WorldWideScience

Sample records for earthmoving equipment

  1. Modelling and design of undercarriage components of large-scale earthmoving equipment in tar sand operations

    Energy Technology Data Exchange (ETDEWEB)

    Szymanski, J.; Frimpong, S.; Sobieski, R. [Alberta Univ., Edmonton, AB (Canada). Centre for Advanced Energy and Minerals Research

    2004-07-01

    This presentation described the fundamental and applied research work which has been carried out at the University of Alberta's Centre for Advanced Energy and Minerals Research to improve the undercarriage elements of large scale earthmoving equipment used in oil sands mining operations. A new method has been developed to predict the optimum curvature and blade geometry of earth moving equipment such as bulldozers and motor graders. A mathematical relationship has been found to approximate the optimum blade shape for reducing cutting resistance and fill resistance. The equation is a function of blade geometry and soil properties. It is the first model that can mathematically optimize the shape of a blade on earth moving equipment. A significant saving in undercarriage components can be achieved from reducing the amount of cutting and filling resistance for this type of equipment working on different soils. A Sprocket Carrier Roller for a Tracked Vehicle was also invented to replace the conventional cylindrical carrier roller. The new sprocket type carrier roller offers greater support for the drive track and other components of the undercarriage assembly. A unique retaining pin assembly has also been designed to detach connecting disposable wear parts from earthmoving equipment. The retaining pin assembly is easy to assemble and disassemble and includes reusable parts. 13 figs.

  2. Earth-moving equipment as base machines in forest work. Final report of an NSR project

    Energy Technology Data Exchange (ETDEWEB)

    Johansson, Jerry [ed.

    1997-12-31

    Excavators have been used for forest draining for a long time in the Nordic countries. Only during the 1980s they were introduced as base machines for other forest operations, such as mounding, processing, harvesting, and road construction and road maintenance. Backhoe loaders were introduced in forestry at a somewhat later stage and to a smaller degree. The number of this type of base machines in forestry is so far small and is increasing very slowly. The NSR project `Earth moving equipment as base machines in forest work` started in 1993 and the project ended in 1995. The objective of the project was to obtain an overall picture of this type of machines up to a point where the logs are at landing site, ready for transportation to the industry. The project should cover as many aspects as possible. In order to obtain this picture, the main project was divided into sub projects. The sub projects separately described in this volume are (1) Excavators in ditching operations and site preparation, (2) Backhoe loaders in harvesting operations, (3) Excavators in wood cutting operations, (4) Tracked excavators in forestry operations, (5) Crawler versus wheeled base machines for single-grip harvester, and (6) Soil changes - A comparison between a wheeled and a tracked forest machine

  3. Maintaining productive earthmover performance

    Energy Technology Data Exchange (ETDEWEB)

    Chadwick, J.

    1992-01-01

    Maintenance management is essential to a productive mining operation. 80-90% of maintenance should be planned, the rest emergency. Many earthmover manufacturers offer extensive services to optimize machine productivity, e.g. equipment management software. Product support agreements (PSA) are becoming more common in open pit operations. These are normally agreements between mines and equipment dealers to provide product support requirements based on who can provide what most efficiently. The advantages for the customer are known servicing, cost effectiveness, minimum capital investment, and the fact PSAs are responsive to change. The operating experience of Round Mountain Gold, USA, Crouch Mining, UK, and Unatrac and Tractor Equipment, Ghana with PSAs is discussed. Crouch Mining operate England's largest open-cast coal operation, the Stobswood mine, Northumberland under contract to British Coal's Opencast-Executive. Crouch has agreed repair and maintenance contracts with 3 different dealer organisations for 3 separate machine fleets i.e. hydraulic excavators, a backhoe and 2 face shovels; 2 blasthole drills; and the 13 caterpillar trucks. These repair and maintenance contracts are described. 4 refs., 6 photos

  4. DETERMINATION AND ANALYSIS OF CHANGE POWER CHARACTER AND POWER PARAMETERS OF EARTHMOVING- TRANSPORT WORKING PROCESS MACHINES OF CYCLIC ACTION

    Directory of Open Access Journals (Sweden)

    KHMARA L. A.

    2017-05-01

    Full Text Available Summary. Raising of problem. Efficiency of implementation working process an earthmoving-transport machine on digging of soil depends on complete realization of power equipment and hauling properties working equipment during implementation this operation. Most effective will be the mode of digging when from his beginning to the final stage a power equipment will realize nominal power, and working equipment maximal KKD at that skidding of mover does not exceed the defined possible value. However, for the traditional constructions of earthmoving-transport machines cyclic action, for such, as a drag shovel, bulldozer, realizing these terms is heavy. The feature of process digging consists in the increase of resistance to digging soil from the ego of the initial stage to eventual when hauling possibilities of machine will be maximally realized. Therefore the calculation of power equipment takes into account the power indexes of machine on the final stage of digging. Thus the unstationarity of working process results in the under exploitation of power equipment machine and hereupon appearance her bits and pieces. The size of bits and pieces power depends on the stage digging of soil, his physical and mechanical properties, terms cooperation of working equipment with the surface of motion. One of methods realization surplus power, this use it for the drive intensifiers working process of earthmoving-transport machines. Therefore for the effective choice parameters of intensifier, his office hours it is necessary to know the size of bits and pieces of power and character her change during digging of soil. The purpose of the article. Development of methodology determination remaining power equipment an earthmoving-transport machine on the example self-propelled drags hovel, character her change at digging of soil taking into account physical and mechanical properties of soil and terms cooperation working equipment with the surface of motion. Conclusion

  5. Work wellness of employees in the earthmoving equipment industry / Izel Rost

    OpenAIRE

    Rost, Izel

    2006-01-01

    Major changes that emphasise the importance of a balanced work and family life have occurred within organisations. Inability to manage this integration between the work and home domains can affect the performance of organisations and the wellbeing of their employees. In order to measure work-home interaction and wellbeing, it is important to use valid, equivalent and reliable instruments. However, there is a lack of empirical research when investigating work-home interaction, b...

  6. Optimal design of earth-moving machine elements with cusp catastrophe theory application

    Science.gov (United States)

    Pitukhin, A. V.; Skobtsov, I. G.

    2017-10-01

    This paper deals with the optimal design problem solution for the operator of an earth-moving machine with a roll-over protective structure (ROPS) in terms of the catastrophe theory. A brief description of the catastrophe theory is presented, the cusp catastrophe is considered, control parameters are viewed as Gaussian stochastic quantities in the first part of the paper. The statement of optimal design problem is given in the second part of the paper. It includes the choice of the objective function and independent design variables, establishment of system limits. The objective function is determined as mean total cost that includes initial cost and cost of failure according to the cusp catastrophe probability. Algorithm of random search method with an interval reduction subject to side and functional constraints is given in the last part of the paper. The way of optimal design problem solution can be applied to choose rational ROPS parameters, which will increase safety and reduce production and exploitation expenses.

  7. Equipment considerations

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    Trace or ultratrace analyses require that the HPLC equipment used, including the detector, be optimal for such determinations. HPLC detectors are discussed at length in Chapter 4; discussion here is limited to the rest of the equipment. In general, commercial equipment is adequate for trace analysis; however, as the authors approach ultratrace analysis, it becomes very important to examine the equipment thoroughly and optimize it, where possible. For this reason they will review the equipment commonly used in HPLC and discuss the optimization steps. Detectability in HPLC is influenced by two factors (1): (a) baseline noise or other interferences that lead to errors in assigning the baseline absorbance; (b) peak width. 87 refs

  8. [Hydrotherapy equipment].

    Science.gov (United States)

    Tsibikov, V B; Ragozin, S I; Mikheeva, L V

    1985-01-01

    A flow-chart is developed demonstrating the relation between medical and prophylactic institutions within the organizational structure of the rehabilitation system and main types of rehabilitation procedures. In order to ascertain the priority in equipping rehabilitation services with adequate hardware the special priority criterion is introduced. The highest priority is assigned to balneotherapeutic and fangotherapeutic services. Based on the operation-by-operation analysis of clinical processes related to service and performance of balneologic procedures the preliminary set of clinical devices designed for baths, basins and showers in hospitals and rehabilitation departments is defined in a generalized form.

  9. Cryogenic equipment

    International Nuclear Information System (INIS)

    Leger, L.; Javellaud, J.; Caro, C.; Gilguy, R.; Testard, O.

    1966-06-01

    The cryostats presented here were built from standard parts; this makes it possible to construct a great variety of apparatus at minimum cost. The liquid nitrogen and helium reservoirs were designed so as to reduce losses to a minimum, and so as to make the cryostats as autonomous as possible. The experimental enclosure which is generally placed in the lower part of the apparatus requires a separate study in every case. Furthermore, complete assemblies such as transfer rods, isolated traps and high vacuum valves, were designed with a similar regard for the economic aspects and for the need for standardization. This equipment thus satisfies a great variety of experimental needs; it is readily adaptable and the consumptions of helium and liquid nitrogen are very low. (authors) [fr

  10. Medical Issues: Equipment

    Science.gov (United States)

    ... Information Packets Equipment Pool Living With SMA Medical Issues Palliative Breathing Orthopedics Nutrition Equipment Daily Life At ... curesma.org > support & care > living with sma > medical issues > equipment Equipment Individuals with SMA often require a ...

  11. Semiconductor Manufacturing equipment introduction

    International Nuclear Information System (INIS)

    Im, Jong Sun

    2001-02-01

    This book deals with semiconductor manufacturing equipment. It is comprised of nine chapters, which are manufacturing process of semiconductor device, history of semiconductor manufacturing equipment, kinds and role of semiconductor manufacturing equipment, construction and method of semiconductor manufacturing equipment, introduction of various semiconductor manufacturing equipment, spots of semiconductor manufacturing, technical elements of semiconductor manufacturing equipment, road map of technology of semiconductor manufacturing equipment and semiconductor manufacturing equipment in the 21st century.

  12. Selection of equipment for equipment qualification

    International Nuclear Information System (INIS)

    Torr, K.G.

    1989-01-01

    This report describes the methodology applied in selecting equipment in the special safety systems for equipment qualification in the CANDU 600 MW nuclear generating stations at Gentilly 2 and Point Lepreau. Included is an explanation of the selection procedure adopted and the rationale behind the criteria used in identifying the equipment. The equipment items on the list have been grouped into three priority categories as a planning aid to AECB staff for a review of the qualification status of the special safety systems

  13. Shipboard and laboratory equipment

    Digital Repository Service at National Institute of Oceanography (India)

    Shyamprasad, M.; Ramaswamy, V.

    The polymetallic nodules occur at an average depth of 4500 m. Adequate equipment and techniques are required for the exploration at such depths. Shipboard and various laboratory equipments for the sampling of polymetallic nodules is described...

  14. Remote handling equipment

    International Nuclear Information System (INIS)

    Clement, G.

    1984-01-01

    After a definition of intervention, problems encountered for working in an adverse environment are briefly analyzed for development of various remote handling equipments. Some examples of existing equipments are given [fr

  15. Exercise Equipment: Neutral Buoyancy

    Science.gov (United States)

    Shackelford, Linda; Valle, Paul

    2016-01-01

    Load Bearing Equipment for Neutral Buoyancy (LBE-NB) is an exercise frame that holds two exercising subjects in position as they apply counter forces to each other for lower extremity and spine loading resistance exercises. Resistance exercise prevents bone loss on ISS, but the ISS equipment is too massive for use in exploration craft. Integrating the human into the load directing, load generating, and motion control functions of the exercise equipment generates safe exercise loads with less equipment mass and volume.

  16. BP volume reduction equipment

    International Nuclear Information System (INIS)

    Kitamura, Yoshinori; Muroo, Yoji; Hamanaka, Isao

    2003-01-01

    A new type of burnable poison (BP) volume reduction system is currently being developed. Many BP rods, a subcomponent of spent fuel assemblies are discharged from nuclear power reactors. This new system reduces the overall volume of BP rods. The main system consists of BP rod cutting equipment, equipment for the recovery of BP cut pieces, and special transport equipment for the cut rods. The equipment is all operated by hydraulic press cylinders in water to reduce operator exposure to radioactivity. (author)

  17. Electrical equipment qualification

    International Nuclear Information System (INIS)

    Farmer, W.S.

    1983-01-01

    Electrical equipment qualification research programs being carried out by CEA, JAERI, and Sandia Laboratories are discussed. Objectives of the program are: (1) assessment of accident simulation methods for electrical equipment qualification testing; lower coarse (2) evaluation of equipment aging and accelerated aging methods; (3) determine radiation dose spectrum to electrical equipment and assess simulation methods for qualification; (4) identify inadequacies in electrical equipment qualification procedures and standards and potential failure modes; and (5) provide data for verifying and improving standards, rules and regulatory guides

  18. Space Heating Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Rafferty, Kevin D.

    1998-01-01

    The performance evaluation of space heating equipment for a geothermal application is generally considered from either of two perspectives: (a) selecting equipment for installation in new construction, or (b) evaluating the performance and retrofit requirements of an existing system. With regard to new construction, the procedure is relatively straightforward. Once the heating requirements are determined, the process need only involve the selection of appropriately sized hot water heating equipment based on the available water temperature. It is important to remember that space heating equipment for geothermal applications is the same equipment used in non-geothermal applications. What makes geothermal applications unique is that the equipment is generally applied at temperatures and flow rates that depart significantly from traditional heating system design. This chapter presents general considerations for the performance of heating equipment at non-standard temperature and flow conditions, retrofit of existing systems, and aspects of domestic hot water heating.

  19. Renewal of radiological equipment.

    Science.gov (United States)

    2014-10-01

    In this century, medical imaging is at the heart of medical practice. Besides providing fast and accurate diagnosis, advances in radiology equipment offer new and previously non-existing options for treatment guidance with quite low morbidity, resulting in the improvement of health outcomes and quality of life for the patients. Although rapid technological development created new medical imaging modalities and methods, the same progress speed resulted in accelerated technical and functional obsolescence of the same medical imaging equipment, consequently creating a need for renewal. Older equipment has a high risk of failures and breakdowns, which might cause delays in diagnosis and treatment of the patient, and safety problems both for the patient and the medical staff. The European Society of Radiology is promoting the use of up-to-date equipment, especially in the context of the EuroSafe Imaging Campaign, as the use of up-to-date equipment will improve quality and safety in medical imaging. Every healthcare institution or authority should have a plan for medical imaging equipment upgrade or renewal. This plan should look forward a minimum of 5 years, with annual updates. Teaching points • Radiological equipment has a definite life cycle span, resulting in unavoidable breakdown and decrease or loss of image quality which renders equipment useless after a certain time period.• Equipment older than 10 years is no longer state-of-the art equipment and replacement is essential. Operating costs of older equipment will be high when compared with new equipment, and sometimes maintenance will be impossible if no spare parts are available.• Older equipment has a high risk of failure and breakdown, causing delays in diagnosis and treatment of the patient and safety problems both for the patient and the medical staff.• Every healthcare institution or authority should have a plan for medical imaging equipment upgrade or replacement. This plan should look forward a

  20. RETRIEVAL EQUIPMENT DESCRIPTIONS

    International Nuclear Information System (INIS)

    J. Steinhoff

    1997-01-01

    The objective and the scope of this document are to list and briefly describe the major mobile equipment necessary for waste package (WP) retrieval from the proposed subsurface nuclear waste repository at Yucca Mountain. Primary performance characteristics and some specialized design features of the equipment are explained and summarized in the individual subsections of this document. There are no quality assurance requirements or QA controls in this document. Retrieval under normal conditions is accomplished with the same fleet of equipment as is used for emplacement. Descriptions of equipment used for retrieval under normal conditions is found in Emplacement Equipment Descriptions, DI: BCAF00000-01717-5705-00002 (a document in progress). Equipment used for retrieval under abnormal conditions is addressed in this document and consists of the following: (1) Inclined Plane Hauler; (2) Bottom Lift Transporter; (3) Load Haul Dump (LHD) Loader; (4) Heavy Duty Forklift for Emplacement Drifts; (5) Covered Shuttle Car; (6) Multipurpose Vehicle; and (7) Scaler

  1. Medical equipment management

    CERN Document Server

    Willson, Keith; Tabakov, Slavik

    2013-01-01

    Know What to Expect When Managing Medical Equipment and Healthcare Technology in Your Organization As medical technology in clinical care becomes more complex, clinical professionals and support staff must know how to keep patients safe and equipment working in the clinical environment. Accessible to all healthcare professionals and managers, Medical Equipment Management presents an integrated approach to managing medical equipment in healthcare organizations. The book explains the underlying principles and requirements and raises awareness of what needs to be done and what questions to ask. I

  2. Data communication equipment

    International Nuclear Information System (INIS)

    Kim, Hak Seon; Lee, Sang Mok

    1998-02-01

    The contents of this book are introduction of data communication on definition, purpose and history, information terminal about data communication system and data transmission system, data transmit equipment of summary, transmission cable, data port, concentrator and front-end processor, audio communication equipment like phones, radio communication equipment of summary on foundation of electromagnetic waves, AM transmitter, AM receiver, FM receiver and FM transmitter, a satellite and mobile communication equipment such as earth station, TT and C and Cellular phone, video telephone and new media apparatus.

  3. Cooling of electronic equipment

    DEFF Research Database (Denmark)

    A. Kristensen, Anders Schmidt

    2003-01-01

    Cooling of electronic equipment is studied. The design size of electronic equipment decrease causing the thermal density to increase. This affect the cooling which can cause for example failures of critical components due to overheating or thermal induced stresses. Initially a pin fin heat sink...

  4. Capital Equipment Replacement Decisions

    OpenAIRE

    Batterham, Robert L.; Fraser, K.I.

    1995-01-01

    This paper reviews the literature on the optimal replacement of capital equipment, especially farm machinery. It also considers the influence of taxation and capital rationing on replacement decisions. It concludes that special taxation provisions such as accelerated depreciation and investment allowances are unlikely to greatly influence farmers' capital equipment replacement decisions in Australia.

  5. Implementation of an ex situ stabilization technique at the Sand Springs superfund site to solidify and stabilize acid tar sludges involving a quick-lime based stabilization process and innovative equipment design

    International Nuclear Information System (INIS)

    McManus, R.W.; Grajczak, P.; Wilcoxson, J.C.; Webster, S.D.

    1997-01-01

    An old refinery site was safely remediated a year before schedule and for 25% less than final engineering estimates for the stabilization remedy thanks to energetic project management and innovative design involving ex situ stabilization/solidification of acid tar sludges. A quicklime based process, Dispersion by Chemical Reaction (DCR trademark), was employed to solidify and stabilize (SS) over 103,000 cubic meters (135,000 cubic yards) of petroleum waste, mostly acidic tarry sludge. The SS process was selected over competing methods because it afforded minimal volume increase, could readily achieve Record of Decision (ROD) specified physical and chemical treatment goals, could be implemented with treatment equipment that minimized emissions, and could be performed with low reagent usage and at low cost. To ensure treatment goals were achieved and an accelerated schedule met, a custom designed and fabricated transportable treatment unit (TTU) was employed to implement the process. The treated material was visually soil-like in character, it was left in stockpiles for periods of time, and it was placed and compacted in the on site landfill using standard earth-moving equipment

  6. HVAC systems and equipment

    Energy Technology Data Exchange (ETDEWEB)

    Taylor, S.T. (Linford Air and Refrigeration Company, Oakland, CA (US))

    1990-02-01

    The author discusses the section of the ASHRAE Standard 90.1-1989 which addresses HVAC systems and equipment. New features of HVAC systems mandatory general requirements are described. New prescriptive requirements are detailed.

  7. Personal Protective Equipment

    National Research Council Canada - National Science Library

    1998-01-01

    ... of personal protective equipment A safety program for new employees is a necessary part of any orientation program An on-going safety program should be used to motivate employees to continue to use...

  8. Electronic equipment packaging technology

    CERN Document Server

    Ginsberg, Gerald L

    1992-01-01

    The last twenty years have seen major advances in the electronics industry. Perhaps the most significant aspect of these advances has been the significant role that electronic equipment plays in almost all product markets. Even though electronic equipment is used in a broad base of applications, many future applications have yet to be conceived. This versatility of electron­ ics has been brought about primarily by the significant advances that have been made in integrated circuit technology. The electronic product user is rarely aware of the integrated circuits within the equipment. However, the user is often very aware of the size, weight, mod­ ularity, maintainability, aesthetics, and human interface features of the product. In fact, these are aspects of the products that often are instrumental in deter­ mining its success or failure in the marketplace. Optimizing these and other product features is the primary role of Electronic Equipment Packaging Technology. As the electronics industry continues to pr...

  9. CV equipment responsibilities

    CERN Document Server

    Pirollet, B

    2008-01-01

    This document describes the limits of the responsibilities of the TS/CV for fire fighting equipment at the LHC. The various interfaces, providers and users of the water supply systems and clean water raising systems are described.

  10. Equipment for hydraulic testing

    International Nuclear Information System (INIS)

    Jacobsson, L.; Norlander, H.

    1981-07-01

    Hydraulic testing in boreholes is one major task of the hydrogeological program in the Stripa Project. A new testing equipment for this purpose was constructed. It consists of a downhole part and a surface part. The downhole part consists of two packers enclosing two test-sections when inflated; one between the packers and one between the bottom packer and the bottom of the borehole. A probe for downhole electronics is also included in the downhole equipment together with electrical cable and nylon tubing. In order to perform shut-in and pulse tests with high accuracy a surface controlled downhole valve was constructed. The surface equipment consists of the data acquisition system, transducer amplifier and surface gauges. In the report detailed descriptions of each component in the whole testing equipment are given. (Auth.)

  11. Equipment abnormality monitoring device

    International Nuclear Information System (INIS)

    Ando, Yasumasa

    1991-01-01

    When an operator hears sounds in a plantsite, the operator compares normal sounds of equipment which he previously heard and remembered with sounds he actually hears, to judge if they are normal or abnormal. According to the method, there is a worry that abnormal conditions can not be appropriately judged in a case where the number of objective equipments is increased and in a case that the sounds are changed gradually slightly. Then, the device of the present invention comprises a plurality of monitors for monitoring the operation sound of equipments, a recording/reproducing device for recording and reproducing the signals, a selection device for selecting the reproducing signals among the recorded signals, an acoustic device for converting the signals to sounds, a switching device for switching the signals to be transmitted to the acoustic device between to signals of the monitor and the recording/reproducing signals. The abnormality of the equipments can be determined easily by comparing the sounds representing the operation conditions of equipments for controlling the plant operation and the sounds recorded in their normal conditions. (N.H.)

  12. Prioritizing equipment for replacement.

    Science.gov (United States)

    Capuano, Mike

    2010-01-01

    It is suggested that clinical engineers take the lead in formulating evaluation processes to recommend equipment replacement. Their skill, knowledge, and experience, combined with access to equipment databases, make them a logical choice. Based on ideas from Fennigkoh's scheme, elements such as age, vendor support, accumulated maintenance cost, and function/risk were used.6 Other more subjective criteria such as cost benefits and efficacy of newer technology were not used. The element of downtime was also omitted due to the data element not being available. The resulting Periop Master Equipment List and its rationale was presented to the Perioperative Services Program Council. They deemed the criteria to be robust and provided overwhelming acceptance of the list. It was quickly put to use to estimate required capital funding, justify items already thought to need replacement, and identify high-priority ranked items for replacement. Incorporating prioritization criteria into an existing equipment database would be ideal. Some commercially available systems do have the basic elements of this. Maintaining replacement data can be labor-intensive regardless of the method used. There is usually little time to perform the tasks necessary for prioritizing equipment. However, where appropriate, a clinical engineering department might be able to conduct such an exercise as shown in the following case study.

  13. Radioactive decontamination of equipment

    International Nuclear Information System (INIS)

    1982-03-01

    After a recall of some definitions relating to decontamination techniques and of the regulation into effect, the principles to be respected to arrange rationally work zones are quoted while insisting more particularly on the types of coatings which facilitate maintenance operations and the dismantling of these installations. Then, the processes and equipments to use in decontamination units for routine or particular operations are described; the list of recommended chemical products to decontaminate the equipment is given. The influence of these treatments on the state and the duration of life of equipments is studied, and some perfectible methods are quoted. In the appendix, are given: the limits of surface contamination accepted in the centers; a standard project which defines the criteria of admissible residual contamination in wastes considered as cold wastes; some remarks on the interest that certain special ventilation and air curtain devices for the protection of operators working on apparatus generating contaminated dusts [fr

  14. Equipment Operational Requirements

    Energy Technology Data Exchange (ETDEWEB)

    Greenwalt, B; Henderer, B; Hibbard, W; Mercer, M

    2009-06-11

    The Iraq Department of Border Enforcement is rich in personnel, but poor in equipment. An effective border control system must include detection, discrimination, decision, tracking and interdiction, capture, identification, and disposition. An equipment solution that addresses only a part of this will not succeed, likewise equipment by itself is not the answer without considering the personnel and how they would employ the equipment. The solution should take advantage of the existing in-place system and address all of the critical functions. The solutions are envisioned as being implemented in a phased manner, where Solution 1 is followed by Solution 2 and eventually by Solution 3. This allows adequate time for training and gaining operational experience for successively more complex equipment. Detailed descriptions of the components follow the solution descriptions. Solution 1 - This solution is based on changes to CONOPs, and does not have a technology component. It consists of observers at the forts and annexes, forward patrols along the swamp edge, in depth patrols approximately 10 kilometers inland from the swamp, and checkpoints on major roads. Solution 2 - This solution adds a ground sensor array to the Solution 1 system. Solution 3 - This solution is based around installing a radar/video camera system on each fort. It employs the CONOPS from Solution 1, but uses minimal ground sensors deployed only in areas with poor radar/video camera coverage (such as canals and streams shielded by vegetation), or by roads covered by radar but outside the range of the radar associated cameras. This document provides broad operational requirements for major equipment components along with sufficient operational details to allow the technical community to identify potential hardware candidates. Continuing analysis will develop quantities required and more detailed tactics, techniques, and procedures.

  15. Charging equipment. Ladegeraet

    Energy Technology Data Exchange (ETDEWEB)

    Neumann, E

    1981-09-17

    The invention refers to a charging equipment, particularly on board charging equipment for charging traction batteries of an electric vehicle from the AC mains supply, consisting of a DC converter, which contains a controlled power transistor, a switching off unloading circuit and a power transmitter, where the secondary winding is connected in series with a rectifier diode, and a smoothing capacitor is connected in parallel with this series circuit. A converter module is provided, which consists of two DC voltage converters, whose power transistors are controlled by a control circuit in opposition with a phase displacement of 180/sup 0/.

  16. Experimental equipment, ch. 6

    International Nuclear Information System (INIS)

    Boomstra, F.; Hoogenboom, A.M.; Prins, C.M.; Strasters, B.A.; Vermeer, A.; Wit, P. de; Zwol, N.A. van.

    1977-01-01

    The experimental equipment in use at Utrecht university is discussed. Attention is paid to the tandem Van de Graaff accelerator and the 4MV and 1MV accelerators. The detection systems for gamma-ray spectroscopy are reviewed with emphasis on the compton-suppression spectrometer. The data-handling system used for experiments with the tandem is also briefly discussed

  17. Equipment gift to Monaco

    International Nuclear Information System (INIS)

    1970-01-01

    Research work at the Agency's Laboratory of Marine Radioactivity in Monaco, including that concerned with pollution of the sea, has been made more effective by its latest acquisition of equipment. This is a spectrophotometer donated by the Federal Republic of Germany. (author)

  18. Lifetime of Mechanical Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Leland, K.

    1999-07-01

    The gas plant at Kaarstoe was built as part of the Statpipe gas transport system and went on stream in 1985. In 1993 another line was routed from the Sleipner field to carry condensate, and the plant was extended accordingly. Today heavy additional supply- and export lines are under construction, and the plant is extended more than ever. The main role of the factory is to separate the raw gas into commercial products and to pump or ship it to the markets. The site covers a large number of well-known mechanical equipment. This presentation deals with piping, mechanical and structural disciplines. The lifetime of mechanical equipment is often difficult to predict as it depends on many factors, and the subject is complex. Mechanical equipment has been kept in-house, which provides detailed knowledge of the stages from a new to a 14 years old plant. The production regularity has always been very high, as required. The standard of the equipment is well kept, support systems are efficient, and human improvisation is extremely valuable.

  19. Safeguards techniques and equipment

    International Nuclear Information System (INIS)

    1997-01-01

    The current booklet is intended to give a full and balanced description of the techniques and equipment used for both nuclear material accountancy and containment and surveillance measures, and for the new safeguards measure of environmental sampling. As new verification measures continue to be developed, the material in the booklet will be periodically reviewed and updated versions issued. (author)

  20. Equipping tomorrow's fire manager

    Science.gov (United States)

    Christopher A. Dicus

    2008-01-01

    Fire managers are challenged with an ever-increasing array of both responsibilities and critics. As in the past, fire managers must master the elements of fire behavior and ecology using the latest technologies. In addition, today’s managers must be equipped with the skills necessary to understand and liaise with a burgeoning group of vocal stakeholders while also...

  1. Electrical equipment design library

    International Nuclear Information System (INIS)

    1994-01-01

    This book guides the design supervision, construction order for electrical equipment. The contents of this library are let's use electricity like this, leading-in-pole and casual power, electric pole install below 300KVA, electric pole install below 301∼1000KVA, electric pole install exceed 1000KVA, rooftop install exceed 1000KVA, CUBICLE type, 154KV services. It adds an appendix.

  2. Orphee reactor experimental equipment

    International Nuclear Information System (INIS)

    1987-01-01

    Experimental equipment around the ORPHEE reactor is presented. The neutron source; and the spectrometers and sample environment (inelastic and quasi-elastic scattering, elastic scattering, spread scattering, small angle scattering) are described. An experiment proposal and reports guide is supplied [fr

  3. Seismic qualification of equipment

    International Nuclear Information System (INIS)

    Heidebrecht, A.C.; Tso, W.K.

    1983-03-01

    This report describes the results of an investigation into the seismic qualification of equipment located in CANDU nuclear power plants. It is particularly concerned with the evaluation of current seismic qualification requirements, the development of a suitable methodology for the seismic qualification of safety systems, and the evaluation of seismic qualification analysis and testing procedures

  4. Underground coal equipment

    Energy Technology Data Exchange (ETDEWEB)

    Chadwick, J.

    2002-12-01

    This paper reports on increasing automation and enhanced productivity on longwalls, new development cutting and bolting technologies and haulage systems. Amongst equipment discussed is DBT's Electra series EL3000 shearer, the Dosco LH1400 roadheader with onboard bolters, and Joy 12 CM30 continuous miners. 4 photos.

  5. Visual communication and terminal equipment

    International Nuclear Information System (INIS)

    Kang, Cheol Hui

    1988-06-01

    This book is divided two parts about visual communication and terminal equipment. The first part introduces visual communication, which deals with foundation of visual communication, technique of visual communication, equipment of visual communication, a facsimile and pictorial image system. The second part contains terminal equipment such as telephone, terminal equipment for data transmission on constitution and constituent of terminal equipment for data transmission, input device and output device, terminal device and up-to-date terminal device.

  6. Visual communication and terminal equipment

    Energy Technology Data Exchange (ETDEWEB)

    Kang, Cheol Hui

    1988-06-15

    This book is divided two parts about visual communication and terminal equipment. The first part introduces visual communication, which deals with foundation of visual communication, technique of visual communication, equipment of visual communication, a facsimile and pictorial image system. The second part contains terminal equipment such as telephone, terminal equipment for data transmission on constitution and constituent of terminal equipment for data transmission, input device and output device, terminal device and up-to-date terminal device.

  7. Equipment cost optimization

    International Nuclear Information System (INIS)

    Ribeiro, E.M.; Farias, M.A.; Dreyer, S.R.B.

    1995-01-01

    Considering the importance of the cost of material and equipment in the overall cost profile of an oil company, which in the case of Petrobras, represents approximately 23% of the total operational cost or 10% of the sales, an organization for the optimization of such costs has been established within Petrobras. Programs are developed aiming at: optimization of life-cycle cost of material and equipment; optimization of industrial processes costs through material development. This paper describes the methodology used in the management of the development programs and presents some examples of concluded and ongoing programs, which are conducted in permanent cooperation with suppliers, technical laboratories and research institutions and have been showing relevant results

  8. X-ray equipment

    International Nuclear Information System (INIS)

    Redmayne, I.G.B.

    1988-01-01

    The patent concerns a warning and protection system for mobile x-ray equipment used for 'on site' radiography, so that workers in the vicinity of such a working unit can be alerted to its presence. The invention is a local repeater warning system which gives a preliminary warning that energisation of the tubehead is imminent, as well as a switch near the tubehead to abort or inhibit energisation. The latter switch allows personnel caught in the vicinity of the tubehead to prevent energisation. The preliminary warning may be flashing lamps or by a klaxon. The control unit for the equipment may include a monitoring circuit to detect failure of the warning light or klaxon. (U.K.)

  9. X-ray equipment

    Energy Technology Data Exchange (ETDEWEB)

    Redmayne, I.G.B.

    1988-01-06

    The patent concerns a warning and protection system for mobile x-ray equipment used for 'on site' radiography, so that workers in the vicinity of such a working unit can be alerted to its presence. The invention is a local repeater warning system which gives a preliminary warning that energisation of the tubehead is imminent, as well as a switch near the tubehead to abort or inhibit energisation. The latter switch allows personnel caught in the vicinity of the tubehead to prevent energisation. The preliminary warning may be flashing lamps or by a klaxon. The control unit for the equipment may include a monitoring circuit to detect failure of the warning light or klaxon. (U.K.).

  10. Tube for irradiation equipment

    International Nuclear Information System (INIS)

    Goehrich, K.; Vogt, H.

    1979-01-01

    This patent describes a tube for irradiation equipment for limiting an emergent beam, with a baseplate, possessing a central aperture, intended for attaching to the equipment, as well as four carrier plates, each of which possesses a limiting edge and a sliding edge located at right angles thereto. The carrier plates are located parallel to the baseplate, the limiting edge of each carrier plate resting against the sliding edge of the adjacent carrier plate and each of the two mutually opposite pairs of carrier plates being displaceable, parallel to the direction of its sliding edges and symmetrically to the center of the transmission aperture, for the purpose of continuously varying the transmission aperture defined by the limiting edges, during which displacement each of the displaced carrier plates carries with it the carrier plate, resting against the limiting edge of the former plate, parallel to the direction of the limiting edge of the latter plate. 8 claims

  11. Equipment for isotope diagnostics

    International Nuclear Information System (INIS)

    Platz, W.

    1976-01-01

    The invention concerns an improvement of equipment for isotope diagnostics allowing to mark special intensity ranges of the recorded measurements by means of different colors. For undisturbed operation it is of advantage to avoid electric circuits between movable and unmovable parts of the color recorder. According to the invention, long gear wheels of glass fiber-reinforced polyamide are used for these connections. (ORU) [de

  12. Soviet equipment flies in

    CERN Multimedia

    CERN PhotoLab

    1978-01-01

    End of February 1977 a Soviet Ilyushin-76 heavy freight aircraft landed at Cointrin airport having on board fifty large wire proprtional chambers and associated apparatus, together weighing 10 tons, supplied by the Joint Institute for Nuclear Research, Dubna, USSR. The equipment was for the CERN- Dubna-Munich-Saclay experiment NA4 on deep inelastic muon scattering being set up in the North Area of SPS. See Weekly Bulletin 11/78.

  13. Labelling of equipment dispensers.

    Science.gov (United States)

    Gray, D C

    1993-01-01

    A new labelling system for use on medical equipment dispensers is tested. This system uses one of the objects stored in each unit of the dispenser as the 'label', by attaching it to the front of the dispenser with tape. The new system was compared to conventional written labelling by timing subjects asked to select items from two dispensers. The new system was 27% quicker than the conventional system. Images Fig. 1 PMID:8110335

  14. Equipment Obsolescence Management Program

    Energy Technology Data Exchange (ETDEWEB)

    Redmond, J.

    2014-07-01

    Nuclear Power Plant (NPP) Operators are challenged with securing reliable supply channels for safety related equipment due to equipment obsolescence. Many Original Equipment Manufacturers (OEMs) have terminated production of spare parts and product life-cycle support. The average component life cycles are much shorter than the NPP design life, which means that replacement components and parts for the original NPP systems are not available for the complete design life of the NPPs. The lack or scarcity of replacement parts adversely affects plant reliability and ultimately the profitability of the affected NPPs. This problem is further compounded when NPPs pursue license renewal and approval for plant-life extension. A reliable and predictable supply of replacement co components is necessary for NPPs to remain economically competitive and meet regulatory requirements and guidelines. Electrical and I and C components, in particular, have short product life cycles and obsolescence issues must be managed pro actively and not reactively in order to mitigate the risk to the NPP to ensure reliable and economic NPP operation. (Author)

  15. Personal protective equipment

    International Nuclear Information System (INIS)

    2004-01-01

    This Practical Radiation Technical Manual is one of a series that has been designed to provide guidance on radiological protection for employers, radiation protection officers, managers and other technically competent persons who have responsibility for ensuring the safety of employees working with ionizing radiation. The Manual may be used with the appropriate IAEA Practical Radiation Safety Manuals to provide training, instruction and information for all employees engaged in work with ionizing radiation. Personal protective equipment (PPE) includes clothing or other special equipment that is issued to individual workers to provide protection against actual or potential exposure to ionizing radiations. It is used to protect each worker against the prevailing risk of external or internal exposure in circumstances in which it is not reasonably practicable to provide complete protection by means of engineering controls or administrative methods. Adequate personal protection depends on PPE being correctly selected, fitted and maintained. Appropriate training for the users and arrangements to monitor usage are also necessary to ensure that PPE provides the intended degree of protection effectively. This Manual explains the principal types of PPE, including protective clothing and respiratory protective equipment (RPE). Examples of working procedures are also described to indicate how PPE should be used within a safe system of work. The Manual will be of most benefit if it forms part of a more comprehensive training programme or is supplemented by the advice of a qualified expert in radiation protection. Some of the RPE described in this Manual should be used under the guidance of a qualified expert

  16. Scientific Equipment Division - Overview

    International Nuclear Information System (INIS)

    Halik, J.

    2001-01-01

    Full text: The Scientific Equipment Division consists of the Design Group and the Mechanical Workshop. The activity of the Division includes the following: - designing of devices and equipment for experiments in physics, their mechanical construction and assembly. In particular, there are vacuum chambers and installations for HV and UHV; - maintenance and upgrading of the existing installations and equipment in our Institute; - participation of our engineers and technicians in design works, equipment assembly and maintenance for experiments in foreign laboratories. The Design Group is equipped with PC-computers and AutoCAD graphic software (release 2000 and Mechanical Desktop 4.0) and a AO plotter, what allows us to make drawings and 2- and 3-dimensional mechanical documentation to the world standards. The Mechanical Workshop can offer a wide range of machining and treatment methods with satisfactory tolerances and surface quality. It offers the following possibilities: - turning - cylindrical elements of a length up to 2000 mm and a diameter up to 400 mm, and also disc-type elements of a diameter up to 600 mm and a length not exceeding 300 mm; - milling - elements of length up to 1000 mm and gear wheels of diameter up to 300 mm; - grinding - flat surfaces of dimensions up to 300 mm x 1000 mm and cylindrical elements of a diameter up to 200 mm and a length up to 800 mm; - drilling - holes of a diameter up to 50 mm; - welding - electrical and gas welding, including TIG vacuum-tight welding; - soft and hard soldering; - mechanical works including precision engineering; - plastics treatment - machining and polishing using diamond milling, modelling, lamination of various shapes and materials, including plexiglas, scintillators and light-guides; - painting - paint spraying with possibility of using furnace-fred drier of internal dimensions of 800 mm x 800 mm x 800 mm. Our workshop posses CNC milling machine which can be used for machining of work-pieces up to 500 kg

  17. Mining face equipment

    Energy Technology Data Exchange (ETDEWEB)

    G, Litvinskiy G; Babyuk, G V; Yakovenko, V A

    1981-01-07

    Mining face equipment includes drilling advance wells, drilling using explosives on the contour bore holes, loading and transporting the crushed mass, drilling reinforcement shafts, injecting reinforcement compounds and moving the timber. Camouflet explosives are used to form relaxed rock stress beyond the mining area to decrease costs of reinforcing the mining area by using nonstressed rock in the advance well as support. The strengthening solution is injected through advanced cementing wells before drilling the contour bores as well as through radial cementing wells beyond the timbers following loading and transport of the mining debris. The advance well is 50-80 m.

