WorldWideScience

Sample records for effects research commission

  1. Evaluation of a 'virtual' approach to commissioning health research.

    Science.gov (United States)

    McCourt, Christine A; Morgan, Philip A; Youll, Penny

    2006-10-18

    The objective of this study was to evaluate the implementation of a 'virtual' (computer-mediated) approach to health research commissioning. This had been introduced experimentally in a DOH programme--the 'Health of Londoners Programme'--in order to assess whether is could enhance the accessibility, transparency and effectiveness of commissioning health research. The study described here was commissioned to evaluate this novel approach, addressing these key questions. A naturalistic-experimental approach was combined with principles of action research. The different commissioning groups within the programme were randomly allocated to either the traditional face-to-face mode or the novel 'virtual' mode. Mainly qualitative data were gathered including observation of all (virtual and face-to-face) commissioning meetings; semi-structured interviews with a purposive sample of participants (n = 32/66); structured questionnaires and interviews with lead researchers of early commissioned projects. All members of the commissioning groups were invited to participate in collaborative enquiry groups which participated actively in the analysis process. The virtual process functioned as intended, reaching timely and relatively transparent decisions that participants had confidence in. Despite the potential for greater access using a virtual approach, few differences were found in practice. Key advantages included physical access, a more flexible and extended time period for discussion, reflection and information gathering and a more transparent decision-making process. Key challenges were the reduction of social cues available in a computer-mediated medium that require novel ways of ensuring appropriate dialogue, feedback and interaction. However, in both modes, the process was influenced by a range of factors and was not technology driven. There is potential for using computer-mediated communication within the research commissioning process. This may enhance access

  2. European commission research activities on iodine

    Energy Technology Data Exchange (ETDEWEB)

    Loggia, E della [European Commission, Brussels (Belgium)

    1996-12-01

    The research on iodine, as on other important fission products which would be released during a severe accident, carried out directly or organized by the European Commission stems from the Euratom Treaty, namely from Chapter III of the treaty which deals with the protection of the health of the population against radiations and from Chapter I which deals with research. In this paper we do not consider the Commission radiological protection programme: we limit ourselves to the presentation of the research carried out on Iodine as part of the most recent source term studies within the framework Programmes as are called the research programme of the European Commission, usually valid for a 4 year periods. The research activities are carried out by the European Commission either directly through the Joint Research Centres (JRC) or indirectly through collaboration with research organizations of Member States. Concerning the iodine research carried out as Direct Action in the Joint Research Centres, are mentioned here the most relevant activities carried out in this field at the JRC of Ispra and Karlsruhe (TUI). As Indirect Action, we present here the results of some studies allocated by the European Commission to experts of research organizations of Member Countries, followed by a short description of the main results achieved by the Reinforced Concerted Action, within the III Framework Programme (1992-1995). At the end of the paper are described the research on iodine being carried out or proposed within the IV Framework Programme (1995-1998). Mention is also done of the Commission participation, relevant in terms of financial and human efforts, to the PHEBUS FP Project. (author) refs.

  3. European commission research activities on iodine

    International Nuclear Information System (INIS)

    Loggia, E. della

    1996-01-01

    The research on iodine, as on other important fission products which would be released during a severe accident, carried out directly or organized by the European Commission stems from the Euratom Treaty, namely from Chapter III of the treaty which deals with the protection of the health of the population against radiations and from Chapter I which deals with research. In this paper we do not consider the Commission radiological protection programme: we limit ourselves to the presentation of the research carried out on Iodine as part of the most recent source term studies within the framework Programmes as are called the research programme of the European Commission, usually valid for a 4 year periods. The research activities are carried out by the European Commission either directly through the Joint Research Centres (JRC) or indirectly through collaboration with research organizations of Member States. Concerning the iodine research carried out as Direct Action in the Joint Research Centres, are mentioned here the most relevant activities carried out in this field at the JRC of Ispra and Karlsruhe (TUI). As Indirect Action, we present here the results of some studies allocated by the European Commission to experts of research organizations of Member Countries, followed by a short description of the main results achieved by the Reinforced Concerted Action, within the III Framework Programme (1992-1995). At the end of the paper are described the research on iodine being carried out or proposed within the IV Framework Programme (1995-1998). Mention is also done of the Commission participation, relevant in terms of financial and human efforts, to the PHEBUS FP Project. (author) refs

  4. Evaluation of a 'virtual' approach to commissioning health research

    Directory of Open Access Journals (Sweden)

    Morgan Philip A

    2006-10-01

    Full Text Available Abstract Background The objective of this study was to evaluate the implementation of a 'virtual' (computer-mediated approach to health research commissioning. This had been introduced experimentally in a DOH programme – the 'Health of Londoners Programme' – in order to assess whether is could enhance the accessibility, transparency and effectiveness of commissioning health research. The study described here was commissioned to evaluate this novel approach, addressing these key questions. Methods A naturalistic-experimental approach was combined with principles of action research. The different commissioning groups within the programme were randomly allocated to either the traditional face-to-face mode or the novel 'virtual' mode. Mainly qualitative data were gathered including observation of all (virtual and face-to-face commissioning meetings; semi-structured interviews with a purposive sample of participants (n = 32/66; structured questionnaires and interviews with lead researchers of early commissioned projects. All members of the commissioning groups were invited to participate in collaborative enquiry groups which participated actively in the analysis process. Results The virtual process functioned as intended, reaching timely and relatively transparent decisions that participants had confidence in. Despite the potential for greater access using a virtual approach, few differences were found in practice. Key advantages included physical access, a more flexible and extended time period for discussion, reflection and information gathering and a more transparent decision-making process. Key challenges were the reduction of social cues available in a computer-mediated medium that require novel ways of ensuring appropriate dialogue, feedback and interaction. However, in both modes, the process was influenced by a range of factors and was not technology driven. Conclusion There is potential for using computer-mediated communication within

  5. Commissioning of research reactors. Safety guide

    International Nuclear Information System (INIS)

    2006-01-01

    The objective of this Safety Guide is to provide recommendations on meeting the requirements for the commissioning of research reactors on the basis of international best practices. Specifically, it provides recommendations on fulfilling the requirements established in paras 6.44 and 7.42-7.50 of International Atomic Energy Agency, Safety of Research Reactors, IAEA Safety Standards Series No. NS-R-4, IAEA, Vienna (2005) and guidance and specific and consequential recommendations relating to the recommendations presented in paras 615-621 of International Atomic Energy Agency, Safety in the Utilization and Modification of Research Reactors, Safety Series No. 35-G2, IAEA, Vienna (1994) and paras 228-229 of International Atomic Energy Agency, Safety Assessment of Research Reactors and Preparation of the Safety Analysis Report, Safety Series No. 35-G1, IAEA, Vienna (1994). This Safety Guide is intended for use by all organizations involved in commissioning for a research reactor, including the operating organization, the regulatory body and other organizations involved in the research reactor project

  6. Swiss Federal Energy Research Commission - Annual report 2009

    International Nuclear Information System (INIS)

    Maus, K.

    2010-02-01

    This annual report for the Swiss Federal Office of Energy (SFOE) provides an overview of the work carried out by the Swiss Federal Energy Research Commission CORE in 2009. The commission's main work included preparation work for the revised energy research concept for the period 2013 - 2016, a review of all research programmes operated by the Swiss Federal Office of Energy SFOE, the enhancement of cooperation with public and private research and promotion institutions, the coordination and consultation of research institutions and the improvement of international information exchange. The report summarises coordination work with the many CORE programmes and defines strategic main areas of interest for future work

  7. Nuclear safety research at the European Commission's Joint Research Centre

    International Nuclear Information System (INIS)

    Toerroenen, K.

    2003-01-01

    Nuclear power plants currently generate some 35 % of electricity used in the European Union and applicant countries. Nuclear safety will therefore remain a priority for the EU, particularly in view of enlargement, the need to monitor ageing nuclear installations and the licencing of advanced new reactor systems. The European Commission's Joint Research Centre (JRC), with its long involvement and recognised competence in nuclear safety related activities, provides direct support to the European Commission services responsible for nuclear safety and civil protection. (author)

  8. The U.S. Nuclear Regulatory Commission seismic safety research program

    International Nuclear Information System (INIS)

    Kenneally, R.M.; Guzy, D.J.; Murphy, A.J.

    1988-01-01

    The seismic safety research program sponsored by the U.S. Nuclear Regulatory Commission is directed toward improving the evaluation of potential earthquake effects on nuclear power plant operations. The research has been divided into three major program areas: earth sciences, seismic design margins, and fragilities and response. A major thrust of this research is to assess plant behavior for seismic events more severe and less probable than those considered in design. However, there is also research aimed at improving the evaluation of earthquake input and plant response at plant design levels

  9. National evaluation commission relative to the researches on the radioactive wastes management

    International Nuclear Information System (INIS)

    2004-01-01

    Implemented in april 1994, the National Evaluation Commission (CNE) continues in this tenth report, its study on the radioactive wastes management following the three axis defined by the 1991 law: separation and transmutation, underground disposal, conditioning and log time storage. This report takes stock on the CNE activity in 2003 as on the researches advances around these three axis. In the framework of the international cooperation, the commission details also the researches and realizations abroad. (A.L.B.)

  10. U.S. Nuclear Regulatory Commission natural analogue research program

    International Nuclear Information System (INIS)

    Kovach, L.A.; Ott, W.R.

    1995-01-01

    This article describes the natural analogue research program of the U.S. Nuclear Regulatory Commission (US NRC). It contains information on the regulatory context and organizational structure of the high-level radioactive waste research program plan. It also includes information on the conditions and processes constraining selection of natural analogues, describes initiatives of the US NRC, and describes the role of analogues in the licensing process

  11. National Nuclear Research Institute, Ghana Atomic Energy Commission: Annual Report 2014

    International Nuclear Information System (INIS)

    2014-01-01

    This annual report covers the research and commercial activities of the National Nuclear Research Institute of the Ghana Atomic Energy Commission for the year 2014. Also listed are the scientific and technical publications issued by staff.

  12. The Commission's research action programme on the development of nuclear fission energy

    International Nuclear Information System (INIS)

    1984-01-01

    For its 'Framework Programme 1984-1987' the Commission has defined the major goals for a European Scientific and Technical Strategy. One of the means to reduce the energy dependence of the Community, which is an important objective, is to favour the development of nuclear fission energy. As electricity production by nuclear reactors has reached industrial maturity, the Community activities are directed mainly to safety aspects, in order to ensure the protection of workers and the general public, against hazards linked to operations in the nuclear fuel cycle. A description of the main features of the five sub-programmes on nuclear fission energy is given below; these programmes are: reactor safety; nuclear fuels and actinides research; management of radioactive waste; safeguarding and management of fissile materials; decommissioning of nuclear installations. The research and development work is carried out either by the Commission's Joint Research Center or by organizations and companies of the Member Countries, with the Commission's financial support. (author)

  13. Yale and the Atomic Bomb Casualty Commission

    International Nuclear Information System (INIS)

    Bowers, J.Z.

    1983-01-01

    This is a description, based largely on personal discussions, of the contributions of men from the Yale University School of Medicine to the saga of the immediate and long-term studies on the medical effects of the atomic bombs at Hiroshima and Nagasaki. They played key roles in the immediate studies of bomb effects, in the creation of long-term studies of delayed effects, and in elevating the Atomic Bomb Casualty Commission after 1955 to a position of excellence in its studies and relations with the Japanese. The accumulation of the information presented in this paper derives from research for the preparation of the history of the Atomic Bomb Casualty Commission. In 1975, the commission was passed to Japanese leadership as the Radiation Effects Research Foundation

  14. 77 FR 9273 - WORKSHOP Sponsored by the Nuclear Regulatory Commission and the Electric Power Research Institute...

    Science.gov (United States)

    2012-02-16

    ... Commission and the Electric Power Research Institute on the Treatment of Probabilistic Risk Assessment.... SUMMARY: The U.S. Nuclear Regulatory Commission (NRC), Office of Nuclear Regulatory Research (RES), in cooperation with the Electric Power Research Institute (EPRI), will hold a joint workshop on the Treatment of...

  15. Radiation protection commissioning of neutron beam instruments at the OPAL research reactor

    International Nuclear Information System (INIS)

    Parkes, Alison; Saratsopoulos, John; Deura, Michael; Kenny, Pat

    2008-01-01

    The neutron beam facilities at the 20 MW OPAL Research Reactor were commissioned in 2007 and 2008. The initial suite of eight neutron beam instruments on two thermal neutron guides, two cold neutron guides and one thermal beam port located at the reactor face, together with their associated shielding were progressively installed and commissioned according to their individual project plans. Radiation surveys were systematically conducted as reactor power was raised in a step-wise manner to 20 MW in order to validate instrument shielding design and performance. The performance of each neutron guide was assessed by neutron energy spectrum and flux measurements. The activation of beam line components, decay times assessments and access procedures for Bragg Institute beam instrument scientists were established. The multiple configurations for each instrument and the influence of operating more than one instrument or beamline simultaneously were also tested. Areas of interest were the shielding around the secondary shutters, guide shield and bunker shield interfaces and monochromator doors. The shielding performance, safety interlock checks, improvements, radiation exposures and related radiation protection challenges are discussed. This paper discusses the health physics experience of commissioning the OPAL Research Reactor neutron beam facilities and describes health physics results, actions taken and lessons learned during commissioning. (author)

  16. Swiss Federal Energy Research Commission - Annual report 2008

    International Nuclear Information System (INIS)

    Maus, K.

    2009-01-01

    This annual report presents a review of the activities carried out by the Swiss Federal Energy Research Commission CORE in the year 2008. Main points of interest were the definition of a new CORE vision, a review of all research programmes, co-operation and co-ordination with public and private institutes, active consultancy, recommendations for further education and training, improved international information exchange and good communication with business, politics and the general public. The definition of a concept for Swiss energy research for the period 2012 to 2016 is mentioned. The annual report also reports on an internal visit made to various laboratories of the Swiss Federal Institute of Technology in Lausanne and the Energy Center in Zurich. The focussing of CORE activities on particular themes is discussed

  17. Geothermal research and development program of the US Atomic Energy Commission

    Science.gov (United States)

    Werner, L. B.

    1974-01-01

    Within the overall federal geothermal program, the Atomic Energy Commission has chosen to concentrate on development of resource utilization and advanced research and technology as the areas most suitable to the expertise of its staff and that of the National Laboratories. The Commission's work in geothermal energy is coordinated with that of other agencies by the National Science Foundation, which has been assigned lead agency by the Office of Management and Budget. The objective of the Commission's program, consistent with the goals of the total federal program is to facilitate, through technological advancement and pilot plant operations, achievement of substantial commercial production of electrical power and utilization of geothermal heat by the year 1985. This will hopefully be accomplished by providing, in conjunction with industry, credible information on the economic operation and technological reliability of geothermal power and use of geothermal heat.

  18. Ethical evaluation of research proposals by ethics panels advising the European Commission.

    Science.gov (United States)

    Kolar, Roman

    2004-06-01

    Ethical principles with regard to animal experimentation are referred to in European Union (EU) legislation and other official documents. Therefore, applications for funding of research under the EU's research programme may undergo an ethical review that is carried out by so-called ethics panels, consisting of experts chosen by the European Commission. The work of these panels differs substantially from that of other ethical committees, as they exist on the institutional, local, regional or national level. Their main purpose is not to decide whether a proposed research can be regarded legal, and therefore should be endorsed or licensed; instead, it is to help the Commission in prioritising its funding. The panels may examine other ethical aspects than those of animal experimentation or animal welfare alone, such as the use of human volunteers. This is reflected by the composition of the panels. Their decisions are normally based on consensus. Even though these decisions may refer to EU legislation, the criteria applied are not restricted to those provided by this legislation. Nevertheless, the various aspects of the Commission's ethical evaluation system (e.g. formal and practical basic conditions, information content of applications, type of decisions taken, lacking of any quality control) offers opportunities for improvement.

  19. Findings by the Commission Evaluating Nuclear Safety and Repository Research in Germany

    International Nuclear Information System (INIS)

    Sandtner, W.; Closs, K.D.

    2000-01-01

    The Commission Evaluating Nuclear Safety and Repository Research in Germany, which had been appointed by the German Federal Ministry of Economics on September 24, 1999, submitted its report. Here is the gist of the Commission's findings: Irrespective of the criteria established with the political decision to terminate the use of nuclear power in Germany, competence in nuclear safety must be maintained over the next few decades. Only in this way can the government perform its duty and make provisions for the future, and can the safety of nuclear facilities and waste management pathways be ensured in accordance with the international state of the art. In view of the considerable reduction in funding in recent years and also in future, measures must be taken to ensure that further decreases in-roject funding and institutionalized government financing are excluded so as to avoid further declines in terms of manpower and competence in this field. Reactor safety and repository research must be financed at a level allowing the federal government to discharge its legal duties. The full report by the Commission, with its annexes, is available on the GRS web site (http://www.grs.de) as a PDF file. (orig.) [de

  20. International radiation commissions 1896 to 2008. Research into atmospheric radiation from IMO to IAMAS

    International Nuclear Information System (INIS)

    Bolle, H.J.; Moeller, F.; London, J.

    2008-01-01

    The document covers a historical compilation on research into atmospheric radiation from 1896 to 2008. The first part is a brief history of the radiation commissions of IMO (International Meteorological Organization) and IUGG (International Union of Geodesy and Geophysics) for the period 1824 to 1948. Part 2 Covers the International Radiation Commission (IRC) of IAM (International Association of Meteorology)/IAMAS (International Association of Meteorology and Atmospheric Sciences)/IAMAP (International Association of Meteorology and Atmospheric Physics); the Re-constitution of the IUGG Radiation Commision, the Officers of the International Radiation Commission of IUUG 1948-2008, and the activities of the Radiation Commision of the IUGG 1948-2008. The appendices include the Radiation Commission Members, the summaries of presented papers from 1954 and 1957, the IRC publications, and acronyms

  1. International radiation commissions 1896 to 2008. Research into atmospheric radiation from IMO to IAMAS

    Energy Technology Data Exchange (ETDEWEB)

    Bolle, H J [comp.; Moeller, F; London, J

    2008-05-15

    The document covers a historical compilation on research into atmospheric radiation from 1896 to 2008. The first part is a brief history of the radiation commissions of IMO (International Meteorological Organization) and IUGG (International Union of Geodesy and Geophysics) for the period 1824 to 1948. Part 2 Covers the International Radiation Commission (IRC) of IAM (International Association of Meteorology)/IAMAS (International Association of Meteorology and Atmospheric Sciences)/IAMAP (International Association of Meteorology and Atmospheric Physics); the Re-constitution of the IUGG Radiation Commision, the Officers of the International Radiation Commission of IUUG 1948-2008, and the activities of the Radiation Commision of the IUGG 1948-2008. The appendices include the Radiation Commission Members, the summaries of presented papers from 1954 and 1957, the IRC publications, and acronyms.

  2. National evaluation commission relative to the researches on the radioactive wastes management; Commission nationale d'evaluation relative aux recherches sur la gestion des dechets radioactifs

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-07-01

    Implemented in april 1994, the National Evaluation Commission (CNE) continues in this tenth report, its study on the radioactive wastes management following the three axis defined by the 1991 law: separation and transmutation, underground disposal, conditioning and log time storage. This report takes stock on the CNE activity in 2003 as on the researches advances around these three axis. In the framework of the international cooperation, the commission details also the researches and realizations abroad. (A.L.B.)

  3. Part of the inter ministerial commission of artificial radioelements (cirea) in the areas of medicine, research and industry

    International Nuclear Information System (INIS)

    Fages, D.Ph.

    2000-01-01

    The Inter ministerial commission of artificial radioelements (C.I.R.E.A.) has been implemented to regulate the production, import, use of artificial radioelements. It gives advices in areas such preparation, import, export, fabrication, calibration, transport, transfer as well as the general conditions of use, the measures of protection against the effects of radiations. The commission is divided in two sections: for the first one, it treats the questions relative to medical practices and human biology, for the second one it treats questions relative to others areas( agriculture, industry, research else than medical one). (N.C.)

  4. Assessment of the implementation of a neutron measurement system during the commissioning of the Jordan Research and Training Reactor

    Energy Technology Data Exchange (ETDEWEB)

    Bae, Sang Hoon; Suh, Sang Mun [Division of Research Reactor System Design, Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of); Cha, Han Ju [Dept. of Electrical Engineering, Intelligent Power Conversion Laboratory, Chungnam National University, Daejeon (Korea, Republic of)

    2017-04-15

    The Jordan Research and Training Reactor (JRTR) is the first research reactor in Jordan, the commissioning of which is ongoing. The reactor is a 5-MWth, open-pool type, light-water-moderated, and cooled reactor with a heavy water reflector system. The neutron measurement system (NMS) applied to the JRTR employs a wide-range fission chamber that can cover from source range to power range. A high-sensitivity boron trifluoride counter was added to obtain more accurate measurements of the neutron signals and to calibrate the log power signals; the NMS has a major role in the entire commissioning stage. However, few case studies exist concerning the application of the NMS to a research reactor. This study introduces the features of the NMS and the boron trifluoride counter in the JRTR and shares valuable experiences from lessons learned from the system installation to its early commissioning. In particular, the background noise relative to the signal-to-noise ratio and the NMS signal interlock are elaborated. The results of the count rates with the neutron source and the effects of the discriminator threshold are summarized.

  5. Radiation research within the framework programmes of the European Commission

    Energy Technology Data Exchange (ETDEWEB)

    Karaoglou, A.; Kelly, G.N.; Desmet, G.; Menzel, H.G.; Schibilla, H.; Olast, M.; Gasperini, F.; Chadwick, K.H.; Sinnave, J. [European Commission Directorate General science, Brussels (Belgium). Research and Development, Radiation Protection Research Action

    1997-09-01

    The background to the radiation protection research and training programme of the European Commission is described in the presentation. The objectives and achievements of the third framework programme are summarised together with a description of how the achievements led to the establishment of the priorities for the fourth framework programme. Indications on the preliminary prospects for the fifth framework programme, 1998-2002 are also given. (6 refs.).

  6. Radiological and Medical Sciences Research Institute, Ghana Atomic Energy Commission: Annual Report 2014

    International Nuclear Information System (INIS)

    2014-01-01

    The Radiological and Medical Sciences Research Institute was established in 2009, as the forth research institute of the Ghana Atomic Energy Commission. This Annual Report provides an overview of the major activities of the Institutes in the year 2014. Major items covered in the report include: Strategic objectives; Collaborations; Personnel and Organisational Structure; Facilities and Technical Services; Summary of Research and Development Projects; Human Resource Development; Publications and Technical Reports.

  7. Beam commissioning of the 3-GeV rapid cycling synchrotron of the Japan Proton Accelerator Research Complex

    Directory of Open Access Journals (Sweden)

    H. Hotchi

    2009-04-01

    Full Text Available The 3-GeV rapid cycling synchrotron (RCS of the Japan Proton Accelerator Research Complex (J-PARC was commissioned in October 2007, and successfully accomplished 3 GeV acceleration on October 31. Six run cycles through February 2008 were dedicated to commissioning the RCS, for which the initial machine parameter tuning and various underlying beam studies were completed. Then since May 2008 the RCS beam has been delivered to the downstream facilities for their beam commissioning. In this paper we describe beam tuning and study results following our beam commissioning scenario and a beam performance and operational experience obtained in the first commissioning phase through June 2008.

  8. Australian Atomic Energy Commission: A new energy research establishment at Lucas Heights

    Energy Technology Data Exchange (ETDEWEB)

    Moyal, A [Sydney Univ. (Australia). Dept. of Government and Public Administration

    1980-02-01

    A review of the role of the Atomic Energy Commission has recommended that the Lucas Heights establishment should engage in research on energy sources in general, rather than nuclear only as at present, and that certain of its present functions (regulatory and manufacturing) should be handled by other organisations.

  9. Some Main Results of Commissioning of the Dalat Research Reactor with Low Enriched Fuel

    International Nuclear Information System (INIS)

    Nguyen Nhi Dien; Luong Ba Vien; Pham Van Lam; Le Vinh Vinh; Huynh Ton Nghiem

    2014-01-01

    After completion of design calculation of the Dalat Nuclear Research Reactor (DNRR) for conversion from high-enriched uranium fuel (HEU) to low-enriched uranium (LEU) fuel, the commissioning programme for DNRR with entire core loaded with LEU fuel was successfully carried out from 24 November 2011 to 13 January 2012. The experimental results obtained during the implementation of commissioning programme showed a good agreement with design calculations and affirmed that the DNRR with LEU core have met all safety and exploiting requirements. (author)

  10. Bioethics commission to review gene patenting

    Energy Technology Data Exchange (ETDEWEB)

    Rothenburg, L.

    1995-12-01

    In October, in an unexpected development, U.S. President Bill Clinton created a national ethics advisory board, the National Bioethics Advisory Commission (NBAC, Washington, DC), to study both research ethics and the management and use of genetic information. Of particular interest to biotechnology companies and researchers is the fact that the commission`s brief encompasses issues about human gene patenting, a subject not contained in earlier proposals for the commission.

  11. Reactor safety research program. A description of current and planned reactor safety research sponsored by the Nuclear Regulatory Commission's Division of Reactor Safety Research

    International Nuclear Information System (INIS)

    1975-06-01

    The reactor safety research program, sponsored by the Nuclear Regulatory Commission's Division of Reactor Safety Research, is described in terms of its program objectives, current status, and future plans. Elements of safety research work applicable to water reactors, fast reactors, and gas cooled reactors are presented together with brief descriptions of current and planned test facilities. (U.S.)

  12. U.S. Radioecology Research Programs of the Atomic Energy Commission in the 1950s

    Energy Technology Data Exchange (ETDEWEB)

    Reichle, D.E.

    2004-01-12

    This report contains two companion papers about radiological and environmental research that developed out of efforts of the Atomic Energy Commission in the late 1940s and the 1950s. Both papers were written for the Joint U.S.-Russian International Symposium entitled ''History of Atomic Energy Projects in the 1950s--Sociopolitical, Environmental, and Engineering Lessons Learned,'' which was hosted by the International Institute for Applied Systems Analysis in Laxemberg, Austria, in October 1999. Because the proceedings of this symposium were not published, these valuable historic reviews and their references are being documented as a single ORNL report. The first paper, ''U.S. Radioecology Research Programs Initiated in the 1950s,'' written by David Reichle and Stanley Auerbach, deals with the formation of the early radioecological research programs at the U.S. Atomic Energy Commission's nuclear production facilities at the Clinton Engineering Works in Oak Ridge, Tennessee; at the Hanford Plant in Richland, Washington; and at the Savannah River Plant in Georgia. These early radioecology programs were outgrowths of the environmental monitoring programs at each site and eventually developed into the world renowned National Laboratory environmental program sponsored by the Office of Biological and Environmental Research of the U.S. Department of Energy. The original version of the first paper was presented by David Reichle at the symposium. The second paper, ''U.S. Atomic Energy Commission's Environmental Research Programs Established in the 1950s,'' summarizes all the environmental research programs supported by the U.S. Atomic Energy Commission in the 1950s and discusses their present-day legacies. This paper is a modified, expanded version of a paper that was published in September 1997 in a volume commemorating the 50th anniversary symposium of the U.S. Department of Energy's Office of

  13. Atomic Energy Commission Act, 2000 (Act 588)

    International Nuclear Information System (INIS)

    2000-01-01

    Act 588 of the Republic of Ghana entitled, Atomic Energy Commission Act, 2000, amends and consolidates the Atomic Energy Commission Act, 204 of 1963 relating to the establishment of the Atomic Energy Commission. Act 588 makes provision for the Ghana Atomic Energy Commission to establish more institutes for the purpose of research in furtherance of its functions and also promote the commercialization of its research and development results. (E.A.A.)

  14. Research on nuclear energy within the European Commission Research Framework Programme

    International Nuclear Information System (INIS)

    Forsstroem, H.

    2000-01-01

    The strategic goal of the 5 th EURATOM RTD Framework Programme (FP5) is to help exploit the full potential of nuclear energy in a sustainable manner, by making current technologies even safer and more economical and by exploring promising new concepts. The programme covers nuclear fusion, nuclear fission and radiation protection. Part of the programme on nuclear fission and radiation protection is being implemented through ''indirect actions'', i.e. research co-sponsored (up to 50% of total costs) and co-ordinated by DG RESEARCH of the European Commission (EC) but carried out by external public and private organisations as multi-partner projects. The budget available for these indirect actions during FP5 (1998-2002) is 191 MEuro. The programme covers four different areas: safety of existing reactors, including plant life management, severe accident management and development of evolutionary systems; safety of the fuel cycle, including radioactive waste management and disposal, partitioning and transmutation and decommissioning of nuclear installation; safety of future systems, including new or revisited reactor or fuel cycle concepts; radiation protection and radiological sciences, including both basic radiobiology and radiophysics and issues connected to the application of radiation protection. After the first calls for proposals of FP5, which were evaluated in 1999 about 140 research projects have been selected for funding and is now in the process of starting. In parallel the research projects that were supported in the 4th Framework Programme (1994 - 1998) are coming to an end, and being reported, at the same time as the first thoughts on the 6 t h FP are discussed.An important new component for the future research in Europe is the concept of a European Research Area (ERA). The purpose of ERA is to create better overall framework conditions for research in Europe. Some of the concepts being discussed in this context are networking of centres of excellence, a

  15. The grave is wide: the Hibakusha of Hiroshima and Nagasaki and the legacy of the Atomic Bomb Casualty Commission and the Radiation Effects Research Foundation.

    Science.gov (United States)

    O'Malley, Gerald F

    2016-07-01

    Following the atomic bomb attacks on Japan in 1945, scientists from the United States and Japan joined together to study the Hibakusha - the bomb affected people in what was advertised as a bipartisan and cooperative effort. In reality, despite the best efforts of some very dedicated and earnest scientists, the early years of the collaboration were characterized by political friction, censorship, controversy, tension, hostility, and racism. The 70-year history, scientific output and cultural impact of the Atomic Bomb Casualty Commission and the Radiation Effects Research Foundation are described in the context of the development of Occupied Japan.

  16. Commission of the european communities. Joint research centre. Petten Establishment. Annual Report 1977

    International Nuclear Information System (INIS)

    1977 marked the beginning of a new multiannual research programme for the European Commission's Joint research Centre. Regarding the exploitation of HFR (High Flux Reactor), the year was one of steady, on-schedule operation with high utilization, although this fell off slightly in the autumn due to overloading of our capsule project engineering team and manufacturing services. We are pleased to note that the HFR Users' Meeting, held in October, drew about 100 participants from Europe and America and demonstrated a lively interest in the Commission's materials testing reactor. Technical improvements to the plant are being examined as one means of maintaining or even increasing this interest in the 1980's. Following the wishes of the Council of Ministers, new Advisory Committees for Programme Management have been set up for all the Joint Research Centre's activities and those for HFR and High Temperature Materials Programmes have met at Petten. This latter Committee is entirely new to its task, the programme having been served until 1977 by a number of ad hoc meetings of national experts. The work of the Organic Chemistry Laboratory falls under the wings of the Community Reference Bureau Advisory Committee, who have met in Brussels and strongly encouraged the development of the activity

  17. Ghana Atomic Energy Commission: Annual Report 2001

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-07-01

    This report covers the activities and research progams of the Ghana Atomic Energy Commission for the year 2001. The research programs and associated publications have been grouped under the three main institutes of the Commission namely National Nuclear Research Institute, Radiation Protection Institute and Biotechnology and Nuclear Agricultre Research Institute.

  18. Ghana Atomic Energy Commission: Annual Report 2001

    International Nuclear Information System (INIS)

    2002-01-01

    This report covers the activities and research progams of the Ghana Atomic Energy Commission for the year 2001. The research programs and associated publications have been grouped under the three main institutes of the Commission namely National Nuclear Research Institute, Radiation Protection Institute and Biotechnology and Nuclear Agricultre Research Institute

  19. Radiation Effects Research Foundation

    International Nuclear Information System (INIS)

    1979-01-01

    The last day of March 1978 marked the completion of the first 3 years of operation of the Radiation Effects Research Foundation in Hiroshima and Nagasaki. RERF was established on 1 April 1975 as successor to the Atomic Bomb Casualty Commission which had been in continuous operation since 1947. This record of the first 3 years of operation consists of selected reports and other documents prepared in the course of conducting the business of RERF and includes a brief history, a late radiation effects that might be conducted at RERF. The wisdom and thought given to the research program and its operation by the Scientific Council and the Board of Directors is reflected in the minutes of their meetings which are included in the Appendix. (Mori, K.)

  20. The role of effective communications in Nuclear Regulatory Commission licensing

    International Nuclear Information System (INIS)

    Counsil, W.G.

    1991-01-01

    Communications are essential to the licensing and general regulatory program of the Nuclear Regulatory Commission. This paper attempts to identify and address certain aspects of, and approaches to, maintaining effective and efficient communications. It considers, from the perspective of the high-level radioactive waste repository program, both internal communication within the DOE itself and external communication with the Nuclear Regulatory Commission and interested parties. Many of the points presented are based on lessons learned from electric utility experience with nuclear plants

  1. European Commission research on aircraft impacts in the atmosphere

    Energy Technology Data Exchange (ETDEWEB)

    Amanatidis, G T; Angeletti, G [European Commission (CEC), Brussels (Belgium)

    1998-12-31

    Aircraft engines release in the troposphere and lower stratosphere a number of chemical compounds (NO{sub x}, CO{sub 2}, CO, H{sub 2}O, hydrocarbons, sulphur, soot, etc.) which could potentially affect the ozone layer and the climate through chemical, dynamical and radiative changes. The global amount of gases and particles emitted by current subsonic and projected supersonic aircraft fleets can be estimated, but significant uncertainties remain about the fate of these emissions in the atmosphere. The European efforts concerning these potential atmospheric impacts of aircraft emissions are conducted by the Environment and Climate Research Programme of the European Commission (EC) as well as by national programmes of the Member States of the European Union (EU). The European research activities in this field, are described, divided for practical reasons in two periods. The first includes activities supported under the 3. Framework Programme for R and D activities which covered the period from 1992 up to 1996, while the second period has started in early 1996 and is supported under the 4. Framework Programme. (R.P.) 6 refs.

  2. European Commission research on aircraft impacts in the atmosphere

    Energy Technology Data Exchange (ETDEWEB)

    Amanatidis, G.T.; Angeletti, G. [European Commission (CEC), Brussels (Belgium)

    1997-12-31

    Aircraft engines release in the troposphere and lower stratosphere a number of chemical compounds (NO{sub x}, CO{sub 2}, CO, H{sub 2}O, hydrocarbons, sulphur, soot, etc.) which could potentially affect the ozone layer and the climate through chemical, dynamical and radiative changes. The global amount of gases and particles emitted by current subsonic and projected supersonic aircraft fleets can be estimated, but significant uncertainties remain about the fate of these emissions in the atmosphere. The European efforts concerning these potential atmospheric impacts of aircraft emissions are conducted by the Environment and Climate Research Programme of the European Commission (EC) as well as by national programmes of the Member States of the European Union (EU). The European research activities in this field, are described, divided for practical reasons in two periods. The first includes activities supported under the 3. Framework Programme for R and D activities which covered the period from 1992 up to 1996, while the second period has started in early 1996 and is supported under the 4. Framework Programme. (R.P.) 6 refs.

  3. National Capital Planning Commission Meeting Transcripts

    Data.gov (United States)

    National Capital Planning Commission — Transcripts of the monthly (with the exception of August) National Capital Planning Commission meeting transcripts are provided for research to confirm actions taken...

  4. Commission errors of active intentions: the roles of aging, cognitive load, and practice.

    Science.gov (United States)

    Boywitt, C Dennis; Rummel, Jan; Meiser, Thorsten

    2015-01-01

    Performing an intended action when it needs to be withheld, for example, when temporarily prescribed medication is incompatible with the other medication, is referred to as commission errors of prospective memory (PM). While recent research indicates that older adults are especially prone to commission errors for finished intentions, there is a lack of research on the effects of aging on commission errors for still active intentions. The present research investigates conditions which might contribute to older adults' propensity to perform planned intentions under inappropriate conditions. Specifically, disproportionally higher rates of commission errors for still active intentions were observed in older than in younger adults with both salient (Experiment 1) and non-salient (Experiment 2) target cues. Practicing the PM task in Experiment 2, however, helped execution of the intended action in terms of higher PM performance at faster ongoing-task response times but did not increase the rate of commission errors. The results have important implications for the understanding of older adults' PM commission errors and the processes involved in these errors.

  5. A Virtual Commissioning Learning Platform

    DEFF Research Database (Denmark)

    Mortensen, Steffen; Madsen, Ole

    2018-01-01

    The introduction of reconfigurable manufacturing systems (RMS), Industry 4.0 and the associated technologies requires the establishment of new competencies. Towards that goal, Aalborg University (AAU) has developed an Industry 4.0 learning factory, the AAU Smart Production Lab. The AAU Smart...... Production Lab integrates a number of Industry 4.0 technologies for learning and research purposes. One of the many techniques is virtual commissioning. Virtual commissioning uses a virtual plant model and real controllers (PLCs) enabling a full emulation of the manufacturing system for verification. Virtual...... commissioning can lower the commissioning time up to 63%, allowing faster time to market. However, virtual commission is still missing industrial impact one of the reasons being lack of competencies and integration experiences. The paper presents the setup of the virtual commissioning learning platform...

  6. 29 CFR 1621.4 - Effect of opinions and interpretations of the Commission.

    Science.gov (United States)

    2010-07-01

    .... 1621.4 Section 1621.4 Labor Regulations Relating to Labor (Continued) EQUAL EMPLOYMENT OPPORTUNITY COMMISSION PROCEDURES-THE EQUAL PAY ACT § 1621.4 Effect of opinions and interpretations of the Commission. (a) Section 10 of the Portal to Portal Act of 1947, 29 U.S.C. 255, which applies to the Equal Pay Act of 1963...

  7. Managing vital records in the Ghana Atomic Energy Commission

    International Nuclear Information System (INIS)

    Osei, Mary Mavis

    2004-05-01

    Several vital records can be found within the Ghana Atomic Energy Commission. Some of these records include confidential files on staff and general purpose files on staff, specialised subject files on IAEA, FAO, UN agencies etc, records on agreements from memorandum of understanding between the commission and other organisations, legislative instruments establishing the commission and its institutes and research publications. The study critically examined how these vital records at the Ghana Atomic Energy Commission were managed with the view of identifying problems and to propose actions for improvement. The specific objectives of the study was to examine methods of storage, security measures put in place to manage vital records, committment of management and staff to these measures, quality of records staff and vital records policy. Recommendations have been provided to help in the efficient and effective management of records in the commission. (A.B.)

  8. THE POTENTIAL AND LIMITATIONS OF TRUTH AND RECONCILIATION COMMISSIONS IN GENERATING JUDICIAL AND NON-JUDICIAL EFFECTS. THE PRESIDENTIAL COMMISSION FOR THE ANALYSIS OF THE COMMUNIST DICTATORSHIP IN ROMANIA.

    Directory of Open Access Journals (Sweden)

    Bianca Elena RADU

    2017-05-01

    Full Text Available The transition periods that succeed totalitarian regimes are characterized by the efforts of new governments to recognize the violations of human rights that were committed in the past, to implement legitimate mechanisms to clarify the causes but also the consequences of the violation of human rights by the previous regimes, both at the individual and community level. The truth commissions represent one of these mechanisms, concentrating on the testimonies of the victims and on the recognition of their suffering. Depending on the case, the recommendations of the truth commissions have the role of generating judicial and non-judicial effects, of contributing and completing the bringing into effect of the penal justice, of facilitating the processes of restoration, of preventing the re-iteration of new abuses. The present paper proposes to analyse the limitations and the transformative potential of the recommendations included in the report done by the Presidential Commission for the analysis of the communist dictatorship in Romania. We will analyse whether the information contained in this report has been useful in the judicial procedures (prosecutorial indictment and judges’ motivation which resulted in the conviction of Ioan Ficior and Alexandru Vișinescu, but also on other two civil sentences. The research approach imposes the use of a content analysis of the official and public documents, a comparative analysis and a historic analysis.

  9. The Effects of Discrete-Trial Training Commission Errors on Learner Outcomes: An Extension

    Science.gov (United States)

    Jenkins, Sarah R.; Hirst, Jason M.; DiGennaro Reed, Florence D.

    2015-01-01

    We conducted a parametric analysis of treatment integrity errors during discrete-trial training and investigated the effects of three integrity conditions (0, 50, or 100 % errors of commission) on performance in the presence and absence of programmed errors. The presence of commission errors impaired acquisition for three of four participants.…

  10. Time for Change? Climate Science Reconsidered: Report of the UCL Policy Commission on Communicating Climate Science, 2014

    OpenAIRE

    Rapley, C. G.; De Meyer, K.; Carney, J.; Clarke, R.; Howarth, C.; Smith, N.; Stilgoe, J.; Youngs, S.; Brierley, C.; Haugvaldstad, A.; Lotto, B.; Michie, S.; Shipworth, M.; Tuckett, D.

    2014-01-01

    The UCL Policy Commission on the Communication of Climate Science, chaired by Professor Chris Rapley comprises a cross-disciplinary project group of researchers from psychology, neuroscience, science and technology studies, earth sciences and energy research. The Commission examined the challenges faced in communicating climate science effectively to policy-makers and the public, and the role of climate scientists in communication. / The Commission explored the role of climate scientists in c...

  11. Primary care-led commissioning: applying lessons from the past to the early development of clinical commissioning groups in England.

    Science.gov (United States)

    Checkland, Kath; Coleman, Anna; McDermott, Imelda; Segar, Julia; Miller, Rosalind; Petsoulas, Christina; Wallace, Andrew; Harrison, Stephen; Peckham, Stephen

    2013-09-01

    The current reorganisation of the English NHS is one of the most comprehensive ever seen. This study reports early evidence from the development of clinical commissioning groups (CCGs), a key element in the new structures. To explore the development of CCGs in the context of what is known from previous studies of GP involvement in commissioning. Case study analysis from sites chosen to provide maximum variety across a number of dimensions, from September 2011 to June 2012. A case study analysis was conducted using eight detailed qualitative case studies supplemented by descriptive information from web surveys at two points in time. Data collection involved observation of a variety of meetings, and interviews with key participants. Previous research shows that clinical involvement in commissioning is most effective when GPs feel able to act autonomously. Complicated internal structures, alongside developing external accountability relationships mean that CCGs' freedom to act may be subject to considerable constraint. Effective GP engagement is also important in determining outcomes of clinical commissioning, and there are a number of outstanding issues for CCGs, including: who feels 'ownership' of the CCG; how internal communication is conceptualised and realised; and the role and remit of locality groups. Previous incarnations of GP-led commissioning have tended to focus on local and primary care services. CCGs are keen to act to improve quality in their constituent practices, using approaches that many developed under practice-based commissioning. Constrained managerial support and the need to maintain GP engagement may have an impact. CCGs are new organisations, faced with significant new responsibilities. This study provides early evidence of issues that CCGs and those responsible for CCG development may wish to address.

  12. Sustainable and resource efficient intensivation of crop production - Perspectives of agro-ecosystem research Policy paper of the DFG Senate Commission on Agroecosystem Research

    NARCIS (Netherlands)

    Wolters, V.; Isselstein, J.; Stützel, H.; Ordon, F.; Haaren, von C.; Schlecht, E.; Wesseler, J.H.H.; Birner, R.; Lützow, von M.; Brüggemann, N.; Diekkrüger, B.; Fangmeier, A.; Flessa, H.; Kage, H.; Kaupenhohann, M.; Kögel-Knabner, I.; Mosandl, R.; Seppelt, R.

    2014-01-01

    With its policy paper the Senate Commission on Agro-ecosystemResearch of the Deutsche Forschungsgemeinschaft(DFG) summarizes potential benefits of basic researchfor the sustainable intensification of crop production. Agro-ecosystems critically contribute to fulfilling the need forincreasing food and

  13. Tritium research and technology facilities for fusion inside the Bruyeres-le-Chatel Research Center of the French Atomic Energy Commission

    International Nuclear Information System (INIS)

    Hircq, B.

    1990-01-01

    Because of a large tritium experience in the Bruyeres-le-Chatel Research Center (Atomic Energy Commission-FRANCE), new activities could be undertaken in 1986 inside the European Fusion Technology Program, especially tritium studies within the frame work of the Next European Torus. After presenting the general tritium research program which concerns the Torus Exhaust Gas Processing (deuterium-tritium purification and storage) and involved materials (weldability of tritium-helium containing steels and corrosion of steels by tritiated water), major obtained results are given before describing the associated equipments. (orig.)

  14. Swiss Federal Energy Research Commission - Annual report 2008; Eidgenoessische Energieforschungskommission CORE. Jahresbericht 2008

    Energy Technology Data Exchange (ETDEWEB)

    Maus, K.

    2009-07-01

    This annual report presents a review of the activities carried out by the Swiss Federal Energy Research Commission CORE in the year 2008. Main points of interest were the definition of a new CORE vision, a review of all research programmes, co-operation and co-ordination with public and private institutes, active consultancy, recommendations for further education and training, improved international information exchange and good communication with business, politics and the general public. The definition of a concept for Swiss energy research for the period 2012 to 2016 is mentioned. The annual report also reports on an internal visit made to various laboratories of the Swiss Federal Institute of Technology in Lausanne and the Energy Center in Zurich. The focussing of CORE activities on particular themes is discussed

  15. The role of national ethics commissions in Finland.

    Science.gov (United States)

    Halila, Ritva

    2003-08-01

    There are six national ethics commissions in Finland. The National Advisory Board on Research Ethics was first established in 1991, followed by the National Advisory Board on Biotechnology and the Board on Gene Technology in 1995. The National Advisory Board on Health Care Ethics was established in 1998, followed by its Sub-Committee on Medical Research Ethics in 1999. The Co-operation Group for Laboratory Animal Sciences was established in 2001. Only the Board on Gene Technology works as a national authority and gives binding opinions and recommendations about the use of genetically modified organisms. The Sub-Committee on Medical Research Ethics acts a national research ethics committee and gives opinions about research projects. Other advisory boards do not make legally binding decisions, but their expertise gives a lot of power to their opinions and statements. The commissions work in close collaboration with each other, having regular meetings. They arrange seminars and conferences, and share information with each other. The commissions also share duties and information in international collaboration. How the voice and opinions of these commissions is heard in society lies in the wide, multi-professional expertise of their members. Large commissions and wide expertise may make it difficult to find consensus in their opinions and statements, although wide expertise may, more than discussion in a small expert group, help to further process difficult ethical issues. Collaboration between different bodies is important in order to share duties, and also to add more emphasis to the statements and opinions where different bodies share interests. In our country, the interest that national commissions share is research ethics, where the advisory boards and their members have discharged collaborative activities for years.

  16. Radioactive waste management: outline of the research programme of the Commission of the European Communities

    International Nuclear Information System (INIS)

    Bresesti, M.

