WorldWideScience

Sample records for digital upgrade project

  1. Industry perspective on digital upgrades: A utility perspective on digital upgrades

    International Nuclear Information System (INIS)

    Blauw, R.J.

    1994-01-01

    Nuclear utilities face the need to upgrade aging and obsolete safety related and other critical equipment. This is the result of operation and maintenance concerns for reliability and maintainability. Digital technology is an option for these upgrades. A number of utilities have attempted exercising the digital option. The regulatory licensing results have been inconsistent and have raised a variety of issues. These issues and the subsequent licensing uncertainties have caused some utilities to temporarily drop digital technology as an upgrade option. Resolution of these issues and the need for regulatory stability is driving the development of industry standards and guidelines. These will provide guidance to support consistent design and implementation of digital upgrades. Successful completion of these documents is necessary for renewed consideration of the use of digital technology. This paper will present a utility perspective on how project management, configuration control, and a rigorous design process can serve to address the present regulatory issues. These issues include commercial grade dedication, reliability, electromagnetic interference, and failure and error management. This perspective is consistent with the standards and guidelines development effort

  2. Lessons learned in digital upgrade projects digital control system implementation at US nuclear power stations

    International Nuclear Information System (INIS)

    Kelley, S.; Bolian, T. W.

    2006-01-01

    AREVA NP has gained significant experience during the past five years in digital upgrades at operating nuclear power stations in the US. Plants are seeking modernization with digital technology to address obsolescence, spare parts availability, vendor support, increasing age-related failures and diminished reliability. New systems offer improved reliability and functionality, and decreased maintenance requirements. Significant lessons learned have been identified relating to the areas of licensing, equipment qualification, software quality assurance and other topics specific to digital controls. Digital control systems have been installed in non safety-related control applications at many utilities within the last 15 years. There have also been a few replacements of small safety-related systems with digital technology. Digital control systems are proving to be reliable, accurate, and easy to maintain. Digital technology is gaining acceptance and momentum with both utilities and regulatory agencies based upon the successes of these installations. Also, new plants are being designed with integrated digital control systems. To support plant life extension and address obsolescence of critical components, utilities are beginning to install digital technology for primary safety-system replacement. AREVA NP analyzed operating experience and lessons learned from its own digital upgrade projects as well as industry-wide experience to identify key issues that should be considered when implementing digital controls in nuclear power stations

  3. Analogue to digital upgrade project-boiler feedwater control system for Bruce Power nuclear units 1 & 2

    International Nuclear Information System (INIS)

    Long, R.

    2012-01-01

    Bruce Power Nuclear Generating Station A, “Bruce A” is in the final stages of its Restart Project. This capital project will see a large scale rehabilitation of Units 1 and 2 resulting in addition of 1500MW of safe, reliable, clean electricity to the Ontario grid. Restart Project Scope 375, Boiler Feedwater Controls Upgrade was sanctioned to replace obsolete analog devices with a modern digital control system. This project replaced the existing Foxboro H Line analog controls which comprised of 81 individual control modules and support instrumentation. The replacement system was a Triconex Triple Modular Redundant PLC which interfaces with two redundant touch screen monitors. The upgraded digital system incorporates the following controls: 1. Boiler Level Control Loops 2. Dearator Level Control Loops 3. Dearator Pressure Control Loops 4. Boiler Feedwater Recirculation Flow Control Loops A number of technical challenges were addressed when installing a new digital system within the existing plant configuration. Interfaces to new, old and refurbished field devices must be understood as well as implications of connecting to the plant’s Digital Control Computers (DCC’s) and newly installed Steam Generators. The overall project involved many stakeholders to address various requirements from conceptual / design stage through procurement, construction, commissioning and return to service. In addition, the project highlighted the unique requirements found in Nuclear Industry with respect to Human Factors and Software Quality Assurance. (author)

  4. Reflections on a digital upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Tadjalli, M.

    2013-07-01

    Upon receiving US NRC's approval in 2010, the first RPS/ESPS digital upgrade using TELEPERM® XS technology was successfully installed in Spring of 2011 at the first Unit of a three-unit station, followed by the 2nd Unit installation in spring of 2012. Both Units' systems have been operating flawlessly since installation. After about two years of operation, a reflection on digital upgrades and lessons learned, from a vendor perspective, provides valuable insight for the commercial nuclear power industry.

  5. Total cost of performing analog-to-digital upgrades

    International Nuclear Information System (INIS)

    Albrigo, T.

    1993-01-01

    The financial well-being of nuclear power plants in the United States is dependent on reducing costs. Rapid advances in industrial technology have created a conundrum for utility executives and their engineering staffs. Digital technology is being touted as beneficial in many ways; however, a number of significant issues have been raised regarding the adequacy and financial viability of digital systems in nuclear power plants. Actual or perceived problems with digital system design, development, and installation have caused significant financial losses for nuclear utilities. This paper provides a list of problems that must be considered in performing an analog-to-digital conversion or for doing a large digital upgrade. It is desirable that the full financial risks associated with these types of upgrades are considered. Specific problems encountered at Palo Verde nuclear generating station are reviewed to emphasize some of the problem areas

  6. CANDU Digital Control Computer upgrade options

    International Nuclear Information System (INIS)

    De Jong, M.S.; De Grosbois, J.; Qian, T.

    1997-01-01

    This paper reviews the evolution of Digital Control Computers (DCC) in CANDU power plants to the present day. Much of this evolution has been to meeting changing control or display requirements as well as the replacement of obsolete, or old and less reliable technology with better equipment that is now available. The current work at AECL and Canadian utilities to investigate DCC upgrade options, alternatives, and strategies are examined. The dependence of a particular upgrade strategy on the overall plant refurbishment plans are also discussed. Presently, the upgrade options range from replacement of individual obsolete system components, to replacement of the entire DCC hardware without changing the software, to complete replacement of the DCCs with a functionally equivalent system using new control computer equipment and software. Key issues, constraints and objectives associated with these DCC upgrade options are highlighted. (author)

  7. EPRI training to support digital upgrades in nuclear plants

    International Nuclear Information System (INIS)

    Torok, R.; Naser, J.

    2006-01-01

    In response to the growing challenges of obsolescence and rising maintenance costs, utilities are increasingly upgrading or replacing their existing instrumentation and control (I and C) systems and components. In most cases, this involves analog-to-digital or digital-to-newer-digital replacements. However, the use of digital technology often raises new technical and licensing issues, particularly for safety-related applications. Examples include: new failure modes and the potential for common-mode failure of redundant components; electromagnetic compatibility (EMC); potential human-system interface problems; and software verification, validation, and configuration management. Successful implementation, operation and maintenance of digital systems depend to a great extent on having processes in place that are tailored for digital technology. Nuclear plants are therefore updating their processes as they start the migration to digital I and C. For several years, EPRI has been developing guidelines to address the key technical issues and interfacing with the U.S. NRC to ensure the acceptability of the approaches developed. A framework for implementing digital upgrades now exists, but practical experience under the current regulatory environment is sparse. Significant uncertainty exists in regard to both technical and licensing issues. Many utilities still need to prepare their staff and processes to properly handle the new technology. In recent years, this need has been exacerbated by staff reductions, changing job assignments, and declining training budgets. EPRI has responded by developing a training program to help utilities efficiently bring design and licensing engineers up to speed on the latest issues and guidance affecting the implementation of digital upgrades in nuclear plants. This paper describes the key technical issues in the context of the EPRI training program. (authors)

  8. Experiences upgrading a fluoroscopic system to digital specifications

    International Nuclear Information System (INIS)

    Fox, T.; Fenzl, G.

    1995-01-01

    In 1993, an undertable fluoroscopic system was retrofitted with a Fluorospot HC digital system at the radiological clinic of the Knappschaftskrankenhaus in Puettlingen, Germany. The experiences and possibilities resulting from this digital upgrade are related by the authors, whose narrative is also accompanied by examples of clinical images. The costs involved are also discussed in this article. (orig.)

  9. Project W-420 stack monitoring system upgrades

    International Nuclear Information System (INIS)

    CARPENTER, K.E.

    1999-01-01

    This project will execute the design, procurement, construction, startup, and turnover activities for upgrades to the stack monitoring system on selected Tank Waste Remediation System (TWRS) ventilation systems. In this plan, the technical, schedule, and cost baselines are identified, and the roles and responsibilities of project participants are defined for managing the Stack Monitoring System Upgrades, Project W-420

  10. THE DEVELOPMENT OF DETAILED HUMAN FACTORS ENGINEERING GUIDELINES FOR DIGITAL CONTROL ROOM UPGRADES

    International Nuclear Information System (INIS)

    BROWN, W.; O'HARA, J.M.

    2004-01-01

    As part of the Department of Energy and Electric Power Research Institute's hybrid control room project, detailed human factors engineering guidance was developed for designing human-system interfaces that may be affected by introduction of additional digital technology during modernization of nuclear power plants. The guidance addresses several aspects of human-system interaction: information display, interface management, soft controls, alarms, computer-based procedures, computerized operator support systems, communications, and workstation/workplace design. In this paper, the ways in which digital upgrades might affect users' interaction with systems in each of these contexts are briefly described, and the contents of the guidance developed for each of the topics is also described

  11. Some aspects of digital I and C and digital human-system interface upgrades in nuclear power plants

    International Nuclear Information System (INIS)

    Mandic, D.

    2005-01-01

    Digital I and C technology introduces some new terms and new processes like software life cycle, process computer configuration control, digital human-system interface (HSI), software V and V (Verification and Validation), software common mode failure potential, software documentation, etc. Based on the experience from NEK, and other NPPs and published reports from other organizations, this paper sheds light on challenging tasks related to some aspects of the digital I and C upgrades and especially the NPP MCR/MCB HSI (Nuclear Power Plant Main Control Room / Main Control Board Human-System Interface) upgrade. The Ref. [1], EPRI Report TR-1008122 was used as a guidance to analyze original NEK MCR/MCB HSI design (1970s), to describe migration from the original MCR/MCB HSI design to the 2005 AS-BUILT status and to propose the authors vision for the key planning aspects for I and C upgrades and MCR modernization. This paper submits the justified proposal for the endpoint vision and the migration path applicable to NEK MCR/MCB HSI modernization, as well as some of the possible risks and lessons learned. (author)

  12. Managing RTP Console Upgrading Project: Best Practice for Nuclear Malaysia as TSO in Supporting NPP Development

    International Nuclear Information System (INIS)

    Nurfarhana Ayuni Joha; Syahirah Abdul Rahman; Izhar Abu Hussin

    2011-01-01

    Human Resource Development (HRD) is required for Nuclear Power Programme (NPP). To be a Technical Support Organisation (TSO) for NPP, Nuclear Malaysia should be ready to take the responsibility in supporting Nuclear Regulatory Agency (NRA) and NPP Operators. In nurturing Nuclear Malaysia as TSO, the prime important and focus of HRD for the NPP is the reactor engineering technology. Nuclear Malaysia gives various phases of supports needed to build NPP such as during siting, design, planning, licensing, construction, commissioning, operation and maintenance in its own way and capability. The current Nuclear Malaysia unique approach is the TRIGA PUSPATI reactor (RTP) upgrading project. Research reactor plays an important role in Research and Developpement organization as a nuclear facility to assist the development of NPP. Therefore, upgrading the research reactor is needed to build the skills and gain knowledge of workers to work safely. After 29 years of operation, the RTP system is facing aging problems due to many components in the reactor are outdated. Therefore, immediate action should be carried out to mitigate the aging factor of the reactor to prevent the worsening of the aging problem, and to prevent untoward incident from happening. Action should also cover short and long term planning to prevent current situation from recurring. Currently, RTP is upgrading its console from analog to digital system. One of the achievements in this console upgrading project is the development and implementation of project management. This paper comprises the overview on the RTP console upgrading project, the project management and how this project can lead Nuclear Malaysia to be a good TSO for the development of NPP. (author)

  13. The Kyoto University tandem upgrading project

    International Nuclear Information System (INIS)

    Nakamura, Masanobu; Shimoura, Susumu; Takimoto, Kiyohiko; Sakaguchi, Harutaka; Kobayashi, Shinsaku

    1988-01-01

    A brief description on the Kyoto University tandem upgrading project. The project consists of replacing the old 5 MV tandem Van de Graaff by an 8UDH pelletron. The old pressure vessel and beam lines are used again without significant modification. The project is planned to be completed at the end of 1989. (orig.)

  14. Upgrade Analog Readout and Digitizing System for ATLAS TileCal Demonstrator

    CERN Document Server

    Tang, F; Anderson, K; Bohm, C; Hildebrand, K; Muschter, S; Oreglia, M

    2015-01-01

    The TileCal Demonstrator is a prototype for a future upgrade to the ATLAS hadron calorimeter when the Large Hadron Collider increases luminosity in year 2023 (HL-LHC). It will be used for functionality and performance tests. The Demonstrator has 48 channels of upgraded readout and digitizing electronics and a new digital trigger capability, but is backwards-compatible with the present detector system insofar as it also provides analog trigger signals. The Demonstrator is comprised of 4 identical mechanical mini-drawers, each equipped with up to 12 photomultipliers (PMTs). The on-detector electronics includes 45 Front-End Boards, each serving an individual PMT; 4 Main Boards, each to control and digitize up to 12 PMT signals, and 4 corresponding high-speed Daughter Boards serving as data hubs between on-detector and off-detector electronics. The Demonstrator is fully compatible with the present system, accepting ATLAS triggers, timing and slow control commands for the data acquisition, detector control, and de...

  15. Abnormal condition and events analysis for instrumentation and control systems. Volume 1: Methodology for nuclear power plant digital upgrades. Final report

    International Nuclear Information System (INIS)

    McKemy, S.; Marcelli, M.; Boehmer, N.; Crandall, D.

    1996-01-01

    The ACES project was initiated to identify a cost-effective methodology for addressing abnormal conditions and events (ACES) in digital upgrades to nuclear power plant systems, as introduced by IEEE Standard 7-4.3.2-1993. Several methodologies and techniques currently in use in the defense, aerospace, and other communities for the assurance of digital safety systems were surveyed, and although several were shown to possess desirable qualities, non sufficiently met the needs of the nuclear power industry. This report describes a tailorable methodology for performing ACES analysis that is based on the more desirable aspects of the reviewed methodologies and techniques. The methodology is applicable to both safety- and non-safety-grade systems, addresses hardware, software, and system-level concerns, and can be applied in either a lifecycle or post-design timeframe. Employing this methodology for safety systems should facilitate the digital upgrade licensing process

  16. Design concepts for the reactor protection and control process instrumentation digital upgrade project at the Donald C. Cook Nuclear Plant units 1 and 2

    International Nuclear Information System (INIS)

    Carruth, R.C.; Sotos, W.G.

    1996-01-01

    As the nation's nuclear power plants age, the need to consider upgrading of their electronic protection and control systems becomes more urgent. Hardware obsolescence and mechanical wear out resulting from frequent calibration and surveillance play a major role in defining their useful life. At Cook Nuclear Plant, a decision was made to replace a major portion of the plant's protection and control systems with newer technology. This paper describes the engineering processes involved in this successful upgrade and explains the basis for many decisions made while performing the digital upgrade

  17. CMS pixel upgrade project

    CERN Document Server

    Kaestli, Hans-Christian

    2010-01-01

    The LHC machine at CERN finished its first year of pp collisions at a center of mass energy of 7~TeV. While the commissioning to exploit its full potential is still ongoing, there are plans to upgrade its components to reach instantaneous luminosities beyond the initial design value after 2016. A corresponding upgrade of the innermost part of the CMS detector, the pixel detector, is needed. A full replacement of the pixel detector is planned in 2016. It will not only address limitations of the present system at higher data rates, but will aggressively lower the amount of material inside the fiducial tracking volume which will lead to better tracking and b-tagging performance. This article gives an overview of the project and illuminates the motivations and expected improvements in the detector performance.

  18. CMS pixel upgrade project

    CERN Document Server

    INSPIRE-00575876

    2011-01-01

    The LHC machine at CERN finished its first year of pp collisions at a center of mass energy of 7 TeV. While the commissioning to exploit its full potential is still ongoing, there are plans to upgrade its components to reach instantaneous luminosities beyond the initial design value after 2016. A corresponding upgrade of the innermost part of the CMS detector, the pixel detector, is needed. A full replacement of the pixel detector is planned in 2016. It will not only address limitations of the present system at higher data rates, but will aggressively lower the amount of material inside the fiducial tracking volume which will lead to better tracking and b-tagging performance. This article gives an overview of the project and illuminates the motivations and expected improvements in the detector performance.

  19. Project scenarios for bitumen upgrading

    International Nuclear Information System (INIS)

    Koppel, P.E.; Mazurek, W.L.; Harji, A.

    2002-01-01

    The established reserves of Alberta's heavy oil resources are 178 billion barrels, and potential recoverable reserves are 315 billion barrels. The challenge of production includes the logistics of recovery, upgrading and transportation to market. Utilization of the bitumen is not simple because bitumen is too viscous to transport by pipeline. In addition, it is not processable by most existing refineries unless it can be upgraded through dilution. This paper examined different factors regarding the economic viability of various upgrading methods of a wide range of bitumen feedstocks. The study also examined the sensitivity of refinery demand to the prices of these feedstocks, along with the competitiveness among bitumen-based feedstock and conventional crudes. Western Canada, Ontario and the PADD II district in the United States are the 3 major markets for western Canadian bitumen based feedstock, the demand for which depends on refinery configurations and asphalt demand. This paper described the following 4 generic scenarios that describe Alberta bitumen upgrading projects: (1) adjacent to open pit mines, (2) adjacent to steam assisted gravity drainage (SAGD) facilities, (3) remotely located from resource production at an existing refinery, and (4) pipeline bitumen. It was noted that producers should determine the best way to upgrade the bitumen to ensure there is an economic market for the product, but they should also be aware not to over process the bitumen so as not to leave existing refinery facilities under-utilized. 2 refs., 1 tab., 3 figs

  20. Project managing your simulator DCS upgrade

    International Nuclear Information System (INIS)

    Carr, S.

    2006-01-01

    The intention of this paper is to provide helpful information and tips for the purchaser with regard to the project management of a DCS upgrade for an existing nuclear power station operator-training simulator. This paper was written shortly after STS Powergen completed two nuclear power station simulator DCS projects in the USA. Areas covered by this paper are: - Contractual documents and arrangements; - Licence and Escrow agreements; - Liquidated damages; - Project management; - Project schedules and resources; - Monitoring progress; - Defect reporting; - DCS automation code; - Access to proprietary information; - Tips for project meetings; - Testing; - Cultural issues; - Training

  1. FPGAs Emulate Microprocessors-A Successful Case for HFC NPP Digital I and C Upgrade

    International Nuclear Information System (INIS)

    Hsu, Allen; Crow, Ivan; Reese, Carl; Kim, Jong; Yang, Steve

    2014-01-01

    Field Programmable Gate Arrays (FPGAs), as programmable logic devices (PLDs) have gained a great deal of interests for implementing safety I and C applications in nuclear power plants (NPPs) largely owing to the FPGAs'potential advantage over the currently more common microprocessor-based digital I and C applications. First of all, FPGAs have adequate capabilities for most digital I and C applications in NPPs. Secondly, FPGAs provide products with longer lifetime, improve testability, and reduce the drift which occurs in analog-based systems, from hardware perspective. Thirdly, FPGAs, from software perspective, can be made simpler, less reliant on complex software such as operating systems, which should make FPGAs easier to qualify for nuclear safety applications. Fourthly, FPGAs are less vulnerable to cyber attacks when FPGAs implement the I and C systems that do not contain high-level, general purpose software that may be easily subjected to malicious modifications. Finally, FPGAs can bring cost reduction in an I and C digital upgrade because FPGAs can provide simpler licensing process than microprocessor-based digital I and C, and FPGAs can be implemented more efficiently. This paper will present one successful case for YGN Unit I and C upgrade using FPGA-based components to replace the obsolete Intel 8085 Microprocessor-based controllers. In this case, FPGAs emulated the process of the existing microprocessors and interpreted the execution of CPU processing. More than 160 of the FPGA-based SBC-01 controllers replacing the Intel 8085 Microprocessor-based Printed Circuit Boards have been installed and running successfully for safety I and C applications over the last five years. In this upgrade, the new FPGA-based controller board SBC-01 emulated the functions of Intel 8085 microprocessor correctly. It is a successful and cost-effective upgrade.vIn this paper, lifecycle design and implementation process and rigorous V and V activities that were used in the

  2. FPGAs Emulate Microprocessors-A Successful Case for HFC NPP Digital I and C Upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Hsu, Allen; Crow, Ivan; Reese, Carl; Kim, Jong; Yang, Steve [Doosan HF Controls Corp, Carrollton (United States)

    2014-08-15

    Field Programmable Gate Arrays (FPGAs), as programmable logic devices (PLDs) have gained a great deal of interests for implementing safety I and C applications in nuclear power plants (NPPs) largely owing to the FPGAs'potential advantage over the currently more common microprocessor-based digital I and C applications. First of all, FPGAs have adequate capabilities for most digital I and C applications in NPPs. Secondly, FPGAs provide products with longer lifetime, improve testability, and reduce the drift which occurs in analog-based systems, from hardware perspective. Thirdly, FPGAs, from software perspective, can be made simpler, less reliant on complex software such as operating systems, which should make FPGAs easier to qualify for nuclear safety applications. Fourthly, FPGAs are less vulnerable to cyber attacks when FPGAs implement the I and C systems that do not contain high-level, general purpose software that may be easily subjected to malicious modifications. Finally, FPGAs can bring cost reduction in an I and C digital upgrade because FPGAs can provide simpler licensing process than microprocessor-based digital I and C, and FPGAs can be implemented more efficiently. This paper will present one successful case for YGN Unit I and C upgrade using FPGA-based components to replace the obsolete Intel 8085 Microprocessor-based controllers. In this case, FPGAs emulated the process of the existing microprocessors and interpreted the execution of CPU processing. More than 160 of the FPGA-based SBC-01 controllers replacing the Intel 8085 Microprocessor-based Printed Circuit Boards have been installed and running successfully for safety I and C applications over the last five years. In this upgrade, the new FPGA-based controller board SBC-01 emulated the functions of Intel 8085 microprocessor correctly. It is a successful and cost-effective upgrade.vIn this paper, lifecycle design and implementation process and rigorous V and V activities that were used in the

  3. Kongiganak Wind Turbine Replacement and System Upgrade Project

    Energy Technology Data Exchange (ETDEWEB)

    Boonstra, Patrick [Intelligent Energy Systems, Anchorage, AK (United States)

    2016-12-13

    The Native Village of Kongiganak, Alaska was awarded a grant to upgrade the braking systems on five wind turbines and upgrade the monitoring and data collection unit to insure that enough energy is available to power the utility. The project manager for this award is Intelligent Energy Systems, LLC located in Anchorage, Alaska. In addition to accomplishing these upgrades, it was the intent for a local wind tech crew to be trained in Kongiganak so that routine maintenance and future repairs will be made by local workers.

  4. Digital upgrade of radiation-monitoring-system subcomponents

    International Nuclear Information System (INIS)

    Bohrisch, R.L

    1993-01-01

    This paper describes the experience of Southern California Edison (SCE) in upgrading an obsolete, analog, printed circuit board contain in most of the process and effluent radiation detectors at the San Onofre Nuclear Generating Station. The printed circuit board, which functions to produce a linear voltage and current that is proportional to the log of the radiation level, was reengineered by SCE with microprocessor-based digital technology and subjected to qualification testing, including seismic and environmental, for use in class I safety-related applications. The results, benefits, and disadvantages to this approach are discussed in this paper

  5. Digital signal array processor for NSLS booster power supply upgrade

    International Nuclear Information System (INIS)

    Olsen, R.; Dabrowski, J.; Murray, J.

    1993-01-01

    The booster at the NSLS is being upgraded from 0.75 to 2 pulses per second. To accomplish this, new power supplied for the dipole, quadrupole, and sextupole have been installed. This paper will outline the design and function of the digital signal processor used as the primary control element in the power supply control system

  6. CMOS cassette for digital upgrade of film-based mammography systems

    Science.gov (United States)

    Baysal, Mehmet A.; Toker, Emre

    2006-03-01

    While full-field digital mammography (FFDM) technology is gaining clinical acceptance, the overwhelming majority (96%) of the installed base of mammography systems are conventional film-screen (FSM) systems. A high performance, and economical digital cassette based product to conveniently upgrade FSM systems to FFDM would accelerate the adoption of FFDM, and make the clinical and technical advantages of FFDM available to a larger population of women. The planned FFDM cassette is based on our commercial Digital Radiography (DR) cassette for 10 cm x 10 cm field-of-view spot imaging and specimen radiography, utilizing a 150 micron columnar CsI(Tl) scintillator and 48 micron active-pixel CMOS sensor modules. Unlike a Computer Radiography (CR) cassette, which requires an external digitizer, our DR cassette transfers acquired images to a display workstation within approximately 5 seconds of exposure, greatly enhancing patient flow. We will present the physical performance of our prototype system against other FFDM systems in clinical use today, using established objective criteria such as the Modulation Transfer Function (MTF), Detective Quantum Efficiency (DQE), and subjective criteria, such as a contrast-detail (CD-MAM) observer performance study. Driven by the strong demand from the computer industry, CMOS technology is one of the lowest cost, and the most readily accessible technologies available for FFDM today. Recent popular use of CMOS imagers in high-end consumer cameras have also resulted in significant advances in the imaging performance of CMOS sensors against rivaling CCD sensors. This study promises to take advantage of these unique features to develop the first CMOS based FFDM upgrade cassette.

  7. Regulatory requirements for replacement of analog systems with digital upgrades

    International Nuclear Information System (INIS)

    Loeser, P.J.

    1993-01-01

    This paper reviews briefly the regulatory guidelines which must be met in order to replace analog systems in nuclear power plants with digital systems. There is a move to do such replacements for a number of reasons: analog systems are aging, and showing considerable drift; few vendors manufacture analog systems today; support and parts are hard to get; digital systems provide flexibility. There is a safety concern however about undesirable and unpredictable effects to digital safety equipment due to plant transients, accidents, post-accident condition, and EMI/RF environmental interferences. License holders must comply with the requirements of 10 C.F.R. 50.59, which deals with safety concerns with respect to any changes to operating plants which may have an impact on the safety of the plant. NRC staff is taking the position that all digital upgrades will require an evaluation under this regulation

  8. Digital I and C system upgrade integration technique

    Energy Technology Data Exchange (ETDEWEB)

    Huang, H. W. [Inst. of Nuclear Energy Research (INER), No. 1000, Wenhua Road, Chiaan Village, Longtan Township, Taoyuan County, 32546, Taiwan (China); Shih, C. [Inst. of Nuclear Engineering and Science, National Tsing Hua Univ., 101, Sec. 2, Kuang Fu Rd, Hsinchu, Taiwan (China); Wang, J. R. [Inst. of Nuclear Energy Research (INER), No. 1000, Wenhua Road, Chiaan Village, Longtan Township, Taoyuan County, 32546, Taiwan (China); Huang, K. C. [Inst. of Nuclear Engineering and Science, National Tsing Hua Univ., 101, Sec. 2, Kuang Fu Rd, Hsinchu, Taiwan (China)

    2012-07-01

    This work developed an integration technique for digital I and C system upgrade, the utility can replace the I and C systems step by step systematically by this method. Inst. of Nuclear Energy Research (INER) developed a digital Instrumentation and Control (I and C) replacement integration technique on the basis of requirement of the three existing nuclear power plants (NPPs), which are Chin-Shan (CS) NPP, Kuo-Sheng (KS) NPP, and Maanshan (MS) NPP, in Taiwan, and also developed the related Critical Digital Review (CDR) Procedure. The digital I and C replacement integration technique includes: (I) Establishment of Nuclear Power Plant Digital Replacement Integration Guideline, (2) Preliminary Investigation on I and C System Digitalization, (3) Evaluation on I and C System Digitalization, and (4) Establishment of I and C System Digitalization Architectures. These works can be a reference for performing I and C system digital replacement integration of the three existing NPPs of Taiwan Power Company (TPC). A CDR is the review for a critical system digital I and C replacement. The major reference of this procedure is EPRI TR- 1011710 (2005) 'Handbook for Evaluating Critical Digital Equipment and Systems' which was published by the Electric Power Research Inst. (EPRI). With this document, INER developed a TPC-specific CDR procedure. Currently, CDR becomes one of the policies for digital I and C replacement in TPC. The contents of this CDR procedure include: Scope, Responsibility, Operation Procedure, Operation Flow Chart, CDR review items. The CDR review items include the comparison of the design change, Software Verification and Validation (SVandV), Failure Mode and Effects Analysis (FMEA), Evaluation of Diversity and Defense-in-depth (D3), Evaluation of Watchdog Timer, Evaluation of Electromagnetic Compatibility (EMC), Evaluation of Grounding for System/Component, Seismic Evaluation, Witness and Inspection, Lessons Learnt from the Digital I and C Failure

  9. Digital I and C system upgrade integration technique

    International Nuclear Information System (INIS)

    Huang, H. W.; Shih, C.; Wang, J. R.; Huang, K. C.

    2012-01-01

    This work developed an integration technique for digital I and C system upgrade, the utility can replace the I and C systems step by step systematically by this method. Inst. of Nuclear Energy Research (INER) developed a digital Instrumentation and Control (I and C) replacement integration technique on the basis of requirement of the three existing nuclear power plants (NPPs), which are Chin-Shan (CS) NPP, Kuo-Sheng (KS) NPP, and Maanshan (MS) NPP, in Taiwan, and also developed the related Critical Digital Review (CDR) Procedure. The digital I and C replacement integration technique includes: (I) Establishment of Nuclear Power Plant Digital Replacement Integration Guideline, (2) Preliminary Investigation on I and C System Digitalization, (3) Evaluation on I and C System Digitalization, and (4) Establishment of I and C System Digitalization Architectures. These works can be a reference for performing I and C system digital replacement integration of the three existing NPPs of Taiwan Power Company (TPC). A CDR is the review for a critical system digital I and C replacement. The major reference of this procedure is EPRI TR- 1011710 (2005) 'Handbook for Evaluating Critical Digital Equipment and Systems' which was published by the Electric Power Research Inst. (EPRI). With this document, INER developed a TPC-specific CDR procedure. Currently, CDR becomes one of the policies for digital I and C replacement in TPC. The contents of this CDR procedure include: Scope, Responsibility, Operation Procedure, Operation Flow Chart, CDR review items. The CDR review items include the comparison of the design change, Software Verification and Validation (SVandV), Failure Mode and Effects Analysis (FMEA), Evaluation of Diversity and Defense-in-depth (D3), Evaluation of Watchdog Timer, Evaluation of Electromagnetic Compatibility (EMC), Evaluation of Grounding for System/Component, Seismic Evaluation, Witness and Inspection, Lessons Learnt from the Digital I and C Failure Events. A

  10. UPGRADES

    CERN Multimedia

    J. Spalding and D. Contardo

    2012-01-01

      The CMS Upgrade Programme consists of four classes of projects: (a) Detector and Systems upgrades which are ongoing and largely (though not entirely) target LS1. (b) Full system upgrades for three projects that are preparing TDRs: Pixels, HCAL and L1 Trigger. The projects target completion by LS2. (c) Infrastructure consolidation and upgrades to improve operational robustness and to support the above projects. (d) Phase 2 replacement of the Tracker and major upgrades of the Trigger and Forward Detectors. For (a) and (c), detailed costing exists and is being integrated into a common reporting system. The schedule milestones for each project will be linked into the overall schedule planning for LS1. For the three TDR projects, the designs have progressed significantly since the Technical Proposal in 2010. Updated detailed cost estimates and schedules will be prepared with the TDRs to form the basis for tracking the projects through completion. To plan the upgrades and the supporting simulati...

  11. Project planning and management techniques of the fast-paced TMX-Upgrade construction

    International Nuclear Information System (INIS)

    Seberger, C.D.; Chargin, A.K.

    1981-01-01

    The Tandem Mirror Experiment-Upgrade (TMX-Upgrade) construction will be completed in 18 months at a total cost of $14.5 million. This paper describes the project planning and the management techniques used to complete the TMX-Upgrade within its allocated cost and schedule. In the planning stages of a project, before approval of the proposal, we define major project objectives, create a work breakdown structure (WBS), detail a technical description for each level of the WBS, and provide detailed bottoms-up cost estimates and summary schedules. In the operating phase, which continues throughout the project, we establish budget and schedule baselines. The reporting phase includes The Department of Energy (DOE) reviews of project status at monthly, quarterly, and semiannual intervals. These reports include cost, schedule, manpower, major procurement, and technical status information

  12. Prototype of time digitizing system for BESⅢ endcap TOF upgrade

    International Nuclear Information System (INIS)

    Cao Ping; Sun Weijia; Fan Huanhuan; Wang Siyu; Liu Shubin; An Qi; Ji Xiaolu

    2014-01-01

    The prototype of a time digitizing system for the BESⅢ endcap TOF (ETOF) upgrade is introduced in this paper. The ETOF readout electronics has a distributed architecture. Hit signals from the multi-gap resistive plate chamber (MRPC) are signaled as LVDS by front-end electronics (FEE) and are then sent to the back-end time digitizing system via long shield differential twisted pair cables. The ETOF digitizing system consists of two VME crates, each of which contains modules for time digitization, clock, trigger, fast control, etc. The time digitizing module (TDIG) of this prototype can support up to 72 electrical channels for hit information measurement. The fast control (FCTL) module can operate in barrel or endcap mode. The barrel FCTL fans out fast control signals from the trigger system to the endcap FCTLs, merges data from the endcaps and then transfers to the trigger system. Without modifying the barrel TOF (BTOF) structure, this time digitizing architecture benefits from improved ETOF performance without degrading the BTOF performance. Lab experiments show that the time resolution of this digitizing system can be lower than 20 ps, and the data throughput to the DAQ can be about 92 Mbps. Beam experiments show that the total time resolution can be lower than 45 ps. (authors)

  13. Proceedings: Electromagnetic interference control in modern digital instrumentation and control upgrades

    International Nuclear Information System (INIS)

    1993-06-01

    A workshop on Electro-Magnetic Interference (EMI) Control in Modern Digital Instrumentation ampersand Control System Upgrade was held in Baltimore on September 10-11, 1992 to provide a forum for technology transfer, technical information exchange, and education. The workshop was attended by more than 70 representatives of electric utilities, equipment manufacturers, engineering consulting organizations, and government agencies. The workshop consists of four sessions: (1) Organizational EMC Perspectives, (2) EMI Environment, Case Histories ampersand Solutions, (3) EMC in Digital Instrumentation ampersand Control Systems, and (4) EMI Utility Needs. A group discussion followed the presentations to identify utility needs. Individual papers have been cataloged separately

  14. Project W-314 241-AN-A valve pit upgrade acceptance for beneficial use

    Energy Technology Data Exchange (ETDEWEB)

    HAMMERS, J.S.