  18. Coal ash monitoring equipment

    Energy Technology Data Exchange (ETDEWEB)

    Clayton, C G; Wormald, M R

    1978-10-02

    The monitoring equipment is used to determine the remainder from combustion (ash slack) of coal in wagons designed for power stations. Next to the rails, a neutron source (252 Cf, 241 Am/Be) is situated, which irradiates the coal with neutrons at a known dose, which produces the reaction 27 Al (n ..gamma..) Al 28. The aluminium content is a measure of the remainder. The 1.78 MeV energy is measured downstream of the rail with a detector. The neutron source can only act in the working position of a loaded wagon.

  19. Management of Transportation Equipment.

    Science.gov (United States)

    1982-11-01

    Record% % %. "jP -M -. M LIh TRANSPORTATION MAENTKENAI4CE SHOP WORKLOAD CONTROL WORK CENTER SADR A-OR .a’* tLR 4.,R53 8114LM 0 o 251 50 75 100 125 ISO ...PDBP 06 7 4892 TRACTOR, WHEEL, INDUST, 14001-20000 PDBP 06 7 4893 TRACTOR, WHEEL, INDUST, 20001-27000 PDBP 06 7 4894 TRACTOR, WHEEL, INDUST, 27001 PDBP...27K TRACTOR, WHEEL, INDUST, 27001 PDBP & UP P-i LINE ITEM 07 LIGHTING AND POWER GENERATION EQUIPMENT 5110 T FLOODLIGHT ELEC FLOODLIGHT, ELEC, TRUCK

  20. Californium-252 Program Equipment Evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Chattin, Fred Rhea [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Wilson, Kenton [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Ezold, Julie G. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2017-12-01

    To successfully continue the 252Cf production and meet the needs of the customers, a comprehensive evaluation of the Building 7920 processing equipment was requested to identify equipment critical to the operational continuity of the program.

  1. Characterization equipment essential drawing plan

    International Nuclear Information System (INIS)

    WILSON, G.W.

    1999-01-01

    The purpose of this document is to list the Characterization equipment drawings that are classified as Essential Drawings. Essential Drawings: Are those drawings identified by the facility staff as necessary to directly support the safe operation of the facility or equipment (HNF 1997a). The Characterization equipment drawings identified in this report are deemed essential drawings as defined in HNF-PRO-242, Engineering Drawing Requirements (HNF 1997a). These drawings will be prepared, revised, and maintained per HNF-PRO-440, Engineering Document Change Control (HNF 1997b). All other Characterization equipment drawings not identified in this document will be considered Support drawings until the Characterization Equipment Drawing Evaluation Report is completed

  2. Coal mining equipment

    International Nuclear Information System (INIS)

    Stein, R.R.; Martin, T.W.

    1991-01-01

    The word in longwall components is big, and these larger components have price tags to match. The logic behind the greater investment is that it will yield high production rates and good uptime statistics. This is true in most cases. More important than single-shift tonnage records, average shift production continues to climb upwards. This paper reports on the quality, and more significantly, the quantity of service supplied for long-wall equipment, which has reached levels that would have been seen as unachievable when longwall mining was first introduced in the U.S. The school of thought then was that longwall would increase productivity in part by reducing the number of production units and thus reducing the number of personnel employed underground. The expectation of fewer employees turned out to be unrealistic. That was probably one reason that some early attempts to install longwall system looked more like failures than vision of the future

  3. Reactor fuel charging equipment

    International Nuclear Information System (INIS)

    Wade, Elman.

    1977-01-01

    In many types of reactor fuel charging equipment, tongs or a grab, attached to a trolley, housed in a guide duct, can be used for withdrawing from the core a selected spent fuel assembly or to place a new fuel assembly in the core. In these facilities, the trolley may have wheels that roll on rails in the guide duct. This ensures the correct alignment of the grab, the trolley and fuel assembly when this fuel assembly is being moved. By raising or lowering such a fuel assembly, the trolley can be immerged in the coolant bath of the reactor, whereas at other times it can be at a certain level above the upper surface of the coolant bath. The main object of the invention is to create a fuel handling apparatus for a sodium cooled reactor with bearings lubricated by the sodium coolant and in which the contamination of these bearings is prevented [fr

  4. Chapter 12. Space Heating Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Rafferty, Kevin D.

    1998-01-01

    The performance evaluation of space heating equipment for a geothermal application is generally considered from either of two perspectives: (a) selecting equipment for installation in new construction, or (b) evaluating the performance and retrofit requirements of an existing system. With regard to new construction, the procedure is relatively straightforward. Once the heating requirements are determined, the process need only involve the selection of appropriately sized hot water heating equipment based on the available water temperature. It is important to remember that space heating equipment for geothermal applications is the same equipment used in non-geothermal applications. What makes geothermal applications unique is that the equipment is generally applied at temperatures and flow rates that depart significantly from traditional heating system design. This chapter presents general considerations for the performance of heating equipment at non-standard temperature and flow conditions, retrofit of existing systems, and aspects of domestic hot water heating.

  5. Equipment repair in coal mines

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, S

    1982-01-01

    Most equipment in Chinese coal mines consists of machinery and equipment produced in the 1950s; the efficiency of 4-62, CTD-57 and 70B/sub 2/ ventilators is 15% lower than that of new ones; that of SSM and AYaP pumps, 10% lower than of modern ones. Equipment renovation is done in three ways: replacing obsolete equipment with new equipment of the same type; improving the performance of existing equipment by introducing efficiency and reconstruction; and replacing obsolete equipment with advanced equipment. It is indicated that the second way, for example, replacement of 4-62 ventilator blades with a maximum efficiency of 73% by 4-72 ventilator blades raises its efficiency to 90%. Replacing the 8DA-8x3 water pump, having a maximum efficiency of 63%, with the 200D 43x3 pump with a maximum efficiency of 78%, enables an electricity savings of 7000 yuan per year, which exceeds all replacement costs (600 yuan). The need to improve equipment maintenance and preventive work to increase equipment service life and to introduce new techniques and efficiency is noted.

  6. 21 CFR 866.4540 - Immunonephelometer equipment.

    Science.gov (United States)

    2010-04-01

    ...) MEDICAL DEVICES IMMUNOLOGY AND MICROBIOLOGY DEVICES Immunology Laboratory Equipment and Reagents § 866.4540 Immunonephelometer equipment. (a) Identification. Immunonephelometer equipment for clinical use...

  7. 21 CFR 866.4520 - Immunofluorometer equipment.

    Science.gov (United States)

    2010-04-01

    ...) MEDICAL DEVICES IMMUNOLOGY AND MICROBIOLOGY DEVICES Immunology Laboratory Equipment and Reagents § 866.4520 Immunofluorometer equipment. (a) Identification. Immunofluorometer equipment for clinical use with...

  8. Equipment standards for interventional cardiology

    International Nuclear Information System (INIS)

    Dowling, A.; Gallagher, A.; Walsh, C.; Malone, J.

    2005-01-01

    Interventional radiology has seen rapid growth in cardiology and represents an alternative to hazardous surgery. Recently there has been a substantial growth in the number of procedures being performed and interventional cardiology (IC) procedures are the most common interventional procedures in Europe. Advances in imaging technology have facilitated the development of increasingly complex radiological IC equipment. Currently, the technology is developing at a rate ahead of supporting research, equipment standards and a regulatory framework. International standards play a key role in the design, manufacture and performance of radiological IC equipment. A survey of 12 IC systems (15 imaging chains) was conducted in Irish hospitals. The aim of the study was to assess the imbalance between rapidly advancing technology and existing standards and to propose recommendations for new IC equipment standards. The results demonstrate the need for definitive equipment requirements and standardisation in the design, manufacture, acceptance and maintenance of IC equipment. (authors)

  9. Generation of equipment response spectrum considering equipment-structure interaction

    International Nuclear Information System (INIS)

    Lee, Sang Hoon; Yoo, Kwang Hoon

    2005-01-01

    Floor response spectra for dynamic response of subsystem such as equipment, or piping in nuclear power plant are usually generated without considering dynamic interaction between main structure and subsystem. Since the dynamic structural response generally has the narrow-banded shapes, the resulting floor response spectra developed for various locations in the structure usually have high spectral peak amplitudes in the narrow frequency bands corresponding to the natural frequencies of the structural system. The application of such spectra for design of subsystems often leads to excessive design conservatisms, especially when the equipment frequency and structure are at resonance condition. Thus, in order to provide a rational and realistic design input for dynamic analysis and design of equipment, dynamic equipment-structure interaction (ESI) should be considered in developing equipment response spectrum which is particularly important for equipment at the resonance condition. Many analytical methods have been proposed in the past for developing equipment response spectra considering ESI. However, most of these methods have not been adapted to the practical applications because of either the complexities or the lack of rigorousness of the methods. At one hand, mass ratio among the equipment and structure was used as an important parameter to obtain equipment response spectra. Similarly, Tseng has also proposed the analytical method for developing equipment response spectra using mass ratio in the frequency domain. This method is analytically rigorous and can be easily validated. It is based on the dynamic substructuring method as applied to the dynamic soil-structure interaction (SSI) analysis, and can relatively easily be implemented for practical applications without to change the current dynamic analysis and design practice for subsystems. The equipment response spectra derived in this study are also based on Tseng's proposed method

  10. Overall Equipment Effectiveness Implementation Criteria

    Science.gov (United States)

    Abramova, I. G.; Abramov, D. A.

    2018-01-01

    This article documents the methods applied in production control technics specifically focused on commonly used parameter OEE (Overall Equipment Effectiveness). The indicators of extensive and intensive use of equipment are considered. Their appointment this is comparison in the same type of production within the industry and comparison of single-type and / or different types of equipment in terms of capacity. However, it is shown that there is no possibility of revealing the reasons for the machine’s operation: productive / unproductive, with disturbances. Therefore, in the article reveals the approaches to calculating the indicator characterizing the direct operation of the equipment. The Machine Load coefficient is approaching closely to the indicator of the efficiency of the use of equipment. Methods analysis is proceeded through the historically applied techniques such as “Stopwatch” and “Motion” studies. Was performed the analysis of the efficiency index of OEE equipment using the comparable indexes performance of equipment in the Russian practice. An important indicator of OEE contains three components. The meaning of each of them reflects historically applicable indicators. The value of the availability of equipment indicator is close to the value of the equipment extensibility index. The value of the indicator of the efficiency of work can be compared with the characteristic of the capacity of the equipment and the indicator of the quality level can meet the requirements for compliance with the manufacturing technology. Shown that the sum of the values of the coefficient of “Availability” of the equipment and the value of the “Factor of compaction of working hours” are one. As well as the total value of the indicator “level of quality” and the coefficient of marriage given in the result unit. The measurability of the indicators makes it possible to make a prediction about efficiency of the equipment.

  11. Information technology equipment cooling system

    Science.gov (United States)

    Schultz, Mark D.

    2014-06-10

    According to one embodiment, a system for removing heat from a rack of information technology equipment may include a sidecar indoor air to liquid heat exchanger that cools warm air generated by the rack of information technology equipment. The system may also include a liquid to liquid heat exchanger and an outdoor heat exchanger. The system may further include configurable pathways to connect and control fluid flow through the sidecar heat exchanger, the liquid to liquid heat exchanger, the rack of information technology equipment, and the outdoor heat exchanger based upon ambient temperature and/or ambient humidity to remove heat from the rack of information technology equipment.

  12. Management methodology for pressure equipment

    Science.gov (United States)

    Bletchly, P. J.

    Pressure equipment constitutes a significant investment in capital and a major proportion of potential high-risk plant in many operations and this is particularly so in an alumina refinery. In many jurisdictions pressure equipment is also subject to statutory regulation that imposes obligations on Owners of the equipment with respect to workplace safety. Most modern technical standards and industry codes of practice employ a risk-based approach to support better decision making with respect to pressure equipment. For a management system to be effective it must demonstrate that risk is being managed within acceptable limits.

  13. Cryogenic equipment; Materiel cryogenique

    Energy Technology Data Exchange (ETDEWEB)

    Leger, L; Javellaud, J; Caro, C; Gilguy, R; Testard, O

    1966-06-01

    The cryostats presented here were built from standard parts; this makes it possible to construct a great variety of apparatus at minimum cost. The liquid nitrogen and helium reservoirs were designed so as to reduce losses to a minimum, and so as to make the cryostats as autonomous as possible. The experimental enclosure which is generally placed in the lower part of the apparatus requires a separate study in every case. Furthermore, complete assemblies such as transfer rods, isolated traps and high vacuum valves, were designed with a similar regard for the economic aspects and for the need for standardization. This equipment thus satisfies a great variety of experimental needs; it is readily adaptable and the consumptions of helium and liquid nitrogen are very low. (authors) [French] De nombreuses experiences utilisant les basses temperatures, necessitent l'emploi d'un materiel cryogenique complexe n'existant pas dans le commerce. Les cryostats presentes ici ont ete realises a partir d'elements standard, ce qui permet, malgre la diversite des appareils, de realiser un ensemble a moindre frais. Les reservoirs d'azote et d'helium liquides ont ete concus de facon a limiter les pertes et a conferer au cryostat la plus grande autonomie possible. L'enceinte experimentale situee en general dans la partie inferieure de l'appareil necessite dans tous les cas une etude speciale. D'autre part des ensembles complets tels que les cannes de transfert, piege isole, robinet pour vide secondaire, ont ete concus dans le meme souci de rentabilite et de standardisation. Ce materiel peut donc repondre a un grand nombre d'exigences experimentales, il est facilement adaptable, et les consommations d'helium et d'azote liquide sont tres reduites. (auteurs)

  14. 29 CFR 1926.952 - Mechanical equipment.

    Science.gov (United States)

    2010-07-01

    ... equipment that are not covered with insulating protective equipment. (c) Derrick trucks, cranes and other lifting equipment. (1) All derrick trucks, cranes and other lifting equipment shall comply with subpart N...

  15. 22 CFR 135.32 - Equipment.

    Science.gov (United States)

    2010-04-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  16. 21 CFR 1403.32 - Equipment.

    Science.gov (United States)

    2010-04-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  17. 45 CFR 602.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  18. 49 CFR 18.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  19. 34 CFR 80.32 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  20. 10 CFR 600.232 - Equipment.

    Science.gov (United States)

    2010-01-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  1. 45 CFR 1183.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  2. Food Service Equipment and Appurtenances.

    Science.gov (United States)

    National Sanitation Foundation, Ann Arbor, MI.

    Equipment design specifications are presented relating to tables of all kinds, counters, sinks and drainboards, bins, shelves, drawers, hoods and similar kitchen appurtenances, not including baking, roasting, toasting, broiling or frying equipment, food preparation machinery such as slicers, choppers, and cutters, mixers and grinders, steam…

  3. Equipe de trabalho

    Directory of Open Access Journals (Sweden)

    Gabriel Gerber Hornink

    2014-08-01

    Full Text Available   Equipe de Trabalho 2014 1. Equipe editorial Editor-Chefe Bayardo Bapstista Torres, Instituto de Química - USP, Brasil Eduardo Galembeck, Departamento de Bioquímica Instituto de Biologia UNICAMP, Brasil   Editores Gabriel Gerber Hornink, Depto. Bioquímica, Instituto de Ciências Biomédicas, Universidade - Federal de Alfenas - Unifal-MG, Brasil Vera Maria Treis Trindade, Instituto de Ciências Básicas da Saúde, Departamento de Bioquímica, Universidade Federal do Rio Grande do Sul, Brasil   Corpo Editorial Adriana Cassina, Departamento de Bioquímica, Facultad de Medicina, Universidad de la República, Uruguai Angel Herráez, Departamento de Bioquímica y Biología molecular, Universidad de Alcalá de Henares, Madrid, Espanha André Amaral Gonçalves Bianco, Universidade Federal de São Paulo (Unifesp, Brasil Denise Vaz de Macedo, Departamento de Bioquímica, Instituto de Biologia, Universidade Estadual de Campinas - Unicamp, Brasil Eneida de Paula, Departamento de Bioquímica, Instituto de Biologia, Universidade Estadual de Campinas - Unicamp, Brasil Guilherme Andrade Marson, Instituto de Química - USP, Brasil Jose Antonio Martinez Oyanedel, Universidad de Concepción, Chile Josep Maria Fernández Novell, Dept. Bioquímica i Biologia Molecular Universitat de Barcelona, Espanha Leila Maria Beltramini, Instituto de Física de São Carlos, Universidade Estadual de São Paulo - USP, Brasil Manuel João da Costa, Escola de Ciências da Saúde, Universidade do Minho, Portugal Maria Lucia Bianconi, Instituto de Bioquímica Médica Universidade Federal do Rio de Janeiro (UFRJ, Brasil María Noel Alvarez, Departamento de Bioquímica, Facultad de Medicina, Universidad de la República, Uruguai Miguel Ángel Medina Torres, Department of Molecular Biology & Biochemistry Faculty of Sciences University of Málaga, Espanha Nelma Regina Segnini Bossolan, Instituto de Física de São Carlos, Universidade de São Paulo - USP, Brasil Paulo De Avila

  4. Information technology equipment cooling method

    Science.gov (United States)

    Schultz, Mark D.

    2015-10-20

    According to one embodiment, a system for removing heat from a rack of information technology equipment may include a sidecar indoor air to liquid heat exchanger that cools air utilized by the rack of information technology equipment to cool the rack of information technology equipment. The system may also include a liquid to liquid heat exchanger and an outdoor heat exchanger. The system may further include configurable pathways to connect and control fluid flow through the sidecar heat exchanger, the liquid to liquid heat exchanger, the rack of information technology equipment, and the outdoor heat exchanger based upon ambient temperature and/or ambient humidity to remove heat generated by the rack of information technology equipment.

  5. Development of manufacturing equipment and QC equipment for DUPIC fuel

    International Nuclear Information System (INIS)

    Yang, Myung Seung; Park, J.J.; Lee, J.W.; Kim, S.S.; Yim, S.P.; Kim, J.H.; Kim, K.H.; Na, S.H.; Kim, W.K.; Shin, J.M.; Lee, D.Y.; Cho, K.H.; Lee, Y.S.; Sohn, J.S.; Kim, M.J.

    1999-05-01

    In this study, DUPIC powder and pellet fabrication equipment, welding system, QC equipment, and fission gas treatment are developed to fabricate DUPIC fuel at IMEF M6 hot cell. The systems are improved to be suitable for remote operation and maintenance with the manipulator at hot cell. Powder and pellet fabrication equipment have been recently developed. The systems are under performance test to check remote operation and maintenance. Welding chamber and jigs are designed and developed to remotely weld DUPIC fuel rod with manipulators at hot cell. Remote quality control equipment are being tested for analysis and inspection of DUPIC fuel characteristics at hot cell. And trapping characteristics is analyzed for cesium and ruthenium released under oxidation/reduction and sintering processes. The design criteria and process flow diagram of fission gas treatment system are prepared incorporating the experimental results. The fission gas treatment system has been successfully manufactured. (Author). 33 refs., 14 tabs., 91 figs

  6. TRANSPORT AND EMPLACEMENT EQUIPMENT DESCRIPTIONS

    International Nuclear Information System (INIS)

    1997-01-01

    The objective and the scope of this document are to list and briefly describe the major mobile equipment necessary for waste package (WP) Transport and Emplacement in the proposed subsurface nuclear waste repository at Yucca Mountain. Primary performance characteristics and some specialized design features of the equipment are explained and summarized in the individual subsections of this document. The Transport and Emplacement equipment described in this document consists of the following: (1) WP Transporter; (2) Reusable Rail Car; (3) Emplacement Gantry; (4) Gantry Carrier; and (5) Transport Locomotive

  7. Containment and Surveillance Equipment Compendium

    International Nuclear Information System (INIS)

    Luetters, F.O.

    1980-02-01

    The Containment and Surveillance Equipment Compendium contains information sections describing the application and status of seals, optical surveillance systems, and monitors for international safeguards systems. The Compendium is a collection of information on equipment in use (generally by the IAEA) or under development in the US in diverse programs being conducted at numerous facilities under different sponsors. The Compendium establishes a baseline for the status and applications of C/S equipment and is a tool to assist in the planning of future C/S hardware development activities. The Appendix contains design concepts which can be developed to meet future goals

  8. Data Center Equipment Location and Monitoring System

    DEFF Research Database (Denmark)

    2013-01-01

    Abstract: Data center equipment location systems include hardware and software to provide information on the location, monitoring, and security of servers and other equipment in equipment racks. The systems provide a wired alternative to the wireless RFID tag system by using electronic ID tags...... connected to each piece of equipment, each electronic ID tag connected directly by wires to an equipment rack controller on the equipment rack. The equipment rack controllers link to a central control computer that provides an operator ...

  9. EAS Equipment Authorization Grantee Registrations

    Data.gov (United States)

    Federal Communications Commission — EAS (Equipment Authorization System). Radio Frequency (RF) devices are required to be properly authorized under 47 CFR Part 2 prior to being marketed or imported...

  10. ENERGY STAR Certified Imaging Equipment

    Data.gov (United States)

    U.S. Environmental Protection Agency — Certified models meet all ENERGY STAR requirements as listed in the Version 2.0 ENERGY STAR Program Requirements for Imaging Equipment that are effective as of...

  11. EMR Measurements on NDA Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Macdonell, Alexander Thomas [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Meierbachtol, Krista Cruse [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Evans, James Walter Jr. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Mayo, Douglas R. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-07-10

    Electromagnetic radiation (EMR) emission strength measurements were performed on a suite of passive non-destructive assay (NDA) radiation detection equipment. Data were collected from 9 kHz up to 6 GHz on each of the assembled systems.

  12. Mongolia - Vocational Education - Equipment Upgrades

    Data.gov (United States)

    Millennium Challenge Corporation — Evaluation design The impact evaluation sought to identify the causal impact of exposure to equipment upgrades on subsequent outcomes. Insofar as we were not able to...

  13. Origins of eponymous orthopaedic equipment.

    Science.gov (United States)

    Meals, Clifton; Wang, Jeffrey

    2010-06-01

    Orthopaedists make great use of eponymous equipment, however the origins of these tools are unknown to many users. This history enriches, enlightens, and enhances surgical education, and may inspire modern innovation. We explored the origins of common and eponymous orthopaedic equipment. We selected pieces of equipment named for their inventors and in the broadest use by modern orthopaedists. We do not describe specialized orthopaedic implants and instruments owing to the overwhelming number of these devices. The history of this equipment reflects the coevolution of orthopaedics and battlefield medicine. Additionally, these stories evidence the primacy of elegant design and suggest that innovation is often a process of revision and refinement rather than sudden inspiration. Their history exposes surgical innovators as brilliant, lucky, hardworking, and sometimes odd. These stories amuse, enlighten, and may inspire modern orthopaedists to develop creative solutions of their own. The rich history of the field's eponymous instruments informs an ongoing tradition of innovation in orthopaedics.

  14. Operation monitor for plant equipment

    International Nuclear Information System (INIS)

    Kondo, Tetsufumi; Kanemoto, Shigeru.

    1991-01-01

    In a nuclear power plant, states of each of equipment in the plant are monitored accurately even under such a operation condition that the power is changed. That is, the fundamental idea is based on a model comparison method. A deviation between an output signal upon normal plant state obtained in a forecasting model device and that of the objective equipment in the plant are compared with a predetermined value. The result of the comparison is inputted to an alarm device to alarm the abnormality of the states of the equipment to an operator. The device of the present invention thus constituted can monitor the abnormality of the operation of equipment accurately even under such a condition that a power level fluctuates. As a result, it can remarkably contribute to mitigate operator's monitoring operation under the condition such as during load following operation. (I.S.)

  15. Equipment improvements for performance enhancement

    International Nuclear Information System (INIS)

    Gaestel, P.; Guesnon, H.; Sauze, G.

    1994-01-01

    In order to enhance the reactor availability, several improvements on reactor equipment have been developed: design optimization for stator maintenance replacement in the main alternator; adjustment modification of stator coils in the main alternator for an easier maintenance; improvement of the fuel handling line (pole crane, transfer equipment, loading machine); development of a loose part trapping system in the steam generator secondary circuit. 1 tab

  16. Low level photoneutron detection equipment

    International Nuclear Information System (INIS)

    Ji Changsong; Zhang Yuqin; Li Yuansui

    1991-01-01

    A low level photoneutron detection equipment has been developed. The photoneutrons produced by interaction of 226 Ra gamma quanta and deutron (D) target are detected with n-n discrimination detector made up of 3 He proportional counter array. The D-content information in the target can be obtained from the measured photoneutron counts. The equipment developed is mainly used for nondestructive D-content measurement of D-devices

  17. FUSRAP equipment concept development study

    International Nuclear Information System (INIS)

    Hinerman, K.B.; Smith, R.E.

    1981-01-01

    Under DOE contract, Dalton-Dalton-Newport, Inc. is performing an engineering evaluation of three selected FUSRAP sites in an effort to generate equipment concepts to perform remedial action for retrieval, packaging, storing, and transporting contaminated soil and other debris. Along with this engineering evaluation, an analysis of state and Federal regulations was made which had significant impact on the selected equipment and costs for each remedial action concept

  18. Remotely operated replaceable process equipment

    International Nuclear Information System (INIS)

    Westendorf, H.

    1987-01-01

    The coupling process of pneumatic and electrical auxiliary lines of a pneumatic control pressure line in a large cell of the reprocessing plant is carried out, together with the coupling process of the connecting flange of the process equipment. The coupling places of the auxiliary lines, such as control or supply lines, are laid in the flange parts of the flanges to be connected. The pipe flange on the frame side remains flush with the connecting flange of the process equipment. (DG) [de

  19. Partners in qualified equipment supply

    International Nuclear Information System (INIS)

    Rygg, D.E.; O'Hare, G.J.

    1993-01-01

    Industry initiatives have been taken to improve procurement practices and commercial dedication programs, formation of procurement engineering groups, emphasis on product quality, and increased engineering involvement in procurement and maintenance of qualified equipment. This poses new challenges for many licensees in terms of resources, product knowledge, and access to information normally held proprietary by equipment suppliers. Alternative approaches to future licensee/Westinghouse relationships which will allow licensees to adapt to the changing environment are discussed. 2 figs

  20. 29 CFR 97.32 - Equipment.

    Science.gov (United States)

    2010-07-01

    ...) When acquiring replacement equipment, the grantee or subgrantee may use the equipment to be replaced as... equipment (including replacement equipment), whether acquired in whole or in part with grant funds, until... established to ensure the highest possible return. (e) Disposition. When original or replacement equipment...

  1. 44 CFR 13.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ...) When acquiring replacement equipment, the grantee or subgrantee may use the equipment to be replaced as... equipment (including replacement equipment), whether acquired in whole or in part with grant funds, until... established to ensure the highest possible return. (e) Disposition. When original or replacement equipment...

  2. 24 CFR 85.32 - Equipment.

    Science.gov (United States)

    2010-04-01

    ...) When acquiring replacement equipment, the grantee or subgrantee may use the equipment to be replaced as... equipment (including replacement equipment), whether acquired in whole or in part with grant funds, until... established to ensure the highest possible return. (e) Disposition. When original or replacement equipment...

  3. 41 CFR 105-71.132 - Equipment.

    Science.gov (United States)

    2010-07-01

    .... (4) When acquiring replacement equipment, the grantee or subgrantee may use the equipment to be... managing equipment (including replacement equipment), whether acquired in whole or in part with grant funds... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Equipment. 105-71.132...

  4. 43 CFR 12.72 - Equipment.

    Science.gov (United States)

    2010-10-01

    ...) When acquiring replacement equipment, the grantee or subgrantee may use the equipment to be replaced as... equipment (including replacement equipment), whether acquired in whole or in part with grant funds, until... established to ensure the highest possible return. (e) Disposition. When original or replacement equipment...

  5. 1968 Listing of Swimming Pool Equipment.

    Science.gov (United States)

    National Sanitation Foundation, Ann Arbor, MI. Testing Lab.

    An up-to-date listing of swimming pool equipment including--(1) companies authorized to display the National Sanitation Foundation seal of approval, (2) equipment listed as meeting NSF swimming pool equipment standards relating to diatomite type filters, (3) equipment listed as meeting NSF swimming pool equipment standard relating to sand type…

  6. Performance monitoring of safeguards equipment

    International Nuclear Information System (INIS)

    Sirisena, K.; Peltoranta, M.; Goussarov, V.; Vodrazka, P.

    1999-01-01

    SGTCS is responsible for monitoring and reporting the performance of the SG equipment. Performance monitoring (PM) has been implemented in most important safeguards equipment operating unattended in nuclear facilities. Inspectors acquire equipment performance data in facilities. After inspection, the data package is submitted to SGTCS for processing and analysis. The performance data is used for identification of systems or components, which should be changed in the field and for identification of modules which, should be diagnosed at HQ in order to determine the cause of failure. Moreover, the performance data is used for preventive maintenance and spares distribution planning, and to provide statistics for official reports and management decision making. An important part of the performance monitoring is reporting. Equipment performance reports contain information about equipment inventory, utilization, failure types, failure distribution, and reliability. Trends in performance are given in graphical form in cases, where past data is available. Reliability estimates such as expected times between failures are provided. The automated reporting tools are obtainable through EMIS database application. (author)

  7. AVM branch vibration test equipment

    International Nuclear Information System (INIS)

    Anne, J.P.

    1995-01-01

    An inventory of the test equipment of the AVM Branch ''Acoustic and Vibratory Mechanics Analysis Methods'' group has been undertaken. The purpose of this inventory is to enable better acquaintance with the technical characteristics of the equipment, providing an accurate definition of their functionalities, ad to inform potential users of the possibilities and equipment available in this field. The report first summarizes the various experimental surveys conduced. Then, using the AVM equipment database to draw up an exhaustive list of available equipment, it provides a full-scope picture of the vibration measurement systems (sensors, conditioners and exciters) and data processing resources commonly used on industrial sites and in laboratories. A definition is also given of a mobile test unit, called 'shelter', and a test bench used for the testing and performance rating of the experimental analysis methods developed by the group. The report concludes with a description of two fixed installations: - the calibration bench ensuring the requisite quality level for the vibration measurement systems ; - the training bench, whereby know-how acquired in the field in the field of measurement and experimental analysis processes is made available to others. (author). 27 refs., 15 figs., 2 appends

  8. 78 FR 25916 - Authorization of Radiofrequency Equipment

    Science.gov (United States)

    2013-05-03

    ...] Authorization of Radiofrequency Equipment AGENCY: Federal Communications Commission. ACTION: Proposed rule... bodies, and measurement procedures used to determine RF equipment compliance. The Commission believes... Commission is responsible for an equipment authorization program for radiofrequency (RF) devices under part 2...

  9. Shiftable conveyor systems in open-cast mines in India

    Energy Technology Data Exchange (ETDEWEB)

    Noronha, H S; Patel, J C

    1984-12-01

    The materials handling and earthmoving arrangements are described at the Neyveli lignite mine in Tamil Nadu State, 200 km from Madras, India. The equipment used consists of shiftable conveyors, transfer feeders and drive stations.

  10. in Botswana

    African Journals Online (AJOL)

    seriane.camara

    2009-09-29

    Sep 29, 2009 ... They use explosives and heavy earth-moving equipment .... Given the zealous advocacy of the head of FUNAI to 'develop' Indian reserves, this ... land documentation efforts to aid taxation ensure that the poor and powerless.

  11. Another donation of computer equipment

    CERN Multimedia

    Anaïs Schaeffer

    2014-01-01

    On Thursday 27 February, CERN was pleased to donate computer equipment to a physics institute in the Philippines.   H.E. Leslie J. Baja and Rolf Heuer. Following donations of computer equipment to institutes in Morocco, Ghana, Bulgaria, Serbia and Egypt, CERN is to send 50 servers and 4 network switches to the National Institute of Physics at the University of the Philippines Diliman. CERN’s Director-General Rolf Heuer and the Ambassador of the Philippines to Switzerland and Lichtenstein, H.E. Leslie J. Baja, spoke of their enthusiasm for the project during an official ceremony. The equipment will be used for various high energy physics research programmes in the Philippines and for the University’s development of digital resources for science.

  12. Waste Electrical and Electronic Equipment

    DEFF Research Database (Denmark)

    Bigum, Marianne Kristine Kjærgaard; Christensen, Thomas Højlund

    2011-01-01

    Waste electrical and electronic equipment (WEEE) is one of the fastest growing special waste types with an estimated growth of 3–5% per year (Cui and Forssberg, 2003). WEEE is a very heterogeneous waste type that contains many compounds that are considered to be harmful to both humans and the env......Waste electrical and electronic equipment (WEEE) is one of the fastest growing special waste types with an estimated growth of 3–5% per year (Cui and Forssberg, 2003). WEEE is a very heterogeneous waste type that contains many compounds that are considered to be harmful to both humans...

  13. The development of superconducting equipment

    CERN Document Server

    Ueda, T; Hiue, H

    2003-01-01

    Fuji Electric has been developing various types of superconducting equipment for over a quarter of a century. This paper describes the development results achieved for superconducting equipment and especially focuses on large-capacity current leads and superconducting transmission systems, the development of which is being promoted for application to the field of nuclear fusion. High temperature superconductor (HTS) is becoming the mainstream in the field of superconductivity, and the HTS floating coil and conduction-cooled HTS transformed are also introduced as recent developments for devices that utilize this technology. (author)

  14. Mechanical (turbines and auxiliary equipment)

    CERN Document Server

    Sherry, A; Cruddace, AE

    2013-01-01

    Modern Power Station Practice, Volume 3: Mechanical (Turbines and Auxiliary Equipment) focuses on the development of turbines and auxiliary equipment used in power stations in Great Britain. Topics covered include thermodynamics and steam turbine theory; turbine auxiliary systems such as lubrication systems, feed water heating systems, and the condenser and cooling water plants. Miscellaneous station services, and pipework in power plants are also described. This book is comprised of five chapters and begins with an overview of thermodynamics and steam turbine theory, paying particular attenti

  15. Damage limits of accelerator equipment

    CERN Document Server

    Rosell, Gemma

    2014-01-01

    Beam losses occur in particle accelerators for various reasons. The effect of lost particles on accelerator equipment becomes more severe with the increasing energies and intensities. The present study is focused on the damage potential of the proton beam as a function of particle energy and beam size. Injection and extraction energies of different accelerators at CERN were considered.

  16. Pocket dictionary of laboratory equipment

    International Nuclear Information System (INIS)

    Junge, H.D.

    1987-01-01

    This pocket dictionary contains the 2500 most common terms for scientific and technical equipment in chemical laboratories. It is a useful tool for those who are used to communicating in German and English, but have to learn the special terminology in this field. (orig.) [de

  17. Using Gaming Equipment to Teach

    Science.gov (United States)

    Curriculum Review, 2009

    2009-01-01

    Gaming equipment (such as Nintendo's Wii[TM]) is making its way to schools and classrooms. However, most of the discussion regarding how to use this technology and integrate it into lesson plans is happening in blogs on the Internet. An advocate of interactive media in the classroom, Dr. Dawn Hawkins, a faculty member for the Art Institute of…

  18. Isotope-equipped measuring instruments

    International Nuclear Information System (INIS)

    Miyagawa, Kazuo; Amano, Hiroshi

    1980-01-01

    In the steel industry, though the investment in isotope-equipped measuring instruments is small as compared with that in machinery, they play important role in the moisture measurement in sintering and blast furnaces, the thickness measurement in rolling process and others in automatic control systems. The economic aspect of the isotope-equipped measuring instruments is described on the basis of the practices in Kimitsu Works of Nippon Steel Corporation: distribution of such instruments, evaluation of economic effects, usefulness evaluation in view of raising the accuracy, and usefulness evaluation viewed from the failure of the isotope instruments. The evaluation of economic effects was made under the premise that the isotope-equipped measuring instruments are not employed. Then, the effects of raising the accuracy are evaluated for a γ-ray plate thickness gauge and a neutron moisture gauge for coke in a blast furnace. Finally, the usefulness was evaluated, assuming possible failure of the isotope-equipped measuring instruments. (J.P.N.)

  19. Hydraulic turbines and auxiliary equipment

    Energy Technology Data Exchange (ETDEWEB)

    Luo Gaorong [Organization of the United Nations, Beijing (China). International Centre of Small Hydroelectric Power Plants

    1995-07-01

    This document presents a general overview on hydraulic turbines and auxiliary equipment, emphasizing the turbine classification, in accordance with the different types of turbines, standard turbine series in China, turbine selection based on the basic data required for the preliminary design, general hill model curves, chart of turbine series and the arrangement of application for hydraulic turbines, hydraulic turbine testing, and speed regulating device.

  20. Alternative Fuels Data Center: Biodiesel Equipment Options

    Science.gov (United States)

    Equipment Options to someone by E-mail Share Alternative Fuels Data Center: Biodiesel Equipment Options on Facebook Tweet about Alternative Fuels Data Center: Biodiesel Equipment Options on Twitter Bookmark Alternative Fuels Data Center: Biodiesel Equipment Options on Google Bookmark Alternative Fuels

  1. 40 CFR 792.61 - Equipment design.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 31 2010-07-01 2010-07-01 true Equipment design. 792.61 Section 792.61...) GOOD LABORATORY PRACTICE STANDARDS Equipment § 792.61 Equipment design. Equipment used in the... of appropriate design and adequate capacity to function according to the protocol and shall be...

  2. 40 CFR 160.61 - Equipment design.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 23 2010-07-01 2010-07-01 false Equipment design. 160.61 Section 160... LABORATORY PRACTICE STANDARDS Equipment § 160.61 Equipment design. Equipment used in the generation... appropriate design and adequate capacity to function according to the protocol and shall be suitably located...

  3. 21 CFR 58.61 - Equipment design.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 1 2010-04-01 2010-04-01 false Equipment design. 58.61 Section 58.61 Food and... PRACTICE FOR NONCLINICAL LABORATORY STUDIES Equipment § 58.61 Equipment design. Equipment used in the... of appropriate design and adequate capacity to function according to the protocol and shall be...

  4. 34 CFR 74.34 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... as program income. (e) When acquiring replacement equipment, the recipient may use the equipment to... replacement equipment subject to the approval of the Secretary. (f) The recipient's property management... 34 Education 1 2010-07-01 2010-07-01 false Equipment. 74.34 Section 74.34 Education Office of the...

  5. 20 CFR 437.32 - Equipment.

    Science.gov (United States)

    2010-04-01

    ... contemplated by Federal statute. (4) When acquiring replacement equipment, the grantee or subgrantee may use.... Procedures for managing equipment (including replacement equipment), whether acquired in whole or in part... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false Equipment. 437.32 Section 437.32 Employees...

  6. 45 CFR 2541.320 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... replacement equipment, the grantee or subgrantee may use the equipment to be replaced as a trade-in or sell... replacement equipment), whether acquired in whole or in part with grant funds, until disposition takes place... ensure the highest possible return. (e) Disposition. When original or replacement equipment acquired...

  7. 45 CFR 1174.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... contemplated by Federal statute. (4) When acquiring replacement equipment, the grantee or subgrantee may use... requirements. Procedures for managing equipment (including replacement equipment), whether acquired in whole or... original or replacement equipment acquired under a grant or subgrant is no longer needed for the original...

  8. 45 CFR 1157.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... contemplated by Federal statute. (4) When acquiring replacement equipment, the grantee or subgrantee may use... requirements. Procedures for managing equipment (including replacement equipment), whether acquired in whole or... original or replacement equipment acquired under a grant or subgrant is no longer needed for the original...

  9. The Cost of Maintaining Educational Communications Equipment.

    Science.gov (United States)

    Humphrey, David A.

    Tentative formulas for calculating the cost of maintaining educational communications equipment are proposed. The formulas are based on a survey of campuses of the State University of New York. The survey analyzed the types of equipment to be maintained, types of maintenance, who uses the equipment, who services the equipment, and the cost…

  10. [Equipment and technology in robotics].

    Science.gov (United States)

    Murphy, Declan; Challacombe, Ben; Nedas, Tim; Elhage, Oussama; Althoefer, Kaspar; Seneviratne, Lakmal; Dasgupta, Prokar

    2007-05-01

    We review the evolution and current status of robotic equipment and technology in urology. We also describe future developments in the key areas of virtual reality simulation, mechatronics and nanorobotics. The history of robotic technology is reviewed and put into the context of current systems. Experts in the associated fields of nanorobotics, mechatronics and virtual reality simulation simulation review the important future developments in these areas.

  11. Remote handling equipment for SNS

    International Nuclear Information System (INIS)

    Poulten, B.H.

    1983-01-01

    This report gives information on the areas of the SNS, facility which become highly radioactive preventing hands-on maintenance. Levels of activity are sufficiently high in the Target Station Area of the SNS, especially under fault conditions, to warrant reactor technology to be used in the design of the water, drainage and ventilation systems. These problems, together with the type of remote handling equipment required in the SNS, are discussed

  12. Margins related to equipment design

    International Nuclear Information System (INIS)

    Devos, J.