    1980-01-01

    The lines of activity, the main achievements and the perspectives of the research programme of the Commission of the European Communities on radioactive waste management, are presented. In particular an overall view of the activity on chemical separation and nuclear transmutation of actinides is given, as introduction to the various presentations of the JRC staff on specific aspects of this waste management strategy

  17. Charities' response to the European Commission call of interest for their involvement in the European Research Area

    CERN Document Server

    Sessano, D.

    2003-01-01

    This paper presents an exploratory study to investigate what could be the role of the charities concerned with scientific research in the European Research Area (ERA). The analysis particularly concentrates on UK and Italy. The questions on which the exploratory study was developed are: 1. “In what specific areas of the ERA did the European Commission (EC) for the involvement of charities? And could there be other areas in which charities might participate?” 2. “Given the role and situation of charities in UK and Italy, what role, if any, could they be willing to play in the ERA? Is it the same as the one proposed by the Commission or not?” In order to answer these questions, the following discussion will focus at first on a short overview of the charity sector, both at the general level and at the national level in UK and Italy. Then a brief presentation of the European Research Area will be given. The hypotheses of the study will then be presented, followed by a methodological section. Results wi...

  18. Proceedings of the international workshop on building the new HRA: errors of commission - from research to application

    International Nuclear Information System (INIS)

    2003-01-01

    confusion matrix approach to identifying errors of commission resulting from inaccurate plant instrumentation and, subsequently, operator entry into incorrect procedures. Harold Blackman of INEEL/USA provided an update to the SPAR HRA screening method under development at the US NRC. David Gertman, INEEL/USA, discussed the role of latent maintenance errors in plant events. J. W. Kim of KAERI/Korea showed the development of a new human error analysis procedure for emergency tasks. Leopold Antolin, WANO Paris Centre, provided analysis of the effects of the fidelity of the training simulator on HRA. John Forester, Sandia National Laboratory/USA, reviewed HRA for fire assessments and highlighted needed improvements in HRA quantification of errors of commission. Bruce Hallbert, INEEL/USA, presented profiles of human performance identified through the analysis of operating events. David Gertman, INEEL/USA, provided technical basis and considerations for considering management and organisation factors in PSA. Ali Mosleh, University of Maryland/USA, discussed the topics of model-informed data collection and commission errors in the telephone industry. John Wreathall, John Wreathall and Co./USA, presented a timely overview of the issues involved in selecting a satisfactory HRA method. Gareth Parry, US NRC, discussed needed developments in HRA from a regulatory perspective. Erik Hollnagel, University of Linkoping/Sweden, discussed errors, error mechanisms, and the relationship to systemic performance. US industry and regulatory research plans were discussed as well. George Loignon from the V.C. Summer Power Station discussed the Electric Power Research Institute (EPRI) program for the HRA/PRA Tools Users Group, and Nathan Siu, US NRC, reviewed the NRC Program in Human Reliability Analysis

  19. Interim Report of the Commission to Review the Effectiveness of the National Energy Laboratories

    Energy Technology Data Exchange (ETDEWEB)

    Cohon, Jared L. [Carnegie Mellon Univ., Pittsburgh, PA (United States); Glauthier, T. J. [TJG Energy Associates, LLC., Bloomberg, VA (United States); Augustine, Norman R. [U.S. Dept. of Homeland Security, Washington, DC (United States); Austin, Wanda M. [Aerospace Corporation, El Segundo, CA (United States); Elachi, Charles [California Inst. of Technology (CalTech), Pasadena, CA (United States); Fleury, Paul A. [Yale Univ., New Haven, CT (United States); Hockfield, Susan J. [Massachusetts Inst. of Technology (MIT), Cambridge, MA (United States); Meserve, Richard A. [Covington and Burling LLP, Washington, DC (United States); Murray, Cherry A. [Harvard Univ., Cambridge, MA (United States)

    2015-02-27

    The Commission to Review the Effectiveness of the National Energy Laboratories was charged by Congress in January 2014 to evaluate the mission, capabilities, size, performance, governance, and agency oversight of the 17 Department of Energy (DOE) laboratories. Given the incredibly broad scope and aggressive timeline (the original deadline was February 2015), the Secretary of Energy and Congress agreed to split the task into two phases. This interim report contains the preliminary observations and recommendations gleaned from Phase 1 of the study, which consisted of a literature review; visits to five of the National Laboratories; semi-structured interviews with staff from across the National Laboratories, DOE, other Federal agencies, companies, other non-governmental organizations, and additional interested parties; and presentations at monthly public Commission meetings. The Commission notes that the purpose of the National Laboratories is to provide critical capabilities and facilities in service of DOE’s mission and the needs of the broader national and international science and technology (S&T) community, including other Federal agencies, academia, and private industry. The National Laboratories are successfully fulfilling that mission today. While the Commission believes significant improvements can be made to many aspects of DOE management and governance of the laboratories, those issues do not detract from the National Laboratories’ remarkable contributions to the American public. In Phase 2 the Commission will focus on ways to make the process of carrying out their missions more efficient and effective.

  20. A Study on the Efficient Operating Management of Atomic Energy Commission

    International Nuclear Information System (INIS)

    Yun, Sungwon; Chung, W. S.; Lee, D. S.; Park, S. J.

    2013-04-01

    This study aimed to provide professionals in humanities and social sciences, not only nuclear, with a place for communication by establishing a website of Atomic Energy Commission and people with a place for participation which help the nuclear policy reflect public opinions. By establishing the website of Atomic Energy Commission, experts (including those in humanities and social sciences) can suggest policy agenda and public opinions can be suggested through the place for public participation. Also the website should restrict on indiscreet search by separating sections only for experts and provide experts with a section for active and creative debate on nuclear policy. All the accessible meeting agenda and minutes have been chronologically organized and the findings of the committee have been announced to share with people concerning nuclear policy. In terms of the effective operation of Atomic Energy Commission, research has been conducted for standing committee, regular meeting, activating the commission through system change and expert committee in addition to support for the 2nd meeting of Atomic Energy Committee and the 31st Nuclear Expert Committee. Activation measures to improve the operating system of the commission is proposed as following; changing of the commission's chairman operating system, standing commission regular meeting, activation of subcommittee and expanding and diversifying of agenda

  1. Contributi econometrici della Cowles Commission, 1944-47: uno sguardo retrospettivo

    Directory of Open Access Journals (Sweden)

    L.R. KLEIN

    2013-10-01

    Full Text Available The Cowles Commission's econometric work had a profound effect on economic analysis after the Second World War. Econometrics was a young discipline at that time and the author discusses the principle contributors and their work at the Cowles Commission for Research in Economics. Successful econometrics relies on combining economics with mathematics and statistics. It is also important to remember that quantitative economics does not give results that are robust in very small confidence areas - rather they provide guidance for policy makers and facilitate a better understanding of the economy.  JEL Codes: B23 

  2. Stopping the greenhouse effect - recommendations submitted by the Bundestag Enquete Commission

    International Nuclear Information System (INIS)

    Bach, W.

    1991-01-01

    Details are given about the factors which influence the greenhouse effect and about the impact of the greenhouse effect on the climate. The strategy developed by the enquete commission for the Federal Republic of Germany is essentially based on the international and the EC recommendations for stopping the additional greenhouse effect and for reducing the emission of power-generation trace gases which affect the climate. Different scenarios are analyzed to evaluate the recommended measures. (DG) [de

  3. Radiological emergency preparedness arrangements in the European Commission

    International Nuclear Information System (INIS)

    Tanner, V.

    2002-01-01

    The purpose of this paper is to give an overview of the different procedures established within the European Commission, which are relevant to radiological emergency planning and response. Although emergency preparedness is a national responsibility within the European Union, the Commission has clearly defined operational tasks in terms of emergency information exchange and community foodstuff regulations. In addition the Commission promotes research programmes and training courses in the field

  4. Leadership of healthcare commissioning networks in England: a mixed-methods study on clinical commissioning groups

    Science.gov (United States)

    Zachariadis, Markos; Oborn, Eivor; Barrett, Michael; Zollinger-Read, Paul

    2013-01-01

    Objective To explore the relational challenges for general practitioner (GP) leaders setting up new network-centric commissioning organisations in the recent health policy reform in England, we use innovation network theory to identify key network leadership practices that facilitate healthcare innovation. Design Mixed-method, multisite and case study research. Setting Six clinical commissioning groups and local clusters in the East of England area, covering in total 208 GPs and 1 662 000 population. Methods Semistructured interviews with 56 lead GPs, practice managers and staff from the local health authorities (primary care trusts, PCT) as well as various healthcare professionals; 21 observations of clinical commissioning group (CCG) board and executive meetings; electronic survey of 58 CCG board members (these included GPs, practice managers, PCT employees, nurses and patient representatives) and subsequent social network analysis. Main outcome measures Collaborative relationships between CCG board members and stakeholders from their healthcare network; clarifying the role of GPs as network leaders; strengths and areas for development of CCGs. Results Drawing upon innovation network theory provides unique insights of the CCG leaders’ activities in establishing best practices and introducing new clinical pathways. In this context we identified three network leadership roles: managing knowledge flows, managing network coherence and managing network stability. Knowledge sharing and effective collaboration among GPs enable network stability and the alignment of CCG objectives with those of the wider health system (network coherence). Even though activities varied between commissioning groups, collaborative initiatives were common. However, there was significant variation among CCGs around the level of engagement with providers, patients and local authorities. Locality (sub) groups played an important role because they linked commissioning decisions with

  5. Survey on the virtual commissioning of manufacturing systems

    Directory of Open Access Journals (Sweden)

    Chi G. Lee

    2014-07-01

    Full Text Available This paper reviews and identifies issues in the application of virtual commissioning technology for automated manufacturing systems. While the real commissioning of a manufacturing system involves a real plant system and a real controller, the virtual commissioning deals with a virtual plant model and a real controller. The expected benefits of virtual commissioning are the reduction of debugging and correction efforts during the subsequent real commissioning stage. However, it requires a virtual plant model and hence still requires significant amount time and efforts. Two main issues are identified, the physical model construction of a virtual device, and the logical model construction of a virtual device. This paper reviews the current literature related to the two issues and proposes future research directions to achieve the full utilization of virtual commissioning technology.

  6. Disposition of recommendations of the National Research Council in the report ''Revitalizing Nuclear Safety Research''

    International Nuclear Information System (INIS)

    1988-06-01

    On December 8, 1986, the Committee on Nuclear Safety Research of the National Research Council submitted its report, ''Revitalizing Nuclear Safety Research,'' to the US Nuclear Regulatory Commission (NRC). The Commission and its staff have carefully reviewed the Committee's report and have extensively examined the planning, implementation, and management of NRC research programs in order to respond most effectively to the Committee's recommendations. This report presents the Commission's view of the Committee's report and describes the actions that are under way in response to its recommendations

  7. Review and evaluation of the Nuclear Regulatory Commission safety research program for Fiscal Year 1983. Report to the Congress

    International Nuclear Information System (INIS)

    1982-02-01

    Public Law 95-209 includes a requirement that the Advisory Committee on Reactor Safeguards submit an annual report to Congress on the safety research program of the Nuclear Regulatory Commission. This report presents the results of the ACRS review and evaluation of the NRC safety research program for Fiscal Year 1983. The report contains a number of comments and recommendations

  8. Asking the right questions: Scoping studies in the commissioning of research on the organisation and delivery of health services

    Directory of Open Access Journals (Sweden)

    Peckham Stephen

    2008-07-01

    Full Text Available Abstract Scoping studies have been used across a range of disciplines for a wide variety of purposes. However, their value is increasingly limited by a lack of definition and clarity of purpose. The UK's Service Delivery and Organisation Research Programme (SDO has extensive experience of commissioning and using such studies; twenty four have now been completed. This review article has four objectives; to describe the nature of the scoping studies that have been commissioned by the SDO Programme; to consider the impact of and uses made of such studies; to provide definitions for the different elements that may constitute a scoping study; and to describe the lessons learnt by the SDO Programme in commissioning scoping studies. Scoping studies are imprecisely defined but usually consist of one or more discrete components; most commonly they are non-systematic reviews of the literature, but other important elements are literature mapping, conceptual mapping and policy mapping. Some scoping studies also involve consultations with stakeholders including the end users of research. Scoping studies have been used for a wide variety of purposes, although a common feature is to identify questions and topics for future research. The reports of scoping studies often have an impact that extends beyond informing research commissioners about future research areas; some have been published in peer reviewed journals, and others have been published in research summaries aimed at a broader audience of health service managers and policymakers. Key lessons from the SDO experience are the need to relate scoping studies to a particular health service context; the need for scoping teams to be multi-disciplinary and to be given enough time to integrate diverse findings; and the need for the research commissioners to be explicit not only about the aims of scoping studies but also about their intended uses. This necessitates regular contact between researchers and

  9. Training related research and development conducted at Oak Ridge National Laboratory for the US Nuclear Regulatory Commission

    International Nuclear Information System (INIS)

    Haas, P.M.

    1985-01-01

    For a number of years Oak Ridge National Laboratory (ORNL) has conducted a sizeable program of human factors research and development in support of the Office of Nuclear Regulatory Research of the US Nuclear Regulatory Commission (NRC). The history of this effort has in many ways paralleled the growth of human factors R and D throughout the nuclear industry and the program has contributed to advances in the industry as well as to NRC regulatory and research programs. This paper reviews the major projects and products of the program relevant to training and concludes with an identification of future R and D needs

  10. The U.S. Nuclear Regulatory Commission Thermal-Hydraulic Research Program: Maintaining expertise in a changing environment

    International Nuclear Information System (INIS)

    Sheron, B.W.; Shotkin, L.M.; Baratta, A.J.

    1993-01-01

    Throughout the 1970s and early 1980s, the U.S. Nuclear Regulatory Commission's (NRC's) thermal-hydraulic research program enjoyed ample funding, sponsored extensive experimental and analytical development programs, and attracted worldwide expertise. With the completion of the major experimental programs and with the promulgation of the revised emergency core-cooling system rule, both the funding and prominence of thermal-hydraulic research at the NRC have declined in recent years. This has led justifiably to the concern by some that the program may no longer have the minimal elements needed to maintain both expertise and world-class status. The purpose of this article is to describe the NRC's current thermal-hydraulic research program and to show how this program ensures maintenance of a viable, robust research effort and retention of needed expertise and international leadership

  11. BROOKHAVEN: Booster commissioned

    Energy Technology Data Exchange (ETDEWEB)

    Bleser, Ed

    1992-03-15

    The construction and first commissioning phase of the Booster synchrotron to inject into Brookhaven's veteran Alternating Gradient Synchrotron (AGS) were completed last year. Scheduled to come into operation this year, the new Booster will extend the research capabilities AGS, and with its ability to accelerate partially stripped heavy ions will play an essential role in the chain of accelerators serving the Relativistic Heavy Ion Collider (RHIC)

  12. A Staged Approach to LHC Commissioning

    CERN Document Server

    Lamont, M; Brüning, Oliver Sim; Collier, P; Lauckner, R; Schmidt, R

    2006-01-01

    Effective commissioning of the LHC with beam will demand very good preparation; all concerned subsystems will need to be well-prepared and thoroughly tested before first beam. To clarify the demands on the systems involved the objectives of the commissioning phases are presented, along with a breakdown of the phases and the essential prerequisites for each. The nature of the interdependencies between the various systems is highlighted; in particular the need for a well-planned commissioning of the machine protection system.

  13. Views of NHS commissioners on commissioning support provision. Evidence from a qualitative study examining the early development of clinical commissioning groups in England.

    Science.gov (United States)

    Petsoulas, Christina; Allen, Pauline; Checkland, Kath; Coleman, Anna; Segar, Julia; Peckham, Stephen; Mcdermott, Imelda

    2014-10-15

    The 2010 healthcare reform in England introduced primary care-led commissioning in the National Health Service (NHS) by establishing clinical commissioning groups (CCGs). A key factor for the success of the reform is the provision of excellent commissioning support services to CCGs. The Government's aim is to create a vibrant market of competing providers of such services (from both for-profit and not-for-profit sectors). Until this market develops, however, commissioning support units (CSUs) have been created from which CCGs are buying commissioning support functions. This study explored the attitudes of CCGs towards outsourcing commissioning support functions during the initial stage of the reform. The research took place between September 2011 and June 2012. We used a case study research design in eight CCGs, conducting in-depth interviews, observation of meetings and analysis of policy documents. We conducted 96 interviews and observed 146 meetings (a total of approximately 439 h). Many CCGs were reluctant to outsource core commissioning support functions (such as contracting) for fear of losing local knowledge and trusted relationships. Others were disappointed by the absence of choice and saw CSUs as monopolies and a recreation of the abolished PCTs. Many expressed doubts about the expectation that outsourcing of commissioning support functions will result in lower administrative costs. Given the nature of healthcare commissioning, outsourcing vital commissioning support functions may not be the preferred option of CCGs. Considerations of high transaction costs, and the risk of fragmentation of services and loss of trusted relationships involved in short-term contracting, may lead most CCGs to decide to form long-term partnerships with commissioning support suppliers in the future. This option, however, limits competition by creating 'network closure' and calls into question the Government's intention to create a vibrant market of commissioning support

  14. Review and evaluation of the Nuclear Regulatory Commission Safety Research Program for Fiscal Years 1984 and 1985

    International Nuclear Information System (INIS)

    1983-02-01

    This is the sixth report by the Advisory Committee on Reactor Safeguards (ACRS) that has been prepared in response to the Congressional requirement for an annual report on the Nuclear Regulatory Commission (NRC) Reactor Safety Research Program. Part I is a compilation of our general comments and recommendations regarding the NRC Safety Research Program, and includes budget recommendations and an identification of matters of special importance that deserve increased emphasis. It is intended to serve as an Executive Summary. Part II is divided into ten chapters, each of which represents a Decision Unit of the NRC research program. In each chapter, specific comments are included on the research involved in the Decision Unit, an assessment of priorities, and recommendations regarding new directions and levels of funding

  15. A brief review of some pathology research supported by the Georgia Commodity Commission for Pecans at the USDA-ARS, Byron

    Science.gov (United States)

    With the changes currently taking place nationally in the pecan industry, and the production issues faced specifically by growers in Georgia and elsewhere in the southeastern region, the pathology research projects funded by the Georgia Commodity Commission for Pecans (CC) are reviewed. The results ...

  16. 76 FR 24383 - Commission's Rules of Practice, Procedure, and Organization

    Science.gov (United States)

    2011-05-02

    ... FEDERAL COMMUNICATIONS COMMISSION 47 CFR Parts 0 and 1 [GC Docket No. 10-44; FCC 11-16] Commission... docket management measures, such as broadening the use of docketed proceedings; expanding the requirement... effective date for FCC rules in the event the Commission does not specify an effective date in a rulemaking...

  17. Community Research Contributing to Effective Risk Governance

    Energy Technology Data Exchange (ETDEWEB)

    Kelly, Neale; Forsstroem, Hans [European Commission, Brussels (Belgium). DG Research

    2001-07-01

    Research in the field of risk assessment and management has had a prominent role in the Commission's nuclear research programme, especially in the area of radiation protection. In the 1980s, the research had a largely technical focus. Through the 1990s, this focus shifted and greater attention was given to broader, less technical, issues, in particular those concerned with risk perception and communication, risk governance and the role of public participation in the process. This trend will continue within the Commission's 6th Framework Programme (FP6) given the increasing recognition of the importance of these broader socio-economic issues for decision making related to both nuclear and other technologies. The paper summarises the main outcomes of Commission sponsored research in the above areas, how this has influenced research currently being carried out in the Sth Framework Programme (FP5) and that being considered for inclusion in FP6. Two aspects are given particular attention: firstly, research into risk governance (both in the nuclear field in general and the waste management area in particular), especially the importance of social trust and participation of all relevant stakeholders in terms of achieving efficient and acceptable decisions when addressing complex, contentious issues; secondly, research into the social and psychological factors that influenced the efficacy and acceptance of measures taken to mitigate the long term impact of areas in the Former Soviet Union contaminated as a result of the Chernobyl accident. There are important lessons here for the management of any future accident that may affect Europe, especially the need for those affected locally to have a role in the decision process and to be able to exercise at least partial control over their own welfare. While this research was largely carried out in a 'nuclear' context, its findings are more generally applicable.

  18. Community Research Contributing to Effective Risk Governance

    International Nuclear Information System (INIS)

    Kelly, Neale; Forsstroem, Hans

    2001-01-01

    Research in the field of risk assessment and management has had a prominent role in the Commission's nuclear research programme, especially in the area of radiation protection. In the 1980s, the research had a largely technical focus. Through the 1990s, this focus shifted and greater attention was given to broader, less technical, issues, in particular those concerned with risk perception and communication, risk governance and the role of public participation in the process. This trend will continue within the Commission's 6th Framework Programme (FP6) given the increasing recognition of the importance of these broader socio-economic issues for decision making related to both nuclear and other technologies. The paper summarises the main outcomes of Commission sponsored research in the above areas, how this has influenced research currently being carried out in the Sth Framework Programme (FP5) and that being considered for inclusion in FP6. Two aspects are given particular attention: firstly, research into risk governance (both in the nuclear field in general and the waste management area in particular), especially the importance of social trust and participation of all relevant stakeholders in terms of achieving efficient and acceptable decisions when addressing complex, contentious issues; secondly, research into the social and psychological factors that influenced the efficacy and acceptance of measures taken to mitigate the long term impact of areas in the Former Soviet Union contaminated as a result of the Chernobyl accident. There are important lessons here for the management of any future accident that may affect Europe, especially the need for those affected locally to have a role in the decision process and to be able to exercise at least partial control over their own welfare. While this research was largely carried out in a 'nuclear' context, its findings are more generally applicable

  19. The structure of state utility commissions and protection of the captive ratepayer: Is there a connection? Occasional paper {number_sign}23

    Energy Technology Data Exchange (ETDEWEB)

    Zearfoss, N.N.

    1998-06-01

    While there is a considerable body of literature on regulatory decision making, the dominant theories have emphasized the influence of external factors on commissioners, which largely result in capture. Underlying these theories is the assumption that resources translate into influence. The theory proposed in this research is that while resources are necessary in order to influence commission decisions, they are not sufficient. Instead, their effects are mediated by two conditions: one, the structural characteristics of each state commission, which enable it to acquire and analyze information and two, the attributes of the type of consumer safeguards, e.g. a rate freeze or quality-of-service standards with attached financial penalties, which commissions could have adopted. The guiding research hypothesis is that the greater the ability of the commission to acquire and analyze information, the more likely it is to enact more stringent measures to protect the captive ratepayer. The major implications of this research are two. (1) This research suggests that commissions react not just to political pressure and economic incentives, but also to information. Indeed, this research asserts that information is a significant determinant in the decision making process. (2) Where the general public has neither the knowledge nor the understanding to take a position with regard to an issue, a regulatory commission with greater resources and more professional personnel is more likely to be its champion than is a commission with fewer resources and less professional personnel.

  20. Startup and commissioning of pressurized water reactors

    International Nuclear Information System (INIS)

    Albert, L.J.; Gilbert, C.F.

    1983-05-01

    A critical phase of plant development is the test, startup, and commissioning period. The effort expended prior to commissioning has a definite effect on the reliability and continuing availability of the plant during its life. This paper describes a test, startup, and commissioning program for a pressurized water reactor (PWR) plant. This program commences with the completion of construction and continues through the turnover of equipment/systems to the owner's startup/ commissioning group. The paper addresses the organization of the test/startup group, planning and scheduling, test procedures and initial testing, staffing and certification of the test group, training of operators, and turnover to the owner

  1. TH-AB-201-10: Portal Dosimetry with Elekta IViewDose:Performance of the Simplified Commissioning Approach Versus Full Commissioning

    Energy Technology Data Exchange (ETDEWEB)

    Kydonieos, M; Folgueras, A; Florescu, L; Cybulski, T; Marinos, N; Thompson, G; Sayeed, A [Elekta Limited, Crawley, West Sussex (United Kingdom); Rozendaal, R; Olaciregui-Ruiz, I [Netherlands Cancer Institute - Antoni van Leeuwenhoek, Amsterdam, Noord-Holland (Netherlands); Subiel, A; Patallo, I Silvestre [National Physical Laboratory, London (United Kingdom)

    2016-06-15

    Purpose: Elekta recently developed a solution for in-vivo EPID dosimetry (iViewDose, Elekta AB, Stockholm, Sweden) in conjunction with the Netherlands Cancer Institute (NKI). This uses a simplified commissioning approach via Template Commissioning Models (TCMs), consisting of a subset of linac-independent pre-defined parameters. This work compares the performance of iViewDose using a TCM commissioning approach with that corresponding to full commissioning. Additionally, the dose reconstruction based on the simplified commissioning approach is validated via independent dose measurements. Methods: Measurements were performed at the NKI on a VersaHD™ (Elekta AB, Stockholm, Sweden). Treatment plans were generated with Pinnacle 9.8 (Philips Medical Systems, Eindhoven, The Netherlands). A farmer chamber dose measurement and two EPID images were used to create a linac-specific commissioning model based on a TCM. A complete set of commissioning measurements was collected and a full commissioning model was created.The performance of iViewDose based on the two commissioning approaches was compared via a series of set-to-work tests in a slab phantom. In these tests, iViewDose reconstructs and compares EPID to TPS dose for square fields, IMRT and VMAT plans via global gamma analysis and isocentre dose difference. A clinical VMAT plan was delivered to a homogeneous Octavius 4D phantom (PTW, Freiburg, Germany). Dose was measured with the Octavius 1500 array and VeriSoft software was used for 3D dose reconstruction. EPID images were acquired. TCM-based iViewDose and 3D Octavius dose distributions were compared against the TPS. Results: For both the TCM-based and the full commissioning approaches, the pass rate, mean γ and dose difference were >97%, <0.5 and <2.5%, respectively. Equivalent gamma analysis results were obtained for iViewDose (TCM approach) and Octavius for a VMAT plan. Conclusion: iViewDose produces similar results with the simplified and full commissioning

  2. 78 FR 78352 - Orlando Utilities Commission; Notice of Filing

    Science.gov (United States)

    2013-12-26

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. NJ14-4-000] Orlando Utilities Commission; Notice of Filing Take notice that on December 18, 2013, Orlando Utilities Commission submitted its tariff filing per 35.28(e): Order No. 1000 Further Regional Compliance Filing to be effective...

  3. 76 FR 7853 - Patient Safety Organizations: Voluntary Delisting From Oregon Patient Safety Commission

    Science.gov (United States)

    2011-02-11

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Agency for Healthcare Research and Quality Patient Safety Organizations: Voluntary Delisting From Oregon Patient Safety Commission AGENCY: Agency for Healthcare Research and Quality (AHRQ), HHS. ACTION: Notice of delisting. SUMMARY: Oregon Patient Safety Commission: AHRQ...

  4. Nine centuries waiting: The experiences of Iranians surrogacy commissioning mothers

    OpenAIRE

    Zandi, Mitra; Vanaki, Zohreh; Shiva, Marziyeh; Mohammadi, Eesa

    2014-01-01

    Background: There are a few studies about commissioning mothers’ understanding from the surrogacy during 9 months of waiting for delivery in Iran and other countries. This study was conducted with an aim to explore and explain the nature of concerns (experiences) of commissioning mothers. Materials and Methods: A qualitative design with a conventional content analysis approach was used to gather and analyze the experiences of commissioning mothers. They were selected from Royan Research Centr...

  5. 76 FR 25685 - Orlando Utilities Commission; Notice of Filing

    Science.gov (United States)

    2011-05-05

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. NJ11-12-000] Orlando Utilities Commission; Notice of Filing Take notice that on April 15, 2011, Orlando Utilities Commission submitted its tariff filing per 35.25(e): Order 890 compliance to be effective 4/15/2011. Any person...

  6. 76 FR 35209 - Orlando Utilities Commission; Notice of Filing

    Science.gov (United States)

    2011-06-16

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. NJ11-12-001] Orlando Utilities Commission; Notice of Filing Take notice that on May 26, 2011, Orlando Utilities Commission submitted its tariff filing per 35.17(b): Amendment to Compliance Filing to be effective 4/15/2011. Any...

  7. PRA research and the development of risk-informed regulation at the U.S. nuclear regulatory commission

    International Nuclear Information System (INIS)

    Siu, Nathan; Collins, Dorothy

    2008-01-01

    Over the years, Probabilistic Risk Assessment (PRA) research activities conducted at the U.S. Nuclear Regulatory Commission (NRC) have played an essential role in support of the agency's move towards risk-informed regulation. These research activities have provided the technical basis for NRC's regulatory activities in key areas; provided PRA methods, tools, and data enabling the agency to meet future challenges; supported the implementation of NRC's 1995 PRA Policy Statement by assessing key sources of risk; and supported the development of necessary technical and human resources supporting NRC's risk-informed activities. PRA research aimed at improving the NRC's understanding of risk can positively affect the agency's regulatory activities, as evidenced by three case studies involving research on fire PRA, Human Reliability Analysis (HRA), and Pressurized Thermal Shock (PTS) PRA. These case studies also show that such research can take a considerable amount of time, and that the incorporation of research results into regulatory practice can take even longer. The need for sustained effort and appropriate lead time is an important consideration in the development of a PRA research program aimed at helping the agency address key sources of risk for current and potential future facilities

  8. Danish Atomic Energy Commission 1974/75

    International Nuclear Information System (INIS)

    1975-11-01

    Activities of the Danish Atomic Energy Commission and the Risoe eesearch Establishment for the period April1, 1974 to March 31, 1975 are summarized. The operations of the various facilities at the Research Establishment are revised. Operating staff levels and financial data are tabulated, a selected list of staff publications is given, and the design data on research facilities are presented. (B.P.)

  9. Optimization of the commissioning period of nuclear power plant

    International Nuclear Information System (INIS)

    Hou Ganglian; Li Chunyue

    2014-01-01

    Due to current equipment manufacture capacity, construction experience and other factors, commissioning of nuclear power projects was used to be postponed, which could lead to delay of the whole project. Based on the actual situation, optimization of commissioning period and its logic could be an effective way to improve this situation to some extent. Based on previous practice and experience in the schedule management for the commissioning nuclear power projects, this paper analyzes and discusses the characteristics of make commissioning plan and the difficulties of program implementation and strategies of commissioning plan optimization, discusses and presents ways of dynamic plan adjustment and optimization at the vision of entire project, synthesizes the methods of time management through commissioning itself, interface and management, expounds measures for the timing and optimization of commissioning schedule and commissioning period, and sums up the ways of optimization of commissioning period, improving management capabilities and control of optimization principles. (authors)

  10. Commission of the European Communities - Review of fast reactor activities, March 1979

    International Nuclear Information System (INIS)

    Balz, W.

    1979-01-01

    The Commission of the European Communities pursued its activities on the lines described earlier. Besides the execution of a research programme in its Joint Research Centre the Commission endeavoured to support the development and demonstration of fast reactors. Most of the latter activities were performed in the frame of the Fast Reactor Coordinating Committee

  11. Commission administration. National Low-Level Radioactive Waste Management Program

    International Nuclear Information System (INIS)

    1984-09-01

    This report is one in a series of commission option documents prepared for the US Department of Energy, designed to assist regional low-level waste compact commissions in their organization, administration and efforts to effectively manage waste within their regions. In particular, this report addresses topics related to commission administrative procedures, personnel, procurement and finance

  12. Commission on Legal Matters

    CERN Multimedia

    Staff Association

    2016-01-01

    What is a commission within the Staff Association (SA)? A commission is a working group of the CERN Staff Council, led by a staff representative. The commission is composed mainly of staff representatives, but interested members of the SA can apply to participate in the work of a commission. What is the commission on legal matters? The commission on legal matters works on texts governing the employment conditions of staff (Employed Members of Personnel and Associated Members of Personnel). This covers legal documents such as the Staff Rules and Regulations, administrative and operational circulars, as well as any other document relating to employment conditions. How is the work organised in this commission? The revision process of the text is generally done along following lines: The HR department, and its legal experts, proposes new texts or modifications to existing texts. A schedule for the study of these texts is established each year and this calendar by the commission to plan its work. The new or modi...

  13. Commissioning MMS

    Science.gov (United States)

    Wood, Paul; Gramling, Cheryl; Stone, John; Smith, Patrick; Reiter, Jenifer

    2016-01-01

    This paper discusses commissioning of NASAs Magnetospheric MultiScale (MMS) Mission. The mission includes four identical spacecraft with a large, complex set of instrumentation. The planning for and execution of commissioning for this mission is described. The paper concludes by discussing lessons learned.

  14. Compressor Load Stand: Commissioning and Control Strategies

    National Research Council Canada - National Science Library

    Causey, Andrew

    1998-01-01

    .... The purpose of this research project was to commission this load stand, which includes setting up the hardware, setting up a control system, a data acquisition system, and an automatic test sequence system...

  15. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1996-04-01

    This report includes the issuances received during the April 1996 reporting period from the Commission, the Atomic Safety and Licensing Boards, the Administrative Law Judges, the Directors' Decisions, and the Decisions on Petitions for Rulemaking. Included are issuances pertaining to: (1) Yankee Nuclear Power Station, (2) Georgia Tech Research Reactor, (3) River Bend Station, (4) Millstone Unit 1, (5) Thermo-Lag fire barrier material, and (6) Louisiana Energy Services

  16. Nuclear Regulatory Commission issuances

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-01

    This report includes the issuances received during the April 1996 reporting period from the Commission, the Atomic Safety and Licensing Boards, the Administrative Law Judges, the Directors` Decisions, and the Decisions on Petitions for Rulemaking. Included are issuances pertaining to: (1) Yankee Nuclear Power Station, (2) Georgia Tech Research Reactor, (3) River Bend Station, (4) Millstone Unit 1, (5) Thermo-Lag fire barrier material, and (6) Louisiana Energy Services.

  17. Audit of the Federal Energy Regulatory Commission`s Office of Chief Accountant

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-07

    The Federal Energy Regulatory Commission`s (Commission) mission is to oversee America`s natural gas and oil pipeline transportation, electric utility, and hydroelectric power industries to ensure that consumers receive adequate energy supplies at just and reasonable rates. To carry out this mission, the Commission issues regulations covering the accounting, reporting, and rate-making requirements of the regulated utility companies. The Commission`s Office of Chief Accountant performs financial related audits at companies to ensure compliance with these regulations. The purpose of this audit was to evaluate the office of Chief Accountant`s audit performance. Specifically, the objectives were to determine if the most appropriate audit approach was used and if a quality assurance process was in place to ensure reports were accurate and supported by the working papers.

  18. Division B Commission 40: Radio Astronomy

    NARCIS (Netherlands)

    Chapman, Jessica M.; Giovaninni, Gabriele; Taylor, Russell; Carilli, Christopher; Hills, Richard; Hirabayashi, Hisashi; Jonas, Justin L.; Lazio, Joseph; Morganti, Raffaella; Nan, Rendong; Rubio, Monica; Shastri, Prjaval; Kellermann, Ken; Ekers, Ronald; Ohishi, Masatoshi

    2016-01-01

    IAU Commission 40 for Radio Astronomy (hereafter C40) brought together scientists and engineers who carry out observational and theoretical research in radio astronomy and who develop and operate the ground and space-based radio astronomy facilities and instrumentation. As of June 2015, the

  19. 76 FR 71449 - Reporting Line for the Commission's Ethics Counsel

    Science.gov (United States)

    2011-11-18

    ... Ethics Counsel AGENCY: Securities and Exchange Commission. ACTION: Final rule. SUMMARY: The Securities... of the Ethics Counsel is now a stand-alone Office of the Commission and that the head of the Office, the Ethics Counsel, reports directly to the Chairman of the Commission. DATES: Effective Date...

  20. Status report on research programmes of the Commission of European Communities related to risk evaluation of geological disposal of radioactive waste

    International Nuclear Information System (INIS)

    Girardi, F.

    1977-01-01

    The programmes of the Commission of European Communities related to risk evaluation of geological disposal of radioactive waste are presented. The Joint Research Centre carries out theoretical modelling activities and a few selected experimental activities which are related to model development and verification. A set of contractual research activities, coordinated by the General Directorate of Research, Scientific Affairs and Education and set up primarily to encourage development of optimised waste management strategies will provide the many additional experimental data which are necessary for a realistic evaluation of long term hazard to man and the environment

  1. Philippine Atomic Energy Commission: Annual report 1983

    International Nuclear Information System (INIS)

    1984-01-01

    This publication gives the highlights of the research and development projects of the Philippine Atomic Energy Commission in agriculture and food, nuclear fuels and power system technology, medicine, public health and nutrition, environmental surveillance, supportive basic research, social response to nuclear technology, nuclear licensing and safeguards, supportive technology and international and local linkages including manpower development. (ELC)

  2. Curriculum for Commissioning Energy Efficient Buildings

    Energy Technology Data Exchange (ETDEWEB)

    Webster, Lia [Portland Energy Conservation, Inc., OR (United States)

    2012-12-27

    In July 2010, the U.S. Department of Energy (DOE) awarded funding to PECI to develop training curriculum in commercial energy auditing and building commissioning. This program was created in response to the high demand for auditing and commissioning services in the U.S. commercial buildings market and to bridge gaps and barriers in existing training programs. Obstacles addressed included: lack of focus on entry level candidates; prohibitive cost and time required for training; lack of hands-on training; trainings that focus on certifications & process overviews; and lack of comprehensive training. PECI organized several other industry players to create a co-funded project sponsored by DOE, PECI, New York State Energy and Research Development Authority (NYSERDA), California Energy Commission (CEC), Northwest Energy Efficiency Alliance (NEEA) and California Commissioning Collaborative (CCC). After awarded, PECI teamed with another DOE awardee, New Jersey Institute of Technology (NJIT), to work collaboratively to create one comprehensive program featuring two training tracks. NJIT’s Center for Building Knowledge is a research and training institute affiliated with the College of Architecture and Design, and provided e-learning and video enhancements. This project designed and developed two training programs with a comprehensive, energy-focused curriculum to prepare new entrants to become energy auditors or commissioning authorities (CxAs). The following are the key elements of the developed trainings, which is depicted graphically in Figure 1: • Online classes are self-paced, and can be completed anywhere, any time • Commissioning Authority track includes 3 online modules made up of 24 courses delivered in 104 individual lessons, followed by a 40 hour hands-on lab. Total time required is between 75 and 100 hours, depending on the pace of the independent learner. • Energy Auditor track includes 3 online modules made up of 18 courses delivered in 72 individual

  3. From franchise to state commission: Regulation of the electric utility industry, 1907 to 1932

    Science.gov (United States)

    Reutter, Keith Alan

    1997-09-01

    Empirical research into the effects of regulation on industry has been around since the early 1960s. Over the last thirty plus years a number of interesting results have been brought to the fore. For instance, it has been found that regulation of the trucking industry limits entry and increases prices. A similar result has been pointed to in other industries such as commercial airlines and banking. The effect of the state commission form of regulation on the electric utility industry has been less conclusive. State commissions became dominant during the period 1910-1930, replacing local franchising as a method of regulating the electric utility industry. Two competing theories suggest why this transformation took place, the "capture" and "public interest" theories of regulation. The capture theory of regulation suggests that the electric utility industry demanded state regulation as a way to earn above normal profits and reduce competition. The public interest theory suggests the purpose of regulation by state commissions was to benefit the general public by forcing the industry to be competitive. Few studies have tried to determine which theory more aptly describes the actual events that took place. The empirical model developed in Chapter V, is an extension of the current literature. A set of simultaneous equations describing the natural gas and electricity markets is estimated using cross-sectional time-series data from 1907 to 1932. The effect of regulation on the electric utility industry is modeled with a dummy variable taking on a value of one to designate that a state commission had been established. The results suggest the capture theory of regulation best describes the period under study. The empirical estimates indicate that state commissions (1) reduced the rate at which the real price of electricity was falling, (2) had a negative impact on firms entering the industry, (3) had a positive influence on the cost of producing a kwh of electricity, and (4

  4. 78 FR 4366 - Appeal Proceedings Before the Commission

    Science.gov (United States)

    2013-01-22

    ... significant adverse effect on competition, employment, investment, productivity, innovation, or the ability of... assessment is not required. Civil Justice Reform In accordance with Executive Order 12988, the Commission has...(a) and 3(b)(2) of the Order. National Environmental Policy Act The Commission has determined that...

  5. Monitoring and analysis of technology transfer and intellectual property regimes and their use results of a study carried out on behalf of the European Commission (DG Research)

    CERN Document Server

    Van Eecke, Patrick; Bolger, P; Truyens, M

    2008-01-01

    This report presents the results of a three-year study commissioned by the European Commission (DG Research) regarding the monitoring, analysis and use of technology transfer and intellectual property regimes in the European Union. This study was organised in the context of the 6th Framework Programme for R&D, and was jointly carried out by law firms Mason Hayes+Curran (Dublin) and DLA Piper (Brussels).

  6. Commissioning (Phases 4, 4A, 4B)

    National Research Council Canada - National Science Library

    Schofield, Andrew

    1997-01-01

    Phase 4 marked the completion of ANS&A's commitments under the BAA, as the new large centrifuge at the Waterways Experiment Station was commissioned and a series of research experiments were undertaken to demonstrate the breadth of new...

  7. 75 FR 11166 - Joint Meeting of the Nuclear Regulatory Commission and the Federal Energy Regulatory Commission...

    Science.gov (United States)

    2010-03-10

    ... the Nuclear Regulatory Commission and the Federal Energy Regulatory Commission; Notice of Joint Meeting of the Nuclear Regulatory Commission and the Federal Energy Regulatory Commission March 2, 2010. The Federal Energy Regulatory Commission (FERC) and the Nuclear Regulatory Commission (NRC) will hold...

  8. Is woodfuel a strategic issue for the Forestry Commission?

    International Nuclear Information System (INIS)

    Simpson, James

    2000-01-01

    The chapter allows us to answer the question: Is wood fuel a strategic issue for the Forestry Commission? The key points are that: Wood fuel is a strategic issue for the Forestry Commission; Wood fuel is a forest product which can be obtained from both short and long rotation woodlands. Although demand at an industrial scale is relatively low at present there appear to be good prospects for an increase in the near future; The silvicultural systems and forest operations which are employed in the production of wood fuel must be compatible with the UK Forestry Standard and must take account of economic, environmental and social sustainability; The Forestry Commission, as the lead department in GB forestry matters, uses a range of mechanisms in the promotion of sustainable forest management. Many of these are directly applicable to the production of wood fuel; The Forestry Commission's approach to funding research on silvicultural systems and forest operations is based on the identification and removal of barriers which appear to be standing in the way of sustainable forest management. The wood fuel industry could be far more significant to forest management than it is today and this has implications for our research programme. (Author)

  9. 76 FR 21369 - Public Meeting of the Presidential Commission for the Study of Bioethical Issues

    Science.gov (United States)

    2011-04-15

    ... technological advances; examine diverse perspectives and possibilities for useful international collaboration on... emerging research in biomedicine and related areas of science and technology. The Commission is charged to... research, healthcare delivery, and technological innovation. In undertaking these duties, the Commission...

  10. Commissioning an Engineering Scale Coal Gasifier

    Energy Technology Data Exchange (ETDEWEB)

    Reid, Douglas J.; Bearden, Mark D.; Cabe, James E.

    2010-07-01

    This report explains the development, commissioning, and testing of an engineering scale slagging coal gasifier at PNNL. The initial objective of this project was to commission the gasifier with zero safety incidents. The commissioning work was primarily an empirical study that required an engineering design approach. After bringing the gasifier on-line, tests were conducted to assess the impact of various operating parameters on the synthesis gas (syngas) product composition. The long-term intent of this project is to produce syngas product for use by internal Pacific Northwest National Laboratory (PNNL) researchers in catalyst, materials, and instrumentation development. Future work on the project will focus on improving the reliability and performance of the gasifier, with a goal of continuous operation for greater than 4 hours using coal feedstock. In addition, alternate designs that allow for increased flexibility regarding the fuel sources that can be used for syngas production is desired. Continued modifications to the fuel feed system will be pursued to address these goals. Alternative feed mechanisms such as a coal/methanol slurry are being considered.

  11. Guidelines for residential commissioning

    Energy Technology Data Exchange (ETDEWEB)

    Wray, Craig P.; Walker, Iain S.; Sherman, Max H.

    2003-01-31

    Currently, houses do not perform optimally or even as many codes and forecasts predict, largely because they are field assembled and there is no consistent process to identify problems or to correct them. Residential commissioning is a solution to this problem. This guide is the culmination of a 30-month project that began in September 1999. The ultimate objective of the project is to increase the number of houses that undergo commissioning, which will improve the quality, comfort, and safety of homes for California citizens. The project goal is to lay the groundwork for a residential commissioning industry in California focused on end-use energy and non-energy issues. As such, we intend this guide to be a beginning and not an end. Our intent is that the guide will lead to the programmatic integration of commissioning with other building industry processes, which in turn will provide more value to a single site visit for people such as home energy auditors and raters, home inspectors, and building performance contractors. Project work to support the development of this guide includes: a literature review and annotated bibliography, which facilitates access to 469 documents related to residential commissioning published over the past 20 years (Wray et al. 2000), an analysis of the potential benefits one can realistically expect from commissioning new and existing California houses (Matson et al. 2002), and an assessment of 107 diagnostic tools for evaluating residential commissioning metrics (Wray et al. 2002). In this guide, we describe the issues that non-experts should consider in developing a commissioning program to achieve the benefits we have identified. We do this by providing specific recommendations about: how to structure the commissioning process, which diagnostics to use, and how to use them to commission new and existing houses. Using examples, we also demonstrate the potential benefits of applying the recommended whole-house commissioning approach to

  12. Introductory user's manual for the US Nuclear Regulatory Commission Reactor Safety Research Data Bank

    International Nuclear Information System (INIS)

    Scofield, N.R.; Hardy, H.A.; Laats, E.T.

    1983-02-01

    The United States Nuclear Regulatory Commission (NRC) has established the NRC/Division of Accident Evaluation (DAE) Data Bank Program to collect, store, and make available data from the many domestic and foreign water safety research programs. Local direction of the program is provided by E G and G Idaho, Inc., prime contractor for the Department of Energy (DOE) at the Idaho National Engineering Laboratory (INEL). The NRC/DAE Data Bank Program provides a central computer storage mechanism and access software for data that is to be used by code development and assessment groups in meeting the code and correlation needs of the nuclear industry. The administrative portion of the program provides data entry, documentation, training, and advisory services to users and the NRC. The NRC/DAE Data Bank and the capabilities of the data access software are described

  13. Scientific management of the commissioning of the Temelin NPP

    International Nuclear Information System (INIS)

    Pazdera, F.; Vasa, I.; Svoboda, C.

