WorldWideScience

Sample records for edificios sin muros

  1. Reforma de edificios antiguos. El rasgado de huecos en muros de carga

    OpenAIRE

    Soto Pardo, M.

    1985-01-01

    La apertura de huecos en muros de carga es una operación frecuente en la reforma de edificios antiguos. Una correcta ejecución exige la puesta en carga de la estructura sustentante —normalmente un pórtico metálico— mediante gatos hidráulicos o algo similar, cosa que suele omitirse, dando lugar a dos problemas diferentes: uno, el desprendimiento diferido del área de descarga, con alarmantes fisuraciones y otro, sin efectos ostensibles, pero mucho más peligroso, como es la sobrecarga elevadísim...

  2. Edificio Adriaan Volker, en Rotterdam – Holanda

    Directory of Open Access Journals (Sweden)

    van Dommelen Kross, Maaskant

    1975-12-01

    Full Text Available The main characteristic of this 17 storey building that is designed for the offices of the firm «Adriaan Volker» is its very irregular shape with projecting and re-entrant parts over the entire construction. The building consists of two vertical communication shafts containing staircases, lifts, hoists and W.Cs. These shafts are on each floor surrounded by offices that are planned in an open manner, a space saving method to avoid corridors. The structure is of concrete with double T slabs for the ceiling and 43 cm thick prefabricated supporting walls. The unit is being completed by an adjacent 3 storey garage construction and sorrounding gardens.La característica principal en el diseño del edificio de 17 plantas, destinado a oficinas para la firma Adriaan Volker, es su forma muy irregular, con cuerpos entrantes y salientes que se mantienen en toda su altura. El edificio consta de dos núcleos de comunicación vertical que contienen escaleras, ascensores, montacargas y aseos, rodeados en cada planta por las oficinas, dispuestas según el tipo abierto, por la economía de espacio que supone la supresión de pasillos. La estructura del edificio es de hormigón, con dobles losas en T para los forjados, y muros portantes prefabricados de 43 cm de espesor. El edificio se completa con una construcción adyacente de tres plantas, destinadas a garaje, y unas zonas ajardinadas.

  3. Edificio La Torre de Lyon – Francia

    Directory of Open Access Journals (Sweden)

    Milh, A. H.

    1973-02-01

    Full Text Available This article describes an office building composed of a two-level underground garage, a commercial main floor, sixteen office stories, and the top floor for general installations. The structure consists of pile foundations, walls and pillars of reinforced concrete, special bases and ribbed flooring structures prefabricated by the HISA system and fitted with ducts for the various installations; acoustical insulation insured by a floating base plate of the «Assour» type, in addition to special linings; curtain walls on the outside and inside partitions of the «Cloisall» type.Se trata de un edificio de oficinas, compuesto de dos sótanos de garaje, planta baja comercial, dieciséis plantas de oficinas y una superior de instalaciones. Se ha construido a base de: cimientos sobre pilotes; muros y pilares de hormigón armado; placas especiales y nervadas de forjados, prefabricadas por el sistema «HISA», provistas de conductos para el paso de las diferentes instalaciones; aislamiento acústico asegurado por una placa flotante tipo «Assour», además de revestimientos especiales; muros-cortina al exterior, y divisiones internas tipo «Cloisall».

  4. Análisis estático - dinámico y diseño sismoresistente de un pórtico de concreto armado con muro de corte

    OpenAIRE

    Torres Limache, Paula Cristina; Torres Limache, Paula Cristina; Torres Limache, Paula Cristina

    1997-01-01

    El trabajo de ingeniería denominado “Análisis Estático -Dinámico y Diseño Sismo-Resistente de un Pórtico de Concreto Armado con Muro de Corte” presenta el análisis estático, dinámico y diseño de los principales elementos conformantes de un pórtico de concreto armado con muro de corte de un edificio de 6 pisos diseñado para el uso de oficinas. Se ha realizado con la finalidad de esclarecer y estudiar conceptos de estructuración y diseño de los elementos : columnas. vigas, placas y cimentaci...

  5. 2 obras de Fisac en Madrid: Edificio «Vega» para oficinas y vivienda unifamiliar en Somosaguas

    Directory of Open Access Journals (Sweden)

    Fisac, M.

    1967-11-01

    Full Text Available 2 Buildings by M. Fisac «Vega» office building in Madrid This aesthetically thought out building is eminently urban, with natural gardens and no enclosing fences or artificial obstacles separating the site from the street. The «Vega» building comprises a central block, with the vertical communications, including stairs and three lifts, and and three wings that correspond to the triangular shape of the site. The basic constructional mediiun, which has been very wisely used, both for the paraments and flooring, is untreated reinforced concrete. Single family dwelling at Somosaguas, Madrid The various zones of the building have been planned mainly in relation to their orientation, so that the living zone faces to the South, and the bedrooms are on the East. Also, the separate parts of the building are situated at various levels, to have as much sunshine as possible, and achieve optimum adaptation to the site profile. The garden is also planned on multiple levels in accord with the ground topography. In this building, too, untreated concrete has been adopted almost exclusively, together with precast units and granite stone.Edificio «Vega» para oficinas, en Madrid Estéticamente concebido con un carácter eminentemente urbano, con ajardinamientos libres, sin vallas ni obstáculos a las calles colindantes, dicho edificio «Vega» está compuesto: — por un nudo central, en el que están situados los enlaces verticales: una escalera y tres ascensores; — y tres ramas que corresponden a los tres vértices del triángulo del solar. El material fundamental y sabiamente empleado en estructura y forjados, es el hormigón armado visto. Vivienda unifamiliar en Somosaguas, Madrid La composición de las distintas ZONAS del edificio se ha hecho atendiendo, principalmente, a las características de vistas y orientación, quedando, a mediodía, la zona de estar, y a saliente, la de dormitorios. Asimismo, las diversas partes del edificio aparecen

  6. Comparación entre redes de fibras sintéticas y redes de fibras de cáñamo para el refuerzo de muros de albañileria = Comparison between synthetic fiber networks and hemp fiber networks for the reinforcement of masonry walls

    Directory of Open Access Journals (Sweden)

    Alessandra Vilardi

    2016-12-01

    Full Text Available La existencia de una gran cantidad de edificios antiguos ha movilizado la investigación para estudiar nuevos sistemas de refuerzo a aquellas construcciones que sean dañadas por decadencia fisiológica o por terremoto. El presente documento demuestra la eficacia de un sistema de refuerzo innovador para los muros de mampostería, constituyentes los elementos estructurales de los edificios históricos. Se hace una comparación entre unas redes bidireccionales de fibras sintéticas tradicionales y las de fibras naturales, ambas pegadas a las dos fachadas del muro con matriz de mortero. El resultado muestra la aplicación de las fibras de cáñamo como refuerzo sísmico y una mayor compatibilidad de estas con el material que caracterizan los edificios antiguos. Abstract The existence of a large number of old buildings has mobilized research to study new systems of reinforcement to those buildings that are damaged by physiological decay or earthquake. This document demonstrates the effectiveness of an innovative reinforcement system for masonry walls, which are the structural elements of historic buildings. A comparison is made between bidirectional networks of traditional synthetic fibers and those of natural fibers, both glued to the two facades of the wall with mortar matrix. The result shows the application of hemp fibers as seismic reinforcement and a greater compatibility of these with the material that characterize the old buildings.

  7. Los tres muros de Paimio

    Directory of Open Access Journals (Sweden)

    Julio Grijalba Bengoetxea

    2017-04-01

    Full Text Available La trayectoria de Alvar Aalto es ciertamente compleja y ha sido relatada por la historiografía oficial diseccionada en etapas más o menos definidas por familias unitarias de proyectos en el tiempo. Así, el sanatorio de Paimio ha pasado a la historia de la arquitectura como la consolidación del Proyecto Moderno en Finlandia, protagonizando, aparentemente, su momento de mayor ortodoxia. Aalto se sintió atraído, desde sus comienzos, por la posibilidad de generar un discurso proyectual propio. Encontró que investigar en torno a la capacidad evocadora de la conciliación de los opuestos le permitía disponer de instrumentos eficaces al servicio del proyecto. La singular presencia de elementos opuestos dialogando define la tarea rectora de una manera de hacer en arquitectura. En Paimio algunas verdades se resisten a ser ocultadas bajo la uniformidad moderna aparente, tantas veces exaltada. Todo ello se revela en innumerables episodios, pero es especialmente visible en la singular composición de los tres muros de las habitaciones. El muro moderno que resulta ingrávido desde su condición abstracta. El muro pesado, definido a través de sus cualidades materiales, vinculado a la tradición decimonónica. Y finalmente el muro inmaterial, dotado de atributos próximos a la invisibilidad, de profundas referencias orientales.

  8. Edificio de asistencia social de la CIBA. Basilea

    Directory of Open Access Journals (Sweden)

    Suter y Suter, Arquitectos

    1961-03-01

    Full Text Available Cada vez se hace más frecuente la construcción de edificios destinados a una función social —comedores, salas de conferencias y proyecciones, salones de exposiciones— dentro del programa orgánico de las grandes industrias. Esto, sin duda, contribuye poderosamente a la confraternización del personal que, así, trabaja, come y se distrae en unión de sus jefes y de sus compañeros.

  9. Edificios industriales. Wiesbaden

    Directory of Open Access Journals (Sweden)

    Ohlig, R.

    1962-09-01

    Full Text Available La fábrica de cemento Dyckerhoff, de Wiesbaden-Amoneburg, decidió la construcción de dos edificios industriales con objeto de dar cabida a las instalaciones necesarias para la fabricación de cemento Portland blanco como parte suplementaria a la fábrica ya existente. En uno de estos edificios se han instalado cinco molinos de cemento en dos naves, y aún queda espacio para la instalación de otros dos. Este edificio tiene en planta 50 x 28 m. El otro edificio, destinado al almacenamiento de clinker, es de 29 x 50 m en planta. El profesor E. Neufert, de la Asociación alemana de Arquitectos, que se encargó de la parte artística, llegó a la solución de cubrir ambos edificios con una lámina formando módulos cilíndricos y de hormigón armado. El cuerpo de los edificios es de arquitectura cúbica y soportes prismáticos.

  10. Edificio de oficinas en Haaga - Helsinki – Finlandia

    Directory of Open Access Journals (Sweden)

    Heikki Castrén y Cía., Arquitectos

    1974-05-01

    Full Text Available This building has been constructed to house the head office of the company. It occupies eleven floors above ground and three subterranean ones, in addition to the lift shafts and its machinery tower. Since the lowest level is situated lower than and very close to the sea level a retaining wall has been constructed that is separated from the building by an inspection corridor which in addition isolates it from the possible humidity. Total foundation on the rock; beams and double pillars that allow pipes to be placed inside; mobile layout of partitions, aluminum windows with isolating glass; various airconditioning installations; pneumatic communications, etc. In addition to the premises for which it is actually intended it includes a spacious auditorium, a staff dining room, and a gymnasium with swimmingpool.Este edificio ha sido construido para albergar la sede central de la compañía. Se distribuye en once plantas sobre la rasante y tres subterráneas, además del foso de ascensores y la torre de maquinaria de los mismos. Dado que el nivel inferior se encuentra más bajo que el del mar y muy próximo a éste, se ha creado un muro de contención separado del edificio por un corredor de inspección que, además, lo aísla de las humedades posibles. Cimentación total sobre roca; estructura de hormigón armado; vigas y pilares dobles, que permiten el paso de conductos por su interior; tabiquería móvil; ventanas de aluminio con cristal aislante; toda suerte de instalaciones de acondicionamiento, comunicaciones neumáticas, etc. Además de las dependencias propias del uso a que se destinan, comprende un amplio auditorio, comedor de empleados y gimnasio con piscina.

  11. La caída de los muros del conocimiento en la sociedad digital y las pedagogías emergentes

    OpenAIRE

    Gros Salvat, Begoña

    2015-01-01

    Este artículo sostiene que una de las consecuencias más importantes de la sociedad del conocimiento es la transformación de los espacios y lugares para el aprendizaje. Consideramos el aprendizaje 'sin costuras', la ubicuidad y los entornos personales de aprendizaje como pilares fundamentales de los nuevos espacios formativos. Las pedagogías que emergen deben posibilitar la eliminación de los muros del conocimiento dotando a las personas de la capacidad suficiente para enfrentarse a un aprendi...

  12. Arquitectura modernista en Palma de Mallorca : el edificio Forteza Rey

    Directory of Open Access Journals (Sweden)

    María José Galván Mostazo

    1989-01-01

    Full Text Available El edificio Forteza Rey es un fiel exponente de la arquitectura urbana burguesa de comienzos de siglo. Por su dinámica espacial y por su sintaxis decorativa puede englobarse bajo el denominado «modernismo». Tanto la riqueza iconográfica que presenta como su peculiar proceso de construcción, donde aparecen las figuras de artista aún sin estudiar (José Forteza Rey, su hijo Luis, José Alomar otorgan a este edificio un interés especial. Ubicada en el centro urbano de Palma de Mallorca, la Casa Rey está construida sobre un área aproximada de 130 m^ con un desarrollo a partir del nivel de calle de seis plantas más dos secciones subterráneas. Cada planta tiene una distribución espacial similar, acorde con las necesidades de sus ocupantes, aunque en todos los pisos coinciden la disposición de servicios (cocina, baños, despensas, cuarto de servicio, etcétera.

  13. Control inteligente de sistemas e iluminación en edificios

    OpenAIRE

    Huamán Rojas, Jezzy James

    2017-01-01

    La tesis desarrolla un controlador adaptativo para el control inteligente de la iluminación en cualquier ambiente, esto considera edificios, casas, oficinas, entre otros. Se presentan dos opciones de controlador y, para considerarlo un sistema inteligente, este se adapta al usuario haciendo uso de la tecnología de aprendizaje automático y regulable. Redes neuronales artificiales y árboles de decisión se emplean para adecuar la iluminación sin dejar de cumplir las normas que se establecen por ...

  14. El poder de la estructura: edificio BBK Paraninfo

    Directory of Open Access Journals (Sweden)

    Losada, R.

    2012-06-01

    Full Text Available The most recently work of Álvaro Siza, in Spain, shows us the merits of the structural system in the composition of its forms and spaces, its overhangs and the movement in the alignment of its façades; the creation of the architectonic space and its envelope. The BBK Auditorium consists of a structural system of layered walls, mixed structural slabs (steel, concrete and reinforced concrete slab foundations on augercast piles. The position and dimensions of the spaces with no intermediary supports and the characteristics of the overhangs create discontinuous transmission of actions, which require strong reinforcements in limited sections of the concrete, implying complexity in its execution and performance in response to concrete shrinkage. Architecturally, the structure goes entirely unnoticed in the architecture, characterized by its visual simplicity within an intricate spatial and constructive arrangement, where the nuances of natural light play a basic role in the definition of the spaces.

    La última obra terminada por Álvaro Siza en España permite reflexionar sobre el valor del sistema estructural en la composición de formas y huecos, de vuelos y los movimientos de alineación de fachadas; en suma, de la creación del espacio arquitectónico y su envolvente. El edificio BBK Paraninfo muestra un sistema estructural de láminas – muro, con forjados de estructura mixta (acero – hormigón, cimentación de losa de hormigón armado sobre pilotes barrenados. La posición y dimensiones de huecos sin apoyos intermedios y las características de los vuelos dan lugar a una discontinuidad de transmisión de acciones, que requieren fuertes armaduras en secciones limitadas de hormigón, comportando una complejidad de ejecución y actuación frente a retracciones del hormigón. Arquitectónicamente, la estructura pasa totalmente desapercibida en una arquitectura caracterizada por su simplicidad visual, complejidad

  15. Edificio de «La Caixa» Madrid – España

    Directory of Open Access Journals (Sweden)

    Bosch Aymerich, José M.

    1980-10-01

    Full Text Available This eight-storey building, for «La Caixa», occupies a city block on the downtown avenue of Paseo de la Castellana in Madrid. The lower floors have cants on their four corners, which fade away gradually giving the building a more original note. All of the floors are developed about a central core, and the lower floors are to be used for «La Caixa» needs. The foundations were carried out on the basis of reinforced concrete piles. Metal pillars were used for the structure, and the flooring system was on the basis of a continuous reinforced slab. The exterior of the building was executed in the form of an aluminium curtain wall, with finishing touches in a U shape which break up the glazed surface.

    Este edificio de ocho plantas, destinado a «La Caixa», ocupa una manzana en el céntrico Paseo de la Castellana de Madrid. Las plantas Inferiores presentan chaflanes en sus cuatro esquinas, los cuales van desapareciendo progresivamente ganando así el edificio en originalidad. Todas las plantas, de las cuales las inferiores están destinadas al servicio de «La Caixa», se desarrollan en torno a un núcleo central. La cimentación se realizó a base de pilotes de hormigón armado. Para la estructura se emplearan pilares metálicos y el sistema de forjado a base de una losa continua armada. Se adoptó para las fachadas la solución de un muro cortina de aluminio, con remates en forma de U que cortan la superficie acristalada.

  16. Edificio principal de la E.F.G.S. - Macolin – Suiza

    Directory of Open Access Journals (Sweden)

    Schlup, Max

    1974-07-01

    Full Text Available Thirty years after the foundation of the Federal School of Gymnastics and Sports and in view of the urgent need of enlarging its installations it has been necessary to construct a new block that contained: auditoriums, projection halls, offices, gymnasium, dressing rooms, swimmingpool, etc., reserving the premises of the original building for housing and recreation rooms. The new building with metallic structure and flat roofs is situated behind the old one,, and developed along the natural slope of the ground and has curtain walls that give it a transparent look. It consists of an almost transparent storey with entrance and terrace; two further storeys with a large auditorium and library and five basements with the remaining installations of the Centre.Al cabo de treinta años de fundarse la Escuela Federal de Gimnasio y Deportes y ante ¡a necesidad imperiosa de ampliar sus instalaciones, ha sido preciso construir un nuevo bloque que albergara: aulas, salas de proyección, oficinas, gimnasio, vestuarios, piscina, etcétera, reservando los locales del edificio primitivo para zona de estancia y habitaciones. El nuevo edificio con estructura metálica y cubiertas planas está situado detrás del antiguo, rodeado de bosques y desarrollado en profundidad, a favor de la pendiente natural del terreno, ofreciendo hacia el paisaje la transparencia de sus cerramientos a base de muros-cortina. Consta de una planta casi diáfana, con entrada y terraza; dos plantas altas con aula magna y biblioteca y cinco semisótanos con las demás instalaciones del Centro.

  17. Instalaciones eléctricas en edificios de viviendas. Proyecto de un edificio.

    OpenAIRE

    Sánchez Rodríguez, Juan Manuel; Cárcel Carrasco, Francisco Javier

    2015-01-01

    Sánchez Rodríguez, JM.; Cárcel Carrasco, FJ. (2015). Instalaciones eléctricas en edificios de viviendas. Proyecto de un edificio. Area de Innovación y Desarrollo S.L. http://hdl.handle.net/10251/83665 Senia

  18. Antimicrobial Activity of Fatty Acid Salts Against Microbial in Koji-Muro

    Directory of Open Access Journals (Sweden)

    Tanaka Aya

    2016-01-01

    Full Text Available Aspergillus niger and Aspergillus oryzae are used as koji fungi in the spot of the brewing. Since koji-muro (room for making koji was a low level of airtightness, microbial contamination has long been a concern to the alcoholic beverage production. Therefore, we focused on the fatty acid salt which is the main component of soap. Fatty acid salts have been reported to show some antibacterial and antifungal activity. This study aimed to find the effectiveness of the fatty acid salt in koji-muro. Nine fatty acid salts were tested. The result, C12K was antibacterial effect against B. subtilis. C10K and C12K was antifungal effect against R. oryzae. These results suggest C12K has potential in the field of koji-muro.

  19. Del fin de la guerra fria al comienzo de la guerra sin fin

    OpenAIRE

    Ferrier, Jean Pierre

    2006-01-01

    El Profesor Ferrier nos describe los acontecimientos de la sociedad internacional en los ultimos 15 años y señala la profunda diferencia entre "la estabilidad" durante la guerra fría y la "revolucion" que se ha producido en el escenario internacional a partir de la caida del muro de Berlin. Hace especial referencia al comportamiento de la superpotencia (Estados Unidos) y su guerra sin fin contra los "nuevos enemigos" en los diferentes teatros internacionales en su lucha por imponer el "Bien" ...

  20. Estudio de reutilización de un edificio sin uso. Plaza de toros de Ibi (Alicante)

    OpenAIRE

    Picó Gómez, Iván

    2015-01-01

    La reutilización de edificios con cambio de uso supone una práctica relativamente usual en la actualidad, cuyo recorrido en la historia ha pasado del mero aprovechamiento de espacios a ser una alternativa de construcción. Muchos son los ejemplos alrededor del planeta sobre esta práctica, la rehabilitación adaptada con cambio de uso, materializándose desde épocas antiguas y existiendo claros ejemplos, como: el Partenón de Atenas, Santa María del Naranco en Asturias o la Catedral de Notre Dame ...

  1. Tratamiento de los edificios contra la humedad del terreno

    Directory of Open Access Journals (Sweden)

    Gómez Rodríguez, P. J.

    1966-07-01

    Full Text Available This paper entions the main damage that may arise from excessive dampness in building materials. One of the main sources of this humidity is the rising of water through capillarity from the ground, and across foundations and walls. Soil water may be of two kinds (disperse and freatic, and criteria are given for recognising each type. As a matter of information, the paper finally mentions the methods that are utilised to counteract the above type of humidity. These methods are termed preventive, when they are applied during the construction of the building; and curative, if undertaken after the building has been completed.Se indican en el presente artículo los principales daños que puede producir el exceso de humedad en los materiales de construcción, estableciendo, como una de las causas fundamentales, la ascensión capilar del agua del suelo a través de cimientos y muros. El agua existente en el terreno puede ser de dos tipos (dispersa y freática y se dan criterios para su reconocimiento. A continuación se indican, a título informativo, los diferentes procedimientos que se utilizan para defenderse de este tipo de humedades, clasificándolos, por su aplicación, ya sea durante la construcción del edificio (soluciones preventivas o posteriormente a ella (soluciones curvativas.

  2. Edificio de viviendas en Madrid - España

    Directory of Open Access Journals (Sweden)

    González Cruz, J. Luis

    1978-09-01

    Full Text Available An apartment block was built using only little more than 50% of the available irregular-shaped 1,773 m2 plot area, consisting on 12 storeys above grade, one semibasement floor for offices and two underground levels for carpark and mechanical installations. The remaining area was landscaped for public use. The elongated rectangular configuration of the typical floor plan and the multiple vertical traffic cores have permitted and optimal space organization of the housing units, opening to two opposite directions, thus using the maximum advantages for natural lighting and ventilation, sun exposure and views. The structure of the building is based on reinforced concrete shear walls, with ceramic prefab, one-way reinforced flooring units in the apartment storeys and cross-ribbed reinforced concrete slabs in the basement areas. The decorative features of the concrete used have been applied at their best to create an aesthetic appearance, combined with the treatment of the external walls.

    Ocupando poco más del 50% de una parcela irregular de 1.733 m2 de superficie se ha levantado este edificio de viviendas de 12 plantas sobre rasante, un semisótano destinado a oficinas y dos sótanos que albergan los aparcamientos y las instalaciones generales de la construcción. El resto del solar se dedica a jardines y a zona de uso público. La configuración de la planta tipo según un rectángulo muy alargado y la multiplicidad de los núcleos de comunicación vertical, ha posibilitado una óptima organización de las viviendas con dos orientaciones opuestas que permiten sacar el máximo partido de la iluminación, ventilación, soleamiento y vistas exteriores. El edificio se ha realizado con estructura vertical de vigas-muro de hormigón armado, con forjados unidireccionales cerámicos en las plantas de vivienda, y de losa armada birreticular en los sótanos. En el aspecto estético se han aprovechado las ventajas

  3. Beneficios económicos de la certificación LEED. Edificio centro Ático: caso de estudio

    Directory of Open Access Journals (Sweden)

    Óscar Ribero

    Full Text Available En el presente artículo se estudian los beneficios económicos de la aplicación del programa de certificación de construcciones sostenibles LEED, en el Edificio Centro Ático situado en Bogotá - Colombia. Inicialmente, se determinan los consumos de agua y energía eléctrica, y los costos de construcción y operación del edificio bajo su diseño original (construido sin tener en cuenta los parámetros establecidos por LEED. Seguido a esto se plantean estrategias para lograr que el edificio Centro Ático alcance la certificación LEED GOLD New Construction V3 2009 y se calculan los incrementos económicos asociados a éstas. Así mismo, se calculan los nuevos consumos de agua y energía eléctrica bajo la aplicación de dichas estrategias (diseño modificado y sus correspondientes costos de operación. Finalmente, se determinan los indicadores de bondad económica de la inversión mediante un análisis de flujo de caja.

  4. A queda do muro de Berlim: um estudo com fontes brasileiras

    Directory of Open Access Journals (Sweden)

    Carlos Federico Domínguez Ávila

    2010-10-01

    Full Text Available O artigo explora os acontecimentos que resultaram na queda do muro de Berlim, bem como algumas das suas mais importantes conseqüências, inclusive no que diz respeito à reunificação alemã, em 1990. O texto utiliza prioritariamente fontes primárias resgatadas no Arquivo Histórico do Ministério das Relações Exteriores do Brasil - após vários anos de resguardo legal. Também são utilizadas fontes secundárias - isto é, literatura especializada na temática publicada no Brasil e no exterior. Analiticamente o artigo constata a transcendental relevância da queda do muro de Berlim e eventos subseqüentes, tanto na própria Alemanha, quanto na Europa e no mundo. Nessa linha, o texto alude ao colapso político e econômico da República Democrática da Alemanha (RDA, aos atores fundamentais que levaram ao esboroamento do muro, aos condicionantes domésticos, inter-alemães, europeus e globais que incidiram no processo de reunificação da nação alemã e aos dilemas específicos da cidade de Berlim no contexto geral da reunificação germânica. O trabalho inclui uma pós-data de novembro de 2009, em que se comenta brevemente as comemorações do vigésimo aniversário da queda do muro de Berlim.

  5. Il muro come galleria

    Directory of Open Access Journals (Sweden)

    Duccio Dogheria

    2008-06-01

    Full Text Available Il muro, nel suo grigio rigore formale, nella sua fredda geometria, nel suo intento divisorio, nasconde spesso il cielo. Sovente il linguaggio dell’arte, ma non di meno quello della comunicazione, hanno interferito con le sue algide barriere. In molti casi, beninteso, non è che il potere in altre forme, che interferisce con se stesso: pensiamo ai bandi affissi agli angoli delle città, o le lettere d’indulgenza papali -spesso impreziosite da miniature al punto da poterle considerare antenate dal manifesto- che nel corso del medioevo venivano affisse sulle porte delle chiese.

  6. Edificio Discount Bank - Ginebra – Suiza

    Directory of Open Access Journals (Sweden)

    Braillard, P.

    1973-09-01

    Full Text Available This building stands in the very centre of Geneva, and is made up of: — two basements, where the different types of mechanical and electrical installations are to be found; — a ground floor, with a hall for the public, ticket office and cash safes; — six floors of offices, with management and lecture rooms; — an attic, with terrace, which is where the staff dining room and cafeteria is located. Construction made of reinforced concrete slabs, resting on walls also made of concrete or on steel and concrete pillars. The frontage, from the pavement to the metal and glass awning which surrounds the building, has a granite coating. The upper part is made of large monolithic squares of artificial stone with double glass panels. The attic is completely glazed. Marble, stone, linoleum and carpeted floors, according to the use and function of the premises. The building is fully equipped with: two lifts, two document lifts, pneumatic mail, alarm system, automatic fire-extinction installation and air conditioning and ventilation installations, telephone, electric and lighting systems.En el mismo centro de Ginebra se levanta este edificio, que consta de: — dos sótanos, en los que se distribuyen los diferentes tipos de instalaciones mecánicas y eléctricas; — una planta baja, con el hall de público, taquillas y cajas de caudales; — seis plantas de oficinas, con dirección y salas de conferencias; — un ático, con terraza, en el que se encuentran el comedor y la cafetería para el personal. Construcción a base de losas de hormigón armado, apoyadas sobre muros también de hormigón o en pilares de acero y hormigón. La fachada, desde la acera hasta la marquesina de metal y vidrio que rodea el edificio, lleva revestimiento de granito. La zona superior es de grandes cuadros monolíticos de piedra artificial con entrepaños de vidrio doble. El ático está completamente acristalado. Suelos de mármol, gres, linóleo y moqueta, según el uso y

  7. Consolidación estructural del edificio patrimonial de C/Ripoll, 25 de Barcelona - Ca la Dona

    Directory of Open Access Journals (Sweden)

    Bestraten, S.

    2012-12-01

    Full Text Available The building, found in 25th Ripoll Street, in Barcelona, is listed by the Special Plan for protection of architectural heritage of the Barcelona district, Ciutat Vella. In 2005, the Ca la Dona association with support from all Catalan public administrations, starts a restoration process under a sustainability criteria. An innovative structural intervention is performed consisting in a functional replacement of the existing floorings with cross-laminated timber panel, which, doesn’t change the overall load state of the building, making compatible the structural continuity of the existing load-bearing walls. This project opens a way to the prefabrication of solutions used in architectural restoration, allowing to adapt to regulatory constraints, along with considering current issues, such as, sustainability.

    El edificio de la calle Ripoll nº25 de Barcelona está catalogado por el Plan especial de protección del patrimonio arquitectónico del distrito barcelonés de Ciutat Vella. En 2005 la asociación Ca la Dona con el apoyo de todas las administraciones públicas catalanas inicia un proceso de rehabilitación con criterios de sostenibilidad. Se realiza una intervención estructural innovadora consistente en una sustitución funcional de forjados existentes con panel de madera contralaminada, que en general no modifica el estado de cargas del edificio haciendo compatible la continuidad estructural de los muros de carga existentes. Este proyecto abre un camino a la prefabricación en la rehabilitación arquitectónica, que permite su adaptación a los requerimientos normativos actuales y a su vez integra consideraciones tan actuales como la sostenibilidad.

  8. Towards a sustainable architecture: Adequate to the environment and of maximum energy efficiency; Hacia una arquitectura sustentable: adecuada al ambiente y de maxima eficiencia energetica

    Energy Technology Data Exchange (ETDEWEB)

    Morillon Galvez, David [Comision Nacional para el Ahorro de Energia, Mexico, D. F. (Mexico)

    1999-07-01

    An analysis of the elements and factors that the architecture of buildings must have to be sustainable, such as: a design adequate to the environment, saving and efficient use of alternate energies, and the auto-supply is presented. In addition a methodology for the natural air conditioning (bioclimatic architecture) of buildings, as well as ideas for the saving and efficient use of energy, with the objective of contributing to the adequate use of components of the building (walls, ceilings, floors etc.), is presented, that when interacting with the environment it takes advantage of it, without deterioration of the same, obtaining energy efficient designs. [Spanish] Se presenta un analisis de los elementos y factores que debe tener la arquitectura de edificios para ser sustentable, como; un diseno adecuado al ambiente, ahorro y uso eficiente de la energia, el uso de energias alternas y el autoabastecimiento. Ademas se propone una metodologia para la climatizacion natural (arquitectura bioclimatica) de edificios, asi como ideas para el ahorro y uso eficiente de energia, con el objetivo de aportar al uso adecuado de componentes del edificio (muros, techos, pisos etc.) que al interactuar con el ambiente tome ventaja de el, sin deterioro del mismo, logrando disenos energeticamente eficientes.

  9. Methodology for bioclimatic design; Metodologia para el diseno bioclimatico

    Energy Technology Data Exchange (ETDEWEB)

    Morillon Galvez, David [Instituto de Ingenieria de la UNAM, Mexico, D.F. (Mexico)

    2000-07-01

    A methodology for natural air conditioning of buildings is presented; bioclimatic architecture, in order to contribute to the suitable use of components of the building (walls, ceilings, floors, orientations, etc.) that when interacting with the environment takes advantage of it, without deterioration of the same, obtaining energy efficient designs. As well as an analysis of the elements and factors that the architecture must have to be sustainable; an adequate design to the environment, saving and efficient use of energy, the use of alternating energies by means of ecotechnologies and the self-sufficiency. [Spanish] Se presenta una metodologia para la climatizacion natural de edificios; arquitectura bioclimatica, con el objetivo de aportar al uso adecuado de componentes del edificio (muros, techos, pisos, orientaciones, etc.) que al interactuar con el ambiente tome ventaja de el, sin deterioro del mismo, logrando disenos energeticamente eficientes. Asi como un analisis de los elementos y factores que debe tener la arquitectura para ser sustentable; un diseno adecuado al ambiente, ahorro y uso eficiente de la energia, el uso de energias alternas mediante ecotecnologias y la autosuficiencia.

  10. Edificio para Cristalería Española

    Directory of Open Access Journals (Sweden)

    de la Joya, R.

    1964-03-01

    full and careful study of cost when preparing a project involving curtain walls, in order to evaluate correctly their advantages.Dio a conocer—dentro del ciclo de conferencias sobre muros-cortina, celebrado en la Escuela Técnica Superior de Arquitectura, de Madrid—sus experiencias personales en la construcción de un edificio, proyectado por él y por Manuel Barbero, para Cristalería Española, en San Andrés del Palomar, de Barcelona. Enumeró las ventajas que exponen los técnicos de otros países sobre el muro-cortina: menor peso de los materiales que componen la fachada; máximo aprovechamiento de la superficie habitable; abaratamiento de la cimentación; mejor control del tiempo; calidad y precisión; y facilidad de conservación. A continuación, y en el mismo orden, explicó por qué y en qué puntos no estaba de acuerdo con dichas ventajas: 1.° Partiendo de la construcción actual, con elementos de hormigón y forjados de tipo aligerado, no es fácil obtener una gran economía debido a la serie de elementos que hay que emplear para colocar y mantener en su sitio el muro-cortina. 2.° Que aunque teóricamente el muro-cortina puede tener 4 ó 5 m de espesor, la realidad es que si no es a costa de un enorme aumento de la calefacción, o del acondicionamiento, precisan, además, un revestimiento interior. 3.° Es muy difícil que los cimientos puedan abaratarse por el empleo de este tipo de fachada, ya que dicho abaratamiento es más teórico que real. 4.° Que aparte de que el factor tiempo suele fallar, la calidad en la ejecución no está todavía muy lograda. 5.° Se necesita un entretenimiento periódico para que la vejez no se acentúe, al igual que en las fachadas de tipo tradicional. Se extendió en una serie de consideraciones, además de las puramente técnicas, que no aconsejan el empleo del muro-cortina en España (economía en la mano de obra de albañilería, factor clima, carestía de las instalaciones de acondicionamiento, etc.. A continuaci

  11. Aguas contemporáneas

    Directory of Open Access Journals (Sweden)

    Underlea Bruscato Portella

    2007-10-01

    Full Text Available El agua parece un material esquivo para la arquitectura. Propio del mundo natural, fluido y cambiante, distante de la estabilidad perenne de los edificios, que la eluden con sus gruesos muros y amplias techumbres. Sin embargo, algunas construcciones han logrado una emotiva amalgama con el devenir del agua, como los jardines de la Alhambra en Granada. Quizás por provenir de una cultura que apreciaba la escasez del recurso líquido y su frescor en la vida diaria. Estanques, fuentes, canales, regaderas, se combinan con el aroma de los naranjos, el delicado aderezado de las columnas y arcos, la sombra de los salones, la vista enmarcada de las sierras, el lujo de la corte, el placer de los sentidos.

  12. Edificio Creole

    Directory of Open Access Journals (Sweden)

    Lathrop Duglass

    2017-06-01

    Full Text Available En la Caracas actual, una de las ciudades más modernas del mundo, donde se levantan soberbios edificios de avanzadas líneas, se ha construido éste, siguiendo las directrices simplistas y de funcionalismo, características y propias de nuestra época.

  13. Edificio Mixto, Ginebra

    Directory of Open Access Journals (Sweden)

    Bussat, P.

    1961-04-01

    Full Text Available Se trata de un edificio doble, cuyos pisos superiores están reservados para viviendas particulares, el entresuelo para locales administrativos y la planta baja para almacenes y otros locales comerciales.

  14. "Sobre muros e jardins": poesia e videodança

    Directory of Open Access Journals (Sweden)

    Olga Valeska

    2014-07-01

    Full Text Available http://dx.doi.org/10.5007/1807-9288.2014v10n1p187 Neste trabalho propomos uma análise semiótica da videodança “Sobre Muros e Jardins”, promovido pelos Grupos de Pesquisa parceiros COMTE do Posling-CEFET-MG e CCODA da UFMG. Este vídeo foi produzido a partir do poema homônimo de Olga Valeska "Sobre Muros e Jardins", presente no seu livro Mundos e Mutações. Como tradução semiótica ele envolve distintas linguagens como a literária, a fílmica e a dança. Nosso objetivo é verificar como tais linguagens foram transpostas para o gênero “vídeodança”, em um processo dinâmico de mutação entre distintas texturas de imagens, sons e movimentos rítmicos.

  15. Edificios Públicos

    Directory of Open Access Journals (Sweden)

    Gonzalo Cerda Brintrup

    1988-06-01

    Full Text Available El edificio de la gobernación ocupaba la calle O'Higgins esquina Gamboa. Construido de madera, de dos pisos y de una arquitectura coherente con el entorno, comprendía la casa del gobernador, las oficinas públicas y el Correo. Se incendió en 1971 cuando era gobernador don Celedonio Cárdenas.

  16. Los edificios deportivos de la Roma Antigua

    Directory of Open Access Journals (Sweden)

    Angela TEJA

    2013-11-01

    Full Text Available La educación física y el deporte retrocedió —en la Roma antigua— respecto a los ideales físico-corporales griegos. Por contra, se fomentó una notable cultura de espectáculos y divertimentos, especialmente durante la época imperial. A fin de dar cobijo a los diversos espectáculos se construyeron en la ciudad de Roma —y por mimetismo en todas las urbes del Imperio— sofisticados edificios. En efecto, además de una importante red de circos —el más emblemático de los cuales fue el circo Máximo—, se levantaron anfiteatros y termas, amén del estadio de Dominiciano. La autora pasa revista a las distintas instalaciones «deportivas» de la Roma antigua, así como a los espectáculos que albergaban: las carreras del circo, los combates de gladiadores, las cacerías de fieras, las naumaquias, sin olvidar las competiciones del estadio y la pasión romana por las termas.

  17. Claudio Coello decorador mural: a propósito de un proyecto suyo para la decoración de un muro de capilla

    Directory of Open Access Journals (Sweden)

    Piedra Adarves, Álvaro

    2002-12-01

    Full Text Available Aspecto todavía poco conocido de la producción artística de Claudio Coello (1642-1693 es, sin duda, su labor como decorador mural. Aunque no es mucho lo que se conserva de sus pinturas murales -, las fuentes que poseemos de ellas y la existencia de algunos dibujos suyos para la decoración de paramentos y techos, indican que su actividad en este género fue tan relevante como la de caballete. El proyecto que estudiamos a continuación, la Decoración de un muro de capilla mayor dedicado a la Inmaculada Concepción de María, se suma pues a este intento de conocer mejor la obra de Coello como decorador mural....

  18. Edificio Atalaya Barcelona

    Directory of Open Access Journals (Sweden)

    Correa, Federico

    1975-02-01

    Full Text Available This unique building, situated at the crossing Diagonal-Carretera of Sarría of Barcelona, consists of four basements, two levels for premises and offices that occupy the entire site and of twenty two of apartments that assume the shape of a cross so as to obtain the maximum independence of view between the different wings, in addition to other aesthetic and volumetric considerations. The structure is of reinforced concrete with flat floors without beams and the curtain walls of prefabricated pieces and artificial stone. An attempt has been made, and we consider the aim to have been achieved to construct a well planned and well balanced tall building, viewed from close by as well as from a distance.Este edificio singular, situado en el cruce Diagonal-Carretera de Sarria, de Barcelona, consta de cuatro plantas de sótanos, dos de locales y oficinas que ocupan todo el solar y veintidós de apartamentos, que adoptan la forma de cruz gamada con el fin de conseguir la máxima independencia de vistas de unos con respecto a otros, aparte de otras consideraciones estéticas y volumétricas. La estructura es de hormigón armado con forjados planos, sin vigas, y los cerramientos, modulares, de piezas prefabricadas de piedra artificial. Se ha pretendido, y consideramos logrado, el doble efecto de un rascacielos humano que se aprecia ponderado y equilibrado, tanto si se mira desde lejos como si se contempla desde cerca.

  19. Instalación en un edificio de oficinas

    OpenAIRE

    Oromí Seijo, Arturo

    2017-01-01

    El presente proyecto teórico trata de trabajar sobre la elaboración de unos diseños de un edificio de oficinas de 5 plantas situado en Barcelona en las que tendrá 85 trabajadores y en las que se dotará al edificio de una instalación solar térmica para producir agua caliente sanitaria (A.C.S) y se diseñara y dimensionara para poder cubrir la demanda necesaria en medida de lo posible. La primera parte del proyecto será situar el edificio de oficinas y diseñar la distribución de cada planta p...

  20. Las comunicaciones móviles en los edificios inteligentes

    OpenAIRE

    Reyes Muñoz, María Angélica

    2011-01-01

    Este trabajo presenta una plataforma de red móvil aplicada a los entornos de edificios inteligentes. En primer lugar, los edificios inteligentes han sido definidos como “aquellos que utilizan la tecnología computacional para gestionar de manera autónoma todos los servicios que ofrece un entorno de un edificio tales como optimizar el confort del usuario, el consumo de energía y la seguridad” [Callaghan 00].Desde el punto de vista de las telecomunicaciones específicamente desde e...

  1. Alternativa estructural de refuerzo horizontal en muros de mampostería Structural alternative of horizontal reinforcement in masonry walls

    Directory of Open Access Journals (Sweden)

    Diego Fernando Páez Moreno

    2009-01-01

    Full Text Available La implementación de refuerzo horizontal en muros de mampostería con ladrillo macizo de arcilla cocida es una técnica empleada en varios países. En este trabajo se propone un análisis para muros de mampostería representativos de la ciudad de Tunja con la implementación de grafiles de acero como alternativa de refuerzo horizontal. Este estudio involucra la definición de los tipos de materiales a emplear, las características de los muros a ensayar y las variables que se deben aplicar, tanto en los muros como en la ejecución del ensayo de compresión diagonal, que define tipos de muros con características propias de refuerzo. Los resultados del proceso de análisis del comportamiento individual y general de los muros de mampostería sometidos al ensayo de compresión diagonal permiten identificar la variación del esfuerzo cortante representativo para cada tipo de muro, en relación con el refuerzo empleado en los diferentes modelos y la tipología de falla.Implementation of horizontal reinforcement in masonry walls with solid cooked clay bricks is a commonly used technique in several countries. This article is intended to analyze masonry walls representatives of Tunja City, with implementation of small steel bars as an alternative of horizontal reinforcement. This study involves definition of types of materials to be used, characteristics of walls to be tested, and variables which should be applied in both walls and during the execution of the diagonal compression test which defines the types of walls with own characteristics of reinforcement. Results from individual and general behavior analysis process of masonry walls subject to diagonal compression tests allow identifying variation of shear stress for each kind of wall, in relation to reinforcement used in several models and failure typology.

  2. Edificio Pirelli – Barcelona

    Directory of Open Access Journals (Sweden)

    Bona, Eusebio

    1959-01-01

    Full Text Available El edificio tiene un frente principal de 39,53 m y una profundidad de 25 m, o sea, una superficie de 966 m2 la cual, levantada hasta la altura permitida, da un desarrollo total de superficies construidas de 12.341,89 m2 incluida la edificada en el patio interior de manzana, y un volumen de 39.765 m2 aproximadamente. El edificio consta de dos plantas de sótanos, a un nivel de 8,55 m por debajo de la rasante de la calle; planta baja; siete plantas de igual superficie, y la octava y novena plantas retranqueadas. Sobre la planta de cubierta, construida en techo plano, se manifiestan tres volúmenes unidos entre sí, que contienen un depósito de agua y las máquinas de los elevadores.

  3. Protecciones solares y su implicancia en la demanda energética: caso edificio público en Concepción, Chile

    Directory of Open Access Journals (Sweden)

    Jazmín Jara Córdova

    2013-06-01

    Full Text Available Determinar las ganancias solares en el vano-ventana con protecciones solares y analizar el comportamiento térmico en un edificio es un tema relativamente nuevo en el ámbito chileno. No obstante, el inadecuado manejo del control solar, en algunos casos, genera problemas de sobrecalentamiento al interior de la edificación. Esta investigación busca establecer un procedimiento que permita evaluar cuatro tipos de protecciones solares y analizar sus implicancias energéticas en un edificio público, cuya infraestructura utilizada se justifica en el desconocimiento de nuevas exigencias que hará el Estado para este tipo de edificación. Para el caso de estudio se han determinado 37 escenarios con distintos factores solares modificados, definidos a través de cálculo manual, los cuales son evaluados bajo simulación dinámica (TAS. En primera instancia se analiza el comportamiento de dos recintos y posteriormente se obtienen los resultados en relación con la demanda energética del edificio. Las protecciones solares utilizadas (voladizos, retranqueo, lamas horizontales y verticales reducen la demanda de refrigeración de un 52 a 73% (aumentando la demanda de calefacción, sin embargo la demanda energética total (calefacción y refrigeración disminuye de un 24 a 31%.

  4. Monitoreo de funcionamiento y estrategias de eficiencia energética para el edificio público de Obras Sanitarias Sociedad del Estado, San Juan, Argentina

    Directory of Open Access Journals (Sweden)

    Yesica Alamino Naranjo

    2015-06-01

    Full Text Available El incremento de la potencia instalada en los sectores de consumo, por encima de la capacidad de generación, en los últimos diez años, sitúa a Argentina como país dependiente energéticamente. Una de las medidas de mitigación de las consecuencias ambientales, sociales y económicas asociadas, consiste en reducir el consumo de energía en los edificios. La sociedad pasa más del 30% de su tiempo en espacios de trabajo, en ambientes climatizados. Es objetivo del trabajo es encontrar estrategias de mejora sobre la eficiencia energética del edificio sin disminuir la calidad de vida de los usuarios. Para ello, se lleva a cabo un estudio de campo en el edificio sede de Obras Sanitaria Sociedad del Estado (OSSE, ubicado en la ciudad de San Juan (Argentina, mediante una aproximación experimental, contemplando aspectos funcionales, tecnológicos y referentes al equipamiento del edificio. Los resultados muestran valores de demanda de energía elevados en sistemas de climatización y artefactos de consumo eléctrico en oficinas. La implementación de estrategias de intervención de mínima inversión permitiría reducir el consumo energético en un 42% y recuperar más del 70% de la inversión durante el primer año de funcionamiento.

  5. Edificio para oficinas en la Universidad de California

    Directory of Open Access Journals (Sweden)

    Lin, T. Y.

    1964-09-01

    Full Text Available California University has just completed two buildings at Davis, one of nine storeys, and another smaller one, devoted to offices. Building involved the use of prefabricated, prestressed, load bearing units. The production and placing of these units required a very strict program of control and planning, as each of these operations had very specific features that were not straightforward. The walls, roof and floorings were made of load bearing panels. The lift and stair box was also an important structural element. Both this box and the cross bracing will take up loads arising from possible earthquake effects. As the building is situated on ground with poor resistance, the foundation consists of a number of inverted arches, which float on the soil, and distribute the loads uniformly over a wider area. The lifting of the various units was carried out with two moveable cranes fitted with very long lifting arms, both of which were operated in a closely integrated manner. The final success has been outstanding, both owing to the low cost, the saving in time, and also because it will be easy to extend the project at a later date, by merely moving the position of the lift box, and using the same type of building units.La Universidad de California acaba de construir dos edificios en Davis, uno de nueve plantas, destinado a clases, y otro de menor importancia para oficinas. La construcción debía realizarse con elementos prefabricados, pretensados y autorresistentes. La colocación y preparación de estos elementos se sometió a un estrecho y riguroso programa que se denominó crítico, pues cada una de sus fases presentaba particulares características que la diferenciaba de la siguiente. Los elementos constructivos principales—muros, cubierta y forjados—, debían componerse de paneles autorresistentes. Las cajas de escaleras y ascensores son, asimismo, resistentes; dichas cajas, junto con el arriostramiento general, absorben la mayor parte de las

  6. Estudo paramétrico para um muro de gravidade submetido a carregamentos sísmicos.

    OpenAIRE

    Tatiana Galvão Kurz

    2014-01-01

    A presente dissertação apresenta um estudo do comportamento de um muro de gravidade flexível submetido a carregamentos sísmicos. A influência do carregamento sísmico, e mais precisamente da variação da aceleração horizontal de pico é avaliada num estudo paramétrico, através da análise dos resultados obtidos para os deslocamentos e acelerações horizontais que ocorreram no paramento do muro de gravidade. Optou-se pela análise ao longo do tempo, introduzindo o carregamento sísmico ao modelo numé...

  7. A vila de Muros. Apuntes históricos

    Directory of Open Access Journals (Sweden)

    Vázquez Vilanova, José Antonio

    2010-12-01

    Full Text Available From the current situation it is difficult to be made a precise idea of the importance that ended up having the village of Muros in other times. On the other hand, we are before a peculiar case. While many small villages of the coast ended up with the step of the time to become important cities, here it happened just the opposite. For that reason it is important to stand out the true economic and demographic power that had in the past, but also to find the keys that marked treir road and that they gave the present moment as a result. The present study seeks to contribute to this purpose.

    [gl] Dende a situación actual resulta difícil facerse unha idea precisa da importancia que chegou a acadar a vila de Muros noutros tempos. Por outra banda, estamos ante un caso peculiar. Mentres moitas aldeas e pequenas vilas costeiras chegaron co tempo a convertirse en importantes cidades, semella que aquí sucedeu todo o contrario. Por iso é importante resaltar o verdadeiro poderío económico e demográfico que tivo no pasado, pero tamén atopar as claves que marcaron a súa traxectoria e que deron como resultado o momento presente. A tal propósito quixera contribuir o presente estudo.

  8. Análisis del comportamiento a flexión de muros de adobe reforzados con geomallas

    OpenAIRE

    Solís, M.; Torrealva, D.; Santillán, P.; Montoya, G.

    2015-01-01

    La tierra cruda constituye el material de construcción más importante en muchas regiones del planeta. Dado el riesgo sísmico existente en la mayor parte de estas regiones, es necesario el desarrollo de técnicas de refuerzo eficaces y adecuadas desde un punto de vista tecnológico y socioeconómico. Este artículo analiza desde un punto experimental y analítico el comportamiento a flexión de muros de adobe reforzados con geomallas. Las leyes momento-curvatura de los muros ensayados son aproximada...

  9. Recuperación de la verticalidad de un edificio

    Directory of Open Access Journals (Sweden)

    Iturraspe, Andrés

    1975-09-01

    Full Text Available This article describes the highly specialized operations undertaken in order to restore the verticality of a 4-storey building, devoted to flats, whose foundations had suffered a severe settlement; after having previously stopped the settlement process. The pillars were lifted with jacks. The paper also describes the operations applied to the walls the jacking and recuperating means, the control of the damaged structure, withdrawel of supports, etc.Se describen en el artículo las operaciones de alta especialización realizadas para devolver la verticalidad a un edificio de 4 plantas, destinado a viviendas, que había sufrido un fuerte asiento de cimientos, después de detener el proceso de dichos asientos. Se han elevado con gatos los pilares que habían descendido más, explicándose, asimismo, el procedimiento seguido en las fachadas sin pilares, geometría de recuperación, elementos de elevación, sujeción de la estructura rota, retirado de apoyos, etc.

  10. Edificio Ford

    Directory of Open Access Journals (Sweden)

    Skidmore, Owings y Merrill, Arquitectos Ingenieros

    1962-07-01

    Full Text Available El nuevo y moderno Centro Administrativo de la Ford ocupa una de las dos torres prismáticas de la Ciudad del Automóvil, entre las cuales, un edificio bajo y espacioso que se destina a garaje, cumple el papel de plaza y jardín. Los tres bloques fundamentales están servidos por una compleja y perfecta red de tráfico rodado de acceso a los diversos servicios a distintos niveles, resuelta con maestría encomiable y funcionalismo excepcional.

  11. Vaciado de edificios conservando la fachada

    Directory of Open Access Journals (Sweden)

    González Rodríguez, Santiago

    1984-09-01

    ática. Tras un breve comentario sobre la legislación vigente, se entra en materia sobre las ayudas a la rehabilitación en la búsqueda de soluciones que puedan dotar de eficacia a los actos administrativos orientados hacia la finalidad de conservar el patrimonio artístico y cultural. Se analizan las normas urbanísticas de protección y la Ordenanza Reguladora Municipal de Ayudas a la Rehabilitación, donde se vislumbra una voluntad del Ayuntamiento de Madrid y una toma de conciencia del problema, arbitrando, aunque todavía tímidamente, unas subvenciones y ayudas financieras para la conservación del patrimonio urbano. Es importante destacar la distinción que se hace entre la conservación normal u «ordinaria» del edificio y la conservación singular o «extraordinaria», por cuanto afecta a las obligaciones de la propiedad en tanto no se rebase el límite del deber de conservación que le corresponde, así como a la Administración en cuanto a la obligación que le incumbe de prestar la ayuda necesaria. En cuanto a la parte técnica, sin pretender ser riguroso, se expone un método práctico y sencillo para el mantenimiento provisional de las fachadas en tanto se procede a la sustitución del interior del edificio. Aparte de unas recomendaciones sobre las precauciones que deben tomarse y de la descripción del sistema de apuntalamiento, se dan los criterios de cálculo de la estructura tubular metálica, la normativa que es de aplicación y los costes aproximados por metro cuadrado.

  12. Edificio para viviendas «Point Royal», en Bracknell, Berkshire, Inglaterra

    Directory of Open Access Journals (Sweden)

    Arup Associates, Arquitectos

    1966-05-01

    Full Text Available A tall building, containing 102 flats, has been built near Bracknell, in Britain. These flats are intended for single people and childless couples. Significant features of this building are: the planform, the garage situated on the ground floor, and the approaches to the building. The siting of the building is most charming, and this is enhanced by the impressive external quality of the untreated concrete surfaces.Ha sido construido en los alrededores de la ciudad de Bracknell, Inglaterra, un bloque—tipo torre—con un total de 102 viviendas, destinadas para solteros y matrimonios sin hijos. Es de señalar en el mismo: la forma de su planta, las soluciones dadas al garaje existente en su nivel inferior y a los accesos al edificio, así como la belleza de su emplazamiento y la plástica de tratamiento, a base de hormigón armado visto, de sus alzados.

  13. Seismic pressure effect on retaining walls; Presiones generadas por sismo en muros de retencion

    Energy Technology Data Exchange (ETDEWEB)

    Bonola, Isaac; Aviles, Javier [Instituto Mexicano de Tecnologia del Agua, Jiutepec, Morelos (Mexico)

    2006-04-15

    Retaining walls are auxiliary works used in different hydraulic structures. In seismically active areas, the dynamic pressures generated by the backfill must be appropriately evaluated at the design stage. Currently, a number of methods for estimating the seismic response of this type of works are available; however, most of them are simplified and not all the parameters involved have been examined. In this paper, a hybrid boundary and finite element method is presented for gravity walls in which the backfill can be represented by a horizontally layered medium. The effect of lateral extension of the backfill can be included in the model by introducing a vertical boundary coupling the movement of the backfill with that of the surrounding soil. The wave propagation analysis in the layered medium is carried out for both horizontal and vertical harmonic excitation; the latter excitation may cause important responses under certain situations. To illustrate the applicability of the proposed method, results for two numerical examples are presented: one for dry backfill and other for saturated backfill, considering in both cases the variations of dynamic properties of the soil with the depth. [Spanish] Los muros de retencion son estructuras auxiliares utilizadas en distintas obras hidraulicas. En zonas sismicas, las presiones dinamicas generadas por el relleno deben evaluarse adecuadamente en la etapa de diseno. Actualmente existen numerosos metodos para estimar la respuesta sismica de este tipo de estructuras; sin embargo, la mayoria de ellos son simplificados y no todos los parametros involucrados han sido examinados. En este trabajo se presenta un metodo hibrido de frontera y elemento finito para muros de gravedad en el que el relleno puede representarse por un medio estratificado horizontalmente. En el modelo puede incluirse el efecto de la extension lateral del relleno, introduciendo una frontera vertical que acopla el movimiento del relleno con el del suelo

  14. El "cerco-muro" que está construyendo Israel

    OpenAIRE

    Frediani, Valeria

    2004-01-01

    Israel está construyendo un "cerco-muro" en la Ribera Occidental o "Cisjordania", con una extensión de 728 kilómetros, que aislará a 81 pueblos palestinos con 163.000 habitantes y a otros 210.000 que viven en el este de Jerusalén. Se extiende de norte a sur, violando la llamada "línea verde" que separaba Cisjordania del territorio israelí desde 1967. El gobierno de Ariel Sharon dice que el "cerco de seguridad" tiene por finalidad impedir el ingreso de suicidas palestinos. Los palestinos sosti...

  15. Costo energético de muros y techos utilizados en la zona sur de Tamaulipas

    Directory of Open Access Journals (Sweden)

    Mireya Alicia Rosas Lusett

    2015-01-01

    Full Text Available El presente trabajo muestra los procedimientos y resultados obtenidos del análisis de la energía trasmitida en techos y muros de las viviendas seleccionadas de la zona sur del estado de Tamaulipas, una de las cinco áreas establecidas dentro del proyecto “Desarrollo y validación de una metodología para estimar los impactos en el ahorro de energía por el uso de sistemas pasivo-constructivos en la edificación para diferentes climas de México”. Este proyecto fue financiado por la Convocatoria S0019-2009-01 del Fondo Sectorial de Sustentabilidad Energética SENER-CONACYT con registro Nº 118665, cuyo objetivo en su tercera etapa de ejecución, consistió en hacer uso de la herramienta Ener-Habitat, la cual fue desarrollada durante la segunda fase del proyecto. Con dicho programa de cálculo se determinaron los gastos de energía, comparativa de cuatro sistemas constructivos para muros y tres sistemas constructivos para losas utilizadas en la zona sur de Tamaulipas. Con la información obtenida y mediante el uso de la metodología desarrollada para estimar los impactos en el ahorro de energía, se evaluó el costo energético de cada uno de los sistemas constructivos. Con los resultados obtenidos se pudo determinar cuál era el muro y techo de menor gasto de energía para la zona de estudio. Adicionalmente se realizó un estudio de la influencia de la absortancia solar de la superficie exterior de los muros, cuyos resultados darán la pauta para diseñar una vivienda que pretende sea adecuada y cómoda al clima cálido húmedo que prevalece en el área.

  16. Edificio de viviendas. Ginebra

    Directory of Open Access Journals (Sweden)

    Gaillard, André

    1959-01-01

    Full Text Available En las afueras de Ginebra, cerca de la estación central de Cornavin, se ha levantado este inmueble de viviendas. El edificio, con tres fachadas, consta de seis plantas y un ático, aparte de la planta baja y dos sótanos, teniendo un total de 31 apartamentos y un estudio.

  17. Eficiencia isoterma de los modelos de ventilación exterior en patios de edificios residenciales. Estudio de casos

    Directory of Open Access Journals (Sweden)

    Padilla-Marcos, M. A.

    2015-12-01

    Full Text Available Many buildings have been designed and built with courtyards to supply the light and healthy air demands to the dwellings. However, confined air quality in many of them is unhealthy for human use due to the diminished ability to renew the air. The purpose of the study is to catalog different models of isolated building courtyards under isothermal conditions, according to their dimensions. The goal is to quantify the efficiency of air exchange in each model and analyze the influence of size in controlled external conditions. In addition, current regulations in Spain are compared with the obtained results. In conclusion, the efficiency of ventilation ratio for courtyards in buildings depends on its design.Muchos edificios han sido diseñados y construidos con patios interiores para satisfacer exigencias de habitabilidad, ya que estos espacios surten de luz y aire a los locales interiores. Sin embargo, la calidad del aire confinado en muchos de ellos es insalubre para el uso humano debido a la mermada capacidad que tienen para renovar su aire. El propósito del estudio es catalogar diferentes modelos de patio interior en edificios aislados, en condiciones isotermas, según sus dimensiones. El objetivo consiste en cuantificar la eficiencia en la renovación del aire en cada modelo y analizar la influencia de sus dimensiones en unas condiciones externas controladas. Adicionalmente, se comparan las normativas vigentes en España con los resultados así obtenidos. Como conclusión se determina la razón de cómo dicha eficiencia de la ventilación de patios interiores de los edificios desciende en función de su diseño.

  18. Las envolventes constructivas en la construcción no convencional de edificios del nordeste argentino y el problema de los puentes térmicos.

    Directory of Open Access Journals (Sweden)

    Manuel Venhaus Held

    2017-06-01

    Full Text Available Este trabajo analizó el comportamiento térmico de las envolventes de edificios en el Nordeste Argentino (NEA, cuyos sistemas constructivos emplean materiales prefabricados elaborados en serie y mano de obra especializada, atendiendo particularmente al impacto de los puentes térmicos. El objetivo fue diagnosticar y desarrollar criterios de optimización del desempeño energético de estas envolventes. Se estudiaron, para ello, los tipos y subtipos de construcciones no convencionales y se seleccionaron muestras de aquellos más empleados en el NEA. Éstas fueron evaluadas con los procedimientos de cálculo establecidos por las normas IRAM, de la serie 11.600, así como también mediante simulaciones realizadas con el software THERM. Los valores que pudieron obtenerse con ambos procedimientos presentaron discrepancias promedio del 2,6%. Con el software es posible obtener un coeficiente ponderado de transmitancia que incorpora muro opaco y puente térmico y, con la graficación del flujo de calor a través del cerramiento, reconocer fácilmente los puntos más críticos, para concentrar las acciones de optimización en ellos.  Documeto ejecutado bajo en proyecto "Rehabilitación higrotérmico-energética de edificios en el NEA: evaluación, diagnóstico, desarrollo de soluciones técnico constructivas y valoración costo-beneficio. Calificación energética de la edificación". Acreditado por la Secretaría General de Ciencia y Técnica de la Universidad Nacional del Nordeste - SGCyT-UNNE, Corrientes, Argentina. Resolución Nº 0155/2015-CS-UNNE 2015. Código del Proyecto: C001/2014.

  19. Edificio para viviendas - Madrid (España

    Directory of Open Access Journals (Sweden)

    Camuñas, Estudio de arquitectura

    1972-10-01

    Full Text Available This building consists of 8 floors with 94 apartments, business premises, caretakers' apartments, and a basement garage with room for 132 vehicles. As the allotment was quite deep and a courtyard facing the street was not required, spacious interior courtyards were created which give a great deal of light, liberal ventilation and a certain nobility to the apartments overlooking these courtyards. There is only one entrance hall in which are found the lifts and on to which the various stairs converge. It is treated in landscape form. The structure is of reinforced concrete and the system of floorings is continuous with neither girders nor projections.El edificio se compone de 8 plantas con 94 viviendas, locales de negocios, viviendas auxiliares para conserjes, y sótano- garaje capaz para 132 vehículos. Dado que el solar tenía mucho fondo y no estaba previsto patio de manzana, se crearon amplios patios interiores que permitieran grandes luces, ventilación pródiga y cierta nobleza a la parte de las viviendas recayente a dichos patios. El zaguán es único, y de él parten las distintas escaleras y núcleos de ascensores. Está tratado de forma paisajística. Tiene estructura de hormigón armado y el sistema de forjados es continuo sin viguetas ni resaltos.

  20. 2 obras de Marcel Breuer - U.S.A. : Edificio central para el departamento de edificación y desarrollo – Washington

    Directory of Open Access Journals (Sweden)

    Breuer, Marcel

    1970-10-01

    Full Text Available This building, in horizontal projection, has the form two Y's, joined at the base. It contains the offices of the above Department. It includes a large cafeteria, catering for three to four thousand employees, another smaller one, a library, offices, parking facilities and other services. It has been designed on a modular unit. Its external enclosure consists of prefabricated concrete units, each weighing 12 tons. The partitions are transportable, so that they can be easily relocated in accord with changing requirements, and thus giving the building a large measure of functional adaptability.El edificio, que adopta en planta la forma de dos «Y» unidas por su base, contiene las oficinas del Departamento enunciado. Dispone asimismo de: una gran cafetería que da servicio a los 3.000 o 4,000 empleados; otra más pequeña; biblioteca; dependencias de la administración; aparcamientos; etc. Diseñado modularmente, sus muros exteriores han sido construidos a base de paneles prefabricados, de hormigón visto, de 12 t. Los elementos de compartimentación son desmontables, lo que permite desplazarlos y adaptarlos a futuras distribuciones, imprimiendo una gran flexibilidad de funcionamiento al inmueble.

  1. Technological advances in zero energy buildings; Avances tecnologicos en edificios de energia cero

    Energy Technology Data Exchange (ETDEWEB)

    Gonzalez Milla, Guillermo; Perez Rebolledo, Hugo; Acoltzi Acoltzi, Higinio [Instituto de Investigaciones Electricas, Cuernavaca, Morelos (Mexico)

    2011-07-01

    Buildings use a large amount of energy to operate and are one of the main sources of contaminating emissions. A building is a complex system and all of their components contribute to the total energy demand. The technology to construct zero-energy buildings is already available, but obstacles exist such as the lack of information and technical training of architects and engineers to design highly energy efficient buildings. The present article describes the progress to-date and the future prospects for the design and construction of zero-energy buildings, as well as the problems involved in its implementation. [Spanish] Los edificios usan una gran cantidad de energia para operar y son una de las principales fuentes de emisiones contaminantes. Un edificio es un sistema complejo y todos sus componentes contribuyen a la demanda total de energia. La tecnologia para construir edificios de energia cero ya esta disponible, pero existen barreras como falta de informacion o capacitacion tecnica a arquitectos e ingenieros, para disenar edificios de alta eficiencia energetica. El presente articulo muestra los avances a la fecha y la prospectiva para el diseno y construccion de edificios de energia cero, asi como la problematica para su implementacion.

  2. Experiencias obtenidas del empleo de los diferentes tipos de muros cortina. España

    Directory of Open Access Journals (Sweden)

    Azpiazu Ordóñez, José Ramón

    1991-12-01

    Full Text Available Nowdays, the façade built of curtain walls made of varnished aluminium profiles and glass presents no problem. Its watertightness is guaranteed and with the Climalit and Termophane glasses of 6/12/6, 8/12/6 o 6/12/6/12/6 mm depending on the case, the acoustic and heat insulations are resolved. Structurally, we can distinguish the following variants: (see the graphic on page 21. 1.°—Profiles seen in four directions. 2º—Profiles seen in the horizontal direction and hidden In the vertical direction (structural two face silicone. 3º—Profiles seen in the vertical direction and hidden in the horizontal direction (structural two face silicone. 4.°—Hidden profiles (structural four face silicone. The system which is structurally the safest is the first one and it is recommended especially for the façades of a very marked curvature, which, when decomposed to registered polyhedrons, from very pronounced angles between contiguous sides. For buildings in which we want to achieve a sensation of horizontally, we will use the system n.° 2 and in case the sensation of verticality is sought, the n.° 3 will be used. When trying to get a tall building weighing as little as possible and floating in the clouds, we use the system n.° 4. The last one represents Mies Van Der Rohe's antithesis for marking the structure on the outside as much as possible.

    Hoy día la fachada construida con muro cortina de perfiles de aluminio lacado y vidrio no tiene problemas. Su estanquidad está garantizada y con los vidrios Climalit o Termophane de 6/12/6, 8/12/6, ó 6/12/6/12/6 mm, según los casos, el aislamiento acústico y calorífico está resuelto. Estructuralmente podemos distinguir las variantes siguientes (ver gráfico, página 21: 1.°—Perfiles vistos en las cuatro direcciones. 2.°—Perfiles vistos en dirección horizontal y ocultos en vertical (silicona estructural a dos caras. 3.°—Perfiles vistos en dirección vertical y

  3. Para Falar de Disciplina, Corpos e Conhecimentos. Entre os Muros da Escola

    Directory of Open Access Journals (Sweden)

    Pastoriza, Bruno dos Santos

    2015-05-01

    Full Text Available This essay is developed on the basis of an ideal scenario extracted from de movie The Class and real school experiences. In this way, relations (power relations are outlined on the school. In each analytical movement, a dynamic action between school and other spaces, institutions and subjects is presented and their articulations are commented. With focus on the school walls, the scenario constructed in the movie, and articulated with real experience, is discussed in conjunction with authors such as Michel Foucault. Microanalysis of school spatiality, bodies, and knowledge rises from discussion on disciplinary power action. The economy and efficiency of disciplinary power in the school and their walls are commented as an important point to problematize. A partir de um cenário idealizado no filme Entre os Muros da Escola e de outros que percorrem experiências reais é que se desenvolve este ensaio. Nesse sentido, a proposta é evidenciar uma série de relações (com ênfase nas relações de poder que são traçadas nesse lócus escolar e que, a cada movimento tanto o põem numa conjuntura de outros espaços, instituições, sujeitos, quanto o localizam e, sobre ele, agem. Dando destaque para a ideia da evidenciação dos muros que percorrem a escola, o texto realiza um trabalho de pensamento no qual confluem práticas de escolas reais, da escola de Cantet e Bégaudeau (autores do filme e, ainda, proposições de autores como Michel Foucault. Emergem no ensaio, então, microanalíticas da espacialidade escolar, dos corpos que ali se encontram disciplinados e dos conhecimentos que, assim como os corpos, se organizam nessa mesma lógica. Dos encaminhamentos, surge o destaque para a economia e eficiência do poder disciplinar que percorre a escola e, por uma série de elementos, avigora seus muros.

  4. Eficiencia energética de los edificios: repercusión medioambiental

    Directory of Open Access Journals (Sweden)

    Maria Nieves Pacheco Jiménez

    2009-06-01

    Full Text Available Los recientes Planes, Estrategias y normas atinentes al fomento de la eficiencia energética en los edificios1 nacen en un contexto de preocupación por el cambio climático y sus consecuencias. Todos ellos persiguen la reducción de costes energéticos y la promoción de la sostenibilidad económica, política y ambiental. Un reflejo de esta inquietud por el bajo impacto ambiental puede observarse en el sector de la vivienda, cuyo consumo final de energía es muy elevado, y en la consiguiente intención de construir edificios bioclimáticos que aprovechen la energía del entorno. En aras a la consecución de estos objetivos, el Plan de Acción 2008-2012 impulsa una serie de medidas que recaen sobre el sector transporte, la industria, el sector residencial y el sector terciario, articulándose en torno a cuatro líneas de actuación: transversal, de movilidad, de edificios y de ahorro eléctrico. Este estudio aborda las pautas de ahorro y eficiencia energética propuestas para los edificios, tanto existentes como de nueva construcción, así como residenciales y del sector terciario. Para ello se hace imprescindible la remisión al concepto de “calidad” de los edificios, contemplado en la propia Exposición de Motivos de la Ley 38/1999, de Ordenación de la Edificación, y ligado estrechamente a la eficiencia energética de aquéllos.

  5. Edificio para oficinas en Hartford, Estados Unidos

    Directory of Open Access Journals (Sweden)

    Sherwood, Mills y Smith, Arquitectos

    1961-05-01

    Full Text Available Este edificio ha obtenido el primer premio del Instituto Americano de Arquitectos, en 1960, y el Certificado de Mérito para un proyecto destacado, en 1959, de la Asociación de Arquitectos de Nueva York.

  6. Modelo no lineal en elementos finitos para muros livianos con entramados de acero sujetos a carga lateral

    Directory of Open Access Journals (Sweden)

    Carlos Andrés Gaviria M.

    2013-01-01

    Full Text Available En este artículo se presentan los resultados de una investigación que tuvo como propósito modelar con elementos finitos el comportamiento a cargas laterales de los muros livianos compuestos de un entramado típico de acero para diferentes materiales de revestimiento. Se inició con la recopilación de información de ensayos de caracterización en los elementos del muro y las conexiones entre estos, a partir de esta información y la investigación realizada por [1] se construyó un modelo de elementos finitos que considera el comportamiento no lineal de las conexiones entre los elementos. Este modelo fue ajustado con la información de los ensayos ante carga lateral realizados en probetas a escala real para cinco configuraciones de revestimiento. En este proceso se encontraron grandes diferencias entre los parámetros del modelo ajustado y los iniciales que son atribuidas a la interacción entre los componentes del muro liviano. La validación del modelo se realizó prediciendo los resultados experimentales de una nueva configuración en la cual se combinan varios materiales, obteniendo un error del 6.9%. Este resultado indica una buena capacidad de predicción del modelo para otras posibles configuraciones de revestimiento.

