WorldWideScience

Sample records for draft interim bioventing

  1. Interim Measures Work Plan Expanded Bioventing System SWMU 55 (IRP Site FT-03)

    National Research Council Canada - National Science Library

    1997-01-01

    This interim measures work plan (IMWP) presents the scope for an expanded bioventing system to conduct in situ treatment of the remaining fuel-contaminated soils at solid waste management unit (SWMU...

  2. Interim Corrective Measures Work Plan for the Expanded Bioventing System Eglin Main Base Old Fire Training Area

    National Research Council Canada - National Science Library

    1997-01-01

    This interim corrective measures work plan (ICM work plan) presents the scope for an expanded bioventing system for in situ treatment of fuel-contaminated soils at the Eglin Main Base Old Fire Training Area (old Eglin FTA...

  3. Remedial Action Plan for Expanded Bioventing System Facility 6454

    National Research Council Canada - National Science Library

    1996-01-01

    This draft remedial action plan (RAP) presents the scope for an expanded bioventing system for in situ treatment of fuel-contaminated soils at Site 6454 at Vandenberg Air Force Base (AFB), California...

  4. 75 FR 984 - Draft Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at CERCLA and RCRA Sites

    Science.gov (United States)

    2010-01-07

    ...The Environmental Protection Agency (EPA or the Agency) is announcing a 50-day public comment period for draft recommended interim preliminary remediation goals (PRGs) developed in the Draft Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and Resource Conservation and Recovery Act (RCRA) Sites. EPA's Office of Solid Waste and Emergency and Emergency Response (OSWER) has developed the draft recommended interim PRGs for dioxin in soil. These draft recommended interim PRGs were calculated using existing, peer- reviewed toxicity values and current EPA equations and default exposure assumptions. This Federal Register notice is intended to provide an opportunity for public comment on the draft recommended interim PRGs. EPA will consider any public comments submitted in accordance with this notice and may revise the draft recommended interim PRGs thereafter.

  5. Fundamentals of bioventing applied to fuel contaminated sites

    International Nuclear Information System (INIS)

    Dupont, R.R.

    1993-01-01

    Bioventing entails the use of soil vapor extraction (SVE) systems for the transport of oxygen to the subsurface, where indigenous organisms are stimulated to aerobically metabolize fuel components. Bioventing systems are designed and configured to optimize oxygen transfer and oxygen utilization efficiency, and are operated at much lower flow rates and with configurations much different than those of conventional SVE systems. Bioventing system applications and design are contrasted to those of conventional SVE systems, and the two key elements of bioventing system design evaluation, i.e., in situ microbial activity and air permeability determinations, are highlighted in this paper. The application of bioventing to vadose zone bioremediation was reviewed with particular emphasis on its advantages over aqueous based bioremediation systems in terms of its superior oxygen transfer efficiency. Finally, the application of bioventing and bioventing design concepts are illustrated through a case study of JP-4 jet fuel contaminated soil remediation at Hill AFB, Utah. 22 refs., 8 figs., 5 tabs

  6. Bioventing and air sparging: a field research study

    International Nuclear Information System (INIS)

    Moore, B.J.; Armstrong, J.E.; Hardisty, P.E.; Dupont, R.R.

    1997-01-01

    A study was conducted at Gulf Canada Resources' Strachan Gas Plant in Alberta, in which bioventing and air sparging were used individually and in combination to remediate a free-phase natural gas condensate plume estimated to cover approximately 65,000 m 2 . The condensate was composed of light hydrocarbons. Benzene, toluene, ethylbenzene and total xylenes (BTEX) made up a large portion of the dissolved plume. The objectives of the bioventing program were to: (1) study the use of biodegradation respiration rates and hydrocarbon vapour concentrations as indicators of soil clean-up progress, (2) study the effectiveness of bioventing during winter operations, (3) assess the degree of soil clean-up achievable through bioventing, and (4) evaluate the economics of bioventing. It was shown that bioventing is an economical in-situ remediation technique, costing about $10/m 3 . Air sparging involves the injection of air below the groundwater table to remove dissolved phased contaminants in-situ. The objectives of the air sparging program were to: (1) determine the zone of influence achievable through air sparging, (2) assess bioventing for treating hydrocarbon vapours introduced into the unsaturated zone during sparging, and (3) evaluate hydrocarbon mass removal effectiveness due to volatilization and biodegradation. It was shown that 90 per cent of the saturated zone hydrocarbon mass was removed during eight months of air sparging. 11 refs., 1 tab., 5 figs

  7. In situ respiration testing: A field treatability test for bioventing

    International Nuclear Information System (INIS)

    Kittel, J.A.; Hinchee, R.E.; Miller, R.; Vogel, C.; Hoeppel, R.

    1993-01-01

    Bioventing is the process of aerating subsurface soils to stimulate in situ biological activity and promote bioremediation. Bioventing differs from soil venting in remedial approach. Soil venting is designed and operated to maximize the volatilization of low-molecular-weight compounds, with some biodegradation occurring. In contrast, bioventing is designed to maximize biodegradation of aerobically biodegradable compounds, regardless of their molecular weight, with some volatilization occurring. Bioventing is gaining wide acceptance as a remediation alternative at petroleum-contaminated sites. However, site variability usually requires that a short term treatability test be conducted in situ at potential sites to determine the applicability of bioventing. Battelle has worked with the US Air Force and the US Navy to develop a simple and inexpensive field test to evaluate bioventing potential-contaminated sites. This test has been used to evaluate the applicability of bioventing at over 50 sites. The in situ respiration test consists of injecting air and an inert tracer gas (helium) over a 24-hour period to aerate soils at an oxygen-deficient, petroleum-contaminated site. Soil vapor samples are collected to determine oxygen utilization rates and carbon dioxide production rates. The stoichiometric relationship for the oxidation of hexane is used to calculate the biodegradation rate. The tracer gas is monitored to estimate the effect of diffusion on changes in soil-gas concentrations

  8. Economical wind powered bioventing systems successfully applied at remote locations

    International Nuclear Information System (INIS)

    Graves, D.; Wilson, B.; Walker, K.

    1996-01-01

    Wind-powered bioventing systems were designed to operate at remote locations in the absence of electrical power. Laboratory measurements of soil respiration under bioventing conditions indicated the biodegradation of up to 25 mg of weathered diesel per kg of site soil per day. Further testing demonstrated the potential for harnessing wind-power to stimulate air movement through vadose zone soil. Several wind-powered bioventing systems were installed near Nome, Alaska. In situ respiration tests, soil gas composition measurements and measurable pressure changes in the soil indicated that the systems were capable of aerating the soil. Diesel range oil measurements indicated contaminant reductions up to 90% after only two treatments seasons. The results demonstrate the effectiveness of wind-powered biovents. The low cost, low maintenance, and simplicity of the biovents make them a very attractive treatment option for windy, remote sites with unsaturated soil impacted by biodegradable contaminants

  9. Using in situ bioventing to minimize soil vapor extraction costs

    International Nuclear Information System (INIS)

    Downey, D.C.; Frishmuth, R.A.; Archabal, S.R.; Pluhar, C.J.; Blystone, P.G.; Miller, R.N.

    1995-01-01

    Gasoline-contaminated soils may be difficult to remediate with bioventing because high concentrations of gasoline vapors become mobile when air is injected into the soil. Because outward vapor migration is often unacceptable on small commercial sites, soil vapor extraction (SVE) or innovative bioventing techniques are required to control vapors and to increase soil gas oxygen levels to stimulate hydrocarbon biodegradation. Combinations of SVE, off-gas treatment, and bioventing have been used to reduce the costs normally associated with remediation of gasoline-contaminated sites. At Site 1, low rates of pulsed air injection were used to provide oxygen while minimizing vapor migration. At Site 2, a period of high-rate SVE and off-gas treatment was followed by long-term air injection. Site 3 used an innovative approach that combined regenerative resin for ex situ vapor treatment with in situ bioventing to reduce the overall cost of site remediation. At each of these Air Force sites, bioventing provided cost savings when compared to more traditional SVE methods

  10. A negative bioventing feasibility test

    International Nuclear Information System (INIS)

    DePaoli, D.W.; Greene, D.W.; Herbes, S.E.; Walzel, A.D.

    1994-01-01

    A bioventing feasibility test was conducted at a hydrocarbon fuel spill site at Oak Ridge National Laboratory. The soils at this site are generally of low air permeability and are representative of the clayey soils encountered at several Department of Energy sites and throughout the southeastern United States. The tests included an in situ air permeability test and in situ respiration tests at three well where highest soil contamination was measured. The in situ respiration tests showed that there was the potential for significant biodegradation in the soil with adequate oxygenation. The in situ permeability tests indicated that the majority of flow was trough fractures, rather than through the bulk soils. A helium tracer test verified that injected gas flowed directly to the surface through a small number of fractures, with no flow reaching the monitoring wells. These results indicate that oxygen transport to the bulk soils would be severely limited by diffusion, such that bioventing was deemed not feasible for this site. In light of these results, the importance of testing for fracture flow in soils of lower permeability is stressed -- whether the technology is bioventing or conventional soil venting

  11. 78 FR 5830 - Draft Environmental Assessment and Proposed Habitat Conservation Plan for the Interim Operations...

    Science.gov (United States)

    2013-01-28

    ...-FXES11120800000F2-123-F2] Draft Environmental Assessment and Proposed Habitat Conservation Plan for the Interim Operations of PacifiCorp's Klamath Hydroelectric Project on the Klamath River, Klamath County, OR, and... environmental assessment and proposed habitat conservation plan; request for comment. SUMMARY: We, the U.S. Fish...

  12. Final technology report for D-Area oil seepage basin bioventing optimization test, environmental restoration support

    International Nuclear Information System (INIS)

    Radway, J.C.; Lombard, K.H.; Hazen, T.C.

    1997-01-01

    One method proposed for the cleanup of the D-Area Oil Seepage Basin was in situ bioremediation (bioventing), involving the introduction of air and gaseous nutrients to stimulate contaminant degradation by naturally occurring microorganisms. To test the feasibility of this approach, a bioventing system was installed at the site for use in optimization testing by the Environmental Biotechnology Section of the Savannah River Technology Center. During the interim action, two horizontal wells for a bioventing remediation system were installed eight feet below average basin grade. Nine piezometers were also installed. In September of 1996, a generator, regenerative blower, gas cylinder station, and associated piping and nutrient injection equipment were installed at the site and testing was begun. After baseline characterization of microbial activity and contaminant degradation at the site was completed, four injection campaigns were carried out. These consisted of (1) air alone, (2) air plus triethylphosphate (TEP), (3) air plus nitrous oxide, and (4) air plus methane. This report describes results of these tests, together with conclusions and recommendations for further remediation of the site. Natural biodegradation rates are high. Oxygen, carbon dioxide, and methane levels in soil gas indicate substantial levels of baseline microbial activity. Oxygen is used by indigenous microbes for biodegradation of organics via respiration and hence is depleted in the soil gas and water from areas with high contamination. Carbon dioxide is elevated in contaminated areas. High concentrations of methane, which is produced by microbes via fermentation once the oxygen has been depleted, are found at the most contaminated areas of this site. Groundwater measurements also indicated that substantial levels of natural contaminant biodegradation occurred prior to air injection

  13. Bioventing of gasoline-contaminated soil under varied laboratory conditions

    International Nuclear Information System (INIS)

    Hallman, M.; Shewfelt, K.; Lee, H.; Zytner, R.G.

    2002-01-01

    Bioventing is becoming a popular in situ soil remediation technology for the treatment of hydrocarbon-contaminated soil. Bioventing relies on enhancing the growth of indigenous microorganisms, which can mineralize the contaminant in the presence of sufficient nutrients. Although bioventing is currently being used as a remediation technology, there are some important questions that remain to be answered in order to optimize the process. These questions include the optimum soil moisture content, type and amount of nutrients necessary, and the best means of producing these conditions in the field. To address these questions, two distinct phases of experiments were conducted. The first experimental phase was designed to determine the optimum moisture content, C:N ratio and form of nitrogen supply for this soil. Using approximately 200g of contaminated soil in each of a series of sealed respirometers, microbial degradation of gasoline under bioventing conditions was quantified for C:N ratios of 5, 10 and 20:1, using varying mixtures of NH 4 + - and NO 3 - -N. The results of the studies indicated that the optimum soil moisture content was 15 wt%, with a C:N ratio of 10:1, using a 100% ammonium application. Using the results of the first phase, a second phase of laboratory research was initiated. Five mesoscale reactors have been developed to simulate the bioventing process that takes place in the field. These reactors are filled with approximately 4kg of gasoline-contaminated soil. The initial results are favourable. (author)

  14. In situ bioventing in deep soils at arid sites

    International Nuclear Information System (INIS)

    Frishmuth, R.A.; Ratz, J.W.; Blicker, B.R.; Hall, J.F.; Downey, D.C.

    1995-01-01

    In situ bioventing has been shown to be a cost-effective remedial alternative for vadose zone soils. The success of the technology relies on the ability of indigenous soil microorganisms to utilize petroleum hydrocarbon contaminants as a primary metabolic substrate. Soil microbial populations are typically elevated in shallow soils due to an abundance of naturally occurring substrates and nutrients, but may be limited at greater depths due to a lack of these constituents. Therefore, the effectiveness of in situ bioventing is questionable in contaminated soil zones that extend far below the ground surface. Also, because the soil microbial population relies on soil moisture to sustain hydrocarbon degradation, the viability of bioventing is questionable in arid climates, where the soil moisture content is suspected to be minimal

  15. Investigations into the application of a combination of bioventing and biotrickling filter technologies for soil decontamination processes--a transition regime between bioventing and soil vapour extraction.

    Science.gov (United States)

    Magalhães, S M C; Ferreira Jorge, R M; Castro, P M L

    2009-10-30

    Bioventing has emerged as one of the most cost-effective in situ technologies available to address petroleum light-hydrocarbon spills, one of the most common sources of soil pollution. However, the major drawback associated with this technology is the extended treatment time often required. The present study aimed to illustrate how an intended air-injection bioventing technology can be transformed into a soil vapour extraction effort when the air flow rates are pushed to a stripping mode, thus leading to the treatment of the off-gas resulting from volatilisation. As such, a combination of an air-injection bioventing system and a biotrickling filter was applied for the treatment of contaminated soil, the latter aiming at the treatment of the emissions resulting from the bioventing process. With a moisture content of 10%, soil contaminated with toluene at two different concentrations, namely 2 and 14 mg g soil(-1), were treated successfully using an air-injection bioventing system at a constant air flow rate of ca. 0.13 dm(3) min(-1), which led to the removal of ca. 99% toluene, after a period of ca. 5 days of treatment. A biotrickling filter was simultaneously used to treat the outlet gas emissions, which presented average removal efficiencies of ca. 86%. The proposed combination of biotechnologies proved to be an efficient solution for the decontamination process, when an excessive air flow rate was applied, reducing both the soil contamination and the outlet gas emissions, whilst being able to reduce the treatment time required by bioventing only.

  16. Bioventing Pilot Test Work Plan for Site ST200 (SA38), McClellan Air Force Base, California

    National Research Council Canada - National Science Library

    1997-01-01

    This Bioventing Pilot Test Work Plan presents the scope of an in situ bioventing pilot test and installation of a bioventing system for treatment of petroleum hydrocarbon-contaminated soils at Site...

  17. Evaluation of natural attenuation, bioventing, bioaugmentation and bioaugmentation-bioventing techniques, for the biodegradation of diesel in a sandy soil, through column experiments

    International Nuclear Information System (INIS)

    Muskus Morales, Angelica Maria; Santoyo Munoz, Claudia; Plata Quintero, Luijesmarth Silvia

    2013-01-01

    The present study was developed within an inter-institutional agreement between the Universidad Pontificia Bolivariana, UPB-BBGA and the Colombian Petroleum Institute-ICP, in order to provide a solution to an environmental problem that occurs in areas where hydrocarbons are handled and where sandy soils have been found to be contaminated with diesel fuel with concentrations up to 6% at a maximum depth of 80 cm. For this study, the soil samples were artificially contaminated with diesel fuel in order to evaluate Natural Attenuation, Bioventing, Bioaugmentation and Bioaugmentation-Bioventing soil remediation techniques through the use of column experiments. The design parameters, column dimensions, inflow, diesel concentration, dissolved oxygen, bacterial growth, and monitoring was defined. Bioaugmentation was performed inoculating a bacterial consortium produced by the ICP. The experimental setup was assembled in triplicate and was monitored through a period of four months. The experimental results showed that Bioventing technique was the most effective, reaching up to 97% diesel removal from the contaminated soil; with the Bioaugmentation - Bioventing, diesel fuel removal percentage was 75%, and the Natural Attenuation and Bioaugmentation techniques resulted in diesel fuel removal percentages not greater than 48%. This study showed that the microbial consortium evaluated and provided by the Colombian Petroleum Institute proved to be not efficient for potentializing bioremediation processes of sandy soils contaminated with diesel fuel.

  18. PART I: Bioventing Pilot Test Work Plan for Fire Protection Training Area Site FY-03, Charleston AFB, South Carolina. PART II: Draft Interim Pilot Test Results Report for Fire Protection Training Area Site FT-03, Charleston AFB, South Carolina

    National Research Council Canada - National Science Library

    1993-01-01

    This site-specific work plan presents the scope of a bioventing pilot test for in situ treatment of fuel contaminated soils at the Fire Protection Training Area designated as Site FT-O3, Charleston Air Force Base (AFB), South Carolina...

  19. Bioventing of gasoline-contaminated soil: some questions to be answered

    International Nuclear Information System (INIS)

    Bezerra, S.M.C.; Zytner, R.G.

    2002-01-01

    Underground storage tank (UST) leakage is a big concern in the USA and Canada because gasoline-contaminated soil is a significant source of groundwater contamination. This threat is not confined to North America as locations like Sao Paulo (Brazil) have leakage rates similar to the North American average. The typical in-situ remediation technology used to remediate the contaminated soil is soil vapour extraction (SVE), but once tailing occurs, where the residual gasoline concentration still exceeds clean up levels, SVE becomes ineffective. Bioventing has emerged as one of the most cost-effective technologies currently available to address this tailing in the remediation of petroleum-contaminated sites. Bioventing is a source control treatment, which delivers air and nutrients through injection wells placed in contaminated areas, in order to stimulate the activity of the indigenous microorganisms. However, encouraging laboratory results have not always translated into similar outcomes when implemented in the field. A reason for this inconsistency is the scale-dependent phenomena that influence the bioventing process at the microscale, mesoscale, and macroscale. This paper intends to provide some insights about various research needs in order to improve the bioventing process, specifically related to predicting the time to reach site closure. (author)

  20. 76 FR 60937 - Draft License Renewal Interim Staff Guidance LR-ISG-2011-02; Aging Management Program for Steam...

    Science.gov (United States)

    2011-09-30

    ...-2011-02; Aging Management Program for Steam Generators AGENCY: Nuclear Regulatory Commission. ACTION... License Renewal Interim Staff Guidance (LR-ISG), LR-ISG-2011-02, ``Aging Management Program for Steam... using Revision 3 of NEI 97-06 to manage steam generator aging. The Draft LR-ISG revises the NRC staff's...

  1. Application and performance of remote bioventing systems powered by wind

    International Nuclear Information System (INIS)

    Graves, D.; Hague, K.; Wilson, B.; Dillon, T. Jr.; Klein, J.; McLaughlin, J.; Olson, G.

    1995-01-01

    Wind-powered bioventing systems were designed to operate at remote locations in the absence of electrical power. Laboratory measurements of soil respiration under bioventing conditions indicated the biodegradation of up to 25 mg of weathered diesel per kg of site soil per day. Further testing demonstrated the potential for harnessing wind-power to stimulate air movement through vadose zone soil. A 12-in. attic turbine in a 10-mph wind was found to generate 0.025 in. of water vacuum with an airflow of approximately 2.5 ft 3 per min. Two wind-powered bioventing systems were installed near Nome, Alaska. In situ respiration tests and soil gas composition measurements indicated that the systems were capable of aerating the soil. Measurements of diesel-range organics (DRO) taken during installation and at the end of the treatment season show concentration reductions of 29 and 87% at the two sites

  2. Two US EPA bioremediation field initiative studies: Evaluation of in-situ bioventing

    International Nuclear Information System (INIS)

    Sayles, G.D.; Brenner, R.C.; Hinchee, R.E.; Vogel, C.M.; Miller, R.N.

    1992-01-01

    Bioventing is the process of supplying oxygen in-situ to oxygen-deprived soil microbes by forcing air through contaminated soil at low air flow rates. Unlike soil venting or soil vacuum extraction technologies, bioventing attempts to stimulate biodegradative activity while minimizing stripping of volatile organics. The process destroys the toxic compounds in the ground. Bioventing technology is especially valuable for treating contaminated soils in areas where structures and utilities cannot be disturbed because the equipment needed (air injection/withdrawal wells, air blower, and soil gas monitoring wells) is relatively non-invasive. The US EPA Risk Reduction Engineering Laboratory, with resources from the US EPA Bioremediation Field Initiative, began two parallel 2-year field studies of in-situ of 1991 in collaboration with the US Air Force. The field sites are located at Eielson Air Force Base (AFB) near Fairbanks, Alaska, and Hill AFB near Salt Lake City, Utah. Each site has jet fuel JP-4 contaminated unsaturated soil where a spill has occurred in association with a fuel distribution network. With the pilot-scale experience gained in these studies and others, bioventing should be available in the very near future as an inexpensive, unobtrusive means of treating large quantities of organically contaminated soils. 5 figs

  3. Bioventing feasibility test to aid remediation strategy

    CSIR Research Space (South Africa)

    Pearce, K

    1998-01-01

    Full Text Available A case study is presented where the feasibility of bioventing was assessed for the remediation of a petroleum-contaminated site. This was achieved through the determination of the radius of influence of a single vent well, the soil gas permeability...

  4. Installation of a bio-venting remediation system using directionally drilled horizontal wells

    International Nuclear Information System (INIS)

    Hardy, L.; Stolz, A.P.

    1997-01-01

    The installation of a remediation system for off-site contamination was discussed. The site was contaminated with gasoline and diesel from an abandoned bulk fuel storage and distribution terminal located near a highway. The dissolved phase hydrocarbon plume extended beneath several houses down gradient of the site. Bioventing was considered to be the only remediation option to recover the liquid phase hydrocarbons beneath the highway in a way that would satisfy all the clean-up objectives and the design constraints. Bioventing is closely related to soil vapour extraction (SVE). The main difference is that in bioventing, the mechanism for removal of contaminants is bio-degradation by indigenous bacteria, whereas in SVE, contaminants are simply removed by volatilization. Bioventing systems enhance the activity of the indigenous bacteria by inducing air flow in the subsurface through the use of vapour injection or extraction wells. Two horizontal vapour extraction wells were installed with a directional drill. A soil pile was utilized as a bio-filter for the extracted hydrocarbon vapours and a backfilled trench was used to inject vapours recovered from the soil pile to the subsurface. The total mass of hydrocarbons degraded by this system in 230 days was estimated to be 1,000 kg. It was concluded that under appropriate conditions the in-situ treatment of contaminated soil using directionally drilled wells can be justified on both economic and technical grounds. 3 refs., 1 tab., 5 figs

  5. Bioventing in the subarctic: Field scale implementation of soil heating to allow in situ vadose zone biodegradation throughout the year

    International Nuclear Information System (INIS)

    Oram, D.E.; Winters, A.T.; Winsor, T.R.

    1994-01-01

    Bioventing is a technique of in situ bioremediation of contaminants in unsaturated zone soils that has advantages over other technologies such as soil vapor extraction. At locations where off-gas treatment would be required, bioventing can be a more cost-effective method of remediation. Using bioventing to remediate petroleum hydrocarbons in the vadose zone soils in extremely cold climates may be augmented by heating the subsurface soils. The US Air Force has conducted a bioventing feasibility study at Eielson Air Force Base since 1991. The feasibility study evaluated different methods of heating soils to maintain biodegradation rates through the winter. Results from this study were used to optimize the design of a full-scale bioventing system that incorporated a soil heating system. The system installed consists of the typical components of a bioventing system including an air injection blower, a system to distribute air in the vadose zone, and a monitoring system. To maintain biodegradation at a constant rate throughout the year, soil heating and temperature monitoring systems were also installed. Results to date indicate that summer soil temperatures and biodegradation of hydrocarbons have been maintained through the winter

  6. Bioventing - a new twist on soil vapor remediation of the vadose zone and shallow ground water

    International Nuclear Information System (INIS)

    Yancheski, T.B.; McFarland, M.A.

    1992-01-01

    Bioventing, which is a combination of soil vapor remediation and bioremediation techniques, may be an innovative, cost-effective, and efficient remedial technology for addressing petroleum contamination in the vadose zone and shallow ground water. The objective of bioventing is to mobilize petroleum compounds from the soil and ground water into soil vapor using soil vapor extraction and injection technology, and to promote the migration of the soil vapor upward to the turf root zone for degradation by active near-surface microbiological activity. Promoting and maintaining optimum microbiological activity in the turf root rhizosphere is a key component to the bioventing technique. Preliminary ongoing USEPA bioventing pilot studies (Kampbell, 1991) have indicated that this technique is a promising remediation technology, although feasibility studies are not yet complete. However, based on the preliminary data, it appears that proper bioventing design and implementation will result in substantial reductions of petroleum compounds in the capillary zone and shallow ground water, complete degradation of petroleum compounds in the turf root zone, and no surface emissions. A bioventing system was installed at a site in southern Delaware with multiple leaking underground storage tanks in early 1992 to remediate vadose zone and shallow ground-water contaminated by petroleum compounds. The system consists of a series of soil vapor extraction and soil vapor/atmospheric air injection points placed in various contamination areas and a central core remediation area (a large grassy plot). This system was chosen for this site because it was least costly to implement and operate as compared to other remedial alternatives (soil vapor extraction with carbon or catalytic oxidation of off-gas treatment, insitu bioremediation, etc.), and results in the generation of no additional wastes

  7. Soil Vapor Extraction and Bioventing Test Work Plan for the MOGAS Site, Myrtle Beach Air Force Base, South Carolina

    National Research Council Canada - National Science Library

    1995-01-01

    This work plan presents an evaluation of soil vapor extraction (SVE) and bioventing, and describes the SVE pilot scale and bioventing activities to be conducted to extract and treat soil gas at Installation Restoration Program (IRP...

  8. Bioventing at a heating oil spill site in Yellowknife, Northwest Territories

    International Nuclear Information System (INIS)

    Barnette, M.; Das, D.; Clark, J.; Ziervogel, H.; Hayden, K.

    2005-01-01

    This paper discusses the application of a bioventing system used to treat soil and groundwater contaminated with diesel at a commercial property in Yellowknife. Contamination was caused by a broken pipe connected to an underground storage tank. A bioventing trial was proposed as the most economical method of remediating residual contamination following several years of product recovery. A background of earlier phased product recovery methods was provided. Sufficient heliotrophic bacteria was present in the groundwater for aerobic bioremediation of the petroleum hydrocarbon impacted soil and groundwater. Details of monitoring wells and recovery rates were presented, as well as installation procedures for the bioventing system, which included 3 air injection wells, 6 vadose zone observation wells and a blower fan with associated piping to blow air into the subsurface. The system operated for 12 days to establish subsurface conditions and evaluate effectiveness, and was subsequently used for various periods of duration from 2002 to 2004. Results for all periods of operation were provided. It was concluded that the system was effective in increasing subsurface oxygen concentrations to stimulate microbial bioremediation in the vadose zone soil. Estimated remediation time ranged from 3 to 5 years. The radius of influence of the system was in excess of 29 m. Changes in the water table meant that wells initially thought to be free of hydrocarbons became recontaminated. Further operations and monitoring of the bioventing system were recommended, including soil sampling to determine concentrations of hydrocarbons remaining at the site in comparison to other soil criteria. Monitoring costs were estimated at $10,000 per year. It was suggested that there was a potential for the application of this system in other northern contaminated areas. 3 figs

  9. Remediation of petroleum contaminated soils through bioventing in cold regions

    International Nuclear Information System (INIS)

    Brar, G.S.; Currier, P.M.; Reynolds, C.M.; Millhouse, J.B.

    1994-01-01

    Petroleum contaminated soils are found in many remote sites in Alaska where releases from bulk storage of fuel oil for heat and power generation have occurred. Bioventing, a process in which petroleum degradation by indigenous aerobic bacteria is enhanced by supplying oxygen and nutrients, may be a viable treatment technique for soils at remote sites if limitations due to low temperatures can be overcome. The objectives of this study were to: (1) test a design for ex-situ bioventing in cold regions, (2) evaluate biodegradation rates at low temperatures, and (3) determine the effects of applied nutrients on low-temperature biodegradation. Two aerated biopit remediation cells were constructed to treat previously excavated soils at Eareckson Air Force Station, Shemya, Alaska. Experimental treatments consisted of a fertilized pile (FP) and a nonfertilized pile (NFP). Hourly soil and air temperature data at 4 depths were recorded at 4 locations in each biopit. During 148 days of remediation, mean temperature ranged from -3 to 6 C for air at 100 cm. above the piles. The mean concentrations of TPH and DRO decreased from an initial 1,304 and 982 mg/kg of 139 and 82 mg/kg, respectively, with the FP, and 422 and 294 mg/kg with the NFP in 115 days. Cumulative degradation rates of TPH and DRO are significantly (P 2 = 0.94 for TPH. 0.93 for DRO). Pit bioventing technology was shown to be efficient, fast, and cost-effective in cold regions where temperature during winter months is a major constraint for the remediation of contaminated soils

  10. 78 FR 49782 - Interim Staff Guidance on Changes During Construction

    Science.gov (United States)

    2013-08-15

    ... Construction AGENCY: Nuclear Regulatory Commission. ACTION: Draft interim staff guidance; request for comment... During Construction.'' This ISG provides guidance to the NRC staff on the Preliminary Amendment Request...-ISG-025 ``Interim Staff Guidance on Changes during Construction under 10 CFR Part 52'' is available...

  11. Hydrazine blending and storage facility, interim response action, draft implementation document for rinsewater transfer, phase 2

    Energy Technology Data Exchange (ETDEWEB)

    1991-08-09

    This Draft Implementation Document (ID) for Rinsewater Transfer has been prepared as a requirement for conducting and completing the Interim Response Action (IRA) at the Hydrazine Blending and Storage Facility (HBSF) located at Rocky Mountain Arsenal (RMA) in Commerce City, Colorado. This document has been prepared in accordance with requirements set forth in the October 1988 Final Decision Document for the HBSF IRA (Peer, 1988) and the Amendment to the Final Decision Document (HLA, 1991). The HBSF IRA task was separated into two phases that comprise complete decommissioning of the HBSF as cited in the Federal Facility Agreement. The design portion of Phase I of the HBSF IRA included analytical methods development and laboratory certification for analysis of hydrazine fuel compounds (hydrazine, monomethyl hydrazine) (MMH), and unsymmetrical dimethyl hydrazine (UDMH) and n-nitrosodimethylamine (NDMA) in HBSF rinsewater, chemical characterization of hydrazine rinsewater, bench- and pilot-scale testing of ultraviolet (UV) light/chemical oxidation treatment systems for treatment of hydrazine rinsewater, full-scale startup testing of a UV light/chemical oxidation treatment system, and air monitoring during startup testing as described in the Draft Final Treatment Report (HLA, 1991).

  12. Long-term bioventing performance in low-permeability soils

    International Nuclear Information System (INIS)

    Phelps, M.B.; Stanin, F.T.; Downey, D.C.

    1995-01-01

    Short-term and long-term bioventing treatability testing has shown that in situ air injection and extraction is a practical method for sustaining increased oxygen levels and enhancing aerobic biodegradation of petroleum hydrocarbons in low-permeability soils. At several test sites, initial physical parameter analysis of soils and air permeability tests indicated that impacted soils (fine sandy silts and clays) had low air permeabilities. Measurements of depleted soil-gas oxygen levels and increased soil-gas carbon dioxide levels indicated that the natural process of aerobic biodegradation of petroleum hydrocarbons was oxygen-limited. Initial treatability testing consisted of air permeability tests to measure the permeability of the soils to air and in situ respiration tests to measure the rates at which native microorganisms could biodegrade the contaminants when provided with sufficient oxygen. During the long-term treatment period, active air injection or extraction systems were operated for 1 year or longer. Soil gas was periodically monitored within the treatment zone to evaluate the success of the bioventing systems in increasing soil-gas oxygen levels in the low-permeability soils. Follow-up respiration tests and soil and soil-gas sampling were conducted to evaluate changes in respiration rates and contaminant concentrations with time

  13. Nutrient demand in bioventing of fuel oil pollution

    International Nuclear Information System (INIS)

    Breedveld, G.D.; Hauge, A.; Olstad, G.

    1995-01-01

    The effect of nutrient addition on bioventing of fuel oil pollution in an artificially polluted sandy soil has been studied at different experimental scales to assess the predictive value of laboratory treatability studies. The results of batch studies, laboratory column studies, and pilot-scale field tests (10 tons of soil) were compared. The qualitative response to nutrient addition was comparable in all experiments. Without nutrient addition, a minimal respiration rate was observed. With nutrient addition, respiration rates increased almost instantaneously. The highest rates were observed in the batch studies. The column study and pilot-scale field test indicated similar respiration rates, at approximately one sixth the respiration rates in the batch study. Respiration rates in the pilot-scale field study decreased during the winter season. Analysis of the residual oil composition in soil samples showed a relation between the degree of weathering, measured as the n-C 17 /pristane and n-C 18 /phytane ratio, and nutrient addition. Lower n-C 17 /pristane ratios were observed at higher total nitrogen content. After 1 year of bioventing with nutrient addition, a 66% reduction in TPH content was observed. Without nutrient addition, the residual oil still closely resembled the original fuel oil product, with only minor removal of the light-end compounds

  14. Soil moisture effects during bioventing in fuel-contaminated arid soils

    International Nuclear Information System (INIS)

    Zwick, T.C.; Leeson, A.; Hinchee, R.E.; Hoeppel, R.E.; Bowling, L.

    1995-01-01

    This study evaluated the effects of soil moisture addition on microbial activity during bioventing of dry, sandy soils at the Marine Corps Air Ground Combat Center (MCAGCC), Twentynine Palms, California. Soils at the site have been contaminated to a depth of approximately 80 ft (24 m) with gasoline, JP-5 jet fuel, and diesel fuel. Based on the low soil moisture measured at the site (2 to 3% by weight), it was determined that soil moisture may be limiting biodegradation. To evaluate the effect that moisture addition had on microbial activity under field conditions, a subsurface drip irrigation system was installed above the fuel hydrocarbon plume. Irrigation water was obtained from two monitoring wells on the site, where groundwater was approximately 192 ft (59 m) below ground surface. Advancement of the wetting front was monitored. In situ respiration rates increased significantly after moisture addition. The results of this study provide evidence for the potential applicability of moisture addition in conjunction with bioventing for site remediation in arid environments. Further work is planned to investigate optimization of moisture addition

  15. Benzene, toluene and p-xylene interactions and the role of microbial communities in remediation using bioventing

    Energy Technology Data Exchange (ETDEWEB)

    Sui, H. [Tianjin Univ., Tianjin (China). School of Chemical Engineering and Technology; Tianjin Univ., Tianjin (China). National Engineering Research Center for Distillation Technology; Li, X.G.; Jiang, B. [Tianjin Univ., Tianjin (China). National Engineering Research Center for Distillation Technology

    2005-04-01

    Bioventing is a promising in-situ soil remediation technology used to clean soils and groundwater contaminated by aromatic hydrocarbon components benzene, toluene and xylene (BTX). These contaminants are present at numerous hazardous waste sites. Bioventing provides enough oxygen to stimulate aerobic biodegradation by indigenous microorganisms. It is not constrained by contaminant volatility and can therefore be applied to contaminants that are readily biodegradable even if they are not highly volatile. This study examined the volatilization and biodegradation of BTX during bioventing from unsaturated soil. It focused on the occurrence of any substrate interaction and the effects of indigenous microbial inocula. The soil was inoculated with indigenous microorganisms obtained from the Dagang Oil Field in Tianjin, China. Then, different amounts of BTX were added to the soil in a stainless steel column through which carbon dioxide free air and pure nitrogen flowed. The volatilization-to-biodegradation ratios of BTX were 6:1, 2:1 and 2:1 respectively. After 3 weeks, the final concentration in the soil gas was 0.128 mg/L benzene, 0.377 mg/L toluene and 0.143 mg/L xylene. The substrate interactions that occurred were as follows: benzene and xylene degradation was accelerated while toluene was being degraded; and, the presence of xylene increased the lag period for benzene degradation. It was concluded that bioventing is an effective remediation technology for aromatic hydrocarbons and can significantly reduce the remediation time if target residual BTX concentration of 0.1 mg/L is to be reached. BTX removal becomes more significant with time, particularly when soils are inoculated with indigenous microbial communities from contaminated soil. 22 refs., 5 tabs., 7 figs.

  16. Operations and Maintenance Manual for Expanded Bioventing System Site FC-2 Kelly AFB, Texas

    National Research Council Canada - National Science Library

    1996-01-01

    This Operations and Maintenance Manual has been created as a guide for monitoring and maintaining the performance of the bioventing blower and vent well plumbing at the Fire Training Area (Site FC-2...

  17. Nitrogen fate model for gas-phase ammonia-enhanced in situ bioventing

    International Nuclear Information System (INIS)

    Marshall, T.R.

    1995-01-01

    Subsurface bioremediation of contaminants is sometimes limited by the availability of nitrogen. Introduction of gaseous ammonia to the subsurface is a feasible and economical approach to enhance biodegradation in some environments. A gaseous nutrient source may be a practical option for sites where surface application of liquid nutrients is not possible, such as sites with shallow groundwater or sites with surface operations. A conceptual nitrogen fate model was developed to provide remediation scientists and engineers with some practical guidelines in the use of ammonia-enhanced bioventing. Ammonia supplied to the subsurface dissolves readily in soil moisture and sorbs strongly to soil particles. The ammonium ion is the preferred nutrient form of many microorganisms. Some of the ammonia will be converted to nitrate by ammonia-oxidizing organisms. Field monitoring data from an operating ammonia-enhanced bioventing remediation site for diesel fuel contamination are presented. Conservative additions of ammonia promoted appreciable increases in evolved carbon dioxide and rate of oxygen utilization. An overabundance of added ammonia promoted formation of methane from likely anaerobic hydrocarbon degradation in the presence of nitrate as the electron acceptor

  18. Bioventing feasibility study of low permeability soils for remediation of petroleum contamination

    International Nuclear Information System (INIS)

    Brackney, K.M.

    1994-01-01

    A site characterization of leaking underground gasoline and diesel storage tanks at the University of Idaho, West Farm Operations Center, identified approximately 800 cubic yards of petroleum-contaminated soil exceedingly regulatory action limits of 100 ppm TPH. Bioventing, a combination of in situ soil vapor extraction and microbial degradation, was selected as a remedial alternative on the basis of the presumably unsaturated paleo-soil with a 45-foot depth to groundwater, and a microbial study which concluded that indigenous petroleum-degrading microorganisms existed throughout the contamination. Soil vapor extraction tests were conducted by applying a 60-inch water column vacuum to a soil vapor extraction well and monitoring pneumatic pressure drawdown in 12 adjacent pneumatic piezometers and vertically distributed piezometer clusters. Pressure drawdown vs time data plots indicated that air permeability is inadequate everywhere at the site except at 20 feet below ground surface. Low soil permeability creates conditions for a perched water table that was documented during the investigation, resulting in unsatisfactory conditions for in situ bioventing. 8 refs., 14 figs

  19. Remedial Action Plan for Expanded Bioventing System Buildings 2034/2035, Fairchild Air Force Base, Washington

    National Research Council Canada - National Science Library

    1996-01-01

    This remedial action plan (RAP) presents the scope for an expanded bioventing system for in situ treatment of fuel-contaminated soils in the vicinity of Buildings 2034 and 2035 at Fairchild Air Force Base (AFB), Washington...

  20. Corrective Action Plan for Expanded Bioventing System Site FT-03, Charleston Air Force Base, South Carolina

    National Research Council Canada - National Science Library

    1996-01-01

    .... The primary objectives of the bioventing system upgrade are to: ̂ Deliver oxygen to additional areas of the site that have subsurface soils contaminated with fuel hydrocarbons that did not receive...

  1. Evaluación de las técnicas de atenuación natural, bioventing, bioaumentación y bioaumentación- bioventing, para la biodegradación de diésel en un suelo arenoso, en experimentos en columna

    Directory of Open Access Journals (Sweden)

    Angélica María Muskus Morales

    2013-08-01

    Full Text Available El presente estudio fue desarrollado dentro del convenio de cooperación institucional realizado entre laUniversidad Pontifi cia Bolivariana, Seccional Bucaramanga y el Instituto Colombiano de Petróleos – ICP, con el fi nde dar solución a una problemática que se presenta en las zonas de manejo de hidrocarburos, donde se evidenciansuelos arenosos contaminados con diésel hasta concentraciones del 6% y a una profundidad máxima de 80 cm.Para el desarrollo metodológico se contaminó un suelo artifi cialmente con diésel para evaluar las técnicas deBioventing, Atenuación Natural, Bioaumentación y Bioventing-Bioaumentación, utilizando montajes en columnas.Se defi nieron los parámetros de diseño y seguimiento como dimensiones de las columnas, caudal de entrada,concentración de diésel, oxígeno disuelto y crecimiento bacteriano; para la bioaumentación se inoculó el suelocon un consorcio bacteriano producido por el ICP. Se realizaron los montajes experimentales por triplicado y secontroló el proceso durante cuatro meses. Los resultados obtenidos mostraron que en la técnica de Bioventingse obtuvieron porcentajes de remoción de diésel hasta del 97%. Con la técnica de Bioventing-Bioaumentación sealcanzaron porcentajes de remoción hasta del 75% y con las técnicas de Atenuación Natural y Bioaumentación,los porcentajes de remoción no superaron el 48%. El estudio mostró que el consorcio bacteriano utilizado yevaluado mediante las técnicas de Bioaumentación y Bioventing-Bioaumentación, no potencializó la efi cienciade los procesos de biorremediación del suelo arenoso contaminado con diésel.

  2. Initial Remedial Action Plan for Expanded Bioventing System BX Service Station, Patrick Air Force Base, Florida

    National Research Council Canada - National Science Library

    1995-01-01

    This initial remedial action plan presents the scope for an expanded bioventing system for in situ treatment of fuel-contaminated soils at the BX Service Station at Patrick Air Force Base (AFB), Florida...

  3. Corrective Action Plan for Expanded Bioventing System Site FT-03, Charleston Air Force Base, South Carolina

    National Research Council Canada - National Science Library

    1996-01-01

    ... (former Fire Protection Training Area No. 3), Charleston Air Force Base (AFB), South Carolina. A one-year bioventing pilot study previously conducted at this site had successful results in reducing fuel hydrocarbons in soils...

  4. Safe interim storage of Hanford tank wastes, draft environmental impact statement, Hanford Site, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-01

    This Draft EIS is prepared pursuant to the National Environmental Policy Act (NEPA) and the Washington State Environmental Policy Act (SEPA). DOE and Ecology have identified the need to resolve near-term tank safety issues associated with Watchlist tanks as identified pursuant to Public Law (P.L.) 101-510, Section 3137, ``Safety Measures for Waste Tanks at Hanford Nuclear Reservation,`` of the National Defense Authorization Act for Fiscal Year 1991, while continuing to provide safe storage for other Hanford wastes. This would be an interim action pending other actions that could be taken to convert waste to a more stable form based on decisions resulting from the Tank Waste Remediation System (TWRS) EIS. The purpose for this action is to resolve safety issues concerning the generation of unacceptable levels of hydrogen in two Watchlist tanks, 101-SY and 103-SY. Retrieving waste in dilute form from Tanks 101-SY and 103-SY, hydrogen-generating Watchlist double shell tanks (DSTs) in the 200 West Area, and storage in new tanks is the preferred alternative for resolution of the hydrogen safety issues.

  5. Safe interim storage of Hanford tank wastes, draft environmental impact statement, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1994-07-01

    This Draft EIS is prepared pursuant to the National Environmental Policy Act (NEPA) and the Washington State Environmental Policy Act (SEPA). DOE and Ecology have identified the need to resolve near-term tank safety issues associated with Watchlist tanks as identified pursuant to Public Law (P.L.) 101-510, Section 3137, ''Safety Measures for Waste Tanks at Hanford Nuclear Reservation,'' of the National Defense Authorization Act for Fiscal Year 1991, while continuing to provide safe storage for other Hanford wastes. This would be an interim action pending other actions that could be taken to convert waste to a more stable form based on decisions resulting from the Tank Waste Remediation System (TWRS) EIS. The purpose for this action is to resolve safety issues concerning the generation of unacceptable levels of hydrogen in two Watchlist tanks, 101-SY and 103-SY. Retrieving waste in dilute form from Tanks 101-SY and 103-SY, hydrogen-generating Watchlist double shell tanks (DSTs) in the 200 West Area, and storage in new tanks is the preferred alternative for resolution of the hydrogen safety issues

  6. The effect of temperature on the bioventing of soil contaminated with toluene and decane

    NARCIS (Netherlands)

    Malina, G.; Grotenhuis, J.T.C.; Rulkens, W.H.

    1999-01-01

    The effect of temperature on evaporation and biodegradation rates during soil bioventing (SBV) was studied for a mixture of toluene and decane in bench-scale soil columns at a continuous air flow and consecutively at two different flow rates. The effect of temperature on SBV was monitored by GC

  7. BIODEGRADATION OF DIESEL OIL IN SOIL AND ITS ENHANCEMENT BY APPLICATION OF BIOVENTING AND AMENDMENT WITH BREWERY WASTE EFFLUENTS AS BIOSTIMULATION-BIOAUGMENTATION AGENTS

    Directory of Open Access Journals (Sweden)

    Samuel Agarry

    2015-02-01

    Full Text Available The purpose of this study is to investigate and evaluate the effects of natural bioattenuation, bioventing, and brewery waste effluents amendment as biostimulation-bioaugmentation agent on biodegradation of diesel oil in unsaturated soil. A microcosm system was constructed consisting of five plastic buckets containing 1 kg of soil, artificially contaminated or spiked with 10% w/w of diesel oil. Biodegradation was monitored over 28 days by determining the total petroleum hydrocarbon content of the soil and total hydrocarbon degrading bacteria. The results showed that combination of brewery waste effluents amendment and bioventing technique was the most effective, reaching up to 91.5% of diesel removal from contaminated soil; with the brewery waste effluents amendment (biostimulation-bioaugmentation, the percentage of diesel oil removal was 78.7%; with bioventing, diesel oil percentage degradation was 61.7% and the natural bioattenuation technique resulted in diesel oil removal percentage be not higher than 40%. Also, the total hydrocarbon-degrading bacteria (THDB count in all the treatments increased throughout the remediation period. The highest bacterial growth was observed for combined brewery waste effluents amendment with bioventing treatment strategy. A first-order kinetic model was fitted to the biodegradation data to evaluate the biodegradation rate and the corresponding half-life time was estimated. The model revealed that diesel oil contaminated-soil microcosms under combined brewery waste effluents amendment with bioventing treatment strategy had higher biodegradation rate constants, k as well as lower half-life times, t1/2 than other remediation systems. This study showed that the microbial consortium, organic solids, nitrogen and phosphorus present in the brewery waste effluents proved to be efficient as potential biostimulation-bioaugmentation agents for bioremediation processes of soils contaminated with diesel oil

  8. Vapor Extraction/Bioventing Sequential Treatment of Soil Contaminated with Volatile and SemiVolatile Hydrocarbon Mixtures

    NARCIS (Netherlands)

    Malina, G.; Grotenhuis, J.T.C.; Rulkens, W.H.

    2002-01-01

    A cost-effective removal strategy was studied in bench-scale columns that involved vapor extraction and bioventing sequential treatment of toluene- and decane-contaminated soil. The effect of operating mode on treatment performance was examined at a continuous air flow and consecutively at two

  9. Basis for Interim Operation for the K-Reactor in Cold Standby

    Energy Technology Data Exchange (ETDEWEB)

    Shedrow, B.

    1998-10-19

    The Basis for Interim Operation (BIO) document for K Reactor in Cold Standby and the L- and P-Reactor Disassembly Basins was prepared in accordance with the draft DOE standard for BIO preparation (dated October 26, 1993).

  10. Basis for Interim Operation for the K-Reactor in Cold Standby

    International Nuclear Information System (INIS)

    Shedrow, B.