    2002-01-01

    A Scientific Supervisory Group (SSG) for the commissioning of the Temelin nuclear power plant was set up by the statutory body of CEZ, a.s. (utility which holds responsibility for the start-up of the plant pursuant to Act No. 18/1997). The SSG provides support to the operator through expertise in nuclear safety assurance and nuclear power plant commissioning. Nuclear Research Institute Rez plc was appointed to this function. The article gives the definition and explains the statute of the SSG, highlights its main tasks and responsibilities, and presents the main results of activities of the SSG. The mission of the International Scientific Council for the Commissioning of the Temelin NPP is also briefly outlined. (author)

  14. Genetic testing in the epilepsies—Report of the ILAE Genetics Commission

    OpenAIRE

    Ottman, Ruth; Hirose, Shinichi; Jain, Satish; Lerche, Holger; Lopes-Cendes, Iscia; Noebels, Jeffrey L.; Serratosa, José; Zara, Federico; Scheffer, Ingrid E.

    2010-01-01

    In this report, the International League Against Epilepsy (ILAE) Genetics Commission discusses essential issues to be considered with regard to clinical genetic testing in the epilepsies. Genetic research on the epilepsies has led to the identification of more than 20 genes with a major effect on susceptibility to idiopathic epilepsies. The most important potential clinical application of these discoveries is genetic testing: the use of genetic information, either to clarify the diagnosis in ...

  15. 78 FR 32295 - Commission Meeting

    Science.gov (United States)

    2013-05-29

    ... SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on... business meeting are contained in the Supplementary Information section of this notice. DATES: June 20...

  16. 77 FR 10599 - Commission Meeting

    Science.gov (United States)

    2012-02-22

    ... SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on... business meeting are contained in the Supplementary Information section of this notice. DATES: March 15...

  17. 78 FR 12412 - Commission Meeting

    Science.gov (United States)

    2013-02-22

    ... SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on... business meeting are contained in the Supplementary Information section of this notice. DATES: March 21...

  18. 78 FR 52601 - Commission Meeting

    Science.gov (United States)

    2013-08-23

    ... SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on... meeting are contained in the Supplementary Information section of this notice. DATES: September 19, 2013...

  19. 77 FR 70204 - Commission Meeting

    Science.gov (United States)

    2012-11-23

    ... SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on... meeting are contained in the SUPPLEMENTARY INFORMATION section of this notice. DATES: December 14, 2012...

  20. 78 FR 69517 - Commission Meeting

    Science.gov (United States)

    2013-11-19

    ... SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on... meeting are contained in the Supplementary Information section of this notice. DATES: December 12, 2013...

  1. 77 FR 52106 - Commission Meeting

    Science.gov (United States)

    2012-08-28

    ... SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on... business meeting are contained in the Supplementary Information section of this notice. DATES: September 20...

  2. The Commission on Employment Conditions, an ambitious undertaking !

    CERN Multimedia

    Staff Association

    2010-01-01

    Since the beginning of the year, the Commission on Employment Conditions has had much success in the number and ability of its participants. It has mostly worked on salaries, the only compulsory subject of the 2010 five-yearly review. In the framework of this review, the Commission has analysed the results of the comparison carried out by the OECD (see Echo 104 and 105). Through its research and analysis, the Commission has clearly shown that our salaries are lower than those of the comparators. It is there necessary to adjust the salary grid with a salary catch-up and not an increase. In 20 years, no five-yearly review has ended with a significant catch-up. Today it is essential to inform our colleagues that this subject needs to be dealt with and that measures must be taken to finance it, as is the case for restoring the equilibrium of the Pension Fund and Health Insurance schemes. The Commission has established an argumentation to help our fellow delegates talk about the delicate subject of salary catch-...

  3. The initial criticality and nuclear commissioning test program at HANARO

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Choong-Sung; Seo, Chul-Gyo; Jun, Byung-Jin [Korea Atomic Energy Research Institute, Dukjin-Dong 150, Yusung-Ku, Taejon, 305-353 (Korea, Republic of)

    1995-07-01

    The construction of the Korea Multipurpose Research Reactor - HANARO of 3MW, developed by Korea Atomic Energy Research Institute, was completed at the beginning of this year. The first fuel loading began on February 2 1995, and initial criticality was achieved on February 8, when the core had four 18-element assemblies and thirteen 36-element assemblies. The critical control rod position was 600.8 mm which represents excess reactivity of 0.71 $. Currently the nuclear commissioning test is on going under the zero power range. This paper describes the initial criticality approach of the HANARO, and its nuclear commissioning test program. (author)

  4. History of the Atomic Energy Commission

    International Nuclear Information System (INIS)

    Buck, A.L.

    1983-07-01

    This pamphlet traces the history of the US Atomic Energy Commission's twenty-eight year stewardship of the Nation's nuclear energy program, from the signing of the Atomic Energy Act on August 1, 1946 to the signing of the Energy Reorganization Act on October 11, 1974. The Commission's early concentration on the military atom produced sophisticated nuclear weapons for the Nation's defense and made possible the creation of a fleet of nuclear submarines and surface ships. Extensive research in the nuclear sciences resulted in the widespread application of nuclear technology for scientific, medical and industrial purposes, while the passage of the Atomic Energy Act of 1954 made possible the development of a nuclear industry, and enabled the United States to share the new technology with other nations

  5. History of the Atomic Energy Commission

    International Nuclear Information System (INIS)

    Buck, A.L.

    1982-08-01

    This pamphlet traces the history of the Atomic Energy Commission's twenty-eight year stewardship of the Nation's nuclear energy program, from the signing of the Atomic Energy Act on August 1, 1946, to the signing of the Energy Reorganization Act on October 11, 1974. The Commission's early concentration on the military atom produced sophisticated nuclear weapons for the Nation's defense and made possible the creation of a fleet of nuclear submarines and surface ships. Extensive research in the nuclear sciences resulted in the widespread application of nuclear technology for scientific, medical and industrial purposes, while the passage of the Atomic Energy Act of 1954 made possible the development of a nuclear industry, and enabled the United States to share the new technology with other nations

  6. 77 FR 28420 - Commission Meeting

    Science.gov (United States)

    2012-05-14

    ... SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on... meeting are contained in the Supplementary Information section of this notice. DATES: June 7, 2012, at 9...

  7. Advancing Ethical Neuroscience Research.

    Science.gov (United States)

    Borah, B Rashmi; Strand, Nicolle K; Chillag, Kata L

    2016-12-01

    As neuroscience research advances, researchers, clinicians, and other stakeholders will face a host of ethical challenges. The Presidential Commission for the Study of Bioethical Issues (Bioethics Commission) has published two reports that provide recommendations on how to advance research endeavors ethically. The commission addressed, among other issues, how to prioritize different types of neuroscience research and how to include research participants who have impaired consent capacity. The Bioethics Commission's recommendations provide a foundation for ethical guidelines as neuroscience research advances and progresses. © 2016 American Medical Association. All Rights Reserved.

  8. Commissioning of an Integral Effect Test Loop for SMART

    Energy Technology Data Exchange (ETDEWEB)

    Park, Hyunsik; Bae, Hwang; Kim, Dongeok; Min, Kyoungho; Shin, Yongcheol; Ko, Yungjoo; Yi, Sungjae [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2013-05-15

    An integral-effect test loop for SMART, SMART-ITL (or FESTA), has been constructed at KAERI. Its height was preserved and its flow area and volume were scaled down to 1/49 compared with the prototype plant, SMART. The ratio of the hydraulic diameter is 1/7. The SMART is a 330 MW thermal power reactor, and its core exit temperature and PZR pressure are 323 .deg. C and 15 MPa during a normal working condition, respectively. The maximum power of the core heater in the SMART-ITL is 30% of the scaled full power. As shown in Fig. 1, the SMART-ITL consists of a primary system including a reactor pressure vessel with a pressurizer, four steam generators and four main coolant pumps, a secondary system, a safety system, and an auxiliary system. The SMART-ITL facility will be used to investigate the integral performance of the inter-connected components and possible thermal-hydraulic phenomena occurring in the SMART design, to validate its safety for various design basis events and broad transient scenarios, and to validate the related thermal-hydraulic models of the safety analysis codes. The scenarios include small-break loss-of coolant accident (SBLOCA) scenarios, complete loss of RCS flowrate (CLOF), steam generator tube rupture (SGTR), feedwater line break (FLB), and main steam line break (MSLB). The role of SMART-ITL will be extended to examine and verify the normal, abnormal, and emergency operating procedures required during the construction and export phases of SMART. After an extensive series of commissioning tests in 2012, the SMART-ITL facility is now in operation. In this paper, the major test results acquired during the commissioning tests will be discussed.

  9. Israel Atomic Energy Commission 1996 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-31

    Selecting the research efforts to be highlighted in the Israel Atomic Energy Commission`s Annual Report from the large body and broad spectrum of ongoing work is not an easy task. The extensive bibliography of published results attached to the report attests to the scope of this difficulty. Of the many worthwhile projects, four were chosen to represent best the current trends in the continuing R and D program at the research centers of the Israel Atomic Energy Commission. One of these trends is the growing cooperation with private industry, in an attempt to gear our R and D programs to respond to market demands. Another feature, noted already several years ago, is the extensive collaboration of our scientists and engineers with colleagues at other institutions, in Israel and abroad. some of the work reported is part of evolving international industrial cooperation projects, illustrating both these trends. Following a trend common to many nuclear research centers around the world, a substantial part of our research effort is non-nuclear in nature. This is illustrated in the first article, which deals with advances in the application of non-linear optics in diverse fields of science and technology. These include state-of-the-art solid-state lasers, rapid modulation of light signals, development and generation of tunable sources of coherent light, optical data storage and the microscopic probing of biological and inorganic samples. The present work reports on a range of R and D, from the fundamentals of non-linear optical materials to proof-of-principle demonstrations of non-linear subwavelength resolution microscopy, to fabrication of prototype commercial tunable laser systems The second report considers the microstrain characteristics in some alloys using X-ray diffraction (XRD). The research utilizes XRD line broadening effects to study the characteristics of alloys from especially prepared surfaces. These characteristics include the homogeneity of alloying

  10. Katerynoslav is the scientific archived commission and collections of writing sights

    Directory of Open Access Journals (Sweden)

    K. O. Telezhnyak

    2014-02-01

    The scientific value of Katerynoslav of the scientific archived commission is marked in the article, that was instrumental in forming of a deserving spring base for science with a variety of issues and indicated that collecting as a practice was a creature of his time and contributed to the development of science, education. The scientific archived commissions were semi­official establishments. They executed the functions of local historical societies simultaneously. Collective activity of members of Commission was very fruitful. It influenced on maintenance of unique complexes of writing sources. It is necessary to mark selfless activity each to the member of Commission. People that enter in the complement of Commission became the business connoisseurs. Local researchers gradually from amateurs became professionals. Them active work was instrumental in awakening of the personal interest at local wide public to historical science and native edge.

  11. Commission des Nations Unies sur les produits indispensables aux ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    United Nations Commission on Commodities for Women's and Children's Health. Too often, cost effective, high impact medicines - those that could address critical health problems such as pneumonia, diarrhea, and post-partum hemorrhage - don't reach the women and... View moreUnited Nations Commission on ...

  12. The use of research results for effective aging management

    International Nuclear Information System (INIS)

    Gunther, W.E.; Taylor, J.H.

    1989-01-01

    The study of the degradation of structures, components, and systems due to aging is an important ongoing area of research in the nuclear industry. Efforts by the U.S. Nuclear Regulatory Commission (NRC) and the utility industry, through organizations such as the Electric Power Research Institute (EPRI), have produced substantial research results that can be used by inspectors and operators to effectively understand and manage the aging of nuclear power plants. One of the primary objectives of the NRC's Nuclear Plant Aging Research (NPAR) Program is to determine how aging affects the safety of nuclear power plants. This program uses operating experience, testing, and engineering analysis to identify failures caused by age-related degradation. Useful information on aging has also resulted from research being performed by the industry to support plant-life extension (PLEX). The EPRI program, for instance, is directed toward the resolution of issues related to materials and components. Degradation of equipment and systems due to aging can occur which, if unmitigated, could result in reduction of the nuclear power plant safety margin as the plant ages. This paper describes how aging research results may be used by plant operating management to effectively address the aging issue and by inspectors responsible for monitoring plant activities and programs

  13. Liberalism, authority, and bioethics commissions.

    Science.gov (United States)

    MacDougall, D Robert

    2013-12-01

    Bioethicists working on national ethics commissions frequently think of themselves as advisors to the government, but distance themselves from any claims to actual authority. Governments however may find it beneficial to appear to defer to the authority of these commissions when designing laws and policies, and might appoint such commissions for exactly this reason. Where does the authority for setting laws and policies come from? This question is best answered from within a normative political philosophy. This paper explains the locus of moral authority as understood within one family of normative political theories--liberal political theories--and argues that most major "liberal" commentators have understood both the source and scope of ethics commissions' authority in a manner at odds with liberalism, rightly interpreted. The author argues that reexamining the implications of liberalism for bioethics commissions would mean changing what are considered valid criticisms of such commissions and also changing the content of national bioethics commission mandates. The author concludes that bioethicists who participate in such commissions ought to carefully examine their own views about the normative limits of governmental authority because such limits have important implications for the contribution that bioethicists can legitimately make to government commissions.

  14. Stakeholder assessment of comparative effectiveness research needs for Medicaid populations

    Science.gov (United States)

    Fischer, Michael A; Allen-Coleman, Cora; Farrell, Stephen F; Schneeweiss, Sebastian

    2015-01-01

    Patients, providers and policy-makers rely heavily on comparative effectiveness research (CER) when making complex, real-world medical decisions. In particular, Medicaid providers and policy-makers face unique challenges in decision-making because their program cares for traditionally underserved populations, especially children, pregnant women and people with mental illness. Because these patient populations have generally been underrepresented in research discussions, CER questions for these groups may be understudied. To address this problem, the Agency for Healthcare Research and Quality commissioned our team to work with Medicaid Medical Directors and other stakeholders to identify relevant CER questions. Through an iterative process of topic identification and refinement, we developed relevant, feasible and actionable questions based on issues affecting Medicaid programs nationwide. We describe challenges and limitations and provide recommendations for future stakeholder engagement. PMID:26388438

  15. Methods for Automated and Continuous Commissioning of Building Systems

    Energy Technology Data Exchange (ETDEWEB)

    Larry Luskay; Michael Brambley; Srinivas Katipamula

    2003-04-30

    Avoidance of poorly installed HVAC systems is best accomplished at the close of construction by having a building and its systems put ''through their paces'' with a well conducted commissioning process. This research project focused on developing key components to enable the development of tools that will automatically detect and correct equipment operating problems, thus providing continuous and automatic commissioning of the HVAC systems throughout the life of a facility. A study of pervasive operating problems reveled the following would most benefit from an automated and continuous commissioning process: (1) faulty economizer operation; (2) malfunctioning sensors; (3) malfunctioning valves and dampers, and (4) access to project design data. Methodologies for detecting system operation faults in these areas were developed and validated in ''bare-bones'' forms within standard software such as spreadsheets, databases, statistical or mathematical packages. Demonstrations included flow diagrams and simplified mock-up applications. Techniques to manage data were demonstrated by illustrating how test forms could be populated with original design information and the recommended sequence of operation for equipment systems. Proposed tools would use measured data, design data, and equipment operating parameters to diagnosis system problems. Steps for future research are suggested to help more toward practical application of automated commissioning and its high potential to improve equipment availability, increase occupant comfort, and extend the life of system equipment.

  16. GenHyPEM: A research program on PEM water electrolysis supported by the European Commission

    Energy Technology Data Exchange (ETDEWEB)

    Millet, Pierre; Dragoe, Diana [Institut de Chimie Moleculaire et des Materiaux d' Orsay, UMR CNRS no 8182, Universite Paris-Sud 11, 15 rue Georges Clemenceau, 91405 Orsay Cedex (France); Grigoriev, Serguey; Fateev, Vladimir [Hydrogen Energy and Plasma Technology, Institute of Russian Research Center, Kurchatov Institute, 1, Kurchatov sq., 123182 Moscow (Russian Federation); Etievant, Claude [Compagnie Europeenne des Technologies de l' Hydrogene (CETH), Innov' Valley Entreprise, Batiment D0, Route de Nozay, 91461 Marcoussis Cedex (France)

    2009-06-15

    GenHyPEM (Generateur d'Hydrogene par electrolyse de l'eau PEM <>) is an STREP programme (no 019802) supported by the European Commission in the course of the 6th framework research programme. This R and D project which started in October 2005, is a 2.6 MEUR research effort over three years. It gathers partners from Belgium, Germany, Romania, Federation of Russia, Armenia and France. The main goal of the project is to develop low-cost and high pressure (50 bar) PEM water electrolysers for the production of up to several Nm{sup 3} H{sub 2}/h. The purpose of this communication is to present the current status of GenHyPEM. Major results and technological achievements obtained so far in the fields of academic (electrocatalysis, polymer electrolyte) and applied (stack development and performances) research are presented. Non-noble electrocatalysts have been identified to replace platinum for the HER and stable performances have been obtained during operation at high (1 A cm{sup -2}) current density, paving the way to substantial cost reductions. Prototype electrolysers producing from 0.1 to 5 Nm{sup 3} H{sub 2}/h have been successfully developed. (author)

  17. Commission 4: Ephemerides

    Science.gov (United States)

    Kaplan, George H.; Hohenkerk, Catherine Y.; Fukushima, Toshio; Arlot, Jean-Eudes; Bangert, John A.; Bell, Steven A.; Folkner, William M.; Lara, Martin; Pitjeva, Elena V.; Urban, Sean E.; Vondrák, Jan

    2012-04-01

    The Commission 4 Organizing Committee began its work for the 2009-2012 triennium by revising the commission's terms of reference, which serve as our ``mission statement.'' The new terms of reference are:(a)Maintain cooperation and collaboration between the national offices providing ephemerides, prediction of phenomena, astronomical reference data, and navigational almanacs.(b)Encourage agreement on the bases (reference systems, time scales, models, and constants) of astronomical ephemerides and reference data in the various countries. Promote improvements to the usability and accuracy of astronomical ephemerides, and provide information comparing computational methods, models, and results to ensure the accuracy of data provided.(c)Maintain databases, available on the Internet to the national ephemeris offices and qualified researchers, containing observations of all types on which the ephemerides are based. Promote the continued importance of observations needed to improve the ephemerides, and encourage prompt availability of these observations, especially those from space missions, to the science community.(d)Encourage the development of software and web sites that provide astronomical ephemerides, prediction of phenomena, and astronomical reference data to the scientific community and public.Promote the development of explanatory material that fosters better understanding of the use and bases of ephemerides and related data.

  18. Danish Atomic Energy Commission Annual Report 1 April 1975 - 28 April 1976

    International Nuclear Information System (INIS)

    1976-10-01

    Activities of the Danish Atomic Energy Commission and the Research Establishment Risoe for the period 1 April 1975 - 28 April 1976 are summarized. Financial data are tabulated, and a list of staff publications is given. This is the last report before the dissolution of the Danish Atomic Energy Commission. (B.P.)

  19. Should diabetes be commissioned through multidisciplinary networks, rather than Practice Based Commissioning?

    Science.gov (United States)

    Simmons, David; English, Patrick; Robins, Peter; Craig, Andrew; Addicott, Rachael

    2011-04-01

    Diabetes is recognized as a complex, long term, largely asymptomatic condition requiring self management skills, a range of health care professionals and articulated health services. Diabetes Networks have been introduced to provide guidance from people with diabetes and local health professionals with different skills to ensure that diabetes care is well organized, sustainable and delivers quality care. We have considered the role of Diabetes Networks in the English setting. Drawing on studies of health service organization and health policy, we describe the context in which diabetes commissioning is currently occurring in England, the role of Diabetes Networks and key components for an effective Diabetes Network. We have identified that Diabetes Networks are not currently mandatory and discovered policy approaches that are likely to work against safe, timely, integrated approaches to diabetes services with potentially harmful impacts on people with diabetes in the future. Practice Based Commissioning, where it sidelines Diabetes Networks, is a particular concern. We have identified key components of Diabetes Networks including explicit frameworks for leadership, membership, funding, decision making, communication and action. Diabetes is a condition requiring collaboration between all involved. Diabetes Networks include patients and all relevant health professionals and should dictate what and how diabetes care should be commissioned within the local health economy. Copyright © 2010 Primary Care Diabetes Europe. Published by Elsevier Ltd. All rights reserved.

  20. Research priorities at the European Commission in relation to maintenance optimization and nuclear power plant life management

    International Nuclear Information System (INIS)

    Contri, Paolo

    2009-01-01

    Analysis of experience in many countries operating nuclear power plants (NPPs) suggests that, while differences in long term operation (LTO) programs are mainly related to the various national regulatory processes, the main features and basic technical requirements are similar. The implementation of these however needs reshaping in an integrated plant life management (PLIM) framework, bearing in mind the specific safety implications of LTO. R and D is essential to support this process, not only for long term extrapolation of the component integrity and behaviour, but also for a proper maintenance system and for an adequate management structure ensuring effective management strategies at plant level, able to address organisational issues, spare part management, staff ageing, component obsolescence, etc. This is recognised by the European Commission, which supports R and D in targeted areas in the framework of the EURATOM programme, both by “direct actions” i.e. projects managed and executed by its Directorate General Joint Research Centers (JRC) and by indirect actions i.e. funding of selected projects, managed by the Directorate General Research (RTD). This paper outlines the JRC's priorities in the current 7th Framework Programme in relation to R and D tasks for maintenance and ISI to support the highest safety level at member's NPPs and appropriate decision-making tools for the optimisation of these programs. A newly developed UE model for PLIM, also integrating maintenance optimisation issues, is presented for further discussion. (author)

  1. Commissioning of Temelin NPP as seen by scientific supervisory group

    International Nuclear Information System (INIS)

    Svoboda, C.

    2003-01-01

    Scientific Supervisory Group worked during the Temelin NPP commissioning process as an independent supervisor. The main tasks and main results of its activity are described in this contribution. The characteristic common features of commissioning process and most important events from the Scientific Supervisory Group point of view are presented. In April 1999 the Czech Power Utility with the objective to achieve maximum level of nuclear safety and quality within the NPP Temelin commissioning procedures has established a special body / Scientific Supervisory Group and requested Nuclear Research Institute Rez plc to perform the required function. The Scientific Supervisory Group proceeds in accordance with its Statute and provides an independent specialised professional and expert work focused on nuclear safety assurance, assesment of the selected documentation related to plant preparedness for the individual commissioning stages, and, of course. on assessment of the commissioning tests results. While performing its function the Scientific Supervisory Group is guided by the Atomic Act and the relevant Directives of State Office for Nuclear Safety; its activities are in compliance with the applicable IAEA recommendations (Authors)

  2. Commissioning of accelerator based boron neutron capture therapy system

    International Nuclear Information System (INIS)

    Nakamura, S.; Wakita, A.; Okamoto, H.; Igaki, H.; Itami, J.; Ito, M.; Abe, Y.; Imahori, Y.

    2017-01-01

    Boron neutron capture therapy (BNCT) is a treatment method using a nuclear reaction of 10 B(n, α) 7 Li. BNCT can be deposited the energy to a tumor since the 10 B which has a higher cross-section to a neutron is high is concentrated on the tumor. It is different from conventional radiation therapies that BNCT expects higher treatment effect to radiation resistant tumors since the generated alpha and lithium particles have higher radiological biological effectiveness. In general, BNCT has been performed in research nuclear reactor. Thus, BNCT is not widely applied in a clinical use. According to recent development of accelerator-based boron neutron capture therapy system, the system has an adequate flux of neutrons. Therefore, National Cancer Canter Hospital, Tokyo, Japan is planning to install accelerator based BNCT system. Protons with 2.5 MeV are irradiated to a lithium target system to generate neutrons. As a result, thermal load of the target is 50 kW since current of the protons is 20.0 mA. Additionally, when the accelerator-based BNCT system is installed in a hospital, the facility size is disadvantage in term of neutron measurements. Therefore, the commissioning of the BNCT system is being performed carefully. In this article, we report about the commissioning. (author)

  3. Philippine Atomic Energy Commission: Annual report 1982

    International Nuclear Information System (INIS)

    1983-02-01

    This publication enumerates the research and development activities of the Philippine Atomic Energy Commission with priorities geared towards achieving the economic and social upliftment of the Filipinos in the field of agriculture, energy, industry, health and environment. Highlights are summaries of investigations and studies of great importance in crop improvement, animal production, nuclear fuels, nutrition research, not to mention its supportive technology, technical services, nuclear information and public acceptance, and nuclear manpower development. (RTD)

  4. Commission Conditions d'emploi

    CERN Multimedia

    Staff Association

    2017-01-01

    Au CERN, nous avons la formidable possibilité d’imaginer nos CONDITIONS D’EMPLOIS. Rendez-vous compte ! Nous avons le pouvoir de proposer des idées et de les défendre pour avoir des conditions d’emplois qui soient les plus attractives possibles pour le personnel en place et à venir. ---------------- L’Association du personnel du CERN, tout le monde connait ou en a entendu parler. Ce qui est moins connu, ce sont les diverses commissions internes qui traitent des sujets propres à défendre les intérêts du personnel. Les publications dans notre journal, l’Echo, sont un des moyens à notre disposition pour vous faire découvrir chacune des commissions internes de l’Association du personnel (voir Echo n°242 sur la commission juridique, et Echo n°255 sur la commission des cas particuliers). Commission Conditions d&...

  5. Safe LHC beam commissioning

    International Nuclear Information System (INIS)

    Uythoven, J.; Schmidt, R.

    2007-01-01

    Due to the large amount of energy stored in magnets and beams, safety operation of the LHC is essential. The commissioning of the LHC machine protection system will be an integral part of the general LHC commissioning program. A brief overview of the LHC Machine Protection System will be given, identifying the main components: the Beam Interlock System, the Beam Dumping System, the Collimation System, the Beam Loss Monitoring System and the Quench Protection System. An outline is given of the commissioning strategy of these systems during the different commissioning phases of the LHC: without beam, injection and the different phases with stored beam depending on beam intensity and energy. (author)

  6. Commissioning of NSLS-II

    Energy Technology Data Exchange (ETDEWEB)

    Willeke, F.

    2015-05-03

    NSLS-II, the new 3rd generation light source at BNL was designed for a brightness of 1022 photons s-1mm-2mrad-2 (0.1%BW)-1. It was constructed between 2009 and 2014. The storage ring was commissioned in April 2014 which was followed by insertion device and beamline commissioning in the fall of 2014. All ambitious design parameters of the facility have already been achieved except for commissioning the full beam intensity of 500mA which requires more RF installation. This paper reports on the results of commissioning.

  7. Unit Commissioning of “Belene” NPP (Bulgaria)

    International Nuclear Information System (INIS)

    2009-01-01

    This presentations gives detailed information about the following topics about commissioning: principles of NPP commissioning; phases of NPP commissioning; organization of commissioning activities; duties and responsibilities of the parties for carrying out unit commissioning activities; responsibility and obligations of the sides during commissioning of power unit; documentation required for power unit commissioning; quality assurance for commissioning activities

  8. Uranium recovery research sponsored by the Nuclear Regulatory Commission at Pacific Northwest Laboratory. Annual progress report, May 1982-May 1983

    International Nuclear Information System (INIS)

    Foley, M.G.; Opitz, B.E.; Deutsch, W.J.

    1983-06-01

    Pacific Northwest Laboratory (PNL) is currently conducting research for the US Nuclear Regulatory Commission (NRC) on uranium recovery process wastes for both active and inactive operations. NRC-sponsored uranium recovery research at PNL is focused on NRC regulatory responsibilities for uranium-recovery operations: license active milling and in situ extraction operations; concur on the acceptability of DOE remedial-action plans for inactive sites; and license DOE to maintain inactive sites following remedial actions. PNL's program consists of four coordinated projects comprised of a program management task and nine research tasks that address the critical technical and safety issues for uranium recovery. Specifically, the projects endeavor to find and evaluate methods to: prevent erosion of tailings piles and prevent radon release from tailings piles; evaluate the effectiveness of interim stabilization techniques to prevent wind erosion and transport of dry tailings from active piles; estimate the dewatering and consolidation behavior of slurried tailings to promote early cover placement; design a cover-protection system to prevent erosion of the cover by expected environmental stresses; reduce seepage into ground water and prevent ground-water degradation; control solution movement and reaction with ground water in in-situ extraction operations; evaluate natural and induced restoration of ground water in in-situ extraction operations; and monitor releases to the environment from uranium recovery facilities

  9. Uranium recovery research sponsored by the Nuclear Regulatory Commission at Pacific Northwest Laboratory. Annual progress report, May 1982-May 1983

    Energy Technology Data Exchange (ETDEWEB)

    Foley, M.G.; Opitz, B.E.; Deutsch, W.J.; Peterson, S.R.; Gee, G.W.; Serne, R.J.; Hartley, J.N.; Thomas, V.W.; Kalkwarf, D.R.; Walters, W.H.

    1983-06-01

    Pacific Northwest Laboratory (PNL) is currently conducting research for the US Nuclear Regulatory Commission (NRC) on uranium recovery process wastes for both active and inactive operations. NRC-sponsored uranium recovery research at PNL is focused on NRC regulatory responsibilities for uranium-recovery operations: license active milling and in situ extraction operations; concur on the acceptability of DOE remedial-action plans for inactive sites; and license DOE to maintain inactive sites following remedial actions. PNL's program consists of four coordinated projects comprised of a program management task and nine research tasks that address the critical technical and safety issues for uranium recovery. Specifically, the projects endeavor to find and evaluate methods to: prevent erosion of tailings piles and prevent radon release from tailings piles; evaluate the effectiveness of interim stabilization techniques to prevent wind erosion and transport of dry tailings from active piles; estimate the dewatering and consolidation behavior of slurried tailings to promote early cover placement; design a cover-protection system to prevent erosion of the cover by expected environmental stresses; reduce seepage into ground water and prevent ground-water degradation; control solution movement and reaction with ground water in in-situ extraction operations; evaluate natural and induced restoration of ground water in in-situ extraction operations; and monitor releases to the environment from uranium recovery facilities.

  10. Ghana Atomic Energy Commission : at a glance. 3. ed.

    International Nuclear Information System (INIS)

    1998-07-01

    The brochure provides a brief history of the establishment and functions of the Ghana Atomic Energy Commission. It also provides information on the structure, facilities and activities of existing research institutes and centres

  11. A Public Commissioning Maturity Model for Construction Clients

    NARCIS (Netherlands)

    Hermans, M.H.; Volker, L.; Eisma, P.R.

    2014-01-01

    Being a public organization with construction needs, whether they are housing, building or infrastructure related, implies close co-operation and interaction with the supply chain. Substantial research exists that focuses on project related aspects of commissioning and on the role of the

  12. Study of the Nuclear Regulatory Commission's Appellate System

    International Nuclear Information System (INIS)

    Bickwit, L.; Malsch, M.; Ostrach, S.; Christenson, K.

    1979-12-01

    At the Chairman's request the Office of the General Counsel studied the Commission's appellate system. The study included examination of the development of the study, analysis of the current workload, investigation of the practices of other agencies, and consideration of alternatives to the present system. The study recommends retention of the present system with some limited modifications to enable the Commission to more effectively use its existing appellate powers

  13. Student Dress Codes and Uniforms. Research Brief

    Science.gov (United States)

    Johnston, Howard

    2009-01-01

    According to an Education Commission of the States "Policy Report", research on the effects of dress code and school uniform policies is inconclusive and mixed. Some researchers find positive effects; others claim no effects or only perceived effects. While no state has legislatively mandated the wearing of school uniforms, 28 states and…

  14. Model Commissioning Plan and Guide Specifications

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    The objectives of Model Commissioning Plan and Guide Specifications are to ensure that the design team applies commissioning concepts to the design and prepares commissioning specifications and a commission plan for inclusion in the bid construction documents.

  15. A History of the Atomic Energy Commission

    Science.gov (United States)

    Buck, Alice L.

    1983-07-01

    This pamphlet traces the history of the US Atomic Energy Commission's twenty-eight year stewardship of the Nation's nuclear energy program, from the signing of the Atomic Energy Act on August 1, 1946 to the signing of the Energy Reorganization Act on October 11, 1974. The Commission's early concentration on the military atom produced sophisticated nuclear weapons for the Nation's defense and made possible the creation of a fleet of nuclear submarines and surface ships. Extensive research in the nuclear sciences resulted in the widespread application of nuclear technology for scientific, medical and industrial purposes, while the passage of the Atomic Energy Act of 1954 made possible the development of a nuclear industry, and enabled the United States to share the new technology with other nations.

  16. Nuclear Regulatory Commission information digest

    International Nuclear Information System (INIS)

    1990-03-01

    The Nuclear Regulatory Commission information digest provides summary information regarding the US Nuclear Regulatory Commission, its regulatory responsibilities, and areas licensed by the commission. This is an annual publication for the general use of the NRC Staff and is available to the public. The digest is divided into two parts: the first presents an overview of the US Nuclear Regulatory Commission and the second provides data on NRC commercial nuclear reactor licensees and commercial nuclear power reactors worldwide

  17. A Guide to Building Commissioning

    Energy Technology Data Exchange (ETDEWEB)

    Baechler, Michael C.

    2011-09-01

    Commissioning is the process of verifying that a building's heating, ventilation, and air conditioning (HVAC) and lighting systems perform correctly and efficiently. Without commissioning, system and equipment problems can result in higher than necessary utility bills and unexpected and costly equipment repairs. This report reviews the benefits of commissioning, why it is a requirement for Leadership in Energy and Environmental Design (LEED) certification, and why building codes are gradually adopting commissioning activities into code.

  18. Federal Energy Regulatory Commission`s fiscal year 1996 financial statement audit

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-02-14

    This report presents the results of the independent certified public accountants` audit of the Federal Energy Regulatory Commission`s (FERC) financial statements as of September 30, 1996. The auditors have expressed an unqualified opinion on the 1996 statement of financial position and the related statements of operations and changes in net position.

  19. Report of nuclear utility industry responses to Kemeny Commission recommendations

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1989-02-15

    The purpose of this paper is to provide a report of nuclear utility industry progress in responding to the recommendations of the President's Commission on the Accident at Three Mile Island (The Kemeny Commission). On April 11, 1979, in response to TMI, President Carter established a Commission to conduct '.... a comprehensive study and investigation of the recent accident involving the nuclear power facility on Three Mile Island in Pennsylvania'. The Commission was chaired by Dr. John G. Kemeny, then President of Dartmouth College. (A list of all members of The Kemeny Commission is provided in Attachment to the Appendix ). The report of the commission's findings and recommendations was transmitted to the President in October 1979. During this same period, the nuclear utility industry responded to TMI by creating the Institute of Nuclear Power Operations (INPO) with a mission to promote the highest levels of safety and reliability - to promote excellence - in the operation of nuclear electric generating plants. In addition, the Nuclear Safety Analysis Center (NSAC) was established at the Electric Power Research Institute (EPRI to evaluate the accident and assist in determining the best industry response. In a White House paper (and press release) of December 7 1979, the President announced that he agreed fully with the spirit and intent of al the Kemeny Commission recommendations and requested that the industry and The Nuclear Regulatory Commission (NRC) comply with the recommendations. The President also recognized the industry initiative in establishing INPO and called for several actions involving the Institute; the President directed the Department of Energy and other government agencies to provide assistance to INPO and the industry. An overall status of the nuclear utility industry responses to Kemeny Commission recommendations in the key areas directly related to nuclear plant operations is provided below. A more detailed status of industry responses to the

  20. Report of nuclear utility industry responses to Kemeny Commission recommendations

    International Nuclear Information System (INIS)

    1989-02-01

    The purpose of this paper is to provide a report of nuclear utility industry progress in responding to the recommendations of the President's Commission on the Accident at Three Mile Island (The Kemeny Commission). On April 11, 1979, in response to TMI, President Carter established a Commission to conduct '.... a comprehensive study and investigation of the recent accident involving the nuclear power facility on Three Mile Island in Pennsylvania'. The Commission was chaired by Dr. John G. Kemeny, then President of Dartmouth College. (A list of all members of The Kemeny Commission is provided in Attachment to the Appendix ). The report of the commission's findings and recommendations was transmitted to the President in October 1979. During this same period, the nuclear utility industry responded to TMI by creating the Institute of Nuclear Power Operations (INPO) with a mission to promote the highest levels of safety and reliability - to promote excellence - in the operation of nuclear electric generating plants. In addition, the Nuclear Safety Analysis Center (NSAC) was established at the Electric Power Research Institute (EPRI to evaluate the accident and assist in determining the best industry response. In a White House paper (and press release) of December 7 1979, the President announced that he agreed fully with the spirit and intent of al the Kemeny Commission recommendations and requested that the industry and The Nuclear Regulatory Commission (NRC) comply with the recommendations. The President also recognized the industry initiative in establishing INPO and called for several actions involving the Institute; the President directed the Department of Energy and other government agencies to provide assistance to INPO and the industry. An overall status of the nuclear utility industry responses to Kemeny Commission recommendations in the key areas directly related to nuclear plant operations is provided below. A more detailed status of industry responses to the

  1. 47 CFR 1.1528 - Commission review.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Commission review. 1.1528 Section 1.1528... Commission review. Either the applicant or Bureau counsel may seek Commission review of the initial decision on the application, or the Commission may decide to review the decision on its own initiative, in...

  2. U.S. Department of Energy & Nuclear Regulatory Commission Advanced Fuel Cycle Research & Development Seminar Series FY 2007 & 2008

    Energy Technology Data Exchange (ETDEWEB)

    Grandy, Christopher [Argonne National Lab. (ANL), Argonne, IL (United States)

    2008-08-01

    In fiscal year 2007, the Advanced Burner Reactor project initiated an educational seminar series for the Department of Energy (DOE) and Nuclear Regulatory Commission (NRC) personnel on various aspects of fast reactor fuel cycle closure technologies. This important work was initiated to inform DOE and NRC personnel on initial details of sodium-cooled fast reactor, separations, waste form, and safeguard technologies being considered for the Advanced Fuel Cycle Research and Development program, and to learn the important lesson from the licensing process for the Clinch River Breeder Reactor Plant that educating the NRC staff early in the regulatory process is very important and critical to a project success.

  3. Atomic Energy Commission Act, 1963

    International Nuclear Information System (INIS)

    1963-01-01

    Promulgated in 1963, the Atomic Energy Commission Act (204) established and vested in the Ghana Atomic Energy Commission the sole responsibility for all matters relating to the peaceful uses of atomic energy in the country. Embodied in the Act are provisions relating to the powers, duties, rights and liabilities of the Commission. (EAA)

  4. Law Commissions – What is the essence of their law reform role?

    Directory of Open Access Journals (Sweden)

    Neil Faris

    2014-10-01

    Full Text Available Article by Neil Faris (Solicitor and a former Commissioner at the Northern Ireland Law Commission reflecting on the nature of law reform as carried out by law commissions. This is in the context of the author’s experience in the Northern Ireland Law Commission. The paper assesses the importance of independence in any law reform body and the particular impact which law commissioners may bring to the law reform process. The paper looks at the history of law reform in Northern Ireland leading to the establishment of the Commission with a brief overview of the work of the Commission. The conclusion is that there is a role for effective law reform driven by commissioner led independent law commissions. The author makes a strong case for the need for independent law commissions to promote high quality law reform. His article gives an idea about how law reform works in practice with law commissions providing one route for reforming the law.

  5. Role of the team of scientific and technical commissioning support (TSTCS) during Mochovce NPP unit 3 and 4 commissioning

    International Nuclear Information System (INIS)

    Hermansky, J.; Prachar, M.; Sedlacek, M.; Petenyi, V.

    2011-01-01

    The Team of Scientific and Technical Commissioning Support (TSTCS) shall provide an independent support for the Mochovce NPP 3 and 4 Commissioning Department during Mochovce Units 3 and 4 commissioning. This independent support will be in line with the Mochovce NPP 3 and 4 Directive 'Non-active tests and commissioning' and it will be carried out in form of professional and expert works focusing on supervision of fulfilment of requirements for nuclear safety observance. The TSTCS duty to provide for such services during NPP commissioning is specified by Slovak Regulatory Body legislation. The independent TSTCS will supervise; - fulfilment of requirements for nuclear safety during preparation and implementation of commissioning tests; -scientific and technical level of commissioning programmes, and reflection on nuclear safety requirements in commissioning programmes,- commissioning process and test results. Main standpoints of the Team activities for individual unit commissioning stages will be; - assesment of the selected programs of functional tests in installations having an impact on nuclear safety and evaluation of the results of these tests; - assesment of the programs of physics and power commissioning, - assesment of the unit preparedness before fuel loading start; - assesment of the unit preparedness for performing initial criticality and low power commissioning and power commissioning stages; - evaluation of the results of physics and power commissioning stages and sub-stages; - final evaluation of the results from implementing the physics and power commissioning stages. The paper also presents a short description of the Team scope activities, the Team organisation, and a procedure for issuing of standpoints to individual unit commissioning stages. (Authors)

  6. State Electricity Commission of Victoria annual report 1983-1984

    Energy Technology Data Exchange (ETDEWEB)

    1984-01-01

    The State Electricity Commission of Victoria (SECV) generates, transmits and distributes electricity throughout Victoria's 228,000 square kilometres and supplies directly to 1.390 million customers. In addition, 278,500 customers are supplied by eleven municipal authorities which purchase electricity in bulk from the Commission. The Commission also has a responsibility to ensure the safe use of electricity. The Commission's mission statement is 'to provide cost effective energy and services and to act at all times in the best interests of the people of Victoria by being a responsible, adaptive, financially sound and efficient public utility'. The mission statement is the foundation for all activities and should provide the Commission with a sense of direction and unity of purpose. Corporate objectives have been developed in the following seven broad areas: customer, employee, finance, natural resources, environment, conservation and community. Each objective has been translated into a series of specific goals, the achievement of which will be monitored. Details relating to these areas of activity are detailed in this report.

  7. Improving Internet Governance: Support to the Global Commission ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    This project provides continued support to the Global Commission on Internet Governance (GCIG) to engage the developing world in important Internet governance discussions. The funds will allow the GCIG to conduct research on the Internet-related dimensions of public policy to inform recommendations for the future of ...

  8. The Audit Commission review of diabetes services in England and Wales, 1998-2001.

    Science.gov (United States)

    Fitzsimons, B; Wilton, L; Lamont, T; McCulloch, L; Boyce, J

    2002-07-01

    AIMS OF THE AUDIT COMMISSION: The Audit Commission has a statutory duty to promote the best use of public money. It does this through value for money studies, such as that reported in Testing Times[1]. This work has been followed with a review of innovative practice in commissioning. These initiatives aim to support the implementation of the diabetes national service framework. The Audit Commission also appoints external auditors to NHS organizations who assess probity and value for money in the NHS; the latter by applying national studies locally and by carrying out local studies. Research for Testing Times consisted of structured visits to nine acute trusts, a telephone survey of 26 health authorities and a postal survey of 1400 people with diabetes and 250 general practitioners. Local audits used a subset of the original research tools. Case studies were identified through a cascade approach to contacts established during Testing Times and through self-nomination. Rising numbers of people with diabetes are placing increasing pressure on hospital services. Some health authorities and primary care organizations have reviewed patterns of service provision in the light of the increasing demands. These reviews show wide variations in patterns of routine care. In addition, there is a widespread lack of data on the delivery of structured care to people with diabetes. People with diabetes report delays in gaining access to services, and insufficient time with staff. There are insufficient arrangements in place for providing information and learning opportunities to support self-management. As the number of people with diabetes continues to rise, the potential for providing more care in a primary care setting needs to be explored. This will enable specialist services to focus more effectively on those with the most complex needs.

  9. Summary of the contributions to reactor safety research commissioned by the Republic of Austria and done by the Forschungszentrum Seibersdorf from 1987 to 1990

    International Nuclear Information System (INIS)

    Sonneck, G.; Sdouz, G.

    1991-09-01

    In 1987 the Forschungszentrum Seibersdorf was commissioned by the Republic of Austria with the collaboration in the Nuclear Safety Research Index, the OECD-LOFT-Programme and the International Coordinated Assessment and Application Programme (ICAAP). This report summarises the work done from 1987 to 1990, mainly in the field of thermal hydraulics, fuel rod behaviour and source term. Besides some analyses for experiments done in loops based on BWRs and PWRs of western design the work concentrated on safety researchs for WWERS. (Authors)

  10. The Danish Welfare Commission

    DEFF Research Database (Denmark)

    Gjerding, Allan Næs

    2006-01-01

    on public services, and install economic incentives for the behaviour of private households. The paper then digs into the proposals of the commission that are broadly grouped into five policy target areas con-cerning (1) the ageing of the population, (2) the incentives for labour market participation, (3......The paper deals with the main report of the Danish Welfare Commission and the one-hundred-and-nine proposals on the structure of the future Danish welfare state that the com-mission has put forward. Following upon a brief review of the discussion on the work of the Danish Welfare Commission......) competitiveness in the global economy, (4) behavioural regulation of the use of public bene-fits and services, and (5) management within tight budgets of an increasing demand on health and care. Finally, the concluding section sums up the discussion and elaborates on the debate on the Welfare Commission’s work...

  11. United States Nuclear Regulatory Commission staff practice and procedure digest

    International Nuclear Information System (INIS)

    1991-02-01

    This Revision 9 of the fifth edition of the NRC Staff Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period from July 1, 1972 to September 30, 1990 interpreting the NRC's Rules of Practice in 10 CFR Part 2. This Revision 9 replaces in part earlier editions and revisions and includes appropriate changes reflecting the amendments to the Rules of Practice effective through September 30, 1990. This edition of the Digest was prepared by attorneys from Aspen Systems Corporation pursuant to Contract number 18-89-346. Persons using this Digest are placed on notice that it may not be used as an authoritative citation in support of any position before the Commission or any of its adjudicatory tribunals. Persons using this Digest are also placed on notice that it is intended for use only as an initial research tool, that it may, and likely does, contain errors, including errors in analysis and interpretation of decisions, and that the user should not rely on the Digest analyses and interpretations but must read, analyze and rely on the user's own analysis of the actual Commission, Appeal Board and Licensing Board decisions cited. Further, neither the United States, the Nuclear Regulatory Commission, Aspen Systems Corporation, nor any of their employees makes any expressed or implied warranty or assumes liability or responsibility for the accuracy, completeness or usefulness of any material presented in the Digest. The Digest is roughly structured in accordance with the chronological sequence of the nuclear facility licensing process as set forth in Appendix A to 10 CFR Part 2. Those decisions which did not fit into that structure are dealt with in a section on general matters. Where appropriate, particular decisions are indexed under more than one heading. (JF)

  12. SSCL Commissioning and Operations

    International Nuclear Information System (INIS)

    1992-01-01

    The SSC, with an energy of 20 TeV/Beam, requires a sequence of individual accelerators of increasing energy in the injector chain. These are the Linac, Low Energy Booster, Medium Energy Booster, and High Energy Booster. Each accelerator system must be completed in sequence in order to provide beam to the next higher energy accelerator. The collider itself is comprised of ten sectors, each of which in terms of superconducting magnet bending strength, is equivalent to two HEB injectors. The completion of all injectors and collider sectors is required before stored beams can circulate in preparation for colliding beam operation. Four experimental halls are planned for the detector systems. Each major detector will be assembled in one of the halls by a world-wide collaboration of scientists. In addition, above ground facilities provide shops and test facilities for accelerator technical systems, superconducting magnet and materials research and development, and for detector assembly and operations. The purpose of this report is to present a plan for the sequential commissioning and operation of these individual accelerators and other technical facilities of the SSC. A central objective of this plan is to describe the activities at the SSCL that are not included as part of the construction project TPC, even though they occur during the overall project construction time-frame. Examples of such activities include the operation of general laboratory facilities and services not specifically related to construction, the operating costs for the individual accelerators in the injector chain once these facilities have been commissioned, and the costs of SSCL physics research groups. The Department of Energy has provided the following decision with regard to these operations categories for the SSCL

  13. Introductory user's manual for the US Nuclear Regulatory Commission Reactor Safety Research Data Bank. Revision 3

    International Nuclear Information System (INIS)

    Hardy, H.A.; Laats, E.T.

