WorldWideScience

Sample records for electric company geysers

  1. Periodic changes in effluent chemistry at cold-water geyser: Crystal geyser in Utah

    Science.gov (United States)

    Han, Weon Shik; Watson, Z. T.; Kampman, Niko; Grundl, Tim; Graham, Jack P.; Keating, Elizabeth H.

    2017-07-01

    Crystal geyser is a CO2-driven cold-water geyser which was originally drilled in the late 1930's in Green River, Utah. Utilizing a suite of temporal groundwater sample datasets, in situ monitoring of temperature, pressure, pH and electrical conductivity from multiple field trips to Crystal geyser from 2007 to 2014, periodic trends in groundwater chemistry from the geyser effluent were identified. Based on chemical characteristics, the primary sourcing aquifers are characterized to be both the Entrada and Navajo Sandstones with a minor contribution from Paradox Formation brine. The single eruption cycle at Crystal geyser lasted over four days and was composed of four parts: Minor Eruption (mEP), Major Eruption (MEP), Aftershock Eruption (Ae) and Recharge (R). During the single eruption cycle, dissolved ionic species vary 0-44% even though the degree of changes for individual ions are different. Generally, Na+, K+, Cl- and SO42- regularly decrease at the onset and throughout the MEP. These species then increase in concentration during the mEP. Conversely, Ca2+, Mg2+, Fe2+ and Sr2+ increase and decrease in concentration during the MEP and mEP, respectively. The geochemical inverse modeling with PHREEQC was conducted to characterize the contribution from three end-members (Entrada Sandstone, Navajo Sandstone and Paradox Formation brine) to the resulting Crystal geyser effluent. Results of the inverse modeling showed that, during the mEP, the Navajo, Entrada and brine supplied 62-65%, 36-33% and 1-2%, respectively. During the MEP, the contribution shifted to 53-56%, 45-42% and 1-2% for the Navajo, Entrada and Paradox Formation brine, respectively. The changes in effluent characteristics further support the hypothesis by Watson et al. (2014) that the mEP and MEP are driven by different sources and mechanisms.

  2. Impact of water hardness on energy consumption of geyser heating ...

    African Journals Online (AJOL)

    Therefore, the Eskom Research, Testing, and Development Business Unit embarked on a study to examine total water hardness as a chemical parameter that may impact the power consumption of electrical geyser heating elements. An accelerated scaling method was developed to lime-scale the geyser heating elements ...

  3. Geysering in boiling channels

    Energy Technology Data Exchange (ETDEWEB)

    Aritomi, Masanori; Takemoto, Takatoshi [Tokyo Institute of Technology, Tokyo (Japan); Chiang, Jing-Hsien [Japan NUS Corp. Ltd., Toyko (Japan)] [and others

    1995-09-01

    A concept of natural circulation BWRs such as the SBWR has been proposed and seems to be promising in that the primary cooling system can be simplified. The authors have been investigating thermo-hydraulic instabilities which may appear during the start-up in natural circulation BWRs. In our previous works, geysering was investigated in parallel boiling channels for both natural and forced circulations, and its driving mechanism and the effect of system pressure on geysering occurrence were made clear. In this paper, geysering is investigated in a vertical column and a U-shaped vertical column heated in the lower parts. It is clarified from the results that the occurrence mechanism of geysering and the dependence of system pressure on geysering occurrence coincide between parallel boiling channels in circulation systems and vertical columns in non-circulation systems.

  4. The Geysers Geothermal Field Update1990/2010

    Energy Technology Data Exchange (ETDEWEB)

    Brophy, P.; Lippmann, M.; Dobson, P.F.; Poux, B.

    2010-10-01

    view across all technical fields, as related to The Geysers steam-dominated geothermal system. The Geysers has seen many fundamental changes between 1990-2010 and yet the geothermal resource seems still to be robust to the extent that, long after its anticipated life span, we are seeing new geothermal projects being developed on the north and west peripheries of the field. It is hoped that this report provides a focused data source particularly for those just starting their geothermal careers, as well as those who have been involved in the interesting and challenging field of geothermal energy for many years. Despite many hurdles The Geysers has continued to generate electrical power for 50 years and its sustainability has exceeded many early researchers expectations. It also seems probable that, with the new projects described above, generation will continue for many years to come. The success of The Geysers is due to the technical skills and the financial acumen of many people, not only over the period covered by this report (1990-2010), but since the first kilowatt of power was generated in 1960. This Special Report celebrates those 50 years of geothermal development at The Geysers and attempts to document the activities that have brought success to the project so that a permanent record can be maintained. It is strongly hoped and believed that a publication similar to this one will be necessary in another 20 years to document further activities in the field.

  5. Geysers advanced direct contact condenser research

    Energy Technology Data Exchange (ETDEWEB)

    Henderson, J.; Bahning, T.; Bharathan, D.

    1997-12-31

    The first geothermal application of the Advanced Direct Contact Condenser (ADCC) technology developed by the National Renewable Energy Laboratory (NREL) is now operational and is being tested at The Geysers Power Plant Unit 11. This major research effort is being supported through the combined efforts of NREL, The Department of Energy (DOE), and Pacific Gas and Electric (PG&E). NREL and PG&E have entered into a Cooperative Research And Development Agreement (CRADA) for a project to improve the direct-contact condenser performance at The Geysers Power Plant. This project is the first geothermal adaptation of an advanced condenser design developed for the Ocean Thermal Energy Conversion (OTEC) systems. PG&E expects this technology to improve power plant performance and to help extend the life of the steam field by using steam more efficiently. In accordance with the CRADA, no money is transferred between the contracting parties. In this case the Department of Energy is funding NREL for their efforts in this project and PG&E is contributing funds in kind. Successful application of this technology at The Geysers will provide a basis for NREL to continue to develop this technology for other geothermal and fossil power plant systems.

  6. Electric Holding Company Areas

    Data.gov (United States)

    Department of Homeland Security — Holding companies are electric power utilities that have a holding company structure. This vector polygon layer represents the area served by electric power holding...

  7. A Multi-Method Experiment to Investigate Geyser Dynamics: Lone Star Geyser, Yellowstone National Park

    Science.gov (United States)

    Hurwitz, S.; Vandemeulebrouck, J.; Johnston, M. J.; Sohn, R. A.; Karlstrom, L.; Rudolph, M. L.; Murphy, F.; McPhee, D. K.; Glen, J. M.; Soule, S. A.; Pontbriand, C.; Meertens, C. M.

    2011-12-01

    Geysers are intermittently discharging hot springs that are driven by steam and non-condensable gas. They provide unique opportunities to study multiphase eruption processes and the geophysical signals they induce. In September 2010 we carried out a four-day experiment at Lone Star Geyser in Yellowstone National Park. The geyser is located about 5 km SSE of Old Faithful Geyser and 75 m north of the Upper Firehole River. Lone Star is a cone geyser that was selected for the experiment because it is isolated from other geysers, its eruptions are vigorous and voluminous, and its eruption intervals are relatively constant and predictable, occurring approximately every 3 hours. We made measurements during 32 eruption cycles using a suite of instruments including a broadband seismometer, 2 microphones, 5 platform tiltmeters, 3 collimating InfraRed sensors, 2 gravimeters, 2 self-potential sensors, 2 Light Detection And Ranging (LiDAR) scanners, a Forward Looking InfraRed (FLIR) camera, high-speed video cameras, and stream gauging. We also integrated meteorological data from nearby weather stations. The large dataset acquired during the experiment allows for the detection of a myriad of processes in the subsurface and in the erupting column at many different frequencies. The analyzed data yield new insights on multiphase eruptive processes that have implications for understanding self-organized, intermittent processes in nature that result from phase separation and localized input of energy and mass. The geophysical signals recorded during the experiment allow comparison with signals recorded in more complex volcanic systems where gas-driven and magma-driven processes are often hard to distinguish.

  8. Mechanics of Old Faithful Geyser, Calistoga, CA

    Science.gov (United States)

    Rudolph, M.L.; Manga, M.; Hurwitz, Shaul; Johnston, Malcolm J.; Karlstrom, L.; Wang, Chun-Yong

    2012-01-01

    In order to probe the subsurface dynamics associated with geyser eruptions, we measured ground deformation at Old Faithful Geyser of Calistoga, CA. We present a physical model in which recharge during the period preceding an eruption is driven by pressure differences relative to the aquifer supplying the geyser. The model predicts that pressure and ground deformation are characterized by an exponential function of time, consistent with our observations. The geyser's conduit is connected to a reservoir at a depth of at least 42 m, and pressure changes in the reservoir can produce the observed ground deformations through either a poroelastic or elastic mechanical model.

  9. Preservation of the Rotorua geysers

    International Nuclear Information System (INIS)

    Allia, R.G.; Lumb, T.

    1990-01-01

    This paper reports on the preservation of the Rotorua Geysers the geothermal activity at Rotorua, New Zealand, which has always been noted for its special cultural, tourist, and scientific values. A gradual increase in the drawoff of geothermal fluid through wells since the 1950s raised national concerns in the early 1980s when spring and geyser activity significantly declined. A government-funded monitoring program began in 1982 to establish the rate and cause of the decline in activity, as well as the magnitude of the drawoff. No new wells were permitted within 1.5 km of the geyser area. By late 1985, the monitoring program confirmed that drawdown of the geothermal field was linked to the drawoff by geothermal wells. It recommended that the drawoff could be reduced by 75% by well sharing and efficiency increases. The link between well discharges and the activity of thermal decline was disputed by the Rotorua Geothermal Users Association. By late 1986, the continuing decline in field pressure was considered to be serious, so the Government recommended compulsory closure of wells within 1.5 km of the geysers, and imposed a charging policy for geothermal usage elsewhere in Rotorua. The closures were battled in the High Court, and subsequently there was also considerable local resistance and publicity to the forced entry onto private land by authorities trying to cement up wells. The combination of enforced well closures, and what was considered by some to be punitive charges for geothermal usage, resulted in an 80% reduction in geothermal well discharges by late 1989. Some of hot spring activity has returned, and geyser activity is more intense. Recently, some residents have been concerned that cooled former thermal areas near houses may be heating up again, and that the well closures have also caused a dangerous build up in gas pressure near surface. This claim is presently being investigated

  10. Final cost reduction study for the Geysers Recharge Alternative. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-11-01

    The purpose of this study is to determine whether or not cost reduction opportunities exist for the Geysers Recharge Alternative as defined in the Santa Rosa Subregional Long-Term Wastewater Project EIR/EIS. The City of Santa Rosa has been directed to have a plan for reclaimed water disposal in place by 1999 which will meet future capacity needs under all weather conditions. A Draft EIR/EIS released in July 1996 and a Final EIR certified in June 1997 examine four primary alternatives plus the No Action Alternative. Two of the primary alternatives involve agricultural irrigation with reclaimed water, either in western or southern Sonoma County. Another involves increased discharge of reclaimed water into the Russian River. The fourth involves using reclaimed water to replenish the geothermal reservoir at the Geysers. The addition of this water source would enable the Geysers operators to produce more steam from the geothermal area and thereby prolong the life and economic production level of the steamfield and the geothermal power plants supplied by the steamfield. This study provides additional refined cost estimates for new scenarios which utilize an alternative pipeline alignment and a range of reclaimed water flows, which deliver less water to the Geysers than proposed in the EIR/EIS (by distributing flow to other project components). Also, electrical power rates were revised to reflect the recent changes in costs associated with deregulation of the power industry. In addition, this report provides information on sources of potential public and private funding available and future environmental documentation required if the cost reduction scenarios were to be selected by the City as part of their preferred alternative.

  11. 76 FR 24465 - Pacific Gas and Electric Company

    Science.gov (United States)

    2011-05-02

    ... Electric Company Notice of Application Tendered for Filing With the Commission and Establishing Procedural... Gas and Electric Company. e. Name of Project: Drum-Spaulding Project. f. Location: The west slope of..., Pacific Gas and Electric Company, P.O. Box 770000, San Francisco, CA 94177-0001, (415) 973-4481, or e-mail...

  12. Life cycle of a geyser discharge apron: Evidence from Waikite Geyser, Whakarewarewa geothermal area, North Island, New Zealand

    Science.gov (United States)

    Jones, Brian; Renaut, Robin W.; Owen, R. Bernhart

    2011-05-01

    Waikite, a geyser located in the Whakarewarewa geothermal area on the North Island, New Zealand, has a history of eruptive-dormancy cycles that have been attributed to natural and anthropogenic causes. The last cycle involved an active period from ~ 1932 to 1968/69 that was followed by a period of dormancy that continues today. Such cycles are important because they control the temporal development of the discharge apron. When the geyser is active, growth of the discharge apron is dictated by the precipitation of opal-A, which is controlled by factors such as discharge patterns, water chemistry, pH, temperature, rate of cooling, and the resident microbiota. With dormancy, conditions change radically because water no longer flows down the discharge apron. Instead, the discharge apron lapses into a phase of degradation that, on Waikite, is evident from (1) deflation of the apron surface, (2) blocks splaying off the apron margins along margin-parallel fractures, (3) tension fractures, (4) saucer-shaped collapse zones, (5) increasingly unstable surfaces resulting from subsurface opal-A dissolution, (6) fractures, from which steam and other gases emanate, and (7) incursion of native vegetation around the edge of the apron and on the distal parts of the discharge apron. When the geyser becomes active again, silica precipitation will resume and the discharge apron will once again accrete vertically and expand laterally. Analysis of the Waikite system shows that successions that develop on geyser discharge aprons are formed of unconformity-bounded packages of sinter that reflect the eruptive-dormancy history of the parent geyser.

  13. "Tepid" Geysers above salt caverns

    Science.gov (United States)

    Bérest, Pierre; Brouard, Benoît; Zakharov, Vassily

    2018-06-01

    The formation of a brine geyser erupting from the wellhead of a large underground salt cavern is described. In most cases, the brine outflow from an opened cavern is slow; it results from the cavern creep closure and the thermal expansion of the cavern brine. These two processes are smooth; however, the brine outflow often is bumpy, as it is modulated by atmospheric pressure variations that generate an elastic increase (or decrease) of both cavern and brine volumes. In addition, when the flow is fast enough, the brine thermodynamic behavior in the wellbore is adiabatic. The cold brine expelled from the cavern wellhead is substituted with warm brine entering the borehole bottom, resulting in a lighter brine column. The brine outflow increases. In some cases, the flow becomes so fast that inertia terms must be taken into account. A geyser forms, coming to an end when the pressure in the cavern has dropped sufficiently. A better picture is obtained when head losses are considered. A closed-form solution can be reached. This proves that two cases must be distinguished, depending on whether the cold brine initially contained in the wellbore is expelled fully or not. It can also be shown that geyser formation is a rare event, as it requires both that the wellbore be narrow and that the cavern be very compressible. This study stemmed from an actual example in which a geyser was observed. However, scarce information is available, making any definite interpretation difficult. xml:lang="fr"

  14. The floating desalination complex GEYSER-1

    International Nuclear Information System (INIS)

    Vorobyov, V.M.

    1997-01-01

    A conventional floating desalination complex, GEYSER-1, is presented which is capable of producing 40,000 cubic meters per day (m 3 /d) of fresh water from brackish water or seawater. The complex includes a water intake system, a preliminary water preparation system, a high-pressure pump house and a power installation based on diesel or a gas turbines with service equipment. GEYSER-1 can be transported to the place of operation either by a heavy lift ship or by towing. (author)

  15. Back-Projection Imaging of extended, high-frequency pre-, co-, and post-eruptive seismicity at El Jefe Geyser, El Tatio Geyser Field, Chile

    Science.gov (United States)

    Kelly, C. L.; Lawrence, J. F.; Beroza, G. C.

    2017-12-01

    El Tatio Geyser Field in northern Chile is the third largest geyser field in the world. It is comprised of 3 basins that span 10 km x 10 km at an average elevation of 4250 m and contains at least 80 active geysers. Heavy tourist traffic and previous geothermal exploration make the field relatively non-pristine and ideal for performing minimally invasive geophysical experiments. We deployed a dense array of 51 L-28 3-component geophones (1-10 m spacing, corner frequency 4.5 Hz, 1000 Hz sample rate), and 6 Trillium 120 broadband seismometers (2-20 m spacing, long period corner 120 s, 500 Hz sample rate) in a 50 m x 50 m grid in the central Upper Geyser Basin (the largest basin in area at 5 km x 5 km) during October 2012 as part of a collaborative study of hydrothermal systems between Stanford University; U.C. Berkeley; U. of Chile, Santiago; U. of Tokyo; and the USGS. The seismic array was designed to target at El Jefe Geyser (EJG), a columnar geyser (eruption height 1-1.5 m) with a consistent periodic eruption cycle of 132 +/- 3 s. Seismicity at EJG was recorded continuously for 9 days during which 6000 total eruptions occurred. Excluding periods of high anthropogenic noise (i.e. tourist visits, field work), the array recorded 2000 eruptions that we use to create 4D time-lapse images of the evolution of seismic source locations before, during and after EJG eruptions. We use a new back-projection processing technique to locate geyser signals, which tend to be harmonic and diffuse in nature, during characteristic phases of the EJG eruption cycle. We obtain Vp and Vs from ambient-field tomography and estimates of P and S propagation from a hammer source recorded by the array. We use these velocities to back-project and correlate seismic signals from all available receiver-pairs to all potential source locations in a subsurface model assuming straight-line raypaths. We analyze results for individual and concurrent geyser sources throughout an entire EJG eruption cycle

  16. Electricity Self-Generation Costs for Industrial Companies in Cameroon

    Directory of Open Access Journals (Sweden)

    Diboma Benjamin Salomon

    2010-07-01

    Full Text Available Industrial production in developing countries (DC is frequently perturbed by electric energy supply difficulties. To overcome this problem, generators are used in self-generation of energy, but this leads to an increase of electricity-related expenses. This article assesses the impact of electricity self-generation on Cameroonian industrial companies. The model described in this article is based on data collected through a survey of a representative sample of industrial companies and from numerous previous thematic and statistical studies. The results of our analyses show that expenses related to electricity in industrial companies in Cameroon have increased five times due to electricity rationing and untimely power cuts. The article also suggests some solutions to improve the electricity self-generation capacity of industrial companies.

  17. Industrial companies' demand for electricity. Evidence from a micropanel

    International Nuclear Information System (INIS)

    Bjoerner, T.B.; Togeby, M.; Jensen, H.H.

    2001-01-01

    The paper presents a micro-econometric analysis of industrial companies' demand for electricity. Previous studies on electricity consumption in the industrial sector have relied on aggregate data or cross-section observations. Here we present an econometric study on electricity demand based on a panel of 2949 Danish companies followed from 1983 to 1996. It is found that estimators of electricity demand that take account of the panel structure (fixed effect models) yield considerably lower price and production elasticities compared to estimators that do not (like cross-section models). It is also investigated how various company characteristics like size, type of industrial sub-sector and electricity intensity in production influence price and production elasticities. It appears that companies with a high electricity intensity also have a high own-price elasticity

  18. Experience of electric power conservation in COELBA (Bahia Electric Company)

    International Nuclear Information System (INIS)

    Bastos, A.C.F.

    1990-01-01

    The electric power crisis of Brazilian north-east in 1987 imposes the Bahia Electric Company-COELBA to management a electric power conservation. The institutional, organizational and operational aspects are presented, including the tariff system, the market, the consumption and the relation with public. (author)

  19. 78 FR 72877 - Arkansas Electric Corporation v. Oklahoma Gas and Electric Company; Notice of Complaint

    Science.gov (United States)

    2013-12-04

    ... Electric Corporation v. Oklahoma Gas and Electric Company; Notice of Complaint Take notice that on November... Commission (Commission), 18 CFR 385.206, Arkansas Electric Corporation (Complainant) filed a formal complaint against Oklahoma Gas and Electric Company (Respondents), alleging that the Respondent's Production Formula...

  20. Research on service strategy of electricity selling company under the reform of electricity market

    Science.gov (United States)

    Long, Zhuhan; Meng, Shiyu; Dou, Jinyue; Zeng, Ming; Sun, Chenjun

    2017-10-01

    The opening of the sale side of electricity market is an important goal of the new round of power system reform in China, and it is necessary to speed up the establishment and development of the electricity selling companies to achieve this goal. First of all, this paper defines the key problems, which are needed to be solved in the establishment of the sale side market, such as demand side response, optimization of users' power consumption mode, profit mode of electricity selling companies and fair competition in the market. On this basis, this paper analyzes the business of electricity selling company, from the aspects of the transition of business ideas, improving the energy efficiency level, providing integrated energy solutions and innovating business management mode; and then, the service strategies of electricity selling companies are put forward.

  1. 78 FR 72552 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2013-12-03

    ... Airworthiness Directives; General Electric Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA... General Electric Company model GEnx-2B67 and GEnx-2B67B turbofan engines. This AD was prompted by the... certain serial number General Electric Company (GE) model GEnx-2B67 and GEnx-2B67B turbofan engines. The...

  2. 78 FR 56594 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2013-09-13

    ... Airworthiness Directives; General Electric Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA... General Electric Company (GE) GE90-76B, -85B, -90B, -94B, -110B1, and - 115B turbofan engines. This AD was...) Applicability This AD applies to General Electric Company (GE): (1) GE90-76B, -85B, -90B, and -94B turbofan...

  3. Subsurface energy storage and transport for solar-powered geysers on Triton

    Science.gov (United States)

    Kirk, Randolph L.; Soderblom, Laurence A.; Brown, Robert H.

    1990-01-01

    The location of active geyser-like eruptions and related features close to the current subsolar latitude on Triton suggests a solar energy source for these phenomena. Solid-state greenhouse calculations have shown that sunlight can generate substantially elevated subsurface temperatures. A variety of models for the storage of solar energy in a subgreenhouse layer and for the supply of gas and energy to a geyser are examined. 'Leaky greenhouse' models with only vertical gas transport are inconsistent with the observed upper limit on geyser radius of about 1.5 km. However, lateral transport of energy by gas flow in a porous N2 layer with a block size on the order of a meter can supply the required amount of gas to a source region about 1 km in radius. The decline of gas output to steady state may occur over a period comparable with the inferred active geyser lifetime of 5 earth years. The required subsurface permeability may be maintained by thermal fracturing of the residual N2 polar cap. A lower limit on geyser source radius of about 50 to 100 m predicted by a theory of negatively buoyant jets is not readily attained.

  4. Eruptions at Lone Star geyser, Yellowstone National Park, USA: 2. Constraints on subsurface dynamics

    Science.gov (United States)

    Vandemeulebrouck, Jean; Sohn, Robert A.; Rudolph, Maxwell L.; Hurwitz, Shaul; Manga, Michael; Johnston, Malcolm J.S.; Soule, S. Adam; McPhee, Darcy K.; Glen, Jonathan M.G.; Karlstrom, Leif; Murphy, Fred

    2014-01-01

    We use seismic, tilt, lidar, thermal, and gravity data from 32 consecutive eruption cycles of Lone Star geyser in Yellowstone National Park to identify key subsurface processes throughout the geyser's eruption cycle. Previously, we described measurements and analyses associated with the geyser's erupting jet dynamics. Here we show that seismicity is dominated by hydrothermal tremor (~5–40 Hz) attributed to the nucleation and/or collapse of vapor bubbles. Water discharge during eruption preplay triggers high-amplitude tremor pulses from a back azimuth aligned with the geyser cone, but during the rest of the eruption cycle it is shifted to the east-northeast. Moreover, ~4 min period ground surface displacements recur every 26 ± 8 min and are uncorrelated with the eruption cycle. Based on these observations, we conclude that (1) the dynamical behavior of the geyser is controlled by the thermo-mechanical coupling between the geyser conduit and a laterally offset reservoir periodically filled with a highly compressible two-phase mixture, (2) liquid and steam slugs periodically ascend into the shallow crust near the geyser system inducing detectable deformation, (3) eruptions occur when the pressure decrease associated with overflow from geyser conduit during preplay triggers an unstable feedback between vapor generation (cavitation) and mass discharge, and (4) flow choking at a constriction in the conduit arrests the runaway process and increases the saturated vapor pressure in the reservoir by a factor of ~10 during eruptions.

  5. Evaluation of efficiency in Japan electric power companies

    International Nuclear Information System (INIS)

    Ghaderi, F.; Muyajima, M.

    2001-01-01

    Achieving energy efficiency also must consider supply efficiency, how much energy it takes to generate electricity and transmit it to the end user. system efficiency reflects the loss of energy during the processes of generation, transmission and distribution of electricity. Of the millions of tons of coal that are burned to produce heat in generation of electricity every year, only one third is converted into electricity.The electric power plant immediately uses 5 to 10 percent of that energy for use in the plant. Around another 10 percent of this energy is consumed in the transmission and distribution of electric energy to end users. Overall,more that 70 percent of the energy used to produce and deliver electricity never gets to the end user. The costs of this wasted energy are reflected in the customer's electricity bill. Furthermore, once delivered, users of electricity are subjected to more h idden c osts the demand charge which reflects the rate at which consumers draw energy from the power plant during a particular time of day, are also affected by the time of year. This additional charge c n be dramatic. For example, the cost for using electric air conditioning at the w rong t ime of the day , are also affected by the time of year. This additional charge can be dramatic. For example, the cost for using electric air conditioning at the wrong time of the day could be as much as 25 to 40 percent higher than what a facility normally pays for electricity during off-peak times. Minimizing the costs of operations, therefor, is a must for all electric companies. In the other hand utility rates, such as the cost of electricity, are a necessary element of operating in all enterprises.In some industries the payment over electricity make a large percentage of their total expenses, but that doesn't mean that every effort should not be made to reduce their impact on the bottom line, it should be considered that a very small change in operating procedure can change

  6. An International Survey of Electric Storage Tank Water Heater Efficiency and Standards

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, Alissa; Lutz, James; McNeil, Michael A.; Covary, Theo

    2013-11-13

    Water heating is a main consumer of energy in households, especially in temperate and cold climates. In South Africa, where hot water is typically provided by electric resistance storage tank water heaters (geysers), water heating energy consumption exceeds cooking, refrigeration, and lighting to be the most consumptive single electric appliance in the home. A recent analysis for the Department of Trade and Industry (DTI) performed by the authors estimated that standing losses from electric geysers contributed over 1,000 kWh to the annual electricity bill for South African households that used them. In order to reduce this burden, the South African government is currently pursuing a programme of Energy Efficiency Standards and Labelling (EES&L) for electric appliances, including geysers. In addition, Eskom has a history of promoting heat pump water heaters (HPWH) through incentive programs, which can further reduce energy consumption. This paper provides a survey of international electric storage water heater test procedures and efficiency metrics which can serve as a reference for comparison with proposed geyser standards and ratings in South Africa. Additionally it provides a sample of efficiency technologies employed to improve the efficiency of electric storage water heaters, and outlines programs to promote adoption of improved efficiency. Finally, it surveys current programs used to promote HPWH and considers the potential for this technology to address peak demand more effectively than reduction of standby losses alone

  7. Protecting the Geyser Basins of Yellowstone National Park: Toward a New National Policy for a Vulnerable Environmental Resource

    Science.gov (United States)

    Barrick, Kenneth A.

    2010-01-01

    Geyser basins provide high value recreation, scientific, economic and national heritage benefits. Geysers are globally rare, in part, because development activities have quenched about 260 of the natural endowment. Today, more than half of the world’s remaining geysers are located in Yellowstone National Park, northwest Wyoming, USA. However, the hydrothermal reservoirs that supply Yellowstone’s geysers extend well beyond the Park borders, and onto two “Known Geothermal Resource Areas”—Island Park to the west and Corwin Springs on the north. Geysers are sensitive geologic features that are easily quenched by nearby geothermal wells. Therefore, the potential for geothermal energy development adjacent to Yellowstone poses a threat to the sustainability of about 500 geysers and 10,000 hydrothermal features. The purpose here is to propose that Yellowstone be protected by a “Geyser Protection Area” (GPA) extending in a 120-km radius from Old Faithful Geyser. The GPA concept would prohibit geothermal and large-scale groundwater wells, and thereby protect the water and heat supply of the hydrothermal reservoirs that support Yellowstone’s geyser basins and important hot springs. Proactive federal leadership, including buyouts of private groundwater development rights, can assist in navigating the GPA through the greater Yellowstone area’s “wicked” public policy environment. Moreover, the potential impacts on geyser basins from intrusive research sampling techniques are considered in order to facilitate the updating of national park research regulations to a precautionary standard. The GPA model can provide the basis for protecting the world’s few remaining geyser basins.

  8. The Electric Company Writers' Notebook.

    Science.gov (United States)

    Children's Television Workshop, New York, NY.

    This handbook outlines the curriculum objectives for the children's television program, "The Electric Company." The first portion of the text delineates strategies for teaching symbol/sound analysis, including units on blends, letter groups, and word structure. A second section addresses strategies for reading for meaning, including…

  9. Enceladus' 101 Geysers: Phantoms? Hardly

    Science.gov (United States)

    Porco, C.; Nimmo, F.; DiNino, D.

    2015-12-01

    The discovery by the Cassini mission of present-day geysering activity capping the southern hemisphere of Saturn's moon Enceladus (eg, Porco, C. C. et al. Science 311, 1393, 2006) and sourced within a subsurface body of liquid water (eg, Postberg, F. et al. Nature 459, 1098, 2009; Porco, C.C. et al. AJ 148, 45, 2014, hereafter PEA], laced with organic compounds (eg, Waite, J.H. et al. Science 311, 1419, 2006), has been a significant one, with far-reaching astrobiological implications. In an extensive Cassini imaging survey of the moon's south polar terrain (SPT), PEA identified 101 distinct, narrow jets of small icy particles erupting, with varying strengths, from the four major fractures crossing the SPT. A sufficient spread in stereo angles of the 107 images used in that work allowed (in some cases, many) pair-wise triangulations to be computed; precise surface locations were derived for 98 jets. Recently, it has been claimed (Spitale, J.N. et al. Nature 521, 57, 2015) that the majority of the geysers are not true discrete jets, but are "phantoms" that appear in shallow-angle views of a dense continuous curtain of material with acute bends in it. These authors also concluded that the majority of the eruptive material is not in the form of jets but in the form of fissure-style 'curtain' eruptions. We argue below the contrary, that because almost all the moon's geysers were identified by PEA using multiple images with favorable viewing geometries, the vast majority of them, and likely all, are discrete jets. Specifically, out of 98 jets, no fewer than 90 to 95 were identified with viewing geometries that preclude the appearance of phantoms. How the erupting solids (i.e., icy particles) that are seen in Cassini images are partitioned between jets and inter-jet curtains is still an open question.

  10. Public service impacts of geothermal development: cumulative impacts study of the Geysers KGRA. Final staff report

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, K.M.

    1983-07-01

    The number of workers currently involved in the various aspects of geothermal development in the Geysers are identified. Using two different development scenarios, projections are made for the number of power plants needed to reach the electrical generation capacity of the steam resource in the Geysers. The report also projects the cumulative number of workers needed to develop the steam field and to construct, operate, and maintain these power plants. Although the number of construction workers fluctuates, most are not likely to become new, permanent residents of the KGRA counties. The administrative and public service costs of geothermal development to local jurisdications are examined, and these costs are compared to geothermal revenues accruing to the local governments. Revenues do not cover the immediate fiscal needs resulting from increases in local road maintenance and school enrollment attributable to geothermal development. Several mitigation options are discussed and a framework presented for calculating mitigation costs for school and road impacts.

  11. Electric utility companies and geothermal power

    Science.gov (United States)

    Pivirotto, D. S.

    1976-01-01

    The requirements of the electric utility industry as the primary potential market for geothermal energy are analyzed, based on a series of structured interviews with utility companies and financial institution executives. The interviews were designed to determine what information and technologies would be required before utilities would make investment decisions in favor of geothermal energy, the time frame in which the information and technologies would have to be available, and the influence of the governmental politics. The paper describes the geothermal resources, electric utility industry, its structure, the forces influencing utility companies, and their relationship to geothermal energy. A strategy for federal stimulation of utility investment in geothermal energy is suggested. Possibilities are discussed for stimulating utility investment through financial incentives, amelioration of institutional barriers, and technological improvements.

  12. Heretic or rebel? The heresy trial of Albert Geyser

    Directory of Open Access Journals (Sweden)

    Wim Dreyer

    2016-11-01

    Full Text Available During September 1961, a charge of heresy was laid against New Testament scholar and antiapartheid activist Prof. A.S. (Albert Geyser. The charge was brought by three senior theological students of the University of Pretoria. They accused Geyser of interpreting Philippians 2 in such a way that it undermined the church’s doctrine of Christ’s pre-existence. The heresy trial started on 24 October 1961 under massive public interest. The trial lasted 6 months and the proceedings covered 2672 typed pages. Reporters of 25 national and international newspapers attended the trial. The heresy trial caused widespread international condemnation of what was regarded as an orchestrated attempt to get rid of Geyser, because of his public and radical opposition to apartheid. In this contribution, Geyser’s theological critique of apartheid as well as his conviction of heresy is discussed. The proceedings of the trial, minutes of the moderature, media coverage and Geyser’s publications serve as primary sources. It concludes with a critical evaluation of Geyser’s theology and his role as a public theologian.

  13. Triggering and modulation of geyser eruptions in Yellowstone National Park by earthquakes, earth tides, and weather

    Science.gov (United States)

    Hurwitz, Shaul; Sohn, Robert A.; Luttrell, Karen; Manga, Michael

    2014-01-01

    We analyze intervals between eruptions (IBEs) data acquired between 2001 and 2011 at Daisy and Old Faithful geysers in Yellowstone National Park. We focus our statistical analysis on the response of these geysers to stress perturbations from within the solid earth (earthquakes and earth tides) and from weather (air pressure and temperature, precipitation, and wind). We conclude that (1) the IBEs of these geysers are insensitive to periodic stresses induced by solid earth tides and barometric pressure variations; (2) Daisy (pool geyser) IBEs lengthen by evaporation and heat loss in response to large wind storms and cold air; and (3) Old Faithful (cone geyser) IBEs are not modulated by air temperature and pressure variations, wind, and precipitation, suggesting that the subsurface water column is decoupled from the atmosphere. Dynamic stress changes of 0.1−0.2 MPa resulting from the 2002 M-7.9 Denali, Alaska, earthquake surface waves caused a statistically significant shortening of Daisy geyser's IBEs. Stresses induced by other large global earthquakes during the study period were at least an order of magnitude smaller. In contrast, dynamic stresses of >0.5 MPa from three large regional earthquakes in 1959, 1975, and 1983 caused lengthening of Old Faithful's IBEs. We infer that most subannual geyser IBE variability is dominated by internal processes and interaction with other geysers. The results of this study provide quantitative bounds on the sensitivity of hydrothermal systems to external stress perturbations and have implications for studying the triggering and modulation of volcanic eruptions by external forces.

  14. Anatomy of Old Faithful from subsurface seismic imaging of the Yellowstone Upper Geyser Basin

    KAUST Repository

    Wu, Sin-Mei; Ward, Kevin M.; Farrell, Jamie; Lin, Fan-Chi; Karplus, Marianne; Smith, Robert B.

    2017-01-01

    The Upper Geyser Basin in Yellowstone National Park contains one of the highest concentrations of hydrothermal features on Earth including the iconic Old Faithful geyser. Although this system has been the focus of many geological, geochemical

  15. A Bayesian stochastic frontier analysis of Chinese fossil-fuel electricity generation companies

    International Nuclear Information System (INIS)

    Chen, Zhongfei; Barros, Carlos Pestana; Borges, Maria Rosa

    2015-01-01

    This paper analyses the technical efficiency of Chinese fossil-fuel electricity generation companies from 1999 to 2011, using a Bayesian stochastic frontier model. The results reveal that efficiency varies among the fossil-fuel electricity generation companies that were analysed. We also focus on the factors of size, location, government ownership and mixed sources of electricity generation for the fossil-fuel electricity generation companies, and also examine their effects on the efficiency of these companies. Policy implications are derived. - Highlights: • We analyze the efficiency of 27 quoted Chinese fossil-fuel electricity generation companies during 1999–2011. • We adopt a Bayesian stochastic frontier model taking into consideration the identified heterogeneity. • With reform background in Chinese energy industry, we propose four hypotheses and check their influence on efficiency. • Big size, coastal location, government control and hydro energy sources all have increased costs

  16. 78 FR 76045 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2013-12-16

    ... Airworthiness Directives; General Electric Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA... (AD) for General Electric Company (GE) GE90-110B1 and GE90-115B turbofan engines with certain high... turbofan engines with high pressure compressor (HPC) rotor stage 2-5 spools, part numbers (P/Ns) 351-103...

  17. 78 FR 50320 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2013-08-19

    ... Airworthiness Directives; General Electric Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA... Electric Company (GE) model GEnx-2B67B turbofan engines with booster anti-ice (BAI) air duct, part number...-2B67 turbofan engine be removed from the Applicability section of this AD. The commenters noted that...

  18. 77 FR 3088 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2012-01-23

    ... Airworthiness Directives; General Electric Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA... Electric Company (GE) CF34-10E series turbofan engines. This AD was prompted by a report of heavy wear... turbofan engines installed on airplanes of U.S. registry. We also estimate that it will take about 8 work...

  19. Status of the S.E. Geysers effluent pipeline & injection project

    Energy Technology Data Exchange (ETDEWEB)

    Dellinger, M. [Lake County Sanitation District, Lakeport, CA (United States)

    1997-12-31

    A unique public/private partnership of local, state, federal, and corporate stakeholders is constructing the world`s first wastewater-to-electricity system in Lake County, California. A rare example of a genuinely {open_quotes}sustainable{close_quotes} system, three Lake County communities will recycle their treated wastewater effluent through the Geysers geothermal steamfield to produce an estimated 625,000 MWh of electricity annually from six existing geothermal power plants. The concept is shown schematically. Construction was initiated in October 1995, and as of this writing, the system is approximately 85% complete. Operational start-up is expected in October 1997. The key to the project`s success thus far has been its emphasis on cooperative action among affected stakeholders; and a broad, community-based view of solving problems rather than the traditional, narrower view of engineering-driven technical solutions. Special attention has been given to environmentally-responsive engineering design to avoid or minimize adverse environmental impacts.

  20. Memorial 1997 - ENDESA (Chilean Electricity Company)

    International Nuclear Information System (INIS)

    1998-01-01

    This report provides a comprehensive survey, in depth assessment of the activities overview of ENDESA, Chilean Electricity Company, highlighting economical information and including historical and technical aspects. Economics is its focal point, but other relevant data are shown, like technical data on hydroelectric and thermoelectric power plants. Main activities developed by ENDESA are described, such in Chile as in the foreign. Data on power generation, transmission and transport are also presented and an economical balance of each colligated company are done and analysed

  1. Santa Rosa Geysers Recharge Project: GEO-98-001. Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Brauner, Edwin Jr.; Carlson, Daniel C.

    2002-10-01

    The Geysers steamfields in northern Sonoma County have produced reliable ''green'' power for many years. An impediment to long-term continued production has been the ability to provide a reliable source of injection water to replace water extracted and lost in the form of steam. The steamfield operators have historcially used cooling towers to recycle a small portion of the steam and have collected water during the winter months using stream extraction. These two sources, however, could not by themselves sustain the steamfield in the long term. The Lake County Reclaimed Water Project (SEGEP) was inititated in 1997 and provides another source of steamfield replenishment water. The Santa Rosa Geysers Recharge Project provides another significant step in replenishing the steamfield. In addition, the Santa Rosa Geysers Recharge Project has been built with capacity to potentially meet virtually all injection water requirements, when combined with these other sources. Figure 2.1 graphically depicts the combination of injection sources.

  2. MODERN ELECTRIC CARS OF TESLA MOTORS COMPANY

    OpenAIRE

    O. F. Vynakov; E. V. Savolova; A. I. Skrynnyk

    2016-01-01

    This overview article shows the advantages of a modern electric car as compared with internal combustion cars by the example of the electric vehicles of Tesla Motors Company. It (в смысле- статья) describes the history of this firm, provides technical and tactical characteristics of three modifications of electric vehicles produced by Tesla Motors. Modern electric cars are not less powerful than cars with combustion engines both in speed and acceleration amount. They are reliable, economical ...

  3. Red Geyser: A New Class of Galaxy with Large-scale AGN-driven Winds

    Science.gov (United States)

    Roy, Namrata; Bundy, Kevin; Cheung, Edmond; MaNGA Team

    2018-01-01

    A new class of quiescent (non-star-forming) galaxies harboring possible AGN-driven winds have been discovered using the spatially resolved optical spectroscopy from the ongoing SDSS-IV MaNGA (Sloan Digital Sky Survey-IV Mapping Nearby Galaxies at Apache Point Observatory) survey. These galaxies named "red geysers" constitute 5%-10% of the local quiescent galaxy population and are characterized by narrow bisymmetric ionized gas emission patterns. These enhanced patterns are seen in equivalent width maps of Hα, [OIII] and other strong emission lines. They are co-aligned with the ionized gas velocity gradients but significantly misaligned with stellar velocity gradients. They also show very high gas velocity dispersions (~200 km/s). Considering these observations in light of models of the gravitational potential, Cheung et al. argued that red geysers host large-scale AGN-driven winds of ionized gas that may play a role in suppressing star formation at late times. In this work, we test the hypothesis that AGN activity is ultimately responsible for the red geyser phenomenon. We compare the nuclear radio activity of the red geysers to a matched control sample of galaxies of similar stellar mass, redshift, rest frame NUV–r color and axis ratio. and additionally, control for the presence of ionized gas. We have used 1.4 GHz radio continuum data from the VLA FIRST Survey to stack the radio flux from the red geyser sample and control sample. We find that the red geysers have a higher average radio flux than the control galaxies at > 3σ significance. Our sample is restricted to rest-frame NUV–r color > 5, thus ruling out possible radio emission due to star formation activity. We conclude that red geysers are associated with more active AGN, supporting a feedback picture in which episodic AGN activity drives large-scale but relatively weak ionized winds in many in many early-type galaxies.

  4. 77 FR 4650 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2012-01-31

    ... Airworthiness Directives; General Electric Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA... General Electric Company (GE) CF6-45 and CF6-50 series turbofan engines with certain low-pressure turbine... Compliance We estimate that this AD will affect 387 CF6-45 and CF6-50 series turbofan engines installed on...

  5. 78 FR 72567 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2013-12-03

    ... Airworthiness Directives; General Electric Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA... General Electric Company (GE) GE90-110B1 and -115B turbofan engines. This AD was prompted by multiple... turbofan engines with variable bypass valve (VBV) actuator fuel supply tube, part number (P/N) 2165M22P01...

  6. 78 FR 38195 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2013-06-26

    ... Directives; General Electric Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA), DOT... all General Electric Company (GE) GE90-110B1 and GE90-115B turbofan engines. This emergency AD was.... owners and operators of these GE90-110B1 and GE90-115B turbofan engines. This action was prompted by...

  7. 78 FR 47534 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2013-08-06

    ... Airworthiness Directives; General Electric Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA... directive (AD) 2013-14-51 for General Electric Company (GE) GE90-110B1 and GE90-115B turbofan engines with... all known U.S. owners and operators of GE90-110B1 and GE90-115B turbofan engines. AD 2013-14-51...

  8. 78 FR 24671 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2013-04-26

    ... Airworthiness Directives; General Electric Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA... certain General Electric Company (GE) CF6-80C2 series turbofan engines. That AD currently requires.../B1F/B2F/B4F/B6F/B7F/D1F turbofan engines with any of the following installed: (1) Fuel tube, part...

  9. 78 FR 19983 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2013-04-03

    ... Airworthiness Directives; General Electric Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA... Electric Company (GE) CF34-8C and CF34-8E turbofan engines with certain part numbers (P/N) of operability...-8E6, and CF34-8E6A1 turbofan engines, with an operability bleed valve (OBV) part number (P/N...

  10. Imaging Seismic Source Variations Using Back-Projection Methods at El Tatio Geyser Field, Northern Chile

    Science.gov (United States)

    Kelly, C. L.; Lawrence, J. F.

    2014-12-01

    During October 2012, 51 geophones and 6 broadband seismometers were deployed in an ~50x50m region surrounding a periodically erupting columnar geyser in the El Tatio Geyser Field, Chile. The dense array served as the seismic framework for a collaborative project to study the mechanics of complex hydrothermal systems. Contemporaneously, complementary geophysical measurements (including down-hole temperature and pressure, discharge rates, thermal imaging, water chemistry, and video) were also collected. Located on the western flanks of the Andes Mountains at an elevation of 4200m, El Tatio is the third largest geyser field in the world. Its non-pristine condition makes it an ideal location to perform minutely invasive geophysical studies. The El Jefe Geyser was chosen for its easily accessible conduit and extremely periodic eruption cycle (~120s). During approximately 2 weeks of continuous recording, we recorded ~2500 nighttime eruptions which lack cultural noise from tourism. With ample data, we aim to study how the source varies spatially and temporally during each phase of the geyser's eruption cycle. We are developing a new back-projection processing technique to improve source imaging for diffuse signals. Our method was previously applied to the Sierra Negra Volcano system, which also exhibits repeating harmonic and diffuse seismic sources. We back-project correlated seismic signals from the receivers back to their sources, assuming linear source to receiver paths and a known velocity model (obtained from ambient noise tomography). We apply polarization filters to isolate individual and concurrent geyser energy associated with P and S phases. We generate 4D, time-lapsed images of the geyser source field that illustrate how the source distribution changes through the eruption cycle. We compare images for pre-eruption, co-eruption, post-eruption and quiescent periods. We use our images to assess eruption mechanics in the system (i.e. top-down vs. bottom-up) and

  11. Physical interpretation of geysering phenomena and periodic boiling instability at low flows

    International Nuclear Information System (INIS)

    Duffey, R.B.; Rohatgi, U.S.

    1996-01-01

    Over 30 years ago, Griffith showed that unstable and periodic initial boiling occurred in stagnant liquids in heated pipes coupled to a cooler or condensing plenum volume. This was called ''geysering'', and is a similar phenomenon to the rapid nucleation and voiding observed in tubes filled with superheated liquid. It is also called ''bumping'' when non-uniformly heated water or a chemical suddenly boils in laboratory glassware. In engineering, the stability and predictability has importance to the onset of bulk boiling in a natural and forced circulation loops. The latest available data show the observed stability and periodicity of the onset of boiling flow when there is a plenum, multiple heated channels, and a sustained subcooling in a circulating loop. We examine the available data, both old and new, and develop a new theory to illustrate the simple physics causing the observed periodicity of the flow. We examine the validity of the theory by comparison to all the geysering data, and develop a useful and simple correlation. We illustrate the equivalence of the onset of geysering to the onset of static instability in subcooled boiling. We also derive the stability boundary for geysering, utilizing turbulent transport analysis to determine the effects of pressure and other key parameters. This new result explains the greater stability region observed at higher pressures. The paper builds on the 30 years of quite independent thermal hydraulic work that is still fresh and useful today. We discuss the physical interpretation of geysering onset with a consistent theory, and show where refinements would be useful to the data correlations

  12. LOGISTICS ASPECTS OF PRACTICAL MARKETING IN ELECTRICITY COMPANY

    OpenAIRE

    Ewa Moroz

    2008-01-01

    An anonymous questionnaire was presented to employees of an electricity distribution company - Enion Grupa Tauron S.A. – Department Czestochowa. The research, in the part presented in this paper, referred to company-customer relations and to an influence that those relations have on costs and quality of work in the company, mainly in the aspect of employees’ understanding of those connections. In the paper author states the conclusion that suggests implementation of Lean Thinking procedures i...

  13. Anatomy of Old Faithful from subsurface seismic imaging of the Yellowstone Upper Geyser Basin

    KAUST Repository

    Wu, Sin-Mei

    2017-10-03

    The Upper Geyser Basin in Yellowstone National Park contains one of the highest concentrations of hydrothermal features on Earth including the iconic Old Faithful geyser. Although this system has been the focus of many geological, geochemical, and geophysical studies for decades, the shallow (<200 m) subsurface structure remains poorly characterized. To investigate the detailed subsurface geologic structure including the hydrothermal plumbing of the Upper Geyser Basin, we deployed an array of densely spaced three-component nodal seismographs in November of 2015. In this study, we extract Rayleigh-wave seismic signals between 1-10 Hz utilizing non-diffusive seismic waves excited by nearby active hydrothermal features with the following results. 1) imaging the shallow subsurface structure by utilizing stationary hydrothermal activity as a seismic source, 2) characterizing how local geologic conditions control the formation and location of the Old Faithful hydrothermal system, and 3) resolving a relatively shallow (10-60 m) and large reservoir located ~100 m southwest of Old Faithful geyser.

  14. Nuclear geyser model of the origin of life: Driving force to promote the synthesis of building blocks of life

    Directory of Open Access Journals (Sweden)

    Toshikazu Ebisuzaki

    2017-03-01

    Full Text Available We propose the nuclear geyser model to elucidate an optimal site to bear the first life. Our model overcomes the difficulties that previously proposed models have encountered. Nuclear geyser is a geyser driven by a natural nuclear reactor, which was likely common in the Hadean Earth, because of a much higher abundance of 235U as nuclear fuel. The nuclear geyser supplies the following: (1 high-density ionizing radiation to promote chemical chain reactions that even tar can be used for intermediate material to restart chemical reactions, (2 a system to maintain the circulation of material and energy, which includes cyclic environmental conditions (warm/cool, dry/wet, etc. to enable to produce complex organic compounds, (3 a lower temperature than 100 °C as not to break down macromolecular organic compounds, (4 a locally reductive environment depending on rock types exposed along the geyser wall, and (5 a container to confine and accumulate volatile chemicals. These five factors are the necessary conditions that the birth place of life must satisfy. Only the nuclear geyser can meet all five, in contrast to the previously proposed birth sites, such as tidal flat, submarine hydrothermal vent, and outer space. The nuclear reactor and associated geyser, which maintain the circulations of material and energy with its surrounding environment, are regarded as the nuclear geyser system that enables numerous kinds of chemical reactions to synthesize complex organic compounds, and where the most primitive metabolism could be generated.

  15. 78 FR 43197 - Duke Energy Florida, Inc.; Florida Power & Light Company; Tampa Electric Company; Orlando...

    Science.gov (United States)

    2013-07-19

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [ER13-1922-000; ER13-1929-000; ER13-1932-000; NJ13-11-000] Duke Energy Florida, Inc.; Florida Power & Light Company; Tampa Electric Company; Orlando Utilities Commission; Notice of Compliance Filings Take notice that on July 10, 2013, Duke Energy...

  16. Hawaiian Electric Company Demand Response Roadmap Project

    Energy Technology Data Exchange (ETDEWEB)

    Levy, Roger [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Kiliccote, Sila [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2013-01-12

    The objective of this project was to develop a “roadmap” to guide the Hawaiian Electric Company (HECO) demand response (DR) planning and implementation in support of the Hawaii Clean Energy Initiative (HCEI) 70% clean energy goal by 2030.

  17. Chemical analyses of waters from geysers, hot springs, and pools in Yellowstone National Park, Wyoming from 1974 to 1978

    Energy Technology Data Exchange (ETDEWEB)

    Thompson, J.M.; Yadav, S.

    1979-01-01

    Waters from geysers, hot springs, and pools of Yellowstone National Park have been analyzed. We report 422 complete major ion analyses from 330 different locations of geysers, hot springs, and pools, collected from 1974 to 1978. Many of the analyses from Upper, Midway, Lower, and Norris Geyser Basin are recollections of features previously reported.

  18. Tool for the control management of electric and magnetic fields of electrical companies

    International Nuclear Information System (INIS)

    Arnera, Patricia; Barbieri, Beatriz

    2008-01-01

    The use of electricity involves a wide range of activities that, because of its diversity, characteristics and relative importance causes different environmental impacts during the extraction, processing, transport and consuming activities. It is the role of the government to elaborate the rules for the incorporation of environmental aspects in the different segments of the market for different electrical energy sources and in all the stages of the process, from the initial evaluation to the construction and exploitation phases. Among the environmental key aspects to considerate, are the electric and magnetic fields, in which society has taken special interest as they are believed to be involved in health hazard. The faculties of the regulatory authority are dictate regulations and technique procedures to be fulfilled by the agents, and check their compliance. In the course of time since the mentioned obligations, the authority has gathered information regarding electric and magnetic fields that includes those planned in the Companies Environmental Planning and those obtained ad-hoc in the role of controller. In order to systematize this information, a data base has been designed considering different types of electric installations, the company which they belong to, equipment used in the measurements, representative layouts with measure points and profiles of the electric and magnetic fields that were obtained. (author)

  19. Tool for the control management of electric and magnetic fields of electrical companies

    Energy Technology Data Exchange (ETDEWEB)

    Arnera, Patricia; Barbieri, Beatriz [La Plata Univ. Nacional (Argentina). Facultad de Ingenieria, Instituto de Investigaciones Tecnologicas para Redes y Equipos; Turco, Joaquin; Messina, Juan; Postiglioni, Osvaldo [Ente Nacional Regulador de la Electricidad, Buenos Aires (Argentina)

    2008-07-01

    The use of electricity involves a wide range of activities that, because of its diversity, characteristics and relative importance causes different environmental impacts during the extraction, processing, transport and consuming activities. It is the role of the government to elaborate the rules for the incorporation of environmental aspects in the different segments of the market for different electrical energy sources and in all the stages of the process, from the initial evaluation to the construction and exploitation phases. Among the environmental key aspects to considerate, are the electric and magnetic fields, in which society has taken special interest as they are believed to be involved in health hazard. The faculties of the regulatory authority are dictate regulations and technique procedures to be fulfilled by the agents, and check their compliance. In the course of time since the mentioned obligations, the authority has gathered information regarding electric and magnetic fields that includes those planned in the Companies Environmental Planning and those obtained ad-hoc in the role of controller. In order to systematize this information, a data base has been designed considering different types of electric installations, the company which they belong to, equipment used in the measurements, representative layouts with measure points and profiles of the electric and magnetic fields that were obtained. (author)

  20. MODERN ELECTRIC CARS OF TESLA MOTORS COMPANY

    Directory of Open Access Journals (Sweden)

    O. F. Vynakov

    2016-08-01

    Full Text Available This overview article shows the advantages of a modern electric car as compared with internal combustion cars by the example of the electric vehicles of Tesla Motors Company. It (в смысле- статья describes the history of this firm, provides technical and tactical characteristics of three modifications of electric vehicles produced by Tesla Motors. Modern electric cars are not less powerful than cars with combustion engines both in speed and acceleration amount. They are reliable, economical and safe in operation. With every year the maximum range of an electric car is increasing and its battery charging time is decreasing.Solving the problem of environmental safety, the governments of most countries are trying to encourage people to switch to electric cars by creating subsidy programs, lending and abolition of taxation. Therefore, the advent of an electric vehicle in all major cities of the world is inevitable.

  1. 76 FR 36533 - Bangor Hydro Electric Company; Notice of Request for Waiver

    Science.gov (United States)

    2011-06-22

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. TS11-5-000] Bangor Hydro Electric Company; Notice of Request for Waiver Take notice that on June 13, 2011, pursuant to section 358.1(d) of the Commission's regulations, 18 CFR 358.1(d) (2011), Bangor Hydro Electric Company (Bangor...

  2. Successful diversification strategies of electricity companies: An explorative empirical study on the success of different diversification strategies of German electricity companies in the wake of the European market liberalization

    International Nuclear Information System (INIS)

    Mueller, Ralf; Steinert, Martin; Teufel, Stephanie

    2008-01-01

    Based on the EC directive 96/92, the liberalization of electricity markets is forcing electricity companies, to rethink their product and market strategy. However, neither the level of the initiated diversification efforts of former monopolies, nor their direction or their success are known or have been analyzed before. Therefore, Mueller [2006. Diversifikationsstrategien von Stromversorgungsunternehmen: Handlungsempfehlungen fuer schweizerische Stromversorgungsunternehmen auf der Basis einer empirischen Analyse des liberalisierten deutschen Strommarktes. IIMT University Press, Fribourg] has quantitatively determined the extent and direction of the diversification efforts in the electricity sector. Additionally, based on an exploratory case study research, successful diversification strategies have been identified and incorporated into 73 observations which form the basis of a set of normative recommendations for diversifying electricity companies. Since the analyses are based on the German electricity market, which fully liberalized earlier than most of its continental European counterparts, the results may especially guide other European electricity companies in their strategic diversification decisions. This paper publishes both the quantitative analysis on the degree and extents of diversification (sample time frame 1995-2000) as well as the qualitative analysis on the success of diversification strategies (sample time frame 1995-2003). Additionally, based on the obtained explorative observations, the diversification strategy of an idealized-electricity company is firstly presented for practitioners as normative recommendation, and secondly for academics, as starting point for future quantitative analysis framework. (author)

  3. Gas and Isotope Geochemistry of 81 Steam Samples from Wells in The Geysers Geothermal Field, Sonoma and Lake Counties, California

    Science.gov (United States)

    Lowenstern, Jacob B.; Janik, Cathy J.; Fahlquist, Lynne; Johnson, Linda S.

