WorldWideScience

Sample records for east project final

  1. 78 FR 26063 - Central Utah Project Completion Act; East Hobble Creek Restoration Project Final Environmental...

    Science.gov (United States)

    2013-05-03

    ...-100-00-0-0, CUPCA00] Central Utah Project Completion Act; East Hobble Creek Restoration Project Final... Creek Restoration Project. These two agencies have determined that the proposed [[Page 26064

  2. Decontamination and dismantlement of the JANUS Reactor at Argonne National Laboratory-East. Project final report

    International Nuclear Information System (INIS)

    Fellhauer, C.R.; Clark, F.R.

    1997-10-01

    The decontamination and dismantlement of the JANUS Reactor at Argonne National Laboratory-East (ANL-E) was completed in October 1997. Descriptions and evaluations of the activities performed and analyses of the results obtained during the JANUS D and D Project are provided in this Final Report. The following information is included: objective of the JANUS D and D Project; history of the JANUS Reactor facility; description of the ANL-E site and the JANUS Reactor facility; overview of the D and D activities performed; description of the project planning and engineering; description of the D and D operations; summary of the final status of the JANUS Reactor facility based upon the final survey results; description of the health and safety aspects of the project, including personnel exposure and OSHA reporting; summary of the waste minimization techniques utilized and total waste generated by the project; and summary of the final cost and schedule for the JANUS D and D Project

  3. 78 FR 11672 - Notice of Availability of the Final Environmental Impact Statement for the Alta East Wind Project...

    Science.gov (United States)

    2013-02-19

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [CACA-052537, LLCAD05000, L51010000.LVRWB11B4520.FX0000] Notice of Availability of the Final Environmental Impact Statement for the Alta East Wind Project, Kern County, CA, and Proposed Land Use Plan Amendment AGENCY: Bureau of Land Management, Interior...

  4. Iowa Hill Pumped Storage Project Investigations - Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Hanson, David [Sacramento Municipal Unitlity District, Sacramento, CA (United States)

    2016-07-01

    This Final Technical Report is a summary of the activities and outcome of the Department of Energy (DOE) Assistance Agreement DE-EE0005414 with the Sacramento Municipal Utility District (SMUD). The Assistance Agreement was created in 2012 to support investigations into the Iowa Hill Pumped-storage Project (Project), a new development that would add an additional 400 MW of capacity to SMUD’s existing 688MW Upper American River Hydroelectric Project (UARP) in the Sierra Nevada mountains east of Sacramento, California.

  5. Project Radiation protection East. Status Report, July 1997

    Energy Technology Data Exchange (ETDEWEB)

    Snihs, J.O.; Sundewall, H.; Grapengiesser, S. [STEGRA Consultants (Sweden); Bennerstedt, T. [TeknoTelje (Sweden)

    1997-12-01

    Project Radiation Protection East is a Swedish program for radiation protection work in Central and Eastern Europe. The projects are assessed, planned and performed in close cooperation with partner organizations in the East. Since 1994 radiation protection cooperation concerning the former Soviet Navy training reactors in Paldiski, Estonia, is included in the project. This report presents a summary over some 140 projects, their status, allocated funds and their distribution over countries and project areas. 12 tabs.

  6. An Overview of the EAST Project

    International Nuclear Information System (INIS)

    Songtao Wu

    2006-01-01

    The China national project of Experimental Advanced Superconducting Tokamak (EAST) has been in its final engineering phase in the Institute of Plasma Physics, the Chinese Academy of Sciences (ASIPP). The year of 2006 is the important year for the EAST project. After six years hard work, the first engineering commissioning of EAST superconducting tokamak began with vacuum pumping on 7, Feb. The first charge of one of the PF coils was made on 13, Mar. The EAST superconducting tokamak is a full superconducting tokamak with a non-circle cross-section of the vacuum vessel and active cooling plasma facing components. The scientific and the engineering missions of the EAST project are to study physics issues of the advanced steady-state tokamak operations and to establish technology basis of full superconducting tokamaks. The EAST project features both superconducting toroidal field (TF) coils and poloidal field (PF) coils, continuous working (CW) non-inductive plasma current drive and heating systems, flexible and reliable PF system design to shape and control plasmas with big elongations and triangularity, real time data collection and feedback for steady-state profile control, active cooling and changeable plasma facing components (PFC) and advanced diagnostic measurements. During the past five years, the main R (and) D mainly focused on the design, fabrication and test of 16 kA CICC (Cable-in-Conduit Conductor) and the large scale superconducting magnet has been completed. The test results shown the performances of all superconducting magnets are well acceptable. For the deadlock configuration among the main components of the superconducting tokamak, the first commissioning was taken without the vacuum vessel ducts for easily disassembling if some important problems were found. In the commissioning, the TF system was charged up to 8 kA in 5000 s and the toroidal field at the major radius of 1.7 m is 2 T, which is 60% of the designed value. The reason why the TF system

  7. East Asia basin Analysis Project

    International Nuclear Information System (INIS)

    Terman, M.J.

    1986-01-01

    The United Nations-related Committee for Coordination of Joint Prospecting for Mineral Resources in Asian Offshore Areas (CCOP), in cooperation with the International Union of Geological Sciences and Circum-Pacific Council, is implementing the East Asia Basin Analysis Project. National and regional organizations, principally members of the ASEAN Council of Petroleum, are compiling maps at a scale of 1:2 million and stratigraphic cross sections of basins, with particular initial emphasis on defining and assessing oil and gas plays and with later analytical focus on other sedimentary minerals (e.g., coal, phosphate, evaporites, and uranium). Completion is anticipated in 1988. Two major elements of the project are being contributed from other agencies. (1) Base maps. - The US Geological Survey (USGS) has partly compiled eight sheets covering east Asia that show bathymetry, shorelines, and drainage systems. One sheet also presents topography and selected cultural features. All sheets are scheduled to be completed in 1987. (2) Geotectonic maps. - The Working Group on Studies of East Asian Tectonics and Resources (SEATAR) is now completing 10 transect studies with crustal profiles and strip maps at a scale of 1:1 million. One map for each transect shows a plate tectonic interpretation. Transect coordinators or others will be encouraged to extrapolate between the strips and complete the geotectonic interpretation (on USGS bases) in 1987. The IGCP Project 220 is also compiling on (USGS bases) the tin and tungsten granites of east Asia, emphasizing geochemical data needed to identify predictive models. Other mapping will probably follow mineral-deposit modeling workshops on ophiolotic chromite and regional symposia on oceanic massive sulfide and subvolcanic gold and base metals. Completion may be possible by 1989

  8. Final design review report for K basin dose reduction project

    International Nuclear Information System (INIS)

    Blackburn, L.D.

    1996-01-01

    The strategy for reducing radiation dose originating from radionuclides absorbed in the K East Basin concrete is to raise the pool water level to provide additional shielding. This report documents a final design review for cleaning/coating basin walls and modifying other basin components where appropriate. The conclusion of this review was that the documents developed constitute an acceptable design for the Dose Reduction Project

  9. 78 FR 2685 - Central Utah Project Completion Act; East Hobble Creek Restoration Project Draft Environmental...

    Science.gov (United States)

    2013-01-14

    ... DEPARTMENT OF THE INTERIOR Office of the Secretary Central Utah Project Completion Act; East Hobble Creek Restoration Project Draft Environmental Assessment AGENCY: Office of the Assistant Secretary... assessment for the East Hobble Creek Restoration Project is available for public review and comment. The...

  10. Progress of the EAST project in China

    International Nuclear Information System (INIS)

    Wan, Y.X.; Wu, S.T.; Weng, P.D.; Li, J.G.; Gao, D.M.

    2005-01-01

    The Experimental Advanced Superconducting Tokamak (EAST) project is one of the National Mega-Projects of Science Research of China, which was approved by Chinese government in 1998. EAST is a full superconducting tokamak with an elongated plasma cross-section. The mission of the project is to widely investigate both of the physics and the technologies of advanced tokamak operations, especially the mechanism of power and particle handling for steady-state operations. The basic requirements for the EAST tokamak are full superconducting coils, suitable inductive current system, continuous working non-inductive current driven and heating systems, flexible operation scenarios, flexible J(r) and P(r) control, reliable and fast plasma positioning and shaping control, changeable plasma facing components, advanced divertor and diagnostics. Significant progress of the EAST project has been achieved during last two years. The R and D programs, mainly focused on the superconducting magnets, have processed successfully. The prototypes of main parts have been fabricated and qualified. Most of the key parts of the machine have been delivered to the assembly site. The assembly of the device has begun. It is planned to obtain the first plasma in 2005. The detail information of the testing results of superconducting magnets will be given in this paper. The assembly plan and the experimental plan will be introduced, too. (author)

  11. Decontamination and decommissioning of the Experimental Boiling Water Reactor (EBWR): Project final report, Argonne National Laboratory

    International Nuclear Information System (INIS)

    Fellhauer, C.R.; Boing, L.E.; Aldana, J.

    1997-03-01

    The Final Report for the Decontamination and Decommissioning (D ampersand D) of the Argonne National Laboratory - East (ANL-E) Experimental Boiling Water Reactor (EBWR) facility contains the descriptions and evaluations of the activities and the results of the EBWR D ampersand D project. It provides the following information: (1) An overall description of the ANL-E site and EBWR facility. (2) The history of the EBWR facility. (3) A description of the D ampersand D activities conducted during the EBWR project. (4) A summary of the final status of the facility, including the final and confirmation surveys. (5) A summary of the final cost, schedule, and personnel exposure associated with the project, including a summary of the total waste generated. This project report covers the entire EBWR D ampersand D project, from the initiation of Phase I activities to final project closeout. After the confirmation survey, the EBWR facility was released as a open-quotes Radiologically Controlled Area,close quotes noting residual elevated activity remains in inaccessible areas. However, exposure levels in accessible areas are at background levels. Personnel working in accessible areas do not need Radiation Work Permits, radiation monitors, or other radiological controls. Planned use for the containment structure is as an interim transuranic waste storage facility (after conversion)

  12. Final Project Report Project 10749-4.2.2.1 2007-2009

    Energy Technology Data Exchange (ETDEWEB)

    Zacher, Alan H.; Holladay, Johnathan E.; Frye, J. G.; Brown, Heather M.; Santosa, Daniel M.; Oberg, Aaron A.

    2009-05-11

    This is the final report for the DOE Project 10749-4.2.2.1 for the FY2007 - FY2009 period. This report is non-proprietary, and will be submitted to DOE as a final project report. The report covers activities under the DOE Project inside CRADA 269 (Project 53231) as well as project activites outside of that CRADA (Project 56662). This is the final report that is summarized from the non-proprietary quarterlies submitted to DOE over the past 2.5 years, which in turn are summaries from the proprietary technical reporting to UOP.

  13. Projections of East Asian summer monsoon change at global warming of 1.5 and 2 °C

    Science.gov (United States)

    Liu, Jiawei; Xu, Haiming; Deng, Jiechun

    2018-04-01

    Much research is needed regarding the two long-term warming targets of the 2015 Paris Agreement, i.e., 1.5 and 2 °C above pre-industrial levels, especially from a regional perspective. The East Asian summer monsoon (EASM) intensity change and associated precipitation change under both warming targets are explored in this study. The multimodel ensemble mean projections by 19 CMIP5 models show small increases in EASM intensity and general increases in summer precipitation at 1.5 and 2 °C warming, but with large multimodel standard deviations. Thus, a novel multimodel ensemble pattern regression (EPR) method is applied to give more reliable projections based on the concept of emergent constraints, which is effective at tightening the range of multimodel diversity and harmonize the changes of different variables over the EASM region. Future changes projected by using the EPR method suggest decreased precipitation over the Meiyu belt and increased precipitation over the high latitudes of East Asia and Central China, together with a considerable weakening of EASM intensity. Furthermore, reduced precipitation appears over 30-40° N of East Asia in June and over the Meiyu belt in July, with enhanced precipitation at their north and south sides. These changes in early summer are attributed to a southeastward retreat of the western North Pacific subtropical high (WNPSH) and a southward shift of the East Asian subtropical jet (EASJ), which weaken the moisture transport via southerly wind at low levels and alter vertical motions over the EASM region. In August, precipitation would increase over the high latitudes of East Asia with more moisture from the wetter area over the ocean in the east and decrease over Japan with westward extension of WNPSH. These monthly precipitation changes would finally contribute to a tripolar pattern of EASM precipitation change at 1.5 and 2 °C warming. Corrected EASM intensity exhibits a slight difference between 1.5 and 2 °C, but a

  14. Analysis of Construction Material Procurement Retardation on Sepaku-Petung Rigid Pavement Improvement Project in East Kalimantan Province

    Directory of Open Access Journals (Sweden)

    Rama Nugraha

    2017-11-01

    Full Text Available his study aims to know the factors influencing the retardation in procurement of construction materials on Sepaku-Petung pavement improvement project in East Kalimantan Province;to know the most dominant factor affecting the retardation in procurement of construction materials on Sepaku-Petung pavement improvement project in East Kalimantan Province; to determine what strategies that minimize the waiting time of materials in the improvement of Sepaku-Petung pavement project in East Kalimantan Province. This study used quantitative research method. The data was collected through interview, questionnaire distribution, and discussion forum. Based on the results of research and data analysis conducted, it can be concluded thatsuppliers, contractors, field conditions, and unpredictable conditionswere affecting the retardation in procurement of materials in the pavement improvement project in East Kalimantan. Field condition was the most dominant factors in the realization of Sepaku-Petung pavement improvement project in East Kalimantan province. Type B (Retarding Admixtures could be added to retard the time-binding of the concrete (setting time, therefore minimizing material procurement waiting time. The contractor should also build his own supplier close to the project site to reduce the distance between the concrete supplier location and the project site.

  15. Projections of East Asian summer monsoon change at global warming of 1.5 and 2 °C

    Directory of Open Access Journals (Sweden)

    J. Liu

    2018-04-01

    Full Text Available Much research is needed regarding the two long-term warming targets of the 2015 Paris Agreement, i.e., 1.5 and 2 °C above pre-industrial levels, especially from a regional perspective. The East Asian summer monsoon (EASM intensity change and associated precipitation change under both warming targets are explored in this study. The multimodel ensemble mean projections by 19 CMIP5 models show small increases in EASM intensity and general increases in summer precipitation at 1.5 and 2 °C warming, but with large multimodel standard deviations. Thus, a novel multimodel ensemble pattern regression (EPR method is applied to give more reliable projections based on the concept of emergent constraints, which is effective at tightening the range of multimodel diversity and harmonize the changes of different variables over the EASM region. Future changes projected by using the EPR method suggest decreased precipitation over the Meiyu belt and increased precipitation over the high latitudes of East Asia and Central China, together with a considerable weakening of EASM intensity. Furthermore, reduced precipitation appears over 30–40° N of East Asia in June and over the Meiyu belt in July, with enhanced precipitation at their north and south sides. These changes in early summer are attributed to a southeastward retreat of the western North Pacific subtropical high (WNPSH and a southward shift of the East Asian subtropical jet (EASJ, which weaken the moisture transport via southerly wind at low levels and alter vertical motions over the EASM region. In August, precipitation would increase over the high latitudes of East Asia with more moisture from the wetter area over the ocean in the east and decrease over Japan with westward extension of WNPSH. These monthly precipitation changes would finally contribute to a tripolar pattern of EASM precipitation change at 1.5 and 2 °C warming. Corrected EASM intensity exhibits a slight difference

  16. Projected change in East Asian summer monsoon by dynamic downscaling: Moisture budget analysis

    Science.gov (United States)

    Jung, Chun-Yong; Shin, Ho-Jeong; Jang, Chan Joo; Kim, Hyung-Jin

    2015-02-01

    The summer monsoon considerably affects water resource and natural hazards including flood and drought in East Asia, one of the world's most densely populated area. In this study, we investigate future changes in summer precipitation over East Asia induced by global warming through dynamical downscaling with the Weather Research and Forecast model. We have selected a global model from the Coupled Model Intercomparison Project Phase 5 based on an objective evaluation for East Asian summer monsoon and applied its climate change under Representative Concentration Pathway 4.5 scenario to a pseudo global warming method. Unlike the previous studies that focused on a qualitative description of projected precipitation changes over East Asia, this study tried to identify the physical causes of the precipitation changes by analyzing a local moisture budget. Projected changes in precipitation over the eastern foothills area of Tibetan Plateau including Sichuan Basin and Yangtze River displayed a contrasting pattern: a decrease in its northern area and an increase in its southern area. A local moisture budget analysis indicated the precipitation increase over the southern area can be mainly attributed to an increase in horizontal wind convergence and surface evaporation. On the other hand, the precipitation decrease over the northern area can be largely explained by horizontal advection of dry air from the northern continent and by divergent wind flow. Regional changes in future precipitation in East Asia are likely to be attributed to different mechanisms which can be better resolved by regional dynamical downscaling.

  17. Cleveland Dam East Abutment : seepage control project

    Energy Technology Data Exchange (ETDEWEB)

    Huber, F.; Siu, D. [Greater Vancouver Regional District, Burnaby, BC (Canada); Ahlfield, S.; Singh, N. [Klohn Crippen Consultants Ltd., Vancouver, BC (Canada)

    2004-09-01

    North Vancouver's 91 meter high Cleveland Dam was built in the 1950s in a deep bedrock canyon to provide a reservoir for potable water to 18 municipalities. Flow in the concrete gravity dam is controlled by a gated spillway, 2 mid-level outlets and intakes and 2 low-level outlets. This paper describes the seepage control measures that were taken at the time of construction as well as the additional measures that were taken post construction to control piezometric levels, seepage and piping and slope instability in the East Abutment. At the time of construction, a till blanket was used to cover the upstream reservoir slope for 200 meters upstream of the dam. A single line grout curtain was used through the overburden from ground surface to bedrock for a distance of 166 meters from the dam to the East Abutment. Since construction, the safety of the dam has been compromised through changes in piezometric pressure, seepage and soil loss. Klohn Crippen Consultants designed a unique seepage control measure to address the instability risk. The project involved excavating 300,000 cubic meters of soil to form a stable slope and construction bench. A vertical wall was constructed to block seepage. The existing seepage control blanket was also extended by 260 meters. The social, environmental and technical issues that were encountered during the rehabilitation project are also discussed. The blanket extension construction has met design requirements and the abutment materials that are most susceptible to internal erosion have been covered by non-erodible blanket materials such as plastic and roller-compacted concrete (RCC). The project was completed on schedule and within budget and has greatly improved the long-term stability of the dam and public safety. 2 refs., 8 figs.

  18. Gas projects surge in the Middle East as governments seek new revenue sources

    International Nuclear Information System (INIS)

    Williams, M.D.

    1997-01-01

    The rapid development of natural gas and condensate reserves in the Middle East results from a simple motivation: the desire of governments to earn revenues. For the past decade, Middle East governments have run budget deficits, which they funded by drawing down foreign assets and issuing debt. Now in the process of structural economic reform, they have begun to use an under-utilized resource--natural gas, of which Middle East governments own about one third of the world's reserves. Governments receive revenues from several sources in natural gas developments, which makes the projects very attractive. Revenue comes from the sale of the natural gas in the domestic market and, if exported, the international market; the sale of associated condensates; the additional exports of crude oil or refined products if natural gas is substituted for refined products in domestic markets; the increased sale of crude oil if natural gas is injected into reservoirs to maintain pressure; and the sale of petrochemicals where natural gas is used as feedstock. Large projects under way in the Middle East highlight the consequences of multiple revenue sources and interlinked costs of natural gas and condensate development. Other countries in the region are undertaking similar projects, so examples cited represent only a portion of what is occurring. The paper describes Abu Dhabi, Qatar, Saudi Arabia, and Iran

  19. Pac-Rim LNG project : final project report specifications

    International Nuclear Information System (INIS)

    1996-01-01

    PAC-RIM LNG Inc. has submitted a proposal to the British Columbia Environmental Assessment Office, to develop a liquefied natural gas project which would purchase pipeline quality natural gas from sources in northeast British Columbia and Alberta and transport it via a dedicated pipeline system to a LNG processing plant on tidewater on the Pacific coast. The project would include storage and processing facilities and a marine loading terminal. This document sets out the final project report specifications prepared by the Project Committee on the basis of input received from the public, First Nations and federal, provincial and local governments

  20. 76 FR 65746 - Notice of Availability of Joint Final Environmental Impact Statement/Final Environmental Impact...

    Science.gov (United States)

    2011-10-24

    ...In accordance with the National Environmental Policy Act of 1969, as amended (NEPA), and the Federal Land Policy and Management Act of 1976, as amended (FLPMA), the Bureau of Land Management (BLM) and the California Public Utilities Commission (CPUC) have prepared a Final Environmental Impact Statement (EIS) and Final Environmental Impact Report (EIR) as a joint environmental analysis document for Tule Wind, LLC's Tule Wind Project (Tule Project) and the San Diego Gas and Electric's (SDG&E) East County Substation Project (ECO Project) and by this notice are announcing the availability of the Final EIS/EIR. By this Notice the BLM is also segregating the public lands within the Tule Project application area from appropriation under the public land laws including the Mining Law, but not the Mineral Leasing or Material Sales Act, for a period of 2 years.

  1. Fiscal year 1996 decontamination and decommissioning activities photobriefing book for the Argonne National Laboratory-East Site, Technology Development Division, Waste Management Program, Decontamination and Decommissioning Projects Department

    International Nuclear Information System (INIS)

    1996-01-01

    The Photobriefing Book describes the Decontamination and Decommissioning (D and D) Program at the Argonne National Laboratory-East Site (ANL-E) near Lemont, Illinois. This book summarizes current D and D projects, reviews fiscal year (FY) 1996 accomplishments, and outlines FY 1997 goals. A section on D and D Technology Development provides insight on new technologies for D and D developed or demonstrated at ANL-E. Past projects are recapped and upcoming projects are described as Argonne works to accomplish its commitment to, ''Close the Circle on the Splitting of the Atom.'' Finally, a comprehensive review of the status and goals of the D and D Program is provided to give a snap-shot view of the program and the direction it's taking as it moves into FY 1997. The D and D projects completed to date include: Plutonium Fuel Fabrication Facility; East Area Surplus Facilities; Experimental Boiling Water Reactor; M-Wing Hot Cell Facilities; Plutonium Gloveboxes; and Fast Neutron Generator

  2. Final Project Report for Award ER65581

    Energy Technology Data Exchange (ETDEWEB)

    Stoy, Paul C. [Montana State Univ., Bozeman, MT (United States)

    2017-07-13

    The attached final project report describes contributions of Montana State University (MSU) to the project "Bridging land-surface fluxes and aerosol concentrations to triggering convective rainfall" (PI: Fuentes).

  3. Final ITER CTA project board meeting

    International Nuclear Information System (INIS)

    Vlasenkov, V.

    2003-01-01

    The final ITER CTA Project Board Meeting (PB) took place in Barcelona, Spain on 8 December 2002. The PB took notes of the comments concerning the status of the International Team and the Participants Teams, including Dr. Aymar's report 'From ITER to a FUSION Power Reactor' and the assessment of the ITER project cost estimate

  4. Prospects of natural gas demand and pipeline projects in the East Asia

    International Nuclear Information System (INIS)

    Ishii, A.

    1997-01-01

    The development of the natural gas industry in East Asia was discussed. It was predicted that by 2010, the demand for natural gas could potentially reach 80 billion cubic feet per day. This represents an 8 per cent per year growth rate from a 1995 baseline. Similarly, it was predicted that by 2010, the region's natural gas supply could potentially reach 65 billion cubic feet per day which would represent 2.5 times the supply of natural gas in 1995. The additional demand will most likely be supplied from the Middle East in the form of liquefied natural gas (LNG), from Eastern Russia through pipelines of LNG, or from North America in the form of LNG. Some gas may also be supplied from Central Asia through pipelines. The price and cost of natural gas are major uncertainties in the future of the East Asian gas demand. Pipeline projects from Russia to China were discussed. Japan and Korea are also interested in collaborating on the feasibility study with Russia and China on a 3,400 km pipeline of 60 inch diameter from the Koviktinskoye gas field through Mongolia to Beijing, Tianjin and Korea, transporting 20 to 30 billion cubic metres of gas annually. A natural gas pipeline project transporting gas from the southern edge of the Sakhalin Island to the Tokyo area was also discussed. The project would involve construction of a 2,200 km 40-48 inch pipeline, much of it undersea, transporting 6 to 12 million tonnes of liquid natural gas, annually

  5. Decontamination and decommissioning of 61 plutonium gloveboxes in D-Wing, Building 212 Argonne National Laboratory-East: Final project report

    International Nuclear Information System (INIS)

    Cheever, C.L.; Rose, R.W.

    1996-09-01

    Argonne National Laboratory-East (ANL-E) is a government-owned, contractor operated, multipurpose research facility located 25 miles southwest of downtown Chicago on 689 hectares (1,700 acres) in DuPage County, Illinois, as shown in Figure 1.1. Building 212 is located in the central area of ANL-E, as shown in Figure 1.2. The purpose of this project was to eliminate the risk of radioactive material release from the contaminated glovebox systems and to make the laboratories available for unrestricted use. The following work objectives were established: (1) Identify and remove radioactive materials for return to ANL-E Special Materials control. (2) Remove and package the radioactively contaminated materials and equipment from the gloveboxes. (3) Decontaminate the gloveboxes to nontransuranic (non-TRU) levels. (4) Size-reduce and package the gloveboxes and support systems. (5) Document and dispose of the radioactive and mixed waste. (6) Decontaminate, survey, and release the nine laboratories and corridor areas for unrestricted use

  6. CNA Maritime Asia Project. Workshop One: The Yellow and East China Seas

    Science.gov (United States)

    2012-05-01

    in 2011.8 In October, South Korean Coast Guard forces used tear gas and rubber bullets to subdue Chinese fishermen wielding clubs and shovels.9 An...tation Disputes in the East China Sea,” NBR Special Report No.35 (December 2011): 135 and 141. 39 CNA Maritime Asia Project Workshop One: The Yellow

  7. Summary of Carbon Storage Incentives and Potential Legislation: East Sub-Basin Project Task 3.1 Business and Financial Case Study

    Energy Technology Data Exchange (ETDEWEB)

    Trabucchi, Chiara [Industrial Economics, Incorporated

    2018-05-16

    The CarbonSAFE Illinois – East Sub-Basin project is conducting a pre-feasibility assessment for commercial-scale CO2 geological storage complexes. The project aims to identify sites capable of storing more than 50 million tons of industrially-sourced CO2. To support the business development assessment of the economic viability of potential sites in the East Sub-Basin and explore conditions under which a carbon capture and storage (CCS) project therein might be revenue positive, this document provides a summary of carbon storage incentives and legislation of potential relevance to the project.

  8. ROLL OUT THE TALENT : Final project report

    OpenAIRE

    Eerola, Tuomas; Tuominen, Pirjo; Hakkarainen, Riitta-Liisa; Laurikainen, Marja; Mero, Niina

    2014-01-01

    The ROLL OUT THE TALENT project was born out of the desire to recognise and support the strengths of vocational students and to develop new and innovative operating models. ROLL OUT THE TALENT promoted regional cooperation between institutes and companies. The project produced operating and study path models that take into consideration the individual strengths of vocational students and the principles of lifelong learning. This is the final report of the ROLL OUT THE TALENT project, and ...

  9. Stable isotopic composition of East African lake waters

    International Nuclear Information System (INIS)

    Odada, E.O.

    2001-01-01

    The investigation of stable isotopic composition of East African lake waters was conducted by scientists from the Department of Geology, University of Nairobi, as part of the International Decade for the East African Lakes (IDEAL) project and in close collaboration with the scientists from Large Lakes Observatory of the University of Minnesota and the Isotope Hydrology Laboratory of the IAEA in Vienna. The Research Contract was part of the IAEA Co-ordinated Research Programme on Isotope Techniques in Lake Dynamics Investigations, and was sponsored by the Agency. Water and grab sediment samples were obtained from East African Lakes during the month of January and February 1994 and July/August 1995. Water samples were analysed for oxygen and deuterium isotopic composition at the IAEA Laboratories in Vienna, Austria. In this final paper we report the results of the study of oxygen and deuterium isotopic composition from the East African lake waters. (author)

  10. Desert Peak East Enhanced Geothermal Systems (EGS) Project

    Energy Technology Data Exchange (ETDEWEB)

    Zemach, Ezra [Ormat Technologies Inc., Reno, NV (United States); Drakos, Peter [Ormat Technologies Inc., Reno, NV (United States); Spielman, Paul [Ormat Technologies Inc., Reno, NV (United States); Akerley, John [Ormat Technologies Inc., Reno, NV (United States)

    2013-09-30

    This manuscript is a draft to replaced with a final version at a later date TBD. A summary of activities pertaining to the Desert Peak EGS project including the planning and resulting stimulation activities.

  11. The fracture zone project - final report

    International Nuclear Information System (INIS)

    Andersson, Peter

    1993-09-01

    This report summarizes the work and the experiences gained during the fracture zone project at the Finnsjoen study site. The project is probably the biggest effort, so far, to characterize a major fracture zone in crystalline bedrock. The project was running between 1984-1990 involving a large number of geological, geohydrological, geochemical, and geomechanical investigation. The methods used for identification and characterization are reviewed and discussed in terms of applicability and possible improvements for future investigations. The discussion is exemplified with results from the investigation within the project. Flow and transport properties of the zone determined from hydraulic tests and tracer tests are discussed. A large number of numerical modelling efforts performed within the fracture zone project, the INTRAVAL project, and the SKB91-study are summarized and reviewed. Finally, occurrence of similar zones and the relevance of major low angle fracture zones in connection to the siting of an underground repository is addressed

  12. Project Radiation Protection East. Swedish cooperation program for radiation protection in Eastern and Central Europe. Status Report, March 1996

    International Nuclear Information System (INIS)

    Snihs, J.O.; Johansson, Mai; Grapengiesser, S.; Bennerstedt, T.

    1996-04-01

    Until now the Swedish program for radiation protection work in central and Eastern europe has been granted 55 MSEK by the Swedish government. The projects are assessed, planned and performed in close cooperation with partner organizations in the East. Since 1994, radiation protection cooperation concerning the former Soviet Navy training reactors in Paldiski, Estonia, is included in Radiation Protection East. The government has granted 8 MSEK for this purpose. This report presents a summary over some 150 projects, their status, allocated funds and their distribution over countries and project areas. The presentation is updated up to March 1996. 7 figs

  13. Advanced Air Transportation Technologies Project, Final Document Collection

    Science.gov (United States)

    Mogford, Richard H.; Wold, Sheryl (Editor)

    2008-01-01

    This CD ROM contains a compilation of the final documents of the Advanced Air Transportation Technologies (AAIT) project, which was an eight-year (1996 to 2004), $400M project managed by the Airspace Systems Program office, which was part of the Aeronautics Research Mission Directorate at NASA Headquarters. AAIT focused on developing advanced automation tools and air traffic management concepts that would help improve the efficiency of the National Airspace System, while maintaining or enhancing safety. The documents contained in the CD are final reports on AAIT tasks that serve to document the project's accomplishments over its eight-year term. Documents include information on: Advanced Air Transportation Technologies, Autonomous Operations Planner, Collaborative Arrival Planner, Distributed Air/Ground Traffic Management Concept Elements 5, 6, & 11, Direct-To, Direct-To Technology Transfer, Expedite Departure Path, En Route Data Exchange, Final Approach Spacing Tool - (Active and Passive), Multi-Center Traffic Management Advisor, Multi Center Traffic Management Advisor Technology Transfer, Surface Movement Advisor, Surface Management System, Surface Management System Technology Transfer and Traffic Flow Management Research & Development.

  14. Strategies for financing energy projects in East Central Europe

    Energy Technology Data Exchange (ETDEWEB)

    Fortino, S.E. [Texaco Inc., White Plains, NY (United States)

    1995-12-01

    This paper discusses financing options available for energy (power/steam) projects in East Central Europe. It is intended to be an overview and practical guide to such options in today`s environment. A survey is made of the principal multilateral and other financial institutions providing funding and/or credit support in the region. These include the European Bank for Reconstruction and Development, the World Bank, the International Finance Corporation, the export credit agencies, and the commercial banks. Specific guarantee and other support mechanisms which some of these institutions provide are covered, including the latest developments. In addition to loan financing, potential sources of equity financing are discussed. Next, a description of the credit rating process by such institutions as Standard and Poor`s, and an example of a successful rating effort in the Czech Republic, lead into a discussion of accessing foreign and domestic bond markets to finance energy projects in the region.

  15. 76 FR 57729 - Boundary Hydroelectric Project; Sullivan Creek Project; Notice of Availability of the Final...

    Science.gov (United States)

    2011-09-16

    ...-015] Boundary Hydroelectric Project; Sullivan Creek Project; Notice of Availability of the Final Environmental Impact Statement for the Relicensing of the Boundary Hydroelectric Project and the Surrender of... reviewed the applications for license for the Boundary Hydroelectric Project (FERC No. 2144-38), and the...

  16. Prototypical Consolidation Demonstration Project: Final report

    International Nuclear Information System (INIS)

    Gili, J.A.; Poston, V.K.

    1993-11-01

    This is the final report of the Prototypical Consolidation Demonstration Project, which was funded by the US Department of Energy's Office of Civilian Radioactive Waste Management. The project had two objectives: (a) to develop and demonstrate a prototype of production-scale equipment for the dry, horizontal consolidation and packaging of spent nuclear fuel rods from commercial boiling water reactor and pressurized water reactor fuel assemblies, and (b) to report the development and demonstration results to the US Department of Energy, Idaho Operations Office. This report summarizes the activities and conclusions of the project management contractor, EG ampersand G Idaho, Inc., and the fabrication and testing contractor, NUS Corporation (NUS). The report also presents EG ampersand G Idaho's assessments of the equipment and procedures developed by NUS

  17. Increasing Prediction the Original Final Year Project of Student Using Genetic Algorithm

    Science.gov (United States)

    Saragih, Rijois Iboy Erwin; Turnip, Mardi; Sitanggang, Delima; Aritonang, Mendarissan; Harianja, Eva

    2018-04-01

    Final year project is very important forgraduation study of a student. Unfortunately, many students are not seriouslydidtheir final projects. Many of studentsask for someone to do it for them. In this paper, an application of genetic algorithms to predict the original final year project of a studentis proposed. In the simulation, the data of the final project for the last 5 years is collected. The genetic algorithm has several operators namely population, selection, crossover, and mutation. The result suggest that genetic algorithm can do better prediction than other comparable model. Experimental results of predicting showed that 70% was more accurate than the previous researched.

  18. YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT EAST-WEST DRIFT SYSTEM SAFETY ANALYSIS

    Energy Technology Data Exchange (ETDEWEB)

    NA

    1999-06-08

    The purpose of this analysis is to systematically identify and evaluate hazards related to the design of the Yucca Mountain Project Exploratory Studies Facility (ESF) East-West Cross Drift. This analysis builds upon prior ESF System Safety Analyses and incorporates TS Main Drift scenarios, where applicable, into the East-West Drift scenarios. This System Safety Analysis (SSA) focuses on the personnel safety and health hazards associated with the engineered design of the East-West Drift. The analysis also evaluates other aspects of the East-West Drift, including purchased equipment (e.g., scientific mapping platform) or Systems/Structures/Components (SSCs) and out-of-tolerance conditions. In addition to recommending design mitigation features, the analysis identifies the potential need for procedures, training, or Job Safety Analyses (JSAs). The inclusion of this information in the SSA is intended to assist the organization(s) (e.g., constructor, Safety and Health, design) responsible for these aspects of the East-West Drift in evaluating personnel hazards and augment the information developed by these organizations. The SSA is an integral part of the systems engineering process, whereby safety is considered during planning, design, testing, and construction. A largely qualitative approach is used which incorporates operating experiences and recommendations from vendors, the constructor and the operating contractor. The risk assessment in this analysis characterizes the scenarios associated with East-West Drift SSCs in terms of relative risk and includes recommendations for mitigating all identified hazards. The priority for recommending and implementing mitigation control features is: (1) Incorporate measures to reduce risks and hazards into SSC designs. (2) Add safety features and capabilities to existing designs. (3) Develop procedures and conduct training to increase worker awareness of potential hazards, reduce exposure to hazards, and inform personnel of the

  19. 77 FR 70684 - Safety Zone; Bridge Demolition Project; Indiana Harbor Canal, East Chicago, IN

    Science.gov (United States)

    2012-11-27

    ... environmental risk to health or risk to safety that may disproportionately affect children. 10. Indian Tribal... the Cline Avenue bridge in East Chicago, IN. The Captain of the Port, Sector Lake Michigan, has determined that this demolition project will pose a significant risk to public safety and property. Such...

  20. Final Report of the Final Meeting of Project Coordinators

    International Nuclear Information System (INIS)

    Cordero Calderon, Carlos F.

    1996-06-01

    The Costa Rican Electricity Institute has always been worried of the verification of the good state of the works and thus to guarantee their operation. For that reason, it has established different sorts of auscultation of the Arenal's Dam. Some investigations have been done to find new methods to improve and to eliminate risks in different works or projects. The Arenal's Dam is one of the greatest engineering works in Costa Rica, it has the Arenal, Corobici and Sandillal Hydroelectric Plants. Furthermore, the irrigation system in the Tempisque River Valley, in the Guanacaste province. One special characteristic of the Site of the Dam, is the near location of the Arenal Volcano, in full activity and located at 6 Km. from the dam. This report has two goals, one is the traditional permanent measurements report for the project, and the other, is to present it as a final work of the Project Arcal XVIII, to the International Atomic Energy Agency. This report analyses the geo-hydraulic, structural and topographic auscultation, as well as the activities accomplished during the ARCAL XVIII /8/018, Application of Tracer Techniques for Leakage in Dams and Damming Project, based on information gathered through the geo-chemical auscultation, until June 1996. (author).30 ills., 80 charts, 35 tabs

  1. Project Rio Blanco: site restoration. Final report

    International Nuclear Information System (INIS)

    1978-01-01

    Project Rio Blanco was a joint Government-industry experiment using nuclear explosives to stimulate the flow of natural gas from low permeability formations which could not be economically produced through conventional methods. The project consisted of the simultaneous detonation of three nuclear explosives on May 17, 1973, in a 7,000 foot well in northwestern Colorado. Gas production testing and project evaluation continued through June 1976. The site cleanup and restoration planning phase began in December 1975 and was concluded with the issuance of an operational plan, Project Rio Blanco Site Cleanup and Restoration Plan, NVO-173, in May 1976. Actual site restoration activities were conducted during the period from July to November 1976. The activities throughout the restoration period are summarized and the final site status, including the disposition of all project facilities and the status of all project related wells after plug and abandonment and recompletion work are described

  2. LYNX community advocacy & service engagement (CASE) project final report.

    Science.gov (United States)

    2009-05-14

    This report is a final assessment of the Community Advocacy & Service Engagement (CASE) project, a LYNX-FTA research project designed : to study transit education and public engagement methods in Central Florida. In the Orlando area, as in other part...

  3. UNFINISHED JOURNEY Project. Final report, September 30, 1994--September 29, 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    In late 1994, the U.S. Department of Energy (Nevada Operations Office) made a $199,708 grant (through the Mathematics, Science, and Technology Education Program), to the UNFINISHED JOURNEY Project. The Project began in April, 1994, to develop and implement an innovative model of student outreach by San Jose State University (SJSU) to underserved, underrepresented student populations of the East Side Union High School District (ESUHSD). The Project was formed by a consortium involving SJSU, ESUHSD, some 20 private sector organizations (foundations/corporations), numerous local community/professional organizations, and approximately 100 private funders. This proposal to the U.S. Department of Energy was to have the Department join this unique partnership to focus University outreach to underserved student populations to pursue careers in mathematics, science, and technology.

  4. Admiralty Inlet Pilot Tidal Project Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Collar, Craig [Public Utility District No. 1 of Snohomish County, Everett, WA (United States)

    2015-09-14

    This document represents the final report for the Admiralty Inlet Pilot Tidal Project, located in Puget Sound, Washington, United States. The Project purpose was to license, permit, and install a grid-connected deep-water tidal turbine array (two turbines) to be used as a platform to gather operational and environmental data on tidal energy generation. The data could then be used to better inform the viability of commercial tidal energy generation from technical, economic, social, and environmental standpoints. This data would serve as a critical step towards the responsible advancement of commercial scale tidal energy in the United States and around the world. In late 2014, Project activities were discontinued due to escalating costs, and the DOE award was terminated in early 2015. Permitting, licensing, and engineering design activities were completed under this award. Final design, deployment, operation, and monitoring were not completed. This report discusses the results and accomplishments achieved under the subject award.

  5. British Council Project in Romania the South-East European Network of Creative Cities

    Directory of Open Access Journals (Sweden)

    Romeo Victor IONESCU

    2008-10-01

    Full Text Available A Guidebook to Creative Industries in Iasi, Romania, 2006 is a project initiated by the British Council Centre Iasi concerning “creativeindustries”. After the conferences and workshops – in Plovdiv with the regional partners, in Iasi and Bucharest with the British and the localconsultants, the team has managed to put into practice one of the key projects it set out to achieve: publishing a unified inventory of the main actorsof the industrial-creative sector in Iasi. The purpose of this project is to bring to the attention of the potential partners and supporters the city‘spotential for economic and image “re-invention”, which “unify” Iasi through its creative energies and resources and to facilitate the creation of newcreative/ profitable partnership projects – in Romania, in the UK and in South-East Europe. This guidebook is the tangible sign of the beginning ofthe journey.

  6. The role of external partners in regional cooperation projects in the Middle East

    OpenAIRE

    Raphael Bar-El; Miki Malul

    2008-01-01

    This article analyzes the extent to which external partners contribute to the internalization of externalities arising from regional cooperation in the Middle East, that is, the degree to which they help increase welfare gains generated by the projects. This is classified by extent, intensity, and sectors of cooperation. Externalities are defined macroeconomically and sociopolitically. The results show that the international community does play a role in the internalization of externalities. ...

  7. MIT LMFBR blanket research project. Final summary report

    International Nuclear Information System (INIS)

    Driscoll, M.J.

    1983-08-01

    This is a final summary report on an experimental and analytical program for the investigation of LMFBR blanket characteristics carried out at MIT in the period 1969 to 1983. During this span of time, work was carried out on a wide range of subtasks, ranging from neutronic and photonic measurements in mockups of blankets using the Blanket Test Facility at the MIT Research Reactor, to analytic/numerical investigations of blanket design and economics. The main function of this report is to serve as a resource document which will permit ready reference to the more detailed topical reports and theses issued over the years on the various aspects of project activities. In addition, one aspect of work completed during the final year of the project, on doubly-heterogeneous blanket configurations, is documented for the record

  8. Modelling projections for the risks related with atrial fibrillation in East Asia

    DEFF Research Database (Denmark)

    Bai, Ying; Guo, Shi-Dong; Shantsila, Alena

    2017-01-01

    Aims: In the Far East, there has generally been low uptake of oral anticoagulants (OACs) using vitamin K antagonists (VKA, e.g. warfarin) for stroke prevention in atrial fibrillation (AF), but OAC use has been increasing more recently, with the introduction of the non-vitamin K antagonist oral...... anticoagulants (NOACs). To explore the risks of ischaemic stroke (IS) and death related to AF in East Asia using modelling projections. Methods and results: We performed a modelling analysis of possible trends of IS and death rates in AF patients from the time period of only VKA use to current increasing trends....... There was an estimated annual risk reduction of 5484 ISs and 1128 deaths from 2016 to 2030, respectively. The AF population is estimated to reach 861 900 in 2050, with a reduction of 206 315 ISs and 139 353 deaths. Conclusion: This modelling analysis suggests that the transition from VKA to NOACs may greatly help...

  9. Canister Cleaning System Final Design Report - Project A.2.A

    International Nuclear Information System (INIS)

    FARWICK, C.C.

    2000-01-01

    Approximately 2,300 metric tons Spent Nuclear Fuel (SNF) are currently stored within two water filled pools, the 105 K East (KE) fuel storage basin and the 105 K West (KW) fuel storage basin, at the U.S. Department of Energy, Richland Operations Office (RL). The SNF Project is responsible for operation of the K Basins and for the materials within them. A subproject to the SNF Project is the Debris Removal Subproject, which is responsible for removal of empty canisters and lids from the basins. The Canister Cleaning System (CCS) is part of the Debris Removal Project. The CCS will be installed in the KW Basin and operated during the fuel removal activity. The KW Basin has approximately 3600 canisters that require removal from the basin. The CCS is being designed to ''clean'' empty fuel canisters and lids and package them for disposal to the Environmental Restoration Disposal Facility complex. The system will interface with the KW Basin and be located in the Dummy Elevator Pit

  10. U.S. LCI Database Project--Final Phase I Report

    Energy Technology Data Exchange (ETDEWEB)

    2003-08-01

    This Phase I final report reviews the process and provides a plan for the execution of subsequent phases of the database project, including recommended data development priorities and a preliminary cost estimate. The ultimate goal of the project is to develop publicly available LCI Data modules for commonly used materials, products, and processes.

  11. Regional climate projection based on RCP scenarios in the CORDEX East Asia Domain Using RegCM4

    Science.gov (United States)

    Suh, M. S.; Oh, S. G.; Cha, D. H.; Kang, H. S.

    2012-04-01

    Regional climate projection data is essential to the adaptation and risk management for the expected climate change. In this stduy, we reproduced regional climate over CORDEX East Asia for 72 years from 1979 to 2050 with 50-km resolution using the latest regional climate model version 4, RegCM4, driven by HadGEM2-AO with about 135-km resolution under Intergovernmental Panel on Climate Change (IPCC) Representative Concentration Pathway (RCP) 8.5/4.5. Simulation skills of RegCM4 for the present climate (1980-2005, spin up time: 1979) over CORDEX East Asia are evaluated with CRU-TS (Climate Research Unit Time-Series) 3.0 and GPCP (Global Precipitation Climatology Project). And KMA ground observation data are also used for the detailed assessment of RegCM4 over South Korea. The evaluation results showed that RegCM4 reasonalbly simulated the spatial distribution, and inter-annual and seasonal variations of surface air temperature. However, it showed a non-negligible systemartic biases in the precipitation. In particular, the rainband accompanied by the seasonal march of East Asian summer monsoon was simulated too southward, below 30° N comparing to the GPCP. As a reulst, summer precipitation over South Korea and Japan island was significantly underestimated. Under RCP8.5 (RCP4.5) scenario, annual mean temperature over the CORDEX East Asia is expected to increase by + 1.6 oC(+1.4oC) above the present level (1980-2005) by the end of the future simulation period. Most of the regions (South-Korea, South-China, North-China, India, Japan, Mongolia) show the increaseing trend of surface air temperature. On the other hand, the future changes of precipitation are not systemaic at the most of regions and seasons. More detailed results including projected regional climate change will be discussed in the presentation.

  12. 77 FR 38823 - Notice of Availability of the Alta East Wind Project Draft Environmental Impact Statement...

    Science.gov (United States)

    2012-06-29

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [CACA-052537, LLCAD05000, L51010000.FX0000, LVRWB11B4520] Notice of Availability of the Alta East Wind Project Draft Environmental Impact Statement/Environmental Impact Report and Proposed California Desert Conservation Area Plan Amendment, Kern County, CA...

  13. FINAL REPORT FOR THE DIII-D RADIATIVE DIVERTOR PROJECT

    International Nuclear Information System (INIS)

    O'NEIL, RC; STAMBAUGH, RD

    2002-01-01

    OAK A271 FINAL REPORT FOR THE DIII-D RADIATIVE DIVERTOR PROJECT. The Radiative Divertor Project originated in 1993 when the DIII-D Five Year Plan for the period 1994--1998 was prepared. The Project Information Sheet described the objective of the project as ''to demonstrate dispersal of divertor power by a factor of then with sufficient diagnostics and modeling to extend the results to ITER and TPX''. Key divertor components identified were: (1) Carbon-carbon and graphite armor tiles; (2) The divertor structure providing a gas baffle and cooling; and (3) The divertor cryopumps to pump fuel and impurities

  14. Final report for the 'Melt-Vessel Interactions' Project. European Union R and TD Program 4th Framework. MVI project final research report

    International Nuclear Information System (INIS)

    Sehgal, B.R.; Dinh, T.N.; Nourgaliev, R.R.; Bui, V.A.; Green, J.; Kolb, G.; Karbojian, A.; Theerthan, S.A.; Gubaidulline, A.; Bonnet, J.M.; Rouge, S.; Narcoux, M.; Liegeois, A.; Turland, B.D.; Dobson, G.P.; Siccama, A.; Ikonen, K.; Parozzi, F.; Kolev, N.; Caira, M.

    1999-04-01

    The Melt Vessel Interaction (MVI) project is concerned with the consequences of the interactions that a core melt, generated during a postulated severe accident in a light water reactor, may have with the pressure vessel. In particular, the issues concerned with the failure of the vessel bottom head are the focus of the research. The specific objectives of the project are to obtain data and develop validated models, which could be applied to prototypic plants, and accident conditions, for resolution of issues related to the melt vessel interactions. The project work has been performed by nine partners having varied responsibility. The work included a large number of experiments, with simulant materials, whose observations and results are employed, respectively, to understand the physical mechanisms and to develop validated models. Applications to the prototypic geometry and conditions have also been performed. This report is volume 1 of the Final Report for the Project, in which a summary of the progress achieved in the experimental program is provided. We have, however, included some aspects of the modeling activities. Volume 2 of the Final report describes the progress achieved in the modeling program. The progress achieved in the experimental and modeling parts of the Project has led to the resolution of some of the issues of melt vessel interaction. Considerable progress was also achieved towards resolution of the remaining issues

  15. Northeast Oregon Hatchery Project final siting report. Final report

    International Nuclear Information System (INIS)

    1995-03-01

    This report presents the results of site analysis for the Bonneville Power Administration Northeast Oregon Hatchery Project. The purpose of this project is to provide engineering services for the siting and conceptual design of hatchery facilities for the Bonneville Power Administration. The hatchery project consists of artificial production facilities for salmon and steelhead to enhance production in three adjacent tributaries to the Columbia River in northeast Oregon: the Grande Ronde, Walla Walla, and Imnaha River drainage basins. Facilities identified in the master plan include adult capture and holding facilities; spawning incubation, and early rearing facilities; full-term rearing facilities; and direct release or acclimation facilities. The evaluation includes consideration of a main production facility for one or more of the basins or several smaller satellite production facilities to be located within major subbasins. The historic and current distribution of spring and fall chinook salmon and steelhead was summarized for the Columbia River tributaries. Current and future production and release objectives were reviewed. Among the three tributaries, forty seven sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed

  16. Next Generation Attenuation Relationships for the Eastern United States (NGA-East)

    Energy Technology Data Exchange (ETDEWEB)

    Mahin, Stephen [Univ. of California, Berkeley, CA (United States); Bozorgnia, Yousef [Univ. of California, Berkeley, CA (United States)

    2016-04-11

    This is a progress report to DOE for project Next Generation Attenuation for Central & Eastern US (NGA-East).This progress report consists of numerous monthly progress segments starting June 1, 2010 until December 31, 2015. Please note: the December 2015 progress report was issued in January 2016 due to the final university financial reporting at the end of this project. For each month, there is a technical progress list, and an update on the financial progress of the project. As you know, this project is jointly funded by the DOE, US Nuclear Regulatory Commission (NRC) and Electric Power Research Institute (EPRI). Thus, each segment includes financial progress for these three funding agencies.

  17. Final Status Survey for the Largest Decommissioning Project on Earth

    International Nuclear Information System (INIS)

    Dubiel, R.W.; Miller, J.; Quayle, D.

    2006-01-01

    To assist the United States Department of Energy's (US DOE's) re-industrialization efforts at its gaseous diffusion site in Oak Ridge, Tennessee, known as the East Tennessee Technology Park (ETTP), the US DOE awarded a 6-year Decontamination and Decommissioning (D and D) contract to BNG America (formerly BNFL Inc.) in 1997. The ETTP 3-Building D and D Project included the removal and disposition of the materials and equipment from the K-33, K-31, and K-29 Gaseous Diffusion Plant buildings. The three buildings comprise more than 4.8 million square feet (446,000 square meters) of floor surface area and more than 350 million pounds (148 million kilograms) of hazardous and radioactively contaminated material, making it the largest nuclear D and D project in progress anywhere in the world. The logistical hurdles involved in a project of this scope and magnitude required an extensive amount of Engineering and Health Physics professionals. In order to accomplish the Final Status Survey (FSS) for a project of this scope, the speed and efficiency of automated survey equipment was essential. Surveys of floors, structural steel and ceilings up to 60 feet (18 meters) were required. The FSS had to be expanded to include additional remediation and surveys due to characterization surveys and assumptions regarding the nature and extent of contamination provided by the US DOE. Survey design and technical bases had to consider highly variable constituents; including uranium from depleted to low enrichment, variable levels of Technetium-99 and transuranic nuclides, which were introduced into the cascade during the 1960's when recycled uranium (RU) from Savannah River was re-enriched at the facility. The RU was transported to unexpected locations from leaks in the cascade by complex building ventilation patterns. The primary survey tool used for the post remediation and FSS was the Surface Contamination Monitor (SCM) and the associated Survey Information Management System (SIMS

  18. Tritium research laboratory cleanup and transition project final report

    International Nuclear Information System (INIS)

    Johnson, A.J.

    1997-02-01

    This Tritium Research Laboratory Cleanup and Transition Project Final Report provides a high-level summary of this project's multidimensional accomplishments. Throughout this report references are provided for in-depth information concerning the various topical areas. Project related records also offer solutions to many of the technical and or administrative challenges that such a cleanup effort requires. These documents and the experience obtained during this effort are valuable resources to the DOE, which has more than 1200 other process contaminated facilities awaiting cleanup and reapplication or demolition

  19. Biogas - Bioenergy potential in East Africa

    International Nuclear Information System (INIS)

    1997-01-01

    The workshop is part of the project: 'Energy production from Sisal Waste in East Africa' sponsored by the Danish Energy Agency, an agency under the Danish Ministry of Environment and Energy. This project has been carried out in close cooperation between the Danish Technological Institute and University of Dar es Salaam, Applied Microbiology Unit, who has also taken care of the practical arrangement. The main objectives of the workshop was: To present the ongoing research in East Africa on biogas production from organic residues; To get an overview of political and administrative issues related to promotion and implementation of renewable energy facilities in East Africa; To discuss appropriate set-ups for bioenergy facilities in East Africa. (au)

  20. Biogas - Bioenergy potential in East Africa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-12-31

    The workshop is part of the project: `Energy production from Sisal Waste in East Africa` sponsored by the Danish Energy Agency, an agency under the Danish Ministry of Environment and Energy. This project has been carried out in close cooperation between the Danish Technological Institute and University of Dar es Salaam, Applied Microbiology Unit, who has also taken care of the practical arrangement. The main objectives of the workshop was: To present the ongoing research in East Africa on biogas production from organic residues; To get an overview of political and administrative issues related to promotion and implementation of renewable energy facilities in East Africa; To discuss appropriate set-ups for bioenergy facilities in East Africa. (au)

  1. Biogas - Bioenergy potential in East Africa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-31

    The workshop is part of the project: `Energy production from Sisal Waste in East Africa` sponsored by the Danish Energy Agency, an agency under the Danish Ministry of Environment and Energy. This project has been carried out in close cooperation between the Danish Technological Institute and University of Dar es Salaam, Applied Microbiology Unit, who has also taken care of the practical arrangement. The main objectives of the workshop was: To present the ongoing research in East Africa on biogas production from organic residues; To get an overview of political and administrative issues related to promotion and implementation of renewable energy facilities in East Africa; To discuss appropriate set-ups for bioenergy facilities in East Africa. (au)

  2. Climate change projections of precipitation and reference evapotranspiration for the Middle East and Northern Africa until 2050

    NARCIS (Netherlands)

    Terink, W.; Immerzeel, W.W.; Droogers, P.

    2013-01-01

    The Middle East and North Africa (MENA) region can be considered as the most water-scarce region of the world. The Intergovernmental Panel on Climate Change projects strong changes in climate across MENA, further exacerbating pressure on available water resources. The objective of this study is to

  3. Design review report: 200 East upgrades for Project W-314, tank farm restoration and safe operations

    International Nuclear Information System (INIS)

    Boes, K.A.

