WorldWideScience

Sample records for e-waste dismantling area

  1. Characteristics of organic matter in PM2.5 from an e-waste dismantling area in Taizhou, China.

    Science.gov (United States)

    Gu, Zeping; Feng, Jialiang; Han, Wenliang; Wu, Minghong; Fu, Jiamo; Sheng, Guoying

    2010-08-01

    Solvent extractable organic compounds in PM(2.5) samples collected in Taizhou, a city famous for its electrical and electronic waste (e-waste) recycling industry in Zhejiang province of China, were analyzed to identify the main emission sources based on molecular markers. Two types of plastics which were most frequently contained in the e-wastes, wires/cables and plastic blocks, were burned in the lab and the particles emitted analyzed. The concentrations of PAHs and phthalate esters at the e-waste dismantling area during our sampling periods were about two times of that at the reference urban site, indicating the high pollution level there. The high concentrations of quaterphenyl found at the dismantling area indicated that burning of plastics or polymers was an important emission source of the PAHs in the fine particles. The diagnostic analysis based on the compositions of alkanes, hopanes and other molecular markers showed that engine exhaust, biomass burning and kitchen emissions were also important emission sources at the e-waste dismantling area. Our results suggested that more effort should be paid to control the correlative emission sources such as transportation and kitchen to achieve better air quality at the e-waste dismantling area besides regulating the recycling activities. Copyright 2010 Elsevier Ltd. All rights reserved.

  2. Heavy metal contamination of surface soil in electronic waste dismantling area: site investigation and source-apportionment analysis.

    Science.gov (United States)

    Jinhui Li; Huabo Duan; Pixing Shi

    2011-07-01

    The dismantling and disposal of electronic waste (e-waste) in developing countries is causing increasing concern because of its impacts on the environment and risks to human health. Heavy-metal concentrations in the surface soils of Guiyu (Guangdong Province, China) were monitored to determine the status of heavy-metal contamination on e-waste dismantling area with a more than 20 years history. Two metalloids and nine metals were selected for investigation. This paper also attempts to compare the data among a variety of e-waste dismantling areas, after reviewing a number of heavy-metal contamination-related studies in such areas in China over the past decade. In addition, source apportionment of heavy metal in the surface soil of these areas has been analysed. Both the MSW open-burning sites probably contained invaluable e-waste and abandoned sites formerly involved in informal recycling activities are the new sources of soil-based environmental pollution in Guiyu. Although printed circuit board waste is thought to be the main source of heavy-metal emissions during e-waste processing, requirement is necessary to soundly manage the plastic separated from e-waste, which mostly contains heavy metals and other toxic substances.

  3. Association of PCB, PBDE and PCDD/F body burdens with hormone levels for children in an e-waste dismantling area of Zhejiang Province, China

    Energy Technology Data Exchange (ETDEWEB)

    Xu, Peiwei, E-mail: pwxu@cdc.zj.cn; Lou, Xiaoming; Ding, Gangqiang; Shen, Haitao; Wu, Lizhi; Chen, Zhijian; Han, Jianlong; Han, Guangen; Wang, Xiaofeng, E-mail: zjcdcwxf@gmail.com

    2014-11-15

    Increased electronic waste (e-waste) has raised public concerns regarding exposure to numerous toxic contaminants, particularly polychlorinated biphenyls (PCBs), polybrominated diphenyl ethers (PBDEs) and polychlorinated dibenzo-p-dioxins and dibenzofurans (PCDD/Fs). In China, the body burdens of PCBs, PBDEs and PCDD/Fs are associated with thyroid hormones in populations from e-waste dismantling sites; however, it is unclear whether this association occurs in children. In this study, we determined the serum levels of PCBs, PBDEs and PCDD/Fs and the endocrine hormones including free triiodothyronine (FT3), total triiodothyronine (TT3), free thyroxine (FT4), total thyroxine (TT4), thyroid-stimulating hormone (TSH), adrenocorticotropic hormone (ACTH), cortisol and growth hormone (GH) in 21 children from an e-waste dismantling area and 24 children from a control area. The results showed that the mean levels of ∑ PCBs and ∑ PBDEs in the exposure group were significantly higher than in the control group (40.56 and 32.09 ng g{sup −1} lipid vs. 20.69 and 8.43 ng g{sup −1} lipid, respectively, p < 0.01 for each), and the mean level of ∑ PCDD/Fs in the exposure group was higher than in the control group, but the difference was not significant (206.17 vs. 160.27 pg g{sup −1} lipid, p > 0.05). For the endocrine hormones, we did not find significant differences between the exposed and control groups, although the mean levels of FT3, TT3, TT4, ACTH, cortisol and GH were higher, whereas the mean levels of FT4 and TSH were lower in the exposed group. The mean level of ∑ PBDEs was positively correlated with the mean levels of ∑ PCBs (r = 0.60, p < 0.05) and ∑ PCDD/Fs (r = 0.61, p < 0.05). Furthermore, the mean level of ∑ PBDEs was positively correlated with ACTH (r = 0.61, p < 0.05). In conclusion, our data suggested that exposure to e-waste dismantling environment increased the body burdens of PCBs and PBDEs in local children and that these contaminants

  4. Association of PCB, PBDE and PCDD/F body burdens with hormone levels for children in an e-waste dismantling area of Zhejiang Province, China

    International Nuclear Information System (INIS)

    Xu, Peiwei; Lou, Xiaoming; Ding, Gangqiang; Shen, Haitao; Wu, Lizhi; Chen, Zhijian; Han, Jianlong; Han, Guangen; Wang, Xiaofeng

    2014-01-01

    Increased electronic waste (e-waste) has raised public concerns regarding exposure to numerous toxic contaminants, particularly polychlorinated biphenyls (PCBs), polybrominated diphenyl ethers (PBDEs) and polychlorinated dibenzo-p-dioxins and dibenzofurans (PCDD/Fs). In China, the body burdens of PCBs, PBDEs and PCDD/Fs are associated with thyroid hormones in populations from e-waste dismantling sites; however, it is unclear whether this association occurs in children. In this study, we determined the serum levels of PCBs, PBDEs and PCDD/Fs and the endocrine hormones including free triiodothyronine (FT3), total triiodothyronine (TT3), free thyroxine (FT4), total thyroxine (TT4), thyroid-stimulating hormone (TSH), adrenocorticotropic hormone (ACTH), cortisol and growth hormone (GH) in 21 children from an e-waste dismantling area and 24 children from a control area. The results showed that the mean levels of ∑ PCBs and ∑ PBDEs in the exposure group were significantly higher than in the control group (40.56 and 32.09 ng g −1 lipid vs. 20.69 and 8.43 ng g −1 lipid, respectively, p < 0.01 for each), and the mean level of ∑ PCDD/Fs in the exposure group was higher than in the control group, but the difference was not significant (206.17 vs. 160.27 pg g −1 lipid, p > 0.05). For the endocrine hormones, we did not find significant differences between the exposed and control groups, although the mean levels of FT3, TT3, TT4, ACTH, cortisol and GH were higher, whereas the mean levels of FT4 and TSH were lower in the exposed group. The mean level of ∑ PBDEs was positively correlated with the mean levels of ∑ PCBs (r = 0.60, p < 0.05) and ∑ PCDD/Fs (r = 0.61, p < 0.05). Furthermore, the mean level of ∑ PBDEs was positively correlated with ACTH (r = 0.61, p < 0.05). In conclusion, our data suggested that exposure to e-waste dismantling environment increased the body burdens of PCBs and PBDEs in local children and that these contaminants released from the e-waste

  5. Effects of PCBs and PBDEs on thyroid hormone, lymphocyte proliferation, hematology and kidney injury markers in residents of an e-waste dismantling area in Zhejiang, China

    Energy Technology Data Exchange (ETDEWEB)

    Xu, Peiwei, E-mail: pwxu@cdc.zj.cn; Lou, Xiaoming; Ding, Gangqiang, E-mail: gqding@cdc.zj.cn; Shen, Haitao; Wu, Lizhi; Chen, Zhijian; Han, Jianlong; Wang, Xiaofeng, E-mail: zjcdcwxf@gmail.com

    2015-12-01

    Polychlorinated biphenyls (PCBs) and polybrominated diphenyl ethers (PBDEs) are two typical categories of contaminants released from e-waste dismantling environments. In China, the body burdens of PCBs and PBDEs are associated with abnormal thyroid hormones in populations from e-waste dismantling sites, but the results are limited and contradictory. In this study, we measured the serum levels of PCBs and PBDEs and the thyroid hormone free triiodothyronine (FT3), free thyroxine (FT4) and thyroid-stimulating hormone (TSH) in 40 residents in an e-waste dismantling area and in 15 residents in a control area. Additionally, we also measured some lymphocyte proliferation indexes, hematologic parameters and kidney injury markers, including white blood cells, neutrophils, monocytes, lymphocytes, hemoglobin, platelets, serum creatinine and beta 2-microglobulin (β{sub 2}-MG). The results indicated that the mean level of ΣPCBs in the exposure group was significantly higher than that in the control group (964.39 and 67.98 ng g{sup −1}, p < 0.0001), but the mean level of ΣPBDEs in the exposure group was not significantly higher than that in the controls (139.32 vs. 75.74 ng g{sup −1}, p > 0.05). We determined that serum levels of FT3, FT4, monocytes and lymphocytes were significantly lower, whereas the levels of neutrophils, hemoglobin, platelets and serum creatinine were significantly higher in the exposed group (p < 0.05). The mean level of ΣPCBs was negatively correlated with levels of FT3, FT4, monocytes and lymphocytes (p < 0.05) and positively correlated with levels of neutrophils, hemoglobin, serum creatinine and β{sub 2}-MG (p < 0.05). Additionally, the mean level of ΣPBDEs was positively correlated with levels of white blood cells, hemoglobin and platelets (p < 0.05). Our data suggest that exposure to an e-waste dismantling environment may increase the body burdens of PCBs and the specific PBDEs congeners in native residents and that the contaminants released

  6. Effects of environmental lead pollution on blood lead and sex hormone levels among occupationally exposed group in an E-waste dismantling area.

    Science.gov (United States)

    Yang, Yan; Lu, Xiao Song; Li, Ding Long; Yu, Yun Jiang

    2013-06-01

    To study the effects of environmental multi-media lead pollution on blood lead and sex hormone levels among lead exposed males engaged in E-waste dismantling, and the correlation between confounding factors and sex hormone levels. An E-waste dismantling area in Taizhou of Zhejiang Province was selected as the research site. One hundred and fifty two samples were collected from the groundwater, soil, rice, corn, chicken, and pork in the dismantling area. The effects of the multi-media lead pollution on the male blood lead and sex hormone levels of FSH, LH, and T, as well as the correlation with confounding factors, were studied. The blood lead concentrations in the males aged under 31, from 31 to 45 and from 46 to 60 were 98.55, 100.23, and 101.45 μg/L, respectively. Of all the environmental media lead exposures, the groundwater, rice and soil were main contributing factors to the lead accumulation in humans. FSH and LH levels increased with the age while the T levels decreased with the age instead. There was a significant correlation between the FSH and LH levels and wearing masks. There was correlation between the FSH, LH, and T levels, and the mean values of lead concentrations in environmental media, and the sex hormone levels were correlated with the confounding factor of wearing masks. Copyright © 2013 The Editorial Board of Biomedical and Environmental Sciences. Published by China CDC. All rights reserved.

  7. Short-chain chlorinated paraffins in soil, paddy seeds (Oryza sativa) and snails (Ampullariidae) in an e-waste dismantling area in China: Homologue group pattern, spatial distribution and risk assessment.

    Science.gov (United States)

    Yuan, Bo; Fu, Jianjie; Wang, Yawei; Jiang, Guibin

    2017-01-01

    Short-chain chlorinated paraffins (SCCPs) in multi-environmental matrices are studied in Taizhou, Zhejiang Province, China, which is a notorious e-waste dismantling area. The investigated matrices consist of paddy field soil, paddy seeds (Oryza sativa, separated into hulls and rice unpolished) and apple snails (Ampullariidae, inhabiting the paddy fields). The sampling area covered a 65-km radius around the contamination center. C 10 and C 11 are the two predominant homologue groups in the area, accounting for about 35.7% and 33.0% of total SCCPs, respectively. SCCPs in snails and hulls are generally higher than in soil samples (30.4-530 ng/g dw), and SCCPs in hulls are approximate five times higher than in corresponding rice samples (4.90-55.1 ng/g dw). Homologue pattern analysis indicates that paddy seeds (both hull and rice) tend to accumulate relatively high volatile SCCP homologues, especially the ones with shorter carbon chain length, while snails tend to accumulate relatively high lipophilic homologues, especially the ones with more substituted chlorines. SCCPs in both paddy seeds and snails are linearly related to those in the soil. The e-waste dismantling area, which covers a radius of approximate 20 km, shows higher pollution levels for SCCPs according to their spatial distribution in four matrices. The preliminary assessment indicates that SCCP levels in local soils pose no significant ecological risk for soil dwelling organisms, but higher risks from dietary exposure of SCCPs are suspected for people living in e-waste dismantling area. Copyright © 2016 Elsevier Ltd. All rights reserved.

  8. The Japan Power Demonstration Reactor (JPDR) dismantling activities. Management of JPDR dismantling waste

    International Nuclear Information System (INIS)

    Abe, Masayoshi; Nakata, Susumu; Ito, Shinichi

    1996-01-01

    The management of wastes, both radioactive and non-radioactive, is one of the most important issues for a safe and reasonable dismantling operation of nuclear power plants. A large amount of radioactive wastes is arising from a reactor dismantling operation in a relatively short period time, ranging in a wide variety from very low level to relatively high level. Moreover non-radioactive waste is also in a huge amount. The dismantling operation of Japan Power Demonstration Reactor (JPDR) resulted in 24,440 tons of dismantling wastes, of which about 15% was radioactive and 85% non-radioactive. These wastes were managed successfully implementing a well developed management plan for JPDR dismantling waste. Research and development works for handling of JPDR dismantling wastes were performed, including fixation of loose contamination on surface, volume reduction and waste containers for on-site transportation and interim storage. The JPDR dismantling wastes generated were classified and categorized depending on their materials, characteristics and activity level. Approximately 2,100 tons of radioactive wastes were stored in the interim storage facilities on site using developed containers, and 1,670 tons of radioactive concrete waste were used for a safe demonstration test of a simple near-surface disposal for very low level waste. Other dismantling wastes such as steel and concrete which were categorized as non-radioactive were recycled and reused as useful resources. This paper describes the management of the JPDR dismantling wastes. (author)

  9. PCDD/Fs in air and soil around an e-waste dismantling area with open burning of insulated wires in south China.

    Science.gov (United States)

    Ren, M; Tang, Y H; Peng, P A; Cai, Y

    2015-05-01

    Polychlorinated dibenzo-p-dioxins and dibenzofurans (PCDD/Fs) in ambient air and farmland soil sampled in 2006 around an e-waste dismantling area with open burning of insulated wires in Longtang in south China were investigated. The total toxic equivalent concentrations of PCDD/Fs were 3.2-31.7 pg/m(3) in air and 5.8 12.4 ng/kg in farmland soil at an e-waste site and 0.063-0.091 pg/m(3) in air at a background site. PCDD/Fs in the air at the e-waste site were characterized with dominant 1,2,3,4,6,7,8-HpCDF and OCDF and higher concentrations of furans than dioxins, suggesting open burning of insulated wires was likely to be the main source of PCDD/Fs. Compared with the results in this study, the level of PCDD/F tended to lessen with the average TEQ concentration decreasing by 41 % and the pattern changed to be dominated by OCDD in the air of Longtang in 2010 when insulated wires were openly burned in only a small scale. Our results indicate that the lower chlorinated congeners with higher vapor pressures have enhanced atmospheric transport tendencies.

  10. Dismantlement and Radioactive Waste Management of DPRK Nuclear Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Jooho, W.; Baldwin, G. T.

    2005-04-01

    One critical aspect of any denuclearization of the Democratic People’s Republic of Korea (DPRK) involves dismantlement of its nuclear facilities and management of their associated radioactive wastes. The decommissioning problem for its two principal operational plutonium facilities at Yongbyun, the 5MWe nuclear reactor and the Radiochemical Laboratory reprocessing facility, alone present a formidable challenge. Dismantling those facilities will create radioactive waste in addition to existing inventories of spent fuel and reprocessing wastes. Negotiations with the DPRK, such as the Six Party Talks, need to appreciate the enormous scale of the radioactive waste management problem resulting from dismantlement. The two operating plutonium facilities, along with their legacy wastes, will result in anywhere from 50 to 100 metric tons of uranium spent fuel, as much as 500,000 liters of liquid high-level waste, as well as miscellaneous high-level waste sources from the Radiochemical Laboratory. A substantial quantity of intermediate-level waste will result from disposing 600 metric tons of graphite from the reactor, an undetermined quantity of chemical decladding liquid waste from reprocessing, and hundreds of tons of contaminated concrete and metal from facility dismantlement. Various facilities for dismantlement, decontamination, waste treatment and packaging, and storage will be needed. The shipment of spent fuel and liquid high level waste out of the DPRK is also likely to be required. Nuclear facility dismantlement and radioactive waste management in the DPRK are all the more difficult because of nuclear nonproliferation constraints, including the call by the United States for “complete, verifiable and irreversible dismantlement,” or “CVID.” It is desirable to accomplish dismantlement quickly, but many aspects of the radioactive waste management cannot be achieved without careful assessment, planning and preparation, sustained commitment, and long

  11. Dismantlement and Radioactive Waste Management of DPRK Nuclear Facilities

    International Nuclear Information System (INIS)

    Jooho, W.; Baldwin, G.T.

    2005-01-01

    One critical aspect of any denuclearization of the Democratic People's Republic of Korea (DPRK) involves dismantlement of its nuclear facilities and management of their associated radioactive wastes. The decommissioning problem for its two principal operational plutonium facilities at Yongbyun, the 5MWe nuclear reactor and the Radiochemical Laboratory reprocessing facility, alone present a formidable challenge. Dismantling those facilities will create radioactive waste in addition to existing inventories of spent fuel and reprocessing wastes. Negotiations with the DPRK, such as the Six Party Talks, need to appreciate the enormous scale of the radioactive waste management problem resulting from dismantlement. The two operating plutonium facilities, along with their legacy wastes, will result in anywhere from 50 to 100 metric tons of uranium spent fuel, as much as 500,000 liters of liquid high-level waste, as well as miscellaneous high-level waste sources from the Radiochemical Laboratory. A substantial quantity of intermediate-level waste will result from disposing 600 metric tons of graphite from the reactor, an undetermined quantity of chemical decladding liquid waste from reprocessing, and hundreds of tons of contaminated concrete and metal from facility dismantlement. Various facilities for dismantlement, decontamination, waste treatment and packaging, and storage will be needed. The shipment of spent fuel and liquid high level waste out of the DPRK is also likely to be required. Nuclear facility dismantlement and radioactive waste management in the DPRK are all the more difficult because of nuclear nonproliferation constraints, including the call by the United States for 'complete, verifiable and irreversible dismantlement,' or 'CVID.' It is desirable to accomplish dismantlement quickly, but many aspects of the radioactive waste management cannot be achieved without careful assessment, planning and preparation, sustained commitment, and long completion times

  12. Chemical Decontamination of Metallic Waste from Uranium Conversion Plant Dismantling

    International Nuclear Information System (INIS)

    Hwang, D. S.; Choi, Y. D.; Hwang, S. T.; Park, J. H.; Byun, J. I.; Jang, N. S.

    2005-01-01

    Korea Atomic Energy Research Institute (KAERI) started a decommissioning program of the uranium conversion plant. Pre-work was carried as follows; installation of the access control facility, installation of a changing room and shower room, designation of an emergency exit way and indicating signs, installation of a radiation management facility, preparation of a storage area for tools and equipments, inspection and load test of crane, distribution and packaging of existing waste, and pre-decontamination of the equipment surface and the interior. First, decommissioning work was performed in kiln room, which will be used for temporary radioactive waste storage room. Kiln room housed hydro fluorination rotary kiln for production of uranium tetra-fluoride. The kiln is about 0.8 m in diameter and 5.5 m long. The total dismantled waste was 6,690 kg, 73 % of which was metallic waste and 27 % the others such as cable, asbestos, concrete, secondary waste, etc. And effluent treatment room and filtration room were dismantled for installation of decontamination equipment and lagoon sludge treatment equipment. There were tanks and square mixer in these rooms. The total dismantled waste was 17,250 kg, 67% of which was metallic waste and 33% the others. These dismantled metallic wastes consist of stainless and carbon steel. In this paper, the stainless steel plate and pipe were decontaminated by the chemical decontamination with ultrasonic

  13. Nuclab Marcoule: a dedicated waste management and dismantling support laboratory

    International Nuclear Information System (INIS)

    Dugne, Olivier; Bec-Espitalier, Lionel; Rosen, Jeremy

    2014-01-01

    Formerly dedicated to plutonium production support, NucLab was renovated to perform a wide range of analyses for dismantling, plant operation and process development activities mainly at Marcoule but also for external clients. The laboratory is a CEA entity in the Nuclear Energy Division. It provides services to several industrial operators (nuclear processes and power plants) in the fields of analytical chemistry, radioactivity measurements, in situ nuclear measurements, decontamination processes, industrial chemistry processes, and waste treatment. NucLab supports research, production, and dismantling activities in all areas of dismantling operations (authors)

  14. Dismantling and waste management: CEA's strategy and research programs

    International Nuclear Information System (INIS)

    Behar, C.

    2012-01-01

    There are 3 main dismantling operations in CEA. First, the dismantling of the UP1 facility in the Marcoule site. UP1 was a reprocessing plant of nuclear fuels that operated from 1958 to 1997 and is now the biggest dismantling operation in the world. Its dismantling operation follows a 6-step scheme that will end in 2050. Secondly, the Passage project on the Grenoble site that concerns the dismantling of 3 research reactors (Siloette, Melusine and Siloe), of a laboratory dedicated to the analysis of active materials (Lama) and of a station for the processing of waste (Sted). Thirdly the Aladin project that concerns the installations of the Fontenay-aux-Roses site. The dismantling operations are complex because all the first research programs on high activity chemistry and on transuranium elements were performed in Fontenay-aux-Roses facilities and because ancient activities have to leave a clean place to be replaced by new ones. The radioactive waste produced by CEA enter the flow of waste that is normally processed and managed by ANDRA. Only high-activities waste have not yet a definitive solution, they are stored in waiting the opening of a geological repository. CEA leads research programs on the separation and transmutation of minor actinides and on the long-term behaviour of waste packages put in deep geological layers. (A.C.)

  15. Children with health impairments by heavy metals in an e-waste recycling area

    NARCIS (Netherlands)

    Zeng, Xiang; Xu, Xijin; Boezen, H. Marike; Huo, Xia

    E-waste recycling has become a global environmental health issue. Pernicious chemicals escape into the environment due to informal and nonstandard e-waste recycling activities involving manual dismantling, open burning to recover heavy metals and open dumping of residual fractions. Heavy metals

  16. Importance of low-level radioactive wastes in dismantling strategy in CEA (FRANCE)

    International Nuclear Information System (INIS)

    Lafaille, C.

    1991-01-01

    This paper describes the advance used in C.E.A. to realize dismantling operations in the best technical and economical conditions. Particularly, for low-level radioactive waste management CEA's advance defines, first, the final destination of dismantling materials: - recycling in public lands for level activity inferior to 1 Bq/g; directly or after transformation (melting, calcination, extrusion) - storage in a ground disposal, after compacting, encapsulation or drumming. Two examples are given: - Marcoule G2 - G3 reactor dismantling - Gaseous diffusion plants demolition (COGEMA Pierrelatte)

  17. Challenges of dismantling

    International Nuclear Information System (INIS)

    Chevet, P.F.; Schilz, F.; Rondeau, J.M.; Piketty, L.; Dupraz, B.; Conte, D.; Duguey, M.; Louet, C.A.; Dorison, A.; Dutzer, M.; Boucau, J.; Eimer, M.; Boutin, D.; Revilla, J.L.; Golshan, M.; Smith, G.

    2015-01-01

    This document is made up of short articles whose issue is reactor dismantling. The first article presents the French strategy that can be featured by immediate dismantling (the dismantling process is prepared a long time before decommissioning and begins as soon as the reactor is shut down) and massive dismantling (a lot of nuclear facilities will be decommissioned in a near future). The following 4 articles give the viewpoints of ASN (Nuclear Safety Authority), EDF (for its fleet of PWRs), CEA (for its experimental reactors and nuclear facilities) and AREVA (for the EURODIF George Besse plant). Costs and financing are dealt with in an article that says that the cost is greatly dependent on the final state: a complete nuclear-free area or an area whose radioactivity is below safe standards and that law implies to constitute provisions all along the operating life of the facility to cover dismantling costs. Dismantling generates a huge amount of very low-level radioactive wastes particularly metal scraps that might be recycled and get out of nuclear industry, an article details the feasibility of such recycling. Another article shows the impact of massive dismantling on the management of radioactive wastes. In an article Westinghouse presents its experience in the cutting of internal equipment of the reactor core. The last 2 articles presents the dismantling strategies in Spain and in the UK. (A.C.)

  18. Waste management concept during dismantling of KKS NPP in Germany

    International Nuclear Information System (INIS)

    Bacmeister, Georg U.

    2008-01-01

    Full text: This paper gives an overview on the waste management of NPP Stade during dismantling. The general idea is to reduce the radioactive waste to about three percentage of the complete dismantling mass. The NPP Stade in Germany was shut down in November 2003. After a transient phase the license for dismantling was given in 2005. In the following 8 years about 20.000 tones of steel and 120.000 tones of concrete will be put out by the dismantling. The yearly output of steel will by about 100 times higher than during the running time of the NNP. For this a new processes for waste management had to be installed. The waste management during dismantling focus on free release (about 97%). Beside some minor exception, the rest is deemed to be radioactive waste. This will be collected in 1000 packages, which are ready to be sent to a final storage. As until now in Germany no final storage is open (and sending of radioactive waste to another country is forbidden), the NNP Stade build an intermediate storage, where the packages may by saved for longest 40 years. The clearance procedure in Germany is regulated in the radiation protection ordinances. It is based on a nuclide specific set of clearance levels. To fulfil these demands the NNP Stade chose a semi automated system for characterization and documentation, which we develop in accordance to our release license. It guaranties a most accurate determination of the relevant nuclides for a set of dismantling material (some 10 to 100 tones). After the characterization only the gamma-activity of the material is measured in boxes of about 500 kg. A short comparison of the chosen procedure with other options, possible in Germany will be given and the decision from the collaboration with the NPP in Barsebaeck, Sweden, will be withdrawn. Beside the free release different options are used for waste management, like incineration, sending to landfill or reuse in nuclear industry. The waste management of the NNP Stade take

  19. Radiation protection during backfitting or dismantling work in the controlled area of nuclear facilities

    International Nuclear Information System (INIS)

    Baumann, J.; Kausch, S.; Palmowski, J.

    1980-01-01

    Backfitting measures or dismantling activities within the controlled area put special requirements on radiological protection. This is to be shown by the example of the following cases. Sanitation of the general decontamination services of the Karlsruhe Nuclear Research Center; waste water, equipment decontamination, incineration and packaging facility; dismantling and disposal of high-radiation components including decontamination of buildings of the Eurochemic reprocessing plant at Mol; reconstruction of the HDR plant for safety experiments together with waste management for components and systems, as e.g. pressure vessel internals, pipes etc.; exchange of the steam dryer and the water separator including planning of the conditioning process in the Wuergassen nuclear power plant. This lecture deals with the engineering and organizational problems, especially accounting for radiological protection and enters into planning of measures for radiological protection, their organization and execution, problems of direct and remote-controlled work also being discussed. The question of personnel qualification is also commented on. (orig.) [de

  20. Waste Management Strategy for Dismantling Waste to Reduce Costs for Power Plant Decommissioning - 13543

    Energy Technology Data Exchange (ETDEWEB)

    Larsson, Arne; Lidar, Per [Studsvik Nuclear AB, SE-611 82 Nykoeping (Sweden); Bergh, Niklas; Hedin, Gunnar [Westinghouse Electric Sweden AB, Fredholmsgatan 2, SE-721 63, Vaesteraas (Sweden)

    2013-07-01

    Decommissioning of nuclear power plants generates large volumes of radioactive or potentially radioactive waste. The proper management of the dismantling waste plays an important role for the time needed for the dismantling phase and thus is critical to the decommissioning cost. An efficient and thorough process for inventorying, characterization and categorization of the waste provides a sound basis for the planning process. As part of comprehensive decommissioning studies for Nordic NPPs, Westinghouse has developed the decommissioning inventories that have been used for estimations of the duration of specific work packages and the corresponding costs. As part of creating the design basis for a national repository for decommissioning waste, the total production of different categories of waste packages has also been predicted. Studsvik has developed a risk based concept for categorization and handling of the generated waste using six different categories with a span from extremely small risk for radiological contamination to high level waste. The two companies have recently joined their skills in the area of decommissioning on selected market in a consortium named 'ndcon' to further strengthen the proposed process. Depending on the risk for radiological contamination or the radiological properties and other properties of importance for waste management, treatment routes are proposed with well-defined and proven methods for on-site or off-site treatment, activity determination and conditioning. The system is based on a graded approach philosophy aiming for high confidence and sustainability, aiming for re-use and recycling where found applicable. The objective is to establish a process where all dismantled material has a pre-determined treatment route. These routes should through measurements, categorization, treatment, conditioning, intermediate storage and final disposal be designed to provide a steady, un-disturbed flow of material to avoid

  1. Waste Management Strategy for Dismantling Waste to Reduce Costs for Power Plant Decommissioning - 13543

    International Nuclear Information System (INIS)

    Larsson, Arne; Lidar, Per; Bergh, Niklas; Hedin, Gunnar

    2013-01-01

    Decommissioning of nuclear power plants generates large volumes of radioactive or potentially radioactive waste. The proper management of the dismantling waste plays an important role for the time needed for the dismantling phase and thus is critical to the decommissioning cost. An efficient and thorough process for inventorying, characterization and categorization of the waste provides a sound basis for the planning process. As part of comprehensive decommissioning studies for Nordic NPPs, Westinghouse has developed the decommissioning inventories that have been used for estimations of the duration of specific work packages and the corresponding costs. As part of creating the design basis for a national repository for decommissioning waste, the total production of different categories of waste packages has also been predicted. Studsvik has developed a risk based concept for categorization and handling of the generated waste using six different categories with a span from extremely small risk for radiological contamination to high level waste. The two companies have recently joined their skills in the area of decommissioning on selected market in a consortium named 'ndcon' to further strengthen the proposed process. Depending on the risk for radiological contamination or the radiological properties and other properties of importance for waste management, treatment routes are proposed with well-defined and proven methods for on-site or off-site treatment, activity determination and conditioning. The system is based on a graded approach philosophy aiming for high confidence and sustainability, aiming for re-use and recycling where found applicable. The objective is to establish a process where all dismantled material has a pre-determined treatment route. These routes should through measurements, categorization, treatment, conditioning, intermediate storage and final disposal be designed to provide a steady, un-disturbed flow of material to avoid interruptions. Bottle

  2. Quantity assessment of waste in the dismantlement of liquid waste treatment plant and its actual state

    International Nuclear Information System (INIS)

    Uchiyama, Takafumi; Mitsuhashi, Ishi; Matsumoto, Tetsuo; Morishima, Kayoko; Tanzawa, Tomio

    2016-01-01

    From the progress of decommissioning project work of Tokyo City University Atomic Energy Research Institute, this paper reports the comparison between the actual amount of the waste generated during dismantlement work at liquid waste treatment facilities and the assessment quantity before starting the dismantlement. The quantity assessment was made on the basis of the installation license application, design specifications, drawings, records, history of use, site investigation results, etc. Since this quantity assessment did not take into account the dismantling contents of reservoir concrete, the assessed quantity of non-radioactive waste (NR waste) did not match the sum of actual NR waste. However, if an actually generated quantity of concrete of radioactive waste was added to the quantity assessment as NR waste, the quantity of actually generated NR waste and that of assessed NR waste were nearly consistent, which verified the validity of this assessment. This method is considered to be able to be utilized in the future quantity assessment of decommissioning work and the like. On the other hand, it was found that the number of drums that were actually stored tended to increase more than the estimated number of drum conversion. In old buildings, it is necessary to take into account the generation of waste other than radioactive materials in the quantity assessment stage and dismantlement stage. (A.O.)

  3. Dismantling and waste managing benefit from digital technologies

    International Nuclear Information System (INIS)

    Moitrier, C.

    2017-01-01

    Dismantling is a very important challenge for nuclear industry as its success will prove the ability of the industry to deal with all the stages of a nuclear power plant from design to the end. A dismantling project is constraint by costs, time, feasibility, safety and environment protection and all of this implies a perfect knowledge of both the initial state of the facility at the beginning of the dismantling and the supply chain to avoid delays and extra-costs. Digital tools have a very important role to play as a provider of a 3-dimensional digital twin of the facility. This digital model allows: a remote preparation of the dismantling actions, to assess and optimize the radiation exposure during the intervention, to simulate various scenarios and select the most adequate, to ease collaborative work between various teams, to assess the volume and kind of waste at a very early stage of the dismantling, and to train operators and workers for x. (A.C.)

  4. Taking into account dismantling and decommissioning waste management in conception and operation phases

    International Nuclear Information System (INIS)

    Poncet, Philippe

    2016-01-01

    Managing waste during the Dismantling and Decommissioning (D and D) phase is quite specific and different from what it was during the operation phase. Indeed, waste generated during dismantling could present some analogy especially with regards to the radionuclides spectrum and contents. However waste from dismantling and cleanup could actually presents a lower level of radiologic activity but produced in much larger quantities, which requires new solutions. Moreover the characteristics and quantities of waste to be managed during D and D are highly depending on the way the facility was designed and also how it was actually operated during its life time. Taking future D and D into consideration in the early design as well as during the operation of new facilities is becoming more and more mandatory. It is now an explicit requirement set by safety authorities, to provide - in the license application for news plants - a description of design provisions and future plans for D and D as well as anticipated technical and financial impacts,. Two major aspects are driving the cost and complexity of future D and D operations: waste volumes by categories and occupational exposure while performing the work. To reduce such impacts, key approaches are to maintain areas clean, segregate the waste types and provide appropriate provisions in the design. The paper's first part describes the related design and operation concepts derived from lessons learned, and illustrations by examples are presented in a second part. (author)

  5. Place of the final disposal of short lived dismantling waste; Plats foer slutfoervaring av kortlivat rivningsavfall

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2013-01-15

    This report deals with the short-lived low and intermediate level radioactive waste, which will mainly arise from the dismantling of the Swedish nuclear power plants, but also the dismantling of other nuclear facilities. For these installations to be dismantled, there must be the capacity to receive and dispose of dismantling waste. SKB plans to expand the existing final repository for short-lived radioactive waste (SFR) in Forsmark for this purpose. The legislation requires alternatives to the chosen location. The alternate location for the disposal of decommissioning waste SKB has chosen to compare with is a location in the Simpevarp area outside Oskarshamn. There are currently Oskarshamn nuclear power plant and SKB between stock 'CLAB'. The choice of Simpevarp as alternative location is based on that it's one of the places in the country where data on the bedrock is available to an extent that allows an assessment of the prospects for long-term security, such an assessment is actually showing good potential, and that the location provide realistic opportunities to put into practice the disposal of decommissioning waste. At a comparison between the disposal of short-lived decommissioning waste in an extension of SFR with the option to build a separate repository for short-lived decommissioning waste in Simpevarp, the conclusion is that both options offer potentially good prospects for long-term security. The differences still indicated speaks to the Forsmark advantage. Similar conclusions were obtained when comparing the factors of environment, health and social aspects.

  6. Dismantling of nuclear facilities

    International Nuclear Information System (INIS)

    Tallec, M.; Kus, J.P.

    2009-01-01

    Nuclear facilities have a long estimable lifetime but necessarily limited in time. At the end of their operation period, basic nuclear installations are the object of cleansing operations and transformations that will lead to their definitive decommissioning and then to their dismantling. Because each facility is somewhere unique, cleansing and dismantling require specific techniques. The dismantlement consists in the disassembly and disposing off of big equipments, in the elimination of radioactivity in all rooms of the facility, in the demolition of buildings and eventually in the reconversion of all or part of the facility. This article describes these different steps: 1 - dismantling strategy: main de-construction guidelines, expected final state; 2 - industries and sites: cleansing and dismantling at the CEA, EDF's sites under de-construction; 3 - de-construction: main steps, definitive shutdown, preparation of dismantling, electromechanical dismantling, cleansing/decommissioning, demolition, dismantling taken into account at the design stage, management of polluted soils; 4 - waste management: dismantlement wastes, national policy of radioactive waste management, management of dismantlement wastes; 5 - mastery of risks: risk analysis, conformability of risk management with reference documents, main risks encountered at de-construction works; 6 - regulatory procedures; 7 - international overview; 8 - conclusion. (J.S.)

  7. Long-term management of wastes resulting from dismantling operations. Storing the very low-level activity wastes at Morvilliers

    International Nuclear Information System (INIS)

    Duret, F.; Dutzer, M.; Beranger, V.; Lecoq, P.

    2003-01-01

    Extension of dismantling operations in France in the years to come poses the question of availability of long-term waste facility. Large amount of such wastes will be produced after progressive shutdown of the 58 pressurized water reactors now in operation, not before 2010. However, France is already confronted with dismantling of 9 power reactors (6 of which of gas cooled graphite type), the first reprocessing plant at Marcoule, as well as, dismantling of other installations, for instance the CEA reactors or laboratories. The systems of processing the dismantling waste are not different from those used for wastes resulting from nuclear operations. For the high-level or long-term intermediate level activity disposal the debates must start by 2006, as based on the results of the research conducted according to different provisions of the December 30, 1991 law. These wastes represent however small amounts from the dismantling (around 2000 t for the 9 reactors at shutdown) and they will be stored until a decision will be made. A specific storing system should be implemented by 2008-2010 for the graphite wastes (around 23,000 t) which contain significant amount of long-lived radioelements, although their gross activity is low. But the most significant amount will come from low-level or intermediate-level of short lifetime or from wastes of very low activity. The first category is stored at Storage Center at Aube (CSA), its capacity being of 1,000,000 m 3 of drums. The total volume stored by the end of 2002 amounted 136,500 m 3 with an annual delivering of 12-15,000 m 3 at design rate of 30,000 m 3 /y. This center will be able to absorb the flux increase resulting from dismantling of the decommissioned nuclear installations (around 50,000 t from the dismantling of the 9 power reactor). The Center at Aube can be also adapted for storing wastes of large sizes as for instance the lid of the reactor vessel. According to the French regulation, the wastes produced within a

  8. The management of radioactive wastes and the dismantling of nuclear installations in Spain

    International Nuclear Information System (INIS)

    Bouchet, Bertrand

    2014-08-01

    This report first presents the Spanish institutional framework, briefly presents the multi-year national plan of management of radioactive wastes, and indicates the origin and volume of radioactive wastes produced in Spain. It addresses the management of low and medium level wastes, the case of spent fuel and high level wastes (storage in pool and installations of temporary warehousing, project of a centralized temporary storage, the question of definitive management), and proposes an overview of R and D activities in the different domains of waste management in Spain: waste technology, technologies and processes of treatment, packaging and dismantling, materials and containment systems, behaviour and safety assessment, radiological protection and associated modelling, infrastructure and cooperation. The two last parts briefly address the funding of waste management and the dismantling of nuclear installations

  9. VOCs elimination and health risk reduction in e-waste dismantling workshop using integrated techniques of electrostatic precipitation with advanced oxidation technologies

    Energy Technology Data Exchange (ETDEWEB)

    Chen, Jiangyao [State Key Laboratory of Organic Geochemistry and Guangdong Key Laboratory of Environmental Protection and Resources Utilization, Guangzhou Institute of Geochemistry, Chinese Academy of Sciences, Guangzhou 510640 (China); Huang, Yong [State Key Laboratory of Organic Geochemistry and Guangdong Key Laboratory of Environmental Protection and Resources Utilization, Guangzhou Institute of Geochemistry, Chinese Academy of Sciences, Guangzhou 510640 (China); University of Chinese Academy of Sciences, Beijing 100049 (China); Li, Guiying [State Key Laboratory of Organic Geochemistry and Guangdong Key Laboratory of Environmental Protection and Resources Utilization, Guangzhou Institute of Geochemistry, Chinese Academy of Sciences, Guangzhou 510640 (China); An, Taicheng, E-mail: antc99@gig.ac.cn [State Key Laboratory of Organic Geochemistry and Guangdong Key Laboratory of Environmental Protection and Resources Utilization, Guangzhou Institute of Geochemistry, Chinese Academy of Sciences, Guangzhou 510640 (China); Hu, Yunkun; Li, Yunlu [Guangzhou Longest Environmental Science and Technology Co., Ltd., Guangzhou 510660 (China)

    2016-01-25

    Highlights: • Pilot-scale investigation of VOCs removal during e-waste dismantling process. • EP-PC-ozonation integrated reactor show high and stable removal ability to VOCs. • Health risks of target VOCs decrease significantly after the treatment. - Abstract: Volatile organic compounds (VOCs) emitted during the electronic waste dismantling process (EWDP) were treated at a pilot scale, using integrated electrostatic precipitation (EP)-advanced oxidation technologies (AOTs, subsequent photocatalysis (PC) and ozonation). Although no obvious alteration was seen in VOC concentration and composition, EP technology removed 47.2% of total suspended particles, greatly reducing the negative effect of particles on subsequent AOTs. After the AOT treatment, average removal efficiencies of 95.7%, 95.4%, 87.4%, and 97.5% were achieved for aromatic hydrocarbons, aliphatic hydrocarbons, halogenated hydrocarbons, as well as nitrogen- and oxygen-containing compounds, respectively, over 60-day treatment period. Furthermore, high elimination capacities were also seen using hybrid technique of PC with ozonation; this was due to the PC unit’s high loading rates and excellent pre-treatment abilities, and the ozonation unit’s high elimination capacity. In addition, the non-cancer and cancer risks, as well as the occupational exposure cancer risk, for workers exposed to emitted VOCs in workshop were reduced dramatically after the integrated technique treatment. Results demonstrated that the integrated technique led to highly efficient and stable VOC removal from EWDP emissions at a pilot scale. This study points to an efficient approach for atmospheric purification and improving human health in e-waste recycling regions.

  10. The challenges of dismantling

    International Nuclear Information System (INIS)

    Sene, Monique; Lheureux, Yves; Leroyer, Veronique; Rollinger, Francois; Gauthier, Florence; Depauw, Denis; Reynal, Nathalie; Fraysse, Thierry; Burger, Eric; Bertrand, Adrien; Vallat, Christophe; Bernet, Philippe; Eimer, Michel; Boutin, Dominique; Bietrix, Philippe; Richard, Francoise; Piketty, Laurence; Mouchet, Chantal; Charre, Jean-Pierre

    2014-01-01

    This document gathers Power Point presentations which address the contexts and challenges of dismantling (legal framework, safety and radiation protection challenges, waste processing industry), and propose illustrations of dismantling challenges (example of operations to prepare EURODIF dismantling and CLIGEET work-group on EURODIF dismantling, examples of dismantling of EDF installations and CLIs' opinion on the dismantling of EDF installations, Brennilis dismantling follow-up performed by the CLI, examples of dismantling of CEA installations and opinion of a CLI on the dismantling of CEA installations)

  11. The dismantling of nuclear installations: The dismantling of nuclear installations at the CEA's Directorate for nuclear energy; The CEA's sanitation and dismantling works: example of one of the Marcoule UP1 program lots; Research and innovation in sanitation-dismantling; Global optimisation of the management of dismantling radioactive wastes

    International Nuclear Information System (INIS)

    Hauet, Jean-Pierre; Piketty, Laurence; Moitrier, Cyril; Blanchard, Samuel; Soulabaille, Yves; Georges, Christine; Dutzer, Michel; Legee, Frederic

    2016-01-01

    This publication proposes a set of four articles which addresses issues related to the dismantling of nuclear installations in France, notably for the different involved actors such as the CEA and the ANDRA. The authors more particularly address the issue and the general strategy of dismantling within the Directorate for nuclear energy of the CEA; comment the example of one of the Marcoule UP1 program lots to highlight sanitation and dismantling works performed by the CEA; discuss current research and innovation activities within the CEA regarding sanitation and dismantling; and comment how to globally optimise the management of radioactive wastes produced by dismantling activities

  12. Nuclear cleanup and decontamination for dismantling operations

    International Nuclear Information System (INIS)

    Bargues, S.; Solignac, Y.; Lapierre, Y.

    2003-01-01

    In the May 2003 issue of the review 'Controle', the French Nuclear Safety Authority (Autorite de Surete Nucleaire or ASN) reviewed the radiation protection and waste management principles applicable to dismantling operations carried out on nuclear installations, i.e. reactors, research laboratories, fuel cycle installations and nuclear power reactors. Estelle Chapelain, of the DGSNR (French General Directorate for Nuclear Safety and Radiation Protection), pointed out that dismantling work does not involve the same radioactive risks as operating an installation. For instance, 'the risk of disseminating radioactive material is generally greater because the dismantling process supposes the removal of one or more containment barriers'. In addition to this risk of internal exposure, the possibility of external irradiation of personnel must be taken into account due to the nature of the work carried out by the operators. The probability of conventional hazards is also accentuated, these hazards varying as work progresses (fire hazards during cutting operations, hazards associated with handling tasks, etc). Other risks must also be considered: hazards due to the ageing of installations, to loss of traceability, and finally the risks associated with waste management. Waste management falls within a strict regulatory framework specified by the decree dated December 31, 1999, which makes it compulsory to carry out a 'waste survey' with the aim of producing an inventory of waste and improving waste management. These surveys include 'waste zoning' to identify those areas liable to have been contaminated. These requirements lead operators to adapt their cleanup methodology in order to distinguish suspect rooms or equipment from those that can be deemed with certainty to be conventional. In its conclusion, the safety authority recalls the importance of 'the safety and radiation protection of dismantling operations being effectively managed and optimised, without imposing

  13. Radioactive waste management, decommissioning, spent fuel storage. V. 1. Waste management principles, decommissioning, dismantling, operations in hot environment

    International Nuclear Information System (INIS)

    1985-01-01

    This book deals mainly with decommissioning problems concerning more particularly dismantling and decontamination techniques, and radioactive waste processing. Radioactive waste management in France and the French regulation are tackled. Equipments developed for works in hostile environment are also presented [fr

  14. Further studies on melting of radioactive metallic wastes from the dismantling of nuclear installations

    International Nuclear Information System (INIS)

    Diepenau, H.; Seidler, M.

    1991-01-01

    Melting of radioactive waste metal from the dismantling/refurbishing of nuclear installations is an acceptable way for nuclear waste recycling. This material can be used for the casting of qualified products such as type A- and type B-waste containers. The results of the melting facility -TAURUS- were used to build the industrial scale melting facility -CARLA- at Siempelkamp. The test results and the longterm-behaviour of the facility showed that the licensing conditions can be respected. The radiation exposure of workers was in the range of the admissible limit for non-exposed people. The radiation exposure of the environment is far below the value of the German Radiation Protection Law. The activity distribution within the product is homogeneous, so that its activity can be measured exactly before it is sent back in the nuclear area. By melting waste copper it is possible to respect the specific limits for unrestricted reuse, whereas for brass the limit for conditioned reuse in the industrial field was reached. Radioactive carbon can only be bound in form of small graphite lamellas or nodules in the cast iron; i.e. radioactive carbon can only be added to the melt as crushed material. During the research programme 2000 Mg of waste steel was melted at industrial scale and mainly products such as shielding blocks and waste containers were produced. 12 figs., 27 tabs., 6 refs

  15. Some regulation aspects in dismantling

    International Nuclear Information System (INIS)

    Niel, J.C.

    1993-01-01

    In the French regulation framework, operations linked to dismantling are controlled by an overall technical and legislative system applied to all the different stages of the facility (commissioning, etc.). Government control on facilities under dismantling is aimed at dismantling operation safety and security, and dismantling waste processing in order to ensure public and environmental protection

  16. Children with health impairments by heavy metals in an e-waste recycling area.

    Science.gov (United States)

    Zeng, Xiang; Xu, Xijin; Boezen, H Marike; Huo, Xia

    2016-04-01

    E-waste recycling has become a global environmental health issue. Pernicious chemicals escape into the environment due to informal and nonstandard e-waste recycling activities involving manual dismantling, open burning to recover heavy metals and open dumping of residual fractions. Heavy metals derived from electronic waste (e-waste), such as, lead (Pb), cadmium (Cd), chromium (Cr), manganese (Mn), nickel (Ni), mercury (Hg), arsenic (As), copper (Cu), zinc (Zn), aluminum (Al) and cobalt (Co), differ in their chemical composition, reaction properties, distribution, metabolism, excretion and biological transmission. Our previous studies showed that heavy metal exposure have adverse effects on children's health including lower birth weight, lower anogenital distance, lower Apgar scores, lower current weight, lower lung function, lower hepatitis B surface antibody levels, higher prevalence of attention-deficit/hyperactivity disorder, and higher DNA and chromosome damage. Heavy metals influence a number of diverse systems and organs, resulting in both acute and chronic effects on children's health, ranging from minor upper respiratory irritation to chronic respiratory, cardiovascular, nervous, urinary and reproductive disease, as well as aggravation of pre-existing symptoms and disease. These effects of heavy metals on children's health are briefly discussed. Copyright © 2016 Elsevier Ltd. All rights reserved.

  17. Present status of refining and conversion facility dismantling. Progress in latter half of 2010FY

    International Nuclear Information System (INIS)

    Kado, Kazumi; Sugitsue, Noritake; Morimoto, Yasuyuki; Ikegami, Sohei; Tanaka, Yoshio; Takahashi, Nobuo; Tokuyasu, Takashi

    2011-09-01

    The Refining and Conversion Facility located in the Ningyo-toge Environmental Engineering Center had the natural uranium conversion process and reprocessed uranium conversion process. The construction of this facility was started in 1979 and completed in October 1981. Dismantling of equipments in radiation controlled area of this facility was started from 2008. Equipments in radiation controlled area (excluding ventilating equipment and liquid waste treatment equipment) will be dismantled by the 2011 fiscal year, and ventilating equipment and liquid waste treatment equipment will be dismantled by the 2014 fiscal year. This report describes the master plan of this decommissioning and shows as the progress in latter half year of 2010FY, the actual time schedule, the method of decommissioning, the decommissioning progress appearance with photographs, work rates of each room / each worker class, and the quantity of dismantled materials and secondary wastes. (author)

  18. Systematic characterization of generation and management of e-waste in China.

    Science.gov (United States)

    Duan, Huabo; Hu, Jiukun; Tan, Quanyin; Liu, Lili; Wang, Yanjie; Li, Jinhui

    2016-01-01

    Over the last decade, there has been much effort to promote the management of e-waste in China. Policies have been affected to prohibit imports and to control pollution. Research has been conducted in laboratories and on large-scale industrial operations. A subsidy system to support sound e-waste recycling has been put in place. However, the handling of e-waste is still a concern in China and the issue remains unresolved. There has been relatively little work to follow up this issue or to interpret continuing problems from the perspective of sustainable development. This paper first provides a brief overview of conventional and emerging environmental pollution in Chinese "famous" e-waste dismantling areas, including Guiyu in Guangdong and Wenling in Zhejiang. Environmentalists have repeatedly proven that these areas are significantly polluted. Importing and backyard recycling are decreasing but are ongoing. Most importantly, no work is being done to treat or remediate the contaminated environmental media. The situation is exacerbated by the rising tide of e-waste generated by domestic update of various electronics. This study, therefore, employs a Sales Obsolescence Model approach to predict the generation of e-waste. When accounting for weight, approximately 8 million tons of e-waste will be generated domestically in 2015, of which around 50% is ferrous metals, followed by miscellaneous plastic (30%), copper metal and cables (8%), aluminum (5%), and others (7%). Of this, 3.6% will come from scrap PCBs and 0.2% from lead CRT glass. While more and more end-of-life electronics have been collected and treated by formal or licensed recyclers in China in terms of our analysis, many of them only have dismantling and separation activities. Hazardous e-wastes, including those from PCBs, CRT glass, and brominated flame retardant (BFR) plastics, have become problematic and probably flow to small or backyard recyclers without environmentally sound management. Traditional

  19. National School of Dismantling

    International Nuclear Information System (INIS)

    Ivaldi, Fabienne

    2003-01-01

    The National Institut of Nuclear Sciences and Techniques founded of 2001 a National School of Dismantling, NSD, at the end, which was validated by CEA, COGEMA, EDF and ANDRA. This school addresses four major issues: Decontamination; Dismantling; Demolition and waste Disposal (4D). Dedicated for instructing scientific and technical knowledge and know-how, needed in dismantling the nuclear installations, NSD has as targets: - personnel at engineering and operational level; - personnel occupied with involved trades from conception through intervention; - students and employees on leave; - employees while training on the job. Initial basic education for students in collaboration with schools and universities concerns: - master degree in radioactive waste management; - master degree in dismantling; - professional license in 3 D; - pro 4 D graduation. NSD is also engaged in continual formation for employees qualified, or not, adapted to the needs generated by the following tasks and personnel: - introduction in dismantling; - project team; - specialist engineer; - team head; - agent for remedial action; - agent for dismantling. The National School of Dismantling joins a network of human and technological capabilities confined within the 4 D frame, namely: - scientific and technical competencies (experts, instructors working in the nuclear field and dismantling); - pedagogical competence (professionals from basic and continual education); - specific material means such as those used by construction site schools, mock-ups, rooms for practical training etc

  20. Clean-up and dismantling, Dismantling - legacy of the past, prospects for the future: CEA, a pioneer in the dismantling process, nuclear dismantling, research and innovation dedicated to dismantling

    International Nuclear Information System (INIS)

    Lorec, Amelie

    2016-01-01

    France - a world leader in the whole nuclear power cycle - is also responsible for the clean-up and dismantling of its end-of-life nuclear facilities. Here, the CEA is considered to be a pioneer both in the project ownership of work sites and in the R and D for optimising the timescales, costs and safety of those work sites. Its responsibilities range from defining the most appropriate scenario, characterising the radiological state of equipment and decontaminating premises, carrying out dismantling and optimising the resulting waste. With this wide range of skills and the diversity of its facilities, the CEA Nuclear Energy Division is developing innovative solutions which are already the subject of industrial transfers. Two-thirds of France's end-of-life nuclear facilities belong to the CEA - a situation connected with its history. This implies setting up clean-up and dismantling work sites which have unprecedented scientific, human and financial challenges. Every regulated nuclear installation (INB) (nuclear reactors, laboratories, etc.) has a limited operating life. When it stops being used, it is first cleaned up (removal of radioactive substances), then dismantled (disassembly of components) in accordance with the baseline safety requirements, and finally decommissioned so that it can be used for other purposes or be demolished. Cleanup and dismantling operations concern all the facility's components, such as hot (shielded) cells which can be found in some laboratories. As the owner of its clean-up and dismantling projects, the CEA also devotes a significant amount of R and D to reducing the timescales, costs and waste from current and future programmes, while improving their safety. The resulting innovations often lead to industrial transfers. (authors)

  1. The nuclear installations dismantling and the management of radioactive wastes; Le demantelement des installations nucleaires et la gestion des dechets radioactifs

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-01-15

    As other industrial activities, the nuclear industry causes risks. The risks bound to the dismantling operations are known and controlled. After a presentation of the dismantling and radioactive wastes challenge, this document proposes recommendations based on the first experiences of dismantling and wastes storage. It aims then to answer to the questions relative to the cost and the financing of the operations. Finally it wonders on the public information modalities. (A.L.B.)

  2. Development for recycle of dismantled metal wastes by decommissioning of NPP

    International Nuclear Information System (INIS)

    Asami, Tomohiro; Sato, Hiroshi; Hatakeyama, Mutsuo

    2007-01-01

    For recycle of dismantled metal wastes generated by the decommissioning of nuclear power plant, we examined a melting test for melting characterization of stainless steel scrap, designed the conceptual process to produce the recycle products, and developed a recycle cost evaluation code which is useful to make a rational planning for the waste management program (cost, determination of process, etc.) of these metal wastes. This report gives the summary of these development carried out from 2001 to 2005. This work was performed under the sponsorship of Ministry of Education, Culture, Sports, Science and Technology of Japan. (author)

  3. E-waste interventions in Ghana.

    Science.gov (United States)

    Asante, Kwadwo Ansong; Pwamang, John A; Amoyaw-Osei, Yaw; Ampofo, Joseph Addo

    2016-03-01

    Electrical and electronic waste (e-waste) has become an emerging environmental and human health problem in the world in the 21st century. Recently, the developing nations of West Africa (e.g. Ghana and Nigeria) have become a major destination for e-waste worldwide. In Ghana, the e-waste recyclers use primitive methods (mechanical shredding and open burning) to remove plastic insulation from copper cables. This technique can release highly toxic chemicals and severely affect the environment and human health if improperly managed. It is as a result of the adverse impact on human health that some interventions are being made in Ghana to reduce exposure. The present mode of recycling/dismantling, which happens at Agbogbloshie must be replaced by official receiving/recycling centers to be established. Currently, equipment to strip both large and small cables are available in the country via the Blacksmith Institute (USA) and it is expected that the e-waste workers will embrace the use of these machines. This technology will go a long way to help prevent the burning of e-waste and will be replicated in other smaller e-waste centers in the country.

  4. Multiparameter optimisation of dismantling activities and waste management at a research centre

    International Nuclear Information System (INIS)

    Andres, Roger

    2001-01-01

    investing now (e.g. for reduction of waste volume) in order to safe costs decades in the future (transfer into a final repository) must be significant, and must be forcefully communicated. Technical issues: The materials used in research vary widely. The irradiation conditions are very complex: different partides (protons, neutrons), different spectra (thermal to high energy), etc. Strong gradients of irradiation conditions can lead to unexpected local hot spots with very high dose rates and radionuclide content. The strong radiation fields and the long irradiation periods may result in unexpected activation products from additives and impurities in the bulk materials. The required flexibility of use of materials, instruments and areas results in incomplete lifetime documentation of components. From this brief and incomplete listing it can easily be concluded, that the task of the decommissioning crew at PSI necessitates the constant optimisation of many parameters. The actual work is performed in the Division for Radiation Protection, Security and Waste Management, and is closely and constantly coordinated with the top management of the institute. Procedures; Several organisational, scientific and operational processes have been implemented to facilitate this task. They are amongst others: Standing committees regularly meet with the major producer of waste (one for the nuclear installation, and one for the accelerator complex). A representative of the division is present in all technical planning sessions for new experiments. A comprehensive data bank is kept, listing all waste - and the current status of it's treatment - under the responsibility of the division. A novel computational modelling system for the prospective and retrospective calculation of nuclide inventories in both reactor and accelerator waste is developed. Periodic meetings are held with the regulatory authorities outside the institute, in order to anticipate and remove regulatory hurdles to the process

  5. In-situ dismantling of plutonium-contaminated glove box

    International Nuclear Information System (INIS)

    Numata, Koji; Watanabe, Hisashi; Ishikawa, Hisashi; Miyo, Hiroaki; Ohtsuka, Katsuyuki

    1980-01-01

    A plutonium-contaminated glove box was dismantled along with the development of the treatment techniques for plutonium-bearing wastes. The objectives of this in-situ dismantling of the glove box are to reuse the Plutonium Fuel Fabrication Facility more efficiently, to reduce the volume of wastes generated during the dismantling, and to acquire dismantling techniques for decommissioning the Plutonium Fuel Fabrication Facility in the future. Prior to the dismantling works, a greenhouse for decontamination was installed, and the decontamination with surfactants was performed. Unremovable contamination was coated with paint. After this greenhouse was removed, the main greenhouse for dismantling and three greenhouses for contamination control were assembled. The main workers wearing protective devices engaged in dismantling works in the greenhouse. As the protective devices, anorak type PVC suits with air line masks, Howell type pressurized suits, and respirators were used. The tools used for the dismantling are a plasma cutter, an electric nibbler, an electric disk grinder, an electric circular saw and an electric jig saw. The results of the dismantling in-situ were compared with two previous cases of dismantling carried out by different procedures. In the case of in-situ dismantling, the volume of wastes was 1.6 - 1.8 m 3 /m 3 of glove box, and considerable reduction was realized. (Kako, I.)

  6. Management of wastes from dismantled nuclear power plants

    International Nuclear Information System (INIS)

    1979-01-01

    The problems associated with the management of radioactive wastes encountered in the dismantling of a 1200MWe PWR reactor are considered. It is possible to extend all the conclusions reached in these studies to BWR's or other reactors of the same type using light water as a coolant and moderator. The studies performed established the specific characteristics of these wastes: a gamma activity due essentially to 60 Co (after some fifty years this radioisotope will have decayed sufficiently to enable it to be stored without shielding); the presence of 63 Ni and 59 Ni (these long half-life beta emitting radioisotopes need to be stored over a long or even indefinite period of time); contaminated components (60% of the overall wastes), the reselling of these components involving costly decontamination processes. Extensive studies have been conducted on the management and handling of these wastes: packaging, transport, processing, storage and a great many techniques have been developed. However, further developments in concentration methods (fusion, crushing, cryogenics etc) and the selection of storage sites for this type of waste are necessary. Depending on the solutions chosen, the global cost of the wastes coming from a 1200 MW PWR reactor can vary between 10 and 20 million BFR

  7. Lessons learned. Optimization of the plant structure at the beginning of the dismantling process

    International Nuclear Information System (INIS)

    Sesterhenn, Kurt

    2008-01-01

    The processes of shutdown and dismantling of the NPP Muehlheim-Kaerlich included several steps: conservation operation including fuel element removal, decontamination and radiological characterization, conservation of components that may still be used, removal and disposal of operating supply items, preparation of concepts for the dismantling process and realization of dismantling. The authors describe in detail the safety concept, the waste tracking program, the operational organization and reduction of area subject to radiological surveillance during the dismantling and renaturation project.

  8. Dismantling of nuclear facilities

    International Nuclear Information System (INIS)

    Tallec, Michele; Kus, Jean-Pierre; Mogavero, Robert; Genelot, Gabriel

    2009-01-01

    Although the operational life of nuclear plants is long (around 60 years for French reactors) it is nonetheless limited in time, the stopping of it being essentially due to the obsolescence of materials and processes or to economic or safety considerations. The nuclear power plants are then subjected to cleanup and dismantling operations which have different objectives and require specific techniques. The cleanup and/or dismantling of a nuclear power produces significant quantities of waste which is generally of a different nature to that produced during the operation of the concerned plant. The radioactive waste produced by these operations is destined to be sent to the waste disposal facilities of the French National Agency for the Management of Nuclear Waste. (authors)

  9. Cleansing and dismantling of CEA-Saclay nuclear licensed facilities

    International Nuclear Information System (INIS)

    Jeanjacques, Michel; Delaire, Isabelle; Glevarec, Rebecca; Mandard, Lionel; Martin, Jean-Louis; Serrano, Roger

    2013-01-01

    This summary presents the cleansing and dismantling operations currently realized on the CEA center of Saclay (CEA-Saclay). It was initiated at the beginning of the 2000 years a cleansing and dismantling program of the old Nuclear Licensed Facilities (NLF). Currently this program relates the dismantling operations to the Hot Laboratories (Laboratoires de Haute Activite: LHA) and the old workshops of the Liquid Waste Treatment Plant (Station des Effluents Liquides: STEL), the dismantling preparation of Ulysse reactor and the dismantling studies to the Solid Waste Management Plant (SWMP; Zone de Gestion des Dechets Solides) and the Osiris reactor. (authors)

  10. The timing of reactor dismantling

    International Nuclear Information System (INIS)

    Roberts, P.

    2000-01-01

    Work has been progressing across the world for the decommissioning of nuclear reactors. The initial work focused on the early, complete dismantling but this was associated with small size reactors and was done for experimental or demonstration purposes. The situation now is that an increasing number of full size power reactors are being shutdown and decision are being made as to the decommissioning strategy to be applied, e.g. with respect to the appropriate timing of reactor dismantling. There are two basic approaches to the timing of reactor dismantling, which are to either proceed with dismantling on an early time scale or to delay it for a period of years. There are a number of examples worldwide of both approaches being taken but one common feature of the approach taken by most countries is that decisions are made on a case by case basis, taking account of relevant factors, and as a result the strategy can vary from reactor to reactor and from country to country. Decisions on timing take account of the following main factors: safety, radioactive decay, financial factors, radioactive waste, reactor type, technology, repository availability, site re-use, regulatory standards, plant knowledge/records, other issues

  11. Dismantling of nuclear facilities and related problems - Conference proceedings

    International Nuclear Information System (INIS)

    Tournebize, Frederic; Bordet, Didier; Charlety, Philippe; Gore, Thierry; Estrade, Jerome; Lemaire, Hermine; Ginet, Annick; Fabrier, Lionel; Evrard, Lydie; Furois, Timothee; Butez, Marc; Dutzer, Michel; Faure, Vincent; Billarand, Yann; Menuet, Lise; Lahaye, Thierry; Pin, Alain; Mougnard, Philippe; Charavy, Sylvain; Poncet, Philippe; Moggia, Fabrice; Dochy, Arnaud; Benjamin, Patrick; Poncet, Pierre-Emmanuel; Beneteau, Yannick; Richard, Jean-Baptiste; Pellenz, Gilles; Ollivier Dehaye, Catherine; Gerard, Stephane; Denissen, Luc; Davain, Henri; Duveau, Florent; Guyot, Jean-Luc; Ardellier, Luc

    2012-11-01

    The oldest French nuclear facilities, built for some of them in the 1950's for research or power generation purposes, have reached more or less the end of their life. More than 30 facilities have entered the shutdown or dismantling phase, among which 8 reactors of the very first generations of Electricite de France (EdF) reactors. The aim of this two-days conference is to take stock of the present day status and perspectives of the dismantling activity, to approach the question of the management of the wastes produced, and to share experience about large scale operations already carried out. This document gathers the available presentations given during this conference: 1 - the 'Passage' project (F. Tournebize); 2 - CEA-Grenoble: from Louis Neel to key enabling technologies (D. Bordet); 3 - Dismantling actions in France (L. Evrard); 4 - Securing control of long-term charges funding (T. Furois); 5 - Waste disposal projects and their contribution to the management of dismantling wastes (M. Butez); 6 - Specificities linked with dismantling activities (Y. Billarand); 7 - Dismantling safety: the ASN's point of view (L. Evrad); 8 - Labor Ministry viewpoint about the dismantling related questions (T. Lahaye); 9 - Consideration of organizational and human factors in dismantling operations: a new deal in the operators-service providers relation (L. Menuet); 10 - Diploma and training experience (A. Pin); 11 - Glove-boxes dismantling at La Hague plant - status and experience feedback (P. Mougnard); 12 - Dismantling of Siloe reactor (CEA-Grenoble): application of the ALARA approach (P. Charlety); 13 - BR3 - a complex dismantling: the neutron shield tank (NST) in remote operation and indirect vision (L. Denissen); 14 - Cleansing and dismantling of the Phebus PF containment (S. Charavy); 15 - Integration of dismantling at the design and exploitation stages of nuclear facilities (P. Poncet); 16 - Consideration during the design and exploitation stages of dispositions aiming at

  12. Calculation of external exposure during transport and disposal of radioactive waste arisen from dismantling of steam generator

    International Nuclear Information System (INIS)

    Hornacek, M.; Necas, V.

    2014-01-01

    The dismantling of large components (reactor pressure vessel, reactor internals, steam generator) represents complex of processes involving preparation, dismantling, waste treatment and conditioning, transport and final disposal. To optimise all of these activities in accordance with the ALARA principle the prediction of the exposure of workers is an essential prerequisite. The paper deals with the calculation of external exposure of workers during transport and final disposal of heat exchange tubes of steam generator used in Slovak nuclear power plant V1 in Jaslovske Bohunice. The type of waste packages, the calculation models of truck and National Radioactive Waste Repository in Mochovce are presented. The detailed methodology of radioactive waste disposal is showed and the degree of influence of time decay (0, 5 and 10 years) on the radiological conditions during transport and disposal is studied. All of the results do not exceed the limits given in Slovak and international regulatory documents. (authors)

  13. Dismantling of transuranic contaminated facilities

    International Nuclear Information System (INIS)

    Roux, P.

    1985-01-01

    The dismantling of transuranic contaminated facilities raises specific problems. A large part of these problems relates to the management of the waste resulting from dismantling. From the experience gained in the different centers CEA and COGEMA it appears that there are industrial solutions in the group CEA and that an engineering company such as SGN can export them [fr

  14. Study on safety evaluation for unrestricted recycling criteria of radioactive waste from dismantling operation

    International Nuclear Information System (INIS)

    Yoshimori, Michiro; Ohkoshi, Minoru; Abe, Masayoshi

    1995-01-01

    The study on safety evaluation was done, under contracting with the Science and Technology Agency, for recycling scrap metal arising from dismantling of reactor facilities. An object of this study is to contribute to the examination of establishing criteria and safety regulation for unrestricted recycling steel scrap. To define amount of market flow of iron material in Japan and the amount of radioactive waste generated from dismantling of reactor facilities, investigation had been carried out. On basis of these investigation results and data in several literature, individual doses to workers and to the members of the public have been calculated as well as collective doses. (author)

  15. Remotely-Controlled Shear for Dismantling Highly Radioactive Tools In Rokkasho Vitrification Facility - 12204

    Energy Technology Data Exchange (ETDEWEB)

    Mitsui, Takashi; Sawa, Shusuke; Sadaki, Akira; Awano, Toshihiko [IHI Corporation, 1 Shin-Nakahara-cho, Isogo-ku, Yokohama, Kanagawa (Japan); Cole, Matt [S.A. Technology Inc, 3985 S. Lincoln Ave., Ste. 100, Loveland CO 80537 (United States); Miura, Yasuhiko; Ino, Tooru [Japan Nuclear Fuel Limited, 4-108, Aza Okitsuke, Oaza Obuchi, Rokkasho-Mura, Kamikita-gun, Aomori (Japan)

    2012-07-01

    A high-level liquid waste vitrification facility in the Japanese Rokkasho Reprocessing Plant (RRP) is right in the middle of hot commissioning tests toward starting operation in fall of 2012. In these tests, various tools were applied to address issues occurring in the vitrification cell. Because of these tools' unplanned placement in the cell it has been necessary to dismantle and dispose of them promptly. One of the tools requiring removal is a rod used in the glass melter to improve glass pouring. It is composed of a long rod made of Inconel 601 or 625 and has been highly contaminated. In order to dismantle these tools and to remotely put them in a designated waste basket, a custom electric shear machine was developed. It was installed in a dismantling area of the vitrification cell by remote cranes and manipulators and has been successfully operated. It can be remotely dismantled and placed in a waste basket for interim storage. This is a very good example of a successful deployment of a specialty remote tool in a hot cell environment. This paper also highlights how commissioning and operations are done in the Japanese Rokkasho Reprocessing Plant. (authors)

  16. The dismantling of CEA nuclear installations

    International Nuclear Information System (INIS)

    Piketty, Laurence

    2016-03-01

    After having indicated locations of French nuclear installations which are currently being dismantled (about 30 installations), and recalled the different categories of radioactive wastes with respect to their activity level and the associated storage options, this article gives an overview of various aspects of dismantling, more precisely in the case of installations owned and managed by the CEA. These operations comprise the dismantling itself, the recovery and packaging of wastes, old effluents and spent fuels. The organisation and responsible departments within the CEA are presented, and the author outlines some operational problematic issues met due to the age of installations (traceability of activities, regulation evolutions). The issue of financing is then discussed, and its uncertainties are outlined. The dismantling strategy within the CEA-DEN is described, with reference to legal and regulatory frameworks. The next parts of the article address the organisation and the economic impact of these decontamination and dismantling activities within the CEA-DEN, highlight how R and D and advanced technology are a support to this activities as R and D actions address all scientific and technical fields of nuclear decontamination and dismantling. An overview of three important dismantling works is proposed: Fontenay-aux-Roses, the Marcoule CEA centre (a reference centre in the field of nuclear dismantling and decontamination) and the Grenoble CEA centre (reconversion in R and D activities in the fields of technologies of information, of communication, technologies, for health, and in renewable energies). The last part addresses the participation to the Strategic Committee of the Nuclear Sector (CSFN)

  17. Nuclear installations: decommissioning and dismantling

    International Nuclear Information System (INIS)

    Anon.

    1995-01-01

    This document is a compilation of seven talks given during the 1995 EUROFORUM conference about decommissioning and dismantling of Nuclear installations in the European Community. The first two papers give a detailed description of the legal, financial and regulatory framework of decommissioning and dismantling of nuclear facilities in the European Union and a review of the currently available decommissioning techniques for inventory, disassembly, decontamination, remote operations and management of wastes. Other papers describe some legal and technical aspects of reactor and plants dismantling in UK, Germany, Spain and France. (J.S.)

  18. Processing of LLW arising from dismantling activities in a reprocessing facility

    International Nuclear Information System (INIS)

    Geens, L.G.; Geens, L.P.; Vandeven, I.

    1990-01-01

    The Eurochemic reprocessing facility, at the Mol-Dessel site in Belgium was in active operation from July 1966 until January 1975. In total, about 210 Mg of various types of irradiated nuclear fuels were processed. After the shut-down the plant has been partially decontaminated in view of recommissioning. When the recommissioning option was abandoned, the decision was taken in 1986 to dismantle the plant. A 2 years study resulted in the start of a pilot project: the dismantling of two smaller buildings, previously used for storage of uranyl nitrate and used solvent. The minimization of radioactive waste generation was also one of the major goals of this project. The report deals with the different steps in the minimization of radioactive waste generation during the dismantling activities. First, an estimation of the amounts of radioactive waste, expected to be generated, was made. In a second step the actual waste production during dismantling operations was minimized and compared with the estimations. Finally, a large part of the primary radioactive dismantling waste has been completely decontaminated, resulting in much lower amounts of nuclear waste generated. 2 refs., 3 figs., 2 tabs

  19. Preliminary dismantling for the decommissioning of nuclear licensed facilities at the CEA Centre in Fontenay aux Roses

    International Nuclear Information System (INIS)

    Estivie, D.; Bohar, M.P.; Jeanjacques, M.; Binet, C.