    1999-01-01

    The Geysers geothermal field in northern California, with about 2000-MW electrical capacity, is the largest geothermal field in the world. Despite its importance as a resource and as an example of a vapor-dominated reservoir, very few complete geochemical analyses of the steam have been published (Allen and Day, 1927; Truesdell and others, 1987). This report presents data from 90 steam, gas, and condensate samples from wells in The Geysers geothermal field in northern California. Samples were collected between 1978 and 1991. Well attributes include sampling date, well name, location, total depth, and the wellhead temperature and pressure at which the sample was collected. Geochemical characteristics include the steam/gas ratio, composition of noncondensable gas (relative proportions of CO2, H2S, He, H2, O2, Ar, N2, CH4, and NH3), and isotopic values for deltaD and delta18O of H2O, delta13C of CO2, and delta34S of H2S. The compilation includes 81 analyses from 74 different production wells, 9 isotopic analyses of steam condensate pumped into injection wells, and 5 complete geochemical analyses on gases from surface fumaroles and bubbling pools. Most samples were collected as saturated steam and plot along the liquid-water/steam boiling curve. Steam-togas ratios are highest in the southeastern part of the geothermal field and lowest in the northwest, consistent with other studies. Wells in the Northwest Geysers are also enriched in N2/Ar, CO2 and CH4, deltaD, and delta18O. Well discharges from the Southeast Geysers are high in steam/gas and have isotopic compositions and N2/Ar ratios consistent with recharge by local meteoric waters. Samples from the Central Geysers show characteristics found in both the Southeast and Northwest Geysers. Gas and steam characteristics of well discharges from the Northwest Geysers are consistent with input of components from a high-temperature reservoir containing carbonrich gases derived from the host Franciscan rocks. Throughout the

  4. Testing for the 'predictability' of dynamically triggered earthquakes in The Geysers geothermal field

    Science.gov (United States)

    Aiken, Chastity; Meng, Xiaofeng; Hardebeck, Jeanne

    2018-03-01

    The Geysers geothermal field is well known for being susceptible to dynamic triggering of earthquakes by large distant earthquakes, owing to the introduction of fluids for energy production. Yet, it is unknown if dynamic triggering of earthquakes is 'predictable' or whether dynamic triggering could lead to a potential hazard for energy production. In this paper, our goal is to investigate the characteristics of triggering and the physical conditions that promote triggering to determine whether or not triggering is in anyway foreseeable. We find that, at present, triggering in The Geysers is not easily 'predictable' in terms of when and where based on observable physical conditions. However, triggered earthquake magnitude positively correlates with peak imparted dynamic stress, and larger dynamic stresses tend to trigger sequences similar to mainshock-aftershock sequences. Thus, we may be able to 'predict' what size earthquakes to expect at The Geysers following a large distant earthquake.

  5. The enthalpy of the heat-carrying fluids and the energy of eruption of velican geyser, Kamchatka, U.S.S.R.

    Science.gov (United States)

    Steinberg, G. S.

    1980-10-01

    The enthalphy of the heat carrying fluids liquid water or mixture of water plus steam) which feeds the biggest Kamchatka geyser, Velican is obtained from the critical quantity of heat Q critical, which is the net heat lost during the previous eruption and must be resupplied (stored) to trigger the next eruption. There are two unknowns in the heat balance equation for the geyser that cannot be determined from observations on the geyser in its natural state: critical and the enthalpy of the heat-carrying fluids Io. In order to obtain a system of two equations for unambiguous determination of these parameters, we made temporary physical changes that affected the natural interval between geyser eruptions and constructed the heat balance equations for the different regimes (i.e., natural and induced intervals). The changes in interval of Velican geyser were achieved by changing the area of its surface pool, using dams. For geysers with large surface pool areas, the heat loss from the surface (mainly through evaporation) is of the same order and sometimes larger than the losses from discharge of hot water. The change of surface pool area for Velican geyser from 12 m 2 (in natural state) to 4.5 and 36.7 m 2 in experiments leads to changes of its interval from an average of 5 hours and 35 minutes in natural state to 4 hours and 59 minutes and 8 hours and 8 minutes, respectively. From the three independent equations of heat balance we obtained three sets cf values for the enthalpy, Io and the critical energy, Q critical, which differ from each other by less than 1%: Io= 176 kcal/kg ∗, Q critical = 3.78 × 10 6 kcal. The interval between eruptions of Velican geyser tends to change linearly with vent area (within our experimental range). The range or interval values (the difference between maximal and minimal periods) also depends linearly on vent area. These two systematics are due to the facts that the increase of vent surface area causes increased heat loss by

  6. Cumulative biological impacts of The Geysers geothermal development

    Energy Technology Data Exchange (ETDEWEB)

    Brownell, J.A.

    1981-10-01

    The cumulative nature of current and potential future biological impacts from full geothermal development in the steam-dominated portion of The Geysers-Calistoga KGRA are identified by the California Energy Commission staff. Vegetation, wildlife, and aquatic resources information have been reviewed and evaluated. Impacts and their significance are discussed and staff recommendations presented. Development of 3000 MW of electrical energy will result in direct vegetation losses of 2790 acres, based on an estimate of 11.5% loss per lease-hold of 0.93 acres/MW. If unmitigated, losses will be greater. Indirect vegetation losses and damage occur from steam emissions which contain elements (particularly boron) toxic to vegetation. Other potential impacts include chronic low-level boron exposure, acid rain, local climate modification, and mechanical damage. A potential exists for significant reduction and changes in wildlife from direct habitat loss and development influences. Highly erosive soils create the potential for significant reduction of aquatic resources, particularly game fish. Toxic spills have caused some temporary losses of aquatic species. Staff recommends monitoring and implementation of mitigation measures at all geothermal development stages.

  7. 76 FR 64844 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2011-10-19

    ... Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of proposed... General Electric Company (GE) CF6-45 and CF6-50 series turbofan engines with certain low-pressure turbine... series turbofan engines with certain LPT rotor stage 3 disks installed. That AD requires initial and...

  8. Testing for the ‘predictability’ of dynamically triggered earthquakes in Geysers Geothermal Field

    Science.gov (United States)

    Aiken, Chastity; Meng, Xiaofeng; Hardebeck, Jeanne L.

    2018-01-01

    The Geysers geothermal field is well known for being susceptible to dynamic triggering of earthquakes by large distant earthquakes, owing to the introduction of fluids for energy production. Yet, it is unknown if dynamic triggering of earthquakes is ‘predictable’ or whether dynamic triggering could lead to a potential hazard for energy production. In this paper, our goal is to investigate the characteristics of triggering and the physical conditions that promote triggering to determine whether or not triggering is in anyway foreseeable. We find that, at present, triggering in The Geysers is not easily ‘predictable’ in terms of when and where based on observable physical conditions. However, triggered earthquake magnitude positively correlates with peak imparted dynamic stress, and larger dynamic stresses tend to trigger sequences similar to mainshock–aftershock sequences. Thus, we may be able to ‘predict’ what size earthquakes to expect at The Geysers following a large distant earthquake.

  9. Compilation of gas geochemistry and isotopic analyses from The Geysers geothermal field: 1978-1991

    Science.gov (United States)

    Lowenstern, Jacob B.; Janik, Cathy; Fahlquist, Lynne; Johnson, Linda S.

    1999-01-01

    We present 45 chemical and isotopic analyses from well discharges at The Geysers geothermal field and summarize the most notable geochemical trends. H2 and H2S concentrations are highest in the Southeast Geysers, where steam samples have δD and δ18O values that reflect replenishment by meteoric water. In the Northwest Geysers, samples are enriched in gas/steam, CO2, CH4, and N2/Ar relative to the rest of the field, and contain steam that is elevated in δD and δ18O, most likely due to substantial contributions from Franciscan-derived fluids. The δ13C of CO2, trends in CH4 vs. N2, and abundance of NH3 indicate that the bulk of the non-condensable gases are derived from thermal breakdown of organic materials in Franciscan meta-sediments.

  10. 77 FR 76977 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2012-12-31

    ... Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Supplemental notice... proposed airworthiness directive (AD) for certain General Electric Company (GE) CF6-80C2 series turbofan... part 39 to include an AD that would apply to certain GE CF6-80C2 series turbofan engines. That NPRM...

  11. Smart Grid Innovation Management for SME Electricity Companies

    DEFF Research Database (Denmark)

    Tambo, Torben

    2011-01-01

    innovation process lies ahead for utility companies in screening, testing, maturing, implementing and operating smart grids. This process is expected to follow the political targets for CO2 reduction stretching forward until 2050. As no proven concepts exists, and as the process is expected to progress many...... years ahead, smart grid represents an excellent case of continuous innovation. The current study use a series of loosely related technological studies of smart grid related technologies in SME electricity companies to highlight critical issues in this innovation process. Major findings...... are that the companies have limited innovation capabilities, they are presented with plenty of technological offerings that eventually have to be rejected, and they suffer from absence of clear objectives....

  12. 76 FR 61687 - Pacific Gas and Electric Company

    Science.gov (United States)

    2011-10-05

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2479-011-CA] Pacific Gas and Electric Company Notice of Availability of Environmental Assessment In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission's (Commission...

  13. 77 FR 48110 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2012-08-13

    ... Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of proposed... certain General Electric Company (GE) CF6-80C2 series turbofan engines. The existing AD requires... 2000-04-14, Amendment 39-11597 (65 FR 10698, February 29, 2000), for all GE CF6-80C2 series turbofan...

  14. Selecting, engineering and constructing drilling sites at the Geysers geothermal field. Geysers chinetsu ryoiki ni okeru kussaku shikichi no sentei engineering kochiku

    Energy Technology Data Exchange (ETDEWEB)

    1993-04-01

    This paper describes some examples of selection, engineering and construction of drilling sites at the Geysers geothermal field in the northern district of California State. Steep landform, thin-layered soil and violent rainfall create unstable conditions bringing about numerous landslide in the field. Selection of a well drilling site appropriate in such conditions is started by analyzing the aerial photographs by technical staff. After site selection, prospecting and soil test are conducted and a working plan in the well site is decided to prepare engineering drawings. In the construction, land preparation, the open-cutting of base-line trench, etc. are carried out. The base-line trench is a large and sufficiently deep one which is open-cut to the front end or the middle of the bottom part of the well plateau. The final construction work is to build a leading casing for interpolating cementing. The well site construction in the Geysers geothermal field is done in consideration of protecting human life, health and properties. 1 fig.

  15. Annual report 2000 of COPEL - Electrical Company of Parana State, Brazil

    International Nuclear Information System (INIS)

    2000-01-01

    The annual report of COPEL - Electrical Company of Parana State, Brazil, during the calendar year of 2003 is presented, comprising: a management report, portraying the Company's accomplishments during the year in connection with its core businesses and a social balance sheet, addressing the Company's efforts to contribute to the development and well-being of the community by means of socially oriented projects

  16. Direct Measurement of the Volume of Liquid Water Emitted During Eruptions of Lone Star Geyser, Yellowstone National Park, Wyoming

    Science.gov (United States)

    Murphy, F.; Hurwitz, S.; Johnston, M. J.; Vandemeulebrouck, J.; Pontbriand, C.; Sohn, R. A.; Karlstrom, L.; Rudolph, M. L.

    2011-12-01

    In September, 2010 a comprehensive series of instrumental observations was carried out at Lone Star Geyser in Yellowstone National Park to measure changes in the geyser and its surroundings during eruptions. That project included measurements of flow in the streams that drain the geyser area. Three small streams convey liquid water from the geyser and many of the surrounding hot springs to the Firehole River, about 75 m south of the geyser cone. We developed rating curves for two of these streams by measuring channel cross-sections and timing floating markers (using stopwatches and video recordings) while simultaneously recording stream depth at two-second intervals at two locations using pressure transducers and dataloggers. We estimated the flow in the third (ungaged) stream to be 0.15 of the flow in the easternmost stream, with which it shares a source area and part of its channel. The eruption cycle takes about 3 hours, and a total of nine eruption cycles were observed. During these 3-hour cycles the geyser and the nearby hot springs deliver a total of between 15 and 28 m3 of water to the Firehole River. During the 10-20 minutes of the main phase of an eruption, the geyser delivered between 8 and 11 m3 of water to the three streams. The volume of water emitted during eruptions appears to display a significant diurnal variation which strongly correlates with air temperature, with significantly more flow during early afternoon hours. There were also significant variations in the distribution of flow between the different channels. Our calculations suggest that losses due to evaporation along the flow channels are negligible, and losses due to infiltration appear to be small. The calculated volumes of water discharge do not account for the volume of erupted steam or evaporation of liquid water from the jet. Steam discharge will be assessed using image analysis of high speed video. The calculated volumes provide accurate and important constraint for models of

  17. 78 FR 19628 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2013-04-02

    ... Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of proposed... Electric Company (GE) GE90-76B, -85B, -90B, -94B, - 110B1, and -115B turbofan engines. This proposed AD was... of stage 1 HPT stator shroud distress resulting in engine removals on airplanes with GE90 turbofan...

  18. 76 FR 44323 - National Grid Transmission Services Corporation; Bangor Hydro Electric Company; Notice of...

    Science.gov (United States)

    2011-07-25

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL11-49-000] National Grid Transmission Services Corporation; Bangor Hydro Electric Company; Notice of Petition for Declaratory Order Take..., 18 CFR 385.207, National Grid Transmission Services Corporation and Bangor Hydro Electric Company...

  19. 75 FR 54618 - CAlifornians for Renewable Energy, Inc. (CARE) v. Pacific Gas and Electric Company, Southern...

    Science.gov (United States)

    2010-09-08

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL10-84-000] CAlifornians for Renewable Energy, Inc. (CARE) v. Pacific Gas and Electric Company, Southern California Edison Company, San Diego Gas & Electric Company, California Public Utilities Commission; Notice of Complaint...

  20. 75 FR 66744 - Californians for Renewable Energy, Inc. (CARE) v. Pacific Gas and Electric Company, Southern...

    Science.gov (United States)

    2010-10-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL10-84-001] Californians for Renewable Energy, Inc. (CARE) v. Pacific Gas and Electric Company, Southern California Edison Company, San Diego Gas & Electric Company, California Public Utilities Commission; Notice of Amended...

  1. 76 FR 69713 - Application To Export Electric Energy; BP Energy Company

    Science.gov (United States)

    2011-11-09

    ... DEPARTMENT OF ENERGY [OE Docket No. EA-314-A] Application To Export Electric Energy; BP Energy.... SUMMARY: BP Energy Company (BP Energy) has applied to renew its authority to transmit electric energy from... electric energy from the United States to Mexico as a power marketer for a five-year term using existing...

  2. 76 FR 69712 - Application To Export Electric Energy; BP Energy Company

    Science.gov (United States)

    2011-11-09

    ... DEPARTMENT OF ENERGY [OE Docket No. EA-315-A] Application To Export Electric Energy; BP Energy.... SUMMARY: BP Energy Company (BP Energy) has applied to renew its authority to transmit electric energy from... BP Energy to transmit electric energy from the United States to Canada as a power marketer for a five...

  3. The Geysers-Clear Lake geothermal area, California - an updated geophysical perspective of heat sources

    Science.gov (United States)

    Stanley, W.D.; Blakely, R.J.

    1995-01-01

    The Geysers-Clear Lake geothermal area encompasses a large dry-steam production area in The Geysers field and a documented high-temperature, high-pressure, water-dominated system in the area largely south of Clear Lake, which has not been developed. An updated view is presented of the geological/geophysical complexities of the crust in this region in order to address key unanswered questions about the heat source and tectonics. Forward modeling, multidimensional inversions, and ideal body analysis of the gravity data, new electromagnetic sounding models, and arguments made from other geophysical data sets suggest that many of the geophysical anomalies have significant contributions from rock property and physical state variations in the upper 7 km and not from "magma' at greater depths. Regional tectonic and magmatic processes are analyzed to develop an updated scenario for pluton emplacement that differs substantially from earlier interpretations. In addition, a rationale is outlined for future exploration for geothermal resources in The Geysers-Clear Lake area. -from Authors

  4. 78 FR 44899 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2013-07-25

    ... Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of proposed... Electric Company (GE) GE90-110B1 and -115B turbofan engines. This proposed AD was prompted by multiple...) 2165M22P01, installed on GE90-110B1 and -115B turbofan engines. One of the leaks led to an under cowl engine...

  5. Explaining the inefficiency of electrical distribution companies. Peruvian firms

    Energy Technology Data Exchange (ETDEWEB)

    Perez-Reyes, Raul [Organismo Supervisor de la Inversion en Energia y Mineria, OSINERGMIN (Peru); Tovar, Beatriz [Infrastructure and Transport Research Group (EIT), Department of Applied Economics, University of Palmas de Gran Canaria (Spain)

    2010-09-15

    This paper investigates the extent to which the structural reform of the Peruvian electricity market, implemented in the 1990s, has improved the efficiency of the distribution companies; and it evaluates the influence on efficiency of firm specific explanatory variables. To do this, we rely on data from 14 distribution companies between 1996 and 2006. The results indicate that the incentives generated by the reform process led to the firms becoming more efficient. Moreover, the time trend and private management of the distribution companies are variables that positively affect the levels of efficiency, whereas the lower network densities are then the greater the inefficiency. (author)

  6. Explaining the inefficiency of electrical distribution companies. Peruvian firms

    International Nuclear Information System (INIS)

    Perez-Reyes, Raul; Tovar, Beatriz

    2010-01-01

    This paper investigates the extent to which the structural reform of the Peruvian electricity market, implemented in the 1990s, has improved the efficiency of the distribution companies; and it evaluates the influence on efficiency of firm specific explanatory variables. To do this, we rely on data from 14 distribution companies between 1996 and 2006. The results indicate that the incentives generated by the reform process led to the firms becoming more efficient. Moreover, the time trend and private management of the distribution companies are variables that positively affect the levels of efficiency, whereas the lower network densities are then the greater the inefficiency. (author)

  7. Forecasted electric power demands for the Baltimore Gas and Electric Company. Volume 1 and Volume 2. Documentation manual

    International Nuclear Information System (INIS)

    Estomin, S.L.; Beach, J.E.; Goldsmith, J.V.

    1991-05-01

    The two-volume report presents the results of an econometric forecast of peak load and electric power demand for the Baltimore Gas and Electric Company (BG ampersand E) through the year 2009. Separate energy sales models were estimated for residential sales in Baltimore City, residential sales in the BG ampersand E service area excluding Baltimore City, commercial sales, industrial sales, streetlighting sales, and Company use plus losses. Econometric equations were also estimated for electric space heating and air conditioning saturation in Baltimore City and in the remainder of the BG ampersand E service territory. In addition to the energy sales models and the electric space conditioning saturation models, econometric models of summer and winter peak demand on the BG ampersand E system were estimated

  8. Partitioning geochemistry of arsenic and antimony, El Tatio Geyser Field, Chile

    Energy Technology Data Exchange (ETDEWEB)

    Landrum, J.T. [Department of Geological Sciences, The University of Texas, Austin, TX 78759 (United States); Bennett, P.C., E-mail: pbennett@mail.utexas.edu [Department of Geological Sciences, University of Texas, Austin, TX 78759 (United States); Engel, A.S. [Department of Geology and Geophysics, Louisiana State University, Baton Rouge, LA 70803 (United States); Alsina, M.A.; Pasten, P.A. [Departamento de Ingenieria Hidraulica y Ambiental, Pontificia Universidad Catolica de Chile, Santiago (Chile); Milliken, K. [Department of Geological Sciences, University of Texas, Austin, TX 78759 (United States)

    2009-04-15

    The abundance of As and Sb in aqueous, mineral and biological reservoirs was examined at El Tatio Geyser Field, a unique hydrothermal basin located in the Atacama Desert region of Chile. Here the concentration of total As and Sb in hydrothermal springs and discharge streams are the highest reported for a natural surface water, and the geyser basin represents a significant source of toxic elements for downstream users across Region II, Chile. The geyser waters are near neutral Na:Cl type with {approx}0.45 and 0.021 mmol L{sup -1} total As and Sb, respectively, primarily in the reduced (III) redox state at the discharge with progressive oxidation downstream. The ferric oxyhydroxides associated with the microbial mats and some mineral precipitates accumulate substantial As that was identified as arsenate by XAS analysis (>10 wt% in the mats). This As is easily mobilized by anion exchange or mild dissolution of the HFO, and the ubiquitous microbial mats represent a significant reservoir of As in this system. Antimony, in contrast, is not associated with the mineral ferric oxides or the biomats, but is substantially enriched in the silica matrix of the geyserite precipitates, up to 2 wt% as Sb{sub 2}O{sub 3}. Understanding the mobility and partitioning behavior of these metalloids is critical for understanding their eventual impact on regional water management.

  9. MOSCAB. A geyser-concept bubble chamber to be used in a dark matter search

    Energy Technology Data Exchange (ETDEWEB)

    Antonicci, A.; Bertoni, R.; Mazza, R. [INFN, Sezione di Milano-Bicocca, Milan (Italy); Ardid, M. [Universitat Politecnica de Valencia Camino de Vera, Valencia (Spain); Bruno, G. [LNGS, INFN, Assergi (L' Aquila) (Italy); Burgio, N.; Santagata, A. [ENEA, Centro Ricerche Casaccia, Rome (Italy); Caruso, G.; Frullini, M.; Ricci, E. [Sapienza Universita di Roma, DIAEE, Rome (Italy); Cattaneo, D. [Universita di Milano-Bicocca, Dipt. di Informatica Sistemistica e Comunicazione, Milan (Italy); Chignoli, F.; Clemenza, M.; Lucchini, G.; Pullia, A.; Zanotti, L. [INFN, Sezione di Milano-Bicocca, Milan (Italy); Universita di Milano-Bicocca, Dipt. di Fisica, Milan (Italy); Corcione, M.; Quintino, A. [Sapienza Universita di Roma, DIAEE, Rome (Italy); INFN, Sezione di Roma La Sapienza, Rome (Italy); Cretara, L. [Sapienza Universita di Roma, DIAEE, Rome (Italy); Cundy, D. [Universita di Milano-Bicocca, Dipt. di Fisica, Milan (Italy); CERN, Geneva (Switzerland); Felis, I. [Universitat Politecnica de Valencia Camino de Vera, Valencia (Spain); Fulgione, W. [LNGS, INFN, Assergi (L' Aquila) (Italy); INAF, Osservatorio Astrofisico di Torino, Turin, Pino Torinese (Italy); Manara, L. [INFN, Sezione di Milano-Bicocca, Milan (Italy); Universita di Milano-Bicocca, Dipt. di Fisica, Milan (Italy); Maspero, M. [INFN, Sezione di Milano-Bicocca, Milan (Italy); Universita di Milano-Bicocca, DISAT, Milan (Italy); Papagni, A. [INFN, Sezione di Milano-Bicocca, Milan (Italy); Universita di Milano-Bicocca, Dipt. di Scienza dei Materiali, Milan (Italy); Perego, M. [INFN, Sezione di Milano-Bicocca, Milan (Italy); LNGS, INFN, Assergi (L' Aquila) (Italy); Podviyanuk, R. [LNGS, INFN, Assergi (L' Aquila) (Italy); Redaelli, N. [INFN, Sezione di Milano-Bicocca, Milan (Italy); Sorrenti, D. [INFN, Sezione di Milano-Bicocca, Milan (Italy); Universita di Milano-Bicocca, Dipt. di Informatica Sistemistica e Comunicazione, Milan (Italy); Collaboration: The MOSCAB Collaboration

    2017-11-15

    The MOSCAB experiment (Materia OSCura A Bolle) uses the ''geyser technique'', a variant of the superheated liquid technique of extreme simplicity. Operating principles of the new dark matter detector and technical solutions of the device are reported in detail. First results obtained in a series of test runs taken in laboratory demonstrate that we have successfully built and tested a geyser-concept bubble chamber that can be used in particle physics, especially in dark matter searches, and that we are ready to move underground for extensive data taking. (orig.)

  10. 75 FR 30021 - South Carolina Electric and Gas Company; Saluda Hydroelectric Project; Notice of Teleconference...

    Science.gov (United States)

    2010-05-28

    ... Electric and Gas Company; Saluda Hydroelectric Project; Notice of Teleconference With the National Marine... from Federal Energy Regulatory Commission (FERC) Headquarters, commencing at 2 p.m. (Eastern Standard... Project. The South Carolina Electric and Gas Company will also participate in the teleconference. All...

  11. Memorial 1997 - ENDESA (Chilean Electricity Company); ENDESA - Memoria 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-12-31

    This report provides a comprehensive survey, in depth assessment of the activities overview of ENDESA, Chilean Electricity Company, highlighting economical information and including historical and technical aspects. Economics is its focal point, but other relevant data are shown, like technical data on hydroelectric and thermoelectric power plants. Main activities developed by ENDESA are described, such in Chile as in the foreign. Data on power generation, transmission and transport are also presented and an economical balance of each colligated company are done and analysed 35 figs., 115 tabs.

  12. Plan 2000. The electricity companies plan for electricity conservation in the millennium; Plan 2000. Elselskabernes plan for elbesparelser i det nye aartusinde

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-12-01

    Plan 2000 presents an account of the activities in the years 1997 and 1998 and a budget for the year 2000 and forwards. The report includes all 82 electricity companies in Denmark. Furthermore a number of particular analyses of relevance to electricity conservation are presented. All electricity companies work to promote electricity conservation. All consumption sizes and sections are covered. The activities in the individual companies are supported by a number of common campaigns. In Plan 2000 those activities are presented and the economics is analysed. The activities in the first year of the plan are expected to result in conservation corresponding 4% of the present electricity consumption. 80% of the conservation comes from activities, which are measurable. Technical counselling of trade customers is one of the essential activities. Others are e.g. telephone counselling, theme arrangements and teaching of pupils. (EHS)

  13. Wyle Prof H G Viljoen | Geyser | HTS Teologiese Studies ...

    African Journals Online (AJOL)

    HTS Teologiese Studies / Theological Studies. Journal Home · ABOUT · Advanced Search · Current Issue · Archives · Journal Home > Vol 9, No 2 (1953) >. Log in or Register to get access to full text downloads. Username, Password, Remember me, or Register. Wyle Prof H G Viljoen. A S Geyser. Abstract. No Abstract ...

  14. Monitoring and Characterizing the Geysering and Seismic Activity at the Lusi Mud Eruption Site, East Java, Indonesia

    Science.gov (United States)

    Karyono, Karyono; Obermann, Anne; Mazzini, Adriano; Lupi, Matteo; Syafri, Ildrem; Abdurrokhim, Abdurrokhim; Masturyono, Masturyono; Hadi, Soffian

    2016-04-01

    The Lusi eruption began on May 29, 2006 in the northeast of Java Island, Indonesia, and to date is still active. Lusi is a newborn sedimentary-hosted hydrothermal system characterized by continuous expulsion of liquefied mud and breccias and geysering activity. Lusi is located upon the Watukosek fault system, a left lateral wrench system connecting the volcanic arc and the bakarc basin. This fault system is still periodically reactivated as shown by field data. In the framework of the Lusi Lab project (ERC grant n° 308126) we conducted several types of monitoring. Based on camera observations, we characterized the Lusi erupting activity by four main behaviors occurring cyclically: (1) Regular activity, which consists in the constant emission of water and mud breccias (i.e. viscous mud containing clay, silt, sand and clasts) associated with the constant expulsion of gas (mainly aqueous vapor with minor amounts of CO2 and CH4) (2) Geysering phase with intense bubbling, consisting in reduced vapor emission and more powerful bursting events that do not seem to have a regular pattern. (3) Geysering phase with intense vapor and degassing discharge and a typically dense plume that propagates up to 100 m height. (4) Quiescent phase marking the end of the geysering activity (and the observed cycle) with no gas emissions or bursts observed. To investigate the possible seismic activity beneath Lusi and the mechanisms controlling the Lusi pulsating behaviour, we deployed a network of 5 seismic stations and a HD camera around the Lusi crater. We characterize the observed types of seismic activity as tremor and volcano-tectonic events. Lusi tremor events occur in 5-10 Hz frequency band, while volcano tectonic events are abundant in the high frequencies range from 5 Hz until 25 Hz. We coupled the seismic monitoring with the images collected with the HD camera to study the correlation between the seismic tremor and the different phases of the geysering activity. Key words: Lusi

  15. Sale of electric energy: the case of Electric Power Company of Santa Catarina State (CELESC)

    International Nuclear Information System (INIS)

    Aurich, D.S.

    1990-01-01

    An electric power system assuring the electric supply to the investor client was developed by CELESC, linking the sale resources to one generation construction. It was related the cost of enlargement work from Pery plant, with the participation of Manville Forest Products in the investments. The economic aspects of this contract are presented, including the supply assure, the costs and the advantage each company will receive. (C.G.C.)

  16. 77 FR 7211 - Pacific Gas and Electric Company, Diablo Canyon Independent Spent Fuel Storage Installation...

    Science.gov (United States)

    2012-02-10

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 72-26; NRC-2011-0110] Pacific Gas and Electric Company...) issued NRC Materials License No. SNM-2511 to the Pacific Gas and Electric Company (PG&E) for the Diablo.... 5. TS 3.1.2, ``Spent Fuel Storage Cask (SFSC) Heat Removal System,''--revise to allow the HI-STORM...

  17. Management report 2001 of COPEL - Electrical Company of Parana State, Brazil

    International Nuclear Information System (INIS)

    Anon

    2000-01-01

    The COPEL - Electrical Company of Parana State, Brazil - management report of calendar year of 2000 is presented, covering the following topics: COPEL - standing for much more than energy; extending the benefits of electricity to everyone in Parana state, Brazil; protecting and recovering the environment; philanthropy and volunteer work; education; social integration; support to cultural expression and gratitude

  18. Resource, technology, and environment at the geysers

    Energy Technology Data Exchange (ETDEWEB)

    Weres, O.; Tsao, K.; Wood, B.

    1977-06-01

    A general review, description, and history of geothermal development at the Geysers is presented. Particular emphasis is placed on environmental impacts of development of the area. The discussion is presented under the following chapter titles: introduction; energy, enthalpy and the First Law; vapor-producing geothermal reservoirs--review and models; geothermal; entropy and the Second Law; power plants--basics; H/sub 2/S emissions; hydrogen sulfide--possible health effects and odor; other emissions; power plant hydrogen sulfide abatement; hot water based geothermal development; phytotoxicity of geothermal emissions; appendices; and bibliography. (JGB)

  19. Measuring efficiency and productivity change (PTF) in the Peruvian electricity distribution companies after reforms

    Energy Technology Data Exchange (ETDEWEB)

    Perez-Reyes, Raul [Organismo Supervisor de la Inversion en Energia y Mineria, Osinergmin (Peru); Tovar, Beatriz [Infrastructure and Transport Research Group (EIT), Department of Applied Economics, University of Palmas de Gran Canaria (Spain)

    2009-06-15

    This paper analyzes the evolution of productivity of the electricity distribution companies in Peru, to assess whether reforms have improved the efficiency in this sector. The paper also identifies potential sources of productivity changes, based on market restructuring the electricity sector and changes in property. To do this, we rely on a set of data for 14 distribution companies, for the period 1996-2006. Our analysis suggests that improvements in the efficiency and productivity of electricity distribution in Peru have occurred, and that there is a relationship between the restructuring of distribution sector and the enhancement of productivity. (author)

  20. Measuring efficiency and productivity change (PTF) in the Peruvian electricity distribution companies after reforms

    International Nuclear Information System (INIS)

    Perez-Reyes, Raul; Tovar, Beatriz

    2009-01-01

    This paper analyzes the evolution of productivity of the electricity distribution companies in Peru, to assess whether reforms have improved the efficiency in this sector. The paper also identifies potential sources of productivity changes, based on market restructuring the electricity sector and changes in property. To do this, we rely on a set of data for 14 distribution companies, for the period 1996-2006. Our analysis suggests that improvements in the efficiency and productivity of electricity distribution in Peru have occurred, and that there is a relationship between the restructuring of distribution sector and the enhancement of productivity. (author)

  1. 76 FR 35208 - Pacific Gas and Electric Company; Nevada Irrigation District; Notice of Environmental Site Review

    Science.gov (United States)

    2011-06-16

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [ Project No. 2310-193--California; Project No. 2266-102--California] Pacific Gas and Electric Company; Nevada Irrigation District; Notice of Environmental Site Review On July 6-8, 2011, the Federal Energy Regulatory Commission (Commission) staff and the Pacific Gas and Electric Company ...

  2. The development strategies of the european electric power companies

    International Nuclear Information System (INIS)

    Heddebaud, D.

    2005-01-01

    This study takes stock on the european market of the electric power and of its development perspectives. It details the strategy and the place of the main operators and shows their forces and weaknesses. It provides a comparison of the financial performances of 28 companies (growth, margins, profitability, debt and war chest). (A.L.B.)

  3. Local population impacts of geothermal energy development in the Geysers: Calistoga region

    Energy Technology Data Exchange (ETDEWEB)

    Haven, K.F.; Berg, V.; Ladson, Y.W.

    1980-09-01

    The country-level population increase implications of two long-term geothermal development scenarios for the Geysers region in California are addressed. This region is defined to include the counties of Lake, Sonoma, Mendocino and Napa, all four in northern California. The development scenarios include two components: development for electrical energy production and direct use applications. Electrical production scenarios are derived by incorporating current development patterns into previous development scenarios by both industry and research organizations. The scenarios are made county-specific, specific to the type of geothermal system constructed, and are projected through the year 2000. Separate high growth rate and low growth rate scenarios are developed, based on a set of specified assumptions. Direct use scenarios are estimated from the nature of the available resource, existing local economic and demographic patterns, and available experience with various separate direct use options. From the composite development scenarios, required numbers of direct and indirect employees and the resultant in-migration patterns are estimated. In-migration patterns are compared to current county level population and ongoing trends in the county population change for each of the four counties. From this comparison, conclusions are drawn concerning the contributions of geothermal resource development to future population levels and the significance of geothermally induced population increase from a county planning perspective.

  4. Southeast Regional Wastewater Treatment Plant Facilities Improvements Project and Geysers Effluent Pipeline Project. Draft EIR/EIS: Executive summary

    International Nuclear Information System (INIS)

    1994-01-01

    The Southeast Regional Wastewater Treatment Plant (SERWTP) Facilities Improvement Plan and Geysers Effluent Pipeline and Effluent Injection Project are proposed as a plan to provide expanded wastewater treatment capabilities and to dispose of the effluent by injection in The Geysers geothermal field for purposes of power production. The project is located predominantly in the County of Lake, California, and also in part of Sonoma County. The plan includes various conventional facilities improvements in wastewater treatment to a secondary level of treatment at the SWERWTP. The plan includes facilities to convey the treated effluent in a 26-mile, 24-inch inside diameter pipeline to the Southeast Geysers. The wastewater from the SERWTP would be supplemented by raw lake water diverted from nearby Clear Lake. At The Geysers, the effluent would be directed into a system of distribution lines to wells. In the geothermal reservoir, the water will be converted to steam and collected in production wells that will direct the steam to six existing power plants. This document is a summary of a combined full Environmental Impact Report (EIR) and Environmental Impact Statement (EIS). The EIR/EIS describes the environmental impacts of the various components of the project. Mitigation measures are suggested for reducing impacts to a less than significant level

  5. Job safety and awareness analysis of safety implementation among electrical workers in airport service company

    Directory of Open Access Journals (Sweden)

    Putra Perdana Suteja

    2018-01-01

    Full Text Available Electrical is a fundamental process in the company that has high risk and responsibility especially in public service company such as an airport. Hence, the company that operates activities in the airport has to identify and control the safety activities of workers. On the safety implementation, the lack of workers’ awareness is fundamental aspects to the safety failure. Therefore, this study aimed to analyse the safety awareness and identify risk in the electrical workplace. Safety awareness questionnaires are distributed to ten workers in order to analyse their awareness. Job safety analysis method used to identify the risk in the electrical workplace. The preliminary study stated that workers were not aware of personal protective equipment usage so that the awareness and behavioural need to be analysed. The result is the hazard was found such as electrical shock and noise for various intensity in the workplace. While electrical workers were aware of safety implementation but less of safety behaviour. Furthermore, the recommendation can be implemented are the implementation of behaviour-based safety (BBS, 5S implementation and accident report list.

  6. Own power: Motives of having electricity without the energy company

    International Nuclear Information System (INIS)

    Leenheer, Jorna; Nooij, Michiel de; Sheikh, Omer

    2011-01-01

    New technologies will enable households to generate an increasing amount of their own electricity. Intentions to generate own power are a preliminary step towards actual behavior. Because own generation is still very limited and the behavior of early adopters may not be representative for the complete population, our study focuses on intentions rather than actual behavior. A consumer survey among 2047 Dutch households reveals that environmental concerns are the most important driver of a household's intention to generate its own power. Affinity with technology and energy and the reputation of electricity companies are also significant drivers, but financial factors and power outages are not. About 40% of Dutch households have an intention to generate their own power, with an overrepresentation of young households. This group falls apart in two sub segments; for the 'generating savers' (21%) a high intention to generate own power coincides with a high intention to save energy, whereas generating users (18%) combine a high intention to generate own power with a low intention to save energy. - Highlights: → A consumer survey studies household intentions to generate own power. → Environmental concerns are the most important motive for generating own power. → Other drivers are affinity with technology and reputation of electricity companies. → About 40% of Dutch households feel a need to generate their own electricity.

  7. Determining the in situ water content of the Geysers Graywacke of Northern California

    Energy Technology Data Exchange (ETDEWEB)

    Marsh, A.

    1994-12-01

    The water content, porosity and permeability measurements of the Northern California Geysers rocks are used to predict the lifetime of the geothermal resource, which provides 10% of Northern California`s electricity. The Geysers rock was drilled from defunct well SB-15-D, and some cores wee sealed in aluminum tubes to preserve the in situ water content. These cores were sent to the Lawrence Livermore Laboratory to measure the water content. Humidity measurements were taken of the air around a one and a half foot encased core, recovered from a depth of 918.9 feet. Over a seven day period, the humidity reached almost 100% indicating that the air around the core was saturated in water vapor. We believe the sealing method is effective, preserving the in-situ water content. To measure water content, I will use Archimede`s principle to determine the density of the core before and after drying in an oven. Ultrasonic measurements will be taken of the core upon removal from aluminum tube to determine the change of p-wave velocity with change in water content. Water in the pores increases the effective compressibility of the rock therefore increasing the p-velocity. The measured p-wave velocities can then be used in the field to determine in-situ water content. Three dimensional x-ray images will be used to determine the deviations from average density within individual cores. Since the density depends on water content as well as mineralogy, images can show the location of pore fluid and drilling mud. Archimede`s principle, humidity detection, ultrasonics and x-ray scanning are viable methods to measure the in-situ water content and pore water distribution in the graywacke.

  8. Robust DEA under discrete uncertain data: a case study of Iranian electricity distribution companies

    Science.gov (United States)

    Hafezalkotob, Ashkan; Haji-Sami, Elham; Omrani, Hashem

    2015-06-01

    Crisp input and output data are fundamentally indispensable in traditional data envelopment analysis (DEA). However, the real-world problems often deal with imprecise or ambiguous data. In this paper, we propose a novel robust data envelopment model (RDEA) to investigate the efficiencies of decision-making units (DMU) when there are discrete uncertain input and output data. The method is based upon the discrete robust optimization approaches proposed by Mulvey et al. (1995) that utilizes probable scenarios to capture the effect of ambiguous data in the case study. Our primary concern in this research is evaluating electricity distribution companies under uncertainty about input/output data. To illustrate the ability of proposed model, a numerical example of 38 Iranian electricity distribution companies is investigated. There are a large amount ambiguous data about these companies. Some electricity distribution companies may not report clear and real statistics to the government. Thus, it is needed to utilize a prominent approach to deal with this uncertainty. The results reveal that the RDEA model is suitable and reliable for target setting based on decision makers (DM's) preferences when there are uncertain input/output data.

  9. Social balance sheet 2000 of COPEL - Electrical Company of Parana State, Brazil

    International Nuclear Information System (INIS)

    Anon

    2000-01-01

    The COPEL - Electrical Company of Parana State, Brazil social balance report of calendar year of 2000 is presented, covering the following topics: COPEL - standing for much more than energy; extending the benefits of electricity to everyone in Parana state, Brazil; protecting and recovering the environment; philanthropy and volunteer work; education; social integration; support to cultural expression and gratitude

  10. How the geysers, tidal stresses, and thermal emission across the south polar terrain of enceladus are related

    International Nuclear Information System (INIS)

    Porco, Carolyn; DiNino, Daiana; Nimmo, Francis

    2014-01-01

    We present the first comprehensive examination of the geysering, tidal stresses, and anomalous thermal emission across the south pole of Enceladus and discuss the implications for the moon's thermal history and interior structure. A 6.5 yr survey of the moon's south polar terrain (SPT) by the Cassini imaging experiment has located ∼100 jets or geysers erupting from four prominent fractures crossing the region. Comparing these results with predictions of diurnally varying tidal stresses and with Cassini low resolution thermal maps shows that all three phenomena are spatially correlated. The coincidence of individual jets with very small (∼10 m) hot spots detected in high resolution Cassini VIMS data strongly suggests that the heat accompanying the geysers is not produced by shearing in the upper brittle layer but rather is transported, in the form of latent heat, from a sub-ice-shell sea of liquid water, with vapor condensing on the near-surface walls of the fractures. Normal stresses modulate the geysering activity, as shown in the accompanying paper; we demonstrate here they are capable of opening water-filled cracks all the way down to the sea. If Enceladus' eccentricity and heat production are in steady state today, the currently erupting material and anomalous heat must have been produced in an earlier epoch. If regional tidal heating is occurring today, it may be responsible for some of the erupting water and heat. Future Cassini observations may settle the question.

  11. Low-Q structure beneath The Geysers area in the northern California

    Science.gov (United States)

    Matsubara, M.

    2010-12-01

    A large reservoir is located beneath The Geysers geothermal area, northern California. Seismic tomography revealed high-velocity (high-V) and low-Vp/Vs zones in the reservoir (Julian et al., 1996) and a decrease of Vp/Vs from 1991 to 1998 (Guasekera et al., 2003) due to withdrawal of steam from the reservoir. I build on these earlier studies by performing the attenuation tomography in this region to investigate the Q structure. The target region, 38.5-39.0°N and 122.5-123°W, covers The Geysers area. I use seismographs of Northern California Earthquake Data Center, which recorded 1235 earthquakes with magnitude larger than 2.0 and resolved focal mechanisms from 2002 to 2008. The band-pass filtered seismographs are analyzed for collecting the maximum amplitude data. Three kinds of Butterworth band-pass filters, such as 1-3, 3-7, and 7-15, correspond to the analysis of the Q structure for 2, 5, and 10 Hz, respectively. I use the P- and S-wave maximum amplitudes between the two seconds after the arrival of those waves in order to avoid the effects by coda. A total of 8980 P- and 1086 S-wave amplitude data for 949 earthquakes recorded at 48 stations are available for the analysis using the attenuation tomographic method (Zao et al., 1996). Extremely low-Qp and Qs zones are found at the northwestern (NW) of The Geysers area at sea level. These zones are consistent with the high-Vp and Vs and low-Vp/Vs zones located at the NW part of the reservoir. The low-Qs zone extends to the southeast (SE) and with approximately 15 km length and 5 km width and has another negative peak beneath the SE part of the reservoir. This low-Qs zone is also consistent with the high-Vp and Vs regions of the reservoir characterized by a low-Vp/Vs zone. However, Qp in the SE part is slightly high. Below sea level in The Geysers reservoir, there are a main greywacke layer and a felsite layer. Above sea level, there is a greenstone melange beneath the NW extremely low-Qp and Qs region and a

  12. Magnitude and Rupture Area Scaling Relationships of Seismicity at The Northwest Geysers EGS Demonstration Project

    Science.gov (United States)

    Dreger, D. S.; Boyd, O. S.; Taira, T.; Gritto, R.

    2017-12-01

    Enhanced Geothermal System (EGS) resource development requires knowledge of subsurface physical parameters to quantify the evolution of fracture networks. Spatio-temporal source properties, including source dimension, rupture area, slip, rupture speed, and slip velocity of induced seismicity are of interest at The Geysers geothermal field, northern California to map the coseismic facture density of the EGS swarm. In this investigation we extend our previous finite-source analysis of selected M>4 earthquakes to examine source properties of smaller magnitude seismicity located in the Northwest Geysers Enhanced Geothermal System (EGS) demonstration project. Moment rate time histories of the source are found using empirical Green's function (eGf) deconvolution using the method of Mori (1993) as implemented by Dreger et al. (2007). The moment rate functions (MRFs) from data recorded using the Lawrence Berkeley National Laboratory (LBNL) short-period geophone network are inverted for finite-source parameters including the spatial distribution of fault slip, rupture velocity, and the orientation of the causative fault plane. The results show complexity in the MRF for the studied earthquakes. Thus far the estimated rupture area and the magnitude-area trend of the smaller magnitude Geysers seismicity is found to agree with the empirical relationships of Wells and Coppersmith (1994) and Leonard (2010), which were developed for much larger M>5.5 earthquakes worldwide indicating self-similar behavior extending to M2 earthquakes. We will present finite-source inversion results of the micro-earthquakes, attempting to extend the analysis to sub Mw, and demonstrate their magnitude-area scaling. The extension of the scaling laws will then enable the mapping of coseismic fracture density of the EGS swarm in the Northwest Geysers based on catalog moment magnitude estimates.

  13. Eruptions at Lone Star Geyser, Yellowstone National Park, USA, part 1: energetics and eruption dynamics

    Science.gov (United States)

    Karlstrom, Leif; Hurwitz, Shaul; Sohn, Robert; Vandemeulebrouck, Jean; Murphy, Fred; Rudolph, Maxwell L.; Johnston, Malcolm J.S.; Manga, Michael; McCleskey, R. Blaine

    2013-01-01

    Geysers provide a natural laboratory to study multiphase eruptive processes. We present results from a four–day experiment at Lone Star Geyser in Yellowstone National Park, USA. We simultaneously measured water discharge, acoustic emissions, infraredintensity, and visible and infrared video to quantify the energetics and dynamics of eruptions, occurring approximately every three hours. We define four phases in the eruption cycle: 1) a 28 ± 3 minute phase with liquid and steam fountaining, with maximum jet velocities of 16–28 m s− 1, steam mass fraction of less than ∼ 0.01. Intermittently choked flow and flow oscillations with periods increasing from 20 to 40 s are coincident with a decrease in jet velocity and an increase of steam fraction; 2) a 26 ± 8 minute post–eruption relaxation phase with no discharge from the vent, infrared (IR) and acoustic power oscillations gliding between 30 and 40 s; 3) a 59 ± 13 minute recharge period during which the geyser is quiescent and progressively refills, and 4) a 69 ± 14 minute pre–play period characterized by a series of 5–10 minute–long pulses of steam, small volumes of liquid water discharge and 50–70 s flow oscillations. The erupted waters ascend froma 160 − 170° C reservoir and the volume discharged during the entire eruptive cycle is 20.8 ± 4.1 m3. Assuming isentropic expansion, we calculate a heat output from the geyser of 1.4–1.5 MW, which is < 0.1% of the total heat output from Yellowstone Caldera.

  14. Do acquisitions by electric utility companies create value? Evidence from deregulated markets

    International Nuclear Information System (INIS)

    Kishimoto, Jo; Goto, Mika; Inoue, Kotaro

    2017-01-01

    In the early 1990s, the United Kingdom (the UK) initiated widespread reforms in the electricity industry through a series of market liberalization policies. Several other countries have subsequently followed the lead and restructured their electricity industry. A major outcome of the deregulation effort is the spate of takeovers, both domestic and global, by electric utility companies. With the entry of new players and increasing competition, the business environment of the electricity industry has changed dramatically. This study analyzes the economic impact of mergers and acquisitions (M&As) in the electric utility industry after deregulation. We have examined acquisitions that took place between 1998 and 2013 in the United States, Canada, the UK, Germany, and France. Although previous studies showed no evidence of a positive effect on acquiring firms through M&As, we find that acquisitions by electric utility companies increased the acquiring firms’ share value and improved their operating performance, primarily through efficiency gains after the deregulation. These results are consistent with the empirical evidence and implications presented by Andrade et al. (2001) that M&A created value for the shareholders of the acquiring and target combined firms. - Highlights: • This study examined mergers and acquisitions (M&A) in electric utility industry. • The sample covered M&A between 1998 and 2013 in North America and Europe. • We found M&A significantly increased acquiring firms’ share value and operating performance. • Deregulation policy realized gains for shareholders without incurring costs for consumers.

  15. Data envelopment analysis with uncertain data: An application for Iranian electricity distribution companies

    International Nuclear Information System (INIS)

    Sadjadi, S.J.; Omrani, H.

    2008-01-01

    This paper presents Data Envelopment Analysis (DEA) model with uncertain data for performance assessment of electricity distribution companies. During the past two decades, DEA has been widely used for benchmarking the electricity distribution companies. However, there is no study among many existing DEA approaches where the uncertainty in data is allowed and, at the same time, the distribution of the random data is permitted to be unknown. The proposed method of this paper develops a new DEA method with the consideration of uncertainty on output parameters. The method is based on the adaptation of recently developed robust optimization approaches proposed by Ben-Tal and Nemirovski [2000. Robust solutions of linear programming problems contaminated with uncertain data. Mathematical Programming 88, 411-421] and Bertsimas et al. [2004. Robust linear optimization under general norms. Operations Research Letters 32, 510-516]. The results are compared with an existing parametric Stochastic Frontier Analysis (SFA) using data from 38 electricity distribution companies in Iran to show the effects of the data uncertainties on the performance of DEA outputs. The results indicate that the robust DEA approach can be a relatively more reliable method for efficiency estimating and ranking strategies

  16. Analysis of tariff levels from electric company in relation to financing request

    International Nuclear Information System (INIS)

    Correa, A.L.S.

    1991-11-01

    The economic-financial model of the Brazilian electric sector is discussed, considering the compatibility of the practiced tariff levels to the demand of consumption market and the production and operation costs. Some institutional actions are identified as solutions for emergency questions and subsides to the big strategies. The economic-finance indicators are also presented, showing the performance of the electrical companies. (C.G.C.)

  17. 77 FR 58471 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2012-09-21

    ... Airworthiness Directives; General Electric Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA.../P1, GEnx-1B75/P1, GEnx- 2B67, and GEnx-2B67B turbofan engines. This AD requires initial and... this AD will affect 11 GE GEnx turbofan engines installed on airplanes of U.S. registry. We also...

  18. Real-time Remote Data Online For Norris Geyser Basin in Yellowstone National Park

    Science.gov (United States)

    Perry, J. E.; Lowenstern, J. B.; Clor, L.; Cervelli, P. F.; Allen, S. T.; Heasler, H.; Moloney, T.

    2010-12-01

    Perry, John, Lowenstern, Jacob, Cervelli, Peter, Clor, Laura, Heasler, Henry, Allen, Scott, Moloney, Tim During June 2010, ten 900MHz wireless temperature data loggers (nodes) were installed around the Norris Geyser Basin to monitor geothermal features, streams and soil temperatures. The loggers can provide near real-time updates on temperature variations within 0.2 deg C due to hydrothermal discharges or subsurface fluid migration. Each sensor node is programmed to measure the temperature every two minutes and automatically upload data to the base station computer daily. The hardware consists of a waterproof case containing an M5 logger (made by Marathon Products, Inc.®) with internal memory, lithium D-cell batteries and a 900 MHz, 1-W-transceiver and 5 meter long Teflon-coated probe with a thermistor sensor. Tethered stub or panel antennas are oriented to optimize signal strength to the base station near the Norris Museum. A 0.61 meter-long base-station antenna located 10m high provides signal to the furthest node over 850 meters away with most being “line-of-sight”. A 20-meter coaxial cable and lightning grounding wire connects the base-station antenna to an Ethernet-radio connected to the YNP local-area network. A server located 26-km north at Mammoth Hot Springs requests data at regular intervals (normally daily), archives the information, and then sends it to the USGS for further archiving and internet distribution. During periods of unusual hydrothermal behavior, data can be requested as needed, and it is possible to set user-programmable alarm limits for notification. The RF network is designed to monitor changes from three different sub-basins at Norris (Gray Lakes, Steamboat-Echinus and Porcelain Basin), the main Tantalus Creek drainage, and five individual thermal features (Constant, Porkchop, Steamboat and Echinus Geysers, and Opalescent Spring). The logger installed in Nuphar Lake provides ambient temperatures controlled solely by local

  19. Development of an Enhanced Two-Phase Production System at the Geysers Geothermal Field; FINAL

    International Nuclear Information System (INIS)

    Steven Enedy

    2001-01-01

    A method was developed to enhance geothermal steam production from two-phase wells at THE Geysers Geothermal Field. The beneficial result was increased geothermal production that was easily and economically delivered to the power plant

  20. Seismic velocity structure and microearthquake source properties at The Geysers, California, geothermal area

    Energy Technology Data Exchange (ETDEWEB)

    O' Connell, D.R.

    1986-12-01

    The method of progressive hypocenter-velocity inversion has been extended to incorporate S-wave arrival time data and to estimate S-wave velocities in addition to P-wave velocities. S-wave data to progressive inversion does not completely eliminate hypocenter-velocity tradeoffs, but they are substantially reduced. Results of a P and S-wave progressive hypocenter-velocity inversion at The Geysers show that the top of the steam reservoir is clearly defined by a large decrease of V/sub p//V/sub s/ at the condensation zone-production zone contact. The depth interval of maximum steam production coincides with minimum observed V/sub p//V/sub s/, and V/sub p//V/sub s/ increses below the shallow primary production zone suggesting that reservoir rock becomes more fluid saturated. The moment tensor inversion method was applied to three microearthquakes at The Geysers. Estimated principal stress orientations were comparable to those estimated using P-wave firstmotions as constraints. Well constrained principal stress orientations were obtained for one event for which the 17 P-first motions could not distinguish between normal-slip and strike-slip mechanisms. The moment tensor estimates of principal stress orientations were obtained using far fewer stations than required for first-motion focal mechanism solutions. The three focal mechanisms obtained here support the hypothesis that focal mechanisms are a function of depth at The Geysers. Progressive inversion as developed here and the moment tensor inversion method provide a complete approach for determining earthquake locations, P and S-wave velocity structure, and earthquake source mechanisms.

  1. The financial and accounting implications of the privatization of the regional electricity companies in the UK

    International Nuclear Information System (INIS)

    Thomson, L.

    1993-01-01

    This paper reviews some of the financial and accounting implications of the privatization of the electricity distribution and supply sector in England and Wales, specifically the transformation of the Electricity Area Boards into the 12 Regional Electricity Companies (RECs). It considers the factors influencing the setting of post-privatization price control factors; the capital restructuring of the RECs; the valuation placed by the Secretary of State for Energy on each company at flotation, and market reaction to this as shown in subsequent changes in share price; and changes in the information provided in the RECs' accounts over the privatization period. (Author)

  2. Southeast Regional Wastewater Treatment Plant Facilities Improvements Project and Geysers Effluent Pipeline Project. Draft EIR/EIS, Volume 1 of 2

    International Nuclear Information System (INIS)

    1994-01-01

    The primary focus of this environmental analysis is on improvements to the Southeast Regional Wastewater Treatment Plant (SRWTP) facilities and disposal to the Geysers for injection. This analysis will be incorporated with an earlier EIR which evaluated system improvements to the SRWTP and twelve disposal alternatives. In July 1993, the Lake County Sanitation District Board of Directors (LACOSAN) selected the Geysers Effluent Pipeline as the preferred alternative to be analyzed in this EIR/EIS. This environmental analysis will primarily focus on improvements to the SRWTP facilities and a 24 inch pipeline designed to carry up to 5,400 gallons per minute of secondarily treated wastewater. The wastewater will be transported from the Lake County Sanitation District's Southeast Regional Wastewater Treatment Plant, Middletown Wastewater Treatment Plant with additional make-up water from Clear Lake to the Southeast portion of the Geysers Geothermal Field in Lake and Sonoma Counties, California

  3. Geologic research at the Geysers -- 1996

    Energy Technology Data Exchange (ETDEWEB)

    Hulen, J.B.

    1997-12-31

    In response to the onset of field-wide pressure declines at The Geysers geothermal field in northern California the Department of Energy`s Geothermal Division in 1990 inaugurated sponsorship of a dedicated, multiyear research effort designed to mitigate the pressure drop and to allow steamfield operators to make more informed forecasts of steam supply and quality well into the 21st century. EGI and its predecessor, the University of Utah Research Institute, have from the onset been key participants in this important research effort. For example, utilizing fluid-inclusion and stable-isotopic methods, deciphered the field`s intricate magmatic-hydrothermal history. Hulen et al. (1991, 1992) and Hulen and Nielson (1995a) identified major textural and mineralogic differences between the productive steam reservoir and its relatively impermeable caprock.

  4. Assessment and Improving Methods of Reliability Indices in Bakhtar Regional Electricity Company

    Directory of Open Access Journals (Sweden)

    Saeed Shahrezaei

    2013-04-01

    Full Text Available Reliability of a system is the ability of a system to do prospected duties in future and the probability of desirable operation for doing predetermined duties. Power system elements failures data are the main data of reliability assessment in the network. Determining antiseptic parameters is the goal of reliability assessment by using system history data. These parameters help to recognize week points of the system. In other words, the goal of reliability assessment is operation improving and decreasing of the failures and power outages. This paper is developed to assess reliability indices of Bakhtar Regional Electricity Company up to 1393 and the improving methods and their effects on the reliability indices in this network. DIgSILENT Power Factory software is employed for simulation. Simulation results show the positive effect of improving methods in reliability indices of Bakhtar Regional Electricity Company.

  5. Helium isotopes in geothermal systems: Iceland, The Geysers, Raft River and Steamboat Springs

    International Nuclear Information System (INIS)

    Torgersen, T.

    1982-01-01

    Helium isotope ratios have been measured in geothermal fluids from Iceland, The Geysers, Raft River, Steamboat Springs and Hawaii. These ratios have been interpreted in terms of the processes which supply He in distinct isotopic ratios and in terms of the processes which can alter the isotopic ratio. Using this interpretational scheme, Iceland is found to be an area of hot-spot magmatic He implying an active volcanic source although the data are suggestive of high-temperature weathering release of crustal He incorporated in the geothermal fluids. By comparison to fumarolic gases from Hawaii and Juan De Fuca and Cayman Trench basaltic glass samples, The Geysers contains MOR type magmatic He again implying an active volcanic source possibly a 'leaky' transform related to the San Andreas Fault System. Raft River contains only crustal He indicating no active volcanic sources. Steamboat Springs He isotope ratios are distinctly less than typical plate margin volcanics but must still have a magmatic source. (author)

  6. Profiting from competition: Financial tools for electric generation companies

    Science.gov (United States)

    Richter, Charles William, Jr.