    1994-01-01

    Safety margins related to design of reactor equipment are defined according to safety regulations. Advanced best estimate methods are proposed including some examples which were computed and compared to experimental results. Best estimate methods require greater computation effort and more material data but give better variable accuracy and need careful experimental validation. Simplified methods compared to the previous are less sensitive to material data, sometimes are more accurate but very long to elaborate

  13. Temperature radiation measuring equipment. Temperaturstrahlungsmessgeraet

    Energy Technology Data Exchange (ETDEWEB)

    Lotzer, W

    1981-01-22

    The invention is concerned with a temperature radiation measuring equipment for non-contact temperature measurement by the light intensity variation method, with a photoelectric resistance as the measuring element. By having a circuit with a transistor, the 'dark resistance' occurring in the course of time is compensated for and thus gives a genuine reading (ie. the voltage drop across the photoelectric resistance remains constant).

  14. CERN computing equipment for Senegal

    CERN Multimedia

    Anaïs Schaeffer

    2014-01-01

    On 26 May, CERN once again had the honour of donating computing equipment to a foreign institute.   This time, around 100 servers and five network hubs were sent to Senegal, making it the seventh country, after Morocco, Ghana, Bulgaria, Serbia, Egypt and the Philippines, to receive a donation of computing equipment from the Organization. The official ceremony was held at CERN on 26 May in the presence of the Director-General, Rolf Heuer, and Senegal's ambassador to Geneva, Fodé Seck, who both expressed their enthusiasm for the project. The equipment is intended for Cheikh Anta Diop University (UCAD) in Dakar and will be of particular use to students attending the African School of Fundamental Physics and its Applications (ASP 2014) taking place from 3 to 23 August, for which CERN is a partner. The ASP allows a large number of African students to hone their skills in high-energy physics and to forge professional links with fellow physicists in Africa and Europe. ...

  15. JCE Online: Equipment Buyers Guide

    Science.gov (United States)

    Holmes, Jon L.

    1999-01-01

    The Equipment Buyers Guide was edited by Jo Rita Jordan. The new Equipment Buyers Guide, bound into the back of this issue, is also a new resource of JCE Internet. This resource provides an online source for the information contained in the printed guide. Placing this information online allows us to regularly update it and to provide live links to the suppliers' WWW sites. The organization of the online version parallels that of the print version. There is an alphabetical list of suppliers and a categorical listing. Links to these lists are provided on every page in the left-hand navigation bar. To quickly find information about a particular supplier, you click Supplier List, click the letter that begins the supplier's name, and scroll through the list to find the supplier. To find which suppliers provide a particular type of instrument or equipment, use the Categories link; click the category of the equipment you are looking for and then click the link to a supplier. You will then be taken to an alphabetical supplier listing page where you can scroll until you find the particular supplier of the item for which you are looking. Once you have found a supplier, the online Equipment Buyers Guide gives you the traditional contact information. But in addition, you also get one-click access to the WWW sites of the suppliers that have them. Depending on the site, you should be able to find information about the items that you seek and may even be able to order the items online! We think that you will find the online version of the Equipment Buyers Guide useful. To make it more useful, please send your suggestions, any errors or omissions you find, and any additional categories to the editor at jjordan@world.std.com The online Equipment Buyers Guide can be found at JCE Online at http://JChemEd.chem.wisc.edu/JCEWWW/Resources/EBG/ JCE Online in '99 JCE Online is your online source of "all things JCE". In order to provide you with an even more useful online resource, JCE

  16. Division of Scientific Equipment - Overview

    International Nuclear Information System (INIS)

    Halik, J.

    2002-01-01

    Full text: The Scientific Equipment Division consists of the Design Group and the Mechanical Workshop. The activity of the Division includes the following: * designs of devices and equipment for experiments in physics; their mechanical construction and assembly. In particular, these are vacuum chambers and installations for HV and UHV;* maintenance and upgrading of the existing installations and equipment in our Institute; * participation of our engineers and technicians in design works, equipment assembly and maintenance for experiments in foreign laboratories. The Design Group is equipped with PC-computers and AutoCAD graphic software (release 2000 and Mechanical Desktop 4.0) and an A0 plotter, which allow us to make drawings and 2- and 3-dimensional mechanical documentation to the world standards. The Mechanical Workshop offers a wide range of machining and treatment methods with satisfactory tolerances and surface quality. They include: * turning - cylindrical elements of a length up to 2000 mm and a diameter up to 400 mm, and also disc type elements of a diameter up to 600 mm and a length not exceeding 300 mm, * milling - elements of length up to 1000 mm and gear wheels of diameter up to 300 mm, * grinding - flat surfaces of dimensions up to 300 mm x 1000 mm and cylindrical elements of a diameter up to 200 mm and a length up to 800 mm, * drilling - holes of a diameter up to 50 mm, * welding - electrical and gas welding, including TIG vacuum-tight welding, * soft and hard soldering, * mechanical works including precision engineering, * plastics treatment - machining and polishing using diamond milling, modelling, lamination of various shapes and materials, including plexiglas, scintillators and light-guides, * painting - paint spraying with possibility of using furnace-fired drier of internal dimensions of 800 mm x 800 mm x 800 mm. Our workshop is equipped with the CNC milling machine which can be used for machining of work pieces up to 500 kg. The machine

  17. Used energy-related laboratory equipment grant program for institutions of higher learning. Eligible equipment catalog

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-01

    This is a listing of energy related equipment available through the Energy-Related Laboratory Equipment Grant Program which grants used equipment to institutions of higher education for energy-related research. Information included is an overview of the program, how to apply for a grant of equipment, eligibility requirements, types of equipment available, and the costs for the institution.

  18. Data center equipment location and monitoring system

    DEFF Research Database (Denmark)

    2011-01-01

    A data center equipment location system includes both hardware and software to provide for location, monitoring, security and identification of servers and other equipment in equipment racks. The system provides a wired alternative to the wireless RFID tag system by using electronic ID tags...... connected to each piece of equipment, each electronic ID tag connected directly by wires to a equipment rack controller on the equipment rack. The equipment rack controllers then link over a local area network to a central control computer. The central control computer provides an operator interface......, and runs a software application program that communicates with the equipment rack controllers. The software application program of the central control computer stores IDs of the equipment rack controllers and each of its connected electronic ID tags in a database.; The software application program...

  19. Establishment for Nuclear Equipment: Overview

    International Nuclear Information System (INIS)

    Pracz, J.

    2001-01-01

    Full text: The activity of ZdAJ in 2000 was focused on realisation of the Government-Ordered Project - 6/15 MeV Accelerator. The realisation was accomplished in two stages: - stage I should result in deriving principal operational parameters of the accelerator - stage 2 will result in full implementation of the control system providing optimum control of the equipment and automatic maintaining of its parameters. Within the frames of the first stage, a klystron modulator panel was finished and the design documentation of the mechanical supporting structure, the arm, accelerating structure, collimator and control panel were advanced. Manufacturing of the above sub-units in the workshop has started. In the frames of the Specific Project of the State Committee for Scientific Research, the improvement of Neptun lOPC accelerator was undertaken. The read-out of the monitor dose with atmospheric pressure and ambient temperature compensation has been introduced. New filters for equalising the photon and electron beam and new wedge filters have been designed. Changes in programming have been introduced, which improve the patient's safety by eliminating possible personnel errors and increase the accuracy of radiation fields read-out. In 2000 ZdAJ progressed in development of the Quality System conforming EN-ISO 9001 Standard by including the provisions of EN 46001 Standard. The Standard EN 46001: ''Quality Systems - Medical Equipment''. Detailed requirements related to application of EN ISO 9001 is an European Quality Standard extending the provisions of EN ISO 9001 Standard over the manufacturers of medical equipment. (author)

  20. Reactor vital equipment determination techniques

    International Nuclear Information System (INIS)

    Bott, T.F.; Thomas, W.S.

    1983-01-01

    The Reactor Vital Equipment Determination Techniques program at the Los Alamos National Laboratory is discussed. The purpose of the program is to provide the Nuclear Regulatory Commission (NRC) with technical support in identifying vital areas at nuclear power plants using a fault-tree technique. A reexamination of some system modeling assumptions is being performed for the Vital Area Analysis Program. A short description of the vital area analysis and supporting research on modeling assumptions is presented. Perceptions of program modifications based on the research are outlined, and the status of high-priority research topics is discussed

  1. The replace repair decision for heavy equipment.

    Science.gov (United States)

    2004-01-01

    The fleet of equipment operated by the Virginia Department of Transportation (VDOT) constitutes a large investment, on the order of half a billion dollars. A means of identifying earlier and more accurately those pieces of equipment whose timely repl...

  2. Proceedings of FED remote maintenance equipment workshop

    International Nuclear Information System (INIS)

    Sager, P.; Garin, J.; Hager, E.R.; Spampinato, P.T.; Tobias, D.; Young, N.

    1981-11-01

    A workshop was convened in two sessions in January and March 1981, on the remote maintenance equipment for the Fusion Engineering Device (FED). The objectives of the first session were to familiarize the participants with the status of the design of the FED and to develop a remote maintenance equipment list for the FED. The objective of the second session was to have the participants present design concepts for the equipment which had been identified in the first session. The equipment list was developed for general purpose and special purpose equipment. The general purpose equipment was categorized as manipulators and other, while the special purpose equipment was subdivided according to the reactor subsystem it serviced: electrical, magnetic, and nuclear. Both mobile and fixed base manipulators were identified. Handling machines were identified as the major requirement for special purpose equipment

  3. Musical Sound, Instruments, and Equipment

    Science.gov (United States)

    Photinos, Panos

    2017-12-01

    'Musical Sound, Instruments, and Equipment' offers a basic understanding of sound, musical instruments and music equipment, geared towards a general audience and non-science majors. The book begins with an introduction of the fundamental properties of sound waves, and the perception of the characteristics of sound. The relation between intensity and loudness, and the relation between frequency and pitch are discussed. The basics of propagation of sound waves, and the interaction of sound waves with objects and structures of various sizes are introduced. Standing waves, harmonics and resonance are explained in simple terms, using graphics that provide a visual understanding. The development is focused on musical instruments and acoustics. The construction of musical scales and the frequency relations are reviewed and applied in the description of musical instruments. The frequency spectrum of selected instruments is explored using freely available sound analysis software. Sound amplification and sound recording, including analog and digital approaches, are discussed in two separate chapters. The book concludes with a chapter on acoustics, the physical factors that affect the quality of the music experience, and practical ways to improve the acoustics at home or small recording studios. A brief technical section is provided at the end of each chapter, where the interested reader can find the relevant physics and sample calculations. These quantitative sections can be skipped without affecting the comprehension of the basic material. Questions are provided to test the reader's understanding of the material. Answers are given in the appendix.

  4. Concerning equipment procurement for NPPs

    International Nuclear Information System (INIS)

    Pana, N.

    2002-01-01

    After a stagnation in investments for nuclear power which extended over a period of 10-15 years, assessments done by energy forecast institutes, as well as, evaluations by UE institutions, OECD, and DOE (USA) point to the conclusion solid and argued that the electric energy of nuclear origin will record a new boost beginning probably with the year 2005. Particular efforts were concentrated upon improving the performances of existing plants and, on the other hand, towards new, evolutionary concepts in nuclear engineering. Advanced equipment for nuclear reactors and plants resulted and were already implemented. In Europe construction of both advanced PWR and BWR type reactors are underway. The paper consider the issues of Romanian nuclear power and presents the prospects for advanced CANDU reactors in connection with the Romania's infrastructure and necessities. The problem of modernizing the equipment and components for NPP is discussed in the context of financing and investment conditions. In conclusion, the share of nuclear power in Romania is expected to rise in order to compensate the decline in fossil fuel thermal power and to better solve the environmental issues

  5. Equipment available for automating rig operations

    International Nuclear Information System (INIS)

    McNair, W.L.

    1990-01-01

    Several manufacturers are producing automated rig equipment, from complete systems to individual functions for existing drilling rigs. Significant improvements in well site time, costs of operations, and improved drilling performance have led drilling contractors to install this equipment on their rigs. This paper details some of the equipment available for automating rigs

  6. 13 CFR 143.32 - Equipment.

    Science.gov (United States)

    2010-01-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Equipment. 143.32 Section 143.32...

  7. 32 CFR 33.32 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 32 National Defense 1 2010-07-01 2010-07-01 false Equipment. 33.32 Section 33.32 National Defense...

  8. 45 CFR 92.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 45 Public Welfare 1 2010-10-01 2010-10-01 false Equipment. 92.32 Section 92.32 Public Welfare...

  9. 40 CFR 31.32 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Equipment. 31.32 Section 31.32...

  10. 14 CFR 1273.32 - Equipment.

    Science.gov (United States)

    2010-01-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Equipment. 1273.32 Section 1273.32...

  11. 29 CFR 1470.32 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 29 Labor 4 2010-07-01 2010-07-01 false Equipment. 1470.32 Section 1470.32 Labor Regulations...

  12. 15 CFR 24.32 - Equipment.

    Science.gov (United States)

    2010-01-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 15 Commerce and Foreign Trade 1 2010-01-01 2010-01-01 false Equipment. 24.32 Section 24.32...

  13. 38 CFR 43.32 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 38 Pensions, Bonuses, and Veterans' Relief 2 2010-07-01 2010-07-01 false Equipment. 43.32 Section...

  14. 30 CFR 250.602 - Equipment movement.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Equipment movement. 250.602 Section 250.602... OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Well-Workover Operations § 250.602 Equipment movement. The movement of well-workover rigs and related equipment on and off a platform or from well to well on...

  15. 30 CFR 250.502 - Equipment movement.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Equipment movement. 250.502 Section 250.502... OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Well-Completion Operations § 250.502 Equipment movement. The movement of well-completion rigs and related equipment on and off a platform or from well to well...

  16. 46 CFR 121.220 - Cooking equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Cooking equipment. 121.220 Section 121.220 Shipping... SYSTEMS AND EQUIPMENT Cooking and Heating § 121.220 Cooking equipment. (a) Doors on a cooking appliance... cooking appliance must be installed to prevent movement in heavy seas. (c) For a grill or similar type of...

  17. 46 CFR 184.220 - Cooking equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Cooking equipment. 184.220 Section 184.220 Shipping...) VESSEL CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Cooking and Heating § 184.220 Cooking equipment. (a) Doors on a cooking appliance must be provided with hinges and locking devices to prevent...

  18. Special equipment for etching nitrocellulose film

    International Nuclear Information System (INIS)

    Domanus, J.C.

    1983-08-01

    Nitrocellulose film and converter screens used for neutron radiography are described. Difficulties in visualization of radiographs on those films are mentioned. Because there is no equipment for etching nitrocellulose film available on the market Risoe has designed and produced such equipment at an estimated cost of Dkr. 15,000. Design criteria for this equipment are given and its performance described

  19. Developing equipment for AGR remote visual inspection

    International Nuclear Information System (INIS)

    James, P.W.; Walton, P.J.

    1985-01-01

    The Remote Inspection Group is part of the CEGB's Generation Development and Construction Division, and has responsibility for the design, development, procurement, testing and setting to work of the equipment provided to carry out routine remote visual inspections of its AGRs. This equipment includes both the viewing devices and the necessary placement equipment. (author)

  20. 46 CFR 121.210 - Heating equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Heating equipment. 121.210 Section 121.210 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS CARRYING MORE THAN 150... SYSTEMS AND EQUIPMENT Cooking and Heating § 121.210 Heating equipment. (a) Each heater must be so...

  1. 46 CFR 184.210 - Heating equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Heating equipment. 184.210 Section 184.210 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) VESSEL CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Cooking and Heating § 184.210 Heating equipment...

  2. Sample-related peripheral equipment at IPNS

    International Nuclear Information System (INIS)

    Bohringer, D.E.; Crawford, R.K.

    1985-01-01

    This paper describes samples environment equipment provided by IPNS to visiting users and staff scientists. Of the twelve horizontal neutron beam stations, (ten now operational, two under construction) all use one or more form of such support equipment. An in-house support group devotes a significant fraction of its time to development, calibration, and maintenance of this equipment

  3. 14 CFR 121.605 - Airplane equipment.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Airplane equipment. 121.605 Section 121.605..., FLAG, AND SUPPLEMENTAL OPERATIONS Dispatching and Flight Release Rules § 121.605 Airplane equipment. No person may dispatch or release an airplane unless it is airworthy and is equipped as prescribed in § 121...

  4. Fire prevention and protection for trackless equipment

    Energy Technology Data Exchange (ETDEWEB)

    Burger, A.J.

    1988-10-01

    With the increased use of trackless diesel and electrical equipment underground, the fire danger associated with this equipment has increased. The need for adequate fire prevention and protection on all aspects of trackless mechanised mining must be taken into consideration. This paper describes briefly the causes of fires on trackless equipment and the precautions taken to reduce the risk of ignition. 1 tab.

  5. Load Bearing Equipment for Bone and Muscle

    Science.gov (United States)

    Shackelford, Linda; Griffith, Bryan

    2015-01-01

    Resistance exercise on ISS has proven effective in maintaining bone mineral density and muscle mass. Exploration missions require exercise with similar high loads using equipment with less mass and volume and greater safety and reliability than resistance exercise equipment used on ISS (iRED, ARED, FWED). Load Bearing Equipment (LBE) uses each exercising person to create and control the load to the partner.

  6. Establishment for Nuclear Equipment -Overview

    International Nuclear Information System (INIS)

    Pracz, J.

    2006-01-01

    Research and development works conducted in the Establishment for Nuclear Equipment (ZdAJ) were focused around 3 subject areas: an accelerator for cancer treatment, therapeutical tables, systems and methods for controlling objects that cross international borders. The new, medium energy accelerator for cancer therapy cases is being designed in the Establishment for several years. In 2005 progress was achieved. A physical part, containing an electron beam has been completed and the parameters of that beam make it useful for therapeutical purposes. Consequently, the work on designing and testing of beam control systems, ensuring its high stability, repetition of irradiation parameters and accuracy of dosage have been started. Results of these tests make it very probable that 2006 will be the final year of scientific works and in 2007 the new apparatus will be ready for sales. Therapeutical tables have become a leading product of ZdAJ IPJ. Their technical parameters, reliability and universality in uses are appreciated by many customers of ZdAJ. In 2005, the table Polkam 16 was registered by the national Office for Registration of Medical Equipment as the first product of ZdAJ that meets all technical and formal requirements of the safety mark CE. This allows sales of the product on the market of the European Union. The research and development part of designing a therapeutical table for uses in the total body irradiation technique was also concluded in 2005. After the September 11 terrorist attacks on WTC a matter of controlling international borders have become a priority for many countries. In 2005 in ZdAJ IPJ, we conducted many preliminary calculations and experiments analyzing systems of irradiation sources, both photon and neutron as well as systems of detection and designing of signals triggered by controlling objects crossing the border. The results so far have enabled us to formulate a research project which has been positively evaluated by experts and found

  7. Communication equipment radiation resistance ensurance

    International Nuclear Information System (INIS)

    Myrova, L.O.; Chelizhenko, A.Z.

    1983-01-01

    A review of works on radiation resistance of electronic equipment (epsilon epsilon) for 15 years is presented. The effect of ionizing radiation appearing as a result of nuclear explosions in nuclear facilities and in outerspace on epsilon epsilon has been considered. Types of radiation effects in epsilon epsilon, radiation effect on semiconductor devices and integrated circUits, types of epsilon epsilon failures, as well as the procass of radiation-resistant epsilon epsilon designing and selection of its main parameters have been described. The methods of epsilon epsilon flowsheet optimization, application of mathematical simulation and peculiarities of ensurance of epsilon epsilon radiation resistance of communication systems are considered. Peculiarities of designing of radiation-resistant quartz generators, secondary power supply sources and amplifiers are discussed

  8. Purex: process and equipment performance

    International Nuclear Information System (INIS)

    Orth, D.A.

    1986-01-01

    The Purex process is the solvent extraction system that uses tributyl phosphate as the extractant for separating uranium and plutonium from irradiated reactor fuels. Since the first flowsheet was proposed at Oak Ridge National Laboratory in 1950, the process has endured for over 30 years with only minor modifications. The spread of the technology was rapid, and worldwide use or research on Purex-type processes was reported by the time of the 1955 Geneva Conference. The overall performance of the process has been so good that there are no serious contenders for replacing it soon. This paper presents: process description; equipment performance (mixer-settlers, pulse columns, rapid contactors); fission product decontamination; solvent effects (solvent degradation products); and partitioning of uranium and plutonium

  9. Automation of a thermogravimetric equipment

    International Nuclear Information System (INIS)

    Mussio, L.; Castiglioni, J.; Diano, W.

    1987-01-01

    A low cost automation of some instruments by means of simple electronic circuits and a microcomputer Apple IIe. type is discussed. The electronic circuits described are: a) a position detector including phototransistors connected as differential amplifier; b) a current source that, using the error signal of the position detector, changes the current through the coil of an electromagnetic balance to restore its zero position; c) a proportional temperature controller, zero volt switching to drive a furnace to a desired temperature; d) an interface temperature regulator-microcomputer to control the temperature regulator by software; e) a multiplexer for an analog input of a commercial interface. Those circuits are applied in a thermogravimetric equipment used also for vapours adsorption. A program in block diagram form is included and is able to record change of mass, time, furnace temperature and to drive the temperature regulator in order to have the heating rates or the temperature plateaux needed for the experiment. (author) [pt

  10. Establishment for Nuclear Equipment: Overview

    International Nuclear Information System (INIS)

    Pracz, J.

    2000-01-01

    Full text: The main objective of the activity of the Establishment for Nuclear Equipment (ZdAJ) in 1999 was to obtain the ISO 9001 certificate. Work on this problem has been successfully completed. The changes introduced in agreement with requirements of ISO in supervising the construction, manufacturing and servicing eliminate possible deficiencies of our products and will pay in the future. Two new important ventures have been undertaken: design of an accelerator with two photon energies and a reconstruction of simulator directed towards better geometrical parameters. The completion of the improvements in accelerator is foreseen for the year 2002. The changes comprise almost all sub-assemblies of the device. The modernized simulator will be installed in the hospital already in the year 2000 - the ameliorations concern mainly the arm of the apparatus, collimator, driving gears and control system. Of course - apart from this, the routine production activity of the Establishment was continued in 1999. (author)

  11. Protective equipment use among female rugby players.

    Science.gov (United States)

    Comstock, R Dawn; Fields, Sarah K; Knox, Christy L

    2005-07-01

    Our objective was to assess the prevalence of protective equipment use and the motivation for using protective equipment among a sample of US female rugby players. We surveyed a convenience sample of 234 current US female rugby players from 14 teams participating in a US women's rugby tournament, obtaining self-reported demographic, rugby exposure, and protective equipment use information. Mouthguards were the most commonly used piece of protective equipment: 90.8% of players reported having always worn a mouthguard while playing or practicing rugby within their most recent 3 months of play. Fewer than 15% of players reported having always worn other types of protective equipment. Equipment use varied by playing position. Whereas over 80% of players in all other positions always wore a mouthguard, 66.7% of scrum halves reported always wearing one. Both backs and forwards reported wearing shoulder pads, but only forwards reported always wearing padded headgear. Mouthguards, padded headgear, and shoulder pads were worn "to prevent injury," whereas ankle braces, neoprene sleeves, and athletic tape on joints were worn "to protect a current/recent injury." This is the first study of female rugby players to assess the prevalence of protective equipment use by playing position and the motivation for using protective equipment. With the exception of mouthguards, US female rugby players infrequently use protective equipment. Protective equipment use varies by playing position. Some types of protective equipment appear to be used as primary prevention mechanisms, whereas others are used as secondary or tertiary prevention mechanisms.

  12. Changing nature of equipment and parts qualification

    International Nuclear Information System (INIS)

    Bucci, R.M.

    1988-01-01

    Ideally, the original supplier of a piece of nuclear safety-related equipment has performed a qualification program and will continue to support that equipment throughout the lifetime of the nuclear power plants in which in equipment is installed. The supplier's nuclear quality assurance program will be maintained and he will continue to offer all necessary replacement parts. These parts will be identical to the original parts, certified to the original purchase order requirements, and the parts will be offered at competitive prices. Due to the changing nature of the nuclear plant equipment market, however, one or more of those ideal features are frequently unavailable when safety-related replacement equipment or parts are required. Thus, the process of equipment and parts qualification has had to adjust in order to ensure obtaining qualified replacements when needed. This paper presents some new directions taken in the qualification of replacement equipment and parts to meet changes in the marketplace

  13. Free-world microelectronic manufacturing equipment

    Science.gov (United States)

    Kilby, J. S.; Arnold, W. H.; Booth, W. T.; Cunningham, J. A.; Hutcheson, J. D.; Owen, R. W.; Runyan, W. R.; McKenney, Barbara L.; McGrain, Moira; Taub, Renee G.

    1988-12-01

    Equipment is examined and evaluated for the manufacture of microelectronic integrated circuit devices and sources for that equipment within the Free World. Equipment suitable for the following are examined: single-crystal silicon slice manufacturing and processing; required lithographic processes; wafer processing; device packaging; and test of digital integrated circuits. Availability of the equipment is also discussed, now and in the near future. Very adequate equipment for most stages of the integrated circuit manufacturing process is available from several sources, in different countries, although the best and most widely used versions of most manufacturing equipment are made in the United States or Japan. There is also an active market in used equipment, suitable for manufacture of capable integrated circuits with performance somewhat short of the present state of the art.

  14. 9 CFR 590.502 - Equipment and utensils; PCB-containing equipment.

    Science.gov (United States)

    2010-01-01

    ... Sanitary Standards and accepted practices currently in effect for such equipment. (c) New or replacement equipment or machinery (including any replacement parts) brought onto the premises of any official plant... equipment and machinery, and any replacement parts for such equipment and machinery. Totally enclosed...

  15. Quality assurance for radiodiagnostic equipment in Uruguay

    International Nuclear Information System (INIS)

    Cotelo, Elena D.

    2001-01-01

    Since Uruguay did not have an study on X-ray equipment, students of Radiation Protection course (RP) made this field work throughout the country. The objective is to obtain information on the number and kind of X-ray radiodiagnostic equipment. Some of the results are: there are 666 radiodiagnostic equipment. The ratio of population to equipment is 4.515 to 1 in the capital and the mean rate in the rest of the country is 4.383 to one, with a minimum of 1.707 and a maximum of 8.220. The Public Health Ministry (MSP) and the Instituciones de Asistencia Medica Colectiva (a kind of private heath assurance) (IAMC) have less equipment in the capital than in the rest of the country. The 37% of the capital population receives assistance through the IAMC , with a 42.5 % of the equipment. Uruguay except the capital has 18 districts and 17 computed tomography equipment, from which only 3 belong to the MSP. Five districts do not have any. In Montevideo, there are 11.500 females over forty years of age per X-ray mammography equipment, and this relation in the rest of the country is 13.900. There are 21 X-ray Interventional radiology equipment, 16 of them are in the capital. Is from relating the radiodiagnostic equipment, the population and the procedures, that quality assistance indicators emerge. This owns high importance on the way to create a RP National Programme. (author)

  16. Maintenance program guidelines for programmatic equipment

    International Nuclear Information System (INIS)

    1994-11-01

    The Division Directors at Lawrence Berkeley Laboratory are responsible for implementing a maintenance program for research equipment (also referred to as programmatic equipment) assigned to them. The program must allow maintenance to be accomplished in a manner that promotes operational safety, environmental protection and compliance, and cost effectiveness; that preserves the intended functions of the facilities and equipment; and that supports the programmatic mission of the Laboratory. Programmatic equipment -- such as accelerators, lasers, radiation detection equipment, and glove boxes -- is dedicated specifically to research. Installed equipment, by contrast, includes the mechanical and electrical systems installed as part of basic building construction, equipment essential to the normal functioning of the facility and its intended use. Examples of installed equipment are heating, ventilating, and air conditioning systems; elevators; and communications systems. The LBL Operating and Assurance Program Plan (PUB-3111, Revision 4) requires that a maintenance program be prepared for programmatic equipment and defines the basic maintenance program elements. Such a program of regular, documented maintenance is vital to the safety and quality of research activities. As a part of that support, this document offers guidance to Laboratory organizations for developing their maintenance programs. It clarifies the maintenance requirements of the Operating and Assurance Program (OAP) and presents an approach that, while not the only possibility, can be expected to produce an effective maintenance program for research equipment belonging to the Laboratory's organizations

  17. Inspection device for buried equipment

    International Nuclear Information System (INIS)

    Hanawa, Jun.

    1994-01-01

    In an inspection device for a buried equipment, a rail is suspended at the upper portion of a vessel of a pit-vessel type pump buried in a plant building floor, and a truck movable vertical in the vessel along the rail, and an ultrasonic wave probe contained in the truck and urged to the vessel by an electromagnet are disposed. In addition, an elevator moving vertically along a shaft is disposed, and an arm having the ultrasonic probe disposed at the end portion and driven by a piston are disposed to the elevator. The ultrasonic wave probe moves vertically together with the truck along the rail in the vessel while being urged to the vessel by the electromagnet to inspect and measure the state at the inner and outer surfaces of the vessel. Further, the length of the arm is controlled so as to set a predetermined distance between the ultrasonic wave probe and the vessel. Subsequently, the elevator is moved vertically along a shaft passing through a shaft hole of a mount, and the shaft is rotated thereby enabling to inspect and measure the state of the inner and outer surfaces of the vessel. (N.H.)

  18. Equipment used in nuclear medicine

    International Nuclear Information System (INIS)

    Das, B.K.; Noreen Norfaraheen Lee Abdullah

    2012-01-01

    Detection of radiation is the common purpose of all equipment's and instruments used in radioisotope laboratories. The first and most important instrument that was used in nuclear medicine was Geiger tube developed by H.W. Geiger as early in 1908. He in association with Mueller developed the so called Geiger-Muller tube (GM tube) which could be used to detect beta and gamma radiations. In spite of its severe limitations, GM tube remained the only external counting device until 1949. In 1948, Kallman reported that the scintillations can be detected and amplified with the help of photomultiplier tubes (PMTs). In comparison with gas filled detectors, scintillation detectors have two principal advantages that augment their use in nuclear medicine. Firstly, they are capable of much higher counting rates because of fast resolving times and secondly, because they are much more efficient for gamma ray detection. The scintillation detector is the most basic block of any modern radioisotope detection instrument like rate meter, counter, scanner, gamma camera or single photon emission computed tomography. (author)

  19. Ageing management and equipment qualification

    International Nuclear Information System (INIS)

    Stahl, Gunnar

    2014-01-01

    The knowledge of how the environment and load of organic material in general and especially polymers and lubricants, is affecting the degradation of important properties, have increased during the last decade. However the restrictions using established additives like some color pigments due to their poisonousness e.g. pigments based at cadmium, lead, mercury etc. have caused problems when replacing additives to polymers. The replacement additives have often been used in new design without going through the required material qualification procedure. There have also been observed that some non-qualified and non-approved materials have been installed in some power plants due to false documentation. There are also a lot of new manufacturers, of materials similar to the previously qualified materials, active at the market. This increases the difficulty to ensure that the required material quality is used. New materials, new additives and new manufacturers makes if more and more difficult to assure that the expected material is present. This causes more strict demands of how the new materials often used in equipment at type-testing and in replacement materials are analyzed and documented. By implementing new steps for chemical, mechanical and electrical analysis and increase the general quality assurance content this issue can be managed. (authors)

  20. Equipment selection for atmospheric drying

    Energy Technology Data Exchange (ETDEWEB)

    Sharma, P D; Bhattacharyya, S [Nuclear Power Corporation, Bhabha Atomic Research Centre, Mumbai (India)

    1994-06-01

    Heavy water management is a major factor in deciding the economics of the PHWRs. Hence it is necessary to have an efficient recovery system, for the heavy water vapour escaping from various process systems and maintain a dry atmosphere in the recovery areas. While the basic objective of the atmospheric drying system is to maximize recovery and to minimize stack losses, it is equally important to optimally design the system with due consideration to operational and maintenance aspects. At present, heavy water vapour recovery in the existing Nuclear Power Plants (NPPs) is carried out by dryers of dual fixed bed design. While moving bed design could have some advantages, this has not been adopted so far because of the cumbersome mechanical design involved and special requirements for nuclear application. Developmental work done in this direction has resulted in compact alternative designs. In one of the designs, the change over from adsorption to regeneration is achieved by rotating the bed slowly. This concept is further refined in another alternative using a dessicant wheel. This paper contains brief equipment description of different designs; enumerates the design requirements of an atmospheric drying system for reactor building; describes steps for designing fixed bed type D{sub 2}O vapour recovery system, and highlights advances in dryer technology. (author). 2 refs., 4 figs., 1 ill.

  1. Materials division facilities and equipment

    International Nuclear Information System (INIS)

    Biest, O. v.d.

    1984-01-01

    The research activities of the Division at the Petten Establishment have the aims of characterising the properties of high temperature materials in industrial process environments and of understanding the structures involved in order to gain an insight into behavioural mechanisms. Metallic materials fall within the scope of the programme; the activities are, at present, almost entirely concerned with austenitic steels and nickel based alloys. Starting in 1984, advanced ceramic materials will be studied as well. The equipment available permits the study of mechanical properties in controlled gaseous environments, of the rates and mechanisms of corrosive reactions between materials and those environments, and of the surface and bulk structures by advanced physical techniques. Special preparation and treatment techniques are available. The Division has developed a Data Bank on high temperature alloys. It also operates an information Centre, the activities of which include the organisation of scientific meetings, the commissioning of ''state of the art'' studies on topics in the field of high temperature materials and their applications and the development of a inventory of current research activities in the field in Europe. This booklet is intended to present the facilities and services of the Division to the organizations which are interested in its programmes of work

  2. ISS qualified thermal carrier equipment

    Science.gov (United States)

    Deuser, Mark S.; Vellinger, John C.; Jennings, Wm. M.

    2000-01-01

    Biotechnology is undergoing a period of rapid and sustained growth, a trend which is expected to continue as the general population ages and as new medical treatments and products are conceived. As pharmaceutical and biomedical companies continue to search for improved methods of production and, for answers to basic research questions, they will seek out new avenues of research. Space processing on the International Space Station (ISS) offers such an opportunity! Space is rapidly becoming an industrial laboratory for biotechnology research and processing. Space bioprocessing offers exciting possibilities for developing new pharmaceuticals and medical treatments, which can be used to benefit mankind on Earth. It also represents a new economic frontier for the private sector. For over eight years, the thermal carrier development team at SHOT has been working with government and commercial sector scientists who are conducting microgravity experiments that require thermal control. SHOT realized several years ago that the hardware currently being used for microgravity thermal control was becoming obsolete. It is likely that the government, academic, and industrial bioscience community members could utilize SHOT's hardware as a replacement to their current microgravity thermal carrier equipment. Moreover, SHOT is aware of several international scientists interested in utilizing our space qualified thermal carrier. SHOT's economic financing concept could be extremely beneficial to the international participant, while providing a source of geographic return for their particular region. Beginning in 2000, flight qualified thermal carriers are expected to be available to both the private and government sectors. .

  3. Diagnostics of Electric Equipment Windings

    Directory of Open Access Journals (Sweden)

    I. I. Branovitsky

    2007-01-01

    Full Text Available The paper presents methodology and results of the investigations pertaining to study of influence of short-circuited turns on transient electrical processes in electric motor windings. Dependence of their damped speed and value of the difference signal, obtained at reciprocal subtraction of damped oscillation curves in absence and in presence of short-circuited turns, on number of turns in the tested windings. It has been determined that damped oscillation curves, immediately attributed to short-circuited turns, have peak values along temporary axis which are areas of the largest transient process sensitivity to КЗ turns.Methodology for diagnostics of single- and three-phase electric motor windings and also other electric equipment, being realized in DO-1 device, has been developed in the paper. The men­tioned device makes it possible to carry out visual comparison and quantitative analysis of damped oscillation curves in the tested windings with standard ones which are set in the device memory and their difference signals.

  4. WP EMPLACEMENT CONTROL AND COMMUNICATION EQUIPMENT DESCRIPTIONS

    International Nuclear Information System (INIS)

    Raczka, N.T.

    1997-01-01

    The objective and scope of this document are to list and briefly describe the major control and communication equipment necessary for waste package emplacement at the proposed nuclear waste repository at Yucca Mountain. Primary performance characteristics and some specialized design features of the required equipment are explained and summarized in the individual subsections of this document. This task was evaluated in accordance with QAP-2-0 and found not to be quality affecting. Therefore, this document was prepared in accordance with NAP-MG-012. The following control and communication equipment are addressed in this document: (1) Programmable Logic Controllers (PLC's); (2) Leaky Feeder Radio Frequency Communication Equipment; (3) Slotted Microwave guide Communication Equipment; (4) Vision Systems; (5) Radio Control Equipment; and (6) Enclosure Cooling Systems

  5. Procurement strategic analysis of nuclear safety equipment

    International Nuclear Information System (INIS)

    Wu Caixia; Yang Haifeng; Li Xiaoyang; Li Shixin

    2013-01-01

    The nuclear power development plan in China puts forward a challenge on procurement of nuclear safety equipment. Based on the characteristics of the procurement of nuclear safety equipment, requirements are raised for procurement process, including further clarification of equipment technical specification, establishment and improvement of the expert database of the nuclear power industry, adoption of more reasonable evaluation method and establishment of a unified platform for nuclear power plants to procure nuclear safety equipment. This paper makes recommendation of procurement strategy for nuclear power production enterprises from following aspects, making a plan of procurement progress, dividing procurement packages rationally, establishing supplier database through qualification review and implementing classified management, promoting localization process of key equipment continually and further improving the system and mechanism of procurement of nuclear safety equipment. (authors)

  6. Improved servicing equipment for steam generators

    International Nuclear Information System (INIS)

    Hedtke, James C.

    1998-01-01

    To help keep personnel exposure as low as reasonably achievable and reduce critical path outage time, most nuclear plants of PWR design in the USA are now using improved equipment to service their steam generators (SGs) during outages. Because of the success of this equipment in the USA, two Belgian plants and one English plant have purchased this equipment, and other nuclear plants in Europe are also considering procurement. The improved SG servicing equipment discussed in this paper discusses consists of nozzle dams, segmented multi-stud tensioner, primary manway cover handling tool set, shield door and fastener cleaner. This equipment is specifically designed for the individual plant application and can also be specified for replacement SG projects. All of the equipment can be used without modification of the existing SGs. (author)

  7. Equipment Replacement Decision Making: Opportunities and Challenges

    OpenAIRE

    Fan, Wei (David); Gemar, Mason D.; Machemehl, Randy

    2012-01-01

    The primary function of equipment managers is to replace the right equipment at the right time and at the lowest overall cost. In this paper, the opportunities and challenges associated with equipment replacement optimization (ERO) are discussed in detail. First, a comprehensive review of the state-of-the art and state-of-the practice literature for the ERO problem is conducted. Second, a dynamic programming (DP) based optimization solution methodology is presented to solve the ERO problem. T...

  8. History and development of the tennis equipment

    OpenAIRE

    Horáková, Kateřina

    2007-01-01

    Title: History and development of the tennis equipment. Aim of the work: Process an integral, tabular and synoptic historical development overview of the tennis equipment. This owerview will cover the period since the early beginnings of the game to present days. Methods: Advance work has historical charakter therefore used methods are historiogaphical methods such as chronological method and historical method. Results: Produce tabular description of the tennis equipment by means of reading a...

  9. Mine railway equipments management information system

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, X.; Han, K.; Duan, T.; Liu, Z.; Lu, H. [China University of Mining and Technology, Xuzhou (China)

    2007-06-15

    Based on client/server and browser/server models, the management information system described realized the entire life-cycle management of mine railway equipment which included universal equipment and special equipment in the locomotive depot, track maintenance division, electrical depot and car depot. The system has other online functions such as transmitting reports, graphics management, statistics, searches, graphics wizard and web propaganda. It was applied in Pingdingshan Coal Co. Ltd.'s Railway Transport Department. 5 refs., 4 figs.

  10. Aircraft Wiring Support Equipment Integration Laboratory (AWSEIL)

    Data.gov (United States)

    Federal Laboratory Consortium — Purpose:The Aircraft Wiring Support Equipment Integration Laboratory (AWSEIL) provides a variety of research, design engineering and prototype fabrication services...