    1998-01-01

    The Basis for Interim Operation (BIO) document for K Reactor in Cold Standby and the L- and P-Reactor Disassembly Basins was prepared in accordance with the draft DOE standard for BIO preparation (dated October 26, 1993)

  11. Enhanced biodegradation of hydrocarbons in-situ via bioventing

    International Nuclear Information System (INIS)

    Newman, B.; Martinson, M.; Smith, G.; McCain, L.

    1993-01-01

    This case study discusses the remediation of soils beneath a former service station impacted with volatile and semi-volatile petroleum compounds. Subsurface investigation revealed hydrocarbon contamination representative of weathered gasoline and diesel fuel in a stratified soil profile consisting of sand and silts. Only unsaturated soils were contaminated with no impact to ground water. A bioventing corrective action approach was selected which included excavation of 6,100 cubic yards of impacted soils with soil mixing to add inorganic nutrients and eliminate soil heterogeneities. Soils were then returned to the excavation after forced-air ventilation lateral lines were installed at the floor of the excavation. Soil vapor concentrations of benzene, toluene, ethylbenzene, xylenes (BTEX) rapidly declined within the first three months of system operation to nondetectable levels

  12. Effects of initial nitrogen addition on deep-soils bioventing at a fuel-contaminated site

    International Nuclear Information System (INIS)

    Ratz, J.W.; Guest, P.R.; Downey, D.C.

    1994-01-01

    A ruptured pipe at a Burlington Northern Railroad (BNRR) fueling pump house resulted in over 60,000 gallons of No. 2 diesel fuel spilling onto the surrounding soil. An initial investigation of site conditions indicated that subsurface soils were contaminated with diesel fuel to ground water, which was observed approximately 70 feet below the ground surface. State regulatory agencies requested that BNRR develop and implement a remedial action plan to treat these diesel-contaminated soils and protect local ground waters. Engineering-Science, Inc. (ES) was retained for this work and, after evaluating a variety of remediation technologies recommended using soil venting methods to enhance the immediate volatilization and long-term biodegradation of fuel residuals. ES designed and implemented a ''bioventing'' pilot test to determine soil properties such as air permeability, and to assess the potential for partial volatilization and long-term biodegradation of diesel fuel residuals at the site. Hydrocarbon concentrations, carbon dioxide, and oxygen levels were monitored at a vapor extraction well (VEW) and six vapor monitoring points (VMPs) to determine the rates of volatilization and biological degradation of fuel residuals. Pilot test results confirmed that full-scale bioventing was feasible for the remediation of this site

  13. 76 FR 11506 - Fisheries and Habitat Conservation and Migratory Birds Programs; Draft Land-Based Wind Energy...

    Science.gov (United States)

    2011-03-02

    ...] RIN 1018-AX45 Fisheries and Habitat Conservation and Migratory Birds Programs; Draft Land-Based Wind... Impacts from Wind Turbines (Interim Guidance). As stated in the notice, the comment period on the draft... Minimizing Wildlife Impacts from Wind Turbines. We expect to issue final Guidelines for public use after...

  14. EPA Releases Draft Policy to Reduce Animal Testing for Skin Sensitization

    Science.gov (United States)

    The document, Draft Interim Science Policy: Use of Alternative Approaches for Skin Sensitization as a Replacement for Laboratory Animal Testing, describes the science behind the non-animal alternatives that can now be used to identify skin sensitization.

  15. Operations and Maintenance Manual for Full-Scale Bioventing System at FSA-1, Air Force Plant 4, Fort Worth, Texas

    National Research Council Canada - National Science Library

    1996-01-01

    This Operations and Maintenance (O&M) Manual has been created as a guide for monitoring and maintaining the performance of the full-scale bioventing blower system and vent well plumbing at FSA-1 at Air Force Plant 4 (AFP4), Texas...

  16. National NIF Diagnostic Program Interim Management Plan

    International Nuclear Information System (INIS)

    Warner, B

    2002-01-01

    The National Ignition Facility (NIF) has the mission of supporting Stockpile Stewardship and Basic Science research in high-energy-density plasmas. To execute those missions, the facility must provide diagnostic instrumentation capable of observing and resolving in time events and radiation emissions characteristic of the plasmas of interest. The diagnostic instrumentation must conform to high standards of operability and reliability within the NIF environment. These exacting standards, together with the facility mission of supporting a diverse user base, has led to the need for a central organization charged with delivering diagnostic capability to the NIF. The National NIF Diagnostics Program (NNDP) has been set up under the aegis of the NIF Director to provide that organization authority and accountability to the wide user community for NIF. The funds necessary to perform the work of developing diagnostics for NIF will be allocated from the National NIF Diagnostics Program to the participating laboratories and organizations. The participating laboratories and organizations will design, build, and commission the diagnostics for NIF. Restricted availability of funding has had an adverse impact, unforeseen at the time of the original decision to projectize NIF Core Diagnostics Systems and Cryogenic Target Handing Systems, on the planning and initiation of these efforts. The purpose of this document is to provide an interim project management plan describing the organizational structure and management processes currently in place for NIF Core Diagnostics Systems. Preparation of a Program Execution Plan for NIF Core Diagnostics Systems has been initiated and a current draft is provided as Attachment 1 to this document. The National NIF Diagnostics Program Interim Management Plan provides a summary of primary design criteria and functional requirements, current organizational structure, tracking and reporting procedures, and current planning estimates of project scope

  17. Respiration testing for bioventing and biosparging remediation of petroleum contaminated soil and ground water

    International Nuclear Information System (INIS)

    Gray, A.L.; Brown, A.; Moore, B.J.; Payne, R.E.

    1996-01-01

    Respiration tests were performed to measure the effect of subsurface aeration on the biodegradation rates of petroleum hydrocarbon contamination in vadose zone soils (bioventing) and ground water (biosparging). The aerobic biodegradation of petroleum contamination is typically limited by the absence of oxygen in the soil and ground water. Therefore, the goal of these bioremediation technologies is to increase the oxygen concentration in the subsurface and thereby enhance the natural aerobic biodegradation of the organic contamination. One case study for biosparging bioremediation testing is presented. At this site atmospheric air was injected into the ground water to increase the dissolved oxygen concentration in the ground water surrounding a well, and to aerate the smear zone above the ground water table. Aeration flow rates of 3 to 8 cfm (0.09 to 0.23 m 3 /min) were sufficient to increase the dissolved oxygen concentration. Petroleum hydrocarbon biodegradation rates of 32 to 47 microg/l/hour were calculated based on measurements of dissolved oxygen concentration in ground water. The results of this test have demonstrated that biosparging enhances the biodegradation of petroleum hydrocarbons, but the results as they apply to remediation are not known. Two case studies for bioventing respiration testing are presented

  18. 78 FR 40199 - Draft Spent Fuel Storage and Transportation Interim Staff Guidance

    Science.gov (United States)

    2013-07-03

    .... ML13056A516. NRC's PDR: You may examine and purchase copies of public documents at the NRC's PDR, Room O1-F21... current or future applicants The NRC staff has no intention to impose the draft ISG positions on existing... of the effective date of this guidance The NRC staff has no intention to impose the draft ISG...

  19. Final Bioventing Pilot Test Work Plan for Base Exchange Service Station Underground Storage Tank Area, Vandenberg Air Force Base, California. Part I

    National Research Council Canada - National Science Library

    1992-01-01

    This pilot test work plan presents the scope of an in situ enhanced biological degradation, or "bioventing", pilot test for treatment of gasoline- contaminated soils at the Base Exchange Service Station (BXSS...

  20. Monitoring biodegradation of diesel fuel in bioventing processes using in situ respiration rate.

    Science.gov (United States)

    Lee, T H; Byun, I G; Kim, Y O; Hwang, I S; Park, T J

    2006-01-01

    An in situ measuring system of respiration rate was applied for monitoring biodegradation of diesel fuel in a bioventing process for bioremediation of diesel contaminated soil. Two laboratory-scale soil columns were packed with 5 kg of soil that was artificially contaminated by diesel fuel as final TPH (total petroleum hydrocarbon) concentration of 8,000 mg/kg soil. Nutrient was added to make a relative concentration of C:N:P = 100:10:1. One soil column was operated with continuous venting mode, and the other one with intermittent (6 h venting/6 h rest) venting mode. On-line O2 and CO2 gas measuring system was applied to measure O2 utilisation and CO2 production during biodegradation of diesel for 5 months. Biodegradation rate of TPH was calculated from respiration rate measured by the on-line gas measuring system. There were no apparent differences between calculated biodegradation rates from two columns with different venting modes. The variation of biodegradation rates corresponded well with trend of the remaining TPH concentrations comparing other biodegradation indicators, such as C17/pristane and C18/phytane ratio, dehydrogenase activity, and the ratio of hydrocarbon utilising bacteria to total heterotrophic bacteria. These results suggested that the on-line measuring system of respiration rate would be applied to monitoring biodegradation rate and to determine the potential applicability of bioventing process for bioremediation of oil contaminated soil.

  1. Development of a road materials database: Interim Report: 1st draft

    CSIR Research Space (South Africa)

    Jones, DJ

    2003-03-01

    Full Text Available The data required for a road materials database has been identified and a basic structure formulated. A set of Excel workbooks and associated worksheets has been developed as a foundation for the database and as an interim means of gathering test...

  2. Final Confirmation Sampling and Analysis Report for the POL Yard, Sites SS-06 and ST-40, Wurtsmith AFB, Michigan

    National Research Council Canada - National Science Library

    1999-01-01

    .... Wurtsmith AFBCA and AFCEE/ERT had no comments on the draft final report. This report represents the final contract deliverable for the AFCEE Extended Bioventing Project at the Wurtsmith AFB POL Yard...

  3. MICHIGAN SOIL VAPOR EXTRACTION REMEDIATION (MISER) MODEL: A COMPUTER PROGRAM TO MODEL SOIL VAPORT EXTRACTION AND BIOVENTING OF ORGANIC MATERIALS IN UNSATURATED GEOLOGICAL MATERIAL

    Science.gov (United States)

    This report describes the formulation, numerical development, and use of a multiphase, multicomponent, biodegradation model designed to simulate physical, chemical, and biological interactions occurring primarily in field scale soil vapor extraction (SVE) and bioventing (B...

  4. Natural bioventing remediation from tidal wave action at a field site

    International Nuclear Information System (INIS)

    Kampbell, D.H.; Kittel, J.A.

    1996-01-01

    A remediation research study has been implemented at a jet fuel spill site on an island airport. A buried pipeline fracture several years ago resulted in a fuel spill exceeding 160,000 gallons. The site hydrogeology is a fragmented coral matrix with fresh water overlying more dense salt water. Water table fluctuations of about two feet occur once every twelve hours from tidal action. The research approach being pursued is to recover free-phase floating petroleum liquid using vacuum-mediated subsurface skimming wells. The vacuum will create an active vadose zone aeration to enhance aerobic biodegradation processes and vaporization of fuel. Once the floating fuel is removed, a natural bioventing action caused by tidal oscillations will complete remediation of the spill site

  5. MICHIGAN SOIL VAPOR EXTRACTION REMEDIATION (MISER) MODEL: A COMPUTER PROGRAM TO MODEL SOIL VAPOR EXTRACTION AND BIOVENTING OF ORGANIC CHEMICALS IN UNSATURATED GEOLOGICAL MATERIAL

    Science.gov (United States)

    Soil vapor extraction (SVE) and bioventing (BV) are proven strategies for remediation of unsaturated zone soils. Mathematical models are powerful tools that can be used to integrate and quantify the interaction of physical, chemical, and biological processes occurring in field sc...

  6. Cold climate bioventing with soil warming in Alaska

    International Nuclear Information System (INIS)

    Sayles, G.D.; Brenner, R.C.; Leeson, A.; Hinchee, R.E.; Vogel, C.M.

    1995-01-01

    In the heart of Alaska, a 3-year field study was conducted of bioventing in conjunction with several soil warming methods. The contamination was JP-4 jet fuel. The soil warming methods evaluated, chosen for their apparent low cost, were (1) application of warm water at a low rate, (2) enhanced solar warming by covering the surface with clear plastic in the summer and covering the surface with insulation in the winter, and (3) buried heat pipe. The warm water and buried heat tape methods performed best, maintaining summer-like 10 to 20 C temperatures in the test plots year round, compared to the temperature of the unheated control plot, which dipped to -1 C in the winter. The solar/insulation warming method showed a modest improvement in temperature over the unheated control test plot. The annual average temperatures of the warm water, heat tape, solar, and control plots were 16.9, 14.5, 6.1, and 3.5 C, respectively. The biodegradation rates, measured by in situ respirometry, were higher in plots with higher temperatures and followed the Arrhenius relationship. Despite the low temperature, significant biodegradation was observed in the unheated plot during the winter

  7. Pilot-scale studies of soil vapor extraction and bioventing for remediation of a gasoline spill at Cameron Station, Alexandria, Virginia

    Energy Technology Data Exchange (ETDEWEB)

    Harrison, W.; Joss, C.J.; Martino, L.E. [and others

    1994-07-01

    Approximately 10,000 gal of spilled gasoline and unknown amounts Of trichloroethylene and benzene were discovered at the US Army`s Cameron Station facility. Because the base is to be closed and turned over to the city of Alexandria in 1995, the Army sought the most rapid and cost-effective means of spill remediation. At the request of the Baltimore District of the US Army Corps of Engineers, Argonne conducted a pilot-scale study to determine the feasibility of vapor extraction and bioventing for resolving remediation problems and to critique a private firm`s vapor-extraction design. Argonne staff, working with academic and private-sector participants, designed and implemented a new systems approach to sampling, analysis and risk assessment. The US Geological Survey`s AIRFLOW model was adapted for the study to simulate the performance of possible remediation designs. A commercial vapor-extraction machine was used to remove nearly 500 gal of gasoline from Argonne-installed horizontal wells. By incorporating numerous design comments from the Argonne project team, field personnel improved the system`s performance. Argonne staff also determined that bioventing stimulated indigenous bacteria to bioremediate the gasoline spin. The Corps of Engineers will use Argonne`s pilot-study approach to evaluate remediation systems at field operation sites in several states.

  8. Uranium exploration of the Colorado Plateau: interim staff report

    International Nuclear Information System (INIS)

    1980-10-01

    This report is an issue of the original draft copy of the Interim Staff Report on Uranium Exploration on the Colorado Plateau, dated June 1951. The original draft copy was only recently located and is being published at this time because of the interest in the contained historical content. The table of contents of this report lists: history of uranium mining; geology; proposed program for the geologic investigations section; general activities of industry and government; and future exploration of sedimentary uranium deposits and anticipated results. Under the proposed program section are: future of the copper-uranium deposits as a source of uranium; uraniferous asphaltite deposits; and commission exploration and future possibilities. The section on general activities of industry and government includes: exploratory and development drilling; field investigations and mapping; early geologic investigations and investigations by the US geological survey; and geophysical exploration. Tables are also presented on: uranium production by districts; US Geological survey drilling statistics; Colorado Exploration Branch drilling statistics; summary of drilling projects; and comparative yearly core-drill statistics on the Colorado Plateau

  9. Interim restorations.

    Science.gov (United States)

    Gratton, David G; Aquilino, Steven A

    2004-04-01

    Interim restorations are a critical component of fixed prosthodontic treatment, biologically and biomechanically. Interim restoration serves an important diagnostic role as a functional and esthetic try-in and as a blueprint for the design of the definitive prosthesis. When selecting materials for any interim restoration, clinicians must consider physical properties, handling properties, patient acceptance, and material cost. Although no single material meets all the requirements and material classification alone of a given product is not a predictor of clinical performance, bis-acryl materials are typically best suited to single-unit restorations, and poly(methylmethacrylate) interim materials are generally ideal for multi-unit, complex, long-term, interim fixed prostheses. As with most dental procedures, the technique used for fabrication has a greater effect on the final result than the specific material chosen.

  10. Electrokinetic enhanced bioventing of gasoline in clayey soil: A case history

    International Nuclear Information System (INIS)

    Loo, W.W.; Wang, I.S.; Fan, J.

    1994-01-01

    This paper presents a case history on the bioventing of gasoline in soil with electrokinetic enhancement. The gasoline in soil was related to a 10,000-gallon underground storage tank spill, San Diego, California. The gasoline soil plume covers an area of about 2,400 square feet and to a depth of about 30 feet. The upper 15 feet of the soil plume consists of highly conductive marine clay. The lower 15 feet of the soil plume consists of dense cemented conglomerate sandstone. The gasoline concentration in the soil plume range from 100 to 2,200 mg/Kg(ppm) and the target cleanup level is below 100 ppm. Total gasoline in soil plume is estimated at about 1,000 pounds of gasoline in about 3,500 tons of soil. The soil remediation effort was completed after about 90 days of treatment. The concentration of gasoline in soil after treatment was way below the proposed cleanup level of less than 100 mg/Kg(ppm). The cost of treatment is about $50 per ton for this advanced soil treatment process which provides a cost effective solution to this soil plume with minimum disruption to business operation at the facility

  11. Demonstrating practical application of soil and groundwater clean-up and recovery technologies at natural gas processing facilities: Bioventing, air sparging and wetlands remediation

    International Nuclear Information System (INIS)

    Moore, B.

    1996-01-01

    This issue of the project newsletter described the nature of bioventing, air sparging and wetland remediation. It reviewed their effectiveness in remediating hydrocarbon contaminated soil above the groundwater surface. Bioventing was described as an effective, low cost treatment in which air is pumped below ground to stimulate indigenous bacteria. The bacteria then use the oxygen to consume the hydrocarbons, converting them to CO 2 and water. Air sparging involves the injection of air below the groundwater surface. As the air rises, hydrocarbons are stripped from the contaminated soil and water. The advantage of air sparging is that it cleans contaminated soil and water from below the groundwater surface. Hydrocarbon contamination of wetlands was described as fairly common. Conventional remediation methods of excavation, trenching, and bellholes to remove contamination often cause extreme harm to the ecosystem. Recent experimental evidence suggests that wetlands may be capable of attenuating contaminated water through natural processes. Four hydrocarbon contaminated wetlands in Alberta are currently under study. Results to date show that peat's high organic content promotes sorption and biodegradation and that some crude oil spills can been resolved by natural processes. It was suggested that assuming peat is present, a good clean-up approach may be to contain the contaminant source, monitor the lateral and vertical extent of contamination, and wait for natural processes to resolve the problem. 3 figs

  12. Draft Transportaion Business Plan

    International Nuclear Information System (INIS)

    1985-08-01

    The Office of Civilian Radioactive Waste Management (OCRWM) is responsible for establishing a transportation system to support shipment of spent fuel and high-level radioactive waste to repositories and storage facilities developed under the Nuclear Waste Policy Act of 1982 (NWPA). An element that assists in fulfilling that responsibility is a business plan for acquiring and operating a transportation system. The Draft Transportation Business Plan is an interim step in the process of procuring the transportation system. It sets the context for business strategy decisions by providing pertinent background information, describing the legislation and policies governing transportation under the NWPA, and with establishing the transportation system. It also serves as an instrument for initiating communication between OCRWM and other interested parties. Included in the docuument are strategies for procuring shipping casks and transportation support services. Additionally, in the spirit of the NWPA directive to utilize the private sector to the maximum extent possible, opportunities for business ventures are obvious throughout the system development cycle

  13. 78 FR 72897 - Draft Guidance for Industry on Interim Product Reporting for Human Drug Compounding Outsourcing...

    Science.gov (United States)

    2013-12-04

    ... reporting of product information by registered outsourcing facilities under section 503B of the FD&C Act... collection techniques, when appropriate, and other forms of information technology. Under the draft guidance... report should include the following information for all drugs compounded by the outsourcing facility...

  14. Periodic Safety Review in Interim Storage Facilities - Current Regulation and Experiences in Germany

    International Nuclear Information System (INIS)

    Neles, Julia Mareike; Schmidt, Gerhard

    2014-01-01

    Periodic safety reviews in nuclear power plants in Germany have been performed since the end of the 1980's as an indirect follow-up of the accident in Chernobyl and, in the meantime, are formally required by law. During this process the guidelines governing this review were developed in stages and reached their final form in 1996. Interim storage facilities and other nuclear facilities at that time were not included, so the guidelines were solely focused on the specific safety issues of nuclear power plants. Following IAEA's recommendations, the Western European Nuclear Regulator Association (WENRA) introduced PSRs in its safety reference levels for storage facilities (current version in WGWD report 2.1 as of Feb 2011: SRLs 59 - 61). Based on these formulations, Germany improved its regulation in 2010 with a recommendation of the Nuclear Waste Management Commission (Entsorgungskommission, ESK), an expert advisory commission for the federal regulatory body BMU. The ESK formulated these detailed requirements in the 'ESK recommendation for guides to the performance of periodic safety reviews for interim storage facilities for irradiated fuel elements and heat-generating radioactive waste'. Before finalization of the guideline a test phase was introduced, aimed to test the new regulation in practice and to later include the lessons learned in the final formulation of the guideline. The two-year test phase started in October 2011 in which the performance of a PSR will be tested at two selected interim storage facilities. Currently these recommendations are discussed with interested/concerned institutions. The results of the test phase shall be considered for improvements of the draft and during the final preparation of guidelines. Currently the PSR for the first ISF is in an advanced stage, the second facility just started the process. Preliminary conclusions from the test phase show that the implementation of the draft guideline requires interpretation. The aim of a

  15. Interim overdentures.

    Science.gov (United States)

    Fenton, A H

    1976-07-01

    The construction of an interim overdenture using existing removable partial dentures with natural tooth crowns and artificial teeth can be a simple and economical method of providing patients with dentures while tissues heal and teeth are prepared and restored. A more definite prognosis for both the patient and his remaining dentition can be established before the final overdenture is completed. The procedures necessary to provide three types of interim overdentures have been outlined. Patients tolerate this method of changing their dentitions extremely well.

  16. 46 CFR 167.55-1 - Draft marks and draft indicating systems.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Draft marks and draft indicating systems. 167.55-1... NAUTICAL SCHOOL SHIPS Special Markings Required § 167.55-1 Draft marks and draft indicating systems. (a... aft to the location of the draft marks, due to a raked stem or cut away skeg, the draft must be...

  17. Radioactive waste interim storage in Germany

    International Nuclear Information System (INIS)

    2015-12-01

    The short summary on the radioactive waste interim storage in Germany covers the following issues: importance of interim storage in the frame of radioactive waste management, responsibilities and regulations, waste forms, storage containers, transport of vitrified high-level radioactive wastes from the reprocessing plants, central interim storage facilities (Gorleben, Ahaus, Nord/Lubmin), local interim storage facilities at nuclear power plant sites, federal state collecting facilities, safety, radiation exposure in Germany.

  18. Interim Storage of Spent Nuclear Fuel before Final Disposal in Germany - Regulator's view

    International Nuclear Information System (INIS)

    Arens, G.; Goetz, Ch.; Geupel, Sandra; Gmal, B.; Mester, W.

    2014-01-01

    For spent nuclear fuel management in Germany the concept of dry interim storage in dual purpose casks before direct disposal is applied. The Federal Office for Radiation Protection (BfS) is the competent authority for licensing of interim storage facilities. The competent authority for surveillance of operation is the responsible authority of the respective federal state (Land). Currently operation licenses for storage facilities have been granted for a storage time of 40 years and are based on safety demonstrations for all safety issues as safe enclosure, shielding, sub-criticality and decay heat removal under consideration of operation conditions. In addition, transportability of the casks for the whole storage period has to be provided. Due to current delay in site selection and exploration of a disposal site, an extension of the storage time beyond 40 years could be needed. This will cause appropriate actions by the licensee and the competent authorities as well. A brief description of the regulatory base of licensing and surveillance of interim storage is given from the regulators view. Furthermore the current planning for final disposal of spent nuclear fuel and high level waste and its interconnections between storage and disposal concepts are shortly explained. Finally the relevant aspects for licensing of extended storage time beyond 40 years will be discussed. Current activities on this issue, which have been initiated by the Federal Government, will be addressed. On the regulatory side a review and amendment of the safety guideline for interim storage of spent fuel has been performed and the procedure of periodic safety review is being implemented. A guideline for implementing an ageing management programme is available in a draft version. Regarding safety of long term storage a study focussing on the identification and evaluation of long term effects as well as gaps of knowledge has been finished in 2010. A continuation and update is currently underway

  19. National Ignition Facility Cryogenic Target Systems Interim Management Plan

    International Nuclear Information System (INIS)

    Warner, B

    2002-01-01

    Restricted availability of funding has had an adverse impact, unforeseen at the time of the original decision to projectize the National Ignition Facility (NIF) Cryogenic Target Handling Systems (NCTS) Program, on the planning and initiation of these efforts. The purpose of this document is to provide an interim project management plan describing the organizational structure and management processes currently in place for NCTS. Preparation of a Program Execution Plan (PEP) for NCTS has been initiated, and a current draft is provided as Attachment 1 to this document. The National Ignition Facility is a multi-megajoule laser facility being constructed at Lawrence Livermore National Laboratory (LLNL) by the National Nuclear Security Administration (NNSA) in the Department of Energy (DOE). Its primary mission is to support the Stockpile Stewardship Program (SSP) by performing experiments studying weapons physics, including fusion ignition. NIF also supports the missions of weapons effects, inertial fusion energy, and basic science in high-energy-density physics. NIF will be operated by LLNL under contract to the University of California (UC) as a national user facility. NIF is a low-hazard, radiological facility, and its operation will meet all applicable federal, state, and local Environmental Safety and Health (ES and H) requirements. The NCTS Interim Management Plan provides a summary of primary design criteria and functional requirements, current organizational structure, tracking and reporting procedures, and current planning estimates of project scope, cost, and schedule. The NIF Director controls the NIF Cryogenic Target Systems Interim Management Plan. Overall scope content and execution schedules for the High Energy Density Physics Campaign (SSP Campaign 10) are currently undergoing rebaselining and will be brought into alignment with resources expected to be available throughout the NNSA Future Years National Security Plan (FYNSP). The revised schedule for

  20. Introducing Systematic Aging Management for Interim Storage Facilities in Germany

    International Nuclear Information System (INIS)

    Spieth-Achtnich, Angelika; Schmidt, Gerhard

    2014-01-01

    In Germany twelve at-reactor and three central (away from reactor) dry storage facilities are in operation, where the fuel is stored in combined transport-and-storage casks. The safety of the storage casks and facilities has been approved and is licensed for up to 40 years operating time. If the availability of a final disposal facility for the stored wastes (spent fuel and high-level wastes from reprocessing) will be further delayed the renewal of the licenses can become necessary in future. Since 2001 Germany had a regulatory guideline for at-reactor dry interim storage of spent fuel. In this guideline some elements of ageing were implemented, but no systematic approach was made for a state-of-the-art ageing management. Currently the guideline is updated to include all kind of storage facilities (central storages as well) and all kinds of high level waste (also waste from reprocessing). Draft versions of the update are under discussion. In these drafts a systematic ageing management is seen as an instrument to upgrade the available technical knowledge base for possible later regulatory decisions, should it be necessary to prolong storage periods to beyond the currently approved limits. It is further recognized as an instrument to prevent from possible and currently unrecognized ageing mechanisms. The generation of information on ageing can be an important basis for the necessary safety-relevant verifications for long term storage. For the first time, the demands for a systematic monitoring of ageing processes for all safety-related components of the storage system are described. In addition, for inaccessible container components such as the seal system, the neutron shielding, the baskets and the waste inventory, the development of a monitoring program is recommended. The working draft to the revised guideline also contains recommendations on non-technical ageing issues such as the long-term preservation of knowledge, long term personnel planning and long term

  1. 7 CFR 1738.21 - Interim financing.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Interim financing. 1738.21 Section 1738.21... Interim financing. (a) Upon notification by RUS that an applicant's application is considered complete, the applicant may enter into an interim financing agreement with a lender other than RUS or use its...

  2. 7 CFR 1735.75 - Interim financing.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Interim financing. 1735.75 Section 1735.75... Involving Loan Funds § 1735.75 Interim financing. (a) A borrower may submit a written request for RUS approval of interim financing if it is necessary to close an acquisition before the loan to finance the...

  3. 340 Waste Handling Facility interim safety basis

    International Nuclear Information System (INIS)

    Bendixsen, R.B.

    1995-01-01

    This document establishes the interim safety basis (ISB) for the 340 Waste Handling Facility (340 Facility). An ISB is a documented safety basis that provides a justification for the continued operation of the facility until an upgraded final safety analysis report is prepared that complies with US Department of Energy (DOE) Order 5480.23, Nuclear Safety Analysis Reports. The ISB for the 340 Facility documents the current design and operation of the facility. The 340 Facility ISB (ISB-003) is based on a facility walkdown and review of the design and operation of the facility, as described in the existing safety documentation. The safety documents reviewed, to develop ISB-003, include the following: OSD-SW-153-0001, Operating Specification Document for the 340 Waste Handling Facility (WHC 1990); OSR-SW-152-00003, Operating Limits for the 340 Waste Handling Facility (WHC 1989); SD-RE-SAP-013, Safety Analysis Report for Packaging, Railroad Liquid Waste Tank Cars (Mercado 1993); SD-WM-TM-001, Safety Assessment Document for the 340 Waste Handling Facility (Berneski 1994a); SD-WM-SEL-016, 340 Facility Safety Equipment List (Berneski 1992); and 340 Complex Fire Hazard Analysis, Draft (Hughes Assoc. Inc. 1994)

  4. 13 CFR 120.890 - Source of interim financing.

    Science.gov (United States)

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Source of interim financing. 120... Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may use interim financing for all Project costs except the Borrower's contribution. Any source (including...

  5. Interim report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1985-06-01

    This Interim Report summarizes the research and development activities of the Superconducting Super Collider project carried out from the completion of the Reference Designs Study (May 1984) to June 1985. It was prepared by the SSC Central Design Group in draft form on the occasion of the DOE Annual Review, June 19--21, 1985. Now largely organized by CDG Divisions, the bulk of each chapter documents the progress and accomplishments to date, while the final section(s) describe plans for future work. Chapter 1, Introduction, provides a basic brief description of the SSC, its physics justification, its origins, and the R&D organization set up to carry out the work. Chapter 2 gives a summary of the main results of the R&D program, the tasks assigned to the four magnet R&D centers, and an overview of the future plans. The reader wishing a quick look at the SSC Phase I effort can skim Chapter 1 and read Chapter 2. Subsequent chapters discuss in more detail the activities on accelerator physics, accelerator systems, magnets and cryostats, injector, detector R&D, conventional facilities, and project planning and management. The magnet chapter (5) documents in text and photographs the impressive progress in successful construction of many model magnets, the development of cryostats with low heat leaks, and the improvement in current-carrying capacity of superconducting strand. Chapter 9 contains the budgets and schedules of the COG Divisions, the overall R&D program, including the laboratories, and also preliminary projections for construction. Appendices provide information on the various panels, task forces and workshops held by the CDG in FY 1985, a bibliography of COG and Laboratory reports on SSC and SSC-related work, and on private industrial involvement in the project.

  6. Computer Assisted Drafting (CNC) Drawings. Drafting Module 6. Instructor's Guide.

    Science.gov (United States)

    Missouri Univ., Columbia. Instructional Materials Lab.

    This Missouri Vocational Instruction Management System instructor's drafting guide has been keyed to the drafting competency profile developed by state industry and education professionals. This unit contains information on computer-assisted drafting drawings. The guide contains a cross-reference table of instructional materials and 20 worksheets.…

  7. Burn site groundwater interim measures work plan.

    Energy Technology Data Exchange (ETDEWEB)

    Witt, Jonathan L. (North Wind, Inc., Idaho Falls, ID); Hall, Kevin A. (North Wind, Inc., Idaho Falls, ID)

    2005-05-01

    This Work Plan identifies and outlines interim measures to address nitrate contamination in groundwater at the Burn Site, Sandia National Laboratories/New Mexico. The New Mexico Environment Department has required implementation of interim measures for nitrate-contaminated groundwater at the Burn Site. The purpose of interim measures is to prevent human or environmental exposure to nitrate-contaminated groundwater originating from the Burn Site. This Work Plan details a summary of current information about the Burn Site, interim measures activities for stabilization, and project management responsibilities to accomplish this purpose.

  8. 24 CFR 35.1330 - Interim controls.

    Science.gov (United States)

    2010-04-01

    ... Lead-Paint Hazard Evaluation and Hazard Reduction Activities § 35.1330 Interim controls. Interim..., cleanable covering or coating, such as metal coil stock, plastic, polyurethane, or linoleum. (3) Surfaces...

  9. Solid waste burial grounds interim safety analysis

    International Nuclear Information System (INIS)

    Saito, G.H.

    1994-01-01

    This Interim Safety Analysis document supports the authorization basis for the interim operation and restrictions on interim operations for the near-surface land disposal of solid waste in the Solid Waste Burial Grounds. The Solid Waste Burial Grounds Interim Safety Basis supports the upgrade progress for the safety analysis report and the technical safety requirements for the operations in the Solid Waste Burial Grounds. Accident safety analysis scenarios have been analyzed based on the significant events identified in the preliminary hazards analysis. The interim safety analysis provides an evaluation of the operations in the Solid Waste Burial Grounds to determine if the radiological and hazardous material exposures will be acceptable from an overall health and safety standpoint to the worker, the onsite personnel, the public, and the environment

  10. Solid waste burial grounds interim safety analysis

    Energy Technology Data Exchange (ETDEWEB)

    Saito, G.H.

    1994-10-01

    This Interim Safety Analysis document supports the authorization basis for the interim operation and restrictions on interim operations for the near-surface land disposal of solid waste in the Solid Waste Burial Grounds. The Solid Waste Burial Grounds Interim Safety Basis supports the upgrade progress for the safety analysis report and the technical safety requirements for the operations in the Solid Waste Burial Grounds. Accident safety analysis scenarios have been analyzed based on the significant events identified in the preliminary hazards analysis. The interim safety analysis provides an evaluation of the operations in the Solid Waste Burial Grounds to determine if the radiological and hazardous material exposures will be acceptable from an overall health and safety standpoint to the worker, the onsite personnel, the public, and the environment.

  11. Basic Drafting. Revised.

    Science.gov (United States)

    Schertz, Karen

    This introductory module on drafting includes the technical content and tasks necessary for a student to be employed in an entry-level drafting occupation. The module contains 18 instructional units that cover the following topics: introduction to drafting; tools and equipment; supplies and materials; sketching; scales; drawing format; lettering;…

  12. Draft interim close-out report Fitzner-Eberhardt Arid Lands Ecology Reserve remedial action, Hanford, Washington. Draft A

    International Nuclear Information System (INIS)

    1994-10-01

    The Fitzner-Eberhardt Arid Lands Ecology (ALE) Reserve consists of 120 square miles of shrub-steppe land on the western edge of the Hanford Site. It is located south of Highway 240 and east of the point where the Yakima River borders the site. The land was set aside as a natural research area in 1967 by the Atomic Energy Commission. With the recent change in mission at Hanford from plutonium production to environmental cleanup, much attention has been given to releasing clean tracts of land for other uses. The ALE Reserve is one such tract of land. Consistent with the Record of Decision (ROD) and Preliminary Assessment Screening (PAS), sites identified as having the potential for contamination on the ALE Reserve have been investigated, characterized, and remediated where necessary to comply with MTCA cleanup levels. Hazardous substances released to the environment have either been removed from the site or, in one case when removal was not practical, capped in place. Removal of all of the contaminated soil is supported by the confirmatory sampling results. The existing areas of contamination in the ALE Reserve were considered to be small. In March of 1993, Department of Energy (DOE), the Environmental Protection Agency and the Washington State Department of Ecology signed an Agreement in Principle in which they agreed to expedite cleanup of the ALE Reserve. Cleanup activities and a draft closeout report were to be completed by October 1994. Additionally, DOE proposed to mitigate hazards which may pose a physical threat to wildlife or humans

  13. 76 FR 62087 - Draft Conservation Plan and Draft Environmental Assessment; Dunes Sagebrush Lizard, Texas

    Science.gov (United States)

    2011-10-06

    ...] Draft Conservation Plan and Draft Environmental Assessment; Dunes Sagebrush Lizard, Texas AGENCY: Fish... draft Texas Conservation Plan for the Dunes Sagebrush Lizard (TCP). The draft TCP will function as a... the Applicant for the dunes sagebrush lizard (Sceloporus arenicolus) throughout its range in Texas...

  14. 31 CFR 500.406 - Drafts under irrevocable letters of credit; documentary drafts.

    Science.gov (United States)

    2010-07-01

    ... 31 Money and Finance: Treasury 3 2010-07-01 2010-07-01 false Drafts under irrevocable letters of credit; documentary drafts. 500.406 Section 500.406 Money and Finance: Treasury Regulations Relating to... ASSETS CONTROL REGULATIONS Interpretations § 500.406 Drafts under irrevocable letters of credit...

  15. 31 CFR 515.406 - Drafts under irrevocable letters of credit; documentary drafts.

    Science.gov (United States)

    2010-07-01

    ... 31 Money and Finance: Treasury 3 2010-07-01 2010-07-01 false Drafts under irrevocable letters of credit; documentary drafts. 515.406 Section 515.406 Money and Finance: Treasury Regulations Relating to... CONTROL REGULATIONS Interpretations § 515.406 Drafts under irrevocable letters of credit; documentary...

  16. Interim Administrators in Higher Education: A National Study

    Science.gov (United States)

    Huff, Marie Thielke; Neubrander, Judy

    2015-01-01

    The focus of this paper is on the roles and experiences of interim administrators in higher education. A survey was given to current and recent interim administrators in four-year public universities and colleges across the United States. The goals were to identify the advantages and disadvantages of using and serving as interims, and to solicit…

  17. Waste management system functional requirements for Interim Waste Management Facilities (IWMFs) and technology demonstrations, LLWDDD [Low-Level Disposal Development and Demonstration] Program

    International Nuclear Information System (INIS)

    1988-03-01

    The purpose of this report is to build upon the preceding decisions and body of information to prepare draft system functional requirements for each classification of waste disposal currently proposed for Low-Level Waste Disposal Development Demonstration (LLWDDD) projects. Functional requirements identify specific information and data needs necessary to satisfy engineering design criteria/objectives for Interim Waste Management Facilities. This draft will suppor the alternatives evaluation process and will continue to evolve as strategy is implemented, regulatory limits are established, technical and economic uncertainties are resolved, and waste management plans are being implemented. This document will become the planning basis for the new generation of solid LLW management facilities on new sites on the Reservation. Eighteen (18) general system requirements are identified which are applicable to all four Low-Level Waste (LLW) disposal classifications. Each classification of LLW disposal is individually addressed with respect ot waste characteristics, site considerations, facility operations, facility closure/post-closure, intruder barriers, institutional control, and performance monitoring requirements. Three initial LLW disposal sites have been proposed as locations on the ORR for the first demonstrations

  18. Subsurface Interim Measures/Interim Remedial Action Plan/Environmental Assessment and Decision Document, Operable Unit No. 2

    International Nuclear Information System (INIS)

    1992-01-01

    The subject Interim Measures/Interim Remedial Action plan/Environmental Assessment (IM/IRAP/EA) addresses residual free-phase volatile organic compound (VOC) contamination suspected in the subsurface within an area identified as Operable Unit No. 2 (OU2). This IM/IRAP/EA also addresses radionuclide contamination beneath the 903 Pad at OU2. Although subsurface VOC and radionuclide contamination on represent a source of OU2 ground-water contamination, they pose no immediate threat to public health or the environment. This IM/IRAP/EA identifies and evaluates interim remedial actions for removal of residual free-phase VOC contamination from three different subsurface environments at OU2. The term ''residual'' refers to the non-aqueous phase contamination remaining in the soil matrix (by capillary force) subsequent to the passage of non-aqueous or free-phase liquid through the subsurface. In addition to the proposed actions, this IM/IRAP/EA presents an assessment of the No Action Alternative. This document also considers an interim remedial action for the removal of radionuclides from beneath the 903 Pad

  19. Drafting method of electricity and electron design

    International Nuclear Information System (INIS)

    Gungbon, Junchun

    1989-11-01

    This book concentrates on drafting of electricity and electron design. It deals with The meaning of electricity and electron drafting JIS standard regulation the types of drafting and line and letter, basics drafting with projection drafting method, plan projection and development elevation, Drafting method of shop drawing, practical method of design and drafting, Design and drafting of technic and illustration, Connection diagram, Drafting of wiring diagram for light and illumination, Drafting of development connection diagram for sequence control, Drafting of logic circuit sign of flow chart and manual, drafting for a electron circuit diagram and Drawing of PC board.

  20. 76 FR 34097 - Notice of Availability of the Draft Environmental Impact Statement, Including a Draft...

    Science.gov (United States)

    2011-06-10

    ... Impact Statement, Including a Draft Programmatic Agreement, for the Clark, Lincoln, and White Pine...) has prepared a Draft Environmental Impact Statement (EIS) and a Draft Programmatic Agreement (PA.... 100 N., Nephi Beaver Library, 55 W. Center St., Beaver. The Draft EIS describes and analyzes SNWA's...

  1. Decision on performing interim analysis for comparative clinical trials.

    Science.gov (United States)

    Pak, Kyongsun; Jacobus, Susanna; Uno, Hajime

    2017-09-01

    In randomized-controlled trials, interim analyses are often planned for possible early trial termination to claim superiority or futility of a new therapy. While unblinding is necessary to conduct the formal interim analysis in blinded studies, blinded data also have information about the potential treatment difference between the groups. We developed a blinded data monitoring tool that enables investigators to predict whether they observe such an unblinded interim analysis results that supports early termination of the trial. Investigators may skip some of the planned interim analyses if an early termination is unlikely. We specifically focused on blinded, randomized-controlled studies to compare binary endpoints of a new treatment with a control. Assuming one interim analysis is planned for early termination for superiority or futility, we conducted extensive simulation studies to assess the impact of the implementation of our tool on the size, power, expected number of interim analyses, and bias in the treatment effect. The numerical study showed the proposed monitoring tool does not affect size or power, but dramatically reduces the expected number of interim analyses when the effect of the treatment difference is small. The tool serves as a useful reference when interpreting the summary of the blinded data throughout the course of the trial, without losing integrity of the study. This tool could potentially save the study resources and budget by avoiding unnecessary interim analyses.

  2. Addendum to IFMIF-CDA interim report

    Energy Technology Data Exchange (ETDEWEB)

    Maekawa, Hiroshi; Ida, Mizuho [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment; eds.

    1996-08-01

    During the second IFMIF-CDA Design Integration Workshop, the conceptual design and contents of `IFMIF-CDA Interim Report` were examined and discussed at both general and group meetings. Based on these discussion, the final IFMIF-CDA Report will be modified from the `Interim Report`. This report describes the outline of these modification. (author)

  3. Addendum to IFMIF-CDA interim report

    International Nuclear Information System (INIS)

    Maekawa, Hiroshi; Ida, Mizuho

    1996-08-01

    During the second IFMIF-CDA Design Integration Workshop, the conceptual design and contents of 'IFMIF-CDA Interim Report' were examined and discussed at both general and group meetings. Based on these discussion, the final IFMIF-CDA Report will be modified from the 'Interim Report'. This report describes the outline of these modification. (author)

  4. Sustainable Solutions for Nuclear used Fuels Interim Storage

    International Nuclear Information System (INIS)

    Arslan, Marc; Favet, Dominique; Issard, Herve; Le Jemtel, Amaury; Drevon, Caroline

    2014-01-01

    AREVA has a unique experience in providing sustainable solutions for used fuel management, fitted with the needs of different customers in the world and with regulation in different countries. These solutions entail both recycling and interim storage technologies. In a first part, we will describe the various types of solutions for Interim Storage of UNF that have been implemented around the world for interim storage at reactor or centralized Pad solution in canisters dry storage, vault type storages for dry storage, dry storage of transportation casks (dual purpose) pools for wet storage, The experience for all these different families of interim storages in which AREVA is involved is extensive and will be discussed with respect to the new challenges: increase of the duration of the interim storage (long term interim storage) increase of burn up of the fuels In a second part of the presentation, special recycling features will be presented. In that case, interim storage of the used fuels is ensured in pools. This provides in the long term good conditions for the behaviour of the fuel and its retrievability. With recycling, the final waste (Universal Canister of vitrified fission products and compacted hulls and end pieces): is stable and licensed in many countries for the final disposal (France, UK, Belgium, NL, Switzerland, Germany, Japan, upcoming: Spain, Australia, Italy). Presents neither safety criticality risks nor proliferation risks (AREVA conditioned HLW and LL-ILW are free of IAEA safeguard constraints thanks to AREVA process high recovery and purification yields). It can therefore be safely stored in interim storage for more than 100 years before final disposal. Some economic considerations will also be discussed. In particular, in the case of long term interim storage of used fuels, there are growing uncertainties regarding the future needs of repackaging and transportation, which can result in future cost overruns. Meanwhile, in the recycling policy

  5. Retention of long-term interim restorations with sodium fluoride enriched interim cement

    Science.gov (United States)

    Strash, Carolyn

    Purpose: Interim fixed dental prostheses, or "provisional restorations", are fabricated to restore teeth when definitive prostheses are made indirectly. Patients undergoing extensive prosthodontic treatment frequently require provisionalization for several months or years. The ideal interim cement would retain the restoration for as long as needed and still allow for ease of removal. It would also avoid recurrent caries by preventing demineralization of tooth structure. This study aims to determine if adding sodium fluoride varnish to interim cement may assist in the retention of interim restorations. Materials and methods: stainless steel dies representing a crown preparation were fabricated. Provisional crowns were milled for the dies using CAD/CAM technology. Crowns were provisionally cemented onto the dies using TempBond NE and NexTemp provisional cements as well as a mixture of TempBond NE and Duraphat fluoride varnish. Samples were stored for 24h then tested or thermocycled for 2500 or 5000 cycles before being tested. Retentive strength of each cement was recorded using a universal testing machine. Results: TempBond NE and NexTemp cements performed similarly when tested after 24h. The addition of Duraphat significantly decreased the retention when added to TempBond NE. NexTemp cement had high variability in retention over all tested time periods. Thermocycling for 2500 and 5000 cycles significantly decreased the retention of all cements. Conclusions: The addition of Duraphat fluoride varnish significantly decreased the retention of TempBond NE and is therefore not recommended for clinical use. Thermocycling significantly reduced the retention of TempBond NE and NexTemp. This may suggest that use of these cements for three months, as simulated in this study, is not recommended.

  6. The Nord interim store

    International Nuclear Information System (INIS)

    Leushacke, D.F.; Rittscher, D.

    1996-01-01

    In line with the decision taken in 1990 to shut down and decommission the Greifswald and Rheinsberg Nuclear Power Stations, the waste management concept of the Energiewerke Nord is based on direct and complete decommissioning of the six shut down reactor units within the next fifteen years. One key element of this concept is the construction and use of the Zwischenlager Nord (Nord Interim Store, ZLN) for holding the existing nuclear fuels and for interim and decay storage of the radioactive materials arising in decommissioning and demolition. The owner and operator of the store is Energiewerke Nord GmbH. The interim store has the functions of a processing and Energiewerke Nord GmbH. The interim store has the functions of a processing and treatment station and buffer store for the flows of residues arising. As a radioactive waste management station, it accommodates nuclear fuels, radioactive waste or residues which are not treated any further. It is used as a buffer store to allow the materials accumulating in disassembly to be stored temporarily before or after treatment in order to ensure continuous loading of the treatment plants. When operated as a processing station, the ZLN is able to handle nearly all types of radioactive waste and residues arising, except for nuclear fuels. These installations allow the treatment of radioactive residues to be separated from the demolition work both physically and in time. The possibilities of interium storage and buffer storage of untreated waste and waste packages make for high flexibility in logistics and waste management strategy. (orig.) [de

  7. General Drafting. Technical Manual.

    Science.gov (United States)

    Department of the Army, Washington, DC.