  7. Edificio Tavaro, Ginebra

    Directory of Open Access Journals (Sweden)

    Addor y Julliard, Georges

    1961-10-01

    Full Text Available El edificio se ha construido con fines administrativos, con objeto de agrupar las oficinas y zonas de recepción, de la fábrica de máquinas de coser "Elna". Mediante la distribución en planta y en sentido netamente longitudinal, a lo largo de la carretera Chatelaine y con retranqueo respecto de esta vía de gran tráfico y ruido, así como previendo un gran espacio verde entre esta pantalla constructiva de líneas modernas y la fábrica, situada al fondo .del solar, se ha conseguido aislar las oficinas de ambas zonas ruidosas.

  8. Edificio en Bolonia

    Directory of Open Access Journals (Sweden)

    Tagliaventi, Ivo

    1964-06-01

    Full Text Available This building belongs to a branch of a German firm of car manufacturers. The ground area covered by the building is about 550 m2. The basement is taken up with a store of spare parts. The ground floor serves as workshop and garage. There are two storeys occupied with the firms' offices, and five more storeys devoted to living apartments. The latter have an independent stairs. The volume distribution of this project has been carefully thought out, so that its various functions can be served in the best possible manner, within an integrated architectural conception. Materials have also been chosen to harmonise as much as possible with the general character of the building, and the reinforced concrete structure has been left partly visible, both externally and internally. The design of the apartments is such that these are not too expensive, since they are meant to be occupied by people of the middle income group. The various flats only differ from each other in slight variations. The external aspect of the building shows a dynamic and contrasting quality, which takes fully into account the sorrounding environment.Este edificio, que ha sido construido por la filial de una casa alemana de automóviles, tiene una superficie media de 550 m2 por planta y consta de: sótano, para el almacenamiento de las piezas de recambio; planta baja, utilizada para talleres y garajes, que se extiende hasta la zona ocupada por la nave preexistente; dos plantas, destinadas a oficinas de dicha filial, y cinco plantas, ocupadas por viviendas. Estas últimas están servidas por escaleras independientes. Gracias a cuidadosos estudios volumétricos se han podido obtener las debidas articulaciones y espacios requeridos para el correcto uso del edificio y diferenciar sus distintas partes, dedicadas a misiones diversas, de manera que, incluso dentro de una unidad arquitectónica y constructora, la forma pueda denunciar claramente la función. La misma finalidad se ha

  9. Barajas-park. Edificios para industria limpia

    Directory of Open Access Journals (Sweden)

    Argeles, J. Ramón

    1990-12-01

    Full Text Available During the last 20 years the concept of BUILDINGS FOR INDUSTRIAL USE has involved and has produced an important change in REAL STATE PRODUCTS. The ergonomic differences between INDUSTRY and SERVICES tend to decrease as far as technological advances are concerned. New Company Management Techniques favor the creation of technical and commercial teams to study projects and products and this highly-qualified personnel requires a comfortable atmosphere and surroundings. Warehousing has also progressed. Stock volumes have been reduced in favor of faster rotation. At present, commercial buildings are designed with interaction functions in mind. The space's sensitivity is translated in an economic diversification process. The objective is to design buildings that attract different types of companies, offering all of them identical efficiency. Facility for development and evolution of the companies, with simple modifications, optimizing internal! and external communications, with provisions for parking. Facility for incorporating diverse and sophisticated services. A building with these characteristics offers: A good location. Good Communications. Good natural lighting. High-quality structural design. Good insulation. Large open interior spaces. Capacity to incorporate sophisticated installations and services. Attractive scenery/views and a good neighborhood.

    En los últimos 20 años ha evolucionado el concepto de Edificios de uso industrial produciendo un importante cambio en los productos inmobiliarios. En tecnologías avanzadas las diferencias ergonómicas entre industria y servicios tienden a reducirse. Nuevas Técnicas de Gerencia Empresarial favorecen que alrededor de proyecto o productos se creen equipos compuestos por técnicos y comerciales; para este personal, altamente cualificado, se necesita crear ambientes y entornos agradables. La función de almacenamiento también ha evolucionado, el volumen de stock se reduce, y a

  10. Edificio Foster Wheeler. Madrid/España

    Directory of Open Access Journals (Sweden)

    Arangüena, José María

    1988-04-01

    Full Text Available This article describes in detail the characteristics of a building in Madrid whose structure, in reinforced concrete, is set into the foundation with individual footings. Services are found in a nucleus made up of a concrete element, designed to stabilize the whole of the structure with respect to horizontal forces. All parts of the building have been designed and constructed in accordance with existing regulations.

    Este artículo describe, con detalle, las características de un edificio construido en Madrid, cuya estructura se tía realizado en hormigón armado y cimentada sobre el suelo mediante zapatas individuales. El núcleo donde se encuentran los servicios es un elemento de hormigón, cuya misión estructural consiste en estabilizar el conjunto de la estructura frente a los esfuerzos horizontales. Todos los elementos del edificio han sido realizados de acuerdo con la Normativa Vigente.

  11. Edificio residencial en Montreux – Suiza

    Directory of Open Access Journals (Sweden)

    Jean Serex, S. A., Estudio de arquitectura

    1974-06-01

    Full Text Available This building has been constructed on a beautiful plot next to the lake in the Flower Avenue in Territet. It assumes the shape of a truncated pyramid, with a subterranean floor for installations and garages and 5 apartment stories. Special foundation, structure of reinforced concrete and curtain walls consisting of various prefabricated members. The numerous problems caused by the laws of the area have been studied and solved successfully, as well as the shape of the building and the adaptation to the terrain. Thus an extremely satisfactory result has been obtained in view of the residential requirements.Este edificio ha sido construido sobre un bello solar, junto al lago, en el paseo de las Flores de Territet. Adopta la forma de pirámide truncada, con un sótano para instalaciones y garajes, y cinco plantas de apartamentos. Cimentación especial, estructura de hormigón armado y cerramientos a base de elementos varios prefabricados. Se han estudiado y resuelto acertadamente los múltiples problemas originados por las Ordenanzas de la zona, la forma del edificio y la adaptación al terreno, obteniendo un resultado sumamente satisfactorio a todas las exigencias residenciales previstas.

  12. Edificio de apartamentos en Arbon, Suiza

    Directory of Open Access Journals (Sweden)

    Dubois, G. P.

    1965-09-01

    Full Text Available The building involves a total of 95 flats, of three main types: 64 flats of 4 rooms, 25 flats of 3 rooms, and 6 flats of 2 rooms. There are also secondary facilities, such as garages, which are situated to the east and west of the building, at ground level. This is due to the presence of underground water 1 m below the surface. On the green spaces round the building sports facilities have been provided, such as football and basket-ball pitches, and also playgrounds for children.El edificio alberga un total de 95 apartamentos de tres tipos diferentes: 64 apartamentos de cuatro piezas y media, 25 de tres piezas y media, y 6 apartamentos con dos piezas y media. Una serie de locales secundarios—sótanos y garajes—están situados al E. y al O. del inmueble, edificados sobre el nivel del terreno, por haber encontrado la capa de agua subterránea a 1 m de profundidad. En las zonas verdes que rodean al edificio han sido organizados campos de deportes—fútbol, baloncesto, etc.— y lugares de juegos para los niños.

  13. Edificio de protección de las termas romanas de Sant Boi de Llobregat (Barcelona, España

    Directory of Open Access Journals (Sweden)

    González Moreno-Navarro, A.

    1999-10-01

    Full Text Available The roman baths at Sant Boi de Llobregat were built sometime around the year 200 BC and came to light in 1953. They are some of the best baths of this type to be found preserved in Catalonia. Some of the walls are almost five meters high, which is rare. There were originally seven rooms, and interesting remains of six of them can still be seen today. The baths were virtually abandoned in 1975, but restoration began in 1988, including the construction of a building to protect them and to enable the public to visit them. The design of the presentation trusts entirely to the emotion felt on seeing these ruins at first hand, and other elements, such as audio-visual effects or virtual reality, have been rejected.

    Las termas romanas de Sant Boi de Llobregat, construidas hacia el año 200 dC y descubiertas en 1953, son una de las instalaciones de este tipo mejor conservadas de Cataluña. Algunos de los muros alcanzan casi cinco metros, hecho poco habitual, y se mantienen seis de las siete salas de las que constaron, con restos muy interesantes. Casi abandonadas desde 1975, en 1988 se inició su recuperación definitiva y la construcción de un edificio que las protegiera y permitiera la visita pública. En su presentación se ha confiado toda la emoción del espectador a la contemplación directa de las ruinas y se ha renunciado a artificios, como audiovisuales efectistas o realidad virtual.

  14. Metodología de inspección higrotérmica para la determinación de un factor intensidad de evaporación en edificios históricos

    Directory of Open Access Journals (Sweden)

    García-Morales, S.

    2012-12-01

    Full Text Available This paper presents what we call “Hygrothermal Inspection”. It consists in a first step in the way to quantify real water flux across constructions. Theoretical aspects are related to the fact that a wall, affected by rising damp, suctions water that will then evaporate from the surface, towards the internal and external air. This flux increases the humidity ratio of the internal air, mainly in the thin air coat in contact with the wall or pavement. This fact allows us to measure the relative evaporation intensity by means of a thermohygrometer and to map evaporation zones. Measuring method and results analysis are shown. Different evaporation levels from the walls or pavements are established by means of calculating what we call “Evaporation Intensity Factor (Fi”. Some results from several years work on Heritage Buildings are presented.

    En este artículo se presenta lo que hemos denominado “inspección higrotérmica”, que consiste en un primer paso en el diagnóstico de flujos de agua a través de los elementos constructivos. El fundamento se basa en que un muro afectado por un problema de capilaridad está sometido a una succión con un determinado caudal y esta agua evaporará en la superficie del muro o del suelo, incrementando el contenido en humedad (W de la lámina de aire en contacto con el paramento. Se describe el método de inspección y de análisis de los resultados. Se utiliza un termohigrómetro de lectura directa, y las lecturas se hacen siguiendo un protocolo que permite el análisis de variables. Los niveles de intensidad de los focos se establecen a partir de lo que hemos denominado “Factor de Intensidad de evaporación (Fi”. Se ilustra el método con ejemplos de estudios en varios edificios históricos.

  15. Edificio "Forestal Bío-Bío"

    OpenAIRE

    Gonzalo Cerda Brintrup

    1992-01-01

    "Serie Concepción" es una nueva sección que inauguramos con este número, destinada a mostrar edificios de la ciudad de Concepción, que destacan por sus cualidades arquitectónicas. Constituye, por consiguiente, un catastro de arquitectura contemporánea, que busca abrir un espacio para el análisis de la producción arquitectónica de nuestra ciudad.

  16. Evaluación higrotérmica y energética de un edificio escolar perteneciente al programa nacional 700 escuelas, en el área Metropolitana de San Juan, Argentina.

    Directory of Open Access Journals (Sweden)

    María Guillermina Re

    2016-12-01

    Full Text Available El objetivo de este trabajo es evaluar el comportamiento higrotérmico y energético anual de un edificio escolar perteneciente al Programa Nacional 700 Escuelas, en el Área Metropolitana de San Juan, Argentina. Para ello, se efectúa el cálculo estacionario aplicando las Normas IRAM y se procesan los monitoreos realizados en tres momentos claves de los años 2013 y 2014, con el edificio en condiciones reales de ocupación, los cuales se relacionan con lecturas diarias de consumo energético. Adicionalmente, se estudian los niveles de confort en tres aulas mediante el método Fanger, determinando con un software específico los índices PMV y PPD. Por último, se computan los consumos históricos eléctricos y de gas, y se calculan los valores por unidad de superficie, que se comparan con antecedentes nacionales y estándares internacionales. El análisis llevado a cabo, a partir de la consideración de datos teóricos y empíricos, permite concluir que con un consumo anual promedio de 88 kWh/m2 el edificio cumple estándares internacionales de eficiencia energética escolar, sin embargo, su desempeño térmico es deficiente en las estaciones frías y cálidas, con ambientes que escapan de la zona de confort gran parte del tiempo. 

  17. Aeropuerto internacional de Los Angeles: Edificio "Theme"

    Directory of Open Access Journals (Sweden)

    Editorial, Equipo

    1961-10-01

    Full Text Available Recientemente, se ha terminado un nuevo edificio en el aeropuerto de Los Angeles, que constituye una estación aérea, moderna por su forma y servicios de que está dotada, en la que se ha dado cabida a todas las necesidades actuales que el servicio de aeronaves reactores requiere.

  18. Medidas de mejora de la eficiencia energética de edificios residenciales

    OpenAIRE

    Hernández Sánchez, Juan Manuel

    2012-01-01

    El parque de edificios residenciales existente tiene un potencial muy grande para mejorar la eficiencia energética a corto y medio plazo, debido al gran número de viviendas existentes y a su larga vida residual. Los factores que influyen directamente en el consumo energético y en las emisiones asociadas a los edificios residenciales son: la envolvente térmica, la eficiencia energética de los equipos, las fuentes energéticas utilizadas y el comportamiento de los usuarios. Las barreras qu...

  19. Edificio Eiffel

    Directory of Open Access Journals (Sweden)

    Niemeyer, Oscar

    1957-11-01

    Full Text Available Oscar Niemeyer ha resuelto este bloque de viviendas con originalidad de fachadas y acertada composición de volúmenes. Su emplazamiento, en la Plaza de la República de Río de Janeiro, ha sido felizmente aprovechado al resolver su alzado principal a ella con gran diafanidad, alternando las superficies acristaladas y paneles de piezas prefabricadas perforadas. El cuerpo central se eleva airoso sobre los laterales, más bajos, apoyándose todo el conjunto sobre una base de apariencia mas sólida —la zona comercial—, cuyo cuerpo superior, liso y blanco, está monótonamente modulado por una serie de pequeñas ventanas. El edificio se destina a viviendas. En él se distribuyen 54 apartamentos, todos ellos de tipo Duplex, con absoluta separación entre las zonas nobles y de servicio. De sus 12.800 m2 de superficie construida, sólo 9.940 m2 son de área útil.

  20. Intelligent buildings vs. bioclimatic design; Edificios inteligentes vs. diseno bioclimatico

    Energy Technology Data Exchange (ETDEWEB)

    Aguayo Gonzalez, Ricardo [Tecnologico de Monterrey (Mexico)

    2006-10-15

    Present the form of intelligent buildings designing is the article purpose. Those kinds of edifications take advantage of climatic conditions which allow the users comfort and the efficient electric power use, avoiding the polluting agents. It also shows the four next following stages to design an intelligent building to know: the dry weather and relative dampness schedule variations during a year in the building location; the predominant winds direction, intensity and schedule frequency; the cloudiness, rain, etc and how to use the Givoni diagram to obtain the natural air-conditioning strategies and reach the thermal comfort. [Spanish] El proposito de este articulo es presentar la forma de disenar edificios Inteligentes, los cuales aprovechan las condiciones climaticas que permiten el confort de los usuarios y el uso eficiente de la energia electrica, evitando asi la emision de agentes contaminantes. Tambien menciona los siguientes cuatro pasos para el diseno de un edificio inteligente: conocer las variaciones horarias de temperatura seca y humedad relativa durante un ano en el lugar donde estara el edificio, saber la direccion, intensidad y frecuencia horaria de los vientos dominantes, tener conocimiento de la nubosidad, lluvia, etc. y utilizar el diagrama de Givoni para obtener las estrategias de climatizacion natural para obtener el confort termico.

  1. Edificio del trust Harris y banco Savings

    Directory of Open Access Journals (Sweden)

    Skidmore, Owings y Merrill, Arquitectos Ingenieros

    1963-09-01

    Full Text Available This large Chicago project consists of three structures: a new 23 storey block containing the bank and other offices; the central building, with 20 floor levels, recently adapted to present day requirements, and an old garage,' also reconstructed and utilised by the bank. The new building has two distinct functional zones: the lower part, occupied by the bank; and the top 10 storeys which are let as office space. Between the two zones, floor levels 11 and 12 are devoted to general services and installations. On floor 23 the director has his office, and there is also space for a council room and a dining hall for guests. Externally the building is in the form of interesting and contrasting planes and volumes. This gives it a more expansive aspect, which is most necessary owing to the closely built area where it is situated, and enhances an impression of vitality and positive interaction between its structural elements. As a whole this building constitutes a satisfactory solution of the problem of adding a new building to two other already existent ones, so that the character of the latter is maintained, although new techniques are adopted. This project is also noteworthy because of its proportions, elegance and right choice of materials and colour.Construido en Chicago, este rascacielos comprende tres edificios: la nueva torre, de 33 plantas —que aloja las dependencias del Banco y Oficinas—; el edificio central, de 20 plantas —ya existente—, que ha sido adaptado a las necesidades actuales; y un antiguo garaje, asimismo acondicionado para ampliar el espacio del Banco. Analizando el nuevo edificio, distinguimos dos zonas: la inferior, ocupada por el Banco, y las diez plantas superiores, para oficinas en alquiler. Estas zonas aparecen separadas por los pisos 11 y 12, que contienen las instalaciones generales. En el piso 23 se distribuyen las oficinas del director, la sala de Consejos y el comedor para invitados. El aspecto exterior de esta

  2. Técnicas de Control del Confort en Edificios

    Directory of Open Access Journals (Sweden)

    M. Castilla

    2010-07-01

    Full Text Available Resumen: La mayor parte del tiempo, las personas realizan sus actividades cotidianas en el interior de edificios, siendo por tanto preciso controlar las condiciones de confort (térmico, visual y calidad de aire en el interior de los mismos, intentando minimizar el consumo energético simultáneamente. Este trabajo presenta una revisión de técnicas de control del confort en edificios. También muestra los resultados obtenidos en la implementación de un sistema de control jerárquico, que permite obtener situaciones de confort térmico adecuadas en el interior del CDdI-CIESOL-ARFRISOL (Contenedor Demostrador de Investigación - Centro de Investigación de la Energía Solar - Proyecto Singular Estratégico ARFRISOL de la Universidad de Almería. Palabras Clave: Control jerárquico, Confort térmico, Confort visual, Calidad de aire

  3. Evaluación de estructuras de muros resistentes

    Directory of Open Access Journals (Sweden)

    Lewicki, Bohdan

    1988-12-01

    Full Text Available The author of this article, who is one of the main International personalities in the field of the structural engineering, point out the importance of intuition as a component of the creative capacity of the engineer, as well as its necessity within de evaluation process of structures. The article includes also some Indications about the general principles on reliability of masonry structures.

    El autor del presente artículo, una de las máximas autoridades mundiales en el campo de la Ingeniería estructural, señala la importancia de la intuición como componente de la capacidad creadora del ingeniero y su necesidad en el proceso de evaluación de las estructuras. En el artículo se dan también unas indicaciones referentes a principios generales sobre fiabilidad de las estructuras de muros resistentes.

  4. Edificio Cogesol, en Madrid

    Directory of Open Access Journals (Sweden)

    Alas, Genaro

    1964-05-01

    Full Text Available The functions to be met by this building were as follows. The housing of the necessary machinery for the manufacture of caffein free coffee, reception store, silo, stores, nightwatchman's house, offices, garage and workshop, dressing rooms. As the northern side, facing the Barajas highway, was the more important, the main building of the factory was placed on that side. Along the south, facing a secondary access road, the office block, the staff rooms and the watchman's house have been located. Between the two nuclei is the loading yard. The manufacturing tower has a metal structure, slender and smooth. The vertical and horizontal columns and beams have been hidden within the rear wall, the intermediate partition and the lift shaft. The main longitudinal stabilising member crosses this lift shaft, hence the former is discontinuous. The wind pressure acting on the tower is transmitted to the adjacent building, but as the two are separated by a dilation joint, flexible thrust connections are fitted between them. The long structural members were erected in sections, and the weldings were done with great care to avoid subsequent deformations, which would have shown on the smooth exterior. To an external observer the factory zone stands out clearly from the rest, for the tower is enclosed largely in transparent glass, so that all the machinery can be seen from outside. The stores, on the other hand, are enclosed with brick walls, and enhance the light and transparent quality of the tower. This contrast is further developed by the relative volumes and shapes of the various parts of the project, which produce an organic but spectacular sense of dynamic unity.El programa de necesidades se desarrolló según el siguiente esquema: edificio para la maquinaria destinada a la fabricación del café descafeinado, almacén de entrada, silo, almacenes varios, vivienda para el guarda, oficinas, garajes y taller y vestuario. Como de las dos fachadas principales

  5. Certificación energética de edificios en España y sus implicaciones económicas

    Directory of Open Access Journals (Sweden)

    Ruá, M. J.

    2012-09-01

    Full Text Available Under the European Energy Performance of Buildings Directive, the Member States must develop methods to certify energy efficiency of buildings. Calener-VYP v1.0 is the only Spanish official tool to certify a high energy efficiency performance of residential buildings, through the general option. It has two indicators implemented, CO2 emissions and primary energy consumption. However, in the process of energy rating a building, only the CO2 emissions indicator is considered. The economic consequences of this are studied, by means of simulating real properties with different construction assemblies and building services in the twelve Spanish climatic zones and calculating their costs. The results show that having a better energy rate in Calener VYP does not necessarily entail a lower consumption cost. Therefore, it is necessary to include the annual primary energy consumption indicator, because its absence involves that costs cannot be used as an argument when promoting energy efficiency among users.

    Bajo la Directiva Europea sobre eficiencia energética de los edificios, los Estados Miembros deben desarrollar procedimientos para certificar energéticamente los edificios. Calener-VYP v1.0 es la única herramienta oficial española para certificar una elevada aptitud en eficiencia energética de edificios residenciales, por el método general. Tiene dos indicadores implementados, emisiones de CO2 y consumo de energía primaria. Sin embargo, en el proceso de otorgar la calificación energética, solamente se consideran las emisiones de CO2. Las implicaciones económicas de esto se estudian simulando viviendas con diferentes características constructivas e instalaciones en las doce zonas climáticas españolas y calculando sus costes. Los resultados muestran que una mejor calificación energética en Calener-VYP no implica necesariamente un menor coste de consumo energético. Por tanto, es necesario

  6. Una propuesta para la arquitectura informática del sistema de control de un edificio

    Directory of Open Access Journals (Sweden)

    Triviño Barros, Gracián

    2004-12-01

    Full Text Available Nowadays, in order to perform the optimal installations automatic control, buildings structure incorporates a new kind of computers which are different from the desk computers dedicated to user’s personal tasks.These computers spread in the form of a network that is overlapped with the building structure in such a way that soon we shall speak about the computer omnipresence in the building.The building control system is considered in this paper as an intelligent agent. This means a control system provided with sensors and actuators to interact with its environment. This control system must develop its activity in order to get autonomously the programmed goals. A generic control building architecture is presented as a step towards the systematic development of control building systems.A project for the development of a software tool is also presented. This tool intends to support and make easy the programming of such kind of control systems. This project is been developed in the Department of Photonic Technology at Universidad Politécnica of Madrid.La necesidad de realizar un control automático óptimo de las instalaciones de un edificio ha provocado que un nuevo tipo de ordenadores, diferentes de los ordenadores de sobremesa que utilizan personalmente los habitantes del edificio, entren a formar parte de la arquitectura del propio edificio.Estos ordenadores se van extendiendo en forma de una red imbricada con la propia estructura del edificio de tal manera que pronto podremos hablar de la omnipresencia del ordenador en el edificio.En este trabajo se plantea el sistema de control del edificio como un agente inteligente, como un sistema que dotado de sensores para percibir su entorno, y de medios de actuación para modificarlo, realiza permanentemente ciertas operaciones de procesamiento de información y acciones sobre el propio edificio persiguiendo de manera autónoma alcanzar los objetivos para los que ha sido diseñado.Como un paso

  7. Edificio Van Leer. Holanda

    Directory of Open Access Journals (Sweden)

    Breuer, Marcel

    1965-02-01

    Full Text Available This building houses the offices of a large industrial firm. The central part of the building is H shaped and has two floor. The general services, washrooms, dressing rooms, stores, archive and mechanical equipment are housed on the ground floor. This level also provides communication between the offices in the wings and the staff canteen. The top floor has a hall-cum-reception room, the exhibition of the firms products and a section of the offices. The two lateral wings, which are Y shaped in planform, are taken up with offices on both floor levels. This building clearly shows the touch of a master designer in its layout, finish and details. It is a most perfect solution in terms of its location, its function and its human requirements.El complejo aloja las oficinas de una gran empresa industrial. El cuerpo central del edificio principal—en forma de H—tiene dos plantas: la baja comprende los servicios generales, aseos y vestuarios para empleados, almacenes, archivo, equipos mecánicos, etc., y sirve de calle y comunicación entre los niveles inferiores de las alas de oficinas y la cantina para empleados. La planta alta alberga el vestíbulo, utilizado también como sala de recepción, espera, exposición de los productos fabricados por las factorías de la empresa y parte de oficinas. Las dos alas laterales—con plantas en forma de V—alojan, en sus dos niveles, las oficinas generales. El planteamiento, acabado y detalles de este inmueble muestran la mano de un maestro, que ha realizado un trabajo perfecto, teniendo en cuenta el emplazamiento—Holanda—, el lugar y el cometido a que se destina el edificio.

  8. Columnata Moderna

    Directory of Open Access Journals (Sweden)

    Eduardo Meissner Grebe

    1986-12-01

    Full Text Available La arquitectura del movimiento moderno preconizó un replanteamiento estilístico total del edificio acompañado de una simplificación geométrica del volumen, y reconoció la necesidad de considerar en el diseño de la obra el avance tecnológico contemporáneo. De esta manera la técnica del hormigonado continuo y el muro cortina, libre de obligaciones resistentes, traerían consigo no sólo una revolución de las posibilidades estructurales, con sus respectivas transformaciones de función, sino también un cambio en la concepción estética del edificio y de su papel en la configuración del espacio urbano circundante.

  9. Edificio administrativo de Ciba-Geigy Basilea – Suiza

    Directory of Open Access Journals (Sweden)

    Burckhardt, Martin H.

    1975-10-01

    Full Text Available This building consists of two identical blocks —with four storeys above ground and a basement— connected by a third body in which the main entrance of the complex is located. The two first mentioned units have rectangular platform and contain: basement with technical installations; ground floor with a restaurant and a kitchen for the staff, service rooms and an air raid shelter; and on the three upper floors the offices are located which are reached by means of the connecting body. The offices are planned as office-landscapes thus forming a single space that occupies the entire floor. The working places have been placed in the periphery and in the centre the auxiliary rooms. The complex is completed by a three level parking place, situated on the other side of the approach road and joined directly to the building entrance by means of a subterranean passage.Este edificio está constituido por dos bloques idénticos, de cuatro alturas y sótano, enlazados por un tercer cuerpo en el que figura la entrada principal del edificio. Los primeros, de planta rectangular, tienen: sótano, con locales técnicos; planta baja, con restaurante y cocina para el personal, locales de servicio y un refugio para defensa antiaérea; y, en las tres plantas superiores, las oficinas, a las que se llega a través del cuerpo de enlace. Las oficinas son del tipo oficina-paisaje, formadas por un espacio único que ocupa toda la planta. Se han organizado colocando los puestos de trabajo en la periferia; y en la parte central, el grupo de locales auxiliares. El conjunto se completa con un aparcamiento, en tres niveles, situado al otro lado de la calle de acceso, y unido directamente a la entrada del edificio mediante un paso subterráneo.

  10. MUROS ABSURDOS E CONDIÇÃO HUMANA NA OBRA DE ALBERT CAMUS

    Directory of Open Access Journals (Sweden)

    Patrícia Oliveira Machado

    2015-04-01

    Full Text Available Albert Camus descreve a condição humana como sendo contingente, frágil e absurda, para isso ele utiliza a noção de “muros absurdos”, que são situações que enfrentamos e contra as quais não podemos escapar. Se a princípio, a morte, a velhice, a desumanidade parecem experiências banais, no pensamento camusiano, elas se revelam como possibilidade de tomada de consciência do absurdo de nossa condição. Palavras-chave: absurdo; condição humana; consciência.

  11. Edificio Daily Mirror

    Directory of Open Access Journals (Sweden)

    Williams, Owen

    1963-07-01

    Full Text Available The building has 18 levels. The Press occupies the 4 basement floors. The ground floor is taken up with the entrance hall, and an indoor carriage way. A snack bar and the telephone operators are situated on the second floor. The production department and the medical services are located on the third storey, whilst the fourth is occupied by the offices and library. The fifth floor is the beginning of the higher section of the building. This floor and up to including the 11th floor are devoted to office space, except for the 10th storey, which contains the office apartments of the directors and the Council Chamber. Equipment related to various services of the building is housed on the 12th storey. Finally, this tall building constitutes a fine landmark in the London skyline. The Daily Mirror building is outstanding for the appropriate nature, the completeness and the quality of its installations, which thus provide the most widely read paper in the world with outstandingly efficient offices.Este edificio consta de 18 plantas. El cuerpo de Prensa se aloja en los cuatro sótanos; los vestíbulos de entrada y una calzada interior para vehículos se hallan en la planta baja; la primera alberga un snack-bar y centralita telefónica; la segunda, el departamento de producción y centro de asistencia médica, y la tercera, las oficinas y biblioteca principales. La cuarta planta señala el comienzo del bloque alto; esta planta, junto con las quinta, sexta, séptima, octava y décima, están dedicadas a oficinas. La novena contiene las oficinas-apartamentos de los directores y salas de Consejo, y la undécima, la maquinaria para las diversas instalaciones del edificio. La elevada torre constituye un grandioso hito de referencia en esta zona de Londres. El «Daily Mirror» se distingue por el acierto, número y perfección de sus instalaciones, que proporcionan, al periódico de mayor actualidad mundial, las más adecuadas y amplias oficinas modernas.

  12. Edificio Lonza, S. A., en Basilea, Suiza

    Directory of Open Access Journals (Sweden)

    Suter & Suter, Arquitectos

    1966-07-01

    Full Text Available The building has three basements, ground floor and 19 storeys above ground. The basements accommodate such things as the telephone exchange, stores, and records offices. The ground floor is an open space, with some seats, and the glass enclosed cabin for the concierge. The 18 top floors are mainly devoted to office space, and the 19th also contains many of the building's installations. The materials and constructive systems are very modem, and are the most adequate to the functions of the building, as well as those most suited to achieving a quick and low cost construction.El edificio consta: de tres plantas de sótanos, planta baja y 19 plantas de altura. En las plantas enterradas se distribuyen la central telefónica, almacenes, archivos, etc. La planta baja resalta por su diafanidad, y en ella sólo hay algunos grupos de asientos y la cabina de cristal para el conserje. Las 18 plantas siguientes albergan los despachos, y en la 19.ª se han dispuesto todas las instalaciones. Los materiales y sistemas constructivos adoptados han sido los más modernos y los más adecuados al uso del edificio, rapidez y economía de construcción.

  13. Estudio geotécnicos en suelos gravosos. Aplicación : edificio de 7 pisos y 2 sótanos

    OpenAIRE

    Velásquez Paredes, Víctor Martín; Velásquez Paredes, Víctor Martín; Velásquez Paredes, Víctor Martín

    2015-01-01

    El presente Informe de Suficiencia corresponde al proyecto inmobiliario "Edificio lnclán 673" de Vivienda Multifamiliar en el distrito de Miraflores y desarrolla los Aspectos Geotécnicos para el análisis y diseño de cimentaciones. El proyecto del conjunto residencial prevé la construcción de edificio de 7 pisos con 2 sótanos y está ubicado en la calle Coronel lnclán 673 en el Distrito de Miraflores, Provincia y Departamento de Lima. La parte estructural del edificio está en que es una s...

  14. Edificios con forjados postesados mediante tendones no adherentes. Edificio Mapfre-Vía Augusta, en Barcelona-España

    Directory of Open Access Journals (Sweden)

    Llombart Jaques, José Antonio

    1994-08-01

    Full Text Available The technique of unbonded tendons applied to post-tensioned flat-slabs of buildings of certain importance has not been very frequent in Spain to date; in fact, it was used on very few occasions. This article gives the basic characteristics of the post-tensioned floors comparing them with the conventional solutions of reinforced concrete floors. The second part of the article brings a description of the main aspects of the design and construction of the Mapfre-Vía Augusta building in Barcelona. This recently raised building has the floor construction with slabs post-tensioned by unbonded tendons.

    La técnica del postesado no adherente, aplicada a losas de forjado de edificios de cierta entidad, ha sido hasta el momento poco común en España, habiéndose utilizado solamente en contadas ocasiones. Se indican, en primer lugar, las características fundamentales de los forjados postesados y se establecen comparaciones con soluciones convencionales de forjados de hormigón armado. En la segunda parte del artículo se describen los principales aspectos de proyecto y construcción de la estructura del Edificio Mapfre-Vía Augusta, en Barcelona, de reciente construcción, cuyos forjados están constituidos por losas postesadas mediante tendones no adherentes.

  15. 2 Obras de A. Lamela: Edificios Sol y La Caleta en Palma de Mallorca

    Directory of Open Access Journals (Sweden)

    Lamela, A.

    1967-11-01

    Full Text Available 2 Buildings designed by A. Lamela Sol Building This is a commercial and apartments block, and has a basement, ground floor, and ten stories above it. On each of the top ten stories there are twelve apartments. The design of this building is highly influenced by the gardening that surrounds it. La Caleta Building This is another commercial and apartments building, consisting of a lower block, part of which is covered with a terrace, gardens and a swimming pool, and a higher block. The apartments are all similarly designed, and only vary in the number of bedrooms. The design is especially «clean», simple and up to date.Edificio SOL - Proyectado en 1960, Terminado en 1983 Destinado a edificio de apartamentos y comercial, consta de: planta de sótano, baja, primera y nueve plantas tipo. Los apartamentos están localizados en la primera planta y las plantas tipo, en número de doce por planta. En el desarrollo de este proyecto, la jardinería ha jugado un papel muy importante. Edificio La Caleta - Proyectado en 1961.Terminado en 1964. Este edificio de apartamentos y locales comerciales, consta: de un volumen «inferior» cubierto por una terraza ajardinada con piscina, y de un bloque «superior» Los programas de cada uno de los apartamentos son similares, variando únicamente el número de sus dormitorios. El conjunto construido se distingue por su arquitectura limpia, simple y actual.

  16. Seguimiento de la construcción de edificio 43 viviendas Av/ Juan XXIII Valencia

    OpenAIRE

    BURGOS ROMERO, LUIS

    2011-01-01

    Convenios con empresa. La obra prevé la construcción de un edificio de 41 viviendas VP + 2 viviendas libres, constando de 2 plantas sótano para uso de aparcamiento y trasteros, planta baja con local comercial, 8 plantas con 5 viviendas por planta y una planta ático con 3 viviendas. La obra está en su fase de estructura, habiéndose realizado las plantas de sótano. Burgos Romero, L. (2011). Seguimiento de la construcción de edificio 43 viviendas Av/ Juan XXIII Valencia. http://hdl.handle.net...

  17. Edificio de la radio en Eisenstadt – Austria

    Directory of Open Access Journals (Sweden)

    Peichl, Gustav

    1973-06-01

    Full Text Available These Studies have been made for a twostorey building, completely constructed in reinforced concrete. On the first floor, the heating, ventilation and air-conditioning installations; a shop; a lounge room for the employes and a filing room have been arranged. On the top floor are distributed: the study and control room; the office of the director; the information section; utility room and first aid room. A stairway communicates the two floors. Entry to the building is had through the vehicles' access of the first floor and by an overpass that connects the top floor with the parking area situated on the same level. The reinforced concrete employed in the construction of the building has been left visible on the outside paraments, in the hollow spaces of which metallic carpentry with single or double glass has been used, in accordance with the needs of acoustic insulation of the different areas.Se han planteado estos Estudios en un edificio de dos plantas, realizadas totalmente en hormigón armado. En la baja se dispusieron las instalaciones de calefacción, ventilación y aire acondicionado; un taller; una sala de estar para los empleados, y un archivo. En la superior se distribuyen: el estudio y la sala de control; las oficinas del director; la sección de información; oficio, y botiquín. Una escalera comunica ambas plantas. La entrada del edificio se realiza por el acceso de vehículos de la planta baja y por un paso elevado que comunica la planta alta con la zona de aparcamientos, situada al mismo nivel. El hormigón armado empleado en la construcción del edificio se ha dejado visto en los paramentos exteriores, en cuyos huecos se ha empleado carpintería metálica de cristal único o doble, según las necesidades de aislamiento acústico que tengan las zonas a las que sirven.

  18. Edificio de seguros, en Tokio, Japón

    Directory of Open Access Journals (Sweden)

    Komuten Co. Ltd., Takenaka

    1969-03-01

    Full Text Available This building has been erected by the Daiichi Mutual Life Insurance Co., and involves a tall tower with offices, which is the core of the project; another building accommodating the dining hall, as well as 40 one family dwelling; a further 22 houses also devoted to dwellings, each containing 18 family flats; a building of 8 storeys with rooms for single men; and a sports and recreation zone, with a club, a football ground, swimming pool and tennis courts. The office tower has basements, and 18 storeys. Below ground there are stores, machine room, and a control room for the building's installations. Floors 1st to 4th have a reception zone, data section, first aid facility, and lecture rooms. Floors 5 to 18 are devoted to offices, management rooms, and other lecture halls. The builidngs are fitted with all modem technical facilities.Comprende el conjunto construido por la Daiichi Mutual Life Insurance Company: el edificio de oficinas, ubicado en una torre que constituye el corazón del complejo; una edificación destinada a salón-comedor; 40 viviendas unifamiliares; 22 edificaciones dedicadas a vivienda, con 18 apartamentos familiares cada una; una unidad de 8 plantas de altura, con habitaciones para solteros; y la zona deportiva-recreativa, con una serie de instalaciones: club, campo de fútbol, piscina, pistas de tenis, etc. La torre de oficinas, que consta de sótanos y 18 plantas de altura, alberga en sus 2 plantas de sótanos: los almacenes, salas de máquinas, salas de control para los servicios del edificio, etc.; en las plantas 1.ª a 4.ª se distribuyen: la zona de recepción, centro de elaboración de datos, dispensario, sala de conferencias, etc.; y las plantas 5.ª a 18.ª contienen: las oficinas, dirección, secciones ejecutivas, salas de conferencias, etc. El edificio está dotado de todos los adelantos técnicos que proporciona el momento actual.

  19. Edificio de la Northrop Corporation's Ventura Division, en California – (U.S.A.

    Directory of Open Access Journals (Sweden)

    Martin, Albert C.

    1968-09-01

    Full Text Available The project includes the following: and administrative building, with the high ranking executives' offices, the financing and marketing sections, the departments of rents and those of public relations and industry; the engineering services building, which, in addition to offices, has design halls, a specialised library and other services; and the various laboratories. This set of buildings is most attractive externally, and is an audacious design, reflecting the future looking attitude of the firm.El conjunto construido comprende; el edificio de la administración, que alberga las oficinas de los altos empleados; las secciones de financiación y marketing de la Empresa, de rentas, relaciones públicas e industriales, etc. El edificio de los servicios de Ingeniería, que contiene, además de su zona correspondiente de oficinas, salas de diseño, una biblioteca especializada, etc.; y por último, adyacentes al edificio de fabricación, están los diversos laboratorios. Este conjunto resulta atractivo para el que lo contempla, constituye un ejemplo de proyecto atrevido y refleja la naturaleza futurista de la Compañía.

  20. Edificios industriales, en Wesel, Alemania

    Directory of Open Access Journals (Sweden)

    Henn, Walter

    1966-02-01

    Full Text Available The set of buildings constructed in Wesel by Siemens-Schuckertwerke is a factory of industrial turbines. The site has a railway siding, which greatly helps the transport of raw materials and finished articles. In addition to the industrial naves, there are offices, social amenities, and administrative buildings. The workshop naves have a reinforced concrete structure, and on the inner columns, longitudinal reinforced concrete girders support a travelling crane. The roof of these naves is provided with skylights, inclined at 45° to the horizontal, and symmetrically arranged in pairs. The roof is protected with a Siporex insulating layer, covered with two sheets of bitumen impregnated cardboard. The glazing of the skylights is Thermolux.El complejo de edificios industriales construidos en Wesel por Siemens-Schuckertwerke, está destinado a la fabricación de turbinas industriales. Se levanta sobre un extenso solar con acceso a una vía férrea, lo cual facilita el suministro de materias primas y expedición de los productos fabricados. El conjunto está formado por un edificio para la administración, otro de carácter social y recreo, otro para oficinas y varias naves para producción, almacenes y bancos de prueba. Las naves tienen estructuras de hormigón armado. En su interior se ha instalado un puente-grúa en sentido longitudinal, que se apoya en los soportes interiores. Para la suspensión de los carriles del puente-grúa se han construido vigas longitudinales de hormigón armado. La cubierta tiene una serie de lucernarios, de dos faldones a 45° que culminan en su caballete. Todas las superficies de cubierta se han protegido con una capa aislante de siporex recubierta con otras dos de cartón embreado. Las cristaleras y lucernarios son de thermolux.

  1. Edificio Mitre, en Barcelona, España

    Directory of Open Access Journals (Sweden)

    Barba Corsini, F. J.

    1969-10-01

    Full Text Available This project consists of seven blocks, each 12 storeys high. They have a common set of services, including central heating, parking, domestic aids, washing installations, snack bar, a pharmacy and a children's nursery. The ground floor of each block has shops, the main and the service vestibules, n porter's room, storage for parambulators, and refuse storage space. The first floor of each block is devoted to apartments, and the rest of the floors to flats. The project is so well planned and so constructed that it can be cited as an example of small sized flats organised in a large set of blocks.El edificio está formado por siete unidades o casas de 12 plantas, con servicios comunes a todas ellas: central de calor; aparcamiento; auxiliaría doméstica; lavandería; snack-bar; farmacia y guardería. La planta baja de cada unidad aloja: las tiendas; los vestíbulos —principal y de servicio—; portería; cuartos para coches-niños; cuarto de basuras; etc. La planta 1. está destinada a apartamentos, y las restantes se dedican a viviendas. El acierto logrado en su diseño determina el que pueda presentarse este edificio como ejemplo de realización destinada a viviendas pequeñas.

  2. Modelo de comportamiento estructural de muros entramados de madera en el siglo XIX en España

    Directory of Open Access Journals (Sweden)

    Santa Cruz-Astorqui, J.

    2014-12-01

    Full Text Available In this article the structural behavior of a timber- framed wall is analysed. The wall is composed by a timber grid of vertical parts (posts and horizontal elements (beams, whose panels are normally filled with plaster rubble. This system was widely used as a load-bearing wall system in the Spanish residential buildings between the 17th and 19th centuries. The research concludes that the loads are transmitted mainly through the infills by vertical compression, and that the deformation of the beams by bending is negligible, except in those cases in which there is no infill at the bottom. Also, using numerical simulation by finite elements, a formula determining the percentage of total loads absorbed by posts and infills is obtained depending on their rigidity to compression, so as to quantify the stress state of them. This is a fundamental aspect in the design and dimensioning of reinforcements in structural rehabilitation.En este artículo se analiza el comportamiento estructural del muro entramado de madera. Muro compuesto de una retícula de piezas verticales (pies derechos y horizontales (carreras, cuyos cuarteles se rellenan normalmente con yesones. Este sistema es ampliamente utilizado como muro portante en la edificación residencial española entre los siglos XVII y XIX. Del análisis, se concluye que las cargas se transmiten principalmente a través de los rellenos por compresión vertical, y que la colaboración de las carreras por flexión es despreciable, salvo en aquellos casos en los que no exista el relleno del cuartel inferior. Además, mediante la simulación numérica por elementos finitos, se obtiene una expresión que determina el porcentaje de carga total que absorben los pies derechos y los rellenos en función de sus rigideces a compresión, con el objeto de cuantificar el estado tensional de los mismos, aspecto fundamental en el diseño y dimensionamiento de refuerzos en rehabilitación estructural.

  3. Edificio de viviendas de obra nueva

    OpenAIRE

    Izquierdo Bonillo, Miguel Ángel

    2015-01-01

    Se va a construir un edificio de viviendas de uso residencial en la población de San Pedro del Pinatar. El proyecto básico y de ejecución de un bloque de viviendas es solicitado por la Universidad Politécnica de Cartagena y será realizado por Miguel Ángel Izquierdo Bonillo, con D.N.I. 75148358-K, y se desarrolla ajustándose al programa de necesidades y sugerencias de la Universidad Politécnica de Cartagena, dirigido por el tutor Juan Francísco Maciá Sánchez, en consecuencia ...

  4. Sistema distribuido para monitorización y control integrado de edificios

    Directory of Open Access Journals (Sweden)

    Gomes, L.

    1999-02-01

    distribuido destinado a la monitorización y control integrado del edificio. El sistema puede también servir de apoyo para actividades económicas y servicios. El concepto de domot se presenta (domot = “domus" + "robot" como el tercer inquilino activo del edificio, coexistiendo con los usuarios y administradores siendo capaz de manejar recursos estando a disposición del otro usuario. El sistema se basa en la definición de dos tipos de modelo de estructura, que se utilizarán como referencia para las partes de hardware y software del sistema. El modelo de referencia de la parte software se basa en una red distribuida heterogénea de puestos de trabajo, ejecutando un conjunto de procesos en que la comunicación entre ellos es basada en el paradigma del cliente-servidor. El modelo de referencia de la parte hardware se basa en una estructura con dos niveles de redes; el primero se utiliza para la comunicación entre los puestos de trabajo de alto nivel (destinados a la supervisión y monitorización y el segundo estará destinado a garantizar la comunicación entre los controladores de bajo nivel. Estos dos tipos de modelos constituyen la base para una implementación robusta y abierta de una infraestructura que pueda ser utilizada para las actividades económicas y también para los deseos de usuarios individuales, permitiendo progresos sinérgicos. La interfaz de usuario, que se puede utilizar en cualquier lugar del mundo en que esté disponible una conexión TCP-IP, está estructurada jerárquicamente; se proporcionan información y diálogos específicos para la monitorización y control de los diversos tipos de dispositivos y gestión de los mismos y sistemas que estén instalados en el edificio. Los sistemas ya integrados son: detección de intrusos, CCTV y PABX. El control de acceso, aire acondicionado y calefacción, iluminación se añadirán en un futuro próximo.

  5. Eficiencia energética y confort en edificios de oficina: El caso alemán

    Directory of Open Access Journals (Sweden)

    Ernesto Kuchen

    2012-12-01

    Full Text Available La construcción de edificios en los últimos 15 años en Europa persigue el objetivo común de dar respuesta al problema de la Eficiencia Energética y el Confort en espacios de trabajo. Las propuestas de cambio se inclinan por el desarrollo de una arquitectura “transparente”, con extensas superficies de vidrio expuestas. Dicha práctica se hace llamar ecológica y sustentable. Con el tiempo, el uso y la experiencia ponen en alerta a científicos del área. El objetivo del trabajo es detectar los aspectos más relevantes que afectan la Eficiencia Energética (EE y el Confort de espacios reales de trabajo para la elaboración apropiada de herramientas de diseño y cálculo. Para ello, se lleva a cabo un trabajo de campo en base a mediciones y encuestas en 19 edificios de oficina, en Alemania. Del monitoreo energético y del análisis del Confort se detectan potenciales de optimización. Se observa que la EE no se logra al conectar el edificio a la red energética una vez finalizada la obra arquitectónica. Por el contrario, la planificación integral, el monitoreo y el seguimiento en la vida útil del edificio permiten corregir y lograr mejores niveles de EE y Confort.

  6. Diagnosis and treatment for sick building; Diagnostico y tratamiento para edificios saludables

    Energy Technology Data Exchange (ETDEWEB)

    Perez, Maria M; Salomon, Jorge A; Lazcano, Alejandro S [Facultad de Ingenieria UADY, Merida Yucatan (Mexico)

    2000-07-01

    In recent years, the indoor air quality (IAQ) in work spaces have acquired special importance. Health symptoms refer to a productivity and economic loss. IAQ health symptoms associated with acute discomfort that improve while away from work. More common, however, are apparent outbreaks of illness within work spaces in which neither environmental causes non recognized diseases can be identified. Usually reported within the last years, these events are often called sick building syndrome. To determine a sick building diagnosis and treatment, it is necessary to plan methodology based on environment comfort, habitability, energy efficiency use and nature preservation. Hereby it is presented a methodology to determine a sick building diagnosis and treatment which was applied in Superior Court of Justice building (Tribunales Primero y Segundo del Decimocuarto Circuito del Poder Judicial de la Federacion), where employees have expressed diseases as sleepiness, cold and difficulty breathing. [Spanish] En los ultimos anos, la calidad del aire en el ambiente de trabajo ha adquirido especial interes debido a la importancia que representa para el bienestar, eficiencia y productividad de los empleados. Los edificios carentes de esa calidad del aire ocasionan trastornos de salud relacionados con la falta de confort que prevalece en el ambiente de trabajo, es comun encontrar en los empleados que alli laboran, brotes de sintomas como dolores de cabeza, letargo y resfriados, entre otros. Usualmente encontrados en los ultimos anos en ambientes de oficinas a estos sintomas se les llama sindrome del edificio enfermo. Para lograr el diagnostico y tratamiento de un edificio enfermo es necesario plantear una metodologia basada en criterios de confort ambiental, habitabilidad, uso eficiente de la energia y preservacion del medio ambiente. En este trabajo presentamos una metodologia para el diagnostico y tratamiento de edificios con ese sindrome y presentamos un estudio de casos de los

  7. Instalaciones del edificio de Costillares

    Directory of Open Access Journals (Sweden)

    Laorden, José

    1999-08-01

    Full Text Available Not available

    Se describen las instalaciones de calefacción y refrigeración, fontanería, gas, central eléctrica, iluminación, teléfonos y aislamiento térmico del edificio construido en Chamartín de la Rosa para sede del instituto Técnico de la Construcción y del Cemento, dando las consideraciones generales que sirvieron para proyectarlas y analizando después para cada una de ellas las bases del proyecto, su ejecución y, finalmente, los primeros resultados de su funcionamiento. De especial interés creemos los comentarios que hacemos sobre algunos errores de proyecto o de ejecución, con lo cual quizá se puedan evitar en otros trabajos.

  8. Aspectos particulares del diseño de muros

    Directory of Open Access Journals (Sweden)

    Calavera, J.

    1988-12-01

    Full Text Available This paper deals about the difference between designing some parts of the retaining walls, multiplicand the actual loads and active confinement pressures by the appropiate load factors (the correct and mandatory method and the obtaining the bearing pressures, and the design of those parts working with the bearing pressures obtained multiplicand the bearing pressures under service load conditions, by the load factor. The study shows the important difference between the results obtained by means of the two methods.

    A partir de la Instrucción EH-82, en el cálculo de los distintos elementos estructurales, lo que se ponderan por el coeficiente de seguridad y, no son los esfuerzos en dichos elementos, sino las acciones que dan lugar a ellos. Esta importante diferencia conceptual, en la mayoría de las estructuras que manejamos, no conduce a diferencias numéricas grandes entre los resultados obtenidos por uno u otro método. En el presente trabajo se muestra cómo en el caso de los muros, las diferencias son grandes y la variación del nivel de seguridad importante si se ponderan los esfuerzos y no las acciones.

  9. Evaluación de la demanda sísmica fuera del plano en edificios

    Directory of Open Access Journals (Sweden)

    Wilmer Julián Carrillo León

    2005-01-01

    Full Text Available En este trabajo se presentan los resultados de una investigación analítica y computacional, donde se propone una metodología para evaluar la demanda sísmica fuera del plano, en edificaciones de pórticos con rellenos de mampostería no reforzada. Con esta metodología se obtienen los registros de aceleración en diferentes alturas del edificio. Las ecuaciones propuestas se basan en los resultados obtenidos mediante metodologías establecidas a nivel mundial, datos registrados de una edificación construida en la ciudad de los Ángeles, la cual se encontraba completamente instrumentada durante el sismo de Northrigde – 1994; y modelos analíticos de edificios típicos analizados mediante el método de elementos finitos - FEM. Por último, se presentan curvas de aceleración respecto a la altura (utilizando la metodología propuesta para edificios típicos con sistema estructural de pórticos con mampostería no reforzada construidos para las diferentes zonas establecidas en la microzonificación sísmica de la ciudad de Bogotá

  10. Edificio Ince - Caracas (Venezuela

    Directory of Open Access Journals (Sweden)

    Sanabria, Tomás José

    1971-08-01

    Full Text Available This project includes a tall building, headquarters of the owning organisation, a four storey block, used for professional training purposes, and an auditorium. In addition there is underground space used as car park, and a small plaza with gardens, meant as an open air exhibition space for sculptures. The structure of the buildings is reinforced concrete, and the curtain walls are of anodizod aluminium.El conjunto comprende: el edificio torre, sede de la Institución; un bloque de cuatro plantas, destinado para centro de formación profesional, y un auditorio. Hay, además, un sótano, que alberga: el estacionamiento de vehículos y zonas de instalaciones diversas, y una plaza tratada paisajísticamente y destinada a exposición permanente de escultura al aire libre. Su estructura es de hormigón armado y los cerramientos son de aluminio anodizado.

  11. Enlace inalámbrico de dos edificios

    OpenAIRE

    MENDOZA JAENS, DAVID ALBERTO

    2015-01-01

    Debido a cambios propuestos por el Gobierno actual, el Gerente General del Banco Central del Ecuador, reubicó personal que laboraba en las oficinas ubicadas en el edificio principal ubicado en 9 de Octubre 200 y Pichincha, donde el departamento de Recuperación y Liquidación de la Banca Cerrada Guayaquil cumplía sus funciones. Ante este requerimiento, se le solicitó al personal de Ingeniería de Sistemas y Comunicaciones dar la solución técnica que mantenga el nivel de servicio de los funcionar...

  12. Prácticas en empresa de rehabilitación, restauración y mantenimiento de edificios

    OpenAIRE

    Muelas Moreno, Marcos

    2012-01-01

    Después de haber realizado siete meses de prácticas como encargado de obra en 4ARK, una constructora de rehabilitación de edificios de Barcelona, he querido recoger en este trabajo las patologías más frecuentes que nos encontramos cuando rehabilitamos un edificio o alguna parte del mismo (cubiertas, fachadas, estructura y bajantes). También se ha analizado que trabajos son los que se suele tener problemas y causan retrasos, ocasionando la suma de todos ellos, el no cumplimiento...

  13. Empleo del penetrómetro para madera para el diagnóstico de la madera en servicio en edificios antiguos

    Directory of Open Access Journals (Sweden)

    Palaia, L.

    2014-03-01

    Full Text Available Instrumental technique applied in situ allows researchers to save time on diagnosis and minimize damage to the sound timber. Pilodyn testing may be a useful method of diagnosis of these structures. The case study is about an urban 19th century building in an historic area of Valencia, located very close to the original city foundation area. The building has brick bearing load walls, timber floors and a roof structure. A simplified diagnosis method of timber structures was performed: visual inspection carried out by qualified site surveyors using SDT, in this case the wood probing (Pilodyn. This method proved to be adequate to determine parameters and to obtain conclusions of the mechanical characteristics of the structural elements. A standardization proposal to use this instrumental may be developed in the future.Las técnicas instrumentales para ensayos in situ permiten a los expertos ahorrar tiempo en el diagnóstico y minimizar el daño que se produce en algunos casos a la madera sana, empleando técnicas tradicionales de diagnóstico. El empleo del Pilodyn para ensayos de penetración puede constituir un «método rápido» de diagnóstico de estas estructuras. Se presenta un caso de estudio de un edificio del siglo XIX construido en el centro histórico de Valencia. Los muros son de ladrillo y la estructura horizontal así como de la cubierta son de madera. Se ha realizado un método de diagnosis simplificado: inspección visual de la estructura y ensayos con Pilodyn. Este método resultó adecuado para determinar parámetros acerca de sus cualidades resistentes, abriendo una vía hacia una posible propuesta de normalización para el empleo de este instrumento.

  14. A DISPLACEMENT-BASED DESIGN METHOD FOR MEDIUM-RISE REINFORCED CONCRETE WALLS

    Directory of Open Access Journals (Sweden)

    HECTOR URREGO

    2010-01-01

    Full Text Available En los métodos de diseño basado en desplazamientos normalmente se hacen consideraciones de demanda a partir del primer modo de vibrar, sin embargo algunos autores han llamado la atención sobre la importancia de considerar los modos superiores ya que estos influyen en la distribución y en la demanda tanto de momentos como de cortantes a lo largo de los elementos verticales con efectos importantes. En este trabajo, se presenta un método práctico que permite considerar el efecto de los modos superiores sobre la respuesta sísmica de una estructura. Para ello, se propone un modelo simplificado de tres grados de libertad, desarrollado a partir de la concentración de las masas en cuatro puntos igualmente espaciados en la altura del edificio. El método desarrollado corresponde a un proceso iterativo, en el cual los procedimientos de análisis y diseño se realizan de manera simultánea, evitando hacer consideraciones o supuestos sobre valores de resistencia y ductilidad. El método ha sido aplicado a un edificio de muros estructurales de 15 niveles. Los resultados obtenidos muestran la eficiencia del método en términos del cumplimiento de los objetivos propuestos y la rapidez con que converge el proceso iterativo involucrado. El efecto de los modos superiores es altamente notorio en la distribución de esfuerzos cortantes y el uso de un predimensionamiento inicial que involucra el refuerzo, permite una consistencia entre el análisis y el diseño estructural.

  15. Edificio para la Libbey-Owens-Ford Glass Company

    Directory of Open Access Journals (Sweden)

    Skidmore, Owings & Merrill, Arquitectos

    1965-04-01

    Full Text Available This is a 15 storey building, located in Toledo, Ohio, and will house the general offices of the Libbey-Owens-Ford Company. There is a basement, which contains air conditioning equipment, stores, service rooms, and similar facilities. The ground floor occupies a smaller area than the floors above, and the difference in area provides a covered arcade round the building. The main hall and lift shafts take up most of the ground floor space. All the remaining storeys are devoted to offices. This is a good example of contemporary functional architecture and also an exciting manifestation of the use of glass in this type of buildings.Este edificio, de 15 plantas de altura, construido en Toledo, Ohio, para oficinas generales de la Libbey-Owens- Ford Glass Company, consta de: un sótano destinado a albergar los equipos mecánicos para el acondicionamiento de aire, etc., almacén, departamentos de servicio, etc. El cuerpo de edificación de la planta baja, que aparece retranqueado de los soportes perimetrales creando una zona porticada, aloja el vestíbulo principal, núcleo de comunicaciones verticales, etcétera. Las restantes plantas están ocupadas por oficinas. No solamente este edificio es un destacado ejemplo de arquitectura moderna, sino que también es una suscitante manifestación de las ideas arquitectónicas en cristal.

  16. Edificio Playa, en la Costa del Sol

    Directory of Open Access Journals (Sweden)

    Cassinello, Fernando

    1964-02-01

    Full Text Available This apartment block has been built on the Costa del Sol, in Almeria, only a few metres from the seashore. It is meant to provide the following facilities. Changing rooms for bathers, and a night club, in the basement. Restaurant and bar on the ground floor. Twelve living apartments on the six standard floor levels; two apartments per storey. Porter's house in the attic. As the foundations are in the sand, and the building is exposed to strong coastal winds, the structural design has, as interesting features, the foundation ribbed slab and the transversal portal frames, which are W shaped on the ground level. This arrangement makes the edifice look lighter and it acquires a more dynamic plasticity.En la Costa del Sol de Almería y a muy pocos metros de la orilla del mar, se ha construido este edificio de apartamentos. Su programa es el siguiente: casetas de baño y sala de fiestas, en sótano; restaurante-bar, en planta baja; doce viviendas, en las seis plantas tipo, con dos viviendas por planta; y vivienda del portero en ático. Cimentado sobre arena y expuesto a los fuertes vientos que azotan la costa, la solución estructural ofrece el interés de su tipo de cimentación por placa nervada, y de sus pórticos transversales que en planta baja adoptan forma de W, con lo que el edificio adquiere un aspecto de mayor ligereza y de dinamismo plástico.

  17. Construction components and energy efficiency in buildings; Componentes de construccion y eficiencia energetica en edificios

    Energy Technology Data Exchange (ETDEWEB)

    Bansal, N.K.; Bhandari, M.S.; Kummar, P.S. [Centro para el Estudio de Energia, Instituto Hindu de Tecnologia, Hauz Khas, Nueva Delhi (Indonesia)

    2005-01-15

    An energy efficiency analysis to a set of buildings was made in India to quantify the effects of the individual design concepts with respect to the energy system in general. The saving potential of energy of different concepts as well as the orientation, windows, air cavities, insulation, etc. was quantified for the different climatic conditions that prevail in most of the Central India regions. It is demonstrated that the specific requirement of heat energy can be reduced to 300 kWh/m{sup 2} a (U{sub edifice} = 2.13 W/m{sup 2} K) for a building of normal construction up to 143 kWh/m{sup 2} a (U{sub edifice} = 0.95 W/m{sup 2} K) when using ceiling insulation and walls and by means of the use of double glass windows. [Spanish] Se realizo el analisis de eficiencia de energia a un conjunto de edificios en la India, para cuantificar los efectos de los conceptos individuales de diseno respecto al sistema de energia en general. El potencial de ahorro de energia de distintos conceptos, como la orientacion, ventanas, cavidades de aire, aislamiento, etc. fue cuantificado para las distintas condiciones climaticas que prevalecen en la mayoria de las regiones de India central. Se demuestra que el requerimiento especifico de energia calorifica puede ser reducida de 300 kWh/m{sup 2} a (U{sub edificio} = 2.13 W/m{sup 2} K) para un edificio de construccion normal hasta 143 kWh/m{sup 2} a (U{sub edificio} = 0.95 W/m{sup 2} K) al usar un aislante en el techo, paredes y mediante el empleo de ventanas de doble vidrio.

  18. Análisis del comportamiento a flexión de muros de adobe reforzados con geomallas

    Directory of Open Access Journals (Sweden)

    Solís, M.

    2015-09-01

    Full Text Available Rammed earth is a widely used building material in many regions of the world. Due to the high seismic risk in those areas, earthen constructions require suitable and efficient reinforcement techniques from a technological and socioeconomic point of view. This paper analyzes the bending behavior of geogrid reinforced adobe walls from an experimental and analytical point of view. The experimental bending moment-curvature relationships are analytically approached. The results show how geogrid reinforcement improves the performance of adobe masonry in terms of strength and ductility. Thus, a better seismic performance is achieved.La tierra cruda constituye el material de construcción más importante en muchas regiones del planeta. Dado el riesgo sísmico existente en la mayor parte de estas regiones, es necesario el desarrollo de técnicas de refuerzo eficaces y adecuadas desde un punto de vista tecnológico y socioeconómico. Este artículo analiza desde un punto experimental y analítico el comportamiento a flexión de muros de adobe reforzados con geomallas. Las leyes momento-curvatura de los muros ensayados son aproximadas mediante una serie de modelos analíticos que permiten analizar el comportamiento del material compuesto adobe-geomalla. Los resultados obtenidos muestran como la geomalla mejora el comportamiento de la mampostería de adobe en términos de resistencia y ductilidad, mejorando así su comportamiento en caso de movimiento sísmico.

  19. Design for a prototype walls monolitic sustainable housing / Diseño de muros mololítico para un prototipo de vivienda sustentable

    Directory of Open Access Journals (Sweden)

    Yolanda Guadalupe Aranda Jimenez

    2014-09-01

    Full Text Available Currently, pouredearthis proposed asa potential alternative forhousingin certainregions of the stateofTamaulipas, Mexico. Thepurpose of this paperis to findthe percentage ofCPO20cementrequired to obtainthecompressive strengthfor poured earthto work itasload bearing wall. Mixes of two soils were made in the city of Tampico, Tamaulipas and stabilized with cement in several proportions. Afterwards, the thickness that the wall should have was calculated to sustain a slab, whose constructive system is bamboocrete, supported in two ways. It was found that the addition of 6% of cement is acceptable for a wall of 25 cm of thickness whose bearing capacity isof 17,787 kg to sustain the slab proposed of bamboocrete. Actualmente, la tierra vertida se propone como una alternativa potencial para la construcción de viviendas en ciertas regiones del estado de Tamaulipas, México. El objetivo del presente trabajo es proponer el porcentaje de cemento CPO 20 requerido para obtener la resistencia a la compresión de la tierra vertida para ser empleado como muro de carga. Se realizaron mezclas de dos suelos de la ciudad de Tampico, Tamaulipas y se estabilizaron con cemento a diversas proporciones. Los suelos fueron caracterizados y a las mezclas se determinó su resistencia a la compresión; posteriormente se calculó el espesor que debería tener el muro para soportar una losa cuyo sistema constructivo es bambucreto, apoyada en 2 sentidos. Se encontró que es aceptable adicionar 6% de cemento para un muro de 25cm de espesor cuya capacidad de carga es 17,787 kg para soportar una losa propuesta de bambucreto.

  20. Edificio de oficinas en el paseo de recoletos. Madrid/España

    Directory of Open Access Journals (Sweden)

    Andrada Pfeiffer, R.

    1988-02-01

    Full Text Available The projected building is an attempt to respond to the problems resulting from the construction of a modern office building in a significant, characteristic and consolidated urban environment of Madrid. Among the problems considered by the authors are their relationship with the existing medium-sized buildings, as well as location (the corner of a consolidated block on the avenue-axis Castellana-Recoletos, arquitectonic language (composition of façades, and construction and construction materials (stone and glass. Therefore, the building is conceived from a plan of necessities (offices set in "landscape floors", and as an expression of its urban location, in an area whose uniqueness and importance themselves have suggested the shapes, the materials and their expression.

    El proyecto intentó dar respuesta a los problemas que plantea la construcción de un edificio moderno de oficinas en un entorno urbano muy significativo, característico y consolidado de Madrid. Se han valorado tanto los problemas de enlace con los edificios medianeros, como los problemas de situación (esquina de una manzana consolidada en el paseo o eje Castellana-Recoletos, los problemas de lenguaje arquitectónico (composición de las fachadas y los de su construcción y sus materiales (piedra y cristal. Por tanto, se concibe el edificio a partir del programa de necesidades (oficinas en "planta paisaje", como expresión de su situación urbana, en un entorno cuya singularidad e importancia, han ido sugiriendo las formas, los materiales y su expresión.

  1. Una obra maestra de la escultura gótica italiana: el Crucificado de Santa María de Muros (A Coruña

    Directory of Open Access Journals (Sweden)

    Singul, Francisco

    2011-12-01

    Full Text Available The monumental gothic crucifix of Santa María del Camino (Muros represents the major known work of tuscany XIVth century wood sculpture. In this paper the piece and its context –in Italy and Galicia-, the master style and iconographical aspects are analized. Late medieval foreign trade between Galicia and Italy as well as the import of mediterranean works of art are also considered.

    El monumental Crucificado gótico de Santa María del Camino (Muros es la más importante representación conocida de la escultura toscana, en madera policromada, del siglo XIV. En este artículo se analizan la pieza y su contexto –en Italia y en Galicia-, el estilo del maestro y la iconografía. De igual modo también se tratan aspectos como el comercio bajomedieval entre Galicia e Italia, así como la importación de obras de arte del Mediterráneo.

  2. Edificio de 14 viviendas y garajes en Cartagena

    OpenAIRE

    Navarro Serrano, Antonio

    2015-01-01

    Se trata de la construcción de un bloque de viviendas con forma de “U” donde en este proyecto se ocupara de realizar uno de los tres bloque del mismo. Este bloque engloba la construcción de 14 viviendas con aparcamiento y trasteros, ubicado en la ciudad de Cartagena. El edificio proyectado corresponde a la tipología de vivienda plurifamiliar en bloque en “U” (manzana abierta). Constará de una planta sótano común para todo el bloque, cuatro plantas de viviendas y una de trastero...

  3. El edificio como un sistema de gestión de información

    Directory of Open Access Journals (Sweden)

    Triviño Barros, Gracián

    2003-12-01

    Full Text Available The current state of development of the technologies of information and communications is modifying the way the project of designing, executing and maintaining a Building must face. On the one hand during the Building cycle of live it is generated an important amount of information that is managed by different people or different teams. The responsibility of these people starts and ends with the different project phases. On the other hand the knowledge required to describe and manage properly a medium size building system is sp read in an important number of technological and scientific disciplines. Because the current level of development of these technologies this knowledge management must be shared out between different specialists. In this situation building management will overtake managers human capabilities if they are not provided with the adequate computer based tools.El desarrollo de las tecnologías de tratamiento de información y las telecomunicaciones está modificando la forma más adecuada de enfrentarse al proyecto de diseño. construcción y explotación de un Edificio. Por un lado a lo largo del ciclo de vida de un Edificio se genera y debe gestionarse una gran cantidad de información cuya gestión corresponde a diferentes personas o grupos de trabajo cuya responsabilidad empieza y termina según se van sucediendo las diferentes fases de proyecto. Por otro lado los conocimientos necesarios para describir y gestiona r con eficacia el sistema constituido por un edificio de mediana complejidad están dispersos en un amplio número de disciplinas tecnológicas y científicas. Debido al desarrollo actual de las distintas tecnologías la gestión de estos conocimientos debe ser realizada por personal especializado. En esta situación la gestión óptima del edificio como un sistema integrado está asociada con la gestión de un sistema de información cuya complejidad frecuentemente desbordará la capacidad de las personas

  4. Edificio del Congreso Bad-Gastein – Austria

    Directory of Open Access Journals (Sweden)

    Garstenauer, G.

    1975-06-01

    Full Text Available One of the most outstanding characteristics of this Congress Centre is its great adaptation to the hilly ground on which it is situated occupying a very small area and having successfully solved the problem of a difference of elevation of 50%. The entrance to the building is on the top floor, placed at the level of the street that limits the plot in its highest section. On this floor, which is covered by a transitable terrace, are the various offices and premises for the use of the congress members. Below the entrance level is the technical floor which holds all the installations of the building and immediately below this floor is the great congress hall in two levels and with a varying capacity of 800 to 1,500 persons. Finally, two storeys, situated in the lowest part of the building, are reserved for storage rooms, and garages. The construction has almost entirely been carried out by means of prefabricated members, out of which the most important ones are: columns with square cross-section, with big supporting heads that support an approximate load of 2,000 t; the girder in the shape of an inverted T; and the double ceilings of prefabricated plates which by means of concrete foundations rest upon the caisson ceiling in squares of double web girders.Una de las características más sobresalientes de este Centro de Congresos es su gran adaptación al accidentado terreno en el que se encuentra enclavado, de superficie muy reducida y con un desnivel que supera el 50%. El acceso al edificio se efectúa por la planta superior, situada a nivel de la calle que limita la parcela en su parte más alta. En esta planta, cubierta por una terraza transitable, se han dispuesto diversas oficinas y locales para uso de los congresistas. Por debajo del nivel de entrada se encuentra la planta técnica, que agrupa todas las instalaciones del edificio, e inmediatamente debajo de ella, el gran salón de congresos, en dos niveles y con capacidad variable

  5. Reforma de edificios antiguos. El rasgado de huecos en muros de carga

    OpenAIRE

    Soto Pardo, M.

    1985-01-01

    Forming openings in load-bearing brickwork is a very frequent operation when reforming old buildings. A correct solution requires the supporting structure, usually a steel portal frame, to be loaded by means of hydraulic jacks or some similar system. This step is normally omitted which gives rise to two different problems. Fistly, a delayed loosening of the unsupported area occurs and alarming cracks appear. Secondly and much more dangerous though not so apparent, is the overloading of certai...

  6. Acción colectiva de jóvenes en Manizales: colectivo muros libres, acciones de muralismo urbano

    OpenAIRE

    Franco Jaramillo, Paula Milena

    2017-01-01

    Tesis (Maestría en Educación y Desarrollo Humano). Universidad de Manizales. Facultad de Ciencias Sociales y Humanas. CINDE, 2016 “Acción colectiva de jóvenes en Manizales: colectivo muros libres, acciones de muralismo urbano”, es un trabajo de investigación surgida en el marco de la Convocatoria 543 de COLCIENCIAS Tema "Consolidación de la Democracia, la Paz y la Reconciliación”; específicamente hace parte del proyecto Colciencias “Acción Colectiva de jóvenes en Bogotá”, di...

  7. La refrigeracion nocturna en edificios de oficinas optimizacion del sistema mecanico

    NARCIS (Netherlands)

    Lain, M.; Hensen, J.L.M.

    2007-01-01

    En muchas ocasiones se ha tratado sobre la necesidad de optimizar el sistema mecánico nocturno de refrigeración. En este documento se trata de la utilización de simulaciones por ordenador tanto para el apoyo al diseño de un edificio nuevo y desarrollo de un sistema HVAC, como para la optimización de

  8. Metodología y herramienta VERDE para la evaluación de la sostenibilidad en edificios

    Directory of Open Access Journals (Sweden)

    Macías, M.

    2010-03-01

    produce la operación del edificio y la fabricación de los materiales de construcción sobre el medioambiente natural. Durante esta misma década los problemas de la pobre calidad del aire interior y la inadecuada ventilación en edificios herméticos (síndrome del edificio enfermo constituyen una preocupación creciente en los ciudadanos. Gradualmente ha habido un incremento en el consenso en relación con el tipo impactos que deben incluirse en un modelo de evaluación verde. Desde el año 2000, el número de métodos para la evaluación medioambiental de edificios en el mundo se ha multiplicado considerablemente. BREEAM (BRE Environmental Assessment Method fue el primer sistema (aparecido en 1990 que ofreció un método de etiquetado de edificios aunque LEED (Leadership in Energy and Environmental Design es el de mayor implantación en el mercado de grandes edificios. Actualmente existe un gran número de modelos, muchos de ellos basados en la metodología desarrollada por el grupo GBC (Green Building Challenge, actualmente iiSBE (International Initiative for a Sustainable Built Environment. En este trabajo se presenta una nueva metodología y un modelo de evaluación de la sostenibilidad de edificios denominado VERDE, basado en la cuantificación de la reducción de impactos.