  11. Making petroleum equipment safe, a priority

    International Nuclear Information System (INIS)

    1999-01-01

    Changes to the 'Act respecting the use of petroleum products' have been announced effective May 1, 1999. The changes have been made to reduce problems which can be attributed to petroleum product leaks. The new regulations will make owners and users of petroleum equipment, including underground and above-ground storage equipment and commercial storage tanks, more accountable for the use of their own equipment. The emphasis in the new regulations is based upon the storage capacity of petroleum equipment and the risks associated with this equipment, rather than the on the activities of the owners concerned. Accordingly, the new regulations call for stricter requirements for high-risk equipment, a private equipment inspection plan, a two-year operating permit, replacing the current permits and certificates, a tariff structure based on the risks associated with the equipment, and deregulation of commercial activities involving petroleum products that require no equipment. Additionally, the amendments to the Act transfer responsibility for administration to the Regie du batiment and to the Ministere des Transports. Details of each of these changes are explained

  12. Utility equipment systems: promising more for less

    Energy Technology Data Exchange (ETDEWEB)

    1987-10-01

    This paper discusses current developments in utility equipment systems, a term applied to carrier vehicles, mostly evolved from well-known forms of construction or mining equipment modified to work with a variety of different front or back end attachments. One of the equipment ranges discussed is the Normet cassette system produced by the Orion corporation of Finland, which allows a basic chassis to be converted from a personnel carrier to an ANFO carrier within minutes. LHD vehicles which are being adapted to fulfil multipurpose roles, such as carrying roof supports, chocks and other heavy mining equipment underground are also discussed. 5 figs.

  13. Detection of Equipment Faults Before Beam Loss

    CERN Document Server

    Galambos, J.

    2016-01-01

    High-power hadron accelerators have strict limits on fractional beam loss. In principle, once a high-quality beam is set up in an acceptable state, beam loss should remain steady. However, in practice, there are many trips in operational machines, owing to excessive beam loss. This paper deals with monitoring equipment health to identify precursor signals that indicate an issue with equipment that will lead to unacceptable beam loss. To this end, a variety of equipment and beam signal measurements are described. In particular, several operational examples from the Spallation Neutron Source (SNS) of deteriorating equipment functionality leading to beam loss are reported.

  14. 21 CFR 866.4500 - Immunoelectrophoresis equipment.

    Science.gov (United States)

    2010-04-01

    ... (CONTINUED) MEDICAL DEVICES IMMUNOLOGY AND MICROBIOLOGY DEVICES Immunology Laboratory Equipment and Reagents... clinical use with its electrical power supply is a device used for separating protein molecules...

  15. PROMSYS, Plant Equipment Maintenance and Inspection Scheduling

    International Nuclear Information System (INIS)

    Morgan, D.L.; Srite, B.E.

    1986-01-01

    1 - Description of problem or function: PROMSYS is a computer system designed to automate the scheduling of routine maintenance and inspection of plant equipment. This 'programmed maintenance' provides the detailed planning and accomplishment of lubrication, inspection, and similar repetitive maintenance activities which can be scheduled at specified predetermined intervals throughout the year. The equipment items included are the typical pumps, blowers, motors, compressors, automotive equipment, refrigeration units, filtering systems, machine shop equipment, cranes, elevators, motor-generator sets, and electrical switchgear found throughout industry, as well as cell ventilation, shielding, containment, and material handling equipment unique to nuclear research and development facilities. Four related programs are used to produce sorted schedule lists, delinquent work lists, and optional master lists. Five additional programs are used to create and maintain records of all scheduled and unscheduled maintenance history. 2 - Method of solution: Service specifications and frequency are established and stored. The computer program reviews schedules weekly and prints, on schedule cards, instructions for service that is due the following week. The basic output from the computer program comes in two forms: programmed-maintenance schedule cards and programmed-maintenance data sheets. The data sheets can be issued in numerical building, route, and location number sequence as equipment lists, grouped for work assigned to a particular foreman as the foreman's equipment list, or grouped by work charged to a particular work order as the work-order list. Data sheets grouped by equipment classification are called the equipment classification list

  16. Equipment Reliability Process in Krsko NPP

    International Nuclear Information System (INIS)

    Gluhak, M.

    2016-01-01

    To ensure long-term safe and reliable plant operation, equipment operability and availability must also be ensured by setting a group of processes to be established within the nuclear power plant. Equipment reliability process represents the integration and coordination of important equipment reliability activities into one process, which enables equipment performance and condition monitoring, preventive maintenance activities development, implementation and optimization, continuous improvement of the processes and long term planning. The initiative for introducing systematic approach for equipment reliability assuring came from US nuclear industry guided by INPO (Institute of Nuclear Power Operations) and by participation of several US nuclear utilities. As a result of the initiative, first edition of INPO document AP-913, 'Equipment Reliability Process Description' was issued and it became a basic document for implementation of equipment reliability process for the whole nuclear industry. The scope of equipment reliability process in Krsko NPP consists of following programs: equipment criticality classification, preventive maintenance program, corrective action program, system health reports and long-term investment plan. By implementation, supervision and continuous improvement of those programs, guided by more than thirty years of operating experience, Krsko NPP will continue to be on a track of safe and reliable operation until the end of prolonged life time. (author).

  17. Additional Equipment for Soil Biodegradation

    Science.gov (United States)

    Vondráčková, Terezie; Kraus, Michal; Šál, Jiří

    2017-12-01

    Intensification of industrial production, increasing citizens’ living standards, expanding the consumer assortment mean in the production - consumption cycle a constantly increasing occurrence of waste material, which by its very nature must be considered as a source of useful raw materials in all branches of human activity. In addition to strict legislative requirements, a number of circumstances characterize waste management. It is mainly extensive transport associated with the handling and storage of large volumes of substances with a large assortment of materials (substances of all possible physical and chemical properties) and high demands on reliability and time coordination of follow-up processes. Considerable differences in transport distances, a large number of sources, processors and customers, and not least seasonal fluctuations in waste and strong price pressures cannot be overlooked. This highlights the importance of logistics in waste management. Soils that are contaminated with oil and petroleum products are hazardous industrial waste. Methods of industrial waste disposal are landfilling, biological processes, thermal processes and physical and chemical methods. The paper focuses on the possibilities of degradation of oil pollution, in particular biodegradation by bacteria, which is relatively low-cost among technologies. It is necessary to win the fight with time so that no ground water is contaminated. We have developed two additional devices to help reduce oil accident of smaller ranges. In the case of such an oil accident, it is necessary to carry out the permeability test of contaminated soil in time and, on this basis, to choose the technology appropriate to the accident - either in-sit biodegradation - at the site of the accident, or on-sit - to remove the soil and biodegrade it on the designated deposits. A special injection drill was developed for in-sit biodegradation, tossing and aeration equipment of the extracted soil was developed for

  18. Lunar construction/mining equipment

    Science.gov (United States)

    Ozdemir, Levent

    1990-01-01

    For centuries, mining has utilized drill and blast as the primary method of rock excavation. Although this technique has undergone significant improvements, it still remains a cyclic, labor intensive operation with inherent safety hazards. Other drawbacks include damage to the surrounding ground, creation of blast vibrations, rough excavation walls resulting in increased ventilation requirements, and the lack of selective mining ability. Perhaps the most important shortcoming of drill and blast is that it is not conducive to full implementation of automation or robotics technologies. Numerous attempts have been made in the past to automate drill and blast operations to remove personnel from the hazardous work environment. Although most of the concepts devised look promising on paper, none of them was found workable on a sustained production basis. In particular, the problem of serious damage to equipment during the blasting cycle could not be resolved regardless of the amount of charge used in excavation. Since drill and blast is not capable of meeting the requirements of a fully automated rock fragmentation method, its role is bound to gradually decrease. Mechanical excavation, in contrast, is highly suitable to automation because it is a continuous process and does not involve any explosives. Many of the basic principles and trends controlling the design of an earth-based mechanical excavator will hold in an extraterrestrial environment such as on the lunar surface. However, the economic and physical limitations for transporting materials to space will require major rethinking of these machines. In concept, then, a lunar mechanical excavator will look and perform significantly different from one designed for use here on earth. This viewgraph presentation gives an overview of such mechanical excavator systems.

  19. A hybrid simulation approach for integrating safety behavior into construction planning: An earthmoving case study.

    Science.gov (United States)

    Goh, Yang Miang; Askar Ali, Mohamed Jawad

    2016-08-01

    One of the key challenges in improving construction safety and health is the management of safety behavior. From a system point of view, workers work unsafely due to system level issues such as poor safety culture, excessive production pressure, inadequate allocation of resources and time and lack of training. These systemic issues should be eradicated or minimized during planning. However, there is a lack of detailed planning tools to help managers assess the impact of their upstream decisions on worker safety behavior. Even though simulation had been used in construction planning, the review conducted in this study showed that construction safety management research had not been exploiting the potential of simulation techniques. Thus, a hybrid simulation framework is proposed to facilitate integration of safety management considerations into construction activity simulation. The hybrid framework consists of discrete event simulation (DES) as the core, but heterogeneous, interactive and intelligent (able to make decisions) agents replace traditional entities and resources. In addition, some of the cognitive processes and physiological aspects of agents are captured using system dynamics (SD) approach. The combination of DES, agent-based simulation (ABS) and SD allows a more "natural" representation of the complex dynamics in construction activities. The proposed hybrid framework was demonstrated using a hypothetical case study. In addition, due to the lack of application of factorial experiment approach in safety management simulation, the case study demonstrated sensitivity analysis and factorial experiment to guide future research. Copyright © 2015 Elsevier Ltd. All rights reserved.

  20. Elephants (and extinct relatives) as earth-movers and ecosystem engineers

    Science.gov (United States)

    Haynes, Gary

    2012-07-01

    Modern African elephants affect habitats and ecosystems in significant ways. They push over trees to feed on upper branches and often peel large sections of bark to eat. These destructive habits sometimes transform woody vegetation into grasslands. Systems of elephant trails may be used and re-used for centuries, and create incised features that extend for many kilometers on migration routes. Elephants, digging in search of water or mineral sediments, may remove several cubic meters of sediments in each excavation. Wallowing elephants may remove up to a cubic meter of pond sediments each time they visit water sources. Accumulations of elephant dung on frequented land surfaces may be over 2 kg per square meter. Elephant trampling, digging, and dust-bathing may reverse stratigraphy at archeological localities. This paper summarizes these types of effects on biotic, geomorphic, and paleontological features in modern-day landscapes, and also describes several fossil sites that indicate extinct proboscideans had very similar effects, such as major sediment disturbances.

  1. Special Equipment and/or Devices.

    Science.gov (United States)

    National Sanitation Foundation, Ann Arbor, MI.

    This standard covers the sanitation requirements for equipment and/or devices used in the storage, preparation, or handling of foods and beverages. The National Sanitation Foundation's basic criteria for the evaluation of special equipment and/or devices has been prepared to fulfill several specific needs, its major function being to serve as a…

  2. 21 CFR 1250.67 - Watering equipment.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Watering equipment. 1250.67 Section 1250.67 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED... of drinking water or other beverages, or for food preservation purposes, equipment constructed so as...

  3. Using ADA Tasks to Simulate Operating Equipment

    Science.gov (United States)

    DeAcetis, Louis A.; Schmidt, Oron; Krishen, Kumar

    1990-01-01

    A method of simulating equipment using ADA tasks is discussed. Individual units of equipment are coded as concurrently running tasks that monitor and respond to input signals. This technique has been used in a simulation of the space-to-ground Communications and Tracking subsystem of Space Station Freedom.

  4. Enhancement of equipment services for Kozloduy NPP

    International Nuclear Information System (INIS)

    Schultz, Christophe

    2013-01-01

    Conclusion After 5 years of maintenance services, KNPP and AREVA have continuously intensified their partnership Close cooperation between KNPP, AREVA Local Office Engineers and OEM experts Involvement of sophisticated tools for diagnostics and condition monitoring Performance of engineering services and obsolescence evaluation Possibilities to perform equipment modernization of Electrical and IC equipment in future

  5. Emergency team personnel and technical equipment

    International Nuclear Information System (INIS)

    Muralt, R.

    1989-01-01

    The most important requirements for the emergency team can be summarized in three points. 1) The emergency team must be made up of top personnel from all fields and it should be functionally equiped. 2) The emergency teams must have complete command of their equipment. 3) The members of the team must be well motivated. 1 fig

  6. Weight/balance portable test equipment

    International Nuclear Information System (INIS)

    Whitlock, R.W.

    1994-01-01

    This document shows the general layout, and gives a part description for the weight/balance test equipment. This equipment will aid in the regulation of the leachate loading of tanker trucks. The report contains four drawings with part specifications. The leachate originates from lined trenches

  7. 7 CFR 550.38 - Equipment.

    Science.gov (United States)

    2010-01-01

    ... Regulations of the Department of Agriculture (Continued) AGRICULTURAL RESEARCH SERVICE, DEPARTMENT OF AGRICULTURE GENERAL ADMINISTRATIVE POLICY FOR NON-ASSISTANCE COOPERATIVE AGREEMENTS Management of Agreements... Agency, the Cooperator shall use the equipment to be replaced as trade-in or sell the equipment and use...

  8. Quantitative techniques for medical equipment maintenance management

    NARCIS (Netherlands)

    Ben Houria, Zeineb; Masmoudi, Malek; Al Hanbali, Ahmad; Khatrouch, Ikram; Masmoudi, Faouzi

    2016-01-01

    The maintenance department in a hospital is responsible for ensuring the safety of medical equipment and their availability while keeping the operation costs minimal. The selection of the best maintenance strategy is a key decision to reduce the equipment downtime, increase the availability, and

  9. 21 CFR 606.60 - Equipment.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 7 2010-04-01 2010-04-01 false Equipment. 606.60 Section 606.60 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) BIOLOGICS CURRENT... following frequency, include but are not limited to: Equipment Performance check Frequency Frequency of...

  10. Plutonium Immobilization Can Loading Equipment Review

    International Nuclear Information System (INIS)

    Kriikku, E.; Ward, C.; Stokes, M.; Randall, B.; Steed, J.; Jones, R.; Hamilton, L.

    1998-05-01

    This report lists the operations required to complete the Can Loading steps on the Pu Immobilization Plant Flow Sheets and evaluates the equipment options to complete each operation. This report recommends the most appropriate equipment to support Plutonium Immobilization Can Loading operations

  11. Radio monitoring problems, methods, and equipment

    CERN Document Server

    Rembovsky, Anatoly; Kozmin, Vladimir; Smolskiy, Sergey

    2009-01-01

    Offers a unified approach to fundamental aspects of Automated Radio Monitoring (ARM). This book discusses the development, modeling, design, and manufacture of ARM systems. It provides classification and descriptions of modern high-efficient hardware-software ARM equipment, including the equipment for detection and radio direction-finding.

  12. Development of Equipment for Use in Sport

    Science.gov (United States)

    James, David

    2012-01-01

    No one has ever been able to create a running shoe that can make one run faster, but in other sports the design of equipment has the potential to offer considerable enhancement. Judgement has to be made as to whether such advantage becomes unfair. This article indicates many possible sports in which the equipment plays an important part in the…

  13. 36 CFR 1207.32 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... 1207.32 Parks, Forests, and Public Property NATIONAL ARCHIVES AND RECORDS ADMINISTRATION GENERAL RULES... as follows: (1) Items of equipment with a current per-unit fair market value of less than $5,000 may...) Items of equipment with a current per unit fair market value in excess of $5,000 may be retained or sold...

  14. 21 CFR 211.65 - Equipment construction.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 4 2010-04-01 2010-04-01 false Equipment construction. 211.65 Section 211.65 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) DRUGS... construction. (a) Equipment shall be constructed so that surfaces that contact components, in-process materials...

  15. 47 CFR 18.203 - Equipment authorization.

    Science.gov (United States)

    2010-10-01

    ... information already on file with the Commission. (2) A technical report pursuant to §§ 18.207 and 18.311. (b... 47 Telecommunication 1 2010-10-01 2010-10-01 false Equipment authorization. 18.203 Section 18.203 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL INDUSTRIAL, SCIENTIFIC, AND MEDICAL EQUIPMENT...

  16. Automatic monitoring of vibration welding equipment

    Science.gov (United States)

    Spicer, John Patrick; Chakraborty, Debejyo; Wincek, Michael Anthony; Wang, Hui; Abell, Jeffrey A; Bracey, Jennifer; Cai, Wayne W

    2014-10-14

    A vibration welding system includes vibration welding equipment having a welding horn and anvil, a host device, a check station, and a robot. The robot moves the horn and anvil via an arm to the check station. Sensors, e.g., temperature sensors, are positioned with respect to the welding equipment. Additional sensors are positioned with respect to the check station, including a pressure-sensitive array. The host device, which monitors a condition of the welding equipment, measures signals via the sensors positioned with respect to the welding equipment when the horn is actively forming a weld. The robot moves the horn and anvil to the check station, activates the check station sensors at the check station, and determines a condition of the welding equipment by processing the received signals. Acoustic, force, temperature, displacement, amplitude, and/or attitude/gyroscopic sensors may be used.

  17. Requirements for industrial x-ray equipment

    International Nuclear Information System (INIS)

    1987-01-01

    This safety code is concerned with the protection of all individuals who may be exposed to radiation emitted by X-ray equipment operating at energies up to 1 MeV as used in industrial radiography. This code presents basic radiation safety information for the protection of personnel operating and servicing X-ray equipment and other workers and the general public in the vicinity of areas where X-ray equipment is in operation. It specifies general safety features of design, construction and functioning of X-ray equipment and facilities; describes the responsibilities of the user, operator and maintenance personnel; contains recommendations to ensure that the X-ray equipment is used and maintained in accordance with the ALARA principle; and describes a program of personnel monitoring and radiation safety surveys. ( 6 refs., 5 tabs., 4 figs.)

  18. Equipment qualification research program: program plan

    International Nuclear Information System (INIS)

    Dong, R.G.; Smith, P.D.

    1982-01-01

    The Lawrence Livermore National Laboratory (LLNL) under the sponsorship of the US Nuclear Regulatory Commission (NRC) has developed this program plan for research in equipment qualification (EQA). In this report the research program which will be executed in accordance with this plan will be referred to as the Equipment Qualification Research Program (EQRP). Covered are electrical and mechanical equipment under the conditions described in the OBJECTIVE section of this report. The EQRP has two phases; Phase I is primarily to produce early results and to develop information for Phase II. Phase I will last 18 months and consists of six projects. The first project is program management. The second project is responsible for in-depth evaluation and review of EQ issues and EQ processes. The third project is responsible for detailed planning to initiate Phase II. The remaining three projects address specific equipment; i.e., valves, electrical equipment, and a pump

  19. Development of Turbulence-Measuring Equipment

    Science.gov (United States)

    Kovasznay, Leslie S G

    1954-01-01

    Hot wire turbulence-measuring equipment has been developed to meet the more stringent requirements involved in the measurement of fluctuations in flow parameters at supersonic velocities. The higher mean speed necessitates the resolution of higher frequency components than at low speed, and the relatively low turbulence level present at supersonic speed makes necessary an improved noise level for the equipment. The equipment covers the frequency range from 2 to about 70,000 cycles per second. Constant-current operation is employed. Compensation for hot-wire lag is adjusted manually using square-wave testing to indicate proper setting. These and other features make the equipment adaptable to all-purpose turbulence work with improved utility and accuracy over that of older types of equipment. Sample measurements are given to demonstrate the performance.

  20. Oil and gas products and energy equipment

    International Nuclear Information System (INIS)

    1996-01-01

    The planned activities of the Canadian oil and gas products and energy equipment industry for 1996-1997, were presented. The sector is made up of approximately 1500 small and medium sized enterprises. The Canadian oil field manufacturing and servicing industry holds only a small 2.5% share of the world export market, but it is recognized internationally as one of the leading suppliers of advanced petroleum equipment. Their exports include specialized equipment for extracting oil sands, gathering and treatment facilities for sour gas, underbalanced drilling technologies, equipment for wells experiencing declining production rates, top motor drives, winter drilling rigs, and horizontal drilling technologies. They also offer petroleum industry software products. Most exploration and production equipment sold abroad by Canadian firms is manufactured in Canada, but there is an increasing trend toward manufacturing in the country of operation. 2 tabs

  1. Equipment for the handling of thorium materials

    International Nuclear Information System (INIS)

    Heisler, S.W. Jr.; Mihalovich, G.S.

    1988-01-01

    The Feed Materials Production Center (FMPC) is the United States Department of Energy's storage facility for thorium. FMPC thorium handling and overpacking projects ensure the continued safe handling and storage of the thorium inventory until final disposition of the materials is determined and implemented. The handling and overpacking of the thorium materials requires the design of a system that utilizes remote handling and overpacking equipment not currently utilized at the FMPC in the handling of uranium materials. The use of remote equipment significantly reduces radiation exposure to personnel during the handling and overpacking efforts. The design system combines existing technologies from the nuclear industry, the materials processing and handling industry and the mining industry. The designed system consists of a modified fork lift truck for the transport of thorium containers, automated equipment for material identification and inventory control, and remote handling and overpacking equipment for material identification and inventory control, and remote handling and overpacking equipment for repackaging of the thorium materials

  2. Energy to the Edge (E2E) Equipment Assessment U.S. Army Rapid Equipping Force

    Science.gov (United States)

    2015-05-01

    84 Contents Energy to the Edge • U.S. Army Rapid Equipping Force U.S. Army Rapid Equipping Force 1.0 Executive Summary Executive Summary U.S. Army... audiovisual equipment. • Once radiant barrier liner is inserted, the process of subsequent setups • Cables for lighting and outlets are located...behind the internal barrier • The shelter comes with organic audiovisual equipment. b. • • This shelter has a different setup and tear down process

  3. Days individual equipment of protection and professional risks; Equipements de protection individuelle et risques professionnelles

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-07-01

    The personal protection equipment is studied in the legal way (legal liabilities, certification, European texts), technical way (ergonomics, painfulness of ventilated equipment wearing, reliability of a respirable air line, protection gloves against the chemical risk, exposure to nano particulates, working in hot area), human factors (hostile area and emotion management), studies on personal equipment such evaluation, efficiency, conception of new equipment, physiological tolerance, limit of use, and some general safety studies on the working places. (N.C.)

  4. Establishment of nuclear equipment qualification system

    International Nuclear Information System (INIS)

    Joo, Po Kook; Lim, Nam Jin; Lee, Young Gun

    2003-04-01

    This study is carried out by KEARI(Korea Atomic Energy Research Institute) as the lead organization in cooperation with KIMM(Korea Institute of Machinery and Materials), KTL(Korea Testing Laboratory) and KRISS(Korea Research Institute of Standards and Science) to construct a basis of efficient management of nuclear equipment qualification business by expanding test equipment of each of participating organization, and developing qualification technologies. As for KIMM, control system of large scale shaker was replaced with advanced system, and LOCA(Loss of Coolant Accident) test facility was installed. KTL is now capable of conducting seismic tests of nuclear I and C as a result of installation of seismic test equipment during the first two project years. KRISS participated in the Project with a view to have large scale EMI test equipment and related technologies. In parallel with expansion of test equipment, a industrial-educational-research cooperation committee, as an intermediate step toward integrated equipment qualification system to maximize the usage of test equipment, was established and cooperation methods were investigated. As a result, Korea Nuclear Equipment Qualification Association, an corporate juridical person, was established. Research on development of thermal and radiation aging test technology of nuclear materials was carried out by Hanyang University and SECO(Saehan Engineering and Qualification Co., Ltd.). Integrated Equipment Qualification Database was developed which contains material test data, equipment qualification data and other EQ related informations. Standard qualification procedures were developed in order for test laboratories and manufacturers to establish design requirements and to efficiently perform tests

  5. Equipment Reliability Program in NPP Krsko

    International Nuclear Information System (INIS)

    Skaler, F.; Djetelic, N.

    2006-01-01

    Operation that is safe, reliable, effective and acceptable to public is the common message in a mission statement of commercial nuclear power plants (NPPs). To fulfill these goals, nuclear industry, among other areas, has to focus on: 1 Human Performance (HU) and 2 Equipment Reliability (EQ). The performance objective of HU is as follows: The behaviors of all personnel result in safe and reliable station operation. While unwanted human behaviors in operations mostly result directly in the event, the behavior flaws either in the area of maintenance or engineering usually cause decreased equipment reliability. Unsatisfied Human performance leads even the best designed power plants into significant operating events, which can be found as well-known examples in nuclear industry. Equipment reliability is today recognized as the key to success. While the human performance at most NPPs has been improving since the start of WANO / INPO / IAEA evaluations, the open energy market has forced the nuclear plants to reduce production costs and operate more reliably and effectively. The balance between these two (opposite) goals has made equipment reliability even more important for safe, reliable and efficient production. Insisting on on-line operation by ignoring some principles of safety could nowadays in a well-developed safety culture and human performance environment exceed the cost of electricity losses. In last decade the leading USA nuclear companies put a lot of effort to improve equipment reliability primarily based on INPO Equipment Reliability Program AP-913 at their NPP stations. The Equipment Reliability Program is the key program not only for safe and reliable operation, but also for the Life Cycle Management and Aging Management on the way to the nuclear power plant life extension. The purpose of Equipment Reliability process is to identify, organize, integrate and coordinate equipment reliability activities (preventive and predictive maintenance, maintenance

  6. Drawing Evaluation Report for Sampling Equipment Drawings

    International Nuclear Information System (INIS)

    BOGER, R.M.

    1999-01-01

    This document presents the results of a task to update the evaluation of River Protection Project (WP) sampling equipment drawings and updates the assigned drawings category as either essential, support, or general drawings. This report updates the drawing evaluation that was originally done per Engineering Task Plan For Truck 3 and 4 Drawing Compliance and Evaluation. The scope of this report is limited to updating the evaluation and identification of drawing category for drawings of certain tank waste sampling equipment for which the RPP Characterization Project has been assigned custody, including: vapor sampling, grab sampling, auger sampling, all core sampling equipment, and Light Duty Utility Arm (LDUA) (see LMHC contract No. 519, release 10). This report does not address drawings for other waste tank deployed equipment systems having similar assigned custody, such as, Cone Penetrometer system, or Long Length Contaminated Equipment (LLCE). The Cone Penetrometer system, which is depicted on vendor drawings, (not H- series), is not currently turned over to operations for deployment. The LLCE equipment was just recently assigned to Characterization Project and was not included in the original scope for this update and will be addressed in the evaluation update scheduled for later in fiscal year 1999, when equipment ownership is determined

  7. Drawing evaluation report for sampling equipment drawings

    International Nuclear Information System (INIS)

    WILSON, G.W.

    1999-01-01

    This document presents the results of a task to evaluate Tank Waste Remediation System (TWRS) sampling equipment drawings and identifies drawings category as either essential, support, or general drawings. This report completes the drawing evaluation task as outlined in Engineering Task Plan For Truck 3 and 4 Drawing Compliance and Evaluation (Wilson, 1997). The scope of this report is limited to an evaluation and identification of drawing category for drawings of certain tank waste sampling equipment for which the TRWS Characterization Project has been assigned custody, including: vapor sampling, grab sampling, auger sampling, and all core sampling equipment (see LMHC Task Order 304). This report does not address drawings for other waste tank deployed equipment systems having similar assigned custody, such as, Light Duty Utility Arm (LDUA), Cone Penetrometer system, or Long Length Contaminated Equipment (LLCE). The LDUA drawings are addressed in the Characterization Equipment Essential Drawings (HNF 1998). The Cone Penetrometer system drawings which are vendor drawings (not H- series) is not currently turned over to operations for deployment. The LLCE equipment was just recently assigned to Characterization Project and were not included in the original scope for this evaluation and will be addressed in the evaluation update scheduled for fiscal year 1999

  8. Progress on EPRI electrical equipment qualification research

    International Nuclear Information System (INIS)

    Sliter, G.E.

    1983-01-01

    The objective of EPRI's electrical equipment qualification research program is to provide technical assistance to utilities in meeting nuclear plant safety requirements in a manner consistent with the state of the art. This paper reports progress on several research projects including: radiation effects studies, which compile data on degradation of organic materials in electrical equipment exposed to operational and accident radiation doses; the Equipment Qualification Data Bank, which is a remotely accessible computer system for disseminating qualification information on in-plant equipment, seismic data, and materials data; an aging/seismic correlation program, which is providing test data showing that, in many cases, age degradation has a negligibly small effect on the performance of electrical components under seismic excitation; a review of condition monitoring techniques, which has identified surveillance methods for measuring key performance parameters that have the potential for predicting remaining equipment life; and large-scale hydrogen burn equipment response tests, which are providing data to assess the ability of equipment to remain functional during and after hydrogen burning in postulated degraded core accidents

  9. Long Length Contaminated Equipment Maintenance Plan

    International Nuclear Information System (INIS)

    ESVELT, C.A.

    2000-01-01

    The purpose of this document is to provide the maintenance requirements of the Long Length Contaminated Equipment (LLCE) trailers and provide a basis for the maintenance frequencies selected. This document is applicable to the LLCE Receiver trailer and Transport trailer assembled by Mobilized Systems Inc. (MSI). Equipment used in conjunction with, or in support of, these trailers is not included. This document does not provide the maintenance requirements for checkout and startup of the equipment following the extended lay-up status which began in the mid 1990s. These requirements will be specified in other documentation

  10. Remote handling equipment for CANDU retubing

    International Nuclear Information System (INIS)

    Crawford, G.S.; Lowe, H.

    1993-01-01

    Numet Engineering Ltd. has designed and supplied remote handling equipment for Ontario Hydro's retubing operation of its CANDU reactors at the Bruce Nuclear Generating Station. This equipment consists of ''Retubing Tool Carriers'' an'' Worktables'' which operate remotely or manually at the reactor face. Together they function to transport tooling to and from the reactor face, to position and support tooling during retubing operations, and to deliver and retrieve fuel channels and channel components. This paper presents the fundamentals of the process and discusses the equipment supplied in terms of its design, manufacturing, components and controls, to meet the functional and quality requirements of Ontario Hydro's retubing process. (author)

  11. Equipment for x- and gamma ray radiography

    International Nuclear Information System (INIS)

    Abd Nasir Ibrahim; Azali Muhammad; Ab Razak Hamzah; Abd Aziz Mohamed; Mohammad Pauzi Ismail

    2004-01-01

    The following topics related to the equipment for x - and gamma ray radiography are discussed in this chapter. The topics are x-ray source for Industrial Radiography: properties of x-ray, generation of x-ray, mechanism of x-ray production, x-ray equipment, power supply, distribution of x-ray intensity along the tube: gamma ray source for Industrial Radiography: properties of gamma rays, gamma ray sources, gamma ray projectors on cameras, source changing. Care of Radiographic Equipments: Merits and Demerits of x and Gamma Rays

  12. Exposure parameters in fluoroscopy equipment. Quality control

    International Nuclear Information System (INIS)

    Alonso, M.; Castaneda, M.J.; Matorras, P.; Diaz-Caneja, N.; Gutierrez, I.

    1992-01-01

    Within the quality control program in Diagnostic Radiology currently being undertaken at the 'Marques de Valdecilla' University Hospital, the corresponding specification and procedure prototypes for the control of conventional radioscopy equipment have been elaborated and applied. This paper presents the values proposed in the specifications and those obtained for the following radioscopy equipment parameters: reference kerma, and its reproducibility, kerma linearity, maximum kerma at the skin, and total filtration. The results obtained indicate that the equipment studied could comply with specified requirements if a Maintenance Program were to be implemented in coordination with the Quality Control Program. (author)

  13. LMZ experience in refurbishment of hydroturbine equipment

    Energy Technology Data Exchange (ETDEWEB)

    Sotnikov, Anatoly A. [LMZ, St. Petersburg (Russian Federation). Div. of Hydraulic Machine

    2000-07-01

    AO LMZ experience in refurbishment of hydroturbine equipment is generalized. Hydraulic turbines of many power stations having been in service of more than 30 years need rehabilitation and modernization. As a rule, the following problems are solved in the process of refurbishment works: increase of turbine efficiency and output, ensuring of reliable operation of the equipment during the next length of life, ensuring the environmental safety of the equipment, furnishing of the power station with up to date automatic control systems. The process of refurbishment used by LMZ is described. The examples of refurbishment are given. (author)

  14. Incidents of chemical reactions in cell equipment

    Energy Technology Data Exchange (ETDEWEB)

    Baldwin, N.M.; Barlow, C.R. [Uranium Enrichment Organization, Oak Ridge, TN (United States)

    1991-12-31

    Strongly exothermic reactions can occur between equipment structural components and process gases under certain accident conditions in the diffusion enrichment cascades. This paper describes the conditions required for initiation of these reactions, and describes the range of such reactions experienced over nearly 50 years of equipment operation in the US uranium enrichment program. Factors are cited which can promote or limit the destructive extent of these reactions, and process operations are described which are designed to control the reactions to minimize equipment damage, downtime, and the possibility of material releases.

  15. [Development of Hospital Equipment Maintenance Information System].

    Science.gov (United States)

    Zhou, Zhixin

    2015-11-01

    Hospital equipment maintenance information system plays an important role in improving medical treatment quality and efficiency. By requirement analysis of hospital equipment maintenance, the system function diagram is drawed. According to analysis of input and output data, tables and reports in connection with equipment maintenance process, relationships between entity and attribute is found out, and E-R diagram is drawed and relational database table is established. Software development should meet actual process requirement of maintenance and have a friendly user interface and flexible operation. The software can analyze failure cause by statistical analysis.

  16. Automatic dose-rate controlling equipment

    International Nuclear Information System (INIS)

    Szasz, T.; Nagy Czirok, Cs.; Batki, L.; Antal, S.

    1977-01-01

    The patent of a dose-rate controlling equipment that can be attached to X-ray image-amplifiers is presented. In the new equipment the current of the photocatode of the image-amplifier is led into the regulating unit, which controls the X-ray generator automatically. The advantages of the equipment are the following: it can be simply attached to any type of X-ray image-amplifier, it accomplishes fast and sensitive regulation, it makes possible the control of both the mA and the kV values, it is attached to the most reliable point of the image-transmission chain. (L.E.)

  17. Maintenance and fabrication of nuclear electronic equipment

    International Nuclear Information System (INIS)

    Hong, Seok Boong; Chung, Chong Eun; Hwang, In Koo; Koo, In Soo; Park, Bum; Kim, Soo Hee; Lee, Seong Joo; Kim, Min Seok; Choi, Wha Lim

    2011-12-01

    - process equipment at PIEF, Chemical Analysis Team and RWFTF have been calibrated. - The electronic equipment and radiation equipment at RWTF and PIEF have been prepared. - Development and installation of integrated RMS software for Hanaro Cold Neutron Laboratory Building(CNLB) RMS, and development and performance upgrade of a portal monitor for CNLB. - Performance test of the Hardware/Software of digital unit controller has been performed, and functional upgrade of the Hardware/Software of stimulator for SMART MMIS performance test facility has also been performed. - A controller of high voltage power supply for a small electron beam generator and a controller for razer pinning and a remote monitoring apparatus of cathode power supply for a 0.2 Mev. small electron beam generator have been designed and fabricated. - Database construction for effective maintenance for the process equipment and radiation instruments are designed and constructed

  18. 18 CFR 367.57 - Equipment.

    Science.gov (United States)

    2010-04-01

    ... piers and foundations that are designed to be as permanent as the buildings that house the equipment, or... walls, ceilings or floors or without in some way impairing the building, must be included in the...

  19. Capitalization of Defense Technology Security Administration Equipment

    National Research Council Canada - National Science Library

    Gimble, Thomas

    1996-01-01

    ... $5.2 million in the Equipment in Use account on its trial balance. Starting with FY 1996, Defense Technology Security Administration financial data will be included in consolidated DoD financial statements...

  20. Hot conditioning equipment conceptual design report

    Energy Technology Data Exchange (ETDEWEB)

    Bradshaw, F.W., Westinghouse Hanford

    1996-08-06

    This report documents the conceptual design of the Hot Conditioning System Equipment. The Hot conditioning System will consist of two separate designs: the Hot Conditioning System Equipment; and the Hot Conditioning System Annex. The Hot Conditioning System Equipment Design includes the equipment such as ovens, vacuum pumps, inert gas delivery systems, etc.necessary to condition spent nuclear fuel currently in storage in the K Basins of the Hanford Site. The Hot Conditioning System Annex consists of the facility of house the Hot Conditioning System. The Hot Conditioning System will be housed in an annex to the Canister Storage Building. The Hot Conditioning System will consist of pits in the floor which contain ovens in which the spent nuclear will be conditioned prior to interim storage.

  1. Hot conditioning equipment conceptual design report

    International Nuclear Information System (INIS)

    Bradshaw, F.W.

    1996-01-01

    This report documents the conceptual design of the Hot Conditioning System Equipment. The Hot conditioning System will consist of two separate designs: the Hot Conditioning System Equipment; and the Hot Conditioning System Annex. The Hot Conditioning System Equipment Design includes the equipment such as ovens, vacuum pumps, inert gas delivery systems, etc.necessary to condition spent nuclear fuel currently in storage in the K Basins of the Hanford Site. The Hot Conditioning System Annex consists of the facility of house the Hot Conditioning System. The Hot Conditioning System will be housed in an annex to the Canister Storage Building. The Hot Conditioning System will consist of pits in the floor which contain ovens in which the spent nuclear will be conditioned prior to interim storage

  2. ENERGY STAR Certified Electric Vehicle Supply Equipment

    Data.gov (United States)

    U.S. Environmental Protection Agency — Certified models meet all ENERGY STAR requirements as listed in the Version 1.0 ENERGY STAR Program Requirements for Electric Vehicle Supply Equipment that are...

  3. Study Of Robotic Replacement Of Equipment Modules

    Science.gov (United States)

    Backes, Paul G.; Tso, Kam S.

    1992-01-01

    Report discusses issues pertaining to control of single-arm robotic manipulator to remove and install interchangeable equipment modules. Presents preliminary control strategy intended to guide development of control algorithms, along with analyses of problems arising in implementing strategy.

  4. Market survey of level measurement equipment

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    In a market survey of level measurement equipment from 42 manufacturers, which is based on different principles of measurement and which is used for different applications, the data of the various manufacturers is compiled. (orig./HP) [de

  5. 77 FR 13173 - Best Equipped Best Served

    Science.gov (United States)

    2012-03-05

    ... on the best equipped, best performing, best served concept for implementation in the 2012-2014... Advisory Committee (NAC). FAA is seeking stakeholder input on the technical and operational feasibility of...

  6. Methods and equipments used in power reactors

    International Nuclear Information System (INIS)

    Beraha, R.; Delevallee, A.

    1976-01-01

    The various reactor γ fuel scanning facilities presently operating around the world are reviewed. Both equipments proposed by FRAMATOME are described: one is intended for scanning removable fuel pencils, and the other one for fuel assembly scanning [fr

  7. AX Tank Farm ancillary equipment study

    International Nuclear Information System (INIS)

    SKELLY, W.A.

    1999-01-01

    This report examines the feasibility of remediating ancillary equipment associated with the 241-AX Tank Farm at the Hanford Site. Ancillary equipment includes surface structures and equipment, process waste piping, ventilation components, wells, and pits, boxes, sumps, and tanks used to make waste transfers to/from the AX tanks and adjoining tank farms. Two remedial alternatives are considered: (1) excavation and removal of all ancillary equipment items, and (2) in-situ stabilization by grout filling, the 241-AX Tank Farm is being employed as a strawman in engineering studies evaluating clean and landfill closure options for Hanford single-shell tanks. This is one of several reports being prepared for use by the Hanford Tanks Initiative Project to explore potential closure options and to develop retrieval performance evaluation criteria for tank farms

  8. VIRTUAL ELECTRONIC COMPONENTS OF THE ELECTRONIC EQUIPMENT

    Directory of Open Access Journals (Sweden)

    E. Lazarevich

    2013-01-01

    Full Text Available The article is present new idea of the creation, developments and improvements of the electronic equipment of complex systems by means of the virtual electronic components. The idea of the virtual electronic components is a presentation and perception of the creation and developments of the equipment on two forming: real – in the manner of standard marketed block of the intellectual property and image – in the manner of virtual component. The real component in most cases slows the development of the electronic equipment. The imaginary component is the «locomotive» of development of the electronic equipment. The Imaginary component contains the scientific has brushed against developer. The scientific has brushed against developer reveals of itself in the manner of virtual component on the modern level of the design rates of microelectronics.

  9. 7 CFR 58.626 - Packaging equipment.

    Science.gov (United States)

    2010-01-01

    ... containers with frozen desserts shall be constructed so that all product contact surfaces shall be of... Standards for Equipment for Packaging Frozen Desserts and Cottage Cheese. Quality Specifications for Raw...

  10. ENERGY STAR Certified Small Network Equipment

    Data.gov (United States)

    U.S. Environmental Protection Agency — Certified models meet all ENERGY STAR requirements as listed in the Version 1.0 ENERGY STAR Program Requirements for Small Networking Equipment that are effective as...

  11. Ethical home medical equipment business practices.

    Science.gov (United States)

    Parver, C

    1991-11-01

    National uniform standards as a condition for receipt of a Medicare provider number would help rid the home medical equipment industry of those unethical and unscrupulous suppliers who have tarnished the industry's reputation.