    2008-01-01

    Under the perimeter modification programme for the Nuclear Licensed Facilities (NLFs) of the French Atomic Energy Commission centre at Fontenay aux Roses (CEN-FAR), preliminary dismantling work proved necessary to decommission the buildings outside the nuclear perimeter and create interim storage areas for waste packages. This summary describes the dismantling of Buildings 07, 53 and 91/54, which are the most representative of the preliminary dismantling work. (author)

  20. The dismantling of nuclear installations

    International Nuclear Information System (INIS)

    Lacoste, A.C.; Duthe, M.; Mignon, H.; Lambert, F.; Pradel, Ph.; Hillewaere, J.P.; Dupre la Tour, St.; Mandil, C.; Weil, L.; Eickelpasch, N.; Finsterwalder, L.

    1997-01-01

    for nuclear installations, the dismantling is an important part of their exploitation. The technology of dismantling is existing and to get a benefit from the radioactive decay, it seems more easy for operating company such E.D.F. to wait for fifty years before dismantling. But in order to get the knowledge of this operation, the Safety Authority wanted to devote this issue of 'Controle'to the dismantling method. This issue includes: the legal aspects, the risks assessment, the dismantling policy at E.D.F., the site of Brennilis (first French experience of dismantling), the dismantling techniques, the first dismantling of a fuel reprocessing plant, comparison with classical installations, economic aspect, some German experiences, the cleansing of the american site of Handford. (N.C.)

  1. Chooz A, First Pressurized Water Reactor to be Dismantled in France - 13445

    Energy Technology Data Exchange (ETDEWEB)

    Boucau, Joseph [Westinghouse Electric Company, 43 rue de l' Industrie, Nivelles (Belgium); Mirabella, C. [Westinghouse Electric France, Orsay (France); Nilsson, Lennart [Westinghouse Electric Sweden, Vaesteraas (Sweden); Kreitman, Paul J. [Westinghouse Electric Company, Lake Bluff, IL 60048 (United States); Obert, Estelle [EDF - DPI - CIDEN, Lyon (France)

    2013-07-01

    Nine commercial nuclear power plants have been permanently shut down in France to date, of which the Chooz A plant underwent an extensive decommissioning and dismantling program. Chooz Nuclear Power Station is located in the municipality of Chooz, Ardennes region, in the northeast part of France. Chooz B1 and B2 are 1,500 megawatt electric (MWe) pressurized water reactors (PWRs) currently in operation. Chooz A, a 305 MWe PWR implanted in two caves within a hill, began operations in 1967 and closed in 1991, and will now become the first PWR in France to be fully dismantled. EDF CIDEN (Engineering Center for Dismantling and Environment) has awarded Westinghouse a contract for the dismantling of its Chooz A reactor vessel (RV). The project began in January 2010. Westinghouse is leading the project in a consortium with Nuvia France. The project scope includes overall project management, conditioning of the reactor vessel (RV) head, RV and RV internals segmentation, reactor nozzle cutting for lifting the RV out of the pit and seal it afterwards, dismantling of the RV thermal insulation, ALARA (As Low As Reasonably Achievable) forecast to ensure acceptable doses for the personnel, complementary vacuum cleaner to catch the chips during the segmentation work, needs and facilities, waste characterization and packaging, civil work modifications, licensing documentation. The RV and RV internals will be segmented based on the mechanical cutting technology that Westinghouse applied successfully for more than 13 years. The segmentation activities cover the cutting and packaging plan, tooling design and qualification, personnel training and site implementation. Since Chooz A is located inside two caves, the project will involve waste transportation from the reactor cave through long galleries to the waste buffer area. The project will end after the entire dismantling work is completed, and the waste storage is outside the caves and ready to be shipped either to the ANDRA (French

  2. The promising opportunity of dismantlement

    International Nuclear Information System (INIS)

    Anon.

    2009-01-01

    Civil engineering, mechanics and waste conditioning companies are thriving around the market of nuclear facilities dismantlement which is promised to a huge development in the coming decade. This paper presents a map of the opportunities of the dismantlement market throughout Europe (research and power reactors, fuel fabrication plants, spent fuel reprocessing plants) and a cost estimation of a given dismantling work with respect to the different steps of the work. In France a small core of about twenty companies is involved in nuclear dismantlement but the French market is also looking towards foreign specialists of this activity. The British market is also targeted by the French companies but for all the actors the technological or commercial advance gained today will be determining for the future markets. (J.S.)

  3. Definition of a dismantling project

    International Nuclear Information System (INIS)

    Meyers, H.; Claes, J.; Geens, L.

    1988-01-01

    The shutdown of the fuel reprocessing plant of Eurochemic having been decided, a study for defining the facilities to be dismantled and how to do it, was conducted by Belgoprocess. The cost of the operation was estimated by an accurate investigation and by a pilot project on the dismantling of the wastes storage building. The work carried out up to now and the problems to be solved are summarized [fr

  4. Reactor vessel dismantling at the high flux materials testing reactor Petten

    International Nuclear Information System (INIS)

    Tas, A.; Teunissen, G.

    1986-01-01

    The project of replacing the reactor vessel of the high flux materials testing reactor (HFR) originated in 1974 when results of several research programs confirmed severe neutron embrittlement of aluminium alloys suggesting a limited life of the existing facility. This report describes the dismantling philosophy and organisation, the design of special underwater equipment, the dismantling of the reactor vessel and thermal column, and the conditioning and shielding activities resulting in a working area for the installation of the new vessel with no access limitations due to radiation. Finally an overview of the segmentation, waste disposal and radiation exposure is given. The total dismantling, segmentation and conditioning activities resulted in a total collective radiation dose of 300 mSv. (orig.) [de

  5. Technical report on dismantling of incinerator building of JNC with strict environmental assessments especially for the contamination of surroundings of incinerator by Dioxin's in soil

    International Nuclear Information System (INIS)

    Aizawa, Masanori; Ohmori, Koji; Nomura, Takeshi; Numano, Tatuo; Usui, Kazuya; Irinouchi, Shigenori

    2003-03-01

    Building of incinerator for general waste located at Tokai of Japan Nuclear Cycle Development Institute (JNC in short) were dismantled form April 2002 to March 2003 under environmental control According to the regulation entitled 'Outline for the prevention of exposure of Dioxin's to operators engaged in dismantling of waste incinerator' issued on June 01, 2000 by Ministry of Health, Labor and Welfare in Japan, the regulation requests proper protection methodology to dismantling the incinerator and surroundings contaminated by Dioxin's. This report consists of Environmental assessment under Japanese law and regulations and Procedure of actual dismantling of incinerator building with law-abiding stand point. 1. Environmental assessment; Survey of several laws and regulations concerning on the Dioxin's and actual site assessment to analyze the content of Dioxin's for surroundings of incinerator building. Ground design of dismantling procedures, waste management for disposed during dismantling and scheduling for dismantling of building. 2. Dismantling procedures; Prior to dismantling operation, contamination map by Dioxin's were established then restricted areas were determined. Protection methodology to dioxin's exposure for operators were selected and started dismantling operation after getting permission from the Labor Standards Bureau of Ibaraki Prefecture. Dismantling operations were carried out with respect o above mentioned regulations to prevent the operators exposure to Dioxin's if they are exists in soil or surroundings of building. Finally, dismantling operations were completed without accidents and confirmed no-exposure of Dioxin's to operators of dismantling. Waste generated during dismantling were recycled using specialized recycling companies in Ibaraki prefecture. Dismantling operation of incinerator was first experience at Ibaraki Prefecture, so the officials of Labor Standards Bureau were carried out on-the-spot inspection and have no claim from

  6. The WAK decommissioning and dismantling program

    International Nuclear Information System (INIS)

    Eiben, K.; Fritz, P.

    1995-01-01

    After an extensive rinsing of the reprocessing equipment the operation in the plant was terminated in 1991 following the principal political decision to abolish reprocessing of nuclear fuel in Germany. Since July 1991 only the safety relevant units are still in operation including the waste storage facilities for 80 m 3 of high active waste concentrate (HAWC). The decommissioning and dismantling will be achieved in six steps taking into account that some of the reprocessing equipment can be dismantled before and the rest only after the HAWC has been vitrified approximately by mid 2000. So far two licenses for decommissioning have been granted. An application for the dismantling of twelve systems in the process building including headend and tailend facilities will be licensed in 1995. The remote dismantling of equipment from the hot cells in the process building is being planned and will be executed between 1998--2001. New remote handling equipment will be cold tested in a test facility scheduled to start in the middle of this year. The final task is the green meadow after demolishing of the building and remediation of the site which is scheduled for 2005

  7. Heavy metals and organic compounds contamination in soil from an e-waste region in South China.

    Science.gov (United States)

    Liu, Ming; Huang, Bo; Bi, Xinhui; Ren, Zhaofang; Sheng, Guoying; Fu, Jiamo

    2013-05-01

    Heavy metals and persistent organic pollutants polychlorinated biphenyls (PCBs) and polybrominated diphenyl ethers (PBDEs) were analyzed in 34 surface soil samples collected from farmland and 7 soil or dust samples collected from the workshops in South China, where e-waste was dismantled using primitive techniques. The results show that Cd, Cu and Hg were the most abundant metals, in particular Cd pollution was serious in farmland soils, and the median concentrations in farmland soils were beyond the environmental quality standard for soils (China Grade II). A correlation between Cd, Cu, Zn, Pb and PCBs or PBDEs was significant indicating similar sources. Among the PCB congeners, high relative similarity was observed between the e-waste dump site soil (EW1) and Aroclor 1254, implying that the technical product Aroclor 1254 was one of the major sources of PCB contamination. High concentrations of PCBs in workshop dusts (D2 and D3) (1958 and 1675 μg kg(-1)) demonstrated that the workshops dismantling electrical wires and cables, electrical motors, compressors and aluminum apparatus containing PCBs in lubricants represent strong PCB emission sources to this area. Principal component analysis (PCA) and PBDE homologue patterns verify that farmland soils surrounding the e-waste recycling sites were enriched with lower brominated congeners, and the major source of PBDEs in dust samples might potentially be associated with the extensive use of deca-mix technical products as a flame retardant. The difference between e-waste soils, dusts and farmland soils can be observed in the PCA score plot of PCBs and PBDEs, and E-waste soils and dusts exhibited more diversity than farmland soils. Furthermore, a prediction of the particular kinds of pollution from different recycling activities through the analysis of each contamination and the connections between them was investigated.

  8. Radiation exposure estimates on production and utilization of recycled items using dismantling waste

    International Nuclear Information System (INIS)

    Nakamura, Hisashi; Nakashima, Mikio

    2002-03-01

    Radiation exposure was estimated on production and utilization of recycled items using dismantling wastes by assuming that their usage are restricted to nuclear facilities. The radiation exposure attributed to production of a steel-plate cast iron waste container, a receptacle for slag, and a drum reinforcement was calculated to be in the range of several μSv to several tens of μSv even in recycling contaminated metal waste of which radioactivity concentration of Co-60 is higher than the clearance level by a factor of two figures. It is also elucidated that casting of a multiple casting waste package meets the standards of dose equivalent rate for the transport of a radioactive package and the weight of the package will be able to kept around 20 tons for the convenience of the handling, in case of disposal of metal waste less than 37 MBq/g with the steel-plate cast iron waste container. As the results, from the radiological exposure's point of view, it should be possible to use slightly contaminated metal for recycled items in waste management. (author)

  9. Advanced robotics for decontamination and dismantlement

    International Nuclear Information System (INIS)

    Hamel, W.R.; Haley, D.C.

    1994-01-01

    The decontamination and dismantlement (D ampersand D) robotics technology application area of the US Department of Energy's Robotics Technology Development Program is explained and described. D ampersand D robotic systems show real promise for the reduction of human exposure to hazards, for improvement of productivity, and for the reduction of secondary waste generation. Current research and development pertaining to automated floor characterization, robotic equipment removal, and special inspection is summarized. Future research directions for these and emerging activities is given

  10. Dismantling without contaminating: The EUREX plant experience

    International Nuclear Information System (INIS)

    2001-01-01

    The EUREX pilot plant of ENEA Research Centre of Saluggia (Italy) reprocessed, between 1970 and 1983, some 600 elements and 1.5 tonnes of irradiated fuel from MTR and CANDU reactors. The general programme of denuclearization of the site actually focuses on the main priority of the conditioning of the about 400 m 3 of High and Low Level Liquid wastes stored in Saluggia. For this reason, in 1997 a project for the H and LLW conditioning, named 'CORA' has started. The 'CORA' unit will solidify the liquid wastes applying the Cold Crucible Melter (CCM) technology; due to the low volume amount of wastes to vitrify, the 'CORA' project has been accurately tailored in order to reduce social impact on public acceptance, costs and conditioning plant volumes to dismantle at the end of the work. For this reason, all the main nuclear components of the conditioning unit (input tank and pretreatment section, CC Melter, pot handling, off-gas system, interim glass storage) will be hosted inside four existing cells of the EUREX plant, duly dismantled. The EUREX plant services (electric and process fluid supplies, controlled areas, ventilation system...) will be reused too, revamped in some cases. The reuse of a nuclear plant which was built in the 60's, as the EUREX is, for future conditioning activities to be 'transplanted' there in the next years, it is not quite an easy job: the partial EUREX dismantling must permit an easy recovery of process areas and spread of contamination from old components (tanks, pipes, valves...) has to be minimized as far as possible. In order to minimize contamination spread, pipe cutting is made by a hydraulic shear, leaving the cut edges closed. Size reduction of pipes and tanks, to optimize the 5 m 3 steel storage containers filling is, as far as possible, made out of the working area of the cells. To achieve this goal a preliminary sketch of pipes to be cut and where the minimal cuts ought to be done is prepared before each intervention. The time

  11. Present status of refining and conversion facility dismantling. Progress in first half of 2010FY

    International Nuclear Information System (INIS)

    Kado, Kazumi; Sugitsue, Noritake; Morimoto, Yasuyuki; Ikegami, Sohei; Tanaka, Yoshio; Takahashi, Nobuo; Tokuyasu, Takashi

    2011-06-01

    The Refining and Conversion Facility located in the Ningyo-toge Environmental Engineering Center had the natural uranium conversion process and reprocessed uranium conversion process. The construction of this facility was started in 1979 and completed in October 1981. Dismantling of equipments in radiation controlled area of this facility was started from 2008, and all equipments in radiation controlled area will be dismantled by the 2011 fiscal year. This report describes the master plan of this decommissioning and shows as the progress in first half year of 2010FY, the actual time schedule, the method of decommissioning, the decommissioning progress appearance with photographs, work rates of each room / each worker class, and the quantity of dismantled materials and secondary wastes. (author)

  12. Present status of refining and conversion facility dismantling. Progress in first half of 2009FY

    International Nuclear Information System (INIS)

    Kado, Kazumi; Sugitsue, Noritake; Morimoto, Yasuyuki; Ikegami, Sohei; Tanaka, Yoshio; Takahashi, Nobuo; Tokuyasu, Takashi

    2010-03-01

    The Refining and Conversion Facility located in the Ningyo-toge Environmental Engineering Center had the natural uranium conversion process and reprocessed uranium conversion process. The construction of this facility was started in 1979 and completed in October 1981. Dismantling of equipments in radiation controlled area of this facility was started from 2008, and all equipments in radiation controlled area will be dismantled by the 2011 fiscal year. This report describes the master plan of this decommissioning and shows as the progress in first half year of 2009FY, the actual time schedule, the method of decommissioning, the decommissioning progress appearance with photographs, work rates of each room / each worker class, and the quantity of dismantled materials and secondary wastes. (author)

  13. Present status of refining and conversion facility dismantling. Progress in latter half of 2008FY

    International Nuclear Information System (INIS)

    Kado, Kazumi; Sugitsue, Noritake; Morimoto, Yasuyuki; Ikegami, Sohei; Takahashi, Nobuo; Tokuyasu, Takashi

    2010-01-01

    The Refining and Conversion Facility located in the Ningyo-toge Environmental Engineering Center had the natural uranium conversion process and reprocessed uranium conversion process. The construction of this facility was started in 1979 and completed in October 1981. Dismantling of equipments in radiation controlled area of this facility was started from 2008, and all equipments in radiation controlled area will be dismantled by the 2011 fiscal year. This report describes the master plan of this decommissioning and shows as the progress in latter half year of 2008FY, the actual time schedule, the method of decommissioning, the decommissioning progress appearance with photographs, work rates of each room/each worker class, and the quantity of dismantled materials and secondary wastes. (author)

  14. Dismantling techniques

    Energy Technology Data Exchange (ETDEWEB)

    Wiese, E.

    1998-03-13

    Most of the dismantling techniques used in a Decontamination and Dismantlement (D and D) project are taken from conventional demolition practices. Some modifications to the techniques are made to limit exposure to the workers or to lessen the spread of contamination to the work area. When working on a D and D project, it is best to keep the dismantling techniques and tools as simple as possible. The workers will be more efficient and safer using techniques that are familiar to them. Prior experience with the technique or use of mock-ups is the best way to keep workers safe and to keep the project on schedule.

  15. Dismantling techniques

    International Nuclear Information System (INIS)

    Wiese, E.

    1998-01-01

    Most of the dismantling techniques used in a Decontamination and Dismantlement (D and D) project are taken from conventional demolition practices. Some modifications to the techniques are made to limit exposure to the workers or to lessen the spread of contamination to the work area. When working on a D and D project, it is best to keep the dismantling techniques and tools as simple as possible. The workers will be more efficient and safer using techniques that are familiar to them. Prior experience with the technique or use of mock-ups is the best way to keep workers safe and to keep the project on schedule

  16. Dismantling of alpha contaminated obsolete installations and glove boxes on the IRMM site in Geel (Belgium)

    International Nuclear Information System (INIS)

    Cretskens, Pieter; Lenie, Koen; Melis, Gustaaf

    2007-01-01

    At the Institute for Reference Materials and Measurements (European commission, Joint Research Centre, IRMM) a dismantling campaign of obsolete installations and glove boxes has been carried out in 2005. There were various reasons for their removal. Some large installations did not meet modern safety standards, other installations were worn out and expected to cause a radioactive contamination risk in the future. The main goal was to create as less waste as possible by extensive contamination checks and by decontamination if necessary. For the glove boxes, decontamination was not possible. A controlled area was set up around the installation to be dismantled in order to prevent spreading of contamination from dust and dirt. This was only possible for the 'minor' contaminated installations. The dismantling campaign of the glove boxes was carried out by using tents of two types depending the contamination inside the glove boxes. The most common glove boxes were dismantled in a tent constructed with hard surfaced polycarbonate plates (ventilated cell). For glove boxes with higher contamination, the same principle was used but with a second 'glove box tent' inside (ventilated glove tent). The purpose of this project was to learn from the experience of this campaign which gave the ability to make estimates of future radioactive waste or classic waste that could be expected from dismantled installations. (authors)

  17. Process cells dismantling of EUREX pant: previous activities

    International Nuclear Information System (INIS)

    Gili, M.

    1998-01-01

    In the '98-'99 period some process cells of the EUREX pant will be dismantled, in order to place there the liquid wastes conditioning plant 'CORA'. This report resumes the previous activities (plant rinsing campaigns and inactive Cell 014 dismantling), run in the past three years and the drawn experience [it

  18. Development of decommissioning engineering support system for fugen. Development of support system during actual dismantlement works

    International Nuclear Information System (INIS)

    Masanori Izumi; Yukihiro Iguchi; Yoshiki Kannehira

    2005-01-01

    The Advanced Thermal Reactor, Fugen Nuclear Power Station was permanently shut down in March 2003, and is now preparing for decommissioning. We have been developing Decommissioning Engineering Support System (DEXUS) aimed at planning optimal dismantlement process and carrying out dismantlement work safely and precisely. DEXUS consists of 'decommissioning planning support system' and 'dismantling support system'. The dismantling support system is developed aiming at using during actual dismantling work. It consists of three subsystems such as 'Worksite Visualization System', 'Dismantling Data Collection System' and 'Generated Waste Management System'. 'Worksite Visualization System' is a support system designed to provide the necessary information to workers during actual dismantlement works. And this system adopts AR (Augmented Reality) technology, overlapping calculation information into real world. 'Dismantling Data Collection System' is to collect necessary data for improving accuracy of decommissioning planning by evaluating work content and worker equipage, work time for dismantlement works. 'Generated Waste Management system' is a system recording necessary information by attaching the barcode to dismantled wastes or the containers. We can get the information of generated waste by recording generation place, generated time, treatment method and the contents. These subsystems enable to carry out reasonable and safe decommissioning of Fugen. In addition, we expect that those systems will be used for decommissioning of other nuclear facilities in the future. (authors)

  19. Polybrominated diphenyl ethers in e-waste: Level and transfer in a typical e-waste recycling site in Shanghai, Eastern China

    Energy Technology Data Exchange (ETDEWEB)

    Li, Yue; Duan, Yan-Ping, E-mail: duanyanping@tongji.edu.cn; Huang, Fan; Yang, Jing; Xiang, Nan; Meng, Xiang-Zhou; Chen, Ling

    2014-06-01

    Highlights: • PBDEs were detected in the majority of e-waste. • PBDEs were found in TVs made in China after 1990. • The levels of ΣPBDEs in e-waste made in Japan far exceed the threshold limit of RoHS. • The inappropriate recycling and disposal of e-waste is an important source of PBDEs. - Abstract: Very few data for polybrominated diphenyl ethers (PBDEs) were available in the electronic waste (e-waste) as one of the most PBDEs emission source. This study reported concentrations of PBDEs in e-waste including printer, rice cooker, computer monitor, TV, electric iron and water dispenser, as well as dust from e-waste, e-waste dismantling workshop and surface soil from inside and outside of an e-waste recycling plant in Shanghai, Eastern China. The results showed that PBDEs were detected in the majority of e-waste, and the concentrations of ΣPBDEs ranged from not detected to 175 g/kg, with a mean value of 10.8 g/kg. PBDEs were found in TVs made in China after 1990. The mean concentrations of ΣPBDEs in e-waste made in Korea, Japan, Singapore and China were 1.84 g/kg, 20.5 g/kg, 0.91 g/kg, 4.48 g/kg, respectively. The levels of ΣPBDEs in e-waste made in Japan far exceed the threshold limit of RoHS (1.00 g/kg). BDE-209 dominated in e-waste, accounting for over 93%. The compositional patterns of PBDEs congeners resembled the profile of Saytex 102E, indicating the source of deca-BDE. Among the samples of dust and surface soil from a typical e-waste recycling site, the highest concentrations of Σ{sub 18}PBDEs and BDE-209 were found in dust in e-waste, ranging from 1960 to 340,710 ng/g and from 910 to 320,400 ng/g, which were 1–2 orders of magnitude higher than other samples. It suggested that PBDEs released from e-waste via dust, and then transferred to surrounding environment.

  20. Dismantling of an alpha contaminated hot cell at the Marcoule Pilot Plant

    International Nuclear Information System (INIS)

    Tachon, M.

    1988-01-01

    For the remodeling of Marcoule Pilot Plant, the cell 82: old unit for plutonium solution purification by extraction, was dismantled. About 42 tons of wastes were evacuated. Some wastes wen decontaminated by mechanical means other wastes with higher residual activity were stored for subsequent processing. The operation shows that dismantling of a hot cell is possible even if incorporated in an operating plant [fr

  1. Flow analysis of heavy metals in a pilot-scale incinerator for residues from waste electrical and electronic equipment dismantling

    International Nuclear Information System (INIS)

    Long, Yu-Yang; Feng, Yi-Jian; Cai, Si-Shi; Ding, Wei-Xu; Shen, Dong-Sheng

    2013-01-01

    Highlights: • Cu, Zn, Pb, and Ni are enriched in bottom ash from WEEE dismantling residues. • The heavy metal residual fraction restricts transfer in the incinerator. • Pre-treatment to remove heavy metals from WEEE residues would reduce emissions. -- Abstract: The large amount of residues generated from dismantling waste electrical and electronic equipment (WEEE) results in a considerable environmental burden. We used material flow analysis to investigate heavy metal behavior in an incineration plant in China used exclusively to incinerate residues from WEEE dismantling. The heavy metals tested were enriched in the bottom and fly ashes after incineration. However, the contents of heavy metals in the bottom ash, fly ash and exhaust gas do not have a significant correlation with that of the input waste. The evaporation and recondensation behavior of heavy metals caused their contents to differ with air pollution control equipment because of the temperature difference during gas venting. Among the heavy metals tested, Cd had the strongest tendency to transfer during incineration (T Cd = 69.5%) because it had the lowest melting point, followed by Cu, Ni, Pb and Zn. The exchangeable and residual fractions of heavy metals increased substantially in the incineration products compared with that of the input residues. Although the mass of residues from WEEE dismantling can be reduced by 70% by incineration, the safe disposal of the metal-enriched bottom and fly ashes is still required

  2. Flow analysis of heavy metals in a pilot-scale incinerator for residues from waste electrical and electronic equipment dismantling

    Energy Technology Data Exchange (ETDEWEB)

    Long, Yu-Yang; Feng, Yi-Jian; Cai, Si-Shi; Ding, Wei-Xu; Shen, Dong-Sheng, E-mail: shends@zju.edu.cn

    2013-10-15

    Highlights: • Cu, Zn, Pb, and Ni are enriched in bottom ash from WEEE dismantling residues. • The heavy metal residual fraction restricts transfer in the incinerator. • Pre-treatment to remove heavy metals from WEEE residues would reduce emissions. -- Abstract: The large amount of residues generated from dismantling waste electrical and electronic equipment (WEEE) results in a considerable environmental burden. We used material flow analysis to investigate heavy metal behavior in an incineration plant in China used exclusively to incinerate residues from WEEE dismantling. The heavy metals tested were enriched in the bottom and fly ashes after incineration. However, the contents of heavy metals in the bottom ash, fly ash and exhaust gas do not have a significant correlation with that of the input waste. The evaporation and recondensation behavior of heavy metals caused their contents to differ with air pollution control equipment because of the temperature difference during gas venting. Among the heavy metals tested, Cd had the strongest tendency to transfer during incineration (T{sub Cd} = 69.5%) because it had the lowest melting point, followed by Cu, Ni, Pb and Zn. The exchangeable and residual fractions of heavy metals increased substantially in the incineration products compared with that of the input residues. Although the mass of residues from WEEE dismantling can be reduced by 70% by incineration, the safe disposal of the metal-enriched bottom and fly ashes is still required.

  3. E AREA LOW LEVEL WASTE FACILITY DOE 435.1 PERFORMANCE ASSESSMENT

    Energy Technology Data Exchange (ETDEWEB)

    Wilhite, E

    2008-03-31

    This Performance Assessment for the Savannah River Site E-Area Low-Level Waste Facility was prepared to meet requirements of Chapter IV of the Department of Energy Order 435.1-1. The Order specifies that a Performance Assessment should provide reasonable assurance that a low-level waste disposal facility will comply with the performance objectives of the Order. The Order also requires assessments of impacts to water resources and to hypothetical inadvertent intruders for purposes of establishing limits on radionuclides that may be disposed near-surface. According to the Order, calculations of potential doses and releases from the facility should address a 1,000-year period after facility closure. The point of compliance for the performance measures relevant to the all pathways and air pathway performance objective, as well as to the impact on water resources assessment requirement, must correspond to the point of highest projected dose or concentration beyond a 100-m buffer zone surrounding the disposed waste following the assumed end of active institutional controls 100 years after facility closure. During the operational and institutional control periods, the point of compliance for the all pathways and air pathway performance measures is the SRS boundary. However, for the water resources impact assessment, the point of compliance remains the point of highest projected dose or concentration beyond a 100-m buffer zone surrounding the disposed waste during the operational and institutional control periods. For performance measures relevant to radon and inadvertent intruders, the points of compliance are the disposal facility surface for all time periods and the disposal facility after the assumed loss of active institutional controls 100 years after facility closure, respectively. The E-Area Low-Level Waste Facility is located in the central region of the SRS known as the General Separations Area. It is an elbow-shaped, cleared area, which curves to the northwest

  4. The radiation protection principles model as a tool in the e-waste procedures

    Energy Technology Data Exchange (ETDEWEB)

    Tsitomeneas, S. Th., E-mail: stsit@teipir.gr [Piraeus University of Applied Sciences, Aigaleo (Greece); Vourlias, K., E-mail: kvourlias@yahoo.gr [Aristotle University of Thessaloniki (Greece); Geronikolou, St. A., E-mail: sgeronik@bioacademy.gr [Biomedical Research Foundation Academy of Athens, Athens (Greece)

    2016-03-25

    The electrical and electronic waste (e-waste) management is a global environmental problem dominated by the precautionary principle application, resulted to preliminary and ambiguous potential adverse effects, of extensive scientific uncertainty. In order to overcome the detected stochastic effects confusions in this field, we propose the inclusion of the principles of justification-optimization-limitation and of prudent avoidance. This model is already, established in radiation protection, so that toxicity as a result of the e-waste management would decrease, whilst the precious metals would be saved. We, further, resolve the classification of rejected items as reusable or as waste, so that the procedure of dismantling and recycling becomes easier, and the collecting-transporting-placement at an e-waste landfill would be safer. In conclusion, our proposing pattern in the e-waste management enforces the sustainable reducing-reusing-recycling, saves time/money and advances safety by including more sources of e-waste (military, medical etc) that were excluded previously.

  5. The radiation protection principles model as a tool in the e-waste procedures

    International Nuclear Information System (INIS)

    Tsitomeneas, S. Th.; Vourlias, K.; Geronikolou, St. A.

    2016-01-01

    The electrical and electronic waste (e-waste) management is a global environmental problem dominated by the precautionary principle application, resulted to preliminary and ambiguous potential adverse effects, of extensive scientific uncertainty. In order to overcome the detected stochastic effects confusions in this field, we propose the inclusion of the principles of justification-optimization-limitation and of prudent avoidance. This model is already, established in radiation protection, so that toxicity as a result of the e-waste management would decrease, whilst the precious metals would be saved. We, further, resolve the classification of rejected items as reusable or as waste, so that the procedure of dismantling and recycling becomes easier, and the collecting-transporting-placement at an e-waste landfill would be safer. In conclusion, our proposing pattern in the e-waste management enforces the sustainable reducing-reusing-recycling, saves time/money and advances safety by including more sources of e-waste (military, medical etc) that were excluded previously.

  6. General Research and Development problems in dismantling

    International Nuclear Information System (INIS)

    Lorin, C.

    1993-01-01

    R and D studies for dismantling nuclear facilities have been conducted in several domains: safety evaluation (3D cameras, gamma camera, gamma low level control bench, alpha measures); general studies (such as the Baladin software, an expert system for dismantling); decontamination techniques (utilisation of acid or base liquids, laser, ...); cutting techniques and tools (remote controlled grinder, remote controlled robot, carrier crane); robotics for remote operations and handling; waste processing

  7. Dismantling of nuclear facilities: the industrial know-how

    International Nuclear Information System (INIS)

    Lellament, R.

    2004-01-01

    Numerous nuclear facilities in laboratories or research reactors have been decommissioned and dismantled over the 2 last decades throughout the world. The valuable feedback experience has allowed nuclear industry to design, upgrade and test specific techniques for dismantling. These techniques are efficient although they have been validated on a reduced number of nuclear power plants. In France only 3 power units have been dismantled: Chinon A1, A2 and Brennilis (EL4) and they are not representative of the real park of EDF'reactors. 6 PWR-type reactors have already been dismantled in the Usa. The results of a survey concerning 26 countries shows that the dismantling cost is around 320 dollars/kWe, it represents 15% of the construction cost which is far from being excessive as it is often read in the media. The dismantling costs can be broken into: - de-construction (25-55%), - wastes from dismantling (17-43%), - security and monitoring (8-13%), - site reclamation (5-13%), and - engineering and project management (5-24%). (A.C.)

  8. Decontamination and radioactivity measurement on building surfaces related to dismantling of Japan power demonstration reactor (JPDR)

    International Nuclear Information System (INIS)

    Hatakeyama, Mutsuo; Tachibana, Mitsuo; Yanagihara, Satoshi

    1997-12-01

    In the final stage of dismantling activities for decommissioning a nuclear power plant, building structures have to be demolished to release the site for unrestricted use. Since building structures are generally made from massive reinforced concrete materials, it is not a rational way to treat all concrete materials arising from its demolition as radioactive waste. Segregation of radioactive parts from building structures is therefore indispensable. The rational procedures were studied for demolition of building structures by treating arising waste as non-radioactive materials, based on the concept established by Nuclear Safety Commission, then these were implemented in the following way by the JPDR dismantling demonstration project. Areas of the JPDR facilities are categorized into two groups : possibly contaminated areas, and possibly non-contaminated areas, based on the document of the reactor operation. Radioactivity on the building surfaces was then measured to confirm that the qualitative categorization is reasonable. After that, building surfaces were decontaminated in such a way that the contaminated layers were removed with enough margin to separate radioactive parts from non-radioactive building structures. Thought it might be possible to demolish the building structures by treating arising waste as non-radioactive materials, confirmation survey for radioactivity was conducted to show that there is no artificial radioactive nuclides produced by operation in the facility. This report describes the procedures studied on measurement of radioactivity and decontamination, and the results of its implementation in the JPDR dismantling demonstration project. (author)

  9. Levels and isomer profiles of Dechlorane Plus in the surface soils from e-waste recycling areas and industrial areas in South China

    Energy Technology Data Exchange (ETDEWEB)

    Yu Zhiqiang [State Key Laboratory of Organic Geochemistry, Guangdong Key Laboratory of Environment and Resources, Guangzhou Institute of Geochemistry, Chinese Academy of Sciences, Guangzhou 510640 (China); Lu Shaoyou; Gao Shutao; Wang Jingzhi [State Key Laboratory of Organic Geochemistry, Guangdong Key Laboratory of Environment and Resources, Guangzhou Institute of Geochemistry, Chinese Academy of Sciences, Guangzhou 510640 (China); Graduate School of the Chinese Academy of Sciences, Beijing 100039 (China); Li Huiru, E-mail: huiruli@gig.ac.c [State Key Laboratory of Organic Geochemistry, Guangdong Key Laboratory of Environment and Resources, Guangzhou Institute of Geochemistry, Chinese Academy of Sciences, Guangzhou 510640 (China); Zeng Xiangying; Sheng Guoying; Fu Jiamo [State Key Laboratory of Organic Geochemistry, Guangdong Key Laboratory of Environment and Resources, Guangzhou Institute of Geochemistry, Chinese Academy of Sciences, Guangzhou 510640 (China)

    2010-09-15

    Dechlorane Plus (DP) is a highly chlorinated flame retardant. Levels of DP were measured in surface soils from e-waste recycling areas and industrial areas in South China. Higher DP levels were found in e-waste recycling areas (undetectable-47.4 ng/g) than those in industrial areas (0.0336-4.65 ng/g) in South China. The highest DP concentration (3327 ng/g) was found at the e-waste recycling site in Qingyuan, while DP levels fell dramatically with increasing distance away from the recycling site, suggesting that the e-waste recycling activities are an important source of DP emissions. The mean ratios of anti-DP to total DP (f{sub anti}) for different sampling areas ranged from 0.58 to 0.76 and showed no significant difference from the ratio for the technical DP products (t-test, p > 0.05). Further intensive studies are needed to investigate the process of DP degradation and its degradation products. - High DP concentrations were found in the soils from e-waste recycling regions, and e-waste recycling was the major source of DP emissions in South China.

  10. Remote dismantling of the French Brennilis nuclear power plant

    International Nuclear Information System (INIS)

    Studenski, Joerg

    2009-01-01

    The paper deals with the remote dismantling of the decommissioned EL4 prototype power plant Brennilis in France. The block contains the reactor pressure vessel including internals and biological shield, the piping and the control systems. The authors describe the general operation principle of the reactor to illustrate the peculiarities of the dismantling concept and the concept-related challenges. Detailed information is given concerning the following issues: creation of an access to the reactor block, the used remote technology, dismantling of the coolant piping and the axial shield, dismantling of the reactor pressure vessel and the lateral shield. Special attention is given on the minimization of the produced radioactive waste.

  11. Remote dismantling of the French Brennilis nuclear power plant

    Energy Technology Data Exchange (ETDEWEB)

    Studenski, Joerg [NUKEM Technologies GmbH (Germany)

    2009-07-01

    The paper deals with the remote dismantling of the decommissioned EL4 prototype power plant Brennilis in France. The block contains the reactor pressure vessel including internals and biological shield, the piping and the control systems. The authors describe the general operation principle of the reactor to illustrate the peculiarities of the dismantling concept and the concept-related challenges. Detailed information is given concerning the following issues: creation of an access to the reactor block, the used remote technology, dismantling of the coolant piping and the axial shield, dismantling of the reactor pressure vessel and the lateral shield. Special attention is given on the minimization of the produced radioactive waste.

  12. Decontamination and partial dismantling of the Eurochemic plant. Part 1

    International Nuclear Information System (INIS)

    Detilleux, E.; Geens, L.; Hild, W.; Klonk, W.

    1980-09-01

    A description is given of the partial dismantling of the dissolver used for fuel elements of up to 1.6 wt % 235 U enrichment, and of the total dismantling of the dissolver for highly enriched fuel elements. The corresponding head-end cells have been decontaminated, allowing prolonged interventions, either in view of refurbishing or complete dismantling. An assessment of required manpower, dose commitments, material consumption, and waste production for all operations is given. (author)

  13. Development of equipments for remote dismantling of joule heated ceramic melter

    International Nuclear Information System (INIS)

    Badgujar, Kiran T.; Usarkar, Sachin G.; Kumar, Binu; Nair, K.N.S.

    2011-01-01

    Joule Heated Ceramic Melter (JHCM) technology has been adopted for industrial scale vitrification of high level liquid waste (HLLW) at Tarapur and Kalpakkam. The melter installed at Advanced Vitrification System (AVS), Tarapur has immobilized 175 m 3 of HLLW in 113 canisters containing 11533Kg of Vitrified Waste Product (VWP). The melter has been in operation for 3 years before shutdown. It is intended to demonstrate the complete procedure of dismantling of Joule Melter in 1:1 scale prior to going in for actual dismantling in the hot cell. The Melter consists of an assembly of Inconel/SS pipes and plates, fuse cast refractories, thermal insulations of various types inside a SS casing and possibly some glass which is left over in the melter. Dismantling of melter involves remote cutting of the outer casing, pipe connections, electrical connections and removal, sizing and packing of internals in a sequential manner to minimise generation of secondary waste. The challenge involves development of remotely operated multi-degrees of freedom fixtures, modification and performance testing of standard industrial cutting and breaking tools and adapting them for remote operations. The work also involves development of equipments for collection of waste generated during the dismantling operation and packaging thus in special packages. Remotely actuated fixtures have been developed for remote top plate and side electrodes cutting. Remotely operated grab has been developed for handling of loose material and grippers have been developed for handling of refractory blocks. Industrial vacuum suction device has been modified into split units to enable for reducing the spread of powder material, while dismantling in progress. The performance test of developed fixtures, equipments, cutting and breaking tools have been carried on 1:1 scale melter model. Various parameters like cutting speed, cutting tool performance, generation of waste volume has been measured and analysed for

  14. The good wealth of dismantlement

    International Nuclear Information System (INIS)

    Maincent, G.

    2009-01-01

    Civil engineering, mechanical and waste conditioning companies are working hard on the market of nuclear facilities dismantling. This market has a great future ahead of it in the ten years to come. According to the European Commission, 50 to 60 reactors among the 157 actually in service in the European Union should be dismantled by 2025. The cost per reactor is estimated to 10-15% of the initial investment, which represents an enormous amount of money, estimated to 20-39 billion euros for the only French nuclear park. In France, this market is shared by a core of about 20 companies, like Spie Nucleaire, Onet, Vinci (Nuvia) and Areva. Some dismantling sites require a specific skill, in particular those in relation with the research activity of the CEA (the French atomic energy commission) or involving specific technologies (research reactors, spent fuel reprocessing plants, sodium-cooled rectors..). (J.S.)

  15. Decommissioning and dismantling reactors and managing waste

    International Nuclear Information System (INIS)

    Bensoussan, E.; Reicher-Fournel, N.

    2005-01-01

    In the early forties/fifties, a number of countries launched the first developments in the field of nuclear power. Some of them now have large numbers of nuclear facilities and nuclear power plants which have met, and continue to meet, the objectives for which they were designed and built. Other plants, including nuclear fuel production and enrichment plants, experimental reactors or research reactors, will have to be dismantled and demolished in the near future. These activities are handled differently in different countries as a function of specific energy policies, advanced development plants, current financial resources, the availability of qualified engineers and specialized industries able to handle projects of this kind, as well as other factors. All dismantling and demolition projects serve the purpose of returning the respective sites to green-field conditions. (orig.)

  16. Emerging halogenated flame retardants and hexabromocyclododecanes in food samples from an e-waste processing area in Vietnam.

    Science.gov (United States)

    Tao, Fang; Matsukami, Hidenori; Suzuki, Go; Tue, Nguyen Minh; Viet, Pham Hung; Takigami, Hidetaka; Harrad, Stuart

    2016-03-01

    This study reports concentrations of selected emerging halogenated flame retardants (HFRs) and hexabromocyclododecanes (HBCDs) in foodstuffs sourced from an e-waste processing area in Vietnam and two reference sites in Vietnam and Japan. Concentrations of all target HFRs in e-waste-impacted samples in this study exceed significantly (p e-waste processing activities exert a substantial impact on local environmental contamination and human dietary exposure. Significant linear positive correlations in concentrations of syn-Dechlorane Plus (DP) and anti-DP were found between soils and those in co-located chicken samples (p e-waste processing sites and non-e-waste processing areas elsewhere.

  17. Control of radioactive waste in dismantling of a nuclear facility; Control de residuos radiactivos en desmantelamiento de una instalacion nuclear

    Energy Technology Data Exchange (ETDEWEB)

    Campayo, E.

    2014-07-01

    In the dismantling of a nuclear facility are generated radioactive waste that must be suitably processed. The overall process, in a simplified manner, contemplates the characterization in origin, their segregation on the basis of physical, mechanical, and radiological characteristics and their packaging. (Author)

  18. Emergency Preparedness Hazards Assessment for solid waste management facilities in E-area not previously evaluated

    International Nuclear Information System (INIS)

    Hadlock, D.J.

    1999-01-01

    This report documents the facility Emergency Preparedness Hazards Assessment (EPHA) for the Solid Waste Management Department (SWMD) activities located on the Department of Energy (DOE) Savannah River Site (SRS) within E Area that are not described in the EPHAs for Mixed Hazardous Waste storage, the TRU Waste Storage Pads or the E-Area Vaults. The hazards assessment is intended to identify and analyze those hazards that are significant enough to warrant consideration in the SWMD operational emergency management program

  19. Dismantling at the CEA's Nuclear Energy Division: strategy and programmes

    International Nuclear Information System (INIS)

    Lecomte, C.; Prunele, D. de; Rozain, J.P.; Nokhamzon, J.G.; Tallec, M.

    2008-01-01

    The CEA's Nuclear Energy Division (DEN) nuclear facilities currently include seventeen reactors and thirty six other miscellaneous facilities, particularly laboratories, fuel processing units and facilities specific to waste management. Some of these are currently being dismantled or must be dismantled soon so that the DEN, the Nuclear Energy Division, can construct new equipment and thus have available a range of R and D facilities in line with the issues of the nuclear industry of the future. At CEA, the first nuclear facility dismantling operations go back several dozen years and involve numerous and varied facilities. The first operations of any significance took place in the 1960's and 1970's and covered, for example, the first plutonium plant at Fontenay-aux-Roses (total dismantling) and small research reactors or critical models - CESAR and PEGGY at Cadarache and MINERVE at Fontenay-aux Roses (civil engineering cleaned up and kept). At La Hague, the dismantling of AT1, a pilot workshop used by the CEA during the 1970's to process irradiated fuels from fast neutron reactors, was completed in March 2001 (IAEA former stage 3, excluding civil engineering demolition). On the other hand, during this period of first dismantling, the intermediate-sized reactors (G1, Rapsodie) were only partially dismantled after shut down, mainly due to the lack of graphite and sodium waste management routes at the time. About twenty facilities were thus dealt with up to 2001, in other words about half of all the nuclear facilities shut down permanently before this date. (authors)

  20. Study of large size fiber reinforced cement containers for solid wastes from dismantling

    International Nuclear Information System (INIS)

    Jaouen, C.

    1990-01-01

    The production of large-sized metallic waste by dismantling operations, and the evolution of the specifications of the waste to be stored in the different European countries will create a need for large standard containers for the transport and final disposal of the corresponding waste. The research conducted during the 1984-1988 programme, supported by the Commission of European Communities, and based on a comparative study of high-grade concrete materials, reinforced with organic or metallic fibres, led to the development of a high performance container meeting international transport recommendations as well as French requirements for shallow-ground disposal. The material selected, consisting of high-performance mortar with metal fibre reinforcement, was the subject of an intensive programme of characterization tests conducted in close cooperation with LAFARGE Company, demonstrating the achievement of mechanical and physical properties comfortably above the regulatory requirements. The construction of an industrial prototype and the subsequent economic analysis served to guarantee the industrial feasibility and cost of this system, in which attempts were made to optimize the finished package product, including its closure system

  1. Provision of the technical infrastructure for the dismantling of the WAK HAWC container. Design and realization

    International Nuclear Information System (INIS)

    Marquard, C.; Ripholz, M.; Lutz, W.

    2013-01-01

    The dismantling concept of the WAK HAWC (high-level liquid waste concentrate) containers includes remote handling equipment. Due to the solid deposits that formed during the concentrate storage time the activity and the dose rates of the containers are very high (2.6x10E15 Bq alpha and beta, dose rates higher 100 Sv/h). Therefore appropriate radiation protection measures have to be installed to protect personnel and environment. The provision of the technical infrastructure for the remote HAWC container dismantling is described in detail.

  2. The Japan Power Demonstration Reactor (JPDR) dismantling activities. Dismantling of the reactor enclosure and the auxiliary buildings

    International Nuclear Information System (INIS)

    Seiki, Yoshihiro; Kubo, Takashi.

    1996-01-01

    As the final stage of the JPDR decommissioning program, after the major components were removed from each building of JPDR, the dismantling activities proceeded to the decontamination of contaminated concrete surface and the final radiation survey of buildings. These activities were conducted to verify the developed techniques and the detailed procedures for decontamination, and to allow unrestricted use of the JPDR buildings. Following the decontamination of buildings, the dismantling of each building was started. Before dismantling the buildings, the radiation control designations were changed. The buildings that contaminated embedded pipes were changed from first-class radiation controlled areas to second-class radiation controlled areas. On the other hand, the buildings that had no contaminated pipes were changed to uncontrolled areas. A first-class radiation controlled area allows the use of unsealed sources ; thus, radioactive contamination may exist. A second-class radiation controlled area is one where only sealed sources are allowed. Significant quantities of data and experience were obtained during these activities. The practical procedures for decontamination, the final survey of radioactivity, and the dismantling work of buildings were described in this report. (author)

  3. Decontamination and dismantling of large plutonium-contamined glove boxes

    International Nuclear Information System (INIS)

    Draulans, J.

    1991-01-01

    This report describes the work performed in the frame of two C.E.C. - Contracts FI1D-002400-B Decommissioning of very large glove boxes and FI1D-0058 Decommissioning of a complex glove box structure to be dismounted partially on place. Detailed information is given about each glove box. The selection of the solution Transportation of the glove boxes to a specialized dismantling plant is justified. The necessary contacts inside the BELGONUCLEAIRE MOX plant and between the latter and other organizations are explained. The problems of manipulating large gloves are listed and the retained solution of building a so called Stiffening frame around each glove box is described. Furthermore information is given concerning required operators time for cleaning, manipulating, packing and dismantling together with received doses and quantities of waste produced. Concerning the glove box unit partially to be dismounted on place, detailed information is given about the way the glove boxes have been treated prior to this partial dismantling on place and about the way this partial dismantling has been performed. From these results one can conclude that such a delicate task can be performed without major difficulties. Finally information is given of the decontamination test of a highly Pu contaminated glove box with freon with rather poor results and of the preliminary CO 2 blasting tests on non active samples

  4. Treatment for dismantled radioactive solid waste from the TRIGA Mark-2 and 3

    International Nuclear Information System (INIS)

    Park, Seung Kook; Jung, Kyung Hwan

    1999-06-01

    Radioactive wastes are generally classified into 3 type depending on their physical property: liquid, solid and gaseous type. State-of -the art concerning liquid waste treatment has already been published; KAERI/TR-1315/99. Solid wastes classification package and treatment method will be studied to effectively manage them during the practical decommissioning work. All of the spent fuel produced during the operation of the TRIGA Mark-2 and 3 have been transported to the US last year, 1998, according to the spent fuel management strategy set-up by the US government for the non-proliferation of nuclear energy. Solid wastes are mainly all equipment existing inside of the reactors, activated concrete among the bio-shielded concrete, pipes, pimps, resin filter and it's housings, heat-exchangers, liquid waste storage tanks, to radioactive waste storage treatment facilities and so on. Solid wastes are generally low-level. They are classified according to the national regulation and nuclear law and IAEA Safety Standard Series ST-1(1996). Medium level radioactive wastes from reactor structures, mainly stainless steel component from the Rotary Specimen Rack(RSR) will be properly dismantled and stored in a shield container such as TIF(TRIGA Irradiated Fuel) container. While, low-level solid waste will be treated and packed in a ISO container(4m 3 ISO container for example) according to the IAEA recommendation. And combustible solid waste such as cloths, gloves, paper etc. will be packed in a 200 liters drum. This state-of-the art shows a general feature of the solid radioactive waste management which will be produced during the decommissioning of the TRIGA Mark-2 and 3 research reactors. (author). 17 refs., 17 tabs., 2 figs

  5. Experience in dismantling and packaging of pressure vessel and core internals

    International Nuclear Information System (INIS)

    Pillokat, Peter; Bruhn, Jan Hendrik

    2011-01-01

    Nuclear Company AREVA is proud to look back on versatile experience in successfully dismantling nuclear components. After performing several minor dismantling projects and studies for nuclear power plants, AREVA completed the order for dismantling of all remaining Reactor Pressure Vessel internals at German Boiling Water Reactor Wuergassen NPP in October '08. During the onsite activities about 121 tons of steel were successfully cut and packed under water into 200l- drums, as the dismantling was performed partly in situ and partly in an underwater working tank. AREVA deployed a variety of different cutting techniques such as band sawing, milling, nibbling, compass sawing and water jet cutting throughout this project. After successfully finishing this task, AREVA dismantled the cylindrical part of the Wuergassen Pressure Vessel. During this project approximately 320 tons of steel were cut and packaged for final disposal, as dismantling was mainly performed by on air use of water jet cutting with vacuum suction of abrasive and kerfs material. The main clue during this assignment was the logistic challenge to handle and convey cut pieces from the pressure vessel to the packing area. For this, an elevator was installed to transport cut segments into the turbine hall, where a special housing was built for final storage conditioning. At the beginning of 2007, another complex dismantling project of great importance was acquired by AREVA. The contract included dismantling and conditioning for final storage of the complete RPV Internals of the German Pressurized Water Reactor Stade NPP. Very similar cutting techniques turned out to be the proper policy to cope this task. On-site activities took place in up to 5 separate working areas including areas for post segmentation and packaging to perform optimized parallel activities. All together about 85 tons of Core Internals were successfully dismantled at Stade NPP until September '09. To accomplish the best possible on

  6. Atmospheric release model for the E-area low-level waste facility: Updates and modifications

    International Nuclear Information System (INIS)

    None, None

    2017-01-01

    The atmospheric release model (ARM) utilizes GoldSim® Monte Carlo simulation software (GTG, 2017) to evaluate the flux of gaseous radionuclides as they volatilize from E-Area disposal facility waste zones, diffuse into the air-filled soil pores surrounding the waste, and emanate at the land surface. This report documents the updates and modifications to the ARM for the next planned E-Area PA considering recommendations from the 2015 PA strategic planning team outlined by Butcher and Phifer.

  7. Atmospheric release model for the E-area low-level waste facility: Updates and modifications

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2017-11-16

    The atmospheric release model (ARM) utilizes GoldSim® Monte Carlo simulation software (GTG, 2017) to evaluate the flux of gaseous radionuclides as they volatilize from E-Area disposal facility waste zones, diffuse into the air-filled soil pores surrounding the waste, and emanate at the land surface. This report documents the updates and modifications to the ARM for the next planned E-Area PA considering recommendations from the 2015 PA strategic planning team outlined by Butcher and Phifer.

  8. DIRECT DISMANTLING OF REPROCESSING PLANT CELLS THE EUREX PLANT EXPERIENCEe2d12c

    International Nuclear Information System (INIS)

    Gili, M.; Troiani, F.; Risoluti, P.

    2003-01-01

    After finishing the reprocessing campaigns in 1970-1983, the EUREX pilot reprocessing plant of ENEA Saluggia Research Center started into a new phase, aiming to materials and irradiated fuel systemation and radioactive wastes conditioning. In 1997 the project ''CORA'' for a vitrification plant for the high and intermediate liquid radioactive wastes started. The ''CORA'' plant will be hosted in some dismantled cells of the EUREX plant, reusing many of the EUREX plant auxiliary systems, duly refurbished, saving money and construction time and avoiding a new nuclear building in the site. Two of the cells that will be reused were part of the EUREX chemical process (solvent recovery and 2nd extraction cycle) and the components were obviously internally contaminated. In 2000 the direct (hands-on) dismantling of one of them started and has been completed in summer 2002; the second one will be dismantled in the next year and then the ''CORA'' plant will be assembled inside the cells. Special care w as taken to avoid spread of contamination in the cells, where ''CORA'' installation activities will start in the next years, during the dismantling process The analysis of data and results collected during the dismantling of the first cell shows that direct dismantling can be achieved with careful choice of tools, procedures and techniques, to reduce volumes of wastes to be disposed and radiological burden

  9. Towards the creation of an industrial sector dedicated to nuclear dismantling

    International Nuclear Information System (INIS)

    Anon.

    2015-01-01

    In next decades the business of nuclear dismantling is expected to grow exponentially due to the decommissioning of nuclear facilities that will have reached the end of their operating life. Dismantling has 2 main features: dismantling operations on a same site can span decades and dismantling is a new activity in which innovations are likely to appear and may benefit other sectors. In France regional authorities have promoted public-private partnerships in order to make working together small enterprises very specialized in sectors like robotic, laser cutting, waste processing, remote operations... with public laboratories dedicated to nuclear research, and with graduate schools to include dismantling in curriculum and with major industrial operators of the nuclear industry. The aim is the creation of jobs and the building of an industrial sector able to win market shares in the worldwide business of nuclear dismantling. (A.C.)

  10. Abrasive water jet cutting technique for biological shield concrete dismantlement

    International Nuclear Information System (INIS)

    Konno, T.; Narazaki, T.; Yokota, M.; Yoshida, H.; Miura, M.; Miyazaki, Y.

    1987-01-01

    The Japan Atomic Energy Research Institute (JAERI) is developing the abrasive-water jet cutting system to be applied to dismantling the biological shield walls of the JPDR as a part of the reactor dismantling technology development project. This is a total system for dismantling highly activated concrete. The concrete biological shield wall is cut into blocks by driving the abrasive-water jet nozzle, which is operated with a remote, automated control system. In this system, the concrete blocks are removed to a container, while the slurry and dust/mist which are generated during cutting are collected and treated, both automatically. It is a very practical method and will quite probably by used for actual dismantling of commercial power reactors in the future because it can minimize workers' exposure to radioactivity during dismantling, contributes to preventing diffusion of radiation, and reduces the volume of contaminated secondary waste

  11. Proposed radiation hardened mobile vehicle for Chernobyl dismantlement and nuclear accident response

    International Nuclear Information System (INIS)

    Rowland, M.S.; Holliday, M.A.; Karpachov, J.A.

    1995-01-01

    Researchers are developing a radiation hardened, Telerobotic Dismantling System (TDS) to remediate the Chernobyl facility. To withstand the severe radiation fields, the robotic system, will rely on electrical motors, actuators, and relays proven in the Chernobyl power station. Due to its dust suppression characteristics and ability to cut arbitrary materials the authors propose using a water knife as the principle tool to slice up the large fuel containing masses. The front end of the robot will use a minimum number of moving parts by locating most of the susceptible and bulky components outside the work area. Hardened and shielded video cameras will be designed for remote control and viewing of the robotic functions. Operators will supervise and control robot movements based on feedback from a suite of sensory systems that would include vision systems, radiation detection and measurement systems and force reflection systems. A gripper will be instrumented with a variety of sensors (e.g. force, torque, or tactile), allowing varying debris surface properties to be grasped. The gripper will allow the operator to manipulate and segregate debris items without entering the radiologically and physically dangerous dismantlement operations area. The robots will initially size reduce the FCM's to reduce the primary sources of the airborne radionuclides. The robot will then remove the high level waste for packaging or decontamination, and storage nearby

  12. Clearance of radioactive materials during reactor dismantling. Permanent enclosure instead of demolition and renaturation?

    International Nuclear Information System (INIS)

    2016-01-01

    During reactor dismantling besides high-level radioactive wastes a large amount of low-level contaminated steel and concrete has to be disposed. In case that radioactivity falls below defined dose limits (10 micro Sv/person and year) these materials may be disposed in domestic waste landfill or in municipal incineration facilities. The issue is discussed in detail including the fact that many power plants are dismantled at the same time so that the contaminated materials might accumulate. Another issue is the occupational safety of contract workers during dismantling. The permanent enclosure could avoid this environmental contamination of decommissioned power plants might also be less expensive.

  13. SGN's Dismantling and Decommissioning engineering, projects experience and capabilities

    International Nuclear Information System (INIS)

    Destrait, L.

    1998-01-01

    Its experience in waste treatment, conditioning, storage and disposal, its cooperation with CEA and COGEMA Group in license agreements give SGN expertise in the decommissioning field. SGN's experience and background in all areas of nuclear facility decommissioning, such as chemical and mechanical cells, nuclear advanced reactors, reprocessing facilities result in fruitful references to the customers. The poster is presenting different achievements and projects with SGN's participation such as: - The decommissioning of Windscale Advanced Gas cooled Reactors (WAGR), in particular providing methodology and equipment to dismantle the Pressure and Insulation Vessel of the reactor. - The decommissioning plan of Ignalina (Lithuania) and Paldiski (Estonia), defining strategies, scenarios, necessary equipments and tools and choosing the best solutions to decommission the site under different influencing parameters such as cost, dose rate exposure, etc... - Th One Site Assistance Team (OSAT) at Chernobyl regarding the preparation works for the waste management and decommissioning of the plant. - The decommissioning of French nuclear facilities such as reprocessing (UP1) and reactor (EL4) plants. The important experience acquired during the facility management and during the first dismantling and decommissioning operations is an important factor for the smooth running of these techniques for the future. The challenge to come is to control all the operations, the choice of strategies, the waste management, the efficiency of tools and equipments, and to provide nuclear operators with a full range of proven techniques to optimise costs and minimize decommissioning personnel exposure. (Author)

  14. Waste electrical and electronic Equipment (E-Wastes) management in Ghana: environmental impacts at Agbogbloshie, Accra Ghana

    International Nuclear Information System (INIS)

    Manukure, Sampson Atiemo

    2016-07-01

    degree of contamination with BS (Cdeg=1173) being the highest followed by DS (Cdeg=988). The school compound showed the least degree of contamination (Cdeg=60). The human health risk assessment for adult workers within the scrap yard showed workers at the burning sites have the greatest risk of exposure (HI=5.9). In the case of children under six years of age the cumulative non cancer risk assessment revealed that the burning site posed the highest risk(HI=28) interestingly followed by the residential site, dismantling site, the school compound, the market and recreational areas. The barriers of environmentally sound e-wastes recycling identified in this study included; prices of metals, availability of unskilled labour, inadequate recycling infrastructure, absence of legal framework, competition from the informal sector as well as low level of environmental awareness. The integrated extended producer responsibility model proposed in this study is unique as it incorporates the principles of extended producer responsibility with government controlled e-waste fund system. The success of the e-waste management system depends largely on the commitment of all stakeholders. (au)

  15. Spatial distribution of heavy metal contamination in soils near a primitive e-waste recycling site.

    Science.gov (United States)

    Quan, Sheng-Xiang; Yan, Bo; Yang, Fan; Li, Ning; Xiao, Xian-Ming; Fu, Jia-Mo

    2015-01-01

    The total concentrations of 12 heavy metals in surface soils (SS, 0-20 cm), middle soils (MS, 30-50 cm) and deep soils (DS, 60-80 cm) from an acid-leaching area, a deserted paddy field and a deserted area of Guiyu were measured. The results showed that the acid-leaching area was heavily contaminated with heavy metals, especially in SS. The mean concentrations of Ni, Cu, Zn, Cd, Sn, Sb and Pb in SS from the acid-leaching area were 278.4, 684.1, 572.8, 1.36, 3,472, 1,706 and 222.8 mg/kg, respectively. Heavy metal pollution in the deserted paddy field was mainly concentrated in SS and MS. The average values of Sb in SS and MS from the deserted paddy field were 16.3 and 20.2 mg/kg, respectively. However, heavy metal contamination of the deserted area was principally found in the DS. Extremely high concentrations of heavy metals were also observed at some special research sites, further confirming that the level of heavy metal pollution was very serious. The geoaccumulation index (Igeo) values revealed that the acid-leaching area was severely polluted with heavy metals in the order of Sb > Sn > Cu > Cd > Ni > Zn > Pb, while deserted paddy field was contaminated predominately by metals in the order of Sb > Sn > Cu. It was obvious that the concentrations of some uncommon contaminants, such as Sb and Sn, were higher than principal contaminants, such as Ni, Cu, Zn and Pb, suggesting that particular attention should be directed to Sn and Sb contamination in the future research of heavy metals in soils from e-waste-processing areas. Correlation analysis suggested that Li and Be in soils from the acid-leaching area and its surrounding environment might have originated from other industrial activities and from batteries, whereas Ni, Cu, Zn, Cd, Pb, Sn and Sb contamination was most likely caused by uncontrolled electronic waste (e-waste) processing. These results indicate the significant need for optimisation of e-waste-dismantling technologies and remediation of polluted soil

  16. DISMANTLING OF THE FUEL CELL LABORATORY AT RESEARCH CENTRE JUELICH

    International Nuclear Information System (INIS)

    Stahn, B.; Matela, K.; Bensch, D.; Ambos, Frank

    2003-01-01

    The fuel cell laboratory was constructed in three phases and taken into operation in the years 1962 to 1966. The last experimental work was carried out in 1996. After all cell internals had been disassembled, the fuel cell laboratory was transferred to shutdown operation in 1997. Three cell complexes, which differed, in particular, by the type of shielding (lead, cast steel, concrete), were available until then for activities at nuclear components. After approval by the regulatory authority, the actual dismantling of the fuel cell laboratory started in March 2000. The BZ I laboratory area consisted of 7 cells with lead shieldings of 100 to 250 mm thickness. This area was dismantled from April to September 2000. Among other things, approx. 30,000 lead bricks with a total weight of approx. 300 Mg were dismantled and disposed of. The BZ III laboratory area essentially consisted of cells with concrete shieldings of 1200 to 1400 mm thickness. The dismantling of this area started in the fir st half of 2001 and was completed in November 2002. Among other things, approx. 900 Mg of concrete was dismantled and disposed of. Since more than 90 % of the dismantled materials was measurable for clearance, various clearance measurement devices were used during dismantling. The BZ II laboratory area essentially consists of cells with cast steel shieldings of 400 to 460 mm thickness. In September 2002 it was decided to continue using this laboratory area for future tasks. The dismantling of the fuel cell laboratory was thus completed. After appropriate refurbishment, the fuel cell laboratory will probably take up operation again in late 2003

  17. Decontamination and partial dismantling of the Eurochemic reprocessing plant. Lessons learnt with respect to health physics and waste management

    International Nuclear Information System (INIS)

    Osipenco, A.; Detilleux, E.; Ferrari, P.

    1980-01-01

    After nine years in use, the installations of the Eurochemic reprocessing plant were washed down and decontaminated to enable access to be gained to all the cells and some items of equipment, the reuse of which is not envisaged, and dismantled. The procedures followed to ensure the radiation protection of the workers and the means and results of individual dosimetry are described. Some suggestions, mainly covering the lay-out of the cells and the items of equipment, are made in order to reduce still more the doses incurred. The production and control of the liquid and solid waste resulting from the decontamination and dismantling illustrate the advantage of using very high pressure water jets on the one hand and a careful covering of the walls and floors on the other [fr

  18. Experience of the remote dismantling of the Windscale advanced gas-cooled reactor and Windscale pile chimneys

    International Nuclear Information System (INIS)

    Wright, E.M.

    1993-01-01

    This paper gives brief descriptions of some of the remote dismantling work and equipment used on two large decommissioning projects: the BNFL Windscale Pile Chimneys Project (remote handling machine, waste packaging machine, remotely controlled excavator, remotely controlled demolition machine) and the AEA Windscale Advanced Gas-cooled Reactor Project (remote dismantling machine, operational waste, bulk removal techniques, semi-remote cutting operations)

  19. Recycling of concrete waste generated from nuclear power plant dismantling

    International Nuclear Information System (INIS)

    Ogawa, Hideo; Nagase, Takahiro; Tanaka, Hiroaki; Nawa, Toyoharu

    2012-01-01

    Non-radioactive concrete waste generated from dismantling of a standard large nuclear power plant is estimated to be about 500,000 tons in weight. Using such waste as recycled aggregate within the enclosure of the plant requires a new manufacturing technology that generates a minimal amount of by-product powder. Recycled aggregate has brittle parts with defects such as cracks, pores, and voids in residual paste from original concrete. This study presents a method of selectively removing the defective parts during manufacture to improve the quality of the recycled fine aggregate. With this selective removal method used, the amount of by-product powder can be reduced by half as compared to that by a conventional method. The influences of the characteristics of the recycled fine aggregate on the flowability and strength of the mortar using recycled fine aggregate were evaluated by multiple linear regression analysis. The results clearly showed that the flowability was primarily affected by the filling fraction of recycled fine aggregate, while the compressive strength of mortar was primarily affected by the fraction of defects in the aggregate. It was also found that grains produced by a granulator have more irregularities in the surfaces than those produced by a ball mill, providing an increased mortar strength. Using these findings from this study, efforts are also being made to develop a mechanical technology that enables simultaneous processing of decontamination and recycling. The granulator under consideration is capable of grinding the surfaces of irregularly shaped particles and may be used successfully, under optimal conditions, for the surface decontamination of concrete waste contaminated with radioactive materials. (author)

  20. Evaluating and planning the radioactive waste options for dismantling the Tokamak Fusion Test Reactor

    Energy Technology Data Exchange (ETDEWEB)

    Rule, K.; Scott, J.; Larson, S. [Princeton Plasma Physics Lab., NJ (United States)] [and others

    1995-12-31

    The Tokamak Fusion Test Reactor (TFTR) is a one-of-a kind tritium fusion research reactor, and is planned to be decommissioned within the next several years. This is the largest fusion reactor in the world and as a result of deuterium-tritum reactions is tritium contaminated and activated from 14 Mev neutrons. This presents many unusual challenges when dismantling, packaging and disposing its components and ancillary systems. Special containers are being designed to accommodate the vacuum vessel, neutral beams, and tritium delivery and processing systems. A team of experienced professionals performed a detailed field study to evaluate the requirements and appropriate methods for packaging the radioactive materials. This team focused on several current and innovative methods for waste minimization that provides the oppurtunmost cost effective manner to package and dispose of the waste. This study also produces a functional time-phased schedule which conjoins the waste volume, weight, costs and container requirements with the detailed project activity schedule for the entire project scope. This study and project will be the first demonstration of the decommissioning of a tritium fusion test reactor. The radioactive waste disposal aspects of this project are instrumental in demonstrating the viability of a fusion power reactor with regard to its environmental impact and ultimate success.

  1. Radiochemistry Lab Decommissioning and Dismantlement. AECL, Chalk River Labs, Ontario, Canada

    International Nuclear Information System (INIS)

    Kenny, Stephen

    2008-01-01

    Atomic Energy of Canada (AECL) was originally founded in the mid 1940's to perform research in radiation and nuclear areas under the Canadian Defense Department. In the mid 50's The Canadian government embarked on several research and development programs for the development of the Candu Reactor. AECL was initially built as a temporary site and is now faced with many redundant buildings. Prior to 2004 small amounts of Decommissioning work was in progress. Many reasons for deferring decommissioning activities were used with the predominant ones being: 1. Reduction in radiation doses to workers during the final dismantlement, 2. Development of a long-term solution for the management of radioactive wastes in Canada, 3. Financial constraints presented by the number of facilities shutdown that would require decommissioning funds and the absence of an approved funding strategy. This has led to the development of a comprehensive decommissioning plan that is all inclusive of AECL's current and legacy liabilities. Canada does not have a long-term disposal site; therefore waste minimization becomes the driving factor behind decontamination for decommissioning before and during dismantlement. This decommissioning job was a great learning experience for decommissioning and the associated contractors who worked on this project. Throughout the life of the project there was a constant focus on waste minimization. This focus was constantly in conflict with regulatory compliance primarily with respect to fire regulations and protecting the facility along with adjacent facilities during the decommissioning activities. Discrepancies in historical documents forced the project to treat every space as a contaminated space until proven differently. Decommissioning and dismantlement within an operating site adds to the complexity of the tasks especially when it is being conducted in the heart of the plant. This project was very successful with no lost time accidents in over one hundred

  2. Informal e-waste recycling: environmental risk assessment of heavy metal contamination in Mandoli industrial area, Delhi, India.

    Science.gov (United States)

    Pradhan, Jatindra Kumar; Kumar, Sudhir

    2014-01-01

    Nowadays, e-waste is a major source of environmental problems and opportunities due to presence of hazardous elements and precious metals. This study was aimed to evaluate the pollution risk of heavy metal contamination by informal recycling of e-waste. Environmental risk assessment was determined using multivariate statistical analysis, index of geoaccumulation, enrichment factor, contamination factor, degree of contamination and pollution load index by analysing heavy metals in surface soils, plants and groundwater samples collected from and around informal recycling workshops in Mandoli industrial area, Delhi, India. Concentrations of heavy metals like As (17.08 mg/kg), Cd (1.29 mg/kg), Cu (115.50 mg/kg), Pb (2,645.31 mg/kg), Se (12.67 mg/kg) and Zn (776.84 mg/kg) were higher in surface soils of e-waste recycling areas compared to those in reference site. Level exceeded the values suggested by the US Environmental Protection Agency (EPA). High accumulations of heavy metals were also observed in the native plant samples (Cynodon dactylon) of e-waste recycling areas. The groundwater samples collected form recycling area had high heavy metal concentrations as compared to permissible limit of Indian Standards and maximum allowable limit of WHO guidelines for drinking water. Multivariate analysis and risk assessment studies based on total metal content explains the clear-cut differences among sampling sites and a strong evidence of heavy metal pollution because of informal recycling of e-waste. This study put forward that prolonged informal recycling of e-waste may accumulate high concentration of heavy metals in surface soils, plants and groundwater, which will be a matter of concern for both environmental and occupational hazards. This warrants an immediate need of remedial measures to reduce the heavy metal contamination of e-waste recycling sites.

  3. Comments on conceptual questions concerning the clearance of wastes for disposal on a dump site during the decommissioning and dismantling of the nuclear power plant Obrigheim (KWO); Stellungnahme zu konzeptionellen Fragen der Freigabe zur Beseitigung auf einer Deponie bei Stilllegung und Abbau des Kernkraftwerks Obrigheim (KWO)

    Energy Technology Data Exchange (ETDEWEB)

    Kueppers, Christian

    2015-08-03

    The comments on conceptual questions concerning the clearance of wastes for disposal on a dump site during the decommissioning and dismantling of the nuclear power plant Obrigheim (KWO) cover the following issues: fundamentals of the 10 micro-Sv concept for clearance; specific regulations for the clearance of wastes from the dismantling of KWO for disposal on a dump site; disposal concept at shutdown and dismantling of KWO; measurements and control during clearance for disposal during shutdown and dismantling of KWO; documentation and reports.

  4. Study on treatment of dust by dismantling

    International Nuclear Information System (INIS)

    Torikai, K.; Suzuki, K.

    1987-01-01

    In dismantling of nuclear reactors, various kinds of treatment of dust generated by cutting or dismantling concrete structures of components of reactors are evaluated for safety, cost, and performance comparing the work in air with water. A method of dust treatment for work in air is discussed. The dry method has an easy operation in practice and a good performance in the equipment, but has problem on the prevention from radioactive contamination by diffusion of dust in air. For the purpose of advancing the strong points and eliminating the weak points in dry method, an improved venturi scrubber system is proposed for dismantling work as a dust collecting system. The system consists of dust absorbing pipe, dust collector, separator of dust and water and dust transfer equipment to a storage of waste. This system would be expected to have better performance and lower operating cost in decommissioning nuclear reactors, especially, the number of dust filters, for example, HEPA filters, will be considerably saved

  5. User Interface Technology to Reduce Mental Transformations for Tangible Remote Dismantling Simulator

    Energy Technology Data Exchange (ETDEWEB)

    Hyun, Dongjun; Kim, Ikjune; Lee, Jonghwan; Kim, Geun-Ho; Jeong, Kwan-Seong; Choi, Byung-Seon; Moon, Jeikwon; Choi, Jong-Won [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2015-10-15

    High-level radiation of the major components restricts access by human workers, and makes an accident or outage during the dismantling process more difficult to deal with. Since unexpected situations causes waste of budget and an aggravation of safety, the preliminary verification of the dismantling processes and equipment by the tangible remote dismantling simulator is very important. The design optimization of the dismantling processes and equipment is one of the most important objectives of the tangible remote dismantling simulator, as well. This paper proposes a user interface technology to reduce mental transformations for the tangible remote dismantling simulator. At the dismantling process simulation using the tangible remote dismantling simulator, the most difficult work is the remote operation handling the high degrees-of-freedom (DOF) manipulator due to complex mental transformations. The proposed user interface technology reduces mental transformations with constraints using the point projection and direction projection. The test result of the cutting process over the closure head of the RPV demonstrates that the proposed mental transformation reduction technology is operated successfully in the tangible remote dismantling simulator, and lets the operator be easy to control the high DOF manipulator even in the most difficult operation by reducing DOFs to be controlled manually.