  9. Edificio en terraza - Viena (Austria

    Directory of Open Access Journals (Sweden)

    Wörle, E.

    1972-03-01

    Full Text Available This building is located on the side of a hill, at Modling, hence the curious stepped up arrangement of the design, to adapt itself to the nature of the site. There are 30 dwellings whose useful areas vary between 80 and 150 m2, and additionally 5 apartments of 50 to 85 m2. Each has its own terrace and artificial garden, also parking space. The general style is sober, both inside and in its external aspect.El conjunto está situado en la ladera de un monte cuajado de flores amarillas, en Modling, adoptando esta curiosa forma escalonada en función de la fisonomía del solar elegido. Hay un total de treinta viviendas con superficies útiles de 80 a 150 m2; cinco apartamentos de 50 a 75 m2 útiles, cada uno, con su correspondiente terraza ajardinada, garaje y aparcamiento, además de otros edificios similares, todos ellos tratados con gran dignidad interior y exterior.

  10. Pleiotropic roles of Clostridium difficile sin locus

    Science.gov (United States)

    Ou, Junjun; Dupuy, Bruno

    2018-01-01

    Clostridium difficile is the primary cause of nosocomial diarrhea and pseudomembranous colitis. It produces dormant spores, which serve as an infectious vehicle responsible for transmission of the disease and persistence of the organism in the environment. In Bacillus subtilis, the sin locus coding SinR (113 aa) and SinI (57 aa) is responsible for sporulation inhibition. In B. subtilis, SinR mainly acts as a repressor of its target genes to control sporulation, biofilm formation, and autolysis. SinI is an inhibitor of SinR, so their interaction determines whether SinR can inhibit its target gene expression. The C. difficile genome carries two sinR homologs in the operon that we named sinR and sinR’, coding for SinR (112 aa) and SinR’ (105 aa), respectively. In this study, we constructed and characterized sin locus mutants in two different C. difficile strains R20291 and JIR8094, to decipher the locus’s role in C. difficile physiology. Transcriptome analysis of the sinRR’ mutants revealed their pleiotropic roles in controlling several pathways including sporulation, toxin production, and motility in C. difficile. Through various genetic and biochemical experiments, we have shown that SinR can regulate transcription of key regulators in these pathways, which includes sigD, spo0A, and codY. We have found that SinR’ acts as an antagonist to SinR by blocking its repressor activity. Using a hamster model, we have also demonstrated that the sin locus is needed for successful C. difficile infection. This study reveals the sin locus as a central link that connects the gene regulatory networks of sporulation, toxin production, and motility; three key pathways that are important for C. difficile pathogenesis. PMID:29529083

  11. Religious celebration and artistic virtuosity in Los Sirgueros de la Virgen sin original pecado, by Francisco Bramón

    Directory of Open Access Journals (Sweden)

    Eduardo Francisco Hopkins Rodríguez

    2013-11-01

    Full Text Available Abstract:This article tries to deepen into the rhetoric, theological and autobiographic mechanisms that lie under Los Sirgueros de la Virgen sin original pecado by Francisco Bramón (1620. A divine pastoral romance conceived to celebrate the Immaculate Conception of Mary, dogma still under debate during the XVIIth Century, but with a strong support among the Spaniards, both in Spain and its American colonies. An opportunity that Bramón grabbed not only to honor the Immaculate, but also to denounce the poor conditions that suffer authors in the New Spain through a complex erudition structure. Resumen:Este artículo intenta profundizar en los mecanismos retóricos, teológicos y autobiográfico que están detrás de Los Sirgueros de la Virgen sin original pecado de Francisco Bramón (1620. Una novela pastoril a lo divino concebida para celebrar la Inmaculada Concepción de María, dogma aún en debate en el siglo XVII, pero con una fuerte devoción entre los españoles, tanto en España como en sus colonias americanas. Una oportunidad que Bramón aprovechó no solo para honrar a la Inmaculada, sino también para denunciar las condiciones precarias de los autores en la Nueva España a través de un complejo edificio de erudición.

  12. Edificio de servicios múltiples Valladolid/España

    Directory of Open Access Journals (Sweden)

    Méndez, Eduardo

    1983-05-01

    Full Text Available From the modules of the Coordinating Committee of administrative buildings, established in accord with requirements of space of the different jobs, this building has been constructed to globalize the numerous dependencies of various Ministries and Institutes. In essence, the construction is composed of two cellar levels for parking and services; a lower floor for the cafeteria and meeting hall; two upper floors for offices, connected with the nucleous of vertical communications. For the structure, as likewise for the dimensioning of the jobs and the windows and even the paving of the false ceiling, the basic module was 1.25 x 1.25 metresA partir de los módulos de la Junta Coordinadora de edificios administrativos, establecidos en función de las necesidades de espacio de los distintos puestos de trabaja se ha realizado este edificio que engloba las numerosas dependencias de varios Ministerios e Institutos. En esencia la construcción se compone de dos niveles de sótano para aparcamiento y servicios; una planta baja destinada a cafetería y salón de actos; dos cuerpos elevados, destinados a oficinas, enlazados por el núcleo de comunicaciones verticales. Para la estructura, así como para el dimensionamiento de los puestos de trabajo y de los huecos de ventana, e inclusa del despiece del pavimento y del falso techo, se ha partido de un módulo base de 1,25 X 1,25 metros.

  13. Análisis estructural del campus de oficinas de Repsol, Rafael de La-Hoz

    OpenAIRE

    López-Cortijo Martín, Cristina

    2016-01-01

    62 p. Campus Repsol es un edificio que sirve como sede central de la empresa petrolera Repsol, ubicado en la calle de Méndez Álvaro 44, en Madrid, España. Nace de la necesidad de agrupar a los trabajadores de Repsol, repartidos hasta el momento en doce edificios de Madrid, facilitando la comunicación y disfrutando de un entorno natural y funcional sin renunciar a las comodidades de la gran ciudad. El edificio fue diseñado por el arquitecto Rafael de La-Hoz,...

  14. Predicción de demanda eléctrica en edificios

    OpenAIRE

    Ollé López, Guillem

    2015-01-01

    La finalidad del presente proyecto consiste en exponer una serie de herramientas basadas en nuevas tecnologías computacionales para la predicción de la demanda eléctrico en edificios. Estas nuevas tecnologías computacionales se denominan redes neuronales artificiales y se basan en algoritmos muy potentes para relacionar grandes cantidades de información y, de esta manera construir modelos matemáticos muy complejos que puedan, en este caso, predecir valores. Para poder tene...

  15. Protecciones solares y su implicancia en la demanda energética: caso edificio público en Concepción, Chile

    OpenAIRE

    Jazmín Jara Córdova

    2015-01-01

    Determinar las ganancias solares en el vano-ventana con protecciones solares y analizar el comportamiento térmico en un edificio es un tema relativamente nuevo en el ámbito chileno. No obstante, el inadecuado manejo del control solar, en algunos casos, genera problemas de sobrecalentamiento al interior de la edificación. Esta investigación busca establecer un procedimiento que permita evaluar cuatro tipos de protecciones solares y analizar sus implicancias energéticas en un edificio público, ...

  16. Emisiones contaminantes de materiales de construcción en el interior de los edificios. Caso de los tableros de yeso

    OpenAIRE

    Silverio Hernández Moreno

    2007-01-01

    Se presenta una evaluación deemisiones contaminantes de materiales deconstrucción de edificios, específicamente demateriales que se instalan en su interior y queoriginan problemas de salud a corto, medianoy largo plazos a los usuarios debido a lassustancias químicas que emiten. Se presentaun caso de estudio experimental en donde seevalúan los tableros de yeso que normalmenteson instalados dentro de los edificios paramuros divisorios y falsos plafones. Se parte dela base experimental de un esp...

  17. Edificio Municipal, en Glendale, (U.S.A.

    Directory of Open Access Journals (Sweden)

    Martin, Albert C.

    1968-05-01

    Full Text Available This building has a basement, a diaphanous ground floor, and three storeys, which are occupied by various municipal departments, such as housing, security, engineering, planning, urbanism, and general management. The structure is highly original and functional, and these features make it a building of singular and striking appearance.Consta de: sótano; planta baja, proyectada con una gran diafanidad; y tres plantas de altura, que alojan los diversos departamentos de: Edificación, Seguridad, Ingeniería, Planificación, Zonifícación. Administración, etc., del Ayuntamiento de Glendale. La originalidad de su estructura, y su eminente funcionalidad, son características específicas de este edificio singular y de gran prestancia arquitectónica.

  18. Personas sin hogar y discapacidad

    Directory of Open Access Journals (Sweden)

    Sonia Panadero Herrero

    2014-12-01

    Full Text Available Este artículo presenta los principales resultados del primer trabajo de investigación específico sobre personas sin hogar y discapacidad llevado a cabo en España.  Dicho estudio se llevó a cabo en dos fases secuenciales. La Fase 1 perseguía cuantificar la existencia de discapacidad entre el colectivo de personas sin hogar para, en la Fase 2, profundizar en la situación de estas personas. Los resultados de la Fase 1, en la que se recogió información sobre 695 personas, mostraron una importante presencia de discapacidad entre las personas sin hogar.  Un 12 % de las personas sin hogar tenía certificado de discapacidad, aunque el porcentaje de discapacidad podría ser muy superior si se considera la percepción de profesionales y usuarios (al menos el 23 %. Los resultados de la Fase 2, en la que se comparaba la situación y características de las personas sin hogar con (81 participantes y sin ella (48 participantes, apuntaron importantes implicaciones de la existencia de la discapacidad entre las personas sin hogar, como una mayor cronificación de la propia situación, mayores dificultades de acceso al empleo, mayor vulnerabilidad a accidentes y agresiones y otros delitos.

  19. Anatomía y fisiología de la edificación: una manera de entender los edificios para su diseño y construcción

    OpenAIRE

    Escorcia Oyola, Olavo

    2008-01-01

    El documento está dividido en tres partes, la primera se dedica a establecer el contexto y las exigencias que hacemos al hábitat construido –internas de un edificio- como contraste a lo que nos brinda el hábitat natural –externas al edificio- discriminándolas en exigencias de habitabilidad y económicas. La segunda parte y propuesta fundamental de este ensayo, se concentra en entender y explicar el edificio como un “organismo arquitectónico” cuyos sistemas constitutivos responden sistémicament...

  20. Estabilización de taludes en el río Portoviejo, Ecuador

    OpenAIRE

    Roberto Watson-Quesada; Roberto Blanco-Torrens; Miguel Á. Chavez-Moncayo

    2008-01-01

    El río Portoviejo se encuentra en la ciudad homónima de la provincia Manabí, Ecuador. Los cambios ocurridos en el cauce del río y la construcción de obras de urbanización sobre una de sus márgenes han originado un talud inestable, proclive a la ocurrencia de deslizamientos y desprendimientos que ocasionan daños a las construcciones. Algunas técnicas de estabilización (muros de hormigón, muros de gaviones, entre otras) han sido aplicadas sin éxito al ser finalmente destruidas por la propia acc...

  1. Edificio de archivos en Los Angeles

    Directory of Open Access Journals (Sweden)

    Neutra & Alexander, Arquitectos

    1963-07-01

    Full Text Available The 80th birthday of Richard Neutra coincides with the completion of this building, a special feature of which is that it has 13 half-floor levels, thus saving space and making it easier to reach the documents. Besides housing the Territorial Archives Office, it accommodates the Territorial Testing Dept., Regional Planning Committee and Territorial Library. 40 ms high rotary sun shields are fitted, made of aluminium. They are controlled automatically by electronic devices, motivated by the solar action, and are thus correctly orientated at any time to provide protection against sun glare. They close altogether when the wind speed is such that they might be damaged. On the main facade looking towards Temple Street, the plastic arts organisation has contributed a large mosaic by Joseph Young, showing a map of the district. This archives building in Los Angeles is a fine exponent of what technology can do for man, and it is a characteristic example of contemporary organic architecture at its best.El principio de la octava década de Neutra coincide con la terminación del edificio, cuya sección nos ofrece trece medias plantas, para economizar espacio y facilitar el alcance de los documentos. Aloja, además de la Oficina Territorial de Archivos, otras varias: Departamento Territorial de Pruebas, Comisión de Planificación Regional y Biblioteca Territorial. Unos «brise-soleils» giratorios, de aluminio, de 40 m de altura, que funcionan automáticamente —controlados por un cerebro electrónico— bajo la acción solar, proporcionan la orientación «adecuada» en cada momento y protegen del brillo lateral, cerrándose cuando el viento sopla con una velocidad que puede serles perjudicial. Como aportación de las Artes Plásticas aparece en la fachada principal, que da a la calle Temple, un gran mosaico, de Joseph Young, del mapa del territorio. Este edificio de archivos en Los Angeles constituye un claro exponente en el que la, técnica est

  2. El tiempo equivalente de exposición al fuego en un edificio histórico

    Directory of Open Access Journals (Sweden)

    Orta, Belén

    2010-12-01

    ño, la ventilación, el material estructural, las medidas activas de lucha contra el fuego, etc.. En la mayor parte de los proyectos se optará por la primera vía, sin embargo cuando se trate de un edificio que por su singularidad requiera un análisis más pormenorizado, se recurrirá a la segunda. Este artículo expone la dificultad de aplicar el método del tiempo equivalente en base al CTE sin consultar el Eurocódigo-1 (EC-1 o manuales técnicos. Se expone hasta dónde llega la norma española y cuando hay que acudir a la europea. Se aplica el método a un ejemplo concreto, un espacio en dos alturas con un hueco horizontal en cubierta. Además se muestra como el método del tiempo equivalente, como alternativa, puede generar una serie de resultados con una amplia dispersión de valores obtenidos a partir de la cantidad de decisiones que la normativa permite en función de unos criterios que no son rígidos. Esta diversidad de resultados puede dejar perplejo al calculista no docto en el asunto. Para finalizar se extraen conclusiones sobre los valores obtenidos y se reflexiona sobre la aplicación del método y la responsabilidad del técnico.

  3. Paco Rabanne: ¿Arquitecto sin arquitecura?

    Directory of Open Access Journals (Sweden)

    Marta Muñoz Martín

    2017-07-01

    Full Text Available La arquitectura y la indumentaria son disciplinas aparentemente antagónicas, pero a lo largo de la historia podemos observar como los arquitectos han escrito sobre moda, han realizado edificios al servicio de ésta o incluso han diseñado vestidos y complementos. Del mismo modo, muchos modistos y diseñadores de moda han encontrado en la arquitectura una fuente de inspiración, han heredado sus instrumentos o han colaborado con sus figuras más reconocidas para la concepción de sus diseños. La figura de Paco Rabanne constituyó un nuevo paradigma en el diseño de moda. Formado como arquitecto en l’École de Beaux Art de Paris entre 1951 y 1963, en los años 60 aplicó sus conocimientos de arquitectura en la creación de vestidos rupturistas. Influenciado por las vanguardias artísticas de la época, así como por el uso de nuevos materiales y formas en la arquitectura del momento, su obra irrumpió en el panorama de los convulsos años 60, dinamitando la tradicional concepción de la moda e introduciendo materiales y técnicas ajenas a ésta pero propios de la construcción de edificios. Su carácter innovador contribuyó para establecer un paralelismo, hasta entonces poco desarrollado, entre ambas materias.

  4. Edificio Beatriz - Madrid – España

    Directory of Open Access Journals (Sweden)

    Población, E.

    1973-04-01

    Full Text Available This article describes the purpose, program and architectural plan, as well as the final design, system of construction, calculations and tests connected with this important office building, which has a finely evolved and modern style, and an interesting structure, affecting its five basements and ten floors above ground level.Se describen en el artículo los objetivos, programa, antecedentes arquitectónicos, solución adoptada, construcción, cálculo y ensayos que han sido precisos para realizar este importante edificio de oficinas, que une a su línea depurada de moderna factura una estructura muy interesante desde varios puntos de vista, desarrollada a lo ancho y a lo alto de sus cinco sótanos y sus diez plantas altas.

  5. Tres experimentos Modernos. El proceso de proyecto del edificio Positano

    Directory of Open Access Journals (Sweden)

    Juan Pablo Tuja

    2017-04-01

    Full Text Available El edificio Positano, proyectado durante la década de 1950 por el arquitecto Luis García Pardo, marca un hito en la arquitectura de la vivienda colectiva moderna en el Uruguay. Para concretar este edificio, el arquitecto -y promotor inmobiliario a la vez- desarrolló una serie de proyectos, identificándose tres proyectos completamente documentados. Esta serie posee un fuerte carácter moderno y experimental, el cual se expresa en la volumetría general, la implantación, en el desarrollo tipológico, el diseño estructural y el diseño de los cerramiento exteriores. El último proyecto, realizado en asociación con el joven arquitecto Adolfo Sommer Smith, comienza a construirse en 1959. La serie de proyectos, evidencia un creciente proceso de “abstracción”, tanto formal como conceptual. Lo cual conducirá por un lado a simplificar formas y reducir elementos, y por otro a diseñar dispositivos de mayor complejidad, capaces de resolver funciones diversas al mismo tiempo. A partir de la búsqueda y clasificación de documentación de época –planos, fotografías, artículos, entre otros–, el presente trabajo intentó ensayar una interpretación proyectual, exponiendo las principales preocupaciones y estrategias de los arquitectos. El ensayo buscó reconocer repeticiones, iteraciones, dudas y certezas de un proceso proyectual intenso, que transitó los bordes de la disciplina.

  6. Cruz azul y escudo azul, centro de servicio - Carolina del Norte – (EE. UU.

    Directory of Open Access Journals (Sweden)

    Odell, -

    1975-03-01

    Full Text Available This building is situated at the Chapel Hill-Durham road and contains the installations of two important merged insurance companies. The shape has not been chosen at random but is subject to certain conditions, such as protection from sun rays and strong winds. Neither should it be forgotten that this type of construction has a certain public relations mission to fulfill. Further, there was a great need for isolation from the noise of the traffic in the area. Metal structure, installations of all kinds and greatest consideration for the surrounding nature and the trees were dominant design factors.Este edificio está situado junto a la carretera Ciiapel Hill-Durliam y alberga las instalaciones de dos importantes compañías de seguros fusionadas. Su forma no es caprichosa, sino que obedece a motivaciones de tipo estructural, como protección de los rayos solares y de los vientos dominantes, sin olvidar la misión de reclamo publicitario que suele ser característica de este tipo de construcciones, así como lograr un cierto aislamiento del ruido que produce el tráfico rodado de la carretera próxima. Estructura metálica, cerramientos de muros - cortina, toda suerte de modernas instalaciones y máximo respeto del entorno natural y arbóreo existente.

  7. Edificio de viviendas residenciales, en Caracas (Venezuela

    Directory of Open Access Journals (Sweden)

    Beckhoff, P.

    1967-06-01

    Full Text Available This is a very well designed building, both in its internal distribution and inner and outer ornamentation. It has 12 storeys, and an outstanding feature of it is the exceptional landscaping of its terraces, and the very attractive aspect of the external elevations. There is every evidence of carefully and elaborate design, leading to a fine example of good taste and excellent architecture.Bien resuelto, desde el doble punto de vista de su distribución y ornatos exterior e interior, este edificio, de 12 plantas de altura, se distingue, además, por el tratamiento paisajístico de sus terrazas y por la composición estética de sus fachadas. Todo denota un cuidadoso y elaborado estudio, que ha conducido al logro de una muestra perfecta de buen gusto y de arquitectura ejemplar.

  8. Edificio para oficinas de Assicurazioni Generali

    Directory of Open Access Journals (Sweden)

    Alas, Genaro

    1964-02-01

    Full Text Available This building is on the Generalisimo Avenue, in Madrid. It is an office block made up of two wings and a central nucleus for vertical communications. The two bay floor levels have been planned to achieve the utmost flexibility in distribution, since there is no precise preconceived program of floor space distribution and future developments. The project is based on a 1.20 x 1.50 m modulus, which has been arrived at after detailed study. It has been obtained from a minimum space working unit, i. e., the surface that an employee will need. Each bay comprises nine 1.20 m modular units, and each floor level contains four service units, including ladies' and gentlemen's room and a cleaner's cubicle, fitted with waste disposal device. The building structure is reinforced concrete. The main facade has a striped steel facing, roll up aluminium Venetian blinds, with controllable elements, which provide good solar protection. This is a beautiful and well-coordinated building, which is worth a detailed study.Está situado en la avenida del Generalísimo en Madrid. Es un edificio destinado a oficinas, con dos cuerpos de doble crujía y un núcleo central de comunicaciones verticales. Las plantas han sido proyectadas pensando, siempre, en obtener la máxima flexibilidad, ya que, por no existir un programa enteramente definido, interesaba permitieran diferentes distribuciones y aprovechamientos futuros. El módulo de 1,20x1,50 m, base del proyecto, ha sido el resultado de un estudio detenido, partiendo de que la unidad mínima de trabajo está constituida por la superficie que ocupa un empleado. Cada crujía comprende nueve módulos de 1,20 m; y en cada piso se han organizado cuatro unidades de servicio, compuestas por un aseo de caballeros, uno de señoras y un cuarto de limpieza con vertedero. Su estructura es de hormigón armado, y en fachada principal aparece revestida con chapa, de acero banderizado, y antepechos corridos, de piedra Colmenar; persianas

  9. Vigilar sin castigar (Medios).

    OpenAIRE

    Ruiz Agila, Gabriela Alejandra

    2015-01-01

    Los imaginarios de las ciudades fronterizas se levantan sobre el mito de ciudades violentas sin historia. Los protagonistas no son otros que bandidos y extranjeros de paso. Siempre son ‘los foráneos’ los culpables. Y el conveniente juego de ‘vigilar sin castigar’ el contrabando y el tráfico de drogas que se repite cotidiano en vibrantes puntos de control como Rumichaca o Huaquillas.

  10. Privacidad vs eficiencia. El desdoblamiento de la superficie interior en los edificios de habitación colectiva en el Movimiento Moderno

    Directory of Open Access Journals (Sweden)

    Dr. Arq. Fernández Alejandro Pérez-Duarte

    2012-11-01

    Full Text Available Dentro de las principales estrategias del Movimiento Moderno aparece de forma insistente el llamado «planeamiento en sección»: células habitacionales encajadas dentro de edificios con pisos dislocados en vertical. Utilizando las palabras de Wells Coates, el apartamento tradicional –flat– evolucionó en modelos diferentes, con soluciones de más de un andar –not flat–. Las ventajas de esta estrategia fueron múltiples, desde una mayor eficiencia del espacio al disminuir las circulaciones colectivas hasta la minimización de la transmisión de ruidos entre apartamentos vecinos. Probablemente, el modelo más clásico es el de la Unité d’Habitation de Marseille (1947-1952 de Le Corbusier. Sin embargo, antes y después de éste, fueron construidos innúmeros ejemplares, particularmente en América, que mostraron geometrías aún más intrincadas y complejas. En este artículo de presentan varios de estos modelos con la idea que fue su base y se pone el foco en algunos casos publicados en revistas especializadas, de lo cual surge lo que podría llamarse una línea de trabajo.

  11. La técnica del tapial en la Comunidad Autónoma de Madrid. Aplicación de nuevos materiales para la consolidación de muros de tapia

    Directory of Open Access Journals (Sweden)

    Maldonado, L.

    1997-12-01

    Full Text Available The use of earth as a building material is spread in a great part of the architectural heritage of the Autonomous Community of Madrid, especially in the southern region, it appears in different usages and building methods like rammed earth, adobe or filled wood frame structures. The need of maintenance and preservation of this heritage justify the convenience of research on new techniques and materials applicable to restoration works. This paper aims to offer a view on the particularities of rammed earth (tapial, predominant in this region, and show the studies carried out on the architectural heritage as well as the targets, methodology and results of the research works developed to analyze the use of new products to consolidate rammed earth walls. The work has been carried out conjunctly by members of the Department of Construction of the Polytechnic University of Madrid and the ONGD Interaction.

    La Comunidad Autónoma de Madrid, especialmente en su mitad meridional, conserva un amplio patrimonio de edificios construidos con tierra, con ejemplos de distintas técnicas como la tapia, adobe o los entramados de madera rellenos. La necesidad de conservación y mantenimiento de este patrimonio justifica la conveniencia de investigaciones sobre nuevas técnicas y procedimientos constructivos aplicables en trabajos de restauración y rehabilitación. En este articulo se pretende dar una visión general sobre las particularidades de la técnica del tapial, predominante en nuestra región, y exponer los estudios realizados sobre el patrimonio existente así como los objetivos, metodología y resultado de la investigación desarrollada para analizar la aplicación de nuevos productos en la consolidación de muros de tapia, realizada conjuntamente por el Departamento de Construcción y Tecnología Arquitectónicas de la Escuela Técnica Superior de Arquitectura de Madrid y la ONGD Inter-Acción.

  12. Cubierta suspendida para una nave industrial, en Mantua (Italia

    Directory of Open Access Journals (Sweden)

    Nervi, Pier Luigi

    1965-10-01

    Full Text Available This building is owned by the Burgo Society, and will house one of the three largest paper making machines in the world. It occupies a surface of 250 by 50 metres, and has no intermediate supports. The roof is undoubtedly the most important feature of it. Two framed towers, 50 m high, and of a distinctive outline, support four main cables, from which secondary hangers support the metal framework of the roof itself. The towers are separated 163 m from each other, and the suspension cables extend a further 43 m on each side of them. The enclosing walls consist of metal columns, separated by large glazed panels, and based on brick and concrete foundations. The joint between the independent vertical walls and the horizontal roof has been effected with plastic materials, which allow for the relative deflections of both the walls and the roof.Este edificio ha sido construido por la Sociedad Burgo, para albergar una de las tres mayores máquinas del mundo en la fabricación de papel. Su planta, de 350x30, está libre de soportes intermedios. La cubierta es, sin duda, la parte más interesante de la obra. Dos torres porticadas de 50 m de altura y graciosa línea soportan cuatro cables principales, desde los cuales parten los secundarios que sostienen el reticulado metálico de la cubierta propiamente dicha. Estas torres están situadas entre sí a 163 m, con dos vuelos laterales de 43 metros. Los muros de cerramiento están formados por montantes metálicos, con grandes zonas intermedias de cristal, sobre base de fábrica de ladrillo y hormigón. La unión entre muros independientes y cubierta se ha realizado con materiales plásticos, con objeto de permitir los movimientos relativos de ambos elementos constructivos.

  13. Reto Europeo: la Eficiencia Energetica en Edificios. La Nueva Directiva Comunitaria 31/2010

    Directory of Open Access Journals (Sweden)

    Fernández, Pablo Sandoval

    2011-08-01

    Full Text Available Abstract: The new European Directive2010/31 is trying to achieve a 20%reduction in greenhouse gas emissionsbellow 1990 levels, and by 30% in theevent of an international agreementbeing. The E.U. has a major goal to reduceour oil dependency and use morerenewable energy, especially in buildingswhere 40% of the total energy consumptiontakes place. The Directive wants toestablish a plan to achieve our goal tocompletely reduce the use of energy inbuildings by 2020. The new buildingsoccupied and owned by public authoritiesmust comply with the proposed regulationby 2018 to serve as an exampleto the private sector. By increasing renewableenergy sources the goal is to reducethe Greenhouse effect since we arealready noticing it in our daily lives andcontinuing being the global and multilateralengine of the policies against theClimate Change.Resumen: La nueva Directiva Comunitaria31/2010 pretende la consecución de una reducciónde los gases de efecto invernadero en un20% con respecto a 1990, que podría incrementarseen un 30% si existe un compromiso internacional.La UE se ha marcado como objetivo lasustitución del empleo de combustibles fósilespor energías renovables y una mayor eficienciaenergética, especialmente en los edificios dondese consume el 40% del total de energía de la UE.Esta Directiva establece la obligatoriedad de losEstados miembros de adoptar políticas y planespara conseguir que los edificios de nueva construcciónsean de consumo de energía nulo en el2020. Los edificios de titularidad pública deberánadelantarse al 2018 en dicho objetivo comopapel ejemplarizante que toda Administracióndebe jugar. Con este paso y con una sustituciónprogresiva del empleo de combustibles fósilespor energías renovables, la UE pretende mitigarlos graves efectos del calentamiento global, queya empezamos a notar en nuestra vida cotidiana,y continuar siendo el motor global y multilateralde las políticas contra el Cambio Climático.

  14. Investigación e impacto ambiental de los edificios. La energía

    Directory of Open Access Journals (Sweden)

    Rodríguez Aumente, Pedro A.

    2005-08-01

    Full Text Available This conference describes the main problems of energy use in face of the depleting of fosil resources, energy supply and emission of atmospheric toxic gases, green house effect gases and ozone depleting gases. The relevance of energy consumption in the environment impact is commented, as well as the key points for the posible evolution of the problem and in the appropriate technology research to cope with them In order to improve the energy and ecological efficiency of buidings. The main characteristics of present day technologies for the introduction of renewable energies in buidings are comented, dealing with their barriers for the widespread use. The most recent research on air conditioning using thermal solar energy with absorption machines is described, with application to Madrid.Se presenta la problemática actual del uso de la energía de cara al agotamiento de las fuentes fósiles, el abastecimiento y la contaminación atmosférica de gases tóxicos, de efecto invernadero y destructores de la capa de ozono. Se comenta la relevancia de la energía en el impacto ambiental de los edificios y se discuten los distintos aspectos que inciden en la posible evolución futura del problema y en la mejor estrategia de investigación tecnológica para tratar de mejorar la eficiencia energética y medioambiental de los edificios, especialmente en España. Se presentan las tecnologías actuales de introducción de las energías renovables en los edificios y se comentan sus más relevantes características, haciendo hincapié en las barreras para su difusión. Se describe la actividad más reciente de investigación en la climatización por energía solar haciendo uso de máquina de absorción, con aplicación a Madrid.

  15. Los edificios deportivos de la Roma Antigua Sportive buildings in the ancient Rome

    Directory of Open Access Journals (Sweden)

    Angela TEJA

    2013-09-01

    Full Text Available La educación física y el deporte retrocedió —en la Roma antigua— respecto a los ideales físico-corporales griegos. Por contra, se fomentó una notable cultura de espectáculos y divertimentos, especialmente durante la época imperial. A fin de dar cobijo a los diversos espectáculos se construyeron en la ciudad de Roma —y por mimetismo en todas las urbes del Imperio— sofisticados edificios. En efecto, además de una importante red de circos —el más emblemático de los cuales fue el circo Máximo—, se levantaron anfiteatros y termas, amén del estadio de Dominiciano. La autora pasa revista a las distintas instalaciones «deportivas» de la Roma antigua, así como a los espectáculos que albergaban: las carreras del circo, los combates de gladiadores, las cacerías de fieras, las naumaquias, sin olvidar las competiciones del estadio y la pasión romana por las termas.Sport and physical education —in Ancient Rome-, looked back to the physical ideals of the Greeks. In contrast, there was also a specific encouragement of spectacles and performance or general entertainment during the Imperial Era. In order to cater for the diverse shows, sophisticated buildings were constructed in Rome, and reproduced in all the built-up areas throughout the Empire. In fact, besides the important circus network, the most emblematic of these being Maximo's Circus, amphitheatres, arenas and spa resorts were constructed, in addition to the Dominitian Stadium. The author studies the different types of «sporting» installations in Ancient Rome, considering the entertainments which took place in them: chariot races, gladiatorial combat, the hunting of wild beasts, naval combats, the stadium sports and, of course, the Roman passion for spas and hot baths.

  16. La restauración de la iglesia de Santa María del Castillo de Castelldefels (Barcelona, España

    Directory of Open Access Journals (Sweden)

    González Moreno-Navarro, Antoni

    1996-10-01

    Full Text Available The church next to the castle of Castelldefels (both municipal property has been restored for its use as civic center and meeting point for historical studies related to that fast growing township. In its presbytery traces of the early Iberian and Roman settlements can be seen, and also, in one of the chapels, graffiti left by International Brigades occupying the castle during the Civil War between 1938 and 1939. The church has regained yet its fortress look with white walls.

    La iglesia aneja al castillo de Castelldefels, ambos edificios de propiedad municipal, ha sido restaurada para su uso como espacio cultural y punto de información histórica de un municipio que ha sufrido un rápido crecimiento. En el presbiterio pueden verse los restos de los primeros asentamientos ibéricos y romanos y, en una capilla, los grafitos que dejaron los combatientes de las Brigadas Internacionales que ocuparon el castillo durante la Guerra Civil, entre 1938 y 1939. El edificio ha recuperado también su apariencia de iglesia fortificada de muros blancos.

  17. Eficiencia energética: estrategias aplicadas en el nuevo edificio de las Consejerías de Mérida (España

    Directory of Open Access Journals (Sweden)

    Montero, Eduardo

    2007-03-01

    Full Text Available The architecture office GOP was awarded the execution of the project for the regional government office building “Consejerías” in the city of Mérida, designed by Bruce S. Fairbanks, through an International Competition of Ideas summoned by the Junta de Extremadura. The new Consejerías in Mérida set the standards for a wholly sustainable building. It modifies its natural outdoors environment by soothing the climate and giving shelter. A design strategy was, among others, to gain as much confort as possible inside the building: thermal confort, visual confort, indoor air quality and acoustic quality. The new Consejerías underlying precept is to make a simple building, so they are designed to meet all these objectives by taking full advantage of architectonic means rather than requesting to technical fixtures for the conditioning of their indoor environment. The system designed to benefit from the inertia of the soil as a buffer for the building interior temperatures has never been used in Spain in large facilities, because they require large air volumes due to their low specific temperature. In this case, an air-to-earth heat exchanger was included in the project for a large institutional building.El Estudio GOP ha obtenido la adjudicación del proyecto del edificio de Consejerías en la ciudad de Mérida, diseñadas por Bruce S. Fairbanks, mediante el Concurso Internacional de Ideas convocado por la Junta de Extremadura. Las nuevas Consejerías de Mérida se constituyen como un ejemplo de edificio sostenible en todos sus aspectos. El edificio modifica el entorno natural externo moderando el clima y ofreciendo protección y cobijo. Entre las estrategias seguidas al diseñarlo está obtener el máximo confort en el interior: confort térmico, confort visual, calidad del aire interno y calidad acústica. Las nuevas Consejerías están diseñadas para alcanzar todos estos objetivos, manteniendo la idea subyacente de un edificio simple

  18. La Inspección Técnica de Edificios como herramienta de la mejora energética de la edificación existente

    Directory of Open Access Journals (Sweden)

    Serrano Lanzarote, B.

    2015-03-01

    Full Text Available The regulatory framework of the Spanish Technical Building Inspection (Inspección Técnica de Edificios, ITE has recently been modified in order to adapt it to the new needs in the buildings refurbishment field, broadening its focus from solely on the conservation state to include issues such as energy certification and accessibility. Currently, this procedure has a new name: Buildings Evaluation Report (Informe de Evaluación de los Edificios, IEE. In this article the potential of this instrument in promoting energy savings in household is discussed. However, the ITE legislation is not enough, since there are a large number of municipalities in which this procedure has not yet been established. Strategies are proposed to overcome this barrier and to ensure that these technical reports are implemented at large scale; otherwise the expected energy savings induced by the ITE in the residential park will hardly be achieved.El marco normativo de la Inspección Técnica de Edificios (ITE, en adelante en España ha sido modificado recientemente con objeto de adecuarlo a las nuevas necesidades en materia de rehabilitación de edificios, ampliando su enfoque sobre el estado de conservación, hacia aspectos como la certificación energética y la accesibilidad, pasando a designarse Informe de Evaluación de los Edificios (IEE, en adelante. En este artículo se expone el potencial de dicho instrumento para fomentar el ahorro energético en las viviendas. No obstante, el simple hecho de legislar la ITE no ha sido suficiente, pues existe un gran número de municipios en los que no está implantada. Se presentan unas estrategias para ayudar a salvar esta barrera y garantizar que estos informes comiencen a elaborarse a gran escala, pues, de lo contrario, difícilmente se alcanzará el hipotético ahorro energético, inducido por la ITE, en el parque residencial.

  19. The distribution of the electric energy consumed in the World Trade Center building; La distribucion de la energia electrica consumida en el edificio World Trade Center

    Energy Technology Data Exchange (ETDEWEB)

    Gaona de la Fuente, Alvaro; Carrillo Borja, Angel [Luz y Fuerza del Centro, Mexico, D. F. (Mexico)

    1997-12-31

    This document describes the distribution of the electric energy in the World Trade Center building. Also called the Business International Capital, it is a modern international concept that integrates under the same roof services and supports required by the foreign commerce, with a great 50 stories high building, information network, a business center, a commercial center, an international center for exhibits and conventions and a luxury hotel. It is a modern building equipped with a numberless technological advancements an a total installed electrical load of 35000 kVA. The distribution structures utilized for high buildings are described, the structure that was decided to adopt in the World Trade Center, the requirement for the execution of the distribution electric work, the Luz y Fuerza installations in the buildings conglomerate, the operation and maintenance of the distribution network of this building and the basic needs for new installations of this type of buildings [Espanol] En el presente documento se describe la distribucion de la energia electrica del edificio World Trade Center de la ciudad de Mexico. Llamado tambien la capital internacional de los negocios es un moderno concepto internacional que integra bajo un mismo techo servicios y apoyos que se requieren para el comercio exterior contando con una gran torre de 50 pisos, red de informacion, un centro de negocios, un centro comercial, un centro internacional de exposiciones y convenciones y un hotel de lujo. Es un edificio moderno equipado con un sinnumero de adelantos tecnologicos y con una carga total instalada de 35000 kVA. Se describen las estructuras de distribucion utilizadas en edificios altos, la estructura que se decidio implantar en el World Trade Center, los requerimientos para la ejecucion de la obra electrica de distribucion, las instalaciones de Luz y Fuerza en el conjunto de dicho edificio, la operacion y mantenimiento de la red de distribucion de este edificio, y las necesidades

  20. Dos obras de Kohn-Pedersen-Fox/EE.UU

    Directory of Open Access Journals (Sweden)

    Editorial, Equipo

    1985-12-01

    Full Text Available Two works by Pedersen Fox Associates PC are described in this article. In the first one, the play of volumes and the curved curtain wall façade are the leading part defining the building. At the same time it must be pointed out the decorative use of the different cladding materials and the contrast between the base of the volume and its upper part, of a very different feature from the point of view of the design. The second work takes benefit of the site with symbolic aims as for its façade, the whole being harmonized around a gardened inner court full colored.En la primera de ellas juegan un papel decisivo el cerramiento de muro-cortina y la línea curva de la fachada, elementos ambos que definen el edificio. Asimismo hay que destacar el empleo decorativo de los diferentes materiales de revestimiento y el contraste entre la base del edificio y la parte superior, de muy distinta concepción desde el punto de vista del diseño. La segunda de ellas aprovecha con fines simbólicos el emplazamiento del edificio en cuanto a su fachada principal armonizándolo con una distribución en torno a un patio interior ajardinado, con predominio del color.

  1. EXPERIENCIAS CONSTRUCTIVAS DEL TERREMOTO DE LORCA

    Directory of Open Access Journals (Sweden)

    José-Carlos Salcedo Hernández

    2012-01-01

    Full Text Available El terremoto de Lorca del 11 de mayo de 2011 es el más importante que ha sufrido el territorio peninsular español en los últimos 55 años, desde el terremoto de Albolote (Granada de 1956 que, casualmente, fue del mismo tipo y tuvo idéntica magnitud de 5,1 grados en la escala Richter. En estos 55 años, la tipología de los edificios ha cambiado completamente, pasando de edificios de muros de fábrica de hasta dos plantas de altura, a la generalización de edificios de pisos de una media de 6 plantas, de pilares y vigas con nudos rígidos y forjados de hormigón. Es importante extraer experiencias constructivas del comportamiento que han tenido los edificios de Lorca, porque es el único caso real de que disponemos, para la mejora de la seguridad estructural antisísmica de los edificios en España. En Lorca se ha constatado el mal comportamiento de las estructuras de fábrica de ladrillo con las que está construido el patrimonio histórico. Se ha probado que, con la sola excepción de un edificio, las estructuras nuevas de hormigón y acero han superado una aceleración sísmica del triple de la prevista por la norma sismorresistente NCSE-02, con la que fueron calculadas. Por el contrario, se ha constatado un pésimo comportamiento de los elementos de fábrica (petos, cerramientos, tabiques, etc, de ladrillo con fracasos generalizados, que son los que produjeron los enormes daños materiales en las viviendas y los daños personales. Estos elementos no son «estructurales», pero la norma NCSE-02 establecía para ellos unas condiciones que no debieron aplicarse en las construcciones realizadas desde su implantación.

  2. Seguimiento de obra de un edificio industrial entre medianeras en Barcelona

    OpenAIRE

    Toro Galván, Jaime

    2012-01-01

    Estas líneas sirven para resumir lo que en páginas posteriores será el desarrollo completo del proyecto final de carrera. Como indica el título “Seguimiento de obra de un edificio industrial entre medianeras en Barcelona” el objetivo es reflejar los procesos de ejecución, control de costes, planificación y control de calidad, así como los diferentes procesos necesarios para el control de una obra. En una primera parte, veremos de forma general la metodología de control y seguimien...

  3. THE POSTERIOR DISTRIBUTION OF sin(i) VALUES FOR EXOPLANETS WITH MT sin(i) DETERMINED FROM RADIAL VELOCITY DATA

    International Nuclear Information System (INIS)

    Ho, Shirley; Turner, Edwin L.

    2011-01-01

    Radial velocity (RV) observations of an exoplanet system giving a value of M T sin(i) condition (i.e., give information about) not only the planet's true mass M T but also the value of sin(i) for that system (where i is the orbital inclination angle). Thus, the value of sin(i) for a system with any particular observed value of M T sin(i) cannot be assumed to be drawn randomly from a distribution corresponding to an isotropic i distribution, i.e., the presumptive prior distribution. Rather, the posterior distribution from which it is drawn depends on the intrinsic distribution of M T for the exoplanet population being studied. We give a simple Bayesian derivation of this relationship and apply it to several 'toy models' for the intrinsic distribution of M T , on which we have significant information from available RV data in some mass ranges but little or none in others. The results show that the effect can be an important one. For example, even for simple power-law distributions of M T , the median value of sin(i) in an observed RV sample can vary between 0.860 and 0.023 (as compared to the 0.866 value for an isotropic i distribution) for indices of the power law in the range between -2 and +1, respectively. Over the same range of indices, the 95% confidence interval on M T varies from 1.0001-2.405 (α = -2) to 1.13-94.34 (α = +2) times larger than M T sin(i) due to sin(i) uncertainty alone. More complex, but still simple and plausible, distributions of M T yield more complicated and somewhat unintuitive posterior sin(i) distributions. In particular, if the M T distribution contains any characteristic mass scale M c , the posterior sin(i) distribution will depend on the ratio of M T sin(i) to M c , often in a non-trivial way. Our qualitative conclusion is that RV studies of exoplanets, both individual objects and statistical samples, should regard the sin(i) factor as more than a 'numerical constant of order unity' with simple and well-understood statistical

  4. Edificio Rosental, en Basilea, Suiza

    Directory of Open Access Journals (Sweden)

    Suter & Suter, Arquitectos

    1966-11-01

    Full Text Available The new exposition building for the Swiss Samples Fair contains two basements, a ground-floor, a gallery and two pper-floors. The technical equipment and the stores are kept in the bottom basement, whilst the first basement serves for exhibition purposes. The ground floor is devoted to all exposition possibilities, but especially for heavy and big machinery. Beside of special expositions, restaurant facilities are foressen on the gallery-floor. The two upper-floors are devoted to conventional types of expositions. Since the building should be erected in the very short time of nine months, the construction has been done with precast reinforced concrete units.El nuevo edificio para exposiciones construido en el recinto de la Feria de Muestras de Basilea, consta de: dos sótanos, planta baja, entreplanta y dos plantas de altura. El segundo sótano contiene los almacenes; el primer sótano está destinado a exposición de mercancías; la planta baja, a exhibición de mercancías y maquinaria pesada; la entreplanta, a exposiciones especiales; y las otras dos plantas, a exposiciones normales. La construcción ha sido realizada a base de elementos prefabricados de hormigón armado.

  5. Análisis y propuesta de mejoras para la eficiencia energética del edificio principal del Instituto c.c. Eduardo Torroja-CSIC

    Directory of Open Access Journals (Sweden)

    Martín-Consuegra, F.

    2014-12-01

    Full Text Available As part of the 80th anniversary of IETcc-CSIC, a proposal for the rehabilitation of the 1953 building is made. The analysis of the main building’s energy performance concludes that it is not energy efficient. Energy efficiency improvement measures based on European directives are proposed, It is recommended to incorporate them step by step, starting with passive measures to reduce energy needs. Afterwards active measures, such as improving the performance of facilities, are proposed, so that the least possible amount of final energy is used to meet the comfort standards. To complete the operation, the use of renewable energy sources is proposed to reduce the consumption of non-renewable primary energy. Energy and building rehabilitation improvement measures in the IETcc-CSIC should be demonstrators for other public buildings with heritage values.En el marco del 80 aniversario del IETcc-CSIC se elabora una propuesta para la rehabilitación del edificio construido en 1953. Partiendo del análisis del comportamiento energético del edificio principal, se concluye que este no es eficiente energéticamente. Se proponen mejoras para la eficiencia energética del edificio tomando en cuenta las directivas europeas. Se recomienda incorporar las mejoras de forma escalonada, comenzando por las medidas pasivas para reducir sus necesidades energéticas. A continuación se proponen medidas activas, como la mejora del rendimiento de las instalaciones, de manera que se emplee la menor cantidad posible de energía final para satisfacer el confort de los usuarios. Para completar la intervención se propone el uso de fuentes de generación de energías renovables en la parcela con el objetivo de reducir el consumo de energía primaria no renovable. Las acciones para la rehabilitación energética e integral del edificio del IETcc-CSIC, deben ser demostradoras para otros edificios públicos con valores patrimoniales.

  6. Automatización o control: La percepción de los usuarios de edificios de oficinas inmóticos

    Directory of Open Access Journals (Sweden)

    Silvia Hernández

    2012-12-01

    Full Text Available La crisis energética mundial sumada a indicadores internacionales de confort para edificios de oficinas requiere de diseñadores de edificios domóticos que logren espacios de trabajo de alto rendimiento, con confort efectivo y con eficiencia energética, incluyendo pautas de diseño sustentable. En este artículo se presenta un estudio de casos de edificios inmóticos de oficinas de clima templado, en la zona central de Córdoba, Argentina. Se realizaron encuestas postocupación -EPO-, haciendo énfasis en el área de los sistemas inmóticos; ambiental, seguridad e iluminación. Del mismo modo, se requirió la opinión del usuario respecto de su relación con la inmótica, y la posibilidad de accionar o intervenir en los sistemas para alcanzar las mejores situaciones de confort. Se consideraron distintos sistemas y sus prestaciones con el objetivo de determinar los modos de relación entre sujeto activo y pasivo. Se concluye que para lograr el confort en las oficinas inmóticas se debería contemplar desde el diseño la actitud crítica de los usuarios y su voluntad manifiesta de cambiar las condiciones de confort que le han sido determinadas, considerando la inclusión de más interfaces gráficas.

  7. Edificio industrial, en Kuwait

    Directory of Open Access Journals (Sweden)

    Farmer y Dark, Arquitectos

    1963-11-01

    consecuencia la construcción de grandes centrales eléctricas. La central «A» es uno de los varios edificios que constituyen el grupo suministrador de energía y agua potable a Kuwait; dispone de cuatro turboalternadores, y se ha estudiado, para el interior, una presión y movimiento del aire, suficiente para contrarrestar la acción del exterior e impedir la entrada de la arena que arrastran las tempestades frecuentes. En cuanto al aspecto de sus fachadas, se ha pretendido conseguir que armonicen con los edificios circundantes. La línea arquitectónica es audaz e irregular, buscando variedad de perfiles y diversos juegos de luces y sombras, que recuerden las construcciones indígenas de barro, con formas puras y elementales, pero quebradas y redondeadas por la acción del tiempo. El color en los interiores ha sido estudiado para dar la impresión de frescura; en el exterior sólo se han pintado las zonas que podían reflejar molestamente los rayos solares. El conjunto resulta agradable, dentro de su sencillez, cual corresponde a una instalación de tipo industrial, y no faltan detalles de buen gusto y de preocupación por la gente que ha, de permanecer allí algunas horas del día, como ocurre con el balcón de las oficinas, que mira al mar, y el estanque y zonas verdes del parque de entrada.

  8. Estudio del álbum sin palabras

    OpenAIRE

    Bosch Andreu, Emma

    2015-01-01

    [spa] Estudio del Álbum Sin Palabras tiene como objetivo principal definir, analizar y categorizar los álbumes sin palabras destinados principalmente al público infantil y juvenil dando a conocer sus características, peculiariades y diversidad tipológica, para facilitar las tareas de análisis y de mediación de investigadores, educadores, bibliotecarios y cualquier persona interesada en los libros con imágenes. En el capítulo titulado «Un nuevo mapa para los Libros Sin Palabras» situamos e...

  9. Propuesta intervención energética en un edificio plurifamiliar

    OpenAIRE

    López Burdeus, Paula

    2013-01-01

    Treball final de Grau corresponent a la titulació d'Arquitectura Tècnica. Curs 2012/2013 Uno de los aspectos fundamentales en un edificio residencial es el confort térmico, se considera cada vez más relevante minimizar las pérdidas térmicas a través de la envolvente de las edificaciones y de sus instalaciones, garantizando un mínimo de confort. Cabe destacar también que la existencia de pérdidas térmicas suponen el derroche de energía. Es por ello que cuando se habla de rehabilitación s...

  10. Metodología de diagnóstico de humedades de capilaridad ascendente y condensación higroscópica, en edificios históricos

    OpenAIRE

    García Morales, Soledad

    2012-01-01

    El presente trabajo de investigación propone un método de diagnóstico para las humedades que se suelen conocer como "humedades de capilaridad ascendente". Cuando este problema afecta a edificios de cierta antigüedad (los que se denominan de aquí en adelante "edificios históricos*), es frecuente que las soluciones constructivas que se adoptan en los proyectos de rehabilitación o restauración, no suelan producir los efectos deseados, ante la perplejidad de los técnicos. La razón de este hecho s...

  11. Ampliación de un edificio de oficinas – Hamburgo - Alemania Federal

    Directory of Open Access Journals (Sweden)

    Schramm, Jost

    1976-12-01

    Full Text Available This construction consisting of 5 storeys plus attic is an enlargement of an already existing office building. As a consequence this old building has been entirely remodeled and only the heavy work and the classic facade have been maintained. The main premise was that of unifying the functions and spaces of the two buildings. With regard to the structure this implied the same floor height for the old as well as the new building.; and with regard to the interior, the use of the same materials and construction systems for the lining of the ground surfaces and the conditioning of ceilings as well as sharing of the vertical communication nuclei in addition to the sanitary installations. The idea of achieveing a unified complex was carried out as far as possible; thus, the centralized heating and ventilation installations are being shared, as are also the electrical, lighting and telephone systems. The complex that combines the two different exterior architectural styles in a harmonious manner is further completed with a 23-car parking place which occupies the left over area of the plot.El edificio consta de 5 plantas y ático, para ampliar otro existente destinado a oficinas. Este hecho ha traído como consecuencia la total remodelación de la construcción antigua, en la que únicamente se han mantenido la obra gruesa y su fachada de aspecto clásico. La premisa principal fue unificar las funciones y los espacios de ambos edificios. Esto se traduce, en lo que se refiere a la estructura, en que la altura de forjados del nuevo edificio viene definida por la de los del antiguo; y en cuanto al tratamiento interior, en la utilización de los mismos materiales y sistemas constructivos para el revestimiento de suelos y acondicionamiento de techos, así como en el compartir las zonas de servicio y los núcleos de comunicaciones verticales. La consecución de un conjunto unificado se llevó hasta sus últimas consecuencias; y así, también son

  12. Sunkist. Edificio Central – (EE. UU.

    Directory of Open Access Journals (Sweden)

    Albert C. Martin, Asociados

    1972-04-01

    Full Text Available Sunkist central building – (U.S.A. Architects: Albert C. Martin and Associates It consists of three floors: — the ground floor includes an auditorium, kitchen and cafeteria, a private diningroom, office area, etc.; — on the first floor are the sales department and the electronic data processing department, and — on the second floor, the firm's executive personnel department, and three kitchens for experimenting with products and developing formulas. This building was planned with the idea of reviving, by the design and the materials used, the memory and character of Old California.Consta de tres plantas: — la baja comprende: un auditorio, cocina y cafetería; un comedor privado, una zona dedicada a oficinas, etc.; — la segunda planta contiene: los departamentos de ventas y de proceso electrónico de datos, y — en la tercera planta se distribuyen: el departamento de personal ejecutivo de la empresa; y tres cocinas para la experimentación de productos y de fórmulas a desarrollar. El edificio fue proyectado pensando en que, por sus materiales y diseño, suscitase el recuerdo y el carácter de la antigua California.

  13. Edificio administrativo para la IBM de Alemania - Hannover (Alemania Federal

    Directory of Open Access Journals (Sweden)

    Oesterlein, D.

    1973-03-01

    Full Text Available This building is made up of three stepped bodies, both in plant and elevation view: — one for computation, — the second for training, and — another middle one which joins them, and through which the former can be entered. At the height of the first floor, a passable canopy provides the building with acoustic and light protection. The building is made with reinforced concrete with opaque window panes in aluminium frames. The computations centre, as such, is on street level, enabling passers-by to see inside. The training section is made up of three floors. Every eight pupils form a group, using two television screens, also having contact with the instructor by means of intercoms. There are two car parks at the back of the building: one on street level for 45 vehicles, and another for 70 in the basement. The whole building has high and lowpressure air conditioning. There are four lifts and a special internal transport system for documents. The mesh of the roof, enables the inner walls to be moved.Este edificio consta de tres cuerpos escalonados, tanto en planta como en alzado: uno, de cálculo; un segundo, para enseñanza, y otro intermedio, que une y da entrada a los anteriores. A la altura de la primera planta un voladizo transitable da protección acústica y luminosa al edificio. La construcción es de hormigón armado, con cristaleras opacas sobre marcos de aluminio. El centro de cálculo, propiamente dicho, está situado a la altura de la calle, permitiendo a los transeúntes observar el interior. La sección de enseñanza consta de tres plantas. Cada ocho alumnos forman un grupo, que utiliza dos pantallas de televisión, manteniendo contacto además con el instructor mediante interfonos.

  14. Edificio Roca, calle San Vicente, 32 (1934-36) Valencia: proyecto de interiorismo

    OpenAIRE

    CARBONELL SANTACRUZ, MARÍA DE LA LUZ

    2012-01-01

    Este Proyecto Final de Grado trata sobre la reutilización del Edificio Roca (1934-36), que está situado en la calle San Vicente, 32, de Valencia y es obra del arquitecto Vicente Valls Gadea (1985-1922). El proyecto se articula en tres fases. La fase inicial comienza con el estudio histórico de la ciudad de Valencia. A continuación trata de la arquitectura europea a partir de la Revolución Industrial y el movimiento arquitectónico racionalista en Valencia. Por último, se estudia la calle...

  15. El Uso de cal para salvar muros de fortificaciones como un legado de la Arquitectura Militar de la Colonia

    Directory of Open Access Journals (Sweden)

    Walter Domínguez Vega

    2009-01-01

    Full Text Available Se aborda el uso de la cal en la restauración y conservación de las fortificaciones de la línea defensiva Holguin ¿Gibara. Se basa en la tendencia actual para la conservación sostenible de los bienes patrimoniales y culturales que orienta los materiales utilizados en los trabajos de intervención, se detiene sobre la relevancia y alcance histórico cultural del patrimonio fortificado en la provincia de Holguín, describe las características constructivas de sus muros, los morteros utilizados y las dificultades para la conservación de estas. Propone que se revitalice el uso de la cal en obras de conservación.

  16. Edificio industrial Crane-Fisa, España

    Directory of Open Access Journals (Sweden)

    Heredia & Moreno S. A., Ingenieros

    1970-11-01

    Full Text Available This article describes the construction of an important industrial building near Madrid. It consists of a large industrial nave and a block of offices. The structure is metallic, and the enclosing walls are of brick, whilst the the roofing material is aluminium and steel. This project is very effectively fitted with heating, air conditioning, air and propane gas installations, and an elaborate electricity supply system.En este artículo se describe, con claridad, la construcción de un importante edificio industrial en las proximidades de Madrid. Se compone de una gran nave de fabricación y un cuerpo más bajo destinado a oficinas, con estructura metálica, cerramiento a base de paneles de fábrica de ladrillo y cubierta de placas de aluminio-acero. Se han previsto, asimismo, las adecuadas instalaciones de suministro y evacuación de agua, calefacción, ventilación, aire acondicionado, aire comprimido y propano, además de una completísima instalación eléctrica.

  17. Propuesta de la certificación energética, mediante simulación dinámica, como herramienta de gestión energética ISO 50001 Versus auditoria energética en edificios.

    OpenAIRE

    Rey Hernández, Javier María; Rey Hernández, Alberto; Velasco, Eloy; San José, Julio; Rey Martinez, Francisco Javier

    2017-01-01

    Producción Científica El objetivo es el estudio de la gestión energética ISO 50001, mediante las herramientas de sistema de gestión tales como la auditoría energética y compararlo con la certificación energética mediante simulación dinámica, aplicadas a un edificio universitario estándar. La metodología empleada para alcanzar unos resultados de ahorro y eficiencia energética, aplicados a un edificio universitario, pretenden servir de modelo para poder extrapolarlos a edificios que compo...

  18. Sin Stocks in Self Managed Superannuation Funds

    Directory of Open Access Journals (Sweden)

    Peter J. Phillips

    2011-06-01

    Full Text Available Ethical or responsible investing has attracted much attention over the last decade. Financial planners can nowadvise clients on a broad range of ethical investment products and some financial planning firms have this astheir sole activity. Interestingly, the alter ego of ethical investing, sin or vice investing, has attracted far lessattention. Recent research shows that ‘sinful’ investments can generate very strong returns and shouldcertainly not be avoided by investors without a full evaluation of the consequences of excluding theseinvestments from the portfolio. This paper extends these findings into the field of self managedsuperannuation funds operating within an Australian context. The prevalence of sinful investments within asample of SMSFs and the returns that may be generated by a portfolio consisting of sinful Australian equitiesis examined. Analysis reveals that the SMSF investors within the sample do not include very many sin stocksin their portfolios. However, it does not appear as though SMSF trustees are missing an important investmentopportunity because the analysis reveals that an equally-weighted portfolio of all vice or sin shares is unlikelyto generate superior returns.

  19. Ja kun sinä helluni (2/4, 3/4 F)

    OpenAIRE

    2011-01-01

    Laulun sanat: Ja kun sinä helluni, meillen tuut, älä ketäkään tervehtele, aja vain hevoses tallin eteen äläkä ujostele! Ja kun sinä, helluni, meillen tuut, niin tule sinä illalla hiljaa! Tule sinä naapurin pellon poikki ja älä sinä polje viljaa!

  20. The seven sins of memory: implications for self.

    Science.gov (United States)

    Schacter, Daniel L; Chiao, Joan Y; Mitchell, Jason P

    2003-10-01

    We examine the relation between memory and self by considering errors of memory. We draw on the idea that memory's imperfections can be classified into seven basic categories or "sins." Three of the sins concern different types of forgetting (transience, absent-mindedness, and blocking), three concern different types of distortion (misattribution, suggestibility, and bias), and one concerns intrusive memories (persistence). We focus in particular on two of the distortion-related sins, misattribution and bias. By describing cognitive, neuropsychological, and neuroimaging studies that illuminate these memory sins, we consider how they might bear on the relation between memory and self.

  1. Días sin TV: la salud del hombre

    OpenAIRE

    Nelson González Leal

    2004-01-01

    Hoy hace una tarde tranquila. Por la ventana lateral del apartamento se cuela un zumbido espasmódico y ligero, lo producen los escasos automóviles que cruzan la avenida de cuando en cuando. El edificio que habito parece un Titán dormido, trasmite una molicie áspera y duradera, pero eso no quiebra la armonía del ambiente, por el contrario, le otorga sentido al clima, que es casi tibio. Son las cinco pasado el meridiano y los árboles juguetean con una brisa ligera y torpe, que de cuando en cuan...

  2. The cob building technique. Past, present and future

    Directory of Open Access Journals (Sweden)

    Watson, L.

    2011-09-01

    Full Text Available Cob, an ancient earth building technique has given rise to hundreds of thousand buildings across Europe for centuries. It has a very distinct appearance of substantial organic walls punctuated with small apertures whose windows and doors are set back to create deep reveals. Traditionally protected by thatched roofs, these vernacular buildings make an important contribution to local identity. Cob buildings still survive and continue to be occupied in many European countries including France, Italy, Germany, Belgium, Czech Republic and England (1. Following a description of the cob technique, this paper will present a brief overview of the history of cob in Devon, a county in South West England. Recent English cob buildings will be introduced with a discussion of the potential of this earth building technique for future architecture.

    A través de Europa, cientos de miles de edificios han sido construidos por un método de construcción antiguo, el uso del cob. Estos edificios tienen una apariencia característica de muros orgánicos salpicados con pequeñas aperturas cuyas puertas y ventanas se rehunden para crear profundos relieves. Tradicionalmente protegidos por techos de paja, en estos edificios vernáculos está una parte importante de la identidad local. En muchos países europeos todavía se encuentran edificios hechos de cob, como Francia, Italia, Alemania, Bélgica, República Checa, e Inglaterra (1. Después de una descripción sobre el uso de cob, este artículo presentará una historia breve del uso de cob en Devon, una región en el suroeste de Inglaterra. También introducirá ejemplos de edificios modernos de cob, con una discusión sobre el potencial de usar este método de construcción en proyectos arquitectónicos en el futuro.

  3. El «Edificio Central» en las Palmas de Gran Canaria – España

    Directory of Open Access Journals (Sweden)

    Ruiz Duerto, A.

    1972-11-01

    Full Text Available A description is given of the program, characteristics, and building solutions for this unique building, situated in downtown Las Palmas. The building complex is composed of two underground levels for parking, a ground-floor and mezzanine for commercial purposes, and open plaza with swimming pool, dressing rooms, cafeteria, restaurant, dance spot, playground, and a block of 15 floors containing 137 apartments of varying size arranged so as to minimize sun overexposure and maximize privacy. The structure is of reinforced concrete and lightweight slabs, and enjoys quality fixtures which assure excellent functioning.Se describe el programa, características y solución constructiva de este edificio singular, situado en el centro cívico de Las Palmas de Gran Canaria. Se compone de: — dos plantas de sótano para estacionamiento de vehículos; planta baja comercial; — entreplanta comercial; — planta libre ajardinada con piscina, vestuarios-aseos, cafetería, restaurante, club de baile, juego de niños, guardería, etc.; — un bloque de 15 plantas con 137 apartamentos, de superficie variada, y dispuesto de forma que evite perjuicios de soleamiento y vistas a los edificios circundantes. Estructura de hormigón armado y losas aligeradas, con toda suerte de instalaciones que aseguren su perfecto funcionamiento.

  4. Edificio de viviendas (1879) : Calle de la Paz, 13, Valencia : proyecto de interiorismo

    OpenAIRE

    GARZÓN CHAMBA, LIZETTE ANDREA

    2014-01-01

    Este TFG se centra en estudiar el edificio número 13 de la Calle de la Paz, del arquitecto Antonio Martorell y Trilles datado en 1879. El objetivo es la aplicación de criterios y conocimientos de intervención en un espacio físico preexistente del patrimonio arquitectónico, combinando técnicas y procedimientos gráficos avanzados. Se utiliza una metodología BIM (Building Information Modeling), orientado al estudio, análisis y propuesta de transformación, habilitación o cambio de uso. Se preten...

  5. Edificio de viviendas, locales comerciales y oficinas - Las Palmas, Gran Canaria

    Directory of Open Access Journals (Sweden)

    López Díaz, -

    1979-08-01

    Full Text Available This building stands on a square plot, between party walls, in a narrow old city street. The ground and basement levels are used for commercial spaces, the next levels above for office space and the last three upper levels for apartments, plus a setback penthouse. Each apartment, consisting of living-dining room, services and four double bed-rooms, is layed out lengthwise along a line perpendicular to the Street front, so as to better use the narrow available space, while the natural lighting and ventilation of the inner rooms is achieved by means of numerous shafts distributed throughout the surface. The building features reinforced concrete structure and special concrete panel partitions. The façade combines the same concrete panels, faced with ceramic tiles, with large aluminium windows and artificial, modular shaped, window sills and spandrels.

    En una parcela cuadrada, situada en una estrecha calle de la ciudad, se ha levantado este edificio entre medianerías que destina la planta baja y el sótano a locales comerciales, los dos niveles siguientes a oficinas y a viviendas las tres plantas superiores y el ático retranqueado. Cada vivienda —compuesta por estar-comedor, zona de servicio y cuatro dormitorios dobles— se desarrolla en sentido longitudinal, perpendicularmente a la calle, a fin de aprovechar la escasa fachada del edificio, obteniéndose la iluminación y ventilación naturales de las dependencias interiores mediante pequeños patios diseminados en la superficie. La construcción emplea estructura de hormigón armado y tabiquería constituida por piezas especiales de hormigón. En la fachada se combinan las mismas piezas de hormigón revestidas con plaquetas cerámicas, con grandes ventanales de aluminio y antepechos de piedra artificial de conformación reglada.

  6. Nota sobre colisiones de aves en las ventanas de edificios universitarios en Puerto Vallarta, México

    Directory of Open Access Journals (Sweden)

    Fabio Germán Cupul-Magaña

    2015-06-01

    Full Text Available Esta nota presenta las observaciones de 15 colisiones de aves en ventanas de edificios de la Universidad de Guadalajara en Puerto Vallarta, Jalisco, México, a lo largo de 94 días de estudio (24 de enero al 27 de abril del 2003. Columbina passerina fue la especie que presentó el mayor número de fatalidades: ocho.

  7. Trombe wall and glazings facades: Energy efficiency for different Portuguese Climates

    Directory of Open Access Journals (Sweden)

    Sacht, H. M.

    2013-09-01

    Full Text Available High performance glass and Trombe walls in the façade was studied in this research. The paper reports results of an ongoing investigation on a new façade system concept, designed as: “Façade Modules for Eco-Efficient Refurbishment of Buildings”, especially on energy efficiency of Trombe wall and glazing modules arrangement. Computational simulation was carried out by using the software DesignBuilder. Two double glazing types and Trombe walls were considered for three different climates in Portugal and four solar orientations. Results obtained for heating energy needs were compared to all façade configurations. The use of Trombe wall and the double self-cleaning glass in the façade point towards a significant decrease of heating energy needs. The great majority of the façades combinations presented energy needs lower than the maximum allowed by the Portuguese regulation (RCCTE.Esta investigación aborda el estudio de fachadas con cristales de altas prestaciones y muros Trombe. El artículo presenta los resultados de la investigación en curso sobre un nuevo concepto en sistemas de fachada, denominado "Módulos de fachada para el acondicionamiento ecoeficiente de edificios", especialmente enfocado a la eficiencia energética de muros Trombe y módulos con doble acristalamiento. Haciendo uso del software DesignBuilder se realizaron simulaciones de una estancia, analizando distintos conjuntos de fachadas modulares. Para la realización de las simulaciones se consideraron dos tipos de módulos de doble acristalamiento, dos configuraciones de muros Trombe, tres climas diferentes en Portugal y cuatro orientaciones solares. Se compararon los requerimientos de calefacción de cada una de las configuraciones, observándose que tanto los muros Trombe como los módulos de doble acristalamiento presentaron disminuciones significativas en cuanto a requerimientos de calefacción. De las configuraciones analizadas, la mayoría presentó demandas energ

  8. Valoración de la Infraestructura de los Edificios Religiosos para el Turismo Accesible en Villahermosa, Tabasco, México

    Directory of Open Access Journals (Sweden)

    Lidia Guillén Valencia

    2015-01-01

    Full Text Available Los turismos religioso y accesible han promovido conciencia social, aprendizaje y salud en todos sus aspectos, y han generado una considerable derrama económica debido al desplazamiento masivo de sus practicantes. No obstante, el turismo accesible ha encontrado una serie de obstáculos arquitectónicos para acceder a los templos. Por tal razón, fueron valorados antropometricamente los edificios religiosos de Villahermosa, Tabasco, México, para determinar si su infraestructura es incluyente con este tipo de turistas. Se caracterizaron los templos, se entrevistaron informantes clave y se disenso una matriz de evaluación considerando los trece criterios antropometricos de Gutiérrez y Buenfil (2005. El resultado fue que los siete templos valorados cumplen de manera parcial con los requisitos de accesibilidad, esto significa que las necesidades de los turistas no fueron consideradas apropiadamente. Es pertinente aplicar la normatividad para la adecuación de la infraestructura y equipamiento no solo de este tipo de edificios sino para cualquiera.

  9. When deviance becomes sin

    Directory of Open Access Journals (Sweden)

    Anton Senekal

    1999-03-01

    Full Text Available In this article a brief exposition is given o f what sin and deviance entail. This perspective is approached in terms of what is called the logovision premise. This premise essentially maintains that human perception of reality is primarily mediated through words and that only God's words allow us to see reality as it truly is. Thus we are enabled to respond appropriately to reality - especially evaluative reality. By then applying God’s words to the issues involved in the study of deviance, more clarity is hopefully achieved. This is done by discussing the respective characteristics of sin and deviance and by briefly exploring the relationship between these two phenomena. Finally some of the implications for the study o f social deviance are discussed.

  10. Edificio Charles Wilson, en la Universidad de Lecester, Inglaterra

    Directory of Open Access Journals (Sweden)

    Lasdum, Denis

    1969-05-01

    Full Text Available The main purpose of this social university building is to house the means of serving 2750 meals daily to the students and academic staff. Its enclosing structure consists of precast concrete elements, and the central nucleus is made with concrete cast at the site. It comprises ten floor levels, details of which are as follows. The basement mentains the kitchens and ancillary services. On the ground floor is the hall, snack-bar, library and offices. The second floor is occupied by the administrative offices and changing rooms. The third, fourth and fifth floors are entirely taken up with a self-service restaurant. On the sixth floor there is another restaurant, served by waiters. There is a senior room on the seventh floor. The next three floor levels are a vertical extension of the central nucleus, and the space is mainly devoted to a common hall. Finally, on the 11th floor, there are rooms for exhibitions, music recitals, and similar cultural activities.La misión principal de este edificio social universitario es la de poder servir en su interior 2.750 comidas diarias a estudiantes y personal académico. Tiene estructura perimetral a base de elementos prefabricados de hormigón, y el núcleo central está construido con hormigón armado realizado in situ. Se compone de diez plantas: El sótano contiene las cocinas y servicios anexos. En la planta baja se distribuyen el hall, snack-bar, biblioteca y oficinas. En el entresuelo están los guardarropas del edificio y oficinas administrativas. Las plantas 1.ª, 2.ª y 3.ª alojan un restaurante, que funciona en régimen de autoservicio. En la 4.ª planta hay otro restaurante, con servicio a la carta, atendido por camareros. La 5.ª planta alberga la sala «senior ». Las plantas 7.ª, 8.ª y 9.ª, prolongación vertical del núcleo central, tienen una sala común. Y, finalmente, en la planta 10.ª se celebran diversas manifestaciones : exposiciones, recitales de música, etcétera.

  11. Edificio, en Tel-Aviv

    Directory of Open Access Journals (Sweden)

    Solotov, Nahum

    1964-03-01

    Full Text Available This building is a clear example of the efforts now being made by the new generations of Israel architects to develop a national architecture, based principally on prefabrication, and running contrary to the classic moulds so deeply rooted in the Middle East, and also to the strong wave of American style modernism. Up to now, this is the tallest building in Tel-Aviv. It consists of vertical pillars at ground level, which branch out into Y shaped supports at the second floor. A large block of apartments rises above these. The outer walls consist of prefabricated concrete parts; there is also a large trellice structure, made up of concrete units, which supports a number of projecting fittings; these provide shade and facilitate ventilation. This type of fittings has proved very useful throughout Israel as a means of solving the basic problem of shade against the sun and suitable ventilation.Constituye un claro exponente de la lucha que sostiene la. nueva generación de arquitectos, formados en Israel, por crear una arquitectura nacional propia—basada principalmente en la prefabricación—, contraria a los moldes clasicistas tan arraigados en el Oriente Medio y a la gran ola de arquitectura americanizante. El edificio, el más alto construido hasta la fecha, en la zona central de Tel-Aviv, arranca en planta baja de unos pilares verticales, que se abren en la planta primera en forma de Y, para sustentar el bloque de apartamentos. Los cerramientos de fachada están construidos con piezas prefabricadas de hormigón; y una gran celosía constituida por bloques de hormigón, a los cuales van adosadas unas piezas salientes que dan sombra y facilitan la ventilación, resolviendo acertadamente este problema fundamental en toda la arquitectura del país.

