  1. Scheduling with Time Lags

    NARCIS (Netherlands)

    X. Zhang (Xiandong)

    2010-01-01

    textabstractScheduling is essential when activities need to be allocated to scarce resources over time. Motivated by the problem of scheduling barges along container terminals in the Port of Rotterdam, this thesis designs and analyzes algorithms for various on-line and off-line scheduling problems

  2. Scheduling the scheduling task : a time management perspective on scheduling

    NARCIS (Netherlands)

    Larco Martinelli, J.A.; Wiers, V.C.S.; Fransoo, J.C.

    2013-01-01

    Time is the most critical resource at the disposal of schedulers. Hence, an adequate management of time from the schedulers may impact positively on the scheduler’s productivity and responsiveness to uncertain scheduling environments. This paper presents a field study of how schedulers make use of

  3. Time-Dependent Kinetics of Tretinoin in Chronic Myelogenous Leukaemia during Intermittent Dose Scheduling: 1 Week On/1 Week Off.

    Science.gov (United States)

    Regazzi, M B; Russo, D; Iacona, I; Sacchi, S; Visani, G; Lazzarino, M; Avvisati, G; Pelicci, P G; Dastoli, G; Grandi, C; Spreafico, S; Grattoni, R; Galieni, P; Rupoli, S; Maiolo, A M; Guerra, E; Liberati, A M

    1998-01-01

    This study investigated the pharmacokinetics of tretinoin during alternating cycles of 1 week of tretinoin treatment and 1 week drug-free in patients with Ph1+ chronic myelogenous leukaemia (CML) in the chronic phase. Eighteen patients with CML were treated with tretinoin 80 mg/m(2)/day (in two divided doses) for 7 consecutive days every other week (one cycle = 1 week on/1 week off). Body systemic exposure to tretinoin as determined by the area under the plasma concentration-time curve (AUC) decreased significantly during the first week of drug administration, from (mean +/- SD) 678.3 +/- 498.1 to 258.7 +/- 272.4 microg/L.h. In about 40% of the patients the decline in plasma concentrations was >/=80%, while 17% of the population did not experience any decline. On day 7 of cycle 1, the mean apparent oral clearance (CL/F) was 2.6 times the corresponding value on day 1. After 1 week without tretinoin, the mean AUC on day 1 of cycle 2 was lower (down 15%) but not statistically different from the corresponding value observed on day 1 of cycle 1; 62% of patients showed an increase in the AUC, which was 40% higher than the corresponding value on day 7 of cycle 1. On day 1 of cycle 6, the AUC and CL/F of tretinoin during a dosage interval were not statistically different from those observed on day 1 of cycle 1 and cycle 2. On all occasions the peak plasma concentration (C(max)) was strongly correlated to the corresponding AUC. No significant change in the time to observed C(max) (t(max)) and in the elimination half-life (t((1/2))) was observed during the whole study. These results confirmed that the metabolism of tretinoin is rapidly up-regulated in CML patients, with significant declines in plasma drug exposure during the first week of drug administration. After tretinoin was discontinued, a return to the noninduced state followed a mean time-cycle similar to the induction. The strong decrease in the apparent oral drug clearance and the absence of significant variations

  4. Scheduling with target start times

    NARCIS (Netherlands)

    Hoogeveen, J.A.; Velde, van de S.L.; Klein Haneveld, W.K.; Vrieze, O.J.; Kallenberg, L.C.M.

    1997-01-01

    We address the single-machine problem of scheduling n independent jobs subject to target start times. Target start times are essentially release times that may be violated at a certain cost. The goal is to minimize an objective function that is composed of total completion time and maximum

  5. Maternal methadone dosing schedule and fetal neurobehavior

    Science.gov (United States)

    Jansson, Lauren M.; DiPietro, Janet A.; Velez, Martha; Elko, Andrea; Knauer, Heather; Kivlighan, Katie T.

    2008-01-01

    Objective Daily methadone maintenance is the standard of care for opiate dependency during pregnancy. Previous research has indicated that single-dose maternal methadone administration significantly suppresses fetal neurobehaviors. The purpose of this study was to determine if split-dosing would have less impact on fetal neurobehavior than single-dose administration. Methods Forty methadone-maintained women were evaluated at peak and trough maternal methadone levels on single- and split-dosing schedules. Monitoring sessions occurred at 36 and 37 weeks gestation in a counterbalanced study design. Fetal measures included heart rate, variability, accelerations, motor activity and fetal movement-heart rate coupling (FM-FHR). Maternal measures included heart period, variability, skin conductance, respiration and vagal tone. Repeated measure analysis of variance was used to evaluate within-subject changes between split- and single-dosing regimens. Results All fetal neurobehavioral parameters were suppressed by maternal methadone administration, regardless of dosing regimen. Fetal parameters at peak were significantly lower during single vs. split methadone administration. FM-FHR coupling was less suppressed from trough to peak during split-dosing vs. single-dosing. Maternal physiologic parameters were generally unaffected by dosing condition. Conclusion Split- dosed fetuses displayed less neurobehavioral suppression from trough to peak maternal methadone levels as compared to single-dosed fetuses. Split-dosing may be beneficial for methadone-maintained pregnant women. PMID:19085624

  6. Time-dose modifications

    International Nuclear Information System (INIS)

    Kian Ang, K.

    1987-01-01

    Changes in fractionation schedule can be made by various approaches. However, from the first principle, it is anticipated that strategies of hyperfractionation and/or accelerated fractionation offer the most promised in improving the therapeutic ratio. Hyperfractionation is defined as a treatment schedule in which a large number of significantly reduced dose fractions (--1.2 Gy/fraction) is used to give a greater total dose in a conventional overall time period. The results of the pilot studies testing the efficacy of hyperfractionation have been encouraging. The most valid clinical trial of pure hyperfractionation, however, is that conducted by the EORTC. This study compared 70 Gy in 35 fractions or 80.5 Gy in 70 fractions over 7 weeks in the treatment of patients with oropharyngeal carcinomas. The local tumor control was significantly improved in the hyperfractionated arm without increasing the morbidity. Accelerated fractionation is defined as a schedule in which the overall time of treatment is reduced without significant changes in the total dose and fraction size. The strategy has been used to treat patients with malignant gliomas, melanomas and Head and Neck cancers. The data in Head and Neck Cancers seem to be promising

  7. Scheduling with time-dependent execution times

    NARCIS (Netherlands)

    Woeginger, G.J.

    1995-01-01

    We consider systems of tasks where the task execution times are time-dependent and where all tasks have some common deadline. We describe how to compute in polynomial time a schedule that minimizes the number of late tasks. This answers a question raised in a recent paper by Ho, Leung and Wei.

  8. Optimal Intermittent Dose Schedules for Chemotherapy Using Genetic Algorithm

    Directory of Open Access Journals (Sweden)

    Nadia ALAM

    2013-08-01

    Full Text Available In this paper, a design method for optimal cancer chemotherapy schedules via genetic algorithm (GA is presented. The design targets the key objective of chemotherapy to minimize the size of cancer tumor after a predefined time with keeping toxic side effects in limit. This is a difficult target to achieve using conventional clinical methods due to poor therapeutic indices of existing anti-cancer drugs. Moreover, there are clinical limitations in treatment administration to maintain continuous treatment. Besides, carefully decided rest periods are recommended to for patient’s comfort. Three intermittent drug scheduling schemes are presented in this paper where GA is used to optimize the dose quantities and timings by satisfying several treatment constraints. All three schemes are found to be effective in total elimination of cancer tumor after an agreed treatment length. The number of cancer cells is found zero at the end of the treatment for all three cases with tolerable toxicity. Finally, two of the schemes, “Fixed interval variable dose (FIVD and “Periodic dose” that are periodic in characteristic have been emphasized due to their additional simplicity in administration along with friendliness to patients. responses to the designed treatment schedules. Therefore the proposed design method is capable of planning effective, simple, patient friendly and acceptable chemotherapy schedules.

  9. Pulsed dose rate and fractionated high dose rate brachytherapy: choice of brachytherapy schedules to replace low dose rate treatments

    International Nuclear Information System (INIS)

    Visser, Andries G.; Aardweg, Gerard J.M.J. van den; Levendag, Peter C.

    1996-01-01

    Purpose: Pulsed dose rate (PDR) brachytherapy is a new type of afterloading brachytherapy (BT) in which a continuous low dose rate (LDR) treatment is simulated by a series of 'pulses,' i.e., fractions of short duration (less than 0.5 h) with intervals between fractions of 1 to a few hours. At the Dr. Daniel den Hoed Cancer Center, the term 'PDR brachytherapy' is used for treatment schedules with a large number of fractions (at least four per day), while the term 'fractionated high dose rate (HDR) brachytherapy' is used for treatment schedules with just one or two brachytherapy fractions per day. Both treatments can be applied as alternatives for LDR BT. This article deals with the choice between PDR and fractionated HDR schedules and proposes possible fractionation schedules. Methods and Materials: To calculate HDR and PDR fractionation schedules with the intention of being equivalent to LDR BT, the linear-quadratic (LQ) model has been used in an incomplete repair formulation as given by Brenner and Hall, and by Thames. In contrast to earlier applications of this model, both the total physical dose and the overall time were not kept identical for LDR and HDR/PDR schedules. A range of possible PDR treatment schedules is presented, both for booster applications (in combination with external radiotherapy (ERT) and for BT applications as a single treatment. Because the knowledge of both α/β values and the half time for repair of sublethal damage (T (1(2)) ), which are required for these calculations, is quite limited, calculations regarding the equivalence of LDR and PDR treatments have been performed for a wide range of values of α/β and T (1(2)) . The results are presented graphically as PDR/LDR dose ratios and as ratios of the PDR/LDR tumor control probabilities. Results: If the condition that total physical dose and overall time of a PDR treatment must be exactly identical to the values for the corresponding LDR treatment regimen is not applied, there appears

  10. Construction schedules slack time minimizing

    Science.gov (United States)

    Krzemiński, Michał

    2017-07-01

    The article presents two copyright models for minimizing downtime working brigades. Models have been developed for construction schedules performed using the method of work uniform. Application of flow shop models is possible and useful for the implementation of large objects, which can be divided into plots. The article also presents a condition describing gives which model should be used, as well as a brief example of optimization schedule. The optimization results confirm the legitimacy of the work on the newly-developed models.

  11. Dose response of rat retinal microvessels to proton dose schedules used clinically: a pilot study

    International Nuclear Information System (INIS)

    Archambeau, John O.; Mao, Xiao W.; McMillan, Paul J.; Gouloumet, Vanessa L.; Oeinck, Steven C.; Grove, Roger; Yonemoto, Leslie T.; Slater, Jerry D.; Slater, James M.

    2000-01-01

    Purpose: This preclinical rat pilot study quantifies retinal microvessel, endothelial, and pericyte population changes produced by proton irradiation Methods and Materials: The left eyes of rats were irradiated with single doses of 8, 14, 20, and 28 Gy protons; right eyes, with two fractions. Animals were euthanized, and eyes were removed; elastase digests were prepared, and cell populations were counted in sample fields. Results were compared with unirradiated controls. Results: Progressive time- and dose-dependent endothelial cell loss occurred following all schedules. Cell loss was significantly different from control values (p 0 phase of the mitotic cycle. 28 Gy produced photoreceptor cell loss. Conclusion: The retinal digest is an elegant bioassay to quantify the microvessel population response. Single- and split-dose schedules appear to yield similar outcomes, in terms of endothelial cell density

  12. Impact of Hepatitis A vaccination with a two-dose schedule in Panama: Results of epidemiological surveillance and time trend analysis.

    Science.gov (United States)

    Estripeaut, Dora; Contreras, Rodolfo; Tinajeros, Olga; Castrejón, Maria Mercedes; Shafi, Fakrudeen; Ortega-Barria, Eduardo; DeAntonio, Rodrigo

    2015-06-22

    In April 2007, Panama introduced Hepatitis A universal vaccination using a two-dose schedule (Havrix(®)junior; GSK Vaccines, Belgium). We assessed the impact of this hepatitis A vaccine three years after it was recommended for universal mass vaccination in Panama. Hepatitis A vaccination impact was assessed using two different approaches. The first approach used retrospective data (incidence and number of cases for all age groups), collected from the passive surveillance of the Epidemiologic Surveillance System of the Ministry of Health of hepatitis A and unspecified hepatitis before (2000-2006) and after (2008-2010) introduction of hepatitis A vaccine. The second approach was a prospective hospital-based active surveillance for hepatitis cases conducted in subjects (0-14 years) during 2009-2011 at three sentinel hospitals in Panama. Overall, the annual incidence of hepatitis A and unspecified hepatitis in 2008, 2009 and 2010 were 13.1, 7.9 and 3.7 per 100,000 subjects, lower than the baseline incidence of 51.1 per 100,000 subjects. In comparison to the mean baseline period (2000-2006), there was an 82% mean reduction in the overall hepatitis-related outcomes (hepatitis A and unspecified hepatitis) after vaccine introduction (2008-2010) in all age groups. In the hospital-based surveillance (2009-2011), of the 42 probable viral hepatitis A cases, nine cases were confirmed as acute hepatitis A (8 in 2009, 1 in 2010). Of these confirmed cases, two belonged to the targeted vaccine group (1-4 years) but were not vaccinated. Our study suggests that the introduction of two-dose hepatitis A vaccines in Panama has contributed to the reduction in the incidence of overall hepatitis-related outcomes for all age groups, suggesting herd protection. Additional monitoring is required to document a sustained long-term effect. Copyright © 2015 The Authors. Published by Elsevier Ltd.. All rights reserved.

  13. Unit-time scheduling problems with time dependent resources

    NARCIS (Netherlands)

    Tautenhahn, T.; Woeginger, G.

    1997-01-01

    We investigate the computational complexity of scheduling problems, where the operations consume certain amounts of renewable resources which are available in time-dependent quantities. In particular, we consider unit-time open shop problems and unit-time scheduling problems with identical parallel

  14. Real-time systems scheduling 2 focuses

    CERN Document Server

    Chetto, Maryline

    2014-01-01

    Real-time systems are used in a wide range of applications, including control, sensing, multimedia, etc. Scheduling is a central problem for these computing/communication systems since it is responsible for software execution in a timely manner. This book, the second of two volumes on the subject, brings together knowledge on specific topics and discusses the recent advances for some of them.  It addresses foundations as well as the latest advances and findings in real-time scheduling, giving comprehensive references to important papers, but the chapters are short and not overloaded with co

  15. Real-time systems scheduling fundamentals

    CERN Document Server

    Chetto, Maryline

    2014-01-01

    Real-time systems are used in a wide range of applications, including control, sensing, multimedia, etc.  Scheduling is a central problem for these computing/communication systems since responsible of software execution in a timely manner. This book provides state of knowledge in this domain with special emphasis on the key results obtained within the last decade. This book addresses foundations as well as the latest advances and findings in Real-Time Scheduling, giving all references to important papers. But nevertheless the chapters will be short and not overloaded with confusing details.

  16. Multiprocessor scheduling for real-time systems

    CERN Document Server

    Baruah, Sanjoy; Buttazzo, Giorgio

    2015-01-01

    This book provides a comprehensive overview of both theoretical and pragmatic aspects of resource-allocation and scheduling in multiprocessor and multicore hard-real-time systems.  The authors derive new, abstract models of real-time tasks that capture accurately the salient features of real application systems that are to be implemented on multiprocessor platforms, and identify rules for mapping application systems onto the most appropriate models.  New run-time multiprocessor scheduling algorithms are presented, which are demonstrably better than those currently used, both in terms of run-time efficiency and tractability of off-line analysis.  Readers will benefit from a new design and analysis framework for multiprocessor real-time systems, which will translate into a significantly enhanced ability to provide formally verified, safety-critical real-time systems at a significantly lower cost.

  17. Proportional green time scheduling for traffic lights

    NARCIS (Netherlands)

    P. Kovacs; Le, T. (Tung); R. Núñez Queija (Rudesindo); Vu, H. (Hai); N. Walton

    2016-01-01

    textabstractWe consider the decentralized scheduling of a large number of urban traffic lights. We investigate factors determining system performance, in particular, the length of the traffic light cycle and the proportion of green time allocated to each junction. We study the effect of the length

  18. Split Scheduling with Uniform Setup Times

    NARCIS (Netherlands)

    Schalekamp, F.; Sitters, R.A.; van der Ster, S.L.; Stougie, L.; Verdugo, V.; van Zuylen, A.

    2015-01-01

    We study a scheduling problem in which jobs may be split into parts, where the parts of a split job may be processed simultaneously on more than one machine. Each part of a job requires a setup time, however, on the machine where the job part is processed. During setup, a machine cannot process or

  19. Split scheduling with uniform setup times.

    NARCIS (Netherlands)

    F. Schalekamp; R.A. Sitters (René); S.L. van der Ster; L. Stougie (Leen); V. Verdugo; A. van Zuylen

    2015-01-01

    htmlabstractWe study a scheduling problem in which jobs may be split into parts, where the parts of a split job may be processed simultaneously on more than one machine. Each part of a job requires a setup time, however, on the machine where the job part is processed. During setup, a

  20. Real-time scheduling of software tasks

    International Nuclear Information System (INIS)

    Hoff, L.T.

    1995-01-01

    When designing real-time systems, it is often desirable to schedule execution of software tasks based on the occurrence of events. The events may be clock ticks, interrupts from a hardware device, or software signals from other software tasks. If the nature of the events, is well understood, this scheduling is normally a static part of the system design. If the nature of the events is not completely understood, or is expected to change over time, it may be necessary to provide a mechanism for adjusting the scheduling of the software tasks. RHIC front-end computers (FECs) provide such a mechanism. The goals in designing this mechanism were to be as independent as possible of the underlying operating system, to allow for future expansion of the mechanism to handle new types of events, and to allow easy configuration. Some considerations which steered the design were programming paradigm (object oriented vs. procedural), programming language, and whether events are merely interesting moments in time, or whether they intrinsically have data associated with them. The design also needed to address performance and robustness tradeoffs involving shared task contexts, task priorities, and use of interrupt service routine (ISR) contexts vs. task contexts. This paper will explore these considerations and tradeoffs

  1. Optimal scheduling using priced timed automata

    DEFF Research Database (Denmark)

    Behrmann, Gerd; Larsen, Kim Guldstrand; Rasmussen, Jacob Illum

    2005-01-01

    This contribution reports on the considerable effort made recently towards extending and applying well-established timed automata technology to optimal scheduling and planning problems. The effort of the authors in this direction has to a large extent been carried out as part of the European...... projects VHS [20] and AMETIST [16] and are available in the recently released UPPAAL CORA [12], a variant of the real-time verification tool UPPAAL [18, 5] specialized for cost-optimal reachability for the extended model of so-called priced timed automata....

  2. Limited Preemptive Scheduling in Real-time Systems

    OpenAIRE

    Thekkilakattil, Abhilash

    2016-01-01

    Preemptive and non-preemptive scheduling paradigms typically introduce undesirable side effects when scheduling real-time tasks, mainly in the form of preemption overheads and blocking, that potentially compromise timeliness guarantees. The high preemption overheads in preemptive real-time scheduling may imply high resource utilization, often requiring significant over-provisioning, e.g., pessimistic Worst Case Execution Time (WCET) approximations. Non-preemptive scheduling, on the other hand...

  3. ALGORITHMIC CONSTRUCTION SCHEDULES IN CONDITIONS OF TIMING CONSTRAINTS

    Directory of Open Access Journals (Sweden)

    Alexey S. Dobrynin

    2014-01-01

    Full Text Available Tasks of time-schedule construction (JSSP in various fields of human activities have an important theoretical and practical significance. The main feature of these tasks is a timing requirement, describing allowed planning time periods and periods of downtime. This article describes implementation variations of the work scheduling algorithm under timing requirements for the tasks of industrial time-schedules construction, and service activities.

  4. Schedulability-Driven Communication Synthesis for Time Triggered Embedded Systems

    DEFF Research Database (Denmark)

    Pop, Paul; Eles, Petru; Peng, Zebo

    1999-01-01

    We present an approach to static priority preemptive process scheduling for the synthesis of hard real-time distributed embedded systems where communication plays an important role. The communication model is based on a time-triggered protocol. We have developed an analysis for the communication...... delays proposing four different message scheduling policies over a time-triggered communication channel. Optimization strategies for the synthesis of communication are developed, and the four approaches to message scheduling are compared using extensive experiments....

  5. Schedulability-Driven Communication Synthesis for Time Triggered Embedded Systems

    DEFF Research Database (Denmark)

    Pop, Paul; Eles, Petru; Peng, Zebo

    2004-01-01

    We present an approach to static priority preemptive process scheduling for the synthesis of hard real-time distributed embedded systems where communication plays an important role. The communication model is based on a time-triggered protocol. We have developed an analysis for the communication...... delays with four different message scheduling policies over a time-triggered communication channel. Optimization strategies for the synthesis of communication are developed, and the four approaches to message scheduling are compared using extensive experiments....

  6. Schedulability-Driven Communication Synthesis for Time Triggered Embedded Systems

    DEFF Research Database (Denmark)

    Pop, Paul; Eles, Petru; Peng, Zebo

    2006-01-01

    We present an approach to static priority preemptive process scheduling for the synthesis of hard real-time distributed embedded systems where communication plays an important role. The communication model is based on a time-triggered protocol. We have developed an analysis for the communication...... delays proposing four different message scheduling policies over a time-triggered communication channel. Optimization strategies for the synthesis of communication are developed, and the four approaches to message scheduling are compared using extensive experiments...

  7. Designing a fuzzy scheduler for hard real-time systems

    Science.gov (United States)

    Yen, John; Lee, Jonathan; Pfluger, Nathan; Natarajan, Swami

    1992-01-01

    In hard real-time systems, tasks have to be performed not only correctly, but also in a timely fashion. If timing constraints are not met, there might be severe consequences. Task scheduling is the most important problem in designing a hard real-time system, because the scheduling algorithm ensures that tasks meet their deadlines. However, the inherent nature of uncertainty in dynamic hard real-time systems increases the problems inherent in scheduling. In an effort to alleviate these problems, we have developed a fuzzy scheduler to facilitate searching for a feasible schedule. A set of fuzzy rules are proposed to guide the search. The situation we are trying to address is the performance of the system when no feasible solution can be found, and therefore, certain tasks will not be executed. We wish to limit the number of important tasks that are not scheduled.

  8. Time and dose in carcinogenesis

    International Nuclear Information System (INIS)

    Mayneord, W.V.; Clarke, R.H.

    1978-05-01

    Previous work on the implications of different forms of dose response relationships is extended to include time as a variable, not only in time of irradiation but also in the time of appearance of effects following irradiation. The forms of relationships for time distribution of tumours revealed experimentally for both radiation and chemical carcinogens are first considered. It appears that much data may be correlated in terms of a log-normal distribution of tumour yield following the insult. Further, it is noted, that there is evidence that the median time of tumour appearance may be a function of total dose received or even of dose rate for protracted exposure. Using numerical values of these parameters derived from the biological literature speculative studies have been made of the effects on dose response relationships of using a time distribution of tumour yield, considering both uniform irradiation and point sources. In addition the effects of using dose rate rather than dose to define the log-normal distribution to tumour appearance have been investigated. It is assumed that biological response is directly proportional to dose but that effect is distributed in time. From this linear assumption the appearance of non-linear dose response relationships and apparent thresholds are continually seen. Finally, both the importance of attempting analyses of biological data in terms of stochastic concepts and the need for biological data to test our hypotheses is emphasised. (author)

  9. Radical radiotherapy for invasive bladder cancer: What dose and fractionation schedule to choose?

    International Nuclear Information System (INIS)

    Pos, Floris J.; Hart, Guus; Schneider, Christoph; Sminia, Peter

    2006-01-01

    Purpose: To establish the α/β ratio of bladder cancer from different radiotherapy schedules reported in the literature and provide guidelines for the design of new treatment schemes. Methods and Materials: Ten external beam radiotherapy (EBRT) and five brachytherapy schedules were selected. The biologically effective dose (BED) of each schedule was calculated. Logistic modeling was used to describe the relationship between 3-year local control (LC3y) and BED. Results: The estimated α/β ratio was 13 Gy (95% confidence interval [CI], 2.5-69 Gy) for EBRT and 24 Gy (95% CI, 1.3-460 Gy) for EBRT and brachytherapy combined. There is evidence for an overall dose-response relationship. After an increase in total dose of 10 Gy, the odds of LC3y increase by a factor of 1.44 (95% CI, 1.23-1.70) for EBRT and 1.47 (95% CI, 1.25-1.72) for the data sets of EBRT and brachytherapy combined. Conclusion: With the clinical data currently available, a reliable estimation of the α/β ratio for bladder cancer is not feasible. It seems reasonable to use a conventional α/β ratio of 10-15 Gy. Dose escalation could significantly increase local control. There is no evidence to support short overall treatment times or large fraction sizes in radiotherapy for bladder cancer

  10. Parents' Family Time and Work Schedules: The Split-Shift Schedule in Spain

    NARCIS (Netherlands)

    Gracia, P.; Kalmijn, M.

    2016-01-01

    This study used data on couples from the 2003 Spanish Time Use Survey (N = 1,416) to analyze how work schedules are associated with family, couple, parent–child, and non-family leisure activities. Spain is clearly an interesting case for the institutionalized split-shift schedule, a long lunch break

  11. Multiprocessor Real-Time Scheduling with Hierarchical Processor Affinities

    OpenAIRE

    Bonifaci , Vincenzo; Brandenburg , Björn; D'Angelo , Gianlorenzo; Marchetti-Spaccamela , Alberto

    2016-01-01

    International audience; Many multiprocessor real-time operating systems offer the possibility to restrict the migrations of any task to a specified subset of processors by setting affinity masks. A notion of " strong arbitrary processor affinity scheduling " (strong APA scheduling) has been proposed; this notion avoids schedulability losses due to overly simple implementations of processor affinities. Due to potential overheads, strong APA has not been implemented so far in a real-time operat...

  12. 5 CFR 532.207 - Time schedule for wage surveys.

    Science.gov (United States)

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Time schedule for wage surveys. 532.207... PREVAILING RATE SYSTEMS Prevailing Rate Determinations § 532.207 Time schedule for wage surveys. (a) Wage... and the collection of wage data by visits to establishments. (c) A wage-change survey shall be made...

  13. An Experimental Evaluation of Real-Time DVFS Scheduling Algorithms

    OpenAIRE

    Saha, Sonal

    2011-01-01

    Dynamic voltage and frequency scaling (DVFS) is an extensively studied energy manage- ment technique, which aims to reduce the energy consumption of computing platforms by dynamically scaling the CPU frequency. Real-Time DVFS (RT-DVFS) is a branch of DVFS, which reduces CPU energy consumption through DVFS, while at the same time ensures that task time constraints are satisfied by constructing appropriate real-time task schedules. The literature presents numerous RT-DVFS schedul...

  14. Flexible Working and Couples' Coordination of Time Schedules

    OpenAIRE

    Bryan, Mark L.; Sevilla Sanz, Almudena

    2014-01-01

    Using previously unexploited data on time scheduling in the employment and household contexts, we investigate the effect of flexible working on couples' coordination of their daily work time schedules in the UK. We consider three distinct dimensions of flexible working: flexibility of daily start and finish times (flexitime), flexibility of work times over the year (annualised hours), and generalised control of working hours. We find that in couples with flexitime there is greater spouse sync...

  15. Scheduling and Communication Synthesis for Distributed Real-Time Systems

    DEFF Research Database (Denmark)

    Pop, Paul

    2000-01-01

    on aspects of scheduling and communication for embedded real-time systems. Special emphasis has been placed on the impact of the communication infrastructure and protocol on the overall system performance. The scheduling and communication strategies proposed are based on an abstract graph representation...

  16. Static Schedulers for Embedded Real-Time Systems

    Science.gov (United States)

    1989-12-01

    Because of the need for having efficient scheduling algorithms in large scale real time systems , software engineers put a lot of effort on developing...provide static schedulers for he Embedded Real Time Systems with single processor using Ada programming language. The independent nonpreemptable...support the Computer Aided Rapid Prototyping for Embedded Real Time Systems so that we determine whether the system, as designed, meets the required

  17. A decentralized scheduling algorithm for time synchronized channel hopping

    Directory of Open Access Journals (Sweden)

    Andrew Tinka

    2011-09-01

    Full Text Available Time Synchronized Channel Hopping (TSCH is an existing Medium Access Control scheme which enables robust communication through channel hopping and high data rates through synchronization. It is based on a time-slotted architecture, and its correct functioning depends on a schedule which is typically computed by a central node. This paper presents, to our knowledge, the first scheduling algorithm for TSCH networks which both is distributed and which copes with mobile nodes. Two variations on scheduling algorithms are presented. Aloha-based scheduling allocates one channel for broadcasting advertisements for new neighbors. Reservation- based scheduling augments Aloha-based scheduling with a dedicated timeslot for targeted advertisements based on gossip information. A mobile ad hoc motorized sensor network with frequent connectivity changes is studied, and the performance of the two proposed algorithms is assessed. This performance analysis uses both simulation results and the results of a field deployment of floating wireless sensors in an estuarial canal environment. Reservation-based scheduling performs significantly better than Aloha-based scheduling, suggesting that the improved network reactivity is worth the increased algorithmic complexity and resource consumption.

  18. Optimal scheduling of biocide dosing for seawater-cooled power and desalination plants

    KAUST Repository

    Mahfouz, Abdullah Bin

    2011-02-13

    Thermal desalination systems are typically integrated with power plants to exploit the excess heat resulting from the power-generation units. Using seawater in cooling the power plant and the desalination system is a common practice in many parts of the world where there is a shortage of freshwater. Biofouling is one of the major problems associated with the usage of seawater in cooling systems. Because of the dynamic variation in the power and water demands as well as the changes in the characteristics of seawater and the process, there is a need to develop an optimal policy for scheduling biocide usage and cleaning maintenance of the heat exchangers. The objective of this article is to introduce a systematic procedure for the optimization of scheduling the dosing of biocide and dechlorination chemicals as well as cleaning maintenance for a power production/thermal desalination plant. A multi-period optimization formulation is developed and solved to determine: the optimal levels of dosing and dechlorination chemicals; the timing of maintenance to clean the heat-exchange surfaces; and the dynamic dependence of the biofilm growth on the applied doses, the seawater-biocide chemistry, the process conditions, and seawater characteristics for each time period. The technical, economic, and environmental considerations of the system are accounted for. A case study is solved to elucidate the applicability of the developed optimization approach. © 2011 Springer-Verlag.

  19. Rectal cancer delivery of radiotherapy in adequate time and with adequate dose is influenced by treatment center, treatment schedule, and gender and is prognostic parameter for local control: Results of study CAO/ARO/AIO-94

    International Nuclear Information System (INIS)

    Fietkau, Rainer; Roedel, Claus; Hohenberger, Werner; Raab, Rudolf; Hess, Clemens; Liersch, Torsten; Becker, Heinz; Wittekind, Christian; Hutter, Matthias; Hager, Eva; Karstens, Johann; Ewald, Hermann; Christen, Norbert; Jagoditsch, Michael; Martus, Peter; Sauer, Rolf

    2007-01-01

    Purpose: The impact of the delivery of radiotherapy (RT) on treatment results in rectal cancer patients is unknown. Methods and Materials: The data from 788 patients with rectal cancer treated within the German CAO/AIO/ARO-94 phase III trial were analyzed concerning the impact of the delivery of RT (adequate RT: minimal radiation RT dose delivered, 4300 cGy for neoadjuvant RT or 4700 cGy for adjuvant RT; completion of RT in <44 days for neoadjuvant RT or <49 days for adjuvant RT) in different centers on the locoregional recurrence rate (LRR) and disease-free survival (DFS) at 5 years. The LRR, DFS, and delivery of RT were analyzed as endpoints in multivariate analysis. Results: A significant difference was found between the centers and the delivery of RT. The overall delivery of RT was a prognostic factor for the LRR (no RT, 29.6% ± 7.8%; inadequate RT, 21.2% ± 5.6%; adequate RT, 6.8% ± 1.4%; p = 0.0001) and DFS (no RT, 55.1% ± 9.1%; inadequate RT, 57.4% ± 6.3%; adequate RT, 69.1% ± 2.3%; p = 0.02). Postoperatively, delivery of RT was a prognostic factor for LRR on multivariate analysis (together with pathologic stage) but not for DFS (independent parameters, pathologic stage and age). Preoperatively, on multivariate analysis, pathologic stage, but not delivery of RT, was an independent prognostic parameter for LRR and DFS (together with adequate chemotherapy). On multivariate analysis, the treatment center, treatment schedule (neoadjuvant vs. adjuvant RT), and gender were prognostic parameters for adequate RT. Conclusion: Delivery of RT should be regarded as a prognostic factor for LRR in rectal cancer and is influenced by the treatment center, treatment schedule, and patient gender

  20. Distributed Scheduling in Time Dependent Environments: Algorithms and Analysis

    OpenAIRE

    Shmuel, Ori; Cohen, Asaf; Gurewitz, Omer

    2017-01-01

    Consider the problem of a multiple access channel in a time dependent environment with a large number of users. In such a system, mostly due to practical constraints (e.g., decoding complexity), not all users can be scheduled together, and usually only one user may transmit at any given time. Assuming a distributed, opportunistic scheduling algorithm, we analyse the system's properties, such as delay, QoS and capacity scaling laws. Specifically, we start with analyzing the performance while \\...

  1. Real-time Tumor Oxygenation Changes After Single High-dose Radiation Therapy in Orthotopic and Subcutaneous Lung Cancer in Mice: Clinical Implication for Stereotactic Ablative Radiation Therapy Schedule Optimization

    Energy Technology Data Exchange (ETDEWEB)

    Song, Changhoon [Department of Radiation Oncology, Seoul National University College of Medicine, Seoul (Korea, Republic of); Hong, Beom-Ju; Bok, Seoyeon; Lee, Chan-Ju; Kim, Young-Eun [Division of Integrative Biosciences and Biotechnology, Pohang University of Science and Technology, Pohang, Gyeongbuk (Korea, Republic of); Jeon, Sang-Rok [Department of Radiation Oncology, Seoul National University College of Medicine, Seoul (Korea, Republic of); Cancer Research Institute, Seoul National University College of Medicine, Seoul (Korea, Republic of); Wu, Hong-Gyun [Department of Radiation Oncology, Seoul National University College of Medicine, Seoul (Korea, Republic of); Cancer Research Institute, Seoul National University College of Medicine, Seoul (Korea, Republic of); Institute of Radiation Medicine, Medical Research Center, Seoul National University College of Medicine, Seoul (Korea, Republic of); Lee, Yun-Sang [Department of Nuclear Medicine, Seoul National University College of Medicine, Seoul (Korea, Republic of); Department of Molecular Medicine and Biopharmaceutical Sciences, Seoul National University College of Medicine, Seoul (Korea, Republic of); Cheon, Gi Jeong; Paeng, Jin Chul [Cancer Research Institute, Seoul National University College of Medicine, Seoul (Korea, Republic of); Institute of Radiation Medicine, Medical Research Center, Seoul National University College of Medicine, Seoul (Korea, Republic of); Department of Nuclear Medicine, Seoul National University College of Medicine, Seoul (Korea, Republic of); Carlson, David J. [Department of Therapeutic Radiology, Yale University School of Medicine, New Haven, Connecticut (United States); and others

    2016-07-01

    Purpose: To investigate the serial changes of tumor hypoxia in response to single high-dose irradiation by various clinical and preclinical methods to propose an optimal fractionation schedule for stereotactic ablative radiation therapy. Methods and Materials: Syngeneic Lewis lung carcinomas were grown either orthotopically or subcutaneously in C57BL/6 mice and irradiated with a single dose of 15 Gy to mimic stereotactic ablative radiation therapy used in the clinic. Serial [{sup 18}F]-misonidazole (F-MISO) positron emission tomography (PET) imaging, pimonidazole fluorescence-activated cell sorting analyses, hypoxia-responsive element-driven bioluminescence, and Hoechst 33342 perfusion were performed before irradiation (day −1), at 6 hours (day 0), and 2 (day 2) and 6 (day 6) days after irradiation for both subcutaneous and orthotopic lung tumors. For F-MISO, the tumor/brain ratio was analyzed. Results: Hypoxic signals were too low to quantitate for orthotopic tumors using F-MISO PET or hypoxia-responsive element-driven bioluminescence imaging. In subcutaneous tumors, the maximum tumor/brain ratio was 2.87 ± 0.483 at day −1, 1.67 ± 0.116 at day 0, 2.92 ± 0.334 at day 2, and 2.13 ± 0.385 at day 6, indicating that tumor hypoxia was decreased immediately after irradiation and had returned to the pretreatment levels at day 2, followed by a slight decrease by day 6 after radiation. Pimonidazole analysis also revealed similar patterns. Using Hoechst 33342 vascular perfusion dye, CD31, and cleaved caspase 3 co-immunostaining, we found a rapid and transient vascular collapse, which might have resulted in poor intratumor perfusion of F-MISO PET tracer or pimonidazole delivered at day 0, leading to decreased hypoxic signals at day 0 by PET or pimonidazole analyses. Conclusions: We found tumor hypoxia levels decreased immediately after delivery of a single dose of 15 Gy and had returned to the pretreatment levels 2 days after irradiation and had decreased

  2. NEW PATTERNS IN SCHEDULING WORKING TIME

    OpenAIRE

    Claudiu George BOCEAN; Catalina Soriana SITNIKOV

    2010-01-01

    Flexible work arrangements should focus on providing employees with more options for when and how they do their work. Organizations can provide a suite of flexible options to enable employees to choose the arrangements that best balance their work with family and lifestyle preferences. In this paper we intended to investigate the flexibilization process of working time determined by the new trends of work organization. For this purpose, the various aspects of working time in a company were an...

  3. A distributed scheduling algorithm for heterogeneous real-time systems

    Science.gov (United States)

    Zeineldine, Osman; El-Toweissy, Mohamed; Mukkamala, Ravi

    1991-01-01

    Much of the previous work on load balancing and scheduling in distributed environments was concerned with homogeneous systems and homogeneous loads. Several of the results indicated that random policies are as effective as other more complex load allocation policies. The effects of heterogeneity on scheduling algorithms for hard real time systems is examined. A distributed scheduler specifically to handle heterogeneities in both nodes and node traffic is proposed. The performance of the algorithm is measured in terms of the percentage of jobs discarded. While a random task allocation is very sensitive to heterogeneities, the algorithm is shown to be robust to such non-uniformities in system components and load.

  4. Review of time-dose effects in radiation therapy

    International Nuclear Information System (INIS)

    Peschel, R.E.; Fischer, J.J.

    1980-01-01

    A historical review of conventional fractionation offers little confidence that such treatment is optimal for all tumors. Thus manipulation of time-dose schedules may provide a relatively inexpensive yet potentially useful technique for improving therapeutic results in radiation therapy. Consideration of basic radiobiological principles and animal model data illustrates the complex and heterogeneous nature of normal tissue and tumor response to time-dose effects and supports the hypothesis that better time-dose prescriptions can be found in clinical practice. The number of possible time-dose prescriptions is very large, and a review of the clinical trials using nonconventional fractionation demonstrates that the sampled portion of the total three-dimensional space of time, fraction number, and dose has been very small. Only carefully designed clinical trials can establish the therapeutic advantage of a new treatment schedule, and methods for selecting the most promising schedules are discussed. The use of simple data reduction formulas for time-dose effects should be discarded since they ignore the very complexity and heterogeneity of tissues and tumors which may form the basis of improved clinical results

  5. Emergency automatic signalling system using time scheduling

    Science.gov (United States)

    Rayavel, P.; Surenderanath, S.; Rathnavel, P.; Prakash, G.

    2018-04-01

    It is difficult to handle traffic congestion and maintain roads during traffic mainly in India. As the people migrate from rural to urban and sub-urban areas, it becomes still more critical. Presently Roadways is a standout amongst the most vital transportation. At the point when a car crash happens, crisis vehicles, for example, ambulances and fire trucks must rush to the mischance scene. There emerges a situation where a portion of the crisis vehicles may cause another car crash. Therefore it becomes still more difficult for emergency vehicle to reach the destination within a predicted time. To avoid that kind of problem we have come out with an effective idea which can reduce the potential in the traffic system. The traffic system is been modified using a wireless technology and high speed micro controller to provide smooth and clear flow of traffic for ambulance to reach the destination on time. This is achieved by using RFID Tag at the ambulance and RFID Reader at the traffic system i.e., traffic signal. This mainly deals with identifying the emergency vehicle and providing a green signal to traffic signal at time of traffic jam. — By assigning priorities to various traffic movements, we can control the traffic jam. In some moments like ambulance emergency, high delegates arrive people facing lot of trouble. To overcome this problem in this paper we propose a time priority based traffic system achieved by using RFID transmitter at the emergency vehicle and RFID receiver at the traffic system i.e., traffic signal. The signal from the emergency vehicle is sent to traffic system which after detecting it sends it to microcontroller which controls the traffic signal. If any emergency vehicle is detected the system goes to emergency system mode where signal switch to green and if it is not detected normal system mode.

  6. Spinal Cord Doses in Palliative Lung Radiotherapy Schedules

    International Nuclear Information System (INIS)

    Ffrrcsi, F.H.; Parton, C.

    2006-01-01

    Aim: We aim to check the safety of the standard palliative radiotherapy techniques by using the Linear quadratic model for a careful estimation of the doses received by the spinal cord, in all standard palliative lung radiotherapy fields and fractionation. Material and Methods: All patients surveyed at this prospective audit were treated with palliative chest radio-therapy for lung cancer over a period from January to June 2005 by different clinical oncology specialists within the department. Radiotherapy field criteria were recorded and compared with the recommended limits of the MRC trial protocols for the dose and fractionation prescribed. Doses delivered to structures off the field central axis were estimated using a standard CT scan of the chest. Dose estimates were made using an SLPLAN planning system. As unexpected spinal cord toxicity has been reported after hypo fractionated chest radiotherapy, a sagittal view was used to calculate the isodoses along the length of the spinal cord that could lie within the RT field. Equivalent dose estimates are made using the Linear Quadratic Equivalent Dose formula (LQED). The relative radiation sensitivity of spinal cord for myelopathy (the a/b dose) cord has been estimated as a/b = 1 Gy. Results: 17 Gy in 2 fraction and 39 Gy in 13 fraction protocols have spinal cord equivalent doses (using the linear-quadratic model) that lie within the conventional safe limits of 50 Gy in 25 fractions for the 100% isodose. However when the dosimetry is modelled for a 6 MV 100 cm isocentric linac in 3 dimensions, and altered separations and air space inhomogeneity are considered, the D-Max doses consistently fall above this limit on our 3 model patients. Conclusion: The 17 Gy in 2 fraction and 39 Gy in 13 fraction protocol would risk spinal cord damage if the radio therapist was unaware of the potential spinal cord doses. Alterative doses are suggested below 15.5 Gy/ 2 fractions (7 days apart) would be most acceptable

  7. Flexible Scheduling by Deadline Inheritance in Soft Real Time Kernels

    NARCIS (Netherlands)

    Jansen, P.G.; Wygerink, Emiel

    1996-01-01

    Current Hard Real Time (HRT) kernels have their timely behaviour guaranteed on the cost of a rather restrictive use of the available resources. This makes HRT scheduling techniques inadequate for use in Soft Real Time (SRT) environment where we can make a considerable profit by a better and more

  8. Fixed-Time Schedule Effects in Combination with Response-Dependent Schedules

    Science.gov (United States)

    Borrero, John C.; Bartels-Meints, Jamie A.; Sy, Jolene R.; Francisco, Monica T.

    2011-01-01

    We evaluated the effects of fixed-interval (FI), fixed-time (FT), and conjoint (combined) FI FT reinforcement schedules on the responding of 3 adults who had been diagnosed with schizophrenia. Responding on vocational tasks decreased for 2 of 3 participants under FT alone relative to FI alone. Responding under FI FT resulted in response…

  9. Effect of a simple dose-escalation schedule on tramadol tolerability : assessment in the clinical setting.

    Science.gov (United States)

    Tagarro, I; Herrera, J; Barutell, C; Díez, M C; Marín, M; Samper, D; Busquet, C; Rodríguez, M J

    2005-01-01

    To assess the effect of a very simple dose-escalation schedule on tramadol tolerability in clinical practice. This schedule consists of starting treatment with sustained-release tramadol 50mg twice daily, and escalating the dose around 7 days later to 100mg twice daily. Data from 1925 outpatients with non-malignant chronic pain were collected in this multicentre, prospective, comparative, non-randomised, open, observational study. A total of 1071 patients (55.6%) were included in the dose-escalation group (50mg group) and 854 patients (44.4%) in the control group (sustained-release tramadol 100mg twice daily; 100mg group). The proportion of patients who interrupted tramadol treatment due to the occurrence of adverse reactions was significantly lower in the 50mg group (5.6%) than in the 100mg group (12.6%) [p = 0.001]. In line with this, the proportion of patients who experienced at least one adverse reaction was significantly lower in the 50mg group (18.4%) than in the 100mg group (30.4%) [p = 0.001] and, interestingly, the two most frequently reported adverse reactions, nausea and dizziness, were found with a significantly lower frequency in the 50mg group (p < 0.001). Multivariate analysis showed that the risk of safety-related treatment cessations was 2.3 times higher in the 100mg group than in the 50mg group, and 2.2 times higher in females than in males. The two treatments were equally effective in reducing pain intensity (p = 0.121), measured as a reduction in pain score obtained by means of a visual analogue scale. The instauration of tramadol treatment, starting with sustained-release 50mg capsules twice daily and escalating the dose some days later to 100mg twice daily, was shown to be an effective and easy way to improve tramadol tolerability in clinical practice, whilst maintaining its analgesic efficacy.

  10. Optimal Time-Abstract Schedulers for CTMDPs and Markov Games

    Directory of Open Access Journals (Sweden)

    Markus Rabe

    2010-06-01

    Full Text Available We study time-bounded reachability in continuous-time Markov decision processes for time-abstract scheduler classes. Such reachability problems play a paramount role in dependability analysis and the modelling of manufacturing and queueing systems. Consequently, their analysis has been studied intensively, and techniques for the approximation of optimal control are well understood. From a mathematical point of view, however, the question of approximation is secondary compared to the fundamental question whether or not optimal control exists. We demonstrate the existence of optimal schedulers for the time-abstract scheduler classes for all CTMDPs. Our proof is constructive: We show how to compute optimal time-abstract strategies with finite memory. It turns out that these optimal schedulers have an amazingly simple structure---they converge to an easy-to-compute memoryless scheduling policy after a finite number of steps. Finally, we show that our argument can easily be lifted to Markov games: We show that both players have a likewise simple optimal strategy in these more general structures.

  11. Early Mucosal Reactions During and After Head-and-Neck Radiotherapy: Dependence of Treatment Tolerance on Radiation Dose and Schedule Duration

    International Nuclear Information System (INIS)

    Fenwick, John D.; Lawrence, Geoff P.; Malik, Zafar; Nahum, Alan E.; Mayles, W. Philip M.

    2008-01-01

    Purpose: To more precisely localize the dose-time boundary between head-and-neck radiotherapy schedules inducing tolerable and intolerable early mucosal reactions. Methods and Materials: Total cell-kill biologically effective doses (BED CK ) have been calculated for 84 schedules, including incomplete repair effects, but making no other corrections for the effect of schedule duration T. [BED CK ,T] scatterplots are graphed, overlying BED CKboundary (T) curves on the plots and using discriminant analysis to optimize BED CKboundary (T) to best represent the boundary between the tolerable and intolerable schedules. Results: More overlap than expected is seen between the tolerable and intolerable treatments in the 84-schedule [BED CK ,T] scatterplot, but this was largely eliminated by removing gap and tolerated accelerating schedules from the plot. For the remaining 57 predominantly regular schedules, the BED CKboundary (T) boundary increases with increasing T (p = 0.0001), curving upwards significantly nonlinearly (p = 0.00007) and continuing to curve beyond 15 days (p = 0.035). The regular schedule BED CKboundary (T) boundary does not describe tolerability well for accelerating schedules (p = 0.002), with several tolerated accelerating schedules lying above the boundary where regular schedules would be intolerable. Gap schedule tolerability also is not adequately described by the regular schedule boundary (p = 0.04), although no systematic offset exists between the regular boundary and the overall gap schedule tolerability pattern. Conclusions: All schedules analyzed (regular, gap, and accelerating) with BED CK values below BED CKboundary (T)=69.5x(T/32.2)/sin((T/32.2) (radians) )-3.5Gy 10 (forT≤50 days) are tolerable, and many lying above the boundary are intolerable. The accelerating schedules analyzed were tolerated better overall than are the regular schedules with similar [BED CK ,T] values.

  12. On using priced timed automata to achieve optimal scheduling

    DEFF Research Database (Denmark)

    Rasmussen, Jacob Illum; Larsen, Kim Guldstrand; Subramani, K.

    2006-01-01

    This contribution reports on the considerable effort made recently towards extending and applying well-established timed automata technology to optimal scheduling and planning problems. The effort of the authors in this direction has to a large extent been carried out as part of the European proj...... of so-called priced timed automata....

  13. An Improved Scheduling Technique for Time-Triggered Embedded Systems

    DEFF Research Database (Denmark)

    Pop, Paul; Eles, Petru; Peng, Zebo

    1999-01-01

    clock synchronization and mode changes. We have improved the quality of the schedules by introducing a new priority function that takes into consideration the communication protocol. Communication has been optimized through packaging messages into slots with a properly selected order and lengths......In this paper we present an improved scheduling technique for the synthesis of time-triggered embedded systems. Our system model captures both the flow of data and that of control. We have considered communication of data and conditions for a time-triggered protocol implementation that supports...

  14. Time-critical multirate scheduling using contemporary real-time operating system services

    Science.gov (United States)

    Eckhardt, D. E., Jr.

    1983-01-01

    Although real-time operating systems provide many of the task control services necessary to process time-critical applications (i.e., applications with fixed, invariant deadlines), it may still be necessary to provide a scheduling algorithm at a level above the operating system in order to coordinate a set of synchronized, time-critical tasks executing at different cyclic rates. The scheduling requirements for such applications and develops scheduling algorithms using services provided by contemporary real-time operating systems.

  15. Dynamic scheduling and analysis of real time systems with multiprocessors

    Directory of Open Access Journals (Sweden)

    M.D. Nashid Anjum

    2016-08-01

    Full Text Available This research work considers a scenario of cloud computing job-shop scheduling problems. We consider m realtime jobs with various lengths and n machines with different computational speeds and costs. Each job has a deadline to be met, and the profit of processing a packet of a job differs from other jobs. Moreover, considered deadlines are either hard or soft and a penalty is applied if a deadline is missed where the penalty is considered as an exponential function of time. The scheduling problem has been formulated as a mixed integer non-linear programming problem whose objective is to maximize net-profit. The formulated problem is computationally hard and not solvable in deterministic polynomial time. This research work proposes an algorithm named the Tube-tap algorithm as a solution to this scheduling optimization problem. Extensive simulation shows that the proposed algorithm outperforms existing solutions in terms of maximizing net-profit and preserving deadlines.

  16. Comparison of two dose and three dose human papillomavirus vaccine schedules: cost effectiveness analysis based on transmission model.

    Science.gov (United States)

    Jit, Mark; Brisson, Marc; Laprise, Jean-François; Choi, Yoon Hong

    2015-01-06

    To investigate the incremental cost effectiveness of two dose human papillomavirus vaccination and of additionally giving a third dose. Cost effectiveness study based on a transmission dynamic model of human papillomavirus vaccination. Two dose schedules for bivalent or quadrivalent human papillomavirus vaccines were assumed to provide 10, 20, or 30 years' vaccine type protection and cross protection or lifelong vaccine type protection without cross protection. Three dose schedules were assumed to give lifelong vaccine type and cross protection. United Kingdom. Males and females aged 12-74 years. No, two, or three doses of human papillomavirus vaccine given routinely to 12 year old girls, with an initial catch-up campaign to 18 years. Costs (from the healthcare provider's perspective), health related utilities, and incremental cost effectiveness ratios. Giving at least two doses of vaccine seems to be highly cost effective across the entire range of scenarios considered at the quadrivalent vaccine list price of £86.50 (€109.23; $136.00) per dose. If two doses give only 10 years' protection but adding a third dose extends this to lifetime protection, then the third dose also seems to be cost effective at £86.50 per dose (median incremental cost effectiveness ratio £17,000, interquartile range £11,700-£25,800). If two doses protect for more than 20 years, then the third dose will have to be priced substantially lower (median threshold price £31, interquartile range £28-£35) to be cost effective. Results are similar for a bivalent vaccine priced at £80.50 per dose and when the same scenarios are explored by parameterising a Canadian model (HPV-ADVISE) with economic data from the United Kingdom. Two dose human papillomavirus vaccine schedules are likely to be the most cost effective option provided protection lasts for at least 20 years. As the precise duration of two dose schedules may not be known for decades, cohorts given two doses should be closely

  17. Comparison of 2-Dose and 3-Dose 9-Valent Human Papillomavirus Vaccine Schedules in the United States: A Cost-effectiveness Analysis.

    Science.gov (United States)

    Laprise, Jean-François; Markowitz, Lauri E; Chesson, Harrell W; Drolet, Mélanie; Brisson, Marc

    2016-09-01

    A recent clinical trial using the 9-valent human papillomavirus virus (HPV) vaccine has shown that antibody responses after 2 doses are noninferior to those after 3 doses, suggesting that 2 and 3 doses may have comparable vaccine efficacy. We used an individual-based transmission-dynamic model to compare the population-level effectiveness and cost-effectiveness of 2- and 3-dose schedules of 9-valent HPV vaccine in the United States. Our model predicts that if 2 doses of 9-valent vaccine protect for ≥20 years, the additional benefits of a 3-dose schedule are small as compared to those of 2-dose schedules, and 2-dose schedules are likely much more cost-efficient than 3-dose schedules. © The Author 2016. Published by Oxford University Press for the Infectious Diseases Society of America. All rights reserved. For permissions, e-mail journals.permissions@oup.com.

  18. Time-constrained project scheduling with adjacent resources

    NARCIS (Netherlands)

    Hurink, Johann L.; Kok, A.L.; Paulus, J.J.; Schutten, Johannes M.J.

    We develop a decomposition method for the Time-Constrained Project Scheduling Problem (TCPSP) with adjacent resources. For adjacent resources the resource units are ordered and the units assigned to a job have to be adjacent. On top of that, adjacent resources are not required by single jobs, but by

  19. 41 CFR 101-26.507-2 - Procurement time schedule.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Procurement time schedule. 101-26.507-2 Section 101-26.507-2 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND...

  20. 41 CFR 101-26.501-5 - Procurement time schedules.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Procurement time schedules. 101-26.501-5 Section 101-26.501-5 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT...

  1. Scheduling with Optimized Communication for Time-Triggered Embedded Systems

    DEFF Research Database (Denmark)

    Pop, Paul; Eles, Petru; Peng, Zebo

    1999-01-01

    We present an approach to process scheduling for synthesis of safety-critical distributed embedded systems.Our system model captures both the flow of data and that of control. The communication model is based on a time-triggered protocol. We take into consideration overheads due to communication...

  2. Time-constrained project scheduling with adjacent resources

    NARCIS (Netherlands)

    Hurink, Johann L.; Kok, A.L.; Paulus, J.J.; Schutten, Johannes M.J.

    2008-01-01

    We develop a decomposition method for the Time-Constrained Project Scheduling Problem (TCPSP) with Adjacent Resources. For adjacent resources the resource units are ordered and the units assigned to a job have to be adjacent. On top of that, adjacent resources are not required by single jobs, but by

  3. Assessing the Predictability of Scheduled-Vehicle Travel Times

    DEFF Research Database (Denmark)

    Tiesyte, Dalia; Jensen, Christian Søndergaard

    2009-01-01

    One of the most desired and challenging services in collective transport systems is the real-time prediction of the near-future travel times of scheduled vehicles, especially public buses, thus improving the experience of the transportation users, who may be able to better schedule their travel......, and also enabling system operators to perform real-time monitoring. While travel-time prediction has been researched extensively during the past decade, the accuracies of existing techniques fall short of what is desired, and proposed mathematical prediction models are often not transferable to other...... systems because the properties of the travel-time-related data of vehicles are highly context-dependent, making the models difficult to fit. We propose a framework for evaluating various predictability types of the data independently of the model, and we also compare predictability analysis results...

  4. Coordinated scheduling for dynamic real-time systems

    Science.gov (United States)

    Natarajan, Swaminathan; Zhao, Wei

    1994-01-01

    In this project, we addressed issues in coordinated scheduling for dynamic real-time systems. In particular, we concentrated on design and implementation of a new distributed real-time system called R-Shell. The design objective of R-Shell is to provide computing support for space programs that have large, complex, fault-tolerant distributed real-time applications. In R-shell, the approach is based on the concept of scheduling agents, which reside in the application run-time environment, and are customized to provide just those resource management functions which are needed by the specific application. With this approach, we avoid the need for a sophisticated OS which provides a variety of generalized functionality, while still not burdening application programmers with heavy responsibility for resource management. In this report, we discuss the R-Shell approach, summarize the achievement of the project, and describe a preliminary prototype of R-Shell system.

  5. Resource-Optimal Scheduling Using Priced Timed Automata

    DEFF Research Database (Denmark)

    Larsen, Kim Guldstrand; Rasmussen, Jacob Illum; Subramani, K.

    2004-01-01

    In this paper, we show how the simple structure of the linear programs encountered during symbolic minimum-cost reachability analysis of priced timed automata can be exploited in order to substantially improve the performance of the current algorithm. The idea is rooted in duality of linear......-80 percent performance gain. As a main application area, we show how to solve energy-optimal task graph scheduling problems using the framework of priced timed automata....

  6. Integrated project scheduling and staff assignment with controllable processing times.

    Science.gov (United States)

    Fernandez-Viagas, Victor; Framinan, Jose M

    2014-01-01

    This paper addresses a decision problem related to simultaneously scheduling the tasks in a project and assigning the staff to these tasks, taking into account that a task can be performed only by employees with certain skills, and that the length of each task depends on the number of employees assigned. This type of problems usually appears in service companies, where both tasks scheduling and staff assignment are closely related. An integer programming model for the problem is proposed, together with some extensions to cope with different situations. Additionally, the advantages of the controllable processing times approach are compared with the fixed processing times. Due to the complexity of the integrated model, a simple GRASP algorithm is implemented in order to obtain good, approximate solutions in short computation times.

  7. Integrated Project Scheduling and Staff Assignment with Controllable Processing Times

    Directory of Open Access Journals (Sweden)

    Victor Fernandez-Viagas

    2014-01-01

    Full Text Available This paper addresses a decision problem related to simultaneously scheduling the tasks in a project and assigning the staff to these tasks, taking into account that a task can be performed only by employees with certain skills, and that the length of each task depends on the number of employees assigned. This type of problems usually appears in service companies, where both tasks scheduling and staff assignment are closely related. An integer programming model for the problem is proposed, together with some extensions to cope with different situations. Additionally, the advantages of the controllable processing times approach are compared with the fixed processing times. Due to the complexity of the integrated model, a simple GRASP algorithm is implemented in order to obtain good, approximate solutions in short computation times.

  8. Optimal treatment scheduling of ionizing radiation and sunitinib improves the antitumor activity and allows dose reduction

    International Nuclear Information System (INIS)

    Kleibeuker, Esther A; Hooven, Matthijs A ten; Castricum, Kitty C; Honeywell, Richard; Griffioen, Arjan W; Verheul, Henk M; Slotman, Ben J; Thijssen, Victor L

    2015-01-01

    The combination of radiotherapy with sunitinib is clinically hampered by rare but severe side effects and varying results with respect to clinical benefit. We studied different scheduling regimes and dose reduction in sunitinib and radiotherapy in preclinical tumor models to improve potential outcome of this combination treatment strategy. The chicken chorioallantoic membrane (CAM) was used as an angiogenesis in vivo model and as a xenograft model with human tumor cells (HT29 colorectal adenocarcinoma, OE19 esophageal adenocarcinoma). Treatment consisted of ionizing radiation (IR) and sunitinib as single therapy or in combination, using different dose-scheduling regimes. Sunitinib potentiated the inhibitory effect of IR (4 Gy) on angiogenesis. In addition, IR (4 Gy) and sunitinib (4 days of 32.5 mg/kg per day) inhibited tumor growth. Ionizing radiation induced tumor cell apoptosis and reduced proliferation, whereas sunitinib decreased tumor angiogenesis and reduced tumor cell proliferation. When IR was applied before sunitinib, this almost completely inhibited tumor growth, whereas concurrent IR was less effective and IR after sunitinib had no additional effect on tumor growth. Moreover, optimal scheduling allowed a 50% dose reduction in sunitinib while maintaining comparable antitumor effects. This study shows that the therapeutic efficacy of combination therapy improves when proper dose-scheduling is applied. More importantly, optimal treatment regimes permit dose reductions in the angiogenesis inhibitor, which will likely reduce the side effects of combination therapy in the clinical setting. Our study provides important leads to optimize combination treatment in the clinical setting

  9. A consideration of distributions and treatment schedules in high dose rate intracavitary therapy of carcinoma of the uterine cervix

    International Nuclear Information System (INIS)

    Sakata, Suoh; Sato, Sigehiro; Nakano, Masao; Iida, Koyo; Yui, Nobuharu

    1979-01-01

    A remotely controlled afterloading device for high dose rate intracavitary radiation, the remote afterloader Shimadzu Ralstron MTSW-20, was installed at Chiba Cancer Center Hospital in 1973 and put into clinical use for the treatment of carcinoma of the uterine cervix. Before the clinical use, isodose distributions and treatment schedules were investigated, compared with the low dose rate intracavitary radiation by linear sources of 137 Cs used hitherto. The isodose distributions, calculated by using an electronic computer, for various combinations of the length of uterine canal and the separation of vaginal applicators, were the same as those obtained with linear sources. As for the treatment schedules, by using PT (partial tolerance) which was derived from NSD concept of Ellis, a number of fractional radiation regimes with high dose rate, equivalent to continuous low dose rate radiation, was calculated. From these, a dose of 600 rad per fraction to point A every week has been chosen as the standard radiation schedule. The number of fractions has been varied with the clinical stages. Furthermore, some changes of total dose or small modification of dose distribution have been made for individual lesions. According to the preliminary results, three-year cumulative survival rate was 68.7% and complication rate was 15.2%. Comparing these results with those of the treatment at low dose rate, the former is nearly equal, while the latter is lower. The reduction of complication rate is probably due to the improvement of therapeutic techniques such as continuous observation by fractionated intracavitary radiation, variety of isodose distributions and accuracy of source placement by a short treatment time. (author)

  10. Immunogenicity to poliovirus type 2 following two doses of fractional intradermal inactivated poliovirus vaccine: A novel dose sparing immunization schedule.

    Science.gov (United States)

    Anand, Abhijeet; Molodecky, Natalie A; Pallansch, Mark A; Sutter, Roland W

    2017-05-19

    The polio eradication endgame strategic plan calls for the sequential removal of Sabin poliovirus serotypes from the trivalent oral poliovirus vaccine (tOPV), starting with type 2, and the introduction of ≥1 dose of inactivated poliovirus vaccine (IPV), to maintain an immunity base against poliovirus type 2. The global removal of oral poliovirus type 2 was successfully implemented in May 2016. However, IPV supply constraints has prevented introduction in 21 countries and led to complete stock-out in >20 countries. We conducted a literature review and contacted corresponding authors of recent studies with fractional-dose IPV (fIPV), one-fifth of intramuscular dose administered intradermally, to conduct additional type 2 immunogenicity analyses of two fIPV doses compared with one full-dose IPV. Four studies were identified that assessed immunogenicity of two fIPV doses compared to one full-dose IPV. Two fractional doses are more immunogenic than 1 full-dose, with type 2 seroconversion rates improving between absolute 19-42% (median: 37%, pvaccine compared to one full-dose IPV. In response to the current IPV shortage, a schedule of two fIPV doses at ages 6 and 14weekshas been endorsed by technical oversight committees and has been introduced in some affected countries. Copyright © 2017. Published by Elsevier Ltd.