    1998-01-01

    This Design Review Report (DRR) documents the contractor design verification methodology and records associated with project W-314's 200 East (200E) Upgrades design package. The DRR includes the documented comments and their respective dispositions for this design. Acceptance of the comment dispositions and closure of the review comments is indicated by the signatures of the participating reviewers. Project W-314 is a project within the Tank Waste Remediation System (TWRS) Tank Waste Retrieval Program. This project provides capital upgrades for the existing Hanford tank farm waste transfer, instrumentation, ventilation, and electrical infrastructure systems. To support established TWRS programmatic objectives, the project is organized into two distinct phases. The initial focus of the project (i.e., Phase 1) is on waste transfer system upgrades needed to support the TWRS Privatization waste feed delivery system. Phase 2 of the project will provide upgrades to support resolution of regulatory compliance issues, improve tank infrastructure reliability, and reduce overall plant operating/maintenance costs. Within Phase 1 of the W-314 project, the waste transfer system upgrades are further broken down into six major packages which align with the project's work breakdown structure. Each of these six sub-elements includes the design, procurement, and construction activities necessary to accomplish the specific tank farm upgrades contained within the package. The first design package (AN Valve Pit Upgrades) was completed in November 1997, and the associated design verification activities are documented in HNF-1893. The second design package, 200 East (200E) Upgrades, was completed in March 1998. This design package identifies modifications to existing valve pits 241-AX-B and 241-A-B, as well as several new waste transfer pipelines to be constructed within the A Farm Complex of the 200E Area. The scope of the valve pit modifications includes new pit cover blocks, valve

  4. The Middle East WMDFZ: hopes and fears

    International Nuclear Information System (INIS)

    Hautecouverture, Benjamin

    2014-05-01

    the Middle East WMDFZ project is a regional forum for dialogue, and potentially at some point in the future, negotiation. It is nonetheless imperative to call for the Helsinki Conference to take place as soon as possible for at least three reasons: firstly, to avoid continuing to hold, potentially indefinitely, the States parties to the NPT hostage to this regional security process, as has been the case since 1995. The NPT has been weakened by its inability to effectively accompany the process over the past twenty years. Next, because a new milestone must be put down in the diplomatic process, which will allow it to avoid being labelled moribund. In this regard, the EU's action, which has supported the facilitator's work since 2011 on its level, should be recognised. Finally, due to the fact that the Helsinki Conference is the guarantee of the preservation of the diplomatic channels created by the 2010 Final Document, and of the negotiations carried out away from public diplomacy since the end of 2011. The NPT framework continues to offer a stimulus to diplomatic action; it is essential not to ignore it however meagre the results may currently appear to be. (author)

  5. Future changes in the East Asian rain band projected by global atmospheric models with 20-km and 60-km grid size

    Energy Technology Data Exchange (ETDEWEB)

    Kusunoki, Shoji; Mizuta, Ryo [Meteorological Research Institute, Climate Research Department, Tsukuba, Ibaraki (Japan); Matsueda, Mio [Japan Agency for Marine-Earth Science and Technology (JAMSTEC), Tsukuba, Ibaraki (Japan)

    2011-12-15

    Global warming projection experiments were conducted using a 20-km mesh global atmospheric model, focusing on the change in the rain band of East Asian summer monsoon. To assess the uncertainty of climate change projections, we performed ensemble simulations with the 60-km resolution model combining four different SSTs and three atmospheric initial conditions. In the present-day climate simulations, the 20-km model reproduces the rain band of East Asian summer monsoon better than lower resolution models in terms of geographical distribution and seasonal march. In the future climate simulation by the 20-km model, precipitation increases over the Yangtze River valley in May through July, Korean peninsula in May, and Japan in July. The termination of rainy season over Japan tends to be delayed until August. Ensemble simulations by the 60-km model show that precipitation in the future climate for July increases over the Yangtze River valley, the East China Sea and Japan. These changes in precipitation are partly consistent with those projected by the 20-km model. Simulations by the 20-km and 60-km models consistently show that in the future climate the termination of rainy season over Japan tends to be delayed until August. The changes in the vertically integrated water vapor flux show the intensification of clockwise moisture transport over the western Pacific subtropical high. Most precipitation changes over the East Asia can be interpreted as the moisture convergence resulting from change in the horizontal transport of water vapor. (orig.)

  6. Final environmental impact statement, Beaufort Sea oil and gas development/Northstar Project. Appendix A: BP Exploration (Alaska) Inc. Final project description - Revision 1, March 27, 1997

    International Nuclear Information System (INIS)

    1999-02-01

    BP Exploration (Alaska) Inc. (BPXA) submitted a permit application to the US Army Engineer District, Alaska to initiate the review process for BPXA's plans to develop and produce oil and gas from the Northstar Unit. This report contains Appendix A of an Environmental Impact Statement which was undertaken to identify and evaluate the potential effects the proposed project may have on the environment. This document is the Northstar Development Project, Final Project Description, Revision 1 for BPXA Northstar Project

  7. The Impact of the SESAME Project on Science and Society in the Middle East

    Science.gov (United States)

    Winick, Herman

    2008-04-01

    SESAME (Synchrotron-light for Experimental Science and Applications in the Middle East) is a UNESCO-sponsored project that is constructing an international research laboratory, closely modeled on CERN, in Jordan (www.sesame.org.jo). Ten Members of the governing Council (Bahrain, Cyprus, Egypt, Iran, Iraq, Israel, Jordan, Pakistan, Palestinian Authority, and Turkey) have responsibility for the project, led by Herwig Schopper, Council President since 1999. In late 2008 Chris Llewellyn-Smith will become Council President. SESAME was initiated by a gift from Germany of the decommissioned BESSY I facility. The BESSY I 0.8 GeV injector is now being installed in the recently completed building, funded by Jordan, as components are procured for a new 133 m circumference, 2.5 GeV third-generation storage ring with 12 locations for insertion devices. Beam line equipment has been provided by laboratories in France, UK, and US. Support also comes from EU, IAEA, ICTP, Japan Society for the Promotion of Science, the US Department of Energy and State Department, and laboratories around the world. The broad scientific program includes biomedical, environmental, and archaeological programs particularly relevant to the Middle East. Five scientific workshops and six annual Users' meetings have brought together several hundred scientists from the region, along with researchers from around the world. Training programs have enabled about 100 scientists from the region to work at synchrotron radiation laboratories. These activities have already had significant impact on science and society in the Middle East, for example leading to collaborations between scientists from countries that are not particularly friendly with each other, and to national planning emphasizing synchrotron radiation research. When research starts in 2011 this impact will grow as graduate students are trained in the region in many scientific disciplines, and scientists working abroad are attracted to return.

  8. MORE: Management of Requirements in NPP Modernisation Projects, final report

    International Nuclear Information System (INIS)

    Fredriksen, R.; Katta, V.; Raspotnig, C.; Valkonen, J.

    2008-09-01

    This report documents the work and related activities of the MORE (Management of Requirements in NPP Modernisation Projects) (NKS-R project number NKS-R-2005-47) project. This report also provides a summary of the project activities and deliverables, and discusses possible application areas. The project has aimed at the industrial utilisation of the results from the TACO: (Traceability and Communication of Requirements in Digital I and C Systems Development) (NKS-R project number NKS-R-2002-16, completed June, 2005) project, and practical application of improved approaches and methods for requirements engineering and change management. Finally, the report provides a brief description of the extended industrial network and disseminations of the results in Nordic and NKS related events such as seminars and workshops. (au)

  9. MORE: Management of Requirements in NPP Modernisation Projects, final report

    Energy Technology Data Exchange (ETDEWEB)

    Fredriksen, R.; Katta, V.; Raspotnig, C. (Inst. for energiteknikk (IFE) (Norway)); Valkonen, J. (Technical Research Centre of Finland (VTT) (Finland))

    2008-09-15

    This report documents the work and related activities of the MORE (Management of Requirements in NPP Modernisation Projects) (NKS-R project number NKS-R-2005-47) project. This report also provides a summary of the project activities and deliverables, and discusses possible application areas. The project has aimed at the industrial utilisation of the results from the TACO: (Traceability and Communication of Requirements in Digital I and C Systems Development) (NKS-R project number NKS-R-2002-16, completed June, 2005) project, and practical application of improved approaches and methods for requirements engineering and change management. Finally, the report provides a brief description of the extended industrial network and disseminations of the results in Nordic and NKS related events such as seminars and workshops. (author)

  10. Final Design Report for the RH LLW Disposal Facility (RDF) Project, Revision 3

    International Nuclear Information System (INIS)

    Austad, Stephanie Lee

    2015-01-01

    The RH LLW Disposal Facility (RDF) Project was designed by AREVA Federal Services (AFS) and the design process was managed by Battelle Energy Alliance (BEA) for the Department of Energy (DOE). The final design report for the RH LLW Disposal Facility Project is a compilation of the documents and deliverables included in the facility final design.

  11. Final report for the 'Melt-Vessel Interactions' Project. European Union R and TD Program 4th Framework. MVI project final research report

    Energy Technology Data Exchange (ETDEWEB)

    Sehgal, B.R.; Dinh, T.N.; Nourgaliev, R.R.; Bui, V.A.; Green, J.; Kolb, G.; Karbojian, A.; Theerthan, S.A.; Gubaidulline, A. [Royal Inst. of Tech., Stockholm (Sweden). Div. of Nuclear Power Safety; Helle, M.; Kymaelaeinen, O.; Tuomisto, H. [IVO Power Engineering Ltd., Vantaa (Finland); Bonnet, J.M.; Rouge, S.; Narcoux, M.; Liegeois, A. [CEA - Grenoble (France); Turland, B.D.; Dobson, G.P. [AEA Technology plc, Dorchester (United Kingdom); Siccama, A. [ECN Nuclear Research, Petten (Netherlands); Ikonen, K. [VTT Energy, Helsinki (Finland); Parozzi, F. [ENEL - SRI/PAM/GRA, Segrate, MI (Italy); Kolev, N. [Siemens AG, Erlangen (Germany); Caira, M. [Univ. of Roma (Italy)

    1999-04-01

    The Melt Vessel Interaction (MVI) project is concerned with the consequences of the interactions that a core melt, generated during a postulated severe accident in a light water reactor, may have with the pressure vessel. In particular, the issues concerned with the failure of the vessel bottom head are the focus of the research. The specific objectives of the project are to obtain data and develop validated models, which could be applied to prototypic plants, and accident conditions, for resolution of issues related to the melt vessel interactions. The project work has been performed by nine partners having varied responsibility. The work included a large number of experiments, with simulant materials, whose observations and results are employed, respectively, to understand the physical mechanisms and to develop validated models. Applications to the prototypic geometry and conditions have also been performed. This report is volume 1 of the Final Report for the Project, in which a summary of the progress achieved in the experimental program is provided. We have, however, included some aspects of the modeling activities. Volume 2 of the Final report describes the progress achieved in the modeling program. The progress achieved in the experimental and modeling parts of the Project has led to the resolution of some of the issues of melt vessel interaction. Considerable progress was also achieved towards resolution of the remaining issues.

  12. Funding problems threaten Middle East's synchrotron

    CERN Multimedia

    McCabe, H

    1999-01-01

    Scientists will tour the Middle East to try to raise support for the Synchrotron radiation for Experimental Science and Applications in the Middle East project. The plan is to dismantle and move a decommissioned synchrotron from Berlin to the Middle East where scientists of any nationality would be able to use it (3 paragraphs).

  13. Leven estuary project. Fisheries Department final report

    OpenAIRE

    Bayliss, B.D.

    1997-01-01

    This is the report on the Leven estuary project: Fisheries Department final report produced by the Environment Agency North West in 1997. This report contains information about Leven estuary, river Leven catchment, river Crake catchment and the Ulverston Discharges. The Leven estuary is characterised by being very shallow, and shares the extremely variable tides and currents that characterize the whole of Morecambe Bay. There was little detailed knowledge of the impact on the Leven estuary, a...

  14. Analysis of final year DVM research projects submitted to the Faculty ...

    African Journals Online (AJOL)

    This study analyzed the intellectual output of the undergraduate final year students. research projects submitted to the Faculty of Veterinary Medicine, Usmanu Danfodiyo University, Sokoto, from 1994 to 2004. The findings of the study show that a total of 194 research projects were produced within the period under study.

  15. Best management practices plan for the Lower East Fork Poplar Creek remedial action project, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-08-01

    The U.S. Department of Energy (DOE) has three major operating facilities on the DOE Oak Ridge Reservation (ORR) in Oak Ridge, Tennessee: the Oak Ridge Y-12 Plant, the K-25 Site, and the Oak Ridge National Laboratory (ORNL) managed by Lockheed Martin Environmental Research Corporation. All facilities are managed by Lockheed Martin Energy Systems, Incorporated (Energy Systems) for the DOE. The Y-12 Plant is adjacent to the city of Oak Ridge and is also upstream from Oak Ridge along East Fork Poplar Creek. The portion of the creek downstream from the Y-12 Plant is Lower East Fork Poplar Creek (LEFPC). This project will remove mercury-contaminated soils from the LEFPC floodplain, transport the soils to Industrial Landfill V (ILF-V), and restore any affected areas. This project contains areas that were designated in 1989 as a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) site. The site includes DOE property and portions of commercial, residential, agricultural, and miscellaneous areas within the city of Oak Ridge

  16. Environmental monitoring in the Middle East. Special evaluation review

    International Nuclear Information System (INIS)

    1995-01-01

    After the Chernobyl accident some Middles East countries approached the IAEA with their concerns about contamination. Therefore, a regional project (RER/9/003, Environmental Monitoring in the Middle East) was established in 1987. The present document is a progress report of this project. It discusses project design, project management, its implementation and achievements. Certain conclusions and recommendations are given based on the evaluation of the findings

  17. Environmental monitoring in the Middle East. Special evaluation review

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-01-19

    After the Chernobyl accident some Middles East countries approached the IAEA with their concerns about contamination. Therefore, a regional project (RER/9/003, Environmental Monitoring in the Middle East) was established in 1987. The present document is a progress report of this project. It discusses project design, project management, its implementation and achievements. Certain conclusions and recommendations are given based on the evaluation of the findings.

  18. Research of water resources allocation of South-to-North Water Diversion East Route Project in Jiangsu Province ,Eastern China

    Science.gov (United States)

    Zeng, C.

    2015-12-01

    Optimized allocation of water resources is the important means of solving regional water shortage and can improve the utilization of water resources. Water resources allocation in the large-scale water diversion project area is the current research focus. This research takes the east route of the South-to-North Water Transfer Project in Jiangsu province as the research area, based on the hydrological model, agricultural irrigation quota model, and water project scheduling model, a water resources allocation model was constructed. The research carried on generalized regional water supply network, simulated the water supply, water demand and water deficit in agriculture, industry, life, ecology and lock under the status quo and planning engineering conditions. According to the results, the east route of the South-to-North Water Transfer Project is helpful to improve regional water shortage situation. The results showed that pump output increase by 2.8 billion cubic meters of water. On the conditions of P = 95%, 75% and 50%, compared with the benchmark year, water demand increases slightly due to the need of social and economic development in planning years, and water supply increased significantly because of new diversion ability. Water deficit are greatly reduced by 74.9% especially in the commonly drought condition because of the new project operation and optimized allocation of water resources.

  19. 77 FR 62256 - Notice of Availability of the Final Environmental Impact Statement for the Mount Hope Project...

    Science.gov (United States)

    2012-10-12

    ... of the Final Environmental Impact Statement for the Mount Hope Project, Eureka County, NE AGENCY... prepared a Final Environmental Impact Statement (EIS) for the Mount Hope Project and by this notice is... Register. ADDRESSES: Copies of the Mount Hope Project Final EIS are available at the Battle Mountain...

  20. Joint Projections of US East Coast Sea Level and Storm Surge

    Science.gov (United States)

    Little, Christopher M.; Horton, Radley M.; Kopp, Robert E.; Oppenheimer, Michael; Vecchi, Gabriel A.; Villarini, Gabriele

    2015-01-01

    Future coastal flood risk will be strongly influenced by sea-level rise (SLR) and changes in the frequency and intensity of tropical cyclones. These two factors are generally considered independently. Here, we assess twenty-first century changes in the coastal hazard for the US East Coast using a flood index (FI) that accounts for changes in flood duration and magnitude driven by SLR and changes in power dissipation index (PDI, an integrated measure of tropical cyclone intensity, frequency and duration). Sea-level rise and PDI are derived from representative concentration pathway (RCP) simulations of 15 atmosphere- ocean general circulation models (AOGCMs). By 2080-2099, projected changes in the FI relative to 1986-2005 are substantial and positively skewed: a 10th-90th percentile range 4-75 times higher for RCP 2.6 and 35-350 times higher for RCP 8.5. High-end Fl projections are driven by three AOGCMs that project the largest increases in SLR, PDI and upper ocean temperatures. Changes in PDI are particularly influential if their intra-model correlation with SLR is included, increasing the RCP 8.5 90th percentile FI by a further 25%. Sea-level rise from other, possibly correlated, climate processes (for example, ice sheet and glacier mass changes) will further increase coastal flood risk and should be accounted for in comprehensive assessments.

  1. The LiveWire Project final report

    Energy Technology Data Exchange (ETDEWEB)

    Brown, C.D.; Nelson, T.T. [Enova Technology, San Diego, CA (United States); Kelly, J.C.; Dominguez, H.A. [Paragon Consulting Services, La Verne, CA (United States)

    1997-10-01

    Utilities across the US have begun pilot testing a variety of hardware and software products to develop a two-way communications system between themselves and their customers. Their purpose is to reduce utility operating costs and to provide new and improved services for customers in light of pending changes in the electric industry being brought about by deregulation. A consortium including utilities, national labs, consultants, and contractors, with the support of the Department of Energy (DOE) and the Electric Power Research Institute (EPRI), initiated a project that utilized a hybrid fiber-coax (HFC) wide-area network integrated with a CEBus based local area network within the customers home. The system combined energy consumption data taken within the home, and home automation features to provide a suite of energy management services for residential customers. The information was transferred via the Internet through the HFC network, and presented to the customer on their personal computer. This final project report discusses the design, prototype testing, and system deployment planning of the energy management system.

  2. Upgrade of ICRF heating system on EAST

    International Nuclear Information System (INIS)

    Chen Gen; Zhao Yanpin; Mao Yuzhou

    2013-01-01

    ICRF (Ion Cyclotron Range of Frequency) heating is an essential heating and current drive tool on EAST (Experimental Advanced Superconducting Tokamak). The high-power steady-state transmitters were designed as a part of research and development of ICRF heating system which aimed at output power of 1.5 MW for 1000 s in a frequency range of 25 to 70 MHz. There are 3 stage power amplifiers for each transmitter. Tube TH525A and TH535 were chosen for drive power amplifier (DPA) and final power amplifier (FPA), respectively. The power supply system of DPA and FPA were upgraded by using reliable PSM high voltage sources, whose response time is less than 5 μs. The ICRF system, which consists of 8 transmitters, will give out more than 10 MW total output power in the future. Four of them have been already fabricated, and another four are under construction. Three liquid stub tuners are used for impedance matching between antennas and transmitters, which can be only tuned shot to shot. There are two fast wave heating antennas which are assembled at I port and B port on EAST. Several projects are in progress including fast response impedance matching, distributed data acquisition and control system and so on for EAST ICRF heating system. (author)

  3. El Paso County Geothermal Project at Fort Bliss. Final Project Report

    Energy Technology Data Exchange (ETDEWEB)

    Lear, Jon [Ruby Mountain Inc., Salt Lake City, UT (United State); Bennett, Carlon [Ruby Mountain Inc., Salt Lake City, UT (United State); Lear, Dan [Ruby Mountain Inc., Salt Lake City, UT (United State); Jones, Phil L. [Ruby Mountain Inc., Salt Lake City, UT (United State); Burdge, Mark [Evergreen Clean Energy Management, Provo, UT (United States); Barker, Ben [Evergreen Clean Energy Management, Provo, UT (United States); Segall, Marylin [Univ. of Utah, Salt Lake City, UT (United States). Energy and Geoscience Inst.; Moore, Joseph [Univ. of Utah, Salt Lake City, UT (United States). Energy and Geoscience Inst.; Nash, Gregory [Univ. of Utah, Salt Lake City, UT (United States). Energy and Geoscience Inst.; Jones, Clay [Univ. of Utah, Salt Lake City, UT (United States). Energy and Geoscience Inst.; Simmons, Stuart [Univ. of Utah, Salt Lake City, UT (United States). Energy and Geoscience Inst.; Taylor, Nancy [Univ. of Utah, Salt Lake City, UT (United States). Energy and Geoscience Inst.

    2016-02-01

    The El Paso County Geothermal Project at Fort Bliss was an effort to determine the scale and scope of geothermal resources previously identified on Fort Bliss’ McGregor Range in southern Otero County, New Mexico. The project was funded with a $5,000,000 grant to El Paso County from the U.S. Department of Energy (DOE) as part of the American Recovery and Reinvestment Act of 2009 and a $4,812,500 match provided by private sector partners. The project was administered through the DOE Golden Field Office to awardee El Paso County. The primary subcontractor to El Paso County and project Principal Investigator - Ruby Mountain Inc. (RMI) of Salt Lake City, Utah - assembled the project team consisting of Evergreen Clean Energy Management (ECEM) of Provo, Utah, and the Energy & Geoscience Institute at the University of Utah (EGI) in Salt Lake City, UT to complete the final phases of the project. The project formally began in May of 2010 and consisted of two preliminary phases of data collection and evaluation which culminated in the identification of a drilling site for a Resource Confirmation Well on McGregor Range. Well RMI 56-5 was drilled May and June 2013 to a depth of 3,030 ft. below ground level. A string of slotted 7 inch casing was set in 8.75 inch hole on bottom fill at 3,017 ft. to complete the well. The well was drilled using a technique called flooded reverse circulation, which is most common in mineral exploration. This technique produced an exceptionally large and complete cuttings record. An exciting development at the conclusion of drilling was the suspected discovery of a formation that has proven to be of exceptionally high permeability in three desalinization wells six miles to the south. Following drilling and preliminary testing and analysis, the project team has determined that the McGregor Range thermal anomaly is large and can probably support development in the tens of megawatts.

  4. Prototypical consolidation demonstration project - Final fuel recommendation report

    International Nuclear Information System (INIS)

    Piscitella, R.R.; Paskey, W.R.

    1987-01-01

    The Prototypical Consolidation Demonstration (PCD) Project will, in its final phase, conduct a demonstration of the equipment's ability to consolidate actual spent commercial fuel. Since budget and schedule limitations do not allow this demonstration to include all types of fuel assemblies, a selection process was utilized to identify the fuel types that would represent predominate fuel inventories and that would demonstrate the equipment's abilities. The Pressurized Water Reactor (PWR) fuel assemblies that were suggested for use in the PCD Project Hot Demonstration were Babcock and Wilcox (B and W) 15 x 15's, and Westinghouse (WE) 15 x 15's. The Boiling Water Reactor (BWR) fuel suggested was the General Electric (GE) 8 x 8

  5. PROJECT ANQA: DIGITIZING AND DOCUMENTING CULTURAL HERITAGE IN THE MIDDLE EAST

    Directory of Open Access Journals (Sweden)

    S. Akhtar

    2017-08-01

    Full Text Available The practice of digitizing cultural heritage sites is gaining ground among conservation scientists and scholars in architecture, art history, computer science, and related fields. Recently, the location of such sites in areas of intense conflict has highlighted the urgent need for documenting cultural heritage for the purposes of preservation and posterity. The complex histories of such sites requires more than just their digitization, and should also include the meaningful interpretation of buildings and their surroundings with respect to context and intangible values. Project Anqa is an interdisciplinary and multi-partner effort that goes beyond simple digitization to record at-risk heritage sites throughout the Middle East and Saharan Africa, most notably in Syria and Iraq, before they are altered or destroyed. Through a collaborative process, Anqa assembles documentation, historically contextualizes it, and makes data accessible and useful for scholars, peers, and the wider public through state-of-the-art tools. The aim of the project is to engage in capacity-building on the ground in Syria and Iraq, as well as to create an educational web platform that informs viewers about cultural heritage in the region through research, digital storytelling, and the experience of virtual environments.

  6. Project Anqa: Digitizing and Documenting Cultural Heritage in the Middle East

    Science.gov (United States)

    Akhtar, S.; Akoglu, G.; Simon, S.; Rushmeier, H.

    2017-08-01

    The practice of digitizing cultural heritage sites is gaining ground among conservation scientists and scholars in architecture, art history, computer science, and related fields. Recently, the location of such sites in areas of intense conflict has highlighted the urgent need for documenting cultural heritage for the purposes of preservation and posterity. The complex histories of such sites requires more than just their digitization, and should also include the meaningful interpretation of buildings and their surroundings with respect to context and intangible values. Project Anqa is an interdisciplinary and multi-partner effort that goes beyond simple digitization to record at-risk heritage sites throughout the Middle East and Saharan Africa, most notably in Syria and Iraq, before they are altered or destroyed. Through a collaborative process, Anqa assembles documentation, historically contextualizes it, and makes data accessible and useful for scholars, peers, and the wider public through state-of-the-art tools. The aim of the project is to engage in capacity-building on the ground in Syria and Iraq, as well as to create an educational web platform that informs viewers about cultural heritage in the region through research, digital storytelling, and the experience of virtual environments.

  7. Energy final consumption projection - 1985/2005 - basic scenery - Minas Gerais State

    International Nuclear Information System (INIS)

    1989-03-01

    A projection of the final energy consumption study for the Minas Gerais State until 2005 year is presented. The conclusion of this projection shows a increasing of 108,8% for the total energy. The industries will be response for 62,0% and the transport sector will use 20,7% of the total energy in 2005. (L.J.C.)

  8. 76 FR 64085 - Post-2014 Resource Pool-Loveland Area Projects, Final Power Allocation

    Science.gov (United States)

    2011-10-17

    ... Resource Pool; Loveland Area Projects, General Eligibility Criteria. The resource pool for capacity and... transmission in Kansas. Final allocation of the Post-2014 Resource Pool; Loveland Area Projects, is contingent...

  9. Final report on the maintenance asset management project : phase II.

    Science.gov (United States)

    2013-07-01

    Iowa Department of Transportation (IA DOT) is finalizing research to streamline field inventory/inspection of culverts by Maintenance and Construction staff while maximizing the use of tablet technologies. The project began in 2011 to develop some ne...

  10. Project No. 8 - Final decommissioning plan

    International Nuclear Information System (INIS)

    2000-01-01

    Ignalina NPP should prepare the final Ignalina NPP unit 1 decommissioning plan by march 31, 2002. This plan should include the following : description of Ignalina NPP and the Ignalina NPP boundary that could be influenced by decommissioning process; decommissioning strategy selected and a logical substantiation for this selection; description of the decommissioning actions suggested and a time schedule for the actions to be performed; conceptual safety and environmental impact assessment covering ionizing radiation and other man and environment impact; description of the environmental monitoring program proposed during decommissioning process; description of the waste management proposed; assessment of decommissioning expenses including waste management, accumulated funds and other sources. Estimated project cost - 0.75 M EURO

  11. N Area Final Project Program Plan

    International Nuclear Information System (INIS)

    Day, R.S.; Duncan, G.M; Trent, S.J.

    1998-07-01

    The N Area Final Project Program Plan is issued for information and use by the U.S. Department of Energy (DOE), the Environmental Restoration Contractor (ERC) for the Hanford Site, and other parties that require workscope knowledge for the deactivation of N Reactor facilities and remediation of the 100-N Area. This revision to the program plan contains the updated critical path schedule to deactivate N Reactor and its supporting facilities, cleanout of the N Reactor Fuel Storage Basin (105-N Basin), and remediate the 100-N Area. This document reflects notable changes in the deactivation plan for N Reactor, including changes in deactivation status, the N Basin cleanout task, and 100-N Area remediation

  12. Future Projection of Summer Extreme Precipitation from High Resolution Multi-RCMs over East Asia

    Science.gov (United States)

    Kim, Gayoung; Park, Changyong; Cha, Dong-Hyun; Lee, Dong-Kyou; Suh, Myoung-Seok; Ahn, Joong-Bae; Min, Seung-Ki; Hong, Song-You; Kang, Hyun-Suk

    2017-04-01

    Recently, the frequency and intensity of natural hazards have been increasing due to human-induced climate change. Because most damages of natural hazards over East Asia have been related to extreme precipitation events, it is important to estimate future change in extreme precipitation characteristics caused by climate change. We investigate future changes in extremal values of summer precipitation simulated by five regional climate models participating in the CORDEX-East Asia project (i.e., HadGEM3-RA, RegCM4, MM5, WRF, and GRIMs) over East Asia. 100-year return value calculated from the generalized extreme value (GEV) parameters is analysed as an indicator of extreme intensity. In the future climate, the mean values as well as the extreme values of daily precipitation tend to increase over land region. The increase of 100-year return value can be significantly associated with the changes in the location (intensity) and scale (variability) GEV parameters for extreme precipitation. It is expected that the results of this study can be used as fruitful references when making the policy of disaster management. Acknowledgements The research was supported by the Ministry of Public Safety and Security of Korean government and Development program under grant MPSS-NH-2013-63 and the National Research Foundation of Korea Grant funded by the Ministry of Science, ICT and Future Planning of Korea (NRF-2016M3C4A7952637) for its support and assistant in completion of the study.

  13. 78 FR 33101 - Notice of Availability of the Record of Decision for the Alta East Wind Project, Kern County...

    Science.gov (United States)

    2013-06-03

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [CACA-052537, LLCAD05000, L51010000.LVRWB11B4520.FX0000] Notice of Availability of the Record of Decision for the Alta East Wind Project, Kern County, California AGENCY: Bureau of Land Management, Interior. ACTION: Notice of Availability. SUMMARY...

  14. 78 FR 45268 - Notice of Availability of the San Diego Gas & Electric Ocotillo Sol Solar Project Final...

    Science.gov (United States)

    2013-07-26

    ...] Notice of Availability of the San Diego Gas & Electric Ocotillo Sol Solar Project Final Environmental...) Ocotillo Sol Solar Project in Imperial County, California, and by this notice is announcing its... Ocotillo Sol Solar Project Final EIS/Proposed CDCA Plan Amendment have been sent to affected Federal, State...

  15. Regional Integration: A Political Federation of the East African ...

    African Journals Online (AJOL)

    The aim of this paper is to explore the possibility and viability of an East African political federation project. Since the late 1800s under the then British East Africa, the countries of East Africa have been searching for ways to integrate. The search led to the establishment of the East African Community (EAC) in December ...

  16. Measuring Entrepreneurial Activity in the Middle East and North Africa

    International Development Research Centre (IDRC) Digital Library (Canada)

    Total funding. CA$ 678,500. Country(s). Middle East, North of Sahara, South of Sahara, Central Asia, Far East Asia, South Asia. Project Leader. Dr. Mohamed Derrabi. Institution. Al Akhawayn University. Institution Country. Morocco. Institution Website. http://www.aui.ma. Project Leader. Abedou Abderrahamne. Institution.

  17. The Elder Abuse Prevention Project, Phase Two, Three and Four. Final Report.

    Science.gov (United States)

    Regina Univ. (Saskatchewan). Univ. Extension. Seniors Education Centre.

    This document presents the final report from an educational and community development program designed to raise awareness about the abuse and neglect of the elderly. The Elder Abuse Prevention Project is briefly described in terms of project goals, objectives, the model used, the target groups served, and the evaluation processes employed. It is…

  18. Harmonized biosafety regulations are key to trust building in regional agbiotech partnerships: the case of the Bt cotton project in East Africa

    Directory of Open Access Journals (Sweden)

    Ezezika Obidimma C

    2012-11-01

    Full Text Available Abstract Background The Bacillus thuringiensis (Bt cotton public-private partnership (PPP project in East Africa was designed to gather baseline data on the effect of Bt cotton on biodiversity and the possibility of gene flow to wild cotton varieties. The results of the project are intended to be useful for Kenya, Uganda, and Tanzania when applying for biosafety approvals. Using the backdrop of the different biosafety regulations in the three countries, we investigate the role of trust in the Bt cotton partnership in East Africa. Methods Data were collected by reviewing relevant project documents and peer-reviewed articles on Bt cotton in Tanzania, Kenya and Uganda; conducting face-to-face interviews with key informants of the project; and conducting direct observations of the project. Data were analyzed based on recurring and emergent themes to create a comprehensive narrative on how trust is understood and built among the partners and with the community. Results We identified three factors that posed challenges to building trust in the Bt cotton project in East Africa: different regulatory regimes among the three countries; structural and management differences among the three partner institutions; and poor public awareness of GM crops and negative perceptions of the private sector. The structural and management differences were said to be addressed through joint planning, harmonization of research protocols, and management practices, while poor public awareness of GM crops and negative perceptions of the private sector were said to be addressed through open communication, sharing of resources, direct stakeholder engagement and awareness creation. The regulatory differences remained outside the scope of the project. Conclusions To improve the effectiveness of agbiotech PPPs, there is first a need for a regulatory regime that is acceptable to both the public and private sector partners. Second, early and continuous joint planning; sharing of

  19. East Asian Studies of Tropospheric Aerosols and their Impact on Regional Climate (EAST -AIRC): An overview

    Science.gov (United States)

    Zhangqing, Li; Li, C.; Chen, H.; Tsay, S.-C.; Holben, B.; Huang, J.; Li, B.; Maring, H.; Qian, Y.; Shi, G.; hide

    2011-01-01

    As the most populated region of the world, Asia is a major source of aerosols with potential large impact over vast downstream areas, Papers published in this special section describe the variety of aerosols observed in China and their effects and interactions with the regional climate as part of the East Asian Study of Tropospheric Aerosols and their Impact on Regional Climate (EAST-AIRC), The majority of the papers are based on analyses of observations made under three field projects, namely, the Atmospheric Radiation Measurements (ARM) Mobile Facility mission in China (AMF-China), the East Asian Study of Tropospheric Aerosols: An International Regional Experiment (EAST-AIRE), and the Atmospheric Aerosols of China and their Climate Effects (AACCE), The former two are U,S,-China collaborative projects, and the latter is a part of the China's National Basic Research program (or often referred to as "973 project"), Routine meteorological data of China are also employed in some studies, The wealth of general and speCIalized measurements lead to extensive and close-up investigations of the optical, physical, and chemical properties of anthropogenic, natural, and mixed aerosols; their sources, formation, and transport mechanisms; horizontal, vertical, and temporal variations; direct and indirect effects; and interactions with the East Asian monsoon system, Particular efforts are made to advance our understanding of the mixing and interaction between dust and anthropogenic pollutants during transport. Several modeling studies were carried out to simulate aerosol impact on radiation budget, temperature, precipitation, wind and atmospheric circulation, fog, etc, In addition, impacts of the Asian monsoon system on aerosol loading are also simulated.

  20. How many years of life did the fall of the Berlin Wall add? A projection of East German life expectancy.

    Science.gov (United States)

    Vogt, Tobias C

    2013-01-01

    In the two decades since reunification, East Germans have experienced a large increase in life expectancy and a convergence with the West German mortality level. This gain in life expectancy appears even more impressive if we assume a different scenario in which the Berlin Wall did not fall, and the old East Germany still existed. This analysis takes into account that East German mortality would not have remained static without reunification. Thus, it shows how many years of life expectancy were actually added by the fall of the Berlin Wall. The analysis shows the improvements for single age groups by projecting life expectancy based on mortality levels during the 1970s and 1980s using the Lee-Carter method. I use national-level data for both sexes for East Germany before reunification. I find that, without reunification, current life expectancy at birth among East Germans would be 4.0 years lower for females and 5.7 years lower for males. I also show that older East Germans were the main demographic beneficiaries of reunification. Female and male mortality improvements in the age groups above 60 contributed up to 80% to the actual gains in life expectancy. Had the Berlin Wall not fallen, East German mortality would not have remained static but improved at a far slower rate. Thus, this counterfactual approach shows for the first time how many years of life were actually gained by reunification and how much of these gains were attributable to mortality improvements among the elderly. Copyright © 2013 S. Karger AG, Basel.

  1. Hellsgate Winter Range : Wildlife Mitigation Project. Final Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-03-01

    Bonneville Power Administration (BPA) proposes to fund the Hellsgate Winter Range Wildlife Mitigation Project (Project) in a cooperative effort with the Colville Confederated Tribes and the Bureau of Indian Affairs (BIA). The proposed action would allow the sponsors to secure property and conduct wildlife management activities within the boundaries of the Colville Indian Reservation. This Final Environmental Assessment (EA) examines the potential environmental effects of acquiring and managing property for wildlife and wildlife habitat within a large project area. This area consists of several separated land parcels, of which 2,000 hectares (4,943 acres) have been purchased by BPA and an additional 4,640 hectares (11,466 acres) have been identified by the Colville Confederated Tribes for inclusion in the Project. Four proposed activities (habitat protection, habitat enhancement, operation and maintenance, and monitoring and evaluation) are analyzed. The proposed action is intended to meet the need for mitigation of wildlife and wildlife habitat that was adversely affected by the construction of Grand Coulee and Chief Joseph Dams and their reservoirs.

  2. Hellsgate Winter Range: Wildlife mitigation project. Final environmental assessment

    International Nuclear Information System (INIS)

    1995-03-01

    Bonneville Power Administration (BPA) proposes to fund the Hellsgate Winter Range Wildlife Mitigation Project (Project) in a cooperative effort with the Colville Confederated Tribes and the Bureau of Indian Affairs (BIA). The proposed action would allow the sponsors to secure property and conduct wildlife management activities within the boundaries of the Colville Indian Reservation. This Final Environmental Assessment (EA) examines the potential environmental effects of acquiring and managing property for wildlife and wildlife habitat within a large project area. This area consists of several separated land parcels, of which 2,000 hectares (4,943 acres) have been purchased by BPA and an additional 4,640 hectares (11,466 acres) have been identified by the Colville Confederated Tribes for inclusion in the Project. Four proposed activities (habitat protection, habitat enhancement, operation and maintenance, and monitoring and evaluation) are analyzed. The proposed action is intended to meet the need for mitigation of wildlife and wildlife habitat that was adversely affected by the construction of Grand Coulee and Chief Joseph Dams and their reservoirs

  3. Zachary-Fort Lauderdale pipeline construction and conversion project: final supplement to final environmental impact statement. Docket No. CP74-192

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-05-01

    This Final Supplement to the Final Environmental Impact Statement (Final Supplement) evaluates the economic, engineering, and environmental aspects of newly developed alternatives to an abandonment/conversion project proposed by Florida Gas Transmission Company (Florida Gas). It also updates the staff's previous FEIS and studies revisions to the original proposal. Wherever possible, the staff has adopted portions of its previous FEIS in lieu of reprinting portions of that analysis which require no change. 60 references, 8 figures, 35 tables.

  4. Summertime land-sea thermal contrast and atmospheric circulation over East Asia in a warming climate—Part I: Past changes and future projections

    Science.gov (United States)

    Kamae, Youichi; Watanabe, Masahiro; Kimoto, Masahide; Shiogama, Hideo

    2014-11-01

    Land-sea surface air temperature (SAT) contrast, an index of tropospheric thermodynamic structure and dynamical circulation, has shown a significant increase in recent decades over East Asia during the boreal summer. In Part I of this two-part paper, observational data and the results of transient warming experiments conducted using coupled atmosphere-ocean general circulation models (GCMs) are analyzed to examine changes in land-sea thermal contrast and the associated atmospheric circulation over East Asia from the past to the future. The interannual variability of the land-sea SAT contrast over the Far East for 1950-2012 was found to be tightly coupled with a characteristic tripolar pattern of tropospheric circulation over East Asia, which manifests as anticyclonic anomalies over the Okhotsk Sea and around the Philippines, and a cyclonic anomaly over Japan during a positive phase, and vice versa. In response to CO2 increase, the cold northeasterly winds off the east coast of northern Japan and the East Asian rainband were strengthened with the circulation pattern well projected on the observed interannual variability. These results are commonly found in GCMs regardless of future forcing scenarios, indicating the robustness of the East Asian climate response to global warming. The physical mechanisms responsible for the increase of the land-sea contrast are examined in Part II.

  5. Northeast Oregon Hatchery Project, Final Siting Report.

    Energy Technology Data Exchange (ETDEWEB)

    Watson, Montgomery

    1995-03-01

    This report presents the results of site analysis for the Bonneville Power Administration Northeast Oregon Hatchery Project. The purpose of this project is to provide engineering services for the siting and conceptual design of hatchery facilities for the Bonneville Power Administration. The hatchery project consists of artificial production facilities for salmon and steelhead to enhance production in three adjacent tributaries to the Columbia River in northeast Oregon: the Grande Ronde, Walla Walla, and Imnaha River drainage basins. Facilities identified in the master plan include adult capture and holding facilities; spawning incubation, and early rearing facilities; full-term rearing facilities; and direct release or acclimation facilities. The evaluation includes consideration of a main production facility for one or more of the basins or several smaller satellite production facilities to be located within major subbasins. The historic and current distribution of spring and fall chinook salmon and steelhead was summarized for the Columbia River tributaries. Current and future production and release objectives were reviewed. Among the three tributaries, forty seven sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed.

  6. District heating demonstration project. Swiecie, Poland. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-06-01

    In January 1997 the district heating company in Swiecie, Poland, was donated DKK 1.3 Mio. as a part of the environmental related energy sector programme by the Danish government for a demonstration project. The Danish consultancy company Carl Bro a/s was appointed to conduct the work. The project was finished in January 1999. The present final report outlines the activities of the demonstration project. The activities of the project were several. Carl Bro a/s elaborated tender documents and procured 79 heat meters for all the substrations in the city in order to prepare for the new energy law and a changed tariff system which was introduced in January 1999. Carl Bro a/s further supported ZEC Swiecie in the development of their new tariff system through information from Danish district heating companies. The demonstration project was designed in the first phase of the project. During the design period one engineer from Swiecie participated in a study tour to Denmark to learn about technical solutions to present problems in Poland. The training course focused on preparation of hot tap water. The site for the demonstation project was in the centre of Swiecie in a housing society located in Wojska Polskiego. The blocks 75 and 75A were selected for modernisation of the substations, and block no. 73 was appointed as a reference block in which only a heat meter was installed. Further, block 75A was equipped with thermostatic valves at all the radiators in the flats. The registered savings during the monitoring period were between 7% and 14%, and an increased comfort in the flats was observed. The housing society`s board of directors were so pleased with the project that by their initiative block no. 77 was refurbished in the same way as the blocks covered by the demonstration project. However, the activities were extended with individual heat meters and the introduction of a new tariff system for the block. The energy savings from this project were substantial, and today

  7. Barcoding, biobanking, ebanking for “One Health” projects in South-East Asia: considering ethics and international law

    OpenAIRE

    Lajaunie, Claire; Morand, Serge; Huan, Tan Boon

    2014-01-01

    A first workshop held within the framework of the PathodivSEA project has been the occasion to identify the major research challenges regarding the emergence of zoonotic infectious diseases in South East Asia and the spread of pathogens responsible from those diseases. Based on supporting evidences indicating the zoonotic origins of those diseases, it appeared urgent to investigate the factors controlling the pathogens-human interface by addressing the “One Health” concept which integrates th...

  8. The AGP-Project conceptual design for a Spanish HLW final disposal facility

    International Nuclear Information System (INIS)

    Biurrun, E.; Engelmann, H.-J.; Huertas, F.; Ulibarri, A.

    1992-01-01

    Within the framework of the AGP Project a Conceptual Design for a HLW Final Disposal Facility to be eventually built in an underground salt formation in Spain has been developed. The AGP Project has the character of a system analysis. In the current project phase I several alternatives has been considered for different subsystems and/or components of the repository. The system variants, developed to such extent as to allow a comparison of their advantages and disadvantages, will allow the selection of a reference concept, which will be further developed to technical maturity in subsequent project phases. (author)

  9. East Asian Values Surveys : making a case for East Asian-origin values survey concepts

    OpenAIRE

    Vinken, Henk

    2006-01-01

    This paper aims to contribute to social scientific work towards enhancing the cultural fit of comparative values surveys projects on a conceptual level both for Western and East Asian survey research communities and their publics. It starts with noting that, after a long period in which Western values were regarded superior ('orientalism'), in recent decades certain East Asian and specifically Confucian values are much celebrated ('reversed orientalism'). Yet, most contemporary cross-cultural...

  10. 76 FR 12096 - McCloud-Pit Project; Notice of Availability of the Final Environmental Impact Statement for the...

    Science.gov (United States)

    2011-03-04

    ... Project; Notice of Availability of the Final Environmental Impact Statement for the Mccloud-Pit... Pit Rivers in Shasta County, California and has prepared a final environmental impact statement (EIS... and the alternatives for relicensing the McCloud-Pit Project. The final EIS documents the views of...

  11. Characterization of the radon source in North-Central Florida. Final report part 1 -- Final project report; Final report part 2 -- Technical report

    International Nuclear Information System (INIS)

    1997-01-01

    This report contains two separate parts: Characterization of the Radon Source in North-Central Florida (final report part 1 -- final project report); and Characterization of the Radon Source in North-Central Florida (technical report). The objectives were to characterize the radon 222 source in a region having a demonstrated elevated indoor radon potential and having geology, lithology, and climate that are different from those in other regions of the U.S. where radon is being studied. Radon availability and transport in this region were described. Approaches for predicting the radon potential of lands in this region were developed

  12. Griffith energy project final environmental impact statement

    International Nuclear Information System (INIS)

    1999-03-01

    Griffith Energy Limited Liability Corporation (Griffith) proposes to construct and operate the Griffith Energy Project (Project), a natural gas-fired, combined cycle power plant, on private lands south of Kingman, Arizona. The Project would be a merchant plant which means that it is not owned by a utility and there is currently no long-term commitment or obligation by any utility to purchase the capacity and energy generated by the power plant. Griffith applied to interconnect its proposed power plant with the Western Area Power Administration's (Western) Pacific Northwest-Pacific Southwest Intertie and Parker-Davis transmission systems. Western, as a major transmission system owner, needs to provide access to its transmission system when it is requested by an eligible organization per existing policies, regulations and laws. The proposed interconnection would integrate the power generated by the Project into the regional transmission grid and would allow Griffith to supply its power to the competitive electric wholesale market. Based on the application, Western's proposed action is to enter into an interconnection and construction agreement with Griffith for the requested interconnections. The proposed action includes the power plant, water wells and transmission line, natural gas pipelines, new electrical transmission lines and a substation, upgrade of an existing transmission line, and access road to the power plant. Construction of segments of the transmission lines and a proposed natural gas pipeline also require a grant of right-of-way across Federal lands administered by the Bureau of Land Management. Public comments on the Draft EIS are addressed in the Final EIS, including addenda and modifications made as a result of the comments and/or new information

  13. Griffith Energy Project Final Environmental Impact Statement

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    1999-04-02

    Griffith Energy Limited Liability Corporation (Griffith) proposes to construct and operate the Griffith Energy Project (Project), a natural gas-fuel, combined cycle power plant, on private lands south of Kingman, Ariz. The Project would be a ''merchant plant'' which means that it is not owned by a utility and there is currently no long-term commitment or obligation by any utility to purchase the capacity and energy generated by the power plant. Griffith applied to interconnect its proposed power plant with the Western Area Power Administration's (Western) Pacific Northwest-Pacific Southwest Intertie and Parker-Davis transmission systems. Western, as a major transmission system owner, needs to provide access to its transmission system when it is requested by an eligible organization per existing policies, regulations and laws. The proposed interconnection would integrate the power generated by the Project into the regional transmission grid and would allow Griffith to supply its power to the competitive electric wholesale market. Based on the application, Western's proposed action is to enter into an interconnection and construction agreement with Griffith for the requested interconnections. The proposed action includes the power plant, water wells and transmission line, natural gas pipelines, new electrical transmission lines and a substation, upgrade of an existing transmission line, and access road to the power plant. Construction of segments of the transmission lines and a proposed natural gas pipeline also require a grant of right-of-way across Federal lands administered by the Bureau of Land Management. Public comments on the Draft EIS are addressed in the Final EIS, including addenda and modifications made as a result of the comments and/or new information.

  14. Identifying Problems in Students’ Final Projects Based on Scientific Writing Guidelines

    Directory of Open Access Journals (Sweden)

    Endang Ernawati

    2010-11-01

    Full Text Available Article analyzed student’s difficulties and abilities in writing their final projects, which were undergraduate theses and undergraduate paper conducted by some students at the English Department, Bina Nusantara University. This was a preliminary study to support an appropriate student guideline in writing their final project. The study was conducted by applying qualitative methods that was by analyzing the four theses and one paper in terms of their format: titles, introduction, theoretical background, analysis, conclusion, bibliography, and paper rubric to analyze the contents. It can be concluded that generally, students, guided by their mentor/lecturer, understand the final paper guidelines and they are able to apply it in their thesis and paper. But, there are still lack of clarity and relevancy in expressing their ideas properly, and their ability in writing in both English and Bahasa Indonesia must be improved. These problems can be overcome by socializing the writing guidelines to both students and lecturers, providing them with critical thinking skills, cooperation with library that will guide them in information literacy skills, and language center that will improve their writing skills. 

  15. 76 FR 67178 - Wells Hydroelectric Project; Notice of Availability of the Final Environmental Impact Statement...

    Science.gov (United States)

    2011-10-31

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2149-152] Wells Hydroelectric Project; Notice of Availability of the Final Environmental Impact Statement for the Wells... application for license for the Wells Hydroelectric Project (FERC No. 2149), located on the Columbia River in...

  16. Staff Helping Attain Relevant Education (Project SHARE): Final Evaluation Report, 1992-93. OREA Report.

    Science.gov (United States)

    Ranadive, Jyoti

    Project SHARE (Staff Helping Attain Relevant Education), a project funded by Title VII of the Elementary and Secondary Education Act, was in its third and final year of operation in 1992-93, in eight primary schools in the Bronx, Brooklyn, and Manhattan (New York). The project served 141 limited English proficient students from low-income families…

  17. Petro-Canada's project to add petroleum product storage tanks to the Municipality of Montreal-East

    International Nuclear Information System (INIS)

    Lefebvre, G.; Joly, R.; Guay, T.

    2006-01-01

    This paper explored the environmental impacts associated with Petro-Canada's project to add petroleum product storage tanks to its refinery in the east-end of Montreal. The project plan is based on a 6 year horizon from 2006-2012. The additional reservoirs would store new products destined for the petrochemical industry and for consumers, thus improving the flexibility and reliability of the refinery. The products would include low sulfur diesel and ethanol gasoline. The project does not involve any increase in refining capacity, and is estimated to cost $15 million. The main issues associated with this project are ambient air quality, the protection of groundwater and soil, as well as the security of areas inhabited by neighbouring areas in risk of a major accident. Emissions of organic compounds, including benzene, are considered minimal considering the use of sealed floating roofs. Geomembranes will be installed under the storage tanks to ensure the protection of groundwater and soil. Any consequences to the population of neighbouring areas resulting from accidents inside the industrial park will be limited since the reservoirs will be located more than 1 km away from a populated area. Quebec's Ministry of Sustainable Development, Environment and Parks recommended that this project be approved as long as the terms and measures of environmental regulations are respected, and that an emergency plan is submitted before the operation of the first reservoir. 1 tab

  18. District Heating Demonstration project. Bydgoszcz, Poland, Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-06-01

    The project was finished in January 1999. The present final report outlines the activities of the pilot project. The activities of the project were: Development of a general model or a design strategy for the modernisation of group substations; Training of selected staff in updated design and latest technologies; Comparing experiences from the reconstructed heat exchanger station with alternative solutions; Investigation of potential sources of financing for the modernisation of the district heating system based on a revised feasibility study. The development of a general model for the future design of the heat exchanger station and the substations resulted in a design guideline which was used for the design of the heat exchanger station. KPEC selected the heat exchanger station CC02, located in area B1, as the object for the heat exchanger reconstruction. The station supplies 42 substations in 20 dwelling houses with a total heat demand of 11 MW. The design of the reconstruction began in the autumn of 1996. The equipment was procured during the spring of 1997 and the bulk of the installation work was finished by October 1997. The appointed design engineer participated in two study tours to Denmark. During the implementation the project was enlarged with an addendum. The addendum consisted of a modernisation of twelve building substations. The monitoring programme was enlarged accordingly and the efficiency of the two solutions were compared and evaluated through the monitoring programme. Even though some of the data are rather limited, the monitoring programme reveals a tendency towards the substation modernisation being twice as efficient as the heat exchanger modernisation. The reconstruction of the heat exchanger station has indicated a heat saving potential of 10% whereas the substation project has indicated a heat saving potential of 20%. The project further shows a huge potential for power savings in the main pumps due to the automatic control. (EHS)

  19. Far East Asia | Page 67 | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Far East Asia. Extrême-Orient. Read more about Environmental Degradation, Social Marginalization and the Dynamics of Vulnerability in the Earthquake of October 2005 (Pakistan). Language English. Read more about Promoting Trade in Services in the Middle East and North Africa : Pilot Project. Language English.

  20. Ferrocyanide safety project ferrocyanide aging studies. Final report

    International Nuclear Information System (INIS)

    Lilga, M.A.; Hallen, R.T.; Alderson, E.V.

    1996-06-01

    This final report gives the results of the work conducted by Pacific Northwest National Laboratory (PNNL) from FY 1992 to FY 1996 on the Ferrocyanide Aging Studies, part of the Ferrocyanide Safety Project. The Ferrocyanide Safety Project was initiated as a result of concern raised about the safe storage of ferrocyanide waste intermixed with oxidants, such as nitrate and nitrite salts, in Hanford Site single-shell tanks (SSTs). In the laboratory, such mixtures can be made to undergo uncontrolled or explosive reactions by heating dry reagents to over 200 degrees C. In 1987, an Environmental Impact Statement (EIS), published by the U.S. Department of Energy (DOE), Final Environmental Impact Statement, Disposal of Hanford Defense High-Level Transuranic and Tank Waste, Hanford Site, Richland, Washington, included an environmental impact analysis of potential explosions involving ferrocyanide-nitrate mixtures. The EIS postulated that an explosion could occur during mechanical retrieval of saltcake or sludge from a ferrocyanide waste tank, and concluded that this worst-case accident could create enough energy to release radioactive material to the atmosphere through ventilation openings, exposing persons offsite to a short-term radiation dose of approximately 200 mrem. Later, in a separate study (1990), the General Accounting Office postulated a worst-case accident of one to two orders of magnitude greater than that postulated in the DOE EIS. The uncertainties regarding the safety envelope of the Hanford Site ferrocyanide waste tanks led to the declaration of the Ferrocyanide Unreviewed Safety Question (USQ) in October 1990

  1. Analysis Of Factors Causing Delays On Harun Nafsi - Hm Rifadin Street In Samarinda East Kalimantan Maintenance Project

    Directory of Open Access Journals (Sweden)

    Fadli

    2017-12-01

    Full Text Available This study aims to identify analyze and describe the factors that affect the project maintenance delay on Harun Nafsi - HM. Rifadin Street in Samarinda East Kalimantan. This research uses qualitative research method by utilizing questionnaires. The 30 participating respondents consist of 14 project implementers and 16 field implementers. The data are analyzed by descriptive statistical technique factor analysis and linear regression analysis. The results show that the factors influencing the delay of maintenance project of Harun Nafis - HM Rifadin Street include 1 time factor and workmanship factor 2 human resources and natural factors 3 geographical conditions late approval plans change and labor strikes and 4 non-optimal working levels and changes in the scope of the project during the work are still ongoing. Based on multiple linear regression analysis coefficient of determination value of 0.824 is obtained. It means that the four factors studied affect 82.4 of project delays and the rest of 27.6 is influenced by other variables out of this study. The results of this study also indicate that the dominant factor for road maintenance project delays is the fourth factor of the factors mentioned. The effort that the contractor needs to undertake is not to expand the employment contract if the project is underway or the contractor does not have the capability to complete another project.

  2. Final Project Report

    DEFF Research Database (Denmark)

    Workspace

    2003-01-01

    of the Disappearing Computer to be that of  “Augmenting reality”, where “Augmented reality” meant:  •  Augmented user – positioning, visualising. •  Augmented environment, Panels, tables and site-pack •  Augmented Artifacts - RFID , tagging, tracking •  Augmented communications – efficient exchange and integration......The primary focus of the WORKSPACE project was to augment the working  environment through the development of spatial computing components, initially for  members of the design professions, but with wider applicability to a range of work  domains.     The project interpreted the requirements...... of the above.    The philosophy was to make the computer disappear by both making it large and  embedding it into the environment (e.g. furniture).  The project has successfully achieved its objectives, and has developed a range of  demonstrator prototypes, some of which is in daily use by practitioners within...

  3. Lessons learned in demonstration projects regarding operational safety during final disposal of vitrified waste and spent fuel

    International Nuclear Information System (INIS)

    Filbert, Wolfgang; Herold, Philipp

    2015-01-01

    The paper summarizes the lessons learned in demonstration projects regarding operational safety during the final disposal of vitrified waste and spent fuel. The three demonstration projects for the direct disposal of vitrified waste and spent fuel are described. The first two demonstration projects concern the shaft transport of heavy payloads of up to 85 t and the emplacement operations in the mine. The third demonstration project concerns the borehole emplacement operation. Finally, open issues for the next steps up to licensing of the emplacement and disposal systems are summarized.

  4. Projections of summertime ozone concentration over East Asia under multiple IPCC SRES emission scenarios

    Science.gov (United States)

    Lee, Jae-Bum; Cha, Jun-Seok; Hong, Sung-Chul; Choi, Jin-Young; Myoung, Ji-Su; Park, Rokjin J.; Woo, Jung-Hun; Ho, Changhoi; Han, Jin-Seok; Song, Chang-Keun

    2015-04-01

    We have developed the Integrated Climate and Air Quality Modeling System (ICAMS) through the one-way nesting of global-regional models to examine the changes in the surface ozone concentrations over East Asia under future climate scenarios. Model simulations have been conducted for the present period of 1996-2005 to evaluate the performance of ICAMS. The simulated surface ozone concentrations reproduced the observed monthly mean concentrations at sites in East Asia with high R2 values (0.4-0.9), indicating a successful simulation to capture both spatial and temporal variability. We then performed several model simulations with the six IPCC SRES scenarios (A2, A1B, A1FI, A1T, B1, and B2) for the next three periods, 2016-2025 (the 2020s), 2046-2055 (the 2050s), and 2091-2100 (the 2090s). The model results show that the projected changes of the annual daily mean maximum eight-hour (DM8H) surface ozone concentrations in summertime for East Asia are in the range of 2-8 ppb, -3 to 8 ppb, and -7 to 9 ppb for the 2020s, the 2050s, and the 2090s, respectively, and are primarily determined based on the emission changes of NOx and NMVOC. The maximum increases in the annual DM8H surface ozone and high-ozone events occur in the 2020s for all scenarios except for A2, implying that the air quality over East Asia is likely to get worse in the near future period (the 2020s) than in the far future periods (the 2050s and the 2090s). The changes in the future environment based on IPCC SRES scenarios would also influence the change in the occurrences of high-concentrations events more greatly than that of the annual DM8H surface ozone concentrations. Sensitivity simulations show that the emissions increase is the key factor in determining future regional surface ozone concentrations in the case of a developing country, China, whereas a developed country, Japan would be influenced more greatly by effects of the regional climate change than the increase in emissions.