  12. Experience with rotating equipment in FBTR

    International Nuclear Information System (INIS)

    Babu, A.; Subramanian, K.G.; Selvam, B.

    2006-01-01

    Fast breeder test reactor (FBTR) is a 40MWth sodium cooled PuC-UC fuelled fast breeder reactor located at Kalpakkam, Tamilnadu. FBTR has a variety of mechanical and electrical equipment comprising of single stage and multi stage water pumps, sodium pumps, compressors, Chiller units, Diesel Generator sets, vacuum pumps, ventilation fans, Turbo generator etc. The degree and extent of maintenance on these equipment are decided based on nuclear safety, station technical specification requirements, design criteria and operating philosophy. The variety and complexity of the equipment in FBTR demands various maintenance strategies (preventive, predictive, proactive etc.) for their upkeep. This paper discusses the performance of all mechanical and electrical equipment in FBTR, measures taken for their upkeep, major modifications done to prevent recurring failures, condition monitoring programme implemented, Maintenance Management and Information System developed for data acquisition and dissemination, etc. (author)

  13. Radiation therapy sources, equipment and installations

    International Nuclear Information System (INIS)

    2011-03-01

    The safety code for Telegamma Therapy Equipment and Installations, (AERB/SC/MED-1) and safety code for Brachytherapy Sources, Equipment and Installations, (AERB/SC/MED-3) were issued by AERB in 1986 and 1988 respectively. These codes specified mandatory requirements for radiation therapy facilities, covering the entire spectrum of operations ranging from the setting up of a facility to its ultimate decommissioning, including procedures to be followed during emergency situations. The codes also stipulated requirements of personnel and their responsibilities. With the advent of new techniques and equipment such as 3D-conformal radiation therapy, intensity modulated radiation therapy, image guided radiation therapy, treatment planning system, stereotactic radiosurgery, stereotactic radiotherapy, portal imaging, integrated brachytherapy and endovascular brachytherapy during the last two decades, AERB desires that these codes be revised and merged into a single code titled Radiation Therapy Sources, Equipment, and Installations

  14. Equipment for oral surgery in small animals.

    Science.gov (United States)

    Reiter, Alexander M

    2013-05-01

    This article provides an overview of equipment used for oral surgery. Specific instruments and materials used when performing relevant operative procedures are also mentioned in other articles in this issue. Copyright © 2013 Elsevier Inc. All rights reserved.

  15. Manufacture and maintenance of laboratory equipment

    Energy Technology Data Exchange (ETDEWEB)

    Hwang, Chang Kyu; Hwang, Bong Ha; Lee, Jong Wha; Kim, Jong Kyun; Yeum, Ki Eon; Park, Myung Ku; Hong, Soon Eon; Choi, Ho Young; An, Dae Kyu; An, Choon; Park, In Won; Kim, Kyung Sik; Lee, Won Jae; Yoon, Ki Byung; Kim, Heung Woo; Lee, In Bae; Yeom, Jeong Hyun; Lee, Chul Ku; Sin, Keon Ju; Oh, Wan Ho; Seo, Yong Chil; Yang, Song Yeul; Lee, Young Soon; Choi, Byung Kwon; Chang, Kyung Duk [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1993-12-01

    This report on the manufacture and maintenance of laboratory equipment contains working contents, scope and contents of request working to the machine shop, also records the principal production design, manufacture contents and a relevant working drawing. The working content and scope of the machine shop is to support the successful and convenient performance of the R and D by manufacture and maintenance of all sorts of laboratory equipment. 11 tabs., 3 figs. (Author) .new.

  16. Manufacture and maintenance of laboratory equipment

    International Nuclear Information System (INIS)

    Hwang, Chang Kyu; Hwang, Bong Ha; Lee, Jong Wha; Kim, Jong Kyun; Yeum, Ki Eon; Park, Myung Ku; Hong, Soon Eon; Choi, Ho Young; An, Dae Kyu; An, Choon; Park, In Won; Kim, Kyung Sik; Lee, Won Jae; Yoon, Ki Byung; Kim, Heung Woo; Lee, In Bae; Yeom, Jeong Hyun; Lee, Chul Ku; Sin, Keon Ju; Oh, Wan Ho; Seo, Yong Chil; Yang, Song Yeul; Lee, Young Soon; Choi, Byung Kwon; Chang, Kyung Duk

    1993-12-01

    This report on the manufacture and maintenance of laboratory equipment contains working contents, scope and contents of request working to the machine shop, also records the principal production design, manufacture contents and a relevant working drawing. The working content and scope of the machine shop is to support the successful and convenient performance of the R and D by manufacture and maintenance of all sorts of laboratory equipment. 11 tabs., 3 figs. (Author) .new

  17. Ion beam stabilization in ion implantation equipment

    International Nuclear Information System (INIS)

    Pina, L.

    1973-01-01

    The results are presented of experimental efforts aimed at ion beam current stabilization in an equipment for ion implantation in solids. The related problems of power supplies are discussed. Measured characteristics of laboratory equipment served the determination of the parameters to be required of the supplies as well as the design and the construction of the supplies. The respective wiring diagram is presented. (J.K.)

  18. Manufacture and maintenance of laboratory equipment

    International Nuclear Information System (INIS)

    Kim, Jong Kyun; Hwang, Chang Kyu; Hwang, Bong Ha; Lee, Jong Wha; Yeom, Ki Eon; Park, Myung Ku; Hong, Soon Hyeon; Choi, Ho Young; An, Dae Kyu; An, Choon; Park, In Won; Kim, Kyeong Sik; Lee, In Bae; Yeom, Jeong Heon; Lee, Chul Ku; Sin, Keon Ju; Oh, Wan Ho; Choi, Byung Kwon; Chang, Kyeong Duk; Lee, Young Soon

    1995-12-01

    This report on the manufacture and maintenance of laboratory equipment contains working contents, scope and contents of a request working to the Machine Shop, also records the principal production design, manufacture contents and a relevant working drawing. The working content and scope of the Machine Shop is to support the successful and convenient performance of the Research and development by manufacture and maintenance of all sorts of laboratory equipment. 12 tabs., 5 figs. (Author) .new

  19. Regulatory process for material handling equipment

    International Nuclear Information System (INIS)

    Rajendran, S.; Agarwal, Kailash

    2017-01-01

    Atomic Energy (Factories) Rules (AEFR) 1996, Rule 35 states, 'Thorough inspection and load testing of a Crane shall be done by a Competent Person at least once every 12 months'. To adhere to this rule, BARC Safety Council constituted 'Material Handling Equipment Committee (MHEC)' under the aegis of Conventional Fire and Safety Review Committee (CFSRC) to carry out periodical inspection and certification of Material Handling Equipment (MHE), tools and tackles used in BARC Facilities at Trombay, Tarapur and Kalpakkam

  20. Manufacture and maintenance of laboratory equipment

    International Nuclear Information System (INIS)

    Kim, J. K.; Whang, C. K.; Lee, J. H.; Youm, K. Y.; Hong, S. H.; Choi, H. Y.; An, C.; Park, I. W.; Kim, K. S.; Lee, W. J.; Yoon, K. B.; Kim, H. W.; Lee, I. B.; Lee, C. K.; Youm, J. H.; Oho, W. H.; Choi, B. K.; Jang, K. D.

    1996-12-01

    This report on the manufacture and maintenance of laboratory equipment contains working contents, scope and contents of a request working to the Machine Shop, also records the principal production design, manufacture contents and a relevant working drawing. The working content and scope of the Machine Shop is to support the successful and convenient performance of the R and D by manufacture and maintenance of all sorts of laboratory equipment. (author). 9 tabs., 12 figs

  1. Stud bolt handling equipment for reactor vessel

    International Nuclear Information System (INIS)

    Bunyan, T.W.

    1989-01-01

    Reactor vessel stud bolt handling equipment includes means for transferring a stud bolt to a carrier from a parking station, or vice versa. Preferably a number of stud bolts are handled simultaneously. The transfer means may include cross arms rotatable about extendable columns, and the equipment is mounted on a mobile base for movement into and out of position. Each carrier comprises a tubular socket and an expandable sleeve to grip a stud bolt. (author)

  2. Protecting electrical equipment against dust explosions

    Energy Technology Data Exchange (ETDEWEB)

    Kaiser, J

    1981-07-01

    The new ordinance on electrical equipment in hazardous areas and the new VDE 0165/6.80 have brought about significant changes in the field of electrical equipment in areas with a explosion hazard due inflammable dust. There are no constructional regulations yet in this field, and producers, planners, and users are uncertain about what measures to take. The article attempts to clear up a few points.

  3. Manufacture and maintenance of laboratory equipment

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jong Kyun; Hwang, Chang Kyu; Hwang, Bong Ha; Lee, Jong Wha; Yeom, Ki Eon; Park, Myung Ku; Hong, Soon Hyeon; Choi, Ho Young; An, Dae Kyu; An, Choon; Park, In Won; Kim, Kyeong Sik; Lee, In Bae; Yeom, Jeong Heon; Lee, Chul Ku; Sin, Keon Ju; Oh, Wan Ho; Choi, Byung Kwon; Chang, Kyeong Duk; Lee, Young Soon [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1995-12-01

    This report on the manufacture and maintenance of laboratory equipment contains working contents, scope and contents of a request working to the Machine Shop, also records the principal production design, manufacture contents and a relevant working drawing. The working content and scope of the Machine Shop is to support the successful and convenient performance of the Research and development by manufacture and maintenance of all sorts of laboratory equipment. 12 tabs., 5 figs. (Author) .new.

  4. Profit ability versus construction equipment maintenance

    OpenAIRE

    Clutts, Craig A.

    2010-01-01

    CIVINS (Civilian Institutions) Thesis document Approved for public release ; distribution is unlimited Construction equipment is a high cost of capital investment necessary for the successful existence of a private construction company and essential to the mission success of the Naval Construction Force (NCF). The highest impact cost factor other than the initial purchase investment is the expenses related to maintenance and repair. As the equipment ages, the ownership costs decrease an...

  5. Electronic equipment for spectrometric data processing

    International Nuclear Information System (INIS)

    Antonov, L.J.; Trenev, A.M.; Todorova, E.I.; Dimitrov, V.D.

    1978-01-01

    Electronic equipment carrying out logical operations and a full set of the arithmetic operations was developed for spectrometric data processing. The flowsheet of the computing part of the device, made on the basis of a specialized integral circuit, is given. The device includes input registers, multiplexor, matrix commutator, arithmetic unit and indication unit. The equipment is rated to carry out calculations according to comparatively complex formulae in several seconds

  6. Physical protection equipment study. Final report

    International Nuclear Information System (INIS)

    Haberman, W.

    1977-06-01

    This report summarizes the work performed by MITRE for the U.S. Nuclear Regulatory Commission. The major products of this effort are a Catalog of Physical Protection Equipment, a Guide for Evaluation of Physical Protection Equipment, a book of Reference Materials, and a set of guidelines for use in the development of a methodology for measuring levels of security system effectiveness. A summary of recommendations resulting from this study is also presented

  7. Industrial Employment, Investment Equipment and Economic Growth

    OpenAIRE

    Dellas, Harris

    2000-01-01

    The industrialization of labour is the main engine of growth during the early stages of economic development. In less developed countries, equipment investment has played a less important role than non-equipment investment; and it has only proved growth enhancing when it either encountered a substantial industrial labour force or fostered a large increase in the share of industrial employment. These findings draw attention to the effects of investment on the composition of the labour force; a...

  8. The french safety approach regarding equipment qualification

    International Nuclear Information System (INIS)

    Jalouneix, J.; Deletre, G.; Henry, J.Y.; Rousseau, L.

    1989-10-01

    The qualification of the equipment, used in France on nuclear reactors and reactor components, is discussed. The approach on safety involves the qualification of mechanical and electrical components, under operating and under seismic conditions. The principles of the qualification program and the list of the equipment concerned, are given. The conditions in which qualification tests are performed and the methods applied, are summarized. The actions for preserving the qualification procedures, are considered

  9. Equipment system for advanced nuclear fuel development

    International Nuclear Information System (INIS)

    Kwon, Hyuk Il; Ji, C. G.; Bae, S. O.

    2002-11-01

    The purpose of the settlement of equipment system for nuclear Fuel Technology Development Facility(FTDF) is to build a seismic designed facility that can accommodate handling of nuclear materials including <20% enriched Uranium and produce HANARO fuel commercially, and also to establish the advanced common research equipment essential for the research on advanced fuel development. For this purpose, this research works were performed for the settlement of radiation protection system and facility special equipment for the FTDF, and the advanced common research equipment for the fuel fabrication and research. As a result, 11 kinds of radiation protection systems such as criticality detection and alarm system, 5 kinds of facility special equipment such as environmental pollution protection system and 5 kinds of common research equipment such as electron-beam welding machine were established. By the settlement of exclusive domestic facility for the research of advanced fuel, the fabrication and supply of HANARO fuel is possible and also can export KAERI-invented centrifugal dispersion fuel materials and its technology to the nations having research reactors in operation. For the future, the utilization of the facility will be expanded to universities, industries and other research institutes

  10. Similarity principles for equipment qualification by experience

    International Nuclear Information System (INIS)

    Kana, D.D.; Pomerening, D.J.

    1988-07-01

    A methodology is developed for seismic qualification of nuclear plant equipment by applying similarity principles to existing experience data. Experience data are available from previous qualifications by analysis or testing, or from actual earthquake events. Similarity principles are defined in terms of excitation, equipment physical characteristics, and equipment response. Physical similarity is further defined in terms of a critical transfer function for response at a location on a primary structure, whose response can be assumed directly related to ultimate fragility of the item under elevated levels of excitation. Procedures are developed for combining experience data into composite specifications for qualification of equipment that can be shown to be physically similar to the reference equipment. Other procedures are developed for extending qualifications beyond the original specifications under certain conditions. Some examples for application of the procedures and verification of them are given for certain cases that can be approximated by a two degree of freedom simple primary/secondary system. Other examples are based on use of actual test data available from previous qualifications. Relationships of the developments with other previously-published methods are discussed. The developments are intended to elaborate on the rather broad revised guidelines developed by the IEEE 344 Standards Committee for equipment qualification in new nuclear plants. However, the results also contribute to filling a gap that exists between the IEEE 344 methodology and that previously developed by the Seismic Qualification Utilities Group. The relationship of the results to safety margin methodology is also discussed. (author)

  11. Seismic verification of nuclear plant equipment anchorage

    International Nuclear Information System (INIS)

    Lepiece, M.; Van Vyve, J.

    1991-01-01

    More than 60% of the electrical power of Belgium is generated by seven PWR nuclear power plants. For three of them, the electro-mechanical equipment had to be reassessed after ten years of operation, because the seismic requirements were upgraded from 0.1 g to 0.17 g free field ground acceleration. The seismic requalification of the active equipment was a critical problem as the classical methods were too conservative. The approach based on the use of the past experience on the seismic behavior of nonnuclear equipment, chosen and developed by the SQUG, had to be transposed to the Belgian N.P.P. The decision of the accept-ability of equipment relies heavily on the aseismatic capacity of anchorage. The Electrical Power Research Institute (EPRI) developed the procedure and guideline for the demonstration of the aseismatic adequacy of equipment anchorage in a cost-effective and consistent manner, to support the decision by Seismic Review Team. The field inspection procedure to identify the type of fasteners and detect their possible defects and the verification procedure developed to calculate the aseismatic capacity of equipment anchorage on the strength of fasteners, the aseismatic capacity of anchorage and the comparison of the capacity with the demand are reported. (K.I.)

  12. Development of remote handling tools and equipment

    International Nuclear Information System (INIS)

    Nakahira, Masataka; Oka, Kiyoshi; Taguchi, Kou; Ito, Akira; Fukatsu, Seiichi; Oda, Yasushi; Kajiura, Soji; Yamazaki, Seiichiro; Aoyama, Kazuo.

    1997-01-01

    The remote handling (RH) tools and equipment development in ITER focuses mainly on the welding and cutting technique, weld inspection and double-seal door which are essential factors in the replacement of in-vessel components such as divertor and blanket. The conceptual design of these RH tools and equipment has been defined through ITER engineering design activity (EDA). Similarly, elementary R and D of the RH tools and equipment have been extensively performed to accumulate a technological data base for process and performance qualification. Based on this data, fabrications of full-scale RH tools and equipment are under progress. A prototypical bore tool for pipe welding and cutting has already been fabricated and is currently undergoing integrated performance tests. This paper describes the design outline of the RH tools and equipment related to in-vessel components maintenance, and highlights the current status of RH tools and equipment development by the Japan Home Team as an ITER R and D program. This paper also includes an outline of insulation joint and quick-pipe connector development, which has also been conducted through the ITER R and D program in order to standardize RH operations and components. (author)

  13. 7 CFR 58.229 - Filler and packaging equipment.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 3 2010-01-01 2010-01-01 false Filler and packaging equipment. 58.229 Section 58.229....229 Filler and packaging equipment. All filling and packaging equipment shall be of sanitary... equipment should comply with the 3-A Sanitary Standards for equipment for Packaging Dry Milk and Dry Milk...

  14. 46 CFR 108.719 - Pilot boarding equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Pilot boarding equipment. 108.719 Section 108.719... AND EQUIPMENT Miscellaneous Equipment § 108.719 Pilot boarding equipment. (a) This section applies to... vessel must have suitable pilot boarding equipment available for use on each side of the vessel. If a...

  15. 46 CFR 109.347 - Pilot boarding equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Pilot boarding equipment. 109.347 Section 109.347... OPERATIONS Operation and Stowage of Safety Equipment § 109.347 Pilot boarding equipment. (a) The master or person in charge shall ensure that pilot boarding equipment is maintained as follows: (1) The equipment...

  16. 46 CFR 77.40-1 - Pilot boarding equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 3 2010-10-01 2010-10-01 false Pilot boarding equipment. 77.40-1 Section 77.40-1... MISCELLANEOUS SYSTEMS AND EQUIPMENT Pilot Boarding Equipment § 77.40-1 Pilot boarding equipment. (a) This... vessel. (b) Each vessel must have suitable pilot boarding equipment available for use on each side of the...

  17. 7 CFR 3015.167 - Replacement of equipment.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Replacement of equipment. 3015.167 Section 3015.167..., DEPARTMENT OF AGRICULTURE UNIFORM FEDERAL ASSISTANCE REGULATIONS Property § 3015.167 Replacement of equipment. (a) If needed, equipment may be exchanged for replacement equipment. Replacement of equipment may be...

  18. 46 CFR 180.175 - Survival craft equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Survival craft equipment. 180.175 Section 180.175... TONS) LIFESAVING EQUIPMENT AND ARRANGEMENTS Survival Craft Arrangements and Equipment § 180.175 Survival craft equipment. (a) General. Each item of survival craft equipment must be of good quality, and...

  19. 14 CFR 135.173 - Airborne thunderstorm detection equipment requirements.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Airborne thunderstorm detection equipment... Aircraft and Equipment § 135.173 Airborne thunderstorm detection equipment requirements. (a) No person may... the aircraft is equipped with either approved thunderstorm detection equipment or approved airborne...

  20. Equipment installation structure of roof slab for tank type FBR and method of equipment installation

    International Nuclear Information System (INIS)

    Sakai, Takao; Yamakawa, Masanori; Otsuka, Masaya; Sekine, Katsuhisa

    1986-01-01

    Purpose: To reduce equipment thermal stress and deformation by eliminating uneven temperature distribution caused at the equipment through section of the roof slab for the tank FBR, and at the same time, simplify the structure installation. Method: Multiple number of vertical fin projects are fit on the equipment through-section inside wall for the roof slab and the cylindrical equipment peripheral wall, and with these projected fins, the ring space of the through section is vertically divided into multiple sections in the circumferential direction. The vertical fins on the through-section inside wall and the fins on the equipment peripheral wall are contacted with each other by revolving them in the lateral direction. As a result, the natural convection caused by the difference of temperatures in the vertical direction of the ring space becomes a convection within each sector divided, and never generates circumferential circulation, which reduce uneven temperature distribution caused at the equipment through section. (Kawakami, Y.)

  1. Environmental/dynamic mechanical equipment qualification and dynamic electrical equipment qualification program (EDQP)

    International Nuclear Information System (INIS)

    Hunter, J.A.

    1984-01-01

    Equipment qualification research is being conducted to investigate acceptable criteria, requirements, and methodologies for the dynamic (including seismic) and environmental qualification of mechanical equipment and for the dynamic (including seismic) qualification of electrical equipment. The program is organized into three elements: (1) General Research, (2) Environmental Research, and (3) Dynamic Research. This paper presents the highlights of the results to date in these three elements of the program

  2. PROBLEMS PERTAINING TO DIVERSIFICATION OF CIVIL EQUIPMENT IN EQUIPMENT OF MILITARY PURPOSE

    OpenAIRE

    A. I. Kotlabay; V. A. Korobkin; V. F. Tamelo; I. V. Kostko; S. V. Kondratiev

    2009-01-01

    Study of directions concerning development of military equipment, its modernization with the purpose to improve its military efficiency is an actual problem for the Armed Forces, military science, designers and researchers.The paper analyzes and estimates possibilities to use civil equipment for military purpose. Problems pertaining to technologies of double application, diversification of civil equipment in military engineering machinery are considered in the paper.

  3. Use of Equipment Information System (EQUIS) to determine priority for purchasing safeguards equipment

    International Nuclear Information System (INIS)

    Silberberg, S.

    1988-01-01

    To manage its large world-wide inventory of safeguards equipment, the IAEA Safeguards department uses a computerized Equipment Information System (EQUIS). EQUIS data have been analyzed using Queueing Theory to determine if inventory is adequate to meet inspector demands and in those cases where it is inadequate, to indicate how many additional units should be procured. Results are tabulated for various types of non-destructive analysis (NDA) equipment. For equipment where there is a high turnover and hence a large amount of data, the analysis provides a powerful tool for assisting procurement decisions

  4. Methodology for assessing laser-based equipment

    Science.gov (United States)

    Pelegrina-Bonilla, Gabriel; Hermsdorf, Jörg; Thombansen, Ulrich; Abels, Peter; Kaierle, Stefan; Neumann, Jörg

    2017-10-01

    Methodologies for the assessment of technology's maturity are widely used in industry and research. Probably the best known are technology readiness levels (TRLs), initially pioneered by the National Aeronautics and Space Administration (NASA). At the beginning, only descriptively defined TRLs existed, but over time, automated assessment techniques in the form of questionnaires emerged in order to determine TRLs. Originally TRLs targeted equipment for space applications, but the demands on industrial relevant equipment are partly different in terms of, for example, overall costs, product quantities, or the presence of competitors. Therefore, we present a commonly valid assessment methodology with the aim of assessing laser-based equipment for industrial use, in general. The assessment is carried out with the help of a questionnaire, which allows for a user-friendly and easy accessible way to monitor the progress from the lab-proven state to the application-ready product throughout the complete development period. The assessment result is presented in a multidimensional metric in order to reveal the current specific strengths and weaknesses of the equipment development process, which can be used to direct the remaining development process of the equipment in the right direction.

  5. Characterization equipment essential/support drawing plan

    International Nuclear Information System (INIS)

    WILSON, G.W.

    1999-01-01

    The purpose of this document is to list the Characterization equipment drawings that are classified as Essential Drawings and Support Drawings. Essential Drawings: Are those drawings identified by the facility staff as necessary to directly support the safe operation of the facility or equipment (HNF 1997a). Support Drawings: Are those drawings identified by facility staff that further describe the design details of structures, systems, or components shown on essential drawings. (HNF 1997a) The Characterization equipment drawings identified in this report are deemed essential drawings as defined in HNF-PRO-242, Engineering Drawing Requirements (HNF 1997a). These drawings will be prepared, revised, and maintained per HNF-PRO-440, Engineering Document Change Control (HNF 1997b). All other Characterization equipment drawings not identified in this document will be considered General drawings until the Characterization Equipment Drawing Evaluation Report (Wilson 1998) is updated during fiscal year 1999. Trucks 1 and 2 drawings are not included in this revision of the essential drawing list due to uncertainty about future use

  6. Diagnostic imaging and radiation therapy equipment

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1990-05-01

    This is the third edition of CSA Standard C22.2 No. 114 (now CAN/CSA-C22.2 No. 114), which is one of a series of standards issued by the Canadian Standards Association under Part II of the Canadian Electrical Code. This edition marks an important shift towards harmonization of Canadian requirements with those of the European community and the United States. Also important to this edition is the expansion of its scope to include the complete range of diagnostic imaging and radiation therapy equipment, rather than solely radiation-emitting equipment. In so doing, equipment previously addressed by CSA Standard C22.2 No. 125, Electromedical Equipment, specifically lasers for medical applications and diagnostic ultrasound units, is now dealt with in the new edition. By virtue of this expanded scope, many of the technical requirements in the electromedical equipment standard have been introduced to the new edition, thereby bringing CSA Standard C22.2 No. 114 up to date. 14 tabs., 16 figs.

  7. Diagnostic imaging and radiation therapy equipment

    International Nuclear Information System (INIS)

    1990-05-01

    This is the third edition of CSA Standard C22.2 No. 114 (now CAN/CSA-C22.2 No. 114), which is one of a series of standards issued by the Canadian Standards Association under Part II of the Canadian Electrical Code. This edition marks an important shift towards harmonization of Canadian requirements with those of the European community and the United States. Also important to this edition is the expansion of its scope to include the complete range of diagnostic imaging and radiation therapy equipment, rather than solely radiation-emitting equipment. In so doing, equipment previously addressed by CSA Standard C22.2 No. 125, Electromedical Equipment, specifically lasers for medical applications and diagnostic ultrasound units, is now dealt with in the new edition. By virtue of this expanded scope, many of the technical requirements in the electromedical equipment standard have been introduced to the new edition, thereby bringing CSA Standard C22.2 No. 114 up to date. 14 tabs., 16 figs

  8. Design by analysis of composite pressure equipment

    International Nuclear Information System (INIS)

    Durand, S.; Mallard, H.

    2004-01-01

    Design by analysis has been particularly pointed out by the european pressure equipment directive. Advanced mechanical analysis like finite element method are used instead of classical design by formulas or graphs. Structural behaviour can be understood by the designer. Design by analysis of metallic pressure equipments is widely used. Material behaviour or limits analysis is based on sophisticated approach (elasto-plastic analysis,..). Design by analysis of composite pressure equipments is not systematically used for industrial products. The difficulty comes from the number of information to handle. The laws of mechanics are the same for composite materials than for steel. The authors want to show that in design by analysis, the composite material approach is only more complete than the metallic approach. Mechanics is more general but not more complicated. A multi-material approach is a natural evolution of design by analysis of composite equipments. The presentation is illustrated by several industrial cases - composite vessel: analogy with metallic calculations; - composite pipes and fittings; - welding and bounding of thermoplastic equipments. (authors)

  9. Resistance welding equipment manufacturing capability for exports

    Energy Technology Data Exchange (ETDEWEB)

    Sastry, V.S.; Raju, Y.S.; Somani, A.K.; Setty, D.S.; Rameswara Raw, A.; Hermantha Rao, G.V.S.; Jayaraj, R.N. [Nuclear Fuel Complex, Dept. of Atomic Energy, Hyderbad (India)

    2010-07-01

    Indian Pressurised Heavy Water Reactor (PHWR) fuel bundle is fully welded and is unique in its design. Appendage welding, end closure welding, and end plate welding is carried out using resistance welding technique. Out of many joining processes available, resistance-welding process is reliable, environment friendly and best suitable for mass production applications. Nuclear Fuel Complex (NFC), an industrial unit is established in Hyderabad, under the aegis of the Dept of Atomic Energy to manufacture fuel for Pressurised Heavy Water Reactors. From inception, NFC has given importance for self-reliance and indigenization with respect to manufacturing process and equipment. Sintering furnaces, centreless grinders, appendage-welding machines, end-closure welding equipment and end-plate welding equipments, which were initially imported, are either indigenized or designed and manufactured in house. NFC has designed, manufactured a new appendage-welding machine for manufacturing 37 element fuel bundles. Recently NFC has bagged an order from IAEA through international bidding for design, manufacture, supply, erection and commissioning of end-closure welding equipment. The paper gives in detail the salient features of these welding equipment. (author)

  10. A Computerized Procedure linked to Virtual Equipment

    International Nuclear Information System (INIS)

    Jung, Yeon Sub; Song, Tae Young

    2011-01-01

    Digital, information, and communication technologies have change human's behavior. This is because human has limitation to memorize and process information. Human has to access other information and real time information for important decisions. Those technologies are playing important roles. Nuclear power plants cannot be exception. Many accidents in nuclear power plants result from absent or incorrect information. The information for nuclear personnel is context sensitive. They don't have enough time to verify the context sensitive information. Therefore they skip the information, as resulting in incident. Nuclear personnel are usually carrying static paper procedures during local task performance. The procedure guides them steps to follow. There is, however, no dynamic and context sensitive information in the paper. The effect of the work is evaluated once while getting permission of the work. Afterward they are not informed. The static paper is generally simplified, so that it does not show detail of equipment being manipulated. Particularly novice workers feel difficult to understand the procedure due to lack of detail. Pictures of equipment inserted in the procedure are not enough for comprehension. A computerized procedure linked with virtual equipment is one of the best solutions to increase the detail of procedure. Virtual equipment, however, has still limitation not to provide real time information, because the virtual equipment is not synchronized with real plants

  11. 18 CFR 367.3980 - Account 398, Miscellaneous equipment.

    Science.gov (United States)

    2010-04-01

    ... service company's operations that are not included in any other account of this system of accounts. (b... equipment. (3) Employees' recreation equipment. (4) Radios. (5) Restaurant equipment. (6) Soda fountains. (7...

  12. Lessons learned in testing of Safeguards equipment

    International Nuclear Information System (INIS)

    Pepper, Susan; Farnitano, Michael; Carelli, Joseph

    2001-01-01

    Full text: During the 1990s, the IAEA Department of Safeguards began a transition from analog to digital equipment. This included surveillance equipment, seals, NDA measurement systems, and other instruments. The transition to digital equipment was intended to facilitate compatibility between and integration of instruments, remote communication of data, improved data storage, and modernization. Many of the instruments are designed to operate on battery power during loss of facility power, and therefore, are designed to consume minimal power. In 2000, the IAEA experienced a number of failures in digital image surveillance (DIS) equipment. A study of the performance data revealed that the failures occurred in 'high risk' environments where the systems were exposed to neutrons. As a supporter of IAEA equipment development and implementation, the U.S. Support Program worked with the IAEA, the equipment designer, and the equipment manufacturer in special meetings on DIS to determine the cause of the failures. It was as a result of these meetings that single event upset (SEU) was determined to be the root cause of the failures. The meeting participants also identified a list of actions to improve the reliability of DIS systems. As a result of the DIS meetings and the identified actions, the U.S. Support Program approved a request from the IAEA and established Task E.125, 'Remote Monitoring and Unattended Digital Surveillance Systems.' This task is an umbrella task intended to provide a mechanism for response to IAEA needs related to improving the reliability of unattended, remote monitoring and DIS equipment. Subtasks approved under this task include: E.125.1, 'SDIS Software Consolidation and DCM-14 Audit' - This subtask involves the consolidation of a number of individual upgrades to the SDIS and review of the DCM-14 software. As the sponsor of the design of the DCM-14 by Dr. Neumann, the German Support Program is also a participant in this subtask; E.125.2, 'DIS

  13. EPERC: The European Pressure Equipment Research Council

    International Nuclear Information System (INIS)

    Darlaston, J.; McAllister, S.

    1998-01-01

    The European Pressure Equipment Research Council (EPERC) is a European Network of industries, research laboratories, inspection bodies and governmental institutions set up to foster co-operative research for the greater benefit of the European industry. The concept of a European Research Council originated at the PVRC meeting in Cannes in 1989 and since this time volunteers from the industry, research laboratories and of the European Commission Joint Research Centre, Petten have worked together to create a Statute for EPERC. In the context of the pressure equipment industry, the creation of EPERC is extremely pertinent, since in the near future, a Council directive on pressure equipment will replace the existing national regulations. In parallel to this, work is in progress for the elaboration of European Standards. It is useful to recall that ''Harmonised Standards'' will be the privileged means of complying with the Essential Safety Requirements of the directive. (author)

  14. Development of nuclear equipment qualification technology

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Heon O; Kim, Wu Hyun; Kim, Jin Wuk; Kim, Jeong Hyun; Lee, Jeong Kyu; Kim, Yong Han; Jeong, Hang Keun [Korea Institute of Machinery and Materials, Taejon (Korea)

    1999-03-01

    In order to enhance testing and evaluation technologies, which is one of the main works of the Chanwon branch of KIMM(Korea Institute of Machinery and Materials), in addition to the present work scope of the testing and evaluation in the industrial facilities such as petroleum and chemical, plants, the qualification technologies of the equipments important to safety used in the key industrial facilities such as nuclear power plants should be localized: Equipments for testing and evaluation is to be set up and the related technologies must be developed. In the first year of this study, of vibration aging qualification technologies of equipments important to safety used in nuclear power plants have been performed. (author). 27 refs., 81 figs., 17 tabs.

  15. Optimization on replacement period of plant equipment

    International Nuclear Information System (INIS)

    Kasai, Masao; Asano, Hiromi

    2002-01-01

    Optimization of the replacement period of plant equipment is one of the main items to rationalize the activities on plant maintenance. There are several models to replace the equipment and the formulations for optimizing the replacement period are different among these models. In this study, we calculated the optimum replacement periods for some equipment parts based on the replacement models and found that the optimum solutions are not so largely differ from the replacement models as far as the replacement period is not so large. So we will be able to use the most usable model especially in the early phase of rationalization on plant maintenance, since there are large uncertainties in data for optimization. (author)

  16. Maintenance and fabrication of electronic equipment

    International Nuclear Information System (INIS)

    Chung, Chong Eun; Moon, Byung Soo; Hong, Suk Boong; Kim, Yong Keun; Kim, Jung Bok

    2003-12-01

    Development of radiation monitoring equipment could be the base of domestic development of RMS. And the technique could be adapted to development of other radiation equipment of KAERI as well as hospitals and nuclear power plants. The RMS technology could be adapted to the development of precision instruments related to nuclear radiation and be the base of fundamental technology such as protein structure analysis of bio technology, development of nano advanced material and aircraft material. The technology of multi-channel readout ASIC for nuclear radiation detector, which has been imported from abroad, could be adapted to development of radiation equipment for image processing, position of detection, NDT etc., and also the technique will be expected to contribute to increase the use of radiation technology to industrial applications

  17. Methods of equipment choice in shotcreting

    Science.gov (United States)

    Sharapov, R. R.; Yadykina, V. V.; Stepanov, M. A.; Kitukov, B. A.

    2018-03-01

    Shotcrete is widely used in architecture, hydraulic engineering structures, finishing works in tunnels, arc covers and ceilings. The problem of the equipment choice in shotcreting is very important. The main issues influencing the equipment choice are quality improvement and intensification of shotcreting. Main parameters and rational limits of technological characteristic of machines used in solving different problems in shotcreting are described. It is suggested to take into account peculiarities of shotcrete mixing processes and peculiarities of applying these mixtures with compressed air kinetic energy. The described method suggests choosing a mixer with the account of energy capacity, Reynolds number and rotational frequency of the mixing drum. The suggested choice procedure of the equipment nomenclature allows decreasing exploitation costs, increasing the quality of shotcrete and shotcreting in general.

  18. Equipment for light therapy BIOFIE family

    International Nuclear Information System (INIS)

    Corcho Corcho, C. A.; Perez Garcia, A.; Herrera Rodriguez, R.

    2016-01-01

    The development experienced in the design and implementation of equipment are presented, within the subject matter of the application of low level laser and also them LED of high efficiency with therapeutic purposes in health and also in animal health, besides, the use of this technology for this application in agriculture. All the equipment that show up has been developed for the Dpto. of Bioengineer of High Politechnical Institute Jose A. Echeverria (CUJAE) in association with Dpto. of Prototypes of the same institution, under the trademark BIOFIE. Like fundamental and innovative characteristic we can make a comment that all equipment destined to health and animal health, work on continuos and modulated signal mode, using in this mode different bio frequencies. (Author)

  19. Development of superconducting equipment for fusion device

    International Nuclear Information System (INIS)

    Konno, Masayuki; Ueda, Toshio; Hiue, Hisaaki; Ohgushi, Kouzou

    1993-01-01

    At Fuji Electric Co., Ltd., the development of superconductivity was started from 1960, and superconducting equipment for fusion device has been developed for ten years. The superconducting equipment, which is developed for fusion by Fuji Electric Co., Ltd., are able to be grouped in three categories which are current lead, superconducting coil and superconducting bus-line. The current lead is an electrical feeder between a superconducting coil and an electrical power supply. The rated current of developed current lead is 30kA at continuous use and 100kA at short time use respectively. The advanced disk type coil is developed for the toroidal field coil and some coils are developed for critical current measurement. Superconductor is applied to the superconducting bus-line between the superconducting coils and the current leads, and the bus-line is being developed for the Large Helical Device. This report describes an abstract of these equipment. (author)

  20. LESSONS LEARNED IN TESTING OF SAFEGUARDS EQUIPMENT

    International Nuclear Information System (INIS)

    Pepper, S.; Farnitano, M.; Carelli, J.; Hazeltine, J.; Bailey, D.

    2001-01-01

    The International Atomic Energy Agency's (IAEA) Department of Safeguards uses complex instrumentation for the application of safeguards at nuclear facilities around the world. Often, this equipment is developed through cooperation with member state support programs because the Agency's requirements are unique and are not met by commercially available equipment. Before approving an instrument or system for routine inspection use, the IAEA subjects it to a series of tests designed to evaluate its reliability. In 2000, the IAEA began to observe operational failures in digital surveillance systems. In response to the observed failures, the IAEA worked with the equipment designer and manufacturer to determine the cause of failure. An action plan was developed to correct the performance issues and further test the systems to make sure that additional operational issues would not surface later. This paper addresses the steps taken to address operation issues related to digital image surveillance systems and the lessons learned during this process

  1. Consolidation equipment for irradiated nuclear fuel channels

    International Nuclear Information System (INIS)

    Taguchi, M.; Komatsu, Y.; Ose, T.

    1989-01-01

    The authors have developed and put into use a new type of mechanical consolidation equipment for irradiated nuclear fuel channels. This includes round-slice cutting of the top 100mm of the fuel channel with a guillotine cutter, and press cutting of the two corners of the remaining length of the fuel channel. Four guillotine blades work in combination with receiving blades arranged inside the fuel channel to cut the top 100mm, including the clips and spacers, of the fuel channel into a round slice. A press assembled in the consolidation equipment then presses the slice to achieve volume reduction. The press cutting operation uses two press cutting blades arranged inside the fuel channel and the receiving blades outside the fuel channel. The remaining length of fuel channel is cut off into L-shaped pieces by press cutting. This consolidation equipment is highly efficient because the round-slice cutting, pressing, and press cutting are all achieved by one unit

  2. Equipment support for the implementation of safeguards

    International Nuclear Information System (INIS)

    Arlt, R.; Bosler, G.; Goldfarb, M.; Schanfein, M.; Whichello, J.

    2001-01-01

    Full text: The provision of effective, reliable, and user-friendly equipment needed for the implementation of safeguards is one of the main objectives of the Division of Technical Services (SOTS) in the Department of Safeguards. As an outcome of a review by an independent external consultant firm, the instrumentation sections of the SGTS were reorganized in January 2001 into two new sections, the Section for NDA Systems and Seals (TNS) and Section for Installed Systems (TIE). Each section has 'cradle-to-grave' responsibilities for development, implementation, maintenance, and decommissioning of safeguards instruments and measurement systems. Unattended assay, monitoring and surveillance instruments are the responsibility of TIE while attended nondestructive assay (NDA) instruments and seals are handled by TNS. The principal goals of both sections are to define equipment requirements based on Departmental needs, to coordinate Support Programme tasks concerning development and implementation activities, to provide system engineering of commercial components, manage laboratory and to do field testing and prove system suitability for defined safeguards applications. In addition both sections coordinate equipment and supply needs for the Department, including acquisition, preparation, servicing, installation, commissioning, troubleshooting, maintenance and repair, ensuring their availability when needed. As required, TIE and TNS provide specialized field support to the Operations Divisions. Each section is working to standardize equipment as much as possible and reduce the number of instruments performing the same function. This reduces both inspector and technician training, required parts inventories, and overall life-cycle costs. Development based on User Needs from the Operations Divisions follows a strict quality control program that includes a thorough qualification testing procedure with the last phase being field-testing under actual facility conditions. A

  3. Process plant equipment operation, control, and reliability

    CERN Document Server

    Holloway, Michael D; Onyewuenyi, Oliver A

    2012-01-01

    "Process Plant Equipment Book is another great publication from Wiley as a reference book for final year students as well as those who will work or are working in chemical production plants and refinery…" -Associate Prof. Dr. Ramli Mat, Deputy Dean (Academic), Faculty of Chemical Engineering, Universiti Teknologi Malaysia "…give[s] readers access to both fundamental information on process plant equipment and to practical ideas, best practices and experiences of highly successful engineers from around the world… The book is illustrated throughout with numerous black & white p

  4. Equipment Qualification Data Base user manual

    International Nuclear Information System (INIS)

    Decker, Q.R.; Fackrell, L.J.; Fitch, L.R.; Meeky, O.B.