    1985-03-01

    The United States Nuclear Regulatory Commission (USNRC) has established the NRC/Division of Accident Evaluation (DAE) Data Bank Program to collect, store, and make available data from the many domestic and foreign water reactor safety research programs. Local direction of the program is provided by EG and G Idaho, Inc., prime contractor for the Department of Energy (DOE) at the Idaho National Engineering Laboratory (INEL). The NRC/DAE Data Bank Program provides a central computer storage mechanism and access software for data to be used by code development and assessment groups in meeting the code correlation needs of the nuclear industry. The administrative portion of the program provides data entry, documentation, training, and advisory services to users and the USNRC. The NRC/DAE Data Bank and the capabilities of the data access software are described in this document

  14. Atomic Energy Commission (Amendment) Law, 1993

    International Nuclear Information System (INIS)

    1993-02-01

    The Atomic Energy Commission (Amendment) Law, 1993 (P.N.D.C.L. 308) seeks to amend the Atomic Energy Commission Act of 1963 (Act 204) so as to provide for the establishment of a Radiation Protection Board and other institutes under the Ghana Atomic Energy Commission. The Law further repeats the Atomic Energy Commission (Amendment) Law of 1982 (P.N.D.C.L. 37). (EAA)

  15. The NRU blowdown test facility commissioning program

    Energy Technology Data Exchange (ETDEWEB)

    Walsworth, J A; Zanatta, R J; Yamazaki, A R; Semeniuk, D D; Wong, W; Dickson, L W; Ferris, C E; Burton, D H [Atomic Energy of Canada Ltd., Chalk River, ON (Canada). Chalk River Nuclear Labs.

    1990-12-31

    A major experimental program has been established at the Chalk River Nuclear Laboratories (CRL) that will provide essential data on the thermal and mechanical behaviour of nuclear fuel under abnormal reactor operating conditions and on the transient release, transport and deposition of fission product activity from severely degraded fuel. A number of severe fuel damage (SFD) experiments will be conducted within the Blowdown Test Facility (BTF) at CRL. A series of experiments are being conducted to commission this new facility prior to the SFD program. This paper describes the features and the commissioning program for the BTF. A development and testing program is described for critical components used on the reactor test section. In-reactor commissioning with a fuel assembly simulator commenced in 1989 June and preliminary results are given. The paper also outlines plans for future all-effects, in-reactor tests of CANDU-designed fuel. (author). 11 refs., 3 tabs., 7 figs.

  16. 'Animateurs' and animation: what makes a good commissioning manager?

    Science.gov (United States)

    Checkland, Kath; Snow, Stephanie; McDermott, Imelda; Harrison, Stephen; Coleman, Anna

    2012-01-01

    To examine the managerial behaviours adopted by commissioning managers in English primary care trusts (PCTs), and to explore the impact of these behaviours. Qualitative case studies were undertaken in four PCTs, focusing on staff engaged in the commissioning of hospital services. Both formal and informal observation were undertaken (150 hours), and 41 in-depth interviews conducted with managers and general practitioners (GPs). Managers adopted many managerial behaviours familiar from the literature, including sharing information, and networking inside and outside the organization. Multiple organizational layers and unclear decision-making processes hindered this activity. In addition, some managers with responsibility for facilitating practice-based commissioning (PbC) adopted a managerial mode that we have called being an 'animateur'. This approach involved the active management of disparate groups of people over whom the manager had no authority, and appeared to be a factor in determining success. It was facilitated by managerial autonomy and was more prevalent where managers were seen to have legitimacy. Some organizational practices appeared to inhibit its development. From 2012/13 it is planned that GPs will be taking more responsibility for commissioning in the English NHS. This research suggests that managers of the new commissioning organizations will require a deep and contextualized understanding of the NHS and that it is important that organizational processes do not inhibit managerial behaviour. Legitimacy may be an issue in contexts were managers are automatically transferred from their existing appointments.

  17. Cracks show in African Commission | Daniels | Africa Insight

    African Journals Online (AJOL)

    Far from providing leadership, the African Commission is riven with regional, linguistic and religious rivalries. Article Metrics. Metrics Loading ... Metrics powered by PLOS ALM · http://dx.doi.org/10.4314/ai.v31i4.22383 · AJOL African Journals Online. HOW TO USE AJOL... for Researchers · for Librarians · for Authors. OTHER ...

  18. The Lhc beam commissioning

    International Nuclear Information System (INIS)

    Redarelli, S.; Bailey, R.

    2008-01-01

    The plans for the Lhc proton beam commissioning are presented. A staged commissioning approach is proposed to satisfy the request of the Lhc experiments while minimizing the machine complexity in early commissioning phases. Machine protection and collimation aspects will be tackled progressively as the performance will be pushed to higher beam intensities. The key parameters are the number of bunches, k b , the proton intensity pe bunch, N, and the β in the various interaction points. All together these parameters determine the total beam power and the complexity of the machine. We will present the proposed trade off between the evolution of these parameters and the Lhc luminosity performance.

  19. FRM-II research neutron source commissioned

    International Nuclear Information System (INIS)

    Anon.

    2004-01-01

    On March 2, 2004, the Heinz Maier-Leibnitz research neutron source (FRM-II) generated neutrons for the first time. This marked the most important step on the way to using FRM-II for scientific purposes. On this occasion, this unique research facility in the world was dedicated in a ceremony attended by approximately 1000 representatives of politics, industry, and science. The keynote speaker, Federal Minister of the Interior Otto Schily; Bavarian Minister President Edmund Stoiber; Professor Claus Weyrich (Member of the Executive Board of Siemens AG); Dr. Thomas Goppel (Bavarian State Minister for Science, Research, and Arts); Professor Wolfgang A. Herman (President of the Technical University of Munich); Hannelore Gabor (2nd Mayor of the host municipality of Garching); and Professor Winfried Petry (Scientific Director of FRM-II) underlined the great importance of FRM-II for science, research, medicine, and technology. FRM-II will not only fill the 'neutron gap', but create extremely brilliant working conditions thanks to its considerably higher neutron flux compared to that of its predecessor, the legendary Atomic Egg. After the first conceptual design studies starting in 1980, the ground breaking ceremony in August 1996, and the third partial permit issued at Easter of 2003, a unique tool is now available for modern science and for medical and technical applications. (orig.) [de

  20. The impact of leadership development on GP mental health commissioning.

    Science.gov (United States)

    Dickerson, Emma; Fenge, Lee-Ann; Rosenorn-Lanng, Emily

    2017-07-03

    Purpose This paper aims to explore the learning needs of general practitioners (GPs) involved in commissioning mental health provision in England, and offer an evaluation of a leadership and commissioning skills development programme for Mental Health Commissioners. Design/methodology/approach Retrospective mixed method, including online mixed method survey, rating participants' knowledge, skills, abilities, semi-structured telephone interviews and third-party questionnaires were used. Results were analysed for significant differences using the Wilcoxon Signed Ranks test. Open-ended responses and interview transcripts were analysed thematically. Findings Indicative results showed that participants perceived significant impacts in ability across eight key question groups evaluated. Differences were found between the perceived and observed impact in relation to technical areas covered within the programme which were perceived as the highest scoring impacts by participants. Research limitations/implications The indicative results show a positive impact on practice has been both perceived and observed. Findings illustrate the value of this development programme on both the personal development of GP Mental Health Commissioners and commissioning practice. Although the findings of this evaluation increase understanding in relation to an important and topical area, larger scale, prospective evaluations are required. Impact evaluations could be embedded within future programmes to encourage higher participant and third-party engagement. Future evaluations would benefit from collection and analysis of attendance data. Further research could involve patient, service user and carer perspectives on mental health commissioning. Originality value Results of this evaluation could inform the development of future learning programmes for mental health commissioners as part of a national approach to improve mental health provision.

  1. The PEC Network 1993. Directory of the Peace Education Commission. Peace Education Miniprints, No. 47.

    Science.gov (United States)

    Bjerstedt, Ake, Ed.

    This extensive list of the council members of the Peace Education Commission (PEC) from 1992-1994 gives mailing addresses and some telephone and fax numbers to enable direct contact with network members. The Peace Education Commission (PEC) facilitates international cooperation among individuals interested in peace education and research related…

  2. Nuclear Regulatory Commission 1989 Information Digest

    International Nuclear Information System (INIS)

    1989-03-01

    The Nuclear Regulatory Commission 1989 Information Digest provides summary information regarding the US Nuclear Regulatory Commission, its regulatory responsibilities, and areas licensed by the Commission. This is the first of an annual publication for the general use of the NRC staff and is available to the public. The Digest is divided into two parts: the first presents an overview of the US Nuclear Regulatory Commission and the second provides data on NRC commercial nuclear reactor licensees and commercial nuclear power reactors worldwide

  3. Commissioning of radiotherapy treatment planning systems: Testing for typical external beam treatment techniques. Report of the Coordinated Research Project (CRP) on Development of Procedures for Quality Assurance of Dosimetry Calculations in Radiotherapy

    International Nuclear Information System (INIS)

    2008-01-01

    Quality Assurance (QA) in the radiation therapy treatment planning process is essential to ensure accurate dose delivery to the patient and to minimize the possibility of accidental exposure. Computerized radiotherapy treatment planning systems (RTPSs) are now widely available in both industrialised and developing countries so, it is of special importance to support hospitals in the IAEA Member States in developing procedures for acceptance testing, commissioning and ongoing QA of their RTPSs. Responding to these needs, a group of experts developed a comprehensive report, the IAEA Technical Reports Series No 430 'Commissioning and quality assurance of computerized planning systems for radiation treatment of cancer', that provides the general framework and describes a large number of tests and procedures to be considered by the RTPS users. To provide practical guidance for implementation of IAEA Technical Reports Series No. 430 in radiotherapy hospitals and particularly in those with limited resources, a coordinated research project (CRP E2.40.13) 'Development of procedures for dosimetry calculation in radiotherapy' was established. The main goal of the project was to create a set of practical acceptance and commissioning tests for dosimetry calculations in radiotherapy, defined in a dedicated protocol. Two specific guidance publications that were developed in the framework of the Coordinated Research Project E2.40.13 are based on guidelines described in the IAEA Technical Report Series No. 430 and provide a step-by-step description for users at hospitals or cancer centres how to implement acceptance and commissioning procedures for their RTPSs. The first publication, 'Specification and acceptance testing of radiotherapy treatment planning systems' IAEA-TECDOC-1540 uses the International Electrotechnical Commission (IEC) standard IEC 62083 as its basis and addresses the procedures for specification and acceptance testing of RTPSs to be used by both manufacturers and

  4. Israel Atomic Energy Commission 1996 Annual Report

    International Nuclear Information System (INIS)

    1996-01-01

    Selecting the research efforts to be highlighted in the Israel Atomic Energy Commission's Annual Report from the large body and broad spectrum of ongoing work is not an easy task. The extensive bibliography of published results attached to the report attests to the scope of this difficulty. Of the many worthwhile projects, four were chosen to represent best the current trends in the continuing R and D program at the research centers of the Israel Atomic Energy Commission. One of these trends is the growing cooperation with private industry, in an attempt to gear our R and D programs to respond to market demands. Another feature, noted already several years ago, is the extensive collaboration of our scientists and engineers with colleagues at other institutions, in Israel and abroad. some of the work reported is part of evolving international industrial cooperation projects, illustrating both these trends. Following a trend common to many nuclear research centers around the world, a substantial part of our research effort is non-nuclear in nature. This is illustrated in the first article, which deals with advances in the application of non-linear optics in diverse fields of science and technology. These include state-of-the-art solid-state lasers, rapid modulation of light signals, development and generation of tunable sources of coherent light, optical data storage and the microscopic probing of biological and inorganic samples. The present work reports on a range of R and D, from the fundamentals of non-linear optical materials to proof-of-principle demonstrations of non-linear subwavelength resolution microscopy, to fabrication of prototype commercial tunable laser systems The second report considers the microstrain characteristics in some alloys using X-ray diffraction (XRD). The research utilizes XRD line broadening effects to study the characteristics of alloys from especially prepared surfaces. These characteristics include the homogeneity of alloying

  5. 76 FR 40729 - Sunshine Act Meeting; Open Commission Meeting; Tuesday, July 12, 2011

    Science.gov (United States)

    2011-07-11

    .... 05-196); and Amending the Definition of Interconnected VoIP Service in Section 9.3 of the Commission's Rules Summary: The Commission will consider a Report and Order enabling a more effective emergency...

  6. Viet Nam National Atomic Energy Commission

    International Nuclear Information System (INIS)

    1992-01-01

    Vietnam National Atomic Energy Commission (VINATOM) is a governmental body in charge of organizing and coordinating activities related to use of nuclear energy for peaceful purpose. VINATOM in structure consists of the Nuclear Research Institute (Dalat), the Institute of Nuclear Science and Technology (Hanoi), the Institute for Technology of Radioactive and Rare Elements (Hanoi), and the Centre for Nuclear Technique Application (Ho Chi Minh City). This catalogue introduces profiles of nuclear R and D activities under management by VINATOM. (N.H.A)

  7. Commissioning of the LHC Cryogenic System Subsystems Cold Commissioning in Preparation of Full Sector Tests

    CERN Document Server

    Serio, L; Ferlin, G; Gilbert, N; Gruehagen, Henning; Knoops, S; Parente, C; Sanmartí, M

    2006-01-01

    The cryogenic system for the Large Hadron Collider accelerator is presently in its final phase of installation and commissioning at nominal operating temperatures. The refrigeration capacity for the LHC will be produced using eight large cryogenic plants installed on five technical sites and distributed around the 26.7-km circumference ring located in a deep underground tunnel. The status of the cryogenic system commissioning is presented together with the experience gained in operating and commissioning it.

  8. Commissioning plans for SSC linac

    International Nuclear Information System (INIS)

    Hurd, J.W.; Aprile, R.L.; Chang, C.R.; Crist, C.E.; Cutler, R.I.; Funk, L.W.; Guy, F.W.; Leifeste, G.T.; Raparia, D.; Saadatmand, K.; Sethi, R.C.; Swenson, D.A.; Tooker, J.; Yao, C.G.

    1992-01-01

    Presented are the general description of the SSC linac and the plans for commissioning. Sections of the linac are installed, tested, and beam commissioned in a serial approach. A specialized set of diagnostics is used to characterize the beam through each section. In addition to the standard diagnostic set, plans call for the use of a bunch shape monitor and x-ray spectrometer. Streak camera and digital imaging diagnostics will be developed. The commissioning plan is folded into the general linac project schedule to show the relation between delivery, staging, installation, conditioning, and actual commissioning with beam. These plans form the basis for coordination between the various organizations responsible for different elements of the linac including the technical components, infrastructure, and temporary staging and operation facilities. (Author) 2 figs., 17 refs

  9. U.S. Nuclear Regulatory Commission bases for control of solid materials

    International Nuclear Information System (INIS)

    Meck, R.A.; Cardille, F.P.; Feldman, C.; Gnugnoli, G.N.; Huffert, A.M.; Klementowicz, S.P.

    2002-01-01

    The U.S. Nuclear Regulatory Commission (NRC) is considering whether to proceed with rulemaking on the control of solid materials with very low levels of associated radioactivity. The current implementation of clearance by NRC licensees is the context for the decision. Inputs to the decision include information gathering efforts of the Commission in the areas of public workshops, dose assessments and inventories, the recommendations of the National Academies' National Research Council (NAs) on regulatory alternatives, and participation in international efforts by the International Atomic Energy Agency (IAEA). (author)

  10. 17 CFR 201.57 - Commission review.

    Science.gov (United States)

    2010-04-01

    ... 17 Commodity and Securities Exchanges 2 2010-04-01 2010-04-01 false Commission review. 201.57... Regulations Pertaining to the Equal Access to Justice Act § 201.57 Commission review. In accordance with the... Division of the Commission may seek review of the initial decision on the fee application, or the...

  11. Commissioning of ATLAS

    CERN Document Server

    Thomas, J

    2008-01-01

    The status of the commissioning of the ATLAS experiment as of May 2008 is presented. The subdetector integration in recent milestone weeks is described, especially the cosmic commissioning in milestone week M6, focussing on combined running and track analysis of the muon detector and inner detector. The liquid argon and tile calorimeters have achieved near-full operation, and are integrated with the calorimeter trigger. The High-Level-Trigger infrastructure is installed and algorithms tested in technical runs. Problems with the inner detector cooling compressors are being fixed.

  12. ATF2 Commissioning

    Energy Technology Data Exchange (ETDEWEB)

    Seryi, A.; /SLAC; Christian, G.; /KLTE-ATOMKI; Parker, B.; /BNL; Schulte, D.; Delahaye, J.-P.; Tomas, R.; Zimmermann, F.; /CERN; Wolski, A.; Elsen, E.; /Cockcroft Inst. /DESY; Sanuki, T.; /Tohoku U.; Gianfelice-Wendt, E.; Ross, M.; Wendt, M.; /Fermilab; Takahashi, T.; /Hiroshima U.; Bai, S.; Gao, J.; /Beijing, Inst. High Energy Phys.; Bolzon, B.; Geffroy, N.; Jeremie, A.; /Annecy, LAPP; Apsimon, R.; Burrows, P.; /Oxford U., JAI /Kyoto U., Inst. Chem. Res. /Kyungpook Natl. U. /Orsay, LAL /Phang Accelerator Lab /Royal Holloway, U. of London /SLAC /Daresbury /University Coll. London /Manchester U. /Univ. of Tokyo U.

    2009-10-30

    ATF2 is a final-focus test beam line that aims to focus the low-emittance beam from the ATF damping ring to a beam size of about 37 nm, and at the same time to demonstrate nm beam stability, using numerous advanced beam diagnostics and feedback tools. The construction has been finished at the end of 2008 and the beam commissioning of ATF2 has started in December of 2008. ATF2 is constructed and commissioned by ATF international collaborations with strong US, Asian and European participation.

  13. ATF2 COMMISSIONING

    CERN Document Server

    Seryi, A; Parker, B; Schulte, D; Delahaye, J P; Tomas, R; Zimmermann, F; Wolski, A; Elsen, E; Sanuki, T; Gianfelice-Wendt, E; Ross, M; Wendt, M; Takahashi, T; Bai, S; Gao, J; Bolzon, B; Geffroy, N; Jeremie, A; Apsimon, R; Burrows, P; Constance, B; Perry, C; Resta-Lopez, J; Swinson, C; Araki, S; Aryshev, A; Hayano, H; Honda, Y; Kubo, K; Kume, T; Kuroda, S; Masuzawa, M; Naito, T; Okugi, T; Sugahara, R; Tauchi, T; Terunuma, N; Urakawa, J; Yokoya, K; Iwashita, Y; Sugimoto, T; Heo, A Y; Kim, E S; Kim, H S; Bambade, P; Renier, Y; Rimbault, C; Huang, J Y; Kim, S H; Park, Y J; Hwang, W H; Blair, G; Boogert, S; Karataev, P; Molloy, S; Amann, J; Bellomo, P; Lam, B; McCormick, D; Nelson, J; Paterson, E; Pivi, M; Raubenheimer, T; Spencer, C; Wang, M H; White, G; Wittmer, W; Woodley, M; Yan, Y; Zhou, F; Angal-Kalinin, D; Jones, J; Lyapin, A; Scarfe, A; Kamiya, Y; Komamiya, S; Oroku, M; Suehara, T; Yamanaka, T

    2010-01-01

    ATF2 is a final-focus test beam line that aims to focus the low-emittance beam from the ATF damping ring to a beam size of about 37 nm, and at the same time to demonstrate nm beam stability, using numerous advanced beam diagnostics and feedback tools. The construction has been finished at the end of 2008 and the beam commissioning of ATF2 has started in December of 2008. ATF2 is constructed and commissioned by ATF international collaborations with strong US, Asian and European participation.

  14. Joint Commission

    Science.gov (United States)

    ... for the latest publication of The Joint Commission Journal on Quality and Patient Safety (JQPS). . How We Work Process improvement program breeds quality culture, empowers staff An article in Quality Progress, June ...

  15. Cracks show in African Commission | Daniels | Africa Insight

    African Journals Online (AJOL)

    Far from providing leadership, the African Commission is riven with regional, linguistic and religious rivalries. http://dx.doi.org/10.4314/ai.v31i4.22383 · AJOL African Journals Online. HOW TO USE AJOL... for Researchers · for Librarians · for Authors · FAQ's · More about AJOL · AJOL's Partners · Terms and Conditions of Use ...

  16. National Bioethics Commissions as Educators.

    Science.gov (United States)

    Lee, Lisa M

    2017-05-01

    As has become tradition, executive directors of United States' presidential bioethics committees offer reflections about their experience shortly after the orderly shutdown of the commission staff. After the records are filed according to government records regulations; after all the staff members, who are hired into temporary positions that must be renewed every two years, have secured permanent employment; after preparations are made to ensure that the next commission staff (should there be one) has a budget and standard operating procedures in order to begin its work in a timely manner; after the lights are turned out for the last time, the executive director makes the final climb up the stairs into the sunlight and reflects on the whirlwind. There is much about my work with the Presidential Commission for the Study of Bioethical Issues that deserves comment, but one aspect of the commission that has been especially valuable to me is its work to educate the nation on bioethical issues. This is, moreover, a contribution in which the commission staff was central, and it is one that, as an ethics educator myself, I will cherish deeply. © 2017 The Hastings Center.

  17. Commissioning of the nuclear power plant

    International Nuclear Information System (INIS)

    Furtado, P.M.; Rolf, F.

    1984-01-01

    Nuclear Power Plant Angra 2, located at Itaorna Beach-Angra dos Reis is the first plant of the Brazilian-German Agreement to be commissioned. The Nuclear Power Plant is a pressurized water reactor rated at 3765 Mw thermal/1325 Mw electrical. For commissioning purpose the plant is divided into 110 systems. Plant commissioning objective is to demonstrate the safe and correct operation of each plan component, system and of the whole plant in agreement with design conditions, licensing requirements and contractual obligations. This work gives a description of plant commissioning objectives, activities their time sequence, and documentation. (Author) [pt

  18. Molr - A delegation framework for accelerator commissioning

    CERN Document Server

    Valliappan, Nachiappan

    2017-01-01

    Accelerator commissioning is the process of preparing an accelerator for beam operations. A typical commissioning period at CERN involves running thousands of tests on many complex systems and machinery to ensure smooth beam operations and correct functioning of the machine protection systems. AccTesting is a software framework which helps orchestrate the commissioning of CERN’s accelerators and it’s equipment systems. This involves running and managing tests provided by various commissioning tools and analyzing their outcomes. Currently, AccTesting only supports a specific set of commissioning tools. In this project, we aim to widen the spectrum of commissioning tools supported by AccTesting by developing a generic and programmable integration framework called Molr, which would enable the integration of more commissioning tools with AccTesting. In this report, we summarize the work done during the summer student project and lay out a brief overview of the current status and next steps for Molr.

  19. 26th May 2011 -Delegate to CERN Open Council sessions and European Commission Head of Unit for Joint Programming European Research Area, DG Research and Innovation R. Lečbychová visiting the CERN Control Centre with M. Pojer, accompanied by CERN S. Stavrev.

    CERN Multimedia

    Maximilien Brice

    2011-01-01

    26th May 2011 -Delegate to CERN Open Council sessions and European Commission Head of Unit for Joint Programming European Research Area, DG Research and Innovation R. Lečbychová visiting the CERN Control Centre with M. Pojer, accompanied by CERN S. Stavrev.

  20. The Industry Commission inquiry into charitable organisations.

    Science.gov (United States)

    Suter, K

    1996-01-01

    The Industry Commission has carried out Australia's largest inquiry into charities. It was, from the point of view of charities, an unsatisfactory operation, all the more so since it was not clear why the task had been given to the commission. This article examines the commission's work in three ways: the overall relationship between government and charities; the commission's proposed major reforms; and the minor reforms.

  1. Nuclear Regulatory Commission issuances, October 1993

    International Nuclear Information System (INIS)

    1993-10-01

    This document contains a Commission issuance in which the Commission denies the petitioners' motion to quash or modify a subpoena issued by the NRC staff in the course of an investigation to determine if the petitioners' have violated NRC regulations and to determine if safety-related problems exist at NRC-licensed facilities. The pertinent regulations and the Commission's Memorandum and Order are included

  2. Reactor Safety Commission Code of Practice for Pressurized Water Reactors

    International Nuclear Information System (INIS)

    1990-01-01

    The Reactor Safety Commission of the Federal German Republic has summarized in the form of Official Guidelines the safety requirements which, in the Commission's view, have to be met in the design, construction and operation of a nuclear power station equipped with a pressurized water reactor. The Third Edition of the RSK Guidelines for pressurized water reactors dated 14.10.81. is a revised and expanded version of the Second Edition dated 24.1.79. The Reactor Safety Commission will with effect from October 1981 use these Guidelines in consultations on the siting of and safety concept for the installation approval of future pressurized water reactors and will assess these nuclear power stations during their erection in the light of these Guidelines. They have not however been immediately conceived for the adaptation of existing nuclear power stations, whether under construction or in operation. The scope of application of these Guidelines to such nuclear power stations will have to be examined for each individual case. The main aim of the Guidelines is to simplify the consultation process within the reactor Safety Commission and to provide early advice on the safety requirements considered necessary by the Commission. (author)

  3. The role of nurses in commissioning services within primary care.

    Science.gov (United States)

    Leach, Katherine; Shepherd, Alison Burton

    2013-04-01

    This article is a critical reflection on the role of the nurse in commissioning a service within the primary care setting. It will use the fictitious example of commissioning a nurse-led crisis prevention service in the London borough of Lambeth as an exemplar to highlight the difficulties surrounding the commissioning process. In placing particular focus on the prevalence of smoking, it is suggested that designing services based around tackling 'clusters' of unhealthy risk factors such as smoking, diet and excessive alcohol consumption may be a more holistic approach to delivering better healthcare outcomes for more socioeconomically deprived populations as opposed to previous national siloed attempts (Buck and Forsini 2012;1). It will argue that despite multifaceted and evolving roles, community nurses are ideally placed to recognise compounding risk factors detrimental to health as they work at the interface between the individual and their environment. This awareness can be used to positively impact on the commissioning process but only if greater attention is paid towards enhancing leadership skills throughout nursing, and the rhetoric of effective collaboration across agencies is translated into practice (Ham et al, 2012; NHS Commissioning Board (NHS CB), 2012), NHS Alliance, 2011).

  4. Making the Choices Necessary to Make a Difference: The Responsibility of National Bioethics Commissions.

    Science.gov (United States)

    Grady, Christine

    2017-05-01

    In this essay, I offer some reflections on how the topics were identified and approached by the Presidential Commission for the Study of Bioethical Issues, on which I had the honor to serve, in the hope that the reflections may be useful to future national bioethics commissions. In the executive order that established the bioethics commission, President Obama explicitly recognized the ethical imperative to responsibly pursue science, innovation, and advances in biomedical research and health care, and the importance of national attention to these issues. The bioethics commission prioritized practicable, actionable, targeted recommendations. Like most earlier U.S. national bioethics commissions, President Obama's commission did not undertake projects on significant and troublesome issues related to health and health care that were not associated with new science or technology. Issues such as health care access, health care delivery, opioid addiction, end-of-life care, and physician-aid-in-dying are topical and ethically complex areas of significance to bioethics, and they are also being discussed and debated by the public, the media, and policy-makers. In my view, there are good reasons to select and prioritize projects as well as a justification for confining commission efforts to issues related to novel science and emerging technologies, when there is only one national-level bioethics commission that has been established by the Office of the President. © 2017 The Hastings Center.

  5. Commission 1

    African Journals Online (AJOL)

    state" to provide the Commission with information on the measures that they have ...... policies and identify the gaps in ensuring the full realisation of socio- economic .... Boulle L, Harris Band Hoexter C Constitutional and Administrative Law.

  6. arXiv Medical Physics Commissioning

    CERN Document Server

    Meer, David

    The medical commissioning is an important step to bring a particle gantry into clinical operation for tumour treatments. This involves the parametrization and characterization of all relevant systems including the beam delivery, the patient table, the imaging systems and the connection to all required software components. This article is limited to necessary tasks for the beam delivery system of a pencil beam scanning system. Usually the commissioning starts with the characterization of the unscanned beam and the calibration of the beam energy. The following steps are the parametrization of the scanning system, the commissioning of the beam position monitoring system and characterization of the spot size, all requiring precisions better than 1 mm. The commissioning effort for these tasks depends also on the gantry topology. Finally, the calibration of the dose measurement system ensures that any dose distribution can be delivered with an absolute precision better than 1%.

  7. Monitoring-based HVAC commissioning of an existing office building for energy efficiency

    International Nuclear Information System (INIS)

    Wang, Liping; Greenberg, Steve; Fiegel, John; Rubalcava, Alma; Earni, Shankar; Pang, Xiufeng; Yin, Rongxin; Woodworth, Spencer; Hernandez-Maldonado, Jorge

    2013-01-01

    Highlights: ► Demonstrated monitoring-based HVAC commissioning using an existing office building. ► Diagnosed various types of faulty operation in the HVAC system by trend data analyses. ► Identified a list of energy saving measures for the HVAC system. ► Quantified energy saving potential for each commissioning measure using calibrated energy simulation model. ► Achieved an actual energy saving of 10% after the implementations of cost-effective measures. -- Abstract: The performance of Heating, Ventilation and Air Conditioning (HVAC) systems may fail to satisfy design expectations due to improper equipment installation, equipment degradation, sensor failures, or incorrect control sequences. Commissioning identifies and implements cost-effective operational and maintenance measures in buildings to bring them up to the design intent or optimum operation. An existing office building is used as a case study to demonstrate the process of commissioning. Building energy benchmarking tools are applied to evaluate the energy performance for screening opportunities at the whole building level. A large natural gas saving potential was indicated by the building benchmarking results. Faulty operations in the HVAC systems, such as improper operations of air-side economizers, simultaneous heating and cooling, and ineffective optimal start, were identified through trend data analyses and functional testing. The energy saving potential for each commissioning measure is quantified with a calibrated building simulation model. An actual energy saving of 10% was realized after the implementations of cost-effective measures.

  8. Activities of the National Academy of Sciences in relation to the Radiation Effects Research Foundation

    International Nuclear Information System (INIS)

    Edington, C.W.

    1991-02-01

    The activities of the National Academy of Sciences (NAS), in relation to the Radiation Effects Research Foundation (RERF), has a long history and the specific time period supported by this contract is but a small piece of the long-term continuing program. As a background, in August 1945, atomic bombs were dropped on Hiroshima (6 August) and Nagasaki (9 August). Shortly after the bombings, US medical teams joined forces with their Japanese counterparts to form a Joint Commission for the Investigation of the Effects of the Atomic Bombs. As a result of the Joint Commission's investigations, it was determined that consideration should be given to the establishment of a long-term study of the potential late health effects of exposure of the survivors to radiation from the bombs. The results obtained from RERF studies contribute the vast majority of information that provides a better understanding of radiation effects on humans. This information has been used extensively by national organizations and international committees for estimating risks associated with radiation exposures. The estimated risks developed by these independent organizations are used by government agencies around the world to establish standards for protection of individuals exposed in the occupational, medical, and general environment. Some of these results are described briefly in this report

  9. 78 FR 44165 - Nuclear Regulatory Commission Enforcement Policy

    Science.gov (United States)

    2013-07-23

    ... NUCLEAR REGULATORY COMMISSION [NRC-2013-0159] Nuclear Regulatory Commission Enforcement Policy AGENCY: Nuclear Regulatory Commission. ACTION: Enforcement policy; request for comment. SUMMARY: The U.S... Policy. In SRM-SECY-12-0047, ``Revisions to the Nuclear Regulatory Commission Enforcement Policy,'' dated...

  10. Instrumented home energy rating and commissioning

    Energy Technology Data Exchange (ETDEWEB)

    Wray, Craig P.; Walker, Iain S.; Sherman, Max H.

    2003-05-01

    Currently, houses do not perform optimally or even as many codes and forecasts predict, largely because they are field assembled and there is no consistent process to identify deficiencies or to correct them. Solving this problem requires field performance evaluations using appropriate and agreed upon procedures in the form of a new process called residential commissioning. The purpose of this project is to develop and document these procedures and to demonstrate the value that applying them could provide in both new and existing California houses. This project has four specific objectives: to develop metrics and diagnostics for assessing house performance, to provide information on the potential benefits of commissioning using a whole-house approach, to develop programmatic guidelines for commissioning, and to conduct outreach efforts to transfer project results to industry stakeholders. The primary outcomes from this project are the development of residential commissioning guidelines and the analytical confirmation that there are significant potential benefits associated with commissioning California houses, particularly existing ones. In addition, we have made substantial advances in understanding the accuracy and usability of diagnostics for commissioning houses. In some cases, we have been able to work with equipment manufacturers to improve these aspects of their diagnostic tools. These outcomes provide a solid foundation on which to build a residential commissioning program in California. We expect that a concerted effort will be necessary to integrate such a program with existing building industry efforts and to demonstrate its use in the field.

  11. State Energy Commission of Western Australia. 1985 annual report

    Energy Technology Data Exchange (ETDEWEB)

    1985-01-01

    The report reviews the operations and achievements of the Commission during 1984/85, and also outlines plans aimed at providing reliable and cost-effective energy supplies in Western Australia in the future. The Commission completed the 1984/85 financial year with an operating surplus of 4.3 m dollars. This compared with a surplus of 4.4 m dollars for the previous year. A full set of financial statements, certified by the Auditor General of Western Australia as being properly drawn up and fairly presented, appears in the back of the report.

  12. Building Commissioning: A Golden Opportunity for Reducing Energy Costs and Greenhouse-gas Emissions

    Energy Technology Data Exchange (ETDEWEB)

    Mills, Evan

    2009-07-16

    The aim of commissioning new buildings is to ensure that they deliver, if not exceed, the performance and energy savings promised by their design. When applied to existing buildings, commissioning identifies the almost inevitable 'drift' from where things should be and puts the building back on course. In both contexts, commissioning is a systematic, forensic approach to quality assurance, rather than a technology per se. Although commissioning has earned increased recognition in recent years - even a toehold in Wikipedia - it remains an enigmatic practice whose visibility severely lags its potential. Over the past decade, Lawrence Berkeley National Laboratory has built the world's largest compilation and meta-analysis of commissioning experience in commercial buildings. Since our last report (Mills et al. 2004) the database has grown from 224 to 643 buildings (all located in the United States, and spanning 26 states), from 30 to 100 million square feet of floorspace, and from $17 million to $43 million in commissioning expenditures. The recorded cases of new-construction commissioning took place in buildings representing $2.2 billion in total construction costs (up from 1.5 billion). The work of many more commissioning providers (18 versus 37) is represented in this study, as is more evidence of energy and peak-power savings as well as cost-effectiveness. We now translate these impacts into avoided greenhouse gases and provide new indicators of cost-effectiveness. We also draw attention to the specific challenges and opportunities for high-tech facilities such as labs, cleanrooms, data centers, and healthcare facilities. The results are compelling. We developed an array of benchmarks for characterizing project performance and cost-effectiveness. The median normalized cost to deliver commissioning was $0.30/ft2 for existing buildings and $1.16/ft2 for new construction (or 0.4% of the overall construction cost). The commissioning projects for which

  13. Nuclear Regulatory Commission Issuances

    International Nuclear Information System (INIS)

    1992-01-01

    This is the thirty-sixth volume of issuances (1-396) of the Nuclear Regulatory Commission and its Atomic Safety and Licensing Boards, Administrative Law Judges, and Office Directors. It covers the period from July 1, 1992-December 31, 1992. Atomic Safety and Licensing Boards are authorized by Section 191 of the Atomic Energy Act of 1954. These Boards, comprised of three members conduct adjudicatory hearings on applications to construct and operate nuclear power plants and related facilities and issue initial decisions which, subject to internal review and appellate procedures, become the final Commission action with respect to those applications. Boards are drawn from the Atomic Safety and Licensing Board Panel, comprised of lawyers, nuclear physicists and engineers, environmentalists, chemists, and economists. The Atomic Energy Commission first established Licensing Boards in 1962 and the Panel in 1967

  14. Decree no. 2005-79 from January 26, 2005, authorizing the Atomic Energy Commission to proceed to the definitive shutdown and dismantling operations of the nuclear facility no.21, named Siloette research reactor, in the Grenoble city territory (Isere)

    International Nuclear Information System (INIS)

    2005-02-01

    On May 26, 2003, the French atomic energy commission (CEA) addressed an authorization demand for the definitive shutdown and dismantling of the Siloette research reactor. After a technical and administrative instruction of this demand by the French nuclear safety authority (ASN), a project of decree has been presented on July 6, 2004 at the permanent section of the inter-ministry commission of basic nuclear facilities. The commission gave its favourable judgment which is the object of this decree. (J.S.)

  15. Research laboratories annual report 1993

    International Nuclear Information System (INIS)

    1994-08-01

    The 1993 annual report of the Israel Atomic Energy Commission presents, in brief and concise form, recent results and achievements of the well established program of the basic and applied research carried out by the scientists and engineers of the Israel Atomic Energy Commission in collaboration with colleagues at the other institutions in Israel and abroad. In terms of contents, the report presents the usual combination of topical basic applied research. Much of the work has been published or submitted for publication in the international scientific or technical literature. The main headings in the report are: theoretical physics and theoretical chemistry; optics and lasers; solid states and nuclear physics; materials sciences; chemistry; environmental studies and radiopharmaceuticals; radiation effects, dosimetry and radioprotection; and instrumentation and techniques

  16. COMMISSIONING AND DETECTOR PERFORMANCE GROUPS (DPG)

    CERN Multimedia

    Tiziano Camporesi

    Pit commissioning activities The last 4 months have seen various major achievements in hardware commissioning, global data taking, readiness of the DPGs to deal with LHC data flows and alignment and calibration workflows. Since February, the global commissioning has been characterized on the one side by more and more of the final CMS detector becoming available for global readout and triggering and on the other side by consolidation of many of the central software infrastructure and of most of the services infrastructure. The reliability of services like cooling, power, gas has markedly improved with respect to what we observed in the second half of 2007.   Of particular note are the delivery of all low voltage power supplies, the commissioning of the final power distribution, the progressive commissioning ( still ongoing)  of the Detector Safety System and of the associated DCS early warning and alarm system. On the detector side, while already we are used to seeing all of HCAL being exe...

  17. COMMISSIONING AND DETECTOR PERFORMANCE GROUPS

    CERN Multimedia

    D. Acosta

    The commissioning effort is presently addressing two main areas: the commissioning of the hardware components at the pit and the coordination of the activities of the newly constituted Detector Performance groups (DPGs). At point 5, a plan regarding the service cavern and the commissioning of the connections of the off-detector electronics (for the data collection line and trigger primitive generation) to the central DAQ and the central Trigger has been defined. This activity was started early February and will continue until May. It began with Tracker electronics followed so far by HCAL and CSC. The goal is to have by May every detector commission, as much as possible, their data transfer paths from FED to Central DAQ as well as their trigger setups between TPGs and Global Level 1 trigger. The next focus is on connections of front-ends to the service cavern. This depends strongly on the installations of services. Presently the only detector which has its link fibers connected to the off-detector electr...

  18. Danish Atomic Energy Commission Annual Report 1 April 1974 -31 March 1975

    International Nuclear Information System (INIS)

    1975-10-01

    Activities of the Danish Atomic Energy Commission and the Risoe Research Establishment for the period April 1, 1974 to March 31, 1975 are summarized. The operations of the various facilities at the Research Establishment are revised. Operating staff levels and financial data are tabulated, and a list of staff publications is given. (author)

  19. 17 CFR 171.28 - Participation by Commission staff.

    Science.gov (United States)

    2010-04-01

    ... staff. 171.28 Section 171.28 Commodity and Securities Exchanges COMMODITY FUTURES TRADING COMMISSION..., Membership Denial and Registration Actions § 171.28 Participation by Commission staff. The Division of.... The Commission shall by order establish a supplementary briefing schedule for the Commission staff and...

  20. ICBEN review of research on the biological effects of noise 2011-2014

    Science.gov (United States)

    Basner, Mathias; Brink, Mark; Bristow, Abigail; de Kluizenaar, Yvonne; Finegold, Lawrence; Hong, Jiyoung; Janssen, Sabine A; Klaeboe, Ronny; Leroux, Tony; Liebl, Andreas; Matsui, Toshihito; Schwela, Dieter; Sliwinska-Kowalska, Mariola; Sörqvist, Patrik

    2015-01-01

    The mandate of the International Commission on Biological Effects of Noise (ICBEN) is to promote a high level of scientific research concerning all aspects of noise-induced effects on human beings and animals. In this review, ICBEN team chairs and co-chairs summarize relevant findings, publications, developments, and policies related to the biological effects of noise, with a focus on the period 2011-2014 and for the following topics: Noise-induced hearing loss; nonauditory effects of noise; effects of noise on performance and behavior; effects of noise on sleep; community response to noise; and interactions with other agents and contextual factors. Occupational settings and transport have been identified as the most prominent sources of noise that affect health. These reviews demonstrate that noise is a prevalent and often underestimated threat for both auditory and nonauditory health and that strategies for the prevention of noise and its associated negative health consequences are needed to promote public health. PMID:25774609

  1. Point Lepreau G.S. commissioning management experience

    International Nuclear Information System (INIS)

    Alikhan, S.; Walker, W.J.

    1983-05-01

    This paper shares the experience gained by New Brunswick Power in commissioning its first nuclear plant, with particular emphasis on the management techniques that were developed. Some of the areas discussed include: organization of Nuclear Operations Group responsible for commissioning and its interface with construction; outline and scope of documentation required to define, execute and report commissioning to satisfy the licensing requirements, management techniques developed to implement commissioning; and a summary of lessons learned and recommendations for the future

  2. Commissions as information organizations: Meeting the information needs of an electronic society

    Energy Technology Data Exchange (ETDEWEB)

    Sevel, F.

    1997-11-01

    This paper describes how commission-sponsored web sites can effectively meet electronic information needs. Demographics of internet users are presented and analyzed. Online activities and user access data are also described. The implications of the characteristics of internet users for commission-sponsored web sites are discussed, and guidelines for determining marketing objectives are presented.

  3. 19 CFR 213.5 - Access to Commission resources.

    Science.gov (United States)

    2010-04-01

    ... 19 Customs Duties 3 2010-04-01 2010-04-01 false Access to Commission resources. 213.5 Section 213.5 Customs Duties UNITED STATES INTERNATIONAL TRADE COMMISSION INVESTIGATIONS OF UNFAIR PRACTICES IN IMPORT TRADE TRADE REMEDY ASSISTANCE § 213.5 Access to Commission resources. Commission resources, in...

  4. Alaska Public Offices Commission, Department of Administration, State of

    Science.gov (United States)

    Visiting Alaska State Employees State of Alaska Department of Administration Alaska Public Offices Commission Alaska Department of Administration, Alaska Public Offices Commission APOC Home Commission Filer ; AO's Contact Us Administration > Alaska Public Offices Commission Alaska Public Offices Commission

  5. 47 CFR 0.420 - Other Commission publications.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Other Commission publications. 0.420 Section 0... Information Printed Publications § 0.420 Other Commission publications. The following additional Commission publications may be purchased from the Superintendent of Documents: (a) Statistics of Communications Common...

  6. Commissioning of the new heat exchanger for the research nuclear reactor IEA-R1

    Energy Technology Data Exchange (ETDEWEB)

    Castro, Alfredo Jose Alvim de; Cassiano, Douglas Alves; Umbehaun, Pedro Ernesto; Carvalho, Marcos Rodrigues de; Frajndlich, Roberto [Instituto de Pesquisas Energeticas e Nucleares (IPEN/CNEN-SP), Sao Paulo, SP (Brazil)]. E-mails: ajcastro@ipen.br; docass@gmail.com.br; umbehaun@ipen.br; carvalho@ipen.br; frajndli@ipen.br

    2008-07-01

    The Research Reactor IEA-R1 placed at IPEN/CNEN-SP is of the swimming pool type, light water moderated and with graphite reflectors, and was build and designed by Babcock and Wilcox Co. Start up operation was in September the 16{sup th}, 1957, being the first criticality for South Hemisphere. Although designed to operate at 5 MW, the IEA-R1 was operated until 2001 with 2 MW and was suitable for use in basic and applied research as well as the production of medical radioisotopes, industry and natural sciences applications. Due to a recent demand increase on radioisotopes in Brazil for medical diagnoses and therapies applications, IPEN /CNEN updated the IEA-R1 power to 5 MW and to work at continuous operation regime. Studies on the Ageing Management for the Research Reactor IEA-R1 were conducted according to IAEA procedures. As result of these studies critical components within the Ageing Management Program were identified. Also were made recommendations on the implementation of test scheduling and standardization procedures to organize data and documents. One of the main results was the need of monitoring the two heat exchangers, the two primary circuit pumps and the data acquisition system. During monitoring procedures, issues were observed on the IEA-R1 operation at 5 MW mainly due to the ageing of the Babcox and Wilcox TCA heat exchanger, and excessive vibrations at high flow rates on CBC's TCB heat exchanger. So, from 2005 on, it was decided to work with 3,5 MW and provide a new IESA heat exchanger with 5 MW capacity, to substitute the TCA heat exchanger. This work presents results on the commissioning of the new heat exchanger and compares against the values calculated in the IESA project. The results show that the IEA-R1 Reactor can be operated more safety and continuously at 5 MW with the new IESA heat exchanger. (author)

  7. 29 CFR 2200.92 - Review by the Commission.

    Science.gov (United States)

    2010-07-01

    ... Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH REVIEW COMMISSION RULES OF PROCEDURE Posthearing Procedures § 2200.92 Review by the Commission. (a) Jurisdiction of the Commission; issues on... Commission to review the entire case. The issues to be decided on review are within the discretion of the...

  8. Determinants of perceived and actual knowledge of commission paid by contributors in the pension funds industry

    Directory of Open Access Journals (Sweden)

    Pablo Farías

    2017-01-01

    Full Text Available This paper examines the determinants of perceived and actual knowledge of commission paid by contributors in the Chilean pension funds industry. Results show that price consciousness and brand credibility are positively associated with perceived and actual knowledge of commission paid by pension fund contributors. Results also show that financial literacy is only positively associated with actual knowledge of commission paid by contributors. Additionally, results show that price based advertising exposure is only positively associated with perceived knowledge of commission paid by contributors. This association is stronger for contributors with a high use of the price-quality cue. Based on the findings presented, implications for managers, regulators and researchers are drawn.