  11. SURVEY - Multicriteria Models for Just-in-Time Scheduling

    OpenAIRE

    T'Kindt , Vincent

    2010-01-01

    Abstract Just-in-Time manufacturing consists in organizing the production of elements in order to meet a certain number of objectives or requirements according to the so-called ?Just-in-Time philosophy?. Just-in-Time has been extensively studied in the literature for many years due to the high number of real-life situations where it can be applied. This paper aims at revisiting Just-in-Time principles and detailing how they can be applied to the scheduling stage of a manufacturi...

  12. Systematic literature review comparing rapid 3-dose administration of the GSK tick-borne encephalitis vaccine with other primary immunization schedules.

    Science.gov (United States)

    Galgani, Ilaria; Bunge, Eveline M; Hendriks, Lisa; Schludermann, Christopher; Marano, Cinzia; De Moerlooze, Laurence

    2017-09-01

    Tick-borne encephalitis (TBE), which is endemic across large regions of Europe and Asia, is most effectively prevented through vaccination. Three-dose primary TBE vaccination schedules are either rapid (0,7,21-days) or conventional (0,28-84-days, 9-12-months). The second dose can also be administered at 14 days for faster priming and sero-protection). Areas covered: We used a three-step selection process to identify 21 publications comparing the immunogenicity and/or safety of different schedules. Expert commentary: Priming with two or three TBE vaccine doses was highly immunogenic. After conventional priming (0-28 days), 95% adults and ≥95% children had neutralization test (NT) titers ≥10 at 14 days post-dose-2 compared with 92% adults and 99% children at 21 days post-dose-3 (rapid schedule). Most subjects retained NT titers ≥10 at day 300. A single booster dose induced a strong immune response in all subjects irrespective of primary vaccination schedule or elapsed time since priming. GMT peaked at 42 days post-dose-1 (i.e., 21 days post-dose 3 [rapid-schedule], or 14-28 days post-dose-2 [conventional-schedule]), and declined thereafter. Adverse events were generally rare and declined with increasing doses. In the absence of data to recommend one particular schedule, the regimen choice will remain at the physician's discretion, based on patient constraints and availability.

  13. Neural Feedback Scheduling of Real-Time Control Tasks

    OpenAIRE

    Xia, Feng; Tian, Yu-Chu; Sun, Youxian; Dong, Jinxiang

    2008-01-01

    Many embedded real-time control systems suffer from resource constraints and dynamic workload variations. Although optimal feedback scheduling schemes are in principle capable of maximizing the overall control performance of multitasking control systems, most of them induce excessively large computational overheads associated with the mathematical optimization routines involved and hence are not directly applicable to practical systems. To optimize the overall control performance while minimi...

  14. Selection and scheduling of jobs with time-dependent duration

    OpenAIRE

    DM Seegmuller; SE Visagie; HC de Kock; WJ Pienaar

    2007-01-01

    In this paper two mathematical programming models, both with multiple objective functions, are proposed to solve four related categories of job scheduling problems. All four of these categories have the property that the duration of the jobs is dependent on the time of implementation and in some cases the preceding job. Furthermore, some jobs (restricted to subsets of the total pool of jobs) can, to different extents, run in parallel. In addition, not all the jobs need necessarily be implemen...

  15. Segment Fixed Priority Scheduling for Self Suspending Real Time Tasks

    Science.gov (United States)

    2016-08-11

    a compute- intensive system such as a self - driving car that we have recently developed [28]. Such systems run computation-demanding algorithms...Applications. In RTSS, 2012. [12] J. Kim et al. Parallel Scheduling for Cyber-Physical Systems: Analysis and Case Study on a Self - Driving Car . In ICCPS...leveraging GPU can be modeled using a multi-segment self -suspending real-time task model. For example, a planning algorithm for autonomous driving can

  16. Time and Identity: Socializing Schedules and the Implications for Community

    OpenAIRE

    Kattan, Shlomy

    2008-01-01

    This article analyzes data collected as part of an ethnography of three families of Israeli emissaries (shlichim) in order to explore the relationship between the individual, the schedules to which s/he adheres, and her/his affiliation with a particular collective. The paper examines the relationship between time, community, and self through a discourse analytic lens that draws on approaches to the study of cultural identity which look to tension as definitive of groups and their members. It ...

  17. Time while waiting: patients' experiences of scheduled surgery.

    Science.gov (United States)

    Carr, Tracey; Teucher, Ulrich C; Casson, Alan G

    2014-12-01

    Research on patients' experiences of wait time for scheduled surgery has centered predominantly on the relative tolerability of perceived wait time and impacts on quality of life. We explored patients' experiences of time while waiting for three types of surgery with varied wait times--hip or knee replacement, shoulder surgery, and cardiac surgery. Thirty-two patients were recruited by their surgeons. We asked participants about their perceptions of time while waiting in two separate interviews. Using interpretative phenomenological analysis (IPA), we discovered connections between participant suffering, meaningfulness of time, and agency over the waiting period and the lived duration of time experience. Our findings reveal that chronological duration is not necessarily the most relevant consideration in determining the quality of waiting experience. Those findings helped us create a conceptual framework for lived wait time. We suggest that clinicians and policy makers consider the complexity of wait time experience to enhance preoperative patient care. © The Author(s) 2014.

  18. Mathematical modeling identifies optimum lapatinib dosing schedules for the treatment of glioblastoma patients.

    Directory of Open Access Journals (Sweden)

    Shayna Stein

    2018-01-01

    Full Text Available Human primary glioblastomas (GBM often harbor mutations within the epidermal growth factor receptor (EGFR. Treatment of EGFR-mutant GBM cell lines with the EGFR/HER2 tyrosine kinase inhibitor lapatinib can effectively induce cell death in these models. However, EGFR inhibitors have shown little efficacy in the clinic, partly because of inappropriate dosing. Here, we developed a computational approach to model the in vitro cellular dynamics of the EGFR-mutant cell line SF268 in response to different lapatinib concentrations and dosing schedules. We then used this approach to identify an effective treatment strategy within the clinical toxicity limits of lapatinib, and developed a partial differential equation modeling approach to study the in vivo GBM treatment response by taking into account the heterogeneous and diffusive nature of the disease. Despite the inability of lapatinib to induce tumor regressions with a continuous daily schedule, our modeling approach consistently predicts that continuous dosing remains the best clinically feasible strategy for slowing down tumor growth and lowering overall tumor burden, compared to pulsatile schedules currently known to be tolerated, even when considering drug resistance, reduced lapatinib tumor concentrations due to the blood brain barrier, and the phenotypic switch from proliferative to migratory cell phenotypes that occurs in hypoxic microenvironments. Our mathematical modeling and statistical analysis platform provides a rational method for comparing treatment schedules in search for optimal dosing strategies for glioblastoma and other cancer types.

  19. Computation and evaluation of scheduled waiting time for railway networks

    DEFF Research Database (Denmark)

    Landex, Alex

    2010-01-01

    Timetables are affected by scheduled waiting time (SWT) that prolongs the travel times for trains and thereby passengers. SWT occurs when a train hinders another train to run with the wanted speed. The SWT affects both the trains and the passengers in the trains. The passengers may be further...... affected due to longer transfer times to other trains. SWT can be estimated analytically for a given timetable or by simulation of timetables and/or plans of operation. The simulation of SWT has the benefit that it is possible to examine the entire network. This makes it possible to improve the future...

  20. Duration of protection against hepatitis A for the current two-dose vaccine compared to a three-dose vaccine schedule in children

    Science.gov (United States)

    Raczniak, Gregory A.; Thomas, Timothy K.; Bulkow, Lisa R.; Negus, Susan E.; Zanis, Carolyn L.; Bruce, Michael G.; Spradling, Philip R.; Teshale, Eyasu H.; McMahon, Brian J.

    2015-01-01

    Background Hepatitis A is mostly a self-limiting disease but causes substantial economic burden. Consequently, United States Advisory Committee for Immunization Practices recommends inactivated hepatitis A vaccination for all children beginning at age 1 year and for high risk adults. The hepatitis A vaccine is highly effective but the duration of protection is unknown. Methods We examined the proportion of children with protective hepatitis A antibody levels (anti-HAV ≥20 mIU/mL) as well as the geometric mean concentration (GMC) of anti-HAV in a cross sectional convenience sample of individuals aged 12–24 years, who had been vaccinated with a two-dose schedule in childhood, with the initial dose at least 5 years ago. We compared a subset of data from persons vaccinated with two-doses (720 EL.U.) at age 3–6 years with a demographically similar prospective cohort that received a three-dose (360 EL.U.) schedule and have been followed for 17 years. Results No significant differences were observed when comparing GMC between the two cohorts at 10 (P = 0.467), 12 (P = 0.496), and 14 (P = 0.175) years post-immunization. For the three-dose cohort, protective antibody levels remain for 17 years and have leveled-off over the past 7 years. Conclusion The two- and three-dose schedules provide similar protection >14 years after vaccination, indicating a booster dose is not needed at this time. Plateauing anti-HAV GMC levels suggest protective antibody levels may persist long-term. PMID:23470239

  1. Selection and scheduling of jobs with time-dependent duration

    Directory of Open Access Journals (Sweden)

    DM Seegmuller

    2007-06-01

    Full Text Available In this paper two mathematical programming models, both with multiple objective functions, are proposed to solve four related categories of job scheduling problems. All four of these categories have the property that the duration of the jobs is dependent on the time of implementation and in some cases the preceding job. Furthermore, some jobs (restricted to subsets of the total pool of jobs can, to different extents, run in parallel. In addition, not all the jobs need necessarily be implemented during the given time period.

  2. Real-time control systems: feedback, scheduling and robustness

    Science.gov (United States)

    Simon, Daniel; Seuret, Alexandre; Sename, Olivier

    2017-08-01

    The efficient control of real-time distributed systems, where continuous components are governed through digital devices and communication networks, needs a careful examination of the constraints arising from the different involved domains inside co-design approaches. Thanks to the robustness of feedback control, both new control methodologies and slackened real-time scheduling schemes are proposed beyond the frontiers between these traditionally separated fields. A methodology to design robust aperiodic controllers is provided, where the sampling interval is considered as a control variable of the system. Promising experimental results are provided to show the feasibility and robustness of the approach.

  3. Comparison between linear quadratic and early time dose models

    International Nuclear Information System (INIS)

    Chougule, A.A.; Supe, S.J.

    1993-01-01

    During the 70s, much interest was focused on fractionation in radiotherapy with the aim of improving tumor control rate without producing unacceptable normal tissue damage. To compare the radiobiological effectiveness of various fractionation schedules, empirical formulae such as Nominal Standard Dose, Time Dose Factor, Cumulative Radiation Effect and Tumour Significant Dose, were introduced and were used despite many shortcomings. It has been claimed that a recent linear quadratic model is able to predict the radiobiological responses of tumours as well as normal tissues more accurately. We compared Time Dose Factor and Tumour Significant Dose models with the linear quadratic model for tumour regression in patients with carcinomas of the cervix. It was observed that the prediction of tumour regression estimated by the Tumour Significant Dose and Time Dose factor concepts varied by 1.6% from that of the linear quadratic model prediction. In view of the lack of knowledge of the precise values of the parameters of the linear quadratic model, it should be applied with caution. One can continue to use the Time Dose Factor concept which has been in use for more than a decade as its results are within ±2% as compared to that predicted by the linear quadratic model. (author). 11 refs., 3 figs., 4 tabs

  4. Prognostic relevance of sunitinib toxicities and comparison of continuous vs. intermittent sunitinib dosing schedule in metastatic renal cell cancer patients

    Directory of Open Access Journals (Sweden)

    Çetin Ordu

    2016-06-01

    Full Text Available Aim of the study : Sunitinib-related side effects may develop as a result of the pharmacokinetic pathway affects the of the drug. Material and methods : Data on mRCC patients were obtained from the hospital archives. Outcomes of patients were evaluated in terms of related prognostic factors, sunitinib adverse events during the treatment, and two different sunitinib dosing schedules. Results : Seventy patients diagnosed with mRCC and treated with sunitinib were analyzed for prognostic factors and survival rates. During the mean follow-up of 33.5 months, 38 (54% patients were alive and 32 (46% patients died. The median time of overall survival (OS and progression-free survival (PFS was 27 months (12–61 and 19 months (5–45, respectively. In univariate analysis, good prognostic risk group according to the Memorial Sloan-Kettering Cancer Center (MSKCC, hypothyroidism as sunitinib toxicity and patients on sunitinib treatment more than 1 year were favorable prognostic factors for OS. Leukopenia and fatigue as sunitinib toxicity were poor prognostic factors for OS. PFS and OS of the patients were not significantly different when we compared intermittent (4/2 vs. continuous treatment dosing schedules. Conclusions : As a result of this trial, having hypothyroidism as an adverse effect of sunitinib was a favorable prognostic factor for OS and PFS in mRCC patients. It was also found that 4/2 and continuous dosing schedules of sunitinib did not give rise to different outcomes in mRCC patients.

  5. Enhanced round robin CPU scheduling with burst time based time quantum

    Science.gov (United States)

    Indusree, J. R.; Prabadevi, B.

    2017-11-01

    Process scheduling is a very important functionality of Operating system. The main-known process-scheduling algorithms are First Come First Serve (FCFS) algorithm, Round Robin (RR) algorithm, Priority scheduling algorithm and Shortest Job First (SJF) algorithm. Compared to its peers, Round Robin (RR) algorithm has the advantage that it gives fair share of CPU to the processes which are already in the ready-queue. The effectiveness of the RR algorithm greatly depends on chosen time quantum value. Through this research paper, we are proposing an enhanced algorithm called Enhanced Round Robin with Burst-time based Time Quantum (ERRBTQ) process scheduling algorithm which calculates time quantum as per the burst-time of processes already in ready queue. The experimental results and analysis of ERRBTQ algorithm clearly indicates the improved performance when compared with conventional RR and its variants.

  6. Improved SIRAP analysis for synchronization in hierarchical scheduled real-time systems

    NARCIS (Netherlands)

    Behnam, M.; Bril, R.J.; Nolte, T.

    2009-01-01

    We present our ongoing work on synchronization in hierarchical scheduled real-time systems, where tasks are scheduled using fixed-priority pre-emptive scheduling. In this paper, we show that the original local schedulability analysis of the synchronization protocol SIRAP [4] is very pessimistic when

  7. Non-clairvoyant weighted flow time scheduling with rejection penalty

    DEFF Research Database (Denmark)

    Chan, Ho-Leung; Chan, Sze-Hang; Lam, Tak-Wah

    2012-01-01

    is defined as the weighted flow time of the job plus the penalty if it is rejected before completion. Previous work on minimizing the total user cost focused on the clairvoyant single-processor setting [BBC+03,CLL11] and has produced O(1)-competitive online algorithm for jobs with arbitrary weights...... algorithm has to decide job rejection and determine the order and speed of job execution. It is interesting to study the tradeoff between the above-mentioned user cost and energy. This paper gives two O(1)-competitive non-clairvoyant algorithms for minimizing the user cost plus energy on a single processor......This paper initiates the study of online scheduling with rejection penalty in the non-clairvoyant setting, i.e., the size (processing time) of a job is not assumed to be known at its release time. In the rejection penalty model, jobs can be rejected with a penalty, and the user cost of a job...

  8. How travellers’ schedule their trips under uncertain travel times

    DEFF Research Database (Denmark)

    Hjorth, Katrine

    Travel times play an important role when people decide where, when and how much to travel. But travel times are not always predictable from the traveller’s point of view: They may vary from day to day due to demand fluctuations, weather conditions, accidents and other unforeseen events that cause...... road capacity to decrease. We refer to this uncertainty as travel time variability (TTV). TTV is likely to affect how travellers schedule their trips, since it affects their probability of arriving late at their destination. We would like to account for TTV in traffic models and cost-benefit analyses......, but in practice there are limits to the kinds of behaviour that can be accommodated in such applications. For that reason, we are not solely interested in explaining travellers’ behaviour, but also in whether this behaviour can be approximated by behavioural models that are simple enough to be applied in traffic...

  9. Medium-dose-rate brachytherapy of cancer of the cervix: preliminary results of a prospectively designed schedule based on the linear-quadratic model

    International Nuclear Information System (INIS)

    Leborgne, Felix; Fowler, Jack F.; Leborgne, Jose H.; Zubizarreta, Eduardo; Curochquin, Rene

    1999-01-01

    Purpose: To compare results and complications of our previous low-dose-rate (LDR) brachytherapy schedule for early-stage cancer of the cervix, with a prospectively designed medium-dose-rate (MDR) schedule, based on the linear-quadratic model (LQ). Methods and Materials: A combination of brachytherapy, external beam pelvic and parametrial irradiation was used in 102 consecutive Stage Ib-IIb LDR treated patients (1986-1990) and 42 equally staged MDR treated patients (1994-1996). The planned MDR schedule consisted of three insertions on three treatment days with six 8-Gy brachytherapy fractions to Point A, two on each treatment day with an interfraction interval of 6 hours, plus 18 Gy external whole pelvic dose, and followed by additional parametrial irradiation. The calculated biologically effective dose (BED) for tumor was 90 Gy 10 and for rectum below 125 Gy 3 . Results: In practice the MDR brachytherapy schedule achieved a tumor BED of 86 Gy 10 and a rectal BED of 101 Gy 3 . The latter was better than originally planned due to a reduction from 85% to 77% in the percentage of the mean dose to the rectum in relation to Point A. The mean overall treatment time was 10 days shorter for MDR in comparison with LDR. The 3-year actuarial central control for LDR and MDR was 97% and 98% (p = NS), respectively. The Grades 2 and 3 late complications (scale 0 to 3) were 1% and 2.4%, respectively for LDR (3-year) and MDR (2-year). Conclusions: LQ is a reliable tool for designing new schedules with altered fractionation and dose rates. The MDR schedule has proven to be an equivalent treatment schedule compared with LDR, with an additional advantage of having a shorter overall treatment time. The mean rectal BED Gy 3 was lower than expected

  10. Compilation time analysis to minimize run-time overhead in preemptive scheduling on multiprocessors

    Science.gov (United States)

    Wauters, Piet; Lauwereins, Rudy; Peperstraete, J.

    1994-10-01

    This paper describes a scheduling method for hard real-time Digital Signal Processing (DSP) applications, implemented on a multi-processor. Due to the very high operating frequencies of DSP applications (typically hundreds of kHz) runtime overhead should be kept as small as possible. Because static scheduling introduces very little run-time overhead it is used as much as possible. Dynamic pre-emption of tasks is allowed if and only if it leads to better performance in spite of the extra run-time overhead. We essentially combine static scheduling with dynamic pre-emption using static priorities. Since we are dealing with hard real-time applications we must be able to guarantee at compile-time that all timing requirements will be satisfied at run-time. We will show that our method performs at least as good as any static scheduling method. It also reduces the total amount of dynamic pre-emptions compared with run time methods like deadline monotonic scheduling.

  11. Preoperative chemoradiation for locally advanced rectal cancer: comparison of three radiation dose and fractionation schedules

    International Nuclear Information System (INIS)

    Park, Shin Hyung; Kim, Jae Chul

    2016-01-01

    The standard radiation dose for patients with locally rectal cancer treated with preoperative chemoradiotherapy is 45–50 Gy in 25–28 fractions. We aimed to assess whether a difference exists within this dose fractionation range. A retrospective analysis was performed to compare three dose fractionation schedules. Patients received 50 Gy in 25 fractions (group A), 50.4 Gy in 28 fractions (group B), or 45 Gy in 25 fractions (group C) to the whole pelvis, as well as concurrent 5-fluorouracil. Radical resection was scheduled for 8 weeks after concurrent chemoradiotherapy. Between September 2010 and August 2013, 175 patients were treated with preoperative chemoradiotherapy at our institution. Among those patients, 154 were eligible for analysis (55, 50, and 49 patients in groups A, B, and C, respectively). After the median follow-up period of 29 months (range, 5 to 48 months), no differences were found between the 3 groups regarding pathologic complete remission rate, tumor regression grade, treatment-related toxicity, 2-year locoregional recurrence-free survival, distant metastasis-free survival, disease-free survival, or overall survival. The circumferential resection margin width was a prognostic factor for 2-year locoregional recurrence-free survival, whereas ypN category was associated with distant metastasis-free survival, disease-free survival, and overall survival. High tumor regression grading score was correlated with 2-year distant metastasis-free survival and disease-free survival in univariate analysis. Three different radiation dose fractionation schedules, within the dose range recommended by the National Comprehensive Cancer Network, had no impact on pathologic tumor regression and early clinical outcome for locally advanced rectal cancer

  12. Preoperative chemoradiation for locally advanced rectal cancer: comparison of three radiation dose and fractionation schedules

    Energy Technology Data Exchange (ETDEWEB)

    Park, Shin Hyung; Kim, Jae Chul [Dept. of Radiation Oncology, Kyungpook National University School of Medicine, Daegu (Korea, Republic of)

    2016-06-15

    The standard radiation dose for patients with locally rectal cancer treated with preoperative chemoradiotherapy is 45–50 Gy in 25–28 fractions. We aimed to assess whether a difference exists within this dose fractionation range. A retrospective analysis was performed to compare three dose fractionation schedules. Patients received 50 Gy in 25 fractions (group A), 50.4 Gy in 28 fractions (group B), or 45 Gy in 25 fractions (group C) to the whole pelvis, as well as concurrent 5-fluorouracil. Radical resection was scheduled for 8 weeks after concurrent chemoradiotherapy. Between September 2010 and August 2013, 175 patients were treated with preoperative chemoradiotherapy at our institution. Among those patients, 154 were eligible for analysis (55, 50, and 49 patients in groups A, B, and C, respectively). After the median follow-up period of 29 months (range, 5 to 48 months), no differences were found between the 3 groups regarding pathologic complete remission rate, tumor regression grade, treatment-related toxicity, 2-year locoregional recurrence-free survival, distant metastasis-free survival, disease-free survival, or overall survival. The circumferential resection margin width was a prognostic factor for 2-year locoregional recurrence-free survival, whereas ypN category was associated with distant metastasis-free survival, disease-free survival, and overall survival. High tumor regression grading score was correlated with 2-year distant metastasis-free survival and disease-free survival in univariate analysis. Three different radiation dose fractionation schedules, within the dose range recommended by the National Comprehensive Cancer Network, had no impact on pathologic tumor regression and early clinical outcome for locally advanced rectal cancer.

  13. Real-time disk scheduling in a mixed-media file system

    NARCIS (Netherlands)

    Bosch, H.G.P.; Mullender, Sape J.

    2000-01-01

    This paper presents our real-time disk scheduler called the Delta L scheduler, which optimizes unscheduled best-effort disk requests by giving priority to best-effort disk requests while meeting real-time request deadlines. Our scheduler tries to execute real-time disk requests as much as possible

  14. Real-Time Disk Scheduling in a Mixed-Media File System

    NARCIS (Netherlands)

    Bosch, H.G.P.; Mullender, Sape J.

    2000-01-01

    This paper presents our real-time disk scheduler called the L scheduler, which optimizes unscheduled best-effort disk requests by giving priority to best-effort disk requests while meeting real-time request deadlines. Our scheduler tries to execute real-time disk requests as much as possible in the

  15. Optimizing the dosing schedule of l-asparaginase improves its anti-tumor activity in breast tumor-bearing mice

    Directory of Open Access Journals (Sweden)

    Shoya Shiromizu

    2018-04-01

    Full Text Available Proliferation of acute lymphoblastic leukemic cells is nutritionally dependent on the external supply of asparagine. l-asparaginase, an enzyme hydrolyzing l-asparagine in blood, is used for treatment of acute lymphoblastic leukemic and other related blood cancers. Although previous studies demonstrated that l-asparaginase suppresses the proliferation of cultured solid tumor cells, it remains unclear whether this enzyme prevents the growth of solid tumors in vivo. In this study, we demonstrated the importance of optimizing dosing schedules for the anti-tumor activity of l-asparaginase in 4T1 breast tumor-bearing mice. Cultures of several types of murine solid tumor cells were dependent on the external supply of asparagine. Among them, we selected murine 4T1 breast cancer cells and implanted them into BALB/c female mice kept under standardized light/dark cycle conditions. The growth of 4T1 tumor cells implanted in mice was significantly suppressed by intravenous administration of l-asparaginase during the light phase, whereas its administration during the dark phase failed to show significant anti-tumor activity. Decreases in plasma asparagine levels due to the administration of l-asparaginase were closely related to the dosing time-dependency of its anti-tumor effects. These results suggest that the anti-tumor efficacy of l-asparaginase in breast tumor-bearing mice is improved by optimizing the dosing schedule. Keywords: l-asparaginase, Asparagine, Solid tumor, Chrono-pharmacotherapy

  16. Optimizing the dosing schedule of l-asparaginase improves its anti-tumor activity in breast tumor-bearing mice.

    Science.gov (United States)

    Shiromizu, Shoya; Kusunose, Naoki; Matsunaga, Naoya; Koyanagi, Satoru; Ohdo, Shigehiro

    2018-04-01

    Proliferation of acute lymphoblastic leukemic cells is nutritionally dependent on the external supply of asparagine. l-asparaginase, an enzyme hydrolyzing l-asparagine in blood, is used for treatment of acute lymphoblastic leukemic and other related blood cancers. Although previous studies demonstrated that l-asparaginase suppresses the proliferation of cultured solid tumor cells, it remains unclear whether this enzyme prevents the growth of solid tumors in vivo. In this study, we demonstrated the importance of optimizing dosing schedules for the anti-tumor activity of l-asparaginase in 4T1 breast tumor-bearing mice. Cultures of several types of murine solid tumor cells were dependent on the external supply of asparagine. Among them, we selected murine 4T1 breast cancer cells and implanted them into BALB/c female mice kept under standardized light/dark cycle conditions. The growth of 4T1 tumor cells implanted in mice was significantly suppressed by intravenous administration of l-asparaginase during the light phase, whereas its administration during the dark phase failed to show significant anti-tumor activity. Decreases in plasma asparagine levels due to the administration of l-asparaginase were closely related to the dosing time-dependency of its anti-tumor effects. These results suggest that the anti-tumor efficacy of l-asparaginase in breast tumor-bearing mice is improved by optimizing the dosing schedule. Copyright © 2018 The Authors. Production and hosting by Elsevier B.V. All rights reserved.

  17. Scheduling rules to achieve lead-time targets in outpatient appointment systems

    OpenAIRE

    Sivakumar, Appa Iyer; Nguyen, Thu Ba Thi; Graves, Stephen C

    2015-01-01

    This paper considers how to schedule appointments for outpatients, for a clinic that is subject to appointment lead-time targets for both new and returning patients. We develop heuristic rules, which are the exact and relaxed appointment scheduling rules, to schedule each new patient appointment (only) in light of uncertainty about future arrivals. The scheduling rules entail two decisions. First, the rules need to determine whether or not a patient's request can be accepted; then, if the req...

  18. Two-Agent Single-Machine Scheduling of Jobs with Time-Dependent Processing Times and Ready Times

    Directory of Open Access Journals (Sweden)

    Jan-Yee Kung

    2013-01-01

    Full Text Available Scheduling involving jobs with time-dependent processing times has recently attracted much research attention. However, multiagent scheduling with simultaneous considerations of jobs with time-dependent processing times and ready times is relatively unexplored. Inspired by this observation, we study a two-agent single-machine scheduling problem in which the jobs have both time-dependent processing times and ready times. We consider the model in which the actual processing time of a job of the first agent is a decreasing function of its scheduled position while the actual processing time of a job of the second agent is an increasing function of its scheduled position. In addition, each job has a different ready time. The objective is to minimize the total completion time of the jobs of the first agent with the restriction that no tardy job is allowed for the second agent. We propose a branch-and-bound and several genetic algorithms to obtain optimal and near-optimal solutions for the problem, respectively. We also conduct extensive computational results to test the proposed algorithms and examine the impacts of different problem parameters on their performance.

  19. Factors influencing completion of multi-dose vaccine schedules in adolescents: a systematic review

    Directory of Open Access Journals (Sweden)

    K. E. Gallagher

    2016-02-01

    Full Text Available Abstract Background Completion of multiple dose vaccine schedules is crucial to ensure a protective immune response, and maximise vaccine cost-effectiveness. While barriers and facilitators to vaccine uptake have recently been reviewed, there is no comprehensive review of factors influencing subsequent adherence or completion, which is key to achieving vaccine effectiveness. This study identifies and summarises the literature on factors affecting completion of multi-dose vaccine schedules by adolescents. Methods Ten online databases and four websites were searched (February 2014. Studies with analysis of factors predicting completion of multi-dose vaccines were included. Study participants within 9–19 years of age were included in the review. The defined outcome was completion of the vaccine series within 1 year among those who received the first dose. Results Overall, 6159 abstracts were screened, and 502 full texts were reviewed. Sixty one studies were eligible for this review. All except two were set in high-income countries. Included studies evaluated human papillomavirus vaccine, hepatitis A, hepatitis B, and varicella vaccines. Reported vaccine completion rates, among those who initiated vaccination, ranged from 27 % to over 90 %. Minority racial or ethnic groups and inadequate health insurance coverage were risk factors for low completion, irrespective of initiation rates. Parental healthcare seeking behaviour was positively associated with completion. Vaccine delivery in schools was associated with higher completion than delivery in the community or health facilities. Gender, prior healthcare use and socio-economic status rarely remained significant risks or protective factors in multivariate analysis. Conclusions Almost all studies investigating factors affecting completion have been carried out in developed countries and investigate a limited range of variables. Increased understanding of barriers to completion in adolescents will

  20. Multiresource allocation and scheduling for periodic soft real-time applications

    Science.gov (United States)

    Gopalan, Kartik; Chiueh, Tzi-cker

    2001-12-01

    Real-time applications that utilize multiple system resources, such as CPU, disks, and network links, require coordinated scheduling of these resources in order to meet their end-to-end performance requirements. Most state-of-the-art operating systems support independent resource allocation and deadline-driven scheduling but lack coordination among multiple heterogeneous resources. This paper describes the design and implementation of an Integrated Real-time Resource Scheduler (IRS) that performs coordinated allocation and scheduling of multiple heterogeneous resources on the same machine for periodic soft real-time application. The principal feature of IRS is a heuristic multi-resource allocation algorithm that reserves multiple resources for real-time applications in a manner that can maximize the number of applications admitted into the system in the long run. At run-time, a global scheduler dispatches the tasks of the soft real-time application to individual resource schedulers according to the precedence constraints between tasks. The individual resource schedulers, which could be any deadline based schedulers, can make scheduling decisions locally and yet collectively satisfy a real-time application's performance requirements. The tightness of overall timing guarantees is ultimately determined by the properties of individual resource schedulers. However, IRS maximizes overall system resource utilization efficiency by coordinating deadline assignment across multiple tasks in a soft real-time application.

  1. Some aspects of time-dose relationships

    International Nuclear Information System (INIS)

    Sugawara, Tadashi; Koito, Kazumitsu; Aihara, Toshinori

    1985-01-01

    One hundred thirty-seven patients with non-small cell lung cancers, 57 with oral cavity cancers and 98 with postoperative breast cancers treated with external radiotherapy from 1974 to 1980 were analyzed to determine optimal trends of time-dose relationships. Superiorities of fractionation factors were examined by comparing the relative local recurrence or expire rates among the subgroups prognostically homogenized in each entities of the diseases. Faborable fractionation factors for the former two diseases were those in which treatment was given in shortened over-all times, and frequently with low fraction dose to the considerably high daily dose. These results indicate the superiority of accelerated fractionation regime to conventional one in the treatment of those diseases. In contrast, any optimal trend was not found with postoperative breast cancers but total dose administered more than 43 Gy. (author)

  2. The R-Shell approach - Using scheduling agents in complex distributed real-time systems

    Science.gov (United States)

    Natarajan, Swaminathan; Zhao, Wei; Goforth, Andre

    1993-01-01

    Large, complex real-time systems such as space and avionics systems are extremely demanding in their scheduling requirements. The current OS design approaches are quite limited in the capabilities they provide for task scheduling. Typically, they simply implement a particular uniprocessor scheduling strategy and do not provide any special support for network scheduling, overload handling, fault tolerance, distributed processing, etc. Our design of the R-Shell real-time environment fcilitates the implementation of a variety of sophisticated but efficient scheduling strategies, including incorporation of all these capabilities. This is accomplished by the use of scheduling agents which reside in the application run-time environment and are responsible for coordinating the scheduling of the application.

  3. Low-Energy Real-Time OS Using Voltage Scheduling Algorithm for Variable Voltage Processors

    OpenAIRE

    Okuma, Takanori; Yasuura, Hiroto

    2001-01-01

    This paper presents a real-time OS based on $ mu $ITRON using proposed voltage scheduling algorithm for variable voltage processors which can vary supply voltage dynamically. The proposed voltage scheduling algorithms assign voltage level for each task dynamically in order to minimize energy consumption under timing constraints. Using the presented real-time OS, running tasks with low supply voltage leads to drastic energy reduction. In addition, the presented voltage scheduling algorithm is ...

  4. Analyzing the effect of gain time on soft task scheduling policies in real-time systems

    OpenAIRE

    Búrdalo Rapa, Luis Antonio; Terrasa Barrena, Andrés Martín; Espinosa Minguet, Agustín Rafael; García Fornes, Ana María

    2012-01-01

    In hard real-time systems, gain time is defined as the difference between the Worst Case Execution Time (WCET) of a hard task and its actual processor consumption at runtime. This paper presents the results of an empirical study about how the presence of a significant amount of gain time in a hard real-time system questions the advantages of using the most representative scheduling algorithms or policies for aperiodic or soft tasks in fixed-priority preemptive systems. The work presented here...

  5. FLOW-SHOP SCHEDULING WITH MULTIPLE OPERATIONS AND TIME LAGS

    NARCIS (Netherlands)

    RIEZEBOS, J; GAALMAN, GJC; GUPTA, JND

    A scheduling system is proposed and developed for a special type of flow shop. Ln this flow shop there is one machine at each stage. A job may require multiple operations at each stage. The first operation of a job on stage j cannot start until the last operation of the job on stage j - 1 has

  6. JIST: Just-In-Time Scheduling Translation for Parallel Processors

    Directory of Open Access Journals (Sweden)

    Giovanni Agosta

    2005-01-01

    Full Text Available The application fields of bytecode virtual machines and VLIW processors overlap in the area of embedded and mobile systems, where the two technologies offer different benefits, namely high code portability, low power consumption and reduced hardware cost. Dynamic compilation makes it possible to bridge the gap between the two technologies, but special attention must be paid to software instruction scheduling, a must for the VLIW architectures. We have implemented JIST, a Virtual Machine and JIT compiler for Java Bytecode targeted to a VLIW processor. We show the impact of various optimizations on the performance of code compiled with JIST through the experimental study on a set of benchmark programs. We report significant speedups, and increments in the number of instructions issued per cycle up to 50% with respect to the non-scheduling version of the JITcompiler. Further optimizations are discussed.

  7. A software-based technique enabling composable hierarchical preemptive scheduling for time-triggered applications

    NARCIS (Netherlands)

    Nejad, A.B.; Molnos, A.; Goossens, K.G.W.

    2013-01-01

    Many embedded real-time applications are typically time-triggered and preemptive schedulers are used to execute tasks of such applications. Orthogonally, composable partitioned embedded platforms use preemptive time-division multiplexing mechanism to isolate applications. Existing composable systems

  8. Real time source term and dose assessment

    International Nuclear Information System (INIS)

    Breznik, B.; Kovac, A.; Mlakar, P.

    2001-01-01

    The Dose Projection Programme is a tool for decision making in case of nuclear emergency. The essential input data for quick emergency evaluation in the case of hypothetical pressurised water reactor accident are following: source term, core damage assessment, fission product radioactivity, release source term and critical exposure pathways for an early phase of the release. A reduced number of radio-nuclides and simplified calculations can be used in dose calculation algorithm. Simple expert system personal computer programme has been developed for the Krsko Nuclear Power Plant for dose projection within the radius of few kilometers from the pressurised water reactor in early phase of an accident. The input data are instantaneous data of core activity, core damage indicators, release fractions, reduction factor of the release pathways, spray operation, release timing, and dispersion coefficient. Main dose projection steps are: accurate in-core radioactivity determination using reactor power input; core damage and in-containment source term assessment based on quick indications of instrumentation or on activity analysis data; user defines release pathway for typical PWR accident scenarius; dose calculation is performed only for exposure pathway critical for decision about evacuation or sheltering in early phase of an accident.(author)

  9. Quality Improvement, Inventory Management, Lead Time Reduction and Production Scheduling in High-Mix Manufacturing Environments

    Science.gov (United States)

    2017-01-13

    Quality Improvement , Inventory Management, Lead Time Reduction and Production Scheduling in High-mix Manufacturing Environments by Sean Daigle B.S...Mechanical Engineering Chairman, Department Committee on Graduate Theses 2 Quality Improvement , Inventory Management, Lead Time Reduction and... Production Scheduling in High-mix Manufacturing Environments by Sean Daigle Submitted to the Department of Mechanical Engineering on January 13, 2017, in

  10. Real-Time Scheduling for Preventing Information Leakage with Preemption Overheads

    Directory of Open Access Journals (Sweden)

    BAEK, H.

    2017-05-01

    Full Text Available Real-time systems (RTS are characterized by tasks executing in a timely manner to meet its deadlines as a real-time constraint. Most studies of RTS have focused on these criteria as primary design points. However, recent increases in security threats to various real-time systems have shown that enhanced security support must be included as an important design point, retro-fitting such support to existing systems as necessary. In this paper, we propose a new pre-flush technique referred to as flush task reservation for FP scheduling (FTR-FP to conditionally sanitize the state of resources shared by real-time tasks by invoking a flush task (FT in order to mitigate information leakage/corruption of real-time systems. FTR-FP extends existing works exploiting FTs to be applicable more general scheduling algorithms and security model. We also propose modifications to existing real-time scheduling algorithms to implement a pre-flush technique as a security constraint, and analysis technique to verify schedulability of the real-time scheduling. For better analytic capability, our analysis technique provides a count of the precise number of preemptions that a task experiences offline. Our evaluation results demonstrate that our proposed schedulability analysis improves the performance of existing scheduling algorithms in terms of schedulability and preemption cost.

  11. A Conceptual Level Design for a Static Scheduler for Hard Real-Time Systems

    Science.gov (United States)

    1988-03-01

    The design of hard real - time systems is gaining a great deal of attention in the software engineering field as more and more real-world processes are...for these hard real - time systems . PSDL, as an executable design language, is supported by an execution support system consisting of a static scheduler, dynamic scheduler, and translator.

  12. A Scheduling Algorithm for Time Bounded Delivery of Packets on the Internet

    NARCIS (Netherlands)

    I. Vaishnavi (Ishan)

    2008-01-01

    htmlabstractThis thesis aims to provide a better scheduling algorithm for Real-Time delivery of packets. A number of emerging applications such as VoIP, Tele-immersive environments, distributed media viewing and distributed gaming require real-time delivery of packets. Currently the scheduling

  13. Scheduling for energy and reliability management on multiprocessor real-time systems

    Science.gov (United States)

    Qi, Xuan

    Scheduling algorithms for multiprocessor real-time systems have been studied for years with many well-recognized algorithms proposed. However, it is still an evolving research area and many problems remain open due to their intrinsic complexities. With the emergence of multicore processors, it is necessary to re-investigate the scheduling problems and design/develop efficient algorithms for better system utilization, low scheduling overhead, high energy efficiency, and better system reliability. Focusing cluster schedulings with optimal global schedulers, we study the utilization bound and scheduling overhead for a class of cluster-optimal schedulers. Then, taking energy/power consumption into consideration, we developed energy-efficient scheduling algorithms for real-time systems, especially for the proliferating embedded systems with limited energy budget. As the commonly deployed energy-saving technique (e.g. dynamic voltage frequency scaling (DVFS)) will significantly affect system reliability, we study schedulers that have intelligent mechanisms to recuperate system reliability to satisfy the quality assurance requirements. Extensive simulation is conducted to evaluate the performance of the proposed algorithms on reduction of scheduling overhead, energy saving, and reliability improvement. The simulation results show that the proposed reliability-aware power management schemes could preserve the system reliability while still achieving substantial energy saving.

  14. Delay differential equations and the dose-time dependence of early radiotherapy reactions

    International Nuclear Information System (INIS)

    Fenwick, John D.

    2006-01-01

    The dose-time dependence of early radiotherapy reactions impacts on the design of accelerated fractionation schedules--oral mucositis, for example, can be dose limiting for short treatments designed to avoid tumor repopulation. In this paper a framework for modeling early reaction dose-time dependence is developed. Variation of stem cell number with time after the start of a radiation schedule is modeled using a first-order delay differential equation (DDE), motivated by experimental observations linking the speed of compensatory proliferation in early reacting tissues to the degree of tissue damage. The modeling suggests that two types of early reaction radiation response are possible, stem cell numbers either monotonically approaching equilibrium plateau levels or overshooting before returning to equilibrium. Several formulas have been derived from the delay differential equation, predicting changes in isoeffective total radiation dose with schedule duration for different types of fractionation scheme. The formulas have been fitted to a wide range of published animal early reaction data, the fits all implying a degree of overshoot. Results are presented illustrating the scope of the delay differential model: most of the data are fitted well, although the model struggles with a few datasets measured for schedules with distinctive dose-time patterns. Ways of extending the current model to cope with these particular dose-time patterns are briefly discussed. The DDE approach is conceptually more complex than earlier descriptive dose-time models but potentially more powerful. It can be used to study issues not addressed by simpler models, such as the likely effects of increasing or decreasing the dose-per-day over time, or of splitting radiation courses into intense segments separated by gaps. It may also prove useful for modeling the effects of chemoirradiation

  15. Delay differential equations and the dose-time dependence of early radiotherapy reactions.

    Science.gov (United States)

    Fenwick, John D

    2006-09-01

    The dose-time dependence of early radiotherapy reactions impacts on the design of accelerated fractionation schedules--oral mucositis, for example, can be dose limiting for short treatments designed to avoid tumor repopulation. In this paper a framework for modeling early reaction dose-time dependence is developed. Variation of stem cell number with time after the start of a radiation schedule is modeled using a first-order delay differential equation (DDE), motivated by experimental observations linking the speed of compensatory proliferation in early reacting tissues to the degree of tissue damage. The modeling suggests that two types of early reaction radiation response are possible, stem cell numbers either monotonically approaching equilibrium plateau levels or overshooting before returning to equilibrium. Several formulas have been derived from the delay differential equation, predicting changes in isoeffective total radiation dose with schedule duration for different types of fractionation scheme. The formulas have been fitted to a wide range of published animal early reaction data, the fits all implying a degree of overshoot. Results are presented illustrating the scope of the delay differential model: most of the data are fitted well, although the model struggles with a few datasets measured for schedules with distinctive dose-time patterns. Ways of extending the current model to cope with these particular dose-time patterns are briefly discussed. The DDE approach is conceptually more complex than earlier descriptive dose-time models but potentially more powerful. It can be used to study issues not addressed by simpler models, such as the likely effects of increasing or decreasing the dose-per-day over time, or of splitting radiation courses into intense segments separated by gaps. It may also prove useful for modeling the effects of chemoirradiation.

  16. Joint time-frequency domain proportional fair scheduler with HARQ for 3GPP LTE systems

    OpenAIRE

    Beh, KC; Doufexi, A; Armour, SMD

    2008-01-01

    This paper explores the potential gain of joint diversity in both frequency domain and time domain which can be exploited to achieve spectral efficiency gains whilst simultaneously facilitating QoS/ fairness in an OFDMA system particularly in 3GPP Long Term Evolution (LTE)). The performance of several joint time-frequency schedulers is investigated. Simulation results show that joint time frequency schedulers achieve significantly superior performance compared to a more conventional time doma...

  17. Multi-objective Mobile Robot Scheduling Problem with Dynamic Time Windows

    DEFF Research Database (Denmark)

    Dang, Vinh Quang; Nielsen, Izabela Ewa; Steger-Jensen, Kenn

    2012-01-01

    This paper deals with the problem of scheduling feeding tasks of a single mobile robot which has capability of supplying parts to feeders on pro-duction lines. The performance criterion is to minimize the total traveling time of the robot and the total tardiness of the feeding tasks being scheduled...

  18. A new approach for global synchronization in hierarchical scheduled real-time systems

    NARCIS (Netherlands)

    Behnam, M.; Nolte, T.; Bril, R.J.

    2009-01-01

    We present our ongoing work to improve an existing synchronization protocol SIRAP for hierarchically scheduled real-time systems. A less pessimistic schedulability analysis is presented which can make the SIRAP protocol more efficient in terms of calculated CPU resource needs. In addition and for

  19. Dose-time relationships for post-irradiation cutaneous telangiectasia

    International Nuclear Information System (INIS)

    Cohen, L.; Ubaldi, S.E.

    1977-01-01

    Seventy-five patients who had received electron beam radiation a year or more previously were studied. The irradiated skin portals were photographed and late reactions graded in terms of the number and severity of telangiectatic lesions observed. The skin dose, number of fractions, overall treatment time and irradiated volume were recorded in each case. A Strandqvist-type iso-effect line was derived for this response. A multi-probit search program also was used to derive best-fitting cell population kinetic parameters for the same data. From these parameters a comprehensive iso-effect table could be computed for a wide range of treatment schedules including daily treatment as well as fractionation at shorter and longer intervals; this provided a useful set of normal tissue tolerance limits for late effects

  20. Timing analysis for embedded systems using non-preemptive EDF scheduling under bounded error arrivals

    Directory of Open Access Journals (Sweden)

    Michael Short

    2017-07-01

    Full Text Available Embedded systems consist of one or more processing units which are completely encapsulated by the devices under their control, and they often have stringent timing constraints associated with their functional specification. Previous research has considered the performance of different types of task scheduling algorithm and developed associated timing analysis techniques for such systems. Although preemptive scheduling techniques have traditionally been favored, rapid increases in processor speeds combined with improved insights into the behavior of non-preemptive scheduling techniques have seen an increased interest in their use for real-time applications such as multimedia, automation and control. However when non-preemptive scheduling techniques are employed there is a potential lack of error confinement should any timing errors occur in individual software tasks. In this paper, the focus is upon adding fault tolerance in systems using non-preemptive deadline-driven scheduling. Schedulability conditions are derived for fault-tolerant periodic and sporadic task sets experiencing bounded error arrivals under non-preemptive deadline scheduling. A timing analysis algorithm is presented based upon these conditions and its run-time properties are studied. Computational experiments show it to be highly efficient in terms of run-time complexity and competitive ratio when compared to previous approaches.

  1. Scheduling of Fault-Tolerant Embedded Systems with Soft and Hard Timing Constraints

    DEFF Research Database (Denmark)

    Izosimov, Viacheslav; Pop, Paul; Eles, Petru

    2008-01-01

    In this paper we present an approach to the synthesis of fault-tolerant schedules for embedded applications with soft and hard real-time constraints. We are interested to guarantee the deadlines for the hard processes even in the case of faults, while maximizing the overall utility. We use time....../utility functions to capture the utility of soft processes. Process re-execution is employed to recover from multiple faults. A single static schedule computed off-line is not fault tolerant and is pessimistic in terms of utility, while a purely online approach, which computes a new schedule every time a process...

  2. Ultra-rapid high dose irradiation schedules for the palliation of brain metastases: final results of the first two studies by the radiation therapy oncology group

    International Nuclear Information System (INIS)

    Borgelt, B.; Gelber, R.; Larson, M.; Hendrickson, F.; Griffin, T.; Rother, R.

    1981-01-01

    Between January, 1971, and February, 1976, the Radiation Therapy Oncology Group entered 1902 evaluable patients into two sequential Phase III national cooperative trials to study the effectiveness of different time dose radiotherapy schemes on the palliation of patients with brain metastases. Each trial included an optional arm into which patients were randomized to receive 1000 rad/1 fraction (26 patients, First study) or 1200 rad/2 fractions (33 patients, Second study). Comparisons were made with 143 control patients randomized by the same participating institutions to receive a more protracted course of irradiation (2000, 3000 or 4000 rad/1-4wks). Response of patients receiving ultra-rapid treatment, as assessed by the percent who had improvement in neurologic function, was comparable to that of patients receiving the more protracted schedules. Promptness of neurologic function improvement, treatment morbidity and median survival were also comparable to those of patients receiving 2000 to 4000 rad. However, the duration of improvement, time to progression of neurologic status and rate of complete disappearance of neurologic symptoms were generally less for those patients who received 1000 or 1200 rad. These results suggest that ultra-rapid, high dose irradiation schedules may not be so effective as higher dose schedules in the palliation of patients with brain metastases

  3. Effects of travel time delay on multi-faceted activity scheduling under space-time constraints : a simulation study

    NARCIS (Netherlands)

    Rasouli, S.; Timmermans, H.J.P.

    2014-01-01

    This paper presents the results of a study, which simulates the effects of travel time delay on adaptations of planned activity-travel schedules. The activity generation and scheduling engine of the Albatross model system is applied to a fraction of the synthetic population of the Rotterdam region,

  4. The liner shipping berth scheduling problem with transit times

    DEFF Research Database (Denmark)

    Reinhardt, Line Blander; Plum, Christian E.M.; Pisinger, David

    2016-01-01

    In this paper speed optimization of an existing liner shipping network is solved by adjusting the port berth times. The objective is to minimize fuel consumption while retaining the customer transit times including the transhipment times. To avoid too many changes to the time table, changes of port...

  5. Stage, tumor growth rate and optimal dose fractionation schedules in the treatment of squamous cell carcinoma of the head and neck

    International Nuclear Information System (INIS)

    Sugawara, Tadashi; Morita, Mamoru; Aihara, Toshinori; Tanaka, Osamu

    1983-01-01

    In 77 patients with cancer of the head and neck, 45 patients received radiotherapy alone, while 32 patients with T 1 or T 2 glottic cancer received combined therapy with laryngomicrosurgery performed prior to or during the course of irradiation. These T 1 and T 2 groups were separately analyzed from other T 1 and T 2 groups as T sub(LMS). Local recurrence rates were compared concerning overall time and fraction size in following three subgroups, i.e., T sub(LMS), Tsub(1+2), and Tsub(3+4). No significant correlation was detected between total dose converted to partial tolerance (PT) and local control in all subgroups except for Tsub(3+4), in which local recurrence rate was rather higher in high PT range. Local control was significantly dependent on overall treatment time and fraction size, differently by tumor stage. Favorable fractionation schedules considered as optimal for T sub(LMS) were those in which treatment was given 5 times weekly with a daily dose rate more than 196 rad in a shorter overall time of less than 42 days. In contrast to T sub(LMS), effective schedules for Tsub(3+4) consisted of longer overall time of more than 60 days and a lower daily dose rate of less than 153 rad. In Tsub(1+2), the optimal schedule was needed to be altered according to rapidness of progression of disease characterised by duration of the complaints, which was statistically proved to be significantly shorter in Tsub(1+2) than Tsub(3+4). Rapidity-adjusted schedule consisted of a shorter over-all time of less than 49 days with a daily dose rate of more than 175 rad 5 fractions a week for a case having a duration of complaints of less than 2.9 months, and a longer overall time of more than 50 days with a daily dose rate of less than 174 rad for a case having a duration of more than 3 months. (J.P.N.)

  6. Dosage and dose schedule screening of drug combinations in agent-based models reveals hidden synergies

    Directory of Open Access Journals (Sweden)

    Lisa Corina Barros de Andrade e Sousa1

    2016-01-01

    Full Text Available The fungus Candida albicans is the most common causative agent of human fungal infections and better drugs or drug combination strategies are urgently needed. Here, we present an agent-based model of the interplay of C. albicans with the host immune system and with the microflora of the host. We took into account the morphological change of C. albicans from the yeast to hyphae form and its dynamics during infection. The model allowed us to follow the dynamics of fungal growth and morphology, of the immune cells and of microflora in different perturbing situations. We specifically focused on the consequences of microflora reduction following antibiotic treatment. Using the agent-based model, different drug types have been tested for their effectiveness, namely drugs that inhibit cell division and drugs that constrain the yeast-to-hyphae transition. Applied individually, the division drug turned out to successfully decrease hyphae while the transition drug leads to a burst in hyphae after the end of the treatment. To evaluate the effect of different drug combinations, doses, and schedules, we introduced a measure for the return to a healthy state, the infection score. Using this measure, we found that the addition of a transition drug to a division drug treatment can improve the treatment reliability while minimizing treatment duration and drug dosage. In this work we present a theoretical study. Although our model has not been calibrated to quantitative experimental data, the technique of computationally identifying synergistic treatment combinations in an agent based model exemplifies the importance of computational techniques in translational research.

  7. Selection and scheduling of jobs with time-dependent duration

    African Journals Online (AJOL)

    †Department of Logistics, University of Stellenbosch, Private Bag X1, ... station must apply to occupy the test station and sometimes may even choose ... are considered where the job duration and cost are dependent on the time and sequence.

  8. Exact methods for time constrained routing and related scheduling problems

    DEFF Research Database (Denmark)

    Kohl, Niklas

    1995-01-01

    of customers. In the VRPTW customers must be serviced within a given time period - a so called time window. The objective can be to minimize operating costs (e.g. distance travelled), fixed costs (e.g. the number of vehicles needed) or a combination of these component costs. During the last decade optimization......This dissertation presents a number of optimization methods for the Vehicle Routing Problem with Time Windows (VRPTW). The VRPTW is a generalization of the well known capacity constrained Vehicle Routing Problem (VRP), where a fleet of vehicles based at a central depot must service a set...... of J?rnsten, Madsen and S?rensen (1986), which has been tested computationally by Halse (1992). Both methods decompose the problem into a series of time and capacity constrained shotest path problems. This yields a tight lower bound on the optimal objective, and the dual gap can often be closed...

  9. Distributed energy resources scheduling considering real-time resources forecast

    DEFF Research Database (Denmark)

    Silva, M.; Sousa, T.; Ramos, S.

    2014-01-01

    grids and considering day-ahead, hour-ahead and realtime time horizons. This method considers that energy resources are managed by a VPP which establishes contracts with their owners. The full AC power flow calculation included in the model takes into account network constraints. In this paper......, distribution function errors are used to simulate variations between time horizons, and to measure the performance of the proposed methodology. A 33-bus distribution network with large number of distributed resources is used....

  10. A Flattened Hierarchical Scheduler for Real-Time Virtual Machines

    OpenAIRE

    Drescher, Michael Stuart

    2015-01-01

    The recent trend of migrating legacy computer systems to a virtualized, cloud-based environment has expanded to real-time systems. Unfortunately, modern hypervisors have no mechanism in place to guarantee the real-time performance of applications running on virtual machines. Past solutions to this problem rely on either spatial or temporal resource partitioning, both of which under-utilize the processing capacity of the host system. Paravirtualized solutions in which the guest communicates it...

  11. Time Impact of Scheduling Simulation for High Rise Building

    OpenAIRE

    Asmadi Ismail; Mohamad Ibrahim Mohamad; Muhamad Azani Yahya

    2011-01-01

    Although the long-introduced Industrialised Building System (IBS) has promised to solve and improve the current construction method and scenario in our country, but the IBS method has not gained enough popularity. One of the reasons is due to lack of research works done to quantifying the benefit of IBS especially in construction time saving. In lieu with such scenario, this study conducted to quantify evidence of time saving in IBS application. The methodology adopted for this study is by mo...

  12. 5 CFR 610.405 - Holiday for part-time employees on flexible work schedules.

    Science.gov (United States)

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Holiday for part-time employees on... part-time employees on flexible work schedules. If a part-time employee is relieved or prevented from... falls on a nonworkday of a part-time employee, he or she is not entitled to an in-lieu-of day for that...

  13. Susceptibility of optimal train schedules to stochastic disturbances of process times

    DEFF Research Database (Denmark)

    Larsen, Rune; Pranzo, Marco; D’Ariano, Andrea

    2013-01-01

    study, an advanced branch and bound algorithm, on average, outperforms a First In First Out scheduling rule both in deterministic and stochastic traffic scenarios. However, the characteristic of the stochastic processes and the way a stochastic instance is handled turn out to have a serious impact...... and dwell times). In fact, the objective of railway traffic management is to reduce delay propagation and to increase disturbance robustness of train schedules at a network scale. We present a quantitative study of traffic disturbances and their effects on the schedules computed by simple and advanced...

  14. Real-time Energy Resource Scheduling considering a Real Portuguese Scenario

    DEFF Research Database (Denmark)

    Silva, Marco; Sousa, Tiago; Morais, Hugo

    2014-01-01

    The development in power systems and the introduction of decentralized gen eration and Electric Vehicles (EVs), both connected to distribution networks, represents a major challenge in the planning and operation issues. This new paradigm requires a new energy resources management approach which...... scheduling in smart grids, considering day - ahead, hour - ahead and real - time scheduling. The case study considers a 33 - bus distribution network with high penetration of distributed energy resources . The wind generation profile is base d o n a rea l Portuguese wind farm . Four scenarios are presented...... taking into account 0, 1, 2 and 5 periods (hours or minutes) ahead of the scheduling period in the hour - ahead and real - time scheduling...

  15. Non preemptive soft real time scheduler: High deadline meeting rate on overload

    Science.gov (United States)

    Khalib, Zahereel Ishwar Abdul; Ahmad, R. Badlishah; El-Shaikh, Mohamed

    2015-05-01

    While preemptive scheduling has gain more attention among researchers, current work in non preemptive scheduling had shown promising result in soft real time jobs scheduling. In this paper we present a non preemptive scheduling algorithm meant for soft real time applications, which is capable of producing better performance during overload while maintaining excellent performance during normal load. The approach taken by this algorithm has shown more promising results compared to other algorithms including its immediate predecessor. We will present the analysis made prior to inception of the algorithm as well as simulation results comparing our algorithm named gutEDF with EDF and gEDF. We are convinced that grouping jobs utilizing pure dynamic parameters would produce better performance.

  16. Strategies for Teaching in a Block-of-Time Schedule.

    Science.gov (United States)

    Hackmann, Donald G.; Schmitt, Donna M.

    1997-01-01

    Offers suggestions for developing creative instructional approaches in time-blocked classes. Teachers should continuously engage students in active learning, include group activities to encourage student participation, incorporate activities addressing multiple intelligences, use creative thinking activities, move outside the classroom, employ…

  17. Real-Time Integrated Re-scheduling for Tramway Operations

    NARCIS (Netherlands)

    Cheung, Kam-Fung; Kuo, Yong-Hong; Lai, S.W.; Leung, Janny M.Y.

    2018-01-01

    Our work aims to develop practical solution approaches for real-time dispatch of crews and vehicles for disruption management. The practical motivation for our research arose from the operations of a public tramway system in Hong Kong. The tram system shares the road with other vehicular traffic in

  18. Time and multiple objectives in scheduling and routing problems

    NARCIS (Netherlands)

    Dabia, S.

    2012-01-01

    Many optimization problems encountered in practice are multi-objective by nature, i.e., different objectives are conflicting and equally important. Many times, it is not desirable to drop some of them or to optimize them in a composite single objective or hierarchical manner. Furthermore, cost

  19. A new variable interval schedule with constant hazard rate and finite time range.

    Science.gov (United States)

    Bugallo, Mehdi; Machado, Armando; Vasconcelos, Marco

    2018-05-27

    We propose a new variable interval (VI) schedule that achieves constant probability of reinforcement in time while using a bounded range of intervals. By sampling each trial duration from a uniform distribution ranging from 0 to 2 T seconds, and then applying a reinforcement rule that depends linearly on trial duration, the schedule alternates reinforced and unreinforced trials, each less than 2 T seconds, while preserving a constant hazard function. © 2018 Society for the Experimental Analysis of Behavior.

  20. Single machine scheduling with time-dependent linear deterioration and rate-modifying maintenance

    OpenAIRE

    Rustogi, Kabir; Strusevich, Vitaly A.

    2015-01-01

    We study single machine scheduling problems with linear time-dependent deterioration effects and maintenance activities. Maintenance periods (MPs) are included into the schedule, so that the machine, that gets worse during the processing, can be restored to a better state. We deal with a job-independent version of the deterioration effects, that is, all jobs share a common deterioration rate. However, we introduce a novel extension to such models and allow the deterioration rates to change af...

  1. Supporting Real-Time Operations and Execution through Timeline and Scheduling Aids

    Science.gov (United States)

    Marquez, Jessica J.; Pyrzak, Guy; Hashemi, Sam; Ahmed, Samia; McMillin, Kevin Edward; Medwid, Joseph Daniel; Chen, Diana; Hurtle, Esten

    2013-01-01

    Since 2003, the NASA Ames Research Center has been actively involved in researching and advancing the state-of-the-art of planning and scheduling tools for NASA mission operations. Our planning toolkit SPIFe (Scheduling and Planning Interface for Exploration) has supported a variety of missions and field tests, scheduling activities for Mars rovers as well as crew on-board International Space Station and NASA earth analogs. The scheduled plan is the integration of all the activities for the day/s. In turn, the agents (rovers, landers, spaceships, crew) execute from this schedule while the mission support team members (e.g., flight controllers) follow the schedule during execution. Over the last couple of years, our team has begun to research and validate methods that will better support users during realtime operations and execution of scheduled activities. Our team utilizes human-computer interaction principles to research user needs, identify workflow processes, prototype software aids, and user test these. This paper discusses three specific prototypes developed and user tested to support real-time operations: Score Mobile, Playbook, and Mobile Assistant for Task Execution (MATE).

  2. SU-F-19A-08: Optimal Time Release Schedule of In-Situ Drug Release During Permanent Prostate Brachytherapy

    International Nuclear Information System (INIS)

    Cormack, R; Ngwa, W; Makrigiorgos, G; Tangutoori, S; Rajiv, K; Sridhar, S

    2014-01-01

    Purpose: Permanent prostate brachytherapy spacers can be used to deliver sustained doses of radiosentitizing drug directly to the target, in order to enhance the radiation effect. Implantable nanoplatforms for chemo-radiation therapy (INCeRTs) have a maximum drug capacity and can be engineered to control the drug release schedule. The optimal schedule for sensitization during continuous low dose rate irradiation is unknown. This work studies the optimal release schedule of drug for both traditional sensitizers, and those that work by suppressing DNA repair processes. Methods: Six brachytherapy treatment plans were used to model the anatomy, implant geometry and calculate the spatial distribution of radiation dose and drug concentrations for a range of drug diffusion parameters. Three state partial differential equations (cells healthy, damaged or dead) modeled the effect of continuous radiation (radiosensitivities α,β) and cellular repair (time tr) on a cell population. Radiosensitization was modeled as concentration dependent change in α,β or tr which with variable duration under the constraint of fixed total drug release. Average cell kill was used to measure effectiveness. Sensitization by means of both enhanced damage and reduced repair were studied. Results: Optimal release duration is dependent on the concentration of radiosensitizer compared to the saturation concentration (csat) above which additional sensitization does not occur. Long duration drug release when enhancing α or β maximizes cell death when drug concentrations are generally over csat. Short term release is optimal for concentrations below saturation. Sensitization by suppressing repair has a similar though less distinct trend that is more affected by the radiation dose distribution. Conclusion: Models of sustained local radiosensitization show potential to increase the effectiveness of radiation in permanent prostate brachytherapy. INCeRTs with high drug capacity produce the greatest

  3. A Heuristic Scheduling Algorithm for Minimizing Makespan and Idle Time in a Nagare Cell

    Directory of Open Access Journals (Sweden)

    M. Muthukumaran

    2012-01-01

    Full Text Available Adopting a focused factory is a powerful approach for today manufacturing enterprise. This paper introduces the basic manufacturing concept for a struggling manufacturer with limited conventional resources, providing an alternative solution to cell scheduling by implementing the technique of Nagare cell. Nagare cell is a Japanese concept with more objectives than cellular manufacturing system. It is a combination of manual and semiautomatic machine layout as cells, which gives maximum output flexibility for all kind of low-to-medium- and medium-to-high- volume productions. The solution adopted is to create a dedicated group of conventional machines, all but one of which are already available on the shop floor. This paper focuses on the development of heuristic scheduling algorithm in step-by-step method. The algorithm states that the summation of processing time of all products on each machine is calculated first and then the sum of processing time is sorted by the shortest processing time rule to get the assignment schedule. Based on the assignment schedule Nagare cell layout is arranged for processing the product. In addition, this algorithm provides steps to determine the product ready time, machine idle time, and product idle time. And also the Gantt chart, the experimental analysis, and the comparative results are illustrated with five (1×8 to 5×8 scheduling problems. Finally, the objective of minimizing makespan and idle time with greater customer satisfaction is studied through.