  5. Programmable SAW development :Sandia/NASA project final report.

    Energy Technology Data Exchange (ETDEWEB)

    Brocato, Robert Wesley

    2004-10-01

    This report describes a project to develop both fixed and programmable surface acoustic wave (SAW) correlators for use in a low power space communication network. This work was funded by NASA at Sandia National Laboratories for fiscal years 2004, 2003, and the final part of 2002. The role of Sandia was to develop the SAW correlator component, although additional work pertaining to use of the component in a system and system optimization was also done at Sandia. The potential of SAW correlator-based communication systems, the design and fabrication of SAW correlators, and general system utilization of those correlators are discussed here.

  6. Final Technical Report, Wind Generator Project (Ann Arbor)

    Energy Technology Data Exchange (ETDEWEB)

    Geisler, Nathan [City of Ann Arbor, MI (United States)

    2017-03-20

    A Final Technical Report (57 pages) describing educational exhibits and devices focused on wind energy, and related outreach activities and programs. Project partnership includes the City of Ann Arbor, MI and the Ann Arbor Hands-on Museum, along with additional sub-recipients, and U.S. Department of Energy/Office of Energy Efficiency and Renewable Energy (EERE). Report relays key milestones and sub-tasks as well as numerous graphics and images of five (5) transportable wind energy demonstration devices and five (5) wind energy exhibits designed and constructed between 2014 and 2016 for transport and use by the Ann Arbor Hands-on Museum.

  7. GENRE ANALYSIS OF THE ENGLISH FINAL PROJECT ABSTRACTS WRITTEN BY THE STUDENTS OF ENGLISH EDUCATION DEPARTMENT OF IKIP PGRI SEMARANG

    Directory of Open Access Journals (Sweden)

    Wiyaka Wiyaka

    2010-12-01

    Full Text Available This study is specifically focused on the student final project abstract based on genre analysis which covers the study of the generic structure and the linguistic features. The statements of the study are: (1. How do the students of English Education Department of IKIP PGRI Semarang realize the generic structure in their final project abstracts (2. How do they realize the linguistic features in their final project abstracts, and (3. What is the contribution of the result of the study to the English Education Program of IKIP PGRI Semarang. The main purpose of this study is to find out the generic structure and linguistic features of the final project abstracts and analyze the contribution of this study to the English Department. This study applies the descriptive qualitative method. The object of this study is the final project abstracts written by English Education Department students of ‘IKIP PGRI Semarang’. The total of 10 final projects formed the data of this study. The data of the study were analyzed using the genre analysis approach. The first step of data analysis was identifying the Moves which was done by using Linguistic evidence and understanding the texts. The finding shows that only some of the final project abstracts made by the students of IKIP PGRI applied the five Moves. It is found that two Moves are applied in all abstracts, they are Purpose and Method Moves (100%. Situating the research is used in five abstracts (50%. Meanwhile the third move that is the Result Move used in eight abstracts (80%. The Conclusion Move found in five abstracts (50%. The result of the analysis showed that two personal pronouns were found in the final project abstracts. Personal pronouns such as ‘the writer’ and ‘the researcher’ were found in all of the abstracts. Personal pronoun ‘she’ was found in one abstract. Finally, there are only five expressions of hedges that are used in the final project abstracts, they

  8. Nuclear emergency preparedness. Final report of the Nordic Nuclear Safety Research Project BOK-1

    DEFF Research Database (Denmark)

    Lauritzen, B.

    2002-01-01

    Final report of the Nordic Nuclear Safety Research project BOK-1. The BOK-1 project, “Nuclear Emergency Preparedness”, was carried out in 1998-2001 with participants from the Nordic and Baltic Sea regions. The project consists of six sub-projects:Laboratory measurements and quality assurance (BOK-1.......1); Mobile measurements and measurement strategies (BOK-1.2); Field measurements and data assimilation (BOK-1.3); Countermeasures in agriculture and forestry (BOK-1.4); Emergency monitoring in theNordic and Baltic Sea countries (BOK-1.5); and Nuclear exercises (BOK-1.6). For each sub-project, the project...

  9. THE DEVELOPMENT OF SUSTAINABLE CROPPING SYSTEMS IN THE HIGHLANDS OF SOUTH-EAST ASIA: GENERAL LESSONS FOR DEVELOPMENT PROJECTS

    Directory of Open Access Journals (Sweden)

    Michael A. Fullen

    2005-05-01

    Full Text Available Soil conservation in the highlands of South-East Asia is essential for sustainable agro-environmental development. The effectiveness of soil conservation treatments developed in runoff plots was investigated in farmer-managed plots on a natural catchment. This wasachieved by the development and scientific evaluation of modified and novel cropping practices in a representative highland catchment in Yunnan Province, China. Wang Jia Catchment covers 40.1 hectares near Kedu, in Xundian County, north-east Yunnan (25o28'N, 102o53'E. The initial project consisted of an evaluation of the effects of modified cropping practices on maize productivity and soil properties. This programme was extended to investigate ways of increasing the productivity of maize, wheat and soybean on fragile slopes in a sustainable and environmentally-friendly way. The approach incorporates modified and novel agronomic and soil conservation measures, with the evaluation of their agricultural, environmental and socio-economic impacts using multidisciplinary approaches. This European Union funded project involved an international research team from Belgium, China, Ireland, Thailand and the U.K. Five co-ordinated work packages were implemented. Involving: (1 Background agricultural and environmental assessment of Wang Jia Catchment. (2Implementation and evaluation of modified and novel cropping systems for wheat, maize and soybean in the catchment. (3 Cost-benefit analyses of the socio-economic impacts of the changed cropping practices. (4 Comparative scientific evaluation of the cropping techniques in the highlands of northern Thailand. (5 Dissemination of project outcomes and establishment of training programmes for best practice in highland rural development. The lessons of the Project for promoting sustainable agro-environmental development in tropical and subtropical highlands include: (1 Recognizing the importance of both ‘north-south’ and ‘south-south’ co

  10. Final report from VFL Technologies for the pilot-scale thermal treatment of Lower East Fork Poplar Creek floodplain soils. LEFPC appendices. Volume 6. Appendix VI-X

    International Nuclear Information System (INIS)

    1994-09-01

    This final report from VFL Technologies for the pilot-scale thermal treatment of lower East Fork Poplar Creek floodplain soils dated September 1994 contains LEFPC Appendices, Volume 6, Appendix VI - X. These appendices cover the following areas: chain of custody, miscellaneous process calculations (residence time and orifice plate calculations), waste management (mercury and radiation confirmatory testing before and after final verification run), health and safety (training, respirator fit test and radiation work permits), and transportation (soil receipt documentation)

  11. Energy Storage and Distributed Energy Generation Project, Final Project Report

    Energy Technology Data Exchange (ETDEWEB)

    Schwank, Johannes; Mader, Jerry; Chen, Xiaoyin; Mi, Chris; Linic, Suljo; Sastry, Ann Marie; Stefanopoulou, Anna; Thompson, Levi; Varde, Keshav

    2008-03-31

    This report serves as a Final Report under the “Energy Storage and Distribution Energy Generation Project” carried out by the Transportation Energy Center (TEC) at the University of Michigan (UM). An interdisciplinary research team has been working on fundamental and applied research on: -distributed power generation and microgrids, -power electronics, and -advanced energy storage. The long-term objective of the project was to provide a framework for identifying fundamental research solutions to technology challenges of transmission and distribution, with special emphasis on distributed power generation, energy storage, control methodologies, and power electronics for microgrids, and to develop enabling technologies for novel energy storage and harvesting concepts that can be simulated, tested, and scaled up to provide relief for both underserved and overstressed portions of the Nation’s grid. TEC’s research is closely associated with Sections 5.0 and 6.0 of the DOE "Five-year Program Plan for FY2008 to FY2012 for Electric Transmission and Distribution Programs, August 2006.”

  12. Decontamination and decommissioning of the Argonne Thermal Source Reactor at Argonne National Laboratory - East project final report

    International Nuclear Information System (INIS)

    Fellhauer, C.; Garlock, G.; Mathiesen, J.

    1998-01-01

    The ATSR D and D Project was directed toward the following goals: (1) Removal of radioactive and hazardous materials associated with the ATSR Reactor facility; (2) Decontamination of the ATSR Reactor facility to unrestricted use levels; and (3)Documentation of all project activities affecting quality (i.e., waste packaging, instrument calibration, audit results, and personnel exposure). These goals had been set in order to eliminate the radiological and hazardous safety concerns inherent in the ATSR Reactor facility and to allow, upon completion of the project, unescorted and unmonitored access to the area. The reactor aluminum, reactor lead, graphite piles in room E-111, and the contaminated concrete in room E-102 were the primary areas of concern. NES, Incorporated (Danbury, CT) characterized the ATSR Reactor facility from January to March 1998. The characterization identified a total of thirteen radionuclides, with a total activity of 64.84 mCi (2.4 GBq). The primary radionuclides of concern were Co 60 , Eu 152 , Cs 137 , and U 238 . No additional radionuclides were identified during the D and D of the facility. The highest dose rates observed during the project were associated with the reactor tank and shield tank. Contact radiation levels of 30 mrem/hr (0.3 mSv/hr) were measured on reactor internals during dismantlement of the reactor. A level of 3 mrem/hr (0.03 mSv/hr) was observed in a small area (hot spot) in room E-102. DOE Order 5480.2A establishes the maximum whole body exposure for occupational workers at 5 rem/yr (50 mSv/yr); the administrative limit at ANL-E is 1 rem/yr (10 mSv/yr)

  13. Tropical cyclones in the Bay of Bengal and extreme sea-level projections along the east coast of India in a future climate scenario

    Digital Repository Service at National Institute of Oceanography (India)

    Unnikrishnan, A.S.; RameshKumar, M.R.; Sindhu, B.

    (2071– 2100), A2. The analysis showed an increase in the frequency of cyclones in the Bay of Bengal during the late monsoon (August and September) in the A2 scenario compared to the baseline scenario. Extreme sea-level projections along the east coast...

  14. Nuclear emergency preparedness. Final report of the Nordic nuclear safety research project BOK-1

    Energy Technology Data Exchange (ETDEWEB)

    Lauritzen, Bent [Risoe National Lab., Roskilde (Denmark)

    2002-02-01

    Final report of the Nordic Nuclear Safety Research project BOK-1. The BOK-1 project, 'Nuclear Emergency Preparedness', was carried out in 1998-2001 with participants from the Nordic and Baltic Sea regions. The project consists of six sub-projects: Laboratory measurements and quality assurance (BOK-1.1); Mobile measurements and measurement strategies (BOK-1.2); Field measurement and data assimilation (BOK-1.3); Countermeasures in agriculture and forestry (BOK-1.4); Emergency monitoring in the Nordic and Baltic Sea countries (BOK-1.5); and Nuclear exercises (BOK-1.6). For each sub-project, the project outline, objectives and organization are described and main results presented. (au)

  15. Nuclear emergency preparedness. Final report of the Nordic nuclear safety research project BOK-1

    International Nuclear Information System (INIS)

    Lauritzen, Bent

    2002-02-01

    Final report of the Nordic Nuclear Safety Research project BOK-1. The BOK-1 project, 'Nuclear Emergency Preparedness', was carried out in 1998-2001 with participants from the Nordic and Baltic Sea regions. The project consists of six sub-projects: Laboratory measurements and quality assurance (BOK-1.1); Mobile measurements and measurement strategies (BOK-1.2); Field measurement and data assimilation (BOK-1.3); Countermeasures in agriculture and forestry (BOK-1.4); Emergency monitoring in the Nordic and Baltic Sea countries (BOK-1.5); and Nuclear exercises (BOK-1.6). For each sub-project, the project outline, objectives and organization are described and main results presented. (au)

  16. SPEAR 3 Upgrade Project: The Final Year

    International Nuclear Information System (INIS)

    Hettel, R

    2004-01-01

    During April, 2003, the SPEAR 2 storage ring, which served the high energy physics community from 1972 to 1987, and the synchrotron radiation community for an additional 15 years, was removed from its shielding tunnel in order to install the new 3-GeV, 500-mA SPEAR 3 light source. From May to November, SSRL will excavate the tunnel floor and pour a new concrete floor, and then install pre-assembled girders holding magnets, copper vacuum chambers, PEP-II-style rf cavities, and beam line front end components. At the same time, power supply, instrumentation and control, and other ancillary systems will be configured, leading to a commissioning period beginning in November 2003. The progress of accelerator component implementation and installation during the final year of the project will be reviewed

  17. Final project report: TA-35 Los Alamos Power Reactor Experiment No. II (LAPRE II) decommissioning project

    International Nuclear Information System (INIS)

    Montoya, G.M.

    1993-02-01

    This final report addresses the decommissioning of the LAPRE II Reactor, safety enclosure, fuel reservoir tanks, emergency fuel recovery system, primary pump pit, secondary loop, associated piping, and the post-remediation activities. Post-remedial action measurements are also included. The cost of the project including, Phase I assessment and Phase II remediation was approximately $496K. The decommissioning operation produced 533 M 3 of mixed waste

  18. Analysis of final year DVM research projects submitted to the Faculty ...

    African Journals Online (AJOL)

    Central Research Laboratory

    in the library. The essence of this study is to guide prospective final year students and researchers in the choice of research topics as this will help in saving their time. It will also ... and Undergraduate projects of the same department in 2002. Obajemu (1999) also .... majority of the rural people. The distribution by animal ...

  19. New constraints on the structure and dynamics of the East Antarctic Ice Sheet from the joint IPY/Ice Bridge ICECAP aerogeophysical project

    Science.gov (United States)

    Blankenship, D. D.; Young, D. A.; Siegert, M. J.; van Ommen, T. D.; Roberts, J. L.; Wright, A.; Warner, R. C.; Holt, J. W.; Young, N. W.; Le Meur, E.; Legresy, B.; Cavitte, M.; Icecap Team

    2010-12-01

    Ice within marine basins of East Antarctica, and their outlets, represent the ultimate limit on sea level change. The region of East Antarctica between the Ross Sea and Wilkes Land hosts a number of major basin, but has been poorly understood. Long range aerogeophysics from US, Australian and French stations, with significant British and IceBridge support, has, under the banner of the ICECAP project, greatly improved our knowledge of ice thickness, surface elevation, and crustal structure of the Wilkes and Aurora Subglacial Basins, as well as the Totten Glacier, Cook Ice Shelf, and Byrd Glacier. We will discuss the evolution of the Wilkes and Aurora Subglacial Basins, new constraints on the geometry of the major outlet glaciers, as well as our results from surface elevation change measurements over dynamic regions of the ice sheet. We will discuss the implications of our data for the presence of mid Pleistocene ice in central East Antarctica. Future directions for ICECAP will be discussed.

  20. Final project report

    Energy Technology Data Exchange (ETDEWEB)

    Nitin S. Baliga and Leroy Hood

    2008-11-12

    The proposed overarching goal for this project was the following: Data integration, simulation and visualization will facilitate metabolic and regulatory network prediction, exploration, and formulation of hypotheses. We stated three specific aims to achieve the overarching goal of this project: (1) Integration of multiple levels of information such as mRNA and protein levels, predicted protein-protein interactions/associations and gene function will enable construction of models describing environmental response and dynamic behavior. (2) Flexible tools for network inference will accelerate our understanding of biological systems. (3) Flexible exploration and queries of model hypotheses will provide focus and reveal novel dependencies. The underlying philosophy of these proposed aims is that an iterative cycle of experiments, experimental design, and verification will lead to a comprehensive and predictive model that will shed light on systems level mechanisms involved in responses elicited by living systems upon sensing a change in their environment. In the previous years report we demonstrated considerable progress in development of data standards, regulatory network inference and data visualization and exploration. We are pleased to report that several manuscripts describing these procedures have been published in top international peer reviewed journals including Genome Biology, PNAS, and Cell. The abstracts of these manuscripts are given and they summarize our accomplishments in this project.

  1. Wabash River Coal Gasification Repowering Project: A DOE Assessment; FINAL

    International Nuclear Information System (INIS)

    National Energy Technology Laboratory

    2002-01-01

    The goal of the U.S. Department of Energy (DOE) Clean Coal Technology Program (CCT) is to furnish the energy marketplace with a number of advanced, more efficient, and environmentally responsible coal utilization technologies through demonstration projects. These projects seek to establish the commercial feasibility of the most promising advanced coal technologies that have developed beyond the proof-of-concept stage. This document serves as a DOE post-project assessment (PPA) of a project selected in CCT Round IV, the Wabash River Coal Gasification Repowering (WRCGR) Project, as described in a Report to Congress (U.S. Department of Energy 1992). Repowering consists of replacing an existing coal-fired boiler with one or more clean coal technologies to achieve significantly improved environmental performance. The desire to demonstrate utility repowering with a two-stage, pressurized, oxygen-blown, entrained-flow, integrated gasification combined-cycle (IGCC) system prompted Destec Energy, Inc., and PSI Energy, Inc., to form a joint venture and submit a proposal for this project. In July 1992, the Wabash River Coal Gasification Repowering Project Joint Venture (WRCGRPJV, the Participant) entered into a cooperative agreement with DOE to conduct this project. The project was sited at PSI Energy's Wabash River Generating Station, located in West Terre Haute, Indiana. The purpose of this CCT project was to demonstrate IGCC repowering using a Destec gasifier and to assess long-term reliability, availability, and maintainability of the system at a fully commercial scale. DOE provided 50 percent of the total project funding (for capital and operating costs during the demonstration period) of$438 million. Construction for the demonstration project was started in July 1993. Pre-operational tests were initiated in August 1995, and construction was completed in November 1995. Commercial operation began in November 1995, and the demonstration period was completed in December

  2. Environmental Economics Research Competition for the Middle East ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    , to extend its work in environmental economics by supporting a series of small research projects in the Middle East and North Africa. Project proposals will be solicited through two competitions: one with and one without a specific theme.

  3. TESTING TREE-CLASSIFIER VARIANTS AND ALTERNATE MODELING METHODOLOGIES IN THE EAST GREAT BASIN MAPPING UNIT OF THE SOUTHWEST REGIONAL GAP ANALYSIS PROJECT (SW REGAP)

    Science.gov (United States)

    We tested two methods for dataset generation and model construction, and three tree-classifier variants to identify the most parsimonious and thematically accurate mapping methodology for the SW ReGAP project. Competing methodologies were tested in the East Great Basin mapping un...

  4. Enewetak radiological support project. Final report

    International Nuclear Information System (INIS)

    Friesen, B.

    1982-09-01

    From 1972 through 1980, the Department of Energy acted in an advisory role to the Defense Nuclear Agency during planning for and execution of the cleanup of Enewetak Atoll. The Nevada Operations Office of the Department of Energy was responsible for the radiological characterization of the atoll and for certification of radiological condition of each island upon completion of the project. In-situ measurements of gamma rays emitted by americium-241 were utilized along with wet chemistry separation of plutonium from soil samples to identify and delineate surface areas requiring removal of soil. Military forces removed over 100,000 cubic yards of soil from the surface of five islands and deposited this material in a crater remaining from the nuclear testing period. Subsurface soil was excavated and removed from several locations where measurements indicated the presence of radionuclides above predetermined criteria. The methodologies of data acquisition, analysis and interpretation are described and detailed results are provided in text, figures and microfiche. The final radiological condition of each of 43 islets is reported

  5. Final disposal of radioactive wastes in Switzerland: concept and overview of Project Guarantee 1985

    International Nuclear Information System (INIS)

    Anon.

    1985-01-01

    The validity of the operational licences of the existing Swiss nuclear power plants (NPP) Beznau I and II, Muehleberg, Goesgen and Leibstadt after 31st. December 1985 is, because of official requirements, dependent on the demonstration of permanent, safe management and final disposal of radioactive waste. For this purpose, the NPP companies have to prepare a so-called guarantee project and present this to the Bundesrat for review. The appropriate investigations and research have been carried out by Nagra (National Cooperative for the Storage of Radioactive Waste). The 1985 Project Gewaehr (Guarantee) is described in an eight volume report NGB 85-01 to 85-08 and individual research projects are reported on in separate NTB-series reference reports. The present volume NGB 85-01 takes the form of a self-contained project overview in which the concepts for nuclear waste management are described, the contents of the remaining volumes NGB 85-02 to 85-08 are summarized and Project conclusions are drawn from Project Gewaehr 1985. Project Gewaehr 1985 covers two repository types: Type C repository for high-level and certain alpha-containing intermediate-level waste, and Type B repository for all remaining intermediate- and low-level waste. The Project shows in detail that technical feasibility of final disposal can be assumed given presently available methods, that the technical safety barriers show a high level of efficiency and that suitable geological options are available to ensure long-term safety in Switzerland as the concept is defined by official requirements. The Project safety analyses show that the chosen disposal concepts assure the protection of mankind and the environment under all realistically anticipated conditions

  6. Final Technical Report - Kotzebue Wind Power Project - Volume II

    Energy Technology Data Exchange (ETDEWEB)

    Rana Zucchi, Global Energy Concepts, LLC; Brad Reeve, Kotzebue Electric Association; DOE Project Officer - Doug Hooker

    2007-10-31

    The Kotzebue Wind Power Project is a joint undertaking of the U.S. Department of Energy (DOE); Kotzebue Electric Association (KEA); and the Alaska Energy Authority (AEA). The goal of the project is to develop, construct, and operate a wind power plant interconnected to a small isolated utility grid in an arctic climate in Northwest Alaska. The primary objective of KEA’s wind energy program is to bring more affordable electricity and jobs to remote Alaskan communities. DOE funding has allowed KEA to develop a multi-faceted approach to meet these objectives that includes wind project planning and development, technology transfer, and community outreach. The first wind turbines were installed in the summer of 1997 and the newest turbines were installed in the spring of 2007. The total installed capacity of the KEA wind power project is 1.16 MW with a total of 17 turbines rated between 65 kW and 100 kW. The operation of the wind power plant has resulted in a wind penetration on the utility system in excess of 35% during periods of low loads. This document and referenced attachments are presented as the final technical report for the U.S. Department of Energy (DOE) grant agreement DE-FG36-97GO10199. Interim deliverables previously submitted are also referenced within this document and where reasonable to do so, specific sections are incorporated in the report or attached as appendices.

  7. Location of a new ice core site at Talos Dome (East Antarctica

    Directory of Open Access Journals (Sweden)

    I. Tabacco

    2006-06-01

    Full Text Available In the frame of glaciology and palaeoclimate research, Talos Dome (72°48lS; 159°06lE, an ice dome on the East Antarctic plateau, represents the new selected site for a new deep ice core drilling. The increasing interest in this region is due to the fact that the ice accumulation is higher here than in other domes in East Antarctica. A new deep drilling in this site could give important information about the climate changes near the coast. Previous papers showed that the dome summit is situated above a sloped bedrock. A new position on a relatively flat bedrock 5-6 km far from here in the SE direction was defined as a possible new ice core site for an European (Italy, France, Swiss and United Kingdom drilling project named as TALDICE (TALos Dome Ice Core Project. This point, named as ID1 (159°11l00mE; 72°49l40mS, became the centre of the Radio Echo Sounding (RES flight plan during the 2003 Italian Antarctic expedition, with the aim of confirming the new drilling site choice. In this paper 2001 and 2003 RES data sets have been used to draw a better resolution of ice thickness, bottom morphology and internal layering of a restricted area around the dome. Based on the final results, point ID1 has been confirmed as the new coring site. Finally, the preliminary operations about the installation of the summer ice core camp (TALDICE at ID1 site carried out during the XX Italian Antarctic expedition (November 2004-December 2005 are briefly described.

  8. Final Project Report

    Energy Technology Data Exchange (ETDEWEB)

    Small, R. Justin [Woods Hole Oceanographic Institution, MA (United States); Bryan, Frank [Woods Hole Oceanographic Institution, MA (United States); Tribbia, Joseph [Woods Hole Oceanographic Institution, MA (United States); Park, Sungsu [Woods Hole Oceanographic Institution, MA (United States); Dennis, John [Woods Hole Oceanographic Institution, MA (United States); Saravanan, R. [Woods Hole Oceanographic Institution, MA (United States); Schneider, Niklas [Woods Hole Oceanographic Institution, MA (United States); Kwon, Young-Oh [Woods Hole Oceanographic Institution, MA (United States)

    2015-06-01

    Most climate models are currently run with grid spacings of around 100km, which, with today’s computing power, allows for long (up to 1000 year) simulations, or ensembles of simulations to explore climate change and variability. However this grid spacing does not resolve important components of the weather/climate system such as atmospheric fronts and mesoscale systems, and ocean boundary currents and eddies. The overall aim of this project has been to look at the effect of these small-scale features on the weather/climate system using a suite of high and low resolution climate models, idealized models and observations. This project was only possible due to the highly scalable aspect of the CAM Spectral Element dynamical core, and the significant resources allocated at Yellowstone and NERSC for which we are grateful.

  9. Blue Creek Winter Range: Wildlife Mitigation Project. Final environmental assessment

    International Nuclear Information System (INIS)

    1994-11-01

    Bonneville Power Administration (BPA) proposes to fund that portion of the Washington Wildlife Agreement pertaining to the Blue Creek Winter Range Wildlife Mitigation Project (Project) in a cooperative effort with the Spokane Tribe, Upper Columbia United Tribes, and the Bureau of Indian Affairs (BIA). If fully implemented, the proposed action would allow the sponsors to protect and enhance 2,631 habitat units of big game winter range and riparian shrub habitat on 2,185 hectares (5,400 acres) of Spokane Tribal trust lands, and to conduct long term wildlife management activities within the Spokane Indian Reservation project area. This Final Environmental Assessment (EA) examines the potential environmental effects of securing land and conducting wildlife habitat enhancement and long term management activities within the boundaries of the Spokane Indian Reservation. Four proposed activities (habitat protection, habitat enhancement, operation and maintenance, and monitoring and evaluation) are analyzed. The proposed action is intended to meet the need for mitigation of wildlife and wildlife habitat adversely affected by the construction of Grand Coulee Dam and its reservoir

  10. Klondike III/Biglow Canyon Wind Integration Project; Final Environmental Impact Statement, September 2006.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration

    2006-09-01

    BPA has been asked by PPM Energy, Inc. to interconnect 300 megawatts (MW) of electricity generated from the proposed Klondike III Wind Project to the Federal Columbia River Transmission System. Orion Energy LLC has also asked BPA to interconnect 400 MW of electricity from its proposed Biglow Canyon Wind Farm, located north and east of the proposed Klondike III Wind Project. (Portland General Electric recently bought the rights to develop the proposed Biglow Canyon Wind Farm from Orion Energy, LLC.) Both wind projects received Site Certificates from the Oregon Energy Facility Siting Council on June 30, 2006. To interconnect these projects, BPA would need to build and operate a 230-kV double-circuit transmission line about 12 miles long, expand one substation and build one new substation. The wind projects would require wind turbines, substation(s), access roads, and other facilities. Two routes for the transmission line are being considered. Both begin at PPM's Klondike Schoolhouse Substation then travel north (Proposed Action) or north and westerly (Middle Alternative) to a new BPA 230-kV substation next to BPA's existing John Day 500-kV Substation. BPA is also considering a No Action Alternative in which BPA would not build the transmission line and would not interconnect the wind projects. The proposed BPA and wind projects would be located on private land, mainly used for agriculture. If BPA decides to interconnect the wind projects, construction of the BPA transmission line and substation(s) could commence as early as the winter of 2006-07. Both wind projects would operate for much of each year for at least 20 years. The proposed projects would generally create no or low impacts. Wildlife resources and local visual resources are the only resources to receive an impact rating other than ''none'' or ''low''. The low to moderate impacts to wildlife are from the expected bird and bat mortality and the cumulative

  11. Next Generation Nuclear Plant (NGNP) Prismatic HTGR Conceptual Design Project - Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Saurwein, John

    2011-07-15

    This report is the Final Technical Report for the Next Generation Nuclear Plant (NGNP) Prismatic HTGR Conceptual Design Project conducted by a team led by General Atomics under DOE Award DE-NE0000245. The primary overall objective of the project was to develop and document a conceptual design for the Steam Cycle Modular Helium Reactor (SC-MHR), which is the reactor concept proposed by General Atomics for the NGNP Demonstration Plant. The report summarizes the project activities over the entire funding period, compares the accomplishments with the goals and objectives of the project, and discusses the benefits of the work. The report provides complete listings of the products developed under the award and the key documents delivered to the DOE.

  12. Next Generation Nuclear Plant (NGNP) Prismatic HTGR Conceptual Design Project - Final Technical Report

    International Nuclear Information System (INIS)

    Saurwein, J.

    2011-01-01

    This report is the Final Technical Report for the Next Generation Nuclear Plant (NGNP) Prismatic HTGR Conceptual Design Project conducted by a team led by General Atomics under DOE Award DE-NE0000245. The primary overall objective of the project was to develop and document a conceptual design for the Steam Cycle Modular Helium Reactor (SC-MHR), which is the reactor concept proposed by General Atomics for the NGNP Demonstration Plant. The report summarizes the project activities over the entire funding period, compares the accomplishments with the goals and objectives of the project, and discusses the benefits of the work. The report provides complete listings of the products developed under the award and the key documents delivered to the DOE.

  13. Final predictions of ambient conditions along the east-west cross drift using the 3-D UZ site-scale model. Level 4 milestone SP33ABM4

    International Nuclear Information System (INIS)

    Ritcey, A.C.; Sonnenthal, E.L.; Wu, Y.S.; Haukwa, C.; Bodvarsson, G.S.

    1998-01-01

    In 1998, the Yucca Mountain Site Characterization Project (YMP) is expected to continue construction of an East-West Cross Drift. The 5-meter diameter drift will extend from the North Ramp of the Exploratory Studies Facility (ESF), near Station 19+92, southwest through the repository block, and over to and through the Solitario Canyon Fault. This drift is part of a program designed to enhance characterization of Yucca Mountain and to complement existing surface-based and ESF testing studies. The objective of this milestone is to use the three-dimensional (3-D) unsaturated zone (UZ) site-scale model to predict ambient conditions along the East-West Cross Drift. These predictions provide scientists and engineers with a priori information that can support design and construction of the East-West Cross Drift and associated testing program. The predictions also provide, when compared with data collected after drift construction, an opportunity to test and verify the calibration of the 3-D UZ site-scale model

  14. Final report on Paradox Basin/Gulf Interior: Regulatory project management

    International Nuclear Information System (INIS)

    1986-12-01

    This final report on the Regulatory Project Manager (RPM) program begins with a discussion of the key products produced during the 9-year effort and then focuses on the work performed in the major disciplines. The report then discusses the management of the work effort and the Quality Assurance (QA) program. It concludes with a brief discussion of the records turned over to the Office of Nuclear Waste Isolation (ONWI) at the conclusion of the work. 14 figs., 14 tabs

  15. The impact of project marketing on the projects finality

    Directory of Open Access Journals (Sweden)

    Oxana SAVCIUC

    2015-06-01

    Full Text Available In the last years we assist at the level of the Republic of Moldova and also at international level at a trend to offer financial support with a special focus on project-based funding. Once with the appearance and development of the project concept, other related concepts are being developed such as project management or newly, we can also speak about the projects marketing. Until recently, the product marketing was intensely discussed; concepts such as services marketing appeared afterwards, but also the specific marketing for various branches, such as agromarketing, political marketing, etc. Given that fact that the projects are a product / service itself, at the moment, more and more often projects marketing is discussed.

  16. Automated metadata--final project report

    International Nuclear Information System (INIS)

    Schissel, David

    2016-01-01

    This report summarizes the work of the Automated Metadata, Provenance Cataloging, and Navigable Interfaces: Ensuring the Usefulness of Extreme-Scale Data Project (MPO Project) funded by the United States Department of Energy (DOE), Offices of Advanced Scientific Computing Research and Fusion Energy Sciences. Initially funded for three years starting in 2012, it was extended for 6 months with additional funding. The project was a collaboration between scientists at General Atomics, Lawrence Berkley National Laboratory (LBNL), and Massachusetts Institute of Technology (MIT). The group leveraged existing computer science technology where possible, and extended or created new capabilities where required. The MPO project was able to successfully create a suite of software tools that can be used by a scientific community to automatically document their scientific workflows. These tools were integrated into workflows for fusion energy and climate research illustrating the general applicability of the project's toolkit. Feedback was very positive on the project's toolkit and the value of such automatic workflow documentation to the scientific endeavor.

  17. Final project report, TA-35 Los Alamos Power Reactor Experiment No. II (LAPRE II) decommissioning project

    International Nuclear Information System (INIS)

    Montoya, G.M.

    1992-01-01

    This final report addresses the decommissioning of the LAPRE II Reactor, safety enclosure, fuel reservoir tanks, emergency fuel recovery system, primary pump pit, secondary loop, associated piping, and the post-remediation activities. Post-remedial action measurements are also included. The cost of the project, including Phase I assessment and Phase II remediation was approximately $496K. The decommissioning operation produced 533 m 3 of low-level solid radioactive waste and 5 m 3 of mixed waste

  18. Description of the supporting factors of final project in Mathematics and Natural Sciences Faculty of Syiah Kuala University with multiple correspondence analysis

    Science.gov (United States)

    Rusyana, Asep; Nurhasanah; Maulizasari

    2018-05-01

    Syiah Kuala University (Unsyiah) is hoped to have graduates who are qualified for working or creating a field of work. A final project course implementation process must be effective. This research uses data from the evaluation conducted by Mathematics and Natural Sciences Faculty (FMIPA) of Unsyiah. Some of the factors that support the completion of the final project are duration, guidance, the final project seminars, facility, public impact, and quality. This research aims to know the factors that have a relationship with the completion of the final project and identify similarities among variables. The factors that support the completion of the final project at every study program in FMIPA are (1) duration, (2) guidance and (3) facilities. These factors are examined for the correlations by chi-square test. After that, the variables are analyzed with multiple correspondence analysis. Based on the plot of correspondence, the activities of the guidance and facilities in Informatics Study Program are included in the fair category, while the guidance and facilities in the Chemistry are included in the best category. Besides that, students in Physics can finish the final project with the fastest completion duration, while students in Pharmacy finish for the longest time.

  19. Middle East natural gas - getting it to markets

    International Nuclear Information System (INIS)

    Skinner, R.

    1996-01-01

    Middle East gas reserves, production, and consumption were presented graphically, along with the demand for 'piped' or liquefied natural gas in the Middle East itself, in Asia and in Europe. The European gas market outlook was examined, taking into account economic growth, EEC restructuring, crude oil prices and their effects on net-backs, deregulation and competitive grid-based energy, upstream and midstream investments under conditions of price uncertainty, and environmental and social influences. Middle East pipeline proposals (17 projects) for a total of 34,943 kilometres of pipeline, were reviewed. The general conclusion was that (1) the Middle East has lots of gas, (2) both Asia and Europe will be substantial markets for Middle East LNG despite the 'tyranny of distance', and (3) pipelines to these markets will be built in the longer-term. tabs., figs

  20. Puget Sound Tidal Energy In-Water Testing and Development Project Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Collar, Craig W

    2012-11-16

    others. All required permit and license applications were completed and submitted under this award, including a Final License Application for a pilot hydrokinetic license from the Federal Energy Regulatory Commission. The tasks described above have brought the project through all necessary requirements to construct a tidal pilot project in Admiralty Inlet with the exception of final permit and license approvals, and the selection of a general contractor to perform project construction.

  1. 'Advancement of KHPS to DOE TRL 7/8' Project - Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Adonizio, Mary Ann [Verdant Power Inc., New York, NY (United States); Corren, Dean [Verdant Power Inc., New York, NY (United States); Smith, Ron [Verdant Power Inc., New York, NY (United States); Colby, Jonathan [Verdant Power Inc., New York, NY (United States); Hernandez, Aaron [Verdant Power Inc., New York, NY (United States)

    2016-04-08

    Final Report describing activities performed under the 'Advancement of the KHPS to DOE TRL 7/8' project, including the development of critical component test protocols, testing and analysis of the Gen5 KHPS main shaft seal, and continuing compliance work on approved operational environmental monitoring plans in anticipation of KHPS turbine installation at Verdant Power's Roosevelt Island Tidal Energy (RITE) Project site in New York, NY.

  2. East Bay Marina Olympia, Thurston County, Washington. Final Detailed Project Report, Section 107, 1960 River and Harbor Act and Environmental Impact Statement

    Science.gov (United States)

    1980-12-01

    the Pacific Coast. Thus, transplanting of plants from the Nisqually marshes or other locations nearby in southern Puget Sound would appear to be the...However, transplants bring quicker establishment and are more tolerant of stressful conditions, more vigorous, and tend to give more permanent results. 19...SHEET 7 of 101 G-22 I \\i \\ LLA PAR-L ;,ki ! 4 L ~fl~i~\\\\ - L \\ ; I0 L \\;x M’ PSEN-PL-NC-79-I UL (EAST BAY-OCYMPIA) i% 4V4 OSEO DREOGING

  3. Final Report for NIREC Renewable Energy Research & Development Project

    Energy Technology Data Exchange (ETDEWEB)

    Borland, Walt [Nevada Institute for Renewable Energy Commercialization (NIREC), Las Vegas, NV (United States)

    2017-05-02

    This report is a compilation of progress reports and presentations submitted by NIREC to the DOE’s Solar Energy Technologies Office for award number DE-FG36-08GO88161. This compilation has been uploaded to OSTI by DOE as a substitute for the required Final Technical Report, which was not submitted to DOE by NIREC or received by DOE. Project Objective: The primary goal of NIREC is to advance the transformation of the scientific innovation of the institutional partner’s research in renewable energy into a proof of the scientific concept eventually leading to viable businesses with cost effective solutions to accelerate the widespread adoption of renewable energy. NIREC will a) select research projects that are determined to have significant commercialization potential as a result of vetting by the Technology and commercialization Advisory Board, b) assign an experienced Entrepreneur-in-Residence (EIR) to each manage the scientific commercialization-preparedness process, and c) facilitate connectivity with venture capital and other private-sector capital sources to fund the rollout, scaling and growth of the resultant renewable energy business.

  4. Northeast Oregon Hatchery Project, Conceptual Design Report, Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Watson, Montgomery (Montgomery Watson, Bellevue, WA)

    1995-03-01

    This report presents the results of site analysis for the Bonneville Power Administration Northeast Oregon Hatchery Project. The purpose of this project is to provide engineering services for the siting and conceptual design of hatchery facilities for the Bonneville Power Administration. The hatchery project consists of artificial production facilities for salmon and steelhead to enhance production in three adjacent tributaries to the Columbia River in northeast Oregon: the Grande Ronde, Walla Walla, and Imnaha River drainage basins. Facilities identified in the master plan include adult capture and holding facilities; spawning incubation, and early rearing facilities; full-term rearing facilities; and direct release or acclimation facilities. The evaluation includes consideration of a main production facility for one or more of the basins or several smaller satellite production facilities to be located within major subbasins. The historic and current distribution of spring and fall chinook salmon and steelhead was summarized for the Columbia River tributaries. Current and future production and release objectives were reviewed. Among the three tributaries, forty seven sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed.

  5. Northeast Oregon Hatchery Project conceptual design report. Final report

    International Nuclear Information System (INIS)

    1995-03-01

    This report presents the results of site analysis for the Bonneville Power Administration Northeast Oregon Hatchery Project. The purpose of this project is to provide engineering services for the siting and conceptual design of hatchery facilities for the Bonneville Power Administration. The hatchery project consists of artificial production facilities for salmon and steelhead to enhance production in three adjacent tributaries to the Columbia River in northeast Oregon: the Grande Ronde, Walla Walla, and Imnaha River drainage basins. Facilities identified in the master plan include adult capture and holding facilities; spawning incubation, and early rearing facilities; full-term rearing facilities; and direct release or acclimation facilities. The evaluation includes consideration of a main production facility for one or more of the basins or several smaller satellite production facilities to be located within major subbasins. The historic and current distribution of spring and fall chinook salmon and steelhead was summarized for the Columbia River tributaries. Current and future production and release objectives were reviewed. Among the three tributaries, forty seven sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed

  6. Manitoba Motor Dealers Association pilot project : final report

    International Nuclear Information System (INIS)

    2006-08-01

    This report described a 3-month pilot project conducted by EnerGuide for Vehicles in collaboration with the Manitoba Motor Dealers Association (MMDA) to increase dealership and consumer awareness of vehicle impacts on climate change. The project also aimed to engage MMDA's members in helping to promote and distribute information on fuel efficient vehicles and fuel efficient driving habits. Program tools in both the dealership showroom as well as service areas were used. Objectives of the project also included gaining public opinion research (POR) information regarding the impact of program tools; gaining feedback from new car dealers regarding the success of the project; gauging customer perceptions of the importance of fuel efficiency when selecting a new vehicle; determining whether or not drivers verify tire pressure on their vehicles; determining whether or not drivers incorporate energy efficient driving habits; and gauging customer perceptions regarding the importance of incorporating behaviours to improve fuel efficiency. The study used a mixed methodology of online and telephone surveys. A total of 41 dealerships participated in the project. The final sample of surveys consisted of 1926 customer records. The total overall number of completed interviews was 463. Results indicated that most dealers believed the campaign was a success, and that staff and customers learned about energy efficiency as a result of the campaign. Seventy-five per cent of dealers agreed that they would participate in future energy efficiency programs. Campaign materials and customer incentives were widely viewed as successful in raising awareness. Seven in 10 dealership customers recalled at least 1 of the promotional endeavours, and a large majority of customers indicated the information they saw at the dealership encouraged them to consider fuel efficiency when buying or maintaining a vehicle in the future. The majority of new customers considered fuel consumption to be the second

  7. Terahertz spectral signatures :measurement and detection LDRD project 86361 final report.

    Energy Technology Data Exchange (ETDEWEB)

    Wanke, Michael Clement; Brener, Igal; Lee, Mark

    2005-11-01

    LDRD Project 86361 provided support to upgrade the chemical and material spectral signature measurement and detection capabilities of Sandia National Laboratories using the terahertz (THz) portion of the electromagnetic spectrum, which includes frequencies between 0.1 to 10 THz. Under this project, a THz time-domain spectrometer was completed. This instrument measures sample absorption spectra coherently, obtaining both magnitude and phase of the absorption signal, and has shown an operating signal-to-noise ratio of 10{sub 4}. Additionally, various gas cells and a reflectometer were added to an existing high-resolution THz Fourier transform spectrometer, which greatly extend the functionality of this spectrometer. Finally, preliminary efforts to design an integrated THz transceiver based on a quantum cascade laser were begun.

  8. Middle East gas

    International Nuclear Information System (INIS)

    Thomas, V.

    2001-01-01

    Despite the significant contribution of the Middle East countries of Bahrain, Iran, Iraq, Kuwait, Qatar, Saudi Arabia and the United Arab Emirates in the Arabia Gulf to the world's oil output, they are placing increasing emphasis on natural gas as a source of exports and to fuel domestic economic growth. The region accounts for 35% of the world's proven gas resource base, with Iran and Qatar holding major reserves. The region is becoming increasingly important in global liquefied natural gas (LNG) trade and details of key LNG projects and the major players in this area are given; a key advantage is the region's position between the two main markets - the Asia Pacific and the Atlantic Basin. Brief details are also given of gas pipeline projects and gas-to-liquid (GTL) projects in the region

  9. INVESTIGATIVE RESEARCH PROJECTS RELATED TO THE TOHOKU EARTHQUAKE (THE GREAT EAST JAPAN EARTHQUAKE) CONDUCTED IN FUKUSHIMA.

    Science.gov (United States)

    Yamamoto, Toshiyuki; Hashimoto, Yasuhiro; Yoshida, Masayuki; Ohno, Kikuo; Ohto, Hitoshi; Abe, Masafumi

    2015-01-01

    On March 11(th) 2011, the Tohoku region of Japan was struck by catastrophic disasters. Thousands of people were killed due to a magnitude 9.0 earthquake and its subsequent tsunami. Furthermore, a serious nuclear crisis occurred in Fukushima Prefecture as a result of the disasters, and an emergency evacuation was ordered to people living near the nuclear power plants. There was a lot of anxiety regarding lost families as well as the influences of radioactivity on the health of people and their children. Based on these urgent and uncertain situations, a number of research projects were developed at many institutes both inside and outside Fukushima. We herein report the investigative research projects related to the Tohoku Earthquake (The Great East Japan Earthquake) conducted after the disasters. The research projects were reviewed by the Institutional Review Board in Fukushima Medical University during the two years following the disasters. The research projects conducted in universities other than Fukushima Medical University were also examined using questionnaire analysis. Among the research projects conducted in Fukushima Medical University (n=424), 7% (n=32) were disaster-related investigative research. The mean duration planned to pursue the projects was 25.5 months. Among these projects, those focusing on the health of Fukushima citizens were most common (n=9), followed by the influence of chronic exposure of radiation on chronic inflammatory disorders (n=6), and the mental health of Fukushima citizens (n=5). They were carefully reviewed for the purpose, suitability, and necessity from ethical as well as scientific viewpoints. The majority of the research projects focused on the effects of the Tohoku Earthquake and/or chronic exposure to low-dose radioactivity on the health of children and pregnant women, as well as on various disorders, such as mental health and chronic inflammatory diseases. On the other hand, among 58 projects we collected from 22

  10. Final Project Report

    DEFF Research Database (Denmark)

    Duer, Karsten

    1997-01-01

    The report summarizes the work that has been carried out within the project "B1 AEROGELS" as a part of the IEA SH&CP Task 18 "Advanced Glazing and Associated Materials For SolarAnd Building Applications". By providing at the same time thermal insulation and transparency the silica aerogel is a very...

  11. Final environmental impact statement Kenetech/PacifiCorp Windpower Project Carbon County, Wyoming

    International Nuclear Information System (INIS)

    1995-08-01

    The Draft and Final Environmental Impact Statements (DEIS and FEIS) assess the environmental consequences of a proposed windpower energy development in Carbon County, Wyoming. This abbreviated FEIS revises and supplements the DEIS for the project and addresses comments expressed for the DEIS. The proposed project entails the erection of approximately 1,390 wind turbine generators and associated facilities (e.g., roads, substations, distribution and communications lines) by KENETECH Windpower, Inc. A 230-kV transmission line would be built by PacifiCorp, Inc. to connect a proposed substation on Foote Creek Rim near Arlington to the Miner's substation near Hanna. The proposed project would use standard procedures as currently employed by other right-of-way projects, plus additional project-specific and site-specific mitigation measures to ensure that project impacts are minimized on all important resources. Impacts to most resources would be negligible to moderate during the life-of-project. Potentially significant impacts from the project include avian mortality; declining avian populations; threatened, endangered, candidate, and/or state sensitive species mortality and/or habitat loss; disturbance to nearby residents due to noise; changes in visual resources; disturbance of important Native American traditional sites; changes in plant community species composition due to snow redistribution; displacement of big game due to windfarm operation; and loss of sage grouse nesting habitat. The proposed project could also have numerous beneficial impacts including increased revenues generated by taxes, increased employment, and benefits derived from using a nonpolluting resource for electric power generation

  12. Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Schuur, Edward [Northern Arizona Univ., Flagstaff, AZ (United States); Luo, Yiqi [Univ. of Oklahoma, Norman, OK (United States)

    2016-12-01

    This final grant report is a continuation of the final grant report submitted for DE-SC0006982 as the Principle Investigator (Schuur) relocated from the University of Florida to Northern Arizona University. This report summarizes the original project goals, as well as includes new project activities that were completed in the final period of the project.

  13. Waste Management Plan for the Lower East Fork Poplar Creek Remedial Action Project Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-08-01

    The Lower East Fork Poplar Creek (LEFPC) Remedial Action project will remove mercury-contaminated soils from the floodplain of LEFPC, dispose of these soils at the Y-12 Landfill V, and restore the affected floodplain upon completion of remediation activities. This effort will be conducted in accordance with the Record of Decision (ROD) for LEFPC as a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) action. The Waste Management Plan addresses management and disposition of all wastes generated during the remedial action for the LEFPC Project Most of the solid wastes will be considered to be sanitary or construction/demolition wastes and will be disposed of at existing Y-12 facilities for those types of waste. Some small amounts of hazardous waste are anticipated, and the possibility of low- level or mixed waste exists (greater than 35 pCi/g), although these are not expected. Liquid wastes will be generated which will be sanitary in nature and which will be capable of being disposed 0214 of at the Oak Ridge Sewage Treatment Plant.

  14. Waste Management Plan for the Lower East Fork Poplar Creek Remedial Action Project Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-08-01

    The Lower East Fork Poplar Creek (LEFPC) Remedial Action project will remove mercury-contaminated soils from the floodplain of LEFPC, dispose of these soils at the Y-12 Landfill V, and restore the affected floodplain upon completion of remediation activities. This effort will be conducted in accordance with the Record of Decision (ROD) for LEFPC as a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) action. The Waste Management Plan addresses management and disposition of all wastes generated during the remedial action for the LEFPC Project Most of the solid wastes will be considered to be sanitary or construction/demolition wastes and will be disposed of at existing Y-12 facilities for those types of waste. Some small amounts of hazardous waste are anticipated, and the possibility of low- level or mixed waste exists (greater than 35 pCi/g), although these are not expected. Liquid wastes will be generated which will be sanitary in nature and which will be capable of being disposed 0214 of at the Oak Ridge Sewage Treatment Plant

  15. Resource Contingency Program - Oregon : Final Environmental Impact Statement, Hermiston Power Project.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-09-01

    The Bonneville Power Administration (BPA) has statutory responsibilities to supply electrical power to its utility, industrial, and other customers in the Pacific Northwest. In 1990, to cover the outer range of potential load growth with new resources, BPA embarked upon the Resource Contingency Program (RCP). Instead of buying or building generating plants now, BPA has purchased options to acquire power later, if and when it is needed. The decision to acquire any of these option energy projects to fulfill statutory supply obligations will be influenced by Federal system load growth, the outcome of BPA`s Business Plan, required operational changes in Columbia-Snake River Hydroelectric facilities, and the loss of major generating resources. In September 1993, three option development agreements were signed with three proposed natural gas-fired, combined cycle combustion turbine CT projects near Chehalis and Satsop, Washington, and near Hermiston, Oregon. Together these three projects could supply BPA with 1,090 average megawatts (aMW) of power. Under these agreements, sponsors are obtaining permits and conducting project design work, and BPA is completing this EIS process. In September 1993, BPA published a Notice of Intent to prepare an environmental impact statement (EIS) on these three proposed gas-fired combustion turbine projects and held public scoping meetings in October 1993 at each site. In February 1994, BPA released an Implementation Plan on the proposed scope of the EIS. A draft EIS on the three proposed projects was published in February 1995. The impacts of the Chehalis and Satsop projects located in Washington State will be covered in one EIS document, while the impacts of the Hermiston project located in Oregon are covered in this final EIS document. It is BPA`s intent to continue to base the analysis of impacts on the assumption that all three projects may be constructed at some point in the future.

  16. Resource contingency program - Oregon. Final environmental impact statement, Hermiston power project

    International Nuclear Information System (INIS)

    1995-09-01

    The Bonneville Power Administration (BPA) has statutory responsibilities to supply electrical power to its utility, industrial, and other customers in the Pacific Northwest. In 1990, to cover the outer range of potential load growth with new resources, BPA embarked upon the Resource Contingency Program (RCP). Instead of buying or building generating plants now, BPA has purchased options to acquire power later, if and when it is needed. The decision to acquire any of these option energy projects to fulfill statutory supply obligations will be influenced by Federal system load growth, the outcome of BPA's Business Plan, required operational changes in Columbia-Snake River Hydroelectric facilities, and the loss of major generating resources. In September 1993, three option development agreements were signed with three proposed natural gas-fired, combined cycle combustion turbine CT projects near Chehalis and Satsop, Washington, and near Hermiston, Oregon. Together these three projects could supply BPA with 1,090 average megawatts (aMW) of power. Under these agreements, sponsors are obtaining permits and conducting project design work, and BPA is completing this EIS process. In September 1993, BPA published a Notice of Intent to prepare an environmental impact statement (EIS) on these three proposed gas-fired combustion turbine projects and held public scoping meetings in October 1993 at each site. In February 1994, BPA released an Implementation Plan on the proposed scope of the EIS. A draft EIS on the three proposed projects was published in February 1995. The impacts of the Chehalis and Satsop projects located in Washington State will be covered in one EIS document, while the impacts of the Hermiston project located in Oregon are covered in this final EIS document. It is BPA's intent to continue to base the analysis of impacts on the assumption that all three projects may be constructed at some point in the future

  17. DE-NE0000735 - FINAL REPORT ON THORIUM FUEL CYCLE NEUP PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    Krahn, Steven [Vanderbilt Univ., Nashville, TN (United States); Ault, Timothy [Vanderbilt Univ., Nashville, TN (United States); Worrall, Andrew [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2017-09-30

    The report is broken into six chapters, including this executive summary chapter. Following an introduction, this report discusses each of the project’s three major components (Fuel Cycle Data Package (FCDP) Development, Thorium Fuel Cycle Literature Analysis and Database Development, and the Thorium Fuel Cycle Technical Track and Proceedings). A final chapter is devoted to summarization. Various outcomes, publications, etc. originating from this project can be found in the Appendices at the end of the document.

  18. ISS-NIH Collaborative Programme: final report of the projects

    International Nuclear Information System (INIS)

    2009-01-01

    In July 2003, the National Institutes of Health (NIH) of the United States of America and the Istituto Superiore di Sanita (ISS) of Italy signed an agreement aimed at strengthening the ongoing research cooperation between USA and Italy. Over the years, the programme was able to create new partnerships and to foster the establishment of innovative synergies, the exchange of young researcher, and the merging of the best available skills, talents and know-how in different fields of biomedical sciences. This book contains the final report of the projects of the scientific cooperation between the two Countries. The report consists of two parts (in Italian and English) divided into four sections: Cancer, Neuroscience, Cardiovascular diseases, Infectious diseases [it

  19. Peculiarities of transformation processes in East Germany

    Directory of Open Access Journals (Sweden)

    Marion Dathe

    2011-03-01

    Full Text Available The process of socio-economic transformation of East German lands after the German reunification in 1990 is analyzed, the term "transformation" in frames of planned and market economies is defined. The author studies the historical determinants of the transformation process in Germany. German economic and industrial history in context of the driving forces and their social values, as well as the properties of the planning and economic systems that underlie the transformation of East German mentality, are considered. Further analysis is connected with economic, social and political components of the East German transformation process, "the dominance of the West", the collapse of the Council for Mutual Economic Assistance, privatization etc. Finally, the outcome of already traversed path of transformation of East Germany is considered. It is concluded, that the transformation process is not only historically conditioned situations of both the merging parties in the case of Germany, but also the positive or negative perception of its results and the motivation for its further implementation.

  20. Paddys Run Streambank Stabilization Project at the Fernald Preserve, Harrison, OH

    Energy Technology Data Exchange (ETDEWEB)

    Hooten, Gwendolyn [Dept. of Energy (DOE), Legacy Management; Hertel, Bill [Navarro Research and Engineering; Homer, John [Navarro Research and Engineering

    2016-03-01

    The Fernald Preserve is a former uranium-processing plant that underwent extensive remediation pursuant to CERCLA and is now managed by the US DOE Office of Legacy Management. While remediation of buildings and soil contamination was completed in 2006, aquifer remediation is ongoing. Paddys Run is a second-order stream that runs to the south along the western side of the Fernald Preserve. The Paddys Run watershed encompasses nearly 41 km2 (16 mi2), including most of the Fernald site. Field personnel conducting routine site inspections in March 2014 observed that Paddys Run was migrating east via bank erosion into the “Pit 3 Swale,” an area of known surface-water contamination. The soil there was certified pursuant to site regulatory agreements and meets all final remediation levels. However, weekly surface-water monitoring is conducted from two puddles within the swale area, when water that exceeds the final remediation levels is present. Paddys Run had migrated east approximately 4 m (13 ft) in 2 years and was approximately 29 m (95 ft) from the sample location. This rapid migration threatened existing conditions that allowed for continued monitoring of the swale area and also threatened Paddys Run water quality. Therefore, DOE and regulators determined that the east bank of Paddys Run required stabilization. This was accomplished with a design that included the following components: relocation of approximately 145 m (475 ft) of streambed 9 m (30 ft) west, installation of a rock toe along the east bank, installation of two cross-vane in-stream grade-control structures, stabilization of a portion of the east bank using soil encapsulated lifts, and regrading, seeding, and planting within remaining disturbed areas. In an effort to take advantage of low-flow conditions in Paddys Run, construction was initiated in September 2014. Weather delays and subsurface flow within the Paddys Run streambed resulted in an interim shutdown of the project area in December 2014

  1. Development and Implementation of the Collaboratory on EAST

    International Nuclear Information System (INIS)

    Zhang Mingxin; Luo Jiarong; Li Guiming; Wang Hua; Cheng Ting

    2006-01-01

    The collaboratory for the EAST is available, which possesses the capacity to further advance active research on EAST. In doing so, the distance between local researchers and participators over the world is just a click away. To feature the system with the function of remote control, the functional business logic is all encapsulated in the mandatory controls, which can potentially boost the computing capability of the clients with a B/S framework. At the same time, the EAST collaboratory embraces powerful on-line data exchange and data management functions via state-of-the-art XML Web services. With the goal of accessing and analysing the pivotal experimental data on-line, a data analysis system is implemented in JAVA. Finally as a valuable asset of the EAST collaboratory the function of videoconference will be also covered in this contribution

  2. Decontamination and dismantlement of the building 594 waste ion exchange facility at Argonne National Laboratory-East project final report

    International Nuclear Information System (INIS)

    Wiese, E. C.