  9. National Capital Planning Commission Library contents

    Data.gov (United States)

    National Capital Planning Commission — The National Capital Planning Commission library catalog is a compilation of titles, authors, years of publication and topics of books, reports and NCPC publications.

  10. Academic Public Relations Curricula: How They Compare with the Bateman-Cutlip Commission Standards.

    Science.gov (United States)

    McCartney, Hunter P.

    To see what effect the 1975 Bateman-Cutlip Commission's recommendations have had on improving public relations education in the United States, 173 questionnaires were sent to colleges or universities with accredited or comprehensive programs in public relations. Responding to five basic assumptions underlying the commission's recommendations,…

  11. Analogue studies at the french atomic commission (CEA)

    International Nuclear Information System (INIS)

    Petit, J.C.

    1986-06-01

    The different research activities of the French Atomic Energy Commission in the analogue study field are presented. Most of them are conducted in collaboration with major research organisations, both french and international. In fact, the scientific community has been associated to these programmes at different steps of their realisation. The brief description presented illustrates the great diversity and complementarity of actions conducted by CEA for better understanding, through the study of natural analogues, the basic processes that will rule the long term behaviour of high level radwaste materials in a repository and hence contributing to hopefully guaranty disposal safety

  12. The Commissioning of the LHC Technical Systems

    CERN Document Server

    Saban, R; Baggiolini, V; Ballarino, A; Barbero-Soto, E; Bellesia, B; Bordry, Frederick; Bozzini, D; Casas-Lino, M-P; Chareyre, V; Claudet, S; Coelingh, G-J; Dahlerup-Petersen, K; Denz, R; Fehér, S; Flora, R; Gruwé, M; Kain, V; Kirby, G; Koratzinos, M; Lauckner, R; Le Naour, S; Mess, K-H; Millet, F; Montabonnet, V; Nisbet, D; Perea-Solano, B; Pojer, M; Principe, R; Rabehl, R; Rijllart, A; Redaelli, S; Rodríguez-Mateos, F; Schmidt, R; Serio, L; Siemko, A; Solfaroli-Camillocci, M; Thiesen, H; Venturini, W; Vergara-Fernandez, A; Verweij, A; Zerlauth, M

    2007-01-01

    The LHC is an accelerator with unprecedented complexity where the energy stored in magnets and the beams exceeds other accelerators by one-to-two orders of magnitude. To ensure a safe and efficient machine start-up without being plagued by technical problems, a phase of "hardware commissioning" was introduced: a thorough commissioning of technical systems without beam. This activity started in June 2005 with the commissioning of individual systems, followed by operating a full sector, one eighth of the machine; the commissioning is expected to last until spring 2008 when commissioning with beam will start. The LHC architecture allows the commissioning of each of the eight sectors independently from the others, before the installation of other sectors is complete. An important effort went into the definition of the programme and the organization of the coordination in the field, as well as in the preparation of the tools to record and analyze test results. This paper discusses the experience with this approach...

  13. 45 CFR 702.12 - Contempt of the Commission.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 3 2010-10-01 2010-10-01 false Contempt of the Commission. 702.12 Section 702.12 Public Welfare Regulations Relating to Public Welfare (Continued) COMMISSION ON CIVIL RIGHTS RULES ON HEARINGS, REPORTS, AND MEETINGS OF THE COMMISSION Hearings and Reports § 702.12 Contempt of the Commission...

  14. Regional health workforce planning through action research: lessons for commissioning health services from a case study in Far North Queensland.

    Science.gov (United States)

    Panzera, Annette June; Murray, Richard; Stewart, Ruth; Mills, Jane; Beaton, Neil; Larkins, Sarah

    2016-01-01

    Creating a stable and sustainable health workforce in regional, rural and remote Australia has long been a challenge to health workforce planners, policy makers and researchers alike. Traditional health workforce planning is often reactive and assumes continuation of current patterns of healthcare utilisation. This demonstration project in Far North Queensland exemplifies how participatory regional health workforce planning processes can accurately model current and projected local workforce requirements. The recent establishment of Primary Health Networks (PHNs) with the intent to commission health services tailored to individual healthcare needs underlines the relevance of such an approach. This study used action research methodology informed by World Health Organization (WHO) systems thinking. Four cyclical stages of health workforce planning were followed: needs assessment; health service model redesign; skills-set assessment and workforce redesign; and development of a workforce and training plan. This study demonstrated that needs-based loco-regional health workforce planning can be achieved successfully through participatory processes with stakeholders. Stronger health systems and workforce training solutions were delivered by facilitating linkages and planning processes based on community need involving healthcare professionals across all disciplines and sectors. By focusing upon extending competencies and skills sets, local health professionals form a stable and sustainable local workforce. Concrete examples of initiatives generated from this process include developing a chronic disease inter-professional teaching clinic in a rural town and renal dialysis being delivered locally to an Aboriginal community. The growing trend of policy makers decentralising health funding, planning and accountability and rising health system costs increase the future utility of this approach. This type of planning can also assist the new PHNs to commission health services

  15. NRC safety research in support of regulation. Volume 8, FY 1993

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    This report, the ninth in a series of annual reports, was prepared in response to congressional inquiries concerning how nuclear regulatory research is used. It summarizes the accomplishments of the Office of Nuclear Regulatory Research during FY 1993. A special emphasis on accomplishments in nuclear power plant aging research reflects recognition that number of plants are entering the final portion of their original 40-year operating licenses and that, in addition to current aging effects, a focus on safety considerations for license renewal becomes timely. The primary purpose of performing regulatory research is to develop and provide the Commission and its staff with sound technical bases for regulatory decisions on the safe operation of licensed nuclear reactors and facilities, to find unknown or unexpected safety problems, and to develop data and related information for the purpose of revising the Commission`s rules, regulatory guides, or other guidance.

  16. Public education and enforcement research study (PEERS).

    Science.gov (United States)

    2013-08-01

    In 2001, the Federal Railroad Administration (FRA) and the Illinois Commerce Commission (ICC) established the Public Education and Enforcement Research Study (PEERS) to test the effectiveness of various education and enforcement (E&E) techniques to i...

  17. Commission on Sustainable Development. Report on the ninth session (5 May 2000 and 16-27 April 2001)

    International Nuclear Information System (INIS)

    2001-01-01

    This report contains the draft decision recommended by the Commission to be adopted by the Council. Matters brought to the attention of the Council adopted by the Commission were as fallows: energy for sustainable development; protection of the atmosphere; transport; information and decision making; international cooperation foe an enabling environment; draft program budget for the biennium 2002-2002 for the Division for Sustainable development of the Department of Economic and Social affairs. Key issues concerned with energy problems mentioned were: accessibility of energy; energy efficiency; renewable energy; advanced fossil fuel technologies; nuclear energy technologies; rural energy; energy and transport; research and development; capacity building; technology transfer; information sharing and dissemination; financial resources; making markets work effectively for sustainable development; multi-stake holder approach and public participation; regional and international cooperation

  18. Commissioning of long subsea pipelines - environmental aspects

    International Nuclear Information System (INIS)

    Falck, C.; Kleppe, T.; Maribu, J.

    1997-01-01

    Discharges to air and sea are inevitable during precommissioning and commissioning of long subsea pipelines. Large quantities of water is pumped through the pipeline during these operations. This water is normally treated with corrosion inhibiting chemicals to minimise internal corrosion of the pipeline. Chemicals like methanol or glycol may be used to prevent hydrate formation, and will normally be discharged to sea during commissioning. In order to minimise the environmental impact of these operations, while maintaining corrosion protection, the Norwegian Statoil has been working for several years along three main routes such as to develop concepts and methods that minimise the discharged volumes, the use of the most environmentally friendly chemicals available, and to monitor and identify the effects of discharges to various marine species. 3 refs., 4 figs

  19. Nine centuries waiting: The experiences of Iranians surrogacy commissioning mothers.

    Science.gov (United States)

    Zandi, Mitra; Vanaki, Zohreh; Shiva, Marziyeh; Mohammadi, Eesa

    2014-05-01

    There are a few studies about commissioning mothers' understanding from the surrogacy during 9 months of waiting for delivery in Iran and other countries. This study was conducted with an aim to explore and explain the nature of concerns (experiences) of commissioning mothers. A qualitative design with a conventional content analysis approach was used to gather and analyze the experiences of commissioning mothers. They were selected from Royan Research Centre and other infertility centers in Iran. After purposive sampling for the selection of the participants, unstructured interviews were held for data collection. Twenty-four unstructured interviews were conducted with 12 commissioning mothers, 2 surrogate mothers, and 2 infertility center social workers who directly and continuously dealt with these mothers. TWO MAIN THEMES EMERGED FROM THE DATA ANALYSIS: 1. cultural dilemma (consisting of three subthemes: Social taboo, concerns about disclosure to others and the child, concerns about altering maternal and child's identity, and 2. uncertain waiting (consisting of three subthemes: Concerns about health of fetus and surrogate, concerns about an unfamiliar surrogate, and concerns about lack of preparation for maternal role). The study reveals the importance of maternal emotional care in this group and introduces a new arena for nurses' activity. These findings help the mothers by nurses' activities in health care clinics and anywhere they deliver nursing care.

  20. Nine centuries waiting: The experiences of Iranians surrogacy commissioning mothers

    Science.gov (United States)

    Zandi, Mitra; Vanaki, Zohreh; Shiva, Marziyeh; Mohammadi, Eesa

    2014-01-01

    Background: There are a few studies about commissioning mothers’ understanding from the surrogacy during 9 months of waiting for delivery in Iran and other countries. This study was conducted with an aim to explore and explain the nature of concerns (experiences) of commissioning mothers. Materials and Methods: A qualitative design with a conventional content analysis approach was used to gather and analyze the experiences of commissioning mothers. They were selected from Royan Research Centre and other infertility centers in Iran. After purposive sampling for the selection of the participants, unstructured interviews were held for data collection. Twenty-four unstructured interviews were conducted with 12 commissioning mothers, 2 surrogate mothers, and 2 infertility center social workers who directly and continuously dealt with these mothers. Results: Two main themes emerged from the data analysis: 1. cultural dilemma (consisting of three subthemes: Social taboo, concerns about disclosure to others and the child, concerns about altering maternal and child's identity, and 2. uncertain waiting (consisting of three subthemes: Concerns about health of fetus and surrogate, concerns about an unfamiliar surrogate, and concerns about lack of preparation for maternal role). Conclusions: The study reveals the importance of maternal emotional care in this group and introduces a new arena for nurses’ activity. These findings help the mothers by nurses’ activities in health care clinics and anywhere they deliver nursing care. PMID:24949058

  1. US Nuclear Regulatory Commission annual report, 1985. Volume 2

    International Nuclear Information System (INIS)

    1986-01-01

    The decisions and actions of the Nuclear Regulatory Commission (NRC) during fiscal year 1985 are reported. Areas covered include reactor regulation, cleanup at Three Mile Island, analysis and evaluation of operational experience, nuclear materials, waste management, safeguards, inspection, enforcement, quality assurance, emergency preparedness, and nuclear regulatory research. Also, cooperation with the states, international programs, proceedings and litigation, and management are discussed

  2. Commission on Social Security

    CERN Multimedia

    Staff Association

    2010-01-01

    A commission studying past, present, and future social stakes ! For many years we have been hearing about the problems of funding of health insurance benefits in our different Member States. At CERN we are not totally immune from this problem.  To start with, let us recall that we have a mutual-benefit scheme which covers everyone for the consequences of the uncertainties in life (illness and accidents). The rules of our scheme are established by CERN in the framework of a sub-group of the Standing Concertation Committee, the CERN Health Insurance Scheme Board (CHISB), which is also in charge of managing the scheme.  The work of the “ProtSoc” (Protection Sociale – Social Security) commission, as we like to call it at the Staff Association, is to help your representatives on the CHISB, by preparing together with them the subjects and positions to be put forward and defended. This commission, which groups together the staff delegates who wish to invest their ...

  3. A Practical Guide for Commissioning Existing Buildings

    Energy Technology Data Exchange (ETDEWEB)

    Haasl, T.

    1999-05-11

    Although this guide focuses on the retrocommissioning process and its advantages, all three types of commissioning--retrocommissioning, commissioning, and recommissioning--play an equally important role in ensuring that buildings perform efficiently and provide comfortable, safe, and productive work environments for owners and occupants. For new construction and retrofit projects, commissioning should be incorporated early, during design, and last throughout the length of the project. For buildings that were never commissioned, the retrocommissioning process can yield a wealth of cost-saving opportunities while enhancing a building's environment. Finally, once a building is commissioned or retrocommissioned, incorporating recommissioning into the organization's O and M program (by periodically reapplying the original diagnostic testing and checklist procedures) helps ensure that cost savings and other benefits gained from the original process persist over time.

  4. A Practical Guide for Commissioning Existing Buildings

    Energy Technology Data Exchange (ETDEWEB)

    Haasl, T.; Sharp, T.

    1999-04-01

    Although this guide focuses on the retrocommissioning process and its advantages, all three types of commissioning--retrocommissioning, commissioning, and recommissioning--play an equally important role in ensuring that buildings perform efficiently and provide comfortable, safe, and productive work environments for owners and occupants. For new construction and retrofit projects, commissioning should be incorporated early, during design, and last throughout the length of the project. For buildings that were never commissioned, the retrocommissioning process can yield a wealth of cost-saving opportunities while enhancing a building's environment. Finally, once a building is commissioned or retrocommissioned, incorporating recommissioning into the organization's O and M program (by periodically reapplying the original diagnostic testing and checklist procedures) helps ensure that cost savings and other benefits gained from the original process persist over time.

  5. The commissioning of nuclear power plants

    International Nuclear Information System (INIS)

    1989-09-01

    The objectives and requirements to be met in commissioning nuclear power plants are presented. The objective of commissioning is to ensure that each component, subsystem, system, or structure in a plant will be capable of fulfilling its design requirements throughout its design life. The requirements for commissioning are: the preparation of a detailed, comprehensive, documented program to demonstrate that all components, systems and structures relevant to safety meet design intent; documented evidence that safety systems are fully operable and can meet design requirements; and, appropriate documentation of the actual state or behaviour of all components, systems and structures relevant to safety. All systems must be included in the commissioning program. Whenever possible, full safety system test should be performed. If a full system in situ test is not possible, alternative means are suggested. (8 refs.)

  6. Radiation Protection Institute,Ghana Atomic Energy Commission: Annual Report 2014

    International Nuclear Information System (INIS)

    2014-01-01

    The Radiation Protection Institute of the Ghana Atomic Energy Commission was established to provide scientific and technical support for executing the operational functions of the Radiation Protection Board. The 2014 Annual Report highlights the operational activities of Institutes. Also presented is a list of research projects, publications and abstracts of technical reports.

  7. Safety Culture Evaluation at Research Reactors of Pakistan Atomic Energy Commission

    International Nuclear Information System (INIS)

    Qamar, M.A.; Saeed, A.; Shah, J.H.

    2016-01-01

    The concept of safety culture was presented by IAEA in document INSAG-4 (1991), delineated as “assembly of characteristics and attitudes in organizations and individuals which establish that, as an overriding priority, nuclear plant safety issues receive the attention warranted by their significance”. The purpose of this paper is to describe the evaluation of safety culture at research reactors of the Pakistan Atomic Energy Commission (PAEC). Evaluating the safety culture of a particular organization poses some challenges which can be resolved by using safety culture evaluation models like those of Sachein (1992) and Harber-Barrier(1998). In PAEC, safety culture is the integral part of management system which not only promotes safety culture throughout the organization but also enhances its significance. To strengthen the safety culture, PAEC is also participating in a number of international and regional meetings of IAEA regarding safety culture. PAEC and the national regulator Pakistan Nuclear Regulatory Authority (PNRA) are also arranging workshops, peer reviews, sharing operational experiences and interacting with IAEA missions to enhance its capabilities in the field of safety culture. The Directorate General of Safety (DOS) is a corporate office of PAEC for safety and regulatory matters. DOS is in the process of implementing a program to evaluate safety culture at nuclear installations of PAEC to ensure that safety culture is included as a vital segment of the Integral Management System of the establishment. In this regard, training sessions and lectures on safety culture evaluation are normally conducted in PAEC for awareness and enhancement of the safety culture program. Safety culture is also addressed in PNRA Regulations like PAK-909 and PAK-913. In this paper we will focus on the safety culture evaluation in our research reactors, i.e., PARR-1 and PARR-2. The evaluation results will be based on observations, interviews of employees, group discussions

  8. Reactor aging research. United States Nuclear Regulatory Commission

    International Nuclear Information System (INIS)

    Vassilaros, M.G.

    1998-01-01

    The reactor ageing research activities in USA described, are focused on the research of reactor vessel integrity, including regulatory issues and technical aspects. Current emphasis are described for fracture analysis, embrittlement research, inspection capabilities, validation od annealing rule, revision of regulatory guide

  9. The role of the Joint Research Centre from the European Commission in the European Structural Integrity Networks AMES, ENIQ and NESC

    International Nuclear Information System (INIS)

    Estorff, U. von; Torronen, K.

    1999-01-01

    Due to the reduction in many countries of the research budget for nuclear safety several European institutions and organisations and the Institute for Advanced Materials (IAM) of the Joint Research Centre (JRC) of the European Commission (EC) have developed co-operative programmes now organised into 'Networks' for mutual benefit. They include utilities, engineering companies, research and development (R and D) laboratories and regulatory bodies. These Networks are all organised and managed in a similar way, i.e. like the successful Programme for the Inspection of Steel Components (PISC). The IAM plays the role of Operating Agent, Reference Laboratory and Network Manager of these Networks: European Network on Ageing Materials Evaluation and Studies (AMES), European Network for Inspection Qualification (ENIQ) and Network for Evaluating Steel Components (NESC), each of them dealing with a specific aspect of fitness for purpose of materials in structural components. This article will describe how the network organisation works, which was the positive experience from the past, why the networks are a tool for integrating fragmented research in Europe and how they fit into the mission of the JRC and therefore follow the EC policy. (orig.)

  10. The Spallation Neutron Source Beam Commissioning and Initial Operations

    Energy Technology Data Exchange (ETDEWEB)

    Henderson, Stuart [Argonne National Lab. (ANL), Argonne, IL (United States); Aleksandrov, Alexander V. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Allen, Christopher K. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Assadi, Saeed [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Bartoski, Dirk [University of Texas, Houston, TX (United States). Anderson Cancer Center; Blokland, Willem [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Casagrande, F. [Michigan State Univ., East Lansing, MI (United States); Campisi, I. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Chu, C. [Michigan State Univ., East Lansing, MI (United States); Cousineau, Sarah M. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Crofford, Mark T. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Danilov, Viatcheslav [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Deibele, Craig E. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Dodson, George W. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Feshenko, A. [Inst. for Nuclear Research (INR), Moscow (Russian Federation); Galambos, John D. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Han, Baoxi [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Hardek, T. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Holmes, Jeffrey A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Holtkamp, N. [SLAC National Accelerator Lab., Menlo Park, CA (United States); Howell, Matthew P. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Jeon, D. [Inst. for Basic Science, Daejeon (Korea); Kang, Yoon W. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Kasemir, Kay [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Kim, Sang-Ho [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Kravchuk, L. [Institute for Nuclear Research (INR), Moscow (Russian Federation); Long, Cary D. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); McManamy, T. [McManamy Consulting, Inc., Middlesex, MA (United States); Pelaia, II, Tom [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Piller, Chip [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Plum, Michael A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Pogge, James R. [Tennessee Technological Univ., Cookeville, TN (United States); Purcell, John David [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Shea, T. [European Spallation Source, Lund (Sweden); Shishlo, Andrei P [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Sibley, C. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Stockli, Martin P. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Stout, D. [Michigan State Univ., East Lansing, MI (United States); Tanke, E. [European Spallation Source, Lund (Sweden); Welton, Robert F [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Zhang, Y. [Michigan State Univ., East Lansing, MI (United States); Zhukov, Alexander P [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2015-09-01

    The Spallation Neutron Source (SNS) accelerator delivers a one mega-Watt beam to a mercury target to produce neutrons used for neutron scattering materials research. It delivers ~ 1 GeV protons in short (< 1 us) pulses at 60 Hz. At an average power of ~ one mega-Watt, it is the highest-powered pulsed proton accelerator. The accelerator includes the first use of superconducting RF acceleration for a pulsed protons at this energy. The storage ring used to create the short time structure has record peak particle per pulse intensity. Beam commissioning took place in a staged manner during the construction phase of SNS. After the construction, neutron production operations began within a few months, and one mega-Watt operation was achieved within three years. The methods used to commission the beam and the experiences during initial operation are discussed.

  11. Perceptions and misconceptions regarding the Joint Commission's view of quality monitoring.

    Science.gov (United States)

    Patterson, C H

    1989-10-01

    The Joint Commission recently has revised its hospital standards for infection control to reflect more accurately current state-of-the-art practices. In addition, the Joint Commission's Agenda for Change initiatives include the development of clinical indicators; one of the topics that will be included in those clinical indicator sets will be infection control. How the hospital chooses to organize itself to conduct the historically required monitoring and evaluation of clinical patient care currently required by the standards of the Joint Commission is at the option of the hospital. How the hospital will organize and collect data specific to infection control indicators yet to be developed by the Joint Commission has not been determined and will not be defined until specific research and development projects are completed. The hospital is expected to have in place infection prevention, surveillance, and control programs; it also is expected to have in place a quality assurance program that focuses not only on solving identified problems but also on the improvement of patient care quality. How the hospitals organize and/or integrate these activities is also at its option. It is expected that qualified professionals will direct and enforce infection prevention, surveillance, and control practices; indicators for infection control can provide data that will help assess the relative success of those practices and activities. The Joint Commission is not developing the capability to judge, on its own part, the actual quality of care provided by an organization seeking accreditation. Rather, the Joint Commission is committed to developing more accurate means to evaluate the structures, processes, and outcomes of diagnosis and treatment activities, as well as their interrelationships. Clinical excellence is supported by quality in the organizational environment and the managerial and leadership contexts within which patient care is delivered. Both clinical and

  12. Improving the utility and effectiveness of the standing consultative commission

    International Nuclear Information System (INIS)

    Graybeal, S.N.; Krepon, M.

    1988-01-01

    The Standing Consultative Commission has been an indispensable channel of communication between the superpowers over SALT implementation and compliance. Other channels could have been used for these purposes, but none would have been as ideally suited, or specifically authorized to do so. If something like the SCC did not exist, it would have to be created. In recent years, the SCC has not been a forum of productive exchanges, its jurisdiction has been narrowed, and its reputation tarnished. Nevertheless, new bilateral arms reduction agreements will require effective consultation if they are to be implemented properly and with a minimum of compliance problems. Important lessons can be learned from the experience of the SCC, whether this body is strenghened or new mechanisms are created to perform similar functions for new agreements. The guidelines presented here can help minimize treaty implementation and compliance problems. No suggestions will be of much value, however, if the United States and Soviet Union are ambivalent about affirming the objectives and purposes of past agreements. During periods of strained political relations, negotiations over new agreements rarely proceed smoothly. While the SCC has been somewhat more insulated from the ups and downs of superpower relations, it clearly has not been immune from them. But when political relations between negotiating partners deteriorate to the point where intentions toward existing treaty obligations are called into question, no bilateral compliance mechanism can serve as an effective, problem-solving forum

  13. Good research practices for comparative effectiveness research: approaches to mitigate bias and confounding in the design of nonrandomized studies of treatment effects using secondary data sources: the International Society for Pharmacoeconomics and Outcomes Research Good Research Practices for Retrospective Database Analysis Task Force Report--Part II.

    Science.gov (United States)

    Cox, Emily; Martin, Bradley C; Van Staa, Tjeerd; Garbe, Edeltraut; Siebert, Uwe; Johnson, Michael L

    2009-01-01

    The goal of comparative effectiveness analysis is to examine the relationship between two variables, treatment, or exposure and effectiveness or outcome. Unlike data obtained through randomized controlled trials, researchers face greater challenges with causal inference with observational studies. Recognizing these challenges, a task force was formed to develop a guidance document on methodological approaches to addresses these biases. The task force was commissioned and a Chair was selected by the International Society for Pharmacoeconomics and Outcomes Research Board of Directors in October 2007. This report, the second of three reported in this issue of the Journal, discusses the inherent biases when using secondary data sources for comparative effectiveness analysis and provides methodological recommendations to help mitigate these biases. The task force report provides recommendations and tools for researchers to mitigate threats to validity from bias and confounding in measurement of exposure and outcome. Recommendations on design of study included: the need for data analysis plan with causal diagrams; detailed attention to classification bias in definition of exposure and clinical outcome; careful and appropriate use of restriction; extreme care to identify and control for confounding factors, including time-dependent confounding. Design of nonrandomized studies of comparative effectiveness face several daunting issues, including measurement of exposure and outcome challenged by misclassification and confounding. Use of causal diagrams and restriction are two techniques that can improve the theoretical basis for analyzing treatment effects in study populations of more homogeneity, with reduced loss of generalizability.

  14. Radioactive Waste Treatment and Conditioning Using Plasma Technology Pilot Plant: Testing and Commissioning

    International Nuclear Information System (INIS)

    Rafizi Salihuddin; Rohyiza Baan; Norasalwa Zakaria

    2016-01-01

    Plasma pilot plant was commissioned for research and development program on radioactive waste treatment. The plant is equipped with a 50 kW direct current of non-transferred arc plasma torch which mounted vertically on top of the combustion chamber. The plant also consists of a dual function chamber, a water cooling system, a compress air supply system and a control system. This paper devoted the outcome after testing and commissioning of the plant. The problems arise was discussed in order to find the possible suggestion to overcome the issues. (author)

  15. Alberta Petroleum Marketing Commission annual report, 1993

    International Nuclear Information System (INIS)

    1994-05-01

    The Alberta Petroleum Marketing Commission has the responsibility of selling the Crown's royalty share of Alberta's crude and synthetic oil production; similar services are provided for natural gas. The Commission also markets crude oil on behalf of producers to North American and offshore consumers. The Commission's position as the largest crude oil marketer in Canada enables it to provide analyses of industry pricing and marketing trends to the Alberta government. 1993 marked the last full year of the Commission operating as Alberta's representative in the energy regulatory arena in Canada and the USA; due to restructuring, these functions will be transferred to the Ministry of Energy in early 1994. A brief overview is presented of crude oil markets in Canada and the USA. The Commission's receipts of light and medium royalty oil totalled 40.2 million bbl, down 11% from 1992, and receipts of heavy crude were 3.7 million bbl, down 42% from 1992. Revenue from crude oil sales was $800 million, down 25% from 1992. The Commission's natural gas activities in 1993 included price determination and information collection. 4 figs., 3 tabs

  16. 77 FR 4720 - Appeal Proceedings Before the Commission

    Science.gov (United States)

    2012-01-31

    ... promotes clarity and effectiveness for the regulated community. Proposed subchapter H consists of six parts... Commission and staff turnover and the impact of such turnover on how appeals are handled and decided. This commenter argued that turnover leads to inconsistent outcomes. First, the terms of Commissioners are for a...

  17. Sixth Semiannual Report of the Commission to the Congress: Atomic Energy and the Life Sciences, July 1949

    Energy Technology Data Exchange (ETDEWEB)

    Lilienthal, David E.; Bacher, Robert F.; Pike, Sumner T.; Strauss, Lewis L.

    1949-07-01

    The document represents the sixth semiannual Atomic Energy Commission (AEC) report to Congress. The report sums up briefly the major developments in the national atomic energy program and further gives a comprehensive review of one of its major phases -- the biological and medical activities. It outlines the AEC program in all phases of medicine and biology, reviews research results and projects under way, reports what is known of the effects of radiation on man and other living things, and surveys the benefits which may be derived from the use of radiation for diagnosis and treatment of disease and for the study of plants and animals. Since radiation from atomic sources also is potentially harmful to all living things, the Commission has set up safeguards for all who might, without such protection, be exposed to harmful radiation.

  18. Commissioning MMS: Challenges and Lessons Learned

    Science.gov (United States)

    Wood, Paul; Gramling, Cheryl; Reiter, Jennifer; Smith, Patrick; Stone, John

    2016-01-01

    This paper discusses commissioning of NASA's Magnetospheric MultiScale (MMS) Mission. The mission includes four identical spacecraft with a large, complex set of instrumentation. The planning for and execution of commissioning for this mission is described. The paper concludes by discussing lessons learned.

  19. 75 FR 81244 - Military Leadership Diversity Commission Meeting

    Science.gov (United States)

    2010-12-27

    ... DEPARTMENT OF DEFENSE Office of the Secretary Military Leadership Diversity Commission Meeting... will take place: 1. Name of Committee: Military Leadership Diversity Commission (MLDC). 2. Date... Military Leadership Diversity Commission to continue their efforts to address congressional concerns as...

  20. Jules Horowitz Reactor: Organisation for the Preparation of the Commissioning Phase and Normal Operation

    Energy Technology Data Exchange (ETDEWEB)

    Estrade, J.; Fabre, J. L.; Marcille, O. [French Alternative Energies end Atomic Energy Commission, Provence (France)

    2013-07-01

    The Jules Horowitz Reactor (JHR) is a new modern Material Testing Reactor (MTR) currently under construction at CEA Cadarache research centre in the south of France. It will be a major research facility in support to the development and the qualification of materials and fuels under irradiation with sizes and environment conditions relevant for nuclear power plants in order to optimise and demonstrate safe operations of existing power reactors as well as to support future reactors design. It will represent also an important research infrastructure for scientific studies dealing with material and fuel behaviour under irradiation. The JHR will contribute also to secure the production of radioisotope for medical application. This is a key public health stake. The construction of JHR which started in 2007 is going-on with target of commissioning by the end of 2017. The design of the reactor provides modern experimental capacity in support to R and D programs for the nuclear energy for the next 60 years. In parallel to the facility construction, the preparation of the future staff and of the organisation to operate the reactor safely, reliably and efficiently is an important issue. In this framework, many actions are in progress to elaborate: Ο the staffing and the organisational structure for the commissioning test phases and also for normal operation, Ο the documentation in support to the reactor operation (safety analysis report, general operating rules, procedures, instructions, ···), Ο the maintenance, in service and periodic test programs, Ο staff training programs by using dedicated facilities (simulator, ···) Ο commissioning test programs for ensuring that the layout of systems and subcomponents is completed in accordance with the design requirements, the specification performances and the safety criteria. These commissioning tests will also be helpful for transferring the knowledge on the installed systems to the operating group. This paper gives the

  1. NRC safety research in support of regulation

    International Nuclear Information System (INIS)

    1994-06-01

    This report, the ninth in a series of annual reports, was prepared in response to congressional inquiries concerning how nuclear regulatory research is used. It summarizes the accomplishments of the Office of Nuclear Regulatory Research during FY 1993. A special emphasis on accomplishments in nuclear power plant aging research reflects recognition that number of plants are entering the final portion of their original 40-year operating licenses and that, in addition to current aging effects, a focus on safety considerations for license renewal becomes timely. The primary purpose of performing regulatory research is to develop and provide the Commission and its staff with sound technical bases for regulatory decisions on the safe operation of licensed nuclear reactors and facilities, to find unknown or unexpected safety problems, and to develop data and related information for the purpose of revising the Commission's rules, regulatory guides, or other guidance

  2. STUK research projects 1998-2000

    International Nuclear Information System (INIS)

    Salomaa, S.; Eloranta, E.; Heimbuerger, H.; Jokela, K.; Jaervinen, H.

    1998-07-01

    The primary goal of STUK, the Finnish Radiation and Nuclear Safety Authority, is to prevent and limit the harmful effects of radiation. The research conducted by STUK yields new information related to the use, occurrence and effects of radiation and promotes the supervision of nuclear safety. STUK research projects 1998 - 2000 summarizes STUK's own research projects and commissioned research designed to promote the supervision of nuclear safety. Information on the research projects and related publications is also available on STUK's WWW pages at www.stuk.fi. The work done on the safe use of nuclear power and nuclear waste management mainly comprises commissioned research projects which derive from the needs of authorities, and are funded and directed by STUK. This research is conducted by organizations outside STUK, but supervised by STUK experts. In some cases, STUK personnel are also involved. The goal of this research work is to produce the information needed for decision-making, to develop supervisory methods and to ensure that recent developments in science and technology are taken into account in action to promote safe use of nuclear power. STUK's own research focuses on radiation protection and the health effects of radiation. During 1998 - 2000, the main emphasis will be on projects supporting the Finnish national environmental health action plan, the health risks of radiation, emergency preparedness and cooperation with neighbouring CEE areas. EU directives on radiation protection and medical exposure to radiation also influence the course taken by research carried out at STUK. STUK's research activities are now more international than ever; the institute is involved in more then 20 research projects funded by EU. Apart from the EU and the Nordic countries, STUK's main partners are to be found in Russia, Estonia and the USA. (orig.)

  3. Managing resources in NHS dentistry: using health economics to inform commissioning decisions

    Directory of Open Access Journals (Sweden)

    Exley Catherine E

    2011-05-01

    Full Text Available Abstract Background The aim of this study is to develop, apply and evaluate an economics-based framework to assist commissioners in their management of finite resources for local dental services. In April 2006, Primary Care Trusts in England were charged with managing finite dental budgets for the first time, yet several independent reports have since criticised the variability in commissioning skills within these organisations. The study will explore the views of stakeholders (dentists, patients and commissioners regarding priority setting and the criteria used for decision-making and resource allocation. Two inter-related case studies will explore the dental commissioning and resource allocation processes through the application of a pragmatic economics-based framework known as Programme Budgeting and Marginal Analysis. Methods/Design The study will adopt an action research approach. Qualitative methods including semi-structured interviews, focus groups, field notes and document analysis will record the views of participants and their involvement in the research process. The first case study will be based within a Primary Care Trust where mixed methods will record the views of dentists, patients and dental commissioners on issues, priorities and processes associated with managing local dental services. A Programme Budgeting and Marginal Analysis framework will be applied to determine the potential value of economic principles to the decision-making process. A further case study will be conducted in a secondary care dental teaching hospital using the same approach. Qualitative data will be analysed using thematic analysis and managed using a framework approach. Discussion The recent announcement by government regarding the proposed abolition of Primary Care Trusts may pose challenges for the research team regarding their engagement with the research study. However, whichever commissioning organisations are responsible for resource allocation

  4. Official communication of the Safety Commission

    CERN Multimedia

    DG Unit

    2009-01-01

    The Prevention and Training section of the Safety Commission, would like to inform you that the new Safety Awareness course for newcomers will replace the welcome video in building 55 as of 2 April. The 3 levels (‘Safety at CERN’, ‘General Risks’ and ‘Specific Risks’) followed by 3 tests will determine access to CERN. Thanks to the SIR (Safety Information Registration, http://sir.cern.ch) application, it will be possible for you to follow the awareness course from your computer. For more information, go to the Safety Commission web site: http://safety-commission.web.cern.ch

  5. Official communication of the Safety Commission

    CERN Multimedia

    DG Unit

    2009-01-01

    We, the Prevention and Training section of the Safety Commission, would like to inform you that the new Safety Awareness course for newcomers will replace the welcome video in building 55 as of the 2nd April. The 3 levels (‘Safety at CERN’, ‘General Risks’ and ‘Specific Risks’) followed by 3 tests will determine access to CERN. Thanks to the SIR (Safety Information Registration, http://sir.cern.ch) application, it will be possible for you to follow the awareness course from your computer. For more information, go to the Safety Commission web site: http://safety-commission.web.cern.ch

  6. 77 FR 3752 - Commission Information Collection Activities (FERC-725I); Comment Request

    Science.gov (United States)

    2012-01-25

    ... accounting for double counting, the net number of entities responding will be approximately 167 entities... rule. The record retention cost comes from Commission staff research on record retention requirements... the collection of information, including the validity of the methodology and assumptions used; (3...

  7. International Commission on Radiological Protection. History, policies, procedures

    International Nuclear Information System (INIS)

    Lindell, Bo; Dunster, H.J.; Valentin, Jack; )

    2000-01-01

    This report briefly reviews the history, mode of operation, concepts, and current policies of the International Commission on Radiological Protection (ICRP). It touches upon the objectives of the Commission's recommendations, the quantities used, the biological basis of the Commission's policy, the quantitative basis for its risk estimates, the structure of the system of protection, some problems of interpretation and application in that system, and the need for stability, consistency, and clarity in the Commission's recommendations. (author)

  8. Alberta Petroleum Marketing Commission annual report, 1992

    International Nuclear Information System (INIS)

    1993-05-01

    The Alberta Petroleum Marketing Commission has the responsibility of selling the Crown's royalty share of Alberta's crude and synthetic oil production; similar services are provided for natural gas. The Commission also markets crude oil on behalf of producers to North American and offshore consumers. The Commission's position as the largest crude oil marketeer in Canada enables it to provide analyses of industry pricing and marketing trends to the Alberta government. 1992 marked the end of chronically depressed natural gas prices and a significant reduction in natural gas surpluses. A brief overview is presented of crude oil markets in Canada and the USA. The Commission's receipts of light and medium royalty oil totalled 45.3 million bbl, unchanged from 1991, and receipts of heavy crude were 6.3 million bbl, up 4% from 1991. Revenue from crude oil sales was $1.1 billion, down from $1.64 billion in 1991. The Commission's natural gas activities in 1992 included price determination and information collection. 9 figs., 1 tab

  9. Nuclear Regulatory Commission: 1981 annual report

    International Nuclear Information System (INIS)

    1981-01-01

    This seventh annual report of the US Nuclear Regulatory Commission covers major actions, events and planning that occurred during fiscal year 1981, with some coverage of later events, where appropriate. Chapters of the report address the agency's various functions or areas of activity: regulating nuclear power plants; evaluating reactor operating experience; licensing nuclear materials and their transportation; safeguarding nuclear plants and materials; managing nuclear wastes; inspection and enforcement; cooperation with state governments; international activities; research and standards development; hearings; decisions and litigation; and administrative and public communications matters. Each chapter presents a detailed review of program accomplishments during the report period, fiscal year 1981

  10. How are clinical commissioning groups managing conflicts of interest under primary care co-commissioning in England? A qualitative analysis.

    Science.gov (United States)

    Moran, Valerie; Allen, Pauline; McDermott, Imelda; Checkland, Kath; Warwick-Giles, Lynsey; Gore, Oz; Bramwell, Donna; Coleman, Anna

    2017-11-08

    From April 2015, NHS England (NHSE) started to devolve responsibility for commissioning primary care services to clinical commissioning groups (CCGs). The aim of this paper is to explore how CCGs are managing potential conflicts of interest associated with groups of GPs commissioning themselves or their practices to provide services. We carried out two telephone surveys using a sample of CCGs. We also used a qualitative case study approach and collected data using interviews and meeting observations in four sites (CCGs). We conducted 57 telephone interviews and 42 face-to-face interviews with general practitioners (GPs) and CCG staff involved in primary care co-commissioning and observed 74 meetings of CCG committees responsible for primary care co-commissioning. Conflicts of interest were seen as an inevitable consequence of CCGs commissioning primary care. Particular problems arose with obtaining unbiased clinical input for new incentive schemes and providing support to GP provider federations. Participants in meetings concerning primary care co-commissioning declared conflicts of interest at the outset of meetings. Different approaches were pursued regarding GPs involvement in subsequent discussions and decisions with inconsistency in the exclusion of GPs from meetings. CCG senior management felt confident that the new governance structures and policies dealt adequately with conflicts of interest, but we found these arrangements face limitations. While the revised NHSE statutory guidance on managing conflicts of interest (2016) was seen as an improvement on the original (2014), there still remained some confusion over various terms and concepts contained therein. Devolving responsibility for primary care co-commissioning to CCGs created a structural conflict of interest. The NHSE statutory guidance should be refined and clarified so that CCGs can properly manage conflicts of interest. Non-clinician members of committees involved in commissioning primary care

  11. Status of Nuclear Activities of Bangladesh Atomic Energy Commission

    Energy Technology Data Exchange (ETDEWEB)

    Begum, Zakia [Planning and Development, Bangladesh Atomic Energy Commission - BAEC, Paramanu Bhaban, E 12/A, Agargoan, 01207 Shere Banglanagar, Dhaka (Bangladesh)

    2008-07-01

    Bangladesh Atomic Energy Commission (BAEC) is the national authority for acquisition, development and application of Nuclear Science and Technology and thus is playing the pioneering role for the development of the country's nuclear research programmes and thus helping to achieve the cherished goal of self-reliance through national efforts and international co-operation. Being firmly committed to the peaceful uses of Atomic Energy, programmes have been undertaken in Physical Sciences, Biological Sciences, Engineering and Nuclear Power Sector by Bangladesh Atomic Energy Commission and some of the results have been transferred from laboratories to hospitals, agriculture, industries and environment for practical applications. In spite of some major constrains, presently BAEC's activities have increased many folds and keeping in view of the overall power crisis of the country efforts have also been given to establish Nuclear Power Plant in the country. (author)

  12. 77 FR 8095 - Technical Corrections to Commission Regulations

    Science.gov (United States)

    2012-02-14

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission 18 CFR Part 2 [Docket No. RM11-30-000; Order No. 756] Technical Corrections to Commission Regulations Issued February 8, 2012. AGENCY: Federal Energy Regulatory Commission, DOE. ACTION: Final rule: correcting amendment. SUMMARY: This document adds...

  13. Report of the Nevada Commission on Nuclear Projects

    International Nuclear Information System (INIS)

    1986-11-01

    This summary represents the major conclusions reached by the Commission on Nuclear Projects. They reflect the Commission's experience with the high-level nuclear waste disposal program since 1985 and are the result of the Commission's scrutiny of both State and federal repository-related activities

  14. 18 CFR 388.104 - Informal advice from Commission staff.

    Science.gov (United States)

    2010-04-01

    ... Commission staff. 388.104 Section 388.104 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... Commission staff. (a) The Commission staff provides informal advice and assistance to the general public and... expressed by the staff do not represent the official views of the Commission, but are designed to aid the...

  15. The European Commission's light bulb decree: Another costly regulation?

    International Nuclear Information System (INIS)

    Frondel, Manuel; Lohmann, Steffen

    2011-01-01

    Since September 2009, Regulation 244/2009 of the European Commission enforces the gradual phase-out of incandescent light bulbs. As of September 2012, only energy-efficient lighting sources will be allowed for sale. Among these are halogen light bulbs, light-emitting diodes (LED), or compact fluorescent light bulbs-often referred to as energy-saving light bulbs. The Commission's justification for the phase-out of conventional light bulbs maintains that a reduction in the electricity consumed will not only lead to lower energy cost for private households and industrial consumers, but at the same time lead to a decrease in greenhouse gas emissions. This article discusses possible reasons for the slow market diffusion of energy-saving light bulbs and shows that the investment in energy-efficient light bulbs does not necessarily lead to significant cost reductions. Drawing on some illustrative examples, we demonstrate that the use of cheaper incandescent bulbs instead of energy-saving light bulbs can be economically rational in cases of rather low usage times, in which the higher initial purchasing price might only pay off after very long time spans. Furthermore, due to the coexistence with the European Emissions Trading Scheme (ETS), this regulation attains no additional emission reductions beyond those achieved by the ETS alone. We thus conclude that the general ban of incandescent light bulbs is inappropriate and should be abolished by the Commission. - Research highlights: → This article discusses reasons for the slow market diffusion of energy-saving light bulbs. → We show that using incandescent bulbs can be rational in cases of rather low usage times. → We conclude that the general ban of incandescent light bulbs should be abolished by the Commission.

  16. Commissioning of self-management support for people with long-term conditions: an exploration of commissioning aspirations and processes.

    Science.gov (United States)

    Reidy, Claire; Kennedy, Anne; Pope, Catherine; Ballinger, Claire; Vassilev, Ivo; Rogers, Anne

    2016-07-15

    To explore how self-management support (SMS) is considered and conceptualised by Clinical Commissioning Groups (CCGs) and whether this is reflected in strategic planning and commissioning. SMS is an essential element of long-term condition (LTC) management and CCGs are responsible for commissioning services that are coordinated, integrated and link into patient's everyday lives. This focus provides a good test and exemplar for how commissioners communicate with their local population to find out what they need. A multisite, quasi-ethnographic exploration of 9 CCGs. National Health Service (NHS) CCGs in southern England, representing varied socioeconomic status, practice sizes and rural and urban areas. Content analysis of CCG forward plans for mention of SMS. Semistructured interviews with commissioners (n=10) explored understanding of SMS and analysed thematically. The practice of commissioning explored through the observations of Service User Researchers (n=5) attending Governing Body meetings (n=10, 30 hours). Observations illuminate the relative absence of SMS and gateways to active engagement with patient and public voices. Content analysis of plans point to tensions between local aspirations and those identified by NHS England for empowering patients by enhancing SMS services ('person-centred', whole systems). Interview data highlight disparities in the process of translating the forward plans into practice. Commissioners reference SMS as a priority yet details of local initiatives are notably absent with austerity (cost-containment) and nationally measured biomedical outcomes taking precedence. Commissioners conceptualise locally sensitive SMS as a means to improve health and reduce service use, but structural and financial constraints result in prioritisation of nationally driven outcome measures and payments relating to biomedical targets. Ultimately, there is little evidence of local needs driving SMS in CCGs. CCGs need to focus more on early strategic

  17. Educational Change by Commission: Attempting "Trickle Down" Reform.

    Science.gov (United States)

    Ginsberg, Rick; Wimpelberg, Robert K.

    1987-01-01

    The processes and procedures of national commissions on education are discussed. Elements of commonality are presented with a review of competing explanations of the popularity of such commissions. A sociopolitical thesis of educational reform through commissions is advanced, based on the "trickle down" theory of economics. (SLD)

  18. 77 FR 58941 - Appeal Proceedings Before the Commission

    Science.gov (United States)

    2012-09-25

    ... forth more specific rules for the different types of appeals. Rules for appeals of ordinance..., 582, 583, 584, and 585 RIN 3141-AA47 Appeal Proceedings Before the Commission AGENCY: National Indian... Commission) promulgates this final rule to enhance and clarify appeal proceedings before the Commission. This...

  19. Statistical aspects of the program of the Atomic Bomb Casualty Commission

    Energy Technology Data Exchange (ETDEWEB)

    Beebe, G W

    1961-02-24

    The Atomic Bomb Casualty Commission (ABCC) is a medical research institute in Hiroshima and Nagasaki devoted to long term study of the late effects of nuclear radiation upon man. The work draws its great interest from the paucity of existing information on the effect of radiation on man; from the unique radiation experience of the atomic bomb survivors; from the increasing utilization of nuclear energy in modern technology; and from humanitarian concern for the survivors of the bombs. The ABCC program provides the statistician with an important opportunity to apply the tools and concepts of statistics, for the inferences to be drawn are largely statistical inferences growing out of the comparison of samples defined as to radiation exposure. The work is of international as well as statistical interest by virtue of its subject matter and as a meeting-ground for statisticians trained in different countries.