  12. Ladrillos de edificios históricos de Toledo: caracterización, origen de las materias primas y aplicaciones para su conservación y restauración

    OpenAIRE

    López-Arce Martínez, Paula

    2004-01-01

    El objetivo principal de esta investigación es determinar las características estéticas (color y dimensiones), composicionales (mineralógica y temperatura de cocción original) y tecnológicas (propiedades físicas, hídricas y mecánicas) de ladrillos pertenecientes a edificios históricos de la ciudad de Toledo. El estudio se ha orientado hacia la selección de rutinas de caracterización más apropiadas para la restauración de edificios históricos. El conjunto de conocimientos obtenidos durante ...

  13. López Guzmán, Rafael; Gutiérrez Viñuales, Rodrigo (coords.). Alhambras: arquitectura neoárabe en Latinoamérica. Granada: Almed, 2016, 341 págs. Ilustr. ISBN: 978-84-15063-73-5

    OpenAIRE

    Juan Manuel Barrios Rozúa

    2017-01-01

    Con el libro Alhambras. Arquitectura neoárabe en Latinoamérica el lector se adentrará en el sugestivo mundo de la arquitectura orientalista que, inspirada en cualquier tipo de arquitectura musulmana, podemos encontrar en América. Ciertamente la Alhambra es el modelo más recurrente, pero abundan también los edificios que toman como referentes en mayor o menor medida la arquitectura otomana, egipcia, iraní o mogol, sin olvidar otros edificios de al-Andalus como la mezquita de Córdoba o la Giral...

  14. López Guzmán, Rafael; Gutiérrez Viñuales, Rodrigo (coords.. Alhambras: arquitectura neoárabe en Latinoamérica. Granada: Almed, 2016, 341 págs. Ilustr. ISBN: 978-84-15063-73-5

    Directory of Open Access Journals (Sweden)

    Juan Manuel Barrios Rozúa

    2017-06-01

    Full Text Available Con el libro Alhambras. Arquitectura neoárabe en Latinoamérica el lector se adentrará en el sugestivo mundo de la arquitectura orientalista que, inspirada en cualquier tipo de arquitectura musulmana, podemos encontrar en América. Ciertamente la Alhambra es el modelo más recurrente, pero abundan también los edificios que toman como referentes en mayor o menor medida la arquitectura otomana, egipcia, iraní o mogol, sin olvidar otros edificios de al-Andalus como la mezquita de Córdoba o la Giralda.

  15. Desarrollo de una herramienta para validar la influencia del comportamiento del usuario sobre la eficiencia energética en edificios públicos de oficinas.

    Directory of Open Access Journals (Sweden)

    Alción de las Pléyades Alonso Frank

    2016-12-01

    Full Text Available La problemática ambiental global conduce a que numerosos países incorporen estrategias de Eficiencia Energética (EE a fin de disminuir el consumo de energía, aspecto que valoran mediante etiquetados o pasaportes de EE. Como hipótesis se considera que los usuarios de edificios son responsables del consumo de energía no previsto en la etapa de funcionamiento, por lo que el objetivo del presente trabajo es desarrollar y validar una herramienta de valoración del comportamiento de usuarios de espacios de trabajo en edificios públicos de oficinas. Para ello, se lleva a cabo un trabajo de campo en tres edificios ubicados en la ciudad de San Juan, Argentina. Se realizan encuestas a fin de evaluar los hábitos que el usuario emplea como estrategias para satisfacer su condición de confort térmico, en correlación con los consumos de energía registrados. Se elabora un indicador del Nivel de Eficiencia del Usuario (NEU y se transfiere a una etiqueta, a efectos de obtener una rápida aprehensión por parte del mismo. Los resultados reflejan variaciones en la frecuencia de uso de artefactos de climatización, apertura de puertas y ventanas, control de parasoles y cortinas y modificación de la ropa por los usuarios, llegando a observarse variaciones del consumo energético del edificio. Los valores obtenidos del NEU, permiten demostrar la eficiencia del comportamiento de usuarios en relación al cuidado de la energía.

  16. Edificio de los Tribunales Municipales - Valle de San Gabriel, Los Ángeles - California (EE. UU.

    Directory of Open Access Journals (Sweden)

    Editorial, Equipo

    1976-04-01

    Full Text Available The most outstanding feature of this construction are the columns of the main facades which are formed by big prefabricated concrete members and which cover the entire height of the four story structure. The Southern facade is protected from the direct sunlight by means of long prefabricated vertical elements. The building is crowned with a large crobel which is supported by the columns. The space of the four storeys is distributed in the following manner: courtrooms, judges chambers and jury assembly; facilities for the district attorney, the public defender and the marshal; rooms for the court reporters; waiting rooms for the witnesses and premises for the accused. The general planning is such that the court rooms separate the private sector from the public one, at the same time as they are connected with the judges chambers and jury assembly. The interior features have a sober elegance in keeping with the function of the building. The construction is completed by a large parking space and gardens. OEl rasgo más sobresaliente de esta construcción son las columnatas de las fachadas principales, formadas por grandes elementos prefabricados de hormigón que cubren las cuatro plantas de altura del edificio. En la fachada sur, el peristilo se completa con largos partesoles verticales, también prefabricados, que protegen de la luz solar directa. En la parte superior el edificio culmina en un amplio voladizo apoyado sobre las grandes columnas. En el interior de las cuatro plantas se han distribuido: salas para los tribunales; dependencias destinadas a los jueces y jurados; locales para el fiscal, el abogado y el jefe de policía; salas para periodistas; salas de espera para los testigos, e instalaciones para los acusados. La organización general es tal que las salas de las audiencias separan la zona pública de la privada, quedando, al mismo tiempo, enlazadas con las salas de los jueces y de los jurados correspondientes. En la decoraci

  17. Un acercamiento a los valores patrimoniales del edificio de la Facultad de Ingeniería de la Universidad de Costa Rica

    Directory of Open Access Journals (Sweden)

    Rafael Ángel Venegas Arias

    2018-01-01

    Full Text Available Este ensayo es un acercamiento al edificio de la Facultad de Ingeniería en la Sede Rodrigo Facio Brenes de la Universidad de Costa Rica para su puesta en valor como patrimonio histórico-arquitectónico. Se hace una revisión histórica del inmueble y paralelamente se analizan distintos valores que pueden ser asignados al mismo, los cuales han sufrido un proceso de invisibilización. Los valores analizados en este ensayo son: simbólico, conjunto, objeto de diseño, documento histórico, espacio público y obra de arte; tomando en cuenta conceptos de política, historia, arquitectura e ideología. Para el desarrollo de este ensayo se utilizan los principios de la semiótica, abordando el edificio como un lenguaje que debe ser analizado e interpretado.

  18. Energy saving in buildings through the elimination of typical problems; Ahorro de energia electrica en edificios a traves de la eliminacion de problemas tipicos

    Energy Technology Data Exchange (ETDEWEB)

    Ramirez Rivero, Alex G [Genertek, S. A. de C. V., Mexico, D. F. (Mexico)

    1994-12-31

    The enormous electric energy consumption in buildings represents an important area of saving opportunities. The design of installations without advanced technical illumination criteria, the absence of standardization over energy efficiency, the lack of observation of the existing standards and guides, the continuous load growth in existing installations and the lack of appropriate maintenance, are some of the causes of the inefficient use of electric energy in buildings. Although the problems, and consequently the solutions, are exclusive for each unit, some of the former are frequently repeated. In this paper the problems found along more than 40 audits conducted in large buildings of different types in Mexico city are commented. [Espanol] El enorme consumo de energia electrica en edificios representa una importante area de oportunidad para ahorro. El diseno de instalaciones sin criterios luminotecnicos avanzados, la ausencia de normalizacion sobre eficiencia energetica, la falta de observancia de las normas y recomendaciones vigentes, el continuo crecimiento de carga en instalaciones existentes y la falta de mantenimiento adecuado son algunas de las causas del uso ineficiente de la energia electrica en inmuebles. Aunque los problemas y por tanto las soluciones son particulares para cada unidad, algunos de los primeros se repiten frecuentemente. En este trabajo se comentan los problemas encontrados a lo largo de mas de 40 auditorias realizadas a inmuebles grandes de diversos tipos en la ciudad de Mexico.

  19. Energy saving in buildings through the elimination of typical problems; Ahorro de energia electrica en edificios a traves de la eliminacion de problemas tipicos

    Energy Technology Data Exchange (ETDEWEB)

    Ramirez Rivero, Alex G. [Genertek, S. A. de C. V., Mexico, D. F. (Mexico)

    1993-12-31

    The enormous electric energy consumption in buildings represents an important area of saving opportunities. The design of installations without advanced technical illumination criteria, the absence of standardization over energy efficiency, the lack of observation of the existing standards and guides, the continuous load growth in existing installations and the lack of appropriate maintenance, are some of the causes of the inefficient use of electric energy in buildings. Although the problems, and consequently the solutions, are exclusive for each unit, some of the former are frequently repeated. In this paper the problems found along more than 40 audits conducted in large buildings of different types in Mexico city are commented. [Espanol] El enorme consumo de energia electrica en edificios representa una importante area de oportunidad para ahorro. El diseno de instalaciones sin criterios luminotecnicos avanzados, la ausencia de normalizacion sobre eficiencia energetica, la falta de observancia de las normas y recomendaciones vigentes, el continuo crecimiento de carga en instalaciones existentes y la falta de mantenimiento adecuado son algunas de las causas del uso ineficiente de la energia electrica en inmuebles. Aunque los problemas y por tanto las soluciones son particulares para cada unidad, algunos de los primeros se repiten frecuentemente. En este trabajo se comentan los problemas encontrados a lo largo de mas de 40 auditorias realizadas a inmuebles grandes de diversos tipos en la ciudad de Mexico.

  20. Unscented Kalman filter for SINS alignment

    Institute of Scientific and Technical Information of China (English)

    Zhou Zhanxin; Gao Yanan; Chen Jiabin

    2007-01-01

    In order to improve the filter accuracy for the nonlinear error model of strapdown inertial navigation system (SINS) alignment, Unscented Kalman Filter (UKF) is presented for simulation with stationary base and moving base of SINS alignment.Simulation results show the superior performance of this approach when compared with classical suboptimal techniques such as extended Kalman filter in cases of large initial misalignment.The UKF has good performance in case of small initial misalignment.

  1. Development and validation of the Single Item Narcissism Scale (SINS).

    Science.gov (United States)

    Konrath, Sara; Meier, Brian P; Bushman, Brad J

    2014-01-01

    The narcissistic personality is characterized by grandiosity, entitlement, and low empathy. This paper describes the development and validation of the Single Item Narcissism Scale (SINS). Although the use of longer instruments is superior in most circumstances, we recommend the SINS in some circumstances (e.g. under serious time constraints, online studies). In 11 independent studies (total N = 2,250), we demonstrate the SINS' psychometric properties. The SINS is significantly correlated with longer narcissism scales, but uncorrelated with self-esteem. It also has high test-retest reliability. We validate the SINS in a variety of samples (e.g., undergraduates, nationally representative adults), intrapersonal correlates (e.g., positive affect, depression), and interpersonal correlates (e.g., aggression, relationship quality, prosocial behavior). The SINS taps into the more fragile and less desirable components of narcissism. The SINS can be a useful tool for researchers, especially when it is important to measure narcissism with constraints preventing the use of longer measures.

  2. Development and Validation of the Single Item Narcissism Scale (SINS)

    Science.gov (United States)

    Konrath, Sara; Meier, Brian P.; Bushman, Brad J.

    2014-01-01

    Main Objectives The narcissistic personality is characterized by grandiosity, entitlement, and low empathy. This paper describes the development and validation of the Single Item Narcissism Scale (SINS). Although the use of longer instruments is superior in most circumstances, we recommend the SINS in some circumstances (e.g. under serious time constraints, online studies). Methods In 11 independent studies (total N = 2,250), we demonstrate the SINS' psychometric properties. Results The SINS is significantly correlated with longer narcissism scales, but uncorrelated with self-esteem. It also has high test-retest reliability. We validate the SINS in a variety of samples (e.g., undergraduates, nationally representative adults), intrapersonal correlates (e.g., positive affect, depression), and interpersonal correlates (e.g., aggression, relationship quality, prosocial behavior). The SINS taps into the more fragile and less desirable components of narcissism. Significance The SINS can be a useful tool for researchers, especially when it is important to measure narcissism with constraints preventing the use of longer measures. PMID:25093508

  3. Development and validation of the Single Item Narcissism Scale (SINS.

    Directory of Open Access Journals (Sweden)

    Sara Konrath

    Full Text Available MAIN OBJECTIVES: The narcissistic personality is characterized by grandiosity, entitlement, and low empathy. This paper describes the development and validation of the Single Item Narcissism Scale (SINS. Although the use of longer instruments is superior in most circumstances, we recommend the SINS in some circumstances (e.g. under serious time constraints, online studies. METHODS: In 11 independent studies (total N = 2,250, we demonstrate the SINS' psychometric properties. RESULTS: The SINS is significantly correlated with longer narcissism scales, but uncorrelated with self-esteem. It also has high test-retest reliability. We validate the SINS in a variety of samples (e.g., undergraduates, nationally representative adults, intrapersonal correlates (e.g., positive affect, depression, and interpersonal correlates (e.g., aggression, relationship quality, prosocial behavior. The SINS taps into the more fragile and less desirable components of narcissism. SIGNIFICANCE: The SINS can be a useful tool for researchers, especially when it is important to measure narcissism with constraints preventing the use of longer measures.

  4. Edificio de viviendas, en Madrid (España

    Directory of Open Access Journals (Sweden)

    Barbero Rebolledo, Manuel

    1966-09-01

    Full Text Available This is a housing block catering for medium income families. It includes eight different types of flats, but the most frequent one has a floor area of 120 m2, and comprises a living-dining room, three bedrooms, a service bedroom, kitchen, scullery, two bathrooms and several built in cupboards. The flats are wonderfully successful. Their interior decoration is adequate, the external walls are highly plastic, and very pleasantly coloured, and the balconies provide an interesting repetitive pattern motif.Destinado a viviendas de tipo medio, este edificio aloja ocho tipos de pisos; pero el prototipo más repetido tiene unos 120 m2; y su programa es de: living comedor, tres dormitorios principales y uno de servicio, cocina, despensa, ropero y dos cuartos de aseo. Las viviendas funcionan maravillosamente, su tratamiento interior es decoroso, adecuado, y la fachada principal del bloque es de una plástica notable, conseguida tan sólo con colores agradables y con la alternancia y forma de los balcones.

  5. Calvin’s modification of Augustine’s doctrine of original sin

    Directory of Open Access Journals (Sweden)

    N. Vorster

    2010-07-01

    Full Text Available Augustine was Calvin’s main source of reference in the “Insti- tutes”. However, his treatment of Augustine’s views was not uncritical. This article discusses the way in which Calvin modi- fied Augustine’s doctrine of original sin. The main differences can be attributed to different theological aims. Augustine deve- loped his doctrine of original sin against the teachings of the Manicheans and Pelagians, whereas Calvin shifted the focus to knowledge of God and the self. Calvin understood original sin noetically as religious and moral blindness – whereas Augus- tine viewed sexual concupiscence as the main principle of original sin. Augustine made a considerable effort to explain that sin does not find its origin in God. God foresaw the fall, but did not compel it. Calvin located sin in God’s eternal decree and permission. Augustine, furthermore, understood the transmis- sion of original sin biologically, whereas Calvin ascribed it to God’s eternal permissive will. These differences culminated in a different understanding of the meaning of Jesus’ virgin birth. The article concludes by discussing the relevance of Calvin’s noetic approach to original sin.

  6. Original antigenic sin: A comprehensive review.

    Science.gov (United States)

    Vatti, Anup; Monsalve, Diana M; Pacheco, Yovana; Chang, Christopher; Anaya, Juan-Manuel; Gershwin, M Eric

    2017-09-01

    The concept of "original antigenic sin" was first proposed by Thomas Francis, Jr. in 1960. This phenomenon has the potential to rewrite what we understand about how the immune system responds to infections and its mechanistic implications on how vaccines should be designed. Antigenic sin has been demonstrated to occur in several infectious diseases in both animals and humans, including human influenza infection and dengue fever. The basis of "original antigenic sin" requires immunological memory, and our immune system ability to autocorrect. In the context of viral infections, it is expected that if we are exposed to a native strain of a pathogen, we should be able to mount a secondary immune response on subsequent exposure to the same pathogen. "Original antigenic sin" will not contradict this well-established immunological process, as long as the subsequent infectious antigen is identical to the original one. But "original antigenic sin" implies that when the epitope varies slightly, then the immune system relies on memory of the earlier infection, rather than mount another primary or secondary response to the new epitope which would allow faster and stronger responses. The result is that the immunological response may be inadequate against the new strain, because the immune system does not adapt and instead relies on its memory to mount a response. In the case of vaccines, if we only immunize to a single strain or epitope, and if that strain/epitope changes over time, then the immune system is unable to mount an accurate secondary response. In addition, depending of the first viral exposure the secondary immune response can result in an antibody-dependent enhancement of the disease or at the opposite, it could induce anergy. Both of them triggering loss of pathogen control and inducing aberrant clinical consequences. Copyright © 2017 Elsevier Ltd. All rights reserved.

  7. En edificios de ayer, funciones de hoy. La vivienda: una constante histórica

    Directory of Open Access Journals (Sweden)

    Felipe Gallardo Gastelo

    2002-01-01

    Full Text Available La época contemporánea nos obliga a aprovechar el espacio urbano lo mejor posible. Es necesario evitar el crecimiento en extensión. Vale la pena, en cambio, utilizar en plenitud los edificios subutilizados. O inutilizados. El reciclaje de antiguas estructuras para inyectarles una función nueva es una opción legítima y conveniente. En la mayor parte de los casos, la vivienda –como origen o como destino– es el motivo central de las intervenciones arquitectónicas.

  8. Edificio para el Commerzbank AG - Dusseldorf - Alemania Federal

    Directory of Open Access Journals (Sweden)

    Schneider Esleben, P.

    1973-07-01

    Full Text Available The administrative centre of the Commerzbank AG is located in a building of rectangular plan, which consists of twelve stories, ground floor and underground for parking. The ground floor has been left as clear as possible in order to enable vehicles to reach the autobank counters. The upper floors contain the offices. The whole structure is built with concrete, formed by beams which are supported by rows of pillars which. In their turn, transmit the weight to the three unique supports of the ground floor. The facade is built with panels in which the windows are incorporated, and which are composed of two aluminium sheets and a filling of alveolar insulation, with a protection device against sunliglit on its interior part which consists of reflecting plastic laminas. The building is joined with tlie main administrative centre on the other side of the street by means of a suspended crossing, with steel cables, from the tower which was built for this purpose on one side of the new block and which shelters at the same time the centre of the vertical communication as well as the technical installations for ventilation.La sede administrativa del Commerzbank AG se ha dispuesto en un edificio de planta rectangular, constituido por doce plantas elevadas, baja y sótano de aparcamiento. La baja se dejó lo más diáfana posible para permitir el acceso de vehículos hasta las taquillas: autobanco. En las plantas superiores se han distribuido oficinas. Se empleó hormigón en la totalidad de la estructura, formada por vigas, apoyadas sobre filas de pilares, que a su vez transmiten las cargas a los tres únicos soportes de la planta baja. La fachada se ha realizado a base de paneles que llevan incorporadas las ventanas y están compuestos por dos láminas de aluminio y relleno de aislante alveolar, con un dispositivo de protección solar en su parte interior, que consiste en unas láminas reflectantes de plástico. El edificio está unido al centro

  9. La ley del reloj. Orígenes de la metáfora de la máquina en la arquitectura

    Directory of Open Access Journals (Sweden)

    Eduardo Prieto

    2015-07-01

    Full Text Available Los edificios no son máquinas. No lo son, desde luego, si se sigue la definición que da de ellas el Essai sur la composition des machines, el excelente manual publicado en 1808 por dos ingenieros españoles, Betancourt y Lanz, y que fue el primero de su género (Betancourt, 1808:5. Allí las máquinas se presentan como objetos que sirven para dirigir y regular una fuerza o, dicho con mayor sencillez, para producir un movimiento. A nadie se le oculta, sin embargo, que en la arquitectura no hay movimiento, y si lo hay es en un mero sentido figurado, como cuando se tratan los edificios como canales que distribuyen flujos o se incide en su capacidad para transformarse, o como cuando, simplemente, se pone el énfasis en los artefactos movibles que forman parte de ellos. En realidad, la distancia entre las máquinas y los edificios es tan grande que solo puede salvarse con metáforas impropias, pues ni la arquitectura se mueve ni las máquinas se habitan. Sin embargo, las máquinas no han dejado de tratarse como objetos análogos a los edificios y han mesmerizado a los arquitectos, que han creído ver en ellas no solo metáforas, sino modelos rigurosos de organización, cuando no objetos sublimes dignos de imitarse. ¿Qué explica su presencia recurrente en la teoría de la arquitectura de los últimos tres siglos?

  10. La cimentación del edificio histórico de la Fábrica de Tabacos de la Universidad de Sevilla

    Directory of Open Access Journals (Sweden)

    González García de Velasco, C.

    2011-03-01

    Full Text Available One of the main works to be developed by the University of Seville in the building of “La Fábrica de Tabacos” restoration, consists of an underground galleries net to pass by installations and other facilitites for the new uses of this historic building. To execute these galleries, we need to know the dimensions and typologies of the building foundations and also the history of its construction, because it could reveal us the possible existence of archaeological remains. This paper investigates, both through the building history and through some specific underground explorations, the knowledge of this building foundations and the real possibilities to carry out these galleries without archaeological incidences. The building sits on a land formerly depressed and later excavated to the full extent of the plant, and whose foundations were executed from below as walls and pillars, and being later all the plant filled to the ground level by providing current soil.

    Una de las principales obras a llevar a cabo en la rehabilitación del edificio de “La Fábrica de Tabacos” de la Universidad de Sevilla, es la ejecución de galerías subterráneas para el tendido de las instalaciones necesarias para sus nuevos usos. Para poder realizar estas galerías se necesita conocer las dimensiones y tipología de las cimentaciones del edificio, lo que nos podría desvelar la posibilidad de existencia de restos arqueológicos en el subsuelo. El objetivo del presente trabajo persigue, tanto a través del estudio de la historia del edificio como mediante prospecciones, conocer la tipología de sus cimentaciones para determinar las posibilidades físicas de ejecutar dichas galerías, y para deducir de ello la posible existencia de restos arqueológicos que pudieran afectar a las futuras obras a desarrollar por la Universidad de Sevilla. De todo ello se deduce que el edificio se asienta sobre un terreno antiguamente deprimido, que fue adem

  11. The super conservation energy building of the Ohbayashi corporation in Tokyo, Japan; El edificio super conservador de energia de la corporacion Ohbayashi en Tokio Japon

    Energy Technology Data Exchange (ETDEWEB)

    Ramirez Vargas, Ricardo [Instituto Tecnologico de La Laguna, La Laguna (Mexico)

    1994-12-31

    The main building of the Institute of Technical Investigation of Ohbayashi Corporation in Tokyo, Japan, was built with the objective of being the best all over the world in the grounds of energy conservation. The utilization of this building was initiated on April 15, 1982 registering an annual energy consumption in the first two years of 87 and 96 Million calories/m{sup 2} respectively, that is, less than one fourth the consumption in conventional buildings. The inside ambient is better or equal to the one of ordinary buildings and the time for the investment recuperation was estimated of 8.7 years. The classification for the energy consumption in those first two years was of 31% for air conditioning, 41% for lighting/wall receptacles and 25% for others. The maximum consumption was in the month of August and was of 10 to 11 Mcal/m{sup 2}. The minimum consumption corresponded to the month of November and was 6 to 7 Mcal/m{sup 2}. In 1984 this building won the prize Energy of the ASHRAE. A total od 98 conservation measures were adopted for its construction and operation. [Espanol] El principal edificio del Instituto de Investigacion Tecnica de la corporacion Ohbayashi en Tokio, Japon, fue construido con el objetivo de ser el mejor en el mundo en el terreno de la conservacion de energia. La utilizacion de este edificio comenzo el 15 de abril de 1982, registrando un consumo anual de energia en los dos primeros anos de 87 y 96 Mcal/m{sup 2} respectivamente, esto es, menos de un cuarto del consumo en edificios convencionales. El ambiente interno es mejor o igual que el de edificios ordinarios y el tiempo de recuperacion de la inversion se estimo en 8.7 anos. La clasificacion en el consumo de energia para esos dos primeros anos fue de 31% para el acondicionamiento de aire, 41% para la iluminacion/contactos y 25% para otros. El maximo consumo aparecio en el mes de agosto y fue de 10 a 11 Mcal/m{sup 2}. El minimo consumo correspondio al mes de noviembre fue de 6 a 7 Mcal

  12. Edificio de viviendas, en Madrid

    Directory of Open Access Journals (Sweden)

    Azpiazu Ordóñez, José Ramón

    1965-12-01

    Full Text Available This building has a basement, four storeys and an attic. In the basement there is a private garage, air conditioning equipment, fuel and refuse stores, and private lockers for the various apartments. The ground floor has two dwellings and the open entrance, where there is a receptionist's desk and the post boxes. The other floors have two dwellings, each of 220 m2 area, and another of 440 m2. The attic has two small outbuildings, each of them containing a large room, or studio. This building has been lavishly designed, and space distribution is carefully planned. The interplay of volumes, and charming overall design give this project a distinctive and attractive quality.Consta de sótano, planta baja, tres plantas de pisos y ático. La planta de sótano aloja: el garaje particular de la casa, las instalaciones de aire acondicionado, almacén de carburantes, almacén de basuras y trasteros para cada vivienda o estudio. La planta baja comprende: dos viviendas y el zaguán, en el cual hay un mostrador para la conserjería y los casilleros postales. La planta tipo consta de dos viviendas: una de 220 m2 y otra de 440 m2. Y, finalmente, la planta de ático se compone de dos torreones destinados a estudios. El edificio es de una gran riqueza de tratamiento y espacio, cual corresponde a viviendas nobles. La distribución acertada y la graciosa y movida composición volumétrica le imprimen un sello característico y distintivo.

  13. Transpondo muros: Escritas da violência na República Democrática Alemã

    Directory of Open Access Journals (Sweden)

    Elcio Loureiro Cornelsen

    2009-06-01

    Full Text Available O objetivo do presente artigo é esboçar, a partir da interpretação das obras “Zeit-Zeugen”. Inhaftiert in Berlin-Hohenschönhausen (1996, organizada por Gabriele Camphausen, Folterzelle 36 Berlin-Pankow. Erlebnisbericht einer Stasihaft (1993, de Timo Zilli, Ein guter Kampf. Fakten, Daten, Erinnerungen 1945-1954 (1998 do político Ewald Ernst, Die Stasi war mein Eckermann: oder mein Leben mit der Wanze (1991, do escritor Erich Loest, e Geboren am 13. August. Der Sozialismus und ich (2004, do jornalista Jens Bisky, um breve estudo sobre as diversas formas e fases da violência enquanto instrumento de poder, praticada pelo Estado do SED na República Democrática Alemã nos 40 anos de sua existência, e discutir especialmente alguns aspectos teóricos sobre o conceito de “literatura de testemunho”. Os cinco relatos analisados, de caráter memorialista e autobiográfico, se pautam por um tom decididamente crítico frente aos desmandos num Estado totalitário. “Transpor muros” nos 20 anos após a Queda do Muro de Berlim, desse ponto de vista, implica um olhar memorialista de denúncia contra o esquecimento frente a um passado traumático.

  14. THE HEIDELBERG CATECHISM ON HUMAN SIN AND MISERY

    African Journals Online (AJOL)

    Produced by SUN MeDIA Bloemfontein .... invites us to look at sin in terms of our fundamental alienation from God. And if sin-talk is therefore ..... the social structures created by the human race, but that we nevertheless have a measure of free ...

  15. Una visión holística de la reducción del impacto ambiental en edificios del área del Mediterráneo

    Directory of Open Access Journals (Sweden)

    Sabaté, J.

    2011-10-01

    Full Text Available LIMA, Low Impact Mediterranean Architecture, is an initiative that aims to demonstrate the technical feasibility and economic viability of drastically reducing the environmental impact of buildings in countries with warm climates. The initiative is applicable to both new construction and torefurbishment and leads to improvements in comfort and indoor quality. The holistic vision of the environmental impact presented here contemplates notonly the energy consumed in use but also the energy and water used in the complete life cycle of the building, including the energy embodied in the materials, as well as aspects relating to health and comfort. The verification methodology is based on the definition and the analysis of atypical, reference, block of flats, the actual construction of a prototype representative of a substitution of one flat within this reference block,and the monitoring and analysis of this prototype in standard conditions and also when actually occupied.

    LIMA, Low Impact Mediterranean Architecture, es una iniciativa que pretende demostrar la viabilidad tecnológica y económica de reducir drásticamente el impacto ambiental de las edificaciones en países de climas cálidos, aplicable tanto a obra nueva como a rehabilitación, mejorando al mismo tiempo su confort y habitabilidad. La visión holística del impacto ambiental aquí presentada incluye no solo el consumo de energía en la fase de uso del edificio, sino también la energía incorporada en los materiales de construcción en todo el ciclo de vida del edificio así como el ciclo del agua y aspectos de salud y confort. La metodología de verificación se basa en la definición y análisis de un edificio colectivo representativo y la construcción de un prototipo, parte ficticia del edificio total, para su análisis y monitorización, tanto en condiciones estandarizadas, como reales de uso.

  16. Intercambios convectivos en el interior de los edificios

    Directory of Open Access Journals (Sweden)

    Roset, J.

    1987-12-01

    Full Text Available Convection inside buildings is the main mechanism to explain heat transfer among its parts. The numerical model, we use in this work, is bidimensional with the heat flux in laminar regime. We simule different thermal conditions of a room with one of its walls having several non-uniform distributions of temperature. We obtain, for these configurations, the heat fluxes through the different parts of the wall and the final distribution of the temperatures inside the whole room.

    La convección en el interior de los edificios es el principal mecanismo de transferencia de calor entre las partes de los mismos. El modelo numérico que se utiliza en este trabajo es bidimensional con el flujo de calor en régimen laminan Se simulan diferentes condiciones térmicas de un cerramiento con la hipótesis de que una de sus paredes es sometida a varias distribuciones de temperatura no uniformes. Se obtienen, para estas configuraciones, los flujos de calor en las distintas partes de la pared así como la distribución final de temperaturas en el interior de toda la habitación.

  17. Escritura proyectada y proyectable en los muros de los museos: propuesta de análisis desde la ciencia de la información

    Directory of Open Access Journals (Sweden)

    Celso

    2018-01-01

    Full Text Available El ser humano, desde su etapa primitiva, se dedicó a buscar formas de supervivencia, pero también a la observación y a la contemplación. Creó, y lo continúa haciendo, imágenes de su entorno y de sus actividades cotidianas. En esta investigación nos proponemos como objetivo identificar las formas y los objetos requeridos para la presentación de la escritura en los muros de los museos. Para ello se presenta un estudio descriptivo de primera aproximación, cuyo procedimiento fue la investigación documental y el estudio de campo en 193 museos o galerías de arte distribuidas en México (Ciudad de México, España (Madrid, Bilbao, Zaragoza y Francia (París en el periodo enero de 2011-junio de 2017. Después de la localización de 12 piezas de arte, se procedió a su análisis y a la redacción de los resultados y las conclusiones. Una de las derivaciones por las visitas e indagatorias en algunos museos es que se utilizan ciertas herramientas para la proyección de piezas de arte en los muros: cámaras de vigilancia, proyectores conectados a computadoras y proyectores de transparencias. Se concluye entonces que la elaboración de imágenes o artefactos artísticos para el recogimiento del género humano no es reciente, tiene larga data, los hubo en las cavernas y los hay en los museos. Las piezas de manufactura para la exhibición y proyección en los museos contienen muestras escriturales, además de imágenes.

  18. The ethics of sin taxes.

    Science.gov (United States)

    Green, Rebecca

    2011-01-01

    ABSTRACT The current global economic crisis is forcing governments to consider a variety of methods to generate funds for infrastructure. In the United States, smoking-related illness and an obesity epidemic are forcing public health institutions to consider a variety of methods to influence health behaviors of entire target groups. In this paper, the author uses a public health nursing model, the Public Health Code of Ethics (Public Health Leadership Society, 2002), the American Nurses' Association (ANA) Code of Ethics (2001), and other relevant ethical theory to weigh and balance the arguments for and against the use of sin taxes. A position advocating the limited use of sin taxes is supported as a reasonable stance for the public health professional. © 2010 Wiley Periodicals, Inc.

  19. Original antigenic sin responses to influenza viruses.

    Science.gov (United States)

    Kim, Jin Hyang; Skountzou, Ioanna; Compans, Richard; Jacob, Joshy

    2009-09-01

    Most immune responses follow Burnet's rule in that Ag recruits specific lymphocytes from a large repertoire and induces them to proliferate and differentiate into effector cells. However, the phenomenon of "original antigenic sin" stands out as a paradox to Burnet's rule of B cell engagement. Humans, upon infection with a novel influenza strain, produce Abs against older viral strains at the expense of responses to novel, protective antigenic determinants. This exacerbates the severity of the current infection. This blind spot of the immune system and the redirection of responses to the "original Ag" rather than to novel epitopes were described fifty years ago. Recent reports have questioned the existence of this phenomenon. Hence, we revisited this issue to determine the extent to which original antigenic sin is induced by variant influenza viruses. Using two related strains of influenza A virus, we show that original antigenic sin leads to a significant decrease in development of protective immunity and recall responses to the second virus. In addition, we show that sequential infection of mice with two live influenza virus strains leads to almost exclusive Ab responses to the first viral strain, suggesting that original antigenic sin could be a potential strategy by which variant influenza viruses subvert the immune system.

  20. Agencia de la Banca Sud-americana del Brasil, S.A. en Capivari

    Directory of Open Access Journals (Sweden)

    Levi, Primo

    1963-09-01

    Full Text Available This building has two blocks, one for the Banks' installations and the other is the manager's house. The building has a concrete and steel compound structure. The walls are brick, the flooring is a reinforced concrete slab and hollow bricks, and the roof consists of corrugated fibrocement sheeting. The bank block walls have been faced, both internally and externally, with cement tiles, 15 x 15 cms in size, of the same type that are employed for the flooring. The design is grey on white background. The ceiling of the bank hall is fitted with acoustical material (2.5 cms of glass wool on Duralex perforated slabs, to reduce reverberation. This measure was necessary because of the relatively large height of the hall. The walls are cylindrically curved and have a smooth and hard surface.El edificio consta de dos cuerpos: uno para las instalaciones de la Banca, y el otro para la vivienda del gerente. La estructura es mixta, a base de hormigón armado y acero; los muros, de ladrillo; el techo, ejecutado en losa de hormigón armado y ladrillos huecos, y la cubierta es de flbrocemento ondulado. Los muros de los cuerpos de la Banca han sido revestidos, interior y exteriormente, con baldosas de cemento, de 15x15 cm, del tipo empleado para el suelo. El dibujo es gris sobre fondo blanco. El techo de la sala de la Banca va acondicionado con material acústico (a base de 2,5 cm de lana de vidrio sobre placas perforadas de Duralex para reducir la reverberación. Esta medida venía impuesta dada la altura relativamente grande y los muros en curva revestidos de material liso y duro.

  1. Rehabilitación y reforma estructural de edificios antiguos

    Directory of Open Access Journals (Sweden)

    Buzón, Rafael

    1982-03-01

    Full Text Available Not available.Las Ordenanzas Municipales de la mayor parte de las ciudades exigen que se respeten las edificaciones con cierto carácter tradicional o histórico, rehabilitándolas o reconstruyéndolas, con la obligación de conservar íntegramente las fachadas en su mismo aspecto arquitectónico. Un porcentaje importante del volumen futuro de construcción estará dirigido a estos edificios. Barrios enteros edificados en una misma época con características constructivas similares, se encuentran en igual grado de deterioro o envejecimiento por el transcurso de los años, con un estado resistente precario, precisando de una pronta rehabilitación, si se quiere evitar el desalojo masivo y la pérdida irreversible de los inmuebles. Se hace preciso conocer la técnica utilizada, el comportamiento de los materiales, los daños más frecuentes, por vicio o envejecimiento y la práctica de reparación eficaz para abordar este campo olvidado de la construcción.

  2. Edificio deportivo en Ludwigshafen, Alemania

    Directory of Open Access Journals (Sweden)

    Rainer, R.

    1968-10-01

    Full Text Available The project built at the Ebert Park occupies a rectangular site. A main feature of its central nucleus is a square hall, of 60 by 60 m area, which can house 2400 seated spectators. The shell roof of this ball is outstanding. It is a hyperbolic parabolid, which covers a large area with a minimum of material. Another noteworthy feature is the strong and harmonious design of this hall, which consists essentially of a monolithic rcjof, made of precast parts, and a powerful prestressed boundary girder resting oh piles, which take up the vertical loads, whilst a great prestressed concrete, tie member, of 110 m length, reacts the horizontal thrust component of the roof loads.El conjunto, edificado en el parque Ebert, ocupa una superficie rectangular en planta. En su núcleo central está ubicado el pabellón principal, de planta cuadrada (60x60 m y con capacidad para albergar 3.400 espectadores sentados. Resalta en este conjunto la cubierta del tipo laminar de dicho pabellón, con forma de «paraboloide hiperbólico», que resuelve acertadamente el problema de la cobertura de un gran espacio con un mínimo de material. Destacaremos igualmente la plástica recia y armónica del edificio, su calidad y textura y el sistema constructivo adoptado, que consiste esencialmente en una cubierta monolítica —a base de elementos prefabricados—, las poderosas vigas de borde, pretensadas, y la cimentación de pilotes que absorben la componente vertical de empujes, dejando al gran tirante inferior, de 110 m y hormigón pretensado, la misión de contrarrestar la componente horizontal del empuje transmitido por la cubierta.

  3. Early Christian spiritualties of sin and forgiveness according to 1 John

    Directory of Open Access Journals (Sweden)

    Dirk G. van der Merwe

    2014-05-01

    Full Text Available The article attempts to investigate the possible lived experiences created by this text. The text revolves around the experience of fellowship with God (1:6, 7 who is characterised as ‘light’. For the author of 1 John, sin disrupts this fellowship. He creates an awareness and a ‘spirituality of sin and guilt’ in the lives of his readers through the use of the experiential metaphor of darkness in a dialectic combination with light and the two false negations ‘do not have sin’ (sin as a noun and ‘do not sin’ (sin as a verb. This fellowship is re-established through living in the light: the confession, forgiveness and expiation of sin. The author creates a spirituality of confession, forgiveness and expiation of sin through descriptive cultic (blood of Jesus and expiation, forensic (paraclete, atypical (cleans, expiation, paraclete and all-inclusive (all [twice], whole, anyone language. Thus, in his rhetoric, the author uses metaphor, dialectic, sacrificial, forensic, atypical and all-inclusive language to facilitate a variety of ‘lived experiences’ within his readers. Firstly, he wants them to feel guilty about their sins and consequently, after they have confessed their sins, to strengthen their faith. Secondly, he wants to encourage them to believe that they can experience the forgiveness of their sins and, by doing so, know that they have eternal life (5:13 and can experience fellowship with God and, mutually, with one another.

  4. SINS/CNS Nonlinear Integrated Navigation Algorithm for Hypersonic Vehicle

    Directory of Open Access Journals (Sweden)

    Yong-jun Yu

    2015-01-01

    Full Text Available Celestial Navigation System (CNS has characteristics of accurate orientation and strong autonomy and has been widely used in Hypersonic Vehicle. Since the CNS location and orientation mainly depend upon the inertial reference that contains errors caused by gyro drifts and other error factors, traditional Strap-down Inertial Navigation System (SINS/CNS positioning algorithm setting the position error between SINS and CNS as measurement is not effective. The model of altitude azimuth, platform error angles, and horizontal position is designed, and the SINS/CNS tightly integrated algorithm is designed, in which CNS altitude azimuth is set as measurement information. GPF (Gaussian particle filter is introduced to solve the problem of nonlinear filtering. The results of simulation show that the precision of SINS/CNS algorithm which reaches 130 m using three stars is improved effectively.

  5. Ensayo en Lima (Perú de edificio de adobe sismorresistente construido con el sistema de albañilería integral

    Directory of Open Access Journals (Sweden)

    Vega, S.

    2009-09-01

    de mortero. Se hace necesario que las armaduras transmitan los esfuerzos entre sí. Las armaduras, en forma de cercha, se pueden cruzar en las tres direcciones del espacio, lo que permite la construcción de muros y forjados. De esta manera sólo se necesita un posterior relleno con bloques de adobe o el tablero del forjado para que el conjunto tenga la rigidez suficiente. Para verificar la seguridad de este nuevo tipo de edificación para su construcción en zonas sísmicas del tercer mundo, se ha ensayado a sismo un prototipo realizado con el sistema SAI con adobe, de 6x6x6 m y dos plantas a escala 1/2 en la PUCP (Pontificia Católica Universidad del Perú de Lima en colaboración con la UPM (Universidad Politécnica de Madrid. Los resultados de este ensayo muestran que el SAI con adobe permanece estable sin grietas significativas ante un sismo severo de 130 mm de desplazamiento (equivalente a un sismo de 10º en la escala de Richter.

  6. Escuela para señoritas, Inglaterra

    Directory of Open Access Journals (Sweden)

    Stillman y Eastwlck-Field, Arquitectos

    1963-02-01

    Full Text Available The object was to design part of a new building which had been seriously damaged during the war, so that the old and new parts would blend into a pleasant whole, with a capacity for 600 girls. The new designs avoid the glass box style of school buildings, and glass walls have been adopted only on the ground floor, thus giving an impression of light and airiness to what used to be a partial basement. Classrooms have been designed in a simple manner, and give the impression of conventional rooms. Simple lines and materials have been chosen throughout. Strong contrasts in the external finish have been avoided, and colours provide a relaxing background to the intensive activities of the students. A constructional feature is the use of prefabricated concrete joists and supports. Outer walls consist of brick panels filling in the space between the visible concrete framework. Ceilings are of insulating boards, and the floors are covered with linoleum. Special attention has been devoted to the hall. In this case the roof is of white gypsum, and the only features are the grills covering the fluorescent lighting. The walls of this hall are of glass, and are covered with heavy velvet curtains. A balcony with hardwood posts adds a simple and friendly feature to the building. The furniture and drapery have been carefully chosen. Camden school has a rigid tradition of individualism and fine education, and the new building has succeeded in maintaining the exclusive quality of the older parts, as well as offering an overall impression of up to date construction.El problema consistía en proyectar un nuevo núcleo para un edificio que había sido seriamente bombardeado durante la guerra, de tal modo que las partes antiguas y nuevas formasen un conjunto agradable y con capacidad para más de 600 chicas. En la nueva construcción se ha evitado el carácter de «cajas de cristal» de las nuevas escuelas ordinarias y se han empleado muros de cristal solamente en la

  7. Edificio para la nueva sede social de la empresa nacional de electricidad, S. A. Madrid/España

    Directory of Open Access Journals (Sweden)

    Población, Eleuterio

    1986-04-01

    Full Text Available In this work, the design and execution of ENDESA building, in Madrid, is fully described. It is a compound of a twelve-storeyed and a two-storeyed buildings, separated by a garden. Being placed in a central district, a special adaptation to the bylaws was necessary concerning the volume and use conditions. Among its most remarkable characteristics it could be pointed out the subjection to a modular frame, the adequacy of the spaces for the activities that are to be developped in it and the adopted solutions for its closure.En el presente artículo se describe detalladamente el proyecto y ejecución del edificio ENDESA, en Madrid, compuesto por dos edificios de doce alturas uno, y dos el otro, unido por un espacio ajardinado. En céntrica situación ha exigido una especial adaptación a las Ordenanzas Municipales en cuanto a condiciones de volumen y uso. Entre sus características más notables pueden señalarse IQ sujeción a una red modular, la adecuación del espacio a las actividades que en él se desarrollarán y las soluciones adoptadas para su cerramiento.

  8. Sin Nombre

    DEFF Research Database (Denmark)

    Cristoffanini, Pablo Rolando

    2012-01-01

    steder, de aldrig har stiftet bekendtskab med. Og når man besøger stederne i virkeligheden, vil filmenes typer og stereotyper påvirke mødet og kontakten. I denne artikel vil jeg vise, hvordan en film, Sin nombre (spansk: Uden navn), behandler to af den globaliserede verdens grundlæggende spørgsmål: a...... kun vedkommende, fordi den tager vigtige samfundsmæssige og eksistentielle spørgsmål op, men også fordi den, som kritikerne har påpeget, rent æstetisk er af høj kvalitet. Farver, lyd og de intense scener støtter en god fortælling....

  9. Documento de Idoneidad Técnica, Granulite CD.U.: 693621 S.F.B. Un 6 - Convalidación n.° 5 Agrément del C.S.T.B. n."2.117 Fecha: 28 de julio de 1965 - revestimiento interior de muros

    Directory of Open Access Journals (Sweden)

    Nadal, J.

    1965-10-01

    Full Text Available Not availableEl revestimiento interior de muros GRANULITE se obtiene por aplicación, sobre la superficie a revestir, de una capa de pasta compuesta de un árido mineral y de im conglomerante constituido por una emulsión acuosa de resina sintética.

  10. Misattribution, false recognition and the sins of memory.

    OpenAIRE

    Schacter, D L; Dodson, C S

    2001-01-01

    Memory is sometimes a troublemaker. Schacter has classified memory's transgressions into seven fundamental 'sins': transience, absent-mindedness, blocking, misattribution, suggestibility, bias and persistence. This paper focuses on one memory sin, misattribution, that is implicated in false or illusory recognition of episodes that never occurred. We present data from cognitive, neuropsychological and neuroimaging studies that illuminate aspects of misattribution and false recognition. We firs...

  11. Domogis: prototipo de un interfaz del sistema de control de un edificio integrado en un SIG

    Directory of Open Access Journals (Sweden)

    Álvarez, M.

    2010-06-01

    Full Text Available This paper deals with of a the use of Geographical Information Systems (GIS for domotic control. The foccus is put on the communication interface between the building control system (BCS integrated in a GIS. For get this aim, the GIS of the Montegancedo Campus where is located the Facultad de infomatica of UPM and the creation of an interface is needed. The implemented interface in Microsoft C# language allows the control, monotorizing and management of the sensors data installated in the Campus.

    Este trabajo trata de la utilización de los Sistemas de Información Geográfica (SIG en uno de las nuevos requerimientos de la arquitectura, el control domótico. El objetivo es el desarrollo de un interfaz de comunicación del Sistema de Control de un Edificio (SCE integrado en un SIG. La consecución de este objetivo implica previamente el desarrollo del SIG del Campus de Montegancedo sede de la Facultad de Informática de la UPM y la creación de un interfaz integrado en el SIG, desarrollado en lenguaje de programacion C# de Microsoft. Este interfaz dirige al usuario en la realización de ciertas tareas de control domótico de las instalaciones urbanas y edificios del Campus universitario, como evaluar, monotorizar y gestionar datos procedentes de sensores estratégicamente situados en dicho Campus.

  12. Thermal responses and its relation with the building outdoor conditions; Respuestas termicas y su relacion con la envolvente del edificio

    Energy Technology Data Exchange (ETDEWEB)

    Marincic, Irene [Universidad de Sonora, Hermosillo, Sonora (Mexico); Isalgue, Antoni [Universidad Politecnica de Cataluna, Barcelona (Spain)

    2000-07-01

    In order to understand and to control the indoor thermal behavior in buildings, it is necessary to know the origin of the energies coming into and outside the building, identifying the geometric factors and physical properties, that can modify the thermal balance of the system. In this work, we analyze the thermal behavior of a building experimentally, related with its exterior conditions. Specifically, we analyze the thermal response indoors at different distances from the building envelope, which implies different thermal insulation situations. Supported on temperature measurements in a residential building, which is representative of local construction styles (adjacent other buildings), we analyze the thermal response effects depending on the distances between the considered points and the envelope and on the insulation between both. Applying a methodology based on experimental transfer functions of buildings, the thermal behavior in the temporary and frequency domains is evaluated. With this methodology, it is possible to visualize certain phenomena and to obtain thermal parameters that characterize the dynamic aspects of the thermal response. The main scope is to extract information from the building analysis, in order to extrapolate the behavior conclusions to a proper thermal design of similar constructions. From the thermal responses analysis at different spatial localization, we conclude that the distance from the building envelope (and also its properties) has a great influence on thermal inertia effects, which can modify importantly the thermal response. This phenomena has a parallelism with the skin effect of the magnetic fields penetration in conductors. The spatial localization implies a certain thermal mass involved in each case, which controls the penetration of exterior thermal oscillation. [Spanish] Para poder entender y controlar los comportamientos termicos en el interior de los edificios, es necesario conocer el origen de las energias que

  13. Edificio de oficinas para el Sacramento Municipal Utility District – Smud

    Directory of Open Access Journals (Sweden)

    Dreyfuss & Blackford, Arquitectos

    1963-03-01

    Full Text Available This building takes advantage of the uneveness of the ground, and seeks to enhance the attractiveness of the landscape. It includes a cafeteria, an auditorium for 190 persons, exhibition hall, space for the various departments, and other facilities. Allowance has been made for a 30% increase in the staff. One floor level has been constructed, but is not fully completed, and there is the possibility of adding another one. There is parking space for 720 automobiles. The glass walls are specially fitted with a protection, whereby the sun does not shine on the office tables. The external colour of the building changes continuously, for the aluminium reflects or absorbs the sun, depending on the time of day and the season of the year: this colour changes from bronze to quartz tone, under the effect of the sun, and from white to grey in the shade. The green turf emphasizes the delicate tones of the building. The basic requirements have been satisfied by means of a beautiful and harmonious design, which constitutes an altogether important architectural unit.Ha sido construido aprovechando los desniveles del ter reno para crear un paisaje interesante. Dispone de: cafetería, auditorio para 190 personas, sala de exposición, espacios para los distintos departamentos, etc. Se ha previsto pueda servir para un aumento de un 30% de empleados, existiendo una planta construida, pero no acabada, y la posibilidad de construir otra. Estacionamiento con capacidad para 720 coches. Toda la zona acristalada está protegida mediante dispositivos que impiden a los rayos solares incidir sobre las mesas de trabajo. El color exterior del edificio cambia continuamente, ya que el aluminio refleja o absorbe el sol, según las horas del día o la época del año, pasando de un tono bronceado a un blanco cuarcífero. En la sombra, del blanco al gris. Las fajas verdes de césped destacan la brillante delicadeza de las paredes. En forma bella y armoniosa han sido satisfechas las

  14. Loss of the SIN3 transcriptional corepressor results in aberrant mitochondrial function

    Directory of Open Access Journals (Sweden)

    Hüttemann Maik

    2010-07-01

    Full Text Available Abstract Background SIN3 is a transcriptional repressor protein known to regulate many genes, including a number of those that encode mitochondrial components. Results By monitoring RNA levels, we find that loss of SIN3 in Drosophila cultured cells results in up-regulation of not only nuclear encoded mitochondrial genes, but also those encoded by the mitochondrial genome. The up-regulation of gene expression is accompanied by a perturbation in ATP levels in SIN3-deficient cells, suggesting that the changes in mitochondrial gene expression result in altered mitochondrial activity. In support of the hypothesis that SIN3 is necessary for normal mitochondrial function, yeast sin3 null mutants exhibit very poor growth on non-fermentable carbon sources and show lower levels of ATP and reduced respiration rates. Conclusions The findings that both yeast and Drosophila SIN3 affect mitochondrial activity suggest an evolutionarily conserved role for SIN3 in the control of cellular energy production.

  15. “estudio y simulación energética del edificio de la fiec con energyplus”

    OpenAIRE

    Briceño Maldonado, Richard Manuel

    2013-01-01

    En este documento se presenta el estudio energético y análisis de cargas térmicas del edificio de la Facultad de Ingeniería en Electricidad y Computación. El objetivo principal es realizar recomendaciones para disminuir la demanda de energía eléctrica debido a la excesiva carga térmica generada por los lucernarios de policarbonato alveolar. Se analizaron varias herramientas informáticas, y mediante matriz de decisión, se escogió a la denomina EnergyPlus. Se realizaron seis comparaciones a tra...

  16. Rehabilitación de edificios bajo objetivos de reducción de impacto ambiental: un caso piloto de vivienda plurifamiliar en el área de Playa de Palma, Mallorca

    Directory of Open Access Journals (Sweden)

    Wadel, G.

    2011-10-01

    Full Text Available This article presents briefly the work Pilot study to reduce environmental impact: evaluation and assessment of a sustainable refurbishment of an existing residential building in Playa de Palma carried out by the Consortium of Palma Beach. It will be explained by how the environmental impacts of the building can be reduced by 50% or more as a result of future refurbishment and subsequent management, referring to both its current situation and refurbishment standards in residential buildings. It also includes an approximated evaluation of the CO2 emission reduction achieved in the building life cycle and the projected costs for the various actions of the refurbishment model proposed by the Consortium, to be carried out in other renovation operations in Palma Beach.

    Este artículo resume el estudio Experiencia piloto para la reducción del impacto ambiental: evaluación y asesoramiento a la rehabilitación sostenible de un edificio de viviendas existente en Playa de Palma realizado para el Consorci de Platja de Palma. Se explica a través de qué medidas es posible reducir en un 50% o más los impactos ambientales del edificio como producto de su futura rehabilitación y posterior gestión respecto tanto de su situación actual como de los estándares de rehabilitación al uso en edificios de vivienda. Asimismo, se incluye también una aproximación a las reducciones de emisiones de CO2 que se consiguen en el ciclo de vida del edificio y a los costes previstos para las distintas actuaciones del modelo de rehabilitación que el citado consorcio propone para las operaciones de rehabilitación a llevarse adelante en Playa de Palma.

  17. The seven sins of memory. Insights from psychology and cognitive neuroscience.

    Science.gov (United States)

    Schacter, D L

    1999-03-01

    Though often reliable, human memory is also fallible. This article examines how and why memory can get us into trouble. It is suggested that memory's misdeeds can be classified into 7 basic "sins": transience, absentmindedness, blocking, misattribution, suggestibility, bias, and persistence. The first three sins involve different types of forgetting, the next three refer to different types of distortions, and the final sin concerns intrusive recollections that are difficult to forget. Evidence is reviewed concerning each of the 7 sins from relevant sectors of psychology (cognitive, social, and clinical) and from cognitive neuroscience studies that include patients with focal brain damage or make use of recently developed neuroimaging techniques. Although the 7 sins may appear to reflect flaws in system design, it is argued instead that they are by-products of otherwise adaptive features of memory.

  18. Energy saving in office buildings through cheap bioclimatic design measures; Ahorro de energia en edificios de oficinas a partir de medidas de diseno bioclimatico de bajo costo

    Energy Technology Data Exchange (ETDEWEB)

    Garcia Chavez, Jose Roberto [Universidad Autonoma Metropolitana, Unidad Azcapotzalco (Mexico)

    2007-01-15

    This article shows the study performed in a building of Campus Uni dad Azcapotzalco in order to evaluate some bioclimatic design strategies. And to reach the higrothermic comfort and the appropriate lighting to favor employees to increase their performance in work activities. There are some strategies in order to solve this problem: the skylight area reduction, existing lights change, ventilation increase, fixed partition door implementation, etc. The obtained outcomes make possible the beginning of bioclimatic design use to save energy in other buildings, because sometimes edifications possess a design that cause the energy waste. [Spanish] En este articulo se muestra el estudio que se hizo en un edificio en el Campus Unidad Azcapotzalco, el fin de esta labor es evaluar ciertas estrategias de diseno bioclimatico para que las personas que operan en este edificio puedan tener confort higrotermico y una iluminacion pertinente, que den como resultado un mejor desempeno en las tareas que realizan. Algunas de las estrategias para darle solucion a esta problematica son: disminuir del area de lucernarios, cambiar las luminarias existentes, aumentar la ventilacion, implementar canceleria, etc. Con los resultados obtenidos nace la esperanza de que se utilicen estrategias de diseno bioclimatico para ahorrar energia en otros edificios, ya que muchas veces las edificaciones poseen un diseno que unicamente provoca el uso imprudente de la energia.

  19. Edificio de la O.M.S., en Ginebra (Suiza

    Directory of Open Access Journals (Sweden)

    Tschumi, J.

    1968-07-01

    Full Text Available This project consists mainly of an administrative block, of 8 storeys, and two basements, which houses the general services, and the administrative and social offices of the World Health Organisation, The social services occupy the top part of the building, so that the marvellous panorama of the Lake Leman, the Jura Mountains and Alps can be admired from its windows. There is also a building containing a lecture hall with a capacity for 400 people, fitted with simultaneous translation services, and which can be occasionally transformed into a cinema.Consta en esencia: 1 De un bloque administrativo, con ocho plantas de altura y dos niveles inferiores, que alojan los servicios: generales; administrativos, y sociales de la Organización Mundial de la Salud (O. M, S.; estos últimos organizados en la parte más alta, con el fin de permitir la observación del maravilloso panorama que se divisa sobre el lago Leman, el Jura y los Alpes. 2 De un edificio, destinado a sala de conferencias, con capacidad para unas 400 personas, dotado de equipos para traducción simultánea, y que en determinadas ocasiones puede transformarse en cine.

  20. Sin, Punishment And Forgiveness In Ancient Greek Religion: A ...

    African Journals Online (AJOL)

    This paper looks in particular at the special sin of hubris in ancient Greek religious thought. It examines what constitutes hubris and some cases in which hubris has been committed and punished. It demonstrates with examples that hubris is an unforgivable sin in ancient Greek religion and examines the reasons for this ...

  1. Resisting the therapeutic reduction: on the significance of sin.

    Science.gov (United States)

    Delkeskamp-Hayes, Corinna

    2007-01-01

    Sin-talk, though politically incorrect, is indispensable. Placing human life under the "hermeneutic of sin" means acknowledging that one ought to aim flawlessly at God, and that one can fail in this endeavor. None of this can be appreciated within the contemporary post-Christian, mindset, which has attempted to reduce religion to morality and culture. In such a secular context, the guilt-feelings connected with the recognition of sin are considered to be harmful; the eternal benefit of a repentance is disregarded. Nevertheless, spirituality appears to have therapeutic benefits. Therefore attempts are made to re-locate within healthcare a religion shorn of its transcendent claims, so as then to harvest the benefits of a spirituality "saved from sin". This reduction of religiosity to its therapeutic function is nourished by a post-modern constructivist construal of religion. This article critically examines the dis-ingenuity marring such recasting, as well as the incoherence of related attempts to reduce transcendence to solidarity, and to re-shape the significance of religious rituals.

  2. The human dark side: evolutionary psychology and original sin.

    Science.gov (United States)

    Lee, Joseph; Theol, M

    2014-04-01

    Human nature has a dark side, something important to religions. Evolutionary psychology has been used to illuminate the human shadow side, although as a discipline it has attracted criticism. This article seeks to examine the evolutionary psychology's understanding of human nature and to propose an unexpected dialog with an enduring account of human evil known as original sin. Two cases are briefly considered: murder and rape. To further the exchange, numerous theoretical and methodological criticisms and replies of evolutionary psychology are explored jointly with original sin. Evolutionary psychology can partner with original sin since they share some theoretical likenesses and together they offer insights into the nature of what it means to be human.

  3. SIN3A mutations are rare in men with azoospermia.

    Science.gov (United States)

    Miyamoto, T; Koh, E; Tsujimura, A; Miyagawa, Y; Minase, G; Ueda, Y; Namiki, M; Sengoku, K

    2015-11-01

    A loss of function of the murine Sin3A gene resulted in male infertility with Sertoli cell-only syndrome (SCOS) phenotype in mice. Here, we investigated the relevance of this gene to human male infertility with azoospermia caused by SCOS. Mutation analysis of SIN3A in the coding region was performed on 80 Japanese patients. However, no variants could be detected. This study suggests a lack of association of SIN3A gene sequence variants with azoospermia caused by SCOS in humans. © 2014 Blackwell Verlag GmbH.

  4. Metodología para el diagnóstico y mejoramiento de los edificios del sector salud a partir del concepto de sustentabilidad

    OpenAIRE

    Martini, Irene

    2005-01-01

    Se plantea desarrollar una metodología para el diagnóstico, diseño, construcción y reciclado de los edificios del sector salud a partir del concepto de sustentabilidad ambiental y producir pautas de mejoramiento a partir de las variables críticas identificadas. (Párrafo extraído del texto a modo de resumen)

  5. Análisis de la transmitancia térmica y resistencia al impacto de los muros de quincha

    Directory of Open Access Journals (Sweden)

    Cuitiño, G.

    2015-03-01

    Full Text Available Wattle construction is a mixed technique used on walls and that belong to the frameworks family. It is constructed with a structural frame (wood or bamboo filled in with a mixture of clay mud in a plastic state and vegetable fiber. In this paper thermal transmittance and soft shock resistance had been studied, thermal transmittance had been measured with wattle samples of 0.10 m thickness, and result in 2.64 W/m2K and with the addition of expanded polystyrene sheet of 5 mm thicknees inside the panel, the transmittance was 2.02 W/m2K. These values are batter than a brick wall of 0.20 m thick with a finish plaster on both sides of the wall, whose value is 4.13 W/m2K. For impact resistance, panels were constructed and tested to soft shock, on 1:1 scale. The permanent deformation in all cases was less than 3.6 mm required by the current standard. This implies that there was no appreciable deformations suffered enclosures providing security to a home. It’s concludes that has a good thermal and structural behavior, plus the characteristics of being economical and appropriate for selfconstruction, make feasible to implement as a massive scale.La quincha es una técnica mixta de muros perteneciente a la familia de los entramados. Compuesta de una armazón estructural (madera o bambú rellena con barro en estado plástico con añadido de fibras vegetales. Se determinó que la transmitancia térmica de un panel de quincha de 0,10 m de espesor, dando como resultado 2,64 W/m2K y con el agregado de una placa de poliestireno expandido de 5 mm de espesor en el interior el panel, la transmitancia es 2,02 W/m2K. Estos valores son comparables al de un muro de ladrillo de 0,20 m de espesor y revocado en ambas caras, cuyo valor es 4,13 W/ m2K. Para la resistencia al impacto, se construyeron paneles en escala 1:1 y se ensayaron al choque blando. Las deformaciones permanentes fue en todos los casos menor de 3,6 mm requerido por la Norma vigente. Esto implica que no

  6. The original risk: overtheologizing ethics and undertheologizing sin.

    Science.gov (United States)

    Müller, Denis

    2007-01-01

    The project of articulating a theological ethics on the basis of liturgical anthropology is bound to fail if the necessary consequence is that one has to quit the forum of critical modern rationality. The risk of Engelhardt's approach is to limit rationality to a narrow vision of reason. Sin is not to be understood as the negation of human holiness, but as the negation of divine holiness. The only way to renew theological ethics is to understand sin as the anthropological and ethical expression of the biblical message of the justification by faith only. Sin is therefore a secondary category, which can only by interpreted in light of the positive manifestation of liberation, justification, and grace. The central issue of Christian ethics is not ritual purity or morality, but experience, confession and recognition of our own injustice in our dealing with God and men.

  7. “estudio y simulación energético del edificio de la fiec con energyplus”

    OpenAIRE

    Briceño Maldonado, Richard Manuel; Peña Toro, Ph.D. Paulo

    2013-01-01

    En este documento se presenta el estudio energético y análisis de cargas térmicas del edificio de la Facultad de Ingeniería Eléctrica y Computación. El objetivo principal es realizar recomendaciones para disminuir la demanda de energía eléctrica debido a la excesiva carga térmica generada por los lucernarios de policarbonato alveolar. Se analizaron varias herramientas informáticas, y mediante matriz de decisión, se escogió a la denomina EnergyPlus. Se realizaron seis comparaciones a través de...

  8. Dos edificios administrativos, en San Francisco

    Directory of Open Access Journals (Sweden)

    Skidmore, Owings & Merrill, Arquitectos

    1964-07-01

    soportes perimetrales, separados a 1,626 m entre ejes, y cerramiento de muros-cortina construidos a base de cristal y aluminio anodizado.

  9. Edificio singular para la administración de una empresa en Venta de Baños, Palencia

    OpenAIRE

    Reyero Baños, Elena

    2014-01-01

    Proyecto de un edificio singular de oficinas para el control de una industrial. Constará de una parte administrativa y de atención al público, y otra más especifica en los distintos despachos. Se realizara la estructura metálica, distribución en tres plantas, incluye zona descanso y aseos para trabajadores, y todas las instalaciones necesarias Departamento de Ciencias de los Materiales e Ingeniería Metalúrgica, Expresión Gráfica en la Ingeniería, Ingeniería Cartográfica, Geodes...

  10. Construcción de un edificio bajo la figura del fideicomiso en Mar del Plata, en 2008

    OpenAIRE

    Fagioli, Francisco

    2008-01-01

    Se desarrolló el caso particular de la construcción de un edificio de departamentos en la ciudad de Mar del Plata proponiendo la implementación de la figura del Fideicomiso y se analizaron las ventajas que ello representa para los Fiduciantes. El proyecto incluyó un análisis del mercado y comercialización de los servicios, la viabilidad técnica y la de gestión, la enumeración de inversiones y los requisitos necesarios para cumplir con las legislaciones vigentes, el análisis ...

  11. Estabilización de taludes en el río Portoviejo, Ecuador

    Directory of Open Access Journals (Sweden)

    Roberto Watson-Quesada

    2008-03-01

    Full Text Available El río Portoviejo se encuentra en la ciudad homónima de la provincia Manabí, Ecuador. Los cambios ocurridos en el cauce del río y la construcción de obras de urbanización sobre una de sus márgenes han originado un talud inestable, proclive a la ocurrencia de deslizamientos y desprendimientos que ocasionan daños a las construcciones. Algunas técnicas de estabilización (muros de hormigón, muros de gaviones, entre otras han sido aplicadas sin éxito al ser finalmente destruidas por la propia acción del agua. Para resolver el problema se ensayó una variante del método de inyección, conjugada con el método de inca de pilotes, en la cual se diseñaron y construyeron a lo largo del talud, pantallas consistentes en perforaciones inyectadas con lechada de cemento y reforzadas con barras de acero. Esta solución de estabilización mejoró la cohesión de las rocas y el suelo del talud y por consiguiente la resistencia ante la erosión fluvial, sin alterar la geometría del cauce y preservando el entorno natural. La variante utilizada constituye una alternativa eficaz para la estabilización de taludes afectados por la erosión fluvial.

  12. Edificio administrativo y de viviendas - Hannover (Alemania Federal

    Directory of Open Access Journals (Sweden)

    Oesterlen, Dieter

    1972-03-01

    Full Text Available This project has a residential section, flats and apartments, and an extensive zone devoted to office space. There is also an underground parking facility with room for 60 cars. Special attention has been devoted to the overall harmony of the design, as well as to its functionality, rational distribution, good use of materials, colouring, and ease of maintenance. The building has every modern aid for comfortable occupancy, and the most recent technological innovations have been used. There are nine flats, each varying in size and distribution. In the office zone, there are lecture halls, council rooms, a canteen and terrace areas.Conjunto constituido por una parte residencial —viviendas y apartamentos—, gran zona de representación, oficinas, y sótano con aparcamiento para unos 60 vehículos. Se ha cuidado especialmente la armonía total, la funcionalidad de su distribución y el uso de materiales agradables, de suave contraste cromático y fácil entretenimiento. El complejo dispone de todas las comodidades y ha sido acondicionado con todos los adelantos de la técnica moderna. Las viviendas son nueve, con diferentes superficies y distribución. El edificio administrativo comprende las oficinas, salas de conferencias, salas de consejo y de juntas, cantina y terrazas.

  13. El movimiento moderno en Guadalajara: Cuarenta años de arquitectura (casi desconocida

    Directory of Open Access Journals (Sweden)

    Mónica del Arenal Pérez

    2013-12-01

    Full Text Available Guadalajara produjo, entre 1930 y principios de los años 70, notables ejemplos de una arquitectura austera y sin pretensiones estilísticas, con énfasis en el sentido espacial y funcional. Sin duda, el creciente uso del concreto armado como sistema constructivo sustituyó los sistemas tradicionales basados en el uso de la madera, el adobe y la piedra. El Movimiento Moderno en Guadalajara reúne las obras de tres generaciones de ingenieros y arquitectos que cambiaron la imagen urbana de la ciudad con las propuestas derivadas de las nuevas visiones de la arquitectura, acuñadas en Europa en el primer tercio del siglo XX. Estas influencias fueron el racionalismo de la escuela Bauhaus y la apropiación de algunos de los cinco puntos para una nueva arquitectura de Le Corbusier: la vivienda elevada sobre pilotes, las cubiertas habitables como terrazas-jardín, la planta libre, la ventana longitudinal y la fachada libre -tanto de ornamento como de función estructural. La selección de obras producidas en Guadalajara, México, se clasifica en los siguientes apartados: Los precursores / Los ingenieros / La Escuela de Arquitectura de la Universidad de Guadalajara / Edificios con celosías / Edificios con cubiertas de paraboloides hiperbólicos (Hypar / Edificios con integración plástica / Complejo Agua Azul

  14. Pp scattering at SIN

    International Nuclear Information System (INIS)

    Aprile-Giboni, E.; Cantale, G.; Hausammann, R.

    1983-01-01

    Using the PM1 polarized proton beam at SIN and a polarized target, the elastic pp scattering as well as the inelastic channel pp → π + d have been studied between 400 and 600 MeV. For the elastic reaction, a sufficient number of spin dependent parameters has been measured in order to do a direct reconstruction of the scattering matrix between 38 0 /sub cm/ and 90 0 /sub cm/. 10 references, 6 figures

  15. Edificio de Oficinas en Viena – Austria

    Directory of Open Access Journals (Sweden)

    Lippert, Georg

    1979-05-01

    Full Text Available The main offices of Austrian Airlines are located in the outskirts of Vienna. in a large lot, 32,700 m2 in area, of which 13,000 m2 are occupied by the building, while the remaining surface are yards and landscaping. The building consists of four stories above ground and an ample basement for car park and services. The aboveground floors are distributed into numerous offices and rooms, plus a restaurant and coffee shop for guests and mess all for 800 employees and a kitchen. Outstanding in the architectural design is a 32 m-high tower conceived as a distinct element, symbolizing and suggesting from faraway the nature of the company's activities.

    Las oficinas centrales de la Austrian Airlines están emplazadas en las proximidades de Viena, en una amplia parcela de 32.700 m2, de los que la construcción ocupa 13.000, destinados los restantes a Jardines y explanadas. El edificio consta de cuatro plantas de altura máxima y un amplio sótano destinado a servicios y aparcamientos. En las plantas superiores se distribuyen numerosos despachos y oficinas, restaurante y cafetería para clientes, y comedor, con cocina, para una plantilla de 800 empleados. En el planteamiento arquitectónico destaca una torre de 32 m de altura, concebida como elemento distintivo capaz de sugerir, a distancia, la naturaleza de la actividad de la compañía.

  16. Ventanas penquistas

    Directory of Open Access Journals (Sweden)

    CEDAC (Centro de Diseño, Arquitectura y Construcción

    1983-12-01

    Full Text Available Las ventanas en la ciudad, por cierto, reflejan nuestra cultura e historia. Vemos en ellas los gustos y las riquezas de otras épocas. Por su intermedio se otorga significado a las fachadas y así a las edificaciones. Una ventana puede ser un simple vano en el muro sin adorno ni canto esculpido. Pero también ricamente adornada y significaciones desde los jambajes neoclásicos en madera hasta columnas neoclásicas en relieve.

  17. Construcción de edificios con elementos-cajones, de hormigón ligero, unidos por pretensado – Rumanía

    Directory of Open Access Journals (Sweden)

    Halmagiu, Mircea

    1974-06-01

    Full Text Available This article presents a Rumanian construction system to build multistoried buildings by using «boxes» of lightweight concrete, that are finally joined by prestressed concrete. The article describes the project and the execution of the mentioned boxes, their structure and their original installations. The box-cell type is 3.60 x 5.60 x 2.75 m and weighs 15.2 t. It was delivered completely finished and equipped. The research done on this technology is described as well as the project of an experimental building that is being constructed at present.En este artículo se presenta un sistema de construcción rumano, para realizar edificios de varias plantas, utilizando «cajones» de hormigón ligero con unión definitiva por pretensado. Se describe el proyecto y ejecución de los citados cajones, de su estructura y de sus originales instalaciones. La caja-célula tipo tiene 3,60 x 5,60 x 2,75 m y pesa 15,5 t. Se entregó completamente terminada y equipada. Se habla de las investigaciones emprendidas, así como del proyecto de un edificio experimental que se está construyendo actualmente.