    1998-01-01

    The Building 594 D and D Project was directed toward the following goals: Removal of any radioactive and hazardous materials associated with the Waste Ion Exchange Facility; Decontamination of the Waste Ion Exchange Facility to unrestricted use levels; Demolition of Building 594; and Documentation of all project activities affecting quality (i.e., waste packaging, instrument calibration, audit results, and personnel exposure) These goals had been set in order to eliminate the radiological and hazardous safety concerns inherent in the Waste Ion Exchange Facility and to allow, upon completion of the project, unescorted and unmonitored access to the area. The ion exchange system and the resin contained in the system were the primary areas of concern, while the condition of the building which housed the system was of secondary concern. ANL-E health physics technicians characterized the Building 594 Waste Ion Exchange Facility in September 1996. The characterization identified a total of three radionuclides present in the Waste Ion Exchange Facility with a total activity of less than 5 microCi (175 kBq). The radionuclides of concern were Co 60 , Cs 137 , and Am 241 . The highest dose rates observed during the project were associated with the resin in the exchange vessels. DOE Order 5480.2A establishes the maximum whole body exposure for occupational workers at 5 rem (50 mSv)/yr; the administrative limit at ANL-E is 1 rem/yr (10 mSv/yr)

  3. Pilot project Uljabuouda. Final report; Pilotprojekt Uljabuouda. Slutrapport

    Energy Technology Data Exchange (ETDEWEB)

    2011-07-01

    During the period of 2007-2010 Skellefteaa Kraft AB erected a wind farm comprising 10 3 MW wind turbines on the mountain Uljabuouda in the municipality of Arjeplog. The turbines are of the type WWD-3 with a hub height of 80 meters and a rotor diameter of 90 meters. The Uljabuouda wind farm is one of the first erected above the treeline in the Swedish mountains. The wind turbines are adapted to cold climate equipped with an ice prevention system for the blades. The process of obtaining the necessary permits for the erection of the wind farm was lengthy and lasted during the period of 2000 to 2008. Also the procurement process took longer than expected. During the period of 2006-2008 when the procurement was performed it was difficult to find a supplier who could offer wind turbines equipped with a deicing system. In December 2006 the Uljabuouda project was granted a subsidy from the Swedish Energy Agency, the maximum of 35 million Swedish crowns. The final investment costs of the project will be higher than previously estimated. The main reason for this was the prevailing market conditions during the procurement period. The Uljabuouda wind farm is in full operation since the winter of 2010/2011 and so far our experiences are that the ice prevention system is working well even at harsh icing conditions

  4. WP1 – Final project report

    NARCIS (Netherlands)

    Drachsler, Hendrik; Scheffel, Maren; Orrego, Carola; Stieger, Lina; Hartkopf, Kathleen; Henn, Patrick; Hynes, Helen; Przibilla, Monika; Geiger, Uschi; Schroeder, Hanna; Sopka, Sasa

    2015-01-01

    This report contains the complete project reporting of the PATIENT project from October 2012 until end of March 2015. It provides a summary of all project activities and achievements that are based on the previous WP deliverables such as the project progress reports from WP1 (D1.01) and the quality

  5. The Final Demise Of East Tennessee Technology Park Building K-33

    International Nuclear Information System (INIS)

    King, David A.

    2011-01-01

    Building K-33 was constructed in 1954 as the final section of the five-stage uranium enrichment cascade at the Oak Ridge Gaseous Diffusion Plant (ORGDP). The two original building (K-25 and K-27) were used to produce weapons grade highly enriched uranium (HEU). Building K-29, K-31, and K-33 were added to produce low enriched uranium (LEU) for nuclear power plant fuel. During ORGDP operations K-33 produced a peak enrichment of 2.5%. Thousands of tons of reactor tails fed into gaseous diffusion plants in the 1950s and early 1960s introducing some fission products and transuranics. Building K-33 was a two-story, 25-meters (82-feet) tall structure with approximately 30 hectare (64 acres) of floor space. The Operations (first) Floor contained offices, change houses, feed vaporization rooms, and auxiliary equipment to support enrichment operations. The Cell (second) Floor contained the enrichment process equipment and was divided into eight process units (designated K-902-1 through K-902-8). Each unit contained ten cells, and each cell contained eight process stages (diffusers) for a total of 640 enrichment stages. 1985: LEU buildings were taken off-line after the anticipated demand for uranium enrichment failed to materialize. 1987: LEU buildings were placed in permanent shutdown. Process equipment were maintained in a shutdown state. 1997: DOE signed an Action Memorandum for equipment removal and decontamination of Buildings K-29, K-31, K-33; BNFL awarded contract to reindustrialize the buildings under the Three Buildings D and D and Recycle Project. 2002: Equipment removal complete and effort shifts to vacuuming, chemical cleaning, scabbling, etc. 2005: Decontamination efforts in K-33 cease. Building left with significant 99 Tc contamination on metal structures and PCB contamination in concrete. Uranium, transuranics, and fission products also present on building shell. 2009: DOE targets Building K-33 for demolition. 2010: ORAU contracted to characterize Building K-33

  6. 77 FR 5566 - Notice of Availability of the Final EIS for the HB In-Situ Solution Mine Project, Eddy County...

    Science.gov (United States)

    2012-02-03

    ...] Notice of Availability of the Final EIS for the HB In-Situ Solution Mine Project, Eddy County, New Mexico... Statement (Final EIS) for the HB In-Situ Solution Mine Project, and by this notice is announcing its... the Federal Register. ADDRESSES: Copies of the HB In-Situ Solution Mining EIS are available for public...

  7. 77 FR 66480 - Final Environmental Impact Statement, Narrows Project, Sanpete County, Utah

    Science.gov (United States)

    2012-11-05

    ..., Utah 84501 Harold B. Lee Library, Brigham Young University, 701 East University Parkway, Provo, Utah 84602-6800 Manti Public Library, 50 South Main Street, Manti, Utah 84642 Marriott Library, University of Utah, 295 South 1500 East, Salt Lake City, Utah 84112 Merrill-Cazier Library, Utah State University...

  8. Phase V storage (Project W-112) Central Waste Complex operational readiness review, final report

    International Nuclear Information System (INIS)

    Wight, R.H.

    1997-01-01

    This document is the final report for the RFSH conducted, Contractor Operational Readiness Review (ORR) for the Central Waste Complex (CWC) Project W-112 and Interim Safety Basis implementation. As appendices, all findings, observations, lines of inquiry and the implementation plan are included

  9. Phase 5 storage (Project W-112) Central Waste Complex operational readiness review, final report

    Energy Technology Data Exchange (ETDEWEB)

    Wight, R.H.

    1997-05-30

    This document is the final report for the RFSH conducted, Contractor Operational Readiness Review (ORR) for the Central Waste Complex (CWC) Project W-112 and Interim Safety Basis implementation. As appendices, all findings, observations, lines of inquiry and the implementation plan are included.

  10. Automated metadata--final project report

    Energy Technology Data Exchange (ETDEWEB)

    Schissel, David [General Atomics, San Diego, CA (United States)

    2016-04-01

    This report summarizes the work of the Automated Metadata, Provenance Cataloging, and Navigable Interfaces: Ensuring the Usefulness of Extreme-Scale Data Project (MPO Project) funded by the United States Department of Energy (DOE), Offices of Advanced Scientific Computing Research and Fusion Energy Sciences. Initially funded for three years starting in 2012, it was extended for 6 months with additional funding. The project was a collaboration between scientists at General Atomics, Lawrence Berkley National Laboratory (LBNL), and Massachusetts Institute of Technology (MIT). The group leveraged existing computer science technology where possible, and extended or created new capabilities where required. The MPO project was able to successfully create a suite of software tools that can be used by a scientific community to automatically document their scientific workflows. These tools were integrated into workflows for fusion energy and climate research illustrating the general applicability of the project’s toolkit. Feedback was very positive on the project’s toolkit and the value of such automatic workflow documentation to the scientific endeavor.

  11. Final report from VFL technologies for the pilot-scale thermal treatment of Lower East Fork Poplar Creek floodplain soils

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-09-01

    The Lower East Fork Poplar Creek (LEFPC) extends fourteen (14) miles through Oak Ridge, TN. The Creek sediments and surrounding floodplain soils are contaminated with mercury compounds. This project involved a comprehensive pilot demonstration on thermal desorption of these soils to validate the feasibility of the remedial technology which had been identified in previous studies. Thermal desorption is a technology that utilizes heating or drying of soils to induce volatilization of contaminants. These contaminants are then vaporized and either incinerated or condensed in the second stage of desorption. Mercury (Hg), which was the principal contaminate of concern, was collected by condensers in a vapor collection system. This type of system insured that the toxic mercury vapors did not escape to the atmosphere.

  12. Final report from VFL technologies for the pilot-scale thermal treatment of Lower East Fork Poplar Creek floodplain soils

    International Nuclear Information System (INIS)

    1994-09-01

    The Lower East Fork Poplar Creek (LEFPC) extends fourteen (14) miles through Oak Ridge, TN. The Creek sediments and surrounding floodplain soils are contaminated with mercury compounds. This project involved a comprehensive pilot demonstration on thermal desorption of these soils to validate the feasibility of the remedial technology which had been identified in previous studies. Thermal desorption is a technology that utilizes heating or drying of soils to induce volatilization of contaminants. These contaminants are then vaporized and either incinerated or condensed in the second stage of desorption. Mercury (Hg), which was the principal contaminate of concern, was collected by condensers in a vapor collection system. This type of system insured that the toxic mercury vapors did not escape to the atmosphere

  13. Lithostratigraphic, borehole-geophysical, hydrogeologic, and hydrochemical data from the East Bay Plain, Alameda County, California

    Science.gov (United States)

    Sneed, Michelle; Orlando, Patricia v.P.; Borchers, James W.; Everett, Rhett; Solt, Michael; McGann, Mary; Lowers, Heather; Mahan, Shannon

    2015-01-01

    The U.S. Geological Survey, in cooperation with the East Bay Municipal Utility District, carried out an investigation of aquifer-system deformation associated with groundwater-level changes at the Bayside Groundwater Project near the modern San Francisco Bay shore in San Lorenzo, California. As a part of the Bayside Groundwater Project, East Bay Municipal Utility District proposed an aquifer storage and recovery program for 1 million gallons of water per day. The potential for aquifer-system compaction and expansion, and related subsidence, uplift, or both, resulting from aquifer storage and recovery activities were investigated and monitored in the Bayside Groundwater Project. In addition, baseline analysis of groundwater and substrata properties were performed to assess the potential effect of such activities. Chemical and physical data, obtained from the subsurface at four sites on the east side of San Francisco Bay in the San Lorenzo and San Leandro areas of the East Bay Plain, Alameda County, California, were collected during the study. The results of the study were provided to the East Bay Municipal Utility District and other agencies to evaluate the chemical and mechanical responses of aquifers underlying the East Bay Plain to the future injection and recovery of imported water from the Sierra Nevada of California.

  14. 78 FR 24677 - Safety Zone; XA The Experimental Agency Fireworks, Pier 34, East River, NY

    Science.gov (United States)

    2013-04-26

    ... Final Rule This rule establishes a temporary safety zone on the navigable waters of the East River, in... Fireworks, Pier 34, East River, NY. (a) Regulated Area. The following area is a temporary safety zone: all... 1625-AA00 Safety Zone; XA The Experimental Agency Fireworks, Pier 34, East River, NY AGENCY: Coast...

  15. Final Report for the ADMX Phase 2a Project at the University of Washington

    International Nuclear Information System (INIS)

    Rosenberg, Leslie J.

    2015-01-01

    This is a final report of the ADMX (Axion Dark Matter eXperiment) Phase 2a program. This program is a project allowing for a sensitive axion dark-matter search at higher axion masses. The Phase 2a program also prepares the project for lower temperature anticipated in later operations. The Phase 2a program includes sensitive data-taking operations at two cavity modes, TM010 and TM020, allowing for faster data-taking operations and extending the search to higher and plausible dark-matter axion masses.

  16. Strategy for thermo-gravimetric analysis of K East fuel samples

    International Nuclear Information System (INIS)

    Lawrence, L.A.

    1997-01-01

    A strategy was developed for the Thermo-Gravimetric Analysis (TGA) testing of K East fuel samples for oxidation rate determinations. Tests will first establish if there are any differences for dry air oxidation between the K West and K East fuel. These tests will be followed by moist inert gas oxidation rate measurements. The final series of tests will consider pure water vapor i.e., steam

  17. Reactor vessel decommissioning project. Final report

    International Nuclear Information System (INIS)

    Schoonen, D.H.

    1984-09-01

    This report describes a reactor vessel decommissioning project; it documents and explains the project objectives, scope, performance results, and sodium removal process. The project was successfully completed in FY-1983, within budget and without significant problems or adverse impact on the environment. Waste generated by the operation included the reactor vessel, drained sodium, and liquid, solid, and gaseous wastes which were significantly less than project estimates. Personnel radiation exposures were minimized, such that the project total was one-half the predicted exposure level. Except for the sodium removed, the material remaining in the reactor vessel is essentially the same as when the vessel arrived for processing

  18. Parent Attitudes Toward the Virginia Beach Year-Round School Pilot Project. Final Report.

    Science.gov (United States)

    Schlechty, Phillip C.

    Part of the Virginia Beach year-round school program evaluation, this final report contains a detailed analysis of parental attitudes, beliefs, and perceptions. The data leads to the following conclusions: a majority (53.3 percent) of parents are dubious or negative toward the 45-15 pilot project; a slight majority of parents in the pilot schools…

  19. System Description for the K-25/K-27 D and D Project Polyurethane Foam Delivery System, East Tennessee Technology Park, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Boris, G.

    2008-01-01

    The Foam Delivery System used in the decontamination and decommissioning (D and D) project for the K-25/K-27 Buildings at the East Tennessee Technology Park (ETTP) is comprised of a trailer-mounted Gusmer(reg s ign) H20/35 Pro-TEC Proportioning Unit and the associated equipment to convey electrical power, air, and foam component material to the unit. This high-pressure, plural-component polyurethane foam pouring system will be used to fill process gas and non-process equipment/piping (PGE/P) within the K-25/K-27 Buildings with polyurethane foam to immobilize contaminants prior to removal. The system creates foam by mixing isocyanate and polyol resin (Resin) component materials. Currently, the project plans to utilize up to six foaming units simultaneously during peak foaming activities. Also included in this system description are the foam component material storage containers that will be used for storage of the component material drums in a staging area outside of the K-25/K-27 Buildings. The Foam Delivery System and foam component material storage enclosures (i.e., Foaming Component Protective Enclosures) used to store polymeric methylene diphenyl diisocyanate (PMDI) component material are identified as Safety Significant (SS) Structures, Systems and Components (SSC) in the Documented Safety Analysis (DSA) for the project, Documented Safety Analysis for the K-25 and K-27 Facilities at the East Tennessee Technology Park, Oak Ridge, Tennessee, DSA-ET-K-25/K-27-0001

  20. Decontamination and dismantlement of the building 200/205 pneumatic transfer tube at Argonne National Laboratory-East project final report

    International Nuclear Information System (INIS)

    Wiese, E. C.

    1998-01-01

    The Building 200/205 Pneumatic Transfer Tube D and D Project was directed toward the following goals: Remove any radioactive and hazardous materials associated with the transfer tube; Survey the transfer tube to identify any external contamination; Remove the transfer tube and package for disposal; Survey the soil and sand surrounding the transfer tube for any contamination; and Backfill the trench in which the tube sat and restore the area to its original condition. These goals had been set in order to eliminate the radiological and hazardous safety concerns inherent in the buried transfer tube and to allow, upon completion of the project, the removal of this project from the ANL-E action item list. The physical condition of the transfer tube and possible nuclear fuel samples lost in the tube were the primary areas of concern, while the exact location of the transfer tube was of secondary concern. ANL-E health physics technicians collected characterization data from the ends of the Building 200/205 pneumatic transfer tube in January 1998. The characterization surveys identified contamination to a level of 67,000 dpm (1,117 Bq) (β/γ) and 20,000 dpm (333 Bq) α smearable at the opening

  1. East Kentucky Bioenergy Capacity Assessment Project

    Energy Technology Data Exchange (ETDEWEB)

    Phillips, J. Michael [Morehead State Univ., KY (United States); Montross, Michael [Univ. of Kentucky, Lexington, KY (United States); Mark, Tyler [Morehead State Univ., KY (United States)

    2013-03-31

    When you look across the landscape of Kentucky you will find a very diverse topography. In the western portions of the state you will find fertile and gently rolling soils that are prime land for traditional row crop production. As you move east towards the Appalachian Mountains the terrain becomes increasing roughed and less productive soils. One of the primary objectives of Morehead State University is to serve the eastern Kentucky population of Kentucky. Fitting within that mission is identifying new opportunities for people living in this region. With the passing of the Renewable Fuels Standard in 2005 there was a focus put on the production of biomass crops that can be used in the production of ethanol and cellulosic ethanol. The majority of US ethanol production is derived from corn. The eastern portion of Kentucky is not well suited for corn production, but might be a location for other biomass crops to be produced. Additionally, many farmers in the region were looking for alternative crops to tobacco that might be well suited for the region.

  2. Consolidating Science Journalism in Africa and the Middle East ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    This project aims to promote health and sustainable development in Africa and the Middle East by building the capacity of the media to inform public opinion and promote evidence-based policymaking. The project will involve training 60 journalists in science reporting and 15 experienced science journalists as trainers in ...

  3. Resource Roads demonstration project : final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2009-07-15

    British Columbia's vast network of resource roads are considered to be amongst the most dangerous, high-risk workplaces in the province. Resource roads, also known as industrial roads, forest service roads, or petroleum development roads, present several unique safety challenges as workplaces. They are built for the purpose of access, egress and transport of materials, resources, equipment and people. However, the lack the same diligence of enforcement and a consistent design, construction, maintenance and standard for use as public highways or municipal roads. There are also safety challenges related to public use of resource roads. This report presented a project, called ResourceRoads by WorkSafe BC that focused on the organization and implementation of a management structure that would provide a system of coordination and a process of compliance for the users of the defined road systems. The project was based on information gathered in two forest districts of Prince George and the South Peace Forest Districts. A committee consisting of the actual owner of the road and other users was formed. The report presented a history of British Columbia's resource road system, and discussed resource roads as industrial workplaces and worksites, as well as resource road fatality statistics. The demonstration project was outlined in terms of project leadership; scope; strategic objectives; project purpose; performance objectives; project communication; demonstration areas; and project stages. Project fundamentals and project findings were also presented along with recommendations and responses to the Auditor General report and the Forest Safety Ombudsman report. It was concluded that potential uses of new technologies for resource road vehicles should be reviewed. tabs., figs.

  4. Smart Intelligent Aircraft Structures (SARISTU) : Proceedings of the Final Project Conference

    CERN Document Server

    Papadopoulos, Michael

    2016-01-01

    The book includes the research papers presented in the final conference of the EU funded SARISTU (Smart Intelligent Aircraft Structures) project, held at Moscow, Russia between 19-21 of May 2015. The SARISTU project, which was launched in September 2011, developed and tested a variety of individual applications as well as their combinations. With a strong focus on actual physical integration and subsequent material and structural testing, SARISTU has been responsible for important progress on the route to industrialization of structure integrated functionalities such as Conformal Morphing, Structural Health Monitoring and Nanocomposites. The gap- and edge-free deformation of aerodynamic surfaces known as conformal morphing has gained previously unrealized capabilities such as inherent de-icing, erosion protection and lightning strike protection, while at the same time the technological risk has been greatly reduced. Individual structural health monitoring techniques can now be applied at the part-manufacturin...

  5. UCSD Performance in the Edge Plasma Simulation (EPSI) Project. Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Tynan, George Robert [Univ. of California, San Diego, CA (United States). Center for Energy Research

    2017-12-12

    This report contains a final report on the activities of UC San Diego PI G.R. Tynan and his collaborators as part of the EPSI Project, that was led by Dr. C.S. Chang, from PPPL. As a part of our work, we carried out several experiments on the ALCATOR C-­MOD tokamak device, aimed at unraveling the “trigger” or cause of the spontaneous transition from low-­mode confinement (L-­mode) to high confinement (H-­mode) that is universally observed in tokamak devices, and is planned for use in ITER.

  6. Tectonics of East Siberian Sea Basin and its influence on petroleum systems

    Science.gov (United States)

    Karpov, Yury; Antonina, Stoupakova; Anna, Suslova; Mariia, Agasheva

    2016-04-01

    The East Siberian Sea basin (ESSB) is the largest part of the Siberian Arctic shelf, extending for over 1000 km from New Siberian Islands archipelago to Wrangel Island. Nowadays East Siberian Sea margin is considered as a region with probable high petroleum potential. This part of Russian Arctic shelf is the least studied. The major problems in geological investigation of East Siberian Sea shelf are absence of deep wells in area and low seismic exploration maturity. Only general conclusions on its geology and hydrocarbon systems can be drawn based on limited seismic, gravity and magnetic data, supported by projection of onshore geological data to offshore. So, that's why now only complex geological and seismic stratigraphy interpretations are provided. Today we have several concepts and can summarize the tectonic history of the basin. The basin is filled with siliclastic sediments. In the deepest depocentres sediments thickness exceed 8 km in average. Seismic data was interpreted using methods of seismic stratigraphy. Stratigraphic interpretation was possible to achieve because seismic reflections follow chronostratigraphic correlations. Finally, main seismic horizons were indicated. Each indicated horizon follows regional stratigraphic unconformity. In case of absence of deep wells in ESSB, we can only prove possible source rocks by projection of data about New Siberian Islands archipelago source rocks on offshore. The petroleum potential of these rocks was investigated by several authors [1, 2, 3]. Perspective structures, investigated in ESSB were founded out by comparing seismogeological cross-sections with explored analogs in other Russian and foreign onshore and offshore basins. The majority of structures could be connected with stratigraphic and fault traps. New data on possible petroleum plays was analyzed, large massif of data on geology and tectonic history of the region was collected, so now we can use method of basin modelling to evaluate hydrocarbon

  7. Telephone Flat Geothermal Development Project Environmental Impact Statement Environmental Impact Report. Final: Comments and Responses to Comments

    Energy Technology Data Exchange (ETDEWEB)

    None

    1999-02-01

    This document is the Comments and Responses to Comments volume of the Final Environmental Impact Statement and Environmental Impact Report prepared for the proposed Telephone Flat Geothermal Development Project (Final EIS/EIR). This volume of the Final EIS/EIR provides copies of the written comments received on the Draft EIS/EIR and the leady agency responses to those comments in conformance with the requirements of the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA).

  8. Harmony in Career Learning and Scholastic System (Project HI-CLASS). Final Evaluation Report 1992-93. OREA Report.

    Science.gov (United States)

    Duque, Diana L.

    Harmony in Career Learning and Scholastic System (Project HI-CLASS) was a Transitional Bilingual Education Title VII-funded program in its fifth and final year in 1992-93. The project offered instructional and support services to 641 students of limited English proficiency (LEP) at three sites, all of which had many immigrant students, in…

  9. Kansas Advanced Semiconductor Project: Final Report

    International Nuclear Information System (INIS)

    Baringer, P.; Bean, A.; Bolton, T.; Horton-Smith, G.; Maravin, Y.; Ratra, B.; Stanton, N.; von Toerne, E.; Wilson, G.

    2007-01-01

    KASP (Kansas Advanced Semiconductor Project) completed the new Layer 0 upgrade for D0, assumed key electronics projects for the US CMS project, finished important new physics measurements with the D0 experiment at Fermilab, made substantial contributions to detector studies for the proposed e+e- international linear collider (ILC), and advanced key initiatives in non-accelerator-based neutrino physics.

  10. DIMEC - Final Report

    DEFF Research Database (Denmark)

    Conrad, Finn

    1997-01-01

    Final report of the research project DIMEC - Danish InfoMechatronic Control supported by the Danish Technical Research Council, STVF.......Final report of the research project DIMEC - Danish InfoMechatronic Control supported by the Danish Technical Research Council, STVF....

  11. 77 FR 23740 - Sears Point Wetland and Watershed Restoration Project, Sonoma County, CA; Final Environmental...

    Science.gov (United States)

    2012-04-20

    ...-FF08RSFC00] Sears Point Wetland and Watershed Restoration Project, Sonoma County, CA; Final Environmental... environmental impact report and environmental impact statement (EIR/EIS) for the Sears Point Wetland and..., while providing public access and recreational and educational opportunities compatible with ecological...

  12. Virginia Solar Pathways Project Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Bond, Katharine; Cosby, Sarah

    2018-03-28

    This Report provides a technical review of the final results of a funding award to Virginia Electric and Power Company (Dominion Energy Virginia (DEV) or the Company) for a project under the U.S. Department of Energy’s Solar Energy Technologies Office. The three-year project was formally known as the Virginia Solar Pathways Project (VSPP or the Project). The purpose of the VSPP was to develop a collaborative utility-administered solar strategy (Solar Strategy) for DEV’s service territory in the Commonwealth that could serve as a replicable model for other states with similar policy environments. The U.S. Department of Energy (DOE) funding award enabled DEV to take a focused approach to developing the Solar Strategy for its Virginia service territory. The structure and funding from the DOE award also facilitated valuable input from a formal stakeholder team convened to serve as advisors (Advisory Team) to the VSPP and contribute their perspectives and expertise to both the analysis and strategy development aspects of the Project. The development of the Solar Strategy involved three main goals: • Establish a policy and program framework that would integrate existing solar programs with new options appropriate for the Commonwealth’s policy environment and broader economic development objectives; • Promote wider deployment of solar within a low retail electric rate environment; and • Serve as a sustainable, utility-administered solar model that could be replicated in other states with similar policy environments, including, but not limited to, the entire Southeast region. In support of the VSPP goals, the Project Team commissioned four studies to support the Solar Strategy development. Two studies, completed by Navigant Consulting, focused on the integration of solar into the electric grid. The first solar integration study focused on integration of solar into the distribution grid where the utility system directly connects to and serves end-use customers

  13. Project Execution Plan,Rev. 3; FINAL

    International Nuclear Information System (INIS)

    IT Corporation, Las Vegas

    2002-01-01

    This plan addresses project activities encompassed by the U.S. Department of Energy's (DOE's), National Nuclear Security Administration Nevada Operations Office, Environmental Restoration Division and conforms to the requirements contained in the Life-Cycle Asset Management, DOE Order 430.1A; The Joint Program Office Policy on Project Management in Support of DOE Order 430.1; Program and Project Management for the Acquisition of Capital Assets, DOE Order 413.3; the Project Execution and Engineering Management Planning Guide, GPG-FM-010; and other applicable Good Practice Guides; and the FY 2001 Integrated Planning, Accountability, and Budgeting System Policy Guidance. The plan also reflects the milestone philosophies of the Federal Facility Agreement and Consent Order, as agreed to by the State of Nevada, the DOE, and the U.S. Department of Defense; and traditional project management philosophies such as the development of life-cycle costs, schedules, and work scope; identification o f roles and responsibilities; and baseline management and controls

  14. Middle East Regional Irrigation Management Information Systems project-Some science products

    Science.gov (United States)

    Similarities in the aridity of environments and water scarcity for irrigation allow common approaches to irrigation management problems and research methods in the Southern Great Plains of the United States and the Middle East. Measurement methods involving weighing lysimeters and eddy covariance sy...

  15. Smart Gun Technology project. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Weiss, D.R.

    1996-05-01

    The goal of the Smart Gun Technology project is to eliminate the capability of an unauthorized user form firing a law officer`s firearm by implementing user-recognizing-and-authorizing (or {open_quotes}smart{close_quotes}) surety technologies. This project was funded by the National Institute of Justice. This report lists the findings and results of the project`s three primary objectives. First, to find and document the requirements for a smart firearm technology that law enforcement officers will value. Second, to investigate, evaluate, and prioritize technologies that meet the requirements for a law enforcement officer`s smart firearm. Third, to demonstrate and document the most promising technology`s usefulness in models of a smart firearm.

  16. Final Report Sustained Spheromak Physics Project FY 1997 - FY 1999

    International Nuclear Information System (INIS)

    Hooper, E.B.; Hill, D.N.

    2000-01-01

    This is the final report on the LDRD SI-funded Sustained Spheromak Physics Project for the years FY1997-FY1999, during which the SSPX spheromak was designed, built, and commissioned for operation at LLNL. The specific LDRD project covered in this report concerns the development, installation, and operation of specialized hardware and diagnostics for use on the SSPX facility in order to study energy confinement in a sustained spheromak plasma configuration. The USDOE Office of Fusion Energy Science funded the construction and routine operation of the SSPX facility. The main distinctive feature of the spheromak is that currents in the plasma itself produce the confining toroidal magnetic field, rather than external coils, which necessarily thread the vacuum vessel. There main objective of the Sustained Spheromak Physics Project was to test whether sufficient energy confinement could be maintained in a spheromak plasma sustained by DC helicity injection. Achieving central electron temperatures of several hundred eV would indicate this. In addition, we set out to determine how the energy confinement scales with T c and to relate the confinement time to the level of internal magnetic turbulence. Energy confinement and its scaling are the central technical issues for the spheromak as a fusion reactor concept. Pending the outcome of energy confinement studies now under way, the spheromak could be the basis for an attractive fusion reactor because of its compact size, simply-connected magnetic geometry, and potential for steady-state current drive

  17. STEER Coastal Use Mapping Project

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Coastal Use Mapping Project is designed to collect critical information on human activities in and near the St. Thomas East End Reserves (STEER). The project...

  18. Promotion of Nuclear Non-proliferation in East Asia

    International Nuclear Information System (INIS)

    Hwang, Yong Soo

    2009-07-01

    KAERI has jointly worked with Sandia National Laboratories for Nuclear Energy Non-proliferation in East Asia for the last five years. This project aims at support activities in this joint project between two states. The annual meetings were held during the project period, the 4th one in 2008 and the 5th one in 2009. In addition code comparison between KAERI and SNL's codes for assessing the back-end fuel cycle options was carried out. This project strongly enhances the close tie for the non-proliferation, transparency and safeguards among Korea Japan China Taiwan the United States Russia Malaysia Singapore Indonesia Thailand Vietnam and others for the project period

  19. Spent fuel stability under repository conditions - final report of the european project

    International Nuclear Information System (INIS)

    Poinssot, Ch.; Ferry, C.; Kelm, M.; Cavedon, J.M.; Corbel, C.; Jegou, Ch.; Lovera, P.; Miserque, F.; Poulesquen, A.; Grambow, B.; Andriambololona, Z.; Martinez-Esparza, A.; Kelm, M.; Loida, A.; Rondinella, V.; Wegen, D.; Spahiu, K.; Johnson, L.; Cachoir, Ch.; Lemmens, K.; Quinones, J.; Bruno, J.; Christensen, H.; Grambow, B.; Pablo, J. de

    2005-01-01

    This report is the final report of the European Project 'Spent Fuel Stability under Repository Conditions' (FIKW-CT-2001-00192 SFS) funded by the European Commission from Nov.2000 to Oct.2004. Gathering the work performed by 13 partners from 6 countries, it aims to specifically focus on the spent nuclear fuel long term alteration in deep repository and the subsequent radionuclides release rate as a function of time. This report synthesised the wide experimental work performed within this project and enlightens the major outcomes, which can be summarised as follow: - A new model for defining the Instant Release Fraction was developed in order to consider the potential fuel evolution before the water penetrates the canister. Quantitative assessment has been produced and shows a significant contribution to the long term dose; - Based on new experimental data, kinetic radiolytic scheme have been upgraded and are used to determine the amount of oxidants produced at the fuel/water interface; - The existence of a dose threshold below which the water radiolysis does not influence the fuel alteration has been demonstrated and occurs between 3.5 and 33 MBq.g UO21. Above the threshold, the fuel alteration rates is directly related to the dose rate. - Hydrogen was experimentally demonstrated to be an efficient oxidants scavenger preventing therefore the fuel oxidation. Molecular mechanism still need to be understood. - Finally, a new Matrix Alteration Model integrating most of the SFS results (apart of the hydrogen effect) has been developed and used to assess the fuel long tern stability in representative conditions of deep repository in salt, clay-rock and granite. The breadth of the results and the significance of the conclusions testify of the success of the collaboration within the project. (authors)

  20. 77 FR 40144 - Adoption of the Environmental Impact Statement (EIS) and Participation in the Section 106...

    Science.gov (United States)

    2012-07-06

    ...) obligations related to MTA's request for financing for the East Side Access project through the FRA Railroad... Statement (EIS) and Participation in the Section 106 Programmatic Agreement for the East Side Access Project... adoption and recirculation of the Final Environmental Impact Statement for the East Side Access Project and...

  1. Umatilla Satellite and Release Sites Project : Final Siting Report.

    Energy Technology Data Exchange (ETDEWEB)

    Montgomery, James M.

    1992-04-01

    This report presents the results of site analysis for the Umatilla Satellite and Release Sites Project. The purpose of this project is to provide engineering services for the siting and conceptual design of satellite and release facilities for the Umatilla Basin hatchery program. The Umatilla Basin hatchery program consists of artificial production facilities for salmon and steelhead to enhance production in the Umatilla River as defined in the Umatilla master plan approved in 1989 by the Northwest Power Planning Council. Facilities identified in the master plan include adult salmon broodstock holding and spawning facilities, facilities for recovery, acclimation, and/or extended rearing of salmon juveniles, and development of river sites for release of hatchery salmon and steelhead. The historic and current distribution of fall chinook, summer chinook, and coho salmon and steelhead trout was summarized for the Umatilla River basin. Current and future production and release objectives were reviewed. Twenty seven sites were evaluated for the potential and development of facilities. Engineering and environmental attributes of the sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed.

  2. Final Year Project Report

    Energy Technology Data Exchange (ETDEWEB)

    Hubsch, Tristan [Howard University

    2013-06-20

    In the last years of this eighteen-year grant project, the research efforts have focused mostly on the study of off-shell representations of supersymmetry, both on the worldline and on the world- sheet, i.e., both in supersymmetric quantum mechanics and in supersymmetric field theory in 1+1-dimensional spacetime.

  3. Technical approach to finalizing sensible soil cleanup levels at the Fernald Environmental Management Project

    International Nuclear Information System (INIS)

    Carr, D.; Hertel, B.; Jewett, M.; Janke, R.; Conner, B.

    1996-01-01

    The remedial strategy for addressing contaminated environmental media was recently finalized for the US Department of Energy's (DOE) Fernald Environmental Management Project (FEMP) following almost 10 years of detailed technical analysis. The FEMP represents one of the first major nuclear facilities to successfully complete the Remedial Investigation/Feasibility Study (RI/FS) phase of the environmental restoration process. A critical element of this success was the establishment of sensible cleanup levels for contaminated soil and groundwater both on and off the FEMP property. These cleanup levels were derived based upon a strict application of Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) regulations and guidance, coupled with positive input from the regulatory agencies and the local community regarding projected future land uses for the site. The approach for establishing the cleanup levels was based upon a Feasibility Study (FS) strategy that examined a bounding range of viable future land uses for the site. Within each land use, the cost and technical implications of a range of health-protective cleanup levels for the environmental media were analyzed. Technical considerations in driving these cleanup levels included: direct exposure routes to viable human receptors; cross- media impacts to air, surface water, and groundwater; technical practicality of attaining the levels; volume of affected media; impact to sensitive environmental receptors or ecosystems; and cost. This paper will discuss the technical approach used to support the finalization of the cleanup levels for the site. The final cleanup levels provide the last remaining significant piece to the puzzle of establishing a final site-wide remedial strategy for the FEMP, and positions the facility for the expedient completion of site-wide remedial activities

  4. All projects related to | Page 580 | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    This project seeks to foster an inclusive knowledge society by building capacity to apply information and communication technology (ICT) to human, social and economic development in the Middle East, ... Region: Middle East, Central Asia, Far East Asia, South Asia, Jordan, Lebanon, Malaysia, Syria, Yemen, Palestine.

  5. People and forests in East Kalimantan

    Science.gov (United States)

    Kuswata Kartawinata; Timothy C. Jessup; A. P. Vayda; S. Riswan; Cynthia Mackie; Nancy E. Peluso

    1992-01-01

    Two major Indonesian-MAB (Man and the Biosphere) projects were carried out in the province of East Kalimantan, Indonesia, in the 1980s. Investigators found that farmers vary in their reason for practicing shifting cultivation of logging and agriculture, in their intensity of farming, and in the amount of damage they caused forests in their practices. Shifting...

  6. ACCESS Project: Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Weller, Heiko [Robert Bosch, LLC, Farmington Hills, MI (United States)

    2015-04-01

    The ACCESS project addressed the development, testing, and demonstration of the proposed advanced technologies and the associated emission and fuel economy improvement at an engine dynamometer and on a full-scale vehicle. Improve fuel economy by 25% with minimum performance penalties Achieve SULEV level emissions with gasoline Demonstrate multi-mode combustion engine management system

  7. Final project report for NEET pulsed ion beam project

    Energy Technology Data Exchange (ETDEWEB)

    Kucheyev, S. O. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2018-01-11

    The major goal of this project was to develop and demonstrate a novel experimental approach to access the dynamic regime of radiation damage formation in nuclear materials. In particular, the project exploited a pulsed-ion-beam method in order to gain insight into defect interaction dynamics by measuring effective defect interaction time constants and defect diffusion lengths. This project had the following four major objectives: (i) the demonstration of the pulsed ion beam method for a prototypical nuclear ceramic material, SiC; (ii) the evaluation of the robustness of the pulsed beam method from studies of defect generation rate effects; (iii) the measurement of the temperature dependence of defect dynamics and thermally activated defect-interaction processes by pulsed ion beam techniques; and (iv) the demonstration of alternative characterization techniques to study defect dynamics. As we describe below, all these objectives have been met.

  8. Long term Gas Supply Security in an Enlarged Europe. Final Report ENGAGED Project

    International Nuclear Information System (INIS)

    Van Oostvoorn, F.; Likachev, V.; Morgan, T.

    2004-12-01

    The title project concerned a study on the long-term gas supply security in Europe with a focus on the developments, risks and policies in the candidate countries in Eastern Europe. For that reason the report not only includes a European and EU-30 wide scenario analysis but also chapters on specific topics. One study (a chapter in this report) concerns the gas market and regulation developments in a number of relevant candidate countries. Another chapter presents a Russian vision on gas demand, production and supplies from Russia and also includes a paragraph on the supplies from other neighbours and the transit issues in the Ukraine. Finally, the report contains a chapter discussing the required network infrastructure for bringing the gas from external gas suppliers to the EU-30 markets. Hereby it analysis and tests the network flexibility to cope with some unlikely and unexpected supply interruptions in main pipelines to EU markets. The background information of the studies underlying the chapters can be partly found in the annexes and in the individual task reports. During the project the results of the study were discussed at several seminars in candidate countries and particularly on the final seminar in Prague, in June 2003, with different and important stakeholders and market actors

  9. Independent management and financial review, Yucca Mountain Project, Nevada. Final report, Appendix

    International Nuclear Information System (INIS)

    1995-01-01

    The Nuclear Waste Policy Act of 1982 (Public Law 97-425), as amended by Public Law 100-203, December 22, 1987, established the Office of Civilian Radioactive Waste Management (OCRWM) within the Department of Energy (DOE), and directed the Office to investigate a site at Yucca Mountain, Nevada, to determine if this site is suitable for the construction of a repository for the disposal of high level nuclear waste. Work on site characterization has been under way for several years. Thus far, about $1.47 billion have been spent on Yucca Mountain programs. This work has been funded by Congressional appropriations from a Nuclear Waste Fund to which contributions have been made by electric utility ratepayers through electric utilities generating power from nuclear power stations. The Secretary of Energy and the Governor of the State of Nevada have appointed one person each to a panel to oversee an objective, independent financial and management evaluation of the Yucca Mountain Project. The Requirements for the work will include an analysis of (1) the Yucca Mountain financial and, contract management techniques and controls; (2) Project schedules and credibility of the proposed milestones; (3) Project organizational effectiveness and internal planning processes, and (4) adequacy of funding levels and funding priorities, including the cost of infrastructure and scientific studies. The recipient will provide monthly progress report and the following reports/documents will be presented as deliverables under the contract: (1) Financial and Contract Management Preliminary Report; (2) Project Scheduling Preliminary Report; (3)Project Organizational Effectiveness Preliminary Report; (4) Project Funding Levels and Funding Priorities Preliminary Report; and (5) Final Report

  10. Independent management and financial review, Yucca Mountain Project, Nevada. Final report, Appendix

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-15

    The Nuclear Waste Policy Act of 1982 (Public Law 97-425), as amended by Public Law 100-203, December 22, 1987, established the Office of Civilian Radioactive Waste Management (OCRWM) within the Department of Energy (DOE), and directed the Office to investigate a site at Yucca Mountain, Nevada, to determine if this site is suitable for the construction of a repository for the disposal of high level nuclear waste. Work on site characterization has been under way for several years. Thus far, about $1.47 billion have been spent on Yucca Mountain programs. This work has been funded by Congressional appropriations from a Nuclear Waste Fund to which contributions have been made by electric utility ratepayers through electric utilities generating power from nuclear power stations. The Secretary of Energy and the Governor of the State of Nevada have appointed one person each to a panel to oversee an objective, independent financial and management evaluation of the Yucca Mountain Project. The Requirements for the work will include an analysis of (1) the Yucca Mountain financial and, contract management techniques and controls; (2) Project schedules and credibility of the proposed milestones; (3) Project organizational effectiveness and internal planning processes, and (4) adequacy of funding levels and funding priorities, including the cost of infrastructure and scientific studies. The recipient will provide monthly progress report and the following reports/documents will be presented as deliverables under the contract: (1) Financial and Contract Management Preliminary Report; (2) Project Scheduling Preliminary Report; (3)Project Organizational Effectiveness Preliminary Report; (4) Project Funding Levels and Funding Priorities Preliminary Report; and (5) Final Report.

  11. China's modern day Great Wall : the 40 inch West to East Gas Pipeline Project

    International Nuclear Information System (INIS)

    Gray, L.A.B.

    2004-01-01

    In order to fuel China's economic growth, PetroChina began construction of the West to East Natural Gas Pipeline Project (WEPP) in 2001 to transport large quantities of natural gas reserves from the Tarim Basin in the Xinjiang Autonomous Region in far western China to markets in eastern China. The WEPP is the first large diameter, cross-country pipeline project ever constructed in China, and was the first to use automatic welding and automatic ultrasonic inspection on pipelines in China. This paper addressed the management, engineering, procurement and construction challenges of the WEPP. Upon completion of the 3,800 km, 1.016 mm mainline pipeline, construction will begin on other major facilities, such 294 km of lateral line, dual fiber optic conduits with the mainline, 1,100 km of access roads, 23 metering stations, 18 pigging stations, 10 compressor stations, 16 mountain tunnels, 16 aerial crossings, 1 crossing of the Yangtze River, 3 crossings of the Yellow River, a gas control center, and SCADA system. Houston-based Universal Ensco Inc. was awarded a contract to perform a feasibility study as well as a construction supervision contract by PetroChina for the WEPP. Universal also designed a gas turbine drive compressor station at Lunnan and an electric drive compressor station at Zhengzhou. This paper demonstrated that business in China for foreign companies in the pipeline industry is evolving and several changes can be expected as the state planned economy is reformed to a free market economy. 4 refs., 5 tabs., 17 figs.

  12. Is the east-west power bridge economic?

    International Nuclear Information System (INIS)

    Anon.

    1996-01-01

    At the latest conference of the East-West Energy Bridge project in Warsaw on October 24-25, 1995, the majority opinion concluded that the vast trans-European hvdc network proposed for operation in 2010 could be economically financed and operated in spite of reservations by some German utilities. Anatoliy Dyakov, president of the Russian UPS (Unified Power System), recently said that Russia would shortly start building the line from Smolensk to Kaliningrad as the first stage of this project. (author)

  13. Analysis on Price Elasticity of Energy Demand in East Asia: Empirical Evidence and Policy Implications for ASEAN and East Asia

    OpenAIRE

    Han PHOUMIN; Shigeru KIMURA

    2014-01-01

    This study uses time series data of selected ASEAN and East Asia countries to investigate the patterns of price and income elasticity of energy demand. Applying a dynamic log-linear energy demand model, both short-run and long-run price and income elasticities were estimated by country. The study uses three types of dependent variable “energy demand” such as total primary energy consumption (TPES), total final energy consumption (TFEC) and total final oil consumption (TFOC) to regress on its ...

  14. Medical Proton Accelerator Project

    International Nuclear Information System (INIS)

    Comsan, M.N.H.

    2008-01-01

    A project for a medical proton accelerator for cancer treatment is outlined. The project is motivated by the need for a precise modality for cancer curing especially in children. Proton therapy is known by its superior radiation and biological effectiveness as compared to photon or electron therapy. With 26 proton and 3 heavy-ion therapy complexes operating worldwide only one (p) exists in South Africa, and none in south Asia and the Middle East. The accelerator of choice should provide protons with energy 75 MeV for eye treatment and 250 MeV for body treatment. Four treatment rooms are suggested: two with isocentric gantries, one with fixed beams and one for development. Passive scanning is recommended. The project can serve Middle East and North Africa with ∼ 400 million populations. The annual capacity of the project is estimated as 1,100 to be compared with expected radiation cases eligible for proton cancer treatment of not less than 200,000

  15. Back from the Brink with Something for Everyone - The Final Executed Memorandum of Agreement for Interpretation of the East Tennessee Technology Park and the K-25 Building - 13370

    International Nuclear Information System (INIS)

    Cusick, Lesley T.

    2013-01-01

    When the Environmental Management (EM) Program at the Oak Ridge Office of the Department of Energy (DOE) began its major decontamination and decommissioning (D and D) program activities in the mid-1990's, it was understood that the work to demolish the gaseous diffusion process buildings at the K-25 Site, as it was then known, would be challenging. Nothing of that size and breadth had ever been done within the DOE complex and the job brought about a full menu of unique attributes: radiological contamination with enriched materials entrained in certain areas of the system, a facility that was never designed not to operate but had been shut down since 1964, and a loyal following of individuals and organizations who were committed to the physical preservation of at least some portion of the historic Manhattan Project property. DOE was able to solve and resolve the issues related to nuclear materials management, contamination control, and determining the best way to safely and efficiently deconstruct the massive building. However, for a variety of reasons, resolution of the historic preservation questions - what and how much to preserve, how to preserve it, where to preserve it, how to interpret it, how much to spend on preservation, and by and for whom preservation should occur - remained open to debate for over a decade. After a dozen years, countless meetings, phone calls, discussions and other exchanges, and four National Historic Preservation Act (NHPA) [1] Memoranda of Agreement (MOA), a final MOA [2] has been executed. The final executed MOA's measures are robust, creative, substantive, and will be effective. They include a multi-story replica of a portion of the K-25 Building, the dedication of the K-25 Building footprint for preservation purposes, an equipment building to house authentic Manhattan Project and Cold War equipment, a virtual museum, an on-site history center, a grant to preserve a historically-significant Manhattan Project-era hotel in Oak Ridge

  16. Back from the Brink with Something for Everyone - The Final Executed Memorandum of Agreement for Interpretation of the East Tennessee Technology Park and the K-25 Building - 13370

    Energy Technology Data Exchange (ETDEWEB)

    Cusick, Lesley T. [Restoration Services, Inc. (United States)

    2013-07-01

    When the Environmental Management (EM) Program at the Oak Ridge Office of the Department of Energy (DOE) began its major decontamination and decommissioning (D and D) program activities in the mid-1990's, it was understood that the work to demolish the gaseous diffusion process buildings at the K-25 Site, as it was then known, would be challenging. Nothing of that size and breadth had ever been done within the DOE complex and the job brought about a full menu of unique attributes: radiological contamination with enriched materials entrained in certain areas of the system, a facility that was never designed not to operate but had been shut down since 1964, and a loyal following of individuals and organizations who were committed to the physical preservation of at least some portion of the historic Manhattan Project property. DOE was able to solve and resolve the issues related to nuclear materials management, contamination control, and determining the best way to safely and efficiently deconstruct the massive building. However, for a variety of reasons, resolution of the historic preservation questions - what and how much to preserve, how to preserve it, where to preserve it, how to interpret it, how much to spend on preservation, and by and for whom preservation should occur - remained open to debate for over a decade. After a dozen years, countless meetings, phone calls, discussions and other exchanges, and four National Historic Preservation Act (NHPA) [1] Memoranda of Agreement (MOA), a final MOA [2] has been executed. The final executed MOA's measures are robust, creative, substantive, and will be effective. They include a multi-story replica of a portion of the K-25 Building, the dedication of the K-25 Building footprint for preservation purposes, an equipment building to house authentic Manhattan Project and Cold War equipment, a virtual museum, an on-site history center, a grant to preserve a historically-significant Manhattan Project-era hotel in

  17. East coast development overview : why now?

    International Nuclear Information System (INIS)

    Anderson, J.

    1998-01-01

    Progress achieved in developing East coast natural gas markets was discussed. Mobil, Shell, Imperial, Mosbacher and Nova Scotia Resources received the go-ahead for the Sable Offshore Energy Project last December. The owner companies created Sable Offshore Energy Inc. (SOE Inc.) for managing and operating the development. Mobil (which has 50 per cent of the total invested in the Sable offshore project) and their partners will spend an average of one million dollars per day in Nova Scotia over the next 22 months in order to ensure that they will deliver gas from the offshore site by late 1999. That is in addition to the 400 million dollars already spent by the consortium in the province of Nova Scotia. Job creation, of particular significance in the Atlantic provinces, is also expected to be a significant factor in lifting the GDP of Nova Scotia to three per cent in 1998. According to an estimate by the Bank of Nova Scotia, the Sable and pipeline projects alone will create more than 7,500 spin-off jobs. The five major factors which make eastern Canada development possible and economically attractive are: (1) resource potential, (2) technological advancements, (3) alliances, (4) market proximity, and (5) the rapidly expanding global market for natural gas. Each of these factors and how they impact on the East coast natural gas industry were discussed in some detail

  18. An archaeological reconnaissance of a 14 mile section of the East Fork Poplar Creek for the Environmental Restoration Project, Anderson and Roane Counties, Tennessee

    International Nuclear Information System (INIS)

    DuVall, G.D.

    1993-01-01

    At the request of the US Army Corps of Engineers, Nashville District, Nashville, Tennessee, an archaeological reconnaissance of the potential impact areas of the Environmental Restoration Project (ERP) along the East Fork Poplar Creek was conducted during the period December 16, 1991, and March 3, 1992. The reconnaissance was conducted in response to environmental evaluations as a result of the accidental spillage of approximately 293,000 pounds of mercury, radionuclides, heavy metals and other compounds. The reconnaissance to assess adverse impacts to cultural resources located within the boundaries of Federally-licensed, permitted, funded or assisted projects was conducted in compliance with the National Historic Preservation Act of 1966, National Environmental Policy Act of 1969 and Executive Order 11593

  19. Hispanic Vocational Exploration Project. Final Report.

    Science.gov (United States)

    Centro De La Comunidad, Inc., New London, CT.

    During its second year, the Hispanic Vocational Exploration Project recruited eighth and ninth grade Hispanic youth for a four-week cycle, after-school, career exploratory program at Southeastern Regional Vocational Technical School, Groton, Connecticut. A series of career education workshops was the other major project activity. Supportive…

  20. Peace, petroleum and economic development in the Middle East

    International Nuclear Information System (INIS)

    Anon.

    1995-01-01

    The first obstacle which is still on the way to lead to a durable peace is the issue of negotiations between Israel and Syria and Lebanon, but it is only a question of time. Arab and Israeli people make relations in all kind of areas: industry, agriculture, finances, tourism, trade. Hope of economic development were well illustrated by big projects such roads and trains networks, interconnection of electric networks. An important challenge to realize these works is to collect the money which is necessary to their realization; the project of a bank for the development in the middle east, helped by Usa, is not welcome for arab countries of the Gulf. They think a new bank is not necessary but in reality they are afraid that the loans give profits only to Israeli people. In the same time, it does not seem possible to increase the petroleum prices when Opec and non Opec countries disagree and Usa and industrialized countries are not disposed to pay more for their energy; finally if the peace is necessary to allow an economic development in this area, it is not sufficient to solve the poverty problem, frustrations and social tensions, which are now the principle menaces in this area for the policy stability

  1. Radiological and environmental consequences. Final report of the Nordic Nuclear Safety Research project BOK-2

    International Nuclear Information System (INIS)

    Palsson, S.E.

    2002-11-01

    Final report of the Nordic Nuclear Safety Research project BOK-2, Radiological and Environmental Consequences. The project was carried out 1998-2001 with participants from all the Nordic countries. Representatives from the Baltic States were also invited to some of the meetings and seminars. The project consisted of work on terrestrial and marine radioecology and had a broad scope in order to enable participation of research groups with various fields of interest. This report focuses on the project itself and gives a general summary of the studies undertaken. A separate technical report summarises the work done by each research group and gives references to papers published in scientific journals. The topics in BOK-2 included improving assessment of old and recent fallout, use of radionuclides as tracers in Nordic marine areas, improving assessment of internal doses and use of mass spectrometry in radioecology. (au)

  2. The ICE-CREAM Project : final report

    NARCIS (Netherlands)

    Janse, M.D.

    2004-01-01

    The ICE-CREAM project has been investigating how to make compelling experiences for end-users based on enabling technologies for interactive media, such as DVB-MHP, Internet and MPEG-4. The goals of the project were to extend the notion of interaction, to exploit domestic activities and familiar

  3. Geologic and Engineering Characterization of East Ford Field, Reeves County, Texas

    Energy Technology Data Exchange (ETDEWEB)

    Dutton, Shirley P.; Flanders, William A.; Guzman, Jose I.; Zirczy, Helena

    1999-08-16

    The objective of this Class III project is to demonstrate that detailed reservoir characterization of slope and basin clastic reservoirs in sandstones of the Delaware Mountain Group in the Delaware Basin of West Texas and New Mexico is a cost-effective way to recover a higher percentage of the original oil in place through geologically based field development. The project focused on reservoir characterization of the East Ford unit, a representative Delaware Mountain Group field that produces from the upper Bell Canyon Formation (Ramsey Sandstone). The field, discovered in 1960, is operated by Oral Petco, Inc., as the East Ford unit: it contained an estimated 18.4 million barrels (MMbbl) of original oil in place.

  4. All projects related to | Page 472 | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Region: Middle East, North of Sahara, South of Sahara, Central Asia, Far East Asia, South Asia, Iran, Iraq, Jordan, Lebanon, Morocco, Egypt, Palestine, Israel. Program: Foundations for Innovation. Total Funding: CA$ 500,000.00. Governance, Reform and Islamism in the Middle East and North Africa. Project. Over the past ...

  5. Global projections of extreme sea levels in view of climate change

    Science.gov (United States)

    Vousdoukas, M. I.; Feyen, L.; Voukouvalas, E.; Mentaschi, L.; Verlaan, M.; Jevrejeva, S.; Jackson, L. P.

    2017-12-01

    Global warming is expected to drive increasing extreme sea levels (ESLs) and flood risk along the world's coasts. The present contribution aims to present global ESL projections obtained by combining dynamic simulations of all the major ESL components during the present century, considering the latest CMIP5 projections for RCP4.5 and RCP8.5. Baseline values are obtained combining global re-analyses of tides, waves, and storm surges, including the effects of tropical cyclones. The global average RSLR is projected around 20 and 24 cm by the 2050s under RCP4.5 and RCP8.5, respectively and is projected to reach 46 and 67 cm by the year 2100. The largest increases in MSL are projected along the South Pacific, Australia and West Africa, while the smaller RSLR is projected around East North America, and Europe. Contributions from waves and storm surges show a very weak increasing global trend, which becomes statistically significant only towards the end of the century and under RCP8.5. However, for areas like the East China Sea, Sea of Japan, Alaska, East Bering Sea, as well as the Southern Ocean, climate extremes could increase up to 15%. By the end of this century the 100-year event ESL along the world's coastlines will on average increase by 48 cm for RCP4.5 and 75 cm for RCP8.5. The strongest rise is projected along the Southern Ocean exceeding 1 m under RCP8.5 by the end of the century. Increase exceeding 80 cm is projected for East Asia, West North America, East South America, and the North Indian Ocean. Considering always the business as usual and the year 2100, the lowest increase in ESL100 is projected along the East North America and Europe (below 50 cm). The present findings indicate that, under both RCPs, by the year 2050 the present day 100-year event will occur every 5 years along a large part of the tropics, rendering coastal zones exposed to intermittent flood hazard.

  6. The final disposal of radioactive wastes as social, political and scientific project - an introduction

    International Nuclear Information System (INIS)

    Brunnengraeber, Achim

    2015-01-01

    The nuclear power production that was productive for two generations produces radioactive wastes that will be a hazardous and financial burden for many future generations. Science, politics, industry and the society are responsible to find a successful solution for the project of final disposal of radioactive wastes. With the fast development of renewable energies with the perspectives of sustainability and other advantages nuclear power will not have a remarkable future. The search for a final repository site is a tremendous governmental, economic and public challenge but can also be seen as a social chance. Democracy could be enforced by this process, public commitment, transparency, co-determination, confidence in political processes are indispensible premises.