    Regulations governing the operation of electric power systems in North America and many other areas of the world are undergoing major changes designed to promote competition. This process of change is often referred to as deregulation. Participants in deregulated electricity systems may find that their profits will greatly benefit from the implementation of successful bidding strategies. While the goal of the regulators may be to create rules which balance reliable power system operation with maximization of the total benefit to society, the goal of generation companies is to maximize their profit, i.e., return to their shareholders. The majority of the research described here is conducted from the point of view of generation companies (GENCOs) wishing to maximize their expected utility function, which is generally comprised of expected profit and risk. Strategies that help a GENCO to maximize its objective function must consider the impact of (and aid in making) operating decisions that may occur within a few seconds to multiple years. The work described here assumes an environment in which energy service companies (ESCOs) buy and GENCOs sell power via double auctions in regional commodity exchanges. Power is transported on wires owned by transmission companies (TRANSCOs) and distribution companies (DISTCOs). The proposed market framework allows participants to trade electrical energy contracts via the spot, futures, options, planning, and swap markets. An important method of studying these proposed markets and the behavior of participating agents is the field of experimental/computational economics. For much of the research reported here, the market simulator developed by Kumar and Sheble and similar simulators has been adapted to allow computerized agents to trade energy. Creating computerized agents that can react as rationally or irrationally as a human trader is a difficult problem for which we have turned to the field of artificial intelligence. Some of our

  7. Electricity company managers' views of environmental issues: Implications for environmental groups and government

    International Nuclear Information System (INIS)

    Fischhoff, Maya E.

    2007-01-01

    The electricity industry's environmental impacts are a matter of acute interest to many outsiders, including government and environmental groups-and they have sought to affect those impacts through regulations, public pressure, and technical assistance. These approaches reflect outsiders' intuitive theories regarding the industry's goals, practices, and capabilities. The research reported here provides a systematic insiders' view on these processes, based on in-depth interviews with 70 middle managers in two electricity companies heavily reliant on coal. It finds managers sincerely committed to environmental action, but often frustrated by confusing regulatory requirements, perceived costs, and other challenges. It identifies ways of enabling middle managers to act on their commitment, with lessons relevant for outside groups and those within companies seeking to effect change

  8. 76 FR 54259 - Virginia Electric and Power Company, Docket Nos. 50-338 and 50-339, North Anna Power Station...

    Science.gov (United States)

    2011-08-31

    ... NUCLEAR REGULATORY COMMISSION [NRC-2011-0185] Virginia Electric and Power Company, Docket Nos. 50.... NPF-4 and NPF-7, issued to Virginia Electric Power Company (the licensee), for operation of the North...) and (d) during declarations of severe weather conditions involving tropical storm or hurricane force...

  9. The Time Variability of Individual Geysers in the Plume of Enceladus

    Science.gov (United States)

    Trumbo, S. K.; Ewald, S. P.; Ingersoll, A. P.

    2016-12-01

    Porco et al. (2014) [1] published the locations of 100 jets along the so-called "tiger stripes" that feed the massive plume of Enceladus. Hedman et al. (2013) [2] observed fluctuations in integrated plume brightness in response to periodic tidal forcing on the orbital timescale of Enceladus, in which the plume is brightest near apocenter and dimmest near pericenter. The thin crack models of Hurford et al. (2007, 2012) [3, 4] suggest that individual jets should respond to the same forces on similar timescales. However, if the jets are produced via vapor and liquid propagation through thin subterranean cracks, then they may also be controlled thermodynamically and dependent on the timescale of ice buildup on the conduit walls. Ingersoll and Ewald (2016) [5] demonstrate that the plume also varies on decadal timescales, perhaps as a result of an eleven-year tide or long-term ice accumulation within source cracks. We examine Cassini ISS Narrow Angle Camera images spanning 2005 - 2012 in order to assess the temporal variability of individual geysers and regional emission in the plume. We observe both the appearance and disappearance of individual jets, as well as visible changes in regional emission. Our observations suggest localized variations on timescales of months to years that are not easily tied to mean anomaly, but that may be indicative of subsurface processes. Theoretical models of the geyser mechanisms and subsurface plumbing predict closure timescales of individual cracks that are dependent on model parameters, such as crack width, crack tortuosity, and water table depth [6, 7, 8]. Thus, we discuss possible implications of these observations for both the mechanism and anatomy of an Enceladus geyser. [1] Porco et al. (2014), AJ, 148, 3. [2] Hedman et al. (2013), Nature, 500, 182 - 184. [3] Hurford et al. (2007), Nature, 447, 292 - 294. [4] Hurford et al. (2012), Icarus, 220, 896 - 903. [5] Ingersoll and Ewald (2016), Icarus, in review. [6] Ingersoll and

  10. Fuel cells and electricity companies - new risk management opportunities

    International Nuclear Information System (INIS)

    Whale, M.

    2004-01-01

    'Full text:' Deregulation, distributed generation, combined heat and power, renewables, fuel cells, hydrogen. Power companies are facing a rapidly evolving environment that is testing their ability to effectively deploy capital and earn profits. While recent deregulation trends have shifted the structure of power markets into separating generators from distributors, the improving economic value proposition offered by smaller scale distributed generation technologies - such as fuel cells - would seem to be a conflicting development. In this complex and changing environment, decisions based on the economic reality of the capital markets are likely to prevail. By examining the opportunity to enhance risk management offered by stationary fuel cells, particularly in CHP applications, we provide a context for the issues being discussed in today's sessions focusing on power companies and electric utilities. Our risk management perspective suggests a pathway for implementing fuel cells in combined heat and power applications that large power generators can introduce in increasingly smaller sizes. With capital costs of fuel cells high and risk tolerance of power companies low, the challenge for smaller technology developers will be to reduce the apparently long time horizon that persists for substantial deployment. (author)

  11. Clean coal technology project to Polk Power Station, Tampa Electric Company, Florida, Volume 1: Report

    International Nuclear Information System (INIS)

    1994-06-01

    Tampa Electric Company proposes to construct and operate a 1,150-MW power station in southwestern Polk County, Florida. The proposed Polk Power Station would require an EPA NPDES permit for a new source and would include a 260-MW IGCC unit as a DOE Clean Coal Technology demonstration project. This EIS document assesses the proposed project and alternatives with respect to environmental impacts. Mitigative measures are also evaluated for the preferred alternative. Included in this Volume I are the following: alternatives including Tampa Electric Companies proposed project (preferred alternative with DOE financial assistance); affected environment; environmental consequences of the alternatives

  12. The diverse strategies of american electricity companies in the face of de-monopolization of the electricity market

    International Nuclear Information System (INIS)

    Finon, D.; Serrato, G.

    2000-01-01

    The electricity boards in the United States of America have adopted new strategies clearly influenced by anterior regulations and by de-monopolization. Numerous mergers are only the most spectacular of these strategies, enabling the start-up handicap of size in face of new competition to be surmounted, and offering the advantage of bringing together the supply of gas and electricity. Two principal means of adaptation for the gas and electricity boards are their development in non-regulated production (equipment sharing, setting up of merchant plants), and their involvement in bulk trade and competitive retail sales; moreover some choose to specialize in electronuclear production on transport. Lastly, internationalization and diversification towards telecommunications are more frequent there than elsewhere. The purpose of this article is to characterize these strategies in comparison with those of the European electricity companies

  13. Institutional Governance Framework for Determining Carbon-related Accounting Practices: An Exploratory Study of Electricity Generating Companies in Malaysia

    Science.gov (United States)

    Alrazi, B.; Mat Husin, N.

    2016-03-01

    Electricity industry is the major contributor of the global carbon emissions which has been scientifically identified as the main cause of climate change. With the various initiatives being implemented at the international, national, and industry levels, companies in the electricity industry are currently facing immense pressure from various stakeholders to demonstrate their policies, initiatives, targets, and performance on climate change. Against this background, accounting system is argued to be able to be play important roles in combating climate change. Using institutional governance as the underlying framework, we have identified several governance mechanisms as the determining factors for companies to have a systematic accounting system related to carbon emissions. The factors include environmental management system certification, environmental organization, publication of stand-alone sustainability reports, the use of GRI guidelines, environmental strategic planning, governance quality, and participation in CDP surveys and emissions trading scheme. We explored this issue in the context of major electricity generating companies in Malaysia and found that except for certified environmental management system, the other governance mechanisms are still lacking. The findings suggest that companies in Malaysia, in particular, from the electricity industry are not well prepared in facing risks related to climate change.

  14. Design of investment management optimization system for power grid companies under new electricity reform

    Science.gov (United States)

    Yang, Chunhui; Su, Zhixiong; Wang, Xin; Liu, Yang; Qi, Yongwei

    2017-03-01

    The new normalization of the economic situation and the implementation of a new round of electric power system reform put forward higher requirements to the daily operation of power grid companies. As an important day-to-day operation of power grid companies, investment management is directly related to the promotion of the company's operating efficiency and management level. In this context, the establishment of power grid company investment management optimization system will help to improve the level of investment management and control the company, which is of great significance for power gird companies to adapt to market environment changing as soon as possible and meet the policy environment requirements. Therefore, the purpose of this paper is to construct the investment management optimization system of power grid companies, which includes investment management system, investment process control system, investment structure optimization system, and investment project evaluation system and investment management information platform support system.

  15. Efficiency and productivity (TFP) of the Turkish electricity distribution companies: An application of two-stage (DEA and Tobit) analysis

    International Nuclear Information System (INIS)

    Çelen, Aydın

    2013-01-01

    In this study, we analyze the efficiency performances of 21 Turkish electricity distribution companies during the period of 2002–2009. For this aim, we employ a two-stage analysis in order to take into account the business environment variables which are beyond the control of distribution companies. We determine the efficiency performances of the electricity distribution companies by help of DEA in the first stage. Then, in the second stage, using these calculated efficiency scores as dependent variable, we utilize Tobit model to determine the business environment variables which may explain the efficiency scores. According to the results, customer density of the region and the private ownership affect the efficiencies positively. Thus, the best strategy to improve efficiency in the market is privatizing the public distribution companies. - Highlights: • We analyze the efficiencies of 21 Turkish electricity distribution companies. • A two-stage analysis is employed to take into account environmental variables. • We firstly calculate efficiencies of companies with DEA, then Tobit model is used to determine the effects of the variables. • Customer density and ownership type affect the efficiencies positively. • Privatization is a good strategy to improve efficiencies

  16. Simulation of Hawaiian Electric Companies Feeder Operations with Advanced Inverters and Analysis of Annual Photovoltaic Energy Curtailment

    Energy Technology Data Exchange (ETDEWEB)

    Giraldez Miner, Julieta I [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Nagarajan, Adarsh [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Gotseff, Peter [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Krishnan, Venkat K [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Hoke, Anderson F [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Ueda, Reid [Hawaiian Electric Company; Shindo, Jon [Hawaiian Electric Company; Asano, Marc [Hawaiian Electric Company; Ifuku, Earle [Hawaiian Electric Company

    2017-07-26

    The Hawaiian Electric Companies achieved a consolidated Renewable Portfolio Standard (RPS) of approximately 26% at the end of 2016. This significant RPS performance was achieved using various renewable energy sources - biomass, geothermal, solar photovoltaic (PV) systems, hydro, wind, and biofuels - and customer-sited, grid-connected technologies (primarily private rooftop solar PV systems). The Hawaiian Electric Companies are preparing grid-modernization plans for the island grids. The plans outline specific near-term actions to accelerate the achievement of Hawai'i's 100% RPS by 2045. A key element of the Companies' grid-modernization strategy is to utilize new technologies - including storage and PV systems with grid-supportive inverters - that will help to more than triple the amount of private rooftop solar PV systems. The Hawaiian Electric Companies collaborated with the Smart Inverter Technical Working Group Hawai'i (SITWG) to partner with the U.S. Department of Energy's National Renewable Energy Laboratory (NREL) to research the implementation of advanced inverter grid support functions (GSF). Together with the technical guidance from the Companies's planning engineers and stakeholder input from the SITWG members, NREL proposed a scope of work that explored different modes of voltage-regulation GSF to better understand the trade-offs of the grid benefits and curtailment impacts from the activation of selected advanced inverter grid support functions. The simulation results presented in this report examine the effectiveness in regulating voltage as well as the impact to the utility and the customers of various inverter-based grid support functions on two Hawaiian Electric distribution substations.

  17. Geophysical studies of the Crump Geyser known geothermal resource area, Oregon, in 1975

    Science.gov (United States)

    Plouff, Donald

    2006-01-01

    sediment thickness was estimated at 820 meters. A three-dimensional gravity model would have yielded a greater thickness. Audiomagnotelluric measurements were not made as far south as the location of the gravity low, as determined in the field, due to a lack of communication at that time. A boat was borrowed to collect gravity measurements along the edge of Crump Lake, but the attempt was curtailed by harsh, snowy weather on May 21, 1975, which shortly followed days of hot temperature. Most of the geophysical data and illustrations in Appendix 1 have been published (Gregory and Martinez, 1975; Plouff, 1975; and Plouff and Conradi, 1975), and Donald Plouff (1986) discussed a gravity interpretation of Warner Valley at the Fall 1986 American Geophysical Union meeting in San Francisco. Further interpretation of possible subsurface geologic sources of geophysical anomalies was not discussed in Appendix 1. For example, how were apparent resistivity lows (Appendix 1, figs. 3-6) centered near Crump Geyser affected by a well and other manmade electrically conductive or magnetic objects? What is the geologic significance of the 15-milligal eastward decrease across Warner Valley? The explanation that the two-dimensional gravity model (Appendix 1, fig. 14) was based on an inverse iterative method suggested by Bott (1960) was not included. Inasmuch as there was no local subsurface rock density distribution information to further constrain the gravity model, the three-dimensional methodology suggested by Plouff (1976) was not attempted. Inasmuch as the associated publication by Plouff (1975), which released the gravity data, is difficult to obtain and not in digital format, that report is reproduced in Appendix 2. Two figures of the publication are appended to the back of the text. A later formula for the theoretical value of gravity for the given latitudes at sea level (International Association of Geodesy, 1971) should be used to re-compute gravity anomalies. To merge t

  18. 77 FR 56241 - Notice of Withdrawal of Final Design Approval; Westinghouse Electric Company; Advanced Passive 1000

    Science.gov (United States)

    2012-09-12

    ... NUCLEAR REGULATORY COMMISSION [NRC-2010-0131] Notice of Withdrawal of Final Design Approval; Westinghouse Electric Company; Advanced Passive 1000 By letter dated December 10, 2010, Westinghouse Electric... final design approval (FDA) for the Advanced Passive 1000 (AP1000) design upon the completion of...

  19. 76 FR 77022 - In the Matter of Carolina Power & Light Company, H.B. Robinson Steam Electric Plant, Unit No. 2...

    Science.gov (United States)

    2011-12-09

    ... and 72-3] In the Matter of Carolina Power & Light Company, H.B. Robinson Steam Electric Plant, Unit No. 2, H. B. Robinson Steam Electric Plant, Unit 2, Independent Spent Fuel Storage Installation; Order Approving Indirect Transfer of Control of Licenses I. Carolina Power & Light Company (CP&L, the licensee) is...

  20. Southeast Regional Wastewater Treatment Plant Facilities Improvements Project and Geysers Effluent Pipeline Project. Draft EIR/EIS, Volume 2 of 2: Appendices

    International Nuclear Information System (INIS)

    1994-01-01

    The Southeast Regional Wastewater Treatment Plant (SERWTP) Facilities Improvement Plan and Geysers Effluent Pipeline and Effluent Injection Project are proposed as a plan to provide expanded wastewater treatment capabilities and to dispose of the effluent by injection in The Geysers geothermal field for purposes of power production. The project is located predominantly in the County of Lake, California, and also in part of Sonoma County. The plan includes various conventional facilities improvements in wastewater treatment to a secondary level of treatment at the SWERWTP. The plan includes facilities to convey the treated effluent in a 26-mile, 24-inch inside diameter pipeline to the Southeast Geysers. The wastewater from the SERWTP would be supplemented by raw lake water diverted from nearby Clear Lake. At The Geysers, the effluent would be directed into a system of distribution lines to wells. In the geothermal reservoir, the water will be converted to steam and collected in production wells that will direct the steam to six existing power plants. This document is a summary of a combined full Environmental Impact Report (EIR) and Environmental Impact Statement (EIS). The EIR/EIS describes the environmental impacts of the various components of the project. Mitigation measures are suggested for reducing impacts to a less than significant level. This report contains appendices A and B. Appendix A contains notices of preparation/notices of intent and EIR/EIS scoping comments. Appendix B contains GeothermEx, Inc., analysis of Geothermal Reservoir Effects and Induced Seismicity

  1. The development of multimedia communication system for electric power company

    Energy Technology Data Exchange (ETDEWEB)

    Woo, Hee Gon; Kim, Seong Bok [Korea Electric Power Corp. (KEPCO), Taejon (Korea, Republic of). Research Center

    1995-12-31

    It is a final report of the research project that is a development of PC-LAN based multimedia desktop conference system, which is research on the essential technologies and application and development of multimedia communication services for electric power company. This report is consisted of -Survey and study of the multimedia related technologies, -Multimedia communication protocols and network configurations, and -Design, developments of pilot model, evaluation, and applications of multimedia conference system. (author). 112 refs., 250 figs.

  2. The development of multimedia communication system for electric power company

    Energy Technology Data Exchange (ETDEWEB)

    Woo, Hee Gon; Kim, Seong Bok [Korea Electric Power Corp. (KEPCO), Taejon (Korea, Republic of). Research Center

    1996-12-31

    It is a final report of the research project that is a development of PC-LAN based multimedia desktop conference system, which is research on the essential technologies and application and development of multimedia communication services for electric power company. This report is consisted of -Survey and study of the multimedia related technologies, -Multimedia communication protocols and network configurations, and -Design, developments of pilot model, evaluation, and applications of multimedia conference system. (author). 112 refs., 250 figs.

  3. 76 FR 66333 - Carolina Power & Light Company, H.B. Robinson Steam Electric Plant, Unit No. 2; Environmental...

    Science.gov (United States)

    2011-10-26

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 50-261; NRC-2011-0247] Carolina Power & Light Company, H.B. Robinson Steam Electric Plant, Unit No. 2; Environmental Assessment and Finding of No Significant... Facility Operating License No. DPR-23, issued to Carolina Power & Light Company (the licensee), for...

  4. Green marketing in the Massachusetts electric company retail competition pilot program

    Energy Technology Data Exchange (ETDEWEB)

    Rothstein, S.M.; Fang, J.M.

    1997-10-01

    With electric industry restructuring initiatives being introduced on the state and federal levels, retail access pilot programs serve an important function for examining competitive market issues, as well as marketing strategies and customer reactions to different power supply options. The experience gained through these pilots provides important insights into future power market operations, including the market for green power. The Massachusetts Electric Company`s (MECo`s) Choice: New England pilot for residential and small-business customers was a voluntary program developed primarily to test the billing and metering logistics that distribution companies will need in the competitive market. The pilot also offered a preview of program implementation and marketing under customer choice. It was the first retail competition pilot to explicitly include green power options in program design. The MECo pilot`s energy suppliers were selected through the issuance of a request for proposals (RFP). Respondents were asked to submit bids in one or more of three energy supply categories-price, green, and other options. These options were developed by the pilot administrator through internal meetings, discussions with state officials and other stakeholders, and a review of information from other similar pilots. For the green option, the pilot administrator did not establish a green standard. Instead, suppliers were allowed to submit offers that promoted environmental stewardship. Customer response to the different green options are reported. The pilot results clearly demonstrate that, in a competitive situation, there is interest in a variety of energy supply options, including green options. 2 tabs.

  5. L'Anse Warden Electric Company Boiler Number One Emission Test Report – March 2017

    Science.gov (United States)

    L’Anse Warden Electric Company (LWEC) submitted results from an emission test on the Boiler No. 1 stack. Stack air emission testing was conducted in March 2017, and the report became available in June 2017

  6. L'Anse Warden Electric Company Boiler Number One Emission Test Report – December 2016

    Science.gov (United States)

    L’Anse Warden Electric Company (LWEC) submitted results from an emission test on the Boiler No. 1 stack. Stack air emission testing was conducted in December 2016, and the report became available in January 2017

  7. L'Anse Warden Electric Company Boiler Number One Emission Test Report – July 2016

    Science.gov (United States)

    L’Anse Warden Electric Company (LWEC) submitted results from an emission test on the Boiler No. 1 stack. Stack air emission testing was conducted in July 2016, and the report became available in August 2016.

  8. L'Anse Warden Electric Company Boiler Number One Emission Test Report – June 2017

    Science.gov (United States)

    L’Anse Warden Electric Company (LWEC) submitted results from an emission test on the Boiler No. 1 stack. Stack air emission testing was conducted in March 2017, and the report became available in June 2017

  9. GEYSERS: a novel architecture for virtualization and co-provisioning of dynamic optical networks and IT services

    NARCIS (Netherlands)

    Escalona, E.; Peng, S.; Nejabati, R.; Simeonidou, D.; García-Espín, J.A.; Ferrer, J.; Figuerola, S.; Landi, G.; Ciulli, N.; Jiménez, J.; Belter, B.; Demchenko, Y.; de Laat, C.; Chen, X.; Yukan, A.; Soudan, S.; Vicat-Blanc, P.; Buysse, J.; de Leenheer, M.; Develder, C.; Tzanakaki, A.; Robinson, P.; Brogle, M.; Bohnert, T.M.

    2011-01-01

    GEYSERS aims at defining an end-to-end network architecture that offers a novel planning, provisioning and operational framework for optical network and IT infrastructure providers and operators. In this framework, physical infrastructure resources (network and IT) are dynamically partitioned to

  10. Barriers to electricity load shift in companies: A survey-based exploration of the end-user perspective

    International Nuclear Information System (INIS)

    Olsthoorn, Mark; Schleich, Joachim; Klobasa, Marian

    2015-01-01

    As countries move toward larger shares of renewable electricity, the slow diffusion of active electricity load management should concern energy policy makers and users alike. Active load management can increase capacity factors and thereby reduce the need for new capacity, improve reliability, and lower electricity prices. This paper conceptually and empirically explores barriers to load shift in industry from an end-user perspective. An online survey, based on a taxonomy of barriers developed in the realm of energy efficiency, was carried out among manufacturing sites in mostly Southern Germany. Findings suggest that the most important barriers are risk of disruption of operations, impact on product quality, and uncertainty about cost savings. Of little concern are access to capital, lack of employee skills, and data security. Statistical tests suggest that companies for which electricity has higher strategic value rate financial and regulatory risk higher than smaller ones. Companies with a continuous production process report lower barrier scores than companies using batch or just-in-time production. A principal component analysis clusters the barriers and multivariate analysis with the factor scores confirms the prominence of technical risk as a barrier to load shift. The results provide guidance for policy making and future empirical studies. - Highlights: • We quantitatively assess barriers to load shift adoption among manufacturing firms. • Conceptually, we build on the literature on barriers to energy efficiency. • The most important barriers are interference with production and with product quality. • Companies with a continuous production process report lower barrier scores. • The barriers to load shift may be organized in distinct clusters via principal component analysis

  11. Efficiency and regulation of the Slovenian electricity distribution companies

    International Nuclear Information System (INIS)

    Filippini, Massimo; Hrovatin, Nevenka; Zoric, Jelena

    2004-01-01

    The Slovenian Energy Law, adopted in 1999, has opened the internal market to competition up to 64% of the final consumption. The opening of the internal market to foreign competition is envisaged for 2003. With regard to the methodology of price regulation, the Energy Law introduces the 'price-cap' regulation, which aims to give firms incentive for cost reduction. To provide information for effective price regulation, we estimated a cost frontier function on a sample of Slovenian electricity distribution utilities over the 1991-2000 period. The estimated efficient frontier could be used by Slovenian regulatory agency as a benchmark to regulate network access prices. Our results show that Slovenian distribution companies are cost inefficient. We have also proved the presence of increasing returns to scale with most utilities not achieving the minimum efficient scale. Thus, the Slovenian regulatory authority should consider how to induce mergers of small electricity distribution utilities into larger units

  12. R&D+ i Strategic Management in a Public Company in the Brazilian Electric Sector

    Directory of Open Access Journals (Sweden)

    Ruy De Quadros Carvalho

    2013-05-01

    Full Text Available The purpose of this paper is - by reporting an experience of structuring processes and tools related to the strategic management of R&D in the electricity sector – to show the conditions and potential for improved efficiency, efficacy, and effectiveness in the R&D program set by ANEEL. The methodology is action research. This is because the proposed and tested model is the result of reflection and resolution of critical organizational issues, applied in a public company in the electric power sector. Act No. 9,991 of July 24, 2000 provides for the obligation on the part of concessionaires, permittees, and licensees in the electric power sector to invest part of their operating revenue in research and development (R&D. For the effective implementation of these legal obligations, companies prepare their annual R&D programs, comprising projects that aim at developing innovative solutions for their processes and increasing business efficiency. However, the urgency to comply with the contractual provisions, coupled with the small amount of experience most companies have when it comes to carrying out R&D activities and projects, has led to the gradual formation of a mode of R&D implementation and management that does not favor its optimization and alignment with the goals the utility companies and the sector’s own technological development . The approach proposed in this paper consists of structuring the processes and tools related to the management of R&D driven by innovation (R&D+i and aligned with with the business strategy. These processes include the adoption of procedures and tools to manage structured, integrated decision-making flows involved in the innovation process, aiming at full alignment with business goals and objectives.

  13. The impact of injection on seismicity at The Geysers, California Geothermal Field

    OpenAIRE

    Majer, Ernest L.; Peterson, John E.

    2007-01-01

    Water injection into geothermal systems has often become a required strategy to extend and sustain production of geothermal resources. To reduce a trend of declining pressures and increasing non-condensable gas concentrations in steam produced from The Geysers, operators have been injecting steam condensate, local rain and stream waters, and most recently treated wastewater piped to the field from neighboring communities. If geothermal energy is to provide a significant increase in energy in ...

  14. 76 FR 68634 - Airworthiness Directives; General Electric Company (GE) CF6 Turbofan Engines

    Science.gov (United States)

    2011-11-07

    ... Airworthiness Directives; General Electric Company (GE) CF6 Turbofan Engines AGENCY: Federal Aviation... ``(c) This AD applies to * * * and CF6-80A3 turbofan engines with left-hand links * * *.'' to ``(c) This AD applies to * * * and CF6-80A3 turbofan engines, including engines marked on the engine data...

  15. Measuring efficiency and productivity change in power electric generation management companies by using data envelopment analysis: A case study

    International Nuclear Information System (INIS)

    Fallahi, Alireza; Ebrahimi, Reza; Ghaderi, S.F.

    2011-01-01

    This paper provides an empirical analysis of the determinants of energy efficiency in 32 power electric generation management companies over the period 2005–2009. The study uses non-parametric Data Envelopment Analysis (DEA) to estimate the relative technical efficiency and productivity change of these companies. In order to verify the stability of our DEA model and the importance of each input variable, a stability test is also conducted. The results of the study indicate that average technical efficiency of companies decreased during the study period. Nearly half of the companies (14) are below this average level of 88.7% for five years. Moreover, it is shown that the low increase of productivity changes is more related to low efficiency rather than technology changes. -- Highlights: ► DEA was applied on the 32 power electric generation management companies. ► A stability test is applied to verify the stability of DEA model. ► Average technical efficiency of companies decreased during the study period. ► The low increase of productivity changes is more related to low efficiency changes.

  16. 75 FR 82414 - Carolina Power & Light Company; H. B. Robinson Steam Electric Plant, Unit No. 2; Exemption

    Science.gov (United States)

    2010-12-30

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 50-261; NRC-2010-0062] Carolina Power & Light Company; H. B. Robinson Steam Electric Plant, Unit No. 2; Exemption 1.0 Background Carolina Power & Light... authorizes operation of the H.B. Robinson Steam Electric Plant, Unit 2 (HBRSEP). The license provides, among...

  17. 75 FR 11579 - Carolina Power & Light Company H. B. Robinson Steam Electric Plant, Unit No. 2; Exemption

    Science.gov (United States)

    2010-03-11

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 50-261; NRC-2010-0062] Carolina Power & Light Company H. B. Robinson Steam Electric Plant, Unit No. 2; Exemption 1.0 Background Carolina Power & Light... of the H. B. Robinson Steam Electric Plant, Unit 2 (HBRSEP). The license provides, among other things...

  18. Ground penetrating radar documents short-term near-surface hydrological changes around Old Faithful Geyser, Yellowstone National Park, USA

    Science.gov (United States)

    Lynne, Bridget Y.; Heasler, Henry; Jaworowski, Cheryl; Smith, Gary J.; Smith, Isaac J.; Foley, Duncan

    2018-04-01

    In April 2015, Ground Penetrating Radar (GPR) was used to characterize the shallow subsurface (images were collected between two eruptions of Old Faithful Geyser. Each set of time-sequence GPR recordings consisted of four transects aligned to provide coverage near the potential location of the inferred 15 m deep geyser chamber. However, the deepest penetration we could achieve with a 200 MHz GPR antennae was 5 m. Seven time-sequence events were collected over a 48-minute interval to image changes in the near-surface, during pre- and post-eruptive cycles. Time-sequence GPR images revealed a series of possible micro-fractures in a highly porous siliceous sinter in the near-surface that fill and drain repetitively, immediately after an eruption and during the recharge period prior to the next main eruptive event.

  19. RETRAN experience with BWR transients at Yankee Atomic Electric Company

    International Nuclear Information System (INIS)

    Ansari, A.A.F.; Cronin, J.T.; Slifer, B.C.

    1981-01-01

    Yankee Atomic Electric Company is actively involved in the development of licensing methods for BWR's. The computer code chosen for analyzing system response under transient conditions is RETRAN. This paper describes the RETRAN model developed for Vermont Yankee, and the results of the RETRAN checkout and qualification that has been achieved at YAEC through comparison of RETRAN predictions to the startup test results performed at the plant as part of the 100% power startup test program. In addition, abnormal operational transients typically analyzed for licensing are also presented

  20. Tampa electric company - IGCC project. Quarterly report, January 1, 1996--March 31, 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    This quarterly report consists of materials presented at a recent review of the project. The project is an IGCC project being conducted by Tampa Electric Company. The report describes the status of the facility construction, components, operations staff training, and discusses aspects of the project which may impact the final scheduled completion.

  1. POSSIBILITIES OF APPLYING THE DEA METHOD IN THE ASSESSMENT OF EFFICIENCY OF COMPANIES IN THE ELECTRIC POWER INDUSTRY: REVIEW OF WIND ENERGY COMPANIES

    Directory of Open Access Journals (Sweden)

    Dario Maradin

    2014-07-01

    Full Text Available One of the fundamental tasks of modern power system is finding ways to produce stable and continuous electricity from scarce energy resources. One of the possible solutions is introduction, implementation and improvement of alternative forms of energy such as renewable energy sources, particularly wind energy as an increasingly important energy source which is expected to further increase its share in total electricity production. Numerous methods can be used in assessing the efficiency of wind energy companies, and in the focus of this research is the Data Envelopment Analysis method (DEA, a widely accepted methodology given its interdisciplinary approach and flexibility. This method represents a step forward in the field of renewable energy management, because it provides the possibility to compare the selected companies with the best in the industry (the most efficient and the possibility of determining sources of inefficiency and, consequently, the possibilities of their elimination.

  2. An agent-based simulation of power generation company behavior in electricity markets under different market-clearing mechanisms

    International Nuclear Information System (INIS)

    Aliabadi, Danial Esmaeili; Kaya, Murat; Şahin, Güvenç

    2017-01-01

    Deregulated electricity markets are expected to provide affordable electricity for consumers through promoting competition. Yet, the results do not always fulfill the expectations. The regulator's market-clearing mechanism is a strategic choice that may affect the level of competition in the market. We conceive of the market-clearing mechanism as composed of two components: pricing rules and rationing policies. We investigate the strategic behavior of power generation companies under different market-clearing mechanisms using an agent-based simulation model which integrates a game-theoretical understanding of the auction mechanism in the electricity market and generation companies' learning mechanism. Results of our simulation experiments are presented using various case studies representing different market settings. The market in simulations is observed to converge to a Nash equilibrium of the stage game or to a similar state under most parameter combinations. Compared to pay-as-bid pricing, bid prices are closer to marginal costs on average under uniform pricing while GenCos' total profit is also higher. The random rationing policy of the ISO turns out to be more successful in achieving lower bid prices and lower GenCo profits. In minimizing GenCos' total profit, a combination of pay-as-bid pricing rule and random rationing policy is observed to be the most promising. - Highlights: • An agent-based simulation of generation company behavior in electricity markets is developed. • Learning dynamics of companies is modeled with an extended Q-learning algorithm. • Different market clearing mechanisms of the regulator are compared. • Convergence to Nash equilibria is analyzed under different cases. • The level of competition in the market is studied.

  3. Training Needs Assessment of Technical Skills in Managers of Tehran Electricity Distribution Company

    Science.gov (United States)

    Koohi, Amir Hasan; Ghandali, Fatemeh; Dehghan, Hasan; Ghandali, Najme

    2016-01-01

    Current dissertation has been conducted in order to investigate and detect training needs of the mangers (top and middle) in Tehran Electricity Distribution Company. Research method is applied kind based on its purpose. Due to data collection method, this query is descriptive-survey type. Statistical population in this study is all of managers in…

  4. Project of law modified by the Senate relative to the electric and gas public utilities and to the electric and gas companies

    International Nuclear Information System (INIS)

    2004-07-01

    This project of law aims to adapt the electricity and gas sector to the new economical context of opening of the energy markets to competition. It gives to energy companies the internal organization base necessary to warrant a high level of service and a transparent and non-discriminatory access of third parties to transport and distribution networks. These evolutions will allow Electricite de France (EdF) and Gaz de France (GdF) companies to compete on equal terms with their European competitors. It confirms first the prime role of public utility of both companies and then transposes the dispositions of the European directives relative to the organization of EdF and GdF integrated companies. It foresees the creation of two daughter companies for the management of energy transport activities. The project of law foresees also the change of the status of EdF and GdF companies and the reform of the retirement pensions of the personnel. This report presents the modifications added by the Senate to the text of law adopted at first reading by the House of Commons. (J.S.)

  5. Attitudes of the general public and electric power company employees toward nuclear power generation

    International Nuclear Information System (INIS)

    Komiyama, Hisashi

    1997-01-01

    We conducted an awareness survey targeted at members of the general public residing in urban areas and in areas scheduled for construction of nuclear power plants as well as employees of electric power company in order to determine the awareness and attitude structures of people residing near scheduled construction sites of nuclear power plants with respect to nuclear power generation, and to examine ways of making improvements in terms of promoting nuclear power plant construction sites. Analysis of those results revealed that there are no significant differences in the awareness and attitudes of people residing in urban areas and in areas near scheduled construction sites. On the contrary, a general sense of apprehension regarding the construction of nuclear power plants was observed common to both groups. In addition, significant differences in awareness and attitudes with respect to various factors were determined to exist between members of the general public residing in urban areas and scheduled construction sites and employees of electric power company. (author)

  6. Managing electricity procurement cost and risk by a local distribution company

    International Nuclear Information System (INIS)

    Woo, C.-K.; Karimov, R.I.; Horowitz, Ira

    2004-01-01

    A local electricity distribution company (LDC) can satisfy some of its future electricity requirements through self-generation and volatile spot markets, and the remainder through fixed-price forward contracts that will reduce its exposure to the inherent risk of spot-price volatility. A theoretical framework is developed for determining the forward-contract purchase that minimizes the LDCs expected procurement cost, subject to a cost-exposure constraint. The answers to the questions of 'What to buy?' and 'How to buy?' are illustrated using an example of a hypothetical LDC that is based on a municipal utility in Florida. It is shown that the LDCs procurement decision is consistent with least-cost procurement subject to a cost-exposure constraint, and that an internet-based multi-round auction can produce competitive price quotes for its desired forward purchase

  7. Chapter 3. The economical power of the company

    International Nuclear Information System (INIS)

    1998-01-01

    In the third chapter of this CD ROM the economic power of the Slovak Electric, Plc. (Slovenske elektrarne, a.s.), is presented. It consist of next paragraphs (1) Property of Slovak Electric, Plc, the company; (2) Position of the Company; (3) Business performance of the Company (Economic results, Installed capacity, Generation of electricity and heat; Electricity trade, Distribution of electricity and heat trade are reviewed); (4) Shareholdings in other companies and international co-operation

  8. Did a local distribution company procure prudently during the California electricity crisis?

    International Nuclear Information System (INIS)

    Woo, C.-K.; Lloyd, Debra; Clayton, William

    2006-01-01

    To manage cost risk, prudent procurement of electric power requires that some portion of a buyer's energy demand be met through long-term contracting. Under cost-of-service regulation or performance-based regulation, a local distribution company (LDC) should be allowed to fully recover all prudently incurred power procurement costs. However, the regulatory test of prudence is an ex post review with the threat of disallowance. This paper presents an economic analysis of procurement prudence involving a small LDC, Bear Valley Electric Service (BVES), which serves a resort area in Southern California. The key findings are: (a) high and volatile prices and rolling blackouts characterized the market environment faced by the owner of BVES, Southern California Water Company (SCWC), at its signing of a 5-year fixed price contract; (b) SCWC was a price-taker with no incentive to act imprudently; (c) the contract was obtained via a competitive bidding process; (d) the contract price was comparable to the benchmark price of contemporaneous contracts; (e) the fixed price contract was economic when compared to available alternatives; and (f) despite (a)-(e), a negotiated settlement with the state regulator and a large user resulted in substantial disallowance. The policy implication is that a regulator should approve a prudent procurement plan proposed by an LDC to remove the unreasonable risk of an ex post review. If the LDC strictly adheres to the plan, the resulting electricity purchases are per se prudent and should entitle the LDC to full cost recovery

  9. Investment Cost Model in Business Process Intelligence in Banking And Electricity Company

    Directory of Open Access Journals (Sweden)

    Arta Moro Sundjaja

    2016-06-01

    Full Text Available Higher demand from the top management in measuring business process performance causes the incremental implementation of BPM and BI in the enterprise. The problem faced by top managements is how to integrate their data from all system used to support the business and process the data become information that able to support the decision-making processes. Our literature review elaborates several implementations of BPI on companies in Australia and Germany, challenges faced by organizations in developing BPI solution in their organizations and some cost model to calculate the investment of BPI solutions. This paper shows the success in BPI application of banks and assurance companies in German and electricity work in Australia aims to give a vision about the importance of BPI application. Many challenges in BPI application of companies in German and Australia, BPI solution, and data warehouse design development have been discussed to add insight in future BPI development. And the last is an explanation about how to analyze cost associated with BPI solution investment.

  10. Development of a record retention and retrieval system for the Baltimore Gas and Electric Company

    International Nuclear Information System (INIS)

    Hoffman, H.L.

    1976-01-01

    The records associated with the design and construction of a nuclear power plant have increased in both volume and complexity. Baltimore Gas and Electric Company chose to retain and make available these records by using microfilm and a computer-generated index system. The technique of filming, data assembly, and controlled distribution of this material to various locations within the Company was developed and implemented. The index system has been designed to locate information and to provide a basis for searches of the data base for special information

  11. Preparing Canada`s power systems for transition to the Year 2000: Y2K readiness assessment results for Canadian electric utility companies: second quarter 1999

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-08-25

    The report describes the state of readiness of Canadian electric utility companies with respect to the Year 2000 computer challenge. It complements the North American Electric Reliability Council Report entitled `Preparing the Electric Power Systems of North America for Transition to the Year 2000: A Status and Work Plan.` Two surveys were employed to gather information for this report. The first, a detailed survey prepared by NERC, was forwarded to all major electric utilities that comprise the Bulk Electricity System in North America. CEA has removed the Canadian findings from the overall North American results, and has presented those findings in this report. The second was a shorter, more simplified study, conducted by CEA and Natural Resources Canada. Whereas small companies involved only in the distribution aspect of the electricity business were not asked to complete the NERC assessment, all Canadian electric utility companies were part of the shorter survey. Chapter 2 covers specifically the readiness status and project management for non-nuclear generation, nuclear generation, energy management systems, telecommunications systems, substation controls, system protection and distribution systems, business information systems, and small distribution companies.

  12. How the largest electric and gas utility companies administer public relations

    Energy Technology Data Exchange (ETDEWEB)

    Bogart, J.D.

    1979-04-12

    This article describes the findings of a survey conducted by the author in the second half of 1978 to determine the sizes of the public relations staffs of the nation's largest operating electric and gas utilities, their budgets, organizational differences, and specific functions. Common public relations issues and major public relations problems of the utilities are identified, as well as recent trends or changes in budgeting and organization. Some functional variations of public relations departments among utility companies were detected and described.

  13. Handling of Environmental Related Requirements : Awareness and Ability to Act at Small and Medium Sized Electric and Electronic Companies

    OpenAIRE

    Lin, Han-Hsuan

    2008-01-01

    Environmental related product requirements are increasing worldwide from government authorities, customers and other stakeholders. For small and medium sized companies manufacturing electric and electronic products it is more difficult compared to bigger companies to meet new product related requirements due to smaller budget, resources and knowledge. This research studies the awareness and ability to act upon changes when small and medium sized companies in Sweden face environmental related ...

  14. Managing electricity procurement cost and risk by a local distribution company

    International Nuclear Information System (INIS)

    Chikeung Woo; Karimov, R.I.; Horowitz, I.

    2004-01-01

    A local electricity distribution company (LDC) can satisfy some of its future electricity requirements through self-generation and volatile spot markets, and the remainder through fixed-price forward contracts that will reduce its exposure to the inherent risk of spot-price volatility. A theoretical framework is developed for determining the forward-contract purchase that minimizes the LDCs expected procurement cost, subject to a cost-exposure constraint. The answers to the questions of ''What to buy?'' and ''How to buy?'' are illustrated using an example of a hypothetical LDC that is based on a municipal utility in Florida. It is shown that the LDCs procurement decision is consistent with least-cost procurement subject to a cost-exposure constraint, and that an internet-based multi-round auction can produce competitive price quotes for its desired forward purchase. (author)

  15. Environmental Disclosure of Electric Power Companies Listed in the Corporate Sustainability Index (CSI

    Directory of Open Access Journals (Sweden)

    Clésia Ana Gubiani

    2012-12-01

    Full Text Available The study aimed to verify the level of disclosure of environmental information in the administration reports of the energy companies listed in the Corporate Sustainability Index (CSI. A descriptive and quantitative research was done, using the content analysis technique on the administration reports from 2006 to 2008. The sample consisted of 11 electric power companies listed in the CSI. For quantitative analysis of the disclosure index, the data collection instrument was based on the study of Rover, Murcia and Borba (2008, which proposes eight environmental categories and 36 subcategories. For the whole analysis of the data were elaborated networks of the items disclosed in each company, using the software UNICET ®. The survey results showed that there is satisfactory disclosure in the categories of environmental policies and education, training and research environment. However, it was found that there is need for greater disclosure of categories of products impacts and processes in the environment, power polices and financial environmental information. It was concluded that the information disclosed in the administration reports of the companies surveyed about the environmental information do not respect the principle of full disclosure.

  16. 76 FR 28023 - Duke Energy Carolinas, LLC, South Carolina Electric & Gas Company; Notice of Meetings

    Science.gov (United States)

    2011-05-13

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2232-522; Project No. 516-459] Duke Energy Carolinas, LLC, South Carolina Electric & Gas Company; Notice of Meetings On March 18, 2011, the National Marine Fisheries Service (NMFS) requested a meeting with Duke Energy Carolinas, LLC...

  17. 78 FR 56944 - Pacific Gas and Electric Company; Humboldt Bay Independent Spent Fuel Storage Installation

    Science.gov (United States)

    2013-09-16

    ... process waste at the Humboldt Bay ISFSI will not significantly affect the quality of the human environment... NUCLEAR REGULATORY COMMISSION [Docket No. 72-27; NRC-2011-0115] Pacific Gas and Electric Company; Humboldt Bay Independent Spent Fuel Storage Installation AGENCY: Nuclear Regulatory Commission. ACTION...

  18. Water-chemistry data for selected springs, geysers, and streams in Yellowstone National Park, Wyoming, 2006-2008

    Science.gov (United States)

    Ball, James W.; McMleskey, R. Blaine; Nordstrom, D. Kirk

    2010-01-01

    Water analyses are reported for 104 samples collected from numerous thermal and non-thermal features in Yellowstone National Park (YNP) during 2006-2008. Water samples were collected and analyzed for major and trace constituents from 10 areas of YNP including Apollinaris Spring and Nymphy Creek along the Norris-Mammoth corridor, Beryl Spring in Gibbon Canyon, Norris Geyser Basin, Lower Geyser Basin, Crater Hills, the Geyser Springs Group, Nez Perce Creek, Rabbit Creek, the Mud Volcano area, and Washburn Hot Springs. These water samples were collected and analyzed as part of research investigations in YNP on arsenic, antimony, iron, nitrogen, and sulfur redox species in hot springs and overflow drainages, and the occurrence and distribution of dissolved mercury. Most samples were analyzed for major cations and anions, trace metals, redox species of antimony, arsenic, iron, nitrogen, and sulfur, and isotopes of hydrogen and oxygen. Analyses were performed at the sampling site, in an on-site mobile laboratory vehicle, or later in a U.S. Geological Survey laboratory, depending on stability of the constituent and whether it could be preserved effectively. Water samples were filtered and preserved on-site. Water temperature, specific conductance, pH, emf (electromotive force or electrical potential), and dissolved hydrogen sulfide were measured on-site at the time of sampling. Dissolved hydrogen sulfide was measured a few to several hours after sample collection by ion-specific electrode on samples preserved on-site. Acidity was determined by titration, usually within a few days of sample collection. Alkalinity was determined by titration within 1 to 2 weeks of sample collection. Concentrations of thiosulfate and polythionate were determined as soon as possible (generally a few to several hours after sample collection) by ion chromatography in an on-site mobile laboratory vehicle. Total dissolved iron and ferrous iron concentrations often were measured on-site in the

  19. Centralized vs. decentralized thermal IR inspection policy: experience from a major Brazilian electric power company

    Science.gov (United States)

    dos Santos, Laerte; da Costa Bortoni, Edson; Barbosa, Luiz C.; Araujo, Reyler A.

    2005-03-01

    Furnas Centrais Elétricas S.A is one of the greatest companies of the Brazilian electric power sector and a pioneer in using infrared thermography. In the early 70s, the maintenance policy used was a centralized approach, with only one inspection team to cover all the company"s facilities. In the early 90s, FURNAS decided to decentralize the thermography inspections creating several inspection teams. This new maintenance policy presented several advantages when compared to the previous one. However the credibility of the results obtained with the thermal inspection was frequently being questioned, in part due to the lack of a detailed planning to carry out the transition from the centralized inspection to the decentralized one. In some areas of the company it was suggested the inactivation of the thermography. This paper presents the experience of FURNAS with these different maintenance policies and details the procedures which have been taken that nowadays the infrared thermal inspection has become one of the most important techniques of predictive maintenance in the company.

  20. An FAHP-TOPSIS framework for analysis of the employee productivity in the Serbian electrical power companies

    Directory of Open Access Journals (Sweden)

    Snezana Pavle Knezevic

    2017-09-01

    Full Text Available The aim of this paper is to apply an integrated model, which combines methods of classical and fuzzy Multi-criteria decision making (MCDM in selected six large equity companies from the Serbian energy sector. The data considered are retrieved from the official financial statements. Four main criteria were analyzed, identified by the previous researchers and pointing to the employees productivity: Operating income/Number of employees, Equity/Number of employees, Net income/Number of employees and Total assets/Number of employees. The contribution of this paper lies in the application of a hybrid model that integrates two MCDM methods: Fuzzy Analytic Hierarchy Process (FAHP and Technique for Order Performance by Similarity to Ideal Solution (TOPSIS to analyse the employee productivity in selected D-Electrical power supply companies operating in Serbia. The FAHP is an effective method for mathematical representation of uncertain and imprecise evaluations made by humans, while the TOPSIS method is an efficient way to rank the alternatives. Results show that operating income is of highest importance for estimating employee productivity and decision making, while equity is of the weakest. Furthermore, the most productive operations in large enterprises from selected companies of the sector D-Electrical power supply are found in the company PC EPS Beograd, and the lowest are in the ED Center llc Kragujevac.

  1. The French Electricity Company (EDF) and the environment. Press file for 1996

    International Nuclear Information System (INIS)

    Bourdier, Jean-Pierre

    1997-01-01

    In 1996 the actions of EDF in the domain of environment have recorded FF 4 billions (FF 3.5 billion in 1995), representing about 2% of the EDF's turnover. The EDF keeps on its efforts for reducing the impact of its activities upon environment. Several applications of an environment protective electricity generation are promoted by the company. The company brings services and technical solutions to its clients which meet their energy needs and conserving at the same time the life conditions. Furthermore, EDF participates in the activity of numerous national and international organisms, intervening in the environmental questions, in decision making, participating in studies and actions and following continually the direction of a durable economic and social development. The report is structured in three chapters: 1. an industrial responsibility; 2. services and techniques for environment; 3. action towards a durable development

  2. Oxygen isotope geochemistry of The Geysers reservoir rocks, California

    Energy Technology Data Exchange (ETDEWEB)

    Gunderson, Richard P.; Moore, Joseph N.

    1994-01-20

    Whole-rock oxygen isotopic compositions of Late Mesozoic graywacke, the dominant host rock at The Geysers, record evidence of a large liquid-dominated hydrothermal system that extended beyond the limits of the present steam reservoir. The graywackes show vertical and lateral isotopic variations that resulted from gradients in temperature, permeability, and fluid composition during this early liquid-dominated system. All of these effects are interpreted to have resulted from the emplacement of the granitic "felsite" intrusion 1-2 million years ago. The {delta}{sup 18}O values of the graywacke are strongly zoned around a northwest-southeast trending low located near the center of and similar in shape to the present steam system. Vertical isotopic gradients show a close relationship to the felsite intrusion. The {delta}{sup 18}O values of the graywacke decrease from approximately 15 per mil near the surface to 4-7 per mil 300 to 600 m above the intrusive contact. The {delta}{sup 18}O values then increase downward to 8-10 per mil at the felsite contact, thereafter remaining nearly constant within the intrusion itself. The large downward decrease in {delta}{sup 18}O values are interpreted to be controlled by variations in temperature during the intrusive event, ranging from 150{degree}C near the surface to about 425{degree}C near the intrusive contact. The upswing in {delta}{sup 18}O values near the intrusive contact appears to have been caused by lower rock permeability and/or heavier fluid isotopic composition there. Lateral variations in the isotopic distributions suggests that the effects of temperature were further modified by variations in rock permeability and/or fluid-isotopic composition. Time-integrated water:rock ratios are thought to have been highest within the central isotopic low where the greatest isotopic depletions are observed. We suggest that this region of the field was an area of high permeability within the main upflow zone of the liquid

  3. Cost structure analysis of commercial nuclear power plants in Japan based on corporate financial statements of electric utility companies

    International Nuclear Information System (INIS)

    Kunitake, Norifumi; Nagano, Koji; Suzuki, Tatsujiro

    1998-01-01

    In this paper, we analyze past and current cost structure of commercial nuclear power plants in Japan based on annual corporate financial statements published by the Japanese electric utility companies, instead of employing the conventional methodology of evaluating the generation cost for a newly constructed model plant. The result of our study on existing commercial nuclear plants reveals the increasing significance of O and M and fuel cycle costs in total generation cost. Thus, it is suggested that electric power companies should take more efforts to reduce these costs in order to maintain the competitiveness of nuclear power in Japan. (author)

  4. 75 FR 47644 - General Electric Company, Transportation Division, Including On-Site Leased Workers From Adecco...

    Science.gov (United States)

    2010-08-06

    ... DEPARTMENT OF LABOR Employment and Training Administration [TA-W-71,174] General Electric Company... that was totally or partially separated from employment. It was determined, however, that imports of... Globalization Adjustment Assistance Act of 2009, section 222 of the Act (19 U.S.C. 2272) covers foreign...

  5. Caldwell Ranch Exploration and Confirmation Project, Northwest Geysers, CA

    Energy Technology Data Exchange (ETDEWEB)

    Walters, Mark A.

    2013-04-25

    The purpose of the Caldwell Ranch Exploration and Confirmation Project was to drill, test, and confirm the present economic viability of the undeveloped geothermal reservoir in the 870 acre Caldwell Ranch area of the Northwest Geysers that included the CCPA No.1 steam field. All of the drilling, logging, and sampling challenges were met. Three abandoned wells, Prati 5, Prati 14 and Prati 38 were re-opened and recompleted to nominal depths of 10,000 feet in 2010. Two of the wells required sidetracking. The flow tests indicated Prati 5 Sidetrack 1 (P-5 St1), Prati 14 (P-14) and Prati 38 Sidetrack 2 (P-38 St2) were collectively capable of initially producing an equivalent of 12 megawatts (MWe) of steam using a conversion rate of 19,000 pounds of steam/hour

  6. The effect of electric transmission constraints on how power generation companies bid in the Colombian electrical power market

    Directory of Open Access Journals (Sweden)

    Luis Eduardo Gallego Vega

    2010-05-01

    Full Text Available This paper presents the results of research about the effect of transmission constraints on both expected electrical energy to be dispatched and power generation companies’ bidding strategies in the Colombian electrical power market. The proposed model simulates the national transmission grid and economic dispatch by means of optimal power flows. The proposed methodology allows structural problems in the power market to be analyzed due to the exclusive effect of trans- mission constraints and the mixed effect of bidding strategies and transmission networks. A new set of variables is proposed for quantifying the impact of each generation company on system operating costs and the change in expected dispatched energy. A correlation analysis of these new variables is presented, revealing some interesting linearities in some generation companies’ bidding patterns.

  7. Land-use conflicts in The Geysers-Calistoga KGRA: a preliminary study

    Energy Technology Data Exchange (ETDEWEB)

    O' Banion, K.; Hall, C.; Haven, K.

    1979-12-01

    This preliminary study of potential land use conflicts of geothermal development in The Geysers region, one component of the LLL/LBL socioeconomic program, focuses on Lake County because it has most of the undeveloped resource and the least regulatory capability. The land resource is characterized in terms of its ecological, hydrological, agricultural, and recreational value; intrinsic natural hazards; and the adequacy of roads and utility systems and each factor is depicted on a map. Then those factors are analyzed for potential conflicts with both geothermal and urban development and the conflicts displayed on respective maps. A brief review of laws and methods germane to geothermal land-use regulation is included.

  8. Characterizing Fractures in Geysers Geothermal Field by Micro-seismic Data, Using Soft Computing, Fractals, and Shear Wave Anisotropy

    Energy Technology Data Exchange (ETDEWEB)

    Aminzadeh, Fred [Univ. of Southern California, Los Angeles, CA (United States); Sammis, Charles [Univ. of Southern California, Los Angeles, CA (United States); Sahimi, Mohammad [Univ. of Southern California, Los Angeles, CA (United States); Okaya, David [Univ. of Southern California, Los Angeles, CA (United States)

    2015-04-30

    The ultimate objective of the project was to develop new methodologies to characterize the northwestern part of The Geysers geothermal reservoir (Sonoma County, California). The goal is to gain a better knowledge of the reservoir porosity, permeability, fracture size, fracture spacing, reservoir discontinuities (leaky barriers) and impermeable boundaries.

  9. 75 FR 8753 - Carolina Power & Light Company, Brunswick Steam Electric Plant, Units 1 and 2; Environmental...

    Science.gov (United States)

    2010-02-25

    ... Dusenbury of the North Carolina Department of Environment and Natural Resources regarding the environmental... & Light Company, Brunswick Steam Electric Plant, Units 1 and 2; Environmental Assessment and Finding of No... identification of licensing and regulatory actions requiring environmental assessments,'' the NRC prepared an...

  10. Models and strategies for electricity distribution companies in emerging economies

    Science.gov (United States)

    Zaragocin Espinosa, Leonardo Vicente

    Unbundling and privatization have become key elements of restructuring in the Electric Power Industry of Emerging Economies. These processes have concentrated on the Generation and Transmission areas, leaving Distribution as lower priority. Based on a comparison between the old role of Distribution Companies (DISCOS) and its new potential role this study identifies the main issues and challenges that DISCOS will face in the new environment once structural and ownership changes are completed. For the specific case of DISCOS in Emerging Economies, regulatory policies are reviewed and strategies identified in order to facilitate the transition and to assist in the integration of DISCOS with other agents in the evolving electric power market. Of particular importance in this research is the analysis of the role of Energy Efficiency (EE) in the new structural and governance environment. A theoretical study of the effects of energy efficiency measures, specifically loss reduction, on price regulation is developed within a proposed regulatory regime of privatization together with Price-Cap Regulation. This theoretical benchmark is then used as a starting point for a case study, the Electric System of Ecuador, where an analysis of the current Ecuadorian price regulation scheme (the Distribution Value Added Charge, VAD, scheme) is presented and analyzed in detail. General recommendations for improving the application of the VAD pricing approach are advanced, with special reference to the current situation in Ecuador.

  11. A three-stage short-term electric power planning procedure for a generation company in a liberalized market

    International Nuclear Information System (INIS)

    Nabona, Narcis; Pages, Adela

    2007-01-01

    In liberalized electricity markets, generation companies bid their hourly generation in order to maximize their profit. The optimization of the generation bids over a short-term weekly period must take into account the action of the competing generation companies and the market-price formation rules and must be coordinated with long-term planning results. This paper presents a three stage optimization process with a data analysis and parameter calculation, a linearized unit commitment, and a nonlinear generation scheduling refinement. Although the procedure has been developed from the experience with the Spanish power market, with minor adaptations it is also applicable to any generation company participating in a competitive market system. (author)

  12. [Tampa Electric Company IGCC project]. 1996 DOE annual technical report, January--December 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-31

    Tampa Electric Company`s Polk Power Station Unit 1 (PPS-1) Integrated Gasification Combined Cycle (IGCC) demonstration project uses a Texaco pressurized, oxygen-blown, entrained-flow coal gasifier to convert approximately 2,000 tons per day of coal to syngas. The gasification plant is coupled with a combined cycle power block to produce a net 250 MW electrical power output. Coal is slurried in water, combined with 95% pure oxygen from an air separation unit, and sent to the gasifier to produce a high temperature, high pressure, medium-Btu syngas with a heat content of about 250 BTUs/cf (HHV). The syngas then flows through a high temperature heat recovery unit which cools the syngas prior to its entering the cleanup systems. Molten coal ash flows from the bottom of the high temperature heat recovery unit into a water-filled quench chamber where it solidifies into a marketable slag by-product. Approximately 10% of the raw, hot syngas at 900 F is designed to pass through an intermittently moving bed of metal-oxide sorbent which removes sulfur-bearing compounds from the syngas. PPS-1 will be the first unit in the world to demonstrate this advanced metal oxide hot gas desulfurization technology on a commercial unit. The emphasis during 1996 centered around start-up activities.