  18. Operability of glioblastomas: "sins of action" versus "sins of non-action".

    Science.gov (United States)

    Ferroli, Paolo; Schiariti, Marco; Finocchiaro, Gaetano; Salmaggi, Andrea; Castiglione, Melina; Acerbi, Francesco; Tringali, Giovanni; Farinotti, Mariangela; Broggi, Morgan; Roberto, Cordella; Maccagnano, Elio; Broggi, Giovanni

    2013-12-01

    Despite prognosis of glioblastomas is still poor, mounting evidence suggests that more extensive surgical resections are associated with longer life expectancy. However, the surgical indications, at present, are far from uniform and the concept of operability is extremely surgeon-dependant. The results of glioblastoma resection in 104 patients operated on between March 2005 and April 2011 were reviewed with the aim to shed some light on the limits between 'sins of action' (operating upon complex tumors causing a permanent severe deficit) and 'sins of non-action' (considering inoperable tumors that can be resected with good results). Fifty-five patients (54.4 %) (Group 1) presented with a 'disputable' surgical indication because of one or more of the following clinico-radiological aspects: involvement of motor and language areas (39.4 %), deep location (7.7 %), corpus callosum infiltration (13.4 %), or major vessels encasement (8.6 %). Forty-six (42.5 %) patients (Group 2) presented with an 'indisputable' surgical indication (readily accessible tumors in non-eloquent areas). Overall mortality was 2.9 %. The mean overall survival was 19.8 months and not significantly different in the two Groups (20.4 Group 2 and 19.5 months for Group 1; p = 0.7). Patients with GTR and <72 years had a longer survival (p = 0.004 and 0.03, respectively). Seventy patients (69.3 %) showed an uneventful post-operative course, without statistical significance difference between Group 1 and 2. The gross total removal of glioblastoma with many complexities (Group 1) was found to be feasible with acceptable mortality, morbidity and long-term survival rates.

  19. Evaluation of environmental sustainability in the construction and management of buildings in Mexico; Evaluacion de la sustentabilidad ambiental en la construccion y administracion de edificios en Mexico

    Energy Technology Data Exchange (ETDEWEB)

    De Buen Rodriguez, Odon [Energia, Tecnologia y Educacion, S.C., ENTE, S.C. (Mexico)

    2010-12-15

    international system of certification of environmental sustainability. In particular, it is recommended: 1) To suggest to CONUEE the integration of additional variables to its database, 2) To conduct a national survey of commercial buildings, 3) To review information on commercial buildings located in Mexico by international organizations. Likewise, besides the support of the CONUEE, it would be useful to carry out an study jointly with the Comision Federal de Electricidad (CFE), the Secretaria de Energia (SENER) and the Fideicomiso para el Ahorro de Energia Electrica (FIDE), in order to share and generate information for common analytical needs. Also, it is suggested to establish contact with chambers, associations and companies operating primarily in buildings such as schools, hospitals, hotels, department stores, supermarkets and restaurants. [Spanish] Esta investigacion tuvo como objetivo desarrollar una metodologia para la evaluacion de la sustentabilidad de los edificios en Mexico que pueda ser estandarizada y equiparable con el resto de Norteamerica. Con este proposito se revisaron y analizaron tres sistemas de evaluacion de edificaciones sustentables en Norteamerica: Leadership in Energy and Environmental Design (LEED), Living Building Challenge (LBC) y Energy Star for Buildings. Ademas, se incluyo en el analisis el sistema espanol Green Building Council Espana (GBCe) con el fin de tener un punto referencia distinto al norteamericano. Como resultado del analisis de los sistemas de evaluacion consultados se decidio utilizar Energy Star como sistema de referencia para el desarrollo de una metodologia propia por las siguientes razones: a) La metodologia de Energy Star permite la comparacion de consumos de energia, lo cual permitiria estimar emisiones de gas de efecto invernadero, b) Es el sistema que requiere de la descripcion mas sencilla del edificio (datos de area, de ocupacion y de demanda y consumo energeticos) y no requiere - a diferencia de los otros sistemas

  20. Evaluation of environmental sustainability in the construction and management of buildings in Mexico; Evaluacion de la sustentabilidad ambiental en la construccion y administracion de edificios en Mexico

    Energy Technology Data Exchange (ETDEWEB)

    De Buen Rodriguez, Odon [Energia, Tecnologia y Educacion, S.C., ENTE, S.C. (Mexico)

    2010-12-15

    fully international system of certification of environmental sustainability. In particular, it is recommended: 1) To suggest to CONUEE the integration of additional variables to its database, 2) To conduct a national survey of commercial buildings, 3) To review information on commercial buildings located in Mexico by international organizations. Likewise, besides the support of the CONUEE, it would be useful to carry out an study jointly with the Comision Federal de Electricidad (CFE), the Secretaria de Energia (SENER) and the Fideicomiso para el Ahorro de Energia Electrica (FIDE), in order to share and generate information for common analytical needs. Also, it is suggested to establish contact with chambers, associations and companies operating primarily in buildings such as schools, hospitals, hotels, department stores, supermarkets and restaurants. [Spanish] Esta investigacion tuvo como objetivo desarrollar una metodologia para la evaluacion de la sustentabilidad de los edificios en Mexico que pueda ser estandarizada y equiparable con el resto de Norteamerica. Con este proposito se revisaron y analizaron tres sistemas de evaluacion de edificaciones sustentables en Norteamerica: Leadership in Energy and Environmental Design (LEED), Living Building Challenge (LBC) y Energy Star for Buildings. Ademas, se incluyo en el analisis el sistema espanol Green Building Council Espana (GBCe) con el fin de tener un punto referencia distinto al norteamericano. Como resultado del analisis de los sistemas de evaluacion consultados se decidio utilizar Energy Star como sistema de referencia para el desarrollo de una metodologia propia por las siguientes razones: a) La metodologia de Energy Star permite la comparacion de consumos de energia, lo cual permitiria estimar emisiones de gas de efecto invernadero, b) Es el sistema que requiere de la descripcion mas sencilla del edificio (datos de area, de ocupacion y de demanda y consumo energeticos) y no requiere - a diferencia de los otros

  1. El Estudio Paramental en el Modelo de Información del Edificio Histórico o “Proyecto HBIM”

    Directory of Open Access Journals (Sweden)

    Juan Enrique Nieto Julián

    2014-10-01

    Full Text Available El Modelado de Información para la Construcción (BIM se ha convertido actualmente en un sistema colaborativo que beneficia enormemente a las industrias involucradas en el sector AEC. La esencia del BIM es ser un núcleo contenedor con información gráfica y alfanumérica, donde cada disciplina participativa vuelca sus conocimientos para adaptarse a las singularidades del edificio de forma coordinada con los demás agentes intervinientes. Si este mismo escenario lo trasladamos al Patrimonio, veremos que las necesidades serán las mismas; el arqueólogo, el arquitecto, el historiador, el ingeniero o el restaurador se encuentran en la misma encrucijada a la hora de trasmitir sus hipótesis y someterlas a debate antes de la aprobación. En el artículo se expondrá una metodología eficaz para implementar el estudio estratigráfico de paramentos. La intención es volcar la información recabada en la fase de auscultación en un único modelo gráfico, operativo desde las diferentes disciplinas y que permita interoperacionalizar datos evitando duplicaciones superfluas y contradictorias. Se constituirá un proyecto de intervención sustentado en un Modelo de Información Patrimonial o del Edificio Histórico, que podemos denominar Proyecto HBIM.

  2. Dma1-dependent degradation of SIN proteins during meiosis in Schizosaccharomyces pombe.

    Science.gov (United States)

    Krapp, Andrea; Simanis, Viesturs

    2014-07-15

    The Schizosaccharomyces pombe septation initiation network (SIN) is required for cytokinesis during vegetative growth and for spore formation during meiosis. Regulation of the SIN during mitosis has been studied extensively, but less is known about its meiotic regulation. Here, we show that several aspects of SIN regulation differ between mitosis and meiosis. First, the presence of GTP-bound Spg1p is not the main determinant of the timing of Cdc7p and Sid1p association with the spindle pole body (SPB) during meiosis. Second, the localisation dependencies of SIN proteins differ from those in mitotic cells, suggesting a modified functional organisation of the SIN during meiosis. Third, there is stage-specific degradation of SIN components in meiosis; Byr4p is degraded after meiosis I, whereas the degradation of Cdc7p, Cdc11p and Sid4p occurs after the second meiotic division and depends upon the ubiquitin ligase Dma1p. Finally, Dma1p-dependent degradation is not restricted to the SIN, as we show that Dma1p is needed for the degradation of Mcp6p (also known as Hrs1p) during meiosis I. Taken together, these data suggest that stage-specific targeted proteolysis plays an important role in regulating meiotic progression. © 2014. Published by The Company of Biologists Ltd.

  3. Prediction of the electron redundant SinNn fullerenes

    Science.gov (United States)

    Yang, Huihui; Song, Yan; Zhang, Yan; Chen, Hongshan

    2018-05-01

    The stabilities and electronic structures of SimAln-mNn and SinNn (n = 16, 20, m = 12 and n = 24, m = 16) fullerene-like cages have been investigated using density functional method B3LYP and the second-order perturbation theory MP2. The results show that the SimAln-mNn and SinNn fullerenes are more stable than the AlN counterparts. Comparing with the corresponding AlnNn cages, one silicon atom in each Si2N2 square protrudes and the excess electrons reside as lone pair electrons at the outside of the protrudent Si atoms. Analyses on the electronic structures suggest that the Sisbnd N bonds are covalent bonding with strong polarity. The ELF (electron localization function) shows large electron pair probability between Si and N atoms. The orbital interactions between Si and N are stronger than that between Al and N atoms; the overlap integral is 0.40 per Sisbnd N bond in SinNn and 0.34 per Alsbnd N bond in AlnNn. The AIM (atoms in molecule) charges on the Al atoms in AlnNn and SimAln-mNn are 2.37 and 2.40. The charges on the in-plane and protrudent Si atoms are about 2.88 and 1.50 respectively. Considering the large local dipole moments around the protrudent Si atoms, the electrostatic interactions are also favorable to the SiN cages.

  4. Nueva sede del banco hipotecario de España. Madrid. España

    Directory of Open Access Journals (Sweden)

    González Pérez, José Ignacio

    1989-02-01

    Full Text Available The new office building of the Banco Hipotecario de España (Mortgage Bank of Spain located in downtown Madrid at 12 Paseo de Recoletos, is one of the most characteristic examples of a determinate construction procedure in this city. The original façades of the building were preserved and restored due to the necessity of taking into account the urban landscape. Stabilizing scaffolding and gunite in the interior of said façades were used in the restoration process. Because of the necessity of clearing and removing earth from the lot to construct three basements, as well as the presence of joint party walls, core walls and perimetre piles with antifuniculars for shoring up were also constructed. This new building meets all the needs of a modern bank, being equipped with an automated management and control system.

    El nuevo edificio de oficinas para el Banco Hipotecario de España, situado en el centro de Madrid en el paseo de Recoletos, n° 12, constituye un ejemplo característico en la ciudad de un determinado proceso constructivo. La obligada consideración del paisaje urbano ha tenido como consecuencia la conservación y restauración de las fachadas del edificio primitivo. En el proceso se han utilizado andamios estabilizadores y gunitado interior de dichas fachadas. La necesidad de vaciar el solar para construir tres sótanos, así como la presencia de las medianerías colindantes, han conllevado la construcción de muros pantallas y pilotes perimetrales con antifuniculares de arriostramiento. El nuevo edificio responde a las necesidades de un banco moderno, así pues va dotado de un sistema automatizado de gestión y control.

  5. 10 years of SIN

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    1984-11-15

    The Schweizerisches Institut fur Nuklearforschung (Swiss Institute for Nuclear Research, or SIN) proudly celebrated its 10th anniversary earlier this year. Welcoming the audience at a reception on 22 June, Swiss Federal Councillor Alphons Egli recalled that only about one human lifetime ago was it demonstrated that the atom, despite its name (from the Greek for indivisible), could in fact be split. Since then, questions arising from this discovery have continued to fascinate research workers all over the world.

  6. 10 years of SIN

    International Nuclear Information System (INIS)

    Anon.

    1984-01-01

    The Schweizerisches Institut fur Nuklearforschung (Swiss Institute for Nuclear Research, or SIN) proudly celebrated its 10th anniversary earlier this year. Welcoming the audience at a reception on 22 June, Swiss Federal Councillor Alphons Egli recalled that only about one human lifetime ago was it demonstrated that the atom, despite its name (from the Greek for indivisible), could in fact be split. Since then, questions arising from this discovery have continued to fascinate research workers all over the world

  7. Hospital de San José en Tacoma, Washington- (EE.UU.

    Directory of Open Access Journals (Sweden)

    Goldberg, Bertrand

    1977-02-01

    . Las dos plantas del núcleo central, en la base de la torre, albergan el conjunto de la maquinaria que sirve al edificio. Las nueve plantas de la torre se destinan: una a pediatría, otra a especialidades médicas, una tercera a ginecología y recuperación de partos, cuatro a pacientes médico-quirúrgicos y dos para futuras ampliaciones. La planta tipo de habitaciones consiste en cuatro cuadrantes simétricos, realizados con muros de cerramiento resistentes, en los que se alternan concavidades y convexidades en todo lo alto del edificio. Cada zona consta de ocho o nueve habitaciones, dispuestas en semicírculo en torno a un puesto de enfermeras, lo que permite una atención visual directa de los pacientes sin necesidad de desplazamientos por parte de aquéllas. A su vez el conjunto utiliza los servicios generales del núcleo central y las escaleras y ascensores que lo rodean. El tratamiento interior del edificio es sobrio y funcional, completándose con un numeroso conjunto de instalaciones que contribuyen a su confortabilidad y buen funcionamiento.

  8. Estimated potential of energy saving and reduction of the demand commercial buildings illumination; Potencial estimado de ahorro de energia y reduccion de la demanda en iluminacion de edificios comerciales

    Energy Technology Data Exchange (ETDEWEB)

    Hernandez Gomez, Victor Hugo; Morillon Galvez, David [Posgrado en Energetica de la DEPFI-UNAM, Mexico, D. F. (Mexico)

    1999-07-01

    In this paper the estimated energy saving potential in illumination, the energy end use and the technology used in commercial buildings of different use is analyzed. Estimation that departs from information of the Fideicomiso para el Ahorro de Energia (FIDE) demonstrative cases, presents the energy saving and the demand reduction in a sample of 29 buildings, among which are shopping malls, hospitals, schools, hotels, restaurants and public buildings in which energy saving programs have been carried out, with measures such as the cleaning of the luminaries and its replacement for more efficient ones. The average saving obtained is of 21.81%, in the following areas: illumination, air conditioning and others. In addition, in a sample of 4 buildings, it was observed that before applying the energy saving programs, two of them did not fulfill with the norm NOM-007-1995 (electric power density in interior lighting systems W/m{sup 2}) and later did fulfill the values and criteria of the norm. [Spanish] En el presente trabajo se analiza el potencial estimado de ahorro de energia en iluminacion, el uso final de la energia y la tecnologia empleada en edificios comerciales de uso distinto. Estimacion que parte de la informacion de los casos demostrativos del Fideicomiso para el Ahorro de Energia (FIDE), se presenta el ahorro y reduccion de la demanda en una muestra de 29 edificios, entre los que se tienen centros comerciales, hospitales, escuelas, hoteles, restaurantes y edificios publicos en los cuales se ha llevado a cabo programas de ahorro de energia, con medidas como la limpieza de las luminarias y su remplazo por otros mas eficientes. El ahorro promedio obtenido es de 21.81%, en las siguientes areas: iluminacion, aire acondicionado y otros. Ademas, en una muestra de 4 edificios, se observo que antes de aplicar los programas de ahorro de energia, dos no cumplian con la norma NOM-007-ENER-1995 (densidad de potencia electrica en alumbrado interior W/m{sup 2}) y

  9. Ahorros en los consumos para enfriamiento de espacios interiores mediante la evaluación de sistemas de protección solar en edificios residenciales en altura. El caso de la "ciudad-oasis" de Mendoza, Argentina

    Directory of Open Access Journals (Sweden)

    Julieta Balter

    2016-06-01

    Full Text Available El presente trabajo estudia el comportamiento térmico y energético de edificios residenciales en altura, en el contexto particular de una “ciudad-oasis”. Se plantea como objetivo la definición de sistemas de control solar adecuados en la envolvente para cada tipología material de edificio -másica y liviana- y para cada estrato en altura de las viviendas: debajo y sobre de la copa de los árboles. El monitoreo de viviendas en uso permite validar modelos geométricos (software Energy Plus y simular propuestas de aplicación de elementos de protección solar. Se analizan los ahorros en los consumos para enfriamiento en departamentos en niveles bajos, medios y altos. Los resultados muestran que en el edificio másico, en las viviendas ubicadas debajo de la copa de los árboles, es posible anular las cargas energéticas para enfriamiento mediante el uso de elementos exteriores de protección solar. Mientras que en las viviendas sobre la copa de los árboles, los ahorros energéticos se encuentran entre el 32% y 42%. En el edificio liviano, la aplicación de sistemas de control en departamentos bajo la copa de los árboles alcanza ahorros del orden del 53% y en las viviendas sobre la copa, las reducciones energéticas se encuentran entre el 46% y 54%. Las dimensiones adecuadas de tales elementos pueden generar propuestas posibles de ser transferidas a las normativas locales de edificación. 

  10. Understanding original antigenic sin in influenza with a dynamical system.

    Science.gov (United States)

    Pan, Keyao

    2011-01-01

    Original antigenic sin is the phenomenon in which prior exposure to an antigen leads to a subsequent suboptimal immune response to a related antigen. Immune memory normally allows for an improved and rapid response to antigens previously seen and is the mechanism by which vaccination works. I here develop a dynamical system model of the mechanism of original antigenic sin in influenza, clarifying and explaining the detailed spin-glass treatment of original antigenic sin. The dynamical system describes the viral load, the quantities of healthy and infected epithelial cells, the concentrations of naïve and memory antibodies, and the affinities of naïve and memory antibodies. I give explicit correspondences between the microscopic variables of the spin-glass model and those of the present dynamical system model. The dynamical system model reproduces the phenomenon of original antigenic sin and describes how a competition between different types of B cells compromises the overall effect of immune response. I illustrate the competition between the naïve and the memory antibodies as a function of the antigenic distance between the initial and subsequent antigens. The suboptimal immune response caused by original antigenic sin is observed when the host is exposed to an antigen which has intermediate antigenic distance to a second antigen previously recognized by the host's immune system.

  11. Análisis y mejoras en el sistema de climatización en edificio de oficinas en Alicante

    OpenAIRE

    VERA CARBONELL, JENARO

    2017-01-01

    El objetivo del proyecto es estudiar y proponer posibles mejoras para minorar el consumo eléctrico del sistema de acondicionamiento térmico que, actualmente, esta instalado en un edificio de oficinas del Instituto Nacional de la Seguridad Social en Alicante que más tarde describiremos y ubicaremos con más precisión. Para este análisis disponemos del proyecto de reforma de la instalación de climatización [20] que se redactó en el año 2013. Como objetivo secundario se anali...

  12. ARCHAEOMAGNETIC STUDY OF THE EDIFICIO DE LAS COLUMNAS COMPLEX, EL TAJIN, MESOAMERICA (Estudio arqueomagnético del complejo del Edificio de las Columnas, El Tajín, Mesoamérica

    Directory of Open Access Journals (Sweden)

    Jaime Urrutia-Fucugauchi

    2017-12-01

    Full Text Available We report the initial results of an archaeomagnetic study on ceramic samples from the Edificio de las Columnas architectonic complex, located in the northern sector of El Tajin, an archaeological site. Measurements of magnetic properties include low-field susceptibility, direction and intensity of natural remanent magnetization, magnetic hysteresis, temperature-dependent susceptibility, isothermal remanent magnetization (IRM acquisition curves and back-field demagnetization of saturation IRM. We studied the vectorial composition and stability of remanent magnetization using alternating field and thermal demagnetization. Magnetic carriers are fine-grained titanomagnetites and magnetite with pseudo-single domain states. Characteristic magnetizations are determined from the high-temperature unblocking spectra. Determinants of paleointensity, which meet quality criteria, have high and low values. Possible explanations include alterations during thermal treatments and secondary overprints. The influence of alterations and the multivectorial magnetizations of overlapping spectra require detailed analysis to estimate the paleointensities. ESPAÑOL: Reportamos resultados del estudio arqueomagnético en muestras de cerámicas en el complejo arquitectónico del Edificio de las Columnas, localizado en el sector norte de El Tajín. Las mediciones de propiedades magnéticas incluyen susceptibilidad magnética, dirección e intensidad de la magnetización remanente natural, histéresis, variación de la susceptibilidad con temperatura, curvas de adquisición de magnetización isotermal y desmagnetización por campos directos de la magnetización isotermal de saturación. La composición vectorial y estabilidad de la magnetización remanente se investigaron por desmagnetización por campos magnéticos alternos y por temperatura. Las magnetizaciones muestran dos componentes que residen en titanomagnetitas y magnetita, con traslape en los espectros de

  13. Fuzzy adaptive integration scheme for low-cost SINS/GPS navigation system

    Science.gov (United States)

    Nourmohammadi, Hossein; Keighobadi, Jafar

    2018-01-01

    Due to weak stand-alone accuracy as well as poor run-to-run stability of micro-electro mechanical system (MEMS)-based inertial sensors, special approaches are required to integrate low-cost strap-down inertial navigation system (SINS) with global positioning system (GPS), particularly in long-term applications. This paper aims to enhance long-term performance of conventional SINS/GPS navigation systems using a fuzzy adaptive integration scheme. The main concept behind the proposed adaptive integration is the good performance of attitude-heading reference system (AHRS) in low-accelerated motions and its degradation in maneuvered or accelerated motions. Depending on vehicle maneuvers, gravity-based attitude angles can be intelligently utilized to improve orientation estimation in the SINS. Knowledge-based fuzzy inference system is developed for decision-making between the AHRS and the SINS according to vehicle maneuvering conditions. Inertial measurements are the main input data of the fuzzy system to determine the maneuvering level during the vehicle motions. Accordingly, appropriate weighting coefficients are produced to combine the SINS/GPS and the AHRS, efficiently. The assessment of the proposed integrated navigation system is conducted via real data in airborne tests.

  14. Proyecto estructural de edificio industrial de 1500m2 destinado a uso logístico, situado en el poligono L'Espartal (Jijona)

    OpenAIRE

    ESTEVE GIL, ALFONSO

    2016-01-01

    [ES] En este trabajo, el alumno realizará el proyecto estructural de una nave industrial sencilla, con tipología estructural a dos aguas, situada en un polígono industrial. Esteve Gil, A. (2016). Proyecto estructural de edificio industrial de 1500m2 destinado a uso logístico, situado en el poligono L'Espartal (Jijona). http://hdl.handle.net/10251/69514. TFGM

  15. Edificio circular de oficinas Arcis-Sur-Aube – Francia

    Directory of Open Access Journals (Sweden)

    Bayonne, Philippe

    1972-10-01

    Full Text Available This building has a very particular shape, as a result of the following ideas, which conditioned the initial project: — It was sought to integrate the whole staff within a single zone to give them a closer mutual relationship. — Seek to avoid the classical design, of broken up spaces, with many internal partitions, corridors and doors. — The building to operate as a control tower over the general activity of the whole works. — On the ground level, to have an additional free space for the storage of beet, during the harvesting period. In general terms the building consists of a circular stem, of reinforced concrete, housing the lift and stairs. Around it the office flooring structure is cantilevered, from this single support. The building is completed with a truncated cone roof, which houses, on two floor levels, the records rooms. The most important problems were the construction of the flooring reinforcement work and the formwork for the external surfaces. The first difficulty was overcome by means of four double girders, placed orthogonally, in couples, supported on the stem periphery; whilst the second was solved by using plywood on transversal and radial framework.Se trata de una construcción de forma muy particular, como consecuencia de las siguientes ideas que sirvieron de base para el proyecto: tender hacia una solución colectiva que, reuniendo al personal técnico bajo un mismo polo, les confiriera una más estrecha relación; huir de la solución «clásica » de plantas quebradas, con profusión de divisiones interiores, pasillos y puertas; función de torre de control sobre la actividad general de la fábrica, y disponer, al nivel del terreno, de superficie libre adicional para el almacenaje de remolacha en las épocas de recogida. El edificio en líneas generales consta de un fuste circular, central, de hormigón armado, que aloja en su interior al ascensor y a la escalera. En su periferia se apoya el forjado de la planta

  16. Judeo - Igbo traditional religious conception of sin: socio – religious ...

    African Journals Online (AJOL)

    Theword sin ismore of a religious termthan ordinary. It is basically an action of defiance. That is, an action through which one deviates from the correct way or through which one misses the mark. This paper looked at how the Jews of theOld andNewTestament periods understood the concept of sin in their society.

  17. La integración de sistemas activos de producción energética en la envolvente del edificio : taxonomía constructiva

    OpenAIRE

    París Viviana, Oriol

    2013-01-01

    Analisis de una metodología de clasificación para la integración de los sistemas fotovoltaicos en la envolvente del edificio. Para clasificar los diversos sistemas existentes en el mercado actual se ha teniendo en cuenta tanto la posición relativa que estos ocupan en la envolvente como los sistemas de soporte necesarios para su montaje

  18. Construction of Δm2--sin2 2θ plots

    International Nuclear Information System (INIS)

    Snyder, R.

    1991-01-01

    In the two-flavor approximation, the probability for a neutrino to oscillate from one flavor to the other is given by Ρ νa → νb = sin 2 2θ sin 2 (1.27 Δm 2 L/E ν ) where θ is the mixing angle, Δm 2 = |m νa 2 - m νb 2 | is measured in (eV/c 2 ) 2 , L, the distance from the source, is measured in km, and E, the beam energy, is measured in GeV. If either Δm 2 or sin 2 2Θ is zero, there is no oscillation. They might also have small, non-zero values, causing the oscillations to be so small as to be unobservable in a particular experiment. They may also have values which allow us to determine the probability of oscillation, but so far no compelling evidence for oscillation exists. The universal method of portraying what region of parameter space is explored by a neutrino oscillation experiment is to mark off an area on a Δm 2 vs. sin 2 2θ plot. Typically, a line is graphed, with the claim that if the experiment finds not evidence of oscillation, one can, for example, be 90% certain that Δm 2 and sin 2 2θ lie within the region below and to the left of the line. Since these plots are so widely used, it is useful to understand the process by which they are created

  19. Sin, suffering, and the need for the theological virtues.

    Science.gov (United States)

    Jones, David Albert

    2006-08-01

    This article examines the account of the relationship between sin and suffering provided by J. L. A. Garcia in "Sin and Suffering in a Catholic Understanding of Medical Ethics," in this issue. Garcia draws on the (Roman) Catholic tradition and particularly on the thought of Thomas Aquinas, who remains an important resource for Catholic theology. Nevertheless, his interpretation of Thomas is open to criticism, both in terms of omissions and in terms of positive claims. Garcia includes those elements of Thomas that are purely philosophical, such as natural law and acquired virtue, but neglects the theological and infused virtues, the gifts and fruits of the Holy Spirit, and the beatitudes. These omissions distort his account of the Christian life so that he underplays both the radical problem posed by sin (and suffering), and the radical character of the ultimate solution: redemption in Christ through the grace of the Holy Spirit.

  20. Biblioteca Brynmor Jones en la Universidad de Hull - Gran Bretaña

    Directory of Open Access Journals (Sweden)

    Castle Park Dean Hook, Arquitectos

    1973-06-01

    Full Text Available Castle Park Dean Hook, architects Consulting engineers: Ove Arup and Partners The second stage of construction is described, consisting of a new ten-storey building and the four-storey extension of the old library, thus increasing the book capacity from 250,000 to 1,000,000, and the capacity of readers from 250 to 1,650, with provision for eventually reaching 6,000 as maximum capacity. The tall building was constructed with reinforced concrete structure and outside finish consisting of brown glazed tiles on the lower floors and stainless steel panels with grey vitreous enamel on the five upper storeys, the windows of which have double glass with frames arranged at a 60° angle. The four-storey extension was carried out with brick walls with reinforced concrete frame-work. The same type or brick as that used in the old library was employed in order to maintain aesthetic continuity. On the inside, nylon felt carpet was used for covering the floors. The supports and structural walls are plastered; wood-work and partitions are painted. The ten-storey building is completely airconditioned, while this system in the other building is located only in the book deposit and the reading room.Se describe la segunda etapa de construcción, que consiste en un edificio nuevo de diez plantas y en la ampliación de cuatro plantas de la antigua biblioteca, con lo cual la capacidad de libros aumentó de 250.000 a 1.000.000 y el número de plazas de lectores de 250 a 1.650, estando prevista para llegar hasta 6.000 como capacidad máxima. El edificio alto se realizó con estructura de hormigón armado, y acabado exterior a base de baldosas vidriadas de color marrón en las plantas bajas y de paneles de acero inoxidable con esmalte vitreo de color gris en las cinco superiores, cuyas ventanas son de cristal doble con cercos dispuestos en ángulo de 60°. La ampliación de cuatro plantas se hizo con muros de carga de ladrillo visto y forjados de hormigón armado. Se

  1. The seven sins in academic behavior in the natural sciences.

    Science.gov (United States)

    van Gunsteren, Wilfred F

    2013-01-02

    "Seven deadly sins" in modern academic research and publishing can be condensed into a list ranging from poorly described experimental or computational setups to falsification of data. This Essay describes these sins and their ramifications, and serves as a code of best practice for researchers in their quest for scientific truth. Copyright © 2013 WILEY-VCH Verlag GmbH & Co. KGaA, Weinheim.

  2. Evaluación de la demanda energética de edificios no residenciales en Escocia = Energy demand benchmarking of non-domestic buildings in Scotland

    Directory of Open Access Journals (Sweden)

    Julien Chetboula

    2015-12-01

    Los parámetros decisivos fueron la intensidad de uso de la energía (kWh/m2 y el uso y la edad de los edificios. Esto permitió la creación de seis tipos de edificios, aunque siguiendo patrones de ocupación se dividió en cuatro categorías desde el s. XVI hasta el s. XXI. Los principales resultados revelan el predominio de un clúster de edificios educativos en términos de superficie (72%, el número de edificios (70%, las emisiones de carbono (68% de los cerca de 42.000 toneladas de CO2 y el consumo de energía (61% de la 38,4 MWh de electricidad consumida, y el 73% del 117,4 MWh de gas natural que se consume. Entre estos niveles de consumo destacan el potencial de ahorro de energía para las escuelas: 186 kWh / m2 / año en promedio, en comparación con la media europea de 100 kWh / m2 / año de energía térmica de uso final. Abstract Over the years building energy performance has become a predominant concern for owners and real estate managers. The focus is usually on residential buildings but in the last twenty years an interest in non-domestic buildings has emerged in the UK. Benchmarks can generally be found at UK scale, although often restricted to England and Wales. This paper aims to provide benchmarks for the Scottish non-domestic building stock as part of the City of Edinburgh Council estate. In this research, the selected sample includes energy data and calculated carbon emissions of 199 buildings. The deciding parameters were the energy use intensity (kWh/m2 and the use and age of buildings. The last two allowed the creation of six clusters in which to group buildings of similar occupancy patterns in four age categories from the 16th to the 21st century. The main findings reveal the predominance of an educational buildings cluster in terms of floor area (72%, number of buildings (70%, carbon emissions (68% of about 42,000 tons of CO2, and energy consumption (61% of the 38.4 MWh of electricity consumed, and 73% of the 117.4 MWh of natural gas

  3. Edificio de apartamentos Jardín del Atlántico Gran Canaria – España

    Directory of Open Access Journals (Sweden)

    López Díaz, Luis

    1978-11-01

    Full Text Available This building is located in the Playa del Inglés, the central core of the Maspalomas tourist resort, and was built as an answer to the urgent need for accommodations imposed by the overwhelming tourist influx arriving in increasingly larger and numerous charter flights. The building (containing 334 units in its five stories, all of the same type and identically oriented is provided with all amenities and facilities normally found in the best of hotels, such as two bars, a restaurant, a shopping area with several stores, social rooms, dance hall, gymnasium, sauna bath, tennis courts, four large swimming pools, children's playground, beauty parlour and barber shop, large carpark, 15,000 m2 of landscaped area, etc., offering occupants a healthy, enjoyable and convenient environment.

    En la Playa del Inglés, núcleo central del complejo turístico de Maspalomas, se ha levantado este edificio de apartamentos como respuesta a la imperiosa necesidad hotelera, motivada por la masiva afluencia de turistas que se desplazan en los, cada vez más grandes y numerosos, vuelos charter. El edificio, que en sus cinco plantas de altura distribuye 334 apartamentos —todos ellos del mismo tipo y con idéntica orientación—, está dotado de todas las comodidades y atracciones que pudiera tener el más completo de los hoteles, tales como: dos bares, restaurante, zona comercial con diversas tiendas, salones sociales, sala de baile, gimnasio, sauna, cancha de tenis, cuatro grandes piscinas, parque infantil, peluquerías de señoras y caballeros, amplísimo aparcamiento para coches, 15.000 m2 de jardín, etc., que proporcionan a sus ocupantes una vida sana, amena y confortable.

  4. El edificio Botines de León. Cómo se hizo

    Directory of Open Access Journals (Sweden)

    González Moreno-Navarro, José Luis

    2002-12-01

    Full Text Available The authors provide historic data on the construction process of the Bolines Building and offer their interpretation of the reasons for the "style" Gaudí used for the facades and the volume of the whole. However; the main part is given over lo describing the structure of the building which they consider surprising. They explain the construction procedures -some of them remarkable-used by the architect in the foundations, structure and roof, including safety margins, according lo the geotechnical report drawn up in 1993, which substantiates the criticism by Gaudi's contemporaries regarding the foundations. It also shows that although the slender walls have stood up lo a hundred years of gravitational force. there is no safety margin. It aII explains that his original system for collecting and channeling rainwater on the roof -correct in it's structural design and construction- was not entirely advantageous for the occupants. The authors also draw attention to the way in which the restorers kept in mind the overall concept of the building and the care they look in its rehabilitation, although they had no alternative but lo correct "young " Gaudi and rectify all his constructional slips.Los autores del articulo aportan algunos datos históricos acerca del proceso de construcción del monumento, ofrecen su interpretación sobre las razones de cómo Gaudí compuso las fachadas y el volumen del conjunto y, principalmente, describen el edificio -al cual califican de sorprendente- desde el punto de vista estructural.Se explican los procedimientos constructivos -algunos bien singulares- utilizados por el arquitecto en cimientos, estructura y cubierta, reflejando el margen de seguridad que ofrecían según el informe geotécnico realizado en 1993. Éste ratifica, por ejemplo. que las criticas que recibieron en su día las cimentaciones eran justificados; demuestra, también, que a pesar de que el comportamiento durante los cien años que han durado las

  5. Un conocer sin cegamientos

    Directory of Open Access Journals (Sweden)

    Carolina Ferrante

    2015-08-01

    Full Text Available En el presente artículo se reseña el libro La construcción de marcas de reconocimiento en sociedades ocularcentristas: el caso de mujeres ciegas del Área Metropolitana de Monterrey de Brenda Araceli Bustos García. Se describe el problema de investigación en el cual se inserta la tesis que nutre el libro y se recorre la trama argumental. Finalmente, se realiza una valoración positiva del modo de construcción del objeto de estudio, el cual promueve un conocer sin cegamientos. 

  6. Edificio Goya - Almería – España

    Directory of Open Access Journals (Sweden)

    Vallejo Acevedo, A.

    1973-03-01

    Full Text Available The building stands In the main avenue in Almería and successfully solves the different problems which its location involves: treating the frontage with a blend of suitable texture and colour; very careful formal plastic and pondered height and offset. It is made up of: — a commercial ground floor, — first floor - offices, — eight identical floors, with one dwelling per floor, — attic, taken up by another slightly smaller dwelling, and — an upper attic which houses the caretaker's dwelling and miscellaneous installations. The strong vertical structure is made up of perimetre line components and a compact core of vertical circulations, in reinforced concrete.El edificio está situado en la avenida principal de Almería y resuelve acertadamente los diversos problemas que entraña su emplazamiento: tratamiento de fachada con un vitraico de textura y color adecuados; plástica formal muy cuidada, y altura y retranquees ponderados. Consta de: — una planta baja comercial; — primera de oficinas; — ocho plantas iguales, con una vivienda por planta; — ático ocupado por otra vivienda algo más reducida, y — sobreático que alberga la vivienda del portero e instalaciones varias. La estructura vertical resistente está formada por elementos lineales perimetrales y núcleo compacto de circulaciones verticales, de hormigón armado.

  7. Estudio sísmico de los edificios agregados de obra de fábrica utilizando el método del espectro de capacidad

    Directory of Open Access Journals (Sweden)

    Moreno-González, R.

    2014-03-01

    Full Text Available In this work a study about the seismic behaviour of a set of masonry aggregates buildings located in the city of Barcelona, Spain, is presented. Considering the age of these buildings (more than 70 years two mechanical properties for the masonry were defined. The seismic action considered is defined by elastic response spectrum defined by Eurocode 8 for the seismic acceleration of Barcelona. To analyze these buildings the capacity spectrum method was used, from which the capacity curve and the fragility curves are obtained for evaluating the seismic expected damage. Damage probability matrices quantified the seismic damage and they are obtained from the fragility curves and the performance point. Considering that the city of Barcelona is located in an area of low seismicity, the results show an important seismic damage.Se presenta un estudio sobre el comportamiento sísmico de un conjunto de edificios agregados de obra de fábrica situados en la ciudad de Barcelona, España. Considerando la edad que tienen estos edificios (más de 70 años se definen dos propiedades mecánicas para la mampostería. La acción sísmica considerada se define a partir del espectro elástico de respuesta definido en el Eurocódigo 8 para la aceleración sísmica de Barcelona. Para analizar los edificios se utiliza el método del espectro de capacidad, a partir del cual se obtienen la curva de capacidad y las curvas de fragilidad para evaluar el daño sísmico esperado. Las matrices de probabilidad de daño cuantifican el daño sísmico y se obtienen a partir de las curvas de fragilidad y el punto de capacidad por demanda. Teniendo en cuenta que Barcelona se encuentra en una zona de baja sismicidad, los resultados obtenidos muestran un daño sísmico importante.

  8. A Precision Measurement of sin$^{2}\\theta$$_{w}$ from Semileptonic Neutrino Scattering

    CERN Document Server

    Wotschack, Jorg

    1987-01-01

    There is considerable interest in measuring the electroweak mixing parameter sin$^{2}\\Theta$$_{w}$, of the Glashow-Salam-Weinberg theory $^{1}$ as precisely as possible: first, its value may be predicted by models of Grand Unification;$^{2}$ second, precise measurements of sin$^{2}\\Theta$$_{w}$ from different processes would test the validity of electroweak radiative corrections. $^{3,$}$. Different methods have been used to determine sin$^{2}\\Theta$$_{w}$, over a large range of $Q^{2}$ values. FIGURE 1 gives a compilation of sin$^{2}\\Theta$$_{w}$ with remarkable agreement between the results. At present, it is most precisely determined in semileptonic neutrino-nucleon scattering from the ratio of neutral current (NC) to charged current (CC) cross and in proton-antiproton collisions from the W boson mass. $^{10,11}$.

  9. Procter & gamble, Edificio Administrativo - Schwalbach. Alemania Federal

    Directory of Open Access Journals (Sweden)

    Hentrich-Petschnigg & Partner, Arquitectos

    1974-03-01

    Full Text Available This elegant building was constructed on a large lot with a beautiful panoramic view near the city of Frankfurt. In consists of a basement, a large ground floor with reception and social facilities such as lounges, lobbies, coffee shops, etc.; seven-story star-block with vertical circulations and the laboratories are in the center. The building is basically used for offices. In a separate rectangular body, the service and boiler facilities are located. A spacious garden and parking area fill out the rest of the grounds. The possibility of quadrupling the current built volume is anticipated. The stories have been distributed with a basic 1.50 x 1.50 m module. Construction based on: metallic structure, concrete casting on metallic frames, red granite-covered concrete enclosures, double glazed glass, indoor vertical sunshades, carpeted floors and air conditioning.Próximo a Frankfort, sobre un gran solar de bellas panorámicas, se ha levantado este elegante edificio, que consta de: sótano, una extensa planta baja de carácter representativo y social (salones, vestíbulo, cafetería, etc.; bloque en estrella, de seis plantas, con las circulaciones verticales y los aseos en el centro, destinado, fundamentalmente, a oficinas. En un cuerpo rectangular separado se disponen las instalaciones y calderas. Un espacioso jardín y la zona de aparcamientos completan la ocupación del terreno, en el cual está prevista la posibilidad de cuadruplicar el volumen actualmente edificado. Las plantas se han distribuido con un módulo básico de 1,50 x X 1,50 m. Construcción fundamental, a base de: estructura metálica, forjados de hormigón sobre encofrados metálicos, cerramientos de hormigón revestido de granito rojo, cristales dobles, parasoles interiores verticales, suelos enmoquetados y aire acondicionado.

  10. Parroquia católica en Oxford, Gran Bretaña

    Directory of Open Access Journals (Sweden)

    Ahrends, Peter

    1974-03-01

    Full Text Available This strange new building was commissioned Í0 accommodate the expanding activities of the Newman Community which acts as a religious and social center for the Catholics of the University of Oxford. The following have been constructed: a chapel, a multiple-use room, entrance hall, bar, library, meeting room, eight bedrooms, small lounges and kitchen, etc. Part of the already existing building was used for the installation of another kitchen and several bathrooms. The best possible advantage has been taken of the lot which is narrow and irregularly shaped. Construction consists basically of brick walls, with columns, reinforced concrete stairs and castings.Este curioso y nuevo edificio se ha edificado para subsanar la creciente expansión de actividades de la Comunidad Newman, que actúa como centro religioso y social para los católicos de la Universidad de Oxford. Han sido construidos: una capilla, una sala de usos múltiples, entrada, bar, biblioteca, sala de reuniones, ocho dormitorios, pequeñas salitas y cocina, etc., aprovechando parte del edificio existente para ubicar otra cocina y varios cuartos de baño. El solar, que era estrecho y de forma irregular, se ha aprovechado al máximo. La construcción se ha llevado a cabo, fundamentalmente, a base de muros de fábrica de ladrillo, con pilares, forjados y escaleras de hormigón armado.

  11. Proyecto de restauración de la riera de Sant Genís de Palafolls en el T.M. de Malgrat de Mar

    OpenAIRE

    Miralpeix García, Marta

    2010-01-01

    El proceso de urbanización de la zona este de Malgrat de Mar colindante a la riera de Sant Genis de Palafolls se realizó sin tener en cuenta la existencia de la riera y su peligrosidad en episodios de lluvia torrencial. La falta de restricciones sobre el espacio a ocupar por las viviendas dio lugar al encajonamiento de la riera entre muros interiores de casas, realizados por cada unos de los propietarios de las casas colindantes. De ahí que los episodios de inundación se repita...

  12. An integrated program of geophysical survey, coring, and test excavations to study a 4th millennium bc-cal ditch at Alt del Punxó (Muro de L’alcoi, Alacant

    Directory of Open Access Journals (Sweden)

    García Puchol, Otero

    2008-06-01

    Full Text Available The potentially long and interesting archaeological sequence revealed by systematic survey at the site of Alt Del Punxó (Muro de l’Alcoi, Alacant was the basis for initiating a study of the locality’s subsurface structures using new methods of remote sensing. Geophysical survey (magnetometry and tomography and systematic augering revealed buried structures, including monumental earthworks, and guided subsequent excavations to collect more detailed data about the nature and age of these prehistoric features. The information recovered, including new radiocarbon dates, offers a new perspective on the organization of prehistoric populations in this region of south-central Valencia since the beginning of the Holocene and is especially important for understanding the Neolithic IIB from the 4th through the early 3rd Millennium BC.

    La amplia e interesante secuencia arqueológica sugerida por los materiales de superficie del yacimiento de Alt del Punxó (Muro de l’Alcoi, Alacant ha supuesto el punto de partida para la práctica de una serie de métodos de detección de las estructuras conservadas en el lugar. La prospección geofísica (magnetometría y tomografía, y los microsondeos (augers han dirigido la planificación de la excavación con el fin de obtener nuevos datos a propósito de la naturaleza y cronología del gran foso prehistórico, así como de las diversas estructuras localizadas. La información obtenida, junto a la serie radiocarbónica disponible, abre nuevas perspectivas para el estudio del poblamiento prehistórico al aire libre en las comarcas centro-meridionales valencianas desde los inicios del Holoceno, y de un modo particular en el IV e inicios del III milenio cal AC –Neolítico IIB.

  13. El caso de los tiradores del Muro de Berlín. A vueltas con algunos debates clásicos de la Filosofía del Derecho del siglo XX

    Directory of Open Access Journals (Sweden)

    Oscar Pérez de la Fuente

    2011-06-01

    Full Text Available RESUMEN Es artículo analiza el caso de los centinelas del muro de Berlín que disparaban y mataron a algunas personas –que querían pasar la frontera-, amparados por una interpretación del Derecho de la RDA. Algunos años después de la unificación alemana, el Tribunal Constitucional condenó  aquellos soldados por asesinato con el argumento que se trataba de Derecho “extremadamente injusto”. Esta es una forma particular  de aplicación de la fórmula de Radburch. El objetivo de este artículo es estudiar el caso de los centinelas del Muro de Berlín bajo la perspectiva del la Filosofía del Derecho, particularmente en la controversia entre positivismo y iusnaturalismo. En este sentido, se comparan los enfoques de Kelsen y Radburch sobre el Derecho nazi. Y también se estudia la polémica Hart Fuller sobre el caso de “delator rencoroso”.   ABSTRACT This article analyzes the case of the border guards of the Berlin Wall that have shot and killed some people -who wanted pass the frontier- and those soldiers were protected by some legal interpretation under the German Democratic Republic Law. Some years after the German unification, the Constitutional Court condemned those soldiers for murder with the argument that that was an “extremely unjust” Law. This was a particular form of application of the Radburch’s formula. The objective of this article is studying the case of the Berlin Wall border guards under the perspective of the Philosophy of Law, particularly the controversy between positivism and iusnaturalism. In this sense, they are compared Kelsen and Radbruch approaches on Nazi law. And also it’s studied the Hart-Fuller polemics on the ‘grudge infomer’ case.

  14. Estudio y diseño de un sistema inmótico para seguridad, comunicación y confort, utilizando el protocolo KNX para el edificio Torre Piamonte ubicado en el sector de Totoracocha de la ciudad de Cuenca

    OpenAIRE

    Jara Maldonado, Pedro Alcibiades

    2015-01-01

    El presente proyecto tiene como objetivo el estudio y diseño de un sistema inmótico para el edificio "Torre Piamonte" de la Ciudad de Cuenca. El estándar propuesto es el KNX. Se tiene los planos arquitectónicos y el diseño de planos inmóticos del edificio. Al final se obtiene el TIR y VAN para verificar la factibilidad del proyecto. This project aims to study and design of a building automation system for the "Torre Piedmont" building in the City of Cuenca. The proposed standard is the KNX...

  15. Utilización de ladrillos de adobe estabilizados con cemento portland al 6% y reforzados con fibra de coco, para muros de carga en Tampico

    Directory of Open Access Journals (Sweden)

    Olivares Santiago, Manuel

    2002-04-01

    Full Text Available In this article conclusions are presented about adobe bricks stabilized with 6% portland cement and reinforced with different percentages of coconut fibers. The author, has developed an experimental plan in laboratory and has built in situ several walls with different bricks, different joints and different orientations, to analyze the behaviour ofthe brick prototypes for the weather conditions in Tampico.En este artículo se presentan las conclusiones acerca del refuerzo Ide ladrillos de adobe, estabilizados con cemento portland al 6% con diferentes porcentajes de fibra de coco. El autol; para llegar a estas conclusiones, desarrolla un plan experimental en laboratorio asi como construye in situ muestras de muros con diferentes clases de ladrillos, diferentes uniones entre ellos y distintas orientaciones, para analizar el comportamiento de prototipos ante las condiciones climáticas de la zona de Tampico.

  16. Misattribution, false recognition and the sins of memory.

    Science.gov (United States)

    Schacter, D L; Dodson, C S

    2001-09-29

    Memory is sometimes a troublemaker. Schacter has classified memory's transgressions into seven fundamental 'sins': transience, absent-mindedness, blocking, misattribution, suggestibility, bias and persistence. This paper focuses on one memory sin, misattribution, that is implicated in false or illusory recognition of episodes that never occurred. We present data from cognitive, neuropsychological and neuroimaging studies that illuminate aspects of misattribution and false recognition. We first discuss cognitive research examining possible mechanisms of misattribution associated with false recognition. We also consider ways in which false recognition can be reduced or avoided, focusing in particular on the role of distinctive information. We next turn to neuropsychological research concerning patients with amnesia and Alzheimer's disease that reveals conditions under which such patients are less susceptible to false recognition than are healthy controls, thus providing clues about the brain mechanisms that drive false recognition. We then consider neuroimaging studies concerned with the neural correlates of true and false recognition, examining when the two forms of recognition can and cannot be distinguished on the basis of brain activity. Finally, we argue that even though misattribution and other memory sins are annoying and even dangerous, they can also be viewed as by-products of adaptive features of memory.

  17. Epigenetic activation of SIN1 promotes NSCLC cell proliferation and metastasis by affecting the epithelial–mesenchymal transition

    International Nuclear Information System (INIS)

    Hu, Zhongwu; Wang, Yaqin; Wang, Yuemei; Zang, Bao; Hui, Hongxia; You, Zhenbing; Wang, Xiaowei

    2017-01-01

    Stress-activated protein kinase (SAPK) interacting protein 1 (SIN1) is an essential component of mTORC2. Previous studies have shown that SIN1 is a key regulator of Akt pathway which plays an important role in various pathological conditions including cancer. While its effects and mechanisms on the progression of NSCLC remain unknown. In this study, we report that SIN1 is able to promote the growth and migration of NSCLC cells both in vitro and in vivo. Overexpression of SIN1 promoted A549 and H1299 cells proliferation by both MTT and colony formation assays. Consistently, knockdown of SIN1 inhibited the proliferation of these cells. In transwell assay, overexpression of SIN1 increased the migration of A549 and H1299 cells, while SIN1 knockdown reduced their migration. In a tumor xenograft model, overexpression of SIN1 promoted tumor growth of A549 cells in vivo, while SIN1 knockdown suppresses the tumor growth. We also found a mechanistic link between SIN1 and H3K4me3, H3K4me3 is involved in SIN1 upregulation. Moreover, SIN1 can significantly promote the in vitro migration and invasion of NSCLC cells via induction epithelial mesenchymal transition (EMT) process, which subsequently leads to transcriptional downregulation of epithelial marker E-cadherin and upregulation of mesenchymal markers N-cadherin and Vimentin expression. Together, our results reveal that SIN1 plays an important role in NSCLC and SIN1 is a potential biomarker and a promising target in the treatment of NSCLC.

  18. "Hospital Universitàri Vall d'Hebron" edificio de 50 años de antigüedad ¿puede ser sostenible?

    OpenAIRE

    Soler López, Esther

    2012-01-01

    El objeto del proyecto es valorar, definir y proponer, el compromiso y la trayectoria sobre sostenibilidad medioambiental que tiene el “Hospital Universitari Vall d’Hebron” de Barcelona. Como herramienta de valoración se ha utilizado la certificación BREEAM ES Salud, por considerarse un elemento lo suficientemente extenso y comprometido en el tema se sostenibilidad de un edificio hospitalario en uso. BREEAM ES Salud, estudia diez categorías a las que otorga una puntuación se...

  19. Potential of bioclimatic architecture for energy saving in buildings; Potencial de la arquitectura bioclimatica para ahorro de energia en edificios

    Energy Technology Data Exchange (ETDEWEB)

    Garcia Chavez, Jose Roberto [Universidad Autonoma Metropolitana-Azcapotzalco, Mexico, D. F. (Mexico)

    1994-12-31

    The design and construction of current buildings has been characterized, most of all, in the last 30 years, for the lack of consideration in the design process of aspects that nowadays represent a fundamental importance. These aspects are related to energy conservation and environmental protection, with man as the main center of attention for the optimum satisfaction of its physiological as well as psychological needs. In this paper are presented the causes for the lack of consideration of the mentioned aspects and guidelines to follow are set forth for their integration in the design process. Also the architecture potential with a bioclimatic approach is analyzed, for energy saving in buildings. [Espanol] El diseno y construccion de edificios contemporaneos se ha caracterizado, sobre todo en los ultimos treinta anos, por la falta de consideracion en el proceso de diseno, de aspectos que hoy en dia revisten una importancia primordial. Estos aspectos se relacionan con la preservacion de la energia y del medio ambiente, teniendo al hombre como principal centro de atencion, para la satisfaccion optima de sus necesidades, tanto fisiologicas como psicologicas. En este trabajo, se presentan las causas de la falta de consideracion de los aspectos antes citados y se plantean las pautas a seguir para su integracion en el proceso de diseno. Asi mismo, se analiza el potencial de la arquitectura con un enfoque bioclimatico, para ahorro de energia en los edificios.

  20. Plan de Autoprotección del Edificio B8 del Parque Científico y Tecnológico de Gipuzkoa

    OpenAIRE

    Alonso-Etxarri, Alexander

    2015-01-01

    El presente trabajo tiene como objetivo la elaboración de un Plan de Autoprotección para uno de los edificios del Parque Científico y Tecnológico de Gipuzkoa. Se entiende como autoprotección el sistema de acciones y medidas encaminadas a prevenir y controlar los riesgos sobre las personas y los bienes, a dar respuesta adecuada a las posibles situaciones de emergencia y a garantizar la integración de estas actuaciones en el sistema público de protección civil. Por tanto, una vez descrito el ed...

  1. Measurement of sin2θw and ϱ in deep inelastic neutrino-nucleon scattering

    Science.gov (United States)

    Reutens, P. G.; Merritt, F. S.; Macfarlane, D. B.; Messner, R. L.; Novikoff, D. B.; Purohit, M. V.; Blair, R. E.; Sciulli, F. J.; Shaevitz, M. H.; Fisk, H. E.; Fukushima, Y.; Jin, B. N.; Kondo, T.; Rapidis, P. A.; Yovanovitch, D. D.; Bodek, A.; Coleman, R. N.; Marsh, W. L.; Fackler, O. D.; Jenkins, K. A.

    1985-03-01

    We describe a high statistics measurement from deep inelastic neutrino-nucleon scattering of the electroweak parameters ϱ and sin2θw, performed in the Fermilab narrow-band neutrino beam. Our measurement uses a radius-dependent cut in y = EH/Ev which reduces the systematic error in sin2θw, and incorporates electromagnetic and electroweak radiative corrections. In a renormalization scheme where sin2θw ≡ 1-m2W/m2Z, a value of sin2θw = 0.242+/-0.011+/-0.005 is obtained fixing ϱ = 1. If both sin2θw and ϱ are allowed to vary in a fit to our data, we measure ϱ = 0.991 +/- 0.025 +/- 0.009. Present address: IBM Thomas J. Watson Research Center, PO Box 218, Yorktown Heights, NY 10598, USA.

  2. Neuronal networks for the study of buildings thermal behavior; Redes neuronales para el estudio del comportamiento termico de edificios

    Energy Technology Data Exchange (ETDEWEB)

    Marincic, Irene [Universidad de Sonora (Mexico); Del Rio, J. Antonio [Centro Morelense de Innovacion y Transferencia Tecnologica (Mexico)

    2009-07-15

    The evaluation as well as the prediction of buildings thermal behavior involves complex calculations mainly because of its enormous number of variables, many of them difficult to determine. For this type of problems, a possibility is to resort to models of the black box type, that allow the characterization of the building with very few variables, for then to be able to predict its behavior under other circumstances, with greater certainty. One of the black box models of more and more used in diverse disciplines, is the one of the artificial neuronal networks (ANN). These can be used as an alternative method of analysis and prediction, particularly for cases in which many variables take part. In this work a preliminary study is presented that analyzes the accuracy of a model of neuronal network for the prediction of the inside temperatures of a building, given the outside temperatures. A very simple network, of 3 neurons, located in 2 layers is considered. The results of the inside temperatures obtained in the learning as well as in the prediction stage are analyzed, comparing them with the ones obtained using another model of black box previously developed by the authors, the one of the function responded in the dominion of frequencies. [Spanish] Tanto la evaluacion como la prediccion del comportamiento termico de los edificios involucra calculos complejos sobre todo por su enorme numero de variables, muchas de ellas dificiles de determinar. Para este tipo de problemas, una posibilidad es recurrir a modelos del tipo caja negra, que permiten caracterizar al edificio como muy pocas variables, para luego poder predecir su comportamiento bajo otras circunstancias, como mayor certeza. Uno de los modelos de caja negra cada vez mas utilizado en diversas disciplinas, es el de las redes neuronales artificiales (ANN). Estas pueden ser usadas como metodo alternativo de analisis y sobre todo de prediccion, particularmente para los casos en que intervienen muchas variables. En

  3. Interaction between NBS1 and the mTOR/Rictor/SIN1 complex through specific domains.

    Directory of Open Access Journals (Sweden)

    Jian-Qiu Wang

    Full Text Available Nijmegen breakage syndrome (NBS is a chromosomal-instability syndrome. The NBS gene product, NBS1 (p95 or nibrin, is a part of the Mre11-Rad50-NBS1 complex. SIN1 is a component of the mTOR/Rictor/SIN1 complex mediating the activation of Akt. Here we show that NBS1 interacted with mTOR, Rictor, and SIN1. The specific domains of mTOR, Rictor, or SIN1 interacted with the internal domain (a.a. 221-402 of NBS1. Sucrose density gradient showed that NBS1 was located in the same fractions as the mTOR/Rictor/SIN1 complex. Knockdown of NBS1 decreased the levels of phosphorylated Akt and its downstream targets. Ionizing radiation (IR increased the NBS1 levels and activated Akt activity. These results demonstrate that NBS1 interacts with the mTOR/Rictor/SIN1 complex through the a.a. 221-402 domain and contributes to the activation of Akt activity.

  4. The Swiss Institute for Nuclear Research SIN

    CERN Document Server

    Pritzker, Andreas

    2014-01-01

    This book tells the story of the Swiss Institute for Nuclear Research (SIN). The institute was founded in 1968 and became part of the Paul Scherrer Institute (PSI) in 1988. Its founding occurred at a time when physics was generally considered the key discipline for technological and social development. This step was unusual for a small country like Switzerland and showed courage and foresight. Equally unusual were the accomplishments of SIN, compared with similar institutes in the rest of the world, as well as its influence on Swiss, and partially also on international politics of science. That this story is now available in a widely understandable form is due to the efforts of some physicists, who took the initiative as long as contemporary witnesses could still be questioned. As is usually the case, official documents always show just an excerpt of what really happened. An intimate portrayal of people who contributed to success requires personal memories. This text relies on both sources. In addition, the e...

  5. Bicarbonate Plays a Critical Role in the Generation of Cytotoxicity during SIN-1 Decomposition in Culture Medium

    Directory of Open Access Journals (Sweden)

    Kyo Shirai

    2012-01-01

    Full Text Available 3-Morpholinosydnonimine (SIN-1 is used as a donor of peroxynitrite (ONOO− in various studies. We demonstrated, however, that, the cell-culture medium remains cytotoxic to PC12 cells even after almost complete SIN-1 decomposition, suggesting that reaction product(s in the medium, rather than ONOO−, exert cytotoxic effects. Here, we clarified that significant cytotoxicity persists after SIN-1 decomposes in bicarbonate, a component of the culture medium, but not in NaOH. Cytotoxic SIN-1-decomposed bicarbonate, which lacks both oxidizing and nitrosating activities, degrades to innocuous state over time. The extent of SIN-1 cytotoxicity, irrespective of its fresh or decomposed state, appears to depend on the total number of initial SIN-1 molecules per cell, rather than its concentration, and involves oxidative/nitrosative stress-related cell damage. These results suggest that, despite its low abundance, the bicarbonate-dependent cytotoxic substance that accumulates in the medium during SIN-1 breakdown is the cytotoxic entity of SIN-1.

  6. Análisis del comportamiento sísmico de los edificios de obra de fábrica, típicos del distrito Eixample de Barcelona

    Directory of Open Access Journals (Sweden)

    Moreno-González, R.

    2011-12-01

    Full Text Available In this work a study about the vulnerability and seismic risk of the unreinforced masonry buildings, widely, existent in the Eixample district of Barcelona, Spain, is carried out. The buildings, here, analyzed are real and detailed structural drawings and reports have been used to model them. The seismic risk is evaluated by means of a mechanical model, based in the Capacity Spectrum Method. The seismic demand is described by elastic response spectrum defined by the Eurocode-8. Fragility curves are obtained from a nonlinear analysis, considering the capacity spectra. Expected seismic damage is gotten with the damage probability matrices. The analysis of the buildings has been performed by TreMuri program by means of a macro-element model. The results shown a considerable vulnerability in this type of buildings, therefore, in spite of the seismic hazard, the expected seismic risk is significant.

    En este trabajo se realiza un estudio para evaluar la vulnerabilidad y el riesgo sísmico de los edificios de obra de fábrica de ladrillo ampliamente existentes en el distrito Eixample de Barcelona, España. Los edificios analizados son reales y se dispone de planos e informes específicos. El análisis del riesgo sísmico se lleva a cabo mediante un método mecánico basado en el Método del Espectro de Capacidad. La demanda sísmica se define a partir del espectro elástico de respuesta definido por el Eurocódigo-8. Las curvas de fragilidad se obtienen a partir de un análisis no lineal, teniendo en cuenta los espectros de capacidad. El dano sísmico esperado se consigue con las matrices de probabilidad de daño. La modelización de los edificios se realiza con el programa TreMuri mediante un modelo de macroelementos. Los resultados obtenidos muestran una vulnerabilidad importante, teniendo en cuenta el escenario sísmico considerado, el riesgo sísmico esperado es alto.

  7. Factores que afectan la salud en los edificios

    OpenAIRE

    Medina Teófilo, Soraya

    2014-01-01

    Las directrices de construcción hoy día van enfocadas en la innovación de los sistemas y aplicaciones constructivas, donde la tecnología es el factor determinante. Las nuevas tecnologías de la construcción tratan básicamente de facilitar al máximo, el desarrollo y la trasformación de la vida de los seres humanos y la nueva composición de la sociedad. Todo esto dirigido a facilitar y mejorar la calidad de vida de los personas, sin advertir la calidad biológica del espacio. Desatando una ser...

  8. Juan Gelman: Del poeta-legislador a una lengua sin estado

    Directory of Open Access Journals (Sweden)

    Miguel Angel Dalmaroni

    2000-11-01

    Full Text Available La poesía de Gelman transforma el mandato de la tradición de la poesía política con que se inicia su obra, al reemplazarlo por la construcción de una lengua sin estado. La voz de esa tradición se desliza hacia una lengua que problematiza el reconocimiento pero resulta -a la vez- de una disonancia legible, y que se lee en las formas de una voz desalineada respecto de un sujeto, e imaginada como superposición entre figuras que proporcionan, desde el nivel de la representación, orientación constructivas de la escritura e indicación de lectura: el niño; el extranjero sin estado y sin lengua (inmigrante, exiliado, judío, etc.; el estado instable del español literario de la época de la conquista y especialmente el de los místicos; las locas o el loco, el incestuoso. Se propone leer esas figuras como una constelación móvil de confusiones que opera siempre en torno de la identidad: que la toma y la abandona en un movimiento que discute y, a la vez, utiliza las figuras sin estado que ocurren y a un tiempo se sustituyen entre sí. La identidad no resulta negada sino reemplazada cada vez que se le entrega, como en una estrategia momentánea de reposo, el terreno del poema.

  9. Juan Gelman: Del poeta-legislador a una lengua sin estado

    Directory of Open Access Journals (Sweden)

    Miguel Angel Dalmaroni

    2001-11-01

    Full Text Available La poesía de Gelman transforma el mandato de la tradición de la poesía política con que se inicia su obra, al reemplazarlo por la construcción de una lengua sin estado. La voz de esa tradición se desliza hacia una lengua que problematiza el reconocimiento pero resulta -a la vez- de una disonancia legible, y que se lee en las formas de una voz desalineada respecto de un sujeto, e imaginada como superposición entre figuras que proporcionan, desde el nivel de la representación, orientación constructivas de la escritura e indicación de lectura: el niño; el extranjero sin estado y sin lengua (inmigrante, exiliado, judío, etc.; el estado instable del español literario de la época de la conquista y especialmente el de los místicos; las locas o el loco, el incestuoso. Se propone leer esas figuras como una constelación móvil de confusiones que opera siempre en torno de la identidad: que la toma y la abandona en un movimiento que discute y, a la vez, utiliza las figuras sin estado que ocurren y a un tiempo se sustituyen entre sí. La identidad no resulta negada sino reemplazada cada vez que se le entrega, como en una estrategia momentánea de reposo, el terreno del poema.

  10. Destroying God's Temple? Physical Inactivity, Poor Diet, Obesity, and Other "Sin" Behaviors.

    Science.gov (United States)

    Faries, Mark D; McClendon, Megan; Jones, Eric J

    2017-02-17

    On average, our participants (N = 112), who self-proclaimed to be Christians, believed that physically inactive lifestyles, unhealthy eating, overeating, and being obese destroy the body, God's temple. However, these beliefs were less definitive, than those of other common "sin" behaviors, such as drug use, smoking, and excessive drinking of alcohol. In addition, destroying the body with physical inactivity or poor diet was not necessarily viewed as sinful. Subsequently, these beliefs did not relate to self-reported physical activity, dietary behavior, or body mass index. It is possible that inactivity, poor dietary habits, and obesity are not internalized into the spiritual perspective as destroying the body, God's temple, in the same way as other "sin" behaviors.

  11. [[Abortion: An Unforgivable Sin?].

    Science.gov (United States)

    Lalli, Chiara

    Abortion has become something to hide, something you can't tell other people, something you have to expiate forever. Besides, abortion is more and more difficult to achieve because of the raising average of consciencious objection (from 70 to 90% of health care providers are conscientious objectors, 2014 data, Ministero della Salute) and illegal abortion is "coming back"from the 70s, when abortion was a crime (Italian law n. 194/1978). Abortion is often blamed as a murder, an unforgivenable sin, even as genocide. Silence against shouting "killers!" to women who are going to have an abortion: this is a common actual scenario. Why is it so difficult to discuss and even to mention abortion?

  12. El Edificio Alto de los Pinos: una aproximación al espacio doméstico en Salmona desde el límite de la vivienda colectiva

    Directory of Open Access Journals (Sweden)

    Ingrid Quintana Guerrero

    2010-12-01

    Full Text Available ¿Es posible identificar el espacio doméstico en un proyecto determinado mediante la búsqueda de sus límites? Para responder a ello el artículo propone una reflexión desde algunos autores reconocidos en la fenomenología, principalmente Henry Maldiney (inspirado a su vez en Merleau-Ponty, debido a la importancia que otorga tanto al cuerpo y su movimiento en la concepción y posterior vivencia del hábitat como a los pares dialécticos, donde residen las dimensiones profundas de la arquitectura. Dicha reflexión se convierte en el sustrato teórico del recorrido imaginario presentado, a través de un proyecto de vivienda colectiva de Rogelio Salmona. En el Edificio Alto de los Pinos se encuentran estrategias similares que en otros proyectos de su autoría, donde el límite se fundamenta en las nociones de acontecimiento y errancia. La idea del edificio multifamiliar como una casa reinterpretada sienta las bases para el enriquecimiento de estudios y propuestas en torno al tema de la habitación contemporánea.

  13. Aerogenerador instalado en edificio multifamiliar: ¿Rentable o no? ¿Sostenible o no?

    Directory of Open Access Journals (Sweden)

    Guillermo Linares

    2016-01-01

    Full Text Available El propósito de este estudio fue determinar la sustentabilidad económica y ambiental de un aerogenerador horizontal prototipo instalado en un edificio multifamiliar. La sustentabilidad económica se determinó por estudio económico clásico primario y la sustentabilidad ambiental utilizando el enfoque emergético. El análisis económico clásico indica que el proyecto no es rentable (VAN = -2971,05 dólares americanos y el análisis ambiental (porcentaje de renovabilidad: 0,18; tasa de rendimiento de emergía: 1,23; tasa de carga ambiental: 4,48; índice de sustentabilidad energética: 0,275; relación de inversión energética: 4,35 y tasa de intercambio emergético: 0,32 indica una elevada dependencia del sistema respecto a maquinarias importadas, eficiencia media respecto al aprovechamiento de recursos locales en beneficio de la sociedad, bajo impacto ambiental y un costo de producción medio respecto a otros procesos de producción de electricidad.

  14. L'interazione edificio-città / The interaction between the building and the city

    Directory of Open Access Journals (Sweden)

    Carlo Gandolfi

    2014-01-01

    Full Text Available Per Niemeyer l'architettura è un tutt'uno con la città e il territorio. Tema cruciale per analizzare questa relazione sono le modalità attraverso le quali separa l'edificio dallo spazio aperto e dalla città. Ci troviamo di fronte ad una ricerca che supera di molto la semplice evoluzione di Le Corbusier e la semplice capacità scultorea che gli è stata attribuita: quella di Niemeyer è una composizione di grande respiro, in continua evoluzione e tensione con la città e con il paesaggio. / For Niemeyer architecture is a whole with the city and the territory. The ways through which he separates the building from the open space and from the city are a crucial issue to analyse this relationship. We find ourselves in front of a research that superates by far the simple evolution of Le Corbusier and the simple sculptural ability that was attributed to it: the one by Niemeyer is a wide breath composition, with an ongoing evolution and tension with the city and the landscape.

  15. ¿Cirugía coronaria sin bomba para todos?

    Directory of Open Access Journals (Sweden)

    José María Melero Tejedor

    2006-10-01

    Full Text Available En la pasada década importantes desarrollos técnicos han hecho posible que la cirugía coronaria sin circulación extracorpórea se convierta en un procedimiento rutinario y reproducible. Se presenta la evolución de esta técnica en nuestro hospital durante estos 10 años, el protocolo quirúrgico utilizado, los resultados obtenidos y las motivaciones para extender su uso a todos los pacientes. A pesar de las controversias suscitadas, se espera que la cirugía coronaria sin circulación extracorpórea continúe expandiéndose y los futuros cirujanos cardíacos deben estar preparados para ello.

  16. Temporal Analysis of Andes Virus and Sin Nombre Virus Infections of Syrian Hamsters

    Science.gov (United States)

    2007-05-01

    Microbiology . All Rights Reserved. Temporal Analysis of Andes Virus and Sin Nombre Virus Infections of Syrian Hamsters Victoria Wahl-Jensen,1 Jennifer...Ye, C., J. Prescott , R. Nofchissey, D. Goade, and B. Hjelle. 2004. Neutralizing antibodies and Sin Nombre virus RNA after recovery from hantavirus

  17. Comparative analysis of the indexes of electric power density in buildings lighting systems; Analisis comparativo de los indices de densidad de potencia electrica de los sistemas de alumbrado en edificios

    Energy Technology Data Exchange (ETDEWEB)

    Cruz Hernandez, J.I.; Morillon Galvez, D. [CONAE, Mexico, D. F. (Mexico)

    1995-12-31

    The national situation of the lighting systems in buildings is presented in order to know its consumption and make comparisons in accordance with the terms of the Electric Power Density that the lighting systems must satisfy, recently published in the norm, NOM 007 ENER-1995 (Energy Efficiency for non Residential Buildings` Lighting Systems). The form of application of the norm to determine the Electric Power Density Indexes in Lighting Buildings (EPDIL) is described, which permitted to know the current situation of the lighting systems, to compare the results internationally and with the ones specified in the proper norm. As a conclusion, there is the need of enhancing the efficiency of the lightning systems, with savings technologies, improve the lightning levels and equalize the energy indexes of the EPDIL with the ones recommended. [Espanol] Se presenta un estudio sobre la situacion nacional de los sistemas de alumbrado en edificios, con el objeto de conocer su consumo y compararlos, de acuerdo a los terminos de densidad de potencia electrica que deben cumplir los sistemas de alumbrado, publicados recientemente en la norma, NOM 007 ENER-1995 (Eficiencia Energetica para los Sistemas de Alumbrado en Edificios no Residenciales). Se describe la forma de aplicar la norma para determinar los indices de densidad de potencia electrica en alumbrado (DPEA) en edificios, lo cual permitio conocer la situacion actual de los sistemas de alumbrado, comparar con los reportados internacionalmente y con los especificados en la propia norma. Como conclusion se tiene la necesidad de eficientizar los sistemas de alumbrado, con tecnologia ahorradora, mejorar los niveles de iluminacion e igualar los indices energeticos de DPEA con los recomendados.