  7. The PST Project, Willie Herron's Street Mural Asco East of No West (2011 and the Mural Remix Tour: Power Relations on the Los Angeles Art Scene

    Directory of Open Access Journals (Sweden)

    Eva Zetterman

    2014-06-01

    Full Text Available This article departs from the huge art-curating project Pacific Standard Time: Art in L.A., 1945-1980, a Getty funded initiative running in Southern California from October 2011 to April 2012 with a collaboration of more than sixty cultural institutions coming together to celebrate the birth of the L.A. art scene. One of the Pacific Standard Time (PST exhibitions was Asco: Elite of the Obscure, A Retrospective, 1972-1987, running from September to December 2011 at the Los Angeles County Museum of Art (LACMA. This was the first retrospective of a conceptual performance group of Chicanos from East Los Angeles, who from the early 1970s to the mid 1980s acted out critical interventions in the politically contested urban space of Los Angles. In conjunction with the Asco retrospective at LACMA, the Getty Foundation co-sponsored a new street mural by the Chicano artist Willie Herron, paying homage to his years in the performance group Asco. The PST exhibition program also included so-called Mural Remix Tours, taking fine art audiences from LACMA to Herron's place-specific new mural in City Terrace in East Los Angeles. This article analyze the inclusion in the PST project of Herron's site-specific mural in City Terrace and the Mural Remix Tours to East Los Angeles with regard to the power relations of fine art and critical subculture, center and periphery, the mainstream and the marginal. As a physical monument dependent on a heavy sense of the past, Herron's new mural, titled Asco: East of No West, transforms the physical and social environment of City Terrace, changing its public space into an official place of memory. At the same time, as an art historical monument officially added to the civic map of Los Angeles, the mural becomes a permanent reminder of the segregation patterns that still exist in the urban space of Los Angeles.

  8. The final focus test beam project

    International Nuclear Information System (INIS)

    Burke, D.

    1991-05-01

    An overview is given of the Final Focus Test Beam (FFTB) that is being constructed as a prototype final focus system for a future electron-positron linear collider. This beam line will use as input the 50 GeV electron beam from the SLC linac, and is designed to reduce the transverse dimensions of the beam spot at the focal point to 1 μm. 5 refs., 2 figs., 1 tab

  9. Danish Interests in Regional Security Institutions in East Africa

    DEFF Research Database (Denmark)

    Nordby, Johannes Riber; Jacobsen, Katja

    2013-01-01

    For the past decade, peace and security in East Africa have gained increasing focus internationally. The region has experienced armed conflicts, civil wars, rebellion, drought and famine. Yet, at the same time, there is an emerging ambition among a number of African states to handle security issues...... on the continent independently. Such ambitions have fostered a variety of military capacity building programmes supported by external donors. The present report explores how up until now Denmark has sought to contribute to strengthening political and military security in East Africa. This has mainly been done...... through capacity building projects anchored in different regional security institutions. The report illuminates some of the risks that such capacity building projects might confront. Furthermore the report points out some of the challenges that exist in the cooperation between the Ministry of Foreign...

  10. Project Elderly. Interim and Final Reports.

    Science.gov (United States)

    Miami-Dade Community Coll., FL.

    This report examines Project Elderly, a project developed to provide job possibilities for the older adult in the labor market in metropolitan Miami (FL). A survey questionnaire was developed to (1) assess the opportunities of the elderly for re-entry into volunteer and paid employment positions; (2) determine the extent of the senior population…

  11. FutureGen 2.0 Pipeline and Regional Carbon Capture Storage Project - Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Burger, Chris [Patrick Engineering Inc., Lisle, IL (United States); Wortman, David [Patrick Engineering Inc., Lisle, IL (United States); Brown, Chris [Battelle Memorial Inst., Richland, WA (United States); Hassan, Syed [Gulf Interstate Engineering, Houston, TX (United States); Humphreys, Ken [Futuregen Industrial Alliance, Inc., Washington, D.C. (United States); Willford, Mark [Futuregen Industrial Alliance, Inc., Washington, D.C. (United States)

    2016-03-31

    The U.S. Department of Energy’s (DOE) FutureGen 2.0 Program involves two projects: (1) the Oxy-Combustion Power Plant Project and (2) the CO2 Pipeline and Storage Project. This Final Technical Report is focused on the CO2 Pipeline and Storage Project. The FutureGen 2.0 CO2 Pipeline and Storage Project evolved from an initial siting and project definition effort in Phase I, into the Phase II activity consisting permitting, design development, the acquisition of land rights, facility design, and licensing and regulatory approvals. Phase II also progressed into construction packaging, construction procurement, and targeted early preparatory activities in the field. The CO2 Pipeline and Storage Project accomplishments were significant, and in some cases unprecedented. The engineering, permitting, legal, stakeholder, and commercial learnings substantially advance the nation’s understanding of commercial-scale CO2 storage in deep saline aquifers. Voluminous and significant information was obtained from the drilling and the testing program of the subsurface, and sophisticated modeling was performed that held up to a wide range of scrutiny. All designs progressed to the point of securing construction contracts or comfort letters attesting to successful negotiation of all contract terms and willing execution at the appropriate time all major project elements – pipeline, surface facilities, and subsurface – as well as operations. While the physical installation of the planned facilities did not proceed in part due to insufficient time to complete the project prior to the expiration of federal funding, the project met significant objectives prior to DOE’s closeout decision. Had additional time been available, there were no known, insurmountable obstacles that would have precluded successful construction and operation of the project. Due to the suspension of the project, site restoration activities were developed and the work was accomplished. The site restoration

  12. Collaboration in Cultural Heritage Digitisation in East Asia

    Science.gov (United States)

    Lee, Hyuk-Jin

    2010-01-01

    Purpose: The purpose of this paper is to review the current status of collaboration in cultural heritage preservation in East Asia, including digital projects, and to suggest practical improvements based on a cultural structuralism perspective. Design/methodology/approach: Through exploratory research, the paper addresses aspects for successful…

  13. Near East/South Asia Report

    Science.gov (United States)

    1987-03-26

    all forces having an interest m the solution and an interest in society there is an alliance and partnership to confront the danger overtaking the...must be partnership and consensus in order to reach a solution. I doubt that President al-Jumayyil can at this stage settle affairs in East Beirut by...mountains, followed by another, in 1977 in Dhofar. ! Three conservation projects were undertaken, with the sup- port of the WWF and IUCN, which

  14. ND-REAP/DOE cooperative project: final report

    Energy Technology Data Exchange (ETDEWEB)

    1979-01-01

    The impacts of energy-related developments in North Dakota are having profound effects on the state. Among the most significant of these effects are those on the state's economy and its population. Knowledge of the total environmental effects of development is a necessary prerequisite for effective planning and decision making. This final report addresses the conceptual design and functional evolution of the Regional Environmental Assessment Program, the results of the REAP/DOE Cooperative Effort, as well as evolution of the REAP/DOE effort and recommendations for future directions. The Economic Demographic (E-D) Model was developed to give North Dakota decision makers a tool with which to evaluate the impacts of coal development. It projects social, economic, and characteristics of North Dakota. Refinements and expansion of the model are discussed in Section 1. Section 2 provides an evaluation of the model as applied to other states. Section 3 identifies and evaluates the use of REAP data and capabilities to date. The REAP Resources Reference System R/sup 3/S was developed to provide access to information systems and to past research and present studies about aspects of North Dakota. It is a computer-based library reference system. Its status and expansion potential is covered in Section 4. Section 5 makes recommendations for future efforts.

  15. Project Final Report: HPC-Colony II

    Energy Technology Data Exchange (ETDEWEB)

    Jones, Terry R [ORNL; Kale, Laxmikant V [University of Illinois, Urbana-Champaign; Moreira, Jose [IBM T. J. Watson Research Center

    2013-11-01

    This report recounts the HPC Colony II Project which was a computer science effort funded by DOE's Advanced Scientific Computing Research office. The project included researchers from ORNL, IBM, and the University of Illinois at Urbana-Champaign. The topic of the effort was adaptive system software for extreme scale parallel machines. A description of findings is included.

  16. Project CAREER/CAN. Final Evaluation Report.

    Science.gov (United States)

    National Educational Evaluation Services, Inc., Chestnut Hill, MA.

    A description and evaluation of (1) the development of the 4-column process which completes the behavioral objective data base, (2) the development of the computer retrieval capability, and (3) the pilot testing of the product in high school classrooms are included in this summative evaluation of Project CAREER/CAN. (Goals of Project CAREER/CAN,…

  17. Final report of the project performance assessment and economic evaluation of nuclear waste management

    International Nuclear Information System (INIS)

    Rasilainen, K.; Anttila, M.; Hautojaervi, A.

    1993-05-01

    The publication is the final report of project Performance Assessment and Economic Evaluation of Nuclear Waste Management (TOKA) at the Nuclear Engineering Laboratory of VTT (Technical Research Centre of Finland), forming part of the Publicly Financed Nuclear Waste Management Research Programme (JYT). The project covers safety and cost aspects of all phases of nuclear waste management. The main emphasis has been on developing an integrated system of models for performance assessment of nuclear waste repositories. During the four years the project has so far been in progress, the total amount of work has been around 14 person-years. Computer codes are the main tools in the project, they are either developed by the project team or acquired from abroad. In-house model development has been especially active in groundwater flow, near-field and migration modelling. The quantitative interpretation of Finnish tracer experiments in the laboratory and natural analogue studies at Palmottu support performance assessments via increased confidence in the migration concepts used. The performance assessment philosophy adopted by the team consists of deterministic modelling and pragmatic scenario analysis. This is supported by the long-term experience in practical performance assessment of the team, and in theoretical probabilistic modelling exercises. The radiological risks of spent fuel transportation from the Loviisa nuclear power plant to Russia have been analysed using a probabilistic computer code and Finnish traffic accident statistics. The project assists the authorities in the annual assessment of utility estimates of funding needs for future nuclear waste management operations. The models and methods used within the project are tested in international verification/validation projects

  18. Far East Asia | Page 96 | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Far East Asia. Extrême-Orient. Read more about Toward an Innovation-led Development Path in the Philippines. Language English. Read more about Vers un développement axé sur l'innovation aux Philippines. Language French. Read more about Evaluating a Real-Time Bio Surveillance Program : Pilot Project.

  19. Collaboration with East African security organisations

    DEFF Research Database (Denmark)

    Nordby, Johannes Riber; Jacobsen, Katja L.

    2012-01-01

    of the concept. At the same time the three organisations represent different constellations of member nations and thus different national interests, and locally they have different legitimacy and political strength. Thus, when choosing collaboration partners for a security project it is not simply a question......When it comes to understanding the concept of security and the way fragile security situations should be solved, the difference is big. While EASF – the East African Standby Force – is a regular military force with a rather traditional, military perception of the concept of security, EAC (East...... African Community) and IGAD (Intergovernmental Authority on Development) have broader perceptions of the concept. According to EAC, security also concerns matters such as policy reform, legislation, education and infrastructure. IGAD considers food security and environmental and economic issues as part...

  20. Decontamination of hot cells K-1, K-3, M-1, M-3, and A-1, M-Wing, Building 200: Project final report Argonne National Laboratory-East

    International Nuclear Information System (INIS)

    Cheever, C.L.; Rose, R.W.

    1996-09-01

    The purpose of this project was to remove radioactively contaminated materials and equipment from the hot cells, to decontaminate the hot cells, and to dispose of the radioactive waste. The goal was to reduce stack releases of Rn-220 and to place the hot cells in an emptied, decontaminated condition with less than 10 microSv/h (1 mrem/h) general radiation background. The following actions were needed: organize and mobilize a decontamination team; prepare decontamination plans and procedures; perform safety analyses to ensure protection of the workers, public, and environment; remotely size-reduce, package, and remove radioactive materials and equipment for waste disposal; remotely decontaminate surfaces to reduce hot cell radiation background levels to allow personnel entries using supplied air and full protective suits; disassemble and package the remaining radioactive materials and equipment using hands-on techniques; decontaminate hot cell surfaces to remove loose radioactive contaminants and to attain a less than 10 microSv/h (1 mrem/h) general background level; document and dispose of the radioactive and mixed waste; and conduct a final radiological survey

  1. Characterization of HIV Transmission in South-East Austria.

    Science.gov (United States)

    Hoenigl, Martin; Chaillon, Antoine; Kessler, Harald H; Haas, Bernhard; Stelzl, Evelyn; Weninger, Karin; Little, Susan J; Mehta, Sanjay R

    2016-01-01

    To gain deeper insight into the epidemiology of HIV-1 transmission in South-East Austria we performed a retrospective analysis of 259 HIV-1 partial pol sequences obtained from unique individuals newly diagnosed with HIV infection in South-East Austria from 2008 through 2014. After quality filtering, putative transmission linkages were inferred when two sequences were ≤1.5% genetically different. Multiple linkages were resolved into putative transmission clusters. Further phylogenetic analyses were performed using BEAST v1.8.1. Finally, we investigated putative links between the 259 sequences from South-East Austria and all publicly available HIV polymerase sequences in the Los Alamos National Laboratory HIV sequence database. We found that 45.6% (118/259) of the sampled sequences were genetically linked with at least one other sequence from South-East Austria forming putative transmission clusters. Clustering individuals were more likely to be men who have sex with men (MSM; pAustria had at least one putative inferred linkage with sequences from a total of 69 other countries. In conclusion, analysis of HIV-1 sequences from newly diagnosed individuals residing in South-East Austria revealed a high degree of national and international clustering mainly within MSM. Interestingly, we found that a high number of heterosexual males clustered within MSM networks, suggesting either linkage between risk groups or misrepresentation of sexual risk behaviors by subjects.

  2. All projects related to | Page 357 | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    The Status of Women in East Jerusalem. Project ... Topic: WOMEN'S RIGHTS, RESEARCH CAPACITY, MIDDLE EAST, GENDER DISCRIMINATION, SOCIAL ASPECTS. Region: ... Topic: RESEARCH NETWORKS, SMALL ENTERPRISES, MEDIUM ENTERPRISES, ... Innovative Approaches to Task Shifting in Mental Health.

  3. The Final Year Project (FYP) in Social Sciences: Establishment of Its Associated Competences and Evaluation Standards

    Science.gov (United States)

    Mateo, Joan; Escofet, Anna; Martinez, Francesc; Ventura, Javier; Vlachopoulos, Dimitrios

    2012-01-01

    This paper presents the fundamental characteristics of the Final Year Project (FYP), its associated competences and some evaluation standards that derived from a research conducted by the regional government of Catalonia (Spain) and the Catalan University Quality Assurance Agency. More analytically, the paper begins with the definition of the…

  4. PEER NGA-East Overview: Development of a Ground Motion Characterization Model (Ground Motion Prediction Equations) for Central and Eastern North America

    Science.gov (United States)

    Goulet, C. A.; Abrahamson, N. A.; Al Atik, L.; Atkinson, G. M.; Bozorgnia, Y.; Graves, R. W.; Kuehn, N. M.; Youngs, R. R.

    2017-12-01

    The Next Generation Attenuation project for Central and Eastern North America (CENA), NGA-East, is a major multi-disciplinary project coordinated by the Pacific Earthquake Engineering Research Center (PEER). The project was co-sponsored by the U.S. Nuclear Regulatory Commission (NRC), the U.S. Department of Energy (DOE), the Electric Power Research Institute (EPRI) and the U.S. Geological Survey (USGS). NGA-East involved a large number of participating researchers from various organizations in academia, industry and government and was carried-out as a combination of 1) a scientific research project and 2) a model-building component following the NRC Seismic Senior Hazard Analysis Committee (SSHAC) Level 3 process. The science part of the project led to several data products and technical reports while the SSHAC component aggregated the various results into a ground motion characterization (GMC) model. The GMC model consists in a set of ground motion models (GMMs) for median and standard deviation of ground motions and their associated weights, combined into logic-trees for use in probabilistic seismic hazard analyses (PSHA). NGA-East addressed many technical challenges, most of them related to the relatively small number of earthquake recordings available for CENA. To resolve this shortcoming, the project relied on ground motion simulations to supplement the available data. Other important scientific issues were addressed through research projects on topics such as the regionalization of seismic source, path and attenuation of motions, the treatment of variability and uncertainties and on the evaluation of site effects. Seven working groups were formed to cover the complexity and breadth of topics in the NGA-East project, each focused on a specific technical area. This presentation provides an overview of the NGA-East research project and its key products.

  5. Proposed modifications to the Lower Mokelumne River Project, California: FERC Project No. 2916-004. Final environmental impact statement

    Energy Technology Data Exchange (ETDEWEB)

    1993-11-01

    This final environmental impact statement (FEIS) has been prepared for the Federal Energy Regulatory Commission (Commission) to consider modifications to the existing Lower Mokelumne River Project (LMRP) (FERC Project No. 2916-004) in California. Chinook salmon and steelhead trout populations in the lower Mokelumne River have experienced recent declines and fish kills associated, in part, with discharges from Camanche Dam. The California Department of Fish and Game and the California Sportfishing Protection Alliance have asked the Commission to investigate and correct these problems. A wide range of different mitigation actions has been proposed by parties participating in the scoping of this proceeding, and staff has evaluated these proposed actions in this assessment. The staff is recommending a combination of flow and non-flow modifications to the existing license, including new minimum flow and minimum pool elevation requirements at Camanche Reservoir, ramping rates on dam releases, interim attraction and out-migrant spike flows, instream habitat improvements, and a series of studies and monitoring to determine feasible means for solving off-site fish passage problems.

  6. Final report of Phase 1 of the project: Assistance in developing the management of the petroleum sector in Timor-Leste 2002 - 2008

    Energy Technology Data Exchange (ETDEWEB)

    2009-05-15

    This is an institutional cooperation programme between the Norwegian Petroleum Directorate and The Ministry of Natural Resources, Minerals and Energy Policy in Timor-Leste, funded by the Oil for Development programme from the Norwegian Agency for Development Cooperation (NORAD). This final report is required according to the Country Agreement (Appendix 1), Article VII, Section 5: - East Timor shall submit to Norway a final report within 6 months after the completion of the Project. The report shall give a summary of outputs and activities undertaken, achievements compared to Goal and Objective and an assessment of the efficiency of the Project.- This report summarizes the planning of the Project, the activities and outputs, shows how project funds have been spent and discusses the results of the project. It is hoped that it also functions as a history book for an important factor in the early development of Timor-Leste's petroleum sector and for this long and high profiled Norwegian Development project. For the period 2003-2006, the Implementing institution in Timor-Leste was The Ministry of Natural Resources, Minerals and Energy Policy. From 2007 and for the rest of the project-period, the implementing institution was changed to the Secretariat of State for Natural Resources. The main tasks for the cooperation project were: Training on petroleum tax, accounting and basic finance topics for staff in the Petroleum Tax Division, MOPF; Analyze and give advice on possible tax effects and revenue effects regarding PSA agreements, gas pipeline and the implementation of new consolidated tax law; Help establish regular meetings with DNPG/TSDA and MOF to discuss current issues and improve flow of information between the different Timor-Leste petroleum authorities; Conduct and give advice on tax audits and desk audits Identify and give advice on current petroleum tax issues; Designed spreadsheets to facilitate overall monitoring of petroleum tax payments; New tax return

  7. The Implementation of Computer Data Processing Software for EAST NBI

    International Nuclear Information System (INIS)

    Zhang Xiaodan; Hu Chundong; Sheng Peng; Zhao Yuanzhe; Wu Deyun; Cui Qinglong

    2014-01-01

    One of the most important project missions of neutral beam injectors is the implementation of 100 s neutral beam injection (NBI) with high power energy to the plasma of the EAST superconducting tokamak. Correspondingly, it's necessary to construct a high-speed and reliable computer data processing system for processing experimental data, such as data acquisition, data compression and storage, data decompression and query, as well as data analysis. The implementation of computer data processing application software (CDPS) for EAST NBI is presented in this paper in terms of its functional structure and system realization. The set of software is programmed in C language and runs on Linux operating system based on TCP network protocol and multi-threading technology. The hardware mainly includes industrial control computer (IPC), data server, PXI DAQ cards and so on. Now this software has been applied to EAST NBI system, and experimental results show that the CDPS can serve EAST NBI very well. (fusion engineering)

  8. Novalignin project. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Stigsson, Lars [KIRAM AB, Saltsjoebaden (Sweden)

    2002-02-01

    The NovaFiber process is a new and sustainable technology for manufacturing of chemical pulp incorporating an efficient route for recovery of energy and pulping chemicals. The process is substantially sulphur chemicals free and this creates a great potential for recovery of sulphur free lignin for internal use as a fuel or export from the mill. The NovaLignin project has been launched to evaluate this potential from a technical and economical perspective. The NovaLignin research and development effort has been partly financed by NUTEK, Energimyndigheten and Mistra. A major feature of the new lignin is the absence of organically bound sulphur compounds in the material increasing the scope of potential uses for the lignin as a precursor for fine chemicals preparation or as a sulphur free biomass based fuel. Two major forest industry laboratories in Scandinavia have conducted the laboratory cooking and lignin extraction work in the present project. The lignin extracted from the NovaFiber process, NovaLignin, has been characterised and evaluated for use in different applications. The consequences of lignin extraction in different mill configurations with a recovery boiler or a black liquor gasification system for chemicals recovery is outlined below. The NovaFiber pulp mill is compared to a reference mill based on conventional kraft pulping on the same wood raw material. The mill capacity is 2000 t/d bleached softwood pulp. The lime kiln is fired with bark and the remaining falling bark is sold, or if there is a deficit, more bark is purchased. Initial laboratory studies conducted at ATO-DLO, the Netherlands, clearly show a great potential for NovaLignin as a functional additive in thermoplastics. NovaFiber and Kraft lignin act as an UV stabiliser for polyethylene at a comparable level as an expensive commercial stabiliser, such as HALS. This means that NovaFiber lignin has a very good price/performance ratio. Experiments show that NovaFiber lignin has good potential

  9. The Middle East and the Development of a Natural Gas World Market

    International Nuclear Information System (INIS)

    Honore, Anouk

    2006-01-01

    Gas resources can easily meet the projected increase in global demand. However, international trade in energy will need to expand to accommodate the growing mismatch between the location of demand or production. The Middle East nations emerge among the leading countries, with a reserve to production ratios exceeding 100 years. Although some have significant domestic consumption, this mostly leaves ample potential for exports. Most of the incremental output in the Middle East will be exported to North America, Europe and Asia, where indigenous production will fall behind demand on the short to medium term. The key question is whether the Middle East can live up to the consuming countries' supply expectations

  10. TWTF project criticality task force final review and assessment

    International Nuclear Information System (INIS)

    McKinley, K.B.; Cannon, J.W.; Wheeler, F.J.; Worle, H.A.

    1980-11-01

    The Transuranic Waste Treatment Facility (TWTF) is being developed to process transuranic waste, stored and buried at the Idaho National Engineering Laboratory, into a chemically inert, physically stable basalt-like residue acceptable at a federal repository. A task force was assembled by the TWTF Project Division to review and assess all aspects of criticality safety for the TWTF. This document presents the final review, assessments, and recommendations of this task force. The following conclusions were made: Additional criticality studies are needed for the entire envelope of feed compositions and temperature effects. Safe operating k/sub eff/'s need to be determined for process components. Criticality analyses validation experiments may also be required. SRP neutron interrogation should be replaced by DDT neutron interrogation. Accuracy studies need to be performed for the proposed assaying techniques. Time-correlated neutron monitoring needs to be mocked up for process components to prove feasibility and determine accuracy. The criticality control techniques developed for the TWTF conceptual design are in compliance with ERDAM 0530, including the Double Contingency Rule. Detailed procedures and controls need to be developed

  11. EAST93: Geophysical traverse from the Transantarctic Mountains to the Wilkes Basin, East Antarctica

    Science.gov (United States)

    ten Brink, Uri S.; Bannister, Stephen

    1995-01-01

    The East Antarctic Seismic Traverse (EAST93) was a geophysical traverse designed to image the bedrock under the East Antarctic ice cap. The traverse started 10 km west of the Taylor Dome drill site and 25 km west of the exposed bedrock of the Transantarctic Mountains at Lashly Mt. and ended 323 km west of the drill site over the Wilkes subglacial basin (Fig. 1). The traverse was located subparallel to latitude 78° S starting 30-50 km north of the Victoria Land Traverse (1958-1959). It was carried out jointly by the U.S. Geological Survey and Stanford University, U.S.A., together with the Institute of Geological and Nuclear Sciences, and Victoria University, New Zealand, during December 1993 and January 1994. The geophysical traverse included 236 km of multichannel seismic reflection data at 150 m shot intervals, 312.5 km of gravity data collected at intervals of 2.1 km, 312.5 km of magnetic data (total field intensity) collected at average intervals of 0.5 km, and 205 km of ground penetrating radar at intervals of 77 m. Relative locations and elevations of the entire traverse were measured at intervals of 150 m by traditional surveying methods, and tied to three absolute locations measured by the Global Positioning System (GPS). EAST93 is the first large-scale geophysical traverse on the polar plateau to our knowledge since the early 1960s. As such, the experiment presented several logistical challenges: (1) how to collect regional seismic profiles during the short Antarctic summer; (2) how to keep the scientific instruments running with minimal protection in harsh conditions; and (3) how to combine daily moves of camp with full days of work. The scientific and logistical aspects of the project proceeded, in general, according to plan despite the harsh conditions and our lack of previous experience on the polar plateau. Two unanticipated problems affected the progress of the work: the strong wind which slowed seismic acquisition, and the break-down of one of the

  12. Final workshop proceedings of the collaborative project ''Crystalline ROCK retention processes''

    Energy Technology Data Exchange (ETDEWEB)

    Rabung, Thomas; Garcia, David; Montoya Vanessa; Molinero, Jorge (eds.)

    2014-07-01

    The present document is the proceedings of the Final Workshop of the EURATOM FP7 Collaborative Project CROCK (Crystalline Rock Retention Processes). The key driver for initiation the CP CROCK, identified by national Waste Management Organizations, is the undesired high uncertainty and the associated conservatism with respect to the radionuclide transport in the crystalline host-rock far-field around geological disposal of high-level radioactive wastes.

  13. CERTS Microgrid Laboratory Test Bed - PIER Final Project Report

    Energy Technology Data Exchange (ETDEWEB)

    Eto, Joseph H.; Eto, Joseph H.; Lasseter, Robert; Schenkman, Ben; Klapp, Dave; Linton, Ed; Hurtado, Hector; Roy, Jean; Lewis, Nancy Jo; Stevens, John; Volkommer, Harry

    2008-07-25

    The objective of the CERTS Microgrid Laboratory Test Bed project was to enhance the ease of integrating small energy sources into a microgrid. The project accomplished this objective by developing and demonstrating three advanced techniques, collectively referred to as the CERTS Microgrid concept, that significantly reduce the level of custom field engineering needed to operate microgrids consisting of small generating sources. The techniques comprising the CERTS Microgrid concept are: 1) a method for effecting automatic and seamless transitions between grid-connected and islanded modes of operation; 2) an approach to electrical protection within the microgrid that does not depend on high fault currents; and 3) a method for microgrid control that achieves voltage and frequency stability under islanded conditions without requiring high-speed communications. The techniques were demonstrated at a full-scale test bed built near Columbus, Ohio and operated by American Electric Power. The testing fully confirmed earlier research that had been conducted initially through analytical simulations, then through laboratory emulations, and finally through factory acceptance testing of individual microgrid components. The islanding and resychronization method met all Institute of Electrical and Electronics Engineers 1547 and power quality requirements. The electrical protections system was able to distinguish between normal and faulted operation. The controls were found to be robust and under all conditions, including difficult motor starts. The results from these test are expected to lead to additional testing of enhancements to the basic techniques at the test bed to improve the business case for microgrid technologies, as well to field demonstrations involving microgrids that involve one or mroe of the CERTS Microgrid concepts.

  14. Wyoming coal-conversion project. Final technical report, November 1980-February 1982. [Proposed WyCoalGas project, Converse County, Wyoming; contains list of appendices with title and identification

    Energy Technology Data Exchange (ETDEWEB)

    None

    1982-01-01

    This final technical report describes what WyCoalGas, Inc. and its subcontractors accomplished in resolving issues related to the resource, technology, economic, environmental, socioeconomic, and governmental requirements affecting a project located near Douglas, Wyoming for producing 150 Billion Btu per day by gasifying sub-bituminous coal. The report summarizes the results of the work on each task and includes the deliverables that WyCoalGas, Inc. and the subcontractors prepared. The co-venturers withdrew from the project for two reasons: federal financial assistance to the project was seen to be highly uncertain; and funds were being expended at an unacceptably high rate.

  15. EuCARD final project report

    CERN Document Server

    Koutchouk, J P

    2014-01-01

    After four years of activity, EuCARD has most of its objectives fulfilled, with some new objectives added and a few others on excellent tracks while requiring additional time. The management has been active in reinforcing the collaborative links between partners and projects, contributing to the preparation of FP7-EuCARD2, initiating FP7-HiLumi-LHC Design Study, to favour sustained collaborations beyond EuCARD. An out-of-contract network has been successfully launched on laser plasma acceleration, to combine forces between accelerator, laser and plasma communities. Communication and dissemination activities have led to two highlights: Accelerating News, an accelerator R&D newsletter initiated by EuCARD and now common to all FP7 accelerator projects (over 1000 subscribers) and a series of monographs on accelerator sciences that is progressively finding its public. The scientific networks have more than fulfilled their initial objectives: roadmaps are defined for neutrino facilities, submitted to the Europe...

  16. Alligator Rivers Analogue Project. Final Report - Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Duerden, P [Australian Nuclear Science and Technology Organisation (ANSTO), Lucas Heights, NSW (Australia); Lever, D A [AEA Technology, Harwell (United Kingdom); Sverjensky, D A [Johns Hopkins Univ., Baltimore, MD (United States); Townley, L R [Commonwealth Scientific and Industrial Research Organisation (CSIRO), Wembley, WA (Australia). Div. of Water Resources

    1992-07-01

    This summary report, which highlights the work and findings of the Alligator Rivers Analogue Project (ARAP) is one of a series of 16 volumes, listed below. Detailed descriptions and results are provided in Volumes 2 to 16. Full acknowledgment to individual contributions is provided in the individual reports, and in Appendix I of this report. The findings from the technical studies are discussed in the context of assessments of the long-term performance of geological repositories for radioactive wastes, which are being undertaken in many countries. They are also considered in an integrated 'Scenario Development' approach, aimed to understand the formation of the ore deposit. Despite their inherent uncertainties, the findings provide a basis for assessing the way in which radionuclides will migrate in environments with a variety of geologic settings and over a range of different geologic timescales. Thus, section 2 of this report discusses the concept of using uranium deposits as natural analogues and refers to a number of such studies, including those at the Koongarra deposit in the Alligator Rivers Region of the Northern Territory of Australia. Section 3 reviews early scientific work in the Alligator Rivers Region and summarises the results of the analogue studies undertaken between 1981 and 1987 that were funded by the US Nuclear Regulatory Commission (USNRC) and the UK Department of the Environment (UKDoE). Section 4 describes the objectives of ARAP and the manner in which the study was conducted and provides a general outline of the project and a summary of the findings. A general description of the Koongarra ore deposit, the focus of ARAP, is provided in Section 5, with Sections 6-13 providing summaries of the work carried out to characterise the site in detail and provide data for modelling. Sections 14-18 discuss how this data was used in modelling and how the results may be applied for performance assessment studies. Finally, Section 19 considers the

  17. Alligator Rivers Analogue Project. Final Report - Volume 1

    International Nuclear Information System (INIS)

    Duerden, P.; Lever, D.A.; Sverjensky, D.A.; Townley, L.R.

    1992-01-01

    This summary report, which highlights the work and findings of the Alligator Rivers Analogue Project (ARAP) is one of a series of 16 volumes, listed below. Detailed descriptions and results are provided in Volumes 2 to 16. Full acknowledgment to individual contributions is provided in the individual reports, and in Appendix I of this report. The findings from the technical studies are discussed in the context of assessments of the long-term performance of geological repositories for radioactive wastes, which are being undertaken in many countries. They are also considered in an integrated 'Scenario Development' approach, aimed to understand the formation of the ore deposit. Despite their inherent uncertainties, the findings provide a basis for assessing the way in which radionuclides will migrate in environments with a variety of geologic settings and over a range of different geologic timescales. Thus, section 2 of this report discusses the concept of using uranium deposits as natural analogues and refers to a number of such studies, including those at the Koongarra deposit in the Alligator Rivers Region of the Northern Territory of Australia. Section 3 reviews early scientific work in the Alligator Rivers Region and summarises the results of the analogue studies undertaken between 1981 and 1987 that were funded by the US Nuclear Regulatory Commission (USNRC) and the UK Department of the Environment (UKDoE). Section 4 describes the objectives of ARAP and the manner in which the study was conducted and provides a general outline of the project and a summary of the findings. A general description of the Koongarra ore deposit, the focus of ARAP, is provided in Section 5, with Sections 6-13 providing summaries of the work carried out to characterise the site in detail and provide data for modelling. Sections 14-18 discuss how this data was used in modelling and how the results may be applied for performance assessment studies. Finally, Section 19 considers the

  18. EUDP project 'Low noise airfoil' - Final report

    Energy Technology Data Exchange (ETDEWEB)

    Bertagnolio, F. (ed.)

    2012-06-15

    This document summarizes the scientific results achieved during the EUDP-funded project 'Low-Noise Airfoil'. The goals of this project are, on one side to develop a measurement technique that permits the evaluation of trailing edge noise in a classical aerodynamic wind tunnel, and on the other side to develop and implement a design procedure to manufacture airfoil profiles with low noise emission. The project involved two experimental campaigns: one in the LM Wind Power wind tunnel, a classical aerodynamic wind tunnel, in Lunderskov (Denmark), the second one in the Virginia Tech Stability Wind Tunnel at the Aerospace and Ocean Engineering Department of Virginia Tech (Blacksburg, VA, USA), also a classical aerodynamic wind tunnel but equipped with an anechoic chamber that allow to perform acoustic measurements. On the theoretical side, the above experiments yield a series of model validations and improvements. In particular, the so-called TNO trailing edge noise model could be significantly improved by introducing turbulence anisotropy in its formulation, as well as the influence of the boundary layer mean pressure gradient. This two characteristics are inherent to airfoil flows but were neglected in the original approach. In addition, the experimental results are confronted to detailed Large Eddy Simulations of the airfoil flow giving more insight into the flow turbulence characteristics. The methodology which consists in measuring surface pressure spectra directly on the airfoil surface using flush-mounted microphones in order to evaluate far-field noise emission using additional theoretical results has been validated. This technique presents the advantage that it can easily be used in a classical aerodynamic wind tunnel and does not require the use of an anechoic facility. It was developed as a substitute to the original plan that consisted in measuring acoustic waves using hot-wire velocimetry. This last technique proved ineffective in the LM Wind

  19. Gender segregation and wage gap: an East-West comparison

    Czech Academy of Sciences Publication Activity Database

    Jurajda, Štěpán

    2005-01-01

    Roč. 3, 2-3 (2005), s. 598-607 ISSN 1542-4766 R&D Projects: GA ČR GA403/03/0340 Institutional research plan: CEZ:AV0Z70850503 Keywords : gender segregation * wage differences * East-West comparison Subject RIV: AH - Economics http://www.jstor.org/stable/40005002

  20. Denmark: Intervention Dilemma in South Harbour and Aalborg East

    DEFF Research Database (Denmark)

    Hansen, Jesper Rohr; Engberg, Lars A.

    2014-01-01

    a strategic leadership that will convince collaborators of the added value of the project, in order to change the status quo in the huge, fragmented suburban area of Aalborg East? For general background information concerning the context of the cases, the reader should consult the case-study descriptions...

  1. Monitoring as component for the decision making in final repository projects; Monitoring als Baustein fuer die Entscheidungsfindung in Endlagerprojekten

    Energy Technology Data Exchange (ETDEWEB)

    Kallenbach-Herbert, Beate; Alt, Stefan [Oeko-Institut e.V., Darmstadt (Germany)

    2012-12-15

    The monitoring in final radioactive waste repositories is performed by continuous or repeated measurements of technical and geologic parameters during long time periods. The collected data serve manifold purposes. The central focus is to provide fundamental information for the decision between and within the three phases of a final repository project. This means that monitoring is not only the sum of technical surveillance measures. Monitoring is also important for several sociopolitical decisions, for instance in case of closure of the repository. The article discusses possible objectives and shows the relevant technical aspects that are used deduce the requirements for an integrated monitoring concept. It is shown that a monitoring concept should be developed early enough involving all groups that are concerned by the waste disposal project.

  2. Final Project Report

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, Jin [University of California Santa Cruz; Zhao, Yiping [University of Georgia at Athens

    2014-12-05

    In this entire project period from 2005-2014, we have made significant progress in developing novel nanostructures of metal oxides (MOs) for solar hydrogen generation based on photoelectrochemical (PEC). Materials investigated are focused on 1D and 0D MO nanostructures of TiO2, WO3, ZnO, and Fe2O3 in conjunction with quantum dot (QD) sensitization and chemical doping (N or H) to alter their electronic band structures for both visible light absorption and for facilitating interfacial charge transport. In addition, we have used plasmonic metal nanostructures to enhance the PEC performance by improving light absorption of QDs via enhanced scattering of the plamonic metal. Most importantly, we have discovered a multipronged strategy for improving PEC performance: using plasmonic metal nanostructure to enhance light absorption, QDs to improve charge transfer, and chemical doping to increase charge transport in metal oxides for PEC. The combination is critical for overall high efficiency of PEC. This strategy is developed and demonstrated for the first time to our best knowledge.

  3. All projects related to | Page 97 | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    This project brings together and supports the uptake of maternal and child health research evidence into policies and practices in East Africa. Topic: MATERNAL AND CHILD HEALTH, POLICY MAKING, RESEARCH, DECISION MAKING, CANADA, EAST AFRICA. Region: South of Sahara, Ethiopia, Malawi, Mozambique, ...

  4. Analyzing sanitation characteristics in the urban slums of East Africa

    NARCIS (Netherlands)

    Szanto, G.L.; Letema, S.C.; Tukahirwa, J.; Mgana, S.; Oosterveer, P.J.M.; Buuren, van J.C.L.

    2012-01-01

    Urban slums in East Africa exhibit deplorable sanitary conditions. Despite (inter)national efforts, slum sanitation provision remains inadequate and the projected population growth forecasts a worsening of this crisis. The core of the problem is that available knowledge about the local feasibility

  5. Final report on the Project Research 'Assessment of Human Exposure to Environmental Radiation'

    International Nuclear Information System (INIS)

    1989-03-01

    This is the final report of the Project Research, 'Assessment of Human Exposure to Environmental Radiation', which has been conducted during the period 1983-1988. With the objective of assessing risk of environmental radioactivity to the population, the Project was divided into the following five research groups: (1) research for establishing calculation models and parameters in transfer of radionuclides from crop species through the human body; (2) research for analyzing transfer of radionuclides in the ocean and their contributions to exposure doses in the human body; (3) research for surveying accuracy of exposure models for the external body and respiratory organ and the influential factors; (4) research for determining uptake and biokinetics of radionuclides in the body; and (5) research for estimating and evaluating physical and physiological characteristics of reference Japanese man and the populaltion doses. Effluents from nuclear power plants and reprocessing plants were regarded as radionuclide sources in the water and atmosphere. (N.K.)

  6. Sesame Synchrotron Light for Experimental Sciences and Application in the Middle East

    International Nuclear Information System (INIS)

    El-Khalafawy, T.A.

    2003-01-01

    Anew international center for synchrotron radiation for research excellence for scientists from throughout the Middle East as well as other parts of the world could do for science what CERN has done for science in Europe. SESAME Project (Synchrotron Light for Experimental Sciences and Application in the Middle East ) under the umbrella for UNESCO establish the first major international research center as a cooperative venture by the scientists and governments of the Middle East, opened to all qualified scientists. It will be propeller for the regional economy while promoting the peaceful development of science and technology in the Middle East. SESAME will have as its centerpiece a synchrotron radiation based on a gift from Germany of the 0.8 GeV BESSYI storage ring and injector system which stopped operation at the end of November 1999

  7. Project study for the final disposal of intermediate toxicity radioactive wastes (low- and intermediate-level radioactive wastes) in geological formations

    International Nuclear Information System (INIS)

    1980-08-01

    The present report aimed to show variations in the construction- and operation-technical feasibility of a final repository for low- and intermediate-level radioactive wastes. This report represents the summary of a project study given under contract by Nagra with a view to informing a broader public of the technical conception of a final repository. Particular stress was laid on the treatment of the individual system elements of a repository concept during the construction, operation and sealing phases. The essential basis for the project study is the origin, composition and quantity of the wastes to be disposed. The final repository described in this report is foreseen for the reception of the following low- and intermediate-level solid radioactive wastes: wastes from the nuclear power plant operation; secondary wastes from the reprocessing of nuclear fuels; wastes from the decommissioning of nuclear power plants; wastes from research, medicine and industry

  8. Acoustic Monitoring of Beluga Whale Interactions with Cook Inlet Tidal Energy Project

    Energy Technology Data Exchange (ETDEWEB)

    Worthington, Monty [ORPC Alaska, LLC, Anchorage, AK (United States)

    2014-02-05

    FERC pilot project process. The Project compared results obtained from this method to results obtained from other passive hydrophone technologies and to visual observation techniques performed simultaneously. This Final Report makes recommendations on the best practice for future data collection, for ORPC’s work in Cook Inlet specifically, and for tidal power projects in general. This Project developed a marine mammal study design and compared technologies for hydroacoustic and visual data collection with potential for broad application to future tidal and hydrokinetic projects in other geographic areas. The data collected for this Project will support the environmental assessment of future Cook Inlet tidal energy projects, including ORPC’s East Foreland Tidal Energy Project and any tidal energy developments at Fire Island. The Project’s rigorous assessment of technology and methodologies will be invaluable to the hydrokinetic industry for developing projects in an environmentally sound and sustainable way for areas with high marine mammal activity or endangered populations. By combining several different sampling methods this Project will also contribute to the future preparation of a comprehensive biological assessment of ORPC’s projects in Cook Inlet.

  9. Poverty, Job Quality and Labor Market Dynamics in the Middle East ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Poverty, Job Quality and Labor Market Dynamics in the Middle East and North Africa ... This project will explore links between labour market dynamics and the quality ... public health, and health systems research relevant to the emerging crisis.

  10. Clean and efficient energy conversion processes (Cecon-project). Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-12-31

    The objectives of the work programme reported are the development and testing of two optimised energy conversion processes, both consisting of a radiant surface gas burner and a ceramic heat exchanger. The first sub-objective of the programme is related to industrial heating, drying and curing processes requireing low and medium heat fluxes. It is estimated that around one tenth of the total EC industrial energy use is associated with such processes. The majority of these processes currently use convection and conduction as the main heat transfer mechanisms and overall energy efficiencies are typically below 25%. For many drying and finishing processes (such as curing powder coatings and drying paints, varnishes, inks, and for the fabrication of paper and textiles), radiant heating can achieve much faster dyring rates and higher energy efficiency than convective heating. In the project new concepts of natural gas fired radiant heating have been investigated which would be much more efficient than the existing processes. One element of the programme was the evelopment of gas burners having enhanced radiant efficiencies. A second concerned the investigation of the safety of gas burners containing significant volumes of mixed gas and air. Finally the new gas burners were tested in combination with the high temperature heat exchanger to create highly efficient radiant heating systems. The second sub-objective concerned the development of a compact low cost heat exchanger capable of achieving high levels of heat recovery (up to 60%) which could be easily installed on industrial processes. This would make heat recovery a practical proposition on processes where existing heat recovery technology is currently not cost effective. The project will have an impact on industrial processes consuming around 80 MTOE of energy per year within EU countries (1 MTOE equals 41.8 PJ). The overall energy saving potential of the project is estimated to be around 22 MTOE which is around 10

  11. Project radon final report

    International Nuclear Information System (INIS)

    Ekholm, S.; Rossby, U.

    1990-01-01

    The main radiation problem in Sweden is due to radon in dwellings. At the Swedish State Power Board, R, D and D about radon has been going on since 1980. The work has concentrated on the important questions: How to find building with enhanced radon levels?; How to accurately decide on measures that will give adequate cleaning-up results, using appropriate measurement procedures; What cleaning-up effect is possible to achieve with an electro-filter?; and What cleaning-up effects are possible to achieve with different types of ventilation systems? The R, D and D-work, has been pursued in cooperation with universities of technology in Denmark and Finland, equipment manufacturers, consultants and authorities concerned. It was decided in December 1986 to give an offer to some SSPB-employees to investigate the radon situation of their dwellings, in order to test methods of measurement and cleaning-up under realistic conditions and to develop the methods to commercial maturity. The investigation was named 'Project Radon' and was carried out in three years with costs amounting to 1 M dollars. During the project less comprehensive radon measurements, named 'trace-measurements' were undertaken in about 1300 dwellings and more elaborate measurements, leading to suggestions of actions to be taken, in about 400 dwellings. Out of the suggestions, about 50 are carried out including control measurement after actions taken. The control measurement have shown that the ability to suggest appropriate actions is very successful - in just one case was a minor additional action necessary. The high reliability is achieved by always doing elaborate measurements before suggested mitigation method is decided on. (authors)

  12. The New Mexico Technology Deployment Pilot Project: A technology reinvestment project. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-11-01

    The New Mexico Technology Deployment Project (NMTDP) has been in operation for slightly more than two years. As one of the original TRP projects, NMTDP had the charter to develop and validate a new model for technology extraction which emphasized focused technology collaboration, early industry involvement, and a strong dual use commercialization and productization emphasis. Taken in total, the first two years of the NMTDP have been exceptionally successful, surpassing the goals of the project. This report describes the accomplishments and evolution of the NMTDP to date and discusses the future potential of the project. Despite the end of federal funding, and a subsequent reduction in level of effort, the project partners are committed to continuation of the project.

  13. Project Aprendizaje. Final Evaluation Report 1992-93.

    Science.gov (United States)

    Clark, Andrew

    This report provides evaluative information regarding the effectiveness of Project Aprendizaje, a New York City program that served 269 Spanish-speaking students of limited English proficiency (LEP). The project promoted parent and community involvement by sponsoring cultural events, such as a large Latin American festival. Students developed…

  14. Use of evidence-based practices in pregnancy and childbirth: South East Asia Optimising Reproductive and Child Health in Developing Countries project.

    Directory of Open Access Journals (Sweden)

    M Laopaiboon

    2008-07-01

    Full Text Available The burden of mortality and morbidity related to pregnancy and childbirth remains concentrated in developing countries. SEA-ORCHID (South East Asia Optimising Reproductive and Child Health In Developing countries is evaluating whether a multifaceted intervention to strengthen capacity for research synthesis, evidence-based care and knowledge implementation improves adoption of best clinical practice recommendations leading to better health for mothers and babies. In this study we assessed current practices in perinatal health care in four South East Asian countries and determined whether they were aligned with best practice recommendations.We completed an audit of 9550 medical records of women and their 9665 infants at nine hospitals; two in each of Indonesia, Malaysia and The Philippines, and three in Thailand between January-December 2005. We compared actual clinical practices with best practice recommendations selected from the Cochrane Library and the World Health Organization Reproductive Health Library. Evidence-based components of the active management of the third stage of labour and appropriately treating eclampsia with magnesium sulphate were universally practiced in all hospitals. Appropriate antibiotic prophylaxis for caesarean section, a beneficial form of care, was practiced in less than 5% of cases in most hospitals. Use of the unnecessary practices of enema in labour ranged from 1% to 61% and rates of episiotomy for vaginal birth ranged from 31% to 95%. Other appropriate practices were commonly performed to varying degrees between countries and also between hospitals within the same country.Whilst some perinatal health care practices audited were consistent with best available evidence, several were not. We conclude that recording of clinical practices should be an essential step to improve quality of care. Based on these findings, the SEA-ORCHID project team has been developing and implementing interventions aimed at increasing

  15. LNG [liquefied natural gas]: Fueling energy demand in the Far East

    International Nuclear Information System (INIS)

    Brown, R.L.

    1993-01-01

    An overview is presented of the supply and demand outlook for liquefied natural gas (LNG) in the far east, and the basic elements of an LNG supply project in Japan. Power generation is the primary market for LNG in the far east, due to a preference for energy supply diversity, large undeveloped gas resources, drastic improvements in power generation technology, and environmental advantages of natural gas. India and mainland China represent huge potential markets, and projects are under discussion to bring gas by pipeline from Iran or Qatar to both Pakistan or India. The economics of LNG plant development in Japan, including large ($4 billion for field and plant development) capital costs, long-term contracts, government involvement, and gas prices are discussed. Falling yen/dollar exchange rates have substantially bettered the Japanese economy in terms of gas prices. 11 figs., 2 tabs

  16. Womenʼs Burden of Disease and Injuries in East Azerbaijan

    Directory of Open Access Journals (Sweden)

    Sevil Hakimi

    2012-10-01

    Full Text Available Background: The aim of this study is assessment of burden of disease in East Azerbaijan women. Materials and Methods: In this project we used of disability adjusted life years (DALY as an index of burden of disease. Results: Cardiovascular disease, cancers and unintended injuries 71.98% of DALY for premature death. The 3 leading causes of YLD in East Azerbaijan province were: psycineurotic disorders, musculoskeletal and urogenital diseases.Conclusion: This study shows that YLL is 3 fold of YLD and this indicated to lower quality of life of women.

  17. Final audit report of remedial action construction at the UMTRA project site Rifle, Colorado. Rev. 1

    International Nuclear Information System (INIS)

    1997-01-01

    This final audit report summarizes the assessments performed by the U.S. Department of Energy (DOE) Environmental Restoration Division (ERD) and its Technical Assistance Contractor (TAC) of remedial action compliance with approved plans, specifications, standards, and 40 CFR Part 192 at the Rifle, Colorado, Uranium Mill Tailings Remedial Action (UMTRA) Project site. Remedial action construction was directed by the Remedial Action Contractor (RAC)

  18. Geochemical studies of the geothermal area East of the Jombo Hill intrusion Coast Province. Final report

    International Nuclear Information System (INIS)

    Tole, M.P.

    1985-09-01

    Geothermal resources in Kenya can be classified into two types; (i) High temperature geothermal resources, found within the Kenyan section of Rift Valley System, and (ii) Low temperature geothermal resources found outside the main Rift Valley System (figure 1). The high temperature geothermal resources have received first priority in research and development, and this has culminated in their exploitation at the Olkaria Geothermal Field which currently generates 45 MW of electricity, representing approximately 18% of Kenya's electricity requirements. Further research is directed at opening up electricity generating plants within the Rift Valley Geothermal Systems occuring between Lake Bogoria and Lake Magadi. The low temperature geothermal resources have received less attention in Kenya. In some countries, low temperature geothermal resources have been utilised for a number of domestic and commercial undertakings (table 1), among them (a) space heating (b) recreational baths (c) sugar refining. In china, low temperature (less than 90 o C) geothermal reservoirs have been used to provide energy for electrical generating plants (Reed and Bliss, 1983). An examination of the distribution of the low temperature geothermal sites in Kenya (figure 1) indicates that most of them could be easily utilised for one or more of the domestic and commercial activities mentioned above, by virtue of their location. In order that recommendations regarding the type of use that each of these hotsprings can be put to can be made, proper evaluation of each site must be made: in particular the underground hotwater temperatures as well as the extent of the geothermal field at each site must be evaluated. Geochemical studies provide the cheapest (most cost-effective) method of geothermal energy exploration. The purpose of this project was to determine the extent of the hot zone, as well as the underground reservoir temperatures in the geothermal field North East of the Jomo Hill intrusion

  19. All projects related to | Page 349 | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Region: Middle East, North of Sahara, South of Sahara, Central Asia, Far East Asia, South Asia, Algeria, Iraq, Jordan, Lebanon, Morocco, Egypt, Yemen, Bahrain, Kuwait. Program: Governance and Justice. Total Funding: CA$ 370,000.00. Arab Democracy Barometer. Project. The joint Arab Democracy Barometer constitutes ...

  20. All projects related to | Page 348 | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Region: Middle East, North of Sahara, South of Sahara, Central Asia, Far East Asia, South Asia, Algeria, Iraq, Jordan, Lebanon, Morocco, Egypt, Yemen, Bahrain, Kuwait. Program: Governance and Justice. Total Funding: CA$ 370,000.00. Arab Democracy Barometer. Project. The joint Arab Democracy Barometer constitutes ...

  1. All projects related to | Page 524 | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    2008-03-31

    Region: Egypt, Middle East, North of Sahara, South of Sahara, Central Asia, Far East Asia, South Asia, Lebanon, Morocco, Syria. Total Funding: CA$ 181,735.00. Networks : Empowering Communities through Telecentre Networking. Project. In 2006 IDRC's telecentre. Start Date: March 31, 2008. End Date: January 31, 2010.

  2. All projects related to | Page 64 | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Region: Middle East, North of Sahara, South of Sahara, Central Asia, Far East Asia, South Asia, North and Central America, South America, United Kingdom, Germany. Program: Employment and Growth. Total Funding: CA$ 2,255,300.00. Preventing early marriage in urban poor settlements in Bangladesh. Project.

  3. All projects related to | Page 557 | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    2007-03-11

    Regional East African Community Health Policy Initiative (REACH). Project. The Regional East African Community Health (REACH) policy initiative aims to improve health and health equity in Kenya, Tanzania and Uganda by facilitating the translation of health research into policy and practice. Start Date: March 11, 2007.

  4. The Oregon Applied Academics Project: Final Report

    Science.gov (United States)

    Pearson, Donna; Richardson, George B.; Sawyer, Jennifer M.

    2013-01-01

    This report contains the findings of the Oregon Applied Academics research and development project which spanned three academic years from 2010 through 2013. The overall purpose of the project was to develop and implement a technical math course that would meet graduation requirements and improve student performance. The State of Oregon has been…

  5. East Africa Evaluation Hub - Institute of Rural Reconstruction (IIRR ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Outcome Mapping is a planning, monitoring and evaluation methodology developed by IDRC and its partners. There is an active ... This project will adapt training resources to the East African context and build the capacity of IIRR to become a regional centre of Outcome Mapping training and support. It will also promote the ...

  6. A Community Approach to Youth Work in East London.

    Science.gov (United States)

    Cox, Derek M.

    Instituted as part of "Avenues Unlimited" (The Tower Hamlets Youth Project), a community development approach to youth services was attempted in the cosmopolitan inner city slum district of Spitalfields, East London. Efforts began in 1966 with a clean up campaign, a neighborhood club for parents and youth, and other activities by the…

  7. Draft project management update to the Iowa DOT Project Development Manual : final report.

    Science.gov (United States)

    2016-08-01

    This work supported drafting project management guidance for the Iowa Department of Transportation (DOT). The goal is to : incorporate a greater focus on project management in their project development process. : A technical advisory committee (TAC) ...

  8. East meets West: The influence of language and culture in clinical education.

    Science.gov (United States)

    Ladyshewsky, Richard

    1996-01-01

    The marketing of education in South East Asia has become big business for Australian Universities. Physiotherapy programs are not exempt from this marketing push, with increases in foreign student enrollment becoming commonplace. This raises numerous opportunities and dilemmas for those involved in physiotherapy clinical education. This action research project investigated the influence of language and culture on clinical education practices. Nine South East Asian undergraduate physiotherapy students and 11 clinical instructors were involved in this qualitative research project. A variety of issues were identified which have important ramifications for academics and clinical instructors. Cultural membership, issues of authority and respect, and language proficiency were identified as having a direct influence on the clinical education process. Strategies for dealing with these cross cultural teaching and learning challenges are discussed.

  9. 76 FR 28025 - East Maui Pumped Storage Water Supply LCC; Notice of Preliminary Permit Application Accepted for...

    Science.gov (United States)

    2011-05-13

    ... Storage Water Supply LCC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting... Act (FPA), proposing to study the feasibility of the East Maui Pumped Storage Water Supply Project to.... Bart M. O'Keeffe, East Maui Pumped Storage Water Supply LLC; P.O. Box 1916; Discovery Bay, CA 94505...

  10. 77 FR 64543 - Notice of Availability of the Final Environmental Impact Statement for the Mount Hope Project...

    Science.gov (United States)

    2012-10-22

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLNVB01000 L51100000.GN0000.LVEMF12CF010 241A; NVN-082096; NVN-084632; NVN-091272; 12-08807; MO 4500039779; TAS: 14X5017] Notice of Availability of the Final Environmental Impact Statement for the Mount Hope Project, Eureka County, NV Correction...