  13. The adaptation of the electric power companies to the power market

    International Nuclear Information System (INIS)

    Otterstad, B.; Ottosen, R.

    1993-02-01

    This report describes the challenges met by the Norwegian electric power companies in adapting to a more market oriented business and their possibilities and strategies when facing the uncertainties on the market side. The main principles of adaptation to the market are described and various strategies are illustrated by means of simple calculations and figures. The theoretical basis for analyses of adaptation to the market and for pricing period contracts and options are discussed. The report concludes with a discussion of the de-regulation of the North American gas market and draws parallels to the Norwegian power market. 17 figs

  14. Development of management systems for nuclear power plant of Hokuriku Electric Power Company

    International Nuclear Information System (INIS)

    Nakamura, Tatsuaki; Hasunuma, Junichi; Suzuki, Shintaro

    2009-01-01

    Hokuriku Electric Power Company has been operating the Shika Nuclear Power Station that it constructed in Shika city, Ishikawa prefecture, for over 15 years since bringing Unit 1 of this plant online in July 1993. In addition to electricity generation, maintenance and inspection tasks constitute a big part of operating a large-scale nuclear power plant, and in recent years, problems at power stations in the nuclear power industry have led to several revisions of nationally regulated maintenance and inspection systems. This paper describes the background, objectives, development method, and features of the Maintenance Management System and Maintenance History Management System that make effective use of information technology to promote safer and more efficient maintenance work at large-scale nuclear power plants. (author)

  15. The Canadian Niagara Power Company story

    International Nuclear Information System (INIS)

    Ball, N.R.

    2005-01-01

    This book chronicles the history and contributions of the Canadian Niagara Power Company and its employees toward the establishment of electricity generation and distribution in Niagara Falls and Fort Erie, Ontario, dating back to its founding in 1892. Through historical photographs, maps and drawings, the book demonstrates the impact of electricity on the Niagara region. It emphasizes the many skills and jobs required to run the company that generated electricity and maintained a complete system to deliver power, metering, and billing services through the depression, wars, and postwar booms, even during lightning, snow and ice storms. The company began producing power in 1905 with what had been the world's largest-capacity turbines and generators that supplied power to both sides of the Niagara River. Initially, most of the electricity was exported to New York State. The company eventually expanded its Canadian customer service area from Niagara Falls, Ontario, to Fort Erie, Bridgeburg, Amigari, Ridgeway, Stevensville, Crystal Beach and Point Abino. Throughout its history, the Canadian Niagara Power Company provided power at a lower cost than its neighbouring competitors. The William Birch Rankine Generating Station became an important tourist attraction, showcasing the latest electrical appliances of the time in an effort to promote the use of electricity in homes and offices. Today, the station remains a tribute to the fact that natural beauty can coincide with industry. The book also chronicles the difficult business challenges caused by restructuring in the electric power industry in the 1990s, repairing aging equipment and applying the latest in automation and remote sensing technology. Today, the company as FortisOntario is expanding to other communities around Ontario. refs., tabs., figs

  16. Development on power distribution technologies of four electric power companies in Japan. The Tokyo Electric Power Co. , Inc

    Energy Technology Data Exchange (ETDEWEB)

    1989-07-01

    Electric power companies have been needed to cope with various needs in accordance with the progress of highly information-oriented society, the improvement of industrial technology, and the advancement and diversification of the living environment. In such situation, the power distribution section of Tokyo Electric Power has promoted technical development, setting up following priority items to put into operation: to reduce power failure caused by works and accidents, to improve reliability in supply, to reduce costs of construction and all over business management, to serve customers to answer various needs, to develop new technology and new methods based on the medium- and long-term prospect, and so forth. Several examples of recent technical development are introduced here. They are as follows; compact equipment and materials for electric poles to match the circumstances of cities and to simplify the construction method for power distribution, a 750kVA large high-voltage power-generation truck to make provision against an emergency such as a disaster by a typhoon, a compact transformer used on the ground, a high-voltage automatic cabinet, and a detector to find the failure of indoor power distribution works in resistances in a short time. 8 figs.

  17. Potential application of radiogenic isotopes and geophysical methods to understand the hydrothermal dystem of the Upper Geyser Basin, Yellowstone National Park

    Science.gov (United States)

    Paces, James B.; Long, Andrew J.; Koth, Karl R.

    2015-01-01

    Numerous geochemical and geophysical studies have been conducted at Yellowstone National Park to better understand the hydrogeologic processes supporting the thermal features of the Park. This report provides the first 87Sr/86Sr and 234U/238U data for thermal water from the Upper Geyser Basin (UGB) intended to evaluate whether heavy radiogenic isotopes might provide insight to sources of groundwater supply and how they interact over time and space. In addition, this report summarizes previous geophysical studies made at Yellowstone National Park and provides suggestions for applying non-invasive ground and airborne studies to better understand groundwater flow in the subsurface of the UGB. Multiple samples from Old Faithful, Aurum, Grand, Oblong, and Daisy geysers characterized previously for major-ion concentrations and isotopes of water (δ2H, δ18O, and 3H) were analyzed for Sr and U isotopes. Concentrations of dissolved Sr and U are low (4.3–128 ng g-1 Sr and 0.026–0.0008 ng g-1 U); consequently only 87Sr/86Sr data are reported for most samples. Values of 87Sr/86Sr for most geysers remained uniform between April and September 2007, but show large increases in all five geysers between late October 2007 and early April, 2008. By late summer of 2008, 87Sr/86Sr values returned to values similar to those observed a year earlier. Similar patterns are not present in major-ion data measured on the same samples. Furthermore, large geochemical differences documented between geysers are not observed in 87Sr/86Sr data, although smaller differences between sites may be present. Sr-isotope data are consistent with a stratified hydrologic system where water erupted in spring and summer of 2007 and summer of 2008 equilibrated with local intracaldera rhyolite flows at shallower depths. Water erupted between October 2007 and April 2008 includes greater amounts of groundwater that circulated deep enough to acquire a radiogenic 87Sr/86Sr, most likely from Archean basement

  18. Descriptive Study of Occupational Accidents and their Causes among Electricity Distribution Company Workers at an Eight-year Period in Iran

    Science.gov (United States)

    Rahmani, Abdolrasoul; Khadem, Monireh; Madreseh, Elham; Aghaei, Habib-Allah; Raei, Mehdi; Karchani, Mohsen

    2013-01-01

    Background Occupational accidents are unplanned events that cause damage. The socio-economic impacts and human costs of accidents are tremendous around the world. Many fatalities happen every year in workplaces such as electricity distribution companies. Some electrical injuries are electrocution, electric shock, and burns. This study was conducted in an electricity distribution company (with rotational 12-hour shift work) in Iran during an 8-year period to survey descriptive factors of injuries. Methods Variables collected included accident time, age of injured worker, employment type, work experience, injury cause, educational background, and other information about accidents. Results Results indicated that most of the accidents occurred in summer, and 51.3% were during shift work. Worker negligence (malpractice) was the cause of 75% of deaths. Type of employment had a significant relationship with type of injuries (p safety was related to job experiences. Temporary workers have no chance to work all year like permanent workers, therefore impressive experiences may be less in them. Because the lack of protective equipment and negligence are main causes of accidents, periodical inspections in workshops are necessary. PMID:24106647

  19. Evaluation of Public Service Electric & Gas Company`s standard offer program, Volume I

    Energy Technology Data Exchange (ETDEWEB)

    Goldman, C.A.; Kito, M.S.; Moezzi, M.M.

    1995-07-01

    In May 1993, Public Service Electric and Gas (PSE&G), the largest investor-owned utility in New Jersey, initiated the Standard Offer program, an innovative approach to acquiring demand-side management (DSM) resources. In this program, PSE&G offers longterm contracts with standard terms and conditions to project sponsors, either customers or third-party energy service companies (ESCOs), on a first-come, first-serve basis to fill a resource block. The design includes posted, time-differentiated prices which are paid for energy savings that will be verified over the contract term (5, 10, or 15 years) based on a statewide measurement and verification (M&V) protocol. The design of the Standard Offer differs significantly from DSM bidding programs in several respects. The eligibility requirements and posted prices allow ESCOs and other energy service providers to market and develop projects among customers with few constraints on acceptable end use efficiency technologies. In contrast, in DSM bidding, ESCOs typically submit bids without final commitments from customers and the utility selects a limited number of winning bidders who often agree to deliver a pre-specified mix of savings from various end uses in targeted markets. The major objectives of the LBNL evaluation were to assess market response and customer satisfaction; analyze program costs and cost-effectiveness; review and evaluate the utility`s administration and delivery of the program; examine the role of PSE&G`s energy services subsidiary (PSCRC) in the program and the effect of its involvement on the development of the energy services industry in New Jersey; and discuss the potential applicability of the Standard Offer concept given current trends in the electricity industry (i.e., increasing competition and the prospect of industry restructuring).

  20. 76 FR 388 - Southern Nuclear Operating Company; Vogtle Electric Generating Plant, Unit Nos. 1 and 2; Notice...

    Science.gov (United States)

    2011-01-04

    ... Operating Company; Vogtle Electric Generating Plant, Unit Nos. 1 and 2; Notice of Consideration of Issuance... Web site http://www.regulations.gov . Because your comments will not be edited to remove any... will not edit their comments to remove any identifying or contact information, and therefore, they...

  1. 78 FR 32384 - South Carolina Electric and Gas Company; Notice Denying Motion to Intervene and Rejecting Request...

    Science.gov (United States)

    2013-05-30

    ... Commission staff's order. \\1\\ South Carolina Elec. and Gas Co., 143 FERC ] 62,041 (2013). Rule 214(b)(2) of... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 516-476] South Carolina... 22, 2013, Commission staff issued an order approving South Carolina Electric and Gas Company's...

  2. Lost in transition? Comparing strategies of electricity companies in Delhi

    International Nuclear Information System (INIS)

    Criqui, Laure; Zérah, Marie-Hélène

    2015-01-01

    This paper examines the notion of energy transition when implemented by private utilities. In 2000, the Delhi government privatized electricity distribution to three private distribution companies. Most research was concerned with the impact of privatization on energy reliability, tariff settings and regulation issues. This paper looks at two under-researched themes: the expansion of services to poorer neighborhoods and the rollout of clean energy policies. This focus allows to unpack the materiality of socio-technical systems, to analyze how energy infrastructures are being technically deployed on the ground and to identify which social approach is used. To detail the specific practices of each company provides a more nuanced and accurate understanding of the reform. In-depth analysis of the three private utilities show that they interpret the reform mandate differently: they use a varied range of technical tools; they respond differently to social concerns in poorer neighborhoods; and they have distinctive internal management choices and corporate cultures. All these four factors can strengthen or undermine the transition towards increased access and clean energy. - Highlights: • Energy transition in an emerging cities aims at balancing environmental and social concerns. • Utilities have distinct transition paths despite similar privatization and regulation framework. • Utilities paths depend on spatial, social, managerial and corporate considerations. • Utilities' strategies are shaped by urban challenges rather than by energy policies

  3. Analytic Hierarchy Process-Based Analysis to Determine the Barriers to Implementing a Material Efficiency Strategy: Electrical and Electronics’ Companies in the Malaysian Context

    Directory of Open Access Journals (Sweden)

    Fu Haw Ho

    2016-10-01

    Full Text Available Material efficiency is one of the most important strategies for helping manufacturing companies achieve sustainability in their production activities. However, there are many barriers to the implementation of material efficiency strategies in the manufacturing processes and overall business operations. The aim of this study is to identify and evaluate the barriers faced by Electrical and Electronics (E&E manufacturing companies in Malaysia in implementing material efficiency strategies. A mixed-mode research method was employed to collect data from these companies. Semi-structured interviews were used to identify the barriers faced by the Malaysian Electrical and Electronics (E&E industry, while an Analytic Hierarchy Process (AHP survey was utilized to determine the importance of each barrier. Seven companies participated in the semi-structured interviews, and 18 companies took part in the AHP survey. Nine barriers were generated from analysis of the interviews, and were then ranked by priority using the AHP method. These important findings could be used as a guide for E&E companies in managing or overcoming barriers during the implementation of material efficiency strategies and other sustainable manufacturing activities.

  4. ESR dating of geyserites from intermittent geyser sites on the Tibetan Plateau

    International Nuclear Information System (INIS)

    Chen, Y.; Feng, J.

    1993-01-01

    Thirteen geyserite samples obtained from two intermittent geyser sites on the Tibetan Plateau were dated by the ESR technique. ESR spectra of geyserite display two sets of signals. One is a set of triplet signals assigned to organic radical X-C-radicalH 2 by Griffiths et al. (1982), another is a mixed signal produced from E'-type defect centres of the silica minerals in geyserite, such as opal, cristobalite, tridymite and quartz. The ages obtained using the mixed E'-type signal are approximately consistent with the stratigraphy and the silica diagenetic sequence. The correlation between the thermal stability of E'-type signal and the mineral association of geyserite was investigated by annealing experiments. (author)

  5. 76 FR 30206 - Southern Nuclear Operating Company, Inc., Vogtle Electric Generating Plant, Unit 1 and 2; Notice...

    Science.gov (United States)

    2011-05-24

    ... Operating Company, Inc., Vogtle Electric Generating Plant, Unit 1 and 2; Notice of Consideration of Issuance..., http://www.regulations.gov . Because your comments will not be edited to remove any identifying or... received from other persons for submission to the NRC inform those persons that the NRC will not edit their...

  6. 76 FR 76153 - Allco Renewable Energy Limited v. Massachusetts Electric Company d/b/a National Grid; Notice of...

    Science.gov (United States)

    2011-12-06

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL12-12-000] Allco Renewable Energy Limited v. Massachusetts Electric Company d/b/a National Grid; Notice of Complaint Take notice... Public Utilities Regulatory Policies Act (PURPA), Allco Renewable Energy Limited filed a formal complaint...

  7. 75 FR 26743 - Pacific Gas and Electric Company; Notice of Environmental Site Review and Technical Meetings To...

    Science.gov (United States)

    2010-05-12

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12779-005] Pacific Gas and Electric Company; Notice of Environmental Site Review and Technical Meetings To Discuss Information and Monitoring Needs for a License Application for a Pilot Project May 5, 2010. a. Type of Application: Draft Pilot License Application. b. Project N...

  8. Low-Q structure related to partially saturated pores within the reservoir beneath The Geysers area in the northern California

    Science.gov (United States)

    Matsubara, M.

    2011-12-01

    A large reservoir is located beneath The Geysers geothermal area, northern California. Seismic tomography revealed high-velocity (high-V) and low-Vp/Vs zones in the reservoir (Julian et al., 1996) and a decrease of Vp/Vs from 1991 to 1998 (Guasekera et al., 2003) owing to withdrawal of steam from the reservoir. I perform attenuation tomography in this region to investigate the state of vapor and liquid within the reservoir. The target region, 38.5-39.0°N and 122.5-123°W, covers The Geysers area. I use seismograms of 1,231 events whose focal mechanism are determined among 65,810 events recorded by the Northern California Earthquake Data Center from 2002 to 2008 in the target region. The band-pass filtered seismograms are analyzed for collecting the maximum amplitude data. There are 26 stations that have a three-component seismometer among 47 seismic stations. I use the P- and S-wave maximum amplitudes during the two seconds after the arrival of those waves in order to avoid coda effects. A total of 8,545 P- and 1,168 S-wave amplitude data for 949 earthquakes recorded at 47 stations are available for the analysis using the attenuation tomographic method derived from the velocity tomographic method (Matsubara et al., 2005, 2008) in which spatial velocity correlation and station corrections are introduced to the original code of Zhao et al. (1992). I use 3-D velocity structure obtained by Thurber et al. (2009). The initial Q value is set to 150, corresponding to the average Q of the northern California (Ford et al., 2010). At sea level, low-Q zones are found extending from the middle of the steam reservoir within the main greywacke to the south part of the reservoir. At a depth of 1 km below sea level, a low-Q zone is located solely in the southern part of the reservoir. However, at a depth of 2 km a low-Q zone is located beneath the northern part of the reservoir. At depths of 1 to 3 km a felsite batholith in the deeper portions of the reservoir, and it corresponds

  9. Report of the Economy, Sustainable Development and Land Planning Commission aiming at authorizing electricity final user and small companies to go back to the electricity regulated price

    International Nuclear Information System (INIS)

    2010-01-01

    This report first presents the French regulated price system by recalling the legal bases for electricity and natural gas pricing, and by describing the progressive process of the electricity and natural gas market opening in France. It outlines that a reversibility principle has been introduced along with regulated pricing in most of the European Union countries. It also comments the complexity created on this issue by successive laws in France, the consequences of the soon coming law on the new organization of the electricity market. Then, the report comments the proposition which aims at authorizing electricity household users and small companies to go back to the regulated electricity price, thereby perpetuating the reversibility principle, while maintaining a criterion of installed electricity power, including natural gas prices and new consumption sites. A table proposes a comparison between existing texts, the present law project and this Commission proposition

  10. Resolution 147/012. It authorize the Central Libertador / SA aeolian generation company to generate an aeolian electricity source by an electric power generating plant located in Maldonado town 4 AA Catastral section, and the Sistema inerconectado Nacional connection

    International Nuclear Information System (INIS)

    2012-01-01

    This decree authorizes the generation of electricity using aeolian energy as the primary electricity source. This project was presented by the 'Libertador / S.A' aeolian generation company with the proposal to install an electrical plant in Maldonado town. This authorization is according to the Electric Wholesale Market regulation

  11. Hydration of the lower stratosphere by ice crystal geysers over land convective systems

    Directory of Open Access Journals (Sweden)

    S. Khaykin

    2009-03-01

    Full Text Available The possible impact of deep convective overshooting over land has been explored by six simultaneous soundings of water vapour, particles and ozone in the lower stratosphere next to Mesoscale Convective Systems (MCSs during the monsoon season over West Africa in Niamey, Niger in August 2006. The water vapour measurements were carried out using a fast response FLASH-B Lyman-alpha hygrometer. The high vertical resolution observations of the instrument show the presence of accumulation of enhanced water vapour layers between the tropopause at 370 K and the 420 K level. Most of these moist layers are shown connected with overshooting events occurring upwind as identified from satellite IR images over which the air mass probed by the sondes passed during the three previous days. In the case of a local overshoot identified by echo top turrets above the tropopause by the MIT C-band radar also in Niamey, tight coincidence was found between enhanced water vapour, ice crystal and ozone dip layers indicative of fast uplift of tropospheric air across the tropopause. The water vapour mixing ratio in the enriched layers exceeds frequently by 1–3 ppmv the average 6 ppmv saturation ratio at the tropopause and by up to 7 ppmv in the extreme case of local storm in coincidence with the presence of ice crystals. The presence of such layers strongly suggests hydration of the lower stratosphere by geyser-like injection of ice particles over overshooting turrets. The pile-like increase of water vapour up to 19 km seen by the high-resolution hygrometer during the season of maximum temperature of the tropopause, suggests that the above hydration mechanism may contribute to the summer maximum moisture in the lower stratosphere. If this interpretation is correct, hydration by ice geysers across the tropopause might be an important contributor to the stratospheric water vapour budget.

  12. A Project Strategic Index proposal for portfolio selection in electrical company based on the Analytic Network Process

    Energy Technology Data Exchange (ETDEWEB)

    Smith-Perera, Aida [Universidad Metropolitana de Caracas, Departamento de Gestion Tecnologica, Caracas 1071, Edo Miranda (Venezuela); Garcia-Melon, Monica; Poveda-Bautista, Rocio; Pastor-Ferrando, Juan-Pascual [Universidad Politecnica de Valencia, Departamento de Proyectos de Ingenieria, Camino de vera s/n 46022 Valencia (Spain)

    2010-08-15

    In this paper a new approach to prioritize project portfolio in an efficient and reliable way is presented. It is based on strategic objectives of the company and multicriteria decision methods. The paper introduces a rigorous method with acceptable complexity which seeks to assist managers of a big Electrical Company of Venezuela to distribute the annual budget among the possible improvement actions to be conducted on the electrical network of Caracas. A total of 15 network improvement actions grouped into three clusters according to the strategic objectives of the company have been analyzed using the Project Strategic Index (PSI) proposed. The approach combines the use of the Analytic Network Process (ANP) method with the information obtained from the experts during the decision-making process. The ANP method allows the aggregation of the experts' judgments on each of the indicators used into one Project Strategic Index. In addition, ANP is based on utility ratio functions which are the most appropriate for the analysis of uncertain data, like experts' estimations. Finally, unlike the other multicriteria techniques, ANP allows the decision problem to be modelled using the relationships among dependent criteria. The participating experts coincided in the appreciation that the method proposed in this paper is useful and an improvement from traditional budget distribution techniques. They find the results obtained coherent, the process seems sufficiently rigorous and precise, and the use of resources is significantly less than in other methods. (author)

  13. A Project Strategic Index proposal for portfolio selection in electrical company based on the Analytic Network Process

    International Nuclear Information System (INIS)

    Smith-Perera, Aida; Garcia-Melon, Monica; Poveda-Bautista, Rocio; Pastor-Ferrando, Juan-Pascual

    2010-01-01

    In this paper a new approach to prioritize project portfolio in an efficient and reliable way is presented. It is based on strategic objectives of the company and multicriteria decision methods. The paper introduces a rigorous method with acceptable complexity which seeks to assist managers of a big Electrical Company of Venezuela to distribute the annual budget among the possible improvement actions to be conducted on the electrical network of Caracas. A total of 15 network improvement actions grouped into three clusters according to the strategic objectives of the company have been analyzed using the Project Strategic Index (PSI) proposed. The approach combines the use of the Analytic Network Process (ANP) method with the information obtained from the experts during the decision-making process. The ANP method allows the aggregation of the experts' judgments on each of the indicators used into one Project Strategic Index. In addition, ANP is based on utility ratio functions which are the most appropriate for the analysis of uncertain data, like experts' estimations. Finally, unlike the other multicriteria techniques, ANP allows the decision problem to be modelled using the relationships among dependent criteria. The participating experts coincided in the appreciation that the method proposed in this paper is useful and an improvement from traditional budget distribution techniques. They find the results obtained coherent, the process seems sufficiently rigorous and precise, and the use of resources is significantly less than in other methods. (author)

  14. IT support of commercial-production companies

    International Nuclear Information System (INIS)

    Hroch, A.

    2004-01-01

    Slovak electricity sector was built from sixties like common entity what can use synergic effects. In the 2002 reorganisation was done, there were created independent joint stock company. There were published new legislative acts, which opened Slovak electricity market for competition. The companies have to change their mine because a business is priority No. 1. Slovenske elektrarne, joint-stock company is under transformation process to build procedural guided trade-production company. As joint project is prepared a new system to control business in to a trading floor, including a risk management, which have to be supported by technological and information tools together with planing, scheduling, directing and controlling of the operation. The all system includes standard modules that fulfil their specific functions. (author)

  15. Zenn Motor Company

    Energy Technology Data Exchange (ETDEWEB)

    Clifford, I. [Zenn Motor Company, Toronto, ON (Canada)

    2010-07-01

    Zenn Motor company is a leader in the electric vehicle space and builds and markets a low speed vehicle known as the zero emission, no noise (ZENN). This presentation provided background information on the Zenn Motor Company as well as on EEStor, a company that develops four-wheeled vehicles and that is seeking partners to fund the development for a modified barium titanate-based ultracapacitor. In 2004, ZENN entered into a technology agreement with EEStor that secured certain exclusive and non-exclusive rights to purchase and deploy EEStor's EESU technology as part of its ZENNergy solutions in several markets, including exclusive rights for new four-passenger vehicles with a curb weight of up to 1,400 kilograms; exclusive rights for the neighbourhood electric vehicles (NEV) and golf carts market; exclusive rights for utility vehicles; and exclusive rights for the aftermarket conversion to ZENNergy of any four-wheeled vehicles. The presentation also addressed ZENNergy and the art of integrating high energy drive solutions. Lessons learned and EEStor's technology attributes were discussed. A hypothetical case study was also offered. The presentation concluded with a discussion of EEStor technology status and opportunity horizons. It was concluded that a better battery is needed to enable the mass adoption of electric vehicles. tabs.

  16. Relative Pricing of Publicly Traded U.S. Electric Utility Companies

    Science.gov (United States)

    Jewczyn, Nicholas Stephen

    In the financial turmoil of 2008, U.S. firms reported debt-ratios that differed from the debt-ratios calculated from balance sheets. The problem is that investors bought common stock expecting initial investment return and lost money when companies delisted. The purpose of this quantitative study was to determine sample securities pricing with the application of synthetic assets and debt accrued. Addressed in the research questions was whether those securities were (a) underpriced compared with return-on-assets (ROA), (b) overpriced compared with ROA, (c) a debt-ratio higher than 60% and also overpriced, (d) underpriced with a synthetic asset added, or (e) related by relative pricing to variant pricing and market capitalization. The study's base theory was Pan's efficient market hypothesis (EMH) of security price prediction of market prices versus model prices. The data from the financial statements of 16 publicly traded U.S. electric utility companies were analyzed via correlations and multiple regression analyses to determine securities pricing and suitability. The findings from the analyses of the sample's variables of market price, book value, market-to-book, and study constructed variables from those variable data were statistically significant. The alternate hypotheses were accepted for all 5 research questions since the analytical operationalization of the hypothetical constructs led to significant relationships. Results suggest that the use of more pricing determinants in securities evaluation may lead to investors losing less money and earning the expected returns for a more efficient capital market, leading to a stronger economy and macroeconomic stability.

  17. Geothermal energy and the land resource: conflicts and constraints in The Geysers-Calistoga KGRA

    Energy Technology Data Exchange (ETDEWEB)

    O' Banion, K.; Hall, C.

    1980-07-14

    This study of potential land-related impacts of geothermal power development in The Geysers region focuses on Lake County because it has most of the undeveloped resource and the least regulatory capability. First, the land resource is characterized in terms of its ecological, hydrological, agricultural, and recreational value; intrinsic natural hazards; and the adequacy of roads and utility systems. Based on those factors, the potential land-use conflicts and constraints that geothermal development may encounter in the region are identified and the availability and relative suitability of land for such development is determined. A brief review of laws and powers germane to geothermal land-use regulation is included.

  18. 75 FR 75704 - Pacific Gas and Electric Company (Diablo Canyon Nuclear Power Plant, Units 1 And 2); Notice of...

    Science.gov (United States)

    2010-12-06

    ... NUCLEAR REGULATORY COMMISSION [Docket Nos. 50-275-LR; 50-323-LR] Pacific Gas and Electric Company (Diablo Canyon Nuclear Power Plant, Units 1 And 2); Notice of Appointment of Adjudicatory Employee... Seismologist, Office of Nuclear Material Safety and Safeguards, has been appointed as a Commission adjudicatory...

  19. Preliminary report on the Pacific Gas and Electric Company's notice of intention to seek certification for Geysers Unit 16 (78-NOI-6)

    Energy Technology Data Exchange (ETDEWEB)

    1979-01-01

    The preliminary findings of fact and conclusion adopted by the Commission Committee are presented. Also, a description of the proposed project, a summary of the proceedings to date, and local, state, and federal government agency comments on the proposal are included. Preliminary findings and conclusions are presented on: (a) conformity to the forecast of statewide and service area electric power demands; (b) the degree to which the proposed site and facility conform with applicable local, regional, state, and federal standards, ordinances and laws; (c) the safety and reliability of the facility; and (d) the relative merit of the proposed transmission line corridors. (MHR)

  20. Electricity supply

    International Nuclear Information System (INIS)

    Rezendes, V.S.

    1991-10-01

    This report focuses on the Securities and Exchange Commission's (SEC) administration of the Public Utility Holding Company Act of 1935, intended to protect the public, investors, and consumers from abuses associated with the control of electric and gas utility companies through the holding company structure. These abuses include subjecting subsidiary utilities to excessive charges for services, construction work, and materials; frustrating effective state regulation through the holding company structure; and overloading subsidiary utilities with debt to prevent voluntary rate reductions. GAO discusses industry changes during the past decade involving electric utility holding companies; SEC's regulatory response to such changes; and the relationship between SEC, the Federal Energy Regulatory Commission, and states in protecting consumer and investor interests in light of these changes

  1. Slovak Electric, Plc., 1997

    International Nuclear Information System (INIS)

    1997-06-01

    Slovenske elektrarne, a.s. (Slovak Electric, Plc.) was established on November 1, 1994 as one entity among new entities created as successors to the former Slovensky energeticky podnik. The subject activity is the generation of electric power, operation of transmission 220 kV and 400 kV systems, transit, import, export, and sales of electric power. Besides these activities the company deals with generation, distribution, and sales of heat. The company operates one nuclear power station, three thermal power plants, and thirty hydro power plants. One nuclear Power plant is under construction (state up tu June 1997). On this CD ROM next chapters are presented: (1) The structure of the company; (2) The production Units; (3) The economic power of the company; (4) The operation culture of the company; (5) The strategic plans of the company

  2. Interaction in the large energetic companies in the Republic of Macedonia

    International Nuclear Information System (INIS)

    Janevski, Risto

    1999-01-01

    After disintegration of former power energetic system of Yugoslavia 1991, the Republic of Macedonia has faced enormous problems in the energetic field. It was necessary to realize all options in order to secure enough electric power for normal economic capacities function. In that course a direct involvement of five large companies, which represent very significant energetic subjects, will largely determine the future energetic conditions and circumstances in our country. These are the following companies: P.E. Electric Power Company Of Macedonia; OKTA Crude Oil Refinery; Heat Power Company; HEK Jugohrom; Fenimak. The paper presents the electric power consumption of these macro energetic companies during the period 1991-1998

  3. 17 CFR 250.7 - Companies deemed not to be electric or gas utility companies.

    Science.gov (United States)

    2010-04-01

    ... status afforded by paragraph (b)(1) of this section, any such company shall file with this Commission a... a statement of receipts and expenditures for such year and of financial status at its end. (3) As a prerequisite to retaining the status afforded by paragraph (b)(1) of this section, any such company shall...

  4. Scottish Nuclear, the company

    International Nuclear Information System (INIS)

    Yeomans, R.M.

    1991-01-01

    A former chief executive of Scottish Nuclear, formed when United Kingdom electricity generation was privatized, describes the financial viability of the company and considers the future of nuclear power. Scottish Nuclear owns and operates the Advanced Gas Cooled (AGR) and Magnox reactors at Hunterston and the AGR reactor at Torness and is a separate company from those dealing with hydro-electric and non-nuclear generation of electricity. Costs of running the reactors is identified as a proportion of the whole for certain key issues such as station costs, depreciation, decommissioning and insurance. While nuclear power generation using outmoded Magnox reactors is costly, the ecological cost of global warming is seen as more of a problem. Future policy for nuclear power in Scotland must include new plant, probably pressurized water reactors and a clear policy of safety enhancement. (UK)

  5. A study of the contract terms offered by the regional electricity companies to generators of renewable energy outside the NFFO

    International Nuclear Information System (INIS)

    Williams, N.C.; Limbrick, A.J.

    1996-01-01

    The aim of this study was to review the terms and conditions of contract for the purchase of renewable energy currently offered by the Regional Electricity Companies (RECs) outside the Non-Fossil Fuel Obligation (NFFO), through consultation with electricity generators. It focused on projects contracted under the first and second tranches of the NFFO, and those which have been developed outside this support mechanism (both renewable and fossil-fuelled), but which are characterised by being ''embedded'' in the RECs' distribution networks. (UK)

  6. Setting up charging electric stations within residential communities in current China: Gaming of government agencies and property management companies

    International Nuclear Information System (INIS)

    Wu, Tian; Ma, Lin; Mao, Zhonggen; Ou, Xunmin

    2015-01-01

    The difficulty of charging electric vehicles (EVs) is now hindering their further development. Governments generally choose to build stations for home charging (including piles) within residential communities. Given the conflict of interest between various government agencies and property management companies, constructing a charging station within residential communities would result in welfare loss for the property management companies and therefore lead to the principal–agent problem. This paper constructs a two-period imperfect information game theory model to study the moral hazard involved in this issue and government agencies' optimal choice. In the analytic solution of the model, we find that the optimal choice for a farsighted government agency is to constantly improve the incentive mechanism and introduce charging stations only when the conflict of interest is eliminated. Any benefits derived from government regulations by force would prove short-lived. The government should focus on long-term returns in the development of EVs, and its optimal mechanism should be designed to mitigate the principal–agent problem of property management companies, thereby accelerate the progress of EV charging infrastructure and improve overall social welfare. - Highlights: • The charging of electric vehicles (EVs) is hindering their use. • A game theory model is used for analysis of EV charging station construction. • Charging stations are in residential communities in China. • Government agencies are constantly improving incentive mechanisms

  7. Measures taken by electric power companies for the accident at JCO

    International Nuclear Information System (INIS)

    Taniguchi, Kazufumi

    2000-01-01

    Activities for the JCO accident were done by 700 electric company personnel/day at the maximum, who were mainly the experts of radiation management and were from the whole Japanese regions. The major activities were as follows. Monitoring of body surface contamination of people at the refuge, which was done on request from Tokaimura, showed no radioactive contamination over detection limit. Activities based on the request from the national counter-planning headquarters involved environmental monitoring, which only showed the higher ambient dose rate than usual at the boundary of JCO site. Monitoring of toy equipments in kindergartens and primary and junior schools showed no contamination over detection limit. Measurement of dose equivalent of the personnel showed 0.0 mSv exposure by γ-, β-ray and neutron. In summary, questions and requests raised by people mainly concerned the influence of radiation exposure. (K.H.)

  8. Performance of the Electric power companies of Burkina Faso, the Ivory Coast, Mali and Senegal, and their organizational models

    International Nuclear Information System (INIS)

    Girod, J.

    1993-01-01

    The history of the technical, economic, and financial performances of these four countries' power companies over the past two decades is recounted, and then interpreted as the result of the existing organizational models. The changes that have occurred can be understood in long-term perspective by comparing the performance of these companies to the characteristics, rules, and objectives used to define the models, which also helps explain the history of performance indicator variations. Two models are defined: one for the physical plant and one for the management. These correspond to two successive phases in the organization and operation of the electrical sector. Rural electrification and regional interconnection will be important factors in any new model or models developed for the future, because the forms they take is likely to modify the characteristics of these national power companies. 26 refs., 1 fig., 3 tabs

  9. Electric Car Special

    Energy Technology Data Exchange (ETDEWEB)

    Zoethout, T.; Belin, H.; Verwijs, H.; Nicola, S.; De Saint Jacob, Y.; Gatermann, R.

    2009-09-15

    In six articles, two columns and two interviews a part of this issue is dedicated to electric car developments: about winners and losers in the electric car race; a unique business model to rolling out the electric car by the electric battery company Better Place and the automobile industry Renault Nissan; interview with entrepreneur Shai Agassi of the Indian company Better Place; the development of electric cars in Germany; interview with Jean-Jacques Chanaron, an economist specialising in innovation management and a firm believer in electric cars; start of mass production of electric vehicles at the Japanese Nissan automobile industry; the constraints in Sweden in developing fuel-efficient automobiles; plans for 1 million electric or hybrid cars by 2025 in the Netherlands.

  10. Greengrid Electric

    International Nuclear Information System (INIS)

    Argue, D.

    1998-01-01

    This presentation focused on what customers want from a competitive electricity market and what motivates customers to choose a renewable energy product and service. Greengrid Electric, a subsidiary of Enershare Technology Corp., intends to provide the green electricity that they believe customers have wanted for some time. Enershare and Greengrid have been active participants in the electricity restructuring process in Ontario, and have provided input to the Market Design Committee. Once licensed as a retailer, Greengrid intends to be the major provider of green electricity in Ontario. The company will supply a 100 per cent renewable energy product to their wholesale and retail customers. The company is confident that there is a significant niche market in Ontario for selling a green product that has a blend of wind, small hydro (run-of-river or existing dam), solar, and for energy produced from capturing methane gas from municipal landfill sites. Company officials are confident that customers will be willing to pay a premium price for energy if their purchases will lead to environmental improvement

  11. Gas supply and Yorkshire Electricity

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    1995-04-01

    Yorkshire Electricity, among other independent suppliers of gas, now competes for a share of the United Kingdom gas market, previously monopolised by British Gas. The experience of this successful electric utility company, expanding into the industrial and domestic gas supply market is described in the article. The company`s involvement stems partly from the fact that significant volumes of gas are landed at three terminals within its franchise area. The company will also seek to use subsidaries to generate electric power from gas turbine power plants and explore the possibilities of developing combined heat and power (CHP) plants where appropriate. (UK)

  12. National Account Energy Alliance Final Report for the Basin Electric Project at Northern Border Pipeline Company's Compressor Station #7, North Dakota

    Energy Technology Data Exchange (ETDEWEB)

    Sweetzer, Richard [Exergy Partners Corp.; Leslie, Neil [Gas Technology Institute

    2008-02-01

    A field research test and verification project was conducted at the recovered energy generation plant at Northern Border Pipeline Company Compressor Station #7 (CS#7) near St. Anthony. Recovered energy generation plant equipment was supplied and installed by ORMAT Technologies, Inc. Basin Electric is purchasing the electricity under a purchase power agreement with an ORMAT subsidiary, which owns and operates the plant.

  13. CNG: Aiming to be an energy company, not a gas company

    International Nuclear Information System (INIS)

    Wheatley, R.

    1997-01-01

    Long before regulatory changes in the US paved the way for the union of natural gas and electric utility companies, Consolidated Natural Gas Co. (CNG) embarked on a strategy that would serve the company well in the 1990s. In 1995, CNG began a corporate repositioning to meet mounting competition, switching emphasis from its regulated businesses to the non-regulated side. The goal: to become an energy player, not only in the US but internationally. This paper focuses on the company's operations, business plans, and management strategies. The paper gives an overview, then discusses production of oil and gas, the growing exploration program and plans for the future

  14. Do distribution companies loose money with an electricity flexible tariff?: A review of the Chilean case

    International Nuclear Information System (INIS)

    Vera, Sonia; Bernal, Felipe; Sauma, Enzo

    2013-01-01

    We can get an (energy efficiency) EE improvement if we produce a flatter daily load curve, leading to a higher efficiency of the power system, making better use of the generation and transport electricity chain, thus avoiding over-investment in equipment used just few hours a year. Tariff flexibility of the (Time of Use) TOU type is one of these measures. Generally, TOU systems are designed to minimize total system cost, which may cause losses in distribution companies (DISCOs), generating opposition. On the contrary, the present paper proposes a TOU system for electricity consumption in Chile where optimal prices are obtained in order to maximize total income of DISCOs. In this manner, the proposed TOU system is, by definition, beneficial for DISCOs and it may lead to a win–win situation among DISCOs and consumers. In particular, we show that such a system, implemented in a country like Chile, would allow for DISCOs a total potential benefit of 811.7 millions of dollars for the 3-year study period (2005–2007), considering initiatives that promote a 5% savings in real consumption during on-peak hours, obtained by the spread or difference between the proposed and the current systems. - Highlights: • We propose a TOU (Time of Use) system for electricity consumption in Chile. • In this system the optimal prices are obtained in order to maximize total income of (distribution companies) DISCOs. • The proposed TOU system may lead to a win–win situation among DISCOs and consumers. • This system, implemented in a country like Chile, would allow for DISCOs a total potential benefit of M$811.7. • Benefit obtained for 3-year study period with initiatives that promote 5% savings in real consumption during on-peak hours

  15. A comparison of long-term changes in seismicity at The Geysers, Salton Sea, and Coso geothermal fields

    Science.gov (United States)

    Trugman, Daniel T.; Shearer, Peter M.; Borsa, Adrian A.; Fialko, Yuri

    2016-01-01

    Geothermal energy is an important source of renewable energy, yet its production is known to induce seismicity. Here we analyze seismicity at the three largest geothermal fields in California: The Geysers, Salton Sea, and Coso. We focus on resolving the temporal evolution of seismicity rates, which provides important observational constraints on how geothermal fields respond to natural and anthropogenic loading. We develop an iterative, regularized inversion procedure to partition the observed seismicity rate into two components: (1) the interaction rate due to earthquake-earthquake triggering and (2) the smoothly varying background rate controlled by other time-dependent stresses, including anthropogenic forcing. We apply our methodology to compare long-term changes in seismicity to monthly records of fluid injection and withdrawal. At The Geysers, we find that the background seismicity rate is highly correlated with fluid injection, with the mean rate increasing by approximately 50% and exhibiting strong seasonal fluctuations following construction of the Santa Rosa pipeline in 2003. In contrast, at both Salton Sea and Coso, the background seismicity rate has remained relatively stable since 1990, though both experience short-term rate fluctuations that are not obviously modulated by geothermal plant operation. We also observe significant temporal variations in Gutenberg-Richter b value, earthquake magnitude distribution, and earthquake depth distribution, providing further evidence for the dynamic evolution of stresses within these fields. The differing field-wide responses to fluid injection and withdrawal may reflect differences in in situ reservoir conditions and local tectonics, suggesting that a complex interplay of natural and anthropogenic stressing controls seismicity within California's geothermal fields.

  16. El Paso Electric Company Diablo Substation to the US-Mexico border 115kV transmission line project. Final Environmental Assessment

    Energy Technology Data Exchange (ETDEWEB)

    1992-04-01

    This Environmental Assessment documents the analysis of alternative corridors for development and operation of a proposed 115 kilovolt transmission line using private lands and transporting power to the US-Mexico international border. The project will require (1) an amendment to El Paso Electric Company`s existing export authorization to transfer power across this border, and (2) a Presidential Permit for construction of the transmission line. The project would be located in Dona Ana county in southern New Mexico, approximately five miles west of El Paso, Texas. The alternative corridors, specific locations within those corridors, and structure types are identified and analyzed in the environmental studies.

  17. The internationalization of the electricity industry

    International Nuclear Information System (INIS)

    Gulli, F.; Indigenti, S.; Ninni, A.

    1998-01-01

    During the last years the evolution of the electricity industry has been featured by a marked development of the internationalization processes. Several companies started huge foreign investment programmes; construction of power plants; acquisition of generation, distribution and integrated companies. The goal of this study is to analyse the determinants in the internationalization process of the world electricity industry. This topic is introduced in the first, part with a hint on the main theoretical contributions regarding the companies internationalization. In the second part, an attempt is made to define the size of the phenomenon adopting the results yielded by a detailed inquiry about the international strategies of the leading electric companies. In the third part, an econometric analysis, referring to a significant sample of electric companies, is aimed at identifying the main determining factors affecting the international development is mainly due to both organization and regulation of the single national markets [it

  18. Additional costs for Norwegian power companies from the OED-proposed implementation of the Electricity Directive II; Merkostnader for norske kraftselskaper ved OEDs forslag til implementering av Eldirektiv II

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-07-01

    The cost-related consequences for Norwegian vertically integrated power companies caused by the proposed implementation of Electricity Directive II by OED (Norwegian Oil and Energy Department) are considered. Electricity Directive II demands a company and functional division between the network activities and the activities exposed to competition. The OED proposition aims at lowering the limit for which network companies are included by the new demands, from 100.000 to either 20.000 or 10.000 network clients. Moreover, they propose measures that ensure the network companies' independence, and these exceed by far the minimum requirements of Electricity Directive II. The additional costs may be significant in some aspects. Especially the requirement of an independent management in parent- and subsidiary company will lead to added costs of about Nok 320 million for the Norwegian power business. Further, a split-up management structure may be poorly compatible with the mind set behind the corporate model, something which potentially can lead to bad investments or a weaker utilization of potential cost synergies. The motive for proposing stricter demands on Norwegian power business is among other to limit cross-subsidies so that the competition in the market is reinforced. In light of substantial, quantified additional costs and other negative effects, the proposition's effect on the competition should be investigated further, including alternative measures that may be more cost-effective and/or more accurate (ml)

  19. An optimization model for natural gas supply portfolios of a power generation company

    International Nuclear Information System (INIS)

    Jirutitijaroen, Panida; Kim, Sujin; Kittithreerapronchai, Oran; Prina, José

    2013-01-01

    Highlights: ► An optimization model for daily operation of a natural gas-fired generation company is proposed. ► The model considers uncertainties in electricity price and natural gas price. ► The model is formulated to capture the hedging decisions by the company. ► The solution yields quantities of natural gas, generating schedule and purchasing quantities of electricity. ► Higher profit can be achieved by adapting inventory and production to the actual spot prices of natural gas and electricity. - Abstract: This paper considers a deregulated electricity market environment where a natural gas-fired generation company can engage in different types of contracts to manage its natural gas supply as well as trade on the electricity market. If the contracts are properly designed, they can protect the company from fluctuations in electricity price and demand, at some cost to the company’s expected profit. This reduction in profit can be mitigated by trading on the natural gas and electricity spot markets, but this trading activity may also sometimes result in losses. A stochastic programming model is formulated to capture the hedging decisions made by the company, as well as the interactions between the natural gas and electricity markets. The benefits offered by this approach for profit maximization in a variety of business scenarios, such as the case where the company can hold some amount of gas in storage are studied and presented. It is found that the stochastic model enables the company to optimize the electricity generation schedule and the natural gas consumption, including spot price transactions and gas storage management. Several managerial insights into the natural gas market, natural gas storage, and distribution profit are given

  20. The adaptation of the major network companies to the liberalization of the electricity in Europe: comparison between France and Germany

    International Nuclear Information System (INIS)

    Courivaud, H.

    2001-01-01

    The liberalization of network activities is a factor which is now topical within France, Europe and the rest of the world. The main economic thinking at the dawn of the 21. century is full of praise for the emergence of heightened competition, which ensures optimal allocation of investments within the electricity industry, brings down prices for the benefit of both minor and major consumers alike, and finally stimulates innovation and creativeness on the part of companies. Curiously, it seems to overlook the fact that the staged introduction of monopolies and the establishment of exclusive rights in favour of certain operators several decades ago offered all of the same economic advantages. In addition to this, it rarely mentions the political and social effects of such changes, as if the latter are the subject of some major consensus within the public opinion. Whatever the circumstances, as a result of globalization, the major electricity network companies have decided either by themselves or following recommendations by the legislators to internationalize and to carry out acquisitions, enhancing market forces which up to the present remained latent. In Europe, this adaptation is not uniform in nature however. It needs to take full account of national and international characteristics regarding the economic and social organisation of the Member States of the European Union, and should certainly not be allowed to sidestep certain democratic requirements and the observance of basic rights other than those related to the freedom to do business. These include respect for the environment, consultation with the social partners within the company and outside, respect for the rights of consumers' and in particular those without any power in the marketplace, not to mention respect for the dignity of those involved in social life. The necessity of reconciling the new opportunities for open competition created through liberalization and respect for basic rights does not seem

  1. Formaldehyde as a carbon and electron shuttle between autotroph and heterotroph populations in acidic hydrothermal vents of Norris Geyser Basin, Yellowstone National Park

    Energy Technology Data Exchange (ETDEWEB)

    Moran, James J.; Whitmore, Laura M.; Isern, Nancy G.; Romine, Margaret F.; Riha, Krystin M.; Inskeep, William P.; Kreuzer, Helen W.

    2016-03-19

    The Norris Geyser Basin in Yellowstone National Park contains a large number of hydrothermal systems, which host microbial populations supported by primary productivity associated with a suite of chemolithotrophic metabolisms. We demonstrate that Metallosphaera yellowstonesis MK1, a facultative autotrophic archaeon isolated from a hyperthermal acidic hydrous ferric oxide (HFO) spring in Norris Geyser Basin, excretes formaldehyde during autotrophic growth. To determine the fate of formaldehyde in this low organic carbon environment, we incubated native microbial mat (containing M. yellowstonensis) from a HFO spring with 13C-formaldehyde. Isotopic analysis of incubation-derived CO2 and biomass showed that formaldehyde was both oxidized and assimilated by members of the community. Autotrophy, formaldehyde oxidation, and formaldehyde assimilation displayed different sensitivities to chemical inhibitors, suggesting that distinct sub-populations in the mat selectively perform these functions. Our results demonstrate that electrons originally resulting from iron oxidation can energetically fuel autotrophic carbon fixation and associated formaldehyde excretion, and that formaldehyde is both oxidized and assimilated by different organisms within the native microbial community. Thus, formaldehyde can effectively act as a carbon and electron shuttle connecting the autotrophic, iron oxidizing members with associated heterotrophic members in the HFO community.

  2. Resolution 148/012. It authorize the 'Central Libertador / SA aeolian generation' company to generate an aeolian electricity source by an electric power generating plant located in Lavalleja town 1 AA catastral section and in Maldonado town 4 AA Catastral section, and the 'Sistema inerconectado Nacional' connection

    International Nuclear Information System (INIS)

    2012-01-01

    This decree authorizes the generation of electricity using aeolian energy as the primary electricity source. This project was presented by the 'Libertador / S.A' aeolian generation company with the proposal to instal an electrical plant in Lavalleja town. This authorization is according to the Electric Wholesale Market regulation

  3. Design of Technical Support System for Retail Company Based on Cloud

    Directory of Open Access Journals (Sweden)

    Shao Ping

    2017-01-01

    Full Text Available With the retail side of the market in China, the sale of electricity companies as a new source of power retail, they participate in the electricity market business. National and local governments subsequently introduced the corresponding policies and rules, the technical support system becomes one of the necessary conditions for the access of the retail company. Retail electricity companies have started the system construction, but has not yet formed a standardized, complete architecture. This paper analyzes the business and data interaction requirements of retail electricity companies, and then designs the functional architecture based on basic application, advanced application and value-added application, and the technical architecture based on “cloud”. On this basis, the paper discusses the selection of private cloud, public cloud and mixed cloud model, and the rationalization suggestion of system construction. Which can provide reference for the construction of the technical support system of the domestic retail enterprises.

  4. Prices on electricity and transmission of electricity

    International Nuclear Information System (INIS)

    2003-01-01

    This publication contains data on prices of electric energy and transmission of electricity valid from 1 January 2003. The purpose is to illustrate the price changes on the electricity market in terms of prices for different customer categories. All companies holding network concessions for areas and all companies trading in electricity are included in this report, which is produced on an annual basis.The prices for transmission services 1 January 2003 were on the whole unchanged compared to the preceding year. For households the mean annual cost was SEK 882 for flats, SEK 4 335 for one- or two-family houses with electric heating and SEK 1 925 for those without electric heating. Electricity prices rose considerably on 1 January 2003 compared to the year before. The mean price per kWh for households with standard agreements was SEK 0.519 for deliveries to flats, SEK 0.447 for one- or two-family houses with electric heating and SEK 0.471 without electric heating. As a result, the mean annual cost increased by SEK 326 for flats, SEK 3 012 for one- or two-family houses with electric heating, and by SEK 774 for those houses without electric heating. The high costs of electricity may be explained in part by the development on the Nordic Power Exchange (Nord Pool), where the spot price increased by about 290 per cent during 2002 (1 USD is about 8 SEK)

  5. Early site review report for the Sundesert site, San Diego Gas and Electric Company. Project No. 558

    International Nuclear Information System (INIS)

    1977-01-01

    The purpose of the report is to present the Nuclear Regulatory Commission's evaluation of several of the matters relating to the suitability of the Sundesert site near Blythe, California, on which the San Diego Gas and Electric Company proposes to build the Sundesert Nuclear Plant, Units 1 and 2. The report summarizes the results of the technical evaluation of the suitability of the proposed Sundesert site for a nuclear plant and delineates the scope of the technical matters considered in evaluating the suitability of the site

  6. Electricity and gas conference - a customer's perspective

    International Nuclear Information System (INIS)

    Timmons, P.S.

    1997-01-01

    Sterling Pulp Chemicals (SPC) is one of only a few companies in the world supplying both technology and chemicals for pulp bleaching. The company's electricity consumption represents more than 60 per cent of operating costs. The company regards energy as a commodity and considers electricity and gas as interchangeable energy sources. The deregulation of electrical markets in North America is following the trend set in the gas industry. SPC, as all other companies, is interested in having both gas and electricity delivered at lower costs. Options available to industrial consumers such as self-generation, purchase of either electricity or gas, use of financial instruments, etc., were explored. It was suggested that as a nation we must move quickly towards lower energy costs, with definite goals and timetables, to avoid having changes forced upon us by by external forces

  7. Forecasted electric power demands for the Delmarva Power and Light Company. Volume 1 and Volume 2. Documentation manual

    International Nuclear Information System (INIS)

    Estomin, S.L.; Beach, J.E.

    1990-10-01

    The two-volume report presents the results of an econometric forecast of peak load and electric power demands for the Delmarva Power and Light Company (DP ampersand L) through the year 2008. Separate sets of models were estimated for the three jurisdictions served by DP ampersand L: Delaware, Maryland and Virginia. For both Delaware and Maryland, econometric equations were estimated for residential, commercial, industrial, and streetlighting sales. For Virginia, equations were estimated for residential, commercial plus industrial, and streetlighting sales; separate industrial and commercial equations were not estimated for Virginia due to the relatively small size of DP ampersand L's Virginia Industrial load. Wholesale sales were econometrically estimated for the DP ampersand L system as a whole. In addition to the energy sales models, an econometric model of annual (summer) peak demand was estimated for the Company

  8. Shutdown risk management applied at Philadelphia Electric Company

    International Nuclear Information System (INIS)

    Dagan, William J.; True, Douglas E.; Wilson, Thomas; Truax, William

    2004-01-01

    The development and implementation of an effective risk management program requires basic risk or safety knowledge and the conversion of such information into effective management tools. ERIN Engineering and Research, Inc., under contract to the Electric Power Research Institute, has developed an effective program. Outage Risk Assessment and Management (ORAM), to provide plant and management personnel with understandable results of shutdown risk studies. With this tool, the impact of plans and decision options can be readily determined and displayed for the decision maker. This paper describes these methods and their application to the Limerick Nuclear Station of Philadelphia Electric Company. It also sets forth a broader application of these methods to include support of management decisions at-power and following forced outages. The result is an integrated risk management framework which can allow management and technical personnel to utilize readily available and understandable risk insights to optimize each activity. This paper addresses the resolution of several key issues in detail: How was the ORAM risk management method employed to represent the existing plant shutdown procedures and policies? How did the ORAM risk management method enhance the decision-making ability of the outage management staff? How was the ORAM software efficiently integrated with the outage scheduling software? How is quantitative risk information generated and used for outage planning and control? The ORAM risk management philosophy utilizes a series of colors to depict various risk configurations. Each such configuration has associated with it clear guidance. By modifying the conditions existing in the plant it is possible to impact the type of risk being encountered as well as the guidance which is appropriate for that period. In addition, the duration of a particular configuration can be effectively managed to reduce the overall risk impact. These are achieved with minimal

  9. Progress of innovation of electrical power technology in FY2013

    International Nuclear Information System (INIS)

    Mayumi, Akihiko; Tanaka, Masanori; Yamaguchi, Hiroshi

    2014-01-01

    The following is the description of technical innovations at 12 companies including Tokyo Electric Power Company, Chubu Electric Power Company, and Japan Atomic Power Company. Tokyo Electric Power Company presented (1) the developments of a wet-type air decontaminating apparatus for inside/outside of power plant, (2) a robot to be used for field investigation at the Fukushima Daiichi nuclear power plant, (3) a visualization technology using laser for detection, and (4) removal of debris at the power plant. Chubu Electric Power Company presented application of a flap gate to the opening on exterior wall of building as a countermeasure against tsunami at the Hamaoka nuclear power plant. Hokuriku Electric Power Company presented a nuclear reactor operation training simulator for full-scope operation training for the Shika nuclear power station. Chugoku Electric Power Company presented their efforts in implementing a predictive monitoring system at the Shimane Nuclear Power Station. Shikoku Electric Power Company presented the installation of a weir with a flap gate to the interior of seawater pit as a countermeasure against tsunami. Japan Atomic Power Company presented an impact assessment method of fallout during transportation of materials caused by nuclear reactor accident, design and development of a square-type shielding container for radioactive wastes, a strength test on concrete materials for the safety design of Tsuruga Power Station Units 3 and 4, decommissioning of nuclear power plant, and research and development of the fast breeder reactor. (S.Y.)

  10. REC profile 2: Southern Electric

    International Nuclear Information System (INIS)

    Anon.