  18. Comparative analysis of the indexes of electric power density in buildings lighting systems; Analisis comparativo de los indices de densidad de potencia electrica de los sistemas de alumbrado en edificios

    Energy Technology Data Exchange (ETDEWEB)

    Cruz Hernandez, J I; Morillon Galvez, D [CONAE, Mexico, D. F. (Mexico)

    1996-12-31

    The national situation of the lighting systems in buildings is presented in order to know its consumption and make comparisons in accordance with the terms of the Electric Power Density that the lighting systems must satisfy, recently published in the norm, NOM 007 ENER-1995 (Energy Efficiency for non Residential Buildings` Lighting Systems). The form of application of the norm to determine the Electric Power Density Indexes in Lighting Buildings (EPDIL) is described, which permitted to know the current situation of the lighting systems, to compare the results internationally and with the ones specified in the proper norm. As a conclusion, there is the need of enhancing the efficiency of the lightning systems, with savings technologies, improve the lightning levels and equalize the energy indexes of the EPDIL with the ones recommended. [Espanol] Se presenta un estudio sobre la situacion nacional de los sistemas de alumbrado en edificios, con el objeto de conocer su consumo y compararlos, de acuerdo a los terminos de densidad de potencia electrica que deben cumplir los sistemas de alumbrado, publicados recientemente en la norma, NOM 007 ENER-1995 (Eficiencia Energetica para los Sistemas de Alumbrado en Edificios no Residenciales). Se describe la forma de aplicar la norma para determinar los indices de densidad de potencia electrica en alumbrado (DPEA) en edificios, lo cual permitio conocer la situacion actual de los sistemas de alumbrado, comparar con los reportados internacionalmente y con los especificados en la propia norma. Como conclusion se tiene la necesidad de eficientizar los sistemas de alumbrado, con tecnologia ahorradora, mejorar los niveles de iluminacion e igualar los indices energeticos de DPEA con los recomendados.

  19. Reinforced Concrete Buildings Following NSR-10 vs Quetame Earthquake Registered on Bogotá D.C. Edificios de concreto reforzado siguiendo la NSR-10 vs sismo de Quetame registrado en Bogotá D.C.

    Directory of Open Access Journals (Sweden)

    D M Ruiz

    2012-12-01

    Full Text Available A three dimensional nonlinear dynamic analysis of 6 concrete reinforcedbuildings of 5, 12 and 20 stories, designed according to NSR-10 and seismicresponse zoning for Bogotá 2010 version is presented. These 6 buildings weresubjected to 78 seismic signals of the Quetame earthquake (2008 registeredin 26 stations of the Bogotá’s accelerometer array (RAB. “Piedmont-B” and“Lacustrine-500” absolute acceleration design response spectra from the seismic response zoning of Bogota (2010 were used to design buildings analyzed.Plastic hinges were defined and assigned to each of the structural elementsof the 6 buildings, and for columns the interaction diagrams were establishedtoo. With these nonlinear parameters, the 6 structures were subject simultaneously to the time history registers North-South, East-West and vertical.For each building and for each seismic register the performance levels, the interstory drifts, roof displacements and base shear demanded were determined.With this information seismic demand maps were plotted for Bogota for eachone of buildings. The results suggest that, buildings designed under the newrules to Bogotá and provisions of NSR-10, develop strong damage level, related to limit states, such as: “llife security” for low-magnitude quake, was theQuetame earthquake, so far, from the design scenario.Se presenta el análisis no lineal dinámico en tres direcciones de 6 edificiosde concreto reforzado de 5, 12 y 20 pisos, diseñados con la NSR-10 yla zonificación de respuesta sísmica de Bogotá del año 2010. Estos 6 edificios,con planta típica idéntica, fueron sometidos a 78 señales sísmicas del sismo deQuetame (año 2008 registradas por 26 estaciones de la red de acelerógrafosde Bogotá (RAB. Para el diseño de los edificios se utilizaron los espectros derespuesta de aceleración absoluta para las zonas: «Piedemonte-B» y «Lacustre-500» de la microzonificación sísmica de Bogotá. Posteriormente, se

  20. El Islam en el mundo árabe: respuesta a una globalización excluyente

    OpenAIRE

    Duro Montealegre, Rosa

    2004-01-01

    Desde hace varios siglos la memoria histórica y los clichés han impuesto la visión de un mundo occidental que ha propugnado un estado de ignorancia frente al Islam y a su naturaleza que es difícil cambiar, sobre todo cuando los procesos de ideologización y demonización de la realidad islámica se encuentran con este nuevo orden mundial, establecido tras la caída del muro de Berlín y la disolución del bloque comunista, lo cual, sin duda, configura un panorama geopolítico, destinado a representa...

  1. Original Sin and T. E. Hulme's Aesthetics

    Science.gov (United States)

    Kishler, Thomas C.

    1976-01-01

    T. E. Hulme, a vigorous opponent of romanticism in art, poetry, and philosophy, insisted that the underlying flaw of the romantic view was its rejection of the dogma of Original Sin and the fall of man. His views are explored for the significant bearing they have on the development of aesthetic insight and indirectly on value and outlook.…

  2. Notes on "bioethics and sin" by Jean-Francois Collange.

    Science.gov (United States)

    Cozby, Dimitri

    2005-08-01

    Placing the notion of sin in the context of a meontic account of evil, and emphasizing the effect of sin on the sinner himself, this commentary exposes the insufficiency of restricting oneself to human efforts at atonement, and of thus underemphasizing the role of Christ. Collange's claim that the teaching of "predestination" is rooted in Paul and that the doctrine of merits and indulgences is rooted in Augustine is criticized, and Luther's "forensic" understanding is linked with Augustine, rather than with Paul. Collange's reduction of the concern for holiness to respect and trust is contrasted with holiness's essential context of loving unification with God. The commentary closes by exposing the unsatisfactory scantiness of Collange's treatment of cloning, health-care economy, and of the evils of life.

  3. Síndrome urémico hemolítico asociado a diarrea sin trombocitopenia

    Directory of Open Access Journals (Sweden)

    Alejandro Balestracci

    2017-09-01

    Conclusiones: La prevalencia de SUH D+ sin trombocitopenia fue del 5,6% y la mayoría de los casos fueron leves; sin embargo, el requerimiento de diálisis en uno de ellos señala que la normalización del recuento de plaquetas no siempre es un marcador preciso de resolución de la enfermedad. Nuestros resultados también confirman que el momento de presentación de los pacientes con SUH D+ sin trombocitopenia está usualmente alejado de los primeros síntomas intestinales, por lo que es necesario un alto índice de sospecha diagnóstica.

  4. Edificio de la Sociedad “La Rinascente”,en Roma, Italia

    Directory of Open Access Journals (Sweden)

    Albini, Franco

    1966-07-01

    Full Text Available This building has three levels below ground and seven floors above the ground. The power plant for various installations and storerooms are in the lowest basement, the dressing rooms for the staff and merchandise stores are in the second basement, and a supermarket occupies the first one. The ground floor and the next four floors are salesrooms and other offices connected with sales, whilst the top floor houses the company's headquarters. Because of its design and layout, and its general construction, this is one of the most refined and complex buildings that has been recently completed in Rome.Consta de: tres plantas de sótanos, planta baja y seis plantas sobre el nivel del suelo. El tercer sótano alberga las centrales de las instalaciones y almacenes de mercancías; el segundo sótano, los servicios, vestuarios de los empleados y almacenes de mercancías, y en el primero hay un supermercado. La planta baja y las cuatro primeras plantas están dedicadas a salas de venta; la quinta, a almacén de mercancías, y la sexta aloja las oficinas de la Sede de la Sociedad. El edificio, por su concepción, tratamiento y diseño, es uno de los más refinados y complejos que se ha construido en Roma durante los últimos años.

  5. Propuesta de mejora de la productividad en la construcción de edificio multifamiliar mediante la aplicación de cartas balance

    OpenAIRE

    Retuerto Pariamachi, Hugo; Retuerto Pariamachi, Hugo; Retuerto Pariamachi, Hugo

    2015-01-01

    En la actualidad se vienen ejecutando muchos proyectos de construcción en el Perú, siendo la mayor preocupación del constructor obtener la mayor rentabilidad posible. Dicha rentabilidad depende de muchos factores siendo uno de los más importantes la productividad obtenida durante el desarrollo del proyecto. Dado esto, el tema de la presente tesis se refiere al análisis y una propuesta de mejora de la productividad en la construcción de un edificio multifamiliar mediante la aplicación de carta...

  6. A Critical Investigation of the Relationship between Death and Sin in the Works of St. Augustine

    Directory of Open Access Journals (Sweden)

    Ghasem kakaie

    2016-09-01

    Full Text Available Death has been an everlasting human question. It has been regarded as one of the existential and human epistemic concerns both in religions and various philosophical and theological schools. The question of death in the works of Saint Augustine has been largely dismissed by scholars. Scrutinizing his oeuvre indicates that compared to his predecessors and based on his approach to Christianity, specifically to St. Paul’s doctrines, Augustine is more attentive to the relation between death and sin. In his works, he justifies death based on the original sin as well as those everyday sins that committed by human being throughout her life, identifying sin as the cause of death. Accordingly, he prefers moral causes rather than natural causes resulting in death. Augustine contends that there are three types of death, i.e. corporeal death (the separation of soul and body, spiritual death (separation of human being and God due to sin, and the eternal death (in which soul remains in body, bearing the burden of eternal corporeal punishment away from God. He believes that God created a human being in a way according to which she would have benefited from eternal life if she had not sinned. However, now not only corporeal death but also the eternal death of soul are the consequences of sins. He opines that all human race, Except Jesus and his mother are the heirs of the original sin committed by Adam and Eve. In this way, every human being is born sinful, contaminated by the original. According to this viewpoint, the human race cannot be perceived as naturally innocent or away from intellectual mistake and deviation. Rather, human being and her thoughts and deeds can be understood only based on the doctrine of fall. In addition, the Adam’s original sin in not merely an event but it is a complicated circumstance imposed by God as a punishment of Adam and Eve due to their disobedience which is followed by different types of death as well as such

  7. Método de cálculo de comportamiento térmico de cerramientos de edificios con materiales de cambio de fase

    OpenAIRE

    Urresti González, Aitor

    2017-01-01

    331 p. El almacenamiento de energía térmica en forma de calor latente puede ser una buena medida para reducirla demanda tanto de refrigeración como de calefacción de los edificios. EL fuerte comportamiento nolineal de este tipo de almacenamiento requiere de un buen análisis previo de las propiedades para unaprovechamiento óptimo. El presente trabajo recoge todo el proceso de selección de un material decambio de fase: desde la medición de propiedades térmicas, pasando por la definición de u...

  8. Sucesos vitales estresantes en mujeres en situación sin hogar

    OpenAIRE

    Vázquez Cabrera, José Juan; Rodríguez Moreno, Sara Isabel; Roca Morales, Pablo; Panadero Herrero, Sonia

    2016-01-01

    Las Personas Sin Hogar (PSH) forman parte de un colectivo especialmente vulnerable al padecimiento de Sucesos Vitales Estresantes (SVE) a lo largo de la vida. Además, los escasos datos indican que las Mujeres Sin Hogar (MSH) presentan una mayor vulnerabilidad a sufrir dichos sucesos. El objetivo de este trabajo es analizar la prevalencia de SVE en un grupo de 138 MSH de la ciudad de Madrid. Los resultados apuntan que las MSH experimentan un número muy elevado de SVE tanto en la infancia/adole...

  9. Nuclear effects and the NuTeV sin2 θW measurement

    International Nuclear Information System (INIS)

    McFarland, K.S.; Zeller, G.P.; Adams, T.; Alton, A.; Avvakumov, S.; Barbaro, L. de; Barbaro, P. de; Bernstein, R.H.; Bodek, A.; Bolton, T.; Brau, J.; Buchholz, D.; Budd, H.; Bugel, L.; Conrad, J.; Drucker, R.B.; Fleming, B.T.; Frey, R.; Formaggio, J.A.; Goldman, J.; Goncharov, M.; Harris, D.A.; Johnson, R.A.; Kim, J.H.; Koutsoliotas, S.; Lamm, M.J.; Marsh, W.; Mason, D.; McDonald, J.; McNulty, C.; Naples, D.; Nienaber, P.; Radescu, V.; Romosan, A.; Sakumoto, W.K.; Schellman, H.; Shaevitz, M.H.; Spentzouris, P.; Stern, E.G.; Suwonjandee, N.; Tzanov, M.; Vakili, M.; Vaitaitis, A.; Yang, U.K.; Yu, J.; Zimmerman, E.D.

    2002-01-01

    NuTeV measures sin 2 θ W by comparing neutral and charged current cross-sections on a heavy nuclear target, and finds a value of sin 2 θ W (on-shell) = 0.2277 ± 0.0013(stat) ± 0.0009(syst), approximately 3σ from the predicted value. We discuss the possibility that nuclear effects on parton distribution functions or cross-sections may be responsible for the discrepancy

  10. El "martyrium" de la Epístola XXV de Gregorio de Nisa. Nueva propuesta de restitución de edificio

    Directory of Open Access Journals (Sweden)

    Sergio Vidal Álvarez

    2013-07-01

    Full Text Available A partir de la información que nos proporciona la Epístola XXV de Gregorio de Nisa (335-394/5 d.C., se pretende restablecer el sistema de proporciones que pudo regir al martyrium que Gregorio pretende construir en Nisa (Capadocia y del que no se conoce ninguna otra información. Según se indica en la epístola, el edificio debe seguir un esquema en planta de cruz griega con octógono central y cubierta cupulada, además de un peristilo, siguiendo los parámetros propios de la arquitectura cristiana martirial de la época. 

  11. Decrease in Accuracy of a Rotational SINS Caused by its Rotary Table's Errors

    Directory of Open Access Journals (Sweden)

    Pin Lv

    2014-05-01

    Full Text Available We call a strapdown inertial navigation system (SINS that uses the rotation auto-compensation technique (which is a common method to reduce the effect of the bias errors of inertial components a ‘rotational SINS’. In a rotational SINS, the rotary table is an important component, rotating the inertial sensor assembly back and forth in azimuth to accomplish error modulation. As a consequence of the manufacturing process, errors may exist in rotary tables which decrease the navigation accuracy of rotational SINSs. In this study, the errors of rotary tables are considered in terms of installation error, wobble error and angular error, and the models of these errors are established for the rotational SINS. Next, the propagation characteristics of these errors in the rotational SINS are analysed and their effects on navigation results are discussed. Finally, the theoretical conclusions are tested by numerical simulation. This paper supplies a good reference for the development of low-cost rotational SINSs, which usually have low accuracy rotary tables and which may be used in robots, intelligent vehicles and unmanned aerial vehicles (UAVs.

  12. Adaptive Federal Kalman Filtering for SINS/GPS Integrated System

    Institute of Scientific and Technical Information of China (English)

    杨勇; 缪玲娟

    2003-01-01

    A new adaptive federal Kalman filter for a strapdown integrated navigation system/global positioning system (SINS/GPS) is given. The developed federal Kalman filter is based on the trace operation of parameters estimation's error covariance matrix and the spectral radius of update measurement noise variance-covariance matrix for the proper choice of the filter weight and hence the filter gain factors. Theoretical analysis and results from simulation in which the SINS/GPS was compared to conventional Kalman filter are presented. Results show that the algorithm of this adaptive federal Kalman filter is simpler than that of the conventional one. Furthermore, it outperforms the conventional Kalman filter when the system is undertaken measurement malfunctions because of its possession of adaptive ability. This filter can be used in the vehicle integrated navigation system.

  13. Estudio técnico económico de alternativas del proceso de cimbrado y descimbrado en la construcción de un edificio de forjados de losa maciza de hormigón armado

    Directory of Open Access Journals (Sweden)

    Yezid Alvarado

    Full Text Available El objetivo del presente trabajo es definir diferentes alternativas de procesos constructivos, estimando cuáles resultan ser las más beneficiosas respecto a su plazo de ejecución y su coste, para un edificio de forjados de losa maciza de hormigón armado. Para resolver los plazos de ejecución se plantearon tres alternativas del proceso constructivo: Cimbrado y Descimbrado; Cimbrado, Clareado y Descimbrado; y Cimbrado, Recimbrado y Descimbrado, considerado 2, 3 y 4 plantas consecutivas apuntaladas. Para evaluar qué procesos son válidos, primero se calculan las cargas que se presentan durante el proceso constructivo mediante el Nuevo Procedimiento Simplificado y posteriormente se comprueba si se cumple o no, en cada una de las operaciones constructivas, la condición de descimbrado. Para el edificio objeto de estudio se han obtenido como procesos viables económica y técnicamente los procesos constructivos de Cimbrado, Clareado y Descimbrado con 3 y 4 plantas cimbradas.

  14. Production and characterization of Si-N films obtained by r.f. magnetron sputtering

    International Nuclear Information System (INIS)

    Oliveira, A.; Cavaleiro, A.; Vieira, M.T.

    1993-01-01

    Si-N films were deposited by sputtering from an Si 3 N 4 target with different deposition pressures and negative substrate bias. The films were amorphous and showed a ''featureless'' morphology. A high oxygen content was detected in unbiased films. For these films the Si/N ratio was very high compared with the target composition, whereas for biased films the opposite was observed. Si-N films presented cohesive failures for loads as high as 21 N and adhesive failure at 45 N when they were analysed by scratch test. Very high hardness (45 GPa) was obtained, particularly for biased films. Unbiased films were softer, which is attributed to the formation of silicon oxide and/or to a lower compressive stress level. (orig.)

  15. Propiedades térmicas e hídricas de materiales aislantes apropiadas para fábricas históricas = Thermal and hygric properties of insulation materials suitable for historic fabrics

    Directory of Open Access Journals (Sweden)

    Rosanne Walker

    2016-08-01

    Full Text Available Mejorar el rendimiento térmico de los edificios mediante la adaptación del aislamiento puede reducir la pérdida innecesaria de calor y energía minimizando el impacto ambiental. El aislamiento térmico interior es a menudo el elegido en los edificios históricos para preservar sus características. Sin embargo, el aislamiento interior puede aumentar la acumulación de humedad en paredes que socavan su durabilidad. Hay una falta de conocimiento sobre la eficacia de sólidos muros históricos y el impacto del aislamiento interno en su comportamiento higrotérmico. Este artículo investiga las propiedades térmicas e hídricas de siete opciones de aislamiento internos, incluyendo la pintura térmica, aerogel (AG, corcho-cal (CL, cal-cáñamo (HL, silicato de calcio bordo (CSB, tablero de fibra de madera (TFB y placa de polisocianurato (PIR. Sus propiedades se comparan con un enlucido de cal tradicional. El PIR y el aerogel AG muestran extraordinarias propiedades térmicas que contribuyen a la comodidad y ahorro de energía, y la CL y HL son permeables al vapor y a la capilaridad. Estos tienen aproximadamente el doble de la masa térmica de los otros aislantes. Además, la CL tiene una buena inercia térmica (segunda difusividad más baja y, a pesar de su contenido orgánico, una adsorción de baja a alta RH. Abstract Improving the thermal performance of buildings by retrofitting insulation can reduce unnecessary heat loss and building operational energy minimising environmental impact. Internal thermal insulation is often favoured for historic buildings to preserve their features. However, internal insulation may increase moisture accumulation in walls undermining their durability. There is a lack of knowledge on the performance of historic solid walls and the impact of internal insulation in their hygrothermal behaviour. This paper investigates the thermal and hygric properties of seven internal insulation options including thermal paint

  16. Vulnerabilidad y riesgo sísmico de los edificios residenciales estudiados dentro del Plan Especial de evaluación del riesgo sísmico en la Comunidad Valenciana

    Directory of Open Access Journals (Sweden)

    Serrano-Lanzarote, B.

    2015-09-01

    Full Text Available This paper presents a study about the seismic vulnerability of residential buildings in the Valencian region, as part of the Special Plan for the seismic risk. The regional government has the obligation to develop these type of plans in areas with seismic intensities higher than VII degrees, accord to the European Macroseismic Scale. The methodology used to identify the constructive characteristics in the region, age of buildings, to assign seismic vulnerability classes, to estimate potential damage caused by a probable earthquake and mapping the risk arising, is presented. We highlighted the estimation of an average high damage of 13 % of the number of buildings in the Alicante region, decreasing in Valencia and Castellon to 8 % and 0.2 %, respectively. To manage data a geodatabase has been created, managed by a Geographic Information System, a very effective tool, specially to the immediate response to multicriteria questions.Se presenta un estudio sobre la vulnerabilidad sísmica de edificios residenciales en la Comunidad Valenciana, como parte del Plan Especial frente al riesgo sísmico que dicha comunidad tiene obligación de elaborar al tener poblaciones con intensidades sísmicas superiores a VII grados, según la Escala Macrosísmica Europea. Se exponen los resultados y metodología seguida para identificar las características constructivas de la región, antigu.edad de sus edificios, asignar clases de vulnerabilidad sísmica, estimar daños potenciales ocasionados por un probable sismo, así como cartografiar el riesgo derivado. Se destaca la estimación de un daño grave del 13 % del número de edificios para la provincia de Alicante, disminuyendo en las provincias de Valencia y Castellón hasta el 8 % y el 0,2 %, respectivamente. Para la gestión de la información se ha creado una geodatabase, administrada por un Sistema de Información Geográfica, herramienta que ha resultado muy eficaz, especialmente para la respuesta inmediata a

  17. Determination of naturally occurring radionuclides in El-Sin Water

    International Nuclear Information System (INIS)

    Al-Masri, M.S.; Al-Rayyes, A.H.

    2000-01-01

    Naturally occurring radionuclides levels have been determined in El-Sin water for the period of 1995 and 1996. water samples were collected from four sites, which are the main drinking water sources of the area. Radon concentration was found to vary between 0.88 Bq/1 in Lattakia main water supply site and 8.4 Bq/1 in El-Sin springs.The highest values found for other radionuclides were 51.6 mBq/1, 18.6 mB/1 and 24.8 mBq/1 for sup 2 sup 2 sup 6 Ra, sup 2 sup 1 sup 0 Po and total uranium (sup 2 sup 3 sup 4 U and sup 2 sup 3 sup 8 U) respectively. These levels are much lower than the maximum permissible levels in drinking water set by international organization.(author)

  18. Una construcción elaborada con muros de papel y cartón comprimidos más otros residuos valorizables Una construcción elaborada con muros de papel y cartón comprimidos más otros residuos valorizables

    Directory of Open Access Journals (Sweden)

    Rodrigo González Enriquez

    2012-02-01

    Full Text Available We have built three walls of a room using recoverable waste (RW that was carefully selected in order to build three walls of room. This recoverable waste was extracted from recycling containers (previously installed in strategic places that were used to gather either paper or cardboard. The construction procedure that was used, is similar to the one used by the Bereberes (indigenous ethnic group of the northeast of Africa for their own houses. The main advantage of this type of housing is the use of recycled waste. This document will show the 16 year old construction that in present time is still occupied by a family and the walls are still in optimal condition in terms of its resistance and comfort.  Hemos construido tres muros de una habitación con papel, cartón y otros residuos valorizables (RV compactados y reforzados con castillos de concreto. Los residuos valorizables utilizados se extrajeron de tambos de basura (que previamente se instalaron en lugares estratégicos. El procedimiento de construcción que se utilizó fue semejante al que usan los Bereberes (grupos étnicos ubicados al norte de África en las construcciones de sus casas de tierra. Los objetivos principales son el reaprovechamiento de los desechos y la necesidad de vivienda. En este documento se mostrará una construcción con 16 años de edad que se encuentra actualmente habitada y en condiciones óptimas respecto a su estética, resistencia y comodidad.

  19. Dos edificios públicos a base de tierra en Chile

    Directory of Open Access Journals (Sweden)

    Pereira, Hugo

    1986-02-01

    Full Text Available Two works in Chile are reported: The House of the Culture in La Florida (Santiago and the Botalcura Concentred School in the Vlllth Zone. Both constructions have as common characteristic to be built with adobe and wooden girders, to present a certain continuity in the adapted criteria of desing -both from Architect Hugo Pereira- and to be newly constructed buildings, even partialy in construction. The fact that there are spaces with appropriate light and height for public use, so as the circumstance that the part which waas being constructed just at the moment of the great seism in Chile (February 1985 had and excelent behaviour, makes these works interesting to be published.Se presentan dos realizaciones en Chile: la Casa de la Cultura, en la barriada La Florida (Santiago y la Escuela Concentrada de Botalcura, en la VIII Región. Ambas construcciones tienen en común el haberse realizado a base de adobe y cerchas de madera, el presentar una cierta continuidad en los criterios de diseño adoptados, en ambas ha participado el Arquitecto Hugo Pereira, y ser edificios recién construidos, incluso parcialmente en construcción. El hecho de tratarse de espacios con luces y alturas propias de construcciones para uso público, así como la circunstancia de que la parte construida de la Casa de la Cultura en el momento del último gran sismo en Chile (marzo 1985, presentase un excelente comportamiento, son hechos que hacen especialmente interesante la publicación de estas realizaciones.

  20. Estructura de "Torres Blancas". Informes de la Construcción N° 226, 1970

    Directory of Open Access Journals (Sweden)

    Sáenz de Oiza, F.

    1998-10-01

    Full Text Available Not available

    En el artículo se describen los problemas estructurales de un edificio de viviendas, en general, analizando las condiciones de trabajo y el proceso de cálculo de esta estructura singular, para lo que se estudia separadamente la organización vertical y la horizontal. La primera está constituida por 46 pantallas resistentes —de formas diversas y espesores entre 15 y 20 cm— con plegamientos en los bordes, gracias a los cuales se logra, entre otras ventajas, reducir las tracciones horizontales y aumentar el coeficiente de seguridad al pandeo. La organización horizontal adoptada ha sido la de losas de espesores constantes —de 20 cm, con refuerzos de capiteles en las grandes zonas de terrazas— que valoran por igual cualquier dirección de flexión. Se detallan, por separado, las estructuras fundamental, del núcleo social superior, y de la zona inferior, donde existen cuatro partes importantes: muros, aparcamiento, pérgola y cimentación.

  1. Moving State Marine SINS Initial Alignment Based on High Degree CKF

    Directory of Open Access Journals (Sweden)

    Yong-Gang Zhang

    2014-01-01

    Full Text Available A new moving state marine initial alignment method of strap-down inertial navigation system (SINS is proposed based on high-degree cubature Kalman filter (CKF, which can capture higher order Taylor expansion terms of nonlinear alignment model than the existing third-degree CKF, unscented Kalman filter and central difference Kalman filter, and improve the accuracy of initial alignment under large heading misalignment angle condition. Simulation results show the efficiency and advantage of the proposed initial alignment method as compared with existing initial alignment methods for the moving state SINS initial alignment with large heading misalignment angle.

  2. SinEx DB: a database for single exon coding sequences in mammalian genomes.

    Science.gov (United States)

    Jorquera, Roddy; Ortiz, Rodrigo; Ossandon, F; Cárdenas, Juan Pablo; Sepúlveda, Rene; González, Carolina; Holmes, David S

    2016-01-01

    Eukaryotic genes are typically interrupted by intragenic, noncoding sequences termed introns. However, some genes lack introns in their coding sequence (CDS) and are generally known as 'single exon genes' (SEGs). In this work, a SEG is defined as a nuclear, protein-coding gene that lacks introns in its CDS. Whereas, many public databases of Eukaryotic multi-exon genes are available, there are only two specialized databases for SEGs. The present work addresses the need for a more extensive and diverse database by creating SinEx DB, a publicly available, searchable database of predicted SEGs from 10 completely sequenced mammalian genomes including human. SinEx DB houses the DNA and protein sequence information of these SEGs and includes their functional predictions (KOG) and the relative distribution of these functions within species. The information is stored in a relational database built with My SQL Server 5.1.33 and the complete dataset of SEG sequences and their functional predictions are available for downloading. SinEx DB can be interrogated by: (i) a browsable phylogenetic schema, (ii) carrying out BLAST searches to the in-house SinEx DB of SEGs and (iii) via an advanced search mode in which the database can be searched by key words and any combination of searches by species and predicted functions. SinEx DB provides a rich source of information for advancing our understanding of the evolution and function of SEGs.Database URL: www.sinex.cl. © The Author(s) 2016. Published by Oxford University Press.

  3. Centering Panama in Global Modernity: The Search for National Identity and the Imagining of the Orient in Rogelio Sinán’s “Sin novedad en Shanghai”

    Directory of Open Access Journals (Sweden)

    Junyoung Verónica Kim

    2013-06-01

    Full Text Available Since its independence from Colombia in 1903 backed by the United States government, which resulted in a treaty that granted the US free rein to build, administer and control what would be known as the Panama Canal, Panama’s quest for modern nationhood has been severely called into question. More often than not it is posited as an artificial state with little organic unity and limited sovereignty: a state that is literally made in the USA. Panamanian intellectuals, such as Rogelio Sinán, responded to these discourses on the Panamanian nation-state by actively constructing a Panamanian national identity, and by calling attention to the central significance of Panama in the twentieth-century world of global modernity. Questioning the widespread narrative of Panama as a peripheral North American neo-colony that was at best a marginal actor in international history, Sinán positioned Panama at the center of the modern world where World Wars, international migrations and global capitalism connected. By exploring Sinán’s short story “Sin novedad en Shanghai” that takes place in East Asia during World War II, this study argues that the writer’s deployment of the Orient—as a geopolitical, cultural, symbolic and imaginary space—allows him to reposition Panama. In its symbolic relation to this Orient, Panama emerges not as the backwaters of global modernity, but at its center—a cosmopolis between the Orient and the Occident that reveals a microcosm of the modern world.

  4. A structured workflow for mapping human Sin3 histone deacetylase complex interactions using Halo-MudPIT AP-MS.

    Science.gov (United States)

    Banks, Charles A S; Thornton, Janet L; Eubanks, Cassandra G; Adams, Mark K; Miah, Sayem; Boanca, Gina; Liu, Xingyu; Katt, Maria; Parmely, Tari; Florens, Laurence A; Washburn, Michael P

    2018-03-29

    Although a variety of affinity purification mass spectrometry (AP-MS) strategies have been used to investigate complex interactions, many of these are susceptible to artifacts due to substantial overexpression of the exogenously expressed bait protein. Here we present a logical and systematic workflow that uses the multifunctional Halo tag to assess the correct localization and behavior of tagged subunits of the Sin3 histone deacetylase complex prior to further AP-MS analysis. Using this workflow, we modified our tagging/expression strategy with 21.7% of the tagged bait proteins that we constructed, allowing us to quickly develop validated reagents. Specifically, we apply the workflow to map interactions between stably expressed versions of the Sin3 subunits SUDS3, SAP30 or SAP30L and other cellular proteins.  Here we show that the SAP30 and SAP30L paralogues strongly associate with the core Sin3 complex, but SAP30L has unique associations with the proteasome and the myelin sheath.  Next, we demonstrate an advancement of the complex NSAF (cNSAF) approach, in which normalization to the scaffold protein SIN3A accounts for variations in the proportion of each bait capturing Sin3 complexes and allows a comparison between different baits capturing the same protein complex. This analysis reveals that although the Sin3 subunit SUDS3 appears to be used in both SIN3A and SIN3B based complexes, the SAP30 subunit is not used in SIN3B based complexes. Intriguingly, we do not detect the Sin3 subunits SAP18 and SAP25 among the 128 high-confidence interactions identified, suggesting that these subunits may not be common to all versions of the Sin3 complex in human cells. This workflow provides the framework for building validated reagents to assemble quantitative interaction networks for chromatin remodeling complexes and provides novel insights into focused protein interaction networks. Published under license by The American Society for Biochemistry and Molecular Biology, Inc.

  5. Monarcas y súbditos ''sin cualidades''

    OpenAIRE

    Raminelli, Ronald

    2011-01-01

    En Brasil, no siempre los primeros colonizadores disponían del honor necesario para recibir los beneficios concedidos por el Rey. En general, cuando no se trataba de mestizos y mulatos, las elites locales se originaban en las antiguas cepas judías. Mismo siendo súbditos sin cualidad, los reyes les concedieron perdón y algunos privilegios. Los títulos de caballero concedidos a los mestizos e hijos ilegítimos permiten de alguna forma vislumbrar la debilidad de las fuerzas que unían a las partes...

  6. Estimación adaptable de estados en un edificio de marco plano equipado con un amortiguador magneto-reológico

    Directory of Open Access Journals (Sweden)

    René Jiménez-Fabián

    2008-01-01

    Full Text Available Resumen: Se presenta un observador adaptable para un edificio equipado con un amortiguador magneto-reológico. Este observador es capaz de reconstruir los parámetros estructurales, las posiciones y las velocidades absolutas de los pisos a partir de mediciones de aceleración. Estas señales son reconstruidas en forma explícita gracias a que el esquema propuesto no requiere de formas canónicas ni transformaciones de estados. El desempeño de este observador se ilustra con resultados experimentales obtenidos en una estructura de escala reducida. Palabras clave: Observador adaptable, amortiguador magneto-reológico, identificación de parámetros, control de estructuras

  7. Edificios inteligentes y sostenibles: arquitectura de percepción y control para la gestión de energía

    OpenAIRE

    Hernández Uribe, Óscar

    2016-01-01

    El sector de los edificios consume entre el 30% y el 40% de la energía mundial. En el caso de la Unión Europea, para satisfacer las necesidades del usuario, del total de energía usado en este tipo de instalaciones el consumo térmico representa más del 60%. Por otro lado, el cambio climático, la explosión demográfica, el incremento de la esperanza de vida, y la predicción de que dentro de un par de décadas el 80% de la población se concentrará en ciudades, son factores que exigen un nuevo para...

  8. Parametric excitation of a SiN membrane via piezoelectricity

    Directory of Open Access Journals (Sweden)

    Shuhui Wu

    2018-01-01

    Full Text Available We develop a stoichiometric silicon nitride (SiN membrane-based electromechanical system, in which the spring constant of the mechanical resonator can be dynamically controlled via piezoelectric actuation. The degenerate parametric amplifier is studied in this configuration. We observe the splitting of mechanical mode in the response spectra of a phase-sensitive parametric amplifier. In addition, we demonstrate that the quality factor Q of the membrane oscillator can be significantly enhanced by more than two orders of magnitude due to the coherent amplification, reaching an effective Q factor of ∼3 × 108 at room temperature. The nonlinear effect on the parametric amplification is also investigated, as well as the thermomechanical noise squeezing. This system offers the possibility to integrate electrical, optical and mechanical degrees of freedom without compromising the exceptional material properties of SiN membranes, and can be a useful platform for studying cavity optoelectromechanics.

  9. Parametric excitation of a SiN membrane via piezoelectricity

    Science.gov (United States)

    Wu, Shuhui; Sheng, Jiteng; Zhang, Xiaotian; Wu, Yuelong; Wu, Haibin

    2018-01-01

    We develop a stoichiometric silicon nitride (SiN) membrane-based electromechanical system, in which the spring constant of the mechanical resonator can be dynamically controlled via piezoelectric actuation. The degenerate parametric amplifier is studied in this configuration. We observe the splitting of mechanical mode in the response spectra of a phase-sensitive parametric amplifier. In addition, we demonstrate that the quality factor Q of the membrane oscillator can be significantly enhanced by more than two orders of magnitude due to the coherent amplification, reaching an effective Q factor of ˜3 × 108 at room temperature. The nonlinear effect on the parametric amplification is also investigated, as well as the thermomechanical noise squeezing. This system offers the possibility to integrate electrical, optical and mechanical degrees of freedom without compromising the exceptional material properties of SiN membranes, and can be a useful platform for studying cavity optoelectromechanics.

  10. Foamglas D. 1. T. N.° 19 Convalidación del Agrément 1. N. L n.° 1.031. Aislamiento de cubiertas isolation pour toitures roof insulation

    Directory of Open Access Journals (Sweden)

    Editorial, Equipo

    1968-11-01

    Full Text Available Not availableEl Foamglas es un material constituido por vidrio químicamente puro, de tipo boro-silicato, inorgánico, sin adición de aglomerante. Se presenta y utiliza en placas de diferentes dimensiones estandarizadas. Estas placas se colocan en cubiertas planas o con pendiente. Se unen con betún y se recubren con una impermeabilización. Otros empleos no considerados en el presente documento son: en el doblado de muros, en las cámaras frigoríficas, en las fachadas ligeras, falsos techos, en el aislamiento de depósitos de agua y tuberías.

  11. Advertising and the Seven Sins of Memory

    DEFF Research Database (Denmark)

    Percy, Larry

    2004-01-01

    A positive intention may be formed as a result of exposure to an advertisement, but if a memory malfunction interferes with that intention, the advertising will be ineffective.This paper considers the implications for advertisers of Daniel Schacter’s ‘seven sins of memory’: transcience, absent......-mindedness, blocking, misattribution, suggestibility, bias and persistence. Each of the ‘sins’ is explained in detail and advice provided for advertisers on how to avoid these pitfalls....

  12. High precision measurement of sin2theta/sub W/ in semi-leptonic neutrino interactions

    International Nuclear Information System (INIS)

    Guyot, C.

    1985-01-01

    The experiment has provided what is presently the most accurate measurement of sin 2 theta/sub W/. The errors are still too large for a significant test of the standard model and the measured value is in agreement with the measured values of M/sub W/ and M/sub Z/. On the other hand, this result can constrain the Grand Unified models. The standard SU(5) model predicts sin 2 theta/sub W//sup MS/ = 0.214 +/- 0.004 (the error comes from the uncertainty on Lambda/sub MS/), in very good agreement with the measured value. While this model has big problems with the proton lifetime, it could be saved by its supersymmetric extension. In the minimal SU(5) SUSY model (with 2 Higgs supermultiplets) sin 2 theta/sub W//sup MS/ = 0.233 +/- 0.004, [12] in bad agreement with the measured value. The addition of other Higgs supermultiplets increases the value of sin 2 theta/sub W/. Unless some unexpected large contribution from higher-twist terms occurs, the present measurement can already bring a significant constraint on Grand Unified models

  13. Indoor Pollution Emissions from Building Materials; Case of Study: Gypsum Boards Indoor Pollution Emissions from Building Materials; Case of Study: Gypsum Boards

    Directory of Open Access Journals (Sweden)

    Silverio Hernández Moreno

    2012-02-01

    Full Text Available Este reporte presenta una evaluación de las emisiones de materiales de construcción, al interior de los edificios que pueden causar daño a la salud de los usuarios durante la ocupación, pues emiten sustancias tóxicas al interior de los edificios. Este reporte presenta un caso de studio que evalúa a los tableros de yeso, frecuentemente usados en la construcción de muros divisorios y falsos plafones. La parte experimental se basa en un espacio tridimensional el cual simula un cuarto de cualquier tipo de edificación; por ejemplo: un salón de clases u oficina. Las condiciones ambientales al interior, tales como: ventilación, temperatura y humedad, afectan directamente las emisiones de sustancias químicas por los materiales de construcción. La metodología se basa en la comparación de materiales convencionales y materiales alternativos con distinta composición y similares características, en donde usamos métodos de prueba, condiciones ambientales, instrumentos y herramientas similares. Este es un estudio muy importante para entender los problemas relacionadoscon la contaminación ambiental, específicamente del aire y sus efectos en el interior de los edificios, y que se relaciona directamente con la salud pública e indirectamente con los sistemas constructivos y la selección de materiales en los edificios. Las pruebas concluyen que los materiales alternativos (de contenido reciclado son mejores que los tradicionales, porque reducen la contaminación del aire al interior de los edificios. This report presents an evaluation of emissions from indoor building materials that may cause health damage to the people who occupy the building, since these materials emit toxic chemicals into the air and indoor surfaces. This report presents a case study which evaluates Gypsum Boards, frequently used in the construction of dividing walls and ceilings. The experimental part of this report is based on a three-dimensional space that simulates a

  14. Análisis de la respuesta de edificios unifamiliares adosados de obra de fábrica sometidos a asentamientos inducidos por tunelación

    OpenAIRE

    Gálvez Buezo, Javier

    2012-01-01

    En el presente trabajo se estudia el comportamiento de la obra de fábrica como elemento estructural portante. La obra de fábrica es un material que por su constitución presenta una capacidad nula o prácticamente nula de resistir tracciones. Por ello, los edificios proyectados con este material se diseñan con formas geométricas priorizando las compresiones, como pueden ser las paredes de carga, los pilares, arcos y bóvedas. El problema resulta cuando, por razones imprevistas, la estructura ...

  15. Cele șapte păcate ale greenwashing-ului [The seven sins of greenwashing

    Directory of Open Access Journals (Sweden)

    Drăgoi M

    2016-12-01

    Full Text Available This editorial tackles a problem the Romanian forestry journals have never dealt with: the greenwashing phenomenon. After a brief excursion into the communication clichés consciously or unconsciously delivered by the media to the public, we have scrutinized the seven sins of greenwashing, found into the forestry sector or promoted by the public authority responsible for environmental protection. The first sin we have found refers to the hidden trade-offs and the best example in this respect is the stumpage price. Being too high, neither the forest administrator/owner nor the contractor pays attention to the quality of the harvesting process, compromising the natural regeneration, destroying the upper soil and triggering erosion processes. Lack of evidence about the misbehavior of forest inspectors or unsubstantiated allegation when it comes to the ones responsible with forest regime supervision is the second sin, followed by the sin of vagueness. The best example of vague statement is the concept of favorable conservation status, barely defined for species but hard to define for large habitats. The sin of worship false labels goes along with the forest management planning system still stuck to the sustained yield principle even for very small forest ownerships, unable to produce steady annual yields simply because a regular age structure cannot be ever reached. The sin of irrelevance was exemplified by the paper waste that follows each public awareness campaign based on colorful flyers, personalized plastic ballpoint pens, folders and so on. Compared to the environmental cost of having this paper recycled the social benefit of having used this paper-based material fades out. The sin of lesser of two evils pops up whenever the public authority fails to enforce the best available technology, which sometime comes about with a higher social cost or less fringe benefits for all people working in forestry. After the collapse of the communist regime

  16. ROTATION–ACTIVITY CORRELATIONS IN K AND M DWARFS. I. STELLAR PARAMETERS AND COMPILATIONS OF v sin i AND P /sin i FOR A LARGE SAMPLE OF LATE-K AND M DWARFS

    International Nuclear Information System (INIS)

    Houdebine, E. R.; Mullan, D. J.; Paletou, F.; Gebran, M.

    2016-01-01

    The reliable determination of rotation–activity correlations (RACs) depends on precise measurements of the following stellar parameters: T eff , parallax, radius, metallicity, and rotational speed v sin i . In this paper, our goal is to focus on the determination of these parameters for a sample of K and M dwarfs. In a future paper (Paper II), we will combine our rotational data with activity data in order to construct RACs. Here, we report on a determination of effective temperatures based on the ( R – I ) C color from the calibrations of Mann et al. and Kenyon and Hartmann for four samples of late-K, dM2, dM3, and dM4 stars. We also determine stellar parameters ( T eff , log( g ), and [M/H]) using the principal component analysis–based inversion technique for a sample of 105 late-K dwarfs. We compile all effective temperatures from the literature for this sample. We determine empirical radius–[M/H] correlations in our stellar samples. This allows us to propose new effective temperatures, stellar radii, and metallicities for a large sample of 612 late-K and M dwarfs. Our mean radii agree well with those of Boyajian et al. We analyze HARPS and SOPHIE spectra of 105 late-K dwarfs, and we have detected v sin i in 92 stars. In combination with our previous v sin i measurements in M and K dwarfs, we now derive P /sin i measures for a sample of 418 K and M dwarfs. We investigate the distributions of P /sin i , and we show that they are different from one spectral subtype to another at a 99.9% confidence level.

  17. Dirección del proyecto para la construcción del casco habitable del edificio multifamiliar Pramin, aplicando estándares del PMI

    OpenAIRE

    Cabrejos Canevaro, Omar; Garrido Lovón, Johan; Herrera Stoll, Alberto; Ramírez Apón, Ernesto

    2017-01-01

    La presente tesis tiene como objetivo principal el desarrollo de la Dirección de un proyecto para la construcción del Casco Habitable del Edificio Multifamiliar Pramin, ejecutado por la empresa Construcciones Corbus S.A., aplicando los estándares de la Guía del PMBOK, quinta edición, se busca lograr una ventaja competitiva sostenible en el tiempo a través de un modelo de dirección eficiente en sus procesos que sirva como base actualizable para la ejecución de cada proyecto de la empresa a fin...

  18. Días sin TV: la salud del hombre

    Directory of Open Access Journals (Sweden)

    Nelson González Leal

    2004-01-01

    Full Text Available Hoy hace una tarde tranquila. Por la ventana lateral del apartamento se cuela un zumbido espasmódico y ligero, lo producen los escasos automóviles que cruzan la avenida de cuando en cuando. El edificio que habito parece un Titán dormido, trasmite una molicie áspera y duradera, pero eso no quiebra la armonía del ambiente, por el contrario, le otorga sentido al clima, que es casi tibio. Son las cinco pasado el meridiano y los árboles juguetean con una brisa ligera y torpe, que de cuando en cuando choca con los cristales de las ventanas y se dispersa en fuga. Yo me acerco al balcón y observo las construcciones vecinas. Son moles grises, aunque su color sea blanco, verde o azul, parecen grises y dormitan igual que la antigua estructura desde donde fisgoneo. Vivo en una zona residencial de clase media, construida al interés de personas dispuestas a la caminata diurna y la larga y serena conversación vespertina. A doscientos metros de donde estoy hay una plaza, muchos árboles, una estación del Metro, varios locales comerciales y una gran avenida principal. Vivo en Altamira, baluarte de la reacción sociopolítica al gobierno del ex teniente coronel del ejército Hugo Chávez Frías.

  19. [Control levels of Sin3 histone deacetylase for spontaneous and UV-induced mutagenesis in yeasts Saccharomyces cerevisiae].

    Science.gov (United States)

    Lebovka, I Iu; Kozhina, T N; Fedorova, I V; Peshekhonov, V T; Evstiukhina, T A; Chernenkov, A Iu; Korolev, V G

    2014-01-01

    SIN3 gene product operates as a repressor for a huge amount of genes in Saccharomyces cerevisiae. Sin3 protein with a mass of about 175 kDa is a member of the RPD3 protein complex with an assessed mass of greater than 2 million Da. It was previously shownthat RPD3 gene mutations influence recombination and repair processes in S. cerevisiae yeasts. We studied the impacts of the sin3 mutation on UV-light sensitivity and UV-induced mutagenesis in budding yeast cells. The deletion ofthe SIN3 gene causes weak UV-sensitivity of mutant budding cells as compared to the wild-type strain. These results show that the sin3 mutation decreases both spontaneous and UV-induced levels of levels. This fact is hypothetically related to themalfunction of ribonucleotide reductase activity regulation, which leads to a decrease in the dNTP pool and the inaccurate error-prone damage bypass postreplication repair pathway, which in turn provokes a reduction in the incidence of mutations.

  20. Benthic foraminifera response to Holocene environmental changes in the ria de Muros (NW Spain)

    Science.gov (United States)

    Diz, P.; Francés, G.; Pena, L. D.; Nombela, M. A.; Alejo, I.

    2003-04-01

    Benthic foraminifera assemblages from the outer sector of the ría de Muros have been analyzed in order to obtain a detailed reconstruction of Holocene environmental evolution. The studied core (EUGC-3B: 42' 45.10'N; 9' 02.23'W, at 38 m.b.s.l. and 410 cm length) consists of muddy sand from the core bottom (8200 cal yr BP) to 200 cm (2700 cal yr BP) and mainly mud from 200 cm to the core top. Measurements of geochemical properties carried out by a XRF core scanner revealed different signatures in the two aforementioned intervals and an enhancing terrigenous influence during the last 2000 yr. The prevalence of Bulimina spp., Nonion fabum, Ammonia beccarii and Cibicides ungerianus along the whole core indicates high organic carbon concentration and/or low oxygenation levels into the sediment. Nevertheless, the percentage of these species shows noticeable changes, indicating the existence of five periods with different environmental conditions. The basal assemblage (8200-7500 cal yr BP) is dominated by epifaunal taxa and it can be interpreted as a low sea level assemblage. An increase of fresh water influence during the Holocene Climate Optimum (7500-5000 cal yr BP) is revealed by maxima percentages of A. beccarii. The oceanic influence increased during the Subboreal period (5000-2750 cal yr BP) leading to an active water interchange between the ría and the open ocean and a higher marine productivity. The oceanic influence is recorded by the increase of typical marine species as Elphidium advenum, Bulimina spp., N. fabum, and Nonionella turgida. The appearance of Rectuvigerina phlegeri at 4000 cal yr BP denotes full marine conditions. Environmental conditions similar to the current ones were achieved during the Subatlantic period (2750-Rec). In a first step an assemblage dominated by Bulimina spp. N. fabum, and C. ungerianus permit us to interpret a relatively stable period with episodic pulses of fluvial influence. Afterwards the appearance and the rapid increase of

  1. Piscina cubierta integrada en un conjunto de edificios Victorianos - Gran Bretaña

    Directory of Open Access Journals (Sweden)

    Idelberger, K.

    1980-02-01

    Full Text Available This modem building, housing an in-door swimming pool, blends-in beautifully with the adjacent mid-nineteen Century Victorian railway station. The building has two floors; the ground floor with a 12 X 7 m wading pool, a 25 X 12.5 m competition pool and dressing rooms, while the upper floor houses the lockers, management office, cafeteria, etc. and a terrace enjoying magnificent views. The steel structure was designed avoiding the sternness of modern functionalism in an attempt to make it compatible with architectural environment,

    Se presenta un edificio moderno, dedicado a piscina cubierta, muy bien encajada con la inmediata estación victoriana de mediados del siglo XIX. Consta de dos plantas: inferior con piscina de no nadadores, de 12 X 7 m, vestuarios y piscina de competición, de 25 X 12,50 m; la planta superior alberga las taquillas, dirección, administración, cafetería, etcétera con una terraza desde la que se disfrutan vistas magníficas. La estructura es metálica y se ha procurado quitarle monotonía, a fin de conjugar el modernismo y funcionalidad, con el entorno no paisajístico y arquitectónico.

  2. Dual Regulation of Bacillus subtilis kinB Gene Encoding a Sporulation Trigger by SinR through Transcription Repression and Positive Stringent Transcription Control.

    Science.gov (United States)

    Fujita, Yasutaro; Ogura, Mitsuo; Nii, Satomi; Hirooka, Kazutake

    2017-01-01

    It is known that transcription of kinB encoding a trigger for Bacillus subtilis sporulation is under repression by SinR, a master repressor of biofilm formation, and under positive stringent transcription control depending on the adenine species at the transcription initiation nucleotide (nt). Deletion and base substitution analyses of the kinB promoter (P kinB ) region using lacZ fusions indicated that either a 5-nt deletion (Δ5, nt -61/-57, +1 is the transcription initiation nt) or the substitution of G at nt -45 with A (G-45A) relieved kinB repression. Thus, we found a pair of SinR-binding consensus sequences (GTTCTYT; Y is T or C) in an inverted orientation (SinR-1) between nt -57/-42, which is most likely a SinR-binding site for kinB repression. This relief from SinR repression likely requires SinI, an antagonist of SinR. Surprisingly, we found that SinR is essential for positive stringent transcription control of P kinB . Electrophoretic mobility shift assay (EMSA) analysis indicated that SinR bound not only to SinR-1 but also to SinR-2 (nt -29/-8) consisting of another pair of SinR consensus sequences in a tandem repeat arrangement; the two sequences partially overlap the '-35' and '-10' regions of P kinB . Introduction of base substitutions (T-27C C-26T) in the upstream consensus sequence of SinR-2 affected positive stringent transcription control of P kinB , suggesting that SinR binding to SinR-2 likely causes this positive control. EMSA also implied that RNA polymerase and SinR are possibly bound together to SinR-2 to form a transcription initiation complex for kinB transcription. Thus, it was suggested in this work that derepression of kinB from SinR repression by SinI induced by Spo0A∼P and occurrence of SinR-dependent positive stringent transcription control of kinB might induce effective sporulation cooperatively, implying an intimate interplay by stringent response, sporulation, and biofilm formation.

  3. "... As we forgive those who trespass against us...": theological reflections on sin and guilt in the hospital environment.

    Science.gov (United States)

    Schmidt, Kurt W

    2005-08-01

    In general parlance the term sin has lost its existential meaning. Originally a Jewish-Christian term within a purely religious context, referring to a wrongdoing with regard to God, sin has slowly become reduced to guilt in the course of the secularization process. Guilt refers to a wrongdoing, especially with regard to fellow human beings. It also refers to errors of judgement with what can be tragic consequences. These errors can occur whenever human beings are called upon to act, including the hospital environment. A Christian hospital has to address the issue of how to deal not only with guilt-ridden misdemeanors, but also with wrongdoing unto God, which overshadows every instance of guilt-ridden human behavior. Here, as in every parish, the Church Service is the place to acknowledge sin, confess sin, and forgive sin, beyond the boundaries of the parish itself.

  4. Omission and other sins: Tracking the quality of online machine ...

    African Journals Online (AJOL)

    Omission and other sins: Tracking the quality of online machine translation output over four years. ... Journal Home > Vol 46 (2016) > ... We believe users should be made aware of the risks they unknowingly take when using online MT.

  5. Research on the Strategy of Motion Constraint-Aided ZUPT for the SINS Positioning System of a Shearer

    Directory of Open Access Journals (Sweden)

    Hai Yang

    2017-11-01

    Full Text Available The accurate measurement of position and orientation for shearers is a key technology in realizing an automated, fully-mechanized, coal mining face. Since Global Positioning System (GPS signal cannot arrive at the coal mine underground, wireless sensor network positioning system cannot operate stably in the coal mine; thus a strap-down inertial navigation system (SINS is used to measure the position and orientation of the shearer. Aiming at the problem of the SINS accumulative error, this paper proposes a positioning error correction method based on the motion constraint-aided SINS zero velocity updated (ZUPT model. First of all, a stationary state detection model of the shearer is built with median filter based on the acceleration and angular rate measured by the SINS. Secondly, the motion of the shearer is analyzed using coal mining technology, then the motion constraint model of the shearer is established. In addition, the alternate action between the motion constraint model and the ZUPT model is analyzed at the process of movement and cessation of the shearer, respectively; hence, the motion constraint-aided SINS ZUPT model is built. Finally, by means of the experimental platform of the SINS for the shearer, the experimental results show that the maximum position error with the positioning model proposed in this paper is 1.6 m in 180 s, and increases by 92.0% and 88.1% compared with the single motion constraint model and single ZUPT model, respectively. It can then restrain the accumulative error of the SINS effectively.

  6. Transformation of a metaphor: semantic shift in a Cantonese term 'Chi Sin' denoting insanity.

    Science.gov (United States)

    Ng, J Y W; Chen, E Y H

    2015-03-01

    The historical evolution of the existing terms used to describe insanity may be able to shed light on the formation of stigma towards psychosis patients. In Hong Kong, a widely used Cantonese term for insanity 'Chi Sin' provides a unique example because of its neutral original sense, as it literally means misconnection in a network circuit. We attempt to trace the origin and subsequent evolution of the term 'Chi Sin' from its early use to the present day to understand how local Hong Kong people have attached increasingly negative connotations to this scientific term since the mid-20th century. We sampled as many newspapers and magazines published in Hong Kong from 1939 to June 2014 as possible, and sampled 7 popular local movies from the 1950s and 1960s. We also searched all the newspapers published in Hong Kong, Macau, Taiwan, and Mainland China from January 1998 to June 2014, and searched several other local historical resources. In one early use of 'Chi Sin' in 1939, the term was only used in a technical sense to describe 'short circuiting'. We found that the development of the telephone system, the Strowger system, in Hong Kong is closely related to the evolution of the semantics of the term 'Chi Sin'. The original meaning of short circuitry of the term 'Chi Sin' is no longer used, and it has become a dead metaphor through repeated use with negative emotional connotations. This illustrates some of the factors facilitating the emergence of a metaphor with subsequent semantic drift.

  7. Vivienda unifamiliar en Aravaca Madrid – España

    Directory of Open Access Journals (Sweden)

    Martín-Artajo, Alberto

    1976-06-01

    ño y aseo. En la última planta se dispuso: un zaguán para trofeos con despacho incorporado; una sala de juegos; un estudio, y un solarlo totalmente acristalado. El edificio, de estructura puntual y con muros pantalla en el sótano, está revestido exteriormente con piezas cerámicas en su totalidad. Los cuerpos de chimeneas, los pronunciados y gruesos aleros, así como los muros en pendiente, componen un conjunto armonioso de fuerte personalidad.

  8. Rotation-Activity Correlations in K and M Dwarfs. I. Stellar Parameters and Compilations of v sin I and P/sin I for a Large Sample of Late-K and M Dwarfs

    Science.gov (United States)

    Houdebine, E. R.; Mullan, D. J.; Paletou, F.; Gebran, M.

    2016-05-01

    The reliable determination of rotation-activity correlations (RACs) depends on precise measurements of the following stellar parameters: T eff, parallax, radius, metallicity, and rotational speed v sin I. In this paper, our goal is to focus on the determination of these parameters for a sample of K and M dwarfs. In a future paper (Paper II), we will combine our rotational data with activity data in order to construct RACs. Here, we report on a determination of effective temperatures based on the (R-I) C color from the calibrations of Mann et al. and Kenyon & Hartmann for four samples of late-K, dM2, dM3, and dM4 stars. We also determine stellar parameters (T eff, log(g), and [M/H]) using the principal component analysis-based inversion technique for a sample of 105 late-K dwarfs. We compile all effective temperatures from the literature for this sample. We determine empirical radius-[M/H] correlations in our stellar samples. This allows us to propose new effective temperatures, stellar radii, and metallicities for a large sample of 612 late-K and M dwarfs. Our mean radii agree well with those of Boyajian et al. We analyze HARPS and SOPHIE spectra of 105 late-K dwarfs, and we have detected v sin I in 92 stars. In combination with our previous v sin I measurements in M and K dwarfs, we now derive P/sin I measures for a sample of 418 K and M dwarfs. We investigate the distributions of P/sin I, and we show that they are different from one spectral subtype to another at a 99.9% confidence level. Based on observations available at Observatoire de Haute Provence and the European Southern Observatory databases and on Hipparcos parallax measurements.

  9. ROTATION–ACTIVITY CORRELATIONS IN K AND M DWARFS. I. STELLAR PARAMETERS AND COMPILATIONS OF v sin i AND P /sin i FOR A LARGE SAMPLE OF LATE-K AND M DWARFS

    Energy Technology Data Exchange (ETDEWEB)

    Houdebine, E. R. [Armagh Observatory, College Hill, BT61 9DG Armagh, Northern Ireland (United Kingdom); Mullan, D. J. [Department of Physics and Astronomy, University of Delaware, Newark, DE 19716 (United States); Paletou, F. [Université de Toulouse, UPS-Observatoire Midi-Pyrénées, IRAP, Toulouse (France); Gebran, M., E-mail: eric_houdebine@yahoo.fr [Department of Physics and Astronomy, Notre Dame University-Louaize, P.O. Box 72, Zouk Mikael (Lebanon)

    2016-05-10

    The reliable determination of rotation–activity correlations (RACs) depends on precise measurements of the following stellar parameters: T {sub eff}, parallax, radius, metallicity, and rotational speed v sin i . In this paper, our goal is to focus on the determination of these parameters for a sample of K and M dwarfs. In a future paper (Paper II), we will combine our rotational data with activity data in order to construct RACs. Here, we report on a determination of effective temperatures based on the ( R – I ){sub C} color from the calibrations of Mann et al. and Kenyon and Hartmann for four samples of late-K, dM2, dM3, and dM4 stars. We also determine stellar parameters ( T {sub eff}, log( g ), and [M/H]) using the principal component analysis–based inversion technique for a sample of 105 late-K dwarfs. We compile all effective temperatures from the literature for this sample. We determine empirical radius–[M/H] correlations in our stellar samples. This allows us to propose new effective temperatures, stellar radii, and metallicities for a large sample of 612 late-K and M dwarfs. Our mean radii agree well with those of Boyajian et al. We analyze HARPS and SOPHIE spectra of 105 late-K dwarfs, and we have detected v sin i in 92 stars. In combination with our previous v sin i measurements in M and K dwarfs, we now derive P /sin i measures for a sample of 418 K and M dwarfs. We investigate the distributions of P /sin i , and we show that they are different from one spectral subtype to another at a 99.9% confidence level.

  10. Valoración de riesgos inducidos por la construcción de nuevos edificios en el campus de la Universidad de Deusto. España

    OpenAIRE

    Saiz de Omeñaca, Jesús; Edeño, Iñaki; Saiz de Omeñaca, José Antonio

    1990-01-01

    El estudio de la morfología de una cuenca adyacente a los terrenos donde se proyectaba construir un gran edificio, reveló que éste y otras construcciones podrían resultar seriamente dañadas a causa de avenidas violentas. Para valorar tal riesgo, se calculó la cantidad de agua que en caso de precipitaciones extraordinarias caería en la cuenca, la permeabilidad de la misma, las posibilidades de retención por la vegetación, los suelos y los recubrimientos geológicos y diversos factores capaces d...

  11. #TrumpenMéxico. Acción conectiva transnacional en Twitter y la disputa por el muro fronterizo

    Directory of Open Access Journals (Sweden)

    2018-04-01

    Full Text Available El presente artículo busca identificar cómo se articuló la opinión pública digital en la red social Twitter durante la visita del entonces candidato republicano Donald Trump a la Ciudad de México en el año 2016 por invitación del gobierno mexicano que fue precedida de la amenaza de construir un muro fronterizo que pagaría México. Mediante una metodología mixta compuesta por métodos computacionales tales como minería de datos y análisis de redes sociales combinado con análisis de contenido se identifican los patrones de la conversación y las estructuras de redes que se conformaron a partir de este acontecimiento de la política exterior de ambas naciones que comparten una extensa frontera. Se estudiaron las prácticas mediáticas digitales y los encuadres emocionales con los cuales los usuarios de esta red social se involucraron en la controversial visita marcada por una compleja relación política, cultural e histórica. El análisis de 352.203 tuits en dos idiomas (inglés y español, los más utilizados en las conversaciones, permitió comprender cómo se articula la opinión pública transnacional en acciones conectivas detonadas por eventos noticiosos en contextos culturales distintos, así como los encuadres emocionales que permearon la conversación, cuyas diferencias palpables demuestran que cuando se habla de Twitter no se trata de un universo homogéneo, sino de un conjunto de universos codeterminados por el contexto sociocultural.

  12. Cambios microestructurales y reológicos de masas y panes sin gluten

    OpenAIRE

    Rivera Flores, José Octavio

    2015-01-01

    El estudio de la microestructura de las masas y panes sin gluten nos permite predecir el comportamiento de estos durante los procesos de elaboración y por ende la maquinabilidad de los mismos. Se hizo un análisis reológico de masas sin gluten y un análisis de perfil de textura (TPA) a los panes elaborados a partir de estas, también se tomaron imágenes por medio del microscopio electrónico de barrido, tanto de las masas como de los panes. Para hacer el perfil reológico se hicieron ensayos osci...

  13. Extracción Automática de Edificios a partir de Modelos Digitales de Superficies : el sistema BUILDING

    Directory of Open Access Journals (Sweden)

    José Luis Pérez García

    2008-01-01

    Full Text Available En este trabajo se plantea una aproximación al complicado problema de la localización, extracción y representación vectorial de manera semiautomática de edificaciones situadas en zonas urbanas o suburbanas, a partir del análisis de modelos de superficie, lo suficientemente densos como para representar la escena urbana, y de imágenes aéreas orientadas de la zona de estudio. Elmétodo propuesto utiliza como información de partida losmodelos digitales de superficie generados de forma automáticamediante técnicas fotogramétricas o de sistemas LIDAR con una densidad demalla elevada, así como de un modelo previo de forma geométrica de los edificios existentes en la zona. Estos modelos de superficie, serán tratados mediante operaciones de morfología matemática para la diferenciar los puntos que pertenecen al terreno propiamente dicho, de los pertenecientes a objetos situados sobre él, así como por momentos geométricos invariantes para obtener el rectángulo representativo del objeto localizado. Una vez localizados los posibles edificios, así como los rectángulos que representan a cada uno de ellos, se procederá a refinar estos resultados trabajando sobre los fotogramas aéreos correspondientes. Mediante análisis digital de imágenes se realizará una extracción de bordes y con la ayuda de la transformada de Hough se obtendrá el rectángulo principal de la imagen. Este rectángulo junto con la altura delmismo extraída en la fase anterior, formará el prisma de base rectangular que representará al edificio. Todas estas operaciones han sido implementadas en un sistema de desarrollo propio, el sistema BUILDING, cuyos resultados iniciales son presentados en este trabajo para poner de manifiesto las posibilidades y problemas de la metodología propuesta.In this work we present an approximation to the complicated problem of the semiautomatic location, extraction and vector representation of buildings. This approximation is based on

  14. Stress engineering in GaN structures grown on Si(111) substrates by SiN masking layer application

    Energy Technology Data Exchange (ETDEWEB)

    Szymański, Tomasz, E-mail: tomasz.szymanski@pwr.edu.pl; Wośko, Mateusz; Paszkiewicz, Bogdan; Paszkiewicz, Regina [The Faculty of Microsystem Electronics and Photonics, Wrocaw University of Technology, Janiszewskiego 11/17, 50-372 Wroclaw (Poland); Drzik, Milan [International Laser Center, Ilkovicova 3, 841-04 Bratislava 4 (Slovakia)

    2015-07-15

    GaN layers without and with an in-situ SiN mask were grown by using metal organic vapor phase epitaxy for three different approaches used in GaN on silicon(111) growth, and the physical and optical properties of the GaN layers were studied. For each approach applied, GaN layers of 1.4 μm total thickness were grown, using silan SiH{sub 4} as Si source in order to grow Si{sub x}N{sub x} masking layer. The optical micrographs, scanning electron microscope images, and atomic force microscope images of the grown samples revealed cracks for samples without SiN mask, and micropits, which were characteristic for the samples grown with SiN mask. In situ reflectance signal traces were studied showing a decrease of layer coalescence time and higher degree of 3D growth mode for samples with SiN masking layer. Stress measurements were conducted by two methods—by recording micro-Raman spectra and ex-situ curvature radius measurement—additionally PLs spectra were obtained revealing blueshift of PL peak positions with increasing stress. The authors have shown that a SiN mask significantly improves physical and optical properties of GaN multilayer systems reducing stress in comparison to samples grown applying the same approaches but without SiN masking layer.

  15. Composition, structure and properties of SiN x films fabricated by pulsed reactive closed-field unbalanced magnetron sputtering

    International Nuclear Information System (INIS)

    Yao, Zh.Q.; Yang, P.; Huang, N.; Sun, H.; Wan, G.J.; Leng, Y.X.; Chen, J.Y.

    2005-01-01

    Silicon nitride (SiN x ) thin films are of special interest in both scientific research and industrial applications due to their remarkable properties such as high thermal stability, chemical inertness, high hardness and good dielectric properties. In this work, SiN x films were fabricated by pulsed reactive closed-field unbalanced magnetron sputtering of high purity single crystal silicon targets in an Ar-N 2 mixture. The effect of N 2 partial pressure on the film composition, chemical bonding configurations, surface morphology, surface free energy, optical and mechanical properties were investigated. We showed that with increased N 2 partial pressure, the N to Si ratio (N/Si) in the film increased and N atoms are preferentially incorporated in the NSi 3 stoichiometric configuration. It leads the Si-N network a tendency to chemical order. Films deposited at a high N 2 fraction were consistently N-rich. The film surface transformed from a loose granular structure with microporosity to a homogeneous, continuous, smooth and dense structure. A progressive densification of the film microstructure occurs as the N 2 fraction is increased. The reduced surface roughness and the increased N incorporation in the film give rise to the increased contact angle with double-distilled water from 24 o to 49.6 o . To some extent, the SiN x films deposited by pulsed magnetron sputtering are hydrophilic in nature. The as-deposited SiN x films exhibit good optical transparency in the visible region and the optical band gap E opt can be varied from 1.68 eV for a-Si to 3.62 eV for SiN x films, depending on the synthesis parameters. With the increase of the N/Si atomic ratio, wear resistance of the SiN x films was improved, a consequence of increased hardness and elastic modulus. The SiN x films have lower friction coefficient and better wear resistance than 316L stainless steel under dry sliding friction, where the SiN x films experienced only fatigue wear

  16. Measurement of the cp violation parameter sin 2 beta

    International Nuclear Information System (INIS)

    K.F. Kelley

    1999-01-01

    This thesis presents a measurement of the time-dependent asymmetry in the rate of (anti B) d 0 versus B d 0 decays to J/ψK s 0 . In the context of the Standard Model this is interpreted as a measurement of the CP violation parameter sin(2β). A total of 198±17 B d 0 /(anti B) d 0 decays were observed in p(anti p) collisions at √s=1.8 TeV by the CDF detector at the Fermilab Tevatron. The initial B flavor (whether B 0 or (anti B) 0 ) is determined by a same-side flavor tagging technique. The analysis results in sin(2β)=1.8±1.1(stat.)±0.3(syst.). This analysis demonstrates the feasibility of studying CP violation in the B 0 -(anti B) 0 system at a hadron collider. By applying the methods used in this analysis, future, higher-statistics experiments should be able to tightly constrain the parameters of the Standard Model

  17. Transmisión de cargas entre forjados y puntales en un edificio de forjado reticular de casetón perdido utilizando clareado

    Directory of Open Access Journals (Sweden)

    Gasch, I.

    2013-06-01

    Full Text Available This paper presents the results of tests carried out during the construction of a building of flats with cast-in-place girderless hollow floor slab in Sabadell, Spain, using the shoring, clearing and striking (SCS process. Loads on shores were recorded during the different construction stages of floor slabs 1 to 6. The two first floor slabs had geometry different than the rest. The experimental results were used to analyse load transmission between slabs and shores during the construction of the building with a SCS process. The experimental results were compared with those obtained applying simplified methods that consider the real stiffness of the shoring, obtaining that the method with a better fit was the New Simplified Procedure.En el presente artículo se presentan los resultados de la instrumentación llevada a cabo durante la construcción de un edificio de viviendas resuelto con forjados reticulares de casetón perdido situado en Sabadell (España, en el que se ha empleado un proceso de cimbrado, clareado, descimbrado (CCD. Se han registrado las cargas debidas a las operaciones constructivas de CCD en puntales de los seis primeros forjados. Dichos registros han permitido analizar la transmisión de cargas entre forjados y puntales durante la construcción de este edificio, teniendo un proceso de CCD. El análisis de las medidas experimentales ha permitido concluir que la transmisión de cargas entre forjados y puntales difiere según las condiciones de contorno del vano estudiado. Asimismo, se han comparado las medidas experimentales con diversos métodos simplificados que permiten simular la operación del clareado, obteniendo que el método que mejor se ajusta es el Nuevo Procedimiento Simplificado.

  18. Actuaciones para mejorar la seguridad y calidad de los edificios

    Directory of Open Access Journals (Sweden)

    García Meseguer, Álvaro

    1980-02-01

    Full Text Available After discussing the most recent statistic on construction failures and proving that such failures occur in inverse proportion to the level of supervision applied during the various stages of the construction process, the article enters into the subjects of production control and receiving control, analyzing the evolution of both concepts in recent times. The design, materials selection, construction and maintenance stages are individually studied with indication of the weak points currently recognized in each stage. The article ends with the presentation of the modern quality assurance concept and describing the changes that can be expected in the future as the result of the new ideas in the way buildings are conceived and designed.

    Tras aludir al origen de los fallos en construcción según estadísticas recientes y demostrar que los fallos están relacionados en proporción inversa con el grado de control ejercido en las distintas fases del proceso constructivo, el artículo se extiende sobre los conceptos de control de producción y control de recepción analizando la evolución experimentada por tales conceptos en los últimos años. Se estudian después por separado las fases de planeamiento, diseño, proyecto, materiales, construcción y conservación indicándose los puntos débiles que en cada una de ellas existen hoy día. El artículo termina presentando el concepto moderno de garantía de calidad y aludiendo a los cambios que son esperables en el futuro, como consecuencia de las nuevas ideas, en la forma de concebir y proyectar los edificios.

  19. Determinación de variables cualitativas como factores claves en la programación de los proyectos de edificios en altura, región Coquimbo, Chile.

    OpenAIRE

    Oscar Contreras; Ronnie Kauer

    2015-01-01

    En el presente trabajo se realiza un análisis y se determina en términos cualitativos los factores claves que inciden en la adecuada programación de las duraciones de las actividades en los proyectos de construcción de edificios en altura en la ciudad de Coquimbo, Chile. El análisis profundiza el estudio y desarrollo del modelo estocástico pert/cpm modificado aplicado con antelación, del cual nace la búsqueda de explicaciones de las desviaciones obtenidas, encontrándose, variables del tipo cu...

  20. Hospital en Neuwitteisbach, Alemania Federal

    Directory of Open Access Journals (Sweden)

    Haindl, Friedrich F.