  6. User Interface Technology to Reduce Mental Transformations for Tangible Remote Dismantling Simulator

    International Nuclear Information System (INIS)

    Hyun, Dongjun; Kim, Ikjune; Lee, Jonghwan; Kim, Geun-Ho; Jeong, Kwan-Seong; Choi, Byung-Seon; Moon, Jeikwon; Choi, Jong-Won

    2015-01-01

    High-level radiation of the major components restricts access by human workers, and makes an accident or outage during the dismantling process more difficult to deal with. Since unexpected situations causes waste of budget and an aggravation of safety, the preliminary verification of the dismantling processes and equipment by the tangible remote dismantling simulator is very important. The design optimization of the dismantling processes and equipment is one of the most important objectives of the tangible remote dismantling simulator, as well. This paper proposes a user interface technology to reduce mental transformations for the tangible remote dismantling simulator. At the dismantling process simulation using the tangible remote dismantling simulator, the most difficult work is the remote operation handling the high degrees-of-freedom (DOF) manipulator due to complex mental transformations. The proposed user interface technology reduces mental transformations with constraints using the point projection and direction projection. The test result of the cutting process over the closure head of the RPV demonstrates that the proposed mental transformation reduction technology is operated successfully in the tangible remote dismantling simulator, and lets the operator be easy to control the high DOF manipulator even in the most difficult operation by reducing DOFs to be controlled manually

  7. Status of the Digital Mock-up System for the dismantling of the nuclear facilities

    International Nuclear Information System (INIS)

    Park, Hee Seoung; Kim, S. K.; Lee, K. W.; Oh, W. J.

    2004-12-01

    The database system have already developed is impossible to solve a quantitative evaluation about a various situation from the dismantle activities of the reactor had contaminated with radioactivity. To satisfy the requirements for safety and economical efficiency among a major decommissioning technologies, it need a system that can evaluate and estimate dismantling scheduling, amount of radioactive waste being dismantled, and decommissioning cost. We have review and analyzed status of the digital mock-up system to get a technical guide because we have no experience establishment of one relation to dismantling of research reactor and nuclear power plant

  8. Getting a remote grip on defence waste: a survey of the US DoE's Robotic Technology Development Programme

    International Nuclear Information System (INIS)

    Yarbrough, L.W.

    1994-01-01

    Robots are being developed to work in various practical applications at US Department of Environment site clean-up projects. The sites involved contain large quantities of radioactive waste and contaminated facilities left from the nuclear weapons programme. Four areas of short-term applied robotics have been identified. The first of these is Tank Waste Retrieval which requires the use of long-reach robot manipulators. The second is the Contaminant Analysis Automation programme in which equipment to automate the characterization of chemical, biological and radiological samples is being developed. Developing systems to handle and pre-process mixed waste containers and their contents, and to deal with the final processed waste forms, is the object of the Mixed Waste Operations programme. Decontamination and dismantling is the fourth major robotics area. Linking all these projects together and directed at common areas of concern is the longer-term Cross Cutting and Advanced Technology programme. (UK)

  9. NucLab Marcoule. A laboratory facility dedicated to support dismantling operations

    International Nuclear Information System (INIS)

    Dugne, O.; Houssin, A.; Pierre, D.; Bec-Espitalier, L.

    2013-06-01

    Formerly dedicated to plutonium production support, NucLab was renovated to perform a wide range of analyses for dismantling, plant operation and process development activities mainly on Marcoule site but also outside (Veurey, Fontenay aux Roses). The Laboratory is under a CEA AREVA partnership as a CEA entity operated by AREVA employees. It provides services to several industrial operators (nuclear process and power plant) in the fields of analytical chemistry, radioactivity measurements, in situ nuclear measurements, decontamination processes and industrial chemistry processes, waste treatments to meet the following analysis requirements. NucLab today is able to support research, production and dismantling activities in all part of dismantling operations. (authors)

  10. Lead exposure is associated with risk of impaired coagulation in preschool children from an e-waste recycling area.

    Science.gov (United States)

    Zeng, Zhijun; Huo, Xia; Zhang, Yu; Xiao, Zhehong; Zhang, Yuling; Xu, Xijin

    2018-05-12

    Environmental lead exposure leads to various deleterious effects on multiple organs and systems, including the hematopoietic system. To explore the effects of lead exposure on platelet indices in preschool children from an informal, lead-contaminated electronic waste (e-waste) recycling area, we collected venous blood samples from 466 preschool children (331 from an e-waste area (Guiyu) and 135 from a non-e-waste area (Haojiang)). Child blood lead levels (BLLs) were determined by graphite furnace atomic absorption spectrophotometry, while platelet indices were quantified using a Sysmex XT-1800i hematology analyzer. Higher blood lead levels are observed in e-waste lead-exposed preschool children. Significant relationships between high blood lead levels (exceeding current health limits) and elevated platelet count (PLT), plateletcrit (PCT), mean platelet volume (MPV), and platelet large cell ratio (P-LCR) were also uncovered. Furthermore, the median PLT and PCT levels of children from the exposed group both exceeded the respective recommended maximum reference range value, whereas the reference group did not. Location of child residence in Guiyu and BLLs were both risk factors related to platelet indices. These results suggest that high blood lead exposure from e-waste recycling may increase the risk of an amplified coagulation process through the activation of platelets in preschool children.

  11. Evaluation of decontamination during dismantling of plutonium-contaminated glove boxes

    International Nuclear Information System (INIS)

    Kinugasa, Manabu; Taguchi, Seigi; Ohzeki, Satoru; Inoue, Yoshiaki; Kashima, Sadamitsu

    1981-01-01

    The dismantling work of plutonium-contaminated glove boxes was carried out. These glove boxes had been used for the R and D of plutonium-uranium mixed oxide fuel for 15 years. The work was carried out in a pressure-controlled greenhouse, and the contamination of air in the greenhouse was monitored continuously. In order to reduce the contamination of air during dismantling, the decontamination and fixation of loose contaminants on the surfaces of glove boxes were very important. The correlation between decontamination and the contamination of air regarding dismantling is reported in this paper. The surface contamination density of the glove boxes was measured utilizing the smear method before and after the decontamination, and the decontamination effects were estimated. The contamination of air during dismantling was continuously measured with a plutonium dust monitor. It was found that loose contamination exponentially decreased by the decontamination process. When the so-called wet glove boxes, which contained wet recovery and waste disposal apparatus, were dismantled, the contamination of air did not exceed 500 (MPC) a. However, the contamination of air exceeded 500 (MPC) a several times in the present work of dismantling the so-called dry glove boxes which had been used for the fabrication of plutonium-uranium mixed oxide pellets. (Kato, T.)

  12. Method of processing dismantled products of radiation-contaminated equipments and transportation container therefor

    International Nuclear Information System (INIS)

    Komura, Shiro; Heki, Hideaki.

    1991-01-01

    In a method of decontaminating dismantled products of radiation-contaminated equipments removed at nuclear power facilities and classifying the dismantled products depending on their remaining radioactivity levels measured at a processing facility, the dismantled products are contained in a transportation container, to which decontamination liquids are injected and they are transferred to the processing facility. The decontaminated liquid wastes are drained from the transportation container, the dismantled products are washed while being contained in the transportation container as they are. Then, they are transferred to a step for measuring their remaining radioactivity level. This can shorten the time from the containment of the dismantled products to the transportation container to the completion of the decontamination, to improve the efficiency for the decontamination processing. Further, by separately containing the dismantled products on every kind of materials to respective containers, the processing time can be appropriately controlled respectively even if the dissolving efficiency to the decontamination liquids is different depending on the materials. (T.M.)

  13. Chest circumference and birth weight are good predictors of lung function in preschool children from an e-waste recycling area

    NARCIS (Netherlands)

    Zeng, Xiang; Xu, Xijin; Zhang, Yuling; Li, Weiqiu; Huo, Xia

    2017-01-01

    The purpose of this study was to investigate the associations between birth weight, chest circumference, and lung function in preschool children from e-waste exposure area. A total of 206 preschool children from Guiyu (an e-waste recycling area) and Haojiang and Xiashan (the reference areas) in

  14. REUSE OF AUTOMOTIVE COMPONENTS FROM DISMANTLED END OF LIFE VEHICLES

    Directory of Open Access Journals (Sweden)

    Piotr NOWAKOWSKI

    2013-12-01

    Full Text Available The problem of recycling end of life automotive vehicles is serious worldwide. It is one of the most important streams of waste in developed countries. It has big importance as recycling potential of raw materials content in automotive vehicles is valuable. Different parts and assemblies after dismantling can also be reused in vehicles where replacement of specific component is necessary. Reuse of the components should be taken into consideration in selecting the vehicles dismantling strategy. It also complies with European Union policy concerning end of life vehicles (ELV. In the paper it is presented systematic approach to dismantling strategies including disassembly oriented on further reuse of components. It is focused on decision making and possible benefits calculation from economic and environmental point of view.

  15. The dismantling of nuclear installations and the radioactive wastes management. Report of the President of the Republic followed by the answers of concerned administrations and organisms; Le demantelement des installations nucleaires et la gestion des dechets radioactifs. Rapport au President de la Republique suivi des reponses des administrations et des organismes interesses

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-01-15

    The discussed subjects concerns the situation and the challenges of the nuclear installations dismantling and the radioactive wastes management (main intervenors, panorama of the situation, rules applied to the dismantling and the radioactive wastes), the first experiences of dismantling and radioactive wastes disposal (experiences at the CEA and EDF, implementing of solutions for the disposal), interrogations and certainties (provision for future expenses, public information). (A.L.B.00.

  16. Cleaning and dismantling of a high activity laboratory (abstract and presentation slides)

    Energy Technology Data Exchange (ETDEWEB)

    Bredel; Thierry; Buzare, Alain

    2005-01-01

    The high activity laboratories have been built at the end of the 50ies. The particularity of this facility was that about 14 different laboratories worked in 14 different fields (biology, production of Cs and Cf sources, metallurgy, mechanical testing ...). Because of the optimization of the nuclear research, the CEA decided to close progressively this facility and to transfer the different experiments in other places. This action began in 1997 and is planed to end in 2010. 6 laboratories have been closed from 1997 to 2001 and the dismantling of the shielded cells has begun since 2002. Therefore, several laboratories have been cleaned of the materials and experiments. Nevertheless, the main particularity of this subject is that some experimental activities have been pursued during the cleaning and dismantling of other laboratories. For example, we describe the dismantling of the laboratory that performed metallurgical and mechanical characterization of irradiated materials. This laboratory occupied 20 lead cells and 2 glove boxes. The exploitation of those cells has been stopped progressively (12 at the end of 2001 and 5 at the end of 2003). The end of the last 3 cell exploitation is planed to end 2005. Since the end of 2001, 9 lead cells have been cleaned. Their dismantling is planed for next the two years. In parallel, we will clean all the other cells. During this phase we will have also to transfer all the irradiated samples (about 5000) that are still in the laboratory to the waste treatment facility of the CEA centre or to the new laboratory which has been presented during the previous hotlab meeting in Saclay. The paper gives details for background about ended operations: Organization, waste production, specific designs which improve radioprotection, waste destinations and costs, Difficulties and feedback experience of dismantling. (Author)

  17. Dismantling large components at the Jose-Cabrera NPP (CNJC) in Spain

    International Nuclear Information System (INIS)

    Santiago, Juan Luis

    2012-01-01

    Located in central Spain, near Madrid, the Jose-Cabrera NPP (also known as Zorita) is the first PWR to be dismantled in Spain. The unit is a one-loop Westinghouse PWR, with a capacity of 150 MW. The plant was shut down in 1996 and ENRESA (Empresa Nacional de Residuos Radioactivos) has decided its prompt decommissioning, starting in 2010. In preparation for decommissioning, a full system decontamination (FSD) of the whole reactor cooling system (including the reactor vessel in the flow path) was carried out in 2006-7. The large components to be dismantled include: the reactor pressure vessel (RPV) and the internals; the vessel head; the SG; the pressurizer and the surge line; the reactor coolant pump, and the primary loop piping The objective of the project is not only to ensure the safe and efficient dismantling of those large components, but also to gain experience and to learn lessons to be applied during the future decommissioning and dismantling of the remaining six operating PWRs in Spain, whose operational lives are currently planned to end between 2021 and 2028. ENRESA has defined a waste-management policy for decommissioning activities, which includes Waste-management routes and optimisation. A case study describes the results obtained by ENRESA in the specific case of CNJC large components (including the RPV) dismantling project: Removal and conditioning of large components as a single piece is not considered a viable option. Segmentation therefore is required and 2 options have been analysed: large pieces for disposal in a large container and small pieces for disposal in approved concrete packages (CE-2a and the smaller CE-2b). The use of the CE-2b package is a feasible option and is easy to implement as a logical extension from the CE-2a. The use of the CE-2b package results in an important reduction in the total volume of final waste packages and does not require, in itself, any changes in the current waste handling and kinematics. The large size

  18. EDF's dismantling experience

    International Nuclear Information System (INIS)

    Mira, J.J.

    1993-01-01

    The dismantling policy at EDF, taking into account technical, economical and socio-political factors, is presented. The various current realizations are reviewed and their dismantling solution discussed: Chinon A2, Chinon A1, Marcoule G1, G2, G3, Brennilis (EL4). Several dismantling projects are also described (Chinon A3, St-Laurent A1-A2, Chooz A). The various dismantling operations are presented and scheduled

  19. Visualization of a dismantling environment for an evaluation of a worker's dose during the decommissioning of KRR-1 and 2

    International Nuclear Information System (INIS)

    Park, Hee Seong; Kim, Sung Kyun; Lee, Kune Woo; Jung, Chong Hun; Jin, Seong Il

    2008-01-01

    The purpose of this paper is to provide a basis for an optimization of a dismantling process of a research reactor and nuclear facility. An optimization of a dismantling process should be at the beginning of a study for an evaluation of the radioactivity inventory and the safety of the workers. Many countries have conducted an optimization to achieve a shortened dismantling schedule, a reduction of the amount of waste, and cut down on the decommissioning by using computer graphics such as animation, simulation, and virtual reality. In the present study, we propose methods for identifying the existence of radioactivity which is contained in the dismantled objects and for evaluating a worker's dose through a simulation. To evaluate a worker's external dose under a virtual dismantling environment generated by computer graphics, the shape of the thermal column horizontal door was created by 3D CAD and the radiation dose surrounding the door was calculated by using MCNP-4C. An animation that can demonstrate a dismantling procedure according to a dismantling scenario was produced. For matching the radiation dose, which was calculated by MCNP-4C with an area where workers are dismantling a door, a simulation module was developed which could show a worker's external dose in real-time. The result from the distribution of the radioactivity enables us to specify where the most contaminated part of the dismantling objects is. In the animation, a virtual worker demonstrated a dismantling activity procedure as a chosen scenario. In the simulation, a worker's exposure dose rate in real-time has been evaluated

  20. Method for dismantling shields

    International Nuclear Information System (INIS)

    Fukuzawa, Rokuro; Kondo, Nobuhiro; Kamiyama, Yoshinori; Kawasato, Ken; Hiraga, Tomoaki.

    1990-01-01

    The object of the present invention is to enable operators to dismantle shieldings contaminated by radioactivity easily and in a short period of time without danger of radiation exposure. A plurality of introduction pipes are embedded previously to the shielding walls of shielding members which contain a reactor core in a state where both ends of the introduction pipes are in communication with the outside. A wire saw is inserted into the introduction pipes to cut the shieldings upon dismantling. Then, shieldings can be dismantled easily in a short period of time with no radiation exposure to operator's. Further, according to the present invention, since the wire saw can be set easily and a large area can be cut at once, operation efficiency is improved. Further, since remote control is possible, cutting can be conducted in water and complicated places of the reactor. Biting upon starting the wire saw in the introduction pipe is reduced to facilitate startup for the rotation. (I.S.)

  1. Characterisation and materials flow management for waste electrical and electronic equipment plastics from German dismantling centres.

    Science.gov (United States)

    Arends, Dagmar; Schlummer, Martin; Mäurer, Andreas; Markowski, Jens; Wagenknecht, Udo

    2015-09-01

    Waste electrical and electronic equipment is a complex waste stream and treatment options that work for one waste category or product may not be appropriate for others. A comprehensive case study has been performed for plastic-rich fractions that are treated in German dismantling centres. Plastics from TVs, monitors and printers and small household appliances have been characterised extensively. Based on the characterisation results, state-of-the-art treatment technologies have been combined to design an optimised recycling and upgrade process for each input fraction. High-impact polystyrene from TV casings that complies with the European directive on the restriction of hazardous substances (RoHS) was produced by applying continuous density separation with yields of about 60%. Valuable acrylonitrile butadiene styrene/polycarbonate can be extracted from monitor and printer casings by near-infrared-based sorting. Polyolefins and/or a halogen-free fraction of mixed styrenics can be sorted out by density separation from monitors and printers and small household appliances. Emerging separation technologies are discussed to improve recycling results. © The Author(s) 2015.

  2. SGDES: Management system dismantling of ENRESA

    International Nuclear Information System (INIS)

    Julian, A. de; Fernandez, M.; Vidaechea, S.

    2013-01-01

    ENRESA, the Spanish public company responsible for managing radioactive waste and nuclear facilities decommissioning, has developed a management information system (SGDES) for the decommissioning of nuclear power plants. Dismantling activities require a rigorous operations control within highly specialized, process systematization and safety framework, both under human and technological point of view. SGDES system is capable of responding to the mentioned operational needs, efficiently and safely.

  3. The Japan Power Demonstration Reactor dismantling project. Radiation control

    International Nuclear Information System (INIS)

    Tomii, Hiroyuki; Seiki, Yoshihiro

    1996-01-01

    In the Japan Power Demonstration Reactor (JPDR) dismantling project, radiation control was performed properly with routine and special monitoring to keep the occupational safety and to collect data necessary for future dismantling of nuclear facilities. This report describes a summary of radiation control in the dismantling activities and some results of parametric analysis on dose equivalent evaluation, and introduces the following knowledge on radiological protection effectiveness of the dismantling systems applied in the project. a) Use of remote dismantling systems was effective in reducing equivalent workplace exposure. b) Utilization of existing facilities as radiation shield or radioactivity containment was effective in reducing workplace exposure, and also in increasing work efficiency. c) Use of underwater cutting systems was useful to minimize air contamination, and to reduce the dose equivalent rate in the working area. d) In the planning of dismantling, it is necessary to optimize the radiation protection by analyzing dismantling work procedures and evaluating radiological features of the dismantling systems applied, including additional work which the systems require brought from such activities. (author)

  4. Better uses for financial reserves. Reserves for decommisioning, dismantling and waste management could be used for changing energy sructures

    International Nuclear Information System (INIS)

    Irrek, W.

    1996-01-01

    The reserves laid back by German operators of nuclear power plants for decommissioning, dismantling and waste management amounted to more than DM 44 billion in 1994, and the sum is still increasing. With this money, the public utilities intend to strengthen their competitive position in other industrial sectrors. The author proposes to transfer this money into public funds instead in order to ensure that it is used in an economically more efficient manner. (orig./RHM) [de

  5. Who should foot the bill? A discussion of alternative organizational models to finance dismantling and radioactive waste disposal

    International Nuclear Information System (INIS)

    Jaensch, Elisabeth; Hirschhausen, Christian von; Moeckel, Christian

    2017-01-01

    Based on the costs-by-cause principle everybody has to be responsible for the environmental damage produced. Accordingly the electricity supply companies should have to pay for the dismantling of nuclear power plants and the radioactive waste disposal. The implementation of a fond under public law seems to be an adequate solution. Critical arguments concerning the costs-by-cause principle shows that instead of a constrained enforcement of this principle a solution in the sense of the society as a whole should be in the focus.

  6. Jose Cabrera dismantling and decommissioning project

    International Nuclear Information System (INIS)

    Ondaro, Manuel

    2013-01-01

    The Jose Cabrera Nuclear Power Plant (NPP) was the first commercial power reactor (Westinghouse 1 loop PWR 510 MWth, 160 MWe) commissioned in Spain and provided the base for future development and training. The reactor construction started in 1963 and it was officially on-line by 1969. The NPP operated from 1969 until 2006 when it became the first reactor to be shut down after completing its operational period. The containment is reinforced concrete with a stainless steel head. In 2010 responsibility for D and D was transferred to Enresa to achieve IAEA level 3 (a green field site available for unrestricted re-uses) by 2017. Of the total of more than 104,000 tons of materials that will be generated during dismantling, it is estimated that only ∼4,000 tons will be radioactive waste, some of which, 40 t are considered as intermediate level long-lived wastes and the rest (3,960 t) will be categorized as VLLW and ILLW. The Project is divided into five phases: Phase 0 - Removal of fuel and preliminary work.. Phase 1 - Preparatory Activities for D and D. complete. Phase 2 - Dismantling of Major Components. Phase 3 - Removal of Auxiliary Installations, Decontamination and Demolition. Phase 4 - Environmental Restoration. Phase 2, is currently ongoing (50% completed). To manage the diverse aspects of decommissioning operations, Enresa uses an internally developed computerized project management tool. The tool, based on knowledge gathered from other Enresa projects, can process operations management, maintenance operations, materials, waste, storage areas, procedures, work permits, operator dose management and records. Enresa considers that communication is important for both internal and external stakeholder relations and can be used to inform, to neutralize negative opinions and attitudes, to remove false expectations and for training. Enresa has created a new multi-purpose area (exhibition/visitor centre) and encourages visits from the public, local schools, local and

  7. Jose Cabrera dismantling and decommissioning project

    Energy Technology Data Exchange (ETDEWEB)

    Ondaro, Manuel [ENRESA, Madrid (Spain)

    2013-07-01

    The Jose Cabrera Nuclear Power Plant (NPP) was the first commercial power reactor (Westinghouse 1 loop PWR 510 MWth, 160 MWe) commissioned in Spain and provided the base for future development and training. The reactor construction started in 1963 and it was officially on-line by 1969. The NPP operated from 1969 until 2006 when it became the first reactor to be shut down after completing its operational period. The containment is reinforced concrete with a stainless steel head. In 2010 responsibility for D and D was transferred to Enresa to achieve IAEA level 3 (a green field site available for unrestricted re-uses) by 2017. Of the total of more than 104,000 tons of materials that will be generated during dismantling, it is estimated that only ∼4,000 tons will be radioactive waste, some of which, 40 t are considered as intermediate level long-lived wastes and the rest (3,960 t) will be categorized as VLLW and ILLW. The Project is divided into five phases: Phase 0 - Removal of fuel and preliminary work.. Phase 1 - Preparatory Activities for D and D. complete. Phase 2 - Dismantling of Major Components. Phase 3 - Removal of Auxiliary Installations, Decontamination and Demolition. Phase 4 - Environmental Restoration. Phase 2, is currently ongoing (50% completed). To manage the diverse aspects of decommissioning operations, Enresa uses an internally developed computerized project management tool. The tool, based on knowledge gathered from other Enresa projects, can process operations management, maintenance operations, materials, waste, storage areas, procedures, work permits, operator dose management and records. Enresa considers that communication is important for both internal and external stakeholder relations and can be used to inform, to neutralize negative opinions and attitudes, to remove false expectations and for training. Enresa has created a new multi-purpose area (exhibition/visitor centre) and encourages visits from the public, local schools, local and

  8. Decommissioning of nuclear facilities: COGEMA expertise devoted to UP1 reprocessing plant dismantling programme

    International Nuclear Information System (INIS)

    Gay, A.

    2001-01-01

    Over the last past decades, the French nuclear industry has acquired a great experience and know-how in the field of dismantling. Today this experience amounts to more than 200,000 hours. The fundamental aims within dismantling strategy are the same as for all nuclear facilities: minimising doses received by workers, minimising waste volume and adapting waste management to radioactivity levels, minimising costs. French experience is based on technologies which are currently used in nuclear maintenance facilities. Dismantling is a dynamic process especially in the field of decontamination (chemical and mechanical), cleaning, robotics and remote control operations. The strategy for the dismantling of former UP1 reprocessing plant is based on the feedback of experience gained through the dismantling of other facilities such as the AT1 workshop at La Hague. This workshop, a pilot plant for reprocessing of fast-breeder reactor fuels (Rapsodie and Phenix) has to be dismantled to IAEA level 3 (unrestricted site use), excluding civil works structures. Currently conducted by trained shifts, this dismantling project should end in 1999. The experience already acquired proves that chemical rinsings with the use of specific reagents is sufficient to decontaminate the hot cells and that the use of remote operations or robotics is not as important as previously envisaged. The UP1 reprocessing plant of Marcoule operated from 1958 to 1997. End of the operation was pronounced on the 31st of December 1997. 20,000 tons of spent fuels were reprocessed at UP1. The cleaning and dismantling operations at the Marcoule site depend upon the CEA, EDF and COGEMA. The Defence and Industry Ministries asked for a specific structure to be set up. An economic interest group called CODEM was created in May 1996. CODEM decides, finances and supervises dismantling operations, while respecting the constraints of nuclear safety, environmental protection and cost-effectiveness. The cleaning operations of

  9. Technology and costs for dismantling a Swedish nuclear power plant

    International Nuclear Information System (INIS)

    1979-10-01

    Various estimates concerning the costs of decommissioning a redundant nuclear power reactor to the green fields state are given in the literature. The purpose of this study is to provide background material for the Swedish nuclear power utilities to estimate the costs and time required to dismantle an ASEA-ATOM Boiling Water Reactor. The units Oskarshamn II and Barsebeck 1, both with an installed capacity of approximately 600 MW, serve as reference plants. The time of operation before final shutdown is assumed to be 40 years. Dismantling operations are initiated one year after shutdown. When the dismantling of the plant is finished, the site is to be released for unrestricted use. The costs for dismantling and subsequent final disposal of the radioactive waste are estimated at approximately SEK 500 million (approximately US dollars 120 million) in terms of 1979 prices. The sum includes 25% contingency. The dismantling cost is equivalent to 10-15% of the installation cost of an equivalent new nuclear power plant. The exact percentage is dependent on the interest rate during the construction period. It is shown in the study that a total dismantling can be accomplished in less than five years. This report is a compilation of studies performed by ASEA-ATOM and VBB based on premises given by KBS. The reports from these studies are presented in appendices. (Auth.)

  10. Method of freezing type dismantling for wasted reactors

    International Nuclear Information System (INIS)

    Tatsumi, Toshiyuki.

    1985-01-01

    Purpose: To enable to operate a cutting device in the air by placing a working table on ice while utilizing the ice as radiation shielding materials thereby prevent the diffusion of air contaminations. Method: Upon dismantling a BWR type reactor, ice is packed into a reactor container and a pressure vessel and frozen state is maintained by cooling coils disposed to the outer circumference of the pressure vessel. Then, an airtight hood is covered over the pressure vessel and a working table is rotatably disposed therein. Upon working, when the upper layer ice is melted by a heat pump and discharged, the airtight hood is lowered to a predetermined level. After freezing the melted portion again at the lowered level, cutting work is conducted by an operator in the hood. The cut pieces are conveyed after hoisting the airtight hood by a crane. The pressure vessel is dismantled by repeating the foregoing procedures. In this way, cut pieces can be recovered without falling them to the reactor bottom as in the conventional work in water. In addition, since the procedures are conducted while covering the airtight hood, diffusion of air contaminations can be prevented. (Kamimura, M.)

  11. Minimizing waste in environmental restoration

    International Nuclear Information System (INIS)

    Thuot, J.R.; Moos, L.

    1996-01-01

    Environmental restoration, decontamination and decommissioning, and facility dismantlement projects are not typically known for their waste minimization and pollution prevention efforts. Typical projects are driven by schedules and milestones with little attention given to cost or waste minimization. Conventional wisdom in these projects is that the waste already exists and cannot be reduced or minimized; however, there are significant areas where waste and cost can be reduced by careful planning and execution. Waste reduction can occur in three ways: beneficial reuse or recycling, segregation of waste types, and reducing generation of secondary waste

  12. The abrasive blasting technique. Matching the waste minimisation precept

    International Nuclear Information System (INIS)

    Welbers, Philipp; Noll, Thomas; Braehler, Georg; Sohnius, Bern

    2010-01-01

    Nowadays main challenges in the nuclear industry are, besides the development and design of new facilities, the dismantling of outlived nuclear installations and subsequent waste handling. Not only Germany but all countries and institutions which are involved in our business face similar problems: A large quantity of slightly contaminated waste, equipment and civil structures, arise inevitably during operation and, especially, during dismantling. This waste occurs in a huge amount due to its bulky nature, e.g. pipe-work. Storage of bulky items is very expensive and would not be compatible with the waste minimisation precept. Treatment in an ecological correct and economical beneficial way is the key factor in dealing with this waste. This means decontamination of the waste up to clearance levels where possible. A suitable solution is the Abrasive Blasting Technique. (orig.)

  13. Conception of dismantling cell for glove box with alpha contamination

    International Nuclear Information System (INIS)

    Mangin, D.

    1987-01-01

    The new dismantling cell of Valduc treats particularly alpha glove boxes. This cell is conceived to reduce the intervention inside for man with ventilated clothes and to reduce the volume of alpha wastes by utilization of manipulators and appropriate tools. The respect of low level norms (0.1 Ci/ton) for storage of alpha wastes conductes us to make a first decontamination, to ameliorate the detection in quantity of plutonium in the wastes and for wastes with a level upper the norm to make studies on decontamination by Freon 113 [fr

  14. The Hot Cell Radioactive Waste Concept of Forschungszentrum Juelich

    International Nuclear Information System (INIS)

    Pott, G.; Halaszovich, St.

    1999-01-01

    During the last 30 years extensive scientific examinations on radioactive metals,ceramics and fuel elements have been carried out, so that a high volume of waste has resulted. Also from the dismantling of irradiated facilities metallics waste has o be handed. Prior for equipment repair the hot cell involved has to be decontaminated and a large amount of lower active waste is produced. The waste is collected for conditioning and storing. There are different categories as: low active liquid waste, low active burnable waste, fuel waste, low and high active metallic waste. For each waste category special transport container are used. For the volume reduction our Waste Department is equipped with special facilities e.g.: furnace for burning, drying, liquids evaporators, hydraulic press for pelletizing, decontamination box for the dismantling ad cleaning of components. After conditioning the waste will be stored on site or transported to final storage in a salt mine (ERAM) . Special documentation has to be done for the acceptance of this waste

  15. A process for separating aggregate from concrete waste during the dismantlement of nuclear power plants

    International Nuclear Information System (INIS)

    Koga, Yasuo; Inoue, Toshikatsu; Tateyashiki, Hisashi; Sukekiyo, Mitsuaki; Okamoto, Masamichi; Asano, Touichi.

    1997-01-01

    The decommissioning and dismantling of nuclear power plants will produce a large quantity of non-active waste concrete. From the viewpoint of recycling of this waste concrete the recovery of aggregate contained in concrete at 80% and reuse of it into a new plant construction are envisioned. For these purposes we have studied the recovery process of aggregate from concrete composed of a heating step followed by a milling step onto waste concrete blocks. We have found that higher operation temperature brings a better effect for the separation of aggregate from a concrete body, however too high temperature may reversely degrade a quality of recovered aggregate itself. The most effective heating temperature which is considered not to give the damage to a quality of aggregate stays between 200-500degC. The effect of a duration at such temperature zone is relatively small. As a conclusion we have found that 300degC of heating temperature and 30-120 minutes of a duration in a rod mill with high efficiency of rubbing work for getting coarse aggregate and an agitate mill for fine aggregate might be proper operating conditions under which we can recover both coarse and fine aggregate with the quality within JASS 5N standard. (author)

  16. Management of activated parts generated during the dismantling of linear accelerators for medical uses

    International Nuclear Information System (INIS)

    Ortiz, Teresa; Correa, Cristina

    2008-01-01

    During years 2006-2008 have been carried out to the dismantling of several linear accelerators of medical use in Spain. The two first were in the Hospital of 'La Princesa' in Madrid and in the Hospital 'Santa Creu y Sant Pau' in Barcelona. The disassembling of such was made by technicians of the providing company and of the own hospital, with the advising of experts of the Radiological Protection and Radiophysics Service of such. Technicians of the Radiological Protection Technical Unit (RPU) of ENRESA collaborated in these dismantlings with the objective to determine that pieces could be evacuated conventionally as metallic scraps and which had to be managed as radioactive waste. In the following dismantling the classification of the pieces were carried out by the technicians of the providing company. After that the technicians of the RPU of ENRESA verified this classification and characterized, in detail, the pieces classified as radioactive wasted before their removal. In this paper the activities carried out to classify the pieces and the legal bases in which it leans on, as well as the measures made for the characterization of the materials considered as radioactive waste are described. (author)

  17. Recycling of concrete generated from Nuclear Power Plant dismantling

    International Nuclear Information System (INIS)

    Ogawa, Hideo; Nawa, Toyoharu; Ishikura, Takeshi; Tanaka, Hiroaki

    2013-01-01

    Reactor decommissioning required various technologies such as dismantling of facilities, decontamination, radioactivity measurement and recycling of dismantling wastes. This article discussed recycling of demolished concrete wastes. Dismantling of reactor building of large one unit of nuclear power plants would generate about 500 K tons of concrete wastes, about 98% of which was non-radioactive and could be used as base course material or backfill material after crushed to specified particle size. Since later part of 1990s, high quality recycled aggregate with specified limit of bone-dry density, water absorptivity and amount of fine aggregate had been developed from demolished concrete with 'Heat and rubbing method', 'Eccentric rotor method' and 'Screw grinding method' so as to separate cements attached to aggregate. Recycled aggregates were made from concrete debris with 'Jaw crusher' to particle size less than 40 mm and then particle size control or grinded by various grinding machines. Recycled fine aggregates made from crushing would have fragile site with cracks, air voids and bubbles. The author proposed quality improvement method to selectively separate fragile defects from recycled aggregates using weak grinding force, leaving attached pastes much and preventing fine particle generation as byproducts. This article outlined experiments to improve quality of recycled fine aggregates and their experimental results confirmed improvement of flow ability and compressive strength of mortal using recycled fine aggregates using 'Particle size selector' and 'Ball mill' so as to remove their fragile parts less than 2%. Mortal made from recycled fine aggregate could also prevent permeation of chloride ion. Recycled aggregate could be used for concrete instead of natural aggregate. (T. Tanaka)

  18. Heavy metal contamination characteristic of soil in WEEE (waste electrical and electronic equipment) dismantling community: a case study of Bangkok, Thailand.

    Science.gov (United States)

    Damrongsiri, Seelawut; Vassanadumrongdee, Sujitra; Tanwattana, Puntita

    2016-09-01

    Sue Yai Utit is an old community located in Bangkok, Thailand which dismantles waste electrical and electronic equipment (WEEE). The surface soil samples at the dismantling site were contaminated with copper (Cu), lead (Pb), zinc (Zn), and nickel (Ni) higher than Dutch Standards, especially around the WEEE dumps. Residual fractions of Cu, Pb, Zn, and Ni in coarse soil particles were greater than in finer soil. However, those metals bonded to Fe-Mn oxides were considerably greater in fine soil particles. The distribution of Zn in the mobile fraction and a higher concentration in finer soil particles indicated its readily leachable character. The concentration of Cu, Pb, and Ni in both fine and coarse soil particles was mostly not significantly different. The fractionation of heavy metals at this dismantling site was comparable to the background. The contamination characteristics differed from pollution by other sources, which generally demonstrated the magnification of the non-residual fraction. A distribution pathway was proposed whereby contamination began by the deposition of WEEE scrap directly onto the soil surface as a source of heavy metal. This then accumulated, corroded, and was released via natural processes, becoming redistributed among the soil material. Therefore, the concentrations of both the residual and non-residual fractions of heavy metals in WEEE-contaminated soil increased.

  19. The dismantling of fast reactors: sodium processing

    International Nuclear Information System (INIS)

    Rodriguez, G.; Berte, M.; Serpante, J.P.

    1999-01-01

    Fast reactors require a coolant that does not slow down neutrons so water can not be used. Metallic sodium has been chosen because of its outstanding neutronic and thermal properties but sodium reacts easily with air and water and this implies that sodium-smeary components can not be considered as usual nuclear wastes. A stage of sodium neutralizing is necessary in the processing of wastes from fast reactors. Metallic sodium is turned into a chemically stable compound: soda, carbonates or sodium salts. This article presents several methods used by Framatome in an industrial way when dismantling sodium-cooled reactors. (A.C.)

  20. Modelling the cooling and partial dismantling of the Febex in-situ test

    International Nuclear Information System (INIS)

    Sanchez, M.; Gens, A.; Guimaraes, L.

    2010-01-01

    Document available in extended abstract form only. In many designs for radioactive waste disposal the space between the canister and the cavity surface is filled by an engineered barrier made up of compacted expansive clay. Engineered barrier and adjacent host rock will be submitted to the heating effect of the nuclear waste as well as to associated hydraulic and mechanical phenomena that interact in a complex way. In order to achieve a safe and robust repository design, it is necessary to have a good understanding of the processes that occur in the near field and their evolution over time. To this end, properly instrumented full scale in situ tests provide essential information. The in-situ test operated at full scale and under natural conditions at the underground laboratory managed by NAGRA (Swiss National Cooperative for the Disposal of Radioactive Waste) at the Grimsel test site in Switzerland. Two 4300 W heaters were placed in the axis of the horizontal drift in the natural rock (granite). The heaters were 4.54 m long and 0.90 m in diameter, and were intended to simulate the release of heat by nuclear waste. The space between the rock surface and the heaters was backfilled using blocks of compacted bentonite. The test area was sealed with a 2.7 m long concrete plug. The test was heavily instrumented, including 632 sensors that were installed in the clay barrier and in the rock with measurements of temperatures, relative humidity (equivalent to total suction), pore pressures, displacements, and stresses. The heaters were symmetrically placed in relation to the central section of the test. The power of the heaters was adjusted to maintain a 100 deg. C temperature at the interface between heaters and bentonite barrier. The test was run in this way for five years when one of the heaters was switched off and dismantled. Dismantling data provided extremely valuable information about the state of the barrier at the end of the experiment and a useful benchmark for

  1. Radiological impact of very slightly radioactive copper and aluminium recovered from dismantled nuclear facilities

    International Nuclear Information System (INIS)

    Garbay, H.; Chapuis, A.M.; Cahuzac, O.; Guetat, P.; Haristoy, D.; Renaud, P.

    1991-01-01

    This work is in keeping with a large evaluation of doses likely to be received by public and non nuclear workers when dismantling nuclear installations. A bibliographic study and inquiries are realized, in the nuclear field to evaluate quantities of very slightly radioactive materials, in the conventional copper and aluminium recovery fields: waste recovery, metal refinery and processing, occupational or domestic uses of the metals or their alloys. In fact copper and aluminium waste arising from the dismantling of nuclear installations are mainly electrical cables constituents including insulation material which is mainly polyvinyle chloride (PVC). Estimated quantities are relatively low compared to steel quantities arising from dismantling. The study is based on the hypothesis of two PWRs dismantled per year, estimated quantities are 200 tonnes of copper, 40 tonnes of aluminium and 500 tonnes of PVC. A special case is also studied, which is the dismantling of low and medium uranium enrichment plant in Pierrelatte (France); the plant pipework is mainly made of an aluminium and magnesium alloy: AG3. From these informations, one can define exposure scenarios which may occur with a non negligible probability. The doses likely to be received under the foreseen conditions are calculated. Reference doses are established from recommendations of international organisations as ICRP, IAEA, NEA. Comparing the calculated doses and the reference doses, the activity level of the initial waste can be deduced as to follow the recommendations. The mean specific activity of main beta-gamma emitters in copper, aluminium and PVC are of the same order of magnitude, 10Bq.g -1 . In the case of alpha emitters specific activity levels depend on the material and on the radionuclide, from 2 Bq.g -1 to 10 Bq.g -1 in copper, from 10 Bq.g -1 to 50 Bq.g -1 in aluminium

  2. On-site and off-site atmospheric PBDEs in an electronic dismantling workshop in south China: Gas-particle partitioning and human exposure assessment

    International Nuclear Information System (INIS)

    An Taicheng; Zhang Delin; Li Guiying; Mai Bixian; Fu Jiamo

    2011-01-01

    Gas samples and total suspended particle during work and off work time were investigated on-site and off-site electronic waste dismantling workshop (I- and O-EWDW), then compared with plastic recycling workshop (PRW) and waste incineration plant (WIP). TSP concentrations and total PBDE were 0.36-2.21 mg/m 3 and 27-2975 ng/m 3 at different workshops, respectively. BDE-47, -99, and -209 were major ΣPBDE congeners at I-EWDW and WIP, while BDE-209 was only dominant congener in PRW and control sites during work time and all sites during off work time. The gas-particle partitioning result was well correlated with the subcooled liquid vapor pressure for all samples, except for WIP and I-EDWD, at park during work time, and residential area during off work time. The predicted urban curve fitted well with measured φ values at O-DEWD during work time, whereas it was slightly overestimated or underestimated for others. Exposure assessment revealed the highest exposure site was I-EDWD. - Highlights: → On- and off-site atmospheric PBDEs was monitored in e-waste dismantling workshops in south China. → The gas-particle partitioning result was well correlated with the subcooled liquid vapor pressure for some samples. → Exposure assessment revealed that workers in I-EDWD were the highest exposure population. - The findings of this study may serve as a valuable reference for future risk assessment and environmental management in Guiyu, South China.

  3. The Grenoble CEA Center: dismantled and rehabilitated

    International Nuclear Information System (INIS)

    Anon.

    2013-01-01

    The denuclearization program of the CEA center in Grenoble was launched in 2001. It involves 6 nuclear facilities (3 research reactors: Melusine, Siloette, and Siloe, and 1 laboratory (LAMA) and 2 units for processing wastes). The dismantling works were finished at the end of 2012 and the 2013 program concerns: the demolition of the buildings homing Melusine and Siloe reactors, the final rehabilitation of the Siloe raft, and the final rehabilitation of the laboratory and of the waste processing units. The budget is 117*10 6 euros for Siloe, 28*10 6 euros for Melusine, 6*10 6 euros for Siloette, 70*10 6 euros for the LAMA, and 90*10 6 euros for the 2 waste processing units. (A.C.)

  4. The dismantling of nuclear installations in the Grenoble CEA centre - Press book 2013

    International Nuclear Information System (INIS)

    Laveissiere, Stephane; Coronini, Vincent

    2013-01-01

    After having outlined the importance of the project for the Grenoble CEA centre, this document presents the objectives, issues and challenges of dismantling activities performed on various nuclear installations located in the CEA centre of Grenoble. Objectives are presented in terms of agenda, predicted production of radioactive wastes, budget, personnel and steering committee. The various nuclear installations are presented: experimental reactors (Melusine, Siloe, Siloette), LAMA (laboratory of analysis of active materials), STED (station for the treatment of effluents and wastes). The safety and protection of workers is addressed in terms of protection and monitoring measures, and of exposure to radiations. The next part deals with the monitoring of the environment (actors, history of control of the centre's releases, control points, releases, atmosphere monitoring, and hydrological monitoring). A second part presents the global strategy of the CEA for its activities of sanitation and nuclear dismantling: present operations, dismantling activities in Fontenay-aux-Roses and in Marcoule, economic organization, contribution of advanced technology in radiological measurement and control, simulation and modelling, decontamination techniques, cutting operations, and remotely controlled operations

  5. Deliberated opinion of the Environment Authority concerning the dismantling of the Ulysse reactor (CEA Saclay)

    International Nuclear Information System (INIS)

    2010-01-01

    As the Ulysse reactor of Saclay is about to be dismantled, this report discusses the content of a request made by the CEA to definitely stop and dismantle this reactor. After having recalled the origin of this dismantling project and its regulatory framework, it describes the actual works which are planned, and outlines the main challenges to be faced. It discusses the content of the environmental report or impact study, notably the analysis of the initial condition, the analysis of direct and indirect effects of the project on the environment and health, and of the envisaged measures (waste management, liquid and gaseous effluent management, risk management, radiological exposure of workers in charge of this dismantling, and transports). Recommendations are formulated for a rewriting of the provided documents

  6. Spatial assessment of potential ecological risk of heavy metals in soils from informal e-waste recycling in Ghana

    Directory of Open Access Journals (Sweden)

    Vincent Nartey Kyere

    2017-10-01

    Full Text Available The rapidly increasing annual global volume of e-waste, and of its inherently valuable fraction, has created an opportunity for individuals in Agbogbloshie, Accra, Ghana to make a living by using unconventional, uncontrolled, primitive and crude procedures to recycle and recover valuable metals from this waste. The current form of recycling procedures releases hazardous fractions, such as heavy metals, into the soil, posing a significant risk to the environment and human health. Using a handheld global positioning system, 132 soil samples based on 100 m grid intervals were collected and analysed for cadmium (Cd, chromium (Cr, copper (Cu, mercury (Hg, lead (Pb and zinc (Zn. Using geostatistical techniques and sediment quality guidelines, this research seeks to assess the potential risk these heavy metals posed to the proposed Korle Ecological Restoration Zone by informal e-waste processing site in Agbogbloshie, Accra, Ghana. Analysis of heavy metals revealed concentrations exceeded the regulatory limits of both Dutch and Canadian soil quality and guidance values, and that the ecological risk posed by the heavy metals extended beyond the main burning and dismantling sites of the informal recyclers to the school, residential, recreational, clinic, farm and worship areas. The heavy metals Cr, Cu, Pb and Zn had normal distribution, spatial variability, and spatial autocorrelation. Further analysis revealed the decreasing order of toxicity, Hg>Cd>Pb> Cu>Zn>Cr, of contributing significantly to the potential ecological risk in the study area.

  7. Health risk assessment of lead for children in tinfoil manufacturing and e-waste recycling areas of Zhejiang Province, China

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Xiaofeng [Zhejiang Provincial Center for Disease Control and Prevention, 630 Xin Cheng Road, Binjiang District, Hangzhou 310051 (China); Centre for Environment and Population Health, Griffith School of Environment, Griffith University, 170 Kessels Road, Nathan, QLD 4111 (Australia); Miller, Greg [Centre for Environment and Population Health, Griffith School of Environment, Griffith University, 170 Kessels Road, Nathan, QLD 4111 (Australia); Ding, Gangqiang; Lou, Xiaoming; Cai, Delei; Chen, Zhijian; Meng, Jia; Tang, Jun [Zhejiang Provincial Center for Disease Control and Prevention, 630 Xin Cheng Road, Binjiang District, Hangzhou 310051 (China); Chu, Cordia [Centre for Environment and Population Health, Griffith School of Environment, Griffith University, 170 Kessels Road, Nathan, QLD 4111 (Australia); Mo, Zhe; Han, Jianlong [Zhejiang Provincial Center for Disease Control and Prevention, 630 Xin Cheng Road, Binjiang District, Hangzhou 310051 (China)

    2012-06-01

    Tinfoil manufacturing and electronic waste (e-waste) recycling remain rudimentary processes in Zhejing Province, China, which could account for elevated blood lead levels (BLLs) and health impacts on children. We assessed the potential health risks of lead in tinfoil manufacturing and e-waste recycling areas. 329 children in total aged 11-12 who lived in a tinfoil manufacturing area (Lanxi), an e-waste recycling area (Luqiao) and a reference area (Chun'an) were studied. Lead levels in children's blood were determined by inductively coupled plasma mass spectrometer (ICP-MS). Blood urea nitrogen (BUN), serum creatinine, serum calcium, {delta}-Aminolaevulinic acid ({delta}-ALA) and intelligence quotient (IQ) were also measured. Geometric mean of BLLs in Lanxi, Luqiao and Chun'an were 8.11 {mu}g/dL, 6.97 {mu}g/dL, and 2.78 {mu}g/dL respectively, with 35.1%, 38.9% and 0% of children who had BLLs above 10 {mu}g/dL. The BLLs in exposed areas were much higher than those in the control area. Lanxi children had higher creatinine and calcium than Chun'an children, and Luqiao children had higher {delta}-ALA and lower calcium than Chun'an children. No significant differences of IQ were observed between Lanxi, Luqiao and Chun'an, however a negative relationship between BLLs and IQ was shown for the study children. The results indicated that lead pollution from e-waste recycling and tinfoil processing appears to be a potential serious threat to children's health. - Highlights: Black-Right-Pointing-Pointer No report on tinfoil processing impact on children's health before. Black-Right-Pointing-Pointer Few studies reported health impacts of lead from e-waste processing. Black-Right-Pointing-Pointer Children with blood lead levels < 10 {mu}g/dL are associated with a decrease in IQ. Black-Right-Pointing-Pointer Threshold appears to exist at blood lead level of about 20 {mu}g/dL for urinary {delta}-ALA.

  8. Health risk assessment of lead for children in tinfoil manufacturing and e-waste recycling areas of Zhejiang Province, China

    International Nuclear Information System (INIS)

    Wang, Xiaofeng; Miller, Greg; Ding, Gangqiang; Lou, Xiaoming; Cai, Delei; Chen, Zhijian; Meng, Jia; Tang, Jun; Chu, Cordia; Mo, Zhe; Han, Jianlong

    2012-01-01

    Tinfoil manufacturing and electronic waste (e-waste) recycling remain rudimentary processes in Zhejing Province, China, which could account for elevated blood lead levels (BLLs) and health impacts on children. We assessed the potential health risks of lead in tinfoil manufacturing and e-waste recycling areas. 329 children in total aged 11–12 who lived in a tinfoil manufacturing area (Lanxi), an e-waste recycling area (Luqiao) and a reference area (Chun'an) were studied. Lead levels in children's blood were determined by inductively coupled plasma mass spectrometer (ICP-MS). Blood urea nitrogen (BUN), serum creatinine, serum calcium, δ-Aminolaevulinic acid (δ-ALA) and intelligence quotient (IQ) were also measured. Geometric mean of BLLs in Lanxi, Luqiao and Chun'an were 8.11 μg/dL, 6.97 μg/dL, and 2.78 μg/dL respectively, with 35.1%, 38.9% and 0% of children who had BLLs above 10 μg/dL. The BLLs in exposed areas were much higher than those in the control area. Lanxi children had higher creatinine and calcium than Chun'an children, and Luqiao children had higher δ-ALA and lower calcium than Chun'an children. No significant differences of IQ were observed between Lanxi, Luqiao and Chun'an, however a negative relationship between BLLs and IQ was shown for the study children. The results indicated that lead pollution from e-waste recycling and tinfoil processing appears to be a potential serious threat to children's health. - Highlights: ► No report on tinfoil processing impact on children's health before. ► Few studies reported health impacts of lead from e-waste processing. ► Children with blood lead levels < 10 μg/dL are associated with a decrease in IQ. ► Threshold appears to exist at blood lead level of about 20 μg/dL for urinary δ-ALA.

  9. Decontamination and dismantlement of the old hot laundry, CFA-669. Final report

    International Nuclear Information System (INIS)

    Smith, D.L.; Perry, E.F.

    1995-01-01

    This final report describes the decontamination and dismantlement (D ampersand D) of the old hot laundry, located at the Idaho National Engineering Laboratory (INEL) Central Facilities Area (CFA). The report describes the site before and after D ampersand D, processes used, cost and duration, and waste volume generated. In addition, lessons learned are presented. Pre-D ampersand D characterization indicated gross alpha concentrations in the building ranged from 6 to 310 pCi/g and gross beta measurements from 6 to 15,000 pCi/g. Gamma spectrum analysis identified cobalt-60, cesium-137, antimony-125, europium-152, europium-154, and niobium-94

  10. ''1995/2010: site drainage and nuclear facilities dismantling program'' result 2001

    International Nuclear Information System (INIS)

    2001-01-01

    A drainage and dismantling planing with the corresponding wastes management, has been decided for the CEA of Fontenay aux roses, in 1995. It will end in 2010. This document presents the main evolutions occurred since october 2000. (A.L.B.)

  11. Special Analysis for Disposal of High-Concentration I-129 Waste in the Intermediate-Level Vaults at the E-Area Low-Level Waste Facility

    Energy Technology Data Exchange (ETDEWEB)

    Collard, L.B.

    2000-09-26

    This revision was prepared to address comments from DOE-SR that arose following publication of revision 0. This Special Analysis (SA) addresses disposal of wastes with high concentrations of I-129 in the Intermediate-Level (IL) Vaults at the operating, low-level radioactive waste disposal facility (the E-Area Low-Level Waste Facility or LLWF) on the Savannah River Site (SRS). This SA provides limits for disposal in the IL Vaults of high-concentration I-129 wastes, including activated carbon beds from the Effluent Treatment Facility (ETF), based on their measured, waste-specific Kds.

  12. Special Analysis for Disposal of High-Concentration I-129 Waste in the Intermediate-Level Vaults at the E-Area Low-Level Waste Facility

    International Nuclear Information System (INIS)

    Collard, L.B.

    2000-01-01

    This revision was prepared to address comments from DOE-SR that arose following publication of revision 0. This Special Analysis (SA) addresses disposal of wastes with high concentrations of I-129 in the Intermediate-Level (IL) Vaults at the operating, low-level radioactive waste disposal facility (the E-Area Low-Level Waste Facility or LLWF) on the Savannah River Site (SRS). This SA provides limits for disposal in the IL Vaults of high-concentration I-129 wastes, including activated carbon beds from the Effluent Treatment Facility (ETF), based on their measured, waste-specific Kds

  13. Dismantling technologies trends

    International Nuclear Information System (INIS)

    Devaux, P.

    2009-01-01

    In this work dismantling technologies trends realized by the CEA are reviewed. There following technologies are presented: Data acquisition from facilities; Scenario studies; Remote handling and carriers; Dismantling techniques; Decontamination.

  14. Decommissioning and dismantling of the reprocessing plant Karlsruhe

    International Nuclear Information System (INIS)

    Eiben, K.; Fritz, P.

    1995-01-01

    Reprocessing activities were discontinued in late 1990. The facility was drained and rinsed, and 80 m3 of HLWC have since been stored in special tanks, awaiting vitrification. Decommissioning work is scheduled to proceed in six phases. The reprocessing areas of the facility will be prepared for release from radiological control and dismantled in the first phase. The remaining facilities can be deregulated, and storage tanks dismantled, only after termination of phase 1. The goal of the following phase is clearance from radiological control of all controlled areas, and the last phase is to cover dismantling of all buildings and restoration of a green field site. The overall costs of these activities are estimated to amount to DM 1.657 million. The article explains the contents of the first permits for decommissioning as well as the documents prepared for planning of work and licence application. (orig./HP) [de

  15. Characterization of brominated flame retardants from e-waste components in China.

    Science.gov (United States)

    Yu, Danfeng; Duan, Huabo; Song, Qingbin; Liu, Yicheng; Li, Ying; Li, Jinhui; Shen, Weijun; Luo, Jiahui; Wang, Jinben

    2017-10-01

    Many studies show that high levels of many toxic metals and persistent and bio-accumulative chemicals have been found in electronic waste (e-waste) dismantling sites and their surrounding environmental media. Both flame-retardant plastic housing materials and printed circuit boards (PCBs) could be the major contributors. However, relatively little work has focused on the use or content of toxic substances and their changing in scrap housing materials and PCBs from home appliances. This study evaluated the existence of brominated flame retardants (BFRs, including polybrominated diphenyl ethers (PBDEs) and Tetrabromobisphenol-A (TBBPA)) in housing plastics and PCBs from home appliances collected from various e-waste recyclers in China. These were then analyzed for the potential migration of BFRs from the e-waste components into their recycled products. The results show that both PBDEs and TBBPA were found with high level in most of e-waste samples, indicating that the widespread use of BFRs in home appliances are entering into the end-of-life stage. For the plastics samples, CRT TVs and LCD monitors should be given priority for the control of BFRs. Regarding PBDEs, the dominant congeners of BDE-209 in the plastics samples contributed 90.72-93.54% to the total concentrations of PBDEs, yet there are large variations for PCBs samples: BDE-28, -47, -99, and -153 were also important congeners compositions, except for BDE-209. Compared with previous studies, the BFRs concentrations in current Chinese e-waste are trending to decline. This study also found that BFRs in housing plastics and PCBs will be transferred into the recycled products with other purpose use, and the new products could have highly enriched capacities for BFRs. The obtained results could be helpful to manage e-waste and their components properly in order to minimize associated environmental and health risks of BFRs, particularly for their further reuse. Copyright © 2017 Elsevier Ltd. All rights reserved.

  16. Environmental Assessment for decontamination and dismantlement, Pinellas Plant

    International Nuclear Information System (INIS)

    1995-06-01

    The US Department of Energy (DOE) has prepared an Environmental Assessment (EA) (DOE/EA-1092) of the proposed decontamination and dismantlement of the Pinellas Plant in Largo, Florida. Under the Decontamination and Dismantlement EA, the DOE proposes to clean up facilities, structures, and utilities; dismantle specific structures; and mitigate or eliminate any environmental impacts associated with the cleanup, dismantlement, and related activities. Related activities include utilization of specific areas by new tenants prior to full-scale cleanup. Based on the analyses in the EA, the DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969. Therefore, the preparation of an environmental impact statement is not required. This report contains the Environmental Assessment, as well as the Finding of No Significant Impact (FONSI)

  17. Waste inventory, waste characteristics and waste repositories in Japan

    International Nuclear Information System (INIS)

    Shimooka, K.

    1997-01-01

    There are two types of repositories for the low level radioactive wastes in Japan. One is a trench type repository only for concrete debris generated from the dismantling of the research reactor. According to the safety assurance system, Japan Atomic Energy Research Institute (JAERI) has disposed of the concrete debris arose from the dismantling of the Japan Power Demonstration Reactor (JPDR). The other type is the concreted pit with engineered barriers. Rokkasho Low Level Radioactive Waste Disposal Center has this type of repository mainly for the power plant wastes. Japan Nuclear Fuel Ltd. (JNFL) established by electric power companies is the operator of the LLW disposal project. JNFL began the storage operation in 1992 and buried approximately 60,000 drums there. Two hundred thousand drums of uniformly solidified, waste may be buried ultimately. 4 refs, 3 tabs

  18. Decommissioning of the AVR reactor, concept for the total dismantling

    International Nuclear Information System (INIS)

    Marnet, C.; Wimmers, M.; Birkhold, U.

    1998-01-01

    After more than 21 years of operation, the 15 MWe AVR experimental nuclear power plant with pebble bed high temperature gas-cooled reactor was shout down in 1988. Safestore decommissioning began in 1994. In order to completely dismantle the plant, a concept for Continued dismantling was developed according to which the plant could be dismantled in a step-wise procedure. After each step, there is the possibility to transform the plant into a new state of safe enclosure. The continued dismantling comprises three further steps following Safestore decommissioning: 1. Dismantling the reactor vessels with internals; 2. Dismantling the containment and the auxiliary units; 3. Gauging the buildings to radiation limit, release from the validity range of the AtG (Nuclear Act), and demolition of the buildings. For these steps, various technical procedures and concepts were developed, resulting in a reference concept in which the containment will essentially remain intact (in-situ concept). Over the top of the outer reactor vessel a disassembling area for remotely controlled tools will be erected that tightens on that vessel and can move down on the vessel according to the dismantling progress. (author)

  19. On-site disposal of decontaminated and dismantled (D and D) materials: A management approach

    International Nuclear Information System (INIS)

    Hall, J.S.; Davis, M.J.; Picel, K.C.

    1995-01-01

    The Fernald Environmental Management Project (FEMP) is a federal facility located near Cincinnati, Ohio that is being remediated. Operable Unit 3 (OU3) of the FEMP consists of 232 buildings and other structures that formerly housed various uranium and thorium metallurgical and chemical processes. The buildings are constructed primarily of steel and concrete, with transite siding. The structures are being decontaminated and dismantled using an interim remedial action approach. The disposition of the debris and other waste materials generated by the interim action is being addressed by the final remedial action for the operable unit. The preferred alternative is disposal of most of the material in an engineered disposal cell located on the FEMP property. This is complicated by the fact that the FEMP is located in an environmentally sensitive area and by the complex nature of the materials. The principal aquifer located beneath the site, the Great Miami Aquifer, is designated as a sole-source aquifer under the Safe Drinking Water Act. Disposal of any wastes at the FEMP must be protective of the aquifer. Dismantlement of OU3 structures will result in a very heterogeneous waste stream, both in terms of types of materials and levels of contamination. Wastes to be managed also include contaminated production equipment and drummed materials associated with former production activities, as well as structural materials. All of these factors complicate the management of OU3 materials. This paper discusses the approach proposed by the FEMP for the management of materials resulting from the interim remedial action. The components of the management approach being used to address disposal of the heterogeneous wastes from OU3 in an environmentally sensitive manner are discussed, followed by some conclusions

  20. The Pierrelatte's military factories dismantling

    International Nuclear Information System (INIS)

    Bourrelier, P.; Kassel, Ch.

    1999-01-01

    The site of Pierrelatte in France, receives since 1958 gaseous diffusion plants assigned to the uranium enrichment for military uses. Since 1996 Cogema implements, by order of the Cea, a dismantling operation of the site. The operation which will begin in 2000, is going to last ten years. This project shows difficulties that make it innovative. Its originality, the planning, the risks, the program progressing and the regulation aspects are detailed in this paper. Beyond the complicated technical operations, the wastes management is of primary importance for the good development of the operations. (A.L.B.)

  1. Experience with Dismantling of the Analytic Cell in the JRTF Decommissioning Program

    International Nuclear Information System (INIS)

    Annoh, Akio; Nemoto, Koichi; Tajiri, Hideo; Saito, Keiichiro; Miyajima, Kazutoshi; Myodo, Masato

    2003-01-01

    The analytic cell was mainly used for process control analysis of the reprocessing process and for the measurement of fuel burn up ratio in JAERI's Reprocessing Test Facility (JRTF). The analytic cell was a heavy shielded one and equipped with a conveyor. The cell was alpha and beta(gamma)contaminated. For dismantling of analytic cells, it is very important to establish a method to remove the heavy shield safely and reduce the exposure. At first, a green house was set up to prevent the spread out of contamination, and next, the analytic cell was dismantled. Depending on the contamination condition, the workers wore protective suits such as air ventilated-suits for prevention of internal exposure and vinyl chloride aprons, lead aprons in order to reduce external exposure. From the work carried out, various data such as needed manpower for the activities, the collective dose of workers by external exposure, the amount of radioactive wastes and the relation between the weight of the shield and its dismantling efficiency were obtained and input for the database. The method of dismantling and the experience with the dismantling of the analytic cell in the JRTF, carried out during 2001 and 2002, are described in this paper

  2. Taking into account of dismantling constraints in the design of nuclear facilities

    International Nuclear Information System (INIS)

    Gouhier, E.; Moitrier, C.; Girones, P.; Pitrou, Y.; Poncet, P.; O'Sullivan, P.

    2014-01-01

    The taking into account of dismantling constraints in the design of nuclear facilities allows the reduction of the dosimetry during the dismantling operations, the reduction of the amount of wastes to manage and the saving of time and money by foreseeing an adequate and simple solution for each component. It is to notice that the strategy of life-extension strengthens that of dismantling because life-extension implies the possibility for any component of the reactor except the pressure vessel to be replaced. The feedback experience capitalized on various types of nuclear facilities have enabled IAEA and OECD to publish recommendations to facilitate dismantling. For instance, pipes and ventilation ducts must be designed to minimize the deposit of dust and residues, the natural porosity of concrete must be limited through the use of polishing products or a metal liner, the type and concentrations of impurities present in the structure materials must be controlled to limit radioactivation, the documentation describing the facility must be kept up to date, or the history of contamination events must be recorded all along the life of the facility. The integration of the dismantling constraints in the design stage is illustrated with 3 examples: the Georges Besse 2 enrichment fuel plant, new reactors (EPR, ASTRID and RJH), and ITER. (A.C.)

  3. Low-level Radioactive waste Management

    International Nuclear Information System (INIS)

    1991-01-01

    This meeting describes low-level radioactive waste management problems and contains 8 papers: 1 Low-level radioactive waste management: exemption concept and criteria used by international organizations. 2 Low-level radioactive waste management: french and foreign regulations 3 Low-level radioactive waste management in EDF nuclear power plants (FRANCE) 4 Low-level radioactive waste management in COGEMA (FRANCE) 5 Importance of low-level radioactive wastes in dismantling strategy in CEA (FRANCE) 6 Low-level radioactive waste management in hospitals 7 Low-level radioactive waste disposal: radiation protection laws 8 Methods of low-level radioactive materials measurements during reactor dismantling or nuclear facilities demolition (FRANCE)

  4. Experience acquired by EDF in implementation of its dismantling programme

    Energy Technology Data Exchange (ETDEWEB)

    Klaeyle, S.; Dalmas, R.; Davoust, M. [EDF - Centre d' Ingenerie Deconstruction Environnement (CIDEN), 69 - Villeurbanne (France)

    2008-07-01

    EDF decided in 2001 to implement immediate dismantling of its first generation nuclear plants. Seven years after this decision, the physical progress of the programme is 24% and is due to reach 50 % by 2013. This paper presents the experiences acquired in the fields of organization, project and programme management, purchasing strategies and waste management. Until now, the principal works involve Brennilis (Heavy water), ChoozA (PWR) and Creys Malville (fast breeder reactor). The detailed pre-project concerning the first of the six gas graphite reactors is complete and the call for bids process has been launched. The organization to manage projects, established at the De-construction and Environment Engineering Center (CIDEN), is effective and productive. Estimates of costs and expenses are coherent, which makes the forecasts put together to finance the programme secure. CIDEN has carried out significant engineering work over the last six years, making it possible to apply for the administrative authorizations which have now been obtained or are in the process of being obtained. Technical specifications are prepared at an optimized level of detail according to a contractual policy adapted to the complexity of the operations and the sharing of risk with manufacturers. The ChoozA contractualization process has been launched and the first dismantling work has begun in the nuclear auxiliary part. The main Brennilis contract will be completed in mid- 2008 and dismantling works will restart after renewal of the decree which was cancelled in mid-2007. Treatment of sodium from Creys Malville is about to begin, leading to elimination of the sodium risk by 2013. The very low activity waste (TFA) and low to medium activity waste (FA-MA) removal chains are operational. The intermediate activity/long lived (MA-VL) waste will be stored in a facility which will be brought into operational service in 2012. The graphite storage center is due to open between 2017 and 2019

  5. The Superphenix dismantling

    International Nuclear Information System (INIS)

    Carle, R.

    1999-01-01

    This document presents selected abstracts of Remy Carle's presentation on the dismantling of Superphenix (october 1998). The author wonders about the consequences of such a decision. After a chronological account of this fast reactor project, its cost and the scientific and technical contribution, the dismantling problem is considered. For EDF (Electricite De France) the dismantling dimension is considered at the same time of the design. The main problem is the liquid sodium reprocessing: a technical but also a financing problem. The end of the speech deals with the political aspects of Superphenix and the relations with the public. (A.L.B.)

  6. Dismantling of nuclear facilities: the industrial know-how; Demantelement des installations nucleaires: les voies de la maitrise industrielle

    Energy Technology Data Exchange (ETDEWEB)

    Lellament, R. [Societe Francaise d' Energie Nucleaire (SFEN), Groupe de Reflexion Energie/Environnement, 75 - Paris (France)

    2004-11-01

    Numerous nuclear facilities in laboratories or research reactors have been decommissioned and dismantled over the 2 last decades throughout the world. The valuable feedback experience has allowed nuclear industry to design, upgrade and test specific techniques for dismantling. These techniques are efficient although they have been validated on a reduced number of nuclear power plants. In France only 3 power units have been dismantled: Chinon A1, A2 and Brennilis (EL4) and they are not representative of the real park of EDF'reactors. 6 PWR-type reactors have already been dismantled in the Usa. The results of a survey concerning 26 countries shows that the dismantling cost is around 320 dollars/kWe, it represents 15% of the construction cost which is far from being excessive as it is often read in the media. The dismantling costs can be broken into: - de-construction (25-55%), - wastes from dismantling (17-43%), - security and monitoring (8-13%), - site reclamation (5-13%), and - engineering and project management (5-24%). (A.C.)

  7. NEA's analysis of the needs in innovation and research in the domain of dismantling

    International Nuclear Information System (INIS)

    Laurent, G.

    2014-01-01

    Today's approach of the dismantling of nuclear facilities is labour intensive and consequently very expensive. NEA's study suggests that research works should be done to find more efficient technologies for decontamination and dismantling. 5 lines of research have been identified by NEA. First, new technologies must be found to get a more accurate spatial distribution of contaminants. Secondly, the different cutting methods must be assessed in terms of efficiency, dosimetry and secondary waste generation. Thirdly, a better understanding of the chemical and physical processes that may be used for the decontamination of metals, concretes, underground water and soil. Fourthly, the management of radioactive waste implies to know the interaction between wastes and packages over a very long period. Fifthly, an accurate characterization of a complex site housing various contaminating sources and different hydro-geological conditions implies the development of 3-dimensional radiation transport codes and the use of innovative means like satellite monitoring. (A.C.)

  8. The Dismantling of Nuclear Installations in France

    International Nuclear Information System (INIS)

    Bonnaure, P.

    2011-01-01

    As we saw in the previous article by Pierre Bonnaure, though it has long been decried for the dangers inherent in its production structures and the very long-lived waste that it generates, nuclear power may yet recover its credibility, particularly in France. However, on close examination, we see that the nuclear industry is beset by a number of unresolved questions, beginning with the dismantling of installations that have become obsolete or are set to become so. Nuclear power took off after the Second World War, but several generations of technology have been developed since then, and most currently functioning power-stations - mainly second-generation installations - are theoretically nearing the end of their useful lives, at least in terms of what was said when they were being built. The problem therefore arises of their dismantling and the clean-up of the sites on which they were built, a thorny question on which Pierre Bonnaure casts light in this article (prospects, strategies, financing, management of waste etc.). Unfortunately, it emerges that in France nothing has really been resolved, that public debate on the matter is decidedly limited and that investment (both financial investment and research) is not commensurate with the needs of a sector which is, after all, the source of three quarters of national electricity production. (author)

  9. Cost Savings through Innovation in Decontamination, Decommissioning, and Dismantlement

    International Nuclear Information System (INIS)

    Yancey, Neal A.

    2003-01-01

    The United States Department of Energy (DOE) continually seeks safer and more cost effective technologies for the decontamination and decommissioning (D and D) of nuclear facilities. The Deactivation and Decommissioning Focus Area (DDFA) of the DOE's Office of Science and Technology (OST) sponsored large-scale demonstration and deployment projects (LSDDPs) to help bring new technologies into the D and D programs. The Idaho National Engineering and Environmental Laboratory (INEEL) LSDDP generated a list of needs defining specific problems where improved technologies could be incorporated into ongoing D and D tasks. The needs fell into 5 major categories--characterization, dismantlement, safety, material dispositioning, and decontamination. Technologies were carefully selected that provide a large benefit for a small investment. The technologies must provide significant improvements in cost, safety, radiation exposure, waste volume reduction, or schedule savings and widely applicable throughout the DOE complex. The LSDDP project provided training for the new technologies and worked with technology suppliers to resolve any questions that arose. Since 1998, 26 technologies have been demonstrated or deployed through the LSDDP for the D and D program at the INEEL. Of the 26 demonstrated and deployed technologies, 14 were in characterization, 3 were in decontamination, 4 were in dismantlement, 3 were in safety, and 2 were in material dispositioning. To promote the use of these technologies at other sites within the DOE complex, the LSDDP team published fact sheets, videos, technology summary reports, articles in INEEL star newspaper, posters, and maintained an internet home page on the project. As a result, additional deployments have taken place at the Hanford, Mound, Fernald, Oak Ridge, Ashtabula, and West Valley. Eight of the 26 technologies evaluated were developed in foreign countries. The technologies demonstrated have been shown to be faster, less expensive, and

  10. Increased memory T cell populations in Pb-exposed children from an e-waste-recycling area

    NARCIS (Netherlands)

    Cao, Junjun; Xu, Xijin; Zhang, Yu; Zeng, Zhijun; Hylkema, Machteld N; Huo, Xia

    Chronic exposure to heavy metals could affect cell-mediated immunity. The aim of this study was to explore the status of memory T cell development in preschool children from an e-waste recycling area. Blood lead (Pb) levels, peripheral T cell subpopulations, and serum levels of cytokines

  11. Dismantling the nuclear research reactor Thetis

    Energy Technology Data Exchange (ETDEWEB)

    Michiels, P. [Belgoprocess, 2480 Dessel (Belgium)

    2013-07-01

    The research reactor Thetis, in service since 1967 and stopped in 2003, is part of the laboratories of the institution of nuclear science of the University of Ghent. The reactor, of the pool-type, was used as a neutron-source for the production of radio-isotopes and for activation analyses. The reactor is situated in a water pool with inner diameter of 3 m. and a depth of 7.5 m. The reactor core is situated 5.3 m under water level. Besides the reactor, the pool contains pneumatic loops, handling tools, graphite blocks for neutron moderation and other experimental equipment. The building houses storage rooms for fissile material and sources, a pneumatic circuit for transportation of samples, primary and secondary cooling circuits, water cleaning resin circuits, a ventilation system and other necessary devices. Because of the experimental character of the reactor, laboratories with glove boxes and other tools were needed and are included in the dismantling program. The building is in 3 levels with a crawl-space. The ground-floor contains the ventilation installation, the purification circuits with tanks, cooling circuits and pneumatic transport system. On the first floor, around the reactor hall, the control-room, visiting area, end-station for pneumatic transport, waste-storage room, fuel storage room and the labs are located. The second floor contains a few laboratories and end stations of the two high speed transfer tubes. The lowest level of the pool is situated under ground level. The reactor has been operated at a power of 150 kW and had a max operating power of 250 kW. Belgoprocess has been selected to decommission the reactor, the labs, storage halls and associated circuits to free release the building for conventional reuse and for the removal of all its internals as legal defined. Besides the dose-rate risk and contamination risk, there is also an asbestos risk of contamination. During construction of the installation, asbestos-containing materials were

  12. Control of E.L.4. dismantling products

    International Nuclear Information System (INIS)

    Rotelle, O.; Dionisio Gomes, A.; Pinaux, M.

