agency (IEA) and the OECD Nuclear Energy Agency (NEA) is the seventh in a series of studies on electricity generating costs. It presents the latest data available for a wide variety of fuels and technologies, including coal and gas (with and without carbon capture), nuclear, hydro, onshore and offshore wind, biomass, solar, wave and tidal as well as combined heat and power (CHP). It provides levelised costs of electricity (LCOE) per MWh for almost 200 plants, based on data covering 21 countries (including four major non-OECD countries), and several industrial companies and organisations. For the first time, the report contains an extensive sensitivity analysis of the impact of variations in key parameters such as discount rates, fuel prices and carbon costs on LCOE. Additional issues affecting power generation choices are also examined. The study shows that the cost competitiveness of electricity generating technologies depends on a number of factors which may vary nationally and regionally. Readers will find full details and analyses, supported by over 130 figures and tables, in this report which is expected to constitute a valuable tool for decision makers and researchers concerned with energy policies and climate change

  7. Simulation and Particle-Tracking Analysis of Selected Ground-Water Pumping Scenarios at Vogtle Electric Generation Plant, Burke County, Georgia

    Science.gov (United States)

    Cherry, Gregory S.; Clarke, John S.

    2007-01-01

    The source of ground water to production wells at Vogtle Electric Generation Plant (VEGP), a nuclear power plant in Burke County, Georgia, was simulated under existing (2002) and potential future pumping conditions using an existing U.S. Geological Survey (USGS) MODFLOW ground-water flow model of a 4,455-square-mile area in the Coastal Plain of Georgia and South Carolina. Simulation results for three steady-state pumping scenarios were compared to each other and to a 2002 Base Case condition. The pumping scenarios focused on pumping increases at VEGP resulting from projected future demands and the addition of two electrical-generating reactor units. Scenarios simulated pumping increases at VEGP ranging from 1.09 to 3.42 million gallons per day (Mgal/d), with one of the scenarios simulating the elimination of 5.3 Mgal/d of pumping at the Savannah River Site (SRS), a U.S. Department of Energy facility located across the Savannah River from VEGP. The largest simulated water-level changes at VEGP were for the scenario whereby pumping at the facility was more than tripled, resulting in drawdown exceeding 4-8 feet (ft) in the aquifers screened in the production wells. For the scenario that eliminated pumping at SRS, water-level rises of as much as 4-8 ft were simulated in the same aquifers at SRS. Results of MODFLOW simulations were analyzed using the USGS particle-tracking code MODPATH to determine the source of water and associated time of travel to VEGP production wells. For each of the scenarios, most of the recharge to VEGP wells originated in an upland area near the county line between Burke and Jefferson Counties, Georgia, with none of the recharge originating on SRS or elsewhere in South Carolina. An exception occurs for the scenario whereby pumping at VEGP was more than tripled. For this scenario, some of the recharge originates in an upland area in eastern Barnwell County, South Carolina. Simulated mean time of travel from recharge areas to VEGP wells for the

  8. Impact of decommissioning on electricity generation costs

    International Nuclear Information System (INIS)

    Crijns, M.J.; Vira, J.

    1987-01-01

    By definition, the levelized decommissioning cost is the weighted average cost that should be charged for each unit of electricity produced through the lifetime of the facility, to precisely cover all the costs that the decommissioning of the facility give rise to. Although the mode in which decommissioning costs enter the electricity rates depends on utility and regulatory practices, the levelization offers a consistent means for estimating the cost impact of decommissioning. An international group of experts, called together under the auspices of the OECD Nuclear Energy Agency (NEA), has prepared estimates on levelized decommissioning costs for nuclear power plants, starting from the cost information provided by some of its Member countries. Three basic strategies for decommissioning were considered, including immediate dismantling and two strategies for deferred dismantling. The Working Group calculated the levelized decommissioning costs for several assumptions on discount rates and reactor lifetimes. The calculations showed that decommissioning has a very small impact on electricity generation cost of a large nuclear power plant. The uncertainties in cost estimates, applicable interest rates or facility operating lifetimes are large but still unlikely to significantly affect this conclusion

  9. Production function application attempt in electricity generation forecasting

    International Nuclear Information System (INIS)

    Kamrat, W.; Augusiak, A.

    1996-01-01

    A modified Cobb-Douglas production function is applied to evaluate level of electricity generation for medium and long term prognosis (up to 2010) in an easy and simple way. The test calculations have been done for hard coal fired power plants, based on generation data supplied in Main Statistical Office of Poland publications.The model of electricity generation is defined using data on capital of a typical productivity power plant and its employment for time series 1980-90. The test calculation results based on the parameters of Rosenbroock's optimization procedure of electricity generation model are presented. The method described is distinguished for its high accuracy as compared to classical methods despite the relatively short time series. It is suitable for studies in electricity generation policy . 1 tab

  10. Electric vehicle charge patterns and the electricity generation mix and competitiveness of next generation vehicles

    International Nuclear Information System (INIS)

    Masuta, Taisuke; Murata, Akinobu; Endo, Eiichi

    2014-01-01

    Highlights: • The energy system of whole of Japan is analyzed in this study. • An advanced model based on MARKAL is used for the energy system analysis. • The impact of charge patterns of EVs on electricity generation mix is evaluated. • Technology competitiveness of the next generation vehicles is also evaluated. - Abstract: The nuclear accident of 2011 brought about a reconsideration of the future electricity generation mix of power systems in Japan. A debate on whether to phase out nuclear power plants and replace them with renewable energy sources is taking place. Demand-side management becomes increasingly important in future Japanese power systems with a large-scale integration of renewable energy sources. This paper considers the charge control of electric vehicles (EVs) through demand-side management. There have been many studies of the control or operation methods of EVs known as vehicle-to-grid (V2G), and it is important to evaluate both their short-term and long-term operation. In this study, we employ energy system to evaluate the impact of the charge patterns of EVs on both the electricity generation mix and the technology competitiveness of the next generation vehicles. An advanced energy system model based on Market Allocation (MARKAL) is used to consider power system control in detail

  11. Electrical power generation by mechanically modulating electrical double layers.

    Science.gov (United States)

    Moon, Jong Kyun; Jeong, Jaeki; Lee, Dongyun; Pak, Hyuk Kyu

    2013-01-01

    Since Michael Faraday and Joseph Henry made their great discovery of electromagnetic induction, there have been continuous developments in electrical power generation. Most people today get electricity from thermal, hydroelectric, or nuclear power generation systems, which use this electromagnetic induction phenomenon. Here we propose a new method for electrical power generation, without using electromagnetic induction, by mechanically modulating the electrical double layers at the interfacial areas of a water bridge between two conducting plates. We find that when the height of the water bridge is mechanically modulated, the electrical double layer capacitors formed on the two interfacial areas are continuously charged and discharged at different phases from each other, thus generating an AC electric current across the plates. We use a resistor-capacitor circuit model to explain the results of this experiment. This observation could be useful for constructing a micro-fluidic power generation system in the near future.

  12. Electrical power generating system. [for windpowered generation

    Science.gov (United States)

    Nola, F. J. (Inventor)

    1981-01-01

    An alternating current power generation system adopted to inject power in an already powered power line is discussed. The power generating system solves to adjustably coup an induction motor, as a generator, to an ac power line wherein the motor and power line are connected through a triac. The triac is regulated to normally turn on at a relatively late point in each half cycle of its operation, whereby at less than operating speed, and thus when the induction motor functions as a motor rather than as a generator, power consumption from the line is substantially reduced. The principal application will be for windmill powered generation.

  13. Seismic and dynamic qualification of safety-related electrical and mechanical equipment in operating nuclear power plants: development of a method to generate generic floor-response spectra

    International Nuclear Information System (INIS)

    Curreri, J.; Costantino, C.; Subudhi, M.; Reich, M.

    1983-09-01

    Generic floor response spectra were developed for use in the qualification of electrical and mechanical equipment in operating nuclear power plants. The characteristics of 1000 floor response spectra were studied to determine the generic spectra. The procedure developed uses as much or as little information that currently exists at the plant relating to the question of equipment qualification. The general approach was to study the effects on the dynamic characteristics of each of the elements in the chain of events that goes between the loads and the responses. This includes the loads, the soils and the structures. A free-field earthquake response spectra was used to generate horizontal earthquake time histories. The excitation was applied through the soil and into the various structures to produce responses in equipment. An entire range of soil conditions was used with each structure. Actual PWR and BWR - Mark I structural models were used. For each model, the stiffness properties were varied, with the same mass, so as to extend the fundamental base structure natural frequency from 2 cps to 36 cps. The natural frequencies of the structures were varied to obtain maximum response conditions. The actual properties were first used to locate the natural frequencies. The stiffness properties were than varied, with the same mass, to extend the range of the fundamental base structure natural frequency. The intention was to have the coupled structural material frequencies in the vicinity of the peak amplitude frequency content of the excitation spectrum. Particular attention was therefore given to the frequency band between 2 Hz and 4 Hz. A horizontal generic floor response spectra is proposed for the top level of a generic structure. Reduction factors are applied to the peak acceleration for equipment at lower levels

  14. Estimation of requirements of eolic energy equivalent to the electric generation of the Laguna Verde nuclear power plant; Estimacion de requerimientos de energia eolica equivalente a la generacion electrica de la Central Nucleoelectrica de Laguna Verde

    Energy Technology Data Exchange (ETDEWEB)

    Garcia V, M.A.; Hernandez M, I.A. [Facultad de Ingenieria, Division de Ingenieria Electrica, UNAM, 04510 Mexico D.F. (Mexico)]. E-mail: maiki27@yahoo.com; Martin del Campo M, C. [Facultad de Ingenieria, Laboratorio de Analisis en Ingenieria de Reactores Nucleares, UNAM, Paseo Cuauhnahuac 8532, 62550 Jiutepec, Morelos (Mexico)

    2004-07-01

    The advantages are presented that have the nuclear and eolic energy as for their low environmental impact and to the human health. An exercise is presented in the one that is supposed that the electric power generated by the Laguna Verde Nuclear Power plant (CNLV), with capacity of 1365 M W, it should be produced by eolic energy when in the years 2020 and 2025 the units 1 and 2 of the CNLV reach its useful life and be moved away. It is calculated the number of aero generators that would produce the electric power average yearly of the CNLV, that which is equal to install eolic parks with capacity of 2758 M W, without considering that it will also be invested in systems of back generation to produce electricity when the aero generators stops for lack of wind. (Author)

  15. Bike-powered electricity generator

    Directory of Open Access Journals (Sweden)

    ŞTEFAN MOCANU

    2015-02-01

    Full Text Available Finding new energy sources is an important challenge of our times. A lot of research focuses on identifying such sources that can also be exploited with relatively simple and efficient systems. These sources can be either new materials that can be used to generate energy, or solutions to scavenge already existing forms of energy. Part of the latter class of solutions, the system presented in this paper converts the energy consumed by many people in gyms (or even at home, during exercise into electric energy. This energy exists anyway, because people want to be healthier or to look better. Currently, this significant (in our opinion amount of energy is actually wasted and transformed into heat. Instead, in this study, a prototype scavenging system (dedicated to fitness/stationary bikes to collect and (reuse this energy is presented. Specifically, we depict the design of a low-budget system that uses existing, discrete components and is able to scavenge some of the energy spent by the biker. The experimental results show that the system is functional, but its efficiency is limited by (mechanical losses before the collection.

  16. Westinghouse AP1000 Electrical Generation Costs - Meeting Marketplace Requirements

    International Nuclear Information System (INIS)

    Paulson, C. Keith

    2002-01-01

    The re-emergence of nuclear power as a leading contender for new base-load electrical generation is not an occurrence of happenstance. The nuclear industry, in general, and Westinghouse, specifically, have worked diligently with the U.S. power companies and other nuclear industry participants around the world to develop future plant designs and project implementation models that address prior problem areas that led to reduced support for nuclear power. In no particular order, the issues that Westinghouse, as an engineering and equipment supply company, focused on were: safety, plant capital costs, construction schedule reductions, plant availability, and electric generation costs. An examination of the above criteria quickly led to the conclusion that as long as safety is not compromised, simplifying plant designs can lead to positive progress of the desired endpoints for the next and later generations of nuclear units. The distinction between next and later generations relates to the readiness of the plant design for construction implementation. In setting requirement priorities, one axiom is inviolate: There is no exception, nor will there be, to the Golden Rule of business. In the electric power generation industry, once safety goals are met, low generation cost is the requirement that rules, without exception. The emphasis in this paper on distinguishing between next and later generation reactors is based on the recognition that many designs have been purposed for future application, but few have been able to attain the design pedigree required to successfully meet the requirements for next generation nuclear units. One fact is evident: Another generation of noncompetitive nuclear plants will cripple the potential for nuclear to take its place as a major contributor to new electrical generation. Only two plant designs effectively meet the economic tests and demonstrate both unparalleled safety and design credibility due to extensive progress toward engineering

  17. Electricity generation with natural gas or with uranium?

    International Nuclear Information System (INIS)

    Villanueva M, C.

    2009-10-01

    The program of works and investments of electric sector that actualize each year the Federal Commission of Electricity, include to the projects of electric power generating stations that will begin its commercial operation inside the horizon of the next ten years, in order to satisfy opportunely with appropriate reservation margins the demand of power and energy in the national interconnected system that grows year to year. In spite of its inherent advantages, in the electric sector prospective 2008-2017 are not considered explicitly to the nuclear power plants, except for the small amplification of capacity of nuclear power plant of Laguna Verde, that already is executing. In this context, the objective of this work is to present and to discuss arguments to favor and against the combined cycle and nuclear technologies, to indicate the risks and disadvantages in that it incurs the electric sector when leaning on so disproportionately on the fossil fuels for the electricity generation, in particular the natural gas, deferring to an indefinite future the installation of nuclear plants whose proven technology is economic, sure, clean and reliable and it contributes decisively to the national energy security. To mitigate the harmful effects of excessive dependence on natural gas to generate electric power, was propose alternatives to the expansion program of electric sector to year 2017, which would have as benefits the decrease of the annual total cost of electric power supply for public service, the significant reduction of natural gas imports and emissions reduction of CO 2 to the atmosphere. (Author)

  18. Gas-fired electric power generating technologies

    International Nuclear Information System (INIS)

    1994-09-01

    The workshop that was held in Madrid 25-27 May 1994 included participation by experts from 16 countries. They represented such diverse fields and disciplines as technology, governmental regulation, economics, and environment. Thus, the participants provided an excellent cross section of key areas and a diversity of viewpoints. At the workshop, a broad range of topics regarding gas-fired electric power generation was discussed. These included political, regulatory and financial issues as well as more specific technical questions regarding the environment, energy efficiency, advanced generation technologies and the status of competitive developments. Important technological advances in gas-based power and CHP technologies have already been achieved including higher energy efficiency and lower emissions, with further improvements expected in the near future. Advanced technology trends include: (a) The use of gas technology to reduce emissions from existing coal-fired power plants. (b) The wide-spread application of combined-cycle gas turbines in new power plants and the growing use of aero-derivative gas turbines in CHP applications. (c) Phosphoric acid fuel cells that are being introduced commercially. Their market penetration will grow over the next 10 years. The next generation of fuel cells (solid oxide and molten carbonate) is expected to enter the market around the year 2000. (EG)

  19. Electric Motor-Generator for a Hybrid Electric Vehicle

    OpenAIRE

    Odvářka, Erik; Mebarki, Abdeslam; Gerada, David; Brown, Neil; Ondrůšek, Čestmír

    2009-01-01

    Several topologies of electrical machines can be used to meet requirements for application in a hybrid electric vehicle. This paper describes process of an electric motor-generator selection, considering electromagnetic, thermal and basic control design. The requested electrical machine must develop 45 kW in continuous operation at 1300 rpm with field weakening capability up to 2500 rpm. Both radial and axial flux topologies are considered as potential candidates. A family of axial flux machi...

  20. Variable structure unit vector control of electric power generation ...

    African Journals Online (AJOL)

    A variable structure Automatic Generation Control (VSAGC) scheme is proposed in this paper for the control of a single area power system model dominated by steam powered electric generating plants. Unlike existing, VSAGC scheme where the selection of the control function is based on a trial and error procedure, the ...

  1. Electric plant cost and power production expenses 1990

    International Nuclear Information System (INIS)

    1992-06-01

    Electric Plant Cost and Power Production Expenses is prepared by the Survey Management Division; Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA); US Department of Energy. This publication presents electric utility statistics on power production expenses and construction costs of electric generating plants. Data presented here are intended to provide information to the electric utility industry, educational institutions, Federal, State, and local governments, and the general public. These data are collected and published to fulfill data collection and dissemination responsibilities of the Energy Information Administration (EIA), as specified in the Federal Energy Administration Act (Public Law 93-275), as amended

  2. Electric plant cost and power production expenses 1991

    International Nuclear Information System (INIS)

    1993-01-01

    Electric Plant Cost and Power Production Expenses is prepared by the Survey Management Division; Office of Coal, Nuclear, Electric and Alternate Fuels (CNEAF); Energy Information Administration (EIA); US Department of Energy. This publication presents electric utility statistics on power production expenses and construction costs of electric generating plants. Data presented here are intended to provide information to the electric utility industry, educational institutions, Federal, State, and local governments, and the general public. These data are collected and published to fulfill data collection and dissemination responsibilities of the Energy Information Administration (EIA), as specified in the Federal Energy Administration Act (Public Law 93-275), as amended

  3. Historical plant cost and annual production expenses for selected electric plants, 1982

    International Nuclear Information System (INIS)

    1984-01-01

    This publication is a composite of the two prior publications, Hydroelectric Plant Construction Cost and Annual Production Expenses and Thermal-Electric Plant Construction Cost and Annual Production Expenses. Beginning in 1979, Thermal-Electric Plant Construction Cost and Annual Production Expenses contained information on both steam-electric and gas-turbine electric plant construction cost and annual production expenses. The summarized historical plant cost described under Historical Plant Cost in this report is the net cumulative-to-date actual outlays or expenditures for land, structures, and equipment to the utility. Historical plant cost is the initial investment in plant (cumulative to the date of initial commercial operation) plus the costs of all additions to the plant, less the value of retirements. Thus, historical plant cost includes expenditures made over several years, as modifications are made to the plant. Power Production Expenses is the reporting year's plant operation and maintenance expenses, including fuel expenses. These expenses do not include annual fixed charges on plant cost (capital costs) such as interest on debt, depreciation or amortization expenses, and taxes. Consequently, total production expenses and the derived unit costs are not the total cost of producing electric power at the various plants. This publication contains data on installed generating capacity, net generation, net capability, historical plant cost, production expenses, fuel consumption, physical and operating plant characteristics, and other relevant statistical information for selected plants

  4. Next generation CANDU plants

    International Nuclear Information System (INIS)

    Hedges, K.R.; Yu, S.K.W.

    1998-01-01

    Future CANDU designs will continue to meet the emerging design and performance requirements expected by the operating utilities. The next generation CANDU products will integrate new technologies into both the product features as well as into the engineering and construction work processes associated with delivering the products. The timely incorporation of advanced design features is the approach adopted for the development of the next generation of CANDU. AECL's current products consist of 700MW Class CANDU 6 and 900 MW Class CANDU 9. Evolutionary improvements are continuing with our CANDU products to enhance their adaptability to meet customers ever increasing need for higher output. Our key product drivers are for improved safety, environmental protection and improved cost effectiveness. Towards these goals we have made excellent progress in Research and Development and our investments are continuing in areas such as fuel channels and passive safety. Our long term focus is utilizing the fuel cycle flexibility of CANDU reactors as part of the long term energy mix

  5. International cost relations in electric power generation

    International Nuclear Information System (INIS)

    Schmitt, D.; Duengen, H.; Wilhelm, M.

    1986-01-01

    In spite of the fact that analyses of the cost of electric power generation as the result of international comparative evaluations are indisputably relevant, problems pending in connection with the costs of representative power plant technologies are of the methodological bind. German authors have hitherto also been failing to clear up and consider all aspects connected with the problems of data acquisition and the adequate interpretation of results. The analysis presented by the paper abstracted therefore aims at the following: 1) Systematization of the different categories of cost relevant in connection with international comparative evaluation. Classification into different categories of decision making and development of standards meeting the requirements of international comparative evaluation. 2) Calculation of relevant average financial costs of Western German, America and French fossil-fuel and nuclear power plants by means of adequate calculation models, that is the assessment of costs with regard to countries and power plant technologies which are relevant to the Federal Republic of Germany. 3) Analysis of the resulting differences and determinantal interpretation. (orig./UA) [de

  6. Installation of electric generators on turbine engines

    Science.gov (United States)

    Demel, H. F.

    1983-01-01

    The installation of generators on turbine aircraft is discussed. Emphasis is placed on the use of the samarium cobalt generator. Potential advantages of an electric secondary power system at the engine level are listed. The integrated generator and the externally mounted generator are discussed. It is concluded that the integrated generator is best used in turbojet and low bypass ratio engines where there is no easy way of placing generators externally without influencing frontal areas.

  7. Next Generation Geothermal Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Brugman, John; Hattar, Mai; Nichols, Kenneth; Esaki, Yuri

    1995-09-01

    A number of current and prospective power plant concepts were investigated to evaluate their potential to serve as the basis of the next generation geothermal power plant (NGGPP). The NGGPP has been envisaged as a power plant that would be more cost competitive (than current geothermal power plants) with fossil fuel power plants, would efficiently use resources and mitigate the risk of reservoir under-performance, and minimize or eliminate emission of pollutants and consumption of surface and ground water. Power plant concepts were analyzed using resource characteristics at ten different geothermal sites located in the western United States. Concepts were developed into viable power plant processes, capital costs were estimated and levelized busbar costs determined. Thus, the study results should be considered as useful indicators of the commercial viability of the various power plants concepts that were investigated. Broadly, the different power plant concepts that were analyzed in this study fall into the following categories: commercial binary and flash plants, advanced binary plants, advanced flash plants, flash/binary hybrid plants, and fossil/geothed hybrid plants. Commercial binary plants were evaluated using commercial isobutane as a working fluid; both air-cooling and water-cooling were considered. Advanced binary concepts included cycles using synchronous turbine-generators, cycles with metastable expansion, and cycles utilizing mixtures as working fluids. Dual flash steam plants were used as the model for the commercial flash cycle. The following advanced flash concepts were examined: dual flash with rotary separator turbine, dual flash with steam reheater, dual flash with hot water turbine, and subatmospheric flash. Both dual flash and binary cycles were combined with other cycles to develop a number of hybrid cycles: dual flash binary bottoming cycle, dual flash backpressure turbine binary cycle, dual flash gas turbine cycle, and binary gas turbine

  8. Pestel study: system comparison of the generation of electric current and heating energy in coupled and uncoupled plants; Pestel Studie: Systemvergleich der Strom- und Heizenergieerzeugung in gekoppelten und ungekoppelten Anlagen

    Energy Technology Data Exchange (ETDEWEB)

    Moeller, K.P.

    1995-12-31

    A system comparison of the generation of electric current and heating energy in coupled and uncoupled plants was carried out in the years 1983/84 at the Eduard Pestel Institute for system research in Hannover. A report is given on the main focus of the investigation which was the comparison of cogeneration power plant for cogeneration with the current generation in modern condensation power plants and the corresponding generation of heating energy in modern gas boilers. The primary energy consumption for generating electric current was compared by means of four examples to the consumption for heating energy generation. The costs of this generation in terms of national economy and industrial management were also compared to each other by means of four examples. (orig.) [Deutsch] Am Eduard Pestel Institut fuer Systemforschung e.V. in Hannover wurde in den Jahren 1983/1984 ein Systemvergleich zwischen der Strom- und Heizenergieerzeugung in gekoppelten und ungekoppelten Anlagen durchgefuehrt. Schwerpunkt der Untersuchung, ueber den heute berichtet werden soll, war der Vergleich von - Blockheizkraftwerken zur gekoppelten Erzeugung mit - einer Stromerzeugung in modernene Kondensationskraftwerken und der entsprechenden Heizwaermeerzeugung in modernen Gaskesseln. Dabei wurden anhand von vier konkreten Fallbeispielen jeweils - die Primaerenergieverbraeuche fuer die Strom- und Heizwaermeerzeugung sowie - die volkswirtschaftlichen und betriebswirtschaftlichen Kosten dieser Erzeugung miteinander verglichen. (orig.)

  9. Scenarios for the hierarchical evaluation of the global sustainability of electric generator plants; Escenarios para la evaluacion jerarquica de la sustentabilidad global de plantas generadoras de electricidad

    Energy Technology Data Exchange (ETDEWEB)

    Roldan A, M.C.; Martinez F, M. [Centro de Investigacion en Energia, UNAM, A.P. 34, 62580 Temixco, Morelos (Mexico)]. e-mail: mcra@cie.unam.mx

    2007-07-01

    The AHP multi criteria method was applied (Analytic Hierarchy Process-Analytic process of Hierarchization) to evaluate the sustainability in the whole life cycle of the electricity generation technologies (hydroelectric, carboelectric, thermoelectric natural fuel oil, natural gas thermoelectric, geothermal, nucleo electric, wind electric, photo thermic and photovoltaic) with the purpose of offering an useful method in the taking of decisions to impel the sustainable development. Eight scenarios are analyzed. The results in most of the scenarios reflect the benefit of the renewable energy: the hydroelectric energy, photo thermic and wind driven its are those more sustainable. To reach the sustainable development in Mexico, the energy politicians should be more near to the use of the renewable energy. (Author)

  10. Comparative assessment of electricity generation options in the Philippines

    International Nuclear Information System (INIS)

    Leonin, T.V.; Mundo, M.Q.; Venida, L.L.; Arriola, H.; Madrio, E.

    2001-01-01

    The development of a country specific data base on energy sources, facilities and technologies is presented in this paper. It also identified feasible national electricity generating options and electric power system expansion alternatives for the period 2000-2020, and conducted comparative assessments of these options based on economic and environmental considerations. The possible role of nuclear power in the country's future electric energy was also studied. The comparison of three electricity generating options were considered: coal-fired thermal power plant without flue gas desulfurization (FGD), coal-fired thermal power plant with FGD and combined cycle power plant with 300 MW generating capacity each. Based on the analysis of three alternatives, the use of coal-fired power plants equipped with flue gas desulfurization (FGD) should be seriously considered. The government is expected to pursue the full development of local energy sources such as hydropower, geothermal, coal, natural gas and other new and renewable energy sources. However, there will still be a major need for imported oil and coal fuel which will likely supply unidentified energy sources beyond 2010. In the case of nuclear power, the government has not firmed up definite plans for any construction of nuclear power plants after 2010. However, the long term energy development plan still includes the operation of at least two nuclear power plants by the 2020 and this long term range program has not been revised in the recent published updates. (Author)

  11. Electricity pricing model in thermal generating stations under deregulation

    International Nuclear Information System (INIS)

    Reji, P.; Ashok, S.; Moideenkutty, K.M.

    2007-01-01

    In regulated public utilities with competitive power markets, deregulation has replaced the monopoly. Under the deregulated power market, the electricity price primarily depends on market mechanism and power demand. In this market, generators generally follow marginal pricing. Each generator fixes the electricity price based on their pricing strategy and it leads to more price volatility. This paper proposed a model to determine the electricity price considering all operational constraints of the plant and economic variables that influenced the price, for a thermal generating station under deregulation. The purpose of the model was to assist existing stations, investors in the power sector, regulatory authorities, transmission utilities, and new power generators in decision-making. The model could accommodate price volatility in the market and was based on performance incentive/penalty considering plant load factor, availability of the plant and peak/ off peak demand. The model was applied as a case study to a typical thermal utility in India to determine the electricity price. It was concluded that the case study of a thermal generating station in a deregulated environment showed that the electricity price mainly depended on the gross calorific value (GCV) of fuel, mode of operation, price of the fuel, and operating charges. 11 refs., 2 tabs., 1 fig

  12. Stationary diesel engines for use with generators to supply electric power

    Science.gov (United States)

    1977-01-01

    The procurement of stationary diesel engines for on-site generation of electric power deals with technical criteria and policy relating to federal agency, not electrical components of diesel-generator sets or for the design of electric-power generating plants or their air-pollution or noise control equipment.

  13. More on duel purpose solar-electric power plants

    Science.gov (United States)

    Hall, F. F.

    Rationale for such plants is reviewed and plant elements are listed. Dual purpose solar-electric plants would generate both electricity and hydrogen gas for conversion to ammonia or methanol or direct use as a fuel of unsurpassed specific power and cleanliness. By-product oxygen would also be sold to owners of hydrogen age equipment. Evolved gasses at high pressure could be fired in compressorless gas turbines, boilerless steam-turbines or fuel-cell-inverter hydrogen-electric power drives of high thermal efficiency as well as in conventional internal combustion engines.

  14. Nuclear Power as an Option in Electrical Generation Planning for Small Economy and Electricity Grid

    International Nuclear Information System (INIS)

    Tomsic, Z.

    2012-01-01

    Implementing a NPP in countries with relatively small total GDP (small economy) and usually with small electricity grid face two major problems and constrains: the ability to obtain the considerable financial resources required on reasonable terms and to connect large NPP to small electricity grid. Nuclear generation financing in developing countries involves complex issues that need to be fully understood and dealt with by all the parties involved. The main topics covered by paper will be the: special circumstances related to the financing of NPP, costs and economic feasibility of NPP, conventional approaches for financing power generation projects in developing countries, alternative approaches for mobilizing financial resources. The safe and economic operation of a nuclear power plant (NPP) requires the plant to be connected to an electrical grid system that has adequate capacity for exporting the power from the NPP, and for providing a reliable electrical supply to the NPP for safe start-up, operation and normal or emergency shut-down of the plant. Connection of any large new power plant to the electrical grid system in a country may require significant modification and strengthening of the grid system, but for NPPs there may be added requirements to the structure of the grid system and the way it is controlled and maintained to ensure adequate reliability. Paper shows the comparative assesment of differrent base load technologies as an option in electrical generation planning for small economy and electricity grid.(author).

  15. Green power perspectives on sustainable electricity generation

    CERN Document Server

    Neiva de Figueiredo, Joao

    2014-01-01

    Green Power: Perspectives on Sustainable Electricity Generation; João Neiva de Figueiredo and Mauro GuillénAn Overview of Electricity Generation Sources; Akhil Jariwala and Saumil JariwalaGermany's Energy Revolution; José Carlos Thomaz, Jr. and Sean MichalsonChina's Energy Profile and the Importance of Coal; Julia Zheng and Xiaoting ZhengChina's Search for Cleaner Electricity Generation Alternatives; Julia Zheng and Xiaoting ZhengRenewable Energy in Spain: A Quest for Energy Security; José Normando Bezerra, Jr.Renewable Energy in French Polynesia: From Unpredictable to Energy Independence? Dia

  16. Revenue opportunities for gas plants arising from electricity deregulation

    International Nuclear Information System (INIS)

    Bachmann, G.C.

    1999-01-01

    A brief overview of deregulation in the electric power industry and an explanation of how these changes can be used to increase revenues of gas processing plants is provided. Deregulation in the electric power industry provides the potential to significantly reduce energy costs for the gas plant and allows technology to be applied to make a better use of a valuable commodity. Owners and operators of gas processing plants increase their operating income by taking advantage of co-generation systems which provide heat and electrical energy to the gas plant. Such an application has three revenue streams, the main one being the power sales to the gas plant, the second one heat sales, and the third increased revenues from the gas plant through a reduction of overall costs, not to mention significantly reduced downtime. Further savings are possible through diversion of excess energy produced to other facilities owned by the gas plant owner

  17. Using sewerage system to generate electricity

    International Nuclear Information System (INIS)

    Asghar, J.

    2005-01-01

    The development of the sanitary engineering has paralleled and contributed to the growth of the city. Without an adequate supply of safe water, the great city could not exist and life in it would be both unpleasant and dangerous unless human and other waste were promptly removed. The concentration of population in relatively small areas has made the task of sanitary engineer more complex. The cities, towns and villages are being polluted ground water and surface water. Industries also demand more and better water from all available sources. The rivers receive ever-increasing amount of sewage and industrial wastes and thus resulting more attention to the water treatment, stream pollution and complicated phenomena of self-purification. In many developing countries there is no such treatment plants for the sewerage water. Rivers receive large amount of polluted water and resulting many diseases. Thus self-purification and treatment plants playa vital role in sanitation. The other benefit is now introducing as Generating electricity from Sewerage System. (author)

  18. Formation of electrical islands conformed by a generator, a part from an electrical distributor and industrial plants; Formacion de islas electricas conformadas por un generador, parte de una distribuidora electrica y plantas industriales

    Energy Technology Data Exchange (ETDEWEB)

    Aguero, J.L.; Beroqui, M.; Barbieri, B. [Universidad Nacional de La Plata, Buenos Aires (Argentina). Facultad de Ingenieria. Instituto de Investigaciones Tecnologicas para Redes y Equipos Electricos

    2001-07-01

    The goal of this paper is to describe, through an example, the aspects of importance to be taken into consideration for a successful electric island formation in cases that have an important generation excess with respect to the demand, and in cases that result in a balanced condition.This paper is based on the accomplished investigations due to the need of a petrochemistry industry of increasing the reliability of its electric power provision.

  19. Optimization Methodologies of Mixed Electrical Generators in ...

    African Journals Online (AJOL)

    This article deals of the optimization of renewable energy electric generators, for the alimentation of radio telecommunication systems. The principals' interests of this system are the independence production, and the supplying of electric energy in isolated localities. Have at one's the energetic and economic models, and ...

  20. French nuclear power plants for heat generation

    International Nuclear Information System (INIS)

    Girard, Y.

    1984-01-01

    The considerable importance that France attributes to nuclear energy is well known even though as a result of the economic crisis and the energy savings it is possible to observe a certain downward trend in the rate at which new power plants are being started up. In July 1983, a symbolic turning-point was reached - at more than 10 thousand million kW.h nuclear power accounted, for the first time, for more than 50% of the total amount of electricity generated, or approx. 80% of the total electricity output of thermal origin. On the other hand, the direct contribution - excluding the use of electricity - of nuclear energy to the heat market in France remains virtually nil. The first part of this paper discusses the prospects and realities of the application, at low and intermediate temperatures, of nuclear heat in France, while the second part describes the French nuclear projects best suited to the heat market (excluding high temperatures). (author)

  1. Electricity market opening and electricity generation system's expansion in Slovenia

    International Nuclear Information System (INIS)

    Kosnjek, Z.; Vidmar, M.; Bregar, Z.

    2000-01-01

    Slovenia is rapidly adopting the European Union (EU) legislation to make itself ready to be admitted the fifteen EU member countries. In the area of energy or electricity supply industry, Slovenia has consequently enforced the Energy law, which in its essence follows the idea of the Directive 96/92/EC. Globally, the Directive defines common rules of the internal electricity market within EU. Any EU member country is responsible for assuring a competitive electricity market and implementing corresponding instruments as foreseen by the Directive. The share of the national market opening is calculated on the basis of eligible customers' consumption versus the overall consumption in a particular member country. Also, the Directive defines the rate of the electricity market opening. It is interesting to note that the EU member countries have been opening their national electricity markets at a greater speed than specified by the Directive. The overall Slovenian Electricity Supply Industry shall have to adapt itself to new imperatives, whereby the greatest changes will by all means take place in the area of electricity generation. As the reaction of eligible domestic market customers is quite unpredictable, the direct electricity import from foreign countries can only be estimated on a variant basis. EU countries that have deregulated their electricity market have been, step by step, gaining valuable experiences. The majority of them show a considerable pressure on having prices of the EPS generation sector reduced. A similar development can by all means be expected in Slovenia, too. it is expected that the major burden of the electricity market liberalisation and electric power interconnecting within EU will be carried by the EPS generation sector. The analyses of developed variants show that the burden, imposed by the transition onto the market economy, will be predominantly carried by the coal fired electricity supply industry. Further development of electricity

  2. Electricity prices and generator behaviour in gross pool electricity markets

    International Nuclear Information System (INIS)

    O'Mahoney, Amy; Denny, Eleanor

    2013-01-01

    Electricity market liberalisation has become common practice internationally. The justification for this process has been to enhance competition in a market traditionally characterised by statutory monopolies in an attempt to reduce costs to end-users. This paper endeavours to see whether a pool market achieves this goal of increasing competition and reducing electricity prices. Here the electricity market is set up as a sealed bid second price auction. Theory predicts that such markets should result with firms bidding their marginal cost, thereby resulting in an efficient outcome and lower costs to consumers. The Irish electricity system with a gross pool market experiences among the highest electricity prices in Europe. Thus, we analyse the Irish pool system econometrically in order to test if the high electricity prices seen there are due to participants bidding outside of market rules or out of line with theory. Overall we do not find any evidence that the interaction between generator and the pool in the Irish electricity market is not efficient. Thus, the pool element of the market structure does not explain the high electricity prices experienced in Ireland. - Highlights: • We consider whether a gross pool achieves competitive behaviour. • We analyse the Irish pool system econometrically. • Results indicate the Irish pool system appears to work efficiently. • Generators appear to be bidding appropriately

  3. Scenarios of Expansion to Electric Generation Capacity

    Directory of Open Access Journals (Sweden)

    José Somoza-Cabrera

    2017-06-01

    Full Text Available We show the building scenarios of expansion to electric generation capacity enough to supply the demand to 2050. We were using the LEAP facility (Long-range Energy Alternatives Planning System, to simulate dispatch of electricity at minimum cost. Finally, we show the cost-benefice analysis of the technologies availability, included externality and CO2 emission limited. However that we included the externals cost in this analysis, it results insufficient to closed gap between fossil and renewable technologies of electric generation. Nevertheless, in some opportunities the renewable options had very important participations in the minimal cost scenario of expansion.

  4. Electric Field Generation in Martian Dust Devils

    Science.gov (United States)

    Barth, Erika L.; Farrell, William M.; Rafkin, Scot C. R.

    2015-01-01

    Terrestrial dust devils are known to generate electric fields from the vertical separation of charged dust particles. The particles present within the dust devils on Mars may also be subject to similar charging processes and so likely contribute to electric field generation there as well. However, to date, no Marsin situ instrumentation has been deployed to measure electric field strength. In order to explore the electric environment of dust devils on Mars, the triboelectric dust charging physics from the MacroscopicTriboelectric Simulation (MTS) code has been coupled to the Mars Regional Atmospheric ModelingSystem (MRAMS). Using this model, we examine how macroscopic electric fields are generated within martian dust disturbances and attempt to quantify the time evolution of the electrodynamical system.Electric fields peak for several minutes within the dust devil simulations. The magnitude of the electric field is a strong function of the size of the particles present, the average charge on the particles and the number of particles lifted. Varying these parameters results in peak electric fields between tens of millivolts per meter and tens of kilovolts per meter.

  5. Cost and quality of fuels for electric utility plants 1991

    International Nuclear Information System (INIS)

    1992-01-01

    Data for 1991 and 1990 receipts and costs for fossil fuels discussed in the Executive Summary are displayed in Tables ES1 through ES7. These data are for electric generating plants with a total steam-electric and combined-cycle nameplate capacity of 50 or more megawatts. Data presented in the Executive Summary on generation, consumption, and stocks of fossil fuels at electric utilities are based on data collected on the Energy Information Administration, Form EIA-759, ''Monthly Power Plant Report.'' These data cover all electric generating plants. The average delivered cost of coal, petroleum, and gas each decreased in 1991 from 1990 levels. Overall, the average annual cost of fossil fuels delivered to electric utilities in 1991 was $1.60 per million Btu, a decrease of $0.09 per million Btu from 1990. This was the lowest average annual cost since 1978 and was the result of the abundant supply of coal, petroleum, and gas available to electric utilities. US net generation of electricity by all electric utilities in 1991 increased by less than I percent--the smallest increase since the decline that occurred in 1982.3 Coal and gas-fired steam net generation, each, decreased by less than I percent and petroleum-fired steam net generation by nearly 5 percent. Nuclear-powered net generation, however, increased by 6 percent. Fossil fuels accounted for 68 percent of all generation; nuclear, 22 percent; and hydroelectric, 10 percent. Sales of electricity to ultimate consumers in 1991 were 2 percent higher than during 1990

  6. Next Generation Nuclear Plant Project Evaluation of Siting a HTGR Co-generation Plant on an Operating Commercial Nuclear Power Plant Site

    International Nuclear Information System (INIS)

    Demick, L.E.

    2011-01-01

    This paper summarizes an evaluation by the Idaho National Laboratory (INL) Next Generation Nuclear Plant (NGNP) Project of siting a High Temperature Gas-cooled Reactor (HTGR) plant on an existing nuclear plant site that is located in an area of significant industrial activity. This is a co-generation application in which the HTGR Plant will be supplying steam and electricity to one or more of the nearby industrial plants.

  7. Next Generation Nuclear Plant Project Evaluation of Siting a HTGR Co-generation Plant on an Operating Commercial Nuclear Power Plant Site

    Energy Technology Data Exchange (ETDEWEB)

    L.E. Demick

    2011-10-01

    This paper summarizes an evaluation by the Idaho National Laboratory (INL) Next Generation Nuclear Plant (NGNP) Project of siting a High Temperature Gas-cooled Reactor (HTGR) plant on an existing nuclear plant site that is located in an area of significant industrial activity. This is a co-generation application in which the HTGR Plant will be supplying steam and electricity to one or more of the nearby industrial plants.

  8. Bike-powered electricity generator

    OpenAIRE

    ŞTEFAN MOCANU; ADRIAN UNGUREANU; RADU VARBANESCU

    2015-01-01

    Finding new energy sources is an important challenge of our times. A lot of research focuses on identifying such sources that can also be exploited with relatively simple and efficient systems. These sources can be either new materials that can be used to generate energy, or solutions to scavenge already existing forms of energy. Part of the latter class of solutions, the system presented in this paper converts the energy consumed by many people in gyms (or even at home, during ...

  9. Investments in electricity generation in Croatian liberalized market: energy option

    International Nuclear Information System (INIS)

    Androcec, I.; Viskovic, A.; Slipac, G.

    2004-01-01

    The Republic of Croatia should have enough capacities built on its own territory to cover system's peak load at any time for ensuring a long-term reliability of its operation. According to annual increasing of electricity consumption and progressive shutdown of the oldest generating plants, the security of future electricity supply depends on new investments. The market, i.e. a competitive generation, is the driving force in the construction of new power plants. The main stimulus for the construction is the possibility of definite return of invested capital and enabling potential investors to realize the expected revenues (profit). The construction of generating capacities is subject of authorisation procedure or tendering procedure, by approval of the Energy Regulatory Council. The electricity market opening in Croatia is parallel process with establishment of regional energy market in South East Europe where the decision of investment in new power plant will be defined by regional investment priorities, all in the aspect of European Union enlargement. In those liberalisation conditions it is necessary to realize all possible energy options according to the Strategy of Energy Development of Republic of Croatia and to the regional energy market requirements or European Union Directives. New power plant will be realized, because of objective circumstances, through construction of gas power plant or coal power plant and possible nuclear power plant, and in much smaller size through construction of hydro power plants or power plants on renewable energy sources. The possibility of any energy option will be considered in view of: investment cost, operation and maintenance cost, fuel price, external costs, public influence, and through investor's risk. This paper is aiming to analyse the possibility of nuclear power plant construction in Croatia as well as in other small and medium electricity grids. Nuclear option will be comprehensively considered in technical

  10. Developments in fossil fuel electricity generation

    International Nuclear Information System (INIS)

    Williams, A.; Argiri, M.

    1993-01-01

    A major part of the world's electricity is generated by the combustion of fossil fuels, and there is a significant environmental impact due to the production of fossil fuels and their combustion. Coal is responsible for 63% of the electricity generated from fossil fuels; natural gas accounts for about 20% and fuel oils for 17%. Because of developments in supply and improvements in generating efficiencies there is apparently a considerable shift towards a greater use of natural gas, and by the year 2000 it could provide 25% of the world electricity output. At the same time the amount of fuel oil burned will have decreased. The means to minimize the environmental impact of the use of fossil fuels, particularly coal, in electricity production are considered, together with the methods of emission control. Cleaner coal technologies, which include fluidized bed combustion and an integrated gasification combined cycle (IGCC), can reduce the emissions of NO x , SO 2 and CO 2 . (author)

  11. Thermo-electrical systems for the generation of electricity

    International Nuclear Information System (INIS)

    Bitschi, A.; Froehlich, K.

    2010-01-01

    This article takes a look at theoretical models concerning thermo-electrical systems for the generation of electricity and demonstrations of technology actually realised. The potentials available and developments are discussed. The efficient use of energy along the whole generation and supply chain, as well as the use of renewable energy sources are considered as being two decisive factors in the attainment of a sustainable energy supply system. The large amount of unused waste heat available today in energy generation, industrial processes, transport systems and public buildings is commented on. Thermo-electric conversion systems are discussed and work being done on the subject at the Swiss Federal Institute of Technology in Zurich is discussed. The findings are discussed and results are presented in graphical form

  12. A large electrically excited synchronous generator

    DEFF Research Database (Denmark)

    2014-01-01

    This invention relates to a large electrically excited synchronous generator (100), comprising a stator (101), and a rotor or rotor coreback (102) comprising an excitation coil (103) generating a magnetic field during use, wherein the rotor or rotor coreback (102) further comprises a plurality...... adjacent neighbouring poles. In this way, a large electrically excited synchronous generator (EESG) is provided that readily enables a relatively large number of poles, compared to a traditional EESG, since the excitation coil in this design provides MMF for all the poles, whereas in a traditional EESG...