    The manual provides instructional guidance and reference material in the principles and procedures of general drafting and constitutes the primary study text for personnel in drafting as a military occupational specialty. Included is information on drafting equipment and its use; line weights, conventions and formats; lettering; engineering charts…

  8. Interim storage of radioactive waste packages

    International Nuclear Information System (INIS)

    1998-01-01

    This report covers all the principal aspects of production and interim storage of radioactive waste packages. The latest design solutions of waste storage facilities and the operational experiences of developed countries are described and evaluated in order to assist developing Member States in decision making and design and construction of their own storage facilities. This report is applicable to any category of radioactive waste package prepared for interim storage, including conditioned spent fuel, high level waste and sealed radiation sources. This report addresses the following issues: safety principles and requirements for storage of waste packages; treatment and conditioning methods for the main categories of radioactive waste; examples of existing interim storage facilities for LILW, spent fuel and high level waste; operational experience of Member States in waste storage operations including control of storage conditions, surveillance of waste packages and observation of the behaviour of waste packages during storage; retrieval of waste packages from storage facilities; technical and administrative measures that will ensure optimal performance of waste packages subject to various periods of interim storage

  9. 76 FR 58790 - Notice of Interim Approval

    Science.gov (United States)

    2011-09-22

    ... to the customers. Rate Scenario 3--Original Cumberland Marketing Policy The third rate alternative... an interim basis to the customers. Rate Scenario 3--Original Cumberland Marketing Policy The third... allocated on an interim basis to the customers. Rate Scenario 3--Original Cumberland Marketing Policy The...

  10. 10 CFR 51.74 - Distribution of draft environmental impact statement and supplement to draft environmental impact...

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Distribution of draft environmental impact statement and supplement to draft environmental impact statement; news releases. 51.74 Section 51.74 Energy NUCLEAR... Impact Statements § 51.74 Distribution of draft environmental impact statement and supplement to draft...

  11. The Interim Financial Statements: The Case of Greece

    OpenAIRE

    Rogdaki, E.I.; Kazantzis, Ch.

    1999-01-01

    The following paper refers to the accounting and auditing issues which emerge in the preparation of the interim financial statements of the companies: Firstly, the interim financial statements are defined as being the financial statements that provide useful information about the financial position and the financial results of a company which are realized and accrued during the fiscal year. The interim financial statements can be prepared on a monthly basis, on a quarterly basis or covering a...

  12. Mississippi Curriculum Framework for Drafting and Design Technology (Program CIP: 48.0102--Architectural Drafting Technology) (Program CIP: 48.0101--General Drafting). Postsecondary Programs.

    Science.gov (United States)

    Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.

    This document, which is intended for use by community and junior colleges throughout Mississippi, contains curriculum frameworks for the two course sequences of the state's postsecondary-level drafting and design technology program: architectural drafting technology and drafting and design technology. Presented first are a program description and…

  13. Effectiveness of interim remedial actions at a radioactive waste facility

    International Nuclear Information System (INIS)

    Devgun, J.S.; Beskid, N.J.; Peterson, J.M.; Seay, W.M.; McNamee, E.

    1989-01-01

    Over the past eight years, several interim remedial actions have been taken at the Niagara Falls Storage Site (NFSS), primarily to reduce radon and gamma radiation exposures and to consolidate radioactive waste into a waste containment facility. Interim remedial actions have included capping of vents, sealing of pipes, relocation of the perimeter fence (to limit radon risk), transfer and consolidation of waste, upgrading of storage buildings, construction of a clay cutoff wall (to limit the potential groundwater transport of contaminants), treatment and release of contaminated water, interim use of a synthetic liner, and emplacement of an interim clay cap. An interim waste containment facility was completed in 1986. 6 refs., 3 figs

  14. 78 FR 73555 - Deepwater Horizon Oil Spill; Draft Programmatic and Phase III Early Restoration Plan and Draft...

    Science.gov (United States)

    2013-12-06

    ... Environmental Impact Statement (Draft Phase III ERP/PEIS). The Draft Phase III ERP/PEIS considers programmatic... programmatic restoration alternatives. The Draft Phase III ERP/PEIS evaluates these restoration alternatives... the Framework Agreement. The Draft Phase III ERP/PEIS also evaluates the environmental consequences of...

  15. An Approach for Evaluating the Technical Quality of Interim Assessments

    Science.gov (United States)

    Li, Ying; Marion, Scott; Perie, Marianne; Gong, Brian

    2010-01-01

    Increasing numbers of schools and districts have expressed interest in interim assessment systems to prepare for summative assessments and to improve teaching and learning. However, with so many commercial interim assessments available, schools and districts are struggling to determine which interim assessment is most appropriate to their needs.…

  16. LEGAL DRAFTING IN CROATIA - CASE STUDY

    Directory of Open Access Journals (Sweden)

    Dario Đerđa

    2017-01-01

    Full Text Available This paper highlights the importance of legal drafting and its essential elements, which has not drawn a lot of attention in the Republic of Croatia so far. The paper emphasises the importance of proportionality in the simplicity and legal distinctness of a legal text in the process of drafting for the purpose of its clarity. The paper also presents objective requirements necessary for quality legal drafting, as well as subjective qualities of the drafters. With the purpose of drawing attention to imperfections in the legal drafting in Croatia, some defi ciencies are presented in the process of drafting and amending of the Utility Services Act. The process of drafting and amending of this Act is a good example of the way how legal drafting should not be done. It contains a lot of defi ciencies and failures that are the result of legal drafting mistakes. At the end, authors expect that the adoption of the Uniform methodology and nomotechnical rules for the drafting of acts enacted by Parliament should contribute to the higher quality of legal texts and to their full adjustment to the general requirements of legal certainty and rule of law.

  17. EPA scientific integrity policy draft

    Science.gov (United States)

    Showstack, Randy

    2011-08-01

    The U.S. Environmental Protection Agency (EPA) issued its draft scientific integrity policy on 5 August. The draft policy addresses scientific ethical standards, communications with the public, the use of advisory committees and peer review, and professional development. The draft policy was developed by an ad hoc group of EPA senior staff and scientists in response to a December 2010 memorandum on scientific integrity from the White House Office of Science and Technology Policy. The agency is accepting public comments on the draft through 6 September; comments should be sent to osa.staff@epa.gov. For more information, see http://www.epa.gov/stpc/pdfs/draft-scientific-integrity-policy-aug2011.pdf.

  18. Disposal facility data for the interim performance

    International Nuclear Information System (INIS)

    Eiholzer, C.R.

    1995-01-01

    The purpose of this report is to identify and provide information on the waste package and disposal facility concepts to be used for the low-level waste tank interim performance assessment. Current concepts for the low-level waste form, canister, and the disposal facility will be used for the interim performance assessment. The concept for the waste form consists of vitrified glass cullet in a sulfur polymer cement matrix material. The waste form will be contained in a 2 x 2 x 8 meter carbon steel container. Two disposal facility concepts will be used for the interim performance assessment. These facility concepts are based on a preliminary disposal facility concept developed for estimating costs for a disposal options configuration study. These disposal concepts are based on vault type structures. None of the concepts given in this report have been approved by a Tank Waste Remediation Systems (TWRS) decision board. These concepts will only be used in th interim performance assessment. Future performance assessments will be based on approved designs

  19. 78 FR 64493 - Juneau Hydropower, Inc.; Notice of Subsequent Draft License Application (DLA) and Draft...

    Science.gov (United States)

    2013-10-29

    ... Hydropower, Inc.; Notice of Subsequent Draft License Application (DLA) and Draft Preliminary Draft... Hydropower, Inc. e. Name of Project: Sweetheart Lake Hydroelectric Project. f. Location: At the confluence of..., Business Manager, Juneau Hydropower, Inc., P.O. Box 22775, Juneau, AK 99802; 907-789-2775, email: duff...

  20. Subsurface Interim Measures/Interim Remedial Action Plan/ Environmental Assessment and Decision Document, Operable Unit No. 2

    International Nuclear Information System (INIS)

    1992-01-01

    The subject Interim Measures/Interim Remedial Action plan/Environmental Assessment (IM/IRAP/EA) addresses residual free-phase volatile organic compound (VOC) contamination suspected in the subsurface within an area identified as Operable Unit No. 2 (OU2). This IM/IRAP/EA also addresses radionuclide contamination beneath the 903 Pad at OU2. Although subsurface VOC and radionuclide contamination on represent a source of OU2 ground-water contamination, they pose no immediate threat to public health or the environment. This volume contains five appendices

  1. 75 FR 63519 - Notice of Availability of Draft Environmental Assessment and Draft Finding of No Significant...

    Science.gov (United States)

    2010-10-15

    ... reduced for certain environmental resource areas (i.e., for transportation, public and occupational health... NUCLEAR REGULATORY COMMISSION [NRC-2009-0435] Notice of Availability of Draft Environmental... of Availability of Draft Environmental Assessment and Draft Finding of No Significant Impact; Notice...

  2. CMM Interim Check Design of Experiments (U)

    Energy Technology Data Exchange (ETDEWEB)

    Montano, Joshua Daniel [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2015-07-29

    Coordinate Measuring Machines (CMM) are widely used in industry, throughout the Nuclear Weapons Complex and at Los Alamos National Laboratory (LANL) to verify part conformance to design definition. Calibration cycles for CMMs at LANL are predominantly one year in length and include a weekly interim check to reduce risk. The CMM interim check makes use of Renishaw’s Machine Checking Gauge which is an off-the-shelf product simulates a large sphere within a CMM’s measurement volume and allows for error estimation. As verification on the interim check process a design of experiments investigation was proposed to test a couple of key factors (location and inspector). The results from the two-factor factorial experiment proved that location influenced results more than the inspector or interaction.

  3. Permitting plan for the high-level waste interim storage

    International Nuclear Information System (INIS)

    Deffenbaugh, M.L.

    1997-01-01

    This document addresses the environmental permitting requirements for the transportation and interim storage of solidified high-level waste (HLW) produced during Phase 1 of the Hanford Site privatization effort. Solidified HLW consists of canisters containing vitrified HLW (glass) and containers that hold cesium separated during low-level waste pretreatment. The glass canisters and cesium containers will be transported to the Canister Storage Building (CSB) in a U.S. Department of Energy (DOE)-provided transportation cask via diesel-powered tractor trailer. Tri-Party Agreement (TPA) Milestone M-90 establishes a new major milestone, and associated interim milestones and target dates, governing acquisition and/or modification of facilities necessary for: (1) interim storage of Tank Waste Remediation Systems (TWRS) immobilized HLW (IHLW) and other canistered high-level waste forms; and (2) interim storage and disposal of TWRS immobilized low-activity tank waste (ILAW). An environmental requirements checklist and narrative was developed to identify the permitting path forward for the HLW interim storage (HLWIS) project (See Appendix B). This permitting plan will follow the permitting logic developed in that checklist

  4. Evaluation of ERA-Interim precipitation data in complex terrain

    Science.gov (United States)

    Gao, Lu; Bernhardt, Matthias; Schulz, Karsten

    2013-04-01

    Precipitation controls a large variety of environmental processes, which is an essential input parameter for land surface models e.g. in hydrology, ecology and climatology. However, rain gauge networks provides the necessary information, are commonly sparse in complex terrains, especially in high mountainous regions. Reanalysis products (e.g. ERA-40 and NCEP-NCAR) as surrogate data are increasing applied in the past years. Although they are improving forward, previous studies showed that these products should be objectively evaluated due to their various uncertainties. In this study, we evaluated the precipitation data from ERA-Interim, which is a latest reanalysis product developed by ECMWF. ERA-Interim daily total precipitation are compared with high resolution gridded observation dataset (E-OBS) at 0.25°×0.25° grids for the period 1979-2010 over central Alps (45.5-48°N, 6.25-11.5°E). Wet or dry day is defined using different threshold values (0.5mm, 1mm, 5mm, 10mm and 20mm). The correspondence ratio (CR) is applied for frequency comparison, which is the ratio of days when precipitation occurs in both ERA-Interim and E-OBS dataset. The result shows that ERA-Interim captures precipitation occurrence very well with a range of CR from 0.80 to 0.97 for 0.5mm to 20mm thresholds. However, the bias of intensity increases with rising thresholds. Mean absolute error (MAE) varies between 4.5 mm day-1 and 9.5 mm day-1 in wet days for whole area. In term of mean annual cycle, ERA-Interim almost has the same standard deviation of the interannual variability of daily precipitation with E-OBS, 1.0 mm day-1. Significant wet biases happened in ERA-Interim throughout warm season (May to August) and dry biases in cold season (November to February). The spatial distribution of mean annual daily precipitation shows that ERA-Interim significant underestimates precipitation intensity in high mountains and northern flank of Alpine chain from November to March while pronounced

  5. 12 CFR 541.18 - Interim Federal savings association.

    Science.gov (United States)

    2010-01-01

    ... an existing savings and loan holding company or to facilitate any other transaction the Office may... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Interim Federal savings association. 541.18... REGULATIONS AFFECTING FEDERAL SAVINGS ASSOCIATIONS § 541.18 Interim Federal savings association. The term...

  6. Phase 1 remediation of jet fuel contaminated soil and groundwater at JFK International Airport using dual phase extraction and bioventing

    International Nuclear Information System (INIS)

    Roth, R.; Bianco, P. Rizzo, M.

    1995-01-01

    Soil and groundwater contaminated with jet fuel at Terminal One of the JFK International Airport in New York have been remediated using dual phase extraction (DPE) and bioventing. Two areas were remediated using 51 DPE wells and 20 air sparging/air injection wells. The total area remediated by the DPE wells is estimated to be 4.8 acres. Groundwater was extracted to recover nonaqueous phase and aqueous phase jet fuel from the shallow aquifer and treated above ground by the following processes; oil/water separation, iron-oxidation, flocculation, sedimentation, filtration, air stripping and liquid-phase granular activated carbon (LPGAC) adsorption. The extracted vapors were treated by vapor-phase granular activated carbon (VPGAC) adsorption in one area, and catalytic oxidation and VPGAC adsorption in another area. After 6 months of remediation, approximately 5,490 lbs. of volatile organic compounds (VOCs) were removed by soil vapor extraction (SVE), 109,650 lbs. of petroleum hydrocarbons were removed from the extracted groundwater, and 60,550 lbs. of petroleum hydrocarbons were biologically oxidized by subsurface microorganisms. Of these three mechanisms, the rate of petroleum hydrocarbon removal was the highest for biological oxidation in one area and by groundwater extraction in another area

  7. Single-shell tank interim stabilization project plan

    Energy Technology Data Exchange (ETDEWEB)

    Ross, W.E.

    1998-03-27

    Solid and liquid radioactive waste continues to be stored in 149 single-shell tanks at the Hanford Site. To date, 119 tanks have had most of the pumpable liquid removed by interim stabilization. Thirty tanks remain to be stabilized. One of these tanks (C-106) will be stabilized by retrieval of the tank contents. The remaining 29 tanks will be interim stabilized by saltwell pumping. In the summer of 1997, the US Department of Energy (DOE) placed a moratorium on the startup of additional saltwell pumping systems because of funding constraints and proposed modifications to the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) milestones to the Washington State Department of Ecology (Ecology). In a letter dated February 10, 1998, Final Determination Pursuant to Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) in the Matter of the Disapproval of the DOE`s Change Control Form M-41-97-01 (Fitzsimmons 1998), Ecology disapproved the DOE Change Control Form M-41-97-01. In response, Fluor Daniel Hanford, Inc. (FDH) directed Lockheed Martin Hanford Corporation (LNMC) to initiate development of a project plan in a letter dated February 25, 1998, Direction for Development of an Aggressive Single-Shell Tank (SST) Interim Stabilization Completion Project Plan in Support of Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement). In a letter dated March 2, 1998, Request for an Aggressive Single-Shell Tank (SST) Interim Stabilization Completion Project Plan, the DOE reaffirmed the need for an aggressive SST interim stabilization completion project plan to support a finalized Tri-Party Agreement Milestone M-41 recovery plan. This project plan establishes the management framework for conduct of the TWRS Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organizational structure, roles, responsibilities

  8. Single-shell tank interim stabilization project plan

    International Nuclear Information System (INIS)

    Ross, W.E.

    1998-01-01

    Solid and liquid radioactive waste continues to be stored in 149 single-shell tanks at the Hanford Site. To date, 119 tanks have had most of the pumpable liquid removed by interim stabilization. Thirty tanks remain to be stabilized. One of these tanks (C-106) will be stabilized by retrieval of the tank contents. The remaining 29 tanks will be interim stabilized by saltwell pumping. In the summer of 1997, the US Department of Energy (DOE) placed a moratorium on the startup of additional saltwell pumping systems because of funding constraints and proposed modifications to the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) milestones to the Washington State Department of Ecology (Ecology). In a letter dated February 10, 1998, Final Determination Pursuant to Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) in the Matter of the Disapproval of the DOE's Change Control Form M-41-97-01 (Fitzsimmons 1998), Ecology disapproved the DOE Change Control Form M-41-97-01. In response, Fluor Daniel Hanford, Inc. (FDH) directed Lockheed Martin Hanford Corporation (LNMC) to initiate development of a project plan in a letter dated February 25, 1998, Direction for Development of an Aggressive Single-Shell Tank (SST) Interim Stabilization Completion Project Plan in Support of Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement). In a letter dated March 2, 1998, Request for an Aggressive Single-Shell Tank (SST) Interim Stabilization Completion Project Plan, the DOE reaffirmed the need for an aggressive SST interim stabilization completion project plan to support a finalized Tri-Party Agreement Milestone M-41 recovery plan. This project plan establishes the management framework for conduct of the TWRS Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organizational structure, roles, responsibilities

  9. 40 CFR 80.141 - Interim detergent gasoline program.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 16 2010-07-01 2010-07-01 false Interim detergent gasoline program. 80... (CONTINUED) REGULATION OF FUELS AND FUEL ADDITIVES Detergent Gasoline § 80.141 Interim detergent gasoline... apply to: (i) All gasoline sold or transferred to a party who sells or transfers gasoline to the...

  10. Competency Reference for Computer Assisted Drafting.

    Science.gov (United States)

    Oregon State Dept. of Education, Salem. Div. of Vocational Technical Education.

    This guide, developed in Oregon, lists competencies essential for students in computer-assisted drafting (CAD). Competencies are organized in eight categories: computer hardware, file usage and manipulation, basic drafting techniques, mechanical drafting, specialty disciplines, three dimensional drawing/design, plotting/printing, and advanced CAD.…

  11. Design review report FFTF interim storage cask

    International Nuclear Information System (INIS)

    Scott, P.L.

    1995-01-01

    Final Design Review Report for the FFTF Interim Storage Cask. The Interim Storage Cask (ISC) will be used for long term above ground dry storage of FFTF irradiated fuel in Core Component Containers (CCC)s. The CCC has been designed and will house assemblies that have been sodium washed in the IEM Cell. The Solid Waste Cask (SWC) will transfer a full CCC from the IEM Cell to the RSB Cask Loading Station where the ISC will be located to receive it. Once the loaded ISC has been sealed at the RSB Cask Loading Station, it will be transferred by facility crane to the DSWC Transporter. After the ISC has been transferred to the Interim Storage Area (ISA), which is yet to be designed, a mobile crane will be used to place the ISC in its final storage location

  12. Choosing a spent fuel interim storage system

    International Nuclear Information System (INIS)

    Roland, V.; Hunter, I.

    2001-01-01

    The Transnucleaire Group has developed different modular solutions to address spent fuel interim storage needs of NPP. These solutions, that are present in Europe, USA and Asia are metal casks (dual purpose or storage only) of the TN 24 family and the NUHOMS canister based system. It is not always simple for an operator to sort out relevant choice criteria. After explaining the basic designs involved on the examples of the TN 120 WWER dual purpose cask and the NUHOMS 56 WWER for WWER 440 spent fuel, we shall discuss the criteria that govern the choice of a given spent fuel interim storage system from the stand point of the operator. In conclusion, choosing and implementing an interim storage system is a complex process, whose implications can be far reaching for the long-term success of a spent fuel management policy. (author)

  13. 78 FR 67442 - Congestion Mitigation and Air Quality Improvement Program Interim Guidance

    Science.gov (United States)

    2013-11-12

    ...] Congestion Mitigation and Air Quality Improvement Program Interim Guidance AGENCY: Federal Highway... Comment. SUMMARY: The FHWA is issuing Interim Guidance on the Congestion Mitigation and Air Quality.../environment/air_quality/cmaq/policy_and_guidance/2008_guidance/ guidance/. DATES: This Interim Guidance is...

  14. 47 CFR 51.715 - Interim transport and termination pricing.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 3 2010-10-01 2010-10-01 false Interim transport and termination pricing. 51.715 Section 51.715 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER... Telecommunications Traffic § 51.715 Interim transport and termination pricing. (a) Upon request from a...

  15. ITER Conceptual design: Interim report

    International Nuclear Information System (INIS)

    1990-01-01

    This interim report describes the results of the International Thermonuclear Experimental Reactor (ITER) Conceptual Design Activities after the first year of design following the selection of the ITER concept in the autumn of 1988. Using the concept definition as the basis for conceptual design, the Design Phase has been underway since October 1988, and will be completed at the end of 1990, at which time a final report will be issued. This interim report includes an executive summary of ITER activities, a description of the ITER device and facility, an operation and research program summary, and a description of the physics and engineering design bases. Included are preliminary cost estimates and schedule for completion of the project

  16. Finding of no significant impact: Interim storage of enriched uranium above the maximum historical level at the Y-12 Plant Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1995-01-01

    The US Department of Energy (DOE) has prepared an Environmental Assessment (EA) for the Proposed Interim Storage of Enriched Uranium Above the Maximum Historical Storage Level at the Y-12 Plant, Oak Ridge, Tennessee (DOE/EA-0929, September, 1994). The EA evaluates the environmental effects of transportation, prestorage processing, and interim storage of bounding quantities of enriched uranium at the Y-12 Plant over a ten-year period. The State of Tennessee and the public participated in public meetings and workshops which were held after a predecisional draft EA was released in February 1994, and after the revised pre-approval EA was issued in September 1994. Comments provided by the State and public have been carefully considered by the Department. As a result of this public process, the Department has determined that the Y-12 Plant-would store no more than 500 metric tons of highly enriched uranium (HEU) and no more than 6 metric tons of low enriched uranium (LEU). The bounding storage quantities analyzed in the pre-approval EA are 500 metric tons of HEU and 7,105.9 metric tons of LEU. Based on-the analyses in the EA, as revised by the attachment to the Finding of No Significant Impact (FONSI), DOE has determined that interim storage of 500 metric tons of HEU and 6 metric tons of LEU at the Y-12 Plant does not constitute a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, an Environmental Impact Statement (EIS) is not required and the Department is issuing this FONSI

  17. A comparison of the value relevance of interim and annual financial statements

    Directory of Open Access Journals (Sweden)

    Mbalenhle Zulu

    2017-03-01

    Aim: It explores whether the value relevance of interim financial statements is higher than the value relevance of annual financial statements. Finally, it investigates whether accounting information published in interim and annual financial statements has incremental value relevance. Setting: Data for the period from 1999 to 2012 were collected from a sample of non-financial companies listed on the Johannesburg Stock Exchange. Method: The Ohlson model to investigate the value relevance of accounting information was used for the study. Results: The results show that interim book value of equity is value relevant while interim earnings are not. Interim financial statements appear to have higher value relevance than annual financial statements. The value relevance of interim and annual accounting information has remained fairly constant over the sample period. Incremental comparisons provide evidence that additional book value of equity and earnings that accrue to a company between interim and annual reporting dates are value relevant. Conclusion: The study was conducted over a long sample period (1999–2012, in an era when a technology-driven economy and more timely reporting media could have had an effect on the value relevance of published accounting information. To the best of our knowledge, this is the first study to evaluate and compare the value relevance of published interim and annual financial statements.

  18. Evaluation of Worktext in Mechanical Drafting

    Directory of Open Access Journals (Sweden)

    Erich D. Cruz

    2015-11-01

    Full Text Available This study aimed to evaluate Worktext in Drafting Technology 4 (Mechanical Drafting for Bachelor of Technology (BT major in Drafting Technology. It was conducted at University of Rizal System with twenty Drafting and Mechanical Technology professors as respondents. The study used the descriptive evaluative method to describe and evaluate the developed Worktext in DT 4 using the questionnaire-checklist in gathering data. They were asked to evaluate the worktext through the following: objectives, contents, activities, presentation and style, organization, creativity, evaluation, accuracy, completeness and appropriateness. It was found out that the developed worktext with respect to objectives was highly agree, contents was highly agree, activities was highly agree, presentation and style was agree, creativity was highly agree and evaluation was highly agree. Meaning that the items with highly agree interpretations attained excellent level of acceptability while those with agree interpretations obtained extensive level of acceptability with fully achieved and above average Drafting standards, respectively. It was also found out that the developed worktext in terms of accuracy was high, completeness was very high and appropriateness was likewise very high. The researcher recommends that the developed Worktext in Drafting Technology 4 may be adopted for use by the Bachelor of Technology major in Drafting Technology students.

  19. Predicted percentage dissatisfied with ankle draft.

    Science.gov (United States)

    Liu, S; Schiavon, S; Kabanshi, A; Nazaroff, W W

    2017-07-01

    Draft is unwanted local convective cooling. The draft risk model of Fanger et al. (Energy and Buildings 12, 21-39, 1988) estimates the percentage of people dissatisfied with air movement due to overcooling at the neck. There is no model for predicting draft at ankles, which is more relevant to stratified air distribution systems such as underfloor air distribution (UFAD) and displacement ventilation (DV). We developed a model for predicted percentage dissatisfied with ankle draft (PPD AD ) based on laboratory experiments with 110 college students. We assessed the effect on ankle draft of various combinations of air speed (nominal range: 0.1-0.6 m/s), temperature (nominal range: 16.5-22.5°C), turbulence intensity (at ankles), sex, and clothing insulation (thermal sensation and air speed at ankles are the dominant parameters affecting draft. The seated subjects accepted a vertical temperature difference of up to 8°C between ankles (0.1 m) and head (1.1 m) at neutral whole-body thermal sensation, 5°C more than the maximum difference recommended in existing standards. The developed ankle draft model can be implemented in thermal comfort and air diffuser testing standards. © 2016 John Wiley & Sons A/S. Published by John Wiley & Sons Ltd.

  20. Single-shell tank interim stabilization risk analysis

    International Nuclear Information System (INIS)

    Basche, A.D.

    1998-01-01

    The purpose of the Single-Shell Tank (SST) Interim Stabilization Risk Analysis is to provide a cost and schedule risk analysis of HNF-2358, Rev. 1, Single-Shell Tank Interim Stabilization Project Plan (Project Plan) (Ross et al. 1998). The analysis compares the required cost profile by fiscal year (Section 4.2) and revised schedule completion date (Section 4.5) to the Project Plan. The analysis also evaluates the executability of the Project Plan and recommends a path forward for risk mitigation

  1. The draft on the act in the reorganisation of responsibility in nuclear waste management; Der Gesetzentwurf zur Neuordnung der Verantwortung in der kerntechnischen Entsorgung

    Energy Technology Data Exchange (ETDEWEB)

    Raetzke, Christian [CONLAR Consulting on Nuclear Law and Regulation, Leipzig (Germany)

    2016-12-15

    The German Federal Cabinet passed the draft ''Act for the Reorganisation of Responsibility in Nuclear Waste Management''. The individual elements of the act shape an overall concept. The public sector, also assumes the interim storage of the waste in addition to the previous responsibility for final disposal of radioactive waste. Both tasks will be financed by a new public fund into which the operators pay their provisions. By paying an additional risk premium the operators can also exclude future margin requirements. This new concept is to be welcomed because it would lead to a structurally viable and sustainable solution for the final disposal of nuclear wastes, not withstanding many difficulties and partly uncertainties in detail.

  2. TWRS HLW interim storage facility search and evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Calmus, R.B., Westinghouse Hanford

    1996-05-16

    The purpose of this study was to identify and provide an evaluation of interim storage facilities and potential facility locations for the vitrified high-level waste (HLW) from the Phase I demonstration plant and Phase II production plant. In addition, interim storage facilities for solidified separated radionuclides (Cesium and Technetium) generated during pretreatment of Phase I Low-Level Waste Vitrification Plant feed was evaluated.

  3. 77 FR 17091 - Trust Land Consolidation Draft Plan

    Science.gov (United States)

    2012-03-23

    ... DEPARTMENT OF THE INTERIOR Office of the Secretary Trust Land Consolidation Draft Plan AGENCY... reopening the period for commenting on the Cobell Land Consolidation Program Draft Plan (also known as the Trust Land Consolidation Draft Plan), which is the draft plan for accomplishing these goals. DATES...

  4. Gaz de France interim financial report 2007

    International Nuclear Information System (INIS)

    2007-01-01

    This financial report contains the unaudited condensed financial statements of Gaz de France Group for the first half ended June 30, 2007, which were reviewed by the audit committee on August 27, 2007 and by the board of directors at its meeting on August 28, 2007. It includes forward-looking statements concerning the objectives, strategies, financial position, future operating results and the operations of Gaz de France Group. These statements reflect the Group's current perception of its activities and the markets in which it operates, as well as various estimates and assumptions considered to be reasonable. Content: interim management report (highlights of the first half of 2007, revenues and results for the period, financial structure, data on outstanding stock, outlook); interim consolidated financial statements (consolidated statements of income, consolidated balance sheets, consolidated statements of cash flows, recognized income and expenses, statements of changes in shareholders' equity, note to the consolidated financial statements); statement by the person responsible for the interim financial report; statutory auditors' report. (J.S.)

  5. Industrial complementarities between interim storage and reversible geological repository - 59237

    International Nuclear Information System (INIS)

    Hoorelbeke, Jean-Michel

    2012-01-01

    The French Act voted in 2006 made the choice of deep geological disposal as the reference option for the long term management of high level (HLW) and intermediate level long-lived waste. The CIGEO repository project aims at avoiding or limiting burden to future generations, which could not be achieved by the extension in time of interim storage. The reversibility as provided by the Act will maintain a liberty of choice for waste management on a duration which is comparable to new storage facility. Interim storage is required to accommodate waste as long as the repository is not available. The commissioning of the repository in 2025 will not suppress needs for interim storage. The paper describes the complementarities between existing and future interim storage facilities and the repository project: repository operational issues and planning, HLW thermal decay, support for the reversibility, etc. It shows opportunities to prepare a global optimization of waste management including the utilization at best of storage capacities and the planning of waste emplacement in the repository in such a way to facilitate operational conditions and to limit cost. Preliminary simulations of storage-disposal scenarios are presented. Thanks to an optimal use of the waste management system, provision can be made for a progressive increase of waste emplacement flow during the first operation phase of the repository. It is then possible to stabilize the industrial activity level of the repository site. An optimal utilization of interim storage can also limit the diversity of waste packages emplaced simultaneously, which facilitates the operation of the repository. 60 years minimum interim storage duration is generally required with respect to HLW thermal output. Extending this interim storage period may reduce the underground footprint of the repository. Regarding reversibility, the capability to manage waste packages potentially retrieved from the repository should be analyzed. The

  6. System for implement draft reduction

    DEFF Research Database (Denmark)

    2008-01-01

    Abstract of WO 2008095503  (A1) There is disclosed a system and method of reducing draft forces when working soil with agricultural soil working implements (206, 211) creating draft forces, the soil working implements (208, 206, 211) beingoperable connectable to a frame (204, 304, 404, 504, 604......, the second part of the width comprising an other part of said width (212) than the first part (222), so as e.g. to reduce draft forces compared to working both first and second parts at the same time....

  7. Fire Hazards Analysis for the 200 Area Interim Storage Area

    International Nuclear Information System (INIS)

    JOHNSON, D.M.

    2000-01-01

    This documents the Fire Hazards Analysis (FHA) for the 200 Area Interim Storage Area. The Interim Storage Cask, Rad-Vault, and NAC-1 Cask are analyzed for fire hazards and the 200 Area Interim Storage Area is assessed according to HNF-PRO-350 and the objectives of DOE Order 5480 7A. This FHA addresses the potential fire hazards associated with the Interim Storage Area (ISA) facility in accordance with the requirements of DOE Order 5480 7A. It is intended to assess the risk from fire to ensure there are no undue fire hazards to site personnel and the public and to ensure property damage potential from fire is within acceptable limits. This FHA will be in the form of a graded approach commensurate with the complexity of the structure or area and the associated fire hazards

  8. Physical protection of shipments of irradiated reactor fuel; Interim guidance. Regulatory report

    International Nuclear Information System (INIS)

    1980-06-01

    During May, 1979, the U.S. Nuclear Regulatory Commission approved for issuance in effective form new interim regulations for strengthening the protection of spent fuel shipments against sabotage and diversion. The new regulations were issued without benefit of public comment, but comments from the public were solicited after the effective date. Based upon the public comments received, the interim regulations were amended and reissued in effective form as a final interim rule in May, 1980. The present document supersedes a previously issued interim guidance document, NUREG-0561 (June, 1979) which accompanied the original rule. This report has been revised to conform to the new interim regulations on the physical protection of shipments of irradiated reactor fuel which are likely to remain in effect until the completion of an ongoing research program concerning the response of spent fuel to certain forms of sabotage, at which time the regulations may be rescinded, modified or made permanent, as appropriate. This report discusses the amended regulations and provides a basis on which licensees can develop an acceptable interim program for the protection of spent fuel shipments

  9. Use of alternative dispute resolution--HHS. Notice of interim policy.

    Science.gov (United States)

    1992-10-27

    The Department has developed an interim policy to address the use of alternative dispute resolution (ADR) as required by the Administrative Dispute Resolution Act (ADR Act), Public Law No. 101-552. This interim policy also responds to the Negotiated Rulemaking Act, Public Law No. 101-648, and relevant elements of the Executive Order on Civil Justice Reform (E.O. 12778). The Department is adopting an interim policy because we need a baseline of experience and knowledge from our own pilot activities and those of other agencies before finalizing a policy.

  10. 50 CFR 660.720 - Interim protection for sea turtles.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 9 2010-10-01 2010-10-01 false Interim protection for sea turtles. 660.720 Section 660.720 Wildlife and Fisheries FISHERY CONSERVATION AND MANAGEMENT, NATIONAL OCEANIC AND... Migratory Fisheries § 660.720 Interim protection for sea turtles. (a) Until the effective date of §§ 660.707...

  11. CMM Interim Check (U)

    Energy Technology Data Exchange (ETDEWEB)

    Montano, Joshua Daniel [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2015-03-23

    Coordinate Measuring Machines (CMM) are widely used in industry, throughout the Nuclear Weapons Complex and at Los Alamos National Laboratory (LANL) to verify part conformance to design definition. Calibration cycles for CMMs at LANL are predominantly one year in length. Unfortunately, several nonconformance reports have been generated to document the discovery of a certified machine found out of tolerance during a calibration closeout. In an effort to reduce risk to product quality two solutions were proposed – shorten the calibration cycle which could be costly, or perform an interim check to monitor the machine’s performance between cycles. The CMM interim check discussed makes use of Renishaw’s Machine Checking Gauge. This off-the-shelf product simulates a large sphere within a CMM’s measurement volume and allows for error estimation. Data was gathered, analyzed, and simulated from seven machines in seventeen different configurations to create statistical process control run charts for on-the-floor monitoring.

  12. Comparison of Conventional and Computer-aided Drafting Methods from the View of Time and Drafting Quality

    OpenAIRE

    OZKAN, Aysen; YILDIRIM, Kemal

    2016-01-01

    Problem Statement: Drafting course is essential for students in the design disciplines for becoming more organized and for complying with standards in the educational system. Drafting knowledge is crucial, both for comprehension of the issues and for the implementation phase. In any design project, drafting performance and success are as important as the design process, especially in the educational environments aimed at professional life. However, there have been relatively any studies under...

  13. Mississippi Curriculum Framework for General Drafting (Program CIP: 48.0101--Drafting, General). Secondary Programs.

    Science.gov (United States)

    Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.

    This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for two secondary-level courses in drafting: drafting I and II. Presented…

  14. Interim process report for the safety assessment SR-Can

    International Nuclear Information System (INIS)

    Sellin, Patrick

    2004-08-01

    This report is a documentation of buffer processes identified as relevant to the long-term safety of a KBS-3 repository. The report is part of the interim reporting of the safety assessment SR-Can, see further the Interim main report. The final SR-Can reporting will support SKB's application to build an Encapsulation plant for spent nuclear fuel and is to be produced in 2006. The purpose of this report is to document the scientific knowledge of the processes to a level required for an adequate treatment in the safety assessment. The documentation is thus from a scientific point of not exhaustive since such a treatment is neither necessary for the purposes of the safety assessment nor possible within the scope of an assessment. The purpose is further to determine the handling of each process in the safety assessment and to demonstrate how uncertainties are taken care of, given the suggested handling. The process documentation in the SR 97 version of the Process report is a starting point for this SR-Can interim version. As further described in the Interim main report, the list of relevant processes has been reviewed and slightly extended by comparison to other databases. Furthermore, the backfill has been included as a system part of its own, rather than being described together with the buffer as in SR 97. Apart from giving an interim account of the documentation and handling of buffer processes in SR-Can, this report is meant to serve as a template for the forthcoming documentation of processes occurring in other parts of the repository system. A complete list of processes can be found in the Interim FEP report for the safety assessment SR-Can. All material presented in this document is preliminary in nature and will possibly be updated as the SR-Can project progresses

  15. Interim process report for the safety assessment SR-Can

    Energy Technology Data Exchange (ETDEWEB)

    Sellin, Patrick (ed.)

    2004-08-01

    This report is a documentation of buffer processes identified as relevant to the long-term safety of a KBS-3 repository. The report is part of the interim reporting of the safety assessment SR-Can, see further the Interim main report. The final SR-Can reporting will support SKB's application to build an Encapsulation plant for spent nuclear fuel and is to be produced in 2006. The purpose of this report is to document the scientific knowledge of the processes to a level required for an adequate treatment in the safety assessment. The documentation is thus from a scientific point of not exhaustive since such a treatment is neither necessary for the purposes of the safety assessment nor possible within the scope of an assessment. The purpose is further to determine the handling of each process in the safety assessment and to demonstrate how uncertainties are taken care of, given the suggested handling. The process documentation in the SR 97 version of the Process report is a starting point for this SR-Can interim version. As further described in the Interim main report, the list of relevant processes has been reviewed and slightly extended by comparison to other databases. Furthermore, the backfill has been included as a system part of its own, rather than being described together with the buffer as in SR 97. Apart from giving an interim account of the documentation and handling of buffer processes in SR-Can, this report is meant to serve as a template for the forthcoming documentation of processes occurring in other parts of the repository system. A complete list of processes can be found in the Interim FEP report for the safety assessment SR-Can. All material presented in this document is preliminary in nature and will possibly be updated as the SR-Can project progresses.

  16. Materials behavior in interim storage of spent fuel

    International Nuclear Information System (INIS)

    Johnson, A.B. Jr.; Bailey, W.J.; Gilbert, E.R.; Inman, S.C.

    1982-01-01

    Interim storage has emerged as the only current spent-fuel management method in the US and is essential in all countries with nuclear reactors. Materials behavior is a key aspect in licensing interim-storage facilities for several decades of spent-fuel storage. This paper reviews materials behavior in wet storage, which is licensed for light-water reactor (LWR) fuel, and dry storage, for which a licensing position for LWR fuel is developing

  17. Interim Safety Basis for Fuel Supply Shutdown Facility

    International Nuclear Information System (INIS)

    BENECKE, M.W.

    2000-01-01

    This ISB, in conjunction with the IOSR, provides the required basis for interim operation or restrictions on interim operations and administrative controls for the facility until a SAR is prepared in accordance with the new requirements or the facility is shut down. It is concluded that the risks associated with tha current and anticipated mode of the facility, uranium disposition, clean up, and transition activities required for permanent closure, are within risk guidelines

  18. Spent fuel interim management: 1995 update

    International Nuclear Information System (INIS)

    Anderson, C.K.

    1995-01-01

    The problems of interim away-from-reactor spent fuel storage and storage in spent fuel pools at the reactor site are discussed. An overview of the state-of-the-art in the USA, Europe, and Japan is presented. The technical facilities for away-from-reactor storage are briefly described, including wet storage pools, interactive concrete systems, metallic containers, and passive concrete systems. Reprocessing technologies are mostly at the design stage only. It is predicted that during the 20 years to come, about 50 000 tonnes of spent fuel will be stored at reactor sites regardless of the advance of spent fuel reprocessing or interim storage projects. (J.B.). 4 tabs., 2 figs

  19. General certification procedure of enterprises and interim job enterprises

    CERN Document Server

    Int. At. Energy Agency, Wien

    2002-01-01

    This procedure defines the certification global process of enterprises employing workers of A or B category for nuclear facilities and interim job enterprises proposing workers of A or B category for nuclear facilities. This certification proves the enterprises ability to satisfy the specification ''E'' of the CEFRI and the interim job enterprises to satisfy the specification ''I'' of the CEFRI. (A.L.B.)

  20. Forced draft wet cooling systems

    International Nuclear Information System (INIS)

    Daubert, A.; Caudron, L.; Viollet, P.L.

    1975-01-01

    The disposal of the heat released from a 1000MW power plant needs a natural draft tower of about 130m of diameter at the base, and 170m height, or a cooling system with a draft forced by about forty vans, a hundred meters in diameter, and thirty meters height. The plumes from atmospheric cooling systems form, in terms of fluid mechanics, hot jets in a cross current. They consist in complex flows that must be finely investigated with experimental and computer means. The study, currently being performed at the National Hydraulics Laboratory, shows that as far as the length and height of visible plumes are concerned, the comparison is favorable to some types of forced draft cooling system, for low and medium velocities, (below 5 or 6m/s at 10m height. Beyond these velocities, the forced draft sends the plume up to smaller heights, but the plume is generally more dilute [fr

  1. 76 FR 381 - Notice of Availability of the Draft Environmental Impact Statement/Draft Environmental Impact...

    Science.gov (United States)

    2011-01-04

    ...In accordance with the National Environmental Policy Act of 1969, as amended (NEPA), and the Federal Land Policy and Management Act of 1976, as amended (FLPMA), the Bureau of Land Management (BLM) and the California Public Utilities Commission (CPUC) have prepared a Draft Environmental Impact Statement (EIS), and Draft Environmental Impact Report (EIR) as a joint environmental analysis document for the Iberdrola Renewable/Pacific Wind Development Tule Wind Project (Tule Project) and the San Diego Gas and Electric's (SDG&E) East County Substation Project (ECO Project) and by this notice are announcing the opening of the comment period on the Draft EIS/EIR.

  2. ITER interim design report package and relevant documents

    International Nuclear Information System (INIS)

    1996-01-01

    This publication documents the technical basis which underlay the Interim Design Report, Cost Review and Safety Analysis submitted to the ITER Councils (IC-8 and IC-9) Records of decisions and the ''ITER Interim Design Report Package''. This publication contains ITER Site Requirements and ITER Site Design Assumptions, TAC-8 Report, SRG Report, CP's Report on Tentative Sequence of Events and Parties' Views on the IDR Package and Parties' Technical Comments on the IDR Package. Figs, tabs

  3. Tribal child welfare. Interim final rule.

    Science.gov (United States)

    2012-01-06

    The Administration for Children and Families (ACF) is issuing this interim final rule to implement statutory provisions related to the Tribal title IV-E program. Effective October 1, 2009, section 479B(b) of the Social Security Act (the Act) authorizes direct Federal funding of Indian Tribes, Tribal organizations, and Tribal consortia that choose to operate a foster care, adoption assistance and, at Tribal option, a kinship guardianship assistance program under title IV-E of the Act. The Fostering Connections to Success and Increasing Adoptions Act of 2008 requires that ACF issue interim final regulations which address procedures to ensure that a transfer of responsibility for the placement and care of a child under a State title IV-E plan to a Tribal title IV-E plan occurs in a manner that does not affect the child's eligibility for title IV-E benefits or medical assistance under title XIX of the Act (Medicaid) and such services or payments; in-kind expenditures from third-party sources for the Tribal share of administration and training expenditures under title IV-E; and other provisions to carry out the Tribal-related amendments to title IV-E. This interim final rule includes these provisions and technical amendments necessary to implement a Tribal title IV-E program.

  4. Presidential Transition: The Experience of Two Community College Interim Presidents

    Science.gov (United States)

    Thompson, Matthew D.

    2010-01-01

    The purpose of this qualitative case study was to understand the experiences of two community college interim presidents, their characteristics, and how they led institutions following an abrupt presidential departure. There were two fundamental questions framing this research study, 1. How do two interim community college presidents lead…

  5. 30 CFR 827.13 - Coal preparation plants: Interim performance standards.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Coal preparation plants: Interim performance...-COAL PREPARATION PLANTS NOT LOCATED WITHIN THE PERMIT AREA OF A MINE § 827.13 Coal preparation plants: Interim performance standards. (a) Persons operating or who have operated coal preparation plants after...

  6. Fast Flux Test Facility interim examination and maintenance cell: Past, present, and future

    International Nuclear Information System (INIS)

    Vincent, J.R.

    1990-09-01

    The Fast Flux Test Facility Interim Examination and Maintenance Cell was designed to perform interim examination and/or disassembly of experimental core components for final analysis elsewhere, as well as maintenance of sodium-wetted or neutron-activated internal reactor parts and plant support hardware. The Interim Examination and Maintenance Cell equipment developed and used for the first ten years of operation has been primarily devoted to the disassembly and examination of core component test assemblies. While no major reactor equipment has required remote repair or maintenance, the Interim Examina Examination and Maintenance Cell has served as the remote repair facility for its own in-cell equipment, and several innovative remote repairs have been accomplished. The Interim Examination and Maintenance Cell's demonstrated versatility has shown its capability to support a challenging future. 12 refs., 9 figs

  7. New York State interim waste management cost evaluation

    International Nuclear Information System (INIS)

    Ma, M.S.; Watts, R.J.; Jorgensen, J.R.; Rochester Gas and Electric Corp., NY)

    1985-01-01

    The purpose of this study is to investigate and quantify the comparative costs associated with including or excluding Class A utility wastes at a centralized interim waste management facility in New York State. The objective of the study is to assess the unit costs and total statewide costs associated with two distinct scenarios: (1) the case where non-utility Class A LLRW is received, incinerated and stored at the centralized interim facility, and utility Class A wastes are held without incineration at respective nuclear power plant interim onsite facilities without incineration; and (2) the alternative case where both utility and non-utility Class A wastes are accepted, incinerated and stored at the centralized facility. Unit costs to waste generators are estimated for each of the two cases described. This is followed by an estimation of the statewide cost impact to the public. The cost impact represents the cost differential resulting from the exclusion of utility Class A waste from the centralized NYS interim waste management facility. The principal factors comprising the cost differential include (1) higher unit disposal fees charged to non-utility waste generators, which are passed along in the costs of products and services; and (2) costs to utilities due to construction of additional onsite storage capacity, which in turn are charged to electric rate payers

  8. 216-T-4 interim stabilization final report

    International Nuclear Information System (INIS)

    Smith, D.L.

    1996-01-01

    This report provides a general description of the activities performed for the interim stabilization of the 216-T-4-1 ditch, 216-T-4-2 ditch, and 216-T-4-2 pond. Interim stabilization was required to reduce the amount of surface-contaminated acres and to minimize the migration of radioactive contamination. Work associated with the 216-T4-1 ditch and 216-T-4-2 pond was performed by the Radiation Area Remedial Action (RARA) Project. Work associated with the 216-T-4-2 ditch was done concurrently but was funded by Westinghouse Hanford Company (WHC) Tank Waste Remediation Systems (TWRS)

  9. Lessons for outsourcing and interim management relationships.

    Science.gov (United States)

    Macko, W; Kostyack, P T

    1999-01-01

    Few decisions can affect an organization more than the selection of an outsourcing or interim management partner. More and more health care organizations face such decisions in today's competitive market in order to face new business needs. Making these relationships successful can be important for health care organizations seeking competitive advantages or seeking immediately accessible management support. These relationships, however, require careful partner selection and development. Success in outsourcing and interim management relationships is contingent upon a thorough selection process, a strong contract that has clearly and explicitly detailed responsibilities and a culture-sensitive business rapport between the client and selected partner.

  10. PROJECT W-551 INTERIM PRETREATMENT SYSTEM PRECONCEPTUAL CANDIDATE TECHNOLOGY DESCRIPTIONS

    Energy Technology Data Exchange (ETDEWEB)

    MAY TH

    2008-08-12

    The Office of River Protection (ORP) has authorized a study to recommend and select options for interim pretreatment of tank waste and support Waste Treatment Plant (WTP) low activity waste (LAW) operations prior to startup of all the WTP facilities. The Interim Pretreatment System (IPS) is to be a moderately sized system which separates entrained solids and 137Cs from tank waste for an interim time period while WTP high level waste vitrification and pretreatment facilities are completed. This study's objective is to prepare pre-conceptual technology descriptions that expand the technical detail for selected solid and cesium separation technologies. This revision includes information on additional feed tanks.