  4. Single machine total completion time minimization scheduling with a time-dependent learning effect and deteriorating jobs

    Science.gov (United States)

    Wang, Ji-Bo; Wang, Ming-Zheng; Ji, Ping

    2012-05-01

    In this article, we consider a single machine scheduling problem with a time-dependent learning effect and deteriorating jobs. By the effects of time-dependent learning and deterioration, we mean that the job processing time is defined by a function of its starting time and total normal processing time of jobs in front of it in the sequence. The objective is to determine an optimal schedule so as to minimize the total completion time. This problem remains open for the case of -1 < a < 0, where a denotes the learning index; we show that an optimal schedule of the problem is V-shaped with respect to job normal processing times. Three heuristic algorithms utilising the V-shaped property are proposed, and computational experiments show that the last heuristic algorithm performs effectively and efficiently in obtaining near-optimal solutions.

  5. Parallel-Machine Scheduling with Time-Dependent and Machine Availability Constraints

    Directory of Open Access Journals (Sweden)

    Cuixia Miao

    2015-01-01

    Full Text Available We consider the parallel-machine scheduling problem in which the machines have availability constraints and the processing time of each job is simple linear increasing function of its starting times. For the makespan minimization problem, which is NP-hard in the strong sense, we discuss the Longest Deteriorating Rate algorithm and List Scheduling algorithm; we also provide a lower bound of any optimal schedule. For the total completion time minimization problem, we analyze the strong NP-hardness, and we present a dynamic programming algorithm and a fully polynomial time approximation scheme for the two-machine problem. Furthermore, we extended the dynamic programming algorithm to the total weighted completion time minimization problem.

  6. Importance of dose-schedule of 5-aza-2'-deoxycytidine for epigenetic therapy of cancer

    International Nuclear Information System (INIS)

    Lemaire, Maryse; Chabot, Guy G; Raynal, Noël JM; Momparler, Louise F; Hurtubise, Annie; Bernstein, Mark L; Momparler, Richard L

    2008-01-01

    The inactivation of tumor suppressor genes (TSGs) by aberrant DNA methylation plays an important role in the development of malignancy. Since this epigenetic change is reversible, it is a potential target for chemotherapeutic intervention using an inhibitor of DNA methylation, such as 5-aza-2'-deoxycytidine (DAC). Although clinical studies show that DAC has activity against hematological malignancies, the optimal dose-schedule of this epigenetic agent still needs to be established. Clonogenic assays were performed on leukemic and tumor cell lines to evaluate the in vitro antineoplastic activity of DAC. The reactivation of TSGs and inhibition of DNA methylation by DAC were investigated by reverse transcriptase-PCR and Line-1 assays. The in vivo antineoplastic activity of DAC administered as an i.v. infusion was evaluated in mice with murine L1210 leukemia by measurement of survival time, and in mice bearing murine EMT6 mammary tumor by excision of tumor after chemotherapy for an in vitro clonogenic assay. Increasing the DAC concentration and duration of exposure produced a greater loss of clonogenicity for both human leukemic and tumor cell lines. The reactivation of the TSGs (p57KIP2 in HL-60 leukemic cells and p16CDKN2A in Calu-6 lung carcinoma cells) and the inhibition of global DNA methylation in HL-60 leukemic cells increased with DAC concentration. In mice with L1210 leukemia and in mice bearing EMT6 tumors, the antineoplastic action of DAC also increased with the dose. The plasma level of DAC that produced a very potent antineoplastic effect in mice with leukemia or solid tumors was > 200 ng/ml (> 1 μM). We have shown that intensification of the DAC dose markedly increased its antineoplastic activity in mouse models of cancer. Our data also show that there is a good correlation between the concentrations of DAC that reduce in vitro clonogenicity, reactivate TSGs and inhibit DNA methylation. These results suggest that the antineoplastic action of DAC is

  7. Optimum radiotherapy schedule for uterine cervical cancer based-on the detailed information of dose fractionation and radiotherapy technique

    International Nuclear Information System (INIS)

    Cho, Jae Ho; Kim, Hyun Chang; Suh, Chang Ok

    2005-01-01

    The best dose-fractionation regimen of the definitive radiotherapy for cervix cancer remains to be clearly determined. It seems to be partially attributed to the complexity of the affecting factors and the lack of detailed information on external and intra-cavitary fractionation. To find optimal practice guidelines, our experiences of the combination of external beam radiotherapy (EBRT) and high-dose-rate intracavitary brachytherapy (HDR-ICBT) were reviewed with detailed information of the various treatment parameters obtained from a large cohort of women treated homogeneously at a single institute. The subjects were 743 cervical cancer patients (Stage IB 198, IIA 77, IIB 364, IIIA 7, IIIB 89 and IVA 8) treated by radiotherapy alone, between 1990 and 1996. A total external beam radiotherapy (EBRT) dose of 23.4 ∼ 59.4 Gy (Median 45.0) was delivered to the whole pelvis. High-dose-rate intracavitary brachytherapy (HDR-ICBT) was also performed using various fractionation schemes. A Midline block (MLB) was initiated after the delivery of 14.4∼ 43.2 Gy (Median 36.0) of EBRT in 495 patients, while in the other 248 patients EBRT could not be used due to slow tumor regression or the huge initial bulk of tumor. The point A, actual bladder and rectal doses were individually assessed in all patients. The biologically effective dose (BED) to the tumor (α / β = 10) and late-responding tissues (α /β = 3) for both EBRT and HDR-ICBT were calculated. The total BED values to point A, the actual bladder and rectal reference points were the summation of the EBRT and HDR-ICBT. In addition to all the details on dose-fractionation, the other factors (i.e. the overall treatment time, physicians preference) that can affect the schedule of the definitive radiotherapy were also thoroughly analyzed. The association between MD-BED Gy 3 and the risk of complication was assessed using serial multiple logistic regressions models. The associations between R-BED Gy 3 and rectal complications

  8. Machine scheduling to minimize weighted completion times the use of the α-point

    CERN Document Server

    Gusmeroli, Nicoló

    2018-01-01

    This work reviews the most important results regarding the use of the α-point in Scheduling Theory. It provides a number of different LP-relaxations for scheduling problems and seeks to explain their polyhedral consequences. It also explains the concept of the α-point and how the conversion algorithm works, pointing out the relations to the sum of the weighted completion times. Lastly, the book explores the latest techniques used for many scheduling problems with different constraints, such as release dates, precedences, and parallel machines. This reference book is intended for advanced undergraduate and postgraduate students who are interested in scheduling theory. It is also inspiring for researchers wanting to learn about sophisticated techniques and open problems of the field.

  9. Travel time and concurrent-schedule choice: retrospective versus prospective control.

    OpenAIRE

    Davison, M; Elliffe, D

    2000-01-01

    Six pigeons were trained on concurrent variable-interval schedules in which two different travel times between alternatives, 4.5 and 0.5 s, were randomly arranged. In Part 1, the next travel time was signaled while the subjects were responding on each alternative. Generalized matching analyses of performance in the presence of the two travel-time signals showed significantly higher response and time sensitivity when the longer travel time was signaled compared to when the shorter time was sig...

  10. Constraints in the use of repair half times and mathematical modelling for the clinical application of HDR and PDR treatment schedules as an alternative for LDR brachytherapy

    International Nuclear Information System (INIS)

    Pop, L.A.M.; Broek, J.F.C.M. van den; Visser, A.G.; Kogel, A.J. van der

    1996-01-01

    Using theoretical models based on radiobiological principles for the design of new treatment schedules for HDR and PDR brachytherapy, it is important to realise the impact of assumptions regarding the kinetics of repair. Extrapolations based on longer repair half times in a continuous LDR reference scheme may lead to the calculation of dangerously high doses for alternative HDR and PDR treatment schedules. We used the clinical experience obtained with conventional ERT and LDR brachytherapy in head and neck cancer as a clinical guideline to check the impact of the radiobiological parameters used. Biologically equivalent dose (BED) values for the in clinical practice of LDR brachytherapy recommended dose of 65-70 Gy (prescribed at a dose rate between 30-50 cGy/h) are calculated as a function of the repair half time. These BED values are compared with the biological effect of a clinical reference dose of conventional ERT with 2 Gy/day and complete repair between the fractions. From this comparison of LDR and ERT treatment schedules, a range of values for the repair half times of acute or late responding tissues is demarcated with a reasonable fit to the clinical data. For the acute effects (or tumor control) the best fits are obtained for repair half times of about 0.5 h, while for late effects the repair half times are at least 1 h and can be as high as 3 h. Within these ranges of repair half times for acute and late effects, the outcome of 'alternative' HDR or PDR treatment schedules are discussed. It is predominantly the late reacting normal tissue with the longer repair half time for which problems will be encountered and no or only marginal gain is to be expected of decreasing the dose rate per pulse in PDR brachytherapy

  11. Run-Time HW/SW Scheduling of Data Flow Applications on Reconfigurable Architectures

    Directory of Open Access Journals (Sweden)

    Ghaffari Fakhreddine

    2009-01-01

    Full Text Available This paper presents an efficient dynamic and run-time Hardware/Software scheduling approach. This scheduling heuristic consists in mapping online the different tasks of a highly dynamic application in such a way that the total execution time is minimized. We consider soft real-time data flow graph oriented applications for which the execution time is function of the input data nature. The target architecture is composed of two processors connected to a dynamically reconfigurable hardware accelerator. Our approach takes advantage of the reconfiguration property of the considered architecture to adapt the treatment to the system dynamics. We compare our heuristic with another similar approach. We present the results of our scheduling method on several image processing applications. Our experiments include simulation and synthesis results on a Virtex V-based platform. These results show a better performance against existing methods.

  12. Reliable gain-scheduled control of discrete-time systems and its application to CSTR model

    Science.gov (United States)

    Sakthivel, R.; Selvi, S.; Mathiyalagan, K.; Shi, Y.

    2016-10-01

    This paper is focused on reliable gain-scheduled controller design for a class of discrete-time systems with randomly occurring nonlinearities and actuator fault. Further, the nonlinearity in the system model is assumed to occur randomly according to a Bernoulli distribution with measurable time-varying probability in real time. The main purpose of this paper is to design a gain-scheduled controller by implementing a probability-dependent Lyapunov function and linear matrix inequality (LMI) approach such that the closed-loop discrete-time system is stochastically stable for all admissible randomly occurring nonlinearities. The existence conditions for the reliable controller is formulated in terms of LMI constraints. Finally, the proposed reliable gain-scheduled control scheme is applied on continuously stirred tank reactor model to demonstrate the effectiveness and applicability of the proposed design technique.

  13. Relative performance of priority rules for hybrid flow shop scheduling with setup times

    Directory of Open Access Journals (Sweden)

    Helio Yochihiro Fuchigami

    2015-12-01

    Full Text Available This paper focuses the hybrid flow shop scheduling problem with explicit and sequence-independent setup times. This production environment is a multistage system with unidirectional flow of jobs, wherein each stage may contain multiple machines available for processing. The optimized measure was the total time to complete the schedule (makespan. The aim was to propose new priority rules to support the schedule and to evaluate their relative performance at the production system considered by the percentage of success, relative deviation, standard deviation of relative deviation, and average CPU time. Computational experiments have indicated that the rules using ascending order of the sum of processing and setup times of the first stage (SPT1 and SPT1_ERD performed better, reaching together more than 56% of success.

  14. An Arrival and Departure Time Predictor for Scheduling Communication in Opportunistic IoT

    Science.gov (United States)

    Pozza, Riccardo; Georgoulas, Stylianos; Moessner, Klaus; Nati, Michele; Gluhak, Alexander; Krco, Srdjan

    2016-01-01

    In this article, an Arrival and Departure Time Predictor (ADTP) for scheduling communication in opportunistic Internet of Things (IoT) is presented. The proposed algorithm learns about temporal patterns of encounters between IoT devices and predicts future arrival and departure times, therefore future contact durations. By relying on such predictions, a neighbour discovery scheduler is proposed, capable of jointly optimizing discovery latency and power consumption in order to maximize communication time when contacts are expected with high probability and, at the same time, saving power when contacts are expected with low probability. A comprehensive performance evaluation with different sets of synthetic and real world traces shows that ADTP performs favourably with respect to previous state of the art. This prediction framework opens opportunities for transmission planners and schedulers optimizing not only neighbour discovery, but the entire communication process. PMID:27827909

  15. An Arrival and Departure Time Predictor for Scheduling Communication in Opportunistic IoT.

    Science.gov (United States)

    Pozza, Riccardo; Georgoulas, Stylianos; Moessner, Klaus; Nati, Michele; Gluhak, Alexander; Krco, Srdjan

    2016-11-04

    In this article, an Arrival and Departure Time Predictor (ADTP) for scheduling communication in opportunistic Internet of Things (IoT) is presented. The proposed algorithm learns about temporal patterns of encounters between IoT devices and predicts future arrival and departure times, therefore future contact durations. By relying on such predictions, a neighbour discovery scheduler is proposed, capable of jointly optimizing discovery latency and power consumption in order to maximize communication time when contacts are expected with high probability and, at the same time, saving power when contacts are expected with low probability. A comprehensive performance evaluation with different sets of synthetic and real world traces shows that ADTP performs favourably with respect to previous state of the art. This prediction framework opens opportunities for transmission planners and schedulers optimizing not only neighbour discovery, but the entire communication process.

  16. ARTiS, an Asymmetric Real-Time Scheduler for Linux on Multi-Processor Architectures

    OpenAIRE

    Piel , Éric; Marquet , Philippe; Soula , Julien; Osuna , Christophe; Dekeyser , Jean-Luc

    2005-01-01

    The ARTiS system is a real-time extension of the GNU/Linux scheduler dedicated to SMP (Symmetric Multi-Processors) systems. It allows to mix High Performance Computing and real-time. ARTiS exploits the SMP architecture to guarantee the preemption of a processor when the system has to schedule a real-time task. The implementation is available as a modification of the Linux kernel, especially focusing (but not restricted to) IA-64 architecture. The basic idea of ARTiS is to assign a selected se...

  17. Discordance between 'actual' and 'scheduled' check-in times at a heart failure clinic.

    Directory of Open Access Journals (Sweden)

    Eiran Z Gorodeski

    Full Text Available A 2015 Institute Of Medicine statement "Transforming Health Care Scheduling and Access: Getting to Now", has increased concerns regarding patient wait times. Although waiting times have been widely studied, little attention has been paid to the role of patient arrival times as a component of this phenomenon. To this end, we investigated patterns of patient arrival at scheduled ambulatory heart failure (HF clinic appointments and studied its predictors. We hypothesized that patients are more likely to arrive later than scheduled, with progressively later arrivals later in the day.Using a business intelligence database we identified 6,194 unique patients that visited the Cleveland Clinic Main Campus HF clinic between January, 2015 and January, 2017. This clinic served both as a tertiary referral center and a community HF clinic. Transplant and left ventricular assist device (LVAD visits were excluded. Punctuality was defined as the difference between 'actual' and 'scheduled' check-in times, whereby negative values (i.e., early punctuality were patients who checked-in early. Contrary to our hypothesis, we found that patients checked-in late only a minority of the time (38% of visits. Additionally, examining punctuality by appointment hour slot we found that patients scheduled after 8AM had progressively earlier check-in times as the day progressed (P < .001 for trend. In both a Random Forest-Regression framework and linear regression models the most important risk-adjusted predictors of early punctuality were: later in the day appointment hour slot, patient having previously been to the hospital, age in the early 70s, and white race.Patients attending a mixed population ambulatory HF clinic check-in earlier than scheduled times, with progressive discrepant intervals throughout the day. This finding may have significant implications for provider utilization and resource planning in order to maximize clinic efficiency. The impact of elective early

  18. Discordance between 'actual' and 'scheduled' check-in times at a heart failure clinic.

    Science.gov (United States)

    Gorodeski, Eiran Z; Joyce, Emer; Gandesbery, Benjamin T; Blackstone, Eugene H; Taylor, David O; Tang, W H Wilson; Starling, Randall C; Hachamovitch, Rory

    2017-01-01

    A 2015 Institute Of Medicine statement "Transforming Health Care Scheduling and Access: Getting to Now", has increased concerns regarding patient wait times. Although waiting times have been widely studied, little attention has been paid to the role of patient arrival times as a component of this phenomenon. To this end, we investigated patterns of patient arrival at scheduled ambulatory heart failure (HF) clinic appointments and studied its predictors. We hypothesized that patients are more likely to arrive later than scheduled, with progressively later arrivals later in the day. Using a business intelligence database we identified 6,194 unique patients that visited the Cleveland Clinic Main Campus HF clinic between January, 2015 and January, 2017. This clinic served both as a tertiary referral center and a community HF clinic. Transplant and left ventricular assist device (LVAD) visits were excluded. Punctuality was defined as the difference between 'actual' and 'scheduled' check-in times, whereby negative values (i.e., early punctuality) were patients who checked-in early. Contrary to our hypothesis, we found that patients checked-in late only a minority of the time (38% of visits). Additionally, examining punctuality by appointment hour slot we found that patients scheduled after 8AM had progressively earlier check-in times as the day progressed (P < .001 for trend). In both a Random Forest-Regression framework and linear regression models the most important risk-adjusted predictors of early punctuality were: later in the day appointment hour slot, patient having previously been to the hospital, age in the early 70s, and white race. Patients attending a mixed population ambulatory HF clinic check-in earlier than scheduled times, with progressive discrepant intervals throughout the day. This finding may have significant implications for provider utilization and resource planning in order to maximize clinic efficiency. The impact of elective early arrival on

  19. Uncertain travel times and activity schedules under conditions of space-time constraints and invariant choice heuristics

    NARCIS (Netherlands)

    Rasouli, S.; Timmermans, H.J.P.

    2014-01-01

    The aim of this paper is to assess the impact of uncertain travel times as reflected in travel time variability on the outcomes of individuals’ activity–travel scheduling decisions, assuming they are faced with fixed space–time constraints and apply the set of decision rules that they have developed

  20. Effectiveness of Time-Based Attention Schedules on Students in Inclusive Classrooms in Turkey

    Science.gov (United States)

    Sazak Pinar, Elif

    2015-01-01

    This study examines the effectiveness of fixed-time (FT) and variable-time (VT) schedules and attention on the problem behaviors and on-task behaviors of students with and without intellectual disabilities in inclusive classrooms in Turkey. Three second-grade students with intellectual disabilities, three students without intellectual…

  1. One-machine job-scheduling with non-constant capacity - Minimizing weighted completion times

    NARCIS (Netherlands)

    Amaddeo, H.F.; Amaddeo, H.F.; Nawijn, W.M.; van Harten, Aart

    1997-01-01

    In this paper an n-job one-machine scheduling problem is considered, in which the machine capacity is time-dependent and jobs are characterized by their work content. The objective is to minimize the sum of weighted completion times. A necessary optimality condition is presented and we discuss some

  2. A Study on the Enhanced Best Performance Algorithm for the Just-in-Time Scheduling Problem

    Directory of Open Access Journals (Sweden)

    Sivashan Chetty

    2015-01-01

    Full Text Available The Just-In-Time (JIT scheduling problem is an important subject of study. It essentially constitutes the problem of scheduling critical business resources in an attempt to optimize given business objectives. This problem is NP-Hard in nature, hence requiring efficient solution techniques. To solve the JIT scheduling problem presented in this study, a new local search metaheuristic algorithm, namely, the enhanced Best Performance Algorithm (eBPA, is introduced. This is part of the initial study of the algorithm for scheduling problems. The current problem setting is the allocation of a large number of jobs required to be scheduled on multiple and identical machines which run in parallel. The due date of a job is characterized by a window frame of time, rather than a specific point in time. The performance of the eBPA is compared against Tabu Search (TS and Simulated Annealing (SA. SA and TS are well-known local search metaheuristic algorithms. The results show the potential of the eBPA as a metaheuristic algorithm.

  3. Energy-Aware Synthesis of Fault-Tolerant Schedules for Real-Time Distributed Embedded Systems

    DEFF Research Database (Denmark)

    Poulsen, Kåre Harbo; Pop, Paul; Izosimov, Viacheslav

    2007-01-01

    This paper presents a design optimisation tool for distributed embedded real-time systems that 1) decides mapping, fault-tolerance policy and generates a fault-tolerant schedule, 2) is targeted for hard real-time, 3) has hard reliability goal, 4) generates static schedule for processes and messages......, 5) provides fault-tolerance for k transient/soft faults, 6) optimises for minimal energy consumption, while considering impact of lowering voltages on the probability of faults, 7) uses constraint logic programming (CLP) based implementation....

  4. tms-sim – Timing Models Scheduling Simulation Framework – Release 2016-07

    OpenAIRE

    Kluge, Florian

    2016-01-01

    tms-sim is a framework for the simulation and evaluation of scheduling algorithms. It is being developed to support our work on real-time task scheduling based on time-utility and history-cognisant utility functions. We publish tms-sim under the conditions of the GNU GPL to make our results reproducible and in the hope that it may be useful for others. This report describes the usage of the TMS framework libraries and how they can be used to build further simulation environments. It is not in...

  5. tms-sim - Timing Models Scheduling Simulation Framework: Release 2014-12

    OpenAIRE

    Kluge, Florian

    2015-01-01

    tms-sim is a framework for the simulation and evaluation of scheduling algorithms. It is being developed to support our work on real-time task scheduling based on time-utility and history-cognisant utility functions. We publish tms-sim under the conditions of the GNU GPL to make our results reproducible and in the hope that it may be useful for others. This report describes the usage of the TMS framework libraries and how they can be used to build further simulation environments. It is not in...

  6. Real-Time Pricing-Based Scheduling Strategy in Smart Grids: A Hierarchical Game Approach

    Directory of Open Access Journals (Sweden)

    Jie Yang

    2014-01-01

    Full Text Available This paper proposes a scheduling strategy based on real-time pricing in smart grids. A hierarchical game is employed to analyze the decision-making process of generators and consumers. We prove the existence and uniqueness of Nash equilibrium and utilize a backward induction method to obtain the generation and consumption strategies. Then, we propose two dynamic algorithms for the generators and consumers to search for the equilibrium in a distributed fashion. Simulation results demonstrate that the proposed scheduling strategy can match supply with demand and shift load away from peak time.

  7. An adaptive large neighborhood search heuristic for the pickup and delivery problem with time Windows and scheduled lines

    NARCIS (Netherlands)

    Ghilas, V.; Demir, E.; van Woensel, T.

    2016-01-01

    The Pickup and Delivery Problem with Time Windows and Scheduled Lines (PDPTW-SL) concerns scheduling a set of vehicles to serve freight requests such that a part of the journey can be carried out on a scheduled public transportation line. Due to the complexity of the problem, which is NP-hard, we

  8. Evolving from Planning and Scheduling to Real-Time Operations Support: Design Challenges

    Science.gov (United States)

    Marquez, Jessica J.; Ludowise, Melissa; McCurdy, Michael; Li, Jack

    2010-01-01

    Versions of Scheduling and Planning Interface for Exploration (SPIFe) have supported a variety of mission operations across NASA. This software tool has evolved and matured over several years, assisting planners who develop intricate schedules. While initially conceived for surface Mars missions, SPIFe has been deployed in other domains, where people rather than robotic explorers, execute plans. As a result, a diverse set of end-users has compelled growth in a new direction: supporting real-time operations. This paper describes the new needs and challenges that accompany this development. Among the key features that have been built for SPIFe are current time indicators integrated into the interface and timeline, as well as other plan attributes that enable execution of scheduled activities. Field tests include mission support for the Lunar CRater Observation and Sensing Satellite (LCROSS), NASA Extreme Environment Mission Operations (NEEMO) and Desert Research and Technology Studies (DRATS) campaigns.

  9. Investigations of timing during the schedule and reinforcement intervals with wheel-running reinforcement.

    Science.gov (United States)

    Belke, Terry W; Christie-Fougere, Melissa M

    2006-11-01

    Across two experiments, a peak procedure was used to assess the timing of the onset and offset of an opportunity to run as a reinforcer. The first experiment investigated the effect of reinforcer duration on temporal discrimination of the onset of the reinforcement interval. Three male Wistar rats were exposed to fixed-interval (FI) 30-s schedules of wheel-running reinforcement and the duration of the opportunity to run was varied across values of 15, 30, and 60s. Each session consisted of 50 reinforcers and 10 probe trials. Results showed that as reinforcer duration increased, the percentage of postreinforcement pauses longer than the 30-s schedule interval increased. On probe trials, peak response rates occurred near the time of reinforcer delivery and peak times varied with reinforcer duration. In a second experiment, seven female Long-Evans rats were exposed to FI 30-s schedules leading to 30-s opportunities to run. Timing of the onset and offset of the reinforcement period was assessed by probe trials during the schedule interval and during the reinforcement interval in separate conditions. The results provided evidence of timing of the onset, but not the offset of the wheel-running reinforcement period. Further research is required to assess if timing occurs during a wheel-running reinforcement period.

  10. Towards best-case response times of real-time tasks under fixed-priority scheduling with deferred preemption

    NARCIS (Netherlands)

    Bril, R.J.; Verhaegh, W.F.J.; Puaut, I.

    2005-01-01

    In this paper, we present lower bounds for best-case response times of periodic tasks under fixed-priority scheduling with deferred preemption (FPDS) and arbitrary phasing. Our analysis is based on a dedicated conjecture for a ¿-optimal instant, and uses the notion of best-case occupied time. We

  11. Collaborative Scheduling between OSPPs and Gasholders in Steel Mill under Time-of-Use Power Price

    Directory of Open Access Journals (Sweden)

    Juxian Hao

    2017-08-01

    Full Text Available Byproduct gases generated during steel production process are the main fuels for on-site power plants (OSPPs in steel enterprises. Recently, with the implementation of time-of-use (TOU power price in China, increasing attention has been paid to the collaborative scheduling between OSPPs and gasholders. However, the load shifting potential of OSPPs has seldom been discussed in previous studies. In this paper, a mixed integer linear programming (MILP-based scheduling model is built to evaluate the load shifting potential and the corresponding economic benefits. A case study is conducted on two steel enterprises with different configurations of OSPPs, and the optimal operation strategy is also discussed.

  12. Extending an open-source real-time operating system with hierarchical scheduling

    NARCIS (Netherlands)

    Holenderski, M.J.; Cools, W.A.; Bril, R.J.; Lukkien, J.J.

    2010-01-01

    Hierarchical scheduling frameworks (HSFs) have been devised to support the integration of independently developed and analyzed subsystems. This paper presents an efficient, modular and extendible design for enhancing a real-time operating system with periodic tasks, two-level fixed-priority HSF

  13. A new continuous-time formulation for scheduling crude oil operations

    International Nuclear Information System (INIS)

    Reddy, P. Chandra Prakash; Karimi, I.A.; Srinivasan, R.

    2004-01-01

    In today's competitive business climate characterized by uncertain oil markets, responding effectively and speedily to market forces, while maintaining reliable operations, is crucial to a refinery's bottom line. Optimal crude oil scheduling enables cost reduction by using cheaper crudes intelligently, minimizing crude changeovers, and avoiding ship demurrage. So far, only discrete-time formulations have stood up to the challenge of this important, nonlinear problem. A continuous-time formulation would portend numerous advantages, however, existing work in this area has just begun to scratch the surface. In this paper, we present the first complete continuous-time mixed integer linear programming (MILP) formulation for the short-term scheduling of operations in a refinery that receives crude from very large crude carriers via a high-volume single buoy mooring pipeline. This novel formulation accounts for real-world operational practices. We use an iterative algorithm to eliminate the crude composition discrepancy that has proven to be the Achilles heel for existing formulations. While it does not guarantee global optimality, the algorithm needs only MILP solutions and obtains excellent maximum-profit schedules for industrial problems with up to 7 days of scheduling horizon. We also report the first comparison of discrete- vs. continuous-time formulations for this complex problem. (Author)

  14. Time-optimum packet scheduling for many-to-one routing in wireless sensor networks

    Science.gov (United States)

    Song, W.-Z.; Yuan, F.; LaHusen, R.; Shirazi, B.

    2007-01-01

    This paper studies the wireless sensor networks (WSN) application scenario with periodical traffic from all sensors to a sink. We present a time-optimum and energy-efficient packet scheduling algorithm and its distributed implementation. We first give a general many-to-one packet scheduling algorithm for wireless networks, and then prove that it is time-optimum and costs [image omitted], N(u0)-1) time slots, assuming each node reports one unit of data in each round. Here [image omitted] is the total number of sensors, while [image omitted] denotes the number of sensors in a sink's largest branch subtree. With a few adjustments, we then show that our algorithm also achieves time-optimum scheduling in heterogeneous scenarios, where each sensor reports a heterogeneous amount of data in each round. Then we give a distributed implementation to let each node calculate its duty-cycle locally and maximize efficiency globally. In this packet-scheduling algorithm, each node goes to sleep whenever it is not transceiving, so that the energy waste of idle listening is also mitigated. Finally, simulations are conducted to evaluate network performance using the Qualnet simulator. Among other contributions, our study also identifies the maximum reporting frequency that a deployed sensor network can handle.

  15. On-line scheduling of two-machine open shops where jobs arrive over time

    NARCIS (Netherlands)

    Chen, B.; Vestjens, A.P.A.; Woeginger, G.J.

    1998-01-01

    We investigate the problem of on-line scheduling two-machine open shops with the objective of minimizing the makespan.Jobs arrive independently over time, and the existence of a job is not known until its arrival. In the clairvoyant on-line model, the processing requirement of every job becomes

  16. Protocol-transparent resource sharing in hierarchically scheduled real-time systems

    NARCIS (Netherlands)

    Heuvel, van den M.M.H.P.; Bril, R.J.; Lukkien, J.J.

    2010-01-01

    Hierarchical scheduling frameworks (HSFs) provide means for composing complex real-time systems from well-defined, independently analyzed subsystems. To support resource sharing within two-level HSFs, three synchronization protocols based on the stack resource policy (SRP) have recently been

  17. Single-machine scheduling with release dates, due dates and family setup times

    NARCIS (Netherlands)

    Schutten, Johannes M.J.; van de Velde, S.L.; van de Velde, S.L.; Zijm, Willem H.M.

    1996-01-01

    We address the NP-hard problem of scheduling n independent jobs with release dates, due dates, and family setup times on a single machine to minimize the maximum lateness. This problem arises from the constant tug-of-war going on in manufacturing between efficient production and delivery

  18. Flexibility Driven Scheduling and Mapping for Distributed Real-Time Systems

    DEFF Research Database (Denmark)

    Pop, Paul; Eles, Petru; Peng, Zebo

    2002-01-01

    In this paper we present an approach to mapping and scheduling of distributed hard real-time systems, aiming at improving the flexibility of the design process. We consider an incremental design process that starts from an already existing system running a set of applications, with preemptive...

  19. Schedulability-Driven Partitioning and Mapping for Multi-Cluster Real-Time Systems

    DEFF Research Database (Denmark)

    Pop, Paul; Eles, Petru; Peng, Zebo

    2004-01-01

    We present an approach to partitioning and mapping for multi-cluster embedded systems consisting of time-triggered and event-triggered clusters, interconnected via gateways. We have proposed a schedulability analysis for such systems, including a worst-case queuing delay analysis for the gateways...

  20. Single-machine scheduling with release dates, due dates, and family setup times

    NARCIS (Netherlands)

    J.M.J. Schutten (Marco); S.L. van de Velde (Steef); W.H.M. Zijm

    1996-01-01

    textabstractWe address the NP-hard problem of scheduling n independent jobs with release dates, due dates, and family setup times on a single machine to minimize the maximum lateness. This problem arises from the constant tug-of-war going on in manufacturing between efficient production and delivery

  1. Analysis of nonlinear systems with time varying inputs and its application to gain scheduling

    Directory of Open Access Journals (Sweden)

    J.-T. Lim

    1996-01-01

    Full Text Available An analytical framework for analysis of a class of nonlinear systems with time varying inputs is presented. It is shown that the trajectories of the transformed nonlinear systems are uniformly bounded with an ultimate bound under certain conditions shown in this paper. The result obtained is useful for applications, in particular, analysis and design of gain scheduling.

  2. Power/performance trade-offs in real-time SDRAM command scheduling

    OpenAIRE

    Goossens, S.L.M.; Chandrasekar, K.; Akesson, K.B.; Goossens, K.G.W.

    2016-01-01

    Real-time safety-critical systems should provide hard bounds on an applications’ performance. SDRAM controllers used in this domain should therefore have a bounded worst-case bandwidth, response time, and power consumption. Existing works on real-time SDRAM controllers only consider a narrow range of memory devices, and do not evaluate how their schedulers’ performance varies across memory generations, nor how the scheduling algorithm influences power usage. The extent to which the number of ...

  3. Scheduling and Mapping in an Incremental Design Methodology for Distributed Real-Time Embedded Systems

    DEFF Research Database (Denmark)

    Pop, Paul; Eles, Petru; Peng, Zebo

    2004-01-01

    In this paper we present an approach to mapping and scheduling of distributed embedded systems for hard real-time applications, aiming at a minimization of the system modification cost. We consider an incremental design process that starts from an already existing system running a set of applicat......In this paper we present an approach to mapping and scheduling of distributed embedded systems for hard real-time applications, aiming at a minimization of the system modification cost. We consider an incremental design process that starts from an already existing system running a set...... be added to the resulted system. Thus, we propose a heuristic which finds the set of already running applications which have to be remapped and rescheduled at the same time with mapping and scheduling the new application, such that the disturbance on the running system (expressed as the total cost implied...... by the modifications) is minimized. Once this set of applications has been determined, we outline a mapping and scheduling algorithm aimed at fulfilling the requirements stated above. The approaches have been evaluated based on extensive experiments using a large number of generated benchmarks as well as a real...

  4. Phase I trial of strictly time-scheduled gemcitabine and cisplatin with concurrent radiotherapy in patients with locally advanced pancreatic cancer

    International Nuclear Information System (INIS)

    Brunner, Thomas B.; Grabenbauer, Gerhard G.; Klein, Peter; Baum, Ulrich; Papadopoulos, Thomas; Bautz, Werner; Hohenberger, Werner; Sauer, Rolf

    2003-01-01

    Purpose: Maximal therapeutic gain in xenograft sarcoma and toxicity for jejunal mucosa is time dependent for concurrent gemcitabine and radiotherapy (RT). We used a time-dependent schedule to determine the maximal-tolerated dose and dose-limiting toxicities (DLTs; Grade 4 hematologic or Grade 3 other toxicity). Methods and Materials: Patients with pancreatic cancer (n=33), periampullary carcinoma (n=1), or bile duct cancer (n=2) were treated with 3-day conformal RT with 50.4 Gy (tumor, lymphatics) plus a 5.4-Gy boost. Concurrent cisplatin (20 mg/m 2 /d on Days 1-5 and 29-33) and gemcitabine (initially 600 mg/m 2 , weekly on Fridays 68 h before RT) were administered. Because of DLT, the doses were reduced to 500 mg/m 2 weekly and then 500, 400, or 300 mg/m 2 on Days 2, 5, 26, 33. Results: DLT occurred at all dose levels of gemcitabine >300 mg/m 2 . Fourteen patients were treated at the recommended Phase II dose of gemcitabine (300 mg/m 2 ) without DLT. The response to chemoradiation allowed 10 of 30 initially unresectable patients with primary pancreatic carcinoma to undergo radical surgery, including a complete response in 2 cases. Conclusions: At the recommended Phase II dose, chemoradiation with gemcitabine and cisplatin can be administered safely in pancreatic carcinoma. However, at higher dose levels, toxicity is severe and frequent. Patients with a chance for conversion to resection could benefit from this schedule

  5. Incorporating activity-travel time uncertainty and stochastic space-time prisms in multistate supernetworks for activity-travel scheduling

    NARCIS (Netherlands)

    Liao, F.; Rasouli, S.; Timmermans, H.J.P.

    2014-01-01

    Multistate supernetwork approach has been advanced recently to study multimodal, multi-activity travel behavior. The approach allows simultaneously modeling multiple choice facets pertaining to activity-travel scheduling behavior, subject to space-time constraints, in the context of full daily

  6. Efficient bounding schemes for the two-center hybrid flow shop scheduling problem with removal times.

    Science.gov (United States)

    Hidri, Lotfi; Gharbi, Anis; Louly, Mohamed Aly

    2014-01-01

    We focus on the two-center hybrid flow shop scheduling problem with identical parallel machines and removal times. The job removal time is the required duration to remove it from a machine after its processing. The objective is to minimize the maximum completion time (makespan). A heuristic and a lower bound are proposed for this NP-Hard problem. These procedures are based on the optimal solution of the parallel machine scheduling problem with release dates and delivery times. The heuristic is composed of two phases. The first one is a constructive phase in which an initial feasible solution is provided, while the second phase is an improvement one. Intensive computational experiments have been conducted to confirm the good performance of the proposed procedures.

  7. Efficient Feasibility Analysis for Real-Time Systems with EDF Scheduling

    OpenAIRE

    Albers , Karsten; Slomka , Frank

    2005-01-01

    Submitted on behalf of EDAA (http://www.edaa.com/); International audience; This paper presents new fast exact feasibility tests for uniprocessor real-time systems using preemptive EDF scheduling. Task sets which are accepted by previously described sufficient tests will be evaluated in nearly the same time as with the old tests by the new algorithms. Many task sets are not accepted by the earlier tests despite them beeing feasible. These task sets will be evaluated by the new algorithms a lo...

  8. Compositional schedulability analysis of real-time actor-based systems.

    Science.gov (United States)

    Jaghoori, Mohammad Mahdi; de Boer, Frank; Longuet, Delphine; Chothia, Tom; Sirjani, Marjan

    2017-01-01

    We present an extension of the actor model with real-time, including deadlines associated with messages, and explicit application-level scheduling policies, e.g.,"earliest deadline first" which can be associated with individual actors. Schedulability analysis in this setting amounts to checking whether, given a scheduling policy for each actor, every task is processed within its designated deadline. To check schedulability, we introduce a compositional automata-theoretic approach, based on maximal use of model checking combined with testing. Behavioral interfaces define what an actor expects from the environment, and the deadlines for messages given these assumptions. We use model checking to verify that actors match their behavioral interfaces. We extend timed automata refinement with the notion of deadlines and use it to define compatibility of actor environments with the behavioral interfaces. Model checking of compatibility is computationally hard, so we propose a special testing process. We show that the analyses are decidable and automate the process using the Uppaal model checker.

  9. Optimized Scheduling of Smart Meter Data Access for Real-time Voltage Quality Monitoring

    DEFF Research Database (Denmark)

    Kemal, Mohammed Seifu; Olsen, Rasmus Løvenstein; Schwefel, Hans-Peter

    2018-01-01

    Abstract—Active low-voltage distribution grids that support high integration of distributed generation such as photovoltaics and wind turbines require real-time voltage monitoring. At the same time, countries in Europe such as Denmark have close to 100% rollout of smart metering infrastructure....... The metering infrastructure has limitations to provide real-time measurements with small-time granularity. This paper presents an algorithm for optimized scheduling of smart meter data access to provide real-time voltage quality monitoring. The algorithm is analyzed using a real distribution grid in Denmark...

  10. The Simultaneous Vehicle Scheduling and Passenger Service Problem with Flexible Dwell Times

    DEFF Research Database (Denmark)

    Fonseca, Joao Filipe Paiva; Larsen, Allan; van der Hurk, Evelien

    In this talk, we deal with a generalization of the well-known Vehicle Scheduling Problem(VSP) that we call Simultaneous Vehicle Scheduling and Passenger Service Problem with Flexible Dwell Times (SVSPSP-FDT). The SVSPSP-FDT generalizes the VSP because the original timetables of the trips can...... be changed (i.e., shifted and stretched) in order to minimize a new objective function that aims at minimizing the operational costs plus the waiting times of the passengers at transfer points. Contrary to most generalizations of the VSP, the SVSPSP-FDT establishes the possibility of changing trips' dwell...... times at important transfer points based on expected passenger ows. We introduce a compact mixed integer linear formulation of the SVSPSP-FDT able to address small instances. We also present a meta-heuristic approach to solve medium/large instances of the problem. The e ectiveness of the proposed...

  11. Broadcast Scheduling Strategy Based on the Priority of Real.Time Data in a Mobile Environment

    Institute of Scientific and Technical Information of China (English)

    YangJin-cait; LiuYun-sheng

    2003-01-01

    Data broadcast is an important data dissemination approach in mobile environment. On broadcast channel,scalability and efficiency of data transmission are satisfied. In a mobile environment, there exists a kind of real-time database application in which both the transactions and data can have their timing constraints and priorities of different levels.In order to meet the requirement of real-time data disseminaring and retrieving, a broadcast scheduling strategy HPF-ED F (Highest Priority First with Earlier Deadline and Frequency) is proposed under the BoD (Broadcast on Demand) model. Using the strategy, data items are scheduled according to their priority the transaction imposed on them or system set for them. The strategy also considers other characteristics of data items such as deadline and popularity of data. The extensive simulation experiments have been conducted to evaluate the performance of the proposed algorithm. Results show that it can achieve excellent performance compared with existing strategies.

  12. A comparative study of itraconazole in various dose schedules in the treatment of pulmonary aspergilloma in treated patients of pulmonary tuberculosis

    Directory of Open Access Journals (Sweden)

    Prahlad Rai Gupta

    2015-01-01

    Full Text Available Introduction: The optimal dose, duration, and efficacy of itraconazole in Indian patients of pulmonary aspergilloma (PA are not clearly defined. Therefore, a study was carried out, to resolve these issues in diagnosed cases of PA complicating old treated patients of pulmonary tuberculosis. Materials and Methods: The study patients randomly received itraconazole either in a fixed dose schedule of 200 mg (group I, 200 mg twice daily (group II or a variable dose schedule (group III, for 12 months. All the patients were followed up for the entire duration of the study for clinical, radiological, and immunological response. The side effects were recorded as and when reported by the patients and managed symptomatically. Results: A total of 60 patients were enrolled, 20, in each group. There were no intergroup differences with regard to age, sex, body weight, smoking status, alcohol intake, symptoms, Potassium hydroxide (KOH mount, fungal culture, pattern of radiological lesions or anti-aspergillus antibodies (anti-Asp-Ab titers. The radiological response was poor in group I patients, as compared to the other groups, at two months (P < 0.05. The dose of itraconazole was increased in five of the patients in group I due to poor response. A higher number of group II patients suffered side effects and the dose of itraconazole had to be decreased in three of these patients, but none of the patients on a variable dose schedule required a change in dose schedule. Conclusion: Thus, a weight-based variable dose schedule of itraconazole was found to be a more effective and safer modality in the management of PA than a fixed dose schedule.

  13. Project scheduling method with time using MRP system – A case study: Construction project in Libya

    Directory of Open Access Journals (Sweden)

    Abdallah Ali Imetieg

    2015-04-01

    Full Text Available Materials Requirements and Planning (MRP is a system of production planning and inventory control, which is used to manage manufacturing processes. Most MRP systems are software-based and are used to ensure that the materials are available for production, that the products are available for delivery to customers, that the lowest possible material and product level is maintained in store, as well as to plan delivery schedules and purchasing activities. Upon completion of scheduling, begins the process of follow-up, which includes the achievement of the project goals in terms of quantity, quality and costs in accordance with deadlines. MRP system was applied to project of 5000 housing units in Solug area, which is close to Benghazi city, Libya, with the aim to provide necessary cash flow to pay dues on time without delay to all involved project sub-contractors and material suppliers, to ensure the smooth flow of operations, as well as to diminish costs by reduction of temporary storages and rented areas. There is a correlation between time and cost of each activity. If the required time is shorter than the scheduled time of the certain activity, it would demand more resources, which further leads to the increase in direct costs of the given activity. Therefore, the output of MRP is important since commands are issued through planning in order to launch the suggested orders with the required quantities and within the limited time period.

  14. Performance deterioration modeling and optimal preventive maintenance strategy under scheduled servicing subject to mission time

    Directory of Open Access Journals (Sweden)

    Li Dawei

    2014-08-01

    Full Text Available Servicing is applied periodically in practice with the aim of restoring the system state and prolonging the lifetime. It is generally seen as an imperfect maintenance action which has a chief influence on the maintenance strategy. In order to model the maintenance effect of servicing, this study analyzes the deterioration characteristics of system under scheduled servicing. And then the deterioration model is established from the failure mechanism by compound Poisson process. On the basis of the system damage value and failure mechanism, the failure rate refresh factor is proposed to describe the maintenance effect of servicing. A maintenance strategy is developed which combines the benefits of scheduled servicing and preventive maintenance. Then the optimization model is given to determine the optimal servicing period and preventive maintenance time, with an objective to minimize the system expected life-cycle cost per unit time and a constraint on system survival probability for the duration of mission time. Subject to mission time, it can control the ability of accomplishing the mission at any time so as to ensure the high dependability. An example of water pump rotor relating to scheduled servicing is introduced to illustrate the failure rate refresh factor and the proposed maintenance strategy. Compared with traditional methods, the numerical results show that the failure rate refresh factor can describe the maintenance effect of servicing more intuitively and objectively. It also demonstrates that this maintenance strategy can prolong the lifetime, reduce the total lifetime maintenance cost and guarantee the dependability of system.

  15. Load Balancing Integrated Least Slack Time-Based Appliance Scheduling for Smart Home Energy Management

    Science.gov (United States)

    Silva, Bhagya Nathali; Khan, Murad; Han, Kijun

    2018-01-01

    The emergence of smart devices and smart appliances has highly favored the realization of the smart home concept. Modern smart home systems handle a wide range of user requirements. Energy management and energy conservation are in the spotlight when deploying sophisticated smart homes. However, the performance of energy management systems is highly influenced by user behaviors and adopted energy management approaches. Appliance scheduling is widely accepted as an effective mechanism to manage domestic energy consumption. Hence, we propose a smart home energy management system that reduces unnecessary energy consumption by integrating an automated switching off system with load balancing and appliance scheduling algorithm. The load balancing scheme acts according to defined constraints such that the cumulative energy consumption of the household is managed below the defined maximum threshold. The scheduling of appliances adheres to the least slack time (LST) algorithm while considering user comfort during scheduling. The performance of the proposed scheme has been evaluated against an existing energy management scheme through computer simulation. The simulation results have revealed a significant improvement gained through the proposed LST-based energy management scheme in terms of cost of energy, along with reduced domestic energy consumption facilitated by an automated switching off mechanism. PMID:29495346

  16. Load Balancing Integrated Least Slack Time-Based Appliance Scheduling for Smart Home Energy Management

    Directory of Open Access Journals (Sweden)

    Bhagya Nathali Silva

    2018-02-01

    Full Text Available The emergence of smart devices and smart appliances has highly favored the realization of the smart home concept. Modern smart home systems handle a wide range of user requirements. Energy management and energy conservation are in the spotlight when deploying sophisticated smart homes. However, the performance of energy management systems is highly influenced by user behaviors and adopted energy management approaches. Appliance scheduling is widely accepted as an effective mechanism to manage domestic energy consumption. Hence, we propose a smart home energy management system that reduces unnecessary energy consumption by integrating an automated switching off system with load balancing and appliance scheduling algorithm. The load balancing scheme acts according to defined constraints such that the cumulative energy consumption of the household is managed below the defined maximum threshold. The scheduling of appliances adheres to the least slack time (LST algorithm while considering user comfort during scheduling. The performance of the proposed scheme has been evaluated against an existing energy management scheme through computer simulation. The simulation results have revealed a significant improvement gained through the proposed LST-based energy management scheme in terms of cost of energy, along with reduced domestic energy consumption facilitated by an automated switching off mechanism.

  17. Load Balancing Integrated Least Slack Time-Based Appliance Scheduling for Smart Home Energy Management.

    Science.gov (United States)

    Silva, Bhagya Nathali; Khan, Murad; Han, Kijun

    2018-02-25

    The emergence of smart devices and smart appliances has highly favored the realization of the smart home concept. Modern smart home systems handle a wide range of user requirements. Energy management and energy conservation are in the spotlight when deploying sophisticated smart homes. However, the performance of energy management systems is highly influenced by user behaviors and adopted energy management approaches. Appliance scheduling is widely accepted as an effective mechanism to manage domestic energy consumption. Hence, we propose a smart home energy management system that reduces unnecessary energy consumption by integrating an automated switching off system with load balancing and appliance scheduling algorithm. The load balancing scheme acts according to defined constraints such that the cumulative energy consumption of the household is managed below the defined maximum threshold. The scheduling of appliances adheres to the least slack time (LST) algorithm while considering user comfort during scheduling. The performance of the proposed scheme has been evaluated against an existing energy management scheme through computer simulation. The simulation results have revealed a significant improvement gained through the proposed LST-based energy management scheme in terms of cost of energy, along with reduced domestic energy consumption facilitated by an automated switching off mechanism.

  18. Multi-Objective Flexible Flow Shop Scheduling Problem Considering Variable Processing Time due to Renewable Energy

    Directory of Open Access Journals (Sweden)

    Xiuli Wu

    2018-03-01

    Full Text Available Renewable energy is an alternative to non-renewable energy to reduce the carbon footprint of manufacturing systems. Finding out how to make an alternative energy-efficient scheduling solution when renewable and non-renewable energy drives production is of great importance. In this paper, a multi-objective flexible flow shop scheduling problem that considers variable processing time due to renewable energy (MFFSP-VPTRE is studied. First, the optimization model of the MFFSP-VPTRE is formulated considering the periodicity of renewable energy and the limitations of energy storage capacity. Then, a hybrid non-dominated sorting genetic algorithm with variable local search (HNSGA-II is proposed to solve the MFFSP-VPTRE. An operation and machine-based encoding method is employed. A low-carbon scheduling algorithm is presented. Besides the crossover and mutation, a variable local search is used to improve the offspring’s Pareto set. The offspring and the parents are combined and those that dominate more are selected to continue evolving. Finally, two groups of experiments are carried out. The results show that the low-carbon scheduling algorithm can effectively reduce the carbon footprint under the premise of makespan optimization and the HNSGA-II outperforms the traditional NSGA-II and can solve the MFFSP-VPTRE effectively and efficiently.

  19. Performance Evaluation of New Joint EDF-RM Scheduling Algorithm for Real Time Distributed System

    Directory of Open Access Journals (Sweden)

    Rashmi Sharma

    2014-01-01

    Full Text Available In Real Time System, the achievement of deadline is the main target of every scheduling algorithm. Earliest Deadline First (EDF, Rate Monotonic (RM, and least Laxity First are some renowned algorithms that work well in their own context. As we know, there is a very common problem Domino's effect in EDF that is generated due to overloading condition (EDF is not working well in overloading situation. Similarly, performance of RM is degraded in underloading condition. We can say that both algorithms are complements of each other. Deadline missing in both events happens because of their utilization bounding strategy. Therefore, in this paper we are proposing a new scheduling algorithm that carries through the drawback of both existing algorithms. Joint EDF-RM scheduling algorithm is implemented in global scheduler that permits task migration mechanism in between processors in the system. In order to check the improved behavior of proposed algorithm we perform simulation. Results are achieved and evaluated in terms of Success Ratio (SR, Average CPU Utilization (ECU, Failure Ratio (FR, and Maximum Tardiness parameters. In the end, the results are compared with the existing (EDF, RM, and D_R_EDF algorithms. It has been shown that the proposed algorithm performs better during overloading condition as well in underloading condition.

  20. Job shop scheduling model for non-identic machine with fixed delivery time to minimize tardiness

    Science.gov (United States)

    Kusuma, K. K.; Maruf, A.

    2016-02-01

    Scheduling non-identic machines problem with low utilization characteristic and fixed delivery time are frequent in manufacture industry. This paper propose a mathematical model to minimize total tardiness for non-identic machines in job shop environment. This model will be categorized as an integer linier programming model and using branch and bound algorithm as the solver method. We will use fixed delivery time as main constraint and different processing time to process a job. The result of this proposed model shows that the utilization of production machines can be increase with minimal tardiness using fixed delivery time as constraint.

  1. Minimizing Total Completion Time For Preemptive Scheduling With Release Dates And Deadline Constraints

    Directory of Open Access Journals (Sweden)

    He Cheng

    2014-02-01

    Full Text Available It is known that the single machine preemptive scheduling problem of minimizing total completion time with release date and deadline constraints is NP- hard. Du and Leung solved some special cases by the generalized Baker's algorithm and the generalized Smith's algorithm in O(n2 time. In this paper we give an O(n2 algorithm for the special case where the processing times and deadlines are agreeable. Moreover, for the case where the processing times and deadlines are disagreeable, we present two properties which could enable us to reduce the range of the enumeration algorithm

  2. Real-time distributed scheduling algorithm for supporting QoS over WDM networks

    Science.gov (United States)

    Kam, Anthony C.; Siu, Kai-Yeung

    1998-10-01

    Most existing or proposed WDM networks employ circuit switching, typically with one session having exclusive use of one entire wavelength. Consequently they are not suitable for data applications involving bursty traffic patterns. The MIT AON Consortium has developed an all-optical LAN/MAN testbed which provides time-slotted WDM service and employs fast-tunable transceivers in each optical terminal. In this paper, we explore extensions of this service to achieve fine-grained statistical multiplexing with different virtual circuits time-sharing the wavelengths in a fair manner. In particular, we develop a real-time distributed protocol for best-effort traffic over this time-slotted WDM service with near-optical fairness and throughput characteristics. As an additional design feature, our protocol supports the allocation of guaranteed bandwidths to selected connections. This feature acts as a first step towards supporting integrated services and quality-of-service guarantees over WDM networks. To achieve high throughput, our approach is based on scheduling transmissions, as opposed to collision- based schemes. Our distributed protocol involves one MAN scheduler and several LAN schedulers (one per LAN) in a master-slave arrangement. Because of propagation delays and limits on control channel capacities, all schedulers are designed to work with partial, delayed traffic information. Our distributed protocol is of the `greedy' type to ensure fast execution in real-time in response to dynamic traffic changes. It employs a hybrid form of rate and credit control for resource allocation. We have performed extensive simulations, which show that our protocol allocates resources (transmitters, receivers, wavelengths) fairly with high throughput, and supports bandwidth guarantees.

  3. An order insertion scheduling model of logistics service supply chain considering capacity and time factors.

    Science.gov (United States)

    Liu, Weihua; Yang, Yi; Wang, Shuqing; Liu, Yang

    2014-01-01

    Order insertion often occurs in the scheduling process of logistics service supply chain (LSSC), which disturbs normal time scheduling especially in the environment of mass customization logistics service. This study analyses order similarity coefficient and order insertion operation process and then establishes an order insertion scheduling model of LSSC with service capacity and time factors considered. This model aims to minimize the average unit volume operation cost of logistics service integrator and maximize the average satisfaction degree of functional logistics service providers. In order to verify the viability and effectiveness of our model, a specific example is numerically analyzed. Some interesting conclusions are obtained. First, along with the increase of completion time delay coefficient permitted by customers, the possible inserting order volume first increases and then trends to be stable. Second, supply chain performance reaches the best when the volume of inserting order is equal to the surplus volume of the normal operation capacity in mass service process. Third, the larger the normal operation capacity in mass service process is, the bigger the possible inserting order's volume will be. Moreover, compared to increasing the completion time delay coefficient, improving the normal operation capacity of mass service process is more useful.

  4. Non-uniform dwell times in line source high dose rate brachytherapy: physical and radiobiological considerations

    International Nuclear Information System (INIS)

    Jones, B.; Tan, L.T.; Freestone, G.; Bleasdale, C.; Myint, S.; Littler, J.

    1994-01-01

    The ability to vary source dwell times in high dose rate (HDR) brachytherapy allows for the use of non-uniform dwell times along a line source. This may have advantages in the radical treatment of tumours depending on individual tumour geometry. This study investigates the potential improvements in local tumour control relative to adjacent normal tissue isoeffects when intratumour source dwell times are increased along the central portion of a line source (technique A) in radiotherapy schedules which include a relatively small component of HDR brachytherapy. Such a technique is predicted to increase the local control for tumours of diameters ranging between 2 cm and 4 cm by up to 11% compared with a technique in which there are uniform dwell times along the line source (technique B). There is no difference in the local control rates for the two techniques when used to treat smaller tumours. Normal tissue doses are also modified by the technique used. Technique A produces higher normal tissue doses at points perpendicular to the centre of the line source and lower dose at points nearer the ends of the line source if the prescription point is not in the central plane of the line source. Alternatively, if the dose is prescribed at a point in the central plane of the line source, the dose at all the normal tissue points are lower when technique A is used. (author)

  5. Hard Real-Time Task Scheduling in Cloud Computing Using an Adaptive Genetic Algorithm

    Directory of Open Access Journals (Sweden)

    Amjad Mahmood

    2017-04-01

    Full Text Available In the Infrastructure-as-a-Service cloud computing model, virtualized computing resources in the form of virtual machines are provided over the Internet. A user can rent an arbitrary number of computing resources to meet their requirements, making cloud computing an attractive choice for executing real-time tasks. Economical task allocation and scheduling on a set of leased virtual machines is an important problem in the cloud computing environment. This paper proposes a greedy and a genetic algorithm with an adaptive selection of suitable crossover and mutation operations (named as AGA to allocate and schedule real-time tasks with precedence constraint on heterogamous virtual machines. A comprehensive simulation study has been done to evaluate the performance of the proposed algorithms in terms of their solution quality and efficiency. The simulation results show that AGA outperforms the greedy algorithm and non-adaptive genetic algorithm in terms of solution quality.

  6. The scheduling of tracking times for interplanetary spacecraft on the Deep Space Network

    Science.gov (United States)

    Webb, W. A.

    1978-01-01

    The Deep Space Network (DSN) is a network of tracking stations, located throughout the globe, used to track spacecraft for NASA's interplanetary missions. This paper describes a computer program, DSNTRAK, which provides an optimum daily tracking schedule for the DSN given the view periods at each station for a mission set of n spacecraft, where n is between 2 and 6. The objective function is specified in terms of relative total daily tracking time requirements between the n spacecraft. Linear programming is used to maximize the total daily tracking time and determine an optimal daily tracking schedule consistent with DSN station capabilities. DSNTRAK is used as part of a procedure to provide DSN load forecasting information for proposed future NASA mission sets.

  7. Creation and clinical application of real-time dose monitor using dose area product meter

    International Nuclear Information System (INIS)

    Matsubara, Kosuke; Uoyama, Yoshinori; Iida, Hiroji; Mizushima, Takashi

    2004-01-01

    The management of patient dose has become more of an issue in recent years. Dose can be determined non-invasively and in real time through the use of a dose area product meter, but it is the area dose value that is obtained. Therefore, we created a program that estimates entrance skin dose (ESD) in real time from area dose values obtained during procedures. We used Microsoft Visual C++ 6.0 (Standard Edition) for the programming language and C language for the programming environment. The value was a maximum 285.4 mGy at ileus tube insertion when measuring ESD for radiography of the digestive organ and non-vascular type interventional radiology (IVR) using the created program and seeking the average according to the procedures. The program that we created can be considered valid for monitoring ESD correctly and in real time. (author)

  8. Real-time energy resources scheduling considering short-term and very short-term wind forecast

    Energy Technology Data Exchange (ETDEWEB)

    Silva, Marco; Sousa, Tiago; Morais, Hugo; Vale, Zita [Polytechnic of Porto (Portugal). GECAD - Knowledge Engineering and Decision Support Research Center

    2012-07-01

    This paper proposes an energy resources management methodology based on three distinct time horizons: day-ahead scheduling, hour-ahead scheduling, and real-time scheduling. In each scheduling process the update of generation and consumption operation and of the storage and electric vehicles storage status are used. Besides the new operation conditions, the most accurate forecast values of wind generation and of consumption using results of short-term and very short-term methods are used. A case study considering a distribution network with intensive use of distributed generation and electric vehicles is presented. (orig.)

  9. MULTISHAPE TASK SCHEDULING ALGORITHM FOR REAL TIME MICRO-CONTROLLER BASED APPLICATION

    OpenAIRE

    Ankur Jain

    2017-01-01

    Embedded Systems are usually microcontroller-based systems that represent a class of reliable and dependable dedicated computer systems designed for specific purposes. Micro-controllers are used in most electronic devices in an endless variety of ways. Some micro-controller-based embedded systems are required to respond to external events in the shortest possible time and such systems are known as realtime embedded systems. So in multitasking system there is a need of task Scheduling, there a...

  10. Heuristics methods for the flow shop scheduling problem with separated setup times

    Directory of Open Access Journals (Sweden)

    Marcelo Seido Nagano

    2012-06-01

    Full Text Available This paper deals with the permutation flow shop scheduling problem with separated machine setup times. As a result of an investigation on the problem characteristics, four heuristics methods are proposed with procedures of the construction sequencing solution by an analogy with the asymmetric traveling salesman problem with the objective of minimizing makespan. Experimental results show that one of the new heuristics methods proposed provide high quality solutions in comparisons with the evaluated methods considered in the literature.

  11. Time and Energy Efficient DVS Scheduling for Real-Time Pinwheel Tasks

    OpenAIRE

    Da-Ren, Chen; Young-Long, Chen; You-Shyang, Chen

    2014-01-01

    Dynamic voltage/frequency scaling (DVFS) is one of the most effective techniques for reducing energy use. In this paper, we focus on the pinwheel task model to develop a variable voltage processor with d discrete voltage/speed levels. Depending on the granularity of execution unit to which voltage scaling is applied, DVFS scheduling can be defined in two categories: (i) inter-task DVFS and (ii) intra-task DVFS. In the periodic pinwheel task model, we modified the definitions of both intra- an...

  12. Crew Scheduling Considering both Crew Duty Time Difference and Cost on Urban Rail System

    Directory of Open Access Journals (Sweden)

    Wenliang Zhou

    2016-11-01

    Full Text Available Urban rail crew scheduling problem is to allocate train services to crews based on a given train timetable while satisfying all the operational and contractual requirements. In this paper, we present a new mathematical programming model with the aim of minimizing both the related costs of crew duty and the variance of duty time spreads. In addition to iincorporating the commonly encountered crew scheduling constraints, it also takes into consideration the constraint of arranging crews having a meal in the specific meal period of one day rather than after a minimum continual service time. The proposed model is solved by an ant colony algorithm which is built based on the construction of ant travel network and the design of ant travel path choosing strategy. The performances of the model and the algorithm are evaluated by conducting case study on Changsha urban rail. The results indicate that the proposed method can obtain a satisfactory crew schedule for urban rails with a relatively small computational time.

  13. Low-dose X-irradiation of adjuvant-induced arthritis in rats. Efficacy of different fractionation schedules

    International Nuclear Information System (INIS)

    Liebmann, A.; Hindemith, M.; Jahns, J.; Kamprad, F.; Hildebrandt, G.; Madaj-Sterba, P.; Weisheit, S.