    1998-01-01

    Te Brennilis power plant ( a 70 MW heavy water moderated reactor, cooled with Co2) was shut down in July 1985, after 18 years of service. The fuel elements and the heavy water were transferred to facilities for treatment and temporary storage. The second phase of the Brennilis power plant de-construction began in September 1997. Except for the reactor building, the concrete structures will be drained and demolished after inspection and declassification. In the reactor building, only the heavy water circuits will be disassembled. Once this operation has been carried out, new work will be started to provide reactor containment and monitoring. Two types of wastes are produced by the de-construction operations (concrete, steel, nonferrous metals, electrical wiring, insulation, filters, technological wastes): low activity:medium activity wastes, i;e; stored on the surface after being treated and packaged; for very low activity wastes, two possibilities are under consideration: creation of a dedicated surface storage facility and recycling through approved channels. (N.C.)

  13. Dismantling and decontamination of Piver prototype vitrification plant

    International Nuclear Information System (INIS)

    Jouan, A.; Roudil, S.; Thomas, F.

    1991-01-01

    The PIVER prototype was targeted for dismantling in order to install a new pilot facility for the french continuous vitrification process. Most of the work involved the vitrification cell containing the process equipments, which had to be cleared out and thoroughly decontaminated; this implied disassembling, cutting up, conditioning and removing all the equipment installed in the cell. Remote manipulation, handling and cutting devices were used and some prior modifications were implemented in the cell environment. The dismantling procedure was conducted under a detailed programme defining the methodology for each operation. After equipment items and active zones were identified, the waste materials were removed, and several liquid decontamination operations were implemented. Removed activity, levels of irradiation in the cell and doses integrated by personnel were monitored to control progress and to adapt procedures to the conditions encountered. At the end of December 1989, the PIVER cleanup programme was at 87% complete and the total activity removed was 2.11 X 10 14 Bq (5712 Ci). The objective now is to obtain suitable working conditions in order to allow operators to enter the cell to remove items that are inaccessible or which cannot be dismantled by remote manipulators and to complete the decontamination procedure

  14. Preliminary investigation of the 317 Area, ANL-E

    International Nuclear Information System (INIS)

    Wescott, J.; Moos, L.; Remeikis, A.

    1995-01-01

    The 317 Area at Argonne National Laboratory-East (ANL-E) is scheduled to undergo a Resource Conservation and Recovery Act (RCRA) Facility Investigation, Act or RFI. Prior to the formal RFI, a voluntary, preliminary characterization of the 317 Area was conducted by ANL-E. The characterization results were used to formulate the RFI work plan and provided a better focus for the formal investigation. This site presents a difficult engineering challenge. The nature of the waste disposed at this site in the past includes both liquid chemicals and radioactive waste. The 317 Area is classified as a radiologically controlled area because of operations currently performed there. Present Department of Energy policy stipulates that waste material from such an area must be considered radioactive. The possible presence of hazardous constituents in the soil and groundwater would require the investigation-derived waste generated at the site be disposed as radioactive mixed waste. Besides the nature of the waste possibly contaminating this site, the geology of the site poses an equally enigmatic situation. The ANL-E site is located in a region of recessional glacial moraine deposits

  15. Provisions for the dismantling of nuclear facilities are sufficient

    International Nuclear Information System (INIS)

    Le Ngoc, B.

    2016-01-01

    The European Union has assessed the provisions made by the nuclear plant operators to face the future costs of dismantling. The United-Kingdom and the Netherlands are the single E.U. members to have provisions covering the whole of the expenses (respectively 100% and 94%). The figure for France is very low 33% (far below the European average of 56%). According to French authorities the provisions for the dismantling of nuclear facilities are strictly defined by law: they must be made progressively till the decommissioning and they must be composed by dedicated assets. The costs of the dismantling is regularly re-assessed for taking into account technological progress and changes in regulation. Furthermore the French system limits the period in which provisions are made to the initial operating life of the plant: mostly 40 years which is a prudent measure. In other E.U. members like Germany, the provisions are not covered by dedicated assets which might endanger the capacity of the operator to face the future costs. The progressiveness of the French systems of provision-making is fair because the dismantling costs are spread equally over the entire operating period of the facility. (A.C.)

  16. Safe dismantling of the SVAFO research reactors R2 and R2-0 in Sweden

    International Nuclear Information System (INIS)

    ARNOLD, Hans-Uwe; BROY, Yvonne; Dirk Schneider

    2017-01-01

    The R2 and R2-0 reactors were part of the Swedish government's research program on nuclear power from the early 1960's. Both reactors were shut down in 2005 following a decision by former operator Studsvik Nuclear AB. The decommissioning of the R2 and R2-0 reactors is divided into three phases. The first phase - awarded to AREVA - involved dismantling of the reactors and associated systems in the reactor pool, treatment of the disassembled components as well as draining, cleaning and emptying the pool. In the second phase, the pool structure itself will be dismantled, while removal of remaining reactor systems, treatment and disposal of materials and clean-up will be carried out in the third stage. The entire work is planned to be completed before the end of this decade. The paper describes the several steps of phase 1 - starting with the team building, followed by the dismantling operations and covers challenges encountered and lessons learned as well. The reactors consist of 5.400 kg aluminum, 6.000 kg stainless steel restraint structures as well as, connection elements of the mostly flanged components (1.000 kg). The most demanding - from a radiological point of view - was the R2-0 reactor that was limited to ∼ 1 m"3 construction volumes but with an extremely heterogeneous activation profile. Based on the calculated radiological entrance data and later sampling, nuclide vectors for both reactors depending on the real placement of the single component and on the material (aluminum and stainless steel) were created. Finally, for the highest activated component from R2 reactor, 85 Sv/h were measured. The dismantling principles - adopted on a safety point of view - were the following: The always protected base area of the ponds served as a flexible buffer area for waste components and packaging. Specific protections were also installed on the walls to protect them from mechanical stress which may occur during dismantling work. A specific work platform was

  17. Chest circumference and birth weight are good predictors of lung function in preschool children from an e-waste recycling area.

    Science.gov (United States)

    Zeng, Xiang; Xu, Xijin; Zhang, Yuling; Li, Weiqiu; Huo, Xia

    2017-10-01

    The purpose of this study was to investigate the associations between birth weight, chest circumference, and lung function in preschool children from e-waste exposure area. A total of 206 preschool children from Guiyu (an e-waste recycling area) and Haojiang and Xiashan (the reference areas) in China were recruited and required to undergo physical examination, blood tests, and lung function tests during the study period. Birth outcome such as birth weight and birth height were obtained by questionnaire. Children living in the e-waste-exposed area have a lower birth weight, chest circumference, height, and lung function when compare to their peers from the reference areas (all p value <0.05). Both Spearman and partial correlation analyses showed that birth weight and chest circumference were positively correlated with lung function levels including forced vital capacity (FVC) and forced expiratory volume in 1 s (FEV 1 ). After adjustment for the potential confounders in further linear regression analyses, birth weight, and chest circumference were positively associated with lung function levels, respectively. Taken together, birth weight and chest circumference may be good predictors for lung function levels in preschool children.

  18. Digital Autoradiography as a novel complementary technique for the investigation of radioactive contamination in nuclear facilities under dismantlement

    International Nuclear Information System (INIS)

    Haudebourg, Raphael; Fichet, Pascal; Goutelard, Florence

    2015-01-01

    The detection (location and quantification) of nuclear facilities to be dismantled possible contamination with low-range particles emitters ( 3 H, other low-energy β emitters, a emitters) remains a tedious and expensive task. Indeed, usual remote counters show a too low sensitivity to these non-penetrating radiations, while conventional wipe tests are irrelevant for fixed radioactivity evaluation. The only method to accurately measure activity levels consists in sampling and running advanced laboratory analyses (spectroscopy, liquid scintillation counting, pyrolysis...). Such measurements generally induce sample preparation, waste production (destructive analyses, solvents), nuclear material transportation, long durations, and significant labor mobilization. Therefore, the search for the limitation of their number and cost easily conflicts with the necessity to perform a dense screening for sampling (to maximize the representativeness of the samples), in installations of thousands of square meters (floors, wells, ceilings), plus furniture, pipes, and other wastes. To overcome this contradiction, Digital Autoradiography (D. A.) was re-routed from bio molecular research to radiological mapping of nuclear installations under dismantling and to waste and sample analysis. After in-situ exposure to the possibly-contaminated areas to investigate, commercial reusable radiosensitive phosphor screens (of a few 100 cm 2 ) were scanned in the proper laboratory device and sharp quantitative images of the radioactivity could be obtained. The implementation of geostatistical tools in the data processing software enabled the exhaustive characterization of concrete floors at a rate of 2 weeks / 100 m 2 , at lowest costs. Various samples such as drilled cores, or tank and wood pieces, were also successfully evaluated with this method, for decisive results. Thanks to the accurate location of potential contamination spots, this approach ensures relevant and representative sampling

  19. Clearance of radioactive materials during reactor dismantling. Permanent enclosure instead of demolition and renaturation?; Freigabe radioaktiven Materials beim AKW-Abriss. Dauerhafter Einschluss statt Rueckbau?

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2016-07-01

    During reactor dismantling besides high-level radioactive wastes a large amount of low-level contaminated steel and concrete has to be disposed. In case that radioactivity falls below defined dose limits (10 micro Sv/person and year) these materials may be disposed in domestic waste landfill or in municipal incineration facilities. The issue is discussed in detail including the fact that many power plants are dismantled at the same time so that the contaminated materials might accumulate. Another issue is the occupational safety of contract workers during dismantling. The permanent enclosure could avoid this environmental contamination of decommissioned power plants might also be less expensive.

  20. Radioactive Waste Management and Environmental Contamination Issues at the Chernobyl Site

    International Nuclear Information System (INIS)

    Napier, Bruce A.; Schmieman, Eric A.; Voitsekhovitch, Oleg V.

    2007-01-01

    The destruction of the Unit 4 reactor at the Chernobyl Nuclear Power Plant resulted in the generation of radioactive contamination and radioactive waste at the site and in the surrounding area (referred to as the Exclusion Zone). In the course of remediation activities, large volumes of radioactive waste were generated and placed in temporary near surface waste-storage and disposal facilities. Trench and landfill type facilities were created from 1986 to 1987 in the Chernobyl Exclusion Zone at distances 0.5 to 15 km from the NPP site. This large number of facilities was established without proper design documentation, engineered barriers, or hydrogeological investigations and they do not meet contemporary waste-safety requirements. Immediately following the accident, a Shelter was constructed over the destroyed reactor; in addition to uncertainties in stability at the time of its construction, structural elements of the Shelter have degraded as a result of corrosion. The main potential hazard of the Shelter is a possible collapse of its top structures and release of radioactive dust into the environment. A New Safe Confinement (NSC) with a 100-years service life is planned to be built as a cover over the existing Shelter as a longer-term solution. The construction of the NSC will enable the dismantlement of the current Shelter, removal of highly radioactive, fuel-containing materials from Unit 4, and eventual decommissioning of the damaged reactor. More radioactive waste will be generated during NSC construction, possible Shelter dismantling, removal of fuel containing materials, and decommissioning of Unit 4. The future development of the Exclusion Zone depends on the future strategy for converting Unit 4 into an ecologically safe system, i.e., the development of the NSC, the dismantlement of the current Shelter, removal of fuel containing material, and eventual decommissioning of the accident site. To date, a broadly accepted strategy for radioactive waste

  1. Radioactive waste management and environmental contamination issues at the Chernobyl site.

    Science.gov (United States)

    Napier, B A; Schmieman, E A; Voitsekovitch, O

    2007-11-01

    The destruction of the Unit 4 reactor at the Chernobyl Nuclear Power Plant resulted in the generation of radioactive contamination and radioactive waste at the site and in the surrounding area (referred to as the Exclusion Zone). In the course of remediation activities, large volumes of radioactive waste were generated and placed in temporary near-surface waste storage and disposal facilities. Trench and landfill type facilities were created from 1986-1987 in the Chernobyl Exclusion Zone at distances 0.5-15 km from the nuclear power plant site. This large number of facilities was established without proper design documentation, engineered barriers, or hydrogeological investigations and they do not meet contemporary waste-safety requirements. Immediately following the accident, a Shelter was constructed over the destroyed reactor; in addition to uncertainties in stability at the time of its construction, structural elements of the Shelter have degraded as a result of corrosion. The main potential hazard of the Shelter is a possible collapse of its top structures and release of radioactive dust into the environment. A New Safe Confinement (NSC) with a 100 y service life is planned to be built as a cover over the existing Shelter as a longer-term solution. The construction of the NSC will enable the dismantlement of the current Shelter, removal of highly radioactive, fuel-containing materials from Unit 4, and eventual decommissioning of the damaged reactor. More radioactive waste will be generated during NSC construction, possible Shelter dismantling, removal of fuel-containing materials, and decommissioning of Unit 4. The future development of the Exclusion Zone depends on the future strategy for converting Unit 4 into an ecologically safe system, i.e., the development of the NSC, the dismantlement of the current Shelter, removal of fuel-containing material, and eventual decommissioning of the accident site. To date, a broadly accepted strategy for radioactive waste

  2. Polychlorinated biphenyls (PCBs) in the frame of the dismantling of nuclear facilities

    International Nuclear Information System (INIS)

    Hagenbart, Lars; Held, Christian; Reichert, Alexander

    2013-01-01

    During construction and maintenance of nuclear facilities PCB (polychlorinated biphenyls) containing paints were used in a large extent in the past. The WAK dismantling and disposal Company has dismantles such facilities and identified the PCB in the buildings. Besides the radionuclides the conventional hazardous material group of the PCBs has also to be disposed. The respective legal regulations have to be considered. In the frame of the contribution the radiological release of building structures with respect to re-use or demolition and residual PCB containing materials is discussed. The radiological disposal in final repositories and the conventional disposal regulations for releasable residual wastes are reported.

  3. Spatial characteristics of cadmium in topsoils in a typical e-waste recycling area in southeast China and its potential threat to shallow groundwater

    Energy Technology Data Exchange (ETDEWEB)

    Wu, Chunfa, E-mail: wchf1680@sina.com [Department of Agricultural Resources and Environment, Nanjing University of Information Science and Technology, 219 Ningliu Road, Nanjing 210044 (China); Key Laboratory of Soil Environment and Pollution Remediation, Institute of Soil Science, Chinese Academy of Sciences, 71 East Beijing Road, Nanjing 210008 (China); Luo, Yongming [Key Laboratory of Soil Environment and Pollution Remediation, Institute of Soil Science, Chinese Academy of Sciences, 71 East Beijing Road, Nanjing 210008 (China); Yantai Institute of Coastal Zone Research, Chinese Academy of Sciences, 17 Chunhui Rd, Yantai 264003 (China); Deng, Shaopo; Teng, Ying; Song, Jing [Key Laboratory of Soil Environment and Pollution Remediation, Institute of Soil Science, Chinese Academy of Sciences, 71 East Beijing Road, Nanjing 210008 (China)

    2014-02-01

    Informal electrical and electronic waste (e-waste) recycling often creates secondary sources of cadmium (Cd) pollution. To characterize the total Cd concentration (Cd{sub total}) in topsoil and evaluate the threat of Cd in topsoils to shallow groundwater, 187 topsoil samples and 12 shallow groundwater samples were collected in a typical e-waste recycling area in southeast China. Soil organic matter content, soil pH and Cd{sub total} in topsoil, pH and dissolved Cd concentration in shallow groundwater were measured. Cd{sub total} in the topsoils showed an inverse distribution trend with soil pH in that high Cd concentrations (and low pH values) were found in the surrounding area of the metal recycling industrial park where there were many family-operated e-waste recycling facilities before the industrial park was established and with low concentrations (and high pH values) in other areas, and they had similar spatial correlation structures. Cd accumulation and acidification were synchronous in topsoils, and soil pH was significantly correlated with Cd{sub total} in topsoils with low to moderate negative correlation coefficient (r = − 0.24), indicating that both of them maybe correlated with informal recycling. The shallow groundwater in the surrounding area of the metal recycling industrial park was seriously contaminated by Cd, and topsoil Cd accumulation and acidification in the surrounding area of e-waste recycling sites significantly increase the risk of shallow groundwater contaminated by Cd. Action is urgently required to control Cd accumulation and acidification by improving the recycling operations of e-wastes in order to reduce the risk of Cd leaching from topsoils and shallow groundwater contamination. - Highlights: • We characterize the Cd{sub total} in topsoils, pH and SOM in a typical e-waste recycling area. • The relationships between Cd{sub total} in topsoils, pH, and SOM were studied. • Impact of topsoil Cd accumulation and acidification on

  4. Spatial characteristics of cadmium in topsoils in a typical e-waste recycling area in southeast China and its potential threat to shallow groundwater

    International Nuclear Information System (INIS)

    Wu, Chunfa; Luo, Yongming; Deng, Shaopo; Teng, Ying; Song, Jing

    2014-01-01

    Informal electrical and electronic waste (e-waste) recycling often creates secondary sources of cadmium (Cd) pollution. To characterize the total Cd concentration (Cd total ) in topsoil and evaluate the threat of Cd in topsoils to shallow groundwater, 187 topsoil samples and 12 shallow groundwater samples were collected in a typical e-waste recycling area in southeast China. Soil organic matter content, soil pH and Cd total in topsoil, pH and dissolved Cd concentration in shallow groundwater were measured. Cd total in the topsoils showed an inverse distribution trend with soil pH in that high Cd concentrations (and low pH values) were found in the surrounding area of the metal recycling industrial park where there were many family-operated e-waste recycling facilities before the industrial park was established and with low concentrations (and high pH values) in other areas, and they had similar spatial correlation structures. Cd accumulation and acidification were synchronous in topsoils, and soil pH was significantly correlated with Cd total in topsoils with low to moderate negative correlation coefficient (r = − 0.24), indicating that both of them maybe correlated with informal recycling. The shallow groundwater in the surrounding area of the metal recycling industrial park was seriously contaminated by Cd, and topsoil Cd accumulation and acidification in the surrounding area of e-waste recycling sites significantly increase the risk of shallow groundwater contaminated by Cd. Action is urgently required to control Cd accumulation and acidification by improving the recycling operations of e-wastes in order to reduce the risk of Cd leaching from topsoils and shallow groundwater contamination. - Highlights: • We characterize the Cd total in topsoils, pH and SOM in a typical e-waste recycling area. • The relationships between Cd total in topsoils, pH, and SOM were studied. • Impact of topsoil Cd accumulation and acidification on shallow groundwater quality

  5. LEP dismantling starts

    CERN Multimedia

    2000-01-01

    Since the end of November, various teams have been getting stuck into dismantling the LEP accelerator and its four experiments. After making the installations safe, the dismantling and removal of 40,000 tonnes of equipment is underway. Down in the tunnel, it is a solemn moment. It is 10 o'clock on 13 December and Daniel Regin, one of those heading the dismantling work, moves in on a magnet, armed with a hydraulic machine. Surrounded by teams gathered there for a course in dismantling, he makes the first cut into LEP. The great deconstruction has begun. In little over than a year, the accelerator will have been cleared away to make room for its successor, the LHC. The start of the operation goes back to 27 November. Because before setting about the machine with hydraulic shears and monkey wrenches, LEP had first to be made safe - it was important to make sure the machine could be taken apart without risk. All the SPS beam injection systems to LEP were cut off. The fluids used for cooling the magnets and superc...

  6. Implementation of the environmental management plan for the dismantling of nuclear powered submarines at Zvezdochka Shipyard, Russia

    International Nuclear Information System (INIS)

    Washer, M.; Cull, M.; Crocker, C.; Ivanov, V.; Shepurev, A.; Khan, B.U.Z.; Lee, M.; Gerchikov, M.

    2007-01-01

    Department of Foreign Affairs and International Trade Canada is funding the dismantling of twelve nuclear powered submarines (NPS) from the Russian Federation's Northern Fleet as part of the Global Partnership Initiative against weapons and materials of mass destruction. In this paper, work performed by Nuclear Safety Solutions Ltd. and its collaborators in support of these activities is described. First, an environmental impact assessment of towing and dismantling NPS in the Kola Peninsula, and the Barents and White Seas was performed. The assessed activities included: towing of NPS from Naval Bases in Murmansk Region to the Zvezdochka shipyard (Severodvinsk); defuelling of onboard reactors; dismantling of NPS at Zvezdochka; and waste management. The assessment helped identify mitigation measures that could prevent the occurrence of adverse effects. Next, the project team defined and implemented an environmental management plan (EMP) based on the shipyard's existing environmental policy and the mitigating measures identified during the environmental assessment. Specific targets were defined to track the progress of the EMP implementation, and are described in this paper. During the study period, three Victor Class NPS were dismantled at Zvezdochka. The major benefits realized include: removal and spent nuclear fuel assemblies; treatment/decontamination of liquid and solid radioactive waste; and the cultivation of collaboration between Russian and Western expertise. (author)

  7. Implementation of the environmental management plan for the dismantling of nuclear powered submarines at Zvezdochka shipyard, Russia

    International Nuclear Information System (INIS)

    Washer, M.; Cull, M.; Crocker, C.; Ivanov, V.; Shepurev, A.; Khan, B.U.Z.; Lee, M.; Gerchikov, M.

    2008-01-01

    Department of Foreign Affairs and International Trade Canada is funding the dismantling of twelve nuclear powered submarines (NPS) from the Russian Federation's Northern Fleet as part of the Global Partnership Initiative against weapons and materials of mass destruction. In this paper, work performed by Nuclear Safety Solutions Ltd. and its collaborators in support of these activities is described. First, an environmental impact assessment of towing and dismantling NPS in the Kola Peninsula, and the Barents and White Seas was performed. The assessed activities included: towing of NPS from Naval Bases in Murmansk Region to the Zvezdochka shipyard (Severodvinsk); defuelling of onboard reactors; dismantling of NPS at Zvezdochka; and waste management. The assessment helped identify mitigation measures that could prevent the occurrence of adverse effects. Next, the project team defined and implemented an environmental management plan (EMP) based on the shipyard's existing environmental policy and the mitigating measures identified during the environmental assessment. Specific targets were defined to track the progress of the EMP implementation, and are described in this paper. During the study period, three Victor Class NPS were dismantled at Zvezdochka. The major benefits realized include: removal of spent nuclear fuel assemblies; treatment/ decontamination of liquid and solid radioactive waste; and the cultivation of collaboration between Russian and Western expertise. (author)

  8. Large components dismantlement flow chart in the United States

    International Nuclear Information System (INIS)

    Szilagyi, Andrew

    2012-01-01

    The beginning steps are identical for large or regular components. The starting point of this flowchart assumes that it has already been determined the component has been categorized as waste. The first step is to make sure that all components are handled safely, that ALARA is followed, that any security concerns are managed, and that the dismantlement cost or any other cost is constantly reviewed. After this, the process knowledge and acceptable knowledge should be reviewed; this will help in the following step which is characterization with non-destructive assay. At this point, the project manager is presented with the first three alternatives which will determine the path to follow: Low level waste (LLW) disposal flowchart, part 1 to 3 , Transuranic waste (TRU) disposal flowchart, part 1 and 2 , or High level waste (HLW) disposal flowchart

  9. An approach to evaluate the cutting time for the nuclear dismantling simulation

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Jonghwan; Hyun, Dongjun; Kang, Sinyoung; Kim, Ikjune; Jeong, Kwan-Seong; Choi, Byung-Seon; Moon, Jeikwon [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2016-10-15

    Nuclear power plant (NPP) decommissioning involves various processes and technologies. Decommissioning should be performed after a comprehensive review of the information related to these processes and technologies. There are various means of prior examination and evaluation to ensure the feasibility and safety of the decommissioning process plan. Our dismantling simulation system aims to simulate and evaluate whole processes related to the dismantlement of core equipment of NPP such as the device preparation, cutting operation, waste transfer, and so on. This paper introduces the estimation methodology of the time required for the cutting processes based on real cutting conditions in order to provide effective economic evaluation functionalities used for the system. The methodology to estimate the time required for the remote cutting process in the nuclear dismantling simulation system was proposed. Among the factors which mainly determine the time, the cutting trace was directly calculated from the simulation system and the continuous cutting speed was obtained by proper order of the spline fitting with constraint conditions.

  10. Low-level radioactive wastes

    International Nuclear Information System (INIS)

    Garbay, H.; Chapuis, A.M.

    1988-01-01

    During dismantling operations of nuclear facilities radioctive and non radioactive wastes are produced. The distinction between both kinds of wastes is not easy. In each dismantling operation special care and rules are defined for the separation of wastes. Each case must be separately studied. The volume and the surface activites are analyzed. Part of the wastes had been disposed in a public environment. The regulations, the international recommendations, thetheoretical and experimental investigations in this field are presented. A regulation principle and examples of radioactivity limits, on the basis of international recommendations, are provided. Those limits are calculated from individual radiation dose that may reach human beings [fr

  11. Decommissioning and dismantling of nuclear and fuel cycle facilitites in Spain

    International Nuclear Information System (INIS)

    Gravalos, J.M.; Alamo, S.

    1992-01-01

    In the recent past, and as a consequence of a fire in the turbine island of the Vandellos I Graphite Gas type Nuclear Plant, which damaged the facility to a point that recovery was not judged economically feasible, the authorities decided on the final shutdown of the plant. Several studies were performed in order to select the dismantling strategy to be adopted. In spite of Valdellos I being the first commercial reactor to be decommissioned in Spain, several research reactors and fuel cycle facilities, which have reached the end of their commercial lives, are at present at different stages of their dismantling and decommissioning process as is described further. The development of an exemption policy for below regulatory concern wastes is considered a very significant issue regarding decommissioning as it has a large impact on radioactive waste volumes, and thus on costs. Aware of this problem ENRESA together with Spanish regulatory authorities are working in close cooperation with CEC research programs to complete the development of criteria and methodologies for the application of exemption practices in Spain

  12. Elevation of water table and various stratigraphic surfaces beneath e area low level waste disposal facility

    Energy Technology Data Exchange (ETDEWEB)

    Bagwell, Laura [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Bennett, Patti [; Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2017-11-02

    This memorandum describes work that supports revision of the Radiological Performance Assessment (PA) for the E Area Low Level Radioactive Waste Disposal Facility (LLRWDF). The work summarized here addresses portions of the PA Strategic Planning Team's recommendation #148b (Butcher and Phifer, 2016).

  13. Portrayals in Print: Media Depictions of the Informal Sector’s Involvement in Managing E-Waste in India

    Directory of Open Access Journals (Sweden)

    Verena Radulovic

    2018-03-01

    Full Text Available For over a decade, media stories have exposed health and environmental harm caused by informal electronics recycling in less industrialized countries. Greater awareness of these risks helped inform regulations across the globe and the development of recycling standards. Yet, media depictions also shape public perceptions of informal workers and their role in handling electronic waste, or e-waste. This paper examines how mainstream print media describes the informal sector’s involvement in handling e-waste in India, especially as policymakers and other stakeholders currently grapple with how to integrate informal workers into formal, more transparent e-waste management schemes. This study evaluates depictions of the informal sector in print articles from both non-Indian and Indian news media outlets, employing controversy mapping principles and digital research tools. Findings may help inform stakeholder agendas seeking to influence public awareness on how to integrate informal workers into viable e-waste management solutions. Subsequent research based on these results could also help stakeholders understand the actors and networks that shape such media depictions. Results from the dataset show that most news articles describe informal workers negatively or problematically due to activities causing health risks and environmental damage, but usually do not discern which activities in the value chain (e.g., collection, dismantling, metals extraction represent the greatest risks. Comparatively fewer articles portray informal workers positively or as contributing to e-waste solutions. Most articles also do not explain challenges that arise when working with informal workers. As such, media depictions today often lag behind policy debates and obscure multiple facets—good and bad—of the informal sector’s involvement in managing e-waste. Thus, an opportunity exists for policymakers, manufacturers, and advocacy groups to bridge the gap between

  14. Spatial characteristics of cadmium in topsoils in a typical e-waste recycling area in southeast China and its potential threat to shallow groundwater.

    Science.gov (United States)

    Wu, Chunfa; Luo, Yongming; Deng, Shaopo; Teng, Ying; Song, Jing

    2014-02-15

    Informal electrical and electronic waste (e-waste) recycling often creates secondary sources of cadmium (Cd) pollution. To characterize the total Cd concentration (Cdtotal) in topsoil and evaluate the threat of Cd in topsoils to shallow groundwater, 187 topsoil samples and 12 shallow groundwater samples were collected in a typical e-waste recycling area in southeast China. Soil organic matter content, soil pH and Cdtotal in topsoil, pH and dissolved Cd concentration in shallow groundwater were measured. Cdtotal in the topsoils showed an inverse distribution trend with soil pH in that high Cd concentrations (and low pH values) were found in the surrounding area of the metal recycling industrial park where there were many family-operated e-waste recycling facilities before the industrial park was established and with low concentrations (and high pH values) in other areas, and they had similar spatial correlation structures. Cd accumulation and acidification were synchronous in topsoils, and soil pH was significantly correlated with Cdtotal in topsoils with low to moderate negative correlation coefficient (r=-0.24), indicating that both of them maybe correlated with informal recycling. The shallow groundwater in the surrounding area of the metal recycling industrial park was seriously contaminated by Cd, and topsoil Cd accumulation and acidification in the surrounding area of e-waste recycling sites significantly increase the risk of shallow groundwater contaminated by Cd. Action is urgently required to control Cd accumulation and acidification by improving the recycling operations of e-wastes in order to reduce the risk of Cd leaching from topsoils and shallow groundwater contamination. Copyright © 2013. Published by Elsevier B.V.

  15. Dismantling system of concrete thermal shielding walls

    International Nuclear Information System (INIS)

    Machida, Nobuhiro; Saiki, Yoshikuni; Ono, Yorimasa; Tokioka, Masatake; Ogino, Nobuyuki.

    1985-01-01

    Purpose: To enable safety and efficient dismantling of concrete thermal shielding walls in nuclear reactors. Method: Concrete thermal shielding walls are cut and dismantled into dismantled blocks by a plasma cutting tool while sealing the top opening of bioshielding structures. The dismantled blocks are gripped and conveyed. The cutting tool is remote-handled while monitoring on a television receiver. Slugs and dusts produced by cutting are removed to recover. Since the dismantling work is carried out while sealing the working circumstance and by the remote control of the cutting tool, the operators' safety can be secured. Further, since the thermal sealing walls are cut and dismantled into blocks, dismantling work can be done efficiently. (Moriyama, K.)

  16. Decontamination and dismantlement of the building 594 waste ion exchange facility at Argonne National Laboratory-East project final report

    International Nuclear Information System (INIS)

    Wiese, E. C.

    1998-01-01

    The Building 594 D and D Project was directed toward the following goals: Removal of any radioactive and hazardous materials associated with the Waste Ion Exchange Facility; Decontamination of the Waste Ion Exchange Facility to unrestricted use levels; Demolition of Building 594; and Documentation of all project activities affecting quality (i.e., waste packaging, instrument calibration, audit results, and personnel exposure) These goals had been set in order to eliminate the radiological and hazardous safety concerns inherent in the Waste Ion Exchange Facility and to allow, upon completion of the project, unescorted and unmonitored access to the area. The ion exchange system and the resin contained in the system were the primary areas of concern, while the condition of the building which housed the system was of secondary concern. ANL-E health physics technicians characterized the Building 594 Waste Ion Exchange Facility in September 1996. The characterization identified a total of three radionuclides present in the Waste Ion Exchange Facility with a total activity of less than 5 microCi (175 kBq). The radionuclides of concern were Co 60 , Cs 137 , and Am 241 . The highest dose rates observed during the project were associated with the resin in the exchange vessels. DOE Order 5480.2A establishes the maximum whole body exposure for occupational workers at 5 rem (50 mSv)/yr; the administrative limit at ANL-E is 1 rem/yr (10 mSv/yr)

  17. Cleaning of dismantled metals by electropolishing

    International Nuclear Information System (INIS)

    Wei, T.Y.; Chung, Z.J.; Lu, D.L.; Hsieh, J.C.

    1995-01-01

    A project of cleaning dismantled metals is going on at INER. The test work has been performed. Results showed that the activity decreased from 45 microSv/h to background level after 20 minutes electrolytic polishing. These cleaned metals could be reused through melting and fabricating. These metals could also be classified as BRC waste to facilitate the waste management if they can pass the identification and be admitted by the government authority. In order to achieve the planned target, some electro-decontamination facilities have been established. An automatic electropolishing facility with six cells was designed to clean the contaminated metals in plate type with dimensions less than 50 cm x 50 cm. Another automatic electropolishing facility was specially designed for treating the contaminated pipes. In addition, mobile electropolishing facilities were also established for large pieces of metal and some fixed equipment. In this cleaning project, a practical recycling and treatment method for electrolyte has been developed in order to comply with the requirement of secondary waste minimization

  18. Days of dismantling activities of installations and rehabilitation of contaminated sites in France

    International Nuclear Information System (INIS)

    2008-01-01

    The objective of these days, organized by the section environment of the French society of radiation protection, is to present a panorama of the activities of nuclear installations dismantling and contaminated sites rehabilitation in France, by leaning in the same time on practical cases and by stating the French rule and the national and international recommendations on the subject. These days have also for object to approach the stakes associated with the sectors of waste management and the materials generated by these activities and in a more general way, the stakes to come for the different actors of the dismantling and the rehabilitation. (N.C.)

  19. State of dismantling of reactor facilities (JPDR) in Tokai Research Establishment, Japan Atomic Energy Research Institute (fiscal year 1986)

    International Nuclear Information System (INIS)

    1987-01-01

    As to this dismantling work, the contents of the notice on the dismantling and the policy of administration offices to deal with it were reported to the Nuclear Safety Commission beforehand, and after the approval was obtained, it has been executed. Based on the talk of the chairman of Nuclear Safety Commission on January 6, 1983, the state of dismantling is reported. In fiscal year 1986, the second stage dismantling was begun in December, and it was confirmed that the works were carried out safety. In order to ensure the place required for dismantling and removing in-core structures and the pressure vessel, the pressure vessel upper cover and its heat insulator were removed from the third story of the containment vessel. A part of the facilities installed on the second and third stories of the containment vessel was also dismantled and removed. In order to utilize as the place for the temporary preservation and decontamination of dismantled things, a part of the facilities installed in the dump condenser building was dismantled and removed. The control building was reconstructed for smoothly carrying out the entrance control of workers. 36 spent fuel assemblies were carried away for reprocessing. The exposure dose of workers was below the detectable limit of film badges. The dismantled wastes were about 171 t of metals and 34 t of concrete. (Kako, I.)

  20. Decontamination and dismantlement of the JANUS Reactor at Argonne National Laboratory-East. Project final report

    International Nuclear Information System (INIS)

    Fellhauer, C.R.; Clark, F.R.

    1997-10-01

    The decontamination and dismantlement of the JANUS Reactor at Argonne National Laboratory-East (ANL-E) was completed in October 1997. Descriptions and evaluations of the activities performed and analyses of the results obtained during the JANUS D and D Project are provided in this Final Report. The following information is included: objective of the JANUS D and D Project; history of the JANUS Reactor facility; description of the ANL-E site and the JANUS Reactor facility; overview of the D and D activities performed; description of the project planning and engineering; description of the D and D operations; summary of the final status of the JANUS Reactor facility based upon the final survey results; description of the health and safety aspects of the project, including personnel exposure and OSHA reporting; summary of the waste minimization techniques utilized and total waste generated by the project; and summary of the final cost and schedule for the JANUS D and D Project

  1. 300 Area waste acid treatment system closure plan

    International Nuclear Information System (INIS)

    LUKE, S.N.

    1999-01-01

    The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOERL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion includes closure plan documentation submitted for individual, treatment, storage, and/or disposal units undergoing closure, such as the 300 Area Waste Acid Treatment System. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in the General Information Portion). Whenever appropriate, 300 Area Waste Acid Treatment System documentation makes cross-reference to the General Information Portion, rather than duplicating text. This 300 Area Waste Acid Treatment System Closure Plan (Revision 2) includes a Hanford Facility Dangerous Waste Permit Application, Part A, Form 3. Information provided in this closure plan is current as of April 1999

  2. 300 Area waste acid treatment system closure plan

    Energy Technology Data Exchange (ETDEWEB)

    LUKE, S.N.

    1999-05-17

    The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOERL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion includes closure plan documentation submitted for individual, treatment, storage, and/or disposal units undergoing closure, such as the 300 Area Waste Acid Treatment System. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in the General Information Portion). Whenever appropriate, 300 Area Waste Acid Treatment System documentation makes cross-reference to the General Information Portion, rather than duplicating text. This 300 Area Waste Acid Treatment System Closure Plan (Revision 2) includes a Hanford Facility Dangerous Waste Permit Application, Part A, Form 3. Information provided in this closure plan is current as of April 1999.

  3. Evaluation formulas of manpower needs for dismantling of equipment in FUGEN-3. Dismantling process of the condenser removal

    International Nuclear Information System (INIS)

    Kubota, Shintaro; Izumo, Sari; Usui, Hideo; Kawagoshi, Hiroshi; Koda, Yuya; Nanko, Takashi

    2014-07-01

    Japan Atomic Energy Agency (JAEA) has been developing the PRODIA code which supports to make decommissioning plan and has been preparing evaluation formulas. Manpower needs for the dismantling of the condenser that had conducted from 2010 to 2012 was analyzed and compared with existing evaluation formulas. Applicability of evaluation formulas for a large scale reactor facility was confirmed in dismantling of the heat insulating materials and reliability of unit productivity factor was improved. The evaluation formula of work for clearance was made in dismantling of pipes and supports. Unit productivity factor of dismantling of feed water heaters which is applicable for a large scale reactor facility was derived. For derivation of unit productivity factor, statistically meaningful data was provided from the dismantling of the condenser. Manpower needs for dismantling of the condenser has positive correlation to the weight of equipment and can be described in linear expression. Reliability of each unit productivity factor will be improved with accumulating actual dismantling data in future. (author)

  4. DECISION ANALYSIS SCIENCE MODELING FOR APPLICATION AND FIELDING SELECTION APPLIED TO EQUIPMENT DISMANTLEMENT TECHNOLOGIES

    International Nuclear Information System (INIS)

    Ebadian, M.A.

    1999-01-01

    The dismantlement of radioactively contaminated process equipment is a major concern during the D and D process. There are an estimated 1,200 buildings in the DOE-EM complex that will require the dismantlement of equipment and various metal structures. As buildings undergo the D and D process, this metallic equipment contaminated with radionuclides such as uranium and plutonium must be size-reduced before final disposal. A single information source comparing dismantlement technologies in the areas of safety, cost, and performance is needed by DOE managers and is not currently available. The selection of the appropriate technologies to meet the dismantlement objectives for a given site is a difficult process in the absence of comprehensive and comparable data. Choosing the wrong technology could result in increased exposure of personnel to contaminants and an increase in D and D project costs. The purpose of this investigation was to evaluate commercially available and innovative technologies for equipment dismantlement and provide a comprehensive source of information to the D and D community in the areas of technology performance, cost, and health and safety

  5. Remediation and decommissioning of radioactive waste facilities in Estonia

    International Nuclear Information System (INIS)

    Putnik, H.; Realo, E.

    2001-01-01

    Full text: The nuclear training facility at Paldiski was constructed in the early 1960's by the former USSR Navy. The hull sections of Delta and Echo class submarines each housing a full-sized ship reactor were installed in the main building of the site for training of navy personnel in safe operation of the submarine nuclear reactor systems. The first reactor was commissioned in 1968 and the second in 1982, while both was shut down in 1989. After Estonia's reproclamation of independence in 1991 the responsibility for the clean up and decommissioning of the Paldiski site became a subject of negotiations between Russia and Estonia. As the result Estonia took the ownership and control of the site in September 1995. Before the take over the Russian authorities defuelled the reactors and transported the spent fuel to Russia, dismantled the hull sections not related with reactor systems, seal-welded the hull sections housing the reactor vessels with their primary circuitry and enclosed those in reinforced concrete sarcophagi. The auxiliary facilities and radioactive waste were left intact. Main goals of the Conceptual Decommissioning Plan for the Paldiski facilities, developed under the auspices of the Paldiski International Expert Reference Group (Pier, a group established at the request of the Estonian government to advise local authorities to maintain the decommissioning and waste management at Paldiski) were defined as following: Establishing the waste management system and a long term monitored interim storage, corresponding to internationally accepted safety standards and capable to condition, receive and store all the waste generated during decommissioning of the facility; Reductions of the extent of radiologically controlled areas as much as possible, in order to minimise maintenance requirements. To achieve these goals the following main tasks were addressed in the short and medium term site management action plans: Rearrangement of site for the needs of

  6. The assessment of source attribution of soil pollution in a typical e-waste recycling town and its surrounding regions using the combined organic and inorganic dataset.

    Science.gov (United States)

    Luo, Jie; Qi, Shihua; Xie, Xianming; Gu, X W Sophie; Wang, Jinji

    2017-01-01

    Guiyu is a well-known electronic waste dismantling and recycling town in south China. Concentrations and distribution of the 21 mineral elements and 16 polycyclic aromatic hydrocarbons (PAHs) collected there were evaluated. Principal component analyses (PCA) applied to the data matrix of PAHs in the soil extracted three major factors explaining 85.7% of the total variability identified as traffic emission, coal combustion, and an unidentified source. By using metallic or metalloid element concentrations as variables, five principal components (PCs) were identified and accounted for 70.4% of the information included in the initial data matrix, which can be denoted as e-waste dismantling-related contamination, two different geological origins, anthropogenic influenced source, and marine aerosols. Combining the 21 metallic and metalloid element datasets with the 16 PAH concentrations can narrow down the coarse source and decrease the unidentified contribution to soil in the present study and therefore effectively assists the source identification process.

  7. Polybrominated diphenyl ethers in road and farmland soils from an e-waste recycling region in Southern China: Concentrations, source profiles, and potential dispersion and deposition

    International Nuclear Information System (INIS)

    Luo Yong; Luo Xiaojun; Lin Zhen; Chen Shejun; Liu Juan; Mai Bixian; Yang Zhongyi

    2009-01-01

    The present study analyzed road soils collected near the dismantling workshops of an e-waste recycling region in South China to determine the PBDE profiles. Farmland soils at a distance of about 2 km from the dismantling workshops were also collected to evaluate the potential dispersion and deposition of PBDEs in the surrounding environment. Total PBDE concentrations ranged from 191 to 9156 ng/g dry weight in road soils and from 2.9 to 207 ng/g dry weight in farmland soils, respectively. Three PBDE source profiles were observed from the road soils by principal component analysis, and were compared with the congener patterns in different technical products. Elevated abundances of octa- and nona-congeners were found in the 'deca-' derived PBDEs as compared with the deca-BDE products. The results in this study suggest that debromination of BDE 209 may have occurred during the use of electric and electronic equipment and/or another technical formulation (Bromkal 79-8DE) was also likely the source of octa- and nona-congeners in e-wastes. Comparison of the PBDE patterns in road and farmland soils implied that the PBDEs in farmland soils have been subject to complex environmental processes

  8. Direction in charge of the management of wastes. 1998 activity report

    International Nuclear Information System (INIS)

    1998-01-01

    This document is the 1998 activity report of the direction in charge of the management of radioactive wastes (DGD) of the French atomic energy commission (CEA). The role of the DGD is the elimination of radioactive wastes, the management of spent fuels, the cleansing and dismantling of shut-down and decommissioned installations at the CEA. This report summarizes the highlights of the 1998 year: the cleansing plan of the CEA (current policy, plan scheme, quality assurance, financing, public relation); the radioactive wastes (general considerations, management of liquid and solid effluents, management of sealed sources, modernization of equipments and new projects, relations with the Andra, studies in progress); the spent fuels (general considerations, solutions, long-term storage); the dismantling of shut-down installations (general considerations about decommissioning, dismantling actions at the CEA, main works performed, dismantling actions in progress); the management of wastes at the CEA-direction for military applications (DAM); the cleansing of the CEA-Marcoule site; 1998 status of the management of wastes (appendix). (J.S.)

  9. Decision Analysis Science Modeling for Application and Fielding Selection Applied to Equipment Dismantlement Technologies. Topical Report January 1998

    International Nuclear Information System (INIS)

    Ebadian, M.A.

    1998-01-01

    The dismantlement of radioactively contaminated process equipment is a major concern during the D and D process. As buildings undergo the D and D process, metallic equipment contaminated with radionuclides such as uranium and plutonium must be dismantled before final disposal.The primary objective for equipment dismantlement is to reduce the potential for personnel and environmental exposure to contaminants during the decommissioning of the nuclear facility. The selection of the appropriate technologies to meet the dismantlement objectives for a given site is a difficult process in the absence of comprehensive and comparable data. Choosing the wrong technology could result in increased exposure of personnel to contaminants and an increase in D and D project costs. Innovative technologies are being developed with the goal of providing safer and more cost-effective alternatives that generate less secondary waste, thereby decreasing the operating costs for dismantlement. During the development and implementation process, performance indicators for the success of these technologies must be reviewed to ensure that these aims are being met. This project provides a mechanism for the assessment of innovative and commercially available nuclear and non-nuclear technologies for equipment dismantlement

  10. Process Concepts for Semi-automatic Dismantling of LCD Televisions

    OpenAIRE

    Elo, Kristofer; Sundin, Erik

    2014-01-01

    There is a large variety of electrical and electronic equipment products, for example liquid crystal display television sets (LCD TVs), in the waste stream today. Many LCD TVs contain mercury, which is a challenge to treat at the recycling plants. Two current used processes to recycle LCD TVs are automated shredding and manual disassembly. This paper aims to present concepts for semi-automated dismantling processes for LCD TVs in order to achieve higher productivity and flexibility, and in tu...

  11. Dismantling of the rooms 82 to 100 at Marcoule

    International Nuclear Information System (INIS)

    Fiol, A.

    1988-01-01

    The dismantling of the rooms 82 to 100 at Marcoule is up to now, the most important decommissioning operation. The COGEMA Marcoule had the responsibility of studying and organizing the operation. On the works site the work was performed by STMI. The construction of a complete nuclear waste processing system was necessary, to protect against Pu contamination. Moreover, the efficiency of the work, was improved by the development and use of large special cutting tools [fr

  12. Different profiles of anthropogenic and naturally produced organohalogen compounds in serum from residents living near a coastal area and e-waste recycling workers in India.

    Science.gov (United States)

    Eguchi, Akifumi; Nomiyama, Kei; Devanathan, Gnanasekaran; Subramanian, Annamalai; Bulbule, Kesav A; Parthasarathy, Peethambaram; Takahashi, Shin; Tanabe, Shinsuke

    2012-10-15

    We determined the contamination status and accumulation profiles of polychlorinated biphenyls (PCBs), hydroxylated PCB congeners (OH-PCBs), polybrominated diphenyl ethers (PBDEs), hydroxylated PBDEs (OH-PBDEs), methoxylated PBDEs (MeO-PBDEs), and bromophenols (BPhs) in serum from e-waste recycling workers and residents near a coastal area in India. Residue levels of penta- to octa-chlorinated PCBs, penta- to octa-chlorinated OH-PCBs, 6MeO-BDE47, 6OH-BDE47, and 2,4,6-tri-BPh in serum from residents living near the coastal area were significantly higher than those in serum from e-waste recycling workers. Residue levels of tri- to tetra-chlorinated PCBs, tri- to tetra-chlorinated OH-PCBs, PBDEs, octa-brominated OH-PBDEs, and tetra-BPhs in serum from e-waste recycling workers were higher than those in serum from residents living near the coastal area. Principal component analysis revealed that residents living near the coastal area and e-waste recycling workers had different serum profiles of chlorinated and brominated compounds. Copyright © 2012 Elsevier Ltd. All rights reserved.

  13. Adaptation of high pressure water jets with abrasives for nuclear installations dismantling

    International Nuclear Information System (INIS)

    Rouviere, R.; Pinault, M.; Gasc, B.; Guiadeur, R.; Pilot, M.

    1989-01-01

    This report presents the work realized for adjust the cutting technology with high pressure water jet with abrasives for nuclear installation dismantling. It has necessited the conception and the adjustement of a remote tool and the realization of cutting tests with waste produce analysis. This technic can be ameliorated with better viewing systems and better fog suction systems

  14. Reduction of heavy metals in residues from the dismantling of waste electrical and electronic equipment before incineration

    International Nuclear Information System (INIS)

    Long, Yu-Yang; Feng, Yi-Jian; Cai, Si-Shi; Hu, Li-Fang; Shen, Dong-Sheng

    2014-01-01

    Highlights: • The highest metal reduction occurs at a 2.36 mm sieving size. • Washing promotes heavy metal recycling without secondary pollution. • Sieving and washing are environmentally friendly pretreatments for WEEE wastes. - Abstract: Residues disposal from the dismantling of waste electrical and electronic equipment are challenging because of the large waste volumes, degradation-resistance, low density and high heavy metal content. Incineration is advantageous for treating these residues but high heavy metal contents may exist in incinerator input and output streams. We have developed and studied a specialized heavy metal reduction process, which includes sieving and washing for treating residues before incineration. The preferable screen aperture for sieving was found to be 2.36 mm (8 meshes) in this study; using this screen aperture resulted in the removal of approximately 47.2% Cu, 65.9% Zn, 26.5% Pb, 55.4% Ni and 58.8% Cd from the residues. Subsequent washing further reduces the heavy metal content in the residues larger than 2.36 mm, with preferable conditions being 400 rpm rotation speed, 5 min washing duration and liquid-to-solid ratio of 25:1. The highest cumulative removal efficiencies of Cu, Zn, Pb, Ni and Cd after sieving and washing reached 81.1%, 61.4%, 75.8%, 97.2% and 72.7%, respectively. The combined sieving and washing process is environmentally friendly, can be used for the removal of heavy metals from the residues and has benefits in terms of heavy metal recycling

  15. Reduction of heavy metals in residues from the dismantling of waste electrical and electronic equipment before incineration

    Energy Technology Data Exchange (ETDEWEB)

    Long, Yu-Yang; Feng, Yi-Jian; Cai, Si-Shi [Zhejiang Provincial Key Laboratory of Solid Waste Treatment and Recycling, School of Environmental Science and Engineering, Zhejiang Gongshang University, Hangzhou 310012 (China); Hu, Li-Fang [College of Quality and Safety Engineering, China Jiliang University, Hangzhou 310018 (China); Shen, Dong-Sheng, E-mail: shends@zju.edu.cn [Zhejiang Provincial Key Laboratory of Solid Waste Treatment and Recycling, School of Environmental Science and Engineering, Zhejiang Gongshang University, Hangzhou 310012 (China)

    2014-05-01

    Highlights: • The highest metal reduction occurs at a 2.36 mm sieving size. • Washing promotes heavy metal recycling without secondary pollution. • Sieving and washing are environmentally friendly pretreatments for WEEE wastes. - Abstract: Residues disposal from the dismantling of waste electrical and electronic equipment are challenging because of the large waste volumes, degradation-resistance, low density and high heavy metal content. Incineration is advantageous for treating these residues but high heavy metal contents may exist in incinerator input and output streams. We have developed and studied a specialized heavy metal reduction process, which includes sieving and washing for treating residues before incineration. The preferable screen aperture for sieving was found to be 2.36 mm (8 meshes) in this study; using this screen aperture resulted in the removal of approximately 47.2% Cu, 65.9% Zn, 26.5% Pb, 55.4% Ni and 58.8% Cd from the residues. Subsequent washing further reduces the heavy metal content in the residues larger than 2.36 mm, with preferable conditions being 400 rpm rotation speed, 5 min washing duration and liquid-to-solid ratio of 25:1. The highest cumulative removal efficiencies of Cu, Zn, Pb, Ni and Cd after sieving and washing reached 81.1%, 61.4%, 75.8%, 97.2% and 72.7%, respectively. The combined sieving and washing process is environmentally friendly, can be used for the removal of heavy metals from the residues and has benefits in terms of heavy metal recycling.

  16. Strategies for the disposition of high explosives resulting from dismantlement of nuclear weapons

    International Nuclear Information System (INIS)

    Pruneda, C.; Humphrey, J.

    1993-03-01

    Many thousands of pounds of high quality main-charge explosives will result as surplus from the dismantlement of returns from the US nuclear weapons stockpile. The method most often employed for dealing with this surplus explosive is destruction by open burning. However, open burning as a means of treating excess explosives is losing favor because of environmental concerns associated with such an uncontrolled thermal destruction process. Thus, alternative processes for treatment of excess explosives from weapon dismantlement is discussed. These alternatives include: reformulation, crystalline component recovery, chemical conversion of the crystalline component to higher value products which may have civilian or military applications and, when necessary, treatment as waste in an environmentally benign fashion

  17. Experience in the decontamination and dismantling of alpha facilities

    International Nuclear Information System (INIS)

    Charamathieu, A.

    1988-01-01

    Experience in dismantling alpha-containing radiochemical installations in France is described. The dismantling programme undertaken by the Societe des Techniques en Milieu Ionisant since 1977 is tabulated. This includes the dismantling of CALCIO and FLUO (plutonium metal), the dismantling of a slag processing plant, the dismantling of part of a medium activity plutonium mine and the dismantling of rooms 82-100 at Marcoule, France. (author)

  18. Technical challenges for dismantlement verification

    International Nuclear Information System (INIS)

    Olinger, C.T.; Stanbro, W.D.; Johnston, R.G.; Nakhleh, C.W.; Dreicer, J.S.

    1997-01-01

    In preparation for future nuclear arms reduction treaties, including any potential successor treaties to START I and II, the authors have been examining possible methods for bilateral warhead dismantlement verification. Warhead dismantlement verification raises significant challenges in the political, legal, and technical arenas. This discussion will focus on the technical issues raised by warhead arms controls. Technical complications arise from several sources. These will be discussed under the headings of warhead authentication, chain-of-custody, dismantlement verification, non-nuclear component tracking, component monitoring, and irreversibility. The authors will discuss possible technical options to address these challenges as applied to a generic dismantlement and disposition process, in the process identifying limitations and vulnerabilities. They expect that these considerations will play a large role in any future arms reduction effort and, therefore, should be addressed in a timely fashion

  19. Guidelines for Waste Accumulation Areas (WAAs)

    International Nuclear Information System (INIS)

    1991-07-01

    The purpose of this document is to set conditions for establishing and maintaining areas for the accumulation of hazardous waste at LBL. Areas designed for accumulation of these wastes in quantities greater than 100 kg (220 lb) per month of solid waste or 55 gallons per month of liquid waste are called Waste Accumulation Areas (WAAs). Areas designed for accumulation of wastes in smaller amounts are called Satellite Accumulation Areas (SAAs). This document provides guidelines for employee and organizational responsibilities for WAAs; constructing a WAA; storing waste in a WAA; operating and maintaining a WAA, and responding to spills in a WAA. 4 figs

  20. Stade. Decommissioning and dismantling of the nuclear power plant - from the nuclear power plant to the green lawn. 3. ed.

    International Nuclear Information System (INIS)

    2008-01-01

    The nuclear power plant Stade (KKS) was shutdown in 2003 and is being dismantled since 2005. The contribution covers the following issues: What means decommissioning and dismantling? What was the reason for decommissioning? What experiences on the dismantling of nuclear power plants are available? What is the dismantling procedure? What challenges for the power plant personal result from dismantling? What happens with the deconstruction material? What happens with the resulting free area (the ''green lawn'')? What is the legal frame work for dismantling?

  1. Special Analysis: Updated Analysis of the Effect of Wood Products on Trench Disposal Limits at the E-Area Low-Level Waste Facility

    International Nuclear Information System (INIS)

    Cook, J.R.

    2001-01-01

    This Special Analysis (SA) develops revised radionuclide inventory limits for trench disposal of low-level radioactive waste in the presence of wood products in the E-Area Low-Level Waste Facility. These limits should be used to modify the Waste Acceptance Criteria (WAC) for trench disposal. Because the work on which this SA is based employed data from tests using 100 percent wood products, the 40 percent limitation on wood products for trench (i.e., slit or engineered trench) disposal is not needed in the modified WAC

  2. UDIN's dismantling projects

    International Nuclear Information System (INIS)

    Laffaille, C.

    1993-01-01

    The role of UDIN (Central unit for nuclear facility decommissioning) at the CEA is reviewed together with the main specific aspects of nuclear dismantling: the different options and dismantling strategies and costs. The characteristics of the main on-going projects are described: graphite-gas reactors (G2/G3), RAPSODIE (RNR), AT1 (pilot RNR fuel reprocessing plant), ELAN II B (Cesium source conditioning plant), EL4 (heavy water/CO2 reactor), RM2 (fuel control radio-metallurgical laboratory) and UB-UM (Uranium enrichment plant)

  3. E-Area Low-Level Waste Facility Vadose Zone Model: Confirmation of Water Mass Balance for Subsidence Scenarios

    Energy Technology Data Exchange (ETDEWEB)

    Dyer, J. A. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2017-11-30

    In preparation for the next revision of the E-Area Low-Level Waste Facility (LLWF) Performance Assessment (PA), a mass balance model was developed in Microsoft Excel to confirm correct implementation of intact- and subsided-area infiltration profiles for the proposed closure cap in the PORFLOW vadose-zone model. The infiltration profiles are based on the results of Hydrologic Evaluation of Landfill Performance (HELP) model simulations for both intact and subsided cases.

  4. The challenge of electronic waste (e-waste) management in developing countries.

    Science.gov (United States)

    Osibanjo, O; Nnorom, I C

    2007-12-01

    Information and telecommunications technology (ICT) and computer Internet networking has penetrated nearly every aspect of modern life, and is positively affecting human life even in the most remote areas of the developing countries. The rapid growth in ICT has led to an improvement in the capacity of computers but simultaneously to a decrease in the products lifetime as a result of which increasingly large quantities of waste electrical and electronic equipment (e-waste) are generated annually. ICT development in most developing countries, particularly in Africa, depends more on secondhand or refurbished EEEs most of which are imported without confirmatory testing for functionality. As a result large quantities of e-waste are presently being managed in these countries. The challenges facing the developing countries in e-waste management include: an absence of infrastructure for appropriate waste management, an absence of legislation dealing specifically with e-waste, an absence of any framework for end-of-life (EoL) product take-back or implementation of extended producer responsibility (EPR). This study examines these issues as they relate to practices in developing countries with emphasis on the prevailing situation in Nigeria. Effective management of e-waste in the developing countries demands the implementation of EPR, the establishment of product reuse through remanufacturing and the introduction of efficient recycling facilities. The implementation of a global system for the standardization and certification/labelling of secondhand appliances intended for export to developing countries will be required to control the export of electronic recyclables (e-scarp) in the name of secondhand appliances.

  5. Project WAGR: the UK demonstration project for power reactor decommissioning - a review of the tools used to dismantle the reactor core

    International Nuclear Information System (INIS)

    Benest, T.G.

    2008-01-01

    The United Kingdom Atomic Energy Authority (UKAEA) has built and operated a wide range of nuclear facilities since the late 1940. UKAEA mission is to restore the environment of its sites in a safe and secure manner. This restoration includes the decommissioning of a number of redundant research and power reactors. The Windscale Advanced Gas-cooled Reactor (WAGR) was the UK prototype Advanced gas cooled reactor and became the forerunner of a family of 14 reactors built to generate cheaper and more efficient electricity in the UK. WAGR was constructed between 1957 and 1961 and was a carbon dioxide cooled, graphite moderated reactor using uranium oxide fuel in stainless steel cans. The reactor consisted of a graphite moderator housed in a cylindrical reactor vessel with hemispherical ends. The reactor and associated heat exchangers were enclosed in the iconic spherical containment building regularly used by the media in the UK as an illustration of the nuclear industry. The reactor first produced power in August 1962 and achieved full design output in 1963. It operated at an electrical output of 33 MW (E) for 18 years (average load factor of 75%). In 1981 the reactor was shut down after satisfactory completion of all the research and development objectives. In anticipation of the UK likely nuclear decommissioning needs the UKAEA decided to decommission WAGR to the International Atomic Energy Agency (IAEA) stage 3 (restoration of the area occupied by the facility to a condition of unrestricted re-usability) as the national demonstration exercise for power reactor decommissioning. Since 1998 the UKAEA and its contractors have been undertaking the dismantling of the reactor core components and pressure vessel in a series of 10 campaigns. These contain neutron activated components expected to produce dose rates well in excess of 1 Sv/hr. To carry out the work UKAEA installed an 8M remote dismantling machine (RDM) a waste recovery and transport system and a shielded waste

  6. Secondary waste characteristics and ITS filtration system on laser cutting

    Energy Technology Data Exchange (ETDEWEB)

    Hara, Kunio; Miyao, Hidehiko [Research Association for Facility Decommissioning (RANDEC), Tokai, Ibaraki (Japan); Nakazawa, Masaharu [Tokyo Univ. (Japan); Kataoka, Shinichi; Nagura, Yasumi; Saiki, Hideo [Mitsubishi Heavy Industries Ltd., Tokyo (Japan)

    2001-03-01

    Technology of dismantling nuclear facilities has been developing in various fields for its evaluation and dismantling system. RANDEC has been studying remote dismantling system for highly activated equipments such as core internals with a laser using optical fiber. Recently a high power YAG laser having the advantage of application for remote dismantling on thick metallic material is the stage for practical use, and narrow kerf can bring the reduction of secondary waste as well. The present paper describes the experimental results and discussion on the laser cutting, including the secondary waste characteristics and its filtration system using the YAG laser. This study has been performed on consignment to RANDEC from the Science and Technology Agency of Japan. (author)

  7. E-Waste and the Sustainable Organisation: Griffith University's Approach to E-Waste

    Science.gov (United States)

    Davis, Georgina; Wolski, Malcolm

    2009-01-01

    Purpose: This paper seeks to provide details of Griffith University's (GU) approach for sustainably dealing with electronic waste (e-waste) and the benefits of using the e-waste programme as a valuable educational case study for ESD. Design/methodology/approach: The e-waste programme is explained with reference to key resources and literature, so…

  8. R and D program of the Spanish National Company for Radioactive Wastes management

    International Nuclear Information System (INIS)

    Astudillo, J.

    1993-01-01

    The second R+D program of the Spanish National Company for Radioactive Wastes Management (ENRESA) has a whole budget of 56 million $ for the period 1991-1995. This program is included within the Spanish Energy Plan (PEN-91) and encompasses four main areas: 1) Low and medium level radioactive wastes 2) High level radioactive wastes 3) Decommissioning and dismantling of nuclear installations 4) Radiological protection The Spanish program is coordinated with policies of international organizations: CEC,OECD and IAEA

  9. Bioaccessibility and health risk of heavy metals in ash from the incineration of different e-waste residues.

    Science.gov (United States)

    Tao, Xiao-Qing; Shen, Dong-Sheng; Shentu, Jia-Li; Long, Yu-Yang; Feng, Yi-Jian; Shen, Chen-Chao

    2015-03-01

    Ash from incinerated e-waste dismantling residues (EDR) may cause significant health risks to people through ingestion, inhalation, and dermal contact exposure pathways. Ashes of four classified e-waste types generated by an incineration plant in Zhejiang, China were collected. Total contents and the bioaccessibilities of Cd, Cu, Ni, Pb, and Zn in ashes were measured to provide crucial information to evaluate the health risks for incinerator workers and children living in vicinity. Compared to raw e-waste in mixture, ash was metal-enriched by category incinerated. However, the physiologically based extraction test (PBET) indicates the bioaccessibilities of Ni, Pb, and Zn were less than 50 %. Obviously, bioaccessibilities need to be considered in noncancer risk estimate. Total and PBET-extractable contents of metal, except for Pb, were significantly correlated with the pH of the ash. Noncancer risks of ash from different incinerator parts decreased in the order bag filter ash (BFA) > cyclone separator ash (CFA) > bottom ash (BA). The hazard quotient for exposure to ash were decreased as ingestion > dermal contact > inhalation. Pb in ingested ash dominated (>80 %) noncancer risks, and children had high chronic risks from Pb (hazard index >10). Carcinogenic risks from exposure to ash were under the acceptable level (incinerated ash are made.

  10. West Valley Demonstration Project, Waste Management Area #3 -- Closure Alternative I

    Energy Technology Data Exchange (ETDEWEB)

    Marschke, Stephen F. [Environmental Measurements Laboratory (EML), New York, NY (United States)

    2000-06-30

    The Draft Environmental Impact Statement for the completion of the West Valley Demonstration Project and closure and/or long-term management of facilities at the Western New York Nuclear Service Center divided the site into Waste Management Areas (WMAs), and for each WMA, presented the impacts associated with five potential closure alternatives. This report focuses on WMA 3 (the High-Level Waste (HLW) Storage Area (Tanks 8D-1 and 8D-2), the Vitrification Facility and other facilities) and closure Alternative I (the complete removal of all structures, systems and components and the release of the area for unrestricted use), and reestimates the impacts associated with the complete removal of the HLW tanks, and surrounding facilities. A 32-step approach was developed for the complete removal of Tanks 8D-1 and 8D-2, the Supernatant Treatment System Support Building, and the Transfer Trench. First, a shielded Confinement Structure would be constructed to reduce the shine dose rate and to control radioactivity releases. Similarly, the tank heels would be stabilized to reduce potential radiation exposures. Next, the tank removal methodology would include: 1) excavation of the vault cover soil, 2) removal of the vault roof, 3) cutting off the tank’s top, 4) removal of the stabilized heel remaining inside the tank, 5) cutting up the tank’s walls and floor, 6) removal of the vault’s walls, the perlite blocks, and vault floor, and 7) radiation surveying and backfilling the resulting hole. After the tanks are removed, the Confinement Structure would be decontaminated and dismantled, and the site backfilled and landscaped. The impacts (including waste disposal quantities, emissions, work-effort, radiation exposures, injuries and fatalities, consumable materials used, and costs) were estimated based on this 32 step removal methodology, and added to the previously estimated impacts for closure of the other facilities within WMA 3 to obtain the total impacts from

  11. II meeting of R and D in radioactive waste management

    International Nuclear Information System (INIS)

    Astudillo Pastor, J.

    1995-01-01

    The report includes the principal features on the content and development of the Second Seminar on R+D in the Management of Radioactive Waste organised by ENRESA, the National Company responsible for waste management in Spain. More than 200 scientists working in the Second R+D Program have participated. The topical areas included low-intermediate level and high-level wastes as well as Radiation Protection and Decommissioning and Dismantling issues. During the Seminar two round tables and the official presentation of the Third R+D Program have been included. (Author)

  12. Technical report on natural evaporation system for radioactive liquid waste treatment arising from TRIGA research reactors' decontamination and decommissioning activities

    International Nuclear Information System (INIS)

    Moon, J. S.; Jung, K. J.; Baek, S. T.; Jung, U. S.; Park, S. K.; Jung, K. H.

    1999-01-01

    This technical report described that radioactive liquid waste treatment for dismantling/decontamination of TRIGA Mark research reactor in Seoul. That is, we try safety treatment of operation radioactive liquid waste during of operating TRIGA Mark research reactor and dismantling radioactive liquid waste during R and D of research reactor hereafter, and by utilizing of new natural evaporation facility with describing design criteria of new natural evaporation facility. Therefore, this technical report described the quantity of present radioactive liquid waste and dismantling radioactive liquid waste hereafter, analysis the status of radial-rays/radioactivity, and also treatment method of this radioactive liquid waste. Also, we derived the method that the safeguard of outskirts environment and the cost down of radioactive liquid waste treatment by minimize of the radioactive liquid waste quantities, through-out design/operation of new natural evaporation facility for treatment of operation radioactive liquid waste and dismantling radioactive liquid waste. (author). 6 refs., 12 tabs., 5 figs

  13. Dismantling of civilian nuclear powered fleet technical support vessels. engineering solutions - 59386

    International Nuclear Information System (INIS)

    Kulikov, Konstantin N.; Nizamutdinov, Rinat A.; Abramov, Andrey N.

    2012-01-01

    At the present time six nuclear technical support vessels are operated and maintained by Atomflot. Two of them (Volodarsky FTB (floating technical base) and Lepse FTB) were taken out of service for decommissioning and are stored afloat. One more vessel Lotta FTB should be decommissioned during next two years. The nuclear technological support ships carrying spent nuclear fuel (SNF), liquid and solid radioactive wastes (LRW and SRW) appear to be a possible radiation contamination of Murmansk region and Kola Bay because the Ship long-term storage afloat has the negative effect on hull's structures technical condition. As a result of this in the context of the Federal Program 'Nuclear and Radiation Safety' (2008-2015) NIPTB Onega OAO was engaged by state corporation Rosatom to develop the dismantling procedure for Volodarsky FTB and Lotta FTB. Before developing of nuclear technological support ships decommissioning projects the technical and economic assessment of decommissioning/dismantling was carried out. The following options were examined: - formation of module as one-piece Ship's hull for long-term storage at Saida Bay; - formation of separated modules for long-term storage at Saida Bay; - complete dismantling of hull's structures, systems and equipment with packing all generated SRW into certified long-term storage containers. This paper contains description of options, research procedure, comparative analysis of options of decommissioning and dismantling (D and D) of nuclear technological support ships and its difference with dismantling of nuclear submarine. On the basis of the technical and economic assessment of FTB D and D options the least expensive on the first D and D stage and the least duration option is the option 1 (Formation of module as one-piece Ship's hull for long-term storage at Saida Bay). By the implementation of the given option there will be the need of large areas for modules storage at Saida Bay. It was not considered while working out

  14. The very low level radioactive military waste in France

    International Nuclear Information System (INIS)

    2005-01-01

    The recommendations of the Observatory of French nuclear weapons call attention to the fact the I.N.B.S. depend on the services of the High Commissioner of Atomic Energy;call attention to the fact that the reactors of the nuclear propulsion ( only military ones) are out of regulation: independent studies have to be realised on three harbors (Brest, Toulon, Cherbourg) for an evaluation about the environmental and sanitary consequences of the presence of nuclear facilities near urban areas that is not the case for any civil nuclear installation; call attention on the dismantling operations actually in some military nuclear installations, who is in charge of the control of the different steps of these dismantling operations, call attention on the setting up of radioactive waste storage ( very low activity at Saint-Priest, Rhone, very high activity with americium at Valduc, long lived elements at Cadarache, tritium waste at Valduc, alpha waste at Valduc waste not under the control of an independent organism; call attention on the final destination of depleted uranium; call attention on the bad management of tritium by the installation of nuclear weapons fabrication, about the actual stocks in plutonium and uranium. (N.C.)

  15. Evolution of radiation protection of overall decommissioning and Dismantling of a Nuclear Power Plants

    International Nuclear Information System (INIS)

    Ortiz, M. T.; Ondaro, M.; Irun, I.; Just, J.

    2000-01-01

    From the point of view of Radiological Protection, the overall Decommissioning and Dismantling (D and D) Plan of a Nuclear Power Plant cannot be considered in isolation without considering the evolution of the radiological characteristics of the installation and the site itself from previous, during and final states. This experience of D and D is the first in Spain and in other European countries due to several aspects: 1) the reference reactor technology, 2) total grass power, and 3) management of a great amount of materials to be released. Three decommissioning alternatives were studied: Indefinite maintenance in shutdown state, Stage 1. Stage 2 for the defuelled reactor vessel and contents, with decontamination of most of the rest of the site. Immediate dismantling to Stage 3. Stage 2 was the alternative selected with the release of 80% of the site, keeping the remaining 20% of the site as a regulated area, housing the reactor vessel in a new structure and removing the radioactive waste. The above, along with the fact that this is a specific type of natural uranium-graphite-gas plant (NUGG) and that ownership of the facility has been transferred for dismantling (from HIFRENSA to ENRESA), implies a series of preliminary considerations that, for the purposes of this article, are compiled in the following aspects: a) Preliminary phase prior to transfer, b) Preparatory phase, and c) Dismantling phase. This paper describes aspects under the D and D experiences at CN-V1 NPP, now in progress, from the point of view of the radiological aspects in relation with the continuous updating of the source term. Operative Radiological nuclide vectors, applicable in the Radiation Protection tasks, are also commented to prevent and evaluate several risks during the execution of the works. Finally, there is a description of the results obtained from the work performed to decay the three actual nuclide vectors, to evaluate and obtain activity calculations for the release of the

  16. Decommissioning and Dismantling of the Floating Maintenance Base 'Lepse' - 13316

    International Nuclear Information System (INIS)

    Field, D.; Mizen, K.