  11. The development of Middle Eastern gas: analyses of the graveyard of export projects

    International Nuclear Information System (INIS)

    Mabro, Robert

    1994-01-01

    There are three types of opportunities for gas developments in the Middle East. The first are those provided by the domestic energy market, the second by regional trade and the third by the potential for exports outside the region. The development of the full gas potential of the region, given the size of the reserves held by several countries, will only be possible through export. Of course, there is still room for the expansion of gas use within the producing countries and their regional neighbours but growth of domestic demand would not make a significant dent in the regional reserves before several decades. The potential for exports is constrained, however, by the uncertainty about future oil prices, the long lead-in time of major gas projects and the associated financing problems. There is a graveyard of gas export projects in the Middle East. New projects are continually conceived and then abandoned or indefinitely postponed. Even the famous Qatargas project which took so long to bring to the threshold of implementation appears in the present climate to be unattractive for both the country and the foreign investors involved. Gas in the Middle East will remain for a very long time a resource for an ever more distant future. There is still too much oil around for its price to rise to a support level for big gas projects in the Middle East. And there is no significant demand yet in Europe for Middle East oil which only leaves the Far East as a potential market. The paradox is that if gas resources are not developed ahead of needs, gas will not be available in sufficient volumes when required. (Author)

  12. Changes in Cold Surge Occurrence over East Asia in the Future: Role of Thermal Structure

    Directory of Open Access Journals (Sweden)

    Jin-Woo Heo

    2018-06-01

    Full Text Available The occurrence of wintertime cold surges (CSs over East Asia is largely controlled by the surface air temperature (SAT distribution at high latitudes and thermal advection in the lower troposphere. The thermodynamic background state over northeastern Asia is associated with the strength of the East Asian winter monsoon and the variation of Arctic Oscillation. This study assesses the importance of the SAT structure with thermal advection in determining the frequency of CS occurrences over East Asia through the analysis of nine atmosphere–ocean coupled global climate models participating in the Coupled Model Intercomparison Project Phase 5. The historical simulations can reproduce the observed typical characteristics of CS development. On the basis of this model performance, ensemble-averaged future simulations under the representative concentration pathway 8.5 project a reduction in CS frequency by 1.1 yr−1 in the late 21st century (2065–2095 compared to the present-day period (1975–2005. The major reason for less frequent CSs in the future is the weakened cold advection, caused by notable SAT warming over the northern part of East Asia. These results suggest that changes in the meridional SAT structure and the associated changes in thermal advection would play a more substantial role than local warming in determining future changes in the frequency of CS occurrences over East Asia.

  13. Bibliometric analysis of undergraduate final research projects in Nutrition courses in the state of Rio Grande do Norte, Brazil

    Directory of Open Access Journals (Sweden)

    Taiana Brito MENÊZES

    2016-02-01

    Full Text Available ABSTRACT Objective: To evaluate the profile of academic production of undergraduates in Nutrition courses in the state of Rio Grande do Norte, Brazil. Methods: The bibliometric study was conducted with undergraduate final research projects from five courses in Nutrition in the state of Rio Grande do Norte during 2013 and 2014. The following variables were collected: institution, title of project, number of authors, academic degree of the advisor, study design, area of study interest, type of study, study setting, submission to the ethics committee, and keywords. Pearson's Chi-square test was used to assess the variable area of study interest with a significance level at p≤0.05 and 95% confidence interval. Results: Of the 195 projects analyzed, 79.0% were developed at universities. We found a higher frequency of academic articles (68.2% developed by a single student (65.6%, advised by a professor with a Masters degree (57.9%, with a cross-sectional study design (48.2%, and without submission to the research ethics committee (49.2%. The mean adequacy of keywords was 50.0%. Conclusion: The quantitative approach was the most predominant characteristic of the final research projects and the most frequently researched area of knowledge was public health. The methodological approaches of the research projects were considered weak, which suggests the need to improve the quality of scientific methodology during undergraduate studies, considering the important benefits derive from researches as an active methodology.

  14. Hantavirus strains in East Africa related to Western African hantaviruses

    Czech Academy of Sciences Publication Activity Database

    Těšíková, Jana; Bryjová, Anna; Bryja, Josef; Lavrenchenko, L. A.; Goüy de Bellocq, Joëlle

    2017-01-01

    Roč. 17, č. 4 (2017), s. 278-280 ISSN 1530-3667 R&D Projects: GA ČR GCP502/11/J070 Institutional support: RVO:68081766 Keywords : bats * East Africa * hantavirus * phylogeny * rodents Subject RIV: EE - Microbiology, Virology OBOR OECD: Infectious Diseases Impact factor: 2.045, year: 2016

  15. Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Glasser, Alan H. [Fusion Theory and Computation Inc., Kingston, WA (United States)

    2018-02-02

    Final technical report on DE-SC0016106. This is the final technical report for a portion of the multi-institutional CEMM project. This report is centered around 3 publications and a seminar presentation, which have been submitted to E-Link.

  16. Final performance report for Project JEM

    Energy Technology Data Exchange (ETDEWEB)

    McKinney, M.J.; Jenkins, S.

    1997-12-31

    Project JEM (Jarvis Enhancement of Males) is a pre-college program directed toward stimulating disadvantaged, talented African American males in grades four, five, and six to attend college and major in mathematics, science, computer science, or related technical areas needed by the US Department of Energy. Twenty young African American male students were recruited from Gladewater Independent School District (ISD), Longview ISD, Hawkins ISD, Tyler ISD, Winona ISD and big Sandy ISD. Students enrolled in the program range from ages 10 to 13 and are in grades four, five and six. Student participants in the 1997 Project JEM Program attended Saturday Academy sessions and a four week intensive, summer residential program. The information here provides a synopsis of the activities which were conducted through each program component.

  17. Supercompaction/grouting demonstration project: Final report

    International Nuclear Information System (INIS)

    1987-01-01

    The purpose of this supercompaction demonstration project was to allow Martin Marietta Energy Systems, Inc. (The Company), to obtain cost analysis and performance information on volume reduction and waste encapsulation of solid, low-level contaminated waste (SLW). Ultimately, this information will be used to help define a waste disposal process for SLW that is acceptable to regulatory agencies and the US Department of Energy, Oak Ridge Operations (DOE/ORO). The technical objectives of the demonstration project were: (1) to obtain detailed performance data on each of the compacted barrels; (2) evaluate operating performance problems that may have occurred; (3) describe in detail the compaction and encapsulation process; and (4) to obtain operating cost data for the performance of this demonstration

  18. Ergo project builds up to full production

    International Nuclear Information System (INIS)

    Anon.

    1978-01-01

    The East Rand Gold and Uranium Company (Ergo) - planned on a massive scale to recover gold, uranium and sulphuric acid from the slimes dams of the East Rand - captured imaginations both from a financial and a technical viewpoint. Operationally, the commissioning of the project is now well under way and satisfying profits have already been recorded. A broad look at the background and the design is given

  19. Ergo project builds up to full production

    International Nuclear Information System (INIS)

    Anon.

    1979-01-01

    The East Rand Gold and Uranium Company (ERGO) - planned on a massive scale to recover gold, uranium and sulphuric acid from the slimes dams of the East Rand - captured imaginations both from a financial and a technical viewpoint. Operationally, the commissioning of the project is now well under way and satisfying profits have already been recorded. A broad look at the background and the design is given

  20. All projects related to Morocco | Page 3 | IDRC - International ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    ... South of Sahara. Total Funding: CA$ 90,512.00 ... Poverty, Job Quality and Labor Market Dynamics in the Middle East and North Africa. Project ... Moroccan Coastal Management : Building Capacity to Adapt to Climate Change. Project.

  1. Japan’s need for Russian oil and gas: A shift in energy flows to the Far East

    International Nuclear Information System (INIS)

    Motomura, Masumi

    2014-01-01

    This article examines the choices of Japan’s governmental institutions vis-à-vis Russian supplies of oil and gas. First, there is a perceived need to diversify the sources of crude oil in order to avoid too much reliance on the Middle East. Following the inauguration of the Sakhalin oil projects and completion of the ESPO pipeline, Russian crude oil is nearing a 10% share in the Japanese market. It is suggested that Russian crude oil supplies have been chosen due to their proximity, safety and flexibility, and their positive effect on Japan’s bargaining power in relation to crude suppliers in the Middle East. Second, Japan’s shift from nuclear to LNG in power generation after the Fukushima accident in March 2011 increased LNG imports by 25% in just two years. While Qatar expanded its market share the most, Russia also gained, even though it only had one operational LNG project in Sakhalin-2. Russian companies are now working on several LNG projects in Northeast Asia and the Arctic region. However, the resumption of nuclear power in Japan might have a negative impact on new Russian LNG projects. - Highlights: • Russia’s oil export will gain a 10% share in Japan. • Russian companies are accelerating several LNG projects in NE Asia. • Japan’s exploration activity in East Siberia has reached the investment stage

  2. Experiencing displacement : The transformation of women's spaces in (former) East Germany

    NARCIS (Netherlands)

    Horschelmann, K; van Hoven, B

    Based on a comparison of two different research projects carried out in (former) East Germany, this paper analyses the effects of German (re)unification and postsocialist transformation as a specific, gendered form of displacement. We show how new divisions between "public" and "private" have

  3. EUDP Project: Low Noise Airfoil - Final Report

    DEFF Research Database (Denmark)

    This document summarizes the scientific results achieved during the EUDP-funded project `Low-Noise Airfoil'. The goals of this project are, on one side to develop a measurement technique that permits the evaluation of trailing edge noise in a classical aerodynamic wind tunnel, and on the other side...... to develop and implement a design procedure to manufacture airfoil profiles with low noise emission. The project involved two experimental campaigns: one in the LM Wind Power wind tunnel, a classical aerodynamic wind tunnel, in Lunderskov (DK), the second one in the Virginia Tech Stability Wind Tunnel....... In particular, the so-called TNO trailing edge noise model could be significantly improved by introducing turbulence anisotropy in its formulation, as well as the influence of the boundary layer mean pressure gradient. This two characteristics are inherent to airfoil flows but were neglected in the original...

  4. Final report for the Department of Energy funded cooperative agreement ''Electronic Research Demonstration Project'' [University electronic research administration demonstration project

    Energy Technology Data Exchange (ETDEWEB)

    Rodman, John

    1998-07-31

    This is the final report for the Department of Energy (DOE) funded cooperative agreement ''Electronic Research Demonstration Project (DE-FC02-92ER35180)'' for the period August 1994-July 1998. The goal of the project, referred to as NewERA, was to demonstrate the use of open standards for electronic commerce to support research administration, otherwise referred to as Electronic Research Administration (ERA). The NewERA demonstration project provided a means to test interagency standards developed within the Federal Grant Electronic Commerce Committee, a group comprised of federal granting agencies. The NewERA program was initiated by DOE. NewERA was comprised of three separate, but related, ERA activities in preaward administration, postaward administration, and secure Internet commerce. The goal of New ERA was to demonstrate an open standard implementation of ERA using electronic data interchange, e-mail and Internet transaction security between grant applicants and DOE, along with t h e other participating agencies.

  5. Final hazard classification and auditable safety analysis for the 105-C Reactor Interim Safe Storage Project

    International Nuclear Information System (INIS)

    Rodovsky, T.J.; Larson, A.R.; Dexheimer, D.

    1996-12-01

    This document summarizes the inventories of radioactive and hazardous materials present in the 105-C Reactor Facility and the operations associated with the Interim Safe Storage Project which includes decontamination and demolition and interim safe storage of the remaining facility. This document also establishes a final hazard classification and verifies that appropriate and adequate safety functions and controls are in place to reduce or mitigate the risk associated with those operations

  6. West and East

    Directory of Open Access Journals (Sweden)

    Alexander Rappaport

    2017-12-01

    Full Text Available The topic “West-East” has a clear cultural and historical meaning. Orthodox temples face East. The way from West to East and from East to West is tens of thousands of kilometers long and has a special meaning. It differs from the way from North to South: the horizontal axes connect regions, while the vertical axis (Earth-Sky connects the worlds. The expansion of Eurasian tribes occurred along the East-West axis – the world horizontal way. Today the cultural memory of people in the East and West finds itself in the theatre of new dramas of existence and new forces. With the advances in electronic technologies, the world movements seem to have sunk in the depth of the chthonian past to come up anew to the surface of fantastic speeds and momentary connections. A new type of planetary landscape-space relation appears, giving no place for West and East.

  7. Energy market integration and regional institutions in east Asia

    International Nuclear Information System (INIS)

    Aalto, Pami

    2014-01-01

    This article assesses the case made for energy market integration in East Asia by comparing the role of institutions in South East Asia and North East Asia. The types and functions of institutions and their overall structure are examined in light of global energy market trends. In South East Asia, the shift attempted by ASEAN towards more competitive markets is hampered by the remaining statist variants of the trade institution and bilateral energy diplomacy, which, as regards transaction cost functions, are sub-optimal. As for institutions with order-creating functions, the unresolved status of sovereignty within ASEAN hampers regulatory harmonisation; the great power management institution has since ASEAN's establishment reduced conflicts without providing decisive leadership conducive to integration. North East Asia's dependence on global energy markets overshadows the regional integration potential of the diverse liberalisation efforts and interconnection projects. Bilateral energy diplomacies, new trilateral institutions combined with ‘Track Two’ institutions and remaining great power competition co-exist. In both regions the institutional structure allows for step-wise, technical infrastructure integration. The environmental stewardship institution co-exists with statist energy security and development objectives while it supports cooperation on green energy. The overall structure of informal institutions constrains deeper energy market integration in several ways. - Highlights: • The structures of institutions explain East Asian energy market integration. • Transaction costs are increased by statist trade institutions and bilateralism. • Order-creating institutions are sub-optimal for energy market integration. • Multi-level great power management offers limited leadership for integration. • The environmental stewardship institution supports cooperation on green energy

  8. Demonstration Project 111, ITS/CVO Technology Truck, Final Project Report

    Energy Technology Data Exchange (ETDEWEB)

    Gambrell, KP

    2002-01-11

    In 1995, the planning and building processes began to design and develop a mobile demonstration unit that could travel across the nation and be used as an effective outreach tool. In 1997, the unit was completed; and from June 1997 until December 2000, the Federal Highway Administration (FHWA)/Federal Motor Carrier Safety Administration (FMCSA) mobilized the Technology Truck, also known as Demonstration Project No. 111, ''Advanced Motor Carrier Operations and Safety Technologies.'' The project featured the latest available state-of-the-practice intelligent transportation systems (ITS) technologies designed to improve both the efficiency and safety of commercial vehicle operations (CVO). The Technology Truck was designed to inform and educate the motor carrier community and other stakeholders regarding ITS technologies, thus gaining support and buy-in for participation in the ITS program. The primary objective of the project was to demonstrate new and emerging ITS/CVO technologies and programs, showing their impact on motor carrier safety and productivity. In order to meet the objectives of the Technology Truck project, the FHWA/FMCSA formed public/private partnerships with industry and with Oak Ridge National Laboratory to demonstrate and display available ITS/CVO technologies in a cooperative effort. The mobile demonstration unit was showcased at national and regional conferences, symposiums, universities, truck shows and other venues, in an effort to reach as many potential users and decision makers as possible. By the end of the touring phase, the ITS/CVO Technology Truck had been demonstrated in 38 states, 4 Canadian provinces, 88 cities, and 114 events; been toured by 18,099 people; and traveled 115,233 miles. The market penetration for the Technology Truck exceeded 4,000,000, and the website received more than 25,000 hits. In addition to the Truck's visits, the portable ITS/CVO kiosk was demonstrated at 31 events in 23 cites in 15

  9. Final status of the salt repository project waste package program experimental database

    International Nuclear Information System (INIS)

    Thornton, B.M.; Reimus, P.W.

    1988-03-01

    This report describes the final status of the Salt Repository Project Waste Package Program Experimental Database. The data base serves as a clearinghouse for all data collected within the Waste Package Program (WPP) and its predecessor programs at Pacific Northwest Laboratory (PNL). The database was maintained using RS/1 database management software. Documented assurance that the entries in the database were consistent with experimental records was provided by having each experimentalist inspect the entries and signify that they were in agreement with the records. The inspection and signoff were done per PNL technical procedures. Data for which it was impossible to obtain the experimentalist's inspection and signature were segregated from the rest of the database, although they could still be accessed by WPP staff. The WPPED contains two groups of subdirectories. One group contains data taken prior to the installation of quality assurance procedures at PNL. The other group of subdirectories contains data taken under the NQA-1 procedures since their installation in April 1985. As part of closeout activities in the Salt Repository Project, the WPP database has been archived onto magnetic media. The data in the database are available by request on magnetic media or in hardcopy form. 2 refs

  10. Baseline wildlife monitoring at I-90 Snoqualmie Pass East, prior to the installation of wildlife crossing structures.

    Science.gov (United States)

    2012-12-01

    The I-90 Snoqualmie Pass East Project (SPE) is located along a 15-mile stretch of Interstate 90 : that passes through the Okanogan-Wenatchee National Forest. The project corridor has been : identified as a critical connectivity zone for Pacific North...

  11. A South-East Asian perspective.

    Science.gov (United States)

    Koh, D; Chia, S E; Jeyaratnam, J

    2000-01-01

    In order to discuss the subject of occupational medicine in the next century, changes in the present demographic profile and work activity must be considered first. Only then can the challenges be identified, and appropriate strategies be formulated to respond to them. In the diverse countries of South-East Asia, improved health and work conditions, the advent of new technology, a redistribution of work activity, and an ageing workforce can be expected. Two other factors that have specific impact in the region are the recent financial crisis and the occurrence of an international environmental haze from forest fires. The various countries in South-East Asia, which are in different stages of development, and have different problems and priorities, will respond differently to the demands for occupational health. It is likely that there will be a shift in the focus of current health care activities towards specific work sectors, the recognition of new hazards at work, the identification of newly emerging work related diseases, and an increase in health promotion in the workplace. Hopefully, there will be improved training of health professionals to ensure that there are adequate numbers and that they are well prepared to face these changes. Responsive, appropriate and well enforced labour legislation to protect the health of all workers, and international cooperation in occupational and environmental health are also required. As global and regional economic conditions continue to remain unstable and the impact of the crisis further takes its course, the final effect on occupational health in South-East Asia remains to be seen.

  12. Klickitat Cogeneration Project: Final environmental assessment

    International Nuclear Information System (INIS)

    1994-09-01

    To meet BPA's contractual obligation to supply electrical power to its customers, BPA proposes to acquire power generated by Klickitat Cogeneration Project. BPA has prepared an environmental assessment evaluating the proposed project. Based on the EA analysis, BPA's proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 for the following reasons: (1)it will not have a significant impact land use, upland vegetation, wetlands, water quality, geology, soils, public health and safety, visual quality, historical and cultural resources, recreation and socioeconomics, and (2) impacts to fisheries, wildlife resources, air quality, and noise will be temporary, minor, or sufficiently offset by mitigation. Therefore, the preparation of an environmental impact statement is not required and BPA is issuing this FONSI (Finding of No Significant Impact)

  13. Klickitat Cogeneration Project : Final Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Klickitat Energy Partners

    1994-09-01

    To meet BPA`s contractual obligation to supply electrical power to its customers, BPA proposes to acquire power generated by Klickitat Cogeneration Project. BPA has prepared an environmental assessment evaluating the proposed project. Based on the EA analysis, BPA`s proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 for the following reasons: (1)it will not have a significant impact land use, upland vegetation, wetlands, water quality, geology, soils, public health and safety, visual quality, historical and cultural resources, recreation and socioeconomics, and (2) impacts to fisheries, wildlife resources, air quality, and noise will be temporary, minor, or sufficiently offset by mitigation. Therefore, the preparation of an environmental impact statement is not required and BPA is issuing this FONSI (Finding of No Significant Impact).

  14. Use of Machine Learning Techniques for Iidentification of Robust Teleconnections to East African Rainfall Variability in Observations and Models

    Science.gov (United States)

    Roberts, J. Brent; Robertson, Franklin R.; Funk, Chris

    2014-01-01

    Providing advance warning of East African rainfall variations is a particular focus of several groups including those participating in the Famine Early Warming Systems Network. Both seasonal and long-term model projections of climate variability are being used to examine the societal impacts of hydrometeorological variability on seasonal to interannual and longer time scales. The NASA / USAID SERVIR project, which leverages satellite and modeling-based resources for environmental decision making in developing nations, is focusing on the evaluation of both seasonal and climate model projections to develop downscaled scenarios for using in impact modeling. The utility of these projections is reliant on the ability of current models to capture the embedded relationships between East African rainfall and evolving forcing within the coupled ocean-atmosphere-land climate system. Previous studies have posited relationships between variations in El Niño, the Walker circulation, Pacific decadal variability (PDV), and anthropogenic forcing. This study applies machine learning methods (e.g. clustering, probabilistic graphical model, nonlinear PCA) to observational datasets in an attempt to expose the importance of local and remote forcing mechanisms of East African rainfall variability. The ability of the NASA Goddard Earth Observing System (GEOS5) coupled model to capture the associated relationships will be evaluated using Coupled Model Intercomparison Project Phase 5 (CMIP5) simulations.

  15. Low-level radioactive waste management at Argonne National Laboratory-East

    International Nuclear Information System (INIS)

    Rock, C.M.; Shearer, T.L.; Nelson, R.A.

    1997-01-01

    This paper is an overview of the low-level radioactive waste management practices and treatment systems at Argonne National Laboratory - East (ANL-E). It addresses the systems, processes, types of waste treated, and the status and performance of the systems. ANL-E is a Department of Energy laboratory that is engaged in a variety of research projects, some of which generate radioactive waste, in addition a significant amount of radioactive waste remains from previous projects and decontamination and decommissioning of facilities where this work was performed

  16. Project Familia. Final Evaluation Report, 1993-94. OER Report.

    Science.gov (United States)

    New York City Board of Education, Brooklyn, NY. Office of Educational Research.

    Project Familia was an Elementary and Secondary Education Act Title VII project in its second year in 1993-94 in New York City. Project Familia served 77 children at 3 schools who were identified as limited English proficient, special education students in prekindergarten through fifth grade and their parents. The project provided after-school…

  17. Final Report for NMBSA Project, Monika Kaden, 2016

    Energy Technology Data Exchange (ETDEWEB)

    Ward, William Carl [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2016-12-13

    The following pages define the objectives and results for Project 022, requested by Monika Kaden, a sculptor who maintains studios in Santa Fe. This effort was first approved in February 2016, and was completed during several different time segments spread over the year, depending on Monika’s availability. The project deliverables that are of primary use to the customer are digital data files that are to be delivered electronically. This report is a summary overview of how the project was conducted.

  18. Proposed waste isolation pilot project (WIPP) and impacts in the state of New Mexico: a socio-economic analysis. Final report

    International Nuclear Information System (INIS)

    Cummings, R.D.; Burness, H.S.; Norton, R.D.

    1981-04-01

    This document is a final report for research conducted concerning the socio-economic impacts in the State of New Mexico that might attend the construction and operation of the proposed Waste Isolation Pilot Plant (WIPP). The proposed site for the WIPP, known as the Los Medanos site, is in Southeastern New Mexico's Eddy County, some 25 miles east of Carlsbad, New Mexico and some 40 miles from Hobbs, New Mexico, in adjacent Lea County. The purpose as set out in the US Department of Energy's environmental impact statements is for storage of TRU waste from the US defense program and the construction of a research and development area for experiments concerning the isolation of all types of nuclear waste in salt. The intended purpose of the study is to identify, measure (when possible) and assess the range of potential socio-economic impacts in the State that may be attributable to the WIPP. Every effort has been made by the authors to approach this task in an objective manner. In efforts to provide an objective analysis of the WIPP, however, particular attention was required in providing a comprehensive review of potential impacts. This means that however unlikely an impact might seem, the authors have purposely avoided pre-judging the potential magnitude of the impact and have applied their best efforts to measure it. On the other hnd, this study is not intended to provide a definitive calculation regarding the net balance of WIPP-related benefits and costs. To help ensure objectivity, two advisory boards, Technical Advisory Board and Public Advisory Board, were formed at the outset of the project for the purpose of providing periodic reviews of research efforts

  19. Natural gas development in the Russian Far East

    International Nuclear Information System (INIS)

    Khartukov, E.M.

    1994-01-01

    The poorly explored and mostly underdeveloped gas resources of the Russian Far East (RFE) are large enough to support several large-scale projects, with an aggregate exportable surplus of up to 30 bcm of natural gas a year. However, owing to the uncertainties of the regional and national investment climate, new development projects, which heavily rely upon invited foreign participation, are likely to be delayed and will hardly yield, by the year 2000, more than 10 bcm of Russian gas for export. Nevertheless, in the forecastable future the region will emerge as an important player in the Asia-Pacific energy market and, consequently, in this area's geopolitical arena as well. (author)

  20. Wetis – a Web based tourist information system for East Slovakia

    Directory of Open Access Journals (Sweden)

    Jana Jablonská

    2009-12-01

    Full Text Available Services like tourism have to use the possibilities of modern advertising and data presentation. In particular, these includethe World Wide Web (WWW. This platform brings its products and services directly to the customers. To place the information abouta region and its tourist offer in optimal manner, requires an exact definition of elements in the planned tourist info systems and theirpresentation. WETIS is the acronym of the “Web based tourist information system”.The WETIS elements and their integration into other services, the data structures and types, maps and their interactivityare considered. Furthermore, the paper presents tourism related data of selected Slovakian villages and cities. Finally, a reportregarding the demonstration web page and its future development is given.Usually, the tourist information systems on the web relate to the most interesting historical or cultural sights in the region. In thisway, the beauty of the many towns and villages is not appreciable and thus tend to be left out of tourist programmes. In order to fillthe gap, a project was initiated at the Institute of Geotourism, where students cooperated in mapping the actual situation in the fieldand gradually covering all the villages and cities of the region of East Slovakia.The project is still an ongoing project and the data upload is still incomplete. The WETIS contains useful information on a givenlocality. The detailed photo-documentation makes it possible to see each building of interest at a given locality. In order to avoidexcessive data load for the WETIS users, the detailed data interesting only for professionals are available only on demand.

  1. a Heritage Inventory for Documenting Endangered Archaeology in the Middle East and North Africa

    Science.gov (United States)

    Sheldrick, N.; Zerbini, A.

    2017-08-01

    The heritage of the Middle East and North Africa is under growing threat from a variety of factors, including agricultural expansion, urban development, looting, and conflict. Recording and documenting this heritage is therefore a key priority to aid heritage practitioners tasked with protecting sites and evaluating their condition on the ground. The Endangered Archaeology in the Middle East and North Africa (EAMENA) project has developed a methodology for the identification, documentation, analysis, and monitoring of sites across the region to aid heritage professionals in these efforts. The project uses remote sensing techniques along with traditional archaeological research and prospection methods to collect data, which are stored and managed in a custom-designed database adapted from open-source Arches v.3 software, using CIDOC CRM standards and controlled vocabularies. In addition to these activities, the EAMENA project has initiated an international conference series and training workshops to support and establish partnerships with heritage professionals and institutions across the region.

  2. A HERITAGE INVENTORY FOR DOCUMENTING ENDANGERED ARCHAEOLOGY IN THE MIDDLE EAST AND NORTH AFRICA

    Directory of Open Access Journals (Sweden)

    N. Sheldrick

    2017-08-01

    Full Text Available The heritage of the Middle East and North Africa is under growing threat from a variety of factors, including agricultural expansion, urban development, looting, and conflict. Recording and documenting this heritage is therefore a key priority to aid heritage practitioners tasked with protecting sites and evaluating their condition on the ground. The Endangered Archaeology in the Middle East and North Africa (EAMENA project has developed a methodology for the identification, documentation, analysis, and monitoring of sites across the region to aid heritage professionals in these efforts. The project uses remote sensing techniques along with traditional archaeological research and prospection methods to collect data, which are stored and managed in a custom-designed database adapted from open-source Arches v.3 software, using CIDOC CRM standards and controlled vocabularies. In addition to these activities, the EAMENA project has initiated an international conference series and training workshops to support and establish partnerships with heritage professionals and institutions across the region.

  3. Sea level rise drives increased tidal flooding frequency at tide gauges along the U.S. East and Gulf Coasts: Projections for 2030 and 2045.

    Science.gov (United States)

    Dahl, Kristina A; Fitzpatrick, Melanie F; Spanger-Siegfried, Erika

    2017-01-01

    Tidal flooding is among the most tangible present-day effects of global sea level rise. Here, we utilize a set of NOAA tide gauges along the U.S. East and Gulf Coasts to evaluate the potential impact of future sea level rise on the frequency and severity of tidal flooding. Using the 2001-2015 time period as a baseline, we first determine how often tidal flooding currently occurs. Using localized sea level rise projections based on the Intermediate-Low, Intermediate-High, and Highest projections from the U.S. National Climate Assessment, we then determine the frequency and extent of such flooding at these locations for two near-term time horizons: 2030 and 2045. We show that increases in tidal flooding will be substantial and nearly universal at the 52 locations included in our analysis. Long before areas are permanently inundated, the steady creep of sea level rise will force many communities to grapple with chronic high tide flooding in the next 15 to 30 years.

  4. WindFloat Pacific Project, Final Scientific and Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Banister, Kevin [Principle Power, Inc., Emeryville, CA (United States)

    2017-01-17

    PPI’s WindFloat Pacific project (WFP) was an up to 30 MW floating offshore wind demonstration project proposed off the Coast of Oregon. The project was to be sited approximately 18 miles due west of Coos Bay, in over 1000 ft. of water, and is the first floating offshore wind array proposed in the United States, and the first offshore wind project of any kind proposed off the West Coast. PPI’s WindFloat, a semi-submersible foundation designed for high-capacity (6MW+) offshore wind turbines, is at the heart of the proposed project, and enables access to the world class wind resource at the project site and, equally, to other deep water, high wind resource areas around the country.

  5. SUNSTORE 3. Phase 1. Project design and tender. Final report; SUNSTORE 3. Fase 1. Projektering og udbud. Slutrapport

    Energy Technology Data Exchange (ETDEWEB)

    Soerensen, P.A. (PlanEnergi, Skoerping (Denmark)); Moeller Nielsen, C. (Dronninglund Fjernvarme, Dronninglund (Denmark)); Baunwall, M. (NIRAS Aalborg (Denmark)); Munkholt, H. (GG-Construction, Aalborg (Denmark)); Paaske, B. (Teknologisk Institut, AArhus (Denmark)); Schmidt, T. (SOLITES, Stuttgart (Germany))

    2011-03-15

    The objective of the project has been to carry out detailed design and tendering for a heat production plant consisting of: - 35.000 m{sub 2} solar thermal collectors, - 60.000 m{sub 3} pit heat storage, - 3 MW{sub heat} heat pump, covering app. 50% of the heat production at Dronninglund district heating plant (Denmark). The final report for the project includes detailed design of the pit heat storage (a further development of a 10.000 m{sub 3} storage implemented in Marstal) and simulation of the total production system in the simulation software TRNSYS. (ln)

  6. District heating rehabilitation project. Viljandi - Estonia. Final report

    International Nuclear Information System (INIS)

    1998-04-01

    The main objective of the project has been to assist Viljandi Municipality with the rehabilitation of their district heating system, and thereby to support the positive development of the district heating system in Viljandi to a more energy efficient and rational system and to achieve a significantly decrease in the pollution from the production of heat energy in Viljandi. The project has also included technical assistance to Viljandi DH company, in order to make them capable of operation and maintaining of the new substations, and also training of the local operational staff for operation of the complete district heating system. Viljandi is a county and is centrally located in Estonia, which makes Viljandi very suitable as recipient for a demonstration project. One important objective was the projects significantly positive environmental impact in reduction of the generated emissions of CO 2 , NO x and SO 2 , as the project includes installation of more efficient energy systems and supply of heat from the 2 existing district heating plants (both are partly fired with wood chips) instead of heating by very old and worn-out coal fired boilers and inexpedient designed substations with the present operational conditions. (EG)

  7. District heating rehabilitation project. Viljandi - Estonia. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-04-01

    The main objective of the project has been to assist Viljandi Municipality with the rehabilitation of their district heating system, and thereby to support the positive development of the district heating system in Viljandi to a more energy efficient and rational system and to achieve a significantly decrease in the pollution from the production of heat energy in Viljandi. The project has also included technical assistance to Viljandi DH company, in order to make them capable of operation and maintaining of the new substations, and also training of the local operational staff for operation of the complete district heating system. Viljandi is a county and is centrally located in Estonia, which makes Viljandi very suitable as recipient for a demonstration project. One important objective was the projects significantly positive environmental impact in reduction of the generated emissions of CO{sub 2}, NO{sub x} and SO{sub 2}, as the project includes installation of more efficient energy systems and supply of heat from the 2 existing district heating plants (both are partly fired with wood chips) instead of heating by very old and worn-out coal fired boilers and inexpedient designed substations with the present operational conditions. (EG)

  8. Final report of the decontamination and decommission of Building 31 at the Grand Junction Projects Office Facility

    International Nuclear Information System (INIS)

    Krabacher, J.E.

    1996-07-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the domestic uranium procurement program funded by the U.S. Atomic Energy Commission. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also was the remedial action contractor. Radiological contamination was identified in Building 31 and the building was demolished in 1992. The soil area within the footprint of the building has been remediated in accordance with the identified standards and the area can be released for unlimited exposure and unrestricted use. This area was addressed in the summary final report of the remediation of the exterior areas of the GJPO facility. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building

  9. Skate Genome Project: Cyber-Enabled Bioinformatics Collaboration

    Science.gov (United States)

    Vincent, J.

    2011-01-01

    The Skate Genome Project, a pilot project of the North East Cyber infrastructure Consortium, aims to produce a draft genome sequence of Leucoraja erinacea, the Little Skate. The pilot project was designed to also develop expertise in large scale collaborations across the NECC region. An overview of the bioinformatics and infrastructure challenges faced during the first year of the project will be presented. Results to date and lessons learned from the perspective of a bioinformatics core will be highlighted.

  10. The Dust Management Project: Final Report

    Science.gov (United States)

    Hyatt, Mark J.; Straka, Sharon

    2011-01-01

    A return to the Moon to extend human presence, pursue scientific activities, use the Moon to prepare for future human missions to Mars, and expand Earth s economic sphere, will require investment in developing new technologies and capabilities to achieve affordable and sustainable human exploration. From the operational experience gained and lessons learned during the Apollo missions, conducting longterm operations in the lunar environment will be a particular challenge, given the difficulties presented by the unique physical properties and other characteristics of lunar regolith, including dust. The Apollo missions and other lunar explorations have identified significant lunar dust-related problems that will challenge future mission success. Comprised of regolith particles ranging in size from tens of nanometers to microns, lunar dust is a manifestation of the complex interaction of the lunar soil with multiple mechanical, electrical, and gravitational effects. The environmental and anthropogenic factors effecting the perturbation, transport, and deposition of lunar dust must be studied in order to mitigate it s potentially harmful effects on exploration systems and human explorers. The Dust Management Project (DMP) is tasked with the evaluation of lunar dust effects, assessment of the resulting risks, and development of mitigation and management strategies and technologies related to Exploration Systems architectures. To this end, the DMP supports the overall goal of the Exploration Technology Development Program (ETDP) of addressing the relevant high priority technology needs of multiple elements within the Constellation Program (CxP) and sister ETDP projects. Project scope, approach, accomplishments, summary of deliverables, and lessons learned are presented.

  11. Development of a criticality alarm system neutron detector: Final project report

    International Nuclear Information System (INIS)

    O'Dell, A.A.

    1989-05-01

    The primary objective of this project was to develop a prototype neutron detector for use in criticality alarm systems (CASs) at US Department of Energy (DOE) and contractor facilities wherever significant amounts of fissile material are processed or stored. Constraints placed on the design of the detector were that the overall size of the detector was to be as small as practical, the input voltage requirements were to be no more than 24 V, and that the gamma sensitivity would be as low as possible. Also, the detector should give dosimetric neutron response, and should have sufficient temporal capabilities to measure the entire range from fast (>1 ms) to slow (seconds to minutes) excursions, and sufficient dynamic range to measure from background to over 100 times background levels to insure proper activation of the Immediate Evacuation Alarm (IEA). Finally, the detector should insure rapid (<1 s) activation of the IEA in the event of a criticality excursion. 24 figs., 11 tabs

  12. Final technical report; Mercury Release from Organic matter (OM) and OM-Coated Mineral Surfaces

    Energy Technology Data Exchange (ETDEWEB)

    Aiken, George

    2014-10-02

    This document is the final technical report for a project designed to address fundamental processes controlling the release of mercury from flood plain soils associated with East Fork Poplar Creek, Tennessee near the U.S. Department of Energy Oak Ridge facility. The report summarizes the activities, findings, presentations, and publications resulting from an award to the U.S. Geological that were part of a larger overall effort including Kathy Nagy (University of Illinois, Chicago, Ill) and Joseph Ryan (University of Colorado, Boulder, CO). The specific charge for the U.S.G.S. portion of the study was to provide analytical support for the larger group effort (Nagy and Ryan), especially with regard to analyses of Hg and dissolved organic matter, and to provide information about the release of mercury from the floodplain soils.

  13. Final report Hanford environmental compliance project 89-D-172

    International Nuclear Information System (INIS)

    Kelly, J.R.

    1996-01-01

    The Hanford Environmental Compliance (HEC) Project is unique in that it consisted of 14 subprojects which varied in project scope and were funded from more that one program. This report describes the HEC Project from inception to completion and the scope, schedule, and cost of the individual subprojects. Also provided are the individual subproject Cost closing statements and Project completion reports accompanied by construction photographs and illustrations

  14. Friedrich Max Müller and the Sacred Books of the East

    NARCIS (Netherlands)

    Molendijk, Arie L.

    2016-01-01

    This volume offers a critical analysis of one the most ambitious editorial projects of late Victorian Britain: the edition of the fifty substantial volumes of the Sacred Books of the East (1879-1910). The series was edited and conceptualized by Friedrich Max Müller (1823-1900), a world-famous

  15. Conservation as a Core Asset for Livelihood Security in East Africa ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    This project aims to help rural households and decision-makers better understand conservation and biodiversity as key components of rural livelihood improvement strategies and security in East Africa and the Horn of Africa. It will do so by documenting lessons learned by rural communities on the linkages between ...

  16. Correlation and anti-correlation of the East Asian summer and winter monsoons during the last 21,000 years.

    Science.gov (United States)

    Wen, Xinyu; Liu, Zhengyu; Wang, Shaowu; Cheng, Jun; Zhu, Jiang

    2016-06-22

    Understanding the past significant changes of the East Asia Summer Monsoon (EASM) and Winter Monsoon (EAWM) is critical for improving the projections of future climate over East Asia. One key issue that has remained outstanding from the paleo-climatic records is whether the evolution of the EASM and EAWM are correlated. Here, using a set of long-term transient simulations of the climate evolution of the last 21,000 years, we show that the EASM and EAWM are positively correlated on the orbital timescale in response to the precessional forcing, but are anti-correlated on millennial timescales in response to North Atlantic melt water forcing. The relation between EASM and EAWM can differ dramatically for different timescales because of the different response mechanisms, highlighting the complex dynamics of the East Asian monsoon system and the challenges for future projection.

  17. Final rapid reactivation project environmental assessment

    International Nuclear Information System (INIS)

    1999-01-01

    The US Department of Energy (DOE) has prepared an environmental assessment (EA) for the Rapid Reactivation Project at Sandia National Laboratories, New Mexico. The EA analyzes the potential effects of a proposal to increase production of neutron generators from the current capability of 600 units per year up to 2,000 units per year. The project would use existing buildings and infrastructure to the maximum extent possible to meet the additional production needs. The increased production levels would necessitate modifications and additions involving a total area of approximately 26,290 gross square feet at Sandia National Laboratories, New Mexico, Technical Area 1. Additional production equipment would be procured and installed. The no-action alternative would be to continue production activities at the current capability of 600 units per year. The EA analyzes effects on health, safety, and air quality, resulting from construction and operation and associated cumulative effects. A detailed description of the proposed action and its environmental consequences is presented in the EA

  18. India’s Look/Act East Policy and the Northeast Region: A Critical Perspective

    Directory of Open Access Journals (Sweden)

    Professor Hiranya K Nath

    2017-11-01

    Full Text Available India’s Look East Policy (LEP signifies a strategic shift in its international political, economic, and military relationships. Regional integration of its Northeast Region (NER with the countries in East, Southeast and South Asia may potentially generate economic dividends to the region. However, there are formidable challenges in realizing the potentials. The proposed infrastructure projects, if completed with no further delay, will go a long way in improving connectivity with the neighbouring countries. However, improving connectivity within the region and with the rest of the country is also very important. Further, it would require a comprehensive long-term plan with well-defined projects for developing industries and services including education, health and tourism. Building infrastructure, ensuring socio-political stability and ecological balance, and improving the quality of institutions would be a major part of this plan.

  19. Anacostia River fringe wetlands restoration project: final report for the five-year monitoring program (2003 through 2007)

    Science.gov (United States)

    Krafft, Cairn C.; Hammerschlag, Richard S.; Guntenspergen, Glenn R.

    2009-01-01

    The 6-hectare (ha) freshwater tidal Anacostia River Fringe Wetlands (Fringe Wetlands) were reconstructed along the mainstem of the Anacostia River in Washington, DC (Photograph 1, Figure 1) during the summer of 2003. The Fringe Wetlands consist of two separate planting cells. Fringe A, located adjacent to Lower Kingman Island, on the west bank of the Anacostia River, occupies 1.6 ha; Fringe B, located on the east bank of the Anacostia River, occupies 4.4 ha. This project is the third in a series of freshwater tidal wetland reconstructions on the Anacostia River designed and implemented by the US Army Corps of Engineers (USACE) Baltimore District and District Department of the Environment (DDOE) on lands managed by the National Park Service (NPS). The first was Kenilworth Marsh, reconstructed in 1993 (Syphax and Hammerschlag 2005); the second was Kingman Marsh, reconstructed in 2000 (Hammerschlag et al. 2006). Kenilworth and Kingman were both constructed in low-energy backwaters of the Anacostia. However, the Fringe Wetlands, which were constructed on two pre-existing benches along the high-energy mainstem, required sheet piling to provide protection from erosive impacts of increased flow and volume of water associated with storm events during the establishment phase (Photograph 2). All three projects required the placement of dredged sediment materials to increase elevations enough to support emergent vegetation (Photograph 3). The purpose of all three wetland reconstruction projects was to restore pieces of the once extensive tidal freshwater marsh habitat that bordered the Anacostia River historically, prior to the dredge and fill operations and sea wall installation that took place there in the early to mid-1900's (Photograph 4).

  20. The Origins of the Acheulean at Olduvai Gorge (Tanzania: A New Paleoanthropological Project in East Africa

    Directory of Open Access Journals (Sweden)

    Ignacio de la Torre

    2012-12-01

    Full Text Available The disappearance of the earliest human culture, the Oldowan, and its substitution by a new technology, the Acheulean, is one of the main topics in modern Paleoanthropology. Recent research has established that the Acheulean emerged originally in East Africa around 1.7–1.6 million years ago, and from that area expanded across the rest of Africa, Europe and parts of Asia. Despite the great relevance of the Oldowan-Acheulean transition, little is known about the biological and cultural evolutionary mechanisms underlying this process. Traditionally, it has been assumed that this major cultural change was ignited by the emergence of a new human species, Homo ergaster/erectus, and that there was a steady technological evolution during the Oldowan that eventually led to the emergence of the Acheulean handaxes. However, these assumptions are not grounded in the current available evidence, but rooted in cultural-history paradigms that should now be superseded. Olduvai Gorge (Tanzania is the site where the traditional view of the Oldowan-Acheulean transition was established. The aim of the recently launched Olduvai Geochronology and Archaeology Project is to tackle this question by conducting a comprehensive research program at Olduvai, based on the retrieval of fresh data derived from new laboratory and fieldwork research. The multidisciplinary character of this ongoing study is providing an integrative perspective to the analysis of the paleoecology, archaeology, geology and geochronology of the transition to the Acheulean at Olduvai. Using an innovative theoretical perspective that combines interests in cultural change, ecological adaptations, and biological evolution, and state-of-the-art methods in archaeology, geology and taphonomy, this project aims to make Olduvai one of the world’s best references for the understanding of the evolutionary processes that led to the emergence of the Acheulean, the longest lasting culture in the history of

  1. All projects related to | Page 52 | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Skills for Employment: Scaling Up Technical and Vocational Training. Project. This project will help prepare youth in East and Southern Africa for economic opportunities, and improve the skills of new labour market entrants and existing workers. Topic: TRAINING, EMPLOYMENT, YOUTH, YOUTH UNEMPLOYMENT, EAST ...

  2. Brief communication: Drought likelihood for East Africa

    Directory of Open Access Journals (Sweden)

    H. Yang

    2018-02-01

    Full Text Available The East Africa drought in autumn of year 2016 caused malnutrition, illness and death. Close to 16 million people across Somalia, Ethiopia and Kenya needed food, water and medical assistance. Many factors influence drought stress and response. However, inevitably the following question is asked: are elevated greenhouse gas concentrations altering extreme rainfall deficit frequency? We investigate this with general circulation models (GCMs. After GCM bias correction to match the climatological mean of the CHIRPS data-based rainfall product, climate models project small decreases in probability of drought with the same (or worse severity as 2016 ASO (August to October East African event. This is by the end of the 21st century compared to the probabilities for present day. However, when further adjusting the climatological variability of GCMs to also match CHIRPS data, by additionally bias-correcting for variance, then the probability of drought occurrence will increase slightly over the same period.

  3. Brief communication: Drought likelihood for East Africa

    Science.gov (United States)

    Yang, Hui; Huntingford, Chris

    2018-02-01

    The East Africa drought in autumn of year 2016 caused malnutrition, illness and death. Close to 16 million people across Somalia, Ethiopia and Kenya needed food, water and medical assistance. Many factors influence drought stress and response. However, inevitably the following question is asked: are elevated greenhouse gas concentrations altering extreme rainfall deficit frequency? We investigate this with general circulation models (GCMs). After GCM bias correction to match the climatological mean of the CHIRPS data-based rainfall product, climate models project small decreases in probability of drought with the same (or worse) severity as 2016 ASO (August to October) East African event. This is by the end of the 21st century compared to the probabilities for present day. However, when further adjusting the climatological variability of GCMs to also match CHIRPS data, by additionally bias-correcting for variance, then the probability of drought occurrence will increase slightly over the same period.

  4. Legacy sample disposition project. Volume 2: Final report

    International Nuclear Information System (INIS)

    Gurley, R.N.; Shifty, K.L.

    1998-02-01

    This report describes the legacy sample disposition project at the Idaho Engineering and Environmental Laboratory (INEEL), which assessed Site-wide facilities/areas to locate legacy samples and owner organizations and then characterized and dispositioned these samples. This project resulted from an Idaho Department of Environmental Quality inspection of selected areas of the INEEL in January 1996, which identified some samples at the Test Reactor Area and Idaho Chemical Processing Plant that had not been characterized and dispositioned according to Resource Conservation and Recovery Act (RCRA) requirements. The objective of the project was to manage legacy samples in accordance with all applicable environmental and safety requirements. A systems engineering approach was used throughout the project, which included collecting the legacy sample information and developing a system for amending and retrieving the information. All legacy samples were dispositioned by the end of 1997. Closure of the legacy sample issue was achieved through these actions

  5. US Department of Energy Grand Junction Projects Office Remedial Action Project, final report of the decontamination and decommissioning of Building 36 at the Grand Junction Projects Office Facility

    International Nuclear Information System (INIS)

    Widdop, M.R.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission's domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also is the remedial action contractor. Building 36 was found to be radiologically contaminated and was demolished in 1996. The soil beneath the building was remediated in accordance with identified standards and can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building

  6. US Department of Energy Grand Junction Projects Office Remedial Action Project. Final report of the decontamination and decommissioning of Building 52 at the Grand Junction Projects Office Facility

    International Nuclear Information System (INIS)

    Krabacher, J.E.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission's domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also was the remedial action contractor. Building 52 was found to be radiologically contaminated and was demolished in 1994. The soil area within the footprint of the building has been remediated in accordance with the identified standards and the area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building

  7. Abrupt recent trend changes in atmospheric nitrogen dioxide over the Middle East

    KAUST Repository

    Lelieveld, J.

    2015-08-21

    Nitrogen oxides, released from fossil fuel use and other combustion processes, affect air quality and climate. From the mid-1990s onward, nitrogen dioxide (NO2) has been monitored from space, and since 2004 with relatively high spatial resolution by the Ozone Monitoring Instrument. Strong upward NO2 trends have been observed over South and East Asia and the Middle East, in particular over major cities. We show, however, that a combination of air quality control and political factors, including economical crisis and armed conflict, has drastically altered the emission landscape of nitrogen oxides in the Middle East. Large changes, including trend reversals, have occurred since about 2010 that could not have been predicted and therefore are at odds with emission scenarios used in projections of air pollution and climate change in the early 21st century.

  8. Maine Project against Bullying. Final Report.

    Science.gov (United States)

    Saufler, Chuck; Gagne, Cyndi

    Noting that bullying among primary school-age children has become recognized as an antecedent to more violent behavior in later grades, the 3-year Maine Project Against Bullying examined currently available research on bullying and evaluated books, curricula, media materials, and programs to identify resources and strategies which can be applied…

  9. Alpena Community College Workplace Partnership Project. Final Report.

    Science.gov (United States)

    Alpena Community Coll., MI.

    This document consists of materials produced during the Workplace Partnership Project (WPP), a National Workplace Literacy Program-funded workplace literacy partnership between Alpena Community College (ACC) in Alpena, Michigan, and area businesses. Presented first is a personal reflection in which the project director shares some of the lessons…

  10. Preliminary assessment of habitat protection needs for West Indian manatees on the east coast of Florida and Georgia. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1988-12-01

    The report assesses information on the status of endangered West Indian manatees (Trichechus manatus) on the east coast of Florida and Georgia in the southeastern United States and recommends actions to improve protection of the species and its habitat in that area. Manatees on the east coast of Florida and Georgia appear to constitute a discrete population numbering perhaps 700 to 900 animals. Based on carcass-salvage data, recent annual mortality rates of between 8% and 10% are indicated. Perhaps 3% to 4% of the population was killed as a result of collisions with boats during 1987, and this threat appears to be increasing. Collisions with boats and destruction of essential habitat are the principal threats to the population. Recommendations include: quadruple the size of the boat-speed regulatory system on the east coast of Florida; limit development in essential manatee habitats; acquire additional manatee habitat as additions to Federal and State refuges and preserves.

  11. Spray casting project final report

    International Nuclear Information System (INIS)

    Churnetski, S.R.; Thompson, J.E.

    1996-08-01

    Lockheed Martin Energy Systems, Inc. (Energy Systems), along with other participating organizations, has been exploring the feasibility of spray casting depleted uranium (DU) to near-net shape as a waste minimization effort. Although this technology would be useful in a variety of applications where DU was the material of choice, this effort was aimed primarily at gamma-shielding components for use in storage and transportation canisters for high-level radioactive waste, particularly in the Multipurpose Canister (MPC) application. In addition to the waste-minimization benefits, spray casting would simplify the manufacturing process by allowing the shielding components for MPC to be produced as a single component, as opposed to multiple components with many fabrication and assembly steps. In earlier experiments, surrogate materials were used to simulate the properties (specifically reactivity and density) of DU. Based on the positive results from those studies, the project participants decided that further evaluation of the issues and concerns that would accompany spraying DU was warranted. That evaluation occupied substantially all of Fiscal Year 1995, yielding conceptual designs for both an intermediate facility and a production facility and their associated engineering estimates. An intermediate facility was included in this study to allow further technology development in spraying DU. Although spraying DU to near-net shape seems to be feasible, a number of technical, engineering, and safety issues would need to be evaluated before proceeding with a production facility. This report is intended to document the results from the spray-casting project and to provide information needed by anyone interested in proceeding to the next step

  12. Status report on the Experimental Boiling Water Reactor (EBWR) Decontamination and Decommissioning (D ampersand D) Project

    International Nuclear Information System (INIS)

    Sears, L.; Garlock, G.; Mencarelli, R.; Fellhauer, C.

    1994-01-01

    ALARON Corporation is under contract, to Argonne National Laboratory - East (ANL-E), to complete the decontamination and decommissioning of the Experimental Boiling Water Reactor (EBWR). The project, begun, in 1986 by ANL-E personnel, is projected to be completed by the end of 1994. The final phase of work was awarded to ALARON in December 1993 with the scope of work including the disassembly and removal of all remaining reactor internals, the reactor vessel, the lead bio-shield, the core liner, and the activated portion of the concrete bio-shield. This paper discusses the work undertaken beginning in January 1994 and continuing through July 1994. During this period the required pre-mobilization documentation was prepared and approved, mobilization was completed, and the reactor internals, reactor vessel, lead bio-shield and core liner were removed. The paper will compare the planned schedule to the actual schedule, discuss problems encountered, review volume reduction techniques and health and safety issues including radiological aspects of the project

  13. The New District of East Belitung: the Review Poliferation Process

    Directory of Open Access Journals (Sweden)

    Hendri Yani

    2013-02-01

    Full Text Available The regional autonomy conducted in many functions of government. One of its forms is proliferation of region. The aim of this study was to overview the proceed of proliferation in East Belitung District. This research was a qualitative research consisted of two main techniques to collect the data; they were interview and secondary data from documentations. The findings show that there were ten steps to create the new East Belitung District. The steps started from the preparations of local’s planning and administration to the final steps in the hand of national parliaments. This study found that the number of local government in Indonesia has increases, and the process at the central government level seem relatively easy. But, the eligibility criteria being compromised. Then, the political will from communities were not clear mention. Also there was a conflict interest between local government and central government in the feasibility study for proliferation in Belitung District. It concluded that we could not deny that political intervention in the bureaucracy has facilitated the formation of East Belitung districts.

  14. Research Applications for Teaching (RAFT) Project. Final Report.

    Science.gov (United States)

    Thomson, James R., Jr.; Handley, Herbert M.

    A report is given of the development and progress of the Research Applications for Teaching (RAFT) project, developed at Mississippi State University. Based upon research findings relative to effective teaching and effective schooling, five curriculum modules were prepared and implemented in instruction. In the second year of the project the…

  15. East-West cooperation at CERN

    CERN Document Server

    2002-01-01

    From left to right: H. Bokemeyer, in charge of physics for INTAS, J. Sinnaeve, INTAS' general secretary and R. Landua, ATHENA spokesman, visit the ATHENA experiment installations. Heads of INTAS (International Association for the promotion and cooperation of the new independent states of the former Soviet Union) visited CERN on 11 October. This association is in charge of preserving and promoting the scientific potential of the former Soviet Union countries through a cooperation between East and West. In recents years, a certain number of projects related to the LHC experiments have been co-financed by INTAS. The support for young researchers coming from these countries is also a big success.

  16. Missouri Soybean Association Biodiesel Demonstration Project: Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Ludwig, Dale [Missouri Soybean Association, Jefferson City, MO (United States); Hamilton, Jill [Sustainable Energy Strategies, Inc., Fairfax, VA (United States)

    2011-10-27

    The Missouri Soybean Association (MSA) and the National Biodiesel Board (NBB) partnered together to implement the MSA Biodiesel Demonstration project under a United States Department of Energy (DOE) grant. The goal of this project was to provide decision makers and fleet managers with information that could lead to the increased use of domestically produced renewable fuels and could reduce the harmful impacts of school bus diesel exhaust on children. This project was initiated in September 2004 and completed in April 2011. The project carried out a broad range of activities organized under four areas: 1. Petroleum and related industry education program for fuel suppliers; 2. Fleet evaluation program using B20 with a Missouri school district; 3. Outreach and awareness campaign for school district fleet managers; and 4. Support of ongoing B20 Fleet Evaluation Team (FET) data collection efforts with existing school districts. Technical support to the biodiesel industry was also provided through NBB’s Troubleshooting Hotline. The hotline program was established in 2008 to troubleshoot fuel quality issues and help facilitate smooth implementation of the RFS and is described in greater detail under Milestone A.1 - Promote Instruction and Guidance on Best Practices. As a result of this project’s efforts, MSA and NBB were able to successfully reach out to and support a broad spectrum of biodiesel users in Missouri and New England. The MSA Biodiesel Demonstration was funded through a FY2004 Renewable Energy Resources Congressional earmark. The initial focus of this project was to test and evaluate biodiesel blends coupled with diesel oxidation catalysts as an emissions reduction technology for school bus fleets in the United States. The project was designed to verify emissions reductions using Environmental Protection Agency (EPA) protocols, then document – with school bus fleet experience – the viability of utilizing B20 blends. The fleet experience was expected to

  17. Environmentally-assisted cracking in austenitic light water reactor structural materials. Final report of the KORA-I project

    Energy Technology Data Exchange (ETDEWEB)

    Seifert, H.-P.; Ritter, S

    2009-03-15

    The following document is the final report of the KORA-I project, which was performed at the Paul Scherrer Institute (PSI) between 2006 and 2008 and was funded by the Swiss Nuclear Safety Inspectorate (ENSI). The three sub-projects of KORA-I covered the experimental characterisation of the effect of the reactor coolant environment on fatigue initiation and crack growth in austenitic stainless steels under boiling and pressurised water reactor conditions, the experimental evaluation of the potential and limits of the electrochemical noise measurement technique for the early detection of stress corrosion cracking initiation in austenitic stainless steels under boiling water reactor/normal water chemistry conditions, as well as the characterisation of the stress corrosion crack growth behaviour in the fusion line region of an Alloy 182-low-alloy reactor pressure vessel steel dissimilar metal weld. The main scientific results and major conclusions of the three sub-projects are discussed in three independent parts of this report. (author)

  18. Environmentally-assisted cracking in austenitic light water reactor structural materials. Final report of the KORA-I project

    International Nuclear Information System (INIS)

    Seifert, H.-P.; Ritter, S.

    2009-03-01

    The following document is the final report of the KORA-I project, which was performed at the Paul Scherrer Institute (PSI) between 2006 and 2008 and was funded by the Swiss Nuclear Safety Inspectorate (ENSI). The three sub-projects of KORA-I covered the experimental characterisation of the effect of the reactor coolant environment on fatigue initiation and crack growth in austenitic stainless steels under boiling and pressurised water reactor conditions, the experimental evaluation of the potential and limits of the electrochemical noise measurement technique for the early detection of stress corrosion cracking initiation in austenitic stainless steels under boiling water reactor/normal water chemistry conditions, as well as the characterisation of the stress corrosion crack growth behaviour in the fusion line region of an Alloy 182-low-alloy reactor pressure vessel steel dissimilar metal weld. The main scientific results and major conclusions of the three sub-projects are discussed in three independent parts of this report. (author)

  19. Development of TRU transmuters for optimization of the global fuel cycle. Final Report for the NERI Project

    International Nuclear Information System (INIS)

    Lee, John C.