  11. IRIS Toxicological Review of Ammonia (Revised External Review Draft)

    Science.gov (United States)

    In August 2013, EPA submitted a revised draft IRIS assessment of ammonia to the agency's Science Advisory Board (SAB) and posted this draft on the IRIS website. EPA had previously released a draft of the assessment for public comment, held a public meeting about the draft, and ...

  12. Do Interim Assessments Reduce the Race and SES Achievement Gaps?

    Science.gov (United States)

    Konstantopoulos, Spyros; Li, Wei; Miller, Shazia R.; van der Ploeg, Arie

    2017-01-01

    The authors examined differential effects of interim assessments on minority and low socioeconomic status students' achievement in Grades K-6. They conducted a large-scale cluster randomized experiment in 2009-2010 to evaluate the impact of Indiana's policy initiative introducing interim assessments statewide. The authors used 2-level models to…

  13. Interim Report by Asia International Grid Connection Study Group

    Science.gov (United States)

    Omatsu, Ryo

    2018-01-01

    The Asia International Grid Connection Study Group Interim Report examines the feasibility of developing an international grid connection in Japan. The Group has investigated different cases of grid connections in Europe and conducted research on electricity markets in Northeast Asia, and identifies the barriers and challenges for developing an international grid network including Japan. This presentation introduces basic contents of the interim report by the Study Group.

  14. 78 FR 19733 - Draft General Management Plan and Draft Environmental Impact Statement, Fort Raleigh National...

    Science.gov (United States)

    2013-04-02

    ... announce the dates, times, and locations of public meetings on the draft EIS/GMP through the NPS Planning... delivery to the above address. Electronic copies of the Draft EIS/GMP will be available online at http... through additional interpretive efforts, marketing, and facilities. Alternative C, the NPS preferred...

  15. The Interim Financial Reporting in the Spirit of the IAS 34 Norm

    OpenAIRE

    Ovidia Doinea

    2008-01-01

    The role of an interim financial reporting is to allow the information users to acknowledge the activity of an entity on period shorter than financial exercise from the perspective of the available profits and cash flows generated as well as from the point of view of its financial position and liquidity. The interim financial reporting includes a complete or condensed set of financial statements which target to update the last financial reporting, usually the annual report. The interim financ...

  16. 77 FR 74508 - Notice of Availability of the Draft Resource Management Plan Amendment, Draft Environmental...

    Science.gov (United States)

    2012-12-14

    ... eliminated. A maximum of 7,500 summer and winter landings would be permitted in the project area annually... considered, the BLM must receive written comments on the Draft RMP Amendment/Draft EIS within 90 days... meetings or hearings and any other public involvement activities at least 15 days in advance through public...

  17. Report of the first interim meeting of the Seabed Working Group Engineering Studies Task Group

    International Nuclear Information System (INIS)

    Talbert, D.M.

    1982-02-01

    The first interim meeting of the Engineering Studies Task Group (ESTG) was held at the Delft Soil Mechanics Laboratory, Delft, The Netherlands, on 21-24 September 1981. The main business of the meeting was the development of a network analysis for the ESTG. Significant progress was made; however, substantial further development remains to be accomplished. Other items discussed were (1) progress relevant to engineering studies made in the various national programs since the sixth annual meeting of the Seabed Working Group (SWG) held in Paris, February, 1981; (2) the ESTG Boundary Conditions and Scope of Work as previously defined at the Paris meeting; (3) the Draft II SWG Five-Year Plan; (4) the deep ocean drilling proposal made by the Site Selection Task Group at the Paris meeting and expanded upon at their May, 1981, meeting; and (5) a recent compilation of data from the Nares Abyssal Plain arising from the US Program studies. Finally, consideration was given to a plan for continued work by the ESTG. A brief discussion of the principal items is given. The current state of the network analysis is shown

  18. 76 FR 57760 - Notice of Availability of Draft Resource Management Plan and Draft Environmental Impact Statement...

    Science.gov (United States)

    2011-09-16

    ... approximately 707,000 subsurface acres of Federal mineral estate. Decisions in the Colorado River Valley RMP... Availability of Draft Resource Management Plan and Draft Environmental Impact Statement for the Colorado River Valley Field Office, Colorado AGENCY: Bureau of Land Management, Interior. ACTION: Notice of availability...

  19. Transuranic waste storage and assay facility (TRUSAF) interim safety basis

    International Nuclear Information System (INIS)

    Gibson, K.D.

    1995-09-01

    The TRUSAF ISB is based upon current facility configuration and procedures. The purpose of the document is to provide the basis for interim operation or restrictions on interim operations and the authorization basis for the TRUSAF at the Hanford Site. The previous safety analysis document TRUSAF hazards Identification and Evaluation (WHC 1977) is superseded by this document

  20. 77 FR 5528 - Trust Land Consolidation Draft Plan

    Science.gov (United States)

    2012-02-03

    ... DEPARTMENT OF THE INTERIOR Office of the Secretary Trust Land Consolidation Draft Plan AGENCY... draft plan for accomplishing these goals. DATES: Submit comments by March 19, 2012. ADDRESSES: Send comments on the draft plan to: Elizabeth Appel, Bureau of Indian Affairs, 1001 Indian School Road NW...

  1. Commentary: Interim leadership of academic departments at U.S. medical schools.

    Science.gov (United States)

    Grigsby, R Kevin; Aber, Robert C; Quillen, David A

    2009-10-01

    Medical schools and teaching hospitals are experiencing more frequent turnover of department chairs. Loss of a department chair creates instability in the department and may have a negative effect on the organization at large. Interim leadership of academic departments is common, and interim chairs are expected to immediately demonstrate skills and leadership abilities. However, little is known about how persons are prepared to assume the interim chair role. Newer competencies for effective leadership include an understanding of the business of medicine, interpersonal and communication skills, the ability to deal with conflict and solve adaptive challenges, and the ability to build and work on teams. Medical schools and teaching hospitals need assistance to meet the unique training and support needs of persons serving as interim leaders. For example, the Association of American Medical Colleges and individual chair societies can develop programs to allow current chairs to reflect on their present positions and plan for the future. Formal leadership training, mentorship opportunities, and conscientious succession planning are good first steps in preparing to meet the needs of academic departments during transitions in leadership. Also, interim leadership experience may be useful as a means for "opening the door" to underrepresented persons, including women, and increasing the diversity of the leadership team.

  2. 78 FR 20690 - Draft Environmental Impact Statement, Draft Habitat Conservation Plan, Draft Programmatic...

    Science.gov (United States)

    2013-04-05

    .... Background The Fowler Ridge application is unusual in that 355 wind turbines are already in place and have... Agreement, and Draft Implementing Agreement; Application for an Incidental Take Permit, Fowler Ridge Wind... application from Fowler Ridge Wind Farm LLC, Fowler Ridge II Wind Farm LLC, Fowler Ridge III Wind Farm LLC...

  3. K basins interim remedial action health and safety plan

    Energy Technology Data Exchange (ETDEWEB)

    DAY, P.T.

    1999-09-14

    The K Basins Interim Remedial Action Health and Safety Plan addresses the requirements of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), as they apply to the CERCLA work that will take place at the K East and K West Basins. The provisions of this plan become effective on the date the US Environmental Protection Agency issues the Record of Decision for the K Basins Interim Remedial Action, currently planned in late August 1999.

  4. Interim safety basis for fuel supply shutdown facility

    International Nuclear Information System (INIS)

    Brehm, J.R.; Deobald, T.L.; Benecke, M.W.; Remaize, J.A.

    1995-01-01

    This ISB in conjunction with the new TSRs, will provide the required basis for interim operation or restrictions on interim operations and administrative controls for the Facility until a SAR is prepared in accordance with the new requirements. It is concluded that the risk associated with the current operational mode of the Facility, uranium closure, clean up, and transition activities required for permanent closure, are within Risk Acceptance Guidelines. The Facility is classified as a Moderate Hazard Facility because of the potential for an unmitigated fire associated with the uranium storage buildings

  5. 76 FR 59155 - Notice of Availability of South Coast Draft Resource Management Plan Revision and Draft...

    Science.gov (United States)

    2011-09-23

    ... policies and emphasis on the management of public lands and local land use planning; and new data that have... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLCAD06000, L16100000.DP0000] Notice of Availability of South Coast Draft Resource Management Plan Revision and Draft Environmental Impact Statement...

  6. Cluster: Drafting. Course: Introduction to Technical Drafting.

    Science.gov (United States)

    Sanford - Lee County Schools, NC.

    The set of 10 units is designed for use with an instructor as an introduction to technical drafting, and is also keyed to other texts. Each unit contains several task packages specifying prerequisites, rationale for learning, objectives, learning activities to be supervised by the instructor, and learning practice. The units cover: drafting…

  7. Immobilized high-level waste interim storage alternatives generation and analysis and decision report

    International Nuclear Information System (INIS)

    CALMUS, R.B.

    1999-01-01

    This report presents a study of alternative system architectures to provide onsite interim storage for the immobilized high-level waste produced by the Tank Waste Remediation System (TWRS) privatization vendor. It examines the contract and program changes that have occurred and evaluates their impacts on the baseline immobilized high-level waste (IHLW) interim storage strategy. In addition, this report documents the recommended initial interim storage architecture and implementation path forward

  8. 19 CFR 207.63 - Circulation of draft questionnaires.

    Science.gov (United States)

    2010-04-01

    ... 19 Customs Duties 3 2010-04-01 2010-04-01 false Circulation of draft questionnaires. 207.63... SUBSIDIZED EXPORTS TO THE UNITED STATES Five-Year Reviews § 207.63 Circulation of draft questionnaires. (a) The Director shall circulate draft questionnaires to the parties for comment in each full review. (b...

  9. 10 CFR 51.81 - Distribution of draft environmental impact statement.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Distribution of draft environmental impact statement. 51...-Regulations Implementing Section 102(2) Draft Environmental Impact Statements-Materials Licenses § 51.81 Distribution of draft environmental impact statement. Copies of the draft environmental impact statement and...

  10. 10 CFR 51.86 - Distribution of draft environmental impact statement.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Distribution of draft environmental impact statement. 51...-Regulations Implementing Section 102(2) Draft Environmental Impact Statements-Rulemaking § 51.86 Distribution of draft environmental impact statement. Copies of the draft environmental impact statement and any...

  11. The Physics of Bump Drafting in Car Racing

    Science.gov (United States)

    Fiolhais, Miguel C. N.; Amor dos Santos, Susana

    2014-01-01

    The technique of bump drafting, also known as two-car drafting in motorsports, is analysed in the framework of Newtonian mechanics and simple aerodynamic drag forces. As an apparent unnatural effect that often pleases the enthusiasts of car racing, bump drafting provides a unique pedagogical opportunity for students to gain insights into the…

  12. Report of the Fourth interim meeting of the Seabed Working Group Engineering Studies Task Group, 3-6 October 1983, at Rijks Geologische Dienst, Haarlem, The Netherlands

    International Nuclear Information System (INIS)

    Talbert, D.M.

    1984-06-01

    This report presents the results of the fourth interim meeting of the Seabed Working Group's (SWG) Engineering Studies Task Group (ESTG). This task group is charged with determining whether the engineering technology exists to emplace waste canisters in deep ocean sediments. The fourth interim meeting, held at Rijks Geologische Dienst, Haarlem, The Netherlands, 3-6 October 1983, reviewed progress made by the various national programs since the ESTG third interim meeting (July 1982) and developed a table of requirements for processing samples for a geotechnical properties data base. Other items addressed were (1) potential methods of instrumenting penetrators to obtain in situ measurements, (2) procedures for evaluating and quantifying the disturbed zone created by an emplaced penetrator, (3) review and modification of the current draft version of the SWG Five-Year Plan, (4) review and extension of the ESTG detailed plan for penetrator tests, and (5) details of the penetrator tests scheduled for March 1984 in the Nares Abyssal Plain using the research vessel M/V TYRO. The review of the national programs indicated significant progress when measured against the integrated ESTG five-year plan which results in a joint evaluation of engineering feasibility of subseabed disposal based upon (1) a demonstration of an emplacement capability, (2) an evaluation of the zone of sediment disturbance created during emplacement, (3) the existence of acceptable emplacement models, and (4) an acceptable engineering data base. A table of geotechnical sample-processing requirements is being developed to provide guidance for the other task groups that may have the opportunity to furnish suitable geotechnical samples to the ESTG as well as to provide some measure of consistency within the ESTG for the development of the engineering data base for the SWG study areas

  13. In vitro evaluation of the marginal integrity of CAD/CAM interim crowns.

    Science.gov (United States)

    Kelvin Khng, Kwang Yong; Ettinger, Ronald L; Armstrong, Steven R; Lindquist, Terry; Gratton, David G; Qian, Fang

    2016-05-01

    The accuracy of interim crowns made with computer-aided design and computer-aided manufacturing (CAD/CAM) systems has not been well investigated. The purpose of this in vitro study was to evaluate the marginal integrity of interim crowns made by CAD/CAM compared with that of conventional polymethylmethacrylate (PMMA) crowns. A dentoform mandibular left second premolar was prepared for a ceramic crown and scanned for the fabrication of 60 stereolithical resin dies, half of which were scanned to fabricate 15 Telio CAD-CEREC and 15 Paradigm MZ100-E4D-E4D crowns. Fifteen Caulk and 15 Jet interim crowns were made on the remaining resin dies. All crowns were cemented with Tempgrip under a 17.8-N load, thermocycled for 1000 cycles, placed in 0.5% acid fuschin for 24 hours, and embedded in epoxy resin before sectioning from the mid-buccal to mid-lingual surface. The marginal discrepancy was measured using a traveling microscope, and dye penetration was measured as a percentage of the overall length under the crown. The mean vertical marginal discrepancy of the conventionally made interim crowns was greater than for the CAD/CAM crowns (P=.006), while no difference was found for the horizontal component (P=.276). The mean vertical marginal discrepancy at the facial surface of the Caulk crowns was significantly greater than that of the other 3 types of interim crowns (Pmargin, the mean horizontal component of the Telio crowns was significantly larger than that of the other 3 types, with no difference at the lingual margins (P=.150). The mean percentage dye penetration for the Paradigm MZ100-E4D crowns was significantly greater and for Jet crowns significantly smaller than for the other 3 crowns (Pmarginal discrepancies of the Jet interim crowns at the facial surface and with the horizontal marginal discrepancies of the Caulk interim crowns at the lingual surface (Pmarginal discrepancy was found with the interim crowns fabricated by CAD/CAM as compared with PMMA crowns

  14. 10 CFR 51.80 - Draft environmental impact statement-materials license.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Draft environmental impact statement-materials license. 51...-Regulations Implementing Section 102(2) Draft Environmental Impact Statements-Materials Licenses § 51.80 Draft environmental impact statement—materials license. (a) The NRC staff will either prepare a draft environmental...

  15. Project management plan for Reactor 105-C Interim Safe Storage project

    International Nuclear Information System (INIS)

    Plagge, H.A.

    1996-09-01

    Reactor 105-C (located on the Hanford Site in Richland, Washington) will be placed into an interim safe storage condition such that (1) interim inspection can be limited to a 5-year frequency; (2) containment ensures that releases to the environmental are not credible under design basis conditions; and (3) final safe storage configuration shall not preclude or significantly increase the cost for any decommissioning alternatives for the reactor assembly.This project management plan establishes plans, organizational responsibilities, control systems, and procedures for managing the execution of Reactor 105-C interim safe storage activities to meet programmatic requirements within authorized funding and approved schedules

  16. Improvement of hydro-turbine draft tube efficiency using vortex generator

    Directory of Open Access Journals (Sweden)

    Xiaoqing Tian

    2015-07-01

    Full Text Available Computational fluid dynamics simulation was employed in a hydraulic turbine (from inlet tube to draft tube. The calculated turbine efficiencies were compared with measured results, and the relative error is 1.12%. In order to improve the efficiency of the hydraulic turbine, 15 kinds of vortex generators were installed at the vortex development section of the draft tube, and all of them were simulated using the same method. Based on the turbine efficiencies, distribution of streamlines, velocities, and pressures in the draft tube, an optimal draft tube was found, which can increase the efficiency of this hydraulic turbine more than 1.5%. The efficiency of turbine with the optimal draft tube, draft tube with four pairs of middle-sized vortex generator, and draft tube without vortex generator under different heads of turbine (5–14 m was calculated, and it was verified that these two kinds of draft tubes can increase the efficiency of this turbine in every situation.

  17. Interim FDG-PET Scan in Hodgkin's Lymphoma: Hopes and Caveats

    Directory of Open Access Journals (Sweden)

    M. André

    2011-01-01

    Full Text Available FDG-PET has recently emerged as an important tool for the management of Hodgkins lymphoma. Although its use for initial staging and response evaluation at the end of treatment is well established, the place of interim PET for response assessment and subsequent treatment tailoring is still quite controversial. The use of interim PET after a few cycles of chemotherapy may allow treatment reduction for good responders, leading to lesser treatment toxicities as well as early treatment adaptation for bad responders with a potential higher chance for cure. Interpretation of interim PET is a rapidly moving field. Actually, visual interpretation is preferred over quantitative interpretation in this situation. The notion of minimal residual uptake emerged for faint persisting FDG uptake, but has evolved during the recent years. Guidelines using mediastinum and liver as references have been proposed at the expert meeting in Deauville 2009. Actually, several trials are ongoing both for localised and advanced disease to evaluate the FDG-PET potential for early treatment monitoring and tailoring. Until the results of these prospective randomized trials become available, treatment changes according to the interim PET results should remain inappropriate and limited to well-conducted clinical trials.

  18. Orientation, Sketching, Mechanical Drawing, Drafting--Basic: 9253.01.

    Science.gov (United States)

    Dade County Public Schools, Miami, FL.

    The course introduces the student to the drafting trade, freehand sketching, and basic mechanical drawing. The course has no prerequisites and will guide the student into drafting concepts and serve as a foundation for further study in vocational drafting. Requiring a total of 45 class hours, eight hours are utilized in orientation, 15 hours are…

  19. 42 CFR 93.401 - Interaction with other offices and interim actions.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Interaction with other offices and interim actions. 93.401 Section 93.401 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES... Human Services General Information § 93.401 Interaction with other offices and interim actions. (a) ORI...

  20. 42 CFR 417.572 - Budget and enrollment forecast and interim reports.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 3 2010-10-01 2010-10-01 false Budget and enrollment forecast and interim reports... PLANS, AND HEALTH CARE PREPAYMENT PLANS Medicare Payment: Cost Basis § 417.572 Budget and enrollment forecast and interim reports. (a) Annual submittal. The HMO or CMP must submit an annual operating budget...

  1. Early interim 18F-FDG PET in Hodgkin's lymphoma: evaluation on 304 patients

    International Nuclear Information System (INIS)

    Zinzani, Pier Luigi; Stefoni, Vittorio; Broccoli, Alessandro; Argnani, Lisa; Baccarani, Michele; Rigacci, Luigi; Puccini, Benedetta; Castagnoli, Antonio; Vaggelli, Luca; Zanoni, Lucia; Fanti, Stefano

    2012-01-01

    The use of early (interim) PET restaging during first-line therapy of Hodgkin's lymphoma (HL) in clinical practice has considerably increased because of its ability to provide early recognition of treatment failure allowing patients to be transferred to more intensive treatment regimens. Between June 1997 and June 2009, 304 patients with newly diagnosed HL (147 early stage and 157 advanced stage) were treated with the ABVD regimen at two Italian institutions. Patients underwent PET staging and restaging at baseline, after two cycles of therapy and at the end of the treatment. Of the 304 patients, 53 showed a positive interim PET scan and of these only 13 (24.5%) achieved continuous complete remission (CCR), whereas 251 patients showed a negative PET scan and of these 231 (92%) achieved CCR. Comparison between interim PET-positive and interim PET-negative patients indicated a significant association between PET findings and 9-year progression-free survival and 9-year overall survival, with a median follow-up of 31 months. Among the early-stage patients, 19 had a positive interim PET scan and only 4 (21%) achieved CCR; among the 128 patients with a negative interim PET scan, 122 (97.6%) achieved CCR. Among the advanced-stage patients, 34 showed a persistently positive PET scan with only 9 (26.4%) achieving CCR, whereas 123 showed a negative interim PET scan with 109 (88.6%) achieving CCR. Our results demonstrate the role of an early PET scan as a significant step forward in the management of patients with early-stage or advanced-stage HL. (orig.)

  2. 10 CFR 431.401 - Petitions for waiver, and applications for interim waiver, of test procedure.

    Science.gov (United States)

    2010-01-01

    ... Renewable Energy, U.S. Department of Energy. Each Application for Interim Waiver must reference the Petition... Renewable Energy. (e) Provisions specific to interim waivers—(1) Disposition of application. If... 10 Energy 3 2010-01-01 2010-01-01 false Petitions for waiver, and applications for interim waiver...

  3. Fit of interim crowns fabricated using photopolymer-jetting 3D printing.

    Science.gov (United States)

    Mai, Hang-Nga; Lee, Kyu-Bok; Lee, Du-Hyeong

    2017-08-01

    The fit of interim crowns fabricated using 3-dimensional (3D) printing is unknown. The purpose of this in vitro study was to evaluate the fit of interim crowns fabricated using photopolymer-jetting 3D printing and to compare it with that of milling and compression molding methods. Twelve study models were fabricated by making an impression of a metal master model of the mandibular first molar. On each study model, interim crowns (N=36) were fabricated using compression molding (molding group, n=12), milling (milling group, n=12), and 3D polymer-jetting methods. The crowns were prepared as follows: molding group, overimpression technique; milling group, a 5-axis dental milling machine; and polymer-jetting group using a 3D printer. The fit of interim crowns was evaluated in the proximal, marginal, internal axial, and internal occlusal regions by using the image-superimposition and silicone-replica techniques. The Mann-Whitney U test and Kruskal-Wallis tests were used to compare the results among groups (α=.05). Compared with the molding group, the milling and polymer-jetting groups showed more accurate results in the proximal and marginal regions (P3D printing significantly enhanced the fit of interim crowns, particularly in the occlusal region. Copyright © 2016 Editorial Council for the Journal of Prosthetic Dentistry. Published by Elsevier Inc. All rights reserved.

  4. Optimum Drafting Conditions Of Polyester And Viscose Blend Yarns

    Directory of Open Access Journals (Sweden)

    Hatamvand Mohammad

    2017-09-01

    Full Text Available In this study, we used an experimental design to investigate the influence of the total draft, break draft, distance between the aprons (Clips and production roller pressure on yarn quality in order to obtain optimum drafting conditions for polyester and viscose (PES/CV blend yarns in ring spinning frame. We used PES fibers (1.4 dtex × 38 mm long and CV fibers (1.6 dtex × 38 mm long to spin a 20 Tex blend yarn of PES (70%/CV (30% blend ratio. When the break draft, adjustment of distance between of aprons and roller pressure is not reasonable, controlling and leading of the fibers is not sufficient for proper orientation of the fibers in the yarn structure to produce a high quality yarn. Experimental results and statistical analysis show that the best yarn quality will be obtained under drafting conditions total draft of 38, 1.2 break draft, 2.8 mm distance between of aprons and maximum pressure of the production top roller (18daN.

  5. 10 CFR 51.85 - Draft environmental impact statement-rulemaking.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Draft environmental impact statement-rulemaking. 51.85... Implementing Section 102(2) Draft Environmental Impact Statements-Rulemaking § 51.85 Draft environmental impact... Commission has determined to prepare an environmental impact statement. ...

  6. A Non-Traditional Interim Project.

    Science.gov (United States)

    Brown, Diane; Ward, Dorothy

    1980-01-01

    Describes a project initiated by the Foreign Language Department of Birmingham-Southern College for their Interim term and discusses an interdisciplinary course focusing on Medieval Europe. The course included presentations on German and French language and literature, as well as lectures on the arts, philosophy, and family life of the period.…

  7. Assessing risk of draft survey by AHP method

    Science.gov (United States)

    Xu, Guangcheng; Zhao, Kuimin; Zuo, Zhaoying; Liu, Gang; Jian, Binguo; Lin, Yan; Fan, Yukun; Wang, Fei

    2018-04-01

    The paper assesses the risks of vessel floating in the seawater for draft survey by using the analytic hierarchy process. On this basis, the paper established draft survey risk index from the view of draft reading, ballast water, fresh water, and calculation process and so on. Then the paper proposes the method to deal with risk assessment using one concrete sample.

  8. On the Drafting of Confidentiality Agreements

    DEFF Research Database (Denmark)

    Drewsen, Merete; Lando, Henrik; Cummins, Tim

    2006-01-01

    This is not a theoretical paper but an application of existing law and economic contract theory to the issue of how to draft a specific kind of contract. It is addressed to practitioners and is intended for practical use. It will be part of a Wiki (as in Wikipedia) for contract drafting, which...

  9. Interim and final storage casks

    International Nuclear Information System (INIS)

    Stumpfrock, L.; Kockelmann, H.

    2012-01-01

    The disposal of radioactive waste is a huge social challenge in Germany and all over the world. As is well known the search for a site for a final repository for high-level waste in Germany is not complete. Therefore, interim storage facilities for radioactive waste were built at plant sites in Germany. The waste is stored in these storage facilities in appropriate storage and transport casks until the transport in a final repository can be carried out. Licensing of the storage and transport casks aimed for use in the public space is done according to the traffic laws and for handling in the storage facility according to nuclear law. Taking into account the activity of the waste to be stored, different containers are in use, so that experience is available from the licensing and operation in interim storage facilities. The large volume of radioactive waste to be disposed of after the shut-down of power generation in nuclear power stations makes it necessary for large quantities of licensed storage and transport casks to be provided soon.

  10. Interim storage report

    International Nuclear Information System (INIS)

    Rawlins, J.K.

    1998-02-01

    High-level radioactive waste (HLW) stored at the Idaho Chemical Processing Plant (ICPP) in the form of calcine and liquid and liquid sodium-bearing waste (SBW) will be processed to provide a stable waste form and prepare the waste to be transported to a permanent repository. Because a permanent repository will not be available when the waste is processed, the waste must be stored at ICPP in an Interim Storage Facility (ISF). This report documents consideration of an ISF for each of the waste processing options under consideration

  11. 10 CFR 51.70 - Draft environmental impact statement-general.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Draft environmental impact statement-general. 51.70... Implementing Section 102(2) Environmental Impact Statements § 51.70 Draft environmental impact statement—general. (a) The NRC staff will prepare a draft environmental impact statement as soon as practicable...

  12. 10 CFR 51.71 - Draft environmental impact statement-contents.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Draft environmental impact statement-contents. 51.71... Implementing Section 102(2) Environmental Impact Statements § 51.71 Draft environmental impact statement—contents. (a) Scope. The draft environmental impact statement will be prepared in accordance with the scope...

  13. ITER interim design report package documents

    International Nuclear Information System (INIS)

    1996-01-01

    This publication contains the Excerpt from the ITER Council (IC-8), the ITER Interim Design Report, Cost Review and Safety Analysis, ITER Site Requirements and ITER Site Design Assumptions and the Excerpt from the ITER Council (IC-9). 8 figs, 2 tabs

  14. Accuracy of professional sports drafts in predicting career potential.

    Science.gov (United States)

    Koz, D; Fraser-Thomas, J; Baker, J

    2012-08-01

    The forecasting of talented players is a crucial aspect of building a successful sports franchise and professional sports invest significant resources in making player choices in sport drafts. The current study examined the relationship between career performance (i.e. games played) and draft round for the National Football League, National Hockey League, National Basketball League, and Major League Baseball for players drafted from 1980 to 1989 (n = 4874) against the assumption of a linear relationship between performance and draft round (i.e. that players with the most potential will be selected before players of lower potential). A two-step analysis revealed significant differences in games played across draft rounds (step 1) and a significant negative relationship between draft round and games played (step 2); however, the amount of variance accounted for was relatively low (less than 17%). Results highlight the challenges of accurately evaluating amateur talent. © 2011 John Wiley & Sons A/S.

  15. Spent fuel interim storage

    International Nuclear Information System (INIS)

    Bilegan, Iosif C.

    2003-01-01

    The official inauguration of the spent fuel interim storage took place on Monday July 28, 2003 at Cernavoda NNP. The inaugural event was attended by local and central public authority representatives, a Canadian Government delegation as well as newsmen from local and central mass media and numerous specialists from Cernavoda NPP compound. Mr Andrei Grigorescu, State Secretary with the Economy and Commerce Ministry, underlined in his talk the importance of this objective for the continuous development of nuclear power in Romania as well as for Romania's complying with the EU practice in this field. Also the excellent collaboration between the Canadian contractor AECL and the Romanian partners Nuclear Montaj, CITON, UTI, General Concret in the accomplishment of this unit at the planned terms and costs. On behalf of Canadian delegation, spoke Minister Don Boudria. He underlined the importance which the Canadian Government affords to the cooperation with Romania aiming at specific objectives in the field of nuclear power such as the Cernavoda NPP Unit 2 and spent fuel interim storage. After traditional cutting of the inaugural ribbon by the two Ministers the festivities continued on the Cernavoda NPP Compound with undersigning the documents regarding the project completion and a press conference

  16. A randomized controlled trial of interim methadone maintenance.

    Science.gov (United States)

    Schwartz, Robert P; Highfield, David A; Jaffe, Jerome H; Brady, Joseph V; Butler, Carol B; Rouse, Charles O; Callaman, Jason M; O'Grady, Kevin E; Battjes, Robert J

    2006-01-01

    Effective alternatives to long waiting lists for entry into methadone hydrochloride maintenance treatment are needed to reduce the complications of continuing heroin dependence and to increase methadone treatment entry. To compare the effectiveness of interim methadone maintenance with that of the usual waiting list condition in facilitating methadone treatment entry and reducing heroin and cocaine use and criminal behavior. Randomized, controlled, clinical trial using 2 conditions, with treatment assignment on a 3:2 basis to interim maintenance-waiting list control. A methadone treatment program in Baltimore. A total of 319 individuals meeting the criteria for current heroin dependence and methadone maintenance treatment. Participants were randomly assigned to either interim methadone maintenance, consisting of an individually determined methadone dose and emergency counseling only for up to 120 days, or referral to community-based methadone treatment programs. Entry into comprehensive methadone maintenance therapy at 4 months from baseline; self-reported days of heroin use, cocaine use, and criminal behavior; and number of urine drug test results positive for heroin and cocaine at the follow-up interview conducted at time of entry into comprehensive methadone treatment (or at 4 months from baseline for participants who did not enter regular treatment). Significantly more participants assigned to the interim methadone maintenance condition entered comprehensive methadone maintenance treatment by the 120th day from baseline (75.9%) than those assigned to the waiting list control condition (20.8%) (Pmethadone maintenance results in a substantial increase in the likelihood of entry into comprehensive treatment, and is an effective means of reducing heroin use and criminal behavior among opioid-dependent individuals awaiting entry into a comprehensive methadone treatment program.

  17. Effectiveness of interim stage filter in the exhaust system of glove boxes

    International Nuclear Information System (INIS)

    Patre, D.K.; Vangara, H.; Thanamani, S.; Gopalakrishnan, R.K.; Mhatre, Amol M.

    2018-01-01

    All operations in radiochemical laboratories are carried out in containment systems like Glove boxes and Fume hoods. For controlling air contamination two separate air cleaning systems are incorporated. Laboratory has general ventilation system and glove boxes are provided with a negative pressure system (NPS). Glove box exhaust air is passed through three stage filtration systems: in situ, interim and final before discharging to the atmosphere. In addition to the individual HEPA filters of each glove box, there is an interim HEPA filter bank introduced at the laboratory end. This was introduced to reduce a load on main exhaust filter system. Finally the exhaust air is discharged through the final stage HEPA filter located in the filter house through the Stack. The interim HEPA filter bank provides additional protection for the release of particulate activity and reduces load on the final stage filters. In the present work efforts have been put to validate the interim stage filter, which has been introduced, to limit the environmental release

  18. Cluster: Drafting. Course: Basic Technical Drafting. Research Project.

    Science.gov (United States)

    Sanford - Lee County Schools, NC.

    The set of six units is designed for use with an instructor in basic technical drafting and is also keyed to other texts. Each unit contains several task packages specifying prerequisites, rationale for learning, objectives, learning activities to be supervised by the instructor, and learning practice. The units cover: pictorial drawing; screw…

  19. LANDFILL BIOREACTOR PERFORMANCE, SECOND INTERIM REPORT

    Science.gov (United States)

    A bioreactor landfill is a landfill that is operated in a manner that is expected to increase the rate and extent of waste decomposition, gas generation, and settlement compared to a traditional landfill. This Second Interim Report was prepared to provide an interpretation of fie...

  20. DOE UST interim subsurface barrier technologies workshop

    International Nuclear Information System (INIS)

    1992-09-01

    This document contains information which was presented at a workshop regarding interim subsurface barrier technologies that could be used for underground storage tanks, particularly the tank 241-C-106 at the Hanford Reservation

  1. A conservative method of retaining an interim obturator for a total maxillectomy patient

    Directory of Open Access Journals (Sweden)

    Nirmal Famila Bettie

    2017-01-01

    Full Text Available Interim obturators are indicated during the postsurgical phases. It promotes surgical healing and serves as a temporary prosthesis to rehabilitate a patient with intra-oral surgical defect. Retention is gained by wiring, surgical suturing, and other noninvasive methods to enable functional rehabilitation and easy replacement with a permanent obturator. Interim obturators serve as an easy guide for replacing with definitive obturators by indicating prosthesis extensions and the required method of retention. A more conservative and noninvasive method of retaining an interim obturator for a maxillectomy patient is described in this case report.

  2. A Conservative Method of Retaining an Interim Obturator for a Total Maxillectomy Patient.

    Science.gov (United States)

    Bettie, Nirmal Famila

    2017-11-01

    Interim obturators are indicated during the postsurgical phases. It promotes surgical healing and serves as a temporary prosthesis to rehabilitate a patient with intra-oral surgical defect. Retention is gained by wiring, surgical suturing, and other noninvasive methods to enable functional rehabilitation and easy replacement with a permanent obturator. Interim obturators serve as an easy guide for replacing with definitive obturators by indicating prosthesis extensions and the required method of retention. A more conservative and noninvasive method of retaining an interim obturator for a maxillectomy patient is described in this case report.

  3. International validation study for interim PET in ABVD-treated, advanced-stage hodgkin lymphoma

    DEFF Research Database (Denmark)

    Biggi, Alberto; Gallamini, Andrea; Chauvie, Stephane

    2013-01-01

    At present, there are no standard criteria that have been validated for interim PET reporting in lymphoma. In 2009, an international workshop attended by hematologists and nuclear medicine experts in Deauville, France, proposed to develop simple and reproducible rules for interim PET reporting...... in lymphoma. Accordingly, an international validation study was undertaken with the primary aim of validating the prognostic role of interim PET using the Deauville 5-point score to evaluate images and with the secondary aim of measuring concordance rates among reviewers using the same 5-point score...

  4. Brief Comment on the Draft Land Administration, Use, Registration ...

    African Journals Online (AJOL)

    D_Behailu

    The draft 'Land Administration, Use, Registration and Plan Proclamation (2007. EC)' has been in circulation for a while now. One of the prime objectives of the draft law is to address various counterproductive restrictions in the current federal land proclamation. According to its preamble, the draft aspires to expand the rights ...

  5. Report on bioventing of petroleum contaminated soils at 108-3C: Active extraction and passive injection (barometric pumping) of a gaseous nutrient

    International Nuclear Information System (INIS)

    Kastner, J.R.; Lombard, K.; Radway, J.

    1997-01-01

    A bioventing system was constructed with horizontal extraction wells and vertical injection wells in an area which had previously been excavated and then backfilled. Initial in-situ respiration rates (air addition only) suggest that hydrocarbon degradation may be nutrient limited. The rate of TPH degradation was maximum (0.8-1.2 mg/kg/day) between 10-15 ft (bgs), but dropped to essentially zero 30 ft (bgs) within the contaminated zone (even though previous analysis at this depth indicated a TPH concentration of 3800 ppm). Analysis of the soil at 17 ft showed that NO 3 and PO 4 were below detection limits (0.5 ppm), indicating that nutrient limitation may be occurring. Nitrate levels were highest at 10 ft (bgs), correlating with the highest respiration rates. However, phosphate levels were at/or below detection levels throughout tile site (indicating possible PO 4 limitation). Viable cells increased from 3 x 10 6 cfu/g at 3 ft (bgs) to 1 x 10 7 cfu/g at 10 ft (bgs) and remained relatively constant down to 17 ft. Cell numbers in the control area were significantly lower than in the contaminated zone (4.5 x 10 3 ). Gas phase nutrients (triethlyphosphate and nitrous oxide) will be injected to see if the hydrocarbon degradation rate can be increased

  6. 78 FR 41125 - Interim Enforcement Policy for Permanent Implant Brachytherapy Medical Event Reporting

    Science.gov (United States)

    2013-07-09

    ... NUCLEAR REGULATORY COMMISSION [NRC-2013-0114] Interim Enforcement Policy for Permanent Implant Brachytherapy Medical Event Reporting AGENCY: Nuclear Regulatory Commission. ACTION: Policy statement; revision. SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is issuing an interim Enforcement Policy that allows...

  7. Staff supplement to the draft report on human engineering guide to control room evaluation: response to comments, sample checklist, draft systems review guidelines, and evaluation procedures

    International Nuclear Information System (INIS)

    1981-03-01

    This staff supplement to Draft Report NUREG/CR-1580, Human Engineering Guide to Control Room Evaluation, provides staff responses to comments on the draft report and supplemental material not provided in the draft report. The supplemental material includes new draft guidelines for the systems review of nuclear power plant control rooms and sample checklists and corresponding human engineering guidelines

  8. Predictive probability methods for interim monitoring in clinical trials with longitudinal outcomes.

    Science.gov (United States)

    Zhou, Ming; Tang, Qi; Lang, Lixin; Xing, Jun; Tatsuoka, Kay

    2018-04-17

    In clinical research and development, interim monitoring is critical for better decision-making and minimizing the risk of exposing patients to possible ineffective therapies. For interim futility or efficacy monitoring, predictive probability methods are widely adopted in practice. Those methods have been well studied for univariate variables. However, for longitudinal studies, predictive probability methods using univariate information from only completers may not be most efficient, and data from on-going subjects can be utilized to improve efficiency. On the other hand, leveraging information from on-going subjects could allow an interim analysis to be potentially conducted once a sufficient number of subjects reach an earlier time point. For longitudinal outcomes, we derive closed-form formulas for predictive probabilities, including Bayesian predictive probability, predictive power, and conditional power and also give closed-form solutions for predictive probability of success in a future trial and the predictive probability of success of the best dose. When predictive probabilities are used for interim monitoring, we study their distributions and discuss their analytical cutoff values or stopping boundaries that have desired operating characteristics. We show that predictive probabilities utilizing all longitudinal information are more efficient for interim monitoring than that using information from completers only. To illustrate their practical application for longitudinal data, we analyze 2 real data examples from clinical trials. Copyright © 2018 John Wiley & Sons, Ltd.

  9. Pathways to deep decarbonization - Interim 2014 Report

    International Nuclear Information System (INIS)

    2014-01-01

    The interim 2014 report by the Deep Decarbonization Pathways Project (DDPP), coordinated and published by IDDRI and the Sustainable Development Solutions Network (SDSN), presents preliminary findings of the pathways developed by the DDPP Country Research Teams with the objective of achieving emission reductions consistent with limiting global warming to less than 2 deg. C. The DDPP is a knowledge network comprising 15 Country Research Teams and several Partner Organizations who develop and share methods, assumptions, and findings related to deep decarbonization. Each DDPP Country Research Team has developed an illustrative road-map for the transition to a low-carbon economy, with the intent of taking into account national socio-economic conditions, development aspirations, infrastructure stocks, resource endowments, and other relevant factors. The interim 2014 report focuses on technically feasible pathways to deep decarbonization

  10. 33 CFR 385.38 - Interim goals.

    Science.gov (United States)

    2010-07-01

    ..., monitoring and assessment; (ii) Be provided to the independent scientific review panel established in.... The interim goals shall be developed through the use of appropriate models and tools and shall provide... to be required to meet long-term hydrological and ecological restoration goals, based on best...

  11. Interim guidelines for protecting fire-fighting personnel from multiple hazards at nuclear plant sites

    International Nuclear Information System (INIS)

    Klein, A.R.; Bloom, C.W.

    1989-07-01

    This report provides interim guidelines for reducing the impact to fire fighting and other supporting emergency response personnel from the multiple hazards of radiation, heat stress, and trauma when fighting a fire in a United States commercial nuclear power plant. Interim guidelines are provided for fire brigade composition, training, equipment, procedures, strategies, heat stress and trauma. In addition, task definitions are provided to evaluate and further enhance the interim guidelines over the long term. 19 refs

  12. Interim format and content for a physical security plan for nuclear power plants

    International Nuclear Information System (INIS)

    1977-02-01

    The document serves as interim guidance to assist the licensee or applicant in the preparation of a physical security plan. It is to be used in conjunction with interim acceptance criteria for physical security programs, which will be distributed at a later date

  13. ASPECTS CONCERNING INTERIM FINANCIAL REPORTING IN ROMANIA: STANDARDS AND REGULATIONS

    Directory of Open Access Journals (Sweden)

    Aristita Rotila

    2014-12-01

    Full Text Available The mechanisms employed for the communication of accounting information that is necessary for users in their economic decision-making process consist of the financial statements of an entity. All legal entities, no matter the domain of their activity, have the obligation to draw up annual financial statements for every completed financial year. For certain categories of entities, reporting obligations are also required for periods other than the annual reporting, throughout the financial year. It is the case of interim financial reporting. At the level of the international accounting framework, the aspects related to interim financial reporting are the subject of a separate standard, namely, IAS 34 Interim Financial Reporting. In Romania, the current system of accounting regulations concerning the annual financial statements comprises accounting regulations that comply with the European directives and which apply to the various categories of entities, on the one hand and, on the other, accounting regulations in line with the IFRS, which are applicable to other classes of entities from certain activity sectors. The accounting regulations that apply to each category refer to, among other things, the contents and the format of financial statements that have to be presented. Analysing the system of norms and regulations, this article identifies the requirements concerning interim financial reporting in Romania, with reference to the different types of entities.

  14. IRIS Toxicological Review of Methanol (Noncancer) (Interagency Science Discussion Draft)

    Science.gov (United States)

    On May 3, 2013, the Toxicological Review of Methanol (noncancer) (Revised External Review Draft) was posted for public review and comment. Subsequently, the draft Toxicological Review, Appendices, and draft IRIS Summary were reviewed internally by EPA and by other federal agenci...

  15. Taking interim actions: Integrating CERCLA and NEPA to move ahead with site cleanup

    International Nuclear Information System (INIS)

    MacDonell, M.M.; Peterson, J.M.; Valett, G.L.; McCracken, S.H.

    1991-01-01

    The cleanup of contaminated sites can be expedited by using interim response actions in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended, and the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). In fact, a major portion of some Superfund sites can be cleaned up using interim actions. For CERCLA sites being remediated by the US Department of Energy (DOE), such actions must also comply with the National Environmental Policy Act (NEPA) because the DOE has established a policy for integrating CERCLA and NEPA requirements. A strategy for the integrated documentation with implementation of interim actions has been applied successfully at the Weldon Spring site, and major cleanup projects are currently underway. This paper discusses some of the issues associated with integrating CERCLA and NEPA for interim actions and summarizes those actions that have been identified for the Weldon Spring site

  16. Taking interim actions: Integrating CERCLA and NEPA to move ahead with site cleanup

    International Nuclear Information System (INIS)

    MacDonell, M.M.; Peterson, J.M.; Valett, G.L.; McCracken, S.H.

    1991-01-01

    The cleanup of contaminated sites can be expedited by using interim response actions in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended, and the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). In fact, a major portion of some Superfund sites can be cleaned up using interim actions. For CERCLA sites being remediated by the US Department of Energy (DOE), such actions must also comply with the National Environmental Policy Act (NEPA) because the DOE has established a policy for integrating CERCLA and NEPA requirements. A strategy for the integrated documentation and implementation of interim actions has been applied successfully at the Weldon Spring site, and major cleanup projects are currently underway. This paper discusses some of the issues associated with integrating CERCLA and NEPA for interim actions and summarizes those actions that have been identified for the Weldon Spring site

  17. India's draft nuclear doctrine

    International Nuclear Information System (INIS)

    Kapur, A.

    2000-01-01

    India's draft nuclear doctrine and its nuclear and missile testing are a response to recent international, regional and domestic developments. Nehru's policy of nuclear disarmament, non-discriminatory international arrangements and unilateral restraint has been overturned in favour of self-reliant security and negotiated nuclear restraints. The draft nuclear doctrine is aimed at transparency and formalization of existing capacities. It is anchored in the United Nations Charter, based on the legitimacy of self-defence and espouses minimum nuclear deterrence. After the launching of Pokhran II, the debate in India has been settled on weaponization and deployment. The doctrine is not country-specific with respect to threat perceptions, but the author posits that the long-term focus is on China and the short-term on Pakistan. The doctrine emphasizes civilian command and control. India's decision to test incurred diplomatic and other economic costs, but afforded new opportunities for the country to assert itself militarily and politically in Asia and in the world. There were no diplomatic costs in issuing the draft nuclear doctrine, but the author estimates the economic costs of a full-blown (triad) Indian nuclear deterrent. (author)

  18. Proposed plan for interim remedial measures at the 100-HR-1 Operable Unit, Hanford Site, Richland, Washington. Draft A

    International Nuclear Information System (INIS)

    1994-09-01

    This proposed plan introduces the interim remedial measures for addressing contaminated soil at the 100-HR-1 Operable Unit, located at the Hanford Site. In addition, this plan includes a summary of other alternatives analyzed and considered for the 100-HR-1 Operable Unit. The EPA, DOE, and Washington State Dept. of Ecology believe that a combination of removal, treatment, and disposal technologies, where appropriate, would significantly reduce the potential threats to human health and the environment at the 100-HR-1 Operable Unit high-priority waste sites. The remedial actions described in this proposed plan are designed to minimize human health and ecological risks and ensure that additional contaminants originating from these waste sites are not transported to the groundwater. The 100-HR-1 Operable Unit contains the retention basin for the H reactor cooling system, process effluent trenches, the Pluto crib which received an estimated 260 gallons of radioactive liquid waste, process effluent pipelines, and solid waste sites used for the burial of decontaminated and decommissioned equipment from other facilities. Potential health threats would be from the isotopes of cesium, cobalt, europium, plutonium, and strontium, and from chromium, arsenic, lead, and chysene

  19. 77 FR 66483 - Public Comment on the Draft Federal Urban Design Element and the Draft Update to the Federal...

    Science.gov (United States)

    2012-11-05

    ... NCPC review required by law. The new Federal Urban Design Element provides policies that will guide the... public comment a draft new Federal Urban Design Element and draft revisions to the Preservation and... Features Element articulates policies that guide federal actions preserving Washington's historic character...

  20. In Brief: Geoengineering draft statement

    Science.gov (United States)

    Showstack, Randy

    2009-04-01

    The American Meteorological Society (AMS) has prepared a draft policy statement on geoengineering the climate system, which the AMS Council is considering for approval. The statement notes, “Geoengineering will not substitute for either aggressive mitigation or proactive adaptation. It could contribute to a comprehensive risk management strategy to slow climate change and alleviate its negative impacts, but the potential for adverse and unintended consequences implies a need for adequate research, appropriate regulation, and transparent consideration.” The statement, if adopted, indicates that AMS recommends enhanced research on the scientific and technological potential for geoengineering the climate system; additional study of the historical, ethical, legal, political, and societal aspects of the geoengineering issues; and the development and analysis of policy options to promote transparency and international cooperation in exploring geoengineering options along with restrictions on reckless efforts to manipulate the climate system. AMS is accepting comments on the draft statement until 23 April. For more information, visit http://ametsoc.org/policy/draftstatements/index.html#draft.

  1. 19 CFR 354.8 - Interim sanctions.

    Science.gov (United States)

    2010-04-01

    ... reconsider imposition of interim sanctions on the basis of new and material evidence or other good cause... Secretary may petition a presiding official to impose such sanctions. (b) The presiding official may impose... person to return material previously provided by the Department and all other materials containing the...

  2. Compilation of interim technical research memoranda. Volume I

    International Nuclear Information System (INIS)

    Shanahan, W.R.

    1984-04-01

    Four interim technical research memoranda are presented that describe the results of numerical simulations designed to investigate the dynamics of energetic plasma beams propagating across magnetic fields

  3. 10 CFR 51.77 - Distribution of draft environmental impact statement.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Distribution of draft environmental impact statement. 51...-Regulations Implementing Section 102(2) Draft Environmental Impact Statements-Production and Utilization Facilities § 51.77 Distribution of draft environmental impact statement. (a) In addition to the distribution...