    1985-09-01

    This manual details the Equipment Qualification Data Base (EQDB), its usage, and contents. The EQDB consists of two files; the Plant Qualification File (PQF) and the Equipment Qualification File (EQF). The PQF contains plant specific environmental data and the EQF contains summaries of various test results. Two data management systems are used to manipulate the data and are discussed in this manual. SAS Institute System 2000 (S2K) is the management system for the PQF and Query Update (QU) is the operating system for the EQF. Each management system contains report writers. These writers and how to use them are discussed in detail in this manual

  5. Risk matrix model for rotating equipment

    Directory of Open Access Journals (Sweden)

    Wassan Rano Khan

    2014-07-01

    Full Text Available Different industries have various residual risk levels for their rotating equipment. Accordingly the occurrence rate of the failures and associated failure consequences categories are different. Thus, a generalized risk matrix model is developed in this study which can fit various available risk matrix standards. This generalized risk matrix will be helpful to develop new risk matrix, to fit the required risk assessment scenario for rotating equipment. Power generation system was taken as case study. It was observed that eight subsystems were under risk. Only vibration monitor system was under high risk category, while remaining seven subsystems were under serious and medium risk categories.

  6. Development of diaphragm automatic homing equipment

    International Nuclear Information System (INIS)

    Kobayashi, Hidetoshi; Yamada, Koji; Moriya, Shinichi; Koike, Jiro; Okabe, Masao; Oyama, Akihiro.

    1996-01-01

    In steam-turbine overhaul inspection, one of the most important processes is to remove rust and deposited contaminants on the surface of turbine parts, while the turbine is in operation, to recover thermal efficiency and prepare good surface conditions for color penetrant inspection. These processes generally are done by dry honing, but this generates dust. To protect laborers against these conditions, Hitachi, Ltd. has developed automatic honing equipment for the diaphragms of the nuclear steam turbine. This equipment was first used in the first annual inspection and overhaul of Hamaoka Nuclear Power Plant No.4 of Chubu Electric Power Inc. (author)

  7. Benefits of Digital Equipment Generic Qualification Activities

    International Nuclear Information System (INIS)

    Thomas, James E.; Steiman, Samuel C.

    2002-01-01

    As a result of nuclear power plant instrumentation and control obsolescence issues, there have been numerous activities during recent years relating to the qualification of digital equipment. Some of these activities have been 'generic' in nature in that the qualification was not limited to plant specific applications, but was intended to cover a broad base of potential applications of the digital equipment. These generic qualifications have been funded by equipment manufacturers and by utility groups and organizations. The generic activities sponsored by the Electric Power Research Institute (EPRI) have been pilot projects for an overall generic qualification approach. The primary benefit resulting from the generic qualification work to date is that a number of digital platforms and digital devices are now available for use in various nuclear safety-related applications. Many of the tests and evaluations necessary to support plant specific applications have been completed. The amount of data and documentation that each utility must develop on a case by case basis has been significantly reduced. There are also a number of additional benefits resulting from these industry efforts. The challenges and difficulties in qualifying digital equipment for safety-related applications are now more clearly understood. EPRI has published a lessons learned document (EPRI Report 1001452, Generic Qualification of Commercial Grade Digital Devices: Lessons Learned from Initial Pilots, which covers several different qualification areas, including device selection, project planning, vendor surveys and design reviews, and electromagnetic compatibility (EMC) qualification. Application of the experience and lessons learned from the EPRI pilot activities should help reduce the effort and cost required for future qualification work. Most generic qualification activities for commercial equipment have been conducted using the approach of EPRI TR-106439, Guideline on Evaluation and Acceptance

  8. Maintenence and fabrication of Electronic Equipment

    International Nuclear Information System (INIS)

    Chung, Chong Eun; Moon, Byung Soo; Hong, Suk Boong; Kim, Young Keun; Kim, Jung Bok; Lee, Sang Suk

    2004-12-01

    Development of the SPND Monitor could be the base of development of small signal processing circuits and the technique could be used to develop other precision equipment. The repair technology for high purity germanium(HPGe) detector system could be adapted to other areas where high purity detectors are used such as hospitals, universities etc. The technology of multi-channel ASIC for nuclear radiation detector, which has been imported from abroad, could be adapted to development of radiation equipment for image processing, position of detection, NDT etc., and also the technique will be expected to contribute to increase the use of radiation technology to industrial applications

  9. Radiological equipment 'Planmeca' used in dentistry

    International Nuclear Information System (INIS)

    Tuciac, Carolina

    2011-01-01

    Equipment 'Planmeca Pro Max 3D' for volumetric imaging with cone beam examine the patients under computerized tomography considering the rate 0.2-1.0 mm, digital orthopantomography, 3D cephalometry. 3D tomography image facilitates an accurate view of oral structures. It was adopted quickly, and became the basic equipment for all applications in dentistry. The Cone Beam Volumetric Tomography (CBVT), Planmeca Pro Max 3D model give the opportunity to obtain great radiological information very important for the dentist decision. (author)

  10. Conceptual design report, CEBAF basic experimental equipment

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1990-04-13

    The Continuous Electron Beam Accelerator Facility (CEBAF) will be dedicated to basic research in Nuclear Physics using electrons and photons as projectiles. The accelerator configuration allows three nearly continuous beams to be delivered simultaneously in three experimental halls, which will be equipped with complementary sets of instruments: Hall A--two high resolution magnetic spectrometers; Hall B--a large acceptance magnetic spectrometer; Hall C--a high-momentum, moderate resolution, magnetic spectrometer and a variety of more dedicated instruments. This report contains a short description of the initial complement of experimental equipment to be installed in each of the three halls.

  11. RPC industries - UV and EB equipment manufacturers

    International Nuclear Information System (INIS)

    Rodrigues, A.M.

    1987-01-01

    RPC Industries has been manufacturing electron beam and ultraviolet equipment for the industrial processing of materials for more than 15 years. RPC maintains its headquarters and electron processor manufacturing plant in Hayward, California. UV equipment is made in the company's plant near Chicago. Sales offices are maintained in New York, Illinois, and California in the USA, and in Germany, Japan, Australia, Italy, Israel, and Sweden. Complete testing and pilot facilities are available in Hayward (EB) and near Chicago (UV). Described below are the basic system components, applications and advantages of RPC's UV and EB systems. (orig.)

  12. Improvements in remote equipment torquing and fastening

    International Nuclear Information System (INIS)

    Garin, J.

    1978-01-01

    Remote torquing and fastening is a requirement of generic interest for application in an environment not readily accessible to man. The developments over the last 30 years in torque-controlled equipment above 200 nm (150 ft/lb) have not been emphasized. The development of specialized subassemblies to torque and fasten equipment in a remotely controlled environment is an integral part of the Advanced Fuel Recycle Program at Oak Ridge National Laboratory. Commercially available subassemblies have been adapted into a system that would provide remote torquing and fastening in the range of 200 to 750 nm (150 to 550 ft/lb). 9 figures

  13. Seismic qualification of non-safety class equipment whose failure would damage safety class equipment

    International Nuclear Information System (INIS)

    LaSalle, F.R.

    1991-01-01

    Both Code of Federal Regulations, Title 10, Part 50, and US Department of Energy Order 6340.1A have requirements to assess the interaction of non-safety and safety class structures and equipment during a seismic event to maintain the safety function. At the Hanford Site, a cost effective program has been developed to perform the evaluation of non-safety class equipment. Seismic qualification is performed by analysis, test, or upgrading of the equipment to ensure the integrity of safety class structures and equipment. This paper gives a brief overview and synopsis that address design analysis guidelines including applied loading, damping values, component anchorage, allowable loads, and stresses. Test qualification of equipment and walkdown acceptance criteria for heating ampersand ventilation (H ampersand V) ducting, conduit, cable tray, missile zone of influence, as well as energy criteria are presented

  14. UV Tanning Equipment | Radiation Protection | US EPA

    Science.gov (United States)

    2017-08-07

    Sun lamps and tanning equipment emit ultraviolet (UV) rays. People who are exposed to UV rays over a long period of time are more likely to develop skin cancer. People with light skin are in more danger because their skin is more sensitive to UV rays.

  15. TECHNICAL EQUIPMENT FOR SORTING APPLES BY SIZE

    Directory of Open Access Journals (Sweden)

    Vasilica Ştefan

    2012-01-01

    Full Text Available Need to increase the competitiveness of semi-subsistence farms, by valorisation of the fruits, led to research for designing of an equipment for sorting apples by size, in order to meet market requirement, pricing according to the size of the fruits.

  16. 49 CFR 374.313 - Equipment.

    Science.gov (United States)

    2010-10-01

    .... Each bus (except in commuter service) seating more than 14 passengers (not including the driver) shall..., DEPARTMENT OF TRANSPORTATION FEDERAL MOTOR CARRIER SAFETY REGULATIONS PASSENGER CARRIER REGULATIONS Adequacy of Intercity Motor Common Carrier Passenger Service § 374.313 Equipment. (a) Temperature control. A...

  17. OEE and equipment effectiveness : an evaluation

    NARCIS (Netherlands)

    Ron, de A.J.; Rooda, J.E.

    2006-01-01

    The overall equipment effectiveness or efficiency (OEE) is a metric that has been accepted in the semiconductor industry. OEE is simple and clear, and standards and guidelines have been developed. Nonetheless, the literature indicates imperfections in applying OEE with regard to the time base and

  18. Maintenance optimization plan for essential equipment reliability

    International Nuclear Information System (INIS)

    Steffen, D.H.

    1996-02-01

    The Maintenance Optimization Plan (MOP) for Essential Equipment Reliability will furnish Tank Waste Remediation System (TWRS) management with a pro-active, forward-thinking process for maintaining essential structures, systems, and components (ESSC) at the Hanford Site tank farms in their designed condition, and to ensure optimum ESSC availability and reliability

  19. EQuIP-ped for Success

    Science.gov (United States)

    Ewing, Molly

    2015-01-01

    The Educators Evaluating the Quality of Instructional Products (EQuIP) Rubric for science is a new tool for science educators that provides criteria by which to examine the alignment and overall quality of lessons and units with respect to the "Next Generation Science Standards" ("NGSS"). The rubric criteria are divided into…

  20. The LHC's equipment all in step

    CERN Multimedia

    2005-01-01

    Over 80% of the control equipment for the LHC will be connected by a special communication network known as WorldFIP, which has been chosen for its very precise timing, excellent operating performance and robustness in difficult environments. Over 350 kilometres of this network are currently being installed in the LHC tunnel and checked for compliance with the required standards.

  1. 7 CFR 3016.32 - Equipment.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Equipment. 3016.32 Section 3016.32 Agriculture Regulations of the Department of Agriculture (Continued) OFFICE OF THE CHIEF FINANCIAL OFFICER, DEPARTMENT OF AGRICULTURE UNIFORM ADMINISTRATIVE REQUIREMENTS FOR GRANTS AND COOPERATIVE AGREEMENTS TO STATE AND LOCAL...

  2. Engineering study of riser equipment contamination

    International Nuclear Information System (INIS)

    BOGER, R.M.

    1999-01-01

    This Engineering Study was to evaluate the current equipment and operating procedures to determine if changes could be made to improve ALARA and evaluate the feasibility of implementing the proposed solutions. As part of this study input from the cognizant characterization engineers and operating sampling crews was obtained and evaluated for ALARA improvements

  3. 21 CFR 226.30 - Equipment.

    Science.gov (United States)

    2010-04-01

    ... contamination, including cross-contamination from manufacturing operations. (d) Be suitably grounded... 21 Food and Drugs 4 2010-04-01 2010-04-01 false Equipment. 226.30 Section 226.30 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) DRUGS: GENERAL...

  4. New Equipping Strategies for Combat Support Hospitals

    Science.gov (United States)

    2010-01-01

    Combat and Doctrine Development and COL Timothy Lamb , supported by MAJ Gary Cooper, included members of our team in visits to Sierra Army Depot and...aspect of improving materiel stew - ardship is improving the quality of data related to the procurement, maintenance, and upgrading of equipment

  5. The first equipment for protection from nanoparticles

    International Nuclear Information System (INIS)

    Faure, Louis-Paul; Bombardier, Pierre; Reinwalt, Jean-Marie

    2009-01-01

    How can we guarantee the containment of ultrafine particles but also implement the ergonomic and handling constraints voiced by researchers? This is the equation that the engineers at FAURE INGENIERIE had to resolve to develop the first barrier protection equipment for nanoparticle research.

  6. Optimization of safety equipment outages improves safety

    International Nuclear Information System (INIS)

    Cepin, Marko

    2002-01-01

    Testing and maintenance activities of safety equipment in nuclear power plants are an important potential for risk and cost reduction. An optimization method is presented based on the simulated annealing algorithm. The method determines the optimal schedule of safety equipment outages due to testing and maintenance based on minimization of selected risk measure. The mean value of the selected time dependent risk measure represents the objective function of the optimization. The time dependent function of the selected risk measure is obtained from probabilistic safety assessment, i.e. the fault tree analysis at the system level and the fault tree/event tree analysis at the plant level, both extended with inclusion of time requirements. Results of several examples showed that it is possible to reduce risk by application of the proposed method. Because of large uncertainties in the probabilistic safety assessment, the most important result of the method may not be a selection of the most suitable schedule of safety equipment outages among those, which results in similarly low risk. But, it may be a prevention of such schedules of safety equipment outages, which result in high risk. Such finding increases the importance of evaluation speed versus the requirement of getting always the global optimum no matter if it is only slightly better that certain local one

  7. A range of equipment for dental radiography

    International Nuclear Information System (INIS)

    Bergman, G.P.M.; Clement, S.L.

    1980-01-01

    A brief review of the history of dental radiography is followed by a description of the latest Philips equipment, ranging from compact units for intra-oral radiography to advanced systems for panoramic techniques and skull radiography. The advantages of automatic exposure control and automatic film processing are also discussed. In conclusion, some probable future trends are forecast. (Auth.)

  8. 22 CFR 226.34 - Equipment.

    Science.gov (United States)

    2010-04-01

    ... Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ADMINISTRATION OF ASSISTANCE AWARDS TO U.S. NON-GOVERNMENTAL ORGANIZATIONS Post-award Requirements Property Standards § 226.34 Equipment. (a) Unless the agreement provides... to provide services to non-Federal outside organizations for a fee that is less than private...

  9. Spent fuel storage process equipment development

    International Nuclear Information System (INIS)

    Park, Hyun Soo; Lee, Jae Sol; Yoo, Jae Hyung

    1990-02-01

    Nuclear energy which is a major energy source of national energy supply entails spent fuels. Spent fuels which are high level radioactive meterials, are tricky to manage and need high technology. The objectives of this study are to establish and develop key elements of spent fuel management technologies: handling equipment and maintenance, process automation technology, colling system, and cleanup system. (author)

  10. 48 CFR 870.112 - Telecommunications equipment.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Telecommunications... DEPARTMENT SUPPLEMENTARY REGULATIONS SPECIAL PROCUREMENT CONTROLS Controls 870.112 Telecommunications... specifications for telecommunications equipment, as defined in VA manual MP-6, Part VIII (available at any VA...

  11. An Evaluation System for Foodservice Equipment

    Science.gov (United States)

    1985-10-01

    of the machine, as eggs , pancakes, etc. cannot be cooked oo a grooved surface. A grooved suriaca will be tilted towards tha grease trough for...Refrigerator Specialty Units PREPARATION EQUIPMENT Burger Forming Machine Electric Meatball Machine breading Machine Crepe Machine Breaded/Sifter

  12. Electronic detecting equipment in the Camac standard

    International Nuclear Information System (INIS)

    Basiladze, S.G.

    1981-01-01

    Basic tends of development of electron detecting equipment of modern facilities for experiments in nuclear physics are considered. Special attention is paid to developments of specialized hybrid integrated circuits, specialized processors for selection of events, usage of integrated circuits of memories in detecting units as well as to prospects of developing nuclear electronics standards [ru

  13. 78 FR 59623 - Emergency Medical Equipment

    Science.gov (United States)

    2013-09-27

    ... accordance with the FAA master minimum equipment list does not adversely affect aviation safety. This action... DEPARTMENT OF TRANSPORTATION Federal Aviation Administration 14 CFR Parts 121 and 135 [Docket No... inoperative Emergency Medical Kit (EMK) or automated external defibrillator (AED). A copy of Master Minimum...

  14. 7 CFR 3019.34 - Equipment.

    Science.gov (United States)

    2010-01-01

    ... EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Property Standards § 3019... accounting records shall be investigated to determine the causes of the difference. The recipient shall, in... requirement for the equipment exists in other Federal agencies. The Federal awarding agency shall issue...

  15. 24 CFR 84.34 - Equipment.

    Science.gov (United States)

    2010-04-01

    ... ADMINISTRATIVE REQUIREMENTS FOR GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER... the physical inspection and those shown in the accounting records shall be investigated to determine... requirement for the equipment exists in other Federal agencies. HUD shall issue instructions to the recipient...

  16. A Guide for Equipping Industrial Arts Facilities.

    Science.gov (United States)

    American Industrial Arts Association, Washington, DC. Equipment Guide Committee.

    A guide for planning new and revising existing industrial arts facilities which gives a listing of tools and equipment recommended for each of the major areas of instruction (automotive and power mechanics, ceramics, drafting, electronics, elementary, general shop, graphic arts, metalworking, plastics, and woodworking). General descriptions and…

  17. Radiation protection calculations for diagnostic medical equipment

    International Nuclear Information System (INIS)

    Klueter, R.

    1992-01-01

    The standards DIN 6812 and DIN 6844 define the radiation protection requirements to be met by biomedical radiography equipment or systems for nuclear medicine. The paper explains the use of a specific computer program for radiation protection calculations. The program offers menu-controlled calculation, with free choice of the relevant nuclides. (DG) [de

  18. Equipment qualification testing - a practical approach

    International Nuclear Information System (INIS)

    Davies, G.A.; McDougall, R.I.; Poirier, M.P.

    1996-01-01

    When nuclear safety equipment is credited with a Required Safety Function it must properly perform that function to facilitate safe control and/or shutdown of the plant during a design basis accident. When such equipment is required to be environmentally (EQ) and/or seismically qualified (SQ) for safety related use in CANDU nuclear power plants, the preferred method of qualification is by type testing. The qualification testing process requires that the test specimen equipment be subjected to the aging stressors associated with the normal service conditions that it would experience during it's required qualified (or service) life. Following the aging process, the test specimen is in a condition representative of that in which it would be at the end of its service life in the plant. The test specimen is then subjected to a simulated accident during which it must satisfy performance requirements thereby demonstrating that it can perform its required safety function. The performance requirements specified for the qualification testing must be designed to ensure that satisfactory performance of the safety function is demonstrated during the qualification program. This paper provides descriptions of practical methods used in the deriving and satisfying of relevant performance requirements during the qualification testing of safety related equipment. (author)

  19. Magnet measuring equipment of SC2

    CERN Multimedia

    CERN PhotoLab

    1974-01-01

    Checking the positioning of the magnet measuring equipment installed between the poles of SC2. The steel structure in front of the magnet is designed to house the rotary condenser and to shield it from the stray magnetic field of the accelerator.

  20. Magnet measuring equipment of SC2

    CERN Multimedia

    1974-01-01

    Checking the positioning of the magnet measuring equipment installed between the poles of SC2. The steel structure in front of the magnet is designed to house the rotary condenser and to shield it from the stray magnetic field of the accelerator. On the left, Marinus van Gulik. (See Photo Archive 7402005 and Annual Report 1974, p. 44.)

  1. USING DIDACTIC EQUIPMENT IN VOCATIONAL SUBJECTS TEACHING

    OpenAIRE

    JIROUT, Jiří

    2011-01-01

    Baccalaureate Work ?Using Didactic Equipment In Vocational Subjects Teaching? describes various methods of teaching and using didactic engineering in education. Theoretic part describes general aspects of using didactic engineering, teaching methods a and ways how to use didactic engineering in teaching vocational subjects. Practical part finds how students appreciate using modern didactic aids and engineering in education.

  2. Robust control investigations for equipment loaded panels

    DEFF Research Database (Denmark)

    Aglietti, G.S.; Langley, R.S.; Rogers, E.

    1998-01-01

    This paper develops a modelling technique for equipment load panels which directly produces (adequate) models of the underlying dynamics on which to base robust controller design/evaluations. This technique is based on the use of the Lagrange's equations of motion and the resulting models...

  3. The first equipment for protection from nanoparticles

    Energy Technology Data Exchange (ETDEWEB)

    Faure, Louis-Paul; Bombardier, Pierre; Reinwalt, Jean-Marie [FAURE INGENIERIE S.A., Parc Technologique des Fontaines, Chemin des Fontaines, F-38190 Bernin (France)], E-mail: laboratoire@faureingenierie.com

    2009-05-01

    How can we guarantee the containment of ultrafine particles but also implement the ergonomic and handling constraints voiced by researchers? This is the equation that the engineers at FAURE INGENIERIE had to resolve to develop the first barrier protection equipment for nanoparticle research.

  4. Longevity and Depreciation of Audiovisual Equipment.

    Science.gov (United States)

    Post, Richard

    1987-01-01

    Describes results of survey of media service directors at public universities in Ohio to determine the expected longevity of audiovisual equipment. Use of the Delphi technique for estimates is explained, results are compared with an earlier survey done in 1977, and use of spreadsheet software to calculate depreciation is discussed. (LRW)

  5. Design of experimental equipment at CRNL

    International Nuclear Information System (INIS)

    Godden, B.

    1976-01-01

    The Plant Design Division provides a design service to the research and development effort at CRNL. Severe constraints, both environmentally and spatially, are placed on the design of special equipment. Several examples are given. Finally, the use of automated drafting systems is described. (author)

  6. Mechanical equipment for magnet measurement and alignment

    International Nuclear Information System (INIS)

    Harvey, A.

    1992-05-01

    The mechanical equipment for measuring and aligning (or fiducializing) magnets is described by reference to devices designed and built by a number of laboratories. Some of these are now available commercially. The descriptions are supplemented by a list of representative sources of hardware

  7. Diagnosis of Equipment Failures by Pattern Recognition

    DEFF Research Database (Denmark)

    Pau, L. F.

    1974-01-01

    The main problems in relation to automatic fault finding and diagnosis in equipments or production systems are discussed: 1) compression of the syndrome and observation spaces for better discrimination between failure modes; 2) simultaneous display of the failure patterns and the failure instants...

  8. 36 CFR 1210.34 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... 1210.34 Parks, Forests, and Public Property NATIONAL ARCHIVES AND RECORDS ADMINISTRATION GENERAL RULES... data, including date of disposal and sales price or the method used to determine current fair market... the following standards. For equipment with a current per unit fair market value of $5,000 or more...

  9. Gamma scanning equipment for nuclear safeguards

    International Nuclear Information System (INIS)

    De Grandi, G.; Stanchi, L.

    1975-01-01

    Many reasons justify the use of gamma techniques in the field of nuclear safeguards. The paper describes electronic equipment for gamma-scanning of non-irradiated fuel elements. The control of the operation is completely digital and driven by a minicomputer and gives more accurate results in respect of an analog chain which has been successfully used in fuel element manufacturing plants

  10. Automated technological equipment-robot complexes

    International Nuclear Information System (INIS)

    Zhitomirskii, S.V.; Samorodskikh, B.L.

    1984-01-01

    This paper surveys the types of automated technological equipment robot complexes. The principal elements of such complexes are described. Complexes are divided into two principal groups: those using simultaneously acting robots, and those using successively acting robots. The great variety of types of robots using successive action is then described

  11. 14 CFR 125.355 - Airplane equipment.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Airplane equipment. 125.355 Section 125.355...: AIRPLANES HAVING A SEATING CAPACITY OF 20 OR MORE PASSENGERS OR A MAXIMUM PAYLOAD CAPACITY OF 6,000 POUNDS OR MORE; AND RULES GOVERNING PERSONS ON BOARD SUCH AIRCRAFT Flight Release Rules § 125.355 Airplane...

  12. 21 CFR 1020.32 - Fluoroscopic equipment.

    Science.gov (United States)

    2010-04-01

    ... manufacturer shall provide to users, under § 1020.30(h)(1)(i), precautions concerning the importance of remote... specified in § 1020.32(d)(1)(v). (iii) Equipment provided with both an AERC mode and a manual mode shall not... shall be operable only when continuous manual activation is provided by the operator. A continuous...

  13. Image quality analysis of digital mammographic equipments

    Energy Technology Data Exchange (ETDEWEB)

    Mayo, P.; Pascual, A.; Verdu, G. [Valencia Univ. Politecnica, Chemical and Nuclear Engineering Dept. (Spain); Rodenas, F. [Valencia Univ. Politecnica, Applied Mathematical Dept. (Spain); Campayo, J.M. [Valencia Univ. Hospital Clinico, Servicio de Radiofisica y Proteccion Radiologica (Spain); Villaescusa, J.I. [Hospital Clinico La Fe, Servicio de Proteccion Radiologica, Valencia (Spain)

    2006-07-01

    The image quality assessment of a radiographic phantom image is one of the fundamental points in a complete quality control programme. The good functioning result of all the process must be an image with an appropriate quality to carry out a suitable diagnostic. Nowadays, the digital radiographic equipments are replacing the traditional film-screen equipments and it is necessary to update the parameters to guarantee the quality of the process. Contrast-detail phantoms are applied to digital radiography to study the threshold contrast detail sensitivity at operation conditions of the equipment. The phantom that is studied in this work is C.D.M.A.M. 3.4, which facilitates the evaluation of image contrast and detail resolution. One of the most extended indexes to measure the image quality in an objective way is the Image Quality Figure (I.Q.F.). This parameter is useful to calculate the image quality taking into account the contrast and detail resolution of the image analysed. The contrast-detail curve is useful as a measure of the image quality too, because it is a graphical representation in which the hole thickness and diameter are plotted for each contrast-detail combination detected in the radiographic image of the phantom. It is useful for the comparison of the functioning of different radiographic image systems, for phantom images under the same exposition conditions. The aim of this work is to study the image quality of different images contrast-detail phantom C.D.M.A.M. 3.4, carrying out the automatic detection of the contrast-detail combination and to establish a parameter which characterize in an objective way the mammographic image quality. This is useful to compare images obtained at different digital mammographic equipments to study the functioning of the equipments. (authors)

  14. Image quality analysis of digital mammographic equipments

    International Nuclear Information System (INIS)

    Mayo, P.; Pascual, A.; Verdu, G.; Rodenas, F.; Campayo, J.M.; Villaescusa, J.I.

    2006-01-01

    The image quality assessment of a radiographic phantom image is one of the fundamental points in a complete quality control programme. The good functioning result of all the process must be an image with an appropriate quality to carry out a suitable diagnostic. Nowadays, the digital radiographic equipments are replacing the traditional film-screen equipments and it is necessary to update the parameters to guarantee the quality of the process. Contrast-detail phantoms are applied to digital radiography to study the threshold contrast detail sensitivity at operation conditions of the equipment. The phantom that is studied in this work is C.D.M.A.M. 3.4, which facilitates the evaluation of image contrast and detail resolution. One of the most extended indexes to measure the image quality in an objective way is the Image Quality Figure (I.Q.F.). This parameter is useful to calculate the image quality taking into account the contrast and detail resolution of the image analysed. The contrast-detail curve is useful as a measure of the image quality too, because it is a graphical representation in which the hole thickness and diameter are plotted for each contrast-detail combination detected in the radiographic image of the phantom. It is useful for the comparison of the functioning of different radiographic image systems, for phantom images under the same exposition conditions. The aim of this work is to study the image quality of different images contrast-detail phantom C.D.M.A.M. 3.4, carrying out the automatic detection of the contrast-detail combination and to establish a parameter which characterize in an objective way the mammographic image quality. This is useful to compare images obtained at different digital mammographic equipments to study the functioning of the equipments. (authors)

  15. Riser equipment decontamination engineering task plan; TOPICAL

    International Nuclear Information System (INIS)

    BOGER, R.M.

    1999-01-01

    On October 15, 1998, two Characterization Project Operations (CPO) employees were found to have contaminated clothing. An operator had 300,000-dpm/100cm2 beta/gamma, no alpha, contamination on his coat sleeve and a Radiation Control Technician (RCT) had 10,000 dpm/100cm2 beta/gamma, no alpha, on his shirt sleeve. The CPO swing shift crew was working in TX tank farm, performing sampling activities at 241-TX-113. TX tank farm is a ''clean farm'' and does not require anti-contamination clothing for entry. The CPO personnel were dressed in normal work clothes. An operator and an RCT were performing a pre-job survey that involved removing bagging around the riser equipment. When the RCT saw that the contamination readings from smear samples of the riser equipment were greater than expected, the job was suspended. Crew members were then directed to areas of lower background radiation for personnel surveys. During personnel surveys, reportable contamination was found on the coat sleeve of the operator who had been involved in the pre-job survey and on the shirt sleeve of the RCT who had been involved in the pre-job survey. No other personnel were found to be contaminated. Because of this off normal event Characterization Engineering was given the following corrective action: Examine the process methodology used for core sampling operations to determine practicality and potential long-term advantages of reducing personnel contact with contaminated equipment. This Engineering Task Plan ensures that LMHC 1998a, Corrective Action No.7 is completely addressed by Characterization Engineering. The deliverable is an Engineering Study that evaluates decontamination of riser equipment components and considers additional engineered features to reduce potential exposure to workers operating the riser equipment. This engineering study shall also address any released design features that have failed to be implemented

  16. Riser equipment decontamination engineering task plan

    International Nuclear Information System (INIS)

    BOGER, R.M.

    1999-01-01

    On October 15, 1998, two Characterization Project Operations (CPO) employees were found to have contaminated clothing. An operator had 300,000-dpm/100cm2 beta/gamma, no alpha, contamination on his coat sleeve and a Radiation Control Technician (RCT) had 10,000 dpm/100cm2 beta/gamma, no alpha, on his shirt sleeve. The CPO swing shift crew was working in TX tank farm, performing sampling activities at 241-TX-113. TX tank farm is a ''clean farm'' and does not require anti-contamination clothing for entry. The CPO personnel were dressed in normal work clothes. An operator and an RCT were performing a pre-job survey that involved removing bagging around the riser equipment. When the RCT saw that the contamination readings from smear samples of the riser equipment were greater than expected, the job was suspended. Crew members were then directed to areas of lower background radiation for personnel surveys. During personnel surveys, reportable contamination was found on the coat sleeve of the operator who had been involved in the pre-job survey and on the shirt sleeve of the RCT who had been involved in the pre-job survey. No other personnel were found to be contaminated. Because of this off normal event Characterization Engineering was given the following corrective action: Examine the process methodology used for core sampling operations to determine practicality and potential long-term advantages of reducing personnel contact with contaminated equipment. This Engineering Task Plan ensures that LMHC 1998a, Corrective Action No.7 is completely addressed by Characterization Engineering. The deliverable is an Engineering Study that evaluates decontamination of riser equipment components and considers additional engineered features to reduce potential exposure to workers operating the riser equipment. This engineering study shall also address any released design features that have failed to be implemented

  17. 7 CFR 1753.68 - Purchasing special equipment.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Purchasing special equipment. 1753.68 Section 1753.68... AGRICULTURE TELECOMMUNICATIONS SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Purchase and Installation of Special Equipment § 1753.68 Purchasing special equipment. (a) General. (1) Equipment purchases are...

  18. 14 CFR 25.1441 - Oxygen equipment and supply.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Oxygen equipment and supply. 25.1441... Oxygen equipment and supply. (a) If certification with supplemental oxygen equipment is requested, the... oxygen available in each source of supply. (d) The oxygen flow rate and the oxygen equipment for...

  19. 30 CFR 72.520 - Diesel equipment inventory.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Diesel equipment inventory. 72.520 Section 72... Mines § 72.520 Diesel equipment inventory. (a) The operator of each mine that utilizes diesel equipment underground, shall prepare and submit in writing to the District Manager, an inventory of diesel equipment...

  20. 23 CFR 635.106 - Use of publicly owned equipment.

    Science.gov (United States)

    2010-04-01

    ... CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.106 Use of publicly owned equipment. (a) Publicly owned equipment should not normally compete with privately owned equipment on a project to be let to contract... publicly owned equipment is to be made available in connection with construction work to be let to contract...

  1. 33 CFR 105.250 - Security systems and equipment maintenance.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Security systems and equipment... systems and equipment maintenance. (a) Security systems and equipment must be in good working order and... include procedures for identifying and responding to security system and equipment failures or...

  2. 33 CFR 104.260 - Security systems and equipment maintenance.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Security systems and equipment... systems and equipment maintenance. (a) Security systems and equipment must be in good working order and... procedures for identifying and responding to security system and equipment failures or malfunctions. ...

  3. 46 CFR 32.90-1 - Pilot boarding equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 1 2010-10-01 2010-10-01 false Pilot boarding equipment. 32.90-1 Section 32.90-1... REQUIREMENTS Pilot Boarding Equipment § 32.90-1 Pilot boarding equipment. (a) This section applies to each... must have suitable pilot boarding equipment available for use on each side of the vessel. If a vessel...

  4. 46 CFR 96.40-1 - Pilot boarding equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Pilot boarding equipment. 96.40-1 Section 96.40-1... CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Pilot Boarding Equipment § 96.40-1 Pilot boarding... boat or other vessel. (b) Each vessel must have suitable pilot boarding equipment available for use on...

  5. 46 CFR 195.40-1 - Pilot boarding equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Pilot boarding equipment. 195.40-1 Section 195.40-1... CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Pilot Boarding Equipment § 195.40-1 Pilot boarding... boat or other vessel. (b) Each vessel must have suitable pilot boarding equipment available for use on...

  6. 45 CFR 95.707 - Equipment management and disposition.

    Science.gov (United States)

    2010-10-01

    ... participation in the costs of replacement equipment shall be limited to the additional outlay. (4) If the... 45 Public Welfare 1 2010-10-01 2010-10-01 false Equipment management and disposition. 95.707... PROGRAMS) Equipment Acquired Under Public Assistance Programs § 95.707 Equipment management and disposition...

  7. 32 CFR 34.21 - Real property and equipment.

    Science.gov (United States)

    2010-07-01

    ... original equipment as trade-in or sell it and use the proceeds to offset the costs of the replacement... request approval to use equipment as trade-in or offset for replacement equipment (see paragraph (e)(1)(i... 32 National Defense 1 2010-07-01 2010-07-01 false Real property and equipment. 34.21 Section 34.21...

  8. 24 CFR 965.306 - Energy conservation equipment and practices.

    Science.gov (United States)

    2010-04-01

    ... Measures § 965.306 Energy conservation equipment and practices. In purchasing original or, when needed, replacement equipment, PHAs shall acquire only equipment that meets or exceeds the minimum efficiency... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Energy conservation equipment and...

  9. 40 CFR 63.1363 - Standards for equipment leaks.

    Science.gov (United States)

    2010-07-01

    ... the replacement equipment and the actual date of delivery of the replacement equipment. (E) The date... heavy liquid service. Information, data, and analysis used to determine that a piece of equipment or... 40 Protection of Environment 11 2010-07-01 2010-07-01 true Standards for equipment leaks. 63.1363...

  10. 46 CFR 117.175 - Survival craft equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Survival craft equipment. 117.175 Section 117.175... AND ARRANGEMENTS Survival Craft Arrangements and Equipment § 117.175 Survival craft equipment. (a) General. Each item of survival craft equipment must be of good quality, and efficient for the purpose it...

  11. 7 CFR 58.419 - Curd mill and miscellaneous equipment.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 3 2010-01-01 2010-01-01 false Curd mill and miscellaneous equipment. 58.419 Section... Service 1 Equipment and Utensils § 58.419 Curd mill and miscellaneous equipment. Knives, hand rakes... of the curd mill should be of stainless steel. All pieces of equipment shall be so constructed that...

  12. 41 CFR 109-50.4801 - Equipment Gift Agreement.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Equipment Gift Agreement... 50-SPECIAL DOE DISPOSAL AUTHORITIES 50.48-Exhibits § 109-50.4801 Equipment Gift Agreement. (a) The following Equipment Gift Agreement format will be used to provide gifts of excess and/or surplus equipment...

  13. 30 CFR 77.410 - Mobile equipment; automatic warning devices.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Mobile equipment; automatic warning devices. 77... UNDERGROUND COAL MINES Safeguards for Mechanical Equipment § 77.410 Mobile equipment; automatic warning devices. (a) Mobile equipment such as front-end loaders, forklifts, tractors, graders, and trucks, except...

  14. 47 CFR 36.126 - Circuit equipment-Category 4.

    Science.gov (United States)

    2010-10-01

    ... separating property associated with special services, circuit equipment included in Categories 4.12 (other... Equipment Excluding Wideband—Category 4.13—The cost of Circuit Equipment associated with exchange line plant... 47 Telecommunication 2 2010-10-01 2010-10-01 false Circuit equipment-Category 4. 36.126 Section 36...

  15. 49 CFR 238.230 - Safety appliances-new equipment.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Safety appliances-new equipment. 238.230 Section... I Passenger Equipment § 238.230 Safety appliances—new equipment. (a) Applicability. This section..., 2007, that is equipped with a safety appliance, required by the “manner of application” provisions in...

  16. Three equipment concepts for the Fusion Engineering Device

    International Nuclear Information System (INIS)

    Spampinato, P.T.; Masson, L.S.; Watts, K.D.; Grant, N.R.; Kuban, D.P.

    1982-01-01

    Maintenance equipment which is needed to remotely handle fusion device components is being conceptually developed for the Fusion Engineering Design Center. This will test the assumption that these equipment needs can be satisfied by present technology. In addition, the development of equipment conceptual designs will allow for cost estimates which have a much higher degree of certainty. Accurate equipment costs will be useful for assessments which trade off gains in availability as a function of increased investments in maintenance equipment

  17. A complex method of equipment replacement planning. An advanced plan for the replacement of medical equipment.

    Science.gov (United States)

    Dondelinger, Robert M

    2004-01-01

    This complex method of equipment replacement planning is a methodology; it is a means to an end, a process that focuses on equipment most in need of replacement, rather than the end itself. It uses data available from the maintenance management database, and attempts to quantify those subjective items important [figure: see text] in making equipment replacement decisions. Like the simple method of the last issue, it is a starting point--albeit an advanced starting point--which the user can modify to fit their particular organization, but the complex method leaves room for expansion. It is based on sound logic, documented facts, and is fully defensible during the decision-making process and will serve your organization well as provide a structure for your equipment replacement planning decisions.

  18. Equipment abnormality monitoring method and device therefor

    International Nuclear Information System (INIS)

    Yamada, Izumi; Asakura, Yamato; Uemura, Hiroshi; Uchida, Shunsuke; Oyamada, Osamu; Oyobe, Koji.

    1994-01-01

    In the present invention, it is judged whether the operation state of equipments used in a plant are normal or not by using learning performances. That is, a plurality of monitoring parameters are measured for an equipment. Previously determined monitoring parameters are extracted. A leaning mode or a monitoring mode is selected. In the leaning mode, based on the values of previously determined monitoring parameters, values of other monitoring parameters during normal states are learned. In the monitoring mode, based on the values of the previously determined monitoring parameters, typical values of other leaned monitoring parameters are outputted. The typical values of other normal monitoring parameters after learning and the values of other parameters at the present time are compared. If the values of the other parameters at the present time are out of normal range, it is judged as abnormal, and the result is alarmed and displayed. (I.S.)

  19. Guide to optimized replacement of equipment seals

    International Nuclear Information System (INIS)

    Gleason, J.F.