    2009-01-01

    This final report summarizes the research activities during the entire performance period of the NERI grant, including the extra 9 months granted under a no-cost time extension. Building up on the 14 quarterly reports submitted through October 2008, we present here an overview of the research accomplishments under the five tasks originally proposed in July 2004, together with citations for publications resulting from the project. The AFCI-NERI project provided excellent support for two undergraduate and 10 graduates students at the University of Michigan during a period of three years and nine months. Significant developments were achieved in three areas: (1) Efficient deterministic fuel cycle optimization algorithms both for PWR and SFR configurations, (2) Efficient search algorithm for PWR equilibrium cycles, and (3) Simplified Excel-based script for dynamic fuel cycle analysis of diverse cycles. The project resulted in a total of 8 conference papers and three journal papers, including two that will be submitted shortly. Three pending publications are attached to the report

  20. Final report of the decontamination and decommissioning of Building 44 at the Grand Junction Projects Office Facility

    International Nuclear Information System (INIS)

    Widdop, M.R.

    1996-07-01

    The U.S. Department of Energy (DOE) Junction Projects Office (GJPO) occupies a 61.7 acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission's domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the Grand Junction Projects Office Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, is also the remedial action contractor. Building 44 was radiologically contaminated and the building was demolished in 1994. The soil area within the footprint of the building was not contaminated; it complies with the identified standards and the area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building

  1. Final audit report of remedial action construction at the UMTRA Project Mexican Hat, Utah -- Monument Valley, Arizona, sites

    International Nuclear Information System (INIS)

    1995-10-01

    The final audit report for remedial action at the Mexican Hat, Utah, Monument Valley, Arizona, Uranium Mill Tailings Remedial Action (UMTRA) Project sites consists of a summary of the radiological surveillances/audits, quality assurance (QA) in-process surveillances, and QA remedial action close-out inspections performed by the US Department of Energy (DOE) and the Technical Assistance Contractor (TAC); on-site construction reviews (OSCR) performed by the US Nuclear Regulatory Commission (NRC); and a surveillance performed by the Navajo Nation. This report refers to remedial action activities performed at the Mexican Hat, Utah--Monument Valley, Arizona, Uranium Mill Tailings Remedial Action (UMTRA) Project sites

  2. Kalispel Resident Fish Project, 2005-2006 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Olson, Jason; Andersen, Todd (Kalispel Natural Resource Department, Usk, WA)

    2006-07-01

    In 2005 the Kalispel Natural Resource Department (KNRD) monitored its current enhancement projects for bull trout (Salvelinus confluentus) and westslope cutthroat trout (Oncorhynchus clarki lewisi). Largemouth Bass (Micropterus salmoides) enhancement projects were also monitored. Additional baseline fish population and habitat assessments were conducted, in East River and several of its tributaries.

  3. Community-based carbon sequestration in East Africa: Linking science and sustainability

    Science.gov (United States)

    Hultman, N. E.

    2004-12-01

    International agreements on climate change have set the stage for an expanding market for greenhouse gas emissions reduction credits. Projects that can generate credits for trading are diverse, but one of the more controversial types involve biological carbon sequestration. For several reasons, most of the activity on these "sinks" projects has been in Latin America and Southeast Asia. Yet people in sub-saharan Africa could benefit from properly implemented projects. This poster will discuss estimates of the potential and risks of such projects in East Africa, and will describe in detail a case study located in central Tanzania and now part of the World Bank's BioCarbon Fund portfolio. Understanding climate variability and risk can effectively link international agreements on climate change, local realities of individual projects, and the characteristics of targeted ecosystems.

  4. Toka Boot/The Big Jam: Making Music in Rural East Timor

    Science.gov (United States)

    Howell, Gillian; Dunphy, Kim

    2012-01-01

    This article discusses a community music project in rural East Timor. Australian musician Gillian Howell lived for three months in the isolated town of Lospalos as an Asialink artist-in-residence, where she worked with local community members and visiting Australian musicians to share music and ideas, and to communicate across cultures. Three…

  5. Poverty, Job Quality and Labor Market Dynamics in the Middle East ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Unemployment is one of the main economic, social and political problems facing governments in the Middle East and North Africa. The nature and ... This project will explore links between labour market dynamics and the quality of jobs in three varied settings. ... Effects of the new labor law on informality & job quality. 41985.

  6. Biorefinery Demonstration Project Final Progress Report

    Energy Technology Data Exchange (ETDEWEB)

    Lee, David [University of Georgia Research Foundation, Inc., Athens, GA (United States)

    2015-10-20

    In this project we focused on various aspects of biorefinery technology development including algal-biorefinery technology, thermochemical conversion of biomass to bio-oils and biochar; we tested characteristics and applications of biochars and evaluated nutrient cycling with wastewater treatment by the coupling of algal culture systems and anaerobic digestion. Key results include a method for reducing water content of bio-oil through atomized alcohol addition. The effect included increasing the pH and reducing the viscosity and cloud point of the bio-oil. Low input biochar production systems were evaluated via literature reviews and direct experimental work. Additionally, emissions were evaluated and three biochar systems were compared via a life cycle analysis. Attached growth systems for both algal cultivation and algal harvesting were found to be superior to suspended growth cultures. Nutrient requirements for algal cultivation could be obtained by the recycling of anaerobic digester effluents, thus experimentally showing that these two systems could be directly coupled. Twenty-two journal articles and six intellectual property applications resulted from the cumulative work that this project contributed to programmatically.

  7. The Workplace Literacy System Project (WLS). Final Performance Report.

    Science.gov (United States)

    Poulton, Bruce R.

    The Workplace Literacy System Project (WLS) prepared interactive CD-ROM discs containing about 50 hours of instruction and drill in basic skills presented within the context of the textile/apparel manufacturing industry. The project was conducted at a Sara Lee knit products plant in North Carolina. During the project, literacy task analyses were…

  8. Project Aprendizaje. 1990-91 Final Evaluation Profile. OREA Report.

    Science.gov (United States)

    New York City Board of Education, Brooklyn, NY. Office of Research, Evaluation, and Assessment.

    An evaluation was done of New York City Public Schools' Project Aprendizaje, which served disadvantaged, immigrant, Spanish-speaking high school students at Seward Park High School in Manhattan. The Project enrolled 290 students in grades 9 through 12, 93.1 percent of whom were eligible for the Free Lunch Program. The Project provided students of…

  9. Project Ta-kos Outreach. Final Report.

    Science.gov (United States)

    Askew, Linda; And Others

    The Project Ta-kos Outreach program is an inservice training model designed to increase the probability that children (ages birth to 8) at risk for or with special needs and their families can access and receive appropriate services in order to remain an integral part of the community in which they reside. The program reflects an ecological…

  10. IRRSUD Project - Final report

    CERN Document Server

    Loyer, F

    2002-01-01

    IRRSUD is an irradiation facility which makes use of the low energy (0.5 MeV/n - 1 MeV/n) beams from the GANIL IRRSUD injectors. It is financed by the group GARI (Group of Ion Research Applications) and was established as a joint-venture of GANIL and CIRIL to develop the applied physics and ion based industrial applications. Among research directions framed by IRRSUD one can mention; the nano-technologies i.e. utilisation of the modifications induced in materials exposed to ion bombardment; realization of microporous membranes and low-D materials; aging of materials by irradiation. Also, the low energy ions issued from the injector matches very well the fission fragments in reactors. In addition IRRSUD could be used as testing facility for injectors.. The report is structured as follows: 1. Outline; 1.2. Project's main features; 1.3. Ion beam characterization; 2. Technical solutions; 2.1. Denominations; 2.2. Beam optics; 2.3. Beam bending magnets; 2.4. Beam instrumentation; 2.5. Current supply; 2.6. Vacuum sy...

  11. Forecasting The Onset Of The East African Rains

    Science.gov (United States)

    MacLeod, D.; Palmer, T.

    2017-12-01

    The timing of the rainy seasons is critical for East Africa, where many livelihoods depend on rain-fed agriculture. The exact onset date of the rains varies from year to year and a delayed start has significant implications for food security. Early warning of anomalous onset can help mitigate risks by informing farmer decisions on crop choice and timing of planting. Onset forecasts may also pre-warn governments and NGOs of upcoming need for financial support and humanitarian intervention. Here we assess the potential to forecast the onset of both the short and long rains over East Africa at subseasonal to seasonal timescales. Based on operational reforecasts from ECMWF, we will demonstrate skilful prediction of onset anomalies. An investigation to determine potential sources of this forecast skill will also be presented. This work has been carried out as part of the project ForPAc: "Towards forecast-based preparedness action".

  12. SESAME: physics for peace in the Middle East

    CERN Multimedia

    2008-01-01

    Allan, Jordan: a bridge of peace between nations is being constructed with the help of particle physics. Scheduled to be operational by 2011, SESAME, the Synchrotron-light for Experimental Science and Applications in the Middle East, brings together countries from all over the region. SESAME construction site (Photo R. Sarraf, copyright: Al-Balqa Applied University). On the east bank of the river Jordan, 30 km from Amman, lies SESAME. A collaboration of nine members, including Jordan, Israel, Pakistan, Turkey, Egypt and Palestine, the project was created under the auspices of UNESCO. Following the same model as CERN, the underlying expectation is that SESAME will encourage peace by training a new generation of scientists from all over the region to work on a new synchrotron facility. Just as scientists from all over Europe collaborated at CERN in the aftermath of the Second World War, SESAME hopes to provide an environment where ...

  13. Environmental change in south-east Asia. People, politics and sustainable development

    International Nuclear Information System (INIS)

    Parnwell, M.J.G.; Bryant, R.L.

    1996-01-01

    The interaction of politics and ecology in the quest for sustainable development in South East Asia is explored in this book by contributors who provide a broad range of perspectives. In the first of the four main sections, the political context of ecological change is examined. The topics discussed are: Indonesia and Thailand in a globalising pulp and paper industry; environmental organisations and different political contexts in Malaysia, Indonesia and Vietnam; Japan and South East Asia's environment. Some of the processes and forms of human-induced environmental change are illustrated in the second section. These include: the search for sustainable livelihoods in Indonesian transmigration settlements; the 210 MW hydro-power project on the Theun river in Laos which illustrates the tensions between environmental costs and potential economic benefits; forest management in Laos. Discussion of the various methods which strengthen understanding of human-induced environmental change in the region is integrated with further illustrations of its process and context in the third section where the following are considered: environmental change in Malaysian Borneo; the value of remote sensing and geographical information systems in mapping the environment; the weakness of Vietnam's tropical forestry action plan. In the final section, an examination of some of the options for change which are necessary if sustainable development is to become a reality includes: the sustainability of ecotourism in Indonesia; the potential stewardship role of the Bajau people in Indonesia's proposed marine parks; environmental degradation, non-timber forest products and Iban communities in Sarawak; conservation and development in Brunei's rainforests; Philippine community-based forest management. (27 figures; 23 tables; 752 references) (UK)

  14. SOLERAS - Solar Controlled Environment Agriculture Project. Final report, Volume 1. Project summary

    Energy Technology Data Exchange (ETDEWEB)

    1985-12-30

    A summary of the Solar Controlled Environment Agriculture Project is presented. The design of the greenhouses include transparent double pane glass roof with channels for fluid between the panes, inner pane tinted and double pane extruded acrylic aluminized mylar shade and diffuser. Solar energy technologies provide power for water desalination, for pumping irrigation water, and for cooling and heating the controlled environment space so that crops can grow in arid lands. The project is a joint effort between the United States and Saudi Arabia. (BCS)

  15. Biowaste fuels South-East Asian COGEN schemes

    International Nuclear Information System (INIS)

    Pennington, M.

    1998-01-01

    This article reports on the COGEN Programme of the European Commission in association with the Association of South East Asian Nations (ASEAN), and considers the benefits of using biowaste for the production of energy using cogeneration with the corresponding reduction in the emission of greenhouse gases. The substitution of rice husks for the fuel in a cogeneration plant at a Thai rice mill, and the combustion of wood in the cogeneration plant at the Homet Raya plant in Malaysia are described, and details are given of the backgrounds to the projects, locations, the technologies used, and the process economics. The next phase of the COGEN programme due to start in 1998 which will see the programme expanded to include coal-fired and gas-fired cogeneration projects is discussed

  16. Environmental perspectives on the East Coast offshore oil and gas industry

    International Nuclear Information System (INIS)

    Taylor, D.G.

    2001-01-01

    In this presentation, the author examined the environmental aspects affecting the offshore oil and gas development on the East Coast of Canada. Selected topics were covered to highlight what has been accomplished and the goals for the future in terms of the environment. The development of the oil and gas industry in the region has really taken off in the past twenty years, suffering from growing pains and enduring myths. An oil and gas project begins with seismic surveys, followed by exploratory wells being drilled, then proceeding to the construction and installation of the drilling production facilities, the production phase and the decommissioning of the facilities at the end of the useful life. Each phase of a project was reviewed and environmental concerns identified. Specific topics were addressed, such as drill cuttings, produced water, flaring, and decommissioning and abandonment. Selected problems were examined, notably fish and oil, spills, cumulative effects, the Oceans Act, and the regulatory evolution in the East Coast offshore. 9 refs., 1 tab., 1 fig

  17. Sustainable development in city districts: BaLaLuZ project - Bellevaux; Quartier de Bellevaux - Lausanne. Rapport final de la phase 1

    Energy Technology Data Exchange (ETDEWEB)

    Gay, J.-B.; Montavon, M. [Swiss Federal Institute of Technology (EPFL), Laboratoire d' Energie solaire et de physique du batiment (LESO-PB), Lausanne (Switzerland); Muehll, D. von der [Swiss Federal Institute of Technology (EPFL), Laboratoire de Dynamiques territoriales (LADYT), Lausanne (Switzerland); Malatesta, D. [Ecole d' Etudes sociales et pedagogiques (EESP), Lausanne (Switzerland); Cunha, A. da; Dind, J.-P. [University of Lausanne, Institut de Geographie (UNIL-IGUL), Lausanne (Switzerland)

    2004-07-01

    This final report for the Swiss Federal Office of Energy (SFOE) is one of a series of reports concerning municipal development in various cities in Switzerland. The four city districts involved include Basel (Gundeldinger Feld), Lausanne (Bellevaux), Lucerne (Basel-/Bernstrasse) and Zurich (Werdwies). This final report summarises the results of the first phase of the project in the Bellevaux district of Lausanne. The work done in the first phase is reviewed: A database with details on 240 buildings was set up, a pilot analysis of a building was carried out and suggestions for renovation work were made. Also, a socio-economic analysis of the district was made and the expectations of inhabitants were noted. Mobility was critically analysed and first possibilities in the urban planning area were looked at. Recommendations for the second phase of the project are presented.

  18. Middle East energy megaprojects after the millennium: the need to start now

    International Nuclear Information System (INIS)

    Shammas, Pierre

    1997-01-01

    The Middle East and North Africa (MENA) region will become the heart of the world energy supply in the new millennium. Integrated energy megaprojects upon which the oil majors want to embark will be urgently needed and given typical lead times of five to ten years need to be started now. Although perhaps in the most unstable part of the energy world, MENA has the potential to become the most profitable market for such projects in the light of such factors as the security of world energy supply and the decrease in commercial oil inventories. Other considerations include the link between MENA's political stability and socio-economic reforms, and the influence of multinational organisations in promoting privatisation and structural change. A key factor is the link between the Middle East peace process and economic growth. The integrated megaprojects include the Middle East loop of gas pipelines to supply Europe and Asia. Together with the related mini independent power projects and communications links, this will raise MENA living standards and promote MENA's growing liquefied natural gas business. In the energy integration of MENA with both Europe and Asia, Turkey, Egypt, Iran and Iraq will have major roles to play. Data on MENA power requirements to 2005 and private wealth in the Arab world are appended. (2 tables). (UK)

  19. Seasonal prediction of East Asian summer rainfall using a multi-model ensemble system

    Science.gov (United States)

    Ahn, Joong-Bae; Lee, Doo-Young; Yoo, Jin‑Ho

    2015-04-01

    Using the retrospective forecasts of seven state-of-the-art coupled models and their multi-model ensemble (MME) for boreal summers, the prediction skills of climate models in the western tropical Pacific (WTP) and East Asian region are assessed. The prediction of summer rainfall anomalies in East Asia is difficult, while the WTP has a strong correlation between model prediction and observation. We focus on developing a new approach to further enhance the seasonal prediction skill for summer rainfall in East Asia and investigate the influence of convective activity in the WTP on East Asian summer rainfall. By analyzing the characteristics of the WTP convection, two distinct patterns associated with El Niño-Southern Oscillation developing and decaying modes are identified. Based on the multiple linear regression method, the East Asia Rainfall Index (EARI) is developed by using the interannual variability of the normalized Maritime continent-WTP Indices (MPIs), as potentially useful predictors for rainfall prediction over East Asia, obtained from the above two main patterns. For East Asian summer rainfall, the EARI has superior performance to the East Asia summer monsoon index or each MPI. Therefore, the regressed rainfall from EARI also shows a strong relationship with the observed East Asian summer rainfall pattern. In addition, we evaluate the prediction skill of the East Asia reconstructed rainfall obtained by hybrid dynamical-statistical approach using the cross-validated EARI from the individual models and their MME. The results show that the rainfalls reconstructed from simulations capture the general features of observed precipitation in East Asia quite well. This study convincingly demonstrates that rainfall prediction skill is considerably improved by using a hybrid dynamical-statistical approach compared to the dynamical forecast alone. Acknowledgements This work was carried out with the support of Rural Development Administration Cooperative Research

  20. A ProCoS II Project Final Report: ESPRIT Basic Research project 707

    DEFF Research Database (Denmark)

    Bowen, J. P.; Hoare, C. A. R.; Langmaack, Hans

    1996-01-01

    An overview of the research and associated activities of the Europeancollaborative ESPRIT Basic Research ProCoS II project (no. 7071) on``Provably Correct Systems'' which ran from 1992 to 1995 is presented.This was a follow-on project to ProCoS (no. 3104) and ran inparallel with the ProCoS Working...

  1. Final report investigation project agricultural products and environment

    International Nuclear Information System (INIS)

    Loria, L.G.; Jimenez Dam, R.; Mora Rodriguez, P.

    1998-01-01

    The document presents the after-action report on six investigation projects: Thermoluminescence, Spectrometry gamma of low level, Agricultural products, Radon in the subsoil, Nuclear instrumentation, and X-ray fluorescence, executed between 1995-1997 by the Laboratory of Physical Nuclear Applied of the University of Costa Rica, in the which objectives are shown, applied methodology as well as the achievements and results each project. (Author) [es

  2. Final Technical Report for Year 5 Early Career Research Project "Viscosity and equation of state of hot and dense QCD matter"

    Energy Technology Data Exchange (ETDEWEB)

    Molnar, Denes [Purdue Univ., West Lafayette, IN (United States)

    2016-05-25

    The Section below summarizes research activities and achievements during the fifth (last) year of the PI’s Early Career Research Project (ECRP). Unlike the first four years of the project, the last year was not funded under the American Recovery and Reinvestment Act (ARRA). The ECRP advanced two main areas: i) radiative 3 ↔ 2 radiative transport, via development of a new computer code MPC/Grid that solves the Boltzmann transport equation in full 6+1D (3X+3V+time); and ii) application of relativistic hydrodynamics, via development of a self-consistent framework to convert viscous fluids to particles. In Year 5 we finalized thermalization studies with radiative gg ↔ ggg transport (Sec. 1.1.1) and used nonlinear covariant transport to assess the accuracy of fluid-to-particle conversion models (Sec. 1.1.2), calculated observables with self-consistent fluid-to-particle conversion from realistic viscous hydrodynamic evolution (Secs. 1.2.1 and 1.2.2), extended the covariant energy loss formulation to heavy quarks (Sec. 1.4.1) and studied energy loss in small systems (Sec. 1.4.2), and also investigated how much of the elliptic flow could have non-hydrodynamic origin (Sec 1.3). Years 1-4 of the ECRP were ARRA-funded and, therefore, they have their own report document ’Final Technical Report for Years 1-4 of the Early Career Research Project “Viscosity and equation of state of hot and dense QCD matter”’ (same award number DE-SC0004035). The PI’s group was also part of the DOE JET Topical Collaboration, a multi-institution project that overlapped in time significantly with the ECRP. Purdue achievements as part of the JET Top- ical Collaboration are in a separate report “Final Technical Report summarizing Purdue research activities as part of the DOE JET Topical Collaboration” (award DE-SC0004077).

  3. 76 FR 76153 - Grand Coulee Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted...

    Science.gov (United States)

    2011-12-06

    ... Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted for Filing and... Hydroelectric Project (Scooteney Inlet Project or project) to be located on the Potholes East Canal, which is an..., Grand Coulee Project Hydroelectric Authority, P.O. Box 219, Ephrata, WA 98823; phone: (509) 754-2227...

  4. All projects related to | Page 65 | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Region: Central Asia, Far East Asia, South Asia, Cambodia, China, Laos, Viet Nam, Thailand. Program: Food, Environment, and Health. Total Funding: CA$ 399,700.00. Control and Elimination of Helminth Zoonoses in the Greater Mekong Subregion. Project. This project will contribute evidence to help control and eliminate ...

  5. 360 Degrees Project: Final Report of 1972-73. National Career Education Television Project.

    Science.gov (United States)

    Wisconsin Univ., Madison. Univ. Extension.

    Project 360 Degrees was a mass-media, multi-State, one-year effort in adult career education initiated by WHA-TV, the public television station of the University of Wisconsin-Extension, and funded by the U.S. Office of Education. The overall goal of the project was to provide, through a coordinated media system, information and motivation that…

  6. Jobs and Self-Sufficiency: Goals of the Project, "Technical Support Services to the Developmentally Disabled, Region III." Final Report, October 1976 to September 1979.

    Science.gov (United States)

    Mallik, Kalisankar; Shaver, Elaine M.

    The final report of a 3 year project to improve the quality of life of mentally retarded, cerebral palsied, and epileptic persons in Region III is presented. The first section details the efforts of the project staff in providing competitive employment opportunities or sheltered employment for 40 severely disabled persons. Equipment modification…

  7. Experiences with IAEA project: TC Regional Project on Quality Control and Quality Assurance for Nuclear Analytical Techniques (RER/2/004)

    International Nuclear Information System (INIS)

    Glavic-Cindro, Denis; Korun, Matjaz

    2002-01-01

    In the TC Regional Project on Quality Control and Quality Assurance for Nuclear Analytical Techniques RER/2/004, 12 laboratories from east and central European countries participated. Within this project 4 workshops, 2 audit inspections and 2 proficiency tests were organized. The aim of this project was to help these laboratories to implement quality assurance system based on the ISO 17025 standard and to help them on the way towards accreditation. (author)

  8. Surface and subsurface cleanup protocol for radionuclides, Gunnison, Colorado, UMTRA project processing site: Final

    International Nuclear Information System (INIS)

    1994-01-01

    Thorium 230 (Th-230) at the Gunnison, Colorado processing site will require remediation, however, a seasonally fluctuating groundwater table at the site significantly complicates conventional remedial action with respect to cleanup. Therefore, to effectively remediate the site with respect to Radium 226 (Ra-226) and Th-230, the following supplemental standard is proposed: In situ Ra-26 will be remediated to the EPA soil cleanup standards independent of groundwater considerations. In situ Th-230 concentrations will be remediated in the region above the encountered water table so the 1000-year projected Ra-226 concentration complies with the EPA soil cleanup concentration limits. If elevated Th-230 persists to the water table, an additional foot of excavation will be performed and the grid will be backfilled. Excavated grids will be backfilled to the final remedial action grade with clean cobbly soil. Final grid verification that is required below the water table will be performed by extracting and analyzing a single bulk soil sample with the bucket of a backhoe. Modeled surface radon flux values will be estimated and documented. A recommendation will be made that land records should be annotated to identify the presence of residual Th-230

  9. Application of e-beam welding in W/Cu divertor project for EAST

    International Nuclear Information System (INIS)

    Wang, Wanjing; Li, Qiang; Zhao, Sixiang; Xu, Yue; Wei, Ran; Cao, Lei; Yao, Damao; Qin, Sigui; Peng, Lingjian; Shi, Yingli; Pan, Ningjie; Liu, Guohui; Li, Hui; Luo, Guang-Nan

    2015-01-01

    Highlights: • To develop the actively cooled W/Cu components, we have to meet the application of EBW. • In this work, the microstructure of the fusion zone and the mechanical properties of Cu−Cu and Cu−Ni joint welded by EBW have been investigated. • In the practice of quality control, it was found that under present standard the helium leak detection is unreliable. Thus the UT has been introduced and the premier results have shown it's effective. • In addition, the control of configuration tolerance has also been investigated. And a solidified welding procedure with jigs was established before the batch production. - Abstract: In the development of EAST actively cooled W/Cu components, the ITER-grade CuCrZr has been chosen as the heat sink material for its good thermomechanics properties. To realize the seal joint of the heat sink, a large number of electron beam welding (EBW) of CuCrZr/CuCrZr or CuCrZr/Inconel625 has been carried out. In the quality control of the W/Cu components, the helium leak detection at thermal condition has been performed on the entire components before delivery. However, in the operation of EAST device some micro leak on the components was detected indicating that the helium leak detection under present standard was unreliable for the quality control. Therefore, the ultrasonic non-destructive testing technique was introduced to exclude the defects. In addition, the welding shrinkage and bending has also been investigated to meet the required tight tolerances for plasma-facing components in vacuum vessel.

  10. Application of e-beam welding in W/Cu divertor project for EAST

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Wanjing, E-mail: wjwang@ipp.ac.cn [Institute of Plasma Physics, Chinese Academy of Sciences (ASIPP), Hefei, Anhui (China); Li, Qiang; Zhao, Sixiang; Xu, Yue; Wei, Ran; Cao, Lei; Yao, Damao [Institute of Plasma Physics, Chinese Academy of Sciences (ASIPP), Hefei, Anhui (China); Qin, Sigui; Peng, Lingjian; Shi, Yingli; Pan, Ningjie; Liu, Guohui [Advanced Technology and Materials Company - AT& M, Beijing (China); Li, Hui [Beijing Zhongke Electric Co. Ltd., Beijing (China); Luo, Guang-Nan [Institute of Plasma Physics, Chinese Academy of Sciences (ASIPP), Hefei, Anhui (China)

    2015-10-15

    Highlights: • To develop the actively cooled W/Cu components, we have to meet the application of EBW. • In this work, the microstructure of the fusion zone and the mechanical properties of Cu−Cu and Cu−Ni joint welded by EBW have been investigated. • In the practice of quality control, it was found that under present standard the helium leak detection is unreliable. Thus the UT has been introduced and the premier results have shown it's effective. • In addition, the control of configuration tolerance has also been investigated. And a solidified welding procedure with jigs was established before the batch production. - Abstract: In the development of EAST actively cooled W/Cu components, the ITER-grade CuCrZr has been chosen as the heat sink material for its good thermomechanics properties. To realize the seal joint of the heat sink, a large number of electron beam welding (EBW) of CuCrZr/CuCrZr or CuCrZr/Inconel625 has been carried out. In the quality control of the W/Cu components, the helium leak detection at thermal condition has been performed on the entire components before delivery. However, in the operation of EAST device some micro leak on the components was detected indicating that the helium leak detection under present standard was unreliable for the quality control. Therefore, the ultrasonic non-destructive testing technique was introduced to exclude the defects. In addition, the welding shrinkage and bending has also been investigated to meet the required tight tolerances for plasma-facing components in vacuum vessel.

  11. Resource Conservation and Recovery Act ground-water monitoring projects for Hanford facilities: Progress Report for the Period April 1 to June 30, 1989

    Energy Technology Data Exchange (ETDEWEB)

    Smith, R.M.; Bates, D.J.; Lundgren, R.E.

    1989-09-01

    This report describes the progress of 13 Hanford ground-water monitoring projects for the period April 1 to June 30, 1989. These projects are for the 300 area process trenches (300 area), 183-H solar evaporation basins (100-H area), 200 areas low-level burial grounds, nonradioactive dangerous waste landfill (southeast of the 200 areas), 1301-N liquid waste disposal facility (100-N area), 1324-N surface impoundment and 1324-NA percolation pond (100-N area), 1325-N liquid waste disposal facility (100-N area), 216-A-10 crib (200-east area), 216-A-29 ditch (200-east area), 216-A-36B crib (200-east area), 216-B-36B crib (200-east area), 216-B-3 pond (east of the 200-east area), 2101-M pond (200-east area), grout treatment facility (200-east area).

  12. Wabash River Coal Gasification Repowering Project: A DOE Assessment; FINAL

    International Nuclear Information System (INIS)

    National Energy Technology Laboratory

    2002-01-01

    The goal of the U.S. Department of Energy (DOE) Clean Coal Technology Program (CCT) is to furnish the energy marketplace with a number of advanced, more efficient, and environmentally responsible coal utilization technologies through demonstration projects. These projects seek to establish the commercial feasibility of the most promising advanced coal technologies that have developed beyond the proof-of-concept stage. This document serves as a DOE post-project assessment (PPA) of a project selected in CCT Round IV, the Wabash River Coal Gasification Repowering (WRCGR) Project, as described in a Report to Congress (U.S. Department of Energy 1992). Repowering consists of replacing an existing coal-fired boiler with one or more clean coal technologies to achieve significantly improved environmental performance. The desire to demonstrate utility repowering with a two-stage, pressurized, oxygen-blown, entrained-flow, integrated gasification combined-cycle (IGCC) system prompted Destec Energy, Inc., and PSI Energy, Inc., to form a joint venture and submit a proposal for this project. In July 1992, the Wabash River Coal Gasification Repowering Project Joint Venture (WRCGRPJV, the Participant) entered into a cooperative agreement with DOE to conduct this project. The project was sited at PSI Energy's Wabash River Generating Station, located in West Terre Haute, Indiana. The purpose of this CCT project was to demonstrate IGCC repowering using a Destec gasifier and to assess long-term reliability, availability, and maintainability of the system at a fully commercial scale. DOE provided 50 percent of the total project funding (for capital and operating costs during the demonstration period) of$438 million

  13. Bangbang controller design and implementation for EAST vertical instability control

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Yuehang, E-mail: wagn8901@mail.ustc.edu.cn [University of Science and Technology of China, Hefei (China); Xiao, Bingjia, E-mail: bjxiao@ipp.ac.cn [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei (China); University of Science and Technology of China, Hefei (China); Liu, Lei, E-mail: liulei@ipp.ac.cn [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei (China); Yuan, Qiping, E-mail: qpyuan@ipp.ac.cn [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei (China)

    2016-11-15

    Highlights: • The linearized plasma vertical response model is designed and analysed. • The Bangbang controller for EAST vertical displacement is designed. • The Bangbang controller is optimized for time delay of control system. • We investigate efficacy of Bangbang controller with simulations. • Performance of the controller is roughly given by experiments. - Abstract: In the EAST 2014 campaign, a new internal coil (IC) power supply was used in order to enhance the control over the plasma’s vertical instabilities. The IC power supply now allows for current and voltage working modes with much higher peak voltages and currents and faster response time. In comparison the previous power supply only allowed for the current mode. A Bangbang and PID composite controller has been designed for the voltage mode based on optimal control theory and the RZIP rigid plasma response model. This paper will demonstrate that faster and enhanced controllability are realized with the combination of Bangbang and PID controller. For the large z position drift, the Bangbang controller will export the maximum voltage to achieve much faster power supply response and slow the vertical displacement events (VDEs). The PID controller is used for the small z drifts which will finally stabilize the VDEs with minimum z position oscillation. Furthermore, to evaluate the time latency of this control system and power supply, the stability and performance of the closed loop were simulated and analysed. This controller was finally implementation and test on EAST using the Quasi-snowflake shape which achieved growth rates of 500 s{sup −1}. This paper shows that the new power supply using the bangbang + PID controller can significantly enhance the control over vertical instabilities.

  14. Final Report - Navajo Electrification Demonstration Project - FY2004

    Energy Technology Data Exchange (ETDEWEB)

    Kenneth L. Craig, Interim General Manager

    2007-03-31

    The Navajo Electrification Demonstration Project (NEDP) is a multi-year projects which addresses the needs of unserved Navajo Nation residents without basic electricity services. The Navajo Nation is the United States' largest tribe, in terms of population and land. An estimated 18,000 Navajo Nation homes do not have basic grid-tied electricity--and this third year of funding, known as NEDP-3, provided 351 power line extensions to Navajo families.

  15. All projects related to | Page 333 | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Region: Haiti, North and Central America, Sri Lanka, Liberia, North of Sahara, South of Sahara, South America, Central Asia, Far East Asia, South Asia. Program: Governance and Justice. Total Funding: CA$ 434,400.00. Diaspora Impact on the Capacity for Recovery from Conflict and Crisis. Project. This project will support ...

  16. NTRCI Legacy Engine Research and Development Project Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Smith-Holbert, Connie [National Transportation Research Center, Inc., Knoxville, TN (United States); Petrolino, Joseph [National Transportation Research Center, Inc., Knoxville, TN (United States); Watkins, Bart [Power Source Technologies Inc., Corvallis, OR (United States); Irick, David [Power Source Technologies Inc., Corvallis, OR (United States)

    2011-12-31

    The Legacy engine is a completely new design, transitional diesel engine, replacing the reciprocating engine with a rotary engine. The Legacy engine offers significant advances over conventional internal combustion engines in 1) power to weight ratio; 2) multiple fuel acceptance; 3) fuel economy; and 4) environmental compliance. These advances are achieved through a combination of innovative design geometry, rotary motion, aspiration simplicity, and manufacturing/part simplicity. The key technical challenge to the Legacy engine's commercialization, and the focus of this project, was the development of a viable roton tip seal. The PST concept for the roton tip seal was developed into a manufacturable design. The design was evaluated using a custom designed and fabricated seal test fixture and further refined. This design was incorporated into the GEN2.5A prototype and tested for achievable compression pressure. The Decision Point at the end of Phase 1 of the project (described below) was to further optimize the existing tip seal design. Enhancements to the tip seal design were incorporated into the GEN2.5B prototype and tested and evaluated using the iterative research strategy described below. Compression pressures adequate for compression ignition of diesel fuel were achieved, although not consistently in all combustion volumes. The variation in compression pressures was characterized versus design features. As the roton tip seal performance was improved, results pointed toward inadequate performance of the housing side seals. Enhancement of the housing side seal system was accomplished using a custom designed side seal test fixture. The design enhancements developed with the test fixture were also incorporated into the GEN2.5B prototype and tested and evaluated using the iterative research strategy described below. Finally, to simplify the requirements for the roton tip seals and to enhance the introduction and combustion of fuel, a flush-mount fuel injector

  17. Real time equilibrium reconstruction algorithm in EAST tokamak

    International Nuclear Information System (INIS)

    Wang Huazhong; Luo Jiarong; Huang Qinchao

    2004-01-01

    The EAST (HT-7U) superconducting tokamak is a national project of China on fusion research, with a capability of long-pulse (∼1000 s) operation. In order to realize a long-duration steady-state operation of EAST, some significant capability of real-time control is required. It would be very crucial to obtain the current profile parameters and the plasma shapes in real time by a flexible control system. As those discharge parameters cannot be directly measured, so a current profile consistent with the magnetohydrodynamic equilibrium should be evaluated from external magnetic measurements, based on a linearized iterative least square method, which can meet the requirements of the measurements. The arithmetic that the EFIT (equilibrium fitting code) is used for reference will be given in this paper and the computational efforts are reduced by parameterizing the current profile linearly in terms of a number of physical parameters. In order to introduce this reconstruction algorithm clearly, the main hardware design will be listed also. (authors)

  18. Glass fibre sensors for medical applications - fibre-optical dosimeter system. Cooperation project 1991-1994. Final report

    International Nuclear Information System (INIS)

    1996-01-01

    The final report summarizes the results of a cooperation project on the applications of fibre-optical sensors in medical technology. The FADOS dosimeter system is presented which comprises an implantable glass fibre dosimeter. It can be applied in radiotherapy for online dose metering directly at the tumour or in the surrounding healthy tissue. The dosimeter is placed in a tissue-compatible flexible catheter tube and remains inside the body during the radiotherapy treatiment. The measuring principle is based on the effect of radiation-induced damping inside a glass fibre. (DG) [de

  19. OECD-IAEA Paks Fuel Project. Final Report

    International Nuclear Information System (INIS)

    2010-05-01

    It is important for nuclear power plant designers, operators and regulators to effectively use lessons learned from events occurring at nuclear power plants since, in general, it is impossible to reproduce the event using experimental facilities. In particular, evaluation of the event using accident analysis codes is expected to contribute to improving understanding of phenomena during the events and to facilitate the validation of computer codes through simulation analyses. The information presented in this publication will be of use in future revisions of safety guides on accident analysis. During a fuel crud removal operation on the Paks-2 unit of the Paks nuclear power plant, Hungary on 10 April 2003, several fuel assemblies were severely damaged. The assemblies were being cleaned in a special tank under deep water in a service pit connected to the spent fuel storage pool. The first sign of fuel failures was the detection of some fission gases released from the cleaning tank. Later, visual inspection revealed that most of the 30 fuel assemblies suffered heavy oxidation and fragmentation. The first evaluation of the event showed that the severe fuel damage had been caused by inadequate cooling. The Paks-2 event was discussed in various committees of the OECD Nuclear Energy Agency (OECD/NEA) and of the International Atomic Energy Agency (IAEA). Recommendations were made to undertake actions to improve the understanding of the incident sequence and of the consequence this had on the fuel. It was considered that the Paks-2 event may constitute a useful case for a comparative exercise on safety codes, in particular for models devised to predict fuel damage and potential releases under abnormal cooling conditions and the analyses of the Paks-2 event may provide information which is relevant for in-reactor and spent fuel storage safety evaluations. The OECD-IAEA Paks Fuel Project was established in 2005 as a joint project between the IAEA and the OECD/NEA. The IAEA

  20. Autonomous Energy Sources in the North of the Far East: Current State and Directions of Diversification

    Directory of Open Access Journals (Sweden)

    Boris Grigorievich Saneev

    2018-03-01

    Full Text Available The paper presents the current state of autonomous energy sources in the north of the Far East. Consideration is given to the capacity structures with a focus on industrial and residential autonomous energy sources. One of the main problems facing power supply to residential consumers in the north of the Far East is the insufficiently developed transport infrastructure, which causes complicated fuel delivery patterns, fuel price rise, and hence high electricity generation cost. The changes in the installed capacity of renewable energy sources (RES in the north of the Far East are demonstrated for the period between 2011 and 2015. The research shows the main directions of power production diversification in the north of the Far East. The directions include the use of local fuel types, the development of cogeneration, the involvement of renewable energy sources and small-scale nuclear power plants. The paper presents a forecast for the renewable energy development in the north of the Far East up to 2035, made by the authors. The priority RES projects in the off-grid power supply in the north of the Far East are wind and solar power plants

  1. Short communication: Genomic selection in a crossbred cattle population using data from the Dairy Genetics East Africa Project.

    Science.gov (United States)

    Brown, A; Ojango, J; Gibson, J; Coffey, M; Okeyo, M; Mrode, R

    2016-09-01

    Due to the absence of accurate pedigree information, it has not been possible to implement genetic evaluations for crossbred cattle in African small-holder systems. Genomic selection techniques that do not rely on pedigree information could, therefore, be a useful alternative. The objective of this study was to examine the feasibility of using genomic selection techniques in a crossbred cattle population using data from Kenya provided by the Dairy Genetics East Africa Project. Genomic estimated breeding values for milk yield were estimated using 2 prediction methods, GBLUP and BayesC, and accuracies were calculated as the correlation between yield deviations and genomic breeding values included in the estimation process, mimicking the situation for young bulls. The accuracy of evaluation ranged from 0.28 to 0.41, depending on the validation population and prediction method used. No significant differences were found in accuracy between the 2 prediction methods. The results suggest that there is potential for implementing genomic selection for young bulls in crossbred small-holder cattle populations, and targeted genotyping and phenotyping should be pursued to facilitate this. Copyright © 2016 American Dairy Science Association. Published by Elsevier Inc. All rights reserved.

  2. KEY COMPARISON: Final report of EUROMET Project 696: pH determination of a phthalate buffer

    Science.gov (United States)

    Spitzer, Petra; Charlet, Philippe; Eberhard, Ralf; Karpov, Oleg V.; Philippe, Rachel; Rivier, Cedric; Maximov, Igor; Sudmeier, Uwe

    2005-01-01

    The EUROMET project 696, a trilateral comparison between PTB, Germany, LNE, France and VNIIFTRI, Russia was performed in order to demonstrate and document the capability of the participants to measure the pH of a phthalate buffer by the primary measurement procedure for pH. Good agreement of the reported results was observed. The sample was very similar to the one used in the comparison CCQM-K17. PTB acts as pilot laboratory in CCQM-K17 and in EUROMET 696. This comparison allows one to link the results obtained by LNE to the CCQM-K17 key comparison through the degree of equivalence of PTB. On the other hand, the discrepancy between measured pH values at the VNIIFTRI and PTB for the same type of buffer solution decreased, as compared with a bilateral comparison in 1997. Main text. To reach the main text of this paper, click on Final Report. The final report has been peer-reviewed and approved for publication by the CCQM, according to the provisions of the Mutual Recognition Arrangement (MRA).

  3. Ethical aspects of final disposal. Final report

    International Nuclear Information System (INIS)

    Baltes, B.; Leder, W.; Achenbach, G.B.; Spaemann, R.; Gerhardt, V.

    2003-01-01

    In fulfilment of this task the Federal Environmental Ministry has commissioned GRS to summarise the current national and international status of ethical aspects of the final disposal of radioactive wastes as part of the project titled ''Final disposal of radioactive wastes as seen from the viewpoint of ethical objectives''. The questions arising from the opinions, positions and publications presented in the report by GRS were to serve as a basis for an expert discussion or an interdisciplinary discussion forum for all concerned with the ethical aspects of an answerable approach to the final disposal of radioactive wastes. In April 2001 GRS held a one-day seminar at which leading ethicists and philosophers offered statements on the questions referred to above and joined in a discussion with experts on issues of final disposal. This report documents the questions that arose ahead of the workshop, the specialist lectures held there and a summary of the discussion results [de

  4. Beyond the desertification narrative: a framework for agricultural drought in semi-arid East Africa

    NARCIS (Netherlands)

    Slegers, M.F.W.; Stroosnijder, L.

    2008-01-01

    In the 20th century, much research was done on desertification. Desertification developed into a complex and vague construct that means land degradation under specific conditions. Projects focusing on land degradation in semiarid East Africa have met with limited success because farmers prioritize

  5. All projects related to uganda | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    2015-08-11

    Supporting business opportunities for rural women in east and southern Africa. Project. Women in Zimbabwe, Kenya, and Uganda experience disadvantages and gender inequalities in labour and ... Start Date: Tuesday, August 11, 2015.

  6. The East Midlands in 2006: the demography of the East Midlands

    OpenAIRE

    Lawton, C

    2006-01-01

    The East Midlands in 2006 is the evidence base that was produced to underpin the devleopment of the regional economic strategy, A Flourishing Region. This document presents detailed analysis of the demography of the East Midlands.

  7. W.A. Parish Post Combustion CO2 Capture and Sequestration Project Final Public Design Report

    Energy Technology Data Exchange (ETDEWEB)

    Armpriester, Anthony [Petra Nova Parish Holdings, Washington, DC (United States)

    2017-02-17

    The Petra Nova Project is a commercial scale post-combustion carbon dioxide capture project that is being developed by a joint venture between NRG Energy (NRG) and JX Nippon Oil and Gas Exploration (JX). The project is designed to separate and capture carbon dioxide from an existing coal-fired unit's flue gas slipstream at NRG's W.A. Parish Generation Station located southwest of Houston, Texas. The captured carbon dioxide will be transported by pipeline and injected into the West Ranch oil field to boost oil production. The project, which is partially funded by financial assistance from the U.S. Department of Energy will use Mitsubishi Heavy Industries of America, Inc.'s Kansai Mitsubishi Carbon Dioxide Recovery (KM-CDR(R)) advanced amine-based carbon dioxide absorption technology to treat and capture at least 90% of the carbon dioxide from a 240 megawatt equivalent flue gas slipstream off of Unit 8 at W.A. Parish. The project will capture approximately 5,000 tons of carbon dioxide per day or 1.5 million tons per year that Unit 8 would otherwise emit, representing the largest commercial scale deployment of post-combustion carbon dioxide capture at a coal power plant to date. The joint venture issued full notice to proceed in July 2014 and when complete, the project is expected to be the world's largest post-combustion carbon dioxide capture facility on an existing coal plant. The detailed engineering is sufficiently complete to prepare and issue the Final Public Design Report.

  8. UMTRA project: Canonsburg final design

    International Nuclear Information System (INIS)

    Thiers, G.R.; Guros, F.B.; Smith, E.S.

    1984-01-01

    Final design for on-site stabilization of over 300,000 cubic yards of abandoned mill tailings in Canonsburg, Pennsylvania, is being completed this Fall. This paper describes design criteria, design procedures, and difficulties encountered for the following required elements: 1. Encapsulation cell; 2. Durability of erosion protection material; 3. Flood control berm; 4. Sedimentation pond; 5. Wastewater treatment plant. The 70,000 cubic yards of the tailings for which radiation levels exceed 100 picocuries per gram will be placed on a 2-ft-thick compacted clay liner and encased by a 3-ft-thick compacted clay cover. The remaining tailings will be covered with at least two feet of clay to prevent radon escape and to reduce rainfall infiltration. Erosion protection will be provided for the encapsulation cell, the drainage swales, and from potential meandering of nearby Chartiers Creek

  9. Phipps Bend Nuclear Energy Project. Community impact assessment. Final report

    International Nuclear Information System (INIS)

    Snapp, P.C.; Teilhet, A.; Newsom, R.; Bond, M.; Garland, M.

    1977-01-01

    In late 1977, the Tennessee Valley Authority (TVA) proposed to build a 2 unit nuclear plant at Phipps Bend on the Holston River east of Surgoinsville, Tennessee. Total estimated cost is 1.6 billion dollars, with a generating capacity of 2,600,000 kilowatts. The facility will have an impact on Hawkins, Greene and Sullivan counties with 2,500 construction employees, a permanent work force of 300, increased availability of energy to stimulate new capital investment and the local government will need to deal with these. This report analyzed the facilities of each community in the impacted area and recommended certain action for infrastructure acquisition or improvements

  10. Isotopic composition of precipitation in the Mediterranean Basin in relation to air circulation patterns and climate. Final report of a coordinated research project 2000-2004

    International Nuclear Information System (INIS)

    2005-10-01

    The IAEA has operated the Global Network of Isotopes in Precipitation (GNIP) since 1961. There has been an increased need for GNIP data following the recognition of the role of precipitation stable isotopes in better simulating the hydrologic cycle in climate models. The isotopic composition of precipitation is closely related to rain formation conditions, i.e. with the temperature of formation, the origin of air masses, and the degree and mechanism of rainout. Over the last twenty years, use of GNIP data in climate model has indicated a need for a much more refined, process-based understanding of isotope variations in the hydrological cycle. This coordinated research project (CRP) was initiated with the aim of collecting new data on higher spatial density and temporal frequency to improve our knowledge of environmental isotope variations in atmospheric waters. The Mediterranean region was chosen for this study so that climatic and meteorological conditions, which govern the rain formation process, and their variations along east-west and north-south directions, could be investigated. In addition, the first steps of the hydrological cycle, that is evaporation from seawater and condensation of atmospheric vapour could also be studied. The IAEA invited scientists from institutes in Mediterranean countries who have already been involved in studies related to the isotopic composition of precipitation to take part in this CRP, which was initiated in 2000. This publication is a summary of the results achieved in the CRP. The overall achievements are presented as the executive summary, and the detailed findings are presented in each contribution. These results were presented in the final research coordination meeting, held in Vienna from 15 to 19 March 2004. The results of this CRP are relevant to the Member State scientists conducting hydrological research. In addition, the results would contribute to the IAEA programme on water resources, in particular to its activities

  11. Health risks of climate change in the World Health Organization South-East Asia Region.

    Science.gov (United States)

    Bowen, Kathryn J; Ebi, Kristie L

    2017-09-01

    Countries in the World Health Organization (WHO) South-East Asia Region are particularly vulnerable to a changing climate. Changes in extreme weather events, undernutrition and the spread of infectious diseases are projected to increase the number of deaths due to climate change by 2030, indicating the need to strengthen activities for adaptation and mitigation. With support from the WHO Regional Office for South-East Asia and others, countries have started to include climate change as a key consideration in their national public health policies. Further efforts are needed to develop evidence-based responses; garner the necessary support from partner ministries; and access funding for activities related to health and climate change. National action plans for climate change generally identify health as one of their priorities; however, limited information is available on implementation processes, including which ministries and departments would be involved; the time frame; stakeholder responsibilities; and how the projects would be financed. While progress is being made, efforts are needed to increase the capacity of health systems to manage the health risks of climate change in South-East Asia, if population health is to be protected and strengthened while addressing changing weather and climate patterns. Enhancing the resilience of health systems is key to ensuring a sustainable path to improved planetary and population health.

  12. Final Report: Bone Mass Inheritance: A Project to Identify the Genetic Regulation of Bone Mass; FINAL

    International Nuclear Information System (INIS)

    Recker, Robert R. M.D.

    2002-01-01

    This project was designed to find human chromosomal locations that contain genes regulating peak bone density. It is part of a whole genome search for those loci,each responsible for at least 15% of the variation in the peak adult bone density. We accomplished this with a sib pair design, combined with simultaneous examination of extended kindreds. This project gave partial support of the recruitment which has now been completed. The project will extend into 2003. During the remainder of the project, a whole genome scan will be performed from the entire cohort of 2226 persons who have DNA archived, followed by linkage analysis. This project will meet the scientific objective leading eventually to expanded options for treating the condition that leads to bone thinning osteoporosis, and potential fractures in aging populations

  13. Final audit report of remedial action construction at the UMTRA Project, Grand Junction, Colorado, processing site

    International Nuclear Information System (INIS)

    1995-02-01

    This final audit report (FAR) for remedial action at the Grand Junction, Colorado, Uranium Mill Tailings Remedial Action (UMTRA) Project processing site consists of a summary of the radiological surveillances/ audits, the quality assurance (QA) in-process surveillances, and the QA final close-out inspection performed by the US Department of Energy (DOE) and Technical Assistance Contractor (TAC). The FAR also summarizes other surveillances performed by the US Nuclear Regulatory Commission (NRC). To summarize, a total of one finding and 127 observations were noted during DOE/TAC audit and surveillance activities. The NRC noted general site-related observations during the OSCRs. Follow-up to responses required from MK-Ferguson for the DOE/TAC finding and observations indicated that all issues related to the Grand Junction processing site were resolved and closed out to the DOE's satisfaction. The NRC OSCRs resulted in no issues related to the Grand Junction processing site requiring a response from MK-Ferguson

  14. Final Report for Project DE-FG02-05ER15718 Fluoropolymers, Electrolytes, Composites and Electrodes

    Energy Technology Data Exchange (ETDEWEB)

    Creager, Stephen [Clemson Univ., SC (United States)

    2017-05-24

    This report is for a project that was initiated under the title “New Proton-Conducting Fluoropolymer Electrolytes for PEM Fuel Cells”, as part of the DOE program titled “Basic Research for the Hydrogen Fuel Cell Initiative”, Program Notice DE-FG01-04ER04-20. The project received 750,000 dollars in initial funding for a three-year term with a start date of August 15, 2005. Creager was PI and co-PIs were DesMarteau and Smith, all from Clemson. The project was renewed for a second three-year term with a start date of June 15 2008, again for 750,000 dollars, with the new title, “Fluoropolymers, Electrolytes, Composites and Electrodes”. Shortly after the renewal was put in place, co-PI Smith left Clemson to accept a position at the University of Texas at Dallas. After a period of no-cost extension the project was renewed on January 1 2013 for another three-year term, this time for a smaller amount ($525,000) and with Thrasher, a new senior hire at Clemson, as co-PI in place of Smith. DesMarteau had retired from Clemson by this time but was retained as a project advisor. After a final one-year no-cost extension for calendar year 2016, the project ended on December 31, 2016, giving it an active period of eleven and one-half years, from August 15 2005 to December 31 2016. The overall objective of this research project has been to create and understand the behavior of new fluoropolymer-based electrolytes and electrodes suitable for use in electrochemical energy storage and conversion devices. The objective was pursued via research on new fluorinated monomers, new polymers and polyelectrolytes (also known as ionomers), and new electrocatalyst supports that in some cases include chemically grafted electrolytes to promote rapid ion transport to electrocatalytically active sites (usually platinum nanoparticles) on the support. The research involved synthesis and characterization of new materials, and creation and use of new measurement techniques that address key

  15. All projects related to | Page 433 | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Mekong Economic Research Network (MERN). Project ... Region: Central Asia, Far East Asia, South Asia, Cambodia, Laos, Viet Nam. Program: ... Topic: TRADE NEGOTIATIONS, TRADE AGREEMENTS, REGIONAL INTEGRATION. Region: ...

  16. Hydrogen demonstration projects options in the Netherlands. Final report

    International Nuclear Information System (INIS)

    Bergsma, G.C.; Van der Werff, T.T.; Rooijers, F.J.

    1996-01-01

    Based on a survey of hydrogen demonstration projects, contacts with different actors and discussions in a sounding board for the study on the title subject, it is concluded that a conference can be organized where the possibilities of setting up hydrogen demonstration projects in the Netherlands can be discussed. The following projects offer good chances to be realized in the next few years: large-scale CO 2 storage in the underground, applying enhanced gas recovery. It appears to be a relatively cheap CO 2 emission reduction measure with a large potential. It can be combined with a hydrogen mixing project with the sale of hydrogen as a so-called eco-gas to consumers. There is little interest in the other options for CO 2 storage at coal gasification and the prompt supply of 100% H 2 to small-scale consumers. Hydrogen for cogeneration, fuel cells in the industry, hydrogen in road transport and hydrogen as a storage medium are projects in which some actors are interested. Hydrogen for air transport has a large potential to which only few parties in the Netherlands can anticipate. Hydrogen demonstration projects will show important surplus value when it is supported by a hydrogen research program. Such a program can be carried out in cooperation with several other programmes of the International Energy Agency, in Japan, Germany and a number of research programs of the Netherlands Agency for Energy and the Environment (Novem). 10 figs., 4 tabs., 33 refs

  17. Health promotion in South East Asia.

    Science.gov (United States)

    Mir, N S

    1998-01-01

    The countries of the South East Asia region, which includes Bangladesh, Bhutan, Pakistan, Korea, India, Indonesia, Maldives, Myanmar, Nepal, Sri Lanka, and Thailand, have undertaken a variety of strategies to address the health challenges in the region. The ever-growing pressure of population in the region has allowed rapid transmission of communicable diseases like malaria, tuberculosis (TB), leprosy, and HIV/AIDS. One of the innovative community-based health initiatives in response to this problem is Indonesia's Primary Health Care Project. This project aimed to develop a sustainable health infrastructure by training medical staff, coordinators, village cadres, midwives and those working for TB programs; provision of ongoing guidance and education in this area; and provision of medicines and funds. The project has pioneered a process towards positive changes. Another strategy is the collaboration of youth groups, island development committees, and health workers in Maldives which has led to the declaration of two islands (Madifushi and Haa Alif Berinmadhoo) as 'no smoking' islands. In addition, Sarvodaya has successfully developed a methodology to involve Buddhist monks in AIDS prevention and control through "the Buddhist approach to AIDS prevention in Sri Lanka."

  18. Willow Creek Wildlife Mitigation Project. Final environmental assessment

    International Nuclear Information System (INIS)

    1995-04-01

    Today's notice announces BPA's proposal to fund land acquisition or acquisition of a conservation easement and a wildlife management plan to protect and enhance wildlife habitat at the Willow Creek Natural Area in Eugene, Oregon. This action would provide partial mitigation for wildlife and wildlife habitat lost by the development of Federal hydroelectric projects in the Willamette River Basin. The project is consistent with BPA's obligations under provisions of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 as outlined by the Northwest Power Planning Council's 1994 Columbia River Basin Fish and Wildlife Program. BPA has prepared an environmental assessment (DOE/EA-1023) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement (EIS) is not required and BPA is issuing this FONSI

  19. Photovoltaic demonstration project. Final report

    International Nuclear Information System (INIS)

    Jicarilla Apache Tribe

    2002-01-01

    The Jicarilla Apache Nation is in Rio Arriba County in North Central New Mexico. The photovoltaic project was installed at the Dulce High School in the town of Dulce. Dulce is in the most northern part of the reservation near the New Mexico/Colorado boundary and can be reached from the New Mexico State Capitol in Santa Fe, hence to the town of Chama along U.S. Highway 84 to the junction of U.S. Highway 64. Dulce is about 12 miles west of the junction along U.S. Highway 64. Dulce community is in the mountainous part of the Nation with a population of about 4000. No industry exists in the community, however, a few commercial sites do exist such as a motel, restaurants, gas stations, food and liquor stores

  20. Final report: A Broad Research Project in the Sciences of Complexity; FINAL

    International Nuclear Information System (INIS)

    None

    2000-01-01

    Previous DOE support for ''A Broad Research Program in the Sciences of Complexity'' permitted the Santa Fe Institute to initiate new collaborative research within its Integrative Core activities as well as to host visitors to participate in research on specific topics that serve as motivation and testing-ground for the study of general principles of complex systems. The critical aspect of this support is its effectiveness in seeding new areas of research. Indeed, this Integrative Core has been the birthplace of dozens of projects that later became more specifically focused and then won direct grant support independent of the core grants. But at early stages most of this multidisciplinary research was unable to win grant support as individual projects-both because it did not match well with existing grant program guidelines, and because the amount of handing needed was often too modest to justify a formal proposal to an agency. In fact, one of the attributes of core support has been that it permitted SFI to encourage high-risk activities because the cost was quite low. What is significant is how many of those initial efforts have been productive in the SFI environment. Many of SFI'S current research foci began with a short visit from a researcher new to the SFI community, or as small working groups that brought together carefully selected experts from a variety of fields. As mentioned above, many of the ensuing research projects are now being supported by other funding agencies or private foundations. Some of these successes are described

  1. Relevance of East African Drill Cores to Human Evolution: the Case of the Olorgesailie Drilling Project

    Science.gov (United States)

    Potts, R.