  4. Debate on the Draft--Helping Students Decide Where They Stand.

    Science.gov (United States)

    Victory, James

    1981-01-01

    Presents four exercises to help secondary school social studies students understand the complex issues of the draft. Students participate in a mock draft lottery, analyze Phil Och's Draft Dodger Rag, examine how individual experiences affect attitudes, and compare writings by Bill Mauldin and Ron Kovic. (KC)

  5. Interim research assessment 2003-2005 - Computer Science

    NARCIS (Netherlands)

    Mouthaan, A.J.; Hartel, Pieter H.

    This report primarily serves as a source of information for the 2007 Interim Research Assessment Committee for Computer Science at the three technical universities in the Netherlands. The report also provides information for others interested in our research activities.

  6. An interim report on the State of Nevada socioeconomic studies

    International Nuclear Information System (INIS)

    1989-06-01

    This Interim Report is a report on work in progress and presents findings from the research to date on the potential consequences of a repository for the citizens of Nevada. The research and findings in the Report have been subjected to rigorous peer review as part of the state's effort to insure independent, objective analysis that meets the highest professional standards. The basic research effort will continue through June 1990 and will enable the state to refine and clarify the findings presented in this Interim Report

  7. 10 CFR 51.73 - Request for comments on draft environmental impact statement.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Request for comments on draft environmental impact...-Regulations Implementing Section 102(2) Environmental Impact Statements § 51.73 Request for comments on draft environmental impact statement. Each draft environmental impact statement and each supplement to a draft...

  8. Plutonium Finishing Plant. Interim plutonium stabilization engineering study

    Energy Technology Data Exchange (ETDEWEB)

    Sevigny, G.J.; Gallucci, R.H.; Garrett, S.M.K.; Geeting, J.G.H.; Goheen, R.S.; Molton, P.M.; Templeton, K.J.; Villegas, A.J. [Pacific Northwest Lab., Richland, WA (United States); Nass, R. [Nuclear Fuel Services, Inc. (United States)

    1995-08-01

    This report provides the results of an engineering study that evaluated the available technologies for stabilizing the plutonium stored at the Plutonium Finishing Plant located at the hanford Site in southeastern Washington. Further processing of the plutonium may be required to prepare the plutonium for interim (<50 years) storage. Specifically this document provides the current plutonium inventory and characterization, the initial screening process, and the process descriptions and flowsheets of the technologies that passed the initial screening. The conclusions and recommendations also are provided. The information contained in this report will be used to assist in the preparation of the environmental impact statement and to help decision makers determine which is the preferred technology to process the plutonium for interim storage.

  9. Plutonium Finishing Plant. Interim plutonium stabilization engineering study

    International Nuclear Information System (INIS)

    Sevigny, G.J.; Gallucci, R.H.; Garrett, S.M.K.; Geeting, J.G.H.; Goheen, R.S.; Molton, P.M.; Templeton, K.J.; Villegas, A.J.; Nass, R.

    1995-08-01

    This report provides the results of an engineering study that evaluated the available technologies for stabilizing the plutonium stored at the Plutonium Finishing Plant located at the hanford Site in southeastern Washington. Further processing of the plutonium may be required to prepare the plutonium for interim (<50 years) storage. Specifically this document provides the current plutonium inventory and characterization, the initial screening process, and the process descriptions and flowsheets of the technologies that passed the initial screening. The conclusions and recommendations also are provided. The information contained in this report will be used to assist in the preparation of the environmental impact statement and to help decision makers determine which is the preferred technology to process the plutonium for interim storage

  10. DATA MINING METHODOLOGY FOR DETERMINING THE OPTIMAL MODEL OF COST PREDICTION IN SHIP INTERIM PRODUCT ASSEMBLY

    Directory of Open Access Journals (Sweden)

    Damir Kolich

    2016-03-01

    Full Text Available In order to accurately predict costs of the thousands of interim products that are assembled in shipyards, it is necessary to use skilled engineers to develop detailed Gantt charts for each interim product separately which takes many hours. It is helpful to develop a prediction tool to estimate the cost of interim products accurately and quickly without the need for skilled engineers. This will drive down shipyard costs and improve competitiveness. Data mining is used extensively for developing prediction models in other industries. Since ships consist of thousands of interim products, it is logical to develop a data mining methodology for a shipyard or any other manufacturing industry where interim products are produced. The methodology involves analysis of existing interim products and data collection. Pre-processing and principal component analysis is done to make the data “user-friendly” for later prediction processing and the development of both accurate and robust models. The support vector machine is demonstrated as the better model when there are a lower number of tuples. However as the number of tuples is increased to over 10000, then the artificial neural network model is recommended.

  11. 46 CFR 169.755 - Draft marks and draft indicating systems.

    Science.gov (United States)

    2010-10-01

    ... Section 169.755 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS SAILING SCHOOL VESSELS Vessel Control, Miscellaneous Systems, and Equipment Markings § 169.755 Draft marks and... projections of the marks onto a vertical plane are of uniform height equal to the vertical spacing between...

  12. 10 CFR 51.72 - Supplement to draft environmental impact statement.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Supplement to draft environmental impact statement. 51.72... Implementing Section 102(2) Environmental Impact Statements § 51.72 Supplement to draft environmental impact statement. (a) The NRC staff will prepare a supplement to a draft environmental impact statement for which a...

  13. 18 CFR 300.20 - Interim acceptance and review of Bonneville Power Administration rates.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Interim acceptance and review of Bonneville Power Administration rates. 300.20 Section 300.20 Conservation of Power and Water... Director of the Office of Energy Market Regulation; or (ii) Deny the Administrator's interim rate request...

  14. Fuel Supply Shutdown Facility Interim Operational Safety Requirements

    International Nuclear Information System (INIS)

    BENECKE, M.W.

    2000-01-01

    The Interim Operational Safety Requirements for the Fuel Supply Shutdown (FSS) Facility define acceptable conditions, safe boundaries, bases thereof, and management of administrative controls to ensure safe operation of the facility

  15. Interim report of the task force on energy policy

    International Nuclear Information System (INIS)

    2001-01-01

    A Task Force was established by the Premier of British Columbia in August 2001 to draft an energy policy framework for the province. Based on best practices worldwide, and keeping in mind the specific energy needs of British Columbia, this framework aims at fostering energy development in British Columbia, in accordance with exemplary environmental practices. This interim report comprises the preliminary findings of the Task Force, and public input is sought before the final report is finalized and presented to government. The energy sector of British Columbia comprises hydroelectric power, oil, gas and coal resources. In addition, green energy and alternative energy technologies are being developed, such as wind, solar, and wave power, and hydrogen fuel cells. Industry and individual consumers are well served by the highly developed transmission and distribution systems for energy. Several strategic directions were identified by the Task Force for inclusion in the energy policy of British Columbia, to meet its full potential. They are: growth to ensure safe, reliable energy and take advantage of economic opportunities; diversification; competitiveness; industry restructuring and expansion; environmental imperative; government leadership; and community and First Nations' involvement. Some changes are also required for the continuing success of the energy sector in British Columbia: a move to fully competitive markets in the electricity system, the development of natural gas storage capacity in the Lower Mainland, additional considerations for coal use, and the development of alternative energy sources. It is expected that private capital and more energy supply will result from a fully competitive energy market, which in turn would lower energy costs. Jobs and income would increase as a result of the growth in the sector. Diversification makes good economic and environmental sense. tabs., figs

  16. Increasing draft capability for retrofit flue gas desulfurization systems

    International Nuclear Information System (INIS)

    Petersen, R.D.; Basel, B.E.; Mosier, R.J.

    1992-01-01

    The retrofit installation of flue gas desulfurization (FGD) systems results in significantly higher draft losses for existing generating stations. Consequently, the means for increasing draft capability must be included in many FGD retrofit projects. Consideration is given to several alternatives for increasing draft capability. Alternatives are developed for new induced draft (ID) fans to replace the existing ID fans and for new booster fans to supplement the existing ID fans. Both centrifugal and axial fans are evaluated, as are different means of fan volume control. Each alternative is evaluated on the basis of technical merit and economics. Presented are the development of fan alternatives and results of the technical and economic evaluations

  17. Subsurface Interim Measures/Interim Remedial Action Plan and Decision Document for the 903 Pad, Mound, and East Trenches Areas (Operable Unit No. 2)

    International Nuclear Information System (INIS)

    1992-01-01

    The Department of Energy (DOE) is pursuing an Interim Measure/Interim Remedial Action (IM/IRA) at the 903 Pad, Mound, and East Trenches Areas (Operable Unit No. 2) at the Rocky Flats Plant (RFP). This MIRA is to be conducted to provide information that will aid in the selection and design of final remedial actions at OU2 that will address removal of suspected free-phase volatile organic compound (VOC) contamination. The Plan involves investigating the removal of residual free-phase VOCs by in situ vacuum-enhanced vapor extraction technology at 3 suspected VOC source areas within OU2. VOC-contaminated vapors extracted from the subsurface would be treated by granular activated carbon (GAC) adsorption and discharged. The Plan also includes water table depression, when applicable at the test sites, to investigate the performance of vapor extraction technology in the saturated zone. The Plan provides for treatment of any contaminated ground water recovered during the IM/IRA at existing RFP treatment facilities. The proposed MVIRA Plan is presented in the document entitled ''Proposed Subsurface Interim Measures/Interim Remedial Action Plan/Environmental Assessment and Decision Document, 903 Pad, Mound, and East Trenches Areas, Operable Unit No. 2, '' dated 20 March 1992. Information concerning the proposed Subsurface IM/IRA was presented during a DOE Quarterly Review meeting held on 07 April 1992 and a public meeting held on 07 May 1992, at the Marriott Hotel in Golden, Colorado. The Responsiveness Summary presents DOE's response to all comments received at the public meeting, as well as those mailed to date to DOE during the public comment period

  18. Used Fuel Logistics: Decades of Experience with transportation and Interim storage solutions

    Energy Technology Data Exchange (ETDEWEB)

    Orban, G.; Shelton, C.

    2015-07-01

    Used fuel inventories are growing worldwide. While some countries have opted for a closed cycle with recycling, numerous countries must expand their interim storage solutions as implementation of permanent repositories is taking more time than foreseen. In both cases transportation capabilities will have to be developed. AREVA TN has an unparalleled expertise with transportation of used fuel. For more than 50 years AREVA TN has safely shipped more than 7,000 used fuel transport casks. The transportation model that was initially developed in the 1970s has been adapted and enhanced over the years to meet more restrictive regulatory requirements and evolving customer needs, and to address public concerns. The numerous “lessons learned” have offered data and guidance that have allowed for also efficient and consistent improvement over the decades. AREVA TN has also an extensive experience with interim dry storage solutions in many countries on-site but also is working with partners to developed consolidated interim storage facility. Both expertise with storage and transportation contribute to safe, secure and smooth continuity of the operations. This paper will describe decades of experience with a very successful transportation program as well as interim storage solutions. (Author)

  19. On-site interim storage of spent nuclear fuel: Emerging public issues

    International Nuclear Information System (INIS)

    Feldman, D.L.; Tennessee Univ., Knoxville, TN

    1992-01-01

    Failure to consummate plans for a permanent repository or above- ground interim Monitored Retrievable Storage (MRS) facility for spent nuclear fuel has spurred innovative efforts to ensure at-reactor storage in an environmentally safe and secure manner. This article examines the institutional and socioeconomic impacts of Dry Cask Storage Technology (DCST)-an approach to spent fuel management that is emerging as the preferred method of on-site interim spent fuel storage by utilities that exhaust existing storage capacity

  20. CFD based draft tube hydraulic design optimization

    International Nuclear Information System (INIS)

    McNabb, J; Murry, N; Mullins, B F; Devals, C; Kyriacou, S A

    2014-01-01

    The draft tube design of a hydraulic turbine, particularly in low to medium head applications, plays an important role in determining the efficiency and power characteristics of the overall machine, since an important proportion of the available energy, being in kinetic form leaving the runner, needs to be recovered by the draft tube into static head. For large units, these efficiency and power characteristics can equate to large sums of money when considering the anticipated selling price of the energy produced over the machine's life-cycle. This same draft tube design is also a key factor in determining the overall civil costs of the powerhouse, primarily in excavation and concreting, which can amount to similar orders of magnitude as the price of the energy produced. Therefore, there is a need to find the optimum compromise between these two conflicting requirements. In this paper, an elaborate approach is described for dealing with this optimization problem. First, the draft tube's detailed geometry is defined as a function of a comprehensive set of design parameters (about 20 of which a subset is allowed to vary during the optimization process) and are then used in a non-uniform rational B-spline based geometric modeller to fully define the wetted surfaces geometry. Since the performance of the draft tube is largely governed by 3D viscous effects, such as boundary layer separation from the walls and swirling flow characteristics, which in turn governs the portion of the available kinetic energy which will be converted into pressure, a full 3D meshing and Navier-Stokes analysis is performed for each design. What makes this even more challenging is the fact that the inlet velocity distribution to the draft tube is governed by the runner at each of the various operating conditions that are of interest for the exploitation of the powerhouse. In order to determine these inlet conditions, a combined steady-state runner and an initial draft tube analysis

  1. CFD based draft tube hydraulic design optimization

    Science.gov (United States)

    McNabb, J.; Devals, C.; Kyriacou, S. A.; Murry, N.; Mullins, B. F.

    2014-03-01

    The draft tube design of a hydraulic turbine, particularly in low to medium head applications, plays an important role in determining the efficiency and power characteristics of the overall machine, since an important proportion of the available energy, being in kinetic form leaving the runner, needs to be recovered by the draft tube into static head. For large units, these efficiency and power characteristics can equate to large sums of money when considering the anticipated selling price of the energy produced over the machine's life-cycle. This same draft tube design is also a key factor in determining the overall civil costs of the powerhouse, primarily in excavation and concreting, which can amount to similar orders of magnitude as the price of the energy produced. Therefore, there is a need to find the optimum compromise between these two conflicting requirements. In this paper, an elaborate approach is described for dealing with this optimization problem. First, the draft tube's detailed geometry is defined as a function of a comprehensive set of design parameters (about 20 of which a subset is allowed to vary during the optimization process) and are then used in a non-uniform rational B-spline based geometric modeller to fully define the wetted surfaces geometry. Since the performance of the draft tube is largely governed by 3D viscous effects, such as boundary layer separation from the walls and swirling flow characteristics, which in turn governs the portion of the available kinetic energy which will be converted into pressure, a full 3D meshing and Navier-Stokes analysis is performed for each design. What makes this even more challenging is the fact that the inlet velocity distribution to the draft tube is governed by the runner at each of the various operating conditions that are of interest for the exploitation of the powerhouse. In order to determine these inlet conditions, a combined steady-state runner and an initial draft tube analysis, using a

  2. Environmental assessment for 881 Hillside (High Priority Sites) interim remedial action

    International Nuclear Information System (INIS)

    1990-01-01

    This Environmental Assessment evaluates the impact of an interim remedial action proposed for the High Priority Sites (881 Hillside Area) at the Rocky Flats Plant (RFP). This interim action is to be conducted to minimize the release of hazardous substances from the 881 Hillside Area that pose a potential long-term threat to public health and the environment. This document integrates current site characterization data and environmental analyses required by the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) or ''Superfund'' process, into an environmental assessment pursuant to the National Environmental Policy Act (NEPA). Characterization of the 881 Hillside Area is continuing. Consequently, a final remedial action has not yet been proposed. Environmental impacts associated with the proposed interim remedial action and reasonable alternatives designed to remove organic and inorganic contaminants, including radionuclides, from alluvial groundwater in the 881 Hillside Area are addressed. 24 refs., 5 figs., 23 tabs

  3. Transitioning aluminum clad spent fuels from wet to interim dry storage

    International Nuclear Information System (INIS)

    Louthan, M.R. Jr.; Iyer, N.C.; Sindelar, R.L.; Peacock, H.B. Jr.

    1994-01-01

    The United States Department of Energy (DOE) currently owns several hundred metric tons of aluminum clad, spent nuclear fuel and target assemblies. The vast majority of these irradiated assemblies are currently stored in water basins that were designed and operated for short term fuel cooling prior to fuel reprocessing. Recent DOE decisions to severely limit the reprocessing option have significantly lengthened the time of storage, thus increasing the tendency for corrosion induced degradation of the fuel cladding and the underlying core material. The portent of continued corrosion, coupled with the age of existing wet storage facilities and the cost of continuing basin operations, including necessary upgrades to meet current facility standards, may force the DOE to transition these wet stored, aluminum clad spent fuels to interim dry storage. The facilities for interim dry storage have not been developed, partially because fuel storage requirements and specifications for acceptable fuel forms are lacking. In spite of the lack of both facilities and specifications, current plans are to dry store fuels for approximately 40 to 60 years or until firm decisions are developed for final fuel disposition. The transition of the aluminum clad fuels from wet to interim dry storage will require a sequence of drying and canning operations which will include selected fuel preparations such as vacuum drying and conditioning of the storage atmosphere. Laboratory experiments and review of the available literature have demonstrated that successful interim dry storage may also require the use of fuel and canister cleaning or rinsing techniques that preclude, or at least minimize, the potential for the accumulation of chloride and other potentially deleterious ions in the dry storage environment. This paper summarizes an evaluation of the impact of fuel transitioning techniques on the potential for corrosion induced degradation of fuel forms during interim dry storage

  4. A study of swirl flow in draft tubes

    Energy Technology Data Exchange (ETDEWEB)

    Dahlhaug, Ole Gunnar

    1997-12-31

    This thesis presents measurements performed inside conical diffuser and bend, draft tubes of model hydro turbines, and draft tube of a prototype hydro turbine. Experimental results for swirling flow in conical diffuser and bend are presented in three different geometries. The axial velocity decreases at the centre of the tube at high swirl numbers because of an axial pressure gradient set up by the downstream frictional damping of the tangential velocities and the pressure increase downstream of the diffuser. Analytical models of the tangential velocity profiles are found and the radial pressure distribution calculated. Good correlation to the measured pressure distribution was achieved. Diffuser efficiency was calculated based on the equations for velocity and pressure profiles, which gave a qualified estimate of the diffuser hydraulic performance. The calculation shows that the bend reduces the efficiency by more than 30%. For a straight tube followed by a diffuser, numerical calculations were done, using K{epsilon}, RNG and RSM turbulence models for all measured swirl numbers. The K{epsilon} model gave best results for the forced vortex profile at low swirl numbers, while the RSM model gave best results at high swirl number. The turbulent kinetic energy at high swirl numbers gave the largest difference between the calculated and the measured values. Measurements on draft tubes in model turbines show the importance of good draft tube design. Prototype measurements on a Francis turbine show how the outlet draft tube flow should be measured for prototype draft tube evaluation. 54 refs., 118 figs., 2 tabs.

  5. A study of swirl flow in draft tubes

    Energy Technology Data Exchange (ETDEWEB)

    Dahlhaug, Ole Gunnar

    1998-12-31

    This thesis presents measurements performed inside conical diffuser and bend, draft tubes of model hydro turbines, and draft tube of a prototype hydro turbine. Experimental results for swirling flow in conical diffuser and bend are presented in three different geometries. The axial velocity decreases at the centre of the tube at high swirl numbers because of an axial pressure gradient set up by the downstream frictional damping of the tangential velocities and the pressure increase downstream of the diffuser. Analytical models of the tangential velocity profiles are found and the radial pressure distribution calculated. Good correlation to the measured pressure distribution was achieved. Diffuser efficiency was calculated based on the equations for velocity and pressure profiles, which gave a qualified estimate of the diffuser hydraulic performance. The calculation shows that the bend reduces the efficiency by more than 30%. For a straight tube followed by a diffuser, numerical calculations were done, using K{epsilon}, RNG and RSM turbulence models for all measured swirl numbers. The K{epsilon} model gave best results for the forced vortex profile at low swirl numbers, while the RSM model gave best results at high swirl number. The turbulent kinetic energy at high swirl numbers gave the largest difference between the calculated and the measured values. Measurements on draft tubes in model turbines show the importance of good draft tube design. Prototype measurements on a Francis turbine show how the outlet draft tube flow should be measured for prototype draft tube evaluation. 54 refs., 118 figs., 2 tabs.

  6. Administrative Court Stade, decision of March 22, 1985 (interim storage facility at Gorleben)

    International Nuclear Information System (INIS)

    Anon.

    1985-01-01

    This decision deals with the planned interim storage facility of Gorleben (F.R.G.). The provisions introduced by the 4th ammendment to sec. 5 para. 6 and 9a to 9c of the German Atomic Energy Act might contain a definite regulation of the 'Entsorgung' of nuclear power stations. Sec. 6 of the Atomic Energy Act is not applicable to interim storage facilities because irradiated nuclear fuel has a double nature: It is spent fuel and nuclear waste as well. Considering current licensing procedures of construction and operation of nuclear installations in the field of 'Entsorgung', special legal regulations for the construction and operation of an interim storage facility have to be required. (CW)

  7. Interim storage study report

    Energy Technology Data Exchange (ETDEWEB)

    Rawlins, J.K.

    1998-02-01

    High-level radioactive waste (HLW) stored at the Idaho Chemical Processing Plant (ICPP) in the form of calcine and liquid and liquid sodium-bearing waste (SBW) will be processed to provide a stable waste form and prepare the waste to be transported to a permanent repository. Because a permanent repository will not be available when the waste is processed, the waste must be stored at ICPP in an Interim Storage Facility (ISF). This report documents consideration of an ISF for each of the waste processing options under consideration.

  8. 78 FR 26616 - Draft NOAA Five Year Research and Development Plan

    Science.gov (United States)

    2013-05-07

    ... DEPARTMENT OF COMMERCE Draft NOAA Five Year Research and Development Plan AGENCY: National Oceanic and Atmospheric Administration (NOAA), Department of Commerce (DOC). ACTION: Draft NOAA Five Year Research and Development Plan for Public Review. SUMMARY: NOAA's draft Five Year Research and Development...

  9. Numerical simulation of draft tube flow of a bulb turbine

    Energy Technology Data Exchange (ETDEWEB)

    Coelho, J.G. [Federal University of Triangulo Mineiro, Institute of Technological and Exact Sciences, Avenida Doutor Randolfo Borges Junior, 1250 – Uberaba – MG (Brazil); Brasil, A.C.P. Jr. [University of Brasilia, Department of Mechanical Engineering, Campus Darcy Ribeiro, Brasilia – DF (Brazil)

    2013-07-01

    In this work a numerical study of draft tube of a bulb hydraulic turbine is presented, where a new geometry is proposed. This new proposal of draft tube has the unaffected ratio area, a great reduction in his length and approximately the same efficiency of the draft tube conventionally used. The numerical simulations were obtained in commercial software of calculation of flow (CFX-14), using the turbulence model SST, that allows a description of the field fluid dynamic near to the wall. The simulation strategy has an intention of identifying the stall of the boundary layer precisely limits near to the wall and recirculations in the central part, once those are the great causes of the decrease of efficiency of a draft tube. Finally, it is obtained qualitative and quantitative results about the flow in draft tubes.

  10. Draft of regulations for road transport of radioactive wastes

    International Nuclear Information System (INIS)

    Gese, J.; Zizka, B.

    1979-06-01

    A draft regulation is presented for the transport of solid and solidified radioactive wastes from nuclear power plants. The draft takes into consideration dosimetric, safety and fire-fighting directives, transport organization, anticipated amounts of radioactive wastes, characteristics of containers, maintenance of vehicles, and equipment of vehicles and personnel. The draft is based on the provisional regulations governing the transport on public roads issued in 1973, valid directives, decrees, acts and standards, and complies with 1973 IAEA requirements. (J.P.)

  11. Analysis of the Kaplan turbine draft tube effect

    International Nuclear Information System (INIS)

    Motycak, L; Skotak, A; Obrovsky, J

    2010-01-01

    The aim of this paper is to present information about possible problems and errors which can appear during numerical analyses of low head Kaplan turbines with a view to the runner - draft tube interaction. The setting of numerical model, grid size, used boundary conditions are the interface definition between runner and draft tube are discussed. There are available data from physical model tests which gives a great opportunity to compare CFD and experiment results and on the basis of this comparison to determine the approach to the CFD flow modeling. The main purpose for the Kaplan turbine model measurement was to gather the information about real flow field. The model tests were carried out in new hydraulic laboratory of CKD Blansko Engineering. The model tests were focused on the detailed velocity measurements downstream of the runner by differential pressure probe and on the velocity measurement downstream of the draft tube elbow by Particle Image Velocimetry method (PIV). The data from CFD simulation were compared to the velocity measurement results. In the paper also the design of the original draft tube modification due to flow improvement is discussed in the case of the Kaplan turbine uprating project. The results of the draft tube modification were confirmed by model tests in the hydraulic laboratory as well.

  12. Analysis of the Kaplan turbine draft tube effect

    Energy Technology Data Exchange (ETDEWEB)

    Motycak, L; Skotak, A; Obrovsky, J, E-mail: motycak.vhs@cbeng.c [CKD Blansko Engineering, a.s., Capkova 2357/5, Blansko 67801 (Czech Republic)

    2010-08-15

    The aim of this paper is to present information about possible problems and errors which can appear during numerical analyses of low head Kaplan turbines with a view to the runner - draft tube interaction. The setting of numerical model, grid size, used boundary conditions are the interface definition between runner and draft tube are discussed. There are available data from physical model tests which gives a great opportunity to compare CFD and experiment results and on the basis of this comparison to determine the approach to the CFD flow modeling. The main purpose for the Kaplan turbine model measurement was to gather the information about real flow field. The model tests were carried out in new hydraulic laboratory of CKD Blansko Engineering. The model tests were focused on the detailed velocity measurements downstream of the runner by differential pressure probe and on the velocity measurement downstream of the draft tube elbow by Particle Image Velocimetry method (PIV). The data from CFD simulation were compared to the velocity measurement results. In the paper also the design of the original draft tube modification due to flow improvement is discussed in the case of the Kaplan turbine uprating project. The results of the draft tube modification were confirmed by model tests in the hydraulic laboratory as well.

  13. Analysis of the Kaplan turbine draft tube effect

    Science.gov (United States)

    Motycak, L.; Skotak, A.; Obrovsky, J.

    2010-08-01

    The aim of this paper is to present information about possible problems and errors which can appear during numerical analyses of low head Kaplan turbines with a view to the runner - draft tube interaction. The setting of numerical model, grid size, used boundary conditions are the interface definition between runner and draft tube are discussed. There are available data from physical model tests which gives a great opportunity to compare CFD and experiment results and on the basis of this comparison to determine the approach to the CFD flow modeling. The main purpose for the Kaplan turbine model measurement was to gather the information about real flow field. The model tests were carried out in new hydraulic laboratory of CKD Blansko Engineering. The model tests were focused on the detailed velocity measurements downstream of the runner by differential pressure probe and on the velocity measurement downstream of the draft tube elbow by Particle Image Velocimetry method (PIV). The data from CFD simulation were compared to the velocity measurement results. In the paper also the design of the original draft tube modification due to flow improvement is discussed in the case of the Kaplan turbine uprating project. The results of the draft tube modification were confirmed by model tests in the hydraulic laboratory as well.

  14. Conceptual design report for immobilized high-level waste interim storage facility (Phase 1)

    International Nuclear Information System (INIS)

    Burgard, K.C.

    1998-01-01

    The Hanford Site Canister Storage Building (CSB Bldg. 212H) will be utilized to interim store Phase 1 HLW products. Project W-464, Immobilized High-Level Waste Interim Storage, will procure an onsite transportation system and retrofit the CSB to accommodate the Phase 1 HLW products. The Conceptual Design Report establishes the Project W-464 technical and cost basis

  15. Conceptual design report for immobilized high-level waste interim storage facility (Phase 1)

    Energy Technology Data Exchange (ETDEWEB)

    Burgard, K.C.

    1998-04-09

    The Hanford Site Canister Storage Building (CSB Bldg. 212H) will be utilized to interim store Phase 1 HLW products. Project W-464, Immobilized High-Level Waste Interim Storage, will procure an onsite transportation system and retrofit the CSB to accommodate the Phase 1 HLW products. The Conceptual Design Report establishes the Project W-464 technical and cost basis.

  16. Agenda 21 interim balance, 1997

    Energy Technology Data Exchange (ETDEWEB)

    Van Vuuren, D.P.; Bakkes, J.A.

    1997-10-01

    Five years after the `United Nations Conference on Environment and Development (UNCED)`, an interim balance was drawn up to see what was done to meet the ambitious challenges adopted in Agenda 21 during this conference. Such a balance is presented in this report and the complementary brochure, `Developments in Sustainability 1992-1997`, reflecting societal developments and changes in environmental quality, as well as changes in responses to environmental concerns. 24 figs., 12 tabs., 68 refs.

  17. 16 CFR 1.84 - Draft environmental impact statements: Availability and comment.

    Science.gov (United States)

    2010-01-01

    ... 16 Commercial Practices 1 2010-01-01 2010-01-01 false Draft environmental impact statements... Environmental Policy Act of 1969 § 1.84 Draft environmental impact statements: Availability and comment. Except for proposals for legislation, environmental impact statements shall be prepared in two stages: Draft...

  18. 10 CFR 51.76 - Draft environmental impact statement-limited work authorization.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Draft environmental impact statement-limited work...-Regulations Implementing Section 102(2) Draft Environmental Impact Statements-Production and Utilization Facilities § 51.76 Draft environmental impact statement—limited work authorization. The NRC will prepare a...

  19. 10 CFR 51.117 - Draft environmental impact statement-notice of availability.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Draft environmental impact statement-notice of... environmental impact statement—notice of availability. (a) Upon completion of a draft environmental impact statement or any supplement to a draft environmental impact statement, the appropriate NRC staff director...

  20. 78 FR 77027 - Overhead Clearance (Air-Draft) Accidents

    Science.gov (United States)

    2013-12-20

    ... No. USCG-2013-0466] Overhead Clearance (Air-Draft) Accidents AGENCY: Coast Guard, DHS. ACTION... clearance (air-draft) accidents. In its petition, which calls for vessel masters to be provided with... accidents that it says were avoidable and that resulted in damage to or destruction of waterway...

  1. 76 FR 9210 - Draft DOC National Aquaculture Policy

    Science.gov (United States)

    2011-02-16

    ... DEPARTMENT OF COMMERCE Draft DOC National Aquaculture Policy AGENCY: Commerce. ACTION: Notice of availability of draft aquaculture policy; request for comments. SUMMARY: The Department of Commerce (DOC) is... United States. The intent of the policy is to guide DOC's actions and decisions on aquaculture and to...

  2. 23 CFR 771.123 - Draft environmental impact statements.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Draft environmental impact statements. 771.123 Section... ENVIRONMENT ENVIRONMENTAL IMPACT AND RELATED PROCEDURES § 771.123 Draft environmental impact statements. (a) A... significant impacts on the environment. When the applicant, after consultation with any project sponsor that...

  3. Introduction to Production/Manufacturing Drafting. Drafting Module 8. Instructor's Guide.

    Science.gov (United States)

    Missouri Univ., Columbia. Instructional Materials Lab.

    This module, 1 of 10 in the Drafting curriculum guide developed in Missouri, contains 3 units of study that include some or all of the following components: performance objectives, lesson plans, information sheets, transparency masters, handouts, assignment sheets, job sheets, a unit test, and answers to the unit test. Special instructions on…

  4. THE IMPORTANCE OF FINANCIAL INTERIM REPORTING FOR THE POSITION OF COMPANIES

    Directory of Open Access Journals (Sweden)

    Claudia‐Elena\tGRIGORAȘ‐ICHIM

    2015-12-01

    Full Text Available The importance that each company must grant to the strategic sources of information generates our concern for analysis of the interim financial reporting. In every enterprise, there are doubts on the usefulness of interim financial reports, given the following elements: the necessary time for their preparation (relatively long, their restricted character and the resources necessary to establish them. Finding a common solution to these problems and, implicitly, increasing the interest for interim financial reporting, can help to increase the economic performance of the company, either by reducing the unnecessary costs related to time, or by increasing communication and transparency with third parties. An appropriate management can act early in the direction of counteracting the negative effects in their company or prevention of any commercial or production failures, the overall economic trends in that field and increasing productivity. Starting from these premises, we propose a research in order to capture the main aspects related to the mentioned issues.

  5. Long-term interim storage concepts with conditioning strategies ensuring compatibility with subsequent disposal or reprocessing

    International Nuclear Information System (INIS)

    Moitrier, C.; Tirel, I.; Villard, C.

    2000-01-01

    The objective of the CEA studies carried out under research topic 3 (long-term interim storage) of the 1991 French radioactive waste management law is to demonstrate the industrial feasibility of a comprehensive, flexible interim storage facility by thoroughly evaluating and comparing all the basic components of various interim storage concepts. In this context, the CEA is considering reference solutions or concepts based on three primary components (the package, the interim storage facility and the site) suitable for determining the specifications of a very long-term solution. Some aspects are examined in greater detail, such as the implementation of long-term technologies, conditioning processes ensuring the absence of water and contamination in the facility, or allowance for radioactive decay of the packages. The results obtained are continually compiled in reports substantiating the design options. These studies should also lead to an overall economic assessment in terms of the capital and operating cost requirements, thereby providing an additional basis for selecting the design options. The comparison with existing industrial facilities highlights the technical and economic progress represented by the new generation of interim storage units. (authors)

  6. Reduced order model of draft tube flow

    International Nuclear Information System (INIS)

    Rudolf, P; Štefan, D

    2014-01-01

    Swirling flow with compact coherent structures is very good candidate for proper orthogonal decomposition (POD), i.e. for decomposition into eigenmodes, which are the cornerstones of the flow field. Present paper focuses on POD of steady flows, which correspond to different operating points of Francis turbine draft tube flow. Set of eigenmodes is built using a limited number of snapshots from computational simulations. Resulting reduced order model (ROM) describes whole operating range of the draft tube. ROM enables to interpolate in between the operating points exploiting the knowledge about significance of particular eigenmodes and thus reconstruct the velocity field in any operating point within the given range. Practical example, which employs axisymmetric simulations of the draft tube flow, illustrates accuracy of ROM in regions without vortex breakdown together with need for higher resolution of the snapshot database close to location of sudden flow changes (e.g. vortex breakdown). ROM based on POD interpolation is very suitable tool for insight into flow physics of the draft tube flows (especially energy transfers in between different operating points), for supply of data for subsequent stability analysis or as an initialization database for advanced flow simulations

  7. Considerations about noise aspects in the EEC draft directive physical agents

    NARCIS (Netherlands)

    Passchier-Vermeer, W.

    1992-01-01

    This report contains an overview of and considerations about the Working Draft of a future EEC Directive Physical Agents (draft 1991). The overview in this report is limited to noise exposure. The Draft gives minimum regulations concerning the protection of workers and prevention against the risks

  8. Application of dose evaluation of the MCNP code for interim spent fuel cask storage facility

    International Nuclear Information System (INIS)

    Kosako, Toshiso; Iimoto, Takeshi; Ishikawa, Satoshi; Tsuboi, Takafumi; Teramura, Masahiro; Okamura, Tomomi; Narumiya, Yoshiyuki

    2007-01-01

    The interim storage facility for spent fuel metallic cask is designed as a concrete building structure with air inlet and outlet for circulating the natural cooling. The feature of the interim storage facility is big capacity of spent fuel at several thousands MTU and restricted site usage. It is important to evaluate realistic dose rate in shielding design of the interim storage facility, therefore the three-dimensional continuous-energy Monte Carlo radiation transport code MCNP that exactly treating the complicated geometry was applied. The validation of dose evaluation for interim storage facility by MCNP code were performed by three kinds of neutron shielding benchmark experiments; cask shadow shielding experiment, duct streaming experiment and concrete deep penetration experiment. Dose rate distributions at each benchmark were measured and compared with the calculated results. The comparison showed a good consistency between calculation and experiment results. (author)

  9. Interim data report for the safety assessment SR-Can

    International Nuclear Information System (INIS)

    Vahlund, Fredrik; Andersson, Johan

    2004-08-01

    This document is the interim data report in the project SR-Can. The purpose of the data report is to present input data, with uncertainty estimates, for the SR-Can assessment calculations. Besides input data, the report also describes the standardised procedures used when deriving the input data and the corresponding uncertainty estimates. However, in the present interim version of the report (written in the initial stage of the project when site characterisation has yet not been completed) the standardised procedures have not been possible to apply for most of the data and, in order to present a compilation of the data used in the assessment, much of the input data is presented without following the standardised procedures. This will however be changed for the final version of the SR-Can data report, in order to show the methodology that will be used in the final version one example of how input data will be presented is included (migration data for buffer) . The recommended input data for the assessment calculations are, for the interim version, mainly based on SR 97 Beberg data, these are merely presented without any background or uncertainty discussion (this is presented in the SR 97 data report)

  10. Interim Storage Facility decommissioning. Final report

    International Nuclear Information System (INIS)

    Johnson, R.P.; Speed, D.L.

    1985-01-01

    Decontamination and decommissioning of the Interim Storage Facility were completed. Activities included performing a detailed radiation survey of the facility, removing surface and imbedded contamination, excavating and removing the fuel storage cells, restoring the site to natural conditions, and shipping waste to Hanford, Washington, for burial. The project was accomplished on schedule and 30% under budget with no measurable exposure to decommissioning personnel

  11. Single-shell tank interim stabilization project plan

    Energy Technology Data Exchange (ETDEWEB)

    Ross, W.E.

    1998-05-11

    This project plan establishes the management framework for conduct of the TWRS Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organizational structure, roles, responsibilities, and interfaces; and operational methods. This plan serves as the project executional baseline.

  12. 14 CFR 136.41 - Interim operating authority.

    Science.gov (United States)

    2010-01-01

    ... AND NATIONAL PARKS AIR TOUR MANAGEMENT National Parks Air Tour Management § 136.41 Interim operating... terminate 180 days after the date on which an air tour management plan is established for the park and tribal lands; (6) Shall promote protection of national park resources, visitor experiences, and tribal...

  13. Alternatives for managing wastes from reactors and post-fission operations in the LWR fuel cycle. Volume 3. Alternatives for interim storage and transportation

    International Nuclear Information System (INIS)

    1976-05-01

    Volume III of the five-volume report contains information on alternatives for interim storage and transportation. Section titles are: interim storage of spent fuel elements; interim storage of chop-leach fuel bundle residues; tank storage of high-level liquid waste; interim storage of solid non-high-level wastes; interim storage of solidified high-level waste; and, transportation alternatives

  14. PROJECT W-551 INTERIM PRETREATMENT SYSTEM TECHNOLOGY SELECTION SUMMARY DECISION REPORT AND RECOMMENDATION

    International Nuclear Information System (INIS)

    CONRAD EA

    2008-01-01

    This report provides the conclusions of the tank farm interim pretreatment technology decision process. It documents the methodology, data, and results of the selection of cross-flow filtration and ion exchange technologies for implementation in project W-551, Interim Pretreatment System. This selection resulted from the evaluation of specific scope criteria using quantitative and qualitative analyses, group workshops, and technical expert personnel

  15. 78 FR 66010 - Draft Risk Profile on Pathogens and Filth in Spices; Availability

    Science.gov (United States)

    2013-11-04

    ...] Draft Risk Profile on Pathogens and Filth in Spices; Availability AGENCY: Food and Drug Administration... availability of a draft risk profile entitled ``FDA Draft Risk Profile: Pathogens and Filth in Spices'' (draft... posed by consumption of spices in the United States by identifying the most commonly occurring microbial...

  16. Draft 1988 mission plan amendment

    International Nuclear Information System (INIS)

    1988-06-01

    This draft 1988 amendment to the Mission Plan for the Civilian Radioactive Waste Management Program has been prepared by the US Department of Energy (DOE). The purpose is to inform the Congress of the DOE's plans for implementing the provisions of the Nuclear Waste Policy Amendments Act of 1987 (P.L. 100-203) for the Civilian Radioactive Waste Management Program. This document is being submitted in draft form to Federal agencies, states, previously affected Indian Tribes, affected units of local government, and the public. After the consideration of comments, this amendment will be revised as appropriate and submitted to the Congress. 39 refs., 7 figs., 4 tabs

  17. Rosiglitazone evaluated for cardiovascular outcomes--an interim analysis

    DEFF Research Database (Denmark)

    Home, Philip D; Pocock, Stuart J; Beck-Nielsen, Henning

    2007-01-01

    BACKGROUND: A recent meta-analysis raised concern regarding an increased risk of myocardial infarction and death from cardiovascular causes associated with rosiglitazone treatment of type 2 diabetes. METHODS: We conducted an unplanned interim analysis of a randomized, multicenter, open...... group). The primary end point was hospitalization or death from cardiovascular causes. RESULTS: Because the mean follow-up was only 3.75 years, our interim analysis had limited statistical power to detect treatment differences. A total of 217 patients in the rosiglitazone group and 202 patients...... in the control group had the adjudicated primary end point (hazard ratio, 1.08; 95% confidence interval [CI], 0.89 to 1.31). After the inclusion of end points pending adjudication, the hazard ratio was 1.11 (95% CI, 0.93 to 1.32). There were no statistically significant differences between the rosiglitazone...

  18. Poor predictive value of positive interim FDG-PET/CT in primary mediastinal large B-cell lymphoma

    Energy Technology Data Exchange (ETDEWEB)

    Lazarovici, Julien; Petrovanu, Cynthia; Danu, Alina; Ferme, Christophe; Ribrag, Vincent; Ghez, David [Gustave Roussy, Villejuif (France). Dept. of Hematology; Paris Saclay Univ., Saint-Aubin (France); Terroir, Marie [Gustave Roussy, Villejuif (France). Dept. of Nuclear Medicine and Endocrine Oncology; Paris Saclay Univ., Saint-Aubin (France); Arfi-Rouche, Julia [Gustave Roussy, Villejuif (France). Dept. of Radiology; Paris Saclay Univ., Saint-Aubin (France); Michot, Jean-Marie [Gustave Roussy, Villejuif (France). Dept. of Drug Development (DITEP); Paris Saclay Univ., Saint-Aubin (France); Mussot, Sacha; Florea, Valentina [Marie Lannelongue Hospital, Le Plessis Robinson (France). Dept. of Thoracic Surgery; Ghigna, Maria-Rosa [Marie Lannelongue Hospital, Le Plessis Robinson (France). Dept. of Pathology; Dartigues, Peggy [Gustave Roussy, Villejuif (France). Dept. of Pathology; Paris Saclay Univ., Saint-Aubin (France)

    2017-11-15

    Though commonly used to assess response to therapy, the prognostic value of interim FDG-PET/CT in Primary Mediastinal Large B-cell Lymphoma (PMBCL) is unclear. We conducted a retrospective study on 36 consecutive patients treated at our institution for a PMBCL between 2006 and 2014. All patients with a positive interim FDG-PET/CT had undergone histological restaging consisting either in a surgical debulking of the residual lesion (15 patients) or a CT-guided core needle biopsy (two patients). All FDG-PET/CT were secondarily reviewed according to the more recent Deauville criteria. Interim FDG-PET/CT was considered positive in 17/36 patients using visual evaluation. Among these patients, 14 had a Deauville score of 4. Histological restaging was negative in all but one case, showing inflammation and/or fibrosis. After a median follow-up of 48.5 months, a total of five patients have relapsed, two patients in the positive FDG-PET/CT group, and three patients in the negative FDG-PET/CT group, respectively. These data indicate that a positive interim FDG-PET/CT does not reflect persistence of active disease in the vast majority of PMBCL cases. The relapse rate appears similar regardless of interim FDG-PET/CT results and interpretation criteria. This suggests that interim FDG-PET/CT has a poor positive predictive value, thus kt should be used with caution in PMBCL. (orig.)

  19. 75 FR 13484 - Foreign-Trade Zone 22; Temporary/Interim Manufacturing Authority; LG Electronics Mobilecomm USA...

    Science.gov (United States)

    2010-03-22

    ... DEPARTMENT OF COMMERCE [Docket T-1-2010] Foreign-Trade Zones Board Foreign-Trade Zone 22; Temporary/Interim Manufacturing Authority; LG Electronics Mobilecomm USA, Inc. (Cell Phones); Notice of.../ interim manufacturing (T/IM) authority, on behalf of LG Electronics Mobilecomm USA, Inc. (LGEMU), to...

  20. Interim Action Proposed Plan for the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit; FINAL

    International Nuclear Information System (INIS)

    Bradley, J.

    2002-01-01

    The purpose of this Interim Action Proposed Plan (IAPP) is to describe the preferred interim remedial action for addressing the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit and to provide an opportunity for public input into the remedial action selection process

  1. Automotive Mechanics Occupational Performance Survey. Interim Report.

    Science.gov (United States)

    Borcher, Sidney D.; Leiter, Paul B.

    The purpose of this federally-funded interim report is to present the results of a task inventory analysis survey of automotive mechanics completed by project staff within the Instructional Systems Design Program at the Center for Vocational and Technical Education. Intended for use in curriculum development for vocational education programs in…

  2. 340 waste handling facility interim safety basis

    Energy Technology Data Exchange (ETDEWEB)

    VAIL, T.S.

    1999-04-01

    This document presents an interim safety basis for the 340 Waste Handling Facility classifying the 340 Facility as a Hazard Category 3 facility. The hazard analysis quantifies the operating safety envelop for this facility and demonstrates that the facility can be operated without a significant threat to onsite or offsite people.

  3. 340 waste handling facility interim safety basis

    International Nuclear Information System (INIS)

    VAIL, T.S.

    1999-01-01

    This document presents an interim safety basis for the 340 Waste Handling Facility classifying the 340 Facility as a Hazard Category 3 facility. The hazard analysis quantifies the operating safety envelop for this facility and demonstrates that the facility can be operated without a significant threat to onsite or offsite people

  4. On random pressure pulses in the turbine draft tube

    Science.gov (United States)

    Kuibin, P. A.; Shtork, S. I.; Skripkin, S. G.; Tsoy, M. A.

    2017-04-01

    The flow in the conical part of the hydroturbine draft tube undergoes various instabilities due to deceleration and flow swirling at off-design operation points. In particular, the precessing vortex rope develops at part-load regimes in the draft tube. This rope induces periodical low-frequency pressure oscillations in the draft tube. Interaction of rotational (asynchronous) mode of disturbances with the elbow can bring to strong oscillations in the whole hydrodynamical system. Recent researches on flow structure in the discharge cone in a regime of free runner had revealed that helical-like vortex rope can be unstable itself. Some coils of helix close to each other and reconnection appears with generation of a vortex ring. The vortex ring moves toward the draft tube wall and downstream. The present research is focused on interaction of vortex ring with wall and generation of pressure pulses.

  5. Surface Water Interim Measures/Interim Remedial Action Plan/Environmental Assessment and Decision Document for South Walnut Creek Basin (Operable Unit No. 2)

    International Nuclear Information System (INIS)

    1991-01-01

    The Department of Energy (DOE) is pursuing an Interim Measure/Interim Remedial Action (IM/IRA) at the 903 Pad, Mound, and East Trenches Areas (Operable Unit No. 2) at the Rocky Flats Plant (RFP). This IM/IRA is to be conducted to minimize the release from these areas of hazardous substances that pose a potential threat to the public health and environment. The Plan involved the collection of contaminated surface water at specific locations, treatment by chemical precipitation, cross-flow membrane filtration and granular activated carbon (GAC) adsorption, and surface discharge of treated water. Information for the initial configuration of the Plan is presented in the document entitled ''Proposed Interim Measures/Interim Remedial Action Plan and Decision Document, 903 Pad, Mound, and East Trenches Areas, Operable Unit No. 2'' (IM/IRAP) dated 26 September 1990. Information concerning the proposed Surface Water IM/IRA was presented during a public meeting held from 7 to 10 p.m., Tuesday, 23 October 1990, at the Westminster City Park Recreation Center in Westminster, Colorado. This Responsiveness Summary presents DOE's response to all comments received at the public meeting, as well as those mailed to DOE during the public comment period which ended 24 November 1990. There were a number of technical comments on the plan that DOE has addressed herein. It is noted that several major issues were raised by the comments. Regardless of the estimated low risk to the public from construction and water transport activities, the popular sentiment of the public, based on comments received, is strong concern over worker and public health risks from these activities. In the light of public and municipal concerns, DOE proposes to eliminate from this IM/IRA the interbasin transfer of Woman Creek seepage to the South Walnut Creek drainage and to address collection and treatment of contaminated South Walnut Creek and Woman Creek surface water under two separate IM/IRAs

  6. Finding of no significant impact. Consolidation and interim storage of special nuclear material at Rocky Flats Environmental Technology Site

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    The Department of Energy (DOE) has prepared an environmental assessment (EA), DOE/EA -- 1060, for the consolidation, processing, and interim storage of Category I and II special nuclear material (SNM) in Building 371 at the Rocky Flats Environmental Technology Site (hereinafter referred to as Rocky Flats or Site), Golden, Colorado. The scope of the EA included alternatives for interim storage including the no action alternative, the construction of a new facility for interim storage at Rocky Flats, and shipment to other DOE facilities for interim storage.