    1975-04-01

    Full Text Available It consists of: the actual hospital, one house for the staff, one service yard and underground garage. The hospital comprises four storeys and two basements, whilst the other building only has three floors. On the ground floor of the hospital are we located: the entrance; the nucleus of vertical communication; work rooms for the doctors and nurses; the administration section; X-ray and cobalt installations; and a small chapel. The three remaining upper floors contain 160 beds distributed over 6 wards and in single, double or triple rooms. Each floor is equipped with a service section. The first basement includes the ambulance entrance, the medical wards of the hospital, the staff dining-room, a kitchen and the heating installation. The second basement is reserved for kitchen storage rooms and the remaining installations of the building. Structure of reinforced concrete and outer walls of brick covered with panels of washed concrete.Está formado por: el hospital propiamente dicho, un edificio destinado a viviendas para el personal, patio de servicio y garaje subterráneo. El hospital consta de cuatro plantas y dos sótanos, mientras que el otro edificio sólo tiene tres plantas. En la planta baja del hospital se encuentran: la entrada; el núcleo de comunicación vertical; las salas de trabajo de médicos y enfermeras; la zona de administración; las instalaciones de rayos X y bomba de cobalto; y una pequeña capilla. En las tres plantas superiores se distribuyen 160 camas repartidas en seis unidades de hospitalización, con habitaciones de 1, 2 ó 3 camas. Cada planta cuenta, además, con una zona de servicio. En el primer sótano se hallan, además de la entrada de ambulancias, los servicios médicos del hospital, los comedores del personal, una cocina, y la instalación de calefacción. El segundo sótano se dedica, en su totalidad, a almacenes de la cocina y del resto de las instalaciones del edificio. Estructura de

  1. Análisis tipológico de las estructuras de las construcciones rurales tradicionales de barro. La casa de corral en el Páramo de León (España

    Directory of Open Access Journals (Sweden)

    Rego Sanmartín, Teresa

    2000-08-01

    Full Text Available Traditional rural buildings reflect the building techniques inherited from ancestors, where materials mastery is proved. In this job we analyse the structure of one of the most relevant Spanish traditional agrarian building: the "casa de corral"(yard house. Thirty seven "corrales" (yards of the vernacular earthen construction in the "Páramo de León"(León, Spain were analysed. It was necessary think up an analysis method, which we called "round analysis method". Generally. radial cross sections of the yard have a main space between two earth walls bearing over stone foundation, which support floor framing, the roof framing, roof sheathing and arabic curved tiles. A gantry is usually built inward the yard, on a stone baseLas construcciones rurales tradicionales suelen reflejar el buen hacer de quienes han heredado las técnicas de sus antepasados, demostrando un dominio admirable de los materiales. En este trabajo nos centramos en el análisis estructural de uno de los edificios más emblemáticos de las construcciones agrarias tradicionales peninsulares: la casa de corral. Se analizaron 37 de estos edificios, uniformemente repartidos por la comarca del Páramo de León (España. pertenecientes a la denominada construcción de barro rural tradicional contemporánea. Para llevar a cabo el estudio fue necesario idear el denominado método giratorio de análisis. en virtud del cual se realizan sucesivos cortes radiales al corral. Esto nos permitió establecer las características constructivas más relevantes de dichos edificios. En general. las secciones radiales del corral suelen contar con un volumen principal de gruesos muros de carga a base de tapial sobre cimiento de piedra. sustentando los forjados y la estructura de cubierta, cuya impermeabilidad se logra mediante teja árabe. dispuesta sobre enlabiado de madera o sobre rama entretejida. Hacia el interior del corral se suele construir el corredor porticado, cuyos soportes transmiten las

  2. Maison de verre / Zonestraal. Relato de dos edificios

    Directory of Open Access Journals (Sweden)

    Jan Molema

    2014-01-01

    Full Text Available Desde los años sesenta del siglo XX el sanatorio Zonnestraal de Hilversum y la Maison de Verre en París han sido descritos extensamente en la literatura de la arquitectura moderna. Sin embargo, no se ha hecho ningún esfuerzo por colocarlos juntos en un mismo relato. Este ensayo es un esfuerzo para enmendar ese vacío. Ambos están relacionados íntimamente por sus autores: Bernard Bijvoet, como codiseñador de los planos de la Maison, y Johannes Duiker, quien trabajó con el anterior en los preliminares de Zonnestraal, aunque lo finalizó en solitario, al mismo tiempo que se terminó el diseño de la casa. En el trabajo se cuestiona además, ofreciendo fundadas conjeturas, la creencia establecida de que se precisó una nueva estructura metálica para sustentar la inalterada vivienda situada encima de la Maison de Verre.

  3. Crustáceos decápodos de la cuenca del Río Sinú, Córdoba, Colombia

    Directory of Open Access Journals (Sweden)

    Jorge Alexander Quirós Rodríguez

    2016-09-01

    Full Text Available Para evaluar la composición, abundancia y distribución de los crustáceos decápodos en la cuenca del río Sinú, departamento de Córdoba (Colombia, se estudiaron ocho localidades: cuatro en el río Sinú y cuatro en el complejo cenagoso del bajo Sinú. Para ello, se realizaron seis muestreos entre abril de 2005 y mayo de 2006. En total se registraron 458 crustáceos decápodos distribuidos en tres familias, seis géneros y ocho especies. La familia mejor representada fue Trichodactylidae con cuatro géneros y cuatro especies, seguida de Palaemonidae con un género y tres especies, mientras que de la familia Atyidae solo registró una especie. Especies como Macrobrachium carcinus y M. acanthurus, presentaron el rango más amplio de distribución, siendo características tanto para el rio Sinú como para el CCBS. Entre las especies identificadas, Atya crassa en el río Sinú y Trichodactylus quinquedentatus en el CCBS son nuevos registros para el departamento de Córdoba.

  4. El uso de humidificadores como alternativa energética al aire acondicionado: caso de un edificio docente en Santiago de Compostela

    Directory of Open Access Journals (Sweden)

    Fernando Blanco Silva

    2012-01-01

    Full Text Available El presente artículo es una propuesta para reducir la temperatura en un espacio denominado Claustro en el edificio Escuela Técnica Superior de Ingeniería, de la Universidad de Santiago (U.S.C.. Este espacio dispone de un lucernarioabierto con alta radiación solar y que en verano llega a alcanzar los 37ºC. El espacio tiene un volumen de unos 7.000 m3 y una instalación convencional de aire acondicionado es demasiado cara. Nuestra propuesta para reducir la temperatura es aumentar la humedad en el ambiente y una renovación simultánea del aire, con un coste más reducido y menos energía consumida.

  5. SINs and SOMs: Neural microcircuits for size tuning in the zebrafish and mouse visual pathway.

    Directory of Open Access Journals (Sweden)

    Alison J. Barker

    2013-05-01

    Full Text Available In many animals, a fast and reliable circuit for discriminating between predator-sized objects and edible (prey-sized objects is necessary for survival. How are receptive fields in visual brain areas organized to extract information about size? Recent studies from the zebrafish optic tectum and the mouse visual cortex suggest de novo shaping of receptive fields by subtypes of inhibitory neurons. Del Bene et al. (2010 describe a population of GABAergic neurons in the zebrafish optic tectum (Superficial Interneurons, SINs that are necessary for size filtering during prey capture. Adesnik et al. (2012 describe a somatostatin-expressing interneuron population (SOMs that confers surround suppression on layer II/III pyramidal cells in mouse V1. Strikingly both the SINs and the SOMs, display size-dependent response properties. Increasing visual stimulus size increases excitatory input to these neurons. Dampening SIN or SOM activity alters tuning of neighboring circuits such that they lose preference for small objects. Both results provide exciting evidence for mechanisms of size filtering in visual circuits. Here we review the roles of the SINs and the SOMs and speculate on the similarity of such spatial filters across species.

  6. REDUCCIÓN DE VIBRACIONES EN UN EDIFICIO MEDIANTE LA UTILIZACIÓN DE AMORTIGUADORES MAGNETOREOLÓGICOS

    Directory of Open Access Journals (Sweden)

    LUIS A. LARA V.

    2012-01-01

    Full Text Available Uno de los dispositivos de control semi-activo más prometedor es el amortiguador magnetoreológico (MR, el cual se compone de un cilindro hidráulico, bobinas magnéticas y un fluido estimulable, denominado fluido magnetoreológico, cuya principal particularidad es su habilidad para variar, de manera reversible, de un estado liquido lineal viscoso de libre flujo para un estado semi-sólido en apenas milisegundos, cuando es expuesto a un campo magnético. Esta peculiaridad hace de los amortiguadores MR una herramienta ideal para el control de sistemas estructurales, pues con ellos es posible administrar fuerzas de amortiguamiento de forma simple, rápida y segura a un costo relativamente bajo. En el presente trabajo se analiza la respuesta estructural de un edificio tipo pórtico de dos pisos controlado por un par de amortiguadores MR administrados por un regulador lineal cuadrático (LQR asociado a un algoritmo de selección de señal de comando desarrollado en el controlador clipped optimal. Los resultados obtenidos mostraron reducciones superiores al 49% y 76%, respectivamente, de picos de respuesta y de valores RMS de respuesta.

  7. A Novel Scheme for DVL-Aided SINS In-Motion Alignment Using UKF Techniques

    Directory of Open Access Journals (Sweden)

    Wenqi Wu

    2013-01-01

    Full Text Available In-motion alignment of Strapdown Inertial Navigation Systems (SINS without any geodetic-frame observations is one of the toughest challenges for Autonomous Underwater Vehicles (AUV. This paper presents a novel scheme for Doppler Velocity Log (DVL aided SINS alignment using Unscented Kalman Filter (UKF which allows large initial misalignments. With the proposed mechanism, a nonlinear SINS error model is presented and the measurement model is derived under the assumption that large misalignments may exist. Since a priori knowledge of the measurement noise covariance is of great importance to robustness of the UKF, the covariance-matching methods widely used in the Adaptive KF (AKF are extended for use in Adaptive UKF (AUKF. Experimental results show that the proposed DVL-aided alignment model is effective with any initial heading errors. The performances of the adaptive filtering methods are evaluated with regards to their parameter estimation stability. Furthermore, it is clearly shown that the measurement noise covariance can be estimated reliably by the adaptive UKF methods and hence improve the performance of the alignment.

  8. Hamilton Place - Ontario Canadá

    Directory of Open Access Journals (Sweden)

    Garwood-Jones, T. P.

    1975-04-01

    distintos capaces de recoger, por un lado, los matices de la palabra en las representaciones teatrales, y por otro, la claridad y brillantez de las orquestas y coros. Entre los elementos destacan: el muro móvil que, cerrando la embocadura del proscenio, incorpora la orquesta a la sala; las dos plataformas elevables, en donde se sitúa la orquesta; los paños de terciopelo, colgados a modo de estandartes, que amortiguan la reverberación del ruido; y los doseles móviles de la zona de la orquesta, que dirigen y orientan el sonido. Las técnicas constructivas más interesantes son: la subdivisión del edificio en distintas partes, cada una de ellas con cimentación independiente para evitar la transmisión del sonido de unas zonas a otras; la textura de los muros de ladrillo que disgregan el sonido reflejado; y el empleo de contrafuertes para crear pequeñas zonas íntimas de uso variado. Las características acústicas quedan mejoradas mediante una instalación de sonido, formada por pequeños altavoces colocados debajo de cada asiento y por otros más grandes distribuidos en los muros que limitan la sala. El edificio se completa con los locales de servicio, propios de una construcción de este tipo, y un pequeño teatro-estudio para los ensayos de la orquesta y de los actores, mientras en la sala principal se realizan otras representaciones.

  9. The black Arab as a substitution for sin and guilt

    Directory of Open Access Journals (Sweden)

    Petrović Radmilo

    2009-01-01

    Full Text Available The figure of the Black Arab as a form of guilt and sin is a well-established memorial pattern throughout the Mediterranean world, having already existed for more than 3000 years. This text is focused on two different types of interpretation of the Black Stone and its semantic relation with the symbolized figure of Black Arab in the oral traditions of Mediterranean peoples - Jewish religion and Islamic eschatology. The transformation of the signification of the Black Stone was transferred to the Islamic religion in the act of pilgrimage. The Jewish practice of transferring sin and guilt is related with the Iranian-Manichean Ahura Mazda-Ahriman, and the ancient Greek goddess Hecate. All manifestations of the Black Arab left a deep trace on Slavic spiritual life through the Slavic gods Chernobog, Triglav and Toyan and consequently on the deeply rooted conception of all Slavic peoples that the Black Arab was a black demon of death and the underworld.

  10. DIVERSIDAD DE ABEJAS SIN AGUIJÓN (HYMENOPTERA:MELIPONINI UTILIZADAS EN MELIPONICULTURA EN COLOMBIA

    Directory of Open Access Journals (Sweden)

    Guiomar Nates Parra

    2013-09-01

    Full Text Available En Colombia se conoce la existencia de cerca de 120 especies de abejas nativas sin aguijón, muchas de las cuales tienen importantes usos y representaciones para diversos grupos sociales y culturales. A pesar de que su cría y manejo (meliponicultura, es una actividad que viene creciendo y tecnificándose en Latinoamérica y otras regiones del mundo, sus características y desarrollo en Colombia han sido poco documentados. Se presentan los resultados de entrevistas y visitas a 75 personas en 16 departamentos de Colombia, que cultivan 25 especies de abejas sin aguijón, agrupadas en 12 géneros. Se encontraron al menos nueve especies más sin identificación completa, se reportan cuatro nuevos registros para el país y se amplía la distribución para 21 taxones. Se presenta información sobre la distribución regional y altitudinal, el cultivo urbano y las denominaciones locales para las abejas. Se revisan algunas características de los géneros cultivados más comunes (Tetragonisca, Melipona, Paratrigona, Scaptotrigona, y Nannotrigona y se discute la importancia del vínculo entre diversidad biológica y cultural que se manifiesta en los nombres locales reportados. Ante un escenario mundial de expansión de la meliponicultura, se resaltan necesidades de investigación y riesgos para la conservación y manejo de la diversidad de abejas sin aguijón y los conocimientos asociados.

  11. Edificio en la Universidad de Liverpool

    Directory of Open Access Journals (Sweden)

    Bryan & Norman Westwood & Partners, Arquitectos

    1964-09-01

    conferencias; las últimas plantas están divididas en habitaciones pequeñas. El ático lo ocupa el decano. El ala destinada a Oceanografía, de una sola planta, con laboratorios, conecta la. parte frontal y posterior del conjunto. El bloque con fachada a Bedford Street, que tiene dos plantas, está dedicada al cálculo numérico y estático, excepto una serie de dependencias anexas y en conexión con el ala de Oceanografía. La comunicación entre las diversas alas se realiza al nivel de la planta baja. Los edificios que integran este complejo universitario constituyen un conjunto orgánico, que destaca por su buen funcionamiento y adecuada ambientación, tanto interior como exterior.

  12. El Instituto de Secundaria Enseñanza de Cáceres. El edificio y sus mejoras (1900-1936. The Secondary School of Cáceres. The building and improvements (1990-1936.

    Directory of Open Access Journals (Sweden)

    Cristina Redondo Castro

    2016-06-01

    Full Text Available (ES Los centros escolares forman parte del patrimonio histórico-educativo, además de constituir un testimonio muy importante de la historia de la educación y de la historia social y cultural. Los primeros institutos, reconocidos como Institutos Históricos, son testigos privilegiados. En el caso de Cáceres, el legado más importante es el edificio que albergó al Instituto de Segunda Enseñan-za. En este trabajo se enumeran y documentan las mejoras que en él se llevaron a cabo tanto para adaptarse a los nuevos planes de estudios y corrientes pedagógicas, como para la conservación del edificio, en las fechas comprendidas entre 1900 y 1936. (EN Schools are part of the historical and educational heritage, besides being a very important testi-mony of the history of education and of the social and cultural history. The first secondary schools, recognized as historical ones, are privileged witnesses. In the case of Cáceres, the most important legacy is the building that housed the Secondary School. This article lists and gives evidences of the improvements that were carried out both to adapt to new curricula and pedagog-ical trends and to the maintenance of the building between 1900 and 1936.

  13. Theoretical study of isoelectronic SinM clusters (M=Sc-,Ti,V+; n=14-18)

    DEFF Research Database (Denmark)

    Torres, M. B.; Fernandez Sanchez, Eva; Balbás, L. C.

    2007-01-01

    We study, from first-principles quantum mechanical calculations, the structural and electronic properties of several low-lying energy equilibrium structures of isoelectronic SinM clusters (M=Sc-,Ti,V+) for n=14-18. The main result is that those clusters with n=16 are more stable than its neighbors...... of the spherical potential model). The structures of the two lowest energy isomers of Si16M are nearly degenerate, and consist of the Frank-Kasper polyhedron and a distortion of that polyhedron. The first structure is the ground state for M=V+, and the second is the ground state for Ti and Sc-. For the lowest...... energy isomers of clusters SinM with n=14-18, we analyze the changes with size n, and impurity M of several quantities: binding energy, second difference of total energy, HOMO-LUMO gap, adiabatic electron affinity, addition energy of a Si atom, and addition energy of an M impurity to a pure Si-n cluster...

  14. Back scattering involving embedded silicon nitride (SiN) nanoparticles for c-Si solar cells

    Science.gov (United States)

    Ghosh, Hemanta; Mitra, Suchismita; Siddiqui, M. S.; Saxena, A. K.; Chaudhuri, Partha; Saha, Hiranmay; Banerjee, Chandan

    2018-04-01

    A novel material, structure and method of synthesis for dielectric light trapping have been presented in this paper. First, the light scattering behaviour of silicon nitride nanoparticles have been theoretically studied in order to find the optimized size for dielectric back scattering by FDTD simulations from Lumerical Inc. The optical results have been used in electrical analysis and thereby, estimate the effect of nanoparticles on efficiency of the solar cells depending on substrate thickness. Experimentally, silicon nitride (SiN) nanoparticles have been formed using hydrogen plasma treatment on SiN layer deposited by Plasma Enhanced Chemical Vapour Deposition (PECVD). The size and area coverage of the nanoparticles were controlled by varying the working pressure, power density and treatment duration. The nanoparticles were integrated with partial rear contact c-Si solar cells as dielectric back reflector structures for the light trapping in thin silicon solar cells. Experimental results revealed the increases of current density by 2.7% in presence of SiN nanoparticles.

  15. EVALUACIÓN DE LA CALIDAD DE CARAMELOS DE UCHUVA SIN SACAROSA ADICIONADOS CON CALCIO

    Directory of Open Access Journals (Sweden)

    FRANCIA ELENA VALENCIA G

    Full Text Available Este trabajo evalúa el efecto de la adición de calcio sobre los atributos de calidad de un caramelo blando a base de fruto de uchuva sin sacarosa, comparándolo con uno similar sin calcio. Se emplea calcio lácteo como ingrediente funcional, el cual se incorpora a granel, con el objetivo de alcanzar un valor diario de referencia mayor del 20% en una porción de 15 g de producto, según la normativa colombiana. El calcio afecta principalmente la acidez del producto (, la elasticidad (>, la cohesividad (. El caramelo adicionado presentó contenidos de 292,5 ± 9 mg Ca/porción, correspondiente a un 20 % del valor diario de referencia, lo cual permite identificar al producto con el descriptor 'Excelente fuente de calcio'. Los caramelos blandos de uchuva sin azúcar adicionados con calcio, representan una alternativa económica para cubrir necesidades de calcio en la dieta de la población

  16. La iglesia del Sagrado Corazón de Jesús en Elche. Un ejemplo de la introducción del hormigón en la arquitectura sacra

    OpenAIRE

    Spairani Berrio, Silvia; Louis Cereceda, Miguel; Spairani-Berrio, Yolanda; Huesca Tortosa, José Antonio

    2016-01-01

    La iglesia del Sagrado Corazón de Jesús (Alicante, España), es quizás, el edificio proyectado por el arquitecto D. Antonio Serrano Peral cuyo valor arquitectónico es menos conocido y reconocido en el ámbito de la historia de la arquitectura de la ciudad. Sin embargo, su construcción constituye un interesante ejemplo de arquitectura sacra, como reconoció el jurado del Ministerio de Educación Nacional en 1957, en la exposición nacional de bellas artes, al conceder al arquitecto la medalla de pr...

  17. En Caracas: una radio sin antena

    Directory of Open Access Journals (Sweden)

    José Tomás Angola

    2015-01-01

    Full Text Available Cuenta la experiencia única de la radio comunitaria Parque Central de Caracas (1994 donde al decir de su director y concesionario de la estación se necesitó compromiso, esfuerzo, romanticismo y comunidad. Creada como un sistema de seguridad y publicidad surgió por iniciativa de la Asociación de vecinos de la Etapa 1 donde viven más de 12 mil personas Funciona sin estar dentro de los patrones transmisor-Antena-Receptor, no se encuentra regulada por ninguna ley, son a decir de Marañón el medio de comunicación más libre del país donde la comunidad se expresa por sobre la economía, la técnica y la ley.

  18. Restauración de la Casa de Convalescencia de Vic, Barcelona

    Directory of Open Access Journals (Sweden)

    José Luis Vives

    2015-06-01

    Full Text Available El texto presenta un recorrido detallado por la historia, la construcción y el estado de conservación de este edificio y su estructura previo a su intervención, como interesante testimonio de las técnicas constructivas de los maestros de obra de la época barroca y neoclásica local. Acto seguido, presenta el programa funcional del mismo para agencia de emprendimiento, innovación y conocimiento del ayuntamiento de la localidad y los criterios de intervención empleados que han servido de guía a la restauración. De particular interés resulta el análisis de la construcción histórica principalmente realizada con muros de tapia y bóvedas tabicadas, la reparación de los aleros de madera con prótesis del mismo material y la intervención en las bóvedas tabicadas existentes recurriendo a la tradición constructiva local para reparar, reforzar o incluso reconstruir algunas bóvedas perdidas.

  19. Errores en la determinación de acciones

    Directory of Open Access Journals (Sweden)

    González Valle, E.

    1979-12-01

    Full Text Available This article analyses the causes of «building diseases» due to errors In the determination of actions in the following types of construction: — Flats. — Industrial buildings. — Retention walls . — Bridges. — Tanks and silos. Based on the report by the Bureau Securitas and Secotec after Investigating 2979 accidents and events, these errors would only be the first cause in 10% of the cases but this percentage will be considerably higher if the effects were also evaluated.

    En este artículo se analizan las causas de patología debidas a errores en la determinación de acciones en los siguientes tipos de construcción: ––Edificios de viviendas. ––Naves industriales. ––Muros de contención. ––Puentes. ––Depósitos y silos. Estos errores que, basados en el Informe del Bureau Securitas y Secotec, realizado sobre 2.979 siniestros, sólo serian causa primera de éstos en menos de un 10%; tendrían un porcentaje bastante mayor si se valorasen sus efectos.

  20. Edificio ex Estación de FF CC y actual sede del Gobierno, Región del Bío-Bío

    Directory of Open Access Journals (Sweden)

    Alfredo Palacios Barra

    2007-11-01

    Full Text Available Del período de la arquitectura Modernista, el edificio de la ex Estación de Ferrocarriles de Concepción, construído el año 1941, es obra del arquitecto Luis Herreros. De proporciones nobles y fachada austera, la distribución y concepción urbanística de la obra, compone un volumen horizontal de 4 pisos que logra un equilibrio a nivel de conjunto, con un eje vertical de una pronunciada torre de 24 m de altura. Este hito, constituye un importante referente urbano ubicado en la perspectiva de la ex calle Comercio, hoy Barros Arana y próximo Eje Bicentenario de Concepción, la más importante vía comercial de la ciudad.

  1. Acciones de rehabilitación frente a la entrada de gas radón Rehabilitation Measures against radon gas entry

    Directory of Open Access Journals (Sweden)

    Borja Frutos Vázquez

    2011-01-01

    Full Text Available El gas radón es un agente patológico para los usuarios de los edificios en donde se manifiesta su presencia. Por su origen, en la cadena de desintegración del uranio, conlleva efectos radiactivos que, en el organismo humano, determinan un aumento de riesgo en la generación de cáncer pulmonar. Procedente de suelos donde hay masas de granito u otros sustratos con contenidos de uranio, penetra a través de los materiales habitualmente usados en la construcción; como es el caso de las soleras de hormigón, muros de sótano, etc. Para impedir la inmisión de este gas en los espacios habitados, se pueden considerar varias actuaciones en edificios ya construidos. El objeto de este trabajo consiste en mostrar los resultados sobre reducciones de radón conseguidas por distintas soluciones constructivas que se han diseñado y ejecutado con el fin de frenar la inmisión de gas radón al interior de un prototipo de vivienda construido al efecto.Radon gas is a pathological agent for inhabitants of buildings where it is present. Due to its origin in uranium decay chain, it bears radioactive effects that inside human body lead to higher risks of developing lung cancer. It comes from soils containing granite masses or other substrates containing uranium. It enters through common material used in constructions, such as concrete ground slabs, basement walls, etc. In order to avoid such gas immission into inhabited rooms, several measurements cab be considered for existing buildings. This study intends to show the results obtained for radon reductions by means of different constructive solutions, already designed and executed so as to stop radon gas immission into a prototype building constructed for this specific purpose.

  2. Simulación de eventos discretos y líneas de balance, aplicadas al mejoramiento del proceso constructivo de la cimentación de un edificio

    OpenAIRE

    Gomez, Adriana; Ávila Díaz, Jorge Orlando; Quintana Pulido, Natalia

    2014-01-01

    El objeto de este trabajo fue establecer propuestas de mejoramiento al proceso de planeación de tiempos y costos en la etapa de cimentación de un edificio, a partir de la integración de herramientas como simulación de eventos discretos, programación con líneas de balance y metodologías Building Information Modeling – BIM -- A partir de mediciones en campo se levantó información para la elaboración de un modelo de simulación de eventos discretos que imitara el proceso constructivo real -- Se p...

  3. Novel liquid chromatography–mass spectrometry method for sensitive determination of the mustard allergen Sin a 1 in food

    OpenAIRE

    Alvarez-Llamas, Gloria; Maes, Xavier; Muñoz-García, Esther; Villalba, Mayte; Rodríguez, Rosalía; Pérez-Gordo, Marina; Vivanco, Fernando; Pérez-Gordo, Carlos; Cuesta-Herranz, Javier

    2015-01-01

    Mustard is a condiment added to a variety of foodstuffs and a frequent cause of food allergy. A new strategy for the detection of mustard allergen in food products is presented. The methodology is based on liquid chromatography analysis coupled to mass spectrometry. Mustard allergen Sin a 1 was purified from yellow mustard seeds. Sin a 1 was detected with a total of five peptides showing a linear response (lowest LOD was 5 ng). Sin a 1 was detected in mustard sauces and salty biscuit (19 ± 3 ...

  4. Estudio para la optimización de mallas estructurales de acero envolventes de edificios en altura según sus solicitaciones, en base al análisis de sus líneas isostáticas

    Directory of Open Access Journals (Sweden)

    Señís, R.

    2014-12-01

    Full Text Available The aim of the present study is determinate if the steel space grid envelope structures, for tall buildings (framed tube, are more optimal and efficient if their design is based on the isostatic lines of their equivalents structural elements according to their solicitations. In this study, 600 models of tall buildings, for different triangled façades and geometric slenderness, are analyzed. The methodology employed consisted of detecting the wind loads that affects tall buildings applying the Equivalent Static Wind Loads (ESWL in relation to the wind speed and turbulence result of the roughness terrain and the topographic. However, it was also needed to establish the frequencies and modes of vibration of each structure as well as defining the coefficients of pressure, force and moments produced by the wind. The results conclude that space grids are more efficient if they do adopt the trajectory of the main and dominant load, in this case the wind.El objetivo del presente estudio es determinar si las mallas estructurales de acero, envolventes de edificios en altura (entramado en tubo, son más óptimas y eficientes cuando su diseño se adapta a la trayectoria de las líneas isostáticas de los elementos estructurales equivalentes bajo las acciones solicitantes. Se analizan 600 modelos de edificios en altura, para distintas triangulaciones de fachada y esbelteces. Las cargas de viento que influyen sobre los edificios se determinan con el método de Cargas Estáticas Equivalentes de acuerdo a la velocidad del viento y turbulencia provocados por la rugosidad del terreno y la topografía. También será necesario determinar las frecuencias y modos de vibración propios de cada estructura, así como definir los coeficientes de presión, de fuerzas y de momentos resultantes del viento. Los resultados concluyen que las mallas ganan eficiencia cuando identifican la trayectoria de las líneas isostáticas generadas por la acción principal, el viento.

  5. Calcium isotopic composition of high-latitude proxy carrier Neogloboquadrina pachyderma (sin.

    Directory of Open Access Journals (Sweden)

    A. Eisenhauer

    2009-01-01

    Full Text Available The accurate reconstruction of sea surface temperature (SST history in climate-sensitive regions (e.g. tropical and polar oceans became a challenging task in palaeoceanographic research. Biogenic shell carbonate SST proxies successfully developed for tropical regions often fail in cool water environments. Their major regional shortcomings and the cryptic diversity now found within the major high latitude proxy carrier Neogloboquadrina pachyderma (sin. highlight an urgent need to explore complementary SST proxies for these cool-water regions. Here we incorporate the genetic component into a calibration study of a new SST proxy for the high latitudes. We found that the calcium isotopic composition (δ44/40Ca of calcite from genotyped net catches and core-top samples of the planktonic foraminifera Neogloboquadrina pachyderma (sin. is related to temperature and unaffected by genetic variations. The temperature sensitivity has been found to be 0.17 (±0.02‰ per 1°C, highlighting its potential for downcore applications in open marine cool-water environments. Our results further indicate that in extreme polar environments, below a critical threshold temperature of 2.0 (±0.5°C associated with salinities below 33.0 (±0.5‰, a prominent shift in biomineralization affects the δ44/40Ca of genotyped and core-top N. pachyderma (sin., becoming insensitive to temperature. These findings highlight the need of more systematic calibration studies on single planktonic foraminiferal species in order to unravel species-specific factors influencing the temperature sensitivity of Ca isotope fractionation and to validate the proxies' applicability.

  6. Nuevo edificio de la Lincoln Savings, en Los Angeles, California, (U.S.A.

    Directory of Open Access Journals (Sweden)

    Deasy & Boiling, Arquitectos

    1968-03-01

    Full Text Available The building has eight floor levels devoted to the main functions of the bank, a ninth storey houses various services, and a car park is located in the basement. The ground floor is highly diaphanous and is occupied by those departments that are more intimately related with the outside public. The second floor is devoted to banking and credit operations. There is a museum on the seventh floor, and a dining hall on the eighth, as well as a cafeteria and a social zone for the staff. The remaining floor space has been let for offices to a number of commercial firms. The structure and external aspect are outstanding because of their originality.El edificio consta de ocho plantas en servicio; una novena, que alberga los equipos mecánicos; y un sótano, destinado a aparcamiento. La planta baja, que goza de una gran diafanidad, aloja los servicios que exigen un contacto más frecuente con el público; en la segunda, las secciones en las que se desarrollan las operaciones de crédito y bancarias; en la planta séptima, el museo; y en la octava, el comedor, la cafetería y zona social para empleados. Las restantes plantas han sido alquiladas para oficinas de diversas firmas y empresas comerciales. Son de destacar, la estructura y el tratamiento de fachadas, de indudable gracia y originalidad.

  7. A Fuzzy Adaptive Tightly-Coupled Integration Method for Mobile Target Localization Using SINS/WSN

    Directory of Open Access Journals (Sweden)

    Wei Li

    2016-11-01

    Full Text Available In recent years, mobile target localization for enclosed environments has been a growing interest. In this paper, we have proposed a fuzzy adaptive tightly-coupled integration (FATCI method for positioning and tracking applications using strapdown inertial navigation system (SINS and wireless sensor network (WSN. The wireless signal outage and severe multipath propagation of WSN often influence the accuracy of measured distance and lead to difficulties with the WSN positioning. Note also that the SINS are known for their drifted error over time. Using as a base the well-known loosely-coupled integration method, we have built a tightly-coupled integrated positioning system for SINS/WSN based on the measured distances between anchor nodes and mobile node. The measured distance value of WSN is corrected with a least squares regression (LSR algorithm, with the aim of decreasing the systematic error for measured distance. Additionally, the statistical covariance of measured distance value is used to adjust the observation covariance matrix of a Kalman filter using a fuzzy inference system (FIS, based on the statistical characteristics. Then the tightly-coupled integration model can adaptively adjust the confidence level for measurement according to the different measured accuracies of distance measurements. Hence the FATCI system is achieved using SINS/WSN. This innovative approach is verified in real scenarios. Experimental results show that the proposed positioning system has better accuracy and stability compared with the loosely-coupled and traditional tightly-coupled integration model for WSN short-term failure or normal conditions.

  8. The 11S globulin Sin a 2 from yellow mustard seeds shows IgE cross-reactivity with homologous counterparts from tree nuts and peanut

    Directory of Open Access Journals (Sweden)

    Sirvent Sofía

    2012-12-01

    Full Text Available Abstract Background The 11S globulin Sin a 2 is a marker to predict severity of symptoms in mustard allergic patients. The potential implication of Sin a 2 in cross-reactivity with tree nuts and peanut has not been investigated so far. In this work, we studied at the IgG and IgE level the involvement of the 11S globulin Sin a 2 in cross-reactivity among mustard, tree nuts and peanut. Methods Eleven well-characterized mustard-allergic patients sensitized to Sin a 2 were included in the study. A specific anti-Sin a 2 serum was obtained in rabbit. Skin prick tests (SPT, enzyme-linked immunosorbent assay (ELISA, immunoblotting and IgG or IgE-inhibition immunoblotting experiments using purified Sin a 2, Sin a 1, Sin a 3, mustard, almond, hazelnut, pistachio, walnut or peanut extracts were performed. Results The rabbit anti-Sin a 2 serum showed high affinity and specificity to Sin a 2, which allowed us to demonstrate that Sin a 2 shares IgG epitopes with allergenic 11S globulins from tree nuts (almond, hazelnut, pistachio and walnut but not from peanut. All the patients included in the study had positive skin prick test to tree nuts and/or peanut and we subdivided them into two different groups according to their clinical symptoms after ingestion of such allergenic sources. We showed that 11S globulins contain conserved IgE epitopes involved in cross-reactivity among mustard, tree nuts and peanut as well as species-specific IgE epitopes. Conclusions The allergenic 11S globulin Sin a 2 from mustard is involved in cross-reactivity at the IgE level with tree nuts and peanut. Although the clinical relevance of the cross-reactive IgE epitopes present in 11S globulins needs to be investigated in further detail, our results contribute to improve the diagnosis and management of mustard allergic patients sensitized to Sin a 2.

  9. Degradación térmica del γ‐orizanol en pastas sin gluten

    OpenAIRE

    Soto Jover, Sonia; Boluda Aguilar, María; López Gómez, Antonio

    2014-01-01

    La harina de arroz es el cereal más adecuado para elaborar productos sin gluten, debido a sus propiedades nutricionales y antioxidantes, y a su alto contenido en γ–orizanol. Además también posee propiedades hipoalergénicas y un color y aroma suave. Dado el gran interés del γ–orizanol desde el punto de vista nutraceútico, y a que existen pocos estudios sobre el efecto de la cocción de alimentos sin gluten (elaborados con harina de arroz) sobre el contenido de γ‐orizanol, en este trabajo se est...

  10. Monumento rupestre de Vilvestre (Salamanca

    Directory of Open Access Journals (Sweden)

    Luis BENITO DEL REY

    2009-10-01

    Full Text Available En uno de los llamados montes-isla, denominado por los naturales del pueblo "El Castillo" (en el mapa del Instituto Geográfico y Catastral se denomina "El Muro", en un lateral del monte y debajo de un palomar que se levanta en la cúspide, con situación N. E., y mirando al pueblo situado en la misma falda, se encuentra el monumento. Lo llamamos monte-isla, pues, aunque nos encontramos en una zona relativamente montañosa con formación de profundos valles por el mayor de los cuales y a espaldas del monumento corre el Duero, sin embargo ninguno sobresale como esta montaña, dominando un extenso y espléndido panorama.

  11. The deadly sins of high technology: Superphenix, Eurotunnel, Ariane 5.

    International Nuclear Information System (INIS)

    Bell, R.; Jeanmougin, Ch.

    1998-01-01

    Based on a detailed analysis of civil or military high technology projects (Superphenix reactor, English Channel tunnel, Ariane 5 launcher, etc..), mainly of European origin, this book reveals seven systematic sins in the realization of these projects: an abolishment of controls, a premature construction, a manumission of suppliers, a no-share of risks attitude, political manipulations, fraudulence and secrecy. (J.S.)

  12. L'Hemisferic: Una ventana al mundo

    Directory of Open Access Journals (Sweden)

    Calatrava Valls, Santiago

    2000-12-01

    Full Text Available The "Hemisféric-Planetario" building is located in the center line East-West of the "Ciudad de las Artes y las Ciencias" complex, flanked by two rectangular lakes, in the north and in the south, respectively. In the East side we can find a promenade between the Museum and its south lake. Nevertheless its West side is virtual. and located in the area of the "Hermanos Marista 's" viaducto The building is visited, daily, by about 3.000 people, distributed between its 8 duties. The showing room holds 321 seats, four of those for wheel-chairs. The building has a possible room of 999 people (at the same time.El edificio Hemisféric-Planetarío está situado sobre el eje Este-Oeste del complejo de la Ciudad de las Artes y las Ciencias; está flanqueado por dos estanques rectangulares, al Norte y al Sur, respectivamente. Por el Este, un paseo limita la parcela con el Museo y su estanque Sur. El limite Oeste, sin embargo. es virtual y se encuentra en la proyección del viaducto de Hermanos Maristas. Este edificio es visitado diariamente por unos 3.000 personas, distribuyéndose en 8 funciones. La sala de proyección dispone de 321 butacas, con posibilidad de alojar 4 sillas de ruedas. La capacidad de acogida del edificio (al mismo tiempo es de 999 personas.

  13. Un mundo sin límites

    Directory of Open Access Journals (Sweden)

    Córdoba, Joaquín Mª

    2005-04-01

    Full Text Available A comienzos del siglo XVI, las nuevas ediciones del Atlas de Ptolomeo publicadas en Roma o Venecia solían incluir un mapamundi modificado sin cesara a medida que descubridores y navegantes alcanzaban nuevos y antes desconocidos horizontes. La temprana circunnavegación de Magallanes y Elcano (1519-1522 confirmaba con su esferidad, que el mundo no tenía límites. Durante aquel siglo magnífico, la literatura española de viajes al Oriente Próximo islámico tenía que ser menos señalada. La casi perenne guerra contra el Imperio Otomano, señor de una buena parte de las costas mediterráneas, y sobre todo la empresa de América y los viajes de exploración y conquista que aquella demandaba, …

  14. The Doctrine of Original Antigenic Sin: Separating Good From Evil.

    Science.gov (United States)

    Monto, Arnold S; Malosh, Ryan E; Petrie, Joshua G; Martin, Emily T

    2017-06-15

    The term "original antigenic sin" was coined approximately 60 years ago to describe the imprinting by the initial first influenza A virus infection on the antibody response to subsequent vaccination. These studies did not suggest a reduction in the response to current antigens but instead suggested anamnestic recall of antibody to earlier influenza virus strains. Then, approximately 40 years ago, it was observed that sequential influenza vaccination might lead to reduced vaccine effectiveness (VE). This conclusion was largely dismissed after an experimental study involving sequential administration of then-standard influenza vaccines. Recent observations have provided convincing evidence that reduced VE after sequential influenza vaccination is a real phenomenon. We propose that such reduction in VE be termed "negative antigenic interaction," given that there is no age cohort effect. In contrast, the potentially positive protective effect of early influenza virus infection later in life continues to be observed. It is essential that we understand better the immunologic factors underlying both original antigenic sin and negative antigenic interaction, to support development of improved influenza vaccines and vaccination strategies. © The Author 2017. Published by Oxford University Press for the Infectious Diseases Society of America.

  15. Impacto de la aplicación de la Ley 13059 de Eficiencia Energética en relación a la nueva Ordenanza de Usos del Suelo de la ciudad de La Plata y la Norma IRAM 11900 de Etiquetado de Edificios

    Directory of Open Access Journals (Sweden)

    Carolina Soledad Vagge

    Full Text Available El crecimiento urbano introduce permanente presión a las áreas metropolitanas. En países periféricos la demanda de energía crece a mayor velocidad que el crecimiento poblacional y la oferta, creando crisis y escasez. El objetivo principal de este trabajo es prever el impacto que tendrá la Ley 13059 de Eficiencia Energética en relación a la nueva Ordenanza de Usos del Suelo de la ciudad de La Plata y la Norma de Etiquetado de Edificios (IRAM 11900. Esta norma establece una metodología simplificada para el cálculo del nivel de eficiencia energética de las envolventes de los edificios susceptibles de ser calefaccionados. Todavía, es evidente que existe una importante falta de adecuación entre los objetivos teóricos formulados para el desarrollo de la ciudad y las conflictivas estrategias técnicas propuestas para satisfacerlos. En cuanto a la aplicación de la ley de eficiencia energética al modelo de edificio de construcción usual en La Plata, no verifica sus valores de transmitancia térmica K. Tampoco verifica el riesgo de condensación ni el coeficiente global de pérdidas G. Del mismo modo, cuando se aplica el protocolo de etiquetado de eficiencia energética que plantea la norma IRAM 11900, el edifico clasifica como H. Se puede ver que el impacto de ahorro potencial en la demanda de energía anual para calefacción, si se comienza a implementar la Ley de Eficiencia Energética sería de un 46%.

  16. A Novel Robust H∞ Filter Based on Krein Space Theory in the SINS/CNS Attitude Reference System

    Directory of Open Access Journals (Sweden)

    Fei Yu

    2016-03-01

    Full Text Available Owing to their numerous merits, such as compact, autonomous and independence, the strapdown inertial navigation system (SINS and celestial navigation system (CNS can be used in marine applications. What is more, due to the complementary navigation information obtained from two different kinds of sensors, the accuracy of the SINS/CNS integrated navigation system can be enhanced availably. Thus, the SINS/CNS system is widely used in the marine navigation field. However, the CNS is easily interfered with by the surroundings, which will lead to the output being discontinuous. Thus, the uncertainty problem caused by the lost measurement will reduce the system accuracy. In this paper, a robust H∞ filter based on the Krein space theory is proposed. The Krein space theory is introduced firstly, and then, the linear state and observation models of the SINS/CNS integrated navigation system are established reasonably. By taking the uncertainty problem into account, in this paper, a new robust H∞ filter is proposed to improve the robustness of the integrated system. At last, this new robust filter based on the Krein space theory is estimated by numerical simulations and actual experiments. Additionally, the simulation and experiment results and analysis show that the attitude errors can be reduced by utilizing the proposed robust filter effectively when the measurements are missing discontinuous. Compared to the traditional Kalman filter (KF method, the accuracy of the SINS/CNS integrated system is improved, verifying the robustness and the availability of the proposed robust H∞ filter.

  17. DNA–PKcs–SIN1 complexation mediates low-dose X-ray irradiation (LDI)-induced Akt activation and osteoblast differentiation

    Energy Technology Data Exchange (ETDEWEB)

    Xu, Yong; Fang, Shi-ji [The Department of Orthopedics, The Second Affiliated Hospital of Soochow University, Suzhou 215000 (China); Zhu, Li-juan [Jiangsu Key Laboratory of Translational Research and Therapy for Neuro-Psycho-Diseases and Institute of Neuroscience, Soochow University, Suzhou, Jiangsu 215021 (China); Zhu, Lun-qing, E-mail: xiaodongwangsz@163.com [The Center of Diagnosis and Treatment for Children’s Bone Diseases, The Children’s Hospital Affiliated to Soochow University, Suzhou, Jiangsu 215000 (China); Zhou, Xiao-zhong, E-mail: zhouxz@suda.edu.cn [The Department of Orthopedics, The Second Affiliated Hospital of Soochow University, Suzhou 215000 (China)

    2014-10-24

    Highlights: • LDI increases ALP activity, promotes type I collagen (Col I)/Runx2 mRNA expression. • LDI induces DNA–PKcs activation, which is required for osteoblast differentiation. • Akt activation mediates LDI-induced ALP activity and Col I/Runx2 mRNA increase. • DNA–PKcs–SIN1 complexation mediates LDI-induced Akt Ser-473 phosphorylation. • DNA–PKcs–SIN1 complexation is important for osteoblast differentiation. - Abstract: Low-dose irradiation (LDI) induces osteoblast differentiation, however the underlying mechanisms are not fully understood. In this study, we explored the potential role of DNA-dependent protein kinase catalytic subunit (DNA–PKcs)–Akt signaling in LDI-induced osteoblast differentiation. We confirmed that LDI promoted mouse calvarial osteoblast differentiation, which was detected by increased alkaline phosphatase (ALP) activity as well as mRNA expression of type I collagen (Col I) and runt-related transcription factor 2 (Runx2). In mouse osteoblasts, LDI (1 Gy) induced phosphorylation of DNA–PKcs and Akt (mainly at Ser-473). The kinase inhibitors against DNA–PKcs (NU-7026 and NU-7441) or Akt (LY294002, perifosine and MK-2206), as well as partial depletion of DNA–PKcs or Akt1 by targeted-shRNA, dramatically inhibited LDI-induced Akt activation and mouse osteoblast differentiation. Further, siRNA-knockdown of SIN1, a key component of mTOR complex 2 (mTORC2), also inhibited LDI-induced Akt Ser-473 phosphorylation as well as ALP activity increase and Col I/Runx2 expression in mouse osteoblasts. Co-immunoprecipitation (Co-IP) assay results demonstrated that LDI-induced DNA–PKcs–SIN1 complexation, which was inhibited by NU-7441 or SIN1 siRNA-knockdown in mouse osteoblasts. In summary, our data suggest that DNA–PKcs–SIN1 complexation-mediated Akt activation (Ser-473 phosphorylation) is required for mouse osteoblast differentiation.

  18. Edificio industrial, en Madrid

    Directory of Open Access Journals (Sweden)

    Lamela, Antonio

    1964-10-01

    talleres, modulado, se ha procurado la mayor diafanidad posible, y se ha previsto la posibilidad de cambios o ampliación en la fábrica. En la unidad dedicada a servicios y garaje, se sitúan: una estación transformadora, depósito acumulador, estación de calefacción, garaje-taller y garaje y almacén para bombonas de gas butano. Las viviendas son independientes, existiendo la debida diferenciación entre las zonas de convivencia diurna y nocturna. La estructura y los materiales utilizados se manifiestan de una manera rotunda y sin mixtificaciones de ninguna clase, habiéndose logrado, con acierto, sacar el máximo aprovechamiento de sus cualidades estéticas y plásticas.

  19. La sede del Archivo de Estado de Florencia

    Directory of Open Access Journals (Sweden)

    Blanca González Talavera

    2009-12-01

    Full Text Available Los protagonistas del presente artículo son el glorioso palacio de los Uffizi (siglo XVI y la nueva sede para archivo de Piazza Beccaria en Florencia (siglo XX, reflejo de sociedades y culturas opuestas en el tiempo, pero  sin  embargo unidos en  su  responsabilidad: custodiar el Archivo de  Estado de  Florencia.  El  análisis histórico-artístico de cada uno de los edificios como “continentes” de un grueso documental de incalculable valor  es el principal  objetivo  de este  artículo.

  20. Seguimiento de la construcción de 68 viviendas, locales y aparcamiento en Mislata

    OpenAIRE

    ORTIZ GARCÍA, ENRIQUE JAVIER

    2011-01-01

    Convenios con empresa. El objeto del proyecto es la construcción de un edificio de 68 viviendas en régimen mixto (53 unidades de Protección Oficial y 15 viviendas libres), locales comerciales en planta baja y garaje, situado en c/San Antonio y c/en proyecto en Mislata, Valencia. Las viviendas de Protección Oficial se encuentran en las plantas 1ª a 5ª, mientras que las viviendas libres se encuentran en las plantas ático y sobreático; los locales comerciales en planta baja, sin uso específico y...

  1. La Casa dell’abate a San Giovanni in Persiceto: Indagini conoscitive e questioni operative per la conservazione di un «edificio-fossile»

    Directory of Open Access Journals (Sweden)

    Squassina, Angela Paola

    2008-12-01

    Full Text Available The Abbot’s House in St. Giovanni in Persiceto (Bologna is a «fossil-building», one of the few surviving timber-framed buildings in Italy, probably the seat of the Abbot of the monastery of Nonantola. It is very interesting because of its rarity, age, building type and the presence of an almost millenarian stratigraphy. The Abbot’s House has been subjected to a slow but continuous transformation process – through a gradual replacement of wooden elements by masonry – modifying its storehouse function for a prevalently residential one. Restoration works in the 1960s deeply modified the structural frame and renewed the external surfaces, transforming thus the old image of the building and making difficult its archaeological analysis. This circumstance makes to think about the relationship between stratigraphic legibility and preservation of material authenticity. Reliability of stratigraphic instrument becomes reduced in such a modified building, being required a different use of stratigraphy by adapting its codes and modes to the study case. The adaptation to different recording conditions gives stratigraphy a different and more articulated role – if it is organically included in the preservation project – and stratigraphic legibility may become a precious alteration index and a technical and cultural project criterion. It becomes a control of transformations, leading to the idea of a minimal intervention and respect toward the fragmentary survivals of past times and of their stratigraphic legibility.manufatto medioevale a struttura mista in legno e muratura, uno dei pochi superstiti in Italia, probabile sede dell’Abate del Monastero di Nonantola. Si tratta di un «edificio-fossile», oggetto di grande interesse data la rarità, l’antichità della struttura e delle modalità costruttive, nonché per la presenza di una stratificazione quasi millenaria. La Casa dell’Abate è stata infatti sottoposta ad un lento ma continuo

  2. Estudio teórico y experimental sobre los morteros para muros resistentes de fábrica de ladrillo para la actualización de la Norma Básica MV 201-1972

    Directory of Open Access Journals (Sweden)

    Monterde Comba, Guillermo J.

    1984-12-01

    Full Text Available This theoretical and experimental study on cement or lime and cement mortars brings up to date the contents of Chapter 3: MORTARS, of Norm MV 201-1972 "Resistant brick-work walls" which lost its validity when disappeared portland cement P-250, substituted by portland cement PA-350 with active additions, prescribed in the new Standard RC-75 "Standard of general technical prescriptions for cements acceptance" being obligatory its fulfilment.

    El presente estudio teórico y experimental sobre morteros, de cemento o de cal y cemento, constituye la puesta al día del contenido del Capítulo 3º MORTEROS, de la Norma MV 201-1972 "Muros resistentes de fábrica de ladrillo'', que perdió su vigencia con la desaparición del cemento portland P-250, sustituido por el cemento portland PA-350 con adiciones activas prescrito en el nuevo Pliego RC-75 "Pliego de prescripciones técnicas generales para la recepción de cementos" de obligado cumplimiento.

  3. Edificio de la American Zinc Co. - St. Louis - Missouri – (EE. UU.

    Directory of Open Access Journals (Sweden)

    Hellmuth, George

    1978-12-01

    Full Text Available This design serves two very clearly distinct purposes: on the one hand, the three office floors, 2,800 m2 each, assure a high degree of interior lay-out flexibility, and on the other, the exterior appearance displays the nature of the Company, active in the metal field. For the first purpose, two piers 15 m appart on the main façade leave free from obstacles the entire floor space of the several storeys, while for the other purpose, the stinless-steel-covered outside surfaces form an Identification sign for the Company occupying the buildings. The inpressively broad bays between piers that turn the ground floor into a virtually diaphanous and unobstructed area, give the feeling of a very light building, almost suspended in mid-air.

    El proyecto satisface dos objetivos claramente definidos: por un lado asegura, para las plantas de oficina —tres en total, con 2.800 m2 de superficie—, un alto grado de flexibilidad en la distribución interior, y por otro refleja, exteriormente, la naturaleza de la empresa, dedicada al ramo de la metalurgia. Para el primer propósito se dispusieron sobre la fachada principal dos pilares distanciados unos 15 m entre sí, que dejan libres de obstáculos toda la superficie de las plantas. Para el otro fin se utilizó un revestimiento de fachadas con módulos de acero inoxidable, como signo de identidad para la compañía. Destaca en la obra la imponente luz entre pilares que, al dejar prácticamente diáfana la planta baja, dan al edificio la impresión de un volumen ligero, casi suspendido en el aire.

  4. Development and preliminary validation of a measure of social inclusion for use in people with mental health problems: the SInQUE.

    Science.gov (United States)

    Mezey, Gillian; White, Sarah; Thachil, Ajoy; Berg, Rachel; Kallumparam, Sen; Nasiruddin, Omar; Wright, Christine; Killaspy, Helen

    2013-08-01

    Social exclusion can be both a cause and a consequence of mental health problems. Socially inclusive practice by mental health professionals can mitigate against the stigmatizing and excluding effects of severe mental illness. To develop and test the validity of a measure of social inclusion for individuals with severe mental illness - the Social Inclusion Questionnaire User Experience (SInQUE). The domains of the SInQUE were chosen to reflect the domains of social inclusion identified in the Poverty and Social Exclusion Survey. Patients with severe mental illness were recruited from rehabilitation, general and forensic psychiatric services and were asked to complete the questionnaire in an individual interview with a researcher. Sixty six patients with schizophrenia and schizoaffective disorder completed the SInQUE, alongside measures of psychiatric symptoms, needs and quality of life, to assess its acceptability, and concurrent and construct (convergent and discriminant) validity. The SInQUE took 45 minutes to complete and was found to have good concurrent and discriminant validity. Convergent validity was established for two domains: social integration and productivity. Preliminary findings suggest that the SInQUE may be a useful tool for assessing and monitoring social inclusion in individuals with severe mental illness. It has construct and concurrent validity with measures of unmet need and quality of life in this group. Further testing of the reliability of the SInQUE on a larger population is indicated.

  5. Rapid Transfer Alignment of MEMS SINS Based on Adaptive Incremental Kalman Filter.

    Science.gov (United States)

    Chu, Hairong; Sun, Tingting; Zhang, Baiqiang; Zhang, Hongwei; Chen, Yang

    2017-01-14

    In airborne MEMS SINS transfer alignment, the error of MEMS IMU is highly environment-dependent and the parameters of the system model are also uncertain, which may lead to large error and bad convergence of the Kalman filter. In order to solve this problem, an improved adaptive incremental Kalman filter (AIKF) algorithm is proposed. First, the model of SINS transfer alignment is defined based on the "Velocity and Attitude" matching method. Then the detailed algorithm progress of AIKF and its recurrence formulas are presented. The performance and calculation amount of AKF and AIKF are also compared. Finally, a simulation test is designed to verify the accuracy and the rapidity of the AIKF algorithm by comparing it with KF and AKF. The results show that the AIKF algorithm has better estimation accuracy and shorter convergence time, especially for the bias of the gyroscope and the accelerometer, which can meet the accuracy and rapidity requirement of transfer alignment.

  6. Rapid Transfer Alignment of MEMS SINS Based on Adaptive Incremental Kalman Filter

    Directory of Open Access Journals (Sweden)

    Hairong Chu

    2017-01-01

    Full Text Available In airborne MEMS SINS transfer alignment, the error of MEMS IMU is highly environment-dependent and the parameters of the system model are also uncertain, which may lead to large error and bad convergence of the Kalman filter. In order to solve this problem, an improved adaptive incremental Kalman filter (AIKF algorithm is proposed. First, the model of SINS transfer alignment is defined based on the “Velocity and Attitude” matching method. Then the detailed algorithm progress of AIKF and its recurrence formulas are presented. The performance and calculation amount of AKF and AIKF are also compared. Finally, a simulation test is designed to verify the accuracy and the rapidity of the AIKF algorithm by comparing it with KF and AKF. The results show that the AIKF algorithm has better estimation accuracy and shorter convergence time, especially for the bias of the gyroscope and the accelerometer, which can meet the accuracy and rapidity requirement of transfer alignment.

  7. A kinetic model to explain the grain size and organic matter content dependence of magnetic susceptibility in transitional marine environments: A case study in Ria de Muros (NW Iberia)

    Science.gov (United States)

    Mohamed, Kais J.; Andrade, Alba; Rey, Daniel; Rubio, Belén.; Bernabeu, Ana María.

    2017-06-01

    Magnetic minerals in marine sediments are sensitive indicators of processes such as provenance changes, climatic controls, pollution, and postdepositional geochemical changes. Magnetic susceptibility is the bulk property of the sediments most commonly used to understand the magnetic characteristics of sediments. Before conclusions can be drawn from changes in this parameter, it is important to understand what factors and to what extent control changes in magnetic susceptibility. The magnetic susceptibility of surficial sediments in the Galician Rias Baixas, in NW Spain, has been shown to covary with sediment texture and organic matter content. Downcore, the magnetic properties of these sediments experience drastic changes as a result of strong dissolution caused by early diagenesis. In this paper, we further explore the relationship between these factors and formalize the observed covariations as the result of a simple second-order kinetic model dependent on the content of organic matter in surficial sediments in the Ria de Muros. The reanalysis of previously reported data from the Rias de Vigo and Pontevedra confirmed the validity of this model and suggested further controls such as wave climate and water depth in the rates at which magnetic susceptibility changes are controlled by organic matter content.

  8. Mansion Nolan en Worcester Park - Surrey - Gran Bretaña

    Directory of Open Access Journals (Sweden)

    Stout & Litchfield, Arquitectos

    1973-04-01

    Full Text Available The site is the end plot in a cul-de-sac of new houses, in the immediate neighbourhood of an old convent. The house is designed as two identical flats: — on the ground floor the entrance hall, the children's bedrooms, bathroom, dining room and kitchen, — on the first floor the parents bedroom with bathroom suite and living room, both open onto a roof terrace. The walls are constructed of while sandlime bricks with white pointing, cavity and light-weight concrete insulating blocks internally. The roofs are externally clad with natural slate and internally with Columbian Pine boarding. The slope of the roof is exposed internally. Walls are white painted throughout and the floors are covered with grey haircord carpet. The staircase is made of Columbian Pine and is open tread. Heating is by gas fired ducted warm air.Esta vivienda se ha construido en la parcela final de un fondo de saco, situado en las proximidades de un antiguo convento. El edificio consta de dos plantas: - en la baja se han dispuesto, además de la entrada, los dormitorios de los niños, un cuarto de baño, el comedor y la cocina, y - en la primera, el dormitorio de los padres, con cuarto de baño y una sala de estar, abiertos ambos sobre amplias terrazas. Sistema constructivo: muros exteriores construidos con ladrillo blanco, rejuntados con mortero blanco; los muros interiores y huecos se realizaron con placas o bloques de hormigón ligero aislado, pintados de blanco posteriormente. En el interior se respetó la inclinación de la cubierta, revistiéndola con un entablado de pino colombiano; en el exterior se utilizó un recubrimiento de pizarra natural. Los suelos están enmoquetados, con alfombras de pelo, de color gris. La calefacción se consigue por conducciones de aire caliente, producido por estufa de gas.

  9. Protegiendo a su familia de los terremotos-Los siete pasos a la seguridad para prepararse en caso de un terremoto (en espa?ol y en ingles)

    Science.gov (United States)

    Desarrollado por American Red Cross, Asian Pacific Fund

    2007-01-01

    Les escribimos esta carta para comunicarle un mensaje sumamente importante sobre las preparaciones de emergencia. Historicamente, hemos sufrido terremotos aqui en el Area de la Bahia de San Francisco que han causado graves privaciones para los residentes de la comunidad y da?os increibles a nuestras ciudades. Es probable que suframos un terremoto de gran magnitud en los proximos 30 a?os. Muchos de nosotros venimos de otros paises donde hemos pasado por terremotos y por eso creemos entenderlos. Sin embargo, la manera que nos preparamos para terremotos en nuestros paises de origen puede ser distinta a la que empleamos aca en los Estados Unidos. Muy pocas personas mueren a causa de los derrumbes de los edificios en el Area de la Bahia porque la mayoria de los edificios son construidos para resistir el sacudimiento de la tierra. Pero es muy probable que su familia no tenga atencion medica, alimentos o que esten separados del uno al otro por dias o semanas. Finalmente depende de usted mantener a su familia a salvo hasta que llegue asistencia, por eso les pedimos que nos unamos para aprender a cuidar a su familia antes, durante, y despues de un terremoto. El primer paso es leer este libro. Cada uno de su familia, ni?os y adultos, pueden aprender como prepararse para un terremoto. Haga participar e incluya sus ni?os; pueden ayudarle a prepararse. Aproveche las clases ofrecidas en su comunidad sobre las preparaciones de terremotos por la Cruz Roja Estadounidense (American Red Cross). Estos cursos de preparacion son gratis y disponibles en espa?ol para todos en la comunidad sin tomar en cuenta la historia de la familia, estado legal, genero o edad. Les recomendamos que tome ventaja de estas clases gratuitas. Para mas informacion consulte la ultima pagina de este libro. Recuerde que un terremoto puede ocurrir sin aviso y la unica manera de reducir el da?o de terremotos es estar preparados. !Preparese!

  10. $\\sin(2\\beta)$ with $B^0 \\rightarrow\\!J/\\!\\psi K_\\text{S}$ at the LHCb experiment

    CERN Multimedia

    Niet, Ramon

    2015-01-01

    The poster presents the recent measurement of $\\sin(2\\beta)$ using $B^0$ decays to the $J/\\!\\psi K_\\text{S}$ final state. The measurement is based on a dataset corresponding to an integrated luminosity of 3.0$\\,\\text{fb}^{-1}$ collected with the LHCb experiment in proton-proton collisions at center-of-mass energies of 7 and 8 TeV. To control penguin pollutions in the determination of $\\sin(2\\beta)$, $B_s^0$ decays to the same final state can be analysed. The results of the corresponding analysis are presented as well.

  11. Determination of wafer bonding mechanisms for plasma activated SiN films with x-ray reflectivity

    Energy Technology Data Exchange (ETDEWEB)

    Hayashi, S [Department of Materials Science and Engineering, University of California, Los Angeles, CA 90095 (United States); Sandhu, R [Department of Materials Science and Engineering, University of California, Los Angeles, CA 90095 (United States); Wojtowicz, M [Northrop Grumman Space Technology, Redondo Beach, CA 90278 (United States); Sun, Y [Department of Chemical Engineering, University of California, Los Angeles, CA 90095 (United States); Hicks, R [Department of Chemical Engineering, University of California, Los Angeles, CA 90095 (United States); Goorsky, M S [Department of Materials Science and Engineering, University of California, Los Angeles, CA 90095 (United States)

    2005-05-21

    Specular and diffuse x-ray reflectivity measurements were employed for wafer bonding studies of surface and interfacial reactions in {approx}800 A thick SiN films deposited on III-V substrates. CuK{sub {alpha}}{sub 1} radiation was employed for these measurements. The as-deposited films show very low surface roughness and uniform, high density SiN. Reflectivity measurements show that an oxygen plasma treatment converts the nitride surface to a somewhat porous SiO{sub x} layer (67 A thick, at 80% of SiO{sub 2} density), with confirmation of the oxide formation from x-ray photoelectron spectroscopy. Reactions at the bonded interface of two oxygen plasma treated SiN layers were examined using a bonded structure from which one of the III-V wafers is removed. Reflectivity measurements of bonded structures annealed at 150 deg. C and 300 deg. C show an increase in the SiO{sub x} layer density and thickness and even a density gradient across this interface. The increase in density is correlated with an increase in bond strength, where after the 300 deg. C anneal, a high interfacial bond strength, exceeding the bulk strength, was achieved.

  12. Gas diffusion ultrabarriers on polymer substrates using Al2O3 atomic layer deposition and SiN plasma-enhanced chemical vapor deposition

    International Nuclear Information System (INIS)

    Carcia, P. F.; McLean, R. S.; Groner, M. D.; Dameron, A. A.; George, S. M.

    2009-01-01

    Thin films grown by Al 2 O 3 atomic layer deposition (ALD) and SiN plasma-enhanced chemical vapor deposition (PECVD) have been tested as gas diffusion barriers either individually or as bilayers on polymer substrates. Single films of Al 2 O 3 ALD with thicknesses of ≥10 nm had a water vapor transmission rate (WVTR) of ≤5x10 -5 g/m 2 day at 38 deg. C/85% relative humidity (RH), as measured by the Ca test. This WVTR value was limited by H 2 O permeability through the epoxy seal, as determined by the Ca test for the glass lid control. In comparison, SiN PECVD films with a thickness of 100 nm had a WVTR of ∼7x10 -3 g/m 2 day at 38 deg. C/85% RH. Significant improvements resulted when the SiN PECVD film was coated with an Al 2 O 3 ALD film. An Al 2 O 3 ALD film with a thickness of only 5 nm on a SiN PECVD film with a thickness of 100 nm reduced the WVTR from ∼7x10 -3 to ≤5x10 -5 g/m 2 day at 38 deg. C/85% RH. The reduction in the permeability for Al 2 O 3 ALD on the SiN PECVD films was attributed to either Al 2 O 3 ALD sealing defects in the SiN PECVD film or improved nucleation of Al 2 O 3 ALD on SiN.

  13. GaN-based FETs using Cat-CVD SiN passivation for millimeter-wave applications

    International Nuclear Information System (INIS)

    Higashiwaki, Masataka; Mimura, Takashi; Matsui, Toshiaki

    2008-01-01

    We have found that SiN passivation by catalytic chemical vapor deposition (Cat-CVD) can significantly increase an electron density of an AlGaN/GaN heterostructure field-effect transistor (HFET). This effect enables thin-barrier HFET structures to have a high-density two-dimensional electron gas and leads to suppression of short-channel effects. We fabricated 30-nm-gate Al 0.4 Ga 0.6 N(8 nm)/GaN HFETs using Cat-CVD SiN. The maximum drain current density and extrinsic transconductance were 1.49 A/mm and 402 mS/mm, respectively. Current-gain cutoff frequency and maximum oscillation frequency of the HFETs were 181 and 186 GHz, respectively. These high-frequency device characteristics are sufficiently high enough for millimeter-wave applications

  14. Mantenimiento y conservación de edificios: agentes que intervienen en la gestión y explotación del parque inmobiliario

    Directory of Open Access Journals (Sweden)

    García Navarro, Justo

    1995-12-01

    Full Text Available During the last two decades, and specially at the end of the eighties and the beginning of the nineties, the professional specialization in building maintenance, and also the concept of "Integral Maintenance", were both developed in Spain. There are not many new contributions in this field. In most cases, techniques and ideas implanted and used in countries with higher real estate culture and tradition were imported. This paper is based on the conclusions of a conference celebrated last year in the "Fundación Cultural COAM" of the Architects Association of Madrid, and it was included in a Course of Specialization in Building Maintenance. Different agents involved in building management were discussed as well as the basis of the "Integral Maintenance" It would be necessary to say that the structural, finishing materials and facilities aspects have not deep analyzed, because of they were separately studied in other conferences of the mentioned Course.

    Durante las dos últimas décadas y especialmente en los últimos años ochenta y primeros de los noventa, la especialización profesional en el campo del mantenimiento y conservación de los edificios, así como la implantación del concepto de "mantenimiento integral " del inmueble, se han desarrollado en España de una manera clara y progresiva. No se han realizado muchas aportaciones originales, sino que en la mayoría de los casos se han extrapolado técnicas y planteamientos ya contrastados en otros países con una mayor cultura y tradición inmobiliarias. Este artículo -que surge como conclusiones de una conferencia impartida en el Curso de Especialización en Mantenimiento y Conservación de Edificios, celebrado por la Fundación Cultural COAM del Colegio Oficial de Arquitectos de Madrid el pasado año-, se abordan distintos agentes que intervienen en la gestión y explotación de un inmueble, y su tratamiento de manera conjunta, como base del "mantenimiento integral”. Conviene

  15. Modelado paramétrico de edificios en el aula de matemáticas

    Directory of Open Access Journals (Sweden)

    Raúl Manuel Falcón Ganfornina

    2012-07-01

    Full Text Available El estudio analítico de curvas y superficies adquiere una importancia significativa en estudios universitarios asociados a Arquitectura y Edificación, si bien suele desarrollarse en el aula de Matemáticas únicamente a nivel teórico. No obstante, cualquier herramienta informática de diseño gráfico que utilice el alumnado a lo largo de su vida académica y profesional a la hora de modelar proyectos arquitectónicos se basa internamente en una computación matemática de todos y cada uno de los elementos que intervienen en el mismo, si bien el usuario no llega a vislumbrar el vínculo existente entre su proyecto y la base matemática en la que se fundamenta. El uso de herramientas informáticas que permitan modelar curvas y superficies a partir de sus ecuaciones paramétricas se convierte por tanto en un nexo de unión, que se potencia aún más en cuanto se procede a modelar construcciones arquitectónicas reales. En este sentido, el presente artículo muestra cómo, haciendo uso de su conocimiento matemático y de la información disponible en internet, el alumnado de la asignatura de Matemática Aplicada a la Edificación en el Grado de Ingeniería de Edificación de la Universidad de Sevilla ha realizado como experiencia docente el modelado matemático de un conjunto de edificios de estructura no trivial. La mejora del rendimiento académico es también analizada.

  16. Edificio para ambulatorio San Francisco – (EE. UU.

    Directory of Open Access Journals (Sweden)

    Reid, John Lyon

    1976-12-01

    Full Text Available The 50,470 m2 the total area of the hospital is distributed as follows: 18,900 m2 for the 22 main clinics and for the additional clinics; 2,770 m2 for complementary activities; and the remaining 28,800 m2 for a parking lot with space for 700 cars. The building occupies a site that slopes strongly towards the north across which runs the pedestrian access from one of the circumference roads to the main façade; the access road for the vehicles leads to the back facade, where the natural slope of the ground has been taken advantage of to build the 5 storey parking building. The two main functions —the clinics and the parking house— are conveniently separated though connected with each other by means of corridors and lifts. The interior design of the clinics is very flexible so as to allow for further enlargements. The patients' waiting rooms are provided with a glazed façade and have a beautiful view over the San Francisco Bay and its surroundings. The construction is entirely of concrete and its structure is calculated ín such a manner as to allow for two additional storeys.Cuenta con una superficie total construida de 50.470 m2, repartidos de la siguiente forma: 18.900 se destinan a la distribución de 22 clínicas principales y otras secundarias; 2.770 a locales de actividades complementarias; y el resto, 28.800 m2, a aparcamiento con capacidad para 700 plazas. El edificio ocupa una parcela fuertemente inclinada hacia el norte, inclinación que permite el acceso peatonal a la clínica, por la fachada principal, desde una de las avenidas perimetrales; y el vehicular, por la fachada posterior, en donde, aprovechando el desnivel del terreno, se han organizado las cinco plantas del aparcamiento. Las dos funciones principales —clínicas y aparcamiento— se hallan convenientemente separadas, estableciéndose el enlace entre los distintos niveles mediante ascensores que relacionan las clínicas, el centro médico, los aparcamientos

  17. Valoración de riesgos inducidos por la construcción de nuevos edificios en el campus de la Universidad de Deusto. España

    Directory of Open Access Journals (Sweden)

    Saiz de Omeñaca, Jesús

    1990-06-01

    Full Text Available A study of the morphology of the basin adjacent to a projected construction site revealed that this building and others nearby could suffer serious damage in the event of flash flooding. In order to evaluate this risk, a number of factors were calculated; the amount of water that could fall onto the basin in case of extraordinary precipitation, the permeability of the soils and regoliths, the retention capacity of the vegetation, etc. After studying a number of possible solutions it was decided that a drainage gallery should be built. The dimensions and layout of this gallery would guarantee adequate drainage, make periodic cleaning possible and improve the geotechnic conditions in the area adjacent to the building site. A number of other recommendations were made with special emphasis on the importance of conserving the soils, regoliths and vegetation of the basin. Now that the project has been completed and a period of time has passed, it can be asserted that the proposed solution has functioned perfectly without any unforeseen problems.

    El estudio de la morfología de una cuenca adyacente a los terrenos donde se proyectaba construir un gran edificio, reveló que éste y otras construcciones podrían resultar seriamente dañadas a causa de avenidas violentas. Para valorar tal riesgo, se calculó la cantidad de agua que en caso de precipitaciones extraordinarias caería en la cuenca, la permeabilidad de la misma, las posibilidades de retención por la vegetación, los suelos y los recubrimientos geológicos y diversos factores capaces de agravar la situación. Se estudiaron posibles soluciones, eligiéndose la construcción de una galería de drenaje cuyo trazado y dimensiones garantizaba no solamente una correcta evacuación, sino también la posibilidad de que fuera sometida periódicamente a limpieza y unas mejores condiciones geotécnicas en la parte de la vaguada contigua a la construcción. Se realizaron también diversas

  18. Protective effects of Lagerstroemia speciosa on 3-morpholinosydnonimine (SIN-1)-induced oxidative stress in HIT-T15 pancreatic β cells.