  13. The Estimation of Externalities Resulting from the Electricity Generation

    Energy Technology Data Exchange (ETDEWEB)

    Jeong, Jong Tae; Ha, Jae Joo

    2003-03-15

    The methodology, program, and the representative results for the estimation of externalities was reviewed. The review of them are based on the ExternE Project which is a representative research project for the estimation of externalities resulting from the various energy generating systems. The results for the study will be used as basic data for the comparative study on the integrated risk estimation for various energy generating systems including nuclear power plants. Also, these results will be used as comparative data in the establishment of a integrated comparative risk assessment tool and in the comparative study of the impacts resulting from the various electricity generating systems. These studies make it possible to compare the environmental impacts of nuclear power generation and other electricity generation systems. Therefore, this will of use in the enhancement of public acceptance of nuclear power generation.

  14. The Estimation of Externalities Resulting from the Electricity Generation

    International Nuclear Information System (INIS)

    Jeong, Jong Tae; Ha, Jae Joo

    2003-03-01

    The methodology, program, and the representative results for the estimation of externalities was reviewed. The review of them are based on the ExternE Project which is a representative research project for the estimation of externalities resulting from the various energy generating systems. The results for the study will be used as basic data for the comparative study on the integrated risk estimation for various energy generating systems including nuclear power plants. Also, these results will be used as comparative data in the establishment of a integrated comparative risk assessment tool and in the comparative study of the impacts resulting from the various electricity generating systems. These studies make it possible to compare the environmental impacts of nuclear power generation and other electricity generation systems. Therefore, this will of use in the enhancement of public acceptance of nuclear power generation

  15. Small solar thermal electric power plants with early commercial potential

    Science.gov (United States)

    Jones, H. E.; Bisantz, D. J.; Clayton, R. N.; Heiges, H. H.; Ku, A. C.

    1979-01-01

    Cost-effective small solar thermal electric power plants (1- to 10-MW nominal size) offer an attractive way of helping the world meet its future energy needs. The paper describes the characteristics of a conceptual near-term plant (about 1 MW) and a potential 1990 commercial version. The basic system concept is one in which steam is generated using two-axis tracking, parabolic dish, and point-focusing collectors. The steam is transported through low-loss piping to a central steam turbine generator unit where it is converted to electricity. The plants have no energy storage and their output power level varies with the solar insolation level. This system concept, which is firmly based on state-of-the-art technology, is projected to offer one of the fastest paths for U.S. commercialization of solar thermal electric power plants through moderate technology advances and mass production.

  16. Quality of coal - base for optimal electric power generation

    International Nuclear Information System (INIS)

    Jankov, Jovan

    1997-01-01

    Bitola Mines Plant and Energy Combine is the largest electric power producer in the Republic of Macedonia. It is established on two separately production units: coal (lignite) open pit mine 'Suvodol' and the power plants 'Bitola'. The lignite from the mine is used only for electric power generation in the thermal power plants. The coal quality is the first, basic point in the production line, while the electric power, transformed to the high tension transmission system is the last , final production point. Between the two points, there are all equipment, production units, materials and very hard work to get optimal and economical solutions as well as production. This material gives a short explanation between that two points. (Author)

  17. Electricity: From Tabletop to Power Plant

    Science.gov (United States)

    Moran, Timothy

    2009-01-01

    While electricity is central to our daily lives, it remains "black box" technology to most students. They know that electricity is produced somewhere and that it costs money, but they do not have personal experience with the operation and scale of the machines that provide it. Fortunately, electricity generation can be added to the more basic…

  18. Electric power generation the changing dimensions

    CERN Document Server

    Tagare, D M

    2011-01-01

    "This book offers an analytical overview of established electric generation processes, along with the present status & improvements for meeting the strains of reconstruction. These old methods are hydro-electric, thermal & nuclear power production. The book covers climatic constraints; their affects and how they are shaping thermal production. The book also covers the main renewable energy sources, wind and PV cells and the hybrids arising out of these. It covers distributed generation which already has a large presence is now being joined by wind & PV energies. It covers their accommodation in the present system. It introduces energy stores for electricity; when they burst upon the scene in full strength are expected to revolutionize electricity production. In all the subjects covered, there are references to power marketing & how it is shaping production. There will also be a reference chapter on how the power market works"--Provided by publisher.

  19. Agent Based Control of Electric Power Systems with Distributed Generation

    DEFF Research Database (Denmark)

    Saleem, Arshad

    . This thesis focuses on making a systematic evaluation of using intelligent software agent technology for control of electric power systems with high penetration of distributed generation. The thesis is based upon a requirement driven approach. It starts with investigating new trends and challenges in Electric......Distributed generation, decentralized and local control, self organization and autonomy are evident trends of today's electric power systems focusing on innovative control architectures such as MicroGrids, Virtual Power Plants, Cell based systems, plug-in electric vehicles and real time markets...... agents. It suggests a multiagent based exible control architecture (subgrid control) suitable for the implementation of the innovative control concepts. This subgrid control architecture is tested on a novel distributed software platform which has been developed to design, test and evaluate distributed...

  20. Resolution 519/012. It is allowed to R DEL SUR S.A company to generate a wind electricity source by a generating power plant placed in Maldonado province 2nd and 4th Catastral section, as well as the connection to the Interconnected National System

    International Nuclear Information System (INIS)

    2012-01-01

    The Resolution 519 is according to the Electric Wholesale Market regulation and it authorizes the power generation using the wind as the primary source. The company who presented this project was R DEL SUR S.A with the aim to instal a wind power plant in Maldonado province.

  1. Electricity trade: Generating benefits for British Columbians

    International Nuclear Information System (INIS)

    1994-01-01

    Electricity has been traded in British Columbia since the turn of the century. In 1988, the provincial government established the British Columbia Power Exchange Corporation (Powerex) to conduct electricity trade activities in order to make the most efficient use of the electrial system and generate benefits for British Columbians. The trade is made possible by an interconnected system linking producers and consumers in western Canada and the USA. Provincial participants in the trade include British Columbia Hydro, independent power producers, and cogenerators. Benefits of the electricity trade include generation of revenue from sale of surplus power, being able to buy electricity when the mainly hydroelectric provincial system is in a drought condition or when major shutdowns occur, and enabling postponement of development of new power projects. Powerex conducts its trade under provincial and federal permits and licenses. Different types of trade contracts are negotiated depending on the amount and availability of electricity and the kind of trade being conducted. Exchanges and coordination agreements allow transfer and return between utilities with no net export occurring, allowing balancing of loads between different reigons. Surplus electricity is bought or sold on a short- or long-term basis and on firm or non-firm terms. Electricity exports are not subsidized and are only allowed if the electricity is surplus to provincial needs and can be sold at a profit. A new provincial policy allows private industry to export long-term firm electricity; this involves construction of new private-sector generating facilities solely for the purpose of export. 1 fig

  2. Electric distribution systems and embedded generation capacity

    International Nuclear Information System (INIS)

    Calderaro, V.; Galdi, V.; Piccolo, A.; Siano, P.

    2006-01-01

    The main policy issues of European States are sustainable energy supply promotion and liberalization of energy markets, which introduced market competition in electricity production and created support mechanisms to encourage renewable electricity production and consumption. As a result of liberalization, any generator, including small-scale and renewable energy based units, can sell electricity on the free market. In order to meet future sustainability targets, connection of a higher number of Distributed Generation (DG) units to the electrical power system is expected, requiring changes in the design and operation of distribution electricity systems, as well as changes in electricity network regulation. In order to assist distribution system operators in planning and managing DG connections and in maximizing DG penetration and renewable sources exploitation, this paper proposed a reconfiguration methodology based on a Genetic Algorithm (GA), that was tested on a 70-bus system with DG units. The simulation results confirmed that the methodology represents a suitable tool for distribution system operators when dealing with DG capacity expansion and power loss issues, providing information regarding the potential penetration network-wide and allowing maximum exploitation of renewable generation. 35 refs., 4 tabs., 6 figs

  3. Generating Electricity from Water through Carbon Nanomaterials.

    Science.gov (United States)

    Xu, Yifan; Chen, Peining; Peng, Huisheng

    2018-01-09

    Over the past ten years, electricity generation from water in carbon-based materials has aroused increasing interest. Water-induced mechanical-to-electrical conversion has been discovered in carbon nanomaterials, including carbon nanotubes and graphene, through the interaction with flowing water as well as moisture. In this Concept article, we focus on the basic principles of electric energy harvesting from flowing water through carbon nanomaterials, and summarize the material modification and structural design of these nanogenerators. The current challenges and potential applications of power conversion with carbon nanomaterials are finally highlighted. © 2018 Wiley-VCH Verlag GmbH & Co. KGaA, Weinheim.

  4. Feasibility report for the installation and operation of an electrical power generating plant on the Islands of Zanzibar and Pemba, Tanzania. Export trade information

    Energy Technology Data Exchange (ETDEWEB)

    Patel, M.C.

    1994-04-04

    The study, conducted by S & Davis International, was funded by the U.S. Trade and Development Agency on behalf of Tanzania`s Ministry of Water, Construction, Energy, Land, and Environment. The report reviews and evaluates the existing power source and support stations for the current and future reliability of providing power to the islands of Zanzibar and Pemba as well as the feasibility of obtaining an independent power source. The study also covers the cost of power generation and rate structures, including the execution schedule and budgetary costs. The report contains the Introduction and Executive Summary and is divided into the following chapters: (1) General Information; (2) Power Supply Assessment; (3) Estimate of Power Usage; (4) Recommended Power Plant Configuration; (5) Technical Data on Generators; (6) The Economics.

  5. Power plant investment cycles in liberalised markets. A model of the German electricity generation market; Zyklen bei Kraftwerksinvestitionen in liberalisierten Maerkten. Ein Modell des deutschen Stromerzeugungsmarktes

    Energy Technology Data Exchange (ETDEWEB)

    Gaidosch, Lars

    2008-07-01

    In the course of the next ten to fifteen years almost half of Germany's installed power plant capacity will need to be replaced by the construction of new facilities. The power plant investments required for this will be made in an environment marked by liberalisation and competition. This is the context of the present article, which analyses the causes behind the cyclical behaviour of power plant investment and identifies factors that influence it. Cycles in this connection are defined as recurring oscillations in power plant capacity and electricity prices. The authors also propose measures that could dampen the cyclical course of power plant investment over time. One of the major outcomes of the present model calculations is that the power production market, similarly to other capital-intensive branches of industry, is expected to experience strong price fluctuations in the future as well. As it has been framed up to now, the German electricity wholesale market will not be able to prevent the occurrence investment cycles in power plant construction. One way to counteract investment cycles would be to greatly expand the time horizon of the liquid spot market through greater activity on the part of trading firms. [German] In den naechsten 10 bis 15 Jahren sind in Deutschland und Europa sowie weltweit knapp die Haelfte der installierten Kraftwerksleistung zu ersetzen bzw. neu zu errichten. Die hierfuer erforderlichen Kraftwerksinvestitionen finden heute unter den veraenderten Rahmenbedingungen der Liberalisierung und des Wettbewerbs statt. In diesem Zusammenhang werden Ursachen von Zyklen bei Kraftwerksinvestitionen analysiert und deren Einflussfaktoren aufgezeigt. Zyklen werden als wiederkehrende Schwankungen der Kraftwerkskapazitaeten und Strompreise definiert. Zusaetzlich werden Massnahmen vorgeschlagen, die eine Zyklenbildung bei Kraftwerksinvestitionen abschwaechen koennen. Zunaechst erfolgt eine Untersuchung unter welchen Bedingungen

  6. Regional projections of nuclear and fossil electric power generation costs

    International Nuclear Information System (INIS)

    Smolen, G.R.; Delene, J.G.; Fuller, L.C.; Bowers, H.I.

    1983-12-01

    The total busbar electric generating costs were estimated for locations in ten regions of the United States for base load nuclear and coal-fired power plants with a startup date of January 1995. A complete data set is supplied which specifies each parameter used to obtain the comparative results. When the comparison is based on reference cost parameters, nuclear- and coal-fired generation costs are found to be very close in most regions of the country. Nuclear power is favored in the South Atlantic region where coal must be transported over long distances, while coal-fired generation is favored in the Central and North Central regions where large reserves of cheaply mineable coal exist. The reference data set reflects recent electric utility construction experience. Significantly lower nuclear capital investment costs would result if regulatory reform and improved construction practices were instituted. The electric power generation costs for base load oil- and natural gas-fired plants were also estimated. These plants were found to be noncompetitive in all regions for those scenarios most likely to develop. Generation cost sensitivity to changes in various parameters was examined at a reference location. The sensitivity parameters included capital investment costs, lead times, capacity factors, costs of money, and coal and uranium prices. In addition to the levelized lifetime costs, year-by-year cash flows and revenue requirements are presented. The report concludes with an analysis of the economic merits of recycling spent fuel in light-water reactors

  7. Merits of excess bagasse as fuel for generating electricity. [Florida

    Energy Technology Data Exchange (ETDEWEB)

    Perea, P.

    1981-05-01

    The rising cost of fuel oil improves the economics for sugar factories of using excess bagasse to produce more electricity than they require for sale to the public utility companies. Recently, the United States Sugar Corporation, in Florida, initiated the operation of a 20 MW plant fueled with excess bagasse only, and the electricity it generates is sold to a local utility. This constitutes a saving of 10 million liters of oil per year. The operating cycle is described of a system of high-pressure boilers and automatically controlled turbogenerator for the production of energy from bagasse. This system is a pre-engineered design which is very simple to install and operate and can be fitted in with the electric-generating installations which are normally found in practically any sugar factory without making significant modifications to the factory. An economic analysis is presented of power generation using excess bagasse for a 3MW unit and a 4MW unit.

  8. Design of very high speed electric generators

    International Nuclear Information System (INIS)

    Labollita, Santiago

    2008-01-01

    This work approaches the design process of an electric generator suitable for running efficiently at high speed, driven by a turbo shaft.The axial flux concept was used.For the mechanical design of the prototype, cooling capacity and mounting method were considered, looking for simplicity of the parts evolved. Neodymium-iron-boron permanent magnets were used as magnetic source.For the electrical design, a calculation tool was developed in order to predict the prototype electrical parameters and optimize its geometry.The goal was to obtain 1 kW of electric power at a speed of 100,000 rpm.The efficiency and electrical behaviour of the prototype were characterized at speeds between 2,000 rpm and 30,000 rpm and then the behaviour at the design condition was predicted by obtaining an equivalent electric circuit.The estimated load voltage was 237 V as well as an electrical efficiency of 95%.Eddy current effects were not recognized. Increase of the internal resistance and decree of inductance were observed while raising the electric frequency.Finally, an electronic system was developed in order to use the prototype as a c.c. motor. Global performance was measured according to different supply characteristic. An optimum supply voltage was found.A maximum efficiency of 63% was reached. [es

  9. Total generating costs: coal and nuclear plants

    International Nuclear Information System (INIS)

    1979-02-01

    The study was confined to single and multi-unit coal- and nuclear-fueled electric-generating stations. The stations are composed of 1200-MWe PWRs; 1200-MWe BWRs; 800-and 1200-MWe High-Sulfur Coal units, and 800- and 1200-MWe Low-Sulfur Coal units. The total generating cost estimates were developed for commercial operation dates of 1985 and 1990; for 5 and 8% escalation rates, for 10 and 12% discount rates; and, for capacity factors of 50, 60, 70, and 80%. The report describes the methodology for obtaining annualized capital costs, levelized coal and nuclear fuel costs, levelized operation and maintenance costs, and the resulting total generating costs for each type of station. The costs are applicable to a hypothetical Middletwon site in the Northeastern United States. Plant descriptions with general design parameters are included. The report also reprints for convenience, summaries of capital cost by account type developed in the previous commercial electric-power cost studies. Appropriate references are given for additional detailed information. Sufficient detail is given to allow the reader to develop total generating costs for other cases or conditions

  10. Power generation investment in electricity markets

    International Nuclear Information System (INIS)

    2003-01-01

    Most IEA countries are liberalizing their electricity markets, shifting the responsibility for financing new investment in power generation to private investors. No longer able to automatically pass on costs to consumers, and with future prices of electricity uncertain, investors face a much riskier environment for investment in electricity infrastructure. This report looks at how investors have responded to the need to internalize investment risk in power generation. While capital and total costs remain the parameters shaping investment choices, the value of technologies which can be installed quickly and operated flexibly is increasingly appreciated. Investors are also managing risk by greater use of contracting, by acquiring retail businesses, and through mergers with natural gas suppliers. While liberalization was supposed to limit government intervention in the electricity market, volatile electricity prices have put pressure on governments to intervene and limit such prices. This study looks at several cases of volatile prices in IEA countries' electricity markets, and finds that while market prices can be a sufficient incentive for new investment in peak capacity, government intervention into the market to limit prices may undermine such investment

  11. Competitive electricity markets, prices and generator entry and exit

    Science.gov (United States)

    Ethier, Robert George

    The electric power industry in the United States is quickly being deregulated and restructured. In the past, new electric generation capacity was added by regulated utilities to meet forecasted demand levels and maintain reserve margins. With competitive wholesale generation, investment will be the responsibility of independent private investors. Electricity prices will assume the coordinating function which has until recently been the responsibility of regulatory agencies. Competitive prices will provide the entry and exit signals for generators in the future. Competitive electricity markets have a distinctive price formation process, and thus require a specialized price model. A mean-reverting price process with stochastic jumps is proposed as an appropriate long-run price process for annual electricity prices. This price process is used to develop an analytic real options model for private investment decisions. The required recursive infinite series solutions have not been widely used for real option models. Entry thresholds and asset values for competitive wholesale electricity markets, and exit decisions for plants with significant retirement costs (i.e. nuclear power plants), are examined. The proposed model results in significantly lower trigger prices for both entry and exit decisions, and higher asset values, when compared with other standard models. The model is used to show that the incentives for retiring a nuclear plant are very sensitive to the treatment of decommissioning costs (e.g. if plant owners do not face full decommissioning costs, retirement decisions may be economically premature.) An econometric model of short-run price behavior is estimated by the method of maximum likelihood using daily electricity prices from markets in the USA and Australia. The model specifies two mean reverting price processes with stochastic Markov switching between the regimes, which allows discontinuous jumps in electricity prices. Econometric tests show that a two

  12. Electricity generation: a case study in Turkey

    International Nuclear Information System (INIS)

    Kaygusuz, K.

    1999-01-01

    Large-scale electricity generation provides versatile energy of the highest quality. Today, fossil fuels such as coal, oil, and natural gas are the primary sources of this energy. However, these fossil energy sources are limited and using fossil energy sources has the undesirable effect of releasing emissions that burden the environment and alter the climate. Therefore, governments and companies all over the world should find new and renewable energy sources. On the other hand, over the past two decades, power station construction programs in the developing countries accounted for nearly 30% of total public investment. In a large number of these countries, shortages of electricity have become a critical constraint to economic growth. In Turkey, from 1980 to 1995, the amount for electricity generated increased about fourfold from 23,275 Gwh to 86,247 Gwh, and annual growth rates were in the double digits. This is a good development, but not enough for Turkey. (author)

  13. Electricity generation - safety and environmental impact

    International Nuclear Information System (INIS)

    Venkat Raj, V.

    2001-01-01

    The high economic/industrial growth and the rapid increase in population, particularly in the developing world, is spurring a correspondingly fast growth in energy consumption. Energy in the form of electricity is a convenient source and a rapid increase in electricity generation is foreseen. However, at the same time it should also be kept in mind that economic progress is only one aspect of the overall social well being. It is essential to ensure that our efforts to generate the much needed electricity do not result in any severe detrimental impact on society or environment. The possible impacts of thermal, hydro and nuclear energy options are discussed in this paper. The useful role nuclear energy can play in enabling sustainable development is also briefly discussed. (author)

  14. Understanding social acceptance of electricity generation sources

    International Nuclear Information System (INIS)

    Bronfman, Nicolás C.; Jiménez, Raquel B.; Arévalo, Pilar C.; Cifuentes, Luis A.

    2012-01-01

    Social acceptability is a determinant factor in the failure or success of the government's decisions about which electricity generation sources will satisfy the growing demand for energy. The main goal of this study was to validate a causal trust-acceptability model for electricity generation sources. In the model, social acceptance of an energy source is directly caused by perceived risk and benefit and also by social trust in regulatory agencies (both directly and indirectly, through perceived risk and benefit). Results from a web-based survey of Chilean university students demonstrated that data for energy sources that are controversial in Chilean society (fossil fuels, hydro, and nuclear power) fit the hypothesized model, whereas data for non conventional renewable energy sources (solar, wind, geothermal and tidal) did not. Perceived benefit had the greatest total effect on acceptability, thus emerging as a key predictive factor of social acceptability of controversial electricity generation sources. Further implications for regulatory agencies are discussed. - Highlights: ► We tested a causal trust-acceptability model for electricity generation sources in Chile. ► Data for controversial energy sources in the Chilean society (fossil fuels, hydro and nuclear power) fit the hypothesized model. ► Data for non conventional renewable energy sources did not fit the data. ► Perceived benefit showed the greatest total effect on acceptability.

  15. Partnership for electrical generation technology education

    International Nuclear Information System (INIS)

    Rasmussen, R. S.; Beaty, L.; Holman, R.

    2006-01-01

    This Engineering Technician education effort adapts an existing two-year Instrumentation and Control (I and C) education program into a model that is focused on electrical-generation technologies. It will also locally implement a program developed elsewhere with National Science Foundation funding, aimed at public schools, and adapt it to stimulate pre-college interest in pursuing energy careers in general. (authors)

  16. Implementation of optimum solar electricity generating system

    Science.gov (United States)

    Singh, Balbir Singh Mahinder; Sivapalan, Subarna; Najib, Nurul Syafiqah Mohd; Menon, Pradeep; Karim, Samsul Ariffin A.

    2014-10-01

    Under the 10th Malaysian Plan, the government is expecting the renewable energy to contribute approximately 5.5% to the total electricity generation by the year 2015, which amounts to 98MW. One of the initiatives to ensure that the target is achievable was to establish the Sustainable Energy Development Authority of Malaysia. SEDA is given the authority to administer and manage the implementation of the feed-in tariff (FiT) mechanism which is mandated under the Renewable Energy Act 2011. The move to establish SEDA is commendable and the FiT seems to be attractive but there is a need to create awareness on the implementation of the solar electricity generating system (SEGS). In Malaysia, harnessing technologies related to solar energy resources have great potential for implementation. However, the main issue that plagues the implementation of SEGS is the intermittent nature of this source of energy. The availability of sunlight is during the day time, and there is a need for electrical energy storage system, so that there is electricity available during the night time as well. The meteorological condition such as clouds, haze and pollution affects the SEGS as well. The PV based SEGS is seems to be promising electricity generating system that can contribute towards achieving the 5.5% target and will be able to minimize the negative effects of utilizing fossil fuels for electricity generation on the environment. Malaysia is committed to Kyoto Protocol, which emphasizes on fighting global warming by achieving stabilization of greenhouse gas concentrations in the atmosphere at a level that would prevent dangerous anthropogenic interference with the climate system. In this paper, the technical aspects of the implementation of optimum SEGS is discussed, especially pertaining to the positioning of the PV panels.

  17. Implementation of optimum solar electricity generating system

    Energy Technology Data Exchange (ETDEWEB)

    Singh, Balbir Singh Mahinder, E-mail: balbir@petronas.com.my; Karim, Samsul Ariffin A., E-mail: samsul-ariffin@petronas.com.my [Department of Fundamental and Applied Sciences, Universiti Teknologi PETRONAS, 31750 Bandar Seri Iskandar, Perak (Malaysia); Sivapalan, Subarna, E-mail: subarna-sivapalan@petronas.com.my [Department of Management and Humanities, Universiti Teknologi PETRONAS, 31750 Bandar Seri Iskandar, Perak (Malaysia); Najib, Nurul Syafiqah Mohd; Menon, Pradeep [Department of Electrical and Electronics Engineering, Universiti Teknologi PETRONAS, 31750 Bandar Seri Iskandar, Perak (Malaysia)

    2014-10-24

    Under the 10{sup th} Malaysian Plan, the government is expecting the renewable energy to contribute approximately 5.5% to the total electricity generation by the year 2015, which amounts to 98MW. One of the initiatives to ensure that the target is achievable was to establish the Sustainable Energy Development Authority of Malaysia. SEDA is given the authority to administer and manage the implementation of the feed-in tariff (FiT) mechanism which is mandated under the Renewable Energy Act 2011. The move to establish SEDA is commendable and the FiT seems to be attractive but there is a need to create awareness on the implementation of the solar electricity generating system (SEGS). In Malaysia, harnessing technologies related to solar energy resources have great potential for implementation. However, the main issue that plagues the implementation of SEGS is the intermittent nature of this source of energy. The availability of sunlight is during the day time, and there is a need for electrical energy storage system, so that there is electricity available during the night time as well. The meteorological condition such as clouds, haze and pollution affects the SEGS as well. The PV based SEGS is seems to be promising electricity generating system that can contribute towards achieving the 5.5% target and will be able to minimize the negative effects of utilizing fossil fuels for electricity generation on the environment. Malaysia is committed to Kyoto Protocol, which emphasizes on fighting global warming by achieving stabilization of greenhouse gas concentrations in the atmosphere at a level that would prevent dangerous anthropogenic interference with the climate system. In this paper, the technical aspects of the implementation of optimum SEGS is discussed, especially pertaining to the positioning of the PV panels.

  18. Implementation of optimum solar electricity generating system

    International Nuclear Information System (INIS)

    Singh, Balbir Singh Mahinder; Karim, Samsul Ariffin A.; Sivapalan, Subarna; Najib, Nurul Syafiqah Mohd; Menon, Pradeep

    2014-01-01

    Under the 10 th Malaysian Plan, the government is expecting the renewable energy to contribute approximately 5.5% to the total electricity generation by the year 2015, which amounts to 98MW. One of the initiatives to ensure that the target is achievable was to establish the Sustainable Energy Development Authority of Malaysia. SEDA is given the authority to administer and manage the implementation of the feed-in tariff (FiT) mechanism which is mandated under the Renewable Energy Act 2011. The move to establish SEDA is commendable and the FiT seems to be attractive but there is a need to create awareness on the implementation of the solar electricity generating system (SEGS). In Malaysia, harnessing technologies related to solar energy resources have great potential for implementation. However, the main issue that plagues the implementation of SEGS is the intermittent nature of this source of energy. The availability of sunlight is during the day time, and there is a need for electrical energy storage system, so that there is electricity available during the night time as well. The meteorological condition such as clouds, haze and pollution affects the SEGS as well. The PV based SEGS is seems to be promising electricity generating system that can contribute towards achieving the 5.5% target and will be able to minimize the negative effects of utilizing fossil fuels for electricity generation on the environment. Malaysia is committed to Kyoto Protocol, which emphasizes on fighting global warming by achieving stabilization of greenhouse gas concentrations in the atmosphere at a level that would prevent dangerous anthropogenic interference with the climate system. In this paper, the technical aspects of the implementation of optimum SEGS is discussed, especially pertaining to the positioning of the PV panels

  19. Nigeria electricity crisis: Power generation capacity expansion and environmental ramifications

    International Nuclear Information System (INIS)

    Aliyu, Abubakar Sadiq; Ramli, Ahmad Termizi; Saleh, Muneer Aziz

    2013-01-01

    Access to clean and stable electricity is essential in actualizing Nigeria's quest for joining the league of twenty most industrious nations by the year 2020 (vision 20:2020). No country can develop and sustain it development without having a minimum access to electricity for it larger percentage of its population. At present, Nigeria depends petroleum reserves and its aged hydro plant instalments for electricity generation to feed the 40% of its total population that are connected to the national grid. This paper summarizes literature on the current energy issues in Nigeria and introduces the difficulty of the issues involved. The paper also analyses the current (2010) electricity generation as well as the future expansion plans of the Government in 20 years period. The plan includes the introduction of new electrify generation technologies that have not been in used in the base year (2010). The electricity generation system of (including the future expansion plan) was simulated using the LEAP System (Long-range Energy Alternative and Planning). We also investigated the potential environmental impact of siting a nuclear power plant in one of the potential sites based on the site's specific micro-meteorology (land use) and meteorology using the US EPA (Environmental Protection Agency) models; AERMOD 12345. - Highlights: • This paper scrutinizes literature on Nigeria's energy crisis and presents the policies of the clean technology as solutions. • Only 40% of Nigeria's population is connected to the grid; and this population faces power problems 60% of the time. • Simulation of Nigeria electricity generation system was done. • Air dispersion modellingmodelling for radiological health risk from NPP was done

  20. Nonlinear characteristics of the rotating exciter system of power plant generators in case of electricity accidents; Transientes Verhalten des rotierenden Erregersystems von Kraftwerksgeneratoren bei elektrischen Stoerfaellen

    Energy Technology Data Exchange (ETDEWEB)

    Ataei, Nader

    2006-05-09

    Different types of exciter are used for voltage supply to the synchronous generators of power stations depending on the required power and design. The exciter system of the generator, which as a rule consists syncronous motors and commutators, is commonly modeled in conventional models by control units with nonlinear characteristics which do not give an accurate picture of the dynamic processes inside the exciter motor. It was not possible to assess the component loads of the exciter components and the physical characteristics within the exciter system. In this study, a brushless exciter for the grid-connected synchronous generator was investigated which consists of two synchronous motors as primary and secondary exciter and two commutator bridges. A dynamic simulation model was developed for calculating the interactions between the grid, generator and exciter unit in consideration of electromagnetic and galvanic coupling. For this, the normal control units were replaced by physical components of the exciter system, i.e. electric exciter motors and commutators. The study was carried out using an enhanced version of the Siemens NETOMAC software, which provided information on the loads on the exciter components in case of internal and external failures. In particular, loads in coils and commutators were calculated that could not be measured before. The findings enable more accurate dimensioning of the exciter unit making it more fail-safe, and the protective systems can be adjusted more accurately. One important result of the investigation was the identification of all dynamic processes going on between the exciter motors, commutators, generator and grid induced by external and internal failures. (orig.) [German] Zur Spannungsversorgung der Synchrongeneratoren in Kraftwerken werden je nach Leistungsanforderung und Baukonzept unterschiedliche Erregereinrichtungen verwendet. Das Erregersystem des Generators, das in der Regel aus Erregersynchronmaschinen und

  1. Cost of electricity from small scale co-generation of electricity and heat

    Energy Technology Data Exchange (ETDEWEB)

    Kjellstroem, Bjoern

    2012-07-15

    There is an increasing interest in Sweden for using also small heat loads for cogeneration of electricity and heat. Increased use of small CHP-plants with heat supply capacities from a few 100 kW(h) up to 10 MW(h) cannot change the structure of the electricity supply system significantly, but could give an important contribution of 2 - 6 TWh(e) annually. The objective of this study was to clarify under what conditions electricity can be generated in small wood fired CHP-plants in Sweden at costs that can compete with those for plants using fossil fuels or nuclear energy. The capacity range studied was 2 - 10 MW(h). The results should facilitate decisions about the meaningfulness of considering CHP as an option when new heat supply systems for small communities or sawmills are planned. At the price for green certificates in Sweden, 250 - 300 SEK/MWh(e), generation costs in small wood fired CHP-plants should be below about 775 SEK/MWh(e) to compete with new nuclear power plants and below about 925 SEK/MWh(e) to compete with generation using fossil fuels.

  2. Environmental evaluation of different forms of electric energy generation

    International Nuclear Information System (INIS)

    Guena, Ana Maria de Oliveira

    2007-01-01

    Electric energy has an important function in the modem world; it is fundamental for progress and development. The electricity discovery allowed improvements in several areas: health, water and food supply, quality of life and sanitary conditions, and contributed also to the establishment of the capitalist and consumption society. The use of oil as an energy generation source was the impulse for the industrial revolution and machines, motors and generators were developed contributing to the progress This also brought the pollutant gases emission (CO 2 , CO, SO x and NO x ) and other substances that had contributed to the greenhouse effect, the ozone hole and the acid rain, modifying the balance of the planet. The development and implementation of other forms of energy generation caused local changes, where they were installed, giving rise to environmental impacts. This work presents an evaluation about different forms of electrical energy generation and the environmental impacts relative to each one of them. Five forms of electric energy generation were considered: thermoelectric, nuclear, hydroelectric, wind and solar energy. The implementation and the development of the petroleum industry in the world and in Brazil are presented. The geology of the oil, its extraction and quality improvement, besides details of the functioning of three types of thermoelectric power plants - coal, gas and oil - are also discussed. The specific as well as the environmental impacts they have in common are highlighted. The impacts originated from the deactivation of each one of them are also pointed out. The discovery and the development of nuclear energy in Brazil and in the world as well as the functioning of a nuclear power plant, the impacts generated by its operation and decommissioning are presented. The history, functioning and development of hydroelectric energy generation in Brazil, characterized by the great plants, are related to environmental aspects The environmental

  3. Nuclear and conventional baseload electricity generation cost experience

    International Nuclear Information System (INIS)

    1993-04-01

    The experienced costs of electricity generation by nuclear and conventional plants and the expected costs of future plants are important for evaluating the economic attractiveness of various power projects and for planning the expansion of electrical generating systems. The main objective of this report is to shed some light on recent cost experience, based on well authenticated information made available by the IAEA Member States participating in this study. Cost information was provided by Canada (Ontario Hydro), Czechoslovakia, Hungary, India, the Republic of Korea and Spain. Reference is also made to information received from Brazil, China, France, Russia and the United States of America. The part of the report that deals with cost experience is Section 2, where the costs of both nuclear and fossil fired plants are reviewed. Other sections give emphasis to the analysis of the major issues and relevant cost elements influencing the costs of nuclear power plants and to a discussion of cost projections. Many of the conclusions can also be applied to conventional plants, although they are usually less important than in the case of nuclear plants. 1 ref., figs and tabs

  4. Sustainability evaluation of decentralized electricity generation

    International Nuclear Information System (INIS)

    Karger, Cornelia R.; Hennings, Wilfried

    2009-01-01

    Decentralized power generation is gaining significance in liberalized electricity markets. An increasing decentralization of power supply is expected to make a particular contribution to climate protection. This article investigates the advantages and disadvantages of decentralized electricity generation according to the overall concept of sustainable development. On the basis of a hierarchically structured set of sustainability criteria, four future scenarios for Germany are assessed, all of which describe different concepts of electricity supply in the context of the corresponding social and economic developments. The scenarios are developed in an explorative way according to the scenario method and the sustainability criteria are established by a discursive method with societal actors. The evaluation is carried out by scientific experts. By applying an expanded analytic hierarchy process (AHP), a multicriteria evaluation is conducted that identifies dissent among the experts. The results demonstrate that decentralized electricity generation can contribute to climate protection. The extent to which it simultaneously guarantees security of supply is still a matter of controversy. However, experts agree that technical and economic boundary conditions are of major importance in this field. In the final section, the article discusses the method employed here as well as implications for future decentralized energy supply. (author)

  5. Sustainability evaluation of decentralized electricity generation

    Energy Technology Data Exchange (ETDEWEB)

    Karger, Cornelia R.; Hennings, Wilfried [Research Centre Juelich, Programme Group Humans, Environment, Technology (MUT), 52425 Juelich (Germany)

    2009-04-15

    Decentralized power generation is gaining significance in liberalized electricity markets. An increasing decentralization of power supply is expected to make a particular contribution to climate protection. This article investigates the advantages and disadvantages of decentralized electricity generation according to the overall concept of sustainable development. On the basis of a hierarchically structured set of sustainability criteria, four future scenarios for Germany are assessed, all of which describe different concepts of electricity supply in the context of the corresponding social and economic developments. The scenarios are developed in an explorative way according to the scenario method and the sustainability criteria are established by a discursive method with societal actors. The evaluation is carried out by scientific experts. By applying an expanded analytic hierarchy process (AHP), a multicriteria evaluation is conducted that identifies dissent among the experts. The results demonstrate that decentralized electricity generation can contribute to climate protection. The extent to which it simultaneously guarantees security of supply is still a matter of controversy. However, experts agree that technical and economic boundary conditions are of major importance in this field. In the final section, the article discusses the method employed here as well as implications for future decentralized energy supply. (author)

  6. Gas use in electric generation in USA

    International Nuclear Information System (INIS)

    1998-01-01

    The expansion in gas use in electric generation has called new attention to challenges that are faced by organizations in both the gas and electric industries. Thus, many institutes around the world are involved in analyses that include variety of operational requirements and constraints, human relations' factors, and business practices. The article presents a part of extensive Gas Research Institute's analyses, which is prepared for needs of the both industries in USA (GRI is USA leading institute in gas research, development and commercial application). Via the great Internet possibilities, these analyses are accessible on a large world public. (orig.)

  7. Sustainability considerations for electricity generation from biomass

    International Nuclear Information System (INIS)

    Evans, Annette; Strezov, Vladimir; Evans, Tim J.

    2010-01-01

    The sustainability of electricity generation from biomass has been assessed in this work according to the key indicators of price, efficiency, greenhouse gas emissions, availability, limitations, land use, water use and social impacts. Biomass produced electricity generally provides favourable price, efficiency, emissions, availability and limitations but often has unfavorably high land and water usage as well as social impacts. The type and growing location of the biomass source are paramount to its sustainability. Hardy crops grown on unused or marginal land and waste products are more sustainable than dedicated energy crops grown on food producing land using high rates of fertilisers. (author)

  8. Importance of hard coal in electricity generation in Poland

    Science.gov (United States)

    Plewa, Franciszek; Strozik, Grzegorz

    2017-11-01

    Polish energy sector is facing a number of challenges, in particular as regards the reconstruction of production potential, diversification of energy sources, environmental issues, adequate fuels supplies and other. Mandatory implementation of Europe 2020 strategy in terms of “3x20” targets (20% reduction of greenhouse gases, 20% of energy from renewable sources, and 20% increase of efficiency in energy production) requires fast decision, which have to be coordinated with energetic safety issues, increasing demands for electric energy, and other factors. In Poland almost 80% of power is installed in coal fired power plants and energy from hard coals is relatively less expensive than from other sources, especially renewable. The most of renewable energy sources power plants are unable to generate power in amounts which can be competitive with coal fires power stations and are highly expensive, what leads o high prices of electric energy. Alternatively, new generation of coal fired coal power plants is able to significantly increase efficiency, reduce carbon dioxide emission, and generate less expensive electric power in amounts adequate to the demands of a country.

  9. Electrical power systems for distributed generation

    Energy Technology Data Exchange (ETDEWEB)

    Robertson, T.A.; Huval, S.J. [Stewart & Stevenson Services, Inc., Houston, TX (United States)

    1996-12-31

    {open_quotes}Distributed Generation{close_quotes} has become the {open_quotes}buzz{close_quotes} word of an electric utility industry facing deregulation. Many industrial facilities utilize equipment in distributed installations to serve the needs of a thermal host through the capture of exhaust energy in a heat recovery steam generator. The electrical power generated is then sold as a {open_quotes}side benefit{close_quotes} to the cost-effective supply of high quality thermal energy. Distributed generation is desirable for many different reasons, each with unique characteristics of the product. Many years of experience in the distributed generation market has helped Stewart & Stevenson to define a range of product features that are crucial to most any application. The following paper will highlight a few of these applications. The paper will also examine the range of products currently available and in development. Finally, we will survey the additional services offered by Stewart & Stevenson to meet the needs of a rapidly changing power generation industry.

  10. Electrical-Generation Scenarios for China

    Energy Technology Data Exchange (ETDEWEB)

    Kypreos, S.; Krakowski, R.A.

    2002-03-01

    The China Energy Technology Program (CETP) used both optimizing and simulation energy- economic-environmental (E3) models to assess tradeoffs in the electricity-generation sector for a range of fuel, transport, generation, and distribution options. The CETP is composed of a range of technical tasks or activities, including Energy Economics Modeling (EEM, optimizations), Electric Sector Simulation (ESS, simulations), Life Cycle Analyses (LCA, externalization) of energy systems, and Multi-Criteria Decision Analyses (MCDA, integration). The scope of CETP is limited to one province (Shandong), to one economic sector (electricity), and to one energy sector (electricity). This document describes the methods, approaches, limitations, sample results, and future/needed work for the EEM ( optimization-based modeling) task that supports the overall goal of CETP. An important tool used by the EEM task is based on a Linear Programming (LP) optimization model that considers 17 electricity-generation technologies utilizing 14 fuel forms (type, composition, source) in a 7-region transportation model of China's electricity demand and supply system over the period 2000-2030; Shandong is one of the seven regions modeled. The China Regional Electricity Trade Model (CRETM) is used to examine a set of energy-environment-economy E3-driven scenarios to quantify related policy implications. The development of electricity production mixes that are optimized under realistically E3 constraints is determined through regional demands for electricity that respond to exogenous assumptions on income (GDP) and electricity prices through respective time-dependent elasticities. Constraints are applied to fuel prices, transportation limits, resource availability, introduction (penetration) rates of specific technology, and (where applicable) to local, regional, and countrywide emission rates of CO{sub 2}, SO{sub 2} and NO{sub x}. Importantly, future inter- regional energy flows are optimized with

  11. Environmental effects of the electric power generation

    International Nuclear Information System (INIS)

    Velez Ocon, C.

    1991-01-01

    Every manner to generate electricity has effects on environment and on the way of life of human society. Nevertheless electricity is a way of secondary energy handy and clean and is also frequently the more efficient, and for its reason its use is growing in countries with a rate superior to the increase in national gross product. This is particularly remarkable in Mexico where still exist population sectors without electricity services and where the demand per capita is left behind with respect to other economic indicators. In the last years, preoccupation for environmental effects in human activities, especially that related with the production and use of energy, has been increasing. 'Acid rain', air and water pollution, destruction of stratospheric ozone layer, global heating, radioactive wastes storage, land use, destruction of tropical forest, inundation of archaeological ruins, extintion of animal and vegetable species, are examples of problems daily expound to society (Author)

  12. Utilization of oil wells for electricity generation: Performance and economics

    International Nuclear Information System (INIS)

    Kharseh, Mohamad; Al-Khawaja, Mohammed; Hassani, Ferri

    2015-01-01

    There is a general agreement that the climate change, which is the most important challenge facing humanity, is anthropogenic and attributed to fossil fuel consumption. Therefore, deploying more renewable energy resources is an urgent issue to be addressed. Geothermal refers to existing heat energy in deep rock and sedimentary basins. Traditionally, geothermal energy has been exploited in places with plentiful hot water at relatively shallow depth. Unfortunately, the high exploration and drilling costs of boreholes is the main barrier to the commerciality of geothermal worldwide. In oil producing countries, such problems can be overcome by utilizing oil or gas wells. The current study presents thermodynamic and economic analyses of a binary geothermal power generation system for commercial electricity generation. Two different source temperatures (100 and 120 °C) and constant sink temperature (29 °C) were considered. The optimal working fluid and optimal design that improve the performance of the plant are determined. For the current costs in Qatar, the economical analysis of 5 MW geothermal plant shows that the levelized cost of electricity for the plant varies from 5.6 to 5.2 ¢/kW. Whereas, the payback period of such plants lies between 5.8 and 4.8 years. - Highlights: • Utilizing oil well makes geothermal plant competitive with other resources. • R32 seems to be the best working fluid. • The levelized cost of electricity for geothermal plant is less than 5.6 ¢/kWh. • The payback time of geothermal plant is less than 6 years.

  13. Displacing the dinosaurs. [Diesel engine electric generators

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    1992-05-01

    This article describes how giant power stations are being replaced by smaller, cleaner units. These include plants using combined-cycle gas turbines and diesel engines of low, medium and high speeds. The use of these diesel engines in power generation is discussed. (UK).

  14. Nuclear Power Plants in a Competitive Electricity Market

    International Nuclear Information System (INIS)

    Jankauskas, V.

    2002-01-01

    Electricity demand is growing in the world by an average rate of 3% and, according to the International Energy Agency, is going to keep this pace of growth for the 1st quarter of the 21st century. At the same time, the role of the nuclear in the world energy mix is diminishing, and in 2020 only 9% of the world electricity will be produced at the nuclear plants versus 17% in 2000. The main reasons for the nuclear power diminishing share in the world market are not environmental or safety problems, as one may assume, but technical and economical. Long construction time, high capital cost, huge liabilities connected with the spent nuclear fuel and radioactive waste treatment, storage and final disposal are the main factors restricting the further growth of the nuclear power. Nevertheless, in the liberalized markets (U.K., Germany, Scandinavian countries) nuclear power plants are operating rather successfully. In a short run nuclear plants may become very competitive as they have very low short-run marginal costs, but in the long run they may become very in competitive. The Ignalina NPP plays the dominant ro]e in the Lithuanian electricity market, producing more than 75% of the total domestic electricity. It produces the cheapest electricity in Lithuania, mostly due to its higher availability, than the thermal power plants. The price of electricity sold by Ignalina is also lower as it does not cover all costs connected with the future decommissioning of the plant, spent fuel storage and final disposal. If at least part of this cost were included into the selling price, Ignalina might become highly competitive in a liberalised electricity market. As the Lithuanian Electricity law requires to deregulate electricity. generation prices, these prices should be set by the market. (author)

  15. The Birth of Nuclear-Generated Electricity

    Science.gov (United States)

    1999-09-01

    The Experimental Breeder Reactor-I (EBR-I), built in Idaho in 1949, generated the first usable electricity from nuclear power on December 20, 1951. More importantly, the reactor was used to prove that it was possible to create more nuclear fuel in the reactor than it consumed during operation -- fuel breeding. The EBR-I facility is now a National Historic Landmark open to the public.