  7. Finding of no significant impact. Consolidation and interim storage of special nuclear material at Rocky Flats Environmental Technology Site

    International Nuclear Information System (INIS)

    1995-06-01

    The Department of Energy (DOE) has prepared an environmental assessment (EA), DOE/EA -- 1060, for the consolidation, processing, and interim storage of Category I and II special nuclear material (SNM) in Building 371 at the Rocky Flats Environmental Technology Site (hereinafter referred to as Rocky Flats or Site), Golden, Colorado. The scope of the EA included alternatives for interim storage including the no action alternative, the construction of a new facility for interim storage at Rocky Flats, and shipment to other DOE facilities for interim storage

  8. 78 FR 70244 - Electronic Interim Assistance Reimbursement Program

    Science.gov (United States)

    2013-11-25

    ..., Social Security Online, at http://www.socialsecurity.gov . SUPPLEMENTARY INFORMATION: Background To be... SOCIAL SECURITY ADMINISTRATION 20 CFR Part 416 [Docket No. SSA-2011-0104] RIN 0960-AH45 Electronic Interim Assistance Reimbursement Program AGENCY: Social Security Administration. ACTION: Notice of...

  9. Federal Administrative Court confirms interim action for the Kruemmel power plant site

    International Nuclear Information System (INIS)

    Anon.

    1982-01-01

    The interim action concerning the reactor site was confirmed in 1972, the action of voidance because of the possible injuriousness to health was rejected in the first instance. In the appeal OVG Lueneburg had sharpened three clauses concerning the contents of the restrictions and injunctions included in the interim action to the disadvantage of the operator. Responding to a new appeal the BVerwG has eliminated these restrictions and dismissed the following appeals of the plaintiffs. (HP) [de

  10. 77 FR 34935 - Foreign-Trade Zone 161; Temporary/Interim Manufacturing Authority; Siemens Energy, Inc., (Wind...

    Science.gov (United States)

    2012-06-12

    ... DEPARTMENT OF COMMERCE Foreign-Trade Zones Board [Docket T-4-2012] Foreign-Trade Zone 161; Temporary/Interim Manufacturing Authority; Siemens Energy, Inc., (Wind Turbine Nacelles and Hubs); Notice of... temporary/interim manufacturing (T/IM) authority, on behalf of Siemens Energy, Inc., to manufacture wind...

  11. Using ERA-Interim reanalysis for creating datasets of energy-relevant climate variables

    Science.gov (United States)

    Jones, Philip D.; Harpham, Colin; Troccoli, Alberto; Gschwind, Benoit; Ranchin, Thierry; Wald, Lucien; Goodess, Clare M.; Dorling, Stephen

    2017-07-01

    The construction of a bias-adjusted dataset of climate variables at the near surface using ERA-Interim reanalysis is presented. A number of different, variable-dependent, bias-adjustment approaches have been proposed. Here we modify the parameters of different distributions (depending on the variable), adjusting ERA-Interim based on gridded station or direct station observations. The variables are air temperature, dewpoint temperature, precipitation (daily only), solar radiation, wind speed, and relative humidity. These are available on either 3 or 6 h timescales over the period 1979-2016. The resulting bias-adjusted dataset is available through the Climate Data Store (CDS) of the Copernicus Climate Change Data Store (C3S) and can be accessed at present from climate.copernicus.eu" target="_blank">ftp://ecem.climate.copernicus.eu. The benefit of performing bias adjustment is demonstrated by comparing initial and bias-adjusted ERA-Interim data against gridded observational fields.

  12. EPA's Revised Interim Financial Assistance Conflict of Interest Policy

    Science.gov (United States)

    EPA has established the following revised interim policy governing disclosure of actual and potential conflicts of interest (COI Policy) by applicants for, and recipients of, federal financial assistance awards from EPA.

  13. The National Football League Combine: performance differences between drafted and nondrafted players entering the 2004 and 2005 drafts.

    Science.gov (United States)

    Sierer, S Patrick; Battaglini, Claudio L; Mihalik, Jason P; Shields, Edgar W; Tomasini, Nathan T

    2008-01-01

    The purpose of this study was to examine performance differences between drafted and nondrafted athletes (N = 321) during the 2004 and 2005 National Football League (NFL) Combines. We categorized players into one of 3 groups: Skill, Big skill, and Linemen. Skill players (SP) consisted of wide receivers, cornerbacks, free safeties, strong safeties, and running backs. Big skill players (BSP) included fullbacks, linebackers, tight ends, and defensive ends. Linemen (LM) consisted of centers, offensive guards, offensive tackles, and defensive tackles. We analyzed player height and mass, as well as performance on the following combine drills: 40-yard dash, 225-lb bench press test, vertical jump, broad jump, pro-agility shuttle, and the 3-cone drill. Student t-tests compared performance on each of these measures between drafted and nondrafted players. Statistical significance was found between drafted and nondrafted SP for the 40-yard dash (P ready themselves for the NFL Combine.

  14. 39 CFR 211.4 - Interim personnel regulations.

    Science.gov (United States)

    2010-07-01

    ... 39 Postal Service 1 2010-07-01 2010-07-01 false Interim personnel regulations. 211.4 Section 211.4... under the Postal Reorganization Act. (b) Continuation of Personnel Provisions of Former title 39, U.S.C... collective bargaining agreement under the Postal Reorganization Act, all provisions of former title 39, U.S.C...

  15. Dry interim storage of radioactive material in Germany

    International Nuclear Information System (INIS)

    Drobniewski, Christian; Palmes, Julia

    2013-01-01

    In accordance with the waste management concept in Germany, spent fuel is stored in interim storage facilities for a period of up to 40 years until deposition in a geological repository. In twelve on-site interim storages in the vicinity or directly on the sites of the nuclear power plants, spent fuel elements from reactor operation are stored after the necessary period of decay in wet storage basins inside the reactors. Additionally, three central interim storage facilities for storage of spent fuel of different origin are in operation. The German facilities realize the concept of dry interim storage in metallic transport and storage casks. The confinement of the radioactive material is ensured by the double lid system of the casks, of which the leak tightness is monitored constantly. The casks are constructed to provide adequate heat removal and shielding of gamma and neutron radiation. Usually the storage facilities are halls of thick concrete structures, which ensure the removal of the decay heat by natural convection. The main safety goal of the storage concept is to prevent unnecessary exposure of persons, material goods and environment to ionizing radiation. Moreover any exposure should be kept as low as reasonable achievable. To reach this goal the containment of the radioactive materials, the disposal of decay heat, the sub criticality and the shielding of ionizing radiation has to be demonstrated by the applicant and verified by the licensing authority. In particular accidents, incidents and disasters have to be considered in the facility and cask design. This includes mechanical impacts onto the cask, internal and external fire, and environmental effects like wind, rain, snowfall, flood, earthquakes and landslides. In addition civilizatoric influences like plane crashes and explosions have to be taken into account. In all mentioned cases the secure confinement of the radioactive materials has to be ensured. On-site storage facilities have to consider the

  16. A State Articulated Instructional Objectives Guide for Occupational Education Programs. State Pilot Model for Drafting (Graphic Communications). Part I--Basic. Part II--Specialty Programs. Section A (Mechanical Drafting and Design). Section B (Architectural Drafting and Design).

    Science.gov (United States)

    North Carolina State Dept. of Community Colleges, Raleigh.

    A two-part articulation instructional objective guide for drafting (graphic communications) is provided. Part I contains summary information on seven blocks (courses) of instruction. They are as follow: introduction; basic technical drafting; problem solving in graphics; reproduction processes; freehand drawing and sketching; graphics composition;…

  17. Nanomaterial Case Studies: Nanoscale Titanium Dioxide (External Review Draft)

    Science.gov (United States)

    This draft document presents two case studies of nanoscale titanium dioxide (nano-TiO2) used (1) to remove arsenic from drinking water and (2) as an active ingredient in topical sunscreen. The draft case studies are organized around a comprehensive environmental asses...

  18. Guidelines for interim storage of low level waste

    International Nuclear Information System (INIS)

    Hornibrook, C.; Castagnacci, A.; Clymer, G.; Kelly, J.; Naughton, M.; Saunders, P.; Stoner, P.; Walker, N.; Cazzolli, R.; Dettenmeier, R.; Loucks, L.; Rigsby, M.; Spall, M.; Strum, M.

    1992-12-01

    This report presents an overview of on-site storage of Low Level Waste while providing guidelines for using the complete Interim On-Site Storage of Low Level Waste report series. Overall, this report provides a methodology for planning and implementing on-site storage

  19. Analytical and Experimental Draft Force Evaluation of Plastic Coated Chisel Tines

    Directory of Open Access Journals (Sweden)

    M Barzegar Tabrizi

    2017-10-01

    Full Text Available Introduction Improving the efficiency of all agricultural operations has always been important for farmers and engineers. It is well known that the force required for cutting a soil using narrow blades is a function of soil and environmental physical properties, tool shape geometry and the tool’s surface characteristics like soil-tool adhesion and friction. Soil tool adhesion can reduce ploughing efficiency and quality. It may also halt the movement of tillage machines in more severe conditions. Adhesion can also disable some machine abilities, which can result in a significant reduction of machine performance. Adhesion of the soil to seed-bed preparation tools like furrowers can significantly affect the germination rate. Reducing soil tool adhesion of furrowers can reduce draft force and improve ploughing efficiency. Many researchers have worked on methods of reducing draft force by modifying the surface material and/or surface texture of the plough tools. A good prediction on draft force of a tool before producing it has always been important for farmers and engineers. There are some models for predicting the draft force of narrow blades in soil. McKyes-Ali’s model is widely used because of its accuracy and simplicity. Ultra-high molecular weight polythene (UHMW-PE is a polymer with ultra-high weight and long molecular chains and is well known for its outstanding physical and chemical properties and self-cleaning abilities, which reduce soil-tool adhesion. The aim of this study was to investigate usability of UHMW-PE coated furrower tines for draft force. Analytical and experimental investigations were carried out during the research. A comparison was conducted between the analytical and the experimental method. The results of this comparison can be used to determine reliability of the analytical model for predicting the draft force improvement caused by the surface modification on tines using different surface coatings. Materials and

  20. The Homestake Interim Laboratory and Homestake DUSEL

    Science.gov (United States)

    Lesko, Kevin T.

    2011-12-01

    The former Homestake gold mine in Lead South Dakota is proposed for the National Science Foundation's Deep Underground Science and Engineering Laboratory (DUSEL). The gold mine provides expedient access to depths in excess of 8000 feet below the surface (>7000 mwe). Homestake's long history of promoting scientific endeavours includes the Davis Solar Neutrino Experiment, a chlorine-based experiment that was hosted at the 4850 Level for more than 30 years. As DUSEL, Homestake would be uncompromised by competition with mining interests or other shared uses. The facility's 600-km of drifts would be available for conversion for scientific and educational uses. The State of South Dakota, under Governor Rounds' leadership, has demonstrated exceptionally strong support for Homestake and the creation of DUSEL. The State has provided funding totalling $46M for the preservation of the site for DUSEL and for the conversion and operation of the Homestake Interim Laboratory. Motivated by the strong educational and outreach potential of Homestake, the State contracted a Conversion Plan by world-recognized mine-engineering contractor to define the process of rehabilitating the facility, establishing the appropriate safety program, and regaining access to the facility. The State of South Dakota has established the South Dakota Science and Technology Authority to oversee the transfer of the Homestake property to the State and the rehabilitation and preservation of the facility. The Homestake Scientific Collaboration and the State of South Dakota's Science and Technology Authority has called for Letters of Interest from scientific, educational and engineering collaborations and institutions that are interested in hosting experiments and uses in the Homestake Interim Facility in advance of the NSF's DUSEL, to define experiments starting as early as 2007. The Homestake Program Advisory Committee has reviewed these Letters and their initial report has been released. Options for

  1. The Homestake Interim Laboratory and Homestake DUSEL

    International Nuclear Information System (INIS)

    Lesko, Kevin T.

    2011-01-01

    The former Homestake gold mine in Lead South Dakota is proposed for the National Science Foundation's Deep Underground Science and Engineering Laboratory (DUSEL). The gold mine provides expedient access to depths in excess of 8000 feet below the surface (>7000 mwe). Homestake's long history of promoting scientific endeavours includes the Davis Solar Neutrino Experiment, a chlorine-based experiment that was hosted at the 4850 Level for more than 30 years. As DUSEL, Homestake would be uncompromised by competition with mining interests or other shared uses. The facility's 600-km of drifts would be available for conversion for scientific and educational uses. The State of South Dakota, under Governor Rounds' leadership, has demonstrated exceptionally strong support for Homestake and the creation of DUSEL. The State has provided funding totalling $46M for the preservation of the site for DUSEL and for the conversion and operation of the Homestake Interim Laboratory. Motivated by the strong educational and outreach potential of Homestake, the State contracted a Conversion Plan by world-recognized mine-engineering contractor to define the process of rehabilitating the facility, establishing the appropriate safety program, and regaining access to the facility. The State of South Dakota has established the South Dakota Science and Technology Authority to oversee the transfer of the Homestake property to the State and the rehabilitation and preservation of the facility. The Homestake Scientific Collaboration and the State of South Dakota's Science and Technology Authority has called for Letters of Interest from scientific, educational and engineering collaborations and institutions that are interested in hosting experiments and uses in the Homestake Interim Facility in advance of the NSF's DUSEL, to define experiments starting as early as 2007. The Homestake Program Advisory Committee has reviewed these Letters and their initial report has been released. Options for

  2. Comments from the Developmental Neurotoxicology Committee of the Japanese Teratology Society on the OECD Guideline for the Testing of Chemicals, Proposal for a New Guideline 426, Developmental Neurotoxicity Study, Draft Document (October 2006 version), and on the Draft Document of the Retrospective Performance Assessment of the Draft Test Guideline 426 on Developmental Neurotoxicity.

    Science.gov (United States)

    Ema, Makoto; Fukui, Yoshihiro; Aoyama, Hiroaki; Fujiwara, Michio; Fuji, Junichiro; Inouye, Minoru; Iwase, Takayuki; Kihara, Takahide; Oi, Akihide; Otani, Hiroki; Shinomiya, Mitsuhiro; Sugioka, Kozo; Yamano, Tsunekazu; Yamashita, Keisuke H; Tanimura, Takashi

    2007-06-01

    In October 2006, a new revision of the draft guideline (OECD Guideline for the Testing of Chemicals, Proposal for a New Guideline 426. Developmental Neurotoxicity Study) and Draft Document of the Retrospective Performance Assessment (RPA) of the Draft Test Guideline 426 on Developmental Neurotoxicity were distributed following incorporation of the results of the Expert Consultation Meeting in Tokyo on May 24-26, 2005. The draft guideline consists of 50 paragraphs and an appendix with 102 references; and the draft RPA consists of 37 paragraphs with 109 references. National coordinators were requested to arrange for national expert reviews of these draft documents in their member countries. Members of the Developmental Neurotoxicology (DNT) Committee of the Japanese Teratology Society (JTS) reviewed, discussed, and commented on the draft Test Guideline Proposal. The DNT Committee of the JTS also commented on the draft document of the RPA. These comments were sent to the OECD Secretariat. The DNT Committee of the JTS expects the comments to be useful for the finalization of these draft documents.

  3. Sea ice draft in the Weddell Sea, measured by upward looking sonars

    Directory of Open Access Journals (Sweden)

    A. Behrendt

    2013-06-01

    Full Text Available The presented database contains time-referenced sea ice draft values from upward looking sonar (ULS measurements in the Weddell Sea, Antarctica. The sea ice draft data can be used to infer the thickness of the ice. They were collected during the period 1990–2008. In total, the database includes measurements from 13 locations in the Weddell Sea and was generated from more than 3.7 million measurements of sea ice draft. The files contain uncorrected raw drafts, corrected drafts and the basic parameters measured by the ULS. The measurement principle, the data processing procedure and the quality control are described in detail. To account for the unknown speed of sound in the water column above the ULS, two correction methods were applied to the draft data. The first method is based on defining a reference level from the identification of open water leads. The second method uses a model of sound speed in the oceanic mixed layer and is applied to ice draft in austral winter. Both methods are discussed and their accuracy is estimated. Finally, selected results of the processing are presented. The data can be downloaded from doi:10.1594/PANGAEA.785565.

  4. 1 CFR 15.10 - Information on drafting and publication.

    Science.gov (United States)

    2010-01-01

    ... 1 General Provisions 1 2010-01-01 2010-01-01 false Information on drafting and publication. 15.10... drafting and publication. The Director of the Federal Register may prepare, and distribute to agencies... chapter. The Director may also develop and conduct programs of technical instruction. ...

  5. Interim Feed The Future Population Based Assessment of Cambodia

    Data.gov (United States)

    US Agency for International Development — This is the interim population based survey of Feed the Future in Cambodia for 2015. The data is split into survey modules. Modules A through C includes location...

  6. Jovan Hadžić's civil procedure code draft (1845

    Directory of Open Access Journals (Sweden)

    Stanković Uroš

    2013-01-01

    Full Text Available The article sheds light on civil procedure code draft prepared by renown Serbian lawmaker Jovan Hadžić in 1845. Contrarily to Hadžić's work on producing civil code, his efforts to write civil procedure code are to a large extent obscure. Original text of the draft has not been found. Therefore, one is imposed to reconstruct it with the aid of auxiliary sources, among which the record kept by the commission tasked with revision of the draft, has prevailing significance. The author made an attempt to determine the structure of the draft, as well as the contents of its provisions as accurately as possible, wherein the remarks that the Commission had made were of most assistance. Hadžić consigned his draft to the Prince Aleksandar Karađorđević on August 4th 1845. The Draft consisted of introduction and three parts. The introduction comprised of general provisions. Therein was stipulated principle of trial by written declaration, determined five kinds of courts before which civil procedure should occur and established vacatio legis. The first and concviningly largest part of the Draft was most likely entitled 'On principal litigations and litigation evidence' ('O parnicama glavnima i parničnim dokazatelstvima'. It included diverse rules, such as proceedings before peace courts, proceedings before district courts, ordinary course of litigation (i. e. rules in terms of filing a complaint, scheduling of hearings, subpoenas delivery, procurement of evidence, trial, bankruptcy proceedings, forms of evidence, presentation of evidence and deliberation of judgment, appellate procedure, new trial and enforcement procedure. The third part subsumed the title named 'likvidacija' (literally 'liquidation', whose contents is undeterminable on the basis of existing text of the draft, resolution of bankruptcy proceedings via settlement, resolution of regular litigations via settlement, title named 'on special proceedings and advantages' ('o osobenom

  7. Fuel supply shutdown facility interim operational safety requirements

    International Nuclear Information System (INIS)

    Besser, R.L.; Brehm, J.R.; Benecke, M.W.; Remaize, J.A.

    1995-01-01

    These Interim Operational Safety Requirements (IOSR) for the Fuel Supply Shutdown (FSS) facility define acceptable conditions, safe boundaries, bases thereof, and management or administrative controls to ensure safe operation. The IOSRs apply to the fuel material storage buildings in various modes (operation, storage, surveillance)

  8. Draft of textbook focused on indirect taxes

    OpenAIRE

    Nováková, Hana

    2012-01-01

    The diploma thesis is about draft of textbook which is focused on indirect taxes for business school. The thesis is divided into theoretical and practical part. The theoretical part is focused on teaching tax issues at business school. Readers are introduced with basic studying documents, for example framework educational program and school educational program. In the following part I have conducted didactic analysis of curriculum and textbook of economics for business schools. The draft of t...

  9. 11{sup th} and 12{sup th} draft laws amending the Atomic Energy Act; Die Gesetzentwuerfe zur elften und zwoelften Aenderung des Atomgesetzes

    Energy Technology Data Exchange (ETDEWEB)

    Schneider, Horst

    2010-11-15

    On September 28, 2010, the German Federal Government adopted the energy concept and, in addition, 2 draft amendments to the Atomic Energy Act to assist the coalition groups in the wording. The coalition groups tabled the 2 drafts in the Federal Parliament the same day. The subject of the 11{sup th} amending law is the extended plant life of nuclear power plants, that of the 12{sup th} amending law, the transposition into national law of the EURATOM Safety Directive of June 2009, the re-introduction of expropriation provisions about final storage, and the duty of operators to enhance the safety of existing nuclear power plants. The Federal Government's energy concept contains this statement about nuclear power: An extension for a limited period of time of the plant life of existing nuclear power plants makes a key contribution to ensuring, for an interim period of time, the three energy policy goals of climate protection, economy, and security of supply in Germany. It eases the way into the era of renewable energies, especially by its controlling effect on the price of electricity and by reducing greenhouse gas emissions related to power production.'' The amendment to the Atomic Energy Act, which does not require the consent of the Federal Council, extends the operating life of nuclear power plants by an average of 12 years. The EURATOM Safety Directive must be transposed into national law by July 22, 2011. The draft of a 12{sup th} amendment to the Atomic Energy Act submitted to this end, which also requires no consent of the Federal Council, bases its reasoning on the fact that most of the important requirements in the Directive had already been taken care of in Germany. Under the 12{sup th} amendment to the Atomic Energy Act, the expropriation regulations deemed to be necessary for repository storage, which had been introduced in the 1998 amendment to the Atomic Energy Act and abolished by the opt-out amendment of 2002, are to be reinstated. (orig.)

  10. Drafting. A Bilingual Text = Dibujo Mecanico. Un Texto Bilingue.

    Science.gov (United States)

    Los Angeles Unified School District, CA. Div. of Career and Continuing Education.

    This bilingual instructional text, one in a series of six texts covering various vocational and technical topics, provides secondary level English and Spanish instruction in drafting. Addressed in the individual units are the following topics: safety, drafting tools and techniques, sketching, geometric construction, working drawings, sectioning,…

  11. An allowable cladding peak temperature for spent nuclear fuels in interim dry storage

    Science.gov (United States)

    Cha, Hyun-Jin; Jang, Ki-Nam; Kim, Kyu-Tae

    2018-01-01

    Allowable cladding peak temperatures for spent fuel cladding integrity in interim dry storage were investigated, considering hydride reorientation and mechanical property degradation behaviors of unirradiated and neutron irradiated Zr-Nb cladding tubes. Cladding tube specimens were heated up to various temperatures and then cooled down under tensile hoop stresses. Cool-down specimens indicate that higher heat-up temperature and larger tensile hoop stress generated larger radial hydride precipitation and smaller tensile strength and plastic hoop strain. Unirradiated specimens generated relatively larger radial hydride precipitation and plastic strain than did neutron irradiated specimens. Assuming a minimum plastic strain requirement of 5% for cladding integrity maintenance in interim dry storage, it is proposed that a cladding peak temperature during the interim dry storage is to keep below 250 °C if cladding tubes are cooled down to room temperature.

  12. 77 FR 29317 - Fiscal Year 2012 Draft Work Plan

    Science.gov (United States)

    2012-05-17

    ... DENALI COMMISSION Fiscal Year 2012 Draft Work Plan AGENCY: Denali Commission. ACTION: Notice... Commission develop proposed work plans for future spending and that the annual Work Plan be published in the... Commission Draft Work Plan for Federal Fiscal Year 2012. DATES: Comments and related material to be received...

  13. 17 CFR 210.8-03 - Interim financial statements.

    Science.gov (United States)

    2010-04-01

    ... 17 Commodity and Securities Exchanges 2 2010-04-01 2010-04-01 false Interim financial statements... AND CONTENT OF AND REQUIREMENTS FOR FINANCIAL STATEMENTS, SECURITIES ACT OF 1933, SECURITIES EXCHANGE... ADVISERS ACT OF 1940, AND ENERGY POLICY AND CONSERVATION ACT OF 1975 Article 8 Financial Statements of...

  14. Options for the interim storage of spent fuel

    International Nuclear Information System (INIS)

    Kromar, M.; Kurincic, B.

    1995-01-01

    Different concepts for the interim storage of spent fuel arising from operation of a NPP are discussed. We considered at reactor as well as away from reactor storage options. Included are enhancements of existing storage capabilities and construction of a new wet or dry storage facility. (author)

  15. Glass packages in interim storage

    International Nuclear Information System (INIS)

    Jacquet-Francillon, N.

    1994-10-01

    This report summarize the current state of knowledge concerning the behavior of type C waste packages consisting of vitrified high-level solutions produced by reprocessing spent fuel. The composition and the physical and chemical properties of the feed solutions are reviewed, and the vitrification process is described. Sodium alumino-borosilicate glass compositions are generally employed - the glass used at la Hague for LWR fuel solutions, for example, contains 45 % SiO 2 . The major physical, chemical, mechanical and thermal properties of the glass are reviewed. In order to allow their thermal power to diminish, the 3630 glass packages produced (as of January 1993) in the vitrification facilities at Marcoule and La Hague are placed in interim storage for several decades. The actual interim storage period has not been defined, as it is closely related to the concept and organization selected for the final destination of the packages: a geological repository. The glass behavior under irradiation is described. Considerable basic and applied research has been conducted to assess the aqueous leaching behavior of nuclear containment glass. The effects of various repository parameters (temperature, flow rate, nature of the environmental materials) have been investigated. The experimental findings have been used to specify a model describing the kinetics of aqueous corrosion of the glass. More generally all the ''source term'' models developed in France by the CEA or by ANDRA are summarized. (author). 152 refs., 33 figs

  16. Replacement of a hopeless maxillary central incisor: a technique for the fabrication of an immediate implant-supported interim restoration.

    Science.gov (United States)

    Graiff, Lorenzo; Vigolo, Paolo

    2012-04-01

    Placement of a dental implant and an interim restoration in the esthetic zone immediately following tooth extraction is now a common procedure. However, in such clinical situations, the fabrication of an appropriate interim restoration may be challenging. The aim of this article is to present a technique for modifying the extracted tooth so it can be used as an implant-supported interim restoration.

  17. [Critical evaluation of the first draft of DSM-V].

    Science.gov (United States)

    Frances, A

    2011-02-16

    Critical evaluation of DSM-V first draft This is an evaluation of the first DSM-V (Diagnostic and Statistical Manual of Mental Disorders-V) draft from the DSM-IV chairman. First, a brief history of DSM is reported. Then, major reasons for present controversies and the threat they raise to APA leadership in the field are discussed. Third point is careful recollection of the several conflicting aspects of the DSM-V draft, paying attention to drawbacks and their implications for future clinical practice, research and forensic activity. Comment is finally provided about APA (American Psychiatric Association) decisions aimed at reaching more consensus about this basic instrument of American psychiatry.

  18. Fusion Breeder Program interim report

    International Nuclear Information System (INIS)

    Moir, R.; Lee, J.D.; Neef, W.

    1982-01-01

    This interim report for the FY82 Fusion Breeder Program covers work performed during the scoping phase of the study, December, 1981-February 1982. The goals for the FY82 study are the identification and development of a reference blanket concept using the fission suppression concept and the definition of a development plan to further the fusion breeder application. The context of the study is the tandem mirror reactor, but emphasis is placed upon blanket engineering. A tokamak driver and blanket concept will be selected and studied in more detail during FY83

  19. Effectiveness of interim remedial actions at the Niagara Falls Storage Site

    International Nuclear Information System (INIS)

    Devgun, J.S.; Beskid, N.J.; Seay, W.M.; McNamee, E.

    1990-01-01

    There are 190,000 m 3 of contaminated soils, wastes, and residues stored at the Niagara Falls Storage Site (NFSS). The residues have a volume of 18,000 m 3 and contain about 1,930 Ci of 226 Ra, which accounts for most of the radioactivity. Since 1980, actions have been taken to minimize potential radiological risks and prevent radionuclide migration. Interim actions included capping vents, sealing pipes, relocating the perimeter fence (to limit radon risk), transferring and consolidating wastes, upgrading storage buildings, constructing a clay cutoff wall (to limit potential ground-water transport of contaminants), treating and releasing contaminated water, using a synthetic liner, and using an interim clay cap. An interim waste containment facility was completed in 1986. Environmental monitoring showed a decrease in radon concentrations and in external gamma radiation from 1982 to 1986; levels have been stable since 1986. Uranium and radium concentrations in surface water have decreased; very low concentrations have been detected in stream sediments, and concentrations in ground water have remained stable. Recent monitoring showed that NFSS is in compliance with the U.S. Department of Energy's (DOE's) radiation protection standards

  20. Advanced Technical Drafting (Industrial Arts) Curriculum Guide. Bulletin 1751.

    Science.gov (United States)

    Louisiana State Dept. of Education, Baton Rouge. Div. of Vocational Education.

    This curriculum guide contains materials for a 17-unit course in advanced technical drafting, a followup to the basic technical drafting course in the industrial arts curriculum for grades 10-12. It is intended for use by industrial arts teachers, supervisors, counselors, administrators, and teacher educators. A three-page course overview provides…

  1. German Approach for the Transport of Spent Fuel Packages after Interim Storage

    International Nuclear Information System (INIS)

    Wille, Frank; Wolff, Dietmar; Droste, Bernhard; Voelzke, Holger

    2014-01-01

    In Germany the concept of dry interim storage of spent nuclear fuel in dual purpose metal casks is implemented, currently for periods of up to 40 years. The casks being used have an approved package design in accordance with the international transport regulations. The license for dry storage is granted on the German Atomic Energy Act with respect to the recently (in 2012) revised 'Guidelines for dry cask storage of spent nuclear fuel and heat-generating waste' by the German Waste management Commission (ESK) which are very similar to the former RSK (reactor safety commission) guidelines. For transport on public routes between or after long term interim storage periods, it has to be ensured that the transport and storage casks fulfil the specifications of the transport approval or other sufficient properties which satisfy the proofs for the compliance of the safety objectives at that time. In recent years the validation period of transport approval certificates for manufactured, loaded and stored packages were discussed among authorities and applicants. A case dependent system of 3, 5 and 10 years was established. There are consequences for the safety cases in the Package Design Safety Report including evaluation of long term behavior of components and specific operating procedures of the package. Present research and knowledge concerning the long term behavior of transport and storage cask components have to be consulted as well as experiences from interim cask storage operations. Challenges in the safety assessment are e.g. the behavior of aged metal and elastomeric seals under IAEA test conditions to ensure that the results of drop tests can be transferred to the compliance of the safety objectives at the time of transport after the interim storage period (aged package). Assessment methods for the material compatibility, the behavior of fuel assemblies and the aging behavior of shielding parts are issues as well. This paper describes the state

  2. Drafting Lab Management Guide.

    Science.gov (United States)

    Ohio State Univ., Columbus. Instructional Materials Lab.

    This manual was developed to guide drafting instructors and vocational supervisors in sequencing laboratory instruction and controlling the flow of work for a 2-year machine trades training program. The first part of the guide provides information on program management (program description, safety concerns, academic issues, implementation…

  3. MX draft proposal

    International Nuclear Information System (INIS)

    1976-01-01

    This is an interim report on the design of a large mirror fusion experiment, MX, that LLL is proposing to construct in FY 78-80. The MX experiment brings together the main elements of our present concept of a mirror reactor: a superconducting magnet and neutral beam injection. The plasma will be created by pulsed beam injection into a plasma stream injected along the magnetic field through the mirrors. This will be followed by sustained injection of high energy neutrals to achieve steady-state conditions for 0.5 to several seconds

  4. Evaluations for draft reports on geological disposal

    International Nuclear Information System (INIS)

    Maekawa, Keisuke; Igarashi, Hiroshi

    2002-10-01

    This report summarizes the results of the technical evaluations on two reports which are named as 'Overview of the Geological Disposal Facility' and Considerable Factors on Selection of Potential Sites for Geological Disposal' drafted by NUMO (Nuclear Waste Management Organization of Japan). The review of each draft report has been referred to committee (held on 9th September, 2002) and working group (held on 1st October, 2002) which were organized in order to confirm a progress of implementation of geological disposal by government. (author)

  5. 1987 Federal interim storage fee study: A technical and economic analysis

    International Nuclear Information System (INIS)

    1987-09-01

    This document is the latest in a series of reports that are published annually by Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This information in the report, which was prepared by E.R. Johnson Associates under subcontract to PNL, will be used by the DOE to establish a payment schedule for interim storage of spent nuclear fuel under the Federal Interim Storage (FIS) Program, which was mandated by the Nuclear Waste Policy Act of 1982. The information in this report will be used to establish the schedule of charges for FIS services for the year commencing January 1, 1988. 13 tabs

  6. 1987 Federal interim storage fee study: A technical and economic analysis

    Energy Technology Data Exchange (ETDEWEB)

    1987-09-01

    This document is the latest in a series of reports that are published annually by Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This information in the report, which was prepared by E.R. Johnson Associates under subcontract to PNL, will be used by the DOE to establish a payment schedule for interim storage of spent nuclear fuel under the Federal Interim Storage (FIS) Program, which was mandated by the Nuclear Waste Policy Act of 1982. The information in this report will be used to establish the schedule of charges for FIS services for the year commencing January 1, 1988. 13 tabs.

  7. Investigations into dynamics of a draft of mine cars with two locomotives during electric braking

    Energy Technology Data Exchange (ETDEWEB)

    Sikora-Iliew, R; Szklarski, L; Thuc, Thai Duy

    1983-03-01

    The computerized simulation of electric braking of a draft of GRANBY-5 mine cars and two locomotives (Ld2 locomotives with LDO30 electric series motors) is discussed. The following stages of simulation are analyzed: constructing a mathematical model of the draft of mine cars during electric (dynamic) braking, equations which describe dynamic states of locomotives, mine cars and electric motors during dynamic braking, equations for stability assessment of the draft during dynamic braking. The analog model for simulation of dynamic braking of the draft is given. Simulation results are shown in 10 diagrams. The WAT-1000 hybrid computer is used. Simulation shows that dynamic braking causes occurrence of maximum forces in the couplers between a locomotive and a mine car. When two locomotives are used the maximum force in couplers is lower than in a draft with one locomotive. Braking distance does not depend on position of locomotives in a draft of mine cars. Doubling draft speed causes braking distance to increase by 4 times. Optimum stability conditions of a draft of mine cars are guaranteed when one locomotive is placed at the draft head and a second is separated from the first one by one third of the draft length. 6 references

  8. 105-C Reactor interim safe storage project technology integration plan

    International Nuclear Information System (INIS)

    Pulsford, S.K.

    1997-01-01

    The 105-C Reactor Interim Safe Storage Project Technology Integration Plan involves the decontamination, dismantlement, and interim safe storage of a surplus production reactor. A major goal is to identify and demonstrate new and innovative D and D technologies that will reduce costs, shorten schedules, enhance safety, and have the potential for general use across the RL complex. Innovative technologies are to be demonstrated in the following areas: Characterization; Decontamination; Waste Disposition; Dismantlement, Segmentation, and Demolition; Facility Stabilization; and Health and Safety. The evaluation and ranking of innovative technologies has been completed. Demonstrations will be selected from the ranked technologies according to priority. The contractor team members will review and evaluate the demonstration performances and make final recommendations to DOE

  9. Single-Shell Tank (SST) Interim Stabilization Project Plan

    International Nuclear Information System (INIS)

    VLADIMIROFF, D.T.; BOYLES, V.C.

    2000-01-01

    This project plan establishes the management framework for the conduct of the CHG Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organization structure, roles, responsibilities, and interfaces; and operational methods. This plan serves as the project executional baseline

  10. Interim report on long range plan for nuclear physics

    International Nuclear Information System (INIS)

    Anon.

    1995-01-01

    The interim report on the updated NSAC Long Range Plan for Nuclear Physics will be presented to the community for discussion and comment before submission to the funding agencies. The presentation will be coordinated by E. Moniz chair of NSAC

  11. 75 FR 9613 - Draft NIJ Restraints Standard for Criminal Justice

    Science.gov (United States)

    2010-03-03

    ... DEPARTMENT OF JUSTICE Office of Justice Programs [OJP (NIJ) Docket No. 1512] Draft NIJ Restraints Standard for Criminal Justice AGENCY: National Institute of Justice, Office of Justice Programs, DOJ. ACTION: Notice of Draft NIJ Restraints Standard for Criminal Justice and Certification Program...

  12. 76 FR 61402 - Draft Nuclear Regulatory Commission Fiscal Year 2012-2016 Strategic Plan

    Science.gov (United States)

    2011-10-04

    ...-2016 Strategic Plan AGENCY: Nuclear Regulatory Commission. ACTION: Draft NUREG; request for comment... comment on draft NUREG-1614, Volume 5. ``U.S. Nuclear Regulatory Commission, FY 2012-2016 Strategic Plan,'' dated September 2011. The NRC's draft FY 2012-2016 strategic plan describes the agency's mission and...

  13. Federal Interim Storage program

    International Nuclear Information System (INIS)

    Johnson, E.R.; McBride, J.A.

    1984-01-01

    The DOE has developed a program for providing Federal Interim Storage servies for spent nuclear fuel which complies with the requirements of the Nuclear Waste Policy Act of 1982. Although very little constructive activity in providing storage facilities can be undertaken by DOE until fuel has been certified by NRC as eligible for FIS, DOE planning and background information is such as to provide reasonable assurance that its obligations can be fulfilled when the required certifications have been issued. A fee structure providing fuel recovery of all costs associated with the FIS program, as required by the Act, has been developed. It provides for an equitable distribution of costs among users, based on the quantity of fuel requiring storage

  14. Tank Farm Interim Surface Barrier Materials And Runoff Alternatives Study

    International Nuclear Information System (INIS)

    Holm, M.J.

    2009-01-01

    This report identifies candidate materials and concepts for interim surface barriers in the single-shell tank farms. An analysis of these materials for application to the TY tank farm is also provided.

  15. Design optimization of hydraulic turbine draft tube based on CFD and DOE method

    Science.gov (United States)

    Nam, Mun chol; Dechun, Ba; Xiangji, Yue; Mingri, Jin

    2018-03-01

    In order to improve performance of the hydraulic turbine draft tube in its design process, the optimization for draft tube is performed based on multi-disciplinary collaborative design optimization platform by combining the computation fluid dynamic (CFD) and the design of experiment (DOE) in this paper. The geometrical design variables are considered as the median section in the draft tube and the cross section in its exit diffuser and objective function is to maximize the pressure recovery factor (Cp). Sample matrixes required for the shape optimization of the draft tube are generated by optimal Latin hypercube (OLH) method of the DOE technique and their performances are evaluated through computational fluid dynamic (CFD) numerical simulation. Subsequently the main effect analysis and the sensitivity analysis of the geometrical parameters of the draft tube are accomplished. Then, the design optimization of the geometrical design variables is determined using the response surface method. The optimization result of the draft tube shows a marked performance improvement over the original.

  16. Business plan: Supplemental draft environmental impact statement. Volume 2. Appendices

    International Nuclear Information System (INIS)

    1995-02-01

    This document contains the appendices for the Bonneville Power Administration (BPA) Business Plan: Supplemental Draft Environmental Impact Statement. Included are: BPA products and services; Rate design; Methodology and assumptions for numerical analysis; Retail utility operations; Comments and responses to the draft business plan EIS

  17. 49 CFR 520.23 - Preparation of draft environmental impact statements.

    Science.gov (United States)

    2010-10-01

    ... social, economic, and environmental consequences. (b) Form and content requirements. Attachment 1 of this... environmental issues involved and take responsibility for the scope and content of draft and final environmental... 49 Transportation 6 2010-10-01 2010-10-01 false Preparation of draft environmental impact...

  18. Business Plan : Supplemental Draft Environmental Impact Statement, Volume 2, Appendices.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-02-01

    This document contains the appendices for the Bonneville Power Administration (BPA) Business Plan: Supplemental Draft Environmental Impact Statement. Included are: BPA products and services; Rate design; Methodology and assumptions for numerical analysis; Retail utility operations; Comments and responses to the draft business plan EIS.

  19. Development of Accident Scenario for Interim Spent Fuel Storage Facility Based on Fukushima Accident

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Dongjin; Choi, Kwangsoon; Yoon, Hyungjoon; Park, Jungsu [KEPCO-E and C, Yongin (Korea, Republic of)

    2014-05-15

    700 MTU of spent nuclear fuel is discharged from nuclear fleet every year and spent fuel storage is currently 70.9% full. The on-site wet type spent fuel storage pool of each NPP(nuclear power plants) in Korea will shortly exceed its storage limit. Backdrop, the Korean government has rolled out a plan to construct an interim spent fuel storage facility by 2024. However, the type of interim spent fuel storage facility has not been decided yet in detail. The Fukushima accident has resulted in more stringent requirements for nuclear facilities in case of beyond design basis accidents. Therefore, there has been growing demand for developing scenario on interim storage facility to prepare for beyond design basis accidents and conducting dose assessment based on the scenario to verify the safety of each type of storage.

  20. Replacement Nuclear Research Reactor. Supplement to Draft Environmental Impact Statement. Volume 3

    International Nuclear Information System (INIS)

    1999-01-01

    The Draft Environmental Impact Statement for a replacement research reactor at Lucas Heights, was available for public examination and comment for some three months during 1998. A Supplement to the Draft Environmental Impact Statement (Draft EIS) has been completed and was lodged with Environment Australia on 18 January 1999. The Supplement is an important step in the overall environmental assessment process. It reviews submissions received and provides the proponent's response to issues raised in the public review period. General issues extracted from submissions and addressed in the Supplement include concern over liability issues, Chernobyl type accidents, the ozone layer and health issues. Further studies, relating to issues raised in the public submission process, were undertaken for the Supplementary EIS. These studies confirm, in ANSTO's view, the findings of the Draft EIS and hence the findings of the Final EIS are unchanged from the Draft EIS

  1. Replacement Nuclear Research Reactor. Supplement to Draft Environmental Impact Statement. Volume 3

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-01-01

    The Draft Environmental Impact Statement for a replacement research reactor at Lucas Heights, was available for public examination and comment for some three months during 1998. A Supplement to the Draft Environmental Impact Statement (Draft EIS) has been completed and was lodged with Environment Australia on 18 January 1999. The Supplement is an important step in the overall environmental assessment process. It reviews submissions received and provides the proponent`s response to issues raised in the public review period. General issues extracted from submissions and addressed in the Supplement include concern over liability issues, Chernobyl type accidents, the ozone layer and health issues. Further studies, relating to issues raised in the public submission process, were undertaken for the Supplementary EIS. These studies confirm, in ANSTO`s view, the findings of the Draft EIS and hence the findings of the Final EIS are unchanged from the Draft EIS

  2. Ad interim legal remedy in case of large projects

    International Nuclear Information System (INIS)

    Limberger, J.

    1985-01-01

    Action for ad interim judicial relief in response to large projects approved of by the authorities very frequently take several years until a decision is taken by the court. Experience has shown that this applies in particular to large projects such as the construction of nuclear power plants, large-size industrial plants, or airports. It has become regular practice by the authorities concerned to issue an order for immediate execution upon the plan approving decision and granting of licence for said projects, in accordance with section 80, sub-section (2), no.4 of the VwGO. The problems thus created with regard to interim legal remedy sought by the parties concerned are of great significance. The book in hand discusses the question as to whether the practice of the administrative authorities and the courts satisfies the requirements embodied in the law, to provide for efficient legal protection. (orig./HSCH) [de

  3. 49 CFR 37.169 - Interim requirements for over-the-road bus service operated by private entities.

    Science.gov (United States)

    2010-10-01

    ... of such devices, shall be permitted in the passenger compartment. When the bus is at rest at a stop... 49 Transportation 1 2010-10-01 2010-10-01 false Interim requirements for over-the-road bus service... Interim requirements for over-the-road bus service operated by private entities. (a) Private entities...

  4. Acceptable TRU packaging for interim storage and/or terminal isolation: FY-1977 final report

    International Nuclear Information System (INIS)

    Doty, J.W.; Peterson, J.B.

    1978-01-01

    A program was conducted for the definition and demonstration of acceptable waste packages for defense transuranic waste for interim storage and terminal isolation. During FY-1977, a Contractor Questionnaire was used to gather pertinent data and to assess contractor concerns. This information was integrated into basic application data in the form of a checklist. Conceptual Container Design Specifications were developed by analyzing and evaluating the application data against Federal Regulations and interim/terminal storage constraints

  5. 75 FR 7591 - Guidance on Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at CERCLA and...

    Science.gov (United States)

    2010-02-22

    ... ENVIRONMENTAL PROTECTION AGENCY [EPA-HQ-SFUND-2009-0907; FRL-9114-6] RIN 2050-ZA05 Guidance on Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at CERCLA and RCRA Sites; Extension of... Interim Preliminary Remediation Goals for Dioxin in Soil at Comprehensive Environmental Response...

  6. Individual shareholders’ understanding of the content of interim reports of South African listed retail companies

    Directory of Open Access Journals (Sweden)

    Johan GI Oberholster

    2015-05-01

    Full Text Available A number of studies conducted, and reports published, by international and local accounting bodies have found that the proliferation of disclosures in financial reports has hampered users’ understanding of these reports. The reports by accounting bodies also indicate that these users prefer more concise financial reports. These findings, in conjunction with a dearth of recent questionnaire-based research on whether individual shareholders understand the content of financial reports, resulted in this study on whether individual shareholders understand the content of interim reports. The study provides empirical proof that a sound knowledge of business, accounting and economic matters is a prerequisite for understanding interim reports in the case of individual shareholders. The results of the study indicate that individual shareholders have a limited understanding of the content of interim reports as a whole, and that a good knowledge of business and economic matters and of accounting results in an improved understanding of the content of interim reports. In particular, specialisation in accounting in undergraduate and postgraduate degrees, professional qualifications, and work experience in the financial field improve the understanding of individual shareholders.

  7. The shape of natural draft cooling towers

    International Nuclear Information System (INIS)

    Grange, J.L.

    1992-07-01

    The shape of cooling towers is more often designed empirically. There, it is considered from a theoretical point of view. The analysis of dynamic of natural draft and of the air flow in a cooling tower shell is presented. It is shown, that although it is convergent, a tower works like a diffuser for pressure recovery. And it is turbulence that produces a transfer of kinetic energy and allows a good operation of the diffusor. The equations permit to define a shell profile which depends upon the operating conditions of the cooling tower. In the same way, a stability criteria for natural draft depending upon operating conditions is established. A heating model of one meter diameter has been built in a thermal similitude. The turbulence rate has been measured with a hot wire anemometer at the tower exit and visualizations have also been made. Natural draft stability has been studied by these means for four different shell shapes and a wide range of operating conditions. Experimental and theoretical results agree satisfactorily and experiments can be considered as a validation of theory

  8. Strategic Review of Medical Training and Career Structure Interim Report

    OpenAIRE

    Department of Health (Ireland)

    2013-01-01

    Click here to download Strategic Review of Medical Training and Career Structure Interim Report PDF 44kb Click here to download Strategic Review of Medical Training and Career Structure Terms of Reference PDF 59KB

  9. 75 FR 43329 - Interim Final Rules for Group Health Plans and Health Insurance Issuers Relating to Internal...

    Science.gov (United States)

    2010-07-23

    ... 45 CFR Part 147 Interim Final Rules for Group Health Plans and Health Insurance Issuers Relating to... Interim Final Rules for Group Health Plans and Health Insurance Issuers Relating to Internal Claims and... of Labor; Office of Consumer Information and Insurance Oversight, Department of Health and Human...

  10. 78 FR 56271 - FY 2014-2020 Draft VA Strategic Plan

    Science.gov (United States)

    2013-09-12

    ... DEPARTMENT OF VETERANS AFFAIRS FY 2014-2020 Draft VA Strategic Plan AGENCY: Department of Veterans... Affairs (VA) is announcing the availability of the FY 2014-2020 Draft VA Strategic Plan (Strategic Plan... Act of 2010 (GPRAMA) (Pub. L. 111-352). The Strategic Plan provides the Department's long-term...

  11. The Bacteriostasis Study of Nisin for the Raspberry Health Draft Beer

    Science.gov (United States)

    Sun, Jinxu; Zhu, Hui xia; Guo, Jiping; Xiao, Dong Guang

    The raspberry healthy draft beer was obtained by adding the extracting of raspberry into the raw fermentation materials of beer, in order to prolong the shelf life, the different concentrations nisin were added to the the raspberry healthy draft beer, the result shown that nisin could have obvious influence on the shelf life, the shelf life prolonged with nisin concentrations adding, the shelf life raspberry healthy draft beer was 44d after adding 0.02 nisin mg/mL, the shelf life prolonged 36d than blank.