    1995-01-01

    A review is presented of South Electric plc, one of the United Kingdom's Regional Electricity Companies (RECs), at present distributing electric power in central southern England. Known in financial markets as an efficient performer, the staff reductions and changes of employment conditions undertaken to achieve this end are described. The need to maintain success in its core business, while simultaneously seeking diversification, drive the company's keen competitive edge. The relationship between the RECs and the electricity regulator is also explored, as Southern Electric considers a friendly merger with another REC to improve its market competitiveness in price terms. (UK)

  11. Safety evaluation report: related to the operation of Perry Nuclear Power Plant, Units 1 and 2, Docket Nos. 50-440 and 50-441, Cleveland Electric Illuminating Company

    International Nuclear Information System (INIS)

    1982-08-01

    Supplement No. 1 to the Safety Evaluation Report on the application filed by the Cleveland Electric Illuminating Company on behalf of itself and as agent for the Duquesne Light Company, the Ohio Edison Company, the Pennsylvania Power Company, and the Toledo Edison Company (the Central Area Power Coordination Group, CAPCO), as applicants and owners, for a license to operate the Perry Nuclear Power Plant, Units 1 and 2 (Docket Nos. 50-440 and 441). The facility is located near Lake Erie in Lake County, Ohio. This supplement has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission and reports the status of certain items that had not been resolved at the time of publication of the Safety Evaluation Report

  12. Prices on electricity and transmission of electricity

    International Nuclear Information System (INIS)

    2002-01-01

    This publication contains data on prices of electric energy and transmission of electricity valid on 1 January 2002. The purpose is to illustrate the price changes on the electricity market in terms of prices for different customer categories. All companies holding network concessions for areas and all companies trading in electricity are included in this report, which is produced on an annual basis. The prices for transmission services 1 January 2002 were on the whole unchanged compared to the preceding year. For households the mean annual cost was SEK 856 for flats, SEK 4,194 one- or two-family houses with electric heating and SEK 1,881 without electric heating. (1 SEK ∼ 0.1 USD). Electricity prices rose considerably on 1 January 2002 compared to the year before. The mean price per kWh for households according to standard agreement was SEK 0.356 for deliveries to flats, SEK 0.296 for apartments in one- or two-family houses with electric heating and SEK 0.316 without electric heating. That means that the mean annual cost increased by SEK 171 for flats. For one- or two-family houses with electric heating, costs increased by SEK 1,424, and by SEK 379 for those houses without electric heating. The high costs of electricity may be explained in part by the development on the Nordic Power Exchange (Nord Pool), where the spot price increased by 75 per cent during 2001. The price development for household customers during 1996-2002 is shown in a diagram

  13. Advance in technologies of electric power in 2008

    International Nuclear Information System (INIS)

    Hamada, Kenichi; Maekawa, Fumiaki; Nakamura, Akio

    2008-01-01

    Ten electric power companies and two related companies reported their advance in technologies. The technologies of nuclear power plants were stated by ten companies, which consisted of introduction of new main control board to Tomari-3 in Hokkaido Electric Power Co., Inc., reduction methods of exposure dose of Higashidori-1 in Tohoku Electric Power, hot water based two-phase flow testing device for pipe thinning test by Tokyo Electric Power Company, Guideline for prevention of piping damage caused by combustion of mixture gases in BWR (the second edition) published by Thermal and Nuclear Power Engineering Society, setting up distributor in the low-pressure turbine of Shika-2 in Hokuriku Electric Power Company, development of rapid estimation method of release radioactivity and application of high density neutron source to nuclear transmutation of nuclear fuel cycle and introduction of new core monitor system by The Kansai Electric Power Co., Inc., upgrade of investigation of the effects of hot waste water and development of detector for dropout parts of cooling system in reactor by Shikoku Electric Power Co., Inc., change of transformer in Sendai-1 by Kyushu Electric Power Co., Inc., and reactor core design for Oma ABWR by J-Power. The Japan Atomic Power Company reported four articles such as development of technologies for established nuclear power plants, promotion of Tsuruga-3 and Tsuruga-4, application of clearance system in Japan and development of future reactors. (S.Y.)

  14. Slovak Electric, Plc., 1998

    International Nuclear Information System (INIS)

    1997-06-01

    Slovenske elektrarne, a.s. (Slovak Electric, Plc., abbrevation 'SE, a.s.') is the Slovak electricity generating utility, incorporated on November 1, 1994 as one of new companies formed from substantially all of the assets and a legal successor of Slovensky energeticky podnik, s.p., founded on January 1, 1969 in the form of SEP group. From its predecessor, Slovak Electric, Plc., took over generation of power, operation of 220 kV and 400 kV power system, transit, import, export, and sale of electricity. It is also involved in generation, distribution, and sale of heat. At present, SE's share of electriciry sales in the Slovak Republic is 88.47%. Electricity is delivered to three regional distribution companies and directly to several major industrial enterprises. SE, a.s. operates one nuclear power station, three thermal power plants, and 30 hydro power plants. The second nuclear power plant is under construction (state up tu June 1997) and SE is participating in the construction of two hydro power plants and one combined cycle power plant. The efforts of SE, s.a. focus on the generation of power and heat with minimal environmental impacts. Ecology is given priority in the SE, a.s. development programmes. SE's mission is to permanently satisfy customers' needs, for an acceptable price and with minimal environmental impact. On this CD ROM next chapters are presented: (1) The structure of the Company; (2) Production units; (3) The economic power of the Company; (4) The operation culture; (5) The strategic plans of the Company

  15. Westinghouse Electric Company experiences in chemistry on-line monitoring in Eastern European nuclear power plants

    International Nuclear Information System (INIS)

    Balavage, J.

    2001-01-01

    Westinghouse Electric Company has provided a number of Chemistry On-Line Monitoring (OLM) Systems to Nuclear Power Plants in Eastern Europe. Eleven systems were provided to the Temelin Nuclear Power Plant in the south of the Czech Republic. Four systems were provided to the Russian NPP at Novovoronezh. In addition, a system design was developed for primary side chemistry monitoring for units 5 and 6 of another eastern European VVER. The status of the Temelin OLM systems is discussed including updates to the Temelin designs, and the other Eastern European installations and designs are also described briefly. Some of the problems encountered and lessons learned from these projects are also discussed. (R.P.)

  16. Preparing Canada's power systems for transition to the year 2000: the Y2K programs of Canada's electric utility companies: province-by-province report

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    1999-09-01

    The province-by-province report covers BC Hydro; TransAlta, ATCO Ltd., EPCOR, and Enmax, SaskPower, Manitoba Hydro, Winnipeg Hydro, Ontario Power Generation, Ontario Hydro Services Company, Toronto Hydro, Hydro-Quebec and Energie Maclaren, Newfoundland and Labrador Hydro, Newfoundland Power, Nova Scotia Power, Maritime Electric,Yukon and Northwest Territories,Yukon Electrical Company Ltd., Northland Utilities (Yellowknife) Ltd. and Northland Utilities (NWT) Ltd. A report typically deals with inventory, testing and remediation of business systems, inventory, testing and remediation of operational control devices, business partner reviews, and preparation and exercising of contingency plans, as well as Y2K status and readiness reports, and dateline preparations.

  17. Assessing the financial positions of Ontario`s new electricity companies

    Energy Technology Data Exchange (ETDEWEB)

    Connell, T. [Standard and Poor`s, Toronto, ON (Canada)

    1999-11-01

    This paper describes the methodology, including the criteria factors, comparable ratings and key credit issues used in assessing the financial positions of Ontario Power Generation Inc., and the Ontario Hydro Services Company. The rating criteria factors include both business factors (such as ownership structure, regulation, service area, operations, management, etc.,) and financial factors (e.g. financial policies and guidelines, recent financial performance, margin analysis, capital structure and borrowing plans, financial projections and sensitivities). Key credit issues include considerations of competitive dynamics, nuclear portfolio performance (for Genco), regulatory changes, cost control, capital spending program, retail business exposure, future financial performance. Comparisons are made with corresponding positions of comparable entities in Australia, Finland, New Zealand, the UK, and the USA. In the case of Ontario Power Generation Inc., the company is assessed to have significant advantages initially, but various uncertainties over the medium term warrant a more cautious view of the credit profile. For the Ontario Hydro Services Company the business risks appear to be low and moderate leverage entails a strong, stable credit profile. The overall assessment of the two companies is that while certain questions such as the workability and credibility of the new industry structure, the problem of stranded debt and questions about the liquidity of market participants remain unsolved, Ontario Power Generation Inc., and the Ontario Hydro Services Company ratings compare favorably with ratings of global industry peers.

  18. Three-dimensional numerical reservoir simulation of the EGS Demonstration Project at The Geysers geothermal field

    Science.gov (United States)

    Borgia, Andrea; Rutqvist, Jonny; Oldenburg, Curt M.; Hutchings, Lawrence; Garcia, Julio; Walters, Mark; Hartline, Craig; Jeanne, Pierre; Dobson, Patrick; Boyle, Katie

    2013-04-01

    The Enhanced Geothermal System (EGS) Demonstration Project, currently underway at the Northwest Geysers, California, aims to demonstrate the feasibility of stimulating a deep high-temperature reservoir (up to 400 °C) through water injection over a 2-year period. On October 6, 2011, injection of 25 l/s started from the Prati 32 well at a depth interval of 1850-2699 m below sea level. After a period of almost 2 months, the injection rate was raised to 63 l/s. The flow rate was then decreased to 44 l/s after an additional 3.5 months and maintained at 25 l/s up to August 20, 2012. Significant well-head pressure changes were recorded at Prati State 31 well, which is separated from Prati 32 by about 500 m at reservoir level. More subdued pressure increases occur at greater distances. The water injection caused induced seismicity in the reservoir in the vicinity of the well. Microseismic monitoring and interpretation shows that the cloud of seismic events is mainly located in the granitic intrusion below the injection zone, forming a cluster elongated SSE-NNW (azimuth 170°) that dips steeply to the west. In general, the magnitude of the events increases with depth and the hypocenter depth increases with time. This seismic cloud is hypothesized to correlate with enhanced permeability in the high-temperature reservoir and its variation with time. Based on the existing borehole data, we use the GMS™ GUI to construct a realistic three-dimensional (3D) geologic model of the Northwest Geysers geothermal field. This model includes, from the top down, a low permeability graywacke layer that forms the caprock for the reservoir, an isothermal steam zone (known as the normal temperature reservoir) within metagraywacke, a hornfels zone (where the high-temperature reservoir is located), and a felsite layer that is assumed to extend downward to the magmatic heat source. We then map this model onto a rectangular grid for use with the TOUGH2 multiphase, multicomponent, non

  19. Change in Nuclear Electric

    International Nuclear Information System (INIS)

    Smart, D.

    1996-01-01

    Activities of Nuclear Electric company (Great Britain) in 1990-1995, aimed at privatization of certain NPPs and services, are considered. The company introduced commercial principles of work and control in all areas of expenditures. Great attention was paid to the work with personnel according to the program Investments in Personnel. All these initiatives resulted in increase in the total electricity production by 39% during the period of time under consideration in the 100% increase in the output per man/hour. This made it possible for the government to introduce its proposal on privatization of greater part of companies

  20. How a traditional company seeded new analytics capabilities

    NARCIS (Netherlands)

    Gust, G. (Gunther); D. Neumann (Dirk); Flath, C.M. (Christoph M.); T. Brandt (Tobias); Ströhle, P. (Philipp)

    2017-01-01

    textabstractDeveloping state-of-the art data analytics capabilities is a challenge for traditional companies with long-established processes and legacy systems. We describe how one such company (a Swiss electricity utility) conducted a seed project-a bottom-up initiative to develop an analytics

  1. Site Specific Probabilistic Seismic Hazard and Risk Analysis for Surrounding Communities of The Geysers Geothermal Development Area

    Science.gov (United States)

    Miah, M.; Hutchings, L. J.; Savy, J. B.

    2014-12-01

    We conduct a probabilistic seismic hazard and risk analysis from induced and tectonic earthquakes for a 50 km radius area centered on The Geysers, California and for the next ten years. We calculate hazard with both a conventional and physics-based approach. We estimate site specific hazard. We convert hazard to risk of nuisance and damage to structures per year and map the risk. For the conventional PSHA we assume the past ten years is indicative of hazard for the next ten years from Mnoise. Then, we interpolate within each geologic unit in finely gridded points. All grid points within a unit are weighted by distance from each data collection point. The entire process is repeated for all of the other types of geologic units until the entire area is gridded and assigned a hazard value for every grid points. We found that nuisance and damage risks calculated by both conventional and physics-based approaches provided almost identical results. This is very surprising since they were calculated by completely independent means. The conventional approach used the actual catalog of the past ten years of earthquakes to estimate the hazard for the next ten year. While the physics-based approach used geotechnical modeling to calculate the catalog for the next ten years. Similarly, for the conventional PSHA, we utilized attenuation relations from past earthquakes recorded at the Geysers to translate the ground motion from the source to the site. While for the physics-based approach we calculated ground motion from simulation of actual earthquake rupture. Finally, the source of the earthquakes was the actual source for the conventional PSHA. While, we assumed random fractures for the physics-based approach. From all this, we consider the calculation of the conventional approach, based on actual data, to validate the physics-based approach used.

  2. Time-of-use rates vs. Hopkinson tariffs redux: an analysis of the choice of rate structures in a regulated electricity distribution company

    International Nuclear Information System (INIS)

    Seeto, Dewey; Woo, C.K.; Horowitz, Ira

    1997-01-01

    Recent proposals to restructure the electricity industry in North America may effect the disintegration of a vertically integrated company into several smaller entities, including distribution companies (DISCOs) We explore whether time-of-use (TOU) pricing or a Hopkinson tariff would be more suitable for a regulated DISCO. Focusing on the economic efficiency of these alternative rate structures, we argue that a Hopkinson tariff with demand subscription is superior to TOU rates, as it can better handle the limited load diversity of local transmission and distribution (TD) demands made on the contemporary DISCO, while finessing the problem of endogenous marginal costs of local TD capacity. (Author)

  3. Planning and administration of human resources in Brazilian Electric Power Companies; Planejamento e administracao de recursos humanos nas empresas brasileiras do setor de energia eletrica

    Energy Technology Data Exchange (ETDEWEB)

    Dias, Devanir Vieira

    1985-12-01

    Administration and planning of human resources in Brazilian Companies of Electric Power Sector analyzes the evolution of the concept of business planning. This work explore the specific literature of this theme, giving emphasis in predict methods and human resources development and planning models. Is also presented a case study, realized in 1979, which comprehended 84 % of Brazilian Energy Companies. This study aims to evaluate the results of an implementation of this planning and development models 64 refs., 12 figs., 22 tabs.

  4. 77 FR 74125 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2012-12-13

    ... Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of proposed... Company (GE) CF34-8C and CF34-8E turbofan engines with certain part numbers (P/N) of operability bleed... received reports of three failure events of OBV ring lock fuel fittings on GE CF34-8C turbofan engines. Two...

  5. Advance of technological innovations of electric power in 2012

    International Nuclear Information System (INIS)

    Mayumi, Akihiko; Tanaka, Masanori; Takebe, Toshiro

    2013-01-01

    Twelve companies in Japan reported on the technological innovations in 2012. The Japan Atomic Power Company mainly studied five projects; (1) control of wall thinning of the secondary system in PWR by injection of molybdic acid, (2) application of pipe test method using electromagnetic acoustic resonance to existing equipment, (3) developed high performance Co-60 crud removal resin for Tsuruga Power Station Unit 2, (4) improvement of technology for safety of core in FBR, and (5) improvement of technology for coolant of FBR by dispersing nano-particles in liquid sodium metal. Tokyo Electric Power Company developed mainly three projects; (1) the support for the mental health care activities by industry protection staff at the Fukushima Daiichi and Daini Nuclear Power Plant, (2) laboratory test method using non-radioactive cesium for performance of decontamination reagent, and (3) decontamination effects estimation code (DeConEP). Hokuriku Electric Power Company reported the operations management measures in accordance with the safety enhancement measures to Shika nuclear power station. Other nine reports are published by Hokkaido Electric Power Co., Inc. Tohoku Electric Power Co., Inc. Chubu Electric Power Co., Inc., The Kansai Electric Power Co., Inc., The Chugoku Electric Power Co., Inc., Shikoku Electric Power Co., Inc., Kyushu Electric Power Co., Inc., Okinawa Electric Power Company Inc. and J-Power. (S.Y.)

  6. Restructuring of SE, Plc - from a functionally managed company to a process managed commercial-production company

    International Nuclear Information System (INIS)

    Ravasz, V.

    2004-01-01

    The purpose of this presentation is to inform the participants about present changes currently occurred within Slovenske elektrarne, a. s. (SE, Plc). Changes are related to the liberalisation of the electricity market and expected accession of Slovakia to EU. To support its competitiveness, the SE, Plc became a customer-oriented company, prepared to the access of strategic investor. The paper includes the basic information about centralisation and project of Restructuring of SE, Plc., which has started in December 2003. The aim of Restructuring is the change from functionally managed company to a process managed commercial-production company

  7. Analysis of induced seismicity at The Geysers geothermal field, California

    Science.gov (United States)

    Emolo, A.; Maercklin, N.; Matrullo, E.; Orefice, A.; Amoroso, O.; Convertito, V.; Sharma, N.; Zollo, A.

    2012-12-01

    Fluid injection, steam extraction, and reservoir stimulation in geothermal systems lead to induced seismicity. While in rare cases induced events may be large enough to pose a hazard, on the other hand the microseismicity provides information on the extent and the space-time varying properties of the reservoir. Therefore, microseismic monitoring is important, both for mitigation of unwanted effects of industrial operations and for continuous assessment of reservoir conditions. Here we analyze induced seismicity at The Geysers geothermal field in California, a vapor-dominated field with the top of the main steam reservoir some 1-3 km below the surface. Commercial exploitation began in the 1960s, and the seismicity increased with increasing field development. We focus our analyses on induced seismicity recorded between August 2007 and October 2011. Our calibrated waveform database contains some 15000 events with magnitudes between 1.0 and 4.5 and recorded by the LBNL Geysers/Calpine surface seismic network. We associated all data with events from the NCEDC earthquake catalog and re-picked first arrival times. Using selected events with at least 20 high-quality P-wave picks, we determined a minimum 1-D velocity model using VELEST. A well-constrained P-velocity model shows a sharp velocity increase at 1-2 km depth (from 3 to 5 km/s) and then a gradient-like trend down to about 5 km depth, where velocities reach values of 6-7 km/s. The station corrections show coherent, relatively high, positive travel time delays in the NW zone, thus indicating a strong lateral variation of the P-wave velocities. We determined an average Vp-to-Vs ratio of 1.67, which is consistent with estimates from other authors for the same time period. The events have been relocated in the new model using a non-linear probabilistic methods. The seismicity appears spatially diffused in a 15x10 km2 area elongated in NW-SE direction, and earthquake depths range between 0 and 6 km. As in previous

  8. Modification of reactor installation in the Genkai nuclear power plant No. 1 of Kyushu Electric Power Company, Inc

    International Nuclear Information System (INIS)

    1979-01-01

    The Nuclear Safety Commission recognized the adequacy concerning the inquiry which was offered from the Minister of International Trade and Industry on July 25, 1979, following the safety evaluation in the Ministry of International Trade and Industry, and decided to submit a report to the Minister of International Trade and Industry on July 26, 1979, about the modification of reactor installation in the Genkai nuclear power plant No. 1 of the Kyushu Electric Power Company, Inc. This is concerned to the application which was made from the president of the Kyushu Electric Power Company, Inc., to the Minister of International Trade and Industry on July 24, 1979. The content of the modification is to add a control circuit which is actuated by the signal of abnormal low pressure in a reactor to the circuit of actuating the emergency core cooling system of the plant. The influences on the safety protection system by the addition of the circuit transmitting safety injection signal and by the additions of an interlock circuit preventing the misoperation of pressurizer spray and of a block circuit of safety injection signal in case of the abnormal low pressure in a reactor were evaluated. The effects on the function and characteristics of the emergency core cooling system due to the addition of the control circuit were investigated, and it was recognized by the analysis that there is no effect in the pipe ruptures of both small and large scales. (Nakai, Y.)

  9. 78 FR 21578 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2013-04-11

    ... Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of proposed... Company (GE) model GEnx-2B67 and GEnx-2B67B turbofan engines with booster anti-ice (BAI) air duct, part... GE model GEnx-2B67 and GEnx- 2B67B turbofan engines with BAI air duct, P/N 2469M32G01, and support...

  10. The impact of climate change on the strategies of the electricity industry

    International Nuclear Information System (INIS)

    2000-01-01

    This report is a compilation of the results of a questionnaire survey conducted among eight companies from the E7 and six electricity companies outside the E7, investigating how each company, within its own particular circumstances, deals with the climate change issue as a business issue, and the specific actions that are being taken by major electric companies to alleviate the effect of greenhouse gas emissions. In doing this survey, the E7 companies expect that the results demonstrate the role of electricity as an important means to reduce greenhouse gas emissions, the seriousness with which electric companies in both Annex I and non-Annex I countries view climate change mitigation measures as an important aspect of their corporate strategies, and the extent of cooperation among companies in the electricity sector worldwide as an effective and practical approach to reducing greenhouse gas emissions. 7 refs., 6 tabs., 11 figs

  11. Vacuum education courses at the General Electric Company's Neutron Devices Department, St. Petersburg, Florida

    International Nuclear Information System (INIS)

    Provo, J.L.; Brown, W.C.

    1978-01-01

    Vacuum Technology has, from the beginning, played a key role in the production of the Department's products at the General Electric Company's Neutron Devices Department (GEND). Early recognition was given to the need for vacuum education and training for producing and maintaining vacuums to meet departmental objectives. The vacuum courses taught at GEND are described. These include basic Vacuum Technology, Advanced Vacuum Technology, and specialized vacuum related courses. Course offering rationale, outlines of subject matter covered and criteria for measuring effectiveness will be presented for each course. Such vacuum technology related courses have resulted in improved GEND product quality and in reducing losses and production cost. At the same time, these courses have given participating employees career motivation for fulfilling more challenging vacuum technology job related positions and have enabled them to achieve upward mobility in the Department's work force

  12. The impacts of different bidding segment numbers on bidding strategies of generation companies

    International Nuclear Information System (INIS)

    Wang, L.; Yu, C.W.; Wen, F.S.

    2008-01-01

    In a competitive electricity market, generation companies design bidding strategies to maximize their individual profits subject to the constraints imposed by bidding rules. For a generation company, obviously, the optimal bidding strategy and hence the potential of exercising market power may be different if different bidding rules are employed. Hence, a well-designed bidding protocol is vital to the effective and efficient operation of an electricity market. Based on the widely used stepwise bidding rules, the impacts of different numbers of bidding segments on the bidding strategies of generation companies are investigated. This study is focused on a price-taker generation company in an electricity market. A probabilisic model is used to simulate electricity price in the competitive market environment. With a given number of bidding segments, the optimal bidding strategy for a price-taker generation company is then developed. The effects of risk preferences as well as information asymmetry on the optimal bidding strategy are also examined. With particular references to the impacts of different numbers of bidding segments on the optimal bidding strategy, a numerical example is employed to demonstrate the validity of the proposed model and methodology. (author)

  13. Comprehensive Evaluation for Operating Efficiency of Electricity Retail Companies Based on the Improved TOPSIS Method and LSSVM Optimized by Modified Ant Colony Algorithm from the View of Sustainable Development

    Directory of Open Access Journals (Sweden)

    Dongxiao Niu

    2018-03-01

    Full Text Available The electricity market of China is currently in the process of a new institutional reform. Diversified electricity retail entities are gradually being established with the opening of the marketing electricity side. In the face of a complex market environment and fierce competition, the operating efficiency can directly reflect the current market position and development of electricity retail companies. TOPSIS method can make full use of the information of original data, calculate the distance between evaluated objects and the ideal solutions and get the relative proximity, which is generally used in the overall department and comprehensive evaluation of the benefits. Least squares support vector machine (LSSVM, with high convergence precision, helps save the training time of algorithm by solving linear equations and is used to predict the comprehensive evaluation value. Considering the ultimate goal of sustainable development, a comprehensive evaluation model on operating efficiency of electricity retail companies based on the improved TOPSIS method and LSSVM optimized by modified ant colony algorithm is proposed in this paper. Firstly, from the view of sustainable development, an operating efficiency evaluation indicator system is constructed. Secondly, the entropy weight method is applied to empower the indicators objectively. After that, based on the improved TOPSIS method, the reverse problem in the evaluation process is eliminated. According to the relative proximity between the evaluated objects and the absolute ideal solutions, the scores of comprehensive evaluation for operating efficiency can then be ranked. Finally, the LSSVM optimized by modified ant colony algorithm is introduced to realize the simplified expert scoring process and fast calculation in the comprehensive evaluation process, and its improved learning and generalization ability can be used in the comprehensive evaluation of similar projects. The example analysis proves

  14. We let the electricity giants shrink. Anti-nuclear activists can be successful even against the largest companies; Wir lassen die Stromriesen schrumpfen. AtomkraftgegnerInnen koennen sogar gegen die groessten Konzerne erfolgreich sein

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2015-12-15

    In the newsletter the authors discuss the issues economic situation of the large electricity companies in Germany, the governmental energy policy, the ongoing financial support by the government, and the possibility to shutdown all German nuclear power plants without electricity shortcomings.

  15. Choice of models and data availability for the efficiency analysis of the Dutch distribution and supply companies in the electricity sector. Background document of 'Guidelines for price cap regulation in the Dutch electricity sector'

    International Nuclear Information System (INIS)

    Burns, P.; Huggins, M.; Riechmann, C.; Weyman-Jones, T.

    2000-02-01

    July 1999 The Netherlands Electricity Regulatory Service (DtE) published an Information and Consultation Document on the title subject. By means of price cap regulation tariffs are determined such that businesses are stimulated continuously to organize their total processes and operation as efficient as possible. In the consultation document a large number of questions with respect to the future organization and planning of the system of economic regulation of the electricity sector in the Netherlands can be found. Many reactions and answers were received, compiled and analyzed. The results are presented in the main report, which forms the framework for the DtE to shape the economic regulation of the Dutch electricity sector. In this background document attention is paid to the most appropriate models by means of which the efficiency of the electricity companies in the Netherlands can be analyzed

  16. Southeast Regional Wastewater Treatment Plant Facilities Improvements Project and Geysers Effluent Pipeline Project. Final EIR/EIS

    International Nuclear Information System (INIS)

    1994-01-01

    On May 26, 1994, the Lake County Sanitation District and the US Bureau of Land Management released for public review a Draft Environmental Impact Report/Environmental Impact Statement (EIR/EIS) on the proposed Southeast Regional Wastewater Treatment Plant Facilities Improvements Project and Geysers Effluent Pipeline Project. A minimum 45-day review and comment period began on that date and notices were published in the Federal Register. The public review and comment period closed on July 26, 1994. Public hearings on the Draft EIMIS were held in Lakeport, CA, on June 30 and July 14, 1994. The first part of this document contains copies of the written comments submitted on the Draft EIR/EIS. It also contains summary paraphrased comments of the public hearings. The second part of this document contains responses to the comments

  17. Study on Stochastic Optimal Electric Power Procurement Strategies with Uncertain Market Prices

    Science.gov (United States)

    Sakchai, Siripatanakulkhajorn; Saisho, Yuichi; Fujii, Yasumasa; Yamaji, Kenji

    The player in deregulated electricity markets can be categorized into three groups of GENCO (Generator Companies), TRNASCO (Transmission Companies), DISCO (Distribution Companies). This research focuses on the role of Distribution Companies, which purchase electricity from market at randomly fluctuating prices, and provide it to their customers at given fixed prices. Therefore Distribution companies have to take the risk stemming from price fluctuation of electricity instead of the customers. This entails the necessity to develop a certain method to make an optimal strategy for electricity procurement. In such a circumstance, this research has the purpose for proposing the mathematical method based on stochastic dynamic programming to evaluate the value of a long-term bilateral contract of electricity trade, and also a project of combination of the bilateral contract and power generation with their own generators for procuring electric power in deregulated market.

  18. The French Electricity Company (EDF) and the environment. Press file for 1996; EDF et l'environnment 1996. Dossier de presse

    Energy Technology Data Exchange (ETDEWEB)

    Bourdier, Jean-Pierre [Electricite de France (EDF), 75 - Paris (France)

    1997-03-27

    In 1996 the actions of EDF in the domain of environment have recorded FF 4 billions (FF 3.5 billion in 1995), representing about 2% of the EDF's turnover. The EDF keeps on its efforts for reducing the impact of its activities upon environment. Several applications of an environment protective electricity generation are promoted by the company. The company brings services and technical solutions to its clients which meet their energy needs and conserving at the same time the life conditions. Furthermore, EDF participates in the activity of numerous national and international organisms, intervening in the environmental questions, in decision making, participating in studies and actions and following continually the direction of a durable economic and social development. The report is structured in three chapters: 1. an industrial responsibility; 2. services and techniques for environment; 3. action towards a durable development.

  19. Assessing the financial positions of Ontario's new electricity companies

    Energy Technology Data Exchange (ETDEWEB)

    Connell, T. (Standard and Poor' s, Toronto, ON (Canada))

    1999-01-01

    This paper describes the methodology, including the criteria factors, comparable ratings and key credit issues used in assessing the financial positions of Ontario Power Generation Inc., and the Ontario Hydro Services Company. The rating criteria factors include both business factors (such as ownership structure, regulation, service area, operations, management, etc.,) and financial factors (e.g. financial policies and guidelines, recent financial performance, margin analysis, capital structure and borrowing plans, financial projections and sensitivities). Key credit issues include considerations of competitive dynamics, nuclear portfolio performance (for Genco), regulatory changes, cost control, capital spending program, retail business exposure, future financial performance. Comparisons are made with corresponding positions of comparable entities in Australia, Finland, New Zealand, the UK, and the USA. In the case of Ontario Power Generation Inc., the company is assessed to have significant advantages initially, but various uncertainties over the medium term warrant a more cautious view of the credit profile. For the Ontario Hydro Services Company the business risks appear to be low and moderate leverage entails a strong, stable credit profile. The overall assessment of the two companies is that while certain questions such as the workability and credibility of the new industry structure, the problem of stranded debt and questions about the liquidity of market participants remain unsolved, Ontario Power Generation Inc., and the Ontario Hydro Services Company ratings compare favorably with ratings of global industry peers.

  20. Analysis of rationality and efficiency of electricity utilization in posture poultry companies by computation platform based in fuzzy system; Analise da racionalidade e eficiencia da utilizacao de energia eletrica em empresas de avicultura de postura via plataforma computacional baseada em sistema fuzzy

    Energy Technology Data Exchange (ETDEWEB)

    Cremasco, Camila Pires [Universidade Estadual Paulista Julio de Mesquita Filho (UNESP), Botucatu, SP (Brazil). Dept. de Bioestatistica; Faculdade de Tecnologia (FATEC), Presidente Prudente, SP (Brazil); Gabriel Filho, Luis Roberto Almeida [Universidade Estadual Paulista Julio de Mesquita Filho (UNESP), Tupa, SP (Brazil). Fac. de Ciencias Agronomicas; Viais Neto, Daniel dos Santos; Bordin, Deyver [Faculdade de Tecnologia (FATEC), Presidente Prudente, SP (Brazil); Silva, Helenice de Oliveira Florentino [Universidade Estadual Paulista Julio de Mesquita Filho (UNESP), Botucatu, SP (Brazil). Dept. de Bioestatistica], E-mails: gabrielfilho@tupa.unesp.br., dvneto@fatecpp.edu.br, bordin@yahoo.com.br, helenice@ibb.unesp.br

    2012-11-01

    A great application of intelligent systems is in control of the electric power consumption of enterprises. For the assessment of the way that the company uses the electricity there are two indices which are called load factor and power factor. To facilitate the assessment of the performance of electric power consumption by the companies it is interesting that there is a single index indicating globally as energy is being used by the same. The goal of this work was to develop a software to assist laying poultry companies in the region of Bastos in more rational and efficient use of electric energy. For this, a system has been developed called Fuzzy Energy integrated environment developed with Delphi 2010. For the determination of fuzzy factor (situation of the company), we used a fuzzy system prepared in advance. The data collected over a period of 3 years helped the system programming. The software was able to present the situation of the company studied in a manner accessible to the user, and their results were tested accuracy 100 according to fuzzy system. With the inference method of Mandani, unable to create a general simulation of all relevant points of enterprise data. (author)

  1. Electricity: the new millennium. A global gathering of the new electric industry -- an unparalleled conference... for a unique moment in time

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    2000-05-01

    'Electricity: The New Millennium' is a conference sponsored by four major industry associations -- Edison Electric Institute of the United States, the International Union of Producers of Electrical Energy in Europe, the Canadian Electricity Association and Japan's Federation of Electric Power Companies. The International Energy Agency and the host company, Hydro-Quebec, were also co-sponsors of this crucial and memorable event to provide company CEOs and other top executives of electric companies with opportunities to equip themselves with the facts and viewpoints essential to success in the restructured electrical business environment. The meeting and the accompanying exhibit took place in Montreal, Quebec, on June 18-21, 2000, and drew attendees and exhibitors from all over the world to discuss the radical changes that are affecting the industry in terms of the organization of production and delivery of electric power. Opportunities were also be provided to explore the challenges facing the industry on a global basis, including exploring ways to use emerging technologies for delivering the benefits of electric power to under-served regions of the world's population that has yet to enjoy the most basic quality of life improvements that electricity can afford. Critical issues sessions also explored issues such as building stronger customer relations, organizing and financing the industry's transition, mastering cultural change, the relationship between meeting society's goals and market forces, and transmission systems in transition. Commensurate with the vast range of topics, speakers and session leaders have been recruited from the ranks of chief executives of major energy companies from America to Zambia, government agencies, leaders of major power users, and industry associations. Also appended to this description of the conference are an exhibition floor plan,a directory of exhibitors, and a description of sponsoring organizations

  2. Financing the electric power utilities, especially the nuclear power in Japan

    International Nuclear Information System (INIS)

    Tajima, T.

    1975-04-01

    Electric power demands in Japan have shown a remarkable growth at an annual rate of 12% since 1965. Nine electric power companies have invested large amounts of money so far, amounting to over 1 trillion yen every year since 1972. A survey of the electric power supply system and an estimation of the electric power demands in 1980 and in 1985 are given. It is expected that the main portion of electric power in the future will gradually be generated by nuclear plants. Financial features of the electrical power utilities, the credit risk of the electric power utilities, and the raising of funds by electric power utilities are discussed. It is concluded that it will be necessary (1) to expand the capital market, (2) to enable the electric power companies to issue a sufficient amount of bonds, (3) to make the Government financing institutions, such as the Japan Development Bank, provide the electric power companies with larger funds on a long-term and low-interest rate basis, and (4) even to take such drastic steps as subsidizing interest on private loans to the electric power companies. (B.P.)

  3. New maintenance strategy of Tokyo Electric Power Company and Fukushima Dai-ichi Nuclear Power Plant for effective ageing management and safe long-term operation

    International Nuclear Information System (INIS)

    Inagaki, Takeyuki; Yamashita, Norimichi

    2009-01-01

    Fukushima Dai-ichi Nuclear Power Plant is the oldest among three nuclear power plants owned and operated by Tokyo Electric Power Company, which consists of six boiling water reactor units. The commercial operation of Unit 1 was commenced in 1971 (37 years old) and Unit 6 in 1978 (29 years old). Currently ageing degradations of systems, structures and components are managed through maintenance programs, component replacement/refurbishment programs and long-term maintenance plans. The long-term maintenance plans are established through ageing management component replacement/refurbishment programs reviews performed before the 30th year of operation and they are for safe and reliable operation after 30 years (long-term operation). However the past maintenance actions and past component replacement/refurbishment programs were not always proactive and past operational experience and maintenance practices suggest that effective/proactive ageing management programs be introduced in earlier stage of the plant operation. In this circumstance, Tokyo Electric Power Company and Fukushima Dai-ichi Nuclear Power Plant are setting up a new maintenance strategy that includes 1) improving the normal maintenance programs by using ageing degradation data, 2) effective use of information on internal/external operational experience and maintenance practices related to ageing, and 3) proactive component/equipment refurbishment programs during a refreshment outage for safe and reliable long-term operation. To accomplish the goal of this strategy, strengthening engineering capability of plant staff members is a crucial required for the plant. The objective of this paper is to briefly explain main results ageing management reviews, past and current significant ageing issues and management programs against them, and the new maintenance strategy established by Tokyo Electric Power Company and Fukushima Dai-ichi Nuclear Power Plant. (author)

  4. Global electricity strategy: the twilight zone

    International Nuclear Information System (INIS)

    Sack, J.B.

    1997-01-01

    Directions for the electric power industry in the wake of deregulation are discussed, with mention of independent power producers and distributed generation, and with analogies from the effect of deregulation on gas companies, telephone companies and airlines. The author considers that most electrical utilities are in poor shape to face change, because they have no adequately detailed cost breakdown. Management skills will be at a premium

  5. Global electricity strategy: the twilight zone

    Energy Technology Data Exchange (ETDEWEB)

    Sack, J B

    1998-12-31

    Directions for the electric power industry in the wake of deregulation are discussed, with mention of independent power producers and distributed generation, and with analogies from the effect of deregulation on gas companies, telephone companies and airlines. The author considers that most electrical utilities are in poor shape to face change, because they have no adequately detailed cost breakdown. Management skills will be at a premium.

  6. Analysis of the General Electric Company swell tests with RELAP4/MOD7

    International Nuclear Information System (INIS)

    Fischer, S.R.; Hendrix, C.E.

    1979-01-01

    The RELAP4/MOD7 nuclear reactor transient analysis code, presently being developed by EG and G Idaho, Inc., will incorporate several significant improvements over earlier versions of RELAP4. As part of the development of RELAP4/MOD7, a thorough assessment of the capability of the code to simulate water reactor LOCA phenomena is being made. This assessment is accomplished in part by comparing results from code calculations with test data from experimental facilities. Simulations of the General Electric Company (GE) level swell tests were performed as part of the code checkout. In these tests, a pressurized vessel partially filled with nearly saturated water was blown down through a simulated break located near the top of the vessel. Comparison of RELAP4 calculations with data from these experiments indicates that the code has the capability to model the unequal phase velocity flow and resulting density gradients that might occur in a BWR steam line break transient. Comparisons of RELAP4 calculations with data from two level swell experiments are presented

  7. Long-term Nash equilibria in electricity markets

    International Nuclear Information System (INIS)

    Pozo, David; Contreras, Javier; Caballero, Angel; de Andres, Antonio

    2011-01-01

    In competitive electricity markets, companies simultaneously offer their productions to obtain the maximum profits on a daily basis. In the long run, the strategies utilized by the electric companies lead to various long-term equilibria that can be analyzed with the appropriate tools. We present a methodology to find plausible long-term Nash equilibria in pool-based electricity markets. The methodology is based on an iterative market Nash equilibrium model in which the companies can decide upon their offer strategies. An exponential smoothing of the bids submitted by the companies is applied to facilitate the convergence of the iterative procedure. In each iteration of the model the companies face residual demand curves that are accurately modeled by Hermite interpolating polynomials. We introduce the concept of meta-game equilibrium strategies to allow companies to have a range of offer strategies where several pure and mixed meta-game Nash equilibria are possible. With our model it is also possible to model uncertainty or to generate price scenarios for financial models that assess the value of a generating unit by real options analysis. The application of the proposed methodology is illustrated with several realistic case studies. (author)

  8. Ford Motor Company's Global Electrification Strategy

    OpenAIRE

    Ellen Hughes-Cromwick

    2011-01-01

    Ford Motor Company has developed global platforms for its vehicles, including hybrid electric vehicles and forthcoming battery-electric and plug-in hybrids. Providing electrification technologies is a key element of Ford's broader strategy of producing vehicles that have improved fuel economy and reduced greenhouse emissions. The breadth of this effort—across a range of vehicle types—is unique in the automotive industry. Of particular importance is using the same vehicle platforms for electri...

  9. Progress of technological innovation on electric power in FY2014

    International Nuclear Information System (INIS)

    Nishikawa, Yoshikazu; Fujii, Yutaka; Sasagawa, Toshiro

    2015-01-01

    This paper overviews the technological development in FY2014 at Tokyo Electric Power Company, Chubu Electric Power Company, Hokuriku Electric Power Company, Shikoku Electric Power Company, and Electric Power Development Company. In this overview, further breakdown was made for the following departments of each company: nuclear power generation, thermal power generation, hydraulic power generation, power transmission, power distribution, transformation, research and development and technological development, and information and communication. In addition, this paper outlines the achievement of technological development at Japan Atomic Power Company, such as the technological development related to the existing power station, development of new technology, and the development of future reactor. Fukushima Daiichi Nuclear Power Station has developed an investigative system using a high altitude survey robot and a movable monitoring system. Hamaoka Nuclear Power Station examined the feasibility of state diagnostic technique based on multi-point analysis, and studied stress corrosion cracking at the newly established Nuclear Safety Research Laboratory. Shika Nuclear Power Station (Unit 1) applied a pipe stress improvement process by means of high frequency induction heating as a stress corrosion cracking countermeasure. Ikata Nuclear Power Station newly adopted high degree cross-linking cation resin, and high cracking strength anion resin as the primary resins. Oma Nuclear Power Station worked on the all reactor core utilization technology of MOX fuel. (A.O.)

  10. The French Electricity Company (EDF) and the environment. Press file for 1996; EDF et l'environnment 1996. Dossier de presse

    Energy Technology Data Exchange (ETDEWEB)

    Bourdier, Jean-Pierre [Electricite de France (EDF), 75 - Paris (France)

    1997-03-27

    In 1996 the actions of EDF in the domain of environment have recorded FF 4 billions (FF 3.5 billion in 1995), representing about 2% of the EDF's turnover. The EDF keeps on its efforts for reducing the impact of its activities upon environment. Several applications of an environment protective electricity generation are promoted by the company. The company brings services and technical solutions to its clients which meet their energy needs and conserving at the same time the life conditions. Furthermore, EDF participates in the activity of numerous national and international organisms, intervening in the environmental questions, in decision making, participating in studies and actions and following continually the direction of a durable economic and social development. The report is structured in three chapters: 1. an industrial responsibility; 2. services and techniques for environment; 3. action towards a durable development.

  11. Management of organizational changes in the joint stock company

    OpenAIRE

    Vladimír Štípek

    2005-01-01

    The aim of the article is analysis of effects of organizational changes of Jihočeská energetika, joint stock company. This company accomplished the necessary steps to transform into new organization - the E.ON Group in Czech Republic. Liberalization of electricity market in Czech Republic saw the possibility for end - customers. The large boom in the development of organization came with the change of the of the owners. This company uses traditional line and staff organization chart, direct, ...

  12. Innovation in electric power technologies in 2009

    International Nuclear Information System (INIS)

    Ohfusa, Takahiro; Hayasaka, Eiji; Ino, Hiroyuki

    2010-01-01

    This is a report of the title by Tokyo Electric Power Company, Kansai Electric Power Co., Inc, Tohoku Electric Power and other nine enterprises in Japan. The outline is as follows. Tokyo Electric Power Company stated pipe thinning by the hot water based two-phase flow testing device, development of technologies for corrosion protection of nuclear reactor using titanium oxide, evaluation of fatigue damage by EBSD, and study of duty on the nuclear power plant. Japan Atomic Power Company (JAPC) stated the mechanism of decrease in exposure dose of the primary coolant system by zinc infusion, outline of Air Operated Valve Intelligent Diagnostic Analysis System (AVIDAS) and the grand packing system, development of SAPLS, the automatic search program of fuel position for design of PWR related core, development of compact containment water reactor (CCR) and FBR cycle system, investigation of the chain destruction of active fault under consideration of dynamic interaction of active faults and decommissioning of Tokai Nuclear Power Plant. Electric Power Development Company reported construction of the Oma Nuclear Power Plant, a future nuclear plant in Oma, Aomori. The reactor will be capable of using 100% MOX fuel core (MOX-ABWR). The operation will start November 2014. (S.Y.)

  13. Flora of the Mayacmas Mountains. [Listing of 679 species in the Geysers Geothermal Resource area

    Energy Technology Data Exchange (ETDEWEB)

    Neilson, J.A.

    1981-09-01

    This flora describes the plants that occur within the Mayacmas Mountain Range of northern California. It is the result of ten years of environmental assessment by the author in the Geysers Geothermal Resource area, located in the center of the Mayacmas Range. The flora includes notes on plant communities and ecology of the area, as well as habitat and collection data for most of the 679 species covered. Altogether 74 families, 299 genera and 679 species are included in the flora. The work is divided into eight subdivisions: trees; shrubs; ferns and fern allies; aquatic plants; tules, sedges, and rushes; lilies and related plants; dicot herbs; and grasses. Within each subdivision, family, genera and species are listed alphabetically. Keys are provided at the beginning of each subdivision. A unique combination of physical, environmental and geologic factors have resulted in a rich and diverse flora in the Mayacmas. Maps have been provided indicating known locations for species of rare or limited occurrence.

  14. Electric and gas utility marketing of residential energy conservation case studies

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-05-01

    The objective of this research was to obtain information about utility conservation marketing techniques from companies actively engaged in performing residential conservation services. Many utilities currently are offering comprehensive services (audits, listing of contractors and lenders, post-installation inspection, advertising, and performing consumer research). Activities are reported for the following utilities: Niagara Mohawk Power Corporation; Tampa Electric Company; Memphis Light, Gas, and Water Division; Northern States Power-Wisconsin; Public Service Company of Colorado; Arizona Public Service Company; Pacific Gas and Electric Company; Sacramento Municipal Utility District; and Pacific Power and Light Company.

  15. Challenges and Opportunities of Grid Modernization and Electric Transportation

    Energy Technology Data Exchange (ETDEWEB)

    Graham, Robert L. [Dept. of Energy (DOE), Washington DC (United States); Francis, Julieta [Allegheny Science and Technology, Bridgeport, WV (United States); Bogacz, Richard J. [Allegheny Science and Technology, Bridgeport, WV (United States)

    2017-03-31

    Grid investments that support electric vehicle deployments as a part of planned modernization efforts can enable a more efficient and cost-effective transition to electric transportation and allow investor-owned electric companies and public power companies to realize new revenue resources in times of flat or declining loads. This paper discusses the challenges and opportunities associated with an increase in plug-in electric vehicle (PEV) adoption and how working together both sectors stand to benefit from closer integration.

  16. Resolution 139/012. It authorize to RIO MIRADOR S.A company to generate a wind electricity source by a generating plant located in Maldonado town 5a. Catastral section, as well as the connection to the Interconnected National System

    International Nuclear Information System (INIS)

    2013-01-01

    This Resolution authorizes the generation of electricity using wind energy as the primary electricity source. This project was presented by RIO MIRADOR S.A wind generation company with the proposal to instal an electrical plant in Maldonado town. This authorization is according to the Electric Wholesale Market regulation

  17. 10 CFR 500.3 - Electric regions-electric region groupings for reliability measurements under the Powerplant and...

    Science.gov (United States)

    2010-01-01

    ... System (APS)—7, except Duquesne Light Company. 2. American Electric Power System (AEP)—entire AEP System... 10 Energy 4 2010-01-01 2010-01-01 false Electric regions-electric region groupings for reliability... of electric regions for use with regard to the Act. The regions are identified by FERC Power Supply...

  18. Transmission-constrained oligopoly in the Japanese electricity market

    International Nuclear Information System (INIS)

    Tanaka, Makoto

    2009-01-01

    We simulate the Japanese wholesale electricity market as a transmission-constrained Cournot market using a linear complementarity approach. First, we investigate the effects of upgrading the bottleneck transmission line between the eastern and western regions, focusing on the mitigation of transmission congestion. Although increasing the bottleneck capacity would lead to welfare gains, they might not be substantial particularly when transmission capacity costs are taken into account. Second, we examine the effects of splitting the largest electric power company, which is located in the eastern region, focusing on the mitigation of market power. Splitting the largest company into two companies would lead to a 25% reduction in the eastern price, and a 50% reduction in deadweight loss. The divestiture of the largest company would have a significant effect of mitigating market power in the Japanese electricity market. (author)

  19. 77 FR 74739 - Norfolk Southern Railway Company-Petition for Declaratory Order

    Science.gov (United States)

    2012-12-17

    ... DEPARTMENT OF TRANSPORTATION Surface Transportation Board [Docket No. FD 35701] Norfolk Southern Railway Company--Petition for Declaratory Order Norfolk Southern Railway Company (NS) filed a petition for..., APCO began removing trees and erecting electrical transmission towers and lines on its land. Thereafter...

  20. The electricity market 2002

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-10-01

    charges and taxes. The price of electricity dropped between 1997 and 2000, but began rising again to all electricity customers during 2000 and 2001. During the same period, the network charges remained largely unchanged, while the tax on electricity increased substantially. This led to an increase in the total cost to domestic customers, whereas the cost to industrial customers, who are exempt from taxes, is lower. The reform has enabled customers to choose freely the supplier from whom they want to buy their electricity. An opinion poll shows that most customers know that they can choose their supplier, and 37 % have acted on this by changing to a different supplier or negotiating their electricity price. The market concentration has increased in recent years since the dominating companies in Nordic countries have bought shares in competing companies on the Nordic market. The power companies and electricity trading companies are being developed towards bigger and more integrated energy companies, with operations in several countries. In recent years, the former surplus generation capacity in Sweden has been reduced. The oil-fired condensing power stations that were previously used in Sweden as reserve capacity have been decommissioned, and the first reactor in Barsebaeck was shut down. Svenska Kraftnaet, the Swedish grid utility, purchased a power reserve before the winter of 2000/2001 in order to strengthen the power balance during consumption peaks. During the autumn of 2001, the Government also entrusted Svenska Kraftnaet with the task of safe-guarding electricity generation capacity during very cold weather. This was to be done by purchasing reserve power capacity. The assignment resulted in additional power generation capacity consisting of previously decommissioned power generation plants and companies that were prepared to reduce their power consumption voluntarily. The procurement of reserve capacity is a temporary transitional measure. In the Government

  1. Creating a business environment in inventory management - The Philadelphia Electric Company experiences

    International Nuclear Information System (INIS)

    Franks, A.J.; Birch, H.

    1992-01-01

    Philadelphia Electric Company's (PECo's) Nuclear Engineering and Services Department was asked to develop a (non-fuel) inventory management philosophy that will optimize inventory dollars at Peach Bottom atomic power station and Limerick generating station. The ultimate goal of the project is to maximize the potential for the correct parts being available at the lowest possible level of investment. There are many factors that make the management of maintenance, repair, and operating (MRO) supply inventories more complicated than managing finished goods, work-in-progress, or raw materials. Determining correct inventory levels for nuclear power plants is complicated by the irregular demand for spare parts and the cyclic nature of demand caused by refueling outages. Based on the information collected, it was determined that PECo's nuclear group needed to develop policies and strategies to address the following issues: (1) inventory classification based on part criticality, usage, and demand forecast; (2) item level ordering policies based on classification system; (3) inventory performance management; and (4) management of obsolete/surplus parts. Currently, policies are being developed to manage surplus and obsolete materials. Opportunities are being explored regarding the potential capitalization of critical components and parts. The policies established for classification, ordering policies, and performance management are being translated into work processes via common procedures and guidelines

  2. Turmoil and transition: Electric utility industry trends

    International Nuclear Information System (INIS)

    1994-06-01

    In a review of electric utility industry trends, focusing on North America, it is noted that four critical influences are dominant: competition in the electricity supply business; technological advances; the recognized need for environmental protection; and a favoring of market economics and customer choice. As energy costs rose in the 1970s and 1980s, electricity usage growth rates decreased and demand side management became an accepted alternative to building new power plants. In large areas of Canada and the USA, substantial surplus generation capacity arose, transmission linkages improved, and regional electricity markets developed. Privatization measures in the British electric sector were closely studied in North America and electric markets in the USA were pushed toward more competition with the 1992 Energy Policy Act. Non-utility generators have entered the market, including industrial companies, pipeline companies, independent renewable-energy providers, and power companies set up by the utilities themselves. Power pools may evolve into regional transmission grids in which the transmission owning utilities would exchange their lines for an interest in the grid. California is likely to lead in opening access to transmission on a regional scale. Distribution systems are likely to remain a regulated monopoly as before. Substantial change is expected in customer services as functions such as power purchase and conservation are being performed by independent companies. Other possible developments in the industry include emissions trading and spot markets for power. The implications of these trends for British Columbia Hydro are discussed

  3. Electric power: the liberalization effects

    International Nuclear Information System (INIS)

    Carpentier, J.

    1999-01-01

    Nine months after the beginning of the deregulation of electric power markets in Europe, the first effects are being felt: fall of prices, amalgamation of electric power companies, development of new technologies and unemployment. (O.M.)

  4. Initiation of geyser during the resettlement of cryogenic liquid under impulsive reverse gravity acceleration in microgravity environment

    Science.gov (United States)

    Hung, R. J.; Shyu, K. L.

    1991-01-01

    The requirement to settle or to position liquid fluid over the outlet end of spacecraft propellant tank prior to main engine restart poses a microgravity fluid behavior problem. Resettlement or reorientation of liquid propellant can be accomplished by providing optimal acceleration to the spacecraft such that the propellant is reoriented over the tank outlet without any vapor entrainment, any excessive geysering, or any other undesirable fluid motion for the space fluid management under microgravity environment. The purpose of present study is to investigate most efficient technique for propellant resettling through the minimization of propellant usage and weight penalties. Comparison between the constant reverse gravity acceleration and impulsive reverse gravity acceleration to be used for the activation of propellant resettlement, it shows that impulsive reverse gravity thrust is superior to constant reverse gravity thrust for liquid reorientation in a reduced gravity environment.

  5. Congeneration feasibility: Otis Elavator Company and Polychrome Corporation

    Science.gov (United States)

    Fox, H.

    1982-05-01

    An investigation of the technical and economic feasibility of cogenerating electric and thermal power at two manufacturing plants (Otis Elevator Company and Polychrome Corporation) located on neighboring properties in Yonkers, NY is discussed. Existing electrical and steam producing equipment and energy consumption date are summarized. Alternative cases examined include electrical energy generation, electrical energy generation with waste heat recovery and a combined cycle case. Also reported are life cycle cost economic evaluations including simple payback period and return on investment indices. While it was concluded that cogeneration of heat and electricity at these industrial plant sites would not be economically viable, this detailed study provides valuable insights.

  6. Maritime Electric Co. Ltd. annual report, 1992

    International Nuclear Information System (INIS)

    1992-01-01

    Maritime Electric Company is a Canadian investor-owned electric utility based in Prince Edward Island. Established in 1918, the Company owns and operates a fully integrated system providing for the generation, transmission, and distribution of electricity throughout the Island. Maritime Electric operates generating plants in Charlottetown and Borden, and has an equity interest in NB Power's unit in Dalhousie, New Brunswick. Its 4,400 km distribution system and 560 km transmission system are linked to the mainland power grid by two submarine cables between the Island and the province of New Brunswick. This report describes the Company's operations, power production and sales for the year, with relevant statistical information. Financial statements are also included. In 1992 the Victoria Cross distribution substation was rebuilt. Earnings per share in 1992 were $1.85 compared with $1.79 in 1991. Demand side management initiatives were further enhanced and the plant life extension program continued at the Charlottetown Generating Plant. A ten year summary is included. 7 figs

  7. Revenue cap regulation in a deregulated electricity market : effects on a grid company

    OpenAIRE

    Bjørndal, Mette; Jörnsten, Kurt

    2002-01-01

    In 1997 an incentive-based regulation was introduced for Norwegian transmission and distribution companies. Under the following revenue regulation regime, the permissible revenue of a grid company is adjusted annually, and during the first regulation period, the new revenue cap was determined on the basis of last year’s revenue cap, adjusting for inflation, productivity improvement, and load growth. The idea behind the load growth compensation factor was that the grid companies should be comp...

  8. Biomass utilization at Northern States Power Company

    International Nuclear Information System (INIS)

    Ellis, R.P.

    1994-01-01

    Northern States Power Company (open-quotes NSPclose quotes) generates, transmits and distributes electricity and distributes natural gas to customers in Minnesota, Wisconsin, North Dakota, South Dakota and Michigan. An important and growing component of the fuel needed to generate steam for electrical production is biomass. This paper describes NSP's historical use of biomass, current biomass resources and an overview of how NSP plans to expand its use of biomass in the future

  9. Tampa Electric Company Polk Power Station IGCC project: Project status

    Energy Technology Data Exchange (ETDEWEB)

    McDaniel, J.E.; Carlson, M.R.; Hurd, R.; Pless, D.E.; Grant, M.D. [Tampa Electric Co., FL (United States)

    1997-12-31

    The Tampa Electric Company Polk Power Station is a nominal 250 MW (net) Integrated Gasification Combined Cycle (IGCC) power plant located to the southeast of Tampa, Florida in Polk County, Florida. This project is being partially funded under the Department of Energy`s Clean Coal Technology Program pursuant to a Round II award. The Polk Power Station uses oxygen-blown, entrained-flow IGCC technology licensed from Texaco Development Corporation to demonstrate significant reductions of SO{sub 2} and NO{sub x} emissions when compared to existing and future conventional coal-fired power plants. In addition, this project demonstrates the technical feasibility of commercial scale IGCC and Hot Gas Clean Up (HGCU) technology. The Polk Power Station achieved ``first fire`` of the gasification system on schedule in mid-July, 1996. Since that time, significant advances have occurred in the operation of the entire IGCC train. This paper addresses the operating experiences which occurred in the start-up and shakedown phase of the plant. Also, with the plant being declared in commercial operation as of September 30, 1996, the paper discusses the challenges encountered in the early phases of commercial operation. Finally, the future plans for improving the reliability and efficiency of the Unit in the first quarter of 1997 and beyond, as well as plans for future alternate fuel test burns, are detailed. The presentation features an up-to-the-minute update on actual performance parameters achieved by the Polk Power Station. These parameters include overall Unit capacity, heat rate, and availability. In addition, the current status of the start-up activities for the HGCU portion of the plant is discussed.

  10. Global Infrastructure Investment, Competition,and the Japanese Companies

    OpenAIRE

    新保, 博彦; シンポ, ヒロヒコ; Hirohiko, SHIMPO

    2011-01-01

    This paper discusses four infrastructure industries all of which are expected to grow rapidly in the 21st century: the electric power industry, the water industry, the railroad industry, and the aircraft and space development. First, this paper describes the general trends of the FDI in the four noted industries. Based on the above examinations, this paper investigates these industrial trends, focusing on specific companies in various countries. To investigate each individual company, this pa...

  11. The business for power : hydro-electricity in southeastern British Columbia 1897-1997

    International Nuclear Information System (INIS)

    Mouat, J.