  20. Horizontal mergers and weak and strong competition commissions

    Directory of Open Access Journals (Sweden)

    Ristić Bojan

    2014-01-01

    Full Text Available In this paper we analyse the horizontal merger of companies in an already concentrated industry. The participants in mergers are obliged to submit notification to the Competition Commission but they also have the option of rejecting the merger. At the time of the notification submission the participants do not know whether the Commission is strong or weak, and they can complain to the Court if the Commission prohibits the merger. We model the strategic interaction between Participants and Commission in a dynamic game of incomplete information and determine weak perfect Bayesian equilibria. The main finding of our paper is that Participants will base their decision to submit notification on their belief in a weak Commission decision and will almost completely ignore the possibility of a strong Commission decision. We also provide a detailed examination of one case from Serbian regulatory practice, which coincides with the results of our game theoretical model.

  1. Niger Delta Development Commission and Sustainable ...

    African Journals Online (AJOL)

    Niger Delta Development Commission and Sustainable Development of Niger Delta Region of Nigeria: The Case of Rivers State. Goddey Wilson. Abstract. The study is on Niger Delta Development Commission and sustainable development of Niger Delta region of Nigeria, the case of Rivers State. The main objective of the ...

  2. Large Hadron Collider commissioning and first operation.

    Science.gov (United States)

    Myers, S

    2012-02-28

    A history of the commissioning and the very successful early operation of the Large Hadron Collider (LHC) is described. The accident that interrupted the first commissioning, its repair and the enhanced protection system put in place are fully described. The LHC beam commissioning and operational performance are reviewed for the period from 2010 to mid-2011. Preliminary plans for operation and future upgrades for the LHC are given for the short and medium term.

  3. Monitoring Based Commissioning: Benchmarking Analysis of 24 UC/CSU/IOU Projects

    Energy Technology Data Exchange (ETDEWEB)

    Mills, Evan; Mathew, Paul

    2009-04-01

    total of 1120 deficiency-intervention combinations were identified in the course of commissioning the projects described in this report. The most common location of deficiencies was in HVAC equipment (65% of sites), followed by air-handling and distributions systems (59%), cooling plant (29%), heating plants (24%), and terminal units (24%). The most common interventions were adjusting setpoints, modifying sequences of operations, calibration, and various mechanical fixes (each done in about two-thirds of the sites). The normalized rate of occurrence of deficiencies and corresponding interventions ranged from about 0.1/100ksf to 10/100ksf, depending on the issue. From these interventions flowed significant and highly cost-effective energy savings For the MBCx cohort, source energy savings of 22 kBTU/sf-year (10%) were achieved, with a range of 2% to 25%. Median electricity savings were 1.9 kWh/sf-year (9%), with a range of 1% to 17%. Peak electrical demand savings were 0.2 W/sf-year (4%), with a range of 3% to 11%. The aggregate commissioning cost for the 24 projects was $2.9 million. We observed a range of normalized costs from $0.37 to 1.62/sf, with a median value of $1.00/sf for buildings that implemented MBCx projects. Per the program design, monitoring costs as a percentage of total costs are significantly higher in MBCx projects (median value 40%) than typical commissioning projects included in the Meta-analysis (median value of 2% in the commissioning database). Half of the projects were in buildings containing complex and energy-intensive laboratory space, with higher associated costs. Median energy cost savings were $0.25/sf-year, for a median simple payback time of 2.5 years. Significant and cost-effective energy savings were thus obtained. The greatest absolute energy savings and shortest payback times were achieved in laboratory-type facilities. While impacts varied from project to project, on a portfolio basis we find MBCx to be a highly cost-effective means

  4. Research laboratories annual report 1992

    International Nuclear Information System (INIS)

    1993-07-01

    The report book presents the various research activities within the Israel Atomic Energy Commission, during 1992 calendar year. The discipline reported here are (by chapters): theoretical physics and theoretical chemistry, optics and lasers, solid states and nuclear physics, material sciences, chemistry, radiopharmaceuticals, labelled compounds and environmental studies, radiation effects, dosimetry and protection, instrumentation and techniques

  5. 17 CFR 9.26 - Participation of Commission staff.

    Science.gov (United States)

    2010-04-01

    ... 17 Commodity and Securities Exchanges 1 2010-04-01 2010-04-01 false Participation of Commission staff. 9.26 Section 9.26 Commodity and Securities Exchanges COMMODITY FUTURES TRADING COMMISSION RULES... Respect to Appeals § 9.26 Participation of Commission staff. Within twenty days after receipt of the...

  6. 32 CFR 700.873 - Inspection incident to commissioning of ships.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 5 2010-07-01 2010-07-01 false Inspection incident to commissioning of ships... Inspection incident to commissioning of ships. When a ship is to be commissioned, the authority designated to place such ship in commission shall, just prior to commissioning, cause an inspection to be made to...

  7. Permanent Commission for Health and Safety

    CERN Multimedia

    Association du personnel

    2007-01-01

    The mandate of the Staff Association's permanent commission for Health and Safety is to examine all aspects of health and safety related to the working environment at CERN. In no way does it wish to be a substitute for the official bodies that are responsible for these matters. The Commission's aim is to formulate remarks on and make proposals about these questions to the relevant bodies and the CERN Management. Its main focus is the safety of the CERN staff but it is also concerned with the safety of the installations and of the CERN environment. The Commission reports to the Staff Council and the Executive Committee of the Staff Association.

  8. Assessment report no. 1 by the National Commission for assessment of researches and studies related to the management of radioactive materials and wastes

    International Nuclear Information System (INIS)

    2007-06-01

    After a presentation of the main orientations of the Commission, this report describes the legal framework for the management of radioactive materials and wastes (long life high level and intermediate level wastes, other wastes, separation and transmutation, waste packaging), proposes an assessment of researches and studies coordinated by the ANDRA (on high and medium level wastes) and of those coordinated by the CEA (on separation and transmutation, on waste packaging and long term behaviour). It gives an overview of recent international developments in the field of nuclear waste storage (in Sweden, Finland, United-Kingdom, Canada, United States, and Belgium)

  9. Understanding utility regulation : a participants' guide to the British Columbia Utilities Commission

    International Nuclear Information System (INIS)

    1996-10-01

    Information regarding British Columbia's regulated energy industries is presented with particular emphasis on the regulatory functions of the British Columbia Utilities Commission (BCUC). The objective of providing the information is to make the regulatory process as transparent as possible and to make it easy for ratepayers to effectively and economically participate in the regulation of energy utilities. The issue of why electricity and natural gas utilities are regulated is addressed, but the greater part of the report is devoted to describing opportunities for public participation at the BCUC, explaining how to get involved in the Commission's proceedings and the nature of the hearings used by the Commission. An introduction to rate making is also presented, along with an overview of other institutions involved in energy regulation. Appendices contain the text of the Utilities Commission Act (App. A), the Negotiated Settlement Process Policy, Procedures and Guidelines (App. B), Participant Funding and Cost Awards (App. C), and the Integrated Resource Planning Guide (App. D). tabs., figs., 4 appendices

  10. Engaging GPs in commissioning: realist evaluation of the early experiences of Clinical Commissioning Groups in the English NHS.

    Science.gov (United States)

    McDermott, Imelda; Checkland, Kath; Coleman, Anna; Osipovič, Dorota; Petsoulas, Christina; Perkins, Neil

    2017-01-01

    Objectives To explore the 'added value' that general practitioners (GPs) bring to commissioning in the English NHS. We describe the experience of Clinical Commissioning Groups (CCGs) in the context of previous clinically led commissioning policy initiatives. Methods Realist evaluation. We identified the programme theories underlying the claims made about GP 'added value' in commissioning from interviews with key informants. We tested these theories against observational data from four case study sites to explore whether and how these claims were borne out in practice. Results The complexity of CCG structures means CCGs are quite different from one another with different distributions of responsibilities between the various committees. This makes it difficult to compare CCGs with one another. Greater GP involvement was important but it was not clear where and how GPs could add most value. We identified some of the mechanisms and conditions which enable CCGs to maximize the 'added value' that GPs bring to commissioning. Conclusion To maximize the value of clinical input, CCGs need to invest time and effort in preparing those involved, ensuring that they systematically gather evidence about service gaps and problems from their members, and engaging members in debate about the future shape of services.

  11. Commission of the European Communities - Activities in the field of fast reactors

    International Nuclear Information System (INIS)

    Balz, W.

    1977-01-01

    The Commission of the European Communities is performing activities in the field of fast reactor on two lines: a) activities aiming to prepare the commercialization of fast reactors by coordination and collaboration between national programmes. b) the execution of an own programme in the Joint Research Centre at Ispra (Italy) and Karlsruhe (Federal Republic of Germany) in the field of FBR safety and research on Pu-bearing fuel

  12. DESY: HERA commissioning

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    The commissioning of the world's first electron-proton collider - the 6.3 kilometre HERA ring at the DESY Laboratory in Hamburg - last year was the result of more than a decade of careful planning, design and construction

  13. Alberta Petroleum Marketing Commission annual report, 1991

    International Nuclear Information System (INIS)

    1992-04-01

    The Alberta Petroleum Marketing Commission has the responsibility of selling the Crown's royalty share of Alberta's crude and synthetic oil production; similar services are provided for natural gas. The Commission also markets crude oil on behalf of producers to North American and offshore consumers. The Commission's position as the largest crude oil marketeer in Canada enables it to provide analyses of industry pricing and marketing trends to the Alberta government. In 1991, the middle east crisis caused prices to spike at the commencement of the Gulf war, but these quickly stabilized. The Commission's receipts of light and medium royalty oil totalled 45.3 million bbl, down 1.5% from 1990, and receipts of heavy crude were 6.1 million bbl, up 5% from 1990. Revenue from crude oil sales was $1,642,244,000, down from $2,078,197,000 in 1990. Loss of the Montreal market through pipeline closure led to increased pressure on prices, particularly on heavy crudes. The Commission's natural gas activities in 1991 included price determination and information collection. 9 figs., 1 tab

  14. Preparation of physics commissioning of Mochovce units 3 and 4

    International Nuclear Information System (INIS)

    Sedlacek, M.; Chrapciak, V.

    2010-01-01

    The Project 'Mochovce Units 3 and 4 Completion' started in 2009 and it will be finished in 2013. VUJE, Inc. is one of the five main Project contractors for the Nuclear Island and it is responsible, inter alia, for Mochovce Units 3 and 4 commissioning. The commissioning of Units 3 and 4 includes the stages of Physics Commissioning and Power Commissioning. This paper deals with the preparation of Mochovce Units 3 and 4 Physics Commissioning. In the paper there is presented a preparation of some commissioning documents, e.g. 'Quality Assurance Programme', 'Commissioning Programme', 'Stage Programme for Physics Commissioning', 'Test working programmes', 'Neutron-physics characteristics for Physics and Power Commissioning', etc. The scope of Physics Commissioning is presented by list of tests. For assessment of tests results so-called three-level acceptance criteria will be applied: realization, design and safety criteria. In the paper there are also presented computer codes, which will be used for neutron-physics characteristics calculation and the fuel loading scheme for the reactor core of Mochovce Unit 3. (Authors)

  15. Incorporation of a health economic modelling tool into public health commissioning: Evidence use in a politicised context.

    Science.gov (United States)

    Sanders, Tom; Grove, Amy; Salway, Sarah; Hampshaw, Susan; Goyder, Elizabeth

    2017-08-01

    This paper explores how commissioners working in an English local government authority (LA) viewed a health economic decision tool for planning services in relation to diabetes. We conducted 15 interviews and 2 focus groups between July 2015 and February 2016, with commissioners (including public health managers, data analysts and council members). Two overlapping themes were identified explaining the obstacles and enablers of using such a tool in commissioning: a) evidence cultures, and b) system interdependency. The former highlighted the diverse evidence cultures present in the LA with politicians influenced by the 'soft' social care agendas affecting their local population and treating local opinion as evidence, whilst public health managers prioritised the scientific view of evidence informed by research. System interdependency further complicated the decision making process by recognizing interlinking with departments and other disease groups. To achieve legitimacy within the commissioning arena health economic modelling needs to function effectively in a highly politicised environment where decisions are made not only on the basis of research evidence, but on grounds of 'soft' data, personal opinion and intelligence. In this context decisions become politicised, with multiple opinions seeking a voice. The way that such decisions are negotiated and which ones establish authority is of importance. We analyse the data using Larson's (1990) discursive field concept to show how the tool becomes an object of research push and pull likely to be used instrumentally by stakeholders to advance specific agendas, not a means of informing complex decisions. In conclusion, LA decision making is underpinned by a transactional business ethic which is a further potential 'pull' mechanism for the incorporation of health economic modelling in local commissioning. Crown Copyright © 2017. Published by Elsevier Ltd. All rights reserved.

  16. New body starts independent advisory work for EU Commission

    International Nuclear Information System (INIS)

    Anon.

    1994-01-01

    The new European Science and Technology Assembly (ESTA) had its first General Assembly on 6-7 September in Brussels. According to Commissioner A. Ruberti, the European Union's 'Minister' for science, technology and higher education, who has been largely responsible for ESTA's creation, the tasks of the new and independent Assembly of Scientists are to give opinions and advice and to help the European Commission implement the EU research policy

  17. Ninth Semiannual Report of the Commission to the Congress, July - December 1950. January 1951

    Energy Technology Data Exchange (ETDEWEB)

    Dean, Gordon; Glennan, T. Keith; Murray, Thomas E.; Pike, Sumner T.; Smyth, H. D.

    1951-01-31

    The document represents the ninth semiannual Atomic Energy Commission (AEC) report to Congress. The report sums up the major activities and developments in the national atomic energy program. This ninth report gives a summary of the year's program operations insofar as they can be reported within the limits of national security. It provides as well a brief review of the methods which the Commission follows in contracting with industries, research institutions, and with universities and colleges for the carrying on of the many phases of the national atomic energy program.

  18. 17 CFR 1.12 - Maintenance of minimum financial requirements by futures commission merchants and introducing...

    Science.gov (United States)

    2010-04-01

    ... the Securities and Exchange Commission (17 CFR 240.17a-11(c)), must file written notice to that effect... futures commission merchant or as a leverage transaction merchant must be liquidated immediately... leverage transaction merchant shall be only for the purposes of liquidation, because that clearing member...

  19. The review of constitutional norms concerning local public administration in the view of the European Commission for Democracy through Law (Venice Commission)

    OpenAIRE

    Apostolache, Mihai

    2015-01-01

    The proposals of the Commission to review the Constitution of Romania were subject to the analysis of experts from the European Commission for Democracy through Law (the Venice Commission), who expressed their opinion in a report adopted at the 98th plenary session of the European body. The article analyzes the recommendations of the Venice Commission regarding the proposed changes to the constitutional norms governing local public administration, comprising some general aspects concern...

  20. Members of the Science and Technology Commission, Spanish Senate

    CERN Multimedia

    Maximilien Brice

    2002-01-01

    Photo 01: (left to right) Mr Francisco Xabier Albistur, Senator; Mrs Mercedes Senen, Lawyer of the Commission; Mr Ramon Antonio Socias, Second Vice-President of the Commission; Prof. Luciano Maiani, CERN Director-General, Mr Alonso Arroyo, President of the Commission, signing the VIP visitors' book; and Mr Adolfo Abejon, Senator. Photo 02: Mr Alonso Arroyo, President of the Commission, signing the VIP visitors' book. Photos 03, 04: Mr Ramon Antonio Socias, Second Vice-President of the Commission, signing the VIP visitors' book; and Mr Adolfo Abejon, Senator. Photo 05: Mr Francisco Xabier Albistur, Senator, signing the VIP visitors' book. Photo 06: Mrs Mercedes Senen, Lawyer of the Commission, signing the VIP visitors' book. Photo 07: (left to right) Mr Francisco Xabier Albistur, Senator; Prof. Juan Antonio Rubio, Education and Technology Transfer Division Leader; Prof. Luciano Maiani, CERN Director-General; Mr Ramon Antonio Socias, Second Vice-President of the Commission; Mr Alonso Arroyo, President of the C...

  1. Commissioning for the European XFEL facility

    Science.gov (United States)

    Nölle, D.

    2017-06-01

    The European XFEL is a 4th generation light source based on the Self Amplified Spontaneous Emission (SASE) FreeElectron-Laser concept. It is currently being commissioned in North- Germany. The core installation is a 17.5 GeV superconducting accelerator driving 3 SASE lines with photon energies from 1 to beyond 20 keV range with a maximum of 27.000 pulses per second. The international facility is organized as a limited liability company with shareholders from the contributing countries. DESY has taken over the leadership of the accelerator construction consortium, and will be in charge of the operation of the accelerator complex. The facility was set up with contributions from the 11 shareholder countries, either being hardware systems and/or staff or cash contributions. The construction is almost complete, and the commissioning phase has started by the end of 2015. This contribution will report the status of the accelerator complex with emphasis on the commissioning of the accelerator and an outlook to the commissioning of the SASE 1 FEL line.

  2. COMMISSIONING AND DETECTOR PERFORMANCE GROUPS (DPG)

    CERN Multimedia

    D. Acosta

    Point 5 commissioning activities Since the last CMS week there has been little global commissioning activities: the first mid week global run aiming to assess the status of the hardware and DAQ software after the winter maintenance and developments has taken place two weeks ago involving all subdetectors but tracker and pixel whose hardware is still being actively worked on. The local commissioning restarted once the cooling became available again the third week of January. Below are detailed the main activities which have taken place so far. DAQ The activity of the central DAQ group during pause of global runs was focused on various items. The commissioning of the 900 new PCs which will be used to run the HLT processes has been almost completed. It is planned to use these PCs in the first global run at the start of March. In addition the location of various server PCs which host essential functionalities to get the private ".cms" network going, has been re-organized to allow to implemen...

  3. Powers and Duties of Corporate Affairs Commission

    African Journals Online (AJOL)

    Mofasony

    POWERS AND DUTIES OF THE CORPORATE AFFAIRS. COMMISSION ... The Registrar-General is the Chief Executive of the Commission and is saddled .... Federal Board of Inland Revenue Department of the Ministry of Finance v). Register ...

  4. Research and Development of Protection OPC server for China advanced research reactor digital monitoring system

    International Nuclear Information System (INIS)

    Jia Yuwen; Xu Qiguo

    2012-01-01

    OPC server was developed as I/O driver to communicate the digital monitoring system of China Advanced Research Reactor iFIX and protection system. The framework and working principle of the OPC server were researched, and an effective method was developed to resolve the special communication protocol. After commissioning and testing, the results show that this method is reliable and stable, makes the system easy to configure, and can reduce the complexity of the system. (authors)

  5. Commissioning quality assurance at Pickering NGS

    International Nuclear Information System (INIS)

    Wieckowski, J.T.

    1983-05-01

    Ontario Hydro decided in 1978 to implement a formal quality assurance program applicable to commissioning and operation of nuclear generating stations. Pickering NGS is the first station to have the commissioning quality assurance (CQA) program applied to it. This paper outlines the scope, implementation, and evaluation of the CQA program as applied to Pickering Unit 5

  6. Nuclear Regulatory Commission: more aggressive leadership needed

    International Nuclear Information System (INIS)

    Staats, E.B.

    1980-01-01

    The Energy Reorganization Act of 1974 which established the Nuclear Regulatory Commission required GAO to evaluate the Commission's performance by January 18, 1980. This report responds to that requirement. GAO concluded that, although improvements have been made, the Commission's nuclear regulatory performance can be characterized best as slow, indecisive, cautious - in a word, complacent. This has largely resulted from a lack of aggressive leadership as evidenced by the Commissioners' failure to establish regulatory goals, control policymaking, and most importantly, clearly define their roles in nuclear regulation

  7. Assessment of capabilities and research needs in the area of health effects of low-level ionizing radiation. A joint report to the Congress

    International Nuclear Information System (INIS)

    1979-08-01

    The report summarizes the capabilities, research needs and on-going projects of the Environmental Protection Agency and the Nuclear Regulatory Commission related to the health effects of low-level ionizing radiation. The statutory authorities of both EPA and NRC related to radiation protection and radiation research are also briefly described. An introductory general section describes current efforts to improve Federal radiation research and general methods used by both agencies for radiation dose assessment and the estimation of the potential health effects of low-level ionizing radiation. Separate sections describe the respective authorities, needs, capabilities, and current research programs of the two agencies. The report was prepared to fulfill a requirement by the US Congress which is contained in Section 5(c) of Public Law 95-601

  8. COMMISSIONING AND DETECTOR PERFORMANCE GROUPS

    CERN Multimedia

    D. Acosta

    The global commissioning campaign begins this year with a series of weekly two-day global runs of limited participation until mid-March. The aim of these runs varies week-to-week, but includes the commissioning the calorimeter triggers, the muon track-finder triggers in the DT/CSC overlap, the PLL locking ranges, and generally accumulating data either for HCAL noise characterization or detector studies with cosmic muons. In mid-March a full Global Run is scheduled with all components participating, followed in April by a Cosmic Run with the aim of collecting statistics over a couple weeks with the installed Tracker and other subsystems. The ultimate milestone is the Cosmic Run At Four Tesla (CRAFT), with a completed CMS closed and the solenoid energized for data-taking during June. The Detector Performance Groups start the year with the focus to prepare for LHC collisions, and the associated challenges (CSA08) and global commissioning exercises (CRAFT) along the way. New this year is the addition of the Tri...

  9. COMMISSIONING AND DETECTOR PERFORMANCE GROUPS

    CERN Document Server

    T. Camporesi

    The major progress made during the last months has been in the consolidation of services for the +endcaps and three barrel wheels (YB+2, YB+1 and YB0): all subdetectors have now final power connections (including Detector Safety protection), the gas systems have been commissioned for all gas detectors (the recirculation is not yet activated for the RPC though) and detector cooling has also been commissioned. Their integration with final services is the necessary condition for being able to operate larger fractions the detector. Recent weeks have seen full HCAL, more than 50% of EB and full wheels of DTs and CSC being operated using final services. This has not yet translated into major progress of global integration due to major interruptions of central services, which have not allowed the necessary debugging and commissioning time to all the subdetec¬tors and central activities like DAQ and trigger. Moreover the running in of the final central services has introduced instabilities related to the co...

  10. COMMISSIONING AND DETECTOR PERFORMANCE GROUPS

    CERN Document Server

    T. Camporesi

    P5 Commissioning activities The commissioning effort at the pit has made major progress since the last CMS week concerning the installation and operation of the off-detector electronics in USC. The progress has been much slower in the experi¬mental cavern due to the delay in the deployment of the infrastructure which should eventually allow safe powering-up of the front ends. Nevertheless, temporary power connections have allowed operation of slices of subdetectors at any given time. HF, HE, ECAL, DTs, RPCs and CSCs have carried out local commissioning tests with these temporary services. The status of hardware deployment in USC and on the towers/balconies is represented in the detailed table below.   Table 1: Status of installation of off-detector electronics. FEDs are detector dependent hardware modules which perform the first ‘colla¬tion’ of front-end data and send it to Central-data for event building. Tracker, ECAL, HCAL have their front end electronics mo...

  11. Stepwise commissioning of a steam boiler with stability guarantees

    DEFF Research Database (Denmark)

    Johansen, Simon Vestergaard; Kallesøe, Carsten Skovmose; Bendtsen, Jan Dimon

    2016-01-01

    This paper aims to make the commissioning of an industrial MIMO controller more straightforward by gradually commissioning it from a set of SISO controllers, after the system has been started. For this purpose a stepwise commissioning strategy based on the Youla-Kucera parametrization has been de...... been commissioned from a SISO controller using the developed method on a real steam boiler and measurements show a clear performance improvement after transition....

  12. C46 `ASTRONOMY Education and Development': a Peculiar Commission

    Science.gov (United States)

    de Greve, Jean-Pierre; García, Beatriz; Gerbaldi, Michèle; Ferlet, Roger; Guinan, Edward; Hearnshaw, John; Jones, Barrie; Marschall, Laurence; Miley, George; Pasachoff, Jay; Ros, Rosa; Stavinschi, Magda; Torres-Peimbert, Silvia

    2016-04-01

    C46 was a Commission of the Executive Committee of the IAU under Division XII (Union-Wide Activities), then after 2012 under Division C (Education, Outreach, and Heritage). It was the only commission dealing exclusively with astronomy education; a previous Commission 38 (Exchange of Astronomers), which allocated travel grants to astronomers who needed them, and a Working Group on the Worldwide Development of Astronomy, have been absorbed by Commission 46.

  13. Research laboratories annual report 1994

    International Nuclear Information System (INIS)

    1996-01-01

    The publication is the 1994 annual report of the Israel atomic energy commission in a new format. The report includes three invited papers and a bibliographic list of publications by the commission scientific researches

  14. Research laboratories annual report 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-10-01

    The publication is the 1994 annual report of the Israel atomic energy commission in a new format. The report includes three invited papers and a bibliographic list of publications by the commission scientific researches.

  15. The Philippine Atomic Energy Commission overseas nuclear training program: a follow-up evaluation

    International Nuclear Information System (INIS)

    Relunia, E.D.

    1985-03-01

    This study was made to assess the Philippine Atomic Energy Commission (PAEC) overseas nuclear training programme for the period 1959-1984. Based on the survey and interview, the PAEC overseas nuclear training has a significant impact on the institutional outputs, outside supports, internal operations, and development targets of the recipient-agencies. It was found to be effective in terms of the research studies completed. The agricultural sector was most effective in terms of researches completed. In terms of extent of utilization, data show that the skills and or techniques acquired by scholars during training were not fully utilized. The existing PAEC procedures in selection of nominee is effective. The author recommended that scholars be given greater opportunity to discuss and help plan their training programme, especially with their supervisors amd peers; provisions should be made by the PAEC administrators of training with scholars on transmission of training to others, upon their return; control in the system of guarantee return of scholars; allocation of training slots should be by field and development-oriented as well as the organization where the scholars works must be ready for change. (ELC). 22 tabs.; appendix

  16. Can Free Entry be Inefficient? Fixed Commissions and Social Waste in the Real Estate Industry

    OpenAIRE

    Chang-Tai Hsieh; Enrico Moretti

    2002-01-01

    Real estate agents in the US typically charge a 6 percent commission, regardless of the price of the house sold. As a consequence, the commission fee from selling a house will differ dramatically across cities depending on the average price of housing, although the effort necessary to match buyers and sellers may not be that different. We use a simple economic model and cross-city data to measure the effect of the fixed commission rate on market entry by real-estate agents. We show that if th...

  17. Leadership for health commissioning in the new NHS.

    Science.gov (United States)

    Coleman, Anna; Segar, Julia; Checkland, Kath; McDermott, Imelda; Harrison, Stephen; Peckham, Stephen

    2015-01-01

    The purpose of this paper is to explore the early experiences of those involved with the development of Clinical Commissioning Groups (CCGs), examining how the aspiration towards a "clinically-led" system is being realised. The authors investigate emerging leadership approaches within CCGs in light of the criterion for authorisation that calls for "great leaders". Qualitative research was carried out in eight case studies (CCGs) across England over a nine-month period (September 2011 to May 2012) when CCGs were in their early development. The authors conducted a mix of interviews (with GPs and managers), observations (at CCG meetings) and examined associated documentation. Data were thematically analysed. The authors found evidence of two identified approaches to leadership - positive deviancy and responsible guardianship - being undertaken by GPs and managers in the developing CCGs. Historical experiences and past ways of working appeared to be influencing current developments and a commonly emerging theme was a desire for the CCG to "do things differently" to the previous commissioning bodies. The authors discuss how the current reorganisation threatens the guardianship approach to leadership and question if the new systems being implemented to monitor CCGs' performance may make it difficult for CCGs to retain creativity and innovation, and thus the ability to foster the positive deviant approach to leadership. This is a large scale piece of qualitative research carried out as CCGs were beginning to develop. It provides insight into how leadership is developing in CCGs highlighting the complexity involved in these roles.

  18. Commissioning the Linac Coherent Light Source injector

    Directory of Open Access Journals (Sweden)

    R. Akre

    2008-03-01

    Full Text Available The Linac Coherent Light Source is a SASE x-ray free-electron laser (FEL project presently under construction at SLAC [J. Arthur et al., SLAC-R-593, 2002.]. The injector section, from drive laser and rf photocathode gun through first bunch compressor chicane, was installed in the fall of 2006. The initial system commissioning with an electron beam was completed in August of 2007, with the goal of a 1.2-micron emittance in a 1-nC bunch demonstrated. The second phase of commissioning, including second bunch compressor and full linac, is planned for 2008, with FEL commissioning in 2009. We report experimental results and experience gained in the first phase of commissioning, including the photocathode drive laser, rf gun, photocathode, S-band and X-band rf systems, first bunch compressor, and the various beam diagnostics.

  19. Commissioning quality assurance for nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1986-09-01

    This standard contains the requirements for the quality assurance program applicable to the commissioning phase of a nuclear power plant. This standard embodies the relevant quality assurance requirements of CSA Standard CAN3-N286.0, and is the governing Standard for commissioning quality assurance activities in the event of any conflicting requirements. This Standard applies to the commissioning of safety-related equipment, systems, and structures as identified by the owner. It may be applied to other equipment, systems, and structures at the discretion of the owner. 1 fig.

  20. Commissioning quality assurance for nuclear power plants

    International Nuclear Information System (INIS)

    1986-09-01

    This standard contains the requirements for the quality assurance program applicable to the commissioning phase of a nuclear power plant. This standard embodies the relevant quality assurance requirements of CSA Standard CAN3-N286.0, and is the governing Standard for commissioning quality assurance activities in the event of any conflicting requirements. This Standard applies to the commissioning of safety-related equipment, systems, and structures as identified by the owner. It may be applied to other equipment, systems, and structures at the discretion of the owner. 1 fig

  1. Surrogacy commissioning fathers and HIV

    OpenAIRE

    Jordaan, D W

    2014-01-01

    Surrogacy is not regulated by a single legal instrument only, nor is confirmation of a surrogacy agreement by the High Court an unqualified green light for the surrogacy process to proceed. In the context of the HIV status of the commissioning father, whose gametes are to be used for the conception of the child in pursuance of a surrogacy agreement, the intended in vitro fertilisation of the surrogate mother may only take place on condition that the commissioning father, and his semen, have b...

  2. Ghana Space Science and Technology Institute (GSSTI),Ghana Atomic Energy Commission: Annual Report 2013/2014

    International Nuclear Information System (INIS)

    2014-01-01

    The report presents the structure as well as the research projects of the newly established Ghana Space Science and Technology Institute of the Ghana Atomic Energy Commission from January to December 2014. Research projects listed are in the areas of Astronomy and Astrophysics; Remote Sensing; Electronics and Instrumentation; and Satellite Communication.

  3. The Australian Royal Commission into Institutional Responses to Child Sexual Abuse.

    Science.gov (United States)

    Wright, Katie; Swain, Shurlee; McPhillips, Kathleen

    2017-12-01

    The Royal Commission into Institutional Responses to Child Sexual Abuse is the largest royal commission in Australia's history and one of the largest public inquiries into institutional child abuse internationally. With an investment from the Australian government of half a billion dollars, it examined how institutions with a responsibility for children, both historically and in the present, have responded to allegations of child sexual abuse. Announced in the wake of previous Australian and international inquiries, public scandals and lobbying by survivor groups, its establishment reflected increasing recognition of the often lifelong and intergenerational damage caused by childhood sexual abuse and a strong political commitment to improving child safety and wellbeing in Australia. This article outlines the background, key features and innovations of this landmark public inquiry, focusing in particular on its extensive research program. It considers its international significance and also serves as an introduction to this special edition on the Australian Royal Commission, exploring its implications for better understanding institutional child sexual abuse and its impacts, and for making institutions safer places for children in the future. Copyright © 2017 The Authors. Published by Elsevier Ltd.. All rights reserved.

  4. Summarisation of construction and commissioning experience for nuclear power integrated test facility

    International Nuclear Information System (INIS)

    Xiao Zejun; Jia Dounan; Jiang Xulun; Chen Bingde

    2003-01-01

    Since the foundation of Nuclear Power Institute of China, it has successively designed various engineering experimental facilities, and constructed nuclear power experimental research base, and accumulated rich construction experiences of nuclear power integrated test facility. The author presents experience on design, construction and commissioning of nuclear power integrated test facility

  5. 75 FR 73083 - Sunshine Act Meeting; Open Commission Meeting

    Science.gov (United States)

    2010-11-29

    ... FEDERAL COMMUNICATIONS COMMISSION Sunshine Act Meeting; Open Commission Meeting November 30, 2010. The Federal Communications Commission will hold an Open Meeting on the subjects listed below on... demonstrate accessibility technologies. The meeting site is fully accessible to people using wheelchairs or...

  6. 75 FR 2114 - Military Leadership Diversity Commission (MLDC); Meeting

    Science.gov (United States)

    2010-01-14

    ... DEPARTMENT OF DEFENSE Office of the Secretary Military Leadership Diversity Commission (MLDC....150, the Department of Defense announces that the Military Leadership Diversity Commission (MLDC) will... commissioners of the Military Leadership Diversity Commission to continue their efforts to address congressional...

  7. Overall review strategy for the Nuclear Regulatory Commission's High-Level Waste Repository Program

    International Nuclear Information System (INIS)

    Johnson, R.L.

    1994-11-01

    The Overall Review Strategy gives general guidance to the Nuclear Regulatory Commission staff for conducting it's license application and pre-license application reviews. These reviews are in support of the Commission's construction authorization decision for a geologic repository for the disposal of high-level radioactive waste. Objectives and strategies are defined that focus the staff's reviews on determining compliance with requirements of 10 CFR Part 60. These strategies define how the staff prioritizes its reviews on those key technical uncertainties considered to be most important to repository performance. Strategies also give guidance for developing, in an integrated way, the License Application Review Plan together with supporting performance assessments, analyses, and research

  8. Regulatory Commission of Alaska

    Science.gov (United States)

    Map Help Regulatory Commission of Alaska Login Forgot Password Arrow Image Forgot password? View Cart login Procedures for Requesting Login For Consumers General Information Telephone Electric Natural Gas

  9. 36 CFR 401.6 - Approval by National Commission of Fine Arts.

    Science.gov (United States)

    2010-07-01

    ... Commission of Fine Arts. 401.6 Section 401.6 Parks, Forests, and Public Property AMERICAN BATTLE MONUMENTS COMMISSION MONUMENTS AND MEMORIALS § 401.6 Approval by National Commission of Fine Arts. A design for a... Commission of Fine Arts before the Commission can accept it. ...

  10. 18 CFR 375.102 - Custody and authentication of Commission records.

    Science.gov (United States)

    2010-04-01

    ... authentication of Commission records. 375.102 Section 375.102 Conservation of Power and Water Resources FEDERAL... Provisions § 375.102 Custody and authentication of Commission records. (a) Custody of official records. (1...) Authentication of Commission action. All orders and other actions of the Commission shall be authenticated or...

  11. Neutron production and dose rate in the IFMIF/EVEDA LIPAc injector beam commissioning

    Energy Technology Data Exchange (ETDEWEB)

    Kondo, Keitaro, E-mail: kondo.keitaro@jaea.go.jp [Rokkasho Fusion Institute, Japan Atomic Energy Agency, Rokkasho-mura, Kamikita-gun, Aomori (Japan); Narita, Takahiro; Usami, Hiroki; Takahashi, Hiroki; Ochiai, Kentaro; Shinto, Katsuhiro; Kasugai, Atsushi [Rokkasho Fusion Institute, Japan Atomic Energy Agency, Rokkasho-mura, Kamikita-gun, Aomori (Japan); Okumura, Yoshikazu [IFMIF/EVEDA Project Team, Rokkasho-mura, Kamikita-gun, Aomori (Japan)

    2016-11-01

    Highlights: • A dedicated neutron production yield monitoring system for LIPAc has been developed. • The biological dose rate during operation of the LIPAc injector was analyzed. • The neutron streaming effect due to penetrations in the shielding wall was investigated. - Abstract: The construction of the Linear IFMIF Prototype Accelerator (LIPAc) is in progress in Rokkasho, Japan, and the deuteron beam commissioning of the injector began in July 2015. Due to the huge beam current of 125 mA, a large amount of d-D neutrons are produced in the commissioning. The neutron streaming effect through pipe penetrations and underground pits may dominate the radiation dose at the outside of the accelerator vault during the injector operation. In the present study the effective dose rate expected during the injector commissioning was analyzed by a Monte Carlo calculation and compared with the measured value. For the comparison it is necessary to know the total neutron production yield in the accelerator vault, thus a dedicated neutron production yield monitoring system was developed. The yield obtained was smaller than that previously reported in a literature by a factor of a few and seems to depend on some beam conditions. From the comparison it was proved that the calculation always provides a conservative estimate and the dose rates in places where occupational works can always access and the controlled area boundary are expected to be far less than the legal criteria throughout the injector commissioning.

  12. Methods and quality assurance in environmental medicine. Formation of a RKI-Commission

    International Nuclear Information System (INIS)

    Eis, D.

    2000-01-01

    An almost bewildering number of widely differing methods and techniques, often not validated, are being applied often inappropriately in the field of environmental medicine to answer questions regarding exposure assessment, diagnosis, treatment, counselling and prevention. Therefore, quality control within the field of environmental medicine is quite problematic. A primary goal of the newly formed RKI-Commission 'Methods and Quality Assurance in Environmental Medicine' is to form a panel of experts in the field, who evaluate the situation and generate consensus documents containing respective recommendations. By this the commission will contribute to standardization and agreement on appropriate methods, procedures and their correct application in the practice of environmental medicine. Hopefully it will also achieve a stronger, more consistent use of evidence-based-medicine and improve the quality of the structure, processes and results of research and practice in this field. The committee will initially deal with the issue of clinical environmental medicine, because here the largest problems in quality assurance are seen. In this context the commission will look at the problem areas of environmental-medical outpatient units and environmental clinics. The work of the commission will be supported by the newly formed Documentation and Evaluation Center for Methods in Environmental Medicine (Zentrale Erfassungs- und Bewertungsstelle fuer umweltmedizinische Methoden, ZEBUM) at the Robert Koch Institute. (orig.) [de

  13. Commissioning for Humidified Buildings

    National Research Council Canada - National Science Library

    Deal, Brian

    1998-01-01

    .... Although proper commissioning procedures have been noted to reduce the potential for approximately 70 percent of these claims, no standards exist for the control of moisture migration in building...

  14. EU Commission participation in the Troika mission: is there a European Union price to pay?

    Directory of Open Access Journals (Sweden)

    Antonio Goucha Soares

    2015-06-01

    Full Text Available The article is intended to debate two questions regarding the involvement of the Commission in the Troika's action: firstly, considering the nature of financial assistance programs, it aims to discuss the effect of the Commission's participation in Troika negotiations on the balance of power of the EU institutions; and secondly, the article raises the issue of the Commission's liability for the results achieved by the financial assistance program, taking into account the extent of the conditions imposed, as well as the intensity of scrutiny by the Troika.

  15. Commissioning of the ATLAS Experiment

    CERN Document Server

    AUTHOR|(CDS)2069446

    2008-01-01

    The status of the commissioning of the ATLAS experiment as of May 2008 is presented. The subdetector integration in recent milestone weeks is described, especially the cosmic commissioning in milestone week M6, focusing on simultaneous running and combined track analysis of the muon detector and inner detector. The liquid argon and tile calorimeters have achieved near-full operation, and are integrated with the calorimeter trigger. The High-Level-Trigger infrastructure is installed and algorithms tested in technical runs. Problems with the inner detector cooling compressors are being fixed.

  16. The International Whaling Commission – Beyond Whaling

    Directory of Open Access Journals (Sweden)

    Andrew John Wright

    2016-08-01

    Full Text Available Since its establishment in 1946 as the international body intended to manage whaling, the International Whaling Commission (IWC has expanded its areas of interest to ensure the wider conservation of whales. Several key conservation topics have been taken forward under its auspices including climate change, chemical and noise pollution, marine debris and whale watching. Work on each of these topics at the IWC has grown substantially since the 1990s and remains ongoing. Important developments were the establishment of the Standing Working Group on Environmental Concerns in 1996 and the IWC’s Conservation Committee in 2003. Trying to address this diverse set of issues is obviously a challenge but will be necessary if the long term conservation of cetaceans is to be achieved. Through research, workshops, resolutions and collaboration with other organisations, the IWC has advanced both the understanding of the various issues and the means to manage them with increasing effectiveness. The IWC is likely to remain on the forefront of continuing efforts to address these, and other, conservation concerns and ensure the continued viability of cetacean populations around the globe.

  17. Commissioning and Operational Experience in Power Reactor Fuel Reprocessing Plant

    Energy Technology Data Exchange (ETDEWEB)

    Pradhan, S., E-mail: spradhan@barctara.gov.in [Tarapur Based Reprocessing Plant, Bhabha Atomic Research Centre, Tarapur (India)

    2014-10-15

    After completing design, construction, commissioning, operation and maintenance experience of the reprocessing plants at Tarapur, Mumbai and Kalpakkam a new reprocessing plant is commissioned and put into operation at BARC, Tarapur since 2011. Subsequent to construction clearance, commissioning of the plant is taken in many steps with simultaneous review by design and safety committees. In spite of vast experience, all the staff was retrained in various aspects of process and utility operations and in operation of innovative changes incorporated in the design. Operating personnel are licensed through an elaborate procedure consisting of various check lists followed by personnel interview. Commissioning systems were divided in sub-systems. Sub-systems were commissioned independently and later integrated testing was carried out. For commissioning, extreme operating conditions were identified in consultation with designers and detailed commissioning procedures were made accordingly. Commissioning was done in different conditions to ensure safety, smooth operation and maintainability. Few modifications were carried out based on commissioning experience. Technical specifications for operation of the plant are made in consultation with designers and reviewed by safety committees. Operation of the plant was carried out after successful commissioning trials with Deep Depleted Uranium (DDU). Emergency operating procedures for each design basis accident were made. Performance of various systems, subsystems are quite satisfactory and the plant has given very good capacity factor. (author)

  18. Development of the practical application of the recommendations of the international commission on radiological protection

    International Nuclear Information System (INIS)

    Dunster, H.J.

    1998-01-01

    The International Commission on Radiological Protection grew out of the International X-ray and Radium Protection Commission set up in 1928. Its Recommendations have developed from simple prescriptive rules for protecting the medical staff using x rays and radium to a complete System of Protection for all human activities that involve exposure to ionizing radiation. The Commission is satisfied that some of the health effects of radiation are caused, albeit with small probabilities, by small doses. Its System of Protection is therefore risk-based. It is no longer prescriptive and has to be applied with judgement. The basis of that judgement and the framework for its application are set out in ICRP Publication 60, the 1990 Recommendations of the Commission

  19. Commissioning of specialist palliative care services in England.

    Science.gov (United States)

    Lancaster, Harriet; Finlay, Ilora; Downman, Maxwell; Dumas, James

    2018-03-01

    Some failures in end-of-life care have been attributed to inconsistent provision of palliative care across England. We aimed to explore the variation in commissioning of services by Clinical Commissioning Groups (CCGs) using a data collection exercise. We sent a Freedom of Information request in the form of an open questionnaire to all 209 CCGs in England to assess their commissioning of palliative and end-of-life care services, mainly focused on the provision of specialist palliative care services. 29 CCGs provided information about the number of patients with some form of palliative care needs in their population. For specialist palliative care services, CCGs allocated budgets ranging from £51.83 to £2329.19 per patient per annum. 163 CCGs (77.90%) currently commission 7-day admission to their specialist palliative care beds. 82.84% of CCGs commission 7-day specialist palliative care services in patients' own homes and out-of-hours services rely heavily on hospice provision. 64 CCGs (31.37%) commission pain control teams, the majority of whom only operate in regular working hours. 68.14% of CCGs reported commissioning palliative care education of any sort for healthcare professionals and 44.85% of CCGs had no plans to update or review their palliative care services. The most important finding from this exercise is that the information CCGs hold about their population and services is not standardised. However, information based on data that are more objective, for example, population and total budget for palliative care, demonstrate wide variations in commissioning. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/.

  20. NRC safety research in support of regulation, FY 1992

    International Nuclear Information System (INIS)

    1993-05-01

    This report, the eighth in a series of annual reports, was prepared in response to congressional inquiries concerning how nuclear regulatory research is used. It summarizes the accomplishments of the Office of Nuclear Regulatory Research during FY 1992. A special emphasis on accomplishments in nuclear power plant aging research reflects recognition that a number of plants are entering the final portion of their original 40-year operating licenses and that, in addition to current aging effects, a focus on safety considerations for license renewal becomes timely. The primary purpose of performing regulatory research is to develop and provide the Commission and its staff with the technical bases for regulatory decisions on the safe operation of licensed nuclear reactors and facilities, to find unknown or unexpected safety problems, and to develop data and related information for the purpose of revising the Commission's rules, regulatory guides, or other guidance

  1. Restructuring the Energy System. Report of the Energy Commission

    International Nuclear Information System (INIS)

    1995-01-01

    The commission was instructed to examine the current energy policy programs for restructuring and developing the energy system (i.e. phasing out nuclear power and moving to renewable sources) and to analyze the needs for changes; to propose measures for ensuring an efficient electricity supply under the new conditions of a liberalized electricity market; and to present proposals for a schedule for reorganizing the energy system. The report gives a full picture of the Swedish energy system including supply, consumption, prices, environmental impacts, R and D, and international aspects. The commission concludes that one nuclear power plant can be closed during the 1990's without upsetting the power balances. Phasing out all nuclear plants by year 2010 will create problems with the price levels of electricity supply, and will conflict with the CO 2 reduction objective. The proposals for economic control measures for performing the restructuring include: An environmental bonus (or investment support) for environmentally sound electricity production financed by an electricity tax, a tax on nuclear power increasing with the age of the reactors, a reorganization fund to finance new and environmentally acceptable electricity production. Also, energy research should be allotted greater resources, in particular for new technology for electricity production. The commission points towards the possibilities for reducing energy consumption, and especially electricity consumption. Space heating should gradually move away from electric heating. Examples are given on measures for improving energy efficiency and problems with financing such measures should be studied

  2. Commissioning of the LHC

    CERN Multimedia

    CERN. Geneva

    2007-01-01

    The LHC construction is now approaching the end and it is now time to prepare for commissioning with beam. The behavior of a proton storage ring is much different to that of LEP, which profited from strong radiation damping to keep the beam stable. Our last experience with a hadron collider at CERN goes back more than 15 years when the proton-antiproton collider last operated. Ppbar taught us a lot about the machine physics of bunched beam proton storage rings and was essential input for the design of the LHC. After a short presentation of where we stand today with machine installation and hardware commissioning, I will discuss the main machine physics issues that will have to be dealt with in the LHC.