    2016-12-01

    Drill cores reaching the local basement of the East African Rift were obtained in 2012 south of the Olorgesailie Basin, Kenya, 20 km from excavations that document key benchmarks in the origin of Homo sapiens. Sediments totaling 216 m were obtained from two drilling locations representing the past 1 million years. The cores were acquired to build a detailed environmental record spatially associated with the transition from Acheulean to Middle Stone Age technology and extensive turnover in mammalian species. The project seeks precise tests of how climate dynamics and tectonic events were linked with these transitions. Core lithology (A.K. Behrensmeyer), geochronology (A. Deino), diatoms (R.B. Owen), phytoliths (R. Kinyanjui), geochemistry (N. Rabideaux, D. Deocampo), among other indicators, show evidence of strong environmental variability in agreement with predicted high-eccentricity modulation of climate during the evolutionary transitions. Increase in hominin mobility, elaboration of symbolic behavior, and concurrent turnover in mammalian species indicating heightened adaptability to unpredictable ecosystems, point to a direct link between the evolutionary transitions and the landscape dynamics reflected in the Olorgesailie drill cores. For paleoanthropologists and Earth scientists, any link between evolutionary transitions and environmental dynamics requires robust evolutionary datasets pertinent to how selection, extinction, population divergence, and other evolutionary processes were impacted by the dynamics uncovered in drill core studies. Fossil and archeological data offer a rich source of data and of robust environment-evolution explanations that must be integrated into efforts by Earth scientists who seek to examine high-resolution climate records of human evolution. Paleoanthropological examples will illustrate the opportunities that exist for connecting evolutionary benchmarks to the data obtained from drilled African muds. Project members: R. Potts, A

  2. Pb and Sr isotopic systematics of some basalts and sulfides from the East Pacific Rise at 210N (project RITA)

    International Nuclear Information System (INIS)

    Vidal, P.; Clauer, N.

    1981-01-01

    Tholeiitic basalts and sulfide deposits from the 'Cyana' and 'Alvin' diving programs (RITA project) on the East Pacific Rise were analyzed for Pb and Sr isotopes. The basalt data plot within the field defined previously by other East Pacific Rise basalts ( 206 Pb/ 204 Pb: 18.35-18.58; 207 Pb/ 204 Pb: 15.48-15.53; 208 Pb/ 204 Pb: 37.8-38.1; 87 Sr/ 86 Sr: 0.7022-0.7025). Pb, U and Sr contents (approx. equal to 0.5, approx. equal to 0.05 and approx. equal to 110 ppm, respectively) and μ values (approx. equal to 6) are typical of MORB, whereas Th/U ratios (approx. equal to 3.5) are significantly higher. The Pb isotopic ratios of the sulfide samples are very homogeneous ( 206 Pb/ 204 Pb approx. equal to 18.47, 207 Pb/ 204 Pb approx. equal to 15.49, 208 Pb/ 204 Pb approx. equal to 37.90), and plot in the middle of the basalt field. This indicates that the sulfide Pb was derived from the basaltic crust without any significant contribution from either seawater or hemipelagic sediments, and the solutions from which the sulfiedes were deposited had uniform Pb isotopic composition. The Pb contents of three sulfide samples is relatively high (170-1310 ppm). The Sr contents of five sulfide samples are widely scattered from 12 to 210 ppm, with 87 Sr/ 86 Sr ratios intermediate between basaltic and seawater values (0.70554 +- 0.00005 to 0.70795 +- 0.00011). Leaching experiments show that both basalt-derived Sr and seawater Sr were present in the solutions which deposited the sulfides. In some cases, Sr was also adsorbed from seawater onto the sulfides following their deposition. Basalt-derived Sr and seawater Sr are also present in associated non-sulfide phases. (orig.)

  3. Project Guarantee 1985. Radioactive wastes: Properties and allocation to final repository types

    International Nuclear Information System (INIS)

    Anon.

    1985-01-01

    An overview of waste-specific data, as input into constructional engineering studies and safety analyses of Project Guarantee, is presented which describes the activity inventory of the radioactive waste to be disposed of, classified according to origin, the quantitative spezifications of the waste, the concept of classifying waste into appropriate categories, grouping into major categories and distribution of these between the different repository types, and finally, control measures which ensure observance of the specifications of the waste to be disposed of. It is expedient, for conceptional considerations and for the operational phase of the repository, to split the waste up into several suitably specified waste categories according to the practical aspects of origin and conditioning. This can be done in such a way that the waste within a specific category is sufficiently homogeneous with regard to its radiological properties and chemical composition for the requirements of safety analysis. The present volume contains base-data for around 30 waste types. Two waste types are documented with more detailed data as an example of the practicability of the comprehensive waste characterisation contained in reference report NTB 84-47. It is shown that waste-specific data which go into safety analysis and constructional engineering project studies are available in an appropriate degree of detail. The method of distributing the waste between repositories with differing degrees of protection and procedures for controlling adherence to admission specifications are developed and documented. It can be ensured that no waste with an impermissibly high radiotoxicity level will later be emplaced in a repository for low- and intermediate-level waste

  4. Expedited technology demonstration project (Revised mixed waste management facility project) Project baseline revision 4.0 and FY98 plan

    International Nuclear Information System (INIS)

    Adamson, M. G.

    1997-01-01

    The re-baseline of the Expedited Technology Demonstration Project (Revised Mixed Waste Facility Project) is designated as Project Baseline Revision 4.0. The last approved baseline was identified as Project Baseline Revision 3.0 and was issued in October 1996. Project Baseline Revision 4.0 does not depart from the formal DOE guidance followed by, and contained in, Revision 3.0. This revised baseline document describes the MSO and Final Forms testing activities that will occur during FY98, the final year of the ETD Project. The cost estimate for work during FY98 continues to be $2.OM as published in Revision 3.0. However, the funds will be all CENRTC rather than the OPEX/CENTRC split previously anticipated. LLNL has waived overhead charges on ETD Project CENRTC funds since the beginning of project activities. By requesting the $2.OM as all CENTRC a more aggressive approach to staffing and testing can be taken. Due to a cost under- run condition during FY97 procurements were made and work was accomplished, with the knowledge of DOE, in the Feed Preparation and Final Forms areas that were not in the scope of Revision 3.0. Feed preparation activities for FY98 have been expanded to include the drum opening station/enclosure previously deleted

  5. Hellsgate Winter Range Mitigation Project; Long-term Management Plan, Project Report 1993, Final Draft.

    Energy Technology Data Exchange (ETDEWEB)

    Berger, Matthew T.

    1994-01-01

    A study was conducted on the Hellsgate Winter Range Mitigation Project area, a 4,943 acre ranch purchased for mitigating some habitat losses associated with the original construction of Grand Coulee Dam and innundation of habitat by Lake Roosevelt. A Habitat Evaluation Procedure (HEP) study was used to determine habitat quality and quantity baseline data and future projections. Target species used in the study were sharp-tailed grouse (Tympanuchus phasianellus), mule deer (Odocoileus hemoinus), mink (Mustela vison), spotted sandpiper (Actiius colchicus), bobcat (Felis reufs), blue grouse (Dendragapus obscurus), and mourning dove (Zenaida macroura). From field data collected, limiting life values or HSI's (Habitat Suitability Index's) for each indicator species was determined for existing habitats on project lands. From this data a long term management plan was developed. This report is designed to provide guidance for the management of project lands in relation to the habitat cover types discussed and the indicator species used to evaluate these cover types. In addition, the plan discusses management actions, habitat enhancements, and tools that will be used to enhance, protect and restore habitats to desired conditions. Through planned management actions biodiversity and vegetative structure can be optimized over time to reduce or eliminate, limiting HSI values for selected wildlife on project lands.

  6. Final programmatic environmental impact statement for the uranium mill tailings remedial action ground water project. Volume I

    Energy Technology Data Exchange (ETDEWEB)

    None

    1996-10-01

    This programmatic environmental impact statement (PElS) was prepared for the Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project to comply with the National Environmental Policy Act (NEPA). This PElS provides an analysis of the potential impacts of the alternatives and ground water compliance strategies as well as potential cumulative impacts. On November 8, 1978, Congress enacted the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law, codified at 42 USC §7901 et seq. Congress found that uranium mill tailings " ... may pose a potential and significant radiation health hazard to the public, and that every reasonable effort should be made to provide for stabilization, disposal, and control in a safe, and environmentally sound manner of such tailings in order to prevent or minimize other environmental hazards from such tailings." Congress authorized the Secretary of Energy to designate inactive uranium processing sites for remedial action by the U.S. Department of Energy (DOE). Congress also directed the U.S. Environmental Protection Agency (EPA) to set the standards to be followed by the DOE for this process of stabilization, disposal, and control. On January 5, 1983, EPA published standards (40 CFR Part 192) for the disposal and cleanup of residual radioactive materials. On September 3, 1985, the U.S. Court of Appeals for the Tenth Circuit set aside and remanded to EPA the ground water provisions of the standards. The EPA proposed new standards to replace remanded sections and changed other sections of 40 CFR Part 192. These proposed standards were published in the Federal Register on September 24, 1987 (52 FR 36000). Section 108 of the UMTRCA requires that DOE comply with EPA's proposed standards in the absence of final standards. The Ground Water Project was planned under the proposed standards. On January 11, 1995, EPA published the final rule, with which the DOE must now comply. The PElS and the Ground Water Project are

  7. Final programmatic environmental impact statement for the uranium mill tailings remedial action ground water project. Volume I

    International Nuclear Information System (INIS)

    1996-01-01

    This programmatic environmental impact statement (PElS) was prepared for the Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project to comply with the National Environmental Policy Act (NEPA). This PElS provides an analysis of the potential impacts of the alternatives and ground water compliance strategies as well as potential cumulative impacts. On November 8, 1978, Congress enacted the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law, codified at 42 USC §7901 et seq. Congress found that uranium mill tailings ' ... may pose a potential and significant radiation health hazard to the public, and that every reasonable effort should be made to provide for stabilization, disposal, and control in a safe, and environmentally sound manner of such tailings in order to prevent or minimize other environmental hazards from such tailings.' Congress authorized the Secretary of Energy to designate inactive uranium processing sites for remedial action by the U.S. Department of Energy (DOE). Congress also directed the U.S. Environmental Protection Agency (EPA) to set the standards to be followed by the DOE for this process of stabilization, disposal, and control. On January 5, 1983, EPA published standards (40 CFR Part 192) for the disposal and cleanup of residual radioactive materials. On September 3, 1985, the U.S. Court of Appeals for the Tenth Circuit set aside and remanded to EPA the ground water provisions of the standards. The EPA proposed new standards to replace remanded sections and changed other sections of 40 CFR Part 192. These proposed standards were published in the Federal Register on September 24, 1987 (52 FR 36000). Section 108 of the UMTRCA requires that DOE comply with EPA's proposed standards in the absence of final standards. The Ground Water Project was planned under the proposed standards. On January 11, 1995, EPA published the final rule, with which the DOE must now comply. The PElS and the Ground Water Project are in

  8. Final Report

    DEFF Research Database (Denmark)

    Heiselberg, Per; Brohus, Henrik; Nielsen, Peter V.

    This final report for the Hybrid Ventilation Centre at Aalborg University describes the activities and research achievement in the project period from August 2001 to August 2006. The report summarises the work performed and the results achieved with reference to articles and reports published...

  9. Final Report on Pilot Studies / Final Report on Classroom Research with STEM and TESL Assessment

    DEFF Research Database (Denmark)

    Biel, Carmen; Wake, Jo Dugstad; Hesse, Friedrich

    This Deliverable is the final report on pilot studies within the NEXT-TELL project (D6.7) and furthermore comprises the Deliverable on Classroom Research with STEM and TESL Assessment (D2.9) in order to avoid redundancies between those two Deliverables.......This Deliverable is the final report on pilot studies within the NEXT-TELL project (D6.7) and furthermore comprises the Deliverable on Classroom Research with STEM and TESL Assessment (D2.9) in order to avoid redundancies between those two Deliverables....

  10. Austin Children`s Museum ``Go Power`` project. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1993-10-01

    Go Power, was conceived as an interactive exhibit and related set of activities designed to promote in children and families an understanding and appreciation of energy concepts. Planned in 1990, the project culminated its first phase of activities with colorful, interactive exhibit about the pathways and transformations of energy, on display at the Austin Children`s Museum between February 5th and June 6th, 1993. The project was supported by the US Department of Energy, the National Science Foundation, the Lower Colorado River Authority and various local foundations and businesses. This report describes the process, product and outcomes of this project.

  11. Persistent organic pollutants, skull size and bone density of polar bears (Ursus maritimus) from East Greenland 1892–2015 and Svalbard 1964–2004

    DEFF Research Database (Denmark)

    Daugaard-Petersen, Tobias; Langebæk, Rikke; Rigét, Frank F.

    2018-01-01

    that the skull size of adult East Greenland females was negatively correlated with collection year 1892–2015 (linear regression: p = 0.06). No temporal change was found for BMD or skull size in Svalbard polar bears (ANOVA: all p > 0.05) nor was there any significant difference in BMD between Svalbard and East...... Greenland subpopulations. Skull size was larger in polar bears from Svalbard than from East Greenland (two-way ANOVA: p = 0.003). T-scores reflecting risk of osteoporosis showed that adult males from both East Greenland and Svalbard are at risk of developing osteopenia. Finally, when correcting for age...

  12. Final Treatment Center Project for Liquid and Wet Radioactive Waste in Slovakia

    International Nuclear Information System (INIS)

    Kravarik, K.; Stubna, M.; Pekar, A.; Krajc, T.; Zatkulak, M.; Holicka, Z.; Slezak, M.

    2006-01-01

    The Final Treatment Center (FTC) for Mochovce nuclear power plant (NPP) is designed for treatment and final conditioning of radioactive liquid and wet waste produced from plant operation. Mochovce NNP uses a Russian VVER-440 type reactor. Treated wastes comprise radioactive concentrates, spent resin and sludge. VUJE Inc. as an experienced company in field of treatment of radioactive waste in Slovakia has been chosen as main contractor for technological part of FTC. This paper describes the capacity, flow chart, overall waste flow and parameters of the main components in the FTC. The initial project was submitted for approval to the Slovak Electric plc. in 2003. The design and manufacture of main components were performed in 2004 and 2005. FTC construction work started early in 2004. Initial non-radioactive testing of the system is planned for summer 2006 and then radioactive tests are to be followed. A one-year trial operation of facility is planned for completion in 2007. SE - VYZ will be operates the FTC during trial operation and after its completion. SE - VYZ is subsidiary company of Slovak Electric plc. and it is responsible for treatment with radioactive waste and spent fuel in the Slovak republic. SE - VYZ has, besides of other significant experience with operation of Jaslovske Bohunice Treatment Centre. The overall capacity of the FTC is 870 m 3 /year of concentrates and 40 m 3 /year of spent resin and sludge. Bituminization and cementation were provided as main technologies for treatment of these wastes. Treatment of concentrate is performed by bituminization. Concentrate and bitumen are metered into a thin film evaporator with rotating wiping blades. Surplus water is evaporated and concentrate salts are embedded in bitumen. Bitumen product is discharged into 200 l steel drums. Spent resin and sludge are decanted, dried and mixed with bitumen. These mixtures are also discharged into 200 l steel drums. Drums are moved along bituminization line on a roller

  13. Fairbanks Geothermal Energy Project Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Karl, Bernie [CHSR,LLC Owner

    2013-05-31

    The primary objective for the Fairbanks Geothermal Energy Project is to provide another source of base-load renewable energy in the Fairbanks North Star Borough (FNSB). To accomplish this, Chena Hot Springs Resort (Chena) drilled a re-injection well to 2700 feet and a production well to 2500 feet. The re-injection well allows a greater flow of water to directly replace the water removed from the warmest fractures in the geothermal reservoir. The new production will provide access to warmer temperature water in greater quantities.

  14. Willow Creek Wildlife Mitigation Project. Final Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-01

    Today`s notice announces BPA`s proposal to fund land acquisition or acquisition of a conservation easement and a wildlife management plan to protect and enhance wildlife habitat at the Willow Creek Natural Area in Eugene, Oregon. This action would provide partial mitigation for wildlife and wildlife habitat lost by the development of Federal hydroelectric projects in the Willamette River Basin. The project is consistent with BPA`s obligations under provisions of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 as outlined by the Northwest Power Planning Council`s 1994 Columbia River Basin Fish and Wildlife Program. BPA has prepared an environmental assessment (DOE/EA-1023) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement (EIS) is not required and BPA is issuing this FONSI.

  15. A policy proposal for the introduction of solar home systems in East Timor

    Energy Technology Data Exchange (ETDEWEB)

    Bond, M.; Fuller, R.J.; Aye, Lu [The University of Melbourne, Victoria (AU). Department of Civil and Environmental Engineering, International Technologies Centre (IDTC)

    2007-12-15

    The Government of East Timor aims to increase the rate of household electricity service from 20% to 80% over the next 20 years. With a largely rural population living in sparsely populated, remote locations, solar home systems (SHS) will play an important role in meeting the off-grid component of rural electrification in East Timor. This paper describes current experience and trials in East Timor with solar photovoltaic (PV) technology. It examines the East Timorese context against six 'key features' identified by the World Bank as typically included in solar PV projects: delivery infrastructure; access to finance; rural electrification policy; guarantees for minimum quality; understanding of customer needs; and scaling up capacity building. Of these issues, the authors contend that selection of the delivery infrastructure model is the most critical decision, and that for East Timor, in its present stage of development, a market-driven approach for SHS is unlikely to be successful. A model which subsidises capital costs but seeks full recovery of operating costs is recommended. Irrespective of the delivery infrastructure model, for sustainability, capacity must be developed in a range of other areas, particularly the commercial availability of high-quality components and spare parts; creation of a pool of skilled technicians for installation and maintenance; and development of a robust fee collection and maintenance infrastructure. (author)

  16. A policy proposal for the introduction of solar home systems in East Timor

    International Nuclear Information System (INIS)

    Bond, M.; Fuller, R.J.; Aye, Lu

    2007-01-01

    The Government of East Timor aims to increase the rate of household electricity service from 20% to 80% over the next 20 years. With a largely rural population living in sparsely populated, remote locations, solar home systems (SHS) will play an important role in meeting the off-grid component of rural electrification in East Timor. This paper describes current experience and trials in East Timor with solar photovoltaic (PV) technology. It examines the East Timorese context against six 'key features' identified by the World Bank as typically included in solar PV projects: delivery infrastructure; access to finance; rural electrification policy; guarantees for minimum quality; understanding of customer needs; and scaling up capacity building. Of these issues, the authors contend that selection of the delivery infrastructure model is the most critical decision, and that for East Timor, in its present stage of development, a market-driven approach for SHS is unlikely to be successful. A model which subsidises capital costs but seeks full recovery of operating costs is recommended. Irrespective of the delivery infrastructure model, for sustainability, capacity must be developed in a range of other areas, particularly the commercial availability of high-quality components and spare parts; creation of a pool of skilled technicians for installation and maintenance; and development of a robust fee collection and maintenance infrastructure

  17. All projects related to | Page 69 | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Supporting Healthier Food Policies in Southeast Asia ... This project will help prepare youth in East and Southern Africa for economic opportunities, and ... Topic: Poverty alleviation, WOMEN, PRIVATE SECTOR, LATIN AMERICA, FINANCIAL ...

  18. All projects related to | Page 68 | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Supporting Healthier Food Policies in Southeast Asia ... This project will help prepare youth in East and Southern Africa for economic opportunities, and ... Topic: Poverty alleviation, WOMEN, PRIVATE SECTOR, LATIN AMERICA, FINANCIAL ...

  19. Lower Columbia River Terminal Fisheries Research Project : Final Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-04-01

    This notice announces BPA`S`s decision to fund the Oregon Department of Fish and Wildlife (ODFW), the Washington Department of Fish and Wildlife (WDFW), and the Clatsop Economic Development Committee for the Lower Columbia River Terminal Fisheries Research Project (Project). The Project will continue the testing of various species/stocks, rearing regimes, and harvest options for terminal fisheries, as a means to increase lower river sport and commercial harvest of hatchery fish, while providing both greater protection of weaker wild stocks and increasing the return of upriver salmon runs to potential Zone 6 Treaty fisheries. The Project involves relocating hatchery smolts to new, additional pen locations in three bays/sloughs in the lower Columbia River along both the Oregon and Washington sides. The sites are Blind Slough and Tongue Point in Clatsop County, Oregon, and Grays Bay/Deep River, Wahkiakum County, Washington. The smolts will be acclimated for various lengths of time in the net pens and released from these sites. The Project will expand upon an existing terminal fisheries project in Youngs Bay, Oregon. The Project may be expanded to other sites in the future, depending on the results of this initial expansion. BPA`S has determined the project is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement is not required, and BPA`S is issuing this FONSI.

  20. Project Familia. Final Evaluation Report, 1992-93. OREA Report.

    Science.gov (United States)

    Clarke, Candice

    Project Familia was an Elementary and Secondary Education Act Title VII funded project that, in the year covered by this evaluation, served 41 special education students of limited English proficiency (LEP) from 5 schools, with the participation of 54 parents and 33 siblings. Participating students received English language enrichment and…

  1. 75 FR 78986 - East Cheyenne Gas Storage, LLC; Notice of Intent To Prepare an Environmental Assessment for the...

    Science.gov (United States)

    2010-12-17

    ..., East Cheyenne planned to do enhanced oil recovery (EOR) of petroleum reserves remaining in the storage... proposed project amendment under these general headings: Geology and soils; Land use; Water resources...

  2. Bear Creek Project. Final environmental statement

    International Nuclear Information System (INIS)

    1977-06-01

    The Bear Creek Project consists of certain mining and milling operations involving uranium ore deposits located in Converse County, Wyoming. Mining of uranium from nine known ore bodies will take place over a period of ten years (estimated); a mill with a nominal capacity of 1000 tons per day of ore will be constructed and operated as long as ore is available. The waste material (tailings) from the mill, also produced at a rate of about 1000 tons per day, will be stored onsite in an impoundment. Environmental impacts and adverse effects are summarized

  3. Precipitation Characteristics in West and East Africa from Satellite and in Situ Observations

    Science.gov (United States)

    Dezfuli, Amin K.; Ichoku, Charles M.; Mohr, Karen I.; Huffman, George J.

    2017-01-01

    Using in situ data, three precipitation classes are identified for rainy seasons of West and East Africa: weak convective rainfall (WCR), strong convective rainfall (SCR), and mesoscale convective systems (MCSs).Nearly 75% of the total seasonal precipitation is produced by the SCR and MCSs, even though they represent only 8% of the rain events. Rain events in East Africa tend to have a longer duration and lower intensity than in West Africa, reflecting different characteristics of the SCR and MCS events in these two regions. Surface heating seems to be the primary convection trigger for the SCR, particularly in East Africa, whereas the WCR requires a dynamical trigger such as low-level convergence. The data are used to evaluate the performance of the recently launched Integrated Multi-satellite Retrievals for Global Precipitation Measurement (IMERG)project. The IMERG-based precipitation shows significant improvement over its predecessor, the Tropical Rainfall Measuring Mission (TRMM) Multi-satellite Precipitation Analysis (TMPA), particularly in capturing the MCSs, due to its improved temporal resolution.

  4. Danish-Czech wind resource know-how transfer project. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Rathmann, O.; Noergaerd, P.; Frandsen, S.

    2004-06-01

    The course of the Danish-Czech Wind Resource Know-how Transfer Project is reported. The know-how transfer component of the project has consisted in performing a wind resource training work-shop for about 13 individuals from the Czech Republic, ranging from scientists to wind farm project developers, and in donating modern software for evaluating wind resources. The project has also included a review of a Czech overview-study of wind speeds inside the country as well as an investigation of the electricity tariffs and their impact on wind energy utilization in the Czech Republic. A problematic existing Czech wind farm project, locked up in a no-production situation, was also addressed. Not until the purchase by a new owner-company, which initiated the necessary repair and maintenance, the wind farm resumed normal operation. As its last task, the present project assisted in consolidating future operation through a helping package consisting of a training course for the wind farm technicians and in a package of relevant spare parts. (au)

  5. Final report of the inter institutional project ININ-CNSNS 'Source Terms specific for the CNLV'

    International Nuclear Information System (INIS)

    Anaya M, R.A.

    1991-02-01

    The purpose of the project inter institutional ININ-CNSNS 'Source Terms Specifies for the CNLV' it is the one of implanting in the computer CYBER (CDC 180-830) of the ININ, the 'Source Term Code Package' (STCP) and to make the operation tests and corresponding operation using the data of the sample problem, for finally to liberate the package, all time that by means of the analysis of the results it is consider appropriate. In this report the results of the are presented simulation of the sequence 'Energy Losses external' (Station blackout) and 'Lost total of CA with failure of the RCIC and success of the HPCS' both with data of the Laguna Verde Central. (Author)

  6. Development and characterization of semiconductor materials by ion beams. Final report of a co-ordinated research project

    International Nuclear Information System (INIS)

    2002-06-01

    This CRP was recommended by the Consultants meeting on Ion Beam Techniques Applied to Semiconductor and Related Advanced Materials, held in April 1997 in Vienna. The consultants proposed to have a CRP in the field of application of MeV ion beams for the development and characterization of semiconductor materials. The CRP was approved and a first RCM was held in Vienna between 2-5 June 1998, in order to stimulate ideas and to promote collaborations among CRP participants. The goals and practical outcomes of the CRP were defined and several specific topics were identified including: optoelectronic characterization of semiconductor materials and devices by ion microbeams, characterization of thin films, defect transformations in semiconductors, light element analysis. One important recommendation was that sample exchanges among different laboratories be strongly encouraged. The participants presented individual activities on their projects, all subjects of research were identified and linked with approved individual projects. Collaboration among the participants was discussed and established. Some modifications to work plans were adopted. As proposed during the first RCM, the final RCM was held at the Ruder Boskovic Institute, Zagreb, Croatia, between 25 and 29 September 2000, with the purpose of reviewing/discussing the results achieved during the course of the CRP and to prepare a draft of the final report and associated publication. This document contains summary of the CRP and ten individual reports presented by participants. Each of the reports has been indexed separately

  7. All projects related to | Page 132 | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    This project will analyze three state institutions in Tunisia, Egypt, and Yemen - the ... state-controlled religious institutions, and state-owned media - to assess the ... POLICY MAKING, MIDDLE EAST, Civil society, SOCIAL DEVELOPMENT.

  8. All projects related to Tunisia | Page 2 | IDRC - International ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    This project will analyze three state institutions in Tunisia, Egypt, and Yemen - the ... state-controlled religious institutions, and state-owned media - to assess the ... POLICY MAKING, MIDDLE EAST, Civil society, SOCIAL DEVELOPMENT.

  9. The Impact of Head Start on Children, Families and Communities. Final Report of the Head Start Evaluation, Synthesis and Utilization Project.

    Science.gov (United States)

    McKey, Ruth Hubbell; And Others

    Including all Head Start research (both published and unpublished) and using, when possible, the statistical technique of meta-analysis, this final report of the Head Start Evaluation, Synthesis, and Utilization Project presents findings on the impact of Head Start on children's cognitive and socioemotional development, on child health and health…

  10. Rural Math Excel Partnership (RMEP) Project Final Performance Report

    Science.gov (United States)

    Harmon, Hobart; Tate, Veronica; Stevens, Jennifer; Wilborn, Sandy; Adams, Sue

    2018-01-01

    The goal of the Rural Math Excel Partnership (RMEP) project, a development project funded by the U.S. Department of Education Investing in Innovation (i3) grant program, was to develop a model of shared responsibility among families, teachers, and communities in rural areas as collective support for student success in and preparation for advanced…

  11. An observational study of acarbose treatment in patients with type 2 diabetes from the Middle East and Morocco

    Directory of Open Access Journals (Sweden)

    Shihabi AR

    2013-04-01

    Full Text Available Abdul R Shihabi,1 Essam M Moussa,2 Hania Sobierajska,3 Birgit Schmidt4 1Al Ain Centre, Dubai, United Arab Emirates; 2New Jeddah Hospital, Jeddah, Saudi Arabia; 3Etihad Airways Medical Centre, Abu Dhabi, United Arab Emirates; 4Bayer Schering Pharma AG, Leverkusen, Germany Background: The prevalence of type 2 diabetes is increasing dramatically in the Middle East and North Africa region. However, there are few trials that have determined the effect of antidiabetic treatment in an observational setting in these countries. Methods: This was a noninterventional study performed in Morocco in 2006–2007 and in the Middle East in 2005–2006 to observe the efficacy and safety of acarbose in patients with pretreated or untreated type 2 diabetes. Glycemic parameters (fasting blood glucose, one-hour postprandial blood glucose, and HbA1c were recorded within a 3-month period. The observation period included an initial visit at the start of acarbose therapy and up to three follow-ups. Results: Acarbose was effective in reducing glycemic parameters in patients from Morocco (n = 1082 and the Middle East (n = 1737. The mean one-hour postprandial blood glucose decreased by 35.5% to 165.4 ± 47.9 mg/dL in the Middle East and by 35.5% to 179.0 ± 49.9 mg/dL in Morocco. Mean fasting blood glucose decreased by 30.8% to 126.6 ± 34.2 mg/dL (Middle East and by 34.5% to 150.6 ± 47.1 mg/dL (Morocco. The absolute reduction in HbA1c was 1.3% in the Middle East (final value 7.4% and 1.0% in Morocco (final value 7.5%. Overall, 107 patients (Middle East and 26 patients (Morocco experienced minor drug-related adverse events, which were mainly gastrointestinal. The tolerability of acarbose was rated as very good/good by 80.8% in the Middle East and by 68.6% in Morocco. Conclusion: This study illustrates the efficacy and safety of acarbose in the treatment of type 2 diabetic patients in an observational setting. Keywords: type 2 diabetes, acarbose, Glucobay®, Glucor

  12. Project financing

    International Nuclear Information System (INIS)

    Alvarez, M.U.

    1990-01-01

    This paper presents the basic concepts and components of the project financing of large industrial facilities. Diagrams of a simple partnership structure and a simple leveraged lease structure are included. Finally, a Hypothetical Project is described with basic issues identified for discussion purposes. The topics of the paper include non-recourse financing, principal advantages and objectives, disadvantages, project financing participants and agreements, feasibility studies, organization of the project company, principal agreements in a project financing, insurance, and an examination of a hypothetical project

  13. The loading of waters from forestry, final report of the MESUVE -project; Metsaetalouden vesistoekuormitus. MESUVE{sub p}rojektin loppuraportti

    Energy Technology Data Exchange (ETDEWEB)

    Kenttaemies, K.; Mattsson, T. (eds.)

    2006-07-01

    The joint research project entitled 'Developing the integrated forestry planning with water protection using GIS-oriented erosion sensitivity modeling' (MESUVE) which was funded by the Ministry of Agriculture and Forestry and the Ministry of the Environment in 2003-2005. The partners in the project were the Finnish Environment Institute (SYKE), the Forest Research Institute, the Forestry Development Centre Tapio, the National Board of Forestry and the Geological Survey of Finland. The project was headed by Kaarle Kenttaemies, limnologist (SYKE), and the steering group was chaired by Marja Hilska-Aaltonen, Senior Adviser, Ministry of Agriculture and Forestry. In addition to several articles on proper forestry planning (establishing the research catchments, developing a soil survey for forestry and using geological soil maps, adapting a processoriented SWAT model for erosion studies in forestry), this final report includes papers on subprojects dealing with calculation methods and restriction strategies of forestry loading, the issues of the importance of implementing the water protection framework programme in EU-countries. These reports include the river basin scale calculations of nutrient loads from forestry and scenarios for the future, new reports on nutrient loads from clear cutting and mitigation drainage of forests that include data from seven new forest catchments, the long term monitoring results of clear cutting and forest drainage and results of comprehensive data from nutrient loads from mitigation drainage. The effectiveness of organic soils in adsorbing phosphates on buffer zones and the use of phosphates from forested catchments for algae growth are also presented in this final report. (orig.)

  14. The Early Ordovician trilobite distribution and zonation of the East Baltic

    Directory of Open Access Journals (Sweden)

    Pärnaste, Helje

    2006-06-01

    Full Text Available Biozones of the East Baltic Early Ordovician trilobites were studied based on the trilobite distribution in northwestern Russia, Estonia, and Sweden. New data on trilobite distribution reveal the diachroneity of the lowest calcareous sediments of the Mäeküla Member, which forms the upper part of the Leetse Formation in the East Baltic. Trilobites of the Tremadoc Apatokephalus serratus and Megistaspis (Ekeraspis armata biozones are missing in the East Baltic, in contradiction to the suggestion of Balashova (Vopr. Paleontol., 1966, 5, 3–22. Some poorly preserved specimens probably belonging to Megistaspis (Paramegistaspis planilimbata (Angelin and also records of Pliomerops? linnarssoni (Wiman indicate that the Arenig Megistaspis (P. planilimbata Biozone of the Hunneberg Stage may be represented in some localities. The final delimitation of biozones in the Mäeküla and Päite members should improve when the ontogenetic and phylogenetic variation of the M. (Paramegistaspis lineage has been fully documented. Until then the Evropeites lamanskii Biozone is used in the East Baltic following Balashova, as indicated by the appearance of that taxon in most studied localities, marking the beginning of the Billingen Age. The succeeding Megalaspides (Megalaspides dalecarlicus Biozone is represented by the occurrence of at least its upper part in the Vassilkovo Beds in the St. Petersburg region, where Megalaspides paliformis Tjernvik occurs together with the index taxon (these taxa co-occur in the upper part of this zone in Sweden. The Päite Member in the East Baltic is correlated with the Megistaspis (P. estonica Biozone of the upper part of the Billingen Stage in Sweden.

  15. Conceptual design of EAST flexible in-vessel inspection system

    International Nuclear Information System (INIS)

    Peng, X.B.; Song, Y.T.; Li, C.C.; Lei, M.Z.; Li, G.

    2010-01-01

    Remote handling technology, especially the flexible in-vessel inspection system (FIVIS) without breaking the working condition of the vacuum vessel, has been identified as one major challenge on the maintenance for the future tokamak fusion reactor. The FIVIS introduced here is specially developed for EAST superconducting tokamak that has actively cooled plasma facing components (PFCs). It aims flexible close-up inspection of EAST PFCs to help the understanding of operation issues that could occur in the vacuum vessel. This paper resumes the preliminary work of the FIVIS project, including the requirement analysis and the development of the conceptual design. The FIVIS consists out of a long reach multi-articulated manipulator and a process tool. The manipulator has a modular design for its subsystems and can reach all areas of the first wall in the distance of 15 mm and in the range of ±90 o along toroidal direction. It will be folded and hidden in the designated horizontal port during plasma discharge period.

  16. The 'end of AIDS' project: Mobilising evidence, bureaucracy, and big data for a final biomedical triumph over AIDS.

    Science.gov (United States)

    Leclerc-Madlala, Suzanne; Broomhall, Lorie; Fieno, John

    2017-12-04

    Efforts are currently underway by major orchestrators and funders of the global AIDS response to realise the vision of achieving an end to AIDS by 2030. Unlike previous efforts to provide policy guidance or to encourage 'best practice' approaches for combatting AIDS, the end of AIDS project involves the promotion of a clear set of targets, tools, and interventions for a final biomedical solution to the epidemic. In this paper, we examine the bureaucratic procedures of one major AIDS funder that helped to foster a common vision and mission amongst a global AIDS community with widely divergent views on how best to address the epidemic. We focus on the methods, movements, and materials that are central to the project of ending AIDS, including those related to biomedical forms of evidence and big data science. We argue that these approaches have limitations and social scientists need to pay close attention to the end of AIDS project, particularly in contexts where clinical interventions might transform clinical outcomes, but where the social, economic, and cultural determinants of HIV and AIDS remain largely intact and increasingly obscured.

  17. Navajo transmission project. Final Environmental Impact Statement (FEIS)

    International Nuclear Information System (INIS)

    1997-08-01

    Dine Power Authority, a Navajo Nation enterprise, proposes to construct a 500 kilovolt transmission line planned to deliver electrical power from the Shiprock Substation in northwestern New Mexico to the Marketplace Substation in southern Nevada. The line would relieve constraints on transmission of electricity west from the Four Corners area; improve operational flexibility and reliability of the overall system; and allow increased economical transfers, sales, and purchases in the Rocky Mountains/Four Corners/Desert Southwest region. Also, the project allows an opportunity for the Navajo Nation to participate in the electrical utility industry and promote economic development to benefit the people of the Navajo Nation. Six alternatives were considered and include (1) energy conservation and electric load management, (2) new generation facilities, (3) use of existing transmission systems, (4) alternative transmission technologies, (5) no action, and (6) the proposed action. For the proposed action, the following alternative routes and ancillary facility locations are addressed in the EIS: four alternative routes and five substations in the eastern portion of the project area; and six alternative routes, three substation sites, and a microwave communication facility in the western portion of the project area. The existing condition of the environmental resources in the project area is described, and potential impacts on those resources as a result of the proposed action are addressed. The impacts of the proposed action would be caused mainly by access roads, tower sites, and other associated facilities on soils, vegetation, wildlife, and cultural and paleontological resources; and the impact of the transmission line's presence on visual resources and land uses. Public comments on the draft EIS are addressed in this FEIS

  18. Hellsgate Winter Range: Wildlife Mitigation Project. Final Environmental Assessment

    International Nuclear Information System (INIS)

    1995-03-01

    BPA proposes to fund the Hellsgate Winter Range: Wildlife Mitigation Project (Project) in a cooperative effort with the Colville Confederated Tribes and the Bureau of Indian Affairs (BIA). The Project is intended to mitigate for wildlife and wildlife habitat adversely affected by the construction of Grand Coulee and Chief Joseph Dams and their reservoirs. The Project would allow the sponsors to secure land and conduct wildlife habitat improvement and long-term management activities within the boundaries of the Colville Indian Reservation. BPA has prepared an Environmental Assessment (EA) (DOE/EA-0940) evaluating the potential environmental effects of the proposed Project (Alternative B) and No Action (Alternative A). Protection and re-establishment of riparian and upland habitat on the Colville Indian Reservation, under Alternative B, would not have a significant adverse environmental impact because: (1) there would be only limited, mostly short-term adverse impacts on soils, water quality, air quality, vegetation, and wildlife (including no effect on endangered species); and (2) there would be no adverse effect on water quantity, cultural resources, or land use. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required and BPA is issuing this FONSI

  19. All projects related to india | Page 8 | IDRC - International ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Region: South Asia, Central Asia, Far East Asia, Bangladesh, Sri Lanka, India, Nepal, ... small and off-farm enterprises, especially those operated by women, in South Asia. ... Asymmetric Demography and Global Financial Governance. Project.

  20. High Power RF Transmitters for ICRF Applications on EAST

    International Nuclear Information System (INIS)

    Mao Yuzhou; Yuan Shuai; Zhao Yanping; Zhang Xinjun; Chen Gen; Cheng Yan; Wang Lei; Ju Songqing; Deng Xu; Qin Chengming; Yang Lei; Kumazawa, R.

    2013-01-01

    An Ion Cyclotron Range of Frequency (ICRF) system with a radio frequency (RF) power of 4 × 1.5 MW was developed for the Experimental Advanced Superconducting Tokamak (EAST). High RF power transmitters were designed as a part of the research and development (R and D) for an ICRF system with long pulse operation at megawatt levels in a frequency range of 25 MHz to 70 MHz. Studies presented in this paper cover the following parts of the high power transmitter: the three staged high power amplifier, which is composed of a 5 kW wideband solid state amplifier, a 100 kW tetrode drive stage amplifier and a 1.5 MW tetrode final stage amplifier, and the DC high voltage power supply (HVPS). Based on engineering design and static examinations, the RF transmitters were tested using a matched dummy load where an RF output power of 1.5 MW was achieved. The transmitters provide 6 MW RF power in primary phase and will reach a level up to 12 MW after a later upgrade. The transmitters performed successfully in stable operations in EAST and HT-7 devices. Up to 1.8 MW of RF power was injected into plasmas in EAST ICRF heating experiments during the 2010 autumn campaign and plasma performance was greatly improved.

  1. Seward Park High School Project CABES 1984-1985. OEA Evaluation Report.

    Science.gov (United States)

    New York City Board of Education, Brooklyn. Office of Educational Assessment.

    Career Advancement through Bilingual Educational Skills (Project CABES) completed the second year of a 3-year funding cycle at Seward Park High School on Manhattan's Lower East Side. Project CABES serves 233 recently immigrated, predominantly low-income, ninth through twelfth grade, Hispanic students of limited English proficiency (LEP). Included…

  2. [The final situation in the Turkey "Stent for Life" project].

    Science.gov (United States)

    Ertaş, Gökhan; Kozan, Omer; Değertekin, Muzaffer; Kervan, Umit; Aksoy, Mehmet; Koç, Orhan; Göktekin, Omer

    2012-09-01

    The Stent for Life (SFL) project's main mission is to increase the use of primary percutaneous coronary intervention (PCI) in more than 70% of all acute ST segment elevation myocardial infarction (STEMI) patients. Previous to the SFL project, thrombolysis was the dominant reperfusion strategy since a low percentage of acute STEMI patients had access to primary PCI in our country. In this study, we present the main barriers of access to primary PCI in the centers that were involved with the SFL project. Patients with acute STEMI admitted to the centers that were involved in the SFL project between 2009 and 2011 were included in the analysis. Since the inception of the SFL project, the primary PCI rate has reached over 90% in SFL pilot cities. In the last 5 years, the number of ambulances and emergency stations has increased. Since the collaboration with 112 Emergency Service, a great majority of cases were reached via the emergency medical system. The mean door-to-balloon time for the pilot cities was 54.72±43.66 minutes. After three years of the SFL project, primary PCI has emerged as the preferred reperfusion strategy for patients with STEMI in pilot cities.

  3. Gas demand growth and trade in South-East Europe: What perspectives for Bulgaria?

    International Nuclear Information System (INIS)

    Brendow, K.

    2002-01-01

    Gas demand and trade are said to grow in South-East Europe, and inter-regional gas transit is believed to gain importance. Despite a 5 to 10 year delay in economics and energy reforms compared to EU accession countries, prospects for economic recovery and a sustained growth of gas demand around 3.9%/year to 2020 in the region and 6.7% in Bulgaria appear real. Growth is contained by investment needs, vested interests in, and competition from, coal and nuclear as well as concerns about future gas prices, and import dependence. The densification of national and regional gas systems will proceed. Inter-regional (North-South and East-West) high-capacity gas pipeline will emerge as a tempting business perspective. While these perspectives are medium- and long-term, competition among pipeline projects is already waging at present. Bulgaria, Romania and Greece position themselves so as to safeguard future transit revenues, the latter country, in cooperation with Turkey, appearing to move fast with the support of the EU. A region wide optimisation of infrastructure projects appears desirable, however national strategic interests may conflict. (author)

  4. Final Scientific/Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Newbold, Kenneth F.

    2013-11-26

    Led by James Madison University, Valley 25x?25 promotes using a diverse energy portfolio to achieve the goal of 25 percent renewable energy by 2025, including renewables like wind, biomass, solar, and geothermal. A primary emphasis is energy efficiency, which offers the best opportunities to decrease the use and impact of non-renewable energy sources. Endorsed by the national 25x?25 organization, Valley 25x?25 serves as an East Coast Demonstration Project, and as such, partners with regional businesses, local and state governments, institutions of higher education, and K-12 schools to explore how Valley resources can contribute to the development of innovative energy solutions.

  5. Development and test of decoupler for ICRF antenna in EAST

    Energy Technology Data Exchange (ETDEWEB)

    Chen, Gen, E-mail: chengen@ipp.ac.cn; Mao, Yuzhou; Zhao, Yanping; Yuan, Shuai; Zhang, Xinjun; Qing, Chengming

    2016-06-15

    Highlights: • The mechanism of decoupler for ICRF antenna is proposed. • Three candidate assembly positions for the decouper can be used. • The performance relies on the ohmic dissipation and the assembly position of decoupler. - Abstract: Ion Cyclotron Range of Frequency (ICRF) heating has been adopted in EAST tokamak as one of main auxiliary heating methods. The ICRF antenna usually consists of multiple launching elements because of limited port and space of tokamak device. Mutual coupling between straps has been observed in previous EAST ICRF current drive experiments. Due to adverse effects of such mutual coupling, many issues induced by cross power cannot be ignored, such as power imbalance in feed lines, high voltage standing wave ratio (VSWR), and etc. To restrain such mutual coupling, A device named decoupler was developed and tested in EAST ICRF system. According to the admittance matrix of load, three assembly positions (oscillation position, optimum position, and smooth position) along transmission line for the decoupler were taken into account and tested. The test results showed that ohmic dissipation in decoupler could not be neglected, which partly influenced the decoupling performance. The oscillation position and optimum position could restrain such adverse effects of ohmic dissipation and showed good decoupling performance. However, they cannot ensure the steady operation during H-mod due to the load variation. Finally, the smooth position has been adopted for EAST I port antenna because of steady decoupling performance comprised with engineering error and load resilience, which sincerely enhance the capability of system operation.

  6. Final Report. Montpelier District Energy Project

    Energy Technology Data Exchange (ETDEWEB)

    Baker, Jessie [City of Montpelier Vermont, Montpelier, VT (United States). Dept. of Public Works; Motyka, Kurt [City of Montpelier Vermont, Montpelier, VT (United States). Dept. of Public Works; Aja, Joe [State of Vermont, Montpelier, VT (United States). Dept. of Buildings and General Services; Garabedian, Harold T. [Energy & Environmental Analytics, Montpelier, VT (United States)

    2015-03-30

    The City of Montpelier, in collaboration with the State of Vermont, developed a central heat plant fueled with locally harvested wood-chips and a thermal energy distribution system. The project provides renewable energy to heat a complex of state buildings and a mix of commercial, private and municipal buildings in downtown Montpelier. The State of Vermont operates the central heat plant and the system to heat the connected state buildings. The City of Montpelier accepts energy from the central heat plant and operates a thermal utility to heat buildings in downtown Montpelier which elected to take heat from the system.

  7. Outfall 51 air stripping feasibility study for the Reduction of Mercury in Plant Effluent (RMPE) Project. Revision 1

    International Nuclear Information System (INIS)

    1997-01-01

    Within the US Department of Energy's Oak Ridge Y-12 Plant there are a number of industrial wastewater discharge points or outfalls that empty into East Fork Poplar Creek (EFPC). EFPC originates within and runs continuously throughout the plant site and subsequently flows out the east end of the Y-12 Plant into the City of Oak Ridge. Mercury is present in outfall discharges due to contact of water with the soils surrounding past mercury-use buildings. As a result, the Reduction of Mercury in Plant Effluent (RMPE) Project was developed to achieve and maintain environmental compliance with regards to mercury, and, in particular with the National Pollutant Discharge Elimination System permit for the Y-12 Plant. To achieve a reduction in mercury loading to EFPC, a number of options have already been studied and implemented as part of the RMPE project. With the successful implementation of these options, Outfall 51 remains as a significant contributor to mercury load to EFPC. The primary purpose of this project is to determine the feasibility of removing mercury from contaminated spring water using air stripping. In order to accomplish this goal, a number of different areas were addressed. A pilot-scale unit was tested in the field using actual mercury-contaminated source water. Properties which impact the mercury removal via air stripping were reviewed to determine their effect. Also, enhanced testing was performed to improve removal efficiencies. Finally, the variable outfall flow was studied to size appropriate processing equipment for full-scale treatment

  8. All projects related to | Page 527 | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Project. At first glance, Asia seems to have all the organizations, skills, policies and facilities essential for ... Topic: MIGRANT WORKERS, WOMEN WORKERS. Region: Central Asia, Far East Asia, South Asia, Taiwan, Hong Kong, Singapore.

  9. Climatic variability of east Malaysia

    International Nuclear Information System (INIS)

    Camerlengo, A.L.; Saadon, M.N.; Awang, M.; Somchit, H.; Rang, L.Y.

    2001-01-01

    The objective of this paper is to learn the variability of atmospheric pressure, relative humidity and insolation in East Malaysia. The main results of our study are: (1) a gentle pressure gradient is observed at the east coast in the boreal winter, (2) smaller atmospheric pressure values are noted during the first inter-monsoon period all across East Malaysia, (3) lesser insolation values are observed in Sarawak and at the east coast during the boreal winter as compared to the boreal summer, and (4) a poleward increase of insolation is registered. (author)

  10. Artificial Intelligence Project

    Science.gov (United States)

    1990-01-01

    Symposium on Aritificial Intelligence and Software Engineering Working Notes, March 1989. Blumenthal, Brad, "An Architecture for Automating...Artificial Intelligence Project Final Technical Report ARO Contract: DAAG29-84-K-OGO Artificial Intelligence LaboratO"ry The University of Texas at...Austin N>.. ~ ~ JA 1/I 1991 n~~~ Austin, Texas 78712 ________k A,.tificial Intelligence Project i Final Technical Report ARO Contract: DAAG29-84-K-0060

  11. OECD/NEA Aagesta decontamination project. Phase 1, final report

    International Nuclear Information System (INIS)

    1982-12-01

    The objective of the project is to utilize the four primary loops of the Aagesta reactor to demonstrate decontamination methods for PWR primary systems. The first phase of the project consisted of laboratory scale tests. The methods tested were developed at a) Studsvik Energiteknik AB, Sweden (a soft chemistry). b) Kraftwerk Union AG, Federal Republic of Germany, (two chemistries, one soft and one hard). c) Swiss Federal Institute of Reactor Research (two chemistries, one soft and one hard). d) Berkeley Nuclear Laboratories, United Kingdom, (a soft chemistry). The test programme consisted of decontamination tests on steam generator tubing and other active material from Aagesta and a number of operating reactors as well as material compatibility tests on standardized samples of a representative selection of modern PWR primary system materials. Six countries have participated in Phase I of the project - the four countries named above as well as the United States of America and Italy. Studsvik Energiteknik AB was appointed Project leader. The results show that all six processes in general met the acceptance criteria both regarding decontamination and corrosion. The decontamination results with the hard chemistries were rather uneven. (Author)

  12. Project GICC-Rhone Final report of part I

    International Nuclear Information System (INIS)

    2002-12-01

    The project aims to give an evaluation of the impacts on the french Rhone basin, of the climatic change resulting of a double of the CO 2 content in the atmosphere (possible in 2050). This report gives an evaluation of the researches progress. It describes the topic of the part I, the hydrological simulations realized and the analysis of the hydrological impacts. It provides also recommendations for the part II. The following topics are presented: the objectives of the project; the data and the atmospheric scenari construction methods on the Rhone basin under the climatic change; the used hydrological models; the results analysis in terms of hydrogeological impacts; the limits of the approach; and a bibliography. (A.L.B.)

  13. Chinese-Middle East Relations and Their Implications for U.S. Policy

    Science.gov (United States)

    1992-06-01

    temporary hiatus of 13 enforced isolation, predominantly to the United States. This youthful and/or professional peregrination provides another very rich ...an extensive millenial westward migration from the Middle East and Persia through to and including Greece, Rome, Europe and finally into the New...either radical or moderate reform wings. They are variously referred to in the western press as go-for-it and to-get- rich -is-glorious "reformers" on

  14. Emergency Fish Restoration Project; Final Report 2002.

    Energy Technology Data Exchange (ETDEWEB)

    LeCaire, Richard

    2003-03-01

    Lake Roosevelt is a 151-mile impoundment created by the construction of Grand Coulee Dam during the early 1940's. The construction of the dam permanently and forever blocked the once abundant anadromous fish runs to the upper Columbia Basin. Since the construction of Grand Coulee Dam in 1943 and Chief Joseph Dam in 1956 this area is known as the blocked area. The blocked area is totally dependant upon resident fish species to provide a subsistence, recreational and sport fishery. The sport fishery of lake Roosevelt is varied but consists mostly of Rainbow trout (Oncorhynchus mykiss), Kokanee salmon (Oncorhynchus nerka), Walleye (Stizostedion vitreum) Small mouth bass (Micropterus dolomieui) and white sturgeon (Acipenser transmontanus). Currently, Bonneville Power Administration funds and administers two trout/kokanee hatcheries on Lake Roosevelt. The Spokane Tribe of Indians operates one hatchery, the Washington Department of Fish and Wildlife the other. In addition to planting fish directly into Lake Roosevelt, these two hatcheries also supply fish to a net pen operation that also plants the lake. The net pen project is administered by Bonneville Power funded personnel but is dependant upon volunteer labor for daily feeding and monitoring operations. This project has demonstrated great success and is endorsed by the Colville Confederated Tribes, the Spokane Tribe of Indians, the Washington Department of Fish and Wildlife, local sportsmen associations, and the Lake Roosevelt Forum. The Lake Roosevelt/Grand Coulee Dam area is widely known and its diverse fishery is targeted by large numbers of anglers annually to catch rainbow trout, kokanee salmon, small mouth bass and walleye. These anglers contribute a great deal to the local economy by fuel, grocery, license, tackle and motel purchases. Because such a large portion of the local economy is dependant upon the Lake Roosevelt fishery and tourism, any unusual operation of the Lake Roosevelt system may have a

  15. Coordination and Control of Globally Distributed Software Projects

    NARCIS (Netherlands)

    P.C. van Fenema (Paul)

    2002-01-01

    textabstractRecently, software development and implementation projects have globalized at a rapid pace. Companies in North America, Europe, and the Far East are beginning to integrate international Information Technology (IT) resources to support operations across the globe. Offshore IT services

  16. All projects related to | Page 448 | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Project. Since 2004, many sub-Saharan commodity-exporting countries have ... Telecentre-Europe Network : Facilitating Knowledge Sharing and Building the Community ... COMMUNITY FACILITIES, INFORMATION TECHNOLOGY, MANAGEMENT TRAINING. Region: Far East Asia, Philippines, Central Asia, South Asia.

  17. 76 FR 75542 - Porcupine Dam Hydropower Project; Notice of Preliminary Permit Application Accepted for Filing...

    Science.gov (United States)

    2011-12-02

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14290-000] Porcupine Dam Hydropower Project; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments...), proposing to study the feasibility of the Porcupine Dam Hydropower Project to be located on the East Fork of...

  18. Spatial patterns of sea surface temperature influences on East African precipitation as revealed by empirical orthogonal teleconnections

    Directory of Open Access Journals (Sweden)

    Tim eAppelhans

    2016-02-01

    Full Text Available East Africa is characterized by a rather dry annual precipitation climatology with two distinct rainy seasons. In order to investigate sea surface temperature driven precipitation anomalies for the region we use the algorithm of empirical orthogonal teleconnection analysis as a data mining tool. We investigate the entire East African domain as well as 5 smaller sub-regions mainly located in areas of mountainous terrain. In searching for influential sea surface temperature patterns we do not focus any particular season or oceanic region. Furthermore, we investigate different time lags from zero to twelve months. The strongest influence is identified for the immediate (i.e. non-lagged influences of the Indian Ocean in close vicinity to the East African coast. None of the most important modes are located in the tropical Pacific Ocean, though the region is sometimes coupled with the Indian Ocean basin. Furthermore, we identify a region in the southern Indian Ocean around the Kerguelen Plateau which has not yet been reported in the literature with regard to precipitation modulation in East Africa. Finally, it is observed that not all regions in East Africa are equally influenced by the identified patterns.

  19. Final report of the decontamination and decommissioning of Building 39 at the Grand Junction Projects Office Facility

    International Nuclear Information System (INIS)

    Widdop, M.R.

    1996-07-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission's domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, is also the remedial action contractor. The soil beneath Building 39 was radiologically contaminated and the building was demolished in 1992. The soil area within the footprint of the building has been remediated in accordance with the identified standards and the area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building

  20. Final Environmental Statement related to the operation of WPPSS Nuclear Project No. 3 (Docket No. 50-508)

    International Nuclear Information System (INIS)

    1985-05-01

    This Final Environmental Statement contains the second assessment of the environmental impact associated with the Washington Public Power System Nuclear Project No. 3 (WNP-3) pursuant to the National Environmental Policy Act of 1969 (NEPA) and Title 10 of the Code of Federal Regulations, Part 51, as amended, of the Nuclear Regulatory Commission regulations. This statement examines the environment, environmental consequences and mitigating actions, and environmental benefits and costs. Land use and terrestrial and aquatic resource impacts will be small. Operational impacts to historic and archeological sites will be negligible. The effects of routine operations, energy transmission and periodic maintenance of rights-of-way and transmission facilities should not jeopardize any populations of endangered or threatened species. No significant impacts are anticipated from normal operational releases of radioactivity. The risk of radiation exposure associated with accidental release of radioactivity is very low. The net socioeconomic effects of the project will be beneficial