    2004-01-01

    Background and purpose: low-dose radiotherapy is widely accepted as a very effective treatment option for inflammatory symptoms associated with painful degenerative joint disorders. Radiation doses and fractionation schedules in practical use are empirical and mainly based on clinical observations. Experimental data are rare. The efficacy of low-dose X-irradiation on adjuvant induced arthritis in rats using different fractionation schemes was investigated in vivo, in order to explore whether there is a dose and fractionation dependence. Material and methods: adjuvant arthritis in female lewis rats (n = 128) was induced by intradermal injection of heat-inactivated Mycobacterium tuberculosis on day 0. Both arthritic hind paws were sham-irradiated (group 1: days 10-14; group 2: days 15-19; group 3: days 22-26) or X-irradiated with either 5 x 1.0 Gy (group 4: days 10-14; group 6: days 15-19; group 8: days 22-26; group 10: days 10, 12, 14, 16, and 18) or 5 x 0.5 Gy (group 5: days 10-14; group 7: days 15-19; group 9: days 22-26; group 11: days 10, 12, 14, 16, and 18; group 12: days 10-14 and 22-26). The clinical parameters arthritis score (AS), hind paw volume (HPV), and body weight were determined. Results: a significant decrease of the clinical arthritis parameters was observed following 5 x 0.5 Gy or 5 x 1.0 Gy during the acute maximum of the inflammatory response (days 15-19). The most pronounced treatment effect was reached after two daily fractionated series of 5 x 0.5 Gy with an early treatment onset (days 10-14) and repetition in interval (days 22-26). After the application of 5 x 1.0 Gy on days 10-14 or in a protracted scheme (days 10, 12, 14, 16, and 18), only a nonsignificant positive trend could be detected. Daily fractionated X-irradiation in the chronic phase of adjuvant arthritis (days 22-26) did not show any positive clinical effect. Conclusion: low-dose radiotherapy is able to prevent a full-blown arthritic reaction if given during the florid phase of

  14. Assessment of mumps-containing vaccine effectiveness during an outbreak: Importance to introduce the 2-dose schedule for China.

    Science.gov (United States)

    Ma, Chao; Liu, Yan; Tang, Jihai; Jia, Haimei; Qin, Wei; Su, Ying; Wang, Huaqing; Hao, Lixin

    2018-01-29

    China has used 3 different mumps-containing vaccines (MuCV) since 1990: monovalent mumps vaccine, measles-mumps (MM) vaccine, and measles-mumps-rubella (MMR) vaccine, and one dose MuCV (using MMR at 18 months) has been included in the EPI since 2007. MuCV effectiveness has been of concern following large-scale mumps outbreaks. In 2015, an outbreak of mumps occurred in a primary school, which allow us assess vaccine effectiveness of different MuCVs. All children in the school were studied as a retrospective cohort. Vaccination histories and case information were obtained from vaccination records and clinic/hospital logs. Parental questionnaires were used to confirm students' illnesses and calculate attack rate (AR). VE was assessed using the formula, VE = (AR in unvaccinated students- AR in the vaccinated students) / (AR in unvaccinated students). VEs of different type of MuCV were compared. In total, 283 students were identified as clinical mumps among the 2370 students, and 1908 students were included for MuCV VE assessment. 213 (including 21 [8.9%] patients) were 2-dose MuCV recipients (AR: 9.9%), 1165 (including 123 [51.9%] patients) were 1-dose recipients (AR: 10.6%), and 530 (including 93 [39.2%] patients) were unvaccinated (AR: 17.5%). VE was 44% for 2 doses and 40% for one dose. For one-MuCV-dose students, estimated mumps VE was 63% for vaccinated within 3 years (between vaccination and this outbreak); 50% for vaccinated within 3 to 5 years; and 34% for vaccinated more than 5 years. Comparing VE by vaccine type and 5-year interval since vaccination, VE for MMR was 60%, which was consistently higher than VE for monovalent mumps vaccine (22%) and MM (2%). This outbreak was associated with low and declining 1-dose MuCV effectiveness. China's immunization program should evaluate the potential of a 2-dose MMR schedule to adequately control mumps.

  15. Effective Iterated Greedy Algorithm for Flow-Shop Scheduling Problems with Time lags

    Science.gov (United States)

    ZHAO, Ning; YE, Song; LI, Kaidian; CHEN, Siyu

    2017-05-01

    Flow shop scheduling problem with time lags is a practical scheduling problem and attracts many studies. Permutation problem(PFSP with time lags) is concentrated but non-permutation problem(non-PFSP with time lags) seems to be neglected. With the aim to minimize the makespan and satisfy time lag constraints, efficient algorithms corresponding to PFSP and non-PFSP problems are proposed, which consist of iterated greedy algorithm for permutation(IGTLP) and iterated greedy algorithm for non-permutation (IGTLNP). The proposed algorithms are verified using well-known simple and complex instances of permutation and non-permutation problems with various time lag ranges. The permutation results indicate that the proposed IGTLP can reach near optimal solution within nearly 11% computational time of traditional GA approach. The non-permutation results indicate that the proposed IG can reach nearly same solution within less than 1% computational time compared with traditional GA approach. The proposed research combines PFSP and non-PFSP together with minimal and maximal time lag consideration, which provides an interesting viewpoint for industrial implementation.

  16. Investigating the Effect of Voltage-Switching on Low-Energy Task Scheduling in Hard Real-Time Systems

    Science.gov (United States)

    2005-01-01

    We investigate the effect of voltage-switching on task execution times and energy consumption for dual-speed hard real - time systems , and present a...scheduling algorithm and apply it to two real-life task sets. Our results show that energy can be conserved in embedded real - time systems using energy...aware task scheduling. We also show that switching times have a significant effect on the energy consumed in hard real - time systems .

  17. An Artificial Bee Colony Algorithm for the Job Shop Scheduling Problem with Random Processing Times

    Directory of Open Access Journals (Sweden)

    Rui Zhang

    2011-09-01

    Full Text Available Due to the influence of unpredictable random events, the processing time of each operation should be treated as random variables if we aim at a robust production schedule. However, compared with the extensive research on the deterministic model, the stochastic job shop scheduling problem (SJSSP has not received sufficient attention. In this paper, we propose an artificial bee colony (ABC algorithm for SJSSP with the objective of minimizing the maximum lateness (which is an index of service quality. First, we propose a performance estimate for preliminary screening of the candidate solutions. Then, the K-armed bandit model is utilized for reducing the computational burden in the exact evaluation (through Monte Carlo simulation process. Finally, the computational results on different-scale test problems validate the effectiveness and efficiency of the proposed approach.

  18. Effect of reduced dose schedules and intramuscular injection of anthrax vaccine adsorbed on immunological response and safety profile: a randomized trial.

    Science.gov (United States)

    Wright, Jennifer G; Plikaytis, Brian D; Rose, Charles E; Parker, Scott D; Babcock, Janiine; Keitel, Wendy; El Sahly, Hana; Poland, Gregory A; Jacobson, Robert M; Keyserling, Harry L; Semenova, Vera A; Li, Han; Schiffer, Jarad; Dababneh, Hanan; Martin, Sandra K; Martin, Stacey W; Marano, Nina; Messonnier, Nancy E; Quinn, Conrad P

    2014-02-12

    We evaluated an alternative administration route, reduced schedule priming series, and increased intervals between booster doses for anthrax vaccine adsorbed (AVA). AVA's originally licensed schedule was 6 subcutaneous (SQ) priming injections administered at months (m) 0, 0.5, 1, 6, 12 and 18 with annual boosters; a simpler schedule is desired. Through a multicenter randomized, double blind, non-inferiority Phase IV human clinical trial, the originally licensed schedule was compared to four alternative and two placebo schedules. 8-SQ group participants received 6 SQ injections with m30 and m42 "annual" boosters; participants in the 8-IM group received intramuscular (IM) injections according to the same schedule. Reduced schedule groups (7-IM, 5-IM, 4-IM) received IM injections at m0, m1, m6; at least one of the m0.5, m12, m18, m30 vaccine doses were replaced with saline. All reduced schedule groups received a m42 booster. Post-injection blood draws were taken two to four weeks following injection. Non-inferiority of the alternative schedules was compared to the 8-SQ group at m2, m7, and m43. Reactogenicity outcomes were proportions of injection site and systemic adverse events (AEs). The 8-IM group's m2 response was non-inferior to the 8-SQ group for the three primary endpoints of anti-protective antigen IgG geometric mean concentration (GMC), geometric mean titer, and proportion of responders with a 4-fold rise in titer. At m7 anti-PA IgG GMCs for the three reduced dosage groups were non-inferior to the 8-SQ group GMCs. At m43, 8-IM, 5-IM, and 4-IM group GMCs were superior to the 8-SQ group. Solicited injection site AEs occurred at lower proportions in the IM group compared to SQ. Route of administration did not influence the occurrence of systemic AEs. A 3 dose IM priming schedule with doses administered at m0, m1, and m6 elicited long term immunological responses and robust immunological memory that was efficiently stimulated by a single booster vaccination at

  19. Committed effective doses at various times after intakes of radionuclides

    CERN Document Server

    Phipps, A W; Kendall, G M; Silk, T J; Stather, J W

    1991-01-01

    This report contains details of committed effective doses at nine times after intake from intakes by ingestion and inhalation of 1 mu 1 AMAD particles by adults. Data are given for various chemical forms of 359 nuclides. It complements NRPB-R245 which describes the changes which have taken place since the last NRPB compendium of dose per unit intake factors (dose coefficients) and gives summary tables. Information on committed equivalent doses to organs is given in NRPB-M288. The information given in these memoranda is also available as a microcomputer package - NRPB-SR245.

  20. Investigating the Effect of Voltage-Switching on Low-Energy Task Scheduling in Hard Real-Time Systems

    National Research Council Canada - National Science Library

    Swaminathan, Vishnu; Chakrabarty, Krishnendu

    2005-01-01

    We investigate the effect of voltage-switching on task execution times and energy consumption for dual-speed hard real-time systems, and present a new approach for scheduling workloads containing periodic tasks...

  1. An Optimal Scheduling Algorithm with a Competitive Factor for Real-Time Systems

    Science.gov (United States)

    1991-07-29

    real - time systems in which the value of a task is proportional to its computation time. The system obtains the value of a given task if the task completes by its deadline. Otherwise, the system obtains no value for the task. When such a system is underloaded (i.e. there exists a schedule for which all tasks meet their deadlines), Dertouzos [6] showed that the earliest deadline first algorithm will achieve 100% of the possible value. We consider the case of a possibly overloaded system and present an algorithm which: 1. behaves like the earliest deadline first

  2. Real-Time Robust Adaptive Modeling and Scheduling for an Electronic Commerce Server

    Science.gov (United States)

    Du, Bing; Ruan, Chun

    With the increasing importance and pervasiveness of Internet services, it is becoming a challenge for the proliferation of electronic commerce services to provide performance guarantees under extreme overload. This paper describes a real-time optimization modeling and scheduling approach for performance guarantee of electronic commerce servers. We show that an electronic commerce server may be simulated as a multi-tank system. A robust adaptive server model is subject to unknown additive load disturbances and uncertain model matching. Overload control techniques are based on adaptive admission control to achieve timing guarantees. We evaluate the performance of the model using a complex simulation that is subjected to varying model parameters and massive overload.

  3. Effect of time, dose and fractionation on local control of nasopharyngeal carcinoma

    International Nuclear Information System (INIS)

    Lee, Anne W.M.; Chan, David K.K.; Poon, Y.F.; Foo, William; Law, Stephen C.K.; O, S.K.; Tung, Stewart Y.; Fowler, Jack F.; Chappell, Rick

    1995-01-01

    To study the effect of radiation factors on local control of nasopharyngeal carcinoma, 1008 patients with similarly staged T1N0-3M0 disease (Ho's classification) were retrospectively analyzed. All patients were treated by megavoltage irradiation alone using the same technique. Four different fractionation schedules had been used sequentially during 1976-1985: with total dose ranging from 45.6 to 60 Gy and fractional dose from 2.5 to 4.2 Gy. The median overall time was 39 days (range = 38-75 days). Both for the whole series and 763 patients with nodal control, total dose was the most important radiation factor. The hazard of local failure decreased by 9% per additional Gy (p < 0.01). Biological equivalents expressed in terms of Biologically Effective Dose or Nominal Standard Dose also showed strong correlation. Fractional dose had no significant impact. The effect of overall treatment time was insignificant for the whole series, but almost reached statistical significance for those with nodal control (p = 0.06). Further study is required for elucidation, as 85% of patients completed treatment within a very narrow range (38-42 days), and the possible hazard is clinically too significant to be ignored

  4. Real-time personal dose measurement and management system

    International Nuclear Information System (INIS)

    Zhang Zhiyong; Cheng Chang; Liu Zhengshan; Yang Huating; Deng Changming; Zhang Xiu; Guo Zhanjie

    2001-01-01

    The composition and design of a real-time personal dose measurement and management system are described. Accordingly, some pertinent hardware circuits and software codes including their operation modes are presented

  5. Robust Parallel Machine Scheduling Problem with Uncertainties and Sequence-Dependent Setup Time

    Directory of Open Access Journals (Sweden)

    Hongtao Hu

    2016-01-01

    Full Text Available A parallel machine scheduling problem in plastic production is studied in this paper. In this problem, the processing time and arrival time are uncertain but lie in their respective intervals. In addition, each job must be processed together with a mold while jobs which belong to one family can share the same mold. Therefore, time changing mold is required for two consecutive jobs that belong to different families, which is known as sequence-dependent setup time. This paper aims to identify a robust schedule by min–max regret criterion. It is proved that the scenario incurring maximal regret for each feasible solution lies in finite extreme scenarios. A mixed integer linear programming formulation and an exact algorithm are proposed to solve the problem. Moreover, a modified artificial bee colony algorithm is developed to solve large-scale problems. The performance of the presented algorithm is evaluated through extensive computational experiments and the results show that the proposed algorithm surpasses the exact method in terms of objective value and computational time.

  6. Outcomes Associated With 3 Treatment Schedules of High-Dose-Rate Brachytherapy Monotherapy for Favorable-Risk Prostate Cancer

    Energy Technology Data Exchange (ETDEWEB)

    Jawad, Maha Saada; Dilworth, Joshua T.; Gustafson, Gary S.; Ye, Hong; Wallace, Michelle [Department of Radiation Oncology, Oakland University William Beaumont School of Medicine, Royal Oak, Michigan (United States); Martinez, Alvaro [Michigan HealthCare Professionals/21" s" t Century Oncology, Farmington Hills, Michigan (United States); Chen, Peter Y. [Department of Radiation Oncology, Oakland University William Beaumont School of Medicine, Royal Oak, Michigan (United States); Krauss, Daniel J., E-mail: DKrauss@beaumont.edu [Department of Radiation Oncology, Oakland University William Beaumont School of Medicine, Royal Oak, Michigan (United States)

    2016-03-15

    Purpose: We report the outcomes associated with 3 high-dose-rate (HDR) brachytherapy regimens used as monotherapy for favorable-risk prostate cancer. Methods and Materials: Four hundred ninety-four patients with stage ≤T2b prostate cancer, Gleason score ≤7, and prostate-specific antigen levels ≤15 ng/mL underwent HDR brachytherapy as monotherapy. Of those, 319 received 38 Gy in 4 fractions, 79 received 24 Gy in 2 fractions, and 96 received 27 Gy in 2 fractions. Acute and chronic genitourinary (GU) and gastrointestinal (GI) toxicities were defined as side effects occurring ≤6 and >6 months, respectively, after radiation therapy (RT) and were graded according to the Common Terminology Criteria for Adverse Events version 3.0. The time to toxicity was calculated from the date of RT completion. Variables were analyzed with χ{sup 2} test. P values <.05 were considered significant. Results: The median overall follow-up time was 4 years (range, 5.5, 3.5, and 2.5 years for 38 Gy, 24 Gy, and 27 Gy, respectively, P<.001). Acute and chronic grade ≥2 GU and GI toxicity profiles were similar among groups. Acceptable rates of grade 2 GU toxicities were seen with overall acute/chronic frequency/urgency, dysuria, retention, incontinence, and hematuria rates of 14%/20%, 6%/7%, 7%/4%, 1.5%/2%, and 1.5%/7%, respectively. Minimal grade 3 and no grade 4 or 5 toxicities were seen. Grade 1, 2, and 3 chronic urethral stricture rates were 0.3%, 2%, and 1%, respectively. All GI toxicities were similar between groups, with overall rates of acute/chronic grade 2 diarrhea, rectal pain/tenesmus, rectal bleeding, and proctitis of 1%/1%, <1%/0.5%, 0%/2%, and <1%/1%, respectively. No grade 3, 4, or 5 toxicities were seen. All comparisons were similar for hormone-naïve patients. The median time to maximal GU/GI toxicity was similar between groups, ranging from 1 to 1.6 to 0.9 to 1.2 years, respectively. There were no differences in clinical outcomes between the 3 groups at 5

  7. Anti-CD20 Cell Therapies in Multiple Sclerosis—A Fixed Dosing Schedule for Ocrelizumab is Overkill

    Directory of Open Access Journals (Sweden)

    Jagannadha Avasarala

    2017-10-01

    Full Text Available Anti-CD 20 therapies have found significant uses in multiple sclerosis (MS. Based singularly on the accumulated evidence with the use of rituximab (RTX; Rituxan, Genentech, and Biogen in neuroimmunological diseases, ocrelizumab (OCR; Ocrevus, Genentech was developed as a treatment option for MS and selectively targets CD20 B cells, a cell surface antigen found on pre-B cells, mature, and memory B cells, but not on lymphoid stem cells and plasma cells. On the basis of indirect evidence, elimination of the antigen-presenting capabilities and antigen nonspecific immune functions of B cells appear to be central to the therapeutic efficacy of anti-CD20 B-cell therapies. An important question is this—Why does the drug need to be dosed at fixed intervals and not based on a measurable endpoint, such as tracking peripheral CD20 cell counts? There is minimal scientific validity in infusing the drug every 6 months particularly if CD20 cell counts are negligible in the peripheral blood. In this analysis, a case is made for following CD19 cell populations as a surrogate for CD20 cells on a monthly basis to guide OCR redosing parameters and does not follow a scheduled dosing parameter.

  8. A Work-Demand Analysis Compatible with Preemption-Aware Scheduling for Power-Aware Real-Time Tasks

    Directory of Open Access Journals (Sweden)

    Da-Ren Chen

    2013-01-01

    Full Text Available Due to the importance of slack time utilization for power-aware scheduling algorithms,we propose a work-demand analysis method called parareclamation algorithm (PRA to increase slack time utilization of the existing real-time DVS algorithms. PRA is an online scheduling for power-aware real-time tasks under rate-monotonic (RM policy. It can be implemented and fully compatible with preemption-aware or transition-aware scheduling algorithms without increasing their computational complexities. The key technique of the heuristics method doubles the analytical interval and turns the deferrable workload out the potential slack time. Theoretical proofs show that PRA guarantees the task deadlines in a feasible RM schedule and takes linear time and space complexities. Experimental results indicate that the proposed method combining the preemption-aware methods seamlessly reduces the energy consumption by 14% on average over their original algorithms.

  9. Single Machine Scheduling and Due Date Assignment with Past-Sequence-Dependent Setup Time and Position-Dependent Processing Time

    Directory of Open Access Journals (Sweden)

    Chuan-Li Zhao

    2014-01-01

    Full Text Available This paper considers single machine scheduling and due date assignment with setup time. The setup time is proportional to the length of the already processed jobs; that is, the setup time is past-sequence-dependent (p-s-d. It is assumed that a job's processing time depends on its position in a sequence. The objective functions include total earliness, the weighted number of tardy jobs, and the cost of due date assignment. We analyze these problems with two different due date assignment methods. We first consider the model with job-dependent position effects. For each case, by converting the problem to a series of assignment problems, we proved that the problems can be solved in On4 time. For the model with job-independent position effects, we proved that the problems can be solved in On3 time by providing a dynamic programming algorithm.

  10. Preemptive and Non-Preemptive Real-Time UniProcessor Scheduling

    OpenAIRE

    George , Laurent; Rivierre , Nicolas; Spuri , Marco

    1996-01-01

    Projet REFLECS; Scheduling theory, as it applies to hard-real-time environment, has been widely studied in the last twenty years and it might be unclear to make it out within the plethora of results available. Our goal is first to collect in a single paper the results known for uniproces sor, non-idling, preemptive/non-preemptive, fixed/dynamic priority driven contexts, consid ering general task sets as a central figure for the description of possible processor loads. Second to establish new ...

  11. Schedule evolution during the life-time of the LHC project

    CERN Document Server

    Foraz, K; Gaillard, H; Hauviller, Claude; Weisz, S

    2007-01-01

    The Large Hadron Collider Project was approved by the CERN Council in December 1994. The CERN management opted from the beginning of the project for a very aggressive installation planning based on a just-in-time sequencing of all activities. This paper aims to draw how different factors (technical development, procurement, logistics and organization) have impacted on the schedule evolution through the lifetime of the project. It describes the cause effect analysis of the major rescheduling that occurred during the installation of the LHC and presents some general conclusions potentially applicable in other projects.

  12. New scheduling rules for a dynamic flexible flow line problem with sequence-dependent setup times

    Science.gov (United States)

    Kia, Hamidreza; Ghodsypour, Seyed Hassan; Davoudpour, Hamid

    2017-09-01

    In the literature, the application of multi-objective dynamic scheduling problem and simple priority rules are widely studied. Although these rules are not efficient enough due to simplicity and lack of general insight, composite dispatching rules have a very suitable performance because they result from experiments. In this paper, a dynamic flexible flow line problem with sequence-dependent setup times is studied. The objective of the problem is minimization of mean flow time and mean tardiness. A 0-1 mixed integer model of the problem is formulated. Since the problem is NP-hard, four new composite dispatching rules are proposed to solve it by applying genetic programming framework and choosing proper operators. Furthermore, a discrete-event simulation model is made to examine the performances of scheduling rules considering four new heuristic rules and the six adapted heuristic rules from the literature. It is clear from the experimental results that composite dispatching rules that are formed from genetic programming have a better performance in minimization of mean flow time and mean tardiness than others.

  13. An Efficient Randomized Algorithm for Real-Time Process Scheduling in PicOS Operating System

    Science.gov (United States)

    Helmy*, Tarek; Fatai, Anifowose; Sallam, El-Sayed

    PicOS is an event-driven operating environment designed for use with embedded networked sensors. More specifically, it is designed to support the concurrency in intensive operations required by networked sensors with minimal hardware requirements. Existing process scheduling algorithms of PicOS; a commercial tiny, low-footprint, real-time operating system; have their associated drawbacks. An efficient, alternative algorithm, based on a randomized selection policy, has been proposed, demonstrated, confirmed for efficiency and fairness, on the average, and has been recommended for implementation in PicOS. Simulations were carried out and performance measures such as Average Waiting Time (AWT) and Average Turn-around Time (ATT) were used to assess the efficiency of the proposed randomized version over the existing ones. The results prove that Randomized algorithm is the best and most attractive for implementation in PicOS, since it is most fair and has the least AWT and ATT on average over the other non-preemptive scheduling algorithms implemented in this paper.

  14. Negotiating on location, timing, duration, and participant in agent-mediated joint activity-travel scheduling

    Science.gov (United States)

    Ma, Huiye; Ronald, Nicole; Arentze, Theo A.; Timmermans, Harry J. P.

    2013-10-01

    Agent-based simulation has become an important modeling approach in activity-travel analysis. Social activities account for a large amount of travel and have an important effect on activity-travel scheduling. Participants in joint activities usually have various options regarding location, participants, and timing and take different approaches to make their decisions. In this context, joint activity participation requires negotiation among agents involved, so that conflicts among the agents can be addressed. Existing mechanisms do not fully provide a solution when utility functions of agents are nonlinear and non-monotonic. Considering activity-travel scheduling in time and space as an application, we propose a novel negotiation approach, which takes into account these properties, such as continuous and discrete issues, and nonlinear and non-monotonic utility functions, by defining a concession strategy and a search mechanism. The results of experiments show that agents having these properties can negotiate efficiently. Furthermore, the negotiation procedure affects individuals’ choices of location, timing, duration, and participants.

  15. Broadcast Scheduling Strategy Based on the Priority of Real- Time Data in a Mobile Environment

    Institute of Scientific and Technical Information of China (English)

    Yang Jin-cai; Liu Yun-sheng

    2003-01-01

    Data broadcast is an important data dissemina-tion approach in mobile environment. On broadcast channel,scalability and efficiency of data transmission are satisfied. In a mobile environment, there exists a kind of real-time data-base application in which both the transactions and data can have their timing constraints and priorities of different levels.In order to meet the requirement of real-time data dissemina-ting and retrieving, a broadcast scheduling strategy HPF-ED F(Highest Priority First with Earlier Deadline and Frequen-cy) is proposed under the BoD (Broadcast on Demand) mod-el. Using the strategy, data items are scheduled according to their priority the transaction imposed on them or system set for them. The strategy also considers other characteristics ofdata items such as deadline and popularity of data. The exten-sive simulation experiments have been conducted to evaluate the performance of the proposed algorithm. Results show that it can achieve excellent performance compared with existing strategies.

  16. Real-Time Forecasting of EV Charging Station Scheduling for Smart Energy Systems

    Directory of Open Access Journals (Sweden)

    Bharatiraja Chokkalingam

    2017-03-01

    Full Text Available The enormous growth in the penetration of electric vehicles (EVs, has laid the path to advancements in the charging infrastructure. Connectivity between charging stations is an essential prerequisite for future EV adoption to alleviate user’s “range anxiety”. The existing charging stations fail to adopt power provision, allocation and scheduling management. To improve the existing charging infrastructure, data based on real-time information and availability of reserves at charging stations could be uploaded to the users to help them locate the nearest charging station for an EV. This research article focuses on an a interactive user application developed through SQL and PHP platform to allocate the charging slots based on estimated battery parameters, which uses data communication with charging stations to receive the slot availability information. The proposed server-based real-time forecast charging infrastructure avoids waiting times and its scheduling management efficiently prevents the EV from halting on the road due to battery drain out. The proposed model is implemented using a low-cost microcontroller and the system etiquette tested.

  17. Postoperative irradiation for the prevention of heterotopic bone: Analysis of different dose schedules and shielding considerations

    International Nuclear Information System (INIS)

    Blount, L.H.; Thomas, B.J.; Tran, L.; Selch, M.T.; Sylvester, J.E.; Parker, R.G.

    1990-01-01

    Ninety-seven high risk hips were irradiated postoperatively for prevention of heterotopic bone (HTB) in the UCLA Department of Radiation Oncology from 1980 to 1988. Ninety-two hips in 82 patients were eligible for analysis with a minimum follow-up of 2 months and a median follow-up of 10 months. Forty-nine of the hips had porous coated ingrowth prostheses. From 1980 to 1986, 2 Gy fractions were used to deliver 20 Gy (8 hips), 12 Gy (1 hip), and 10 Gy (27 hips). Since December of 1986, 38 hips received 8 Gy in two increments and 18 hips received a single 7 Gy fraction. All porous ingrowth components were shielded with custom blocks. Six out of 92 hips developed clinically significant. There was one clinically significant failure in 78 hips (1.3%) when irradiation was initiated before post-operative day (POD) No.6 and shielding was properly placed. One clinical failure occurred in 38 hips which received 8 Gy in two increments. One clinical failure occurred out of the 18 hips treated with 7 Gy in one fraction. This failure could be related to block malposition. There were four clinical failures in the 36 hips treated with 2 Gy fractions to total doses of 10 Gy, 12 Gy, or 20 Gy. Three of these failures were associated with initiation of treatment after POD No.5, and the fourth was related to block malposition. Unshielded trochanteric osteotomies resulted in five migrations and seven fibrous unions for a total non-osseous union rate of 12/36 (33%). Shielding of the remaining 28 trochanteric osteotomies resulted in a non-osseous union rate of 7%. There were no failures of union of components, and the only side effects noted in the series were the five trochanteric migrations. In conclusion, the use of 8 Gy in two increments or 7 Gy in one fraction was found to be as efficacious as conventional 2 Gy fractionation schemes with no increase in side effects

  18. Dose dependency of time of onset of radiation-induced growth hormone deficiency

    International Nuclear Information System (INIS)

    Clayton, P.E.; Shalet, S.M.

    1991-01-01

    Growth hormone (GH) secretion during insulin-induced hypoglycemia was assessed on 133 occasions in 82 survivors of childhood malignant disease. All had received cranial irradiation with a dose range to the hypothalamic-pituitary axis of 27 to 47.5 Gy (estimated by a schedule of 16 fractions over 3 weeks) and had been tested on one or more occasions between 0.2 and 18.9 years after treatment. Results of one third of the GH tests were defined as normal (GH peak response, greater than 15 mU/L) within the first 5 years, in comparison with 16% after 5 years. Stepwise multiple linear regression analysis showed that dose (p = 0.007) and time from irradiation (p = 0.03), but not age at therapy, had a significant influence on peak GH responses. The late incidence of GH deficiency was similar over the whole dose range (4 of 26 GH test results normal for less than 30 Gy and 4 of 25 normal for greater than or equal to 30 Gy after 5 years), but the speed of onset over the first years was dependent on dose. We conclude that the requirement for GH replacement therapy and the timing of its introduction will be influenced by the dose of irradiation received by the hypothalamic-pituitary axis

  19. Reducing dose calculation time for accurate iterative IMRT planning

    International Nuclear Information System (INIS)

    Siebers, Jeffrey V.; Lauterbach, Marc; Tong, Shidong; Wu Qiuwen; Mohan, Radhe

    2002-01-01

    A time-consuming component of IMRT optimization is the dose computation required in each iteration for the evaluation of the objective function. Accurate superposition/convolution (SC) and Monte Carlo (MC) dose calculations are currently considered too time-consuming for iterative IMRT dose calculation. Thus, fast, but less accurate algorithms such as pencil beam (PB) algorithms are typically used in most current IMRT systems. This paper describes two hybrid methods that utilize the speed of fast PB algorithms yet achieve the accuracy of optimizing based upon SC algorithms via the application of dose correction matrices. In one method, the ratio method, an infrequently computed voxel-by-voxel dose ratio matrix (R=D SC /D PB ) is applied for each beam to the dose distributions calculated with the PB method during the optimization. That is, D PB xR is used for the dose calculation during the optimization. The optimization proceeds until both the IMRT beam intensities and the dose correction ratio matrix converge. In the second method, the correction method, a periodically computed voxel-by-voxel correction matrix for each beam, defined to be the difference between the SC and PB dose computations, is used to correct PB dose distributions. To validate the methods, IMRT treatment plans developed with the hybrid methods are compared with those obtained when the SC algorithm is used for all optimization iterations and with those obtained when PB-based optimization is followed by SC-based optimization. In the 12 patient cases studied, no clinically significant differences exist in the final treatment plans developed with each of the dose computation methodologies. However, the number of time-consuming SC iterations is reduced from 6-32 for pure SC optimization to four or less for the ratio matrix method and five or less for the correction method. Because the PB algorithm is faster at computing dose, this reduces the inverse planning optimization time for our implementation

  20. CP Methods for Scheduling and Routing with Time-Dependent Task Costs

    DEFF Research Database (Denmark)

    Tierney, Kevin; Kelareva, Elena; Kilby, Philip

    2013-01-01

    a cost function, and Mixed Integer Programming (MIP) are often used for solving such problems. However, Constraint Programming (CP), particularly with Lazy Clause Genera- tion (LCG), has been found to be faster than MIP for some scheduling problems with time-varying action costs. In this paper, we...... compare CP and LCG against a solve-and-improve approach for two recently introduced problems in maritime logistics with time-varying action costs: the Liner Shipping Fleet Repositioning Problem (LSFRP) and the Bulk Port Cargo Throughput Optimisation Problem (BPCTOP). We present a novel CP model...... for the LSFRP, which is faster than all previous methods and outperforms a simplified automated planning model without time-varying costs. We show that a LCG solver is faster for solving the BPCTOP than a standard finite domain CP solver with a simplified model. We find that CP and LCG are effective methods...

  1. Sleep-time sizing and scheduling in green passive optical networks

    KAUST Repository

    Elrasad, Amr

    2012-08-01

    Next-generation passive optical network (PON) has been widely considered as a cost-effective broadband access technology. With the ever-increasing power saving concern, energy efficiency has been an important issue for its operations. In this paper, we present a novel sleep time sizing and scheduling framework that satisfies power efficient bandwidth allocation in PONs. We consider the downstream links from an optical line terminal (OLT) to an optical network unit (ONU). The ONU has two classes of traffic, control and data. Control traffic are delay intolerant with higher priority than the data traffic. Closed form model for average ONU sleeping time and end-to-end data traffic delay are presented and evaluated. Our framework decouples the dependency between ONU sleeping time and the QoS of the traffic.

  2. Bi-Objective Flexible Job-Shop Scheduling Problem Considering Energy Consumption under Stochastic Processing Times.

    Science.gov (United States)

    Yang, Xin; Zeng, Zhenxiang; Wang, Ruidong; Sun, Xueshan

    2016-01-01

    This paper presents a novel method on the optimization of bi-objective Flexible Job-shop Scheduling Problem (FJSP) under stochastic processing times. The robust counterpart model and the Non-dominated Sorting Genetic Algorithm II (NSGA-II) are used to solve the bi-objective FJSP with consideration of the completion time and the total energy consumption under stochastic processing times. The case study on GM Corporation verifies that the NSGA-II used in this paper is effective and has advantages to solve the proposed model comparing with HPSO and PSO+SA. The idea and method of the paper can be generalized widely in the manufacturing industry, because it can reduce the energy consumption of the energy-intensive manufacturing enterprise with less investment when the new approach is applied in existing systems.

  3. Batch Scheduling for Hybrid Assembly Differentiation Flow Shop to Minimize Total Actual Flow Time

    Science.gov (United States)

    Maulidya, R.; Suprayogi; Wangsaputra, R.; Halim, A. H.

    2018-03-01

    A hybrid assembly differentiation flow shop is a three-stage flow shop consisting of Machining, Assembly and Differentiation Stages and producing different types of products. In the machining stage, parts are processed in batches on different (unrelated) machines. In the assembly stage, each part of the different parts is assembled into an assembly product. Finally, the assembled products will further be processed into different types of final products in the differentiation stage. In this paper, we develop a batch scheduling model for a hybrid assembly differentiation flow shop to minimize the total actual flow time defined as the total times part spent in the shop floor from the arrival times until its due date. We also proposed a heuristic algorithm for solving the problems. The proposed algorithm is tested using a set of hypothetic data. The solution shows that the algorithm can solve the problems effectively.

  4. Integrated model for pricing, delivery time setting, and scheduling in make-to-order environments

    Science.gov (United States)

    Garmdare, Hamid Sattari; Lotfi, M. M.; Honarvar, Mahboobeh

    2018-03-01

    Usually, in make-to-order environments which work only in response to the customer's orders, manufacturers for maximizing the profits should offer the best price and delivery time for an order considering the existing capacity and the customer's sensitivity to both the factors. In this paper, an integrated approach for pricing, delivery time setting and scheduling of new arrival orders are proposed based on the existing capacity and accepted orders in system. In the problem, the acquired market demands dependent on the price and delivery time of both the manufacturer and its competitors. A mixed-integer non-linear programming model is presented for the problem. After converting to a pure non-linear model, it is validated through a case study. The efficiency of proposed model is confirmed by comparing it to both the literature and the current practice. Finally, sensitivity analysis for the key parameters is carried out.

  5. Energy-Aware Real-Time Task Scheduling for Heterogeneous Multiprocessors with Particle Swarm Optimization Algorithm

    Directory of Open Access Journals (Sweden)

    Weizhe Zhang

    2014-01-01

    Full Text Available Energy consumption in computer systems has become a more and more important issue. High energy consumption has already damaged the environment to some extent, especially in heterogeneous multiprocessors. In this paper, we first formulate and describe the energy-aware real-time task scheduling problem in heterogeneous multiprocessors. Then we propose a particle swarm optimization (PSO based algorithm, which can successfully reduce the energy cost and the time for searching feasible solutions. Experimental results show that the PSO-based energy-aware metaheuristic uses 40%–50% less energy than the GA-based and SFLA-based algorithms and spends 10% less time than the SFLA-based algorithm in finding the solutions. Besides, it can also find 19% more feasible solutions than the SFLA-based algorithm.

  6. Time of day variation in polyp detection rate for colonoscopies performed on a 3-hour shift schedule.

    LENUS (Irish Health Repository)

    Munson, Gregory W

    2011-03-01

    Recent research suggests that the colonoscopy polyp detection rate (PDR) varies by time of day, possibly because of endoscopist fatigue. Mayo Clinic Rochester (MCR) schedules colonoscopies on 3-hour shifts, which should minimize fatigue.

  7. A Statically Scheduled Time-Division-Multiplexed Network-on-Chip for Real-Time Systems

    DEFF Research Database (Denmark)

    Schoeberl, Martin; Brandner, Florian; Sparsø, Jens

    2012-01-01

    This paper explores the design of a circuit-switched network-on-chip (NoC) based on time-division-multiplexing (TDM) for use in hard real-time systems. Previous work has primarily considered application-specific systems. The work presented here targets general-purpose hardware platforms. We...

  8. A hybrid algorithm for flexible job-shop scheduling problem with setup times

    Directory of Open Access Journals (Sweden)

    Ameni Azzouz

    2017-01-01

    Full Text Available Job-shop scheduling problem is one of the most important fields in manufacturing optimization where a set of n jobs must be processed on a set of m specified machines. Each job consists of a specific set of operations, which have to be processed according to a given order. The Flexible Job Shop problem (FJSP is a generalization of the above-mentioned problem, where each operation can be processed by a set of resources and has a processing time depending on the resource used. The FJSP problems cover two difficulties, namely, machine assignment problem and operation sequencing problem. This paper addresses the flexible job-shop scheduling problem with sequence-dependent setup times to minimize two kinds of objectives function: makespan and bi-criteria objective function. For that, we propose a hybrid algorithm based on genetic algorithm (GA and variable neighbourhood search (VNS to solve this problem. To evaluate the performance of our algorithm, we compare our results with other methods existing in literature. All the results show the superiority of our algorithm against the available ones in terms of solution quality.

  9. Variable Neighbourhood Search and Mathematical Programming for Just-in-Time Job-Shop Scheduling Problem

    Directory of Open Access Journals (Sweden)

    Sunxin Wang

    2014-01-01

    Full Text Available This paper presents a combination of variable neighbourhood search and mathematical programming to minimize the sum of earliness and tardiness penalty costs of all operations for just-in-time job-shop scheduling problem (JITJSSP. Unlike classical E/T scheduling problem with each job having its earliness or tardiness penalty cost, each operation in this paper has its earliness and tardiness penalties, which are paid if the operation is completed before or after its due date. Our hybrid algorithm combines (i a variable neighbourhood search procedure to explore the huge feasible solution spaces efficiently by alternating the swap and insertion neighbourhood structures and (ii a mathematical programming model to optimize the completion times of the operations for a given solution in each iteration procedure. Additionally, a threshold accepting mechanism is proposed to diversify the local search of variable neighbourhood search. Computational results on the 72 benchmark instances show that our algorithm can obtain the best known solution for 40 problems, and the best known solutions for 33 problems are updated.

  10. A Metaheuristic Scheduler for Time Division Multiplexed Network-on-Chip

    DEFF Research Database (Denmark)

    Sørensen, Rasmus Bo; Sparsø, Jens; Pedersen, Mark Ruvald

    2014-01-01

    significant practical implications, is the minimization of the TDM schedule period by over-provisioning bandwidth to connections with the smallest bandwidth requirements. Our results show that this is possible with only negligible impact on the schedule period. We evaluate the scheduler with seven different...... applications from the MCSL NOC benchmark suite. In the special case of all-to-all communication with equal bandwidths on all communication channels, we obtain schedules with a shorter period than reported in previous work....

  11. Development of Real-Time Measurement of Effective Dose for High Dose Rate Neutron Fields

    CERN Document Server

    Braby, L A; Reece, W D

    2003-01-01

    Studies of the effects of low doses of ionizing radiation require sources of radiation which are well characterized in terms of the dose and the quality of the radiation. One of the best measures of the quality of neutron irradiation is the dose mean lineal energy. At very low dose rates this can be determined by measuring individual energy deposition events, and calculating the dose mean of the event size. However, at the dose rates that are normally required for biology experiments, the individual events can not be separated by radiation detectors. However, the total energy deposited in a specified time interval can be measured. This total energy has a random variation which depends on the size of the individual events, so the dose mean lineal energy can be calculated from the variance of repeated measurements of the energy deposited in a fixed time. We have developed a specialized charge integration circuit for the measurement of the charge produced in a small ion chamber in typical neutron irradiation exp...

  12. Time improvement of photoelectric effect calculation for absorbed dose estimation

    International Nuclear Information System (INIS)

    Massa, J M; Wainschenker, R S; Doorn, J H; Caselli, E E

    2007-01-01

    Ionizing radiation therapy is a very useful tool in cancer treatment. It is very important to determine absorbed dose in human tissue to accomplish an effective treatment. A mathematical model based on affected areas is the most suitable tool to estimate the absorbed dose. Lately, Monte Carlo based techniques have become the most reliable, but they are time expensive. Absorbed dose calculating programs using different strategies have to choose between estimation quality and calculating time. This paper describes an optimized method for the photoelectron polar angle calculation in photoelectric effect, which is significant to estimate deposited energy in human tissue. In the case studies, time cost reduction nearly reached 86%, meaning that the time needed to do the calculation is approximately 1/7 th of the non optimized approach. This has been done keeping precision invariant

  13. Dose- and time-dependent pharmacokinetics of apigenin trimethyl ether.

    Science.gov (United States)

    Elhennawy, Mai Gamal; Lin, Hai-Shu

    2018-06-15

    Apigenin trimethyl ether (5,7,4'-trimethoxyflavone, ATE), one of the key polymethoxyflavones present in black ginger (rhizome of Kaempferia parviflora) possesses various health-promoting activities. To optimize its medicinal application, the pharmacokinetics of ATE was assessed in Sprague-Dawley rats with emphases to identify the impacts from dose and repeated dosing on its major pharmacokinetic parameters. Plasma ATE levels were monitored by liquid chromatography-tandem mass spectrometry (LC-MS/MS) method. Upon single intravenous administration (2 mg/kg), plasma levels of ATE declined through an apparent first-order process while dose-escalation to 4 and 8 mg/kg led to its non-linear disposition, which could be described by the Michaelis-Menten model. Similarly, dose-dependent oral pharmacokinetics was confirmed and when the dose was escalated from 5 to 15 and 45 mg/kg, much longer mean residence time (MRT 0→last ), higher dose-normalized maximal plasma concentration (C max /Dose) and exposure (AUC/Dose) were observed at 15 and/or 45 mg/kg. One-week daily oral administration of ATE at 15 mg/kg caused its accelerated elimination and the plasma exposure (AUC) after intravenous (2 mg/kg) and oral administration (15 mg/kg) dropped ~40 and 60%, respectively. As ATE displayed both dose- and time-dependent pharmacokinetics, caution is needed in the medicinal applications of ATE and/or black ginger. Copyright © 2018 Elsevier B.V. All rights reserved.

  14. Inactivated polio vaccine: time to introduce it in India's national immunization schedule.

    Science.gov (United States)

    Verma, Ramesh; Khanna, Pardeep; Chawla, Suraj

    2012-07-01

    Polio is a communicable disease caused by poliovirus that may attack nerve cells of the brain and spinal cord. The victims develop neurological complications, likes stiffness of the neck, muscular weakness, or paralysis of one or more limbs. In severe cases, it may be fatal due to respiratory paralysis. The world has seen tremendous gains in polio eradication over the past year. India and Nigeria saw a reduction in cases of almost 95% from 2009 to 2010, and cases of wild poliovirus type 3 (WPV3) fell by 92% globally over the same period. In fact, no case has been reported in India since February 2011, such that India may be on the verge of eradicating polio. Nevertheless, polio control experts are particularly worried about Vaccine-Derived Poliovirus (VDPV). Global surveillance efforts picked up 430 cases of VDPV from several countries between July 2009 and March 2011. In India, 7 cases of VDPV were reported during the year 2011. As long as OPV is used, virologists say that the world is at risk of VDPV causing polio in unprotected children. Achieving a polio-free world will require the "cessation of all OPV" and with it the elimination of the risk of vaccine-associated paralytic polio (VAPP) or VDPV infections. To this effect, in 2011 the Global Polio Eradication Initiative (GPEI) will produce and develop a new roadmap for VDPV Elimination. Several countries have shifted from all OPV to sequential OPV-IPV schedules and all-IPV schedules with elimination of live poliovirus. IPV will be indispensable in the post-eradication era when use of OPV has to stop but "vaccination against polio" cannot stop. IPV offers complete individual protection and has been considered as an additional tool at present for those who can afford the vaccine, and since we are nearing the eradication of polio, it is time to shift from OPV to sequential OPV-IPV schedule in India. Such a strategy will avoid inevitable problems with VAPP.

  15. Time-dependent enhancement of lymphocyte activation by mitogens after exposure to isolation or water scheduling.

    Science.gov (United States)

    Jessop, J J; Gale, K; Bayer, B M

    1988-01-01

    The effects of isolation and water scheduling on mitogen induced lymphocyte proliferation were investigated. Isolated rats were animals which had been raised in group-housed conditions and then transferred to individual cages with ad lib access to water for a 1 or 2 week period. Water scheduled rats were maintained in group housing (5 rats per cage) with ad lib access to food but with access to water for a single 30 minute session each day. Responses of these groups were compared to those of animals which had been continuously group-housed with ad lib access to food and water. No differences in lymphocyte responses to phytohemagglutinin (PHA) were found 1 week after exposure to isolation. However, after 2 weeks, splenic and blood T lymphocytes from isolated animals demonstrated an increased proliferative response to suboptimum and maximum concentrations of PHA. Splenic B lymphocyte responses to lipopolysaccharide (LPS) from isolated animals were also increased by 2- to 3-fold compared to group-housed controls. Two weeks of exposure of animals to daily water scheduling similarly increased the splenic lymphocyte proliferation. This increased responsiveness to PHA was not accompanied by a significant change in the sensitivity of the lymphocytes to PHA, in the total number of white blood cells, or the proportion of splenic T or T helper lymphocytes. Our results show that the increase in lymphocyte proliferation is time-dependent, requires greater than 1 week of exposure to isolation and is due to factors other than changes in sensitivity to mitogen or T lymphocyte number.

  16. An on-time power-aware scheduling scheme for medical sensor SoC-based WBAN systems.

    Science.gov (United States)

    Hwang, Tae-Ho; Kim, Dong-Sun; Kim, Jung-Guk

    2012-12-27

    The focus of many leading technologies in the field of medical sensor systems is on low power consumption and robust data transmission. For example, the implantable cardioverter-defibrillator (ICD), which is used to maintain the heart in a healthy state, requires a reliable wireless communication scheme with an extremely low duty-cycle, high bit rate, and energy-efficient media access protocols. Because such devices must be sustained for over 5 years without access to battery replacement, they must be designed to have extremely low power consumption in sleep mode. Here, an on-time, energy-efficient scheduling scheme is proposed that performs power adjustments to minimize the sleep-mode current. The novelty of this scheduler is that it increases the determinacy of power adjustment and the predictability of scheduling by employing non-pre-emptible dual priority scheduling. This predictable scheduling also guarantees the punctuality of important periodic tasks based on their serialization, by using their worst case execution time) and the power consumption optimization. The scheduler was embedded into a system on chip (SoC) developed to support the wireless body area network-a wakeup-radio and wakeup-timer for implantable medical devices. This scheduling system is validated by the experimental results of its performance when used with life-time extensions of ICD devices.

  17. An On-Time Power-Aware Scheduling Scheme for Medical Sensor SoC-Based WBAN Systems

    Science.gov (United States)

    Hwang, Tae-Ho; Kim, Dong-Sun; Kim, Jung-Guk

    2013-01-01

    The focus of many leading technologies in the field of medical sensor systems is on low power consumption and robust data transmission. For example, the implantable cardioverter-defibrillator (ICD), which is used to maintain the heart in a healthy state, requires a reliable wireless communication scheme with an extremely low duty-cycle, high bit rate, and energy-efficient media access protocols. Because such devices must be sustained for over 5 years without access to battery replacement, they must be designed to have extremely low power consumption in sleep mode. Here, an on-time, energy-efficient scheduling scheme is proposed that performs power adjustments to minimize the sleep-mode current. The novelty of this scheduler is that it increases the determinacy of power adjustment and the predictability of scheduling by employing non-pre-emptible dual priority scheduling. This predictable scheduling also guarantees the punctuality of important periodic tasks based on their serialization, by using their worst case execution time) and the power consumption optimization. The scheduler was embedded into a system on chip (SoC) developed to support the wireless body area network—a wakeup-radio and wakeup-timer for implantable medical devices. This scheduling system is validated by the experimental results of its performance when used with life-time extensions of ICD devices. PMID:23271602

  18. An On-Time Power-Aware Scheduling Scheme for Medical Sensor SoC-Based WBAN Systems

    Directory of Open Access Journals (Sweden)

    Jung-Guk Kim

    2012-12-01

    Full Text Available The focus of many leading technologies in the field of medical sensor systems is on low power consumption and robust data transmission. For example, the implantable cardioverter-defibrillator (ICD, which is used to maintain the heart in a healthy state, requires a reliable wireless communication scheme with an extremely low duty-cycle, high bit rate, and energy-efficient media access protocols. Because such devices must be sustained for over 5 years without access to battery replacement, they must be designed to have extremely low power consumption in sleep mode. Here, an on-time, energy-efficient scheduling scheme is proposed that performs power adjustments to minimize the sleep-mode current. The novelty of this scheduler is that it increases the determinacy of power adjustment and the predictability of scheduling by employing non-pre-emptible dual priority scheduling. This predictable scheduling also guarantees the punctuality of important periodic tasks based on their serialization, by using their worst case execution time and the power consumption optimization. The scheduler was embedded into a system on chip (SoC developed to support the wireless body area network—a wakeup-radio and wakeup-timer for implantable medical devices. This scheduling system is validated by the experimental results of its performance when used with life-time extensions of ICD devices.

  19. Schedule Analytics

    Science.gov (United States)

    2016-04-30

    Warfare, Naval Sea Systems Command Acquisition Cycle Time : Defining the Problem David Tate, Institute for Defense Analyses Schedule Analytics Jennifer...research was comprised of the following high- level steps :  Identify and review primary data sources 1...research. However, detailed reviews of the OMB IT Dashboard data revealed that schedule data is highly aggregated. Program start date and program end date

  20. Development of Real-Time Measurement of Effective Dose for High Dose Rate Neutron Fields

    International Nuclear Information System (INIS)

    Braby, L. A.; Reece, W. D.; Hsu, W. H.

    2003-01-01

    Studies of the effects of low doses of ionizing radiation require sources of radiation which are well characterized in terms of the dose and the quality of the radiation. One of the best measures of the quality of neutron irradiation is the dose mean lineal energy. At very low dose rates this can be determined by measuring individual energy deposition events, and calculating the dose mean of the event size. However, at the dose rates that are normally required for biology experiments, the individual events can not be separated by radiation detectors. However, the total energy deposited in a specified time interval can be measured. This total energy has a random variation which depends on the size of the individual events, so the dose mean lineal energy can be calculated from the variance of repeated measurements of the energy deposited in a fixed time. We have developed a specialized charge integration circuit for the measurement of the charge produced in a small ion chamber in typical neutron irradiation experiments. We have also developed 4.3 mm diameter ion chambers with both tissue equivalent and carbon walls for the purpose of measuring dose mean lineal energy due to all radiations and due to all radiations except neutrons, respectively. By adjusting the gas pressure in the ion chamber, it can be made to simulate tissue volumes from a few nanometers to a few millimeters in diameter. The charge is integrated for 0.1 seconds, and the resulting pulse height is recorded by a multi channel analyzer. The system has been used in a variety of photon and neutron radiation fields, and measured values of dose and dose mean lineal energy are consistent with values extrapolated from measurements made by other techniques at much lower dose rates. It is expected that this technique will prove to be much more reliable than extrapolations from measurements made at low dose rates because these low dose rate exposures generally do not accurately reproduce the attenuation and

  1. Real-time personal dose monitoring and management system

    International Nuclear Information System (INIS)

    Zhang Zhiyong; Cheng Chang; Yang Huating; Liu Zhengshan; Deng Changming; Li Mei

    2000-01-01

    This paper mainly describes a real-time personal dose monitoring and management system. The system is composed of three parts that include SDM-98 semiconductor detector personal dosimeters, Data Readers and a Management System Software. It can be used for personal dose monitoring and management and other controlling actions in a radioactive controlled area. Adopting semiconductor detector and microcontroller, SDM-98 Personal Dosimeter is used to measure personal accumulated dose equivalent and dose rate caused by X-ray and Gamma ray. The results can be read directly on LCD. All the data stored in dosimeter can be transmitted into a data reader by infrared optical link. The alarm threshold can be adjusted successively in whole range of dose or dose rate. The Data Reader is an intelligent interface between the dosimeter and master computer. The data received from dosimeter will be sent to a master computer through RS-232 serial interface. According to the master computer's order, the Data Reader can turn on the dosimeter's power at entrance and shutdown it at exit. The Management System Software which written by Visual BASIC 5.0 runs on MS Win95. All the measuring data from dosimeters can be analyzed and treated according to requirements and stored in database. Therefore, some figures and tables relative to dose or rate can be shown on screen or printed out. (author)

  2. Biologically-equivalent dose and long-term survival time in radiation treatments

    International Nuclear Information System (INIS)

    Zaider, Marco; Hanin, Leonid

    2007-01-01

    Within the linear-quadratic model the biologically-effective dose (BED)-taken to represent treatments with an equal tumor control probability (TCP)-is commonly (and plausibly) calculated according to BED(D) = -log[S(D)]/α. We ask whether in the presence of cellular proliferation this claim is justified and examine, as a related question, the extent to which BED approximates an isoeffective dose (IED) defined, more sensibly, in terms of an equal long-term survival probability, rather than TCP. We derive, under the assumption that cellular birth and death rates are time homogeneous, exact equations for the isoeffective dose, IED. As well, we give a rigorous definition of effective long-term survival time, T eff . By using several sets of radiobiological parameters, we illustrate potential differences between BED and IED on the one hand and, on the other, between T eff calculated as suggested here or by an earlier recipe. In summary: (a) the equations currently in use for calculating the effective treatment time may underestimate the isoeffective dose and should be avoided. The same is the case for the tumor control probability (TCP), only more so; (b) for permanent implants BED may be a poor substitute for IED; (c) for a fractionated treatment schedule, interpreting the observed probability of cure in terms of a TCP formalism that refers to the end of the treatment (rather than T eff ) may result in a miscalculation (underestimation) of the initial number of clonogens

  3. Evaluating the performance of constructive heuristics for the blocking flow shop scheduling problem with setup times

    Directory of Open Access Journals (Sweden)

    Mauricio Iwama Takano

    2019-01-01

    Full Text Available This paper addresses the minimization of makespan for the permutation flow shop scheduling problem with blocking and sequence and machine dependent setup times, a problem not yet studied in previous studies. The 14 best known heuristics for the permutation flow shop problem with blocking and no setup times are pre-sented and then adapted to the problem in two different ways; resulting in 28 different heuristics. The heuristics are then compared using the Taillard database. As there is no other work that addresses the problem with blocking and sequence and ma-chine dependent setup times, a database for the setup times was created. The setup time value was uniformly distributed between 1% and 10%, 50%, 100% and 125% of the processing time value. Computational tests are then presented for each of the 28 heuristics, comparing the mean relative deviation of the makespan, the computational time and the percentage of successes of each method. Results show that the heuristics were capable of providing interesting results.

  4. Joint optimization of green vehicle scheduling and routing problem with time-varying speeds

    Science.gov (United States)

    Zhang, Dezhi; Wang, Xin; Ni, Nan; Zhang, Zhuo

    2018-01-01

    Based on an analysis of the congestion effect and changes in the speed of vehicle flow during morning and evening peaks in a large- or medium-sized city, the piecewise function is used to capture the rules of the time-varying speed of vehicles, which are very important in modelling their fuel consumption and CO2 emission. A joint optimization model of the green vehicle scheduling and routing problem with time-varying speeds is presented in this study. Extra wages during nonworking periods and soft time-window constraints are considered. A heuristic algorithm based on the adaptive large neighborhood search algorithm is also presented. Finally, a numerical simulation example is provided to illustrate the optimization model and its algorithm. Results show that, (1) the shortest route is not necessarily the route that consumes the least energy, (2) the departure time influences the vehicle fuel consumption and CO2 emissions and the optimal departure time saves on fuel consumption and reduces CO2 emissions by up to 5.4%, and (3) extra driver wages have significant effects on routing and departure time slot decisions. PMID:29466370

  5. Heuristic and Exact Algorithms for the Two-Machine Just in Time Job Shop Scheduling Problem

    Directory of Open Access Journals (Sweden)

    Mohammed Al-Salem

    2016-01-01

    Full Text Available The problem addressed in this paper is the two-machine job shop scheduling problem when the objective is to minimize the total earliness and tardiness from a common due date (CDD for a set of jobs when their weights equal 1 (unweighted problem. This objective became very significant after the introduction of the Just in Time manufacturing approach. A procedure to determine whether the CDD is restricted or unrestricted is developed and a semirestricted CDD is defined. Algorithms are introduced to find the optimal solution when the CDD is unrestricted and semirestricted. When the CDD is restricted, which is a much harder problem, a heuristic algorithm is proposed to find approximate solutions. Through computational experiments, the heuristic algorithms’ performance is evaluated with problems up to 500 jobs.

  6. Affordable CZT SPECT with dose-time minimization (Conference Presentation)

    Science.gov (United States)

    Hugg, James W.; Harris, Brian W.; Radley, Ian

    2017-03-01

    PURPOSE Pixelated CdZnTe (CZT) detector arrays are used in molecular imaging applications that can enable precision medicine, including small-animal SPECT, cardiac SPECT, molecular breast imaging (MBI), and general purpose SPECT. The interplay of gamma camera, collimator, gantry motion, and image reconstruction determines image quality and dose-time-FOV tradeoffs. Both dose and exam time can be minimized without compromising diagnostic content. METHODS Integration of pixelated CZT detectors with advanced ASICs and readout electronics improves system performance. Because historically CZT was expensive, the first clinical applications were limited to small FOV. Radiation doses were initially high and exam times long. Advances have significantly improved efficiency of CZT-based molecular imaging systems and the cost has steadily declined. We have built a general purpose SPECT system using our 40 cm x 53 cm CZT gamma camera with 2 mm pixel pitch and characterized system performance. RESULTS Compared to NaI scintillator gamma cameras: intrinsic spatial resolution improved from 3.8 mm to 2.0 mm; energy resolution improved from 9.8% to reconstruction, result in minimized dose and exam time. With CZT cost improving, affordable whole-body CZT general purpose SPECT is expected to enable precision medicine applications.

  7. interactive effect of cowpea variety, dose and exposure time

    African Journals Online (AJOL)

    ACSS

    variety (V), exposure time (T) and dose (D) on the tolerance of C. maculatus to both plant materials. The effect ... laboratories and institutions of higher education in several West .... Each value is the mean±S.E of 20 cowpea seeds. Means ...

  8. interactive effect of cowpea variety, dose and exposure time

    African Journals Online (AJOL)

    ACSS

    Callosobruchus maculatus has for years remained a serious menace in cowpea in Sub-Sahara Africa. The objective of this study was to investigate the effect of genotypic cowpea (Vigna unguiculata (L.) Walp) varieties, time and dose on C. maculatus exposed to powders of Piper guineense and Eugenia aromatica.

  9. A real time dose monitoring and dose reconstruction tool for patient specific VMAT QA and delivery

    International Nuclear Information System (INIS)

    Tyagi, Neelam; Yang Kai; Gersten, David; Yan Di

    2012-01-01

    Purpose: To develop a real time dose monitoring and dose reconstruction tool to identify and quantify sources of errors during patient specific volumetric modulated arc therapy (VMAT) delivery and quality assurance. Methods: The authors develop a VMAT delivery monitor tool called linac data monitor that connects to the linac in clinical mode and records, displays, and compares real time machine parameters with the planned parameters. A new measure, called integral error, keeps a running total of leaf overshoot and undershoot errors in each leaf pair, multiplied by leaf width, and the amount of time during which the error exists in monitor unit delivery. Another tool reconstructs Pinnacle 3 ™ format delivered plan based on the saved machine logfile and recalculates actual delivered dose in patient anatomy. Delivery characteristics of various standard fractionation and stereotactic body radiation therapy (SBRT) VMAT plans delivered on Elekta Axesse and Synergy linacs were quantified. Results: The MLC and gantry errors for all the treatment sites were 0.00 ± 0.59 mm and 0.05 ± 0.31°, indicating a good MLC gain calibration. Standard fractionation plans had a larger gantry error than SBRT plans due to frequent dose rate changes. On average, the MLC errors were negligible but larger errors of up to 6 mm and 2.5° were seen when dose rate varied frequently. Large gantry errors occurred during the acceleration and deceleration process, and correlated well with MLC errors (r= 0.858, p= 0.0004). PTV mean, minimum, and maximum dose discrepancies were 0.87 ± 0.21%, 0.99 ± 0.59%, and 1.18 ± 0.52%, respectively. The organs at risk (OAR) doses were within 2.5%, except some OARs that showed up to 5.6% discrepancy in maximum dose. Real time displayed normalized total positive integral error (normalized to the total monitor units) correlated linearly with MLC (r= 0.9279, p < 0.001) and gantry errors (r= 0.742, p= 0.005). There is a strong correlation between total integral

  10. Real-time objects development: Study and proposal for a parallel scheduling architecture

    International Nuclear Information System (INIS)

    Rioux, Laurent

    1997-01-01

    This thesis contributes to the programming and the execution control of real-time object oriented applications. Using real-time objects is very interesting for programming real- time applications, because this model can introduce the concurrence with the encapsulation properties, with modularity and reusability by taking into account the real-time constraints of the application. One essential quality of this approach is that it can directly specify the parallelism and the real-time constraints at the model level of the application. An annotation system of C++ has been defined to describe the real-time specifications in the model (or in the source code) of the application. It will supply to the execution support the different information it needs for the control. In this approach of multitasking, the control is distributed and encapsulated inside each real time object. Three complementary levels of control have been defined: the state level (defining the capability of an object to treat an operation), the concurrence level (assuring the coherence between the object attributes) and a scheduling control (allocating the processors resources to the object by taking real-time constraints into account). The proposed control architecture, named OROS, manages the attribute access of each object in an individual way, then it can parallel treatments which do not access at the same data. This architecture makes a dynamic control of an application that can take benefit from the parallelism of the new machines both for the execution parallelism and the control itself. This architecture uses only the simplest primitives of the industrial real-time operating systems which ensures its feasibility and portability. (author) [fr

  11. KERMA-based radiation dose management system for real-time patient dose measurement

    Science.gov (United States)

    Kim, Kyo-Tae; Heo, Ye-Ji; Oh, Kyung-Min; Nam, Sang-Hee; Kang, Sang-Sik; Park, Ji-Koon; Song, Yong-Keun; Park, Sung-Kwang

    2016-07-01

    Because systems that reduce radiation exposure during diagnostic procedures must be developed, significant time and financial resources have been invested in constructing radiation dose management systems. In the present study, the characteristics of an existing ionization-based system were compared to those of a system based on the kinetic energy released per unit mass (KERMA). Furthermore, the feasibility of using the KERMA-based system for patient radiation dose management was verified. The ionization-based system corrected the effects resulting from radiation parameter perturbations in general radiography whereas the KERMA-based system did not. Because of this difference, the KERMA-based radiation dose management system might overestimate the patient's radiation dose due to changes in the radiation conditions. Therefore, if a correction factor describing the correlation between the systems is applied to resolve this issue, then a radiation dose management system can be developed that will enable real-time measurement of the patient's radiation exposure and acquisition of diagnostic images.