  3. Report of the State of Nevada Commission on Nuclear Projects

    International Nuclear Information System (INIS)

    1990-12-01

    This third biennial Report of the Nevada Commission on Nuclear Projects has been prepared in fulfillment of the requirements of NRS 459.0092, which stipulates that the Commission shall report to the Governor and Legislature on any matter relating to radioactive waste disposal the Commission deems appropriate and advise and make recommendations on the policy of the State concerning nuclear waste disposal projects. Chapter One of the Report presents a brief overview of the Commission's functions and statutory charges. It also contains a summary of developments which have affected the overall nuclear waste disposl issue since the last Commission Report was published in November, 1988. Chapter Two contains a synthesis of Commission activities and reports on the findings of the Commission relative to the geotechnical, environmental, socioeconomic, transportation, intergovernmental and legal aspects of federal and State nuclear waste program efforts

  4. Danger! Automation at Work; Report of the State of Illinois Commission on Automation and Technological Progress.

    Science.gov (United States)

    Karp, William

    The 74th Illinois General Assembly created the Illinois Commission on Automation and Technological Progress to study and analyze the economic and social effects of automation and other technological changes on industry, commerce, agriculture, education, manpower, and society in Illinois. Commission members visited industrial plants and business…

  5. Commissioning and start-up of RA-8 critical assembly

    International Nuclear Information System (INIS)

    Lorenzo, N. de; Diaz, C.; Facchini, G.; Fernandez, C.; Fittipaldi, A.; Juracich, R.; Levanon, I.; Manceda, J.; Martinez, J.; Mogdan, R.; Perez, J.; Scarnichia, E.; Blaumann, H.; Gennuso, G.; Scotti, G.

    1999-01-01

    The RA-8 critical assembly was designed as one of the experimental facilities for the CAREM Reactor Project. This paper describes the activities developed during the cold and hot commissioning, pointing out the difficulties and the solutions applied (some of them original ones). Moreover, this paper will show the main features of the newest nuclear installation of CNEA making a brief description of its characteristics. Among the special circumstances related to the commissioning that are described in the paper we can mention the following: 1. The facility shares the building with the Thermohydraulic Assay Laboratory (L.E.T.), another experimental facility of CAREM, and thus some shared systems have already been working for many years before this start up. Special procedures for these systems were designed to verify the proper functioning under the new requirements. 2. A new driving mechanism, based in hydraulic cylinders, was used to move the control rods. The criteria for acceptance and a validation of the procedure completeness have been carried out. 3. The implementation of a power measurement system based in neutron noise. 4. Measurement of Power Distribution using direct gamma counting from the fuel elements. 5. The commissioning was interrupted for a ten-month period because the personnel involved had to carry out the commissioning of the Egyptian Research Reactor 2. Also, the common activities during a commissioning are described, pointing out the major steps carried out and the results obtained. The following are examples of these activities: 1. Environmental dose survey (before fuel loading and during other stages). 2. Test of equipment and systems isolated from the rest of the plant. 3. Integrated system test (two or more systems working at the same time). 4. Start-up and power operation simulations before fuel loading. 5. Fuel loading strategy during the approximation to criticality by mass. 6. Modification of systems' components to improve the

  6. 75 FR 37789 - Orlando Utilities Commission; Notice of Filing

    Science.gov (United States)

    2010-06-30

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. NJ10-2-000] Orlando Utilities Commission; Notice of Filing June 23, 2010. Take notice that on June 11, 2010, the Orlando Utilities Commission filed, pro forma revised tariff sheets for inclusion in its open access transmission...

  7. Commissioning of the LNLS 2 T Hybrid Wiggler

    CERN Document Server

    Farias, Ruy H A; Aparecida-Gouveia, Ana F; Cabral-Jahnel, Lucia; Citadini, James F; Ferreira, Marcelo J; Franco, J G; Liu, Lin; Neuenschwander, Regis; Resende, Ximenes R; Tavares, Pedro; Tosin, Giancarlo

    2005-01-01

    We present the results of the commissioning of a 28-pole 2 T Hybrid Wiggler at the 1.37 GeV electron storage ring of the Brazilian Synchrotron Light Source. The wiggler will be used mainly for protein crystallography and was optimized for the production of 12 keV photons. The very high field and relatively large gap (22 mm) of this insertion device led to a magnetic design that includes large main and side magnets and heavily saturated poles. We present the results of the commissioning with beam, with special attention to the correction of the large linear tune-shift perturbations produced by the wiggler as well as on the reduction of beam lifetime at full energy. Since the injection at the LNLS storage ring is performed at 500 MeV we also focus on the effects of non-linearities and their impact on injection efficiency.

  8. 76 FR 31307 - Commission of Fine Arts; Notice of Meeting

    Science.gov (United States)

    2011-05-31

    ... COMMISSION OF FINE ARTS Commission of Fine Arts; Notice of Meeting The next meeting of the U.S. Commission of Fine Arts is scheduled for June 16, 2011, at 10 a.m. in the Commission offices at the National Building Museum,Suite 312, Judiciary Square, 401 F Street, NW., Washington, DC, 20001-2728. Items of...

  9. Requirements for BNCT at a nuclear research reactor. Results from a BNCT workshop organized by the European Commission in Prague, November 2005

    International Nuclear Information System (INIS)

    Moss, Ray; Sauerwein, Wolfgang; Wittig, Andrea; Burian, Jiri

    2006-01-01

    As part of the European Commission's Enlargement and Integration Action (E and IA), which is intended to improve exchange and relationship within the extended European Union (EU), a Workshop was organized in Prague in November 2005. The purpose of the workshop was to present and discuss technical and organisational requirements in setting up a BNCT facility at a research reactor. Topics included: treatment of a patient by BNCT; organisational aspects and regulatory affairs; BNCT from the nuclear perspective and BNCT from the clinician's perspective. Presentations were given by BNCT experts in their particular field, whilst eleven different national nuclear research centres from the New Member States and Accession Countries, interested in developing a BNCT programme, presented the status of their preparations. The conclusions of the Workshop were that an early and close collaboration between nuclear and medical groups is the basis for BNCT, that a local effort to build a BNCT facility should be supported by a national research programme including basic and clinical science and that the JRC and its partners are ready to support national initiatives within the EU and candidate countries. (author)

  10. United States Nuclear Regulatory Commission Staff practice and procedure digest: Commission, Appeal Board and Licensing Board Decisions, July 1972--December 1988

    International Nuclear Information System (INIS)

    1989-10-01

    This Revision 2 of the fifth edition of the NRC Staff Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period from July 1, 1972 to December 31, 1988, interpreting the NRC's Rules of Practice in 10 CFR Part 2. This Revision 2 replaces in part earlier editions and revisions and includes appropriate changes reflecting the amendments to the Rules of Practice Effective through December 31, 1988. The Practice and Procedure Digest was originally prepared by attorneys in the NRC's Office of the Executive Legal Director (now, Office of the General Counsel) as an internal research tool. Because of its proven usefulness to those attorneys, it was decided that it might also prove useful to members of the public. Accordingly, the decision was made to publish the Digest and subsequent editions thereof. This edition of the Digest was prepared by attorneys from Aspen Systems Corporation pursuant to Contract number 18-89-346

  11. Safety improvement and results of commissioning of Mochovce NPP WWER 440/213

    International Nuclear Information System (INIS)

    Lipar, M.

    1998-01-01

    Mochovce NPP is the last one of this kind and compared to its predecessors, it is characterized by several modifications which contribute to the improvement of the safety level. In addition based on Nuclear Regulatory Authority requirements and based on documents: - IAEA - Safety Issues and their ranking for NPP WWER 440/213, - IAEA - Safety Improvement of Mochovce NPP Project Review Mission, - Riskaudit - Evaluation of the Mochovce NPP Safety Improvements. Additional safety measures have been implemented before commissioning. The consortium EUCOM (FRAMATOME - SIEMENS), SKODA Praha, ENERGOPROJEKT Praha, Russian organizations and VUJE Trnava Nuclear Power Plants research institute were selected for design and implementation of the safety measures. The papers summarized, safety requirements, safety measures implemented, results of commissioning and results of safety analysis report evaluation. (author)

  12. NSLS-II commissioning and operation

    Energy Technology Data Exchange (ETDEWEB)

    Wang, G., E-mail: gwang@bnl.gov; Shaftan, T.; Bassi, G.; Bengtsson, J.; Blednykh, A.; Blum, E.; Cheng, W.; Choi, J.; Davidsaver, M.; Doom, L.; Fliller, R.; Ganetis, G.; Guo, W.; Hidaka, Y.; Kramer, S.; Li, Y.; Podobedov, B.; Qian, K.; Rose, J.; Seletskiy, S. [Brookhaven National Laboratory, Upton, NY 11973 (United States); and others

    2016-07-27

    The National Synchrotron Light Source II at Brookhaven National Lab is a third-generation synchrotron radiation facility that has been commissioned in 2014. The facility is based on a 3 GeV electron storage ring, which will circulate 500 mA of beam current at 1 nm rad horizontal emittance. The storage ring is 792 meters in circumference and will accommodate more than 60 beamlines in the final built-out. The beamline sources range from insertion-devices located in straight sections, bending magnets or three-pole-wigglers configured in multiple branches. The NSLS-II storage ring commissioning was successfully completed in July 2014 and the facility delivered the first user light on October 23, 2014. Currently the storage ring reached 300 mA beam current and achieved 1 nm rad of horizontal emittance with 3 sets of Damping Wigglers. At this point six NSLS-II project beamlines are routinely taking photons with beam current at 150 mA. This paper reviews the NSLS-II accelerator design and commissioning experience.

  13. Agency transformation and state public utility commissions

    International Nuclear Information System (INIS)

    Jones, Douglas N.

    2006-01-01

    The demise of public utility commissions has been periodically predicted (sometimes hoped for). In their long history they have been attacked by critics as ineffective, inefficient, expensive, or unnecessary. Further, the demonstrated survivability of the commission concept has often been uncharitably attributed to powerful political constituencies, self-preservation manoeuvrings by commissioners themselves, and inertia. The implications of this article point another way. Commission regulation of public utilities has survived mainly because of continued need for social oversight of these critical industry sectors and the capacity of PUCs strategically to adapt to fundamental changes in their surroundings. Two transformational upheavals are treated here - a challenge of flexibility and responsiveness by the dramatic run-up in costs and prices in the 1970s and challenge to relevance by the policy shift to greater reliance on market competition in the 1990s - and regulation's successful accommodation to them. Viewed this way commission regulation is more in a position of 'second wind' than 'last breath'. (author)

  14. 76 FR 49469 - Orlando Utilities Commission; Notice of Filing

    Science.gov (United States)

    2011-08-10

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. NJ11-15-000] Orlando Utilities Commission; Notice of Filing Take notice that on July 29, 2011, Orlando Utilities Commission (OUC), pursuant to section 205 of the Federal Power Act (FPA) \\1\\ and Part 35 of the Federal Energy Regulatory...

  15. The design, construction, and commissioning of a multi-use cyclotron facility

    International Nuclear Information System (INIS)

    Ho, S.; Hutcheson, M.; Schick-Martin, D.; Dalzell, M.; Alexander, N.

    2015-01-01

    The Sylvia Fedoruk Canadian Centre for Nuclear Innovation in Saskatchewan is in the process of commissioning the Saskatchewan Centre for Cyclotron Sciences that is to be used for both academic research and commercial radiopharmaceutical production. The hybrid nature of this facility comes with unique challenges in satisfying both the rigid demands of pharmaceutical production while providing the necessary flexibility for academic research. In order to meet these competing demands, the Fedoruk Centre has assembled a distinct combination of skill sets and areas of expertise to operate a facility with an interdisciplinary focus. (author)

  16. The LHC from commissioning to operation

    CERN Document Server

    Lamont, M

    2011-01-01

    In 2011 the LHC moved from commissioning into the physics production phase with the aim of accumulating 1 fb-1 by the end of the year. The progress from commissioning to operation is described. Emphasis is put on the beam performance, but also on the performance of the different hardware systems. The role of collimation and machine protection is discussed, in view of the very high stored beam and magnet energy.

  17. Report by USSR survey mission of Nuclear Safety Commission

    International Nuclear Information System (INIS)

    1990-01-01

    The USSR survey mission of Nuclear Safety Commission drew up and presents the report as follows. In relation to the accident in Chernobyl Nuclear Power Station in USSR, in order to investigate into the present status of the countermeasures for nuclear power safety in USSR and to exchange opinion, the USSR survey mission inspected nuclear power station facilities and visited the government organs, research institutes and others in USSR. The survey mission comprised 13 members, and went to Moscow, Kiev and two nuclear power station sites, from October 22 to November 1, 1989, for 11 days. At present in USSR, 49 nuclear power plants of about 35 GWe are in operation, and by 2000, the operation of more nuclear power plants of about 30 GWe is needed, but due to the change of social situation in USSR, its attainment seems to be difficult. The plan of nuclear power generation in USSR, the ensuring of safety in general, the recent countermeasures for improving safety, the effect of the accident in Chenobyl Nuclear Power Station on health and so on are reported. The detailed record of the visit to Zaporozhe and Chernobyl Nuclear Power Stations and 7 other research institutes and government organs is given. (K.I.)

  18. VINCI: the VLT Interferometer commissioning instrument

    Science.gov (United States)

    Kervella, Pierre; Coudé du Foresto, Vincent; Glindemann, Andreas; Hofmann, Reiner

    2000-07-01

    The Very Large Telescope Interferometer (VLTI) is a complex system, made of a large number of separated elements. To prepare an early successful operation, it will require a period of extensive testing and verification to ensure that the many devices involved work properly together, and can produce meaningful data. This paper describes the concept chosen for the VLTI commissioning instrument, LEONARDO da VINCI, and details its functionalities. It is a fiber based two-way beam combiner, associated with an artificial star and an alignment verification unit. The technical commissioning of the VLTI is foreseen as a stepwise process: fringes will first be obtained with the commissioning instrument in an autonomous mode (no other parts of the VLTI involved); then the VLTI telescopes and optical trains will be tested in autocollimation; finally fringes will be observed on the sky.

  19. Supplementary plasma heating studies in the Atomic Energy Commission France

    International Nuclear Information System (INIS)

    Consoli, T.

    1976-01-01

    The research on supplementary heating of toroidal plasma made in France at the Atomic Energy Commission and in the European Community are described (with special reference to the J.E.T. project) in the frame of the national programs. A non exhaustive description of the world effort in this topic is also presented: (neutral injection heating, TTMP (transit time magnetic pumping) heating, electron and ion cyclotron resonance, and lower hybrid resonance heating)

  20. Cognitive Enhancement and Beyond: Recommendations from the Bioethics Commission.

    Science.gov (United States)

    Allen, Anita L; Strand, Nicolle K

    2015-10-01

    Media outlets are reporting that cognitive enhancement is reaching epidemic levels, but evidence is lacking and ethical questions remain. The US Presidential Commission for the Study of Bioethical Issues (Bioethics Commission) has examined the issue, and we lay out the commission's findings and their relevance for the scientific community. Published by Elsevier Ltd.

  1. The Kemeny commission report. Comments by UKAEA

    International Nuclear Information System (INIS)

    1979-01-01

    The report of the President's Commission - the Kemeny Report - on the accident at Three Mile island has been considered by the UKAEA and the implications of the Commission's findings and recommendations for the United Kingdom examined. The contents of the report have been studied not only generally but also for each site and especially with respect to plant instrumentation, operator training, emergency arrangements and communications. The Authority believes that there are no major deficiencies but is fully aware of the crucial importance of continuing to exercise all possible care and ensuring that each detailed point arising from the Kemeny Commission's Report is given careful thought. (U.K.)

  2. SU-F-T-160: Commissioning of a Single-Room Double-Scattering Proton Therapy System

    Energy Technology Data Exchange (ETDEWEB)

    Jin, H; Ahmad, S; Chen, Y; Lau, A; Islam, M; Ferreira, C; Ferguson, S [University of Oklahoma Health Sciences Center, Oklahoma City, OK (United States); Keeling, V [Carti, Inc., Little Rock, AR (United States)

    2016-06-15

    Purpose: To report the detailed commissioning experience for a compact double-scattering Mevion S250 proton therapy system at a University Cancer Center site. Methods: The commissioning of the proton therapy system mainly consisted of ensuring integrity of mechanical and imaging system, beam data collection, and commissioning of a treatment planning system (TPS). First, mechanical alignment and imaging were tested including safety, interlocks, positional accuracy of couch and gantry, image quality, mechanical and imaging isocenter and so on. Second, extensive beam data (outputs, PDDs, and profiles) were collected and analyzed through effective sampling of range (R) and modulation width (M) from 24 beam options. Three different output (cGy/MU) prediction models were also commissioned as primary and secondary MU calculation tool. Third, the Varian Eclipse TPS was commissioned through five sets of data collections (in-water Bragg peak scans, in-air longitudinal fluence scans, in-air lateral profiles, in-air half-beam profiles, and an HU-to-stopping-power conversion curve) and accuracy of TPS calculation was tested using in-water scans and dose measurements with a 2D array detector with block and range compensator. Finally, an anthropomorphic phantom was scanned and heterogeneity effects were tested by inserting radiochromic films in the phantom and PET activation scans for range verification in conjunction with end-to-end test. Results: Beam characteristics agreed well with the vendor specifications; however, minor mismatches in R and M were found in some measurements during the beam data collection. These were reflected into the TPS commissioning such that the TPS could accurately predict the R and M within tolerance levels. The output models had a good agreement with measured outputs (<3% error). The end-to-end test using the film and PET showed reasonably the TPS predicted dose, R and M in heterogeneous medium. Conclusion: The proton therapy system was successfully

  3. Overview of the Nuclear Regulatory Commission's safety research program

    International Nuclear Information System (INIS)

    Beckjord, E.S.

    1989-01-01

    Accomplishments during 1988 of the Office of Nuclear Regulatory Research and the program of safety research are highlighted, and plans, expections, and needs of the next year and beyond are discussed. Topics discussed include: ECCS Appendix K Revision; pressurized thermal shock; NUREG-1150, or the PRA method performance document; resolution of station blackout; severe accident integration plan; nuclear safety research review committee; and program management

  4. 75 FR 5485 - Blue Ribbon Commission on America's Nuclear Future

    Science.gov (United States)

    2010-02-03

    ... and other aspects of the back end of the nuclear fuel cycle. Yet the Nation's approach, developed more... in our country and abroad have learned a great deal about effective strategies for managing nuclear... perspectives, and may include participation of appropriate Federal officials. The Commission's business should...

  5. The Lancet Commission on Syria | IDRC - International ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    The journal has adopted a series of global commissions that convene groups of experts for a limited time to produce thematic work aimed at improving human lives through scientific review and inquiry, and to encourage accountability for the problem under study. The Commission on Syria marks the first time a Southern ...

  6. Management program on radioactive wastes in research

    International Nuclear Information System (INIS)

    Xavier, Ana Maria; Wieland, Patricia; Heilbron Filho, Paulo Fernando L.; Ferreira, Rubemar de Souza

    1998-01-01

    This document has the objective to orient and advise the researchers to practice a safety management of radioactive wastes in each research laboratory, based upon the technical norms of the Brazilian Nuclear Energy Commission and the recommendations of the International Atomic Energy Agency. Additionally, basic information on the main radioisotopes used in research are presented, including the processes used for production of radioisotopes, methods for radiation detection, range of alpha and beta particles, background radiation, as well as principles on radioprotection and biological effects of radiation

  7. 77 FR 67637 - Equity and Excellence Commission

    Science.gov (United States)

    2012-11-13

    ... notice also describes the functions of the Commission. Notice of this meeting is required by section 10(a.... ADDRESSES: The Commission will meet in Washington, DC at the National Museum of the American Indian at... Lounge of the museum on November 27 and in the museum's fourth-floor conference room on November 28. FOR...

  8. Nuclear Regulatory Commission issuances

    Energy Technology Data Exchange (ETDEWEB)

    1994-03-01

    This report includes the issuances received during the specified period from Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM).

  9. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1994-03-01

    This report includes the issuances received during the specified period from Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  10. 17 CFR 146.9 - Appeals to the Commission.

    Science.gov (United States)

    2010-04-01

    ... Commission or any Commission employee has failed or refused to comply with provisions of the Privacy Act or... disagreement has been filed shall clearly note the portion which is disputed, and include a copy of the...

  11. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1993-08-01

    This report includes the issuances received during the specified period from the commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors; Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  12. Nuclear Regulatory Commission Issuances

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM).

  13. Nuclear Regulatory Commission Issuances

    International Nuclear Information System (INIS)

    1996-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM)

  14. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1991-10-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  15. Nuclear Regulatory Commission Issuance

    International Nuclear Information System (INIS)

    1994-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (AU), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  16. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1991-11-01

    This report includes the issuances received during the specified period from the Commission (CLl), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  17. Nuclear Regulatory Commission Issuances

    International Nuclear Information System (INIS)

    1994-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Director's Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  18. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1992-03-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  19. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1991-09-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  20. Nuclear Regulatory Commission Issuances

    International Nuclear Information System (INIS)

    1994-05-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  1. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1991-07-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  2. A Bridge to Reconciliation: A Critique of the Indian Residential School Truth Commission

    Directory of Open Access Journals (Sweden)

    Marc A. Flisfeder

    2010-05-01

    Full Text Available In the past year, the Government of Canada has established the Indian Residential Schools (IRS Truth and Reconciliation Commission (TRC to address the deleterious effect that the IRS system has had on Aboriginal communities. This paper argues that the TRC as an alternative dispute resolution mechanism is flawed since it focuses too much on truth at the expense of reconciliation. While the proliferation of historical truths is of great importance, without mapping a path to reconciliation, the Canadian public will simply learn about the mistakes of the past without addressing the residual, communal impacts of the IRS system that continue to linger. The Truth and Reconciliation Commission must therefore approach its mandate broadly and in a manner reminiscent of the Royal Commission on Aboriginal Peoples of 1996.

  3. 77 FR 31378 - Secretarial Commission on Indian Trust Administration and Reform

    Science.gov (United States)

    2012-05-25

    ... DEPARTMENT OF THE INTERIOR Office of the Secretary Secretarial Commission on Indian Trust... Office of the Secretary is announcing that the Secretarial Commission on Indian Trust Administration and Reform (the Commission) will hold a public meeting on June 11 and 12, 2012. The Commission has gathered...

  4. RHIC BEAM ABORT KICKER POWER SUPPLY SYSTEM COMMISSIONING EXPERIENCE AND REMAINING ISSUES

    International Nuclear Information System (INIS)

    ZHANG, W.; AHRENS, L.A.; MI, J.; OERTER, B.; SANDERS, R.; SANDBERG, J.

    2001-01-01

    The RHIC Beam Abort Kicker Power Supply Systems commissioning experience and the remaining issues will be reported in this paper. The RHIC Blue Ring Beam Abort Kicker Power Supply System initial commissioning took place in June 1999. Its identical system in Yellow Ring was brought on line during Spring 2000. Each of the RHIC Beam Abort Kicker Power Supply Systems consists of five high voltage modulators and subsystems. These systems are critical devices for RHIC machine protection and environmental protection. They are required to be effective, reliable and operating with sufficient redundancy to safely abort the beam to its beam dump at the end of accumulation or at any time when they are commanded. To deflect 66 GeV ion beam to the beam absorbers, the RHIC Beam Abort Kicker Power Supply Systems were operated at 22 kV level. The RHIC 2000 commissioning run was very successful

  5. Undulator commissioning by characterization of radiation in x-ray free electron lasers

    Directory of Open Access Journals (Sweden)

    Takashi Tanaka

    2012-11-01

    Full Text Available In x-ray free electron lasers (XFELs where a long undulator composed of many segments is installed, there exist a number of error sources to reduce the FEL gain such as the trajectory error, K value discrepancy, and phase mismatch, which are related to the segmented-undulator structure. Undulator commissioning, which refers to the tuning and alignment processes to eliminate the possible error sources, is thus an important step toward realization of lasing. In the SPring-8 angstrom compact free electron laser (SACLA facility, the undulator commissioning has been carried out by means of characterization of x-ray radiation, i.e., measurements of the spatial and spectral profiles of monochromatized spontaneous undulator radiation as well as by probing the FEL intensity. The achieved tuning and alignment accuracies estimated from the statistics of actual measurements in SACLA show the effectiveness of this commissioning scheme.

  6. The preparation and implementation of the commissioning of Qinshan nuclear power plant

    International Nuclear Information System (INIS)

    Huang Jinyuan

    1993-05-01

    The commissioning test of Qinshan Nuclear Power Plant is summarized. The preparation stage includes the organizations, commissioning programme, network planning, commissioning items, management procedures, responsibilities and interfaces between divisions, products ordering and supplying, personal training, quality assurance and the review and supervision by National Nuclear Safety Administration etc. The implementation stage includes the commissioning programme planning, intermediate hand-over inspection of the system and equipment, inspecting conditions and setting organizations for commissioning, the transition from commissioning to operating. Finally, some experiences in the commissioning test are presented in the article

  7. Enacting localist health policy in the English NHS: the 'governing assemblage' of Clinical Commissioning Groups.

    Science.gov (United States)

    Hammond, Jonathan; Coleman, Anna; Checkland, Kath

    2018-01-01

    Objectives The Health and Social Care Act 2012 introduced Clinical Commissioning Groups to take responsibility for commissioning (i.e. planning and purchasing) the majority of services for local populations in the English NHS. Constituted as 'membership organizations', with membership compulsory for all GP practices, Clinical Commissioning Groups are overseen by, and are accountable to, a new arm's-length body, NHS England. This paper critically engages with the content and policy narrative of the 2012 Act and explores this in relation to the reality of local policy enactment. Methods Set against a careful review of the 2012 Act, a case study of a nascent Clinical Commissioning Groups was conducted. The research included observations of Clinical Commissioning Group meetings and events (87 h), and in-depth interviews (16) with clinical commissioners, GPs, and managers. Results The 2012 Act was presented as part of a broader government agenda of decentralization and localism. Clinical Commissioning Group membership organizations were framed as a means of better meeting the needs and preferences of local patients and realizing a desirable increase in localism. The policy delineated the 'governing body' and 'the membership', with the former elected from/by the latter to oversee the organization. 'The membership' was duty bound to be 'good', engaged members and to represent their patients' interests. Fieldwork with Notchcroft Clinical Commissioning Group revealed that Clinical Commissioning Groups' statutory duty to NHS England to 'ensure the continuous improvement' of GP practice members involved performance scrutiny of GP practices. These governance processes were carried out by a varied cast of individuals, many of whom did not fit into the binary categorization of membership and governing body constructed in the policy. A concept, the governing assemblage, was developed to describe the dynamic cast of people involved in shaping the work and direction of the Clinical

  8. US Nuclear Regulatory Commission, 1984 annual report. Volume 1

    International Nuclear Information System (INIS)

    1985-01-01

    This is the 10th annual report of the US Nuclear Regulatory Commission (NRC). This report covers the major activities, events, decisions and planning that took place during fiscal year 1984 (October 1983 through September 1984) within the NRC or involving the NRC. Information is presented concerning 1984 highlights and planning for 1985; reactor regulation; cleanup at Three Mile Island Unit 2; operational experience; nuclear materials; safeguards; waste management; inspection, enforcement, quality assurance, and emergency preparedness; cooperation with the States; international programs; nuclear regulatory research; proceedings and litigation; and management and communication

  9. The European Commission's light bulb decree: Another costly regulation?

    Energy Technology Data Exchange (ETDEWEB)

    Frondel, Manuel, E-mail: frondel@rwi-essen.de [Ruhr-University Bochum (RUB), Ruhr-Graduate School in Economics (RGS Econ) (Germany); Rheinisch-Westfaelisches Institut fuer Wirtschaftsforschung (RWI), Hohenzollernstr. 1-3, 45128 Essen (Germany); Lohmann, Steffen [Rheinisch-Westfaelisches Institut fuer Wirtschaftsforschung (RWI), Hohenzollernstr. 1-3, 45128 Essen (Germany); Tinbergen Institute (Netherlands)

    2011-06-15

    Since September 2009, Regulation 244/2009 of the European Commission enforces the gradual phase-out of incandescent light bulbs. As of September 2012, only energy-efficient lighting sources will be allowed for sale. Among these are halogen light bulbs, light-emitting diodes (LED), or compact fluorescent light bulbs-often referred to as energy-saving light bulbs. The Commission's justification for the phase-out of conventional light bulbs maintains that a reduction in the electricity consumed will not only lead to lower energy cost for private households and industrial consumers, but at the same time lead to a decrease in greenhouse gas emissions. This article discusses possible reasons for the slow market diffusion of energy-saving light bulbs and shows that the investment in energy-efficient light bulbs does not necessarily lead to significant cost reductions. Drawing on some illustrative examples, we demonstrate that the use of cheaper incandescent bulbs instead of energy-saving light bulbs can be economically rational in cases of rather low usage times, in which the higher initial purchasing price might only pay off after very long time spans. Furthermore, due to the coexistence with the European Emissions Trading Scheme (ETS), this regulation attains no additional emission reductions beyond those achieved by the ETS alone. We thus conclude that the general ban of incandescent light bulbs is inappropriate and should be abolished by the Commission. - Research Highlights: > This article discusses reasons for the slow market diffusion of energy-saving light bulbs. > We show that using incandescent bulbs can be rational in cases of rather low usage times. > We conclude that the general ban of incandescent light bulbs should be abolished by the Commission.

  10. Federal Energy Regulatory Commission fiscal year 1997 annual financial statements

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-24

    This report presents the results of the independent certified public accountants` audit of the Federal Energy Regulatory commission`s statements of financial position, and the related statements of operations and changes in net position. The auditors` work was conducted in accordance with generally accepted government auditing standards. An independent public accounting firm conducted the audit. The auditors` reports on the Commission`s internal control structure and compliance with laws and regulations disclosed no reportable conditions or instances of noncompliance.

  11. Law of the Energy Regulatory Commission

    International Nuclear Information System (INIS)

    1995-01-01

    This Decree-Law consist of three chapters each on divided in articles and subsections and came into force in November 1 st., 1995. Chapter I, with the heading 'Nature and Powers', defines the Energy Regulatory Commission as a decentralized organ of the Energy Secretariat with technical and operative autonomy in terms of the law, and establish the conditions for the sell, generation, exportation and importation of electricity with destination to particular and public services. The sell transport, storage and distribution of natural gas, as well as the gas liquefied from petroleum are also considered. Chapter II with the heading 'Organization and duties' establish that the Commission is integrated by five Committee, the President included. The Committee members will deliberate in collegiate manner and the decisions are by majority, having the President a vote of quality. Chapter III for 'General provisions' is related to the lawsuits arises between the Commission and the users of services. (Author)

  12. Commissioning of Nuclear Power Plants. The AREVA approach

    International Nuclear Information System (INIS)

    Mateo, G.

    2014-01-01

    Georges Mateo, Fellow Expert at AREVA, closed the last day of conferences by detailing deeply the different phases of NPPs commissioning. He insisted on the skills required to be a Commissioning engineer and on the carrier opportunities that it offers

  13. U.S. Arctic research in a technological age

    International Nuclear Information System (INIS)

    Johnson, P.L.

    1993-01-01

    The United States Arctic Research Commission was established in 1984 primarily as an advisory agency. An Interagency Arctic Research Policy Committee is one of the main recipients of the Commission's recommendations. The Committee formulated an Arctic research policy calling for research focused on national security concerns, regional development with minimal environmental or adverse social impact, and scientific research on Arctic phenomena and processes. In basic science, emphasis is placed on the need to understand Arctic processes as part of the global earth system. These processes include those that affect and are affected by climatic change. A new research program in Arctic systems science has three components: paleoenvironmental studies on ice core from Greenland; ocean-atmosphere interactions; and land-atmosphere interactions. The Commission also recognizes a need to focus on issues relevant to the Arctic as an integral component of the world economic system, since the Arctic is a significant source of petroleum and minerals. The Commission recommended that the Committee develop an Arctic engineering research plan with emphasis on such topics as oil spill prevention, waste disposal, small-scale power generation, and Arctic construction techniques. The USA is also cooperating in international Arctic research through the International Arctic Science Committee, the Arctic Environmental Protection Strategy, and the North Pacific Marine Science Organization

  14. 16 CFR 1020.1 - Why is the Commission issuing this rule?

    Science.gov (United States)

    2010-01-01

    ... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Why is the Commission issuing this rule... § 1020.1 Why is the Commission issuing this rule? (a) To state the Commission's policies on small... small businesses do not bear a disproportionate share of any burden or cost created by a Commission...

  15. 76 FR 4369 - Special Law Enforcement Commissions

    Science.gov (United States)

    2011-01-25

    ...This notice announces the online publication of the Interim Special Law Enforcement Commission Policy, Rules and Procedures, the Interim Special Law Enforcement Commission Protocols and the Interim Domestic Violence Waiver that will be used by the Office of Justice Services following passage of the Tribal Law and Order Act of 2010. The documents are published on the Indian Affairs Web site.

  16. Commissioning of the Ground Test Accelerator RFQ

    International Nuclear Information System (INIS)

    Johnson, K.F.; Sander, O.R.; Atkins, W.H.; Bolme, G.O.; Brown, S.; Connolly, R.; Garnett, R.; Gilpatrick, J.D.; Guy, F.W.; Ingalls, W.B.; Little, C.; Lohson, R.A.; Lloyd, S.; Neuschaefer, G.; Power, J.; Saadatmand, K.; Sandoval, D.P.; Stevens, R.R.; Vaughn, G.; Wadlinger, E.A.; Weiss, R.; Yuan, V.

    1992-01-01

    The Ground Test Accelerator (GTA) has the objective of verifying much of the technology (physics and engineering) required for producing high-brightness, high-current H - beams. GTA commissioning is staged to verify the beam dynamics design of each major accelerator component as it is brought on-line. The commissioning stages are the 35 key H - injector, the 2.5 MeV Radio Frequency Quadrupole (RFQ), the Intertank Matching Section (IMS), the 3.2 MeV first 2βγ Drift Tube Linac (DTL-1) module, the 8.7 MeV 2βγ DTL (modules 1--5), and the 24 MeV GTA; all 10 DTL modules. Commissioning results from the RFQ beam experiments will be presented along with comparisons to simulations

  17. Commissioning of the ground test accelerator RFQ

    International Nuclear Information System (INIS)

    Johnson, K.F.; Sander, O.R.; Atkins, W.H.; Bolme, G.O.; Brown, S.; Garnott, R.; Gilpatrick, J.D.; Guy, F.W.; Ingalls, W.B.; Little, C.; Lohsen, R.A.; Lloyd, S.; Neuschaefer, G.; Power, J.; Sandoval, D.P.; Saadatmand, K.; Stevens, R.R.Jr.; Vaughn, G.; Wadlinger, E.A.; Yuan, V.; Connolly, R.; Weiss, R.

    1992-01-01

    The Ground Test Accelerator (GTA) has the objective of verifying much of the technology (physics and engineering) required for producing high-brightness, high-current H - beams. GTA commissioning is staged to verify the beam dynamics design of each major accelerator component as it is brought on line. The commissioning stages are the 35-keV H - injector, the 2.5-MeV radio-frequency quadrupole (RFQ), the intertank matching section (IMS), the 3.2-MeV first 2-βλ drift tube linac (DTL-1) module, the 8.7-MeV 2-βλDTL (modules 1-5), and the 24-MeV GTA (all 10 DTL modules). Commissioning results from the RFQ beam experiments are presented along with comparisons with simulations. (Author) 8 refs., 9 figs

  18. State Electricity Commission of Victoria. Annual report 1984-1985

    Energy Technology Data Exchange (ETDEWEB)

    1985-01-01

    The State Electricity Commission of Victoria is a body corporate first constituted under the Electricity Commissioner's Act 1918. It now operates under the State Electricity Commission Act 1958. It generates, transmits and distributes electricity throughout Victoria's 228,000 square kilometres and supplies directly to 1.424 million customers. In addition 277,800 customers are supplied by eleven municipal authorities which purchase electricity in bulk from the Commission. The Commission also has a regulatory responsibility to ensure the safe use of electricity. It employs 22,518 people. The installed capacity of generators in the Commission's system, plus Victoria's share of Snowy and Hume generation, totalled 6603 MW at 30 June 1985 and the main transmission system comprises 500 kV, 300 kV and 220 kV lines. Corporate objectives have been developed in seven broad areas: customers,employee, finance, ntural resources, environment, conservationand community. These areas of activity are detailed in this report.

  19. The State Electricity Commission of Victoria and the greenhouse effect

    International Nuclear Information System (INIS)

    Hoy, R.D.

    1990-01-01

    The State Electricity Commission of Victoria is examining how the greenhouse issue may affect its electricity supply system in the future. Possible generation scenarios for 2005 are presented in order to show how the Toronto goal of a 20% reduction on 1988 levels of CO 2 emissions could be achieved. The main approaches to achieving these emission reductions include energy conservation and cogeneration, new gas-fired plant, use of renewable energy, reduction of energy system losses, retirement of older brown coal plant and an extensive tree planting program. It is estimated that achieving the Toronto goal would require electricity prices to rise by 1% to 1.5%, on average, each year by more than they otherwise would have, for the next 15 years. 12 refs., 3 tabs

  20. Comparison of Brokerage and Commission in Iranian Commercial Law

    Directory of Open Access Journals (Sweden)

    Manochehr Ghadami

    2017-02-01

    Full Text Available Terms such as commission and brokerage are similar in the concept of agency and in some cases they are different. In the legal system of Iran, commission section is derived from French law and it drives out the commission from the realm of agency and justifies it as an entity equal to the contract of the mandate. On the other hand, the brokerage has not been discussed in Iran’s jurisprudential sources and civil law as a legal body establishment; therefore, we can take it as new found phenomena that came to our legal system simultaneous with the commercial law concepts.  Such differences between commission agent with broker can be stated like this: the commission agent is only obliged to announce the actions and especially do his missions to the commander, in fact the commission agent has the right of disclosure before his commander, but according to the article 337 of the written law, the broker also has the right of disclosure of the details of transaction toward the party with whom the brokerage contract has not been signed. The broker is usually the middleman of the transmission in consideration of receiving a specific amount of money or he can find a party for a person who wants to conduct a transaction and he himself doesn’t get involved in the transaction and is not engaged, whereas the commission agent is directly a contracting party and the true beneficiary (commander which the transaction is done in his account has no contact with the main buyer. This survey is done by the analytical-descriptive method for comparing the brokerage and commission in the commercial law of Iran.

  1. 17 CFR 155.3 - Trading standards for futures commission merchants.

    Science.gov (United States)

    2010-04-01

    ... 17 Commodity and Securities Exchanges 1 2010-04-01 2010-04-01 false Trading standards for futures commission merchants. 155.3 Section 155.3 Commodity and Securities Exchanges COMMODITY FUTURES TRADING COMMISSION TRADING STANDARDS § 155.3 Trading standards for futures commission merchants. (a) Each futures...

  2. NSLS-II injector commissioning and initial operation

    Energy Technology Data Exchange (ETDEWEB)

    Bacha, B.; Blum, E.; Bassi, B.; Bengtsson, J.; Blednykh, A.; Buda, S.; Cheng, W.; Choi, J.; Cuppolo, J.; D Alsace, R.; Davidsaver, M.; DeLong, J.; Doom, L.; Durfee, d.; fliller, R.; Fulkerson, M.; Ganetis, G.; Gao, F.; Gardner, C.; Guo, W.; Heese, R.; Hidaka, Y.; Hu, Y.; Johanson, M.; Kosciuk, B.; Kowalski, S.; Dramer, S.; Krinsky, S.; Li, Y.; Louie, W.; Maggipinto, M.; Marino, P.; Mead, J.; Oliva, G.; Padrazo, D.; Pedersen, K.; Podobedov, B.; Rainer, R.; Rose, J.; Santana, M.; Seletskiy, S.; Shaftan, T.; Singh, O.; Singh, P.; Smalyuk, V.; Smith, R.; Summers, T.; Tagger, J.; Tian, Y.; Wahl, W.; Wang, G.; Weiner, G.; Willeke, F.; Yang, L.; Yang, X.; Zeitler, E.; Zitvogel, E.; Zuhoski, P.

    2015-05-03

    The injector for the National Synchrotron Light Source II (NSLS-II) storage ring consists of a 3 GeV booster synchrotron and a 200 MeV S-band linac. The linac was designed to produce either a single bunch with a charge of 0.5 nC of electrons or a train of bunches up to 300 ns long containing a total charge of 15 nC. The booster was designed to accelerate up to 15 nC each cycle in a train of bunches up to 300 ns long. Linac commissioning was completed in April 2012. Booster commissioning was started in November 2013 and completed in March 2014. All of the significant design goals were satisfied including beam emittance, energy spread, and transport efficiency. While the maximum booster charge accelerated was only 10 nC, this has proven to be more than sufficient for storage ring commissioning and operation. The injector has operated reliably during storage ring operation since then. Results will be presented showing measurements of linac and booster operating parameters achieved during commissioning and initial operation. Operating experience and reliability during the first year of NSLS-II operation will be discussed.

  3. Nuclear Regulatory Commission Staff practice and procedure digest. Commission, Appeal Board and Licensing Board Decision, July 1972 - June 1995

    International Nuclear Information System (INIS)

    1996-04-01

    This is the seventh edition of the Nuclear Regulatory Commission (NRC) Staff Practice and Procedure Digest. It contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period from July 1, 1972 to June 1995 interpreting the NRC rules of practice in 10 CFR part 2

  4. PROMOTER COMMISSION LEGISLATIVE AND EXTERNAL REPRESENTATIVE OF THE UNION

    Directory of Open Access Journals (Sweden)

    Nely Militaru

    2014-11-01

    Full Text Available Commission was established by the Treaty establishing the Economic Community of Coal and Osel – signed in Paris in 1951, entered into force next year –as the High Authority supranational institution with discretionary decisionmaking powers in optics of this treaty. Also known as “guardian of the treaties” Commission by its member, who exercise their functions in complete independence, is an institution that promotes the general interest of the Union (art. 17 par.TEU. Commission oversees therefore application of Union law. In this capacity, especially in terms of the competence of the legislative proposal, the Commission by calling upon specialists and experts from EU Member States harmonize with the national interest.

  5. 77 FR 2298 - Public Meeting of the Presidential Commission for the Study of Bioethical Issues

    Science.gov (United States)

    2012-01-17

    ... nation's leaders in medicine, science, ethics, religion, law, and engineering. The Commission advises the President on bioethical issues arising from advances in biomedicine and related areas of science and... research, health care delivery, and technological innovation are conducted in a socially and ethically...

  6. 19 CFR 210.49 - Implementation of Commission action.

    Science.gov (United States)

    2010-04-01

    ... 19 Customs Duties 3 2010-04-01 2010-04-01 false Implementation of Commission action. 210.49 Section 210.49 Customs Duties UNITED STATES INTERNATIONAL TRADE COMMISSION INVESTIGATIONS OF UNFAIR PRACTICES IN IMPORT TRADE ADJUDICATION AND ENFORCEMENT Determinations and Actions Taken § 210.49...

  7. Page THE ROLE OF SECURITIES AND EXCHANGE COMMISSION

    African Journals Online (AJOL)

    Fr. Ikenga

    Exchange Commission requires that important information concerning the issuer and the securities ... role of the Securities and Exchange Commission in regulating investments and securities ... relatively long periods for use by economic units with deficit funds. ..... (including bank account) of any person whose assets were.

  8. 17 CFR 200.80 - Commission records and information.

    Science.gov (United States)

    2010-04-01

    ... intelligence investigation, information furnished by a confidential source; (v) Would disclose techniques or... Commission publishes weekly the SEC Docket, which prints the full text of every Commission release. (iii) The... obtained from the Superintendent of Documents, U.S. Government Printing Office, Washington, DC 20402. (iv...

  9. 75 FR 6289 - Commission Guidance Regarding Disclosure Related to Climate Change

    Science.gov (United States)

    2010-02-08

    ... Regarding Disclosure Related to Climate Change; Final Rule #0;#0;Federal Register / Vol. 75 , No. 25... Disclosure Related to Climate Change AGENCY: Securities and Exchange Commission. ACTION: Interpretation... requirements as they apply to climate change matters. DATES: Effective Date: February 8, 2010. FOR FURTHER...

  10. [The history of the Kaiser Wilhelm Society during the Third Reich. Interim reports of the president's commission of the Max Planck Society].

    Science.gov (United States)

    Weber, M M

    2002-11-01

    In 1997 the Max Planck Society set up a presidential commission to do research on the historical development of its precursor organization, the Kaiser Wilhelm Society (KWG), during the Third Reich. This paper presents some of the important results given in the interim reports of this commission that are relevant to psychiatry. It focuses on brain research, anthropology, psychiatric genetics, and the role of the well-known biochemist Adolf Butenandt. In general, the interim reports reflect the numerous links between the biomedical research of the KWG and the institutions of the National Socialist (Nazi) state. However, they do not yet allow a final historical assessment as to the complex situation of this field of research during National Socialism.

  11. Commissioning of the CMS Hadron Forward Calorimeters Phase I Upgrade

    CERN Document Server

    Bilki, Burak

    2017-01-01

    The final phase of the CMS Hadron Forward Calorimeters Phase I upgrade is being performed during the Extended Year End Technical Stop of 2016 â?? 2017. In the framework of the upgrade, the PMT boxes are being reworked to implement two channel readout in order to exploit the benefits of the multi-anode PMTs in background tagging and signal recovery. The front-end electronics is also being upgraded to QIE10-based electronics which will implement larger dynamic range and a 6-bit TDC to eliminate the background to have an effect on the trigger. Following this major upgrade, the Hadron Forward Calorimeters will be commissioned for operation readiness in 2017. Here we describe the details and the components of the upgrade, and discuss the operational experience and results obtained during the upgrade and commissioning.

  12. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1981-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking

  13. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1982-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking

  14. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1982-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking

  15. Nuclear safety research

    International Nuclear Information System (INIS)

    1996-01-01

    The topics 'Large-sized PWR-NPP Safety Techniques Research',and 'The Key Techniques Research on the Safety Supervision and Control for Operation of Nuclear Installations' have been adopted as an apart of 'the National 9th five Year Programs for Tacking the Key Scientific and Technical Topics' which are organized by the State Planning Commission (SPC) and State Science and Technology Commission (SSTC) respectively, and have obtained a financial support from them. To play a better role with the limited fund, the NNSA laid special stress on selecting key sub-topics on nuclear safety, and carefully choosing units which would undertake sub-topics and signing technical contracts with them

  16. The need for independent research on the health effects of glyphosate-based herbicides.

    Science.gov (United States)

    Landrigan, Philip J; Belpoggi, Fiorella

    2018-05-29

    Glyphosate, formulated as Roundup, is the world's most widely used herbicide. Glyphosate is used extensively on genetically modified (GM) food crops designed to tolerate the herbicide, and global use is increasing rapidly. Two recent reviews of glyphosate's health hazards report conflicting results. An independent review by the International Agency for Research on Cancer (IARC) found that glyphosate is a "probable human carcinogen". A review by the European Food Safety Agency (EFSA) found no evidence of carcinogenic hazard. These differing findings have produced regulatory uncertainty. Reflecting this regulatory uncertainty, the European Commission on November 27 2017, extended authorization for glyphosate for another 5 years, while the European Parliament opposed this decision and issued a call that pesticide approvals be based on peer-reviewed studies by independent scientists rather than on the current system that relies on proprietary industry studies. The Ramazzini Institute has initiated a pilot study of glyphosate's health hazards that will be followed by an integrated experimental research project. This evaluation will be independent of industry support and entirely sponsored by worldwide crowdfunding. The aim of the Ramazzini Institute project is to explore comprehensively the effects of exposures to glyphosate-based herbicides at current real-world levels on several toxicological endpoints, including carcinogenicity, long-term toxicity, neurotoxicity, endocrine disrupting effects, prenatal developmental toxicity, the microbiome and multi-generational effects.