    1999-07-21

    This report identifies the responsibilities and requirements, applicable to the 241-AN-A Valve Pit Upgrades portion of Project W-314, for Acceptance for Beneficial Use in accordance with HNF-IP-0842, Vol IV, Sec 3.12. At project turnover, the end user accepts the affected Structures, Systems, and Components (SSCs) for beneficial use. This checklist is used to help the end user ensure that all documentation, training, and testing requirements are met prior to turnover. This checklist specifically identifies those items related to the upgrading of the 241-AN-A valve pit. The upgrades include: the installation of jumper/valve manifolds with position sensors, replacement pit leak detection systems, construction of replacement cover blocks, and electrical upgrades to support the instrumentation upgrades.

  15. Project W-314 241-AN-A valve pit upgrade acceptance for beneficial use

    International Nuclear Information System (INIS)

    HAMMERS, J.S.

    1999-01-01

    This report identifies the responsibilities and requirements, applicable to the 241-AN-A Valve Pit Upgrades portion of Project W-314, for Acceptance for Beneficial Use in accordance with HNF-IP-0842, Vol IV, Sec 3.12. At project turnover, the end user accepts the affected Structures, Systems, and Components (SSCs) for beneficial use. This checklist is used to help the end user ensure that all documentation, training, and testing requirements are met prior to turnover. This checklist specifically identifies those items related to the upgrading of the 241-AN-A valve pit. The upgrades include: the installation of jumper/valve manifolds with position sensors, replacement pit leak detection systems, construction of replacement cover blocks, and electrical upgrades to support the instrumentation upgrades

  16. A study on the digital image transfer application mass chest X-ray system up-grade

    International Nuclear Information System (INIS)

    Kim, Sun Chil; Park, Jong Sam; Lee, Jon Il

    2003-01-01

    By converting movable indirect mass chest X-ray devices for vehicles into digital systems and upgrading it to share information with the hospital's medical image information system, excellencies have been confirmed as a result of installing and running this type of system and are listed hereinafter. Upgrading analog systems, such as indirect mass chest X-ray devices dependent on printed film, to digital systems allows them to be run and managed much more efficiently, contributing to the increase in the stability and the efficiency of the system. Unlike existing images, communication based on DICOM standards allow images to be compatible with the hospital's outer and inner network PACS systems, extending the scope of the radiation departments information system. Assuming chest-exclusive indirect mass chest X-rays, a linked development of CAD (Computer Aided Diagnosis, Detector) becomes possible. By applying wireless Internet, Web-PACS for movable indirect mass chest X-ray devices for vehicles will become possible. Research in these fields must continue and if the superior image quality and convenience of digital systems are confirmed, I believe that the conversion of systems still dependent on analog images to modernized digital systems is a must

  17. Project W-030 safety class upgrade summary report

    International Nuclear Information System (INIS)

    Kriskovich, J.R.

    1998-01-01

    This document presents a summary of safety class criteria for the 241-AY/AZ Tank Farm primary ventilation system upgrade under Project W-030, and recommends acceptance of the system as constructed, based on a review of supporting documentation

  18. TA-55 facility control system upgrade project - human-system interface functional requirements

    International Nuclear Information System (INIS)

    Atkins, W.H.; Pope, N.G.; Turner, W.J.; Brown, R.E.

    1995-11-01

    The functional requirements for that part of the Technical Area (TA)-55 Operations Center Upgrade Project that involves the human-system interface (HSI) are described in this document. The upgrade project seeks to replace completely the center's existing computerized data acquisition and display system, which consists of the field multiplexer units, Data General computer systems, and associated peripherals and software. The upgrade project has two parts-the Facility Data Acquisition Interface System (FDAIS) and the HSI. The HSI comprises software and hardware to provide a high-level graphical operator interface to the data acquisition system, as well as data archiving, alarm annunciation, and logging. The new system will be built with modern, commercially available components; it will improve reliability and maintainability, and it can be expanded for future needs

  19. Fault tree analysis of Project S-4404, Upgrade Canyon Exhaust System

    International Nuclear Information System (INIS)

    Browne, E.V.; Low, J.M.; Lux, C.R.

    1992-01-01

    Project S-4404, Upgrade Canyon Exhaust Systems, is a $177 million project with the purpose of upgrading the Exhaust Systems for both F and H Canyon Facilities. This upgrade will replace major portions of the F and H-Canyon exhaust systems, downstream of their respective sand filters with higher capacity and more reliable systems. Because of the high cost, DOE requested Program Control ampersand Integration (PC ampersand I) to examine specific deletions to the project. PC ampersand I requested Nuclear Processes Safety Research (NPSR) to perform an analysis to compare failure rates for the existing F ampersand H Canyon exhaust systems with the proposed exhaust system and specific proposed exhaust system alternatives. The objective of this work was to perform an analysis and compare failure rates for the existing F ampersand H Canyon exhaust systems with the proposed project exhaust system and proposed project alternatives. Based on fault tree analysis, two conclusions are made. First, D ampersand D activities can be eliminated from the project with no significant decrease to exhaust system safety. Deletion of D ampersand D activities would result in a cost savings of $29 million. Second, deletion of DOE Order 6430.1A requirements regarding DBAs would decrease exhaust system safety by a factor of 12

  20. Simulation of the High Performance Time to Digital Converter for the ATLAS Muon Spectrometer trigger upgrade

    International Nuclear Information System (INIS)

    Meng, X.T.; Levin, D.S.; Chapman, J.W.; Zhou, B.

    2016-01-01

    The ATLAS Muon Spectrometer endcap thin-Resistive Plate Chamber trigger project compliments the New Small Wheel endcap Phase-1 upgrade for higher luminosity LHC operation. These new trigger chambers, located in a high rate region of ATLAS, will improve overall trigger acceptance and reduce the fake muon trigger incidence. These chambers must generate a low level muon trigger to be delivered to a remote high level processor within a stringent latency requirement of 43 bunch crossings (1075 ns). To help meet this requirement the High Performance Time to Digital Converter (HPTDC), a multi-channel ASIC designed by CERN Microelectronics group, has been proposed for the digitization of the fast front end detector signals. This paper investigates the HPTDC performance in the context of the overall muon trigger latency, employing detailed behavioral Verilog simulations in which the latency in triggerless mode is measured for a range of configurations and under realistic hit rate conditions. The simulation results show that various HPTDC operational configurations, including leading edge and pair measurement modes can provide high efficiency (>98%) to capture and digitize hits within a time interval satisfying the Phase-1 latency tolerance.

  1. Tank farm restoration and safe operation, project W-314, upgrade scope summary report (USSR)

    International Nuclear Information System (INIS)

    Jacobson, R.W.

    1997-01-01

    This revision to the Project W-314 Upgrade Scope Summary Report (USSR), incorporates changes to the project scope from Alternative Generation Analysis (AGA), customer guidance, and changing requirements. It defines the actual upgrades currently in scope, and provides traceability to the requirements and/or drivers

  2. Design review report: 200 East upgrades for Project W-314, tank farm restoration and safe operations

    International Nuclear Information System (INIS)

    Boes, K.A.

    1998-01-01

    This Design Review Report (DRR) documents the contractor design verification methodology and records associated with project W-314's 200 East (200E) Upgrades design package. The DRR includes the documented comments and their respective dispositions for this design. Acceptance of the comment dispositions and closure of the review comments is indicated by the signatures of the participating reviewers. Project W-314 is a project within the Tank Waste Remediation System (TWRS) Tank Waste Retrieval Program. This project provides capital upgrades for the existing Hanford tank farm waste transfer, instrumentation, ventilation, and electrical infrastructure systems. To support established TWRS programmatic objectives, the project is organized into two distinct phases. The initial focus of the project (i.e., Phase 1) is on waste transfer system upgrades needed to support the TWRS Privatization waste feed delivery system. Phase 2 of the project will provide upgrades to support resolution of regulatory compliance issues, improve tank infrastructure reliability, and reduce overall plant operating/maintenance costs. Within Phase 1 of the W-314 project, the waste transfer system upgrades are further broken down into six major packages which align with the project's work breakdown structure. Each of these six sub-elements includes the design, procurement, and construction activities necessary to accomplish the specific tank farm upgrades contained within the package. The first design package (AN Valve Pit Upgrades) was completed in November 1997, and the associated design verification activities are documented in HNF-1893. The second design package, 200 East (200E) Upgrades, was completed in March 1998. This design package identifies modifications to existing valve pits 241-AX-B and 241-A-B, as well as several new waste transfer pipelines to be constructed within the A Farm Complex of the 200E Area. The scope of the valve pit modifications includes new pit cover blocks, valve

  3. CDF End Plug calorimeter Upgrade Project

    International Nuclear Information System (INIS)

    Apollinari, G.; de Barbaro, P.; Mishina, M.

    1994-01-01

    We report on the status of the CDF End Plug Upgrade Project. In this project, the CDF calorimeters in the end plug and the forward regions will be replaced by a single scintillator based calorimeter. After an extensive R ampersand D effort on the tile/fiber calorimetry, we have now advanced to a construction phase. We review the results of the R ampersand D leading to the final design of the calorimeters and the development of tooling devised for this project. The quality control program of the production of the electromagnetic and hadronic calorimeters is described. A shower maximum detector for the measurement of the shower centroid and the shower profile of electrons, γ and π 0 has been designed. Its performance requirements, R ampersand D results and mechanical design are discussed

  4. Fermilab Recycler Ring BPM Upgrade Based on Digital Receiver Technology

    Science.gov (United States)

    Webber, R.; Crisp, J.; Prieto, P.; Voy, D.; Briegel, C.; McClure, C.; West, R.; Pordes, S.; Mengel, M.

    2004-11-01

    Electronics for the 237 BPMs in the Fermilab Recycler Ring have been upgraded from a log-amplifier based system to a commercially produced digitizer-digital down converter based system. The hardware consists of a pre-amplifier connected to a split-plate BPM, an analog differential receiver-filter module and an 8-channel 80-MHz digital down converter VME board. The system produces position and intensity with a dynamic range of 30 dB and a resolution of ±10 microns. The position measurements are made on 2.5-MHz bunched beam and barrier buckets of the un-bunched beam. The digital receiver system operates in one of six different signal processing modes that include 2.5-MHz average, 2.5-MHz bunch-by-bunch, 2.5-MHz narrow band, unbunched average, un-bunched head/tail and 89-kHz narrow band. Receiver data is acquired on any of up to sixteen clock events related to Recycler beam transfers and other machine activities. Data from the digital receiver board are transferred to the front-end CPU for position and intensity computation on an on-demand basis through the VME bus. Data buffers are maintained for each of the acquisition events and support flash, closed orbit and turn-by-turn measurements. A calibration system provides evaluation of the BPM signal path and application programs.

  5. A digital correlator upgrade for the Arcminute MicroKelvin Imager

    Science.gov (United States)

    Hickish, Jack; Razavi-Ghods, Nima; Perrott, Yvette C.; Titterington, David J.; Carey, Steve H.; Scott, Paul F.; Grainge, Keith J. B.; Scaife, Anna M. M.; Alexander, Paul; Saunders, Richard D. E.; Crofts, Mike; Javid, Kamran; Rumsey, Clare; Jin, Terry Z.; Ely, John A.; Shaw, Clive; Northrop, Ian G.; Pooley, Guy; D'Alessandro, Robert; Doherty, Peter; Willatt, Greg P.

    2018-04-01

    The Arcminute Microkelvin Imager (AMI) telescopes located at the Mullard Radio Astronomy Observatory near Cambridge have been significantly enhanced by the implementation of a new digital correlator with 1.2 MHz spectral resolution. This system has replaced a 750-MHz resolution analogue lag-based correlator, and was designed to mitigate the effects of radio frequency interference, particularly that from geostationary satellites which are visible from the AMI site when observing at low declinations. The upgraded instrument consists of 18 ROACH2 Field Programmable Gate Array platforms used to implement a pair of real-time FX correlators - one for each of AMI's two arrays. The new system separates the down-converted RF baseband signal from each AMI receiver into two sub-bands, each of which are filtered to a width of 2.3 GHz and digitized at 5-Gsps with 8 bits of precision. These digital data streams are filtered into 2048 frequency channels and cross-correlated using FPGA hardware, with a commercial 10 Gb Ethernet switch providing high-speed data interconnect. Images formed using data from the new digital correlator show over an order of magnitude improvement in dynamic range over the previous system. The ability to observe at low declinations has also been significantly improved.

  6. Experience with safety assessment of digital upgrading of IandC in VVER type reactors

    International Nuclear Information System (INIS)

    Wach, D.; Mulka, B.; Schnuerer, G.

    1997-01-01

    The digital upgrading of IandC systems important to safety in WWER type reactors requires a broad expertise in various knowledge fields. The approach of the Institute for safety Technology to the qualification and categorization of safety-critical software systems is highlighted. The role of the Institute in the qualification of the Teleperm XS and the type testing of its components is described. The aspects of the safety assessment of digital IandC systems in WWER type reactors is discussed in some detail. (A.K.)

  7. Project W-420 Stack Monitoring system upgrades conceptual design report

    International Nuclear Information System (INIS)

    TUCK, J.A.

    1998-01-01

    This document describes the scope, justification, conceptual design, and performance of Project W-420 stack monitoring system upgrades on six NESHAP-designated, Hanford Tank Farms ventilation exhaust stacks

  8. Project W-420 Stack Monitoring system upgrades conceptual design report

    Energy Technology Data Exchange (ETDEWEB)

    TUCK, J.A.

    1998-11-06

    This document describes the scope, justification, conceptual design, and performance of Project W-420 stack monitoring system upgrades on six NESHAP-designated, Hanford Tank Farms ventilation exhaust stacks.

  9. DIII-D UPGRADE PROJECT FINAL REPORT FOR THE PERIOD OCTOBER 1, 1993 THROUGH MAY 31, 2003

    International Nuclear Information System (INIS)

    STAMBAUGH, RD

    2003-01-01

    OAK-B135 Under DOE Contracts DE-AC03-89ER51114 and DE-AC03-99ER54463 to General Atomics (GA), three ''capital project'' upgrade projects were accomplished on DIII-D from FY93 to FY03 at a total GA cost of $27.2M. These projects included the Fast Wave Current Drive (FWCD) Upgrade ($8.2M), the Radiative Divertor Upgrade ($7.2M) and the Electron Cyclotron Heating (ECH) Upgrade ($11.8M). The ECH and FWCD upgrades provided DIII-D rf and microwave power for electron heating, driving plasma current, controlling the plasma current profile, controlling tearing mode instabilities, and modulated transport studies.The divertor provided adequate density and impurity control for high triangularity single null plasmas in the Advanced Tokamak (AT) Program and information for International Thermonuclear Experimental Reactor (ITER) divertor design. These upgrades provide the power and density control required to initiate the active control of advanced tokamak discharges, which is the key element in the DIII-D program

  10. Qinshan 300Mwe NPP full scope simulator upgrade

    International Nuclear Information System (INIS)

    Qi Kelin; Li Qing; Liu Wei, Lai Shengyuan

    2006-01-01

    On April 28,2004, RINPO was awarded the project for Qinshan 300Mwe NPP full scope simulator upgrade, the SAT (site acceptance test) was completed on June 30 2005 and the simulator put into operator training again. Scope of upgrade includes: computer system (DGI server and workstations) all replaced by microcomputers; G2 I/O controllers all replaced by RTP EIOBC; Unix-based simulation support environment replaced by RINPO's PC-based simulation environment RINSIMTM, Instructor software replaced by RINPO's PC-based instructor software with function and diagram redesigned; DEH, Feed-water control and some other digital control systems redeveloped to follow NPP modifications; desk-top simulator with soft panel control room developed as byproduct; most of the models not changed but it is planned the reactor core and PPC model will be upgraded in near future. SAT of upgrade demonstrates that the performance of the simulator much improved after the upgrade. (author)

  11. Performing instrumentation and controls upgrades

    International Nuclear Information System (INIS)

    Kessler, F. M.; Connell, T. J.; Ryan, M. P.

    1992-01-01

    I and C upgrades are comprised of a varying range of content, complexity, expansiveness, and criticality. There are common threads in all upgrades which can be simplified by the development of a long term I and C upgrade plan. The development of a such a plan can establish effective ground rules for upgrades, large and small. It can be the basis from which to begin an upgrade evaluation and the standard which is used to compare the degree of compliance of any upgrade regarding the plan or to define the differences from the plan and an individual upgrade. Primary motivation for I and C upgrades are obsolescence and unavailability of spare parts. Numerous other areas of consideration are also involved in an upgrade. Today's technology results in most upgrades largely or totally utilizing digital equipment. The use of digital equipment is fairly new in many I and C applications and requires an elaborate evaluation from functional, qualification, operational, and licensing perspectives as well as others. A well defined upgrade plan developed as a basis for I and C upgrades is a significant start to ensuring an effective upgrade process. Properly developed and implemented, the plan will support I and C upgrade efforts to ensure that the intricacies associated with such tasks eliminate the existing problems which require the upgrade to be performed. The upgrade plan also results in ensuring the maximum benefit from all perspectives of the plant enhancements being carried out and considered for future implementation. Instrumentation and controls aging and replacement are issues of growing importance due to the potential for significant impact on plant operation and efficiency. Obsolescence and unavailability of spare parts are major drivers towards evaluating the cost benefits of upgrading current equipment. In addition to these two primary factors, the advantages of utilizing digital equipment have also become of prime importance when evaluating instrumentation and

  12. Hazard categorization of K Basin water filtration upgrade project

    International Nuclear Information System (INIS)

    Conn, K.R.

    1995-01-01

    This supporting document provides the hazards categorization for the K Basin Water Filtration Upgrade Project at K East. All activities associated with the project are less than Hazard Category 3, except for the handling of the ECO-ROK liners containing spent filter cartridges. All activities involving the handling of liners, containing spent cartridges, by monorail, forklift or mobile crane are classified as Hazard Category 3

  13. Design review report: AN valve pit upgrades for Project W-314, tank farm restoration and safe operations

    International Nuclear Information System (INIS)

    Boes, K.A.

    1998-01-01

    This Design Review Report (DRR) documents the contractor design verification methodology and records associated with project W-314's AN Valve Pit Upgrades design package. The DRR includes the documented comments and their respective dispositions for this design. Acceptance of the comment dispositions and closure of the review comments is indicated by the signatures of the participating reviewers. Project W-314, Tank Farm Restoration and Safe Operations, is a project within the Tank Waste Remediation System (TWRS) Tank Waste Retrieval Program. This project provides capital upgrades for the existing Hanford tank farms' waste transfer, instrumentation, ventilation, and electrical infrastructure systems. To support established TWRS programmatic objectives, the project is organized into two distinct phases. The initial focus of the project (i.e., Phase 1) is on waste transfer system upgrades needed to support the TWRS Privatization waste feed delivery system. Phase 2 of the project will provide upgrades to support resolution of regulatory compliance issues, improve tank infrastructure reliability, and reduce overall plant operating/maintenance costs. Within Phase 1 of the W-314 project, the waste transfer system upgrades are further broken down into six major packages which align with the project's work breakdown structure. Each of these six sub-elements includes the design, procurement, and construction activities necessary to accomplish the specific tank farm upgrades contained within the package. The first package to be performed is the AN Valve Pit Upgrades package. The scope of the modifications includes new pit cover blocks, valve manifolds, leak detectors, transfer line connections (for future planned transfer lines), and special protective coating for the 241-AN-A and 241-AN-B valve pits

  14. Upgrading Planning and Executive Strategy for Reactor Protection System and Relative Equipment in Qinshan Nuclear Power Plant

    International Nuclear Information System (INIS)

    Jiang Zuyue

    2010-01-01

    Qinshan Nuclear Power Plant (QNPP) is the first nuclear power plant in China which completed the reactor protection system (RPS) upgrading with new digital safety instrumentation and control (I and C) platform instead of original analog system. At the same time,the nuclear instrumentation system (NIS) was upgraded with the same digital I and C platform. For adapting QNPP's actual engineering situation,the upgrading planning was taken by comprehensively investigating current development and application of digital safety I and C platform in the worldwide scope and by reviewing plant's original systems operation history. The project executive strategy-QNPP's leading role with necessary overseas cooperation and internal technical supports as great as possible, was determined. Some significant factors might influence and restrict the RPS and relative equipment upgrading executive actions in an operating NPP were analyzed.Finally, the engineering feasibility was briefly assessed to recognize the anticipated issues and difficulties and to prepare the relative solutions in advance for the purpose of ensuring the RPS upgrading objectives completely realized. (authors)

  15. The Atlas upgrade project

    International Nuclear Information System (INIS)

    Bollinger, L.M.

    1988-01-01

    ATLAS is a heavy-ion accelerator system consisting of a 9-MV tandem electrostatic injector coupled to a superconducting linac. A project now well advanced will upgrade the capabilities of ATLAS immensely by replacing the tandem and its negative-ion source with a positive-ion injector that consists of an electron-cyclotron resonance (ECR) ion source and a 12-MV superconducting injector linac of novel design. This project will increase the beam intensity 100 fold and will extend the projectile-mass range up to uranium. Phase 1 of the work, which is nearing completion in late 1988, will provide an injector comprising the ECR source and its 350-kV voltage platform, beam analysis and bunching systems, beam lines, and a prototype 3-MV linac. The ECR source and its voltage platform are operational, development of the new class of low-frequency interdigital superconducting resonators required for the injector linac has been completed, and assembly of the whole system is in progress. Test runs and then routine use of the Phase 1 injector systems are planned for early 1989, and the final 12-MV injector linac will be commissioned in 1990. 12 refs., 6 figs

  16. Technology Transfer Programme In Reactor Digital Instrumentation And Control System (REDICS) Project: Knowledge, Experiences And Future Expectations

    International Nuclear Information System (INIS)

    Nurfarhana Ayuni Joha; Mohamad Puad Abu; Izhar Abu Hussin; Ridzuan Abdul Mutalib; Zareen Khan Abdul Jalil Khan; Mohd Khairulezwan Abdul Manan; Mohd Sabri Minhat; Mohd Idris Taib

    2013-01-01

    The PUSPATI TRIGA MARK II research reactor in Malaysia was commissioned in 1982. After 31 years of operation, Nuclear Malaysia is taking an approach for a better research and development in nuclear radiations as well as the technical services that provided. Reactor TRIGA PUSPATI (RTP) is currently upgrading its control console from analogue to digital system. The Reactor Digital Instrumentation and Control System (ReDICS) project is done on cooperation with Korea Atomic Energy Research Institute (KAERI), Korea including the technical part from the design stage until commissioning as well as the Technology Transfer Program (TTP). TTP in this ReDICS project is a part of Human Resource and System Development Program. It was carried out from the design stage until the commissioning of the system. It covers all subjects related to the design on the digital system and the requirements for the operation of RTP. The objective of this paper is to share the knowledge and experiences gained through this ReDICS project. This paper will also discuss the future expectations from this ReDICS project for Nuclear Malaysia and its personnel, as well as to the country. (author)

  17. Project AccessIT, Digitalization in Museums and Europeana (European Digital Library Project

    Directory of Open Access Journals (Sweden)

    Latif Özen

    2011-03-01

    Full Text Available This article emphasizes the importance of digitizing museum inventory records and establishing a data set in solving the problems of collection management in the museums of Turkey. Besides, the museum staff is encouraged to share the already existing digital content at the Europeana Digital Culture Portal by means of AccessIT project.

  18. Accessing Digital Libraries: A Study of ARL Members' Digital Projects

    Science.gov (United States)

    Kahl, Chad M.; Williams, Sarah C.

    2006-01-01

    To ensure efficient access to and integrated searching capabilities for their institution's new digital library projects, the authors studied Web sites of the Association of Research Libraries' (ARL) 111 academic, English-language libraries. Data were gathered on 1117 digital projects, noting library Web site and project access, metadata, and…

  19. Superhilac upgrade project

    International Nuclear Information System (INIS)

    Feinberg, B.; Brown, I.G.

    1985-05-01

    This project will increase the uranium output of the Bevalac heavy-ion facility from the currently available 10 7 to 5 x 10 7 ions/pulse, allowing accurate Lamb shift measurements to be made in U 90+ and U 91+ with important applications to the testing of quantum electrodynamics and the development of an x-ray laser. The injected beam intensity will be increased to make better use of the 10emA output space-charge limit of the Wideroe linac. Components will include a new high current MEtal Vapor Vacuum Arc (MEVVA) ion source along with an improved high current, high voltage Cockcroft-Walton power supply to handle the increased beam current. The Low Energy Beam Transport (LEBT) line will be upgraded with additional focusing to manage the increased space-charge forces and with an improved vacuum to reduce charge exchange losses. Finally, the phase matching between the 23MHz Wideroe linac and the 70MHz Alvarez linac will be improved by the addition of the appropriate buncher cavities. Physics design is underway and detailed engineering is scheduled to begin in October 1985, with installation slated for the 1986 summer shutdown

  20. The Abbey Theatre Digital Archive: a digitization project with dramatic impact

    Directory of Open Access Journals (Sweden)

    John Cox

    2017-11-01

    Full Text Available National University of Ireland Galway digitized the archive of the Abbey Theatre between 2012 and 2015. This was the largest theatre archive digitization project worldwide and it has had a major impact on the University and its Library. The scale of the digitization project presented a series of challenges, including fragile material, limited time, streamlined workflows, complex digital rights management and effective systems. The project was completed on time and on budget in 2015, using a ‘more product, less process’ approach. Access to the Abbey Theatre Digital Archive has delivered strong academic impact for the University, generating new research income and international connections as well as contributing to improved institutional ranking. The Digital Archive enables new types of research, including text and data mining, and has reshaped undergraduate curricula. It has also had a transformative effect on the Library as leader of the project. The role of the archivist has changed and partnerships with the academic community have strengthened. A growing emphasis on digital publication has been a catalyst for a function- rather than subject-based organizational structure which promotes participation in digital scholarship initiatives, with archives and special collections occupying a new position of prominence.

  1. Tank farm restoration and safe operation, Project W-314, upgrade scope summary report (USSR)

    International Nuclear Information System (INIS)

    Gilbert, J.L.

    1998-01-01

    The revision to the Project W-314 Upgrade Scope Summary Report (USSR), incorporates changes to the project scope from customer guidance. Included are incorporation of the recommendations from HNF-2500, agreements regarding interfaces with Project W-211, and assumption of scope previously assigned to Project W-454

  2. Control and data acquisition upgrades for NSTX-U

    Energy Technology Data Exchange (ETDEWEB)

    Davis, W.M., E-mail: bdavis@pppl.gov; Tchilinguirian, G.J., E-mail: gtchilin@pppl.gov; Carroll, T., E-mail: tcarroll@pppl.gov; Erickson, K.G., E-mail: kerickson@pppl.gov; Gerhardt, S.P., E-mail: sgerhardt@pppl.gov; Henderson, P., E-mail: phenderson@pppl.gov; Kampel, S.H., E-mail: skampel@pppl.gov; Sichta, P., E-mail: psichta@pppl.gov; Zimmer, G.N., E-mail: gzimmer@pppl.gov

    2016-11-15

    Highlights: • The NSTX-U upgrade is nearing completion, and various control and data acquisition upgrades are needed. • The Digital Coil Protection System is a major addition which provides hardware and software to protect the magnetic coils from the complex, increased, stresses added from the upgrade. • The increased computational requirements for the upgrade have largely followed Moore’s Law, and enhancements to the infrastructure and computer hardware should maintain or exceed the previous functionality. • Data requirements for Fast 2-D cameras have exceeded those of “conventional” time-varying signals. There has been a particular emphasis and increase in data from IR cameras. - Abstract: The extensive NSTX Upgrade (NSTX-U) Project includes major components which allow a doubling of the toroidal field strength to 1 T, of the Neutral Beam heating power to 12 MW, and the plasma current to 2 MA, and substantial structural enhancements to withstand the increased electromagnetic loads. The maximum pulse length will go from 1.5 to 5 s. The larger and more complex forces on the coils will be protected by a Digital Coil Protection System, which requires demanding real-time data input rates, calculations and responses. The amount of conventional digitized data for a given pulse is expected to increase from 2.5 to 5 GB per second of pulse. 2-D Fast Camera data is expected to go from 2.5 GB/pulse to 10, and another 2 GB/pulse is expected from new IR cameras. Our network capacity will be increased by a factor of 10, with 10 Gb/s fibers used for the major trunks. 32-core Linux systems will be used for several functions, including between-shot data processing, MDSplus data serving, between-shot EFIT analysis, real-time processing, and for a new capability, between-shot TRANSP. Improvements to the MDSplus events subsystem will be made through the use of both UDP and TCP/IP based methods and the addition of a dedicated “event server”.

  3. Computer-aided detection of breast carcinoma in standard mammographic projections with digital mammography

    Energy Technology Data Exchange (ETDEWEB)

    Destounis, Stamatia [Elizabeth Wende Breast Care, LLC, Rochester, NY (United States); University of Rochester, School of Medicine and Dentistry, Rochester, NY (United States); Hanson, Sarah; Morgan, Renee; Murphy, Philip; Somerville, Patricia; Seifert, Posy; Andolina, Valerie; Arieno, Andrea; Skolny, Melissa; Logan-Young, Wende [Elizabeth Wende Breast Care, LLC, Rochester, NY (United States)

    2009-06-15

    A retrospective evaluation of the ability of computer-aided detection (CAD) ability to identify breast carcinoma in standard mammographic projections. Forty-five biopsy proven lesions in 44 patients imaged digitally with CAD applied at examination were reviewed. Forty-four screening BIRADS {sup registered} category 1 digital mammography examinations were randomly identified to serve as a comparative normal/control population. Data included patient age; BIRADS {sup registered} breast density; lesion type, size, and visibility; number, type, and location of CAD marks per image; CAD ability to mark lesions; needle core and surgical pathologic correlation. The CAD lesion/case sensitivity of 87% (n=39), image sensitivity of 69% (n=31) for mediolateral oblique view and 78% (n=35) for the craniocaudal view was found. The average false positive rate in 44 normal screening cases was 2.0 (range 1-8). The 2.0 figure is based on 88 reported false positive CAD marks in 44 normal screening exams: 98% (n=44) lesions proceeded to excision; initial pathology upgraded at surgical excision from in situ to invasive disease in 24% (n=9) lesions. CAD demonstrated potential to detect mammographically visible cancers in standard projections for all lesion types. (orig.)

  4. Upgrading of the model to determine the economic and financial feasibility of a hotel

    OpenAIRE

    Neves, Beatriz

    2017-01-01

    This work project encompasses the upgrading of an already existing model to determine a hotel´s economic and financial feasibility, by adding some figures that give more information to the hotel managers and, therefore, can guide them in their strategic decisions. This upgrading was conducted to adapt the model to the changes that are going on in the hospitality industry such as, the growing importance of digital technology, that is changing the balance of power towards the consumer side and ...

  5. Digital control of the superconducting cavities for the LEP energy upgrade

    International Nuclear Information System (INIS)

    Gavallari, G.; Ciapala, E.

    1992-01-01

    The superconducting (SC) cavities for the LEP200 energy upgrade will be installed in units of 16 as for the present copper cavity system. Similar equipment will be used for RF power generation and distribution, for the low-level RF system and for digital control. The SC cavities and their associated equipment however require different interface hardware and new control software. To simplify routine operation control of the SC cavity units is made to resemble as closely as possible that of the existing units. Specific controls for the SC cavities at the equipment level, the facilities available and the integration of the SC cavity units into the LEP RF control system are described. (author)

  6. Research on real-time simulation test for upgrades of digital I and C system in nuclear power plant

    International Nuclear Information System (INIS)

    Shi Ji; Jiang Mingyu; Ma Yunqin

    2005-01-01

    The developing trend that digital instrument and control (I and C) system will supplant traditional analog I and C system in nuclear power plant is emphasized. This paper introduces mathematical model of steam generator of full scope simulator for nuclear power plant. The independent real-time simulation system, which forms the interactive closed loop together with the steam generator control system, can be applied to provide a simulation target for upgrades of instrument and control system and the research of control schemes. At the same time, a simulation method for this purpose is presented in this paper. In this method all of the hardware and software are composed of real distributed control system except the model of controlled object. This will not only create favorable conditions for commissioning on site in the future, but also give a theoretical analysis for upgrades of digital I and C system in nuclear power plant. (authors)

  7. Superconducting link bus design for the accelerator project for upgrade of LHC

    International Nuclear Information System (INIS)

    Nobrega, F.; Brandt, J.; Cheban, S.; Feher, S.; Kaducak, M.; Kashikhin, V.; Peterson, T.

    2011-01-01

    The Accelerator Project for Upgrade of LHC (APUL) is a U.S. project participating in and contributing to CERN's Large Hadron Collider (LHC) upgrade program. Fermi National Accelerator Laboratory in collaboration with Brookhaven National Laboratory was developing sub-systems for the upgrade of the LHC final focus magnet systems. Part of the upgrade called for various lengths of superconducting power transmission lines known as SC Links which were up to 100 m long. The SC Link electrically connects the current leads in the Distribution Feed Boxes to the interaction region magnets. The SC Link is an extension of the magnet bus housed within a cryostat. The present concept for the bus consists of 22 power cables, 4 x 13 kA, 2 x 7 kA, 8 x 2.5 kA and 8 x 0.6 kA bundled into one bus. Different cable and strand possibilities were considered for the bus design including Rutherford cable. The Rutherford cable bus design potentially would have required splices at each sharp elbow in the SC Link. The advantage of the round bus design is that splices are only required at each end of the bus during installation at CERN. The round bus is very flexible and is suitable for pulling through the cryostat. Development of the round bus prototype and of 2 splice designs is described in this paper. Magnetic analysis and mechanical test results of the 13 kA cable and splices are presented.

  8. LHC Injectors Upgrade (LIU) Project at CERN

    CERN Document Server

    Shaposhnikova, Elena; Damerau, Heiko; Funken, Anne; Gilardoni, Simone; Goddard, Brennan; Hanke, Klaus; Kobzeva, Lelyzaveta; Lombardi, Alessandra; Manglunki, Django; Mataguez, Simon; Meddahi, Malika; Mikulec, Bettina; Rumolo, Giovanni; Scrivens, Richard; Vretenar, Maurizio

    2016-01-01

    A massive improvement program of the LHC injector chain is presently being conducted under the LIU project. For the proton chain, this includes the replacement of Linac2 with Linac4 as well as all necessary upgrades to the Proton Synchrotron Booster (PSB), the Proton Synchrotron (PS) and Super Proton Synchrotron (SPS), aimed at producing beams with the challenging High Luminosity LHC (HL-LHC) parameters. Regarding the heavy ions, plans to improve the performance of Linac3 and the Low Energy Ion Ring (LEIR) are also pursued under the general LIU program. The full LHC injection chain returned to operation after Long Shutdown 1, with extended beam studies taking place in Run 2. A general project Cost and Schedule Review also took place in March 2015, and several dedicated LIU project reviews were held to address issues awaiting pending decisions. In view of these developments, 2014 and 2015 have been key years to define a number of important aspects of the final LIU path. This paper will describe the reviewed LI...