    2013-01-01

    The Lepse was built in Russia in 1934 and commissioned as a dry cargo ship. In 1961 she was re-equipped for use as a nuclear service ship (NSS), specifically a floating maintenance base (FMB), to support the operation of the civilian nuclear fleet (ice-breakers) of the USSR. In 1988 Lepse was taken out of service and in 1990 she was re-classified as a 'berth connected ship', located at a berth near the port of Murmansk under the ownership of Federal State Unitary Enterprise (FSUE) Atomflot. Lepse has special storage facilities for spent nuclear fuel assemblies (SFA) that have been used to store several hundred SFAs for nearly 40 years. High and intermediate-level liquid radioactive waste (LRW) is also present in the spent nuclear fuel assembly storage channels, in special tanks and also in the SFA cooling circuit. Many of the SFAs stored in Lepse are classified as damaged and cannot be removed using standard procedures. The removal of the SFA and LRW from the Lepse storage facilities is a hazardous task and requires specially designed tools, equipment and an infrastructure in which these can be deployed safely. Lepse is a significant environmental hazard in the North West of Russia. Storing spent nuclear fuel and high-level liquid radioactive waste on board Lepse in the current conditions is not acceptable with respect to Russian Federation health, safety and environmental standards and with international best practice. The approved concept design for the removal of the SFA and LRW and dismantling of Lepse requires that the ship be transported to Nerpa shipyard where specialist infrastructure will be constructed and equipment installed. One of the main complexities of the Project lies within the number of interested stakeholders involved in the Project. The Lepse project has been high focus on the international stage for many years with previous international efforts failing to make significant progress towards the objective of decommissioning Lepse. The Northern

  17. Iraq nuclear facility dismantlement and disposal project

    Energy Technology Data Exchange (ETDEWEB)

    Cochran, J R; Danneels, J [Sandia National Laboratories, Albuquerque, NM (United States); Kenagy, W D [U.S. Department of State, Bureau of International Security and Nonproliferation, Office of Nuclear Energy, Safety and Security, Washington, DC (United States); Phillips, C J; Chesser, R K [Center for Environmental Radiation Studies, Texas Tech University, Lubbock, TX (United States)

    2007-07-01

    The Al Tuwaitha nuclear complex near Baghdad contains a significant number of nuclear facilities from Saddam Hussein's dictatorship. Because of past military operations, lack of upkeep and looting there is now an enormous radioactive waste problem at Al Tuwaitha. Al Tuwaitha contains uncharacterised radioactive wastes, yellow cake, sealed radioactive sources, and contaminated metals. The current security situation in Iraq hampers all aspects of radioactive waste management. Further, Iraq has never had a radioactive waste disposal facility, which means that ever increasing quantities of radioactive waste and material must be held in guarded storage. The Iraq Nuclear Facility Dismantlement and Disposal Program (the NDs Program) has been initiated by the U.S. Department of State (DOS) to assist the Government of Iraq (GOI) in eliminating the threats from poorly controlled radioactive materials, while building human capacities so that the GOI can manage other environmental cleanups in their country. The DOS has funded the International Atomic Energy Agency (IAEA) to provide technical assistance to the GOI via a Technical Cooperation Project. Program coordination will be provided by the DOS, consistent with U.S. and GOI policies, and Sandia National Laboratories will be responsible for coordination of participants and for providing waste management support. Texas Tech University will continue to provide in-country assistance, including radioactive waste characterization and the stand-up of the Iraq Nuclear Services Company. The GOI owns the problems in Iraq and will be responsible for the vast majority of the implementation of the NDs Program. (authors)

  18. Extended storage of low-level radioactive waste: potential problem areas

    International Nuclear Information System (INIS)

    Siskind, B.; Dougherty, D.R.; MacKenzie, D.R.

    1985-12-01

    If a state or state compact does not have adequate disposal capacity for low-level radioactive waste (LLRW) by 1986 as required by the Low-Level Waste Policy Act, then extended storage of certain LLRW may be necessary. In this report, extended storage of LLRW is considered in order to determine for the Nuclear Regulatory Commission areas of concern and actions recommended to resolve these concerns. The focus is on the properties and performance of the waste form and waste container. Storage alternatives are considered in order to characterize the likely storage environments for these wastes. The areas of concern about extended storage of LLRW are grouped into two categories: (1) Performance of the waste form and/or container during storage, e.g., radiolytic gas generation, radiation-enhanced degradation of polymeric materials, and corrosion. (2) Effects of extended storage on the properties of the waste form and/or container that are important after storage (e.g., radiation-induced embrittlement of high-density polyethylene and the weakening of steel containers resulting from corrosion). A discussion is given of additional information and actions required to address these concerns

  19. Reduction of heavy metals in residues from the dismantling of waste electrical and electronic equipment before incineration.

    Science.gov (United States)

    Long, Yu-Yang; Feng, Yi-Jian; Cai, Si-Shi; Hu, Li-Fang; Shen, Dong-Sheng

    2014-05-15

    Residues disposal from the dismantling of waste electrical and electronic equipment are challenging because of the large waste volumes, degradation-resistance, low density and high heavy metal content. Incineration is advantageous for treating these residues but high heavy metal contents may exist in incinerator input and output streams. We have developed and studied a specialized heavy metal reduction process, which includes sieving and washing for treating residues before incineration. The preferable screen aperture for sieving was found to be 2.36mm (8 meshes) in this study; using this screen aperture resulted in the removal of approximately 47.2% Cu, 65.9% Zn, 26.5% Pb, 55.4% Ni and 58.8% Cd from the residues. Subsequent washing further reduces the heavy metal content in the residues larger than 2.36mm, with preferable conditions being 400rpm rotation speed, 5min washing duration and liquid-to-solid ratio of 25:1. The highest cumulative removal efficiencies of Cu, Zn, Pb, Ni and Cd after sieving and washing reached 81.1%, 61.4%, 75.8%, 97.2% and 72.7%, respectively. The combined sieving and washing process is environmentally friendly, can be used for the removal of heavy metals from the residues and has benefits in terms of heavy metal recycling. Copyright © 2014 Elsevier B.V. All rights reserved.

  20. The management of waste originating from the dismantling of nuclear power stations, a growth business that has yet to be optimized

    International Nuclear Information System (INIS)

    Cahen, B.

    2013-01-01

    The dismantling of a nuclear power plant consists of all the operations undertaken by the operator after the definitive shutdown, until such time that risks to humanity and the environment on the site are strictly limited or totally removed. Thus, the dismantling process may necessitate stripping and decontaminating a building which will be reusable, or it can go as far as the total demolition of machinery, equipment and structures. Cleaning up the land is an integral part of the dismantling brief. In France, dismantling requires prior authorization by government decree, after approval by the Nuclear Safety Authority. The decree stipulates the terms and nature of all the operations to be undertaken and the final state to be obtained by the operator. (author)

  1. Assessment of health risk of trace metal pollution in surface soil and road dust from e-waste recycling area in China.

    Science.gov (United States)

    Yekeen, Taofeek Akangbe; Xu, Xijin; Zhang, Yuling; Wu, Yousheng; Kim, Stephani; Reponen, Tiina; Dietrich, Kim N; Ho, Shuk-Mei; Chen, Aimin; Huo, Xia

    2016-09-01

    Informal recycling of e-waste and the resulting heavy metal pollution has become a serious burden on the ecosystem in Guiyu, China. In this investigation, we evaluated the trace metal concentration of community soil and road dust samples from 11 locations in Guiyu and 5 locations (consisting of residential areas, kindergarten/school, and farm field) in a reference area using graphite furnace atomic absorption spectrophotometer. The study spanned four seasons, 2012-2013, with a view to assess the risk associated with e-waste recycling in the study area. The concentrations of Pb, Cd, Cr, and Mn were 448.73, 0.71, 63.90, and 806.54 mg/kg in Guiyu soil and 589.74, 1.94, 69.71, and 693.74 mg/kg, in the dust, respectively. Pb and Cd values were significantly higher (P ≤ 0.05) than the reference area, and the mixed model analysis with repeated seasonal measurements revealed soil Pb and Cd levels that were 2.32 and 4.34 times, while the ratios for dust sample were 4.10 and 3.18 times higher than the reference area. Contamination factor, degree of contamination, and pollution load index indicated that all sampling points had a high level of metal contamination except farm land and kindergarten compound. The cumulative hazard index of Pb, Cd, Cr, and Mn for children in exposed area was 0.99 and 1.62 for soil and dust, respectively, suggesting non-cancer health risk potential. The significant accumulation of trace metals in the e-waste recycling area predisposes human life, especially children, to a potentially serious health risk.

  2. Assessment of health risk of trace metal pollution in surface soil and road dust from e-waste recycling area in China

    Science.gov (United States)

    Yekeen, Taofeek Akangbe; Xu, Xijin; Zhang, Yuling; Wu, Yousheng; Kim, Stephani; Reponen, Tiina; Dietrich, Kim N.; Ho, Shuk-mei; Chen, Aimin; Huo, Xia

    2017-01-01

    Informal recycling of e-waste and the resulting heavy metal pollution has become a serious burden on the ecosystem in Guiyu, China. In this investigation, we evaluated the trace metals concentration of community soil and road dust samples from 11 locations in Guiyu and 5 locations (consists of residential areas, kindergarten/school and farm field) in a reference area using graphite furnace atomic absorption spectrophotometer. The study spanned four seasons, 2012–2013, with a view to assess the risk associated with e-waste recycling in the study area. The concentration of Pb, Cd, Cr and Mn were 448.73, 0.71, 63.90 and 806.54 mg/kg in Guiyu soil and 589.74, 1.94, 69.71 and 693.74 mg/kg, in the dust, respectively. Pb and Cd values were significantly higher (P≤ 0.05) than the reference area and the mixed model analysis with repeated seasonal measurements revealed soil Pb and Cd levels that were 2.32 and 4.34 times, while the ratios for dust sample were 4.10 and 3.18 times higher than the reference area. Contamination factor, degree of contamination and pollution load index indicated that all sampling points had high level of metal contamination except farm land and kindergarten compound. The cumulative hazard index of Pb, Cd, Cr and Mn for children in exposed area was 0.99 and 1.62 for soil and dust respectively, suggesting non-cancer health risk potential. The significant accumulation of trace metals in the e-waste recycling area predisposes human life, especially children, to a potentially serious health risk. PMID:27230155

  3. LEP Dismantling - a first Step into New Era

    CERN Multimedia

    2000-01-01

    The aim of the project is to remove the LEP machine and most of the services from the underground areas in order to install the LHC within the time constraints of its civil engineering and installation programmes The dismantling of LEP will be the first project to be executed under the new INB (Installation Nucléaire de Base) convention for the LHC. This talk will give an overview of the LEP Dismantling project covering traceability, planning, infrastructure and execution. It will explain what it means for our accelerators to be classified as INB's and will introduce the changes in working and safety procedures, which will be enforced from the beginning of October. Note: The presentation will be made in French with the transparencies in English.

  4. Chemical and mechanical decontamination processes to minimize secondary waste decommissioning

    International Nuclear Information System (INIS)

    Enda, M.; Ichikawa, N.; Yaita, Y.; Kanasaki, T.; Sakai, H.

    2008-01-01

    In the decommissioning of commercial nuclear reactors in Japan, prior to the dismantling of the nuclear power plants, there are plans to use chemical techniques to decontaminate reactor pressure vessels (RPVs), internal parts, primary loop recirculation systems (PLRs), reactor water clean up systems (RWCUs), etc., so as to minimize radiation sources in the materials to be disposed of. After dismantling the nuclear power plants, chemical and mechanical decontamination techniques will then be used to reduce the amounts of radioactive metallic waste. Toshiba Corporation has developed pre-dismantling and post-dismantling decontamination systems. In order to minimize the amounts of secondary waste, the T-OZON process was chosen for decontamination prior to the dismantling of nuclear power plants. Dismantling a nuclear power plant results in large amounts of metallic waste requiring decontamination; for example, about 20,000 tons of such waste is expected to result from the dismantling of a 110 MWe Boiling Water Reactor (BWR). Various decontamination methods have been used on metallic wastes in preparation for disposal in consideration of the complexity of the shapes of the parts and the type of material. The materials in such nuclear power plants are primarily stainless steel and carbon steel. For stainless steel parts having simple shapes, such as plates and pipes, major sources of radioactivity can be removed from the surface of the parts by bipolar electrolysis (electrolyte: H 2 SO 4 ). For stainless steel parts having complicated shapes, such as valves and pumps, major sources of radioactivity can be removed from the surfaces by redox chemical decontamination treatments (chemical agent: Ce(IV)). For carbon steel parts having simple shapes, decontamination by blasting with zirconia grit is effective in removing major sources of radioactivity at the surface, whereas for carbon steel parts having complicated shapes, major sources of radioactivity can be removed from

  5. Storage - Nuclear wastes are overflowing

    International Nuclear Information System (INIS)

    Dupin, Ludovic

    2016-01-01

    This article highlights that the dismantling of French nuclear installations will generate huge volumes of radioactive wastes and that France may lack space to store them. The Cigeo project (underground storage) only concerns 0.2 per cent of the nuclear waste volume produced by France in 50 years. If storage solutions exist for less active wastes, they will soon be insufficient, notably because of the quantity of wastes produced by the dismantling of existing reactors and fuel processing plants. Different assessments of these volumes are evoked. In order to store them, the ANDRA made a second call for innovating projects which would enable a reduction of this volume by 20 to 30 per cent. The article also evokes projects selected after the first call for projects. They mainly focus on nuclear waste characterization which will result in a finer management of wastes regarding their storage destination. Cost issues and the opposition of anti-nuclear NGOs are still obstacles to the development of new sites

  6. Machine for dismantling metal parts

    Energy Technology Data Exchange (ETDEWEB)

    Prokopov, O.I.; Loginovskiy, V.I.; Yagudin, S.Z.

    1982-01-01

    The purpose of the invention is to reduce the outlays of time for dismantling metal parts under conditions of eliminating open gas and oil gushers in operational drilling. This goal is achieved because the machine for dismantling the metal parts is equipped with a set of clamping elements arranged on the chassis, where each of them has a drive.

  7. Metal Radioactive Waste Recycling from the Dismantling of Nuclear Facilities

    International Nuclear Information System (INIS)

    Fajt, B.; Prah, M.

    1996-01-01

    In the dismantling process of nuclear power plants a large amount of metal residues are generated. The residues of interest are stainless steel, copper and aluminium and can be reprocessed either for restricted or unrestricted use. Although there are many questions about the further use of these materials it should be convenient to recycle them. This paper discusses the complexity of the management of these metals. The radiation protection requirements are the most important principles. For these purposes great efforts in the decontamination have to be made. Regulatory aspects, clearance levels as well as characteristic of steel recycling industry, radiological impact and new developments are discussed. (author)

  8. LEP Dismantling: Wagons Roll!

    CERN Multimedia

    2001-01-01

    The first trucks transporting material from LEP and its four experiments left CERN on 31 January. Since the LEP dismantling operation began, the material had been waiting to be removed from the sites of the four experiments and the special transit area on the Prévessin site. On the evening of 30 January, the French customs authorities gave the green light for the transport operation to begin. So first thing the next day, the two companies in charge of recycling the material, Jaeger & Bosshard (Switzerland) and Excoffier (France), set to work. Only 1500 truckloads to go before everything has been removed!

  9. Radiation protection procedures for the dismantling and decontamination of nuclear facility

    International Nuclear Information System (INIS)

    Almeida, C.C.; Garcia, R.H.L.; Cambises, P.B.S.; Silva, T.M. da; Paiva, J.E.; Carneiro, J.C.G.G.; Rodrigues, D.L.

    2013-01-01

    This work presents the operational procedures and conditions to ensure the required level of protection and safety during the dismantling and decontamination of a natural uranium purification facility at IPEN-CNEN/SP, Brazil. The facility was designed for chemical processing of natural uranium, aiming to obtain the uranyl nitrate, nuclear-grade. Afterwards, the installation operated in treatment and washing of thorium sulfate and thorium oxycarbonate dissolution, to get thorium nitrate as final product. A global evaluation of the potential exposure situation was carried out by radioprotection team in order to carry out the operations planned. For the facility dismantling, was established both measures to control the radiation exposure at workplace and individual monitoring of workers. A combination of physical, chemical and mechanical methods was used in the decontamination procedure applied in this unit. Concerning the internal operation procedures of IPEN-CNEN/SP, the radioactive waste control, the transport of the radioactive materials and authorization of use of decontaminated equipment were also subject of study. (author)

  10. French processes for waste embedding. The use of epoxy resin for waste containment

    International Nuclear Information System (INIS)

    Augustin, X.; Gauthey, J.C.

    1993-01-01

    The low- and medium-level wastes generated by nuclear facilities when operating as well as during their decommissioning (dismantling, decontamination, etc.) are embedded for the purpose of obtaining a product suitable for disposal. Due to the varieties of waste produced, it was necessary to resort to multi-purpose techniques to solve problems relating to their embedding. The process for waste embedding in thermosetting polymer (polyester, epoxy) developed by the French Atomic Energy Commission (CEA) and its subsidiary TECHNICATOME is easy to operate and yields excellent results having regard to volume reduction and containment of radioisotopes (particularly caesium). The industrial development of this process has led to the design of small, flexible, fixed or mobile, embedding stations. Examples illustrating the increasing use of this process during facility dismantling are described

  11. Feedback from dismantling operations (level 2) on EDF's first generation reactors

    International Nuclear Information System (INIS)

    West, J P.; Dionisio-Gomes, A.; Kus, J P.; Mervaux, P.; Bernet, P.; Dalmas, R.

    2003-01-01

    next few years for all these facilities and (ii) the studies in progress that serve to prepare and commit to the operations for level 3 dismantling, according to the new programme. The analysis of the initial feedback allowed us to identify the following main orientations: - Importance of the visibility given to all those involved as regards the forecasting or overall scheduling of the operations. This visibility must therefore allow those involved to gain a better grasp of the files, or even to anticipate the actions or steps to be taken and concerns all those involved i.e. within EDF, the industrial firms, the Safety Authority, ANDRA, and other; - To a great extent, the success of the dismantling operations depends on the quality and the rigor of the work on site, at all stages of the operation, obviously including the clean-up phase and the requirement of quality or radiological cleanliness; - Success also requires considerable preparatory or anticipatory work, particularly with the Safety Authority. Anticipation is to be brought to bear on the upstream study of operations, for waste processing, as well as for the development of tools, methods and processes; - The importance, in terms of waste management, of considering the entire chain or 'process' to seek an overall economic optimum, including: zoning, characterisation, production (cutting up, sorting), intermediate storage, inspections, accreditation of the outlet to take charge of the waste concerned; - The need to make the individuals and the industrial firms involved accountable through the suitable allocation of operations. Following two years after the decision was taken to engage the new de-construction programme of the power plants that have ceased commercial operation, over a period of 25 years, and by giving visibility in the long term to all those involved, EDF considers that the conditions are favourably settled to achieve this programme under satisfactory industrial conditions of safety

  12. Concrete Waste Recycling Process for High Quality Aggregate

    International Nuclear Information System (INIS)

    Ishikura, Takeshi; Fujii, Shin-ichi

    2008-01-01

    Large amount of concrete waste generates during nuclear power plant (NPP) dismantling. Non-contaminated concrete waste is assumed to be disposed in a landfill site, but that will not be the solution especially in the future, because of decreasing tendency of the site availability and natural resources. Concerning concrete recycling, demand for roadbeds and backfill tends to be less than the amount of dismantled concrete generated in a single rural site, and conventional recycled aggregate is limited of its use to non-structural concrete, because of its inferior quality to ordinary natural aggregate. Therefore, it is vital to develop high quality recycled aggregate for general uses of dismantled concrete. If recycled aggregate is available for high structural concrete, the dismantling concrete is recyclable as aggregate for industry including nuclear field. Authors developed techniques on high quality aggregate reclamation for large amount of concrete generated during NPP decommissioning. Concrete of NPP buildings has good features for recycling aggregate; large quantity of high quality aggregate from same origin, record keeping of the aggregate origin, and little impurities in dismantled concrete such as wood and plastics. The target of recycled aggregate in this development is to meet the quality criteria for NPP concrete as prescribed in JASS 5N 'Specification for Nuclear Power Facility Reinforced Concrete' and JASS 5 'Specification for Reinforced Concrete Work'. The target of recycled aggregate concrete is to be comparable performance with ordinary aggregate concrete. The high quality recycled aggregate production techniques are assumed to apply for recycling for large amount of non-contaminated concrete. These techniques can also be applied for slightly contaminated concrete dismantled from radiological control area (RCA), together with free release survey. In conclusion: a technology on dismantled concrete recycling for high quality aggregate was developed

  13. Dismantling institutional racism: theory and action.

    Science.gov (United States)

    Griffith, Derek M; Mason, Mondi; Yonas, Michael; Eng, Eugenia; Jeffries, Vanessa; Plihcik, Suzanne; Parks, Barton

    2007-06-01

    Despite a strong commitment to promoting social change and liberation, there are few community psychology models for creating systems change to address oppression. Given how embedded racism is in institutions such as healthcare, a significant shift in the system's policies, practices, and procedures is required to address institutional racism and create organizational and institutional change. This paper describes a systemic intervention to address racial inequities in healthcare quality called dismantling racism. The dismantling racism approach assumes healthcare disparities are the result of the intersection of a complex system (healthcare) and a complex problem (racism). Thus, dismantling racism is a systemic and systematic intervention designed to illuminate where and how to intervene in a given healthcare system to address proximal and distal factors associated with healthcare disparities. This paper describes the theory behind dismantling racism, the elements of the intervention strategy, and the strengths and limitations of this systems change approach.

  14. Weapons dismantlement issues in independent Ukraine

    International Nuclear Information System (INIS)

    Zack, N.R.

    1995-01-01

    The American Association for the Advancement of Science sponsored a seminar during September 1993 in Kiev, Ukraine, titled, ''Toward a Nuclear-Free Future--Barriers and Problems.'' It brought together Ukrainians, Belarusians and Americans to discuss the legal, political, economic, technical, and safeguards and security dimensions of nuclear weapons dismantlement and destruction. US representatives initiated discussions on legal and treaty requirements and constraints, safeguards and security issues surrounding dismantlement, storage and disposition of nuclear materials, warhead transportation, and economic considerations. Ukrainians gave presentations on arguments for and against the Ukraine keeping nuclear weapons, the Ukrainian Parliament's nonapproval of START 1, alternative strategies for dismantling silos and launchers, and economic and security implications of nuclear weapons removal from the Ukraine. Participants from Belarus discussed proliferation and control regime issues. This paper will highlight and detail the issues, concerns and possible impacts of the Ukraine's dismantlement of its nuclear weapons

  15. Foam decontamination of large nuclear components before dismantling

    International Nuclear Information System (INIS)

    Costes, J.R.; Sahut, C.

    1998-01-01

    Following some simple theoretical considerations, the authors show that foam compositions can be advantageously circulated them for a few hours in components requiring decontamination before dismantling. The technique is illustrated on six large ferritic steel valves, then on austenitic steel heat exchangers for which the Ce(III)/Ce(IV) redox pair was used to dissolve the chromium; Ce(III) was reoxidized by ozone injection into the foam vector gas. Biodegradable surfactants are sued in the process; tests have shown that the foaming power disappears after a few days, provided the final radioactive liquid waste is adjusted to neutral pH, allowing subsequent coprecipitation of concentration treatment. (author)

  16. The concepts of the 'factory of the future' applied to cleanup and dismantling works

    International Nuclear Information System (INIS)

    Ghiban, A.; Girones, P.; Moitrier, C.; Gouhier, E.; Torreblanca, L.

    2016-01-01

    The 'factory of the future' relies on the implementation of new concepts and technologies like: connected robots, data analysis, virtual reality or enhanced reality in the fabrication processes. The article describes how these concepts can be used in cleanup or dismantling works. Both activities can be considered as the fabrication of a waste package and the processing plant as a factory. (A.C.)

  17. Extended storage of low-level radioactive waste: potential problem areas

    International Nuclear Information System (INIS)

    Siskind, B.; Dougherty, D.R.; MacKenzie, D.R.

    1985-01-01

    If a state or state compact does not have adequate disposal capacity for low-level radioactive waste (LLRW) by 1986 as required by the Low-Level Waste Policy Act, then extended storage of certain LLRW may be necessary. The issue of extended storage of LLRW is addressed in order to determine for the Nuclear Regulatory Commission the areas of concern and the actions recommended to resolve these concerns. The focus is on the properties and behavior of the waste form and waste container. Storage alternatives are considered in order to characterize the likely storage environments for these wastes. The areas of concern about extended storage of LLRW are grouped into two categories: 1. Behavior of the waste form and/or container during storage, e.g., radiolytic gas generation, radiation-enhanced degradation of polymeric materials, and corrosion. 2. Effects of extended storage on the properties of the waste form and/or container that are important after storage (e.g., radiation-induced oxidative embrittlement of high-density polyethylene and the weakening of steel containers resulting from corrosion by the waste). The additional information and actions required to address these concerns are discussed and, in particular, it is concluded that further information is needed on the rates of corrosion of container material by Class A wastes and on the apparent dose-rate dependence of radiolytic processes in Class B and C waste packages. Modifications to the guidance for solidified wastes and high-integrity containers in NRC's Technical Position on Waste Form are recommended. 27 references

  18. Failure prevention with stress measurement for dismantling of nuclear facilities. Final report

    International Nuclear Information System (INIS)

    Komber, T.; Reimche, W.; Bach, F.W.

    2003-07-01

    The dismantling of nuclear facilities is in progress since 20 years in Germany. Practical experiences in decommissioning have shown, that problem can occur during dismantling operations caused by release of residual stresses. In this case cutting parts or cutting tools get jammed if mechanical cutting techniques are used. The aim of this research work was to develop measuring techniques for the determination of the stress state in RPV, to predict the deformation during dismantling operations. This can serve as additional base for improved decommissioning planning and for time optimised dismantling. For determination of the stress state in components two small and inexpensive measuring techniques were new designed, for remote-controlled on-site use in atmosphere and under water. For the nondestructive determination of the directional stress state, based on the magnetostriction and the Harmonic-Analysis of alternating magnetic fields, a new developed rotating sensor is in use with a principal magnetisation direction. Because of the mainly isotropic material properties and the directional stresses, measured Harmonic values are influenced mainly by the stress state in the surface areas. In this way it is possible to determine the stress state qualitatively and the direction of principal stresses in the surface areas of the component. As an alternative to the established wire strain gauge, which remote-controlled application is still not possible under water, a new slot jet cutting strain control technique was designed. This technique detects the deformation in the surface after stresses are cut free by a water jet. So the stress state could be determined quantitatively in the surface and assessed in the depth. With the help of these two measuring techniques it is possible to characterize the stress state along a planned cutting line. The use of an adapted FEM simulation enables to calculate and determine the deformation of the cutting gap beforehand. These information

  19. Dismantling Experiment of Mock-up Tube Bundle of Steam Generator

    International Nuclear Information System (INIS)

    Kim, Sung Kyun; Lee, Kune Woo

    2010-01-01

    A SG (steam generator) is one of the biggest decommissioning components in nuclear power plants and one has been replaced 2∼6 times during the whole operation of a nuclear power plant. The old SG should be decommissioned for the purpose of the volume reduction of radioactive waste. Among the components of SG, the tube bundle is one of the most difficult items to be dismantled due to the fact that it is very hard to cut since it is made of Inconel 600 which has high resistance of corrosion and abrasion. Moreover, All cutting process should be performed by remotely since radioactive contamination of the internal surface of SG tubes is very high (about 150,000∼300,000 Bq/cm 2 ). Therefore, it is necessary to choose the appropriate cutting methods by the pros and cons analysis for candidate dismantling technologies and to do experiment study for the validation. In this study, the results of cutting experiment for a mock-up bundle by using band saw cutting method are described herein

  20. Remote Fiber Laser Cutting System for Dismantling Glass Melter - 13071

    Energy Technology Data Exchange (ETDEWEB)

    Mitsui, Takashi; Miura, Noriaki [IHI Corporation, 1 Shin-Nakahara-cho, Isogo-ku, Yokohama, Kanagawa (Japan); Oowaki, Katsura; Kawaguchi, Isao [IHI Inspection and Instrumentation Co., Ltd, 1 Shin-Nakahara-cho, Isogo-ku, Yokohama, Kanagawa (Japan); Miura, Yasuhiko; Ino, Tooru [Japan Nuclear Fuel Limited, 4-108, Aza Okitsuke, Oaza Obuchi, Rokkasho-Mura, Kamikita-gun, Aomori (Japan)

    2013-07-01

    Since 2008, the equipment for dismantling the used glass melter has been developed in High-level Liquid Waste (HLW) Vitrification Facility in the Japanese Rokkasho Reprocessing Plant (RRP). Due to the high radioactivity of the glass melter, the equipment requires a fully-remote operation in the vitrification cell. The remote fiber laser cutting system was adopted as one of the major pieces of equipment. An output power of fiber laser is typically higher than other types of laser and so can provide high-cutting performance. The fiber laser can cut thick stainless steel and Inconel, which are parts of the glass melter such as casings, electrodes and nozzles. As a result, it can make the whole of the dismantling work efficiently done for a shorter period. Various conditions of the cutting test have been evaluated in the process of developing the remote fiber cutting system. In addition, the expected remote operations of the power manipulator with the laser torch have been fully verified and optimized using 3D simulations. (authors)

  1. 2016 Waste Management Monitoring Report Area 3 and Area 5 Radioactive Waste Management Sites

    Energy Technology Data Exchange (ETDEWEB)

    Black, David [National Security Technologies, LLC. (NSTec), Mercury, NV (United States)

    2017-08-30

    Environmental monitoring data are collected at and around the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) within the Nevada National Security Site (NNSS). These data include direct radiation exposure, as well as radiation from the air, groundwater, meteorology, and vadose zone. This report summarizes the 2016 environmental data to provide an overall evaluation of RWMS performance and to support environmental compliance and performance assessment (PA) activities. Some of these data (e.g., radiation exposure, air, and groundwater) are presented in other reports, developed by National Security Technologies, LLC Direct radiation monitoring data indicate exposure levels at the RWMSs are within the range of background levels measured at the NNSS. Slightly elevated exposure levels outside the Area 3 RWMS are attributed to nearby historical aboveground nuclear weapons tests. Air monitoring data show that tritium concentrations in water vapor and americium and plutonium concentrations in air particles are below Derived Concentration Standards for these radionuclides. Groundwater monitoring data indicate the groundwater in the uppermost aquifer beneath the Area 5 RWMS is not impacted by RWMS operations. Results of groundwater analysis from wells around the Area 5 RWMS were all below established investigation levels. Leachate samples collected from the leachate collection system at the mixed low-level waste cell were below established contaminant regulatory limits. During 2016, precipitation at the Area 3 RWMS was 8% below average, and precipitation at the Area 5 RWMS was 8% above average. Water balance measurements indicate that evapotranspiration from the vegetated weighing lysimeter dries the soil and prevents downward percolation of precipitation more effectively than evaporation as measured from the bare-soil weighing lysimeter. Vadose zone monitoring on Area 5 and Area 3 RWMS cell covers shows no evidence of precipitation percolating through the covers

  2. Nevada Test Site 2005 Waste Management Monitoring Report Area 3 and Area 5 Radioactive Waste Management Sites

    International Nuclear Information System (INIS)

    David B. Hudson, Cathy A. Wills

    2006-01-01

    Environmental monitoring data were collected at and around the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) at the Nevada Test Site. These data are associated with radiation exposure, air, groundwater, meteorology, vadose zone, subsidence, and biota. This report summarizes the 2005 environmental data to provide an overall evaluation of RWMS performance and to support environmental compliance and performance assessment activities. Some of these data (e.g., radiation exposure, air, and groundwater) are presented in other reports (U.S. Department of Energy, 2005; Grossman, 2005; Bechtel Nevada, 2006). Direct radiation monitoring data indicate that exposure levels around the RWMSs are at or below background levels. Air monitoring data at the Area 3 and Area 5 RWMSs indicate that tritium concentrations are slightly above background levels. There is no detectable man-made radioactivity by gamma spectroscopy, and concentrations of americium and plutonium are only slightly above detection limits at the Area 3 RWMS. Measurements at the Area 5 RWMS show that radon flux from waste covers is no higher than natural radon flux from undisturbed soil in Area 5. Groundwater monitoring data indicate that the groundwater in the uppermost aquifer beneath the Area 5 RWMS is not impacted by facility operations. Precipitation during 2005 totaled 219.1 millimeters (mm) (8.63 inches [in.]) at the Area 3 RWMS and 201.4 mm (7.93 in.) at the Area 5 RWMS. Soil-gas tritium monitoring continues to show slow subsurface migration consistent with previous results. Moisture from precipitation at Area 5 has percolated to the bottom of the bare-soil weighing lysimeter, but this same moisture has been removed from the vegetated weighing lysimeter by evapotranspiration. Vadose zone data from the operational waste pit covers show that precipitation from the fall of 2004 and the spring of 2005 infiltrated past the deepest sensors at 188 centimeters (6.2 feet) and remains in the pit cover

  3. Utilization of External Capacities as an Integral Component of Concepts for Residues and Dismantling Using the Example of the CARLA Plant. National and International Experiences in Recycling

    International Nuclear Information System (INIS)

    Kluth, Thomas

    2014-01-01

    In Germany, nuclear industry has impressively demonstrated that decommissioning and dismantling of nuclear installations are technologically feasible tasks. From numerous projects, already concluded as well as still in process, substantial experiences could be gained which shall find their way into future strategies for decommissioning and dismantling. The overhasty and uncoordinated change in national energy policy, willingly called 'energy turnaround', will inevitably lead to a real wave of decommissioning projects. Mastering these will only be possible by consistently implementing the available pool of experiences. Future dismantling strategies will have to design the interaction between dismantling and treatment of residues in a much more flexible way in order to perform the whole dismantling process more efficiently. The more intensive utilization of external capacities for the treatment of residues can make a relevant essential contribution. By the CARLA plant Siempelkamp offers such a safe and reliable component for every dismantling project, based on a proven and tested past while continuously developing for the future. Until today, more than 28,000 tons of radioactive metals could be processed in the CARLA plant and subsequently could be harmlessly recycled to a large extent. Over the time, the offered scope of service has constantly been expanded. In the separation and cutting area components with dimensions of up to the size of a 40' container can be treated by thermal as well as mechanical separation methods. The outside storage area for containers with a capacity of approx. 150 pieces of 20' containers along with the authorized storage period for delivered material of 3 years enables us to react very flexibly to all project situations and by buffer storage customer specific campaigns of sufficient size can be arranged. In April 2012, the decontamination capacity could be clearly extended by commissioning of a new decontamination

  4. Decontamination and dismantling at the CEA

    International Nuclear Information System (INIS)

    2006-01-01

    This document presents the dismantling policy at the CEA (French Research Center on the atomic energy), the financing of the decontamination and the dismantling, the regulatory framework, the knowledge and the technology developed at the CEA, the radiation protection, the environment monitoring and the installations. (A.L.B.)

  5. Systems analysis of radiation safety during dismantling of power-plant equipment at a nuclear power station

    International Nuclear Information System (INIS)

    Bylkin, B.K.; Shpitser, V.Ya.

    1993-01-01

    A systems analysis of the radiation safety makes possible an ad hoc determination of the elements forming the system, as well as the establishment of the characteristics of their interaction with radiation-effect factors. Here the authors will present part of the hierarchical analysis procedure, consisting in general of four separate procedures. The purpose is to investigate and analyze the mean and stable (on the average) indices of radiation safety, within the framework of alternative mathematical models of dismantling the power-plant equipment of a nuclear power station. The following three of the four procedures are discussed: (1) simulated projection, of the processing of radioactive waste; (2) analysis of the redistribution of radionuclides during the industrial cycle of waste treatment; (3) planning the collective dose load during the dismantling operation. Within the framework of the first of these procedures, the solutions to the problem of simulating a waste-treatment operation of maximum efficiency are analyzed. This analysis is based on the use of a data base for the parameters of the installations, assemblies, and equipment, enabling the integration of these in a simulation of a complex automated facility. The results were visualized in an AUTOCAD-10 medium using a graphical data base containing an explanation of the rooms

  6. Waste management strategy for cost effective and environmentally friendly NPP decommissioning

    Energy Technology Data Exchange (ETDEWEB)

    Per Lidar; Arne Larsson [Studsvik Nuclear AB (ndcon partner), Nykoping (Sweden); Niklas Bergh; Gunnar Hedin [Westinghouse Electric Sweden AB (ndcon partner), Vasteraas (Sweden)

    2013-07-01

    Decommissioning of nuclear power plants generates large volumes of radioactive or potentially radioactive waste. The proper management of the dismantling waste plays an important role for the time needed for the dismantling phase and thus is critical to the decommissioning cost. An efficient and thorough process for inventorying, characterization and categorization of the waste provides a sound basis for the planning process. As part of comprehensive decommissioning studies for Nordic NPPs, Westinghouse has developed the decommissioning inventories that have been used for estimations of the duration of specific work packages and the corresponding costs. As part of creating the design basis for a national repository for decommissioning waste, the total production of different categories of waste packages has also been predicted. Studsvik has developed a risk based concept for categorization and handling of the generated waste using six different categories with a span from extremely small risk for radiological contamination to high level waste. The two companies have recently joined their skills in the area of decommissioning on selected market in a consortium named ndcon to further strengthen the proposed process. Depending on the risk for radiological contamination or the radiological properties and other properties of importance for waste management, treatment routes are proposed with well-defined and proven methods for on-site or off-site treatment, activity determination and conditioning. The system is based on a graded approach philosophy aiming for high confidence and sustainability, aiming for re-use and recycling where found applicable. The objective is to establish a process where all dismantled material has a pre-determined treatment route. These routes should through measurements, categorization, treatment, conditioning, intermediate storage and final disposal be designed to provide a steady, un-disturbed flow of material to avoid interruptions. Bottle

  7. Waste management strategy for cost effective and environmentally friendly NPP decommissioning

    International Nuclear Information System (INIS)

    Per Lidar; Arne Larsson; Niklas Bergh; Gunnar Hedin

    2013-01-01

    Decommissioning of nuclear power plants generates large volumes of radioactive or potentially radioactive waste. The proper management of the dismantling waste plays an important role for the time needed for the dismantling phase and thus is critical to the decommissioning cost. An efficient and thorough process for inventorying, characterization and categorization of the waste provides a sound basis for the planning process. As part of comprehensive decommissioning studies for Nordic NPPs, Westinghouse has developed the decommissioning inventories that have been used for estimations of the duration of specific work packages and the corresponding costs. As part of creating the design basis for a national repository for decommissioning waste, the total production of different categories of waste packages has also been predicted. Studsvik has developed a risk based concept for categorization and handling of the generated waste using six different categories with a span from extremely small risk for radiological contamination to high level waste. The two companies have recently joined their skills in the area of decommissioning on selected market in a consortium named ndcon to further strengthen the proposed process. Depending on the risk for radiological contamination or the radiological properties and other properties of importance for waste management, treatment routes are proposed with well-defined and proven methods for on-site or off-site treatment, activity determination and conditioning. The system is based on a graded approach philosophy aiming for high confidence and sustainability, aiming for re-use and recycling where found applicable. The objective is to establish a process where all dismantled material has a pre-determined treatment route. These routes should through measurements, categorization, treatment, conditioning, intermediate storage and final disposal be designed to provide a steady, un-disturbed flow of material to avoid interruptions. Bottle

  8. SGDES: Management system dismantling of ENRESA; SGDES: Sistema de gestion de desmantelamiento de ENRESA

    Energy Technology Data Exchange (ETDEWEB)

    Julian, A. de; Fernandez, M.; Vidaechea, S.

    2013-07-01

    ENRESA, the Spanish public company responsible for managing radioactive waste and nuclear facilities decommissioning, has developed a management information system (SGDES) for the decommissioning of nuclear power plants. Dismantling activities require a rigorous operations control within highly specialized, process systematization and safety framework, both under human and technological point of view. SGDES system is capable of responding to the mentioned operational needs, efficiently and safely.

  9. Development of treatment technology for radioactive concrete wastes

    Energy Technology Data Exchange (ETDEWEB)

    Min, B. Y.; Choi, W. K.; Lee, K. W., E-mail: bymin@kaeri.re.k [Korea Atomic Energy Research Institute, 1045 Daeduk-daero, Yuseong-gu, Daejeon, 305-353 Republic of Korea (Korea, Republic of)

    2010-10-15

    The aim of this study was the separation of clean aggregates from contaminated dismantling concrete wastes by thermal and mechanical processes. In Korea, the decontamination and decommissioning of the retired Korea research reactor (KRR) and a uranium conversion plant (UCP) at the Korea Atomic Energy Research Institute (KAERI) has been under way. Hundreds of tons of concrete wastes are expected from these facilities. The KAERI has developed volume reduction technology applicable to an activated heavy concrete waste generated by dismantling KRR-2 and a uranium contaminated light weight concrete produced from a UCP. Contamination level of the gravel and sand aggregates was remarkably decreased by thermal and mechanical process. The volume reduction rate could be achieved above 70% for KRR-2 concrete waste and above to 80% for the UCP concrete waste. (Author)

  10. Rockwell International Hot Laboratory decontamination and dismantlement interim progress report 1987-1996

    International Nuclear Information System (INIS)

    None

    1997-01-01

    OAK A271 Rockwell International Hot Laboratory decontamination and dismantlement interim progress report 1987-1996. The Rockwell International Hot Laboratory (RIHL) is one of a number of former nuclear facilities undergoing decontamination and decommissioning (D and D) at the Santa Susana Field Laboratory (SSFL). The RIHL facility is in the later stages of dismantlement, with the final objective of returning the site location to its original natural state. This report documents the decontamination and dismantlement activities performed at the facility over the time period 1988 through 1996. At this time, the support buildings, all equipment associated with the facility, and the entire above-ground structure of the primary facility building (Building 020) have been removed. The basement portion of this building and the outside yard areas (primarily asphalt and soil) are scheduled for D and D activities beginning in 1997

  11. The conceptual solutions concerning decommissioning and dismantling of Russian civil nuclear powered ships

    International Nuclear Information System (INIS)

    Kulikov, Konstantin N.; Nizamutdinov, Rinat A.; Abramov, Andrey N.

    2013-01-01

    From 1959 up to 1991 nine civil nuclear powered ships were built in Russia: eight ice-breakers and one lash lighter carrier (cargo ship). At the present time three of them were taking out of service: ice-breaker 'Lenin' is decommissioned as a museum and is set for storage in the port of Murmansk, nuclear ice-breakers 'Arktika' and 'Sibir' are berthing. The ice-breakers carrying rad-wastes appear to be a possible source of radiation contamination of Murmansk region and Kola Bay because the ship long-term storage afloat has the negative effect on hull's structures. As the result of this under the auspices of the Federal Targeted Program 'Nuclear and Radiation Safety of Russia for 2008 and the period until 2015' the conception and projects of decommissioning of nuclear-powered ships are developed by the State corporation Rosatom with the involvement of companies of United Shipbuilding Corporation. In developing the principal provisions of conception of decommissioning and dismantling of icebreakers the technical and economic assessment of dismantling options in ship-repairing enterprises of North-West of Russia was performed. The paper contains description of options, research procedure, analysis of options of decommissioning and dismantling of nuclear ice-breakers, taking into account the principle of optimization of potential radioactive effect to personnel, human population and environment. The report's conclusions contain the recommendations for selection of option for development of nuclear icebreaker decommissioning and dismantling projects. (authors)

  12. BRET fuel assembly dismantling machine

    International Nuclear Information System (INIS)

    Titzler, P.A.; Bennett, K.L.; Kelley, R.S. Jr.; Stringer, J.L.

    1984-08-01

    An automated remote nuclear fuel assembly milling and dismantling machine has been designed, developed, and demonstrated at the Hanford Engineering Development Laboratory (HEDL) in Richland, Washington. The machine can be used to dismantle irradiated breeder fuel assemblies from the Fast Flux Test Facility prior to fuel reprocessing. It can be installed in an existing remotely operated shielded hot cell facility, the Fuels and Materials Examination Facility (FMEF), at the Hanford Site in Richland, Washington

  13. Decommissioning, Dismantling and Disarming: a Unique Information Showroom Inside the G2 Reactor at Marcoule Centre (France) - 12068

    Energy Technology Data Exchange (ETDEWEB)

    Volant, Emmanuelle [CEA DAM, Bruyeres-le-Chatel (France); Garnier, Cedric [CEA DEN, Marcoule (France)

    2012-07-01

    a future national storage facility for irradiated graphite waste. Then, the paper recalls communication events and official visits hosted in Pierrelatte and Marcoule, following a formal invitation from the French President Mr. Nicolas Sarkozy. These visits, which were organized in order to illustrate the irreversibility of these dismantling operations, allowed visitors to discovers places that used to be former highly classified areas. Three official visits were organized in 2008 and 2009 for representatives of the Conference on Disarmament Member States, non-governmental experts and journalists. All participants visited the dismantled uranium enrichment plant in Pierrelatte, the G2 reactor and the UP1 plant in Marcoule. The visits were successful and visitors were especially impressed by the G2 reactor and its massive industrial architecture, symbolic of the early ages of nuclear history. In late 2010, this feedback convinced CEA Military Application Directorate (CEA DAM) that a permanent showroom could be installed inside the reactor, making it possible to preserve the cultural value of this historical landmark, and to continue its ongoing effort of communication and outreach. The paper explains the design of this concept: the museography project with a professional designer, the communication material conception and the features of such an original place. (authors)

  14. History and environmental setting of LASL near-surface land disposal facilities for radioactive wastes (Areas A, B, C, D, E, F, G, and T). A source document

    International Nuclear Information System (INIS)

    Rogers, M.A.

    1977-06-01

    The Los Alamos Scientific Laboratory (LASL) has been disposing of radioactive wastes since 1944. The LASL Materials Disposal Areas examined in this report, Areas A, B, C, D, E, F, G, and T, are solid radioactive disposal areas with the exception of Area T which is a part of the liquid radioactive waste disposal operation. Areas A, G, and T are currently active. Environmental studies of and monitoring for radioactive contamination have been done at LASL since 1944

  15. History and environmental setting of LASL near-surface land disposal facilities for radioactive wastes (Areas A, B, C, D, E, F, G, and T). A source document

    Energy Technology Data Exchange (ETDEWEB)

    Rogers, M.A.

    1977-06-01

    The Los Alamos Scientific Laboratory (LASL) has been disposing of radioactive wastes since 1944. The LASL Materials Disposal Areas examined in this report, Areas A, B, C, D, E, F, G, and T, are solid radioactive disposal areas with the exception of Area T which is a part of the liquid radioactive waste disposal operation. Areas A, G, and T are currently active. Environmental studies of and monitoring for radioactive contamination have been done at LASL since 1944.

  16. Characterization of radioactive graphite and concrete of the reactor ULYSSE/INSTN at CEA/Saclay to be dismantled

    International Nuclear Information System (INIS)

    Van Lauwe, Aymeric; Ridikas, Danas; Damoy, Francois; Blideanu, Valentin; Fajardo, Christophe; Aubert, Marie-Cecile; Foulon, Francois

    2006-01-01

    Decommissioning and dismantling of nuclear installations after their service life are connected with the necessity of the disassembling, handling and disposing of a large amount of radioactive material. In order to optimize the disassembling operations, to reduce the undesirable volume to the minimum and to successfully plan the dismantling and disposal of radioactive materials to storage facilities, the radiological characterisation of the material present in the reactor and around its environment should be accurately evaluated. The present work has been done in the framework of the decommissioning and dismantling of the experimental reactor ULYSSE that is presently operating in INSTN/Saclay and will be closed in the middle of 2006. A methodology, already successfully used for another research reactor, is proposed for determining accurately the long-term induced activity of the materials present in the active reactor core and its surroundings. The comparison of theoretical predictions, based on Monte Carlo technique, with experimental values validated the approach and the methodology used in the present study. The goal is to plan efficiently the disassembling and dismantling of the system and to optimise the mass flow going to different waste repositories. We show that this approach might reduce substantially the total cost of decommissioning. (authors)

  17. Dismantlement and removal of Old Hydrofracture Facility bulk storage bins and water tank, Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1998-03-01

    The Old Hydrofracture Facility (OHF), located at Oak Ridge National Laboratory (ORNL), was constructed in 1963 to allow experimentation and operations with an integrated solid storage, mixing, and grout injection facility. During its operation, OHF blended liquid low-level waste with grout and used a hydrofracture process to pump the waste into a deep low-permeable shale formation. Since the OHF Facility was taken out of service in 1980, the four bulk storage bins located adjacent to Building 7852 had deteriorated to the point that they were a serious safety hazard. The ORNL Surveillance and Maintenance Program requested and received permission from the US Department of Energy to dismantle the bins as a maintenance action and send the free-released metal to an approved scrap metal vendor. A 25,000-gal stainless steel water tank located at the OHF site was included in the scope. A fixed-price subcontract was signed with Allied Technology Group, Inc., to remove the four bulk storage bins and water tank to a staging area where certified Health Physics personnel could survey, segregate, package, and send the radiologically clean scrap metal to an approved scrap metal vendor. All radiologically contaminated metal and metal that could not be surveyed was packaged and staged for later disposal. Permissible personnel exposure limits were not exceeded, no injuries were incurred, and no health and safety violations occurred throughout the duration of the project. Upon completion of the dismantlement, the project had generated 53,660 lb of clean scrap metal (see Appendix D). This resulted in $3,410 of revenue generated and a cost avoidance of an estimated $100,000 in waste disposal fees

  18. Decommissioning and Dismantling of the Floating Maintenance Base 'Lepse' - 13316

    Energy Technology Data Exchange (ETDEWEB)

    Field, D.; Mizen, K. [Nuvia Limited (United Kingdom)

    2013-07-01

    The Lepse was built in Russia in 1934 and commissioned as a dry cargo ship. In 1961 she was re-equipped for use as a nuclear service ship (NSS), specifically a floating maintenance base (FMB), to support the operation of the civilian nuclear fleet (ice-breakers) of the USSR. In 1988 Lepse was taken out of service and in 1990 she was re-classified as a 'berth connected ship', located at a berth near the port of Murmansk under the ownership of Federal State Unitary Enterprise (FSUE) Atomflot. Lepse has special storage facilities for spent nuclear fuel assemblies (SFA) that have been used to store several hundred SFAs for nearly 40 years. High and intermediate-level liquid radioactive waste (LRW) is also present in the spent nuclear fuel assembly storage channels, in special tanks and also in the SFA cooling circuit. Many of the SFAs stored in Lepse are classified as damaged and cannot be removed using standard procedures. The removal of the SFA and LRW from the Lepse storage facilities is a hazardous task and requires specially designed tools, equipment and an infrastructure in which these can be deployed safely. Lepse is a significant environmental hazard in the North West of Russia. Storing spent nuclear fuel and high-level liquid radioactive waste on board Lepse in the current conditions is not acceptable with respect to Russian Federation health, safety and environmental standards and with international best practice. The approved concept design for the removal of the SFA and LRW and dismantling of Lepse requires that the ship be transported to Nerpa shipyard where specialist infrastructure will be constructed and equipment installed. One of the main complexities of the Project lies within the number of interested stakeholders involved in the Project. The Lepse project has been high focus on the international stage for many years with previous international efforts failing to make significant progress towards the objective of decommissioning Lepse. The

  19. EL-3 dismantling of an experimental reactor

    International Nuclear Information System (INIS)

    1989-01-01

    The EL3 experimental reactor has been definitively stopped in march 1979. Its decommissioning has been pronounced in the end of 1982. This article is consecrated at decontamination and dismantling works necessited by its passage at the dismantling level 2 [fr

  20. Radioactive waste management of urban area

    International Nuclear Information System (INIS)

    Huang, Z.; Gu, S.X.

    1993-01-01

    The several years experience of radioactive waste management in Shanghai of China shows that the centralized management is quite successful and effective. Rad waste generated in urban area would be treated with further concern in the respect of radiation and environmental protection. In this respect, there is a need for a professional organisation to undertake the necessary regulation, and demonstrate that high standards of design, planning, management and operation could be met. The experience in China is suitable to manage and dispose rad waste generated from the civil applications in urban area, and valuable to the developing country and area in particular. It is concluded that the centralized management of intermediate level and low level radioactive waste is an optimum choice for urban area

  1. Solving the E-waste problem (StEP) green paper. E-waste country study Ethiopia

    Energy Technology Data Exchange (ETDEWEB)

    Manhart, Andreas [Oeko-Institut, Inst. fuer Angewandte Oekologie e.V., Freiburg im Breisgau (Germany); Amera, Tadesse; Belay, Mehari [PAN (Ethiopia)

    2013-04-10

    The generation and management of waste electrical and electronic equipment (e-waste) is an increasing concern in many African countries. Attempts to bridge the digital divide as well as rapid economic development continue to boost the market penetration of many types of electricity powered devices. This also leads to rapidly increasing e-waste volumes, which are mostly not yet managed in an environmentally sound manner. In order to build a strong foundation for the development of Ethiopia's e-waste management strategy, it was deemed necessary to generate reliable data on e-waste volumes and current management practices and options, as well as to investigate possibilities for improved e-waste management and other relevant aspects. This study, financed by the Solving the E-waste Problem (StEP) Initiative under a grant of the United States Environmental Protection Agency (US-EPA), was jointly carried out by the Oeko-Institut e.V. and PAN-Ethiopia. It aims to fill key knowledge gaps and provide a more solid base for further decision making for both, national decision-makers and co-operation projects in this field. The information contained in this report is derived from existing literature sources and statistics, interviews conducted in Ethiopia, and field assessments in Addis Ababa in August 2012.

  2. Control and treating technique of the nuclear wastes

    International Nuclear Information System (INIS)

    Ohira, Shigeru; Hayashi, Takumi

    1997-01-01

    In the large scale tritium treating and producing facilities such as ITER and others, they are presumed by absorbing, solving and diffusing tritium to various materials to be polluted instruments and equipments to become wastes by their partial or whole exchanges, recoveries, modifications, dismantlements and so forth. From a viewpoint of safety for the tritium, the following operations seem to be important among changing a part or whole of the objective instruments and equipments to wastes with finally disposable forms: to reduce the tritium remained volume as much as possible before the operations of exchange, dismantlement and so on, from viewpoint of risk reduction of the tritium emission into operation environment and outer environment; to reduce the tritium emission into the operation environment and circumference environment at operations of exchange, dismantlement and so on; to reduce the tritium leakage from the waste in storage and transportation before treatment; to protect the tritium pollution expansion at mechanical treatment processes such as cutting, pressing and so forth; and to reduce sufficiently the tritium concentration in the wastes to be disposed by proper treatment on a base of spirit of ALARA. (G.K.)

  3. KONTEC 2009. Report about the 9th International Symposium on ''Conditioning of radioactive operational and decommissioning wastes''

    International Nuclear Information System (INIS)

    Anon.

    2009-01-01

    ''Kontec 2009'' was organized in Dresden on April 15-17, 2009. For the 8 th time, this established international meeting covered the subjects of ''Conditioning of Radioactive Operational and Decommissioning Wastes'' and ''Decommissioning and Dismantling of Nuclear Facilities'' and the R and D Status Report delivered by the German Federal Ministry for Education and Research on this key topic. Some 790 participants from 13 countries heard and discussed the contributions to the three-day meeting. The program of the symposium comprised plenary sessions dealing with these 4 key subjects: Disposal of Radioactive Residues from Nuclear Facilities' Operation and Decommissioning, Decommissioning and Dismantling of Nuclear Facilities, Facilities and Systems for the Conditioning of Operational and Decommissioning Wastes, Transport, Interim and Final Storage of Non-heat Generating Wastes (i.e. Konrad). The sessions were supplemented by poster sessions and selected short presentations under the heading of ''Kontec Direct.'' (orig.)

  4. Closure Report for Corrective Action Unit 143: Area 25 Contaminated Waste Dumps, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    Tobiason, D. S.

    2002-01-01

    This Closure Report (CR) has been prepared for the Area 25 Contaminated Waste Dumps (CWD), Corrective Action Unit (CAU) 143 in accordance with the Federal Facility Agreement and Consent Order [FFACO] (FFACO, 1996) and the Nevada Division of Environmental Protection (NDEP)-approved Corrective Action Plan (CAP) for CAU 143: Area 25, Contaminated Waste Dumps, Nevada Test Site, Nevada. CAU 143 consists of two Corrective Action Sites (CASs): 25-23-09 CWD No.1, and 25-23-03 CWD No.2. The Area 25 CWDs are historic disposal units within the Area 25 Reactor Maintenance, Assembly, and Disassembly (R-MAD), and Engine Maintenance, Assembly, and Disassembly (E-MAD) compounds located on the Nevada Test Site (NTS). The R-MAD and E-MAD facilities originally supported a portion of the Nuclear Rocket Development Station in Area 25 of the NTS. CWD No.1 CAS 25-23-09 received solid radioactive waste from the R-MAD Compound (East Trestle and West Trench Berms) and 25-23-03 CWD No.2 received solid radioactive waste from the E-MAD Compound (E-MAD Trench)

  5. Nuclear waste forms for actinides

    Science.gov (United States)

    Ewing, Rodney C.

    1999-01-01

    The disposition of actinides, most recently 239Pu from dismantled nuclear weapons, requires effective containment of waste generated by the nuclear fuel cycle. Because actinides (e.g., 239Pu and 237Np) are long-lived, they have a major impact on risk assessments of geologic repositories. Thus, demonstrable, long-term chemical and mechanical durability are essential properties of waste forms for the immobilization of actinides. Mineralogic and geologic studies provide excellent candidate phases for immobilization and a unique database that cannot be duplicated by a purely materials science approach. The “mineralogic approach” is illustrated by a discussion of zircon as a phase for the immobilization of excess weapons plutonium. PMID:10097054

  6. A systematic review of the human body burden of e-waste exposure in China.

    Science.gov (United States)

    Song, Qingbin; Li, Jinhui

    2014-07-01

    As China is one of the countries facing the most serious pollution and human exposure effects of e-waste in the world, much of the population there is exposed to potentially hazardous substances due to informal e-waste recycling processes. This report reviews recent studies on human exposure to e-waste in China, with particular focus on exposure routes (e.g. dietary intake, inhalation, and soil/dust ingestion) and human body burden markers (e.g. placenta, umbilical cord blood, breast milk, blood, hair, and urine) and assesses the evidence for the association between such e-waste exposure and the human body burden in China. The results suggest that residents in the e-waste exposure areas, located mainly in the three traditional e-waste recycling sites (Taizhou, Guiyu, and Qingyuan), are faced with a potential higher daily intake of these pollutants than residents in the control areas, especially via food ingestion. Moreover, pollutants (PBBs, PBDEs, PCBs, PCDD/Fs, and heavy metals) from the e-waste recycling processes were all detectable in the tissue samples at high levels, showing that they had entered residents' bodies through the environment and dietary exposure. Children and neonates are the groups most sensitive to the human body effects of e-waste exposure. We also recorded plausible outcomes associated with exposure to e-waste, including 7 types of human body burden. Although the data suggest that exposure to e-waste is harmful to health, better designed epidemiological investigations in vulnerable populations, especially neonates and children, are needed to confirm these associations. Copyright © 2014 Elsevier Ltd. All rights reserved.

  7. Post-Closure Evaluation of the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada National Security Site in Support of the Site-Wide Environmental Impact Statement

    International Nuclear Information System (INIS)

    2011-01-01

    The post-closure performance of the Area 3 Radioactive Waste Management Site (RWMS) and Area 5 RWMS are evaluated for the Site-Wide Environmental Impact Statement using current performance assessment and composite analysis methods and models. Two alternatives with different future waste volumes and inventories are evaluated. The No Action Alternative evaluates the inventory disposed through fiscal year (FY) 2010 plus an additional 4.5E5 cubic meters (m3) (1.59E7 cubic feet (ft3)) of waste disposed at the Area 5 RWMS. The Expanded Operations Alternative evaluates the FY 2010 inventory plus an additional 1.42E6 m3 (5.03E7 ft3) of waste disposed at the Area 5 RWMS and 4.93E4 m3 (1.74E6 ft3) disposed at the Area 3 RWMS. Both the No Action and Expanded Operations Alternatives have a reasonable expectation of meeting all performance objectives of U.S. Department of Energy Order DOE O 435.1, 'Radioactive Waste Management.' No significant difference between the two alternatives was found because the waste concentrations are similar. The performance assessment model assesses radiological risk for residents at the RWMS boundary where risk is more closely related to waste concentration than total waste inventory. Results for the composite analysis also indicate that the dose constraint and dose limit can be met for both alternatives.

  8. Dismantling of Vandellos I

    International Nuclear Information System (INIS)

    Armada, J. R.

    2003-01-01

    Spain is witnessing the phase-out of a nuclear power plant. It is a unique experience in our country and therefore the dismantling work has been watched closely, not only from here but also from abroad. The Empresa Nacional de Residuos Radiactivos (ENRESA) is in charge of managing the dismantling and decommissioning work of the Vandellos-I nuclear power plant, located in the municipality of L'Hospitalet de l'Infant (Tarragona). the work began five years ago and has been executed on schedule. the appearance of what was one of the first Spanish commercial nuclear power plants has been changed radically to leave premises suitable for any other activity. (Author)

  9. STMI: several years of experience in nuclear plant dismantling

    International Nuclear Information System (INIS)

    Moreau, J.C.

    1985-01-01

    Since 1977, when STMI performed its first dismantling operation, the Company appreciably improved in that field through important operations: the dismantling of the calciothermy and fluoration metal Pu preparation facility, in La Hague reprocessing plant; the dismantling of the slag treatment chain, associated to calciothermy and fluoration processes, in La Hague reprocessing plant; and the cleaning of EL4 cell in Marcoule. To perform these operations, STMI's operating teams, on top of decontamination and dismantling technologies, strived to improve handling and transportation technologies, and to nuclearize many equipments. In order to increase its technical efficiency, STMI signed a cooperation agreement with FRAMATOME company. Therefore, the union between the operational know-hows of STMI and the design experience of TECHNICATOME allow the needs of any customs facing a dismantling case to be satisfied [fr

  10. Techniques for CAD reconstruction of 'as-built' environments and application to preparing for dismantling of plants

    International Nuclear Information System (INIS)

    Pot, J.; Levesque, P.

    1997-01-01

    Electricite de France is using CAD-generated numeric geometrical models to simulate maintenance operations and enable optimizing maintenance procedures. These models are also used to program the machines or robots for certain servicing procedures. They are used in the operator interfaces for robot control, and provide the operator with virtual cameras or enable generating specific information (such as virtual force feedback). Even more recently, CAD models have been integrated in what is known as 'virtual reality' software, giving the operators a sensation of 'immersion' in a virtual universe. Depending on the need and on the type of results expected from the simulations, one needs more or less precise models of the environment in which work will be performed. EDF is using several techniques to get 'as-built' models of the environments. This article describes the SOISIC system, which is a 3D laser sensor widely used for environment data acquisition, associated with 3Dipsos software, for CAD model reconstruction. These techniques, and the applications subsequently developed formaintenance applications, can be used in preparing and carrying out dismantling operations: 'as-built' CAD modeling of the installation can be used in the preparatory phase, providing plans, simulating the varioussteps, calculating waste volumes, helping in optimization of waste management, etc. These models can also be used during the actual dismantling process, to program the machines or robots used, or in the robot or machinesupervisory system. Some of the presented techniques have been used in a room in the Brennilis plant, which is currently being dismantled. (orig.)

  11. Attributes to facilitate e-waste recycling behaviour

    Directory of Open Access Journals (Sweden)

    Senawi Nur Hidayah

    2016-01-01

    Full Text Available This study aims to identify the set of attributes to facilitate electronic waste (e-waste behaviour among the community. E-waste disposal is increasing from year to year in parallel with increasing of global population. The short lifespan of electronics and poor e-waste recycling behaviour is among the main contributors to the steadily increasing of e-waste generated. Current recycling rate among the nation is lacking behind, which is only 10.5%. A questionnaire survey has been conducted among the students in Universiti Teknologi Malaysia to evaluate the current e-waste recycling practice. The results showed that majority of the respondents did not recycle their e-waste on campus. Aggressive efforts is needed to realize the country’s target of 20% recycling rate in year 2020, one of the effective paths is to minimize e-waste generation via active e-waste recycling behaviour among the community. Extensive literatures have been reviewed to classify the attributes to facilitate effective e-waste recycling among the community. Total of five attributes that identified in this study which are Convenience of E- waste Recycling Infrastruture and Services, E-waste Recycling Information, Incentives For E-waste Recycling, Reminder to Recycle E-waste And E-waste Recycling Infrastructure and Services. The set of attributes identified in this study may serve as guideline for the management in designing program to foster e-waste recycling behaviour among the community.

  12. Waste from dismantling the German experience

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    2014-07-15

    Since the 1970s, Germany has successfully conducted decomissioning projects on 16 prototype or commercial reactors, thereby gaining experience in the management of the associated waste, as explains Boris Brendebach, Chief Expert for Decommissioning at GRS' Radiation and Environmental Protection Division. (orig.)

  13. Sandia National Laboratories support of the Iraq Nuclear Facility Dismantlement and Disposal Program.

    Energy Technology Data Exchange (ETDEWEB)

    Cochran, John Russell; Danneels, Jeffrey John

    2009-03-01

    Because of past military operations, lack of upkeep and looting there are now enormous radioactive waste problems in Iraq. These waste problems include destroyed nuclear facilities, uncharacterized radioactive wastes, liquid radioactive waste in underground tanks, wastes related to the production of yellow cake, sealed radioactive sources, activated metals and contaminated metals that must be constantly guarded. Iraq currently lacks the trained personnel, regulatory and physical infrastructure to safely and securely manage these facilities and wastes. In 2005 the International Atomic Energy Agency (IAEA) agreed to organize an international cooperative program to assist Iraq with these issues. Soon after, the Iraq Nuclear Facility Dismantlement and Disposal Program (the NDs Program) was initiated by the U.S. Department of State (DOS) to support the IAEA and assist the Government of Iraq (GOI) in eliminating the threats from poorly controlled radioactive materials. The Iraq NDs Program is providing support for the IAEA plus training, consultation and limited equipment to the GOI. The GOI owns the problems and will be responsible for implementation of the Iraq NDs Program. Sandia National Laboratories (Sandia) is a part of the DOS's team implementing the Iraq NDs Program. This report documents Sandia's support of the Iraq NDs Program, which has developed into three principal work streams: (1) training and technical consultation; (2) introducing Iraqis to modern decommissioning and waste management practices; and (3) supporting the IAEA, as they assist the GOI. Examples of each of these work streams include: (1) presentation of a three-day training workshop on 'Practical Concepts for Safe Disposal of Low-Level Radioactive Waste in Arid Settings;' (2) leading GOI representatives on a tour of two operating low level radioactive waste disposal facilities in the U.S.; and (3) supporting the IAEA's Technical Meeting with the GOI from April 21

  14. Direction in charge of the management of wastes. 1998 activity report; Direction chargee de la gestion des dechets. Rapport d'activite 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-07-01

    This document is the 1998 activity report of the direction in charge of the management of radioactive wastes (DGD) of the French atomic energy commission (CEA). The role of the DGD is the elimination of radioactive wastes, the management of spent fuels, the cleansing and dismantling of shut-down and decommissioned installations at the CEA. This report summarizes the highlights of the 1998 year: the cleansing plan of the CEA (current policy, plan scheme, quality assurance, financing, public relation); the radioactive wastes (general considerations, management of liquid and solid effluents, management of sealed sources, modernization of equipments and new projects, relations with the Andra, studies in progress); the spent fuels (general considerations, solutions, long-term storage); the dismantling of shut-down installations (general considerations about decommissioning, dismantling actions at the CEA, main works performed, dismantling actions in progress); the management of wastes at the CEA-direction for military applications (DAM); the cleansing of the CEA-Marcoule site; 1998 status of the management of wastes (appendix). (J.S.)

  15. Waste regular management: experience and progress prospects

    International Nuclear Information System (INIS)

    Lallement, R.

    1997-01-01

    Since 1990, the CEA has devoted important financial means for the radioactive civilian waste cleaning of its centers: radioactive waste processing (and especially large stocks of ancient wastes), useless-fuel management for fuels produced by experimental reactors and laboratories, and wastes produced by ancient nuclear facilities dismantlement. A policy towards waste volume reduction had already led to a 20 pc volume reduction of its low-level wastes since 1993

  16. Achievements and prospects of robotics in dismantling operations

    International Nuclear Information System (INIS)

    Clement, G.; Goetghebeur, S.; Ravera, J.P.

    1993-01-01

    After a definition of 'robotic systems' (poly functionality is the main concept), the nuclear facilities that have used robotic systems for their dismantling are reviewed; the various robot intervention domains in dismantling, the different types of machines and the work carried out by robots are presented. Difficulties arising from robot utilization for reactor dismantling, robot design considerations, reliability, personnel training needs, tooling and costs are discussed. Applicability criteria are derived concerning radio protection, hard working conditions, task complexity, multiplicity and quality, and costs

  17. Hair mercury concentrations and associated factors in an electronic waste recycling area, Guiyu, China

    Energy Technology Data Exchange (ETDEWEB)

    Ni, Wenqing [Department of Preventive Medicine, Shantou University Medical College, Shantou 515041, Guangdong (China); Chen, Yaowen [Central Laboratory of Shantou University, Shantou 515063, Guangdong (China); Huang, Yue; Wang, Xiaoling [Department of Preventive Medicine, Shantou University Medical College, Shantou 515041, Guangdong (China); Zhang, Gairong [Central Laboratory of Shantou University, Shantou 515063, Guangdong (China); Luo, Jiayi [Department of Preventive Medicine, Shantou University Medical College, Shantou 515041, Guangdong (China); Wu, Kusheng, E-mail: kswu@stu.edu.cn [Department of Preventive Medicine, Shantou University Medical College, Shantou 515041, Guangdong (China)

    2014-01-15

    Objective: Toxic heavy metals are released to the environment constantly from unregulated electronic waste (e-waste) recycling in Guiyu, China, and thus may contribute to the elevation of mercury (Hg) and other heavy metals levels in human hair. We aimed to investigate concentrations of mercury in hair from Guiyu and potential risk factors and compared them with those from a control area where no e-waste processing occurs. Methods: A total of 285 human hair samples were collected from three villages (including Beilin, Xianma, and Huamei) of Guiyu (n=205) and the control area, Jinping district of Shantou city (n=80). All the volunteers were administered a questionnaire regarding socio-demographic characteristics and other possible factors contributed to hair mercury concentration. Hair mercury concentration was analyzed by hydride generation atomic fluorescence spectrometry (AFS). Results: Our results suggested that hair mercury concentrations in volunteers of Guiyu (median, 0.99; range, 0.18–3.98 μg/g) were significantly higher than those of Jinping (median, 0.59; range, 0.12–1.63 μg/g). We also observed a higher over-limit ratio (>1 μg/g according to USEPA) in Guiyu than in Jinping (48.29% vs. 11.25%, P<0.001). Logistic regression model showed that the variables of living house also served as an e-waste workshop, work related to e-waste, family income, time of residence in Guiyu, the distance between home and waste incineration, and fish intake were associated with hair mercury concentration. After multiple stepwise regression analysis, in the Guiyu samples, hair mercury concentration was found positively associated with the time residence in Guiyu (β=0.299, P<0.001), and frequency of shellfish intake (β=0.184, P=0.016); and negatively associated with the distance between home and waste incineration (β=−0.190, P=0.015) and whether house also served as e-waste workshop (β=−0.278, P=0.001). Conclusions: This study investigated human mercury exposure

  18. Hair mercury concentrations and associated factors in an electronic waste recycling area, Guiyu, China

    International Nuclear Information System (INIS)

    Ni, Wenqing; Chen, Yaowen; Huang, Yue; Wang, Xiaoling; Zhang, Gairong; Luo, Jiayi; Wu, Kusheng

    2014-01-01

    Objective: Toxic heavy metals are released to the environment constantly from unregulated electronic waste (e-waste) recycling in Guiyu, China, and thus may contribute to the elevation of mercury (Hg) and other heavy metals levels in human hair. We aimed to investigate concentrations of mercury in hair from Guiyu and potential risk factors and compared them with those from a control area where no e-waste processing occurs. Methods: A total of 285 human hair samples were collected from three villages (including Beilin, Xianma, and Huamei) of Guiyu (n=205) and the control area, Jinping district of Shantou city (n=80). All the volunteers were administered a questionnaire regarding socio-demographic characteristics and other possible factors contributed to hair mercury concentration. Hair mercury concentration was analyzed by hydride generation atomic fluorescence spectrometry (AFS). Results: Our results suggested that hair mercury concentrations in volunteers of Guiyu (median, 0.99; range, 0.18–3.98 μg/g) were significantly higher than those of Jinping (median, 0.59; range, 0.12–1.63 μg/g). We also observed a higher over-limit ratio (>1 μg/g according to USEPA) in Guiyu than in Jinping (48.29% vs. 11.25%, P<0.001). Logistic regression model showed that the variables of living house also served as an e-waste workshop, work related to e-waste, family income, time of residence in Guiyu, the distance between home and waste incineration, and fish intake were associated with hair mercury concentration. After multiple stepwise regression analysis, in the Guiyu samples, hair mercury concentration was found positively associated with the time residence in Guiyu (β=0.299, P<0.001), and frequency of shellfish intake (β=0.184, P=0.016); and negatively associated with the distance between home and waste incineration (β=−0.190, P=0.015) and whether house also served as e-waste workshop (β=−0.278, P=0.001). Conclusions: This study investigated human mercury exposure

  19. OPTIMASI PEMILIHAN LOKASI FASILITAS PENGOLAHAN LIMBAH ELEKTRONIK (E-WASTE DI INDONESIA DENGAN MODEL ELECTRE III

    Directory of Open Access Journals (Sweden)

    Pertiwi Andarani

    2015-01-01

    Full Text Available Limbah elektronik adalah masalah yang muncul di Indonesia karena mengandung bahan yang berpotensi berbahaya. Dalam rangka menciptakan manajemen yang ramah lingkungan dari limbah elektronik, fasilitas yang memadai diperlukan. Tujuan dari penelitian ini adalah untuk memilih lokasi yang optimal untuk mengembangkan fasilitas pengolahan limbah elektronik (FLPE. Pemilihan lokasi yang optimal dilakukan dengan menggunakan metode model ELECTRE III. ELECTRE adalah keluarga metode analisis keputusan multi-kriteria yang berasal di Eropa. Kriteria yang dipilih untuk analisis ini adalah penduduk setempat, penduduk yang dilayani, persentase belanja bulanan, harga rata-rata rumah tangga per unit, populasi pengangguran, status finansial dari penduduk lokal, jarak dari fasilitas yang telah ada, dan jarak dari pelabuhan terdekat. ELECTRE III membutuhkan penentuan tiga ambang batas, yaitu ambang kelalaian (q, ambang batas preferensi (p, dan ambang veto (v dalam upaya untuk lebih beradaptasi dengan ketidakpastian. Bobot masing-masing kriteria yang ditentukan sesuai dengan kepentingan relatif terhadap kriteria lain. Lokasi optimal untuk FPLE adalah Provinsi Banten berdasarkan model ELECTRE III.   Kata Kunci: limbah elektronik, fasilitas, optimasi, ELECTRE Abstract E-waste is an emerging issue in Indonesia due to its potentially hazardous content and some precious metal. In order to create an environmentally sound management of e-waste, a facility is necessary. The objectives of this study are to to select the optimal location of e-waste dismantling and sorting facility (DSF/FLPE.  The optimal location selection was conducted using the method of ELECTRE III model. ELECTRE is a family of multi-criteria decision analysis methods that originated in Europe. The criteria chosen for this analysis are local population, population served, the percentage of monthly expenditure, average household price per unit, unemployed population, financial status of the local population

  20. Towards a more professional demolition and dismantling industry

    International Nuclear Information System (INIS)

    1988-01-01

    The work of the National Economic Development Office Demolition and Dismantling Group in four areas which are crucial to the economic performance of the demolition and dismantling industry and its safety record is considered. The first concerns the availability and accessibility of information about unconventional structures and details are given of the sort of information often kept for different types of structure. Secondly, the need is stressed for guidelines for the client, particularly on the risks involved and the choice of a competent contractor. Thirdly, basic credentials which it is important for contractors to set out in order to establish a good reputation for the industry are set out. Finally, the particular case of nuclear power station decommissioning is considered with reference to the size of the market, the pioneering knowledge to be gained from the decommissioning of the Windscale Advanced Gas-cooled Reactor, private sector involvement and the special techniques required. (U.K.)