  12. Remedial design report and remedial action work plan for the 100-HR-3 and 100-KR-4 groundwater operable units' interim action

    International Nuclear Information System (INIS)

    1996-09-01

    This document is a combination remedial design report and remedial action work plan for the 100-HR-3 and 100-KR-4 Operable Units (located on the Hanford Site in Richland, Washington) interim action. The interim actions described in this document represent the first of an ongoing program to address groundwater contamination in each operable unit. This document describes the design basis, provides a description of the interim action, and identifies how they will meet the requirements set forth in the interim action Record of Decision

  13. Taxation of Income from Selling Property: Changes of New Income Tax Law Draft

    Directory of Open Access Journals (Sweden)

    Canatay HACIKÖYLÜ

    2016-12-01

    Full Text Available There are provisions in Income Tax Law No. 193 and Corporate Tax Law No. 5520 on the nature and taxation of income that real and legal persons acquire from real estate sales. There have been many changes in these provisions over time, but the changes made didnt meet the needs, and they distorted the systematic structure of the Laws. For these and similar reasons, the income tax law draft has been prepared based on Income Tax Law and Corporate Tax Law. With the draft, the Income Tax Law No. 193 and the Corporate Tax Law No. 5520 will be abolished. Draft is aimed to regulate the procedures and principles regarding the income tax on the income of real persons and institutions. In this study, the current situation and the regulations of the draft will be discussed. Moreover, It will be evaluate whether the regulations in the draft law are sufficient. Suggestions will be put forth to determine and declare the real value of the property in order to achieve the intended objectives in draft.

  14. Report on the long-term interim storage of spent fuels and vitrified wastes; Gutachten zur Langzeitzwischenlagerung abgebrannter Brennelemente und verglaster Abfaelle

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2015-12-03

    Long-term interim storage for several hundred years is an option on the management of high-level radioactive wastes. The decision on final disposal is postponed. Worldwide the long-term interim storage is not part of the disposal concept - a geologic final repository is the ultimate aim. Using today's technology the interim storage over several hundred years is supposed to be uncritical. Aging management is the most important challenge - the renewal of the facilities would have to be expected. Possible social change and their impact on the interim storage problem has not been considered.

  15. 75 FR 22162 - Draft NIJ Duty Holster Retention Standard for Law Enforcement

    Science.gov (United States)

    2010-04-27

    ...In an effort to obtain comments from interested parties, the U.S. Department of Justice, Office of Justice Programs, National Institute of Justice will make available to the general public two draft documents: (1) A draft standard entitled, ``NIJ Duty Holster Retention Standard for Law Enforcement'' and (2) a draft companion document entitled, ``NIJ Duty Holster Retention Certification Program Requirements.'' The opportunity to provide comments on these two documents is open to industry technical representatives, law enforcement agencies and organizations, research, development and scientific communities, and all other stakeholders and interested parties. Those individuals wishing to obtain and provide comments on the draft documents under consideration are directed to the following Web site: http://www.justnet.org.

  16. The Draft Directive on Consumer Rights: Choices Made and Arguments Used

    Directory of Open Access Journals (Sweden)

    Willem H. van Boom

    2009-11-01

    Full Text Available The 2008 proposal for a Directive on Consumer Rights (hereinafter: the Draft aims at reorganizing the acquis of four specific European directives on consumer protection into a more coherent codification of consumer rights. Specifically, it contains rules on precontractual information duties, on withdrawal rights for distance and off-premises contracts, on consumer sales and on general contract terms in consumer contracts. In replacing the four directives with a minimum harmonization character, the Draft marks a further step towards full harmonization of consumer contract law in Europe. This is an unsettling step because the level of protection offered to consumers in the Draft hardly exceeds the level of protection offered by the four directives mentioned earlier. Instead, it diminishes this protection in some regards. In light of all this, the question arises whether the policy choices underlying the Draft are, in fact, convincingly underpinned by solid argumentation. This article addresses this issue by first analyzing the Draft's use of the generic concept of “contracts between consumers and traders”. It is argued that full harmonization of a badly delineated territory is ill-advised. Subsequently, the argumentative power of the policy considerations forwarded by the European Commission in its Regulatory Assessment Study is tested. The article concludes that the Commission’s assessment of expected costs and benefits of the Draft is waver-thin and geared towards persuading the reader of the aptness of choices already made. In some respects, the evidence presented by the Commission is outright unconvincing. At certain points, the Draft even fuels the reader’s suspicion of foregone conclusions. Overall, the need for reduction of the level of protection offered by the current minimum harmonization directives is poorly argued by the Commission and appears, in a number of important ways, not to reflect the socio-economic relationships that

  17. RCA annual report 1996. Draft

    International Nuclear Information System (INIS)

    1997-02-01

    In accordance with Article VII.4 of the Regional Co-operative Agreement for Research, Development and Training Related to Nuclear Science and Technology 1987 and extended in 1992, a draft report of activities for the calendar year 1996 is submitted

  18. Final environmental impact statement for the continued operation of the Pantex Plant and associated storage of nuclear weapon components. Volume 3 -- Comment response

    International Nuclear Information System (INIS)

    1996-11-01

    The Draft Environmental Impact Statement (EIS) for the continued operation of Pantex Plant was published in March 1996. The document assessed the alternatives of no action, relocation of the storage of plutonium components resulting from nuclear weapon disassemble activities at Pantex Plant to another site, and the proposed action (preferred alternative) of continuing operations and increasing the quantity of pits in interim storage at Pantex Plant. This report contains the comments and responses received on the Draft EIS

  19. 75 FR 59268 - Draft Guidance for Industry: Acidified Foods; Availability

    Science.gov (United States)

    2010-09-27

    ... fermented dairy products, such as yogurt, belong to a separate category that is not relevant to the... the draft guidance, processors of non-acidified foods (e.g., some acid foods or fermented foods) who... regulations. Under the draft guidance, processors of acid foods and fermented foods who conclude that such...

  20. 46 CFR 308.303 - Amounts insured under interim binder.

    Science.gov (United States)

    2010-10-01

    ... 308.303 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE Second Seamen's War Risk Insurance § 308.303 Amounts insured under interim binder. The amounts insured are the amounts specified in the Second Seamen's War Risk Policy (1955) or as modified by shipping...

  1. Rules of international law applicable to transfrontier pollution. Draft

    International Nuclear Information System (INIS)

    Anon.

    1983-01-01

    During the 1982 conference of the International Law Association (ILA) in Montreal the ILA discussed and adopted a draft of rules of international law applicable to transfrontier pollution. The draft presents criteria for the definition of transfrontier pollution and sets out rules for the prevention of such pollution and recommendations for a system of multilateral information, consultation, and co-operation in case of energy. (HP) [de

  2. 76 FR 63668 - Guidelines for Preparing and Reviewing Licensing Applications for the Production of Radioisotopes

    Science.gov (United States)

    2011-10-13

    ..., Research and Test Reactors Projects Branch, Division of Policy and Rulemaking, Office of Nuclear Reactor... NUCLEAR REGULATORY COMMISSION [NRC-2011-0135] Guidelines for Preparing and Reviewing Licensing Applications for the Production of Radioisotopes AGENCY: Nuclear Regulatory Commission. ACTION: Draft interim...

  3. Computational study of a low head draft tube and validation with experimental data

    Energy Technology Data Exchange (ETDEWEB)

    Henau, V De; Payette, F A; Sabourin, M [Alstom Power Systems, Hydro 1350 chemin Saint-Roch, Sorel-Tracy (Quebec), J3R 5P9 (Canada); Deschenes, C; Gagnon, J M; Gouin, P, E-mail: vincent.dehenau@power.alstom.co [Hydraulic Machinery Laboratory, Laval University 1065 ave. de la Medecine, Quebec (Canada)

    2010-08-15

    The objective of this paper is to investigate methodologies to improve the reliability of CFD analysis of low head turbine draft tubes. When only the draft tube performance is investigated, the study indicates that draft tube only simulations with an adequate treatment of the inlet boundary conditions for velocity and turbulence are a good alternative to rotor/stator (stage) simulations. The definition of the inlet velocity in the near wall regions is critical to get an agreement between the stage and draft tube only solutions. An average turbulent kinetic energy intensity level and average turbulent kinetic energy dissipation length scale are sufficient as turbulence inlet conditions as long as these averages are coherent with the stage solution. Comparisons of the rotor/stator simulation results to the experimental data highlight some discrepancies between the predicted draft tube flow and the experimental observations.

  4. Environmental Regulatory Compliance Plan for site: Draft characterization of the Yucca Mountain site:Draft

    International Nuclear Information System (INIS)

    1988-01-01

    The objective of the EMMP is to document compliance with the NWPA. To do so, a summary description of site characterization activites is provided, based on the consultation draft of the SCP. Subsequent chpaters identify those technical areas having the potential to be impacted by site characterization activities and the monitoring plans proposed to identify whether those impacts acutally occur. Should monitoring confirm the potential for significant adverse impact, mitigative measures will be developed. In the context of site characterization, mitigation is defined as those changes in site characterization activities that serve to avoid or minimize, to the maximum extent practicle, any significant adverse environmental impacts. Although site characterization activies involve both surface and subsurface activities, it is the surface-based aspect of site characterization that is addressed in detailed by the EMMP. The schedule and duration of these activities is given in the consultation draft of the SCP. A breif summary of all proposed activities is given in the EMMP. 10 refs., 8 figs

  5. Retrievable surface storage: interim storage of solidified high-level waste

    International Nuclear Information System (INIS)

    LaRiviere, J.R.; Nelson, D.C.

    1976-01-01

    Studies have been conducted on retrievable-surface-storage concepts for the interim storage of solidified high-level wastes. These studies have been reviewed by the Panel on Engineered Storage, convened by the Committee on Radioactive Waste Management of the National Research Council-National Academy of Sciences. The Panel has concluded that ''retrievable surface storage is an acceptable interim stage in a comprehensive system for managing high-level radioactive wastes.'' The scaled storage cask concept, which was recommended by the Panel on Engineered Storage, consists of placing a canister of waste inside a carbon-steel cask, which in turn is placed inside a thick concrete cylinder. The waste is cooled by natural convection air flow through an annulus between the cask and the inner wall of the concrete cylinder. The complete assembly is placed above ground in an outdoor storage area

  6. Interim analysis: A rational approach of decision making in clinical trial.

    Science.gov (United States)

    Kumar, Amal; Chakraborty, Bhaswat S

    2016-01-01

    Interim analysis of especially sizeable trials keeps the decision process free of conflict of interest while considering cost, resources, and meaningfulness of the project. Whenever necessary, such interim analysis can also call for potential termination or appropriate modification in sample size, study design, and even an early declaration of success. Given the extraordinary size and complexity today, this rational approach helps to analyze and predict the outcomes of a clinical trial that incorporate what is learned during the course of a study or a clinical development program. Such approach can also fill the gap by directing the resources toward relevant and optimized clinical trials between unmet medical needs and interventions being tested currently rather than fulfilling only business and profit goals.

  7. Interim analysis: A rational approach of decision making in clinical trial

    Directory of Open Access Journals (Sweden)

    Amal Kumar

    2016-01-01

    Full Text Available Interim analysis of especially sizeable trials keeps the decision process free of conflict of interest while considering cost, resources, and meaningfulness of the project. Whenever necessary, such interim analysis can also call for potential termination or appropriate modification in sample size, study design, and even an early declaration of success. Given the extraordinary size and complexity today, this rational approach helps to analyze and predict the outcomes of a clinical trial that incorporate what is learned during the course of a study or a clinical development program. Such approach can also fill the gap by directing the resources toward relevant and optimized clinical trials between unmet medical needs and interventions being tested currently rather than fulfilling only business and profit goals.

  8. 12 CFR 516.20 - What information must I include in my draft business plan?

    Science.gov (United States)

    2010-01-01

    ... business plan? 516.20 Section 516.20 Banks and Banking OFFICE OF THRIFT SUPERVISION, DEPARTMENT OF THE... What information must I include in my draft business plan? If you must submit a draft business plan... described in the savings association's draft business plan; and (d) Demonstrate how applicable requirements...

  9. 78 FR 44117 - Notice of a Public Comment Period on the Draft IRIS Carcinogenicity Assessment for Ethylene Oxide

    Science.gov (United States)

    2013-07-23

    ... Public Comment Period on the Draft IRIS Carcinogenicity Assessment for Ethylene Oxide AGENCY... Carcinogenicity of Ethylene Oxide'' (EPA/635/R-13/128a) and on the draft peer review charge questions. The draft... on the draft Evaluation of the Inhalation Carcinogenicity of Ethylene Oxide and on the draft peer...

  10. 75 FR 63188 - Draft Guidance for Industry: Early Clinical Trials With Live Biotherapeutic Products: Chemistry...

    Science.gov (United States)

    2010-10-14

    ...] Draft Guidance for Industry: Early Clinical Trials With Live Biotherapeutic Products: Chemistry...: Chemistry, Manufacturing, and Control Information'' dated September 2010. The draft guidance provides... Products: Chemistry, Manufacturing, and Control Information'' dated September 2010. The draft guidance...

  11. 78 FR 17653 - Upper Great Plains Wind Energy Draft Programmatic Environmental Impact Statement (DOE/EIS-0408)

    Science.gov (United States)

    2013-03-22

    ... Wildlife Service Upper Great Plains Wind Energy Draft Programmatic Environmental Impact Statement (DOE/EIS... Plains Wind Energy Draft Programmatic Environmental Impact Statement (Draft [[Page 17654

  12. Development of dual-purpose metal cask for interim storage of spent nuclear fuel (1). Outline of cask structure

    International Nuclear Information System (INIS)

    Shimizu, Masashi; Hayashi, Makoto; Kashiwakura, Jun

    2003-01-01

    Spent fuels discharged from nuclear power plants in Japan are planed to be reprocessed at the nuclear fuel recycle plant under construction at Rokkasho-mura. Since the amount of the spent fuels exceeds that of recycled fuel, the spent fuels have to be properly stored and maintained as recycle fuel resource until the beginning of the reprocessing. For that sake, interim storage installations are being constructed outside the nuclear power plants by 2010. The storage dry casks have been practically used as the interim storage in the nuclear power plants. From this reason, the storage system using the storage dry casks is promising as the interim storage installations away form the reactors, which are under discussion. In the interim storage facilities, the storage using the dry cask of the storage metal cask with business showings, having the function of transportation is now under discussion. By employing transportation and storage dual-purpose cask, the repack equipments can be exhausted, and the reliability of the interim storage installations can be increased. Hitachi, Ltd. has been developing the high reliable and economical transportation and storage dry metal cask. In this report, the outline of our developing transportation and storage dry cask is described. (author)

  13. Success of Two-Stage Reimplantation in Patients Requiring an Interim Spacer Exchange.

    Science.gov (United States)

    George, Jaiben; Miller, Evan M; Curtis, Gannon L; Klika, Alison K; Barsoum, Wael K; Mont, Michael A; Higuera, Carlos A

    2018-03-23

    Some patients undergoing a 2-stage revision for a periprosthetic joint infection require a repeat spacer in the interim (removal of existing spacer with insertion of a new spacer or spacer exchange) due to persistent infection. The objectives of this study are to (1) determine the factors associated with patients who receive a repeat spacer and (2) compare the infection-free survival (overall and stratified by joint type) of reimplantation in patients who did or did not receive a repeat spacer. From 2001 to 2014, 347 hip or knee 2-stage revisions that finally underwent reimplantation and had a minimum 2-year follow-up were identified. An interim spacer exchange was performed in 59 (17%) patients (exchange cohort). Patient-related and organism-related factors were compared between the exchange and non-exchange cohorts. Kaplan-Meier survival curves were performed to assess the success (absence of signs of infection, reoperation for infection, periprosthetic joint infection-related mortality) of both cohorts. Patients in the exchange group had higher comorbidity score (P = .020), prolonged time to reimplantation (P exchange cohort, and 78% (knee 77%, hip 78%) in the non-exchange cohort (P = .020). Patients requiring an interim spacer exchange were found to have more comorbidities, prolonged treatment period, and were more likely to be infected with a resistant organism. About one-third of such patients became reinfected within 5 years compared to only one-fifth of the patients without an interim spacer exchange. Copyright © 2018 Elsevier Inc. All rights reserved.

  14. In-situ active/passive bioreclamation of vadose zone soils contaminated with gasoline and waste oil using soil vapor extraction/bioventing: Laboratory pilot study to full scale site operation

    International Nuclear Information System (INIS)

    Zachary, S.P.; Everett, L.G.

    1993-01-01

    The use of soil venting to supply oxygen and remove metabolites from the biodegradation of light hydrocarbons is a cost effective in-situ remediation approach. To date, little data exists on the effective in-situ bioreclamation of vadose zone soil contaminated with waste/hydraulic oil without excavation or the addition of water or nutrients to degrade the heavy petroleum contaminants. Gasoline and waste/hydraulic oil contaminated soils below an active commercial building required an in-situ non-disruptive remediation approach. Initial soil vapor samples collected from the vadose zone revealed CO 2 concentrations in excess of 16% and O 2 concentrations of less than 1% by volume. Soil samples were collected from below the building within the contaminated vadose zone for laboratory chemical and physical analysis as well as to conduct a laboratory biotreatability study. The laboratory biotreatability study was conducted for 30 days to simulate vadose zone bioventing conditions using soil taken from the contaminated vadose zone. Results of the biotreatability study revealed that the waste oil concentrations had been reduced from 960 mg/Kg to non-detectable concentrations within 30 days and the volatile hydrocarbon content had decreased exponentially to less than 0.1% of the original concentration. Post treatability study biological enumeration revealed an increase in the microbial population of two orders of magnitude

  15. 7 CFR 1710.109 - Reimbursement of general funds and interim financing.

    Science.gov (United States)

    2010-01-01

    ... LOANS AND GUARANTEES Loan Purposes and Basic Policies § 1710.109 Reimbursement of general funds and... replace interim financing used to finance equipment and facilities that were included in an RUS-approved...

  16. Public School Finance Problems in Texas. An Interim Report.

    Science.gov (United States)

    Texas Research League, Austin.

    The U.S. District Court ruling in Rodriguez vs San Antonio Independent School District, which struck down Texas' school finance system as inequitable and unconstitutional, provided the impetus for publishing this interim report. The report documents the growing cost of State-supported public school programs--the primary concern prior to the…

  17. Interim supply in the electricity industry

    Energy Technology Data Exchange (ETDEWEB)

    Strassburg, W

    1977-06-01

    The interim supply or the so-called 'condition without a contract' can occur within the framework of energy supply in the relationship between 1) public utility and tariff customer, 2) public utility and the special last-in-line consumer, 3) supplying and distributing public utility, 4) public utility and territorial administrative body. The present contribution deals with the cases named under (3) and (4). Cases (1) and (2) were dealt with in a previous article. Relevant contract clauses and laws and their effects on contracting partners are discussed.

  18. Interim supply in the electricity industry

    Energy Technology Data Exchange (ETDEWEB)

    Strassburg, W

    1977-05-01

    The interim supply or the so-called 'condition without a contract' can occur within the framework of energy supply in the relationship between: 1) public utility and tariff customer, 2) public utility and the special last-in-line consumer, 3) supplying and distributing public utility, 4) public utility and territorial administrative body. The contribution at hand deals with the cases under 1) and 2); cases 3) and 4) are dealt with in an article to be published. Relevant contract clauses and laws and their effects on contracting partners are discussed. 41 references.

  19. Central waste complex interim safety basis

    International Nuclear Information System (INIS)

    Cain, F.G.

    1995-01-01

    This interim safety basis provides the necessary information to conclude that hazards at the Central Waste Complex are controlled and that current and planned activities at the CWC can be conducted safely. CWC is a multi-facility complex within the Solid Waste Management Complex that receives and stores most of the solid wastes generated and received at the Hanford Site. The solid wastes that will be handled at CWC include both currently stored and newly generated low-level waste, low-level mixed waste, contact-handled transuranic, and contact-handled TRU mixed waste

  20. 33 CFR 96.360 - Interim Safety Management Certificate: what is it and when can it be used?

    Science.gov (United States)

    2010-07-01

    ...? § 96.360 Interim Safety Management Certificate: what is it and when can it be used? (a) A responsible... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Interim Safety Management Certificate: what is it and when can it be used? 96.360 Section 96.360 Navigation and Navigable Waters COAST...

  1. 15 CFR 990.30 - Definitions.

    Science.gov (United States)

    2010-01-01

    ... organized group or community, but not including any Alaska Native regional or village corporation, which is... Availability of Draft Restoration Plans; (iii) Developing and managing administrative records; (iv) Preparing... for interim losses. Natural resources means land, fish, wildlife, biota, air, water, ground water...

  2. Automatic drafting system for lined tanks used for nuclear power plants

    International Nuclear Information System (INIS)

    Sasaki, Ryoichi; Kikuchi, Nobuo

    1981-01-01

    The concrete vessels lined with metallic sheets are used widely in chemical and food industries and nuclear power plants. Especially in nuclear power plants, rectangular lined tanks have been adopted mainly to store radioactive liquid and solid wastes recently, because of the good volume efficiency. Though the basic structure of the lined tanks is the same, the volume and the form change according to the kinds of stored matters and the positions of pipe connections, and the form of individual lining sheets diversifies. As much labor and time are consumed for the drawing, automatic drafting was planned, and the conditions of application were studied. As for the conditions of application, the following metters are conceivable: the standardized method of design of equipments, the handling of figures numerically or by mathematical formulas, troublesome calculation, the works likely to cause mistake, many drawings for production and so on. The lined tanks almost satisfy these conditions, therefore the automatic drafting was promoted, and good results were obtained. the range of application of the automatic drafting system, the standardization of the form of lined tanks, the size of lining sheets, part number and welding number, the composition of the automatic drafting system, the outline of the program, and the effectiveness of automatic drafting are described. (Kako, I.)

  3. 76 FR 10908 - Draft Guidance for Industry on Medication Guides-Distribution Requirements and Inclusion of...

    Science.gov (United States)

    2011-02-28

    ...] Draft Guidance for Industry on Medication Guides--Distribution Requirements and Inclusion of Medication... a draft guidance for industry entitled ``Medication Guides--Distribution Requirements and Inclusion... Inclusion of Medication Guides in Risk Evaluation and Mitigation Strategies (REMS).'' This draft guidance is...

  4. Numerical and Experimental Study on a Model Draft Tube with Vortex Generators

    Directory of Open Access Journals (Sweden)

    Tian Xiaoqing

    2013-01-01

    Full Text Available A model water turbine draft tube containing vortex generators (VG was studied. Numerical simulations were performed to investigate 55 design variations of the vortex generators in a draft tube. After analyzing the shapes of streamlines and velocity distributions in the tube and comparing static pressure recovery coefficients (SPRC in different design variations, an optimum vortex generator layout, which can raise SPRC of the draft tube by 4.8 percent, was found. To verify the effectiveness of the vortex generator application, a series of experiments were carried out. The results show that by choosing optimal vortex generator parameters, such as the installation type, installation position, blade-to-blade distance, and blade inclination angle, the draft tube equipped vortex generators can effectively raise their SPRC andworking stability.

  5. Interim geotechnical data report

    International Nuclear Information System (INIS)

    1986-01-01

    This issue, the Interim Geotechnical Field Data Report, presents information obtained from the geotechnical activities at the WIPP site underground facilities since the last quarterly report. It also includes cumulative plots which contain all previous data. Finally, it continues the geotechnical analyses and interpretations of the data. The GFDR is organized into two principal parts. The first part, Geotechnical Field Data, presents in graphical form all the data collected since April 1982 from the geomechanical instruments. Presented in the second part, Evaluation and Analyses, are preliminary interpretations and analyses of the data. In this report, continuing geotechnical assessment of all the facility features is presented. Also included in the second part are separate sections on evaluation and interpretation of the instrumentation measurements, and an updated description and evaluation of observed behavior of the underground openings

  6. Three draft genomes of Vibrio coralliilyticus strains isolated from bivalve hatcheries

    Science.gov (United States)

    Reported here are the draft genomes of three Vibrio coralliilyticus isolates RE87, AIC-7, and 080116A. Each strain was isolated in association with diseased oyster larvae in commercial aquaculture systems. These draft genomes will be useful for further studies in understanding the genomic features...

  7. Traditional Engineering Graphics versus Computer-Aided Drafting: A View from Academe.

    Science.gov (United States)

    Foster, Robert J.

    1987-01-01

    Argues for a legitimate role of manually expressed engineering graphics within engineering education as a needed support for computer-assisted drafting work. Discusses what and how students should learn as well as trends in engineering graphics education. Compares and contrasts manual and computer drafting methods. (CW)

  8. 77 FR 22247 - Veterinary Feed Directive; Draft Text for Proposed Regulation

    Science.gov (United States)

    2012-04-13

    .... FDA-2010-N-0155] Veterinary Feed Directive; Draft Text for Proposed Regulation AGENCY: Food and Drug... the efficiency of FDA's Veterinary Feed Directive (VFD) program. The Agency is making this draft text..., rm. 1061, Rockville, MD 20852. FOR FURTHER INFORMATION CONTACT: Sharon Benz, Center for Veterinary...

  9. 76 FR 51034 - Availability of Draft NTP Monograph on Potential Developmental Effects of Cancer Chemotherapy...

    Science.gov (United States)

    2011-08-17

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Availability of Draft NTP Monograph on Potential... Meeting To Peer Review Draft Monograph AGENCY: Division of the National Toxicology Program (DNTP...: Availability of Draft Monograph; Request for Comments; Announcement of a Peer Review Panel Meeting. SUMMARY...

  10. 2005 Annual Operations Report for INTEC Operable Unit 3-13, Group 1, Tank Farm Interim Action

    International Nuclear Information System (INIS)

    D. Shanklin

    2006-01-01

    This annual operations report describes the requirements followed and activities conducted to inspect, monitor, and maintain the items installed during performance of the Waste Area Group 3, Operable Unit 3-13, Group 1, Tank Farm Interim Action, at the Idaho Nuclear Technology and Engineering Center. This report describes inspection and monitoring activities for the surface-sealed areas within the tank farm, concrete-lined ditches and culverts in and around the tank farm, the lift station, and the lined evaporation pond. These activities are intended to assure that the interim action is functioning adequately to meet the objectives stated in the Operable Unit 3-13, Record of Decision for the Group 1, Tank Farm Interim Action, (DOE/ID-10660) and as amended by the agreement to resolve dispute, which was effective in February 2003

  11. Interim Stabilization Equipment Essential and Support Drawing Plan

    International Nuclear Information System (INIS)

    KOCH, M.R.

    1999-01-01

    The purpose of this document is to list the Interim Stabilization equipment drawings that are classified as Essential or Support drawings. Essential Drawings: Those drawings identified by the facility staff as necessary to directly support the safe operation of the facility or equipment. Support Drawings: Those drawings identified by the facility staff that further describe the design details of structures, systems or components shown on essential drawings

  12. Effectiveness Monitoring Report, MWMF Tritium Phytoremediation Interim Measures.

    Energy Technology Data Exchange (ETDEWEB)

    Hitchcock, Dan; Blake, John, I.

    2003-02-10

    This report describes and presents the results of monitoring activities during irrigation operations for the calendar year 2001 of the MWMF Interim Measures Tritium Phytoremediation Project. The purpose of this effectiveness monitoring report is to provide the information on instrument performance, analysis of CY2001 measurements, and critical relationships needed to manage irrigation operations, estimate efficiency and validate the water and tritium balance model.

  13. 76 FR 22721 - Notice of Availability of Draft Resource Management Plans and Associated Environmental Impact...

    Science.gov (United States)

    2011-04-22

    ...] Notice of Availability of Draft Resource Management Plans and Associated Environmental Impact Statement for the Bighorn Basin Resource Management Plan Revision Project, Cody and Worland Field Offices... Draft Resource Management Plan (RMP) for the Cody Field Office, a Draft RMP for the Worland Field Office...

  14. Preliminary application of the draft code case for alloy 617 for a high temperature component

    International Nuclear Information System (INIS)

    Lee, Hyeong Yeon; Kim, Yong Wan; Song, Kee Nam

    2008-01-01

    The ASME draft Code Case for Alloy 617 was developed in the late 1980s for the design of very-high-temperature gas cooled reactors. The draft Code Case was patterned after the ASME Code Section III Subsection NH and was intended to cover Ni-Cr-Co-Mo Alloy 617 to 982 .deg. C (1800 .deg. F). But the draft Code Case is still in an incomplete status, lacking necessary material properties and design data. In this study, a preliminary evaluation on the creep-fatigue damage for a high temperature hot duct pipe structure has been carried out according to the draft Code Case. The evaluation procedures and results according to the draft Code Case for Alloy 617 material were compared with those of the ASME Subsection NH and RCC-MR for Alloy 800H material. It was shown that many data including material properties, fatigue and creep data should be supplemented for the draft Code Case. However, when the evaluation results on the creep-fatigue damage according to the draft Code Case, ASME-NH and RCC-MR were compared based on the preliminary evaluation, it was shown that the Alloy 617 results from the draft Code Case tended to be more resistant to the creep damage while less resistant to the fatigue damage than those from the ASME-NH and RCC-MR

  15. Environmental survey of two interim dumpsites, Middle Atlantic Bight from 05 November 1973 to 10 November 1973 (NODC Accession 7501280)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — A second oceanographic survey cruise was made to an interim municipal sludge dumpsite and initially to an interim dumpsite for the disposal of industrial acid waste...

  16. 78 FR 49318 - Availability of Draft Advisory Circular (AC) 90-106A and AC 20-167A

    Science.gov (United States)

    2013-08-13

    ...] Availability of Draft Advisory Circular (AC) 90-106A and AC 20- 167A AGENCY: Federal Aviation Administration... of draft Advisory Circular (AC) 90-106A, Enhanced Flight Vision Systems and draft AC 20- 167A... Federal holidays. FOR FURTHER INFORMATION CONTACT: For technical questions concerning draft AC 90-106A...

  17. Final hazard classification and auditable safety analysis for the 105-C Reactor Interim Safe Storage Project

    International Nuclear Information System (INIS)

    Rodovsky, T.J.; Larson, A.R.; Dexheimer, D.

    1996-12-01

    This document summarizes the inventories of radioactive and hazardous materials present in the 105-C Reactor Facility and the operations associated with the Interim Safe Storage Project which includes decontamination and demolition and interim safe storage of the remaining facility. This document also establishes a final hazard classification and verifies that appropriate and adequate safety functions and controls are in place to reduce or mitigate the risk associated with those operations

  18. Re: “Comments on draft rules for granting Foreign Tax Credit”

    NARCIS (Netherlands)

    Sanghavi, Dhruv

    2016-01-01

    This letter to the Indian Ministry of Finance critically reviews the proposed rules for the grant of credit in India for taxes paid in a foreign country (Draft Rules). It points out what is perhaps the most egregious drawback in the Draft Rules - they do not consider the erosive impact foreign

  19. 75 FR 29724 - Gulf of Mexico Fishery Management Council; Public Meetings

    Science.gov (United States)

    2010-05-27

    ..., 2203 North Lois Avenue, Suite 1100, Tampa, FL 33607. FOR FURTHER INFORMATION CONTACT: Dr. Stephen... Committee and full council will appoint three participants to the National Scientific and Statistical... Statistical Committee; considerations for a request for an Interim Rule for Gag; draft framework amendment to...

  20. Surface Water Interim Measures/Interim Remedial Action Plan/ Environmental and Decision Document, South Walnut Creek Basin, Operable Unit No.2

    International Nuclear Information System (INIS)

    1991-01-01

    Water quality investigations have identified the presence of volatile organic compound (VOC) and radionuclide contamination of surface water at the Rocky Flats Plant (RFP). The subject interim Measures/Interim Remedial Action Plan/Environmental Assessment (IM/IRAP/EA) addresses contaminated surface water in a portion of the South Walnut Creek drainage basin located within an area identified as Operable Unit No. 2 (OU 2). There is no immediate threat to public health and the environment posed by this surface water contamination. The affected surface water is contained within the plant boundary by existing detention ponds, and is treated prior to discharge for removal of volatile contaminants and suspended particulates to which radionuclides, if present, are likely to absorb. However, there is a potential threat and the Department of Energy (DOE) is implementing this Surface Water IM/IRAP at the request of the US Environmental Protection Agency (EPA) and Colorado Department of Health (CDH). Implementation of the Surface Water IM/IRA will enhance the DOE's efforts towards containing and managing contaminated surface water, and will mitigate downgradient migration of contaminants. Another factor in implementing this IM/IRA is the length of time it will take to complete the investigations and engineering studies necessary to determine the final remedy for OU 2. 44 refs., 23 figs., 14 tabs

  1. IRIS Toxicological Review of Ethyl Tertiary Butyl Ether (ETBE) (Public Comment Draft)

    Science.gov (United States)

    In September 2016, the U.S. Environmental Protection Agency's (USEPA) released the draft Integrated Risk Information System (IRIS) Toxicological Review of Ethyl Tertiary Butyl Ether (ETBE). Consistent with the 2013 IRIS Enhancements, draft IRIS assessments are released prior to e...

  2. AGILE DRAFTING OF OUTSOURCING CONTRACTS

    DEFF Research Database (Denmark)

    Schlichter, Bjarne Rerup; Storgaard, Kristian

    2015-01-01

    and in several parallel tracks using different competencies. By the use of an illustrative case-study, this paper explores how scrum can be applied to enhance the process of drafting outsourcing contracts. The analysis indicates that the use of an agile method, such as Scrum, can be beneficial in this context...

  3. Shape optimization of draft tubes for Agnew microhydro turbines

    International Nuclear Information System (INIS)

    Shojaeefard, Mohammad Hasan; Mirzaei, Ammar; Babaei, Ali

    2014-01-01

    Highlights: • The draft tube of Agnew microhydro turbine was optimized. • Pareto optimal solutions were determined by neural networks and NSGA-II algorithm. • The pressure recovery factor increases with height and angle over design ranges. • The loss coefficient reaches the minimum values at angles about 2 o . • Swirl of the incoming flow has great influence on the optimization results. - Abstract: In this study, the shape optimization of draft tubes utilized in Agnew type microhydro turbines has been discussed. The design parameters of the draft tube such as the cone angle and the height above the tailrace are considered in defining an optimization problem whose goal is to maximize the pressure recovery factor and minimize the energy loss coefficient of flow. The design space is determined by considering the experimental constraints and parameterized by the method of face-centered uniform ascertain distribution. The numerical simulations are performed using the boundary conditions found from laboratory tests and the obtained results are analyzed to create and validate a feed-forward neural network model, which is implemented as a surrogate model. The optimal Pareto solutions are finally determined using the NSGA-II evolutionary algorithm and compared for different inlet conditions. The results predict that the high swirl of the incoming flow drastically reduces the performance of the draft tube

  4. Early rehabilitation of facial defects using interim removable prostheses: A clinical case report

    Directory of Open Access Journals (Sweden)

    Vivekanandhan Ramkumar

    2013-01-01

    Full Text Available Surgical resection of neoplasms or malformations of the face may result in defects that are not amenable to immediate surgical reconstruction. Such defects can have a severe adverse effect on patient perceptions of body image and self-esteem. In these cases, the use of an interim removable facial prosthesis can offer a rapid alternative treatment solution. The patient may then resume social interactions more comfortably while permitting easy access to the facial defect to observe tissue healing while awaiting definitive rehabilitation. This article presents a case report describing the use of interim nasal prostheses to provide rapid patient rehabilitation of facial defects.

  5. Lessons learned from the Siting Process of an Interim Storage Facility in Spain - 12024

    Energy Technology Data Exchange (ETDEWEB)

    Lamolla, Meritxell Martell [MERIENCE Strategic Thinking, 08734 Olerdola, Barcelona (Spain)

    2012-07-01

    On 29 December 2009, the Spanish government launched a site selection process to host a centralised interim storage facility for spent fuel and high-level radioactive waste. It was an unprecedented call for voluntarism among Spanish municipalities to site a controversial facility. Two nuclear municipalities, amongst a total of thirteen municipalities from five different regions, presented their candidatures to host the facility in their territories. For two years the government did not make a decision. Only in November 30, 2011, the new government elected on 20 November 2011 officially selected a non-nuclear municipality, Villar de Canas, for hosting this facility. This paper focuses on analysing the factors facilitating and hindering the siting of controversial facilities, in particular the interim storage facility in Spain. It demonstrates that involving all stakeholders in the decision-making process should not be underestimated. In the case of Spain, all regional governments where there were candidate municipalities willing to host the centralised interim storage facility, publicly opposed to the siting of the facility. (author)

  6. System Specification for Immobilized High-Level Waste Interim Storage

    International Nuclear Information System (INIS)

    CALMUS, R.B.

    2000-01-01

    This specification establishes the system-level functional, performance, design, interface, and test requirements for Phase 1 of the IHLW Interim Storage System, located at the Hanford Site in Washington State. The IHLW canisters will be produced at the Hanford Site by a Selected DOE contractor. Subsequent to storage the canisters will be shipped to a federal geologic repository

  7. First Draft of the Research Agenda

    DEFF Research Database (Denmark)

    Dahl, Hanne Marlene; Pieper, Michael; Fahnøe, Kristian

    This report is a draft of a research agenda that the consortium INNOSERV has provided to the European Commission. It is the result of the work of researchers and insights provided by users, practitioners, experts and policy-makers involving around 20 examples of innovative practices from different...... and provide one of several sources of input from social platforms for HORISON 2020. INNOSERV is a social platform consisting of experts from various EU countries and key stakeholders and is itself an innovation in how researchers work together with representatives from various parts of society, thereby...... ensuring the relevance of the suggested draft of a research agenda. The seven themes identified are: User-centeredness innovation in social services, Innovation in institutional development, Framing of social services in relation to innovation, The governance of innovation, Influence of regional and local...

  8. Evaluation of Hose in Hose Transfer Line Service Life for Hanfords Interim Stabilization Program

    International Nuclear Information System (INIS)

    TORRES, T.D.

    2001-01-01

    RPP-6153, Engineering Task Plan for Hose-in-Hose Transfer System for the Interim Stabilization Program (Torres, 2000a), defines the programmatic goals, functional requirements, and technical criteria for the development and subsequent installation of waste transfer line equipment to support Hanford's Interim Stabilization Program. RPP-6028, Specification for Hose in Hose Transfer Lines for Hanford's Interim Stabilization Program (Torres, 2000b), has been issued to define the specific requirements for the design, manufacture, and verification of transfer line assemblies for specific waste transfer applications associated with Interim Stabilization. Included in RPP-6028 are tables defining the chemical constituents of concern to which transfer lines will be exposed. Current Interim Stabilization Program planning forecasts that the at-grade transfer lines will be required to convey pumpable waste for as much as three years after commissioning, RPP-6028 Section 3.2.7. Performance Incentive Number ORP-05 requires that all the Single Shell Tanks be Interim Stabilized by September 30, 2003. The Tri-Party Agreement (TPA) milestone M-41-00, enforced by a federal consent decree, requires all the Single Shell Tanks to be Interim stabilized by September 30, 2004. By meeting the Performance Incentive the TPA milestone is met. Prudent engineering dictates that the equipment used to transfer waste have a life in excess of the forecasted operational time period, with some margin to allow for future adjustments to the planned schedule. This document evaluates the effective service life of the Hose-in-Hose Transfer Lines, based on information submitted by the manufacturer, published literature and calculations. The effective service life of transfer line assemblies is a function of several factors. Foremost among these are the hose material's resistance to the harmful effects of process fluid characteristics, ambient environmental conditions, exposure to ionizing radiation and the

  9. Interim safety basis compliance matrix for Trenches 31 and 34

    International Nuclear Information System (INIS)

    Ames, R.R.

    1994-01-01

    The tables provided in this document identify the specific requirements and basis for the administrative controls established in the Westinghouse Hanford Company (WHC) Solid Waste Burial Ground (SWBG) Interim Safety Basis (ISB) for operation of the Project W-025, Mixed Waste Lined Landfill (Trenches 31 and 34). The tables document the necessary controls and implementing procedures to ensure compliance with the requirements of the ISB. These requirements provide a basis for future Unreviewed Safety Questions (USQ) screening of applicable procedure changes, proposed physical modifications, tests, experiments, and occurrences. Table 1 provides the SWBG interim Operational Safety Requirements administrative controls matrix. The specific assumptions and commitments used in the safety analysis documents applicable to disposal of mixed wastes in Trenches 31 and 34 are provided in Table 2. Table 3 is provided to document the potential engineered and administrative mitigating features identified in the Preliminary Hazard Analysis (PHA) for disposal of mixed waste

  10. 77 FR 46986 - Revisions to Electric Quarterly Report Filing Process; Availability of Draft XML Schema

    Science.gov (United States)

    2012-08-07

    ... Supplementary Information Section below for details. DATES: The draft XML Schema is now available at the links...] Revisions to Electric Quarterly Report Filing Process; Availability of Draft XML Schema AGENCY: Federal... Regulatory Commission is making available on its Web site ( http://www.ferc.gov ) a draft of the XML schema...

  11. 75 FR 49913 - Draft Guidance, “Federal Greenhouse Gas Accounting and Reporting”

    Science.gov (United States)

    2010-08-16

    ... provides this draft guidance for public review and comment to ensure accessibility of Federal accounting... COUNCIL ON ENVIRONMENTAL QUALITY Draft Guidance, ``Federal Greenhouse Gas Accounting and Reporting... recommended Federal GHG reporting and accounting procedures. On April 5, 2010, DOE-FEMP submitted the final...

  12. How the University of Texas system responded to the need for interim storage of low-level radioactive waste materials.

    Science.gov (United States)

    Emery, Robert J

    2012-11-01

    Faced with the prospect of being unable to permanently dispose of low-level radioactive wastes (LLRW) generated from teaching, research, and patient care activities, component institutions of the University of Texas System worked collaboratively to create a dedicated interim storage facility to be used until a permanent disposal facility became available. Located in a remote section of West Texas, the University of Texas System Interim Storage Facility (UTSISF) was licensed and put into operation in 1993, and since then has provided safe and secure interim storage for up to 350 drums of dry solid LLRW at any given time. Interim storage capability provided needed relief to component institutions, whose on-site waste facilities could have possibly become overburdened. Experiences gained from the licensing and operation of the site are described, and as a new permanent LLRW disposal facility emerges in Texas, a potential new role for the storage facility as a surge capacity storage site in times of natural disasters and emergencies is also discussed.

  13. Interim reliability evaluation program, Browns Ferry fault trees

    International Nuclear Information System (INIS)

    Stewart, M.E.

    1981-01-01

    An abbreviated fault tree method is used to evaluate and model Browns Ferry systems in the Interim Reliability Evaluation programs, simplifying the recording and displaying of events, yet maintaining the system of identifying faults. The level of investigation is not changed. The analytical thought process inherent in the conventional method is not compromised. But the abbreviated method takes less time, and the fault modes are much more visible

  14. Lummi Bay Marina, Whatcom County, Washington. Draft Detailed Project Report and Draft Environmental Impact Statement.

    Science.gov (United States)

    1983-12-01

    the eastern north Pacific Ocean at s *me season of the year, which are listed as endangered "jnder the Lndangercd Spc ;ici; hcL of 1973, and which...efficient vessel operation. The selection of channel depth was dependent upon the loaded draft of expected vessels, squat or sinkage. trim maneuverability

  15. Repacking of Cobalt 60 spent sources in the central interim storage

    International Nuclear Information System (INIS)

    Zeleznik, N.

    2003-01-01

    After the transfer of the responsibility for the management of the Central interim storage for waste from small producers, located at the reactor centre in Brinje near Ljubljana, Slovenia, the national Agency for radwaste management (ARAO) started with most urgent activities to improve the utilization of the storage facility. One of the main tasks has also been the rearrangement of the already stored radioactive waste in order to reduce volume of the waste and to collect same radioisotopes in the containers. The latest campaign, performed in 2002/2003, was repacking of all Co-60 spent sealed sources in the storage facility and also at the producer's premises which were after conditioning put into two drums with concrete matrix and stored back to the Central interim storage. The preparation works together with the implementation are described in the paper. (author)

  16. 76 FR 55941 - Notice of Availability of the Draft Bakersfield Resource Management Plan and Draft Environmental...

    Science.gov (United States)

    2011-09-09

    ... a telecommunications device for the deaf (TDD) may call the Federal Information Relay Service (FIRS... development and other land use authorizations with resource values; and (6) climate change. The Draft RMP... authorizations, livestock grazing, mineral development and recreation. Bitter Creek (6,121 acres): This newly...

  17. Evaluation of Hose in Hose Transfer Line Service Life for Hanford's Interim Stabilization Program

    International Nuclear Information System (INIS)

    TORRES, T.D.

    2000-01-01

    RPP-6153, Engineering Task Plan for Hose-in-Hose Transfer System for the Interim Stabilization Program, defines the programmatic goals, functional requirements, and technical criteria for the development and subsequent installation of transfer line equipment to support Hanford's Interim Stabilization Program. RPP-6028, Specification for Hose in Hose Transfer Lines for Hanford's Interim Stabilization Program, has been issued to define the specific requirements for the design, manufacture, and verification of transfer line assemblies for specific waste transfer applications. Included in RPP-6028 are tables defining the chemical constituents of concern to which transfer lines will be exposed. Current Interim Stabilization Program planning forecasts that the at-grade transfer lines will be required to convey pumpable waste for as much as three years after commissioning. Prudent engineering dictates that the equipment placed in service have a working life in excess of this forecasted time period, with some margin to allow for future adjustments to the planned schedule. This document evaluates the effective service life of the Hose-in-Hose Transfer Lines, based on information submitted by the manufacturer and published literature. The effective service life of transfer line assemblies is a function of several factors. Foremost among these are process fluid characteristics, ambient environmental conditions, and the manufacturer's stated shelf life. This evaluation examines the manufacturer's certification of shelf life, the manufacturer's certifications of chemical compatibility with waste, and published literature on the effects of exposure to ionizing radiation on the mechanical properties of elastomeric materials to evaluate transfer line service life

  18. 75 FR 78980 - Notice of Availability of the Draft Programmatic Environmental Impact Statement for Solar Energy...

    Science.gov (United States)

    2010-12-17

    ...] Notice of Availability of the Draft Programmatic Environmental Impact Statement for Solar Energy... Draft Programmatic Environmental Impact Statement (EIS) for Solar Energy Development in Six Southwestern... preferred method of commenting. Mail: Addressed to: Solar Energy Draft Programmatic EIS, Argonne National...

  19. 77 FR 56909 - Notice of Comment Period Extension for the Revised Draft Environmental Impact Report/Supplemental...

    Science.gov (United States)

    2012-09-14

    ... for the Revised Draft Environmental Impact Report/Supplemental Draft Environmental Impact Statement... Supplemental Draft Environmental Impact Statement (EIS) for the Fresno to Bakersfield Section of the California... this decision to be responsive to stakeholder requests and to encourage comprehensive public...