  9. Recent achievements of the ATLAS upgrade Planar Pixel Sensors R and D project

    International Nuclear Information System (INIS)

    Casse, G

    2014-01-01

    The ATLAS upgrade Planar Pixel Sensors (PPS) project aims to prove the suitability of silicon detectors processed with planar technology to equip all layers of the pixel vertex detector proposed for the upgrade of the ATLAS experiment for the future High Luminosity LHC at CERN (HL-LHC). The detectors need to be radiation tolerant to the extreme fluences expected to be received during the experimental lifetime, with optimised geometry for full coverage and high granularity and affordable in term of cost, due to the relatively large area of the upgraded ATLAS detector system. Here several solutions for the detector geometry and results with radiation hard technologies (n-in-n, n-in-p) are discussed

  10. Upgrade of the ATLAS Level-1 Calorimeter Trigger

    CERN Document Server

    Wessels, M; The ATLAS collaboration

    2014-01-01

    The Level-1 Calorimeter Trigger (L1Calo) of the ATLAS experiment has been operating well since the start of LHC data taking, and played a major role in the Higgs boson discovery. To face the new challenges posed by the upcoming increases of the LHC proton beam energy and luminosity, a series of upgrades is planned for L1Calo. The initial upgrade phase in 2013-14 includes substantial improvements to the analogue and digital signal processing to allow more sophisticated digital filters for energy and timing measurement, as well as compensate for pile-up and baseline shifting effects. Two existing digital algorithm processor subsystems will receive substantial hardware and firmware upgrades to increase the real-time data path bandwidth, allowing topological information to be transmitted and processed at Level-1. An entirely new subsystem, the Level-1 Topological Processor, will receive real-time data from both the upgraded L1Calo and Level-1 Muon Trigger to perform trigger algorithms based on entire event topolo...

  11. Full scope upgrade project for the Fermi 2 simulator

    International Nuclear Information System (INIS)

    Bollacasa, D.; Gonsalves, J.B.; Newcomb, P.C.

    1994-01-01

    The Detroit Edison company (DECO) concentrated the Simulation Division of Asea Brown Boveri (ABB) to perform a full scope upgrade of the Fermi 2 simulator. The Fermi 2 plant is a BWR 6 generation Nuclear Steam Supply System (NSSS). The project included the complete replacement of the existing simulation model sofware with ABB's high fidelity BWR models, addition of an advanced instructor station facility and new simulation computers. Also provided on the project were ABB's advanced simulation environment (CETRAN), a comprehensive configuration management system based on a modern relational database system and a new computer interface to the input/output system. (8 refs., 2 figs.)

  12. Reference moderator calculated performance for the LANSCE upgrade project

    International Nuclear Information System (INIS)

    Ferguson, P.D.; Russell, G.J.; Pitcher, E.J.

    1995-01-01

    The authors have calculated the performance of five moderators of interest to the LANSCE upgrade project. Coupled and decoupled light water and liquid hydrogen moderators in flux-trap geometry surrounded by a neutronically infinite heavy-water cooled beryllium reflector have been studied. Time and energy spectra, as well as semi-empirical fits to the data, are presented. The data has been made available to aid the instrument design and moderator selection process

  13. The digital Emily project: achieving a photorealistic digital actor.

    Science.gov (United States)

    Alexander, Oleg; Rogers, Mike; Lambeth, William; Chiang, Jen-Yuan; Ma, Wan-Chun; Wang, Chuan-Chang; Debevec, Paul

    2010-01-01

    The Digital Emily Project uses advanced face scanning, character rigging, performance capture, and compositing to achieve one of the world's first photorealistic digital facial performances. The project scanned the geometry and reflectance of actress Emily O'Brien's face in 33 poses, showing different emotions, gaze directions, and lip formations in a light stage. These high-resolution scans-accurate to skin pores and fine wrinkles-became the basis for building a blendshape-based facial-animation rig whose expressions closely matched the scans. The blendshape rig drove displacement maps to add dynamic surface detail. A video-based facial animation system animated the face according to the performance in a reference video, and the digital face was tracked onto the video's motion and rendered under the same illumination. The result was a realistic 3D digital facial performance credited as one of the first to cross the "uncanny valley" between animated and fully human performances.

  14. Upgrading the ATLAS Tile Calorimeter electronics

    CERN Document Server

    Oreglia, M; The ATLAS collaboration

    2013-01-01

    The Tile Calorimeter (TileCal) is the hadronic calorimeter covering the most central region of the ATLAS experiment at LHC. The TileCal readout consists of about 10000 channels. The main upgrade will occur for the High Luminosity LHC phase (phase 2) which is scheduled around 2022. The upgrade aims at replacing the majority of the on- and off- detector electronics so that all calorimeter signals are directly digitized and sent to the off-detector electronics in the counting room. An ambitious upgrade development program is pursued studying different electronics options. Three different options are presently being investigated for the front-end electronic upgrade. Which one to use will be decided after extensive test beam studies. High speed optical links are used to read out all digitized data to the counting room. For the off-detector electronics a new back-end architecture is being developed, including the initial trigger processing and pipeline memories. A demonstrator prototype read-out for a slice of the ...

  15. Acceptance test report for project C-157 ''T-Plant electrical upgrade''

    International Nuclear Information System (INIS)

    Jeppson, L.A.

    1997-01-01

    This Acceptance Test Report (ATR) documents for record purposes the field results, acceptance, and approvals of the completed acceptance test per WHC-SD-Cl57-ATP-001, Rev. 0, ''Acceptance Test Proceedure for Project C-157 'T Plant Electrical Upgrade''' The test was completed and approved without any problems or exceptions

  16. Acceptance test report for project C-157 ``T-Plant electrical upgrade``

    Energy Technology Data Exchange (ETDEWEB)

    Jeppson, L.A.

    1997-08-05

    This Acceptance Test Report (ATR) documents for record purposes the field results, acceptance, and approvals of the completed acceptance test per WHC-SD-Cl57-ATP-001, Rev. 0, ``Acceptance Test Proceedure for Project C-157 `T Plant Electrical Upgrade``` The test was completed and approved without any problems or exceptions.

  17. Digitalizing upgrade of the power supplies for the extraction septum magnets in HIRFL-CSR

    International Nuclear Information System (INIS)

    Zhao Jiang; Zhang Huajian; Wu Fengjun; Yuan Zhendong; Chen Youxin; Huang Yuzhen; Gao Daqing

    2014-01-01

    This paper introduces the working principle of the power supplies for the septum magnets in HIRFL-CSR and presents a feasible scheme of digitalizing these power supplies. The scheme employed the SOPC (system-on-a-programmable-chip) technology based on FPGA, the software framework of NIOSII and the polycyclic adjustment algorithm realized by the hardware description language. Then, several key problems that could be encountered in realizing the power supply control algorithm on FPGA were discussed. After the power supplies were upgraded, the beam of HIRFL-CSR was extracted more reliably and the stability of beam spot position at the experimental terminals has been obviously improved. This work would provide a valuable reference for the engineers of digitalizing other magnetic power supplies in HIRFL-CSR and of developing magnetic power supplies for heavy ion cancer therapy. (authors)

  18. Needs analysis and project schedule for the Los Alamos National Laboratory (LANL) Health Physics Analysis Laboratory (HPAL) upgrade

    International Nuclear Information System (INIS)

    Rhea, T.A.; Rucker, T.L.; Stafford, M.W.

    1990-01-01

    This report is a needs assessment and project schedule for the Health Physics Analysis Laboratory (HPAL) upgrade project at Los Alamos National Laboratory (LANL). After reviewing current and projected HPAL operations, two custom-developed laboratory information management systems (LIMS) for similar facilities were reviewed; four commercially available LIMS products were also evaluated. This project is motivated by new regulations for radiation protection and training and by increased emphasis on quality assurance (QA). HPAL data are used to: protect the health of radiation workers; document contamination levels for transportation of radioactive materials and for release of materials to the public for uncontrolled use; and verify compliance with environmental emission regulations. Phase 1 of the HPAL upgrade project concentrates on four types of counting instruments which support in excess of 90% of the sample workload at the existing central laboratories. Phase 2 is a refinement phase and also integrates summary-level databases on the central Health, Safety, and Environment (HSE) VAX. Phase 3 incorporates additional instrument types and integrates satellite laboratories into the HPAL LIMS. Phase 1 will be a multi-year, multimillion dollar project. The temptation to approach the upgrade of the HPAL program in a piece meal fashion should be avoided. This is a major project, with clearly-defined goals and priorities, and should be approached as such. Major programmatic and operational impacts will be felt throughout HSE as a result of this upgrade, so effective coordination with key customer contacts will be critical

  19. Software and man-machine interface considerations for a nuclear plant computer replacement and upgrade project

    International Nuclear Information System (INIS)

    Diamond, G.; Robinson, E.

    1984-01-01

    Some of the key software functions and Man-Machine Interface considerations in a computer replacement and upgrade project for a nuclear power plant are described. The project involves the installation of two separate computer systems: an Emergency Response Facilities Computer System (ERFCS) and a Plant Process Computer System (PPCS). These systems employ state-of-the-art computer hardware and software. The ERFCS is a new system intended to provide enhanced functions to meet NRC post-TMI guidelines. The PPCS is intended to replace and upgrade an existing obsolete plant computer system. A general overview of the hardware and software aspects of the replacement and upgrade is presented. The work done to develop the upgraded Man-Machine Interface is described. For the ERFCS, a detailed discussion is presented of the work done to develop logic to evaluate the readiness and performance of safety systems and their supporting functions. The Man-Machine Interface considerations of reporting readiness and performance to the operator are discussed. Finally, the considerations involved in the implementation of this logic in real-time software are discussed.. For the PPCS, a detailed discussion is presented of some new features

  20. Development and application of all-digital monitoring system

    International Nuclear Information System (INIS)

    Xu Tao; Li Jing; Wang Wei

    2014-01-01

    All digital control system has developed into a mainstream means of monitoring, and achieved information, intelligence, and networking. All-digital control system is characterized by clear image, large transport stream, so the higher the data storage and network bandwidth should be required. Existing analog surveillance system architecture, hardware and software configuration can not meet the requirements of all-digital monitoring system, so how to solve the original analog surveillance system is gradually transformed into fully digital monitoring system, to avoid incompatibility issues in surveillance monitoring system upgrade become a research project. This paper describes the advantages and future direction of megapixels camera and proposes key technologies to solve the resolution and frame rate with the actual project requirements, achieves a core technology of megapixels video surveillance system, and proposes solutions for the actual renovation project problems. (authors)

  1. UPGRADES

    CERN Multimedia

    J. Butler and J. Nash

    2011-01-01

    Recent progress on the CMS upgrades was summarised, in a workshop held at Fermilab between 7th and 10th November, attended by more than 150 people, many of whom came from Europe and Asia. Important goals of the workshop were to begin to formulate a schedule for the upgrades and to determine project interdependencies. Input was received from all the upgrade working groups and will be combined into a first-pass schedule over the next several weeks. In addition, technical progress on each of the major subtasks was presented and plans for the near-term future were established. Slides from the more than 100 talks are located at: https://indico.cern.ch/conferenceDisplay.py?confId=153564 In the opening plenary session, Frank Zimmermann, of the CERN Beams Department, gave his view of the LHC luminosity evolution. The luminosity will increase faster than we assumed in designing the upgrades. CMS will need to re-evaluate the current upgrade plans and revise them if necessary. CMS Upgrade Physics coordinator...

  2. The Development of Digital Collections and Resources Organization Related Projects in Taiwan

    Directory of Open Access Journals (Sweden)

    Hsueh-Hua Chen

    2001-12-01

    Full Text Available With the development of Internet, digital libraries/museums have received worldwide attention and many developed countries are doing extensive researches on digital libraries/museums. In Taiwan, many institutions have digitized their rare collections. This paper introduces the recent development of digital projects in Taiwan, including: Digital Museum Project, National Digital Collection Project and National Culture Database Project, and also especially introduces some resources organization related projects. [Article content in Chinese

  3. The life cycle management of the analogical I and C in NPP modernization project

    International Nuclear Information System (INIS)

    Wang Hongtao

    2014-01-01

    The existing NPPS (nuclear power plants) are subject for the ageing and obsolete problems of the analogue I and C systems. The large scope I and C upgrade project based on the DCS technology has the following challenged characteristics: the complicated technology, the broad impacts, the big investment and the long implementation period. This document gives a preliminary introduction and analysis from the aspects including the motives for the upgrade, I and C design base, the digital technology characteristics, I and C function analysis, I and C safety classification, I and C architecture, life-cycle-management mission for the related stages. Considering the experiences and lessons learned from the similar I and C upgrade projects in foreign NPPS, the conclusion and recommendation is given for I and C modernization based on the digital technology. (author)

  4. Upgrading the Reactor Power Control Concept with a Modern Digital Control System

    International Nuclear Information System (INIS)

    Laengle, M.; Schildheuer, R.

    2011-01-01

    Within the framework of a retrofit project, a reactor power instrumentation and control system (REALL) - consisting of a limiting system and the respective reactor control systems - was retrofitted and modernized in a 1450-MW-nuclear-power-plant in Baden-Wuerttemberg. The REALL process control functions were implemented within a modern and completely digitized control system that has been designed for use in safety I and C applications. Along with the installation of the digital control system, the associated hardware was adapted to today's state of the art. At the same time, the given potential for improvement, as revealed during the plant's operation so far, was taken into account in the programming. In order to provide for transparent and quality-assured project management, the implementation was based on a stage plan consisting of several steps, along with specific milestones. Final commissioning of the modern digital control system took place during the 2008 plant overhaul. Despite the complex commissioning procedure, it was possible to avoid a major prolongation of the plant's downtime and to keep within a rough 4-week timeframe that had originally been defined for the plant overhaul to adequate structuring of the project, goal-oriented implementation of preparatory infrastructural measures and adequate scheduling of the coordinated activities of the installation and commissioning teams entrusted with the commissioning of the digital control system during the overhaul activities. (author)

  5. Work plan for upgrade of SY-101 Hydrogen Mitigation Test Project Data Acquisition and Control Systemm (DACS-1)

    International Nuclear Information System (INIS)

    Truitt, R.W.

    1994-08-01

    The purpose of this effort is to upgrade the existing DACS-1 used for control and data acquisition in support of the hydrogen mitigation program for tank 101-SY. The planned upgrades will enhance the system capabilities to support additional mitigation projects and improve the system operability by implementing changes identified during operation of the system to date. Once the upgrades have been implemented, the DACS-1 system should operate as it did prior to the upgrade, but with greatly increased speed and capability. No retraining of Test Engineers will be required; the upgrade is designed to be transparent to those who operate it, with only a noticeable increase in the speed of the system. This work plan defines the tasks required for implementing the upgrade. It identifies deliverables, responsible organizations and individuals, interfaces, and schedule. This upgrade effort employs system engineering principles wherever applicable

  6. New Upgrade Project for the Photon Factory Storage Ring

    International Nuclear Information System (INIS)

    Asaoka, S.; Haga, K.; Harada, K.; Honda, T.; Hori, Y.; Izawa, M.; Kasuga, T.; Kobayashi, M.; Kobayashi, Y.; Maezawa, H.; Minagawa, Y.; Mishina, A.; Mitsuhashi, T.; Miyajima, T.; Miyauchi, H.; Nagahashi, S.; Nogami, T.; Obina, T.; Pak, C. O.; Sakanaka, S.

    2004-01-01

    A new project for upgrading the 2.5-GeV Photon Factory (PF) storage ring is now being undertaken to create six new short-straight sections and to lengthen the existing eight straight sections. The short-straight sections will provide an opportunity to install short-period narrow-gap undulators, while the extensions of existing straight sections will be taken advantage of updating current insertion devices to the latest models in future. To this end, the lattice configuration around the straight sections is modified by replacing old quadrupole magnets with new shorter ones and placing them closer to the near-by bending magnets. Necessary replacement of the vacuum ducts and the beamline front ends will be carried out together. This project will be completed by the end of September, 2005, after six months of shutdown

  7. Performance Studies of Micromegas Chambers for the New Small Wheel Upgrade Project

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00349891; The ATLAS collaboration; Leontsinis, Stefanos

    2015-01-01

    Micromegas, an abbreviation for Micro MEsh Gaseous Structure (MM), is a robust detector with excellent spatial resolution and high rate capability. An $R\\&D$ activity, called Muon ATLAS MicroMegas Activity (MAMMA), was initiated in 2007 in order to explore the potential of the MM technology for use in the ATLAS experiment. After several years of prototyping and testing, the ATLAS collaboration has chosen the MM technology along with the small-strip Thin Gap Chambers (sTGC) for the upgrade of the inner muon station in the high-rapidity region, the so called New Small Wheel (NSW) upgrade project. It will employ eight layers of MM and eight layers of sTGC detectors per wheel. The NSW project requires fully efficient MM chambers, able to cope with the maximum expected rate of $15\\,\\mathrm{kHz/cm^2}$ featuring single plane spatial resolution better than $100\\,\\mu\\mathrm{m}$. The MM detectors will cover a total active area of $\\sim1200\\,\\mathrm{m^2}$ and will be operated in a moderate magnetic field with intens...

  8. The Los Alamos National Laboratory Chemistry and Metallurgy Research Facility upgrades project - A model for waste minimization

    International Nuclear Information System (INIS)

    Burns, M.L.; Durrer, R.E.; Kennicott, M.A.

    1996-07-01

    The Los Alamos National Laboratory (LANL) Chemistry and Metallurgy Research (CMR) Facility, constructed in 1952, is currently undergoing a major, multi-year construction project. Many of the operations required under this project (i.e., design, demolition, decontamination, construction, and waste management) mimic the processes required of a large scale decontamination and decommissioning (D ampersand D) job and are identical to the requirements of any of several upgrades projects anticipated for LANL and other Department of Energy (DOE) sites. For these reasons the CMR Upgrades Project is seen as an ideal model facility - to test the application, and measure the success of - waste minimization techniques which could be brought to bear on any of the similar projects. The purpose of this paper will be to discuss the past, present, and anticipated waste minimization applications at the facility and will focus on the development and execution of the project's open-quotes Waste Minimization/Pollution Prevention Strategic Plan.close quotes

  9. Upgrading the ATLAS control system

    International Nuclear Information System (INIS)

    Munson, F.H.; Ferraretto, M.

    1993-01-01

    Heavy-ion accelerators are tools used in the research of nuclear and atomic physics. The ATLAS facility at the Argonne National Laboratory is one such tool. The ATLAS control system serves as the primary operator interface to the accelerator. A project to upgrade the control system is presently in progress. Since this is an upgrade project and not a new installation, it was imperative that the development work proceed without interference to normal operations. An additional criteria for the development work was that the writing of additional ''in-house'' software should be kept to a minimum. This paper briefly describes the control system being upgraded, and explains some of the reasons for the decision to upgrade the control system. Design considerations and goals for the new system are described, and the present status of the upgrade is discussed

  10. Concept and Development Status of the Digital Upgrade of the Mini Multi-Channel Analyser (DMCA)

    International Nuclear Information System (INIS)

    Brutscher, J.; Birnbaum, A.; Keubler, J.; Jung, S.; Koestlbauer, M.; Richter, B.; Schwalbach, P.; Zweidorf, A. von

    2010-01-01

    The Mini Multi Channel Analyser (MMCA) is a portable electronics module used for neutron and gamma ray Non-Destructive Assay (NDA) of nuclear material. The MMCA is widely used in nuclear safeguards to perform certain classes of verification activities on nuclear material. For more than a decade, an important but non-exclusive area of application has been low- and medium-resolution gamma spectroscopy and attribute testing. To make use of advances in digital technology, communication protocols and standardisation, display technology, and user interaction paradigms, while preserving the main functionality and compatibility with the existing MMCA, a digital upgrade of the MMCA (DMCA) is being developed in the frame of the German Support Programme to the International Atomic Energy Agency (IAEA) with cooperation of the European Commission. The DMCA is dubbed MCA-527. At the same time, a data acquisition and analysis software interface optimized for in-field use is being developed (''MCAtouch''). In this paper, development status and performance parameters of the digital MCA-527 as well as the software interface MCAtouch are discussed in the context of safeguards requirements for typical in-field applications. (author)

  11. EBR-II fuel handling console digital upgrade

    International Nuclear Information System (INIS)

    Peters, G.G.; Wiege, D.D.; Christensen, L.J.

    1995-01-01

    The main fuel handling console and control system at the Experimental Breeder Reactor II (EBR-II) are being upgraded to a computerized system using high-end workstations for the operator interface and a programmable logic controller (PLC) for the control system. Two-dimensional (2D) and three-dimensional (3D) computer graphics will be provided for the operator which will show the relative position of under-sodium fuel handling equipment. This equipment is operated remotely with no means of directly viewing the transfer. This paper describes various aspects of the modification including reasons for the upgrade, capabilities the new system provides over the old control system, philosophies and rationale behind the new design, testing and simulation work, diagnostic features, and the advanced graphics techniques used to display information to the operator

  12. Prioritizing and scheduling Portsmouth Gaseous Diffusion Plant safeguards upgrades

    International Nuclear Information System (INIS)

    Edmunds, T.; Saleh, R.; Zevanove, S.

    1992-02-01

    As part of the Site Safeguards and Security Plan (SSSP), facilities are required to develop a Resource Plan (RP). The Resource Plan provides documentation and justification for the facility's planned upgrades, including the schedule, priority, and cost estimates for the safeguards and security upgrades. Portsmouth Gaseous Diffusion Plant (PORTS) management has identified and obtained funding approval for a number of safeguards and security upgrades, including line-item construction projects. These upgrade projects were selected to address a variety of concerns identified in the PORTS vulnerability assessments and other reviews performed in support of the SSSP process. However, budgeting and scheduling constraints do not make it possible to simultaneously begin implementation of all of the upgrade projects. A formal methodology and analysis are needed to explicitly address the trade-offs between competing safeguards objectives, and to prioritize and schedule the upgrade projects to ensure that the maximum benefit can be realized in the shortest possible time frame. The purpose of this report is to describe the methodology developed to support these upgrade project scheduling decisions. The report also presents the results obtained from applying the methodology to a set of the upgrade projects selected by PORTS S ampersand S management. Data for the analysis are based on discussions with personnel familiar with the PORTS safeguards and security needs, the requirements for implementing these upgrades, and upgrade funding limitations. The analysis results presented here assume continued highly enriched uranium (HEU) operations at PORTS. However, the methodology developed is readily adaptable for the evaluation of other operational scenarios and other resource allocation issues relevant to PORTS

  13. Performance Studies of Micromegas Chambers for the New Small Wheel Upgrade Project

    Directory of Open Access Journals (Sweden)

    Leontsinis S.

    2016-01-01

    Full Text Available The ATLAS collaboration has chosen the Micromegas technology along with the small-strip Thin Gap Chambers for the upgrade of the inner muon station in the high-rapidity region, the so called New Small Wheel upgrade project. It will employ eight layers of Micromegas and eight layers of small-strip Thin Gap Chambers per wheel. The New Small Wheel project requires fully efficient Micromegas chambers, able to cope with the maximum expected rate of 15 kHz/cm2 featuring single plane spatial resolution better than 100 μm. The Micromegas detectors will cover a total active area of ~ 1200 m2 and will be operated in a moderate magnetic field (≤ 0.3 T. Moreover, together with their precise tracking capability the New Small Wheel Micromegas chambers will contribute to the ATLAS Level-1 trigger system. Several studies have been performed on small (10 × 10 cm2 and medium (1 × 0.5 m2 size prototypes using medium (1 − 5 GeV/c and high momentum (120 – 150 GeV/c hadron beams at CERN. A brief overview of the results obtained is presented.

  14. Implementing digital instrumentation and control systems in the modernization of nuclear power plants

    International Nuclear Information System (INIS)

    2009-01-01

    The IAEA encourages greater use of good engineering and management practices by Member States. In particular, it supports activities such as nuclear power plant (NPP) performance improvement, plant life management, training, power uprating, operational license renewal and the modernization of instrumentation and control (I and C) systems of NPPs in Member States. The subject of implementing digital I and C systems in nuclear power plants was suggested by the Technical Working Group on Nuclear Power Plant Control and Instrumentation (TWG-NPPCI) in 2003. It was then approved by the IAEA and included in the programmes for 2006-2008. As the current worldwide fleet of nuclear power plants continues ageing, the need for improvements to maintain or enhance plant safety and reliability is increasing. Upgrading NPP I and C systems is one of the possible approaches to achieving this improvement, and in many cases upgrades are a necessary activity for obsolescence management. I and C upgrades at operating plants require the use of digital I and C equipment. While modernizing I and C systems is a significant undertaking, it is an effective means to enhance plant safety and system functionality, manage obsolescence, and mitigate the increasing failure liability of ageing analog systems. Many of the planning and implementation tasks of a digital I and C upgrade project described here are also relevant to new plant design and construction since all equipment in new plants will be digital. This publication explains a process for planning and conducting an I and C modernization project. Numerous issues and areas requiring special consideration are identified, and recommendations on how to integrate the licensing authority into the process are made. To complement this report, a second publication is planned which will illustrate many of the aspects described here through experience based descriptions of I and C projects and lessons learned from those activities. It is upon these

  15. Orthogonally Based Digital Content Management Applicable to Projects-bases

    Directory of Open Access Journals (Sweden)

    Daniel MILODIN

    2009-01-01

    Full Text Available There is defined the concept of digital content. The requirements of an efficient management of the digital content are established. There are listed the quality characteristics of digital content. Orthogonality indicators of digital content are built up. They are meant to measure the image, the sound as well as the text orthogonality as well. Projects-base concept is introduced. There is presented the model of structuring the content in order to maximize orthogonality via a convergent iterative process. The model is instantiated for the digital content of a projects-base. It is introduced the application used to test the model. The paper ends with conclusions.

  16. UPGRADES

    CERN Document Server

    D. Contardo and J. Spalding

    2013-01-01

    There is very good progress in the execution of the LS1 projects and in launching construction of the Phase 1 upgrades. We focus here on two main achievements since the last CMS Week. The approval of the third Phase 1 TDR The preparation of the L1 Trigger Upgrade Technical Design Report has been a major effort of the collaboration at the beginning of this year, especially to develop supporting Trigger menu and physics performance studies. These studies have demonstrated the efficiency of the upgraded system to ensure low lepton and jet trigger thresholds, leading to a significant increase of the acceptance for the Higgs measurements, in the associated production mode and in the ττ decays, as well as for the stop searches involving multiple jets in the final state. The TDR was submitted to the LHCC in May and approved at the June committee meeting. It is now a public document, completing the series of the three TDRs describing the Phase 1 upgrades, with the new Pixel system and the HCAL rea...

  17. Digitization Projects Carried out by the Mathematical Institute Belgrade

    OpenAIRE

    Ognjanovič, Zoran; Mijajlovič, Žarco

    2004-01-01

    In this paper some current digitization projects carried out by the Mathematical Institute of Serbian Academy of Science and Arts Belgrade and the Faculty of Mathematics Belgrade are described. The projects concern developing of a virtual library of retro-digitized books and an Internet data base and presentation of electronic editions of some leading Serbian journals in science and arts, and the work on the South-Eastern European Digitization Initiative (SEEDI).

  18. 75 FR 32940 - Request for Proposals for New or Upgraded Transmission Line Projects Under Section 1222 of the...

    Science.gov (United States)

    2010-06-10

    ... financial condition and has the ability to secure the necessary financing to meet the Project's requirements... for Proposals for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy..., Department of Energy. ACTION: Request for Project Proposals. SUMMARY: The Department of Energy (DOE or...

  19. Upgrade of the ATLAS Tile Calorimeter

    CERN Document Server

    Reed, Robert; The ATLAS collaboration

    2014-01-01

    The Tile Calorimeter (TileCal) is the main hadronic calorimeter covering the central region of the ATLAS experiment at LHC. TileCal readout consists of about 10000 channels. The bulk of its upgrade will occur for the High Luminosity LHC operation (Phase 2 around 2023) where the peak luminosity will increase 5x compared to the design luminosity (10^{34} cm^{-2}s^{-1}) but with maintained energy (i.e. 7+7 TeV). The TileCal upgrade aims to replace the majority of the on- and off-detector electronics so that all calorimeter signals can be digitized and directly sent to the off-detector electronics in the counting room. This will reduce pile-up problems and allow more complex trigger algorithms. To achieve the required reliability, redundancy has been introduced at different levels. Three different options are presently being investigated for the front-end electronic upgrade. Extensive test beam studies will determine which option will be selected. 10 Gbps optical links are used to read out all digitized data to t...

  20. Upgrade of the ATLAS Tile Calorimeter

    CERN Document Server

    Moreno, P; The ATLAS collaboration

    2016-01-01

    The Tile Calorimeter (TileCal) is the central hadronic calorimeter covering the central region of the ATLAS experiment at LHC. The TileCal readout consists of about 10000 channels. The bulk of its upgrade will occur for the High Luminosity LHC phase (Phase 2) where the peak luminosity will increase 5$\\times$ compared to the design luminosity ($10^{34} cm^{-2}s^{-1}$) but with maintained energy (i.e. 7+7 TeV). The TileCal upgrade aims at replacing the majority of the on- and off-detector electronics to the extent that all calorimeter signals will be digitized and sent to the off-detector electronics in the counting room. To achieve the required reliability, redundancy has been introduced at different levels. Three different options are presently being investigated for the front-end electronic upgrade. Extensive test beam studies will determine which option will be selected. 10 Gbps optical links are used to read out all digitized data to the counting room while 5 Gbps down-links are used for synchronization, c...

  1. Students Upgrading through Computer and Career Education System Services (Project SUCCESS). Final Evaluation Report 1993-94. OER Report.

    Science.gov (United States)

    Greene, Judy

    Students Upgrading through Computer and Career Education System Services (Project SUCCESS) was an Elementary and Secondary Education Act Title VII-funded project in its fourth year of operation. The project operated at two high schools in Brooklyn and one in Manhattan (New York). In the 1993-94 school year, the project served 393 students of…

  2. UPGRADES

    CERN Multimedia

    Didier Contardo

    2012-01-01

      The CMS Upgrade Programme is making good progress on the LS1 and Phase 1 projects, in the planning for Phase 2. The construction of the ME4/2 muon chambers to be installed during LS1 has started and the two first CSC production chambers have been fully qualified. The three muon groups have recently established a set of milestones towards the completion of their project, that will be integrated in the detailed planning and scheduling for the shutdown work established by Technical Coordination. The project to replace the photo-detectors in the HF and HO calorimeters is also well advanced and at the validation stage. The operation of an HF slice with new multi-anode PMTs and back-end electronics has already been demonstrated in 2012. For the Phase 1 data-taking, as discussed in the Chamonix workshop, it is likely that the LHC performance will exceed the nominal luminosity and pile-up before the second shutdown, still scheduled in 2018. The collaboration is therefore pursuing a strategy to upgrade ...

  3. Slum upgrading in developing countries: lessons from Ghana and ...

    African Journals Online (AJOL)

    The paper identifies common elements in the upgrading programmes in the literature. It assesses two slum upgrading projects from Ghana and Kenya to determine how the elements were factored into the projects' implementation. The article concludes that stakeholders involved in slum upgrading in Africa should consider ...

  4. FTU bolometer electronic system upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Pollastrone, Fabio, E-mail: fabio.pollastrone@enea.it [Associazione EURATOM-ENEA sulla Fusione, Via Enrico Fermi 45, 00044 Frascati, Rome (Italy); Neri, Carlo; Florean, Marco; Ciccone, Giovanni [Associazione EURATOM-ENEA sulla Fusione, Via Enrico Fermi 45, 00044 Frascati, Rome (Italy)

    2013-10-15

    Highlights: ► Design and realization of a new bolometer electronic system. ► Many improvements over the actual commercial system. ► Architecture based on digital electronic hardware with minimal analog front end. ► Auto off-set correction, real time visualization features and small system size. ► Test results for the electronic system. -- Abstract: The FTU (Frascati Tokamak Upgrade) requires a bolometer diagnostic in order to measure the total plasma radiation. The current diagnostic architecture is based on a full analog multichannel AC bolometer system, which uses a carrier frequency amplifier with a synchronous demodulation. Taking into account the technological upgrades in the field of electronics, it was decided to realize an upgrade for the bolometric electronic system by using a hybrid analog/digital implementation. The new system developed at the ENEA Frascati laboratories has many improvements, and mainly a massive system volume reduction, a good measurement linearity and a simplified use. The new hardware system consists of two subsystems: the Bolometer Digital Control and the Bolometer Analog System. The Bolometer Digital Control can control 16 bolometer bridges through the Bolometer Analog System. The Bolometer Digital Control, based on the FPGA architecture, is connected via Ethernet with a PC; therefore, it can receive commands settings from the PC and send the stream of bolometric measurements in real time to the PC. In order to solve the cross-talk between the bridges and the cables, each of the four bridges in the bolometer head receives a different synthesized excitation frequency. Since the system is fully controlled by a PC GUI (Graphic User Interface), it is very user friendly. Moreover, some useful features have been developed, such as: auto off-set correction, bridge amplitude regulation, software gain setting, real time visualization, frequency excitation selection and noise spectrum analyzer embedded function. In this paper, the

  5. Upgrading the ATLAS Tile Calorimeter electronics

    CERN Document Server

    Carrio, F; The ATLAS collaboration

    2013-01-01

    The Tile Calorimeter (TileCal) is the hadronic calorimeter covering the most central region of the ATLAS experiment at LHC. The TileCal readout consists of about 10000 channels. Its main upgrade will occur for the High Luminosity LHC phase (phase 2) where the luminosity will have increased 5-fold compared to the design luminosity (1034 cm−2s−1) but with maintained energy (i.e. 7+7 TeV). An additional luminosity increase by a factor of 2 can be achieved by luminosity leveling. This upgrade will probably happen around 2022. The upgrade aims at replacing the majority of the on- and off- detector electronics so that all calorimeter signals are directly digitized and sent to the off-detector electronics in the counting room. To achieve the required reliability, redundancy has been introduced at different levels. An ambitious upgrade development program is pursued studying different electronics options. Three different options are presently being investigated for the front-end electronic upgrade. Which one to u...

  6. MILLION BOOK UNIVERSAL DIGITAL LIBRARY PROJECTS: INDIA

    OpenAIRE

    Waghmode, S. S.

    2009-01-01

    Digital Library of India is a digital library of books, which is free-to-read, searchable, predominantly in India languages, available to everyone over the Internet. Very soon it is expected that this portal would provide a gateway to Indian Digital Libraries in Science, Arts, Culture, Music, Movies, Traditional Medicine, Palm Leaves and many more. This project is collaboration between Indian Institute of Science, Bangalore, Universities and Carnegie Mellon University under MILLION BOOK UNIVE...

  7. Students Upgrading through Computer and Career Education System Services (Project SUCCESS). Final Evaluation Report 1992-93. OER Report.

    Science.gov (United States)

    New York City Board of Education, Brooklyn, NY. Office of Educational Research.