  12. Pruning-Based, Energy-Optimal, Deterministic I/O Device Scheduling for Hard Real-Time Systems

    Science.gov (United States)

    2005-02-01

    However, DPM via I/O device scheduling for hard real - time systems has received relatively little attention. In this paper,we present an offline I/O...polynomial time. We present experimental results to show that EDS and MDO reduce the energy consumption of I/O devices significantly for hard real - time systems .

  13. Scheduling and Voltage Scaling for Energy/Reliability Trade-offs in Fault-Tolerant Time-Triggered Embedded Systems

    DEFF Research Database (Denmark)

    Pop, Paul; Poulsen, Kåre Harbo; Izosimov, Viacheslav

    2007-01-01

    -execution and dynamic voltage scaling-based low-power techniques are competing for the slack in the schedules. Our approach decides the voltage levels and start times of processes and the transmission times of messages, such that the transient faults are tolerated, the timing constraints of the application...

  14. Real-time electron-beam dose monitoring

    International Nuclear Information System (INIS)

    McKeown, J.

    1995-01-01

    A new technique to monitor the integrated dose that a product receives in an irradiation facility is determined by collecting the charge that passes through the product. The technique allows the absorbed dose to be monitored as the irradiation is taking place, i.e. on-line and in real time. The procedure will also provide a means of directly measuring the electron energy, independent of the accelerator control system. The irradiation plant operator can immediately detect a problem of inadequate electron energy and take appropriate action. Examples taken on the IMPELA trademark accelerator at the Iotron Irradiation Facility in Vancouver are presented

  15. A real-time internal dose assessment exercise

    International Nuclear Information System (INIS)

    Bingham, D.; Bull, R. K.

    2013-01-01

    A real-time internal dose assessment exercise has been conducted in which participants were required to make decisions about sampling requirements, seek relevant information about the 'incident' and make various interim dose assessments. At the end of the exercise, each participant was requested to make a formal assessment, providing statements of the methods, models and assumptions used in that assessment. In this paper we describe how the hypothetical assessment case was set up and the exercise was conducted, the responses of the participants and the assessments of dose that they made. Finally we discuss the lessons learnt from the exercise and suggest how the exercise may be adapted to a wider range of participants. (authors)

  16. Steep Dose-Response Relationship for Stage I Non-Small-Cell Lung Cancer Using Hypofractionated High-Dose Irradiation by Real-Time Tumor-Tracking Radiotherapy

    International Nuclear Information System (INIS)

    Onimaru, Rikiya; Fujino, Masaharu; Yamazaki, Koichi; Onodera, Yuya; Taguchi, Hiroshi; Katoh, Norio; Hommura, Fumihiro; Oizumi, Satoshi; Nishimura, Masaharu; Shirato, Hiroki

    2008-01-01

    Purpose: To investigate the clinical outcomes of patients with pathologically proven, peripherally located, Stage I non-small-cell lung cancer who had undergone stereotactic body radiotherapy using real-time tumor tracking radiotherapy during the developmental period. Methods and Materials: A total of 41 patients (25 with Stage T1 and 16 with Stage T2) were admitted to the study between February 2000 and June 2005. A 5-mm planning target volume margin was added to the clinical target volume determined with computed tomography at the end of the expiratory phase. The gating window ranged from ±2 to 3 mm. The dose fractionation schedule was 40 or 48 Gy in four fractions within 1 week. The dose was prescribed at the center of the planning target volume, giving more than an 80% dose at the planning target volume periphery. Results: For 28 patients treated with 48 Gy in four fractions, the overall actuarial survival rate at 3 years was 82% for those with Stage IA and 32% for those with Stage IB. For patients treated with 40 Gy in four fractions within 1 week, the overall actuarial survival rate at 3 years was 50% for those with Stage IA and 0% for those with Stage IB. A significant difference was found in local control between those with Stage IB who received 40 Gy vs. 48 Gy (p = 0.0015) but not in those with Stage IA (p = 0.5811). No serious radiation morbidity was observed with either dose schedule. Conclusion: The results of our study have shown that 48 Gy in four fractions within 1 week is a safe and effective treatment for peripherally located, Stage IA non-small-cell lung cancer. A steep dose-response curve between 40 and 48 Gy using a daily dose of 12 Gy delivered within 1 week was identified for Stage IB non-small-cell lung cancer in stereotactic body radiotherapy using real-time tumor tracking radiotherapy

  17. Time-Dependent Neutron and Photon Dose-Field Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Wooten, Hasani Omar [Georgia Inst. of Technology, Atlanta, GA (United States)

    2005-08-01

    A unique tool is developed that allows the user to model physical representations of complicated glovebox facilities in two dimensions and determine neutral-particle flux and ambient dose-equivalent fields throughout that geometry. The Pandemonium code, originally designed to determine flux and dose-rates only, is improved to include realistic glovebox geometries, time-dependent source and detector positions, time-dependent shielding thickness calculations, time-integrated doses, a representative criticality accident scenario based on time-dependent reactor kinetics, and more rigorous photon treatment. A primary benefit of this work has been an extensive analysis and improvement of the photon model that is not limited to the application described in this thesis. The photon model has been extended in energy range to 10 MeV to include photons from fission and new photon buildup factors have been included that account for the effects of photon buildup at slant-path thicknesses as a function of angle, where the mean free path thickness has been preserved. The overall system of codes is user-friendly and it is directly applicable to facilities such as the plutonium facility at Los Alamos National Laboratory, where high-intensity neutron and photon emitters are regularly used. The codes may be used to determine a priori doses for given work scenarios in an effort to supply dose information to process models which will in turn assist decision makers on ensuring as low as reasonably achievable (ALARA) compliance. In addition, coupling the computational results of these tools with the process model visualization tools will help to increase worker safety and radiological safety awareness.

  18. Development of a real-time radiological dose assessment system

    Energy Technology Data Exchange (ETDEWEB)

    Han, Moon Hee; Lee, Young Bok; Kim, Eun Han; Suh, Kyung Suk; Hwang, Won Tae; Choi, Young Gil

    1997-07-01

    A radiological dose assessment system named FADAS has been developed. This system is necessary to estimated the radiological consequences against a nuclear accident. Mass-consistent wind field module was adopted for the generation of wind field over the whole domain using the several measured wind data. Random-walk dispersion module is used for the calculation of the distribution of radionuclides in the atmosphere. And volume-equivalent numerical integration method has been developed for the assessment of external gamma exposure given from a randomly distributed radioactive materials and a dose data library has been made for rapid calculation. Field tracer experiments have been carried out for the purpose of analyzing the site-specific meteorological characteristics and increasing the accuracy of wind field generation and atmospheric dispersion module of FADAS. At first, field tracer experiment was carried out over flat terrain covered with rice fields using the gas samplers which were designed and manufactured by the staffs of KAERI. The sampled gas was analyzed using gas chromatograph. SODAR and airsonde were used to measure the upper wind. Korean emergency preparedness system CARE was integrated at Kori 4 nuclear power plants in 1995. One of the main functions of CARE is to estimate the radiological dose. The developed real-time dose assessment system FADAS was adopted in CARE as a tool for the radiological dose assessment. (author). 79 refs., 52 tabs., 94 figs.

  19. ADAPTATION OF JOHNSON SEQUENCING ALGORITHM FOR JOB SCHEDULING TO MINIMISE THE AVERAGE WAITING TIME IN CLOUD COMPUTING ENVIRONMENT

    Directory of Open Access Journals (Sweden)

    SOUVIK PAL

    2016-09-01

    Full Text Available Cloud computing is an emerging paradigm of Internet-centric business computing where Cloud Service Providers (CSPs are providing services to the customer according to their needs. The key perception behind cloud computing is on-demand sharing of resources available in the resource pool provided by CSP, which implies new emerging business model. The resources are provisioned when jobs arrive. The job scheduling and minimization of waiting time are the challenging issue in cloud computing. When a large number of jobs are requested, they have to wait for getting allocated to the servers which in turn may increase the queue length and also waiting time. This paper includes system design for implementation which is concerned with Johnson Scheduling Algorithm that provides the optimal sequence. With that sequence, service times can be obtained. The waiting time and queue length can be reduced using queuing model with multi-server and finite capacity which improves the job scheduling model.

  20. A Time Scheduling Model of Logistics Service Supply Chain Based on the Customer Order Decoupling Point: A Perspective from the Constant Service Operation Time

    Science.gov (United States)

    Yang, Yi; Xu, Haitao; Liu, Xiaoyan; Wang, Yijia; Liang, Zhicheng

    2014-01-01

    In mass customization logistics service, reasonable scheduling of the logistics service supply chain (LSSC), especially time scheduling, is benefit to increase its competitiveness. Therefore, the effect of a customer order decoupling point (CODP) on the time scheduling performance should be considered. To minimize the total order operation cost of the LSSC, minimize the difference between the expected and actual time of completing the service orders, and maximize the satisfaction of functional logistics service providers, this study establishes an LSSC time scheduling model based on the CODP. Matlab 7.8 software is used in the numerical analysis for a specific example. Results show that the order completion time of the LSSC can be delayed or be ahead of schedule but cannot be infinitely advanced or infinitely delayed. Obtaining the optimal comprehensive performance can be effective if the expected order completion time is appropriately delayed. The increase in supply chain comprehensive performance caused by the increase in the relationship coefficient of logistics service integrator (LSI) is limited. The relative concern degree of LSI on cost and service delivery punctuality leads to not only changes in CODP but also to those in the scheduling performance of the LSSC. PMID:24715818

  1. A time scheduling model of logistics service supply chain based on the customer order decoupling point: a perspective from the constant service operation time.

    Science.gov (United States)

    Liu, Weihua; Yang, Yi; Xu, Haitao; Liu, Xiaoyan; Wang, Yijia; Liang, Zhicheng

    2014-01-01

    In mass customization logistics service, reasonable scheduling of the logistics service supply chain (LSSC), especially time scheduling, is benefit to increase its competitiveness. Therefore, the effect of a customer order decoupling point (CODP) on the time scheduling performance should be considered. To minimize the total order operation cost of the LSSC, minimize the difference between the expected and actual time of completing the service orders, and maximize the satisfaction of functional logistics service providers, this study establishes an LSSC time scheduling model based on the CODP. Matlab 7.8 software is used in the numerical analysis for a specific example. Results show that the order completion time of the LSSC can be delayed or be ahead of schedule but cannot be infinitely advanced or infinitely delayed. Obtaining the optimal comprehensive performance can be effective if the expected order completion time is appropriately delayed. The increase in supply chain comprehensive performance caused by the increase in the relationship coefficient of logistics service integrator (LSI) is limited. The relative concern degree of LSI on cost and service delivery punctuality leads to not only changes in CODP but also to those in the scheduling performance of the LSSC.

  2. Near-Optimal Heuristics for Just-In-Time Jobs Maximization in Flow Shop Scheduling

    Directory of Open Access Journals (Sweden)

    Helio Yochihiro Fuchigami

    2018-04-01

    Full Text Available The number of just-in-time jobs maximization in a permutation flow shop scheduling problem is considered. A mixed integer linear programming model to represent the problem as well as solution approaches based on enumeration and constructive heuristics were proposed and computationally implemented. Instances with up to 10 jobs and five machines are solved by the mathematical model in an acceptable running time (3.3 min on average while the enumeration method consumes, on average, 1.5 s. The 10 constructive heuristics proposed show they are practical especially for large-scale instances (up to 100 jobs and 20 machines, with very good-quality results and efficient running times. The best two heuristics obtain near-optimal solutions, with only 0.6% and 0.8% average relative deviations. They prove to be better than adaptations of the NEH heuristic (well-known for providing very good solutions for makespan minimization in flow shop for the considered problem.

  3. Model-based schedulability analysis of safety critical hard real-time Java programs

    DEFF Research Database (Denmark)

    Bøgholm, Thomas; Kragh-Hansen, Henrik; Olsen, Petur

    2008-01-01

    verifiable by the Uppaal model checker [23]. Schedulability analysis is reduced to a simple reachability question, checking for deadlock freedom. Model-based schedulability analysis has been developed by Amnell et al. [2], but has so far only been applied to high level specifications, not actual...

  4. Degree of Schedulability of Mixed-Criticality Real-time Systems with Probabilistic Sporadic Tasks

    DEFF Research Database (Denmark)

    Boudjadar, Jalil; David, Alexandre; Kim, Jin Hyun

    2014-01-01

    We present the concept of degree of schedulability for mixed-criticality scheduling systems. This concept is given in terms of the two factors 1) Percentage of Missed Deadlines (PoMD), and 2) Degradation of the Quality of Service (DoQoS). The novel aspect is that we consider task arrival patterns...

  5. Optimization of design and erection methods to minimize the construction time-schedule of EPR plants

    International Nuclear Information System (INIS)

    Pierrat, Michel; L'Huby, Yvan; Decelle, Alain

    1999-01-01

    This paper presents the results of the investigations made during the Basic Design of the EPR project (European Pressurized water Reactor) to shorten the construction schedule. A 57 months construction schedule can be reached for the first unit. The investigations concern both design and construction methods. (author)

  6. A Metaheuristic Scheduler for Time Division Multiplexed Network-on-Chip

    DEFF Research Database (Denmark)

    Sørensen, Rasmus Bo; Sparsø, Jens; Pedersen, Mark Ruvald

    that this is possible with only negligible impact on the schedule period. We evaluate the scheduler with seven different applications from the MCSL NOC benchmark suite. We observe that the metaheuristics perform better than the greedy solution. In the special case of all-to-all communication with equal bandwidths...

  7. T-L Plane Abstraction-Based Energy-Efficient Real-Time Scheduling for Multi-Core Wireless Sensors

    Directory of Open Access Journals (Sweden)

    Youngmin Kim

    2016-07-01

    Full Text Available Energy efficiency is considered as a critical requirement for wireless sensor networks. As more wireless sensor nodes are equipped with multi-cores, there are emerging needs for energy-efficient real-time scheduling algorithms. The T-L plane-based scheme is known to be an optimal global scheduling technique for periodic real-time tasks on multi-cores. Unfortunately, there has been a scarcity of studies on extending T-L plane-based scheduling algorithms to exploit energy-saving techniques. In this paper, we propose a new T-L plane-based algorithm enabling energy-efficient real-time scheduling on multi-core sensor nodes with dynamic power management (DPM. Our approach addresses the overhead of processor mode transitions and reduces fragmentations of the idle time, which are inherent in T-L plane-based algorithms. Our experimental results show the effectiveness of the proposed algorithm compared to other energy-aware scheduling methods on T-L plane abstraction.

  8. A decision support system for real-time hydropower scheduling in a competitive power market environment

    Science.gov (United States)

    Shawwash, Ziad Khaled Elias

    2000-10-01

    The electricity supply market is rapidly changing from a monopolistic to a competitive environment. Being able to operate their system of reservoirs and generating facilities to get maximum benefits out of existing assets and resources is important to the British Columbia Hydro Authority (B.C. Hydro). A decision support system has been developed to help B.C. Hydro operate their system in an optimal way. The system is operational and is one of the tools that are currently used by the B.C. Hydro system operations engineers to determine optimal schedules that meet the hourly domestic load and also maximize the value B.C. Hydro obtains from spot transactions in the Western U.S. and Alberta electricity markets. This dissertation describes the development and implementation of the decision support system in production mode. The decision support system consists of six components: the input data preparation routines, the graphical user interface (GUI), the communication protocols, the hydraulic simulation model, the optimization model, and the results display software. A major part of this work involved the development and implementation of a practical and detailed large-scale optimization model that determines the optimal tradeoff between the long-term value of water and the returns from spot trading transactions in real-time operations. The postmortem-testing phase showed that the gains in value from using the model accounted for 0.25% to 1.0% of the revenues obtained. The financial returns from using the decision support system greatly outweigh the costs of building it. Other benefits are the savings in the time needed to prepare the generation and trading schedules. The system operations engineers now can use the time saved to focus on other important aspects of their job. The operators are currently experimenting with the system in production mode, and are gradually gaining confidence that the advice it provides is accurate, reliable and sensible. The main lesson

  9. Time of administration important? Morning versus evening dosing of valsartan.

    Science.gov (United States)

    Zappe, Dion H; Crikelair, Nora; Kandra, Albert; Palatini, Paolo

    2015-02-01

    Studies suggest that bedtime dosing of an angiotensin-converting enzyme (ACE)-inhibitor or angiotensin receptor blocker shows a more sustained and consistent 24-h antihypertensive profile, including greater night-time blood pressure (BP) reduction. We compared the antihypertensive effects of morning (a.m.) and evening (p.m.) dosing of valsartan on 24-h BP. This 26-week, multicentre, randomized, double-blind study evaluated the efficacy and safety of valsartan 320 mg, dosed a.m. or p.m., versus lisinopril 40 mg (a.m.), a long-acting ACE-inhibitor, in patients with grade 1-2 hypertension and at least one additional cardiovascular risk factor. Patients (n = 1093; BP = 156 ± 11/91 ± 8 mmHg; 62 years, 56% male, 99% white) received (1 : 1 : 1) valsartan 160 mg a.m. or p.m. or lisinopril 20 mg a.m. for 4 weeks, then force-titrated to double the initial dose for 8 weeks. At Week 12, hydrochlorothiazide (HCTZ) 12.5 mg was added for 14 weeks if office BP was more than 140/90 mmHg and/or ambulatory BP more than 130/80 mmHg. Mean 24-h ambulatory SBP change from baseline to Weeks 12 and 26 was comparable between valsartan a.m. (-10.6 and -13.3 mmHg) and p.m. (-9.8 and -12.3 mmHg) and lisinopril (-10.7 and -13.7 mmHg). There was no benefit of valsartan p.m. versus a.m. on night-time BP, early morning BP and morning BP surge. Evening dosing also did not improve BP lowering in patients requiring add-on HCTZ or in nondippers at baseline. All treatments were well tolerated. Once-daily dosing of valsartan 320 mg results in equally effective 24-h BP efficacy, regardless of dosing time. ClinicalTrials.gov Identifier: NCT00241124.

  10. Disruption Management for the Real-Time Home Caregiver Scheduling and Routing Problem

    Directory of Open Access Journals (Sweden)

    Biao Yuan

    2017-11-01

    Full Text Available The aggravating trend of the aging population, the miniaturization of the family structure, and the increase of families with empty nesters greatly affect the sustainable development of the national economy and social old-age security system of China. The emergence of home health care or home care (HHC/HC service mode provides an alternative for elderly care. How to develop and apply this new mobile service mode is crucial for the government. Therefore, the pertinent optimization problems regarding HHC/HC have constantly attracted the attention of researchers. Unexpected events, such as new requests of customers, cancellations of customers’ services, and changes of customers’ time windows, may occur during the process of executing an a priori visiting plan. These events may sometimes make the original plan non-optimal or even infeasible. To cope with this situation, we introduce disruption management to the real-time home caregiver scheduling and routing problem. The deviation measurements on customers, caregivers, and companies are first defined. A mathematical model that minimizes the weighted sum of deviation measurements is then constructed. Next, a tabu search (TS heuristic is developed to efficiently solve the problem, and a cost recorded mechanism is used to strengthen the performance. Finally, by performing computational experiments on three real-life instances, the effectiveness of the TS heuristic is tested, and the advantages of disruption management are analyzed.

  11. An efficient genetic algorithm for a hybrid flow shop scheduling problem with time lags and sequence-dependent setup time

    Directory of Open Access Journals (Sweden)

    Farahmand-Mehr Mohammad

    2014-01-01

    Full Text Available In this paper, a hybrid flow shop scheduling problem with a new approach considering time lags and sequence-dependent setup time in realistic situations is presented. Since few works have been implemented in this field, the necessity of finding better solutions is a motivation to extend heuristic or meta-heuristic algorithms. This type of production system is found in industries such as food processing, chemical, textile, metallurgical, printed circuit board, and automobile manufacturing. A mixed integer linear programming (MILP model is proposed to minimize the makespan. Since this problem is known as NP-Hard class, a meta-heuristic algorithm, named Genetic Algorithm (GA, and three heuristic algorithms (Johnson, SPTCH and Palmer are proposed. Numerical experiments of different sizes are implemented to evaluate the performance of presented mathematical programming model and the designed GA in compare to heuristic algorithms and a benchmark algorithm. Computational results indicate that the designed GA can produce near optimal solutions in a short computational time for different size problems.

  12. Simultaneous Scheduling of Jobs, AGVs and Tools Considering Tool Transfer Times in Multi Machine FMS By SOS Algorithm

    Science.gov (United States)

    Sivarami Reddy, N.; Ramamurthy, D. V., Dr.; Prahlada Rao, K., Dr.

    2017-08-01

    This article addresses simultaneous scheduling of machines, AGVs and tools where machines are allowed to share the tools considering transfer times of jobs and tools between machines, to generate best optimal sequences that minimize makespan in a multi-machine Flexible Manufacturing System (FMS). Performance of FMS is expected to improve by effective utilization of its resources, by proper integration and synchronization of their scheduling. Symbiotic Organisms Search (SOS) algorithm is a potent tool which is a better alternative for solving optimization problems like scheduling and proven itself. The proposed SOS algorithm is tested on 22 job sets with makespan as objective for scheduling of machines and tools where machines are allowed to share tools without considering transfer times of jobs and tools and the results are compared with the results of existing methods. The results show that the SOS has outperformed. The same SOS algorithm is used for simultaneous scheduling of machines, AGVs and tools where machines are allowed to share tools considering transfer times of jobs and tools to determine the best optimal sequences that minimize makespan.

  13. Multi-Time Scale Coordinated Scheduling Strategy with Distributed Power Flow Controllers for Minimizing Wind Power Spillage

    Directory of Open Access Journals (Sweden)

    Yi Tang

    2017-11-01

    Full Text Available The inherent variability and randomness of large-scale wind power integration have brought great challenges to power flow control and dispatch. The distributed power flow controller (DPFC has the higher flexibility and capacity in power flow control in the system with wind generation. This paper proposes a multi-time scale coordinated scheduling model with DPFC to minimize wind power spillage. Configuration of DPFCs is initially determined by stochastic method. Afterward, two sequential procedures containing day-head and real-time scales are applied for determining maximum schedulable wind sources, optimal outputs of generating units and operation setting of DPFCs. The generating plan is obtained initially in day-ahead scheduling stage and modified in real-time scheduling model, while considering the uncertainty of wind power and fast operation of DPFC. Numerical simulation results in IEEE-RTS79 system illustrate that wind power is maximum scheduled with the optimal deployment and operation of DPFC, which confirms the applicability and effectiveness of the proposed method.

  14. Evaluation of different time schedules in training with the Da Vinci simulator.

    Science.gov (United States)

    Güldner, C; Orth, A; Dworschak, P; Diogo, I; Mandapathil, M; Teymoortash, A; Walliczek-Dworschak, U

    2017-10-01

    This prospective study analyzed the effect of different time schedules in training on the main performance outcomes: overall score, time to complete, and economy of motion. The study was performed on the da Vinci Skills Simulator from December 2014 to April 2016. Forty robotic novices were randomized into two groups of 20 participants, which trained in the same three exercises but with different intervals between their training sessions. Each group performed training in Peg Board 1 in their first week, Match Board 2 in their second week, and Ring and Rail 2 in their third week. On their last day, Needle Targeting and Energy Dissection 2, for which no previous training had been received, were performed. Regarding the different training intervals, group 1 trained each exercise six times in a row once a week. Group 2 performed their training once a day for 5 days. Technical performance parameters were recorded by the Mimics simulator software for further analysis. In addition, the participants were asked to fill out a questionnaire concerning the robotics training. Group 2 performed significantly better compared to group 1 in the main metrics in the more advanced exercises. For the easier exercises, the training frequency did not lead to significant differences in performance outcome. A significant skills gain was seen between the first and last training sessions for all exercises in both groups. Performance in the final exercise NT was significantly better in group 2 than group 1. Regarding ED 2, no difference was found between the two groups. As the training of group 2 led to significantly better outcomes, we suggest that, especially for advanced exercises, it seems to be more favorable to perform training every day for a short period than to train once a week six times in a row.

  15. Multiple time-scale optimization scheduling for islanded microgrids including PV, wind turbine, diesel generator and batteries

    DEFF Research Database (Denmark)

    Xiao, Zhao xia; Nan, Jiakai; Guerrero, Josep M.

    2017-01-01

    A multiple time-scale optimization scheduling including day ahead and short time for an islanded microgrid is presented. In this paper, the microgrid under study includes photovoltaics (PV), wind turbine (WT), diesel generator (DG), batteries, and shiftable loads. The study considers the maximum...... efficiency operation area for the diesel engine and the cost of the battery charge/discharge cycle losses. The day-ahead generation scheduling takes into account the minimum operational cost and the maximum load satisfaction as the objective function. Short-term optimal dispatch is based on minimizing...

  16. Dose and time dependent ototoxicity of aspartame in rats.

    Science.gov (United States)

    Ozturan, Orhan; Dogan, Remzi; Tugrul, Selahattin; Gedik, Ozge; Sjostrand, Alev Pektas; Yildirim, Yavuz Selim

    2017-04-01

    Low-dose administration of Aspartame (Ap) did not produce a significant ototoxic effect at the end of the 6th month. However, duration of the ototoxic effect is shortened and severity of the effect is increased as dose and duration of Ap administration is increased. While Ap toxicity has been studied in short- and long-term studies, its effects on hearing have not been investigated. This study was conducted to evaluate the effects of long-term consumption of Ap administered in various doses on hearing status of rats. The study included 54 female Wistar Albino rats. Ap was given for 6 months to the rats. The groups were assigned according to levels of Ap dosage. DPOAE and ABR tests were utilized for serial hearing evaluations. Serial hearing measurement times were designed as baseline, 1st week, 2nd week, 1st, 2nd, 3rd, and 6th months. While audiological parameters deteriorated with 100 mg/kg/day dose after the 3rd month, ABR thresholds were elevated and DPOAE values were significantly decreased in 500 mg/kg/day and 1000 mg/kg/day applications after the 2nd month. In 2000 mg/kg/day and 4000 mg/kg/day applications, deteriorations in audiological parameters were detected as early as the first and second months; respectively.

  17. Moderate Hypofractionated Protracted Radiation Therapy and Dose Escalation for Prostate Cancer: Do Dose and Overall Treatment Time Matter?

    Energy Technology Data Exchange (ETDEWEB)

    Kountouri, Melpomeni; Zilli, Thomas; Rouzaud, Michel; Dubouloz, Angèle [Department of Radiation Oncology, Geneva University Hospital, Geneva (Switzerland); Linero, Dolors; Escudé, Lluís; Jorcano, Sandra [Radiation Oncology, Teknon Oncologic Institute, Barcelona (Spain); Miralbell, Raymond, E-mail: Raymond.Miralbell@hcuge.ch [Department of Radiation Oncology, Geneva University Hospital, Geneva (Switzerland); Radiation Oncology, Teknon Oncologic Institute, Barcelona (Spain)

    2016-02-01

    Purpose: This was a retrospective study of 2 sequential dose escalation regimens of twice-weekly 4 Gy/fractions hypofractionated intensity modulated radiation therapy (IMRT): 56 Gy and 60 Gy delivered within a protracted overall treatment time (OTT) of 6.5 and 7 weeks, respectively. Methods and Materials: 163 prostate cancer patients with cT1c-T3a disease and nodal involvement risk ≤20% (Roach index) were treated twice weekly to the prostate ± seminal vesicles with 2 sequential dose-escalated IMRT schedules: 56 Gy (14 × 4 Gy, n=81) from 2003 to 2007 and 60 Gy (15 × 4 Gy, n=82) from 2006 to 2010. Patient repositioning was made with bone matching on portal images. Gastrointestinal (GI) and genitourinary (GU) toxicities were scored according to the Common Terminology Criteria for Adverse Events version 3.0 grading scale. Results: There were no significant differences regarding the acute GU and GI toxicities in the 2 dose groups. The median follow-up times were 80.2 months (range, 4.5-121 months) and 56.5 months (range, 1.4-91.2 months) for patients treated to 56 and 60 Gy, respectively. The 5-year grade ≥2 late GU toxicity-free survivals with 56 Gy and 60 Gy were 96 ± 2.3% and 78.2 ± 5.1% (P=.001), respectively. The 5-year grade ≥2 late GI toxicity-free survivals with 56 Gy and 60 Gy were 98.6 ± 1.3% and 85.1 ± 4.5% (P=.005), respectively. Patients treated with 56 Gy showed a 5-year biochemical progression-free survival (bPFS) of 80.8 ± 4.7%, worse than patients treated with 60 Gy (93.2 ± 3.9%, P=.007). A trend for a better 5-year distant metastasis-free survival was observed among patients treated in the high-dose group (95.3 ± 2.7% vs 100%, P=.073, respectively). On multivariate analysis, only the 60-Gy group predicted for a better bPFS (P=.016, hazard ratio = 4.58). Conclusions: A single 4-Gy additional fraction in patients treated with a hypofractionated protracted IMRT schedule of 14 × 4 Gy resulted in

  18. Processing time tolerance-based ACO algorithm for solving job-shop scheduling problem

    Science.gov (United States)

    Luo, Yabo; Waden, Yongo P.

    2017-06-01

    Ordinarily, Job Shop Scheduling Problem (JSSP) is known as NP-hard problem which has uncertainty and complexity that cannot be handled by a linear method. Thus, currently studies on JSSP are concentrated mainly on applying different methods of improving the heuristics for optimizing the JSSP. However, there still exist many problems for efficient optimization in the JSSP, namely, low efficiency and poor reliability, which can easily trap the optimization process of JSSP into local optima. Therefore, to solve this problem, a study on Ant Colony Optimization (ACO) algorithm combined with constraint handling tactics is carried out in this paper. Further, the problem is subdivided into three parts: (1) Analysis of processing time tolerance-based constraint features in the JSSP which is performed by the constraint satisfying model; (2) Satisfying the constraints by considering the consistency technology and the constraint spreading algorithm in order to improve the performance of ACO algorithm. Hence, the JSSP model based on the improved ACO algorithm is constructed; (3) The effectiveness of the proposed method based on reliability and efficiency is shown through comparative experiments which are performed on benchmark problems. Consequently, the results obtained by the proposed method are better, and the applied technique can be used in optimizing JSSP.

  19. Optimizing Fire Department Operations Through Work Schedule Analysis, Alternative Staffing, and Nonproductive Time Reduction

    Science.gov (United States)

    2014-09-01

    and disadvantages ; for example, although the majority of fire departments in the United States abide by the 24/48- schedule, this schedule also leads...costs. The local bargaining group also falls into these criteria. The local bargaining unit must be agreeable to the policy changes. They cannot... agreeable to the local bargaining group particularly when it is addressed in an article of the current bargaining agreement. Additionally, the local

  20. Real-time-service-based Distributed Scheduling Scheme for IEEE 802.16j Networks

    OpenAIRE

    Kuo-Feng Huang; Shih-Jung Wu

    2013-01-01

    Supporting Quality of Service (QoS) guarantees for diverse multimedia services is the primary concern for IEEE802.16j networks. A scheduling scheme that satisfies the QoS requirements has become more important for wireless communications. We proposed an adaptive nontransparent-based distributed scheduling scheme (ANDS) for IEEE 802.16j networks. ANDS comprises three major components: Priority Assignment, Resource Allocation, Preserved Bandwidth Adjustment. Different service-type connections p...

  1. Towards real-time photon Monte Carlo dose calculation in the cloud

    Science.gov (United States)

    Ziegenhein, Peter; Kozin, Igor N.; Kamerling, Cornelis Ph; Oelfke, Uwe

    2017-06-01

    Near real-time application of Monte Carlo (MC) dose calculation in clinic and research is hindered by the long computational runtimes of established software. Currently, fast MC software solutions are available utilising accelerators such as graphical processing units (GPUs) or clusters based on central processing units (CPUs). Both platforms are expensive in terms of purchase costs and maintenance and, in case of the GPU, provide only limited scalability. In this work we propose a cloud-based MC solution, which offers high scalability of accurate photon dose calculations. The MC simulations run on a private virtual supercomputer that is formed in the cloud. Computational resources can be provisioned dynamically at low cost without upfront investment in expensive hardware. A client-server software solution has been developed which controls the simulations and transports data to and from the cloud efficiently and securely. The client application integrates seamlessly into a treatment planning system. It runs the MC simulation workflow automatically and securely exchanges simulation data with the server side application that controls the virtual supercomputer. Advanced encryption standards were used to add an additional security layer, which encrypts and decrypts patient data on-the-fly at the processor register level. We could show that our cloud-based MC framework enables near real-time dose computation. It delivers excellent linear scaling for high-resolution datasets with absolute runtimes of 1.1 seconds to 10.9 seconds for simulating a clinical prostate and liver case up to 1% statistical uncertainty. The computation runtimes include the transportation of data to and from the cloud as well as process scheduling and synchronisation overhead. Cloud-based MC simulations offer a fast, affordable and easily accessible alternative for near real-time accurate dose calculations to currently used GPU or cluster solutions.

  2. A comparison of mixed-integer linear programming models for workforce scheduling with position-dependent processing times

    Science.gov (United States)

    Moreno-Camacho, Carlos A.; Montoya-Torres, Jairo R.; Vélez-Gallego, Mario C.

    2018-06-01

    Only a few studies in the available scientific literature address the problem of having a group of workers that do not share identical levels of productivity during the planning horizon. This study considers a workforce scheduling problem in which the actual processing time is a function of the scheduling sequence to represent the decline in workers' performance, evaluating two classical performance measures separately: makespan and maximum tardiness. Several mathematical models are compared with each other to highlight the advantages of each approach. The mathematical models are tested with randomly generated instances available from a public e-library.

  3. Physical Activity and Sedentary Time among Young Children in Full-Day Kindergarten: Comparing Traditional and Balanced Day Schedules

    Science.gov (United States)

    Vanderloo, Leigh M.; Tucker, Patricia

    2017-01-01

    Objective: To compare physical activity and sedentary time among young children whose schools adhere to traditional (i.e. three outdoor playtimes = 70 minutes) versus balanced day (i.e. two outdoor playtimes = ~55 minutes) schedules in Ontario full-day kindergarten classrooms. Design: The project was part of a larger, 2-year cross-sectional study.…

  4. Synthesis of Flexible Fault-Tolerant Schedules with Preemption for Mixed Soft and Hard Real-Time Systems

    DEFF Research Database (Denmark)

    Izosimov, Viacheslav; Pop, Paul; Eles, Petru

    2008-01-01

    In this paper we present an approach for scheduling with preemption for fault-tolerant embedded systems composed of soft and hard real-time processes. We are interested to maximize the overall utility for average, most likely to happen, scenarios and to guarantee the deadlines for the hard...

  5. Reevaluation of time spent indoors used for exposure dose assessment

    International Nuclear Information System (INIS)

    Hirose, Katsumi; Fujimoto, Kenzo

    2016-01-01

    A time spent indoors of sixteen hours per day (indoor occupancy factor: 0.67) has been used to assess the radiation dose of residents who spend daily life in the area contaminated due to the nuclear accident in Japan. However, much longer time is considered to be spent indoors for recent modern life. United Nations Scientific Committee on the Effects of Atomic Radiation (UNSCEAR) has been used an indoor occupancy factor of 0.8 since 1977 and a few reports suggested much higher indoor occupancy factors. Therefore it is important to reevaluate the indoor occupancy factor using current available survey data in Japan, such as 'NHK 2010 National Time Use Survey' and 'Survey on Time Use and Leisure Activities' of Statistics Bureau with certain assumption of time spent indoors in each daily activity. The total time spent indoors in a day is calculated to be 20.2 hours and its indoor occupancy factor is 0.84. Much lower indoor occupancy factors were derived from the survey data by Statistics Bureau for 10 to 14 and 15 to 19 years old groups and farmers who spend most of their time outdoors although present estimated indoor occupancy factor of 0.84 is still lower than those found in some of the relevant reports. A rounded indoor occupancy factor of 0.80 might be the appropriate conservative reference value to be used for the dose estimation of people who live in radioactively contaminated areas and for other relevant purposes of exposure assessment, taken into consideration the present results and values reported in United States Environmental Protection Agency (US EPA) and UNSCEAR. (author)

  6. Multi-Agent Based Beam Search for Real-Time Production Scheduling and Control Method, Software and Industrial Application

    CERN Document Server

    Kang, Shu Gang

    2013-01-01

    The Multi-Agent Based Beam Search (MABBS) method systematically integrates four major requirements of manufacturing production - representation capability, solution quality, computation efficiency, and implementation difficulty - within a unified framework to deal with the many challenges of complex real-world production planning and scheduling problems. Multi-agent Based Beam Search for Real-time Production Scheduling and Control introduces this method, together with its software implementation and industrial applications.  This book connects academic research with industrial practice, and develops a practical solution to production planning and scheduling problems. To simplify implementation, a reusable software platform is developed to build the MABBS method into a generic computation engine.  This engine is integrated with a script language, called the Embedded Extensible Application Script Language (EXASL), to provide a flexible and straightforward approach to representing complex real-world problems. ...

  7. Time-dose considerations in the treatment of anal cancer

    International Nuclear Information System (INIS)

    Constantinou, Eugene C.; Daly, William; Fung, Claire Y.; Willett, Christopher G.; Kaufman, Donald S.; DeLaney, Thomas F.

    1997-01-01

    Purpose: To analyze the impact of patient and treatment parameters in concurrent chemoradiation treatment for anal carcinoma. Methods and Materials: Retrospective review of 50 MO anal cancer patients treated from 1984-1994. Most patients received concurrent 5-FU, mitomycin, and radiation. Local control and disease-free/overall survival were determined and analyzed according to patient and treatment parameters. Results: With 43 month median follow-up, projected overall survival is 66% at 5 and 8 years. Disease-free survival is 67% at 5 years and 59% at 8 years. Local control is 70% at 5 and 8 years. Doses of ≥54 Gy are associated with improved 5-year survival (84 vs. 47%, p = 0.02), disease-free survival (74 v. 56%, p = 0.09), and local control (77 vs. 61%, p = 0.04). Although local control, disease-free survival, and overall survival were improved in patients whose overall treatment time was <40 days, this was not statistically significant. Outcome in the four patients with pretreatment hemoglobin (Hgb) <10 appeared worse with 3-year overall survival 50 vs. 68% (p = 0.07), disease-free survival 0 vs. 67% (p = 0.11), and local control 0 vs. 74% (p = 0.05). Projected 5-year overall survival, relapse-free survival, and local control in 4 HIV (+) patients is 0, 75, and 75%. Multivariate analysis reveals that dose (p 0.02) and Hgb (p = 0.05) independently affect local control, dose (p = 0.02) affects disease-free survival, and dose (p = 0.01), Hgb (p = 0.03), T-stage (p = 0.03), and HIV-status (0.07) independently influence overall survival. Conclusion: Radiation doses of ≥54 Gy are associated with significantly improved survival and local control in anal cancer patients treated with chemoradiation. Overall treatment times of less than 40 days are associated with a trend towards improved outcome, but this is not significant. Pretreatment hemoglobin <10 is associated with worse treatment outcome. Survival of HIV (+) patient is poor, but the majority of such patients

  8. OL-DEC-MDP Model for Multiagent Online Scheduling with a Time-Dependent Probability of Success

    Directory of Open Access Journals (Sweden)

    Cheng Zhu

    2014-01-01

    Full Text Available Focusing on the on-line multiagent scheduling problem, this paper considers the time-dependent probability of success and processing duration and proposes an OL-DEC-MDP (opportunity loss-decentralized Markov Decision Processes model to include opportunity loss into scheduling decision to improve overall performance. The success probability of job processing as well as the process duration is dependent on the time at which the processing is started. The probability of completing the assigned job by an agent would be higher when the process is started earlier, but the opportunity loss could also be high due to the longer engaging duration. As a result, OL-DEC-MDP model introduces a reward function considering the opportunity loss, which is estimated based on the prediction of the upcoming jobs by a sampling method on the job arrival. Heuristic strategies are introduced in computing the best starting time for an incoming job by each agent, and an incoming job will always be scheduled to the agent with the highest reward among all agents with their best starting policies. The simulation experiments show that the OL-DEC-MDP model will improve the overall scheduling performance compared with models not considering opportunity loss in heavy-loading environment.

  9. A Hybrid Metaheuristic Approach for Minimizing the Total Flow Time in A Flow Shop Sequence Dependent Group Scheduling Problem

    Directory of Open Access Journals (Sweden)

    Antonio Costa

    2014-07-01

    Full Text Available Production processes in Cellular Manufacturing Systems (CMS often involve groups of parts sharing the same technological requirements in terms of tooling and setup. The issue of scheduling such parts through a flow-shop production layout is known as the Flow-Shop Group Scheduling (FSGS problem or, whether setup times are sequence-dependent, the Flow-Shop Sequence-Dependent Group Scheduling (FSDGS problem. This paper addresses the FSDGS issue, proposing a hybrid metaheuristic procedure integrating features from Genetic Algorithms (GAs and Biased Random Sampling (BRS search techniques with the aim of minimizing the total flow time, i.e., the sum of completion times of all jobs. A well-known benchmark of test cases, entailing problems with two, three, and six machines, is employed for both tuning the relevant parameters of the developed procedure and assessing its performances against two metaheuristic algorithms recently presented by literature. The obtained results and a properly arranged ANOVA analysis highlight the superiority of the proposed approach in tackling the scheduling problem under investigation.

  10. Enhanced Discrete-Time Scheduler Engine for MBMS E-UMTS System Level Simulator

    DEFF Research Database (Denmark)

    Pratas, Nuno; Rodrigues, António

    2007-01-01

    In this paper the design of an E-UMTS system level simulator developed for the study of optimization methods for the MBMS is presented. The simulator uses a discrete event based philosophy, which captures the dynamic behavior of the Radio Network System. This dynamic behavior includes the user...... mobility, radio interfaces and the Radio Access Network. Its given emphasis on the enhancements developed for the simulator core, the Event Scheduler Engine. Two implementations for the Event Scheduler Engine are proposed, one optimized for single core processors and other for multi-core ones....

  11. Dosing of Appropriate Antibiotics and Time to Administration of First Doses in the Pediatric Emergency Department.

    Science.gov (United States)

    Bailey, Abby M; Stephan, Maria; Weant, Kyle A; Justice, Stephanie Baker

    2015-01-01

    Emergency department (ED) providers are faced with the challenge of diagnosing and treating patients in a timely fashion given many obstacles including limited patient information, complex disease states, and high patient turnover. Time delays in administration or selection of appropriate drug therapies have been associated with negative outcomes in severe infections. This study was conducted to assess the impact of an emergency medicine pharmacist (EPh) on the selection of appropriate antibiotics and the timeliness of administration in pediatric patients in the ED. Patients younger than 18 years were evaluated who were admitted through the ED and received 1 dose of intravenous antibiotic for the following conditions: community-acquired pneumonia, complicated skin and soft tissue infection (SSTI), meningitis, and sepsis. To evaluate the impact of the presence of an EPh, patients with orders placed during the EPh's hours of 1 pm and 11 pm were compared to those with an order placed between 11 pm and 1 pm. A total of 142 patients were included in the study. Patients seen during EPh hours received an appropriate first antibiotic 93.4% of the time (p = 0.157) and second antibiotic 96.8% of the time (p = 0.023). Time from order to verification was significantly shorter for the first 2 antimicrobials in the EPh group (10.5 minutes [p = 0.003] and 11.4 minutes [p = 0.047], respectively). The days from discharge to return to readmission to the ED were also significantly different (17.5 days vs. 62.4 days, p = 0.008). The available data suggest that patients are more likely to receive appropriate doses of antimicrobials, and in a more timely fashion, whenever the EPh is present. Areas for future investigation include whether the presence of EPhs at the bedside has the potential to impact areas of patient care, including readmission rates, drug costs, and medication errors.

  12. The time factor in dose-effect relationships

    International Nuclear Information System (INIS)

    Jones, H.B.; Grendon, A.; White, M.R.; California Univ., Berkeley

    1976-01-01

    The assumption that carcinogenic risk is proportional to dose fails to consider that probable time of actual cancer incidence. The time lag between exposure and carcinogenic effect for radiation and chemical agents varies as Dosesup(-1/n), with napproximately3. A model is offered explaining that concentration of initially altered cells depends on dose, whereas their chance for development into tumours on their proximity, which varies as Dsup(-1/3). Because of biological variability, n has a range of values. The model implies that tumours resulting from a single exposure should be closely distributed in time, producing a pulse of cases and subsequently being essentially without effect. Testing of the Dsup(-1/3) rule was extended and its model, by further refinement of methods, applied to radiogenic leukaemia risk and to the effect of urethan in inducing lung tumours in mice with and without radiation exposure as a possible cocarcinogen. Radiation did not affect the tumour yield from urethan in mice. Radiogenic leukaemia and lung tumours induced by urethan both occur in proportion to exposure, but the time of their occurrence is limited to a short interval in relation to life span. Similarly, in murine or in human radiogenic leukaemia, leukaemia risk occurs in proportion to exposure, but the time of occurrences is limited to a short interval in relation to life span. In both sets of observations, as well as in other test systems of carcinogenesis, the peak of occurrence or the mean latent period is roughly inversely related to Dsup(-1/3). Applied to lung tumours and leukaemia, the spread of cases about the peak incidence was found to be typically less than a fifth of the life span. Exposure risks do not continue to act over life span. Neoplastic disease risk from carcinogens levels too low to be tested experimentally, theoretically usually lies beyond the life span. The social and economic consequences of a theoretically calculated number of deaths due to those

  13. Dose, time and volume effects in interstitial radiation therapy

    International Nuclear Information System (INIS)

    Burgers, J.M.V.

    1982-01-01

    This study presents the main features and uncertainties of interstitial therapy and was undertaken to examine whether differences could be found in different clinical situations treated by interstitial implants with removable sources, that were not simply related to dose. In chapter 2, dating from 1978, continuous low dose rate irradiation is discussed from the radiobiological point of view together with some points related to variation in dose rate. A benefit of continuous low dose rate irradiation could be surmised in a few situations with special cell-kinetic properties. The problem of dose specification, the sharp dose gradient and other volume characteristics are discussed in chapter 3. Possible adjustments to variations in dose rate are discussed in chapter 4. The clinical material is reviewed in chapter 5, including aspects of dose specification, dose fall-off and variation in dose rate. The general discussion and conclusions are given in chapter 6. (Auth.)

  14. Just-in-time patient scheduling in an eye care clinic

    NARCIS (Netherlands)

    Blake, J.; Campbell, Matthew; Vanberkel, Peter T.

    2007-01-01

    The IWK’s division of Ophthalmology currently provides clinical service to over 8000 patients per year. Eye Care Centre patients were experiencing long waits between registration and their ophthalmologist appointment. This paper details the development of a patient scheduling methodology that

  15. Negotiating on location, timing, duration, and participant in agent-mediated joint activity-travel scheduling

    NARCIS (Netherlands)

    Ma, Huiye; Ronald, N.A.; Arentze, T.A.; Timmermans, H.J.P.

    2013-01-01

    Agent-based simulation has become an important modeling approach in activity-travel analysis. Social activities account for a large amount of travel and have an important effect on activity-travel scheduling. Participants in joint activities usually have various options regarding location,

  16. A real-time Excel-based scheduling solution for nursing staff reallocation.

    Science.gov (United States)

    Tuominen, Outi Anneli; Lundgren-Laine, Heljä; Kauppila, Wiveka; Hupli, Maija; Salanterä, Sanna

    2016-09-30

    Aim This article describes the development and testing of an Excel-based scheduling solution for the flexible allocation and reallocation of nurses to cover sudden, unplanned absences among permanent nursing staff. Method A quasi-experimental, one group, pre- and post-test study design was used ( Box 1 ) with total sampling. Participants (n=17) were selected purposefully by including all ward managers (n=8) and assistant ward managers (n=9) from one university hospital department. The number of sudden absences among the nursing staff was identified during two 4-week data collection periods (pre- and post-test). Results During the use of the paper-based scheduling system, 121 absences were identified; during the use of the Excel-based system, 106 were identified. The main reasons for the use of flexible 'floating' nurses were sick leave (n=66) and workload (n=31). Other reasons (n=29) included patient transfer to another hospital, scheduling errors and the start or end of employment. Conclusion The Excel-based scheduling solution offered better support in obtaining substitute labour inside the organisation, with smaller employment costs. It also reduced the number of tasks ward managers had to carry out during the process of reallocating staff.

  17. Real-time Scheduling for GPUS with Applications in Advanced Automotive Systems

    Science.gov (United States)

    2015-01-01

    129 3.7 Architecture of GPU tasklet scheduling infrastructure ...throughput. This disparity is even greater when we consider mobile CPUs, such as those designed by ARM. For instance, the ARM Cortex-A15 series processor as...stub library that replaces the GPGPU runtime within each virtual machine. The stub library communicates API calls to a GPGPU backend user-space daemon

  18. Resource-Constrained Optimal Scheduling of Synchronous Dataflow Graphs via Timed Automata

    NARCIS (Netherlands)

    Ahmad, W.; de Groote, Robert; Holzenspies, P.K.F.; Stoelinga, Mariëlle Ida Antoinette; van de Pol, Jan Cornelis

    Synchronous dataflow (SDF) graphs are a widely used formalism for modelling, analysing and realising streaming applications, both on a single processor and in a multiprocessing context. Efficient schedules are essential to obtain maximal throughput under the constraint of available resources. This

  19. School Schedules Affect Sleep Timing in Children and Contribute to Partial Sleep Deprivation

    Science.gov (United States)

    Anacleto, Tâmile Stella; Adamowicz, Taísa; Simões da Costa Pinto, Laura; Louzada, Fernando Mazzilli

    2014-01-01

    Although the environmental light/dark cycle is the main zeitgeber for the human species, the social cues seem to be important in the synchronization of circadian rhythms. In Brazil, the existence of two school schedules--one with only morning classes (MG) and other with only afternoon classes (AG)--allows the investigation of the effect of school…

  20. Scheduling with Learning Effects and/or Time-Dependent Processing Times to Minimize the Weighted Number of Tardy Jobs on a Single Machine

    Directory of Open Access Journals (Sweden)

    Jianbo Qian

    2013-01-01

    Full Text Available We consider single machine scheduling problems with learning/deterioration effects and time-dependent processing times, with due date assignment consideration, and our objective is to minimize the weighted number of tardy jobs. By reducing all versions of the problem to an assignment problem, we solve them in O(n4 time. For some important special cases, the time complexity can be improved to be O(n2 using dynamic programming techniques.

  1. Influence of titration schedule and maintenance dose on the tolerability of adjunctive eslicarbazepine acetate: An integrated analysis of three randomized placebo-controlled trials.

    Science.gov (United States)

    Krauss, Gregory; Biton, Victor; Harvey, Jay H; Elger, Christian; Trinka, Eugen; Soares da Silva, Patrício; Gama, Helena; Cheng, Hailong; Grinnell, Todd; Blum, David

    2018-01-01

    To examine the influence of titration schedule and maintenance dose on the incidence and type of treatment-emergent adverse events (TEAEs) associated with adjunctive eslicarbazepine acetate (ESL). Data from three randomized, double-blind, placebo-controlled trials were analyzed. Patients with refractory partial-onset seizures were randomized to maintenance doses of ESL 400, 800, or 1200mg QD (dosing was initiated at 400 or 800mg QD) or placebo. The incidence of TEAEs was analyzed during the double-blind period (2-week titration phase; 12-week maintenance phase), according to the randomized maintenance dose and the titration schedule. 1447 patients were included in the analysis. During the first week of treatment, 62% of patients taking ESL 800mg QD had ≥1 TEAE, vs 35% of those taking 400mg QD and 32% of the placebo group; dizziness, somnolence, nausea, and headache were numerically more frequent in patients taking ESL 800mg than those taking ESL 400mg QD. During the double-blind period, the incidences of common TEAEs were lower in patients who initiated ESL at 400mg vs 800mg QD. For the 800 and 1200mg QD maintenance doses, rates of TEAEs leading to discontinuation were lower in patients who began treatment with 400mg than in those who began taking ESL 800mg QD. Initiation of ESL at 800mg QD is feasible. However, initiating treatment with ESL 400mg QD for 1 or 2 weeks is recommended, being associated with a lower incidence of TEAEs, and related discontinuations. For some patients, treatment may be initiated at 800mg QD, if the need for more immediate seizure reduction outweighs concerns about increased risk of adverse reactions during initiation. Copyright © 2017 The Authors. Published by Elsevier B.V. All rights reserved.

  2. Optimal Real-Time Scheduling for Hybrid Energy Storage Systems and Wind Farms Based on Model Predictive Control

    Directory of Open Access Journals (Sweden)

    Meng Xiong

    2015-08-01

    Full Text Available Energy storage devices are expected to be more frequently implemented in wind farms in near future. In this paper, both pumped hydro and fly wheel storage systems are used to assist a wind farm to smooth the power fluctuations. Due to the significant difference in the response speeds of the two storages types, the wind farm coordination with two types of energy storage is a problem. This paper presents two methods for the coordination problem: a two-level hierarchical model predictive control (MPC method and a single-level MPC method. In the single-level MPC method, only one MPC controller coordinates the wind farm and the two storage systems to follow the grid scheduling. Alternatively, in the two-level MPC method, two MPC controllers are used to coordinate the wind farm and the two storage systems. The structure of two level MPC consists of outer level and inner level MPC. They run alternatively to perform real-time scheduling and then stop, thus obtaining long-term scheduling results and sending some results to the inner level as input. The single-level MPC method performs both long- and short-term scheduling tasks in each interval. The simulation results show that the methods proposed can improve the utilization of wind power and reduce wind power spillage. In addition, the single-level MPC and the two-level MPC are not interchangeable. The single-level MPC has the advantage of following the grid schedule while the two-level MPC can reduce the optimization time by 60%.

  3. Modelling altered fractionation schedules

    International Nuclear Information System (INIS)

    Fowler, J.F.

    1993-01-01

    The author discusses the conflicting requirements of hyperfractionation and accelerated fractionation used in radiotherapy, and the development of computer modelling to predict how to obtain an optimum of tumour cell kill without exceeding normal-tissue tolerance. The present trend is to shorten hyperfractionated schedules from 6 or 7 weeks to give overall times of 4 or 5 weeks as in new schedules by Herskovic et al (1992) and Harari (1992). Very high doses are given, much higher than can be given when ultrashort schedules such as CHART (12 days) are used. Computer modelling has suggested that optimum overall times, to yield maximum cell kill in tumours ((α/β = 10 Gy) for a constant level of late complications (α/β = 3 Gy) would be X or X-1 weeks, where X is the doubling time of the tumour cells in days (Fowler 1990). For median doubling times of about 5 days, overall times of 4 or 5 weeks should be ideal. (U.K.)

  4. The Effect of Biologically Effective Dose and Radiation Treatment Schedule on Overall Survival in Stage I Non-Small Cell Lung Cancer Patients Treated With Stereotactic Body Radiation Therapy

    Energy Technology Data Exchange (ETDEWEB)

    Stahl, John M. [Department of Therapeutic Radiology, Yale School of Medicine, New Haven, Connecticut (United States); Ross, Rudi [21st Century Oncology, Fort Myers, Florida (United States); Harder, Eileen M.; Mancini, Brandon R. [Department of Therapeutic Radiology, Yale School of Medicine, New Haven, Connecticut (United States); Soulos, Pamela R. [Cancer Outcomes, Public Policy and Effectiveness Research (COPPER) Center, Yale School of Medicine, New Haven, Connecticut (United States); Finkelstein, Steven E.; Shafman, Timothy D.; Dosoretz, Arie P. [21st Century Oncology, Fort Myers, Florida (United States); Evans, Suzanne B.; Husain, Zain A.; Yu, James B. [Department of Therapeutic Radiology, Yale School of Medicine, New Haven, Connecticut (United States); Gross, Cary P. [Cancer Outcomes, Public Policy and Effectiveness Research (COPPER) Center, Yale School of Medicine, New Haven, Connecticut (United States); Decker, Roy H., E-mail: roy.decker@yale.edu [Department of Therapeutic Radiology, Yale School of Medicine, New Haven, Connecticut (United States)

    2016-12-01

    Purpose: To determine the effect of biologically effective dose (BED{sub 10}) and radiation treatment schedule on overall survival (OS) in patients with early-stage non-small cell lung cancer (NSCLC) undergoing stereotactic body radiation therapy (SBRT). Methods and Materials: Using data from 65 treatment centers in the United States, we retrospectively reviewed the records of T1-2 N0 NSCLC patients undergoing SBRT alone from 2006 to 2014. Biologically relevant covariates, including dose per fraction, number of fractions, and time between fractions, were used to quantify BED{sub 10} and radiation treatment schedule. The linear-quadratic equation was used to calculate BED{sub 10} and to generate a dichotomous dose variable of <105 Gy versus ≥105 Gy BED{sub 10}. The primary outcome was OS. We used the Kaplan-Meier method, the log–rank test, and Cox proportional hazards regression with propensity score matching to determine whether prescription BED{sub 10} was associated with OS. Results: We identified 747 patients who met inclusion criteria. The median BED{sub 10} was 132 Gy, and 59 (7.7%) had consecutive-day fractions. Median follow-up was 41 months, and 452 patients (60.5%) had died by the conclusion of the study. The 581 patients receiving ≥105 Gy BED{sub 10} had a median survival of 28 months, whereas the 166 patients receiving <105 Gy BED{sub 10} had a median survival of 22 months (log–rank, P=.01). Radiation treatment schedule was not a significant predictor of OS on univariable analysis. After adjusting for T stage, sex, tumor histology, and Eastern Cooperative Oncology Group performance status, BED{sub 10} ≥105 Gy versus <105 Gy remained significantly associated with improved OS (hazard ratio 0.78, 95% confidence interval 0.62-0.98, P=.03). Propensity score matching on imbalanced variables within high- and low-dose cohorts confirmed a survival benefit with higher prescription dose. Conclusions: We found that dose escalation to 105 Gy BED

  5. Outsourcing and scheduling for a two-machine flow shop with release times

    Science.gov (United States)

    Ahmadizar, Fardin; Amiri, Zeinab

    2018-03-01

    This article addresses a two-machine flow shop scheduling problem where jobs are released intermittently and outsourcing is allowed. The first operations of outsourced jobs are processed by the first subcontractor, they are transported in batches to the second subcontractor for processing their second operations, and finally they are transported back to the manufacturer. The objective is to select a subset of jobs to be outsourced, to schedule both the in-house and the outsourced jobs, and to determine a transportation plan for the outsourced jobs so as to minimize the sum of the makespan and the outsourcing and transportation costs. Two mathematical models of the problem and several necessary optimality conditions are presented. A solution approach is then proposed by incorporating the dominance properties with an ant colony algorithm. Finally, computational experiments are conducted to evaluate the performance of the models and solution approach.

  6. Load Balancing Integrated Least Slack Time-Based Appliance Scheduling for Smart Home Energy Management

    OpenAIRE

    Bhagya Nathali Silva; Murad Khan; Kijun Han

    2018-01-01

    The emergence of smart devices and smart appliances has highly favored the realization of the smart home concept. Modern smart home systems handle a wide range of user requirements. Energy management and energy conservation are in the spotlight when deploying sophisticated smart homes. However, the performance of energy management systems is highly influenced by user behaviors and adopted energy management approaches. Appliance scheduling is widely accepted as an effective mechanism to manage...

  7. Energy Efficient Scheduling of Real Time Signal Processing Applications through Combined DVFS and DPM

    OpenAIRE

    Nogues , Erwan; Pelcat , Maxime; Menard , Daniel; Mercat , Alexandre

    2016-01-01

    International audience; This paper proposes a framework to design energy efficient signal processing systems. The energy efficiency is provided by combining Dynamic Frequency and Voltage Scaling (DVFS) and Dynamic Power Management (DPM). The framework is based on Synchronous Dataflow (SDF) modeling of signal processing applications. A transformation to a single rate form is performed to expose the application parallelism. An automated scheduling is then performed, minimizing the constraint of...

  8. Online scheduling of jobs with fixed start times on related machines

    Czech Academy of Sciences Publication Activity Database

    Epstein, L.; Jeż, Łukasz; Sgall, J.; van Stee, R.

    2016-01-01

    Roč. 74, č. 1 (2016), s. 156-176 ISSN 0178-4617 R&D Projects: GA AV ČR IAA100190902; GA ČR GBP202/12/G061 Institutional support: RVO:67985840 Keywords : online scheduling * online algorithms * related machines Subject RIV: BA - General Mathematics Impact factor: 0.735, year: 2016 http://link.springer.com/article/10.1007%2Fs00453-014-9940-2

  9. "Time sequential high dose of Cytarabine in acute myelocytic leukemia "

    Directory of Open Access Journals (Sweden)

    Ghavamzadeh A

    2003-05-01

    Full Text Available Given preliminary evidence of timed, sequential chemotherapy of high dose cytosine arabinoside the current study was initiated to assess the side effects and efficacy of this regimen in patients with newly acute myelocytic leukemia (AML. Nineteen adults who referred to Hematology-Oncology and Bone Marrow Transplantation (BMT research center of Tehran University of Medical Sciences were enrolled in a trial from Aug 1999 to Nov 2000. All patients had a Karnofski classification above 60%. At this time induction therapy consisted of daunorubicin or idarubicin given at a dose of 60 mg/m² and 12 mg/m² IV respectively on days 1-3, and cytarabine (Ara-C 100 mg/m² intravenously by continuous infusion on days 1-7, followed by Ara-C 1000 mg/m² given on day 8-10 every 12 hours by IV infusion. Consolidation therapy started after 35th day. Of 19 fully evaluable patients, 10 patients achieved a complete remission, whereas 36.6% patients succumbed to death due to regeneration failure. The clinical data show that the overall survival rate from diagnosis 55.5% (95% CI, 30.8-78.5 at 6 months for the entire cohort of the patients. Disease free survival is also 50% (95% CI, 26-74. Mean duration of death due to treatment was 20 days (range 17-29 after beginning the regimen. Presenting WBC counts, French-American-British (FAB classification, sex and age were not useful prognostic variables. Fever, diarrhea, nausea and vomiting and GI hemorrhage were seen in 19, 6, 4, 7 patients respectively. It seems the 3+7+3 regimen is a promising approach for the AML patients regarding to high complete remission rate, but more supportive care should be considered. Furthermore any, benefit in long-term outcome can’t be determined regardless to the choice of post remission therapy (e.g., GCSF, appropriate antibiotics and etc.

  10. Performance Analysis of Stop-Skipping Scheduling Plans in Rail Transit under Time-Dependent Demand.

    Science.gov (United States)

    Cao, Zhichao; Yuan, Zhenzhou; Zhang, Silin

    2016-07-13

    Stop-skipping is a key method for alleviating congestion in rail transit, where schedules are sometimes difficult to implement. Several mechanisms have been proposed and analyzed in the literature, but very few performance comparisons are available. This study formulated train choice behavior estimation into the model considering passengers' perception. If a passenger's train path can be identified, this information would be useful for improving the stop-skipping schedule service. Multi-performance is a key characteristic of our proposed five stop-skipping schedules, but quantified analysis can be used to illustrate the different effects of well-known deterministic and stochastic forms. Problems in the novel category of forms were justified in the context of a single line rather than transit network. We analyzed four deterministic forms based on the well-known A/B stop-skipping operating strategy. A stochastic form was innovatively modeled as a binary integer programming problem. We present a performance analysis of our proposed model to demonstrate that stop-skipping can feasibly be used to improve the service of passengers and enhance the elasticity of train operations under demand variations along with an explicit parametric discussion.