  20. Radiation shielding and dose rate evaluation at the interim storage facility for spent fuel from Cernavoda NPP

    International Nuclear Information System (INIS)

    Stanciu, Marcela; Mateescu, Silvia; Pantazi, Doina; Penescu, Maria

    2000-01-01

    At present studies necessary to license the Interim Storage Facility for the Spent Fuel (CANDU type) from Cernavoda NPP are developed in our country.The spent fuel from Cernavoda NPP is discharged into Spent Fuel Bay in Service Building of the plant, where it remains several years for cooling. After this period, the bundles of spent fuel are to be transferred to the Interim Storage Facility.The dry interim storage solution seems to be the most appropriate variant for Cernavoda NPP.The design of the Spent Fuel Interim Storage Facility must meet the applicable safety requirements in order to ensure radiological protection of the personnel, public and environment during all phases of the facility achievement. In this paper we intend to present the calculation of radiation shielding at the spent fuel interim storage facility for two technical solutions: - Concrete Monolithic Module and Concrete Storage Cask. In order to quantify the fuel composition after irradiation, the isotope generation and depletion code ORIGEN 2.1 has been used, taking into account a cooling time of 7 years and 9 years, respectively, for these two variants. The shielding calculations have been performed using the computer codes QAD-5K and MICROSHIELD-4. The evaluations refer only to gamma radiation because the resulting neutron source (from (α,n) reactions and spontaneous fission) is insignificant as compared to the gamma source. The final results consist in the minimum thickness of the shielding and the corresponding external dose rates, ensuring a design average dose rate based on national and international regulations. (authors)

  1. Interim report on assessment of cable aging for nuclear power plants

    International Nuclear Information System (INIS)

    2006-12-01

    Research on assessment of cable aging for nuclear power plants (NPPs) started in 2002 in order to obtain data of safety-related cables affected by thermal aging, simultaneous thermal and radiation aging, and Loss-of-Coolant Accident (LOCA) equivalent test, which could contribute to draft guideline on comprehensive assessment of cable aging for NPPs while taking into consideration the latest knowledge. For the cable aging test, cross-linked polyethylene, flame-retardant cross-linked polyethylene, ethylene propylene rubber, flame-retardant ethylene propylene rubber, silicone rubber and special heat-resistant polyvinyl chloride insulators were selected from the safety-related cables used in the nuclear power plants. Furthermore, 2 to 3 kinds of cables with insulators of different manufacturers were added making a total of 14 kinds of cable specimens for the test. Aging period was selected as a basic parameter while three temperature conditions for thermal aging specimen and combined nine conditions of three temperatures with three dose rates for simultaneous aging specimens. Degradation of cable aging was characterized by elongation at break of tensile test. LOCA test for 9 kinds of cables was also conducted using the simultaneous aging specimens. Furthermore, the investigation of applicability of non-destructive degradation diagnostic technologies for aged cables was conducted to confirm the validity of cable aging evaluation at actual operating plants. Interim report was issued in 2006 and based on cable aging test until 21,000 hrs maximum; 1) a significant difference might be observed at times in the aging progress depending on the insulator manufacturer even if the insulator type was identical, 2) activation energy values calculated from the thermal aging test data were smaller than those currently used and principles of calculation and application of the activation energy were developed for evaluation and 3) superposition of time dependent data was applicable to

  2. Immobilized High-Level Waste (HLW) Interim Storage Alternative Generation and analysis and Decision Report - second Generation Implementing Architecture

    International Nuclear Information System (INIS)

    CALMUS, R.B.

    2000-01-01

    Two alternative approaches were previously identified to provide second-generation interim storage of Immobilized High-Level Waste (IHLW). One approach was retrofit modification of the Fuel and Materials Examination Facility (FMEF) to accommodate IHLW. The results of the evaluation of the FMEF as the second-generation IHLW interim storage facility and subsequent decision process are provided in this document

  3. In-situ storage: An approach to interim remedial action - recent case studies in Canada

    International Nuclear Information System (INIS)

    Zelmer, R.L.

    1991-01-01

    The Low-Level Radioactive Waste Management Office (LLRWMO) acts on behalf of the federal government to manage historic low-level radioactive wastes. Recent interim remedial work in the Town of Port Hope, Ontario has included the consolidation of radium and uranium contaminated soils into temporary storage facilities on two sites to await final disposal elsewhere. Simple containments constructed and sited on already contaminated sites have been found effective as part of an interim remedial strategy. The approach has been accepted and supported by the local public. Lessons have been learned from a project management, environmental remediation and engineering design point of view

  4. 76 FR 7817 - Announcing Draft Federal Information Processing Standard 180-4, Secure Hash Standard, and Request...

    Science.gov (United States)

    2011-02-11

    ...-02] Announcing Draft Federal Information Processing Standard 180-4, Secure Hash Standard, and Request... and request for comments. SUMMARY: This notice announces the Draft Federal Information Processing..., Information Technology Laboratory, Attention: Comments on Draft FIPS 180-4, 100 Bureau Drive--Stop 8930...

  5. Extensive error in the number of genes inferred from draft genome assemblies.

    Directory of Open Access Journals (Sweden)

    James F Denton

    2014-12-01

    Full Text Available Current sequencing methods produce large amounts of data, but genome assemblies based on these data are often woefully incomplete. These incomplete and error-filled assemblies result in many annotation errors, especially in the number of genes present in a genome. In this paper we investigate the magnitude of the problem, both in terms of total gene number and the number of copies of genes in specific families. To do this, we compare multiple draft assemblies against higher-quality versions of the same genomes, using several new assemblies of the chicken genome based on both traditional and next-generation sequencing technologies, as well as published draft assemblies of chimpanzee. We find that upwards of 40% of all gene families are inferred to have the wrong number of genes in draft assemblies, and that these incorrect assemblies both add and subtract genes. Using simulated genome assemblies of Drosophila melanogaster, we find that the major cause of increased gene numbers in draft genomes is the fragmentation of genes onto multiple individual contigs. Finally, we demonstrate the usefulness of RNA-Seq in improving the gene annotation of draft assemblies, largely by connecting genes that have been fragmented in the assembly process.

  6. 48 CFR 28.204-2 - Certified or cashiers checks, bank drafts, money orders, or currency.

    Science.gov (United States)

    2010-10-01

    ... checks, bank drafts, money orders, or currency. 28.204-2 Section 28.204-2 Federal Acquisition Regulations... Other Security for Bonds 28.204-2 Certified or cashiers checks, bank drafts, money orders, or currency... draft, Post Office money order, or currency, in an amount equal to the penal sum of the bond, instead of...

  7. Conceptual design report for regional low-level waste interim storage site

    International Nuclear Information System (INIS)

    Bird, M.V.; Thompson, J.D.

    1981-08-01

    An interim storage site design concept was developed for receiving 100,000 ft 3 low-level waste per year, in the form of solidified wastes in 55-gallon drums with a dose rate of < 200 mrem per hour at contact

  8. Numerical Investigation of the Flow Structure in a Kaplan Draft Tube at Part Load

    Science.gov (United States)

    Maddahian, R.; Cervantes, M. J.; Sotoudeh, N.

    2016-11-01

    This research presents numerical simulation of the unsteady flow field inside the draft tube of a Kaplan turbine at part load condition. Due to curvature of streamlines, the ordinary two-equations turbulence models fail to predict the flow features. Therefore, a modification of the Shear Stress Transport (SST-SAS) model is utilized to approximate the turbulent stresses. A guide vane, complete runner and draft tube are considered to insure the real boundary conditions at the draft tube inlet. The outlet boundary is assumed to discharge into the atmosphere. The obtained pressure fluctuations inside the draft tube are in good agreement with available experimental data. In order to further investigate the RVR formation and its movement, the λ2 criterion, relating the position of the vortex core and strength to the second largest Eigen value of the velocity gradient tensor, is employed. The method used for vortex identification shows the flow structure and vortex motion inside the draft tube accurately.

  9. Anomalous Hydrodynamic Drafting of Interacting Flapping Flags

    Science.gov (United States)

    Ristroph, Leif; Zhang, Jun

    2008-11-01

    In aggregates of objects moving through a fluid, bodies downstream of a leader generally experience reduced drag force. This conventional drafting holds for objects of fixed shape, but interactions of deformable bodies in a flow are poorly understood, as in schools of fish. In our experiments on “schooling” flapping flags, we find that it is the leader of a group who enjoys a significant drag reduction (of up to 50%), while the downstream flag suffers a drag increase. This counterintuitive inverted drag relationship is rationalized by dissecting the mutual influence of shape and flow in determining drag. Inverted drafting has never been observed with rigid bodies, apparently due to the inability to deform in response to the altered flow field of neighbors.

  10. Draft Title V Operating Permit: Andeavor Field Services, LLC - Walker Hollow Compressor Station

    Science.gov (United States)

    Draft Title V Operating Permit, statement of basis, public notice bulletin, and the administrative permit docket (application and other supporting documents) for the Draft Part 71 Permit for Andeavor Field Services, LLC - Walker Hollow CS.

  11. 76 FR 57759 - Notice of Availability of Draft Resource Management Plan and Draft Environmental Impact Statement...

    Science.gov (United States)

    2011-09-16

    ... federally-owned subsurface mineral estate. The Colorado River Valley Field Office and the KFO were... Office, Colorado AGENCY: Bureau of Land Management, Interior. ACTION: Notice of availability. SUMMARY: In... Avenue, Kremmling, Colorado 80459. Copies of the Kremmling Draft RMP/EIS are available in the KFO at the...

  12. Interim Design Report

    CERN Document Server

    Choubey, S.; Goswami, S.; Berg, J.S.; Fernow, R.; Gallardo, J.C.; Gupta, R.; Kirk, H.; Simos, N.; Souchlas, N.; Ellis, M.; Kyberd, P.; Benedetto, E.; Fernandez-Martinez, E.; Efthymiopoulos, I.; Garoby, R.; Gilardoni, S.; Martini, M.; Prior, G.; Ballett, P.; Pascoli, S.; Bross, A.; Geer, S.; Johnstone, C.; Kopp, J.; Mokhov, N.; Morfin, J.; Neuffer, D.; Parke, S.; Popovic, M.; Strait, J.; Striganov, S.; Blondel, A.; Dufour, F.; Laing, A.; Soler, F.J.P; Lindner, M.; Schwetz, T.; Alekou, A.; Apollonio, M.; Aslaninejad, M.; Bontoiu, C.; Dornan, P.; Eccleston, R.; Kurup, A.; Long, K.; Pasternak, J.; Pozimski, J.; Bogacz, A.; Morozov, V.; Roblin, Y.; Bhattacharya, S.; Majumdar, D.; Mori, Y.; Planche, T.; Zisman, M.; Cline, D.; Stratakis, D.; Ding, X.; Coloma, P.; Donini, A.; Gavela, B.; Lopez Pavon, J.; Maltoni, M.; Bromberg, C.; Bonesini, M.; Hart, T.; Kudenko, Y.; Mondal, N.; Antusch, S.; Blennow, M.; Ota, T.; Abrams, R.J.; Ankenbrandt, C.M.; Beard, K.B.; Cummings, M.A.C.; Flanagan, G.; Johnson, R.P.; Roberts, T.J.; Yoshikawa, C.Y.; Migliozzi, P.; Palladino, V.; de Gouvea, A.; Graves, V.B.; Kuno, Y.; Peltoniemi, J.; Blackmore, V.; Cobb, J.; Witte, H.; Mezzetto, M.; Rigolin, S.; McDonald, K.T.; Coney, L.; Hanson, G.; Snopok, P.; Tortora, L.; Andreopoulos, C.; Bennett, J.R.J.; Brooks, S.; Caretta, O.; Davenne, T.; Densham, C.; Edgecock, R.; Kelliher, D.; Loveridge, P.; McFarland, A.; Machida, S.; Prior, C.; Rees, G.; Rogers, C.; Thomason, J.W.G.; Booth, C.; Skoro, G.; Karadzhov, Y.; Matev, R.; Tsenov, R.; Samulyak, R.; Mishra, S.R.; Petti, R.; Dracos, M.; Yasuda, O.; Agarwalla, S.K.; Cervera-Villanueva, A.; Gomez-Cadenas, J.J.; Hernandez, P.; Li, T.; Martin-Albo, J.; Huber, P.; Back, J.; Barker, G.; Harrison, P.; Meloni, D.; Tang, J.; Winter, W.

    2011-01-01

    The International Design Study for the Neutrino Factory (the IDS-NF) was established by the community at the ninth "International Workshop on Neutrino Factories, super-beams, and beta- beams" which was held in Okayama in August 2007. The IDS-NF mandate is to deliver the Reference Design Report (RDR) for the facility on the timescale of 2012/13. In addition, the mandate for the study [3] requires an Interim Design Report to be delivered midway through the project as a step on the way to the RDR. This document, the IDR, has two functions: it marks the point in the IDS-NF at which the emphasis turns to the engineering studies required to deliver the RDR and it documents baseline concepts for the accelerator complex, the neutrino detectors, and the instrumentation systems. The IDS-NF is, in essence, a site-independent study. Example sites, CERN, FNAL, and RAL, have been identified to allow site-specific issues to be addressed in the cost analysis that will be presented in the RDR. The choice of example sites shou...

  13. Safety of interim storage solutions of used nuclear fuel during extended term

    Energy Technology Data Exchange (ETDEWEB)

    Shelton, C.; Bader, S.; Issard, H.; Arslan, M. [AREVA, 7135 Minstrel Way, Suite 300 Columbia, MD 21045 (United States)

    2013-07-01

    In 2013, the total amount of stored used nuclear fuel (UNF) in the world will reach 225,000 T HM. The UNF inventory in wet storage will take up over 80% of the available total spent fuel pool (SFP) capacity. Interim storage solutions are needed. They give flexibility to the nuclear operators and ensure that nuclear reactors continue to operate. However, we need to keep in mind that they are also an easy way to differ final decision and implementation of a UNF management approach (recycling or final disposal). In term of public perception, they can have a negative impact overtime as it may appear that nuclear industry may have significant issues to resolve. In countries lacking an integrated UNF management approach, the UNF are being discharged from the SFPs to interim storage (mostly to dry storage) at the same rate as UNF is being discharged from reactors, as the SFPs at the reactor sites are becoming full. This is now the case in USA, Taiwan, Switzerland, Spain, South Africa and Germany. For interim storage, AREVA has developed different solutions in order to allow the continued operation of reactors while meeting the current requirements of Safety Authorities: -) Dry storage canisters on pads, -) Dual-purpose casks (dry storage and transportation), -) Vault dry storage, and -) Centralized pool storage.

  14. 78 FR 15894 - Draft Qualitative Risk Assessment of Risk of Activity/Food Combinations for Activities (Outside...

    Science.gov (United States)

    2013-03-13

    .... FDA-2012-N-1258] Draft Qualitative Risk Assessment of Risk of Activity/Food Combinations for... comment period for a document entitled ``Draft Qualitative Risk Assessment of Risk of Activity/ [[Page... ``Draft Qualitative Risk Assessment of Risk of Activity/Food Combinations for Activities (Outside the Farm...

  15. 78 FR 50088 - Notice of Availability of the Northwest Colorado Greater Sage-Grouse Draft Resource Management...

    Science.gov (United States)

    2013-08-16

    ... Availability of the Northwest Colorado Greater Sage- Grouse Draft Resource Management Plan Amendment and Draft... Land Management (BLM) has prepared a Northwest Colorado Greater Sage-Grouse Draft Resource Management.../or mailings. ADDRESSES: You may submit comments related to the Northwest Colorado Greater Sage-Grouse...

  16. 2006 Annual Operations Report for INTEC Operable Unit 3-13, Group 1, Tank Farm Interim Action

    International Nuclear Information System (INIS)

    D. E. Shanklin

    2007-01-01

    This annual operations report describes the requirements followed and activities conducted to inspect, monitor, and maintain the items installed during performance of the Waste Area Group 3, Operable Unit 3-13, Group 1, Tank Farm Interim Action, at the Idaho Nuclear Technology and Engineering Center. This report covers the time period from January 1 through December 31, 2006, and describes inspection and monitoring activities for the surface-sealed areas within the tank farm, concrete-lined ditches and culverts in and around the tank farm, the lift station, and the lined evaporation pond. These activities are intended to assure that the interim action is functioning adequately to meet the objectives stated in the Operable Unit 3-13, Record of Decision for the Group 1, Tank Farm Interim Action (DOE/ID-10660) as described in the Group 1 Remedial Design/Remedial Action Work Plan (DOE/ID-10772)

  17. Interim FEP report for the safety assessment SR-Can

    Energy Technology Data Exchange (ETDEWEB)

    Skagius, Kristina (ed.) [Kemakta Konsult AB, Stockholm (Sweden)

    2004-08-01

    This report describes the work with identification and structuring of features, events and processes (FEPs) that has been carried out within the scope of the SR-Can safety assessment up to the time of the interim reporting of the project. The overall objective of the work is to develop a database of features, events and processes in a format that would facilitate both a systematic analysis of FEPs and documentation of the FEP analysis as well as facilitate revisions and updates to be made in connection with new safety assessments. This overall objective also includes the development of procedures for a systematic FEP analysis as well as to apply these procedures in order to arrive at an SR-Can version of the FEP database. The work started by implementing the content of the SR 97 Process report into a database format suitable for import and processing of FEP information from other sources. The SR 97 version of the database was systematically audited against the NEA database with Project FEPs, version 1.2. In addition, an earlier audit of the SR 97 process report against the interaction matrices developed for a deep repository of the KBS-3 type was revisited and updated. Relevant FEPs from the audit were sorted into three main categories in the SR-Can database i) FEPs related to the initial states of the repository system, ii) FEPs related to internal processes of the repository system, and iii) FEPs related to external impacts on the repository system. These groups of FEPs were further processed for making decisions on how to handle these FEPs in the assessment. Biosphere processes were not included in the SR 97 Process report and there is thus not the same basis for updating these descriptions as for the engineered barriers and the geosphere. All biosphere FEPs from the audit have therefore been compiled in a single category in the database, but remain to be further handled. FEPs were also categorised as irrelevant or as being related to methodology on a general

  18. Interim FEP report for the safety assessment SR-Can

    International Nuclear Information System (INIS)

    Skagius, Kristina

    2004-08-01

    This report describes the work with identification and structuring of features, events and processes (FEPs) that has been carried out within the scope of the SR-Can safety assessment up to the time of the interim reporting of the project. The overall objective of the work is to develop a database of features, events and processes in a format that would facilitate both a systematic analysis of FEPs and documentation of the FEP analysis as well as facilitate revisions and updates to be made in connection with new safety assessments. This overall objective also includes the development of procedures for a systematic FEP analysis as well as to apply these procedures in order to arrive at an SR-Can version of the FEP database. The work started by implementing the content of the SR 97 Process report into a database format suitable for import and processing of FEP information from other sources. The SR 97 version of the database was systematically audited against the NEA database with Project FEPs, version 1.2. In addition, an earlier audit of the SR 97 process report against the interaction matrices developed for a deep repository of the KBS-3 type was revisited and updated. Relevant FEPs from the audit were sorted into three main categories in the SR-Can database i) FEPs related to the initial states of the repository system, ii) FEPs related to internal processes of the repository system, and iii) FEPs related to external impacts on the repository system. These groups of FEPs were further processed for making decisions on how to handle these FEPs in the assessment. Biosphere processes were not included in the SR 97 Process report and there is thus not the same basis for updating these descriptions as for the engineered barriers and the geosphere. All biosphere FEPs from the audit have therefore been compiled in a single category in the database, but remain to be further handled. FEPs were also categorised as irrelevant or as being related to methodology on a general

  19. 75 FR 27579 - Bison Brucellosis Remote Vaccination, Draft Environmental Impact Statement, Yellowstone National...

    Science.gov (United States)

    2010-05-17

    ... DEPARTMENT OF THE INTERIOR National Park Service Bison Brucellosis Remote Vaccination, Draft... Brucellosis Remote Vaccination Program, Yellowstone National Park. SUMMARY: Pursuant to the National... the Bison Brucellosis Remote Vaccination Draft Environmental Impact Statement (EIS) for Yellowstone...

  20. Proposed nuclear weapons nonproliferation policy concerning foreign research reactor spent nuclear fuel: Appendix A, environmental justice analysis. Volume 2

    International Nuclear Information System (INIS)

    1995-03-01

    This is Appendix A to a draft Environmental Impact Statement on a Proposed Nuclear Weapons Nonproliferation Policy Concerning Foreign Research Reactor Spent Nuclear Fuel. This appendix addresses environmental justice for the acceptance of foreign research reactor spent nuclear fuel containing uranium enriched in the United States. Analyses of environmental justice concerns are provided in three areas: (1) potential ports of entry, (2) potential transportation routes from candidate ports of entry to interim management sites, and (3) areas surrounding potential interim management sites. These analyses lead to the conclusion that the alternatives analyzed in this Environmental Impact Statement (EIS) would result in no disproportionate adverse effects on minority populations or low-income communities surrounding the candidate ports, transport routes, or interim management sites

  1. Testing REACH draft technical guidance notes for conducting chemical safety assessments-the experience of a downstream user of a preparation.

    Science.gov (United States)

    Gade, Anne Lill; Ovrebø, Steinar; Hylland, Ketil

    2008-07-01

    The goal of REACH is the safe use of chemicals. This study examines the efficiency and usefulness of two draft technical guidance notes in the REACH Interim Project 3.2-2 for the development of the chemical safety report and exposure scenarios. A case study was carried out for a paint system for protection of structural steel. The focuses of the study were risk assessment of preparations based on Derived No Effect Level (DNEL) and Predicted No Effect Concentrations (PNEC) and on effective and accurate communication in the supply chain. Exposure scenarios and generic descriptions of uses, risk management measures, and exposure determinants were developed. The study showed that communication formats, software tools, and guidelines for chemical risk assessment need further adjustment to preparations and real-life situations. Web platforms may simplify such communication. The downstream formulator needs basic substance data from the substance manufacturer during the pre-registration phase to develop exposure scenarios for preparations. Default values need to be communicated in the supply chain because these were critical for the derivation of applicable risk management demands. The current guidelines which rely on the available toxicological knowledge are insufficient to advise downstream users on how to develop exposure scenarios for preparations.

  2. 40 CFR 57.302 - Performance level of interim constant controls.

    Science.gov (United States)

    2010-07-01

    ... correction of the effects of any serious deficiencies in the system. For the purpose of this paragraph, at... system if the smelter owner has not upgraded serious deficiencies in the constant control system in... 40 Protection of Environment 5 2010-07-01 2010-07-01 false Performance level of interim constant...

  3. FRACTIONAL CRYSTALLIZATION TESTING WITH INTERIM PRETREATMENT SYSTEM FEEDS

    International Nuclear Information System (INIS)

    HERTING DL

    2008-01-01

    The fractional crystallization process was developed as a pretreatment method for saltcake waste retrieved from Hanford single-shell tanks (SST). The process separates the retrieved SST waste into a high-level waste stream containing the bulk of the radionuclides and a low-activity waste stream containing the bulk of the nonradioactive sodium salts. The Interim Pretreatment System project shifted the focus on pretreatment planning from SST waste to double-shell tank waste

  4. Dry storage of spent fuel elements: interim facility

    International Nuclear Information System (INIS)

    Quihillalt, O.J.

    1993-01-01

    Apart from the existing facilities to storage nuclear fuel elements at Argentina's nuclear power stations, a new interim storage facility has been planned and projected by the Argentinean Atomic Energy Commission (CNEA) that will be constructed by private group. This article presents the developments and describes the activities undertaken until the national policy approach to the final decision for the most suitable alternative to be adopted. (B.C.A.). 09 refs, 01 fig, 09 tabs

  5. Interim Stabilization Equipment Essential and Support Drawing Plan

    International Nuclear Information System (INIS)

    HORNER, T.M.

    2000-01-01

    The purpose of this document is to list the Interim Stabilization equipment drawings that are classified as Essential or Support drawings. Essential Drawings are those drawings identified by the facility staff as necessary to directly support the safe operation of the facility or equipment. [CHG 2000a]. Support Drawings are those drawings identified by the facility staff that further describe the design details of structures, systems or components shown on essential drawings. [CHG 2000a

  6. Functions and requirements document for interim store solidified high-level and transuranic waste

    Energy Technology Data Exchange (ETDEWEB)

    Smith-Fewell, M.A., Westinghouse Hanford

    1996-05-17

    The functions, requirements, interfaces, and architectures contained within the Functions and Requirements (F{ampersand}R) Document are based on the information currently contained within the TWRS Functions and Requirements database. The database also documents the set of technically defensible functions and requirements associated with the solidified waste interim storage mission.The F{ampersand}R Document provides a snapshot in time of the technical baseline for the project. The F{ampersand}R document is the product of functional analysis, requirements allocation and architectural structure definition. The technical baseline described in this document is traceable to the TWRS function 4.2.4.1, Interim Store Solidified Waste, and its related requirements, architecture, and interfaces.

  7. Financial compensation for municipalities hosting interim or final disposal facilities for radioactive waste

    International Nuclear Information System (INIS)

    Barboza, Alex; Vicente, Roberto

    2005-01-01

    Brazilian Law No. 10308 issued November 20, 2001, establishes in its 34th article that 'those municipalities hosting interim or final disposal facilities for radioactive waste are eligible to receive a monthly payment as compensation'. The values of due payments depend on parameters such as volume of wastes and activity and half-lives of the radionuclides. The method to calculating those values was established by the National Commission on Nuclear Energy, the Brazilian regulatory authority, by Resolution No. 10, issued in the August 18, 2003. In this paper we report the application of that method to a low- and intermediate-level radioactive waste interim storage facility at the Nuclear Energy Research Institute. (author)

  8. 76 FR 66040 - NIST Framework and Roadmap for Smart Grid Interoperability Standards, Release 2.0 (Draft...

    Science.gov (United States)

    2011-10-25

    ...-01] NIST Framework and Roadmap for Smart Grid Interoperability Standards, Release 2.0 (Draft... draft version of the NIST Framework and Roadmap for Smart Grid Interoperability Standards, Release 2.0... Roadmap for Smart Grid Interoperability Standards, Release 2.0 (Release 2.0) (Draft) for public review and...

  9. 76 FR 38187 - International Conference on Harmonisation; Draft Guidance on Q11 Development and Manufacture of...

    Science.gov (United States)

    2011-06-29

    ...] International Conference on Harmonisation; Draft Guidance on Q11 Development and Manufacture of Drug Substances... Manufacture of Drug Substances.'' The draft guidance was prepared under the auspices of the International... that a draft guidance entitled ``Q11 Development and Manufacture of Drug Substances'' should be made...

  10. 78 FR 68852 - Draft Guidance for Industry on Acrylamide in Foods; Availability

    Science.gov (United States)

    2013-11-15

    ... placing preparation and cooking instructions on frozen French fry packages. Lastly, the draft guidance is... high-temperature cooking. The draft guidance is intended to suggest a range of possible approaches to... during certain types of high-temperature cooking, and is a concern because it can cause cancer in...

  11. 76 FR 64327 - Office of Oceanic and Atmospheric Research Draft Strategic Plan

    Science.gov (United States)

    2011-10-18

    ...: 111003608-1608-01] Office of Oceanic and Atmospheric Research Draft Strategic Plan AGENCY: Office of Oceanic... notice announces that OAR's draft Strategic Plan (FY12- 18) is available for public review and comment... next six years. These goals and objectives will provide guidance and strategic direction for program...

  12. 75 FR 57081 - Revised Draft Safety Culture Policy Statement: Request for Comments

    Science.gov (United States)

    2010-09-17

    ... culture. Experience has shown that certain personal and organizational traits are present in a positive safety culture. A trait, in this case, is a pattern of thinking, feeling, and behaving that emphasizes... organizational environments. IV. Changes to the Initial Draft Statement of Policy Like the initial draft SOP, the...

  13. AGR-1 Data Qualification Interim Report

    International Nuclear Information System (INIS)

    Abbott, Machael

    2009-01-01

    Projects for the very-high-temperature reactor (VHTR) program provide data in support of Nuclear Regulatory Commission licensing of the VHTR. Fuel and materials to be used in the reactor are tested and characterized to quantify performance in high temperature and high fluence environments. The VHTR Program has established the NGNP Data Management and Analysis System (NDMAS) to ensure that VHTR data are (1) qualified for use, (2) stored in a readily accessible electronic form, and (3) analyzed to extract useful results. This document focuses on the first NDMAS objective. It describes the data streams associated with the first Advanced Gas Reactor (AGR-1) experiment, the processing of these data within NDMAS, and reports the interim FY09 qualification status of the AGR-1 data to date. Data qualification activities within NDMAS for specific types of data are determined by the data qualification category, which is assigned by the data generator, and include: (1) capture testing, to confirm that the data stored within NDMAS are identical to the raw data supplied, (2) accuracy testing, to confirm that the data are an accurate representation of the system or object being measured, and (3) documentation that the data were collected under an NQA-1 or equivalent QA program. The interim qualification status of the following four data streams is reported in this document: (1) fuel fabrication data, (2) fuel irradiation data, (3) fission product monitoring system (FPMS) data, and (4) Advanced Test Reactor (ATR) operating conditions data. A final report giving the NDMAS qualification status of all AGR-1 data (including cycle 145A) is planned for February 2010

  14. ETF interim design review

    International Nuclear Information System (INIS)

    Steiner, D.; Rutherford, P.H.

    1980-01-01

    A three-day ETF Interim Design Review was conducted on July 23-25, 1980, at the Sheraton Potomac Inn in Rockville, Maryland. The intent of the review was to provide a forum for an in-depth assessment and critique of all facets of the ETF design by members of the fusion community. The review began with an opening plenary session at which an overview of the ETF design was presented by D. Steiner, manager of the ETF Design Center, complemented by a physics overview by P.H. Rutherford, chairman of the ETF/INTOR Physics Committee. This was followed by six concurrent review sessions over the next day and a half. The review closed with a plenary session at which the Design Review Board presented its findings. This document consists of the viewgraphs for the opening plenary session and an edited version of the presentations made by Steiner and Rutherford

  15. Annex D-200 Area Interim Storage Area Final Safety Analysis Report [FSAR] [Section 1 & 2

    Energy Technology Data Exchange (ETDEWEB)

    CARRELL, R D

    2002-07-16

    The 200 Area Interim Storage Area (200 Area ISA) at the Hanford Site provides for the interim storage of non-defense reactor spent nuclear fuel (SNF) housed in aboveground dry cask storage systems. The 200 Area ISA is a relatively simple facility consisting of a boundary fence with gates, perimeter lighting, and concrete and gravel pads on which to place the dry storage casks. The fence supports safeguards and security and establishes a radiation protection buffer zone. The 200 Area ISA is nominally 200,000 ft{sup 2} and is located west of the Canister Storage Building (CSB). Interim storage at the 200 Area ISA is intended for a period of up to 40 years until the materials are shipped off-site to a disposal facility. This Final Safety Analysis Report (FSAR) does not address removal from storage or shipment from the 200 Area ISA. Three different SNF types contained in three different dry cask storage systems are to be stored at the 200 Area ISA, as follows: (1) Fast Flux Test Facility Fuel--Fifty-three interim storage casks (ISC), each holding a core component container (CCC), will be used to store the Fast Flux Test Facility (FFTF) SNF currently in the 400 Area. (2) Neutron Radiography Facility (NRF) TRIGA'--One Rad-Vault' container will store two DOT-6M3 containers and six NRF TRIGA casks currently stored in the 400 Area. (3) Commercial Light Water Reactor Fuel--Six International Standards Organization (ISO) containers, each holding a NAC-I cask4 with an inner commercial light water reactor (LWR) canister, will be used for commercial LWR SNF from the 300 Area. An aboveground dry cask storage location is necessary for the spent fuel because the current storage facilities are being shut down and deactivated. The spent fuel is being transferred to interim storage because there is no permanent repository storage currently available.

  16. Release of radionuclides following severe accident in interim storage facility. Source term determination

    International Nuclear Information System (INIS)

    Morandi, S.; Mariani, M.; Giacobbo, F.; Covini, R.

    2006-01-01

    Among the severe accidents that can cause the release of radionuclides from an interim storage facility, with a consequent relevant radiological impact on the population, there is the impact of an aircraft on the facility. In this work, a safety assessment analysis for the case of an aircraft crash into an interim storage facility is tackled. To this aim a methodology, based upon DOE, IAEA and NUREG standard procedures and upon conservative yet realistic hypothesis, has been developed in order to evaluate the total radioactivity, source term, released to the biosphere in consequence of the impact, without recurring to the use of complicated numerical codes. The procedure consists in the identification of the accidental scenarios, in the evaluation of the consequent damage to the building structures and to the waste packages and in the determination of the total release of radionuclides through the building-atmosphere interface. The methodology here developed has been applied to the case of an aircraft crash into an interim storage facility currently under design. Results show that in case of perforation followed by a fire incident the total released activity would be greater of some orders of magnitude with respect to the case of mere perforation. (author)

  17. POSSIBLE ROLE OF INDOOR RADON REDUCTION SYSTEMS IN BACK-DRAFTING RESIDENTIAL COMBUSTION APPLIANCES

    Science.gov (United States)

    The article gives results of a computational sensitivity analysis conducted to identify conditions under which residential active soil depressurization (ASD) systems for indoor radon reduction might contribute to or create back-drafting of natural draft combustion appliances. Par...

  18. Experience with the licensing of the interim spent fuel storage facility modification

    International Nuclear Information System (INIS)

    Bezak, S.; Beres, J.

    1999-01-01

    After political and economical changes in the end of eighties, the utility operating the nuclear power plants in the Slovak Republic (SE, a.s.) decided to change the original scheme of the back-end of the nuclear fuel cycle; instead of reprocessing in the USSR/Russian Federation spent fuel will be stored in an interim spent fuel storage facility until the time of the final decision. As the best solution, a modification of the existing interim spent fuel storage facility has been proposed. Due to lack of legal documents for this area, the Regulatory Authority of the Slovak Republic (UJD SR) performed licensing procedures of the modification on the basis of recommendations by the IAEA, the US NRC and the relevant parts of the US CFR Title 10. (author)

  19. The possible role of indoor radon reduction systems in back-drafting residential combustion appliances

    International Nuclear Information System (INIS)

    Henschel, D.B.

    1997-01-01

    A computational sensitivity analysis was conducted to identify the conditions under which residential active soil depressurization (ASD) systems for indoor radon reduction might most likely exacerbate or create back-drafting of natural-draft combustion appliances. Parameters varied included: house size; normalized leakage area; exhaust rate of exhaust appliances other than the ASD system; and the amount of house air exhausted by the ASD system. Even with a reasonably conservative set of assumptions, it is predicted that ASD systems should not exacerbate or create back- drafting in most of the U.S. housing stock. Only at normalized leakage areas lower than 3 to 4 cm 2 commercial at 4 Pa) per m 2 of floor area should ASD contribute to back-drafting, even in small houses at high ASD exhaust rates (compared to a mean of over 10 cm 2 /m 2 determined from data on over 12,000 U.S. houses). But on the other hand, even with a more forgiving set of assumptions, it is predicted that ASD systems could contribute to back-drafting in some fraction of the housing stock -houses tighter than about 1 to 2 cm 2 /m 2 - even in large houses at minimal ASD exhaust rates. It is not possible to use parameters such as house size or ASD system flow rate to estimate reliably the risk that an ASD system might contribute to back-drafting in a given house. Spillage/back-draft testing would be needed for essentially all installations. (au) 18 refs

  20. 32 CFR 989.19 - Draft EIS.

    Science.gov (United States)

    2010-07-01

    ... summary to the public with an attached list of locations (such as public libraries) where the entire draft... a proposed action will potentially have disproportionately high and adverse human health or... as when there has been a significant change in circumstances, development of significant new...

  1. 78 FR 64428 - Draft Qualitative Risk Assessment of Risk of Activity/Animal Food Combinations for Activities...

    Science.gov (United States)

    2013-10-29

    .... FDA-2013-N-1043] Draft Qualitative Risk Assessment of Risk of Activity/Animal Food Combinations for... entitled ``Draft Qualitative Risk Assessment of Risk of Activity/Animal Food Combinations for Activities...(n) of the FD&C Act. II. Qualitative Risk Assessment As explained in the draft RA, we conducted the...

  2. 76 FR 24511 - Cabo Rojo National Wildlife Refuge, Cabo Rojo, Puerto Rico; Draft Comprehensive Conservation Plan...

    Science.gov (United States)

    2011-05-02

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R4-R-2010-N277; 40136-1265-0000-S3] Cabo Rojo National Wildlife Refuge, Cabo Rojo, Puerto Rico; Draft Comprehensive Conservation Plan and... draft comprehensive conservation plan and environmental assessment (Draft CCP/EA) for Cabo Rojo National...

  3. 78 FR 12329 - Distinguishing Medical Device Recalls From Product Enhancements; Reporting Requirements; Draft...

    Science.gov (United States)

    2013-02-22

    ... medical devices to take timely action to correct violative devices or remove them from the marketplace...] Distinguishing Medical Device Recalls From Product Enhancements; Reporting Requirements; Draft Guidance for... draft guidance entitled ``Distinguishing Medical Device Recalls From Product Enhancements; Reporting...

  4. 75 FR 53979 - Bison Brucellosis Remote Vaccination, Draft Environmental Impact Statement, Yellowstone National...

    Science.gov (United States)

    2010-09-02

    ... DEPARTMENT OF THE INTERIOR National Park Service Bison Brucellosis Remote Vaccination, Draft Environmental Impact Statement, Yellowstone National Park, Wyoming ACTION: Reopening of public comment period... Brucellosis Remote Vaccination Draft Environmental Impact Statement. The original comment period was from 28...

  5. Safety of Long-term Interim Storage Facilities - Workshop Proceedings

    International Nuclear Information System (INIS)

    2014-01-01

    The objective of this workshop was to discuss and review current national activities, plans and regulatory approaches for the safety of long term interim storage facilities dedicated to spent nuclear fuel (SF), high level waste (HLW) and other radioactive materials with prolonged storage regimes. It was also intended to discuss results of experiments and to identify necessary R and D to confirm safety of fuel and cask during the long-term storage. Safety authorities and their Technical Support Organisation (TSO), Fuel Cycle Facilities (FCF) operating organisations and international organisations were invited to share information on their approaches, practices and current developments. The workshop was organised in an opening session, three technical sessions, and a conclusion session. The technical sessions were focused on: - National approaches for long term interim storage facilities; - Safety requirements, regulatory framework and implementation issues; - Technical issues and operational experience, needs for R and D. Each session consisted of a number of presentations followed by a panel discussion moderated by the session Chairs. A summary of each session and subsequent discussion that ensued are provided as well as a summary of the results of the workshop with the text of the papers given and presentations made

  6. Interim sanitary landfill groundwater monitoring report. 1996 Annual report

    International Nuclear Information System (INIS)

    Bagwell, L.A.

    1997-01-01

    Eight wells of the LFW series monitor groundwater quality in the Steed Pond Aquifer (Water Table) beneath the Interim Sanitary Landfill at the Savannah River Site. These wells are sampled semiannually to comply with the South Carolina Department of Health and Environmental Control Modified Municipal Solid Waste Permit 025500-1120 and as part of the SRS Groundwater Monitoring Program. Trichlorofluoromethane and 1,1,1-trichloroethane were elevated in one sidegradient well and one downgradient well during 1996. Zinc was elevated in three downgradient wells and also was detected in the associated laboratory blanks for two of those wells. Specific conductance was elevated in one background well and one sidegradient well. Barium and copper exceeded standards in one sidegradient well, and dichloromethane (a common laboratory contaminant) was elevated in another sidegradient well. Barium, copper, and dichloromethane were detected in the associated blanks for these wells, also. The groundwater flow direction in the Steed Pond Acquifer (Water Table) beneath the Interim Sanitary Landfill was to the southeast (universal transverse Mercator coordinates). The flow rate in this unit was approximately 210 ft/year during first quarter 1996 and 180 ft/yr during third quarter 1996

  7. 21 CFR 10.80 - Dissemination of draft Federal Register notices and regulations.

    Science.gov (United States)

    2010-04-01

    ... petitioner relating to the draft will be recorded in a written memorandum, and all memoranda and... may discuss orally or in writing with an interested person ideas and recommendations for notices or... must be in writing and filed with the Division of Dockets Management. (2) A draft of a notice or...

  8. Interim Reliability Evaluation Program procedures guide

    International Nuclear Information System (INIS)

    Carlson, D.D.; Gallup, D.R.; Kolaczkowski, A.M.; Kolb, G.J.; Stack, D.W.; Lofgren, E.; Horton, W.H.; Lobner, P.R.

    1983-01-01

    This document presents procedures for conducting analyses of a scope similar to those performed in Phase II of the Interim Reliability Evaluation Program (IREP). It documents the current state of the art in performing the plant systems analysis portion of a probabilistic risk assessment. Insights gained into managing such an analysis are discussed. Step-by-step procedures and methodological guidance constitute the major portion of the document. While not to be viewed as a cookbook, the procedures set forth the principal steps in performing an IREP analysis. Guidance for resolving the problems encountered in previous analyses is offered. Numerous examples and representative products from previous analyses clarify the discussion

  9. Application of NUREG/CR-5999 interim fatigue curves to selected nuclear power plant components

    International Nuclear Information System (INIS)

    Ware, A.G.; Morton, D.K.; Nitzel, M.E.

    1995-03-01

    Recent test data indicate that the effects of the light water reactor (LWR) environment could significantly reduce the fatigue resistance of materials used in the reactor coolant pressure boundary components of operating nuclear power plants. Argonne National Laboratory has developed interim fatigue curves based on test data simulating LWR conditions, and published them in NUREG/CR-5999. In order to assess the significance of these interim fatigue curves, fatigue evaluations of a sample of the components in the reactor coolant pressure boundary of LWRs were performed. The sample consists of components from facilities designed by each of the four U.S. nuclear steam supply system vendors. For each facility, six locations were studied, including two locations on the reactor pressure vessel. In addition, there are older vintage plants where components of the reactor coolant pressure boundary were designed to codes that did not require an explicit fatigue analysis of the components. In order to assess the fatigue resistance of the older vintage plants, an evaluation was also conducted on selected components of three of these plants. This report discusses the insights gained from the application of the interim fatigue curves to components of seven operating nuclear power plants

  10. 77 FR 8902 - Draft Regulatory Guide: Issuance, Availability Decommissioning of Nuclear Power Reactors

    Science.gov (United States)

    2012-02-15

    ... Decommissioning of Nuclear Power Reactors AGENCY: Nuclear Regulatory Commission. ACTION: Draft regulatory guide... draft regulatory guide (DG) DG-1271 ``Decommissioning of Nuclear Power Reactors.'' This guide describes... Regulatory Guide 1.184, ``Decommissioning of Nuclear Power Reactors,'' dated July 2000. This proposed...

  11. Energy transformation and flow topology in an elbow draft tube

    Directory of Open Access Journals (Sweden)

    Štefan D.

    2012-06-01

    Full Text Available Paper presents a computational study of energy transformation in two geometrical configurations of Kaplan turbine elbow draft tube. Pressure recovery, hydraulic efficiency and loss coefficient are evaluated for a series of flow rates and swirl numbers corresponding to operating regimes of the turbine. These integral characteristics are then correlated with local flow field properties identified by extraction of topological features. Main focus is to find the reasons for hydraulic efficiency drop of the elbow draft tube.

  12. CFD Analysis of The Hydraulic Turbine Draft Tube to Improve System Efficiency

    Directory of Open Access Journals (Sweden)

    Chakrabarty Spandan

    2016-01-01

    Full Text Available Demand of the power is increasing day by day with the development of the science and technology. Development of the renewable energy sector has become essential issue at the present situation due to the limited source of the non-renewable energy. Hydro energy power generation sector is superior over the other renewable sector due to the high efficiency, ability to continuous generation and low generation cost. In India a great amount of the power generation is taken care by the hydro power system but still some more potential have unexplored. The efficiency improvement of the hydro turbine system can be done for the new installation or installed system by the improvement in component level. The system can be installed by the state of the art equipment, like modern inlet guide vane (IGV control system, improved design of the runner, IGV system, draft tube, penstock to reduce the loss, hence improve the efficiency. The energy recovery in the draft tube depends on the design of draft tube. In the present work the optimized design of the draft tube shape through computational fluid dynamics (CFD simulation has been carried out in ANSYS FLUENT platform. The design objective of the draft tube is to reduce the flow loss and improve the energy recovery, hence to improve the efficiency.

  13. DER Certification Laboratory Pilot, Accreditation Plan, and Interconnection Agreement Handbook

    Energy Technology Data Exchange (ETDEWEB)

    Key, T.; Sitzlar, H. E.; Ferraro, R.

    2003-11-01

    This report describes the first steps toward creating the organization, procedures, plans and tools for distributed energy resources (DER) equipment certification, test laboratory accreditation, and interconnection agreements. It covers the activities and accomplishments during the first period of a multiyear effort. It summarizes steps taken to outline a certification plan to assist in the future development of an interim plan for certification and accreditation activities. It also summarizes work toward a draft plan for certification, a beta Web site to support communications and materials, and preliminary draft certification criteria.

  14. Interim Restorative Approach for the Management of Congenitally Missing Permanent Mandibular Incisors: Presentation of Three Cases

    Directory of Open Access Journals (Sweden)

    Prashanth Prakash

    2011-01-01

    Full Text Available Congenital missing of mandibular permanent incisors with retained primary incisors may jeopardize the esthetic appearance and psychological development of children, especially during the years of transition into adolescence. The retained primary teeth are necessary for the maintenance and normal development of alveolar bone, which in turn is essential for future definitive rehabilitation. In such situations, an interim restoration may be provided before any definitive treatment is given to comfort the young patient during this transition period. Interim restorations may include resin-modified additions to the existing teeth as well as more sophisticated restorations such as resin-retained bridge and removable partial dentures. However, this restoration differs for different clinical situations based on various factors such as age and patient compliance, and also consideration has to be given for the growth changes of the child. The aim of this present paper is to discuss the esthetic management of three cases with bilateral agenesis of permanent mandibular incisors and retained primary incisors with composite interim restoration.

  15. Structure and drafting of safeguards regulatory documents

    International Nuclear Information System (INIS)

    Cole, R.J.; Bennett, C.A.; Edelhertz, H.; Wood, M.T.; Brown, R.J.; Roberts, F.P.

    1977-09-01

    This study develops hypothesis about the relation between the structure and drafting of safeguards regulatory documents and the ability of document users to understand and implement them in a way that reflects the intent and requirements of the NRC. Four decisions are needed to improve communication: (1) Should improvement of safeguards regulatory documents as communication instruments be an explicit NRC program. (2) What specific methods of communication should be the focus of improvement efforts. (3) What actions to improve communications are feasible and desirable. (4) How should the NRC divide its available effort and resources among desirable actions in order to provide the most effective communication through regulatory documents. This volume contains: introduction, conceptual bases, legal requirements, targets, choice of documents, preparation of documents, readability, and further study of recommended changes in structure and drafting

  16. Adding Realism to Technical Drafting Programs

    Science.gov (United States)

    Weaver, Gerald L.

    1976-01-01

    Suggestions for improved, relevant technical drafting programs are presented: (1) making realistic assignments, (2) viewing real projects, (3) duplicating industrial projects, (4) practicing lettering, (5) conducting research, (6) engaging in teamwork, (7) adapting to change, (8) learning to meet deadlines, and (9) stressing the importance of…

  17. Review of site recommendation process in Draft Environmental Assessments

    International Nuclear Information System (INIS)

    Joy, H.; Longo, T.; Burton, E.S.

    1985-01-01

    In December 1984, the US Department of Energy (DOE) published Draft Environmental Assessments (EAs) on nine potentially acceptable nuclear waste repository sites. Five sites in the states of Mississippi, Nevada, Texas, Utah, and Washington were proposed in the Draft EAs for nomination under the Nuclear Waste Policy Act as suitable for further detailed study (site characterization). The Nevada, Texas, and Washington sites were further proposed for recommendation to the President as preferred for site characterization. This paper reviews the process that DOE used in selecting the three sites proposed for site characterization. The process is consistent with DOE's implementation guidelines for selecting repository sites, and proceeds in three steps. First, the sites are ranked in order of preference for each of twenty technical guidelines based on information in the Draft EAs. The second step combines the individual guideline rankings into postclosure and preclosure guideline group rankings, and, finally, into an overall ranking. In the third step, the sensitivity of the choice of the three preferred sites is examined for a range of guideline weightings

  18. Interim Sanitary Landfill Groundwater Monitoring Report. 1997 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-01-01

    Eight wells of the LFW series monitor groundwater quality in the Steed Pond Aquifer (Water Table) beneath the Interim Sanitary Landfill at the Savannah River Site (SRS). These wells are sampled semiannually to comply with the South Carolina Department of Health and Environmental Control Modified Municipal Solid Waste Permit 025500-1120 (formerly dWP-087A) and as part of the SRS Groundwater Monitoring Program.

  19. Shanghai Futures Exchange Published Draft of Tin and Nickel Futures Contract

    Institute of Scientific and Technical Information of China (English)

    2015-01-01

    Shanghai Futures Exchange published draft for soliciting opinions for tin and nickel futures contract on its official website on January 19,which implies the marketing time of the long awaited tin and nickel futures is drawing near.According to the draft for soliciting opinions,the transaction unit of tin futures contract is 1tonne/lot,minimum variation unit is 10 yuan/tonne,daily maximum price fluctuation shall

  20. Hazardous waste management programs; Florida: authorization for interim authorization phase I--Environmental Protection Agency. Notice of final determination.

    Science.gov (United States)

    1982-05-07

    The State of Florida has applied for interim Authorization Phase I. EPA has reviewed Florida's application for Phase I and has determined that Florida's hazardous waste program is substantially equivalent to the Federal program covered by Phase I. The State of Florida is, hereby, granted Interim Authorization for Phase I to operate the State 's hazardous waste program, in lieu of the Federal program.