    Student Upgrading through Computer and Career Education System Services (Project SUCCESS) was an Elementary and Secondary Education Act Title VII-funded project in its third year of operation. Project SUCCESS served 460 students of limited English proficiency at two high schools in Brooklyn and one high school in Manhattan (New York City).…

  8. Bi-Provincial Upgrader

    International Nuclear Information System (INIS)

    1997-01-01

    Husky Oil's Bi-Provincial Upgrader is located in the rural municipality of Wilton, east of Lloydminster, Saskatchewan. It is jointly owned by Husky Oil and the Saskatchewan government. The upgrader is designed to produce 7.300 m 3 /cd of synthetic crude from 8.440 m 3 /cd of diluted Lloyd blend and distillates from the existing Lloydminster refinery. The designed coke and sulphur production is 415 t/day and 240 t/day respectively. Chronology of the Bi-Provincial Upgrader project was presented, along with details of the heavy oil feedstock properties for Cold Lake, Lloydminster and Lloyd Blend. Upgrader production history since start-up, synthetic crude oil customers, and the evolution of prices for Edmonton light vs. Husky LLB at Hardisty were also reviewed. 3 tabs., 9 figs

  9. Digital projection radiography. Technical principles, image properties and potential applications

    International Nuclear Information System (INIS)

    Busch, H.P.

    1999-01-01

    The history of development of digital projection radiography as a diagnostic method is presented in a comprehensive survey. The various technical principles are explained in detail and illustrated by means of graphic figures and digital X-ray pictures. A comparative assessment of currently applied radiographic systems is given and the potential clinical applications of the method of digital projection radiography are discussed. (orig./CB) [de

  10. The Digital Humanities as a Humanities Project

    Science.gov (United States)

    Svensson, Patrik

    2012-01-01

    This article argues that the digital humanities can be seen as a humanities project in a time of significant change in the academy. The background is a number of scholarly, educational and technical challenges, the multiple epistemic traditions linked to the digital humanities, the potential reach of the field across and outside the humanities,…

  11. High resolution upgrade of the ATF damping ring BPM system

    International Nuclear Information System (INIS)

    Terunuma, N.; Urakawa, J.; Frisch, J.; May, J.; McCormick, D.; Nelson, J.; Seryi, A.; Smith, T.; Woodley, M.; Briegel, C.; Dysert, R.

    2008-01-01

    A beam position monitor (BPM) upgrade at the KEK Accelerator Test Facility (ATF) damping ring has been accomplished in its first stage, carried out by a KEK/FNAL/SLAC collaboration under the umbrella of the global ILC R and D effort. The upgrade consists of a high resolution, high reproducibility read-out system, based on analog and digital downconversion techniques, digital signal processing, and also tests a new automatic gain error correction schema. The technical concept and realization, as well as preliminary results of beam studies are presented

  12. The Digital Life History Project: Intergenerational Collaborative Research

    Science.gov (United States)

    Loe, Meika

    2013-01-01

    This article describes the Digital Life History Project, a 10-week "lab" linked to a course on aging, in which students and community-dwelling elders work together to create a short digital story honoring the elder's life. After two interview sessions, the pair works together to produce a 3- to 5-minute digital life story narrated by the elder.…

  13. [Managing digital medical imaging projects in healthcare services: lessons learned].

    Science.gov (United States)

    Rojas de la Escalera, D

    2013-01-01

    Medical imaging is one of the most important diagnostic instruments in clinical practice. The technological development of digital medical imaging has enabled healthcare services to undertake large scale projects that require the participation and collaboration of many professionals of varied backgrounds and interests as well as substantial investments in infrastructures. Rather than focusing on systems for dealing with digital medical images, this article deals with the management of projects for implementing these systems, reviewing various organizational, technological, and human factors that are critical to ensure the success of these projects and to guarantee the compatibility and integration of digital medical imaging systems with other health information systems. To this end, the author relates several lessons learned from a review of the literature and the author's own experience in the technical coordination of digital medical imaging projects. Copyright © 2012 SERAM. Published by Elsevier Espana. All rights reserved.

  14. Five TWh saved on profitable upgrading

    International Nuclear Information System (INIS)

    Bakken, Stein Arne.

    1999-01-01

    Article. In Norway, a project is planned to evaluate the upgrading potential of the hydroelectric power sector. The article criticizes the authorities for not supporting the upgrading of hydroelectric power plants in their eager to promote the development of wind power. An important contribution of the planned project will be a book from which the utilities may get advice on measures of upgrading. Generators and control systems account for 80% of the faults and interruptions in the power utilities. The turbine technology has made important progress in the 1990s. By pure upgrading measures alone, the turbine efficiencies may be increased enough for an additional 3 TWh to be taken out from the Norwegian hydroelectric power system. Today, the price of imported carbon-based Danish power determines whether the utilities find it profitable to rehabilitate the hydroelectric plants. The energy potential of upgrading is estimated to be 5 TWh. This energy can be generated with known technology and with no serious consequences for the environment

  15. Recovery Act. Tapoco project. Cheoah upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Tran, Paul [Alcoa Inc., Alcoa Center, PA (United States)

    2013-10-02

    Under Funding Opportunity Announcement Number: DE-FOA-0000120, Recovery Act: Hydroelectric Facility Modernization, Alcoa Power Generating Inc. (APGI), a fully owned subsidiary of Alcoa Inc., implemented major upgrades at its Cheoah hydroelectric facility near Robbinsville, North Carolina.

  16. Upgrading of Intermediate Bio-Oil Produced by Catalytic Pyrolysis

    Energy Technology Data Exchange (ETDEWEB)

    Abdullah, Zia [Battelle Memorial Inst., Columbus, OH (United States); Chadwell, Brad [Battelle Memorial Inst., Columbus, OH (United States); Taha, Rachid [Battelle Memorial Inst., Columbus, OH (United States); Hindin, Barry [Battelle Memorial Inst., Columbus, OH (United States); Ralston, Kevin [Battelle Memorial Inst., Columbus, OH (United States)

    2015-06-30

    The objectives of this project were to (1) develop a process to upgrade catalytic pyrolysis bio-oil, (2) investigate new upgrading catalysts suited for upgrading catalytic pyrolysis bio-oil, (3) demonstrate upgrading system operation for more than 1,000 hours using a single catalyst charge, and (4) produce a final upgraded product that can be blended to 30 percent by weight with petroleum fuels or that is compatible with existing petroleum refining operations. This project has, to the best of our knowledge, for the first time enabled a commercially viable bio-oil hydrotreatment process to produce renewable blend stock for transportation fuels.

  17. Completion of the ATLAS control system upgrade

    International Nuclear Information System (INIS)

    Munson, F. H.

    1998-01-01

    In the fall of 1992 at the SNEAP(Symposium of North Eastern Accelerator Personnel) a project to up grade the ATLAS (Argonne Tandem Linear Accelerator System) control system was first reported. Not unlike the accelerator it services the control system will continue to evolve. However, the first of this year has marked the completion of this most recent upgrade project. Since the control system upgrade took place during a period when ATLAS was operating at a record number of hours, special techniques were necessary to enable the development of the new control system ''on line'' while still saving the needs of normal operations. This paper reviews the techniques used for upgrading the ATLAS control system while the system was in use. In addition a summary of the upgrade project and final configuration, as well as some of the features of the new control system is provided

  18. Low-Cost Mapping and Publishing Methods for Landscape Architectural Analysis and Design in Slum-Upgrading Projects

    Directory of Open Access Journals (Sweden)

    Jörg Rekittke

    2011-10-01

    Full Text Available The research project “Grassroots GIS” focuses on the development of low-cost mapping and publishing methods for slums and slum-upgrading projects in Manila. In this project smartphones, collaborative mapping and 3D visualization applications are systematically employed to support landscape architectural analysis and design work in the context of urban poverty and urban informal settlements. In this paper we focus on the description of the developed methods and present preliminary results of this work-in-progress.

  19. SLHC, the High-Luminosity Upgrade (public event)

    CERN Multimedia

    CERN. Geneva

    2010-01-01

    In the morning of June 23rd a public event is organised in CERN's Council Chamber with the aim of providing the particle physics community with up-to-date information about the strategy for the LHC luminosity upgrade and to describe the current status of preparation work. The presentations will provide an overview of the various accelerator sub-projects, the LHC physics prospects and the upgrade plans of ATLAS and CMS. This event is organised in the framework of the SLHC-PP project, which receives funding from the European Commission for the preparatory phase of the LHC High Luminosity Upgrade project. Informing the public is among the objectives of this EU-funded project. A simultaneous transmission of this meeting will be broadcast, available at the following address: http://webcast.cern.ch/

  20. The Phase-1 Upgrade of the ATLAS First Level Calorimeter Trigger

    CERN Document Server

    Andrei, George Victor; The ATLAS collaboration

    2017-01-01

    The ATLAS Level-1 calorimeter trigger is planning a series of upgrades in order to face the challenges posed by the upcoming increase of the LHC luminosity. The hardware built for the Phase-1 upgrade will be installed during the long shutdown of the LHC starting in 2019, with the aim of being fully commissioned before the restart in 2021. The upgrade will benefit from new front end electronics for parts of the calorimeter which provide the trigger system with digital data with a tenfold increase in granularity. This makes possible the use of more complex algorithms than currently used and while maintaining low trigger thresholds under much harsher collision conditions. Of principal significance among these harsher conditions will be the increased number interactions per bunch crossing, known as pile-up. The Level-1 calorimeter system upgrade consists of an active and a passive system for digital data distribution and three different Feature EXtraction systems (FEXs) which run complex algorithms to identify el...

  1. Managing projects in a digital government | Onyemaobi | Journal of ...

    African Journals Online (AJOL)

    The process of developing a new system in a Digital Government is a kind of planned ... management ensures the application of information technology knowledge, ... Keywords: Digital Government, System Development, Project Management, ...

  2. Advanced conceptual design report: T Plant secondary containment and leak detection upgrades. Project W-259

    International Nuclear Information System (INIS)

    Hookfin, J.D.

    1995-01-01

    The T Plant facilities in the 200-West Area of the Hanford site were constructed in the early 1940s to produce nuclear materials in support of national defense activities. T Plant includes the 271-T facility, the 221-T facility, and several support facilities (eg, 2706-T), utilities, and tanks/piping systems. T Plant has been recommended as the primary interim decontamination facility for the Hanford site. Project W-259 will provide capital upgrades to the T Plant facilities to comply with Federal and State of Washington environmental regulations for secondary containment and leak detection. This document provides an advanced conceptual design concept that complies with functional requirements for the T Plant Secondary Containment and Leak Detection upgrades

  3. Digital Collections Are a Sprint, Not a Marathon: Adapting Scrum Project Management Techniques to Library Digital Initiatives

    Directory of Open Access Journals (Sweden)

    Michael Dulock

    2015-12-01

    Full Text Available This article describes a case study in which a small team from the digital initiatives group and metadata services department at the University of Colorado Boulder (CU-Boulder Libraries conducted a pilot of the Scrum project management framework. The pilot team organized digital initiatives work into short, fixed intervals called sprints—a key component of Scrum. Over a year of working in the modified framework yielded significant improvements to digital collection work, including increased production of digital objects and surrogate records, accelerated publication of digital collections, and an increase in the number of concurrent projects. Adoption of sprints has improved communication and cooperation among participants, reinforced teamwork, and enhanced their ability to adapt to shifting priorities.

  4. 76 FR 23795 - Low-Power Television and Translator Upgrade Program: Notice of Final Closing Date

    Science.gov (United States)

    2011-04-28

    .... 110418247-1247-01] Low-Power Television and Translator Upgrade Program: Notice of Final Closing Date AGENCY... receipt of applications for the Low-Power Television and Translator Upgrade Program (Upgrade Program) will... Rules to Establish Rules for Digital Low Power Television, Television Translator, and Television Booster...

  5. PBX-M upgrade for advanced stabilization and profile control studies

    International Nuclear Information System (INIS)

    Kugel, H.W.; Kozub, T.; Barnes, G.

    1995-01-01

    PBX-M upgrades have been in progress for enhanced capability and reliability. These include upgrades to the vessel O-ring system for impurity control, the Ion Bernstein Wave and Lower Hybrid Current Drive Systems for plasma profile control, a double viewing upper and lower CHERS based Poloidal Rotation Diagnostic, and a new digital plasma control system

  6. Digital Display Integration Project Project Online 2.0

    International Nuclear Information System (INIS)

    Bardsley, J. N.

    1999-01-01

    The electronic display industry is changing in three important ways. First, the dominance of the cathode ray tube (CRT) is being challenged by the development of flat panel displays (FPDs). This will lead to the availability of displays of higher performance, albeit at greater cost. Secondly, the analog interfaces between displays that show data and the computers that generate the data are being replaced by digital connections. Finally, a high-resolution display is becoming the most expensive component in computer system for homes and small offices. It is therefore desirable that the useful lifetime of the display extend over several years and that the electronics allows the display to be used with many different image sources. Hopefully, the necessity of having three or four large CRTs in one office to accommodate different computer operating systems or communication protocols will soon disappear. Instead, we hope to see a set of flat panels that can be switched to show several independent images from multiple sources or a composite image from a single source. The more rapid rate of technological improvements and the higher cost of flat panel displays raise the incentive for greater planning and guidance in the acquisition and integration of high performance displays into large organizations, such as LLNL. The goal of the Digital Display Integration Project (DDIP) is to provide such support. This will be achieved through collaboration with leading suppliers of displays, communications equipment and image-processing products, and by greater exchange of information within the Laboratory. The project will start in October 1999. During the first two years (FY2000-1), the primary focus of the program will be upon: introducing displays with high information content (over 5M pixels); facilitating the transition from analog to digital interfaces; enabling data transfer from key computer platforms; incorporating optical communications to remove length restrictions on data

  7. UPGRADES

    CERN Multimedia

    D. Contardo and J. Spalding

    2012-01-01

      Good progress is being made on the projects that will be installed during LS1. CSC chamber production for ME4/2 is progressing at a rate of four chambers per month, with 25 built so far, and the new electronics for ME1/1 is undergoing a pre-production integration testing. For the RPC chambers, gap production is underway with first deliveries to the chamber assembly sites at CERN and Ghent. The third site at Mumbai will begin production next month. For the PMT replacement in the forward hadron calorimeters (HF), the 1728 PMTs are all characterised and ready to be installed. Testing of the electronics boards is going well. Preparations to replace the HPDs in the outer calorimeter (HO) with SiPMs are also on-track. All components are at CERN and burn-in of the new front-end electronics is proceeding. There are three major upgrade projects targeting the period from LS1 through LS2: a new pixel detector, upgraded photo-detectors and electronics for HCAL, and development of a new L1 Trigger. The new ...

  8. UPGRADES

    CERN Multimedia

    D. Contardo and J. Spalding

    2013-01-01

    The three post-LS1 Phase 1 Upgrade projects (the L1-Trigger, Pixel Tracker, and HCAL) are all making excellent progress and are transitioning from the prototype to the execution phase. Meanwhile plans are developing for Phase 2, a major Upgrade programme targeting the third long shutdown, LS3. News on Phase 1 is included under the respective projects; we only provide a brief summary here. Phase 1 The plan for the L1 Trigger relies on the installation during the present shutdown of optical splitting for the Trigger input signals. This will allow the new Trigger system to be brought online and fully commissioned during beam operation in 2015, while CMS relies on the existing legacy Trigger for physics. Once fully commissioned the experiment can switch over to the new Trigger, which will provide greatly improved performance at high event pile-up, by 2016. System tests of the splitter system, and of the new architecture of the calorimeter trigger were very successful, and the work in LS1 is on-track. Prototype ...

  9. The Qumran Visualization Project: Prospects for Digital Humanities in Theological Libraries

    Directory of Open Access Journals (Sweden)

    Benjamin P. Murphy

    2012-05-01

    Full Text Available Digital Humanities are a hot topic in disciplines as varied as literature, history and cultural studies, but at present theology and religious studies departments seem to be lagging behind. This essay will offer a critical review of one Digital Humanities project that is relevant to theological libraries and Biblical Studies: the Qumran Visualization Project. The essay will discuss why theological libraries should start considering the Digital Humanities, and then offer some strategies for how libraries can support, promote or otherwise engage with this type of project.

  10. The Bevalac Upgrade Project

    International Nuclear Information System (INIS)

    Alonso, J.R.; Dwinell, R.D.; Feinberg, B.

    1987-03-01

    This paper describes a proposed upgrade of the Bevalac accelerator complex in which the present Bevatron is replaced with a modern, strong-focusing 17 T-m synchrotron. This new ring is designed to accelerate all ions throughout the periodic table with intensities 100 to 1000 times higher than the present Bevatron. It will also provide a substantially improved beam spill structure and will reduce operating costs. A fast extraction capability can be used to inject a future heavy ion storage ring. Pulse-to-pulse switching of energy and ion species is an important goal. The existing injectors, shielding, experimental facilities and utilities of the present Bevalac will remain substantially intact

  11. Building community through a digital literature archive: the case of Ciberia Project

    Directory of Open Access Journals (Sweden)

    Goicoechea, María

    2016-07-01

    Full Text Available Ciberia Project has emerged around the creation of Ciberia, a digital archive dedicated to digital literature in Spanish, with the purpose of making its contents more widely shared and fostering community building around digital literature. This project intends to function as a platform for a community interested and/or specialized in new creative forms of literary publishing, using the Ciberia database as the confluence point and origin of collective interaction, creation and reflection on digital literature and its ramifications in the field of literary publishing. This paper provides a description of the digital library Ciberia, and its spin-off, the web platform Ciberia Project, offering a detailed account of their structure and potentialities.

  12. Operational test report, integrated system test (ventilation upgrade)

    International Nuclear Information System (INIS)

    HARTY, W.M.

    1999-01-01

    Operational Final Test Report for Integrated Systems, Project W-030 (Phase 2 test, RECIRC and HIGH-HEAT Modes). Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks, including upgraded vapor space cooling and filtered venting of tanks AY101, AY102, AZ101, AZ102

  13. Operational test report integrated system test (ventilation upgrade)

    Energy Technology Data Exchange (ETDEWEB)

    HARTY, W.M.

    1999-10-05

    Operational Final Test Report for Integrated Systems, Project W-030 (Phase 2 test, RECIRC and HIGH-HEAT Modes). Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks, including upgraded vapor space cooling and filtered venting of tanks AY101, Ay102, AZ101, AZ102.

  14. Conceptual design report, 219-S secondary containment upgrade, Project W-178

    International Nuclear Information System (INIS)

    Beyer, J.J.

    1993-05-01

    The 219-S Facility is located in the 200-West Area on the Hanford Site and was constructed in 1951. The facility receives and treats liquid, low-level mixed waste from the 222-S Laboratory prior to transfer of that waste to the SY Tank Farm. The 219-S Facility consists of Cell A containing Tanks 101 and 102 and Cell B containing Tank 103 and a spare space. Project W-178 will modify the 219-S Facility to bring it into compliance with the tank system standards in WAC 173-303-640. The secondary containment upgrade will consist of a stainless steel cell liner in both Cell A and the spare space in Cell B. Additionally, Cell B will be modified by taking Tank 103 out of service and installing a new tank: Tank 104. The construction work will be accomplished in phases to minimize service interruption to the 222-S Laboratory. The proposed design and construction method is the most cost effective of four alternatives evaluated during a value engineering session. Project W-178 is a fiscal year 1995 Line Item. Total estimated construction costs of the project are $2,600,000; other project costs are $710,000. The total project cost is $3,300,000

  15. 47 CFR 74.785 - Low power TV digital data service pilot project.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Low power TV digital data service pilot project... Power TV, TV Translator, and TV Booster Stations § 74.785 Low power TV digital data service pilot project. Low power TV stations authorized pursuant to the LPTV Digital Data Services Act (Public Law 106...

  16. Development of a time-to-digital converter ASIC for the upgrade of the ATLAS Monitored Drift Tube detector

    Science.gov (United States)

    Wang, Jinhong; Liang, Yu; Xiao, Xiong; An, Qi; Chapman, John W.; Dai, Tiesheng; Zhou, Bing; Zhu, Junjie; Zhao, Lei

    2018-02-01

    The upgrade of the ATLAS muon spectrometer for the high-luminosity LHC requires new trigger and readout electronics for various elements of the detector. We present the design of a time-to-digital converter (TDC) ASIC prototype for the ATLAS Monitored Drift Tube (MDT) detector. The chip was fabricated in a GlobalFoundries 130 nm CMOS technology. Studies indicate that its timing and power dissipation characteristics meet the design specifications, with a timing bin variation of ±40 ps for all 48 TDC slices and a power dissipation of about 6.5 mW per slice.

  17. High Resolution BPM Upgrade for the ATF Damping Ring at KEK

    International Nuclear Information System (INIS)

    Eddy, N.; Briegel, C.; Fellenz, B.; Gianfelice-Wendt, E.; Prieto, P.; Rechenmacher, R.; Semenov, A.; Voy, D.; Wendt, M.; Zhang, D.; Terunuma, N.

    2011-01-01

    A beam position monitor (BPM) upgrade at the KEK Accelerator Test Facility (ATF) damping ring has been accomplished, carried out by a KEK/FNAL/SLAC collaboration under the umbrella of the global ILC R and D effort. The upgrade consists of a high resolution, high reproducibility read-out system, based on analog and digital down-conversion techniques, digital signal processing, and also implements a new automatic gain error correction schema. The technical concept and realization as well as results of beam studies are presented. The next generation of linear colliders require ultra-low vertical emittance of <2 pm-rad. The damping ring at the KEK Accelerator Test Facility (ATF) is designed to demonstrate this mission critical goal. A high resolution beam position monitor (BPM) system for the damping ring is one of the key tools for realizing this goal. The BPM system needs to provide two distnict measurements. First, a very high resolution (∼100-200nm) closed-orbit measurement which is averaged over many turns and realized with narrowband filter techniques - 'narrowband mode'. This is needed to monitor and steer the beam along an optimum orbit and to facilitate beam-based alignment to minimize non-linear field effects. Second, is the ability to make turn by turn (TBT) measurements to support optics studies and corrections necessary to achieve the design performance. As the TBT measurement necessitates a wider bandwidth, it is often referred to as 'wideband mode'. The BPM upgrade was initiated as a KEK/SLAC/FNAL collaboration in the frame of the Global Design Initiative of the International Linear Collider. The project was realized and completed using Japan-US funds with Fermilab as the core partner.

  18. Phase 1 upgrade of the CMS forward hadronic calorimeter

    CERN Document Server

    Noonan, Daniel Christopher

    2017-01-01

    The CMS experiment at the Large Hadron Collider at CERN is upgrading the photo- detection and readout system of the forward hadronic calorimeter. The phase 1 upgrade of the CMS forward calorimeter requires the replacement of the current photomultiplier tubes, as well as the installation of a new front-end readout system. The new photomultiplier tubes contain a thinner window as well as multi-anode readout. The front-end electronics will use the QIE10 ASIC which combines signal digitization with timing information. The major components of the upgrade as well as the current status are described in this paper.

  19. Upgrade of Instrumentation for Purdue Reactor PUR-1

    International Nuclear Information System (INIS)

    Revankar, S.T.; Merritt, E.; Bean, R.

    2000-01-01

    The major objective of this program was to upgrade and replace instruments and equipment that significantly improve the performance, control and operational capability of the Purdue University nuclear reactor (PUR-1). Under this major objective two projects on instrument upgrade were implemented. The first one was to convert the vacuum tube control and safety amplifiers (CSA) to solid state electronics, and the other was to upgrade the electrical and electronic shielding. This report is the annual report and gives the efforts and progress achieved on these two projects from July 1999 to June 2000

  20. The Students Upgrading through Computer and Career Education Systems Services (Project SUCCESS). 1990-91 Final Evaluation Profile. OREA Report.

    Science.gov (United States)

    New York City Board of Education, Brooklyn, NY. Office of Research, Evaluation, and Assessment.

    An evaluation was done of the New York City Public Schools' Student Upgrading through Computer and Career Education Systems Services Program (Project SUCCESS). Project SUCCESS operated at 3 high schools in Brooklyn and Manhattan (Murry Bergtraum High School, Edward R. Murrow High School, and John Dewey High School). It enrolled limited English…

  1. Project W-314 specific test and evaluation plan for 241-AY-02A pump pit upgrade

    International Nuclear Information System (INIS)

    Hays, W.H.

    1998-01-01

    This Specific Test and Evaluation Plan (STEP) defines the test and evaluation activities encompassing the upgrade of the 241-AY-02A Pump Pit for the W-314 Project. The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AY-02A Pump Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system's performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP)

  2. Project W-314 specific test and evaluation plan for 241-AY-01A pump pit upgrade

    International Nuclear Information System (INIS)

    Hays, W.H.

    1998-01-01

    This Specific Test and Evaluation Plan (STEP) defines the test and evaluation activities encompassing the upgrade of the 241-AY-0IA Pump Pit for the W-314 Project. The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AY-01A Pump Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system's performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP)

  3. Major upgrades of the high frequency B-dot probe diagnostic suite on ASDEX Upgrade

    Directory of Open Access Journals (Sweden)

    Ochoukov Roman

    2017-01-01

    Full Text Available The high frequency B-dot (HFB probe diagnostic on the ASDEX Upgrade tokamak has undergone a considerable upgrade during the 2016 opening of the torus. The probe coverage is now greatly expanded toroidally, as well as radially with the addition of probes on the high field side and the removable manipulator head. A new 2-channel fast digitizer now allows to examine and record radio frequency (RF wave emissions emanating from the plasma in the ion cyclotron range of frequencies (ICRF. Possible studies that can be achieved now include: a study of core ICRF power absorption efficiency; a study of ion cyclotron emissions from the plasma generated by energetic ions; and study of ICRF wave/plasma turbulence interactions in the scrape-off layer region.

  4. Certification of digital system software

    International Nuclear Information System (INIS)

    Waclo, J.; Cook, B.; Adomaitis, D.

    1991-01-01

    The activities involved in the successful application of digital systems to Nuclear Protection functions is not achieved through happenstance. At Westinghouse there has been a longstanding program to utilize digital state of the art technology for protection system advancement. Thereby gaining the advantages of increased system reliability, performance, ease of operation and reduced maintenance costs. This paper describes the Westinghouse background and experience in the safety system software development process, including Verification and Validation, and its application to protection system qualification and the successful use for licensing the Eagle 21 Digital Process Protection System Upgrade. In addition, the lessons learned from this experience are discussed from the perspective of improving the development process through applying feedback of the measurements made on the process and the software product quality. The goal of this process optimization is to produce the highest possible software quality while recognizing the real world constraints of available resources, project schedule and the regulatory policies that are customary in the nuclear industry

  5. Upgrade of the ATLAS Tile Calorimeter Electronics

    International Nuclear Information System (INIS)

    Carrió, F

    2015-01-01

    The Tile Calorimeter (TileCal) is the hadronic calorimeter covering the central region of the ATLAS experiment at LHC. The TileCal readout consists of about 10000 channels. The bulk of its upgrade will occur for the High Luminosity LHC phase (Phase-II) where the peak luminosity will increase 5 times compared to the design luminosity (10 34 cm −2 s −1 ) but with maintained energy (i.e. 7+7 TeV). An additional increase of the average luminosity with a factor of 2 can be achieved by luminosity levelling. This upgrade is expected to happen around 2024. The TileCal upgrade aims at replacing the majority of the on- and off- detector electronics to the extent that all calorimeter signals will be digitized and sent to the off-detector electronics in the counting room. To achieve the required reliability, redundancy has been introduced at different levels. Three different options are presently being investigated for the front-end electronic upgrade. Extensive test beam studies will determine which option will be selected. 10 Gbps optical links are used to read out all digitized data to the counting room while 5 Gbps down-links are used for synchronization, configuration and detector control. For the off-detector electronics a pre-processor (sROD) is being developed, which takes care of the initial trigger processing while temporarily storing the main data flow in pipeline and derandomizer memories. One demonstrator prototype module with the new calorimeter module electronics, but still compatible with the present system, is planned to be inserted in ATLAS this year

  6. Get a winning Oracle upgrade session using the quarterback approach

    Science.gov (United States)

    Anderson, G.

    2002-01-01

    Upgrades, upgrades... too much customer down time. Find out how we shrunk our production upgrade schedule 40% from our estimate of 10 days 12 hours to 6 days 2 hours using the quarterback approach. So your upgrade is not that complex, come anyway. This approach is scalable to any size project and will be extremely valuable.

  7. Pipeline transportation of emerging partially upgraded bitumen

    International Nuclear Information System (INIS)

    Luhning, R.W.; Anand, A.; Blackmore, T.; Lawson, D.S.

    2002-01-01

    The recoverable reserves of Canada's vast oil deposits is estimated to be 335 billion barrels (bbl), most of which are in the Alberta oil sands. Canada was the largest import supplier of crude oil to the United States in 2001, followed by Saudi Arabia. By 2011, the production of oil sands is expected to increase to 50 per cent of Canada's oil, and conventional oil production will decline as more production will be provided by synthetic light oil and bitumen. This paper lists the announced oil sands projects. If all are to proceed, production would reach 3,445,000 bbl per day by 2011. The three main challenges regarding the transportation and marketing of this new production were described. The first is to expand the physical capacity of existing pipelines. The second is the supply of low viscosity diluent (such as natural gas condensate or synthetic diluent) to reduce the viscosity and density of the bitumen as it passes through the pipelines. The current pipeline specifications and procedures to transport partially upgraded products are presented. The final challenge is the projected refinery market constraint to process the bitumen and synthetic light oil into consumer fuel products. These challenges can be addressed by modifying refineries and increasing Canadian access in Petroleum Administration Defense District (PADD) II and IV. The technology for partial upgrading of bitumen to produce pipeline specification oil, reduce diluent requirements and add sales value, is currently under development. The number of existing refineries to potentially accept partially upgraded product is listed. The partially upgraded bitumen will be in demand for additional upgrading to end user products, and new opportunities will be presented as additional pipeline capacity is made available to transport crude to U.S. markets and overseas. The paper describes the following emerging partial upgrading methods: the OrCrude upgrading process, rapid thermal processing, CPJ process for

  8. The Phase-I Upgrade of the ATLAS First Level Calorimeter Trigger

    CERN Document Server

    Andrei, George Victor; The ATLAS collaboration

    2017-01-01

    The ATLAS Level-1 calorimeter trigger is planning a series of upgrades in order to face the challenges posed by the upcoming increase of the LHC luminosity. The upgrade will benefit from new front-end electronics for parts of the calorimeter that provide the trigger system with digital data with a tenfold increase in granularity. This makes possible the implementation of more efficient algorithms than currently used to maintain the low trigger thresholds at much harsher LHC collision conditions. The Level-1 calorimeter system upgrade consists of an active and a passive system for digital data distribution, and three different Feature Extractor systems which run complex algorithms to identify various physics object candidates. The algorithms are implemented in firmware on custom electronics boards with up to four high speed processing FPGAs. The main characteristics of the electronic boards are a high input bandwidth, up to several TB/s per module, implemented through optical receivers, and a large number of o...

  9. Design concepts for a nuclear digital instrumentation and control system platform

    International Nuclear Information System (INIS)

    Ou, T. C.; Chen, C. K.; Chen, P. J.; Shyu, S. S.; Lee, C. L.; Hsieh, S. F.

    2010-10-01

    The objective of this paper is to present the development results of the nuclear instrumentation and control system in Taiwan. As the Taiwan nuclear power plants age, the need to consider upgrading of both their safety and non-safety-related instrumentation and control systems becomes more urgent. Meanwhile, the digital instrumentation and control system that is based on current fast evolving electronic and information technologies are difficult to maintain effectively. Therefore, Institute of Nuclear Energy Research was made a decision to promote the Taiwan Nuclear Instrumentation and Control System project to collaborate with domestic electronic industry to establish self-reliant capabilities on the design, manufacturing, and application of nuclear instrumentation and control systems with newer technology. In the case of safety-related applications like nuclear instrumentation and control, safety-oriented quality control is required. In order to establish a generic qualified digital platform, the world-wide licensing experience should be considered in the licensing process. This paper describes the qualification and certification tools by IEC 61508 for design and development of safety related equipment and explains the basis for many decisions made while performing the digital upgrade. (Author)

  10. Upgrader alley : oil sands fever strikes Edmonton

    International Nuclear Information System (INIS)

    Griffiths, M.; Dyer, S.

    2008-01-01

    Large-scale industrial complexes called upgraders are similar to oil refineries. Several upgraders are planned for the area just northeast of Edmonton, known as Upgrader Alley. Concerns have been expressed over the potential congestion and environmental impacts of these upgraders. Upgraders will also attract other industry, and the cumulative effects of development will have major impacts on the region, its people and the natural environment. The report provided an overview of Upgrader Alley, with reference to what is driving development; upgrading issues; what Upgrader Alley will look like; and how much water Upgrader Alley needs. The report also discussed impacts on the land, air quality, and greenhouse gases. Water demand issues were discussed with reference to impacts on the North Saskatchewan River, water levels, water quality, a water management framework, and groundwater resources. Cumulative impacts were also presented. It was concluded that if all the projects for which applications had been submitted were approved, the rapid pace of growth in Upgrader Alley would mimic that of Fort McMurray. If the rate of development were somewhat slower, there would be more time to develop and implement plans to reduce the impacts. 189 refs., 6 tabs., 14 figs

  11. Upgrading the Atlas Tile Calorimeter Electronics

    CERN Document Server

    Popeneciu, G; The ATLAS collaboration

    2014-01-01

    Tile Calorimeter is the central hadronic calorimeter of the ATLAS experiment at LHC. Around 2024, after the upgrade of the LHC the peak luminosity will increase by a factor of 5 compared to the design value, thus requiring an upgrade of the Tile Calorimeter readout electronics. Except the photomultipliers tubes (PMTs), most of the on- and off-detector electronics will be replaced, with the aim of digitizing all PMT pulses at the front-end level and sending them with 10 Gb/s optical links to the back-end electronics. One demonstrator prototype module is planned to be inserted in Tile Calorimeter in 2015 that will include hybrid electronic components able to probe the new design.

  12. Upgrade of the ATLAS Tile Calorimeter Electronics

    CERN Document Server

    Moreno, P; The ATLAS collaboration

    2014-01-01

    The Tile Calorimeter (TileCal) is the hadronic calorimeter covering the central region of the ATLAS experiment at LHC. The TileCal readout consists of about 10000 channels. The bulk of its upgrade will occur for the High Luminosity LHC phase (phase 2) where the peak luminosity will increase 5x compared to the design luminosity (10^34 cm−2s−1) but with maintained energy (i.e. 7+7 TeV). An additional increase of the average luminosity with a factor of 2 can be achieved by luminosity leveling. This upgrade is expected to happen around 2023. The TileCal upgrade aims at replacing the majority of the on- and off-detector electronics to the extent that all calorimeter signals will be digitized and sent to the off-detector electronics in the counting room. To achieve the required reliability, redundancy has been introduced at different levels. Three different options are presently being investigated for the front-end electronic upgrade. Extensive test beam studies will determine which option will be selected. 10 ...