  16. The SEPnet coil demonstrates electricity generation

    Science.gov (United States)

    Harvey, Clare; Hare, Jonathan

    2009-11-01

    The South East Physics Network (SEPnet) (www.sepnet.ac.uk/gcse.php) is exploring various ways to enhance physics learning and A-level uptake, including a series of interactive GCSE revision events. The first event, which includes talks and various physics exhibits by leading teachers and educators, is on energy and the exhibition—called 'Who will keep the lights on?'—is travelling around southern UK venues. Here we describe the demonstration that shows how electricity is generated.

  17. The Efficiency Improvement by Combining HHO Gas, Coal and Oil in Boiler for Electricity Generation

    Directory of Open Access Journals (Sweden)

    Chia-Nan Wang

    2017-02-01

    Full Text Available Electricity is an essential energy that can benefit our daily lives. There are many sources available for electricity generation, such as coal, natural gas and nuclear. Among these sources, coal has been widely used in thermal power plants that account for about 41% of the worldwide electricity supply. However, these thermal power plants are also found to be a big pollution source to our environment. There is a need to explore alternative electricity sources and improve the efficiency of electricity generation. This research focuses on improving the efficiency of electricity generation through the use of hydrogen and oxygen mixture (HHO gas. In this research, experiments have been conducted to investigate the combined effects of HHO gas with other fuels, including coal and oil. The results show that the combinations of HHO with coal and oil can improve the efficiency of electricity generation while reducing the pollution to our environment.

  18. Scenarios for low carbon and low water electric power plant ...

    Science.gov (United States)

    In the water-energy nexus, water use for the electric power sector is critical. Currently, the operational phase of electric power production dominates the electric sector's life cycle withdrawal and consumption of fresh water resources. Water use associated with the fuel cycle and power plant equipment manufacturing phase is substantially lower on a life cycle basis. An outstanding question is: how do regional shifts to lower carbon electric power mixes affect the relative contribution of the upstream life cycle water use? To test this, we examine a range of scenarios comparing a baseline with scenarios of carbon reduction and water use constraints using the MARKet ALlocation (MARKAL) energy systems model with ORD's 2014 U.S. 9-region database (EPAUS9r). The results suggest that moving toward a low carbon and low water electric power mix may increase the non-operational water use. In particular, power plant manufacturing water use for concentrating solar power, and fuel cycle water use for biomass feedstock, could see sharp increases under scenarios of high deployment of these low carbon options. Our analysis addresses the following questions. First, how does moving to a lower carbon electricity generation mix affect the overall regional electric power water use from a life cycle perspective? Second, how does constraining the operational water use for power plants affect the mix, if at all? Third, how does the life cycle water use differ among regions under

  19. Technical notes for the conceptual design for an atmospheric fluidized-bed direct combustion power generating plant. [570 MWe plant

    Energy Technology Data Exchange (ETDEWEB)

    None

    1978-04-01

    The design, arrangement, thermodynamics, and economics of a 578 MW(e) (nominal gross) electric power generating plant equipped with a Foster Wheeler Energy Corporation (FWEC) atmospheric fluidized bed (AFB) boiler are described. Information is included on capital and operating costs, process systems, electrical systems, control and instrumentation, and environmental systems. This document represents a portion of an overall report describing the conceptual designs of two atmospheric fluidized bed boilers and balance of plants for the generation of electric power and the analysis and comparison of these conceptual designs to a conventional pulverized coal-fired electric power generation plant equipped with a wet limestone flue gas desulfurization system.

  20. Technical notes for the conceptual design for an atmospheric fluidized-bed direct combustion power generating plant. [570 MWe plant

    Energy Technology Data Exchange (ETDEWEB)

    None

    1978-04-01

    The design, arrangement, thermodynamics, and economics of a 592 MW(e) (nominal gross) electric power generating plant equipped with a Babcock and Wilcox Company (B and W) atmospheric fluidized bed (AFB) boiler are described. Information is included on capital and operating costs, process systems, electrical systems, control and instrumentation, and environmental systems. This document represents a portion of an overall report describing the conceptual designs of two atmospheric fluidized bed boilers and balance of plants for the generation of electric power and the analysis and comparison of these conceptual designs to a conventional pulverized coal-fired electric power generation plant equipped with a wet limestone flue gas desulfurization system.

  1. Nuclear Power as a Basis for Future Electricity Generation

    Science.gov (United States)

    Pioro, Igor; Buruchenko, Sergey

    2017-12-01

    It is well known that electrical-power generation is the key factor for advances in industry, agriculture, technology and the level of living. Also, strong power industry with diverse energy sources is very important for country independence. In general, electrical energy can be generated from: 1) burning mined and refined energy sources such as coal, natural gas, oil, and nuclear; and 2) harnessing energy sources such as hydro, biomass, wind, geothermal, solar, and wave power. Today, the main sources for electrical-energy generation are: 1) thermal power - primarily using coal and secondarily - natural gas; 2) “large” hydro power from dams and rivers and 3) nuclear power from various reactor designs. The balance of the energy sources is from using oil, biomass, wind, geothermal and solar, and have visible impact just in some countries. In spite of significant emphasis in the world on using renewables sources of energy, in particular, wind and solar, they have quite significant disadvantages compared to “traditional” sources for electricity generation such as thermal, hydro, and nuclear. These disadvantages include low density of energy, which requires large areas to be covered with wind turbines or photovoltaic panels or heliostats, and dependence of these sources on Mother Nature, i.e., to be unreliable ones and to have low (20 - 40%) or very low (5 - 15%) capacity factors. Fossil-fueled power plants represent concentrated and reliable source of energy. Also, they operate usually as “fast-response” plants to follow rapidly changing electrical-energy consumption during a day. However, due to combustion process they emit a lot of carbon dioxide, which contribute to the climate change in the world. Moreover, coal-fired power plants, as the most popular ones, create huge amount of slag and ash, and, eventually, emit other dangerous and harmful gases. Therefore, Nuclear Power Plants (NPPs), which are also concentrated and reliable source of energy

  2. Improving nuclear generating station response for electrical grid islanding

    International Nuclear Information System (INIS)

    Chou, Q.B.; Kundur, P.; Acchione, P.N.; Lautsch, B.

    1989-01-01

    This paper describes problems associated with the performance characteristics of nuclear generating stations which do not have their overall plant control design functions co-ordinated with the other grid controls. The paper presents some design changes to typical nuclear plant controls which result in a significant improvement in both the performance of the grid island and the chances of the nuclear units staying on-line following the disturbance. This paper focuses on four areas of the overall unit controls and turbine governor controls which could be modified to better co-ordinate the control functions of the nuclear units with the electrical grid. Some simulation results are presented to show the performance of a typical electrical grid island containing a nuclear unit with and without the changes

  3. Electricity generation in a sustainable development perspective

    International Nuclear Information System (INIS)

    Venkat Raj, V.; Saradhi, I.V.

    2003-01-01

    The increasing impact of energy technologies on the environment and possible effects on future generations has been a cause of concern in recent years. This has resulted in an awareness regarding the need for viewing the role of electricity production by different methods, using different fuels/sources, in a sustainable development perspective, which calls for the needs of the present generation to be met without compromising the ability of future generations to meet their own needs. This papers deals with some of the relevant issues in this regard. The world and the Indian energy scenarios are presented, followed by the data on the consequent carbon-dioxide emissions. The green house effect and the possible means of carbon sequestration are explained briefly. The important role nuclear energy can play in a sustainable development perspective is discussed, considering the various aspects such as resources, safety, radiological protection, cost externalities and environment impact. (author)

  4. Simulation of power plant construction in competitive Korean electricity market

    International Nuclear Information System (INIS)

    Ahn, Nam Sung; Huh, Sung Chul

    2001-01-01

    This paper describes the forecast of power plant construction in competitive Korean electricity market. In Korea, KEPCO (Korean Electric Power Corporation, fully controlled by government) was responsible for from the production of the electricity to the sale of electricity to customer. However, the generation part is separated from KEPCO and six generation companies were established for whole sale competition from April 1st, 2001. The generation companies consist of five fossil power companies and one nuclear power company. Fossil power companies are schedule to be sold to private companies including foreign investors. Nuclear power company is owned by government. The competition in generation market will start from 2003. ISO (Independence System Operator) will purchase the electricity from the power exchange market. The market price is determined by the SMP (System Marginal Price) which is decided by the balance between demand and supply of electricity in power exchange market. Under this uncertain circumstance, the energy policy planners are interested to the construction of the power plant in the future. These interests are accelerated due to the recent shortage of electricity supply in California. In the competitive market, investors are no longer interested in the investment for the capital intensive, long lead time generating technologies. Large nuclear and coal plants were no longer the top choices. Instead, investors in the competitive market are interested in smaller, more efficient, cheaper, cleaner technologies such as CCGT (Combined Cycle Gas Turbine). Electricity is treated as commodity in the competitive market. The investor's behavior in the commodity market shows that the new investment decision is made when the market price exceeds the sum of capital cost and variable cost of the new facility and the existing facility utilization depends on the marginal cost of the facility. This investor's behavior can be applied to the new investments for the

  5. Environmental codes of practice for steam electric power generation

    International Nuclear Information System (INIS)

    1985-03-01

    The Design Phase Code is one of a series of documents being developed for the steam electric power generation industry. This industry includes fossil-fuelled stations (gas, oil and coal-fired boilers), and nuclear-powered stations (CANDU heavy water reactors). In this document, environmental concerns associated with water-related and solid waste activities of steam electric plants are discussed. Design recommendations are presented that will minimize the detrimental environmental effects of once-through cooling water systems, of wastewaters discharged to surface waters and groundwaters, and of solid waste disposal sites. Recommendations are also presented for the design of water-related monitoring systems and programs. Cost estimates associated with the implementation of these recommendations are included. These technical guides for new or modified steam electric stations are the result to consultation with a federal-provincial-industry task force

  6. A CALCULATION METHOD OF TRANSIENT MODES OF ELECTRIC SHIPS’ PROPELLING ELECTRIC PLANTS

    Directory of Open Access Journals (Sweden)

    V. A. Yarovenko

    2017-12-01

    Full Text Available The purpose of the work is to develop the method for calculating the transient modes of electric ships’ propelling electric plants during maneuver. This will allow us to evaluate and improve the maneuverability of vessels with electric motion. Methodology. The solution to the problems is proposed to be carried out on the basis of mathematical modeling of maneuvering modes. The duration of transient modes in an electric power plant at electric ships’ maneuvers is commensurable with the transient operation modes of the vessel itself. Therefore, the analysis of the electric power plants’ maneuvering modes should be made in unity with all the components of the ship’s propulsion complex. Results. A specified mathematical model of transient regimes of electric ship’s propulsion complex, including thermal motors, synchronous generators, electric power converters, propulsion motors, propellers, rudder, ship’s hull is developed. The model is universal. It covers the vast majority of modern and promising electric ships with a traditional type of propulsors. It allows calculating the current values of the basic mode indicators and assessing the quality indicators of maneuvering. The model is made in relative units. Dimensionless parameters of the complex are obtained. These parameters influence the main indicators of the quality of maneuvering. The adequacy of the suggested specified mathematical model and the developed computation method based on it were confirmed. To do this, the results of mathematical modeling for a real electric ship were compared with the data obtained in the course of field experiments conducted by other researchers. Originality. The mathematical description of a generator unit, as an integral part of an indivisible ship’s propulsion complex, makes it possible to calculate the dynamic operation modes of electric power sources during electric vessels’ maneuvering. There is an opportunity to design the electric ships

  7. Electricity generation from digitally printed cyanobacteria.

    Science.gov (United States)

    Sawa, Marin; Fantuzzi, Andrea; Bombelli, Paolo; Howe, Christopher J; Hellgardt, Klaus; Nixon, Peter J

    2017-11-06

    Microbial biophotovoltaic cells exploit the ability of cyanobacteria and microalgae to convert light energy into electrical current using water as the source of electrons. Such bioelectrochemical systems have a clear advantage over more conventional microbial fuel cells which require the input of organic carbon for microbial growth. However, innovative approaches are needed to address scale-up issues associated with the fabrication of the inorganic (electrodes) and biological (microbe) parts of the biophotovoltaic device. Here we demonstrate the feasibility of using a simple commercial inkjet printer to fabricate a thin-film paper-based biophotovoltaic cell consisting of a layer of cyanobacterial cells on top of a carbon nanotube conducting surface. We show that these printed cyanobacteria are capable of generating a sustained electrical current both in the dark (as a 'solar bio-battery') and in response to light (as a 'bio-solar-panel') with potential applications in low-power devices.

  8. Hydraulic turbines uses for rural electric generation

    International Nuclear Information System (INIS)

    Genta, J.; Nunes, V.

    1994-01-01

    The micro turbines use for electric generation either in autonomous systems or in connection to the national net is presented like an alternative whose viability has been studied in the Agreement taken place between the UTE Administracion Nacional de Usinas y transmisiones Electricas y la Facultad de Ingenieria. The Agreement S tudy for the Installation of Micro turbines that initially considered areas far from the national electric net it extended then to near areas to the same one to analyze the cogeneration alternative. They were considered smaller and bigger powers than 1 MW and up to 5MW. For the whole study range a methodology is described of calculate primary, starting from a minimum of field information that allows a first estimate of viability of a certain place and the selection of the turbine type, for a later detailed study

  9. Analyze the economic and environmental viability in distributed generation of electric power from renewable sources

    International Nuclear Information System (INIS)

    Jantim Neto, Humberto

    2010-01-01

    This paper brings a brief of economical and social environmental analysis about distributed electric's energy generation, based on a comparison to centralized generation. The motivation of the proposed analysis has its origin on a reflection about politics and scheming directed to Brazilian's energy sector. This study has renewable energy resources as setting, represented for Belo Monte generation's plant and undertaking registered on the Reservation's Energy Auction 2010. The study took into account economics and technical aspects, whereas the viability analysis was formed from benefits got from different forms of electric's generation. The conclusions of this shows that distributed electric's energy generation may have economics and socio environment benefits over centralized generation. (author)

  10. CO2 emissions of nuclear electricity generation

    International Nuclear Information System (INIS)

    Wissel, Steffen; Mayer-Spohn, Oliver; Fahl, Ulrich; Blesl, Markus; Voss, Alfred

    2008-01-01

    A survey of LCA studies on nuclear electricity generation revealed life cycle CO 2 emissions ranging between 3 g/kWhe to 60 g/kWhe and above. Firstly, this paper points out the discrepancies in studies by estimating the CO 2 emissions of nuclear power generation. Secondly, the paper sets out to provide critical review of future developments of the fuel cycle for light water reactors and illustrates the impact of uncertainties on the specific CO 2 emissions of nuclear electricity generation. Each step in the fuel cycle will be considered and with regard to the CO 2 emissions analysed. Thereby different assumptions and uncertainty levels are determined for the nuclear fuel cycle. With the impacts of low uranium ore grades for mining and milling as well as higher burn-up rates future fuel characteristics are considered. Sensitivity analyses are performed for all fuel processing steps, for different technical specifications of light water reactors as well as for further external frame conditions. (authors)

  11. What about improving the productivity of electric power plants

    International Nuclear Information System (INIS)

    Lawroski, H.; Knecht, P.D.; Prideaux, D.L.; Zahner, R.R.

    1976-01-01

    The FEA in April of 1974 established an Interagency Task Group on Power Plant Reliability, which was charged with the broad objective of improving the productivity of existing and planned large fossil-fueled and nuclear power plants. It took approximately 11 months for the task force to publish a report, ''Report on Improving the Productivity of Electrical Power Plants'' (FEA-263-G), a detailed analysis and comparison of successful and below-average-performance power plants. The Nuclear Service Corp. portion of this study examined four large central-station power plants: two fossil (coal) and two nuclear plants. Only plants with electrical generation capacities greater than 400 MWe were considered. The study included the following: staff technical skill, engineering support, QA program, plant/corporate coordination, operation philosophy, maintenance programs, federal/state regulations, network control, and equipment problems. Personnel were interviewed, and checklists providing input from some 21 or more plant and corporate personnel of each utility were utilized. Reports and other documentation were also reviewed. It was recognized early that productivity is closely allied to technical skills and positive motivation. For this reason, considerable attention was given to people in this study

  12. Electricity generation from wetlands with activated carbon bioanode

    Science.gov (United States)

    Sudirjo, E.; Buisman, C. J. N.; Strik, D. P. B. T. B.

    2018-03-01

    Paddy fields are potential non-tidal wetlands to apply Plant Microbial Fuel Cell (PMFC) technology. World widely they cover about 160 million ha of which 13.3 million ha is located in Indonesia. With the PMFC, in-situ electricity is generated by a bioanode with electrochemically active bacteria which use primary the organic matter supplied by the plant (e.g. as rhizodeposits and plant residues). One of limitations when installing a PMFC in a non-tidal wetland is the usage of “expensive” large amounts of electrodes to overcome the poor conductivity of wet soils. However, in a cultivated wetland such as rice paddy field, it is possible to alter soil composition. Adding a conductive carbon material such as activated carbon is believed to improve soil conductivity with minimum impact on plant vitality. The objective of this research was to study the effect of activated carbon as an alternative bioanode material on the electricity output and plants vitality. Lab result shows that activated carbon can be a potential alternative for bioanode material. It can continuously deliver current on average 1.54 A/m3 anode (0.26 A/m2 PGA or 66 mW/m2 PGA) for 98 days. Based on this result the next step is to do a test of this technology in the real paddy fields.

  13. Life cycle assessment, electricity generation and sustainability

    International Nuclear Information System (INIS)

    Aumonier, S.

    1998-01-01

    When making a choice between alternatives, in whatever field, it is essential to have regard for the complete set of costs and benefits, in the widest possible sense, that will result in each case. The preferred option should be that which confers the maximum benefit, although relevant objectives will often conflict and its identification may be far from straightforward. Life cycle assessment (LCA) is an environmental accounting tool for measuring the inputs and outputs of an option, whether a product, a process or an activity. This paper explains the principles and methodologies involved in LCA, its application to the nuclear sector, and to electricity generating options and sustainable development. (author)

  14. Nuclear power plant electrical cable damageability experiments

    International Nuclear Information System (INIS)

    Lukens, L.L.

    1982-10-01

    Under the direction of the Nuclear Regulatory Commission, Sandia National Laboratories has been conducting confirmatory research in fire protection for nuclear power plants. As a part of this research, a program was developed to determine the damageability of electrical-cable insulation to thermal radiation in a loaded cable tray. The critical flux or threshold level at which cable damage occurs in the form of electrical failure (short from conductor to tray) and nonpiloted ignition was determined for two types of electrical cable, one an IEEE-383 qualified cable and the other an unqualified cable. A program was also developed to determine the damageability of electrical-cable insulation to constant temperature, thermal exposure

  15. Recent developments in the electricity generation market in 2014

    International Nuclear Information System (INIS)

    Hofmann, Holger

    2015-01-01

    Following up the report on the developments in the Electricity market from last year to this case this article shall give an overview of the current developments in 2014. The year 2014 was marked by the energy sector Program of the coalition agreement, which, under the three objectives of security of supply Affordability and environmental impact which has made clear Specifications for the production side in particular with regard to the final Nuclear Phase-out phase, the announced amendment of the EEG, system stability and also Fracking. The predominant theme in 2014 this was certainly the reform of the EEG and around it rambling topics on European level. Too much uncertainty with plant operators, investors and companies in German power generation market, has led in addition to the mentioned legislative package the revision of the EU environmental and energy aid guidelines, State aid procedure of the European Commission regarding the German promotion of electricity from renewable Energy and the process in the case of Aaland Vindkraft before the ECJ. The dynamics on the generation side, inter alia through the increased connection of decentralized generation plants, result in an increasing regulation in power generation. Finally a first bill for Fracking is published at the end of 2014. [de

  16. Primary electric power generation systems for advanced-technology engines

    Science.gov (United States)

    Cronin, M. J.

    1983-01-01

    The advantages of the all electric airplane are discussed. In the all electric airplane the generator is the sole source of electric power; it powers the primary and secondary flight controls, the environmentals, and the landing gear. Five candidates for all electric power systems are discussed and compared. Cost benefits of the all electric airplane are discussed.

  17. The electrical system of nuclear power plant

    International Nuclear Information System (INIS)

    Firman Silitonga; Gunarwan Prayitno

    2009-01-01

    In these system, electrical power system is supplied from two-offsite transmission system respective main transformer and house service transformer; and reserve transformer. The electrical load in these system consist of safety electrical system and non-safety electrical system, The safety electrical and non safety electrical systems consist of four 6,9 kV AC medium voltage bus and 480 V AC low voltage bus system. The DC power system consist of four safety 125 V DC power system and the two non-safety 125 DC power systems. The equipment in these electrical system is main turbine-generator; GTG safety; GTG alternate; uninterrupted power supply (UPS) and battery system. To protect electrical equipment and building to direct stroke and non direct stroke disturbances is installed netral grounding system and lightning protection and protection the personnel to touch-voltage is installed equipment grounding system and station grounding. The lightning arrester system is connected to station station grounding system. (author)

  18. Cost and Performance Assumptions for Modeling Electricity Generation Technologies

    Energy Technology Data Exchange (ETDEWEB)

    Tidball, R.; Bluestein, J.; Rodriguez, N.; Knoke, S.

    2010-11-01

    The goal of this project was to compare and contrast utility scale power plant characteristics used in data sets that support energy market models. Characteristics include both technology cost and technology performance projections to the year 2050. Cost parameters include installed capital costs and operation and maintenance (O&M) costs. Performance parameters include plant size, heat rate, capacity factor or availability factor, and plant lifetime. Conventional, renewable, and emerging electricity generating technologies were considered. Six data sets, each associated with a different model, were selected. Two of the data sets represent modeled results, not direct model inputs. These two data sets include cost and performance improvements that result from increased deployment as well as resulting capacity factors estimated from particular model runs; other data sets represent model input data. For the technologies contained in each data set, the levelized cost of energy (LCOE) was also evaluated, according to published cost, performance, and fuel assumptions.

  19. Hybrid biomass-wind power plant for reliable energy generation

    International Nuclear Information System (INIS)

    Perez-Navarro, A.; Alfonso, D.; Alvarez, C.; Ibanez, F.; Sanchez, C.; Segura, I.

    2010-01-01

    Massive implementation of renewable energy resources is a key element to reduce CO 2 emissions associated to electricity generation. Wind resources can provide an important alternative to conventional electricity generation mainly based on fossil fuels. However, wind generators are greatly affected by the restrictive operating rules of electricity markets because, as wind is naturally variable, wind generators may have serious difficulties on submitting accurate generation schedules on a day ahead basis, and on complying with scheduled obligations in real-time operation. In this paper, an innovative system combining a biomass gasification power plant, a gas storage system and stand-by generators to stabilize a generic 40 MW wind park is proposed and evaluated with real data. The wind park power production model is based on real data about power production of a Spanish wind park and a probabilistic approach to quantify fluctuations and so, power compensation needs. The hybrid wind-biomass system is analysed to obtain main hybrid system design parameters. This hybrid system can mitigate wind prediction errors and so provide a predictable source of electricity. An entire year cycle of hourly power compensations needs has been simulated deducing storage capacity, extra power needs of the biomass power plant and stand-by generation capacity to assure power compensation during critical peak hours with acceptable reliability. (author)

  20. Thermophotovoltaic Arrays for Electrical Power Generation

    Energy Technology Data Exchange (ETDEWEB)

    Sarnoff Corporation

    2003-11-18

    Sarnoff has designed an integrated array of thermophotovoltaic (TPV) cells based on the In(Al)GaAsSb/GaSb materials system. These arrays will be used in a system to generate electrical power from a radioisotope heat source that radiates at temperatures from 700 to 1000 C. Two arrays sandwich the slab heat source and will be connected in series to build voltage. Between the arrays and the heat source is a spectral control filter that transmits above-bandgap radiation and reflects below-bandgap radiation. The goal is to generate 5 mW of electrical power at 3 V from a 700 C radiant source. Sarnoff is a leader in antimonide-based TPV cell development. InGaAsSb cells with a bandgap of 0.53 eV have operated at system conversion efficiencies greater than 17%. The system included a front-surface filter, and a 905 C radiation source. The cells were grown via organo-metallic vapor-phase epitaxy. Sarnoff will bring this experience to bear on the proposed project. The authors first describe array and cell architecture. They then present calculated results showing that about 80 mW of power can be obtained from a 700 C radiator. Using a conservative array design, a 5-V output is possible.

  1. Aging assessment of large electric motors in nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Villaran, M.; Subudhi, M. [Brookhaven National Lab., Upton, NY (United States)

    1996-03-01

    Large electric motors serve as the prime movers to drive high capacity pumps, fans, compressors, and generators in a variety of nuclear plant systems. This study examined the stressors that cause degradation and aging in large electric motors operating in various plant locations and environments. The operating history of these machines in nuclear plant service was studied by review and analysis of failure reports in the NPRDS and LER databases. This was supplemented by a review of motor designs, and their nuclear and balance of plant applications, in order to characterize the failure mechanisms that cause degradation, aging, and failure in large electric motors. A generic failure modes and effects analysis for large squirrel cage induction motors was performed to identify the degradation and aging mechanisms affecting various components of these large motors, the failure modes that result, and their effects upon the function of the motor. The effects of large motor failures upon the systems in which they are operating, and on the plant as a whole, were analyzed from failure reports in the databases. The effectiveness of the industry`s large motor maintenance programs was assessed based upon the failure reports in the databases and reviews of plant maintenance procedures and programs.

  2. Aging assessment of large electric motors in nuclear power plants

    International Nuclear Information System (INIS)

    Villaran, M.; Subudhi, M.

    1996-03-01

    Large electric motors serve as the prime movers to drive high capacity pumps, fans, compressors, and generators in a variety of nuclear plant systems. This study examined the stressors that cause degradation and aging in large electric motors operating in various plant locations and environments. The operating history of these machines in nuclear plant service was studied by review and analysis of failure reports in the NPRDS and LER databases. This was supplemented by a review of motor designs, and their nuclear and balance of plant applications, in order to characterize the failure mechanisms that cause degradation, aging, and failure in large electric motors. A generic failure modes and effects analysis for large squirrel cage induction motors was performed to identify the degradation and aging mechanisms affecting various components of these large motors, the failure modes that result, and their effects upon the function of the motor. The effects of large motor failures upon the systems in which they are operating, and on the plant as a whole, were analyzed from failure reports in the databases. The effectiveness of the industry's large motor maintenance programs was assessed based upon the failure reports in the databases and reviews of plant maintenance procedures and programs

  3. Next Generation Nuclear Plant Materials Research and Development Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    G. O. Hayner; E.L. Shaber

    2004-09-01

    The U.S Department of Energy (DOE) has selected the Very High Temperature Reactor (VHTR) design for the Next Generation Nuclear Plant (NGNP) Project. The NGNP will demonstrate the use of nuclear power for electricity and hydrogen production without greenhouse gas emissions. The reactor design will be a graphite moderated, helium-cooled, prismatic or pebble-bed, thermal neutron spectrum reactor that will produce electricity and hydrogen in a state-of-the-art thermodynamically efficient manner. The NGNP will use very high burn-up, low-enriched uranium, TRISO-coated fuel and have a projected plant design service life of 60 years.

  4. Health and safety impacts of nuclear, geothermal, and fossil-fuel electric generation in California. Volume 4. Radiological emergency response planning for nuclear power plants in California

    International Nuclear Information System (INIS)

    Yen, W.W.S.

    1977-01-01

    This report reviews the state of emergency response planning for nuclear power plants in California. Attention is given to the role of Federal agencies, particularly the Nuclear Regulatory Commission, in planning for both on and off site emergency measures and to the role of State and local agencies for off site planning. The relationship between these various authorities is considered. Existing emergency plans for nuclear power plants operating or being constructed in California are summarized. The developing role of the California Energy Resources Conservation and Development Commission is examined

  5. Health and safety impacts of nuclear, geothermal, and fossil-fuel electric generation in California. Volume 2. Radiological health and related standards for nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Nero, A.V.; Wong, Y.C.

    1977-01-01

    This report summarizes the status and basis of radiation protection standards, with a view to identifying how they particularly apply to nuclear power plants. The national and international organizations involved in the setting of standards are discussed, paying explicit attention to their jurisdictions and to the considerations they use in setting standards. The routine and accidental radioactive emissions from nuclear power plants are characterized, and the effect of these emissions on ambient radiation levels is discussed. The state of information on the relationship between radiation exposures and health effects is summarized.

  6. Air pollution health effects of electric power generation

    International Nuclear Information System (INIS)

    1975-11-01

    stitutt for Atomenergi (IFA) and Norsk Institutt for Luftforskning (NILU) have undertaken a joint project with the ultimate purpose of comparing the relative air pollution health effects of gas-fired, oil-fired and uranium-fueled electric power generating plants. Phase I of the project includes a literature review on pollutant emissions and their health effects. The methods which have previouously been used to compare the relative health effects are also reviewed. The radioactive effluents from nuclear power plants are tabulated and the health effects discussed on the basis of data from Hiroshima and Nagasaki, medical irradiation therapy and studies of USAEC and UKAEA employees. It is pointed out that there is no indication that chronic low-level radiation has somatic effects, and the Japanese data gives no conclusive indication of genetic effects. Background irradiation in Kerala and Guarapari and in USA is also cited. Following a brief presentation of the principal air pollutants from fossil fuels a number of studies of 'smog' incidents in the UK and USA are discussed, and a prediction equation based on multiple regression analysis is presented. Finally the methods of comparing the health effects from nuclear and fossil-fuel plants are discussed. In an appendix Lave and Freeburg's study 'Health effects of electricity generation from coal, oil and nuclear fuel' is evaluated. (JIW)

  7. Exploration of dispatch model integrating wind generators and electric vehicles

    International Nuclear Information System (INIS)

    Haque, A.N.M.M.; Ibn Saif, A.U.N.; Nguyen, P.H.; Torbaghan, S.S.

    2016-01-01

    Highlights: • A novel business model for the BRPs is analyzed. • Imbalance cost of wind generation is considered in the UC-ED model. • Smart charging of EVs is included into the UC-ED problem to mitigate the imbalance cost. • Effects of smart charging on generation cost, CO 2 emissions and total network load are assessed. - Abstract: In recent years, the share of renewable energy sources (RES) in the electricity generation mix has been expanding rapidly. However, limited predictability of the RES poses challenges for traditional scheduling and dispatching mechanisms based on unit commitment (UC) and economic dispatch (ED). This paper presents an advanced UC-ED model to incorporate wind generators as RES-based units alongside conventional centralized generators. In the proposed UC-ED model, an imbalance cost is introduced reflecting the wind generation uncertainty along with the marginal generation cost. The proposed UC-ED model aims to utilize the flexibility of fleets of plug-in electric vehicles (PEVs) to optimally compensate for the wind generation uncertainty. A case study with 15 conventional units and 3 wind farms along with a fixed-sized PEV fleet demonstrates that shifting of PEV fleets charging at times of high wind availability realizes generation cost savings. Nevertheless, the operational cost saving incurred by controlled charging appears to diminish when dispatched wind energy becomes considerably larger than the charging energy of PEV fleets. Further analysis of the results reveals that the effectiveness of PEV control strategy in terms of CO 2 emission reduction is strongly coupled with generation mix and the proposed control strategy is favored in cases where less pollutant-based plants like nuclear and hydro power are profoundly dominant.

  8. Nuclear power plants in electric power system

    International Nuclear Information System (INIS)

    Leicman, J.; Vokurka, F.

    1985-01-01

    The paper analyzes the demands placed by the power system on operating qualities of nuclear power plants with regard to the prospective tasks of nuclear power in the Czechoslovak power system. The characteristics of the operation of Czechoslovak nuclear plants are given taking into account the frequency and voltage deviations of the network, operating and control properties of nuclear power plants with WWER-440 and WWER-1000 reactors considering the technical conditions of operation, the required operating schedule of a nuclear power plant unit. For comparison, the demands are summed up of foreign power systems as are the control properties of foreign nuclear power units in regulating output, regulating delivered electric power and in emergency states of the system. Recommendations for further research and development are drawn from the data. (author)

  9. Landmarks in the development of power plant technology - electric bulbs now shine even at Itaipu

    International Nuclear Information System (INIS)

    Leiste, V.

    1997-01-01

    Power plant technology was first used in stationary electric lighting plant as erected from 1878. Many detail developments and numerous inventions -together with the commitment and pioneer spirit of engineers for a period of more than 100 years - resulted in power stations capable of generating electricity reliably with an efficiency of almost 60 per cent. (orig.) [de

  10. Big Rock Point: 35 years of electrical generation

    International Nuclear Information System (INIS)

    Petrosky, T.D.

    1998-01-01

    On September 27, 1962, the 75 MWe boiling water reactor, designed and built by General Electric, of the Big Rock Point Nuclear Power Station went critical for the first time. The US Atomic Energy Commission (AEC) and the plant operator, Consumers Power, had designed the plant also as a research reactor. The first studies were devoted to fuel behavior, higher burnup, and materials research. The reactor was also used for medical technology: Co-60 radiation sources were produced for the treatment of more than 120,000 cancer patients. After the accident at the Three Mile Island-2 nuclear generating unit in 1979, Big Rock Point went through an extensive backfitting phase. Personnel from numerous other American nuclear power plants were trained at the simulator of Big Rock Point. The plant was decommissioned permanently on August 29, 1997 after more than 35 years of operation and a cumulated electric power production of 13,291 GWh. A period of five to seven years is estimated for decommissioning and demolition work up to the 'green field' stage. (orig.) [de

  11. Solar thermal electric power generation - an attractive option for Pakistan

    International Nuclear Information System (INIS)

    Khan, N.A

    1999-01-01

    Solar Thermal Energy is being successfully used for production of electricity in few developed countries for more than 10 years. In solar Electric Generating Systems high temperature is generated by concentrating solar energy on black absorber pipe in evacuated glass tubes. This heat is absorbed and transported with the help of high temperature oil in to highly insulated heat exchanger storage tanks. They are subsequently used to produce steam that generates power through steam turbines as in standard thermal power plants. Various components involved in Solar thermal field have been developed at the Solar Systems Laboratory of College of EME, NUST Rawalpindi. It is considered as a cost effective alternate for power generation. The research has been partially sponsored by Ministry of Science and Technology under its Public Sector Development Program (PSDP) in (1996-1998). Parabolic mirror design, fabrication, polishing, installation, solar tracking, absorber pipe, glass tubes, steam generation al have been developed. This paper will cover the details of indigenous technological break through made in this direction. (author)

  12. Economic aspects of grid connected solar electricity generation

    International Nuclear Information System (INIS)

    Pharabod, F.

    1993-01-01

    Experience gained with available solar thermal technologies enlighten on options for research and development on solar electricity generation. The proposed analysis of new solar technologies concerns market, costs and profit viewpoint: - Systems under development have to fit with consumers' needs and utilities' specifications, technology is not the only item to study. - Expense headings depend on technological options and operation procedures such as size of the plant, solar only or hybrid concept. - Anticipation of revenues highly depends on direct insolation quality and on local conditions for introducing the electric power generated into the network: daily direct insolation measurements and annual local load curve are prerequisite data. Strategic advantages regarding environment and sustainable development are to be pointed out, specially in industrialized countries or for projects including financing institutions. As far as generating electric power on the grid is a major challenge in the development of a number of countries in the sun belt, cooperation between industrialized and developing countries, under the auspices of international organization, has to be promoted. (Author) 12 refs

  13. Health and safety impacts of nuclear, geothermal, and fossil-fuel electric generation in California. Volume 5. Control of population densities surrounding nuclear power plants

    International Nuclear Information System (INIS)

    Nero, A.V.; Schroeder, C.H.; Yen, W.W.S.

    1977-01-01

    In view of the requirement that the California Energy Resources Conservation and Development Commission must specify land-use/population-density control measures to be used in the vicinity of nuclear power plants being granted land use, the possible forms of such measures are examined. Since these measures must maintain population densities below Nuclear Regulatory Commission criteria, if appropriate, NRC criteria for land use and population densities are given particular attention. In addition, a preliminary comparison of the cost of possible control measures with the reduced potential for damage to the public health and safety is made, yielding the result that control measures within approximately one mile of the plant site may be justified, in certain cases, on a strictly cost-benefit basis. However, it is not clear whether controls over such a limited region would satisfy the legal mandate

  14. The effect of operational considerations on the return of electricity generation investment

    NARCIS (Netherlands)

    Lynch, Muireann A.; Shortt, Aonghus; Tol, Richard S J; O'Malley, Mark J.

    2013-01-01

    Electricity generation investment decisions are driven by the net present value (NPV) of each generation technology. The value of each technology depends, however, not only on the characteristics of the plant in question but also on the rest of the generation portfolio. Thus the correlations between

  15. Industrial DSM in a deregulated European electricity market - a case study of 11 plants in Sweden

    International Nuclear Information System (INIS)

    Trygg, Louise; Karlsson, B.G.

    2005-01-01

    In 2004 Sweden will become part of a common European electricity market. This implies that the price of electricity in Swedish will adapt to a higher European electricity price due to the increase in cross-border trading. Swedish plant is characterized as more electricity-intensive than plant on the European continent, and this, in combination with a higher European electricity price will lead to a precarious scenario. This paper studies the energy use of 11 plants in the municipality of Oskarshamn in Sweden. The aim is to show how these plants can reduce their electricity use to adapt to a European level. We have found that the plants could reduce their use of electricity by 48% and their use of energy by 40%. In a European perspective, where coal-condensing power is assumed to be the marginal production that alters as the electricity demand changes, the decrease in the use of electricity in this study leads to a reduction in global emissions of carbon dioxide of 69,000 tonne a year. Electricity generated in Sweden emits very low emissions of carbon dioxide and have thus consequently very low external cost. The freed capacity in Sweden could therefore replace electricity generated with higher external cost and as a result lower the total external cost in Europe. The emissions from the saved electricity could also be valuable within the EU emissions trading scheme, if the emissions calculation is done assuming the marginal electricity is fossil fuel based

  16. SNAP-8 electrical generating system development program

    Science.gov (United States)

    1971-01-01

    The SNAP-8 program has developed the technology base for one class of multikilowatt dynamic space power systems. Electrical power is generated by a turbine-alternator in a mercury Rankine-cycle loop to which heat is transferred and removed by means of sodium-potassium eutectic alloy subsystems. Final system overall criteria include a five-year operating life, restartability, man rating, and deliverable power in the 90 kWe range. The basic technology has been demonstrated by more than 400,000 hours of major component endurance testing and numerous startup and shutdown cycles. A test system, comprised of developed components, delivered up to 35 kWe for a period exceeding 12,000 hours. The SNAP-8 system baseline is considered to have achieved a level of technology suitable for final application development for long-term multikilowatt space missions.

  17. Water withdrawal and consumption reduction analysis for electrical energy generation system

    Science.gov (United States)

    Nouri, Narjes

    There is an increasing concern over shrinking water resources. Water use in the energy sector primarily occurs in electricity generation. Anticipating scarcer supplies, the value of water is undoubtedly on the rise and design, implementation, and utilization of water saving mechanisms in energy generation systems are becoming inevitable. Most power plants generate power by boiling water to produce steam to spin electricity-generating turbines. Large quantities of water are often used to cool the steam in these plants. As a consequence, most fossil-based power plants in addition to consuming water, impact the water resources by raising the temperature of water withdrawn for cooling. A comprehensive study is conducted in this thesis to analyze and quantify water withdrawals and consumption of various electricity generation sources such as coal, natural gas, renewable sources, etc. Electricity generation for the state of California is studied and presented as California is facing a serious drought problem affecting more than 30 million people. Integrated planning for the interleaved energy and water sectors is essential for both water and energy savings. A linear model is developed to minimize the water consumption while considering several limitations and restrictions. California has planned to shut down some of its hydro and nuclear plants due to environmental concerns. Studies have been performed for various electricity generation and water saving scenarios including no-hydro and no-nuclear plant and the results are presented. Modifications to proposed different scenarios have been applied and discussed to meet the practical and reliability constraints.

  18. Comparison of solar pond concepts for electrical power generation

    Energy Technology Data Exchange (ETDEWEB)

    Drumheller, K; Duffy, J B; Harling, O K; Knutsen, C A; McKinnon, M A; Peterson, P L; Shaffer, L H; Styris, D L; Zaworski, R

    1975-10-01

    The objectives of this study were to: (1) Identify the various solar pond concepts for electric power generation, including but not limited to: (a) nonconvective salt gradient solar pond, (b) ponds with various plastic or other membranes at suitable locations to minimize or eliminate convection, (c) ponds which are totally or partially gelled to reduce or eliminate convection, and (d) shallow convecting ponds; (2) analyze and compare the performance of these various concepts; and (3) estimate the pond cost and overall power plant system cost for each concept assuming the nonconvective gradient salt pond as the base case. The approach includes a preliminary design of several power plant systems based on solar pond concepts, and performance and economic evaluation based on these preliminary designs. (WDM)

  19. Systems studies of dual purpose electric/synthetic fuels fusion plants

    International Nuclear Information System (INIS)

    Beardsworth, E.; Powell, J.

    1975-02-01

    A reactor power plant is proposed that can meet base load electrical demand, while the remainder can generate synthetic fuels and meet intermittent electrical demands. Two principal objectives of this study are: (1) to examine how strongly various economic demand and resource factors affect the amount of installed CTR capacity, and (2) to examine what increase in CTR capacity can be expected with dual purpose electric/synthetic fuel fusion plants, and also the relative importance of the different production modes

  20. Economic aspects of electricity and industrial heat generating reactors

    International Nuclear Information System (INIS)

    Gaussens, J.; Moulle, N.; Dutheil, F.

    1964-01-01

    The economic advantage of electricity-generating nuclear stations decreases when their size decreases. However, when a counter-pressure turbine is joined on to a reactor and the residual heat can be properly used, it can be shown that fairly low capacity nuclear equipment may compete with conventional equipment under certain realistic enough conditions. The aim of this paper is to define these special conditions under which nuclear energy can be profitable. They are connected with the location and the general economic environment of the station, the pattern of the electricity and heat demands it must meet, the level of fuel and specific capital costs, nuclear and conventional. These conditions entail certain technical and economic specifications for the reactors used in this way otherwise they are unlikely to be competitive. In addition, these results are referred to the potential steam and electricity market, which leads us to examine certain uses for the heat generated by double purpose power stations; for example, to supply combined industrial plants, various types of town heating and for removal of salt from sea water. (authors) [fr

  1. The spanish electric system operation. The contribution of nuclear generation

    International Nuclear Information System (INIS)

    Duvison, M. R.; Torre, M. de la

    2009-01-01

    Operation of an electric system encloses the collection of activities which extend from affective generation dispatch to issuing instruction for network manoeuvring along with international exchange scheduling. Based on the market mechanisms that apply to energy transactions, these tasks guarantee the security of supply end consumers, which is the final goal of the System Operators actions. In Spain this function is executed by Red Electrica de Espana (REE) since 1985, after being constituted as the first Transmission and System Operator (TSO) in the world. Additionally the variations to Law 54/1997 introduced by law 17/2007 also assign REE the function of sole transmission owner in the Spanish electric system. In order to achieve the aforementioned goal, nuclear energy plays in Spain a fundamental role in electric generation thanks to its high availability rate, the predictability of its fuel recharges, its high operational reliability, its geographical location, the stability of its costs and the security of supply given by the possibility of on-site fuel storage in the power plant. (Author)

  2. Generation capacity expansion planning in deregulated electricity markets

    Science.gov (United States)

    Sharma, Deepak

    With increasing demand of electric power in the context of deregulated electricity markets, a good strategic planning for the growth of the power system is critical for our tomorrow. There is a need to build new resources in the form of generation plants and transmission lines while considering the effects of these new resources on power system operations, market economics and the long-term dynamics of the economy. In deregulation, the exercise of generation planning has undergone a paradigm shift. The first stage of generation planning is now undertaken by the individual investors. These investors see investments in generation capacity as an increasing business opportunity because of the increasing market prices. Therefore, the main objective of such a planning exercise, carried out by individual investors, is typically that of long-term profit maximization. This thesis presents some modeling frameworks for generation capacity expansion planning applicable to independent investor firms in the context of power industry deregulation. These modeling frameworks include various technical and financing issues within the process of power system planning. The proposed modeling frameworks consider the long-term decision making process of investor firms, the discrete nature of generation capacity addition and incorporates transmission network modeling. Studies have been carried out to examine the impact of the optimal investment plans on transmission network loadings in the long-run by integrating the generation capacity expansion planning framework within a modified IEEE 30-bus transmission system network. The work assesses the importance of arriving at an optimal IRR at which the firm's profit maximization objective attains an extremum value. The mathematical model is further improved to incorporate binary variables while considering discrete unit sizes, and subsequently to include the detailed transmission network representation. The proposed models are novel in the

  3. Electric power plant emissions and public health

    Energy Technology Data Exchange (ETDEWEB)

    O' Connor, A.B.; Roy, C. [Faculty of Maine Dartmouth Family Medical Residency, Fairfield, ME (United States)

    2008-02-15

    The generation of electric power is one important source of pollutants such as mercury, sulfur dioxide, nitrogen oxides, and fine particulate matter that can affect the respiratory, cardiovascular, and central nervous systems and cause pregnancy complications. But protecting people from environmental health hazards has become increasingly complex. Air pollutants are often invisible and travel many miles virtually undetected. Nurses can play a critical role in preventive strategies, as well as in the national debate on energy production and dependence on fossil fuels.

  4. Generator technology for HTGR power plants

    International Nuclear Information System (INIS)

    Lomba, D.; Thiot, D.

    1997-01-01

    Approximately 15% of the worlds installed capacity in electric energy production is from generators developed and manufactured by GEC Alsthom. GEC Alsthom is now working on the application of generators for HTGR power conversion systems. The main generator characteristics induced by the different HTGR power conversion technology include helium immersion, high helium pressure, brushless excitation system, magnetic bearings, vertical lineshaft, high reliability and long periods between maintenance. (author)

  5. Nuclear Power's Role in Generating Electricity

    National Research Council Canada - National Science Library

    Falk, Justin

    2008-01-01

    This study assesses the commercial viability of advanced nuclear technology as a means of meeting future demand for electricity by comparing the costs of producing electricity from different sources...