    Science.gov (United States)

    Song, Jia-Le; Zhao, Xin; Wang, Qiang; Zhang, Ting

    2013-05-01

    Reactive oxygen species (ROS)-induced pancreatic β cell death affects insulin secretion and is important in the pathogenesis of diabetes. Lagerstroemia speciosa, a traditional folk medicine, has been used for t he prevention and treatment of diabetes. However, whether Lagerstroemia speciosa has a cytoprotective effect on pancreatic β cells remains to be elucidated. The present study aimed to investigate the cytoprotective effects of hot water extracts from Lagerstroemia speciosa leaves (LWE) on 3-morpholinosydnonimine (SIN-1)-induced oxidative damage in Syrian hamster pancreatic insulinoma HIT-T15 cells. The HIT-T15 cells were first treated with SIN-1 (50 µM) for 24 h and then co-incubated with LWE for 48 h. SIN-1 significantly decreased HIT-T15 cell viability (PHIT-T15 cells in a dose‑dependent manner. To further investigate the protective effects of LWE on SIN-1‑induced oxidative stress in HIT-T15 cells, the cellular levels of ROS, lipid peroxidation and endogenous antioxidant enzymes, including superoxide dismutase (SOD), catalase (CAT) and glutathione peroxidase (GSH-px), were determined. LWE decreased the intracellular levels of ROS and lipid peroxidation, and increased the activities of antioxidant enzymes. These results suggest that LWE has a cytoprotective effect against SIN-1‑induced oxidative stress in HIT-T15 cells through the inhibition of lipid peroxidation, a decrease in ROS levels and an increase in antioxidant enzyme activity. In addition, LWE increased insulin secretion in SIN-1-treated HIT-T15 cells. Our results suggested that LWE were effective in the treatment of diabetes. Further studies are required to study the anti-diabetic molecular mechanism in a cell model.

  19. Ten Sins Challenging Education in the Contemporary Global Era: A Philosophical Essay

    Science.gov (United States)

    Sinagatullin, Ilghiz M.

    2004-01-01

    According to this author, the modern epoch is characterized by a decrease of vital spirituality and an increase of materialistic values and virtues. This article discusses what the author views as the ten sins challenging education in the contemporary global era. These are: (1) the shrinking of spiritual values; (2) corruption; (3) sexual…

  20. El control adaptativo en instalaciones existentes y su potencial en el contexto del cambio climático.

    Directory of Open Access Journals (Sweden)

    Daniel Sánchez-García

    2017-12-01

    Full Text Available En la actualidad, la mayoría de los edificios de oficinas tienen un elevado consumo energético provocado principalmente por el uso de los sistemas de HVAC, en los que se logra el confort térmico sin considerar las implicaciones energéticas. Los objetivos de la investigación que aquí se expone es reducir la demanda y consumo energético, manteniendo altos niveles de confort térmico adaptativo, en base a la aplicación de temperaturas de consigna adaptativas calculadas según la norma EN 15251, como también identificar el potencial de estos procedimientos en el contexto del cambio climático de los años 2020, 2050 y 2080. Para ello, se desarrolla una metodología que contempla fases de (1 recopilación de datos; (2 trabajo de campo –monitoreo de las temperaturas del edificio y realización de encuestas de confort térmico-; (3 validado del modelo de simulación, en base a temperatura, voto medio predictivo (PMV y consumo energético; (4 simulaciones; y (5 obtención de resultados. Como aplicación del método se selecciona un edificio de reciente construcción en Sevilla (España que cumple la normativa vigente. Los resultados muestran reducciones muy importantes en la demanda y consumo energético, con valores entre 52% y 63% y entre 51% y 61%, respectivamente, dependiendo del escenario climático analizado.

  1. Vivienda del doctor Eichhorn - Düsseldorf - Alemania Federal

    Directory of Open Access Journals (Sweden)

    Schneider-Esleben, P.

    1973-04-01

    Full Text Available The house, designed in a linear way, comprises the living flat and the basement. The house comprises parents and children's bedrooms, study, bathroom, living room, dining room, kitchen, and a swimming-pool covered with a pergola which limits the building in the north. The living room is extended by means of a hall reaching into the garden. The walls are constructed of brick-work and cement mortar. The roof is flat, in reinforced concrete with concrete edge beams.Se trata de una vivienda de tipo lineal, compuesta de planta noble y sótano, en la que están dispuestos de modo sucesivo: los dormitorios de matrimonio y de niños, un cuarto de trabajo, cuarto de baño, sala de estar, comedor, cocina y una piscina, cubierta por una pérgola, que limita la construcción por el lado norte. La sala de estar se prolonga, perpendicularmente al resto del edificio, mediante un vestíbulo que se extiende hasta el jardín. La construcción se realizó con muros de fábrica de ladrillo y mortero de cemento. La cubierta es plana, de hormigón armado, con vigas de borde también de hormigón.

  2. Efectos a largo plazo de los síntomas depresivos en una tarea de memoria de trabajo con y sin interferencia atencional

    Directory of Open Access Journals (Sweden)

    Silvia Botelho de Oliveira

    2015-01-01

    Full Text Available La neurobiología de la depresión involucra cambios estructurales del sistema nervioso relacionados con procesos cognitivos como la memoria y la atención. El objetivo del presente estudio fue evaluar el efecto a largo plazo de la sintomatología depresiva (SD en una tarea de memoria de trabajo visual con y sin interferencia atencional en estudiantes universitarios. Se utilizó un diseño factorial de 2 × 2 en el cual las variables independientes fueron la condición clínica (con SD y sin SD y la versión del Memonum (con o sin interferencia de color. Memonum es un software para evaluar memoria de trabajo por medio de la retención de dígitos directos, en dos versiones: una blanco-negro (sin interferencia y otra con un distractor atencional de color (con interferencia. Para la evaluación de la SD, 76 universitarios respondieron al CES-D, luego se les aplicó aleatoriamente una u otra versión de la prueba Memonum (con o sin interferencia de color, 2 semanas después de la detección de síntomas. De manera general, la SD no alteró a largo plazo el desempeño de los participantes en tareas de memoria de trabajo visual con o sin interferencia atencional. Sin embargo, se pudo establecer que la utilización de las estrategias para la ejecución de la tarea mnemónica dependió de la condición clínica, y la agrupación fue la menos usada por los participantes con SD.

  3. Gerrit Rietveld. Casas después de la Schroeder

    Directory of Open Access Journals (Sweden)

    Rafael García

    1997-07-01

    Full Text Available Las historias de la arquitectura moderna han incidido una y otra vez en un reducido número de obras que por su insistente atención, han llegado a convertirse en hitos imprescindibles. Entre estos edificios canónicos y prácticamente obligados, está la célebre casa Schröder-Schräder (1924' del arquitecto holandés Gerrit Rietveld. Ampliamente conocida por el público interesado, su gran popularidad ha tenido sin embargo, el efecto de dejar en segundo plano el resto de su obra arquitectónica. A ello se debe añadir además, el hecho de que su trayectoria está fundamentalmente asociada al movimiento neoplasticista, lo que ha tenido por resultado desviar la atención de una obra posterior, más difícilmente clasificable. Sin embargo, ello no significa que dicha obra sea en absoluto carente de atractivo.

  4. Salud, calidad de vida y consumo de sustancias en función del tiempo en situación sin hogar

    Directory of Open Access Journals (Sweden)

    Sonia Panadero-Herrero

    2014-01-01

    Full Text Available Este artículo tiene como objetivo principal conocer las características diferenciales de aquellas personas que están "recién" llegadas a la situación sin hogar frente a aquellas que llevan un largo tiempo en dicha situación. Concretamente en este artículo se presentan los resultados de la comparación en diferentes variables (calidad de vida, salud, etc. entre personas sin hogar que llevaban menos de un año en esa situación y personas sin hogar que llevaban más de 5 años, con la intención de profundizar en el efecto de la situación sin hogar e identificar variables diferenciales que permitan avanzar en la identificación de necesidades específicas, favoreciendo así la planificación de servicios y recursos ajustados a las necesidades de cada grupo y momento. Los resultados apuntan diferencias importantes entre ambos grupos que parecen indican un mayor deterioro entre aquellos que llevan más tiempo en la situación sin hogar (mayor consumo de alcohol y otras sustancias, más discapacidades, etc. así como unas mayores carencias (duermen en mayor medida literalmente en la calle, ejercen en mayor medida la mendicidad, etc..

  5. L’arte di murare in mattoni a Milano dal IV al XIV secolo. Considerazioni sullo stato delle attuali conoscenze e percorsi di ricerca

    Directory of Open Access Journals (Sweden)

    Fieni, Laura

    2005-12-01

    Full Text Available En este artículo se presentan los resultados de un amplio estudio realizado en la basílica de San Lorenzo Maggiore de Milán, que ha tenido como objeto analizar la historia del edificio. El conjunto arquitectónico fue excavado sin control arqueológico en el curso de la restauración realizada por G. Chierici en los años 1936-1943, por lo que ha sido necesario diseñar una estrategia compleja que permitiese la revisión de la secuencia constructiva, recurriendo a análisis arqueológicos y arqueométricos. Para llevar a cabo esta labor se ha realizado una lectura estratigráfica de los paramentos conservados, un estudio de los materiales constructivos empleados, un análisis de las dimensiones de los ladrillos y una caracterización petrográfica de las argamasas utilizadas. Se han obtenido, asimismo, nuevas dataciones a través de la técnica del radiocarbono y de la termoluminiscencia. A partir de estos estudios se ha realizado una revisión de la historia del edificio desde período tardoantiguo hasta el medieval.

  6. Linajes férreos: uso tipológico de precedentes ferroviarios en Albert Kahn

    Directory of Open Access Journals (Sweden)

    Luis Pancorbo

    2016-07-01

    Full Text Available Los edificios industriales de la primera época de Kahn iniciaron un proceso sinérgico con los procesos de montaje, dependiendo cada vez más de la producción en cadena fordista, la cual puede homologarse, en su motricidad lineal, a la de un tren. Así, se llega a mostrar que las numerosas naves de montaje de vehículos para Ford o Packard son edificios de producción industrial y a la vez terminales de carga y descarga ferroviaria. Existió por tanto un interesante trasvase de elementos  tipológicos de las construcciones ferroviarias a la arquitectura industrial de Kahn, lo cual se analiza a través de ejemplos característicos como las terminales, las freighthouses, las trainsheds, los depots o las  enginehouses. El otro gran tipo constructivo de claro linaje ferroviario fueron los puentes metálicos norteamericanos, que a su vez fueron asimilados en las grandes estructuras de naves y hangares. Con ellos se aportaron soluciones a problemas de luces hasta entonces desconocidas, sugiriéndose un papel destacado, tanto aquí como en otros casos, en el empleo de voladizos.

  7. Sin$\\phi$ azimuthal asymmetry in semi-inclusive electroproduction on longitudinally polarized nucleon

    CERN Document Server

    Oganessian, K.A.; Bianchi, N.; Kotzinian, A.M.

    1998-01-01

    We investigate the $sin \\phi$ azimuthal asymmetry in the semi-inclusive deep-inelastic lepton scattering off longitudinally polarized nucleon target arising from the time reversal odd structures. The order 1/Q contributions of the leading twist and twist-three distribution and fragmentation functions to that asymmetry for the certain kinematical conditions are numerically estimated.

  8. Absolute Absolution: The Forgiveness of Original Sin by Ministers of Government Schooling.

    Science.gov (United States)

    Gatto, John Taylor

    1994-01-01

    Traces the evolution of public schooling as an attempt by progressives and others to absolve citizens of Original Sin and unweave the world view of traditional Christianity. Argues that the removal from schools of Christian beliefs about morality, labor, self-control, and death signals a wish to collectivize the American masses and restore a…

  9. Los edificios de las bibliotecas públicas en los programas electorales (Castilla-La Mancha, 2007-2015

    Directory of Open Access Journals (Sweden)

    José Pablo Gallo León

    2017-02-01

    Full Text Available Se analizan las propuestas sobre edificios e instalaciones de las bibliotecas presentes en los programas con que los partidos políticos participaron en las elecciones de Castilla-La Mancha durante el periodo de la crisis económica, con el fin de evaluar cómo reflejan el interés social por las mismas. A pesar de la desmaterialización digital de los servicios bibliotecarios en el actual entorno híbrido, la proyección de la biblioteca pública como un servicio a la sociedad requiere de una presencialidad física que dé soporte a su actual papel como ágora, punto de intercambio socio-intelectual y de formación de la comunidad a la que sirve. Esto debería verse traducido en un interés social por los espacios bibliotecarios que puede ser testado a través de su presencia en los programas electorales, donde se ven reflejados los temas que conforman la agenda política. Concluimos que ha habido un cambio de tendencia, priorizando la reforma y aseguramiento de la apertura de los centros frente a la construcción de nuevas bibliotecas. Igualmente, se comprueba que los programas presentan una visión muy tradicional de los servicios presenciales

  10. Las redes verticales de seguridad en la construcción de edificios. I

    Directory of Open Access Journals (Sweden)

    Maciá Mateu, Antonio

    2002-02-01

    Full Text Available In the different countries, various safety net systems were developed in the last half century to avoid accidental falls during structure building. The vertical safety net system genuine from Spain, as well as the other systems, have suffered some serious and fatal accidents, that led to improvements in their design. In the first part of his paper, the behaviour of the spanish vertical safety net system is analyzed in the light of some previous experiments and a simplified mathematical model, that allow to assess some design defects and to set up their qualitative correction. In a second part, the results of other dynamic experiments with weight fall over instrumented prototypes and the conclusions of another more complex and adjusted numerical model will be focused.Para la prevención de caídas al vacío con riesgo de heridas graves o muerte durante la construcción de edificios, en los distintos países se desarrollaron durante la mitad del S XX diversos sistemas de redes de seguridad. En el sistema de redes verticales, genuino y prácticamente exclusivo de España, se han registrado, al igual que en el resto de sistemas, varios accidentes graves y mortales que han conducido a mejoras en ellos. En la primera parte de este artículo se analiza el funcionamiento del sistema español de redes verticales a la luz de algunos ensayos previos y de un modelo matemático simplificado, que permiten apreciar algunos defectos de diseño y establecer su corrección cualitativa. En una segunda parte se expondrán los resultados de otra serie de ensayos dinámicos con lanzamiento de lastre sobre prototipos instrumentados y las conclusiones de un modelo numérico más complejo y ajustado a la realidad.

  11. Haploinsufficiency of MeCP2-interacting transcriptional co-repressor SIN3A causes mild intellectual disability by affecting the development of cortical integrity.

    Science.gov (United States)

    Witteveen, Josefine S; Willemsen, Marjolein H; Dombroski, Thaís C D; van Bakel, Nick H M; Nillesen, Willy M; van Hulten, Josephus A; Jansen, Eric J R; Verkaik, Dave; Veenstra-Knol, Hermine E; van Ravenswaaij-Arts, Conny M A; Wassink-Ruiter, Jolien S Klein; Vincent, Marie; David, Albert; Le Caignec, Cedric; Schieving, Jolanda; Gilissen, Christian; Foulds, Nicola; Rump, Patrick; Strom, Tim; Cremer, Kirsten; Zink, Alexander M; Engels, Hartmut; de Munnik, Sonja A; Visser, Jasper E; Brunner, Han G; Martens, Gerard J M; Pfundt, Rolph; Kleefstra, Tjitske; Kolk, Sharon M

    2016-08-01

    Numerous genes are associated with neurodevelopmental disorders such as intellectual disability and autism spectrum disorder (ASD), but their dysfunction is often poorly characterized. Here we identified dominant mutations in the gene encoding the transcriptional repressor and MeCP2 interactor switch-insensitive 3 family member A (SIN3A; chromosome 15q24.2) in individuals who, in addition to mild intellectual disability and ASD, share striking features, including facial dysmorphisms, microcephaly and short stature. This phenotype is highly related to that of individuals with atypical 15q24 microdeletions, linking SIN3A to this microdeletion syndrome. Brain magnetic resonance imaging showed subtle abnormalities, including corpus callosum hypoplasia and ventriculomegaly. Intriguingly, in vivo functional knockdown of Sin3a led to reduced cortical neurogenesis, altered neuronal identity and aberrant corticocortical projections in the developing mouse brain. Together, our data establish that haploinsufficiency of SIN3A is associated with mild syndromic intellectual disability and that SIN3A can be considered to be a key transcriptional regulator of cortical brain development.

  12. 2 obras de F. J. Barba Corsini: Edificio de los Laboratorios Boehringer Sohn Ingelheim, S. A. B., en San Juan Despí, Barcelona; Cine Victoria, en Hospitalet de Llobregat

    Directory of Open Access Journals (Sweden)

    Barba Corsini, F. J.

    1967-11-01

    Full Text Available Building for the Boehringer Sohn Ingelheim, S. A. E. Laboratories, at San Juan Despí – Barcelona The semibasement houses the services, including dressing rooms, dining hall, central air conditioning, stores, and other technical services. The ground floor comprises the main entrance hall and also some of the laboratories, whilst the rest of the building is mostly devoted to the functional purpose of the firm, i. e., laboratory work. The manager's office and council chamber are located on the second floor. The external aspect of the building reflects its function and is an outstanding example of impressive simplicity. Victoria Cinema, at Hospitalet de Llobregat – Barcelona The design of the building takes specifically into account the poor features of the site, the greater cost efficiency of reinforced concrete and the saving in construction time associated with metallic construction. Hence a compound design was adopted. All the external walls are built with unfaced brick, and «Durisol» has been adopted for the ceilings. The choice of illumination and colouring give the walls a fine quality, and emphasize their plastic texture. A restful quality and an indication of its commercial purpose are the fundamental features reflected by the external aspect of the building.Edificio de los Laboratorios Boehringer Sohn Ingelheim, S. A. E., en San Juan Despí- Barcelona La planta semisótano del edificio está dedicada a servicios: vestuario, comedor, central de acondicionamiento de aire, almacenes de utillaje, y servicios técnicos en general. En la planta baja se ha dispuesto el vestíbulo principal de acceso; y tanto en el resto de esta planta como en las superiores, se desarrollan todas las funciones de laboratorios. En la planta segunda se han instalado los despachos de Dirección, Sala de Juntas, etc. La expresión arquitectónica exterior del edificio responde a su utilidad y resalta por su elegante sencillez. Cine Victoria, en Hospitalet de

  13. Influencia de los trastornos mentales y de la personalidad en el abandono de procesos en personas sin hogar

    OpenAIRE

    Salavera, Carlos

    2014-01-01

    Las personas sin hogar protagonizan un alto índice de abandonos en los procesos terapéuticos que establecen. El motivo de abandono no siempre es conocido, en esta investigación se aborda si viene mediado por los trastornos mentales o son los trastornos de personalidad los que llevan un mayor peso. Los resultados muestran a las personas sin hogar con deterioro cognitivo leve y trastornos de personalidad del grupo de problemas interpersonales y ambivalentes como los principales candidatos al ab...

  14. Is n sin θ conserved along the light path?

    Science.gov (United States)

    Noorbala, Mahdiyar; Sepehrinia, Reza

    2016-03-01

    Snell’s law states that the quantity n{sin}θ is unchanged in refraction of light passing from one medium to another. We inquire whether this is true in the general case where the speed of light varies continuously within a medium. It turns out to be an instructive exercise in application of Snell’s law and Fermat’s principle. It also provides good pedagogical problems in calculus of variations to deal with the subtleties of a variable domain of integration and inclusion of constraints. The final result of these exercises is that, contrary to an initial expectation, the answer to the question in the title is negative.

  15. Análisis de costos médicos y resultados de la cirugía coronaria sin circulación extracorpórea

    Directory of Open Access Journals (Sweden)

    Raúl A. Borracci

    2006-01-01

    Full Text Available Antecedentes Algunos estudios han sugerido que la cirugía coronaria “sin bomba” disminuiría la morbimortalidad posoperatoria y reduciría los costos al compararlos con la cirugía tradicional. Una característica regional importante para la Argentina es el alto costo de los insumos, en su mayoría importados, y el relativo bajo costo de internación, lo cual crea condiciones locales diferentes al pretender comparar la relación costo-efectividad de la cirugía sin circulación extracorpórea (CEC. Objetivos Realizar una evaluación de los costos médicos y los resultados de la cirugía coronaria sin CEC en comparación con la técnica tradicional y estimar a la vez su relación costo-eficacia. Material y métodos El análisis retrospectivo de costos se realizó a partir de una serie de 200 cirugías coronarias con CEC y sin CEC, efectuadas entre 2004 y 2005. Se empleó la técnica de microcosteo directo para determinar los costos de quirófano y se extrapoló el valor día/cama de la internación, de acuerdo con los datos suministrados por el prestador, para el caso de cirugías sin complicaciones (caso base. La influencia de las complicaciones en el costo final se estimó en forma indirecta mediante el uso de las tasas de complicaciones publicadas en ensayos clínicos controlados y su correspondiente costo incremental por evento, según modelos probabilísticos publicados previamente. Por tratarse de un modelo parcialmente estocástico, se informan sólo los costos netos con uno y otro procedimiento, a fin de obtener la diferencia o beneficio neto entre el uso de cirugía con CEC y sin CEC. Finalmente, se realizó un análisis de sensibilidad de costos por medio de una simulación dinámica computarizada (parámetros predictores: número de usos del estabilizador y tasa de uso de cirugía sin CEC. Resultados En una cirugía coronaria que evoluciona sin complicaciones, el costo se halló entre $9.340 y $12.540 (mediana = $10.750 para el

  16. Edificio del Ilustre Colegio de Registradores de la Propiedad, en Madrid, España

    Directory of Open Access Journals (Sweden)

    Azpiazu Ordóñez, J. R.

    1966-05-01

    Full Text Available This building has a basement, ground floor, seven additional floors, and an attic. The basement is occupied by the heating and air conditioning installations, the electricity meters the archive of the registrars, and houses for the doorman and porter. On the ground floor there is an information and doorman's booth, a map of Spain with the zones covered by each registrar, the hall, lifts, stairs, whilst the rest of the floor is devoted to commercial activities. The first floor belongs to the Registrars' College, and the 2nd, 3rd, 4th, 5th and 6th floors have been allocated to the offices of all the property registrars of Madrid. The 7th floor and the attic are offices, to be let to outsiders.El edificio consta de: sótano, planta baja, siete plantas de altura, y planta de ático. El sótano alberga los servicios de: calefacción y refrigeración, cuarto de contadores, archivo de legajos de Registros, viviendas del portero y conserje, etc. En la planta baja se encuentran: la cabina de información y estancia del portero, el mapa de Madrid con la demarcación de Registros, el hall de ascensores y escalera, etc.; el resto de la planta está ocupado por eventuales locales comerciales. La planta primera está destinada a sede del Ilustre Colegio de Registradores de la Propiedad; las plantas segunda, tercera, cuarta, quinta y sexta se han reservado para instalar todos los Registros de Madrid; y las plantas séptima y de ático se han destinado para oficinas de alquiler.

  17. Test of 10 GHz sin-cosin microwave reflectometer on CASTOR

    International Nuclear Information System (INIS)

    Zacek, F.; Kletecka, P.

    1994-09-01

    The first microwave reflectometric device is described used at the CASTOR tokamak to measure fast density fluctuations. The device operates at the frequency of 10.26 GHz which makes it possible to detect fluctuations near the plasma periphery. The device was proved to work properly during the whole tokamak discharge despite the fact that the reflected signal level varied strongly. The construction of the reflectometric device is described as is its use of the so-called sin-cosin detection system, and the results obtained are discussed. (Z.S.) 8 figs., 3 refs

  18. Demo 94. Campana de vacío : hinchar un globo sin soplar y cocer un huevo en el Everest

    OpenAIRE

    Garro Martínez, Núria

    2013-01-01

    Objetivo: a) Hinchar un globo sin soplar: Experimentar la relación entre el volumen y la presión de los gases. Demostrar que es posible hinchar un globo sin insuflar aire en su interior, reduciendo la presión (atmosférica). b) Cocer un huevo en el Everest: Comprobar la disminución del punto de ebullición del agua al reducir la presión (atmosférica)

  19. Classicação Sinótica de Frentes Frias Associadas a Chuvas Extremas no Leste de Santa Catarina (SC

    Directory of Open Access Journals (Sweden)

    Gustavo C.J. Escobar

    Full Text Available Resumo O trabalho apresenta uma classificação sinótica de frentes frias sobre o leste do Estado de Santa Catarina (SC, com o propósito de identificar os principais padrões sinóticos associados com chuvas extremas na região do Vale do Itajaí. A metodologia utilizada foi a técnica de Análise de Componentes Principais aplicada à série de reanálises do Climate Forecast System Reanalysis (CFSR (NCEP para o período 1979-2010. Previamente, realiza-se uma climatologia de frentes frias sobre o leste de SC, cujos resultados mostram uma maior frequência de frentes frias associadas a chuvas extremas no Vale do Itajaí durante a primavera. Os resultados fornecem cinco padrões sinóticos principais que representam 83,4% dos casos de frentes frias com chuvas extremas no Vale do Itajaí. O padrão sinótico mais frequente mostra um intenso fluxo de quadrante sudeste sobre a região de estudo, determinado pela presença de um forte anticiclone pós-frontal observado sobre o sul da Província de Buenos Aires, cuja frente fria associada encontra-se no extremo nordeste catarinense. Por último, há dois padrões sinóticos típicos de verão relacionados com chuvas extremas no Vale do Itajaí; um relacionado com episódios de Zona de Convergência do Atlântico Sul (ZCAS e outro associado com a Baixa do Chaco (BCH.

  20. JUAN SIN MIEDO VA A LA ESCUELA

    Directory of Open Access Journals (Sweden)

    Silvia Méndez-Anchía

    2009-01-01

    Full Text Available Tomando como base la lectura del cuento "Juan Sin Miedo" realizada por tres sujetos adolescentes, pretendo responder a la pregunta sobre los principales temores que enfrenta la población costarricense adolescente en la actualidad. Las respuestas giran en torno a tres núcleos significativos: el miedo a la exclusión económica y social, materializada en el trato discriminatorio hacia quienes no se adecuan a los criterios impuestos por la sociedad de consumo; el miedo a la escuela, en tanto excluye a quienes no se ajustan a la norma esperada de desempeño académico; y el miedo al otro, en particular a la calle y la escuela como espacios de violencia. Concluyo señalando que, detrás de dichos temores, es posible leer un anhelo de pertenencia; de aprecio sincero y gratuito, en que no medie el rendimiento académico de la persona; así como un anhelo de seguridad en el entorno cercano.

  1. At finde sin stemme på dansk

    DEFF Research Database (Denmark)

    Frederiksen, Karen-Margrete

    2013-01-01

    At finde sin stemme på dansk/ Finding your voice in Danish It is a general experience of foreigners in Denmark that Danes and other speakers of Danish tend to switch into English when the foreigners try to use and practice their Danish. In this article, I focus on foreign knowledge workers working...... at Danish universities and their experiences with finding their voice in Danish in an environment where English is frequently used. At CIP, Centre for Internationalisation and Parallel Language Use, we are developing a format for Danish courses aimed at foreign knowledge workers. Central to the development...... of the course is how to make it possible for the participants to practice their Danish and have a voice in Danish outside the classroom. In this article, I discuss different reasons why people switch into English when speaking with learners of Danish and the implications it may have, both for the learners...

  2. El problema del crecimiento sostenible ¿cómo crecer sin destruirse?

    Directory of Open Access Journals (Sweden)

    Jorge Saravia Rios

    2010-08-01

    Full Text Available De una u otra forma las organizaciones perciben el crecer como una meta necesaria en la planeación estratégica y cuando se logra el crecimiento buscado se supone una gestión exitosa. Sin embargo, en ocasiones no hay claridad sobre lo que significa crecer, cuáles son sus efectos y no se comprende con profundidad el significado de una buena gestión. Es común ver a las organizaciones formular preguntas como:¿Crecer significa vender más?, ¿Hasta dónde puedo crecer? ¿Crecer es tener mayor infraestructura y personal? ¿Qué tan rentable seré creciendo? o presentando afirmaciones como: “la meta del plan estratégico para este año es crecer un 20%, eso nos posicionará como el número uno en el sector”. La meta de una organización debe ser: ser sostenible y el crecer, puede ser una estrategia para lograrla, sin embargo, el crecer por sí mismo no necesariamente genera sostenibilidad, por esto, si una organización lo entiende como su meta puede comprometer su viabilidad. El problema del crecimiento tiene varias dimensiones de análisis que involucran todas las instancias de una organización, por ejemplo, se necesita tener acceso a la información del mercado y el entorno, se necesita tener la inteligencia para comprender esta información, se necesita una estructura organizacional dinámica, flexible e innovadora, es necesario comprender cómo los diferentes procesos interactúan y qué recursos necesitan. Para entender el crecer como una estrategia, se hace necesaria su formalización, y el uso de herramientas que permitan su manejo, estas herramientas deberán incluir las diferentes dimensiones de análisis. Mediante el uso de estos modelos, una organización puede diseñar una estrategia de crecimiento coherente con sus metas, y sin el riesgo de comprometer su estabilidad.

  3. Evaluación de los costos de construcción de sistemas estructurales para viviendas de baja altura y de interés social

    OpenAIRE

    Carrillo, Julián; Echeverri, Fabián; Aperador, William

    2015-01-01

    Se realizó un análisis comparativo de los costos asociados a la construcción de vivienda de baja altura, bajo costo y de interés social. El estudio incluyó tres de los sistemas estructurales más utilizados para la construcción de vivienda de baja altura en Latinoamérica, tales como el sistema tradicional de muros de mampostería confinada, muros de concreto reforzados convencionalmente con mallas electrosoldadas y muros de concreto reforzados con fibras de acero. La comparación de los costos s...

  4. A construção do teatro romano de Bracara Augusta

    OpenAIRE

    Martins, Manuela; Mar, Ricardo; Ribeiro, Jorge; Magalhães, Fernanda

    2013-01-01

    Em 1999, quando se procedia à conclusão das escavações da palestra das termas públicas romanas do Alto da Cividade, em Braga, foi encontrada uma poderosa estrutura arqueada, com contrafortes, a qual viria a ser rapidamente identificada como uma secção do muro perimetral de um teatro. Descoberto numa extensão de cerca de 15 m, o referido muro acompanhava o pendor da vertente, apresentando-se ladeado por uma rua, limitada na parte sul por um outro muro que sustentava a palestr...

  5. Una contribución al análisis de problemas de flujo compresible sin utilizacion de viscocidad artificial

    OpenAIRE

    Quintana, F.

    1994-01-01

    En este trabajo se presentan unas técnicas desarrolladas con el objeto de obtener un algoritmo para la solución de problemas de flujo compresible sin la aplicación de términos de viscosidad artificial. Esto es motivado por el hecho de que si bien la calidad de la solución obtenida mediante procedimientos conocidos es muy buena -en particular los choques y las capas límite son capturados de manera muy precisa y sin oscilaciones-, en muchas ocasiones es preciso recurrir a la pericia del usuario...

  6. Diferencias comportamentales en gallinas ponedoras con y sin el "Método Llovera" durante el período primaveral.

    OpenAIRE

    Mentzel, Rubén

    2009-01-01

    Recibido: Dic.2008 | Aceptado: Abr.2009 En trabajos anteriores se demostraron las ventajas del control de moscas en galpones de gallinas ponedoras, aplicando el “Método Llovera”. El mismo consiste en colocar gallinas de descarte en el piso, sin alimentación propia, en una cantidad correspondiente al 10% de los animales del galpón.1 De esta forma se logra disminuir la cantidad de moscas, y aumentar la producción de huevos mejorando la calidad y la rentabilidad. Un ambiente sin moscas es mu...

  7. Análisis de ciclo de vida de una nueva solución arquitectónica que mejora el rendimiento térmico de la envolvente del edificio: Fachada Natural Aljibe

    OpenAIRE

    Carabaño, R.; Bedoya, C.; Ruiz, D.

    2014-01-01

    El objetivo de este trabajo, que supone la mejora del rendimiento térmico de la envolvente del edificio, es dar a conocer los impactos ambientales asociados a una nueva solución de fachada vegetada mediante la metodología de Análisis de Ciclo de Vida con límites del sistema de la cuna a la tumba. El análisis pretende también generar información relevante de ciclo de vida como material de partida para la redacción de una futura Declaración Ambiental de Producto. La etapa de fabricación de los ...

  8. Caracterización experimental y modelización de una enfriadora de absorción de simple/doble efecto de h2o-libr con accionamiento a dos temperaturas para climatización de edificios

    OpenAIRE

    Figueredo, Gustavo Raúl

    2012-01-01

    Durante la última década se produjo un enorme crecimiento de la implantación de la climatización de edificios, motivada por el aumento de los requerimientos de confort y de productividad de la población, entre otras causas. Los equipos de climatización más difundidos se accionan mediante energía eléctrica, lo que combinado con la gran simultaneidad de la demanda de climatización y su elevado consumo, provocan puntas de demanda de electricidad que sobrecargan las redes y frecuentement...

  9. A Method for SINS Alignment with Large Initial Misalignment Angles Based on Kalman Filter with Parameters Resetting

    Directory of Open Access Journals (Sweden)

    Xixiang Liu

    2014-01-01

    Full Text Available In the initial alignment process of strapdown inertial navigation system (SINS, large initial misalignment angles always bring nonlinear problem, which causes alignment failure when the classical linear error model and standard Kalman filter are used. In this paper, the problem of large misalignment angles in SINS initial alignment is investigated, and the key reason for alignment failure is given as the state covariance from Kalman filter cannot represent the true one during the steady filtering process. According to the analysis, an alignment method for SINS based on multiresetting the state covariance matrix of Kalman filter is designed to deal with large initial misalignment angles, in which classical linear error model and standard Kalman filter are used, but the state covariance matrix should be multireset before the steady process until large misalignment angles are decreased to small ones. The performance of the proposed method is evaluated by simulation and car test, and the results indicate that the proposed method can fulfill initial alignment with large misalignment angles effectively and the alignment accuracy of the proposed method is as precise as that of alignment with small misalignment angles.

  10. Maximum Correntropy Unscented Kalman Filter for Ballistic Missile Navigation System based on SINS/CNS Deeply Integrated Mode.

    Science.gov (United States)

    Hou, Bowen; He, Zhangming; Li, Dong; Zhou, Haiyin; Wang, Jiongqi

    2018-05-27

    Strap-down inertial navigation system/celestial navigation system ( SINS/CNS) integrated navigation is a high precision navigation technique for ballistic missiles. The traditional navigation method has a divergence in the position error. A deeply integrated mode for SINS/CNS navigation system is proposed to improve the navigation accuracy of ballistic missile. The deeply integrated navigation principle is described and the observability of the navigation system is analyzed. The nonlinearity, as well as the large outliers and the Gaussian mixture noises, often exists during the actual navigation process, leading to the divergence phenomenon of the navigation filter. The new nonlinear Kalman filter on the basis of the maximum correntropy theory and unscented transformation, named the maximum correntropy unscented Kalman filter, is deduced, and the computational complexity is analyzed. The unscented transformation is used for restricting the nonlinearity of the system equation, and the maximum correntropy theory is used to deal with the non-Gaussian noises. Finally, numerical simulation illustrates the superiority of the proposed filter compared with the traditional unscented Kalman filter. The comparison results show that the large outliers and the influence of non-Gaussian noises for SINS/CNS deeply integrated navigation is significantly reduced through the proposed filter.

  11. Freedom in responsibility: on the relevance of "sin" as a hermeneutic guiding principle in bioethical decision making.

    Science.gov (United States)

    Gräb-Schmidt, Elisabeth

    2005-08-01

    This essay deals with questions of responsibility concerning technology, in particular, gene technology and the special problem of research on embryos. I raise issues concerning the extent of humans' authority to act and the limits of human freedom. In what way is that freedom given, and what kind of responsibility results from it? By discussing various concepts of human freedom in the tradition of European philosophy, as juxtaposed to the Protestant understanding of freedom, this essay discusses the restricting limits, and the obligation to take responsibility. It will turn out that the question concerning freedom cannot be answered without understanding what being human involves. From a Christian perspective, this implies that the foundational relationship between human freedom and sin will be central to an assessment of the human ability to take responsibility. By obliterating the limits of human freedom, sin jeopardizes the very essence of that freedom. The project of taking into account the sinful state of the human condition thus aims at developing a realistic picture of the authority of humans in action, even in view of the human tasks of promoting science and research.

  12. Edificio de ocio y espectáculos. Plaza de toros en Móstoles, Madrid/España

    Directory of Open Access Journals (Sweden)

    Casado, J.

    1997-02-01

    Full Text Available The traditional image of the buildings for the 'Fiesta" must be seen as a point in a long process of definition in which important changes and innovations have been assimilated. Nowadays, things that should derive in some of these changes are happening. The "Plazas" are being used for purposes so different to those which motivated their construction as being the site for concerts or different kinds of shows. What most defines the traditional building is the centrally focused definition of the seats that allows a clear vision from any point of the ”ruedo”. Introducing a scene box meant extracting this focus from the "ruedo", so the optimal location should be found. Traditionally, the public has taken an active role in the "corrida". Each one of the seats is a place to look from, but it becomes too a place to be seen. So this seemed like the natural location for the scene, that will remark this peculiar relationship between the two main parts of the building, the rows of seats and the "ruedo". Obviously, the total amount of seats should be kept, so those to be invaded by the scene were displaced to the diametrically opposite point. What we, finally, have, is a traditional "ruedo" surrounded by a crown of seats with a varying width, where a scene box is placed. This compromise between Tradition and Evolution is what we propose as a way to explore in the future evolution of the "Plazas".

    Los edificios taurinos, tal como los hemos conocido, son el resultado de un largo proceso evolutivo, en el cual han existido momentos concretos de innovación y cambio. En España vivimos ahora el que, probablemente, deba ser uno de estos momentos. Las plazas de toros llevan ya tiempo intentando abrirse a otros usos, lúdicos o culturales, en busca de una mayor rentabilidad de sus instalaciones. Hasta el momento, este proceso no ha generado modificaciones que permitan el desarrollo de las distintas funciones en las mejores condiciones posibles, sino

  13. Fiol Olivan, F. (2014. Manual de Patología y Rehabilitación de Edificios Pathology Handbook and buildings Rehabilitation.

    Directory of Open Access Journals (Sweden)

    Héctor César Escudero Castro

    2014-08-01

    Full Text Available El Manual de Patología y Rehabilitación de Edificios de Fiol (2014 es un interesante libro que trata en, once capítulos, el conjunto de lesiones, que afectan a las edificaciones de toda época. En él encontramos un método de estudio de estos deterioros, la descripción de las causas que los provocan, los comportamientos mecánicos de los daños estructurales, así como una serie de propuestas para su corrección. Todo esto siguiendo como hilo conductor el término de patología y una clasificación de elementos y materiales arquitectónicos. En sus páginas el autor presenta la diferencia conceptual entre patología y lesiones (p.13-15, desarrolla un estudio estructurado de las lesiones, clasificándolas por el orden de surgimiento y por la naturaleza del proceso que lo genera. En donde, según el orden, las lesiones pueden ser primarias o secundarias, y, según el proceso que genera la falla, las lesiones pueden ser físicas, mecánicas o químicas (p. 17 - 30.

  14. Efficient use of electric power in corporative 3M Mexico; Uso eficiente de la energia electrica en el corporativo 3M Mexico

    Energy Technology Data Exchange (ETDEWEB)

    Sanchez Perez, Alfredo; Quinones Bonilla, Antonio S. [3M Mexico, S.A. de C.V. (Mexico); Bustos Antunez, Jorge I; Reyes Arce, Manuel [Hines Interests, S.A. de C.V. (Mexico)

    2003-07-01

    It is not enough to count on with the state of the art technology for the daily operation of a building, the challenge is to be able to make a clear analysis and with attainable goals for the optimization of rational use of the electrical energy in the operation of intelligent buildings without affecting the comfort and productivity for users as well as the functionality and profitability for the owner. This went our base to carry out control strategies that helped the efficient use of the electrical energy, obtaining important savings without neglecting the operative part, of services and human within the property. It is thus, that 3M Mexico wanting to reach these purposes, conducted actions to improve the efficiency of the equipment in the following items: electric network, general lighting, air conditioning system, ventilation and extraction, hydropneumatic system, and sumps operation. [Spanish] No basta contar con la tecnologia de punta para la operacion diaria de un edificio, el reto es ser capaces de realizar un analisis claro y con metas alcanzables para la optimizacion de uso racional de la energia electrica en las operaciones de edificios inteligentes sin afectar el confort y productividad para usuarios asi como la funcionalidad y rentabilidad para el propietario. Esta fue nuestra base para llevar a cabo estrategias de control que ayudaron al uso eficiente de la energia electrica, obteniendo ahorros importantes sin descuidar la parte operativa, de servicios y humana dentro de la propiedad. Es asi, que 3M Mexico queriendo alcanzar dichos propositos, realizo acciones para mejorar la eficiencia de los equipos en los siguientes rubros: red electrica, iluminacion general, sistema de aire acondicionado, ventilacion y extraccion, sistema hidroneumatico, y operacion de carcamos.

  15. Centro Federal de Comunidad Saint Louis - EE.UU.

    Directory of Open Access Journals (Sweden)

    Hellmuth, George

    1980-04-01

    Full Text Available The Community Federal Center lies in the outskirts of the town of Saint Louis. It was conceived and designed by the project authors — in a style characteristic of them — as a suburban architectonic complex for office use. The work, standing out over an open stretch of land, has an ample base, with a volume that is neither the actual tower of the city centre nor the classic low rural construction. The building's architectonic language permits an integration, by sympathy, in the context of the neighbouring uni-family housing zone, without naturally being assimilated in them, due to the disparity of functions. It is achieved through a fracture of scaled volumes, breaking the classic coldness of the big office building, whilst at the same time thanks to its robustness, it indicates the activity housed inside.

    El Community Federal Center está emplazado en las afueras de la ciudad de Saint Louis. Fue concebido y diseñado por los autores del proyecto —en un estilo que les es característico—, como un complejo arquitectónico suburbano destinado a oficinas. La obra, que se eleva sobre un terreno despejado, es amplía de base, presentando un volumen que no es ni la torre propia del centro urbano ni la clásica construcción rural de baja altura. El lenguaje arquitectónico del edificio permite una integración, por simpatía, en el contexto de la zona de viviendas unifamiliares cercana, sin llegar, naturalmente, a asimilarse a ellas dada la disparidad de funciones. Se lleva a cabo por medio de una fractura de volúmenes, escalonados, que rompen la frialdad clásica del gran edificio de oficinas, sin dejar de indicar, por su robustez, la actividad que alberga en su interior.

  16. Selective sandstone deterioration in the cathedrals of Salamanca, Textural anisotropy as a cause

    Directory of Open Access Journals (Sweden)

    Martín Patino, María Teresa

    1994-09-01

    Full Text Available Textural sandstone anisotropy is related to the selective deterioration of such stone in buildings. The samples studied come from the Cathedrals of Salamanca. Stone fragments, cut in different directions with regard to the base supporting the ashlars in the wall, are studied by means of a binocular magnifying glass and the Scanning Electron Microscopy (SEM. This shows that the sandstone microfabric has a granular and a laminar microtexture, which correspond to different directions in the plane in question as regards the position of the ashlar. Either of these circumstances coincides with the stone surface on the outside of the building and affect its surface deterioration in a different way. The SEM images of deteriorated stone were compared with those of unaffected stone, with both types coming from differently orientated cuts as regards the position of the ashlar. In conclusion, the position given to the block of stone in the building is of importance for the preservation of the stone. The speed of ultrasound transmission measured in samples from commercial quarries confirms the textural sandstone anisotropy to a greater or lesser extent.

    La anisotropía textural de las areniscas se relaciona con la selectividad de su deterioro en los edificios. Las muestras estudiadas pertenecen a las Catedrales de Salamanca. Fragmentos de piedra, cortados en direcciones diferentes respecto a la base sobre la que se asientan los sillares en el muro, son estudiados por medio de la lupa binocular y del microscopio electrónico de barrido (SEM. De éstos se deduce que la microfábrica de las areniscas tiene una microtextura granular y otra laminar, que corresponden a direcciones diferentes del plano respecto al asiento del sillar. Una u otra de estas situaciones coincide con la superficie de la piedra expuesta al exterior en el edificio, y afectan a su deterioro superficial de forma diferente. Las capas externas en las que predomina la arcilla

  17. Radon gas inside historical buildings in the city of Cordoba; Gas {sup 222}Rn en construcciones historicas de la ciudad de Cordoba

    Energy Technology Data Exchange (ETDEWEB)

    Perez, R; Germanier, A; Rubio, M [CEPROCOR, Cordoba (Argentina); Sbarato, D; Zappino, R [Observatorio Ambiental de la Municipalidad de Cordoba, Cordoba (Argentina)

    1998-07-01

    de radon 222. El principal aporte se encontro en los muros de las habitaciones lo que indica que los materiales de construccion locales representan una importante fuente de radon 222. Dentro de los materiales de construccion empleados en estos edificios se encuentan principalmente rocas graniticas y en menor medida cal, arena y marmol. Las concentraciones de radon 222 registradas en algunas habitaciones analizadas estan alrededor de 158 Bq/m{sup 3}. El estudio de los efectos de la ventilacion en la concentracion de radon 222 permiten concluir que sus valores disminuyen mediante una ventilacion natural eficiente de las habitaciones. (autor)

  18. La restauración del convento de Santa Teresa en Avila, España

    Directory of Open Access Journals (Sweden)

    de la Quintana Gordon, José Luis

    1989-10-01

    Full Text Available The Convent of Santa Teresa, Avila's third National Monument, has been in restoration since 1982. Its previous state was not good due to the unfavourable physical conditions of the site, to some un fortunate interventions suffered by its structure and to prolonged lack of use of many of its rooms. This paper describes the works of restoration of the building, which have been made applying contemporary intervention concepts but bearing in mind the modesty and firmness of style of Barefoot Carmelitans construction

    A partir de 1982, se desarrolló la restauración del Convento de Santa Teresa, tercer Monumento Nacional de la ciudad de Avila, en muy mal estado de conservación a causa de las desfavorables condiciones físicas de su emplazamiento, de algunas obras desafortunadas sufridas por sus estructuras y a la prolongada falta de uso de muchas de sus dependencias. Las páginas siguientes repasan los recientes trabajos de rehabilitación del edificio, en los cuales se aceptó el reto de aplicar criterios contemporáneos de intervención, sin alejarse del espíritu severo, sencillo y sólido propios de los edificios de la Regla Reformada

  19. Restauración de la iluminación natural

    Directory of Open Access Journals (Sweden)

    de Luxán García de Diego, Margarita

    1989-02-01

    Full Text Available This article tackles the problem of the distorsion of spatial values in buildings brought about by altering original natural illumination. This phenomenon is on the increase do to the installation of artificial electrical lighting in structures that were planned and built before these systems came into use. Said lighting systems attempt to substitute solar light but fail to respect the atmosphere created by natural light in these structures. The article looks at three buildings which are representative of Spanish architecture: the Prado Museum in Madrid, the Monastery of El Escorial and Córdoba's "Mezquita" (Mosque.

    Este comentario aborda el problema de la desvirtuación de los valores espaciales que se plantea en los edificios al alterar las condiciones de la iluminación natural originales. Señala su incidencia creciente a partir de la instalación, en arquitecturas que habían sido construidas con anterioridad al uso de estos sistemas, de iluminaciones artificiales eléctricas que intentan sustituir a la luz solar sin respetar los efectos ambientales creados por ella. Toma como ejemplo tres edificios arquetípicos en la Arquitectura española: el Museo del Prado de Madrid, el Monasterio de El Escorial y la Mezquita de Córdoba.

  20. Maximum Correntropy Unscented Kalman Filter for Ballistic Missile Navigation System based on SINS/CNS Deeply Integrated Mode

    Directory of Open Access Journals (Sweden)

    Bowen Hou

    2018-05-01

    Full Text Available Strap-down inertial navigation system/celestial navigation system ( SINS/CNS integrated navigation is a high precision navigation technique for ballistic missiles. The traditional navigation method has a divergence in the position error. A deeply integrated mode for SINS/CNS navigation system is proposed to improve the navigation accuracy of ballistic missile. The deeply integrated navigation principle is described and the observability of the navigation system is analyzed. The nonlinearity, as well as the large outliers and the Gaussian mixture noises, often exists during the actual navigation process, leading to the divergence phenomenon of the navigation filter. The new nonlinear Kalman filter on the basis of the maximum correntropy theory and unscented transformation, named the maximum correntropy unscented Kalman filter, is deduced, and the computational complexity is analyzed. The unscented transformation is used for restricting the nonlinearity of the system equation, and the maximum correntropy theory is used to deal with the non-Gaussian noises. Finally, numerical simulation illustrates the superiority of the proposed filter compared with the traditional unscented Kalman filter. The comparison results show that the large outliers and the influence of non-Gaussian noises for SINS/CNS deeply integrated navigation is significantly reduced through the proposed filter.

  1. Deterioro de las cerámicas y vidrieras del edificio del Ayuntamiento de San Sebastián

    Directory of Open Access Journals (Sweden)

    Alava, J. I.

    1998-12-01

    Full Text Available The ornamental ceramics and stained-glass windows of the City Hall building of San Sebastian have been studied. This building is a national monument which has been restored recently. It has been studied the origin of the observed high deterioration degree of the superficial enamel of these ceramics. We have concluded that the deterioration has a physicochemical origin. The biological origin has been excluded because of the high concentration of heavy metals leached from the enamel which avoid the growth of microorganisms. It has also been observed an increase of some elements and the loss of another ones in the first µm of depth.

    Se ha estudiado las cerámicas y las vidrieras que sirven de adorno al edificio del Ayuntamiento de San Sebastián, considerado monumento nacional, y que ha sido objeto de una reciente restauración. Se ha observado que las cerámicas presentan un alto grado de deterioro de la capa de esmalte superficial, y se ha estudiado el posible origen de este deterioro. Se concluye que el deterioro es de origen fisicoquímico, no pudiendo este ser de origen biológico debido a las elevadas concentraciones de metales pesados que lixivian de dicho esmalte y que impiden el crecimiento de microorganismos. Se ha observado asimismo que las vidrieras presentan un aumento de ciertos elementos y pérdida de otros en los primeros µm de profundidad.

  2. Avaliação da reprodutibilidade interobservadores de uma nova escala para orientação da conduta terapêutica nas metástases vertebrais: escore SINS (Spine Instability Neoplastic Score Evaluación de la reproducibilidad interobservador de una nueva escala para la orientación de la conducta terapêutica de las metástasis vertebrales: puntuación SINS Assessment of interobserver reproducibility of a new scale for management guidance in spinal metastasis: SINS score

    Directory of Open Access Journals (Sweden)

    Hugo José Sousa Sales da Silva

    2012-12-01

    Full Text Available OBJETIVO: Avaliar o impacto na conduta e quantificar a reprodutibilidade interobservador do escore SINS. Além disso, determinar sua aplicabilidade em nosso meio. MÉTODOS: Compilou-se uma apresentação com 20 casos de lesões secundárias da coluna, que foi analisada por 10 observadores. Estes definiram a estabilidade de cada lesão e, após a apresentação do sistema SINS, os mesmos casos foram apresentados aos mesmos observadores para que novamente determinassem a estabilidade da lesão. Os dados colhidos foram analisados por meio do cálculo do Kappa de Fleiss e da correlação intraclasse. RESULTADOS: Obtivemos concordância moderada interobservador com o uso do escore SINS. CONCLUSÕES: O sistema é aplicável em nosso meio. Houve mudança de opinião quanto à estabilidade da lesão após a apresentação do escore aos observadores.OBJETIVO: Evaluar el impacto en la conducta y cuantificar la reproducibilidad interobservador de la escala SINS. Además de eso, determinar la aplicabilidad de la clasificación en nuestro medio. MÉTODOS: Se compiló una presentación de 20 casos de lesiones secundarias de la columna vertebral que fue examinada por 10 observadores. Estos definieron la estabilidad de cada lesión y después de la presentación de la puntuación SINS, los mismos casos fueron presentados a los mismos observadores para que de nuevo determinasen la estabilidad de la lesión. Los datos obtenidos fueron analizados mediante el cálculo de Kappa de Fleiss y de la correlación intraclasse. RESULTADOS: Obtuvimos concordancia moderada interobservador con el uso de la puntuación SINS. CONCLUSIONES: La puntuación es aplicable en nuestro medio. Hubo un cambio de opinión en cuanto a la estabilidad de la lesión después de la presentación de la puntuación a los observadores.OBJECTIVE: To evaluate the impact on the management and quantify the inter-observer reproducibility of SINS Score. Also, determine its applicability to our milieu

  3. Measurement of $sin2\\beta$ from $B^{0}_{d} \\rightarrow J/\\Psi K^{0}_{S}$ with the LHCb detector

    CERN Document Server

    Mangiafave, N; Calvi, M; Matteuzzi, C

    2008-01-01

    The LHCb experiment will study CP violation and rare B meson decays at the LHC accelerator, in the CERN laboratories of Geneva. The CP violation in the $b$ quark mesons was observed for the first time measuring the $\\sin2\\beta$ parameter. In the first year of data taking at LHCb the $\\sin2\\beta$ measurement will be performed in the channel $B_d ^0 \\rightarrow J/\\psi K_S ^0$ (called golden channel). The comparison with results obtained in previous experiments will show possible systematic errors. Once the systematic errors will be understood, the possible discrepancies with the expected results will be the sign of a new physics beyond the Standard Model. $\\sin2\\beta$ is extracted from the asymmetry in the decay $B_d ^0 \\rightarrow J/\\psi(\\mu^+\\mu^-) K_S ^0 (\\pi^+\\pi^-)$ and its CP conjugated $\\overline{B}_d ^0 \\rightarrow J/\\psi(\\mu^-\\mu^+) K_S ^0(\\pi^-\\pi^+)$. To distinguish between $B_d ^0$ and $\\overline{B}_d$ flavour tagging algorithms are used. These introduce an additional parameter: the wrong tag fracti...

  4. Graffiti mochicas en la huaca Cao Viejo, Complejo El Brujo

    Directory of Open Access Journals (Sweden)

    2001-01-01

    Full Text Available GRAFFITI MOCHICA DE LA HUACA CAO VIEJO, COMPLEXE ARCHÉOLOGIQUE DU BRUJO. Sur des murs et colonnes de quatre des sept édifices superposés (E, D, B, A qui forment la huaca Cao Viejo, nous avons identifié des graffitis qui représentent une grande variété de dessins. Nous analysons actuellement leur élaboration, les techniques employées, leur mise en relation, leur chronologie relative, et leur présence dans d’autres sites monumentaux de la côte péruvienne. En las superficies de muros y columnas de cuatro de los siete edificios superpuestos (E, D, B, A que forman la Huaca Cao Viejo, se han identificado graffiti en una amplia variedad de diseños. Se discute el propósito de su elaboración, la técnica, asociaciones, cronología relativa, y su recurrencia en otros sitios monumentales de la costa peruana. MOCHICA GRAFFITI IN HUACA CAO VIEJO, EL BRUJO COMPLEX. On the surfaces and columns of four among seven superimposed phases (E,D,B,A that form the Huaca Cao Viejo, graffiti representing a great variety of designs were discovered. We discuss their relevance, their significance, the techniques used in creating them, their relative chronology, and their use in other monumental buildings on the northern Peruvian coast.

  5. Tres soluciones en la restauración del Palacio de Toral de los Guzmanes. León-España

    Directory of Open Access Journals (Sweden)

    Algorri García, Eloy

    1994-12-01

    Full Text Available The Palacio de Toral de los Guzmanes is a building whose walls are mostly made of "tapia" (rammed earth. One of the basic objectives of the restoration which began in 1985 is acquiring new information in order to extend the knowledge of this type of masonry, commonly used in Spanish monumental architecture. After a few general considerations the author establishes an abbreviated decalogue of construction and strength behaviour of the "tapia". The example used as an illustration is that of the description and analysis for three solutions to specific problems which appeared during the restoration works.

    El Palacio de Toral de los Guzmanes es un edificio cuyos muros están predominantemente construidos con fábrica de tapia. Uno de los objetivos básicos de la restauración, que viene realizándose desde 1985, es el progreso en el conocimiento de esta fábrica tan común en la arquitectura monumental española. Tras unas reflexiones de índole general, el autor establece un decálogo abreviado del comportamiento constructivo y resistente de la tapia y lo ejemplifica con la descripción y el análisis de tres soluciones a problemas específicos que se han experimentado en el curso de las obras.

  6. Láser escáner y nubes de puntos. Un horizonte aplicado al análisis arqueológico de edificios

    Directory of Open Access Journals (Sweden)

    García-Gómez, Ismael

    2011-12-01

    Full Text Available This paper analyses the laser scanner, a powerful tool for graphic recording of cultural heritage sites. Although attention will be drawn to those technical and logistical aspects and methods related to its employment, this report will mainly focus on its applicability on Building Archaeology, highlighting those diagnosing capacities which may help the stratigrapher to establish an evolutionary sequence of the building. The basis of this study is our work on San Miguel church in Vitoria-Gasteiz.En el siguiente artículo analizamos uno de los más modernos instrumentos de documentación gráfica del patrimonio, el láser escáner. Aunque profundizaremos en todos aquellos aspectos técnicos, logísticos y de método relativos a su empleo, nos centraremos en su efectiva aplicabilidad dentro del campo de la Arqueología de la Arquitectura, incidiendo en aquellas capacidades diagnósticas que pueden ayudar al estratígrafo a determinar la secuencia evolutiva de un edificio. Tomaremos como base nuestra experiencia en la iglesia de San Miguel de Vitoria-Gasteiz.

  7. An SINS/GNSS Ground Vehicle Gravimetry Test Based on SGA-WZ02

    Directory of Open Access Journals (Sweden)

    Ruihang Yu

    2015-09-01

    Full Text Available In March 2015, a ground vehicle gravimetry test was implemented in eastern Changsha to assess the repeatability and accuracy of ground vehicle SINS/GNSS gravimeter—SGA-WZ02. The gravity system developed by NUDT consisted of a Strapdown Inertial Navigation System (SINS, a Global Navigation Satellite System (GNSS remote station on test vehicle, a GNSS static master station on the ground, and a data logging subsystem. A south-north profile of 35 km along the highway in eastern Changsha was chosen and four repeated available measure lines were obtained. The average speed of a vehicle is 40 km/h. To assess the external ground gravity disturbances, precise ground gravity data was built by CG-5 precise gravimeter as the reference. Under relative smooth conditions, internal accuracy among repeated lines shows an average agreement at the level of 1.86 mGal for half wavelengths about 1.1 km, and 1.22 mGal for 1.7 km. The root-mean-square (RMS of difference between calculated gravity data and reference data is about 2.27 mGal/1.1 km, and 1.74 mGal/1.7 km. Not all of the noises caused by vehicle itself and experiments environments were eliminated in the primary results. By means of selecting reasonable filters and improving the GNSS observation conditions, further developments in ground vehicle gravimetry are promising.

  8. SinCHet: a MATLAB toolbox for single cell heterogeneity analysis in cancer.

    Science.gov (United States)

    Li, Jiannong; Smalley, Inna; Schell, Michael J; Smalley, Keiran S M; Chen, Y Ann

    2017-09-15

    Single-cell technologies allow characterization of transcriptomes and epigenomes for individual cells under different conditions and provide unprecedented resolution for researchers to investigate cellular heterogeneity in cancer. The SinCHet ( gle ell erogeneity) toolbox is developed in MATLAB and has a graphical user interface (GUI) for visualization and user interaction. It analyzes both continuous (e.g. mRNA expression) and binary omics data (e.g. discretized methylation data). The toolbox does not only quantify cellular heterogeneity using S hannon P rofile (SP) at different clonal resolutions but also detects heterogeneity differences using a D statistic between two populations. It is defined as the area under the P rofile of S hannon D ifference (PSD). This flexible tool provides a default clonal resolution using the change point of PSD detected by multivariate adaptive regression splines model; it also allows user-defined clonal resolutions for further investigation. This tool provides insights into emerging or disappearing clones between conditions, and enables the prioritization of biomarkers for follow-up experiments based on heterogeneity or marker differences between and/or within cell populations. The SinCHet software is freely available for non-profit academic use. The source code, example datasets, and the compiled package are available at http://labpages2.moffitt.org/chen/software/ . ann.chen@moffitt.org. Supplementary data are available at Bioinformatics online. © The Author(s) 2017. Published by Oxford University Press.

  9. EFECTO DE LA DENSIDAD DE PLANTACIÓN EN SANDÍA SIN SEMILLA INJERTADA SOBRE BULE (Lagenaria siceraria (Molina Standl.

    Directory of Open Access Journals (Sweden)

    Jesus Lopez Elias

    2010-11-01

    Full Text Available En los últimos años se ha incrementado el interés en sandía injertada sobre portainjertos tolerantes a Fusarium. En virtud de que la densidad de plantación es un factor determinante en el grado de competencia entre las plantas y de que el rendimiento por planta disminuye a medida que la densidad por unidad de superficie se incrementa, el objetivo de este estudio fue evaluar el efecto de tres densidades de plantación, en hileras a 2.0 m de separación con plantas espaciadas a 1.25, 1.55 y 2.00 m, sobre la producción y calidad de sandía sin semilla híbrido ‘Tri-X 313’, injertada sobre bule (Lagenaria siceraria (Molina Standl. híbrido ‘Emphasis’. El experimento se desarrolló utilizando un diseño en bloques completos al azar, con cuatro repeticiones. Las densidades de plantación evaluadas no influyeron sobre la producción de sandía sin semilla, híbrido ‘Tri-X 313’, injertada sobre L. siceraria; Sin embargo, las plantas injertadas mostraron una disminución del rendimiento por superficie con respecto de aquellas sin injertar, que varió del 10 al 24%, por lo que su uso está restingido a suelos con problemas de estrés causado principalmente por enfermedades. El peso promedio del fruto se incrementó en un 10% con el espaciamiento a 2.00 m. Asimismo, el número de frutos por planta disminuyó significativamente a medida que la densidad se incrementó. Los resultados en sandía injertada no fueron positivos por unidad de superficie; sin embargo, se obtuvo mayor producción por planta a menor densidad de plantación (mayor espaciamiento. Dado el incremento en los costos de producción al utilizar plantas injertadas, existe ventaja en el uso de menor densidad de plantación (mayor espaciamiento, pudiendose usar hasta un 50% menos densidad de plantación que en sandía sin injertar, sin afectar significativamente la producción y la

  10. Máximos y mínimos sin cálculo aplicado a la economía

    Directory of Open Access Journals (Sweden)

    Luis Miguel Cabrera G.

    2015-04-01

    Full Text Available RESUMEN El articulo muestra los problemas más sencillos “Máximos y Mínimos sin Cálculo”. Este tipo de problemas se presentan en ingeniería, la industria, la administración y la vida cotidiana, con una característica en común, no obstante sus diferencias. Esta característica, consiste en determinar la forma  de lograr un efecto óptimo mediante la selección de una entre varias posibilidades. Estos problemas se resuelve por medio de métodos  de cálculo diferencial, pero solo pueden ser calculados únicamente, con la ayuda del álgebra elemental. Este es, precisamente el contenido del artículo, que propone métodos más sencillos, sin la aplicación del cálculo diferencial.

  11. Funciones de vulnerabilidad calculadas para edificaciones en muros de hormigón reforzado Calculated seismic vulnerability functions for building in walls of reinforced concrete

    Directory of Open Access Journals (Sweden)

    Esperanza Maldonado Rondón

    2010-04-01

    Full Text Available En este documento se presenta una metodología que valora el nivel de daño que pueden alcanzar las edificaciones correspondientes al sistema estructural de muros de hormigón reforzado. El modelo estima un índice de vulnerabilidad calculado en función de las características de la estructura que más influyen en su comportamiento sísmico, y lo relaciona con un índice de daño, que a su vez depende de la acción del movimiento sísmico. El modelo estima diferentes grados de vulnerabilidad, y por consiguiente, define distintos niveles de daño ante una misma acción. La relación de la vulnerabilidad con el daño se materializa mediante una forma continua con las funciones de vulnerabilidad. El modelo se construyó sobre una muestra de edificaciones reales e hipotéticas las cuales representan las características más relevantes de las edificaciones de este tipo en el medio colombiano.This document contains a methodology to assess the level of damage that buildings with reinforced concrete wall structural system may reach. The model estimates a vulnerability rate calculated in function of structure characteristics that most influent a seismic behaviour, and relates this value to a damage rate, which, in turn, depends on the action of seismic movements. The model estimates different levels of vulnerability and, consequently, defines different damages produced the same action. The vulnerability / damage ratio is materialized to vulnerability function in a continuous manner. The model was constructed on a sample of real and hypothetical buildings representing the most relevant characteristics of this type of buildings in Colombia.

  12. Los procesos de exclusión social de las personas sin hogar en la ciudad de Barcelona

    Directory of Open Access Journals (Sweden)

    María Virginia Matulic-Domandzic

    2013-12-01

    Full Text Available En este artículo se abordan los procesos de exclusión social de las personas sin hogar en la ciudad de Barcelona a través de tres apartados. En primer lugar se realiza una aproximación a los procesos de exclusión social presentes en las sociedades europeas, seguidamente se centra la mirada en la dimensión conceptual de las personas sin hogar y en sus principales causas, para finalizar con unas conclusiones en donde se sintetizan los temas planteados, así como los retos de futuro que se presentan en este fenémeno. El contenido del artículo forma parte del trabajo de investigación que se está realizando sobre los procesos de inclusión de las personas sin hogar en Barcelona. Dicha investigación está vinculada al Doctorado "Educación y sociedad" de la Universidad de Barcelona, a través del Departamento de Trabajo Social y Servicios Sociales. El incremento del fenómeno del sinhogarismo responde a procesos macrosociales que han caracterizado a las sociedades posfordistas de las últimas décadas donde la fragilidad de las redes de apoyo y de los sistemas de proteción social tienen una importancia crucial.

  13. Regulación del ciclo vesicular sináptico por las quinasas dependientes de GMPc en neuronas grabulares de cerebelo

    OpenAIRE

    Collado Alsina, Marina Andrea

    2016-01-01

    La comunicación entre las neuronas ocurre en regiones anatómicamente identificables denominadas sinapsis. Existen dos tipos de transmisión sináptica, las sinapsis químicas y las eléctricas, aunque predominan las sinapsis químicas. En este tipo de sinapsis, la comunicación neuronal ocurre en zonas especializadas de los axones, denominados terminales sinápticos, los cuales almacenan en su interior pequeñas vesículas que contienen un neurotransmisor. Ante la llegada de un potencial de acción al ...

  14. Protection of structures and buildings against the effect of electrical storms: basic concepts, evolution and application in Mexico; Proteccion contra el efecto de las tormentas electricas de estructuras y edificios: conceptos basicos, evolucion y aplicacion en Mexico

    Energy Technology Data Exchange (ETDEWEB)

    Galvan Diego, Arturo; Velazquez Sanchez, Raul [Instituto de Investigaciones Electricas, Cuernavaca, Morelos (Mexico)

    2001-07-01

    observacion cientifica, ha demostrado su eficacia en la modernizacion de cientos de procesos industriales, comerciales, de comunicacion y de servicios, asi como de los materiales y metodologias utilizadas para la proteccion de diversos equipos y procesos; desde la proteccion en sistema y equipos en alta tension hasta sistemas que manejan muy baja energia, entre los que incluyen electronicos y digitales. Sin embargo, existen leyes fundamentales como la ley de Ohm, la ley de gravedad o la ley universal de gases que, pese a que fueron descubiertos hace muchos anos, siguen vigentes y su validez proporciona elementos invaluables para el desarrollo de nuevos metodos, procesos y desarrollos tecnologicos. Uno de los casos mas relevantes que amalgama la aplicacion de criterios fundamentales y el desarrollo de nuevas tecnologias y su aplicacion en los llamados dispositivos de proteccion no convencionales lo constituye la proteccion contra el efecto de las tormentas electricas en edificios y estructuras. La aplicacion de estos dispositivos en el ambito mundial ha generado escepticismo de una gran parte de la comunidad cientifica, reacciones diversas entre los usuarios y un postura firme por parte de los fabricantes para que dichas tecnologias sean incluidas en normas internacionales. El objetivo de este articulo es ofrecer al lector la informacion basica sobre los inicios de la proteccion, la evolucion que los metodos de proteccion contra las tormentas electricas han tenido desde el siglo XVIII, la aplicacion de los criterios fundamentales de proteccion en estructuras o edificios modernos y su contenido, asi como la situacion que prevalece actualmente en los comites de las diversas organizaciones normativas nacionales e internacionales en lo referente a la inclusion de las nuevas tecnologias en las guias de diseno.

  15. «El castigo sin venganza», a la conquista del repertorio

    OpenAIRE

    Mancebo Salvador, Yolanda

    2018-01-01

    El artículo da cuenta de todos los montajes de El castigo sin venganza de Lope de Vega, desde su estreno en 1632 hasta 2014, tanto en España como en el extranjero. Se recogen las representaciones de la pieza en el ámbito profesional y en el escolar, con especial atención a los espectáculos de las escuelas de arte escénico (ESAD) y de las universidades. Se analizan los signos que intervinieron en las más destacadas puestas en escena desde el reparto a la escenografía, vestuario, música, versió...

  16. Influencia de los trastornos mentales y de la personalidad en el abandono de procesos en personas sin hogar

    Directory of Open Access Journals (Sweden)

    Carlos Salavera

    2014-01-01

    Full Text Available Las personas sin hogar protagonizan un alto índice de abandonos en los procesos terapéuticos que establecen. El motivo de abandono no siempre es conocido, en esta investigación se aborda si viene mediado por los trastornos mentales o son los trastornos de personalidad los que llevan un mayor peso. Los resultados muestran a las personas sin hogar con deterioro cognitivo leve y trastornos de personalidad del grupo de problemas interpersonales y ambivalentes como los principales candidatos al abandono de procesos de corte psicosocial. Esto implica la necesidad de tener en cuenta estos trastornos en el tratamiento y desarrollo de programas específicos de intervención.

  17. Tunable Luminescence of CeAl11O18 Based Phosphors by Replacement of (AlO)+ by (SiN)+ and Co-Doping with Eu

    NARCIS (Netherlands)

    Yin, L.J.; Chen, G.Z; Wang, C.; Xu, X.; Hao, L.Y.; Hintzen, H.T.J.M.

    2014-01-01

    A series of Si-N or Eu-Li doped CeAl11O18 and CeAl12O18N phosphors are prepared by solid–state reaction. Their structure and luminescence are researched carefully. Si-N doping with the concentration less than 8% can be successfully dissolved into CeAl11O18 crystal lattice and doesn't change the

  18. Searching for Stable SinCn Clusters: Combination of Stochastic Potential Surface Search and Pseudopotential Plane-Wave Car-Parinello Simulated Annealing Simulations

    Directory of Open Access Journals (Sweden)

    Larry W. Burggraf

    2013-07-01

    Full Text Available To find low energy SinCn structures out of hundreds to thousands of isomers we have developed a general method to search for stable isomeric structures that combines Stochastic Potential Surface Search and Pseudopotential Plane-Wave Density Functional Theory Car-Parinello Molecular Dynamics simulated annealing (PSPW-CPMD-SA. We enhanced the Sunders stochastic search method to generate random cluster structures used as seed structures for PSPW-CPMD-SA simulations. This method ensures that each SA simulation samples a different potential surface region to find the regional minimum structure. By iterations of this automated, parallel process on a high performance computer we located hundreds to more than a thousand stable isomers for each SinCn cluster. Among these, five to 10 of the lowest energy isomers were further optimized using B3LYP/cc-pVTZ method. We applied this method to SinCn (n = 4–12 clusters and found the lowest energy structures, most not previously reported. By analyzing the bonding patterns of low energy structures of each SinCn cluster, we observed that carbon segregations tend to form condensed conjugated rings while Si connects to unsaturated bonds at the periphery of the carbon segregation as single atoms or clusters when n is small and when n is large a silicon network spans over the carbon segregation region.

  19. El Palacio sin máscara: La lectura de quien no estuvo allí.

    Directory of Open Access Journals (Sweden)

    Héctor Abad Faciolince

    2008-09-01

    Full Text Available Se trata de un análisis de la obra "El Palacio sin máscara" referido a la toma del Palacio de Justicia por parte de guerrilleros y la masacre ocurrida por parte de los militares. En la obra se retrata la realidad, se poda la información de todo ruido para dejar ver la verdad.

  20. S-I-N tunneling spectroscopy of MgB2 superconductor: evidence of two superconducting energy gaps

    International Nuclear Information System (INIS)

    Sen, Shashwati; Aswal, D.K.; Singh, Ajay; Gadkari, S.C.; Shah, K.; Gupta, S.K.; Sahni, V.C.

    2002-01-01

    The tunneling spectra of polycrystalline MgB 2 , have been recorded, at different temperatures between 29 K and T c , using planar superconductor- insulating-normal (S-I-N) tunneling spectroscopy. The planar S-I-N tunnel junctions have been fabricated by thermally evaporating Ag electrodes on MgB 2 surface. The naive layer, which forms at the surface of MgB 2 , due to atmospheric degradation, was employed as an insulating layer between Ag electrodes and MgB 2 . We have found presence of two clear superconducting energy gaps in MgB 2 . The magnitudes of these gaps at 29.5 K are 1.8 and 5.9 MeV, respectively. In the vicinity of T c , while larger energy gap obeyed BCS temperature dependence, the smaller energy gap deviated from BCS dependence. All the spectra exhibited zero-bias conductance, which decreased linearly with temperature and vanished at T c . (author)