  13. Safety system upgrades to a research reactor: A regulatory perspective

    International Nuclear Information System (INIS)

    Lamarre, G.B.; Martin, W.G.

    2003-01-01

    The NRU (National Research Universal) reactor, located at the Chalk River Laboratories of Atomic Energy of Canada Limited (AECL), first achieved criticality November 3, 1957. AECL continues to operate NRU for research to support safety and reliability studies for CANDU reactors and as a major supplier of medical radioisotopes. Following a detailed systematic review and assessment of NRU's design and the condition of its primary systems, AECL formally notified the Canadian Nuclear Safety Commission's (CNSC) predecessor - the Atomic Energy Control Board - in 1992 of its intention to upgrade NRU's safety systems. AECL proposed seven major upgrades to provide improvements in shutdown capability, heat removal, confinement, and reactor monitoring, particularly during and after a seismic event. From a CNSC perspective, these upgrades were necessary to meet modern safety standards. From the start of the upgrades project, the CNSC provided regulatory oversight aimed at ensuring that AECL maintained a structured approach to the upgrades. The elements of the approach include, but are not limited to, the determination of project milestones and target dates; the formalization of the design process and project quality assurance requirements; the requirements for updated documentation, including safety reports, safety notes and commissioning reports; and the approval and authorization process. This paper details, from a regulatory perspective, the structured approach used in approving the design, construction, commissioning and subsequent operation of safety system upgrades for an existing and operating research reactor, including the many challenges faced when attempting to balance the requirements of the upgrades project with AECL's need to keep NRU operating to meet its important research and production objectives. (author)

  14. EBR-II Cover Gas Cleanup System (CGCS) upgrade graphical interface design

    International Nuclear Information System (INIS)

    Staffon, J.D.; Peters, G.G.

    1992-01-01

    Technology advances in the past few years have prompted an effort at Argonne National Laboratory to replace existing equipment with high performance digital computers and color graphic displays. Improved operation of process systems can be achieved by utilizing state-of-the-art computer technology in the areas of process control and process monitoring. The Cover Gas Cleanup System (CGCS) at EBR-II is the first system to be upgraded with high performance digital equipment. The upgrade consisted of a main control computer, a distributed control computer, a front end input/output computer, a main graphics interface terminal, and a remote graphics interface terminal. This paper describes the main control computer and the operator interface control software

  15. Digital Handover of Data from Building Projects to Building Operation

    DEFF Research Database (Denmark)

    Jensen, Per Anker

    2006-01-01

    pro-jects to building operation. This project started in 2004 with research and analyses fol-lowed by development of a proposal for client requirements and in 2005 a first test on a real construction project has been carried out. After revision of the requirements a second test will be started early...... and construction and on the other side in building opera-tion and facilities management. In Denmark the government has launched a development program called Digital Construction and one of the projects concerns specifying require-ments for building clients in relation to digital handover of data from construction...... by a consortium called DACaPo consisting of a building client/facilities manager, a consulting company, a contractor and a university institute. This paper presents some of the results from the project with the main focus on the initial research....

  16. Computer codes used during upgrading activities at MINT TRIGA reactor

    International Nuclear Information System (INIS)

    Mohammad Suhaimi Kassim; Adnan Bokhari; Mohd Idris Taib

    1999-01-01

    MINT TRIGA Reactor is a 1-MW swimming pool nuclear research reactor commissioned in 1982. In 1993, a project was initiated to upgrade the thermal power to 2 MW. The IAEA assistance was sought to assist the various activities relevant to an upgrading exercise. For neutronics calculations, the IAEA has provided expert assistance to introduce the WIMS code, TRIGAP, and EXTERMINATOR2. For thermal-hydraulics calculations, PARET and RELAP5 were introduced. Shielding codes include ANISN and MERCURE. However, in the middle of 1997, MINT has decided to change the scope of the project to safety upgrading of the MINT Reactor. This paper describes some of the activities carried out during the upgrading process. (author)

  17. Prototype application for the control and debugging of CMS upgrade projects

    CERN Document Server

    Mills-Howell, Dominic

    2016-01-01

    Following the high-luminosity upgrades of the LHC, many subsystems of the CMS experiment require upgrading and others are using the LHC shutdowns as an opportunity to improve performance. The upgrades, themselves, have served to highlight the exigency to attack problems that were previously unaddressed. One such problem is the need for a tool that allows the users to easily monitor, debug, and test custom hardware. Such a tool could be abstracted to work, in theory, with various hardware devices. In addition to having the added benefit of being able to support future hardware, and maintaining parallel operations with the remaining control software.

  18. SLHC, the high-luminosity upgrade (public event)

    CERN Multimedia

    CERN. Geneva

    2009-01-01

    In the morning of February 26th a public event is organised in CERN's main auditorium with the aim of informing the particle physics community about the current status of preparation work for the future LHC luminosity upgrade (Phase 1 and Phase 2). The presentations will provide an overview of the various accelerator sub-projects, the physics potential and the experiment upgrade plans. This event is organised in the framework of the SLHC-PP project, which receives funding from the European Commission for the preparatory phase of the SLHC project. Informing the public about the overall status of SLHC is among the objectives of this EU-funded project. A simultaneous transmission of this meeting will be broadcast, available at the following address: http://webcast.cern.ch/

  19. Royal Military College of Canada SLOWPOKE-2 facility. Integrated regulating and instrumentation system (SIRCIS) upgrade project

    International Nuclear Information System (INIS)

    Corcoran, W.P.; Nielsen, K.S.; Kelly, D.G.; Weir, R.D.

    2013-01-01

    The SLOWPOKE-2 Facility at the Royal Military College of Canada has operated the only digitally controlled SLOWPOKE reactor since 2001 (Version 1.0). The present work describes ongoing project development to provide a robust digital reactor control system that is consistent with Aging Management as summarized in the Facility's Life Cycle Management and Maintenance Plan. The project has transitioned from a post-graduate research activity to a comprehensively managed project supported by a team of RMCC professional and technical staff who have delivered an update of the V1.1 system software and hardware implementation that is consistent with best Canadian nuclear industry practice. The challenges associated with the implementation of Version 2.0 in February 2012, the lessons learned from this implementation, and the applications of these lessons to a redesign and rewrite of the RMCC SLOWPOKE-2 digital instrumentation and regulating system (Version 3) are discussed. (author)

  20. Status of the ATLAS control system upgrade

    International Nuclear Information System (INIS)

    Munson, F.H.; Ferraretto, M.; Rutherford, B.

    1992-01-01

    Certain components of the ATLAS control system are two generations behind today's technology. It has been decided to upgrade the control system. in part, by replacing Digital Equipment Corporation (DEC) PDP-11 computers with present-day VAX technology. Two primary goals have been defined for the upgraded control system. The first of these goals is to keep additional ''in-house'' written software to a minimum, while providing the portability necessary to ensure the continued use of existing software. In an attempt to achieve this goal, commercially-available software has been utilized to provide a foundation for the final control-system configuration. The second goal is to develop the new control system, while not interfering with accelerator operations. This paper describes some of the motivation for upgrading the ATLAS control system, the basic features of the new control system, and the present status of the system's development

  1. Empowering Students in Information Literacy Practices Using a Collaborative Digital Library for School Projects

    Directory of Open Access Journals (Sweden)

    Abrizah Abdullah

    2008-09-01

    Full Text Available This paper examines the affordances that a collaborative digital library (CDL can bring to bear on supporting information literacy practices in the digital information environment. It suggests that the digital library can contribute to student empowerment in information literacy practices while searching, using and collaboratively building the digital library resources. To illustrate this, the authors have been experimenting with the implementation of an integrated information literacy model based on Eisenberg and Berkowitz’ Big 6 Model and describes the CDL features in association with the information literacy dimensions in this model. The CDL focuses on the project-based learning approach to conduct students’ project, which supports specific information behaviors that underpin research and learning such as information seeking, browsing, encountering, foraging, sharing, gathering, filtering, and using. Findings regarding teachers’ reception of the digital library are encouraging as they feel the relevance of the digital library to the current requirement of the students’ project and its potential to entrench information and resource study skills through project-based learning.

  2. Upgrade of the ATLAS Hadronic Tile Calorimeter for the High Luminosity LHC

    CERN Document Server

    Hildebrand, Kevin; The ATLAS collaboration

    2017-01-01

    The Tile Calorimeter is the hadronic calorimeter covering the central region of the ATLAS detector at the Large Hadron Collider. It is a scintillator-steel sampling calorimeter read out via wavelength shifting fibers coupled to photomultiplier tubes (PMT). The PMT signals are digitized and stored on detector until a trigger is received. The Large Hadron Collider (LHC) has envisaged a series of upgrades towards a High Luminosity LHC (HL-LHC) delivering five times the LHC nominal instantaneous luminosity. The ATLAS Phase II upgrade (2024-2025) will accommodate the upgrade of the detector and data acquisition system for the HL-LHC. In particular, TileCal will undergo a major replacement of its on- and off-detector electronics. In the new architecture, all signals will be digitized and then transferred directly to the off-detector electronics, where the signals will be reconstructed, stored, and sent to the first level of trigger at the rate of 40 MHz. This will provide better precision of the calorimeter signals...

  3. A human reliability assessment screening method for the NRU upgrade project

    International Nuclear Information System (INIS)

    Bremner, F.M.; Alsop, C.J.

    1997-01-01

    The National Research Universal (NRU) reactor is a 130MW, low pressure, heavy water cooled and moderated research reactor. The reactor is used for research, both in support of Canada's CANDU development program, and for a wide variety of other research applications. In addition, NRU plays an important part in the production of medical isotopes, e.g., generating 80% of worldwide supplies of Molybdenum-99. NRU is owned and operated by Atomic Energy of Canada Ltd. (AECL), and is currently undergoing upgrading as part of AECL's continuing commitment to operate their facilities in a safe manner. As part of these upgrades both deterministic and probabilistic safety assessments are being carried out. It was recognized that the assignment of Human Error Probabilities (HEPs) is an important part of the Probabilistic Safety Assessment (PSA) studies, particularly for a facility whose design predates modern ergonomic practices, and which will undergo a series of backfitted modifications whilst continuing to operate. A simple Human Reliability Assessment (HRA) screening method, looking at both pre- and post-accident errors, was used in the initial safety studies. However, following review of this method within AECL and externally by the regulator, it was judged that benefits could be gained for future error reduction by including additional features, as later described in this document. The HRA development project consisted of several stages; needs analysis, literature review, development of method (including testing and evaluation), and implementation. This paper discusses each of these stages in further detail. (author)

  4. Argonne's atlas control system upgrade

    International Nuclear Information System (INIS)

    Munson, F.; Quock, D.; Chapin, B.; Figueroa, J.

    1999-01-01

    The ATLAS facility (Argonne Tandem-Linac Accelerator System) is located at the Argonne National Laboratory. The facility is a tool used in nuclear and atomic physics research, which focuses primarily on heavy-ion physics. The accelerator as well as its control system are evolutionary in nature, and consequently, continue to advance. In 1998 the most recent project to upgrade the ATLAS control system was completed. This paper briefly reviews the upgrade, and summarizes the configuration and features of the resulting control system

  5. Evaluation of the AccessIT Project and the Distance LearningProgramme on Digitization

    Directory of Open Access Journals (Sweden)

    Bülent Yılmaz

    2013-11-01

    Full Text Available AccessIT is an EU-funded project under EU’s Education and Culture Program aiming to digitize a certain amount of sources that are part of the cultural heritage, to transfer them to Europeana, and to sustain the education infrastructure to achieve this goal in the partner countries of Greece, Poland, Serbia, Turkey and UK. In this study, in addition to the general evaluation of the AccessIT Project, it is aimed to investigate the awareness of participants in thefield on digitization and digital content management, their self-efficiency perceptions, and to evaluate the education program based on the data acquired from the survey of544participants who were enrolled in the distance education program offered within the scope of the project.It was found out in the study that the AccessIT Project has had an important function in Turkey and the distance education program significantly contributed to participants ’ self-efficiency perceptions about digitization.

  6. The ATLAS project: The effects of a constructionist digital laboratory project on undergraduate laboratory performance.

    Science.gov (United States)

    Shoepe, Todd C; Cavedon, Dana K; Derian, Joseph M; Levy, Celine S; Morales, Amy

    2015-01-01

    Anatomical education is a dynamic field where developments in the implementation of constructive, situated-learning show promise in improving student achievement. The purpose of this study was to examine the effectiveness of an individualized, technology heavy project in promoting student performance in a combined anatomy and physiology laboratory course. Mixed-methods research was used to compare two cohorts of anatomy laboratories separated by the adoption of a new laboratory atlas project, which were defined as preceding (PRE) and following the adoption of the Anatomical Teaching and Learning Assessment Study (ATLAS; POST). The ATLAS project required the creation of a student-generated, photographic atlas via acquisition of specimen images taken with tablet technology and digital microscope cameras throughout the semester. Images were transferred to laptops, digitally labeled and photo edited weekly, and compiled into a digital book using Internet publishing freeware for final project submission. An analysis of covariance confirmed that student final examination scores were improved (P project (PRE, n = 75; POST, n = 90; means ± SE; 74.9 ± 0.9 versus 78.1 ± 0.8, respectively) after controlling for cumulative student grade point average. Analysis of questionnaires collected (n = 68) from the post group suggested students identified with atlas objectives, appreciated the comprehensive value in final examination preparation, and the constructionism involved, but recommended alterations in assignment logistics and the format of the final version. Constructionist, comprehensive term-projects utilizing student-preferred technologies could be used to improve performance toward student learning outcomes. © 2014 American Association of Anatomists.

  7. Opening the Arms: The FAB Projects and Digital Resilience

    Science.gov (United States)

    Longden, Alison; Monaghan, Tom; Mycroft, Lou; Kelly, Claire

    2018-01-01

    A chance observation in a staff training session led to a series of action research projects, which dug into why some educators are digitally resistant whilst others, however experienced, are not. The Education and Training Foundation-funded "FAB Projects" have so far spanned three years and three small-scale research investigations and…

  8. Disseminating relevant health information to underserved audiences: implications of the Digital Divide Pilot Projects.

    Science.gov (United States)

    Kreps, Gary L

    2005-10-01

    This paper examines the influence of the digital divide on disparities in health outcomes for vulnerable populations, identifying implications for medical and public libraries. The paper describes the results of the Digital Divide Pilot Projects demonstration research programs funded by the National Cancer Institute to test new strategies for disseminating relevant health information to underserved and at-risk audiences. The Digital Divide Pilot Projects field-tested innovative systemic strategies for helping underserved populations access and utilize relevant health information to make informed health-related decisions about seeking appropriate health care and support, resisting avoidable and significant health risks, and promoting their own health. The paper builds on the Digital Divide Pilot Projects by identifying implications for developing health communication strategies that libraries can adopt to provide digital health information to vulnerable populations.

  9. Expected performance of the upgrade ATLAS experiment for HL-LHC

    CERN Document Server

    Liu, Peilian; The ATLAS collaboration

    2018-01-01

    The Large Hadron Collider (LHC) has been successfully delivering proton-proton collision data at the unprecedented center of mass energy of 13 TeV. An upgrade is planned to increase the instantaneous luminosity delivered by the LHC in what is called the HL-LHC, aiming to deliver a total of up 3000/fb to 4000/fb of data per experiment. To cope with the expected data-taking conditions ATLAS is planning major upgrades of the detector. It is now a critical time for these upgrade projects and during the last year and a half, six Technical Design Reports (TDR) were produced by the ATLAS Collaboration. In these TDRs the physics motivation and benefits of such upgrades are discussed together with details on the upgrade project itself. In this contribution we review the expected performance of the upgraded ATLAS detector and the expected reach for physics measurements as well as the discovery potential for new physics that is expected by the end of the HL-LHC data-taking. The performance of object reconstruction under...

  10. Upgrade of the ATLAS Level-1 Calorimeter Trigger

    CERN Document Server

    AUTHOR|(CDS)2072874

    2014-01-01

    The Level-1 calorimeter trigger (L1Calo) operated successfully during the first data taking phase of the ATLAS experiment at the LHC. Facing the new challenges posed by the upcoming increases of the LHC beam energy and luminosity, and from the experience of the previous running, a series of upgrades is planned for L1Calo. The initial upgrade phase in 2013-14 includes substantial improvements to the analogue and digital signal processing to cope with baseline shifts due to signal pile-up. Additionally a newly introduced system will receive real-time data from both the upgraded L1Calo and L1Muon trigger to perform trigger algorithms based on entire event topologies. During the second upgrade phase in 2018-19 major parts of L1Calo will be rebuilt in order to exploit a tenfold increase in the available calorimeter data granularity compared to that of the current system. The contribution gives an overview of the existing system and the lessons learned during the first period of LHC data taking. Based on these, the...

  11. Upgrade of the ATLAS Level-1 Calorimeter Trigger

    CERN Document Server

    Mueller, Felix; The ATLAS collaboration

    2014-01-01

    The Level-1 calorimeter trigger (L1Calo) operated successfully during the first data taking phase of the ATLAS experiment at the LHC. Based on the lessons learned , a series of upgrades is planned for L1Calo to face the new challenges posed by the upcoming increases of the LHC beam energy and luminosity. The initial upgrade phase in 2013-14 includes substantial improvements to the analogue and digital signal processing to cope with baseline shifts due to signal pile-up. Additionally a newly introduced system will receive real-time data from both the upgraded L1Calo and L1Muon trigger to perform trigger algorithms based on entire event topologies. During the second upgrade phase in 2018-19 major parts of L1Calo will be rebuilt in order to exploit a tenfold increase in the available calorimeter data granularity compared to that of the current system. In this contribution we present the lessons learned during the first period of LHC data taking. Based on these we discuss the expected performance improvements tog...

  12. Upgrade of the ATLAS Tile Calorimeter Electronics

    CERN Document Server

    Carrio, F

    2015-01-01

    The Tile Calorimeter (TileCal) is the hadronic calorimeter covering the central region of the ATLAS experiment at LHC. The TileCal readout consists of about 10000 channels. The bulk of its upgrade will occur for the High Luminosity LHC phase (P hase - II ) where the pea k luminosity will increase 5 times compared to the design luminosity (10 34 cm −2 s −1 ) but with maintained energy (i.e. 7+7 TeV). An additional increase of the average luminosity with a factor of 2 can be achieved by luminosity levelling. This upgrade is expe cted to happen around 202 4 . The TileCal upgrade aims at replacing the majority of the on - and off - detector electronics to the extent that all calorimeter signals will be digitized and sent to the off - detector electronics in the counting room. To achieve th e required reliability, redundancy has been introduced at different levels. Three different options are presently being investiga...

  13. Upgrading the ATLAS Tile Calorimeter electronics

    CERN Document Server

    Souza, J; The ATLAS collaboration

    2014-01-01

    The Tile Calorimeter (TileCal) is the hadronic calorimeter covering the central region of the ATLAS experiment at LHC. The TileCal readout consists of about 10000 channels. Its main upgrade will occur for the High Luminosity LHC phase (phase 2) where the peak luminosity will increase 5-fold compared to the design luminosity (10exp34 cm−2s−1) but with maintained energy (i.e. 7+7 TeV). An additional increase of the average luminosity with a factor of 2 can be achieved by luminosity leveling. This upgrade will probably happen around 2023. The upgrade aims at replacing the majority of the on- and off-detector electronics so that all calorimeter signals are directly digitized and sent to the off-detector electronics in the counting room. To achieve the required reliability, redundancy has been introduced at different levels. The smallest independent on-detector electronics module has been reduced from 45 channels to 6, greatly reducing the consequences of a failure in the on-detector electronics. The size of t...

  14. [Reconstruction and measurement of a digital dental model using grating projection and reverse engineering].

    Science.gov (United States)

    Zhenzhen, Wang; Yi, Lu; Jun, Song; Jun, Chen; Qin, Zhou

    2015-02-01

    This work lays the foundation for establishing a digital model database with normal occlusion. A digital dental cast is acquired through grating projection, and model features are measured through reverse engineering. The grating projection system controlled by a computer was projected onto the surface of a normal dental model. Three-dimensional contour data were obtained through multi-angle shooting. A three-dimensional model was constructed, and the model features were analyzed by using reverse engineering. The digital model was compared with the plaster model to determine the accuracy of the measurement system. The structure of three-dimensional reconstruction model was clear. The digital models of two measurements exhibited no significant difference (P > 0.05). When digital and plaster models were measured, we found that the crown length and arch width were not statistically different (P > 0.05), whereas the difference between the crown width and arch length was statistically significant (P model by using the grating projection technique and reverse engineering can be used for dental model measurement in clinic al and scientific research and can provide a scientific method for establishing a digital model database with normal occlusion.

  15. Preliminary studies for the upgrading of the ININ TRIGA MARK III reactor

    International Nuclear Information System (INIS)

    Aguilar, J.V.

    1984-01-01

    An increase on the demand of services has led to the -consideration of reactor upgrading, for which a project has been proposed. This project includes the modification of the reactor core, using FLIP type (Erbium loaded, 70% U-235 enriched) fuel elements and the upgrading of the control - console which implies a careful analysis of the Safety -considerations involved in the system modification. In this paper, a brief description is given of: The modifications intended; Pre-operational tests for the system components to be modified; The safety report needed for the licensing of the upgraded reactor; The project management and evaluation

  16. Status of the Upgrade of the CERN PS Booster

    CERN Document Server

    Hanke, K; Angoletta, M; Bartmann, W; Bartolome, S; Benedetto, E; Bertone, C; Blas, A; Bonnal, P; Borburgh, J; Bozzini, D; Butterworth, A; Carli, C; Carlier, E; Cole, J; Dahlen, P; Delonca, M; Dobers, T; Findlay, A; Froeschl, R; Hansen, J; Hay, D; Jensen, S; Lacroix, J; Le Roux, P; Lopez Hernandez, L; Maglioni, C; Masi, A; Mason, G; Mathot, S; Mikulec, B; Muttoni, Y; Newborough, A; Nisbet, D; Olek, S; Paoluzzi, M; Perillo-Marcone, A; Pittet, S; Puccio, B; Raginel, V; Riffaud, B; Ruehl, I; Sarrió Martínez, A; Tan, J; Todd, B; Venturi, V; Weterings, W

    2013-01-01

    The CERN PS Booster (PSB) is presently undergoing an ambitious consolidation and upgrade program within the frame of the LHC Injectors Upgrade (LIU) project. This program comprises a new injection scheme for H- ions from CERN’s new Linac4, the replacement of the main RF systems and an energy upgrade of the PSB rings from 1.4 to 2 GeV which includes the replacement of the main magnet power supply as well as the upgrade of the extraction equipment. This paper describes the status and plans of this work program.

  17. Radarsat Antarctic Mapping Project Digital Elevation Model, Version 2

    Data.gov (United States)

    National Aeronautics and Space Administration — The high-resolution Radarsat Antarctic Mapping Project (RAMP) Digital Elevation Model (DEM) combines topographic data from a variety of sources to provide consistent...

  18. Disseminating relevant health information to underserved audiences: implications of the Digital Divide Pilot Projects*

    Science.gov (United States)

    Kreps, Gary L.

    2005-01-01

    Objective: This paper examines the influence of the digital divide on disparities in health outcomes for vulnerable populations, identifying implications for medical and public libraries. Method: The paper describes the results of the Digital Divide Pilot Projects demonstration research programs funded by the National Cancer Institute to test new strategies for disseminating relevant health information to underserved and at-risk audiences. Results: The Digital Divide Pilot Projects field-tested innovative systemic strategies for helping underserved populations access and utilize relevant health information to make informed health-related decisions about seeking appropriate health care and support, resisting avoidable and significant health risks, and promoting their own health. Implications: The paper builds on the Digital Divide Pilot Projects by identifying implications for developing health communication strategies that libraries can adopt to provide digital health information to vulnerable populations. PMID:16239960

  19. Upgrading Temelin to international standards

    International Nuclear Information System (INIS)

    Anderson, J.J.; Gisoni, G.A.; Stormer, T.D.

    1994-01-01

    The digital technology being installed to upgrade the Instrumentation and Control system at the Temelin twin VVER-1000 station in the Czech Republic will allow the plant to operate more safely because it allows key information to be organised and presented to the operators, enabling them to make better informed decisions about the status of the plant. The new system is based on proven technology previously applied at Beznau in Switzerland and Sizewell B in the UK. (author)

  20. Plans for the upgrade of the LHC injectors

    CERN Document Server

    Garoby, R; Goddard, B; Hanke, K; Meddahi, M; Vretenar, M

    2011-01-01

    The LHC injectors upgrade (LIU) project has been launched at the end of 2010 to prepare the CERN accelerator complex for reliably providing beam with the challenging characteristics required by the high luminosity LHC until at least 2030. Based on the work already started on Linac4, PS Booster, PS and SPS, the LIU project coordinates studies and implementation, and interfaces with the high luminosity LHC (HL-LHC) project which looks after the upgrade of the LHC itself, expected by the end of the present decade. The anticipated beam characteristics are described, as well as the status of the studies and the solutions envisaged for improving the injector performances.

  1. ATLAS Upgrade Plans

    CERN Document Server

    Hopkins, W; The ATLAS collaboration

    2014-01-01

    After the successful LHC operation at the center-of-mass energies of 7 and 8 TeV in 2010-2012, plans are actively advancing for a series of upgrades of the accelerator, culminating roughly ten years from now in the high-luminosity LHC (HL-LHC) project, delivering of the order of five times the LHC nominal instantaneous luminosity along with luminosity leveling. The final goal is to extend the dataset from about few hundred fb−1 expected for LHC running to 3000/fb by around 2035 for ATLAS and CMS. In parallel, the experiments need to be keep lockstep with the accelerator to accommodate running beyond the nominal luminosity this decade. Current planning in ATLAS envisions significant upgrades to the detector during the consolidation of the LHC to reach full LHC energy and further upgrades. The challenge of coping with the HL-LHC instantaneous and integrated luminosity, along with the associated radiation levels, requires further major changes to the ATLAS detector. The designs are developing rapidly for a new...

  2. Safety upgrades to the NRU research reactor

    International Nuclear Information System (INIS)

    DeAbreu, B.; Mark, J.M.; Mutterback, E.J.

    1998-01-01

    The NRU (National Research Universal) Reactor is a 135 MW thermal research facility located at Chalk River Laboratories, and is owned and operated by Atomic Energy of Canada Limited. One of the largest and most versatile research reactors in the world, it serves as the R and D workhorse for Canada's CANDU business while at the same time filling the role as one of the world's major producers of medical radioisotopes. AECL plans to extend operation of the NRU reactor to approximately the year 2005 when a new replacement, the Irradiation Research Facility (IRF) will be available. To achieve this, AECL has undertaken a program of safety reassessment and upgrades to enhance the level of safety consistent with modem requirements. An engineering assessment/inspection of critical systems, equipment and components was completed and seven major safety upgrades are being designed and installed. These upgrades will significantly reduce the reactor's vulnerability to common mode failures and external hazards, with particular emphasis on seismic protection. The scheduled completion date for the project is 1999 December at a cost approximately twice the annual operating cost. All work on the NRU upgrade project is planned and integrated into the regular operating cycles of the reactor; no major outages are anticipated. This paper describes the safety upgrades and discusses the technical and managerial challenges involved in extending the operating life of the NRU reactor. (author)

  3. Safety upgrading of Novi Han Repository under IAEA TC Project BUL/4/005 achievements and future plans

    International Nuclear Information System (INIS)

    Stefanova, I.

    2003-01-01

    The report presents the safety upgrading of the Novi Han Repository under the IAEA TC Project BUL/4/005. The Project covers: identification of radionuclide inventory; characterisation of the disposal vaults; site characterisation; safety assessment; upgrading of the monitoring and radiation control; selection of treatment and conditioning processes and a conceptual design for a new waste processing and storage facility and other direct measures for safety improvement. The current inventory is identified and presented in the report. Schemes of the vault for solid wastes and vault for biological wastes are given, demonstrating reinforced concrete, stainless steel lining, and hydro insulation are presented. Several studies for safety assessment are made between 1997 and 2003. The operational safety assessment for disposal in existing facilities gives the annual risk for: spilling of waste package during upload (7.58.10 -9 ); spilling of waste package in transport accident (2.90.10 -9 ); fire scenario (3.50.10 - 1 3 ); radionuclide release due to flooding or earthquake (5.05.10 -4 ). The monitoring radiation control is upgraded according to the regulatory guidance and covered the site, restricted zone (1 km) and supervised zone (5 km). The types of analyses made are: Direct measurement of the dose rate -TLD; Direct measurements of the dose rate - portable surveillance monitors; In situ gamma spectrometry; Gamma spectrometry; Gross beta, gross alpha; Liquid scintillation spectrometry. The analyses show no transfer od radionuclides to the environment. The individual radiation control shows no evidence for specific radiation pathology. The operational radiation control service premises and transport vehicles. The following is measured: gamma dose rate; beta exposure; alpha exposure; neutron radiation; contamination level. Under the development is a detailed technical design supply of equipment for characterization of waste, including hot cell for control over high level

  4. How much does it cost? The LIFE Project - Costing Models for Digital Curation and Preservation

    Directory of Open Access Journals (Sweden)

    Richard Davies

    2007-11-01

    Full Text Available Digital preservation is concerned with the long-term safekeeping of electronic resources. How can we be confident of their permanence, if we do not know the cost of preservation? The LIFE (Lifecycle Information for E-Literature Project has made a major step forward in understanding the long-term costs in this complex area. The LIFE Project has developed a methodology to model the digital lifecycle and to calculate the costs of preserving digital information for the next 5, 10 or 100 years. National and higher education (HE libraries can now apply this process and plan effectively for the preservation of their digital collections. Based on previous work undertaken on the lifecycles of paper-based materials, the LIFE Project created a lifecycle model and applied it to real-life digital collections across a diverse subject range. Three case studies examined the everyday operations, processes and costs involved in their respective activities. The results were then used to calculate the direct costs for each element of the digital lifecycle. The Project has made major advances in costing preservation activities, as well as making detailed costs of real digital preservation activities available. The second phase of LIFE (LIFE2, which recently started, aims to refine the lifecycle methodology and to add a greater range and breadth to the project with additional exemplar case studies.

  5. The UKIRT Upgrades Programme

    Science.gov (United States)

    Adamson, Andy; Davies, John; Robson, Ian

    Tim Hawarden presented this paper to the 30th anniversary workshop, just a month before his untimely death. The editors have done their best to convert his talk into this paper, and gratefully acknowledge the assistance of Nick Rees (a member of the Upgrades team, now at Diamond Light Source). Tim's discussion concerned the UKIRT Upgrades Project, which ran through the 1990s and transformed the telescope and made it truly competitive on the world stage for operation into the twenty-first century. The reference list at the end of the paper is comprehensive; some of these are referred to in the paper itself and some are included for completeness only.

  6. Evaluation of Fatih Project in the Frame of Digital Divide

    Science.gov (United States)

    Karabacak, Kerim

    2016-01-01

    The aim of this research realized at the general survey model is to evaluate "FATIH Project" in the frame of digital divide by determining the effects of the distributed tablets to the students being educated at K-12 schools on digital divide. Sample is taking from the 9th grade students in Sakarya city in the 2013-2014 academic session.…

  7. Computer-aided detection of breast carcinoma in standard mammographic projections with digital mammography

    International Nuclear Information System (INIS)

    Destounis, S.; Hanson, S.

    2007-01-01

    This study was conducted to retrospectively evaluate a computer-aided detection system's ability to detect breast carcinoma in multiple standard mammographic projections. Forty-five lesions in 44 patients imaged with digital mammography (Selenia registered , Hologic, Bedford, MA; Senographe registered , GE, Milwaukee, WI) and had computer-aided detection (CAD, Image-checker registered V 8.3.15, Hologic/R2, Santa Clara, CA) applied at the time of examination were identified for review; all were subsequently recommended to biopsy where cancer was revealed. These lesions were determined by the study Radiologist to be visible in both standard mammographic images (mediolateral oblique, MLO; craniocaudal, CC). For each patient, case data included patient age, tissue density, lesion type, BIRADS registered assessment, lesion size, lesion visibility-visible on MLO and/or CC view, ability of CAD to correctly mark the cancerous lesion, number of CAD marks per image, needle core biopsy results and surgical pathologic correlation. For this study cohort. CAD lesion/case sensitivity of 87% (n = 39) was found and image sensitivity was found to be 69% (n = 31) for MLO view and 78% (n = 35) for the CC view. For the study cohort, cases presented with a median of four marks per cases (range 0-13). Eighty-four percent (n = 38) of lesions proceeded to excision; initial needle biopsy pathology was upgraded at surgical excision from in situ disease to invasive for 24% (n = 9) lesions. CAD has demonstrated the potential to detect mammographically visible cancers in multiple standard mammographic projections in all categories of lesions in this study cohort. (orig.)

  8. D OE upgrade muon electronics design

    International Nuclear Information System (INIS)

    Baldin, B.; Green, D.; Haggerty, H.; Hansen, S.

    1994-11-01

    The planned luminosity for the upgrade is ten times higher than at present (L ∼ 10 32 cm -2 s -1 ) and involves a time between collisions as small as 132 ns. To operate in this environment, completely new electronics is required for the 17,500 proportional drift tubes of the system. These electronics include a deadtimeless readout, a digital TDC with about 1 ns binning for the wire signals, fast charge integrators and pipelined ADCs for digitizing the pad electrode signals, a new wire signal triggering scheme and its associated trigger logic, and high level DSP processing. Some test results of measurements performed on prototype channels and a comparison with the existing electronics are presented

  9. Three-dimensional digital projection in neurosurgical education: technical note.

    Science.gov (United States)

    Martins, Carolina; Ribas, Eduardo Carvalhal; Rhoton, Albert L; Ribas, Guilherme Carvalhal

    2015-10-01

    Three-dimensional images have become an important tool in teaching surgical anatomy, and its didactic power is enhanced when combined with 3D surgical images and videos. This paper describes the method used by the last author (G.C.R.) since 2002 to project 3D anatomical and surgical images using a computer source. Projecting 3D images requires the superposition of 2 similar but slightly different images of the same object. The set of images, one mimicking the view of the left eye and the other mimicking the view of the right eye, constitute the stereoscopic pair and can be processed using anaglyphic or horizontal-vertical polarization of light for individual use or presentation to larger audiences. Classically, 3D projection could be obtained by using a double set of slides, projected through 2 slide projectors, each of them equipped with complementary filters, shooting over a medium that keeps light polarized (a silver screen) and having the audience wear appropriate glasses. More recently, a digital method of 3D projection has been perfected. In this method, a personal computer is used as the source of the images, which are arranged in a Microsoft PowerPoint presentation. A beam splitter device is used to connect the computer source to 2 digital, portable projectors. Filters, a silver screen, and glasses are used, similar to the classic method. Among other advantages, this method brings flexibility to 3D presentations by allowing the combination of 3D anatomical and surgical still images and videos. It eliminates the need for using film and film developing, lowering the costs of the process. In using small, powerful digital projectors, this method substitutes for the previous technology, without incurring a loss of quality, and enhances portability.