  6. Local CHP Plants between the Natural Gas and Electricity Systems

    DEFF Research Database (Denmark)

    Bregnbæk, Lars; Schaumburg-Müller, Camilla

    2005-01-01

    , and they contribute significantly to the electricity production. CHP is, together with the wind power, the almost exclusive distributed generation in Denmark. This paper deals with the CHP as intermediary between the natural gas system and the electricity system. In particular, the relationship between the peak hour......Local combined heat and power (CHP) plants in Denmark constitute an important part of the national energy conversion capacity. In particular they supply a large share of the district heating networks with heat. At the same time they are important consumers as seen from the gas network system...... characteristics of the electricity and gas systems will be investigated. The point is here that the two systems will tend to have peak demand during the same hours. This is the typical situation, since load is high during the same hours of the day and of the year. Moreover, the random variations in the load...

  7. 18 CFR 801.12 - Electric power generation.

    Science.gov (United States)

    2010-04-01

    ... generation. 801.12 Section 801.12 Conservation of Power and Water Resources SUSQUEHANNA RIVER BASIN COMMISSION GENERAL POLICIES § 801.12 Electric power generation. (a) Significant uses are presently being made of the waters of the basin for the generation of electric power at hydro, pumped storage, and...

  8. FEATURES OF ELECTRIC MOTOR CHOICE FOR NUCLEAR POWER PLANT TECHNOLOGICAL OBJECTS

    Directory of Open Access Journals (Sweden)

    V.V. Shevchenko

    2013-06-01

    Full Text Available Nuclear power plants remain the basic power generating enterprises for Ukraine. Execution of works on their reliability control and operating conditions optimization is therefore of current importance. Trouble-free nuclear power plant operation is a vital technical, economical, and ecological problem, a solution to which is largely specified by reliable operation of electric equipment, namely, electric motors of nuclear power plant technological process drives.

  9. Basic recognition on safety of nuclear electric power generation

    International Nuclear Information System (INIS)

    Miyazaki, Keiji

    1995-01-01

    The safety of nuclear electric power generation is not to inflict radiation damage on public. Natural radiation is about 1 mSv every year. As far as the core melting on large scale does not occur, there is not the possibility of exerting serious radiation effect to public. The way of thinking on ensuring the safety is defense in depth. The first protection is the prevention of abnormality, the second protection is the prevention of accidents, and the third protection is the relaxation of effect. As design base accidents, the loss of coolant accident due to the breakdown of inlet pipings of reactors and the breaking of fine tubes in steam generators are included. The suitability of location is evaluated. As the large scale accidents of nuclear power stations in the past, Chernobyl accident and Three Mile Island accident are explained. The features of the countermeasures to the accident in Mihama No. 2 plant are described. The countermeasures to severe accidents, namely accident management and general preventive maintenance are explained. The background of the nonconfidence feeling to nuclear electric power generation and the importance of opening information to public are shown. (K.I.)

  10. Externalities of energy use, analyzed for shipping and electricity generation

    Science.gov (United States)

    Thomson, Heather

    Energy use is central to the modern lifestyle, but producing this energy often comes at an environmental cost. The three studies in this paper look at the tradeoffs involved in energy production. The first looks at transitioning marine vessels to natural gas from current distillate fuels. While natural gas will reduce local air pollutants, such as sulfur oxides and particulate matter, the implications for greenhouse gases depend on how the natural gas is extracted, processed, distributed, and used. Applying a "technology warming potential" (TWP) approach, natural gas as a marine fuel achieves climate parity within 30 years for diesel ignited engines, though it could take up to 190 years to reach climate parity with conventional fuels in a spark ignited engine. Movement towards natural gas as a marine fuel continues to progress, and conditions exist in some regions to make a near-term transition to natural gas feasible. The second study looks at externalities associated with electricity generation. The impact on the surrounding community is one concern when siting new electricity generating facilities. A survey was conducted of residents living near an industrial scale wind turbine and a coal-fired power plant to determine their visual and auditory effects on the residents. Results concluded that respondents living near the wind turbine were in favor of the facility. They were willing to pay an average of 2.56 a month to keep the turbine in its current location. Respondents living near the coal plant were opposed to the facility. They were willing to spend 1.82 a month to have the facility removed. The third study presents a cost effectiveness analysis of three of the main fuels used for electricity generation, namely coal, natural gas, and wind. This analysis adds social costs to the private costs traditionally utilized by investors making decisions. It utilizes previous research on visual and auditory amenity and disamenity values as well as recent published

  11. The electric power engineering handbook electric power generation, transmission, and distribution

    CERN Document Server

    Grigsby, Leonard L

    2012-01-01

    Featuring contributions from worldwide leaders in the field, the carefully crafted Electric Power Generation, Transmission, and Distribution, Third Edition (part of the five-volume set, The Electric Power Engineering Handbook) provides convenient access to detailed information on a diverse array of power engineering topics. Updates to nearly every chapter keep this book at the forefront of developments in modern power systems, reflecting international standards, practices, and technologies. Topics covered include: * Electric Power Generation: Nonconventional Methods * Electric Power Generation

  12. Integrated engine-generator concept for aircraft electric secondary power

    Science.gov (United States)

    Secunde, R. R.; Macosko, R. P.; Repas, D. S.

    1972-01-01

    The integrated engine-generator concept of locating an electric generator inside an aircraft turbojet or turbofan engine concentric with, and driven by, one of the main engine shafts is discussed. When properly rated, the generator can serve as an engine starter as well as a generator of electric power. The electric power conversion equipment and generator controls are conveniently located in the aircraft. Preliminary layouts of generators in a large engine together with their physical sizes and weights indicate that this concept is a technically feasible approach to aircraft secondary power.

  13. Fuel procurement for first generation fusion power plants

    International Nuclear Information System (INIS)

    Gore, B.F.; Hendrickson, P.L.

    1976-09-01

    The provision of deuterium, tritium, lithium and beryllium fuel materials for fusion power plants is examined in this document. Possible fusion reactions are discussed for use in first generation power plants. Requirements for fuel materials are considered. A range of expected annual consumption is given for each of the materials for a 1000 megawatts electric (MWe) fusion power plant. Inventory requirements are also given. Requirements for an assumed fusion power plant electrical generating capacity of 10 6 MWe (roughly twice present U.S. generating capacity) are also given. The supply industries are then examined for deuterium, lithium, and beryllium. Methods are discussed for producing the only tritium expected to be purchased by a commercial fusion industry--an initial inventory for the first plant. Present production levels and methods are described for deuterium, lithium and beryllium. The environmental impact associated with production of these materials is then discussed. The toxicity of beryllium is described, and methods are indicated to keep worker exposure to beryllium as low as achievable

  14. Czech Republic and indicative targets of the European Union for electricity generation from renewable sources

    International Nuclear Information System (INIS)

    Sivek, Martin; Kavina, Pavel; Malečková, Veronika; Jirásek, Jakub

    2012-01-01

    In 2010, the Czech Republic was one of the states of the European Union, which met the indicative target for the share of renewable energy sources in gross electricity consumption. That year, gross electricity generation from renewable sources amounted to a total volume of 5851 GWh, which corresponds to 8.24% of gross electricity consumption in the Czech Republic in the given time period. The largest share of the total came from hydroelectric power plants (47.7%) and biomass power plants (25.8%), and a smaller share from photovoltaic power plants (10.5%), biogas power plants (8.7%) and wind farms (5.7%). Compared with 2009, the highest year-on-year growth came from photovoltaic power plants (527 GWh, 44.2%) and, as far as other renewable sources are concerned, electricity generation at hydroelectric power plants (360 GWh, 30.2%) and biogas power plants (184 GWh, 15.4%) rose more sharply as well. - Highlights: ► The Czech Republic produced 5 851 GWh of electricity from renewable sources in 2010. ► The share of renewable sources in gross electricity consumption reached 8.24%. ► The Czech Republic thus met the indicative targets of the EU for 2010. ► An increase to 13% in 2020 will require a great effort.

  15. Virtual Power Plants of Electric Vehicles in Sustainable Smart Electricity Markets

    NARCIS (Netherlands)

    M.T. Kahlen (Micha)

    2017-01-01

    markdownabstractThe batteries of electric vehicles can be used as Virtual Power Plants to balance out frequency deviations in the electricity grid. Carsharing fleet owners have the options to charge an electric vehicle's battery, discharge an electric vehicle's battery, or keep an electric vehicle

  16. Environmental costs resulting from the use of hard coal to electricity generation in Poland

    Science.gov (United States)

    Stala-Szlugaj, Katarzyna; Grudziński, Zbigniew

    2017-10-01

    In the world's fuel mix used for generating electricity, the most common fossil fuel is coal. In the EU, coal combustion and electricity generation entail the need to purchase emission allowances (EUA) whose purchase costs affect the costs of electricity generation significantly. The research described in the article shows how current market conditions shape the profitability of generating electricity from coal and how Clean Dark Spread (CDS) changes as a function of changes in energy and coal prices at the assumed levels of emission and prices of EUA allowances. The article compares the results of CDS calculations in two variants. Areas have been highlighted where prices of both coal and EUA allowances cause CDS to assume values at which the prices of generated electricity do not cover the costs of fuel (i) and CO2 emission allowances, cover all costs (ii), or constitute positive prices (iii), but still do not cover all fixed costs. With higher power plant efficiency, CO2 emissions are lower (0.722 t/MWh). The costs of purchasing fuel required to generate 1 MWh of electricity are also lower. In such case—even with relatively high prices of coal—a power plant can achieve profitability of electricity generation.

  17. Environmental costs resulting from the use of hard coal to electricity generation in Poland

    Directory of Open Access Journals (Sweden)

    Stala-Szlugaj Katarzyna

    2017-01-01

    Full Text Available In the world's fuel mix used for generating electricity, the most common fossil fuel is coal. In the EU, coal combustion and electricity generation entail the need to purchase emission allowances (EUA whose purchase costs affect the costs of electricity generation significantly. The research described in the article shows how current market conditions shape the profitability of generating electricity from coal and how Clean Dark Spread (CDS changes as a function of changes in energy and coal prices at the assumed levels of emission and prices of EUA allowances. The article compares the results of CDS calculations in two variants. Areas have been highlighted where prices of both coal and EUA allowances cause CDS to assume values at which the prices of generated electricity do not cover the costs of fuel (i and CO2 emission allowances, cover all costs (ii, or constitute positive prices (iii, but still do not cover all fixed costs. With higher power plant efficiency, CO2 emissions are lower (0.722 t/MWh. The costs of purchasing fuel required to generate 1 MWh of electricity are also lower. In such case—even with relatively high prices of coal—a power plant can achieve profitability of electricity generation.

  18. International Meeting of the Energy Technical Society in VDE. Meeting 3: Direct Drives in Production Machinery and Industrial Plants - Generators and Drives in Renewables-Fuelled Power Plants. Meeting 4: Diagnostics of Electrical Equipment. Proceedings; Internationaler ETG-Kongress 2009. Fachtagung 3: Direktantriebe in Produktionsmaschinen und Industrieanlagen - Generatoren und Antriebe in regenerativen Kraftwerken. Fachtagung 4: Diagnostik elektrischer Betriebsmittel. Vortraege

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2009-07-01

    Within the International Meeting of the Energy Technical Society in VDE, the Association for Electrical, Electronic and Information Technologies (Frankfurt/Main, Federal Republic of Germany) at 27th to 28th October, 2009 in Duesseldorf, lectures were held to the following themes: (1) Permanent magnetic driven synchronic motors with tooth coil winding; (2) Magnetical-bearing and integrated direct drives; (3) Regular direct drive systems; (4) Linear drives; (5) Energy balance and energy efficiency; (6) Permanent magnetic driven synchronous generators; (7) Double fuelled generators; (8) Drive engineering for carbon dioxide free power supply; (9) Low capacity wind power systems; (10) Control of power transmission and energy storage; (11) State of the art of the TE diagnostics; (12) Cable and cable plants; (13) Generators and motors; (14) Transformers and additional installations; (15) Switches and switchgears inclusive protectors; (15) Insulators and overhead lines.

  19. Generation capacity adequacy in interdependent electricity markets

    International Nuclear Information System (INIS)

    Cepeda, Mauricio; Finon, Dominique

    2011-01-01

    This paper deals with the practical problems related to long-term security of supply in regional electricity markets with transmission constraints. Differences between regulatory policies and market designs in terms of generation adequacy policies may distort the normal functioning of the neighboring markets, as well as the reliability of supply. We test the effect of heterogeneous regulatory design between two interdependent markets: energy-only market, price-capped market without capacity mechanisms and price-capped markets with forward capacity contracts obligation. We rely on a long-term market simulation model in system dynamics that characterizes expansion decision in a competitive regime. The results show that differences in market designs affect both price and reliability of supply in the two markets. We examine both the short and long terms effect, and how free-riding may occur where capacity adequacy policies are adopted in one market but not the other. The main finding is that the lack of harmonization between local markets in policies to ensure capacity adequacy may lead to undesirable side effects. - Research highlights: → We model the long-term dynamic of two interdependent markets. → We examine both the short and long terms effect of heterogeneous regulatory design: energy-only market, price-capped market without capacity mechanisms and price-capped markets with forward capacity contracts obligation. → Differences in market designs affect both price and reliability of supply in the two markets. → Lack of harmonization between local markets in policies to ensure capacity adequacy may lead to undesirable side effects. → Free-riding may occur where capacity adequacy policies are adopted in one market but not the other.

  20. Renewable energy sources for electricity generation in selected developed countries

    International Nuclear Information System (INIS)

    1992-05-01

    The objectives of this report are to analyze the present status and to assess the future of selected renewable energy sources (RE) other than hydropower, i.e. wind, solar, biomass, tidal and geothermal, already in use or expected to be used for electricity generation. The report focuses on grid connected technologies leaving stand-alone power plants unconsidered. This report provides recent information on environmental impacts, costs and technical potentials related to the implementation of electricity technologies using these energy sources. The study is limited to six OECD countries, i.e. Australia, the Federal Republic of Germany, Japan, Sweden, the United Kingdom and the United States of America. The situation in other OECD countries is addressed where appropriate, but no comprehensive information is provided. Nevertheless, efforts are made to determine the technical potential of the renewable energy sources for ''Rest of OECD''. The time horizons in this report are 2010 and 2030. While detailed information is provided for the period until 2010, the technical potential for 2030 is discussed only qualitatively. Scenario analysis and the design of national energy and electric systems assuming different sets of objectives and boundary conditions are outside the scope of this study. Nevertheless, the information given in this report should provide input data for such a systems analysis. All the information given in this report is based on literature surveys. Any figure given is contingent on the fact that it has appeared in a paper or a publicly available technical report. 251 refs, figs and tabs

  1. Policies to improve biomass-electricity generation in Brazil

    International Nuclear Information System (INIS)

    Coelho, Suani T.; Bolognini, Marly F.; Zylbersztajn, David

    1999-01-01

    Electricity consumption in Brazil has grown twice from 1979 to 1994 and, for the future, official forecasts estimate high risks of deficit. Brazilian generation system presents highly seasonal characteristics due to its hydroelectric origin and sugar cane origin electricity could be used as complementation for the dry period, instead of conventional thermoelectric power plants, with the corresponding environmental advantages. Nowadays, most sugar/alcohol industries in the state of Sao Paulo are energy self-sufficient and some of them already export a small electricity surplus to the grid. The potential for such surplus is significant, moreover with the introduction of more efficient technologies, but prices are not yet attractive when compared to conventional market prices, besides the existing barriers related to the current legislation. On the other hand, existing studies show that more efficient technologies become competitive when externalities are included. This paper analyses worthing methodologies, externalities-based decisions and policy mechanisms to guide governments, planners, decision-makers and managers in the correct evaluation of bioenergy use and production faced to other alternatives. (Author)

  2. The General Electric MOD-1 wind turbine generator program

    Science.gov (United States)

    Poor, R. H.; Hobbs, R. B.

    1979-01-01

    The design, fabrication, installation and checkout of MOD-1, a megawatt class wind turbine generator which generates utility grade electrical power, is described. A MOD-1/MOD-1A tradeoff study is discussed.

  3. Feasibility study: comparison of coal- and nuclear-fueled alternatives for process steam and by product electrical power generation for the E. I. Du Pont de Nemours and Company, Incorporated Plant Site, Victoria, Texas

    Energy Technology Data Exchange (ETDEWEB)

    1978-07-01

    The purpose of the study was to evaluate the technical and economic feasibility of a small, (365 MWt) nuclear reactor for supplying process steam and electricity as a replacement for energy sources using increasingly scarce natural gas or oil. The Du Pont Chemical Plant Site at Victoria, Texas, was chosen as representative of industrial installations that require sizeable amounts of process steam and electricity. For comparison purposes conventional coal-fired boilers were also evaluated. It was determined that both nuclear- and coal-based process energy supply systems are technically feasible. For the specific steam/electricity demands at the reference site, the coal-fired plant proved to be economically more attractive than the nuclear units. For an application requiring a base-loaded supply of saturated steam, utilizing full reactor capacity, the nuclear option appears competitive for coal costing $37/ton in 1978 dollars.

  4. Feasibility study: comparison of coal- and nuclear-fueled alternatives for process steam and by product electrical power generation for the PPG Industries, Incorporated Plant Site, Lake Charles, Louisiana

    Energy Technology Data Exchange (ETDEWEB)

    1978-07-01

    The purpose of the study was to evaluate the technical and economic feasibility of a small, (365 MWt) nuclear reactor for supplying process steam and electricity as a replacement for energy sources using increasingly scarce natural gas or oil. The PPG Industries, Incorporated Plant Site at Lake Charles, Louisiana, was chosen as representative of industrial installations that require sizeable amounts of process steam and electricity. For comparison purposes conventional coal-fired boilers were also evaluated. It was determined that both nuclear- and coal-based process energy supply systems are technically feasible. For the specific steam/electricity demands at the reference site, the coal-fired plant proved to be economically more attractive than the nuclear units. For an application requiring a base-loaded supply of saturated steam, utilizing full reactor capacity, the nuclear option appears competitive for coal costing $40/ton in 1978 dollars.

  5. Solar electric power generation photovoltaic energy systems

    CERN Document Server

    Krauter, Stefan CW

    2007-01-01

    Solar electricity is a viable, environmentally sustainable alternative to the world's energy supplies. In support, this work examines the various technical parameters of photovoltaic systems. It analyzes the study of performance and yield (including optical, thermal, and electrical parameters and interfaces).

  6. Performance of Generating Plant: Managing the Changes. Part 1: International availability data exchange for thermal generating plant

    Energy Technology Data Exchange (ETDEWEB)

    Stallard, G.S.; Deschaine, R. [Black and Veatch (United States)

    2008-05-15

    The WEC Committee on the Performance of Generating Plant (PGP) has been collecting and analysing power plant performance statistics worldwide for more than 30 years and has produced regular reports, which include examples of advanced techniques and methods for improving power plant performance through benchmarking. A series of reports from the various working groups was issued in 2008. This reference presents the results of Working Group 1 (WG1). WG1's primary focus is to analyse the best ways to measure, evaluate, and apply power plant performance and availability data to promote plant performance improvements worldwide. The paper explores the specific work activities of 2004-2007 to extend traditional analysis and benchmarking frameworks. It is divided into two major topics: Overview of current electric supply industry issues/trends; and, Technical Methods/Tools to evaluate performance in today's ESI.

  7. Investments into plant replacements in a deregulated electricity market

    International Nuclear Information System (INIS)

    Elsaesser, R.F.

    2004-01-01

    The amendment to the Power Energy Act in April 1998 marked the complete deregulation of the electricity market in Germany. The debate is now beginning about ways and means to ensure new capital investments safeguarding the continuity of supply. The present power plant park has been characterized by a broad mix of primary energy sources and, admittedly, by some overcapacity as well. However, any further reduction of generating capacity will be at the expense of the continuity of supply. Although electricity prices in Germany are on the rise again after a clear drop, they have not yet reached a level sufficient for new investments. Only subsidized power plants are recovering their full costs. The question is for how long our economy is going to sustain this state of affairs. The balance among the energy policy goals of continuity of supply, environmental performance, and economic efficiency has been upset. In the period up until 2020, Germany alone will require approx. 37,000 MW of new generating capacity. Renewable and decentralized technologies alone do not constitute a sufficient and reliable alternative. However, there is the matter also of the practical feasibility of building the new power plants required. No experience is as yet available with re-investment cycles in the deregulated electricity market. Options are needed for a diversified structure of primary energy sources. There must be neither political definition of generating technologies nor exaggerated goals of environmental protection and climate protection. We advocate the free system of market prices and free access to the market. Major players able to guarantee sufficient security of investments are needed to cope with the challenges ahead. New investments with a life of thirty to forty years require a modicum of stability and realism in political framework conditions. (orig.)

  8. Future of nuclear energy for electricity generation in Brazil

    International Nuclear Information System (INIS)

    Maiorino, Jose R.; Moreira, Joao M.L.; Carajlescov, Pedro

    2015-01-01

    We discuss in this paper the medium- and long- terms evolution of nuclear power in Brazil considering official governmental studies and reports prepared by research groups. The documents reviewed include the national energy balance (BEN, 2014), the short-term planning (PDEE, 2023) and long-term planning (PNE-2030) documents emitted by EPE, and studies conducted by independent institutions and researchers. The studies consider different scenarios regarding gross national product growth and institutional development for the country and conclude that nuclear power should increase its role in Brazil. The generation matrix should diversity by 2030 and 2040 with hydropower decreasing its share from today's 70 % to values between 47 and 57 %. Nuclear power is considered a viable alternative for base load electricity generation in Brazil; to reduce generation risks during dry seasons, and to facilitate the operation of the whole power generation system. The share of nuclear power may reach values between 8 % and 15 % by 2040 according to different scenarios. To meet such growth and facilitate new investments, it is necessary to change the legal framework of the sector, and allow private ownership of enterprises to build and operate nuclear power plants in the country. (author)

  9. Future of nuclear energy for electricity generation in Brazil

    Energy Technology Data Exchange (ETDEWEB)

    Maiorino, Jose R.; Moreira, Joao M.L.; Carajlescov, Pedro, E-mail: joserubens.maiorino@ufabc.edu.br, E-mail: joao.moreira@ufabc.edu.br, E-mail: pedro.carajlescov@ufabc.edu.br [Universidade Federal do ABC (CECS/UFABC), Santo Andre, SP (Brazil). Centro de Engenharia, Modelagem e Ciencias Aplicadas

    2015-07-01

    We discuss in this paper the medium- and long- terms evolution of nuclear power in Brazil considering official governmental studies and reports prepared by research groups. The documents reviewed include the national energy balance (BEN, 2014), the short-term planning (PDEE, 2023) and long-term planning (PNE-2030) documents emitted by EPE, and studies conducted by independent institutions and researchers. The studies consider different scenarios regarding gross national product growth and institutional development for the country and conclude that nuclear power should increase its role in Brazil. The generation matrix should diversity by 2030 and 2040 with hydropower decreasing its share from today's 70 % to values between 47 and 57 %. Nuclear power is considered a viable alternative for base load electricity generation in Brazil; to reduce generation risks during dry seasons, and to facilitate the operation of the whole power generation system. The share of nuclear power may reach values between 8 % and 15 % by 2040 according to different scenarios. To meet such growth and facilitate new investments, it is necessary to change the legal framework of the sector, and allow private ownership of enterprises to build and operate nuclear power plants in the country. (author)

  10. Electric Generators and their Control for Large Wind Turbines

    DEFF Research Database (Denmark)

    Boldea, Ion; Tutelea, Lucian; Rallabandi, Vandana

    2017-01-01

    The electric generator and its power electronics interface for wind turbines (WTs) have evolved rapidly toward higher reliability and reduced cost of energy in the last 40 years. This chapter describes the up-to-date electric generators existing in the wind power industry, namely, the doubly fed...

  11. Review on Automotive Power Generation System on Plug-in Hybrid Electric Vehicles & Electric Vehicles

    Directory of Open Access Journals (Sweden)

    Leong Yap Wee

    2016-01-01

    Full Text Available Regenerative braking is a function to recharge power bank on the Plug-in electric vehicles (PHEV and electric vehicles (EV. The weakness of this system is, it can only perform its function when the vehicle is slowing down or by stepping the brake foot pedal. In other words, the electricity recharging system is inconsistent, non-continuous and geography dependent. To overcome the weakness of the regenerative braking system, it is suggested that to apply another generator which is going to be parallel with the regenerative braking system so that continuous charging can be achieved. Since the ironless electricity generator has a less counter electromotive force (CEMF comparing to an ironcored electricity generator and no cogging torque. Applying the ironless electricity generator parallel to the regenerative braking system is seen one of the options which creates sustainable charging system compared to cored electricity generator.

  12. Concepts of investment risks and strategies in electricity generation

    International Nuclear Information System (INIS)

    De Joode, J.; Boots, M.G.

    2005-06-01

    This report deals with the specific investment risks in electricity generation and discusses the problems associated with energy investments in general and focus on the additional or changing risks resulting from electricity market liberalisation. The focus is on (1) risks under the control of the electricity company, and on (2) market risks, such as the risk of price changes. Ultimately, some of the approaches and strategies that enable electricity producers to counter or mitigate these risks are discussed

  13. Fundamental Electrical Design Method for Superconducting Synchronous Generators

    International Nuclear Information System (INIS)

    Maki, N

    2006-01-01

    A fundamental electrical design methodology using electrical equations for superconducting synchronous generators, taking into consideration the size of the machine components and the performance of the superconducting field winding, has been developed. A fundamental electrical design of a 70 MW superconducting generator developed as part of the Super-GM project was conducted and it was found that the design predictions were in good agreement with the test results

  14. Cost and quality of fuels for electric plants 1993

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-01

    The Cost and Quality of Fuels for Electric Utility Plants (C&Q) presents an annual summary of statistics at the national, Census division, State, electric utility, and plant levels regarding the quantity, quality, and cost of fossil fuels used to produce electricity. The purpose of this publication is to provide energy decision-makers with accurate and timely information that may be used in forming various perspectives on issues regarding electric power.

  15. Global potential for wind-generated electricity.

    Science.gov (United States)

    Lu, Xi; McElroy, Michael B; Kiviluoma, Juha

    2009-07-07

    The potential of wind power as a global source of electricity is assessed by using winds derived through assimilation of data from a variety of meteorological sources. The analysis indicates that a network of land-based 2.5-megawatt (MW) turbines restricted to nonforested, ice-free, nonurban areas operating at as little as 20% of their rated capacity could supply >40 times current worldwide consumption of electricity, >5 times total global use of energy in all forms. Resources in the contiguous United States, specifically in the central plain states, could accommodate as much as 16 times total current demand for electricity in the United States. Estimates are given also for quantities of electricity that could be obtained by using a network of 3.6-MW turbines deployed in ocean waters with depths <200 m within 50 nautical miles (92.6 km) of closest coastlines.

  16. FENCH-analysis of electricity generation greenhouse gas emissions from solar and wind power in Germany

    International Nuclear Information System (INIS)

    Hartmann, D.

    1997-01-01

    The assessment of energy supply systems with regard to the influence on climate change requires not only the quantification of direct emissions caused by the operation of a power plant. It also has to take into account indirect emissions resulting from e.g. construction and dismounting of the power plant. Processes like manufacturing the materials for building the plant, the transportation of components and the construction and maintenance of the power plant are included. A tool to determine and assess the energy and mass flows is the Life Cycle Analysis (LCA) which allows the assessment of environmental impacts related to a product or service. In this paper a FENCH (Full Energy Chain)-analysis based on a LCA of electricity production from wind and solar power plants under operation conditions typical for application its Germany is presented. The FENCH-analysis is based on two methods, Process Chain Analysis (PCA) and Input-Output-Analysis (IOA) which are illustrated by the example of an electricity generation from a wind power plant. The calculated results are shown for the cumulated (indirect and direct) Greenhouse-Gas (GHG)-emissions for an electricity production from wind and solar power plants. A comparison of the results to the electricity production from a coal fired power plant is performed. At last a comparison of 1 kWh electricity from renewable energy to 1 kWh from fossil energy carrier has to be done, because the benefits of 1 kWh electricity from various types of power plants are different. Electricity from wind energy depends on the meteorological conditions while electricity from a fossil fired power plant is able to follow the power requirements of the consumers nearly all the time. By considering the comparison of the different benefit provided the GHG-Emissions are presented. (author)

  17. Method and apparatus for steam mixing a nuclear fueled electricity generation system

    Science.gov (United States)

    Tsiklauri, Georgi V.; Durst, Bruce M.

    1996-01-01

    A method and apparatus for improving the efficiency and performance of a nuclear electrical generation system that comprises the addition of steam handling equipment to an existing plant that results in a surprising increase in plant performance. More particularly, a gas turbine electrical generation system with heat recovery boiler is installed along with a micro-jet high pressure and a low pressure mixer superheater. Depending upon plant characteristics, the existing moisture separator reheater (MSR) can be either augmented or done away with. The instant invention enables a reduction in T.sub.hot without a derating of the reactor unit, and improves efficiency of the plant's electrical conversion cycle. Coupled with this advantage is a possible extension of the plant's fuel cycle length due to an increased electrical conversion efficiency. The reduction in T.sub.hot further allows for a surprising extension of steam generator life. An additional advantage is the reduction in erosion/corrosion of secondary system components including turbine blades and diaphragms. The gas turbine generator used in the instant invention can also replace or augment existing peak or emergency power needs. Another benefit of the instant invention is the extension of plant life and the reduction of downtime due to refueling.

  18. Electricity Generation Through the Koeberg Nuclear Power Station of Eskom in South Africa

    International Nuclear Information System (INIS)

    Dladla, G.; Joubert, J.

    2015-01-01

    The poster provides information on the process of nuclear energy generation in a nuclear power plant in order to produce electricity. Nuclear energy currently provides approximately 11% of the world’s electricity needs, with Koeberg Nuclear Power Station situated in the Western Cape providing 4.4% of South Africa’s electricity needs. As Africa’s first nuclear power station, Koeberg has an installed capacity of 1910 MW of power. Koeberg’ s total net output is 1860 MW. While there are significant differences, there are many similarities between nuclear power plants and other electrical generating facilities. Uranium is used for fuel in nuclear power plants to make electricity. With the exception of solar, wind, and hydroelectric plants, all others including nuclear plants convert water to steam that spins the propeller-like blades of a turbine that spins the shaft of a generator. Inside the generator coils of wire and magnetic fields interact to create electricity. The energy needed to boil water into steam is produced in one of two ways: by burning coal, oil, or gas (fossil fuels) in a furnace or by splitting certain atoms of uranium in a nuclear energy plant. The uranium fuel generates heat through a controlled fission process fission, which is described in this poster presentation. The Koeberg Nuclear Power Station is a Pressurised water reactor (PWR). The operating method and the components of the Koeberg Power Station are also described. The nuclear waste generated at a nuclear power station is described under three headings— low-level waste, intermediate-level waste and used or spent fuel, which can be solid, liquid or gaseous. (author)

  19. Auto generation plant of Artigas landfill (Bilbao, Spain)

    International Nuclear Information System (INIS)

    Carreras, N.; Dorronsoro, J.L.

    1996-01-01

    The disposition of MSW in the landfill generates a mixture of gases or b iogas , its primary content is methane (50-60%) which has a very important energetic value, that can be very useful. In this sense, the present work point out the characteristics of the auto generation electrical plant of Artigas landfill, just like the results of the analytical study of the past two years. In this project which was partly funded by the UE, have participated Excmo. Ayuntamiento de Bilbao, EVE and CIEMAT. (Author) 6 refs

  20. Analysis of synchronous and induction generators used at hydroelectric power plant

    Science.gov (United States)

    Diniş, C. M.; Popa, G. N.; lagăr, A.

    2017-01-01

    In this paper is presented an analysis of the operating electric generators (synchronous and induction) within a small capacity hydroelectric power plant. Such is treated the problem of monitoring and control hydropower plant using SCADA systems. Have been carried an experimental measurements in small hydropower plant for different levels of water in the lake and various settings of the operating parameters.

  1. Electric Power Generation, Transmission and Distribution (NAICS 2211)

    Science.gov (United States)

    Find EPA regulatory information for electrical utilities, including coal-fired power plants. Includes links to NESHAPs for RICE, stationary combustion engines, fossil fuel waste, cooling water, effluent guidelines. Find information on the MATS rule.

  2. Applied risk analysis to the future Brazilian electricity generation matrix

    Energy Technology Data Exchange (ETDEWEB)

    Maues, Jair; Fernandez, Eloi; Correa, Antonio

    2010-09-15

    This study compares energy conversion systems for the generation of electrical power, with an emphasis on the Brazilian energy matrix. The financial model applied in this comparison is based on the Portfolio Theory, developed by Harry Markowitz. The risk-return ratio related to the electrical generation mix predicted in the National Energy Plan - 2030, published in 2006 by the Brazilian Energy Research Office, is evaluated. The increase of non-traditional renewable energy in this expected electrical generating mix, specifically, residues of sugar cane plantations and wind energy, reduce not only the risk but also the average cost of the kilowatt-hour generated.

  3. Nuclear power generation in competition with other sources for base load electricity generation

    International Nuclear Information System (INIS)

    Notari, C.; Rey, F.C.

    1996-01-01

    The latest studies performed by OECD and IAEA on the subject were analyzed in order to clarify the international context. Nuclear, gas and coal are compared. The general conclusion is that nuclear power is competitive for electricity generation considering new plants to be commissioned around year 2000. If the discount rate is 5% per annum it is considered the best option in most of the countries included in the studies. If 10% is chosen the levelized costs favour the gas option. In the Argentine case, the analysis of possible plants for the near future shows a clear advantage for the gas projects. This is mainly due to the low capital costs and low local gas prices. The possible evolution of this situation is considered: gas prices will most probably increase because they should approach the price of fuel oil or diesel oil which are used as substitutes in winter for electricity generation and the export projects to Chile and Brasil will also push prices up. The environmental aspects of the question and its influence on regulations and costs is a matter of speculation. Some countries have already penalized greenhouse gases emissions but it is not clear how and when this trend will affect local prices. (author). 4 refs., 6 tabs

  4. A small capacity co generative gas-turbine plant in factory AD 'Komuna' - Skopje (Macedonia)

    International Nuclear Information System (INIS)

    Dimitrov, Konstantin; Armenski, Slave; Tashevski, Done

    2000-01-01

    The factory AD 'Komuna' -Skopje (Macedonia), has two steam block boilers, type ST 800 for steam production for process and space heating. The factory satisfies the electricity needs from the national grid. By the use of natural gas like fuel it is possible to produce electrical energy in its own co generative gas turbine plant. In this article, a co generative plant with small-scale gas turbine for electricity production is analyzed . The gas from gas turbine have been introduce in the steam block boiler. Also, a natural gas consumption, the electricity production, total investment and payback period of investment are determined. (Authors)

  5. Modelling grid losses and the geographic distribution of electricity generation

    DEFF Research Database (Denmark)

    Østergaard, Poul Alberg

    2005-01-01

    In Denmark more than 40% of the electricity consumption is covered by geographically scattered electricity sources namely wind power and local CHP (cogeneration of heat and power) plants. This causes problems in regard to load balancing and possible grid overloads. The potential grid problems...

  6. Designing steam generators for nuclear power plants

    International Nuclear Information System (INIS)

    Hanak, D.

    1989-01-01

    The existing types, their performance, assets and shortcomings are given for vertical steam generators manufactured by Combustion Engineering and by Westinghouse, for through-flow steam generators with slight overheating of the withdrawn steam manufactured by Babcock, and for horizontally positioned WWER-440 and WWER-1000 steam generators. The steam generator for the WWER-1000 reactors of the Temelin nuclear power plant is dealt with in detail. Its design and structural materials used are given. The procedure for strength calculations of the pressure parts of the steam generator by the finite elements method, the in-service diagnostics system as well as the device for simulating corrosion phenomena in steam generators are described. (E.J.). 6 figs., 26 refs

  7. Preliminary comparative estimate of the environmental externalities of the electrical generation in Cuba

    International Nuclear Information System (INIS)

    Turtos Carbonell, L.

    1998-01-01

    Determination of the externalises associated with the electrical generation and fundamentally its atmospherically environmental impact, win greater importance nowadays, with the objective that to medium term these could be incorporated into the economy of electricity production as the surest way to reduce this impact. In the work is accomplished a comparative preliminary estimate of the externalises of the electrical generation in Cuba based in the results obtained in the External Project (Externalises of Energy) and the emissions of the domestic Power Plant. Different processes to reduce these emissions are proposed. The economic feasibility of installing Abatement Emissions Technologies based on the calculated externalises is analyzed

  8. Impact of wind generation on the operation and development of the UK electricity systems

    International Nuclear Information System (INIS)

    Strbac, Goran; Shakoor, Anser; Pudjianto, Danny; Black, Mary; Bopp, Thomas

    2007-01-01

    Although penetration of wind generation may displace a significant amount of energy produced by large conventional plant, there are issues associated with the extent to which wind generation will be able to replace the capacity and flexibility of conventional generating plant. This is important since wind power is variable, so it will be necessary to retain a significant proportion of conventional plant to ensure security of supply especially under conditions of high demand and low wind. Hence, the capacity value of wind generation will be limited as it will not be possible to displace conventional generation capacity on a ''megawatt for megawatt'' basis. Wind power is variable and not easy to predict, hence various forms of additional reserves will be needed to maintain the balance between supply and demand at all times. Additionally, if the majority of wind generation plant is located in Scotland and the North of England, reinforcement of the transmission network will be needed to accommodate the increases in the north-south flow of electricity. In this paper an assessment of the costs and benefits of wind generation on the UK electricity system is carried out, assuming different levels of wind power capacity. Overall, it is concluded that the system will be able to accommodate significant increases in wind power generation with relatively small increases in overall costs of supply, about 5% of the current domestic electricity price in case of 20% energy produced by wind power. (author)

  9. First-Generation Transgenic Plants and Statistics

    NARCIS (Netherlands)

    Nap, Jan-Peter; Keizer, Paul; Jansen, Ritsert

    1993-01-01

    The statistical analyses of populations of first-generation transgenic plants are commonly based on mean and variance and generally require a test of normality. Since in many cases the assumptions of normality are not met, analyses can result in erroneous conclusions. Transformation of data to

  10. Electrically nonconductive shield for electric equipment generating ionizing radiation

    International Nuclear Information System (INIS)

    Aitken, D.

    1979-01-01

    As a radiation protection shield there is proposed a nonconductive shield fabricated from epoxides or other plastics material and containing finely dispersed radiation absorbing metal. It is to be designed in such a way that it lies in the range of a high electric gradient in the equipment, close to the radiation-producing component. As suitable metals there are mentioned tin, tungsten, and lead resp. their oxides. As an example there is used an X-ray shielding. (RW) 891 RW/RW 892 MKO [de

  11. Food processing with electrically generated photon irradiation

    International Nuclear Information System (INIS)

    Matthews, S.M.

    1983-01-01

    A conceptual design for a portable electric food irradiation processing machine is presented and analyzed for cost assuming the required accelerators are available for $1.5 million each. It is shown that food can be processed to 1 kGy for a price of $5.98/ton

  12. Renewable energies for decentralized electricity generation

    International Nuclear Information System (INIS)

    1992-01-01

    This report deals with the influence of laws and tariffs on the production and on the transport of electricity by auto producers. Most of all, it analyzes their consequence on the development of renewable energy. This study shows that some important modifications of the laws and of the tariffs may be necessary to develop renewable energy. (TEC). 18 figs., 2 tabs

  13. Potential of Biomass Based Electricity Generation in Sri Lanka

    Directory of Open Access Journals (Sweden)

    KP Ariyadasa

    2015-12-01

    Full Text Available Biomass has attracted much attention as a primary energy source for electricity generation due to its potential to supply low cost fuel source with considerable environmental and socio-economic benefits. Despite having favorable climatic conditions to grow and use biomass for electricity generation, biomass based electricity generation in Sri Lanka is lagging behind due to many reasons. Many countries rely on the agricultural or forestry by-products or residuals as the main source of biomass for electricity generation mainly due to the comparatively low cost and sustainable supply of these by-products. Sri Lanka does not have this advantage and has to rely mainly on purposely grown biomass for electricity generation. Development of short rotation energy plantations seems to be the best option available for Sri Lanka to produce biomass for commercial scale electricity generation. The highly favorable growing conditions, availability of promising tree species and a variety of plantation management options and significant environmental and socio-economic benefits associated with energy plantation development greatly favor this option. This paper examines the potential of using plantation grown biomass as a fuel source for electricity generation in Sri Lanka.

  14. Composite electric generator equipped with steam generator for heating reactor coolant

    Energy Technology Data Exchange (ETDEWEB)

    Watabe, Masaharu; Soman, Yoshindo; Kawanishi, Kohei; Ota, Masato

    1997-08-12

    The present invention concerns a composite electric generator having coolants, as a heating source, of a PWR type reactor or a thermonuclear reactor. An electric generator driving gas turbine is disposed, and a superheater using a high temperature exhaust gas of the gas turbine as a heating source is disposed, and main steams are superheated by the superheater to elevate the temperature at the inlet of the turbine. This can increase the electric generation capacity as well as increase the electric generation efficiency. In addition, since the humidity in the vicinity of the exit of the steam turbine is reduced, occurrence of loss and erosion can be suppressed. When cooling water of the thermonuclear reactor is used, the electric power generated by the electric generator driven by the gas turbine can be used upon start of the thermonuclear reactor, and it is not necessary to dispose a large scaled special power source in the vicinity, which is efficient. (N.H.)

  15. Electricity. Hydropower imports down, coal-fired generation up

    International Nuclear Information System (INIS)

    2004-01-01

    The low water levels in the Nordic countries typical of summer 2002 continued in 2003, keeping spot prices on the Nordic electricity market high throughout the year. This second successive dry summer had a major impact on market developments. Finnish imports of electricity from Sweden and Norway ended virtually completely, and Finland became a net electricity exporter to these markets. For short periods, Finland exported more electricity westwards in 2003 than the country imported from Russia. The role of coal- fired capacity increased, and more coal was burned to generate electricity in Finland in 2003 than at any time previously

  16. Method and apparatus for improving the performance of a nuclear power electrical generation system

    Science.gov (United States)

    Tsiklauri, Georgi V.; Durst, Bruce M.

    1995-01-01

    A method and apparatus for improving the efficiency and performance a of nuclear electrical generation system that comprises the addition of steam handling equipment to an existing plant that results in a surprising increase in plant performance. More particularly, a gas turbine electrical generation system with heat recovery boiler is installed along with a high pressure and a low pressure mixer superheater. Depending upon plant characteristics, the existing moisture separator reheater (MSR) can be either augmented or done away with. The instant invention enables a reduction in T.sub.hot without a derating of the reactor unit, and improves efficiency of the plant's electrical conversion cycle. Coupled with this advantage is a possible extension of the plant's fuel cycle length due to an increased electrical conversion efficiency. The reduction in T.sub.hot further allows for a surprising extension of steam generator life. An additional advantage is the reduction in erosion/corrosion of secondary system components including turbine blades and diaphragms. The gas turbine generator used in the instant invention can also replace or augment existing peak or emergency power needs.

  17. Analysis of the energy portfolio for electricity generation

    International Nuclear Information System (INIS)

    Ramirez S, J. R.; Alonso V, G.; Esquivel E, J.

    2016-09-01

    The planning of electricity generation systems considers several factors that must be taken into account in order to design systems that are economical, reliable and sustainable. For this purpose, the Financial Portfolio Theory is applicable to the energy portfolio or the diversification of electricity generation technologies, such as is the combined cycle, wind, thermoelectric and nuclear. This paper presents an application of the Portfolio Theory to the national energy system, based on the total generation costs for each technology, which allows determining the average variance portfolio and the respective share of each of the electricity generation technologies considered, obtaining a portfolio of electricity generation with the maximum possible return for the risk taken in the investments. This paper describes the basic aspects of the Portfolio Theory and its methodology, in which matrices are implemented for the solution of the resulting Lagrange system. (Author)

  18. Light at the end of the tunnel: the Ita hydroelectric power plant open perspectives for the effective implantation of the new model for electric power generation, leaded by the private electric power industry; Luz no fim do tunel: hidroeletrica de Ita abre perspectivas para a implantacao efetiva do novo modelo de geracao de energia, liderado pela iniciativa privada

    Energy Technology Data Exchange (ETDEWEB)

    Anon

    2000-11-01

    This article analyse the importance of the Ita hydroelectric power plant for the electric power supply avoiding the reduction of the Brazilian economic growth representing a challenge for the government and the private initiative.

  19. Comparative Analysis of Pine Needles and Coal for Electricity Generation using Carbon Taxation and Emission Reductions

    Directory of Open Access Journals (Sweden)

    Dhaundiyal Alok

    2015-06-01

    Full Text Available Mitigating global climate change via emission control and taxation is promising for strengthening the economic benefits of bioenergy generation and utilization. This study examines the cost effectiveness of pine needles as an alternative fuel for off-grid electricity generation in India. We first examined the changes of prices in coal for electricity generation due to CO2 emission reductions and taxes using experimental data of gasification plants. The time value of money and depreciation scale were used to find out the real levellized cost of electricity generation of gasification plants. Then, the costs of electricity generation fuelled by pine needles and coal were estimated using the cost analysis method. Our results indicate that pine needles would have more competitive edge than coal if emission had taxed at about an emission tax INR 525.15 Mg-1 of CO2 (US$ 8.4, or higher would be needed for pine needles at a yield of 202.176 dry Mg hm-2 yr. The price of coal used for electricity generation would have significantly increased if global CO2 emission had abridged by 20% or more. However, pine needles were found a much better fuel source with an increasing yield of 5.05 Mg hm-2 yr (with respect to power generation and 2.335 Mg hm-2 yr (with respect to feedstock production.