  17. 16 CFR 5.66 - Commission decision and reconsideration.

    Science.gov (United States)

    2010-01-01

    ... 16 Commercial Practices 1 2010-01-01 2010-01-01 false Commission decision and reconsideration. 5.66 Section 5.66 Commercial Practices FEDERAL TRADE COMMISSION ORGANIZATION, PROCEDURES AND RULES OF... (b) references therein to “court of appeals” shall be deemed for purposes of proceedings under this...

  18. Arizona Commission of Indian Affairs 1982 Annual Report.

    Science.gov (United States)

    Arizona Commission of Indian Affairs, Phoenix.

    Designed to provide insight into the proceedings, transactions, and findings of the Arizona Commission of Indian Affairs, this 1981-82 annual report reflects the Commission's efforts to improve communications, understanding and working relationships between tribes and state government to provide tribes with technical assistance. The report…

  19. SU-E-T-70: Commissioning a Multislice CT Scanner for X-Ray CT Polymer Gel Dosimetry

    Energy Technology Data Exchange (ETDEWEB)

    Johnston, H [University of Victoria, Victoria, BC (Australia); UT Southwestern Medical Center, Dallas, TX (United States); Hilts, M [University of Victoria, Victoria, BC (Australia); BC Cancer Agency, Kelowna, BC (Australia); Jirasek, A [University of Victoria, Victoria, BC (Australia)

    2014-06-01

    Purpose: To commission a multislice computed tomography (CT) scanner for fast and reliable readout of radiation therapy (RT) dose distributions using CT polymer gel dosimetry (PGD). Methods: Commissioning was performed for a 16-slice CT scanner using images acquired through a 1L cylinder filled with water. Additional images were collected using a single slice machine for comparison purposes. The variability in CT number associated with the anode heel effect was evaluated and used to define a new slice-by-slice background image subtraction technique. Image quality was assessed for the multislice system by comparing image noise and uniformity to that of the single slice machine. The consistency in CT number across slices acquired simultaneously using the multislice detector array was also evaluated. Finally, the variability in CT number due to increasing x-ray tube load was measured for the multislice scanner and compared to the tube load effects observed on the single slice machine. Results: Slice-by-slice background subtraction effectively removes the variability in CT number across images acquired simultaneously using the multislice scanner and is the recommended background subtraction method when using a multislice CT system. Image quality for the multislice machine was found to be comparable to that of the single slice scanner. Further study showed CT number was consistent across image slices acquired simultaneously using the multislice detector array for each detector configuration of the slice thickness examined. In addition, the multislice system was found to eliminate variations in CT number due to increasing x-ray tube load and reduce scanning time by a factor of 4 when compared to imaging a large volume using a single slice scanner. Conclusion: A multislice CT scanner has been commissioning for CT PGD, allowing images of an entire dose distribution to be acquired in a matter of minutes. Funding support provided by the Natural Sciences and Engineering

  20. Automatic Analysis at the Commissioning of the LHC Superconducting Electrical Circuits

    CERN Document Server

    Reymond, H; Charrondiere, C; Rijllart, A; Zerlauth, M

    2011-01-01

    Since the beginning of 2010 the LHC has been operating in a routinely manner, starting with a commissioning phase and then an operation for physics phase. The commissioning of the superconducting electrical circuits requires rigorous test procedures before entering into operation. To maximize the beam operation time of the LHC, these tests should be done as fast as procedures allow. A full commissioning need 12000 tests and is required after circuits have been warmed above liquid nitrogen temperature. Below this temperature, after an end of year break of two months, commissioning needs about 6000 tests. As the manual analysis of the tests takes a major part of the commissioning time, we automated existing analysis tools. We present here how these LabVIEW™ applications were automated, the evaluation of the gain in commissioning time and reduction of experts on night shift observed during the LHC hardware commissioning campaign of 2011 compared to 2010. We end with an outlook at what can be further optimized.

  1. Automatic analysis at the commissioning of the LHC superconducting electrical circuits

    International Nuclear Information System (INIS)

    Reymond, H.; Andreassen, O.O.; Charrondiere, C.; Rijllart, A.; Zerlauth, M.

    2012-01-01

    Since the beginning of 2010 the LHC has been operating in a routinely manner, starting with a commissioning phase and then an operation for physics phase. The commissioning of the superconducting electrical circuits requires rigorous test procedures before entering into operation. To maximize the beam operation time of the LHC, these tests should be done as fast as procedures allow. A full commissioning need 12000 tests and is required after circuits have been warmed above liquid nitrogen temperature. Below this temperature, after an end of year break of two months, commissioning needs about 6000 tests. As the manual analysis of the tests takes a major part of the commissioning time, we automated existing analysis tools. We present here how these LabVIEW TM applications were automated, the evaluation of the gain in commissioning time and reduction of experts on night shift observed during the LHC hardware commissioning campaign of 2011 compared to 2010. We end with an outlook at what can be further optimized. (authors)

  2. New research possibilities at the Budapest research reactor

    International Nuclear Information System (INIS)

    Hargitai, T.; Vidovszky, I.

    2001-01-01

    The Budapest Research Reactor is the first nuclear facility of Hungary. It was commissioned in 1959, reconstructed and upgraded in 1967 and 1986-92. The main purpose of the reactor is to serve neutron research. The reactor was extended by a liquid hydrogen type cold neutron source in 2000. The research possibilities are much improved by the CNS both in neutron scattering and neutron activation. (author)

  3. 17 CFR 202.10 - Policy statement of the Securities and Exchange Commission concerning subpoenas to members of the...

    Science.gov (United States)

    2010-04-01

    ... Commission. Effective journalism complements the Commission's efforts to ensure that investors receive the... the principles of the First Amendment's guarantee of freedom of the press, and specifically to avoid... following principles should guide the determination of whether a subpoena to a member of the news media...

  4. Commissioning the GTA accelerator

    International Nuclear Information System (INIS)

    Sander, O.R.; Atkins, W.H.; Bolme, G.O.; Bowling, S.; Brown, S.; Cole, R.; Gilpatrick, J.D.; Garnett, R.; Guy, F.W.; Ingalls, W.B.; Johnson, K.F.; Kerstiens, D.; Little, C.; Lohsen, R.A.; Lloyd, S.; Lysenko, W.P.; Mottershead, C.T.; Neuschaefer, G.; Power, J.; Rusthoi, D.P.; Sandoval, D.P.; Stevens, R.R.; Vaughn, G.; Wadlinger, E.A.; Connolly, R.; Weiss, R.; Saadatmand, K.

    1992-01-01

    The Ground Test Accelerator (GTA) is being used to resolve the physics and engineering issues related to accelerating, focusing, and steering a high-brightness, high-current H - beam and then neutralizing it. The goal is to produce a 24 MeV, 50 mA device with a 2% duty factor. Specific features of the GTA -- injector, beam optics, rf linac structures, diagnostics, control and rf power systems are described. The first four steps in commissioning have been completed. The RFQ predicted and measured performances are in good agreement; however, the transmission is lower than specifications. Input emittance is larger than design specifications and increases the effects of image charge and multipoles. Displacement of steering magnets in either the horizontal or vertical plane caused beam displacements in both planes. It is suspected that quadrupole rotation is the cause of the coupled motion. 9 figs., 5 tabs., 11 refs

  5. 16 CFR 1015.10 - Commission report of actions to Congress.

    Science.gov (United States)

    2010-01-01

    ... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Commission report of actions to Congress. 1015.10 Section 1015.10 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION GENERAL PROCEDURES FOR... U.S.C. 552(a) § 1015.10 Commission report of actions to Congress. On or before February 1 of each...

  6. Behind the Scenes of Public Construction Clients – Collecting Data on Commissioning Activities and Organisational Approach

    NARCIS (Netherlands)

    Hermans, M.H.; Eisma, P.R.

    2015-01-01

    The understanding of public commissioning activity is fairly limited, with national and European research primarily focusing on large scale projects, European procurement procedures and new construction. However, most construction activities involve small scale projects and assignments performed by

  7. Nuclear Regulatory Commission issuances, April 1995. Volume 41, Number 4

    International Nuclear Information System (INIS)

    1995-04-01

    This book contains issuances of the Nuclear Regulatory Commission and of the Atomic Safety and Licensing Boards, and an issuance of the Director's decision. The issuances concern a petition filed by Dr. James E Bauer seeking interlocutory Commission review of the Atomic Safety and Licensing Board's order imposing several restrictions on Dr. Bauer; a denial of an Interveners' Petition for Review addressing the application of Babcock and Wilcox for a renewal of its Special Nuclear Materials License; granting a motion for a protective order, by Sequoyah Fuel Corporation and General Atomics, limiting the use of the protected information to those individuals participating in the litigation and for the purposes of the litigation only; granting a Petitioner's petition for leave to intervene and request for a hearing concerning Georgia Institute of Technology (Georgia Tech Research Reactor) renewal of a facility license; and a denial of a petition filed by Mr. Ted Dougherty requesting a shutdown of the San Onofre Nuclear Generating Station based on concerns regarding the vulnerability of the plant to earthquakes and defensibility of the plant to a terrorist threat

  8. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1988-05-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  9. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1987-03-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  10. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1990-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  11. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1991-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  12. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1986-07-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  13. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1987-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  14. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1989-11-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Danials of Petitions for Rulemaking (DPRM)

  15. Nuclear regulatory commission issuances

    International Nuclear Information System (INIS)

    1989-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  16. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1991-05-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  17. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1988-01-01

    This report includes the issuance received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  18. Nuclear Regulatory Commission Issuances

    International Nuclear Information System (INIS)

    1986-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  19. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1991-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  20. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1990-04-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  1. Nuclear Regulatory Commission Issuances

    International Nuclear Information System (INIS)

    1988-10-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  2. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1988-04-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  3. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1991-03-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  4. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1988-06-01

    This report includes the issuances received during the specified period from the commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  5. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1982-04-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Director's Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  6. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1989-09-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  7. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1989-06-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  8. Nuclear regulatory commission issuances

    International Nuclear Information System (INIS)

    1990-07-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  9. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1987-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  10. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1990-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety And Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  11. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1985-04-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  12. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1990-09-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  13. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1982-08-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  14. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1988-08-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  15. A History of the International Commission on Non-Ionizing Radiation Protection.

    Science.gov (United States)

    Repacholi, M H

    2017-10-01

    Concern about health risks from exposure to non-ionizing radiation (NIR) commenced in the 1950s after tracking radars were first introduced during the Second World War. Soon after, research on possible biological effects of microwave radiation in the former Soviet Union and the U.S. led to public and worker exposure limits being much lower in Eastern European than in Western countries, mainly because of different protection philosophies. As public concern increased, national authorities began introducing legislation to limit NIR exposures from domestic microwave ovens and workplace devices such as visual display units. The International Radiation Protection Association (IRPA) was formed in 1966 to represent national radiation protection societies. To address NIR protection issues, IRPA established a Working Group in 1974, then a Study Group in 1975, and finally the International NIR Committee (INIRC) in 1977. INIRC's publications quickly became accepted worldwide, and it was logical that it should become an independent commission. IRPA finally established the International Commission on Non-Ionizing Radiation Protection (ICNIRP), chartering its remit in 1992, and defining NIR as electromagnetic radiation (ultraviolet, visible, infrared), electromagnetic waves and fields, and infra- and ultrasound. ICNIRP's guidelines have been incorporated into legislation or adopted as standards in many countries. While ICNIRP has been subjected to criticism and close scrutiny by the public, media, and activists, it has continued to issue well-received, independent, science-based protection advice. This paper summarizes events leading to the formation of ICNIRP, its key activities up to 2017, ICNIRP's 25th anniversary year, and its future challenges.

  16. LHC: Construction and Commissioning Status

    CERN Document Server

    Evans, Lyndon R

    2007-01-01

    The installation of the Large Hadron Collider at CERN is now approaching completion. All magnets are installed with the exception of a few inner triplet quadrupoles. The first of the eight machine sectors is cold and power tests are proceeding. Two other sectors are ready for cool down and interconnect work is proceeding at a satisfactory pace in the other five sectors. In view of a number of accumulated delays, the original plan for partial commissioning of the machine and a low energy pilot run at the end of 2007 will now have to be abandoned. Instead, the full commissioning of the machine to top energy in a single step will start once the injector chain becomes available in spring 2008.

  17. The international law commission and international environmental law

    International Nuclear Information System (INIS)

    Ramcharan, B.G.

    1975-01-01

    If the oceans are destroyed through pollution there will be nothing left to manage. Protection against pollution is thus a fundamental aspect of ocean management. What legal principles are available for the protection of the oceans. This paper brings together the relevant practice of the foremost international body responsible for the codification and development of international law: the International Law Commission. It describes the work of the Commission concerning: 1) pollution of the high seas; 2) pollution of international watercourses; and 3) international responsibility for environmental hazards. It concludes by expressing the hope that the Commission will further study, codify and develop international environmental law

  18. News from the Biological Stain Commission No. 11

    DEFF Research Database (Denmark)

    Lyon, H O; Horobin, R W

    2012-01-01

    The 11th issue of News from the Biological Stain Commission (BSC) provides our first impressions of the REACH and ECHA programs. We intend to give a more thorough account of what these important programs actually mean in later editions of News from the Biological Stain Commission. Under the heading...

  19. 28 CFR 2.207 - Supervision reports to Commission.

    Science.gov (United States)

    2010-07-01

    ... 28 Judicial Administration 1 2010-07-01 2010-07-01 false Supervision reports to Commission. 2.207 Section 2.207 Judicial Administration DEPARTMENT OF JUSTICE PAROLE, RELEASE, SUPERVISION AND RECOMMITMENT OF PRISONERS, YOUTH OFFENDERS, AND JUVENILE DELINQUENTS District of Columbia Supervised Releasees § 2.207 Supervision reports to Commission. A...

  20. 77 FR 4891 - Technical Corrections to Commission Regulations

    Science.gov (United States)

    2012-02-01

    ... 20426. 12. From the Commission's homepage on the Internet, this information is available in the Commission's document management system, eLibrary. The full text of this document is available on eLibrary in...Library, type the docket number excluding the last three digits of this document in the docket number...

  1. The programme and objectives of the Commission of the European Communities concerning radioactive wastes

    International Nuclear Information System (INIS)

    Orlowski, S.; Cricchio, A.; Girardi, F.

    1984-01-01

    The radioactive waste management programme of the Commission of the European Communities offers a good opportunity for co-operation between Member States. The Commission's principal objectives are: (1) to implement a Community action plan adopted in 1980 for a twelve-year period; (2) to promote research and development; (3) to ensure that radioactive waste management is conducted in conformity with environmental concerns and radiation protection norms. Under the action plan the current situation and prospects for radioactive waste management in the Community were evaluated in 1981-82. Other activities under the plan relate to the promotion of Community co-operation in final disposal and to the institution of a mechanism for Community consultations on criteria for the acceptance of conditioned wastes. The promotion of research and development involves a high degree of co-operation and effort to optimize or select procedures and to establish pilot or demonstration facilities. A budget of US$ 20 million at present supports these activities. With regard to radiation protection, in 1982 the Commission issued a recommendation for an investigation, at Community level, into the impact on all the Member States of operations such as waste treatment, dumping at sea, burial in the ground and storage of radioactive wastes. These objectives suggest that the solutions now under consideration for the management of high-level and long-lived wastes will by the end of this century be introduced alongside those already adopted in practice for low- and medium-level wastes. (author)

  2. NASA Construction of Facilities Validation Processes - Total Building Commissioning (TBCx)

    Science.gov (United States)

    Hoover, Jay C.

    2004-01-01

    Key Atributes include: Total Quality Management (TQM) System that looks at all phases of a project. A team process that spans boundaries. A Commissioning Authority to lead the process. Commissioning requirements in contracts. Independent design review to verify compliance with Facility Project Requirements (FPR). Formal written Commissioning Plan with Documented Results. Functional performance testing (FPT) against the requirements document.

  3. Delivery through innovation: CSIR research on water services infrastructure operation through franchising

    CSIR Research Space (South Africa)

    Wall, K

    2006-02-01

    Full Text Available There is a great need for institutional innovations aimed at improving access to basic water services in South Africa, and sustaining that improvement. In support of effective delivery, the CSIR, with the support of the Water Research Commission...

  4. STUK research projects 1998-2000; Saeteilyturvakeskuksen tutkimushankkeet 1998-2000

    Energy Technology Data Exchange (ETDEWEB)

    Salomaa, S; Eloranta, E; Heimbuerger, H; Jokela, K; Jaervinen, H

    1998-07-01

    The primary goal of STUK, the Finnish Radiation and Nuclear Safety Authority, is to prevent and limit the harmful effects of radiation. The research conducted by STUK yields new information related to the use, occurrence and effects of radiation and promotes the supervision of nuclear safety. STUK research projects 1998 - 2000 summarizes STUK`s own research projects and commissioned research designed to promote the supervision of nuclear safety. Information on the research projects and related publications is also available on STUK`s WWW pages at www.stuk.fi. The work done on the safe use of nuclear power and nuclear waste management mainly comprises commissioned research projects which derive from the needs of authorities, and are funded and directed by STUK. This research is conducted by organizations outside STUK, but supervised by STUK experts. In some cases, STUK personnel are also involved. The goal of this research work is to produce the information needed for decision-making, to develop supervisory methods and to ensure that recent developments in science and technology are taken into account in action to promote safe use of nuclear power. STUK`s own research focuses on radiation protection and the health effects of radiation. During 1998 - 2000, the main emphasis will be on projects supporting the Finnish national environmental health action plan, the health risks of radiation, emergency preparedness and cooperation with neighbouring CEE areas. EU directives on radiation protection and medical exposure to radiation also influence the course taken by research carried out at STUK. STUK`s research activities are now more international than ever; the institute is involved in more then 20 research projects funded by EU. Apart from the EU and the Nordic countries, STUK`s main partners are to be found in Russia, Estonia and the USA. (orig.)

  5. Preparation and procedures of pre-commissioning on DECY-13 cyclotron

    International Nuclear Information System (INIS)

    Silakhuddin

    2016-01-01

    A preparation and procedures for pre-commissioning of DECY-13 Cyclotron have been discussed and the steps for these have been arranged. Pre-commissioning is a testing stage of individual subsystems when all subsystems have been integrated into a cyclotron system. The discussion was taken from references, the next the readiness of devices was studied and then the preparation and procedures of the pre-commissioning were arranged. The results of the discussion are that for doing the pre-commissioning of the cyclotron DECY-13 still requires the completion of RF-dee subsystem and some components for testing are still to be completed. (author)

  6. THE STAFF ASSOCIATION'S INTERNAL COMMISSIONS A source of innovative ideas

    CERN Multimedia

    STAFF ASSOCIATION

    2010-01-01

    In the heart of the Staff Association, internal commissions carry out preparatory work which is indispensable for productive discussions in Staff Council and Executive Committee meetings. These working groups, composed of staff delegates and interested staff members, are think tanks for all subjects in the area assigned to them. Five commissions are active in 2010 : The “In-Form-Action” Commission develops a communication strategy (Information), organizes staff mobilization and action (Action) and promotes delegate training (Formation [training]), in order to enhance, support and professionalize the activities of the Staff Association. The Commission for “Employment Conditions” deals with remuneration, the advancement system, working hours, recruitment, and retention, among other things. It gives its opinion on proposals by the Management or elaborates its own proposals. The Commission for “Health and Safety” examines all aspec...

  7. Consultancy research as a barrier to strengthening social science research capacity in Uganda.

    Science.gov (United States)

    Wight, Daniel; Ahikire, Josephine; Kwesiga, Joy C

    2014-09-01

    There is a shortage of senior African social scientists available to lead or manage research in Africa, undermining the continent's ability to interpret and solve its socio-economic and public health problems. This is despite decades of investment to strengthen research capacity. This study investigated the role of individually commissioned consultancy research in this lack of capacity. In 2006 structured interviews (N = 95) and two group discussions (N = 16 total) were conducted with a fairly representative sample of Ugandan academic social scientists from four universities. Twenty-four senior members of 22 Ugandan and international commissioning organizations were interviewed. Eight key actors were interviewed in greater depth. Much of Ugandan social science research appears to take the form of small, individually contracted consultancy projects. Researchers perceived this to constrain their professional development and, more broadly, social science research capacity across Uganda. Conversely, most research commissioners seemed broadly satisfied with the research expertise available and felt no responsibility to contribute to strengthening research capacity. Most consultancy research does not involve institutional overheads and there seems little awareness of, or interest in, such overheads. Although inequalities in the global knowledge economy are probably perpetuated primarily by macro-level factors, in line with Dependency Theory, meso-level factors are also important. The current research market and institutional structures in Uganda appear to create career paths that seriously impede the development of high quality social science research capacity, undermining donor investments and professional effort to strengthen this capacity. These problems are probably generic to much of sub-Saharan Africa. However, both commissioning and research organizations seem ready, in principle, to establish national guidelines for institutional research consultancies. These

  8. 75 FR 47281 - Federal Advisory Committee; Military Leadership Diversity Commission (MLDC)

    Science.gov (United States)

    2010-08-05

    ... DEPARTMENT OF DEFENSE Federal Advisory Committee; Military Leadership Diversity Commission (MLDC..., the Department of Defense announces that the Military Leadership Diversity Commission (MLDC) will meet... Federal Officer (DFO) opens meeting. Commission Chairman opening remarks. Deliberation on the definition...

  9. Online Learning of Commission Avoidant Portfolio Ensembles

    OpenAIRE

    Uziel, Guy; El-Yaniv, Ran

    2016-01-01

    We present a novel online ensemble learning strategy for portfolio selection. The new strategy controls and exploits any set of commission-oblivious portfolio selection algorithms. The strategy handles transaction costs using a novel commission avoidance mechanism. We prove a logarithmic regret bound for our strategy with respect to optimal mixtures of the base algorithms. Numerical examples validate the viability of our method and show significant improvement over the state-of-the-art.

  10. Beam Commissioning of the PEP-II High Energy Ring

    International Nuclear Information System (INIS)

    Wienands, U.; Anderson, S.; Assmann, R.; Bharadwaj, V.; Cai, Y.; Clendenin, J.; Corredoura, P.; Decker, F.J.; Donald, M.; Ecklund, S.; Emma, P.; Erickson, R.; Fox, J.; Fieguth, T.; Fisher, A.; Heifets, S.; Hill, A.; Himel, T.; Iverson, R.; Johnson, R.; Judkins, J.; Krejcik, P.; Kulikov, A.; Lee, M.; Mattison, T.; Minty, M.; Nosochkov, Y.; Phinney, N.; Placidi, M.; Prabhakar, S.; Ross, M.; Smith, S.; Schwarz, H.; Stanek, M.; Teytelman, D.; Traller, R.; Turner, J.; Zimmermann, F.; Barry, W.; Chattopadhyay, S.; Corlett, J.; Decking, W.; Furman, M.; Nishimura, H.; Portmann, G.; Rimmer, R.; Zholents, A.; Zisman, M.; Kozanecki, W.; Hofmann, A.; Zotter, B.; Steier, C.; Bialowons, W.; Lomperski, M.; Lumpkin, A.; Reichel, I.; Safranek, J.; Smith, V.; Tighe, R.; Sullivan, M.; Byrd, J.; Li, D.

    1998-01-01

    The PEP-II High Energy Ring (HER), a 9 GeV electron storage ring, has been in commissioning since spring 1997. Initial beam commissioning activities focused on systems checkout and commissioning and on determining the behavior of the machine systems at high beam currents. This phase culminated with the accumulation of 0.75 A of stored beam-sufficient to achieve design luminosity--in January 1998 after 3.5 months of beam time. Collisions with the 3 GeV positron beam of the Low Energy Ring (LER) were achieved in Summer of 1998. At high beam currents, collective instabilities have been seen. Since then, commissioning activities for the HER have shifted in focus towards characterization of the machine and a rigorous program to understand the machine and the beam dynamics is presently underway

  11. 47 CFR 1.14 - Citation of Commission documents.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Citation of Commission documents. 1.14 Section... Rules of Practice and Procedure General § 1.14 Citation of Commission documents. The appropriate reference to the FCC Record shall be included as part of the citation to any document that has been printed...

  12. 1992 Nuclear Regulatory Commission Annual Report

    International Nuclear Information System (INIS)

    1993-01-01

    This is the 18th annual report of the US Nuclear Regulatory Commission (NRC), covering events and activities occurring in fiscal year 1992 (the year ending September 30, 1992), with some treatment of events from the last quarter of calendar year 1992. The NRC was created by enactment in the Congress of the Energy Reorganization Act of 1974. It is an independent agency of the Federal Government. The five NRC Commissioners are nominated by the President and confirmed by the United States Senate. The Chairman of the Commission is appointed by the President from among the Commissioners confirmed

  13. The response of the Government of Ontario to the final report of the Royal Commission on Electric Power Planning

    International Nuclear Information System (INIS)

    1981-05-01

    In March 1980, after nearly five years of hearings and research, the Ontario Royal Commission on Electric Power Planning submitted the first volume of its final report. The remaining eight volumes were submitted in April 1980. The Commission made 88 recommendations on technical, operational, and policy issues. The present document sets out the Ontario government's response to the recommendations. The government accepts and is implementing 77 recommendations. Four recommendations require further study, and six have been rejected

  14. 78 FR 29159 - Electric Power Research Institute; Seismic Evaluation Guidance

    Science.gov (United States)

    2013-05-17

    ... NUCLEAR REGULATORY COMMISSION [NRC-2013-0038] Electric Power Research Institute; Seismic... U.S. Nuclear Regulatory Commission (NRC) is issuing an endorsement letter of Electric Power Research... Fukushima Dai-ichi nuclear power plant in March 2011. Enclosure 1 to the 50.54(f) letter requests licensees...

  15. The practice of commissioning healthcare from a private provider: learning from an in-depth case study.

    Science.gov (United States)

    Chambers, Naomi; Sheaff, Rod; Mahon, Ann; Byng, Richard; Mannion, Russell; Charles, Nigel; Exworthy, Mark; Llewellyn, Sue

    2013-01-01

    The direction of health service policy in England is for more diversification in the design, commissioning and provision of health care services. The case study which is the subject of this paper was selected specifically because of the partnering with a private sector organisation to manage whole system redesign of primary care and to support the commissioning of services for people with long term conditions at risk of unplanned hospital admissions and associated service provision activities. The case study forms part of a larger Department of Health funded project on the practice of commissioning which aims to find the best means of achieving a balance between monitoring and control on the one hand, and flexibility and innovation on the other, and to find out what modes of commissioning are most effective in different circumstances and for different services. A single case study method was adopted to explore multiple perspectives of the complexities and uniqueness of a public-private partnership referred to as the "Livewell project". 10 single depth interviews were carried out with key informants across the GP practices, the PCT and the private provider involved in the initiative. The main themes arising from single depth interviews with the case study participants include a particular understanding about the concept of commissioning in the context of primary care, ambitions for primary care redesign, the importance of key roles and strong relationships, issues around the adoption and spread of innovation, and the impact of the current changes to commissioning arrangements. The findings identified a close and high trust relationship between GPs (the commissioners) and the private commissioning support and provider firm. The antecedents to the contract for the project being signed indicated the importance of leveraging external contacts and influence (resource dependency theory). The study has surfaced issues around innovation adoption in the healthcare context

  16. The reorganisation of the French Atomic Energy Commission

    International Nuclear Information System (INIS)

    Glaize, G.

    1977-01-01

    The Atomic Energy Commission (CEA) has somewhat distinctive features when compared to other French public administrations. The Commission had been designed, when created in 1945, as a body very close to the Head of Government with, at the same time, great freedom of action; these two aspects demonstrated the importance accorded to its duties and the desire to assure its efficiency. The evolution of the Commission subsequently resulted in reducing these differences and strengthening the ministerial supervision as well as the role of the Administrator-General as compared with that of the High Commissioner. In the 1970s the Commission's structures developed in another direction, in view of the reorientation of its duties in the perspective of the development of the private nuclear sector and the increasing importance of nuclear safety questions. This reorganisation resulted in the creation of fairly autonomous operational units and a number of subsidiary bodies and specialised institutes. The outcome of this exercise has been to give the CEA a very diversified structure which is not as centralised as previously. (NEA) [fr

  17. MDT Commissioning Procedures Guidelines for Certifying RFI Chambers

    CERN Document Server

    Beretta, M; Branchini, P; Kourkoumelis, C; Dubbert, J; Gazis, E N; Hertenberger, R; Hurst, P; Kojine, A; Lanza, A; Marin, A; Mockett, P; Petridou, C; Tskhadadze, E G; Valente, P; Wotschack, J; Xie, Y; Zhao, Z

    2004-01-01

    Aim of the document is the definition of a common set of guidelines and test procedures for commissioning the MDT chambers. Commissioning is different for Barrel and Endcap chambers. The former will be tested at a single chamber level before going to the ATLAS pit, ready for the last quick test before final installation, while the latter will be first tested at a single chamber level (phase one), then installed into the Small and Big Wheel sectors (SW and BW), tested after the integration (phase two) and transported to the ATLAS pit for final wheel installation. The present document concerns all tests, including those of phase two for Endcap chambers, but it is possible that some specific tests, at the moment not planned, will be implemented during the Endcap phase two commissioning. It is composed of three sections: 1 â€" Guidelines for checking chamber conformity, where the main rules for declaring that chambers conform to the reference drawings and requirements are described; 2 â€" Commissioning tests,...

  18. 77 FR 43855 - Secretarial Commission on Indian Trust Administration and Reform

    Science.gov (United States)

    2012-07-26

    ... Secretary regarding termination. The following items will be on the agenda: Trust Commission Operations... DEPARTMENT OF THE INTERIOR Office of the Secretary Secretarial Commission on Indian Trust... Office of the Secretary is announcing that the Secretarial Commission on Indian Trust Administration and...

  19. Physical security at research reactors

    International Nuclear Information System (INIS)

    Clark, R.A.

    1977-01-01

    Of the 84 non-power research facilities licensed under 10 CFR Part 50, 73 are active (two test reactors, 68 research reactors and three critical facilities) and are required by 10 CFR Part 73.40 to provide physical protection against theft of SNM and against industrial sabotage. Each licensee has developed a security plan required by 10 CFR Part 50.34(c) to demonstrate the means of compliance with the applicable requirements of 10 CFR Part 73. In 1974, the Commission provided interim guidance for the organization and content of security plans for (a) test reactors, (b) medium power research and training reactors, and (c) low power research and training reactors. Eleven TRIGA reactors, with power levels greater than 250 kW and all other research and training reactors with power levels greater than 100 kW and less than or equal to 5,000 kW are designated as medium power research and training reactors. Thirteen TRIGA reactors with authorized power levels less than 250 kW are considered to be low power research and training reactors. Additional guidance for complying with the requirements of 73.50 and 73.60, if applicable, is provided in the Commission's Regulatory Guides. The Commission's Office of Inspection and Enforcement inspects each licensed facility to assure that an approved security plan is properly implemented with appropriate procedures and physical protection systems

  20. 2. Annual report of the Electronuclear Energy Information Commission

    International Nuclear Information System (INIS)

    Anon.

    1980-01-01

    During its second year of operation, the Electronuclear Energy Information Commission concentrated its efforts on current issues and the conditions and limits of information in the nuclear field. The Commission consulted official organizations (EDF, CEA, Ministry of Industry) as well as trade-union members, politicians and independent individuals of all opinions on electronuclear programs, the problem of 'cracks' discovered in some French reactors and on the public utility enquiry conducted for Plogoff. The Commission also studied the activities of the Ministry of Education in the training of young people in the type of reasoning necessary when faced with complex technical problems. The Commission emphasizes that information policies cannot be valid unless they are preceeded by, or at least accompanied by an appropriate and sufficient amount of education. The debates that took place on the various different topics arising are presented in the eleven following annexes: 1/ decree of November 10th, 1977 concerning the setting up of the Electronuclear Information Commission; 2/ composition of the Commission; 3/ the Harrisburg plant accident (United States); 4/ the 'cracks' observed in some French reactors; 5/ storage and processing of nuclear wastes; 6/ informing the population living in the vicinity of a nuclear plant; 7/ comparative electricity generation costs; 8/ hearing of syndical, political, and ecological organizations; 9/ information on nuclear energy in schools; 10/ quantitative comparisons of the pollution associated with various means; 11/ the realization of impact studies to Plogoff [fr

  1. Ethical Principles, Process, and the Work of Bioethics Commissions.

    Science.gov (United States)

    Sulmasy, Daniel P

    2017-05-01

    Shortly after the Presidential Commission for the Study of Bioethical Issues was constituted in 2010 and days before the commission members were to join a conference call to discuss possible topics for their deliberation, Craig Venter held a press conference announcing that his lab had created a synthetic chromosome for a species of mycoplasma and had inserted this genetic material into organisms of another species of mycoplasma (the genes of which had been deactivated), transforming the host species into the donor species. While not overtly claiming to have "created life in the test tube," Venter's publicity seemed cleverly designed to provoke the media into reporting his discovery in just that way. The resulting uproar caused President Obama to give his new bioethics commission the assignment of investigating the ethics of the emerging field of synthetic biology. The commission went right to work. It formed working groups to deliberate about parts of the report, feeding ideas and language to the staff members who would do the actual writing, and then present the working group suggestions to the commission as a whole for public deliberation at open meetings. One of those working groups was charged with coming up with ethical principles that would guide the analysis. Having served as a member of that working group, I report here on the process by which these principles emerged and reflect upon the suitability of that process for the work of public bioethics commissions. © 2017 The Hastings Center.

  2. Virtual commissioning of automated micro-optical assembly

    Science.gov (United States)

    Schlette, Christian; Losch, Daniel; Haag, Sebastian; Zontar, Daniel; Roßmann, Jürgen; Brecher, Christian

    2015-02-01

    In this contribution, we present a novel approach to enable virtual commissioning for process developers in micro-optical assembly. Our approach aims at supporting micro-optics experts to effectively develop assisted or fully automated assembly solutions without detailed prior experience in programming while at the same time enabling them to easily implement their own libraries of expert schemes and algorithms for handling optical components. Virtual commissioning is enabled by a 3D simulation and visualization system in which the functionalities and properties of automated systems are modeled, simulated and controlled based on multi-agent systems. For process development, our approach supports event-, state- and time-based visual programming techniques for the agents and allows for their kinematic motion simulation in combination with looped-in simulation results for the optical components. First results have been achieved for simply switching the agents to command the real hardware setup after successful process implementation and validation in the virtual environment. We evaluated and adapted our system to meet the requirements set by industrial partners-- laser manufacturers as well as hardware suppliers of assembly platforms. The concept is applied to the automated assembly of optical components for optically pumped semiconductor lasers and positioning of optical components for beam-shaping

  3. Joint US Geological Survey, US Nuclear Regulatory Commission workshop on research related to low-level radioactive waste disposal, May 4-6, 1993, National Center, Reston, Virginia; Proceedings

    Science.gov (United States)

    Stevens, Peter R.; Nicholson, Thomas J.

    1996-01-01

    This report contains papers presented at the "Joint U.S. Geological Survey (USGS) and U.S. Nuclear Regulatory Commission (NRC) Technical Workshop on Research Related to Low-Level Radioactive Waste (LLW) Disposal" that was held at the USGS National Center Auditorium, Reston, Virginia, May 4-6, 1993. The objective of the workshop was to provide a forum for exchange of information, ideas, and technology in the geosciences dealing with LLW disposal. This workshop was the first joint activity under the Memorandum of Understanding between the USGS and NRC's Office of Nuclear Regulatory Research signed in April 1992.Participants included invited speakers from the USGS, NRC technical contractors (U.S. Department of Energy (DOE) National Laboratories and universities) and NRC staff for presentation of research study results related to LLW disposal. Also in attendance were scientists from the DOE, DOE National Laboratories, the U.S. Environmental Protection Agency, State developmental and regulatory agencies involved in LLW disposal facility siting and licensing, Atomic Energy Canada Limited (AECL), private industry, Agricultural Research Service, universities, USGS and NRC.

  4. United State Nuclear Regulatory Commission staff practice and procedure digest: Commission, Appeal Board, and Licensing Board decisions, July 1972--June 1988

    International Nuclear Information System (INIS)

    1989-04-01

    This fifth edition of the NRC Staff Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period from July 1, 1972 to June 30, 1988 interpreting the NRC's Rules of Practice in 10 CFR Part 2. This edition replaces in their entirety earlier editions and supplements and includes appropriate changes reflecting the amendments to the Rules of Practice effective through June 30, 1988

  5. 77 FR 64534 - Secretarial Commission on Indian Trust Administration and Reform

    Science.gov (United States)

    2012-10-22

    ... DEPARTMENT OF THE INTERIOR Office of the Secretary Secretarial Commission on Indian Trust... Office of the Secretary is announcing that the Secretarial Commission on Indian Trust Administration and Reform (the Commission) will hold a public webinar meeting on November 7, 2012. The objectives of the...

  6. 77 FR 24974 - Secretarial Commission on Indian Trust Administration and Reform

    Science.gov (United States)

    2012-04-26

    ... DEPARTMENT OF THE INTERIOR Office of the Secretary Secretarial Commission on Indian Trust... Office of the Secretary is announcing that the Secretarial Commission on Indian Trust Administration and Reform (the Commission) will hold a public webinar meeting on May 16, 2012. Having gathered valuable...

  7. 16 CFR 1009.8 - Policy on establishing priorities for Commission action.

    Science.gov (United States)

    2010-01-01

    ... involves an analysis of the extent to which the product and other factors such as consumer behavior are... Commission action. 1009.8 Section 1009.8 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION GENERAL... action. (a) This document states the Consumer Product Safety Commission's policy on establishing...

  8. 17 CFR 200.42 - Disposition of business by seriatim Commission consideration.

    Science.gov (United States)

    2010-04-01

    ... 17 Commodity and Securities Exchanges 2 2010-04-01 2010-04-01 false Disposition of business by... EXCHANGE COMMISSION ORGANIZATION; CONDUCT AND ETHICS; AND INFORMATION AND REQUESTS Disposition of Commission Business § 200.42 Disposition of business by seriatim Commission consideration. (a) Whenever the...

  9. 17 CFR 200.40 - Joint disposition of business by Commission meeting.

    Science.gov (United States)

    2010-04-01

    ... 17 Commodity and Securities Exchanges 2 2010-04-01 2010-04-01 false Joint disposition of business... EXCHANGE COMMISSION ORGANIZATION; CONDUCT AND ETHICS; AND INFORMATION AND REQUESTS Disposition of Commission Business § 200.40 Joint disposition of business by Commission meeting. Any meeting of the...

  10. Comparison of Brokerage and Commission in Iranian Commercial Law

    OpenAIRE

    Manochehr Ghadami; Ali Radan Jebelli

    2017-01-01

    Terms such as commission and brokerage are similar in the concept of agency and in some cases they are different. In the legal system of Iran, commission section is derived from French law and it drives out the commission from the realm of agency and justifies it as an entity equal to the contract of the mandate. On the other hand, the brokerage has not been discussed in Iran’s jurisprudential sources and civil law as a legal body establishment; therefore, we can take it as new found phenomen...

  11. Potential environmental effects of 765-kV transmission lines: views before the New York State Public Service Commission, Cases 26529 and 26559, 1976-1978

    Energy Technology Data Exchange (ETDEWEB)

    Scott-Walton, B.; Clark, K. M.; Holt, B. R.; Jones, D. C.; Kaplan, S. D.; Krebs, J. S.; Polson, P.; Shepherd, R. A.; Young, J. R.

    1979-11-01

    Testimony given before the New York Public Service Commission in two recent cases on the potential environmental effects of 765-kV overhead ac transmission lines is reviewed. The testimony focused on the potential effects of audible noise, on the potential biological effects of the electromagnetic fields, on the potential for electric shocks to people who touch vehicles parked under the proposed lines, on the potential effects of the electromagnetic fields on electronic cardiac pacemakers, and on potential effects of ozone produced by corona discharge from the lines. The testimony fully explored these questions; however, it did not resolve all of them. The testimony indicates potential impacts from the audible noise and from the electrostatic shocks that people can receive when they touch a large vehicle parked under the lines. The testimony also indicates that certain cardiac pacemaker and lead combinations may, under certain circumstances, undergo reversion to a fixed rate of pacing in the presence of the fields under the lines, but that little risk to cardiac patients results except possibly for those patients for whom competition between the heart's own rate and the pacemaker rate presents a health risk. The testimony fails to demonstrate biological hazards from the field; further research is necessary to understand better the effects of the fields on biological systems. The testimony indicates that ozone produced by the lines will not significantly affect the environment.

  12. The Commission of European Communities project 'mirage' (migration of radionuclides in the geosphere)

    International Nuclear Information System (INIS)

    Come, B.

    1984-01-01

    The co-ordinated project 'MIRAGE' on Migration of Radionuclides in the Geosphere corresponds to the follow-up, from 1983 onwards, of the present activities of the laboratories of the Member States, up to the end of 1984, and of the Joint Research Centre at Ispra, up to the end of 1983. It is concentrated upon the study of the transfer of radioactivity from conditioned waste through the different barriers up to the interface between the geosphere and the biosphere. The MIRAGE project is performed in the framework of the Commission of European Communities (CEC) indirect action programme on Management and Storage of Radioactive Waste, sub-programme Undergound Disposal, and of the CEC direct action programme on Safety of Nuclear Materials at the Joint Research Centre, Ispra Establishment. The total financial commitment in this project is at present 6,384,000 ECU for 1983 and 1984 and the Commission participates financially in each study selected on a cost-sharing basis to a level of about 40% of the total cost. The costs of the studies performed at JRC-Ispra are not included in this amount. The number of organizations, firms and laboratories involved in this project comes to about 40

  13. Decommissioning and radioactive waste management. The European Commission overview

    International Nuclear Information System (INIS)

    Rehak, M

    2010-01-01

    In this lecture author deals with the European Commission overview on the decommissioning and radioactive waste management. Financial support of European Commission of decommissioning of the Ignalina NPP, Bohunice V1 NPP and Kozloduy Units 1 and 2 is presented.

  14. 78 FR 5829 - Secretarial Commission on Indian Trust Administration and Reform

    Science.gov (United States)

    2013-01-28

    ... Secretarial Commission on Indian Trust Administration and Reform will hold a public meeting on February 12 and... trust reform. The Commission will also host a youth outreach session on February 11, 2013, at the... DEPARTMENT OF THE INTERIOR Office of the Secretary Secretarial Commission on Indian Trust...

  15. 75 FR 8731 - Proposed Appointment to the National Indian Gaming Commission

    Science.gov (United States)

    2010-02-25

    ... National Indian Gaming Commission ACTION: Notice. SUMMARY: The Indian Gaming Regulatory Act provides for a three-person National Indian Gaming Commission. One member, the chairman, is appointed by the President... as an associate member of the National Indian Gaming Commission for a term of 3 years. DATES...

  16. 22 CFR 91.3 - Assistance to Customs and Tariff Commission representatives.

    Science.gov (United States)

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Assistance to Customs and Tariff Commission... CONTROLS § 91.3 Assistance to Customs and Tariff Commission representatives. Consular officers shall render all proper assistance to Customs and Tariff Commission representatives abroad to aid them in the...

  17. Continuity and enhancement of quality management during commissioning of W7-X

    Energy Technology Data Exchange (ETDEWEB)

    Vilbrandt, Reinhard, E-mail: reinhard.vilbrandt@ipp.mpg.de; Bosch, Hans-Stephan; Feist, Jost-Henrich; Klinger, Thomas

    2015-10-15

    Highlights: • Commissioning follows the W7-X structure into appropriate components, subsystems and systems. • Local and integrated commissioning steps are carried out alternately. • An exact and detailed preparation of all commissioning is absolutely necessary. • Templates support instruction manuals, safety analyses, and commissioning instructions. • Because of safety special attention must be paid to the first putting into service. - Abstract: The commissioning of Wendelstein 7-X, the first numerically optimized stellarator, is a new phase in the project. The general planning and execution of the commissioning of the entire W7-X system follow its structure into appropriate components, subsystems and systems. The approach for taking these systems into operation will lead to so-called local commissioning which is usually executed for individual systems in connection with the necessary peripheral devices and auxiliary systems. The subsequent step-wise testing and commissioning of the systems in connection with the central device of W7-X, including the central safety control, and the central data acquisition system is performed in the second step, the so-called integrated commissioning. This leads directly to the preparation of first plasma operation. New organizational and quality management elements have been added to the running system, or existing, proven tools have been modified. The major new organizational structures and tasks and the quality planning and assurance tools are described in more detail. The experience during the first commissioning steps of the vacuum and cryogenic systems is outlined.

  18. Nuclear Regulatory Commission Issuances

    International Nuclear Information System (INIS)

    1981-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  19. Visit of Mr. Susumu Yoda, Japanese Atomic Energy Commission, Mr. Nobuo Natsume, Vice-President, Central Research Institute of Electric Power Industry, Japan (CRIEPI), Mr. Nobuya Yoshiki, CRIEPI, Mrs. Seiko Ichikawa, Interpreter, with Mr. Taylor of CERN, visiting SM18

    CERN Multimedia

    Laurent Guiraud

    2000-01-01

    Visit of Mr. Susumu Yoda, Japanese Atomic Energy Commission, Mr. Nobuo Natsume, Vice-President, Central Research Institute of Electric Power Industry, Japan (CRIEPI), Mr. Nobuya Yoshiki, CRIEPI, Mrs. Seiko Ichikawa, Interpreter, with Mr. Taylor of CERN, visiting SM18

  20. Report of the State of Nevada Commission on Nuclear Projects

    International Nuclear Information System (INIS)

    1988-11-01

    Chapter One of the report presents a brief overview of the commission's functions and statutory charges. It also contains a summary of developments which have affected the overall nuclear waste disposal issue since the last Commission report was published. This chapter summarizes the Nuclear Waste Policy Amendments Act of 1987 (NWPAA), which significantly modified federal waste disposal policy and identified Nevada's Yucca Mountain as the only site to be evaluated for suitability as a nuclear waste repository. Chapter Two contains a synthesis of Commission activities and reports on the findings of the Commission relative to the geotechnical, environmental, socioeconomic, transportation, intergovernmental and legal aspects of federal and state nuclear waste program efforts. Chapter Three of the report presents recommendations which the Commission is making to the 1989 Nevada Legislature, the governor, and others concerned with matters surrounding the proposed high-level nuclear waste repository at Yucca Mountain and with repository-related activities, such as the transportation of radioactive materials