  10. Modernization of control system using the digital control system

    International Nuclear Information System (INIS)

    Carrasco, J. A.; Fernandez, L.; Jimenez, A.

    2002-01-01

    Nowadays, all plant automation tendencies are based on the use of Digital Control System. In big industrial plants the control systems employed are Distributed Control Systems (DCS). The addition of these systems in nuclear power plants,implies an important adaptation process, because most of them were installed using analog control systems. This paper presents the objectives and the first results obtained, in a modernization project, focused in obtaining an engineering platform for making test and analysis of changes prior to their implementation in a nuclear plant. Modernization, Upgrade, DCS, Automation, Simulation, Training. (Author)

  11. TCV divertor upgrade for alternative magnetic configurations

    Directory of Open Access Journals (Sweden)

    H. Reimerdes

    2017-08-01

    Full Text Available The Swiss Plasma Center (SPC is planning a divertor upgrade for the TCV tokamak. The upgrade aims at extending the research of conventional and alternative divertor configurations to operational scenarios and divertor regimes of greater relevance for a fusion reactor. The main elements of the upgrade are the installation of an in-vessel structure to form a divertor chamber of variable closure and enhanced diagnostic capabilities, an increase of the pumping capability of the divertor chamber and the addition of new divertor poloidal field coils. The project follows a staged approach and is carried out in parallel with an upgrade of the TCV heating system. First calculations using the EMC3-Eirene code indicate that realistic baffles together with the planned heating upgrade will allow for a significantly higher compression of neutral particles in the divertor, which is a prerequisite to test the power dissipation potential of various divertor configurations.

  12. Processing options for bitumen upgrading

    International Nuclear Information System (INIS)

    Harji, A.N.; Koppel, P.E.; Mazurek, W.L.; Meysami, P.

    2003-01-01

    It is estimated that 178 billion barrels of oil can be recovered from Alberta's vast heavy oil reserves. The challenge lies in the logistics of recovering, upgrading and transporting the oil to market. The Canadian Energy Research Institute conducted a recent study to determine market potential by 2007 for diluted bitumen and synthetic crude oil produced from upgraded bitumen. The viability for a wide range of bitumen feedstocks was assessed along with the sensitivity of refinery demand to their prices. The 3 major markets for western Canadian bitumen include PADD 2 in the United States, western Canada, and Ontario. Bitumen is too viscous to transport by pipeline and cannot be processed by most of the existing refineries. Therefore, in order to develop a mass market for the product, bitumen must undergo the energy intensive upgrading process at existing refineries. The factors impacting which method of upgrading is most suitable were discussed with particular attention to the impact that Canada's ratification of the Kyoto Protocol may have on Alberta's bitumen resource in terms of costs of complying with greenhouse gas reduction initiatives. The authors emphasized that it is crucial to customize an upgrading project to meet site and market specific factors. 8 refs., 3 tabs., 3 figs

  13. Benefits of Advanced Control Room Technologies: Phase One Upgrades to the HSSL, Research Plan, and Performance Measures

    Energy Technology Data Exchange (ETDEWEB)

    Le Blanc, Katya [Idaho National Lab. (INL), Idaho Falls, ID (United States); Joe, Jeffrey [Idaho National Lab. (INL), Idaho Falls, ID (United States); Rice, Brandon [Idaho National Lab. (INL), Idaho Falls, ID (United States); Ulrich, Thomas [Idaho National Lab. (INL), Idaho Falls, ID (United States); Boring, Ronald [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2015-05-01

    Control Room modernization is an important part of life extension for the existing light water reactor fleet. None of the 99 currently operating commercial nuclear power plants in the U.S. has completed a full-scale control room modernization to date. A full-scale modernization might, for example, entail replacement of all analog panels with digital workstations. Such modernizations have been undertaken successfully in upgrades in Europe and Asia, but the U.S. has yet to undertake a control room upgrade of this magnitude. Instead, nuclear power plant main control rooms for the existing commercial reactor fleet remain significantly analog, with only limited digital modernizations. Previous research under the U.S. Department of Energy’s Light Water Reactor Sustainability Program has helped establish a systematic process for control room upgrades that support the transition to a hybrid control room. While the guidance developed to date helps streamline the process of modernization and reduce costs and uncertainty associated with introducing digital control technologies into an existing control room, these upgrades do not achieve the full potential of newer technologies that might otherwise enhance plant and operator performance. The aim of the control room benefits research is to identify previously overlooked benefits of modernization, identify candidate technologies that may facilitate such benefits, and demonstrate these technologies through human factors research. This report describes the initial upgrades to the HSSL and outlines the methodology for a pilot test of the HSSL configuration.

  14. General digitalized system on nuclear power plants

    International Nuclear Information System (INIS)

    Akagi, Katsumi; Kadohara, Hozumi; Taniguchi, Manabu

    2000-01-01

    Hitherto, instrumentation control system in a PWR nuclear power plant has stepwisely adopted digital technology such as application of digital instrumentation control device to ordinary use (primary/secondary system control device, and so on), application of CRT display system to monitoring function, and so forth, to realize load reduction of an operator due to expansion of operation automation range, upgrading of reliability and maintenance due to self-diagnosis function, reduction of mass in cables due to multiple transfer, and upgrading of visual recognition due to information integration. In next term PWR plant instrumentation control system, under consideration of application practice of conventional digital technology, application of general digitalisation system to adopt digitalisation of overall instrumentation control system containing safety protection system, and central instrumentation system (new type of instrumentation system) and to intend to further upgrade economics, maintenance, operability/monitoring under security of reliability/safety is planned. And, together with embodiment of construction program of the next-term plant, verification at the general digitalisation proto-system aiming at establishment of basic technology on the system is carried out. Then, here was described on abstract of the general digitalisation system and characteristics of a digital type safety protection apparatus to be adopted in the next-term plant. (G.K.)

  15. The ALICE TPC Upgrad

    Science.gov (United States)

    Castro, Andrew; Alice-Usa Collaboration; Alice-Tpc Collaboration

    2017-09-01

    The Time Projection Chamber (TPC) currently used for ALICE (A Large Ion Collider Experiment at CERN) is a gaseous tracking detector used to study both proton-proton and heavy-ion collisions at the Large Hadron Collider (LHC) In order to accommodate the higher luminosit collisions planned for the LHC Run-3 starting in 2021, the ALICE-TPC will undergo a major upgrade during the next LHC shut down. The TPC is limited to a read out of 1000 Hz in minimum bias events due to the intrinsic dead time associated with back ion flow in the multi wire proportional chambers (MWPC) in the TPC. The TPC upgrade will handle the increase in event readout to 50 kHz for heavy ion minimum bias triggered events expected with the Run-3 luminosity by switching the MWPCs to a stack of four Gaseous Electron Multiplier (GEM) foils. The GEM layers will combine different hole pitches to reduce the dead time while maintaining the current spatial and energy resolution of the existing TPC. Undertaking the upgrade of the TPC represents a massive endeavor in terms of design, production, construction, quality assurance, and installation, thus the upgrade is coordinated over a number of institutes worldwide. The talk will go over the physics motivation for the upgrade, the ALICE-USA contribution to the construction of Inner Read Out Chambers IROCs, and QA from the first chambers built in the U.S

  16. FE-I4 Chip Development for Upgraded ATLAS Pixel Detector at LHC

    CERN Document Server

    Barbero, M; The ATLAS collaboration

    2010-01-01

    A new ATLAS pixel chip FE-I4 has been developed for use in upgraded LHC luminosity environments, including the near-term Insertable B-Layer upgrade. FE-I4 is designed in a 130 nm CMOS technology, presenting advantages in terms of radiation tolerance and digital logic density compared to the 0.25 μm CMOS technology used for the current ATLAS pixel IC, FE-I3. FE-I4 architecture is based on an array of 80×336 pixels, each 50×250 μm2, consisting of analog and digital sections. The analog pixel section is designed for low power consumption and compatibility to several sensor candidates. It is based on a two-stage architecture with a pre-amp AC-coupled to a second stage of amplification. It features leakage current compensation circuitry, local 4-bit pre-amp feedback tuning and a discriminator locally adjusted through 5 configuration bits. The digital architecture is based on a 4-pixel unit called Pixel Digital Region (PDR) allowing for local storage of hits in 5-deep data buffers at pixel level for the duratio...

  17. The Upgrade of the ATLAS First Level Calorimeter Trigger

    CERN Document Server

    Yamamoto, Shimpei; The ATLAS collaboration

    2015-01-01

    The Level-1 calorimeter trigger (L1Calo) operated successfully during the first data taking phase of the ATLAS experiment at the LHC. Based on the lessons learned, a series of upgrades is planned for L1Calo to face the new challenges posed by the upcoming increases of the LHC beam energy and luminosity. The initial upgrade phase in 2013-15 includes substantial improvements to the analogue and digital signal processing to cope with baseline shifts due to signal pile-up. Additionally a newly introduced system will receive real-time data from both the upgraded L1Calo and L1Muon trigger to perform trigger algorithms based on entire event topologies. During the second upgrade phase in 2018-19 major parts of L1Calo will be rebuilt in order to exploit a tenfold increase in the available calorimeter data granularity compared to that of the current system. In this contribution we present the lessons learned during the first period of LHC data taking. Based on these we discuss the expected performance improvements toge...

  18. RF upgrade program in LHC injectors and LHC machine

    International Nuclear Information System (INIS)

    Jensen, E.

    2012-01-01

    The main themes of the RF upgrade program are: the Linac4 project, the LLRF-upgrade and the study of a tuning-free wide-band system for PSB, the upgrade of the SPS 800 MHz amplifiers and beam controls and the upgrade of the transverse dampers of the LHC. Whilst LHC Splice Consolidation is certainly the top priority for LS1, some necessary RF consolidation and upgrade is necessary to assure the LHC performance for the next 3- year run period. This includes: 1) necessary maintenance and consolidation work that could not fit the shorter technical stops during the last years, 2) the upgrade of the SPS 200 MHz system from presently 4 to 6 cavities and possibly 3) the replacement of one LHC cavity module. On the longer term, the LHC luminosity upgrade requires crab cavities, for which some preparatory work in SPS Coldex must be scheduled during LS1. (author)

  19. Digital detection systems for projection radiography

    International Nuclear Information System (INIS)

    Schulz, R.F.

    2001-01-01

    This article gives a survey of digital X-ray detection systems for projection radiography. The different principles are compared and some general characteristics are derived. The basic conversion mechanisms in the absorption layers are described. The basic principles of solid state X-ray detectors and their general characteristics are elucidated as well as some similarities with detectors for computed tomography. Some important application and system aspects are considered. An outlook on further possible developments in this field is given. (orig.) [de

  20. Control system upgrades support better plant economics

    International Nuclear Information System (INIS)

    De Grosbois, J.; Hepburn, A.; Storey, H.; Basso, R.; Kumar, V.

    2002-01-01

    This paper (second in the series, see [1]) provides insight on how nuclear plants can achieve better efficiencies and reduced operations and maintenance (O and M) costs through focused control system upgrades. An understanding of this relationship is necessary to properly assess the economics of plant refurbishment decisions. Traditional economic feasibility assessment methods such as benefit cost analysis (BCA), internal rate of return (IRR), benefit cost ratios (B/C), or payback analysis are often performed without full consideration of project alternatives, quantified benefits, and life cycle costing. Consideration must be given to not only capital cost and project risk, but also to the potential economic benefits of new technology and added functionality offered by plant upgrades. Recent experience shows that if upgrades are focused on priority objectives, and are effectively implemented, they can deliver significant payback over the life of the plant, sometimes orders of magnitude higher than their initial capital cost. The following discussion explores some of the key issues and rationale behind upgrade decisions and their impact on improved plant efficiency and reduced O and M costs. A subsequent paper will explain how the justification for these improvements can be captured in an economic analysis and feasibility study to support strategic decision-making in a plant refurbishment context. (author)

  1. LHCb DAQ network upgrade tests

    CERN Document Server

    Pisani, Flavio

    2013-01-01

    My project concerned the evaluation of new technologies for the DAQ network upgrade of LHCb. The first part consisted in developing and Open Flow-based Clos network. This new technology is very interesting and powerful but, as shown by the results, it still needs further improvements. The second part consisted in testing and benchmarking 40GbE network equipment: Mellanox MT27500, Chelsio T580 and Huawei Cloud Engine 12804. An event-building simulation is currently been performed in order to check the feasibility of the DAQ network upgrade in LS2. The first results are promising.

  2. Pelvic digital subtraction catheter angiography-Are routine oblique projections necessary?

    International Nuclear Information System (INIS)

    Rane, Neil; Imam, Atique; Foley, Peter; Timmons, Grace; Uberoi, Raman

    2011-01-01

    The oblique projection is used widely in imaging of the lower vascular tree. Much of the evidence justifying the oblique projection is anecdotal. This study compares the sensitivity of the anteroposterior (AP) projection alone in lower limb vascular catheter angiography to that combined with the oblique projection. 110 digitally subtracted angiograms were analysed initially on AP and subsequently on oblique views. Oblique imaging increases confidence, demonstrates stenoses not seen on AP and changes the diagnosis. This supports the use of the oblique projection in lower limb vascular interventional imaging.

  3. The ASDEX upgrade digital video processing system for real-time machine protection

    Energy Technology Data Exchange (ETDEWEB)

    Drube, Reinhard, E-mail: reinhard.drube@ipp.mpg.de [Max-Planck-Institut für Plasmaphysik, EURATOM Association, Boltzmannstr. 2, 85748 Garching (Germany); Neu, Gregor [Max-Planck-Institut für Plasmaphysik, EURATOM Association, Boltzmannstr. 2, 85748 Garching (Germany); Cole, Richard H.; Lüddecke, Klaus [Unlimited Computer Systems GmbH, Seeshaupterstr. 15, 82393 Iffeldorf (Germany); Lunt, Tilmann; Herrmann, Albrecht [Max-Planck-Institut für Plasmaphysik, EURATOM Association, Boltzmannstr. 2, 85748 Garching (Germany)

    2013-11-15

    Highlights: • We present the Real-Time Video diagnostic system of ASDEX Upgrade. • We show the implemented image processing algorithms for machine protection. • The way to achieve a robust operating multi-threading Real-Time system is described. -- Abstract: This paper describes the design, implementation, and operation of the Video Real-Time (VRT) diagnostic system of the ASDEX Upgrade plasma experiment and its integration with the ASDEX Upgrade Discharge Control System (DCS). Hot spots produced by heating systems erroneously or accidentally hitting the vessel walls, or from objects in the vessel reaching into the plasma outer border, show up as bright areas in the videos during and after the reaction. A system to prevent damage to the machine by allowing for intervention in a running discharge of the experiment was proposed and implemented. The VRT was implemented on a multi-core real-time Linux system. Up to 16 analog video channels (color and b/w) are acquired and multiple regions of interest (ROI) are processed on each video frame. Detected critical states can be used to initiate appropriate reactions – e.g. gracefully terminate the discharge. The system has been in routine operation since 2007.

  4. Injection Protection Upgrade for the HL-LHC

    CERN Document Server

    AUTHOR|(CDS)2067108; Biancacci, Nicolo; Bracco, Chiara; Frasciello, Oscar; Gentini, Luca; Goddard, Brennan; Lechner, Anton; Maciariello, Fausto; Perillo Marcone, Antonio; Salvant, Benoit; Shetty, Nikhil Vittal; Steele, Genevieve; Velotti, Francesco; Zobov, Mikhail

    2015-01-01

    The injector complex of the LHC is undergoing important changes in the light of the LIU project to provide brighter beams to the LHC. For this reason and as part of the High Luminosity LHC project the injection protection system of the LHC will be upgraded in the Long Shutdown 2 (2018 - 2019) to be able to protect downstream elements against injection failures with the high brightness, high intensity HL-LHC beams. The upgraded LHC injection protection system will consist of a segmented injection protection absorber TDIS, and auxiliary collimators and masks. The layout modifications are described, and the machine element protection and absorber jaw robustness studies are presented for the new systems.

  5. Public Access to Digital Material; A Call to Researchers: Digital Libraries Need Collaboration across Disciplines; Greenstone: Open-Source Digital Library Software; Retrieval Issues for the Colorado Digitization Project's Heritage Database; Report on the 5th European Conference on Digital Libraries, ECDL 2001; Report on the First Joint Conference on Digital Libraries.

    Science.gov (United States)

    Kahle, Brewster; Prelinger, Rick; Jackson, Mary E.; Boyack, Kevin W.; Wylie, Brian N.; Davidson, George S.; Witten, Ian H.; Bainbridge, David; Boddie, Stefan J.; Garrison, William A.; Cunningham, Sally Jo; Borgman, Christine L.; Hessel, Heather

    2001-01-01

    These six articles discuss various issues relating to digital libraries. Highlights include public access to digital materials; intellectual property concerns; the need for collaboration across disciplines; Greenstone software for construction and presentation of digital information collections; the Colorado Digitization Project; and conferences…

  6. ATLAS calorimeter and topological trigger upgrades for Phase 1

    CERN Document Server

    Silverstein, S

    2011-01-01

    The ATLAS Level-1 Calorimeter Trigger (L1Calo) collaboration is pursuing two hardware upgrade programs for Phase 1 of the LHC upgrade. The first of these is development of a new mixed-signal multi-chip module (MCM) for the PreProcessor system. based on faster FADCs and a modern FPGA. Designed as a drop-in replacement for the existing MCM, the FPGA also enables future upgrades to the PreProcessor algorithms, including enhanced digital filtering and compensation for time-variation of pedestals. It is also planned to augment the current multiplicity-based trigger by adding topology-based algorithms. This is made possible by adding jet and EM/hadron Regions of Interest (ROIs) to the L1Calo real time data path. A synchronous, pipelined topological processor (TP) based on high-density FPGAs and multi-Gbit optical links gathers all ROI information and performs topological algorithms.

  7. Generalized Filtered Back-Projection for Digital Breast Tomosynthesis Reconstruction

    NARCIS (Netherlands)

    Erhard, K.; Grass, M.; Hitziger, S.; Iske, A.; Nielsen, T.

    2012-01-01

    Filtered back-projection (FBP) has been commonly used as an efficient and robust reconstruction technique in tomographic X-ray imagingduring the last decades. For limited angle tomography acquisitions such as digital breast tomosynthesis, however, standard FBP reconstruction algorithms provide poor

  8. Digital project management the complete step-by-step guide to a successful launch

    CERN Document Server

    Olson, Taylor

    2016-01-01

    The digital world is growing and changing at a rate that can seem overwhelming to those project managers who have to keep up with it to build customer-facing solutions and applications. It's rare for project managers working in this field to be provided with much direction or a process by which to carry out a project, and there has been next to nothing available specific to these types of projects in the literary marketplace. Digital Project Management: The Complete Step-by-Step Guide to a Successful Launch was developed to fill this gap by providing the knowledge, best practices and proven steps to consistently managing these types of project successfully from end-to-end now, and in the future with just minor adjustments to adapt to changes in technology.

  9. PG&E's Seismic Network Goes Digital With Strong Motion: Successes and Challenges

    Science.gov (United States)

    Stanton, M. A.; Cullen, J.; McLaren, M. K.

    2008-12-01

    Pacific Gas and Electric Company (PG&E) is in year 3 of a 5-year project to upgrade the Central Coast Seismic Network (CCSN) from analog to digital. Located along the south-central California coast, the CCSN began operation in 1987, with 20 analog stations; 15 vertical component and 5 dual gain 3-component S-13 sensors. The analog signals travel over FM radio telemetry links and voice channels via PG&E's microwave network to our facility in San Francisco (SF), where the A/D conversion is performed on a computer running Earthworm v7.1, which also transmits the data to the USGS in Menlo Park. At the conversion point the dynamic ranges of the vertical and dual-gain sensors are 40-50dB and 60-70dB, respectively. Dynamic range exceedance (data clipping) generally occurs for a M2.5 or greater event within about 40 km of a station. The motivations to upgrade the seismic network were the need for higher dynamic range and to retire obsolete analog transmission equipment. The upgraded digital stations consist of the existing velocity sensors, a 131A-02/3 accelerometer and a Reftek 130-01 Broadband Seismic Recorder for digital data recording and transmission to SF. Vertical only stations have one component of velocity and 3 components of acceleration. Dual gain sites have 3 components of velocity and 3 of acceleration. To date we have successfully upgraded 6 sites; 3 more will be installed by the end of 2008. Some of the advantages of going digital are 1) data is recorded at each site and in SF, 2) substantially increased dynamic range of the velocity sensors to 120dB, as observed by on scale, close-by recordings from a M3.9 San Simeon aftershock on 04/29/2008, 3) accelerometers for on scale recording of large earthquakes, and 4) ability to contribute our strong motion data to USGS ShakeMaps. A significant challenge has been consistent radio communications. To resolve this issue we are installing point-to-multipoint Motorola Canopy spread spectrum radios at the stations and

  10. Equipment and performance upgrade of compact nuclear simulator

    International Nuclear Information System (INIS)

    Park, Jae Chang; Kwon, Kee Choon; Cha, Hyung Ho; Park, Won Man; Song, Soon Ja; Seh, Kyung Won; Joo, Young Chang

    1998-12-01

    In this project, the techniques to upgrade obsolescent nuclear power plant simulation were developed: the simulation code operated in Macro-VAX II has been transplanted to the HP workstation: commercial equipment PLC was adopted for the interface system: the protection logic was developed in the prototype level: and the display system was strengthened. These techniques can be directly used to upgrade other obsolescent simulators

  11. Equipment and performance upgrade of compact nuclear simulator

    Energy Technology Data Exchange (ETDEWEB)

    Park, Jae Chang; Kwon, Kee Choon; Cha, Hyung Ho; Park, Won Man; Song, Soon Ja; Seh, Kyung Won; Joo, Young Chang

    1998-12-01

    In this project, the techniques to upgrade obsolescent nuclear power plant simulation were developed: the simulation code operated in Macro-VAX II has been transplanted to the HP workstation: commercial equipment PLC was adopted for the interface system: the protection logic was developed in the prototype level: and the display system was strengthened. These techniques can be directly used to upgrade other obsolescent simulators.

  12. Magnetic Measurements of Storage Ring Magnets for the APS Upgrade Project

    Energy Technology Data Exchange (ETDEWEB)

    Doose, C.; Dejus, R.; Jaski, M.; Jansma, W.; Collins, J.; Donnelly, A.; Liu, J.; Cease, H.; Decker, G.; Jain, A.; DiMarco, J.

    2017-06-01

    Extensive prototyping of storage ring magnets is ongoing at the Advanced Photon Source (APS) in support of the APS Multi-Bend Achromat (MBA) upgrade project (APS-U) [1]. As part of the R&D activities four quadrupole magnets with slightly different geometries and pole tip materials, and one sextupole magnet with vanadium permendur (VP) pole tips were designed, built and tested. Magnets were measured individually using a rotating coil and a Hall probe for detailed mapping of the magnetic field. Magnets were then assembled and aligned relative to each other on a steel support plate and concrete plinth using precision machined surfaces to gain experience with the alignment method chosen for the APS-U storage ring magnets. The required alignment of magnets on a common support structure is 30 μm rms. Measurements of magnetic field quality, strength and magnet alignment after subjecting the magnets and assemblies to different tests are presented.

  13. The NCI Digital Divide Pilot Projects: implications for cancer education.

    Science.gov (United States)

    Kreps, Gary L; Gustafson, David; Salovey, Peter; Perocchia, Rosemarie Slevin; Wilbright, Wayne; Bright, Mary Anne; Muha, Cathy

    2007-01-01

    The National Cancer Institute (NCI) supported four innovative demonstration research projects, "The Digital Divide Pilot Projects," to test new strategies for disseminating health information via computer to vulnerable consumers. These projects involved active research collaborations between the NCI's Cancer Information Service (CIS) and regional cancer control researchers to field test new approaches for enhancing cancer communication in vulnerable communities. The projects were able to use computers to successfully disseminate relevant cancer information to vulnerable populations. These demonstration research projects suggested effective new strategies for using communication technologies to educate underserved populations about cancer prevention, control, and care.

  14. Progress and plan of KSTAR plasma control system upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Hahn, Sang-hee, E-mail: hahn76@nfri.re.kr [National Fusion Research Institute, Daejeon (Korea, Republic of); Kim, Y.J. [National Fusion Research Institute, Daejeon (Korea, Republic of); Penaflor, B.G. [General Atomics, San Diego, CA (United States); Bak, J.G.; Han, H.; Hong, J.S.; Jeon, Y.M.; Jeong, J.H.; Joung, M.; Juhn, J.W.; Kim, J.S.; Kim, H.S.; Lee, W.R.; Woo, M.H. [National Fusion Research Institute, Daejeon (Korea, Republic of); Eidietis, N.W.; Ferron, J.R.; Humphreys, D.A.; Hyatt, A.; Johnson, R.D.; Piglowski, D.A. [General Atomics, San Diego, CA (United States); and others

    2016-11-15

    Highlights: • Recent achievements of the KSTAR plasma control system are described. • Requirements and results of the testbed system for the future upgrade of the KSTAR plasma control system are presented. • An overview of the upgrade layout based is given. - Abstract: The plasma control system (PCS) has been one of essential systems in annual KSTAR plasma campaigns: starting from a single-process version in 2008, extensive upgrades are done through the previous 7 years in order to achieve major goals of KSTAR performance enhancement. Major implementations are explained in this paper. In consequences of successive upgrades, the present KSTAR PCS is able to achieve ∼48 s of 500 kA plasma pulses with full real-time shaping controls and real-time NB power controls. It has become a huge system capable of dealing with 8 separate categories of algorithms, 26 actuators directly controllable during the shot, and real-time data communication units consisting of +180 analog channels and +600 digital input/outputs through the reflective memory (RFM) network. The next upgrade of the KSTAR PCS is planned in 2015 before the campaign. An overview of the upgrade layout will be given for this paper. The real-time system box is planned to use the CERN MRG-Realtime OS, an ITER-compatible standard operating system. New hardware is developed for faster real-time streaming system for future installations of actuators/diagnostics.

  15. The ATLAS SCT: Commissioning experience and SLHC upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Mitrevski, J. [Santa Cruz Institute for Particle Physics, University of California, Santa Cruz, CA 95064 (United States)], E-mail: Jovan.Mitrevski@cern.ch

    2009-06-01

    The ATLAS Semiconductor Tracker (SCT) has been installed, and fully connected to electrical, optical and cooling services. Commissioning has been performed both with calibration data and cosmic ray events. The cosmics were used to align the detector, measure the hit efficiency and set the timing. The SCT is now ready to take data when the LHC turns on this autumn. At the same time, it is clear that the present ATLAS tracker will need to be renewed for projected luminosity upgrade of the LHC, the SLHC. This is mainly driven by occupancy and radiation hardness issues. The new tracker will likely be entirely made of silicon, with the space of the present SCT largely taken up by detectors with much shorter strips. Several large-scale R and D projects on the sensors and module concepts for this upgrade are running, including sensor and module prototyping. We will report upon the commissioning experience from the SCT, use it to extract valuable lessons for future silicon tracker projects, and give an up-to-date overview of the status and results of the R and D efforts for the ATLAS tracker upgrade.

  16. The ATLAS SCT: Commissioning experience and SLHC upgrade

    International Nuclear Information System (INIS)

    Mitrevski, J.

    2009-01-01

    The ATLAS Semiconductor Tracker (SCT) has been installed, and fully connected to electrical, optical and cooling services. Commissioning has been performed both with calibration data and cosmic ray events. The cosmics were used to align the detector, measure the hit efficiency and set the timing. The SCT is now ready to take data when the LHC turns on this autumn. At the same time, it is clear that the present ATLAS tracker will need to be renewed for projected luminosity upgrade of the LHC, the SLHC. This is mainly driven by occupancy and radiation hardness issues. The new tracker will likely be entirely made of silicon, with the space of the present SCT largely taken up by detectors with much shorter strips. Several large-scale R and D projects on the sensors and module concepts for this upgrade are running, including sensor and module prototyping. We will report upon the commissioning experience from the SCT, use it to extract valuable lessons for future silicon tracker projects, and give an up-to-date overview of the status and results of the R and D efforts for the ATLAS tracker upgrade.

  17. The Complexities of Digital Storytelling: Factors Affecting Performance, Production, and Project Completion

    Science.gov (United States)

    Gobel, Peter; Kano, Makimi

    2016-01-01

    Digital storytelling projects provide a variety of opportunities for learning in the language classroom, but along with these opportunities come a number of challenges for both pedagogy and technology. This presentation describes an ongoing multi-method study into factors involved in task-based learning using digital storytelling. Using intact…

  18. Getting Digital Assets from Public-Private Partnership Research Projects through "The Valley of Death," and Making Them Sustainable.

    Science.gov (United States)

    Aartsen, Wendy; Peeters, Paul; Wagers, Scott; Williams-Jones, Bryn

    2018-01-01

    Projects in public-private partnerships, such as the Innovative Medicines Initiative (IMI), produce data services and platforms (digital assets) to help support the use of medical research data and IT tools. Maintaining these assets beyond the funding period of a project can be a challenge. The reason for that is the need to develop a business model that integrates the perspectives of all different stakeholders involved in the project, and these digital assets might not necessarily be addressing a problem for which there is an addressable market of paying customers. In this manuscript, we review four IMI projects and the digital assets they produced as a means of illustrating the challenges in making digital assets sustainable and the lessons learned. To progress digital assets beyond proof-of-concept into widely adopted tools, there is a need for continuation of multi-stakeholder support tailored to these assets. This would be best done by implementing a structure similar to the accelerators that are in place to help transform startup businesses into growing and thriving businesses. The aim of this article is to highlight the risk of digital asset loss and to provoke discussion on the concept of developing an "accelerator" for digital assets from public-private partnership research projects to increase the chance that digital assets will be sustained and continue to add value long after a project has ended.

  19. Practical experience with digital I and C retrofit projects gathered by independent experts

    International Nuclear Information System (INIS)

    Zeck, Kurt; Schildheuer, Reinhard; Weich, Alfred

    2005-01-01

    As independent experts, we have accompanied a series of major projects where plant control systems have been retrofitted with digital I and C technology. As General Expert Inspectors of our authority, we have investigated, inspected and certified such projects - from defining the tasks at hand trough planning, approving, implementing and commissioning down to the regular operation of the equipment. Our special focus has been on the proper adherence to the relevant safety issues in nuclear plants in accordance with the current state-of-the-art in science and technology, and to the applicable codes of practice. In September 2004, at the international 'Nuclear Plant Instrumentation, Control and Human Machine Interface Technology' meeting in Columbus/Ohio, we presented some major retrofit projects and reported about how we, as independent official experts, accompany and monitor the activities of retrofitting plants with advanced digital safety I and C equipment, from the safety point of view. With current report, we would like to provide more detailed information about the practical experience gained with digital safety I and C retrofits and the conclusions drawn for currently ongoing retrofit projects. We will look at both the technical and licensing aspects of implementing such projects

  20. PROJECT ANQA: DIGITIZING AND DOCUMENTING CULTURAL HERITAGE IN THE MIDDLE EAST

    Directory of Open Access Journals (Sweden)

    S. Akhtar

    2017-08-01

    Full Text Available The practice of digitizing cultural heritage sites is gaining ground among conservation scientists and scholars in architecture, art history, computer science, and related fields. Recently, the location of such sites in areas of intense conflict has highlighted the urgent need for documenting cultural heritage for the purposes of preservation and posterity. The complex histories of such sites requires more than just their digitization, and should also include the meaningful interpretation of buildings and their surroundings with respect to context and intangible values. Project Anqa is an interdisciplinary and multi-partner effort that goes beyond simple digitization to record at-risk heritage sites throughout the Middle East and Saharan Africa, most notably in Syria and Iraq, before they are altered or destroyed. Through a collaborative process, Anqa assembles documentation, historically contextualizes it, and makes data accessible and useful for scholars, peers, and the wider public through state-of-the-art tools. The aim of the project is to engage in capacity-building on the ground in Syria and Iraq, as well as to create an educational web platform that informs viewers about cultural heritage in the region through research, digital storytelling, and the experience of virtual environments.

  1. Project Anqa: Digitizing and Documenting Cultural Heritage in the Middle East

    Science.gov (United States)

    Akhtar, S.; Akoglu, G.; Simon, S.; Rushmeier, H.

    2017-08-01

    The practice of digitizing cultural heritage sites is gaining ground among conservation scientists and scholars in architecture, art history, computer science, and related fields. Recently, the location of such sites in areas of intense conflict has highlighted the urgent need for documenting cultural heritage for the purposes of preservation and posterity. The complex histories of such sites requires more than just their digitization, and should also include the meaningful interpretation of buildings and their surroundings with respect to context and intangible values. Project Anqa is an interdisciplinary and multi-partner effort that goes beyond simple digitization to record at-risk heritage sites throughout the Middle East and Saharan Africa, most notably in Syria and Iraq, before they are altered or destroyed. Through a collaborative process, Anqa assembles documentation, historically contextualizes it, and makes data accessible and useful for scholars, peers, and the wider public through state-of-the-art tools. The aim of the project is to engage in capacity-building on the ground in Syria and Iraq, as well as to create an educational web platform that informs viewers about cultural heritage in the region through research, digital storytelling, and the experience of virtual environments.

  2. Environmental upgrading of a landfill

    International Nuclear Information System (INIS)

    Agostinetto, V.; Vendrame, G.

    1999-01-01

    This article refers to an experimental study concerning the vegetative upgrading of a closed-down landfill (once used for industrial waste disposal). The aim was to check the possibility of reconstructing or aiding the natural growth of a vegetation in keeping with the surrounding area, in a tried environment such as that of landfills. The original idea contained in the approved project - which meant to generically upgrade the territory by planting species belonging to the grassy layer, shrubs and trees - has, with time, undergone some changes. On the basis of both the knowledge acquired during management and of a more accurate analysis of the territory, the experiment was preferred to aim at finding out which were the species, both continental and Mediterranean, able to gradually adjust to the surrounding landscape, leaving to natural selection the task to decide which species were more suitable to the upgrading of closed-down landfills, and which planting technique was more effective [it

  3. Scenarios for the LHC Upgrade

    CERN Document Server

    Scandale, Walter

    2008-01-01

    The projected lifetime of the LHC low-beta quadrupoles, the evolution of the statistical error halving time, and the physics potential all call for an LHC luminosity upgrade by the middle of the coming decade. In the framework of the CARE-HHH network three principal scenarios have been developed for increasing the LHC peak luminosity by more than a factor of 10, to values above 1035 cm−2s−1. All scenarios imply a rebuilding of the high-luminosity interaction regions (IRs) in combination with a consistent change of beam parameters. However, their respective features, bunch structures, IR layouts, merits and challenges, and luminosity variation with β∗ differ substantially. In all scenarios luminosity leveling during a store would be advantageous for the physics experiments. An injector upgrade must complement the upgrade measures in the LHC proper in order to provide the beam intensity and brightness needed as well as to reduce the LHC turnaround time for higher integrated luminosity.