  20. An integrated model for long-term power generation planning toward future smart electricity systems

    International Nuclear Information System (INIS)

    Zhang, Qi; Mclellan, Benjamin C.; Tezuka, Tetsuo; Ishihara, Keiichi N.

    2013-01-01

    Highlights: • An integrated model for planning future smart electricity systems was developed. • The model consists of an optimization model and an hour-by-hour simulation model. • The model was applied to Tokyo area, Japan in light of the Fukushima Accident. • Paths to best generation mixes of smart electricity systems were obtained. • Detailed hourly operation patterns in smart electricity systems were obtained. - Abstract: In the present study, an integrated planning model was developed to find economically/environmentally optimized paths toward future smart electricity systems with high level penetration of intermittent renewable energy and new controllable electric devices at the supply and demand sides respectively for regional scale. The integrated model is used to (i) plan the best power generation and capacity mixes to meet future electricity demand subject to various constraints using an optimization model; (ii) obtain detailed operation patterns of power plants and new controllable electric devices using an hour-by-hour simulation model based on the obtained optimized power generation mix. As a case study, the model was applied to power generation planning in the Tokyo area, Japan, out to 2030 in light of the Fukushima Accident. The paths toward best generation mixes of smart electricity systems in 2030 based on fossil fuel, hydro power, nuclear and renewable energy were obtained and the feasibility of the integrated model was proven

  1. Soviet steam generator technology: fossil fuel and nuclear power plants

    International Nuclear Information System (INIS)

    Rosengaus, J.

    1987-01-01

    In the Soviet Union, particular operational requirements, coupled with a centralized planning system adopted in the 1920s, have led to a current technology which differs in significant ways from its counterparts elsewhere in the would and particularly in the United States. However, the monograph has a broader value in that it traces the development of steam generators in response to the industrial requirements of a major nation dealing with the global energy situation. Specifically, it shows how Soviet steam generator technology evolved as a result of changing industrial requirements, fuel availability, and national fuel utilization policy. The monograph begins with a brief technical introduction focusing on steam-turbine power plants, and includes a discussion of the Soviet Union's regional power supply (GRES) networks and heat and power plant (TETs) systems. TETs may be described as large central co-generating stations which, in addition to electricity, provide heat in the form of steam and hot water. Plants of this type are a common feature of the USSR today. The adoption of these cogeneration units as a matter of national policy has had a central influence on Soviet steam generator technology which can be traced throughout the monograph. The six chapters contain: a short history of steam generators in the USSR; steam generator design and manufacture in the USSR; boiler and furnace assemblies for fossil fuel-fired power stations; auxiliary components; steam generators in nuclear power plants; and the current status of the Soviet steam generator industry. Chapters have been abstracted separately. A glossary is included containing abbreviations and acronyms of USSR organizations. 26 references

  2. An electricity generation planning model incorporating demand response

    International Nuclear Information System (INIS)

    Choi, Dong Gu; Thomas, Valerie M.

    2012-01-01

    Energy policies that aim to reduce carbon emissions and change the mix of electricity generation sources, such as carbon cap-and-trade systems and renewable electricity standards, can affect not only the source of electricity generation, but also the price of electricity and, consequently, demand. We develop an optimization model to determine the lowest cost investment and operation plan for the generating capacity of an electric power system. The model incorporates demand response to price change. In a case study for a U.S. state, we show the price, demand, and generation mix implications of a renewable electricity standard, and of a carbon cap-and-trade policy with and without initial free allocation of carbon allowances. This study shows that both the demand moderating effects and the generation mix changing effects of the policies can be the sources of carbon emissions reductions, and also shows that the share of the sources could differ with different policy designs. The case study provides different results when demand elasticity is excluded, underscoring the importance of incorporating demand response in the evaluation of electricity generation policies. - Highlights: ► We develop an electric power system optimization model including demand elasticity. ► Both renewable electricity and carbon cap-and-trade policies can moderate demand. ► Both policies affect the generation mix, price, and demand for electricity. ► Moderated demand can be a significant source of carbon emission reduction. ► For cap-and-trade policies, initial free allowances change outcomes significantly.

  3. Exploring utility organization electricity generation, residential electricity consumption, and energy efficiency: A climatic approach

    International Nuclear Information System (INIS)

    Craig, Christopher A.; Feng, Song

    2017-01-01

    Highlights: • Study examined impact of electricity fuel sources and consumption on emissions. • 97.2% of variability in emissions explained by coal and residential electricity use. • Increasing cooling degree days significantly related to increased electricity use. • Effectiveness of state-level energy efficiency programs showed mixed results. - Abstract: This study examined the impact of electricity generation by fuel source type and electricity consumption on carbon emissions to assess the role of climatic variability and energy efficiency (EE) in the United States. Despite high levels of greenhouse gas emissions, residential electricity consumption continues to increase in the United States and fossil fuels are the primary fuel source of electricity generation. 97.2% of the variability in carbon emissions in the electricity industry was explained by electricity generation from coal and residential electricity consumption. The relationships between residential electricity consumption, short-term climatic variability, long-term climatic trends, short-term reduction in electricity from EE programs, and long-term trends in EE programs was examined. This is the first study of its nature to examine these relationships across the 48 contiguous United States. Inter-year and long-term trends in cooling degree days, or days above a baseline temperature, were the primary climatic drivers of residential electricity consumption. Cooling degree days increased across the majority of the United States during the study period, and shared a positive relationship with residential electricity consumption when findings were significant. The majority of electricity reduction from EE programs was negatively related to residential electricity consumption where findings were significant. However, the trend across the majority of states was a decrease in electricity reduction from EE while residential electricity consumption increased. States that successfully reduced consumption

  4. Decontamination techniques for BWR power generation plant

    International Nuclear Information System (INIS)

    Yoshikawa, Susumu

    1990-01-01

    The present report describes various techniques used for decontamination in BWR power generation plants. Objectives and requirements for decontamination in BWR power plants are first discussed focusing on reduction in dose, prevention of spread of contamination, cleaning of work environments, exposure of equipment parts for inspection, re-use of decontaminated resources, and standards for decontamination. Then, the report outlines major physical, chemical and electrochemical decontamination techniques generally used in BWR power generation plants. The physical techniques include suction of deposits in tanks, jet cleaning, particle blast cleaning, ultrasonic cleaning, coating with special paints, and flushing cleaning. The chemical decontamination techniques include the use of organic acids etc. for dissolution of oxidized surface layers and treatment of secondary wastes such as liquids released from primary decontamination processes. Other techniques are used for removal of penetrated contaminants, and soft and hard cladding in and on equipment and piping that are in direct contact with radioactive materials used in nuclear power generation plants. (N.K.)

  5. Private wind powered electricity generators for industry in the UK

    Science.gov (United States)

    Thabit, S. S.; Stark, J.

    This paper investigates the impact of the provisions of the new Energy Act, 1983 on industrial wind-powered private generators of electricity and the effects of published tariffs on various industrial working patterns. Up to 30 percent savings can be achieved in annual electricity bill costs for an industrial generator/user of electricity working a single daily shift, if located in a favorable, 7 m/s mean annual wind speed regime. Variation of the availability charge between Electricity Boards about a base value of 0.70 pounds sterling/kVA was found to have insignificant (+ or - 1.3 percent) impact on total electricity bill costs. It was also shown that for industrial users of electricity, the simpler two-rate purchase terms were commercially adequate when compared with the four-rate alternative where expensive metering becomes necessary.

  6. Cost and quality of fuels for electric utility plants, 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-14

    This document presents an annual summary of statistics at the national, Census division, State, electric utility, and plant levels regarding the quantity, quality, and cost of fossil fuels used to produce electricity. Purpose of this publication is to provide energy decision-makers with accurate, timely information that may be used in forming various perspectives on issues regarding electric power.

  7. Cost and quality of fuels for electric utility plants, 1992

    Energy Technology Data Exchange (ETDEWEB)

    1993-08-02

    This publication presents an annual summary of statistics at the national, Census division, State, electric utility, and plant levels regarding the quantity, quality, and cost of fossil fuels used to produce electricity. The purpose of this publication is to provide energy decision-makers with accurate and timely information that may be used in forming various perspectives on issues regarding electric power.

  8. Compost in plant microbial fuel cell for bioelectricity generation.

    Science.gov (United States)

    Moqsud, M A; Yoshitake, J; Bushra, Q S; Hyodo, M; Omine, K; Strik, David

    2015-02-01

    Recycling of organic waste is an important topic in developing countries as well as developed countries. Compost from organic waste has been used for soil conditioner. In this study, an experiment has been carried out to produce green energy (bioelectricity) by using paddy plant microbial fuel cells (PMFCs) in soil mixed with compost. A total of six buckets filled with the same soil were used with carbon fiber as the electrodes for the test. Rice plants were planted in five of the buckets, with the sixth bucket containing only soil and an external resistance of 100 ohm was used for all cases. It was observed that the cells with rice plants and compost showed higher values of voltage and power density with time. The highest value of voltage showed around 700 mV when a rice plant with 1% compost mixed soil was used, however it was more than 95% less in the case of no rice plant and without compost. Comparing cases with and without compost but with the same number of rice plants, cases with compost depicted higher voltage to as much as 2 times. The power density was also 3 times higher when the compost was used in the paddy PMFCs which indicated the influence of compost on bio-electricity generation. Copyright © 2014 Elsevier Ltd. All rights reserved.

  9. optimization methodologies of mixed electrical generators in algeria ...

    African Journals Online (AJOL)

    ABSTRACT. This article deals of the optimization of renewable energy electric generators, for the alimentation of radio telecommunication systems. The principals' interests of this system are the independence production, and the supplying of electric energy in isolated localities. Have at one's the energetic and economic ...

  10. Storing the Electric Energy Produced by an AC Generator

    Science.gov (United States)

    Carvalho, P. Simeao; Lima, Ana Paula; Carvalho, Pedro Simeao

    2010-01-01

    Producing energy from renewable energy sources is nowadays a priority in our society. In many cases this energy comes as electric energy, and when we think about electric energy generators, one major issue is how we can store that energy. In this paper we discuss how this can be done and give some ideas for applications that can serve as a…

  11. The Environmental Impact of Electrical Power Generation: Nuclear and Fossil.

    Science.gov (United States)

    Pennsylvania State Dept. of Education, Harrisburg.

    This text was written to accompany a course concerning the need, environmental costs, and benefits of electrical power generation. It was compiled and written by a committee drawn from educators, health physicists, members of industry and conservation groups, and environmental scientists. Topics include: the increasing need for electrical power,…

  12. Comparison of two biomass-electricity generation technologies in Peninsular Malaysia using linear programming method

    International Nuclear Information System (INIS)

    Kumaran, P.; Hari, Z.; Boosroh, M.H.

    2006-01-01

    Two technologies have been considered to generate electricity using palm oil mill waste, the Empty Fruit Bunch (EFB) as power plant fuel. One technology is to build new 100% EFB fired power plants, located in the vicinity of the palm oil mill, in which the produced electricity would be connected to the national electricity grid system. The other technology is to transport all the available EFB fuel to an existing coal power station in which the EFB fuel would be blended with coal and co-fired in conventional coal power plant to produce electricity. A study intended to compare the difference between these two technologies, to obtain the same electricity generation, has been done. Linear programming software was used simulate the two technologies to generate 5% of Peninsular Malaysia's electricity demand in the year 2005. The study indicated that the co firing technology total cost is 43.7% cheaper than EFB technology and the fuel coat is competitive until transport cost reaches 78 RM/tone

  13. Electricity generation modeling and photovoltaic forecasts in China

    Science.gov (United States)

    Li, Shengnan

    With the economic development of China, the demand for electricity generation is rapidly increasing. To explain electricity generation, we use gross GDP, the ratio of urban population to rural population, the average per capita income of urban residents, the electricity price for industry in Beijing, and the policy shift that took place in China. Ordinary least squares (OLS) is used to develop a model for the 1979--2009 period. During the process of designing the model, econometric methods are used to test and develop the model. The final model is used to forecast total electricity generation and assess the possible role of photovoltaic generation. Due to the high demand for resources and serious environmental problems, China is pushing to develop the photovoltaic industry. The system price of PV is falling; therefore, photovoltaics may be competitive in the future.

  14. AIR POLLUTION: Emissions from Older Electricity Generating Units

    National Research Council Canada - National Science Library

    2002-01-01

    .... While fossil fuels-coal, natural gas, and oil-account for more than two thirds of our electricity, generating units that burn these fuels are major sources of airborne emissions that pose human...

  15. Electrostatic air filters generated by electric fields

    International Nuclear Information System (INIS)

    Bergman, W.; Biermann, A.H.; Hebard, H.D.; Lum, B.Y.; Kuhl, W.D.

    1981-01-01

    This paper presents theoretical and experimental findings on fibrous filters converted to electrostatic operation by a nonionizing electric field. Compared to a conventional fibrous filter, the electrostatic filter has a higher efficiency and a longer, useful life. The increased efficiency is attributed to a time independent attraction between polarized fibers and charged, polarized particles and a time dependent attraction between charged fibers and charged, polarized particles. The charge on the fibers results from a dynamic process of charge accumulation due to the particle deposits and a charge dissipation due to the fiber conductivity

  16. Possibilities for retrofitting of the existing thermal electric power plants using solar power technologies

    International Nuclear Information System (INIS)

    Matjanov, Erkinjon K.; Abduganieva, Farogat A.; Aminov, Zarif Z.

    2012-01-01

    Full text: Total installed electric power output of the existing thermal electric power plants in Uzbekistan is reaches 12 GW. Thermal electric power plants, working on organic fuel, produce around 88 % of the electricity in the country. The emission coefficient of CO 2 gases is 620 gram/kwph. Average electric efficiency of the thermal electric power plants is 32.1 %. The mentioned above data certifies, that the existing thermal electric power plants of Uzbekistan are physically and morally aged and they need to be retrofitted. Retrofitting of the existing thermal electric power plants can be done by several ways such as via including gas turbine toppings, by using solar technologies, etc. Solar thermal power is a relatively new technology which has already shown its enormous promise. With few environmental impacts and a massive resource, it offers a comparable opportunity to the sunniest Uzbekistan. Solar thermal power uses direct sunlight, so it must be sited in regions with high direct solar radiation. In many regions, one square km of land is enough to generate as much as 100-120 GWh of electricity per year using the solar thermal technology. This is equivalent to the annual production of a 50 MW conventional coal or gas-fired mid-load power plant. Solar thermal power plants can be designed for solar-only or for hybrid operation. Producing electricity from the energy in the sun's rays is a straightforward process: direct solar radiation can be concentrated and collected by a range of Concentrating Solar Power technologies to provide medium- to high temperature heat. This heat is then used to operate a conventional power cycle, for example through a steam turbine or a Stirling engine. Solar heat collected during the day can also be stored in liquid or solid media such as molten salts, ceramics, concrete or, in the future, phase-changing salt mixtures. At night, it can be extracted from the storage medium thereby continuing turbine operation. Currently, the

  17. The impact of financing schemes and income taxes on electricity generation costs

    International Nuclear Information System (INIS)

    Bertel, E.; Plante, J.

    2007-01-01

    Electricity generation cost estimates reported in many national and international studies provide a wealth of data to support economic assessments, and eventually to guide choices on generation sources and technologies. However, although the electricity generating cost is the criterion generally selected to present results, it is calculated by various means in different studies because the chosen approach must be relevant to the context of the specific project (private vs. stated-owned investor, regional differences...). The traditional constant-money levelized generation cost methodology is widely used by utilities, government agencies and international organisations to provide economic assessments of alternative generation options. It gives transparent and robust results, especially suitable for screening studies and international comparisons. However, the method, which is strictly economic, does not take into account all the factors influencing the choice of investors in liberalized electricity markets. In particular, it does not take into account financing schemes and income taxes which may hate a significant impact on the capital cost to be supported by the investor. The approach described below is based on the overall framework of average levelized lifetime cost evaluation, but it takes into account the financing scheme adopted by the investor and the income taxes supported by the plant operator/utility. It is similar to models which are used to analyse the economics of competing electricity generation sources in liberalized electricity markets, such as the merchant plant cash flow model adopted in the MIT study. (authors)

  18. Secondary electric power generation with minimum engine bleed

    Science.gov (United States)

    Tagge, G. E.

    1983-01-01

    Secondary electric power generation with minimum engine bleed is discussed. Present and future jet engine systems are compared. The role of auxiliary power units is evaluated. Details of secondary electric power generation systems with and without auxiliary power units are given. Advanced bleed systems are compared with minimum bleed systems. A cost model of ownership is given. The difference in the cost of ownership between a minimum bleed system and an advanced bleed system is given.

  19. Electricity generating system. [Wind/diesel/flywheel system

    Energy Technology Data Exchange (ETDEWEB)

    Moody, R.L.

    1992-02-05

    An electricity generating system is described which includes a water tank with electric heating elements connected to the water cooling system of a diesel engine which is heated by excess output of the system. Power in excess of that required by a load which is generated by a wind turbine driven generator runs up a flywheel and further excess is absorbed in the tank. A fan associated with a radiator connected to the tank may be operated to dissipate further excess power. When the load requirements exceed the output of the generators linked to the wind turbine and the flywheel the engine operates a synchronous alternator. (author).

  20. Study of thermoelectric systems applied to electric power generation

    International Nuclear Information System (INIS)

    Rodriguez, A.; Vian, J.G.; Astrain, D.; Martinez, A.

    2009-01-01

    A computational model has been developed in order to simulate the thermal and electric behavior of thermoelectric generators. This model solves the nonlinear system of equations of the thermoelectric and heat transfer equations. The inputs of the program are the thermoelectric parameters as a function of temperature and the boundary conditions, (room temperature and residual heat flux). The outputs are the temperature values of all the elements forming the thermoelectric generator, (performance, electric power, voltage and electric current generated). The model solves the equation system using the finite difference method and semi-empirical expressions for the convection coefficients. A thermoelectric electric power generation test bench has been built in order to validate and determine the accuracy of the computational model, which maximum error is lower than 5%. The objective of this study is to create a design tool that allows us to solve the system of equations involved in the electric generation process without needing to impose boundary conditions that are not known in the design phase, such as the temperature of the Peltier modules. With the computational model, we study the influence of the heat flux supplied as well as the room temperature on the electric power generated.

  1. Electricity generation devices using formic acid

    KAUST Repository

    Huang, Kuo-Wei

    2017-06-22

    The present disclosure relates generally to new forms of portable energy generation devices and methods. The devices are designed to covert formic acid into released hydrogen, alleviating the need for a hydrogen tank as a hydrogen source for fuel cell power.

  2. Microbial electricity generation in rice paddy fields: recent advances and perspectives in rhizosphere microbial fuel cells.

    Science.gov (United States)

    Kouzuma, Atsushi; Kaku, Nobuo; Watanabe, Kazuya

    2014-12-01

    Microbial fuel cells (MFCs) are devices that use living microbes for the conversion of organic matter into electricity. MFC systems can be applied to the generation of electricity at water/sediment interfaces in the environment, such as bay areas, wetlands, and rice paddy fields. Using these systems, electricity generation in paddy fields as high as ∼80 mW m(-2) (based on the projected anode area) has been demonstrated, and evidence suggests that rhizosphere microbes preferentially utilize organic exudates from rice roots for generating electricity. Phylogenetic and metagenomic analyses have been conducted to identify the microbial species and catabolic pathways that are involved in the conversion of root exudates into electricity, suggesting the importance of syntrophic interactions. In parallel, pot cultures of rice and other aquatic plants have been used for rhizosphere MFC experiments under controlled laboratory conditions. The findings from these studies have demonstrated the potential of electricity generation for mitigating methane emission from the rhizosphere. Notably, however, the presence of large amounts of organics in the rhizosphere drastically reduces the effect of electricity generation on methane production. Further studies are necessary to evaluate the potential of these systems for mitigating methane emission from rice paddy fields. We suggest that paddy-field MFCs represent a promising approach for harvesting latent energy of the natural world.

  3. External costs from electricity generation of China up to 2030 in energy and abatement scenarios

    International Nuclear Information System (INIS)

    Zhang, Qingyu; Weili, Tian; Yumei, Wei; Yingxu, Chen

    2007-01-01

    This paper presents estimated external costs of electricity generation in China under different scenarios of long-term energy and environmental policies. Long-range Energy Alternatives Planning (LEAP) software is used to develop a simple model of electricity demand and to estimate gross electricity generation in China up to 2030 under these scenarios. Because external costs for unit of electricity from fossil fuel will vary in different government regulation periods, airborne pollutant external costs of SO 2 , NO x , PM 10 , and CO 2 from fired power plants are then estimated based on emission inventories and environmental cost for unit of pollutants, while external costs of non-fossil power generation are evaluated with external cost for unit of electricity. The developed model is run to study the impact of different energy efficiency and environmental abatement policy initiatives that would reduce total energy requirement and also reduce external costs of electricity generation. It is shown that external costs of electricity generation may reduce 24-55% with three energy policies scenarios and may further reduce by 20.9-26.7% with two environmental policies scenarios. The total reduction of external costs may reach 58.2%. (author)

  4. On the possibility of generation of cold and additional electric energy at thermal power stations

    Science.gov (United States)

    Klimenko, A. V.; Agababov, V. S.; Borisova, P. N.

    2017-06-01

    A layout of a cogeneration plant for centralized supply of the users with electricity and cold (ECCG plant) is presented. The basic components of the plant are an expander-generator unit (EGU) and a vapor-compression thermotransformer (VCTT). At the natural-gas-pressure-reducing stations, viz., gas-distribution stations and gas-control units, the plant is connected in parallel to a throttler and replaces the latter completely or partially. The plant operates using only the energy of the natural gas flow without burning the gas; therefore, it can be classified as a fuelless installation. The authors compare the thermodynamic efficiencies of a centralized cold supply system based on the proposed plant integrated into the thermal power station scheme and a decentralized cold supply system in which the cold is generated by electrically driven vapor-compression thermotransformers installed on the user's premises. To perform comparative analysis, the exergy efficiency was taken as the criterion since in one of the systems under investigation the electricity and the cold are generated, which are energies of different kinds. It is shown that the thermodynamic efficiency of the power supply using the proposed plant proves to be higher within the entire range of the parameters under consideration. The article presents the results of investigating the impact of the gas heating temperature upstream from the expander on the electric power of the plant, its total cooling capacity, and the cooling capacities of the heat exchangers installed downstream from the EGU and the evaporator of the VCTT. The results of calculations are discussed that show that the cold generated at the gas-control unit of a powerful thermal power station can be used for the centralized supply of the cold to the ventilation and conditioning systems of both the buildings of the power station and the neighboring dwelling houses, schools, and public facilities during the summer season.

  5. Next Generation Nuclear Plant Materials Selection and Qualification Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    R. Doug Hamelin; G. O. Hayner

    2004-11-01

    The U.S. Department of Energy (DOE) has selected the Very High Temperature Reactor (VHTR) design for the Next Generation Nuclear Plant (NGNP) Project. The NGNP will demonstrate the use of nuclear power for electricity and hydrogen production without greenhouse gas emissions. The reactor design is a graphite-moderated, helium-cooled, prismatic or pebble bed thermal neutron spectrum reactor with an average reactor outlet temperature of at least 1000 C. The NGNP will use very high burn up, lowenriched uranium, TRISO-Coated fuel in a once-through fuel cycle. The design service life of the NGNP is 60 years.

  6. Public health hazards from electricity-producing plants.

    Science.gov (United States)

    Neyman, J

    1977-02-25

    When a new electricity-producing plant is to be built in a given locality it is natural to take into account the public health consequences of the normal operation of each type of plant contemplated. Here, the fossil-burning plants and nuclear facilities come under consideration. I have attempted to show that, in spite of the many important studies performed, there is currently no reliable methodology to estimate how many more cancer cases, and how many more heart attacks and other diseases have to be anticipated as a consequence of the normal operation of this or that type of electric generator. In part, this is because the currently available estimates of radiation effects on humans are based on extrapolations from studies of two kinds. Those of one kind may be exemplified by studies of atomic bomb casualties in Hiroshima and Nagasaki. The other kind are laboratory experiments with lower animals, frequently mice. The unreliability of both kinds of extrapolations is connected with the following circumstances: (i) The omnipresent troublesome phenomenon of competing risks. (ii) The dependence of health effects of a given noxious agent on the preexisting local pollution. (iii) The dependence of health effects not only on the "dose" of an agent, but also on the rate at which the agent is administered. (iv) The noted difficulties of making extrapolations from one mammal to another. Our obtaining reliable estimates of the public health effects of extra pollution from new industrial plants would seem to depend on a large multipollutant and multilocality epidemiological study being conducted--one requiring the cooperative effort of several governmental agencies. However, a much easier study of certain developments in the vicinity of Rocky Flats, Colorado, might provide important direct information on health phenomena as they occur in real life.

  7. Design mechanic generator under speed bumper to support electricity recourse for urban traffic light

    Science.gov (United States)

    Sabri, M.; Lauzuardy, Jason; Syam, Bustami

    2018-03-01

    The electrical energy needs for the traffic lights in some cities of developing countries cannot be achieved continuously due to limited capacity and interruption of electricity distribution, the main power plant. This issues can lead to congestion at the crossroads. To overcome the problem of street chaos due to power failure, we can cultivate to provide electrical energy from other sources such as using the bumper to generate kinetic energy, which can be converted into electrical energy. This study designed a generator mechanic that will be mounted on the bumper construction to generate electricity for the purposes of traffic lights at the crossroads. The Mechanical generator is composed of springs, levers, sprockets, chains, flywheel and customize power generator. Through the rotation of the flywheel, we can earned 9 Volt DC voltage and electrical current of 5.89 Ampere. This achievement can be used to charge the accumulator which can be used to power the traffic lights, and to charge the accumulator capacity of 6 Ah, the generator works in the charging time for 1.01 hours.

  8. Competitiveness and Carbon Dioxide Emissions of Potential Electricity Generating Options in Croatia

    International Nuclear Information System (INIS)

    Feretic, D.

    2008-01-01

    As part of analysis of options needed to generate additional 6-8 TWh of electrical energy for Croatian consumers by the end of next decade, a comparison between natural gas combined cycle plants jointly with wind electricity generator and nuclear power plants has been performed. The choice is a real challenge, but it is logical that the criteria for optimal option are maximal net cash flow and minimal carbon dioxide emission. Since the comparison has to include analysis of discounted net cash flow during plants operating period (including total life time period and period of most insensitive capital return) and since foreseen potential long term fuel cost variations (gas, uranium concentrate and uranium enrichment) contain substantial uncertainties, the best method is to calculate discounted net cash flow with probabilistic method. Prognosis for long term nuclear fuel cycle and gas costs is included in the analyses. Results, obtained in form of probabilistic distributions, showed that selection of option with nuclear plant would doubtlessly result in higher net cash flow for the investor, and of course, in lower CO 2 emissions. Effect of plant selection to net cash flow and CO 2 emissions is additionally analyzed by comparing systems containing wind and gas plants versus system with gas plants only. The difference is less pronounced in case when wind generators have low capacity factors (similar to experienced for wind plants already operating on Adriatic coast). (author)

  9. Outline of principle of design construction of demolished concrete from electric power plant

    International Nuclear Information System (INIS)

    Takahashi, Tomohiko; Sakagami, Takeharu; Inagaki, Hirokazu; Morozumi, Hironori; Muranaka, Kenji

    2005-01-01

    'The principle of design construction of recycled demolished concrete from electric power plant' (a plan) is going to be published by TSCE Concrete Committee in 2005. The abstract of the above principle is described. A large amount of demolished concrete is generated by decommissioning of atomic power plant. About 450,000 to 500,000t of concrete with small radiation level per an atomic power plant will be generated. This report included decommissioning of Tokai power plant, characteristics of subject of demolished concrete, the recycled demolished concrete, fresh conditions of the recycled demolished concrete, the strength, deformation properties, durability, alkali silica reactivity of them and control measurement. (S.Y.)

  10. Flexible use of electricity in heat-only district heating plants

    Directory of Open Access Journals (Sweden)

    Erik Trømborg

    2017-01-01

    Full Text Available European energy systems are in a period of significant transition, with the increasing shares of variable renewable energy (VRE and less flexible fossil-based generation units as predominant factors. The supply-side changes are expected to cause large short-term electricity price volatility. More frequent periods of low electricity prices may mean that electric use in flexible heating systems will become more profitable, and such flexible heating systems may, in turn, improve the integration of increasing shares of VRE. The objective of this study is to analyze the likely future of Nordic electricity price levels and variations and how the expected prices might affect the use of electricity and thermal storage in heat-only district heating plants. We apply the North European energy market model Balmorel to provide scenarios for future hourly electricity prices in years with normal, high, and low inflow levels to the hydro power system. The simulation tool energyPRO is subsequently applied to quantify how these electricity price scenarios affect the hourly use of thermal storage and individual boilers in heat-only district heating plants located in Norway. The two studied example plants use wood chips or heat pump as base load representing common technologies for district heating in Norway. The Balmorel results show that annual differences in inflow is still a decisive factor for Norwegian and Nordic electricity prices in year 2030 and that short-term (daily price variability is expected to increase. In the plant-level simulations, we find that tank storage, which is currently installed in only a few district heating plants in Norway, is a profitable flexibility option that will significantly reduce the use of fossil peak load in both biomass and heat-pump-based systems. Installation of an electric boiler in addition to tank storage is profitable in the heat pump system due to the limited capacity of the heat pump. Electricity will hence, to a

  11. Fuel prices, emission standards, and generation costs for coal vs natural gas power plants.

    Science.gov (United States)

    Pratson, Lincoln F; Haerer, Drew; Patiño-Echeverri, Dalia

    2013-05-07

    Low natural gas prices and stricter, federal emission regulations are promoting a shift away from coal power plants and toward natural gas plants as the lowest-cost means of generating electricity in the United States. By estimating the cost of electricity generation (COE) for 304 coal and 358 natural gas plants, we show that the economic viability of 9% of current coal capacity is challenged by low natural gas prices, while another 56% would be challenged by the stricter emission regulations. Under the current regulations, coal plants would again become the dominant least-cost generation option should the ratio of average natural gas to coal prices (NG2CP) rise to 1.8 (it was 1.42 in February 2012). If the more stringent emission standards are enforced, however, natural gas plants would remain cost competitive with a majority of coal plants for NG2CPs up to 4.3.

  12. Managing intermittent energy for generating electricity on islands

    International Nuclear Information System (INIS)

    Mahiou, Bernard

    2013-01-01

    France's 'electric islands' are the overseas departments and Corsica that have small, isolated grids in 'zones not interconnected' (ZNI) with the continental grid. What characterizes them is the strong growth of consumption and the quite high cost of electricity, the latter heavily subsidized through arrangements under the legal obligation to 'contribute to the public service of electricity'. Renewable, intermittent forms of energy (especially photovoltaic) have grown exponentially on these islands since 2008 thanks to the backing of public policies for setting objectives, tax exemptions, and the rates for purchasing the electricity thus generated. Owing to several experiments under way, the ZNIs have become laboratories for anticipating the future difficulties that interconnected electricity grids will have to handle once the share of renewable, intermittent electricity will have risen significantly in the energy mix

  13. Least cost analysis of Belarus electricity generation system with focus on nuclear option

    International Nuclear Information System (INIS)

    Mikhalevich, A.; Yakushau, A.

    2004-01-01

    A basic feature of the Belarus electricity system is that about 50% of the installed power capacity is used to produce heat for the central heating supply system. The Republic has one of the most developed districts heating system in Europe. The installation started in 1930, and developed very fast after 1945. Co-generation of electricity and thermal energy in central power plants has played a fundamental role in the local economy. Presently, Belarus electricity generation system includes: Total installed capacities of condensing turbines 3665 MW; Total installed capacities of co-generation turbines 3889 MW. It is expected that in 2020 in accordance with electricity demand forecast peak load demand will be equaled approximately 9500 MW. Taking into account that operation time of 60 % existent co-generation turbine and 70 % of condensing turbine can be extended up to 2020 during the period 2005 - 2020 it is necessity to install about 1500 MW of new co-generation units and about 2000 MW of condensing turbines. To select the least cost scenario for electricity generation system expansion improved computer code WASP-IV for Windows had been used. As far code WASP-IV do not allow finding out optimal solution for electricity generation system with high share of co-generation directly the methodology of application of this program for this case had been developed. Methodology is based on utilization of code WASP-IV for simulation condensing turbines and module BALANCE for modeling co-generation part of the system. The scenarios for the electricity system expansion plan included only conventional technologies. Presently, the works connected with the preparedness for NPP construction in the Republic including site survey for NPP are being carried out. The first stage of siting process according to the IAEA classification has been completed. It was based on a set of criteria answered to A Safety Guide of the IAEA Site Survey for Nuclear Power Plants and requirements to be

  14. Proposal of electric power generation from generators to water edge in the region of Sarapiqui

    International Nuclear Information System (INIS)

    Rodriguez Fallas, Cindy Veronica

    2013-01-01

    A proposed electric power generation is developed from generators to water edge in the region of Sarapiqui. The environmental characteristics, such as the hydrological network, hydrogeology, soil type, life zones, climatology, precipitation, temperature, evapotranspiration and water supply and demand, of rivers crossed by basin in the region of Sarapiqui, are determined by bibliographic consultations to implement the proposal. The most recent production statistics of the electric subsector of Costa Rica are described to reveal the growing annual demand and need for satisfaction. The zone of Sarapiqui is diagnosed as the right place to allow the generation of electric power from generators to water edge [es

  15. Heat Driven Acoustic Power Source Coupled to an Electric Generator

    OpenAIRE

    Hofler, Thomas J.

    1999-01-01

    Patent The electricity generating engine has modest efficiency, but may be attractive in remote applications where highreliability or low cost or low environmental noise or solar powering is important. The generator is likely to be most attractive in capacities of a few kW to below 100 W where a tiny engine would be impractical using other technologies.

  16. Expanding exports, increasing smog : Ontario Power Generation's and Hydro One's strategies to continue coal-fired electricity generation in Ontario

    International Nuclear Information System (INIS)

    Gibbons, J.

    2002-06-01

    The production of coal-fired electricity increased by approximately 150 per cent in Ontario between 1995 and 2000. As a result, the smog-causing emissions generated by the five coal-fired power plants operated by Ontario Power Generation caused an increase in smog and worsened air quality in the province as well as affecting air quality as far afield as the Atlantic provinces. Between 2002 and 2005, it is expected that the Pickering and Bruce nuclear plants will be returned to service, making the electricity generated by the coal plants surplus to Ontario's needs. Increasing this surplus are the planned natural gas generating stations. Ontario Power Generation is planning on using this surplus to export it to the United States rather than phasing out its reliance on coal. The increase in exports to the United States Northeast and Midwest is planned with Hydro One, already busy increasing its transmission capacity to the United States by 1,000 megawatt (MW). This plan involves laying 975 MW submarine cable from the Nanticoke Generating Station (operated by Ontario Power Generation) under Lake Erie to Pennsylvania, Ohio, or both states. At the moment, the exports are constrained by the government emissions limits imposed by the Ontario government on sulphur dioxide and nitrogen oxides. This constraint could be removed if Ontario Power Generation decides to pay further for pollution controls for sulphur dioxide and nitrogen oxides at its coal stations. Unfortunately, increasing the exports would also result in emissions increases for 28 other uncapped pollutants such as lead, mercury and arsenic. The author recommended that the Ontario government ban non-emergency coal-fired electricity exports to improve air quality in the province. refs., 8 figs

  17. Generation Companies’ Operative Strategies in the Spot Electricity Market

    Directory of Open Access Journals (Sweden)

    Tovar-Hernández J.H.

    2012-07-01

    Full Text Available In traditional regulation the obligation to meet the consumer demand was assumed, this guaranteed to generation companies the full recovery of their costs. However, in order to achieve greater efficiency, reduce the price of electricity, meet the continuously growing electricity consumption, and equalize prices in different regions, a new structure of the electricity industry has been created, where electric energy is traded through a market. Generation company’s future cash flows depend on day to day market participation, in order to satisfy all of their financial and economic requirements. In this paper, future cash flows required to fulfill with economic and financial commitments by a generation company immerse in this new market structure are studied. For this purpose, future cash flows are considered to be dependent on a single asset: electricity. Several scenarios with different fuel prices are generated in order to estimate the generation company’s future cash flows. The response of the competing generation companies is taken into account at each scenario. The fuel price changes are modelled using a concurrent binary tree.

  18. Electric Power Generation from Low to Intermediate Temperature Resourcces

    Energy Technology Data Exchange (ETDEWEB)

    Gosnold, William [Univ. of North Dakota, Grand Forks, ND (United States); Mann, Michael [Chemical Engineering Department, University of North Dakota, Grand Forks, ND (United States); Salehfar, Hossein [Univ. of North Dakota, Grand Forks, ND (United States)

    2017-03-20

    The UND-CLR Binary Geothermal Power Plant was a collaborative effort of the U.S. Department of Energy (DOE), Continental Resources, Inc. (CRL), Slope Electric Cooperative (SEC), Access Energy, LLC (AE), Basin Electric Cooperative (BEC), Olson Construction, the North Dakota Industrial Commission Renewable Energy Council (NDIC-REC), the North Dakota Department of Commerce Centers of Excellence Program (NDDC-COE), and the University of North Dakota (UND). The primary objective of project was to demonstrate/test the technical and economic feasibility of generating electricity from non-conventional, low-temperature (90 ºC to 150 °C) geothermal resources using binary technology. CLR provided the access to 98 ºC water flowing at 51 l s-1 at the Davis Water Injection Plan in Bowman County, ND. Funding for the project was from DOE –GTO, NDIC-REC, NDD-COE, and BEC. Logistics, on-site construction, and power grid access were facilitated by Slope Electric Cooperative and Olson Construction. Access Energy supplied prototype organic Rankine Cycle engines for the project. The potential power output from this project is 250 kW at a cost of $3,400 per kW. A key factor in the economics of this project is a significant advance in binary power technology by Access Energy, LLC. Other commercially available ORC engines have efficiencies 8 to 10 percent and produce 50 to 250 kW per unit. The AE ORC units are designed to generate 125 kW with efficiencies up to 14 percent and they can be installed in arrays of tens of units to produce several MW of power where geothermal waters are available. This demonstration project is small but the potential for large-scale development in deeper, hotter formations is promising. The UND team’s analysis of the entire Williston Basin using data on porosity, formation thicknesses, and fluid temperatures reveals that 4.0 x 1019 Joules of energy is available and that 1.36 x 109 MWh of power could be produced using ORC binary power plants. Much of the

  19. Modernization of the Electric Power Systems (transformers, rods and switches) in the Laguna Verde Nuclear Power Plant (Mexico)

    International Nuclear Information System (INIS)

    Gonzalez Solarzano, J. J.; Gabaldon Martin, M. A.; Pallisa Nunez, J.; Florez Ordeonez, A.; Fernandez Corbeira, A.; Prieto Diez, I.

    2010-01-01

    Description of the changes made in the Electric Power Systems as a part of the power increase project in the Laguna Verde Nuclear Power Plant (Mexico). The main electrical changes to make, besides the turbo group, are the main generation transformers, the isolated rods and the generation switch.

  20. Achieving 33% renewable electricity generation by 2020 in California

    International Nuclear Information System (INIS)

    Walmsley, Michael R.W.; Walmsley, Timothy G.; Atkins, Martin J.

    2015-01-01

    This paper investigates the impacts of California, USA reaching its renewable electricity target of 33%, excluding large hydro, by 2020, which is set out in the state's RPS (Renewable Portfolio Standard). The emerging renewable electricity mix in California and surrounding states which form the WECC (Western Electricity Coordination Council) is analysed using the CEPA (Carbon Emission Pinch Analysis) and EROI (Energy Return on Energy Invested) methodologies. The reduction in emissions with increased renewables is illustrated and the challenge of maintaining high EROI levels for renewable generation is examined for low and high electricity demand growth. Results demonstrate that wind and solar PV collectively form an integral part of California reaching the 33% renewables target by 2020. Government interventions of tax rebates and subsidies, net electricity metering and a four tiered electricity price have accelerated the uptake of electricity generation from wind and solar PV. Residential uptake of solar PV is also reducing overall California electricity grid demand. Emphasis on new renewable generation is stimulating development of affordable wind and solar technology in California which has the added benefit of enhancing social sustainability through improved employment opportunities at a variety of technical levels. - Highlights: • CA (California, USA) aims to achieve 33% renewable electricity sales by 2020. • Carbon Emission Pinch Analysis is applied to the case study of CA. • Energy Return on Energy Invested analysis shows impacts of renewable energy uptake. • Solar PV and wind are the most cost and energy efficiency renewable resources in CA. • State government intervention is needed to reach the 33% renewable electricity goal.

  1. Use of plant woody species electrical potential for irrigation scheduling.

    Science.gov (United States)

    Ríos-Rojas, Liliana; Morales-Moraga, David; Alcalde, José A; Gurovich, Luis A

    2015-01-01

    The electrical response of plants to environmental stimuli can be measured and quantitatively related to the intensity of several stimulating sources, like temperature, solar radiation, soil water content, evapotranspiration rates, sap flow and dendrometric cycles. These relations can be used to assess the influence of different environmental situations on soil water availability to plants, defined as a steady state condition between leaf transpirative flow and soil water flow to plant roots. A restricted soil water flow due to soil dryness can trigger water stress in plants, if the atmospheric evaporative demand is high, causing partial stomata closure as a physiological response to avoid plant dehydration; water stressed and unstressed plants manifest a differential electrical response. Real time plant electrical response measurements can anticipate actions that prevent the plant reaching actual stress conditions, optimizing stomata gas exchange and photosynthetic rates. An electrophysiological sensor developed in this work, allows remote real-time recording information on plant electrical potential (EP) in the field, which is highly related to EP measurements obtained with a laboratory Keithley voltmeter sensor used in an highly controlled experimental setup. Our electrophysiological sensor is a wireless, autonomous devise, which transmits EP information via Internet to a data server. Using both types of sensors (EP electrodes with a Keithley voltmeter and the electrophysiological sensor), we measured in real time the electrical responses of Persea americana and Prunus domestica plants, to induced water deficits. The differential response for 2 scenarios: irrigation and water restriction is identified by a progressive change in slope on the daily maximal and minimal electric signal values in stressed plants, and a zero-slope for similar signals for well-watered plants. Results show a correspondence between measured signals obtained by our electrophysiological

  2. Electricity generation: options for reduction in carbon emissions.

    Science.gov (United States)

    Whittington, H W

    2002-08-15

    Historically, the bulk production of electricity has been achieved by burning fossil fuels, with unavoidable gaseous emissions, including large quantities of carbon dioxide: an average-sized modern coal-burning power station is responsible for more than 10 Mt of CO(2) each year. This paper details typical emissions from present-day power stations and discusses the options for their reduction. Acknowledging that the cuts achieved in the past decade in the UK CO(2) emissions have been achieved largely by fuel switching, the remaining possibilities offered by this method are discussed. Switching to less-polluting fossil fuels will achieve some measure of reduction, but the basic problem of CO(2) emissions continues. Of the alternatives to fossil fuels, only nuclear power represents a zero-carbon large-scale energy source. Unfortunately, public concerns over safety and radioactive waste have still to be assuaged. Other approaches include the application of improved combustion technology, the removal of harmful gases from power-station flues and the use of waste heat to improve overall power-station efficiency. These all have a part to play, but many consider our best hope for emissions reduction to be the use of renewable energy. The main renewable energy contenders are assessed in this paper and realistic estimates of the contribution that each could provide are indicated. It appears that, in the time-scale envisaged by planners for reduction in CO(2) emission, in many countries renewable energy will be unlikely to deliver. At the same time, it is worth commenting that, again in many countries, the level of penetration of renewable energy will fall short of the present somewhat optimistic targets. Of renewable options, wind energy could be used in the short to medium term to cover for thermal plant closures, but for wind energy to be successful, the network will have to be modified to cope with wind's intermittent nature. Globally, hydroelectricity is currently the

  3. Projected costs of nuclear and conventional base load electricity generation in some IAEA Member States

    International Nuclear Information System (INIS)

    1990-09-01

    The cost of nuclear and conventional electricity is one of the most important parameters for power system planning, and in particular for decisions on base load power projects. This study reviews the projected levelized electricity generation costs of the base load power generation options expected to be available in the medium term, using an agreed common economic methodology. Cost projections were obtained and evaluated for nuclear and fossil fuelled (mainly coal-fired) plants that could be commissioned in the mid- to late 1990s in 10 IAEA Member States. 27 refs, figs and tabs

  4. Added value by rule IEC61850. Modernizing the electrical protection of Gundremmingen nuclear power plant

    International Nuclear Information System (INIS)

    Hoetzel, A.; Willems, D.; Maier, K.L.; Herrmann, H.J.; Einsiedler, G.

    2006-01-01

    After many years in operation the large power plant generating units B and C at Gundremmingen nuclear power plant are due for inspection and maintenance, which also requires modernizing the electrical protection. Unlike the construction of new power plants, additional constraints apply to modernization in existing plants. The new solution has to fit as seamlessly as possible into the existing units, such as signaling systems with their multitude of signaling contacts and printers, or the connection to the power plant automation system. Apart from purely technical requirements, economic factors such as short standstill times, limited budgets or phased conversions also influence the choice of a suitable solution. Planning, construction and commissioning of the electrical generating unit protection was implemented by the Secondary Systems Technology Center, a technical department of RWE-Rhein-Ruhr Netzservice GmbH, in coordination with the operator. (orig.)