    1990-03-01

    A reevaluation of current scheduled replacement intervals of polymeric seals in plant equipment can achieve significant benefits. Information is provided which has the potential for increasing replacement intervals based on better information on how seals have performed through unique nuclear industry tests to qualify equipment, improved elastomers and increased knowledge of the failure mechanisms and related performance. The research was performed by reviewing applications of elastomeric seals in nuclear plants and practice associated with defining seal replacement intervals in the nuclear power and other industries. Performance indicators and how they predict degradation of seals were evaluated. Guidelines and a flow chart for reevaluating seal replacement intervals are provided. 29 refs., 38 figs., 8 tabs

  20. Space station wardroom habitability and equipment study

    Science.gov (United States)

    Nixon, David; Miller, Christopher; Fauquet, Regis

    1989-01-01

    Experimental designs in life-size mock-up form for the wardroom facility for the Space Station Habitability Module are explored and developed. In Phase 1, three preliminary concepts for the wardroom configuration are fabricated and evaluated. In Phase 2, the results of Phase 1 are combined with a specific range of program design requirements to provide the design criteria for the fabrication of an innovative medium-fidelity mock-up of a wardrobe configuration. The study also focuses on the design and preliminary prototyping of selected equipment items including crew exercise compartments, a meal/meeting table and a portable workstation. Design criteria and requirements are discussed and documented. Preliminary and final mock-ups and equipment prototypes are described and illustrated.

  1. High temperature superconducting Maglev equipment on vehicle

    Science.gov (United States)

    Wang, S. Y.; Wang, J. S.; Ren, Z. Y.; Zhu, M.; Jiang, H.; Wang, X. R.; Shen, X. M.; Song, H. H.

    2003-04-01

    Onboard high temperature superconducting (HTS) Maglev equipment is a heart part of a HTS Maglev vehicle, which is composed of YBaCuO bulks and rectangle-shape liquid nitrogen vessel and used successfully in the first manned HTS Maglev test vehicle. Arrangement of YBaCuO bulks in liquid nitrogen vessel, structure of the vessel, levitation forces of a single vessel and two vessels, and total levitation force are reported. The first manned HTS Maglev test vehicle in the world has operated well more than one year after it was born on Dec. 31, 2000, and more than 23,000 passengers have taken the vehicle till now. Well operation of more than one year proves the reliability of the onboard HTS Maglev equipment.

  2. Maintenance or replacement of primary equipments

    International Nuclear Information System (INIS)

    Branchu, J.

    1995-01-01

    The principal materials, such as the primary equipments of a PWR type steam generator, have a finite service life. Framatome, builder of steam generators and maintenance contractor of Electricite de France has developed a methodology for the maintenance or the replacement of primary equipments. The paper describes the methodology followed by Framatome to identify and localize the wear mode and to treat or repair the component. Four failure modes have been considered: crack propagation, rubbing/vibration wear, neutron irradiation and corrosion propagation under permanent stress. A kinetic modelling of wear propagation has been computerized and validated using mechanical tests on Inconel 600 mockups. These analyses have allow to determine the strategy of repair or replacement of vessel heads for each unit. The method is evaluated taking into account the risk assessment, cost, dosimetry, efficiency and time delay involved. (J.S.). 1 fig., 3 photos

  3. Plant equipment services with laser metrology

    International Nuclear Information System (INIS)

    Hayes, J.H.; Kreitman, P.J.

    1995-01-01

    A new industrial metrology process is now being applied to support PWR Nuclear Plant Steam Generator Replacement Projects. The method uses laser tracking interferometry to perform as built surveys of existing and replacement plant equipment. This method provides precision data with a minimum of setup when compared to alternative methods available. In addition there is no post processing required to ascertain validity. The data is obtained quickly, processed in real time and displayed during the survey in the desired coordinate system. These capabilities make this method of industrial measure ideal for various data acquisition needs throughout the power industry, from internal/external equipment templating to area mapping. Laser tracking interferometry is an improvement on the present use of optical instruments and surveying technique. In order to describe the laser tracking interferometry measurement process, previous methods of templating and surveying are first reviewed

  4. Excavating and loading equipment for peat mining

    Science.gov (United States)

    Mikhailov, A. V.; Zhigulskaya, A. I.; Yakonovskaya, T. B.

    2017-10-01

    Recently, the issues of sustainable development of Russian regions, related to ensuring energy security, are more urgent than ever. To achieve sustainable development, an integrated approach to the use of local natural resources is needed. Practically in all north regions of the Russian Federation, peat as a local natural resource is widespread, which has a practical application in the area of housing services. The paper presents the evaluation of technologies for open-pit peat mining, as well as analysis of technological equipment for peat production. Special attention is paid to a question of peat materials excavating and loading. The problem of equipment selection in a peat surface mine is complex. Many features, restrictions and criteria need to be considered. Use of low and ultra-low ground pressure excavators and low ground pressure front-end loaders with full-range tires to provide the necessary floatation in the peat bog environment is offered.

  5. Low activation diagnostic equipment design studies

    International Nuclear Information System (INIS)

    Hopkins, G.R.; Cheng, E.T.; Fisher, R.K.

    1985-01-01

    The low activation fusion concept has been applied to the diagnostic equipment in a fusion reactor. The components where fabrication from low activation materials is feasible have been identified. Other systems where higher activation elements are required can have their activation reduced by design approaches which include shielding and operation only in low flux regions of the reactor. Some components will not operate in a high flux so activation is not a major concern. This low activation diagnostic equipment study completes a series of low activation studies where all the components in a fusion power reactor have now been evaluated. It is concluded that a completely low activation fusion reactor is feasible with all components meeting the functional requirements. This provides an environmentally benign energy source with a high confidence level in meeting safety criteria in operation, maintenance and waste disposal

  6. Failure diagnosis aiding device for plant equipment

    International Nuclear Information System (INIS)

    Uhara, Yoshihiko.

    1990-01-01

    The present invention intends to improve the efficiency of trouble shooting for equipments of industrial plants such as nuclear power plants. The device of the present invention comprises an intelligence base and an inference mechanism base. The intelligence base comprises a rule base, an information storing section having a part frame and a working frame and a user's frame. The parts frame contains the failure rate on every parts and data on related operations. The working frame contains the importance and frequency of working. The user's frame contains parameters showing the extent of user's skills. The rule base, the parts frame and the working frame can be selected in accordance with the extent of the user's skill in the inference mechanism. With such a constitution, failures can be checked with the intelligence base in accordance with the knowledges for the failures of the equipments and the extent of user's skill by way of the inference mechanism. (I.S.)

  7. Development of Partial Discharging Simulation Test Equipment

    Science.gov (United States)

    Kai, Xue; Genghua, Liu; Yan, Jia; Ziqi, Chai; Jian, Lu

    2017-12-01

    In the case of partial discharge training for recruits who lack of on-site work experience, the risk of physical shock and damage of the test equipment may be due to the limited skill level and improper operation by new recruits. Partial discharge simulation tester is the use of simulation technology to achieve partial discharge test process simulation, relatively true reproduction of the local discharge process and results, so that the operator in the classroom will be able to get familiar with and understand the use of the test process and equipment.The teacher sets up the instrument to display different partial discharge waveforms so that the trainees can analyze the test results of different partial discharge types.

  8. Test and Analysis of Metallurgical Converter Equipment

    Directory of Open Access Journals (Sweden)

    Shan Pang

    2013-05-01

    Full Text Available Oxygen top-blow converter is the main equipment in steel making, and its work reliability decides the security and economy of steel production. Therefore, how to design and test analysis of convertor has been an important subject of industry research. Geometric modelling and structure analysis of converter tilting device by using Pro/E program .The design Principle, basic design structure were analyzed in detail. The computer simulation software of metallurgical converter equipment and how to use it were introduced .It developed by VC++ software. The position of barycentre and moment curve in No.3 and No.4 are calculated. The converter acceleration down dip can be resolved by comparing the moment curve and center curve.

  9. Donation of CERN computing equipment to Pakistan

    CERN Document Server

    Anaïs Schaeffer

    2015-01-01

    An official ceremony marking the eighth donation of CERN computing equipment to an outside institute, this time a university in Pakistan, took place on Monday, 2 March.     From left to right: Sajjad Mohsin, Dean at the COMSATS Institute of Information Technology (CIIT), Rolf Heuer, CERN Director-General, S. M. Junaid Zaidi, Rector of CIIT, Aumair Qayyum (CIIT) and Syed Ali Zahir Bukhari (CIIT).   On this occasion, 224 servers and 30 network hubs were donated to the CIIT (COMSATS Institute of Information Technology) in Islamabad, Pakistan, where they will be used by scientists working on the LHC’s ALICE experiment. For several years now, CERN has regularly donated computing equipment that no longer meets its highly specific requirements but is still more than adequate for less exacting environments. To date, a total of 1,149 servers and 79 hubs have been donated to eight countries, namely Bulgaria, Egypt, Ghana, Morocco, the Philippines, Senegal, Serbia and now P...

  10. Towards comfortable and efficient man-machine interaction in the cabins of vehicles

    NARCIS (Netherlands)

    Looze, M.P. de; Roetting, M.; Vink, P.; Luczak, H.

    2000-01-01

    The comfort of the operators in the cabins of vehicles is getting an increasingly important issue. At first glance, the cabins of professional machines (earth-moving equipment, busses, harvesting equipment) might look modern and highly comfortable. However, this does not imply that the cabins

  11. Use of commercial grade equipment and industrial standards for equipment qualification

    International Nuclear Information System (INIS)

    Gradin, L.P.; Muller, E.S.

    1984-01-01

    One of the most controversial issues is the proper application of Arrhenius aging methodology. Naturally and artificially aged equipment used in type test programs are often costly and burdensome tasks. Appropriate use of non-nuclear industrial standards and comparison to past history can demonstrate, with reasonable assurance, that equipment is qualified with proper consideration of aging. Specific review of the industrial standards available and application examples are provided

  12. Equipment for collecting samples of radioactive solutions

    International Nuclear Information System (INIS)

    Raggenbass, A.; Fradin, J.; Joubert, G.

    1958-01-01

    The authors present an equipment aimed at collecting samples of fission products to perform radio-chemical analysis. As the sample must have a total activity between 1 and 50 micro-Curie, this installation comprises a sampling system and a dilution device which aims at bringing the sample to the suitable activity. Samples are collected by means of needles. The sample reproducibility is discussed. The dilution device is described

  13. Material Handling Equipment Evaluation for Crater Repair

    Science.gov (United States)

    2016-11-01

    lifting (www.mcneiluscompanies.com). Agricultural/Mechanical Industry. The final equipment solution investigated was a telescoping boom crane (see... crane include: • Trailer-tongue mounting would provide for self-contained lifting capabilities on the simplified volumetric mixer. • Some models are...jib crane could potentially be effective as integrating lifting capabilities with the current simplified volumetric mixer. Both options could be

  14. Equipment Obsolescence Analysis and Management Software

    Energy Technology Data Exchange (ETDEWEB)

    Redmond, J.; Carret, L.; Shaon, S.; Schultz, C.

    2015-07-01

    The procurement engineering resources at Nuclear Power Plants (NPPs) are experiencing increasing backlog for procurement items primarily due to the inability to order the original replacement parts. The level of effort and time required to prepare procurement packages is increasing since the number of obsolete parts are increasing exponentially. Procurement packages for obsolete components and parts are much more complex and take more time to prepare because of the need to perform equivalency evaluations, testing requirements and test acceptance criteria development, commercial grade dedication or equipment qualification, and increasing efforts to verify that no fraudulent or counterfeit parts are procured. This problem will be further compounded when NPPs pursue license renewal and approval for plant-life extension. Advanced planning and advanced knowledge of equipment obsolescence is required to allow for sufficient time to properly procure replacement parts for obsolete items. The uncertain supply chain capability due to obsolescence is a real problem and can cause a risk to reliable plant operations due to the potential for a lack of available spare parts and replacement components to support outages and unplanned component failures. Advanced notification of obsolescence is increasingly more important to ensure that adequate time and planning is scheduled to procure the proper replacement parts. A thorough analysis of Original Equipment Manufacturer (OEM) availability and inventory as well as an analysis of failure rates and usage rates is required to predict critical part needs to allow for early identification of obsolescence issues so that a planned and controlled strategy to qualify replacement equipment can be implemented. (Author)

  15. Installation equipment for a glove box

    International Nuclear Information System (INIS)

    Loriot, P.

    1993-01-01

    The equipment uses a hollow support on which the glove to be replaced is mounted. It carries two grooves to ensure that the edges of the new and used glove are securely held in position. The new glove is temporarily fitted to a mounting ring using a mounting jig which stretches the edge of the new glove around its rim. The mounting ring is then positioned over the hollow support and the edge of the glove transferred onto it. (author)

  16. Laser alignment of rotating equipment at PNL

    International Nuclear Information System (INIS)

    Berndt, R.H.

    1994-05-01

    Lateral vibration in direct-drive equipment is usually caused by misalignment. Over the years, because of the need to improve on techniques and ways of working more efficiently, various types of alignment methods have evolved. In the beginning, craftsmen used a straight-edge scale across the coupling with a feeler gauge measuring the misalignment error. This is still preferred today for aligning small couplings. The industry has since decided that alignment of large direct-drive equipment needed a more accurate type of instrumentation. Rim and face is another of the first alignment methods and is used on all sizes of equipment. A disadvantage of the rim and face method is that in most cases the coupling has to be disassembled. This can cause alignment problems when the coupling is reassembled. Also, the rim and face method is not fast enough to work satisfactorily on alignment of thermally hot equipment. Another concern is that the coupling has to be manufactured accurately for correct rim and face readings. Reverse dial alignment is an improvement over the rim and face method, and depending on the operator's experience, this method can be very accurate. A good training program along with field experience will bring the operator to a proper level of proficiency for a successful program. A hand-held computer with reverse dial calculations in memory is a must for job efficiency. An advantage over the rim and face method is that the coupling is not disassembled and remains locked together. Reverse dial instrumentation measures from both shaft center lines, rather than the coupling surface so the machining of the coupling during manufacture is not a major concern

  17. Equipment for extracting and conveying stratified minerals

    Energy Technology Data Exchange (ETDEWEB)

    Blumenthal, G.; Kunzer, H.; Plaga, K.

    1991-08-14

    This invention relates to equipment for extracting stratified minerals and conveying the said minerals along the working face, comprising a trough shaped conveyor run assembled from lengths, a troughed extraction run in lengths matching the lengths of conveyor troughing, which is linked to the top edge of the working face side of the conveyor troughing with freedom to swivel vertically, and a positively guided chain carrying extraction tools and scrapers along the conveyor and extraction runs.

  18. Equipment for liquid metal pressure measurement

    International Nuclear Information System (INIS)

    Jung, J.

    1977-01-01

    Equipment is proposed for measuring liquid metal pressure in piping or a tank. An auxiliary piping is connected to the piping or tank at the measuring point. The auxiliary piping transports liquid metal to a container by means of an electromagnetic pump. The piping also houses an electromagnetic flow ratemeter connected to an electric comparator. The comparator and the electromagnetic pump are connected to the pump output generator. (Z.M.)

  19. Testing of FFTF fuel handling equipment

    International Nuclear Information System (INIS)

    Coleman, D.W.; Grazzini, E.D.; Hill, L.F.

    1977-07-01

    The Fast Flux Test Facility has several manual/computer controlled fuel handling machines which are exposed to severe environments during plant operation but still must operate reliably when called upon for reactor refueling. The test programs for two such machines--the Closed Loop Ex-Vessel Machine and the In-Vessel Handling Machine--are described. The discussion centers on those areas where design corrections or equipment repairs substantiated the benefits of a test program prior to plant operation

  20. Special equipment support the fuel storage

    International Nuclear Information System (INIS)

    Vega, M. E.

    2014-01-01

    In the current juncture one of the keys to any company that works in a market that is as demanding as the nuclear, is its ability to developed new technological products that they can adapt to the different special situations/needs of nuclear Power Plants during their operating life. As an example, below are some of the specialized equipment that ENSA has been developing for more than thirty years that has been doing work in the area of fuel storage. (Author)

  1. An equipment complex for instrumental elementary analysis

    International Nuclear Information System (INIS)

    Borisov, G.I.; Komkov, M.M.; Kuz'michev, V.A.; Leonov, V.F.; Tarasov, Y.F.

    1986-01-01

    The competitiveness of elementary analysis on a research reactor depends, in many respects, on the provision of equipment which would permit the realization of the advantages of the analytical method. This paper describes the IR-8 reactor at the I.V. Kurchatov Institute of Atomic energy. In the design of the complex considerable attention was focused on automation and the radiation safety of the operations, which is of particular importance in the light of the large volumes of analysis

  2. Experimental equipment for an advanced ISOL facility

    International Nuclear Information System (INIS)

    Baktash, C.; Lee, I.Y.; Rehm, K.E.

    1999-01-01

    This report summarizes the proceedings and recommendations of the Workshop on the Experimental Equipment for an Advanced ISOL Facility which was held at Lawrence Berkeley National Laboratory on July 22--25, 1998. The purpose of this workshop was to discuss the performance requirements, manpower and cost estimates, as well as a schedule of the experimental equipment needed to fully exploit the new physics which can be studied at an advanced ISOL facility. An overview of the new physics opportunities that would be provided by such a facility has been presented in the White Paper that was issued following the Columbus Meeting. The reactions and experimental techniques discussed in the Columbus White Paper served as a guideline for the formulation of the detector needs at the Berkeley Workshop. As outlined a new ISOL facility with intense, high-quality beams of radioactive nuclei would provide exciting new research opportunities in the areas of: the nature of nucleonic matter; the origin of the elements; and tests of the Standard Model. After an introductory section, the following equipment is discussed: gamma-ray detectors; recoil separators; magnetic spectrographs; particle detectors; targets; and apparatus using non-accelerated beams

  3. Optimal Lease Contract for Remanufactured Equipment

    Science.gov (United States)

    Iskandar, B. P.; Wangsaputra, R.; Pasaribu, U. S.; Husniah, H.

    2018-03-01

    In the last two decades, the business of lease products (or equipment) has grown significantly, and many companies acquire equipment through leasing. In this paper, we propose a new lease contract under which a product (or equipment) is leased for a period of time with maximum usage per period (e.g. 1 year). This lease contract has only a time limit but no usage limit. If the total usage per period exceeds the maximum usage allowed in the contract, then the customer (as a lessee) will be charged an additional cost. In general, the lessor (OEM) provides a full coverage of maintenance, which includes PM and CM under the lease contract. It is considered that the lessor offers the lease contract for a remanufactured product. We presume that the price of the lease contract for the remanufactured product is much lower than that of a new one, and hence it would be a more attractive option to the customer. The decision problem for the lessee is to select the best option offered that fits to its requirement, and the decision problem for the lessor is find the optimal maintenance efforts for a given price of the lease option offered. We first find the optimal decisions independently for each party, and then the joint optimal decisions for both parties.

  4. TDRSS S-shuttle unique receiver equipment

    Science.gov (United States)

    Weinberg, A.; Schwartz, J. J.; Spearing, R.

    1985-01-01

    Beginning with STS-9, the Tracking and Date Relay Satellite system (TDRSS) will start providing S- and Ku-band communications and tracking support to the Space Shuttle and its payloads. The most significant element of this support takes place at the TDRSS White Sands Ground Terminal, which processes the Shuttle return link S- and Ku-band signals. While Ku-band hardware available to other TDRSS users is also applied to Ku-Shuttle, stringent S-Shuttle link margins have precluded the application of the standard TDRSS S-band processing equipment to S-Shuttle. It was therfore found necessary to develop a unique S-Shuttle Receiver that embodies state-of-the-art digital technology and processing techniques. This receiver, developed by Motorola, Inc., enhances link margins by 1.5 dB relative to the standard S-band equipment and its bit error rate performance is within a few tenths of a dB of theory. An overview description of the Space Shuttle Receiver Equipment (SSRE) is presented which includes the presentation of block diagrams and salient design features. Selected, measured performance results are also presented.

  5. An optimization tool for satellite equipment layout

    Science.gov (United States)

    Qin, Zheng; Liang, Yan-gang; Zhou, Jian-ping

    2018-01-01

    Selection of the satellite equipment layout with performance constraints is a complex task which can be viewed as a constrained multi-objective optimization and a multiple criteria decision making problem. The layout design of a satellite cabin involves the process of locating the required equipment in a limited space, thereby satisfying various behavioral constraints of the interior and exterior environments. The layout optimization of satellite cabin in this paper includes the C.G. offset, the moments of inertia and the space debris impact risk of the system, of which the impact risk index is developed to quantify the risk to a satellite cabin of coming into contact with space debris. In this paper an optimization tool for the integration of CAD software as well as the optimization algorithms is presented, which is developed to automatically find solutions for a three-dimensional layout of equipment in satellite. The effectiveness of the tool is also demonstrated by applying to the layout optimization of a satellite platform.

  6. Radioactive wastes assay technique and equipment

    International Nuclear Information System (INIS)

    Lee, K. M.; Hong, D. S; Kim, T. K.; Bae, S. M.; Shon, J. S.; Hong, K. P.

    2004-12-01

    The waste inventory records such as the activities and radio- nuclides contained in the waste packages are to be submitted with the radioactive wastes packages for the final disposal. The nearly around 10,000 drums of waste stocked in KAERI now should be assayed for the preparation of the waste inventory records too. For the successive execution of the waste assay, the investigation into the present waste assay techniques and equipment are to be taken first. Also the installation of the waste assay equipment through the comprehensive design, manufacturing and procurement should be proceeded timely. As the characteristics of the KAERI-stocked wastes are very different from that of the nuclear power plant and those have no regular waste streams, the application of the in-direct waste assay method using the scaling factors are not effective for the KAERI-generated wastes. Considering for the versal conveniency including the accuracy over the wide range of waste forms and the combination of assay time and sensitivity, the TGS(Tomographic Gamma Scanner) is appropriate as for the KAERI -generated radioactive waste assay equipment

  7. Project management in nuclear equipment manufacture

    International Nuclear Information System (INIS)

    Liu Jiancheng

    2005-01-01

    The completion of the management organization shall be firstly considered in project management for a nuclear power plant. The organization of nuclear equipment quality assurance program and project management consists of 5 departments such as the nuclear power container department, the manufacture department and the quality assurance department. The general manager takes the overall responsibility for the quality of the nuclear press usr bearing equipment, and the vice general manager takes responsibility for the quality, technology and schedule related with the manufacture of the equipment, and organizes the organization department for the audit. The director of the quality assurance department takes the responsibility for the establishment and completion of the quality assurance program, with enough rights authorized by the general manager, including the right not bounded by the cost and schedule, and confirms the implementation of the program by related departments and personnel. The manufacture schedule shall be prepared to ensure the implementation feasibility, process continuity and flexibility. The schedule shall be followed and monitored for the whole process, to check and feedback the implementation. (authors)

  8. Decontamination and Decommissioning Equipment Tracking System (DDETS)

    International Nuclear Information System (INIS)

    Cook, S.

    1994-07-01

    At the request of the Department of Energy (DOE)(EM-50), the Scientific Computing Unit developed a prototype system to track information and data relevant to equipment and tooling removed during decontamination and decommissioning activities. The DDETS proof-of-concept tracking system utilizes a one-dimensional (1D) and two-dimensional (2D) bar coding technology to retain and track information such as identification number, manufacturer, requisition information, and various contaminant information, etc. The information is encoded in a bar code, printed on a label and can be attached to corresponding equipment. The DDETS was developed using a proven relational database management system which allows the addition, modification, printing, and deletion of data. In addition, communication interfaces with bar code printers and bar code readers were developed. Additional features of the system include: (a) Four different reports available for the user (REAPS, transaction, and two inventory), (b) Remote automated inventory tracking capabilities, (c) Remote automated inventory tracking capability (2D bar codes allow equipment to be scanned/tracked without being linked to the DDETS database), (d) Edit, update, delete, and query capabilities, (e) On-line bar code label printing utility (data from 2D bar codes can be scanned directly into the data base simplifying data entry), and (f) Automated data backup utility. Compatibility with the Reportable Excess Automated Property System (REAPS) to upload data from DDETS is planned

  9. Retrieval of buried waste using conventional equipment

    International Nuclear Information System (INIS)

    Valentich, D.J.

    1994-01-01

    A field test was conducted to determine the effectiveness of using conventional type construction equipment for the retrieval of buried transuranic (TRU) waste. A cold (nonhazardous and nonradioactive test pit 841 m 3 in volume) was constructed with boxes and drums filled with simulated waste materials, such as metal, plastic, wood, concrete, and sludge. Large objects, including truck beds, vessels, vaults, pipes, and beams were also placed in the pit. These materials were intended to simulate the type of waste found in existing TRU buried waste pits and trenches. A series of commercially available equipment items, such as excavators and tracked loaders outfitted with different end effectors, were used to remove the simulated waste. Work was performed from both the abovegrade and belowgrade positions. During the demonstration, a number of observations, measurements, and analyses were performed to determine which equipment was the most effective in removing the waste. The retrieval rates for the various excavation techniques were recorded. The inherent dust control capabilities of the excavation methods used were also observed

  10. Beyond the glitz of new equipment

    International Nuclear Information System (INIS)

    Stolberg, H.O.; Nahmias, C.

    2001-01-01

    Canadian radiologists were informed by the press on Mar. 17, 2001, about an important initiative of their national organization. The CAR had commissioned a Montreal law firm to provide a legal opinion about the use of 'obsolete equipment'. The lawyer of the law firm opined that 'it is imperative that the patient be advised and understand the risks and uncertainties associated with the reliability of such an examination'. The 5-page legal opinion (available at www.car.ca) also recommended that radiologists inform patients that they should consider shopping around for a hospital or clinic with newer machines, even if it means travelling out of the country. When summarizing the legal advice for the media, the Chief Executive Officer of the CAR said radiologists should advise patients if better equipment is available in other facilities, including 'private facilities', or in other jurisdictions, such as the United States. These developments should be of great concern to Canadian radiologists who are well aware of the problems associated with aging equipment and the lack of and limited access to newer imaging modalities. The legal initiative of the CAR, however, makes it imperative for individual radiologists to provide comments and for the CAR executive to answer a number of questions and address a number of priorities, including the following. (author)

  11. Using operational equipment to read accident dosemeters.

    Science.gov (United States)

    Devine, R T; Vigil, M M; Martinez, W A

    2004-01-01

    Analysis of accident dosemeters usually involves the use of laboratory-based counting equipment. Gamma spectrometers are used for indium, copper and gold, and alpha-beta detectors for sulphur. This equipment is usually not easily transported due to the shielding required and the weight and delicacy of the counters. For intercomparison studies that require reading the dosemeters on site, a transportable system is required unless the site operating the study can count samples for all the participants. In the case of an actual accident these systems would have a difficulty in counting a large number of accident dosemeters. In an accident, personnel are usually subdivided according to their level of exposure. Those exposed to higher doses are treated immediately. An alternate system should be made available to handle the dosemeters worn by those personnel are likely to receive lower doses. Improvements in portable operational equipment for gamma and beta monitoring allow their use as spectrometers. Such a system was used for the SILENE intercomparison conducted at IRSN Valduc on 12 June and 19, 2002, and the preliminary results compared well with the other participants.

  12. Practical approaches to implementing facility wide equipment strengthening programs

    International Nuclear Information System (INIS)

    Kincaid, R.H.; Smietana, E.A.

    1989-01-01

    Equipment strengthening programs typically focus on components required to ensure operability of safety related equipment or to prevent the release of toxic substances. Survival of non-safety related equipment may also be crucial to ensure rapid recovery and minimize business interruption losses. Implementing a strengthening program for non-safety related equipment can be difficult due to the large amounts of equipment involved and limited budget availability. EQE has successfully implemented comprehensive equipment strengthening programs for a number of California corporations. Many of the lessons learned from these projects are applicable to DOE facilities. These include techniques for prioritizing equipment and three general methodologies for anchoring equipment. Pros and cons of each anchorage approach are presented along with typical equipment strengthening costs

  13. An on-line monitoring system for navigation equipment

    Science.gov (United States)

    Wang, Bo; Yang, Ping; Liu, Jing; Yang, Zhengbo; Liang, Fei

    2017-10-01

    Civil air navigation equipment is the most important infrastructure of Civil Aviation, which is closely related to flight safety. In addition to regular flight inspection, navigation equipment's patrol measuring, maintenance measuring, running measuring under special weather conditions are the important means of ensuring aviation flight safety. According to the safety maintenance requirements of Civil Aviation Air Traffic Control navigation equipment, this paper developed one on-line monitoring system with independent intellectual property rights for navigation equipment, the system breakthroughs the key technologies of measuring navigation equipment on-line including Instrument Landing System (ILS) and VHF Omni-directional Range (VOR), which also meets the requirements of navigation equipment ground measurement set by the ICAO DOC 8071, it provides technical means of the ground on-line measurement for navigation equipment, improves the safety of navigation equipment operation, and reduces the impact of measuring navigation equipment on airport operation.

  14. Chemical decontamination solutions: Effects on PWR equipment

    International Nuclear Information System (INIS)

    Pezze, C.M.; Colvin, E.R.; Aspden, R.G.

    1992-01-01

    A critical objective for the nuclear industry is the reduction of personnel exposure to radiation. Reductions have been achieved through industry's radiation management programs including training and radiation awareness concepts. Increased plant maintenance and higher radiation fields at many sites continue to raise concerns. To alleviate the radiation exposure problem, the sources of radiation which contribute to personnel exposure must be removed from the plant. A feasible was of significantly reducing these sources from a Pressurized Water Reactor (PWR) is to chemically decontaminate the entire reactor coolant system (RCS). A program was conducted to determine the technical acceptability of using certain dilute chemical solvent processes for full RCS chemical decontamination. The two processes evaluated were CAN-DEREM and LOMI. The purpose of the program was to define and complete a systematic evaluation of the major issues that need to be addressed for the successful decontamination of the entire RCS and affected portions of the auxiliary systems of a four-loop PWR system. A test program was designed to evaluate the corrosion effects of the two decontamination processes under expected plant conditions. Materials and sample configurations dictated by generic PWR components were evaluated. The testing also included many standard corrosion coupons. The test data were then used to assess the impact of chemical decontamination on the physical condition and operability of the components, equipment and mechanical systems that make up the RCS. An overview of the test program, sample configurations, data and engineering evaluations is presented. The data demonstrate that through detailed engineering evaluations of corrosion data and equipment function, the impact of full RCS chemical decontamination on plant equipment is established

  15. Response of equipment to aircraft impact

    International Nuclear Information System (INIS)

    Wolf, J.P.; Bucher, K.M.; Skrikerud, P.E.

    1977-01-01

    The loading case of an aircraft crashing onto certain safety-relevant buildings of a nuclear-power plant has recently become, in certain countries, as important as that of the safe-shutdown earthquake. Although its probability of occurrence is substantially smaller than that of the SSE, the analysis is justified as an aircraft can also be regarded as representative of other shock loading cases. For the purpose of design it is convenient to distinguish between the response of the actual structure and that of the equipment. The former, which consists of global stress resultants and of local effects such as spalling, scabbing, penetration and perforation of the concrete of the structure, is quite well understood and is not examined in this paper. The latter, caused by propagating shock waves, has, rather surprisingly, received little attention, although, for earthquake excitation, the analysis of equipment is routinely performed. The high accelerations experienced by the equipment are calculated and the corresponding floor-response spectra show that the airplane crash is dominant in the high-frequency range, when compared to the effect of earthquakes. As the aircraft impacts on a small area of the structure only, and the corresponding function of the load versus time exhibits a substantial content of high frequency, the modelling of the structure has to be rather detailed. Several thousand dynamic degrees of freedom in a finite-element idealization result, when analyzing e.g. a typical reactor auxiliary building, the familiar lumped-beam models used successfully for earthquake analysis can obviously not be chosen. (Auth.)

  16. Video equipment of tele dosimetry and audio

    International Nuclear Information System (INIS)

    Ojeda R, M.A.; Padilla C, I.

    2007-01-01

    To develop a work in an area with high radiation, it requires of a detailed knowledge of the surroundings work, a communication and effective vision, a near dosimetric control. In a work where the spaces variables and reduced accesses exist, noise that hinders the communication, defendant operative condition, radiation field and taking of decision, it is necessary to have tools that allow a total control of the environment to make opportune and effective decisions, there where the task is developed. Under this elementary concept, it was developed in the Laguna Verde Central a project that it allowed a mechanism, interactive of control in spaces complex; to see, to hear, to speak, to measure. This concept takes to the creation of an equipped system with closed circuit of television, wireless communication systems, tele dosimetry wireless systems, VHS and DVD recording equipment, uninterrupted energy units. The system requires of an electric power socket, and the installation of two cables by CCTV camera. The system is mobilized by a person. He puts on in operation in 5 minutes using a verification list. The concept was developed in the project denominated VETA-1, (Video Equipment of Tele dosimetry and Audio). It is objective of this work to present before the society the development of the VETA-1 tool that conclude in their first prototype in May of the present year. The VETA-1 project arises by a necessity of optimizing dose, it is an ALARA tool, with a countless applications, like it was proven in the 12 recharge stop of the Unit 1. The VETA-1 project integrate a recording system, with the primary end of analyzing in the place where the task is developed the details for an effective and opportune decision, but the resulting information is of utility for the personnel's training and the planning of future works. The VETA-1 system is an ALARA tool of quick response control. (Author)

  17. LDRD report: Smoke effects on electrical equipment

    International Nuclear Information System (INIS)

    TANAKA, TINA J.; BAYNES, EDWARD E. JR.; NOWLEN, STEVEN P.; BROCKMANN, JOHN E.; GRITZO, LOUIS A.; SHADDIX, Christopher R.

    2000-01-01

    Smoke is known to cause electrical equipment failure, but the likelihood of immediate failure during a fire is unknown. Traditional failure assessment techniques measure the density of ionic contaminants deposited on surfaces to determine the need for cleaning or replacement of electronic equipment exposed to smoke. Such techniques focus on long-term effects, such as corrosion, but do not address the immediate effects of the fire. This document reports the results of tests on the immediate effects of smoke on electronic equipment. Various circuits and components were exposed to smoke from different fields in a static smoke exposure chamber and were monitored throughout the exposure. Electrically, the loss of insulation resistance was the most important change caused by smoke. For direct current circuits, soot collected on high-voltage surfaces sometimes formed semi-conductive soot bridges that shorted the circuit. For high voltage alternating current circuits, the smoke also tended to increase the likelihood of arcing, but did not accumulate on the surfaces. Static random access memory chips failed for high levels of smoke, but hard disk drives did not. High humidity increased the conductive properties of the smoke. The conductivity does not increase linearly with smoke density as first proposed; however, it does increase with quantity. The data can be used to give a rough estimate of the amount of smoke that will cause failures in CMOS memory chips, dc and ac circuits. Comparisons of this data to other fire tests can be made through the optical and mass density measurements of the smoke

  18. Equipment design guidance document for flammable gas waste storage tank new equipment

    International Nuclear Information System (INIS)

    Smet, D.B.

    1996-01-01

    This document is intended to be used as guidance for design engineers who are involved in design of new equipment slated for use in Flammable Gas Waste Storage Tanks. The purpose of this document is to provide design guidance for all new equipment intended for application into those Hanford storage tanks in which flammable gas controls are required to be addressed as part of the equipment design. These design criteria are to be used as guidance. The design of each specific piece of new equipment shall be required, as a minimum to be reviewed by qualified Unreviewed Safety Question evaluators as an integral part of the final design approval. Further Safety Assessment may be also needed. This guidance is intended to be used in conjunction with the Operating Specifications Documents (OSDs) established for defining work controls in the waste storage tanks. The criteria set forth should be reviewed for applicability if the equipment will be required to operate in locations containing unacceptable concentrations of flammable gas

  19. Authorisation for work with electrical equipment

    CERN Multimedia

    Balle, Christoph

    2013-01-01

    The evaluation of training needs must be conducted by the Group Leader for every employee who could potentially be exposed to an electrical hazard. An analysis must be performed taking into account: • the voltage range (TBT, BT, HTA, HTB) • the type of work to be done (for example, work on a low-voltage line) • the type and the characteristics of the structures, installations and equipment • the type of current (alternating or direct) • the person’s ability to perform the operation

  20. Equipment Selection by using Fuzzy TOPSIS Method

    Science.gov (United States)

    Yavuz, Mahmut

    2016-10-01

    In this study, Fuzzy TOPSIS method was performed for the selection of open pit truck and the optimal solution of the problem was investigated. Data from Turkish Coal Enterprises was used in the application of the method. This paper explains the Fuzzy TOPSIS approaches with group decision-making application in an open pit coal mine in Turkey. An algorithm of the multi-person multi-criteria decision making with fuzzy set approach was applied an equipment selection problem. It was found that Fuzzy TOPSIS with a group decision making is a method that may help decision-makers in solving different decision-making problems in mining.

  1. Improving the hygienic design of closed equipment

    DEFF Research Database (Denmark)

    Friis, Alan; Jensen, Bo Boye Busk

    2005-01-01

    Maintenance of proper hygiene in closed process equipment is in many ways a complex task. The interaction between the physical design and the nature of fluid flow is of main concern. During cleaning the main performance of the flow is to bring cleaning agents in the right doses to all parts of th...... computational fluid dynamics models to be able to predict the cleaning efficiency in especially complex parts of process plants has excellent potentials for desktop improvements and computer pre-validation of the hygienic performance of process plants....

  2. High pressure freon decontamination of remote equipment

    International Nuclear Information System (INIS)

    Wilson, C.E.

    1987-01-01

    A series of decontamination tests using high pressure FREON 113 was conducted in the 200 Area of the Hanford site. The intent of these tests was to evaluate the effectiveness of FREON 113 in decontamination of manipulator components, tools, and equipment items contaminated with mixed fission products. The test results indicated that high pressure FREON 113 is very effective in removing fissile material from a variety of objects and can reduce both the quantity and the volume of the radioactive waste material presently being buried

  3. Electric Ground Support Equipment at Airports

    Energy Technology Data Exchange (ETDEWEB)

    2017-12-12

    Airport ground support equipment (GSE) is used to service airplanes between flights. Services include refueling, towing airplanes or luggage/freight carts, loading luggage/freight, transporting passengers, loading potable water, removing sewage, loading food, de-icing airplanes, and fire-fighting. Deploying new GSE technologies is a promising opportunity in part because the purchasers are generally large, technologically sophisticated airlines, contractors, or airports with centralized procurement and maintenance departments. Airlines could particularly benefit from fuel diversification since they are highly exposed to petroleum price volatility. GSE can be particularly well-suited for electrification because it benefits from low-end torque and has frequent idle time and short required ranges.

  4. Laboratory Equipment Type Fiber Optic Refractometer

    Directory of Open Access Journals (Sweden)

    E. F. Carome

    2002-09-01

    Full Text Available Using fiber optics and micro optics technologies we designed aninnovative fiber optic index of refraction transducer that has uniqueproperties. On the base of this transducer a laboratory equipment typefiber optic refractometer was developed for liquid index of refractionmeasurements. Such refractometer may be used for medical,pharmaceutical, industrial fluid, petrochemical, plastic, food, andbeverage industry applications. For example, it may be used formeasuring the concentrations of aqueous solutions: as the concentrationor density of a solute increase, the refractive index increasesproportionately. The paper describes development work related to designof laboratory type fiber optic refractometer and describes experimentsto evaluation of its basic properties.

  5. Alberta petroleum equipment and services directory, 1992

    International Nuclear Information System (INIS)

    1992-01-01

    A directory is presented of Alberta companies that provide equipment and services to the oil industry. In the main section, companies are listed alphabetically by name, along with their addresses, phone/fax numbers, contact personnel, and lists of products and/or services. A separate alphabetical name index and a product/service index are included. A section covering provincial and territorial government agencies and non-governmental associations and institutes is appended, giving name, address, phone/fax number, leading personnel, and a summary of activities

  6. Defects in medical X-ray equipment

    International Nuclear Information System (INIS)

    Eder, H.; Wahl, H.; Troeger, W.

    1979-01-01

    A careful estimate of the effects on the genetically significant radiation load shows that it is in the same order of magnitude as the increase in the skin dose area product. This is to say that of the genetically significant radiation dose of about 500 mJ/kg (50 mrem) per year and person due to medical X-ray diagnostics, about 75 mJ/kg (7.5 mrem) are due to serious defects in X-ray equipment. (orig.) [de

  7. Safety management of software-based equipment

    CERN Document Server

    Boulanger, Jean-Louis

    2013-01-01

    A review of the principles of the safety of software-based equipment, this book begins by presenting the definition principles of safety objectives. It then moves on to show how it is possible to define a safety architecture (including redundancy, diversification, error-detection techniques) on the basis of safety objectives and how to identify objectives related to software programs. From software objectives, the authors present the different safety techniques (fault detection, redundancy and quality control). "Certifiable system" aspects are taken into account throughout the book. C

  8. The replacement of technically obsolete equipments

    International Nuclear Information System (INIS)

    Anglaret, Ph.; Patouillaud, M.