  4. Hydrogen assisted biological biogas upgrading

    DEFF Research Database (Denmark)

    Bassani, Ilaria

    Wind and biomass are promoted worldwide as sustainable forms of energy. Anaerobic digestion of biomass produces biogas with ∼50−70% CH4 and 30−50% CO2. However, biogas with >90% CH4 content has higher heating value, can be injected into the natural gas grid or used as alternative to natural gas...... as vehicle fuel. Methods currently available for biogas upgrading mainly consists of physicochemical CO2 removal, requiring the use of chemical substances and energy input and, thus, increasing process costs. This PhD project proposes an alternative to existing biogas upgrading technologies, where H2......, produced by water electrolysis, using excess of electricity from wind mills, is coupled with the CO2 contained in the biogas to convert them to CH4. This process is defined as biological biogas upgrading and is carried out by hydrogenotrophic methanogenic archaea that couples CO2 with H2 to produce...

  5. ATLAS Tile Calorimeter Readout Electronics Upgrade Program for the High Luminosity LHC

    CERN Document Server

    Cerqueira, A S

    2013-01-01

    The Tile Calorimeter (TileCal) is the hadronic calorimeter covering the most central region of the ATLAS experiment at LHC. The TileCal readout consists of about 10000 channels. The ATLAS upgrade program is divided in three phases: The Phase~0 occurs during 2013-2014, Phase~1 during 2018-1019 and finally Phase~2, which is foreseen for 2022-2023, whereafter the peak luminosity will reach 5-7 x 10$^{34}$ cm$^2$s$^{-1}$ (HL-LHC). The main TileCal upgrade is focused on the Phase~2 period. The upgrade aims at replacing the majority of the on- and off-detector electronics so that all calorimeter signals are directly digitized and sent to the off-detector electronics in the counting room. All new electronics must be able to cope with the increased radiation levels. An ambitious upgrade development program is pursued to study different electronics options. Three options are presently being investigated for the front-end electronic upgrade. The first option is an improved version of the present system built using comm...

  6. Upgrading of analogue gamma cameras with PC based computer system

    International Nuclear Information System (INIS)

    Fidler, V.; Prepadnik, M.

    2002-01-01

    Full text: Dedicated nuclear medicine computers for acquisition and processing of images from analogue gamma cameras in developing countries are in many cases faulty and technologically obsolete. The aim of the upgrading project of International Atomic Energy Agency (IAEA) was to support the development of the PC based computer system which would cost 5.000 $ in total. Several research institutions from different countries (China, Cuba, India and Slovenia) were financially supported in this development. The basic demands for the system were: one acquisition card an ISA bus, image resolution up to 256x256, SVGA graphics, low count loss at high count rates, standard acquisition and clinical protocols incorporated in PIP (Portable Image Processing), on-line energy and uniformity correction, graphic printing and networking. The most functionally stable acquisition system tested on several international workshops and university clinics was the Slovenian one with a complete set of acquisition and clinical protocols, transfer of scintigraphic data from acquisition card to PC through PORT, count loss less than 1 % at count rate of 120 kc/s, improvement of integral uniformity index by a factor of 3-5 times, reporting, networking and archiving solutions for simple MS network or server oriented network systems (NT server, etc). More than 300 gamma cameras in 52 countries were digitized and put in the routine work. The project of upgrading the analogue gamma cameras yielded a high promotion of nuclear medicine in the developing countries by replacing the old computer systems, improving the technological knowledge of end users on workshops and training courses and lowering the maintenance cost of the departments. (author)

  7. The ESPRIT project CAFE : high security digital payment systems

    NARCIS (Netherlands)

    Boly, J.P.; Bosselaers, A.; Cramer, R.; Michelsen, R.; Mjølsnes, S.F.; Muller, F.; Pedersen, T.P.; Pfitzmann, B.; Rooij, de P.; Schoenmakers, B.; Schunter, M.; Vallée, L.; Waidner, M.; Gollmann, D.

    1994-01-01

    CAFE (“Conditional Access for Europe”) is an ongoing project in the European Community's ESPRIT program. The goal of CAFE is to develop innovative systems for conditional access, and in particular, digital payment systems. An important aspect of CAFE is high security of all parties concerned, with

  8. Reproduction of the Yucca Mountain Project TSPA-LA Uncertainty and Sensitivity Analyses and Preliminary Upgrade of Models

    Energy Technology Data Exchange (ETDEWEB)

    Hadgu, Teklu [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Nuclear Waste Disposal Research and Analysis; Appel, Gordon John [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Nuclear Waste Disposal Research and Analysis

    2016-09-01

    Sandia National Laboratories (SNL) continued evaluation of total system performance assessment (TSPA) computing systems for the previously considered Yucca Mountain Project (YMP). This was done to maintain the operational readiness of the computing infrastructure (computer hardware and software) and knowledge capability for total system performance assessment (TSPA) type analysis, as directed by the National Nuclear Security Administration (NNSA), DOE 2010. This work is a continuation of the ongoing readiness evaluation reported in Lee and Hadgu (2014) and Hadgu et al. (2015). The TSPA computing hardware (CL2014) and storage system described in Hadgu et al. (2015) were used for the current analysis. One floating license of GoldSim with Versions 9.60.300, 10.5 and 11.1.6 was installed on the cluster head node, and its distributed processing capability was mapped on the cluster processors. Other supporting software were tested and installed to support the TSPA-type analysis on the server cluster. The current tasks included verification of the TSPA-LA uncertainty and sensitivity analyses, and preliminary upgrade of the TSPA-LA from Version 9.60.300 to the latest version 11.1. All the TSPA-LA uncertainty and sensitivity analyses modeling cases were successfully tested and verified for the model reproducibility on the upgraded 2014 server cluster (CL2014). The uncertainty and sensitivity analyses used TSPA-LA modeling cases output generated in FY15 based on GoldSim Version 9.60.300 documented in Hadgu et al. (2015). The model upgrade task successfully converted the Nominal Modeling case to GoldSim Version 11.1. Upgrade of the remaining of the modeling cases and distributed processing tasks will continue. The 2014 server cluster and supporting software systems are fully operational to support TSPA-LA type analysis.

  9. Trends in digital I and C for nuclear power plants

    International Nuclear Information System (INIS)

    Cook, B.M.

    2000-01-01

    Over the past decade, large-scale digital I and C systems have been installed on nuclear power plants as the original systems for plant operations. Examples of these include Sizewell B in the United Kingdom and Temelin NPP in the Czech Republic. Now, this digital technology is being used for replacement and upgrade systems such as those for Ringhals Unit 2 in Sweden and the Kewaunee plant in the United States. Such a digital upgrade is being planned for the Dukovany NPP in the Czech Republic. As the experience base grows with this digital technology on nuclear power plants, certain trends are developing in the application practices and licensing of these systems. This paper discusses these trends and suggests adaptations that may become necessary in the classical roles of vendors, regulators and plant operators. (author)

  10. Alaska Seismic Network Upgrade and Expansion

    Science.gov (United States)

    Sandru, J. M.; Hansen, R. A.; Estes, S. A.; Fowler, M.

    2009-12-01

    AEIC (Alaska Earthquake Information Center) has begun the task of upgrading the older regional seismic monitoring sites that have been in place for a number of years. Many of the original sites (some dating to the 1960's) are still single component analog technology. This was a very reasonable and ultra low power reliable system for its day. However with the advanced needs of today's research community, AEIC has begun upgrading to Broadband and Strong Motion Seismometers, 24 bit digitizers and high-speed two-way communications, while still trying to maintain the utmost reliability and maintaining low power consumption. Many sites have been upgraded or will be upgraded from single component to triaxial broad bands and triaxial accerometers. This provided much greater dynamic range over the older antiquated technology. The challenge is compounded by rapidly changing digital technology. Digitizersand data communications based on analog phone lines utilizing 9600 baud modems and RS232 are becoming increasingly difficult to maintain and increasingly expensive compared to current methods that use Ethernet, TCP/IP and UDP connections. Gaining a reliable Internet connection can be as easy as calling up an ISP and having a DSL connection installed or may require installing our own satellite uplink, where other options don't exist. LANs are accomplished with a variety of communications devices such as spread spectrum 900 MHz radios or VHF radios for long troublesome shots. WANs are accomplished with a much wider variety of equipment. Traditional analog phone lines are being used in some instances, however 56K lines are much more desirable. Cellular data links have become a convenient option in semiurban environments where digital cellular coverage is available. Alaska is slightly behind the curve on cellular technology due to its low population density and vast unpopulated areas but has emerged into this new technology in the last few years. Partnerships with organizations

  11. Research and Development on the Storage Ring Vacuum System for the APS Upgrade Project

    Energy Technology Data Exchange (ETDEWEB)

    Stillwell, B.; Brajuskovic, B.; Carter, J.; Cease, H.; Lill, R.; Navrotski, G.; Noonan, J.; Suthar, K.; Walters, D.; Wiemerslage, G.; Zientek, J.; Sangroula, M.

    2016-01-01

    A number of research and development activities are underway at Argonne National Laboratory to build confidence in the designs for the storage ring vacuum system required for the Advanced Photon Source Up-grade project (APS-U) [1]. The predominant technical risks are: excessive residual gas pressures during operation; insufficient beam position monitor stability; excessive beam impedance; excessive heating by induced electrical surface currents; and insufficient operational reliability. Present efforts to mitigate these risks include: building and evaluating mockup assemblies; performing mechanical testing of chamber weld joints; developing computational tools; investigating design alternatives; and performing electrical bench measurements. Status of these activities and some of what has been learned to date will be shared.

  12. Instrument hardware and software upgrades at IPNS

    International Nuclear Information System (INIS)

    Worlton, Thomas; Hammonds, John; Mikkelson, D.; Mikkelson, Ruth; Porter, Rodney; Tao, Julian; Chatterjee, Alok

    2006-01-01

    IPNS is in the process of upgrading their time-of-flight neutron scattering instruments with improved hardware and software. The hardware upgrades include replacing old VAX Qbus and Multibus-based data acquisition systems with new systems based on VXI and VME. Hardware upgrades also include expanded detector banks and new detector electronics. Old VAX Fortran-based data acquisition and analysis software is being replaced with new software as part of the ISAW project. ISAW is written in Java for ease of development and portability, and is now used routinely for data visualization, reduction, and analysis on all upgraded instruments. ISAW provides the ability to process and visualize the data from thousands of detector pixels, each having thousands of time channels. These operations can be done interactively through a familiar graphical user interface or automatically through simple scripts. Scripts and operators provided by end users are automatically included in the ISAW menu structure, along with those distributed with ISAW, when the application is started

  13. Metadata, Cataloging, Digitization and Retrieval--Who's Doing What to Whom: The Colorado Digitization Project Experience.

    Science.gov (United States)

    Bishoff, Liz; Garrison, William A.

    This paper describes the experiences of the Colorado Digitization Project (CDP) related to accessing a diverse set of primary resources held by many different cultural heritage institutions. The CDP is a collaborative initiative involving Colorado's archives, historical societies, libraries, and museums. The CDP's goal is to create a virtual…

  14. Test Beam Studies for the ATLAS Tile Calorimeter Upgrade Readout Electronics

    CERN Document Server

    Schaefer, Douglas; The ATLAS collaboration

    2018-01-01

    The High Luminosity Large Hadron Collider is expected to deliver 3-4/ab of p-p collisions with around 200 collisions per proton bunch crossing starting in 2026, and the readout electronics of the ATLAS Tile Calorimeter need to be upgraded to deal with the high rate of data taking as well as the large pileup conditions. The proposed digitizer/shaper cards were tested in 2016-7 in the North Area at CERN using the beam from the SPS to produce high energy pions, electrons, muons, and kaons. This presentation summarizes the setup for particle identification and study of the ATLAS Tile Calorimeter data taking in preparation for the production of main boards and digitizer/shaper boards for the photo-multiplier tubes. The fully assembled and tested mini-drawers will start to be installed after the LHC long shutdown in December 2023. The pulse shape, uniformity, and timing precision of the upgrade system are demonstrated.

  15. The PreProcessors for the ATLAS Tile Calorimeter Phase II Upgrade

    CERN Document Server

    Carrio Argos, Fernando; The ATLAS collaboration

    2015-01-01

    The Large Hadron Collider (LHC) has envisaged a series of upgrades towards a High Luminosity LHC (HL-LHC) delivering five times the LHC nominal instantaneous luminosity. The ATLAS Phase II upgrade will accommodate the detector and data acquisition system for the HL-LHC. In particular, the Tile Hadronic Calorimeter (TileCal) will replace completely on- and off-detector electronics using a new read-out architecture. The digitized detector data will be transferred for every beam crossing to the super Read Out Drivers (sRODs) located in off-detector counting rooms with a total data bandwidth of roughly 80 Tbps. The sROD implements increased pipelines memories and must provide pre-processed digital trigger information to Level 0/1 systems. The sROD module represents the link between the on-detector electronics and the overall ATLAS data acquisition system. It also implements the interface between the Detector Control System (DCS) and the on-detector electronics which is used to control and monitor the high voltage...

  16. Learning and digital inclusion: the ELAMP project

    Directory of Open Access Journals (Sweden)

    Kate D'Arcy

    2012-12-01

    Full Text Available The Electronic Learning and Mobility Project (ELAMP was a nationally funded project by the Department for Children, Schools and Families, which ran from 2004 to 2010. The main aim of ELAMP was to improve the education of Traveller children, particularly highly mobile learners. ELAMP focussed upon the use of mobile technology and distance learning to support, enhance and extend young Travellers’ educational and vocational opportunities. This article will reflect upon the learning and technological experiences and opportunities that the ELAMP project provided for Traveller children, young people and their families. In doing so it will critically consider the value of information technology in working with Traveller communities and advancing their educational opportunities. Reviewing ELAMP work will also demonstrate how the use of mobile technology can improve educational outcomes and Traveller families’ digital inclusion. Now that the project has ended, this article will question why we are not using what we learnt from ELAMP to move forward. The author was a tutor on the project who also evaluated the Strand B, Wider Key Skills element of ELAMP for The University of Sheffield between 2008 and 2010, which is the main focus of this particular article.

  17. Upgrading across Organisational and Geographical Configurations : Analysis of the Chinese Automotive Industry

    NARCIS (Netherlands)

    E. van Tuijl (Erwin)

    2015-01-01

    markdownabstract__Abstract__ This thesis deals with upgrading: a process of learning and knowledge sourcing in order to generate value added. We analyse how upgrading takes place across various organisational configurations: formal collaboration, clusters, projects, and events. Moreover, we

  18. Future of the CMS Muon System Upgrades and Aging

    CERN Document Server

    Pilot, Justin Robert

    2016-01-01

    The CMS detector currently includes three different muon detector types drift tubes (DT) in the central region, cathode strip chambers (CSC) in the forward regions, and resistive plate chambers (RPC) in both the forward and central regions. Several upgrade projects are planned to maintain high data-taking efficiency with the planned running conditions for the high-luminosity upgrade of the LHC. These upgrades are designed to ensure detector longevity and increase redundancy, while mitigating rate increases and retaining sensitivity to phyics processes. This involves changes to electronics and infrastructure of existing detectors, and adding new detectors in the forward region of the CMS experiment. Plans for each of the muon subsystems are described here in the context of the Phase-II upgrade schedule of the CMS experiment.

  19. T Plant secondary containment and leak detection upgrades

    International Nuclear Information System (INIS)

    Carlson, T.A.

    1995-01-01

    The W-259 project will provide upgrades to the 2706-T/TA Facility to comply with Federal and State of Washington environmental regulations for secondary containment and leak detection. The project provides decontamination activities supporting the environmental restoration mission and waste management operations on the Hanford Site

  20. LS1: electrical engineering upgrades and consolidation

    International Nuclear Information System (INIS)

    Duval, F.

    2012-01-01

    3 different types of activities are planned by the Engineering Department Electrical Engineering (EN-EL) Group for the first long shut down (LS1). First, the consolidation of EN-EL's ageing infrastructure elements. It is part of a 15- year programme aiming at increasing the reliability and availability of the power distribution network. Secondly, the maintenance of the accelerators infrastructure. In addition to the usual periodic operations and those delayed until LS1, the group will address more demanding activities like the replacement campaigns for irradiated cables and non-radiation resistant fibres as well as the removal of unused cables in particularly overcrowded areas. Thirdly, a vast amount of user copper and optical fibre cabling requests: EN-EL estimates that only 50% of LS1 requests are currently known. The main activities will be EN-EL's contributions to the R2E project, BE-BI upgrade projects, and the RF upgrade project in SPS BA3

  1. The Phase-I Trigger Readout Electronics Upgrade for the ATLAS Liquid-Argon Calorimeters

    CERN Document Server

    Ochoa, Ines; The ATLAS collaboration

    2017-01-01

    Electronics developments are pursued for the trigger readout of the ATLAS Liquid-Argon Calorimeter towards the Phase-I upgrade scheduled in the LHC shut-down period of 2019-2020. The LAr Trigger Digitizer system will digitize 34000 channels at a 40 MHz sampling with 12 bit precision after the bipolar shaper at the front-end system, and transmit to the LAr Digital Processing system in the back-end to extract the transverse energies. Results of ASIC developments including QA and radiation hardness evaluations, and performances on prototypes will presented with the overall system design.

  2. Scientific upgrades at the high flux isotope reactor at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Selby, D.L.; Garrett, D.L.; Lucas, A.T.; Reeves, M.E.

    2001-01-01

    The United States Department of Energy is sponsoring a number of projects that will provide scientific upgrades to the neutron science facilities associated with the high flux isotope reactor (HFIR) located at Oak Ridge National Laboratory. Funding for the first upgrade project was initiated in 1996 and all presently identified upgrade projects are expected to be completed by the end of 2003. The upgrade projects include: 1) larger beam tubes, 2) a new monochromator drum for the HB-1 beam line, 3) a new HB-2 beam line system that includes one thermal guide and a new monochromator drum, 4) new instruments for the HB-2 beamline, 5) a new monochromator drum for the HB-3 beam line, 6) a supercritical hydrogen cold source system to be retrofitted into the HB-4 beam tube, 7) a 3.5 kW refrigeration system at 20 K to support the cold source and a new building to house it, 8) a new HB-4 beam line system composed of four cold neutron guides with various mirror coatings and associated shielding, 9) a number of new instruments for the cold beams including two new SANS instruments, and 10) construction of support buildings. This paper provides a short summary of these projects including their present status and schedule. (orig.)

  3. Light Water Reactor Sustainability Program: Digital Architecture Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Thomas, Ken [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-09-01

    There are many technologies available to the nuclear power industry to improve efficiency in plant work activities. These range from new control room technologies to those for mobile field workers. They can make a positive impact on a wide range of performance objectives – increase in productivity, human error reduction, validation of results, accurate transfer of data, and elimination of repetitive tasks. It is expected that the industry will more and more turn to these technologies to achieve these operational efficiencies to lower costs. At the same time, this will help utilities manage a looming staffing problem as the inevitable retirement wave of the more seasoned workers affects both staffing levels and knowledge retention. A barrier to this wide-scale implementation of new technologies for operational efficiency is the lack of a comprehensive digital architecture that can support the real-time information exchanges needed to achieve the desired operational efficiencies. This project will define an advanced digital architecture that will accommodate the entire range of system, process, and plant worker activity to enable the highest degree of integration, thereby creating maximum efficiency and productivity. This pilot project will consider a range of open standards that are suitable for the various data and communication requirements of a seamless digital environment. It will map these standards into an overall architecture to support the II&C developments of this research program.

  4. Upgrading of radon's type near surface repository in Latvia

    International Nuclear Information System (INIS)

    Abramenkovs, A.

    2006-01-01

    In 1959, the Soviet government decided to construct the near surface radioactive wastes repository 'Radons' near the Baldone city. It was put in operation in 1962. The changes in the development of the repository were induced by the necessarily to upgrade it for disposal of radioactive wastes from the decommissioning of the Salaspils Research Reactor (SRR). The safety assessment of repository was performed during 2000-2001 under the PHARE project for necessary upgrades of repository. The outline design for new vaults and interim storage for long lived radioactive wastes was elaborated during 2003-2004 years. The Environmental Impact Assessment (EIA) for upgrade of Baldone repository was performed during 2004-2005 years. It was found, that additional efforts must be devoted for solution of social aspects o for successful operation and upgrade of repository. It was shown by EIA, that the local population has a negative opinion against the upgrade of repository in Latvia. The main recommendations for upgrades were connected with increasing the safety of repository, increasing of PR activities for education of society and developing of compensation mechanism for local municipality. (author)

  5. Modernization and power upgrading of the Loviisa NPP

    Energy Technology Data Exchange (ETDEWEB)

    Keskinen, A. [IVO Power Engineering Ltd., Vantaa (Finland)

    1997-12-31

    In 1995, Imatran Voima Oy (IVO) started a project for modernization and power upgrading of the Loviisa NPP. The main objectives of the project are to ensure plant safety, to increase electricity production and to improve the expertise of the IVO staff. The total electricity output of Loviisa 1 and 2 units is planned to be increased by about 100 MW. This will be achieved through renovation of the steam turbines and through gradual increase in the thermal reactor power up to 1,500 MW from the present level of 1,375 MW. The Loviisa NPP Final Safety Analysis Report has been revised to a great extent in connection with the licensing process of the reactor power upgrading. The project also includes certain improvements in the primary and safety systems to ensure plant safety. The total cost estimate of the project is around 200 million FIM. The project implementation started in 1995 and in accordance with the plans in 2000 after several phases the last measures at power plant will be completed. (orig.). 4 refs.

  6. Modernization and power upgrading of the Loviisa NPP

    International Nuclear Information System (INIS)

    Keskinen, A.

    1997-01-01

    In 1995, Imatran Voima Oy (IVO) started a project for modernization and power upgrading of the Loviisa NPP. The main objectives of the project are to ensure plant safety, to increase electricity production and to improve the expertise of the IVO staff. The total electricity output of Loviisa 1 and 2 units is planned to be increased by about 100 MW. This will be achieved through renovation of the steam turbines and through gradual increase in the thermal reactor power up to 1,500 MW from the present level of 1,375 MW. The Loviisa NPP Final Safety Analysis Report has been revised to a great extent in connection with the licensing process of the reactor power upgrading. The project also includes certain improvements in the primary and safety systems to ensure plant safety. The total cost estimate of the project is around 200 million FIM. The project implementation started in 1995 and in accordance with the plans in 2000 after several phases the last measures at power plant will be completed. (orig.)

  7. Modernization and power upgrading of the Loviisa NPP

    Energy Technology Data Exchange (ETDEWEB)

    Keskinen, A [IVO Power Engineering Ltd., Vantaa (Finland)

    1998-12-31

    In 1995, Imatran Voima Oy (IVO) started a project for modernization and power upgrading of the Loviisa NPP. The main objectives of the project are to ensure plant safety, to increase electricity production and to improve the expertise of the IVO staff. The total electricity output of Loviisa 1 and 2 units is planned to be increased by about 100 MW. This will be achieved through renovation of the steam turbines and through gradual increase in the thermal reactor power up to 1,500 MW from the present level of 1,375 MW. The Loviisa NPP Final Safety Analysis Report has been revised to a great extent in connection with the licensing process of the reactor power upgrading. The project also includes certain improvements in the primary and safety systems to ensure plant safety. The total cost estimate of the project is around 200 million FIM. The project implementation started in 1995 and in accordance with the plans in 2000 after several phases the last measures at power plant will be completed. (orig.). 4 refs.

  8. Dagik Earth: A Digital Globe Project for Classrooms, Science Museums, and Research Institutes

    Science.gov (United States)

    Saito, A.; Tsugawa, T.

    2017-12-01

    Digital globe system is a powerful tool to make the audiences understand phenomena on the Earth and planets in intuitive way. Geo-cosmos of Miraikan, Japan uses 6-m spherical LED, and is one of the largest systems of digital globe. Science on a Sphere (SOS) by NOAA is a digital globe system that is most widely used in science museums around the world. These systems are so expensive that the usage of the digital globes is mainly limited to large-scale science museums. Dagik Earth is a digital globe project that promotes educational programs using digital globe with low cost. It aims to be used especially in classrooms. The cost for the digital globe of Dagik Earth is from several US dollars if PC and PC projector are available. It uses white spheres, such as balloons and balance balls, as the screen. The software is provided by the project with free of charge for the educational usage. The software runs on devices of Windows, Mac and iOS. There are English and Chinese language versions of the PC software besides Japanese version. The number of the registered users of Dagik Earth is about 1,400 in Japan. About 60% of them belongs to schools, 30% to universities and research institutes, and 8% to science museums. In schools, it is used in classes by teachers, and science activities by students. Several teachers have used the system for five years and more. In a students' activity, Dagik Earth contents on the typhoon, solar eclipse, and satellite launch were created and presented in a school festival. This is a good example of the usage of Dagik Earth for STEM education. In the presentation, the system and activity of Dagik Earth will be presented, and the future expansion of the project will be discussed.

  9. Seismic review of vault for MFTF upgrade project

    International Nuclear Information System (INIS)

    Franklin, H.A.

    1983-01-01

    This letter report was prepared in accordance with the scope of work for the preconceptual seismic evaluation of the (α + T) Tandem Mirror Fusion Machine concrete vault. The scope of the work was developed with the assistance of the Bechtel site representative Dr. Sunil Ghose. The report contains comments and preconceptual recommendations on wall upgrading for an 150-ton crane installation, concrete vault seismic capability for (α + T) conditions, and recommendations for future work

  10. Biogas upgrading to biomethane. Proceedings; Biogasaufbereitung zu Biomethan. Tagungsband

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-12-05

    Within the 6th Hanauer Dialogue 'Biogas upgrading to biomethane' at 21st February, 2008, the following lectures were held: (a) Processing of biogas - an introduction (Michael Beil); (b) The climate protecting targets of the Federal Republic of Germany: Which role will play the upgrading of biogas, and which legal boundary conditions are created by the Federal Government? (Uwe Holzhammer); (c) Future strategy: CH{sub 4} grids (Juergen Schmid); (d) Biogas upgrading and biomethane utilization in Sweden (Anneli Petersson); (e) Biogas upgrading and utilization of bio methane in Switzerland (Arthur Wellinger); (f) Biogas upgrading by means of pressure swing adsorption (Alfons Schulte-Schulze Berndt); (g) Biogas upgrading by means of pressurized water washing (Ulf Richter); (h) Biogas upgrading for feeding in public grids. The case of biogas plant Bruck a.d. Leitha (Michael Harasek); (i) Biogas upgrading by means of chemical absorption according to the LP Cooab process (Jerome van Beek); (j) Practical experiences in unpressurized amine washing MT bio methane (Karsten Wuensche); (k) Biogas upgrading by means of organic physical washing with HAASE biogas amplifiers (Roland Kahn); (l) Upgrading using cryogenic technology; the GPP registered -system (Jeroen de Pater); (m) Micro Gas Distribution Systems: Alternatives to biogas upgrading and grid injection (Michael Beil, Bernd Krautkremer); (n) Feeding of exchange gas. The case of project Straelen and Kerpen (Frank Schaefer); (o) Feeding of biogas from the view of grid operators (Norbert Nordmeyer); BIOGASMAX: Biogas as Vehicle Fuel - Market Expansion to 2020 Air Quality (Michael Beil, Uwe Hoffstede); (p) Study: Feeding of biogas into the natural gas distribution system (Fachagentur Nachwachsende Rohstoffe).

  11. Software qualification for digital safety system in KNICS project

    International Nuclear Information System (INIS)

    Kwon, Kee-Choon; Lee, Dong-Young; Choi, Jong-Gyun

    2012-01-01

    In order to achieve technical self-reliance in the area of nuclear instrumentation and control, the Korea Nuclear Instrumentation and Control System (KNICS) project had been running for seven years from 2001. The safety-grade Programmable Logic Controller (PLC) and the digital safety system were developed by KNICS project. All the software of the PLC and digital safety system were developed and verified following the software development life cycle Verification and Validation (V and V) procedure. The main activities of the V and V process are preparation of software planning documentations, verification of the Software Requirement Specification (SRS), Software Design Specification (SDS) and codes, and a testing of the software components, the integrated software, and the integrated system. In addition, a software safety analysis and a software configuration management are included in the activities. For the software safety analysis at the SRS and SDS phases, the software Hazard Operability (HAZOP) was performed and then the software fault tree analysis was applied. The software fault tree analysis was applied to a part of software module with some critical defects identified by the software HAZOP in SDS phase. The software configuration management was performed using the in-house tool developed in the KNICS project. (author)

  12. Reflexões sobre o patrimônio digital a partir da experiência do projeto Arquigrafia │ Digital heritage: reflections on the Arquigrafia project

    Directory of Open Access Journals (Sweden)

    Artur Simões Rozestraten

    2015-05-01

    ABSTRACT This paper  proposes a critical reflection on documental and technological challenges regarding conservation, digitization, cataloguing and web dissemination of images in the experience of the Arquigrafia multidisciplinary project (www.arquigrafia.org.br. Arquigrafia is a collaborative web image sharing environment open to photographic institutional archives and users' private collections. The need to organize and share this information set, as well as the specificities of descriptive and thematic representation for effective retrieval of this digital heritage are also presented. Besides the issues issues related to the financing of digitization projects of collections and the preservation of documents and digital files, this article discuss the need to establish a public policy that incorporates the latest standards and the most appropriate methodology for the treatment, organization and retrieval information concerning the digital heritage that has been produced by Brazilian public institutions such as university libraries, archives and museums. Keywords: Image; Digital Heritage; Collaborative Environment; Web.

  13. National Spherical Torus Experiment (NSTX) Center Stack Upgrade

    International Nuclear Information System (INIS)

    Neumeyer, C.; Avasarala, S.; Chrzanowski, J.; Dudek, L.; Fan, H.; Hatcher, H.; Heitzenroeder, P.; Menard, J.; Ono, M.; Ramakrishnan, S.; Titus, P.; Woolley, R.; Zhan, H.

    2009-01-01

    The purpose of the NSTX Center Stack Upgrade project is to expand the NSTX operational space and thereby the physics basis for next-step ST facilities. The plasma aspect ratio (ratio of plasma major to minor radius) of the upgrade is increased to 1.5 from the original value of 1.26, which increases the cross sectional area of the center stack by a factor of ∼ 3 and makes possible higher levels of performance and pulse duration.

  14. MAST Upgrade – Construction Status

    Energy Technology Data Exchange (ETDEWEB)

    Milnes, Joe, E-mail: Joe.Milnes@ccfe.ac.uk; Ayed, Nizar Ben; Dhalla, Fahim; Fishpool, Geoff; Hill, John; Katramados, Ioannis; Martin, Richard; Naylor, Graham; O’Gorman, Tom; Scannell, Rory

    2015-10-15

    Highlights: • Outlines unique capability of MAST-U, including divertor and diagnostic capability. • Describes progress made in the manufacture and assembly of key MAST-U components. • Highlights the design challenges that have been overcome. • Lists the key lessons learned thus far in the project. - Abstract: The Mega Amp Spherical Tokamak (MAST) is the centre piece of the UK fusion research programme. In 2010, a MAST Upgrade programme was initiated with three primary objectives, to contribute to: (1) testing reactor concepts (in particular exhaust solutions via a flexible divertor allowing Super-X and other extended leg configurations); (2) adding to the knowledge base for ITER (by addressing important plasma physics questions and developing predictive models to help optimise ITER performance of ITER) and (3) exploring the feasibility of using a spherical tokamak as the basis for a fusion Component Test Facility. With the project mid-way through its construction phase, progress will be reported on a number of the critical subsystems. This will include manufacture and assembly of the coils, armour and support structures that make up the new divertors, construction of the new set coils that make up the centre column, installation of the new power supplies for powering the divertor coils and enhanced TF coil set, progress in delivering the upgraded diagnostic capability, the modification and upgrading of the NBI heating systems and the complete overhaul of the machine control infrastructure, including a new control room with full remote participation facilities.

  15. ISTTOK control system upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Carvalho, Ivo S., E-mail: ivoc@ipfn.ist.utl.pt; Duarte, Paulo; Fernandes, Horácio; Valcárcel, Daniel F.; Carvalho, Pedro J.; Silva, Carlos; Duarte, André S.; Neto, André; Sousa, Jorge; Batista, António J.N.; Carvalho, Bernardo B.

    2013-10-15

    Highlights: •ISTTOK fast controller. •All real-time diagnostic and actuators were integrated in the control platform. •100 μs control cycle under the MARTe framework. •The ISTTOK control system upgrade provides reliable operation with an improved operational space. -- Abstract: The ISTTOK tokamak (Ip = 4 kA, BT = 0.5 T, R = 0.46 m, a = 0.085 m) is one of the few tokamaks with regular alternate plasma current (AC) discharges scientific programme. In order to improve the discharge stability and to increase the number of AC discharge cycles a novel control system was developed. The controller acquires data from 50 analog-to-digital converter (ADC) channels of real-time diagnostics and measurements: tomography, Mirnov coils, interferometer, electric probes, sine and cosine probes, bolometer, current delivered by the power supplies, loop voltage and plasma current. The system has a control cycle of 100 μs during which it reads all the diagnostics connected to the advanced telecommunications computing architecture (ATCA) digitizers and sends the control reference to ISTTOK actuators. The controller algorithms are executed on an Intel{sup ®} Q8200 chip with 4 cores running at 2.33 GHz and connected to the I/O interfaces through an ATCA based environment. The real-time control system was programmed in C++ on top of the Multi-threaded Application Real-Time executor (MARTe). To extend the duration of the AC discharges and the plasma stability a new magnetising field power supply was commissioned and the horizontal and vertical field power supplies were also upgraded. The new system also features a user-friendly interface based on HyperText Markup Language (HTML) and Javascript to configure the controller parameters. This paper presents the ISTTOK control system and the consequent update of real-time diagnostics and actuators.

  16. ISTTOK control system upgrade

    International Nuclear Information System (INIS)

    Carvalho, Ivo S.; Duarte, Paulo; Fernandes, Horácio; Valcárcel, Daniel F.; Carvalho, Pedro J.; Silva, Carlos; Duarte, André S.; Neto, André; Sousa, Jorge; Batista, António J.N.; Carvalho, Bernardo B.