    1997-01-01

    The evolution and development of the hydroelectric power industry in southeastern British Columbia was chronicled by recounting the first hundred years of the West Kootenay Power and Light Electrical Utility. The utility's first generator produced electricity in the summer of 1898 when hydro-electric companies were a new phenomenon. The factors behind the success of the company, the personalities of the promoters and entrepreneurs that launched the company, the complex interplay of unique events and the social and political context that illustrate a fascinating process in which electricity became an integral part of everyday life, are described. Refs., tabs., figs

  12. Modification of reactor installation in the Takahama nuclear power plants No.1 and No.2 of Kansai Electric Power Company, Inc

    International Nuclear Information System (INIS)

    1979-01-01

    The Nuclear Safety Commission recognized the adequacy concerning the inquiry which was offered from the Minister of International Trade and Industry on July 24, 1979, following the safety evaluation in the Ministry of International Trade and Industry, and decided to submit a report to the Minister of International Trade and Industry on July 26, 1979, about the modification of reactor installation in the Takahama nuclear power plants No. 1 and No. 2 of the Kansai Electric Power Company, Inc. This is concerned to the application which was made from the president of the Kansai Electric Power Company, Inc., to the Minister of International Trade and Industry on July 23, 1979. The content of the modification is to add a control circuit which is actuated by the signal of abnormal low pressure in a reactor to the circuit of actuating the emergency core cooling system of the plant. The influences on the safety protection system by the addition of the circuit for transmitting safety injection signal and by the additions of an interlock circuit preventing the misoperation of pressurizer spray and of a block circuit of safety injection signal in case of the abnormal low pressure in a reactor were evaluated. The effects on the function and characteristics of the emergency core cooling system due to the addition of the control circuit were investigated, and it was recognized by the analysis that there is no effect in the pipe ruptures of both small and large scales. (Nakai, Y.)

  13. Economies of vertical integration in the Swiss electricity sector

    Energy Technology Data Exchange (ETDEWEB)

    Fetz, Aurelio; Filippini, Massimo [Department of Management, Technology and Economics, ETH Zurich (Switzerland); Department of Economics, University of Lugano (Switzerland)

    2010-11-15

    Over the last two decades, several European nations have introduced reforms to their electricity sector. Generally, these reforms require a legal and functional unbundling of vertically integrated companies. These unbundling processes may reduce the possibilities that exist to fruitfully exploit the advantages of vertical integration. The goal of this paper is to empirically analyze the presence of economies of scale and vertical integration in the Swiss electricity sector. Economies of vertical integration between electricity production and distribution result from reduced transaction costs, better coordination of highly specific and interdependent investments and less financial risk. Different econometric specifications for panel data, including a random effects and a random-coefficients model, have been used to estimate a quadratic multi-stage cost function for a sample of electricity companies. The empirical results reflect the presence of considerable economies of vertical integration and economies of scale for most of the companies considered in the analysis. Moreover, the results suggest a variation in economies of vertical integration across companies due to unobserved heterogeneity. (author)

  14. Marketing BTUs: Gas, electricity lead oil in innovation

    International Nuclear Information System (INIS)

    Krapels, E.N.

    1996-01-01

    The transformation in relations between energy providers and users--powered by reform of electric utilities and by continuation of natural gas deregulation--is challenging several fundamental precepts of how oil companies managed their deregulation. In the wake of the price decontrol completed by the Reagan administration in 1981, oil companies (1) retreated from national business structures, (2) focused on limited range core businesses, and (3) provided minimal oil price risk management services for their customers. By contrast, the electric and natural gas industry is consolidating for the purpose of playing a role in ever-larger markets, diversifying its products and services, and providing innovative hedging instruments to itself as well as its customers. From Enron, one can purchase physical and paper energy, delivered in whatever form desired, nationwide and internationally, with or without mechanisms to manage price risk. What will impede the newly integrated energy companies--which are composite electric plus natural gas firms--from also delivering products and services now rendered by the oil companies? Could utilities organize gasoline consumers better than oil companies? If the Price Club can sell gasoline at 10 cents below market, why can't the new energy companies do so? The paper discusses what consumers want, procurement and costs, and innovations and lessons

  15. Computational simulation and lean thinking as tools of process management: an assessment of different alternatives to increase capacity in a manufacturing company of aluminum electrical cables

    Directory of Open Access Journals (Sweden)

    Tiago Augusto Amarante de Souza

    2014-12-01

    Full Text Available In this study, the production chain of a manufacturing company of aluminum electrical conductors is analyzed, in order to select the best strategy for increasing its production capacity. The company´s production systems and flows are highly complex and have high variability in their production flows. A quantitative modeling methodology was proposed to simulate those systems, and to analyze them in a simpler manner. The simulation model considered two different strategies related to production increase: “Lean Thinking” and Machinery/Equipment Purchase. From the current context and the results obtained from the simulation study, it was possible to conclude that the best scenario for increasing production capacity for the company was using the Lean Thinking strategy on the critical processes.The gains in capacity are higher and the implementing costs involved are lower than the ones observed in the other strategy considered.

  16. Impact of Contingent Liabilities Reclassification on Financial Performance: An Analysis with Brazilian Companies of Electricity Utilities Sector

    Directory of Open Access Journals (Sweden)

    Carlos Henrique Silva do Carmo

    2018-01-01

    Full Text Available The main objective of this research is to verify the effect of a reconfiguration of contingent liabilities in the financial performance of Brazilian companies in the electricity sector in the years 2013 to 2015. The sample consisted of 53 companies and 153 financial statements were analyzed. The model used to reconfigure the contingent liabilities into provisions was developed by Rose (2014. The author classifies the reversal in 5 scenarios: Optimistic (20% Partially Optimistic (40%, moderate (60% Partially Pessimistic (80% and Pessimistic (100%. To represent the economic and financial performance we selected three indicators: General Liquidity (LG, General Indebtedness (EG and Return Over Assets (ROA. The results showed that for worst-case scenarios, there is a significant difference between the indicators calculated on the original data in comparison with those calculated within the reclassified scenarios. The Statistics D of Cohen (1988 pointed out that, in addition to statistically significant, in the worst scenarios, the size effect was also too high, especially for the ROA and the Indebtedness. For Liquidity the differences were not so significant. The findings of this research serve as a warning to users of financial statements and pointed out that they should be aware of the financial effect of different interpretations of the individuals involved in decisions about the likelihood of loss in provision and Contingent liabilities.

  17. Inquiry relating to modifications of reactor installation in Ikata No. 1 and 2 nuclear power plants of Shikoku Electric Power Company, Inc

    International Nuclear Information System (INIS)

    1979-01-01

    Application was made to the Minister of International Trade and Industry for the license relating to the modifications of reactor installation in the Ikata No. 1 and 2 nuclear power plants of the Shikoku Electric Power Company, Inc., on February 13, 1979, from the president of the company. After the safety evaluation was finished by the Ministry of International Trade and Industry, inquiry was conducted to the Atomic Energy Safety Commission (AESC) on June 15, 1979, from the Minister of International Trade and Industry. The investigation and discussion were commenced by the AESC on June 19, 1979. The modifications of the reactor installation are the increase of new fuel storage capacity from about 1/3 to about 2/3 of in-core fuel for No. 1 plant and the modification of driving mechanism from the roller nut type to the magnetic jack type for the control rod cluster for adjusting power distribution in the No. 2 plant. The contents of the safety examination for each item written above are presented. The prevention of criticality is carefully practiced for the new fuel storage by putting fuel assemblies in stainless steel can type racks and locating the fuel assemblies at the proper distance. Relating to the driving mechanism for the control rod cluster adjusting power distribution, the driving speed is not modified and the reliability is kept by carrying out the continuous operation test and the electric power black out test as the demonstration test. The magnetic jack type mechanism has the locking device to prevent reactor tripping at the time of electric power black out, and the cluster is held at the location where the cluster existed at the time of black out. (Nakai, Y.)

  18. Favourability towards electric utilities jumps 10 per cent in 1997

    International Nuclear Information System (INIS)

    Anon.

    1997-01-01

    A recent survey of public opinion has shown that 85 per cent of the public view their electric utility company favourably. This represents a 10 per cent increase over last year. A survey of 4,090 Canadians was conducted which looked at the perceptions of the value of electricity services compared to telephone, natural gas, banking, and home insurance services. The study showed that Canadian electric utility companies are viewed as positively as the telephone companies and almost as favourably as the banks. Some 71 per cent of respondents reported that the value they receive from their electric utility is excellent or good. Lower prices, better customer services and increased research into alternative power sources were among the benefits that Canadians perceive would result from a more competitive electricity sector. Some misgivings about deregulation included a belief that there would be less attention to environmental concerns and more outages. Four per cent of the respondents said they would 'definitely' switch to an alternative supplier of electricity, while 25 per cent said they would 'probably' switch to an alternative supplier of electricity. 2 tabs

  19. Maritime Electric Co. Ltd. annual report, 1991

    Energy Technology Data Exchange (ETDEWEB)

    1991-01-01

    Maritime Electric Company is a Canadian investor-owned electric utility based in Prince Edward Island. Established in 1918, the Company owns and operates a fully integrated system providing for the generation, transmission, and distribution of electricity throughout the Island. Maritime Electric operates generating plants in Charlottetown and Borden, and has an equity interest in NB Power's unit in Dalhousie, New Brunswick. Its 4,400 km distribution system and 560 km transmission system are linked to the mainland power grid by two submarine cables between the Island and the province of New Brunswick. This report describes the Company's operations, power production and sales for the year, with relevant statistical information. Financial statements are also included. In 1991 increases in operating revenue were lower than forecast due to the recession. Tight control of expenses, together with higher rates allowed a satisfactory rate of return. Earnings per share were $1.79 compared to $1.61 in 1990. Demand side management initiatives were enhanced, and a customer survey indicated satisfaction with service. Plant life extension programs continued at the Charlottetown generating station.

  20. Maritime Electric Co. Ltd. annual report, 1991

    International Nuclear Information System (INIS)

    1991-01-01

    Maritime Electric Company is a Canadian investor-owned electric utility based in Prince Edward Island. Established in 1918, the Company owns and operates a fully integrated system providing for the generation, transmission, and distribution of electricity throughout the Island. Maritime Electric operates generating plants in Charlottetown and Borden, and has an equity interest in NB Power's unit in Dalhousie, New Brunswick. Its 4,400 km distribution system and 560 km transmission system are linked to the mainland power grid by two submarine cables between the Island and the province of New Brunswick. This report describes the Company's operations, power production and sales for the year, with relevant statistical information. Financial statements are also included. In 1991 increases in operating revenue were lower than forecast due to the recession. Tight control of expenses, together with higher rates allowed a satisfactory rate of return. Earnings per share were $1.79 compared to $1.61 in 1990. Demand side management initiatives were enhanced, and a customer survey indicated satisfaction with service. Plant life extension programs continued at the Charlottetown generating station

  1. Effects of geothermal energy utilization on stream biota and water quality at The Geysers, California. Final report. [Big Sulphur, Little Sulphur, Squaw, and Pieta Creeks

    Energy Technology Data Exchange (ETDEWEB)

    LeGore, R.S.

    1975-01-01

    The discussion is presented under the following section headings: biological studies, including fish, insects, and microbiology; stream hydrology; stream water quality, including methods and results; the contribution of tributaries to Big Sulphur Creek, including methods, results, and tributary characterization; standing water at wellheads; steam condensate quality; accidental discharges; trout spawning bed quality; major conclusions; list of references; and appendices. It is concluded that present operational practices at Geysers geothermal field do not harm the biological resources in adjacent streams. The only effects of geothermal development observed during the study were related to operational accidents. (JGB)

  2. Emergency management in the Swedish electricity market: The need to challenge the responsibility gap

    International Nuclear Information System (INIS)

    Palm, Jenny

    2008-01-01

    A secure energy supply is a basic need of society. Along with electricity market deregulation, a responsibility gap has arisen, where private energy companies lack economic incentives to invest in an electricity distribution grid that is secured to the level desired by society. This article discusses the emergency management strategies of municipal authorities for securing the electricity supply, according to a networked, or 'governance', control and direction structure, and how this influences the relationship between electricity companies and Swedish municipalities. The Swedish electricity system has traditionally developed in a monopoly context. Since electricity market deregulation, the responsibility for electricity supply security has become unclear; field studies of Swedish municipalities indicate that all actors still seem to be seeking to find their proper roles in the deregulated market. Municipalities still expect to exercise influence over private energy company decisions regarding prioritization of emergency power deliveries. Energy companies vacillate between emphasizing their need to regard economic factors and their sense of responsibility for providing a secure electricity supply to vital municipal functions (even though municipalities may lack contracts specifying this)

  3. Empirical Green's tensor retrieved from ambient noise cross-correlations at The Geysers geothermal field, Northern California

    Science.gov (United States)

    Nayak, Avinash; Taira, Taka'aki; Dreger, Douglas S.; Gritto, Roland

    2018-04-01

    We retrieve empirical Green's functions in the frequency range (˜0.2-0.9 Hz) for interstation distances ranging from ˜1 to ˜30 km (˜0.22 to ˜6.5 times the wavelength) at The Geysers geothermal field, Northern California, from coherency of ambient seismic noise being recorded by a variety of sensors (broad-band, short-period surface and borehole sensors, and one accelerometer). The applied methodology preserves the intercomponent relative amplitudes of the nine-component Green's tensor that allows us to directly compare noise-derived Green's functions (NGFs) with normalized displacement waveforms of complete single-force synthetic Green's functions (SGFs) computed with various 1-D and 3-D velocity models using the frequency-wavenumber integration method and a 3-D finite-difference wave propagation method, respectively. These comparisons provide an effective means of evaluating the suitability of different velocity models to different regions of The Geysers, and assessing the quality of the sensors and the NGFs. In the T-Tangential, R-Radial, Z-Vertical reference frame, the TT, RR, RZ, ZR and ZZ components (first component: force direction, second component: response direction) of NGFs show clear surface waves and even body-wave phases for many station pairs. They are also broadly consistent in phase and intercomponent relative amplitudes with SGFs for the known local seismic velocity structure that was derived primarily from body-wave traveltime tomography, even at interstation distances less than one wavelength. We also find anomalous large amplitudes in TR, TZ, RT and ZT components of NGFs at small interstation distances (≲4 km) that can be attributed to ˜10°-30° sensor misalignments at many stations inferred from analysis of longer period teleseismic waveforms. After correcting for sensor misalignments, significant residual amplitudes in these components for some longer interstation distance (≳8 km) paths are better reproduced by the 3-D velocity

  4. Electricity prices in the Finnish retail market

    International Nuclear Information System (INIS)

    Lehto, Eero

    2011-01-01

    This study focuses, firstly, on the pricing of electricity in the Finnish retail market. In particular, the impact of the ownership structure on prices is tested empirically. Secondly, the influence of low-cost electricity sources on retail prices is considered. The question about whether the average fuel costs rather than the wholesale price determine the retail prices is thus addressed. The supply side behaviour characterised may explain the passivity of client activity in the seemingly competitive Finnish market. - Research highlights: → Ownership has a strong impact on retail prices in the Finnish electricity market. → Locally owned companies' rates are 5-15 per cent lower than investor owned companies' rates. → Own low cost acquisition of electricity helps local firms to keep prices at low levels.

  5. Nitrogen oxide control at power plants of the ENEL company (Italy)

    Energy Technology Data Exchange (ETDEWEB)

    Kotler, V.R. (Vserossiiskii Teplotekhnicheskii Institut (Russian Federation))

    1993-03-01

    Analyzes experiences of the ENEL electricity company in Italy in controlling pollutant emission from fossil-fuel power plants. In 1990, the company produced 87% of the country's electricity. Until the year 2000, ENEL plans to increase coal use for power generation by 23.5% and install 9,300 MW of new coal-fired power plant capacity. New European and Italian emission standards require ENEL to reduce NO[sub x] emissions by 30% from 1986 to 1998. NO[sub x] emission values from various fuel-oil and pulverized-coal fired steam generators operated by the company are given. Modifications to existing combustion technologies and equipment installed to lower NO[sub x] content in flue gases at various ENEL power plants are considered. The most promising coal combustion technologies and ongoing research programs are pointed out. 4 refs.

  6. Stress/strain changes and triggered seismicity at The Geysers, California

    Science.gov (United States)

    Gomberg, Joan; Davis, Scott

    1996-01-01

    The principal results of this study of remotely triggered seismicity in The Geysers geothermal field are the demonstration that triggering (initiation of earthquake failure) depends on a critical strain threshold and that the threshold level increases with decreasing frequency, or, equivalently, depends on strain rate. This threshold function derives from (1) analyses of dynamic strains associated with surface waves of the triggering earthquakes, (2) statistically measured aftershock zone dimensions, and (3) analytic functional representations of strains associated with power production and tides. The threshold is also consistent with triggering by static strain changes and implies that both static and dynamic strains may cause aftershocks. The observation that triggered seismicity probably occurs in addition to background activity also provides an important constraint on the triggering process. Assuming the physical processes underlying earthquake nucleation to be the same, Gomberg [this issue] discusses seismicity triggered by the MW 7.3 Landers earthquake, its constraints on the variability of triggering thresholds with site, and the implications of time delays between triggering and triggered earthquakes. Our results enable us to reject the hypothesis that dynamic strains simply nudge prestressed faults over a Coulomb failure threshold sooner than they would have otherwise. We interpret the rate-dependent triggering threshold as evidence of several competing processes with different time constants, the faster one(s) facilitating failure and the other(s) inhibiting it. Such competition is a common feature of theories of slip instability. All these results, not surprisingly, imply that to understand earthquake triggering one must consider not only simple failure criteria requiring exceedence of some constant threshold but also the requirements for generating instabilities.

  7. Stress/strain changes and triggered seismicity at The Geysers, California

    Science.gov (United States)

    Gomberg, J.; Davis, S.

    1996-01-01

    The principal results of this study of remotely triggered seismicity in The Geysers geothermal field are the demonstration that triggering (initiation of earthquake failure) depends on a critical strain threshold and that the threshold level increases with decreasing frequency or equivalently, depends on strain rate. This threshold function derives from (1) analyses of dynamic strains associated with surface waves of the triggering earthquakes, (2) statistically measured aftershock zone dimensions, and (3) analytic functional representations of strains associated with power production and tides. The threshold is also consistent with triggering by static strain changes and implies that both static and dynamic strains may cause aftershocks. The observation that triggered seismicity probably occurs in addition to background activity also provides an important constraint on the triggering process. Assuming the physical processes underlying earthquake nucleation to be the same, Gomberg [this issue] discusses seismicity triggered by the MW 7.3 Landers earthquake, its constraints on the variability of triggering thresholds with site, and the implications of time delays between triggering and triggered earthquakes. Our results enable us to reject the hypothesis that dynamic strains simply nudge prestressed faults over a Coulomb failure threshold sooner than they would have otherwise. We interpret the rate-dependent triggering threshold as evidence of several competing processes with different time constants, the faster one(s) facilitating failure and the other(s) inhibiting it. Such competition is a common feature of theories of slip instability. All these results, not surprisingly, imply that to understand earthquake triggering one must consider not only simple failure criteria requiring exceedence of some constant threshold but also the requirements for generating instabilities.

  8. Performance-based ratemaking for electric utilities: Review of plans and analysis of economic and resource-planning issues. Volume 2, Appendices

    Energy Technology Data Exchange (ETDEWEB)

    Comnes, G.A.; Stoft, S.; Greene, N. [Lawrence Berkeley Lab., CA (United States); Hill, L.J. [Oak Ridge National Lab., TN (United States)

    1995-11-01

    This document contains summaries of the electric utilities performance-based rate plans for the following companies: Alabama Power Company; Central Maine Power Company; Consolidated Edison of New York; Mississippi Power Company; New York State Electric and Gas Corporation; Niagara Mohawk Power Corporation; PacifiCorp; Pacific Gas and Electric; Southern California Edison; San Diego Gas & Electric; and Tucson Electric Power. In addition, this document also contains information about LBNL`s Power Index and Incentive Properties of a Hybrid Cap and Long-Run Demand Elasticity.

  9. The energy efficiency partnership - Kraft General Foods and Boston Edison Company

    International Nuclear Information System (INIS)

    Crowley, J.C.; Donoghue, J.P.

    1993-01-01

    During the past twenty years, inordinate shifts in the supply and demand of energy have forced both electric utility companies and their customers to investigate new and innovative ways to satisfy the ever increasing demand for electricity. The Energy Efficiency Partnership, developed between Kraft General Foods and Boston Edison Company, presents an exemplary study of how two corporate giants creatively solved the problem of uncontrolled energy costs and its positive effect on the overall operations of Kraft General Foods, Framingham. But the Energy Efficiency Partnership did more than reduce energy costs, it provided benefits to all parties on the playing field. To understand its significance, a review of the partnership's history is paramount. The first official announcement of the Energy Efficiency Partnership was made on April 9, 1990. Framingham, MA, The Commonwealth of Massachusetts Kraft General Foods Framingham, and Boston Edison Company have joined forces in a $3.6 million dollar energy partnership that will help keep 250 industrial jobs in Massachusetts and could lead to the future expansion of the international food company's Framingham facility

  10. Strategy update in a design and consulting company

    OpenAIRE

    Kiviniemi, Juha

    2017-01-01

    The target company of the present thesis is a small engineering company specialising in electrical design. The company’s current development stage and changes in its operating environment call for a strategy up-date. The objective of this study was to formulate key conclusions based on an analysis of the company’s current strategy and its operating environment which will later act as an input to the company’s strategy process. The strategy process itself is left outside the scope of this...

  11. Ontario electricity industry restructuring : preliminary asset valuation and calculation of stranded debt

    International Nuclear Information System (INIS)

    1998-01-01

    The rationale for restructuring Ontario's electricity industry was restated. Financial elements of the Government's White Paper on the electrical industry included the following: (1) establishing a level playing field on taxes and regulation, (2) restructuring Ontario Hydro into new companies with clear business mandates, and (3) taking action to put the new companies on solid financial ground. To achieve these objectives requires valuation of the new companies as a key part in the restructuring process. This Ministry of Finance document contains preliminary estimates of the total debt and liabilities of Ontario Hydro ($ 39.1 billion), the value of the new generation and service companies ($ 15.8 billion), and the stranded debt ($ 23.3 billion, less the value of dedicated revenue streams of $ 15.4 billion, equal to the residual stranded debt of $ 7.9 billion). The method by which the stranded debt was calculated is also described. It is stressed that the overriding principles governing the financial restructuring plan are to achieve restructuring without increasing electricity rates, to retain maximum value in the electricity sector until stranded debt is retired, and to recover stranded debt from the electricity sector and not from taxpayers. Ministry advisors indicate that these preliminary valuations would allow the new companies to operate as commercial companies in a competitive market and receive investment grade credit ratings. 44 figs

  12. Organigraphs: drawing how companies really work.

    Science.gov (United States)

    Mintzberg, H; Van der Heyden, L

    1999-01-01

    Walk into any organization and you will get a snapshot of the company in action--people and products moving every which way. But ask for a picture of the company and you will be given the org chart, with its orderly little boxes showing just the names and titles of managers. Now there's a more revealing way to depict the people and operations within an organization--an approach called the organigraph. The organigraph is not a chart. It's a map that offers an overview of the company's functions and the ways that people organize themselves at work. Perhaps most important, an organigraph can help managers see untapped competitive opportunities. Drawing on the organigraphs they created for about a dozen companies, authors Mintzberg and Van der Heyden illustrate just how valuable a tool the organigraph is. For instance, one they created for Electrocomponents, a British distributor of electrical and mechanical items, led managers to a better understanding of the company's real expertise--business-to-business relationships. As a result of that insight, the company wisely decided to expand in Asia and to increase its Internet business. As one manager says, "It allowed the company to see all sorts of new possibilities." With traditional hierarchies vanishing and newfangled--and often quite complex--organizational forms taking their place, people are struggling to understand how their companies work. What parts connect to one another? How should processes and people come together? Whose ideas have to flow where? With their flexibility and realism, organigraphs give managers a new way to answer those questions.

  13. Sectoral panorama: the electric power sector in Europe

    International Nuclear Information System (INIS)

    Mons, L.

    2003-10-01

    This study takes stock on the main european markets to help the electric power companies in their decisions and investments. The first part presents the electric power sector structure in Europe. The second part is devoted to the market evolution for the different european markets (german, french, british, italian and spanish) with an analysis of the retail prices, the competition and the evolution perspectives. The third part presents the highlights in the electric power sector between 2001 and the middle of 2003. The enterprises management and strategies are presented in the fourth part. In the last part the document analyzes the financial performances of the sector and the electric power companies. (A.L.B.)

  14. Analyse Risk-Return Paradox: Evidence from Electricity Sector of Pakistan

    OpenAIRE

    Naqi Shah, Sadia; Qayyum, Abdul

    2016-01-01

    This study analyse risk return relationship of the electricity companies of Pakistan by using the log return series of these electricity companies. Financial time series data have the property of autoregressive heteroscedasticity so move towards the GARCH family test. As the study want to analyse the risk return relationship so, GARCH-M Model of Engel et al (1987) is used, who empirically found relationship between risk and return. Results show that risk return in case of Pakistan electricity...

  15. Evaluation of Electric Power Procurement Strategies by Stochastic Dynamic Programming

    Science.gov (United States)

    Saisho, Yuichi; Hayashi, Taketo; Fujii, Yasumasa; Yamaji, Kenji

    In deregulated electricity markets, the role of a distribution company is to purchase electricity from the wholesale electricity market at randomly fluctuating prices and to provide it to its customers at a given fixed price. Therefore the company has to take risk stemming from the uncertainties of electricity prices and/or demand fluctuation instead of the customers. The way to avoid the risk is to make a bilateral contact with generating companies or install its own power generation facility. This entails the necessity to develop a certain method to make an optimal strategy for electric power procurement. In such a circumstance, this research has the purpose for proposing a mathematical method based on stochastic dynamic programming and additionally considering the characteristics of the start-up cost of electric power generation facility to evaluate strategies of combination of the bilateral contract and power auto-generation with its own facility for procuring electric power in deregulated electricity market. In the beginning we proposed two approaches to solve the stochastic dynamic programming, and they are a Monte Carlo simulation method and a finite difference method to derive the solution of a partial differential equation of the total procurement cost of electric power. Finally we discussed the influences of the price uncertainty on optimal strategies of power procurement.

  16. Impact of residential PV adoption on Retail Electricity Rates

    International Nuclear Information System (INIS)

    Cai, Desmond W.H.; Adlakha, Sachin; Low, Steven H.; De Martini, Paul; Mani Chandy, K.

    2013-01-01

    The price of electricity supplied from home rooftop photo voltaic (PV) solar cells has fallen below the retail price of grid electricity in some areas. A number of residential households have an economic incentive to install rooftop PV systems and reduce their purchases of electricity from the grid. A significant portion of the costs incurred by utility companies are fixed costs which must be recovered even as consumption falls. Electricity rates must increase in order for utility companies to recover fixed costs from shrinking sales bases. Increasing rates will, in turn, result in even more economic incentives for customers to adopt rooftop PV. In this paper, we model this feedback between PV adoption and electricity rates and study its impact on future PV penetration and net-metering costs. We find that the most important parameter that determines whether this feedback has an effect is the fraction of customers who adopt PV in any year based solely on the money saved by doing so in that year, independent of the uncertainties of future years. These uncertainties include possible changes in rate structures such as the introduction of connection charges, the possibility of PV prices dropping significantly in the future, possible changes in tax incentives, and confidence in the reliability and maintainability of PV. -- Highlights: •Households who install PV reduce their electricity consumption from the grid. •Electricity rates must increase for utility companies to recover its fixed costs. •However, higher electricity rates give households more incentives to adopt PV. •We find that this feedback has significant impact on PV uptake only in later years. •Utility companies could lose a significant fraction of high consumption customers

  17. Electric distribution systems

    CERN Document Server

    Sallam, A A

    2010-01-01

    "Electricity distribution is the penultimate stage in the delivery of electricity to end users. The only book that deals with the key topics of interest to distribution system engineers, Electric Distribution Systems presents a comprehensive treatment of the subject with an emphasis on both the practical and academic points of view. Reviewing traditional and cutting-edge topics, the text is useful to practicing engineers working with utility companies and industry, undergraduate graduate and students, and faculty members who wish to increase their skills in distribution system automation and monitoring."--

  18. Generation Companies’ Operative Strategies in the Spot Electricity Market

    Directory of Open Access Journals (Sweden)

    Tovar-Hernández J.H.

    2012-07-01

    Full Text Available In traditional regulation the obligation to meet the consumer demand was assumed, this guaranteed to generation companies the full recovery of their costs. However, in order to achieve greater efficiency, reduce the price of electricity, meet the continuously growing electricity consumption, and equalize prices in different regions, a new structure of the electricity industry has been created, where electric energy is traded through a market. Generation company’s future cash flows depend on day to day market participation, in order to satisfy all of their financial and economic requirements. In this paper, future cash flows required to fulfill with economic and financial commitments by a generation company immerse in this new market structure are studied. For this purpose, future cash flows are considered to be dependent on a single asset: electricity. Several scenarios with different fuel prices are generated in order to estimate the generation company’s future cash flows. The response of the competing generation companies is taken into account at each scenario. The fuel price changes are modelled using a concurrent binary tree.

  19. Temporal changes of static stress drop as a proxy for poroelastic effects at The Geysers geothermal field, California

    Science.gov (United States)

    Staszek, Monika; Orlecka-Sikora, Beata; Lasocki, Stanislaw; Kwiatek, Grzegorz; Leptokaropoulos, Konstantinos; Martinez-Garzon, Patricia

    2017-04-01

    One of the major environmental impacts of shale gas exploitation is triggered and induced seismicity. Due to the similarity of fluid injection process data from geothermal fields can be used as a proxy for shale gas exploitation associated seismicity. Therefore, in this paper we utilize 'The Geysers' dataset compiled within SHale gas Exploration and Exploitation induced Risks (SHEER) project. The dependence of earthquake static stress drops on pore pressure in the medium was previously suggested by Goertz-Allmann et al. (2011), who observed an increase of the static stress drop with the distance from injection well during reservoir stimulation at Deep Heat Mining project in Basel, Switzerland. Similar observation has been done by Kwiatek et al. (2014) in Berlín geothermal field, El Salvador. In this study, we use a high-quality data from The Geysers geothermal field to determine whether the static stress drops and the stress drop distributions change statistically significantly in time or not, and how such changes are correlated with the values of hypocenter depth, water injection rate, and distance from injection well. For the analyses we use a group of 354 earthquakes, which occurred in the proximity of Prati-9 and Prati-29 injection wells. Spectral parameters of these earthquakes were determined using mesh spectral ratio technique. Our results indicate that: (1) the static stress drop variation in time is statistically significant, (2) median static stress drop is inversely related to median injection rate. Therefore, it is highly expected that static stress drop is influenced by pore pressure in underground fluid injection conditions. References: Goertz-Allmann B., Goertz A., Wiemer S. (2011), Stress drop variations of induced earthquakes at the Basel geothermal site. Geophysical Research Letters, 38, L09308, doi:10.1029/2011GL047498. Kwiatek G., Bulut F., Bohnhoff M., Dresen G. (2014), High-resolution analysis of seismicity induced at Berlin geothermal field

  20. The electricity market 2002

    International Nuclear Information System (INIS)

    2002-01-01

    taxes. The price of electricity dropped between 1997 and 2000, but began rising again to all electricity customers during 2000 and 2001. During the same period, the network charges remained largely unchanged, while the tax on electricity increased substantially. This led to an increase in the total cost to domestic customers, whereas the cost to industrial customers, who are exempt from taxes, is lower. The reform has enabled customers to choose freely the supplier from whom they want to buy their electricity. An opinion poll shows that most customers know that they can choose their supplier, and 37 % have acted on this by changing to a different supplier or negotiating their electricity price. The market concentration has increased in recent years since the dominating companies in Nordic countries have bought shares in competing companies on the Nordic market. The power companies and electricity trading companies are being developed towards bigger and more integrated energy companies, with operations in several countries. In recent years, the former surplus generation capacity in Sweden has been reduced. The oil-fired condensing power stations that were previously used in Sweden as reserve capacity have been decommissioned, and the first reactor in Barsebaeck was shut down. Svenska Kraftnaet, the Swedish grid utility, purchased a power reserve before the winter of 2000/2001 in order to strengthen the power balance during consumption peaks. During the autumn of 2001, the Government also entrusted Svenska Kraftnaet with the task of safe-guarding electricity generation capacity during very cold weather. This was to be done by purchasing reserve power capacity. The assignment resulted in additional power generation capacity consisting of previously decommissioned power generation plants and companies that were prepared to reduce their power consumption voluntarily. The procurement of reserve capacity is a temporary transitional measure. In the Government assignment

  1. Safety evaluation report related to the operation of Susquehanna Steam Electric Station, Units 1 and 2. Docket Nos. 50-387 and 50-388, Pennsylvania Power and Light Company and Allegheny Electric Cooperative, Inc

    International Nuclear Information System (INIS)

    1982-11-01

    In April 1981, the staff of the Nuclear Regulatory Commission issued its Safety Evaluation Report (NUREG-0776) regarding the application of the Pennsylvania Power and Light Company (the licensee) and the Allegheny Electric Cooperative, Inc. (co-licensee) for licenses to operate the Susquehanna Steam Electric Station, Units 1 and 2, located on a site in Luzerne County, Pennsylvania. Supplement 1, issued in June 1981, addressed outstanding issues. Supplement 2, issued in September 1981, contains the ACRS Report and responses. Supplement 3, issued in July 1982, contains the resolution to five items previously identified as open and closes them out. On July 17, 1982, License NPF-14 was issued to allow Unit 1 operation at power levels not to exceed 5% of rated power. This supplement discusses the resolution of several license conditions that have been met

  2. Shaping the future of electric utilities

    International Nuclear Information System (INIS)

    Byus, L.C.

    1993-01-01

    On December 14, 1992, Cincinnati Gas ampersand Electric Company (CG ampersand E) and PSI Resources, Inc. announced an agreement to merge the two companies into a newly formed company, CINergy Corp. In announcing the proposed merger, James E. Rogers Jr., chairman, president, and chief executive officer of PSI said, Our companies have chosen to shape our future and our industry. This is an ideal partnership, since our strengths complement each other and our vision of the future is the same. Will this merger be the first of many that will shape the future of the electric utility in the United States? What is the vision of the future for the industry? About five years ago, a well-known Wall Street utility analyst traveled around the country talking about the anticipated consolidation of electric utility companies in the US His motto was Fifty in Five, meaning widespread consolidation that would reduce the number of independent investor-owned utilities from more than 100 to 50 within a five-year period. He even developed a map showing the mergers/consolidations he looked for and actually named names. More than five years have passed, and only a handful of utility mergers have taken place. But, looking forward from 1992, restructuring of the utility industry is very much a vision of the future. What is the driving force? The National Energy Policy Act of 1992 provides the legislative framework for the electric utility industry in the US in future years. While the specific rules that will govern the industry are yet to be promulgated, the intent to allow (even promote) competition is evident in the Act itself. But it appears the vision of the future is market driven

  3. Sale of electricity to households

    International Nuclear Information System (INIS)

    Anon

    2011-01-01

    The Company Slovenske elektrarne (SE) Predaj has after two years of presence in the market expanded their business activities to the households segment. The first customers can be particularly employees of Slovenske elektrarne. This chance will be provided to them starting from 1 October of this year. 'The electricity supplies for households will only be supplementary segment of sales at SE Predaj Company. We will still focus mainly at businesses with higher consumption,' says director of the Company Mr. Stanislav Reguli. (author)

  4. Company profile VUJE

    International Nuclear Information System (INIS)

    Anon

    2007-01-01

    At the present time the whole world realizes the serious need for energy for the preservation of perpetually sustainable development. A distinctive place in the life of modern society belongs to electric energy,its safe production and reliable delivery according high standards of quality. When our company was established 30 years ago, we assumed research and development challenges directly related to the safe, reliable and economical production of electric energy from nuclear power plants, as well as the elimination of potential negative influences on the environment and employees. During our existence, we have gradually expanded our activities and specializations. Our first job was ti train plant personnel. We trained specialists to meet the needs not only of (what was then) Czechoslovakia, but also of Germany and Hungary. Gradually, we also met the problems of processing and storing radioactive waste, maintaining the service-life of our equipment and deactivating and disposing of contaminated devices at the end their operating lives. Industry requirements and concerns led use to broaden our services in energy production to include renewable sources of energy. Our youngest division of activity deals with the distribution of hydro-electrical energy via the electric grid. By continually updating the specialized skills of our employees and by investing in the latest equipment, our challenges and operational issues in the energy sector. Responding to developmental trends and the requirements of our consumers, we have established a system of quality management, which complies with the ISO 9001 and 14001 standards certified by the LRQA Corporation of Great Britain. Throughout the years, our company has been consistently proving to the operators of power facilities, both in Slovakia and abroad, our viability and high, innovative potential, in recognition of this, in 2005, when we participated in the sixth EU Framework Programme in R and D, the Slovak Ministry of

  5. Company profile VUJE

    International Nuclear Information System (INIS)

    Anon

    2007-01-01

    At the present time the whole world realizes the serious need for energy for the preservation of perpetually sustainable development. A distinctive place in the life of modern society belongs to electric energy,its safe production and reliable delivery according high standards of quality. When our company was established 30 years ago, we assumed research and development challenges directly related to the safe, reliable and economical production of electric energy from nuclear power plants, as well as the elimination of potential negative influences on the environment and employees. During our existence, we have gradually expanded our activities and specializations. Our first job was ti train plant personnel. We trained specialists to meet the needs not only of (what was then) Czechoslovakia, but also of Germany and Hungary. Gradually, we also met the problems of processing and storing radioactive waste, maintaining the service-life of our equipment and deactivating and disposing of contaminated devices at the end their operating lives. Industry requirements and concerns led us to broaden our services in energy production to include renewable sources of energy. Our youngest division of activity deals with the distribution of hydro-electrical energy via the electric grid. By continually updating the specialized skills of our elmasil and by investing in the latest equipment, our challenges and operational issues in the energy sector. Responding to developmental trends and the requirements of our consumers, we have established a system of quality management, which complies with the ISO 9001 and 14001 standards certified by the LRQA Corporation of Great Britain. Throughout the years, our company has been consistently proving to the operators of power facilities, both in Slovakia and abroad, our viability and high, innovative potential, in recognition of this, in 2005, when we participated in the sixth EU Framework Programme in R and D, the Slovak Ministry of Education

  6. Project of law modified by the Senate relative to the electric and gas public utilities and to the electric and gas companies; Projet de loi modifie par le Senat relatif au service public de l'electricite et du gaz et aux entreprises electriques et gazieres

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-07-01

    This project of law aims to adapt the electricity and gas sector to the new economical context of opening of the energy markets to competition. It gives to energy companies the internal organization base necessary to warrant a high level of service and a transparent and non-discriminatory access of third parties to transport and distribution networks. These evolutions will allow Electricite de France (EdF) and Gaz de France (GdF) companies to compete on equal terms with their European competitors. It confirms first the prime role of public utility of both companies and then transposes the dispositions of the European directives relative to the organization of EdF and GdF integrated companies. It foresees the creation of two daughter companies for the management of energy transport activities. The project of law foresees also the change of the status of EdF and GdF companies and the reform of the retirement pensions of the personnel. This report presents the modifications added by the Senate to the text of law adopted at first reading by the House of Commons. (J.S.)

  7. Lifeline electric rates and alternative approaches to the problems of low-income ratepayers. Ten case studies of implemented programs

    Energy Technology Data Exchange (ETDEWEB)

    1980-07-01

    Program summaries, issue developments, governmental processes, and impacts are discussed for 10 case studies dealing with lifeline electric rates and alternative approaches to the problems of low-income ratepayers, namely; the Boston Edison rate freeze; the California lifeline; Florida Power and Light conservation rate; the Iowa-Illinois Gas and Electric small-use rate; the Maine demonstration lifeline program; the Massachusetts Electric Company A-65 rate; the Michigan optional senior citizen rate; the Narragansett Electric Company A-65 SSI rate; the Northern States Power Company conservation rate break; and the Potomac Electric Power Company rate freeze. (MCW)

  8. Grid Integration of Electric Vehicles in Open Electricity Markets

    DEFF Research Database (Denmark)

    congestion management scenario within electric distribution networks •optimal EV charging management with the fleet operator concept and smart charging management •EV battery technology, modelling and tests •the use of EVs for balancing power fluctuations from renewable energy sources, looking at power......Presenting the policy drivers, benefits and challenges for grid integration of electric vehicles (EVs) in the open electricity market environment, this book provides a comprehensive overview of existing electricity markets and demonstrates how EVs are integrated into these different markets...... of the technologies for EV integration, this volume is informative for research professors and graduate students in power systems; it will also appeal to EV manufacturers, regulators, EV market professionals, energy providers and traders, mobility providers, EV charging station companies, and policy makers....

  9. 78 FR 11633 - Application To Export Electric Energy; ConocoPhillips Company

    Science.gov (United States)

    2013-02-19

    ... DEPARTMENT OF ENERGY [OE Docket No. EA-336-A] Application To Export Electric Energy; Conoco..., DOE issued Order No. EA-336, which authorized CoP to transmit electric energy from the United States... facilities to the transmission grid. CoP states that all of the electric energy that CoP proposes to export...

  10. A method for short term electricity spot price forecasting

    International Nuclear Information System (INIS)

    Koreneff, G.; Seppaelae, A.; Lehtonen, M.; Kekkonen, V.; Laitinen, E.; Haekli, J.; Antila, E.

    1998-01-01

    In Finland, the electricity market was de-regulated in November 1995. For the electricity purchase of power companies this has caused big changes, since the old tariff based contracts of bulk power supply have been replaced by negotiated bilateral short term contracts and by power purchase from the spot market. In the spot market, in turn, there are at the present two strong actors: The electricity exchange of Finland and the Nordic power pool which is run by the Swedish and Norwegian companies. Today, the power companies in Finland have short term trade with both of the electricity exchanges. The aim of this chapter is to present methods for spot price forecasting in the electricity exchange. The main focus is given to the Finnish circumstances. In the beginning of the presentation, the practices of the electricity exchange of Finland are described, and a brief presentation is given on the different contracts, or electricity products, available in the spot market. For comparison, the practices of the Nordic electricity exchange are also outlined. A time series technique for spot price forecasting is presented. The structure of the model is presented, and its validity is tested using real case data obtained from the Finnish power market. The spot price forecasting model is a part of a computer system for distribution energy management (DEM) in a de-regulated power market

  11. A method for short term electricity spot price forecasting

    Energy Technology Data Exchange (ETDEWEB)

    Koreneff, G; Seppaelae, A; Lehtonen, M; Kekkonen, V [VTT Energy, Espoo (Finland); Laitinen, E; Haekli, J [Vaasa Univ. (Finland); Antila, E [ABB Transmit Oy (Finland)

    1998-08-01

    In Finland, the electricity market was de-regulated in November 1995. For the electricity purchase of power companies this has caused big changes, since the old tariff based contracts of bulk power supply have been replaced by negotiated bilateral short term contracts and by power purchase from the spot market. In the spot market, in turn, there are at the present two strong actors: The electricity exchange of Finland and the Nordic power pool which is run by the Swedish and Norwegian companies. Today, the power companies in Finland have short term trade with both of the electricity exchanges. The aim of this chapter is to present methods for spot price forecasting in the electricity exchange. The main focus is given to the Finnish circumstances. In the beginning of the presentation, the practices of the electricity exchange of Finland are described, and a brief presentation is given on the different contracts, or electricity products, available in the spot market. For comparison, the practices of the Nordic electricity exchange are also outlined. A time series technique for spot price forecasting is presented. The structure of the model is presented, and its validity is tested using real case data obtained from the Finnish power market. The spot price forecasting model is a part of a computer system for distribution energy management (DEM) in a de-regulated power market

  12. 78 FR 50409 - Kansas Municipal Energy Agency v. Sunflower Electric Power Corporation, Mid-Kansas Electric...

    Science.gov (United States)

    2013-08-19

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. EL13-84-000] Kansas Municipal Energy Agency v. Sunflower Electric Power Corporation, Mid-Kansas Electric Company, LLC, Southwest... 306 of the Federal Power Act, 16 U.S.C. 824e and 825e and Rule 206 of the Federal Energy Regulatory...

  13. The new tariff model based on marginal costs developing concept for Brazilian electric sector. A case study for Power and Light Company of Sao Paulo State (Brazil)

    International Nuclear Information System (INIS)

    Correia, S.P.S.

    1991-01-01

    A new methodology for power generation cost accounts in Brazilian electric sector is described, with the application of marginal costs theory and its deviation in developing economies. A case report from a Brazilian Power and Light Company is studied, focalizing the seasoning, the planning, the tariff model and the power generation, transmission and distribution. (M.V.M.). 19 refs, 28 figs, 1 tab

  14. A definition model of electric power tariff based on marginal cost: case study at CERON - the electric company of Rondonia, Brazil; Um modelo de definicao de tarifa de energia eletrica baseada no custo marginal: estudo de caso na CERON - Centrais Eletricas de Rondonia, Brasil

    Energy Technology Data Exchange (ETDEWEB)

    Domiciano, Jose Antonio

    2002-07-01

    The present competition circumstances (ambient) require enterprises (companies or undertaking) like CERON to have understanding of all conditions to propose tariffs which give correct signal the consumers. Objective. Thus, search for valuations of model to define the tariff of electric energy based on marginal cost though a study in case of CERON. Method. Develop an investigation of a model of definition of tariffs of electric energy based on marginal costs to start the study in case of CERON and followed by analysis of its tariff structure. Results. With application of the signal (sign or indication) of tariffs, can measure the degree of separation of tariffs and to propose new modalities of alternate tariffs which offer conditions to reflect the real form of costs imposed by clients who form subgroups of tariffs of CERON. With final results, it offers parameters to trace (seek) important strategy for the company. Conclusion: The model gives condition's to identify and quantify of subsidies inside the tariff structure. It is a base which permits to create alternatives to resolve tariff distortions. It permits to have a better understanding which category (class) of consumers who are free will try to seek companies with tariffs which reflect really its costs. (author)

  15. A definition model of electric power tariff based on marginal cost: case study at CERON - the electric company of Rondonia, Brazil; Um modelo de definicao de tarifa de energia eletrica baseada no custo marginal: estudo de caso na CERON - Centrais Eletricas de Rondonia, Brasil

    Energy Technology Data Exchange (ETDEWEB)

    Domiciano, Jose Antonio

    2002-07-01

    The present competition circumstances (ambient) require enterprises (companies or undertaking) like CERON to have understanding of all conditions to propose tariffs which give correct signal the consumers. Objective. Thus, search for valuations of model to define the tariff of electric energy based on marginal cost though a study in case of CERON. Method. Develop an investigation of a model of definition of tariffs of electric energy based on marginal costs to start the study in case of CERON and followed by analysis of its tariff structure. Results. With application of the signal (sign or indication) of tariffs, can measure the degree of separation of tariffs and to propose new modalities of alternate tariffs which offer conditions to reflect the real form of costs imposed by clients who form subgroups of tariffs of CERON. With final results, it offers parameters to trace (seek) important strategy for the company. Conclusion: The model gives condition's to identify and quantify of subsidies inside the tariff structure. It is a base which permits to create alternatives to resolve tariff distortions. It permits to have a better understanding which category (class) of consumers who are free will try to seek companies with tariffs which reflect really its costs. (author)

  16. Electric power monthly

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Sandra R.; Johnson, Melvin; McClevey, Kenneth; Calopedis, Stephen; Bolden, Deborah

    1992-05-01

    The Electric Power Monthly is prepared by the Survey Management Division; Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA), Department of Energy. This publication provides monthly statistics at the national, Census division, and State levels for net generation, fuel consumption, fuel stocks, quantity and quality of fuel, cost of fuel, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fuel are also displayed for the North American Electric Reliability Council (NERC) regions. Additionally, statistics by company and plant are published in the EPM on capability of new plants, new generation, fuel consumption, fuel stocks, quantity and quality of fuel, and cost of fuel.

  17. Local authorities and electricity producers and distributors in France before the nationalization

    International Nuclear Information System (INIS)

    Fernandez, A.

    2008-01-01

    From the start, the cooperation between power companies and local authorities was unavoidable and necessary. Cities, holding the licensing authority, could achieve a kind of power to direct the electrical economy - a role that was reinforced when electricity was acknowledged as a public interest service - while they were, as potential public lighting consumers, a business partners to emerging power companies. However, not many local authorities handled electricity management directly in France. There were ideological and legal restrictions, until 1917, or even 1926, to direct management company incorporation. Yet the financial factor - the issue of the cost of setting up or taking over the operation - was also important : there may be like a 'city optimum' that very few cities could play. Undoubtedly, failing private investors, there were a little more city or inter-city companies in rural areas, after the Government decided to subsidize them in the Twenties. By the way considering the logic of the electrical economy, city companies, even in major cities, had to count on private producers to ensure most of their supplies. In the Thirties, the Federation Nationale des Collectivites Concedantes et Regies acted as a pressure group to defend the cities' interests against power companies that were mainly engaging in a relationship with the Government. (author)

  18. Analysis of electricity price in Danish competitive electricity market

    DEFF Research Database (Denmark)

    Hu, Weihao; Chen, Zhe; Bak-Jensen, Birgitte

    2012-01-01

    electricity markets in some ways, is chosen as the studied power system. 10 year actual data from the Danish competitive electricity market are collected and analyzed. The relationship among the electricity price (both the spot price and the regulation price), the consumption and the wind power generation...... in an electricity market is investigated in this paper. The spot price and the regulation price generally decrease when the wind power penetration in the power system increases or the consumption of the power system decreases. The statistical characteristics of the spot price and the regulation price for different...... consumption periods and wind power penetration are analyzed. Simulation results show that the findings of this paper are useful for wind power generation companies to make the optimal bidding strategy so that the imbalance cost of trading wind power on the electricity market could be reduced....

  19. Electricity supply in Sweden 1983

    International Nuclear Information System (INIS)

    1984-01-01

    The year 1983 was characterized by a continued decrease in oil consumption and an increase in electricity consumption. Totally the supply of fuels decreased from 278TWh to 264 TWh in 1983. The electricity supply increased from 99.9 TWh in 1982 to 110.8 TWh in 1983. The consumers total energy use decreased from 358 TWh in 1982 to 355 TWh in 1983. Electricity consumption excluding transmission losses increased from 91,4 TWh in 1982 to 101.1TWh in 1983. The increase was due to electric space heating disconnectable electric boilers and to industry. At the end of 1983 the electric heating subscriptions are estimated to corresponds to 45 percent of all one-family houses. Hydropower accounted for 54 percent and nucler power accounted for 34 percent of the total supply of electricity in 1983. The highest hourly load during 1983 amounted to 20862 MW. The lowest load during 1983 amounted to 5185 MW. Ten nuclear power units were in commercial operation during the year. The energy availability figures were as follows: Barsebaeck 1 85 percent, Barsebaeck 2 82 percent, Forsmark 1 84 percent, Forsmark 2 88 percent, Oskarshamn 1 87 percent, Oskarshamn 2 83 percent, Ringhals 1 59 percent and Ringhals 2 68 percent. The production of electricity from conventional thermal power stations was only 4.0 TWh. Back pressure power in industry contributed 2.5 TWh of this figure and combined power and district heating stations 1.3 TWh. Two coal fired combined power and district heating plants were added and sevearl combined power and district heating plants have been rebuilt to be coal fired. The high voltage power grid system permits joint operation by all the power companies in the country, and the major power companies utilize the network for exchanging surplus power with other power companies. An account of the public debate on energy in Sweden during 1983 is also given.(L.E.)

  20. 78 FR 47235 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2013-08-05

    ... cycle counts of those LLPs to account for the additional low cycle fatigue (LCF) life consumed during... Boeing 747-8 flight tests had consumed more cyclic life than they would have in revenue flight cycles... Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of proposed...

  1. When companies produce their own energy. Opportunities and risks; Wenn Unternehmen ihre Energie selbst erzeugen. Chancen und Risiken

    Energy Technology Data Exchange (ETDEWEB)

    Hergass, Andreas [Ensys AG, Frankfurt am Main (Germany)

    2013-05-15

    More and more companies are considering the option of electricity self-supply. According to a survey conducted by the German Chamber of Industry and Commerce, 5% of all German companies have already taken the step of becoming a self-supplier and another 10% are contemplating it. However investments to this end must be planned with precision. In many cases they fail to pay off because the costs of procurement, operation and maintenance of power production plants stand in direct competition with the prices that energy trading companies can achieve in the electricity market. For companies that have committed themselves to the principles of sustainability and ecology in their corporate philosophy, having their own electricity supply will be important regardless of its profitability. In any case however they will have a requirement for partners to help ensure that internal and external energy supply systems are optimally integrated with each other.

  2. The creation of a global electricity market

    International Nuclear Information System (INIS)

    DePinto, D.; Anderson, A.

    1998-01-01

    The global embrace of market-based economics has led to significant growth and prosperity resulting in increased needs for electricity. The burgeoning demand for energy has created requirements for capital investment at time when the state-owned energy companies cannot provide it. Governments, busy trying to find ways to manage already inflated debt burdens, have little capacity for funding the capital needed to expand energy production. In these strategic industries, governments are beginning to embrace the principles of free market capitalism and private ownership, recognizing the significant benefits to be realized: reduced national deficits, a more efficient energy sector, access to foreign capital, greater internal capital generation, and more energy to fuel economic growth. This is driving the governments to embrace privatization and is creating a market for the sale of electric utilities. On the other side of this equation are the fast developing global electric companies that are prepared to expand in both developing and developed countries through significant acquisitions of either companies or strategic assets. This scenario is further enhanced as the Independent Power Developers chase projects from Brazil to China and bring competition to the development of new generation. Never before has there been such a movement to the complete transformation of the energy industry. Countries on every continent are exploring how they can reform and restructure the energy sector. The analysis will address: Global transformation sweeping the various regions of the world; Impact on developers and the strategy required for success; Global electric companies and their impact on the transformation process; and Future of the electric power industry: Will it bring the world closer together?

  3. Assessment of the prevalence of occupational accidents and their influential actors in an electricity distribution company during a five-year period.

    Science.gov (United States)

    Sadeghain, Marzieh; Farid, Ramin Ataei; Dormohammadi, Ali; Aghaei, Habib Allah; Rahmani, Abdolrasoul; Farhadi, Rozita; Eskandari, Rasoul; Karchani, Mohsen

    2013-01-01

    Occupational accidents have been considered as one of the most important crippling factors contributing to disabilities and life-threatening situations in many countries. This study was conducted to survey the prevalence of occupational accidents and the factors of that lead to injuries in an Electricity Distribution Company during a five-year period. In this descriptive study, the accident report form included items asking about the season of the year when the accident occurred, the ages and the average age of those injured, the type of employment, work experience, nature of the injuries that occurred, parts of the body affected, treatments that were applied, average number of days lost per accident, the levels of education of those involved, and their marital status. Data was analyzed using SPSS. A total of 66 Electricity Distribution Company workers were determined to be suffering from injuries due to accidents. The accidents mostly occurred in the summer (33%). Most of the injured workers (16.7%) belonged to the age groups of 25 to 29 and 40 to 44; there were no accidents reported for workers who were less than 20. About 48% of the accident victims had to be hospitalized. Furthermore, 35% of the accident victims were treated in outpatient clinics, and 7.4% of the accident victims died. We demonstrated that there were significant relationships between: 1) marital status and accidental injuries (P0.05) or work experience and the distribution of the accidents (P>0.05). This study indicated that most of the injuries in these accidents were related to the nature of employment, marital status, and level of education. The results showed the necessity for providing appropriate safety training for the workers.

  4. History of electric power technological innovation in 2017

    International Nuclear Information System (INIS)

    Yamaguchi, Hiroshi; Okabe, Kazuhiko; Ichimura, Yasunori

    2017-01-01

    This is an overview of the electric power technology innovation of 12 electric power companies in 2016. Among them, this paper outlines the technological contents related to nuclear power of three major companies. TEPCO group applied a sealant from the outside to the back-up seal of reactor containment vessel that had deteriorated. It developed a good sealing system by combining with an improved sealant, and confirmed the effect at an experimental level. Regarding environmental restoration in Fukushima, TEPCO developed a personal dosimetry technology, environmental monitoring technology, and a technology to simulate radiation reduction amount after decontamination. Chubu Electric Power Company conducted researches on the applicability of the start-up range neutron monitor count rate prediction method related to fuel loading after a long-term shut-down of nuclear power generation, basic examination for practical use of laser decontamination, and possibility of tsunami prediction using satellite positioning information. With regard to the decommissioning measures of nuclear power plants, Japan Nuclear Power Electric Generation Co., Ltd. conducted studies on the decommissioning work of the Tokai Power Station, the safe dismantling method of the Tsuruga Power Station Unit 1 as decommissioning measures and fuel management, and the disposal method of radioactive contaminants. In the development of future reactor, this company conducted research on the development of fast breeder reactor system, etc. (A.O.)

  5. On the legal nature of electricity supply contracts concluded by electricity companies and power stations generating electricity from renewable energy sources

    International Nuclear Information System (INIS)

    Herrmann, B.J.