  1. Enhanced phytoremediation potential of polychlorinated biphenyl contaminated soil from e-waste recycling area in the presence of randomly methylated-β-cyclodextrins

    International Nuclear Information System (INIS)

    Shen Chaofeng; Tang Xianjin; Cheema, Sardar Alam; Zhang Congkai; Khan, Muhammad Imran; Liang Fang; Chen Xincai; Zhu Youfeng; Lin Qi; Chen, Yingxu

    2009-01-01

    The crude recycling of electronic and electric waste (e-waste) is now creating soil pollution problems with organic compounds such as polychlorinated biphenyls (PCBs). The present study aimed to compare the phytoremediation potential of four plant species (rice, alfalfa, ryegrass and tall fescue) for PCBs contaminated soil from Taizhou city, one of the largest e-waste recycling centers in China. In addition, the enhanced effects of randomly methylated-β-cyclodextrins (RAMEB) on PCBs phytoremediation potential were evaluated. Higher PCBs removal percentages of 25.6-28.5% in rhizosphere soil were observed after 120 days, compared with those of the non-rhizosphere (10.4-16.9%) and unplanted controls (7.3%). The average PCBs removal percentages of four plant species increased from 26.9% to 37.1% in the rhizosphere soil with addition of RAMEB. Meanwhile, relatively high microbial counts and dehydrogenase activity were detected in planted soils and a stimulatory effect by RAMEB addition was found. The present study indicated that all the plant candidates were feasible for phytoremediation of PCBs contaminated soil from the e-waste recycling area, and tall fescue with RAMEB amendment seemed as a promising remediation strategy. High PCBs removal percentage was due to the increased PCBs bioavailability as well as biostimulation of microbial communities after plantation and RAMEB addition.

  2. Enhanced phytoremediation potential of polychlorinated biphenyl contaminated soil from e-waste recycling area in the presence of randomly methylated-{beta}-cyclodextrins

    Energy Technology Data Exchange (ETDEWEB)

    Shen Chaofeng [Institute of Environmental Science and Technology, Zhejiang University, Hangzhou 310029 (China); MOE Key Lab of Environmental Remediation and Ecosystem Health, College of Environmental and Resources Science, Zhejiang University, Hangzhou 310029 (China); Tang Xianjin; Cheema, Sardar Alam; Zhang Congkai; Khan, Muhammad Imran; Liang Fang; Chen Xincai; Zhu Youfeng [Institute of Environmental Science and Technology, Zhejiang University, Hangzhou 310029 (China); Lin Qi, E-mail: linqi@zju.edu.cn [Institute of Environmental Science and Technology, Zhejiang University, Hangzhou 310029 (China); Chen, Yingxu [Institute of Environmental Science and Technology, Zhejiang University, Hangzhou 310029 (China)

    2009-12-30

    The crude recycling of electronic and electric waste (e-waste) is now creating soil pollution problems with organic compounds such as polychlorinated biphenyls (PCBs). The present study aimed to compare the phytoremediation potential of four plant species (rice, alfalfa, ryegrass and tall fescue) for PCBs contaminated soil from Taizhou city, one of the largest e-waste recycling centers in China. In addition, the enhanced effects of randomly methylated-{beta}-cyclodextrins (RAMEB) on PCBs phytoremediation potential were evaluated. Higher PCBs removal percentages of 25.6-28.5% in rhizosphere soil were observed after 120 days, compared with those of the non-rhizosphere (10.4-16.9%) and unplanted controls (7.3%). The average PCBs removal percentages of four plant species increased from 26.9% to 37.1% in the rhizosphere soil with addition of RAMEB. Meanwhile, relatively high microbial counts and dehydrogenase activity were detected in planted soils and a stimulatory effect by RAMEB addition was found. The present study indicated that all the plant candidates were feasible for phytoremediation of PCBs contaminated soil from the e-waste recycling area, and tall fescue with RAMEB amendment seemed as a promising remediation strategy. High PCBs removal percentage was due to the increased PCBs bioavailability as well as biostimulation of microbial communities after plantation and RAMEB addition.

  3. Information report published in application of article 146 of the Regulation by the Commission of information related to the technical and financial feasibility of the dismantling of basic nuclear installations on the behalf of the Commission for sustainable development and land planning. Nr 4428

    International Nuclear Information System (INIS)

    Aubert, Julien; Romagnan, Barbara

    2017-01-01

    Based on visits, on hearings and on debates within the Commission, this report addresses the issue of the technical and financial feasibility of the dismantling of nuclear installations. Indeed, it appears that the technical feasibility is not as mastered as supposed, and that dismantling works will last longer than foreseen, with therefore a higher cost than foreseen. Thus, existing and foreseen funding might be insufficient, and the global strategy for dismantling should be seriously reviewed regarding both technical and financial points of view. Before reaching this conclusion, the report presents the general context: definition of dismantling, perspective of development of dismantling activities, specific case of marine reactors. The authors then present and comment initial basic principles (extrapolation with the Dampierre model, immediate dismantling, soil decontamination) and parameters which could result in cost reduction. The second part of the report discusses the technical issue, first by recalling and commenting the difficulties faced by EDF to dismantle its first reactors (case of Brennilis, complete shift by EDF regarding its strategy for graphite-gas reactors, case of Superphenix), secondly by outlining that waste management largely determines dismantling (situation for the different types of wastes, problem of saturation of some centres, issue of a release threshold, case of wastes from graphite-gas reactors), and thirdly by discussing the issue of subcontracting. The third part addresses the financial issue and EDF funding by discussing assessment principles and method used by EDF, by showing that the result is probably an under-assessment (due to optimistic hypotheses, to many unfunded expenses, and to under-assessed dismantling costs). The authors then compare the French situation with other countries (Germany, USA, Belgium, OECD countries) to show that institutional comparisons are consistent with each other. They propose a more detailed

  4. Encapsulation of tritiated wastes in hot laboratories

    International Nuclear Information System (INIS)

    Hayet, L.; Bourdinaud, P.

    1982-06-01

    From 1962 to 1976, one of the laboratories called ''Cellule 4'', was equipped to produce large quantities of tritium. The decisions taken in June 1976 to redirect the activities of the Radioisotopes Department included the suspension of the tritium activities of ''Cellule 4'' at the Saclay Nuclear Research Center. From 1976 to 1981, many CEA departments contributed to the design and implementation of a packaging procedure for tritiated wastes resulting from the dismantling of ''Cellule 4''. A classification into three groups was adopted for this purpose. (1) Packaging in a welded stainless steel container. (2) Packaging in a reinforced concrete shell lined internally with a thick coat of epoxy resin charged with sand. (3) Packaging in a reinforced concrete shell lined internally with a thin coat of epoxy resin. The dismantling operations were carried out in three phases. (1) (2 1/2 months): the T activity remained unchanged during this period and waste selection was carried out. (2) (2 1/2 months): waste dismantling and packaging of groups (2) and (3) were carried out in this phase. Activity decayed rapidly. (3) (2 months): the work performed included the loosening and cutting of the general structures [fr

  5. Direction in charge of the management of wastes. 1998 activity report; Direction chargee de la gestion des dechets. Rapport d'activite 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-07-01

    This document is the 1998 activity report of the direction in charge of the management of radioactive wastes (DGD) of the French atomic energy commission (CEA). The role of the DGD is the elimination of radioactive wastes, the management of spent fuels, the cleansing and dismantling of shut-down and decommissioned installations at the CEA. This report summarizes the highlights of the 1998 year: the cleansing plan of the CEA (current policy, plan scheme, quality assurance, financing, public relation); the radioactive wastes (general considerations, management of liquid and solid effluents, management of sealed sources, modernization of equipments and new projects, relations with the Andra, studies in progress); the spent fuels (general considerations, solutions, long-term storage); the dismantling of shut-down installations (general considerations about decommissioning, dismantling actions at the CEA, main works performed, dismantling actions in progress); the management of wastes at the CEA-direction for military applications (DAM); the cleansing of the CEA-Marcoule site; 1998 status of the management of wastes (appendix). (J.S.)

  6. Decontamination and remote dismantling tests in the Itrec reprocessing plant

    International Nuclear Information System (INIS)

    Candelieri, T.; Gerardi, A.; Soffietto, G.

    1993-01-01

    The scope of this research is to evaluate the advantages of the rack removal system in the dismantling of reprocessing installations. The objective of this work is to verify experimentally the possibility of the decontamination of any particular module and the capability of the remote dismantling of components installed in the mobile rack. In particular, the main objective is to develop remotely operated equipment for the dismantling of centrifugal contactors. The decontamination of the equipment which represents the most important preliminary phase of the decommissioning operation, allowed to obtain low-level radioactivity. A supporting programme has been performed in order to collect sufficient data for the project and design of the remote dismantling machine. On the basis of technological cold test results, the project of the dismantling machine's construction has been optimized. Positive results obtained during the hot dismantling operations on the Rack 6 bis attested the effectiveness of the rack removal system as an original design which facilitates decommissioning of reprocessing plants. 2 tabs., 18 figs

  7. ITER waste management

    International Nuclear Information System (INIS)

    Rosanvallon, S.; Na, B.C.; Benchikhoune, M.; Uzan, J. Elbez; Gastaldi, O.; Taylor, N.; Rodriguez, L.

    2010-01-01

    ITER will produce solid radioactive waste during its operation (arising from the replacement of components and from process and housekeeping waste) and during decommissioning (de-activation phase and dismantling). The waste will be activated by neutrons of energies up to 14 MeV and potentially contaminated by activated corrosion products, activated dust and tritium. This paper describes the waste origin, the waste classification as a function of the French national agency for radioactive waste management (ANDRA), the optimization process put in place to reduce the waste radiotoxicity and volumes, the estimated waste amount based on the current design and maintenance procedure, and the overall strategy from component removal to final disposal anticipated at this stage of the project.

  8. Dismantling of the reactor block of the FRJ-1 research reactor (MERLIN); Abbau des Reaktorblocks des Forschungsreaktors FRJ-1 (MERLIN)

    Energy Technology Data Exchange (ETDEWEB)

    Stahn, B.; Matela, K.; Zehbe, C. [Forschungszentrum Juelich GmbH (Germany); Poeppinghaus, J. [Gesellschaft fuer Nuklear-Service mbH, Essen (Germany); Cremer, J. [Siempelkamp Nukleartechnik GmbH, Heidelberg (Germany)

    2003-07-01

    By the end of 1998 the complete secondary cooling system and the major part of the primary cooling system were dismantled. Furthermore, the experimental devices, including a rabbit system conceived as an in-core irradiation device, were disassembled and disposed of. In total, approx. 65 t of contaminated and/or activated material as well as approx. 70 t of clearance-measured material were disposed of within the framework of these activities. The dismantling of the coolant loops and experimental devices was followed in 2000 by the removal of the reactor tank internals and the subsequent draining of the reactor tank water. The reactor tank internals were essentially the core support plate, the core box, the flow channel and the neutron flux bridges (s. Fig. 2, detailed reactor core). All components consisted of aluminium, the connecting elements such as bolts and nuts, however, of stainless steel. Due to the high activation of the core internals, disassembly had to be remotely controlled under water. All removal work was carried out from a tank intermediate floor (s. Fig. 2). These activities, which served for preparing the dismantling of the reactor block, were completed in summer 2001. The waste parts arising were transferred to the Service Department for Decontamination of the Research Centre. This included approx. 2.5 t of waste parts with a total activity of approx. 8 x 10{sup 11} Bq. (orig.)

  9. Composite analysis E-area vaults and saltstone disposal facilities

    Energy Technology Data Exchange (ETDEWEB)

    Cook, J.R.

    1997-09-01

    This report documents the Composite Analysis (CA) performed on the two active Savannah River Site (SRS) low-level radioactive waste (LLW) disposal facilities. The facilities are the Z-Area Saltstone Disposal Facility and the E-Area Vaults (EAV) Disposal Facility. The analysis calculated potential releases to the environment from all sources of residual radioactive material expected to remain in the General Separations Area (GSA). The GSA is the central part of SRS and contains all of the waste disposal facilities, chemical separations facilities and associated high-level waste storage facilities as well as numerous other sources of radioactive material. The analysis considered 114 potential sources of radioactive material containing 115 radionuclides. The results of the CA clearly indicate that continued disposal of low-level waste in the saltstone and EAV facilities, consistent with their respective radiological performance assessments, will have no adverse impact on future members of the public.

  10. Composite analysis E-area vaults and saltstone disposal facilities

    International Nuclear Information System (INIS)

    Cook, J.R.

    1997-09-01

    This report documents the Composite Analysis (CA) performed on the two active Savannah River Site (SRS) low-level radioactive waste (LLW) disposal facilities. The facilities are the Z-Area Saltstone Disposal Facility and the E-Area Vaults (EAV) Disposal Facility. The analysis calculated potential releases to the environment from all sources of residual radioactive material expected to remain in the General Separations Area (GSA). The GSA is the central part of SRS and contains all of the waste disposal facilities, chemical separations facilities and associated high-level waste storage facilities as well as numerous other sources of radioactive material. The analysis considered 114 potential sources of radioactive material containing 115 radionuclides. The results of the CA clearly indicate that continued disposal of low-level waste in the saltstone and EAV facilities, consistent with their respective radiological performance assessments, will have no adverse impact on future members of the public

  11. Heavy metals in PM_2_._5 and in blood, and children's respiratory symptoms and asthma from an e-waste recycling area

    International Nuclear Information System (INIS)

    Zeng, Xiang; Xu, Xijin; Zheng, Xiangbin; Reponen, Tiina; Chen, Aimin; Huo, Xia

    2016-01-01

    This study was to investigate the levels of heavy metals in PM_2_._5 and in blood, the prevalence of respiratory symptoms and asthma, and the related factors to them. Lead and cadmium in both PM_2_._5 and blood were significant higher in Guiyu (exposed area) than Haojiang (reference area) (p  5 μg/dL was significantly associated with asthma (OR, 9.50; 95% CI, 1.16–77.49). Higher blood chromium and blood manganese were associated with more cough and wheeze, respectively. Our data suggest that living in e-waste exposed area may lead to increased levels of heavy metals, and accelerated prevalence of respiratory symptoms and asthma. - Highlights: • Higher levels of Pb and Cd pollution are found in PM_2_._5 and in blood from Guiyu. • Higher prevalence of respiratory symptoms is observed in children from Guiyu. • Living in Guiyu is associated with increased levels of Pb and Cd. • Living in Guiyu may lead to elevated prevalence of respiratory symptoms. • High prevalence of cough and phlegm in Guiyu comes from contacting with e-waste. - Heavy metal levels in PM_2_._5 and in blood, and the association between living area and heavy metals, respiratory symptoms and asthma.

  12. Prefiltration of gaseous effluents in plant dismantling

    International Nuclear Information System (INIS)

    Pilot, G.; Pourprix, M.

    1991-01-01

    The dismantling techniques and mainly the thermal cutting tools can create large amounts of airbone dust, possibly contaminated in the case of the cutting of radioactive materials. Among the secondary solid emissions, the aerosols constitute the most mobile part which can disseminate contamination in the cell where the cutting operation takes place and in the ventilation ducts up to the HEPA filters. An optimised prefiltration coupled with a captation device at the aerosol generating source allows to avoid the dissemination of the contamination, to increase the life of HEPA filters and thus to reduce the amount of solid wastes. The object in this work was to select one or several cleaning devices, selection that can be done from the knowledge of the physico-chemical characteristics of the gas and aerosols to deal with, the available cleaning devices and the implied facility

  13. Nevada Test Site, 2006 Waste Management Monitoring Report, Area 3 and Area 5 Radioactive Waste Management Sites

    International Nuclear Information System (INIS)

    David B. Hudson

    2007-01-01

    Environmental monitoring data were collected at and around the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) at the Nevada Test Site. These data are associated with radiation exposure, air, groundwater, meteorology, vadose zone, subsidence, and biota. This report summarizes the 2006 environmental data to provide an overall evaluation of RWMS performance and to support environmental compliance and performance assessment (PA) activities. Some of these data (e.g., radiation exposure, air, and groundwater) are presented in other reports (U.S. Department of Energy, 2006; Warren and Grossman, 2007; National Security Technologies, LLC, 2007). Direct radiation monitoring data indicate that exposure levels around the RWMSs are at or below background levels. Air monitoring data at the Area 3 and Area 5 RWMSs indicate that tritium concentrations are slightly above background levels. There is no detectable man-made radioactivity by gamma spectroscopy, and concentrations of americium and plutonium are only slightly above detection limits at the Area 3 RWMS. Measurements at the Area 5 RWMS show that radon flux from waste covers is no higher than natural radon flux from undisturbed soil in Area 5. Groundwater monitoring data indicate that the groundwater in the uppermost aquifer beneath the Area 5 RWMS is not impacted by facility operations. Precipitation during 2006 totaled 98.6 millimeters (mm) (3.9 inches [in.]) at the Area 3 RWMS and 80.7 mm (3.2 in.) at the Area 5 RWMS. Soil-gas tritium monitoring continues to show slow subsurface migration consistent with previous results. Moisture from precipitation at Area 5 remains at the bottom of the bare-soil weighing lysimeter, but this same moisture has been removed from the vegetated weighing lysimeter by evapotranspiration. Vadose zone data from the operational waste pit covers show that evaporation continues to slowly remove soil moisture that came from the heavy precipitation in the fall of 2004 and the spring of

  14. Using SAFRAN Software to Assess Radiological Hazards from Dismantling of Tammuz-2 Reactor Core at Al-tuwaitha Nuclear Site

    Science.gov (United States)

    Abed Gatea, Mezher; Ahmed, Anwar A.; jundee kadhum, Saad; Ali, Hasan Mohammed; Hussein Muheisn, Abbas

    2018-05-01

    The Safety Assessment Framework (SAFRAN) software has implemented here for radiological safety analysis; to verify that the dose acceptance criteria and safety goals are met with a high degree of confidence for dismantling of Tammuz-2 reactor core at Al-tuwaitha nuclear site. The activities characterizing, dismantling and packaging were practiced to manage the generated radioactive waste. Dose to the worker was considered an endpoint-scenario while dose to the public has neglected due to that Tammuz-2 facility is located in a restricted zone and 30m berm surrounded Al-tuwaitha site. Safety assessment for dismantling worker endpoint-scenario based on maximum external dose at component position level in the reactor pool and internal dose via airborne activity while, for characterizing and packaging worker endpoints scenarios have been done via external dose only because no evidence for airborne radioactivity hazards outside the reactor pool. The in-situ measurements approved that reactor core components are radiologically activated by Co-60 radioisotope. SAFRAN results showed that the maximum received dose for workers are (1.85, 0.64 and 1.3mSv/y) for activities dismantling, characterizing and packaging of reactor core components respectively. Hence, the radiological hazards remain below the low level hazard and within the acceptable annual dose for workers in radiation field

  15. Nuclear and non-nuclear safety aspects in nuclear facilities dismantling. The example of a PWR pilot decommissioning project

    International Nuclear Information System (INIS)

    Massaut, V.; Deboodt, P.; Dadoumont, J.; Valenduc, P.; Denissen, L.

    2002-01-01

    The dismantling of nuclear facilities, and in particular of nuclear power plants, involves new challenges for the nuclear industry. Although the dismantling of various activated and contaminated components is nowadays considered as almost industrial practice, the safety aspects of decommissioning bring some specific features which are not always taken into account in the operation of the plants. Moreover, most of the plants and facilities currently decommissioned are rather old and were never foreseen to be decommissioned. The operations involved in dismantling and decontamination, often imply new or unforeseen situations. On the nuclear, or radiological side, the radioprotection optimisation of the operations involved often requires to model the environment and to analyse different scenarios to tackle the operation. Recent 3-D software (like the Visiplan software) allowing representation of the actual environment and the influence of the various sources present, is really needed to be able to minimise the radiological impact on the operators. The risk of contamination spread, by opening loops and components or by the dismantling process itself, is also an important aspect of the radiological protection study. Nevertheless, the radiological aspects of the safety approach are not the only ones to be dealt with when decommissioning nuclear facilities. Indeed, classical industrial safety aspects are also important: the dismantling can bring handling and transporting risk (heavy loads, difficult ways, uneasy access, etc.) but also the handling of toxic or hazardous materials. For instance, the removal of asbestos in contaminated areas can lead to additional hazard; the presence of alkali metals (like Na or NaK), of toxic metals (like e.g. Beryllium) or of corrosive fluids (acid,...) have to be tackled often in unstructured environment, and sometimes with limited knowledge of the actual situation. This leads to approach the operations following the ASARA principle (As

  16. Air Pathway Dose Modeling for the E-Area Low-Level Waste Facility

    Energy Technology Data Exchange (ETDEWEB)

    Dixon, K. L. [Savannah River Site (SRS), Aiken, SC (United States); Minter, K. M. [Savannah River Site (SRS), Aiken, SC (United States)

    2017-09-06

    Dose-release factors (DRFs) were calculated for potential atmospheric releases of several radionuclides from the E-Area Low-Level Waste Facility (ELLWF). The ELLWF receives solid low-level radioactive waste from across the Savannah River Site (SRS) and offsite for disposal. These factors represent the maximum dose a receptor would receive if standing at either 100 m or 11,410 m (Site Boundary) from the edge of an ELLWF disposal unit which are points of assessment (POA) for Department of Energy (DOE) Order 435.1 performance assessments (PA). The DRFs were calculated for 1 Ci of the specified radionuclide being released from the ground surface to the atmosphere (mrem per curie released). The calculation conservatively represented the ELLWF as a point source, and conservatively assumed the receptor was positioned at the center of the contaminant plume and continuously exposed for a period of one year. These DRFs can be refined to take into consideration disposal unit size, proximity and timing of peak dose to establish less conservative radionuclide specific disposal limits. DRFs were calculated for H-3 and C-14 in Revision 0 of this report. H-3 as HTO and C-14 as CO2 were identified as volatile radionuclides of potential concern in earlier radionuclide screening studies. In Revision 1, DRFs were calculated for eight additional radionuclides identified by an updated screening analysis as potentially important volatile radionuclides. These include Ar-37, Ar-39, Ar-42, Hg-194, Hg- 203, Kr-81, Kr-85, and Xe-127.

  17. Polybrominated diphenyl ethers in soils, sediments, and human hair in a plastic waste recycling area: a neglected heavily polluted area.

    Science.gov (United States)

    Tang, Zhenwu; Huang, Qifei; Cheng, Jiali; Yang, Yufei; Yang, Jun; Guo, Wei; Nie, Zhiqiang; Zeng, Ning; Jin, Lu

    2014-01-01

    The release of pollutants during the recycling of contaminated plastics is a problem which has drawn worldwide attention; however, little information on the transfer of polybrominated diphenyl ethers (PBDEs) in these processes is available. We conducted a survey of PBDEs in soils, sediments, and human hair in a typical plastic waste recycling area in northern China. The total concentrations (ng/g) of 21 PBDEs were 1.25-5504 (average 600), 18.2-9889 (average 1619), and 1.50-861 (average 112) in soils, sediments, and hair, respectively. The PBDE concentrations were comparable to concentrations observed in e-waste recycling areas; however, the concentrations in soils and sediments were 1-3 orders of magnitude higher than in other areas, and the concentrations in hair were much higher than in other areas. This indicates that this area is highly polluted with PBDEs. BDE-209 was the dominant congener (representing 91.23%, 92.3%, and 91.5% of the total PBDEs observed in soils, sediments, and hair, respectively), indicating that the commercial deca-BDE product was dominant. The commercial penta- and octa-BDE products made small contributions to the total PBDE concentrations, unlike what has been found in some e-waste recycling areas. Our results show that crude plastic waste processing is a major contributor of PBDEs to the environment and humans, which should be of great concern.

  18. Simulation for preparation of dismantling operations

    International Nuclear Information System (INIS)

    Carrere, J.M.; Idasiak, J.M.

    2003-01-01

    New applications of 3D models are still emerging. At first, simulation of dismantling operations has been used to illustrate the proposed scenarios, with 3D views or animated films, for: - internal and external communication; - technical reviews; - presentation to Safety Authorities. It helps a lot to explain the structure of the facility to dismantle, the proposed solutions, to convince people that the study is detailed enough. But 3D modelling is an investment in time and money. A lot of time is spent in collecting the drawings, and checking them with pictures, videos, interviews of operators, new measurements. This investment can be much more exploited, during all the life time of the decommissioning project, to avoid problems during operations, and so to save a lot of money. It is possible to have navigation or even immersion inside 3D models of facilities to dismantle, so that the project team or the operators can be familiar with the configuration of rooms, of accesses, with the location of equipment. A 3D model can hardly be as detailed as the real facility. Some simplifications have to be done, to avoid having too heavy models. But in a training process, 3D-models help to have rapidly an overview of complex environments. Dose uptake simulation is becoming also a tool for decommissioning projects. It is possible to compute either off line, or even in real time, the dose uptake of the operators, and to compare easily different options for the ALARA principle: decontamination or not, use of shielding or not. It requires to have not only the geometrical model, but also a radiological model of the facility, but with the use of gamma camera and spectrometry, it becomes easier. 3D-models can be used to integrate in an user-friendly way all the knowledge of a facility to decommission, and to update that knowledge during operations: reports on construction, on exploitation, on shut-down, physical and radiological measurements, traceability of wastes. Progress are

  19. Waste site grouping for 200 Areas soil investigations

    International Nuclear Information System (INIS)

    1997-01-01

    The purpose of this document is to identify logical waste site groups for characterization based on criteria established in the 200 Areas Soil Remediation Strategy (DOE-RL 1996a). Specific objectives of the document include the following: finalize waste site groups based on the approach and preliminary groupings identified in the 200 Areas Soil Remediation Strategy; prioritize the waste site groups based on criteria developed in the 200 Areas Soil Remediation Strategy; select representative site(s) that best represents typical and worse-case conditions for each waste group; develop conceptual models for each waste group. This document will serve as a technical baseline for implementing the 200 Areas Soil Remediation Strategy. The intent of the document is to provide a framework, based on waste site groups, for organizing soil characterization efforts in the 200 Areas and to present initial conceptual models

  20. The Molten Salt Reactor option for beneficial use of fissile material from dismantled weapons

    International Nuclear Information System (INIS)

    Gat, U.; Engel, J.R.; Dodds, H.L.

    1991-01-01

    The Molten Salt Reactor (MSR) option for burning fissile fuel from dismantled weapons is examined. It is concluded that MSRs are very suitable for beneficial utilization of the dismantled fuel. The MSRs can utilize any fissile fuel in continuous operation with no special modifications, as demonstrated in the Molten Salt Reactor Experiment. Thus MSRs are flexible while maintaining their economy. MSRs further require a minimum of special fuel preparation and can tolerate denaturing and dilution of the fuel. Fuel shipments can be arbitrarily small, all of which supports nonproliferation and averts diversion. MSRs have inherent safety features which make them acceptable and attractive. They can burn a fuel type completely and convert it to other fuels. MSRs also have the potential for burning the actinides and delivering the waste in an optimal form, thus contributing to the solution of one of the major remaining problems for deployment of nuclear power. 19 refs

  1. A Software for soil quality conservation at organic waste disposal areas: The case of olive mill and pistachio wastes.

    Science.gov (United States)

    Doula, Maria; Sarris, Apostolos; Papadopoulos, Nikos; Hliaoutakis, Aggelos; Kydonakis, Aris; Argyriou, Lemonia; Theocharopoulos, Sid; Kolovos, Chronis

    2016-04-01

    For the sustainable reuse of organic wastes at agricultural areas, apart from extensive evaluation of waste properties and characteristics, it is of significant importance, in order to protect soil quality, to evaluate land suitability and estimate the correct application doses prior waste landspreading. In the light of this precondition, a software was developed that integrates GIS maps of land suitability for waste reuse (wastewater and solid waste) and an algorithm for waste doses estimation in relation to soil analysis, and in case of reuse for fertilization with soil analysis, irrigation water quality and plant needs. EU and legislation frameworks of European Member States are also considered for the assessment of waste suitability for landspreading and for the estimation of the correct doses that will not cause adverse effects on soil and also to underground water (e.g. Nitrate Directive). Two examples of software functionality are presented in this study using data collected during two LIFE projects, i.e. Prosodol for landspreading of olive mill wastes and AgroStrat for pistachio wastes.

  2. Nevada Test Site 2009 Waste Management Monitoring Report Area 3 and Area 5 Radioactive Waste Management Sites

    International Nuclear Information System (INIS)

    2010-01-01

    Environmental monitoring data were collected at and around the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) at the Nevada Test Site (NTS). These data are associated with radiation exposure, air, groundwater, meteorology, vadose zone, subsidence, and biota. This report summarizes the 2009 environmental data to provide an overall evaluation of RWMS performance and to support environmental compliance and performance assessment (PA) activities. Some of these data (e.g., radiation exposure, air, and groundwater) are presented in other reports. Direct radiation monitoring data indicate exposure levels at the RWMSs are within the range of background levels measured at the NTS. Air monitoring data at the Area 3 and Area 5 RWMSs indicate that tritium concentrations are slightly above background levels. All gamma spectroscopy results for air particulates collected at the Area 3 and Area 5 RWMS were below the minimum detectable concentrations, and concentrations of americium and plutonium are only slightly above detection limits. The measured levels of radionuclides in air particulates and moisture are below derived concentration guides for these radionuclides. Radon flux from waste covers is well below regulatory limits. Groundwater monitoring data indicate that the groundwater in the uppermost aquifer beneath the Area 5 RWMS is not impacted by facility operations. The 87.6 millimeters (mm) (3.45 inches (in.)) of precipitation at the Area 3 RWMS during 2009 is 43 percent below the average of 152.4 mm (6.00 in.), and the 62.7 mm (2.47 in.) of precipitation at the Area 5 RWMS during 2009 is 49 percent below the average of 122.5 mm (4.82 in.). Soil-gas tritium monitoring at borehole GCD-05 continues to show slow subsurface migration consistent with previous results. Water balance measurements indicate that evapotranspiration from the vegetated weighing lysimeter dries the soil and prevents downward percolation of precipitation more effectively than evaporation

  3. Special Analysis for the Disposal of the INL Waste Associated with the Unirradiated Light Water Breeder Reactor (LWBR) Waste Stream at the Area 5 Radioactive Waste Management Site

    Energy Technology Data Exchange (ETDEWEB)

    Shott, Gregory [National Security Technologies, LLC, Las Vegas, NV (United States)

    2017-03-21

    This special analysis (SA) evaluates whether the Idaho National Laboratory (INL) Waste Associated with the Unirradiated Light Water Breeder Reactor (LWBR) waste stream (INEL167203QR1, Revision 0) is suitable for shallow land burial (SLB) at the Area 5 Radioactive Waste Management Site (RWMS) on the Nevada National Security Site (NNSS). Disposal of the INL Waste Associated with the Unirradiated LWBR waste meets all U.S. Department of Energy (DOE) Manual DOE M 435.1-1, “Radioactive Waste Management Manual,” Chapter IV, Section P performance objectives (DOE 1999). The INL Waste Associated with the Unirradiated LWBR waste stream is recommended for acceptance with the condition that the total uranium-233 (233U) inventory be limited to 2.7E13 Bq (7.2E2 Ci).

  4. Days of dismantling activities of installations and rehabilitation of contaminated sites in France; Demantelement des installations et rehabilitation de sites contamines

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-07-01

    The objective of these days, organized by the section environment of the French society of radiation protection, is to present a panorama of the activities of nuclear installations dismantling and contaminated sites rehabilitation in France, by leaning in the same time on practical cases and by stating the French rule and the national and international recommendations on the subject. These days have also for object to approach the stakes associated with the sectors of waste management and the materials generated by these activities and in a more general way, the stakes to come for the different actors of the dismantling and the rehabilitation. (N.C.)

  5. Nevada Test Site 2007 Waste Management Monitoring Report Area 3 and Area 5 Radioactive Waste Management Sites

    International Nuclear Information System (INIS)

    NSTec Environmental Management

    2008-01-01

    Environmental monitoring data were collected at and around the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) at the Nevada Test Site. These data are associated with radiation exposure, air, groundwater, meteorology, vadose zone, subsidence, and biota. This report summarizes the 2007 environmental data to provide an overall evaluation of RWMS performance and to support environmental compliance and performance assessment (PA) activities. Some of these data (e.g., radiation exposure, air, and groundwater) are presented in other reports (National Security Technologies, LLC, 2007a; 2008; Warren and Grossman, 2008). Direct radiation monitoring data indicate exposure levels at the RWMSs are at background levels. Air monitoring data at the Area 3 and Area 5 RWMSs indicate that tritium concentrations are slightly above background levels. A single gamma spectroscopy measurement for cesium was slightly above the minimum detectable concentration, and concentrations of americium and plutonium are only slightly above detection limits at the Area 3 RWMS. The measured levels of radionuclides in air particulates are below derived concentration guides for these radionuclides. Radon flux from waste covers is well below regulatory limits. Groundwater monitoring data indicate that the groundwater in the uppermost aquifer beneath the Area 5 RWMS is not impacted by facility operations. The 136.8 millimeters (mm) (5.39 inches [in.]) of precipitation at the Area 3 RWMS during 2007 is 13 percent below the average of 158.1 mm (6.22 in.), and the 123.8 mm (4.87 in.) of precipitation at the Area 5 RWMS during 2007 is 6 percent below the average of 130.7 mm (5.15 in.). Soil-gas tritium monitoring at borehole GCD-05U continues to show slow subsurface migration consistent with previous results. Water balance measurements indicate that evapotranspiration from the vegetated weighing lysimeter dries the soil and prevents downward movement percolation of precipitation more effectively

  6. Waste from decommissioning of research reactors and other small nuclear facilities

    International Nuclear Information System (INIS)

    Massaut, V.

    2001-01-01

    Full text: Small nuclear facilities were often built for research or pilot purposes. It includes the research reactors of various types and various aims (physics research, nuclear research, nuclear weapons development, materials testing reactor, isotope production, pilot plant, etc.) as well as laboratories, hot cells and accelerators used for a broad spectrum of research or production purposes. These installations are characterized not only by their size (reduced footprint) but also, and even mostly, by the very diversified type of materials, products and isotopes handled within these facilities. This large variety can sometimes enhance the difficulties encountered for the dismantling of such facilities. The presence of materials like beryllium, graphite, lead, PCBs, sodium, sometimes in relatively large quantities, are also challenges to be faced by the dismantlers of such facilities, because these types of waste are either toxic or no solutions are readily available for their conditioning or long term disposal. The paper will review what is currently done in different small nuclear facilities, and what are the remaining problems and challenges for future dismantling and waste management. The question of whether Research and Development for waste handling methods and processes is needed is still pending. Even for the dismantling operation itself, important improvements can be brought in the fields of characterization, decontamination, remote handling, etc. by further developments and innovative systems. The way of funding such facilities decommissioning will be reviewed as well as the very difficult cost estimation for such facilities, often one-of-a-kind. The aspects of radioprotection optimization (ALARA principle) and classical operators safety will also be highlighted, as well as the potential solutions or improvements. In fact, small nuclear facilities encounter often, when dismantling, the same problems as the large nuclear power plants, but have in

  7. Conceptual Modeling Framework for E-Area PA HELP Infiltration Model Simulations

    Energy Technology Data Exchange (ETDEWEB)

    Dyer, J. A. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2017-11-30

    A conceptual modeling framework based on the proposed E-Area Low-Level Waste Facility (LLWF) closure cap design is presented for conducting Hydrologic Evaluation of Landfill Performance (HELP) model simulations of intact and subsided cap infiltration scenarios for the next E-Area Performance Assessment (PA).

  8. CRITICALITY CONTROL DURING THE DISMANTLING OF A URANIUM CONVERSION PLANT

    International Nuclear Information System (INIS)

    LADURELLE, Laurent; LISBONNE, Pierre

    2003-01-01

    Within the Commissariat a l'Energie Atomique, in the Cadarache Research Center in southern France, the production at the Enriched Uranium Treatment Workshops started in 1965 and ended in 1995. The dismantling is in progress and will last until 2006. The decommissioning is planned in 2007. Since the authorized enrichment in 235U was 10% in some parts of the plant, and unlimited in others, the equipment and procedures were designed for criticality control during the operating period. Despite the best previous removing of the uranium in the inner parts of the equipment, evaluation of the mass of remaining fissile material by in site gamma spectrometry measurement shows that the safety of the ''clean up'' operations requires specific criticality control procedures, this mass being higher than the safe mass. The chosen method is therefore based on the mapping of fissile material in the contaminated parts of the equipment and on the respect of particular rules set for meeting the criticality control standards through mass control. The process equipment is partitioned in separated campaign, and for each campaign the equipment dismantling is conducted with a precise traceability of the pieces, from the equipment to the drum of waste, and the best final evaluation of the mass of fissile material in the drum. The first results show that the mass of uranium found in the dismantled equipment is less than the previous evaluation, and they enable us to confirm that the criticality was safely controlled during the operations. The mass of fissile material remaining in the equipment can be then carefully calculated, when it is lower than the minimal critical mass, and on the basis of a safety analysis, we will be free of any constraints regarding criticality control, this allowing to make procedures easier, and to speed up the operations

  9. Dismantling of nuclear facilities. From a structural engineering perspective

    International Nuclear Information System (INIS)

    Block, Carsten; Henkel, Fritz-Otto; Bauer, Thomas

    2014-01-01

    The paper summarizes some important aspects, requirements and technical boundary conditions that need to be considered in dismantling projects in the nuclear sector from a structural engineering perspective. Besides general requirements regarding radiation protection, occupational safety, efficiency and cost effectiveness it is important to take into account other conditions which have a direct impact on technical details and the structural assessment of the dismantling project. These are the main aspects highlighted in this paper: - The structural assessment of dismantling projects has to be based on the as-built situation. - The limitations in terms of available equipment and space have to be taken into account. - The structural assessments are often non-standardized engineering evaluations. A selection of five dismantling projects illustrates the various structural aspects. (orig.)

  10. EUROSAFE forum 2013. Safe disposal of nuclear waste

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2013-07-01

    The proceedings of the EUROSAFE forum 2013 - safe disposal of nuclear waste include contributions to the following topics: Nuclear installation safety - assessment; nuclear installation safety - research; waste and decommissioning - dismantling; radiation protection, 3nvironment and emergency preparedness; security of nuclear installations and materials.

  11. An Evaluation of Dismantling Scenarios Using a Computer Simulation Technology for KRR-1 and 2

    International Nuclear Information System (INIS)

    Kim, S.K.; Park, H.S.; Lee, K.W.; Oh, W.Z.; Park, J.H.

    2006-01-01

    A graphic simulation has been used to design and verify new equipment and has also been expanded to virtual prototyping technology [1∼5]. In the nuclear decommissioning field, this technology has been utilized to validate the design of dismantling processes and to check the interferences and collisions in dismantling scenarios. However, a graphic simulation only provides us with visible result it just provides us with illustrative information of the decommissioning process. A scenario evaluation program has been developed using the computer simulation technology to create an efficient decommissioning plan. In the D and D planning stage, it is important that the scenarios are evaluated from a engineering point of view because the decommissioning work has to be executed economically and safely following the best scenarios. Therefore, we need several modules to evaluate scenarios. We composed the systems like this: 1. Decommissioning DB module for managing the decommissioning activity information (nuclear facility data, worker's data, radioactive inventory date, etc.). Dismantling process evaluation module 3. Visualization module for a radioactive inventory and a dismantling process using 3D CAD and virtual reality technology. 4. Analysis module for the evaluation results of a dismantling process. The evaluation module's capabilities produce a dismantling schedule, quantify radioactive waste, visualize a radioactive inventory, estimate a decommissioning cost, estimate a worker's exposure, and check for interference/collisions. After using the simulation results, the expert ranking system to evaluate scenarios for economics and worker's safety are implemented. The expert ranking system is a powerful and flexible decision making process to help set priorities and make the best decisions when both the qualitative and quantitative aspects of a decision need to be considered. By reducing complex decisions to a series of one-on-one comparisons, then synthesizing the

  12. Treatment of concrete bars from the dismantling of hot cells

    International Nuclear Information System (INIS)

    Graf, A.; Stutz, U.; Valencia, L.

    2002-01-01

    The Central Decontamination Operations Department (HDB) of the Karlsruhe Research Center operates facilities for the disposal of radioactive waste. In general, their objective is to decontaminate radioactive residues for unrestricted release in order to minimize the volume of waste products suitable for repository storage. In the case of about 120 concrete bars from the dismantling of hot cells, we reduce the volume of radioactive waste by sawing off the most contaminated parts of the bar. If there are no insertions such as cables or ventilation systems, the rest of the bar is sandblasted and its activity manually measured to ensure compliance with the release criteria. Otherwise, the bar is minced into small pieces by a power shovel. Afterwards, the rubble is filled into drums and its activity is measured by the clearance measurement facility. If the rubble and the sandblasted bars do not exceed the activity limit specified by the release criteria, the material is disposed of without further regulations for unrestricted use. Those parts of the bars which can not be released must be stored in special containers suitable for the KONRAD final disposal. Using this method, about 70 % of the total mass can be released. (author)

  13. Mixed Waste Focus Area - Waste form initiative

    International Nuclear Information System (INIS)

    Nakaoka, R.; Waters, R.; Pohl, P.; Roach, J.

    1998-01-01

    The mission of the US Department of Energy's (DOE) Mixed Waste Focus Area (MWFA) is to provide acceptable technologies that enable implementation of mixed waste treatment systems which are developed in partnership with end-users, stakeholders, tribal governments, and regulators. To accomplish this mission, a technical baseline was established in 1996 and revised in 1997. The technical baseline forms the basis for determining which technology development activities will be supported by the MWFA. The primary attribute of the technical baseline is a set of prioritized technical deficiencies or roadblocks related to implementation of mixed waste treatment systems. The Waste Form Initiative (WFI) was established to address an identified technical deficiency related to waste form performance. The primary goal of the WFI was to ensure that the mixed low-level waste (MLLW) treatment technologies being developed, currently used, or planned for use by DOE would produce final waste forms that meet the waste acceptance criteria (WAC) of the existing and/or planned MLLW disposal facilities. The WFI was limited to an evaluation of the disposal requirements for the radioactive component of MLLW. Disposal requirements for the hazardous component are dictated by the Resource Conservation and Recovery Act (RCRA), and were not addressed. This paper summarizes the technical basis, strategy, and results of the activities performed as part of the WFI

  14. Who should foot the bill? A discussion of alternative organizational models to finance dismantling and radioactive waste disposal; Wer soll die Zeche zahlen? Diskussion alternativer Organisationsmodelle zur Finanzierung von Rueckbau und Endlagerung

    Energy Technology Data Exchange (ETDEWEB)

    Jaensch, Elisabeth; Hirschhausen, Christian von; Moeckel, Christian [Technische Univ. Berlin (Germany). Wirtschafts- und Infrastrukturpolitik; Brunnengraeber, Achim [Freie Univ. Berlin (Germany). Forschungszentrum fuer Umweltpolitik (FFU)

    2017-09-01

    Based on the costs-by-cause principle everybody has to be responsible for the environmental damage produced. Accordingly the electricity supply companies should have to pay for the dismantling of nuclear power plants and the radioactive waste disposal. The implementation of a fond under public law seems to be an adequate solution. Critical arguments concerning the costs-by-cause principle shows that instead of a constrained enforcement of this principle a solution in the sense of the society as a whole should be in the focus.

  15. Strategy of Construction and Demolition Waste Management after Chemical Industry Facilities Removal

    Science.gov (United States)

    Tashkinova, I. N.; Batrakova, G. M.; Vaisman, Ya I.

    2017-06-01

    Mixed waste products are generated in the process of irrelevant industrial projects’ removal if conventional techniques of their demolition and dismantling are applied. In Russia the number of unused chemical industry facilities including structures with high rate of wear is growing. In removing industrial buildings and production shops it is used conventional techniques of demolition and dismantling in the process of which mixed waste products are generated. The presence of hazardous chemicals in these wastes makes difficulties for their use and leads to the increasing volume of unutilized residues. In the process of chemical industry facilities’ removal this fact takes on special significance as a high level of hazardous chemicals in the waste composition demands for the realization of unprofitable measures aimed at ensuring environmental and industrial safety. The proposed strategy of managing waste originated from the demolition and dismantling of chemical industry facilities is based on the methodology of industrial metabolism which allows identifying separate material flows of recycled, harmful and ballast components, performing separate collection of components during removal and taking necessary preventive measures. This strategy has been tested on the aniline synthesis plant being in the process of removal. As a result, a flow of 10 wt. %, subjected to decontamination, was isolated from the total volume of construction and demolition waste (C&D waste). The considered approach allowed using the resource potential of more than 80wt. % of waste and minimizing the disposed waste volume.

  16. PCBs and PCDD/Fs in soil from informal e-waste recycling sites and open dumpsites in India: Levels, congener profiles and health risk assessment.

    Science.gov (United States)

    Chakraborty, Paromita; Selvaraj, Sakthivel; Nakamura, Masafumi; Prithiviraj, Balasubramanian; Cincinelli, Alessandra; Bang, John J

    2018-04-15

    Growth of informal electronic waste (e-waste) recycling sector is an emerging problem for India. The presence of halogenated compounds in e-wastes may result in the formation of persistent organic pollutants like polychlorinated biphenyls (PCBs), polychlorinated dibenzo-p-dioxins and dibenzofurans (PCDD/Fs) during recycling processes. We therefore investigated PCBs and PCDD/Fs in surface soils explicitly from the informal e-waste recycling sites and nearby open dumpsites of major metropolitan cities from four corners of India, viz., New Delhi (North), Kolkata (East), Mumbai (West) and Chennai (South). In the informal e-waste recycling sites, the range of Σ 26 PCBs (0.4-488ng/g) and ƩPCDD/Fs (1.0-10.6ng/g) were higher than Ʃ 26 PCBs (0.3-21ng/g) and ƩPCDD/Fs (0.15-7.3ng/g) from open dumpsites. In the e-waste sites, ƩPCDDs were found with increasing trend from ƩTetraCDD to OctaCDD, whereas ƩPCDFs showed a reverse trend. The dominance of PCDF congeners and maximum toxicity equivalents (TEQ) for both PCDDs (17pg TEQ/g) and PCDFs (82pg TEQ/g) at Mandoli in New Delhi has been related to intensive precious metal recovery process using acid bath. Among dumpsites, highest TEQ for PCDD/Fs was observed at Kodangaiyur dumpsite of Chennai (CN DS -02, 45pg TEQ/g). Positive Matrix Factorization (PMF) model identified distinct congener pattern based on the functional activities, such as e-waste dismantling, shredding, precious metal recovery and open burning in dumpsites. E-waste metal recovery factor was loaded with 86-91% of PCB-77, -105, -114, -118 and 30% of PCB-126, possibly associated with the burning of wires during the copper extraction process. Almost 70% of the Ʃ 26 PCB concentrations was comprised of the dioxin-like PCB congeners with a maximum concentration of 437ng/g at New Moore market in Chennai, followed by Wire Lane (102ng/g), in Mumbai. We speculate that PCB-126 might have resulted from combustion of plastic materials in e-waste stream and dumped waste

  17. Decision support system for the dismantling of building in nuclear facilities

    International Nuclear Information System (INIS)

    Zeiher, M.

    2009-01-01

    In case of decommissioning and dismantling the complex structure of nuclear facilities requires a thorough selection of dismantling methods and a detailed operations planning. The decision for an appropriate technology with respect to economic, environmental and radiation protection aspects has to take into account that the different procedural steps are coordinated. Component specific boundary conditions and process parameters have to be considered. A data base was established that includes the process parameters for different dismantling methodologies. The next step is the determination of specific requirements of plant operators and engineers in order to identify the tasks in the frame of the dismantling process. The authors describes the decision support algorithm that allows to enhance the dismantling efficiency.

  18. Vandellos-I Dismantling nearing completion

    International Nuclear Information System (INIS)

    Armada, J. R.

    2004-01-01

    Spain is witnessing the phase-out of a nuclear power plant. It is a unique experience in our country and therefore the dismantling work has been watched closely, not only from here but also from abroad. The Empresa Nacional de Residuos Radiactivos (ENRESA) is in charge of managring the dismantling and decommissioning work of the Vandellos-1 nuclear power plant, located in the municipally of l' Hospitalet de l'Infant (Tarragona). The work began five years ago and has been executed on schedule. The appearance of what was one of the first Spanish commercial nuclear power plants has been changed radically to leave premises suitable for any other activity. (Author)

  19. The installation and dismantling of electrolytic cells

    International Nuclear Information System (INIS)

    Galushkin, N.V.

    1995-01-01

    This chapter of monograph is devoted to construction of aluminium electrolytic cells, their installation and dismantling. Therefore, the general characteristic and classification of aluminium electrolytic cells was considered. The anode and cathode structure was studied. The lining of cathode casing, the process of collection of anode gases, electrolytic cell cover, and electrical insulation was studied as well. The installation and dismantling of aluminium electrolytic cells was described.

  20. Disposition of excess weapons plutonium from dismantled weapons

    International Nuclear Information System (INIS)

    Jardine, L.J.

    1997-01-01

    With the end of the Cold War and the implementation of various nuclear arms reduction agreements, US and Russia have been actively dismantling tens of thousands of nuclear weapons. As a result,large quantities of fissile materials, including more than 100 (tonnes?) of weapons-grade Pu, have become excess to both countries' military needs. To meet nonproliferation goals and to ensure the irreversibility of nuclear arms reductions, this excess weapons Pu must be placed in secure storage and then, in timely manner, either used in nuclear reactors as fuel or discarded in geologic repositories as solid waste. This disposition in US and Russia must be accomplished in a safe, secure manner and as quickly as practical. Storage of this Pu is a prerequisite to any disposition process, but the length of storage time is unknown. Whether by use as fuel or discard as solid waste, disposition of that amount of Pu will require decades--and perhaps longer, if disposition operations encounter delays. Neither US nor Russia believes that long-term secure storage is a substitute for timely disposition of excess Pu, but long-term, safe, secure storage is a critical element of all excess Pu disposition activities

  1. Value estimation of end of life vehicles as a source of competitive advantage for dismantling station

    Directory of Open Access Journals (Sweden)

    Monika Kosacka

    2016-03-01

    Full Text Available   Background: End of Life vehicles become an emerging problem because of the type of waste which they are. Each country is creating own recycling network where ELVs are well secured and recycled. Poland is a country where the system is not working correct because of a high absorption of ELVs by illegal dismantling entities which are more competitive than legal elements of recycling network. The problem is well known but there is still lack of solution. The purpose of this article is to present the concept of tools for the valuation of ELVs in order to improve the competitiveness of disassembly stations. Methods: The research methodology consists of a literature review as well as observations, surveys, BPMN and UML diagrams. On the basis of literature review and observations the problem was identified. The surveys were elaborated in order to identify requirements for the concept of the tool. BPMN and UML diagrams were used to model the processes in dismantling station and the information flow between the user and the tool. Results: There was established a concept of the tool - ELV's Calculator which support decisions of ELV's value estimation. Conclusions: Improving competitiveness of legal dismantling station is extremely important issue in order to provide safe for Environment and People and economically justified ELVs' management. Legal entities have to follow the law what makes their business cost higher. This paper provides a solution of encouraging people to return ELVs to legal dismantlers by offering them price adequate to market demand.    

  2. Evapotranspiration Cover for the 92-Acre Area Retired Mixed Waste Pits, Area 5 Waste Management Division, Nevada National Security Site, Final CQA Report

    International Nuclear Information System (INIS)

    2012-01-01

    The report is the Final Construction Quality Assurance (CQA) Report for the 92-Acrew Evapotranspiration Cover, Area 5 Waste Management Division Retired Mixed Waste Pits, Nevada National Security Site, Nevada, for the period of January 20, 2011, to January 31, 2012 The Area 5 RWMS uses engineered shallow-land burial cells to dispose of packaged waste. The 92-Acre Area encompasses the southern portion of the Area 5 RWMS, which has been designated for the first final closure operations. This area contains 13 Greater Confinement Disposal (GCD) boreholes, 16 narrow trenches, and 9 broader pits. With the exception of two active pits (P03 and P06), all trenches and pits in the 92-Acre Area had operational covers approximately 2.4 meters thick, at a minimum, in most areas when this project began. The units within the 92-Acre Area are grouped into the following six informal categories based on physical location, waste types and regulatory requirements: (1) Pit 3 Mixed Waste Disposal Unit (MWDU); (2) Corrective Action Unit (CAU) 111; (3) CAU 207; (4) Low-level waste disposal units; (5) Asbestiform low-level waste disposal units; and (6) One transuranic (TRU) waste trench.

  3. The market of nuclear plant dismantling. The new EDF's strategy, process standardisation, robotization: which perspectives for the market by 2030?

    International Nuclear Information System (INIS)

    2017-09-01

    Dismantling appears as the most promising activity in the nuclear sector due to ageing plants, to ambitious objectives of reduction of the nuclear share in the energy mix, or to high expertise of French companies in robotic and digital solutions for deconstruction in radioactive environments. However, the development of the dismantling market depends on EDF decisions: the extension of nuclear reactor lifetime postpones the development of this market. In this context, this study aims at giving an anticipated view of the plant dismantling market by 2030, at deciphering growth levers for the sector actors, and at understanding the sector operation and the business model of operators. Thus, the report presents the main components of the market (key figures, dismantling types, dismantling steps, sector ecosystem, barriers to enter the market, costs, contractual relationships), proposes an analysis of the market and of its perspectives (situation in France, and at the world level, predictive scenario for 2030), and discusses the development axes and demand evolutions (robotization and digitalisation, elaboration of standardised processes, management of wastes produced by nuclear dismantling, internationalisation of French actors). It also proposes an overview of actors in France, and identity sheets for commissioners (EDF, New Areva), contractors (Onet, Vinci, Engie), and other actors (Veolia, Assystem, Ortec, Cybernetix, Oreka Group). The last part proposes synthetic sheets for more than 110 companies of the sector (general information, management and financial performance data under the form of tables and figures) and comparative tables according to 5 key indicators. Data are presented for a period ranging from 2010 to 2016

  4. Sustainable design for automotive products: dismantling and recycling of end-of-life vehicles.

    Science.gov (United States)

    Tian, Jin; Chen, Ming

    2014-02-01

    The growth in automotive production has increased the number of end-of-life vehicles (ELVs) annually. The traditional approach ELV processing involves dismantling, shredding, and landfill disposal. The "3R" (i.e., reduce, reuse, and recycle) principle has been increasingly employed in processing ELVs, particularly ELV parts, to promote sustainable development. The first step in processing ELVs is dismantling. However, certain parts of the vehicle are difficult to disassemble and use in practice. The extended producer responsibility policy requires carmakers to contribute in the processing of scrap cars either for their own developmental needs or for social responsibility. The design for dismantling approach can be an effective solution to the existing difficulties in dismantling ELVs. This approach can also provide guidelines in the design of automotive products. This paper illustrates the difficulty of handling polymers in dashboards. The physical properties of polymers prevent easy separation and recycling by using mechanical methods. Thus, dealers have to rely on chemical methods such as pyrolysis. Therefore, car designers should use a single material to benefit dealers. The use of materials for effective end-of-life processing without sacrificing the original performance requirements of the vehicle should be explored. Copyright © 2013 Elsevier Ltd. All rights reserved.

  5. Overall strategy of Creys Malville power station dismantling

    International Nuclear Information System (INIS)

    Alphonse, P.

    2002-01-01

    The power station was stopped by a government decision following the elections in 1997. This shutdown was then made official by a letter dated April 1998 and the decree of December 1998. This was a non-technical shutdown and as such had not been envisaged; there has been no early warning. Current dismantling strategy: The studies leading to shutdown and then dismantling were engaged in 1998 based on a scenario with a status corresponding to IAEA level 2 until 2046. In 2001, EDF management made the decision to dismantle all the first generation power stations and Creys Malville between now and 2025. It should be noted that the presence of strongly irradiated stellite in the Creys Malville reactor would still require remote systems for working in the reactor block after 2046. The sequence of operations dictated by the dismantling strategy is as follows: eliminate the risks as soon as possible and in particular the risk related to the sodium, 3300 tonnes of which is kept in liquid form in the reactor vessel; dismantle the most active parts which are too radioactive to be sent to the existing or planned storage centres. This may lead to on-site storage to allow decay to occur before sending to a storage centre; planning of the work interventions in order to limit the costs

  6. An Applied Study on the Decontamination and Decommissioning of Hot Cell Facilities in the United States and Comparison with the Studsvik Facility for Solid and Liquid Waste

    International Nuclear Information System (INIS)

    Varley, Geoff; Rusch, Chris

    2006-07-01

    tendency to assume optimal circumstances and tend not to account for potential changes of circumstances in, for example, the regulatory environment and requirements. It therefore may be prudent to review in general the cost allowances for efforts in this category. The estimate for decontamination and dismantling overall appears to be reasonable. Areas where additional costs could occur (e.g. hot cell concrete) have been identified in this report. Additional cost for waste disposal would be the main consequence if such contamination were found. One of the big differences between the plan and the outcome at HCF was the amount of dismantling waste that had to be disposed of as active waste. The HM facility appears to be in much better radiological condition overall than HCF but it cannot be discounted that surprises are found and/or regulatory requirements change regarding the dumping of waste. If an engineered solution (concrete cutting) were required to dismantle the hot cell, a substantial additional cost could apply. Following on from the above comments, the HM estimate does not include any significant allowance for characterisation/radiological mapping of the facility prior to designing and planning the decontamination and dismantling work. The development of an accurate picture before proceeding with the work normally is a prudent and beneficial step to take. An additional estimated cost of up to MSEK 3 could apply for such an exercise. The treatment of uncertainty in developing the HM cost estimate seems to have followed the pattern of other cost estimates analysed by NAC, whereby a round percentage number has been added to certain base estimates. As recommended in reference 4, a more focused approach based on identifying the main potential cost sensitivities and then dealing with them in a more individual manner would be preferable

  7. An Applied Study on the Decontamination and Decommissioning of Hot Cell Facilities in the United States and Comparison with the Studsvik Facility for Solid and Liquid Waste

    Energy Technology Data Exchange (ETDEWEB)

    Varley, Geoff; Rusch, Chris [NAC International, Atlanta, GA (United States)

    2006-07-15

    have a tendency to assume optimal circumstances and tend not to account for potential changes of circumstances in, for example, the regulatory environment and requirements. It therefore may be prudent to review in general the cost allowances for efforts in this category. The estimate for decontamination and dismantling overall appears to be reasonable. Areas where additional costs could occur (e.g. hot cell concrete) have been identified in this report. Additional cost for waste disposal would be the main consequence if such contamination were found. One of the big differences between the plan and the outcome at HCF was the amount of dismantling waste that had to be disposed of as active waste. The HM facility appears to be in much better radiological condition overall than HCF but it cannot be discounted that surprises are found and/or regulatory requirements change regarding the dumping of waste. If an engineered solution (concrete cutting) were required to dismantle the hot cell, a substantial additional cost could apply. Following on from the above comments, the HM estimate does not include any significant allowance for characterisation/radiological mapping of the facility prior to designing and planning the decontamination and dismantling work. The development of an accurate picture before proceeding with the work normally is a prudent and beneficial step to take. An additional estimated cost of up to MSEK 3 could apply for such an exercise. The treatment of uncertainty in developing the HM cost estimate seems to have followed the pattern of other cost estimates analysed by NAC, whereby a round percentage number has been added to certain base estimates. As recommended in reference 4, a more focused approach based on identifying the main potential cost sensitivities and then dealing with them in a more individual manner would be preferable.

  8. On evaluation of assessments of accruals of future dismantling costs

    Energy Technology Data Exchange (ETDEWEB)

    Labor, Bea [B D Projects 2013, Gdansk (Poland); Lindskog, Staffan [Swedish Radiation Safety Authority, Solna (Sweden)

    2013-07-01

    A major prerequisite in order for civilian commercial nuclear energy production to qualify as sustainable energy production is that systems for the management of the nuclear waste legacy are in operation. These waste types are present in a range from very low short lived waste (VLLW) to long lived high level waste (HLW) (including the used nuclear fuel). The second prerequisite is that financial responsibilities or other constraints must not be passed on to coming generations. The first condition for qualification corresponds to the Polluters Pays Principle (PPP) which demands that the responsibility for the waste management rests solely with the polluter. The second qualification corresponds to the principle of fairness between generations and thus concerns the appropriate distribution of responsibilities between the generations. It is important to note that these two conditions must be met simultaneously, and that compliance with both is a necessary prerequisite in order for commercial use of nuclear power to qualify as a semi-sustainable energy source. Financial and technical planning for dismantling and decommissioning of nuclear installations cannot be regarded as successful unless it rests upon a distinctive way to describe and explain the well-founded values of different groups of stakeholders. This cumbersome task can be underpinned by transparent and easy to grasp models for calculation and estimation of future environmental liabilities. It essential that a systematic classification is done of all types of costs and that an effort is done to evaluate the precision level in the cost estimates. In this paper, a systematic and transparent way to develop a parametric approach that rest upon basic accounting standards is combined with data about younger stakeholder's values towards decommissioning and dismantling of nuclear installation. The former entity rests upon theoretical and practical methods from business administration, whilst the latter is based

  9. On evaluation of assessments of accruals of future dismantling costs

    International Nuclear Information System (INIS)

    Labor, Bea; Lindskog, Staffan

    2013-01-01

    A major prerequisite in order for civilian commercial nuclear energy production to qualify as sustainable energy production is that systems for the management of the nuclear waste legacy are in operation. These waste types are present in a range from very low short lived waste (VLLW) to long lived high level waste (HLW) (including the used nuclear fuel). The second prerequisite is that financial responsibilities or other constraints must not be passed on to coming generations. The first condition for qualification corresponds to the Polluters Pays Principle (PPP) which demands that the responsibility for the waste management rests solely with the polluter. The second qualification corresponds to the principle of fairness between generations and thus concerns the appropriate distribution of responsibilities between the generations. It is important to note that these two conditions must be met simultaneously, and that compliance with both is a necessary prerequisite in order for commercial use of nuclear power to qualify as a semi-sustainable energy source. Financial and technical planning for dismantling and decommissioning of nuclear installations cannot be regarded as successful unless it rests upon a distinctive way to describe and explain the well-founded values of different groups of stakeholders. This cumbersome task can be underpinned by transparent and easy to grasp models for calculation and estimation of future environmental liabilities. It essential that a systematic classification is done of all types of costs and that an effort is done to evaluate the precision level in the cost estimates. In this paper, a systematic and transparent way to develop a parametric approach that rest upon basic accounting standards is combined with data about younger stakeholder's values towards decommissioning and dismantling of nuclear installation. The former entity rests upon theoretical and practical methods from business administration, whilst the latter is based

  10. Solid waste management in Khartoum industrial area

    International Nuclear Information System (INIS)

    Elsidig, N. O. A.

    2004-05-01

    This study was conducted in Khartoum industrial area (KIA). The study discusses solid waste generation issues in KIA as well as solid waste collection, storage, transport and final disposal methods. A focus on environmental impact resulting from the accumulation of solid waste was presented by reviewing solid waste management in developed as well as developing countries starting from generation to final disposal. Environmental health legislation in Sudan was investigated. The study covers all the (eight) industrial sub-sectors presented in KIA. The main objective of the study is to assess the situation of solid waste in KIA. To fulfill the objectives of the study the researcher deemed it necessary to explore problems related to solid waste generation and solid waste arrangement with special emphasis on final disposal methods. Practically, 31 (thirty-one) factories representing the different industrial sub-sectors in KIA were studied. This represents 25% of the total number of factories located in KIA. Data were obtained by, questionnaires, interviews and observations mainly directed to concerned officials, solid waste workers, pickers and brokers. Obtained data were stored, coded, tabulated and analyzed using the computer systems (excel and SPSS programmes). The obtained results should clear deficiency in the management of solid waste which led to great environmental deterioration in KIA and neighboring residential areas. The environment in studied area is continuously polluted due to high pollution loads and unproved solid waste management. In order to maintain health environment operating factories have to pretreated their solid waste according to the recognized standards and waste minimization techniques such as recycling and re use should be widely applied, moreover, running crash programme for environmental sanitation in Khartoum state should be expanded and improved to include special characteristics of solid waste from industries. Finally, increase awareness

  11. Occurrence of emerging flame retardants from e-waste recycling activities in the northern part of Vietnam

    Directory of Open Access Journals (Sweden)

    Masayuki Someya

    2016-06-01

    Full Text Available This study investigated the contamination status of 21 emerging flame retardants (FRs in soils (n = 32 and river sediments (n = 8 from an e-waste recycling (EWR site in the northern part of Vietnam. Among analyzed FRs, higher levels of decabromodiphenyl ethane (DBDPE (ND–4200 ng/g dw, 1,2-bis-(2,4,6-tribromophenoxyethane (BTBPE (ND–350 ng/g dw and Dechlorane Plus isomers (DPs (ND–65 ng/g dw were found in soils near EWR workshops and open burning places. The highest concentrations of DBDPE (20 ng/g dw, BTBPE (5.7 ng/g dw and DPs (6.7 ng/g dw were also detected in sediments collected from the middle of the EWR site. The levels decreased concomitantly with increasing distance from the EWR site. These results indicate that these FRs were released to the surrounding environment from improper recycling activities, such as manual dismantling of devices and open burning of e-wastes. Moreover, the estimated daily intakes of those FRs via soil ingestion were approximately ten times higher for children than adults. To our knowledge, this is a first comprehensive study on characterization of soil and sediment contamination by a series of emerging FRs at an EWR site in Vietnam.

  12. Lessons-learned from ongoing decommissioning project of Fugen NPS

    International Nuclear Information System (INIS)

    Tezuka, M.; Koda, Y.; Iguchi, Y.; Kato, Y.; Yanagihara, S.

    2017-01-01

    Advanced Thermal Reactor (ATR) Fugen is a 557 MWt, 165 MWe, heavy water moderated, light-water cooled, pressure-tube type reactor. In 2003, Fugen was shut down after ca 25 years operation, and started decommissioning activity from 2008. In the initial period of decommissioning, we have been dismantling from turbine systems because of their little contamination. In general, most difficult process of dismantling of nuclear power plant is the dismantlement of the reactor core because the radiation rate of the reactor core is very high, e.g., it is over 200 Sv/hr in the Fugen's case. Our plan of dismantlement of the core is from about 2022. The core area has some features that the structure is narrow and complicated by tube-cluster structure that contains 224 fuel channels with both the pressure and the calandria tubes coaxially in each channel. The radiation shielding area is laminated structure composed of up to 150 mm thickness of carbon steel. And the structure of the reactor, which is made of various materials such as stainless steel, carbon steel, zirconium alloy and aluminum. In particular, the core area is planning to be dismantled under water by remote controlled machines in order to shield the radiation around the core and prevent airborne dust generated by the cutting considering the usage of Zr alloy which is likely to be oxidized. In consideration of above, the cutting methods were selected for dismantling the reactor core in order to shorten the dismantling term and reduce the secondary waste. The candidate cutting method options were decreased based on the results of the researches on achievement of the cutting methods domestically and internationally. Finally, the laser cutting method was selected for dismantling the core area and shielding area, and diamond wire saw was also selected for dismantling the shielding area applicable to concrete with metal liner, based on the results of some cutting tests. The laser cutting method has many advantages, e

  13. Use of laser cutting techniques for dismantling tasks in nuclear facilities

    International Nuclear Information System (INIS)

    Haferkamp, H.; Drygalla, M.; Goede, M.

    2001-01-01

    A handguided laser processing system developed by laser zentrum Hannover e.V. (LZH) allows impressive cutting, notching, and material removal applications for the dismantling of nuclear power plants. The handguided unit is equipped with a motor drive for consistent processing results and flexible processing for as long as desired. It offers the possibility to adjust the nozzle as well as focal position in order that various materials with different material thicknesses may be processed. The set process parameters may be viewed on a display which also indicates the laser processing programme selected. An integrated exhaust system guarantees a shielded process. The operator is not only protected against process emissions but also against laser beam reflexions. The handguided unit is connected to the laser beam source via an optical fibre and can be used for laser output powers of up to 1500 W with a high beam quality. For handguided laser material processing low emissions at high feed rates as well as cutting kerf widths between 0.5 and 0.3 mm for special applications such as the dismantling of large facilities or units, etc. are decisive, especially when cutting metal sheets for the dismantling of nuclear power plants. (orig.)

  14. Use of laser cutting techniques for dismantling tasks in nuclear facilities

    Energy Technology Data Exchange (ETDEWEB)

    Haferkamp, H.; Drygalla, M.; Goede, M. [Laser Zentrum Hannover e.V. (Germany)

    2001-07-01

    A handguided laser processing system developed by laser zentrum Hannover e.V. (LZH) allows impressive cutting, notching, and material removal applications for the dismantling of nuclear power plants. The handguided unit is equipped with a motor drive for consistent processing results and flexible processing for as long as desired. It offers the possibility to adjust the nozzle as well as focal position in order that various materials with different material thicknesses may be processed. The set process parameters may be viewed on a display which also indicates the laser processing programme selected. An integrated exhaust system guarantees a shielded process. The operator is not only protected against process emissions but also against laser beam reflexions. The handguided unit is connected to the laser beam source via an optical fibre and can be used for laser output powers of up to 1500 W with a high beam quality. For handguided laser material processing low emissions at high feed rates as well as cutting kerf widths between 0.5 and 0.3 mm for special applications such as the dismantling of large facilities or units, etc. are decisive, especially when cutting metal sheets for the dismantling of nuclear power plants. (orig.)

  15. Groundwater Quality Assessment for Waste Management Area U: First Determination

    Energy Technology Data Exchange (ETDEWEB)

    Hodges, Floyd N.; Chou, Charissa J.

    2000-08-04

    As a result of the most recent recalculation one of the indicator parameters, specific conductance, exceeded its background value in downgradient well 299-W19-41, triggering a change from detection monitoring to groundwater quality assessment program. The major contributors to the higher specific conductance are nonhazardous constituents (i.e., sodium, calcium, magnesium, chloride, sulfate, and bicarbonate). Nitrate, chromium, and technetium-99 are present and are increasing; however, they are significantly below their drinking waster standards. Interpretation of groundwater monitoring data indicates that both the nonhazardous constituents causing elevated specific conductance in groundwater and the tank waste constituents present in groundwater at the waste management area are a result of surface water infiltration in the southern portion of the facility. There is evidence for both upgradient and waste management area sources for observed nitrate concentrations. There is no indication of an upgradient source for the observed chromium and technetium-99.

  16. Economical dismantling of nuclear power stations

    International Nuclear Information System (INIS)

    Mallok, J.; Andermann, H.

    1999-01-01

    The dismantling of nuclear power stations requires a high degree of security and economic efficiency due to the strong contamination of components and the close spatial conditions. In order to protect involved staff from radiation, modern remote-controlled technology is applied in sectors with heavy radioactive contamination such as reactor pressure vessels. The article shows, that the dismantling of reactor pressure vessels using a remote-controlled milling machine developed by the Siemens subsidiary Mechanik Center Erlangen GmbH, can be done in a secure and efficient way. (orig.) [de

  17. Guidelines for Waste Accumulation Areas (WAAs) at LBL. Revision 1

    International Nuclear Information System (INIS)

    1994-01-01

    The purpose of this document is to set conditions for establishing and containing areas for the accumulation of hazardous waste at LBL. Areas designed for accumulation of these wastes for up to 90 days in quantities greater than 55 gallons (208 liters) of hazardous waste, one quart (0.946 liter) of extremely hazardous waste, or one quart (0.946 liter) of acutely hazardous waste are called Waste Accumulation Areas (WAAs). Areas designed for accumulation of wastes in smaller amounts are called Satellite Accumulation Areas (SAAs). This document provides guidelines for employee and organizational responsibilities for WAAs, constructing a WAA, storing waste in a WAA, operating and maintaining a WAA, and responding to spills in a WAA

  18. Heavy metal and persistent organic compound contamination in soil from Wenling: an emerging e-waste recycling city in Taizhou area, China.

    Science.gov (United States)

    Tang, Xianjin; Shen, Chaofeng; Shi, Dezhi; Cheema, Sardar A; Khan, Muhammad I; Zhang, Congkai; Chen, Yingxu

    2010-01-15

    The present study was conducted to investigate the levels and sources of heavy metals (Cu, Cr, Cd, Pb, Zn, Hg and As) and persistent organic compounds including polycyclic aromatic hydrocarbons (PAHs) and polychlorinated biphenyls (PCBs) in soils taken from Wenling, an emerging e-waste recycling city in Taizhou, China. The results suggested that most heavy metals exceeded the respective Grade II value of soil quality standards from State Environmental Protection Administration of China and also exceeded the Dutch optimum values. Total PAHs in soil ranged from 371.8 to 1231.2 microg/kg, and relatively higher PAHs concentrations were found in soils taken from simple household workshops. PCBs were detectable in all samples with total concentrations ranging from 52.0 to 5789.5 microg/kg, which were 2.1-232.5 times higher than that from the reference site (24.9 microg/kg). Results of this study suggested soil in the Wenling e-waste recycling area were heavily contaminated by heavy metals, PAHs and PCBs. Furthermore, compared with large-scale plants, simple household workshops contributed more heavy metals, PAHs and PCBs pollution to the soil environment, indicating that soil contamination from e-waste recycling in simple household workshops should be given more attention.