  11. Performance Analysis of Stop-Skipping Scheduling Plans in Rail Transit under Time-Dependent Demand

    Directory of Open Access Journals (Sweden)

    Zhichao Cao

    2016-07-01

    Full Text Available Stop-skipping is a key method for alleviating congestion in rail transit, where schedules are sometimes difficult to implement. Several mechanisms have been proposed and analyzed in the literature, but very few performance comparisons are available. This study formulated train choice behavior estimation into the model considering passengers’ perception. If a passenger’s train path can be identified, this information would be useful for improving the stop-skipping schedule service. Multi-performance is a key characteristic of our proposed five stop-skipping schedules, but quantified analysis can be used to illustrate the different effects of well-known deterministic and stochastic forms. Problems in the novel category of forms were justified in the context of a single line rather than transit network. We analyzed four deterministic forms based on the well-known A/B stop-skipping operating strategy. A stochastic form was innovatively modeled as a binary integer programming problem. We present a performance analysis of our proposed model to demonstrate that stop-skipping can feasibly be used to improve the service of passengers and enhance the elasticity of train operations under demand variations along with an explicit parametric discussion.

  12. Mature results of a randomized trial comparing two fractionation schedules of high dose rate endoluminal brachytherapy for the treatment of endobronchial tumors

    International Nuclear Information System (INIS)

    Niemoeller, Olivier M; Pöllinger, Barbara; Niyazi, Maximilian; Corradini, Stefanie; Manapov, Farkhad; Belka, Claus; Huber, Rudolf M

    2013-01-01

    To determine the efficacy of high dose rate endobronchial brachytherapy (HDR-BT) for the treatment of centrally located lung tumors, two different fractionation schedules were compared regarding local tumor response, side effects and survival. Mature retrospective results with longer follow-up and more patients were analyzed. Initial results were published by Huber et al. in 1995. 142 patients with advanced, centrally located malignant tumors with preferential endoluminal growth were randomized to receive 4 fractions of 3.8 Gy (time interval: 1 week, n = 60, group I) or 2 fractions of 7.2 Gy (time interval: 3 weeks, n = 82, group II) endobronchial HDR-BT. Age, gender, tumor stage, Karnofsky Performance Score and histology were equally distributed between both groups. Local tumor response with 2 fractions of 7.2 Gy was significantly higher as compared to 4 fractions of 3.8 Gy (median 12 vs. 6 weeks; p ≤ 0.015). Median survival was similar in both groups (19 weeks in the 4 fractions group vs. 18 weeks in the 2 fractions group). Fatal hemoptysis was less frequent following irradiation with 2 × 7.2 Gy than with 4 × 3.8 Gy, although the difference did not achieve statistical significance (12.2% vs. 18.3%, respectively. p = 0,345). Patients presenting with squamous cell carcinoma were at higher risk of bleeding compared to other histology (21.9% vs. 9%, p = 0,035). Multivariate analysis with regard to overall survival, revealed histology (p = 0.02), Karnofsky Performance Score (p < 0.0001) and response to therapy (p < 0.0001) as significant prognostic factors. For patients showing complete response the median survival was 57 weeks, while for patients with progressive disease median survival time was 8 weeks, p < 0.0001. The KPS at the start of the treatment was significantly correlated with survival. Patients presenting with a KPS ≤ 60 at the start had a significantly (p = 0,032) shorter survival time (10 weeks) than patients with a KPS > 60 (29 weeks). Moreover

  13. Delay consequencies in the construction time-schedule of nuclear power plants in relation to its safety and quality

    International Nuclear Information System (INIS)

    Recalde, J.A.

    1991-01-01

    An important delay in the construction time-schedule of a Nuclear Power Plant affects its safety and quality. This mainly occurs as a consequence of four reasons: discontinuity of the personnel working for the project; discontinuities of project suppliers; new safety and quality concepts; long-term storage. This work analyses each of the above reasons so as to foresee countermeasures to garantee the non deterioration of a Nuclear Power Plant. (author)

  14. TH-302, a hypoxia-activated prodrug with broad in vivo preclinical combination therapy efficacy: optimization of dosing regimens and schedules.

    Science.gov (United States)

    Liu, Qian; Sun, Jessica D; Wang, Jingli; Ahluwalia, Dharmendra; Baker, Amanda F; Cranmer, Lee D; Ferraro, Damien; Wang, Yan; Duan, Jian-Xin; Ammons, W Steve; Curd, John G; Matteucci, Mark D; Hart, Charles P

    2012-06-01

    Subregional hypoxia is a common feature of tumors and is recognized as a limiting factor for the success of radiotherapy and chemotherapy. TH-302, a hypoxia-activated prodrug selectively targeting hypoxic regions of solid tumors, delivers a cytotoxic warhead to the tumor, while maintaining relatively low systemic toxicity. The antitumor activity, different dosing sequences, and dosing regimens of TH-302 in combination with commonly used conventional chemotherapeutics were investigated in human tumor xenograft models. Seven chemotherapeutic drugs (docetaxel, cisplatin, pemetrexed, irinotecan, doxorubicin, gemcitabine, and temozolomide) were tested in combination with TH-302 in eleven human xenograft models, including non-small cell lung cancer (NSCLC), colon cancer, prostate cancer, fibrosarcoma, melanoma, and pancreatic cancer. The antitumor activity of docetaxel, cisplatin, pemetrexed, irinotecan, doxorubicin, gemcitabine, and temozolomide was increased when combined with TH-302 in nine out of eleven models tested. Administration of TH-302 2-8 h prior to the other chemotherapeutics yielded superior efficacy versus other sequences tested. Simultaneous administration of TH-302 and chemotherapeutics increased toxicity versus schedules with dosing separations. In a dosing optimization study, TH-302 administered daily at 50 mg/kg intraperitoneally for 5 days per week in the H460 NSCLC model showed the optimal response with minimal toxicity. TH-302 enhances the activity of a wide range of conventional anti-neoplastic agents in a broad panel of in vivo xenograft models. These data highlight in vivo effects of schedule and order of drug administration in regimen efficacy and toxicity and have relevance to the design of human regimens incorporating TH-302.

  15. A randomised, double-blind, placebo-controlled, crossover study to assess the efficacy and safety of three dosing schedules of agalsidase alfa enzyme replacement therapy for Fabry disease.

    Science.gov (United States)

    Hughes, D A; Deegan, P B; Milligan, A; Wright, N; Butler, L H; Jacobs, A; Mehta, A B

    2013-07-01

    Anecdotal reports suggest that the currently approved dosing interval of agalsidase alfa (0.2 mg/kg/2 weeks) for Fabry disease treatment is too long. This randomised, double-blind, placebo-controlled, crossover study investigated three altered dosing intervals. 18 Fabry patients received three agalsidase alfa dosing schedules, each for four weeks (A: 0.2 mg/kg∗2 weeks, B: 0.1 mg/kg/week, C: 0.2 mg/kg/week). Health state, pain levels, sweat volume and latency and plasma and urinary globotriaosylceramide levels were recorded throughout the study. No significant differences were found among the schedules for the primary efficacy outcome of self-assessed health state, or for pain scores. A trend toward increased sweat volume on QSART testing, and reduced urine globotriaosylceramide concentration were seen with treatment schedule C. Agalsidase alfa was safe and well tolerated with all schedules. In conclusion, the primary analyses did not find weekly infusions of agalsidase alfa to be statistically better than the approved dosing schedule however the data indicates that further studies with more patients over a longer period are required to more accurately determine the optimum dose and schedule. Copyright © 2013 Elsevier Inc. All rights reserved.

  16. Quantitative analysis of biological responses to low dose-rate γ-radiation, including dose, irradiation time, and dose-rate

    International Nuclear Information System (INIS)

    Magae, J.; Furukawa, C.; Kawakami, Y.; Hoshi, Y.; Ogata, H.

    2003-01-01

    Full text: Because biological responses to radiation are complex processes dependent on irradiation time as well as total dose, it is necessary to include dose, dose-rate and irradiation time simultaneously to predict the risk of low dose-rate irradiation. In this study, we analyzed quantitative relationship among dose, irradiation time and dose-rate, using chromosomal breakage and proliferation inhibition of human cells. For evaluation of chromosome breakage we assessed micronuclei induced by radiation. U2OS cells, a human osteosarcoma cell line, were exposed to gamma-ray in irradiation room bearing 50,000 Ci 60 Co. After the irradiation, they were cultured for 24 h in the presence of cytochalasin B to block cytokinesis, cytoplasm and nucleus were stained with DAPI and propidium iodide, and the number of binuclear cells bearing micronuclei was determined by fluorescent microscopy. For proliferation inhibition, cells were cultured for 48 h after the irradiation and [3H] thymidine was pulsed for 4 h before harvesting. Dose-rate in the irradiation room was measured with photoluminescence dosimeter. While irradiation time less than 24 h did not affect dose-response curves for both biological responses, they were remarkably attenuated as exposure time increased to more than 7 days. These biological responses were dependent on dose-rate rather than dose when cells were irradiated for 30 days. Moreover, percentage of micronucleus-forming cells cultured continuously for more than 60 days at the constant dose-rate, was gradually decreased in spite of the total dose accumulation. These results suggest that biological responses at low dose-rate, are remarkably affected by exposure time, that they are dependent on dose-rate rather than total dose in the case of long-term irradiation, and that cells are getting resistant to radiation after the continuous irradiation for 2 months. It is necessary to include effect of irradiation time and dose-rate sufficiently to evaluate risk

  17. Accuracy and optimal timing of activity measurements in estimating the absorbed dose of radioiodine in the treatment of Graves' disease

    Science.gov (United States)

    Merrill, S.; Horowitz, J.; Traino, A. C.; Chipkin, S. R.; Hollot, C. V.; Chait, Y.

    2011-02-01

    Calculation of the therapeutic activity of radioiodine 131I for individualized dosimetry in the treatment of Graves' disease requires an accurate estimate of the thyroid absorbed radiation dose based on a tracer activity administration of 131I. Common approaches (Marinelli-Quimby formula, MIRD algorithm) use, respectively, the effective half-life of radioiodine in the thyroid and the time-integrated activity. Many physicians perform one, two, or at most three tracer dose activity measurements at various times and calculate the required therapeutic activity by ad hoc methods. In this paper, we study the accuracy of estimates of four 'target variables': time-integrated activity coefficient, time of maximum activity, maximum activity, and effective half-life in the gland. Clinical data from 41 patients who underwent 131I therapy for Graves' disease at the University Hospital in Pisa, Italy, are used for analysis. The radioiodine kinetics are described using a nonlinear mixed-effects model. The distributions of the target variables in the patient population are characterized. Using minimum root mean squared error as the criterion, optimal 1-, 2-, and 3-point sampling schedules are determined for estimation of the target variables, and probabilistic bounds are given for the errors under the optimal times. An algorithm is developed for computing the optimal 1-, 2-, and 3-point sampling schedules for the target variables. This algorithm is implemented in a freely available software tool. Taking into consideration 131I effective half-life in the thyroid and measurement noise, the optimal 1-point time for time-integrated activity coefficient is a measurement 1 week following the tracer dose. Additional measurements give only a slight improvement in accuracy.

  18. Aircraft emission inventories for scheduled air traffic for the 1976-92 time period. Historical trends

    Energy Technology Data Exchange (ETDEWEB)

    Baughcum, S L; Henderson, S C; Tritz, T G [Boeing Co., Seattle, WA (United States)

    1998-12-31

    Emission inventories of fuel burned, NO{sub x}, CO, and hydrocarbons have been calculated for scheduled air traffic in 1976, 1984, 1990 and 1992 on a 1 deg latitude x 1 deg longitude x 1 km pressure altitude grid. Using this database, the seasonal variation and historical trends in aircraft emissions have been calculated for selected geographical regions (e.g., North Atlantic, Europe, North America, North Pacific). The trend in emissions is a combination of the effects of passenger demand growth, improved aircraft efficiency, changes in combustor characteristics, and aircraft size. (author) 8 refs.

  19. Aircraft emission inventories for scheduled air traffic for the 1976-92 time period. Historical trends

    Energy Technology Data Exchange (ETDEWEB)

    Baughcum, S.L.; Henderson, S.C.; Tritz, T.G. [Boeing Co., Seattle, WA (United States)

    1997-12-31

    Emission inventories of fuel burned, NO{sub x}, CO, and hydrocarbons have been calculated for scheduled air traffic in 1976, 1984, 1990 and 1992 on a 1 deg latitude x 1 deg longitude x 1 km pressure altitude grid. Using this database, the seasonal variation and historical trends in aircraft emissions have been calculated for selected geographical regions (e.g., North Atlantic, Europe, North America, North Pacific). The trend in emissions is a combination of the effects of passenger demand growth, improved aircraft efficiency, changes in combustor characteristics, and aircraft size. (author) 8 refs.

  20. Dose-time considerations in the treatment of anal cancer

    International Nuclear Information System (INIS)

    Constantinou, Eugene C.; Daly, William; Fung, Claire Y.; Willett, Christopher G.; De Laney, Thomas F.

    1996-01-01

    Purpose: Concurrent chemoradiation has become the standard initial treatment of primary anal carcinomas. The objective of this study was to analyze the impact on treatment outcome of a variety of patient and treatment variables including radiation dose and overall treatment time in patients treated with concurrent chemoradiation for anal carcinomas. Materials and Methods: Retrospective chart review on 50 patients with MO anal cancer treated with concurrent chemoradiation during the years 1984-1993. Patients were identified from the hospital tumor registries. The majority of patients received treatment with 5-FU 1000 mg/m 2 days 1-4, 29-33 and Mitomycin 10-15 mg/m 2 days 1 ± 29. Radiation was given at 180-200 cGy daily starting at day 1 to total doses of 23.6-67.2 Gy (median 54 Gy) usually by shrinking field technique. Local control, disease-free survival, and overall survival of the group was determined and then analyzed with respect to a variety of patient characteristics including T and N stage, histology, radiation dose, overall treatment time, hemoglobin at the start of treatment, age, HIV status, and sex. Local control, disease-free and overall survival were calculated using the Kaplan-Meier method. Tests for significance were done using the log-rank method. Results: Patient characteristics were: (1) histology-squamous 78 %, cloacogenic/basaloid 20%, and adenosquamous 2%; (2) age- range 30-82 years (median 58.5), (3) sex- female 58%, male 42%; (4) T stage- T1 16%, T2 46%, T3 24%, T4 8%, TX 6%; (5) N stage- NO 69%, N+ 23 %, NX 8%; (6) HIV (+) 8%, HIV(-/?) 92%. Follow-up ranged from 2-132 months (median 43 months). Overall survival was 66% and 44% at 5 and 10 years. Disease-free survival was 67% at 5 years and 59% at 10 years. Local control was 70% at 5 and 10 years. Five year local control by T stage: T stage- T1 87.5 %, T2 63%, T3 83%, T4 67%, TX 50%. Doses of ≥ 54 Gy are associated with improved 5-year survival (84 % vs. 47%, p=0.02), disease-free survival

  1. Solute concentration at a well in non-Gaussian aquifers under constant and time-varying pumping schedule

    Science.gov (United States)

    Libera, Arianna; de Barros, Felipe P. J.; Riva, Monica; Guadagnini, Alberto

    2017-10-01

    Our study is keyed to the analysis of the interplay between engineering factors (i.e., transient pumping rates versus less realistic but commonly analyzed uniform extraction rates) and the heterogeneous structure of the aquifer (as expressed by the probability distribution characterizing transmissivity) on contaminant transport. We explore the joint influence of diverse (a) groundwater pumping schedules (constant and variable in time) and (b) representations of the stochastic heterogeneous transmissivity (T) field on temporal histories of solute concentrations observed at an extraction well. The stochastic nature of T is rendered by modeling its natural logarithm, Y = ln T, through a typical Gaussian representation and the recently introduced Generalized sub-Gaussian (GSG) model. The latter has the unique property to embed scale-dependent non-Gaussian features of the main statistics of Y and its (spatial) increments, which have been documented in a variety of studies. We rely on numerical Monte Carlo simulations and compute the temporal evolution at the well of low order moments of the solute concentration (C), as well as statistics of the peak concentration (Cp), identified as the environmental performance metric of interest in this study. We show that the pumping schedule strongly affects the pattern of the temporal evolution of the first two statistical moments of C, regardless the nature (Gaussian or non-Gaussian) of the underlying Y field, whereas the latter quantitatively influences their magnitude. Our results show that uncertainty associated with C and Cp estimates is larger when operating under a transient extraction scheme than under the action of a uniform withdrawal schedule. The probability density function (PDF) of Cp displays a long positive tail in the presence of time-varying pumping schedule. All these aspects are magnified in the presence of non-Gaussian Y fields. Additionally, the PDF of Cp displays a bimodal shape for all types of pumping

  2. Evaluation of an every-other-day palonosetron schedule to control emesis in multiple-day high-dose chemotherapy.

    Science.gov (United States)

    Mirabile, Aurora; Celio, Luigi; Magni, Michele; Bonizzoni, Erminio; Gianni, Alessandro Massimo; Di Nicola, Massimo

    2014-12-01

    Efficacy of intermittent palonosetron dosing in patients undergoing multiple-day, high-dose chemotherapy (HDC) was investigated. Fifty-eight patients received palonosetron (0.25 mg intravenous [iv.]) every other day plus daily dexamethasone (8 mg iv. twice daily) dosing. The primary end point was complete control (CC; no emesis, no rescue anti-emetics, and no more than mild nausea) in the overall acute-period (until 24 h after chemotherapy completion). Acute-period CC occurred in 81% and 50% of patients receiving palonosetron and ondansetron (historical control cohort), respectively. Palonosetron (odds ratio [OR]: 4.37; p = 0.001) and a longer duration of HDC regimen (OR: 3.47; p = 0.011) independently predicted a better anti-emetic outcome. Palonosetron every other day plus daily dexamethasone is an effective anti-emetic coverage in patients undergoing HDC.

  3. Minimizing total weighted tardiness for the single machine scheduling problem with dependent setup time and precedence constraints

    Directory of Open Access Journals (Sweden)

    Hamidreza Haddad

    2012-04-01

    Full Text Available This paper tackles the single machine scheduling problem with dependent setup time and precedence constraints. The primary objective of this paper is minimization of total weighted tardiness. Since the complexity of the resulted problem is NP-hard we use metaheuristics method to solve the resulted model. The proposed model of this paper uses genetic algorithm to solve the problem in reasonable amount of time. Because of high sensitivity of GA to its initial values of parameters, a Taguchi approach is presented to calibrate its parameters. Computational experiments validate the effectiveness and capability of proposed method.

  4. Maximum Lateness Scheduling on Two-Person Cooperative Games with Variable Processing Times and Common Due Date

    OpenAIRE

    Liu, Peng; Wang, Xiaoli

    2017-01-01

    A new maximum lateness scheduling model in which both cooperative games and variable processing times exist simultaneously is considered in this paper. The job variable processing time is described by an increasing or a decreasing function dependent on the position of a job in the sequence. Two persons have to cooperate in order to process a set of jobs. Each of them has a single machine and their processing cost is defined as the minimum value of maximum lateness. All jobs have a common due ...

  5. Hepatitis A vaccine. A new convenient single-dose schedule with booster when long-term immunization is warranted

    DEFF Research Database (Denmark)

    Victor, J; Knudsen, J D; Nielsen, L P

    1994-01-01

    A total of 162 anti-HAV-negative healthy adults were immunized with a single high dose (1440 ELISA units = 1 ml) of inactivated hepatitis A vaccine and a booster was given at month 6. Antibodies were measured after modification of a commercial ELISA kit, enabling quantification of titres down to 6...

  6. A continuous time model for a short-term multiproduct batch process scheduling

    Directory of Open Access Journals (Sweden)

    Jenny Díaz Ramírez

    2018-01-01

    Full Text Available In the chemical industry, it is common to find production systems characterized by having a single stage or a previously identified bottleneck stage, with multiple non-identical parallel stations and with setup costs that depend on the production sequence. This paper proposes a mixed integer production-scheduling model that identifies lot size and product sequence that maximize profit. It considers multiple typical industry conditions, such as penalties for noncompliance or out of service periods of the productive units (or stations for preventive maintenance activities. The model was validated with real data from an oil chemical company.  Aiming to analyze its performance, we applied the model to 155 instances of production, which were obtained using Monte Carlo technique on the historical production data of the same company.  We obtained an average 12 % reduction in the total cost of production and a 19 % increase in the estimated profit.

  7. Socio-demographic determinants of timely adherence to BCG, Penta3, measles, and complete vaccination schedule in Burkina Faso.

    Science.gov (United States)

    Schoeps, A; Ouédraogo, N; Kagoné, M; Sié, A; Müller, O; Becher, H

    2013-12-17

    To identify the determinants of timely vaccination among young children in the North-West of Burkina Faso. This study included 1665 children between 12 and 23 months of age from the Nouna Health and Demographic Surveillance System, born between September 2006 and December 2008. The effect of socio-demographic variables on timely adherence to the complete vaccination schedule was studied in multivariable ordinal logistic regression with 3 distinct endpoints: (i) complete timely adherence, (ii) failure, and (iii) missing vaccination. Three secondary endpoints were timely vaccination with BCG, Penta3, and measles, which were studied with standard multivariable logistic regression. Mothers' education, socio-economic status, season of birth, and area of residence were significantly associated with failure of timely adherence to the complete vaccination schedule. Year of birth, ethnicity, and the number of siblings was significantly related to timely vaccination with Penta3 but not with BCG or measles vaccination. Children living in rural areas were more likely to fail timely vaccination with BCG than urban children (OR=1.79, 95%CI=1.24-2.58 (proximity to health facility), OR=3.02, 95%CI=2.18-4.19 (long distance to health facility)). In contrast, when looking at Penta3 and measles vaccination, children living in rural areas were far less likely to have failed timely vaccinations than urban children. Mother's education positively influenced timely adherence to the vaccination schedule (OR=1.42, 95%CI 1.06-1.89). There was no effect of household size or the age of the mother. Additional health facilities and encouragement of women to give birth in these facilities could improve timely vaccination with BCG. Rural children had an advantage over the urban children in timely vaccination, which is probably attributable to outreach vaccination teams amongst other factors. As urban children rely on their mothers' own initiative to get vaccinated, urban mothers should be

  8. Compliance to the prescribed dose and overall treatment time in five randomized clinical trials of altered fractionation in radiotherapy for head-and-neck carcinomas

    International Nuclear Information System (INIS)

    Khalil, Azza A.; Bentzen, Soeren M.; Bernier, Jacques; Saunders, Michele I.; Horiot, Jean-Claude; Bogaert, Walter van den; Cummings, Bernard J.; Dische, Stanley

    2003-01-01

    Purpose: To investigate compliance to the prescribed dose-fractionation schedule in five randomized controlled trials of altered fractionation in radiotherapy for head-and-neck carcinoma. Methods and Materials: Individual patient data from 2566 patients participating in the European Organization for Research and Treatment of Cancer (EORTC) 22791, EORTC 22811, EORTC 22851, Princess Margaret Hospital (PMH), and continuous hyperfractionated accelerated radiotherapy (CHART) head-and-neck trials were merged in the fractionation IMPACT (Intergroup Merger of Patient data from Altered or Conventional Treatment schedules) study database. The ideal treatment time was defined as the minimum time required to deliver a prescribed schedule. Compliance to the prescribed overall treatment time was quantified as the difference between the actual and the ideal overall time. An overall measure of compliance in an individual patient, the total dose lost (TDL), was calculated as the dose lost due to prolongation of therapy (assuming a D prolif of 0.64 Gy/day) plus the difference between the prescribed and the actual dose given. Results: The time in excess of the ideal ranged up to 97 days (average 3.9 days), and 25% of the patients had delays of 6 days or more. World Health Organization (WHO) performance status and nodal stage had a significant effect on TDL. TDL was significantly higher in the conventional than in the altered arm of the EORTC 22851 and CHART trials. In the PMH trial, TDL was significantly higher in the hyperfractionation than in the conventional arm. Centers participating in the three EORTC trials varied significantly in their compliance. There was a significant improvement in compliance in patients treated more recently. Conclusions: Even in randomized controlled trials, compliance to the prescribed radiation therapy schedule may be relatively poor, especially after conventional fractionation. This affects the interpretation of the outcome of these trials

  9. Outage scheduling and implementation

    International Nuclear Information System (INIS)

    Allison, J.E.; Segall, P.; Smith, R.R.

    1986-01-01

    Successful preparation and implementation of an outage schedule and completion of scheduled and emergent work within an identified critical path time frame is a result of careful coordination by Operations, Work Control, Maintenance, Engineering, Planning and Administration and others. At the Fast Flux Test Facility (FFTF) careful planning has been responsible for meeting all scheduled outage critical paths

  10. Hybrid Differential Evolution Optimisation for Earth Observation Satellite Scheduling with Time-Dependent Earliness-Tardiness Penalties

    Directory of Open Access Journals (Sweden)

    Guoliang Li

    2017-01-01

    Full Text Available We study the order acceptance and scheduling (OAS problem with time-dependent earliness-tardiness penalties in a single agile earth observation satellite environment where orders are defined by their release dates, available processing time windows ranging from earliest start date to deadline, processing times, due dates, sequence-dependent setup times, and revenues. The objective is to maximise total revenue, where the revenue from an order is a piecewise linear function of its earliness and tardiness with reference to its due date. We formulate this problem as a mixed integer linear programming model and develop a novel hybrid differential evolution (DE algorithm under self-adaptation framework to solve this problem. Compared with classical DE, hybrid DE employs two mutation operations, scaling factor adaptation and crossover probability adaptation. Computational tests indicate that the proposed algorithm outperforms classical DE in addition to two other variants of DE.

  11. TAGUCHI METHOD FOR THREE-STAGE ASSEMBLY FLOW SHOP SCHEDULING PROBLEM WITH BLOCKING AND SEQUENCE-DEPENDENT SET UP TIMES

    Directory of Open Access Journals (Sweden)

    AREF MALEKI-DARONKOLAEI

    2013-10-01

    Full Text Available This article considers a three-stage assembly flowshop scheduling problem minimizing the weighted sum of mean completion time and makespan with sequence-dependent setup times at the first stage and blocking times between each stage. To tackle such an NP-hard, two meta-heuristic algorithms are presented. The novelty of our approach is to develop a variable neighborhood search algorithm (VNS and a well-known simulated annealing (SA for the problem. Furthermore, to enhance the performance of the (SA, its parameters are optimized by the use of Taguchi method, but to setting parameters of VNS just one parameter has been used without Taguchi. The computational results show that the proposed VNS is better in mean and standard deviation for all sizes of the problem than SA, but on the contrary about CPU Time SA outperforms VNS.

  12. A Practical Framework to Study Low-Power Scheduling Algorithms on Real-Time and Embedded Systems

    Directory of Open Access Journals (Sweden)

    Jian (Denny Lin

    2014-05-01

    Full Text Available With the advanced technology used to design VLSI (Very Large Scale Integration circuits, low-power and energy-efficiency have played important roles for hardware and software implementation. Real-time scheduling is one of the fields that has attracted extensive attention to design low-power, embedded/real-time systems. The dynamic voltage scaling (DVS and CPU shut-down are the two most popular techniques used to design the algorithms. In this paper, we firstly review the fundamental advances in the research of energy-efficient, real-time scheduling. Then, a unified framework with a real Intel PXA255 Xscale processor, namely real-energy, is designed, which can be used to measure the real performance of the algorithms. We conduct a case study to evaluate several classical algorithms by using the framework. The energy efficiency and the quantitative difference in their performance, as well as the practical issues found in the implementation of these algorithms are discussed. Our experiments show a gap between the theoretical and real results. Our framework not only gives researchers a tool to evaluate their system designs, but also helps them to bridge this gap in their future works.

  13. A Flexible Job Shop Scheduling Problem with Controllable Processing Times to Optimize Total Cost of Delay and Processing

    Directory of Open Access Journals (Sweden)

    Hadi Mokhtari

    2015-11-01

    Full Text Available In this paper, the flexible job shop scheduling problem with machine flexibility and controllable process times is studied. The main idea is that the processing times of operations may be controlled by consumptions of additional resources. The purpose of this paper to find the best trade-off between processing cost and delay cost in order to minimize the total costs. The proposed model, flexible job shop scheduling with controllable processing times (FJCPT, is formulated as an integer non-linear programming (INLP model and then it is converted into an integer linear programming (ILP model. Due to NP-hardness of FJCPT, conventional analytic optimization methods are not efficient. Hence, in order to solve the problem, a Scatter Search (SS, as an efficient metaheuristic method, is developed. To show the effectiveness of the proposed method, numerical experiments are conducted. The efficiency of the proposed algorithm is compared with that of a genetic algorithm (GA available in the literature for solving FJSP problem. The results showed that the proposed SS provide better solutions than the existing GA.

  14. An Improved Version of Discrete Particle Swarm Optimization for Flexible Job Shop Scheduling Problem with Fuzzy Processing Time

    Directory of Open Access Journals (Sweden)

    Song Huang

    2016-01-01

    Full Text Available The fuzzy processing time occasionally exists in job shop scheduling problem of flexible manufacturing system. To deal with fuzzy processing time, fuzzy flexible job shop model was established in several papers and has attracted numerous researchers’ attention recently. In our research, an improved version of discrete particle swarm optimization (IDPSO is designed to solve flexible job shop scheduling problem with fuzzy processing time (FJSPF. In IDPSO, heuristic initial methods based on triangular fuzzy number are developed, and a combination of six initial methods is applied to initialize machine assignment and random method is used to initialize operation sequence. Then, some simple and effective discrete operators are employed to update particle’s position and generate new particles. In order to guide the particles effectively, we extend global best position to a set with several global best positions. Finally, experiments are designed to investigate the impact of four parameters in IDPSO by Taguchi method, and IDPSO is tested on five instances and compared with some state-of-the-art algorithms. The experimental results show that the proposed algorithm can obtain better solutions for FJSPF and is more competitive than the compared algorithms.

  15. Volume correction factor in time dose relationships in brachytherapy

    International Nuclear Information System (INIS)

    Supe, S.J.; Sasane, J.B.

    1987-01-01

    Paterson's clinical data about the maximum tolerance doses for various volumes of interstitial implants with Ra-226 delivered in seven days was made use of in deriving volume correction factors for TDF and CRE concepts respectively for brachytherapy. The derived volume correction factors for TDF and for CRE differ fromthe one assumed for CRE by Kirk et al. and implied for TDF by Goitein. A normalising volume of 70 cc has been suggested for both CRE and TDF concepts for brachytherapy. A table showing the volume corrected TDF is presented for various volumes and dose rates for continuous irradiation. The use of this table is illustrated with examples. (orig.) [de

  16. Floyd-A∗ Algorithm Solving the Least-Time Itinerary Planning Problem in Urban Scheduled Public Transport Network

    Directory of Open Access Journals (Sweden)

    Yu Zhang

    2014-01-01

    Full Text Available We consider an ad hoc Floyd-A∗ algorithm to determine the a priori least-time itinerary from an origin to a destination given an initial time in an urban scheduled public transport (USPT network. The network is bimodal (i.e., USPT lines and walking and time dependent. The modified USPT network model results in more reasonable itinerary results. An itinerary is connected through a sequence of time-label arcs. The proposed Floyd-A∗ algorithm is composed of two procedures designated as Itinerary Finder and Cost Estimator. The A∗-based Itinerary Finder determines the time-dependent, least-time itinerary in real time, aided by the heuristic information precomputed by the Floyd-based Cost Estimator, where a strategy is formed to preestimate the time-dependent arc travel time as an associated static lower bound. The Floyd-A∗ algorithm is proven to guarantee optimality in theory and, demonstrated through a real-world example in Shenyang City USPT network to be more efficient than previous procedures. The computational experiments also reveal the time-dependent nature of the least-time itinerary. In the premise that lines run punctually, “just boarding” and “just missing” cases are identified.

  17. A retrospective analysis of survival outcomes for two different radiotherapy fractionation schedules given in the same overall time for limited stage small cell lung cancer

    International Nuclear Information System (INIS)

    Bettington, Catherine S.; Bryant, Guy; Hickey, Brigid; Tripcony, Lee; Pratt, Gary; Fay, Michael

    2013-01-01

    To compare survival outcomes for two fractionation schedules of thoracic radiotherapy, both given over 3 weeks, in patients with limited stage small cell lung cancer (LS-SCLC). At Radiation Oncology Mater Centre (ROMC) and the Royal Brisbane and Women's Hospital (RBWH), patients with LS-SCLC treated with curative intent are given radiotherapy (with concurrent chemotherapy) to a dose of either 40Gy in 15 fractions ('the 40Gy/15⧣group') or 45Gy in 30 fractions ('the 45Gy/30⧣group'). The choice largely depends on institutional preference. Both these schedules are given over 3 weeks, using daily and twice-daily fractionation respectively. The records of all such patients treated from January 2000 to July 2009 were retrospectively reviewed and survival outcomes between the two groups compared. Of 118 eligible patients, there were 38 patients in the 40Gy/15⧣ group and 41 patients in the 45Gy/30⧣ group. The median relapse-free survival time was 12 months in both groups. Median overall survival was 21 months (95% CI 2–37 months) in the 40Gy/15⧣ group and 26 months (95% CI 1–48 months) in the 45Gy/30⧣ group. The 5-year overall survival rates were 20% and 25%, respectively (P=0.24). On multivariate analysis, factors influencing overall survival were: whether prophylactic cranial irradiation (PCI) was given (P=0.01) and whether salvage chemotherapy was given at the time of relapse (P=0.057). Given the small sample size, the potential for selection bias and the retrospective nature of our study it is not possible to draw firm conclusions regarding the efficacy of hypofractionated thoracic radiotherapy compared with hyperfractionated accelerated thoracic radiotherapy however hypofractionated radiotherapy may result in equivalent relapse-free survival.

  18. Experimental ultraviolet photocarcinogenesis: wavelength interactions and time-dose relationships.

    Science.gov (United States)

    Forbes, P D; Davies, R E; Urbach, F

    1978-12-01

    Tumors were induced in the skin of SKH hairless mice by exposure to fluorescent FS sun lamps or to a long-arc xenon solar simulator. Tumores developed about equally well with varying amounts of UV-A radiation (lambda greater than 320 nm) given simultaneously. In contrast, incremental changes in the UV-B region (lambda less than 320 nm) led to substantial increases in carcinogenic effectiveness. A tumor-"initiating" dose of UV-B (4-10 wk of daily FS lamp exposures) was rendered less effective by subsequent exposures of the mice to UV-A (6 hr/day, F-40 T12BL lamps). The mechanism for this effect is not known. Most tumors induced by a short course (10 wk) of FS lamp exposure grew slowly or regressed, whereas mice exposed for a longer period (30 wk) developed more tumors, and many of those that appeared early grew aggressively. Effects of daily dose fractionation were less clear, and the subject requires further study. These and other variables are being tested in a program designed to yield useful information on the effects of changing spectrum, dose, and dose delivery rates on sunlight-induced cancer.

  19. Statistical quality analysis of schedulers under soft-real-time constraints

    NARCIS (Netherlands)

    Baarsma, H.E.; Hurink, Johann L.; Jansen, P.G.

    2007-01-01

    This paper describes an algorithm to determine the performance of real-time systems with tasks using stochastic processing times. Such an algorithm can be used for guaranteeing Quality of Service of periodic tasks with soft real-time constraints. We use a discrete distribution model of processing

  20. Novel technique for prediction of time points for scheduling of multipurpose batch plants

    CSIR Research Space (South Africa)

    Seid, R

    2012-01-01

    Full Text Available . Consequently this avoids costly computational times due to iterations. In the model by Majozi and Zhu (2001) the sequence constraint that pertains to tasks that consume and produce the same state, the starting time of the consuming task at time point p must...

  1. Limited preemptive scheduling of mixed time-triggered and event-triggered tasks

    NARCIS (Netherlands)

    Heuvel, van den M.M.H.P.; Bril, R.J.; Zhang, X.; Abdullah, S.M.J.; Isovic, D.

    2013-01-01

    Many embedded systems have complex timing constraints and, at the same time, have flexibility requirements which prohibit offline planning of the entire system. To support a mixture of time-triggered and event-triggered tasks, some industrial systems deploy a table-driven dispatcher for

  2. Competitive On-Line Scheduling for Overloaded Real-Time Systems

    Science.gov (United States)

    1993-09-01

    Real - Time Systems by Gilad Koren a dissertation submitted in partial fulfillment of the requirements...Overloaded Real - Time Systems 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK...1.1 Introduction : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : 2 1.1.1 Real - Time Systems : : : : : : : : : : : : : : : : : : : : : : : : : : : :

  3. Power/performance trade-offs in real-time SDRAM command scheduling

    NARCIS (Netherlands)

    Goossens, S.L.M.; Chandrasekar, K.; Akesson, K.B.; Goossens, K.G.W.

    2016-01-01

    Real-time safety-critical systems should provide hard bounds on an applications’ performance. SDRAM controllers used in this domain should therefore have a bounded worst-case bandwidth, response time, and power consumption. Existing works on real-time SDRAM controllers only consider a narrow range

  4. Computational investigation of potential dosing schedules for a switch of medication from warfarin to rivaroxaban-an oral, direct Factor Xa inhibitor.

    Science.gov (United States)

    Burghaus, Rolf; Coboeken, Katrin; Gaub, Thomas; Niederalt, Christoph; Sensse, Anke; Siegmund, Hans-Ulrich; Weiss, Wolfgang; Mueck, Wolfgang; Tanigawa, Takahiko; Lippert, Jörg

    2014-01-01

    The long-lasting anticoagulant effect of vitamin K antagonists can be problematic in cases of adverse drug reactions or when patients are switched to another anticoagulant therapy. The objective of this study was to examine in silico the anticoagulant effect of rivaroxaban, an oral, direct Factor Xa inhibitor, combined with the residual effect of discontinued warfarin. Our simulations were based on the recommended anticoagulant dosing regimen for stroke prevention in patients with atrial fibrillation. The effects of the combination of discontinued warfarin plus rivaroxaban were simulated using an extended version of a previously validated blood coagulation computer model. A strong synergistic effect of the two distinct mechanisms of action was observed in the first 2-3 days after warfarin discontinuation; thereafter, the effect was close to additive. Nomograms for the introduction of rivaroxaban therapy after warfarin discontinuation were derived for Caucasian and Japanese patients using safety and efficacy criteria described previously, together with the coagulation model. The findings of our study provide a mechanistic pharmacologic rationale for dosing schedules during the therapy switch from warfarin to rivaroxaban and support the switching strategies as outlined in the Summary of Product Characteristics and Prescribing Information for rivaroxaban.

  5. Computational investigation of potential dosing schedules for a switch of medication from warfarin to rivaroxaban—an oral, direct Factor Xa inhibitor

    Science.gov (United States)

    Burghaus, Rolf; Coboeken, Katrin; Gaub, Thomas; Niederalt, Christoph; Sensse, Anke; Siegmund, Hans-Ulrich; Weiss, Wolfgang; Mueck, Wolfgang; Tanigawa, Takahiko; Lippert, Jörg

    2014-01-01

    The long-lasting anticoagulant effect of vitamin K antagonists can be problematic in cases of adverse drug reactions or when patients are switched to another anticoagulant therapy. The objective of this study was to examine in silico the anticoagulant effect of rivaroxaban, an oral, direct Factor Xa inhibitor, combined with the residual effect of discontinued warfarin. Our simulations were based on the recommended anticoagulant dosing regimen for stroke prevention in patients with atrial fibrillation. The effects of the combination of discontinued warfarin plus rivaroxaban were simulated using an extended version of a previously validated blood coagulation computer model. A strong synergistic effect of the two distinct mechanisms of action was observed in the first 2–3 days after warfarin discontinuation; thereafter, the effect was close to additive. Nomograms for the introduction of rivaroxaban therapy after warfarin discontinuation were derived for Caucasian and Japanese patients using safety and efficacy criteria described previously, together with the coagulation model. The findings of our study provide a mechanistic pharmacologic rationale for dosing schedules during the therapy switch from warfarin to rivaroxaban and support the switching strategies as outlined in the Summary of Product Characteristics and Prescribing Information for rivaroxaban. PMID:25426077

  6. Twelve-hour brain lithium concentration in lithium maintenance treatment of manic-depressive disorder: daily versus alternate-day dosing schedule

    DEFF Research Database (Denmark)

    Jensen, H.V.; Plenge, P; Stensgaard, A

    1996-01-01

    The 12-h brain lithium concentration was measured by lithium-7 magnetic resonance spectroscopy in ten manic-depressive patients receiving daily or alternate-day lithium carbonate treatment. The median dose of lithium carbonate was 800 mg in the daily treatment group and 1200 mg in the alternate......-day group. Median 12-h serum lithium concentration in the two groups was 0.86 mmol l-1 and 0.55 mmol l-1, respectively, while the corresponding concentration in brain was 0.67 mmol l-1 and 0.52 mmol l-1, respectively. The 12-h brain lithium concentration was independent of lithium dosing schedule (multiple...... linear regression), but correlated significantly with the 12-h serum lithium concentration (P = 0.003; B = 0.53, 95% c.l. 0.24-0.82; beta = 0.83). Thus at identical 12-h serum lithium concentrations the 12-h brain lithium concentration is similar with both treatment regimes. As the risk of manic...

  7. Using mean duration and variation of procedure times to plan a list of surgical operations to fit into the scheduled list time.

    Science.gov (United States)

    Pandit, Jaideep J; Tavare, Aniket

    2011-07-01

    It is important that a surgical list is planned to utilise as much of the scheduled time as possible while not over-running, because this can lead to cancellation of operations. We wished to assess whether, theoretically, the known duration of individual operations could be used quantitatively to predict the likely duration of the operating list. In a university hospital setting, we first assessed the extent to which the current ad-hoc method of operating list planning was able to match the scheduled operating list times for 153 consecutive historical lists. Using receiver operating curve analysis, we assessed the ability of an alternative method to predict operating list duration for the same operating lists. This method uses a simple formula: the sum of individual operation times and a pooled standard deviation of these times. We used the operating list duration estimated from this formula to generate a probability that the operating list would finish within its scheduled time. Finally, we applied the simple formula prospectively to 150 operating lists, 'shadowing' the current ad-hoc method, to confirm the predictive ability of the formula. The ad-hoc method was very poor at planning: 50% of historical operating lists were under-booked and 37% over-booked. In contrast, the simple formula predicted the correct outcome (under-run or over-run) for 76% of these operating lists. The calculated probability that a planned series of operations will over-run or under-run was found useful in developing an algorithm to adjust the planned cases optimally. In the prospective series, 65% of operating lists were over-booked and 10% were under-booked. The formula predicted the correct outcome for 84% of operating lists. A simple quantitative method of estimating operating list duration for a series of operations leads to an algorithm (readily created on an Excel spreadsheet, http://links.lww.com/EJA/A19) that can potentially improve operating list planning.

  8. A MODIFIED GIFFLER AND THOMPSON ALGORITHM COMBINED WITH DYNAMIC SLACK TIME FOR SOLVING DYNAMIC SCHEDULE PROBLEMS

    Directory of Open Access Journals (Sweden)

    Tanti Octavia

    2003-01-01

    Full Text Available A Modified Giffler and Thompson algorithm combined with dynamic slack time is used to allocate machines resources in dynamic nature. It was compared with a Real Time Order Promising (RTP algorithm. The performance of modified Giffler and Thompson and RTP algorithms are measured by mean tardiness. The result shows that modified Giffler and Thompson algorithm combined with dynamic slack time provides significantly better result compared with RTP algorithm in terms of mean tardiness.

  9. Real-time eye lens dose monitoring during cerebral angiography procedures

    International Nuclear Information System (INIS)

    Safari, M.J.; Wong, J.H.D.; Kadir, K.A.A.; Ng, K.H.; Thorpe, N.K.; Cutajar, D.L.; Petasecca, M.; Lerch, M.L.F.; Rosenfeld, A.B.

    2016-01-01

    To develop a real-time dose-monitoring system to measure the patient's eye lens dose during neuro-interventional procedures. Radiation dose received at left outer canthus (LOC) and left eyelid (LE) were measured using Metal-Oxide-Semiconductor Field-Effect Transistor dosimeters on 35 patients who underwent diagnostic or cerebral embolization procedures. The radiation dose received at the LOC region was significantly higher than the dose received by the LE. The maximum eye lens dose of 1492 mGy was measured at LOC region for an AVM case, followed by 907 mGy for an aneurysm case and 665 mGy for a diagnostic angiography procedure. Strong correlations (shown as R 2 ) were observed between kerma-area-product and measured eye doses (LOC: 0.78, LE: 0.68). Lateral and frontal air-kerma showed strong correlations with measured dose at LOC (AK L : 0.93, AK F : 0.78) and a weak correlation with measured dose at LE. A moderate correlation was observed between fluoroscopic time and dose measured at LE and LOC regions. The MOSkin dose-monitoring system represents a new tool enabling real-time monitoring of eye lens dose during neuro-interventional procedures. This system can provide interventionalists with information needed to adjust the clinical procedure to control the patient's dose. (orig.)

  10. Real-time eye lens dose monitoring during cerebral angiography procedures

    Energy Technology Data Exchange (ETDEWEB)

    Safari, M.J.; Wong, J.H.D.; Kadir, K.A.A.; Ng, K.H. [University of Malaya, Department of Biomedical Imaging, Faculty of Medicine, Kuala Lumpur (Malaysia); University of Malaya, University of Malaya Research Imaging Centre (UMRIC), Faculty of Medicine, Kuala Lumpur (Malaysia); Thorpe, N.K.; Cutajar, D.L.; Petasecca, M.; Lerch, M.L.F.; Rosenfeld, A.B. [University of Wollongong, Centre for Medical Radiation Physics (CMRP), Wollongong, NSW (Australia)

    2016-01-15

    To develop a real-time dose-monitoring system to measure the patient's eye lens dose during neuro-interventional procedures. Radiation dose received at left outer canthus (LOC) and left eyelid (LE) were measured using Metal-Oxide-Semiconductor Field-Effect Transistor dosimeters on 35 patients who underwent diagnostic or cerebral embolization procedures. The radiation dose received at the LOC region was significantly higher than the dose received by the LE. The maximum eye lens dose of 1492 mGy was measured at LOC region for an AVM case, followed by 907 mGy for an aneurysm case and 665 mGy for a diagnostic angiography procedure. Strong correlations (shown as R{sup 2}) were observed between kerma-area-product and measured eye doses (LOC: 0.78, LE: 0.68). Lateral and frontal air-kerma showed strong correlations with measured dose at LOC (AK{sub L}: 0.93, AK{sub F}: 0.78) and a weak correlation with measured dose at LE. A moderate correlation was observed between fluoroscopic time and dose measured at LE and LOC regions. The MOSkin dose-monitoring system represents a new tool enabling real-time monitoring of eye lens dose during neuro-interventional procedures. This system can provide interventionalists with information needed to adjust the clinical procedure to control the patient's dose. (orig.)

  11. Temporal analysis and scheduling of hard real-time radios running on a multi-processor

    NARCIS (Netherlands)

    Moreira, O.

    2012-01-01

    On a multi-radio baseband system, multiple independent transceivers must share the resources of a multi-processor, while meeting each its own hard real-time requirements. Not all possible combinations of transceivers are known at compile time, so a solution must be found that either allows for

  12. Effects of Scheduling Perceptions on Attitudes and Mobility in Different Part-Time Employee Types

    Science.gov (United States)

    Wittmer, Jenell L. S.; Martin, James E.

    2011-01-01

    Recent research supports the existence of a typology of part-time employees with demographic and behavioral differences. This research suggests that part-timers should not be viewed as one homogenous group and that certain part-time employee groups have fixed external role attachments, while others have more flexible attachments. Applying the…

  13. Abstractions for aperiodic multiprocessor scheduling of real-time stream processing applications

    NARCIS (Netherlands)

    Hausmans, J.P.H.M.

    2015-01-01

    Embedded multiprocessor systems are often used in the domain of real-time stream processing applications to keep up with increasing power and performance requirements. Examples of such real-time stream processing applications are digital radio baseband processing and WLAN transceivers. These stream

  14. Maximum Lateness Scheduling on Two-Person Cooperative Games with Variable Processing Times and Common Due Date

    Directory of Open Access Journals (Sweden)

    Peng Liu

    2017-01-01

    Full Text Available A new maximum lateness scheduling model in which both cooperative games and variable processing times exist simultaneously is considered in this paper. The job variable processing time is described by an increasing or a decreasing function dependent on the position of a job in the sequence. Two persons have to cooperate in order to process a set of jobs. Each of them has a single machine and their processing cost is defined as the minimum value of maximum lateness. All jobs have a common due date. The objective is to maximize the multiplication of their rational positive cooperative profits. A division of those jobs should be negotiated to yield a reasonable cooperative profit allocation scheme acceptable to them. We propose the sufficient and necessary conditions for the problems to have positive integer solution.

  15. Sleep-time sizing and scheduling in green passive optical networks

    KAUST Repository

    Elrasad, Amr; Khafagy, Mohammad G.; Shihada, Basem

    2012-01-01

    of traffic, control and data. Control traffic are delay intolerant with higher priority than the data traffic. Closed form model for average ONU sleeping time and end-to-end data traffic delay are presented and evaluated. Our framework decouples

  16. Scheduling of House Development Projects with CPM and PERT Method for Time Efficiency (Case Study: House Type 36)

    Science.gov (United States)

    Kholil, Muhammad; Nurul Alfa, Bonitasari; Hariadi, Madjumsyah

    2018-04-01

    Network planning is one of the management techniques used to plan and control the implementation of a project, which shows the relationship between activities. The objective of this research is to arrange network planning on house construction project on CV. XYZ and to know the role of network planning in increasing the efficiency of time so that can be obtained the optimal project completion period. This research uses descriptive method, where the data collected by direct observation to the company, interview, and literature study. The result of this research is optimal time planning in project work. Based on the results of the research, it can be concluded that the use of the both methods in scheduling of house construction project gives very significant effect on the completion time of the project. The company’s CPM (Critical Path Method) method can complete the project with 131 days, PERT (Program Evaluation Review and Technique) Method takes 136 days. Based on PERT calculation obtained Z = -0.66 or 0,2546 (from normal distribution table), and also obtained the value of probability or probability is 74,54%. This means that the possibility of house construction project activities can be completed on time is high enough. While without using both methods the project completion time takes 173 days. So using the CPM method, the company can save time up to 42 days and has time efficiency by using network planning.

  17. Toxicity Profile and Pharmacokinetic Study of A Phase I Low-Dose Schedule-Dependent Radiosensitizing Paclitaxel Chemoradiation Regimen for Inoperable Non-Small-Cell Lung Cancer

    International Nuclear Information System (INIS)

    Chen, Yuhchyau; Pandya, Kishan J.; Feins, Richard; Johnstone, David W.; Watson, Thomas; Smudzin, Therese; Keng, Peter C.

    2008-01-01

    Purpose: We report the toxicity profile and pharmacokinetic data of a schedule-dependent chemoradiation regimen using pulsed low-dose paclitaxel for radiosensitization in a Phase I study for inoperable non-small-cell lung cancer. Methods and Materials: Paclitaxel at escalating doses of 15 mg/m 2 , 20 mg/m 2 , and 25 mg/m 2 were infused on Monday, Wednesday, and Friday with daily chest radiation in cohorts of 6 patients. Daily radiation was delayed for maximal G2/M arrest and apoptotic effect, an observation from preclinical investigations. Plasma paclitaxel concentration was determined by high-performance liquid chromatography. Results: Dose-limiting toxicities included 3 of 18 patients with Grade 3 pneumonitis and 3 of 18 patients with Grade 3 esophagitis. There was no Grade 4 or 5 pneumonitis or esophagitis. There was also no Grade 3 or 4 neutropenia, thrombocytopenia, anemia or neuropathy. For Dose Levels I (15 mg/m 2 ), II (20 mg/m 2 ), and III (25 mg/m 2 ), the mean peak plasma level was 0.23 ± 0.06 μmol/l, 0.32 ± 0.05 μmol/l, and 0.52 ± 0.14 μmol/l, respectively; AUC was 0.44 ± 0.09 μmol/l, 0.61 ± 0.1 μmol/l, and 0.96 ± 0.23 μmol/l, respectively; and duration of drug concentration >0.05 μmol/l (t > 0.05 μmol/l) was 1.6 ± 0.3 h, 1.9 ± 0.2 h, and 3.0 ± 0.9 h, respectively. Conclusion: Pulsed low-dose paclitaxel chemoradiation is associated with low toxicity. Pharmacokinetic data showed that plasma paclitaxel concentration >0.05 μmol/l for a minimum of 1.6 h was sufficient for effective radiosensitization

  18. Esquema reduzido de vacinação anti-rábica humana pré-exposição e avaliação de doses anuais de reforço A reduced schedule for anti-rabic pre-exposure vaccination in humans and annual assessment booster doses

    Directory of Open Access Journals (Sweden)

    Esther Luiza Bocato Chamelet

    1982-06-01

    Full Text Available São apresentados os resultados do emprego de esquema de vacinação anti-rábida humana pré-exposição, constituído de 3 doses de vacina tipo Fuenzalida-Palacios administradas a 165 pacientes em dias alternados, mais uma dose de reforço no 30.° dia após a dose inicial. Os títulos de anticorpos foram determinados por prova de soroneutralização em amostras de sangue colhidas antes, 30 e 40 dias após administração da primeira dose. Verificou-se que no 30.° dia, 74,6% dos pacientes apresentaram anticorpos neutralizantes no soro, valor que se elevou a 98,1% no quadragésimo dia, o que mostra a eficácia do esquema em relação à resposta imunitária em tempo relativamente curto e a importância da dose de reforço como estímulo à produção de anticorpos. Nos pacientes submetidos às doses anuais de reforço num período de 10 anos, verificou-se aumento gradual da presença de anticorpos antes da administração da dose de reforço subseqüente, até atingir valores de 100%. Face aos resultados obtidos foi sugerido que as doses de reforço sejam administradas a intervalos de tempo maiores e precedidas da titulagem de anticorpos a fim de se avaliar da necessidade ou não de sua administração.A reduced schedule for a pre-exposure anti-rabic immunization, of humans with 3 doses of 1 ml of Fuenzalida-Palacios type vaccine administered on alternate days, plus one booster 30 days after the first dose, was related. The blood samples were collected on the 0, 30th and 40th day after the first vaccine dose and the antibody titration was performed by serum neutralizing test. It was observed that 74,6% of the patients presented serum neutralizing antibodies on the 30th day and 98.1% on the 40th day, demonstrating the efficacy of this reduced schedule in stimulating the antibody response in a short time. The importance of a booster dose was emphasized. In the patients submitted to annual boosters over a period of 10 years, a gradual increase in

  19. Electric space heating scheduling for real-time explicit power control in active distribution networks

    DEFF Research Database (Denmark)

    Costanzo, Giuseppe Tommaso; Bernstein, Andrey; Chamorro, Lorenzo Reyes

    2015-01-01

    This paper presents a systematic approach for abstracting the flexibility of a building space heating system and using it within a composable framework for real-time explicit power control of microgrids and, more in general, active distribution networks. In particular, the proposed approach...... is developed within the context of a previously defined microgrid control framework, called COMMELEC, conceived for the explicit and real-time control of these specific networks. The designed control algorithm is totally independent from the need of a building model and allows exploiting the intrinsic thermal...... inertia for real-time control. The paper first discusses the general approach, then it proves its validity via dedicated simulations performed on specific case study composed by the CIGRE LV microgrid benchmark proposed by the Cigré TF C6.04.02....

  20. Efficient Buffer Capacity and Scheduler Setting Computation for Soft Real-Time Stream Processing Applications

    NARCIS (Netherlands)

    Bekooij, Marco; Bekooij, Marco Jan Gerrit; Wiggers, M.H.; van Meerbergen, Jef

    2007-01-01

    Soft real-time applications that process data streams can often be intuitively described as dataflow process networks. In this paper we present a novel analysis technique to compute conservative estimates of the required buffer capacities in such process networks. With the same analysis technique

  1. A real-time networked camera system : a scheduled distributed camera system reduces the latency

    NARCIS (Netherlands)

    Karatoy, H.

    2012-01-01

    This report presents the results of a Real-time Networked Camera System, com-missioned by the SAN Group in TU/e. Distributed Systems are motivated by two reasons, the first reason is the physical environment as a requirement and the second reason is to provide a better Quality of Service (QoS). This

  2. Gain scheduling for non-linear time-delay systems using approximated model

    NARCIS (Netherlands)

    Pham, H.T.; Lim, J.T

    2012-01-01

    The authors investigate a regulation problem of non-linear systems driven by an exogenous signal and time-delay in the input. In order to compensate for the input delay, they propose a reduction transformation containing the past information of the control input. Then, by utilising the Euler

  3. Scheduling sampling to maximize information about time dependence in experiments with limited resources

    DEFF Research Database (Denmark)

    Græsbøll, Kaare; Christiansen, Lasse Engbo

    2013-01-01

    Looking for periodicity in sampled data requires that periods (lags) of different length are represented in the sampling plan. We here present a method to assist in planning of temporal studies with sparse resources, which optimizes the number of observed time lags for a fixed amount of samples w...

  4. Dynamic Scheduling of Object Invocations in Distributed Object Oriented Real-Time Systems

    DEFF Research Database (Denmark)

    Jørgensen, Bo Nørregaard; Joosen, Wouter

    1998-01-01

    This paper describes some of the issues that we investigate in order to develop distributed object computing middleware for application domains where timely cooperation and coordination between objects are crucial for guaranteeing correct system behavior. In particular, issues on admission contro...

  5. Communication scheduling in robust self-triggered MPC for linear discrete-time systems

    NARCIS (Netherlands)

    Brunner, F.D.; Gommans, T.M.P.; Heemels, W.P.M.H.; Allgöwer, F.

    2015-01-01

    We consider a networked control system consisting of a physical plant, an actuator, a sensor, and a controller that is connected to the actuator and sensor via a communication network. The plant is described by a linear discrete-time system subject to additive disturbances. In order to reduce the

  6. Echoes from the deep - Communication scheduling, localization and time-synchronization in underwater acoustic sensor networks.

    NARCIS (Netherlands)

    van Kleunen, W.A.P.

    2014-01-01

    Wireless Sensor Networks (WSNs) caused a shift in the way things are monitored. While traditional monitoring was coarse-grained and offline, using WSNs allows fine-grained and real-time monitoring. While radio-based WSNs are growing out of the stage of research to commercialization and widespread

  7. Energy-Aware Scheduling of FIR Filter Structures using a Timed Automata Model

    DEFF Research Database (Denmark)

    Wognsen, Erik Ramsgaard; Hansen, Rene Rydhof; Larsen, Kim Guldstrand

    2016-01-01

    structures where we initially derive data flow graphs and precedence graphs using the Synchronous Data Flow (SDF) notation. Based on actual measurements on the Altera Cyclone IV FPGA, we derive power and timing estimates for addition and multiplication, including idling power consumption. We next model...

  8. Scheduled MAC in Beacon Overlay Networks for Underwater Localization and Time-Synchronization

    NARCIS (Netherlands)

    van Kleunen, W.A.P.; Meratnia, Nirvana; Havinga, Paul J.M.

    2011-01-01

    In this article we introduce a MAC protocol designed for underwater localization and time-synchronisation. The MAC protocol assumes a network of static reference nodes and allows blind nodes to be localized by listening-only to the beacon messages. Such a system is known to be very scalable. We show

  9. Collaborative real-time scheduling of multiple PTZ cameras for multiple object tracking in video surveillance

    Science.gov (United States)

    Liu, Yu-Che; Huang, Chung-Lin

    2013-03-01

    This paper proposes a multi-PTZ-camera control mechanism to acquire close-up imagery of human objects in a surveillance system. The control algorithm is based on the output of multi-camera, multi-target tracking. Three main concerns of the algorithm are (1) the imagery of human object's face for biometric purposes, (2) the optimal video quality of the human objects, and (3) minimum hand-off time. Here, we define an objective function based on the expected capture conditions such as the camera-subject distance, pan tile angles of capture, face visibility and others. Such objective function serves to effectively balance the number of captures per subject and quality of captures. In the experiments, we demonstrate the performance of the system which operates in real-time under real world conditions on three PTZ cameras.

  10. Modeling Real-Time Human-Automation Collaborative Scheduling of Unmanned Vehicles

    Science.gov (United States)

    2013-06-01

    Bundle Algorithm (CBBA), a decentralized, polynomial-time, market based protocol (Choi, et al., 2009). More details on the AS can be found in (Whitten...infonned consent to panicipate in this research study. Signature oflnvesligator Date Approved on 31-0CT-2012 - MIT JRB Protocol #: 1110005179- Expires on...presented at the IEEE International Conference on Robotics and Automation, Karlsruhe, Germany. Miller, C. (2004). Human-Computer Etiquette : Managing

  11. A Review of Just-In-Time Scheduling for Production and Logistics

    OpenAIRE

    田村, 隆善

    1999-01-01

    The Just-In-Time (JIT) production has been developed as a subsystem of the "whole" Toyota production system (TPS). Currently JIT or JIT production means the TPS especially in foreign countries. It is recognized that JIT is a key concept for enterprises competing in the diversified-products market. The technologies used in JIT are comprehensive and include technologies to design, install and control a production system, which are classified into three categories : hardware, information and sof...

  12. A Schedulability Analysis Framework for Real-time Infrastructure Systems Managing Heterogeneous Resources

    OpenAIRE

    Kim, Jinhyun; Kang, Sungwon

    2012-01-01

    REACTION 2012. 1st International workshop on Real-time and distributed computing in emerging applications. December 4th, 2012, San Juan, Puerto Rico. Electricity generating systems, such as smart grid systems, and water management systems are infrastructure systems that manage resources critical to human life. In the systems, resources are produced and managed to supply them to various consumers, such as building, car, factory, and household, according to their needs and pri...

  13. Energy Savings by Wireless Control of Speed, Scheduling and Travel Times for Hauling Operation

    OpenAIRE

    Rylander, David; Axelsson, Jakob; Wallin, Peter

    2014-01-01

    A Quarry and Aggregate production site consist of sequential production processes and activities to process and produce the output products. Compared to a fixed manufacturing plant, the quarry processes involve mobile machines such as wheel loaders, trucks and articulated haulers and a highly dynamic road infrastructure. Today, the mobile machines are generally not synchronized or controlled towards the overall throughput of the site in real time. This indicates a general improvement potentia...

  14. ARAC: A flexible real-time dose consequence assessment system

    International Nuclear Information System (INIS)

    Ellis, J.S.; Sullivan, T.J.