    1998-01-01

    Section 2 of the German Act for enhanced use of electricity from renewable energy sources (StEG) defines the obligation to contract but not the contractual obligations, i.e. the conditions of performance of the contract (supply and purchase of electricity and the legal obligations of contractors). The analysis here shows that characterising this mandatory contract required by the act as an agreement of purchase and sale more appropriately describes the legal nature of the contract and the intent of the legislator than other contracts for supply and purchase of electricity, as for instance those concluded by electric utilities and their customers. One specific aspect elaborated by the author is that the StEG does not constitute an obligation to supply on the part of the renewable energy generating power station, so that the power station operator is not obliged to ensure availability of the electricity at any time or in terms of supplies that can be called off by the purchasing utility, whereas the electric utility is obliged by section 2 of the StEG to purchase the contractual amounts from the generating station. (orig./CB) [de

  6. Outsourcing services in electricity distribution network industry; Ostopalveluiden kaeyttoe verkkoliiketoiminnassa

    Energy Technology Data Exchange (ETDEWEB)

    Aminoff, A.; Lappetelaeinen, I. (VTT Technical Research Centre of Finland, Espoo (Finland)); Partanen, J.; Viljainen, S.; Tahvanainen, K. (Lappeenranta Univ. of Technology (Finland)); Jaerventausta, P.; Trygg, P. (Tampere Univ. of Technology (Finland))

    2009-02-15

    This report examines purchased services in the electricity distribution industry. The report is specially directed to readers working in the industry or otherwise interested in it. This report is a result of a research study that was done in 2008 by VTT, Lappeenranta University of Technology and Tampere University of Technology. The authors are thankful for funders and companies that made this research possible and provided lot of information and knowledge. We appreciate the participants in the steering group as well as the companies and people who answered to questionnaires, gave interviews and took part in GDSSinnovation session. In the business of electricity distribution the usage of purchased services has been increasing during the past years and network companies have focused more on their core business processes. There are a couple of peaks in the number of new purchasing decisions in the middle of the 90s and in the beginning of 2000. The most popular purchased services are network construction and maintenance services. On the other hand, many network planning related activities are still done in-house by the network companies, and are considered their core business. There are some industry specific factors that affect to the decision on whether or not to buy the service outside the company and how to cooperate with the suppliers. For instance, many network companies are owned by municipalities and many service providers are owned by the network companies. The former issue may sometimes bring local politics into the decision-making of the network companies. The latter issue, in turn, has an impact on the relationship between the customer and the supplier, and the infra-organizational issues may sometimes complicate the service purchasing process. Electricity network companies also have natural monopoly positions in their operating areas. To prevent the abuse of monopoly positions, the network companies are subjected to economic regulation. This affects

  7. Information Centre and ``Cockpit`` of a modern electricity supply company: the data warehouse; Informationszentrale und ``Cockpit`` eines modernen EVU: das Data Warehouse

    Energy Technology Data Exchange (ETDEWEB)

    Kuebert, K. [Unterfraenkische Ueberlandzentrale (UUEZ), Luelsfeld (Germany); Gimenez, O. [Franken-Data GmbH, Erlangen (Germany)

    1999-06-14

    Electricity supply companies have a big advantage: They continuously measure consumer behaviour, thanks to network control systems, centralised multistations and remote meter reading. However, they do not combine this data on a consistent basis frequently enough to be able to draw valuable consequences for sales and marketing. One of the few exceptions in the Unterfraenkische Ueberlandzentrale, UUeZ (Lower Franconian Electricity Supply Company). At UUeZ, the meter readings from each individual load profile meter built into the plant of customers with special contracts, are fed together into a `cockpit`. Assisted by a Data-Warehouse-Solution from FrankenData GmbH, an ingenious information system that enables longterm trends and optimisation potential to be recognised immediately was implemented. The benefits for electricity suppliers: A constant load factor and reduction of peaks, improved customer contact as well as more precise information at negotiations and therefore more advantageous contracts. Customers also benefit from the new system: They receive more economical tariffs and detailed reports about their consumer behaviour, which they can then optimise by taking appropriate measures. (orig.) [Deutsch] Energieversorgungsunternehmen haben gegenueber anderen Unternehmen den Vorteil, dass sie das Verbraucherverhalten dank Netzleitsystemen, Roundsteuerung und neuerdings auch Zaehlerfernablesung kontinuierlich messen. Allerdings fuehren sie diese Daten meist nicht konsequent genug zusammen, um daraus wertvolle Schluesse fuer Vertrieb und Marketing zu ziehen. Eine der wenigen Ausnahmen ist die Unterfraenkische Ueberlandzentrale (UUeZ). Bei der UUeZ laufen die Zaehlwerte von jedem einzelnen Lastprofilzaehler, der in die Anlagen der Sondervertragskunden eingebaut ist, in einem `Cockpit` zusammen. Mit Hilfe einer Data-Warehouse-Loesung der FrankenData GmbH wurde ein ausgekluegeltes Informationssystem realisiert, das langfristige Trends und Optimierungspotentiale sofort

  8. 77 FR 74548 - North Shore Railroad Company-Acquisition and Operation Exemption-PPL Susquehanna, LLC

    Science.gov (United States)

    2012-12-14

    ... Railroad Company--Acquisition and Operation Exemption--PPL Susquehanna, LLC North Shore Railroad Company...., that PPL Susquehanna, LLC (PPLS), and Allegheny Electric Cooperative, Inc. (AEC), the owners of the... extends to an interchange with Norfolk Southern Railway. North Shore states that it provides the only...

  9. an assessment of billing electricity consumers via analogue meters

    African Journals Online (AJOL)

    DR. AMINU

    ABSTRACT. This paper assesses the perception of billing consumers via analogue meter in Kano Electricity ... the successor companies of Power Holding Company ... Nassarawa computer center was established in 1991. .... The value 7.2 is.

  10. Competition and monopolies, exclusive rights for electricity companies

    International Nuclear Information System (INIS)

    Taccoen, L.

    1993-01-01

    The European Community has decided to liberalize the electric power industry within the community abolishing state monopolies, and allowing third party access. This policy was based on until then untested free-market theories. The advantage of state monopoly was that it could guarantee security of supply - vital with a non-storable commodity such as electricity. The advantages of TPA were said to be that it would lower prices, and that the market would ensure security of supply. The United Kingdom experimented in deregulation and end-user choice. In this experiment long-term planning has suffered, all new power stations are gas-fired because of low capital cost, and the effects on the British coal industry have been catastrophic. Thus, the effect of TPA seems to be a switch to natural gas, and an increase in prices to domestic consumers. Further research is needed, rather than a switch to TPA based on ideology alone

  11. Competition and monopolies, exclusive rights for electricity companies

    Energy Technology Data Exchange (ETDEWEB)

    Taccoen, L [Electricite de France (France)

    1993-01-01

    The European Community has decided to liberalize the electric power industry within the community abolishing state monopolies, and allowing third party access. This policy was based on until then untested free-market theories. The advantage of state monopoly was that it could guarantee security of supply - vital with a non-storable commodity such as electricity. The advantages of TPA were said to be that it would lower prices, and that the market would ensure security of supply. The United Kingdom experimented in deregulation and end-user choice. In this experiment long-term planning has suffered, all new power stations are gas-fired because of low capital cost, and the effects on the British coal industry have been catastrophic. Thus, the effect of TPA seems to be a switch to natural gas, and an increase in prices to domestic consumers. Further research is needed, rather than a switch to TPA based on ideology alone.

  12. Energy companies need to cuddle their clients

    International Nuclear Information System (INIS)

    2000-01-01

    Due to a liberalized energy market in Europe more than 20% of the customers has chosen another electricity supplier. In spite of that many energy suppliers do not yet operate as client-oriented businesses, according to a report of Ernst and Young: 'Trend in Energy 2000'. Energy companies should become more active in relation management

  13. Essen Superior Court. Judgement of September 24, 1982. ('Boycott of electricity bills')

    International Nuclear Information System (INIS)

    Anon.

    1983-01-01

    The Essen Superiour Court decided by judgement published on September 24, 1982 that an electricity supply company is not, by the supply contract, obliged to his customers to do without electric energy generated from nuclear energy. Even though the basic rights of the constitution may influence the contractual relations between the electricity supply compagny and the customers, the basic rights of freedom of conscience and the right of free speech do not entitle the customer to interfere with the lawful performance of the freedom of entrepreneurial activity of the electricity supply company. (WB) [de

  14. Development, assessment, licensing, and application of RELAP5YA at Yankee Atomic Electric Company

    International Nuclear Information System (INIS)

    Husain, A.

    1984-01-01

    Since 1975, Yankee Atomic Electric Company (YAEC) has been licensed to perform LOCA analyses (large and small breaks) for PWRs. The methods are based upon the WREM package, comprised of RELAP4-MOD 3, RELAP4-FLOOD, and TOODEE-2EM. Significant efforts were expended to compare WREM models against Appendix K criteria, and to incorporate changes for compliance with the criteria and for improved representation of LOCA phenomena. /SUP 2,3,4/ This internalized capability has been used extensively for licensing the Yankee and Maine Yankee plants, and for timely resolution of LOCA issues which frequently arose. The value of this internalized analysis capability was well recognized by the Yankee management. In 1979, Yankee embarked upon another LOCA Methods Development Program. One objective was to remove extra conservatisms inherent in older codes to provide additional operational flexibility for our plants. Also, we needed a code which could be used in a production mode to provide realistic response for off-normal conditions to be used in operator training and emergency guideline assessment. This program resulted in the development of RELAP5YA. The development, assessment, licensing, and application of RELAP5YA at YAEC is briefly described in this paper

  15. Congeneration feasibility: Otis Elevator Company and Polychrome Corporation. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Fox, H.

    1982-05-01

    This report summarizes an investigation of the technical and economic feasibility of cogenerating electric and thermal power at two manufacturing plants (Otis Elevator Company and Polychrome Corporation) located on neighboring properties in Yonkers, NY. Existing electrical- and steam-producing equipment and energy consumption date are summarized. Alternative cases examined include electrical energy generation, electrical energy generation with waste heat recovery and a combined cycle case. Also reported are life cycle cost economic evaluations including simple payback period and return-on-investment indices. While it was concluded that cogeneration of heat and electricity at these industrial plant sites would not be economically viable, this detailed study provides valuable insight into the types of problems encountered when considering cogeneration feasibility.

  16. The analysis of Taiwan's residential electricity demand under the electricity tariff policy

    Science.gov (United States)

    Chen, Po-Jui

    In October 2013, the Taiwan Power Company (Taipower), the monopolized state utility service in Taiwan, implemented an electricity tariff adjustment policy to reduce residential electricity demand. Using bi-monthly billing data from 6,932 electricity consumers, this study examine how consumers respond to an increase in electricity prices. This study employs an empirical approach that takes advantage of quasi-random variation over a period of time when household bills were affected by a change in electricity price. The study found that this price increase caused a 1.78% decline in residential electricity consumption, implying a price elasticity of -0.19 for summer-season months and -0.15 for non-summer-season months. The demand for electricity is therefore relatively inelastic, likely because it is hard for people to change their electricity consumption behavior in the short-term. The results of this study highlight that demand-side management cannot be the only lever used to address Taiwan's forecasted decrease in electricity supply.

  17. Electricity reforms, democracy and technological change. (Electricity systems, 'market liberalization' reforms, internationalisation, and the need for new democratic governance system - the Danish case)

    International Nuclear Information System (INIS)

    Hvelplund, F.

    2001-07-01

    At the end of the 1990s, Danish energy policy reached a turning point because of technical challenges due to the high proportion of fluctuating wind power production and the increased cogeneration share, and because of new regulation regimes being introduced in Denmark and its neighbouring countries. In this specific historical situation, with the above background, the questions that will be analysed in this publication are as follows: 1) Which governance systems are most efficient, with regard to achieving optimal goal performance by means of the present typical uranium/fossil fuel electricity supply systems? 2) Which governance systems are the most efficient in the transformation process from the present uranium/fossil fuel electricity supply systems to renewable energy-/conservation based electricity system? 3) Which changes in goal performance of the Danish electricity supply system has the 1999 Danish electricity 'liberalization' reform induced? 4) Will the Danish electricity supply system be able to maintain its consumer ownership institutions and remain independent of the 'third party' shareholder ownership structure after the 1999 Danish 'liberalization' reform? a) Are the Danish electricity companies able to compete on the Danish electricity market with foreign suppliers? b) Will the Danish energy companies be able to compete on the market for energy capital goods, or will foreign companies, for instance German power companies, buy them? Will the Danish consumer ownership model survive? c) Will the Danish 'flat' price structure survive on the future electricity market? d) Will the 1975-2000 energy technology innovation process survive under the new market conditions? How will conditions on the German market influence this development? The relevance of these questions is particulary enhanced when seen in relation to the goals of international, and especially Danish, energy policy. The main question therefore, is: will the development outlined under 1

  18. COMPETITIVE FACTORS IN ERP SYSTEM IMPLEMENTATION: A CASE STUDY OF A COMPANY OF ELECTRIC GENERATORS

    OpenAIRE

    Prado, Emerson Luiz; Passanezi, Paula Meyer Soares

    2015-01-01

    The increasing globalization of markets and increased competitiveness has required the use of appropriate management information in decision-making of companies. The Enterprise Resource Planning (ERP) is an integrated information system widely used by managers in their decision making processes. This exploratory case study, conducted in the company Stemac S/A, aims to analyze the advantages and disadvantages of the ERP system and compares them the real needs of the company. Specifics objectiv...

  19. Electric power monthly

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    The Energy Information Administration (EIA) prepares the Electric Power Monthly (EPM) for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. This publication provides monthly statistics for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. The EIA publishes statistics in the EPM on net generation by energy source, consumption, stocks, quantity, quality, and cost of fossil fuels; and capability of new generating units by company and plant. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead.

  20. Chapter 5. The strategic plans of the Company

    International Nuclear Information System (INIS)

    1998-01-01

    In the fifth chapter of this CD ROM the strategic plans of the Slovak Electric, Plc. (Slovenske elektrarne, a.s.), are presented. It consist of next paragraphs (1) The programme of strategic changes (Declaration of the programme; The need for change; Major tasks; The management structure; Interconnections between the PSC target areas; The PSC projects); (2) The development of the Company (The major objectives of the Company; The energy plan of Slovakia; Analysis of development Alternatives; Results of the analysis; Economic comparison of the alternatives; Development of generation, The information system; Strategic goals and legislation). (3) The quality control system

  1. Chapter 5. The strategic plans of the Company

    International Nuclear Information System (INIS)

    1997-01-01

    In the fifth chapter of this CD ROM the strategic plans of the Slovak Electric, Plc. (Slovenske elektrarne, a.s.), are presented. It consist of next paragraphs (1) The programme of strategic changes (Declaration of the programme; The need for change; Major tasks; The management structure; Interconnections between the PSC target areas; The PSC projects); (2) The development of the Company (The major objectives of the Company; The energy plan of Slovakia; Analysis of development Alternatives; Results of the analysis; Economic comparison of the alternatives; Development of generation, The information system; Strategic goals and legislation). (3) The quality control system

  2. Contribution of service companies

    International Nuclear Information System (INIS)

    Sole, L. M.; Cortes, A.

    2002-01-01

    The most influential aspect when choosing the model of contract between Client and Contractor relapses into the maturity reached by both parts. The service supplier will have to show his competence with his resume, not only technical, but also of actual actions concerning availability reliability, maintainability, security, environment and costs. That maturity may have been the reason why most of the service companies, of national scope, that carry out maintenance of nuclear power stations electricity and instrumentation nowadays, are present from the assembly and implementation phases of these nuclear power stations. (Author)

  3. Why the oil companies lost solar

    International Nuclear Information System (INIS)

    Miller, Damian

    2013-01-01

    Solar energy is a growing source of electricity supply. Oil companies including BP and Shell recognized this early on and entered the solar industry when it was still in its relative infancy. These companies invested heavily in vertically integrated solar companies that were at one point among the largest in the world. But neither BP nor Shell was successful, and they both decided to exit the solar market. This stands as a paradox since such companies have the funds, the long-term perspectives, the management systems, the multinational presence and the lobbying clout to potentially succeed in this new energy industry. Why were they not successful, and why did they ultimately exit? This paper uses innovation theory to explore the reasons why large incumbent corporations typically fail to succeed in commercializing disruptive innovations at scale. Evidence from semi-structured interviews and discussions with former employees of BP Solar and Shell Solar confirm the explanatory power of key constructs from innovation theory in accounting for the big oil companies' experience with solar technology. Ultimately, the findings suggest that oil companies would have done better to treat their solar businesses as separate stand-alone entities. - Highlights: • This paper examines why BP and Shell were not successful in solar, and exited. • It finds innovation theory to be very helpful in answering the question. • The evidence from semi-structured interviews, press reports, and archival documentation is in line with innovation theory. • Both the theory and the findings offer a different way forward for future oil and gas entrants

  4. Outlook for California's electric utility industry

    International Nuclear Information System (INIS)

    Frank, S.E.

    1996-01-01

    This article describes how the Southern California Edison Company deals with revolutionary change as the state's electricity industry reinvents itself. The topics of the article include how competition has make things better for SCEC's employees, customers, and shareholders, and an outline of the principal features of the electric utility industry in California

  5. Assessment of the prevalence of occupational accidents and their influential actors in an electricity distribution company during a five-year period

    Science.gov (United States)

    Sadeghain, Marzieh; Farid, Ramin Ataei; Dormohammadi, Ali; Aghaei, Habib Allah; Rahmani, Abdolrasoul; Farhadi, Rozita; Eskandari, Rasoul; Karchani, Mohsen

    2013-01-01

    Background: Occupational accidents have been considered as one of the most important crippling factors contributing to disabilities and life-threatening situations in many countries. This study was conducted to survey the prevalence of occupational accidents and the factors of that lead to injuries in an Electricity Distribution Company during a five-year period. Methods: In this descriptive study, the accident report form included items asking about the season of the year when the accident occurred, the ages and the average age of those injured, the type of employment, work experience, nature of the injuries that occurred, parts of the body affected, treatments that were applied, average number of days lost per accident, the levels of education of those involved, and their marital status. Data was analyzed using SPSS. Results: A total of 66 Electricity Distribution Company workers were determined to be suffering from injuries due to accidents. The accidents mostly occurred in the summer (33%). Most of the injured workers (16.7%) belonged to the age groups of 25 to 29 and 40 to 44; there were no accidents reported for workers who were less than 20. About 48% of the accident victims had to be hospitalized. Furthermore, 35% of the accident victims were treated in outpatient clinics, and 7.4% of the accident victims died. We demonstrated that there were significant relationships between: 1) marital status and accidental injuries (P0.05) or work experience and the distribution of the accidents (P>0.05). Conclusion: This study indicated that most of the injuries in these accidents were related to the nature of employment, marital status, and level of education. The results showed the necessity for providing appropriate safety training for the workers. PMID:26120397

  6. The Tokai-mura JCO criticality accident and the activities of the accident countermeasure support team of Electric Power Companies, Japan

    International Nuclear Information System (INIS)

    Ogawa, Junko

    2000-01-01

    A criticality accident occurred at the JCO Tokai-mura nuclear fuel processing plant on September 30, 1999. This accident brought the damages which were unrivaled in the history of atomic energy development in Japan, seriously influencing the citizen life to such an extent as requesting for 320,000 inhabitants within 10 kilometers radius to stay indoors for as long as 18 hours. However, it could be said that though three workers suffered fatal injuries, no substantial hazards were made upon the regional inhabitants due to little release of radioactive substances. This video recorded the activities of the Accident Countermeasure Support Team of the Electric Power Companies immediately after the accident occurred, showing the chronological overview of the particulars of the accident. (author)

  7. Electricity '93: Focussed for the future [Canadian Electrical Association annual report, 1992

    International Nuclear Information System (INIS)

    1993-01-01

    The Canadian Electrical Association annual report for 1993 is presented. The Association's objectives include providing a forum for studying, discussing, and exchanging information related to the electric utility industry; developing and promotion of policies on production, distribution, and utilization of electricity; acting as an industry advocate before the public and governments; and facilitating Canadian involvement in international activities affecting the electric utility industry. Association members include individuals, 35 corporate utilities, 35 corporate manufacturers, 180 associate companies, and representation from contractors, consultants, academia, and government. Association activities in helping utilities to control costs, sponsoring research and development, enhancing value of electricity to members' customers, and meeting public responsibilities are reviewed. Selected research and development projects are summarized and statistics on Canadian electricity production, generating capacity, energy demand, electricity prices, and exports are included. Lists of research and development projects awarded and completed in 1992 are appended. 10 figs., 2 tabs

  8. Tariffs on power supply and prices of electricity per 1st January 1994

    International Nuclear Information System (INIS)

    1994-04-01

    The document gives a survey of the most usual types of tariffs connected with the Danish electric-power distribution companies and the prices, valid per January 1st, 1994, set by individual companies and also the cost to consumers of connection to the supply network. A survey of prices set by power plant administrators with regard to the distribution companies is also included in addition to a summary of the modes of calculation in connection with wind turbines not owned by the electricity companies and descriptions of models for calculations related to decentral and industrial plants. Local conditions such as structure, economy etc. must be taken into consideration when comparing prices set by companies in several different areas. (AB)

  9. The roles played by the Canadian General Electric Company's Atomic Power Department in Canada's nuclear power program: work, organization and success in APD, 1955-1995

    International Nuclear Information System (INIS)

    Cantello, G.W.

    2003-01-01

    This thesis explores the roles played by the Canadian General Electric Company's Atomic Power Department (APD) in Canada's distinctive nuclear power program. From the establishment of APD in 1955 until the completion of the KANUPP project in Pakistan in 1972, the company's strategy encompassed the design, manufacture, and commissioning of entire nuclear power projects in Canada and abroad. APD then developed a specialized role in the design and supply of complete nuclear fuel handling systems, nuclear fuel bundles, and service work, that sustained a thriving workplace. Five key factors are identified as the reasons behind the long and successful history of the department: (1) Strong, capable and efficient management from the start, (2) Flexible organizational structure, (3) Extremely competent design group, (4) Excellent manufacturing, test, commissioning and service capabilities, (5) Correctly identifying, at the right time, the best fields in which to specialize. (author)

  10. An Optimum Solution for Electric Power Theft

    Directory of Open Access Journals (Sweden)

    Aamir Hussain Memon

    2013-07-01

    Full Text Available Electric power theft is a problem that continues to plague power sector across the whole country. Every year, the electricity companies face the line losses at an average 20-30% and according to power ministry estimation WAPDA companies lose more than Rs. 125 billion. Significantly, it is enough to destroy the entire power sector of country. According to sources 20% losses means the masses would have to pay extra 20% in terms of electricity tariffs. In other words, the innocent consumers pay the bills of those who steal electricity. For all that, no any permanent solution for this major issue has ever been proposed. We propose an applicable and optimum solution for this impassable problem. In our research, we propose an Electric power theft solution based on three stages; Transmission stage, Distribution stage, and User stage. Without synchronization among all, the complete solution can not be achieved. The proposed solution is simulated on NI (National Instruments Circuit Design Suite Multisim v.10.0. Our research work is an implicit and a workable approach towards the Electric power theft, as for conditions in Pakistan, which is bearing the brunt of power crises already

  11. An Optimum Solution for Electric-Power Theft

    International Nuclear Information System (INIS)

    Memon, A.H.; Memon, F.

    2013-01-01

    Electric power theft is a problem that continues to plague power sector across the whole country. Every year, the electricity companies face the line losses at an average 20-30% and according to power ministry estimation WAPDA companies lose more than Rs. 125 billion. Significantly, it is enough to destroy the entire power sector of country. According to sources 20% losses means the masses would have to pay extra 20% in terms of electricity tariffs. In other words, the innocent consumers pay the bills of those who steal electricity. For all that, no any permanent solution for this major issue has ever been proposed. We propose an applicable and optimum solution for this impassable problem. In our research, we propose an Electric power theft solution based on three stages; Transmission stage, Distribution stage, and User stage. Without synchronization among all, the complete solution can not be achieved. The proposed solution is simulated on NI (National Instruments) Circuit Design Suite Multisim v.10.0. Our research work is an implicit and a workable approach towards the Electric power theft, as for conditions in Pakistan, which is bearing the brunt of power crises already. (author)

  12. Users of electric heating rewarded

    Energy Technology Data Exchange (ETDEWEB)

    Haapakoski, M. [ed.

    1998-07-01

    When the building industry plunged into the deep recession of the early 1990s this did not paralyse research and development work on electric heating. In fact, IVO and power companies launched the `Electrically Heated Homes in the New Millennium` project in 1992. Its purpose was to verify the efficiency, energy economy and residential comfort of model systems using state-of-the-art electric heating technology. The research project launched six years ago is now nearing completion. Its findings indicate that electricity brings ever more unparalleled benefits when it is used for heating. These benefits involve residential comfort, ease of use and economy

  13. Citizen and consumer attitudes towards electricity industry restructuring : an Ontario (Canada) case-study

    International Nuclear Information System (INIS)

    Rowlands, I.; Parker, P.; Scott, D.

    2001-01-01

    This report examines public attitudes regarding electricity restructuring in Ontario. A survey from the Waterloo region in western Ontario provided responses to questions about attitudes towards restructuring and strategies for advancing environmental goals. A 158-item survey was sent to 1,110 individuals, between September 2000 and April 2001. A total of 474 questionnaires were answered, for a response rate of 43 per cent. It was noted that although the response rate was high, the survey may not be representative because the respondents were older, better educated, and wealthier than the general population. In addition, the respondents had previously indicated they were willing to pay $25 for a home energy evaluation, suggesting a special interest in issues regarding energy and the environment. Respondents were first asked whether they agreed, disagreed or were not sure about the need to restructure, whether a single government power company should supply electricity, or whether they were pleased to choose a power company of their choice. The respondents were then asked to rank the importance of the price of electricity, the quality of customer service, whether the electricity is generated in southern Ontario, the environmental effects of the electricity produced by the company, the reputation of the company, and reliability of electricity. Price and reliability ranked as the highest priorities by respondents. Citizens' attitudes toward premium-priced green electricity were also examined. The general conclusion was that while many respondents wanted a sustainable electricity system, most of them will look for the cheapest electricity product once the market is opened. 6 refs., 3 tabs

  14. NREL Evaluates Advanced Solar Inverter Performance for Hawaiian Electric

    Science.gov (United States)

    Companies | Energy Systems Integration Facility | NREL NREL Evaluates Advanced Solar Inverter Performance for Hawaiian Electric Companies NREL Evaluates Advanced Solar Inverter Performance for Hawaiian performance and impacts of today's advanced solar inverters, as well as proprietary feedback to the inverter

  15. Unexplained neurological events during bathing in young people: Possible association with the use of gas geysers

    Directory of Open Access Journals (Sweden)

    Singh Prabhjeet

    2008-01-01

    Full Text Available Here, we report sudden, unexplained neurological collapse in 14 young people while bathing with hot water associated with the use of liquefied petroleum gas (LPG-based water heaters (gas geysers in ill-ventilated bathrooms. None of the patients reported any circumstantial evidence of seizures or prior epilepsy. One patient developed cortical blindness and demonstrated posterior leucoencephalopathy on imaging studies. The remaining patients made rapid and excellent recovery without any residual neurological sequelae. In these cases, the results of all routine investigations, i.e., serum chemistry, brain imaging (computed tomography in 2 and magnetic resonance imaging in 10 and electroencephalography were normal. The clinical clustering of these cases in winter months with similar presentations of reversible encephalopathy probably indicates an inhalational toxin exposure. Therefore, we postulate a hypothesis that harmful emissions consisting of carbon monoxide (CO, hydrocarbon gases (HC and nitrogen oxides (NOx, produced by incomplete combustion of LPG might be responsible for the cellular injury and subsequent transient neurological deficits. Physicians should be aware of this entity in order to avoid misdiagnosis of this condition as seizures, and a public awareness should also be created regarding the proper use of these devices.

  16. Risk management of power supply in open electricity market

    International Nuclear Information System (INIS)

    Rinta-Runsala, E.; Kiviniemi, J.

    1999-12-01

    The open electricity market has increased the need of risk management in electric utilities. In this publication the concepts of risk assessment and measures mostly concentrating on market risks for power supply companies are reported. An essential past of the risk management includes the electricity derivates and trade

  17. Eaton launches EV certification for fast-growing electric vehicle market

    Energy Technology Data Exchange (ETDEWEB)

    Anon

    2011-11-15

    This paper presents Electrical Line magazine's industry news, where it covers the launch by Eaton Corporation of electric vehicle (EV) certification for the fast-growing electric vehicle market. The aim of the certification is to help homeowners locate electricians specializing in electric vehicle support. Eaton certified EV contractors will visit the residence of people interested in an EV and determine if it can support a charging station. These contractors are trained, qualified and members of Eaton's certified contractor network. The residential power stations come in a wall-mount or pedestal model that can fully charge an electric car in 6 to 24 hours, depending on the model. The article also covers a new venture by Powercheck, a Vancouver-based company, which ensures that electrical wiring in older homes is safe and complies with their insurance company's safety requirements. Powercheck examines the entire house for electrical fire hazards and produces a detailed report listing the corrective actions needed.

  18. 18 CFR 141.400 - FERC Form No. 3-Q, Quarterly financial report of electric utilities, licensees, and natural gas...

    Science.gov (United States)

    2010-04-01

    ..., Quarterly financial report of electric utilities, licensees, and natural gas companies. 141.400 Section 141..., licensees, and natural gas companies. (a) Prescription. The quarterly report of electric utilities, licensees, and natural gas companies, designated as FERC Form No. 3-Q, is prescribed for the reporting...

  19. Generating and distributing electricity economically and in large amounts for generations. Siemens - a synonym of electrical industry

    International Nuclear Information System (INIS)

    Feldenkirchen, W.

    1997-01-01

    The development of electrical engineering and the history of the Siemens company have been closely interrelated since their beginnings. Since the late 19th century, the electrical industry, by constantly extending its range of products, has turned into a sector of economy with an international reputation. Under the paradigm of assuming technological leadership, or co-leadership, in the development of electrical engineering world-wide, Siemens has had its share in this process. (orig.) [de

  20. Project of law relative to the electricity and gas public utilities and to the power and gas companies; Projet de loi relatif au service public de l'electricite et du gaz et aux entreprises electriques et gazieres

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-07-01

    This document is the definitive text of this project of law adopted by the French house of commons. The aim of this law is to allow the administrations to avoid to use their eligibility right with the opening of the electricity and gas markets to competition. It changes the juridical status of the two public utilities Electricite de France (EdF) and Gaz de France (GdF) into two anonymous companies and creates two additional companies for the management of the power and gas networks. It ensures also the transposition of the European directives from June 26, 2003 (2003/54/CE and 2003/55/CE). It contains some proper dispositions and modifies various existing French laws, in particular the law no. 46-628 from April 8, 1946 about the electricity and gas nationalization and the law no. 2000-108 from February 10, 2000 relative to the modernization and development of the electric public utility. (J.S.)

  1. Ontario electricity bill review

    International Nuclear Information System (INIS)

    O'Neill, G.

    2003-01-01

    Findings of an independent review of charges to electricity bills and recommendations to assist in the development of a standard, province-wide residential electricity bill for Ontario are discussed. The review was requested by the province's Minister of Energy in an effort to dispel growing confusion about the variations in customer billing practices used by the province's 90+ local distribution companies. Key recommendations and findings were as follows: (1)Consumer bill formats issued by local distribution companies should be more consumer-friendly, adhere to minimum design standards, adapt uniform terminology and common line charges; (2) charges on customer bills should be grouped into four standard line items, with full details available to customers: the four line items should be a basic service charge, a charge for delivering electricity to the customer, a charge for the electricity itself, and a separate charge for retiring the outstanding debt of the former Ontario Hydro; (3) bills should take advantage of opportunities for promoting province-wide energy conservation, such as encouraging the long-term use of interval meters, presenting historical consumption data on residential bills on a period-to-period basis, and education and communications initiatives. Details of the recommendations, including the calculation of the fixed and variable components of usage charges, an explanation of the concept of electricity system loss adjustments, a method for phasing in the recommendations, and the anticipated benefits to consumers are provided

  2. Electric power monthly, May 1994

    Energy Technology Data Exchange (ETDEWEB)

    1994-05-01

    The Electric Power Monthly (EPM) presents monthly electricity statistics. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. Data in this report are presented for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. This publication provides monthly statistics for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Statistics by company and plant are published on the capability of new generating units, net generation, fuel consumption, fuel stocks, quantity and quality of fuel, and cost of fossil fuels.

  3. Market (in)efficiency in valuing electric utilities-The case of Norwegian generating companies

    International Nuclear Information System (INIS)

    Kjaerland, Frode

    2010-01-01

    After deregulation of the energy market in Norway, a number of mergers and acquisitions of hydropower generating companies have taken place. However, valuation of these companies has proved controversial. From an ex-post perspective, there is support for the criticism that generation assets have been sold too cheaply. This article presents a simple valuation model providing evidence of how value has evolved. On the basis of these results, we discuss the valuation from an ex ante perspective and in the light of the market efficiency hypothesis of (Fama, 1970) and (Fama, 1991).

  4. The impact of electricity market liberalization in Turkey. 'Free consumer' and distributional monopoly cases

    International Nuclear Information System (INIS)

    Bahce, Serdal; Taymaz, Erol

    2008-01-01

    Electricity sector has grown substantially in Turkey since the early 1960s as a result of rapid industrialization and urbanization. The vertically integrated state-owned company had a legally established monopoly on the generation, transmission and distribution of electricity in Turkey. With the support and encouragement of international organizations like the World Bank, Turkey has initiated a comprehensive program to liberalize and privatize the electricity market in 2001. The liberalization of the electricity market in Turkey started in the distribution side of the market. The distribution network was divided into 21 distribution regions and in each of these, separate - initially state-owned - distribution companies have been authorized to distribute and sell electricity. The plan envisaged to complete privatization of all distribution companies until the end of 2006. This study compares the welfare implication of privatization of the distribution networks by comparing two extreme cases, a pure regional distributional monopoly case and a representative pure 'free' consumer case, with a benchmark case of administered price regulation. For this purpose, we develop a simulation model of the Turkish electricity system, and use the data on generation and distribution costs. Our simulation analysis shows that substantial welfare losses occur if the distributional companies behave as regional monopolists. Our findings reiterate the importance of regulation and market design. (author)

  5. 76 FR 27282 - Airworthiness Directives; General Electric Company CF34-10E2A1; CF34-10E5, CF34-10E5A1; CF34-10E6...

    Science.gov (United States)

    2011-05-11

    ... methods: Federal eRulemaking Portal: Go to http://www.regulations.gov . Follow the instructions for... Investigation of a General Electric Company (GE) CF34-10E turbofan engine experiencing high fan frame vibrations... likely to exist or develop in other products of the same type design. Proposed AD Requirements This...

  6. Broadband internet connection utilizing electric power cables, v. 16(61)

    International Nuclear Information System (INIS)

    Plastinovski, Jovche

    2008-01-01

    Considering the introduction of wide spread communication, once again, pay our attention to the oldest network in Macedonia(and world wide)- the electrical network. Being widespread, it can make the broadband communication available from any place that has an electrical connection. This includes the rural areas, which the commercial companies are not interested in. Since the early 80-ties the big power companies have realized the potential of the use electric network for communication. its beginning had faced with difficulties, since in order to send data via the noisy interferes with other units such as the radio and military equipment. But nowadays these obstacles are more or lass overcame. Some of the companies are using BPL (broadband power lines) communication for their daily operations, while in the same time this relatively new technology for data transfer over power lines is under heavy developing. (Author)

  7. Broadband internet connection utilizing electric power cables, v. 16(62)

    International Nuclear Information System (INIS)

    Plastinovski, Jovche

    2008-01-01

    Considering the introduction of wide spread communication, once again, pay our attention to the oldest network in Macedonia(and world wide)- the electrical network. Being widespread, it can make the broadband communication available from any place that has an electrical connection. This includes the rural areas, which the commercial companies are not interested in. Since the early 80-ties the big power companies have realized the potential of the use electric network for communication. its beginning had faced with difficulties, since in order to send data via the noisy interferes with other units such as the radio and military equipment. But nowadays these obstacles are more or lass overcame. Some of the companies are using BPL (broadband power lines) communication for their daily operations, while in the same time this relatively new technology for data transfer over power lines is under heavy developing. (Author)

  8. Simulation of power plant construction in competitive Korean electricity market

    International Nuclear Information System (INIS)

    Ahn, Nam Sung; Huh, Sung Chul

    2001-01-01

    This paper describes the forecast of power plant construction in competitive Korean electricity market. In Korea, KEPCO (Korean Electric Power Corporation, fully controlled by government) was responsible for from the production of the electricity to the sale of electricity to customer. However, the generation part is separated from KEPCO and six generation companies were established for whole sale competition from April 1st, 2001. The generation companies consist of five fossil power companies and one nuclear power company. Fossil power companies are schedule to be sold to private companies including foreign investors. Nuclear power company is owned by government. The competition in generation market will start from 2003. ISO (Independence System Operator) will purchase the electricity from the power exchange market. The market price is determined by the SMP (System Marginal Price) which is decided by the balance between demand and supply of electricity in power exchange market. Under this uncertain circumstance, the energy policy planners are interested to the construction of the power plant in the future. These interests are accelerated due to the recent shortage of electricity supply in California. In the competitive market, investors are no longer interested in the investment for the capital intensive, long lead time generating technologies. Large nuclear and coal plants were no longer the top choices. Instead, investors in the competitive market are interested in smaller, more efficient, cheaper, cleaner technologies such as CCGT (Combined Cycle Gas Turbine). Electricity is treated as commodity in the competitive market. The investor's behavior in the commodity market shows that the new investment decision is made when the market price exceeds the sum of capital cost and variable cost of the new facility and the existing facility utilization depends on the marginal cost of the facility. This investor's behavior can be applied to the new investments for the

  9. A Conceptual Model for the Creation of a Process-Oriented Knowledge Map (POK-Map and Implementation in an Electric Power Distribution Company

    Directory of Open Access Journals (Sweden)

    Babak Teimourpour

    2015-12-01

    Full Text Available Helping a company organize and capture the knowledge used by its employees and business processes is a daunting task. In this work we examine several proposed methodologies and synthesize them into a new methodology that we demonstrate through a case study of an electric power distribution company. This is a practical research study. First, the research approach for creating the knowledge map is process-oriented and the processes are considered as the main elements of the model. This research was done in four stages: literature review, model editing, model validation and case study. The Delphi method was used for the research model validation. Some of the important outputs of this research were mapping knowledge flows, determining the level of knowledge assets, expert-area knowledge map, preparing knowledge meta-model, and updating the knowledge map according to the company’s processes. Besides identifying, auditing and visualizing tacit and explicit knowledge, this knowledge mapping enables us to analyze the knowledge areas’ situation and subsequently help us to improve the processes and overall performance. So, a process map does knowledge mapping in a clear and accurate frame. Once the knowledge is used in processes, it creates value.

  10. Competitiveness through cooperation between electricity and information technology. TESLA - Information technology and electric power systems technology programme 1998-2002

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-11-01

    The electricity markets are being opened up to competition all round the world. To succeed in competition electricity sellers want new information technology tools to use in managing the sale of electricity. The network companies are aiming to step up utilization of their distribution capacity and to optimize power quality and the reliability of supply. Consumers need solutions with which they can manage their own power consumption and tendering sellers. The Nordic countries have been the first to deregulate their electricity markets. This head start in time is being made use of to generate a head start in technology. Tekes has initiated a technology programme for the years 1998 to 2002, named TESLA - Information Technology and Electric Power Systems, to promote the competitiveness of the Finnish electricity industry in changing conditions. The objective of the programme is to adapt information technology extensively to power distribution and thus develop the potential for Finland`s electricity industry to succeed on world markets. At the moment power distribution technology forms about one third of Finland`s energy technology exports. The programme is also aimed at developing new data transfer and data processing applications for companies in information technology clusters. For Finnish parties in the electricity markets the programme will produce ways and means of (1) improving management and use of distribution networks, (2) implementing competition in electricity sales, and (3) increasing the efficiency of electricity use

  11. Econometric model as a regulatory tool in electricity distribution - Case Network Performance Assessment Model

    International Nuclear Information System (INIS)

    Honkapuro, S.; Lassila, J.; Viljainen, S.; Tahvanainen, K.; Partanen, J.

    2004-01-01

    Electricity distribution companies operate in the state of natural monopolies since building of parallel networks is not cost-effective. Monopoly companies do not have pressure from the open markets to keep their prices and costs at reasonable level. The regulation of these companies is needed to prevent the misuse of the monopoly position. Regulation is usually focused either on the profit of company or on the price of electricity. In this document, the usability of an econometric model in the regulation of electricity distribution companies is evaluated. Regulation method which determines allowed income for each company with generic computation model can be seen as an econometric model. As the special case of an econometric model, the method called Network Performance Assessment Model, NPAM (Naetnyttomodellen in Swedish), is analysed. NPAM is developed by Swedish Energy Agency (STEM) for the regulation of electricity distribution companies. Both theoretical analysis and calculations of an example network area are presented in this document to find the major directing effects of the model. The parameters of NPAM, which are used in the calculations of this research report, were dated on 30th of March 2004. These parameters were most recent available at the time when analysis was done. However, since NPAM is under development, the parameters have been constantly changing. Therefore slightly changes in the results can occur if calculations were made with latest parameters. However, main conclusions are same and do not depend on exact parameters. (orig.)

  12. Electricity marketing and retailing

    International Nuclear Information System (INIS)

    Hanlon, C.

    2001-01-01

    ECNG Inc. is a full service provider of independent and objective energy advice and management services to industrial, commercial and institutional end-users of all forms of energy. ECNG manages 10 per cent of the Ontario gas market and expects a 10 per cent share of electricity (14 TWh). ECNG has a balanced portfolio with expertise in both petroleum and electricity sectors. The company has also dealt extensively with retailers, marketers, wholesalers and suppliers on issues regarding deregulation

  13. Adaptation to electricity crisis: Businesses in the 2011 Great East Japan triple disaster

    International Nuclear Information System (INIS)

    Fujimi, Toshio; Chang, Stephanie E.

    2014-01-01

    Electricity crises can spur improvements in electricity conservation that would be unachievable under normal circumstances. This paper investigates how businesses adapted to electricity shortages following the March 11, 2011, Great East Japan earthquake, tsunami, and nuclear disaster. In summer 2011, mandatory and voluntary electricity conservation measures affected nearly all of Japan, and peak hour electricity consumption was reduced by a remarkable 18% in the Tokyo region. Using statistical data from 14 business surveys conducted in 2011 and 2012, this paper identifies patterns with regard to type of adaptation, conservation requirements, economic sector, and timeframe. Results indicate that behavioral adaptations (e.g., reduction of illumination or air conditioning) were much more common than schedule adaptations (e.g., shifting production times) or hardware adaptations (e.g., installing energy-efficient devices or private generators). Adaptation patterns were very similar between mandatory and voluntary conservation areas. Manufacturing companies were more likely to implement schedule adaptations than other companies. Certain types of adaptations persisted into 2012, especially reduction of illumination and air conditioning, and installation of energy-efficient devices. These insights may be useful for informing electricity conservation policies in non-crisis contexts. - Highlights: • The electricity crisis due to the 2011 Great East Japan earthquake led the private sector to curtail electricity use substantially. • Behavioral adaptations such as reducing illumination and air conditioning were by far the most common responses. • Manufacturing companies were more likely to implement schedule adaptations than other companies. • Certain types of adaptations persisted for over a year, especially illumination and air-conditioning reduction, and energy-efficient device installation

  14. 76 FR 76155 - Nevada Hydro Company, Inc.; Notice of Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2011-12-06

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. P-14227-000] Nevada Hydro..., Motions To Intervene, and Competing Applications On July 14, 2011, the Nevada Hydro Company (Nevada Hydro... Diego Gas & Electric Company transmission line located to the south. Applicant Contact: Arnold B...

  15. Locus of Control, Death Anxiety and Length of Service of Electricity ...

    African Journals Online (AJOL)

    This study investigated the relationship between locus of control and death anxiety among staff of an electricity company (Power Holding Company of Nigeria, Plc). Enugu. The participants were 80 workers drawn from Power Holding Company of Nigeria, Plc Okpara Avenue, Enugu 40 long serving staff, 40 short serving staff ...

  16. UFISA: electric facility engineering for the service of emergy market

    International Nuclear Information System (INIS)

    Gutierrez Zapico, A.

    1997-01-01

    UFISA is the engineering company with the experience of UNION ELECTRICA FENOSA S.A. It activity began in 1990. This company offers to national and international markets the services for energy consumers and for the electricity costumers. (Author)

  17. Report from investigation committee on the accident at the Fukushima Nuclear Power Stations of Tokyo Electric Power Company

    International Nuclear Information System (INIS)

    Koshizuka, Seiichi

    2012-01-01

    Government's Investigation Committee on the Accident at Fukushima Nuclear Power Stations of Tokyo Electric Power Company published its final report on July 23, 2012. Results of investigation combined final report and interim report published on December 26, 2011. The author was head of accident accuse investigation team mostly in charge of site response, prior measure and plant behavior. This article reported author related technical investigation results focusing on site response and prior measures against tsunamis of units 1-3 of Fukushima Nuclear Power Stations. Misunderstanding of working state of isolation condenser of unit 1, unsuitability of alternative water injection at manual stop of high-pressure coolant injection (HPCI) system of unit 3 and improper prior measure against tsunami and severe accident were pointed out in interim report. Improper monitoring of suppression chamber of unit 2 and again unsuitable work for HPCI system of unit 3 were reported in final report. Thorough technical investigation was more encouraged to update safety measures of nuclear power stations. (T. Tanaka)

  18. Communications architecture for an electric company, European utility communications architecture, EURUCA

    Energy Technology Data Exchange (ETDEWEB)

    Uuspaeae, P [VTT Energy, Espoo (Finland)

    1998-08-01

    The scope of this research is integration and interoperability of various information systems and data communications for electric utilities. Utility Communication Architecture refers to an overall view of the communications needs and communication systems in an electric utility. The objective is to define and specify suitable and compatible communications procedures within the Utility and also to outside parties

  19. An analysis of the of international oil companies' strategy between 1999 and 2004

    International Nuclear Information System (INIS)

    Hache, E.

    2006-07-01

    Using data from the annual reports of eight major international oil companies (Exxon Mobil, BP, Shell, Total, Chevron Texaco, Conoco Phillips, ENI and Repsol), this study first proposes an analysis of this set of companies considered as a whole with respect to pertinent indicators (sales figure, geographical origin of this sales figure, share of gas and electricity distribution, staff, productivity, profitability, and so on) on the 1999-2004 period. Then, the author proposes analyses for each company, considering its own activities (oil and gas production, refineries, etc.) and also with respect to the others

  20. Interaction in the large energetics companies in the Republic of Macedonia (Part 3)

    International Nuclear Information System (INIS)

    Janevski, Risto

    2000-01-01

    After the disintegration of former power energetic system of Yugoslavia 1991, the Republic of Macedonia has faced enormous problems in the energetic field. It was necessary to realize all options in order to secure enough electric power for normal economic capacities function. In that course a direct involvement of five large companies, which represent very significant energetic subjects, will largely determine the future energetic conditions and circumstances in our country. These are the following companies: P.E. Electric Power Co. of Macedonia; Heat Power Co.; HEK Jugohrom; Fenimak. In this paper the energetic system of the OKTA Crude Oil Refinery from 1991-1998 is analyzed, as well as its characteristics and plans for the future development

  1. Isolation and Characterization of a Novel CO2-Tolerant Lactobacillus Strain from Crystal Geyser, UT

    Science.gov (United States)

    Santillan, E. U.; Major, J. R.; Omelon, C. R.; Shanahan, T. M.; Bennett, P.

    2013-12-01

    Capnophiles are microbes that grow in CO2 enriched environments. Cultured capnophiles generally, grow in 2 to 25% CO2, or 0.02 to 0.25 atm. When CO2 is sequestered in deep saline aquifers, the newly created high CO2 environment may select for capnophlic organisms. In this study, a capnophile was isolated from Crystal Geyser, a CO2 spring along the Little Grand Wash Fault, UT, a site being investigated as an analogue to CO2 sequestration. Crystal Geyser periodically erupts with CO2 charged water, indicating the presence of very high CO2 pressures below the subsurface, similar to sequestration conditions. Biomass was sampled by pumping springwater from approximately 10 m below the surface through filters. Filters were immediately placed in selective media within pressure vessels where they were pressurized to 10 atm in the field. Subsequent recultures produced an isolate, designated CG-1, that is most closely (99%) related to Lactobacillus casei on the strain level. CG-1 grows in tryptic soy broth, in PCO2 ranging from 0 atm to 10 atm, 40 times higher than pressures of previously cultured capnophiles. At 25 atm, growth is inhibited though survival can be as long as 5 days. At 50 atm, survival is poor, with sterilization occurring by 24 hours. Growth is optimal between pH values of 6 to 8, though sluggish if no CO2 is present. Its optimal salinity is 0.25 M NaCl though growth is observed ranging from 0 to 1 M NaCl. Growth is observed between 25o to 45o C, but optimal at 25oC. It consumes long-chained carbon molecules such as glucose, sucrose, and crude oil, and exhibits poor growth when supplied with lactate, acetate, formate, and pyruvate. The organism likely performs lactic acid fermentation as it requires no electron acceptors for growth and produces no acid, gas, and sulfide in triple sugar iron agar slants. CG-1 also expresses a variety of lipids, most notably cyclopropyl C19 (cycC19), or lactobacillic acid, characteristic of organisms belonging to the

  2. Profit maximization algorithms for utility companies in an oligopolistic energy market with dynamic prices and intelligent users

    Directory of Open Access Journals (Sweden)

    Tiansong Cui

    2016-01-01

    Full Text Available Dynamic energy pricing provides a promising solution for the utility companies to incentivize energy users to perform demand side management in order to minimize their electric bills. Moreover, the emerging decentralized smart grid, which is a likely infrastructure scenario for future electrical power networks, allows energy consumers to select their energy provider from among multiple utility companies in any billing period. This paper thus starts by considering an oligopolistic energy market with multiple non-cooperative (competitive utility companies, and addresses the problem of determining dynamic energy prices for every utility company in this market based on a modified Bertrand Competition Model of user behaviors. Two methods of dynamic energy pricing are proposed for a utility company to maximize its total profit. The first method finds the greatest lower bound on the total profit that can be achieved by the utility company, whereas the second method finds the best response of a utility company to dynamic pricing policies that the other companies have adopted in previous billing periods. To exploit the advantages of each method while compensating their shortcomings, an adaptive dynamic pricing policy is proposed based on a machine learning technique, which finds a good balance between invocations of the two aforesaid methods. Experimental results show that the adaptive policy results in consistently high profit for the utility company no matter what policies are employed by the other companies.

  3. 78 FR 32278 - Vogtle Electric Generating Station, Units 3 and 4; Southern Nuclear Operating Company; Change to...

    Science.gov (United States)

    2013-05-29

    ... Generating Station, Units 3 and 4; Southern Nuclear Operating Company; Change to Information in Tier 1, Table... Nuclear Operating Company, Inc., and Georgia Power Company, Oglethorpe Power Corporation, Municipal... Table 3.3-1, ``Definition of Wall Thicknesses for Nuclear Island Buildings, Turbine Buildings, and Annex...

  4. 77 FR 21765 - Nevada Hydro Company, Inc.; Notice of Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2012-04-11

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. P-14227-000] Nevada Hydro..., Motions To Intervene, and Competing Applications On July 14, 2011, the Nevada Hydro Company (Nevada Hydro... California Edison located north of the proposed project and to an existing San Diego Gas & Electric Company...

  5. NRC [Nuclear Regulatory Commission] staff evaluation of the General Electric Company Nuclear Reactor Study (''Reed Report'')

    International Nuclear Information System (INIS)

    1987-07-01

    In 1975, the General Electric Company (GE) published a Nuclear Reactor Study, also referred to as ''the Reed Report,'' an internal product-improvement study. GE considered the document ''proprietary'' and thus, under the regulations of the Nuclear Regulatory Commission (NRC), exempt from mandatory public disclosure. Nonetheless, members of the NRC staff reviewed the document in 1976 and determined that it did not raise any significant new safety issues. The staff also reached the same conclusion in subsequent reviews. However, in response to recent inquiries about the report, the staff reevaluated the Reed Report from a 1987 perspective. This re-evaluation, documented in this staff report, concluded that: (1) there are no issues raised in the Reed Report that support a need to curtail the operation of any GE boiling water reactor (BWR); (2) there are no new safety issues raised in the Reed Report of which the staff was unaware; and (3) although certain issues addressed by the Reed Report are still being studied by the NRC and the industry, there is no basis for suspending licensing and operation of GE BWR plants while these issues are being resolved

  6. Emergent strategies of electricity producers

    Energy Technology Data Exchange (ETDEWEB)

    Van der Woerd, F.; Lise, W.; Becker, G.

    2004-10-15

    The EU-funded research project EMELIE (Electricity Market Liberalisation In Europe) wants to provide a sound analysis of the economic and environmental impacts of the liberalisation process of the European electricity markets. The EMELIE model simulates various market scenarios. The companies in the EMELIE model are assumed to have a relatively simple strategy, i.e. profit maximisation, which is constrained by trade limitation, emission quota, and available production capacity for various technologies. The Institute for Environmental Studies (IVM) took the initiative to start a complementary line of research. At a more detailed level, we investigated business strategies from the perspective of the companies themselves: What is their dominant strategy in the process of liberalisation? Why do they behave like that? What will be the likely strategy of dominant companies in the years to come? And last but not least: how does this most likely strategy fit into the stylised EMELIE scenarios? In our analysis, we use theories about business behaviour, like the Portfolio Analysis of the Boston Consulting Group and Porter's Typology of Business Strategies. We also consider two theories that relate to company-authority interactions: Williamson's New Institutional Economics that compares market failures with government failures and Tinbergen's Theory of Economic Policy, that warns for exaggerated expectations of a single policy instrument, in this case market liberalisation. We observe that the liberalisation process has brought about a wave of mergers and acquisitions, resulting in concentrated markets. Concentration Standards of Competition Authorities decide on maximum concentration levels, not the market itself. The trend towards market concentration originates because dominant companies want to avoid price competition and consider strategic market behaviour in their best interest. These expansionist' companies prefer proven production technologies with

  7. Emergent strategies of electricity producers

    International Nuclear Information System (INIS)

    Van der Woerd, F.; Lise, W.; Becker, G.

    2004-10-01

    The EU-funded research project EMELIE (Electricity Market Liberalisation In Europe) wants to provide a sound analysis of the economic and environmental impacts of the liberalisation process of the European electricity markets. The EMELIE model simulates various market scenarios. The companies in the EMELIE model are assumed to have a relatively simple strategy, i.e. profit maximisation, which is constrained by trade limitation, emission quota, and available production capacity for various technologies. The Institute for Environmental Studies (IVM) took the initiative to start a complementary line of research. At a more detailed level, we investigated business strategies from the perspective of the companies themselves: What is their dominant strategy in the process of liberalisation? Why do they behave like that? What will be the likely strategy of dominant companies in the years to come? And last but not least: how does this most likely strategy fit into the stylised EMELIE scenarios? In our analysis, we use theories about business behaviour, like the Portfolio Analysis of the Boston Consulting Group and Porter's Typology of Business Strategies. We also consider two theories that relate to company-authority interactions: Williamson's New Institutional Economics that compares market failures with government failures and Tinbergen's Theory of Economic Policy, that warns for exaggerated expectations of a single policy instrument, in this case market liberalisation. We observe that the liberalisation process has brought about a wave of mergers and acquisitions, resulting in concentrated markets. Concentration Standards of Competition Authorities decide on maximum concentration levels, not the market itself. The trend towards market concentration originates because dominant companies want to avoid price competition and consider strategic market behaviour in their best interest. These expansionist' companies prefer proven production technologies with low variable costs

  8. Electricity portfolio management : optimal peak/off-peak allocations

    NARCIS (Netherlands)

    Huisman, R.; Mahieu, R.J.; Schlichter, F.

    2009-01-01

    Electricity purchasers manage a portfolio of contracts in order to purchase the expected future electricity consumption profile of a company or a pool of clients. This paper proposes a mean-variance framework to address the concept of structuring the portfolio and focuses on how to optimally

  9. Electricity Portfolio Management: Optimal Peak / Off-Peak Allocations

    NARCIS (Netherlands)

    R. Huisman (Ronald); R.J. Mahieu (Ronald); F. Schlichter (Felix)

    2007-01-01

    textabstractElectricity purchasers manage a portfolio of contracts in order to purchase the expected future electricity consumption profile of a company or a pool of clients. This paper proposes a mean-variance framework to address the concept of structuring the portfolio and focuses on how to

  10. Final environmental impact report. Part I. Pacific Gas and Electric Company Geysers Unit 16, Geothermal Power Plant, Lake County, California

    Energy Technology Data Exchange (ETDEWEB)

    1981-03-01

    The environmental analysis includes the following: geology, soils, hydrology, water quality, vegetation, wildlife, air resources, health and safety, noise, waste management, cultural resources, land use, aesthetics, socioeconomics, public services, transportation, and energy and material resources. Also included are: the project description, a summary of environmental consequences, and alternatives to the proposed action. (MHR)

  11. Electric power monthly, April 1991

    International Nuclear Information System (INIS)

    1991-01-01

    The Electric Power Monthly (EPM) presents monthly summaries of electric utility statistics at the national Census division, and State level. The purpose of this publication is to provide energy decision makers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. Data are given for net generation, fuel consumption, fuel stocks, quantity and quality of fuel, cost of fuel, electricity sales, revenue, and average revenue per kilowatt hour of electricity sold. Data on net generation are also displayed at the North American Electric Reliability Council (NERC) region level. Additionally, statistics at the company and plant level are published in the EPM on capability of new plants, net generation, fuel consumption, fuel stocks, quantity and quality of fuel, and cost of fuel. 6 figs., 57 tabs

  12. Public Utility Holding Company Act of 1935: 1935--1992

    Energy Technology Data Exchange (ETDEWEB)

    1993-01-15

    This report provides an economic and legislative history and analysis of the Public Utilities Holding Company Act (PUHCA) of 1935. This Act was substantially amended for the first time in 1992 by passage of the Energy Policy Act (EPACT). The report also includes a discussion of the issues which led to the amendment of PUHCA and projections of the impact of these changes on the electric industry. The report should be of use to Federal and State regulators, trade associations, electric utilities, independent power producers, as well as decision-makers in Congress and the Administration.

  13. The effect of merger and consolidation activities on the efficiency of electricity distribution regions in Turkey

    International Nuclear Information System (INIS)

    Çelen, Aydın

    2013-01-01

    In this study, we analyze the efficiency performances of Turkish electricity distribution companies throughout 2002 and 2009 in the stochastic frontier analysis (SFA) framework. Our more specific goal is to measure how the efficiency performances of the electricity distribution regions were affected by the mergers between distribution regions occurred in 2005. The results demonstrate that efficiencies of the companies serving to mostly the residential customers are higher than those of other companies. However, the positive impact of residential customers on the efficiencies decreased significantly following the mergers between electricity distribution companies. In contrast, the positive impact of higher customer density on efficiency also decreased, but insignificantly following the restructuring activities in the market in 2005. Our study also witnesses that the positive impact of the mergers on the efficiencies decreases as the proportion of sales to residential customers in regions increases. In contrast, the restructuring activities of 2005 increased equally the efficiencies of the companies serving in the regions with higher and lower customer densities. - Highlights: • We analyze efficiency performances of Turkish electricity distribution companies. • The efficiencies of companies serving to mostly residential customers are higher. • Positive impact of residential customers on the efficiencies dropped after mergers. • Positive impact of customer density also decreased, but insignificantly. • Positive impact of mergers on efficiency decreases as sales to residents increase

  14. Geothermal wells: a forecast of drilling activity

    Energy Technology Data Exchange (ETDEWEB)

    Brown, G.L.; Mansure, A.J.; Miewald, J.N.