  19. Estimating Radiological Doses to Predators Foraging in a Low-Level Radioactive Waste Management Area

    International Nuclear Information System (INIS)

    L.Soholt; G.Gonzales; P.Fresquez; K.Bennett; E.Lopez

    2003-01-01

    Since 1957, Los Alamos National Laboratory has operated Area G as its low-level, solid radioactive waste management and disposal area. Although the waste management area is developed, plants, small mammals, and avian and mammalian predators still occupy the less disturbed and revegetated portions of the land. For almost a decade, we have monitored the concentrations of selected radionuclides in soils, plants, and small mammals at Area G. The radionuclides tritium, plutonium-238, and plutonium-239 are regularly found at levels above regional background in all three media. Based on radionuclide concentrations in mice collected from 1994 to 1999, we calculated doses to higher trophic levels (owl, hawk, kestrel, and coyote) that forage on the waste management area. These predators play important functions in the regional ecosystems and are an important part of local Native American traditional tales that identify the uniqueness of their culture. The estimated doses are compared to Department of Energy's interim limit of 0.1 rad/day for the protection of terrestrial wildlife. We used exposure parameters that were derived from the literature for each receptor, including Environmental Protection Agency's exposure factors handbook. Estimated doses to predators ranged from 9E-06 to 2E-04 rad/day, assuming that they forage entirely on the waste management area. These doses are greater than those calculated for predators foraging exclusively in reference areas, but are still well below the interim dose limit. We believe that these calculated doses represent upper-bound estimates of exposure for local predators because the larger predators forage over areas that are much greater than the 63-acre waste management area. Based on these results, we concluded that predators foraging on this area do not face a hazard from radiological exposure under current site conditions

  20. Elevated lead levels from e-waste exposure are linked to decreased olfactory memory in children.

    Science.gov (United States)

    Zhang, Bo; Huo, Xia; Xu, Long; Cheng, Zhiheng; Cong, Xiaowei; Lu, Xueling; Xu, Xijin

    2017-12-01

    Lead (Pb) is a developmental neurotoxicant and can cause abnormal development of the nervous system in children. Hence, the aim of this study was to investigate the effect of Pb exposure on child olfactory memory by correlating the blood Pb levels of children in Guiyu with olfactory memory tests. We recruited 61 preschool children, 4- to 7-years of age, from Guiyu and 57 children from Haojiang. The mean blood Pb level of Guiyu children was 9.40 μg/dL, significantly higher than the 5.04 μg/dL mean blood Pb level of Haojiang children. In addition, approximately 23% of Guiyu children had blood Pb levels exceeding 10.00 μg/dL. The correlation analysis showed that blood Pb levels in children highly correlated with e-waste contact (r s  = 0.393). Moreover, the mean concentration of serum BDNF in Guiyu children (35.91 ng/ml) was higher than for Haojiang (28.10 ng/ml) and was positively correlated with blood Pb levels. Both item and source olfactory memory tests at 15 min, 5 h and 24 h after odor exposure showed that scores were lower in Guiyu children indicative of reduced olfactory memory in Guiyu children. Olfactory memory tests scores negatively correlated with blood Pb and serum BDNF levels, but were positively associated with parental education levels. At the same time, scores of both tests on children in the high blood Pb level group (blood Pb levels > 5.00 μg/dL) were lower than those in the low blood Pb level group (blood Pb levels ≤ 5.00 μg/dL), implying that Pb exposure decreases olfactory memory in children. Our findings suggest that Pb exposure in e-waste recycling and dismantling areas could result in an increase in serum BDNF level and a decrease in child olfactory memory, in addition, BDNF might be involved in olfactory memory impairment. Copyright © 2017 Elsevier Ltd. All rights reserved.

  1. LEP Dismantling Reaches Half-Way Stage

    CERN Multimedia

    2001-01-01

    LEP's last superconducting module leaves its home port... Just seven months into the operation, LEP dismantling is forging ahead. Two of the eight arcs which form the tunnel have already been emptied and the last of the accelerator's radiofrequency (RF) cavities has just been raised to the surface. The 160 people working on LEP dismantling have reason to feel pleased with their progress. All of the accelerator's 72 superconducting RF modules have already been brought to the surface, with the last one being extracted on 2nd May. This represents an important step in the dismantling process, as head of the project, John Poole, explains. 'This was the most delicate part of the project, because the modules are very big and they could only come out at one place', he says. The shaft at point 1.8 through which the RF cavity modules pass is 18 metres in diameter, while each module is 11.5 metres long. Some modules had to travel more than 10 kilometres to reach the shaft. ... is lifted up the PM 1.8 shaft, after a m...

  2. Study on applicability of evaluation model of manpower needs for dismantling of equipments in FUGEN-1. Dismantling process in 3rd/4th feedwater heater room

    International Nuclear Information System (INIS)

    Shibahara, Yuji; Izumi, Masanori; Nanko, Takashi; Tachibana, Mitsuo; Ishigami, Tsutomu

    2010-10-01

    Manpower needs for the dismantling process on the dismantling of equipments in FUGEN 3rd/4th feedwater heater room was calculated with the management data evaluation system (PRODIA Code), and it was inspected whether the conventional evaluation model had applicability for FUGEN or not. It was confirmed that the conventional evaluation model for feedwater heater had no applicability. In comparison of the calculated value with the actual data, we found two difference: 1) the calculated value were significantly larger than the actual data, 2) the actual data for the dismantling of 3rd feedwater heater was twice larger than that of 4th feedwater heater, though these equipments were almost same weight. It was found that these were brought 1) by the difference in the work descriptions of dismantling between JPDR and FUGEN, and 2) by that in the cutting number between 3rd feedwater heater and 4th one. The manpower needs for the dismantling of both feedwater heaters were calculated with a new calculation equation reflecting the descriptions of dismantling, and it was found that these results showed the good agreement with the actual data. (author)

  3. Education and research when dismantling nuclear plants at the Technical University Dresden

    International Nuclear Information System (INIS)

    Hurtado, A.; Anthofer, A.; Cloppenborg, T.; Schreier, M.

    2013-01-01

    With the decision by the German government in 2011 to revoke the operating permission from 8 of the existing 17 German nuclear power plants, the responsibility of decommissioning and dismantling these plants has moved back into the focus of public awareness. Under the current legal conditions, the last nuclear plant will be disconnected from the grid on 31.12.2022 and this will create an enormous challenge for all the involved approving authorities, expert organisations, as well as companies involved in dismantling the plants. The development of new and efficient dismantling technologies and strategies is required to perform these highly responsible tasks. On the other hand, the nuclear competence and knowhow, as well as the promotion of young talents in the relevant scientific fields must be preserved. Technological and economic solutions are in demand for the various plants due to the different specifics of nuclear power plants. This will still require e.g. in the field of radiation protection highly qualified and well trained staff in future. The training of these skilled employees will require expanding the subject matter taught at universities, colleges and polytechnics to suit the changed parameters. The chair for hydrogen and nuclear energy technology at the TU Dresden will in future offer lectures as part of a new teaching discipline with the focus on dismantling and disposal. The course 'Dismantling nuclear power plants' took place for the first time in the summer semester 2013. It is organised as a three-day block seminar with an excursion to the company NIS Ingenieurgesellschaft mbH in Alzenau. The company NIS is a subsidiary of the Siempelkamp Nukleartechnik GmbH. This article intends to provide an overview of the contents of the courses and the impressions of the participants. In this way the TU Dresden is making a further contribution to preserving nuclear competence and inter-disciplinary dialogue. (orig.)

  4. Development of a handling technology for underwater inspection and dismantling

    International Nuclear Information System (INIS)

    Rose, N.

    1994-01-01

    For the purpose of underwater inspection and dismantling of nuclear facilities, a prototype of a freely submersible, remote-controlled handling system was developed and tested under laboratory conditions. Particular interest was taken in the specific boundary conditions of the area of application and the methodological concept. The system was developed in three phases; in each phase, a prototype was constructed and tested. (orig.) [de

  5. Let’s limit our waste production and let’s’ sort it!

    CERN Multimedia

    HSE Unit

    2013-01-01

    Let’s limit our waste production! – Why ? Preventing the production of waste is the best solution to avoid environmental issues, economic impacts and technical constraints. So, whenever you are involved in the design, manufacturing, distribution, use or dismantling of a product or an activity in general, always remember that the best waste is that which is not produced. The limitation of waste production being an HSE objective declared in 2013 by the CERN Director-General, we encourage everyone to help limit the amount of waste produced through CERN activities. Let’s sort it! – Why ? Since the 90s, CERN has implemented a policy to promote recovery of the waste* generated by its activities. Nowadays, CERN is committed to continuously improving its sorting and recovery and therefore various initiatives have been started by GS-IS to improve the recovery of waste (e.g. recovery of organic waste from restaurants; implementation of solar trash compactors - see Bulletin 27-...

  6. Cutting and decontamination technologies for nuclear facility dismantling; Technologien zur Zerlegung und zur Dekontamination von kerntechnischen Anlagen

    Energy Technology Data Exchange (ETDEWEB)

    Huebner, Felix; Grone, Georg von; Schultmann, Frank

    2017-03-15

    The German Government's decision to phase-out nuclear power will lead to a substantial increase of the number of nuclear decommissioning and dismantling projects. The decommissioning of nuclear facilities must meet the requirements of the radiation protection ordinance. This study deals with the decontamination and dismantling technologies available to meet radiation protection requirements. The aim of this study is to determine the state of the art in the field of decommissioning and dismantling technologies. Furthermore, future trends in the development and application of such technologies should be identified. A detailed study of current literature provides an overview of established decommissioning technologies. Moreover, experts were consulted in order to facilitate a practical assessment. The experts' statements indicate that (apart from the chemical decontamination of the primary circuit) the use of mechanical methods is generally preferred. Abrasive methods are rated as particularly efficient. According to the experts, the development of new decontamination technologies may allow a more efficient decontamination. However, the success of a new technology will be subject to its application costs. Mechanical technologies are preferred for the dismantling of nuclear facilities. The band saw has been identified as a standard tool in nuclear dismantling. The survey has concluded that there is no need for new dismantling technologies. The potential lies in the optimization of existing processes and techniques. With regard to remotely operated systems, experts' opinions vary on whether the use of these systems will increase in future. Most areas inside a nuclear facility have low radiation levels that allow the use of human labour for the dismantling. However, there is a need for an improvement in the allocation and management of decommissioning projects.

  7. Handling e-waste in developed and developing countries: Initiatives, practices, and consequences

    Energy Technology Data Exchange (ETDEWEB)

    Sthiannopkao, Suthipong, E-mail: suthisuthi@gmail.com [Department of Environmental Engineering, College of Engineering, Dong-A University, 37 Nakdong-Daero 550 beon-gil Saha-gu, Busan (Korea, Republic of); Wong, Ming Hung [Croucher Institute for Environmental Sciences, Hong Kong Baptist University, Hong Kong (China)

    2013-10-01

    Discarded electronic goods contain a range of toxic materials requiring special handling. Developed countries have conventions, directives, and laws to regulate their disposal, most based on extended producer responsibility. Manufacturers take back items collected by retailers and local governments for safe destruction or recovery of materials. Compliance, however, is difficult to assure, and frequently runs against economic incentives. The expense of proper disposal leads to the shipment of large amounts of e-waste to China, India, Pakistan, Nigeria, and other developing countries. Shipment is often through middlemen, and under tariff classifications that make quantities difficult to assess. There, despite the intents of national regulations and hazardous waste laws, most e-waste is treated as general refuse, or crudely processed, often by burning or acid baths, with recovery of only a few materials of value. As dioxins, furans, and heavy metals are released, harm to the environment, workers, and area residents is inevitable. The faster growth of e-waste generated in the developing than in the developed world presages continued expansion of a pervasive and inexpensive informal processing sector, efficient in its own way, but inherently hazard-ridden. - Highlights: ► Much e-waste, expensive to process safely, illegally goes to developing countries. ► E-waste processing in developing countries pollutes with heavy metals and dioxins. ► Well-conceived developing world waste regulations lack enforceability. ► Crude e-waste processing cannot recover several rare materials. ► The amount of e-waste unsafely processed will continue to grow.

  8. Handling e-waste in developed and developing countries: Initiatives, practices, and consequences

    International Nuclear Information System (INIS)

    Sthiannopkao, Suthipong; Wong, Ming Hung

    2013-01-01

    Discarded electronic goods contain a range of toxic materials requiring special handling. Developed countries have conventions, directives, and laws to regulate their disposal, most based on extended producer responsibility. Manufacturers take back items collected by retailers and local governments for safe destruction or recovery of materials. Compliance, however, is difficult to assure, and frequently runs against economic incentives. The expense of proper disposal leads to the shipment of large amounts of e-waste to China, India, Pakistan, Nigeria, and other developing countries. Shipment is often through middlemen, and under tariff classifications that make quantities difficult to assess. There, despite the intents of national regulations and hazardous waste laws, most e-waste is treated as general refuse, or crudely processed, often by burning or acid baths, with recovery of only a few materials of value. As dioxins, furans, and heavy metals are released, harm to the environment, workers, and area residents is inevitable. The faster growth of e-waste generated in the developing than in the developed world presages continued expansion of a pervasive and inexpensive informal processing sector, efficient in its own way, but inherently hazard-ridden. - Highlights: ► Much e-waste, expensive to process safely, illegally goes to developing countries. ► E-waste processing in developing countries pollutes with heavy metals and dioxins. ► Well-conceived developing world waste regulations lack enforceability. ► Crude e-waste processing cannot recover several rare materials. ► The amount of e-waste unsafely processed will continue to grow

  9. E-waste management in India: A mini-review.

    Science.gov (United States)

    Awasthi, Abhishek Kumar; Wang, Mengmeng; Wang, Zhishi; Awasthi, Mrigendra Kumar; Li, Jinhui

    2018-05-01

    Environmental deterioration and health risk due to improper e-waste management has become a serious issue in India. The major portion of e-waste reaches an unorganized e-waste recycling sector and is then treated by using crude methods. This review article presents a brief highlight on e-waste management status, legislation, and technology uses in India. The present e-waste management needs to be more focused on environmentally sound management, by more active support from all the participants involved in the e-waste flow chain in India.

  10. Comparison of soil heavy metal pollution caused by e-waste recycling activities and traditional industrial operations.

    Science.gov (United States)

    He, Kailing; Sun, Zehang; Hu, Yuanan; Zeng, Xiangying; Yu, Zhiqiang; Cheng, Hefa

    2017-04-01

    The traditional industrial operations are well recognized as an important source of heavy metal pollution, while that caused by the e-waste recycling activities, which have sprouted in some developing countries, is often overlooked. This study was carried out to compare the status of soil heavy metal pollution caused by the traditional industrial operations and the e-waste recycling activities in the Pearl River Delta, and assess whether greater attention should be paid to control the pollution arising from e-waste recycling activities. Both the total contents and the chemical fractionation of major heavy metals (As, Cr, Cd, Ni, Pb, Cu, and Zn) in 50 surface soil samples collected from the e-waste recycling areas and 20 soil samples from the traditional industrial zones were determined. The results show that the soils in the e-waste recycling areas were mainly polluted by Cu, Zn, As, and Cd, while Cu, Zn, As, Cd, and Pb were the major heavy metals in the soils from the traditional industrial zones. Statistical analyses consistently show that Cu, Cd, Pb, and Zn in the surface soils from both types of sites were contributed mostly by human activities, while As, Cr, and Ni in the soils were dominated by natural background. No clear distinction was found on the pollution characteristic of heavy metals in the surface soils between the e-waste recycling areas and traditional industrial zones. The potential ecological risk posed by heavy metals in the surface soils from both types of sites, which was dominated by that from Cd, ranged from low to moderate. Given the much shorter development history of e-waste recycling and its largely unregulated nature, significant efforts should be made to crack down on illegal e-waste recycling and strengthen pollution control for related activities.

  11. Waste analysis plan for 222-S dangerous and mixed waste storage area

    International Nuclear Information System (INIS)

    Warwick, G.J.

    1994-01-01

    The 222-S Laboratory Complex, in the southeast corner of the 200 West Area, consists of the 222-S Laboratory, the 222-SA Standards Laboratory, and several ancillary facilities. Currently, 222-S Laboratory activities are in supporting efforts to characterize the waste stored in the 200 Areas single shell and double shell tanks. Besides this work, the laboratory also provides analytical services for waste-management processing plants, Tank Farms, B Plant, 242-A Evaporator Facility, Plutonium-Uranium Extraction Plant, Plutonium Finishing Plant, Uranium-Oxide Plant, Waste Encapsulation Storage Facility, environmental monitoring and surveillance programs, and activities involving essential materials and research and development. One part of the 222-SA Laboratory prepares nonradioactive standards for the 200 Area laboratories. The other section of the laboratory is used for cold (nonradioactive) process development work and standards preparation. The 219-S Waste Handling Facility has three storage tanks in which liquid acid waste from 222-S can be received, stored temporarily, and neutralized. From this facility, neutralized waste, containing radionuclides, is transferred to the Tank Farms. A 700-gallon sodium-hydroxide supply tank is also located in this facility. This plan provides the methods used to meet the acceptance criteria required by the 204-AR Waste Receiving Facility

  12. Radioactive waste management at the Paul Scherrer Institute, the largest Swiss national research centre

    Directory of Open Access Journals (Sweden)

    Beer Hans-Frieder

    2009-01-01

    Full Text Available This paper presents the current radioactive waste management practices at the Paul Scherrer Institute (PSI. The PSI contributes to waste related problems in two aspects, namely to the scientific basis of waste management and disposal, and to the practical treatment and storage of radioactive waste. In addition to the tasks of treating on-site generated waste, PSI manages the wastes from medicine, industry, and research throughout Switzerland on behalf of the government. Therefore the Dismantling and Waste Management Section is a part of the Logistics Department at PSI. Proved and accepted methods have to be developed for the safe conditioning and storage of radioactive waste. Various waste treatment facilities exist at PSI. The conditioning facility is dedicated to sorting, compaction by a 120 t press, solidification with special cement, and embedding in concrete. Specialized facilities were constructed for waste from the decommissioning of research reactors. Activated aluminum and its alloys were melted in crucibles and embedded in concrete in a concrete container. After dismantling the structural material of the reactors, it was embedded in concrete in the same manner. For the conditioning of activated reactor graphite, a dedicated method was developed. Graphite was crushed to replace sand in the grout, for embedding radioactive waste in concrete containers. For accelerator waste, a walk-in hot cell equipped with an electrically driven manipulator is available where the highly activated large components (targets, beam dump can be cut into pieces and embedded in concrete in containers. To guarantee the fulfillment of the demands of the regulators, the Dismantling and Waste Management Section applies an accredited quality management system for the safe collection, conditioning, and storage of radioactive waste.

  13. Dismantling and removal of the Niederaichbach nuclear power plant (KKN) to the 'Green Field'. Final report

    International Nuclear Information System (INIS)

    Valencia, L.; Prechtl, E.

    1998-04-01

    The major objective of the present project consisted in the complete dismantling and removal of the Niederaichbach nuclear power plant (KKN), ranging from the state of safe enclosure to re-establishing the original state of vegetation of the site (so-called 'green field'). By reaching this objective, principle feasibility of the complete removal of a power reactor was demonstrated. In addition, considerable experience has been gained with regard to the execution of all phases of such a complex project and project optimization. The following phases of the project can be distinguished: - Licensing procedure - dismantling of the inactive, contaminated and activated plant sections - disassembly of the activated building structures and decontamination of the buildings - demolition (conventional) of the buildings and recultivation of the site. Moreover, the project included the work performed under the direct supervision of the licensing authority, comprehensive radiation protection activities, the solution of waste management problems and the respective public relations work. (orig./MM) [de

  14. Health Risks Awareness of Electronic Waste Workers in the Informal Sector in Nigeria.

    Science.gov (United States)

    Ohajinwa, Chimere M; Van Bodegom, Peter M; Vijver, Martina G; Peijnenburg, Willie J G M

    2017-08-13

    Insight into the health risk awareness levels of e-waste workers is important as it may offer opportunities for better e-waste recycling management strategies to reduce the health effects of informal e-waste recycling. Therefore, this study assessed the knowledge, attitude, and practices associated with occupational health risk awareness of e-waste workers compared with a control group (butchers) in the informal sector in Nigeria. A cross-sectional study was used to assess health risk awareness of 279 e-waste workers (repairers and dismantlers) and 221 butchers from the informal sector in three locations in Nigeria in 2015. A questionnaire was used to obtain information on socio-demographic backgrounds, occupational history, knowledge, attitude, and work practices. The data was analysed using Analysis of Variance. The three job designations had significantly different knowledge, attitude, and practice mean scores ( p = 0.000), with butchers consistently having the highest mean scores. Only 43% of e-waste workers could mention one or more Personal Protective Equipment needed for their job compared with 70% of the butchers. The health risk awareness level of the e-waste workers was significantly lower compared with their counterparts in the same informal sector. A positive correlation existed between the workers' knowledge and their attitude and practice. Therefore, increasing the workers' knowledge may decrease risky practices.

  15. Data analysis on work activities in dismantling of Japan Power Demonstration Reactor (JPDR). Contract research

    International Nuclear Information System (INIS)

    Shiraishi, Kunio; Sukegawa, Takenori; Yanagihara, Satoshi

    1998-03-01

    The safe dismantling of a retired nuclear power plant was demonstrated by completion of dismantling activities for the Japan Power Demonstration Reactor (JPDR), March, 1996, which had been conducted since 1986. This project was a flag ship project for dismantling of nuclear power plants in Japan, aiming at demonstrating an applicability of developed dismantling techniques in actual dismantling work, developing database on work activities as well as dismantling of components and structures. Various data on dismantling activities were therefore systematically collected and these were accumulated on computer files to build the decommissioning database; dismantling activities were characterized by analyzing the data. The data analysis resulted in producing general forms such as unit activity factors, for example, manpower need per unit weight of component to be dismantled, and simple arithmetic forms for forecasting of project management data to be applied to planning another dismantling project through the evaluation for general use of the analyzed data. The results of data analysis could be usefully applied to planning of future decommissioning of commercial nuclear power plants in Japan. This report describes the data collection and analysis on the JPDR dismantling activities. (author)

  16. Comprehensive evaluation of dioxins and dioxin-like compounds in surface soils and river sediments from e-waste-processing sites in a village in northern Vietnam: Heading towards the environmentally sound management of e-waste

    Directory of Open Access Journals (Sweden)

    Go Suzuki

    2016-06-01

    Full Text Available The management of electronic waste (e-waste, which can be a source of both useful materials and toxic substances, depending on the processing method, is important for promoting material cycling. In this study, we used the dioxin-responsive chemical-activated luciferase gene expression (DR-CALUX assay combined with gas chromatography–high-resolution mass spectrometry to evaluate the levels of dioxin-like compounds in surface soils and river sediments collected in and around an e-waste-processing village in northern Vietnam. The WHO-TEQs (Toxic equivalents of polychlorinated dibenzo-p-dioxins and dibenzofurans (PCDD/Fs, coplanar polychlorinated biphenyls (Co-PCBs, and polybrominated dibenzo-p-dioxins and dibenzofurans (PBDD/Fs in soils collected in January 2012 ranged from 0.29 to 310 pg/g (median 2.9 pg/g, n = 32, and the WHO-TEQs in sediments ranged from 0.96 to 58 pg/g (median 4.4 pg/g, n = 8. Dioxin-like activities (CALUX-TEQs [2,3,7,8-TCDD equivalent] in soils collected in January 2012, 2013, and 2014 ranged from <30 to 4300 pg/g (median <30 pg/g, n = 96, and the activities in sediments ranged from <30 to 4000 pg/g (median 33 pg/g, n = 24. Dioxin-like compounds accumulated in samples collected around e-waste-processing areas such as open-burning sites and e-waste-processing workshops, and the compounds may be transported from their sources to surrounding areas over the course of several years. Some of the CALUX-TEQs, but not WHO-TEQs, values were higher than the maximum acceptable WHO-TEQs promulgated by various authorities, indicating that all dioxin-like compounds should be evaluated in samples collected from e-waste-processing areas. Our findings suggest that open burning and open storage of e-waste should be prohibited and that wastewater treatment should be implemented at each workshop to reduce contamination by dioxin-like compounds from e-waste.

  17. Analytical methodology for optimization of waste management scenarios in nuclear installation decommissioning process - 16148

    International Nuclear Information System (INIS)

    Zachar, Matej; Necas, Vladimir; Daniska, Vladimir; Rehak, Ivan; Vasko, Marek

    2009-01-01

    The nuclear installation decommissioning process is characterized by production of large amount of various radioactive and non-radioactive waste that has to be managed, taking into account its physical, chemical, toxic and radiological properties. Waste management is considered to be one of the key issues within the frame of the decommissioning process. During the decommissioning planning period, the scenarios covering possible routes of materials release into the environment and radioactive waste disposal, should be discussed and evaluated. Unconditional and conditional release to the environment, long-term storage at the nuclear site, near surface or deep geological disposal and relevant material management techniques for achieving the final status should be taken into account in the analysed scenarios. At the level of the final decommissioning plan, it is desirable to have the waste management scenario optimized for local specific facility conditions taking into account a national decommissioning background. The analytical methodology for the evaluation of decommissioning waste management scenarios, presented in the paper, is based on the materials and radioactivity flow modelling, which starts from waste generation activities like pre-dismantling decontamination, selected methods of dismantling, waste treatment and conditioning, up to materials release or conditioned radioactive waste disposal. The necessary input data for scenarios, e.g. nuclear installation inventory database (physical and radiological data), waste processing technologies parameters or material release and waste disposal limits, have to be considered. The analytical methodology principles are implemented into the standardised decommissioning parameters calculation code OMEGA, developed in the DECOM company. In the paper the examples of the methodology implementation for the scenarios optimization are presented and discussed. (authors)

  18. Mock-up-CZ: dismantling of the experiment - Geotechnical results

    International Nuclear Information System (INIS)

    Svoboda, J.; Vasicek, R.

    2010-01-01

    Document available in extended abstract form only. The issue of the disposal of radioactive waste is one of the most pressing challenges of our age, for which, in most countries, the deep repository concept is generally considered to be the most suitable final solution. In order to make such a repository both safe and reliable, intensive research is underway worldwide. The construction of physical models is one approach to the study of the engineered barriers for deep geological repositories; one such experiment, Mock-Up-CZ, has been performed at the Centre of Experimental Geotechnics, CTU in Prague. The Mock-Up-CZ experiment simulated the vertical placement of a container with radioactive waste, an approach that is in line with the Swedish KBS-3 system. The physical model consisted of a barrier made up of bentonite blocks, powdered bentonite backfill, a heater and hydration and monitoring systems. The whole experiment was enclosed in a cylindrical box, whose construction was able to withstand high pressure due to bentonite swelling. A number of sensors (monitoring changes in temperature, pressure and moisture) were placed inside the bentonite barrier. The basic material used in the experiment consisted of a mixture of Czech bentonite from the Rokle deposit (85%), quartz sand (10%) and graphite (5%). The first phase of the experiment commenced on 7 May 2002, during which the heater was switched on, with no water input. After 6 months the second phase commenced in which water was introduced through the hydration system. This phase ended on 2nd January 2006 when the heater was switched off. After allowing time for cooling, the dismantling phase commenced (30 January 2006). After a further one and a half months (17 March 2006) the dismantling of the experimental vessel was completed. Post-decommissioning analysis continued until the end of 2007. Dismantling and post-decommissioning analysis were carried out according to a very detailed plan which included not only

  19. Transparency in nuclear warhead dismantlement -- Limited chain of custody and warhead signatures

    International Nuclear Information System (INIS)

    Kiernan, G.; Percival, M.; Bratcher, L.

    1996-01-01

    The goal of the US Safeguards, Transparency, and Irreversibility (STI) initiative is the development of a series of transparency measures that provide confidence that nuclear warheads are actually being dismantled and that the fissile material being removed from these dismantled weapons is not recycled into new production. A limited chain of custody (LCC) would follow a warhead from the time it is declared excess until it is actually dismantled and the fissile materials are stored. Measurement of warhead signatures is an option in LCC using radiation detection techniques to confirm that a warhead has been dismantled, without intrusive inspections within the dismantlement facility. This paper discusses LCC and warhead signatures as well as indicate first results of laboratory measurements related to warhead signatures

  20. Setting UP a decontamination and dismantling (D and D) scenario - methodology and tools developed leopard

    International Nuclear Information System (INIS)

    Pradoura, F.

    2009-01-01

    At the AREVA NC La Hague site, the former nuclear spent fuel reprocessing plant UP2-400 was shutdown on December 30, 2003. Since then, the cleaning up and dismantling activities have been carried by the DV/PRO project, which is the program management organization settled by AREVA NC, for valorization projects. SGN, part of the AREVA NC Engineering Business Unit, operates as the main contractor of the DV/PRO project and provides project management services related to decommissioning and waste management. Hence, SGN is in charge of building D and D's scenarios for all the facilities of the UP2-400 plant, in compliance with safety, technical and financial requirements. Main outputs are logic diagrams, block flow diagrams, wastes and effluents throughputs. In order to meet with AREVA NC's requirements and expectations, SGN developed specific process and tools methods adapted to the scale and complexity of decommissioning a plant with several facilities, with different kind of processes (chemical, mechanical), some of which are in operation and other being dismantled. Considering the number of technical data and inputs to be managed, this methodology leads to complex outputs such as schedules, throughputs, work packages... The development, the maintenance and the modification of these outputs become more and more difficult with the complexity and the size of the plant considered. To cope with these issues, SGN CDE/DEM UP2-400 project team has developed a dedicated tool to assist and optimize in elaborating D and D scenarios. This tool is named LEOPARD (Logiciel d'Elaboration et d'Optimisation des Programmes d'Assainissement Radiologique et de Demantelement) (Software for the Development and Optimization of Radiological Clean up and Dismantling Programs). The availability of this tool allowed the rapid construction of a test case (demonstrator) that has convinced DV/PRO of its numerous advantages and of the future further development potentials. Presentations of LEOPARD

  1. Integrated Treatment and Storage Solutions for Solid Radioactive Waste at the Russian Shipyard Near Polyarny

    International Nuclear Information System (INIS)

    Griffith, A.; Engoy, T.; Endregard, M.; Busmundrud, O.; Schwab, P.; Nazarian, A.; Krumrine, P.; Backe, S.; Gorin, S.; Evans, B.

    2002-01-01

    Russian Navy Yard No. 10 (Shkval), near the city of Murmansk, has been designated as the recipient for Solid Radioactive Waste (SRW) pretreatment and storage facilities under the Arctic Military Environmental Cooperation (AMEC) Program. This shipyard serves the Northern Fleet by servicing, repairing, and dismantling naval vessels. Specifically, seven nuclear submarines of the first and second generation and Victor class are laid up at this shipyard, awaiting defueling and dismantlement. One first generation nuclear submarine has already been dismantled there, but recently progress on dismantlement has slowed because all the available storage space is full. SRW has been placed in metal storage containers, which have been moved outside of the actual storage site, which increases the environmental risks. AMEC is a cooperative effort between the Russian Federation, Kingdom of Norway and the United States. AMEC Projects 1.3 and 1.4 specifically address waste treatment and storage issues. Various waste treatment options have been assessed, technologies selected, and now integrated facilities are being designed and constructed to address these problems. Treatment technologies that are being designed and constructed include a mobile pretreatment facility comprising waste assay, segregation, size reduction, compaction and repackaging operations. Waste storage technologies include metal and concrete containers, and lightweight modular storage buildings. This paper focuses on the problems and challenges that are and will be faced at the Polyarninsky Shipyard. Specifically, discussion of the waste quantities, types, and conditions and various site considerations versus the various technologies that are to be employed will be provided. A systems approach at the site is being proposed by the Russian partners, therefore integration with other ongoing and planned operations at the site will also be discussed

  2. Development of Decontamination Technology for Separating Radioactive Constituents from Contaminated Concrete Waste

    International Nuclear Information System (INIS)

    Min, B. Y.; Kim, G. N.; Lee, G. W.; Choi, W. K.; Jung, U. S.

    2010-01-01

    The large amount of contaminated concrete produced during decommissioning procedures and available decontamination. In Korea, more than more than 60 tons of concrete wastes contaminated with uranium compounds have been generated from UCP (Uranium Conversion Plant) by dismantling. A recycling or a volume reduction of the concrete wastes through the application of appropriate treatment technologies have merits from the view point of an increase in a resource recycling as well as a decrease in the amount of wastes to be disposed of resulting in a reduction of a disposal cost and an enhancement of the disposal safety. For unconditional release of building and reduction of radioactive concrete waste, mechanical methods and thermal stress methods have been selected. In the advanced countries, such as France, Japan, Germany, Sweden, and Belgium, techniques for reduction and reuse of the decommissioning concrete wastes have applied to minimize the total radioactive concrete waste volume by thermal and mechanical processes. It was found that volume reduction of contaminated concrete can be achieved by separation of the fine cement stone and coarse gravel. Typically, the contaminated layer is only 1∼10mm thick because cementitious materials are porous media, the penetration of radionuclides may occur up to several centimenters from the surface of a material. Most of the dismantled concrete wastes are slightly contaminated rather than activated. This decontamination can be accomplished during the course of a separation of the concrete wastes contaminated with radioactive materials through a thermal treatment step of the radionuclide (e.g. cesium and strontium), transportation of the radionuclide to fine aggregates through a mechanical treatment step. Concrete is a structural material which generally consists of a binder (cement), water, and aggregate. The interaction between highly charged calcium silicate hydrate (C-S-H) particles in the presence of divalent calcium

  3. Chooz A: a model for the dismantling of water-cooled reactors

    International Nuclear Information System (INIS)

    Anon.

    2017-01-01

    The specificity of Chooz-A, the first French pressurized water reactor (PWR), is that the reactor and its major components (pumps, exchangers and cooling circuits) are installed in 2 caves dug out in a hill slope. Chooz-A was operating from 1967 to 1991, in 1993 the fuel was removed and in 2007 EDF received the authorization to dismantle the reactor. In 2012, EDF completed the dismantling of the cave containing the elements of the cooling circuit, a cornerstone was the removing of the four 14 m high steam generators. The dismantling of the pressure vessel began in march 2017, it is the same tools and the same processes that were used for the dismantling of the pressure vessel of the Zorita plant (Spain) in 2016. The end of the Chooz-A dismantling is expected in 2022. The feedback experience will help to standardize practices for the French fleet of PWRs. (A.C.)

  4. For a public management of funds dedicated to nuclear dismantling: the TESEN (fund for the Energy transition and a fair phasing out nuclear), and its assignment to the financing of energy transition

    International Nuclear Information System (INIS)

    Autissier, Isabelle; Germa, Philippe

    2013-01-01

    The report outlines that the cost of nuclear energy in France is largely under-assessed because of the under-evaluation of the future dismantling of nuclear installations and of the management of radioactive wastes. It outlines that provisions made for this dismantling are insufficient, opaque and very risky. This report proposes the creation of a fund independent from nuclear operators to make pay the actual cost of nuclear energy and reduce the French electrical dependence on this energy, to secure long-term financing to finance the dismantling, to bring the financing for the decades to come to finance energy transition, to finance energy transition at reasonable rates, and to clarify the governance for phasing out nuclear

  5. Shielded Cells D ampersand D and Dismantlement System Requirements

    International Nuclear Information System (INIS)

    Witherspoon, R.L.

    1995-01-01

    This document describes the basis for the development of the System for Highly Radioactive Equipment Dismantlement or SHRED. It is the result of a thorough investigation into current and past dismantlement practices at shielded cell facilities around the DOE complex. This information has been used to formulate the development requirements for the SHRED

  6. S.T.M.I.: Several years of experience in nuclear plant dismantling

    International Nuclear Information System (INIS)

    Moreau, J.C.

    1986-01-01

    Since 1977, when STMI performed its first dismantling operation, the Company appreciably improved in that field through important operations: the dismantling of the calciothermy and fluoration metal Pu preparation facility, in La Hague reprocessing plant, the dismantling of the slag treatment chain, associated to calciothermy and fluoration processes, in La Hague reprocessing plant, the cleaning of EL4 cell in Marcoule. To perform these operations, STMI's operating teams, on top of decontamination and dismantling technologies, strived to improve handling and transportation technologies, and to nuclearize many equipments. In order to increase its technical efficiency, STMI signed a cooperation agreement with TECHNICATOME company. Therefore, the union between the operational know-hows of STMI and the design experience of TECHNICATOME allow the needs of any customs facing a dismantling case to be satisfied [fr

  7. Low-level wastes pathways at EDF

    International Nuclear Information System (INIS)

    Hilmoine, R.; Casseau, L.Ph.

    1999-01-01

    First, what are, for EDF, the main issues dealing with the future management of low level wastes (LLW) will be recalled; and followed by a description of what are the implications of implementing these management principles: areas zoning, set up of pathways, traceability of the wastes and associated controls. The origin of the wastes will then be described using both qualitative and quantitative approaches; the description will specifically address the spreading of wastes production in time. LLW management at EDF will then be envisaged: storage in a specific discharge, pathways for treatment and elimination of wastes with acceptable radiological impact and costs. The example of LLW oils will be developed: particularly as far as hypothesis and results concerning the radiological impacts are concerned. The choice of incineration will then be justified, however expected difficulties to implement it industrially will be pointed out. Other on going studies and their main results will be mentioned: the present time is a turning point on that issue between thought and action; to be on going dismantling must take into account the emerging principles and give rise to good communication. (author)

  8. The Blue Lady Case and the International Issue of Ship Dismantling - Comment

    Directory of Open Access Journals (Sweden)

    Florent Pelsy

    2008-09-01

    Full Text Available This paper focuses on the decision of the Supreme Court of India to allow the dismantling of the Blue Lady (ex France in Alang. The first part underlines that the Supreme Court of India is prioritising the commercial interest of the dismantling companies over the social and environmental concerns of the workers and the communities living in Alang. It argues that such decision goes against its 2003 judgement on ship-dismantling. It then demonstrates that the Supreme Court of India is distorting the concept of sustainable development. The second part analyses the Blue Lady case from an international perspective since most of the ships that are dismantled in India come from developed countries. It provides an overview of the Basel Convention on ship dismantling issues and a study of the Clemenceau case before the French Conseil d'Etat. It then concludes that a better control of end-of-life ships in OECD countries and a new international convention on ship-dismantling would be necessary in order to prevent environmental and social disasters in Alang.

  9. Associations of neonatal lead, cadmium, chromium and nickel co-exposure with DNA oxidative damage in an electronic waste recycling town.

    Science.gov (United States)

    Ni, Wenqing; Huang, Yue; Wang, Xiaoling; Zhang, Jingwen; Wu, Kusheng

    2014-02-15

    This study aimed to evaluate the effects of toxic heavy metal co-exposure on DNA oxidative damage in neonates from a primitive e-waste recycling region, Guiyu town, China. Our participants included 201 pregnant women: 126 from Guiyu town and 75 from Jinping district of Shantou city, where no e-waste recycling and dismantling activities existed. Structured interview questionnaires were administered to the pregnant women and umbilical cord blood (UCB) samples were collected after delivery. The UCB concentrations of lead, cadmium, chromium, and nickel were analyzed by graphite furnace atomic absorption spectrometry (GFAAS). Levels of UCB plasma 8-hydroxydeoxyguanosine (8-OHdG, a DNA oxidative damage biomarker) were determined by enzyme-linked immunosorbent assay. Our results suggested that UCB lead and cadmium concentrations in neonates of Guiyu were significantly higher than those of Jinping (lead: median 110.45 ng/mL vs. 57.31 ng/mL; cadmium: median 2.50 ng/mL vs. 0.33 ng/mL, both Pnickel (β=0.215 ng/mL, 95% CI: 0.113 to 0.317 ng/mL) concentrations. The primitive e-waste recycling and dismantling activities may contribute to the elevated umbilical cord blood toxic heavy metal levels in neonates born in Guiyu. Exposures to cadmium, chromium and nickel were associated with increased oxidative DNA damage in neonates. Copyright © 2013 Elsevier B.V. All rights reserved.

  10. Decommissioning and dismantling of nuclear research facilities in Switzerland: lessons learned

    International Nuclear Information System (INIS)

    Leibundgut, Fritz

    2017-01-01

    Paul Scherrer Institute is the largest research institute for natural and engineering science in Switzerland. It operated various nuclear facilities from 1960 to 2011: Research reactors DIORIT, SAPHIR and PROTEUS, and an incineration plant for low and medium level radioactive waste. Concerning SAPHIR research reactor: in operation from 1958 to 1993, planning of decommissioning from 1998 to 2000. Decommissioning work started in 2004. Finishing is planned for 2019. Concerning DIORIT research reactor: operation as DIORIT I (20 MWth) from 1960 to 1967, then reconstruction to DIORIT II (30 MWth) and operation from 1970 until 1977. Planning of decommissioning from 1992 to 1994. Decommissioning work started in 1994 and was finished in 2012. Concerning PROTEUS research reactor: in operation from 1966 to 2011. Planning of decommissioning from 2013 to 2014. Starting of decommissioning work is planned for 2017, finishing is planned for the end of 2018 Incineration plant: In operation from 1974 to 2002. Planning of decommissioning from 2011 to 2012. Starting of decommissioning work in 2016. Finishing planned for end of 2019. Treatment of various material categories from dismantling: Concerning aluminum: because of the production of H_2 during solidification in concrete, it was necessary to minimize the surface area. When dismantling research reactors, the aluminum removed was melted in an induction furnace and poured into a 4.5 m"3 concrete container to solidify. Cutting the metal and handling it was largely accomplished remote control, using conventional technology. Concerning Steel/Cast-iron: the storage containers to be filled determined the method used for reducing the size of these materials, and the technique used for handling them. The goal was to optimize the packing density to reduce repository costs. The selected method of reducing the size of components is to cut them up using diamond-tipped tools, like saw blades. Concerning Graphite: for graphite, grinding was the

  11. Dismantling of JPDR begins: to demonstrate advanced technology

    Energy Technology Data Exchange (ETDEWEB)

    1986-12-01

    The first dismantling of the Japan Power Demonstration Reactor (JPDR, BWR, 90 MWt, 12.5 MWe) began on December 4, 1986, claiming the attention of nuclear interests in Japan and overseas. The Japan Atomic Energy Research Institute undertook the project as the second phase of the six year program for dismantling the JPDR at the Tokai Research Establishment. It is the demonstration of the technology developed in the first phase of the program from 1981 to 1986, aiming at establishing a total system for dismantling commercial nuclear power plants in the furture. At the ceremony for the beginning of dismantling held on December 4 at the site, a special switch was operated to fire a gas burner, and cutting of the upper head of the reactor pressure vessel on the service floor of the reactor building began. The long term program on the development and utilization of nuclear energy in 1982 decided the basic policy on reactor decommissioning. Under this policy, in July, 1984, the nuclear subcommittee of the Advisory Committee for Energy set up the guideline for standardized decommissioning suitable to the actual situation in Japan. The schedule of the program, the development of eight fundamental techniques, disassembling techniques, decontamination, measurement and robotics are described. (Kako, I.).

  12. Development of project management data calculation models relating to dismantling of nuclear facilities. Contract research

    Energy Technology Data Exchange (ETDEWEB)

    Sukegawa, Takenori; Ohshima, Soichiro; Shiraishi, Kunio; Yanagihara, Satoshi [Department of Decommissioning and Waste Management, Tokai Research Establishment, Japan Atomic Energy Research Institute, Tokai Ibaraki (Japan)

    1999-02-01

    Labor-hours necessary for dismantling activities are generally estimated based on experience, for example, as a form of unit productivity factors such as the relationship between labor-hours and weight of components dismantled which were obtained by actual dismantling activities. The project management data calculation models together with unit productivity factors for basic dismantling work activities were developed by analyzing the data obtained from the Japan Power Demonstration Reactor (JPDR) dismantling project, which will be applicable to estimation of labor-hours in various dismantling conditions. Typical work breakdown structures were also prepared by categorizing repeatable basic dismantling work activities for effective planning of dismantling activities. The labor-hours for dismantling the JPDR components and structures were calculated by using the code system for management of reactor decommissioning (COSMARD), in which the work breakdown structures and the calculation models were contained. It was confirmed that the labor-hours could be easily estimated by COSMARD through the calculations. This report describes the labor-hour calculation models and application of these models to COSMARD. (author)

  13. Issues on a tritium measurement system's qualification on a dismantling site

    Energy Technology Data Exchange (ETDEWEB)

    Pigeon, Benoit; Met, Frederic [Waste Treatment and Nuclear Safety Service - SASN, Waste and Measurement Laboratory - LDM, CEA/SASN/LDM, DAM, DIF, Bruyeres Le Chatel, F-91297 Arpajon (France)

    2015-07-01

    In order to choose the suitable outlet, final disposal of radioactive package requires good knowledge of radiological characteristics of the waste. As part of a nuclear facility's dismantling within tritium proceeds, {sup 3}H contamination is evaluated by using wipe tests which are measured by liquid scintillation. The industrialist's choice is a triple coincidence to double coincidence ratio (TDCR) method with a dry counting protocol. The initial protocol had been defined to reduce the quantity of radioactive liquid waste and to perform an automatic quenching correction. A based on TDCR method liquid scintillation analyser was installed on the decommissioning site. It had had to be used by operator non specialized in metrology, This poster presents the laboratory's feedback on the use of the TDCR method on a site: - problems encountered about protocol on a decommissioning site - protocol adjustments and their consequences. (authors)

  14. Declassification of radioactive water from a pool type reactor after nuclear facility dismantling

    Science.gov (United States)

    Arnal, J. M.; Sancho, M.; García-Fayos, B.; Verdú, G.; Serrano, C.; Ruiz-Martínez, J. T.

    2017-09-01

    This work is aimed to the treatment of the radioactive water from a dismantled nuclear facility with an experimental pool type reactor. The main objective of the treatment is to declassify the maximum volume of water and thus decrease the volume of radioactive liquid waste to be managed. In a preliminary stage, simulation of treatment by the combination of reverse osmosis (RO) and evaporation have been performed. Predicted results showed that the combination of membrane and evaporation technologies would result in a volume reduction factor higher than 600. The estimated time to complete the treatment was around 650 h (25-30 days). For different economical and organizational reasons which are explained in this paper, the final treatment of the real waste had to be reduced and only evaporation was applied. The volume reduction factor achieved in the real treatment was around 170, and the time spent for treatment was 194 days.

  15. Solid Waste Management in Recreational Forest Areas.

    Science.gov (United States)

    Spooner, Charles S.

    The Forest Service, U. S. Department of Agriculture, requested the Bureau of Solid Waste Management to conduct a study of National Forest recreation areas to establish waste generation rates for major recreation activities and to determine the cost of solid waste handling for selected Forest Service Districts. This report describes the 1968 solid…

  16. Associations of neonatal lead, cadmium, chromium and nickel co-exposure with DNA oxidative damage in an electronic waste recycling town

    International Nuclear Information System (INIS)

    Ni, Wenqing; Huang, Yue; Wang, Xiaoling; Zhang, Jingwen; Wu, Kusheng

    2014-01-01

    Objective: This study aimed to evaluate the effects of toxic heavy metal co-exposure on DNA oxidative damage in neonates from a primitive e-waste recycling region, Guiyu town, China. Methods: Our participants included 201 pregnant women: 126 from Guiyu town and 75 from Jinping district of Shantou city, where no e-waste recycling and dismantling activities existed. Structured interview questionnaires were administered to the pregnant women and umbilical cord blood (UCB) samples were collected after delivery. The UCB concentrations of lead, cadmium, chromium, and nickel were analyzed by graphite furnace atomic absorption spectrometry (GFAAS). Levels of UCB plasma 8-hydroxydeoxyguanosine (8-OHdG, a DNA oxidative damage biomarker) were determined by enzyme-linked immunosorbent assay. Results: Our results suggested that UCB lead and cadmium concentrations in neonates of Guiyu were significantly higher than those of Jinping (lead: median 110.45 ng/mL vs. 57.31 ng/mL; cadmium: median 2.50 ng/mL vs. 0.33 ng/mL, both P < 0.001). Parents' residence in Guiyu, and parents' work related to e-waste recycling were the risk factors associated with neonate's UCB lead and cadmium levels. No significant difference of UCB plasma 8-OHdG levels was found between Guiyu and the control area. After adjusting for potential confounders, cord plasma 8-OHdG concentrations (ng/mL) were positively associated with blood cadmium (β = 0.126 ng/mL, 95% CI: 0.055 to 0.198 ng/mL), chromium (β = 0.086 ng/mL, 95% CI: 0.014 to 0.158 ng/mL) and nickel (β = 0.215 ng/mL, 95% CI: 0.113 to 0.317 ng/mL) concentrations. Conclusions: The primitive e-waste recycling and dismantling activities may contribute to the elevated umbilical cord blood toxic heavy metal levels in neonates born in Guiyu. Exposures to cadmium, chromium and nickel were associated with increased oxidative DNA damage in neonates. - Highlights: • DNA oxidative damage levels (8-OHdG) in neonates from Guiyu were assessed. • Neonatal lead

  17. Associations of neonatal lead, cadmium, chromium and nickel co-exposure with DNA oxidative damage in an electronic waste recycling town

    Energy Technology Data Exchange (ETDEWEB)

    Ni, Wenqing; Huang, Yue; Wang, Xiaoling; Zhang, Jingwen; Wu, Kusheng, E-mail: kswu@stu.edu.cn

    2014-02-01

    Objective: This study aimed to evaluate the effects of toxic heavy metal co-exposure on DNA oxidative damage in neonates from a primitive e-waste recycling region, Guiyu town, China. Methods: Our participants included 201 pregnant women: 126 from Guiyu town and 75 from Jinping district of Shantou city, where no e-waste recycling and dismantling activities existed. Structured interview questionnaires were administered to the pregnant women and umbilical cord blood (UCB) samples were collected after delivery. The UCB concentrations of lead, cadmium, chromium, and nickel were analyzed by graphite furnace atomic absorption spectrometry (GFAAS). Levels of UCB plasma 8-hydroxydeoxyguanosine (8-OHdG, a DNA oxidative damage biomarker) were determined by enzyme-linked immunosorbent assay. Results: Our results suggested that UCB lead and cadmium concentrations in neonates of Guiyu were significantly higher than those of Jinping (lead: median 110.45 ng/mL vs. 57.31 ng/mL; cadmium: median 2.50 ng/mL vs. 0.33 ng/mL, both P < 0.001). Parents' residence in Guiyu, and parents' work related to e-waste recycling were the risk factors associated with neonate's UCB lead and cadmium levels. No significant difference of UCB plasma 8-OHdG levels was found between Guiyu and the control area. After adjusting for potential confounders, cord plasma 8-OHdG concentrations (ng/mL) were positively associated with blood cadmium (β = 0.126 ng/mL, 95% CI: 0.055 to 0.198 ng/mL), chromium (β = 0.086 ng/mL, 95% CI: 0.014 to 0.158 ng/mL) and nickel (β = 0.215 ng/mL, 95% CI: 0.113 to 0.317 ng/mL) concentrations. Conclusions: The primitive e-waste recycling and dismantling activities may contribute to the elevated umbilical cord blood toxic heavy metal levels in neonates born in Guiyu. Exposures to cadmium, chromium and nickel were associated with increased oxidative DNA damage in neonates. - Highlights: • DNA oxidative damage levels (8-OHdG) in neonates from Guiyu were assessed.

  18. Experience of partial dismantling and large component removal of light water reactors

    International Nuclear Information System (INIS)

    Dubourg, M.

    1987-01-01

    Not any of the French PWR reactors need to be decommissioned before the next decade or early 2000. However, feasibility studies of decommissioning have been undertaken and several dismantling scenarios have been considered including the dismantling of four PWR units and the on-site entombment of the active components into a reactor building for interim disposal. In addition to theoretical evaluation of radwaste volume and activity, several operations of partial dismantling of active components and decontamination activities have been conducted in view of dismantling for both PWR and BWR units. By analyzing the concept of both 900 and 1300 MWe PWR's, it appears that the design improvements taken into account for reducing occupational dose exposure of maintenance personnel and the development of automated tools for performing maintenance and repairs of major components, contribute to facilitate future dismantling and decommissioning operations

  19. E-waste: Environmental Problems and Current Management

    Directory of Open Access Journals (Sweden)

    D. Aktsoglou

    2010-01-01

    Full Text Available In this paper the environmental problems related with the discarded electronic appliances, known as e-waste, are reviewed.Moreover, the current and the future production of e-waste, the potential environmental problems associated with theirdisposal and management practices are discussed whereas the existing e-waste management schemes in Greece and othercountries (Japan, Switzerland are also quoted.

  20. Knowledge and Awareness Implication on E-Waste Management ...

    African Journals Online (AJOL)

    Knowledge and Awareness Implication on E-Waste Management among ... and Awareness Implication on E-Waste Management among Nigerian Collegiate ... with e-waste may pose potential threat to human health and the environment.

  1. Economic analysis of e-waste market under imperfect information

    OpenAIRE

    Prudence Dato

    2015-01-01

    Despite international regulations that prohibit the trans-boundary movement of electronic and electric waste (e-waste), non-reusable e-waste is often illegally mixed with reusable e-waste and results in being sent to developing countries. As developing countries are not well prepared to properly manage e-waste, this illegal trade has important negative externalities, and creates ‘environmental injustice’. The two main information problems on the e-waste market are imperfect monitoring and imp...

  2. Evaluation of municipal solid waste management in egyptian rural areas.

    Science.gov (United States)

    El-Messery, Mamdouh A; Ismail, Gaber A; Arafa, Anwaar K

    2009-01-01

    A two years study was conducted to evaluate the solid waste management system in 143 villages representing the Egyptian rural areas. The study covers the legal responsibilities, service availability, environmental impacts, service providers, financial resources, private sector participation and the quality of collection services. According to UN reports more than 55% of Egyptian population lives in rural areas. A drastic change in the consumption pattern altered the quantity and quality of the generated solid wastes from these areas. Poor solid waste management systems are stigmata in most of the Egyptian rural areas. This causes several environmental and health problems. It has been found that solid waste collection services cover only 27% of the surveyed villages, while, the statistics show that 75% of the surveyed villages are formally covered. The service providers are local villager units, private contractors and civil community associations with a percentage share 71%, 24% and 5% respectively. The operated services among these sectors were 25%, 71% and 100% respectively. The share of private sector in solid waste management in rural areas is still very limited as a result of the poverty of these communities and the lack of recyclable materials in their solid waste. It has been found that direct throwing of solid waste on the banks of drains and canals as well as open dumping and uncontrolled burning of solid waste are the common practice in most of the Egyptian rural areas. The available land for landfill is not enough, pitiable designed, defectively constructed and unreliably operated. Although solid waste generated in rural areas has high organic contents, no composting plant was installed. Shortage in financial resources allocated for valorization of solid waste management in the Egyptian rural areas and lower collection fees are the main points of weakness which resulted in poor solid waste management systems. On the other hand, the farmer's participation

  3. Development of Digital Mock-Up for the Assessment of Dismantling Scenarios

    International Nuclear Information System (INIS)

    Kim, Sung-Kyun; Park, Hee-Sung; Lee, Kune-Woo; Jung, Chong-Hun

    2008-01-01

    As the number of superannuated research reactors and nuclear power plants increase, dismantling nuclear power facilities has become a big issue. However, decommissioning a nuclear facility is still a costly and possibly hazardous task. So prior to an actual decommission, what should be done foremost is to establish a proper procedure. Due to the fact that a significant difference in cost, exposure to a radiation, and safety might occur, a proper procedure is imperative for the entire engineering process. The purpose of this paper is to develop a system for evaluating the decommissioning scenarios logically and systematically. So a digital mockup system with functions such as a dismantling schedule, decommissioning costs, wastes, worker's exposure dose, and a radiation distribution was developed. Also on the basis of the quantitative information calculated from a DMU system and the data evaluated by decommissioning experts about qualitatively evaluating the items, the best decommissioning scenarios were established by using the analytic hierarchy process (AHP) method. Finally, the DMU was implemented in the thermal column of KRR-1 and adequate scenarios were provided after comparing and analyzing the two scenarios. In this paper, we developed the virtual environment of KRR-1 by using computer graphic technology and simulating the dismantling processes. The data-computing modules were also developed for quantitatively comparing the decommissioning scenarios. The decommissioning DMU system was integrated with both the VE system and the data-computing modules. In addition, we presented a decision-making method for selecting the best decommissioning scenario through the AHP. So the scenarios can be evaluated logically and quantitatively through the decommissioning DMU. As an implementation of the AHP, the plasma cutting scenario and the nibbler cutting scenario of the thermal column were prioritized. The fact that the plasma cutting scenario ranked the better than the

  4. Use of scalp hair as indicator of human exposure to heavy metals in an electronic waste recycling area

    International Nuclear Information System (INIS)

    Wang Thanh; Fu Jianjie; Wang Yawei; Liao Chunyang; Tao Yongqing; Jiang Guibin

    2009-01-01

    Scalp hair samples were collected at an electronic waste (e-waste) recycling area and analyzed for trace elements and heavy metals. Elevated levels were found for Cu and Pb with geometric means (GMs) at 39.8 and 49.5 μg/g, and the levels of all elements were found in the rank order Pb > Cu >> Mn > Ba > Cr > Ni > Cd > As > V. Besides Cu and Pb, Cd (GM: 0.518 μg/g) was also found to be significantly higher compared to that in hair samples from control areas. Differences with age, gender, residence status and villages could be distinguished for most of the elements. The high levels of Cd, Cu and Pb were likely found to be originated from e-waste related activities, and specific sources were discussed. This study shows that human scalp hair could be a useful biomarker to assess the extent of heavy metal exposure to workers and residents in areas with intensive e-waste recycling activities. - Human scalp hair samples can be used to indicate environmental and occupational exposure of heavy metals due to intensive electronic waste recycling activities.

  5. Radioactive waste: the poisoned legacy of the nuclear industry

    International Nuclear Information System (INIS)

    Rousselet, Y.

    2011-01-01

    The nuclear industry produces a huge amount of radioactive waste from one end to the other of the nuclear cycle: i.e. from mining uranium to uranium enrichment through reactor operating, waste reprocessing and dismantling nuclear power plants. Nuclear power is now being 'sold' to political leaders and citizens as an effective way to deal with climate change and ensure security of energy supplies. Nonetheless, nuclear energy is not a viable solution and is thus a major obstacle to the development of clean energy for the future. In addition to safety and security issues, the nuclear industry is, above all, faced with the huge problem of how to deal with the waste it produces and for which it has no solution. This ought to put a brake on the nuclear industry, but instead, against all expectations, its development continues to gather pace. (author)

  6. Development of multi-functional telerobotic systems for reactor dismantlement

    International Nuclear Information System (INIS)

    Fujii, Yoshio; Usui, Hozumi; Shinohara, Yoshikuni

    1992-01-01

    This report summarizes technological features of advanced telerobotic systems for reactor dismantling application developed at the Japan Atomic Energy Research Institute. Taking into consideration the special environmental conditions in reactor dismantling, major effort was made to develop multifunctional telerobotic system of high reliability which can be used to perform various complex tasks in an unstructured environment and operated in an easy and flexible manner. The system development was carried out through constructing three systems in seccession; a light-duty and a heavy-duty system as a prototype system for engineering test in cold environment, and a demonstration system for practical on-site application to dismantling highly radioactive reactor internals of an experimental boiling water reactor JPDR (Japan Power Demonstration Reactor). Each system was equipped with one or two amphibious manipulators which can be operated in either a push-button manual, a bilateral master-slave, a teach-and-playback or a programmed control mode. Different scheme was adopted in each system at designing the manipulator, transporter and man-machine interface so as to compare their advantages and disadvantages. According to the JPDR decommissioning program, the demonstration system was successfully operated to dismantle a portion of the radioactive reactor internals of the JPDR, which used underwater plasma arc cutting method and proved the usefulness of the multi-functional telerobotic system for reducing the occupational hazards and enhancing the work efficiency in the course of dismantling highly radioactive reactor components. (author)

  7. Characterization of Discharge Areas of Radionuclides Originating From Nuclear Waste Repositories

    Science.gov (United States)

    Marklund, L.; Xu, S.; Worman, A.

    2009-05-01

    If leakages in nuclear waste repositories located in crystalline bedrock arise, radionuclides will reach the biosphere and cause a risk of radiological impact. The extent of the radiological impact depends on in which landscape elements the radionuclides emerge. In this study, we investigate if there are certain landscape elements that generally will act as discharge areas for radionuclides leaking from subsurface deposits. We also characterize the typical properties that distinguish these areas from others. In humid regions, landscape topography is the most important driving force for groundwater flow. Because groundwater is the main transporting agent for migrating radionuclides, the topography will determine the flowpaths of leaking radionuclides. How topography and heterogeneities in the subsurface affect the discharge distribution of the radionuclides is therefore an important scope of this study. To address these issues, we developed a 3-D transport model. Our analyses are based on site-specific data from two different areas in Sweden, Forsmark, Uppland, and Oskarshamn, Småland. The Swedish Nuclear Waste Management Company (SKB) has selected these two areas as candidate areas for a deep repository of nuclear waste and the areas are currently subject to site investigations. Our results suggest that there are hot-spots in the landscape i.e. areas with high probability of receiving large amounts of radionuclides from a leaking repository of nuclear waste. The hot-spots concentrate in the sea, streams, lakes and wetlands. All these elements are found at lower elevations in the landscape. This pattern is mostly determined by the landscape topography and the locations of fracture zones. There is a relationship between fracture zones and topography, and therefore the importance of the topography for the discharge area distribution is not contradicted by the heterogeneity in the bedrock. The varieties of landscape elements which have potential for receiving

  8. Safety of laboratories, plants, facilities being dismantled, waste processing, interim storage and disposal facilities. Lessons learned from events reported in 2009 and 2010

    International Nuclear Information System (INIS)

    2013-01-01

    This report presents the cross-disciplinary analysis performed by IRSN relating to significant events reported to the French Nuclear Safety Authority (ASN) during 2009 - 2010 for LUDD-type facilities (laboratories, plants, facilities being dismantled, and waste processing, interim storage and disposal facilities). It constitutes a follow-up to DSU Report 215 published in December 2009, relating to events reported to ASN during 2005 to 2008. The main developments observed since the analysis presented in that report have been underlined here, in order to highlight improvements, opportunities for progress and the main areas requiring careful attention. The present report is a continuation of DSU Report 215. Without claiming to be exhaustive, it presents lessons from IRSN's cross-disciplinary analysis of events reported to ASN during 2009 and 2010 at LUDD facilities while highlighting major changes from the previous analysis in order to underline improvements, areas where progress has been made, and main points for monitoring. The report has four sections: - the first gives a brief introduction to the various kinds of LUDD facilities and highlights changes with DSU Report 215; - the second provides a summary of major trends involving events reported to ASN during 2007-2010 as well as overall results of consequences of events reported during 2009 and 2010 for workers, the general public and the environment; - the third section gives a cross-disciplinary analysis of significant events reported during 2009 and 2010, performed from two complementary angles (analysis of main types of events grouped by type of risk and analysis of generic causes). Main changes from the analysis given in DSU Report 215 are considered in detail; - the last section describes selected significant events that occurred in 2009 and 2010 in order to illustrate the cross-disciplinary analysis with concrete examples. IRSN will publish this type of report periodically in coming years in order to

  9. The flow of E-waste material in the Asian region and a reconsideration of international trade policies on E-waste

    International Nuclear Information System (INIS)

    Shinkuma, Takayoshi; Nguyen Thi Minh Huong

    2009-01-01

    End-of-life home appliances discarded in Japan are reused in Southeast Asia; end-of-life computers are reused in China. E-waste scrap generated in Asia is recycled in China, especially in Guangdong Province. The informal sector in that province has been recycling E-waste scrap and its improper recycling methods have caused serious pollution. In response to this problem, there is wide support for a total ban on E-waste trade, including secondhand items and E-waste scrap. Alternatively, we recommend the establishment of an alternative proper recycling system in Asia that needs cooperation among all Asian countries. First, China is urged to promote proper domestic recycling activities by providing a subsidy for proper recycling. Second, Japan, as a main exporter of E-waste, should establish a traceability system that ensures E-waste scrap exported from Japan will be recycled at proper recycling facilities in China

  10. Relationship between e-waste recycling and human health risk in India: a critical review.

    Science.gov (United States)

    Awasthi, Abhishek Kumar; Zeng, Xianlai; Li, Jinhui

    2016-06-01

    Informal recycling of waste (including e-waste) is an emerging source of environmental pollution in India. Polychlorinated biphenyls (PCBs), polychlorinated diphenyl ethers (PBDEs), and heavy metals, among other substances, are a major health concern for workers engaged in waste disposal and processing, and for residents living near these facilities, and are also a detriment to the natural environment. The main objective of this review article was to evaluate the status of these impacts. The review found that, huge quantity of e-waste/waste generated, only a small amount is treated formally; the remainder is processed through the informal sector. We also evaluated the exposure pathways, both direct and indirect, and the human body load markers (e.g., serum, blood, breast milk, urine, and hair), and assessed the evidence for the association between these markers and e-waste exposure. Our results indicated that the open dumping and informal e-waste recycling systems should be replaced by the best available technology and environmental practices, with proper monitoring and regular awareness programs for workers and residents. Further and more detailed investigation in this area is also recommended.

  11. E-waste: A Challenge for Sustainable Development

    Directory of Open Access Journals (Sweden)

    Md. Sahadat Hossain

    2015-01-01

    Conclusions. Sustainability is being prioritized for all development activities by integrating societal, economic, environmental, technological, cultural, and gender perspectives. Considering the adverse potential eco-toxicological impacts and diverse health effects of e-waste, an urgent global multilateral agreement is needed addressing its management (i.e., handling, storage, transportation, recycling, and final disposal, whether by land filling or incineration. Due to the global nature of the issue and the difficulty of establishing sustainable and environmentally sound processing of e-waste in low-income countries, multinational negotiation and collaboration is the only realistic solution. Furthermore, comprehensive global e-waste management and policies could help to off-set the hazards of e-waste and are the best approach for achieving sustainable development.

  12. Parameters of Dismantling Techniques Related to Costs for Decommissioning of Nuclear Facilities

    International Nuclear Information System (INIS)

    Jeong, Kwanseong; Moon, Jeikwon; Choi, Byungseon

    2012-01-01

    Reliable cost estimating is one of the most important elements of decommissioning operation. Reliable cost estimating is one of the most important elements of decommissioning planning. Alternative technologies may be evaluated and compared on their efficiency and effectiveness, and measured against a baseline cost as to the feasibility and benefit derived from the technology. This principle ensures that the cost consideration is economically sound and practical for funding. This paper provides a list with basic review of cutting and dismantling techniques, including some typical characteristics if available, as well as aspects of implementation, parameters of cutting and dismantling techniques in decommissioning costing. This paper gives an overview of the principles of the unit factor approach and its implementation in costing in relation to dismantling activities. In general, proper evaluation of decommissioning costs is important for following issues and relevant measures for achieving the listed aspects are: · Selection of a decommissioning strategy and activities: several decommissioning options should be evaluated: · Support to a cost-benefit analysis to ensure that the principle of optimization and reasonably practicable measures are applied: the extent of evaluated decommissioning options should cover all possible scenarios for dismantling activities; · Estimate of required financial resources for the selected strategy: the selected option should involve the dismantling activities in a structure and extent relevant to real procedure of dismantling activities; · Preparation of the project schedule, workforce requirements and phased funding needs: dismantling activities should be structured according to the tasks of the decommissioning schedule; · Definition of measures for proper management and maintenance of resources for safe and timely decommissioning: the time distribution and safety related parameters of dismantling activities should be known

  13. Recovery and recycling of aluminum, copper, and precious metals from dismantled weapon components

    International Nuclear Information System (INIS)

    Gundiler, I.H.; Lutz, J.D.; Wheelis, W.T.

    1994-01-01

    Sandia National Laboratories (SNL) is tasked to support The Department of Energy in the dismantlement and disposal of SNL designed weapon components. These components are sealed in a potting compound, and contain heavy metals, explosive, radioactive, and toxic materials. SNL developed a process to identify and remove the hazardous sub-components utilizing real-time radiography and abrasive water-jet cutting. The components were then crushed, granulated, screened, and separated into an aluminum and a precious-and-base-metals fraction using air-tables. Plastics were further cleaned for disposal as non-hazardous waste. New Mexico Bureau of Mines and Mineral Resources assisted SNL in investigation of size-reduction and separation technologies

  14. Evaluation of worker's dose on a virtual dismantling environment

    International Nuclear Information System (INIS)

    Park, Hee Seong; Kim, Sung Hyun; Park, Byung Suk; Yoon, Ji Sup

    2007-01-01

    The motivation of this study is to provide a basis for a minimization of worker's dose during dismantling activities. In the present study, we proposed methods for identifying an existence of radioactivity which is contained in the dismantling objects and for evaluating a worker's dose under a virtual dismantling environment. To evaluate a worker's external dose, the shape of the exposure room in the KRR 2(Korean Research Reactor TRIGA MARK III) by 3D CAD was created and the radiation dose surrounding the facility by using MCNP- 4C(Monte Carlo N-Particle-4C) was calculated. The radiation field of the exposure room was visualized three dimensionally by using the radiation dose that was obtained by the code

  15. Development of telerobotic manipulators for reactor dismantling work

    International Nuclear Information System (INIS)

    Shinohara, Yoshikuni; Usui, Hozumi; Fujii, Yoshio

    1991-01-01

    This paper describes the amphibious electrical manipulators JARM-10, JART-25, JART-100 and JARM-25 which were developed in the program of reactor decommissioning technology development carried out by the Japan Atomic Energy Research Institute. They are multi-functional telerobotic light-duty (10 and 25 daN) and heavy-duty (100 daN) Manipulators which can be used in hostile environments in reactor dismantling work such as high radiation, underwater work and electrical noise. Each manipulator can be operated in either a bilateral master-slave, a teach-and-playback or a programmed control mode. By combining these modes appropriately, it is possible to perform complex tasks of remote handling. The usefulness of the telerobotic systems for dismantling nuclear reactors has been demonstrated by successful application of the JARM-25 for remote underwater dismantlement of highly radioactive reactor internals of complex form of an experimental nuclear power reactor. (author)

  16. Short-chain chlorinated paraffins in terrestrial bird species inhabiting an e-waste recycling site in South China

    International Nuclear Information System (INIS)

    Luo, Xiao-Jun; Sun, Yu-Xin; Wu, Jiang-Ping; Chen, She-Jun; Mai, Bi-Xian

    2015-01-01

    Short-chain chlorinated paraffins (SCCPs) are under review by the Stockholm Convention on Persistent Organic Pollutants. Currently, limited data are available about SCCPs in terrestrial organisms. In the present study, SCCP concentration in the muscles of seven terrestrial bird species (n = 38) inhabiting an e-waste recycling area in South China was determined. This concentration varied from 620 to 17,000 ng/g lipid. Resident birds accumulated significantly higher SCCP concentrations than migratory birds (p < 0.01). Trophic magnification was observed for migratory bird species but not for resident, which was attributed to high heterogeneity of SCCP in e-waste area. Two different homologue group patterns were observed in avian samples. The first pattern was found in five bird species dominated by C 10 and C 11 congeners, while the second was found in the remains, which show rather equal abundance of homologue groups. This may be caused by two sources of SCCPs (local and e-waste) in the study area. - Highlights: • SCCPs in terrestrial bird species from an e-waste area are first reported. • Elevated SCCP level was found as compared with other regions. • Resident birds accumulated significantly higher SCCP levels than migratory birds. • Trophic magnification was observed for migratory but not for resident bird species. • Two homologue patterns were found among seven bird species. - SCCP concentration in terrestrial bird species inhabiting an e-waste site was first reported in this study

  17. Annual report 1999. Department of wastes disposal and storage

    International Nuclear Information System (INIS)

    2000-01-01

    This annual report presents the organization, the personnel, the collaborations, the scientific researches and the publications of the Department of wastes disposal and storage of the CEA. A thematic presentation of the research and development programs is provided bringing information on the liquid effluents processing, the materials and solid wastes processing, the wastes conditioning, the characterization, the storage, the radionuclides chemistry and migration, the dismantling and the environment. (A.L.B.)

  18. Elevated biomarkers of sympatho-adrenomedullary activity linked to e-waste air pollutant exposure in preschool children.

    Science.gov (United States)

    Cong, Xiaowei; Xu, Xijin; Xu, Long; Li, Minghui; Xu, Cheng; Qin, Qilin; Huo, Xia

    2018-06-01

    Air pollution is a risk factor for cardiovascular disease (CVD), and cardiovascular regulatory changes in childhood contribute to the development and progression of cardiovascular events at older ages. The aim of the study was to investigate the effect of air pollutant exposure on the child sympatho-adrenomedullary (SAM) system, which plays a vital role in regulating and controlling the cardiovascular system. Two plasma biomarkers (plasma epinephrine and norepinephrine) of SAM activity and heart rate were measured in preschool children (n = 228) living in Guiyu, and native (n = 104) and non-native children (n = 91) living in a reference area (Haojiang) for >1 year. Air pollution data, over the 4-months before the health examination, was also collected. Environmental PM 2.5 , PM 10 , SO 2 , NO 2 and CO, plasma norepinephrine and heart rate of the e-waste recycling area were significantly higher than for the non-e-waste recycling area. However, there was no difference in plasma norepinephrine and heart rate between native children living in the non-e-waste recycling area and non-native children living in the non-e-waste recycling area. PM 2.5 , PM 10 , SO 2 and NO 2 data, over the 30-day and the 4-month average of pollution before the health examination, showed a positive association with plasma norepinephrine level. PM 2.5 , PM 10 , SO 2 , NO 2 and CO concentrations, over the 24 h of the day of the health examination, the 3 previous 24-hour periods before the health examination, and the 24 h after the health examination, were related to increase in heart rate. At the same time, plasma norepinephrine and heart rate on children in the high air pollution level group (≤50-m radius of family-run workshops) were higher than those in the low air pollution level group. Our results suggest that air pollution exposure in e-waste recycling areas could result in an increase in heart rate and plasma norepinephrine, implying e-waste air pollutant exposure

  19. Evaluation methodology of a manipulator actuator for the dismantling process during nuclear decommissioning

    International Nuclear Information System (INIS)

    Park, Jongwon; Kim, Chang-Hoi; Jeong, Kyung-min; Choi, Byung-Seon; Moon, Jeikwon

    2016-01-01

    Highlights: • A methodology to evaluate actuators of a dismantling manipulator. • Evaluation criteria for choosing the most suitable actuator type. • A mathematical evaluation model for evaluation. • The evaluation method is expected to be used for determining other manipulators. - Abstract: This paper presents a methodology to evaluate actuators of a manipulator for dismantling nuclear power plants. Actuators are the most dominant components because a dismantling manipulator relies heavily on the actuator type used. To select the most suitable actuator, evaluation criteria are presented in four categories based on the nuclear dismantling environment. A mathematical model is presented and evaluation results are calculated with weights and scores for each criterion. The proposed evaluation method is expected to be used for determining other aspects of the design of dismantling manipulators.