    1993-01-01

    Since its beginning, the Atmospheric Release Advisory Capability (ARAC), an emergency radiological dose assessment service of the US Government, has been called on to do consequence assessments for releases into the atmosphere of radionuclides and a variety of other substances. Some of the more noteworthy emergency responses have been for the Three Mile Island and Chernobyl nuclear power reactor accidents, and more recently, for a cloud of gases from a rail-car spill into the Sacramento river of the herbicide metam sodium, smoke from hundreds of burning oil wells in Kuwait, and ash clouds from the eruption of Mt. Pinatubo. The spatial scales of these responses range from local, to regional, to global, and the response periods from hours, to weeks, to months. Because of the variety of requirements of each unique assessment, ARAC has developed and maintains a flexible system of people, computer software and hardware

  15. Two phase genetic algorithm for vehicle routing and scheduling problem with cross-docking and time windows considering customer satisfaction

    Science.gov (United States)

    Baniamerian, Ali; Bashiri, Mahdi; Zabihi, Fahime

    2018-03-01

    Cross-docking is a new warehousing policy in logistics which is widely used all over the world and attracts many researchers attention to study about in last decade. In the literature, economic aspects has been often studied, while one of the most significant factors for being successful in the competitive global market is improving quality of customer servicing and focusing on customer satisfaction. In this paper, we introduce a vehicle routing and scheduling problem with cross-docking and time windows in a three-echelon supply chain that considers customer satisfaction. A set of homogeneous vehicles collect products from suppliers and after consolidation process in the cross-dock, immediately deliver them to customers. A mixed integer linear programming model is presented for this problem to minimize transportation cost and early/tardy deliveries with scheduling of inbound and outbound vehicles to increase customer satisfaction. A two phase genetic algorithm (GA) is developed for the problem. For investigating the performance of the algorithm, it was compared with exact and lower bound solutions in small and large-size instances, respectively. Results show that there are at least 86.6% customer satisfaction by the proposed method, whereas customer satisfaction in the classical model is at most 33.3%. Numerical examples results show that the proposed two phase algorithm could achieve optimal solutions in small-size instances. Also in large-size instances, the proposed two phase algorithm could achieve better solutions with less gap from the lower bound in less computational time in comparison with the classic GA.

  16. Lot-Order Assignment Applying Priority Rules for the Single-Machine Total Tardiness Scheduling with Nonnegative Time-Dependent Processing Times

    Directory of Open Access Journals (Sweden)

    Jae-Gon Kim

    2015-01-01

    Full Text Available Lot-order assignment is to assign items in lots being processed to orders to fulfill the orders. It is usually performed periodically for meeting the due dates of orders especially in a manufacturing industry with a long production cycle time such as the semiconductor manufacturing industry. In this paper, we consider the lot-order assignment problem (LOAP with the objective of minimizing the total tardiness of the orders with distinct due dates. We show that we can solve the LOAP optimally by finding an optimal sequence for the single-machine total tardiness scheduling problem with nonnegative time-dependent processing times (SMTTSP-NNTDPT. Also, we address how the priority rules for the SMTTSP can be modified to those for the SMTTSP-NNTDPT to solve the LOAP. In computational experiments, we discuss the performances of the suggested priority rules and show the result of the proposed approach outperforms that of the commercial optimization software package.

  17. Wait Time Management Strategies for Scheduled Care: What Makes Them Succeed?

    Science.gov (United States)

    Pomey, Marie-Pascale; Forest, Pierre-Gerlier; Sanmartin, Claudia; De Coster, Carolyn; Drew, Madeleine

    2010-01-01

    Objectives: To assess experts' perceptions of the contextual and local factors that promote or inhibit the implementation of waiting time management strategies (WTMS) in Canadian healthcare organizations. Methods: We conducted 16 semi-structured interviews and one focus group with individuals involved in WTMS at the federal, provincial or organizational level. Results: The most frequently cited local factor was physicians' participation. Physicians' leadership made the greatest difference in bringing resistant physicians on board. To be effective, however, local leadership had to be supported by senior management. Alignment of financial incentives between the contextual and local levels was also frequently cited, and interviewees stressed the importance of tools used to design, monitor, evaluate and prioritize WTMS. Conclusions: Finding the right balance between supportive resources and tools and an effective management system is a tough challenge. But achieving this balance will help reconcile contradictions between top-down and bottom-up WTMS. PMID:21286269

  18. Wait time management strategies for scheduled care: what makes them succeed?

    Science.gov (United States)

    Pomey, Marie-Pascale; Forest, Pierre-Gerlier; Sanmartin, Claudia; De Coster, Carolyn; Drew, Madeleine

    2010-02-01

    To assess experts' perceptions of the contextual and local factors that promote or inhibit the implementation of waiting time management strategies (WTMS) in Canadian healthcare organizations. We conducted 16 semi-structured interviews and one focus group with individuals involved in WTMS at the federal, provincial or organizational level. The most frequently cited local factor was physicians' participation. Physicians' leadership made the greatest difference in bringing resistant physicians on board. To be effective, however, local leadership had to be supported by senior management. Alignment of financial incentives between the contextual and local levels was also frequently cited, and interviewees stressed the importance of tools used to design, monitor, evaluate and prioritize WTMS. Finding the right balance between supportive resources and tools and an effective management system is a tough challenge. But achieving this balance will help reconcile contradictions between top-down and bottom-up WTMS.

  19. A Practical and Robust Execution Time-Frame Procedure for the Multi-Mode Resource-Constrained Project Scheduling Problem with Minimal and Maximal Time Lags

    Directory of Open Access Journals (Sweden)

    Angela Hsiang-Ling Chen

    2016-09-01

    Full Text Available Modeling and optimizing organizational processes, such as the one represented by the Resource-Constrained Project Scheduling Problem (RCPSP, improve outcomes. Based on assumptions and simplification, this model tackles the allocation of resources so that organizations can continue to generate profits and reinvest in future growth. Nonetheless, despite all of the research dedicated to solving the RCPSP and its multi-mode variations, there is no standardized procedure that can guide project management practitioners in their scheduling tasks. This is mainly because many of the proposed approaches are either based on unrealistic/oversimplified scenarios or they propose solution procedures not easily applicable or even feasible in real-life situations. In this study, we solve a more true-to-life and complex model, Multimode RCPSP with minimal and maximal time lags (MRCPSP/max. The complexity of the model solved is presented, and the practicality of the proposed approach is justified depending on only information that is available for every project regardless of its industrial context. The results confirm that it is possible to determine a robust makespan and to calculate an execution time-frame with gaps lower than 11% between their lower and upper bounds. In addition, in many instances, the solved lower bound obtained was equal to the best-known optimum.

  20. An integrated modeling framework for real-time irrigation scheduling: the benefit of spectroscopy and weather forecasts

    Science.gov (United States)

    Brook, Anna; Polinova, Maria; Housh, Mashor

    2016-04-01

    Agriculture and agricultural landscapes are increasingly under pressure to meet the demands of a constantly increasing human population and globally changing food patterns. At the same time, there is rising concern that climate change and food security will harm agriculture in many regions of the world (Nelson et al., 2009). Facing those treats, majority of Mediterranean countries had chosen irrigated agriculture. For crop plants water is one of the most important inputs, as it is responsible for crop growth, production and it ensures the efficiency of other inputs (e.g. seeds, fertilizers and pesticide) but its use is in competition with other local sectors (e.g. industry, urban human use). Thus, well-timed availability of water is vital to agriculture for ensured yields. The increasing demand for irrigation has necessitated the need for optimal irrigation scheduling techniques that coordinate the timing and amount of irrigation to optimally manage the water use in agriculture systems. The irrigation scheduling problem can be challenging as farmers try to deal with different conflicting objectives of maximizing their yield while minimizing irrigation water use. Another challenge in the irrigation scheduling problem is attributed to the uncertain factors involved in the plant growth process during the growing season. Most notable, the climatic factors such as evapotranspiration and rainfall, these uncertain factors add a third objective to the farmer perspective, namely, minimizing the risk associated with these uncertain factors. Nevertheless, advancements in weather forecasting reduced the uncertainty level associated with future climatic data. Thus, climatic forecasts can be reliably employed to guide optimal irrigation schedule scheme when coupled with stochastic optimization models (Housh et al., 2012). Many studies have concluded that optimal irrigation decisions can provide substantial economic value over conventional irrigation decisions (Wang and Cai 2009

  1. Real-Time Patient and Staff Radiation Dose Monitoring in IR Practice

    Energy Technology Data Exchange (ETDEWEB)

    Sailer, Anna M., E-mail: karmanna@stanford.edu; Paulis, Leonie, E-mail: leonie.paulis@mumc.nl; Vergoossen, Laura; Kovac, Axel O., E-mail: axel.kovac@mumc.nl; Wijnhoven, Geert, E-mail: g.wijnhoven@mumc.nl [Maastricht University Medical Centre, Department of Radiology (Netherlands); Schurink, Geert Willem H., E-mail: gwh.schurink@mumc.nl; Mees, Barend, E-mail: barend.mees@mumc.nl [Maastricht University Medical Centre, Department of Vascular Surgery (Netherlands); Das, Marco, E-mail: m.das@mumc.nl; Wildberger, Joachim E., E-mail: j.wildberger@mumc.nl; Haan, Michiel W. de, E-mail: m.de.haan@mumc.nl; Jeukens, Cécile R. L. P. N., E-mail: cecile.jeukens@mumc.nl [Maastricht University Medical Centre, Department of Radiology (Netherlands)

    2017-03-15

    PurposeKnowledge of medical radiation exposure permits application of radiation protection principles. In our center, the first dedicated real-time, automated patient and staff dose monitoring system (DoseWise Portal, Philips Healthcare) was installed. Aim of this study was to obtain insight in the procedural and occupational doses.Materials and MethodsAll interventional radiologists, vascular surgeons, and technicians wore personal dose meters (PDMs, DoseAware, Philips Healthcare). The dose monitoring system simultaneously registered for each procedure dose-related data as the dose area product (DAP) and effective staff dose (E) from PDMs. Use and type of shielding were recorded separately. All procedures were analyzed according to procedure type; these included among others cerebral interventions (n = 112), iliac and/or caval venous recanalization procedures (n = 68), endovascular aortic repair procedures (n = 63), biliary duct interventions (n = 58), and percutaneous gastrostomy procedure (n = 28).ResultsMedian (±IQR) DAP doses ranged from 2.0 (0.8–3.1) (percutaneous gastrostomy) to 84 (53–147) Gy cm{sup 2} (aortic repair procedures). Median (±IQR) first operator doses ranged from 1.6 (1.1–5.0) μSv to 33.4 (12.1–125.0) for these procedures, respectively. The relative exposure, determined as first operator dose normalized to procedural DAP, ranged from 1.9 in biliary interventions to 0.1 μSv/Gy cm{sup 2} in cerebral interventions, indicating large variation in staff dose per unit DAP among the procedure types.ConclusionReal-time dose monitoring was able to identify the types of interventions with either an absolute or relatively high staff dose, and may allow for specific optimization of radiation protection.

  2. Scheduling by positional completion times: analysis of a two-stage flow shop problem with a batching machine

    NARCIS (Netherlands)

    Hoogeveen, J.A.; Velde, van de S.L.

    1998-01-01

    We consider a scheduling problem introduced by Ahmadi et al., Batching and scheduling jobs on batch and discrete processors, Operation Research 40 (1992) 750–763, in which each job has to be prepared before it can be processed. The preparation is performed by a batching machine; it can prepare at

  3. Comparison of two-dose priming plus 9-month booster with a standard three-dose priming schedule for a ten-valent pneumococcal conjugate vaccine in Nepalese infants: a randomised, controlled, open-label, non-inferiority trial.

    Science.gov (United States)

    Hamaluba, Mainga; Kandasamy, Rama; Upreti, Shyam R; Subedi, Giri R; Shrestha, Shrijana; Bhattarai, Shiva; Gurung, Meeru; Pradhan, Rahul; Voysey, Merryn; Gurung, Santosh; Pradhan, Shachi; Thapa, Anushil K; Maharjan, Rakesh; Kiran, Usha; Kerridge, Simon A; Hinds, Jason; van der Klis, Fiona; Snape, Matthew D; Murdoch, David R; Kelly, Sarah; Kelly, Dominic F; Adhikari, Neelam; Thorson, Stephen; Pollard, Andrew J

    2015-04-01

    Use of pneumococcal conjugate vaccines (PCVs) in resource-poor countries has focused on early infant immunisation with little emphasis on protection in late infancy and beyond. Boosting of the immune response later in infancy might provide improved persistence of immunogenicity into early childhood, however data are scarce. The aim of this study was to investigate if a two-dose prime with booster at age 9 months compared with a three-dose prime-only PCV schedule provided non-inferior immunogenicity in early infancy and superior persistence of antibody responses in early childhood. We did an open-label, randomised, parallel group, controlled trial in healthy infants aged 40-60 days from Kathmandu, Nepal. Participants were randomly allocated (4:4:5 ratio) to receive PCV10 in addition to routine immunisations either as a two-dose prime and boost (2+1), three-dose prime (3+0), or two doses after completion of the initial study phase (0+2). We used a computer generated randomisation list with randomly varying block sizes. We followed up participants at age 2-4 years together with a group of unvaccinated controls. Sera were analysed for opsonophagocytic activity, protein D, and PCV10 serotype-specific IgG. Laboratory staff was masked to intervention group assignment. The primary outcome measure was to determine the proportion of participants in the 2+1 group at age 10 months with specific IgG for serotypes 1, 5, and 14 of at least 0·2 μg/mL in the per-protocol population. The secondary outcomes were non-inferiority (within 10% levels) at age 18 weeks for the proportion of participants in the 2+1 group compared with the 3+0 group with serotypes 1, 5, and 14 specific IgG of at least 0·2 μg/mL; the proportion of participants with PCV10 serotype-specific IgG of at least 0·2 μg/mL and opsonophagocytic activity reciprocal titre of at least 8 at ages 18 weeks and 10 months; and nasopharyngeal pneumococcal serotype-specific carriage rates at age 9 months in each study

  4. Refinery scheduling

    Energy Technology Data Exchange (ETDEWEB)

    Magalhaes, Marcus V.; Fraga, Eder T. [PETROBRAS, Rio de Janeiro, RJ (Brazil); Shah, Nilay [Imperial College, London (United Kingdom)

    2004-07-01

    This work addresses the refinery scheduling problem using mathematical programming techniques. The solution adopted was to decompose the entire refinery model into a crude oil scheduling and a product scheduling problem. The envelope for the crude oil scheduling problem is composed of a terminal, a pipeline and the crude area of a refinery, including the crude distillation units. The solution method adopted includes a decomposition technique based on the topology of the system. The envelope for the product scheduling comprises all tanks, process units and products found in a refinery. Once crude scheduling decisions are Also available the product scheduling is solved using a rolling horizon algorithm. All models were tested with real data from PETROBRAS' REFAP refinery, located in Canoas, Southern Brazil. (author)

  5. Optimal dose reduction in computed tomography methodologies predicted from real-time dosimetry

    Science.gov (United States)

    Tien, Christopher Jason

    Over the past two decades, computed tomography (CT) has become an increasingly common and useful medical imaging technique. CT is a noninvasive imaging modality with three-dimensional volumetric viewing abilities, all in sub-millimeter resolution. Recent national scrutiny on radiation dose from medical exams has spearheaded an initiative to reduce dose in CT. This work concentrates on dose reduction of individual exams through two recently-innovated dose reduction techniques: organ dose modulation (ODM) and tube current modulation (TCM). ODM and TCM tailor the phase and amplitude of x-ray current, respectively, used by the CT scanner during the scan. These techniques are unique because they can be used to achieve patient dose reduction without any appreciable loss in image quality. This work details the development of the tools and methods featuring real-time dosimetry which were used to provide pioneering measurements of ODM or TCM in dose reduction for CT.

  6. Hybrid Pareto artificial bee colony algorithm for multi-objective single machine group scheduling problem with sequence-dependent setup times and learning effects.

    Science.gov (United States)

    Yue, Lei; Guan, Zailin; Saif, Ullah; Zhang, Fei; Wang, Hao

    2016-01-01

    Group scheduling is significant for efficient and cost effective production system. However, there exist setup times between the groups, which require to decrease it by sequencing groups in an efficient way. Current research is focused on a sequence dependent group scheduling problem with an aim to minimize the makespan in addition to minimize the total weighted tardiness simultaneously. In most of the production scheduling problems, the processing time of jobs is assumed as fixed. However, the actual processing time of jobs may be reduced due to "learning effect". The integration of sequence dependent group scheduling problem with learning effects has been rarely considered in literature. Therefore, current research considers a single machine group scheduling problem with sequence dependent setup times and learning effects simultaneously. A novel hybrid Pareto artificial bee colony algorithm (HPABC) with some steps of genetic algorithm is proposed for current problem to get Pareto solutions. Furthermore, five different sizes of test problems (small, small medium, medium, large medium, large) are tested using proposed HPABC. Taguchi method is used to tune the effective parameters of the proposed HPABC for each problem category. The performance of HPABC is compared with three famous multi objective optimization algorithms, improved strength Pareto evolutionary algorithm (SPEA2), non-dominated sorting genetic algorithm II (NSGAII) and particle swarm optimization algorithm (PSO). Results indicate that HPABC outperforms SPEA2, NSGAII and PSO and gives better Pareto optimal solutions in terms of diversity and quality for almost all the instances of the different sizes of problems.

  7. Approximating Preemptive Stochastic Scheduling

    OpenAIRE

    Megow Nicole; Vredeveld Tjark

    2009-01-01

    We present constant approximative policies for preemptive stochastic scheduling. We derive policies with a guaranteed performance ratio of 2 for scheduling jobs with release dates on identical parallel machines subject to minimizing the sum of weighted completion times. Our policies as well as their analysis apply also to the recently introduced more general model of stochastic online scheduling. The performance guarantee we give matches the best result known for the corresponding determinist...

  8. Development of a Real-time Hand Dose Monitor for Personnel in Interventional Radiology

    Energy Technology Data Exchange (ETDEWEB)

    Ban, N.; Nakaoka, H.; Haruta, R.; Murakami, Y.; Kubo, T.; Maeda, T.; Kusama, T

    2001-07-01

    Medical procedures denoted as interventional radiology require operation near an X ray beam, which brings high dose exposures to the operators' hands. For the effectual control of their extremity doses, a prototype of a real-time wrist dosemeter has been developed, hand dose monitor (HDM), based on a single silicon detector. Experiments were performed to test its response to diagnostic X rays. The HDM was highly sensitive and showed a linear response down to doses of a few tens of microsieverts. Though dose rate, energy and angular dependence of the response were observed in some extreme conditions, the HDM was proved to be of practical use if it was appropriately calibrated. Since an HDM enables personnel to check their hand doses on a real-time basis, it would enable medical staff to control the exposure themselves. (author)

  9. The impact of closed-loop electronic medication management on time to first dose: a comparative study between paper and digital hospital environments.

    Science.gov (United States)

    Austin, Jodie A; Smith, Ian R; Tariq, Amina

    2018-01-22

    Closed-loop electronic medication management systems (EMMS) are recognised as an effective intervention to improve medication safety, yet evidence of their effectiveness in hospitals is limited. Few studies have compared medication turnaround time for a closed-loop electronic versus paper-based medication management environment. To compare medication turnaround times in a paper-based hospital environment with a digital hospital equipped with a closed-loop EMMS, consisting of computerised physician order entry, profiled automated dispensing cabinets packaged with unit dose medications and barcode medication administration. Data were collected during 2 weeks at three private hospital sites (one with closed-loop EMMS) within the same organisation network in Queensland, Australia. Time between scheduled and actual administration times was analysed for first dose of time-critical and non-critical medications located on the ward or sourced via pharmacy. Medication turnaround times at the EMMS site were less compared to the paper-based sites (median, IQR: 35 min, 8-57 min versus 120 min, 30-180 min, P medications, 77% were administered within 60 min of scheduled time at the EMMS site versus 38% for the paper-based sites. Similar difference was observed for non-critical medications, 80% were administered within 60 min of their scheduled time at the EMMS site versus 41% at the paper-based facilities. The study indicates medication turnaround times utilising a closed-loop EMMS are less compared to paper-based systems. This improvement may be attributable to increased accessibility of medications using automated dispensing cabinets and electronic medication administration records flagging tasks to nurses in real time. © 2018 Royal Pharmaceutical Society.

  10. Intensification of antitumor radiation effect by metronidazole and short-term hyperglycemia and dependence of therapeutic effect on schedules of fractionation and value of single dose

    International Nuclear Information System (INIS)

    Venkhvadze, N.G.

    1988-01-01

    Combined application of metronidazole and short-term hyperglycemia under fractionated irradiation of sarcoma-45, 340 in white rats-males is studied. Tumors were γ-irradiated with 60 Co threefold in 48 hours at 15 Gy single dose or irradiated threefold in a week at 20, 25 and 30 Gy doses. Efficiency of experimental therapy is cheked by dynamics of tumor regression, a number of animals with tumors reabsorbed temporarily, a number of animals recovered and time of tumor grouth up to the initial volume. It is established that combined application of metronidazole and short-term hyperglycemia under fractionated irradiation increases essentially the efficiency of radiotherapy carried out by large fractions with great time intervals. 7 refs.; 1 fig.; 2 tabs

  11. Scientific remedies: it’s time to up the dose

    CERN Multimedia

    2015-01-01

    Last week, I spent some time attending the annual meeting of the World Economic Forum in Davos. As Director-General of CERN, I have a standing invitation and it’s one that I have regularly taken up. I go there to promote the science agenda to leaders from all areas of society. Over the years, there’s no doubt that science has moved up the agenda, but there’s still a considerable way to go.   The first time I went, I gave a presentation about physics and spent the rest of my time learning how Davos works. It did not take long to figure out that such presentations are essentially there to entertain the participants, and that the main purpose of Davos is meeting people and networking. It’s an opportunity to take the world’s pulse – and, if the pulse indicates that a remedy is required, to inject a little scientific medicine. My message at Davos has evolved from sharing the excitement of the quest for knowledge to pointing out the neces...

  12. Counting the minutes: administrative control of work schedules and time management of secondary school teachers in Québec.

    Science.gov (United States)

    Riel, Jessica; Messing, Karen

    2011-01-01

    Québec teachers have been identified as having a high level of stress and having difficulties with work-family balancing (WFB). An analysis of their work activity was done to identify task elements that could be changed. Work of 15 teachers was observed and 20 other teachers were interviewed. Ergonomic analysis, a mixed method that combines qualitative analysis with some quantitative data: 87 hours' observation; 15 interviews. Environmental parameters were recorded in 8 classrooms and in two faculty workrooms. Working postures were recorded. Teachers were subject to numerous demands in an often inadequate environment. A new management practice required teachers to spend 300 min/week outside class but in school, where their work could be monitored. The timed and scheduled tasks could not be done in the rooms provided due to overcrowding, inadequate physical environment, and lack of access to computers and telephones. Time at home decreased but work done at home did not. The physical environment of teaching impacts teaching activity. Work organization that treats a complex, results-oriented task as if it could be well represented by the number of supervised minutes spent on it can be problematic. WFB should be considered when work is re-organized.

  13. wayGoo recommender system: personalized recommendations for events scheduling, based on static and real-time information

    Science.gov (United States)

    Thanos, Konstantinos-Georgios; Thomopoulos, Stelios C. A.

    2016-05-01

    wayGoo is a fully functional application whose main functionalities include content geolocation, event scheduling, and indoor navigation. However, significant information about events do not reach users' attention, either because of the size of this information or because some information comes from real - time data sources. The purpose of this work is to facilitate event management operations by prioritizing the presented events, based on users' interests using both, static and real - time data. Through the wayGoo interface, users select conceptual topics that are interesting for them. These topics constitute a browsing behavior vector which is used for learning users' interests implicitly, without being intrusive. Then, the system estimates user preferences and return an events list sorted from the most preferred one to the least. User preferences are modeled via a Naïve Bayesian Network which consists of: a) the `decision' random variable corresponding to users' decision on attending an event, b) the `distance' random variable, modeled by a linear regression that estimates the probability that the distance between a user and each event destination is not discouraging, ` the seat availability' random variable, modeled by a linear regression, which estimates the probability that the seat availability is encouraging d) and the `relevance' random variable, modeled by a clustering - based collaborative filtering, which determines the relevance of each event users' interests. Finally, experimental results show that the proposed system contribute essentially to assisting users in browsing and selecting events to attend.

  14. Slow Freezing or Vitrification of Oocytes: Their Effects on Survival and Meiotic Spindles, and the Time Schedule for Clinical Practice

    Directory of Open Access Journals (Sweden)

    Shee-Uan Chen

    2009-03-01

    Full Text Available Both the slow-freezing method with increased sucrose concentration and new vitrification techniques significantly improve the results of cryopreservation of human oocytes. The recent perfection for vitrification includes the concepts of increase of cooling and warming rates using minimum volume methods, and decrease of toxicity by reducing the concentration of cryoprotectants. In the recent literature, the survival of cryopreserved oocytes ranged from 74% to 90% using the slow-freezing method and from 84% to 99% by vitrification. Overall, the survival rate of oocytes from vitrification (95%, 899/948 appeared higher than that of the slow-freezing method (75%, 1,275/1,683. The microtubules of meiotic spindles are vulnerable to the thermal changes and will depolymerize. After incubation, the microtubules repolymerize. Spindle recovery is faster after vitrification than slow freezing. Even so, after 3 hours of incubation, spindle recuperation is similar between vitrification and slow freezing. Considering both aspects of spindle recovery and oocyte aging, the time schedule for oocyte cryopreservation program makes fertilization in the optimal time. Intracytoplasmic sperm injection is performed for oocytes at 3 hours of post-thaw incubation from the slow-freezing method and 2 hours from vitrification, with restoration of meiotic spindles. The pregnancy potential of cryopreserved oocytes is comparable to that of fresh oocytes or frozen embryos. Cryopreservation of oocytes would importantly contribute to oocyte donation and preservation of fertility for cancer patients.

  15. Influence of dose-time relationship on the pathogenesis of peripheral neuropathy

    International Nuclear Information System (INIS)

    Kogelnik, H.D.; Vienna Univ.

    1977-01-01

    The development of peripheral neutopathies of cranial nerves and of the brachial plexus following curative doses of irradiation is closely related with the total dose applied, the number and size of the individual doses per fraction and the overall time. Additional important factors for the occurrence of these late complications are the volume of tissue irradiated and the stage of disease. In the pathogenesis of peripheral neuropathy a combined effect of different factors seems likely. (orig.) [de

  16. Using RADFET for the real-time measurement of gamma radiation dose rate

    Science.gov (United States)

    Andjelković, Marko S.; Ristić, Goran S.; Jakšić, Aleksandar B.

    2015-02-01

    RADFETs (RADiation sensitive Field Effect Transistors) are integrating ionizing radiation dosimeters operating on the principle of conversion of radiation-induced threshold voltage shift into absorbed dose. However, one of the major drawbacks of RADFETs is the inability to provide the information on the dose rate in real-time using the conventional absorbed dose measurement technique. The real-time monitoring of dose rate and absorbed dose can be achieved with the current mode dosimeters such as PN and PIN diodes/photodiodes, but these dosimeters have some limitations as absorbed dose meters and hence they are often not a suitable replacement for RADFETs. In that sense, this paper investigates the possibility of using the RADFET as a real-time dose rate meter so that it could be applied for simultaneous online measurement of the dose rate and absorbed dose. A RADFET sample, manufactured by Tyndall National Institute, Cork, Ireland, was tested as a dose rate meter under gamma irradiation from a Co-60 source. The RADFET was configured as a PN junction, such that the drain, gate and source terminals were grounded, while the radiation-induced current was measured at the bulk terminal, whereby the bulk was successively biased with 0 , 10 , 20  and 30 V. In zero-bias mode the radiation-induced current was unstable, but in the biased mode the current response was stable for the investigated dose rates from 0.65  to 32.1 Gy h-1 and up to the total absorbed dose of 25 Gy. The current increased with the dose rate in accordance with the power law, whereas the sensitivity of the current read-out was linear with respect to the applied bias voltage. Comparison with previously analyzed PIN photodiodes has shown that the investigated RADFET is competitive with PIN photodiodes as a gamma radiation dose rate meter and therefore has the potential to be employed for the real-time monitoring of the dose rate and absorbed dose.

  17. Using RADFET for the real-time measurement of gamma radiation dose rate

    International Nuclear Information System (INIS)

    Andjelković, Marko S; Ristić, Goran S; Jakšić, Aleksandar B

    2015-01-01

    RADFETs (RADiation sensitive Field Effect Transistors) are integrating ionizing radiation dosimeters operating on the principle of conversion of radiation-induced threshold voltage shift into absorbed dose. However, one of the major drawbacks of RADFETs is the inability to provide the information on the dose rate in real-time using the conventional absorbed dose measurement technique. The real-time monitoring of dose rate and absorbed dose can be achieved with the current mode dosimeters such as PN and PIN diodes/photodiodes, but these dosimeters have some limitations as absorbed dose meters and hence they are often not a suitable replacement for RADFETs. In that sense, this paper investigates the possibility of using the RADFET as a real-time dose rate meter so that it could be applied for simultaneous online measurement of the dose rate and absorbed dose. A RADFET sample, manufactured by Tyndall National Institute, Cork, Ireland, was tested as a dose rate meter under gamma irradiation from a Co-60 source. The RADFET was configured as a PN junction, such that the drain, gate and source terminals were grounded, while the radiation-induced current was measured at the bulk terminal, whereby the bulk was successively biased with 0 , 10 , 20  and 30 V. In zero-bias mode the radiation-induced current was unstable, but in the biased mode the current response was stable for the investigated dose rates from 0.65  to 32.1 Gy h −1 and up to the total absorbed dose of 25 Gy. The current increased with the dose rate in accordance with the power law, whereas the sensitivity of the current read-out was linear with respect to the applied bias voltage. Comparison with previously analyzed PIN photodiodes has shown that the investigated RADFET is competitive with PIN photodiodes as a gamma radiation dose rate meter and therefore has the potential to be employed for the real-time monitoring of the dose rate and absorbed dose. (paper)

  18. Towards real-time topical detection and characterization of FDG dose infiltration prior to PET imaging

    International Nuclear Information System (INIS)

    Williams, Jason M.; Arlinghaus, Lori R.; Rani, Sudheer D.; Shone, Martha D.; Abramson, Vandana G.; Pendyala, Praveen; Chakravarthy, A.B.; Gorge, William J.; Knowland, Joshua G.; Lattanze, Ronald K.; Perrin, Steven R.; Scarantino, Charles W.; Townsend, David W.; Abramson, Richard G.; Yankeelov, Thomas E.

    2016-01-01

    To dynamically detect and characterize "1"8F-fluorodeoxyglucose (FDG) dose infiltrations and evaluate their effects on positron emission tomography (PET) standardized uptake values (SUV) at the injection site and in control tissue. Investigational gamma scintillation sensors were topically applied to patients with locally advanced breast cancer scheduled to undergo limited whole-body FDG-PET as part of an ongoing clinical study. Relative to the affected breast, sensors were placed on the contralateral injection arm and ipsilateral control arm during the resting uptake phase prior to each patient's PET scan. Time-activity curves (TACs) from the sensors were integrated at varying intervals (0-10, 0-20, 0-30, 0-40, and 30-40 min) post-FDG and the resulting areas under the curve (AUCs) were compared to SUVs obtained from PET. In cases of infiltration, observed in three sensor recordings (30 %), the injection arm TAC shape varied depending on the extent and severity of infiltration. In two of these cases, TAC characteristics suggested the infiltration was partially resolving prior to image acquisition, although it was still apparent on subsequent PET. Areas under the TAC 0-10 and 0-20 min post-FDG were significantly different in infiltrated versus non-infiltrated cases (Mann-Whitney, p < 0.05). When normalized to control, all TAC integration intervals from the injection arm were significantly correlated with SUV_p_e_a_k and SUV_m_a_x measured over the infiltration site (Spearman ρ ≥ 0.77, p < 0.05). Receiver operating characteristic (ROC) analyses, testing the ability of the first 10 min of post-FDG sensor data to predict infiltration visibility on the ensuing PET, yielded an area under the ROC curve of 0.92. Topical sensors applied near the injection site provide dynamic information from the time of FDG administration through the uptake period and may be useful in detecting infiltrations regardless of PET image field of view. This dynamic information may also

  19. Towards real-time topical detection and characterization of FDG dose infiltration prior to PET imaging

    Energy Technology Data Exchange (ETDEWEB)

    Williams, Jason M.; Arlinghaus, Lori R. [Vanderbilt University Institute of Imaging Science, Vanderbilt University Medical Center, Nashville, TN (United States); Rani, Sudheer D. [Vanderbilt University Institute of Imaging Science, Vanderbilt University Medical Center, Nashville, TN (United States); Vanderbilt University Medical Center, Department of Radiology and Radiological Sciences, Nashville, TN (United States); Shone, Martha D. [Vanderbilt University Medical Center, Department of Radiology and Radiological Sciences, Nashville, TN (United States); Abramson, Vandana G. [Vanderbilt University Medical Center, Department of Medicine, Nashville, TN (United States); Vanderbilt-Ingram Cancer Center, Nashville, TN (United States); Pendyala, Praveen [Vanderbilt University Medical Center, Department of Radiation Oncology, Nashville, TN (United States); Chakravarthy, A.B. [Vanderbilt-Ingram Cancer Center, Nashville, TN (United States); Vanderbilt University Medical Center, Department of Radiation Oncology, Nashville, TN (United States); Gorge, William J.; Knowland, Joshua G.; Lattanze, Ronald K.; Perrin, Steven R. [Lucerno Dynamics, LLC, Morrisville, NC (United States); Scarantino, Charles W. [Lucerno Dynamics, LLC, Morrisville, NC (United States); University of North Carolina, Department of Radiation Oncology, Chapel Hill, NC (United States); Townsend, David W. [Lucerno Dynamics, LLC, Morrisville, NC (United States); Technology and Research-National University of Singapore, Clinical Imaging Research Centre, Agency for Science, Singapore (Singapore); Abramson, Richard G. [Vanderbilt University Institute of Imaging Science, Vanderbilt University Medical Center, Nashville, TN (United States); Vanderbilt University Medical Center, Department of Radiology and Radiological Sciences, Nashville, TN (United States); Vanderbilt-Ingram Cancer Center, Nashville, TN (United States); Yankeelov, Thomas E. [The University of Texas at Austin, Institute for Computational and Engineering Sciences, and Departments of Biomedical Engineering and Internal Medicine, Austin, TX (United States)

    2016-12-15

    To dynamically detect and characterize {sup 18}F-fluorodeoxyglucose (FDG) dose infiltrations and evaluate their effects on positron emission tomography (PET) standardized uptake values (SUV) at the injection site and in control tissue. Investigational gamma scintillation sensors were topically applied to patients with locally advanced breast cancer scheduled to undergo limited whole-body FDG-PET as part of an ongoing clinical study. Relative to the affected breast, sensors were placed on the contralateral injection arm and ipsilateral control arm during the resting uptake phase prior to each patient's PET scan. Time-activity curves (TACs) from the sensors were integrated at varying intervals (0-10, 0-20, 0-30, 0-40, and 30-40 min) post-FDG and the resulting areas under the curve (AUCs) were compared to SUVs obtained from PET. In cases of infiltration, observed in three sensor recordings (30 %), the injection arm TAC shape varied depending on the extent and severity of infiltration. In two of these cases, TAC characteristics suggested the infiltration was partially resolving prior to image acquisition, although it was still apparent on subsequent PET. Areas under the TAC 0-10 and 0-20 min post-FDG were significantly different in infiltrated versus non-infiltrated cases (Mann-Whitney, p < 0.05). When normalized to control, all TAC integration intervals from the injection arm were significantly correlated with SUV{sub peak} and SUV{sub max} measured over the infiltration site (Spearman ρ ≥ 0.77, p < 0.05). Receiver operating characteristic (ROC) analyses, testing the ability of the first 10 min of post-FDG sensor data to predict infiltration visibility on the ensuing PET, yielded an area under the ROC curve of 0.92. Topical sensors applied near the injection site provide dynamic information from the time of FDG administration through the uptake period and may be useful in detecting infiltrations regardless of PET image field of view. This dynamic information

  20. Scheduling whole-air samples above the Trade Wind Inversion from SUAS using real-time sensors

    Science.gov (United States)

    Freer, J. E.; Greatwood, C.; Thomas, R.; Richardson, T.; Brownlow, R.; Lowry, D.; MacKenzie, A. R.; Nisbet, E. G.

    2015-12-01

    Small Unmanned Air Systems (SUAS) are increasingly being used in science applications for a range of applications. Here we explore their use to schedule the sampling of air masses up to 2.5km above ground using computer controlled bespoked Octocopter platforms. Whole-air sampling is targeted above, within and below the Trade Wind Inversion (TWI). On-board sensors profiled the TWI characteristics in real time on ascent and, hence, guided the altitudes at which samples were taken on descent. The science driver for this research is investigation of the Southern Methane Anomaly and, more broadly, the hemispheric-scale transport of long-lived atmospheric tracers in the remote troposphere. Here we focus on the practical application of SUAS for this purpose. Highlighting the need for mission planning, computer control, onboard sensors and logistics in deploying such technologies for out of line-of-sight applications. We show how such a platform can be deployed successfully, resulting in some 60 sampling flights within a 10 day period. Challenges remain regarding the deployment of such platforms routinely and cost-effectively, particularly regarding training and support. We present some initial results from the methane sampling and its implication for exploring and understanding the Southern Methane Anomaly.

  1. Real-time dose compensation methods for scanned ion beam therapy of moving tumors

    International Nuclear Information System (INIS)

    Luechtenborg, Robert

    2012-01-01

    Scanned ion beam therapy provides highly tumor-conformal treatments. So far, only tumors showing no considerable motion during therapy have been treated as tumor motion and dynamic beam delivery interfere, causing dose deteriorations. One proposed technique to mitigate these deteriorations is beam tracking (BT), which adapts the beam position to the moving tumor. Despite application of BT, dose deviations can occur in the case of non-translational motion. In this work, real-time dose compensation combined with beam tracking (RDBT) has been implemented into the control system to compensate these dose changes by adaptation of nominal particle numbers during irradiation. Compared to BT, significantly reduced dose deviations were measured using RDBT. Treatment planning studies for lung cancer patients including the increased biological effectiveness of ions revealed a significantly reduced over-dose level (3/5 patients) as well as significantly improved dose homogeneity (4/5 patients) for RDBT. Based on these findings, real-time dose compensated re-scanning (RDRS) has been proposed that potentially supersedes the technically complex fast energy adaptation necessary for BT and RDBT. Significantly improved conformity compared to re-scanning, i.e., averaging of dose deviations by repeated irradiation, was measured in film irradiations. Simulations comparing RDRS to BT revealed reduced under- and overdoses of the former method.

  2. Minimizing Total Busy Time with Application to Energy-efficient Scheduling of Virtual Machines in IaaS clouds

    OpenAIRE

    Quang-Hung, Nguyen; Thoai, Nam

    2016-01-01

    Infrastructure-as-a-Service (IaaS) clouds have become more popular enabling users to run applications under virtual machines. Energy efficiency for IaaS clouds is still challenge. This paper investigates the energy-efficient scheduling problems of virtual machines (VMs) onto physical machines (PMs) in IaaS clouds along characteristics: multiple resources, fixed intervals and non-preemption of virtual machines. The scheduling problems are NP-hard. Most of existing works on VM placement reduce ...

  3. Alternative Work Schedules: Definitions

    Science.gov (United States)

    Journal of the College and University Personnel Association, 1977

    1977-01-01

    The term "alternative work schedules" encompasses any variation of the requirement that all permanent employees in an organization or one shift of employees adhere to the same five-day, seven-to-eight-hour schedule. This article defines staggered hours, flexible working hours (flexitour and gliding time), compressed work week, the task system, and…

  4. The triangle scheduling problem

    NARCIS (Netherlands)

    Dürr, Christoph; Hanzálek, Zdeněk; Konrad, Christian; Seddik, Yasmina; Sitters, R.A.; Vásquez, Óscar C.; Woeginger, Gerhard

    2017-01-01

    This paper introduces a novel scheduling problem, where jobs occupy a triangular shape on the time line. This problem is motivated by scheduling jobs with different criticality levels. A measure is introduced, namely the binary tree ratio. It is shown that the Greedy algorithm solves the problem to

  5. Changes in tumor cell response due to prolonged dose delivery times in fractionated radiation therapy

    International Nuclear Information System (INIS)

    Paganetti, Harald

    2005-01-01

    Purpose: Dynamic radiation therapy, such as intensity-modulated radiation therapy, delivers more complex treatment fields than conventional techniques. The increased complexity causes longer dose delivery times for each fraction. The cellular damage after a full treatment may depend on the dose rate, because sublethal radiation damage can be repaired more efficiently during prolonged dose delivery. The goal of this study was to investigate the significance of this effect in fractionated radiation therapy. Methods and Materials: The lethal/potentially lethal model was used to calculate lesion induction rates for repairable and nonrepairable lesions. Dose rate effects were analyzed for 9 different cell lines (8 human tumor xenografts and a C3H10T1/2 cell line). The effects of single-fraction as well as fractionated irradiation for different dose rates were studied. Results: Significant differences can be seen for dose rates lower than about 0.1 Gy/min for all cell lines considered. For 60 Gy delivered in 30 fractions, the equivalent dose is reduced by between 1.3% and 12% comparing 2 Gy delivery over 30 min per fraction with 2 Gy delivery over 1 min per fraction. The effect is higher for higher doses per fraction. Furthermore, the results show that dose rate effects do not show a simple correlation with the α/β ratio for ratios between 3 Gy and 31 Gy. Conclusions: If the total dose delivery time for a treatment fraction in radiation therapy increases to about 20 min, a correction for dose rate effects may have to be considered in treatment planning. Adjustments in effective dose may be necessary when comparing intensity-modulated radiation therapy with conventional treatment plans

  6. Studying the potential of point detectors in time-resolved dose verification of dynamic radiotherapy

    International Nuclear Information System (INIS)

    Beierholm, A.R.; Behrens, C.F.; Andersen, C.E.

    2015-01-01

    Modern megavoltage x-ray radiotherapy with high spatial and temporal dose gradients puts high demands on the entire delivery system, including not just the linear accelerator and the multi-leaf collimator, but also algorithms used for optimization and dose calculations, and detectors used for quality assurance and dose verification. In this context, traceable in-phantom dosimetry using a well-characterized point detector is often an important supplement to 2D-based quality assurance methods based on radiochromic film or detector arrays. In this study, an in-house developed dosimetry system based on fiber-coupled plastic scintillator detectors was evaluated and compared with a Farmer-type ionization chamber and a small-volume ionization chamber. An important feature of scintillator detectors is that the sensitive volume of the detector can easily be scaled, and five scintillator detectors of different scintillator length were thus employed to quantify volume averaging effects by direct measurement. The dosimetric evaluation comprised several complex-shape static fields as well as simplified dynamic deliveries using RapidArc, a volumetric-modulated arc therapy modality often used at the participating clinic. The static field experiments showed that the smallest scintillator detectors were in the best agreement with dose calculations, while needing the smallest volume averaging corrections. Concerning total dose measured during RapidArc, all detectors agreed with dose calculations within 1.1 ± 0.7% when positioned in regions of high homogenous dose. Larger differences were observed for high dose gradient and organ at risk locations, were differences between measured and calculated dose were as large as 8.0 ± 5.5%. The smallest differences were generally seen for the small-volume ionization chamber and the smallest scintillators. The time-resolved RapidArc dose profiles revealed volume-dependent discrepancies between scintillator and ionization chamber response

  7. Annual and life-time doses from acute and chronic intakes of 239Pu

    International Nuclear Information System (INIS)

    Bhati, Sharda; Rudran, Kamala

    1994-01-01

    A procedure to estimate annual, committed and life time doses from acute and chronic intakes of a long-lived radionuclide 239 Pu, is described. Annual dose computations, presented for 239 Pu of 5μm activity median aerodynamic diameter (AMAD), takes into account contribution from previous years intakes. Annual limits on intakes (ALI) for W and Y class of 239 Pu are computed as per the new internal dose limitation system of ICRP-61. Life time doses, corresponding to chronic intakes of 1 ALI/y for working periods of 40 and 50 years are presented for life span of 70 years of a radiation worker. These results are useful in assigning annual doses for occupational workers handling 239 Pu. (author). 5 refs., 2 tabs

  8. The database system of the real-time dose appreciation for Qinshan Nuclear Power Plant

    International Nuclear Information System (INIS)

    Jiang Li; Chai Luquan

    1993-01-01

    The paper is about the data base system of the real-time dose appreciation for Qinshan Nuclear Power Plant and describes in detail the design of the system, the data structure, the programming and the characteristics

  9. A Novel Molten Salt Reactor Concept to Implement the Multi-Step Time-Scheduled Transmutation Strategy

    International Nuclear Information System (INIS)

    Csom, Gyula; Feher, Sandor; Szieberthj, Mate

    2002-01-01

    Nowadays the molten salt reactor (MSR) concept seems to revive as one of the most promising systems for the realization of transmutation. In the molten salt reactors and subcritical systems the fuel and material to be transmuted circulate dissolved in some molten salt. The main advantage of this reactor type is the possibility of the continuous feed and reprocessing of the fuel. In the present paper a novel molten salt reactor concept is introduced and its transmutation capabilities are studied. The goal is the development of a transmutation technique along with a device implementing it, which yield higher transmutation efficiencies than that of the known procedures and thus results in radioactive waste whose load on the environment is reduced both in magnitude and time length. The procedure is the multi-step time-scheduled transmutation, in which transformation is done in several consecutive steps of different neutron flux and spectrum. In the new MSR concept, named 'multi-region' MSR (MRMSR), the primary circuit is made up of a few separate loops, in which salt-fuel mixtures of different compositions are circulated. The loop sections constituting the core region are only neutronically and thermally coupled. This new concept makes possible the utilization of the spatial dependence of spectrum as well as the advantageous features of liquid fuel such as the possibility of continuous chemical processing etc. In order to compare a 'conventional' MSR and a proposed MRMSR in terms of efficiency, preliminary calculational results are shown. Further calculations in order to find the optimal implementation of this new concept and to emphasize its other advantageous features are going on. (authors)

  10. In vitro effect of hemodilution on activated clotting time and high-dose thrombin time during cardiopulmonary bypass

    NARCIS (Netherlands)

    Huyzen, RJ; vanOeveren, W; Wei, FY; Stellingwerf, P; Boonstra, PW; Gu, YJ

    Background. Extreme dilution of clotting factors, as may occur during pediatric or neonatal cardiopulmonary bypass, often leads to inadequate monitoring of anticoagulation with activated dotting time (ACT). In this study we postulate that the high-dose thrombin time (HiTT) is less influenced by

  11. Experiment of aerosol-release time for a novel automatic metered dose inhaler

    Directory of Open Access Journals (Sweden)

    Mingrong Zhang

    2016-05-01

    Full Text Available The objective of this study was to evaluate the aerosol-release time in the development of a new automatic adapter for metered dose inhaler. With this device, regular manually operated metered dose inhalers become automatic. During the study, an inhalation simulator was designed and tested with the newly developed mechatronic system. By adjusting the volume and the pressure of the vacuum tank, most human inhalation waveforms were able to simulate. As an example, regular quick-deep and slow-deep waveforms were matched within reasonable accuracy. Finally, with the help of dynamic image processing, the aerosol-release time (Tr was carefully measured and fully discussed, including the switch-on time (Ts, the mechatronics-hysteresis (Tm and the intentional-delay (Ti. Under slow-deep inhalation condition which is suitable for metered dose inhaler medicine delivery, the switch-on flow-rate could reach as low as 10 L/min, and the corresponding switch-on time was approximately 0.20 s. While the mechatronics-hysteresis depended on the brand of metered dose inhaler, assuming there was no intentional-delay, the aerosol-release time could be as low as 0.40 and 0.60 s, respectively, for two commercially available metered dose inhalers studied in this article. Therefore, this newly developed mechatronic adapter system could ensure aerosol-release time (Tr within satisfactory range for metered dose inhalers.

  12. T3 glottic cancer: an analysis of dose time-volume factors

    International Nuclear Information System (INIS)

    Harwood, A.R.; Beale, F.A.; Cummings, B.J.; Hawkins, N.V.; Keane, T.J.; Rider, W.D.

    1980-01-01

    This report analyzes dose-time-volume factors in 112 patients with T3N0M0 glottic cancer who were treated with radical radiotherapy with surgery for salvage between 1963 and 1977. 55% of the patients are alive and well 5 years following treatment; 26% died of glottic cancer and 19% died of intercurrent disease. In the 1965 to 1969 time period, 31% died of tumor as compared to 16% in the 1975 to 1977 time period. Overall local control by radiotherapy was 51%; 2/3 of the failures were surgically salvaged. 44% were locally controlled by radiotherapy in the 1965 to 1969 time period and 57% in the 1975 to 1977 time period. Analysis of dose-time-volume factors reveals that the optimal dose is greater than 1700 ret and a minimal volume of 6 x 8 cm should be used. A dose-cure curve for T3 glottic cancer is constructed and compared with the dose complication curve for the larynx and the dose-cure curve for T1N0M0 glottic cancer. A comparison of cure rates between 112 patients treated with radical radiotherapy and surgery for salvage versus 28 patients treated with combined pre-operative irradiation and surgery reveals no difference in the proportion of patients who died of glottic cancer or in the number of patients alive at 5 years following treatment

  13. A multi-GPU real-time dose simulation software framework for lung radiotherapy.

    Science.gov (United States)

    Santhanam, A P; Min, Y; Neelakkantan, H; Papp, N; Meeks, S L; Kupelian, P A

    2012-09-01

    Medical simulation frameworks facilitate both the preoperative and postoperative analysis of the patient's pathophysical condition. Of particular importance is the simulation of radiation dose delivery for real-time radiotherapy monitoring and retrospective analyses of the patient's treatment. In this paper, a software framework tailored for the development of simulation-based real-time radiation dose monitoring medical applications is discussed. A multi-GPU-based computational framework coupled with inter-process communication methods is introduced for simulating the radiation dose delivery on a deformable 3D volumetric lung model and its real-time visualization. The model deformation and the corresponding dose calculation are allocated among the GPUs in a task-specific manner and is performed in a pipelined manner. Radiation dose calculations are computed on two different GPU hardware architectures. The integration of this computational framework with a front-end software layer and back-end patient database repository is also discussed. Real-time simulation of the dose delivered is achieved at once every 120 ms using the proposed framework. With a linear increase in the number of GPU cores, the computational time of the simulation was linearly decreased. The inter-process communication time also improved with an increase in the hardware memory. Variations in the delivered dose and computational speedup for variations in the data dimensions are investigated using D70 and D90 as well as gEUD as metrics for a set of 14 patients. Computational speed-up increased with an increase in the beam dimensions when compared with a CPU-based commercial software while the error in the dose calculation was lung model-based radiotherapy is an effective tool for performing both real-time and retrospective analyses.

  14. Interactive dose shaping - efficient strategies for CPU-based real-time treatment planning

    International Nuclear Information System (INIS)

    Ziegenhein, P; Kamerling, C P; Oelfke, U

    2014-01-01

    Conventional intensity modulated radiation therapy (IMRT) treatment planning is based on the traditional concept of iterative optimization using an objective function specified by dose volume histogram constraints for pre-segmented VOIs. This indirect approach suffers from unavoidable shortcomings: i) The control of local dose features is limited to segmented VOIs. ii) Any objective function is a mathematical measure of the plan quality, i.e., is not able to define the clinically optimal treatment plan. iii) Adapting an existing plan to changed patient anatomy as detected by IGRT procedures is difficult. To overcome these shortcomings, we introduce the method of Interactive Dose Shaping (IDS) as a new paradigm for IMRT treatment planning. IDS allows for a direct and interactive manipulation of local dose features in real-time. The key element driving the IDS process is a two-step Dose Modification and Recovery (DMR) strategy: A local dose modification is initiated by the user which translates into modified fluence patterns. This also affects existing desired dose features elsewhere which is compensated by a heuristic recovery process. The IDS paradigm was implemented together with a CPU-based ultra-fast dose calculation and a 3D GUI for dose manipulation and visualization. A local dose feature can be implemented via the DMR strategy within 1-2 seconds. By imposing a series of local dose features, equal plan qualities could be achieved compared to conventional planning for prostate and head and neck cases within 1-2 minutes. The idea of Interactive Dose Shaping for treatment planning has been introduced and first applications of this concept have been realized.

  15. Dose-Time Relations for Induction of Lung Cancer in Uranium Miners

    Energy Technology Data Exchange (ETDEWEB)

    Blair, H. A. [University of Rochester School of Medicine and Dentistry, Rochester, NY (United States)

    1969-11-15

    Lack of data on the concentration of radon and daughters in the air inhaled by uranium miners has made it difficult in the past to establish radiation dose and time factors for induction of lung cancer. Recent determinations by others of {sup 210}Pb in the bones of miners who died of cancer provide, however, a new approach. Because {sup 210}Pb, a decay product of radon, accumulates in bone but is also excreted, its concentration, after prolonged exposure, will approach an equilibrium which is a measure of the rate of exposure. It is shown that the {sup 210}Pb. levels in bone at the end of mining are as closely proportional to existing measured and estimated exposure rates to radon as can be expected. It is reasonable, therefore, to use {sup 210}Pb levels in bone as measures of prior exposure rates. When this is done a graph of survival times from beginning of exposures against reciprocal of {sup 210}Pb shows that lung cancer in man exhibits the two types, early and late, previously revealed in bone cancer in dogs and skin cancer in rats. When the dose is high, death follows initiation of cancer in about 7 years. When the dose is low, the usual case, there is an additional latency of 16 years so the time from attainment of initiating dose to death is 23 years. The initiating dose for the high dose type is about 65 pCi {sup 210}Pb per gram years and for the low dose type about 10 pCi per gram years which, in terms of exposure, is about 400 working level months, WLM, as working level, WL, is currently defined. Of the derived parameters the total low dose development time of 23 years is fairly accurate. The high dose development time of 7 years is less certain. The initiating low dose of 10 pCi per gram years is probably moderately accurate, but its counterpart of 400 WLM less certain. The high initiating dose is poorly determined. Twenty three lung cancer cases were involved in this study. Additional cases along with additional environmental and other measurements

  16. Methods and time schedule for follow-up of intracranial aneurysms treated with endovascular embolization: a systematic review.

    Science.gov (United States)

    Serafin, Zbigniew; Strześniewski, Piotr; Lasek, Władysław; Beuth, Wojciech

    2011-01-01

    To review the diagnostic value of angiographic methods and the optimal timetable for follow-up imaging of patients after endovascular treatment of intracranial aneurysms. A comprehensive computer-aided search for relevant primary papers was performed using the MEDLINE, PubMed, Embase, and Cochrane Collaboration database from January 1991 to March 2011. Original papers were included that reported either diagnostic value of angiographic modalities for follow-up vs. digital subtracted angiography (DSA) or comparison of aneurysm occlusion rate in delayed vs. early follow-up. The systematic review identified 35 relevant studies: 3 on the diagnostic value of three-dimensional (3D) DSA, 30 on the performance of magnetic resonance angiography (MRA), and 3 on time schedules for follow-up. 3D DSA had sensitivity of 100%, and specificity of 58.3-94.7%. Magnetic resonance angiography had sensitivity of 28.4-100%, and specificity of 50.0-100%. The proportion of aneurysms that recanalized between the early follow-up examination at 6 months and the delayed imaging at 1.5-6.0 years was 0-2.5%. Magnetic resonance angiography seems to be the best imaging method for the follow-up. In selected cases, when invasive angiography is necessary, 3D DSA should be considered to improve the diagnostic accuracy. Most patients who present with stable and adequate aneurysm occlusion at 6 months after coiling may not require further follow-up. Key words: intracranial aneurysm, embolization, coils, digital subtracted angiography, magnetic resonance, computed tomography.

  17. Basic evaluation of signal transmission in a real-time internal radiation dose measurement system

    International Nuclear Information System (INIS)

    Shinohe, K.; Takura, T.; Sato, F.; Matsuki, H.; Yamada, S.; Sato, T.

    2009-01-01

    In radiation therapy, excessive exposure to radiation occurs because the dose actually delivered to the tumor is not known. As a result, a patient suffers from side effects. To solve this problem, a system is needed in which the delivered dose is measured inside the body and the dose data are transmitted from inside to outside of the body during radiation therapy. If such a system is realized, it will be possible to treat cancer safely and effectively. The proposed real-time internal radiation dose measurement system consists of an implantable dosimeter, a wireless communication system, and a wireless feeding system. In this study, a wireless communication system that uses magnetic fields was investigated. As a result, a communication distance of 200 mm was obtained. It was confirmed that radiation dose data could be transmitted outside the body when the communication distance is the required 200 mm. (author)

  18. An Integer Batch Scheduling Model for a Single Machine with Simultaneous Learning and Deterioration Effects to Minimize Total Actual Flow Time

    Science.gov (United States)

    Yusriski, R.; Sukoyo; Samadhi, T. M. A. A.; Halim, A. H.

    2016-02-01

    In the manufacturing industry, several identical parts can be processed in batches, and setup time is needed between two consecutive batches. Since the processing times of batches are not always fixed during a scheduling period due to learning and deterioration effects, this research deals with batch scheduling problems with simultaneous learning and deterioration effects. The objective is to minimize total actual flow time, defined as a time interval between the arrival of all parts at the shop and their common due date. The decision variables are the number of batches, integer batch sizes, and the sequence of the resulting batches. This research proposes a heuristic algorithm based on the Lagrange Relaxation. The effectiveness of the proposed algorithm is determined by comparing the resulting solutions of the algorithm to the respective optimal solution obtained from the enumeration method. Numerical experience results show that the average of difference among the solutions is 0.05%.

  19. An Integer Batch Scheduling Model for a Single Machine with Simultaneous Learning and Deterioration Effects to Minimize Total Actual Flow Time

    International Nuclear Information System (INIS)

    Yusriski, R; Sukoyo; Samadhi, T M A A; Halim, A H

    2016-01-01

    In the manufacturing industry, several identical parts can be processed in batches, and setup time is needed between two consecutive batches. Since the processing times of batches are not always fixed during a scheduling period due to learning and deterioration effects, this research deals with batch scheduling problems with simultaneous learning and deterioration effects. The objective is to minimize total actual flow time, defined as a time interval between the arrival of all parts at the shop and their common due date. The decision variables are the number of batches, integer batch sizes, and the sequence of the resulting batches. This research proposes a heuristic algorithm based on the Lagrange Relaxation. The effectiveness of the proposed algorithm is determined by comparing the resulting solutions of the algorithm to the respective optimal solution obtained from the enumeration method. Numerical experience results show that the average of difference among the solutions is 0.05%. (paper)

  20. Center of cancer systems biology second annual workshop--tumor metronomics: timing and dose level dynamics.

    Science.gov (United States)

    Hahnfeldt, Philip; Hlatky, Lynn; Klement, Giannoula Lakka

    2013-05-15

    Metronomic chemotherapy, the delivery of doses in a low, regular manner so as to avoid toxic side effects, was introduced over 12 years ago in the face of substantial clinical and preclinical evidence supporting its tumor-suppressive capability. It constituted a marked departure from the classic maximum-tolerated dose (MTD) strategy, which, given its goal of rapid eradication, uses dosing sufficiently intense to require rest periods between cycles to limit toxicity. Even so, upfront tumor eradication is frequently not achieved with MTD, whereupon a de facto goal of longer-term tumor control is often pursued. As metronomic dosing has shown tumor control capability, even for cancers that have become resistant to the same drug delivered under MTD, the question arises whether it may be a preferable alternative dosing approach from the outset. To date, however, our knowledge of the coupled dynamics underlying metronomic dosing is neither sufficiently well developed nor widely enough disseminated to establish its actual potential. Meeting organizers thus felt the time was right, armed with new quantitative approaches, to call a workshop on "Tumor Metronomics: Timing and Dose Level Dynamics" to explore prospects for gaining a deeper, systems-level appreciation of the metronomics concept. The workshop proved to be a forum in which experts from the clinical, biologic, mathematical, and computational realms could work together to clarify the principles and underpinnings of metronomics. Among other things, the need for significant shifts in thinking regarding endpoints to be used as clinical standards of therapeutic progress was recognized. ©2013 AACR.

  1. Real-time dose calculation and visualization for the proton therapy of ocular tumours

    Energy Technology Data Exchange (ETDEWEB)

    Pfeiffer, Karsten [Medizinische Physik, Deutsches Krebsforschungszentrum, INF 280, D-69120 Heidelberg (Germany). E-mail: k.pfeiffer at dkfz.de; Bendl, Rolf [Medizinische Physik, Deutsches Krebsforschungszentrum, INF 280, D-69120 Heidelberg (Germany). E-mail: r.bendl at dkfz.de

    2001-03-01

    A new real-time dose calculation and visualization was developed as part of the new 3D treatment planning tool OCTOPUS for proton therapy of ocular tumours within a national research project together with the Hahn-Meitner Institut Berlin. The implementation resolves the common separation between parameter definition, dose calculation and evaluation and allows a direct examination of the expected dose distribution while adjusting the treatment parameters. The new tool allows the therapist to move the desired dose distribution under visual control in 3D to the appropriate place. The visualization of the resulting dose distribution as a 3D surface model, on any 2D slice or on the surface of specified ocular structures is done automatically when adapting parameters during the planning process. In addition, approximate dose volume histograms may be calculated with little extra time. The dose distribution is calculated and visualized in 200 ms with an accuracy of 6% for the 3D isodose surfaces and 8% for other objects. This paper discusses the advantages and limitations of this new approach. (author)

  2. A novel time dependent gamma evaluation function for dynamic 2D and 3D dose distributions

    International Nuclear Information System (INIS)

    Podesta, Mark; Persoon, Lucas CGG; Verhaegen, Frank

    2014-01-01

    Modern external beam radiotherapy requires detailed verification and quality assurance so that confidence can be placed on both the delivery of a single treatment fraction and on the consistency of delivery throughout the treatment course. To verify dose distributions, a comparison between prediction and measurement must be made. Comparisons between two dose distributions are commonly performed using a Gamma evaluation which is a calculation of two quantities on a pixel by pixel basis; the dose difference, and the distance to agreement. By providing acceptance criteria (e.g. 3%, 3 mm), the function will find the most appropriate match within its two degrees of freedom. For complex dynamic treatments such as IMRT or VMAT it is important to verify the dose delivery in a time dependent manner and so a gamma evaluation that includes a degree of freedom in the time domain via a third parameter, time to agreement, is presented here. A C++ (mex) based gamma function was created that could be run on either CPU and GPU computing platforms that would allow a degree of freedom in the time domain. Simple test cases were created in both 2D and 3D comprising of simple geometrical shapes with well-defined boundaries varying over time. Changes of varying magnitude in either space or time were introduced and repeated gamma analyses were performed varying the criteria. A clinical VMAT case was also included, artificial air bubbles of varying size were introduced to a patient geometry, along with shifts of varying magnitude in treatment time. For all test cases where errors in distance, dose or time were introduced, the time dependent gamma evaluation could accurately highlight the errors. The time dependent gamma function presented here allows time to be included as a degree of freedom in gamma evaluations. The function allows for 2D and 3D data sets which are varying over time to be compared using appropriate criteria without penalising minor offsets of subsequent radiation

  3. Real-time measurement and monitoring of absorbed dose for electron beams

    Science.gov (United States)

    Korenev, Sergey; Korenev, Ivan; Rumega, Stanislav; Grossman, Leon

    2004-09-01

    The real-time method and system for measurement and monitoring of absorbed dose for industrial and research electron accelerators is considered in the report. The system was created on the basis of beam parameters method. The main concept of this method consists in the measurement of dissipated kinetic energy of electrons in the irradiated product, determination of number of electrons and mass of irradiated product in the same cell by following calculation of absorbed dose in the cell. The manual and automation systems for dose measurements are described. The systems are acceptable for all types of electron accelerators.

  4. Real-time measurement and monitoring of absorbed dose for electron beams

    Energy Technology Data Exchange (ETDEWEB)

    Korenev, Sergey E-mail: sergey_korenev@steris.com; Korenev, Ivan; Rumega, Stanislav; Grossman, Leon

    2004-10-01

    The real-time method and system for measurement and monitoring of absorbed dose for industrial and research electron accelerators is considered in the report. The system was created on the basis of beam parameters method. The main concept of this method consists in the measurement of dissipated kinetic energy of electrons in the irradiated product, determination of number of electrons and mass of irradiated product in the same cell by following calculation of absorbed dose in the cell. The manual and automation systems for dose measurements are described. The systems are acceptable for all types of electron accelerators.