    1981-07-01

    Numbers and problems for geothermal wells expected to be drilled in the United States between 1981 and 2000 AD are forecasted. The 3800 wells forecasted for major electric power projects (totaling 6 GWe of capacity) are categorized by type (production, etc.), and by location (The Geysers, etc.). 6000 wells are forecasted for direct heat projects (totaling 0.02 Quads per year). Equations are developed for forecasting the number of wells, and data is presented. Drilling and completion problems in The Geysers, The Imperial Valley, Roosevelt Hot Springs, the Valles Caldera, northern Nevada, Klamath Falls, Reno, Alaska, and Pagosa Springs are discussed. Likely areas for near term direct heat projects are identified.

  15. The management strategy of energetic companies before new businesses: CESP - a case study; A postura empresarial de empresas energeticas diante de novos negocios: CESP - um estudo de caso

    Energy Technology Data Exchange (ETDEWEB)

    Prado Junior, Fernando Amaral de Almeida

    1994-12-01

    This thesis focuses the new challenges which the Brazilian electric power companies have been facing towards the new market requirements. Special emphasis is given to: organizational theory; Brazilian electric power industry history; and, comparative analysis of the Brazilian electric power system regulation and legislation. A case study is presented based on the electric power company of Sao Paulo State - Southeast Brazil 60 refs., 21 figs., 37 tabs.

  16. Polish model of electric energy market-bulk energy tariff

    International Nuclear Information System (INIS)

    Malysa, H.

    1994-01-01

    The key problem of electric energy supply industry reform is gradually launching a competitive wholesale generation market since 1994. In process of this transformation the important role plays bulk energy supply tariff in electricity transactions between Polish Power Grid Company and distribution and retail supply companies (distributors). Premises, factors and constrains having influence on shaping of the bulk energy supply tariff are presented. A brief outline of economic foundation for calculation of demand charges and energy rate is given. Particular attention has been paid to description of bulk energy supply tariff structure. The scope and manner of adjustment of this tariff to circumstances and constrains in the initial stage of the wholesale electric energy market have been described as well. (author). 8 refs

  17. We can forget about cheaper electricity

    International Nuclear Information System (INIS)

    Marcan, P.

    2007-01-01

    It has happened again. At the end of the year as a kind of Christmas present the 2008 energy prices were published. But not everyone will benefit from the cabinet's interventions during negotiations with Slovak producers and major electricity suppliers. This year, households benefited from the zero price increase and in 2008 it will once again be households that will benefit from a lower increase rate. For companies, electricity prices will rise by over 10% next year. This is a paradoxical situation as in the corporate sector the traditional regional suppliers already have competition. But in the future the number of competitors should decrease. Mainly the smaller ones may disappear as the Ministry of Economy keeps changing the rules and these changes cost money. The newly introduced export charge or supervision over auctions organized by commercial electricity producers will not help to increase the trust of investors. And under these circumstances the Ministry's criticism of auctions that established the basis for a part of the electricity price for 2008 sounds strange especially as a state-owned company also took part in the auction. (authors)

  18. Competitiveness of nuclear power in Japanese liberalized electricity market

    International Nuclear Information System (INIS)

    Abe, Y.

    2006-01-01

    The liberalization of Japanese electricity market expanded to customers of over 50 kV on April 1, 2005 and more than 60% of the market has been already open. The discussion about the assistance measures of nuclear power generation in Japanese liberalization of electricity market has come to grow warmer gradually. The opinions on the competitiveness of nuclear power are inconsistency among the supporters of nuclear power. Some says that nuclear power is the most competitive, others says nuclear power require some sort of financial or political assistance in the deregulation of electricity market. In this study, based on financial statements of each Japanese electric power company, the constitution of generation cost of nuclear power is illustrated and various financial and economic characteristics, including ''merit of scale'' and the impact of new nuclear power plant construction on the finance of electric power company, are discussed. In addition, the economic features of nuclear power generation are compared with those of thermal power generation through the analysis of financial statements. Finally, support policies for nuclear power required in deregulation of electric utilities are examined in terms of fairness of competition and security of electricity supply

  19. Econometric model as a regulatory tool in electricity distribution. Case network performance assessment model

    International Nuclear Information System (INIS)

    Honkapuro, S.; Lassila, J.; Viljainen, S.; Tahvanainen, K.; Partanen, J.

    2004-01-01

    Electricity distribution companies operate in the state of natural monopolies since building of parallel networks is not cost- effective. Monopoly companies do not have pressure from the open markets to keep their prices and costs at reasonable level. The regulation of these companies is needed to prevent the misuse of the monopoly position. Regulation is usually focused either on the profit of company or on the price of electricity. Regulation method which determines allowed income for each company with generic computation model can be seen as an econometric model. In this document, the usability of an econometric model in the regulation of electricity distribution companies is evaluated. As the special case of an econometric model, the method called Network Performance Assessment Model, NPAM (Naetnyttomodellen in Swedish), is analysed. NPAM is developed by Swedish Energy Agency (STEM) for the regulation of electricity distribution companies. Both theoretical analysis and calculations of an example network area are presented in this document to find the major directing effects of the model. The parameters of NPAM, which are used in the calculations of this research report, were dated on 30th of March 2004. These parameters were most recent ones available at the time when analysis was done. However, since NPAM have been under development, the parameters have been constantly changing. Therefore slight changes might occur in the numerical results of calculations if they were made with the latest set of parameters. However, main conclusions are same and do not depend on exact parameters

  20. Becoming a First Mover in Green Electricity Supply: Corporate Change Driven by Liberalisation and Climate Change

    NARCIS (Netherlands)

    Hofman, Peter

    2003-01-01

    This paper presents a study of a trend-setting company in the electricity sector in the Netherlands and its innovative response to the combined influence of liberalisation and climate change. The company became a first mover through its invention of the concept of green electricity and the

  1. Operating an EPR: A strong asset in the future European electricity market

    International Nuclear Information System (INIS)

    Esteve, Bernard; Beutier, Didier

    2006-01-01

    Recently, two nuclear units have been decided in Europe, both EPR 1,600 MWe. In Finland, TVO Company decided to commission a reactor in 2009 on Olkiluoto site. The license was granted in February 2005 and the construction started in summer. In 2004 in France, EDF Company decided an EPR to be commissioned in 2012 at Flamanville. In both cases, national Parliament vote has given the green light. It is interesting to understand why each company has made such decision. In TVO case, the main driving factor seems to be the need of industrial consumers for low and stable electricity price in a context of growing excess demand. In EDF case, no short term demand, but rather long term electricity company strategy seems to be the main reason. The relation to national energy policy is very clear in both cases. In Finland, the 5. Nuclear Power Plant was decided: - as a key element of the energy mix to meet growing electricity needs while replacing older plants, - to ensure, together with renewables, the fulfillment of the Kyoto commitments, - to secure stable and predictable electricity price for intensive industrial consumers (for instance, paper mills), - to reduce the dependence on electricity import. Here, it is argued more broadly that EPR will be a strong asset in the future European electricity market. To support this argument, we shall describe: 1) to what extent the evolving European electricity market may call for new nuclear units, 2) specific design features explaining why EPR especially fits with expectations, 3) cost assessments giving the conditions of EPR competitiveness, 4) main elements of risk assessment and how they are dealt with. (authors)

  2. Design Process Improvement for Electric CAR Harness

    Science.gov (United States)

    Sawatdee, Thiwarat; Chutima, Parames

    2017-06-01

    In an automobile parts design company, the customer satisfaction is one of the most important factors for product design. Therefore, the company employs all means to focus its product design process based on the various requirements of customers resulting in high number of design changes. The objective of this research is to improve the design process of the electric car harness that effects the production scheduling by using Fault Tree Analysis (FTA) and Failure Mode and Effect Analysis (FMEA) as the main tools. FTA is employed for root cause analysis and FMEA is used to ranking a High Risk Priority Number (RPN) which is shows the priority of factors in the electric car harness that have high impact to the design of the electric car harness. After the implementation, the improvements are realized significantly since the number of design change is reduced from 0.26% to 0.08%.

  3. Understanding the 'historical' electricity tariffs

    International Nuclear Information System (INIS)

    2010-01-01

    At the time of the debates about the French 'NOME' (new organization of the electricity market) law, it is interesting to analyse the principles which have led to elaborate the 'historical' electricity tariffs in France, in order to better understand the stakes around their recasting. Today, there exists 2 categories of tariffs: the regulated selling prices and the market offers. The regulated selling prices are different depending on the client (individuals, small professionals, companies)

  4. Positioning of Engineer Ethics from the Standpoint of a Company. And the Ethics Education Towards Practice

    Science.gov (United States)

    Sato, Masaki

    The purpose of a company is contribution to society by operating activities. Therefore, it has a company principle and “Business ethics” conduct codes in each. On the other hand, many engineers with specialties are performing business toward the same purpose at the same company. And it will produce new inconsistency by introducing “Engineer ethics” and “the ethics of each professional” all at once in the situation of that company. Then, the engineer ethics education in company needs to carry out by arranging company conduct codes and Engineer ethics. This paper proposes what the company ethics education should be from exemplifying results by make activities and engineer ethics education of the corporate ethics observance in the Tokyo Electric Power Co., Inc.

  5. A centennial book of Korea electric power corporation

    International Nuclear Information System (INIS)

    1989-12-01

    This book gives description of KEPC with power and life such as lighting, electric power, electric heat and communication, introduction of electric civilization, establishment and manage of Hansung electric company on opening of electric train, regulation of the train, opening of lamp business, construction of Yongsan generator, the Japanese invasion with trouble of supplying electricity, control over power business and development of water power generation, division of Korea and Korea war on damage out of Korea war and rebuild, development and growth on establishment of Korea electric power, establishment of Korea electric power by private and water power development project, stability and development, and challenge for future.

  6. Natural gas and electricity convergence

    International Nuclear Information System (INIS)

    Calger, C.

    1998-01-01

    Convergence between the gas and electricity industries was described as a means for creating an increasingly more efficient energy market where prices and fundamental relationships exist between gas and electricity. Convergence creates new opportunities for producers and consumers. Convergence will likely lead to the disaggregation of the electricity and gas industry into segments such as: (1) power generation and production, (2) transmission wires and pipelines, (3) wholesale merchants, (4) distribution wires and pipelines, and (5) retail marketing, services and administration. The de-integration of integrated utilities has already begun in the U.S. energy markets and retail open access is accelerating. This retail competition will create very demanding customers and the changing risk profile will create new issues for stakeholders. The pace of reform for the telecommunications, airlines, natural gas and electricity industries was graphically illustrated to serve as an example of what to expect. The different paths that the industry might take to deregulation (aggressively embrace reform, or defensively blocking it), and the likely consequences of each reaction were also described. A map indicating where U.S. electric and natural gas utility merger and acquisition activities have taken place between 1994-1997, was included. Another map showing the physical asset positions of the Enron grid, one of the largest independent oil and gas companies in the U.S., with increasing international operations, including an electric power transmission and distribution arm, was also provided as an illustration of a fully integrated energy market company of the future. 9 figs

  7. Climate change and electricity - 2008. European carbon factor. Comparison of CO2 emissions of the main European electric utilities

    International Nuclear Information System (INIS)

    2008-01-01

    This joint PWC/Enerpresse brochure publishes the 2007 results of a study about the greenhouse gas (GHG) emissions of the 22 main European electric power producers. The study shows an increase by 3% of the cumulated emissions of power companies with respect to 2006. These 22 companies represent 59% of the emissions of the power/heat sector in Europe (27 countries). The first 10 companies are responsible of 50% of the GHG emissions of this sector in Europe. Among those, 7 show stable emissions while the others have increased their emissions. (J.S.)

  8. Climate change and electricity - 2006. European carbon factor. Comparison of CO2 emissions of the main European electric utilities

    International Nuclear Information System (INIS)

    2006-01-01

    This joint PWC/Enerpresse brochure publishes the 2005 results of a study about the greenhouse gas (GHG) emissions of the 23 main European electric power producers. The study shows an increase by 1.7% of the cumulated emissions of power companies with respect to 2001. These 23 companies represent 55% of the emissions of the power/heat sector in Europe (25 countries). The first 10 companies are responsible of 45% of the GHG emissions of this sector in Europe. Among those, 7 show stable emissions while 3 have reduced their emissions. (J.S.)

  9. Climate change and electricity - 2003. European carbon factor. Comparison of CO2 emissions of the main European electric utilities

    International Nuclear Information System (INIS)

    2003-01-01

    This joint PWC/Enerpresse brochure publishes the 2002 results of a study about the greenhouse gas (GHG) emissions of the 21 main European electric power producers. The study shows an increase by 0.8% of the cumulated emissions of power companies with respect to 2001. These 21 companies represent 75% of the emissions of the power/heat sector in Europe (25 countries). The first 10 companies are responsible of 60% of the GHG emissions of this sector in Europe. Among those, 7 have increased their emissions while 3 have reduced them. (J.S.)

  10. Current training initiatives at Nuclear Electric plc

    International Nuclear Information System (INIS)

    Fowler, C.D.

    1993-01-01

    Nuclear Electric, one of the three generating companies to emerge from the demise of the U.K.'s Central Electricity Generating Board (CEGB), owns and operates the commercial nuclear power stations in England and Wales. The U.K. government proscribed further construction beyond Sizewell B, the United Kingdom's first pressurized water reactor (PWR) station, pending the outcome of a review of the future of nuclear power to be held in 1994. The major challenges facing Nuclear Electric at its formation in 1990 were therefore to demonstrate that nuclear power is safe, economical, and environmentally acceptable and to complete the PWR station under construction on time and within budget. A significant number of activities were started that were designed to increase output, reduce costs, and ensure that the previous excellent safety standards were maintained. A major activity was to reduce the numbers of staff employed, with a recognition from the outset that this reduction could only be achieved with a significant human resource development program. Future company staff would have to be competent in more areas and more productive. This paper summarizes some of the initiatives currently being pursued throughout the company and the progress toward ensuring that staff with the required competences are available to commission and operate the Sizewell B program in 1994

  11. Managing companies in an open energy market

    International Nuclear Information System (INIS)

    Kaeser, A.

    2006-01-01

    This article presents a comparison of management methods in the electricity supply industry in Germany and Switzerland and of the measures that can be taken in order to meet the new regulatory demands resulting from the opening of the electricity market. The development of legislation on the opening of the electricity market in Switzerland is briefly looked at and the situation to be found in many Swiss companies in the energy sector is looked at. The equivalent situation to be found in Germany is also reviewed as well as various prerequisites for the unbundling of the market, including the so-called 'revenue-cap' method. Quality-assurance in this area is also looked at, as are performance management and other controlling aspects. Also, transport lines and mains-usage are discussed, along with their appropriate regulation. An example is given of a system that allows computer access to the relevant data

  12. The integration of gas and electricity: potential effects on competition in markets

    International Nuclear Information System (INIS)

    Lopez Milla, J.

    2007-01-01

    During the last years, an increasing number of gas and electricity companies have integrated their activities in both sectors. Following this trend, several Mergers and Acquisitions between gas and electricity companies have emerged, and some of them have been cross-borders operations that have given rise to multinational enterprises. This paper analyses the causes of the integration of gas and electricity activities, and examines its implications on regulation and competition policy, showing that these changes in the energy industry raise new challenges and compel to adopt new measures in that field of the economic policy. (Author) 25 refs

  13. 78 FR 77114 - Pacific Gas and Electric Company: Notice of Application Accepted for Filing, Soliciting Comments...

    Science.gov (United States)

    2013-12-20

    ... Company (licensee). e. Name of Projects: Potter Valley Project. f. Location: Eel River and East Fork... Company, Mail Code: N11C P.O. Box 770000 San Francisco, CA 94177. Phone (415) 973-3076. i. FERC Contact...

  14. Environmental performance assessment of a company of aluminum surface treatment

    Directory of Open Access Journals (Sweden)

    Susan Catieri Ramalho

    2013-08-01

    Full Text Available The purpose of this article was to evaluate the environmental performance of a medium-sized company that provides services for surface treatment of aluminum. The treatment is known as anodizing. The research method was qualitative numerical modeling. The environmental performance of the company was organized into five constructs: atmosphere, wastewater, energy and natural resources, solid waste, and legislation and management. Nineteen indicators were chosen to explain the five constructs. Ten employees of the company prioritized the constructs and evaluated the situation of the indicators by means of a scale of assessment. By means of a mathematical model, the general performance of the environmental operation was calculated at 74.5% of the maximum possible. The indicators that most contributed to the performance not to reach 100% were consumption of electricity and water consumption. The construct of worse performance was natural and energy resources. These are the priorities for future environmental improvement actions that the company may promote.

  15. Testing of the 3M Company Composite Conductor

    Energy Technology Data Exchange (ETDEWEB)

    Stovall, John P [ORNL; Rizy, D Tom [ORNL; Kisner, Roger A [ORNL

    2010-10-01

    The 3M Company has developed a high-temperature low-sag conductor referred to as Aluminum-Conductor Composite-Reinforced or ACCR. The conductor uses an aluminum metal matrix material to replace the steel in conventional conductors. The objective of this work is to accelerate the commercial acceptance by electric utilities of this new conductor design by testing four representative conductor classes in controlled conditions. A unique facility called the Powerline Conductor Accelerated Testing (PCAT) Facility was built at ORNL for testing overhead conductors. The PCAT has been uniquely designed for testing overhead bare transmission line conductors at high currents and temperatures after they have been installed and tensioned to the manufacturer's specifications. The ability to operate a transmission line conductor in this manner does not exist elsewhere in the United States. Four classes of ACCR cable designed by the 3M Company have been successfully test at ORNL small, medium, large and small/compact. Based on these and other manufacturer tests, the 3M Company has successfully introduced the ACCR into the commercial market and has completed over twenty installations for utility companies.

  16. Consequences of electricity deregulation on nuclear safety

    International Nuclear Information System (INIS)

    Podjavorsek, M.

    2007-01-01

    The evolution of deregulation of electricity market started a couple of years ago and has not been finished yet. Deregulation causes increased pressure to reduce the costs of electricity generation. This presents a new challenge to regulatory bodies. They have to assess the impact of these changes on the safety of nuclear power plants. Accordingly, it is important to identify the risks to the nuclear power industry resulting from the deregulation. Today's trend is that the number of electricity generating power companies will be reduced in Europe and also in Slovenia due to tough competition in the electricity market. The electricity price has decreased after the introduction of the deregulated market in most countries. This has been also the main reason for less investment to new generating capacities since the price has been lower than the generation costs. Investment problems are also present for the existing units, because of danger of inappropriate maintenance and reduction of the number of staff and their qualifications below the desired level that leads to loss of institutional memory. It is expected that only the biggest companies can stand the consequences of competition in electricity prices and consequential pressure to reduce the cost. In order to review the impact of deregulation of the electricity market some relevant points are discussed in this paper such as the need to cut costs of companies by reducing the number of their activities and increasing the efficiency in the remaining activities and /or outsourcing of activities, power station operating regime, safety culture, grid reliability, reliability and safety of operation, increased number of transients, ageing of components, outage duration, extended cycle and response of nuclear regulators. From a regulatory point of view the impact of deregulation on nuclear safety is an important issue. This paper also discusses analyses and evaluations of this impact and proposes some measures how to

  17. 75 FR 78979 - Application to Export Electric Energy; Twin Rivers Paper Company Inc.

    Science.gov (United States)

    2010-12-17

    ... DEPARTMENT OF ENERGY [OE Docket No. EA-366] Application to Export Electric Energy; Twin Rivers... electric energy from the United States to Canada pursuant to section 202(e) of the Federal Power Act. DATES... received an application from Twin Rivers for authority to transmit electric energy from the United States...

  18. Convergence of the gas and electricity market - Implications for the traditional players

    International Nuclear Information System (INIS)

    Waffel, H. Dieter

    1999-01-01

    This presentation begins with an overview of PreussenElektra, a company that generates electricity from a variety of energy sources, including gas. It then describes developments in the European electricity market and finds striking similarities between that market and the electricity market of the USA as of 1992. Then issues concerning convergence of gas and electricity are considered. Experience from the USA shows that experience gained during gas deregulation could be used in electricity deregulation. Many natural synergies exist between the electric and gas markets, which could speed convergence. One of the first signals of convergence will be the formation of strategic alliances between gas and electricity companies. There are many open questions to consider as deregulation is implemented and convergence occurs. Convergence in Europe promises to be a near-term growth opportunity for advocates and consultants. Market dynamics promise that there will be winners and losers. Incumbency is an advantage, not an assurance of success

  19. Convergence of the gas and electricity market - Implications for the traditional players

    Energy Technology Data Exchange (ETDEWEB)

    Waffel, H. Dieter

    1999-07-01

    This presentation begins with an overview of PreussenElektra, a company that generates electricity from a variety of energy sources, including gas. It then describes developments in the European electricity market and finds striking similarities between that market and the electricity market of the USA as of 1992. Then issues concerning convergence of gas and electricity are considered. Experience from the USA shows that experience gained during gas deregulation could be used in electricity deregulation. Many natural synergies exist between the electric and gas markets, which could speed convergence. One of the first signals of convergence will be the formation of strategic alliances between gas and electricity companies. There are many open questions to consider as deregulation is implemented and convergence occurs. Convergence in Europe promises to be a near-term growth opportunity for advocates and consultants. Market dynamics promise that there will be winners and losers. Incumbency is an advantage, not an assurance of success.

  20. Convergence of the gas and electricity markets - Implications for the traditional players

    Energy Technology Data Exchange (ETDEWEB)

    Waffel, H. Dieter

    1999-07-01

    This presentation begins with an overview of PreussenElektra, a company that generates electricity from a variety of energy sources, including gas. It then describes developments in the European electricity market and finds striking similarities between that market and the electricity market of the USA as of 1992. Then issues concerning convergence of gas and electricity are considered. Experience from the USA shows that experience gained during gas deregulation could be used in electricity deregulation. Many natural synergies exist between the electric and gas markets, which could speed convergence. One of the first signals of convergence will be the formation of strategic alliances between gas and electricity companies. There are many open questions to consider as deregulation is implemented and convergence occurs. Convergence in Europe promises to be a near-term growth opportunity for advocates and consultants. Market dynamics promise that there will be winners and losers. Incumbency is an advantage, not an assurance of success.

  1. Utilization of Indonesia's Hot Spring Sources for Electricity using Kalina Cycle and Organic Rankine Cycle

    Science.gov (United States)

    Prabumukti, Grano; Purwanto; Widodo, Wahyu

    2018-02-01

    Indonesia posses 40% of the world's geothermal energy sources. The existence of hydrothermal sources is usually characterized by their surface manifestations such as hot springs, geysers and fumarole. Hot spring has a potential to be used as a heat source to generate electricity especially in a rural and isolated area. Hot springs can be converted into electricity by binary thermodynamic cycles such as Kalina cycle and ORC. The aim of this study is to obtain the best performances of cycle configuration and the potential power capacity. Simulation is conducted using UNISIM software with working fluid and its operating condition as the decision variables. The simulation result shows that R1234yf and propene with simple ORC as desired working fluid and cycle configuration. It reaches a maximum thermal efficiency up to 9.6% with a specific turbine inlet pressure. Higher temperature heat source will result a higher thermal efficiency‥ Cycle thermal efficiency varies from 4.7% to 9.6% depends on source of hot spring temperature. Power capacity that can be generated using Indonesia's hot spring is ranged from 2 kWe to 61.2 kWe. The highest capacity located in Kawah Sirung and the least located in Kaendi.

  2. GEYSER/TONUS: a coupled multi-D lumped parameter code for reactor thermal hydraulics analysis in case of severe accidents

    Energy Technology Data Exchange (ETDEWEB)

    Petit, M.; Durin, M.; Gauvain, J.

    1995-12-31

    The safety requirements for future light water reactors include accounting for severe accidents in the design process. The design must now include mitigation features to limit pressure and temperature inside the building. Hydrogen concentration is also a major issue for severe accidents. Modelling the thermal hydraulics inside the containment requires the description of complex phenomena such as condensation, stratification, transport of gases and aerosols, heat transfers. The effect of mitigation systems will increase the heterogeneities in the building, and most of those phenomena can be coupled. The GEYSER/TONUS multi-dimensional computer code is under development at CEA Saclay to model this complex situation. It allow the coupling of parts of the containment described in a lumped parameter manner, together with meshed parts. Emphasis is put on the numerical methods used to solve the transient problem, and physical models of classical lumped parameters codes will be adapted for the spatially described zones. The code is developed in the environment of the CASTEM 2000/TRIO EF system which allows to construct sophisticated applications based upon it. (J.S.). 22 refs., 1 fig.

  3. GEYSER/TONUS: a coupled multi-D lumped parameter code for reactor thermal hydraulics analysis in case of severe accidents

    International Nuclear Information System (INIS)

    Petit, M.; Durin, M.; Gauvain, J.

    1995-01-01

    The safety requirements for future light water reactors include accounting for severe accidents in the design process. The design must now include mitigation features to limit pressure and temperature inside the building. Hydrogen concentration is also a major issue for severe accidents. Modelling the thermal hydraulics inside the containment requires the description of complex phenomena such as condensation, stratification, transport of gases and aerosols, heat transfers. The effect of mitigation systems will increase the heterogeneities in the building, and most of those phenomena can be coupled. The GEYSER/TONUS multi-dimensional computer code is under development at CEA Saclay to model this complex situation. It allow the coupling of parts of the containment described in a lumped parameter manner, together with meshed parts. Emphasis is put on the numerical methods used to solve the transient problem, and physical models of classical lumped parameters codes will be adapted for the spatially described zones. The code is developed in the environment of the CASTEM 2000/TRIO EF system which allows to construct sophisticated applications based upon it. (J.S.). 22 refs., 1 fig

  4. Tesla inventor of the electrical age

    CERN Document Server

    Carlson, W Bernard

    2013-01-01

    Nikola Tesla was a major contributor to the electrical revolution that transformed daily life at the turn of the twentieth century. His inventions, patents, and theoretical work formed the basis of modern AC electricity, and contributed to the development of radio and television. Like his competitor Thomas Edison, Tesla was one of America's first celebrity scientists, enjoying the company of New York high society and dazzling the likes of Mark Twain with his electrical demonstrations. An astute self-promoter and gifted showman, he cultivated a public image of the eccentric genius. Even at t

  5. Reforming the Russian electricity market

    International Nuclear Information System (INIS)

    Valladares, Mayra Rodriguez

    1999-08-01

    Contains Executive Summary and Chapters on: Overview; Russian energy markets; Evolution of the power sector; The electricity market; Regulation and proposed reforms; Politics in the power sector; Economics of the power sector; Regional differences; Foreign involvement; Valuation and company management; Conclusions. (Author)

  6. Green electricity: Tracking systems for environmental disclosure

    Energy Technology Data Exchange (ETDEWEB)

    Biewald, B.E.; Ramey, J.A. [Synapse Energy Economics, Inc., Cambridge, MA (United States)

    1997-12-31

    For the first time, electricity consumers in the US are beginning to choose their generation providers. One of the opportunities created by the introduction of retail choice in electricity is the chance for customers to influence the mix of generating resources through their purchasing decisions. Some environmentally aware consumers will want {open_quotes}clean,{close_quotes} {open_quotes}green,{close_quotes} or renewable power. While some suppliers will attempt to differentiate themselves according to their environmental performance, such claims for green electricity can be particularly difficult to verify given the complexity of the interconnected electric system. Because electricity is delivered over an integrated transmission grid and kilowatt-hours at the point of retail sale are indistinguishable from each other; disclosure requires tracking protocols to attribute generation at power plants to sales at the customers` meters. Fortunately, it is possible to implement a workable disclosure system. Some states have already included disclosure requirements in their electric industry restructuring orders and legislation. In this paper, a set of design criteria for an environmental disclosure system are presented along with two methods for disclosure: the company approach and the product approach. In addition, the authors discuss of power pools, data availability issues, and propose a company-based disclosure system using a {open_quotes}wholesale sales first{close_quotes} approach to transaction accounting.

  7. Security-constrained self-scheduling of generation companies in day-ahead electricity markets considering financial risk

    International Nuclear Information System (INIS)

    Amjady, Nima; Vahidinasab, Vahid

    2013-01-01

    Highlights: ► A security-constrained self-scheduling is presented. ► The proposed framework takes into account the uncertainty of the predicted market prices. ► We model the risk and profit tradeoff of a GENCO based on an efficient multi-objective model. ► Unit commitment and inter-temporal constraints of generators are considered in an MIP model. ► Simulation results are presented on the IEEE 30-bus and IEEE 118-bus test systems. - Abstract: In this paper, a new security-constrained self-scheduling framework incorporating the transmission flow limits in both steady state conditions and post-contingent states is presented to produce efficient bidding strategy for generation companies (GENCOs) in day-ahead electricity markets. Moreover, the proposed framework takes into account the uncertainty of the predicted market prices and models the risk and profit tradeoff of a GENCO based on an efficient multi-objective model. Furthermore, unit commitment and inter-temporal constraints of generators are considered in the suggested model converting it to a mixed-integer programming (MIP) optimization problem. Sensitivity of the proposed framework with respect to both the level of the market prices and adopted risk level is also evaluated in the paper. Simulation results are presented on the IEEE 30-bus and IEEE 118-bus test systems illustrating the performance of the proposed self-scheduling model.

  8. Zap... Alberta is jolted by electric deregulation

    International Nuclear Information System (INIS)

    Howe, M.E.

    2001-01-01

    Of all Canadian provinces, Alberta has travelled the furthest along the electric deregulation road. On January 1, 2001, full retail competition came into effect. Wholesale electricity prices are set by the province through an auction process. The bids from purchasers are made through the Power Pool of Alberta against supply offers. Power prices increased from being amongst the lowest in the world to being amongst the highest in North America as a result of deregulation. Changes to the Electric Utilities Act were made recently by the Alberta government to try to mitigate the factors affecting power price increases. RBC Dominion Securities is of the opinion that the changes will not significantly impact the Alberta Pool Price. It is expected that the trend for power price increases to continue, despite some relief from relatively low-cost electricity being felt by other Canadian provinces as a result of the energy crisis in North America. Based on the Electric Competition Unfolds in Alberta report dated June 2, 2001 prepared by RBC Dominion Securities, this document examines the factors at play in electric price increases, assess the sustainability of current power prices in Alberta, and identify Canadian companies believed to be best positioned in the pipeline and gas and electric sectors to benefit from the high power prices in Alberta. Those companies were ATCO, Canadian Utilities, Westcoast Energy and TransCanada PipeLines, and TransAlta. 5 tabs., 5 figs

  9. Electric utility deregulation - A nuclear opportunity

    International Nuclear Information System (INIS)

    DeMella, J.R.

    2002-01-01

    The implications of electric deregulation are and will continue to be pervasive and significant. Not only will the fundamental monopoly regulatory concepts of managing electric utilities change but deregulation will have a profound and dramatic impact on the way electric generating plants are managed and operated. In the past, under the various approaches to financial regulation, the economic benefits normally attributed to competition or that would have otherwise been derived from competitive or open market forces, were assumed to be embodied in and inherent to the various processes, methods and principles of financial oversight of utility companies by regional, state and municipal regulatory authorities. Traditionally, under the various forms of regulated monopolies, a utility company, in exchange for an exclusive franchise to produce and sell electricity in a particular region, was obligated to provide an adequate supply to all consumers wanting it, at a price that was 'just and reasonable'. The determination of adequate supply and reasonable price was a matter of interpretation by utility companies and their regulators. In essence, the ultimate economic benefits, normally attributed to price equilibrium, in balance with supply, demand and other market forces, were expected to be achieved through a complex, political process of financial regulatory oversight, in which utility companies were usually reimbursed for all annual expenses or their 'cost of service' and additionally allowed to earn a 'reasonable' rate of return on plant investments. The result was often escalating electric prices, over supplies of electric capacity, by justifying unnecessarily high reserve margins based on long planning horizons (typically 20 years or greater) with extrapolated demand requirements that were generally in excess of what actually occurred over time. Although the regulatory process varied from country or country and region-to-region, the fundamental principles, which

  10. Trading green electricity

    International Nuclear Information System (INIS)

    Davies, M.

    1997-01-01

    A study has been carried out into the feasibility of developing an electricity trading mechanism which would allow consumers to purchase electricity which has been derived from renewable energy resources. This study was part funded by the European Commission (ALTENER), the Department of Trade and Industry and a number of private sector companies. The trading mechanism is known as the Green Pool. As a result of the findings of this study discussions are being held with potential generators and suppliers to establish a Green Pool plc. The aim is to encourage the development of new renewable energy projects outside the NFFO and SRO schemes. The Green Pool plc will be owned by the generators and its main objective will be to market the electricity produced by its members. (Author)

  11. The Relationship Between Electricity Price and Wind Power Generation in Danish Electricity Markets

    DEFF Research Database (Denmark)

    Hu, Weihao; Chen, Zhe; Bak-Jensen, Birgitte

    2010-01-01

    of competitive electricity markets in some ways, is chosen as the studied power system. The relationship between the electricity price (both the spot price and the regulation price) and the wind power generation in an electricity market is investigated in this paper. The spot price, the down regulation price...... and the up regulation price generally decreases when the wind power penetration in the power system increases. The statistical characteristics of the spot price for different wind power penetration are analyzed. The findings of this paper may be useful for wind power generation companies to make the optimal...... bidding strategy and may be also useful for the optimal operation of modern power systems with high wind power penetrations....

  12. A system perspective to the deployment of flexibility through aggregator companies

    NARCIS (Netherlands)

    Lampropoulos, I.; van den Broek, M.A.; van Sark, W.G.J.H.M.; van der Hoofd, Erik; Hommes, Klaas

    2016-01-01

    This work focuses on the facilitation of aggregator companies for the provision of flexibility services to the electricity system by using large numbers of dispersed and distributed resources of small capacities. This initiative by TenneT TSO and Utrecht University is about identifying potential

  13. Modular Electric Vehicle Program (MEVP). Final technical report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-03-01

    The Modular Electric Vehicle Program (MEVP) was an EV propulsion system development program in which the technical effort was contracted by DOE to Ford Motor Company. The General Electric Company was a major subcontractor to Ford for the development of the electric subsystem. Sundstrand Power Systems was also a subcontractor to Ford, providing a modified gas turbine engine APU for emissions and performance testing as well as a preliminary design and producibility study for a Gas Turbine-APU for potential use in hybrid/electric vehicles. The four-year research and development effort was cost-shared between Ford, General Electric, Sundstrand Power Systems and DOE. The contract was awarded in response to Ford`s unsolicited proposal. The program objective was to bring electric vehicle propulsion system technology closer to commercialization by developing subsystem components which can be produced from a common design and accommodate a wide range of vehicles; i.e., modularize the components. This concept would enable industry to introduce electric vehicles into the marketplace sooner than would be accomplished via traditional designs in that the economies of mass production could be realized across a spectrum of product offerings. This would eliminate the need to dedicate the design and capital investment to a limited volume product offering which would increase consumer cost and/or lengthen the time required to realize a return on the investment.

  14. Electric power transmission system: A new expansion scheme

    International Nuclear Information System (INIS)

    Unidad de Planeacion Minero Energetica, UPME

    2000-01-01

    With the purpose of responding to the interconnection requirements among the main cities of the country, a company of public character was created, in charge of the planning and of the development of the national interconnected system (NIS), in such form that their work optimized the use of the available energy resources for the electricity supply and it improved the accounting levels and quality of the service. Starting from 1967, interconnection electric Corp., ISA, a very important task began in the development of methodologies and strategies of expansion of the INS that it allowed, in very short term, to connect the areas of Bogota the Atlantic Cost, Antioquia and the Cauca Valley and to develop important generation projects for the supply of electric power of the country. Then, the electric sector was reformed through the laws 142 and 143 of 1994, in search of the specialization of the business and in that sense, ISA is divided in two companies: ISAGEN that the activities degeneration and electric power commercialization, and ISA, company electric power transport, that it takes charge of the interconnection of the national system assumes. In connection with the execution of the transmission works and in the face of the possibility of lingering courts of energy, the law establishes that ISA will carry out the works that are needed and that the particular initiative doesn't develop. For that same time, it is considered that the planning should be carried out in an integral way, taking into account the requirements of the population's energy and its possibilities of supply and through programs and actions of appropriate use of the available energy resources. The UPME (Unit of Planning Miner Energetic) was created for assumes this work, so with their analyses they already offer signs to the state the investors, about the population's necessities and of the business opportunities, respectively

  15. Reforming European electricity industries: to each, his own ''single market''

    International Nuclear Information System (INIS)

    Glachant, J.M.

    2000-01-01

    National transpositions of the European directive on domestic electricity markets have maintained a degree of diversity; and this also characterizes the other conditions for accessing national electricity markets (physical, commercial, industrial and capital access). As a look at the prices of electricity shows, these national markets do not operate in a single way Europe-wide. Furthermore, electricity companies - key actors in this competition - differ widely from each other in size, electrical potential, investment portfolios and strategies for growth. (authors)

  16. Draft environmental impact statement for construction and operation of the proposed Bangor Hydro-Electric Company`s second 345-kV transmission tie line to New Brunswick

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-10-01

    This Draft Environmental Impact Statement (DEIS) was prepared by the US Department of Energy (US DOE). The proposed action is the issuance of Presidential Permit PP-89 by DOE to Bangor Hydro-Electric Company to construct and operate a new international transmission line interconnection to New Brunswick, Canada that would consist of an 83.8 mile (US portion), 345-kilovolt (kV) alternating current transmission line from the US-Canadian border at Baileyville, Maine to an existing substation at Orrington, Maine. The principal environmental impacts of the construction and operation of the transmission line would be incremental in nature and would include the conversion of forested uplands (mostly commercial timberlands) and wetlands to right-of-way (small trees, shrubs, and herbaceous vegetation). The proposed line would also result in localized minor to moderate visual impacts and would contribute a minor incremental increase in the exposure of some individuals to electromagnetic fields. This DEIS documents the purpose and need for the proposed action, describes the proposed action and alternatives considered and provides a comparison of the proposed and alternatives routes, and provides detailed information on analyses of the environmental consequences of the proposed action and alternatives, as well as mitigative measures to minimize impacts.

  17. Concepts of investment risks and strategies in electricity generation

    International Nuclear Information System (INIS)

    De Joode, J.; Boots, M.G.

    2005-06-01

    This report deals with the specific investment risks in electricity generation and discusses the problems associated with energy investments in general and focus on the additional or changing risks resulting from electricity market liberalisation. The focus is on (1) risks under the control of the electricity company, and on (2) market risks, such as the risk of price changes. Ultimately, some of the approaches and strategies that enable electricity producers to counter or mitigate these risks are discussed

  18. Electricity deregulation - impact on gas users and markets

    International Nuclear Information System (INIS)

    Koeppel, H.

    1995-01-01

    Various scenarios for the natural gas market as a function a electricity deregulation were predicted. One scenario was the formation of an integrated market where sellers would offer a broad spectrum of energy products. This diversification would expand into the retail sector across North America. The second effect of electricity deregulation was energy cost reduction. The consumers have already been experiencing this benefit of deregulation. Cost reduction has also stimulated competition among energy suppliers, and improved suppliers' response to consumers'demands. The eventual shake-out of energy suppliers was predicted. Smaller companies that could not survive the competition would give up the market to larger companies that understood and met the customers' needs. It was concluded that deregulation of the electricity industry would have an enormous impact on the natural gas industry and that there would be opportunities for gain among buyers and sellers

  19. The structure of the electricity market in the Federal Republic of Germany

    International Nuclear Information System (INIS)

    Schiffer, H.W.

    1989-01-01

    The power industry in the Federal Republic of Germany can be subdivided into the three subareas of public electricity supply, industrial power generation, and electricity supply to the Federal Railways. The most important sector, public electricity supply, is organized in private companies. Its special characteristics are its decentralized, pluralistic structure. The public electricity supply sector is made up of approximately 1000 firms, half of which only have a market share of approx. 1%, however. 89% of the total deliveries of useful electricity come from the 91 largest companies; the 26 biggest firms are responsible for 64% of the total deliveries of useful electricity. In terms of electricity generation, the two largest firms contribute 43%, the 25 largest, 72%, and the 116 largest, 99%. The firms in the public electricity supply sector contributed well over 80% of the total electricity production in 1988 of approx. 425 billion kWh. Since its origins late in the past century, the public power industry has been arranged in a comprehensive network of agreements restricting competition. At the distribution level, for instance, the supply regions of the electricity utilities are divided up by agreements excluding competition, so-called demarcation agreements. (orig.) [de

  20. Electricity sector reform in Greece

    International Nuclear Information System (INIS)

    Iliadou, Ekaterini N.

    2009-01-01

    This paper provides an outlook of the electricity market reform in Greece which started in 2001 and is still developing slowly. This is related to the persisting dominance of the incumbent company and the specificities of the electricity sector of Greece which is heavily dependent on indigenous lignite firing generation, while being located in the periphery of the EU internal electricity and gas markets. Competition through enhancing electricity trade in the region is limited to date, as the establishment of an internal market in South East Europe also progresses slowly. Development of competition through gas-firing generation by new entrants has been the priority adopted by State and Regulator's policies. However, the gas supply market in Greece and in the region still lags behind. (author)

  1. Integrating gas and electric markets and regulation

    International Nuclear Information System (INIS)

    Whitmore, C.S.

    1998-01-01

    The issues determining what energy companies must do to compete in an increasingly competitive energy market and what regulators must do to ensure fairness in competition were discussed. The similarities of gas and electric markets, and the factors driving their integration were highlighted. The importance of communications and customer service in the energy market and the nature of market power in the gas and electric industries was described. Three reasons were given why gas/electric mergers will be beneficial: (1) operating efficiency, (2) applying gas experience to electric markets, and (3) opportunity to exercise market power. Potential regulatory problems were also reviewed

  2. Portfolio optimization in electricity markets

    International Nuclear Information System (INIS)

    Liu, Min; Wu, Felix F.

    2007-01-01

    In a competitive electricity market, Generation companies (Gencos) face price risk and delivery risk that affect their profitability. Risk management is an important and essential part in the Genco's decision making. In this paper, risk management through diversification is considered. The problem of energy allocation between spot markets and bilateral contracts is formulated as a general portfolio optimization problem with a risk-free asset and n risky assets. Historical data of the PJM electricity market are used to demonstrate the approach. (author)

  3. Radiocarbon dating of silica sinter deposits in shallow drill cores from the Upper Geyser Basin, Yellowstone National Park

    Science.gov (United States)

    Lowenstern, Jacob B.; Hurwitz, Shaul; McGeehin, John P.

    2016-01-01

    To explore the timing of hydrothermal activity at the Upper Geyser Basin (UGB) in Yellowstone National Park, we obtained seven new accelerator mass spectrometry (AMS) radiocarbon 14C ages of carbonaceous material trapped within siliceous sinter. Five samples came from depths of 15-152 cm within the Y-1 well, and two samples were from well Y-7 (depths of 24 cm and 122 cm). These two wells, at Black Sand and Biscuit Basins, respectively, were drilled in 1967 as part of a scientific drilling program by the U.S. Geological Survey (White et al., 1975). Even with samples as small as 15 g, we obtained sufficient carbonaceous material (a mixture of thermophilic mats, pollen, and charcoal) for the 14C analyses. Apparent time of deposition ranged from 3775 ± 25 and 2910 ± 30 14C years BP at the top of the cores to about 8000 years BP at the bottom. The dates are consistent with variable rates of sinter formation at individual sites within the UGB over the Holocene. On a basin-wide scale, though, these and other existing 14C dates hint that hydrothermal activity at the UGB may have been continuous throughout the Holocene.

  4. 75 FR 42432 - Northern Natural Gas Company, Southern Natural Gas Company, Florida Gas Transmission Company, LLC...

    Science.gov (United States)

    2010-07-21

    ... Natural Gas Company, Southern Natural Gas Company, Florida Gas Transmission Company, LLC, Transcontinental... abandonment of facilities by Northern Natural Gas Company, Southern Natural Gas Company, Florida Gas... resources, fisheries, and wetlands; Cultural resources; Vegetation and wildlife; Endangered and threatened...

  5. Ontario electricity industry restructuring

    International Nuclear Information System (INIS)

    1999-01-01

    The objective of Ontario's electricity industry restructuring was described as an effort to enhance Ontario's competitiveness. It is believed that restructuring can be accomplished without an increase in electricity rates. In a series of charts, the report provides the timeline of restructuring from the time of the Macdonald report in 1995 to the beginning of open competition in Ontario electricity markets. It oulines the principles underlying the financial restructuring and the financial results of restructuring, including the size of the stranded debt ($ 7.8 billion). It lists the changes that have occurred since October 1998, explains some key factors in valuing the successor companies and profiles the Ontario Electricity Financial Corporation. Restructuring of the industry is expected to have a neutral to positive impact on Ontario's fiscal position. The residual stranded debt of $7.8 billion will be retired through revenues generated by the electricity sector, without recourse to the Provincial Treasury. 9 figs

  6. Integrated Plant Safety Assessment: Systematic Evaluation Program. Yankee Nuclear Power Station, Yankee Atomic Electric Company, Docket No. 50-29. Final report

    International Nuclear Information System (INIS)

    1983-06-01

    The Systematic Evaluation program was initiated in February 1977 by the US Nuclear Regulatory Commission to review the designs of older operating nuclear reactor plants to confirm and document their safety. The review provides: (1) an assessment of how these plants compare with current licensing safety requirements relating to selected issues, (2) a basis for deciding on how these differences should be resolved in an integrated plant review, and (3) a documented evaluation of plant safety. This report documents the review of Yankee Nuclear Power Station, operated by Yankee Atomic Electric Company. The Yankee plant is one of 10 plants reviewed under Phase II of this program. This report indicates how 137 topics selected for review under Phase I of the program were addressed. Equipment and procedural changes have been identified as a result of the review

  7. Integrated Plant Safety Assessment, Systematic Evaluation Program. Yankee Nuclear Power Station, Yankee Atomic Electric Company, Docket No. 50-29. Draft report

    International Nuclear Information System (INIS)

    1983-02-01

    The Systematic Evaluation Program was initiated in February 1977 by the US Nuclear Regulatory Commission to review the designs of older operating nuclear reactor plants to confirm and document their safety. The review provides (1) an assessment of how these plants compare with current licensing safety requirements relating to selected issues, (2) a basis for deciding on how these differences should be resolved in an integrated plant review, and (3) a documented evaluation of plant safety. This report documents the review of Yankee Nuclear Power Station, operated by Yankee Atomic Electric Company. The Yankee plant is one of 10 plants reviewed under Phase II of this program. This report indicates how 137 topics selected for review under Phase I of the program were addressed. Equipment and procedural changes have been identified as a result of the review

  8. Canvassing the Cyber Security Landscape: Why Energy Companies Need to Pay Attention

    OpenAIRE

    Averill, B.; Luiijf, H.A.M.

    2010-01-01

    Recent news of a “highly sophisticated and targeted” cyber attack on Google, Yahoo, and perhaps on as many as a dozen other companies has once again brought the issue of cyber security to the top of the news. Internet companies, however, are not the only ones vulnerable to such attacks. Over the past decade, a series of events has highlighted the vulnerability of the electric grid and other energy infrastructures to both cyber disruptions (due, e.g., to malware) and from outside attacks using...

  9. Reduction of operations and maintenance costs at geothermal power plants

    Energy Technology Data Exchange (ETDEWEB)

    Bruton, C.J.; Stevens, C.G.; Rard, J.A.; Kasameyer, P.W. [Lawrence Livermore National Lab., CA (United States)

    1997-12-31

    To reduce chemical costs at geothermal power plants, we are investigating: (a) improved chemical processes associated with H{sub 2}S abatement techniques, and (b) the use of cross dispersive infrared spectrometry to monitor accurately, reliably, and continuously H{sub 2}S emissions from cooling towers. The latter is a new type of infrared optical technology developed by LLNL for non-proliferation verification. Initial work is focused at The Geysers in cooperation with Pacific Gas and Electric. Methods for deploying the spectrometer on-site at The Geysers are being developed. Chemical analysis of solutions involved in H{sub 2}S abatement technologies is continuing to isolate the chemical forms of sulfur produced.

  10. Service hall in Number 1 Fukushima Nuclear Power Station, Tokyo Electric Power Company, Inc

    International Nuclear Information System (INIS)

    Tawara, Shigesuke

    1979-01-01

    There are six BWR type nuclear power plants in the Number 1 Fukushima Nuclear Power Station, Tokyo Electric Power Company, Inc. The service hall of the station is located near the entrance of the station. In the center of this service hall, there is the model of a nuclear reactor of full scale. This mock-up shows the core region in the reactor pressure vessel for the number one plant. The diameter and the thickness of the pressure vessel are about 5 m and 16 cm, respectively. The fuel assemblies and control rods are set just like the actual reactor, and the start-up operation of the reactor is shown colorfully and dynamically by pushing a button. When the control rods are pulled out, the boiling of water is demonstrated. The 1/50 scale model of the sixth plant with the power generating capacity of 1100 MWe is set, and this model is linked to the mock-up of reactor written above. The operations of a recirculating loop, a turbine and a condenser are shown by switching on and off lamps. The other exhibitions are shielding concrete wall, ECCS model, and many kinds of panels and models. This service hall is incorporated in the course of study and observation of civics. The good environmental effects to fishes and shells are explained in this service hall. Official buildings and schools are built near the service hall utilizing the tax and grant concerning power generation. This service hall contributes to give much freedom from anxiety to the public by the tour. (Nakai, Y.)

  11. An energy service company's perspective on demand-side management

    International Nuclear Information System (INIS)

    Bullock, C.G.

    1993-01-01

    In 1985, Massachusetts Electric Company held a bid for demand reduction to be supplied by energy service companies (ESCOs). It was one of the first demand-side management (DSM) bidding programs held in the United States. Since then, several DSM auctions have been held. Many people expected DSM bidding to be a key component in integrated resource planning. Many observed similarities with supply side bidding, and expected DSM bidding to grow according. Today, more than $2 billion annually is being spent by utilities on DSM programs. Less than $100 million is spent with ESCOs. This chapter explores some of the reasons for the current situation and suggests some alternatives, which could benefit all of the players

  12. 75 FR 1622 - Decision To Evaluate a Petition To Designate a Class of Employees for the General Electric...

    Science.gov (United States)

    2010-01-12

    ... Employees for the General Electric Company, Evendale, OH, To Be Included in the Special Exposure Cohort... evaluate a petition to designate a class of employees for the General Electric Company, Evendale, Ohio, to... Compensation Program Act of 2000. The initial proposed definition for the class being evaluated, subject to...

  13. 75 FR 13524 - Northern Natural Gas Company, Southern Natural Gas Company, Florida Gas Transmission Company, LLC...

    Science.gov (United States)

    2010-03-22

    ... Natural Gas Company, Southern Natural Gas Company, Florida Gas Transmission Company, LLC, Transcontinental... notice that on March 5, 2010, Northern Natural Gas Company (Northern Natural), 1111 South 103rd Street, Omaha, Nebraska 68124- 1000, filed on behalf of itself and other owners, Southern Natural Gas Company...

  14. Law no. 2004-803 from August 9, 2004 relative to electricity and gas public utilities and to the power and gas companies; Loi no. 2004-803 du 9 aout 2004 relative au service public de l'electricite et du gaz et aux entreprises electriques et gazieres

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-09-01

    The aim of this law is to allow the administrations to avoid to use their eligibility right with the opening of the electricity and gas markets to competition. It changes the juridical status of the two public utilities Electricite de France (EdF) and Gaz de France (GdF) into two anonymous companies and creates two additional companies for the management of the power and gas networks. It ensures also the transposition of the European directives from June 26, 2003 (2003/54/CE and 2003/55/CE). It contains some proper dispositions and modifies various existing French laws, in particular the law no. 46-628 from April 8, 1946 about the electricity and gas nationalization and the law no. 2000-108 from February 10, 2000 relative to the modernization and development of the electric public utility. (J.S.)

  15. Electric vehicles: Technology assessment and commercialization

    International Nuclear Information System (INIS)

    Zabot, S.

    1991-01-01

    This article traces the history of commercialization efforts relative to electric vehicles, assesses the state-of-the-art of electric vehicle technology and identifies the industrial firms that are investing heavily in this field. The main design problems affecting the commercialization of these vehicles (e.g., battery weight, autonomy, operating safety and toxicity) are pointed out. Comparisons of commercialization prospects are made with those for hydrogen fuelled vehicles. With regard to investments in research programs, it is argued that, in addition to car manufacturers and oil companies, the usual active participants in the transport sector, new participants are needed to give added support to the development of electric vehicles, namely, electric utilities and battery manufacturers

  16. Severity of electrical accidents in the construction industry in Spain.

    Science.gov (United States)

    Suárez-Cebador, Manuel; Rubio-Romero, Juan Carlos; López-Arquillos, Antonio

    2014-02-01

    This paper analyzes the severity of workplace accidents involving electricity in the Spanish construction sector comprising 2,776 accidents from 2003 to 2008. The investigation considered the impact of 13 variables, classified into 5 categories: Personal, Business, Temporal, Material, and Spatial. The findings showed that electrical accidents are almost five times more likely to have serious consequences than the average accident in the sector and it also showed how the variables of age, occupation, company size, length of service, preventive measures, time of day, days of absence, physical activity, material agent, type of injury, body part injured, accident location, and type of location are related to the severity of the electrical accidents under consideration. The present situation makes it clear that greater effort needs to be made in training, monitoring, and signage to guarantee a safe working environment in relation to electrical hazards. This research enables safety technicians, companies, and government officials to identify priorities and to design training strategies to minimize the serious consequences of electrical accidents for construction workers. Copyright © 2013 Elsevier Ltd and National Safety Council. All rights reserved.

  17. The restructuring of the Ontario electricity market

    International Nuclear Information System (INIS)

    Doucet, J.A.

    1999-01-01

    A summary of the current status of the deregulation of the electricity market in Ontario was presented. To follow global deregulation trends, the Ontario Government has embarked on a considerable restructuring of the Ontario electricity market. The monopoly position of Ontario Hydro has been removed by restructuring the provincial utility into two separate companies, GENCO and SERVCO, which will be responsible for the generation and transmission and distribution of electricity, respectively. Other mechanisms put in place to favour a free and competitive market for electricity in the province, such as the arrival on the market of other electricity producers, and the establishment of the independent market operator, are also discussed. 2 tabs

  18. Determining market boundaries in the electricity sector

    International Nuclear Information System (INIS)

    Godde, Anne

    2013-01-01

    The purpose of the present study was to develop a method of determining market boundaries in preparation of identifying all the competitive forces which a company in the electricity sector must address and deciding on this basis whether it has a dominant position in the market. The study focused in particular on current developments in the German electricity sector, this being the only way to permit a demarcation that accurately reflects the true economic situation. First the question was addressed whether a determination of market boundaries is at all necessary for performing a competitive analysis and in what specific constellations they could play a role. Giving due consideration to the special features of the electricity sector the most preferable market demarcation methods were applied to individual areas of the electricity sector that are of competitive relevance. Efforts were directed at arriving at market boundaries most conducive to the goal of identifying those competitive forces which a company in the electricity sector must address. For this purpose a critical assessment was undertaken of established market demarcation practices in Europe and Germany in order to determine whether ''classical'' market demarcation methods could be applied or whether modifications were needed on account of special features of market structure. The author also describes and discusses alternatives to the established market demarcation methods. She also elucidates methods of determining the boundaries of markets that have emerged as a result of recent developments in the electricity sector, for example through the growth of electricity production from renewable resources, or which are still in the process of formation.

  19. Transforming Ontario's Power Generation Company

    International Nuclear Information System (INIS)

    Manley, J.; Epp, J.; Godsoe, P.C.

    2004-01-01

    The OPG Review Committee was formed by the Ontario Ministry of Energy to provide recommendations and advice on the future role of Ontario Power Generation Inc. (OPG) in the electricity sector. This report describes the future structure of OPG with reference to the appropriate corporate governance and senior management structure. It also discusses the potential refurbishing of the Pickering A nuclear generating Units 1, 2 and 3. The electricity system in Ontario is becoming increasingly fragile. The province relies heavily on electricity imports and the transmission system is being pushed to near capacity. Three nuclear generating units are out of service. The problems can be attributed to the fact that the electricity sector has been subjected to unpredictable policy changes for more than a decade, and that the largest electricity generator (OPG) has not been well governed. OPG has had frequent senior management change, accountability has been weak, and cost overruns have delayed the return to service of the Pickering nuclear power Unit 4. It was noted that the generating assets owned and operated by OPG are capable of providing more than 70 per cent of Ontario's electricity supply. Decisive action is needed now to avoid a potential supply shortage of about 5,000 to 7,000 megawatts by 2007. In its current state, OPG risks becoming a burden on ratepayers. Forty recommendations were presented, some of which suggest that OPG should become a rate-regulated commercial utility focused on running and maintaining its core generating assets. This would require that the government act as a shareholder, and the company operate like a commercial business. It was also emphasized that the market must be allowed to bring in new players. refs., tabs., figs

  20. Electricity reform abroad and US investment

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-10-01

    This report reviews and analyzes the recent electricity reforms in Argentina, Australia, and the United Kingdom (UK) to illustrate how different models of privatization and reform have worked in practice. This report also analyzes the motivations of the U.S. companies who have invested in the electricity industries in these countries, which have become the largest targets of U.S. foreign investment in electricity. Two calculations of foreign investment are used. One is the foreign direct investment series produced by the U.S. Department of Commerce. The other is based on transactions in electric utilities of the three countries. The electricity reform and privatization experiences reviewed may offer some insight as to how the U.S. electricity industry might develop as a result of recent domestic reform efforts and deregulation at the state and national levels. 126 refs., 23 figs., 27 tabs.