  20. Assessing and monitoring soil quality at agricultural waste disposal areas-Soil Indicators

    Science.gov (United States)

    Doula, Maria; Kavvadias, Victor; Sarris, Apostolos; Lolos, Polykarpos; Liakopoulou, Nektaria; Hliaoutakis, Aggelos; Kydonakis, Aris

    2014-05-01

    . Results indicate that there are soil parameters that can be used as indictors to assess soil quality at such areas. For the two cases, i.e pistachio wastes and olive oil mill wastes, different soil parameters were identified as potential indicators. In specific, for OMW the proposed indicators are: organic matter, electrical conductivity, total N, total polyphenols, exchangeable K, DTPA-available Fe, available P and pH (for the cases of acid soils). For pistachio wastes, it seems that the most appropriate indictors are: organic matter, electrical conductivity, exchangeable Mg, DTPA-available Fe, DTPA-available Cu, available B. A monitoring system was developed which may assist authorities and policy makers to continuously monitor the disposal areas or areas where wastes are used for fertilization/irrigation. For this, soil parameters were mapped with respect to the depth, date and temporal variations of their spatial distribution (spatial surfaces). Interpolated surfaces based on the Inverse Distance Weighted method (IDW) were created and integrated within a geospatial web based map application tool.

  1. Geostatistical methodology for waste optimization of contaminated premises - 59344

    International Nuclear Information System (INIS)

    Desnoyers, Yvon; Dubot, Didier

    2012-01-01

    The presented methodological study illustrates a Geo-statistical approach suitable for radiological evaluation in nuclear premises. The waste characterization is mainly focused on floor concrete surfaces. By modeling the spatial continuity of activities, Geo-statistics provide sound methods to estimate and map radiological activities, together with their uncertainty. The multivariate approach allows the integration of numerous surface radiation measurements in order to improve the estimation of activity levels from concrete samples. This way, a sequential and iterative investigation strategy proves to be relevant to fulfill the different evaluation objectives. Waste characterization is performed on risk maps rather than on direct interpolation maps (due to bias of the selection on kriging results). The use of several estimation supports (punctual, 1 m 2 , room) allows a relevant radiological waste categorization thanks to cost-benefit analysis according to the risk of exceeding a given activity threshold. Global results, mainly total activity, are similarly quantified to precociously lead the waste management for the dismantling and decommissioning project. This paper recalled the geo-statistics principles and demonstrated how this methodology provides innovative tools for the radiological evaluation of contaminated premises. The relevance of this approach relies on the presence of a spatial continuity for radiological contamination. In this case, geo-statistics provides reliable activity estimates, uncertainty quantification and risk analysis, which are essential decision-making tools for decommissioning and dismantling projects of nuclear installations. Waste characterization is then performed taking all relevant information into account: historical knowledge, surface measurements and samples. Thanks to the multivariate processing, the different investigation stages can be rationalized as regards quantity and positioning. Waste characterization is finally

  2. Hanford 200 area (sanitary) waste water system

    International Nuclear Information System (INIS)

    Danch, D.A.; Gay, A.E.

    1994-09-01

    The US Department of Energy (DOE) Hanford Site is located in southeastern Washington State. The Hanford Site is approximately 1,450 sq. km (560 sq. mi) of semiarid land set aside for activities of the DOE. The reactor fuel processing and waste management facilities are located in the 200 Areas. Over the last 50 years at Hanford dicard of hazardous and sanitary waste water has resulted in billions of liters of waste water discharged to the ground. As part of the TPA, discharges of hazardous waste water to the ground and waters of Washington State are to be eliminated in 1995. Currently sanitary waste water from the 200 Area Plateau is handled with on-site septic tank and subsurface disposal systems, many of which were constructed in the 1940s and most do not meet current standards. Features unique to the proposed new sanitary waste water handling systems include: (1) cost effective operation of the treatment system as evaporative lagoons with state-of-the-art liner systems, and (2) routing collection lines to avoid historic contamination zones. The paper focuses on the challenges met in planning and designing the collection system

  3. Source segregation of food waste in office areas: Factors affecting waste generation rates and quality

    DEFF Research Database (Denmark)

    Edjabou, Vincent Maklawe Essonanawe; Boldrin, Alessio; Scheutz, Charlotte

    2015-01-01

    Existing legislation mandates that the amount of waste being recycled should be increased. Among others, in its Resource Strategy Plan, the Danish Government decided that at least 60% of food waste generated by the service sector, including in office areas, should be source-sorted and collected...... separately by 2018. To assess the achievability of these targets, source-sorted food waste and residual waste from office areas was collected and weighed on a daily basis during 133 working days. Waste composition analyses were conducted every week to investigate the efficiency of the source-sorting campaign...... and the purity of the source-sorted food waste. The moisture content of source-sorted food waste and residual waste fractions, and potential methane production from source-sorted food waste, was also investigated.Food waste generation equated to 23. ±. 5. kg/employee/year, of which 20. ±. 5. kg...

  4. Dismantling and decommissioning of Jose Cabrera nuclear power plant

    International Nuclear Information System (INIS)

    Rodriguez, A.

    2009-01-01

    With the start of the dismantling works at the Jose Cabrera nuclear power plant now in sight, this is an appropriate moment to look back and consider recent history. The first time that the issue of nuclear power plant dismantling was dealt with was in 1975, at a conference in Paris entitled Nuclear Energy Maturity. Up until then the entire question had been one of design, construction and operation, but since that moment and it has been quite a while since that conference dismantling has begun to be seen as just another activity in the nuclear cycle, a final activity that will sooner or later affect all the facilities, an activity different from its predecessors and with the ultimate objective of restoring the sites for whatever use might be determined. During the 1960s and 1970s, the construction of nuclear power plants was widespread across the entire world. It was the baby boom of nuclear energy and now, forty or fifty years later, we are seeing the arrival of the end of the service lifetime of these plants and are faced with the corresponding general process of dismantling these installations. The dismantling of nuclear power plants has ceased to be an emerging issue and is now consolidated as a regular activity in the nuclear industry, albeit an activity that lacks adequate financing or specific regulation in certain countries. Fortunately this is not the case in Spain, since economic provisions have been planned and the regulatory framework developed. In view of the above, the dismantling of the nuclear power plants is an industrial activity involving specific technologies that implies new professional and business opportunities that should be absorbed and seized by society. In Spain the path followed in this direction has been a long one, as is underlined by the experiences of dismantling the Argos (Barcelona, 1998- 2004) and Arbi (Bilbao, 2002-2005) research reactors, the Andujar Uranium Mill (Jaen, 1991-1995), the Vandellos I nuclear power plant

  5. Nevada National Security Site 2012 Waste Management Monitoring Report Area 3 and Area 5 Radioactive Waste Management Site

    Energy Technology Data Exchange (ETDEWEB)

    Hudson, David B.

    2013-09-10

    Environmental monitoring data are collected at and around the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) at the Nevada National Security Site (NNSS). These data are associated with radiation exposure, air, groundwater, meteorology, and vadose zone. This report summarizes the 2012 environmental data to provide an overall evaluation of RWMS performance and to support environmental compliance and performance assessment (PA) activities. Some of these data (e.g., radiation exposure, air, and groundwater) are presented in other reports (National Security Technologies, LLC, 2012; 2013a; 2013b). Direct radiation monitoring data indicate exposure levels at the RWMSs are within the range of background levels measured at the NNSS. Slightly elevated exposure levels outside the Area 3 RWMS are attributed to nearby historical aboveground nuclear weapons tests. Air monitoring data show tritium concentrations in water vapor and americium and plutonium concentrations in air particles are only slightly above detection limits and background levels. The measured levels of radionuclides in air particulates and moisture are below Derived Concentration Standards for these radionuclides. Groundwater monitoring data indicate the groundwater in the uppermost aquifer beneath the Area 5 RWMS is not impacted by RWMS operations. Results of groundwater analysis from wells around the Area 5 RWMS were all below established investigation levels. Leachate samples collected from the leachate collection system at the mixed low-level waste cell were below established contaminant regulatory limits. The 133.9 millimeters (mm) (5.27 inches [in.]) of precipitation at the Area 3 RWMS during 2012 is 12% below the average of 153.0 mm (6.02 in.), and the 137.6 mm (5.42 in.) of precipitation at the Area 5 RWMS during 2012 is 11% below the average of 122.4 mm (4.82 in.). Water balance measurements indicate that evapotranspiration from the vegetated weighing lysimeter dries the soil and prevents

  6. Nevada National Security Site 2013 Waste Management Monitoring Report Area 3 and Area 5 Radioactive Waste Management Site

    Energy Technology Data Exchange (ETDEWEB)

    Hudson, D. B. [National Security Technologies, LLC, Las Vegas, NV (United States)

    2014-08-01

    Environmental monitoring data are collected at and around the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) within the Nevada National Security Site (NNSS). These data are associated with radiation exposure, air, groundwater, meteorology, and vadose zone. This report summarizes the 2013 environmental data to provide an overall evaluation of RWMS performance and to support environmental compliance and performance assessment (PA) activities. Some of these data (e.g., radiation exposure, air, and groundwater) are presented in other reports (National Security Technologies, LLC, 2013; 2014a; 2014b). Direct radiation monitoring data indicate exposure levels at the RWMSs are within the range of background levels measured at the NNSS. Slightly elevated exposure levels outside the Area 3 RWMS are attributed to nearby historical aboveground nuclear weapons tests. Air monitoring data show tritium concentrations in water vapor and americium and plutonium concentrations in air particles are close to detection limits and background levels. The measured levels of radionuclides in air particulates and moisture are below Derived Concentration Standards for these radionuclides. Groundwater monitoring data indicate the groundwater in the uppermost aquifer beneath the Area 5 RWMS is not impacted by RWMS operations. Results of groundwater analysis from wells around the Area 5 RWMS were all below established investigation levels. Leachate samples collected from the leachate collection system at the mixed low-level waste cell were below established contaminant regulatory limits. The 105.8 millimeters (mm) (4.17 inches [in.]) of precipitation at the Area 3 RWMS during 2013 is 30% below the average of 150.3 mm (5.92 in.), and the 117.5 mm (4.63 in.) of precipitation at the Area 5 RWMS during 2013 is 5% below the average of 123.6 mm (4.86 in.). Water balance measurements indicate that evapotranspiration from the vegetated weighing lysimeter dries the soil and prevents

  7. FY2010 ANNUAL REVIEW E-AREA LOW-LEVEL WASTE FACILITY PERFORMANCE ASSESSMENT AND COMPOSITE ANALYSIS

    Energy Technology Data Exchange (ETDEWEB)

    Butcher, T.; Swingle, R.; Crapse, K.; Millings, M.; Sink, D.

    2011-01-01

    The E-Area Low-Level Waste Facility (ELLWF) consists of a number of disposal units described in the Performance Assessment (PA)(WSRC, 2008b) and Composite Analysis (CA)(WSRC, 1997; WSRC, 1999): Low-Activity Waste (LAW) Vault, Intermediate Level (IL) Vault, Trenches (Slit Trenches [STs], Engineered Trenches [ETs], and Component-in-Grout [CIG] Trenches), and Naval Reactor Component Disposal Areas (NRCDAs). This annual review evaluates the adequacy of the approved 2008 ELLWF PA along with the Special Analyses (SAs) approved since the PA was issued. The review also verifies that the Fiscal Year (FY) 2010 low-level waste (LLW) disposal operations were conducted within the bounds of the PA/SA baseline, the Savannah River Site (SRS) CA, and the Department of Energy (DOE) Disposal Authorization Statement (DAS). Important factors considered in this review include waste receipts, results from monitoring and research and development (R&D) programs, and the adequacy of controls derived from the PA/SA baseline. Sections 1.0 and 2.0 of this review are a summary of the adequacy of the PA/SA and CA, respectively. An evaluation of the FY2010 waste receipts and the resultant impact on the ELLWF is summarized in Section 3.1. The results of the monitoring program, R&D program, and other relevant factors are found in Section 3.2, 3.3 and 3.4, respectively. Section 4.0 contains the CA annual determination similarly organized. SRS low-level waste management is regulated under DOE Order 435.1 (DOE, 1999a) and is authorized under a DAS as a federal permit. The original DAS was issued by the DOE-Headquarters (DOE-HQ) on September 28, 1999 (DOE, 1999b) for the operation of the ELLWF and the Saltstone Disposal Facility (SDF). The 1999 DAS remains in effect for the regulation of the SDF. Those portions of that DAS applicable to the ELLWF were superseded by revision 1 of the DAS on July 15, 2008 (DOE, 2008b). The 2008 PA and DAS were officially implemented by the facility on October 31, 2008

  8. Mixed Waste Focus Area program management plan

    International Nuclear Information System (INIS)

    Beitel, G.A.

    1996-10-01

    This plan describes the program management principles and functions to be implemented in the Mixed Waste Focus Area (MWFA). The mission of the MWFA is to provide acceptable technologies that enable implementation of mixed waste treatment systems developed in partnership with end-users, stakeholders, tribal governments and regulators. The MWFA will develop, demonstrate and deliver implementable technologies for treatment of mixed waste within the DOE Complex. Treatment refers to all post waste-generation activities including sampling and analysis, characterization, storage, processing, packaging, transportation and disposal

  9. RCRA Assessment Plan for Single-Shell Tank Waste Management Area S-SX at the Hanford Site

    International Nuclear Information System (INIS)

    Chou, C.J.; Johnson, V.G.

    1999-01-01

    A groundwater quality assessment plan was prepared for waste management area S-SX at the Hanford Site. Groundwater monitoring is conducted at this facility in accordance with Title 40, Code of Federal Regulation (CFR) Part 265, Subpart F [and by reference of Washington Administrative Code (WAC) 173-303-400(3)]. The facility was placed in assessment groundwater monitoring program status after elevated waste constituents and indicator parameter measurements (i.e., chromium, technetium-99 and specific conductance) in downgradient monitoring wells were observed and confirmed. A first determination, as allowed under 40 CFR 265.93(d), provides the owner/operator of a facility an opportunity to demonstrate that the regulated unit is not the source of groundwater contamination. Based on results of the first determination it was concluded that multiple source locations in the waste management area could account for observed spatial and temporal groundwater contamination patterns. Consequently, a continued investigation is required. This plan, developed using the data quality objectives process, is intended to comply with the continued investigation requirement. Accordingly, the primary purpose of the present plan is to determine the rate and extent of dangerous waste (hexavalent chromium and nitrate) and radioactive constituents (e.g., technetium-99) in groundwater and to determine their concentrations in groundwater beneath waste management area S-SX. Comments and concerns expressed by the Washington State Department of Ecology on the initial waste management area S-SX assessment report were addressed in the descriptive narrative of this plan as well as in the planned activities. Comment disposition is documented in a separate addendum to this plan

  10. Dismantling and decontamination of the PIVER prototype vitrification facility

    International Nuclear Information System (INIS)

    Jouan, A.

    1989-01-01

    The PIVER facility was dismantled for replacement by a new continuous pilot plant. The more important operation concerns the vitrification cell, containing equipments of the process, for complete disposal and maximum decontamination, requiring dismantling, cutting, conditioning and removal of equipment inside the cell. Manipulators, handling and cutting tools were used. Activity of removed material and irradiation of personal are followed during the work for matching intervention means to operation conditions [fr

  11. FEBEX-DP. Dismantling the ''full-scale engineered barrier experiment'' after 18 years of operation at the Grimsel Test Site, Switzerland

    Energy Technology Data Exchange (ETDEWEB)

    Kober, Florian; Gaus, Irina [Nagra, Wettingen (Switzerland)

    2015-07-01

    The FEBEX experiment at the Grimsel Test Site (GTS) consists of an in-situ full-scale engineered barrier system (EBS) test for the disposal of high-level waste (HLW). It is performed under natural conditions in crystalline rock in which the canisters are placed horizontally in drifts and are surrounded by a clay barrier constructed of highly compacted bentonite blocks. A partial dismantling and sampling of the EBS was carried out during 2002. Heating of the FEBEX started in 1997 and since then a constant temperature of 100 deg C has been maintained, while the bentonite buffer has been slowly hydrating in a natural way. A total of 632 sensors in the bentonite barrier, the rock mass, the heaters and the service zone record temperature, water saturation, humidity, total pressure, displacement, and water pressure. The hydration pattern is relatively symmetric, with no major differences along the axis. Although the host rock is characterized by heterogeneities with zones of higher permeability, the resaturation process is driven by the suction of the bentonite rather than by the availability of water in the rock, especially in the early phase. After 17 years, the water content in the buffer close to the heater still continues to increase slowly. The hydraulic pore pressures in the buffer and the geosphere have practically stabilized. The total pressure in general continues to increase in most points into the buffer, where in some parts pressures of over 6 MPa are registered. The long monitoring phase and the partial dismantling in 2002 indicate that the EBS has largely performed as expected and the major processes and couplings affecting the buffer saturation during the initial thermal period identified prior to the start of the experiment have been confirmed. A comprehensive report documents and reviews the state of the FEBEX (Lanyon and Gaus, 2013). After 18 years of operation the experiment will be excavated and dismantled in 2015. The main objectives of the FEBEX

  12. The study on the overseas recycling technology of the radioactive metallic wastes

    International Nuclear Information System (INIS)

    Kim, H. R.; Jung, Y. S.; Sin, J. I.

    2002-01-01

    It was understood that regulation criteria for material release varied with countries and that international standards were not setup. But, most advanced countries are continuously studying on the recycling of metallic wastes for the purpose of the reuse of resources and disposal cost reduction. Practically, the advanced countries make a lot of cost profits compared with disposal as their metallic wastes are recycled and reused through technology like melting. In our case, the recycle criteria for radioactive waste containing radioactive nuclide with long half-life such as Cs-137(half-life: 30y) and Co-60(half-life: 5.26y) including others, which are generated from the nuclear fission or dismantling of nuclear facilities, are not yet established. Therefore, it is required that the recommendation and legalization of the regulatory criteria be carried out for the recycle and reuse of metallic wastes to be generated from the dismantling of domestic nuclear facilities in the future

  13. Radioactive wastes in the areas adjacent to Finland. The improvement of the problem is slow

    International Nuclear Information System (INIS)

    Varjoranta, T.

    1997-01-01

    The radioactive waste problem in the area of Murmansk located in Northwestern Russia is analysed in the article. The radioactive wastes have accumulated from e.g. the military ships, ice-breakers and the Kola nuclear power plant. The problem is also a concern of neighboring countries and the international cooperation efforts to mitigate the problem are also described

  14. E-Area Vault Concrete Material Property And Vault Durability/Degradation Projection Recommendations

    Energy Technology Data Exchange (ETDEWEB)

    Phifer, M. A. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2014-03-11

    Subsequent to the 2008 E-Area Low-Level Waste Facility (ELLWF) Performance Assessment (PA) (WSRC 2008), two additional E-Area vault concrete property testing programs have been conducted (Dixon and Phifer 2010 and SIMCO 2011a) and two additional E-Area vault concrete durability modeling projections have been made (Langton 2009 and SIMCO 2012). All the information/data from these reports has been evaluated and consolidated herein by the Savannah River National Laboratory (SRNL) at the request of Solid Waste Management (SWM) to produce E-Area vault concrete hydraulic and physical property data and vault durability/degradation projection recommendations that are adequately justified for use within associated Special Analyses (SAs) and future PA updates. The Low Activity Waste (LAW) and Intermediate Level (IL) Vaults structural degradation predictions produced by Carey 2006 and Peregoy 2006, respectively, which were used as the basis for the 2008 ELLWF PA, remain valid based upon the results of the E-Area vault concrete durability simulations reported by Langton 2009 and those reported by SIMCO 2012. Therefore revised structural degradation predictions are not required so long as the mean thickness of the closure cap overlying the vaults is no greater than that assumed within Carey 2006 and Peregoy 2006. For the LAW Vault structural degradation prediction (Carey 2006), the mean thickness of the overlying closure cap was taken as nine feet. For the IL Vault structural degradation prediction (Peregoy 2006), the mean thickness of the overlying closure cap was taken as eight feet. The mean closure cap thicknesses as described here for both E-Area Vaults will be included as a key input and assumption (I&A) in the next revision to the closure plan for the ELLWF (Phifer et al. 2009). In addition, it has been identified as new input to the PA model to be assessed in the ongoing update to the new PA Information UDQE (Flach 2013). Once the UDQE is approved, the SWM Key I

  15. E-Area Vault Concrete Material Property And Vault Durability/Degradation Projection Recommendations

    International Nuclear Information System (INIS)

    Phifer, M. A.

    2014-01-01

    Subsequent to the 2008 E-Area Low-Level Waste Facility (ELLWF) Performance Assessment (PA) (WSRC 2008), two additional E-Area vault concrete property testing programs have been conducted (Dixon and Phifer 2010 and SIMCO 2011a) and two additional E-Area vault concrete durability modeling projections have been made (Langton 2009 and SIMCO 2012). All the information/data from these reports has been evaluated and consolidated herein by the Savannah River National Laboratory (SRNL) at the request of Solid Waste Management (SWM) to produce E-Area vault concrete hydraulic and physical property data and vault durability/degradation projection recommendations that are adequately justified for use within associated Special Analyses (SAs) and future PA updates. The Low Activity Waste (LAW) and Intermediate Level (IL) Vaults structural degradation predictions produced by Carey 2006 and Peregoy 2006, respectively, which were used as the basis for the 2008 ELLWF PA, remain valid based upon the results of the E-Area vault concrete durability simulations reported by Langton 2009 and those reported by SIMCO 2012. Therefore revised structural degradation predictions are not required so long as the mean thickness of the closure cap overlying the vaults is no greater than that assumed within Carey 2006 and Peregoy 2006. For the LAW Vault structural degradation prediction (Carey 2006), the mean thickness of the overlying closure cap was taken as nine feet. For the IL Vault structural degradation prediction (Peregoy 2006), the mean thickness of the overlying closure cap was taken as eight feet. The mean closure cap thicknesses as described here for both E-Area Vaults will be included as a key input and assumption (I and A) in the next revision to the closure plan for the ELLWF (Phifer et al. 2009). In addition, it has been identified as new input to the PA model to be assessed in the ongoing update to the new PA Information UDQE (Flach 2013). Once the UDQE is approved, the SWM Key I and

  16. French Regulatory Framework for the Recycling/Reuse of Nuclear Waste and the Dismantling of George Besse Gaseous Diffusion Plant

    Energy Technology Data Exchange (ETDEWEB)

    Themines, R., E-mail: robert.themines@areva.com [AREVA (France)

    2011-07-15

    The regulatory framework in France governing the management of materials containing low levels of radionuclides is described. The plans for the management of the materials arising from the dismantling of the Georges Besse Gaseous Diffusion Plant are described as an example of the application of the regulations. (author)

  17. Melting of contaminated steel scrap from the dismantling of the CO2 systems of gas cooled, graphite moderated nuclear reactors

    International Nuclear Information System (INIS)

    Feaugas, J.; Jeanjacques, M.; Peulve, J.

    1994-01-01

    G2 and G3 are the natural Uranium cooled reactors Graphite/Gas. The two reactors were designed for both plutonium and electricity production (45 MWe). The dismantling of the reactors at stage 2 has produced more than 4 000 tonnes of contaminated scrap. Because of their large mass and low residual contamination level, the French Atomic Energy Commission (CEA) considered various possibilities for the processing of these metallic products in order to reduce the volume of waste going to be stored. After different studies and tests of several processes and the evaluation of their results, the choice to melt the dismantled pipeworks was taken. It was decided to build the Nuclear Steel Melting Facility known as INFANTE, in cooperation with a steelmaker (AHL). The realization time schedule for the INFANTE lasted 20 months. It included studies, construction and the licensing procedure. (authors). 2 tabs., 3 figs

  18. [Heavy Metal Contamination in Farmland Soils at an E-waste Disassembling Site in Qingyuan, Guangdong, South China].

    Science.gov (United States)

    Zhang, Jin-lian; Ding, Jiang-feng; Lu, Gui-ning; Dang, Zhi; Yi, Xiao-yun

    2015-07-01

    Crude e-waste dismantling activities have caused a series of environmental pollution problems, and the pollutants released from the dismantling activities would finally pose high risks to human health by means of the accumulation through food chains. To explore the contamination status of heavy metals to the surrounding farmland soils in Longtang and Shijiao Town, Qingyuan, Guangdong, China, 22 farmland soil samples were collected and analyzed for the contents, spatial distributions and chemical forms of 6 heavy metals (Pb, Cu, Cd, Zn, Cr and Ni). The results showed that the 6 heavy metals exhibited obvious accumulations when compared to the corresponding background values in Guangdong Province. According to farmland environmental quality evaluation standard for edible agricultural products HJ 332-2006, the pollution severity of heavy metals was evaluated by monomial pollution index and Nemerow synthetic pollution index methods, the results indicated that 72. 7% of the soil samples contained one or more kinds of heavy metals with higher concentrations than the corresponding standard values, Cd, Cu, Pb and Zn were the main metals in the polluted soils, and for the proportion of contaminated soil samples in all the 22 samples, Cd was the highest, followed by Cu, and finally Pb and Zn. Nemerow synthetic pollution index further revealed that 68. 2% of soil samples were contaminated, and among them 53. 3% of samples were heavily contaminated. Most of the heavy metals were well correlated with each other at the 0. 05 or 0. 01 level, which indicated that primitive e-waste recycling activities were an important source of the heavy metal contamination in Longtang and Shijiao Town. The contents of Cd, Pb, Cu and Zn in surface soils were higher than those of other soil layers, and the contents of these 4 metals in deep soils (20- 100 cm) did not show significant decreases with the increasing depths. The contents of Cr and Ni maintained constant, and exhibited no statistical

  19. Optimized phases for reactor dismantling – an efficient and sustainable concept

    International Nuclear Information System (INIS)

    Krüger, S.; Winter, J.

    2013-01-01

    D&D projects are driven by costs, to implement an optimization process from the very beginning is key. Optimized strategy and sequencing of the dismantling (hot to cold) will provide serious economical savings . Larger dismantling packages will reduce interfaces and ease the coordination efforts on site. Early usage of mobile systems will ease the large-scale release for dismantling Social transition has to be addressed with priority and to be planned at an early phase in the D&D planning Concept, Planning & Project Management will influence the success of the project much more than the used technique

  20. Hazardous E-waste and its impact on soil structure

    Science.gov (United States)

    Dharini, K.; Cynthia, J. Bernadette; Kamalambikai, B.; Sudar Celestina, J. P. Arul; Muthu, D.

    2017-07-01

    E-waste disposal has been a significant issue over the past few decades with the development of technology and the plethora of electronic products produced. The inclusive term E-Waste encapsulates various forms of electrical and electronical equipment which provides no value to the current owners and it is one among the fastest growing waste streams. E-Waste is a complex, non-biodegradable waste which is generally dumped in mountain like heaps. These wastes are said to have a large quantities of lead, cadmium, arsenic etc.it is mandatory to dispose such scrupulously since they have the ability to affect the soil and water parameters. Solid waste management is a blooming field which strives to reduce the accumulation of used electronic gadgets. Rainwater gets infiltrated through the e-waste landfill and it leaches through the soil which in turn reaches the groundwater directly thereby affecting the water intended for drinking and domestic purposes. This study focuses on the consequences of toxic waste by comparing the difference in properties of the soil structure prior to and after the e-waste landfill at various concentrations.

  1. Prevention-intervention strategies to reduce exposure to e-waste.

    Science.gov (United States)

    Heacock, Michelle; Trottier, Brittany; Adhikary, Sharad; Asante, Kwadwo Ansong; Basu, Nil; Brune, Marie-Noel; Caravanos, Jack; Carpenter, David; Cazabon, Danielle; Chakraborty, Paromita; Chen, Aimin; Barriga, Fernando Diaz; Ericson, Bret; Fobil, Julius; Haryanto, Budi; Huo, Xia; Joshi, T K; Landrigan, Philip; Lopez, Adeline; Magalini, Frederico; Navasumrit, Panida; Pascale, Antonio; Sambandam, Sankar; Aslia Kamil, Upik Sitti; Sly, Leith; Sly, Peter; Suk, Ann; Suraweera, Inoka; Tamin, Ridwan; Vicario, Elena; Suk, William

    2018-05-11

    As one of the largest waste streams, electronic waste (e-waste) production continues to grow in response to global demand for consumer electronics. This waste is often shipped to developing countries where it is disassembled and recycled. In many cases, e-waste recycling activities are conducted in informal settings with very few controls or protections in place for workers. These activities involve exposure to hazardous substances such as cadmium, lead, and brominated flame retardants and are frequently performed by women and children. Although recycling practices and exposures vary by scale and geographic region, we present case studies of e-waste recycling scenarios and intervention approaches to reduce or prevent exposures to the hazardous substances in e-waste that may be broadly applicable to diverse situations. Drawing on parallels identified in these cases, we discuss the future prevention and intervention strategies that recognize the difficult economic realities of informal e-waste recycling.

  2. Modelling the correlations of e-waste quantity with economic increase.

    Science.gov (United States)

    Awasthi, Abhishek Kumar; Cucchiella, Federica; D'Adamo, Idiano; Li, Jinhui; Rosa, Paolo; Terzi, Sergio; Wei, Guoyin; Zeng, Xianlai

    2018-02-01

    Waste from Electrical and Electronic Equipment (WEEE or e-waste) is regarded as one of the fastest growing waste streams in the world and is becoming an emerging issue owing to adverse consequences on the natural environment and the human health. This research article reveals the presence of a strong linear correlation among global e-waste generation and Gross Domestic Product. The obtained results indicate that the best fit for data can be reached by comparing e-waste collected volumes and GDP PPS. More in detail, an increase of 1000 GDP PPS means an additional 0.27kg of e-waste collected and 0.22kg of e-waste reused/recycled. Furthermore, for each additional citizen, there will be an increase of 7.7kg of e-waste collected and 6.2kg of e-waste reused/recycled. The better collection of e-waste acts an important role concerning the circular economy, and it can be an advantageous approach. Therefore, e-waste could be considered as an opportunity for recycling or recovery of valuable metals (e.g., copper, gold, silver, and palladium), given their significant content in precious metals than in mineral ores. Copyright © 2017 Elsevier B.V. All rights reserved.

  3. Land suitability for waste disposal in metropolitan areas.

    Science.gov (United States)

    Baiocchi, Valerio; Lelo, Keti; Polettini, Alessandra; Pomi, Raffaella

    2014-08-01

    Site selection for waste disposal is a complex task that should meet the requirements of communities and stakeholders. In this article, three decision support methods (Boolean logic, index overlay and fuzzy gamma) are used to perform land suitability analysis for landfill siting. The study was carried out in one of the biggest metropolitan regions of Italy, with the objective of locating suitable areas for waste disposal. Physical and socio-economic information criteria for site selection were decided by a multidisciplinary group of experts, according to state-of-the-art guidelines, national legislation and local normative on waste management. The geographic information systems (GIS) based models used in this study are easy to apply but require adequate selection of criteria and weights and a careful evaluation of the results. The methodology is arranged in three steps, reflecting the criteria defined by national legislation on waste management: definition of factors that exclude location of landfills or waste treatment plants; classification of the remaining areas in terms of suitability for landfilling; and evaluation of suitable sites in relation to preferential siting factors (such as the presence of quarries or dismissed plants). The results showed that more than 80% of the provincial territory falls within constraint areas and the remaining territory is suitable for waste disposal for 0.72% or 1.93%, according to the model. The larger and most suitable sites are located in peripheral areas of the metropolitan system. The proposed approach represents a low-cost and expeditious alternative to support the spatial decision-making process. © The Author(s) 2014.

  4. Intestinal Parasites among Waste-Handlers in Jos Metropolitan Area ...

    African Journals Online (AJOL)

    Intestinal Parasites among Waste-Handlers in Jos Metropolitan Area of Plateau State, Nigeria. ... Solid waste management is associated with health hazards. ... Waste disposal workers are at high risk of infection with different species of ...

  5. Blending of Low-Level Radioactive Waste for NPP Decommissioning

    International Nuclear Information System (INIS)

    Kessel, David S.; Kim, Chang Lak

    2016-01-01

    Radioactive wastes may are generated throughout the life cycle of a nuclear power plant. These wastes can be categorized as follows: Operational wastes in the form of solids, liquids and gases. Plant components resulting from maintenance, modification or life extension work (e.g. steam generators, pumps, valves, control rods, spent filters, etc.). Materials from the structure of the plant and equipment (e.g. metals and concrete that result in large quantities of waste upon decommissioning Large quantities of materials will be generated during decommissioning and dismantling. A significant proportion of these materials will only be slightly contaminated with radioactivity. Due to economies of scale, recycling and reuse options are more likely to be cost effective for such large quantities of materials than for the relatively smaller quantities arising during operation. These materials also present opportunities to manage waste more effectively by utilizing the approaches to blending discussed in this paper. The NRC uses allows blending based on risk and performance measures for public health and safety. Performance-based regulation means that the blended waste must meet the limits on radiation exposures at the disposal facility and limits on how much the radioactivity concentration may vary or in other words, how homogeneous and well mixed it is. LLW blending is an approach to waste management that can give greater flexibility for disposal options for NPP waste from the entire life cycle of the plant which includes operational wastes such as ion exchange resins and filters, maintenance wastes which include replacement components (discrete items), and large quantities of decommissioning wastes

  6. Blending of Low-Level Radioactive Waste for NPP Decommissioning

    Energy Technology Data Exchange (ETDEWEB)

    Kessel, David S.; Kim, Chang Lak [KEPCO, Ulsan (Korea, Republic of)

    2016-05-15

    Radioactive wastes may are generated throughout the life cycle of a nuclear power plant. These wastes can be categorized as follows: Operational wastes in the form of solids, liquids and gases. Plant components resulting from maintenance, modification or life extension work (e.g. steam generators, pumps, valves, control rods, spent filters, etc.). Materials from the structure of the plant and equipment (e.g. metals and concrete that result in large quantities of waste upon decommissioning Large quantities of materials will be generated during decommissioning and dismantling. A significant proportion of these materials will only be slightly contaminated with radioactivity. Due to economies of scale, recycling and reuse options are more likely to be cost effective for such large quantities of materials than for the relatively smaller quantities arising during operation. These materials also present opportunities to manage waste more effectively by utilizing the approaches to blending discussed in this paper. The NRC uses allows blending based on risk and performance measures for public health and safety. Performance-based regulation means that the blended waste must meet the limits on radiation exposures at the disposal facility and limits on how much the radioactivity concentration may vary or in other words, how homogeneous and well mixed it is. LLW blending is an approach to waste management that can give greater flexibility for disposal options for NPP waste from the entire life cycle of the plant which includes operational wastes such as ion exchange resins and filters, maintenance wastes which include replacement components (discrete items), and large quantities of decommissioning wastes.

  7. Topical Session on the Decommissioning and Dismantling Safety Case

    International Nuclear Information System (INIS)

    2002-01-01

    Set up by the Radioactive Waste Management Committee (RWMC), the WPDD brings together senior representatives of national organisations who have a broad overview of Decommissioning and Dismantling (D and D) issues through their work as regulators, implementers, R and D experts or policy makers. These include representatives from regulatory authorities, industrial decommissioners from the NEA Cooperative Programme on Exchange of Scientific and Technical Information on Nuclear Installation Decommissioning Projects (CPD), and cross-representation from the NEA Committee on Nuclear Regulatory Activities, the Committee on Radiation Protection and Public Health, and the RWMC. The EC is a member of the WPDD and the IAEA also participates. This ensures co-ordination amongst activities in these international programmes. Participation from civil society organisations is considered on a case by case basis, and has already taken place through the active involvement of the Group of Municipalities with Nuclear Installations at the first meeting of the WPDD At its second meeting, in Paris, 5-7 December 2001, the WPDD held two topical sessions on the D and D Safety Case and on the Management of Materials from D and D, respectively. This report documents the topical session on the safety case. The topical session was meant to provide an exchange of information and experience on the following issues: What topics should be included in a safety case? Of what should it consist? Is there sufficient and complete guidance nationally and internationally? How do practices differ internationally? Main boundary condition to this session was that it would deal with plants where spent fuel has been removed. Also the topical sessions was kept at a level that makes the most of the varied constituency of the WPDD. Namely, interface issues are important, and issue-identification and discussion was the immediate goal. There was less interest in examining areas where variability amongst national

  8. Immobilized low-activity waste site borehole 299-E17-21

    International Nuclear Information System (INIS)

    Reidel, S.P.; Reynolds, K.D.; Horton, D.G.

    1998-08-01

    The Tank Waste Remediation System (TWRS) is the group at the Hanford Site responsible for the safe underground storage of liquid waste from previous Hanford Site operations, the storage and disposal of immobilized tank waste, and closure of underground tanks. The current plan is to dispose of immobilized low-activity tank waste (ILAW) in new facilities in the southcentral part of 200-East Area and in four existing vaults along the east side of 200-East Area. Boreholes 299-E17-21, B8501, and B8502 were drilled at the southwest corner of the ILAW site in support of the Performance Assessment activities for the disposal options. This report summarizes the initial geologic findings, field tests conducted on those boreholes, and ongoing studies. One deep (480 feet) borehole and two shallow (50 feet) boreholes were drilled at the southwest corner of the ILAW site. The primary factor dictating the location of the boreholes was their characterization function with respect to developing the geohydrologic model for the site and satisfying associated Data Quality Objectives. The deep borehole was drilled to characterize subsurface conditions beneath the ILAW site, and two shallow boreholes were drilled to support an ongoing environmental tracer study. The tracer study will supply information to the Performance Assessment. All the boreholes provide data on the vadose zone and saturated zone in a previously uncharacterized area

  9. Addendum to the composite analysis for the E-Area Vaults and Saltstone Disposal Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Cook, J.R.

    2000-03-13

    This report documents the composite analysis performed on the two active SRS low-level radioactive waste disposal facilities. The facilities are the Z-Area Saltstone Disposal Facility and the E-Area Vaults Disposal Facility.

  10. Addendum to the composite analysis for the E-Area Vaults and Saltstone Disposal Facilities

    International Nuclear Information System (INIS)

    Cook, J.R.

    2000-01-01

    This report documents the composite analysis performed on the two active SRS low-level radioactive waste disposal facilities. The facilities are the Z-Area Saltstone Disposal Facility and the E-Area Vaults Disposal Facility

  11. Mock-up test of remote controlled dismantling apparatus for large-sized vessels (contract research)

    Energy Technology Data Exchange (ETDEWEB)

    Myodo, Masato; Miyajima, Kazutoshi [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment; Okane, Shogo [Japan Atomic Energy Research Inst., Oarai, Ibaraki (Japan). Oarai Research Establishment

    2001-03-01

    The Remote dismantling apparatus, which is equipped with multi-units for functioning of washing, cutting, collection of cut pieces and so on, has been constructed to dismantle the large-sized vessels in the JAERI's Reprocessing Test Facility (JRTF). The apparatus has five-axis movement capability and its operation is performed remotely. The mock-up tests were performed to evaluate the applicability of the apparatus to actual dismantling activities by using the mock-ups of LV-3 and LV-5 in the facility. It was confirmed that each unit was satisfactory functioned by remote operation. Efficient procedures for dismantling the large-sized vessel was studied and various date was obtained in the mock-up tests. This apparatus was found to be applicable for the actual dismantling activity in JRTF. (author)

  12. Mock-up test of remote controlled dismantling apparatus for large-sized vessels (contract research)

    International Nuclear Information System (INIS)

    Myodo, Masato; Miyajima, Kazutoshi; Okane, Shogo

    2001-03-01

    The Remote dismantling apparatus, which is equipped with multi-units for functioning of washing, cutting, collection of cut pieces and so on, has been constructed to dismantle the large-sized vessels in the JAERI's Reprocessing Test Facility (JRTF). The apparatus has five-axis movement capability and its operation is performed remotely. The mock-up tests were performed to evaluate the applicability of the apparatus to actual dismantling activities by using the mock-ups of LV-3 and LV-5 in the facility. It was confirmed that each unit was satisfactory functioned by remote operation. Efficient procedures for dismantling the large-sized vessel was studied and various date was obtained in the mock-up tests. This apparatus was found to be applicable for the actual dismantling activity in JRTF. (author)

  13. Development of an augmented reality based simulation system for cooperative plant dismantling work

    International Nuclear Information System (INIS)

    Ishii, Hirotake; Man, Zhiyuan; Yan, Weida; Shimoda, Hiroshi; Izumi, Masanori

    2015-01-01

    An augmented reality-based simulation system for cooperative plant dismantling work has been developed and evaluated. In the system, behaviors of virtual objects such as the dismantling target, chain blocks, and trolleys are physically simulated. Their appearance is superimposed on camera images captured with cameras on users' tablet devices. The users can manipulate virtual objects cooperatively via touch operation. They can cut the dismantling targets, lift them on the trolleys using chain blocks, and convey them through narrow passages to ascertain whether the dismantling targets can be conducted without colliding with the passages. During the simulation, collisions between the virtual objects and real work environment are detected based on their three-dimensional shape data measured in advance. The collided parts are visualized using augmented reality superimposition. Four evaluators assessed the simulation system. Results show that the simulation system can be useful for prior examination of dismantling works, but some points were also found to need improvement. (author)

  14. A State of the Art on the Technology for Recycling and Reuse of the Decommissioning Concrete Wastes

    Energy Technology Data Exchange (ETDEWEB)

    Jung, Chung Hun; Choi, Wang Kyu; Min, Byung Youn; Oh, Won Zin; Lee, Kun Woo [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2008-02-15

    This report describes the reduction and recycling technology of decommissioning concrete waste. Decontamination and decommissioning (D and D) becomes one of the most important nuclear markets especially in the developed countries including USA, UK and France where lots of the retired nuclear facilities have been waiting for decommissioning. In our country the KAERI has been carrying out the decommissioning of the retired TRIGA MARK II and III research reactors and an uranium conversion plant as the first national decommissioning project since 1998. One of the most important areas of the decommissioning is a management of a huge amount of a decommissioning waste the cost of which is more than half of the total decommissioning cost. Therefore reduction in decommissioning waste by a reuse or a recycle is an important subject of decommissioning technology development in the world. Recently much countries pay attention to recycle the large amount of concrete dismantling waste resulted from both a nuclear and a non nuclear industries. In our country, much attention was taken in a recycle of concrete dismantling waste as a concrete aggregate, but a little success has been resulted due to the disadvantages such as a weakness of hardness and surface mortar contamination. A recycle in nuclear industry and a self disposal of the radioactively contaminated concrete wastes are main directions of concrete wastes resulted from a nuclear facility decommissioning. In this report it was reviewed the state of art of the related technologies for a reduction and a recycle of concrete wastes from a nuclear decommissioning in the country and abroad. Prior to recycle and reuse in the nuclear sector, however, the regulatory criteria for the recycle and reuse of concrete waste should be established in parallel with the development of the recycling technology.

  15. A State of the Art on the Technology for Recycling and Reuse of the Decommissioning Concrete Wastes

    International Nuclear Information System (INIS)

    Jung, Chung Hun; Choi, Wang Kyu; Min, Byung Youn; Oh, Won Zin; Lee, Kun Woo

    2008-02-01

    This report describes the reduction and recycling technology of decommissioning concrete waste. Decontamination and decommissioning (D and D) becomes one of the most important nuclear markets especially in the developed countries including USA, UK and France where lots of the retired nuclear facilities have been waiting for decommissioning. In our country the KAERI has been carrying out the decommissioning of the retired TRIGA MARK II and III research reactors and an uranium conversion plant as the first national decommissioning project since 1998. One of the most important areas of the decommissioning is a management of a huge amount of a decommissioning waste the cost of which is more than half of the total decommissioning cost. Therefore reduction in decommissioning waste by a reuse or a recycle is an important subject of decommissioning technology development in the world. Recently much countries pay attention to recycle the large amount of concrete dismantling waste resulted from both a nuclear and a non nuclear industries. In our country, much attention was taken in a recycle of concrete dismantling waste as a concrete aggregate, but a little success has been resulted due to the disadvantages such as a weakness of hardness and surface mortar contamination. A recycle in nuclear industry and a self disposal of the radioactively contaminated concrete wastes are main directions of concrete wastes resulted from a nuclear facility decommissioning. In this report it was reviewed the state of art of the related technologies for a reduction and a recycle of concrete wastes from a nuclear decommissioning in the country and abroad. Prior to recycle and reuse in the nuclear sector, however, the regulatory criteria for the recycle and reuse of concrete waste should be established in parallel with the development of the recycling technology

  16. Detection and Monitoring of E-Waste Contamination through Remote Sensing and Image Analysis

    Science.gov (United States)

    Garb, Yaakov; Friedlander, Lonia

    2015-04-01

    Electronic waste (e-waste) is one of today's fastest growing waste streams, and also one of the more problematic, as this end-of-life product contains precious metals mixed with and embedded in a variety of low value and potentially harmful plastic and other materials. This combination creates a powerful incentive for informal value chains that transport, extract from, and dispose of e-waste materials in far-ranging and unregulated ways, and especially in settings where regulation and livelihood alternatives are sparse, most notably in areas of India, China, and Africa. E-waste processing is known to release a variety of contaminants, such as heavy metals and persistent organic pollutants, including flame retardants, dioxins and furans. In several sites, where the livelihoods of entire communities are dependent on e-waste processing, the resulting contaminants have been demonstrated to enter the hydrological system and food chain and have serious health and ecological effects. In this paper we demonstrate for the first time the usefulness of multi-spectral remote sensing imagery to detect and monitor the release and possibly the dispersal of heavy metal contaminants released in e-waste processing. While similar techniques have been used for prospecting or for studying heavy metal contamination from mining and large industrial facilities, we suggest that these techniques are of particular value in detecting contamination from the more dispersed, shifting, and ad-hoc kinds of release typical of e-waste processing. Given the increased resolution and decreased price of multi-spectral imagery, such techniques may offer a remarkably cost-effective and rapidly responsive means of assessing and monitoring this kind of contamination. We will describe the geochemical and multi-spectral image-processing principles underlying our approach, and show how we have applied these to an area in which we have a detailed, multi-temporal, spatially referenced, and ground

  17. Remote tool development for nuclear dismantling operations

    International Nuclear Information System (INIS)

    Craig, G.; Ferlay, J.C.; Ieracitano, F.

    2003-01-01

    Remote tool systems to undertake nuclear dismantling operations require careful design and development not only to perform their given duty but to perform it safely within the constraints imposed by harsh environmental conditions. Framatome ANP NUCLEAR SERVICES has for a long time developed and qualified equipment to undertake specific maintenance operations of nuclear reactors. The tool development methodology from this activity has since been adapted to resolve some very challenging reactor dismantling operations which are demonstrated in this paper. Each nuclear decommissioning project is a unique case, technical characterisation data is generally incomplete. The development of the dismantling methodology and associated equipment is by and large an iterative process combining design and simulation with feasibility and validation testing. The first stage of the development process involves feasibility testing of industrial tools and examining adaptations necessary to control and deploy the tool remotely with respect to the chosen methodology and environmental constraints. This results in a prototype tool and deployment system to validate the basic process. The second stage involves detailed design which integrates any remaining technical and environmental constraints. At the end of this stage, tools and deployment systems, operators and operating procedures are qualified on full scale mock ups. (authors)

  18. Decontamination of alpha contaminated metallic waste by cerium IV redox process

    International Nuclear Information System (INIS)

    Shah, J.G.; Dhami, P.S.; Gandhi, P.M.; Wattal, P.K.

    2012-01-01

    Decontamination of alpha contaminated metallic waste is an important aspect in the management of waste generated during dismantling and decommissioning of nuclear facilities. Present work on cerium redox process targets decontamination of alpha contaminated metallic waste till it qualifies for the non alpha waste category for disposal in near surface disposal facility. Recovery of the alpha radio nuclides and cerium from aqueous secondary waste streams was also studied deploying solvent extraction process and established. The alpha-lean secondary waste stream has been immobilised in cement based matrix for final disposal. (author)

  19. Area 5 Radioactive Waste Management Site Safety Assessment Document

    International Nuclear Information System (INIS)

    Horton, K.K.; Kendall, E.W.; Brown, J.J.

    1980-02-01

    The Area 5 Radioactive Waste Management Safety Assessment Document evaluates site characteristics, facilities and operating practices which contribute to the safe handling and storage/disposal of radioactive wastes at the Nevada Test Site. Physical geography, cultural factors, climate and meteorology, geology, hydrology (with emphasis on radionuclide migration), ecology, natural phenomena, and natural resources are discussed and determined to be suitable for effective containment of radionuclides. Also considered, as a separate section, are facilities and operating practices such as monitoring; storage/disposal criteria; site maintenance, equipment, and support; transportation and waste handling; and others which are adequate for the safe handling and storage/disposal of radioactive wastes. In conclusion, the Area 5 Radioactive Waste Management Site is suitable for radioactive waste handling and storage/disposal for a maximum of twenty more years at the present rate of utilization

  20. Design and application of environmentally effective concrete with usage of chrysotile-cement waste

    OpenAIRE

    Egorova Lada; Semenov Vyacheslav; Pligina Anna; Askhadullin Aizat

    2016-01-01

    Construction is resource-demanding industry, characterized by a large volume of waste. Particularly chrysotile cement waste obtained both in production and in dismantling over age chrysotile-cement products: corrugated asbestos boards and flat sheets, chrysotile-cement tubes. We propose to use dry chrysotile-cement waste as recycled aggregate for concrete. Based on developed compositions and identified properties of heavy concrete with chrysotile-cement waste introduce this technology to the ...

  1. Safety assessment for Area 5 radioactive-waste-management site

    International Nuclear Information System (INIS)

    Hunter, P.H.; Card, D.H.; Horton, K.

    1982-09-01

    The Area 5 Radioactive Waste Management Safety Assessment Document contains evaluations of site characteristics, facilities, and operating practices that contribute to the safe handling, storage, and disposal of low-level radioactive wastes at the Nevada Test Site. Physical geography, cultural factors, climate and meteorology, geology, hydrology (with emphasis on radionuclide migration), ecology, natural phenomena, and natural resources are discussed and determined to be suitable for effective containment of radionuclides. A separate section considers facilities and operating practices such as monitoring, storage/disposal criteria, site maintenance, equipment, and support. The section also considers the transportation and waste handling requirements supporting the new Greater Confinement Disposal Facility (GCDF), GCDF demonstration project, and other requirements for the safe handling, storage, and disposal of low-level radioactive wastes. Finally, the document provides an analysis of releases and an assessment of the near-term operational impacts and dose commitments to operating personnel and the general public from normal operations and anticipated accidental occurrences. The conclusion of this report is that the Area 5 Radioactive Waste Management Site is suitable for low-level radioactive waste handling, storage, and disposal. Also, the new GCDF demonstration project will not affect the overall safety of the Area 5 Radioactive Waste Management Site

  2. Fuel cycle and waste newsletter. Vol. 2, No. 3, December 2006

    International Nuclear Information System (INIS)

    2007-01-01

    This issue of the Fuel Cycle and Waste Newsletter is entirely devoted to the work performed within the Waste Technology Section of the IAEA's Fuel Cycle and Waste Technology Division. It covers the broad spectrum of activities from waste characterisation and conditioning to disposal, decommissioning and site remediation. The safe and efficient management of radioactive waste is a prerequisite for the continued successful use of nuclear power. The management of low and intermediate level waste is a mature and evolving activity in most Member States with a nuclear power programme, although not all have operating disposal facilities. Suitable strategies and infrastructures can be developed in other countries and international work will continue on the safe disposal of disused sealed radioactive sources. Progress in Finland, France, Sweden and the USA indicates that the first geological repository for High Level and Fuel Wastes may be in operation before 2020. However, the siting of repositories remains of concern and requires the involvement of all of the different stakeholders. Decommissioning of power reactors is a commercially mature technology. In this context, the transfer of experiences to countries with small nuclear systems or only research reactors and other research facilities will remain very important. The newsletter reports on the Vinca-VIND Programme, radioactive waste management, e.g. waste retrieval at Solymar, Hungary, radioactive waste disposal (low level waste at the Centre de L'Aube, France), decommissioning of installations, e.g. decommissioning project Maine USA (Yankee reactor), environmental site remediation, management of disused sealed radioactive sources, and the NET-Enabled Waste Management Database. It furthermore informs that the cooperation with the Russian Federation in the area of the nuclear legacy clean-up has substantially expanded within the framework of Global Partnership Programme, initiated by the G8 countries, which covers the

  3. Addendum to the Composite Analysis for the E-Area Vaults and Saltstone Disposal Facilities

    International Nuclear Information System (INIS)

    Cook, J.R.

    2002-01-01

    Revision 1 of the Composite Analysis (CA) Addendum has been prepared to respond to the U.S. Department of Energy (DOE) Low-Level Waste Disposal Facilities Federal Review Group review of the CA. This addendum to the composite analysis responds to the conditions of approval. The composite analysis was performed on the two active SRS low-level radioactive waste disposal facilities. The facilities are the Z-Area Saltstone Disposal Facility and the E-Area Vaults Disposal Facility. The analysis calculated potential releases to the environment from all sources of residual radioactive material expected to remain in the General Separations Area (GSA). The GSA is the central part of the Savannah River Site and contains all of the waste disposal facilities, the chemical separation facilities and associated high-level waste storage facilities, as well as numerous other sources of radioactive material

  4. Appendix D-12A Building 332C Waste Accumulation Area

    International Nuclear Information System (INIS)

    Chase, D

    2005-01-01

    This appendix is designed to provide information specific to the Building 332C Waste Accumulation Area (B-332C WAA), a waste storage area. This appendix is not designed to be used as a sole source of information. All general information that is not specific to the B-332C WAA is included in the Contingency Plan for Waste Accumulation Areas, dated July 2004, and should be referenced. The B-332C WAA is located in the southwest quadrant of the LLNL Main Site in Building 332, Room 1330. Hazardous and mixed wastes may be stored at the B-332C WAA for 90 days or less, until transferred to the appropriate Radioactive and Hazardous Waste Management (RHWM) facility or other permitted treatment, storage or disposal facility (TSDF). Radioactive waste may also be stored at the WAA. The design storage capacity of this WAA is 2,200 gallons

  5. The study on recycle scheme of the metallic radioactive wastes (II)

    International Nuclear Information System (INIS)

    Shin, J. I.; Park, J. H.; Jung, K. J.

    2003-01-01

    It was understood that regulation criteria for material release varied with countries and that international standards were not setup. But, most advanced countries are continuously studying on the recycling of metallic wastes for the purpose of the reuse of resources and disposal cost reduction. Practically, the advanced countries make a lot of cost profits compared with disposal as their metallic wastes are recycled and reused through technology like melting. The reasonable international standards are also expected to be set in the near future because of the aggressive cooperation between international agencies such as IAEA and NEA toward recycling these wastes. In our case, the recycle criteria for radioactive waste containing radioactive nuclide with long half-life such as Cs-137(half-life: 30y) and Co-60(half-life: 5.26y) including others, which are generated from the nuclear fission or dismantling of nuclear facilities, are not yet established. Therefore, it is required that the recommendation and legalization of the regulatory criteria be carried out for the recycle and reuse of metallic wastes to be generated from the dismantling of domestic nuclear facilities in the future

  6. Nevada National Security Site 2015 Waste Management Monitoring Report Area 3 and Area 5 Radioactive Waste Management Sites

    International Nuclear Information System (INIS)

    Black, David; Hudson, David

    2016-01-01

    Environmental monitoring data are collected at and around the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) within the Nevada National Security Site (NNSS). These data include direct radiation exposure, as well as radiation from the air, groundwater, meteorology, and vadose zone. This report summarizes the 2015 environmental data to provide an overall evaluation of RWMS performance and to support environmental compliance and performance assessment (PA) activities. Some of these data (e.g., radiation exposure, air, and groundwater) are presented in other reports developed by National Security Technologies, LLC. Direct radiation monitoring data indicate exposure levels at the RWMSs are within the range of background levels measured at the NNSS. Slightly elevated exposure levels outside the Area 3 RWMS are attributed to nearby historical aboveground nuclear weapons tests. Air monitoring data show that tritium concentrations in water vapor and americium and plutonium concentrations in air particles are below Derived Concentration Standards for these radionuclides. Groundwater monitoring data indicate the groundwater in the uppermost aquifer beneath the Area 5 RWMS is not impacted by RWMS operations. Results of groundwater analysis from wells around the Area 5 RWMS were all below established investigation levels. Leachate samples collected from the leachate collection system at the mixed low-level waste cell were below established contaminant regulatory limits. During 2015, precipitation at the Area 3 RWMS was 0.9% above average, and precipitation at the Area 5 RWMS was 25% above average. Water balance measurements indicate that evapotranspiration from the vegetated weighing lysimeter dries the soil and prevents downward percolation of precipitation more effectively than evaporation as measured from the bare-soil weighing lysimeter. The 1.8 inches of precipitation in September reached the lowest sensors at 180 cm on the Cell 5S and 5N covers, however the

  7. Nevada National Security Site 2015 Waste Management Monitoring Report Area 3 and Area 5 Radioactive Waste Management Sites

    Energy Technology Data Exchange (ETDEWEB)

    Black, David [National Security Technologies, LLC. (NSTec), Mercury, NV (United States); Hudson, David [National Security Technologies, LLC. (NSTec), Mercury, NV (United States)

    2016-08-20

    Environmental monitoring data are collected at and around the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) within the Nevada National Security Site (NNSS). These data include direct radiation exposure, as well as radiation from the air, groundwater, meteorology, and vadose zone. This report summarizes the 2015 environmental data to provide an overall evaluation of RWMS performance and to support environmental compliance and performance assessment (PA) activities. Some of these data (e.g., radiation exposure, air, and groundwater) are presented in other reports developed by National Security Technologies, LLC. Direct radiation monitoring data indicate exposure levels at the RWMSs are within the range of background levels measured at the NNSS. Slightly elevated exposure levels outside the Area 3 RWMS are attributed to nearby historical aboveground nuclear weapons tests. Air monitoring data show that tritium concentrations in water vapor and americium and plutonium concentrations in air particles are below Derived Concentration Standards for these radionuclides. Groundwater monitoring data indicate the groundwater in the uppermost aquifer beneath the Area 5 RWMS is not impacted by RWMS operations. Results of groundwater analysis from wells around the Area 5 RWMS were all below established investigation levels. Leachate samples collected from the leachate collection system at the mixed low-level waste cell were below established contaminant regulatory limits. During 2015, precipitation at the Area 3 RWMS was 0.9% above average, and precipitation at the Area 5 RWMS was 25% above average. Water balance measurements indicate that evapotranspiration from the vegetated weighing lysimeter dries the soil and prevents downward percolation of precipitation more effectively than evaporation as measured from the bare-soil weighing lysimeter. The 1.8 inches of precipitation in September reached the lowest sensors at 180 cm on the Cell 5S and 5N covers, however the

  8. 40 CFR 60.35e - Waste management guidelines.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false Waste management guidelines. 60.35e... (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Emission Guidelines and Compliance Times for Hospital/Medical/Infectious Waste Incinerators § 60.35e Waste management guidelines. For approval, a State...

  9. The further development and evaluation of an automatic dismantler of short staple ring-spun yarns

    CSIR Research Space (South Africa)

    Fassihi, A

    2014-07-01

    Full Text Available Information System (AFIS) single fiber length tests, the fibers from automatically dismantled ring-spun cotton yarns are very similar in their properties to those dismantled by hand (manually). It was also found that, at a speed of 2 m/min, the yarn dismantler...

  10. International E-Waste Management Network (IEMN)

    Science.gov (United States)

    EPA and the Environmental Protection Administration Taiwan (EPAT) have collaborated since 2011 to build global capacity for the environmentally sound management of waste electrical and electronic equipment (WEEE), which is commonly called e-waste.

  11. Municipal Solid Waste Composition Study of Selected Area in Gambang, Pahang

    International Nuclear Information System (INIS)

    Mokhtar, Nadiah; Romali, Noor Suraya; Osmi, Siti Fatimah Che; Ishak, Wan Faizal Wan; Samah, Mohd Armi Abu

    2013-01-01

    The amount of municipal solid waste (MSW) generated continue to increase in response to rapid growth in population, change in life style and accelerated urbanization and industrialization process. The study on MSW is important in order to determine the composition further seeks an immediate remedy to minimize the waste generated at the early stage. As most of the MSW goes to the landfill or dumping sites, particularly in Malaysia, closure of filled-up landfill may become an alarm clock for an immediate action of proper solid waste management. This research aims to determine the waste composition generated from selected residential area at Gambang, Kuantan, Pahang which represent Old residential area (ORA), Intermediate residential area (IRA) and New residential area (NRA). The study was conducted by segregating and weighing solid waste in the residential area into 6 main components ie., food waste, paper, plastic, glass, metal and others. In a period of four weeks, samples from the residential unit were taken and analyzed. The MSW generation rates were recorded vary from 0.217 to 0.388 kg person −1 day −1 . Food waste has become the major solid waste component generated daily which mounted up to 50%. From this research, the result revealed that the recyclable composition of waste generated by residents have a potential to be reuse, recycle and reduce at the point sources.

  12. Municipal Solid Waste Composition Study of Selected Area in Gambang, Pahang

    Science.gov (United States)

    Mokhtar, Nadiah; Ishak, Wan Faizal Wan; Suraya Romali, Noor; Fatimah Che Osmi, Siti; Armi Abu Samah, Mohd

    2013-06-01

    The amount of municipal solid waste (MSW) generated continue to increase in response to rapid growth in population, change in life style and accelerated urbanization and industrialization process. The study on MSW is important in order to determine the composition further seeks an immediate remedy to minimize the waste generated at the early stage. As most of the MSW goes to the landfill or dumping sites, particularly in Malaysia, closure of filled-up landfill may become an alarm clock for an immediate action of proper solid waste management. This research aims to determine the waste composition generated from selected residential area at Gambang, Kuantan, Pahang which represent Old residential area (ORA), Intermediate residential area (IRA) and New residential area (NRA). The study was conducted by segregating and weighing solid waste in the residential area into 6 main components ie., food waste, paper, plastic, glass, metal and others. In a period of four weeks, samples from the residential unit were taken and analyzed. The MSW generation rates were recorded vary from 0.217 to 0.388 kg person-1day-1. Food waste has become the major solid waste component generated daily which mounted up to 50%. From this research, the result revealed that the recyclable composition of waste generated by residents have a potential to be reuse, recycle and reduce at the point sources.

  13. Better safe than sorry: Increasing safety in radioactive waste management

    International Nuclear Information System (INIS)

    Gaspar, Miklos; Mutluer, Adem

    2015-01-01

    Abderrahim Bouih used to be worried about space. In charge of managing Morocco’s radioactive waste since 2006, he had long projected that the country’s sole radioactive waste facility would fill up by 2019. Thanks to a new methodology he and his colleagues learned through an IAEA project, they can now dismantle smoke detectors, lightning rods and other waste that contains radioactive material, safely separating the radioactive components from the metal, and significantly reducing the amount of radioactive waste they need to store.

  14. E-waste: an assessment of global production and environmental impacts.

    Science.gov (United States)

    Robinson, Brett H

    2009-12-20

    E-waste comprises discarded electronic appliances, of which computers and mobile telephones are disproportionately abundant because of their short lifespan. The current global production of E-waste is estimated to be 20-25 million tonnes per year, with most E-waste being produced in Europe, the United States and Australasia. China, Eastern Europe and Latin America will become major E-waste producers in the next ten years. Miniaturisation and the development of more efficient cloud computing networks, where computing services are delivered over the internet from remote locations, may offset the increase in E-waste production from global economic growth and the development of pervasive new technologies. E-waste contains valuable metals (Cu, platinum group) as well as potential environmental contaminants, especially Pb, Sb, Hg, Cd, Ni, polybrominated diphenyl ethers (PBDEs), and polychlorinated biphenyls (PCBs). Burning E-waste may generate dioxins, furans, polycyclic aromatic hydrocarbons (PAHs), polyhalogenated aromatic hydrocarbons (PHAHs), and hydrogen chloride. The chemical composition of E-waste changes with the development of new technologies and pressure from environmental organisations on electronics companies to find alternatives to environmentally damaging materials. Most E-waste is disposed in landfills. Effective reprocessing technology, which recovers the valuable materials with minimal environmental impact, is expensive. Consequently, although illegal under the Basel Convention, rich countries export an unknown quantity of E-waste to poor countries, where recycling techniques include burning and dissolution in strong acids with few measures to protect human health and the environment. Such reprocessing initially results in extreme localised contamination followed by migration of the contaminants into receiving waters and food chains. E-waste workers suffer negative health effects through skin contact and inhalation, while the wider community are exposed

  15. E-waste: An assessment of global production and environmental impacts

    International Nuclear Information System (INIS)

    Robinson, Brett H.

    2009-01-01

    E-waste comprises discarded electronic appliances, of which computers and mobile telephones are disproportionately abundant because of their short lifespan. The current global production of E-waste is estimated to be 20-25 million tonnes per year, with most E-waste being produced in Europe, the United States and Australasia. China, Eastern Europe and Latin America will become major E-waste producers in the next ten years. Miniaturisation and the development of more efficient cloud computing networks, where computing services are delivered over the internet from remote locations, may offset the increase in E-waste production from global economic growth and the development of pervasive new technologies. E-waste contains valuable metals (Cu, platinum group) as well as potential environmental contaminants, especially Pb, Sb, Hg, Cd, Ni, polybrominated diphenyl ethers (PBDEs), and polychlorinated biphenyls (PCBs). Burning E-waste may generate dioxins, furans, polycyclic aromatic hydrocarbons (PAHs), polyhalogenated aromatic hydrocarbons (PHAHs), and hydrogen chloride. The chemical composition of E-waste changes with the development of new technologies and pressure from environmental organisations on electronics companies to find alternatives to environmentally damaging materials. Most E-waste is disposed in landfills. Effective reprocessing technology, which recovers the valuable materials with minimal environmental impact, is expensive. Consequently, although illegal under the Basel Convention, rich countries export an unknown quantity of E-waste to poor countries, where recycling techniques include burning and dissolution in strong acids with few measures to protect human health and the environment. Such reprocessing initially results in extreme localised contamination followed by migration of the contaminants into receiving waters and food chains. E-waste workers suffer negative health effects through skin contact and inhalation, while the wider community are exposed

  16. E-waste: An assessment of global production and environmental impacts

    Energy Technology Data Exchange (ETDEWEB)

    Robinson, Brett H., E-mail: brett.robinson@lincoln.ac.nz [Department of Soil and Physical Sciences, Lincoln University, Lincoln 7647, Canterbury (New Zealand)

    2009-12-20

    E-waste comprises discarded electronic appliances, of which computers and mobile telephones are disproportionately abundant because of their short lifespan. The current global production of E-waste is estimated to be 20-25 million tonnes per year, with most E-waste being produced in Europe, the United States and Australasia. China, Eastern Europe and Latin America will become major E-waste producers in the next ten years. Miniaturisation and the development of more efficient cloud computing networks, where computing services are delivered over the internet from remote locations, may offset the increase in E-waste production from global economic growth and the development of pervasive new technologies. E-waste contains valuable metals (Cu, platinum group) as well as potential environmental contaminants, especially Pb, Sb, Hg, Cd, Ni, polybrominated diphenyl ethers (PBDEs), and polychlorinated biphenyls (PCBs). Burning E-waste may generate dioxins, furans, polycyclic aromatic hydrocarbons (PAHs), polyhalogenated aromatic hydrocarbons (PHAHs), and hydrogen chloride. The chemical composition of E-waste changes with the development of new technologies and pressure from environmental organisations on electronics companies to find alternatives to environmentally damaging materials. Most E-waste is disposed in landfills. Effective reprocessing technology, which recovers the valuable materials with minimal environmental impact, is expensive. Consequently, although illegal under the Basel Convention, rich countries export an unknown quantity of E-waste to poor countries, where recycling techniques include burning and dissolution in strong acids with few measures to protect human health and the environment. Such reprocessing initially results in extreme localised contamination followed by migration of the contaminants into receiving waters and food chains. E-waste workers suffer negative health effects through skin contact and inhalation, while the wider community are exposed

  17. RSW-MCFP: A Resource-Oriented Solid Waste Management System for a Mixed Rural-Urban Area through Monte Carlo Simulation-Based Fuzzy Programming

    Directory of Open Access Journals (Sweden)

    P. Li

    2013-01-01

    Full Text Available The growth of global population and economy continually increases the waste volumes and consequently creates challenges to handle and dispose solid wastes. It becomes more challenging in mixed rural-urban areas (i.e., areas of mixed land use for rural and urban purposes where both agricultural waste (e.g., manure and municipal solid waste are generated. The efficiency and confidence of decisions in current management practices significantly rely on the accurate information and subjective judgments, which are usually compromised by uncertainties. This study proposed a resource-oriented solid waste management system for mixed rural-urban areas. The system is featured by a novel Monte Carlo simulation-based fuzzy programming approach. The developed system was tested by a real-world case with consideration of various resource-oriented treatment technologies and the associated uncertainties. The modeling results indicated that the community-based bio-coal and household-based CH4 facilities were necessary and would become predominant in the waste management system. The 95% confidence intervals of waste loadings to the CH4 and bio-coal facilities were 387, 450 and 178, 215 tonne/day (mixed flow, respectively. In general, the developed system has high capability in supporting solid waste management for mixed rural-urban areas in a cost-efficient and sustainable manner under uncertainty.

  18. The dismantling of nuclear power plants which are not in use

    International Nuclear Information System (INIS)

    Tanguy, P.

    1987-01-01

    At the end of its life span, a nuclear power plant contains big quantities of radioactive products. The corresponding risks must be controlled and over the long range, all radioactivity must be definitively removed. The latter operation is called dismantling. In France, at the beginning of 1987, five nuclear units which were permanently put out of use have to be dismantled. These units are presented in this article. From this presentation, it can be seen that there are now techniques which provide for complete control of the risks corresponding to radioactivity. However, in France, as in the rest of the world, the dismantling of nuclear plants will not attain its full industrial level until the 21st Century. The problems which have to be solved are known, but better performing technologies have to be developed in order to obtain a superior protection of dismantling work crews and a reduction of costs. This article concludes with an appeal for high French interest in international activities in this field [fr

  19. Evaluation of the ORNL area for future waste burial facilities

    International Nuclear Information System (INIS)

    Lomenick, T.F.; Byerly, D.W.; Gonzales, S.

    1983-10-01

    Additional waste-burial facilities will be needed at ORNL within this decade. In order to find environmentally acceptable sites, the ORNL area must be systematically evaluated. This document represents the first step in that selection process. Geologic and hydrologic data from the literature and minor field investigations are used to identify more favorable sites for Solid Waste Storage Area (SWSA) 7. Also underway at this time is a companion study to locate a Central Waste Storage Area which could be used in the future to accommodate wastes generated by the X-10, Y-12, and K-25 facilities. From the several watershed options available, the Whiteoak Creek drainage basin is selected as the most promising hydrologic regime. This area contains all past and present waste-disposal facilities and is thus already well monitored. The seven bedrock units within the ORNL area are evaluated as potential burial media. Shales of the Conasauga Group, which are currently used for waste burial in the Whiteoak Creek drainage basin, and the Knox Group are considered the leading candidates. Although the residuum derived from and overlying the Knox dolomite has many favorable characteristics and may be regarded as having a high potential for burial of low-level wastes, at the present it is unproven. Therefore, the Conasauga shales are considered a preferable option for SWSA 7 within the ORNL area. Since the Conasauga interval is currently used for waste burial, it is better understood. One tract in Melton Valley that is underlain by Conasauga shales is nominated for detailed site-characterization studies, and several other tracts are recommended for future exploratory drilling. Exploration is also suggested for a tract in the upper Whiteoak Creek basin where Knox residuum is the shallow subsurface material

  20. E-WASTE: ETHICAL IMPLICATIONS FOR EDUCATION AND RESEARCH

    Directory of Open Access Journals (Sweden)

    MUAZ HAWARI

    2010-09-01

    Full Text Available “E-waste” is a popular, informal name for electronic products nearing the end of their “useful life”. This includes discarded computers, televisions, VCRs, stereos, copiers, fax machines, electric lamps, cell phones, audio equipment and batteries. E-wastes are considered dangerous, as certain components of some of these electronic products contain materials; such as lead; that are hazardous, depending on their condition and density. If improperly disposed, E-wastes can leach lead and other substances into soil and groundwater posing a threat to human health and environment. Many of these electronic products can be reused, refurbished, or recycled in an environmentally sound manner so that they are less harmful to the ecosystem. This paper highlights the types and hazards of E-wastes particularly the computers’ waste. The dimensions and ethicality of the problem in the third-world countries are reviewed. The needs for the appropriate management of e-waste and options that can be implemented are discussed. After reviewing the Islamic concepts for environmental protection, ethical implications for curriculum development as well research directions are highlighted. Elements for a course on e-waste as well as some across-the-curriculum topics are proposed. This is specially tailored to suit the faculty of Engineering at the International Islamic University-Malaysia.