  5. Real-time measurement and monitoring of absorbed dose for electron beams

    International Nuclear Information System (INIS)

    Korenev, Sergey; Korenev, Ivan; Rumega, Stanislav; Grossman, Leon

    2004-01-01

    The real-time method and system for measurement and monitoring of absorbed dose for industrial and research electron accelerators is considered in the report. The system was created on the basis of beam parameters method. The main concept of this method consists in the measurement of dissipated kinetic energy of electrons in the irradiated product, determination of number of electrons and mass of irradiated product in the same cell by following calculation of absorbed dose in the cell. The manual and automation systems for dose measurements are described. The systems are acceptable for all types of electron accelerators

  6. Radiobiological evaluation of the radiation dose as used in high-precision radiotherapy. Effect of prolonged delivery time and applicability of the linear-quadratic model

    International Nuclear Information System (INIS)

    Shibamoto, Yuta; Otsuka, Shinya; Iwata, Hiromitsu; Sugie, Chikao; Ogino, Hiroyuki; Tomita, Natsuo

    2012-01-01

    Since the dose delivery pattern in high-precision radiotherapy is different from that in conventional radiation, radiobiological assessment of the physical dose used in stereotactic irradiation and intensity-modulated radiotherapy has become necessary. In these treatments, the daily dose is usually given intermittently over a time longer than that used in conventional radiotherapy. During prolonged radiation delivery, sublethal damage repair takes place, leading to the decreased effect of radiation. This phenomenon is almost universarily observed in vitro. In in vivo tumors, however, this decrease in effect can be counterbalanced by rapid reoxygenation, which has been demonstrated in a laboratory study. Studies on reoxygenation in human tumors are warranted to better evaluate the influence of prolonged radiation delivery. Another issue related to radiosurgery and hypofractionated stereotactic radiotherapy is the mathematical model for dose evaluation and conversion. Many clinicians use the linear-quadratic (LQ) model and biologically effective dose (BED) to estimate the effects of various radiation schedules, but it has been suggested that the LQ model is not applicable to high doses per fraction. Recent experimental studies verified the inadequacy of the LQ model in converting hypofractionated doses into single doses. The LQ model overestimates the effect of high fractional doses of radiation. BED is particularly incorrect when it is used for tumor responses in vivo, since it does not take reoxygenation into account. For normal tissue responses, improved models have been proposed, but, for in vivo tumor responses, the currently available models are not satisfactory, and better ones should be proposed in future studies. (author)

  7. Energy Efficient Real-Time Scheduling Using DPM on Mobile Sensors with a Uniform Multi-Cores

    Directory of Open Access Journals (Sweden)

    Youngmin Kim

    2017-12-01

    Full Text Available In wireless sensor networks (WSNs, sensor nodes are deployed for collecting and analyzing data. These nodes use limited energy batteries for easy deployment and low cost. The use of limited energy batteries is closely related to the lifetime of the sensor nodes when using wireless sensor networks. Efficient-energy management is important to extending the lifetime of the sensor nodes. Most effort for improving power efficiency in tiny sensor nodes has focused mainly on reducing the power consumed during data transmission. However, recent emergence of sensor nodes equipped with multi-cores strongly requires attention to be given to the problem of reducing power consumption in multi-cores. In this paper, we propose an energy efficient scheduling method for sensor nodes supporting a uniform multi-cores. We extend the proposed T-Ler plane based scheduling for global optimal scheduling of a uniform multi-cores and multi-processors to enable power management using dynamic power management. In the proposed approach, processor selection for a scheduling and mapping method between the tasks and processors is proposed to efficiently utilize dynamic power management. Experiments show the effectiveness of the proposed approach compared to other existing methods.

  8. Modeling duration choice in space–time multi-state supernetworks for individual activity-travel scheduling

    NARCIS (Netherlands)

    Liao, F.

    2016-01-01

    Multi-state supernetworks have been advanced recently for modeling individual activity-travel scheduling decisions. The main advantage is that multi-dimensional choice facets are modeled simultaneously within an integral framework, supporting systematic assessments of a large spectrum of policies

  9. A modified genetic algorithm for time and cost optimization of an additive manufacturing single-machine scheduling

    Directory of Open Access Journals (Sweden)

    M. Fera

    2018-09-01

    Full Text Available Additive Manufacturing (AM is a process of joining materials to make objects from 3D model data, usually layer by layer, as opposed to subtractive manufacturing methodologies. Selective Laser Melting, commercially known as Direct Metal Laser Sintering (DMLS®, is the most diffused additive process in today’s manufacturing industry. Introduction of a DMLS® machine in a production department has remarkable effects not only on industrial design but also on production planning, for example, on machine scheduling. Scheduling for a traditional single machine can employ consolidated models. Scheduling of an AM machine presents new issues because it must consider the capability of producing different geometries, simultaneously. The aim of this paper is to provide a mathematical model for an AM/SLM machine scheduling. The complexity of the model is NP-HARD, so possible solutions must be found by metaheuristic algorithms, e.g., Genetic Algorithms. Genetic Algorithms solve sequential optimization problems by handling vectors; in the present paper, we must modify them to handle a matrix. The effectiveness of the proposed algorithms will be tested on a test case formed by a 30 Part Number production plan with a high variability in complexity, distinct due dates and low production volumes.

  10. Experiment of aerosol-release time for a novel automatic metered dose inhaler

    OpenAIRE

    Mingrong Zhang; Songhao Wang; Yu-Ching Yang

    2016-01-01

    The objective of this study was to evaluate the aerosol-release time in the development of a new automatic adapter for metered dose inhaler. With this device, regular manually operated metered dose inhalers become automatic. During the study, an inhalation simulator was designed and tested with the newly developed mechatronic system. By adjusting the volume and the pressure of the vacuum tank, most human inhalation waveforms were able to simulate. As an example, regular quick-deep and slow-de...

  11. Effect of processing time delay on the dose response of Kodak EDR2 film.

    Science.gov (United States)

    Childress, Nathan L; Rosen, Isaac I

    2004-08-01

    Kodak EDR2 film is a widely used two-dimensional dosimeter for intensity modulated radiotherapy (IMRT) measurements. Our clinical use of EDR2 film for IMRT verifications revealed variations and uncertainties in dose response that were larger than expected, given that we perform film calibrations for every experimental measurement. We found that the length of time between film exposure and processing can affect the absolute dose response of EDR2 film by as much as 4%-6%. EDR2 films were exposed to 300 cGy using 6 and 18 MV 10 x 10 cm2 fields and then processed after time delays ranging from 2 min to 24 h. An ion chamber measured the relative dose for these film exposures. The ratio of optical density (OD) to dose stabilized after 3 h. Compared to its stable value, the film response was 4%-6% lower at 2 min and 1% lower at 1 h. The results of the 4 min and 1 h processing time delays were verified with a total of four different EDR2 film batches. The OD/dose response for XV2 films was consistent for time periods of 4 min and 1 h between exposure and processing. To investigate possible interactions of the processing time delay effect with dose, single EDR2 films were irradiated to eight different dose levels between 45 and 330 cGy using smaller 3 x 3 cm2 areas. These films were processed after time delays of 1, 3, and 6 h, using 6 and 18 MV photon qualities. The results at all dose levels were consistent, indicating that there is no change in the processing time delay effect for different doses. The difference in the time delay effect between the 6 and 18 MV measurements was negligible for all experiments. To rule out bias in selecting film regions for OD measurement, we compared the use of a specialized algorithm that systematically determines regions of interest inside the 10 x 10 cm2 exposure areas to manually selected regions of interest. There was a maximum difference of only 0.07% between the manually and automatically selected regions, indicating that the use of

  12. Safety, dose, and timing of reteplase in treating occluded central venous catheters in children with cancer.

    Science.gov (United States)

    Terrill, Kelly R; Lemons, Richard S; Goldsby, Robert E

    2003-11-01

    Recombinant tissue plasminogen activator, alteplase, began to be commonly used to restore the patency of occluded central venous catheters (CVCs) as urokinase production was halted in the late 1990s. However, alteplase often requires an extended dwell time to restore patency to occluded CVCs. In adults, reteplase, a newer thrombolytic agent, has been reported to restore patency to CVCs in 30 minutes. The authors prospectively evaluated the safety and efficacy of reteplase in restoring patency to occluded CVCs in children with cancer. This was a dose escalation trial. The dose of reteplase was initiated at 0.1 units and increased by increments of 0.1 units to a maximum dose of 0.4 units. Each dose was tested on at least three participants. Time to patency after reteplase administration was recorded by nurses caring for the patients. Attempts to access the line occurred every 15 minutes for 1 hour. CVCs that remained occluded after 1 hour were treated with alteplase. Reteplase was administered to 15 clotted CVCs. Twelve of the 15 were cleared with an average dwell time of 38 minutes. The time to patency did not appear to correlate with the dose. No adverse events were reported. Reteplase can restore patency to occluded CVCs in a pediatric population. Reteplase appears to have comparable efficacy with alteplase, but reteplase may require shorter dwell times. A prospective, randomized, clinical trial is warranted to determine whether reteplase is as effective as alteplase in restoring patency to occluded CVCs.

  13. Occlusion-amblyopia following high dose oral levodopa combined with part time patching

    OpenAIRE

    Mihir Kothari

    2014-01-01

    Part time occlusion therapy is not reported to cause occlusion (reverse) amblyopia. However, when combined with high dose oral levodopa, an increase in the plasticity of the visual cortex can lead to occlusion amblyopia. In this case report, we describe a six year old child who developed occlusion amblyopia following part time patching combined with oral levodopa.

  14. Occlusion-amblyopia following high dose oral levodopa combined with part time patching.

    Science.gov (United States)

    Kothari, Mihir

    2014-12-01

    Part time occlusion therapy is not reported to cause occlusion (reverse) amblyopia. However, when combined with high dose oral levodopa, an increase in the plasticity of the visual cortex can lead to occlusion amblyopia. In this case report, we describe a six year old child who developed occlusion amblyopia following part time patching combined with oral levodopa.

  15. Occlusion-amblyopia following high dose oral levodopa combined with part time patching

    Directory of Open Access Journals (Sweden)

    Mihir Kothari

    2014-01-01

    Full Text Available Part time occlusion therapy is not reported to cause occlusion (reverse amblyopia. However, when combined with high dose oral levodopa, an increase in the plasticity of the visual cortex can lead to occlusion amblyopia. In this case report, we describe a six year old child who developed occlusion amblyopia following part time patching combined with oral levodopa.

  16. Dose-response association between leisure time physical activity and work ability

    DEFF Research Database (Denmark)

    Calatayud, Joaquin; Jakobsen, Markus D.; Sundstrup, Emil

    2015-01-01

    INTRODUCTION: Regular physical activity is important for longevity and health, but knowledge about the optimal dose of physical activity for maintaining good work ability is unknown. This study investigates the association between intensity and duration of physical activity during leisure time......, lifestyle and chronic disease showed that the duration of high-intensity physical activity during leisure was positively associated with work ability, in a dose-response fashion (p physical activity per week had on average 8 points higher work ability...... than those not performing such activities. The duration of low-intensity leisure-time physical activity was not associated with work ability (p = 0.5668). CONCLUSIONS: The duration of high-intensity physical activity during leisure time is associated in a dose-response fashion with work ability...

  17. Radiation retinopathy after external-beam irradiation: Analysis of time-dose factors

    International Nuclear Information System (INIS)

    Parsons, J.T.; Bova, F.J.; Mendenhall, W.M.

    1994-01-01

    To investigate the risk of radiation-induced retinopathy according to total radiation dose and fraction size, based on both retorspective and prospectively collected data. Between October 1964 and May 1989, 68 retinae in 64 patients received fractionated external-beam irradiation during the treatment of primary extracranial head and neck tumors. All patients had a minimum of 3 years of ophthalmologic follow-up (range, 3 to 26 years; mean, 9 years; median, 8 years). Twenty-seven eyes in 26 patients developed radiation retinopathy resulting in visual acuity of 20/200 or worse. The mean and median times to the onset of symptoms attributable to retinal ischemia were 2.8 and 2.5 years, respectively. Fourteen of the injured eyes developed rubeosis iridis and/or neovascular glaucoma. Radiation retinopathy was not observed at doses below 45 Gy, but increased steadily in incidence at doses ≥45Gy. In the range of doses between 45 and 55 Gy, there was an increased risk of injury among patients who received doses per fraction of ≥1.9Gy (p - .09). There was also a trend toward increased risk of injury among patients who received chemotherapy (two of two vs. four of ten in the 45-51 Gy range; p - .23). The lowest dose associated with retinopathy was 45 Gy delivered to a diabetic patient by twice-a-day fractionation. The data did not suggest an increased risk of radiation retinopathy with increasing age. The current study suggests the importance of total dose as well as dose per fraction, and adds support to a small body of literature suggesting that patients with diabetes mellitus or who receive chemotherapy are at increased risk of injury. A sigmoid dose-response curve is constructed from our current data and data from the literature. 36 refs., 5 figs., 4 tabs

  18. Radiation optic neuropathy after megavoltage external-beam irradiation: Analysis of time-dose factors

    International Nuclear Information System (INIS)

    Parsons, J.T.; Bova, F.J.; Million, R.R.

    1994-01-01

    To investigate the risk of radiation-induced optic neuropathy according to total radiotherapy dose and fraction size, based on both retrospective and prospectively collected data. Between October 1964 and May 1989, 215 optic nerves in 131 patients received fractionated external-beam irradiation during the treatment of primary extracranial head and neck tumors. All patients had a minimum of 3 years of ophthalmologic follow-up (range, 3 to 21 years). The clinical end point was visual acuity of 20/100 or worse as a result of optic nerve injury. Anterior ischemic optic neuropathy developed in five nerves (at mean and median times of 32 and 30 months, respectively, and a range of 2-4 years). Retrobulbar optic neuropathy developed in 12 nerves (at mean and median times of 47 and 28 months, respectively, and a range of 1-14 years). No injuries were observed in 106 optic nerves that received a total dose of <59 Gy. Among nerves that received doses of ≥ 60 Gy, the dose per fraction was more important than the total dose in producing optic neuropathy. The 15-year actuarial risk of optic compared with 47% when given in fraction sizes ≥1.9 Gy. The data also suggest an increased risk of optic nerve injury with increasing age. As there is no effective treatment of radiation-induced optic neuropathy, efforts should be directed at its prevention by minimizing the total dose, paying attention to the dose per fraction to the nerve, and using reduced field techniques where appropriate to limit the volume of tissues that receive high-dose irradiation. 32 refs., 5 figs., 5 tabs

  19. Experimental demonstration of bandwidth on demand (BoD) provisioning based on time scheduling in software-defined multi-domain optical networks

    Science.gov (United States)

    Zhao, Yongli; Li, Yajie; Wang, Xinbo; Chen, Bowen; Zhang, Jie

    2016-09-01

    A hierarchical software-defined networking (SDN) control architecture is designed for multi-domain optical networks with the Open Daylight (ODL) controller. The OpenFlow-based Control Virtual Network Interface (CVNI) protocol is deployed between the network orchestrator and the domain controllers. Then, a dynamic bandwidth on demand (BoD) provisioning solution is proposed based on time scheduling in software-defined multi-domain optical networks (SD-MDON). Shared Risk Link Groups (SRLG)-disjoint routing schemes are adopted to separate each tenant for reliability. The SD-MDON testbed is built based on the proposed hierarchical control architecture. Then the proposed time scheduling-based BoD (Ts-BoD) solution is experimentally demonstrated on the testbed. The performance of the Ts-BoD solution is evaluated with respect to blocking probability, resource utilization, and lightpath setup latency.

  20. Does the dose-solubility ratio affect the mean dissolution time of drugs?

    Science.gov (United States)

    Lánský, P; Weiss, M

    1999-09-01

    To present a new model for describing drug dissolution. On the basis of the new model to characterize the dissolution profile by the distribution function of the random dissolution time of a drug molecule, which generalizes the classical first order model. Instead of assuming a constant fractional dissolution rate, as in the classical model, it is considered that the fractional dissolution rate is a decreasing function of the dissolved amount controlled by the dose-solubility ratio. The differential equation derived from this assumption is solved and the distribution measures (half-dissolution time, mean dissolution time, relative dispersion of the dissolution time, dissolution time density, and fractional dissolution rate) are calculated. Finally, instead of monotonically decreasing the fractional dissolution rate, a generalization resulting in zero dissolution rate at time origin is introduced. The behavior of the model is divided into two regions defined by q, the ratio of the dose to the solubility level: q 1 (saturation of the solution, saturation time). The singular case q = 1 is also treated and in this situation the mean as well as the relative dispersion of the dissolution time increase to infinity. The model was successfully fitted to data (1). This empirical model is descriptive without detailed physical reasoning behind its derivation. According to the model, the mean dissolution time is affected by the dose-solubility ratio. Although this prediction appears to be in accordance with preliminary application, further validation based on more suitable experimental data is required.

  1. An effective deep-inspiration breath-hold radiotherapy technique for left-breast cancer: impact of post-mastectomy treatment, nodal coverage, and dose schedule on organs at risk

    Directory of Open Access Journals (Sweden)

    Rice L

    2017-06-01

    Full Text Available Lynsey Rice,1,2 Christy Goldsmith,1,2 Melanie ML Green,2 Susan Cleator,1,2 Patricia M Price1,2 1Department of Radiation Oncology, The Harley Street Clinic, 2Department of Surgery and Cancer, Imperial College London, London, UK Background: We developed, applied, and prospectively evaluated a novel deep-inspiration breath-hold (DIBH screening and delivery technique to optimize cardiac sparing in left-breast radiotherapy (RT at our clinic. The impact of set-up and dose variables upon organs at risk (OAR dose in DIBH RT was investigated.Methods and materials: All patients with left-breast cancer referred between 2011 and 2014 – of all disease stages, set-up variations, and dose prescriptions – were included. Radiographers used simple screening criteria at CT simulation, to systematically assess patients for obvious DIBH benefit and capability. Selected patients received forward-planned intensity-modulated RT (IMRT based on a DIBH CT scan. A 3D-surface monitoring system with visual feedback assured reproducible DIBH positioning during gated radiation delivery. Patient, target set-up, and OAR dose information were collected at treatment.Results: Of 272 patients who were screened, 4 withdrew, 56 showed no obvious advantage, and 56 showed benefit but had suitability issues; 156 patients were selected and successfully completed DIBH treatment. The technique was compatible with complex set-up and optimal target coverage was maintained. Comparison of free-breathing (FB and DIBH treatment plans in the first five patients enrolled confirmed DIBH reduced heart radiation by ~80% (p = 0.032. Low OAR doses were achieved overall: the mean (95% confidence interval [CI] heart dose was 1.17 (1.12–1.22 Gy, and the mean ipsilateral lung dose was 5.26 (5.01–5.52 Gy. Patients who underwent a standard radiation schedule (40 Gy/15# after breast-conserving surgery had the lowest OAR doses: post-mastectomy treatment, simultaneous supraclavicular (SCV node

  2. Gadodiamide injection for enhancement of MRI in the CNS. Applications, dose, field and time dependence

    Energy Technology Data Exchange (ETDEWEB)

    Aakeson, P

    1996-10-01

    Gadodiamide injection was comparable to Gd-DTPA with regard to both safety and diagnostic efficiency in the central nervous system. The contrast effect of Gd contrast agents is higher at 1.5 T than at 0.3 T both in phantoms and patients with a maximum ratio (signal lesion/signal grey matter) more than 50% higher at 1.5 T. To achieve high contrast effect, heavily T1-weighted images are important. Prolonging the TR from 400 ms to 600 ms reduced the ratio by 15-45% depending on concentration. The effective time window for imaging of BBB (Blood-Brain Barrier) damage is between 2-5 and 25-30 minutes after injection and several scans can be performed without loss of enhancement. To provide maximum detectability of BBB damage in patients, higher doses of Gd contrast media should be useful, especially at low field strengths, as the doses used clinically today do not utilize the maximum contrast effect. High-dose (0.3 mmol/kg b.w.) contrast enhanced MRI (0.3 T) with Gadodiamide injection allowed detection of significantly more and smaller metastases (i.e. BBB damage) than standard dose (0.1 mmol/kg b.w.) High dose contrast-enhanced MRI (0.3 T) did not increase the diagnostic information for the evaluation of patients with failed back surgery syndrome compared to standard dose MRI. 55 refs, 9 figs, 10 tabs.

  3. Gadodiamide injection for enhancement of MRI in the CNS. Applications, dose, field and time dependence

    International Nuclear Information System (INIS)

    Aakeson, P.

    1996-01-01

    Gadodiamide injection was comparable to Gd-DTPA with regard to both safety and diagnostic efficiency in the central nervous system. The contrast effect of Gd contrast agents is higher at 1.5 T than at 0.3 T both in phantoms and patients with a maximum ratio (signal lesion/signal grey matter) more than 50% higher at 1.5 T. To achieve high contrast effect, heavily T1-weighted images are important. Prolonging the TR from 400 ms to 600 ms reduced the ratio by 15-45% depending on concentration. The effective time window for imaging of BBB (Blood-Brain Barrier) damage is between 2-5 and 25-30 minutes after injection and several scans can be performed without loss of enhancement. To provide maximum detectability of BBB damage in patients, higher doses of Gd contrast media should be useful, especially at low field strengths, as the doses used clinically today do not utilize the maximum contrast effect. High-dose (0.3 mmol/kg b.w.) contrast enhanced MRI (0.3 T) with Gadodiamide injection allowed detection of significantly more and smaller metastases (i.e. BBB damage) than standard dose (0.1 mmol/kg b.w.) High dose contrast-enhanced MRI (0.3 T) did not increase the diagnostic information for the evaluation of patients with failed back surgery syndrome compared to standard dose MRI. 55 refs, 9 figs, 10 tabs

  4. Space-Time Dependent Transport, Activation, and Dose Rates for Radioactivated Fluids.

    Science.gov (United States)

    Gavazza, Sergio

    Two methods are developed to calculate the space - and time-dependent mass transport of radionuclides, their production and decay, and the associated dose rates generated from the radioactivated fluids flowing through pipes. The work couples space- and time-dependent phenomena, treated as only space- or time-dependent in the open literature. The transport and activation methodology (TAM) is used to numerically calculate space- and time-dependent transport and activation of radionuclides in fluids flowing through pipes exposed to radiation fields, and volumetric radioactive sources created by radionuclide motions. The computer program Radionuclide Activation and Transport in Pipe (RNATPA1) performs the numerical calculations required in TAM. The gamma ray dose methodology (GAM) is used to numerically calculate space- and time-dependent gamma ray dose equivalent rates from the volumetric radioactive sources determined by TAM. The computer program Gamma Ray Dose Equivalent Rate (GRDOSER) performs the numerical calculations required in GAM. The scope of conditions considered by TAM and GAM herein include (a) laminar flow in straight pipe, (b)recirculating flow schemes, (c) time-independent fluid velocity distributions, (d) space-dependent monoenergetic neutron flux distribution, (e) space- and time-dependent activation process of a single parent nuclide and transport and decay of a single daughter radionuclide, and (f) assessment of space- and time-dependent gamma ray dose rates, outside the pipe, generated by the space- and time-dependent source term distributions inside of it. The methodologies, however, can be easily extended to include all the situations of interest for solving the phenomena addressed in this dissertation. A comparison is made from results obtained by the described calculational procedures with analytical expressions. The physics of the problems addressed by the new technique and the increased accuracy versus non -space and time-dependent methods

  5. Clinical significance of cumulative biological effective dose and overall treatment time in the treatment of carcinoma cervix

    Directory of Open Access Journals (Sweden)

    Mandal Abhijit

    2007-01-01

    Full Text Available The purpose of this retrospective study is to report the radiotherapy treatment response of, and complications in, patients with cervical cancer on the basis of cumulative biologic effective dose (BED and overall treatment time (OTT. Sixty-four (stage II - 35/64; stage III - 29/64 patients of cervical cancer were treated with combination of external beam radiotherapy (EBRT and low dose rate intracavitary brachytherapy (ICBT. The cumulative BED was calculated at Point A (BED 10 ; and bladder, rectal reference points (BED 2.5 using the linear-quadratic BED equations. The local control (LC rate and 5-year disease-free survival (DFS rate in patients of stage II were comparable for BED 10 < 84.5 and BED 10 > 84.5 but were much higher for BED 10 > 84.5 than BED 10 < 84.5 ( P < 0.01 in stage III patients. In the stage II patients, The LC rate and 5-year DFS rate were comparable for OTT < 50 days and for OTT> 50 days but were much higher in stage III patients with OTT < 50 than OTT> 50 days ( P < 0.001. It was also observed that patients who received BED 2.5 < 105 had lesser rectal ( P < 0.001 and bladder complications than BED 2.5 > 105. Higher rectal complication-free survival (CFS R rate, bladder complication-free survival (CFS B rate and all-type late complication-free survival rate were observed in patients who received BED 2.5 < 105 than BED 2.5 > 105. A balanced, optimal and justified radiotherapy treatment schedule to deliver higher BED 10 (>84.5 and lower BED 2.5 (< 105 in lesser OTT (< 50 days is essential in carcinoma cervix to expect a better treatment outcome in all respects.

  6. Real time determination of dose radiation through artificial intelligence and virtual reality

    International Nuclear Information System (INIS)

    Freitas, Victor G.G.; Mol, Antonio C.A.; Pereira, Claudio M.N.A.

    2009-01-01

    In the last years, a virtual environment of Argonauta research reactor, sited in the Instituto de Engenharia Nuclear (Brazil), has been developed. Such environment, called here Argonauta Virtual (AV), is a 3D model of the reactor hall, in which virtual people (avatar) can navigate. In AV, simulations of nuclear sources and doses are possible. In a recent work, a real time monitoring system (RTMS) was developed to provide (by means of Ethernet TCP/IP) the information of area detectors situated in the reactor hall. Extending the scope of AV, this work is intended to provide a continuous determination of gamma radiation dose in the reactor hall, based in several monitored parameters. To accomplish that a module based in artificial neural network (ANN) was developed. The ANN module is able to predict gamma radiation doses using as inputs: the avatar position (from virtual environment), the reactor power (from RTMS) and information of fixed area detectors (from RTMS). The ANN training data has been obtained by measurements of gamma radiation doses in a mesh of points, with previously defined positions, for different power levels. Through the use of ANN it is possible to estimate, in real time, the dose received by a person at any position in Argonauta reactor hall. Such approach allows tasks simulations and training of people inside the AV system, without exposing them to radiation effects. (author)

  7. Real time determination of dose radiation through artificial intelligence and virtual reality

    International Nuclear Information System (INIS)

    Freitas, Victor Goncalves Gloria

    2009-01-01

    In the last years, a virtual environment of Argonauta research reactor, sited in the Instituto de Engenharia Nuclear (Brazil), has been developed. Such environment, called here Argonauta Virtual (AV), is a 3D model of the reactor hall, in which virtual people (avatar) can navigate. In AV, simulations of nuclear sources and doses are possible. In a recent work, a real time monitoring system (RTMS) was developed to provide (by means of Ethernet TCP/I P) the information of area detectors situated in the reactor hall. Extending the scope of AV, this work is intended to provide a continuous determination of gamma radiation dose in the reactor hall, based in several monitored parameters. To accomplish that a module based in artificial neural network (ANN) was developed. The ANN module is able to predict gamma radiation doses using as inputs: the avatar position (from virtual environment), the reactor power (from RTMS) and information of fixed area detectors (from RTMS). The ANN training data has been obtained by measurements of gamma radiation doses in a mesh of points, with previously defined positions, for different power levels. Through the use of ANN it is possible to estimate, in real time, the dose received by a person at any position in Argonauta reactor hall. Such approach allows tasks simulations and training of people inside the AV system, without exposing them to radiation effects. (author)

  8. Dose-Time Effect of Crude Oil and Hydro-test Effluent on Freshwater ...

    African Journals Online (AJOL)

    This work was undertaken to investigate the dose-time effect of crude oil and hydro-test effluent on freshwater and brackish water habitats. The species used for the acute toxicity were freshwater fish, Tilapia guineenis (fry) and a brackish water shrimp, Palaemonetes africanus. Test results indicated that the brackish water ...

  9. Estimating exponential scheduling preferences

    DEFF Research Database (Denmark)

    Hjorth, Katrine; Börjesson, Maria; Engelson, Leonid

    2015-01-01

    of car drivers' route and mode choice under uncertain travel times. Our analysis exposes some important methodological issues related to complex non-linear scheduling models: One issue is identifying the point in time where the marginal utility of being at the destination becomes larger than the marginal......Different assumptions about travelers' scheduling preferences yield different measures of the cost of travel time variability. Only few forms of scheduling preferences provide non-trivial measures which are additive over links in transport networks where link travel times are arbitrarily...... utility of being at the origin. Another issue is that models with the exponential marginal utility formulation suffer from empirical identification problems. Though our results are not decisive, they partly support the constant-affine specification, in which the value of travel time variability...

  10. NASA Schedule Management Handbook

    Science.gov (United States)

    2011-01-01

    The purpose of schedule management is to provide the framework for time-phasing, resource planning, coordination, and communicating the necessary tasks within a work effort. The intent is to improve schedule management by providing recommended concepts, processes, and techniques used within the Agency and private industry. The intended function of this handbook is two-fold: first, to provide guidance for meeting the scheduling requirements contained in NPR 7120.5, NASA Space Flight Program and Project Management Requirements, NPR 7120.7, NASA Information Technology and Institutional Infrastructure Program and Project Requirements, NPR 7120.8, NASA Research and Technology Program and Project Management Requirements, and NPD 1000.5, Policy for NASA Acquisition. The second function is to describe the schedule management approach and the recommended best practices for carrying out this project control function. With regards to the above project management requirements documents, it should be noted that those space flight projects previously established and approved under the guidance of prior versions of NPR 7120.5 will continue to comply with those requirements until project completion has been achieved. This handbook will be updated as needed, to enhance efficient and effective schedule management across the Agency. It is acknowledged that most, if not all, external organizations participating in NASA programs/projects will have their own internal schedule management documents. Issues that arise from conflicting schedule guidance will be resolved on a case by case basis as contracts and partnering relationships are established. It is also acknowledged and understood that all projects are not the same and may require different levels of schedule visibility, scrutiny and control. Project type, value, and complexity are factors that typically dictate which schedule management practices should be employed.

  11. Enteroclysis and small bowel series: Comparison of radiation dose and examination time

    International Nuclear Information System (INIS)

    Thoeni, R.F.; Gould, R.G.

    1991-01-01

    Respective radiation doses and total examination and fluoroscopy times were compared for 50 patients; 25 underwent enteroclysis and 25 underwent small bowel series with (n = 17) and without (n = 8) an examination of the upper gastrointestinal (GI) tract. For enteroclysis, the mean skin entry radiation dose (12.3 rad [123 mGy]) and mean fluoroscopy time (18.4 minutes) were almost 1 1/2 times greater than those for the small bowel series with examination of the upper GI tract (8.4 rad [84 mGy]; 11.4 minutes) and almost three times greater than those for the small bowel series without upper GI examination (4.6 rad [46 mGy]; 6.3 minutes). However, the mean total examination completion time for enteroclysis (31.2 minutes) was almost half that of the small bowel series without upper GI examination (57.5 minutes) and almost four times shorter than that of the small bowel series with upper GI examination (114 minutes). The higher radiation dose of enteroclysis should be considered along with the short examination time, the age and clinical condition of the patient, and the reported higher accuracy when deciding on the appropriate radiographic examination of the small bowel

  12. Calculation of rectal dose surface histograms in the presence of time varying deformations

    International Nuclear Information System (INIS)

    Roeske, John C.; Spelbring, Danny R.; Vijayakumar, S.; Forman, Jeffrey D.; Chen, George T.Y.

    1996-01-01

    Purpose: Dose volume (DVH) and dose surface histograms (DSH) of the bladder and rectum are usually calculated from a single treatment planning scan. These DVHs and DSHs will eventually be correlated with complications to determine parameters for normal tissue complication probabilities (NTCP). However, from day to day, the size and shape of the rectum and bladder may vary. The purpose of this study is to compare a more accurate estimate of the time integrated DVHs and DSHs of the rectum (in the presence of daily variations in rectal shape) to initial DVHs/DSHs. Methods: 10 patients were scanned once per week during the course of fractionated radiotherapy, typically accumulating a total of six scans. The rectum and bladder were contoured on each of the studies. The model used to assess effects of rectal contour deformation is as follows: the contour on a given axial slice (see figure) is boxed within a rectangle. A line drawn parallel to the AP axis through the rectangle equally partitions the box. Starting at the intersection of the vertical line and the rectal contour, points on the contour are marked off representing the same rectal dose point, even in the presence of distortion. Corresponding numbered points are used to sample the dose matrix and create a composite DSH. The model assumes uniform stretching of the rectal contour for any given axial cut, and no twist of the structure or vertical displacement. A similar model is developed for the bladder with spherical symmetry. Results: Normalized DSHs (nDSH) for each CT scan were calculated as well as the time averaged nDSH over all scans. These were compared with the nDSH from the initial planning scan. Individual nDSHs differed by 8% surface area irradiated at the 80% dose level, to as much as 20% surface area in the 70-100% dose range. DSH variations are due to position and shape changes in the rectum during different CT scans. The spatial distribution of dose is highly variable, and depends on the field

  13. Effects of varied doses of psilocybin on time interval reproduction in human subjects.

    Science.gov (United States)

    Wackermann, Jirí; Wittmann, Marc; Hasler, Felix; Vollenweider, Franz X

    2008-04-11

    Action of a hallucinogenic substance, psilocybin, on internal time representation was investigated in two double-blind, placebo-controlled studies: Experiment 1 with 12 subjects and graded doses, and Experiment 2 with 9 subjects and a very low dose. The task consisted in repeated reproductions of time intervals in the range from 1.5 to 5s. The effects were assessed by parameter kappa of the 'dual klepsydra' model of internal time representation, fitted to individual response data and intra-individually normalized with respect to initial values. The estimates kappa were in the same order of magnitude as in earlier studies. In both experiments, kappa was significantly increased by psilocybin at 90 min from the drug intake, indicating a higher loss rate of the internal duration representation. These findings are tentatively linked to qualitative alterations of subjective time in altered states of consciousness.

  14. Calculation of residence times and radiation doses using the standard PC software Excel

    International Nuclear Information System (INIS)

    Herzog, H.; Zilken, H.; Niederbremer, A.; Friedrich, W.; Mueller-Gaertner, H.W.

    1997-01-01

    We developed a program which aims to facilitate the calculation of radiation doses to single organs and the whole body. IMEDOSE uses Excel to include calculations, graphical displays, and interactions with the user in a single general-purpose PC software tool. To start the procedure the input data are copied into a spreadsheet. They must represent percentage uptake values of several organs derived from measurements in animals or humans. To extrapolate these data up to seven half-lives of the radionuclide, fitting to one or two exponentional functions is included and can be checked by the user. By means of the approximate time-activity information the cumulated activity or residence times are calculated. Finally these data are combined with the absorbed fraction doses (S-values) given by MIRD pamphlet No. 11 to yield radiation doses, the effective dose equivalent and the effective dose. These results are presented in a final table. Interactions are realized with push-buttons and drop-down menus. Calculations use the Visual Basic tool of Excel. In order to test our program, biodistribution data of fluorine-18 fluorodeoxyglucose were taken from the literature (Meija et al., J Nucl Med 1991; 32:699-706). For a 70-kg adult the resulting radiation doses of all target organs listed in MIRD 11 were different from the ICRP 53 values by 1%±18% on the average. When the residence times were introduced into MIRDOSE3 (Stabin, J Nucl Med 1996; 37:538-546) the mean difference between our results and those of MIRDOSE3 was -3%±6%. Both outcomes indicate the validity of the present approach. (orig.)

  15. Calculation of residence times and radiation doses using the standard PC software Excel.

    Science.gov (United States)

    Herzog, H; Zilken, H; Niederbremer, A; Friedrich, W; Müller-Gärtner, H W

    1997-12-01

    We developed a program which aims to facilitate the calculation of radiation doses to single organs and the whole body. IMEDOSE uses Excel to include calculations, graphical displays, and interactions with the user in a single general-purpose PC software tool. To start the procedure the input data are copied into a spreadsheet. They must represent percentage uptake values of several organs derived from measurements in animals or humans. To extrapolate these data up to seven half-lives of the radionuclide, fitting to one or two exponentional functions is included and can be checked by the user. By means of the approximate time-activity information the cumulated activity or residence times are calculated. Finally these data are combined with the absorbed fraction doses (S-values) given by MIRD pamphlet No. 11 to yield radiation doses, the effective dose equivalent and the effective dose. These results are presented in a final table. Interactions are realized with push-buttons and drop-down menus. Calculations use the Visual Basic tool of Excel. In order to test our program, biodistribution data of fluorine-18 fluorodeoxyglucose were taken from the literature (Meija et al., J Nucl Med 1991; 32:699-706). For a 70-kg adult the resulting radiation doses of all target organs listed in MIRD 11 were different from the ICRP 53 values by 1%+/-18% on the average. When the residence times were introduced into MIRDOSE3 (Stabin, J Nucl Med 1996; 37:538-546) the mean difference between our results and those of MIRDOSE3 was -3%+/-6%. Both outcomes indicate the validity of the present approach.

  16. Calculation of residence times and radiation doses using the standard PC software Excel

    Energy Technology Data Exchange (ETDEWEB)

    Herzog, H.; Zilken, H.; Niederbremer, A.; Friedrich, W. [Institute of Medicine, Research Center Juelich, Juelich (Germany); Mueller-Gaertner, H.W. [Institute of Medicine, Research Center Juelich, Juelich (Germany)]|[Department of Nuclear Medicine, Heinrich-Heine University Hospital Duesseldorf (Germany)

    1997-12-01

    We developed a program which aims to facilitate the calculation of radiation doses to single organs and the whole body. IMEDOSE uses Excel to include calculations, graphical displays, and interactions with the user in a single general-purpose PC software tool. To start the procedure the input data are copied into a spreadsheet. They must represent percentage uptake values of several organs derived from measurements in animals or humans. To extrapolate these data up to seven half-lives of the radionuclide, fitting to one or two exponentional functions is included and can be checked by the user. By means of the approximate time-activity information the cumulated activity or residence times are calculated. Finally these data are combined with the absorbed fraction doses (S-values) given by MIRD pamphlet No. 11 to yield radiation doses, the effective dose equivalent and the effective dose. These results are presented in a final table. Interactions are realized with push-buttons and drop-down menus. Calculations use the Visual Basic tool of Excel. In order to test our program, biodistribution data of fluorine-18 fluorodeoxyglucose were taken from the literature (Meija et al., J Nucl Med 1991; 32:699-706). For a 70-kg adult the resulting radiation doses of all target organs listed in MIRD 11 were different from the ICRP 53 values by 1%{+-}18% on the average. When the residence times were introduced into MIRDOSE3 (Stabin, J Nucl Med 1996; 37:538-546) the mean difference between our results and those of MIRDOSE3 was -3%{+-}6%. Both outcomes indicate the validity of the present approach. (orig.) With 5 figs., 2 tabs., 18 refs.

  17. An Enhanced Discrete Artificial Bee Colony Algorithm to Minimize the Total Flow Time in Permutation Flow Shop Scheduling with Limited Buffers

    Directory of Open Access Journals (Sweden)

    Guanlong Deng

    2016-01-01

    Full Text Available This paper presents an enhanced discrete artificial bee colony algorithm for minimizing the total flow time in the flow shop scheduling problem with buffer capacity. First, the solution in the algorithm is represented as discrete job permutation to directly convert to active schedule. Then, we present a simple and effective scheme called best insertion for the employed bee and onlooker bee and introduce a combined local search exploring both insertion and swap neighborhood. To validate the performance of the presented algorithm, a computational campaign is carried out on the Taillard benchmark instances, and computations and comparisons show that the proposed algorithm is not only capable of solving the benchmark set better than the existing discrete differential evolution algorithm and iterated greedy algorithm, but also capable of performing better than two recently proposed discrete artificial bee colony algorithms.

  18. Incorporating space-time constraints and activity-travel time profiles in a multi-state supernetwork approach to individual activity-travel scheduling

    NARCIS (Netherlands)

    Liao, F.; Arentze, T.A.; Timmermans, H.J.P.

    2013-01-01

    Activity-travel scheduling is at the core of many activity-based models that predict short-term effects of travel information systems and travel demand management. Multi-state supernetworks have been advanced to represent in an integral fashion the multi-dimensional nature of activity-travel

  19. Project Schedule Simulation

    DEFF Research Database (Denmark)

    Mizouni, Rabeb; Lazarova-Molnar, Sanja

    2015-01-01

    overrun both their budget and time. To improve the quality of initial project plans, we show in this paper the importance of (1) reflecting features’ priorities/risk in task schedules and (2) considering uncertainties related to human factors in plan schedules. To make simulation tasks reflect features......’ priority as well as multimodal team allocation, enhanced project schedules (EPS), where remedial actions scenarios (RAS) are added, were introduced. They reflect potential schedule modifications in case of uncertainties and promote a dynamic sequencing of involved tasks rather than the static conventional...... this document as an instruction set. The electronic file of your paper will be formatted further at Journal of Software. Define all symbols used in the abstract. Do not cite references in the abstract. Do not delete the blank line immediately above the abstract; it sets the footnote at the bottom of this column....

  20. Decentralized Ground Staff Scheduling

    DEFF Research Database (Denmark)

    Sørensen, M. D.; Clausen, Jens

    2002-01-01

    scheduling is investigated. The airport terminal is divided into zones, where each zone consists of a set of stands geographically next to each other. Staff is assigned to work in only one zone and the staff scheduling is planned decentralized for each zone. The advantage of this approach is that the staff...... work in a smaller area of the terminal and thus spends less time walking between stands. When planning decentralized the allocation of stands to flights influences the staff scheduling since the workload in a zone depends on which flights are allocated to stands in the zone. Hence solving the problem...... depends on the actual stand allocation but also on the number of zones and the layout of these. A mathematical model of the problem is proposed, which integrates the stand allocation and the staff scheduling. A heuristic solution method is developed and applied on a real case from British Airways, London...

  1. Adequate technologies for wireless real-time dose rate monitoring for off-site emergency management

    International Nuclear Information System (INIS)

    Dielmann, R.; Buerkin, W.

    2003-01-01

    Full text: What are the requirements for off-site gamma dose rate monitoring systems? What are the pros and cons of available communication technologies? This report gives an overview of modern communication techniques and their applicability for reliable real-time data acquisition as basis for off-site nuclear emergency management. The results of three years operating experience with a wireless gamma dose rate monitoring system, installed around the NPPs of KURSK, KALININ and BALAKOVA (Russia) in the year 2000, are shown. (author)

  2. Studying the potential of point detectors in time-resolved dose verification of dynamic radiotherapy

    DEFF Research Database (Denmark)

    Beierholm, Anders Ravnsborg; Behrens, C. F.; Andersen, Claus E.

    2015-01-01

    based on fiber-coupled plastic scintillator detectors was evaluated and compared with a Farmer-type ionization chamber and a small-volume ionization chamber. An important feature of scintillator detectors is that the sensitive volume of the detector can easily be scaled, and five scintillator detectors......-volume ionization chamber and the smallest scintillators. The time-resolved RapidArc dose profiles revealed volume-dependent discrepancies between scintillator and ionization chamber response, which confirmed that correction factors for ionization chambers in high temporal and spatial dose gradients are dominated...

  3. Gain-scheduled {{\\mathscr{H}}}_{\\infty } buckling control of a circular beam-column subject to time-varying axial loads

    Science.gov (United States)

    Schaeffner, Maximilian; Platz, Roland

    2018-06-01

    For slender beam-columns loaded by axial compressive forces, active buckling control provides a possibility to increase the maximum bearable axial load above that of a purely passive structure. In this paper, an approach for gain-scheduled {{\\mathscr{H}}}∞ buckling control of a slender beam-column with circular cross-section subject to time-varying axial loads is investigated experimentally. Piezo-elastic supports with integrated piezoelectric stack actuators at the beam-column ends allow an active stabilization in arbitrary lateral directions. The axial loads on the beam-column influence its lateral dynamic behavior and, eventually, cause the beam-column to buckle. A reduced modal model of the beam-column subject to axial loads including the dynamics of the electrical components is set up and calibrated with experimental data. Particularly, the linear parameter-varying open-loop plant is used to design a model-based gain-scheduled {{\\mathscr{H}}}∞ buckling control that is implemented in an experimental test setup. The beam-column is loaded by ramp- and step-shaped time-varying axial compressive loads that result in a lateral deformation of the beam-column due to imperfections, such as predeformation, eccentric loading or clamping moments. The lateral deformations and the maximum bearable loads of the beam-column are analyzed and compared for the beam-column with and without gain-scheduled {{\\mathscr{H}}}∞ buckling control or, respectively, active and passive configuration. With the proposed gain-scheduled {{\\mathscr{H}}}∞ buckling control it is possible to increase the maximum bearable load of the active beam-column by 19% for ramp-shaped axial loads and to significantly reduce the beam-column deformations for step-shaped axial loads compared to the passive structure.

  4. Time-integrated thyroid dose for accidental releases from Pakistan Research Reactor-1

    International Nuclear Information System (INIS)

    Raza, S Shoaib; Iqbal, M; Salahuddin, A; Avila, R; Pervez, S

    2004-01-01

    The two-hourly time-integrated thyroid dose due to radio-iodines released to the atmosphere through the exhaust stack of Pakistan Research Reactor-1 (PARR-1), under accident conditions, has been calculated. A computer program, PAKRAD (which was developed under an IAEA research grant, PAK/RCA/8990), was used for the dose calculations. The sensitivity of the dose results to different exhaust flow rates and atmospheric stability classes was studied. The effect of assuming a constant activity concentration (as a function of time) within the containment air volume and an exponentially decreasing air concentration on the time-integrated dose was also studied for various flow rates (1000-50,000 m 3 h -1 ). The comparison indicated that the results were insensitive to the containment air exhaust rates up to or below 2000 m 3 h -1 , when the prediction with the constant activity concentration assumption was compared to an exponentially decreasing activity concentration model. The results also indicated that the plume touchdown distance increases with increasing atmospheric stability. (note)

  5. Effect of dose rate and exposure time on the stimulation effect of tube growth of Pinus sylvestris pollen

    International Nuclear Information System (INIS)

    Zelles, L.; Fendrik, I.; Technische Univ. Hannover

    1975-01-01

    The stimulating effect of ionizing radiation in respect to dose rate and exposure time was studied using the tube growth of Pinus silvestris pollen. Stimulation was registered with a small dose (50 rad) supplied at low dose rates (0.5; 1.0; 3.0 and 5.0 rad/sec) and with higher doses (300; 800 and 1,400 rad) supplied at higher dose rates (10; 40 and 50 rad/sec). This suggests that only the exposure time is of importance for radiation-induced stimulation provided that the exposure time does not exceed 100 sec. (orig.) [de

  6. Biological effect of pulsed dose rate brachytherapy with stepping sources if short half-times of repair are present in tissues

    International Nuclear Information System (INIS)

    Fowler, Jack F.; Limbergen, Erik F.M. van

    1997-01-01

    Purpose: To explore the possible increase of radiation effect in tissues irradiated by pulsed brachytherapy (PDR) for local tissue dose rates between those 'averaged over the whole pulse' and the instantaneous high dose rates close to the dwell positions. Increased effect is more likely for tissues with short half-times of repair of the order of a few minutes, similar to pulse durations. Methods and Materials: Calculations were done assuming the linear quadratic formula for radiation damage, in which only the dose-squared term is subject to exponential repair. The situation with two components of T (1(2)) is addressed. A constant overall time of 140 h and a constant total dose of 70 Gy were assumed throughout, the continuous low dose rate of 0.5 Gy/h (CLDR) providing the unitary standard effects for each PDR condition. Effects of dose rates ranging from 4 Gy/h to 120 Gy/h (HDR at 2 Gy/min) were studied, covering the gap in an earlier publication. Four schedules were examined: doses per pulse of 0.5, 1, 1.5, and 2 Gy given at repetition frequencies of 1, 2, 3, and 4 h, respectively, each with a range of assumed half-times of repair of 4 min to 1.5 h. Results are presented for late-responding tissues, the differences from CLDR being two or three times greater than for early-responding tissues and most tumors. Results: Curves are presented relating the ratio of increased biological effect (proportional to log cell kill) calculated for PDR relative to CLDR. Ratios as high as 1.5 can be found for large doses per pulse (2 Gy) if the half-time of repair in tissues is as short as a few minutes. The major influences on effect are dose per pulse, half-time of repair in tissue, and--when T (1(2)) is short--the instantaneous dose rate. Maximum ratios of PDR/CLDR occur when the dose rate is such that pulse duration is approximately equal to T (1(2)) . As dose rate in the pulse is increased, a plateau of effect is reached, for most T (1(2)) s, above 10 to 20 Gy/h, which is

  7. Dosing-time-dependent variation in biliary excretion of flomoxef in rats.

    Science.gov (United States)

    Hishikawa, Shuji; Sugimoto, Koh-ichi; Kobayashi, Eiji; Kumagai, Yuji; Fujimura, Akio

    2003-05-01

    We previously reported that the biliary excretion of flomoxef, an oxacephem antibiotic, was greater after dosing at 21:00 than at 09:00 h in diurnally active human subjects. The present study was undertaken to examine whether the biliary excretion of flomoxef is also dependent on its dosing time in rats. Adult male Wistar rats were housed under light on at 07:00 h and off at 19:00 h. Bile fluid was completely drained through a polyethylene catheter from conscious animals. Flomoxef (20 mg/kg) was injected into the tail vein at 09:00 or 21:00 h by a cross-over design, and drained bile fluid was collected for 8 h after each dosing. The maximum concentration of biliary flomoxef was significantly greater and its total excretion tended to be greater after dosing at 09:00 than 21:00 h. These results suggest the biliary excretion of flomoxef is enhanced after dosing at the beginning of the rest period in rats, as it is in humans.

  8. Impact of Penicillin Allergy on Time to First Dose of Antimicrobial Therapy and Clinical Outcomes.

    Science.gov (United States)

    Conway, Erin L; Lin, Ken; Sellick, John A; Kurtzhalts, Kari; Carbo, James; Ott, Michael C; Mergenhagen, Kari A

    2017-11-01

    The objective of this study was to evaluate the impact of a listed penicillin allergy on the time to first dose of antibiotic in a Veterans Affairs hospital. Additional clinical outcomes of patients with penicillin allergies were compared with those of patients without a penicillin allergy. A retrospective chart review of veterans admitted through the emergency department with a diagnosis of pneumonia, urinary tract infection, bacteremia, and sepsis from January 2006 to December 2015 was conducted. The primary outcome was time to first dose of antibiotic treatment, defined as the time from when the patient presented to the emergency department to the medication administration time. Secondary outcomes included total antibiotic therapy duration and treatment outcomes, including mortality, length of stay, and 30-day readmission rate. A total of 403 patients were included in the final analysis; 57 patients (14.1%) had a listed penicillin allergy. The average age of the population was 75 years and 99% of the population was male. The mean time to first dose of antibiotic treatment for patients with a penicillin allergy was prolonged compared with those without a penicillin allergy (236.1 vs 186.6 minutes; P = 0.03), resulting in an approximately 50-minute delay. Penicillin-allergic patients were more likely to receive a carbapenem or fluoroquinolone antibiotic (P penicillin allergy had a prolonged time to first dose of antibiotic therapy. No significant differences were found in total antibiotic duration, length of stay, or 30-day readmission rate. The small sample size, older population, and single-center nature of this study may limit the generalizability of the present findings to other populations. Published by Elsevier Inc.

  9. [Working time and sleep in nursing staff employed in "3 x 8" and "2 x 12" fast rotating shift schedules].

    Science.gov (United States)

    Castellini, G; Anelli, M M; Punzi, S; Boari, P; Camerino, D; Costa, G

    2011-01-01

    The study is aimed at assessing, in 200 nurses shift workers, the impact on sleep of two different working areas ("emergency" and "hospitalization") having the same "3 x 8" shift system, and of two different shift schedules at quick rotation ("2 x 12" and "3 x 8") in the same working area ("emergency"). Night and morning shifts prove to interfere to a greater extent with sleep in relation to both "2 x 12" and "3 x 8" shift systems as well as to the two operative areas. Hence the importance to consider in shift work planning, the direction of shift rotation and the length of the duty period according to the type of activity.

  10. Real-time integration of optimal generation scheduling with MPC for the energy management of a renewable hydrogen-based microgrid

    International Nuclear Information System (INIS)

    Petrollese, Mario; Valverde, Luis; Cocco, Daniele; Cau, Giorgio; Guerra, José

    2016-01-01

    Highlights: • Energy management strategy for a renewable hydrogen-based microgrid. • Integration of optimal generation scheduling with a model predictive control. • Experimental tests are carried out simulating typical summer and winter days. • Effective improvement in performance and reduction in microgrid operating cost are achieved. - Abstract: This paper presents a novel control strategy for the optimal management of microgrids with high penetration of renewable energy sources and different energy storage systems. The control strategy is based on the integration of optimal generation scheduling with a model predictive control in order to achieve both long and short-term optimal planning. In particular, long-term optimization of the various microgrid components is obtained by the adoption of an optimal generation scheduling, in which a statistical approach is used to take into account weather and load forecasting uncertainties. The real-time management of the microgrid is instead entrusted to a model predictive controller, which has the important feature of using the results obtained by the optimal generation scheduling. The proposed control strategy was tested in a laboratory-scale microgrid present at the University of Seville, which is composed of an electronic power source that emulates a photovoltaic system, a battery bank and a hydrogen production and storage system. Two different experimental tests that simulate a summer and a winter day were carried out over a 24-h period to verify the reliability and performance enhancement of the control system. Results show an effective improvement in performance in terms of reduction of the microgrid operating cost and greater involvement of the hydrogen storage system for the maintenance of a spinning reserve in batteries.

  11. Influence of dose and its distribution in time on dose-response relationships for low-LET radiation

    International Nuclear Information System (INIS)

    Anon.

    1980-01-01

    This book examines the influence of dose rate and magnitude on the genetic and carcinogenic effects of radiation exposure in animals and man. It systematically examines a broad range of biological effects in simple systems, plants, laboratory animals, and man with special attention given to the effects of prenatal irradiation, changes in life span, and tumorigenesis. An enormous volume of data is provided about human tumorigenesis and the data and shortcomings are summarized. There is an extended general discussion of the consideration in quantitative dose and dose rate relationships and of the limitations of the data and analyses which have led to a linear interpolation of risk at low doses and dose rates. An argument is made for dose rate dependence in tumorigenesis as being consistent with all other radiation effects and for the applicability of Dose Rate Effectiveness Factors (DREF) in providing a more realistic assessment of the risk of radiation carcinogenesis. The report is documented with 24 pages of references. There are numerous graphs and tables, all clear and to the point. This book is a superb review and summary of the data on radiation risks

  12. [Fluoroscopy dose reduction of computed tomography guided chest interventional radiology using real-time iterative reconstruction].

    Science.gov (United States)

    Hasegawa, Hiroaki; Mihara, Yoshiyuki; Ino, Kenji; Sato, Jiro

    2014-11-01

    The purpose of this study was to evaluate the radiation dose reduction to patients and radiologists in computed tomography (CT) guided examinations for the thoracic region using CT fluoroscopy. Image quality evaluation of the real-time filtered back-projection (RT-FBP) images and the real-time adaptive iterative dose reduction (RT-AIDR) images was carried out on noise and artifacts that were considered to affect the CT fluoroscopy. The image standard deviation was improved in the fluoroscopy setting with less than 30 mA on 120 kV. With regard to the evaluation of artifact visibility and the amount generated by the needle attached to the chest phantom, there was no significant difference between the RT-FBP images with 120 kV, 20 mA and the RT-AIDR images with low-dose conditions (greater than 80 kV, 30 mA and less than 120 kV, 20 mA). The results suggest that it is possible to reduce the radiation dose by approximately 34% at the maximum using RT-AIDR while maintaining image quality equivalent to the RT-FBP images with 120 V, 20 mA.

  13. Influence of dosing times on cisplatin-induced peripheral neuropathy in rats

    International Nuclear Information System (INIS)

    Seto, Yoshihiro; Okazaki, Fumiyasu; Horikawa, Keiji; Zhang, Jing; Sasaki, Hitoshi; To, Hideto

    2016-01-01

    Although cis-diamminedichloro-platinum (CDDP) exhibits strong therapeutic effects in cancer chemotherapy, its adverse effects such as peripheral neuropathy, nephropathy, and vomiting are dose-limiting factors. Previous studies reported that chronotherapy decreased CDDP-induced nephropathy and vomiting. In the present study, we investigated the influence of dosing times on CDDP-induced peripheral neuropathy in rats. CDDP (4 mg/kg) was administered intravenously at 5:00 or 17:00 every 7 days for 4 weeks to male Sprague–Dawley rats, and saline was given to the control group. To assess the dosing time dependency of peripheral neuropathy, von-Frey test and hot-plate test were performed. In order to estimate hypoalgesia, the hot-plate test was performed in rats administered CDDP weekly for 4 weeks. On day 28, the withdrawal latency to thermal stimulation was significantly prolonged in the 17:00-treated group than in the control and 5:00-treated groups. When the von-Frey test was performed to assess mechanical allodynia, the withdrawal threshold was significantly lower in the 5:00 and 17:00-treated groups than in the control group on day 6 after the first CDDP dose. The 5:00-treated group maintained allodynia throughout the experiment with the repeated administration of CDDP, whereas the 17:00-treated group deteriorated from allodynia to hypoalgesia. It was revealed that the severe of CDDP-induced peripheral neuropathy was inhibited in the 5:00-treated group, whereas CDDP-treated groups exhibited mechanical allodynia. These results suggested that the selection of an optimal dosing time ameliorated CDDP-induced peripheral neuropathy. The online version of this article (doi:10.1186/s12885-016-2777-0) contains supplementary material, which is available to authorized users

  14. Scheduling theory, algorithms, and systems

    CERN Document Server

    Pinedo, Michael L

    2016-01-01

    This new edition of the well-established text Scheduling: Theory, Algorithms, and Systems provides an up-to-date coverage of important theoretical models in the scheduling literature as well as important scheduling problems that appear in the real world. The accompanying website includes supplementary material in the form of slide-shows from industry as well as movies that show actual implementations of scheduling systems. The main structure of the book, as per previous editions, consists of three parts. The first part focuses on deterministic scheduling and the related combinatorial problems. The second part covers probabilistic scheduling models; in this part it is assumed that processing times and other problem data are random and not known in advance. The third part deals with scheduling in practice; it covers heuristics that are popular with practitioners and discusses system design and implementation issues. All three parts of this new edition have been revamped, streamlined, and extended. The reference...

  15. Hybrid job shop scheduling

    NARCIS (Netherlands)

    Schutten, Johannes M.J.

    1995-01-01

    We consider the problem of scheduling jobs in a hybrid job shop. We use the term 'hybrid' to indicate that we consider a lot of extensions of the classic job shop, such as transportation times, multiple resources, and setup times. The Shifting Bottleneck procedure can be generalized to deal with

  16. Integer batch scheduling problems for a single-machine with simultaneous effect of learning and forgetting to minimize total actual flow time

    Directory of Open Access Journals (Sweden)

    Rinto Yusriski

    2015-09-01

    Full Text Available This research discusses an integer batch scheduling problems for a single-machine with position-dependent batch processing time due to the simultaneous effect of learning and forgetting. The decision variables are the number of batches, batch sizes, and the sequence of the resulting batches. The objective is to minimize total actual flow time, defined as total interval time between the arrival times of parts in all respective batches and their common due date. There are two proposed algorithms to solve the problems. The first is developed by using the Integer Composition method, and it produces an optimal solution. Since the problems can be solved by the first algorithm in a worst-case time complexity O(n2n-1, this research proposes the second algorithm. It is a heuristic algorithm based on the Lagrange Relaxation method. Numerical experiments show that the heuristic algorithm gives outstanding results.

  17. Integrated Harvest and Distribution Scheduling with Time Windows of Perishable Agri-Products in One-Belt and One-Road Context

    Directory of Open Access Journals (Sweden)

    Yiping Jiang

    2018-05-01

    Full Text Available The unique characteristics of perishable agri-products are a short lifespan and rapid quality deterioration. This establishes the need to significantly reduce the time from harvest to distribution. These features require reducing the processing time from harvest to distribution to being as short as possible. In this study, we focus on an integrated perishable agri-products scheduling problem that combines harvest and distribution simultaneously, with the purpose of reducing processing time and quality decay. We propose this problem as a mixed integer nonlinear programming model (MINLP to optimize the harvest time and the vehicle routing to consumers, and this MINIP is formulated as a vehicle routing problem with time windows (VRPTW. We introduce a big M method to transform the nonlinear model into a linear model, then apply CPLEX to solve the transformed model. Numerical experiments and sensitive analysis are conducted to verify the efficiency of the proposed model and to provide managerial insights.

  18. The Impact of a Rigorous Multiple Work Shift Schedule and Day Versus Night Shift Work on Reaction Time and Balance Performance in Female Nurses: A Repeated Measures Study.

    Science.gov (United States)

    Thompson, Brennan J; Stock, Matt S; Banuelas, Victoria K; Akalonu, Chibuzo C

    2016-07-01

    The aim of this study was to determine the impact of a demanding work schedule involving long, cumulative work shifts on response time and balance-related performance outcomes and to evaluate the prevalence of musculoskeletal disorders between day and night shift working nurses. A questionnaire was used to identify the prevalence of past (12-month) and current (7-day) musculoskeletal disorders. Nurses worked three 12-hour work shifts in a 4-day period. Reaction time and balance tests were conducted before and after the work period. The work period induced impairments for reaction time, errors on reaction time tasks, and balance performance, independent of shift type. Musculoskeletal symptom prevalence was high in workers of both work shifts. Compressed work shifts caused performance-based fatigue in nurses. Reaction time and balance tests may be sensitive fatigue identification markers in nurses.

  19. Estimating exponential scheduling preferences

    DEFF Research Database (Denmark)

    Hjorth, Katrine; Börjesson, Maria; Engelson, Leonid

    Extended abstract Choice of departure time is a travel choice dimension that transportation planners often need to forecast in appraisal. A traveller may shift departure time in response to changes in expected travel time or travel time variability (TTV) or in response to time-differentiated cong......Extended abstract Choice of departure time is a travel choice dimension that transportation planners often need to forecast in appraisal. A traveller may shift departure time in response to changes in expected travel time or travel time variability (TTV) or in response to time...... from the underlying scheduling preferences (Noland and Small, 1995, Bates et al., 2001, Fosgerau and Karlström, 2010). The scheduling preferences can be formally represented as time-dependent rates of utility derived at different locations. Assuming that the travellers are rational and choose departure......’ departure time choice. The assumption underlying the scheduling approach is that the traveller rationally maximises her total utility obtained during a period of time. The total utility depends on time of departure from the origin and time of arrival to the destination. The total utility is usually assumed...

  20. Is the growth stimulation by low doses of glyphosate sustained over time?

    International Nuclear Information System (INIS)

    Cedergreen, Nina

    2008-01-01

    The herbicide, glyphosate, has been shown to stimulate growth in a range of species when applied at doses of 5-60 g a.e. ha -1 , corresponding to realistic spray drift events. This study investigates growth of shoot parameters over time to detect whether the glyphosate induced growth increase was sustained and had a final effect on reproduction. The results showed that an actual biomass growth rate increase took place within the first week after spraying with glyphosate doses -1 . This initial growth boost kept treated plants larger than untreated plants for up to six weeks, but at harvest there was no significant difference between control plants and treated plants. Possible effects of glyphosate hormesis on the competitive ability of spray drift affected plants are discussed. - Glyphosate induced hormesis in barley is not sustained over time