  5. Electricity generation in the world and Ukraine: Current status and future developments

    Directory of Open Access Journals (Sweden)

    Alexander Zvorykin

    2017-11-01

    Full Text Available Electricity generation is the key factor for advances in industry, agriculture, technology and the level of living. Also, strong power industry with diverse energy sources is very important for country independence. In general, electricity can be generated from: 1 non-renewable energy sources such as coal, natural gas, oil, and nuclear; and 2 renewable energy sources such as hydro, biomass, wind, geothermal, solar, and wave power. However, the major energy sources for electricity generation in the world are: 1 thermal power – primarily using coal (~40% and secondarily natural gas (~23%; 2 “large” hydro power plants (~17% and 3 nuclear power from various reactor designs (~11%. The rest of the energy sources for electricity generation is from using oil (~4% and renewable sources such as biomass, wind, geothermal and solar (~5%, which have just visible impact in selected countries. In addition, energy sources, such as wind and solar, and some others, like tidal and wave-power, are intermittent from depending on Mother Nature. And cannot be used alone for industrial electricity generation. Nuclear power in Ukraine is the most important source of electricity generation in the country. Currently, Ukrainian Nuclear Power Plants (NPPs generate about 45.5% of the total electricity followed with coal generation ‒ 38%, gas generation 9.6% and the rest is based on renewable sources, mainly on hydro power plants – 5.9%. Nuclear-power industry is based on four NPPs (15 Pressurized Water Reactors (PWRs including the largest one in Europe ‒ Zaporizhzhya NPP with about 6,000 MWel gross installed capacity. Two of these 15 reactors have been built and put into operation in 70-s, ten in 80-s, one in 90-s and just two in 2004. Therefore, based on an analysis of the world power reactors in terms of their maximum years of operation (currently, the oldest reactors are ~45-year old several projections have been made for future of the nuclear-power industry

  6. Approaches for controlling air pollutants and their environmental impacts generated from coal-based electricity generation in China.

    Science.gov (United States)

    Xu, Changqing; Hong, Jinglan; Ren, Yixin; Wang, Qingsong; Yuan, Xueliang

    2015-08-01

    This study aims at qualifying air pollutants and environmental impacts generated from coal-based power plants and providing useful information for decision makers on the management of coal-based power plants in China. Results showed that approximately 9.03, 54.95, 62.08, and 12.12% of the national carbon dioxide, sulfur dioxide, nitrogen oxides, and particulate matter emissions, respectively, in 2011were generated from coal-based electricity generation. The air pollutants were mainly generated from east China because of the well-developed economy and energy-intensive industries in the region. Coal-washing technology can simply and significantly reduce the environmental burden because of the relativity low content of coal gangue and sulfur in washed coal. Optimizing the efficiency of raw materials and energy consumption is additional key factor to reduce the potential environmental impacts. In addition, improving the efficiency of air pollutants (e.g., dust, mercury, sulfur dioxide, nitrogen oxides) control system and implementing the strict requirements on air pollutants for power plants are important ways for reducing the potential environmental impacts of coal-based electricity generation in China.

  7. Evaluation of Glare at the Ivanpah Solar Electric Generating System

    Energy Technology Data Exchange (ETDEWEB)

    Ho, Clifford K. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Sims, Cianan [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Christian, Joshua Mark [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2014-07-01

    The Ivanpah Solar Electric Generating System (ISEGS), located on I - 15 about 40 miles (60 km) south of Las Vegas, NV, consists of three power towers 459 ft (140 m) tall and over 170,000 reflective heliostats with a rated capacity of 390 MW. Reports of glare from the plant have been submitted by pilots and air traffic controllers and recorded by the Aviation Safety Reporting System and the California Energy Commission since 2013. Aerial and ground - based surveys of the glare were conducted in April, 2014, to identify the cause and to quantify the irradiance and potential ocular impact s of the glare . Results showed that the intense glare viewed from the airspace above ISEGS was caused by he liostats in standby mode that were aimed to the side of the receiver. Evaluation of the glare showed that the retinal irradiance and subtended source angle of the glare from the heliostats in standby were sufficient to cause significant ocular impact (pot ential for after - image) up to a distance of %7E6 miles (10 km), but the values were below the threshold for permanent eye damage . Glare from the receivers had a low potential for after - image at all ground - based monitoring locations outside of the site bound aries. A Letter to Airmen has been issued by the Federal Aviation Administration to notify pilots of the potential glare hazards. Additional measures to mitigate the potential impacts of glare from ISGES are also presented and discussed. This page intentionally left blank

  8. US central station nuclear electric generating units: significant milestones

    International Nuclear Information System (INIS)

    1979-09-01

    Listings of US nuclear power plants include significant dates, reactor type, owners, and net generating capacity. Listings are made by state, region, and utility. Tabulations of status, schedules, and orders are also presented

  9. Design of laser source for electricity generation

    International Nuclear Information System (INIS)

    Nasrullah, K.; Mariun, N.; Yeak, J.

    2000-01-01

    New sources of energy are being investigated to meet socioeconomic needs and other trivialities. Systems employing nuclear, thermal, hydro, solar, volcano, tidal and wind power generation techniques already exist. This work describes our attempt to utilize the off-planet charge to store in super electrolytic batteries or super capacitors. The electrostatic charge on clouds can be shifted to earth through a conductive air plasma channel created by appropriate high power Q-switched and mode-locked laser. The pulsed laser may create a conducting path consisting of ionised air particles from earth to some upper atmosphere. An antenna connected to anode of the super cell or positive terminal of the super capacitor will accumulate and store this charge for future use. The cathode of the battery or negative terminal of the super capacitor may be connected to earth to complete the circuit. A large number of such series and parallel units constitute a super battery or super capacitor bank system that can be connected to the national grid through DC to AC converters (DAC) and step-up transformers. According to published data, the lightning strokes may consist of 10 - 40 strokes of 2 - 80 pts duration separated in time by 6 - 530 ms intervals. The total time elapsed in lightning strike may last as long as 1 second. Due to tropical dependence, further detailed work is required to be done on lightning regarding its temporal and spatial profiles to develop a reasonable model to explore transient charging characteristics of storage devices. Experimental work in respect of laser-inducted charge-shifting, transient charging capabilities of super storage batteries or super capacitors is underway. (Author)

  10. Hybrid Test Bed of Wind Electric Generator with Photovoltaic Panels

    OpenAIRE

    G.D.Anbarasi Jebaselvi; S.Paramasivam

    2014-01-01

    Driven by the increasing costs of power production and decreasing fossil fuel reserves with the addition of global environmental concerns, renewable energy is now becoming significant fraction of total electricity production in the world. Advancements in the field of wind electric generator technology and power electronics help to achieve rapid progress in hybrid power system which mainly involves wind, solar and diesel energy with a good battery back-up. Here the discussion brings about the ...

  11. Microbial Fuel Cells using Mixed Cultures of Wastewater for Electricity Generation

    International Nuclear Information System (INIS)

    Zain, S.M; Roslani, N.S.; Hashim, R.; Anuar, N.; Suja, F.; Basi, N.E.A.; Anuar, N.; Daud, W.R.W.

    2011-01-01

    Fossil fuels (petroleum, natural gas and coal) are the main resources for generating electricity. However, they have been major contributors to environmental problems. One potential alternative to explore is the use of microbial fuel cells (MFCs), which generate electricity using microorganisms. MFCs uses catalytic reactions activated by microorganisms to convert energy preserved in the chemical bonds between organic molecules into electrical energy. MFC has the ability to generate electricity during the wastewater treatment process while simultaneously treating the pollutants. This study investigated the potential of using different types of mixed cultures (raw sewage, mixed liquor from the aeration tank and return waste activated sludge) from an activated sludge treatment plant in MFCs for electricity generation and pollutant removals (COD and total kjeldahl nitrogen, TKN). The MFC in this study was designed as a dual-chambered system, in which the chambers were separated by a Nafion TM membrane using a mixed culture of wastewater as a bio catalyst. The maximum power density generated using activated sludge was 9.053 mW/ cm 2 , with 26.8 % COD removal and 40 % TKN removal. It is demonstrated that MFC offers great potential to optimize power generation using mixed cultures of wastewater. (author)

  12. Strategic thinking about nuclear energy: implications of the emerging market structure in electric generation

    International Nuclear Information System (INIS)

    Bodde, D.L.

    1998-01-01

    Global environmental concerns provide strong motivation for electric generating technologies that reduce greenhouse gas emissions. By itself however, this incentive is probably not sufficient to reverse the long-term decline in the market share of nuclear energy. This is because the power plants now offered by the nuclear vendors mesh poorly with the needs of competitive generating markets. Where managers of generating companies are held accountable to share owners in a competitive environment, the nuclear power plants now offered in the market for new generating capacity are at a distinct disadvantage. As much of the world moves toward the competitive model, this disadvantage will become increasingly limiting. An alternative nuclear power plant concept and fuel cycle is needed, a radical departure from current practice, designed with the competitive marketplace in mind. To accomplish this, a new kind of institution is required: multinational in scope, oriented toward the market, and able to master the politics of the fuel cycle. (author)

  13. Electricity market design for generator revenue sufficiency with increased variable generation

    International Nuclear Information System (INIS)

    Levin, Todd; Botterud, Audun

    2015-01-01

    We present a computationally efficient mixed-integer program (MIP) that determines optimal generator expansion decisions, and hourly unit commitment and dispatch in a power system. The impact of increasing wind power capacity on the optimal generation mix and generator profitability is analyzed for a test case that approximates the electricity market in Texas (ERCOT). We analyze three market policies that may support resource adequacy: Operating Reserve Demand Curves (ORDC), Fixed Reserve Scarcity Prices (FRSP) and fixed capacity payments (CP). Optimal expansion plans are comparable between the ORDC and FRSP implementations, while capacity payments may result in additional new capacity. The FRSP policy leads to frequent reserves scarcity events and corresponding price spikes, while the ORDC implementation results in more continuous energy prices. Average energy prices decrease with increasing wind penetration under all policies, as do revenues for baseload and wind generators. Intermediate and peak load plants benefit from higher reserve prices and are less exposed to reduced energy prices. All else equal, an ORDC approach may be preferred to FRSP as it results in similar expansion and revenues with less extreme energy prices. A fixed CP leads to additional new flexible NGCT units, but lower profits for other technologies. - Highlights: • We model three market policies for resource adequacy in power systems with wind. • Unit expansion is comparable between ORDCs and fixed reserves scarcity pricing. • ORDCs lead to a more continuous spectrum of energy prices and fewer price spikes. • Revenues for baseload generators generally decrease with increasing wind penetration. • Capacity payments lead to additional NGCT units and lower energy prices.

  14. Life cycle assessment of electricity generation in Mexico

    International Nuclear Information System (INIS)

    Santoyo-Castelazo, E.; Gujba, H.; Azapagic, A.

    2011-01-01

    This paper presents for the first time a Life Cycle Assessment (LCA) study of electricity generation in Mexico. The electricity mix in Mexico is dominated by fossil fuels, which contribute around 79% to the total primary energy; renewable energies contribute 16.5% (hydropower 13.5%, geothermal 3% and wind 0.02%) and the remaining 4.8% is from nuclear power. The LCA results show that 225 TWh of electricity generate about 129 million tonnes of CO 2 eq. per year, of which the majority (87%) is due to the combustion of fossil fuels. The renewables and nuclear contribute only 1.1% to the total CO 2 eq. Most of the other LCA impacts are also attributed to the fossil fuel options. The results have been compared with values reported for other countries with similar electricity mix, including Italy, Portugal and the UK, showing good agreement. -- Highlights: → This paper presents for the first time a Life Cycle Assessment (LCA) study of electricity generation in Mexico. → 129 million tonnes of CO 2 eq. per year are emitted from 225 TWh of electricity generated per year of which 87% is due to the combustion of fossil fuels. → Coal technologies generate 1094 g CO 2 eq./kWh, heavy fuel oil 964 g CO 2 eq./kWh, and gas 468 g CO 2 eq./kWh; by contrast, nuclear and hydro emit 12 g CO 2 eq./kWh. → Heavy fuel oil contributes most to the life cycle environmental impacts (59-97%). → The results show good agreement with values reported for other countries with similar electricity mix, including Italy, Portugal and the UK.

  15. Production inefficiency of electricity markets with hydro generation

    Energy Technology Data Exchange (ETDEWEB)

    Philpott, Andy; Guan, Ziming; Khazaei, Javad; Zakeri, Golbon [Electric Power Optimization Centre (EPOC), Department of Engineering Science, University of Auckland, 70 Symonds Street, Auckland (New Zealand)

    2010-12-15

    Electricity market designs that decentralize decision making for participants can lead to inefficiencies in the presence of nonconvexity or missing markets. This has been shown in the case of unit-commitment problems that can make a decentralized market equilibrium less efficient than a centrally planned solution. Less attention has been focused on systems with large amounts of hydro-electric generation. We describe the results of an empirical study of the New Zealand wholesale electricity market that attempts to quantify production efficiency losses by comparing market outcomes with a counterfactual central plan. (author)

  16. Health and ecological effects of electricity generation and consumption

    International Nuclear Information System (INIS)

    Duclos, J.; Midot, S.

    1984-01-01

    Comparison of the health and environmental effects of electricity production systems shows that the comprehensive French programme for nuclear power plant construction affords numerous advantages over an alternative programme of coal-fired plants: (1) by reducing health effects (2000 premature deaths will be prevented between 1973 and 1990) and (2) by lowering the releases of atmospheric pollutants (SO 2 releases from thermal power plants will be reduced to a third between 1980 and 1995). Moreover, replacement of fossil fuels by electricity from this source will further diminish atmospheric pollution among consumers. If this replacement accounts for about fifty TW.h in 1990, as planned, there will be an additional 6% reduction in SO 2 releases in France, as compared with 1980. (author)

  17. Assessing the Environmental Sustainability of Electricity Generation in Turkey on a Life Cycle Basis

    Directory of Open Access Journals (Sweden)

    Burcin Atilgan

    2016-01-01

    Full Text Available Turkey’s electricity mix is dominated by fossil fuels, but the country has ambitious future targets for renewable and nuclear energy. At present, environmental impacts of electricity generation in Turkey are unknown so this paper represents a first attempt to fill this knowledge gap. Taking a life cycle approach, the study considers eleven impacts from electricity generation over the period 1990–2014. All 516 power plants currently operational in Turkey are assessed: lignite, hard coal, natural gas, hydro, onshore wind and geothermal. The results show that the annual impacts from electricity have been going up steadily over the period, increasing by 2–9 times, with the global warming potential being higher by a factor of five. This is due to a four-fold increase in electricity demand and a growing share of fossil fuels. The impact trends per unit of electricity generated differ from those for the annual impacts, with only four impacts being higher today than in 1990, including the global warming potential. Most other impacts are lower from 35% to two times. These findings demonstrate the need for diversifying the electricity mix by increasing the share of domestically-abundant renewable resources, such as geothermal, wind, and solar energy.

  18. Electric power systems advanced forecasting techniques and optimal generation scheduling

    CERN Document Server

    Catalão, João P S

    2012-01-01

    Overview of Electric Power Generation SystemsCláudio MonteiroUncertainty and Risk in Generation SchedulingRabih A. JabrShort-Term Load ForecastingAlexandre P. Alves da Silva and Vitor H. FerreiraShort-Term Electricity Price ForecastingNima AmjadyShort-Term Wind Power ForecastingGregor Giebel and Michael DenhardPrice-Based Scheduling for GencosGovinda B. Shrestha and Songbo QiaoOptimal Self-Schedule of a Hydro Producer under UncertaintyF. Javier Díaz and Javie

  19. Hydrolysis Batteries: Generating Electrical Energy during Hydrogen Absorption.

    Science.gov (United States)

    Xiao, Rui; Chen, Jun; Fu, Kai; Zheng, Xinyao; Wang, Teng; Zheng, Jie; Li, Xingguo

    2018-02-19

    The hydrolysis reaction of aluminum can be decoupled into a battery by pairing an Al foil with a Pd-capped yttrium dihydride (YH 2 -Pd) electrode. This hydrolysis battery generates a voltage around 0.45 V and leads to hydrogen absorption into the YH 2 layer. This represents a new hydrogen absorption mechanism featuring electrical energy generation during hydrogen absorption. The hydrolysis battery converts 8-15 % of the thermal energy of the hydrolysis reaction into usable electrical energy, leading to much higher energy efficiency compared to that of direct hydrolysis. © 2018 Wiley-VCH Verlag GmbH & Co. KGaA, Weinheim.

  20. Perspectives of the electric power industry amid the transforming global power generation markets

    Science.gov (United States)

    Makarov, A. A.; Mitrova, T. A.; Veselov, F. V.; Galkina, A. A.; Kulagin, V. A.

    2017-10-01

    A scenario-based prognosis of the evolution of global power generation markets until 2040, which was developed using the Scaner model-and-information complex, was given. The perspective development of fuel markets, vital for the power generation industry, was considered, and an attempt to predict the demand, production, and prices of oil, gas, coal, and noncarbon resources across various regions of the world was made. The anticipated decline in the growth of the global demand for fossil fuels and their sufficiency with relatively low extraction expenses will maintain the fuel prices (the data hereinafter are given as per 2014 prices) lower than their peak values in 2012. The outrunning growth of demand for electric power is shown in comparison with other power resources by regions and large countries in the world. The conditions of interfuel competition in the electric power industry considering the changes in anticipated fuel prices and cost indicators for various power generation technologies were studied. For this purpose, the ratios of discounted costs of electric power production by new gas and coal TPPs and wind and solar power plants were estimated. It was proven that accounting the system effects (operation modes, necessary duplicating and reserving the power of electric power plants using renewable energy sources) notably reduces the competitiveness of the renewable power industry and is not always compensated by the expected lowering of its capital intensity and growth of fuel for TPPs. However, even with a moderate (in relation to other prognoses) growth of the role of power plants using renewable energy sources, they will triple electric power production. In this context, thermal power plants will preserve their leadership covering up to 60% of the global electric power production, approximately half using gas.

  1. Cost structure of coal- and nuclear-fired electric power plants

    International Nuclear Information System (INIS)

    Helmuth, J.A.

    1981-01-01

    This dissertation investigates the cost structure of coal and nuclear electric power generation. The emphasis of the paper is to empirically estimate the direct costs of generating base-load electric power at the plant level. Empirically, the paper first investigates the relative comparative costs of nuclear and coal power generation, based on historical operating data. Consideration of the learning curve and other dynamic elements is incorporated in the analysis. The second empirical thrust is to inestigate economies of scale for both technologies. The results from the empirical studies give an indication as to the future and present cost viability of each technology. Implications toward energy policy are discussed

  2. Trends and problems in development of the power plants electrical part

    Science.gov (United States)

    Gusev, Yu. P.

    2015-03-01

    The article discusses some problems relating to development of the electrical part of modern nuclear and thermal power plants, which are stemming from the use of new process and electrical equipment, such as gas turbine units, power converters, and intellectual microprocessor devices in relay protection and automated control systems. It is pointed out that the failure rates of electrical equipment at Russian and foreign power plants tend to increase. The ongoing power plant technical refitting and innovative development processes generate the need to significantly widen the scope of research works on the electrical part of power plants and rendering scientific support to works on putting in use innovative equipment. It is indicated that one of main factors causing the growth of electrical equipment failures is that some of components of this equipment have insufficiently compatible dynamic characteristics. This, in turn may be due to lack or obsolescence of regulatory documents specifying the requirements for design solutions and operation of electric power equipment that incorporates electronic and microprocessor control and protection devices. It is proposed to restore the system of developing new and updating existing departmental regulatory technical documents that existed in the 1970s, one of the fundamental principles of which was placing long-term responsibility on higher schools and leading design institutions for rendering scientific-technical support to innovative development of components and systems forming the electrical part of power plants. This will make it possible to achieve lower failure rates of electrical equipment and to steadily improve the competitiveness of the Russian electric power industry and energy efficiency of generating companies.

  3. Analysis of Axial Turbine Pico-Hydro Electrical Power Plant in North Sulawesi Indonesia

    Science.gov (United States)

    Sangari, F. J.; Rompas, P. T. D.

    2018-02-01

    This study presents analysis of pico-hydro electrical power plant in North Sulawesi, Indonesia. The objective of this study is to get a design of axial turbine pico-hydro electrical power plant. The method used the study of literature, survey the construction site of the power plant and the characteristics of the location being a place of study, analysis of hydropower ability and analyzing costs of power plant. The result showed that the design of axial turbine pico-hydro installation is connected to a generator to produce electrical energy maximum can be used for household needs in villages. This analyze will be propose to local government of Minahasa, North Sulawesi, Indonesia.

  4. Entropy generation minimization: A practical approach for performance evaluation of temperature cascaded co-generation plants

    KAUST Repository

    Myat, Aung

    2012-10-01

    We present a practical tool that employs entropy generation minimization (EGM) approach for an in-depth performance evaluation of a co-generation plant with a temperature-cascaded concept. Co-generation plant produces useful effect production sequentially, i.e., (i) electricity from the micro-turbines, (ii) low pressure steam at 250 °C or about 8-10 bars, (iii) cooling capacity of 4 refrigeration tones (Rtons) and (iv) dehumidification of outdoor air for air conditioned space. The main objective is to configure the most efficient configuration of producing power and heat. We employed entropy generation minimization (EGM) which reflects to minimize the dissipative losses and maximize the cycle efficiency of the individual thermally activated systems. The minimization of dissipative losses or EGM is performed in two steps namely, (i) adjusting heat source temperatures for the heat-fired cycles and (ii) the use of Genetic Algorithm (GA), to seek out the sensitivity of heat transfer areas, flow rates of working fluids, inlet temperatures of heat sources and coolant, etc., over the anticipated range of operation to achieve maximum efficiency. With EGM equipped with GA, we verified that the local minimization of entropy generation individually at each of the heat-activated processes would lead to the maximum efficiency of the system. © 2012.

  5. Definitional Noise in Estimates of Water Use for Electrical Generation (Invited)

    Science.gov (United States)

    Diehl, T. H.

    2013-12-01

    A key challenge in water-resources planning and policy is determining how much water is withdrawn and consumed to meet various needs. In the case of electrical power generation, quantifying water use is beset by differences and confusion in defining the basic terms relating water used in generating electricity to its hydrologic context, leading to wide disagreement on the amounts of withdrawal and consumption. Water withdrawals by plants with artificial cooling ponds, water consumption by plants with once-through cooling systems, and water diversion and consumption associated with hydroelectric power generation provide three examples of this 'definitional noise'. Plants that use cooling ponds withdraw water from other water bodies to make up for water lost from the pond, primarily as evaporation. Some of these plants report as withdrawal all flow from the pond to the condenser; others report only the much smaller flows needed to make up for water lost from the pond. Inconsistent assignment of plants to these two categories produces differences of several billion gallons per day in withdrawal estimates. Estimates of water consumption at plants with once-through cooling systems directly connected to natural surface water bodies vary substantially depending on whether 'consumption' is defined as being restricted to water loss within the plant or includes forced evaporation outside the plant caused by heat from the warmed cooling water returned to the source water body. Blurring of this distinction has produced wildly divergent consumption estimates. Differences in defining the processes that constitute water use for electrical generation produce dramatic differences in estimated water use. Historically, hydroelectric plants have been defined as having no water withdrawals or consumption. However, if flow through hydroelectric turbines were treated as withdrawal it would dwarf all other types of withdrawal, and if evaporation from reservoirs used for hydroelectric

  6. Competitiveness of biomass-fueled electrical power plants.

    Science.gov (United States)

    Bruce A. McCarl; Darius M. Adams; Ralph J. Alig; John T. Chmelik

    2000-01-01

    One way countries like the United States can comply with suggested rollbacks in greenhouse gas emissions is by employing power plants fueled with biomass. We examine the competitiveness of biomass-based fuel for electrical power as opposed to coal using a mathematical programming structure. We consider fueling power plants from milling residues, whole trees, logging...

  7. Life Cycle Assessment of Producing Electricity in Thailand: A Case Study of Natural Gas Power Plant

    Directory of Open Access Journals (Sweden)

    Usapein Parnuwat

    2017-01-01

    Full Text Available Environmental impacts from natural gas power plant in Thailand was investigated in this study. The objective was to identify the hotspot of environmental impact from electricity production and the allocation of emissions from power plant was studied. All stressors to environment were collected for annual natural gas power plant operation. The allocation of environmental load between electricity and steam was done by WRI/WBCSD method. Based on the annual power plant operation, the highest of environmental impact was fuel combustion, followed by natural gas extraction, and chemical reagent. After allocation, the result found that 1 kWh of electricity generated 0.425 kgCO2eq and 1 ton of steam generated 225 kgCO2eq. When compared based on 1GJ of energy product, the result showed that the environmental impact of electricity is higher than steam product. To improve the environmental performance, it should be focused on the fuel combustion, for example, increasing the efficiency of gas turbine, and using low sulphur content of natural gas. This result can be used as guideline for stakeholder who engage with the environmental impact from power plant; furthermore, it can be useful for policy maker to understand the allocation method between electricity and steam products.

  8. Statistical analysis of regional capital and operating costs for electric power generation

    Energy Technology Data Exchange (ETDEWEB)

    Sanchez, L.R.; Myers, M.G.; Herrman, J.A.; Provanizano, A.J.

    1977-10-01

    This report presents the results of a three and one-half-month study conducted for Brookhaven National Lab. to develop capital and operating cost relationships for seven electric power generating technologies: oil-, coal-, gas-, and nuclear-fired steam-electric plants, hydroelectric plants, and gas-turbine plants. The methodology is based primarily on statistical analysis of Federal Power Commission data for plant construction and annual operating costs. The development of cost-output relationships for electric power generation is emphasized, considering the effects of scale, technology, and location on each of the generating processes investigated. The regional effects on cost are measured at the Census Region level to be consistent with the Brookhaven Multi-Regional Energy and Interindustry Regional Model of the United States. Preliminary cost relationships for system-wide costs - transmission, distribution, and general expenses - were also derived. These preliminary results cover the demand for transmission and distribution capacity and operating and maintenance costs in terms of system-service characteristics. 15 references, 6 figures, 23 tables.

  9. Assessing the value of wind generation in future carbon constrained electricity industries

    International Nuclear Information System (INIS)

    Vithayasrichareon, Peerapat; MacGill, Iain F.

    2013-01-01

    This paper employs a novel Monte-Carlo based generation portfolio assessment tool to explore the implications of increasing wind penetration and carbon prices within future electricity generation portfolios under considerable uncertainty. This tool combines optimal generation mix techniques with Monte Carlo simulation and portfolio analysis methods to determine expected overall generation costs, associated cost uncertainty and expected CO 2 emissions for different possible generation portfolios. A case study of an electricity industry with coal, Combined Cycle Gas Turbines (CCGT), Open Cycle Gas Turbines (OCGT) and wind generation options that faces uncertain future fossil-fuel prices, carbon pricing, electricity demand and plant construction costs is presented to illustrate some of the key issues associated with growing wind penetrations. The case study uses half-hourly demand and wind generation data from South Eastern Australia, and regional estimates of new-build plant costs and characteristics. Results suggest that although wind generation generally increases overall industry costs, it reduces associated cost uncertainties and CO 2 emissions. However, there are some cases in which wind generation can reduce the overall costs of generation portfolios. The extent to which wind penetration affects industry expected costs and uncertainties depends on the level of carbon price and the conventional technology mix in the portfolios. - Highlights: ► A probabilistic portfolio analysis tool to assess generation portfolios with wind power. ► Explore the impacts of wind penetrations and carbon prices under uncertainties. ► Wind generation increases overall portfolio costs but reduces cost risks and emissions. ► The value of wind power depends on the carbon price and the technology mix. ► Complex interactions between wind penetration level and carbon pricing.

  10. Equivalent Electrical Circuits of Thermoelectric Generators under Different Operating Conditions

    Directory of Open Access Journals (Sweden)

    Saima Siouane

    2017-03-01

    Full Text Available Energy harvesting has become a promising and alternative solution to conventional energy generation patterns to overcome the problem of supplying autonomous electrical systems. More particularly, thermal energy harvesting technologies have drawn a major interest in both research and industry. Thermoelectric Generators (TEGs can be used in two different operating conditions, under constant temperature gradient or constant heat flow. The commonly used TEG electrical model, based on a voltage source in series with an electrical resistance, shows its limitations especially under constant heat flow conditions. Here, the analytical electrical modeling, taking into consideration the internal and contact thermal resistances of a TEG under constant temperature gradient and constant heat flow conditions, is first given. To give further insight into the electrical behavior of a TEG module in different operating conditions, we propose a new and original way of emulating the above analytical expressions with usual electronics components (voltage source, resistors, diode, whose values are determined with the TEG’s parameters. Note that such a TEG emulation is particularly suited when designing the electronic circuitry commonly associated to the TEG, to realize both Maximum Power Point Tracking and output voltage regulation. First, the proposed equivalent electrical circuits are validated through simulation with a SPICE environment in static operating conditions using only one value of either temperature gradient or heat flow. Then, they are also analyzed in dynamic operating conditions where both temperature gradient and heat flow are considered as time-varying functions.

  11. Method for analysing the adequacy of electric power systems with wind power plants and energy storages

    Directory of Open Access Journals (Sweden)

    Perzhabinsky Sergey

    2017-01-01

    Full Text Available Currently, renewable energy sources and energy storage devices are actively introduced into electric power systems. We developed method to analyze the adequacy of these electric power systems. The method takes into account the uncertainty of electricity generation by wind power plants and the processes of energy storage. The method is based on the Monte Carlo method and allowed to use of long-term meteorological data in open access. The performed experimental research of electrical power system is constructed on the basis of the real technical and meteorological data. The method allows to estimate of effectiveness of introducing generators based on renewable energy sources and energy storages in electric power systems.

  12. The Integration of Electrical Signals Originating in the Root of Vascular Plants

    Directory of Open Access Journals (Sweden)

    Javier Canales

    2018-01-01

    Full Text Available Plants have developed different signaling systems allowing for the integration of environmental cues to coordinate molecular processes associated to both early development and the physiology of the adult plant. Research on systemic signaling in plants has traditionally focused on the role of phytohormones as long-distance signaling molecules, and more recently the importance of peptides and miRNAs in building up this communication process has also been described. However, it is well-known that plants have the ability to generate different types of long-range electrical signals in response to different stimuli such as light, temperature variations, wounding, salt stress, or gravitropic stimulation. Presently, it is unclear whether short or long-distance electrical communication in plants is linked to nutrient uptake. This review deals with aspects of sensory input in plant roots and the propagation of discrete signals to the plant body. We discuss the physiological role of electrical signaling in nutrient uptake and how nutrient variations may become an electrical signal propagating along the plant.

  13. A calculation program for electricity generation costs using LOTUS

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Sung Ki; Lee, Man Ki [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1994-12-01

    This program is designed in order to calculate electricity generation cost by different energy sources, and menu type is adopted for user convenience. This program also graphically shows the share of capital investment cost, O and M cost, and fuel cost. Sensitivity analysis about discount rate can also be carried out by this program, taking into consideration the important role of the discount rate in the generation costs calculation. (Author) 7 refs., 1 fig., 3 tabs.

  14. 78 FR 69367 - Golden Valley Electric Association: Healy Power Plant Unit #2 Restart

    Science.gov (United States)

    2013-11-19

    ... http://www.rurdev.usda.gov/UWP-HealyPowerPlan.html or you may contact Ms. Remley for a hard copy... DEPARTMENT OF AGRICULTURE Rural Utilities Service Golden Valley Electric Association: Healy Power... restart and commercial operation of Healy Unit 2, a power generation facility at the Healy Power Plant...

  15. Combined generation of electric and heating energy in future development of Yugoslav energy sector until 2000

    International Nuclear Information System (INIS)

    Djajic, Nenad; Zivanovic, Vladimir

    2000-01-01

    Development of the district heating system in the FR Yugoslavia, beside the combined generation of electric and heating energy presents a necessity for energy, economic and ecological reasons. Although the structure of energy reserves is rather unfavourable considering that the lignite is being predominantly used, available reserves of energy raw material are able to ensure the long-term development of Yugoslav energy sector, and to offer real possibilities for considerable substitution of foreign good quality fuels, especially in district heating systems. Their further development will depend, among other things: on the implementation of new technological solutions for the exploitation of local energy resources; need of reconstruction, revitalisation and transformation of old condensing thermal power plants into the cogeneration plants; installation of remote controlled transmission of heating energy as well as on development of heating plants and smaller co-generation plants based on local energy resources. (Authors)

  16. The Environmental Impact of Electrical Generation: Nuclear vs. Conventional.

    Science.gov (United States)

    McDermott, John J., Ed.

    This minicourse, partially supported by the Division of Nuclear Education and Training of the U.S. Atomic Energy Commission, is an effort to describe the benefit-to-risk ratio of various methods of generating electrical power. It attempts to present an unbiased, straightforward, and objective view of the advantages and disadvantages of nuclear…

  17. Evaluation of full strength paper mill effluent for electricity generation ...

    African Journals Online (AJOL)

    0615306y

    2011-11-07

    Nov 7, 2011 ... effluents: A review. Adv. Environ. Res. 5: 175-196. Antonopoulou G, Stamatelatou K, Bebelis S, Lyberatos G (2010). Electricity generation from synthetic substrates and cheese whey · using a two chamber microbial fuel cell. Biochem. Eng. J. 50: 10-15. Azbar N, Dokgoz FTC, Keskin T, Korkmaz KS, Syed HM ...

  18. WASP as a planning tool of electrical generation systems expansion

    International Nuclear Information System (INIS)

    D'Isidoro, G.

    1984-01-01

    The ''Wien Automatic System Package'' (WASP), consists of six modules or computer programmes which assist in decision taking process in expanding an electrical generation network. A general description of this model is made and some conclusions are drawn from the data processed to this date

  19. Centralized electricity generation in offshore wind farms using hydraulic networks

    NARCIS (Netherlands)

    Jarquin Laguna, A.

    2017-01-01

    The work presented in this thesis explores a new way of generation, collection and transmission of wind energy inside a wind farm, in which the electrical conversion does not occur during any intermediate conversion step before the energy has reached the offshore central platform. A centralized

  20. Utilization of hydrogen gas production for electricity generation in ...

    African Journals Online (AJOL)

    Lecturer

    2012-05-03

    % total sugar concentration of sugar ... 107 cfu/ml, pH was nearly constant at 6.0, and finally the H2 was drifted to fuel cell to generate electrical power until 4 V ..... hybrid system, reverse micelles and by metabolic engi- neering.

  1. The external costs of transport and electricity generation

    Energy Technology Data Exchange (ETDEWEB)

    Stead, D. [OTB Research Institute for Housing, Urban and Mobility Studies, Delft University of Technology, Delft (Netherlands)

    2003-07-01

    The European Commission has recently publicised the results of a number of related studies aimed at quantifying the full socio-environmental costs of different means of transport and electricity generation with a view to strengthening the empirical basis for potential future decision-making on eco-taxes. In this article those studies are briefly discussed.

  2. Generating electricity at a breakwater in a moderate wave climate

    NARCIS (Netherlands)

    Schoolderman, J.; Reedijk, B.; Vrijling, J.K.; Molenaar, W.F.; Ten Oever, E.; Zijlema, M.

    2011-01-01

    A new concept for wave energy conversion is examined as a proof of concept for generating electricity in a moderate wave climate while being integrated in a caisson breakwater. Physical model testing is performed to analyse the preliminary efficiency of the device and to identify areas of

  3. Improvements to the IAEA's electric generation expansion model

    International Nuclear Information System (INIS)

    Stoytchev, D.; Georgiev, S.

    1997-01-01

    This paper deals with the implementation of the IAEA's planning approach and software in Bulgaria. The problems encountered in the process are summarized, with emphasis on two of the limitations of the electric generation expansion model (WASP). The solutions found by Bulgarian experts to overcome these problems are also described, together with some comparative results of the tests performed. (author)

  4. Student generated assignments about electrical circuits in a computer simulation

    NARCIS (Netherlands)

    Vreman-de Olde, Cornelise; de Jong, Anthonius J.M.

    2004-01-01

    In this study we investigated the design of assignments by students as a knowledge-generating activity. Students were required to design assignments for 'other students' in a computer simulation environment about electrical circuits. Assignments consisted of a question, alternatives, and feedback on

  5. Assessment of wind energy potential for electricity generation

    African Journals Online (AJOL)

    fossil fuel for energy production has been estimated to contribute about 80. % of the total gses responsible for the green house effect of the atmosphere. Renewable energy sources such as wind, if thoroughly investigated, could be used to reduce the dependence on fossil fuels for electricity generation. Although wind ...

  6. Increasing coal-fired power generation efficiency to reduce electric cost and environmental emissions

    International Nuclear Information System (INIS)

    Torrens, I.M.; Stenzel, W.C.

    1997-01-01

    New generating capacity required globally between 1993 and 2010 is estimated to be around 1500 GW, of which some two-thirds will be outside the OECD, and some 40 % in the Asian non-OECD countries. Coal is likely to account for a substantial fraction of this new generation. Today's state-of-the-art supercritical coal-fired power plant has a conversion efficiency of some 42-45 %. The capital cost increase associated with the supercritical or ultra-supercritical pulverized coal power plant compared to a conventional subcritical plant is small to negligible. The increased efficiency associated with the supercritical plant leads to an actual reduction in the total cost of electricity generated in cents/kWh, relative to a conventional plant. Despite this, the power sector continues to build subcritical plants and has no near term plans to increase the efficiency of power plants in the projects it is developing. Advanced clean coal technologies such as integrated gasification combined cycle and pressurized fluidized bed combustion will be selected for independent power projects only in very specific circumstances. Advanced clean coal plants can be operated reliably and with superior performance, and specifically that their present estimated capital costs can be reduced substantially to a point where they are competitive with state-of-the-art pulverized coal technologies. (R.P.)

  7. Renewable Electricity Futures Study. Volume 2. Renewable Electricity Generation and Storage Technologies

    Energy Technology Data Exchange (ETDEWEB)

    Augustine, Chad [National Renewable Energy Lab. (NREL), Golden, CO (United States); Bain, Richard [National Renewable Energy Lab. (NREL), Golden, CO (United States); Chapman, Jamie [Texas Tech Univ., Lubbock, TX (United States); Denholm, Paul [National Renewable Energy Lab. (NREL), Golden, CO (United States); Drury, Easan [National Renewable Energy Lab. (NREL), Golden, CO (United States); Hall, Douglas G. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Lantz, Eric [National Renewable Energy Lab. (NREL), Golden, CO (United States); Margolis, Robert [National Renewable Energy Lab. (NREL), Golden, CO (United States); Thresher, Robert [National Renewable Energy Lab. (NREL), Golden, CO (United States); Sandor, Debra [National Renewable Energy Lab. (NREL), Golden, CO (United States); Bishop, Norman A. [Knight Piesold, Denver, CO (United States); Brown, Stephen R. [HDR/DTA, Portland, ME (Untied States); Cada, Glenn F. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Felker, Fort [National Renewable Energy Lab. (NREL), Golden, CO (United States); Fernandez, Steven J. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Goodrich, Alan C. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Hagerman, George [Virginia Polytechnic Inst. and State Univ. (Virginia Tech), Blacksburg, VA (United States); Heath, Garvin [National Renewable Energy Lab. (NREL), Golden, CO (United States); O' Neil, Sean [Ocean Renewable Energy Coalition, Portland, OR (United States); Paquette, Joshua [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Tegen, Suzanne [National Renewable Energy Lab. (NREL), Golden, CO (United States); Young, Katherine [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2012-06-15

    The Renewable Electricity Futures (RE Futures) Study investigated the challenges and impacts of achieving very high renewable electricity generation levels in the contiguous United States by 2050. The analysis focused on the sufficiency of the geographically diverse U.S. renewable resources to meet electricity demand over future decades, the hourly operational characteristics of the U.S. grid with high levels of variable wind and solar generation, and the potential implications of deploying high levels of renewables in the future. RE Futures focused on technical aspects of high penetration of renewable electricity; it did not focus on how to achieve such a future through policy or other measures. Given the inherent uncertainties involved with analyzing alternative long-term energy futures as well as the multiple pathways that might be taken to achieve higher levels of renewable electricity supply, RE Futures explored a range of scenarios to investigate and compare the impacts of renewable electricity penetration levels (30%–90%), future technology performance improvements, potential constraints to renewable electricity development, and future electricity demand growth assumptions. RE Futures was led by the National Renewable Energy Laboratory (NREL) and the Massachusetts Institute of Technology (MIT). Learn more at the RE Futures website. http://www.nrel.gov/analysis/re_futures/

  8. Renewable Electricity Futures Study. Volume 2: Renewable Electricity Generation and Storage Technologies

    Energy Technology Data Exchange (ETDEWEB)

    Augustine, C.; Bain, R.; Chapman, J.; Denholm, P.; Drury, E.; Hall, D.G.; Lantz, E.; Margolis, R.; Thresher, R.; Sandor, D.; Bishop, N.A.; Brown, S.R.; Cada, G.F.; Felker, F.

    2012-06-01

    The Renewable Electricity Futures (RE Futures) Study investigated the challenges and impacts of achieving very high renewable electricity generation levels in the contiguous United States by 2050. The analysis focused on the sufficiency of the geographically diverse U.S. renewable resources to meet electricity demand over future decades, the hourly operational characteristics of the U.S. grid with high levels of variable wind and solar generation, and the potential implications of deploying high levels of renewables in the future. RE Futures focused on technical aspects of high penetration of renewable electricity; it did not focus on how to achieve such a future through policy or other measures. Given the inherent uncertainties involved with analyzing alternative long-term energy futures as well as the multiple pathways that might be taken to achieve higher levels of renewable electricity supply, RE Futures explored a range of scenarios to investigate and compare the impacts of renewable electricity penetration levels (30%-90%), future technology performance improvements, potential constraints to renewable electricity development, and future electricity demand growth assumptions. RE Futures was led by the National Renewable Energy Laboratory (NREL) and the Massachusetts Institute of Technology (MIT).

  9. Performances of nuclear power plants for combined production of electricity and hot water for district heating

    International Nuclear Information System (INIS)

    Bronzen, S.

    The possibilities for using nuclear power plants for combined production of heat and power seem to be very good in the future. With the chosen 600 MWsub (e) BWR plant a heat output up to 1200 MW can be arranged. An alternative, consisting of steam extractions from the low-pressure turbine, offers a flexible solution for heat and power generation. With this alternative the combined plant can use components from normal condensing nuclear power plants. The flexible extraction design also offers a real possibility for using the combined plant in electric peak generation. However, urban siting requires long distance heat transmission and the pipe design for this transmission is a major problem when planning and optimizing the whole nuclear combined heat and power plant. (author)

  10. Next Generation Nuclear Plant GAP Analysis Report

    Energy Technology Data Exchange (ETDEWEB)

    Ball, Sydney J [ORNL; Burchell, Timothy D [ORNL; Corwin, William R [ORNL; Fisher, Stephen Eugene [ORNL; Forsberg, Charles W. [Massachusetts Institute of Technology (MIT); Morris, Robert Noel [ORNL; Moses, David Lewis [ORNL

    2008-12-01

    As a follow-up to the phenomena identification and ranking table (PIRT) studies conducted recently by NRC on next generation nuclear plant (NGNP) safety, a study was conducted to identify the significant 'gaps' between what is needed and what is already available to adequately assess NGNP safety characteristics. The PIRT studies focused on identifying important phenomena affecting NGNP plant behavior, while the gap study gives more attention to off-normal behavior, uncertainties, and event probabilities under both normal operation and postulated accident conditions. Hence, this process also involved incorporating more detailed evaluations of accident sequences and risk assessments. This study considers thermal-fluid and neutronic behavior under both normal and postulated accident conditions, fission product transport (FPT), high-temperature metals, and graphite behavior and their effects on safety. In addition, safety issues related to coupling process heat (hydrogen production) systems to the reactor are addressed, given the limited design information currently available. Recommendations for further study, including analytical methods development and experimental needs, are presented as appropriate in each of these areas.

  11. 1992 statistical data on electricity consumption and generation in Bulgaria

    International Nuclear Information System (INIS)

    Georgiev, A.

    1993-01-01

    The report provides data on monthly power consumption based on peak-day load profiles, power balance of electric system in peak hours of absolute maximal load and analysis of usability of different kinds of power plants in the country. The total energy production for all power plants for 1992 is 35555 ml kWh - 48.6 % TPP, 32.5% NPP, 5.8% HPP, 8.5% in-house TPP, 4.6 district heating PP. 14 tabs., 5 figs. (author)

  12. Bio-electricity Generation using Jatropha Oil Seed Cake.

    Science.gov (United States)

    Raheman, Hifjur; Padhee, Debasish

    2016-01-01

    The review of patents reveals that Handling of Jatropha seed cake after extraction of oil is essential as it contains toxic materials which create environmental pollution. The goal of this work is complete utilisation of Jatropha seeds. For this purpose, Jatropha oil was used for producing biodiesel and the byproduct Jatropha seed cake was gasified to obtain producer gas. Both biodiesel and producer gas were used to generate electricity. To achieve this, a system comprising gasifier, briquetting machine, diesel engine and generator was developed. Biodiesel was produced successfully using the method patented for biodiesel production and briquettes of Jatropha seed cake were made using a vertical extruding machine. Producer gas was obtained by gasifying these briquettes in a downdraft gasifier. A diesel engine was then run in dual fuel mode with biodiesel and producer gas instead of only diesel. Electricity was generated by coupling it to a generator. The cost of producing kilowatthour of electricity with biodiesel and diesel in dual fuel mode with producer gas was found to be 0.84 $ and 0.75 $, respectively as compared to 0.69 $ and 0.5 $ for the same fuels in single fuel mode resulting in up to 48 % saving of pilot fuel. Compared to singlefuel mode, there was 25-32 % reduction in system and brake thermal efficiency along with significantly lower NOx, higher CO and CO2 emissions when the bio-electricity generating system was operated in dual fuel mode. Overall, the developed system could produce electricity successfully by completely uti- lising Jatropha seeds without leaving any seed cake to cause environmental pollution.