    1987-01-01

    The paper covers the analysis of procedures for replacement of technically obsolete but still operational equipments in use in a nuclear power plant. The Three Mile Island accident showed that operators in the control room reqire additional information at their disposal. In 1986 CGEE Alsthom received two orders for improvements to control systems, for the South African nuclear power plant Koeberg and the Dutch nuclear power plant Borssele. The new systems will provide support to normal operation and offer additional help in accident situations. 4 figs

  9. Accidental exposition with xray diffraction equipment

    International Nuclear Information System (INIS)

    Montanez, O.; Blanco, D.

    1991-01-01

    The plug fault Xray diffraction equipment promoted searcher irradiation.The film dosemeter who he carried was over exposed (D.O.>4.5). The reconstruction of the accident for value the operator dose received and future effects of him. The troubled received the following dose: 350-700 rad in 1 to 2 minutes in thorax and probably face level,this one measured with X ray chamber as low energy. The involved tissue were: skin, thyroids and crystalline of the eye. As conclusion a partial dose received for the worker had not threshold value for produce deterministic effects

  10. Safeguards techniques and equipment. 2003 ed

    International Nuclear Information System (INIS)

    2003-01-01

    The 1990s saw significant non-proliferation related developments in the world, resulting in a new period of safeguards development. Over several years an assessment was made of how to strengthen the effectiveness and improve the efficiency of IAEA safeguards. In May 1997 this culminated in the adoption by the IAEA Board of Governors of a Protocol Additional to Safeguards Agreements which significantly broadens the role of IAEA safeguards. As a consequence, the IAEA safeguards system entered a new era. In 1997 the IAEA began to publish a new series of booklets on safeguards, called the International Nuclear Verification Series (NVS). The objective of these booklets was to help in explaining IAEA safeguards, especially the new developments in safeguards, particularly for facility operators and government officers involved with these topics. The current booklet, which is a revision and update of IAEA/NVS/1, is intended to give a full and balanced description of the techniques and equipment used for both nuclear material accountancy and containment and surveillance measures, and for the new safeguards measure of environmental sampling. A completely new section on data security has been added to describe the specific features that are included in installed equipment systems in order to ensure the authenticity and confidentiality of information. As new verification measures continue to be developed the material in this booklet will be periodically reviewed and updated versions issued. The basic verification measure used by the IAEA is nuclear material accountancy. In applying nuclear material accountancy, IAEA safeguards inspectors make independent measurements to verify quantitatively the amount of nuclear material presented in the State's accounts. For this purpose, inspectors count items (e.g. fuel assemblies, bundles or rods, or containers of powdered compounds of uranium or plutonium) and measure attributes of these items during their inspections using non

  11. Process insulation. Isolation thermique des equipements

    Energy Technology Data Exchange (ETDEWEB)

    1987-01-01

    A manual is presented to assist managers and operating personnel to recognize industrial energy management opportunities, and provides mathematical equations, general information on proven techniques and technology, and examples. It deals with process insulation, focusing on the insulation of mechanical systems such as piping, process vessels, equipment, and ductwork. The manual describes the effects of insulation materials; commonly encountered types of insulation, coverings and protective finishes as well as common applications; energy management opportunities, divided into housekeeping, low cost, and retrofit; and includes worked examples of each. Includes glossary. 17 figs., 8 tabs.

  12. Tertiary recovery and tritide injection equipment

    International Nuclear Information System (INIS)

    Li Lin

    1989-01-01

    The exploitation of an oil field is a continously developing process, undergoing seveal stages, such as the low production, the high production, the stable production and the decline. The tertiary recovery is an important means of the enhanced oil recovery. Since the object of the tertiary recovery is to treat the oil in micropores which is difficult to be produced, it is more necessary to know further the reservoir. Tritide can be used as a tracer and is an ideal marker of knowing the reservoir and the state of the fluid movement. The paper presents the tritide injection equipment

  13. Functional integration of digital radiologic equipment

    International Nuclear Information System (INIS)

    Agnifili, A.; DiStefano, G.; Salcito, G.; Passariello, R.

    1989-01-01

    This paper reports on a pilot project for the functional integration of digital radiologic equipment. Four different systems (a digital subtraction angiography unit, a DF unit, a computer radiography prototype, and a film digitizer) were connected with a link in an Ethernet LAN.ACR-NEMA standards were used to process the images of the different units in the same way. The central computer manages the long-term optical archive and the film laser printer. Some graphic workstations are connected to the picture archiving and communications system, which allows fast retrieval and processing of the images. Patients; data are acquired through the RIS and stored together with the images

  14. Usability analysis of industrial cooking equipment.

    Science.gov (United States)

    Calado, Alexana Vilar Soares; Soares, Marcelo Márcio

    2012-01-01

    This paper refers to the comparative study of the equipment used for cooking in commercial of kitchens restaurants that use the system of traditional cooking and those ones which use the system called smart cooking (combination oven). The study investigates the usability issues concerning to the two systems, analyzing comparatively the aspects related to anthropometry, dimensional variables, the use of the product and also the product safety, as well as issues of information related to operation of the new concepts of cooking in intelligent systems.

  15. Hydrogen and Fuel Cells for IT Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Kurtz, Jennifer

    2016-03-09

    With the increased push for carbon-free and sustainable data centers, data center operators are increasingly looking to renewable energy as a means to approach carbon-free status and be more sustainable. The National Renewable Energy Laboratory (NREL) is a world leader in hydrogen research and already has an elaborate hydrogen infrastructure in place at the Golden, Colorado, state-of-the-art data center and facility. This presentation will discuss hydrogen generation, storage considerations, and safety issues as they relate to hydrogen delivery to fuel cells powering IT equipment.

  16. Nuclear electronic equipment for control and monitoring boards. Susceptibility of nuclear electronic pulse equipment to interference

    International Nuclear Information System (INIS)

    Buisson, Jacques; Cochinal, R.; Duquesnoy, J.; Roquefort, H.

    1972-07-01

    The correct functioning of pulse measurement units in industrial environmental conditions where interference is high, frequently gives rise to many installation problems which are difficult to solve. This paper offers some recommendations with a view to minimising the effect to electric interference on electronic equipment and gives a test method which enables this effect to be assessed qualitatively. It has been devised for nuclear electronic instrumentation but it may also be applied to other equipment and in particular the test method may be used for other cases. After a few preliminaries on how interference acts and on the terminology, the design of the equipment and the recommended connections are mentioned. Test methods are then indicated, followed by various technical comments. (author) [fr

  17. Method and equipment for treating waste water resulting from the technological testing processes of NPP equipment

    International Nuclear Information System (INIS)

    Radulescu, M. C.; Valeca, S.; Iorga, C.

    2016-01-01

    Modern methods and technologies coupled together with advanced equipment for treating residual substances resulted from technological processes are mandatory measures for all industrial facilities. The correct management of the used working agents and of the all wastes resulted from the different technological process (preparation, use, collection, neutralization, discharge) is intended to reduce up to removal of their potential negative impact on the environment. The high pressure and temperature testing stands from INR intended for functional testing of nuclear components (fuel bundles, fuelling machines, etc.) were included in these measures since the use of oils, demineralized water chemically treated, greases, etc. This paper is focused on the method and equipment used at INR Pitesti in the chemical treatment of demineralized waters, as well as the equipment for collecting, neutralizing and discharging them after use. (authors)

  18. The market for nuclear equipment - engineering and fabrication

    International Nuclear Information System (INIS)

    Tait, D.R.

    1977-01-01

    The role of electronic equipment in a CANDU power station is explained. Costs of installations and outages are outlined. The nuclear market for electronic equipment utilizes many components common to non-nuclear applications. (E.C.B.)

  19. Year 2000 compliance status report for core sampling equipment

    International Nuclear Information System (INIS)

    BOGER, R.M.

    1999-01-01

    Several pieces of equipment that support core sampling activities are ''date aware'' and could be affected by the roll over to the year 2000. This report documents the testing and remedial efforts for this equipment

  20. Equipment acquisition plans for the SSCL magnet excitation power system

    International Nuclear Information System (INIS)

    Winje, R.

    1993-05-01

    This report gives a brief description of the major electrical technical equipment used in the Superconducting Super Collider accelerators systems and the present laboratory plans for the acquisition of the equipment

  1. 41 CFR 101-25.109-2 - Equipment pools.

    Science.gov (United States)

    2010-07-01

    ... number and location of equipment pools, consideration shall be given to economy of operation, mobility of... available for sharing or loan. Information concerning the availability of this equipment can be maintained...

  2. 49 CFR 390.17 - Additional equipment and accessories.

    Science.gov (United States)

    2010-10-01

    ... equipment and accessories, not inconsistent with or prohibited by this subchapter, provided such equipment... are used. [53 FR 18052, May 19, 1988, as amended at 60 FR 38744, July 28, 1995. Redesignated at 65 FR...

  3. 21 CFR 866.4830 - Rocket immunoelectro-phoresis equipment.

    Science.gov (United States)

    2010-04-01

    ... (CONTINUED) MEDICAL DEVICES IMMUNOLOGY AND MICROBIOLOGY DEVICES Immunology Laboratory Equipment and Reagents... equipment for clinical use is a device used to perform a specific test on proteins by using a procedure...

  4. Case Based Asset Maintenance for the Electric Equipment

    International Nuclear Information System (INIS)

    Kim, Ji-Hyeon; Jung, Jae-Cheon; Chang, Young-Woo; Chang, Hoon-Seon; Kim, Jae-Cheol; Kim, Hang-Bae; Kim, Kyu-Ho; Hur, Yong; Lee, Dong-Chul

    2006-01-01

    The electric equipment maintenance strategies are changing from PM(Preventive Maintenance) or CM(Corrective Maintenance) to CBM(Condition Based Maintenance). The main benefits of CBM are reduced possibility of service failures of critical equipment and reduced costs or maintenance work. In CBM, the equipment status need to be monitored continuously and a decision should be made whether an equipment need to be repaired or replaced. For the maintenance decision making, the CBR(Case Base Reasoning) system is introduced. The CBR system receives the current equipment status and retrieves the case based historic database to determine any possible equipment failure under current conditions. In retrieving the case based historic data, the suggested DSS(Decision Support System) uses a reasoning engine with an equipment/asset ontology that describes the equipment subsumption relationships

  5. Laser-based measuring equipment controlled by microcomputer

    International Nuclear Information System (INIS)

    Miron, N.; Sporea, D.; Velculescu, V.G.; Petre, M.

    1988-03-01

    Some laser-based measuring equipment controlled by microcomputer developed for industrial and scientific purposes are described. These equipments are intended for dial indicators verification, graduated rules measurement, and for very accurate measurement of the gravitational constant. (authors)

  6. Plant-wide integrated equipment monitoring and analysis system

    International Nuclear Information System (INIS)

    Morimoto, C.N.; Hunter, T.A.; Chiang, S.C.

    2004-01-01

    A nuclear power plant equipment monitoring system monitors plant equipment and reports deteriorating equipment conditions. The more advanced equipment monitoring systems can also provide information for understanding the symptoms and diagnosing the root cause of a problem. Maximizing the equipment availability and minimizing or eliminating consequential damages are the ultimate goals of equipment monitoring systems. GE Integrated Equipment Monitoring System (GEIEMS) is designed as an integrated intelligent monitoring and analysis system for plant-wide application for BWR plants. This approach reduces system maintenance efforts and equipment monitoring costs and provides information for integrated planning. This paper describes GEIEMS and how the current system is being upgraded to meet General Electric's vision for plant-wide decision support. (author)

  7. Future development of IR thermovision weather satellite equipment

    Science.gov (United States)

    Listratov, A. V.

    1974-01-01

    The self radiation of the surface being viewed is used for image synthesis in IR thermovision equipment. The installation of such equipment aboard weather satellites makes it possible to obtain cloud cover pictures of the earth's surface in a complete orbit, regardless of the illumination conditions, and also provides quantitative information on the underlying surface temperature and cloud top height. Such equipment is used successfully aboard the Soviet satellites of the Meteor system, and experimentally on the American satellites of the Nimbus series. With regard to surface resolution, the present-day IR weather satellite equipment is inferior to the television equipment. This is due primarily to the comparatively low detectivity of the IR detectors used. While IR equipment has several fundamental advantages in comparison with the conventional television equipment, the problem arises of determining the possibility for future development of weather satellite IR thermovision equipment. Criteria are examined for evaluating the quality of IR.

  8. Implications of NUREG-1150 for equipment qualification

    International Nuclear Information System (INIS)

    Siu, R.P.; Sarram, M.

    1988-01-01

    Current USNRC regulations in 10CFR50 requires that structures, systems and components important to safety in a nuclear power plant are to be designed to accommodate the effects of harsh environments associated with potential accidents. Detailed regulatory requirements are as discussed in Regulatory Guide 1.89. Some of these regulatory requirements have been based upon rather outdated understanding of the phenomenology of severe accidents -- e.g., the radiation source terms for equipment qualification can be traced to TID-14844 which was originally published in 1962. Furthermore, the definition of important-to-safety in these regulatory requirements is rather broad, usually resulting in a long Q-list of equipment to be qualified for the design-basis Large LOCA. In the past few years, extensive research/analysis on severe accidents have been conducted -- from the IREP/NREP activities, the IDCOR programs, to the NUREG-1150 efforts. This paper reports that as a result of all these PRA-related activities, a much-improved understanding of the phenomenology and environmental conditions associated with severe accidents has been gained

  9. BIODIESEL BLENDS IN SPACE HEATING EQUIPMENT

    International Nuclear Information System (INIS)

    KRISHNA, C.R.

    2001-01-01

    Biodiesel is a diesel-like fuel that is derived from processing vegetable oils from various sources, such as soy oil, rapeseed or canola oil, and also waste vegetable oils resulting from cooking use. Brookhaven National laboratory initiated an evaluation of the performance of blends of biodiesel and home heating oil in space heating applications under the sponsorship of the Department of Energy (DOE) through the National Renewable Energy Laboratory (NREL). This report is a result of this work performed in the laboratory. A number of blends of varying amounts of a biodiesel in home heating fuel were tested in both a residential heating system and a commercial size boiler. The results demonstrate that blends of biodiesel and heating oil can be used with few or no modifications to the equipment or operating practices in space heating. The results also showed that there were environmental benefits from the biodiesel addition in terms of reductions in smoke and in Nitrogen Oxides (NOx). The latter result was particularly surprising and of course welcome, in view of the previous results in diesel engines where no changes had been seen. Residential size combustion equipment is presently not subject to NOx regulation. If reductions in NOx similar to those observed here hold up in larger size (commercial and industrial) boilers, a significant increase in the use of biodiesel-like fuel blends could become possible

  10. Biofilms associated with poultry processing equipment.

    Science.gov (United States)

    Lindsay, D; Geornaras, I; von Holy, A

    1996-01-01

    Aerobic and Gram-negative bacteria were enumerated on non-metallic surfaces and stainless steel test pieces attached to equipment surfaces by swabbing and a mechanical dislodging procedure, respectively, in a South African grade B poultry processing plant. Changes in bacterial numbers were also monitored over time on metal test pieces. The highest bacterial counts were obtained from non-metallic surfaces such as rubber fingered pluckers and plastic defeathering curtains which exceeded the highest counts found on the metal surfaces by at least 1 log CFU cm-2. Gram-negative bacterial counts on all non-metallic surface types were at least 2 log CFU cm-2 lower than corresponding aerobic plate counts. On metal surfaces, the highest microbial numbers were obtained after 14 days exposure, with aerobic plate counts ranging from 3.57 log CFU cm-2 to 5.13 log CFU cm-2, and Gram-negative counts from 0.70 log CFU cm-2 to 3.31 log CFU cm-2. Scanning electron microscopy confirmed the presence of bacterial cells on non-metallic and metallic surfaces associated with poultry processing. Rubber 'fingers', plastic curtains, conveyor belt material and stainless steel test surfaces placed on the scald tank overflow and several chutes revealed extensive and often confluent bacterial biofilms. Extracellular polymeric substances, but few bacterial cells were visible on test pieces placed on evisceration equipment, spinchiller blades and the spinchiller outlet.

  11. Radiation protection problems with dental radiological equipment

    International Nuclear Information System (INIS)

    Cooney, P.; Rajan, J.; Malone, J.F.; Gavin, G.

    1995-01-01

    With the advent of the EC Patient Directive, the importance of surveying and optimising patient exposure for diagnostic imaging procedures is paramount. In the field of dentistry there has been a heightened interest in areas of equipment performance and patient exposure. This interest, coupled with a number of dental radiation safety incidents investigated by our department, and the issuing of a Code of Practice for Radiological Protection in Dentistry by the Department of Health, led to the establishment in our department, of an evaluation protocol for the performance and operation of dental X ray equipment. The protocol was used to perform a survey on over 100 dental X ray units in use in the Public Sector in Ireland. This presentation will report on the radiation incidents mentioned above. It will detail the protocol and furnish the results and conclusions of the survey. The survey has made it possible to establish clearly the necessary steps required to ensure compliance with requirements. In addition, the corrective steps taken by the dental authorities will be presented and the overall impact of the regulations and the programme consequent on them will be reviewed. (Author)

  12. Bilateral tension pneumothorax following equipment improvisation.

    Science.gov (United States)

    Zambricki, Christine; Schmidt, Carol; Vos, Karen

    2014-02-01

    This case report describes an unexpected event that took place as a result of using improvised equipment. The patient, a 16-year-old female undergoing complex oral surgery, suffered bilateral pneumothorax following the improper use of an airway support device. During the immediate postoperative period with the patient still intubated, oxygen tubing was attached to a right angle elbow connector with the port closed and 10 L/minute oxygen flow was administered to the patient in a manner that did not allow the patient to exhale. Within seconds, pneumothorax was apparent as the patient's vital signs deteriorated, visible swelling was noted in the shoulders and neck, and there was an absence of breath sounds on auscultation. This case study has application beyond the immediate discussion of bilateral pneumothorax, serving as a caution about the unintended consequences of equipment improvisation. In addition to highlighting the hazards of providing patient care with a non-standard device, this study also provides a powerful example of the human factors that can contribute to medical errors in the healthcare setting.

  13. Investigation equipment and methods used by Posiva

    International Nuclear Information System (INIS)

    Oehberg, A.

    2006-10-01

    Posiva Oy, a company jointly owned by TVO and Fortum, submitted an application for the Decision in Principle to the Finnish Government in May 1999. A positive decision was made at the end of 2000 by the Government. The Finnish Parliament ratified the Decision in Principle on the final disposal facility for spent nuclear fuel at Olkiluoto, Eurajoki in May 2001. The decision makes it possible for Posiva to focus the confirming bedrock investigations at Olkiluoto, where in the next few years an underground research facility, ONKALO, for rock characterisation for the final disposal of spent nuclear fuel will be constructed. The construction of the ONKALO access tunnel was started in September 2004. This report describes the investigation methods and equipment developed and used by Posiva Oy during the confirming site investigations from the surface. The report covers the areas of drilling of deep investigation holes, geophysical loggings, geophysical ground and tunnel surveys, hydrogeological and hydrogeochemical as well as rock mechanical methods. Emphasis is given on those equipment and methods developed by Posiva and those that have frequently and recently been used in the Posiva's characterisation programmes including methods applied during excavation of ONKALO access tunnel. The database used for the field investigation data is also briefly described in this report. (orig.)

  14. Auxiliary equipment cooling circuit in nuclear reactors

    International Nuclear Information System (INIS)

    Yanagisawa, Ko.

    1986-01-01

    Purpose: To prevent the propagation of bacterias that transform NO 2 into NO 3 in auxiliary equipment coolants using corrosion inhibitors of nitrite type in BWR type reactors. Method: In auxiliary equipments coolant systems, water quality is controlled by using purified water as supplement water and nitrite such as Na 2 NO 2 as the corrosion inhibitors. However, in the circumstance where dissolved oxygen is present, bacteria propagate to oxidize NO 2 into NO 3 . Thus, NO 2 at 200 ppm is reduced to 20 ppm. In view of the above, a surge tank supplied from water supplement line is connected in series and a deaeration device is disposed thereto. Since the presence of dissolved oxygen causes the bacteria to propagate it is desired that the dissolved oxygen density in the supplement water is less than 5 ppm. Deaeration and pressure reduction in the surge tank can remove the dissolved oxygen, prevent NO 3 increase and also prevent stress corrosion cracks in the system pipeways. (Horiuchi, T.)

  15. Sodium cleaning device for nuclear reactor equipments

    International Nuclear Information System (INIS)

    Fujisawa, Morio.

    1985-01-01

    Purpose: To enable sodium cleaning over the entire length of large size equipments such as control rod drives and primary coolant recycling pumps for use in FBR type reactors. Constitution: A plurality of warm water supply nozzles each having a valve are connected at varying height on the side of a cleaning tank, to which an exhaust line is connected. These nozzles are connected with an exhaust port at the bottom of the tank to constitute a pipeway for cleaning warm water recycling line including a water feed pump and a feedwater heater. The water level in the tank is changed stepwise by successively selecting the warm water feed nozzles. Further, the warm water in the tank is recyclically fed through the nozzles selected at each step of the water level through the recycle line while warming. On the other hand, the pressure inside the tank is reduced through the exhaust line, whereby the warm water in the tank is boiled at low temperature to clean-up sodium on the equipments to be cleaned over the entire length. (Horiuchi, T.)

  16. Radiation hardened equipment and material data base

    International Nuclear Information System (INIS)

    Sumita, Kenji; Yamaoka, Hitoshi; Kakuta, Tsunemi; Shono, Yoshihiko; Nakamura, Tetsuo; Nakase, Yoshiaki; Furuta, Junichiro.

    1988-01-01

    In order to collect and put in order the results regarding radiation-withstanding equipment and materials, the Osaka Nuclear Science Association organized the committee composed of the experts in various fields in fiscal year 1986 for the purpose of building up the data base, and began the activity. From the trend of the research and development and the usefulness for the future, the fields of collecting data were decided as organic materials, optical fibers, semiconductor elements and compound semiconductors. By fiscal year 1987, the building-up of the prototype data base was aimed at, and system configuration, the making of the formats on the items and attributes of collected data, the action test of the system and so on were carried out. Under the background of the upgrading of LWRs, the development of FBRs and nuclear fusion reactors, the construction of a reprocessing plant and a low level waste storage facility, and the progress of various advanced technologies, the research on the equipment and materials having excellent radiation resistance and the development for heightening the performance have been carried out in many places separately, accordingly the activity for building up the prototype data base was begun, and about 600 cases were collected. (Kako, I.)

  17. Criteria for approving equipment for continued operation

    International Nuclear Information System (INIS)

    Narayanan, T.V.

    1993-01-01

    In May 1988, the Pressure Vessel Research Committee (PVRC) of the Welding Research Council (WRC) initiated four projects in support of ASME's efforts to develop Codes and Standards for life prediction and life extension of nuclear and fossil power plant components. These projects are: (1) Criteria for Approving Equipment for Continued Operation (2) Guidelines and Procedures for Evaluating Piping for Continued Operation (3) Nondestructive Evaluation of Material Degradation (4) Operation and Maintenance History and Life Cycle Management. The PVRC awarded a contract to Foster Wheeler Development Corporation to undertake the first of these projects. The specific objective was to develop a program plan that will lead to development of ''Criteria for Approving Equipment for Continued Operation.'' The program is divided into the following four tasks: Task 1: Literature Search; Task 2: Telephone Interview and Consultation; Task 3: Program Plan Development; Task 4: Preparation of a Summary Report. This report is in fulfillment of the above project. As part of this study, the author reviewed about 145 reports, papers and books relating to various aspects of life extension. Various experts were also consulted who are involved in EPRI, NRC, ASME, PVRC, MPC, and utility studies as well as other research projects. The conclusions and recommendations for Code-related activities are summarized

  18. Welding technologies for nuclear machinery and equipment

    International Nuclear Information System (INIS)

    Kobayashi, Masahiro; Yokono, Tomomi.

    1991-01-01

    The main welding methods applied to nuclear machinery and equipment are shielded metal arc welding, submerged arc welding, MAG welding and TIG welding. But in the last 10 years, in order to improve the reliability required for the welding of nuclear machinery and equipment, the welding technologies aiming at the reduction of heat input, the decrease of the number of welding pass and the automatic control of welding factors have been applied for the main purpose of bettering the quality and excluding human errors. The merits and the technology of narrow gap, pulsed MAG welding and melt-through welding are explained. As the automation of TIG welding, image processing type narrow gap, hot wire TIG welding and remote control type automatic TIG welding are described. For the longitudinal welding of active metal sheet products, plasma key-hole welding is applied. Since the concentration of its arc is good, high speed welding with low heat input can be done. For the stainless steel cladding by welding, electroslag welding has become to be employed in place of conventional submerged arc welding. Arc is not generated in the electroslag welding, and the penetration into base metal is small. (K.I.)

  19. Days individual equipment of protection and professional risks

    International Nuclear Information System (INIS)

    2007-01-01

    The personal protection equipment is studied in the legal way (legal liabilities, certification, European texts), technical way (ergonomics, painfulness of ventilated equipment wearing, reliability of a respirable air line, protection gloves against the chemical risk, exposure to nano particulates, working in hot area), human factors (hostile area and emotion management), studies on personal equipment such evaluation, efficiency, conception of new equipment, physiological tolerance, limit of use, and some general safety studies on the working places. (N.C.)

  20. Research on the Reliability Testing of Electrical Automation Control Equipment

    OpenAIRE

    Yongjie Luo

    2014-01-01

    According to the author’s many years’ work experience, this paper first discusses the concepts of electrical automation control equipment reliability testing, and then analyzes the test method of electrical automation control equipment reliability testing, finally, on this basis, this article discusses how to determine the reliability test method of electrical automation control equipment. Results of this study will provide a useful reference for electrical automation control equipment reliab...

  1. Earthquake protection of essential civil and industrial equipments

    International Nuclear Information System (INIS)

    Bourrier, P.; Le Breton, F.; Thevenot, A.

    1986-01-01

    This document presents the principal reflexions concerning seismic engineering applications for equipment and the difference of the non-employment towards these structures. The notion of essential equipment is then pointed out as well as the main particularities of equipment considered as structures. Finally, this document illustrates a few pathological examples encountered after an earthquake, and presents some equipments of a nuclear power plant which to resist an increased safety seism [fr

  2. Diagnostic x-ray equipment and its use

    International Nuclear Information System (INIS)

    1993-01-01

    The guide contains the requirements for the use, structure and operation of diagnostic x-ray equipment necessary to ensure the radiation safety of workers and patients. The guide is intended for the party responsible for operating the x-ray units, the staff operating, installing and maintaining x-ray examination equipment, and companies manufacturing and selling such equipment. Special requirements for mammographic and dental x-ray equipments are given in separate ST guides. (5 refs., 1 figs., 2 tabs.)

  3. Medical equipment in government health facilities: Missed opportunities

    OpenAIRE

    Pardeshi Geeta

    2005-01-01

    BACKGROUND: The availability and optimal utilization of medical equipment is important for improving the quality of health services. Significant investments are made for the purchase, maintenance and repair of medical equipment. Inadequate management of these equipment will result in financial losses and deprive the public of the intended benefits. This analysis is based on the conceptual framework drawn from the WHO recommended- lifecycle of medical equipment. AIMS: (1) To identify the probl...

  4. Connected Equipment Maturity Model Version 1.0

    Energy Technology Data Exchange (ETDEWEB)

    Butzbaugh, Joshua B. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Mayhorn, Ebony T. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Sullivan, Greg [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Whalen, Scott A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2017-05-01

    The Connected Equipment Maturity Model (CEMM) evaluates the high-level functionality and characteristics that enable equipment to provide the four categories of energy-related services through communication with other entities (e.g., equipment, third parties, utilities, and users). The CEMM will help the U.S. Department of Energy, industry, energy efficiency organizations, and research institutions benchmark the current state of connected equipment and identify capabilities that may be attained to reach a more advanced, future state.

  5. 48 CFR 52.207-5 - Option To Purchase Equipment.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Option To Purchase....207-5 Option To Purchase Equipment. As prescribed in 7.404, insert a clause substantially the same as the following: Option To Purchase Equipment (FEB 1995) (a) The Government may purchase the equipment...

  6. 33 CFR 142.24 - Use of equipment.

    Science.gov (United States)

    2010-07-01

    ... CONTINENTAL SHELF ACTIVITIES WORKPLACE SAFETY AND HEALTH Personal Protective Equipment § 142.24 Use of equipment. (a) Each holder of a lease or permit issued under the Act shall ensure that all personnel who are required by this subpart to use or wear personal protective equipment do so when within the lease area or...

  7. 47 CFR 76.1621 - Equipment compatibility offer.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Equipment compatibility offer. 76.1621 Section... MULTICHANNEL VIDEO AND CABLE TELEVISION SERVICE Notices § 76.1621 Equipment compatibility offer. Cable system... offer to supply each subscriber with special equipment that will enable the simultaneous reception of...

  8. 48 CFR 870.115 - Food service equipment.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Food service equipment... DEPARTMENT SUPPLEMENTARY REGULATIONS SPECIAL PROCUREMENT CONTROLS Controls 870.115 Food service equipment. (a) All new food service equipment purchased for Dietetic Service through other than Defense General...

  9. 46 CFR 197.454 - First aid and treatment equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false First aid and treatment equipment. 197.454 Section 197.454 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE OCCUPATIONAL SAFETY AND... Equipment § 197.454 First aid and treatment equipment. The diving supervisor shall ensure that medical kits...

  10. 14 CFR 23.1441 - Oxygen equipment and supply.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Oxygen equipment and supply. 23.1441... Miscellaneous Equipment § 23.1441 Oxygen equipment and supply. (a) If certification with supplemental oxygen..., during the flight, the quantity of oxygen available in each source of supply. (d) Each required flight...

  11. 29 CFR 1910.306 - Specific purpose equipment and installations.

    Science.gov (United States)

    2010-07-01

    ...) Cranes and hoists. This paragraph applies to the installation of electric equipment and wiring used in..., and similar events. This paragraph covers the installation of portable wiring and equipment, including... 29 Labor 5 2010-07-01 2010-07-01 false Specific purpose equipment and installations. 1910.306...

  12. 46 CFR 71.25-25 - Hull equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 3 2010-10-01 2010-10-01 false Hull equipment. 71.25-25 Section 71.25-25 Shipping COAST... Inspection § 71.25-25 Hull equipment. (a) At each annual inspection, the inspector shall conduct the following tests and inspections of hull equipment: (1) All subdivision bulkheads shall be examined to...

  13. Inventory of Tank Farm equipment stored or abandoned aboveground

    International Nuclear Information System (INIS)

    Hines, S.C.; Lakes, M.E.

    1994-01-01

    This document provides an inventory of Tank Farm equipment stored or abandoned aboveground and potentially subject to regulation. This inventory was conducted in part to ensure that Westinghouse Hanford Company (WHC) does not violate dangerous waste laws concerning storage of potentially contaminated equipment/debris that has been in contact with dangerous waste. The report identifies areas inventoried and provides photographs of equipment

  14. 33 CFR 106.255 - Security systems and equipment maintenance.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Security systems and equipment... Shelf (OCS) Facility Security Requirements § 106.255 Security systems and equipment maintenance. (a) Security systems and equipment must be in good working order and inspected, tested, calibrated, and...

  15. Anesthetic equipment, facilities and services available for pediatric ...

    African Journals Online (AJOL)

    2011-04-09

    Apr 9, 2011 ... standards and increased use of disposable anesthetic equipment. An audit of equipment and facilities for anesthetic care in pediatric patients is important and should be carried out periodically to appraise the situation for upgrading of essential anesthetic facilities and equipment. Appendix A. 18th March, ...

  16. Application of the small trackless equipments in Benxi uranium mine

    International Nuclear Information System (INIS)

    Lei Zeyong; Liu Shengzheng

    2004-01-01

    The application of the small trackless equipments in Benxi uranium mine is introduced in this paper. The running data of these equipments are tested and discussed. It is proved that these equipments can run normally and meet the needs of uranium mining. Some experimental data will be very useful for building small mines and rebuilding small mines in China

  17. DWPF liquid sample station: Status of equipment development

    International Nuclear Information System (INIS)

    Caplan, J.R.

    1987-01-01

    This report summarizes operating experience and equipment status of the DWPF liquid sample cell. Operation hours to date, results of equipment inspections and problems encountered and their solutions are discussed. An equipment and instrumentation status updating DPST-85-592, DWPF LIQUID SAMPLE CELL MOCK-UP, is presented. Remaining development items are also outlined

  18. Process and equipment design optimising product properties and attributes

    NARCIS (Netherlands)

    Bongers, P.M.M.; Thullie, J.

    2009-01-01

    Classically, when products have been developed at the bench, process engineers will search for equipment to manufacture the product at large scale. More than often, this search is constraint to the existing equipment base, or a catalog search for standard equipment. It is then not surprising, that

  19. 21 CFR 870.4200 - Cardiopulmonary bypass accessory equipment.

    Science.gov (United States)

    2010-04-01

    ... Cardiopulmonary bypass accessory equipment. (a) Identification. Cardiopulmonary bypass accessory equipment is a... mounting bracket or system-priming equipment. (b) Classification. (1) Class I. The device is classified as class I if it does not involve an electrical connection to the patient. The device is exempt from the...

  20. Electronic quality control on dental x-rays equipment

    International Nuclear Information System (INIS)

    Pomares C, Martin

    1996-09-01

    A brief description of dental x-ray equipment is done. The non-invasive quality control is treated as than the responsibilities from the dentists to the patient and the equipment. A propose for quality control for dental x-ray equipment, film and developer is include

  1. 29 CFR 1926.603 - Pile driving equipment.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 8 2010-07-01 2010-07-01 false Pile driving equipment. 1926.603 Section 1926.603 Labor... Operations § 1926.603 Pile driving equipment. (a) General requirements. (1) Boilers and piping systems which are a part of, or used with, pile driving equipment shall meet the applicable requirements of the...

  2. 48 CFR 908.7112 - Materials handling equipment replacement standards.

    Science.gov (United States)

    2010-10-01

    ... equipment replacement standards. 908.7112 Section 908.7112 Federal Acquisition Regulations System DEPARTMENT... Special Items 908.7112 Materials handling equipment replacement standards. Materials handling equipment shall be purchased for replacement purposes in accordance with the standards in FPMR 41 CFR 101-25.405...

  3. 7 CFR 3015.169 - Equipment management requirements.

    Science.gov (United States)

    2010-01-01

    ... following requirements (including replacement equipment) until such actions as transfer, replacement or... transfer, replacement, or disposal of the equipment. (b) Every two years, at a minimum, a physical... 7 Agriculture 15 2010-01-01 2010-01-01 false Equipment management requirements. 3015.169 Section...

  4. 7 CFR 550.39 - Equipment replacement insurance.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Equipment replacement insurance. 550.39 Section 550.39... Agreements Equipment/property Standards § 550.39 Equipment replacement insurance. If required by the terms and conditions of the award, the Cooperator shall provide adequate insurance coverage for replacement...

  5. 7 CFR 3015.168 - Disposal of equipment.

    Science.gov (United States)

    2010-01-01

    ..., DEPARTMENT OF AGRICULTURE UNIFORM FEDERAL ASSISTANCE REGULATIONS Property § 3015.168 Disposal of equipment. When original or replacement equipment is no longer to be used in projects or programs currently or... 7 Agriculture 15 2010-01-01 2010-01-01 false Disposal of equipment. 3015.168 Section 3015.168...

  6. 47 CFR 15.118 - Cable ready consumer electronics equipment.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Cable ready consumer electronics equipment. 15... Unintentional Radiators § 15.118 Cable ready consumer electronics equipment. (a) All consumer electronics TV... provisions of this section. Consumer electronics TV receiving equipment that includes features intended for...

  7. 46 CFR 28.130 - Survival craft equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 1 2010-10-01 2010-10-01 false Survival craft equipment. 28.130 Section 28.130 Shipping... INDUSTRY VESSELS Requirements for All Vessels § 28.130 Survival craft equipment. (a) General. Each item of survival craft equipment must be of good quality, effective for the purpose it is intended to serve, and...

  8. [Application of information management system about medical equipment].

    Science.gov (United States)

    Hang, Jianjin; Zhang, Chaoqun; Wu, Xiang-Yang

    2011-05-01

    Based on the practice of workflow, information management system about medical equipment was developed and its functions such as gathering, browsing, inquiring and counting were introduced. With dynamic and complete case management of medical equipment, the system improved the management of medical equipment.

  9. 14 CFR 91.213 - Inoperative instruments and equipment.

    Science.gov (United States)

    2010-01-01

    ... specific operations by this part. (c) A person authorized to use an approved Minimum Equipment List issued... a master minimum equipment list has not been developed; or (ii) Small rotorcraft, nonturbine-powered small airplane, glider, or lighter-than-air aircraft for which a Master Minimum Equipment List has been...

  10. 46 CFR 169.685 - Electric heating and cooking equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Electric heating and cooking equipment. 169.685 Section... More on Vessels of Less Than 100 Gross Tons § 169.685 Electric heating and cooking equipment. (a) Each...) All electric cooking equipment, attachments, and devices, must be of rugged construction and so...

  11. Equipment inspection function; A funcao inspecao de equipamentos

    Energy Technology Data Exchange (ETDEWEB)

    Bressan, Edemir [PETROBRAS (Brazil). Refinaria Alberto Pasqualini

    1994-04-01

    Development of the safety engineering and equipment inspection policy in petroleum industry, with emphasis to the refineries equipment, are discussed. Presentation of the accidents percentages in petroleum plants under international researches, with details of involved equipment, kind of accident, plant and causes are reported. The start and actual stage of the safety inspection program in the PETROBRAS are also presented 5 refs., 3 figs.

  12. 27 CFR 6.43 - Sale of equipment.

    Science.gov (United States)

    2010-04-01

    ... OF THE TREASURY LIQUORS âTIED-HOUSEâ Unlawful Inducements Furnishing Things of Value § 6.43 Sale of equipment. A transaction in which equipment is sold to a retailer by an industry member, except as provided.... Further, the negotiation by an industry member of a special price to a retailer for equipment from an...

  13. 14 CFR 125.203 - Communication and navigation equipment.

    Science.gov (United States)

    2010-01-01

    ... within the degree of accuracy required for ATC; (ii) One marker beacon receiver providing visual and... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Communication and navigation equipment. 125... Equipment Requirements § 125.203 Communication and navigation equipment. (a) Communication equipment—general...

  14. 14 CFR 25.1439 - Protective breathing equipment.

    Science.gov (United States)

    2010-01-01

    ... also enable the flightcrew to use radio equipment. (4) The part of the equipment protecting the eyes... Regulations: (1) The equipment must be designed to protect the appropriate crewmember from smoke, carbon... must include— (i) Masks covering the eyes, nose and mouth, or (ii) Masks covering the nose and mouth...

  15. 77 FR 75400 - Labeling Requirements for Commercial and Industrial Equipment

    Science.gov (United States)

    2012-12-20

    ...-intensity discharge lamps, distribution transformers, and small electric motors as covered equipment. (42 U... following: Electric motors and pumps; commercial HVAC and water heating equipment (small, large, and very... prescribed for certain types of covered equipment. Specific requirements are established for electric motors...

  16. 46 CFR Sec. 12 - Disposition of removed equipment and scrap.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 8 2010-10-01 2010-10-01 false Disposition of removed equipment and scrap. Sec. 12... CONTRACT-NSA-LUMPSUMREP Sec. 12 Disposition of removed equipment and scrap. (a) Article 8 of the NSA-LUMPSUMREP Contract provides that any ship equipment, fuel, lube oil, supplies, stores, furniture, fixtures...

  17. 14 CFR 125.223 - Airborne weather radar equipment requirements.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Airborne weather radar equipment... Equipment Requirements § 125.223 Airborne weather radar equipment requirements. (a) No person may operate an airplane governed by this part in passenger-carrying operations unless approved airborne weather radar...

  18. 14 CFR 135.175 - Airborne weather radar equipment requirements.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Airborne weather radar equipment... Aircraft and Equipment § 135.175 Airborne weather radar equipment requirements. (a) No person may operate a large, transport category aircraft in passenger-carrying operations unless approved airborne weather...

  19. 14 CFR 121.357 - Airborne weather radar equipment requirements.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Airborne weather radar equipment... § 121.357 Airborne weather radar equipment requirements. (a) No person may operate any transport... December 31, 1964, unless approved airborne weather radar equipment has been installed in the airplane. (b...

  20. 40 CFR 63.424 - Standards: Equipment leaks.

    Science.gov (United States)

    2010-07-01

    ....424 Standards: Equipment leaks. (a) Each owner or operator of a bulk gasoline terminal or pipeline... location of all equipment in gasoline service at the facility. (c) Each detection of a liquid or vapor leak... replacement of leaking equipment shall be completed within 15 calendar days after detection of each leak...