  13. Optimal electricity generation system expansion and nuclear power option in Belarus

    International Nuclear Information System (INIS)

    Yakushau, A.; Mikhalevich, A.

    2000-01-01

    After having declared independence, the Republic of Belarus was forced to import 90% of fuel consumed and 25% of electricity. The deficit of peak electric capacity reached 40%. The imported fuel covers the last years because the drop in the production reduced the energy consumption in the Republic but not the needs of the energy sector. Annual payments for imported fuel and electricity are equal to the sum of an annual state budget of Belarus (about 1.5 billion USD) and current debts were not lower 300 million. Comparative analysis of the different scenarios of the electricity generation system expansion showed that an optimum way for electricity generation is installation of the combine cycle units and construction nuclear power plants. The results of the study also showed that the option based on replacement of deficit of the electricity generation by the way of the construction combine cycle units with capacities 450 MW turned out to be the best solution among non nuclear options. (author)

  14. Hybrid Systems of Distributed Generation with Renewable Sources: Modeling and Analysis of Their Operational Modes in Electric Power System

    Directory of Open Access Journals (Sweden)

    A. M. Gashimov

    2013-01-01

    Full Text Available The paper considers problems pertaining to modeling and simulation of operational hybrid system modes of the distributed generation comprising conventional sources – modular diesel generators, gas-turbine power units; and renewable sources – wind and solar power plants. Operational modes of the hybrid system have been investigated under conditions of electrical connection with electric power system and in case of its isolated operation. As a consequence

  15. Source book for planning nuclear dual-purpose electric/distillation desalination plants

    International Nuclear Information System (INIS)

    Reed, S.A.

    1981-02-01

    A source book on nuclear dual-purpose electric/distillation desalination plants was prepared to assist government and other planners in preparing broad evaluations of proposed applications of dual-purpose plants. The document is divided into five major sections. Section 1 presents general discussions relating to the benefits of dual-purpose plants, and spectrum for water-to-power ratios. Section 2 presents information on commercial nuclear plants manufactured by US manufacturers. Section 3 gives information on distillation desalting processes and equipment. Section 4 presents a discussion on feedwater pretreatment and scale control. Section 5 deals with methods for coupling the distillation and electrical generating plants to operate in the dual mode

  16. Source book for planning nuclear dual-purpose electric/distillation desalination plants

    Energy Technology Data Exchange (ETDEWEB)

    Reed, S.A.

    1981-02-01

    A source book on nuclear dual-purpose electric/distillation desalination plants was prepared to assist government and other planners in preparing broad evaluations of proposed applications of dual-purpose plants. The document is divided into five major sections. Section 1 presents general discussions relating to the benefits of dual-purpose plants, and spectrum for water-to-power ratios. Section 2 presents information on commercial nuclear plants manufactured by US manufacturers. Section 3 gives information on distillation desalting processes and equipment. Section 4 presents a discussion on feedwater pretreatment and scale control. Section 5 deals with methods for coupling the distillation and electrical generating plants to operate in the dual mode.

  17. Modelling of electricity generation of large interconnected power systems: How can a CO2 tax influence the European generation mix

    International Nuclear Information System (INIS)

    Voorspools, Kris R.; D'haeseleer, William D.

    2006-01-01

    This paper discusses a methodology for detailed modelling of electricity generation of large interconnected power systems in a liberalised market. The resulting model, called E-Simulate, respects the technological restrictions and boundary conditions inherent to power generation and simulates the power generation and cross border trade on an hourly basis and on a power plant level. Nevertheless, E-Simulate is sufficiently flexible, transparent and fast. It is a valid, objective and useful tool in the simulation of the impact of power generation topics in the context of liberalised markets and GHG emission reduction. As a comprehensive example of the use and the strength of E-Simulate, we study the effect of a CO 2 tax on power generation and electricity trade in and between eight interconnected European zones: The Netherlands, Belgium/Luxemburg, France, Germany, Spain, Portugal, Switzerland and Italy. A CO 2 tax of 10 Euro /ton CO 2 causes an overall CO 2 emission reduction of about 6%. We notice an overall increase in gas fired generation and a corresponding reduction of coal and lignite fired generation on a trans-national level. In some zones (The Netherlands, Belgium/Luxemburg and Italy), the emissions will rise. In others (France, Germany and Spain), emissions will decrease. This is a result of the CO 2 tax that not only causes a shift towards fuels with lower carbon content but also, and correspondingly, leads to a redistribution of cross border trade

  18. Electricity-market price and nuclear power plant shutdown: Evidence from California

    International Nuclear Information System (INIS)

    Woo, C.K.; Ho, T.; Zarnikau, J.; Olson, A.; Jones, R.; Chait, M.; Horowitz, I.; Wang, J.

    2014-01-01

    Japan's Fukushima nuclear disaster, triggered by the March 11, 2011 earthquake, has led to calls for shutting down existing nuclear plants. To maintain resource adequacy for a grid's reliable operation, one option is to expand conventional generation, whose marginal unit is typically fueled by natural-gas. Two timely and relevant questions thus arise for a deregulated wholesale electricity market: (1) what is the likely price increase due to a nuclear plant shutdown? and (2) what can be done to mitigate the price increase? To answer these questions, we perform a regression analysis of a large sample of hourly real-time electricity-market price data from the California Independent System Operator (CAISO) for the 33-month sample period of April 2010–December 2012. Our analysis indicates that the 2013 shutdown of the state's San Onofre plant raised the CAISO real-time hourly market prices by $6/MWH to $9/MWH, and that the price increases could have been offset by a combination of demand reduction, increasing solar generation, and increasing wind generation. - Highlights: • Japan's disaster led to calls for shutting down existing nuclear plants. • We perform a regression analysis of California's real-time electricity-market prices. • We estimate that the San Onofre plant shutdown has raised the market prices by $6/MWH to $9/MWH. • The price increases could be offset by demand reduction and renewable generation increase

  19. Hanford Waste Vitrification Plant hydrogen generation

    International Nuclear Information System (INIS)

    King, R.B.; King, A.D. Jr.; Bhattacharyya, N.K.

    1996-02-01

    The most promising method for the disposal of highly radioactive nuclear wastes is a vitrification process in which the wastes are incorporated into borosilicate glass logs, the logs are sealed into welded stainless steel canisters, and the canisters are buried in suitably protected burial sites for disposal. The purpose of the research supported by the Hanford Waste Vitrification Plant (HWVP) project of the Department of Energy through Battelle Pacific Northwest Laboratory (PNL) and summarized in this report was to gain a basic understanding of the hydrogen generation process and to predict the rate and amount of hydrogen generation during the treatment of HWVP feed simulants with formic acid. The objectives of the study were to determine the key feed components and process variables which enhance or inhibit the.production of hydrogen. Information on the kinetics and stoichiometry of relevant formic acid reactions were sought to provide a basis for viable mechanistic proposals. The chemical reactions were characterized through the production and consumption of the key gaseous products such as H 2 . CO 2 , N 2 0, NO, and NH 3 . For this mason this research program relied heavily on analyses of the gases produced and consumed during reactions of the HWVP feed simulants with formic acid under various conditions. Such analyses, used gas chromatographic equipment and expertise at the University of Georgia for the separation and determination of H 2 , CO, CO 2 , N 2 , N 2 O and NO

  20. Prospects for solar thermal electricity generation - an introduction

    International Nuclear Information System (INIS)

    DeLaquil, P.

    1991-01-01

    The future potential for solar thermal electric power plants is quite significant. The size of the renewable energy resource base for the United States of America alone is almost 500 times its current primary energy consumption. Unfortunately, the levels of current utilization are quite small. Why have these technologies not made a larger contribution to today's market? The answer is that significant barriers still exist. (orig.)

  1. Potential for generation of public electricity in cane sugar factories

    Energy Technology Data Exchange (ETDEWEB)

    Torisson, T.

    1984-04-01

    Sugar cane is the most efficient crop for the conversion of solar energy into biomass. The possibility of conservation of energy in cane sugar producing countries by substituting bagasse for imported oil, was studied in Guyana, South America and financed by the World Bank. The concept of cogeneration was considered, where the heat energy generated by burning bagasse of high fiber content is converted into steam and used both for electricity generation and generation of internal power. Several methods of achieving energy efficiency in this process were discussed such as efficient generation and use of the steam by using high pressure boilers, drying and pelletization of bagasse, and using sugar cane trash as fuel. About 40% of the bagasse could be available for the generation of electric energy. A method for evaluation of the power potential showed that the quantity of public electricity produced, depended on certain important process parameters, fiber content, steam conditions and process steam. The cost effectiveness of the project increases with increasing fiber content in the sugar cane.

  2. Options of electric generation and sustainability; Opciones de generacion electrica y sustentabilidad

    Energy Technology Data Exchange (ETDEWEB)

    Martin del Campo M, C. [UNAM, Facultad de Ingenieria, Laboratorio de Analisis en Ingenieria de Reactores Nucleares, Paseo Cuauhnahuac 8532, Jiutepec, Morelos (Mexico)

    2004-07-01

    In this paper a study on the sustainability of the main electricity generation options is presented. The study is based on a matrix of sustainability indicators developed in Switzerland. A revision of some sustainability studies performed in countries with certain energy diversity and with experience in nuclear power plants operation, is done. Studies, in general, are performed for the power plant life cycle, taking into account economic aspects, fuel prices impact on electricity generation costs, fuel reserves indicators and material consumption. Air emission, waste production and human health impact data are also presented. All the results lead to confirm that nuclear energy has a high degree of sustainability vis a vis other options based on fossil fuels and renewable. Finally some comments are presented in order to highlight the importance that nuclear energy might have in the sustainable development of Mexico. (Author)

  3. The share of nuclear energy in the long-term electricity generation development in Poland

    International Nuclear Information System (INIS)

    Lipko, Krzysztof; Kwiatkowski, Mieczyslaw

    1999-01-01

    Polish power sector is currently undergoing rapid restructuring changes and according to new energy legislation electricity begins to be recognized as other tradable goods. Simultaneously an awareness of interdependencies between power generation expansion and a protection of the environment increases. Presented paper shows these interdependencies against the background of current and future electricity demand satisfying plans determined in Development Office of Polish Power Grid Company in the time range up to the year 2020. Special consideration is given to constraints assumed for power generation sector, relating to emissions of air pollutants, and their influence on possible changes in the mix of fuels used for power generation. In the first part of the paper an applied methodology of drawing up demand satisfying plans consistent with the rules of integrated resource planning (IRP) is described. Accepted macroeconomic assumptions (including these concerning electricity demand forecast) and development constraints related to emissions of air pollutants consistent with national legislation as well as signed international agreements are presented. The set of new generation technologies considered in development studies is described. Two scenarios of the power generation expansion plants developed for a high electricity demand growth are presented. One of them takes into account CO 2 emission constraint while the other neglects it. In the paper it is proved that the above constraint has great influence on the future mix of power plants. In the case when this constraint is taken into account the expansion of electricity generation beyond the year 2010 is based on technologies which do not increase CO 2 emissions, as for example, nuclear power. (author)

  4. Generation and management of waste electric vehicle batteries in China.

    Science.gov (United States)

    Xu, ChengJian; Zhang, Wenxuan; He, Wenzhi; Li, Guangming; Huang, Juwen; Zhu, Haochen

    2017-09-01

    With the increasing adoption of EVs (electric vehicles), a large number of waste EV LIBs (electric vehicle lithium-ion batteries) were generated in China. Statistics showed generation of waste EV LIBs in 2016 reached approximately 10,000 tons, and the amount of them would be growing rapidly in the future. In view of the deleterious effects of waste EV LIBs on the environment and the valuable energy storage capacity or materials that can be reused in them, China has started emphasizing the management, reuse, and recycling of them. This paper presented the generation trend of waste EV LIBs and focused on interrelated management development and experience in China. Based on the situation of waste EV LIBs management in China, existing problems were analyzed and summarized. Some recommendations were made for decision-making organs to use as valuable references to improve the management of waste EV LIBs and promote the sustainable development of EVs.

  5. Environmental Performance of Electricity Generation Based on Resources: A Life Cycle Assessment Case Study in Turkey

    Directory of Open Access Journals (Sweden)

    Zerrin Günkaya

    2016-10-01

    Full Text Available The aim of this paper was to determine how to change the environmental performance of electricity generation depending on the resources and their shares, in order to support decision-makers. Additionally, this paper presents an application of life cycle assessment (LCA methodology to determine the environmental burdens of electricity generation in Turkey. Electricity generation data in Turkey for the years 2012 and 2023 were used as a case study. The functional unit for electricity generation was 1 kWh. The LCA calculations were carried out using CML-IA (v3.00 data and the results were interpreted with respect to Monte Carlo simulation analysis (with the Monte Carlo function built in SimaPro 8.0.1 software. The results demonstrated that the fossil fuel consumption not only contributes to global warming, but it also has effects on the elemental basis of abiotic depletion due to raw material consumption for plant infrastructure. Additionally, it was observed that the increasing proportion of wind power in the electricity mix would also increase certain life cycle impacts (such as the elemental basis of abiotic depletion, human ecotoxicity, and terrestrial ecotoxicity in Turkey’s geography compared to increasing the share of other renewable energy sources, such as hydropower, geothermal, as well as solar.

  6. Estimating and decomposing productivity growth of the electricity generation industry in Malaysia: A stochastic frontier analysis

    International Nuclear Information System (INIS)

    See, Kok Fong; Coelli, Tim

    2013-01-01

    This study examines the total factor productivity (TFP) growth of the Malaysian electricity generation industry over the 1998 to 2005 period. The stochastic frontier analysis (SFA) approach is used to measure TFP change and decompose TFP growth into efficiency change and technical progress. We find that it achieved average annual TFP growth of 2.34%, with technical change contributing the most to the TFP growth over the eight year period. We hence hypothesise that the new power plants with their newer capital-embodied technologies commencing during the sample period are likely to be the main reason for this strong technical change. In addition, it is also noted that this estimate for the Malaysian electricity generation industry is larger than the estimate obtained for the electricity sector as a whole, where we obtain 1.34% per year for a comparable period. -- Highlights: •This is the first empirical study that examines the TFP growth of the Malaysian electricity generation industry using the SFA method. •An average annual TFP change of the Malaysian electricity generation industry over eight years (1998-2005) has been achieved at 2.34% per year. •The technical progress contributing the most to the TFP growth and technical efficiency change and scale change making small contributions over the sample period

  7. Floating nuclear power station of APWS-80 type for electricity generation and fresh water production

    International Nuclear Information System (INIS)

    Zverev, K.V.; Polunichev, V.I.; Sergeev, Yu.A.

    1997-01-01

    To solve the problem of seawater desalination and electric energy generation, the designing organizations of Russia have developed two variants of floating nuclear desalination plant. The KLT-40 type reactors, with maximum 160 MW thermal power, is used as the power source for such plant. Depending on the customer requirement one or two power unit could be installed in the floating desalination plant. There are APWS-80 with two reactors, producing 80,000 m 3 desalinated water per day and APWS-40 with one reactor, producing 40,000 m 3 desalinated water per day. The advantages of floating desalination plants are the possibility to build and test them at the ship-build plant of the supplier country and to hand them over on turnkey base. (author). 5 figs

  8. Investment in Electricity Generation and Transmission: Decision Making Under Uncertainty

    DEFF Research Database (Denmark)

    Conejo, Antonio J.; Baringo, Luis; Kazempour, Jalal

    This book provides an in-depth analysis of investment problems pertaining to electric energy infrastructure, including both generation and transmission facilities. The analysis encompasses decision-making tools for expansion planning, reinforcement, and the selection and timing of investment opti...... undergraduate and graduate students in the fields of electric energy systems, operations research, management science, and economics. Practitioners in the electric energy sector will also benefit from the concepts and techniques presented here.......This book provides an in-depth analysis of investment problems pertaining to electric energy infrastructure, including both generation and transmission facilities. The analysis encompasses decision-making tools for expansion planning, reinforcement, and the selection and timing of investment...... options. In this regard, the book provides an up-to-date description of analytical tools to address challenging investment questions such as: How can we expand and/or reinforce our aging electricity transmission infrastructure? How can we expand the transmission network of a given region to integrate...

  9. Targeting safety. Studying health and environmental impacts of electricity generation

    International Nuclear Information System (INIS)

    Carnino, A.; Niehaus, F.

    1999-01-01

    Today's energy planners and decision makers must consider complex and difficult questions particularly for the generation of electricity. The factors at play are related to the entire fuel chain of the energy source, including technical and economic performance and health and environmental impacts. While costs remain a key factor, they must be measured in comparative ways. This fact, together with the needs of many countries to define their energy and electricity programs in a sustainable manner, has provided the basis for a growing interest in comparative assessment of different electricity generation options, especially from environmental and human health points of view. Against this backdrop, the IAEA has been supporting various activities in this field, namely: International Symposium on Health impacts of Different Sources of Energy in 1981; International Symposium on the Risks and benefits of Energy Systems, in 1984; Senior Expert Symposium on Electricity and the Environment in 1991; International Symposium on Electricity, Health and the Environment: Comparative Assessment in Support of Decision making in 1995

  10. Federal tax incentives and disincentives for the adoption of wood-fuel electric-generating technologies

    International Nuclear Information System (INIS)

    Hill, L.J.; Hadley, S.W.

    1995-01-01

    In this paper, we estimate the effects of current federal tax policy on the financial criteria that investor-owned electric utilities (IOUs) and non-utility electricity generators (NUGs) use to evaluate wood-fuel electric-generating technologies, distinguishing between dedicated-plantation and wood-waste fuels. Accelerated tax depreciation, the 1.5 cent/kWh production tax credit for the dedicated-plantation technology, and the alternative minimum tax are the most important tax provisions. The results indicate that federal tax laws have significantly different effects on the evaluation criteria, depending on the plant's ownership (IOU vs NUG) and type of fuel (dedicated-plantation vs wood-waste). (Author)

  11. Cernavoda NPP Unit 1 - a plant of several generations

    International Nuclear Information System (INIS)

    Rotaru, I.; Metes, M.; Anghelescu, M.S.

    2000-01-01

    Cernavoda NPP Unit 1, the first nuclear power unit in Romania, has a long and tormented history. It represents a rather unique case in Eastern Europe. The project started well before 1989 (the construction phase lasted 17 years and generations were involved in its completion), but it is effectively based on western technology (Candu). Meanwhile, the national nuclear program underwent many changes, affecting the lives and careers of Romanian nuclear professionals. Finally, on December 2 nd 1996, the unit began its c ommercial operation , being operated at its nominal power rating of 706 MW e . It now provides a reliable source of electricity for Romanian economy, supplying to the national grid about 10% of the country's average annual demand. The paper reflects some aspects related to the shift of generations during the project's development, including the present stage. The operational performances achieved 'in service' by Cernavoda NPP Unit 1 up to the end of 1999 , are also presented. Reference to the electrical energy production, performance indicators, production costs, nuclear safety, radiation protection, radioactive wastes, nuclear fuel consumption and nuclear fuel performances are included. Comparisons are performed with similar indicators reported by other worldwide nuclear power plants, in order to assess our results. (authors)

  12. Blown by the wind. Replacing nuclear power in German electricity generation

    International Nuclear Information System (INIS)

    Lechtenböhmer, Stefan; Samadi, Sascha

    2013-01-01

    Only three days after the beginning of the nuclear catastrophe in Fukushima, Japan, on 11 March 2011, the German government ordered 8 of the country's 17 existing nuclear power plants (NPPs) to stop operating within a few days. In summer 2011 the government put forward a law – passed in parliament by a large majority – that calls for a complete nuclear phase-out by the end of 2022. These government actions were in contrast to its initial plans, laid out in fall 2010, to expand the lifetimes of the country's NPPs. The immediate closure of 8 NPPs and the plans for a complete nuclear phase-out within little more than a decade, raised concerns about Germany's ability to secure a stable supply of electricity. Some observers feared power supply shortages, increasing CO 2 -emissions and a need for Germany to become a net importer of electricity. Now – a little more than a year after the phase-out law entered into force – this paper examines these concerns using (a) recent statistical data on electricity production and demand in the first 15 months after the German government's immediate reaction to the Fukushima accident and (b) reviews the most recent projections and scenarios by different stakeholders on how the German electricity system may develop until 2025, when NPPs will no longer be in operation. The paper finds that Germany has a realistic chance of fully replacing nuclear power with additional renewable electricity generation on an annual basis by 2025 or earlier, provided that several related challenges, e.g. expansion of the grids and provision of balancing power, can be solved successfully. Already in 2012 additional electricity generation from renewable energy sources in combination with a reduced domestic demand for electricity will likely fully compensate for the reduced power generation from the NPPs shut down in March 2011. If current political targets will be realised, Germany neither has to become a net electricity importer, nor will be unable

  13. Comparative costs of coal and nuclear-generated electricity in the united states

    International Nuclear Information System (INIS)

    Brandfon, W.W.

    1987-01-01

    This paper compares the future first-year operating costs and lifetime levelized costs of producing baseload coal- and nuclear-generated electricity under schedules shorter than those recently experienced at U.S. plants. Nuclear appears to have a clear economic advantage. Coal is favorable only when it is assumed that the units will operate at very low capacity factors and/or when the capital cost differential between nuclear and coal is increased far above the recent historical level. Nuclear is therefore a cost-competitive electric energy option for utilities and should be considered as an alternative to coal when large baseload capacity is required. (author)

  14. Enhanced boron removal by electricity generation in a microbial fuel cell

    OpenAIRE

    Ping, Qingyun; Abu-Reesh, Ibrahim M.; He, Zhen

    2016-01-01

    Boron needs to be removed during desalination, because excessive boron in the product water for irrigation can deteriorate plant growth. In this study, a microbial fuel cell (MFC) equipped with anion exchange membrane (AEM) was proposed and investigated to remove boron via two successive steps: boric acid is ionized to borate ions in the presence of high pH as a result of cathode reaction, and borate ions are transported across AEM driven by electricity generation. Two scenarios were examined...

  15. What drives the efficiency of hard coal fuelled electricity generation? : an empirical assessment

    OpenAIRE

    Hoffmann, Tim; Voigt, Sebastian

    2009-01-01

    The efficiency of electricity generation in hard coal fired power plants varies considerably from country to country and over time. These differences occur both between developing and developed countries and between industrialised nations. The econometric analysis presented in this paper tests for the reasons of these discrepancies. In this examination abundance of hard coal and the price of hard coal are the two variables of our major interest. We assume that countries with an abundance of h...

  16. Wind energy for electricity generation in Sri Lanka

    Energy Technology Data Exchange (ETDEWEB)

    Fernando, W.J.

    1988-01-01

    Different aspects of the island Sri Lanka are discussed in relation to the use of wind energy to generate electric power. The electricity demand and supply are dealt with as well as geo-climatic features. Wind resources in different parts of Sri Lanka are determined. Further study is needed to achieve more data on wind potential and wind speeds. Finally a case study is discussed, carried out to assess the feasibility of integration of wind and hydro resources in combination to meet a predetermined load to be used in an optimal configuration. 7 figs., 1 tab.

  17. Electricity generation in Ghana : the role of the chemist

    International Nuclear Information System (INIS)

    Amuasi, J.H.; Ephraim, J.H.; Glover, E.T.; Fletcher, J.J.

    1998-01-01

    The current electricity crisis in Ghana has mandated a holistic approach towards meeting the energy demand of the country. In this paper, a brief review of the various technologies for electricity generation is presented and the role of the chemist in each technology is identified. An emphasis is placed on the nuclear option as a plausible component of a comprehensive energy portfolio and the role of the chemist in each step of the nuclear fuel cycle is outlined. The challenges facing the chemists in the country are enumerated and recommendations for ensuring the incorporation of the nuclear option into the total energy mix of the country are presented. (author)

  18. Strategies and options for electricity generation in Egypt up to 2020

    International Nuclear Information System (INIS)

    Yassin, I. M.; Megahed, M. M.; Motayasser, S. S.

    2004-01-01

    Over the period 1970-2000, the total primary energy requirements in Egypt have increased from 7.8 million tones of oil equivalent (Mtoe) to 44.2 Mtoe. In the same period, electricity generation has increased from 6.7 TWh to 73.3 TWh. The demand for both primary energy and electricity is expected to continue at higher growth rates in the future due to the ambitious governmental plans aiming at increasing the gross domestic product (GDP) at an average annual growth rate of 8% up to the year 2020. Because of the limited fossil fuel energy resources and the almost fully utilized hydro energy, Egypt has been considering for sometime the various options for satisfying the increasing demand for electricity, including nuclear energy. To this end, the Nuclear Power Plants Authority carried out a comparative study of the various strategies and options for electricity generation in Egypt with technical assistance from the International Atomic Energy Agency (IAEA) utilizing the DECADES Tool. The main objective of the study was to determine the optimal electricity generation mix up to the year 2020, including nuclear and renewable (solar and wind) energies. DECADES is restricted by some limitation that it did not take into its consideration modeling of some energy forms and systems such as simulation of Renewable Energy Options (REO), in particular thermal/solar and wind plants and simulation of Independent Power Producers (IPP). REO and IPP, as well as the nuclear energy option are expected to play an important role in the future electricity generation mix in Egypt. Therefore it is important to consider its effects economically and environmentally when studying the best expansion system in Egypt. This paper presents the modifications for DECADES modeling to enable simulation for the above energy forms and systems, as well as the results of the comparative assessment study.(author)

  19. Key factors for assessing climate benefits of natural gas versus coal electricity generation

    International Nuclear Information System (INIS)

    Zhang, Xiaochun; Caldeira, Ken; Myhrvold, Nathan P

    2014-01-01

    Assessing potential climate effects of natural gas versus coal electricity generation is complicated by the large number of factors reported in life cycle assessment studies, compounded by the large number of proposed climate metrics. Thus, there is a need to identify the key factors affecting the climate effects of natural gas versus coal electricity production, and to present these climate effects in as clear and transparent a way as possible. Here, we identify power plant efficiencies and methane leakage rates as the factors that explain most of the variance in greenhouse gas emissions by natural gas and coal power plants. Thus, we focus on the role of these factors in determining the relative merits of natural gas versus coal power plants. We develop a simple model estimating CO 2 and CH 4 emissions from natural gas and coal power plants, and resulting temperature change. Simple underlying physical changes can be obscured by abstract evaluation metrics, thus we focus our analysis on the time evolution of global mean temperature. We find that, during the period of plant operation, if there is substantial methane leakage, natural gas plants can produce greater near-term warming than coal plants with the same power output. However, if methane leakage rates are low and power plant efficiency is high, natural gas plants can produce some reduction in near-term warming. In the long term, natural gas power plants produce less warming than would occur with coal power plants. However, without carbon capture and storage natural gas power plants cannot achieve the deep reductions that would be required to avoid substantial contribution to additional global warming. (letter)

  20. Efficiency Investigation of Electrical Generator-Converter Set

    Science.gov (United States)

    Leuchter, Jan; Bauer, Pavol

    The efficiency of the electrical GEN-SET (EGS) for speeds with diesel generator (∼3000rpm) and feasibility of high-speed generator with gas turbine (∼30000rpm) and permanent magnet synchronous generator is investigated. Three different configurations of power converter are considered. The paper given an answer to the question if a a full controlled rectifier should be employed or a version with diode rectifier is satisfactory? This is investigated also for high-speed generation. Different current forms for the three defined configurations with their harmonics and influence on generator is given. The efficiency of the overall system is here investigated and an optimal topology is selected. Since the EGS operates very often under low load which does not exceed in average more than 30% of the rated permanent load, a new topology of converter of EGS with high efficiency and low cost is suggested and studied theoretically and experimentally in the paper.

  1. In 2002 nuclear power plants generated 2575 TWh

    International Nuclear Information System (INIS)

    Anon.

    2003-01-01

    In 2002 nuclear power plants produced 2575 TWh throughout the world. At the end of 2002, 441 reactors were operating in 31 countries and 32 were being built in 12 countries (India (7), China (4), Ukraine (4), Japan (3), Russia (3), Iran (2), Slovakia (2), South-Korea (2), Taiwan (2), Argentina (1), North-Korea (1) and Rumania (1). In 2002, 6 reactors came into operation : Qinshan-III-1, Qinshan-II-1, Lingao-I and Lingao-II in China, Yongwang-6 in South-Korea, and Temelin-2 in the Czech Republic. In the same period 4 reactors were decommissioned: 2 in U.K. (Bradwell) and 2 in Bulgaria (Kozloduy-1 and -2). In 2002 nuclear energy generated more than 40% of the electrical power production in 9 countries: Lithuania, France, Slovakia, Belgium, Bulgaria, Sweden, Ukraine, Slovenia and Armenia. (A.C.)

  2. The Contribution of Electricity Generation to Greenhouse Effect

    International Nuclear Information System (INIS)

    Lubis, Erwansyah

    2008-01-01

    The development activities has successfully increasing the human kind, but also has increasing trend the planet changes radically, because of the greenhouse effect (GHE), decreasing ozone layer and acid rain, that all could treat the living of the species-species and including man inside. The electricity generation and transportation are the main contribution of greenhouse gas (GHG), reaching 1/3 of global emission. Base on the Kyoto protocol in 1997, that all countries, alone or together agree to reduce the emission of GG of 5.2 % under the emission of the 1990. The decreasing of GHG could be reached by implementing the technology generation that contain low carbon, such a natural gas, hydro power, wind, solar and nuclear power. Diversification of electricity generation has to take into a count of environmental capacity, so the supply stability and sustainable development could be reached. The IAEA results studies indicated that the emission factor of fossil fuel 2 times greater compare to the natural gas. The emission factor of wind and biomass lie between solar and nuclear power. In the electricity generation chain, nuclear power emit the 25 g of CO 2 /kWh compare to fossil fuel emit 250 - 1250 g CO 2 /kWh. (author)

  3. MEMS CLOSED CHAMBER HEAT ENGINE AND ELECTRIC GENERATOR

    Science.gov (United States)

    Landis, Geoffrey A. (Inventor)

    2005-01-01

    A heat engine, preferably combined with an electric generator, and advantageously implemented using micro-electromechanical system (MEMS) technologies as an array of one or more individual heat engine/generators. The heat engine is based on a closed chamber containing a motive medium, preferably a gas; means for alternately enabling and disabling transfer of thermal energy from a heat source to the motive medium; and at least one movable side of the chamber that moves in response to thermally-induced expansion and contraction of the motive medium, thereby converting thermal energy to oscillating movement. The electrical generator is combined with the heat engine to utilize movement of the movable side to convert mechanical work to electrical energy, preferably using electrostatic interaction in a generator capacitor. Preferably at least one heat transfer side of the chamber is placed alternately into and out of contact with the heat source by a motion capacitor, thereby alternately enabling and disabling conductive transfer of heat to the motive medium.

  4. Evaluation and Ranking of Geothermal Resources for Electrical Generation or Electrical Offset in Idaho, Montana, Oregon and Washington. Volume II.

    Energy Technology Data Exchange (ETDEWEB)

    Bloomquist, R. Gordon

    1985-06-01

    This volume contains appendices on: (1) resource assessment - electrical generation computer results; (2) resource assessment summary - direct use computer results; (3) electrical generation (high temperature) resource assessment computer program listing; (4) direct utilization (low temperature) resource assessment computer program listing; (5) electrical generation computer program CENTPLANT and related documentation; (6) electrical generation computer program WELLHEAD and related documentation; (7) direct utilization computer program HEATPLAN and related documentation; (8) electrical generation ranking computer program GEORANK and related documentation; (9) direct utilization ranking computer program GEORANK and related documentation; and (10) life cycle cost analysis computer program and related documentation. (ACR)

  5. Evaluation and ranking of geothermal resources for electrical generation or electrical offset in Idaho, Montana, Oregon and Washington, volume 2

    Science.gov (United States)

    Bloomquist, F. G.

    1985-06-01

    Appendices are given on: (1) resource assessments of electrical generation computer results; (2) a resource assessment summary of direct use computer results; (3) an electrical generation (high temperature) resource assessment computer program listing; (4) a direct utilization (low temperature) resource assessment computer program listing; (5) an electrical generation computer program CENTPLANT and related documentation; (6) an electrical generation computer program WELLHEAD and related documentation; (7) a direct utilization computer program HEATPLAN and related documentation; (8) an electrical generation ranking computer program GEORANK and related documentation; (9) a direct utilization ranking computer program GEORANK and related documentation; and (10) a life cycle cost analysis computer program and related documentation.

  6. Reliability payments to generation capacity in electricity markets

    International Nuclear Information System (INIS)

    Olsina, Fernando; Pringles, Rolando; Larisson, Carlos; Garcés, Francisco

    2014-01-01

    Electric power is a critical input to modern economies. Generation adequacy and security of supply in power systems running under competition are currently topics of high concern for consumers, regulators and governments. In a market setting, generation investments and adequacy can only be achieved by an appropriate regulatory framework that sets efficient remuneration to power capacity. Theoretically, energy-only electricity markets are efficient and no additional mechanism is needed. Nonetheless, the energy-only market design suffers from serious drawbacks. Therefore, jointly with the evolution of electricity markets, many remunerating mechanisms for generation capacity have been proposed. Explicit capacity payment was the first remunerating approach implemented and perhaps still the most applied. However, this price-based regulation has been applied no without severe difficulties and criticism. In this paper, a new reliability payment mechanism is envisioned. Capacity of each generating unit is paid according to its effective contribution to overall system reliability. The proposed scheme has many attractive features and preserves the theoretical efficiency properties of energy-only markets. Fairness, incentive compatibility, market power mitigation and settlement rules are investigated in this work. The article also examines the requirements for system data and models in order to implement the proposed capacity mechanism. A numerical example on a real hydrothermal system serves for illustrating the practicability of the proposed approach and the resulting reliability payments to the generation units. - Highlights: • A new approach for remunerating supply reliability provided by generation units is proposed. • The contribution of each generating unit to lessen power shortfalls is determined by simulations. • Efficiency, fairness and incentive compatibility of the proposed reliability payment are assessed

  7. Electrical Power Conversion of River and Tidal Power Generator

    Energy Technology Data Exchange (ETDEWEB)

    Muljadi, Eduard; Gevorgian, Vahan; Wright, Alan; Donegan, James; Marnagh, Cian; McEntee, Jarlath

    2016-11-21

    As renewable generation has become less expensive during recent decades, and it becomes more accepted by the global population, the focus on renewable generation has expanded to include new types with promising future applications, such as river and tidal generation. Although the utilization of power electronics and electric machines in industry is phenomenal, the emphasis on system design is different for various sectors of industry. In precision control, robotics, and weaponry, the design emphasis is on accuracy and reliability with less concern for the cost of the final product. In energy generation, the cost of energy is the prime concern; thus, capital expenditures (CAPEX) and operations and maintenance expenditures (OPEX) are the major design objectives. This paper describes the electrical power conversion aspects of river and tidal generation. Although modern power converter control is available to control the generation side, the design was chosen on the bases of minimizing the CAPEX and OPEX; thus, the architecture is simple and modular for ease of replacement and maintenance. The power conversion is simplified by considering a simple diode bridge and a DC-DC power converter to take advantage of abundant and low-cost photovoltaic inverters that have well-proven grid integration characteristics (i.e., the capability to produce energy with good power quality and control real power and voltage on the grid side).

  8. Electricity generation and environmental externalities: Case studies, September 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-28

    Electricity constitutes a critical input in sustaining the Nation`s economic growth and development and the well-being of its inhabitants. However, there are byproducts of electricity production that have an undesirable effect on the environment. Most of these are emissions introduced by the combustion of fossil fuels, which accounts for nearly 70 percent of the total electricity generated in the United States. The environmental impacts (or damages) caused by these emissions are labeled environmental ``externalities.`` Included in the generic term ``externality`` are benefits or costs resulting as an unintended byproduct of an economic activity that accrue to someone other than the parties involved in the activity. This report provides an overview of the economic foundation of externalities, the Federal and State regulatory approaches, and case studies of the impacts of the externality policies adopted by three States.

  9. 76 FR 11436 - Application to Export Electric Energy; Ontario Power Generation

    Science.gov (United States)

    2011-03-02

    ... Generation AGENCY: Office of Electricity Delivery and Energy Reliability, DOE. ACTION: Notice of Application. SUMMARY: Ontario Power Generation Inc. (OPG) has applied to renew its authority to transmit electric... Affairs and Corporate Strategy, Ontario Power Generation Inc., [[Page 11437

  10. Assessment of electrical equipment aging for nuclear power plant

    International Nuclear Information System (INIS)

    Minakawa, Takefumi

    2011-01-01

    The electrical and instrumentation equipment, especially whose parts are made of polymer material, are degraded by thermal and radiation environment gradually in the normal operation, and the degradation is thought to progress rapidly when exposed to the environment of the design basis event (DBE). The integrity of the equipment is evaluated by the environmental qualification (EQ) test simulating the environment of the normal operation and the DBE. The outcome of the project of 'Assessment of Cable Aging for Nuclear Power Plants' (ACA, 2002-2008), indicated that it is important to expose the test specimens to both thermal and radiation condition at the same to simulate the aging in normal operation. The project of 'Assessment of Electrical Equipment Aging for Nuclear Power Plants' (AEA) was initiated in FY2008 to apply the outcome of ACA to the other electrical and instrumentation equipment and to establish an advanced EQ test method that can appropriately simulate the environment in actual plants. In FY2010, aging characteristics of thermal aging and simultaneous aging were obtained for the epoxy resin of electrical penetrations and the O-ring of connectors, and the advanced EQ test guide for electrical penetration was established. In addition, aging evaluation tests in accordance with the guide were conducted for electrical penetration simulating the operation of 40, 60, and 80 years. (author)

  11. Results from the OECD report on international projections of electricity generating costs

    International Nuclear Information System (INIS)

    Paffenbarger, J.A.; Bertel, E.

    1998-01-01

    The International Energy Agency and Nuclear Energy Agency of the OECD have periodically undertaken a joint study on electricity generating costs in OECD Member countries and selected non-Member countries. This paper presents key results from the 1998 update of this study. Experts from 19 countries drawn from electric utility companies and government provided data on capital costs, operating and maintenance costs, and fuel costs from which levelized electricity generating costs (US cents/kWh) for baseload power plants were estimated in each country using a common set of economic assumptions. Light water nuclear power plants, pulverized coal plants, and natural gas-fired combined cycle gas turbines were the principal options evaluated. five and 10% discount rates, 40-year operating lifetime, and 75% annual load factor were the base assumptions, with sensitivity analyses on operating lifetime and load factor. Fuel costs and fuel escalation were provided individually by country, with a sensitivity case to evaluate costs assuming no real fuel price escalation over plant lifetimes. Of the three principal fuel/technology options, none is predominantly the cheapest option for all economic assumptions. However, fossil-fueled options are generally estimated to be the least expensive option. The study confirms that gas-fired combined cycles have improved their economic performance in most countries in recent years and are strong competitors to nuclear and coal-fired plants. Eleven out of the 18 countries with two or more options show gas-fired plants to be the cheapest option at 10% discount rate. Coal remains a strong competitor to gas when lower discount rates are used. Nuclear is the least expensive at both 5 and 10% discount rate in only two countries. Generally, with gas prices above 5 US$/GJ, nuclear plants constructed at overnight capital costs below 1 650 $/kWe have the potential to be competitive only at lower discount rates

  12. Optimal bidding in Turkey day ahead electricity market for wind energy and pumped storage hydro power plant

    OpenAIRE

    Ceyhun Yıldız; Mustafa Şekkeli

    2016-01-01

    In electrical grid; when the demand power increases energy prices increase, when the demand decreases energy prices decrease. For this reason; to increase the total daily income, it is required to shift generations to the hours that high demand power values occurred. Wind Power Plants (WPP) have unstable and uncontrollable generation characteristic. For this reason, energy storage systems are needed to shift the generations of WPPs in time scale. In this study, four wind power plants (WPP) wh...

  13. Investment and deregulation in the electricity generation industry

    International Nuclear Information System (INIS)

    Peluchon, B.

    2007-12-01

    This work addresses the issue of investment in the electricity generation industry. As the analysis of many crisis which have affected electricity markets shows, there is a systematic under-investment in peak capacity. Electricity prices are not high enough to cover fixed costs of such generators, a phenomenon that has been dubbed 'missing money' in some recent papers (Stoft). The investment decisions of a duo-poly facing random demand are then compared to those of a public monopoly. The results are that no prices may be high enough to solve the 'missing money' problem, since the duo-poly is able to exercise market power in order to maximize his profit. This results systematically in fewer peak capacity in the duo-poly case than in the public monopoly case. This remains true in the case of a n-oligopoly. The necessity of designing a mechanism remunerating capacity is thus demonstrated. Capacity markets are then analysed in the light of those results. What appears is that operating reserves are a public good and, as such, prevents capacity markets to solve the 'missing money' problem. This casts a shadow on the pursuit of deregulation in the electricity industry. (author)

  14. Impact of GB transmission charging on renewable electricity generation

    International Nuclear Information System (INIS)

    2006-01-01

    The Government is committed to meeting its objective of producing 10% of UK electricity supplies from renewable sources by 2010, subject to the cost to the consumer being acceptable. It is generally believed that northern Scotland - and the Highlands and Islands in particular - will be a significant source of renewable energy in future, mostly in the form of wind power; wave and tidal energy may also be important. The National Grid Company (NGC) is responsible for formulating a cost-reflective and. non-discriminatory electricity transmission charging methodology for Great Britain (GB). This determines Transmission Network Use of System (TNUoS) tariffs, which are paid by transmission-connected generators and suppliers for the use of the high voltage transmission network. Following the publication of National Grid Company's 'GB Transmission Charging: Initial Thoughts' document on 16 December 2003, there was particular concern that the level of future Transmission Network Use of System (TNUoS) tariffs in northern Scotland might impede the achievement of the Government's 2010 target for renewable electricity supplies. That document and subsequent revisions indicate that generation TNUoS charges in northern Scotland were likely to be significantly higher than anywhere else in GB. The study attempts to quantify the effect of the proposed GB-wide TNUoS charging methodology on the future growth of renewable electricity so as to ascertain the impact on the likelihood of meeting the Government's 2010 target. (UK)

  15. Microgrids in the Evolving Electricity Generation and DeliveryInfrastructure

    Energy Technology Data Exchange (ETDEWEB)

    Marnay, Chris; Venkataramanan, Giri

    2006-02-01

    The legacy paradigm for electricity service in most of the electrified world today is based on the centralized generation-transmission-distribution infrastructure that evolved under a regulated environment. More recently, a quest for effective economic investments, responsive markets, and sensitivity to the availability of resources, has led to various degrees of deregulation and unbundling of services. In this context, a new paradigm is emerging wherein electricity generation is intimately embedded with the load in microgrids. Development and decay of the familiar macrogrid is discussed. Three salient features of microgrids are examined to suggest that cohabitation of micro and macro grids is desirable, and that overall energy efficiency can be increased, while power is delivered to loads at appropriate levels of quality.

  16. Electricity generation from landfill gas: a commercial view revisited

    International Nuclear Information System (INIS)

    Limbrick, A.J.

    1992-01-01

    Wapsey's Wood power station has been generating electricity from landfill gas since 1987. Despite a good technical track record, the project did not secure a fair price for the electricity it sold until it was included in the 1991 Non-Fossil Fuel Obligation (NFFO). The NFFO has served to bring forward approximately 560 MW of renewable energy generating capacity, of which 15 per cent is fuelled by landfill gas. However, case histories such as that of Wapsey's Wood highlight the weaknesses of the current arrangements. To secure the continued steady growth of commercially robust renewable energy projects, there is a need to boost the business confidence of potential developers. The paper proposes two ways to remove the present uncertainty: simplify the application procedures, and remove the December 1998 expiry date that currently applies to power purchase agreements under the NFFO. (author)

  17. Role of electric discharges in the generation of atmospheric vortices

    Science.gov (United States)

    Sinkevich, O. A.; Maslov, S. A.; Gusein-zade, N. G.

    2017-02-01

    The existing thermohydrodynamic and hydroelectromagnetic models of tornado are considered. The potentialities of the humid atmosphere as a heat engine generating air vortices are analyzed in detail. The ability of long-term atmospheric electric discharges to form a tornado funnel and create an initial twist of up to 10-3-10-2 s-1 in it are estimated. The possible effect of a lightning discharge on the initiation and evolution of the tornado is discussed. It is shown that the electric current flowing along the lightning channel can lead to helical instability and generation of a weak primary vortex. The channel formed in the atmosphere by a lightning discharge and the vortex motion of the parent thundercloud can enhance the primary vortex and promote its transformation into a tornado. Possible mechanisms of enhancement of the primary vortex created by a lightning discharge and the possibility of its transformation into a tornado in the postdischarge stage are discussed.

  18. Net energy analysis of different electricity generation systems

    International Nuclear Information System (INIS)

    1994-07-01

    This document is a report on the net energy analysis of nuclear power and other electricity generation systems. The main objectives of this document are: To provide a comprehensive review of the state of knowledge on net energy analysis of nuclear and other energy systems for electricity generation; to address traditional questions such as whether nuclear power is a net energy producer or not. In addition, the work in progress on a renewed application of the net energy analysis method to environmental issues is also discussed. It is expected that this work could contribute to the overall comparative assessment of different energy systems which is an ongoing activity at the IAEA. 167 refs, 9 figs, 5 tabs

  19. Life Cycle Assessment of electricity generation: overview and methodological issues

    DEFF Research Database (Denmark)

    Turconi, Roberto; Boldrin, Alessio; Astrup, Thomas Fruergaard

    Electricity production is currently responsible for a large share of global Greenhouse Gas (GHG), NOx and SO2 emissions, and their related environmental impacts. This study provides a critical review of the status of research on life cycle assessment (LCA) of electricity generation. NREL [1...... study focuses on the comparability between different technologies, identifying and quantifying the possible mistakes that can occur when comparing two technologies whose environmental assessments have been performed with conflicting assumptions. Nine different power generation technologies were examined......: hard coal, lignite, natural gas, oil, nuclear, biomass, hydroelectric, solar photovoltaic and wind. More than 150 published studies were selected and analyzed to investigate whether "typical" GHG, NOx and SO2 emission factors for each technology could be identified. For a better overview of the sources...

  20. Second generation plant health clinics in Uganda

    OpenAIRE

    Danielsen, Solveig; Matsiko, Frank; Mutebi, Emmanuel; Karubanga, Gabriel

    2012-01-01

    The purpose of the present study was to assess the performance of plant clinics in Uganda and to identify system factors that are conducive or constraining to clinic performance. Our analytical framework was derived from the health system model of World Health Organisation (WHO), designed to measure performance and health outcomes. The modified plant health system model was based on six system components: Service delivery, Plant health workforce, Plant health information, Input supply, Financ...

  1. World electricity generation, nuclear power, and oil markets

    International Nuclear Information System (INIS)

    1990-01-01

    Striking changes have characterized the world's production and use of energy over the past 15 years. Most prominent have been the wide price fluctuations, politicization of world oil prices and supply, along with profound changes in patterns of production and consumption. This report, based on a study by energy analysts at Science Concepts, Inc., in the United States, traces changes in world energy supply since 1973-74 - the time of the first oil ''price shocks''. In so doing, it identifies important lessons for the future. The study focused in particular on the role of the electric power sector because the growth in fuel use in it has been accomplished without oil. Instead, the growth has directly displaced oil. In the pre-1973 era, the world relied increasingly on oil for many energy applications, including the production of electricity. By 1973, more than on-fourth of the world's electricity was produced by burning oil. By 1987, however, despite a large increase in electric demand, the use of oil was reigned back to generating less than 10% of the world's electricity. Nuclear power played a major role in this turnaround. From 1973-87, analysts at Science Concepts found, nuclear power displaced the burning of 11.7 billion barrels of oil world-wide and avoided US $323 billion in oil purchases

  2. Biomass assessment and small scale biomass fired electricity generation in the Green Triangle, Australia

    International Nuclear Information System (INIS)

    Rodriguez, Luis C.; May, Barrie; Herr, Alexander; O'Connell, Deborah

    2011-01-01

    Coal fired electricity is a major factor in Australia's greenhouse gas emissions (GHG) emissions. The country has adopted a mandatory renewable energy target (MRET) to ensure that 20% of electricity comes from renewable sources by 2020. In order to support the MRET, a market scheme of tradable Renewable Energy Certificates (RECs) has been implemented since 2001. Generators using biomass from eligible sources are able to contribute to GHG emission reduction through the substitution of coal for electricity production and are eligible to create and trade RECs. This paper quantifies the potential biomass resources available for energy generation from forestry and agriculture in the Green Triangle, one of the most promising Australian Regions for biomass production. We analyse the cost of electricity generation using direct firing of biomass, and estimate the required REC prices to make it competitive with coal fired electricity generation. Major findings suggest that more than 2.6 million tonnes of biomass are produced every year within 200 km of the regional hub of Mount Gambier and biomass fired electricity is viable using feedstock with a plant gate cost of 46 Australian Dollars (AUD) per tonne under the current REC price of 34 AUD per MWh. These findings are then discussed in the context of regional energy security and existing targets and incentives for renewable energies. -- Highlights: → We assessed the biomass production in the Green Triangle. → 2.6 million tonnes of biomass per year are produced within 200 km from Mt Gambier. → Renewable Energy Certificates makes bioenergy competitive with coal electricity. → At a REC price of 34 AUD, biomass of up to 46 AUD/tonne might be used for bionergy

  3. Principles of tariff determination for NPP electric power generation

    International Nuclear Information System (INIS)

    Ratnikov, B.E.; Gitel'man, L.D.; Artemov, Yu.N.; Fiantsev, V.S.

    1988-01-01

    Foundations of price-setting and order of accounting arrangement for NPP electric power are considered. NPP tariffs are established proceeding from standard costs of power generation. The standards are differentiated as to NPP groups, depending on technical, regional and natural geographic factors, taking into account the facility type, unit capacity and the number of similar NPP units. The conclusion is made that under conditions of NPP economic independence expansion and creation of prerequisites for going over to self-financing principles and also due to the qualitatively new stage of nuclear power generation development the level of efficiency, forseen by the tariffs, should be increased

  4. Marginal Emissions Factors for Electricity Generation in the Midcontinent ISO.

    Science.gov (United States)

    Thind, Maninder P S; Wilson, Elizabeth J; Azevedo, Inês L; Marshall, Julian D

    2017-12-19

    Environmental consequences of electricity generation are often determined using average emission factors. However, as different interventions are incrementally pursued in electricity systems, the resulting marginal change in emissions may differ from what one would predict based on system-average conditions. Here, we estimate average emission factors and marginal emission factors for CO 2 , SO 2 , and NO x from fossil and nonfossil generators in the Midcontinent Independent System Operator (MISO) region during years 2007-2016. We analyze multiple spatial scales (all MISO; each of the 11 MISO states; each utility; each generator) and use MISO data to characterize differences between the two emission factors (average; marginal). We also explore temporal trends in emissions factors by hour, day, month, and year, as well as the differences that arise from including only fossil generators versus total generation. We find, for example, that marginal emission factors are generally higher during late-night and early morning compared to afternoons. Overall, in MISO, average emission factors are generally higher than marginal estimates (typical difference: ∼20%). This means that the true environmental benefit of an energy efficiency program may be ∼20% smaller than anticipated if one were to use average emissions factors. Our analysis can usefully be extended to other regions to support effective near-term technical, policy and investment decisions based on marginal rather than only average emission factors.

  5. Automation of steam generator services at public service electric & gas

    Energy Technology Data Exchange (ETDEWEB)

    Cruickshank, H.; Wray, J.; Scull, D. [Public Service Electric & Gas, Hancock`s Bridge, NJ (United States)

    1995-03-01

    Public Service Electric & Gas takes an aggressive approach to pursuing new exposure reduction techniques. Evaluation of historic outage exposure shows that over the last eight refueling outages, primary steam generator work has averaged sixty-six (66) person-rem, or, approximately tewenty-five percent (25%) of the general outage exposure at Salem Station. This maintenance evolution represents the largest percentage of exposure for any single activity. Because of this, primary steam generator work represents an excellent opportunity for the development of significant exposure reduction techniques. A study of primary steam generator maintenance activities demonstrated that seventy-five percent (75%) of radiation exposure was due to work activities of the primary steam generator platform, and that development of automated methods for performing these activities was worth pursuing. Existing robotics systems were examined and it was found that a new approach would have to be developed. This resulted in a joint research and development project between Westinghouse and Public Service Electric & Gas to develop an automated system of accomplishing the Health Physics functions on the primary steam generator platform. R.O.M.M.R.S. (Remotely Operated Managed Maintenance Robotics System) was the result of this venture.

  6. Electric generation and ratcheted transport of contact-charged drops

    Science.gov (United States)

    Cartier, Charles A.; Graybill, Jason R.; Bishop, Kyle J. M.

    2017-10-01

    We describe a simple microfluidic system that enables the steady generation and efficient transport of aqueous drops using only a constant voltage input. Drop generation is achieved through an electrohydrodynamic dripping mechanism by which conductive drops grow and detach from a grounded nozzle in response to an electric field. The now-charged drops are transported down a ratcheted channel by contact charge electrophoresis powered by the same voltage input used for drop generation. We investigate how the drop size, generation frequency, and transport velocity depend on system parameters such as the liquid viscosity, interfacial tension, applied voltage, and channel dimensions. The observed trends are well explained by a series of scaling analyses that provide insight into the dominant physical mechanisms underlying drop generation and ratcheted transport. We identify the conditions necessary for achieving reliable operation and discuss the various modes of failure that can arise when these conditions are violated. Our results demonstrate that simple electric inputs can power increasingly complex droplet operations with potential opportunities for inexpensive and portable microfluidic systems.

  7. Classical-Equivalent Bayesian Portfolio Optimization for Electricity Generation Planning

    Directory of Open Access Journals (Sweden)

    Hellinton H. Takada

    2018-01-01

    Full Text Available There are several electricity generation technologies based on different sources such as wind, biomass, gas, coal, and so on. The consideration of the uncertainties associated with the future costs of such technologies is crucial for planning purposes. In the literature, the allocation of resources in the available technologies has been solved as a mean-variance optimization problem assuming knowledge of the expected values and the covariance matrix of the costs. However, in practice, they are not exactly known parameters. Consequently, the obtained optimal allocations from the mean-variance optimization are not robust to possible estimation errors of such parameters. Additionally, it is usual to have electricity generation technology specialists participating in the planning processes and, obviously, the consideration of useful prior information based on their previous experience is of utmost importance. The Bayesian models consider not only the uncertainty in the parameters, but also the prior information from the specialists. In this paper, we introduce the classical-equivalent Bayesian mean-variance optimization to solve the electricity generation planning problem using both improper and proper prior distributions for the parameters. In order to illustrate our approach, we present an application comparing the classical-equivalent Bayesian with the naive mean-variance optimal portfolios.

  8. Analysis of existing structure and emissions of wood combustion plants for the production of heat and electricity in Bavaria

    International Nuclear Information System (INIS)

    Joa, Bettina

    2014-01-01

    This work deals with the detailed analysis of the existing structure of all Bavarian wood burning plants for the generation of heat and electricity as well as the determination of the resulting emission emissions in 2013. The number of wood burning plants in the single-chamber fireplaces, wood central heating and wood-fired heating plants which are in operation in the year 2013 were determined, and how many plants are existing in the various areas like pellet stoves, traditional ovens, wood-burning fireplace, pellet central heating systems, wood chips central heating systems, fire-wood central heating systems, wood combined heat and power plant (electricity and heat) and wood power plants (heat). In addition, the regional distribution of the wood burning plants in the Bavarian governmental districts is investigated as well as the type and amount of energy produced by them (heat, electricity). [de

  9. The Relationship Between Electricity Price and Wind Power Generation in Danish Electricity Markets

    DEFF Research Database (Denmark)

    Hu, Weihao; Chen, Zhe; Bak-Jensen, Birgitte

    2010-01-01

    of competitive electricity markets in some ways, is chosen as the studied power system. The relationship between the electricity price (both the spot price and the regulation price) and the wind power generation in an electricity market is investigated in this paper. The spot price, the down regulation price...... and the up regulation price generally decreases when the wind power penetration in the power system increases. The statistical characteristics of the spot price for different wind power penetration are analyzed. The findings of this paper may be useful for wind power generation companies to make the optimal...... bidding strategy and may be also useful for the optimal operation of modern power systems with high wind power penetrations....

  10. Replacement of electrical protection of generation (main generator, main transformer and auxiliary transformers) and new associated monitoring system

    International Nuclear Information System (INIS)

    Archilla, J.

    2013-01-01

    The replacement of the electrical protection of generation is a technological quantum leap, since moving from an analog system (known by) (all, intuitive and visual) to a digital (integrates the hardware on a single computer, much more powerful and programmable). The keys to overcoming the challenge are know to manage the technological leap, the operational limitations of plant (keep operating the)preferred sources of energy) and make a good design (including a review independent of the configuration of the relays, taking into account the experience (operational available).

  11. Regional comparison of nuclear and fossil electric power generation costs

    International Nuclear Information System (INIS)

    Bowers, H.I.

    1984-01-01

    Nuclear's main disadvantages are its high capital investment cost and uncertainty in schedule compared with alternatives. Nuclear plant costs continue to rise whereas coal plant investment costs are staying relative steady. Based on average experience, nuclear capital investment costs are nearly double those of coal-fired generation plants. The capital investment cost disadvantage of nuclear is balanced by its fuel cost advantages. New base load nuclear power plants were projected to be competitive with coal-fired plants in most regions of the country. Nuclear power costs wre projected to be significantly less (10% or more) than coal-fired power costs in the South Atlantic region. Coal-fired plants were projected to have a significant economic advantage over nuclear plants in the Central and North Central regions. In the remaining seven regions, the levelized cost of power from either option was projected to be within 10%. Uncertainties in future costs of materials, services, and financing affect the relative economics of the nuclear and coal options significantly. 10 figures

  12. A comparative study of health hazards and environmental impacts for electricity generation through nuclear energy hidroelectricity and coal fired thermoeletrical generation

    International Nuclear Information System (INIS)

    Guimaraes, C.A.

    1982-01-01

    Environmental impacts and health hazards were comparatively assessed in regard to electricity generation via nuclear energy, hidraulic dams and coal firing. The main aspects covered the nuclear reactor and its associated nuclear fuel cycle, coal fired thermoelectrical power plant its associated coal industry, and hidroelectrical power plant and its dam. Besides specific comparisons of impacts in the air, water, soil and health hazards an evaluation for the Brazilian case was made based on a forecast of electricity demand up to the year 2020. For the nuclear option the consequences were analysed based on American data since no data is yet available for Brazil. Coal firing option was also analised for based heavily on American data due to small Brazilian experience in this sector of energy generation. For hydroelectrical option Brazilian data were used mostly from CESP for comparative purposes. These alternatives for generation of electricity considered in this study are the most relevant for the next four decades for Brazil. (Author) [pt

  13. The Spanish Nuclear Electricity Generating Capacity since 1982

    International Nuclear Information System (INIS)

    Garcia de Ubieta, A.

    2000-01-01

    The article describes the evolution of Spain's nuclear power plants since 1982, the year in which the journal of the Spanish Nuclear Society first appeared, underlining those events that have had a special impact on this evolution at national and international level. At present, there are 9 nuclear groups operating in the country, of the total 17 that were at different stages of their life cycle at that time. This reduction in the number of groups that finally managed to initiated and indefinitely continue their operating lifetime contrasts with the growth of electricity consumption over the period, which has practically doubled. During these 18 years have been profound transformations in the social, economic and political context of Spain, both in general and in the Electricity Industry in particular. Nevertheless, there are now reasons, old new, to feel confident as regards the future of this energy source. (Author)

  14. North Plant co-generation project for South Davis County Sewer Improvement District

    Energy Technology Data Exchange (ETDEWEB)

    Rogers, L.S. [Aqua Environmental Services, Inc., Bountiful, UT (United States)

    1993-12-31

    In the summer of 1988, the South Davis County Sewer Improvement District (SDCSID) learned of a grant/loan program being administered by the Utah State Department of Energy(DOE) for projects that demonstrate new and innovative ways of conserving energy or utilizing renewable energy sources. The SDCSID applied for and received from the DOE both a grant and a no-interest loan to finance half of the cost of a co-generation project at the North Wastewater Treatment Plant. This co-generation project utilizes methane gas, a by-product of the anaerobic digestion process, to generate both electricity and heat that is used at the plant. The SDCSID calculated that at the current anaerobic gas production rate, a 140 KW engine generator could be run almost 24 hours a day. Approximately 75% of the current electrical needs at the North Plant are supplied by the 140 KW engine generator. Also, all of the heat necessary to raise the temperature of the incoming sludge to 95{degrees}F, and to heat four large buildings is supplied from the heat recovery system of the engine. The system utilizes an induction type generator to supply electricity, which is somewhat simpler to design and less expensive to install than a synchronous type system. An induction system utilizes the Electrical Utility`s incoming power to excite the generator to correct the phase so that is can be used by the loads in the plant. In addition, the SDCSID installed a second identical engine generator as a back-up and to peak shave. Plant effluent is used to cool the engines instead of air-cooling through radiators.

  15. Developments in, and environmental impacts of, electricity generation from municipal solid waste and landfill gas combustion

    International Nuclear Information System (INIS)

    Porteous, A.

    1993-01-01

    The 1991 NFFO allocations for renewable energy generation are reviewed with emphasis on electricity from municipal solid waste (MSW) and landfill gas (LFG) combustion tranches. The implications of materials recovery on the calorific value of MSW are considered, as are the environmental impacts of both MSW and LFG combustion with special reference to air pollutant emissions. The performance and economics of state of the art incineration and LFG power generating plants are examined. It is shown that energy recovery from these wastes can be both cost effective and environmentally desirable. (Author)

  16. The effects of introducing natural gas in the Canary Islands for electricity generation

    International Nuclear Information System (INIS)

    Ramos-Real, Francisco Javier; Moreno-Piquero, Juan Carlos; Ramos-Henriquez, Jose Manuel

    2007-01-01

    This study analyses the economic effects of introducing natural gas in the Canary Islands to generate electricity in combined cycle gas turbine (CCGT) plants. To this end we will evaluate how this measure contributes to achieving the objectives of the islands' energy policy and we calculate the cost of generating a kWh from this technology. For this calculation we obtain the net present value (NPV) of the total production costs during the economic lifetime of the plant so as to subsequently find the unitary cost per kWh generated. The result obtained indicates that the kWh cost is some 25% lower than the cost of using petroleum derivatives. Additionally, if we consider the positive effect of CO 2 emissions reductions, the cost is 41% lower. The introduction of natural gas will also be a decisive factor in complying with Kyoto requirements and in diversifying supply sources in the Canaries

  17. Generation of short electrical pulses based on bipolar transistorsny

    Directory of Open Access Journals (Sweden)

    M. Gerding

    2004-01-01

    Full Text Available A system for the generation of short electrical pulses based on the minority carrier charge storage and the step recovery effect of bipolar transistors is presented. Electrical pulses of about 90 ps up to 800 ps duration are generated with a maximum amplitude of approximately 7V at 50Ω. The bipolar transistor is driven into saturation and the base-collector and base-emitter junctions become forward biased. The resulting fast switch-off edge of the transistor’s output signal is the basis for the pulse generation. The fast switching of the transistor occurs as a result of the minority carriers that have been injected and stored across the base-collector junction under forward bias conditions. If the saturated transistor is suddenly reverse biased the pn-junction will appear as a low impedance until the stored charge is depleted. Then the impedance will suddenly increase to its normal high value and the flow of current through the junction will turn to zero, abruptly. A differentiation of the output signal of the transistor results in two short pulses with opposite polarities. The differentiating circuit is implemented by a transmission line network, which mainly acts as a high pass filter. Both the transistor technology (pnp or npn and the phase of the transfer function of the differentating circuit influence the polarity of the output pulses. The pulse duration depends on the transistor parameters as well as on the transfer function of the pulse shaping network. This way of generating short electrical pulses is a new alternative for conventional comb generators based on steprecovery diodes (SRD. Due to the three-terminal structure of the transistor the isolation problem between the input and the output signal of the transistor network is drastically simplified. Furthermore the transistor is an active element in contrast to a SRD, so that its current gain can be used to minimize the power of the driving signal.

  18. BUILDOUT AND UPGRADE OF CENTRAL EMERGENCY GENERATOR SYSTEM, GENERATOR 3 AND 4 ELECTRICAL INSTALLATION

    Energy Technology Data Exchange (ETDEWEB)

    Gary D. Seifert; G. Shawn West; Kurt S. Myers; Jim Moncur

    2006-07-01

    SECTION 01000—SUMMARY OF WORK PART 1—GENERAL 1.1 SUMMARY The work to be performed under this project consists of providing the labor, equipment, and materials to perform "Buildout and Upgrade of Central Emergency Generator System, Generator 3 and 4 Electrical Installation" for the National Aeronautics and Space Administration at the Dryden Flight Research Center (NASA/DFRC), Edwards, California 93523. All modifications to existing substations and electrical distribution systems are the responsibility of the contractor. It is the contractor’s responsibility to supply a complete and functionally operational system. The work shall be performed in accordance with these specifications and the related drawings. The work of this project is defined by the plans and specifications contained and referenced herein. This work specifically includes but is not limited to the following: Scope of Work - Installation 1. Install all electrical wiring and controls for new generators 3 and 4 to match existing electrical installation for generators 1 and 2 and in accordance with drawings. Contractor shall provide as-built details for electrical installation. 2. Install battery charger systems for new generators 3 and 4 to match existing battery charging equipment and installation for generators 1 and 2. This may require exchange of some battery charger parts already on-hand. Supply power to new battery chargers from panel and breakers as shown on drawings. Utilize existing conduits already routed to generators 3 and 4 to field route the new wiring in the most reasonable way possible. 3. Install electrical wiring for fuel/lube systems for new generators 3 and 4 to match existing installation for generators 1 and 2. Supply power to lube oil heaters and fuel system (day tanks) from panel and breakers as shown on drawings. Utilize existing conduits already routed to generators 3 and 4 to field route the new wiring in the most reasonable way possible. Add any conduits necessary to

  19. Assessment of electrical equipment aging for nuclear power plant

    International Nuclear Information System (INIS)

    2013-01-01

    The electrical and instrumentation equipments, especially whose parts are made of polymer material, are gradually degraded by thermal and radiation environment in the normal operation, and the degradation is thought to progress rapidly when they are exposed to the environment of the design basis event (DBE). The integrity of the equipments is evaluated by the environmental qualification (EQ) test simulating the environment of the normal operation and the DBE. The project of 'Assessment of Cable Aging for Nuclear Power Plants' (ACA, 2002-2008) indicated the importance of applying simultaneous thermal and radiation aging for simulating the aging in normal operation. The project of 'Assessment of Electrical Equipment Aging for Nuclear Power Plants' (AEA) was initiated in FY2008 to apply the outcome of ACA to the other electrical and instrumentation equipment and to establish an advanced EQ test method that can appropriately simulate the environment in actual plants. In FY2012, aging characteristics of thermal aging and simultaneous aging were obtained for the epoxy resin of electrical penetrations and the O-ring of connectors. Physical property measurement was carried out for epoxy resin of electrical penetration subject to the type testing in FY2010. (author)

  20. A Summary Description of a Computer Program Concept for the Design and Simulation of Solar Pond Electric Power Generation Systems

    Science.gov (United States)

    1984-01-01

    A solar pond electric power generation subsystem, an electric power transformer and switch yard, a large solar pond, a water treatment plant, and numerous storage and evaporation ponds. Because a solar pond stores thermal energy over a long period of time, plant operation at any point in time is dependent upon past operation and future perceived generation plans. This time or past history factor introduces a new dimension in the design process. The design optimization of a plant must go beyond examination of operational state points and consider the seasonal variations in solar, solar pond energy storage, and desired plant annual duty-cycle profile. Models or design tools will be required to optimize a plant design. These models should be developed in order to include a proper but not excessive level of detail. The model should be targeted to a specific objective and not conceived as a do everything analysis tool, i.e., system design and not gradient-zone stability.

  1. Countries: General, Electricity, Geography, Health, Literature: Children's, Plants.

    Science.gov (United States)

    Web Feet, 2002

    2002-01-01

    Presents an annotated list of Web site educational resources kindergarten through eighth grade. The Web sites this month cover the following subjects: countries (general); electricity; geography; health; children's literature; and plants. Includes a list of "Calendar Connections" to Web site sources of information on Earth Day in April…

  2. Ashing vs. electric generation in accelerator driven system

    International Nuclear Information System (INIS)

    Solanilla, Roberto B.

    1999-01-01

    Accelerator Driven Systems have been conceived as an alternative for the processing of the radioactive wastes contained in spent fuel elements from nuclear power plants. These systems are formed by the coupling of a nuclear reactor - preferably a subcritical reactor - with a particle accelerator providing particles with energy in the order of the GeV. The long-lived fission products and actinides of the spent fuels are transformed by nuclear reactions in stable isotopes or in short-lived radioisotopes. The basic parameters for the electric energy production of the different systems are analysed. (author)

  3. Effect of excess air on second-generation PFB combustion plant performance and economics

    International Nuclear Information System (INIS)

    Robertson, A.; Garland, R.; Newby, R.; Rehmat, A.; Rubow, L.; Bonk, D.

    1990-01-01

    This paper presents a conceptual design of a 1.4-MPa (14-atm) coal-fired second-generation pressurized fluidized bed (PFB) combustion plant and identifies the performance and economic changes that result as the excess air and thus gas turbine-to-steam turbine power ratio, is changed. The performance of these plants, another second- generation PFB combustion plant, and a conventional pulverized-coal (PC)-fired plant with wet limestone flue gas desulfurization is compared. Depending upon the conditions selected, the PFB combustion plant can achieve a 45 percent efficiency (based on the higher heating value of the coal used as fuel) and a cost of electricity at least 20 percent lower than that of the conventional PC-fired plant

  4. Market power and technological bias in electricity generation markets

    International Nuclear Information System (INIS)

    Twomey, Paul; Neuhoff, Karsten

    2005-01-01

    It is difficult or very costly to avoid all market power in electricity markets. A recurring response is that a limited amount of market power is accepted with the justification that it is necessary to produce revenues to cover some of the fixed costs. It is assumed that all market participants benefit equally from the increased prices. However, this assumption is not satisfied if different production technologies are used. We assess the case of a generation mix of conventional generation and intermittent generation with exogenously varying production levels. If all output is sold in the spot market, then intermittent generation benefits less from market power than conventional generation. If forward contracts or option contracts are signed, then market power might be reduced but the bias against returns to intermittent generators persists. Thus allowing some level of market power as a means of encouraging investment in new generation may result in a bias against intermittent technologies or increase the costs of strategic deployment to achieve renewable quotas. (Author)

  5. Generation IV nuclear energy systems: road map and concepts. 2. Generation II Measurement Systems for Generation IV Nuclear Power Plants

    International Nuclear Information System (INIS)

    Miller, Don W.

    2001-01-01

    , humidity, smoke, and high temperature). Reference 4 describes the use of a Fabry-Perot fiber-optic temperature sensor that was selected for performance evaluation and for potential application in nuclear power plants because of its unique interferometric mechanism and data processing technique and its commercial availability. In the past several years, the use of acoustic methods, either transmission timing or correlation methods, have been developed to the point that they are being introduced as a back-fit in operating plants. The advantage these methods offer is increased accuracy, which translates into increased reactor power. A new method for local measurement of reactor power is being developed at Ohio State. This power sensor concept is based on maintaining a constant temperature in a small mass of actual reactor fuel or fuel analogue by adding heat through resistive dissipation of input electrical energy. Sensors of this type can provide a direct measurement of the nuclear energy deposition rather than neutron flux. Holcomb at Oak Ridge National Laboratory is proposing to develop a combined optical-based neutron flux/temperature sensor for in-core measurements in high-temperature gas reactors. The current status of I and C systems in nuclear power plants was reviewed, and it was concluded that the fundamental measuring systems had not changed substantially since the early nuclear plants. New methods and advanced measuring systems were discussed. Advanced systems of the type discussed should be considered in the design of next-generation I and C systems. However, they should be considered along with the sensors and systems currently being used, which have served their functions very well for the past 40 yr. (authors)

  6. Nuclear power as an option in electrical generation planning for Croatia

    International Nuclear Information System (INIS)

    Feretic, D.; Tomsic, Z.; Cavlina, N.; Kovacevic, T.

    2000-01-01

    The expected increase of electricity consumption in the next two decades, if covered mainly by domestic production, will require roughly 4500 MW of new installed capacity. The question is which resource mix would be optimal for the future power plants. Taking into account lack of domestic resources for electricity generation, current trends in the European energy markets, and environmental impact of various energy technologies, it seems reasonable for Croatia to keep the nuclear option open in the future energy planning. In line with that conclusion, this paper analyzes how the introduction of nuclear power plants would influence future power system expansion plans in Croatia, and the possibility to meet the Kyoto requirement. The effects of CO 2 emission tax and external costs on the optimal capacity mix and the emissions levels are also examined. (author)

  7. Status of the Monticello nuclear generating plant lead plant license renewal program

    International Nuclear Information System (INIS)

    Pickens, T.A.

    1992-01-01

    In 1988, the Monticello nuclear generating plant was chosen by the US Department of Energy through Sandia National Laboratories and the Electric Power Research Institute to serve as the lead boiling water reactor in the lead plant license renewal program. The purpose of the lead plant license renewal program is to provide insights during the development of and to demonstrate the license renewal regulatory process with the US Nuclear Regulatory Commission (NRC). The work being performed in three phases: (1) preparation of the technical basis for license renewal; (2) development of the technical basis into a formal license renewal application; and (3) review of the application by the NRC. This paper discusses the systems and structures identified as important to license renewal in accordance with 10CFR54 as well as the plant documents and programs that were used in going through the identification process. The systems and structures important to license renewal will then provide insights into how structures and components were identified that are required to be evaluated for aging, the elements of the aging evaluations, and the effective programs used to manage potentially significant aging

  8. The expected environmental consequences and hazards of laser-fusion electric generating stations

    International Nuclear Information System (INIS)

    Devaney, J.J.; Pendergrass, J.H.

    The operation of an expected early form of a laser-fusion electric power plant is described and the hazards and the environmental effects of such a station are estimated. Possible environmental impacts and hazards to mankind can occur from nuclear excursions or explosions, nuclear weapon proliferation, loss of coolant accident (LOCA), tritium releases, chemical fires and accompanying releases of radioactivity or chemicals, induced radioactivity releases (other than tritium), radioactive waste disposal, lasers, normal electrical generation and steam plant effects, external intrusions, natural disasters, land use, resource and transportation use, thermal pollution, and air and water pollution. We find the principle environmental effects to be those of a medium size chemical plant. Electric, magnetic, steam, and radioactive hazards are of a lower order. Indeed in the event of extraordinary success in getting high temperatures and densities so that more difficult nuclear species can be reacted, such as protons with boron-11, there will be no radioactivity at all and also enormously lower hazardous chemical inventories. In our plant designs, for any fusion fuels, nuclear explosions (or even excursions beyond design limits) are not possible. (author)

  9. Short-time action electric generators to power physical devices

    International Nuclear Information System (INIS)

    Glebov, I.A.; Kasharskij, Eh.G.; Rutberg, F.G.; Khutoretskij, G.M.

    1982-01-01

    Requirements to be met by power-supply sources of the native electrophysical facilities have been analyzed and trends in designing foreign electric machine units of short-time action have been considered. Specifications of a generator, manufactured in the form of synchronous bipolar turbogenerator with an all-forged rotor with indirect air cooling of the rotor and stator windings are presented. Front parts of the stator winding are additionally fixed using glass-textolite rings, brackets and gaskets. A flywheel, manufactured in the form of all-forged steel cylinder is joined directly with the generator rotor by means of a half-coupling. An acceleration asynchronous engine with a phase rotor of 4 MW nominal capacity is located on the opposite side of the flywheel. The generator peak power is 242 MVxA; power factor = 0.9; energy transferred to the load 5per 1 pulse =00 MJ; the flywheel weight 81 t

  10. Risk limitation, safety and environmental compatibility in electricity generation

    International Nuclear Information System (INIS)

    Angelini, A.M.

    1981-01-01

    The purpose of this paper is to present the problem of meeting future electricity needs while at the same time reducing to a minimum the risks, the pollution of air and water and the environmental effects of power stations. The first resource to exploit is the ''virtual source'' represented by energy saving pursued to the limit of the possible. The second, in order of priority, is that of renewable resources as yet unused and under development. Unfortunately, in most countries these latter resources are far from sufficient: it is then necessary to choose between the use of conventional fossil fuels and nuclear fuels. In this paper it is shown that, of all the possible fossil fuels, only coal can be considered for electricity production. As a result, in meeting new electricity needs, the choice will have to be made between coal and nuclear power. Attention is directed to factors having a significant influence on this choice, particularly the risks and safety problems in the widest sense, with a view to making a global evaluation comprising not just generating stations but the entire production cycle, from the search for the primary source to the supplying of electricity to the user. The most important problems that arise in this connection are briefly analysed in the paper, which concludes with an appeal for more objectivity in providing information on energy, such information being at present very ''polluted'' and exerting a major influence on the views of experts. (author)

  11. Electricity generation using continuously recirculated flow electrodes in reverse electrodialysis

    Science.gov (United States)

    Liu, Fei; Coronell, Orlando; Call, Douglas F.

    2017-07-01

    Capacitive flow electrode systems that generate electricity from salinity gradients are limited by low power densities, inefficient electrical current collection, and complex system operation. We show here the proof-of-concept that a single reverse electrodialysis cell using continuously recirculated activated carbon flow electrodes can generate uninterrupted electricity from an artificial sea/river water gradient. Power densities reached 61 ± 5.7 mW m-2 (normalized to total membrane surface area) and current densities 2.4 ± 0.13 A m-2 when a 10% by weight carbon loading was used with graphite plate current collectors. Using high-surface area graphite brush current collectors, maximum power densities increased more than 320% to 260 ± 8.7 mW m-2 and maximum current densities more than 400% to 14 ± 0.59 A m-2. The performance improvements were attributed to a more than 80% decrease in electrode resistances when brushes were used instead of plates. A control static capacitive electrode system obtained slightly higher average power densities (290 ± 8.7 mW m-2), but could not produce it continuously, highlighting the operational advantage of the recirculated flow electrode design.

  12. Coal-fired magnetohydrodynamic (MHD) electric power generation

    International Nuclear Information System (INIS)

    Sens, P.F.

    1992-01-01

    Since 1986 Directorate-General XII 'Science, Research and Development' of the Commission of the European Communities has kept a watching brief on the development of coal-fired magnetohydrodynamic (MHD) electric power generation from the 'solid fuels' section of its non-nuclear energy R and D programme. It established, in 1987, the Faraday Working Group (FWG) to assess the development status of coal-fired MHD and to evaluate its potential contribution to the future electricity production in the Community. The FWG expressed as its opinion, at the end of 1987, that in sufficient data were available to justify a final answer to the question about MHD's potential contribution to future electricity production and recommended that studies be undertaken in three areas; (i) the lifetime of the generator, (ii) cost and performance of direct air preheating, (iii) cost and efficiency of seed recovery/reprocessing. These studies were contracted and results were presented in the extended FWG meeting on 15 November 1990, for an audience of about 70 people. The present volume contains the proceedings of this meeting. The introduction describes the reasons for establishing the FWG, its activities and the content of its extended meeting followed by the summary of the discussions and the concluding remarks of this meeting. The main part of the volume consists of the text either of the oral presentations during the meeting or of the final reports resulting from the studies under contract

  13. Next Generation Nuclear Plant Materials Research and Development Program Plan

    International Nuclear Information System (INIS)

    G.O. Hayner; R.L. Bratton; R.N. Wright

    2005-01-01

    The U.S Department of Energy (DOE) has selected the Very High Temperature Reactor (VHTR) design for the Next Generation Nuclear Plant (NGNP) Project. The NGNP will demonstrate the use of nuclear power for electricity and hydrogen production without greenhouse gas emissions. The reactor design will be a graphite moderated, helium-cooled, prismatic or pebble-bed, thermal neutron spectrum reactor that will produce electricity and hydrogen in a state-of-the-art thermodynamically efficient manner. The NGNP will use very high burn-up, low-enriched uranium, TRISO-coated fuel and have a projected plant design service life of 60 years. The VHTR concept is considered to be the nearest-term reactor design that has the capability to efficiently produce hydrogen. The plant size, reactor thermal power, and core configuration will ensure passive decay heat removal without fuel damage or radioactive material releases during accidents. The NGNP Project is envisioned to demonstrate the following: (1) A full-scale prototype VHTR by about 2021; (2) High-temperature Brayton Cycle electric power production at full scale with a focus on economic performance; (3) Nuclear-assisted production of hydrogen (with about 10% of the heat) with a focus on economic performance; and (4) By test, the exceptional safety capabilities of the advanced gas-cooled reactors. Further, the NGNP program will: (1) Obtain a Nuclear Regulatory Commission (NRC) License to construct and operate the NGNP, this process will provide a basis for future performance based, risk-informed licensing; and (2) Support the development, testing, and prototyping of hydrogen infrastructures. The NGNP Materials Research and Development (R and D) Program is responsible for performing R and D on likely NGNP materials in support of the NGNP design, licensing, and construction activities. The NGNP Materials R and D Program includes the following elements: (1) Developing a specific approach, program plan and other project management

  14. Next Generation Nuclear Plant Materials Research and Development Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    G.O. Hayner; R.L. Bratton; R.N. Wright

    2005-09-01

    The U.S Department of Energy (DOE) has selected the Very High Temperature Reactor (VHTR) design for the Next Generation Nuclear Plant (NGNP) Project. The NGNP will demonstrate the use of nuclear power for electricity and hydrogen production without greenhouse gas emissions. The reactor design will be a graphite moderated, helium-cooled, prismatic or pebble-bed, thermal neutron spectrum reactor that will produce electricity and hydrogen in a state-of-the-art thermodynamically efficient manner. The NGNP will use very high burn-up, low-enriched uranium, TRISO-coated fuel and have a projected plant design service life of 60 years. The VHTR concept is considered to be the nearest-term reactor design that has the capability to efficiently produce hydrogen. The plant size, reactor thermal power, and core configuration will ensure passive decay heat removal without fuel damage or radioactive material releases during accidents. The NGNP Project is envisioned to demonstrate the following: (1) A full-scale prototype VHTR by about 2021; (2) High-temperature Brayton Cycle electric power production at full scale with a focus on economic performance; (3) Nuclear-assisted production of hydrogen (with about 10% of the heat) with a focus on economic performance; and (4) By test, the exceptional safety capabilities of the advanced gas-cooled reactors. Further, the NGNP program will: (1) Obtain a Nuclear Regulatory Commission (NRC) License to construct and operate the NGNP, this process will provide a basis for future performance based, risk-informed licensing; and (2) Support the development, testing, and prototyping of hydrogen infrastructures. The NGNP Materials Research and Development (R&D) Program is responsible for performing R&D on likely NGNP materials in support of the NGNP design, licensing, and construction activities. The NGNP Materials R&D Program includes the following elements: (1) Developing a specific approach, program plan and other project management tools for

  15. Second generation plant health clinics in Uganda

    DEFF Research Database (Denmark)

    Danielsen, Solveig; Matsiko, Frank; Mutebi, Emmanuel

    to measure performance and health outcomes. The modified plant health system model was based on six system components: Service delivery, Plant health workforce, Plant health information, Input supply, Finance, and Policy, governance and leadership. As plant clinic performance indicators we used Clinic....... Ownership was strengthened and clinic management improved with stronger local leadership. It was nonetheless evident that the clinic initiative expanded in a loose and unregulated way. It was not always clear who was leading the activities and providing the overall championship to guarantee that basic...... standards and procedures were in place and followed up on. Many of the observed clinic weaknesses were products of missing coordination, follow up and communication. The sustainability of plant clinics is still uncertain. Funds are limited and skilled human resources to man the clinics have yet to reach...

  16. Nuclear Power for Future Electricity Generation in Ghana: Issues and Challenges

    International Nuclear Information System (INIS)

    Nyarko, B.J.B.; Akaho, E.H.K.; Ennison, I.

    2011-01-01

    Ghana's electricity demand has been estimated to be growing at a high rate of about 7% per annum over the last ten years. This is due to the relatively high population growth, economic aspiration of the country and the extension of electricity to rural areas. Electricity supply, on the contrary, has been unable to meet the demand due to high dependency on rain-fed hydropower plants, which started operating in 1965 and currently account for about 68% of the total installed capacity. Within the last 28 years, climatic changes and draughts have caused the nation to experience three major power crises. These climate changes resulted in low inflows and thus reduced power generation from hydropower systems. To complement the hydropower systems, the Government in 1997 installed thermal plants based on light crude oil. However, due to the high crude oil prices on the international market in recent times have made the operation of these plants very expensive. Ghana's crude oil find can boost its energy supply when the oil exploration begins somewhere in 2010. For rural cooking, domestic biomass is employed. Ghana has no domestic coal resources. The Government of Ghana is concerned with: limited further growth potential of domestic hydro; high cost of imported oil and gas and environmental issues associated with use of imported coal. Small Solar and wind generation exist in some sectors, but potential large-scale development is not envisioned for the near future. With these in mind, the President of Ghana set up a Committee involving Stakeholder Institutions to formulate the Nuclear Power Policy and develop the basic elements of Nuclear Infrastructure and to assess the viability of introducing the nuclear power option in Ghana's energy mix. Cabinet took a decision to include the nuclear power for electricity generation after the Committee submitted his report to the President in 2008. (author)

  17. Nuclear Power and Environment Comparative Assessment of Environmental and Health Impacts of Electricity Generating Systems

    International Nuclear Information System (INIS)

    Rashed, S.M.

    1999-01-01

    This paper deals with comparative assessment of the environmental and health impacts of nuclear and other electricity generation systems. The study including normal operations and accidents in full energy chain analysis. The comparison of the environmental impacts arising from the waste management cycles associated with non emission waste are also discussed. Nuclear Power while economically feasible and meeting 17% of the world,s demand for electricity is almost free of the air polluting gases that threaten the global climate. Comparing nuclear power with other sources for electricity generation in terms of their associated environmental releases of pollutant such as SO 2 , NOX, CO 2 , CH 4 and radioisotopes, taking into account the full fuel chains chains of supply option, nuclear power will help to reduce environmental degradation due to electricity generation activities. In view of CO 2 emission, the ranking order commences with hydro, followed by nuclear, wind and photovoltaic Power Plants. CO 2 emissions from a nuclear power plant are by two orders of magnitude lower than those of fossil fueled power plants. A consequent risk comparison between different energy sources has to include al phases of the whole energy cycle. Coal mines accidents have resulted in several 1000 acute deaths over the years. Later fatalities have never been estimated. Then came hydropower, also resulting in many catastrophes and losses of human lives. Followed oil and gas energy industry, its tribute in acute fatalities is expressed in more than 1000 life lost. No estimate is available concerning later fatalities. latest in the list is commercial nuclear energy, badly illustrated by the Chernobyl accident resulting officially in 31 acute fatalities, 145 latent fatalities, and 135000 evacuated individuals. The paper offers some findings and conclusions on the role of nuclear power in protecting the global environment

  18. Present situation and future prospects of electricity generation in Aegean Archipelago islands

    International Nuclear Information System (INIS)

    Kaldellis, J.K.; Zafirakis, D.

    2007-01-01

    The Aegean Archipelago is a remote Hellenic area, including several hundreds of scattered islands of various sizes. In these islands more than 600,000 people are living mainly in small remote communities. The main economical activities of the islanders are apart from tourism, seafaring, fishery, agriculture and stock farming. One of the major problems of the area is the insufficient infrastructure, strongly related with the absence of an integrated and cost-effective electrification plan. In this context, the present work is concentrated on analyzing the present situation and demonstrating the future prospects of electricity generation in the Aegean Archipelago islands. For this purpose, one should first investigate the time evolution of the corresponding electricity generation parameters (i.e. annual electricity consumption, peak power demand, capacity factor, specific fuel consumption) for the last 30 years. Subsequently, the corresponding diesel and heavy-oil consumption along with the electricity production cost for every specific autonomous power station of the area are investigated. Special attention is paid in order to estimate the contribution of renewable energy sources (RES) in the energy balance of each island. Finally, an attempt is made to describe in brief the most realistic electricity production solutions available, including the operation of hybrid RES-based power plants in collaboration with appropriate energy storage facilities. Additionally, the idea of connecting the islands of the area with the mainland and interconnecting them is also taken into consideration

  19. Performance of Generating Plant: Managing the Changes. Part 3: Renewable energy plant: reports on wind, photovoltaics and biomas energies

    Energy Technology Data Exchange (ETDEWEB)

    Manoha, Bruno; Cohen, Martin [Electricite de France (France)

    2008-05-15

    The WEC Committee on the Performance of Generating Plant (PGP) has been collecting and analysing power plant performance statistics worldwide for more than 30 years and has produced regular reports, which include examples of advanced techniques and methods for improving power plant performance through benchmarking. A series of reports from the various working groups was issued in 2008. This reference presents the results of Working Group 3 (WG3). WG3 will promote the introduction of performance indicators for renewable energy generating plant (wind, geothermal, solar and biomass) developed by the Committee. It will also assess selected transitional technology issues and environmental factors related to non-conventional technologies. The WG3 report includes sections on Wind Energy Today, Photovoltaics Energy Today, Biomass Electricity Today and appendices.

  20. Generation adequacy and transmission interconnection in regional electricity markets

    International Nuclear Information System (INIS)

    Cepeda, Mauricio; Saguan, Marcelo; Finon, Dominique; Pignon, Virginie

    2009-01-01

    The power system capacity adequacy has public good features that cannot be entirely solved by electricity markets. Regulatory intervention is then necessary and established methods have been used to assess adequacy and help regulators to fix this market failure. In regional electricity markets, transmission interconnections play an important role in contributing to adequacy. However, the adequacy problem and related policy are typically considered at a national level. This paper presents a simple model to study how the interconnection capacity interacts with generation adequacy. First results indicate that increasing interconnection capacity between systems improves adequacy up to a certain level; further increases do not procure additional adequacy improvements. Furthermore, besides adequacy improvement, increasing transmission capacity under asymmetric adequacy criteria or national system characteristics could create several concerns about externalities. These results imply that regional coordination of national adequacy policies is essential to internalise adequacy of cross-border effects.