    2013-01-01

    Highlights: •ISTTOK fast controller. •All real-time diagnostic and actuators were integrated in the control platform. •100 μs control cycle under the MARTe framework. •The ISTTOK control system upgrade provides reliable operation with an improved operational space. -- Abstract: The ISTTOK tokamak (Ip = 4 kA, BT = 0.5 T, R = 0.46 m, a = 0.085 m) is one of the few tokamaks with regular alternate plasma current (AC) discharges scientific programme. In order to improve the discharge stability and to increase the number of AC discharge cycles a novel control system was developed. The controller acquires data from 50 analog-to-digital converter (ADC) channels of real-time diagnostics and measurements: tomography, Mirnov coils, interferometer, electric probes, sine and cosine probes, bolometer, current delivered by the power supplies, loop voltage and plasma current. The system has a control cycle of 100 μs during which it reads all the diagnostics connected to the advanced telecommunications computing architecture (ATCA) digitizers and sends the control reference to ISTTOK actuators. The controller algorithms are executed on an Intel ® Q8200 chip with 4 cores running at 2.33 GHz and connected to the I/O interfaces through an ATCA based environment. The real-time control system was programmed in C++ on top of the Multi-threaded Application Real-Time executor (MARTe). To extend the duration of the AC discharges and the plasma stability a new magnetising field power supply was commissioned and the horizontal and vertical field power supplies were also upgraded. The new system also features a user-friendly interface based on HyperText Markup Language (HTML) and Javascript to configure the controller parameters. This paper presents the ISTTOK control system and the consequent update of real-time diagnostics and actuators

  17. Poster presented at Research Bazaar 2015 - project and digital tools overview

    OpenAIRE

    Strack, Michael

    2015-01-01

    Poster presented at the Research Bazaar 2015 at Melbourne University, Australia. Conference attendees were asked to share an overview of their project and the digital platforms they used in their research.

  18. VISIR upgrade overview and status

    Science.gov (United States)

    Kerber, Florian; Käufl, Hans Ulrich; Baksai, Pedro; Dobrzycka, Danuta; Finger, Gert; Ives, Derek; Jakob, Gerd; Lagadec, Eric; Lundin, Lars; Mawet, Dimitri; Mehrgan, Leander; Moerchen, Margaret; Momany, Yazan; Moreau, Vincent; Pantin, Eric; Riquelme, Miguel; Siebenmorgen, Ralf; Silber, Armin; Smette, Alain; Taylor, Julian; van den Ancker, Mario; Venema, Lars; Weilenmann, Ueli; Yegorova, Irina

    2012-09-01

    We present an overview of the VISIR upgrade project. VISIR is the mid-infrared imager and spectrograph at ESO's VLT. The project team is comprised of ESO staff and members of the original VISIR consortium: CEA Saclay and ASTRON. The project plan is based on input from the ESO user community with the goal of enhancing the scientific performance and efficiency of VISIR by a combination of measures: installation of improved hardware, optimization of instrument operations and software support. The cornerstone of the upgrade is the 1k by 1k Si:As Aquarius detector array (Raytheon) which has demonstrated very good performance (sensitivity, stability) in the laboratory IR detector test facility (modified TIMMI 2 instrument). A prism spectroscopic mode will cover the N-band in a single observation. New scientific capabilities for high resolution and high-contrast imaging will be offered by sub-aperture mask (SAM) and phase-mask coronagraphic (4QPM/AGPM) modes. In order to make optimal use of favourable atmospheric conditions a water vapour monitor has been deployed on Paranal, allowing for real-time decisions and the introduction of a userdefined constraint on water vapour. Improved pipelines based on the ESO Reflex concept will provide better support to astronomers. The upgraded VISIR will be a powerful instrument providing background limited performance for diffraction-limited observations at an 8-m telescope. It will offer synergy with facilities such as ALMA, JWST, VLTI and SOFIA, while a wealth of targets is available from survey work (e.g. VISTA, WISE). In addition it will bring confirmation of the technical readiness and scientific value of several aspects of potential mid-IR instrumentation at Extremely Large Telescopes. The intervention on VISIR and installation of hardware has been completed in July and commissioning will take place during July and August. VISIR is scheduled to be available to the users starting Oct 2012.

  19. European dimension of the implementation of the IAEA TC model project 'Upgrading radiation protection infrastructure'

    International Nuclear Information System (INIS)

    Sabol, J.

    2001-01-01

    A comprehensive evaluation carried out by the IAEA during the period 1984-1995 showed that eleven countries in Europe -- Albania, Armenia, Belarus, Bosnia and Herzegovina, Cyprus, Estonia, Georgia, Latvia, Lithuania, the Republic of Moldova, The Former Yugoslav Republic (TFYR) of Macedonia -- did not have a satisfactory system for radiation protection and the safety of radiation sources in accordance with the recommended international requirements. During the past four years, these countries have been participating in a Model Project aimed at upgrading radiation protection infrastructure in the Europe region with special emphasis on the establishment of an effective legal framework for adequate regulatory control of radiation sources and facilities. This paper analyses the results accomplished in the implementation of this project. It presents the main objectives, based on the present achievements for a follow-up programme to be carried out in participating and also in some other Member States with insufficient national infrastructures for assuring adequate safety in nuclear and radiation technologies. (author)

  20. Marys Lake 69/115-kV transmission line upgrade and substation expansion projects

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-05-01

    Western Area Power Administration (Western) and the Platte River Power Authority (Platte River) propose to upgrade portions of the existing electric transmission and substation system that serves the Town of Estes Park, Colorado. The existing transmission lines between the Estes Power Plant Switchyard and the Marys Lake Substation include a 115,000 volt (115-kV) line and 69,000 volt (69-kV) line. Approximately one mile is a double-circuit 115/69-kV line on steel lattice structures, and approximately two miles consists of separate single-circuit 115-kV and a 69-kV lines, constructed on wood H-Frame structures. Both lines were constructed in 1951 by the US Bureau of Reclamation. The existing transmission lines are on rights-of-way (ROW) that vary from 75 feet to 120 feet and are owned by Western. There are 48 landowners adjacent to the existing ROW. All of the houses were built adjacent to the existing ROW after the transmission lines were constructed. Upgrading the existing 69-kV transmission line between the Marys Lake Substation and the Estes Power Plant Switchyard to 115-kV and expanding the Marys Lake Substation was identified as the most effective way in which to improve electric service to Estes Park. The primary purpose and need of the proposed project is to improve the reliability of electric service to the Town of Estes Park. Lack of reliability has been a historical concern, and reliability will always be less than desired until physical improvements are made to the electrical facilities serving Estes Park.

  1. Marys Lake 69/115-kV transmission line upgrade and substation expansion projects

    International Nuclear Information System (INIS)

    1996-05-01

    Western Area Power Administration (Western) and the Platte River Power Authority (Platte River) propose to upgrade portions of the existing electric transmission and substation system that serves the Town of Estes Park, Colorado. The existing transmission lines between the Estes Power Plant Switchyard and the Marys Lake Substation include a 115,000 volt (115-kV) line and 69,000 volt (69-kV) line. Approximately one mile is a double-circuit 115/69-kV line on steel lattice structures, and approximately two miles consists of separate single-circuit 115-kV and a 69-kV lines, constructed on wood H-Frame structures. Both lines were constructed in 1951 by the US Bureau of Reclamation. The existing transmission lines are on rights-of-way (ROW) that vary from 75 feet to 120 feet and are owned by Western. There are 48 landowners adjacent to the existing ROW. All of the houses were built adjacent to the existing ROW after the transmission lines were constructed. Upgrading the existing 69-kV transmission line between the Marys Lake Substation and the Estes Power Plant Switchyard to 115-kV and expanding the Marys Lake Substation was identified as the most effective way in which to improve electric service to Estes Park. The primary purpose and need of the proposed project is to improve the reliability of electric service to the Town of Estes Park. Lack of reliability has been a historical concern, and reliability will always be less than desired until physical improvements are made to the electrical facilities serving Estes Park

  2. Specification of requirements for upgrades using digital instrument and control systems. Report prepared within the framework of the international working group on nuclear power plant control and instrumentation

    International Nuclear Information System (INIS)

    1999-01-01

    The need to develop good specifications of requirements for instrument and control (I and C) systems applies throughout the world and is becoming more and more important as more upgrades are planned. Better guidance on how to develop good requirements specifications would support safer, more effective and more economical refits and upgrades. The need for this was pointed out by the IAEA International Working Group on Nuclear Power Plant Control and Instrumentation (IWG-NPPCI). This report is the result of a series of advisory and consultants meetings held by the IAEA in 1997 and 1998 in Vienna. The scope of the activities described covers a methodology for the determination of requirements and the development of the necessary specifications and plans needed through the life-cycle of digital instrumentation and control systems. It is restricted to technical aspects and indicates subjects which should be included in specifications and plans at different phases

  3. Upgrade of the ATLAS hadronic Tile calorimeter for the High luminosity LHC

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00236332; The ATLAS collaboration

    2016-01-01

    The Tile Calorimeter (TileCal) is the hadronic calorimeter covering the central region of the ATLAS detector at the LHC. It is a sampling calorimeter consisting of alternating thin steel plates and scintillating tiles. Wavelength shifting fibers coupled to the tiles collect the produced light and are read out by photomultiplier tubes. An analog sum of the processed signal of several photomultipliers serves as input to the first level of trigger. Photomultiplier signals are then digitized and stored on detector and are only transferred off detector once the first trigger acceptance has been confirmed. The Large Hadron Collider (LHC) has envisaged a series of upgrades towards a High Luminosity LHC (HL-LHC) delivering five times the LHC nominal instantaneous luminosity. The ATLAS Phase II upgrade, in 2024, will accommodate the detector and data acquisition system for the HL-LHC. In particular, TileCal will undergo a major replacement of its on- and off-detector electronics. All signals will be digitized and then...

  4. The Level-1 Tile-Muon Trigger in the Tile Calorimeter Upgrade Program

    CERN Document Server

    Ryzhov, Andrey; The ATLAS collaboration

    2016-01-01

    The Tile Calorimeter (TileCal) is the central hadronic calorimeter of the ATLAS experiment at the Large Hadron Collider (LHC). The TileCal provides highly-segmented energy measurements for incident particles. Information from TileCal's last radial layer can assist in muon tagging using Level-1 muon trigger. It can help in the rejection of fake muon triggers arising from background radiation (slow charged particles - protons) without degrading the efficiency of the trigger. The TileCal main activity for Phase-0 upgrade ATLAS program (2013-2014) was the activation of the TileCal third layer signal for assisting the muon trigger at 1.0<|η|<1.3 (Tile-Muon Trigger). This report describes the Tile-Muon Trigger at TileCal upgrade activities, focusing on the new on-detector electronics such as Tile Muon Digitizer Board (TMDB) to provide (receive and digitize) the signal from eight TileCal modules to three Level-1 muon endcap sector logic blocks.

  5. The upgraded CDF front end electronics for calorimetry

    Energy Technology Data Exchange (ETDEWEB)

    Drake, G.; Frei, D.; Hahn, S.R.; Nelson, C.A.; Segler, S.L.; Stuermer, W.

    1991-11-01

    The front end electronics used in the calorimetry of the CDF detector has been upgraded to meet system requirements for higher expected luminosity. A fast digitizer utilizing a 2 {mu}Sec, 16 bit ADC has been designed and built. Improvements to the front end trigger circuitry have been implemented, including the production of 900 new front end modules. Operational experience with the previous system is presented, with discussion of the problems and performance goals.

  6. The upgraded CDF front end electronics for calorimetry

    International Nuclear Information System (INIS)

    Drake, G.; Frei, D.; Hahn, S.R.; Nelson, C.A.; Segler, S.L.; Stuermer, W.

    1991-11-01

    The front end electronics used in the calorimetry of the CDF detector has been upgraded to meet system requirements for higher expected luminosity. A fast digitizer utilizing a 2 μSec, 16 bit ADC has been designed and built. Improvements to the front end trigger circuitry have been implemented, including the production of 900 new front end modules. Operational experience with the previous system is presented, with discussion of the problems and performance goals

  7. Successful initiation of and management through a distributed computer upgrade

    International Nuclear Information System (INIS)

    Barich, F.T.; Crawford, T.H.

    1995-01-01

    Processing capacity, the lack of data analysis tools, obsolescence, and spare parts issues are forcing utilities to upgrade or replace their plant computer systems with newer, larger systems. As a result, the utility faces an increasing number of new technologies, such as fiber optics and communication standards (FDDI, ATM, etc.), Graphic User Interface using X-Windows, and distributed architectures that eliminate the host based computer. Technologies such as these, if properly applied, can greatly enhance the capabilities and functions of the existing system. Besides this, the utility also faces funtionality previously not available through the plant computer, such as integrated plant monitoring and digital controls, voice, imaging, etc. With computing technology vastly changing from traditional host systems, the utility confronts the question, open-quotes what are my needs (now and for the future), and what new system can meet those needs most effectively?close quotes. This paper describes the management process necessary to define the needs and then carry out a successful computer replacement project

  8. Teaching and learning English through digital game projects

    Directory of Open Access Journals (Sweden)

    Jonathan deHaan

    2011-04-01

    Full Text Available Digital games are receiving increasing attention by researchers and practitioners in education; however, most of the theory and pedagogy focus on general education or language and literacy development of native speakers. There are very few investigations of game play or game culture and second language development. Language teachers and institutions must know more about games to use the media effectively. Two completed extracurricular projects, based on constructionist learning and media literacy theories and practices, are described in this paper: game design and game magazine creation. The action research projects aimed to guide students towards a better understanding of games’ formal features and technologies through their active creation of games and game-related media, and to improve their spoken and written English language skills. In general, students learned and practised a variety of language and technology skills with the design projects. The projects motivated the students, challenged the students, and provided many opportunities for authentic discussions in the foreign language. Various suggestions, based on the teacher and student experiences of these projects, are made for other language teachers interested in conducting creative game-based projects with their students.

  9. ATLAS upgrades for the next decades

    CERN Document Server

    Hopkins, Walter; The ATLAS collaboration

    2014-01-01

    After the successful LHC operation at the center-of-mass energies of 7 and 8 TeV in 2010-2012, plans are actively advancing for a series of upgrades of the accelerator, culminating roughly ten years from now in the high-luminosity LHC (HL-LHC) project, delivering of the order of five times the LHC nominal instantaneous luminosity along with luminosity leveling. The final goal is to extend the dataset from about few hundred \\ifb\\ expected for LHC running to 3000 fb$^{-1}$ by around 2035 for ATLAS and CMS. In parallel, the experiments need to be keep lockstep with the accelerator to accommodate running beyond the nominal luminosity this decade. Current planning in ATLAS envisions significant upgrades to the detector during the consolidation of the LHC to reach full LHC energy and further upgrades. The challenge of coping with the HL-LHC instantaneous and integrated luminosity, along with the associated radiation levels, requires further major changes to the ATLAS detector. The designs are developing rapidly for...

  10. Implementation of an advanced digital feedwater control system at the Prairie Island nuclear generating station

    International Nuclear Information System (INIS)

    Paris, R.E.; Gaydos, K.A.; Hill, J.O.; Whitson, S.G.; Wirkkala, R.

    1990-05-01

    EPRI Project RP2126-4 was a cooperative effort between TVA, EPRI, and Westinghouse which resulted in the demonstration of a prototype of a full range, fully automatic feedwater control system, using fault tolerant digital technology, at the TVA Sequoyah simulator site. That prototype system also included advanced signal validation algorithms and an advanced man-machine interface that used CRT-based soft-control technology. The Westinghouse Advanced Digital Feedwater Control System (ADFCS) upgrade, which contains elements that were part of that prototype system, has since been installed at Northern States Power's Prairie Island Unit 2. This upgrade was very successful due to the use of an advanced control system design and the execution of a well coordinated joint effort between the utility and the supplier. The project experience is documented in this report to help utilities evaluate the technical implications of such a project. The design basis of the Prairie Island ADFCS signal validation for input signal failure fault tolerance is outlined first. Features of the industry-proven system control algorithms are then described. Pre-shipment hardware-in-loop and factory acceptance testing of the Prairie Island system are summarized. Post-shipment site testing, including preoperational and plant startup testing, is also summarized. Plant data from the initial system startup is included. The installation of the Prairie Island ADFCS is described, including both the feedwater control instrumentation and the control board interface. Modification of the plant simulator and operator and I ampersand C personnel training are also discussed. 6 refs., 14 figs., 3 tabs

  11. A prototype fully digital data acquisition system upgrade for the TOFOR neutron spectrometer at JET

    Energy Technology Data Exchange (ETDEWEB)

    Skiba, Mateusz, E-mail: mateusz.skiba@physics.uu.se [Department of Physics and Astronomy, Uppsala University (Sweden); Ericsson, Göran; Hjalmarsson, Anders; Hellesen, Carl; Conroy, Sean; Andersson-Sundén, Erik; Eriksson, Jacob [Department of Physics and Astronomy, Uppsala University (Sweden); JET Contributors [EUROfusion Consortium, JET, Culham Science Centre, Abingdon OX14 3DB (United Kingdom)

    2016-10-11

    A prototype of a fully digital data acquisition system upgrade for the TOFOR time-of-flight fusion neutron spectrometer at JET has been implemented and evaluated. The core of the system is composed of five fast PXIe waveform digitisers (1 GSPS, 12 bits) with large internal fast memory (1 GB). Due to the complexity and high requirements on timing precision of the spectrometer, the design and implementation of such a system poses numerous technical challenges, in particular regarding time alignment and synchronisation of signal paths and digitiser modules. These issues and their solutions, as pertaining to the TOFOR spectrometer, are presented in detail in the present paper. As a final assessment of the ability of the new data acquisition system to reproduce the capabilities of the original TOFOR system, a thorough comparison of results produced using both systems is presented. The comparison with TOFOR has been performed with satisfying results. Two immediate advantages of the new data acquisition system are significantly improved triggering dead time (from about 70 ns to 10 ns) and the ability to adjust the triggering thresholds as needed during the analysis step. The enhanced spectroscopic capabilities of the new data acquisition system will be reported on in future publications.

  12. Analysis of integrated plant upgrading/life extension programs

    International Nuclear Information System (INIS)

    McCutchan, D.A.; Massie, H.W. Jr.; McFetridge, R.H.

    1988-01-01

    A present-worth generating cost model has been developed and used to evaluate the economic value of integrated plant upgrading life extension project in nuclear power plants. This paper shows that integrated plant upgrading programs can be developed in which a mix of near-term availability, power rating, and heat rate improvements can be obtained in combination with life extension. All significant benefits and costs are evaluated from the viewpoint of the utility, as measured in discounted revenue requirement differentials between alternative plans which are equivalent in system generating capacity. The near-term upgrading benefits are shown to enhance the benefit picture substantially. In some cases the net benefit is positive, even if the actual life extension proves to be less than expected

  13. The Phase-I Trigger Readout Electronics Upgrade of the ATLAS Liquid Argon Calorimeters

    CERN Document Server

    Enari, Yuji; The ATLAS collaboration

    2018-01-01

    Electronics developments are pursued for the trigger readout of the ATLAS Liquid-Argon Calorimeter towards the Phase-I upgrade scheduled in the LHC shut-down period of 2019-2020. The LAr Trigger Digitizer system will digitize 34000 channels at a 40 MHz sampling with 12 bit precision after the bipolar shaper at the front-end system, and transmit to the LAr Digital Processing system in the back-end to extract the transverse energies. Results of ASIC developments including QA and radiation hardness evaluations, performances of the final prototypes and results of the system integration tests will presented along with the overall system design.

  14. Thes - Website for Thermal Shields Upgrade Management

    CERN Document Server

    Micula, Adina

    2013-01-01

    There are a total of 1695 thermal shields (TS) in the interconnections between the superconducting magnets. During LHC Long Shutdown 1 (LS1) all of these TS are being upgraded with a new fixation design. This procedure involves the transport of all the TS from LHC to a workshop on the surface where they are being modified and the subsequent transport of the upgraded TS back to the tunnel where they are laid on the cryostats and await the closure of the interconnection. These operations have to be carefully coordinated in order to ensure that there are always enough modified TS to satisfy the demand in the tunnel and respect the time constraint imposed by the schedule of LS1. As part of my summer project, I developed a database driven website whose aim is to enable the TS upgrade monitoring.

  15. Getting Digital Assets from Public–Private Partnership Research Projects through “The Valley of Death,” and Making Them Sustainable

    Science.gov (United States)

    Aartsen, Wendy; Peeters, Paul; Wagers, Scott; Williams-Jones, Bryn

    2018-01-01

    Projects in public–private partnerships, such as the Innovative Medicines Initiative (IMI), produce data services and platforms (digital assets) to help support the use of medical research data and IT tools. Maintaining these assets beyond the funding period of a project can be a challenge. The reason for that is the need to develop a business model that integrates the perspectives of all different stakeholders involved in the project, and these digital assets might not necessarily be addressing a problem for which there is an addressable market of paying customers. In this manuscript, we review four IMI projects and the digital assets they produced as a means of illustrating the challenges in making digital assets sustainable and the lessons learned. To progress digital assets beyond proof-of-concept into widely adopted tools, there is a need for continuation of multi-stakeholder support tailored to these assets. This would be best done by implementing a structure similar to the accelerators that are in place to help transform startup businesses into growing and thriving businesses. The aim of this article is to highlight the risk of digital asset loss and to provoke discussion on the concept of developing an “accelerator” for digital assets from public–private partnership research projects to increase the chance that digital assets will be sustained and continue to add value long after a project has ended. PMID:29594123

  16. Small-scale upgrading and refinement of biogas; Smaaskalig uppgradering och foeraedling av biogas

    Energy Technology Data Exchange (ETDEWEB)

    Blom, Helena; Mccann, Michael; Westman, Johan (Poeyry SwedPower AB, Stockholm (Sweden))

    2012-02-15

    Small-scale upgrading and refinement of biogas is a report which aims to compile the state of knowledge in small-scale biogas upgrading. The project have been a collaboration with Agrovaest and Energy Farm and was funded by the Foundation for Agricultural Research, Western Goetaland and the Agriculture Department. The technology available for small scale upgrade has been examined from the technical and economic standpoint. An economic comparison has been made and the production of upgraded biogas has been estimated for different raw gas flows. The work also contains information related to biogas production, upgrading and a comparison of liquid biogas, DME and Ecopar-diesel

  17. Guidelines for reliability analysis of digital systems in PSA context. Phase 1 status report

    International Nuclear Information System (INIS)

    Authen, S.; Larsson, J.; Bjoerkman, K.; Holmberg, J.-E.

    2010-12-01

    Digital protection and control systems are appearing as upgrades in older nuclear power plants (NPPs) and are commonplace in new NPPs. To assess the risk of NPP operation and to determine the risk impact of digital system upgrades on NPPs, quantitative reliability models are needed for digital systems. Due to the many unique attributes of these systems, challenges exist in systems analysis, modeling and in data collection. Currently there is no consensus on reliability analysis approaches. Traditional methods have clearly limitations, but more dynamic approaches are still in trial stage and can be difficult to apply in full scale probabilistic safety assessments (PSA). The number of PSAs worldwide including reliability models of digital I and C systems are few. A comparison of Nordic experiences and a literature review on main international references have been performed in this pre-study project. The study shows a wide range of approaches, and also indicates that no state-of-the-art currently exists. The study shows areas where the different PSAs agree and gives the basis for development of a common taxonomy for reliability analysis of digital systems. It is still an open matter whether software reliability needs to be explicitly modelled in the PSA. The most important issue concerning software reliability is proper descriptions of the impact that software-based systems has on the dependence between the safety functions and the structure of accident sequences. In general the conventional fault tree approach seems to be sufficient for modelling reactor protection system kind of functions. The following focus areas have been identified for further activities: 1. Common taxonomy of hardware and software failure modes of digital components for common use 2. Guidelines regarding level of detail in system analysis and screening of components, failure modes and dependencies 3. Approach for modelling of CCF between components (including software). (Author)

  18. Guidelines for reliability analysis of digital systems in PSA context. Phase 1 status report

    Energy Technology Data Exchange (ETDEWEB)

    Authen, S.; Larsson, J. (Risk Pilot AB, Stockholm (Sweden)); Bjoerkman, K.; Holmberg, J.-E. (VTT, Helsingfors (Finland))

    2010-12-15

    Digital protection and control systems are appearing as upgrades in older nuclear power plants (NPPs) and are commonplace in new NPPs. To assess the risk of NPP operation and to determine the risk impact of digital system upgrades on NPPs, quantitative reliability models are needed for digital systems. Due to the many unique attributes of these systems, challenges exist in systems analysis, modeling and in data collection. Currently there is no consensus on reliability analysis approaches. Traditional methods have clearly limitations, but more dynamic approaches are still in trial stage and can be difficult to apply in full scale probabilistic safety assessments (PSA). The number of PSAs worldwide including reliability models of digital I and C systems are few. A comparison of Nordic experiences and a literature review on main international references have been performed in this pre-study project. The study shows a wide range of approaches, and also indicates that no state-of-the-art currently exists. The study shows areas where the different PSAs agree and gives the basis for development of a common taxonomy for reliability analysis of digital systems. It is still an open matter whether software reliability needs to be explicitly modelled in the PSA. The most important issue concerning software reliability is proper descriptions of the impact that software-based systems has on the dependence between the safety functions and the structure of accident sequences. In general the conventional fault tree approach seems to be sufficient for modelling reactor protection system kind of functions. The following focus areas have been identified for further activities: 1. Common taxonomy of hardware and software failure modes of digital components for common use 2. Guidelines regarding level of detail in system analysis and screening of components, failure modes and dependencies 3. Approach for modelling of CCF between components (including software). (Author)

  19. AN INTERNET RACK MONITOR-CONTROLLER FOR APS LINAC RF ELECTRONICS UPGRADE

    Energy Technology Data Exchange (ETDEWEB)

    Ma, Hengjie; Smith, Terry; Nassiri, Alireza; Sun, Yine; Doolittle, Lawrence; Ratti, Alex

    2016-06-01

    To support the research and development in APS LINAC area, the existing LINAC rf control performance needs to be much improved, and thus an upgrade of the legacy LINAC rf electronics becomes necessary. The proposed upgrade plan centers on the concept of using a modern, network-attached, rackmount digital electronics platform –Internet Rack Monitor-Controller (or IRMC) to achieve the goal of modernizing the rf electronics at a lower cost. The system model of the envisioned IRMC is basically a 3-tier stack with a high-performance DSP in the mid-layer to perform the core tasks of real-time rf data processing and controls. The Digital Front-End (DFE) attachment layer at bottom bridges the applicationspecific rf front-ends to the DSP. A network communication gateway, together with an embedded event receiver (EVR) in the top layer merges the Internet Rack MonitorController node into the networks of the accelerator controls infrastructure. Although the concept is very much in trend with today’s Internet-of-Things (IoT), this implementation has actually been used in the accelerators for over two decades.

  20. Comparison of maximum intensity projection and digitally reconstructed radiographic projection for carotid artery stenosis measurement

    International Nuclear Information System (INIS)

    Hyde, Derek E.; Habets, Damiaan F.; Fox, Allan J.; Gulka, Irene; Kalapos, Paul; Lee, Don H.; Pelz, David M.; Holdsworth, David W.

    2007-01-01

    Digital subtraction angiography is being supplanted by three-dimensional imaging techniques in many clinical applications, leading to extensive use of maximum intensity projection (MIP) images to depict volumetric vascular data. The MIP algorithm produces intensity profiles that are different than conventional angiograms, and can also increase the vessel-to-tissue contrast-to-noise ratio. We evaluated the effect of the MIP algorithm in a clinical application where quantitative vessel measurement is important: internal carotid artery stenosis grading. Three-dimensional computed rotational angiography (CRA) was performed on 26 consecutive symptomatic patients to verify an internal carotid artery stenosis originally found using duplex ultrasound. These volumes of data were visualized using two different postprocessing projection techniques: MIP and digitally reconstructed radiographic (DRR) projection. A DRR is a radiographic image simulating a conventional digitally subtracted angiogram, but it is derived computationally from the same CRA dataset as the MIP. By visualizing a single volume with two different projection techniques, the postprocessing effect of the MIP algorithm is isolated. Vessel measurements were made, according to the NASCET guidelines, and percentage stenosis grades were calculated. The paired t-test was used to determine if the measurement difference between the two techniques was statistically significant. The CRA technique provided an isotropic voxel spacing of 0.38 mm. The MIPs and DRRs had a mean signal-difference-to-noise-ratio of 30:1 and 26:1, respectively. Vessel measurements from MIPs were, on average, 0.17 mm larger than those from DRRs (P<0.0001). The NASCET-type stenosis grades tended to be underestimated on average by 2.4% with the MIP algorithm, although this was not statistically significant (P=0.09). The mean interobserver variability (standard deviation) of both the MIP and DRR images was 0.35 mm. It was concluded that the MIP

  1. Optimal fringe angle selection for digital fringe projection technique.

    Science.gov (United States)

    Wang, Yajun; Zhang, Song

    2013-10-10

    Existing digital fringe projection (DFP) systems mainly use either horizontal or vertical fringe patterns for three-dimensional shape measurement. This paper reveals that these two fringe directions are usually not optimal where the phase change is the largest to a given depth variation. We propose a novel and efficient method to determine the optimal fringe angle by projecting a set of horizontal and vertical fringe patterns onto a step-height object and by further analyzing two resultant phase maps. Experiments demonstrate the existence of the optimal angle and the success of the proposed optimal angle determination method.

  2. Design, Implementation, and Lessons Learned from a Digital Storytelling Project in an Undergraduate Health Promotion Theory Course

    Science.gov (United States)

    Rimando, Marylen; Smalley, K. Bryant; Warren, Jacob C.

    2015-01-01

    This article describes the design, implementation and lessons learned from a digital storytelling project in a health promotion theory course. From 2011-2012, 195 health promotion majors completed a digital storytelling project at a Midwestern university. The instructor observed students' understanding of theories and models. This article adds to…

  3. The North West Sturgeon Upgrader: Good Money after Bad?

    Directory of Open Access Journals (Sweden)

    F.L. Ted Morton

    2015-04-01

    Full Text Available The North West Upgrader (NWU project illustrates the risks of government-led efforts to diversify Alberta’s economy. What began as a low-risk, low-cost project to encourage domestic bitumen upgrading has morphed into a multi-billion dollar boondoggle with high risks for Alberta taxpayers. Originally, the Government of Alberta (GOA intended to collect bitumen from producers in lieu of royalties and sell it to provincial upgraders, adding value to the commodity and creating jobs and revenues in Alberta. The private sector was to build and finance the new upgraders, as well as assume the market risks of low margins. The 2008 financial collapse effectively killed that plan. With just one prospect (NWU remaining, the Stelmach government decided to be more than the middleman. The GOA committed to retain ownership of the bitumen up to the point of sale, pay NWU a toll for the processing, and then sell the upgraded product. Under a new “take or pay” arrangement, the GOA assumed liabilities estimated at $19 billion over the 30-year contract with NWU, as well as the market risk of having to sell the upgraded product at below costs. As four different premiers and six different energy ministers cycled through Edmonton, construction costs soared to over $8 billion. The original $6.5 billion cap on the GOA’s liability for construction costs disappeared, and the GOA—and by extension, Alberta taxpayers— are now on the hook for $26 billion in processing payments — the equivalent of $63 per barrel. Falling oil prices are further undermining the prospects for the investment to break even. Written from a rare insider’s perspective, this paper analyzes the lack of effective government oversight and due diligence surrounding the North West Upgrade. Rather than being an exception, NWU fits the larger and longer pattern of failed “forced-growth” diversification initiatives in Alberta and other provinces. Alberta politicians should think long and

  4. Model for impact assessment in human factors engineering project of PWR plants with digital control

    International Nuclear Information System (INIS)

    Roedel, Frederico G.; Schirru, Roberto

    2017-01-01

    New nuclear power plants are being designed with the digital Instrumentation and Control (I and C) as the backbone for the functions of protection, control, monitoring and display and with digital Human-System Interface (HSI). In this new environment, rather than play physical control actions, the operators begin to act as decision makers and, within this context, the Human Factors Engineering (HFE) has become an integral part of the projects. As the operational experience with the use of digital I and C systems and HSI is limited since, besides the small number of applications, it is proprietary, the objective of this work is to carry out an assessment in order to identify the most relevant aspects of a digital HSI project. The proposed model is based on concepts of fuzzy logic, uses MATLAB for data processing, defines criteria for evaluation and quantification of impacts in the project and has been applied to the General Principles and the Guidelines presented in the NUREG-0700. The assessment indicated that the Guidelines for User-Interface Interaction and Management, for Information Display and for Computer-Based Procedures System should be carefully evaluated in the design of a digital HSI considering the new Users Tasks Demand, the Organization of HSI Elements and the Work Environment. (author)

  5. Model for impact assessment in human factors engineering project of PWR plants with digital control

    Energy Technology Data Exchange (ETDEWEB)

    Roedel, Frederico G.; Schirru, Roberto, E-mail: froedel@nuclear.ufrj.br, E-mail: schirru@lmp.ufrj.br [Coordenacao de Pos-Graduacao e Pesquisa de Engenharia (COPPE/UFRJ), Rio de Janeiro, RJ (Brazil). Departamento de Engenharia Nuclear

    2017-07-01

    New nuclear power plants are being designed with the digital Instrumentation and Control (I and C) as the backbone for the functions of protection, control, monitoring and display and with digital Human-System Interface (HSI). In this new environment, rather than play physical control actions, the operators begin to act as decision makers and, within this context, the Human Factors Engineering (HFE) has become an integral part of the projects. As the operational experience with the use of digital I and C systems and HSI is limited since, besides the small number of applications, it is proprietary, the objective of this work is to carry out an assessment in order to identify the most relevant aspects of a digital HSI project. The proposed model is based on concepts of fuzzy logic, uses MATLAB for data processing, defines criteria for evaluation and quantification of impacts in the project and has been applied to the General Principles and the Guidelines presented in the NUREG-0700. The assessment indicated that the Guidelines for User-Interface Interaction and Management, for Information Display and for Computer-Based Procedures System should be carefully evaluated in the design of a digital HSI considering the new Users Tasks Demand, the Organization of HSI Elements and the Work Environment. (author)

  6. Upgrading the ATLAS Tile Calorimeter Electronics

    CERN Document Server

    Popeneciu, G; The ATLAS collaboration

    2014-01-01

    The Tile Calorimeter (TileCal) is the central hadronic calorimeter of the ATLAS experiment at LHC. Around 2023, after the upgrade of the LHC (High Luminosity LHC, phase 2) the peak luminosity will increase by a factor of 5 compared to the design value (1034 cm-2 s-1), thus requiring an upgrade of the TileCal readout electronics. Except the 9852 photomultipliers (PMTs), most of the on- and off-detector electronics will be replaced, with the aim of digitizing all PMT pulses at 40 MHz at the front-end level and sending them with 10 Gbps optical links to the back-end electronics. Moreover, to increase reliability, redundancy will be introduced at different levels. Three different options are currently being investigated for the front-end electronics and extensive test beam studies are planned to select the best option. One demonstrator prototype module is also planned to be inserted in TileCal in 2014 that will include hybrid electronic components able to probe the new design, but still compatible with the presen...

  7. Safety upgrading at PAKS Nuclear Power Plant

    International Nuclear Information System (INIS)

    Bajsz, J.; Elter, J.

    2000-01-01

    The operation of Paks NPP has reached its half time. Until this time the plant fulfilled expectations raised before its construction: the four units have produced safely and reliably more than 200 TWh electricity. The production of the plant has been at the stable level since its construction and has provided 43-38 % of electricity consumed in Hungary. The annual production is around 14 TWh, which means a load factor higher than 85 %. Safety upgrading activities [1] at Paks had started in the late eighties, when the commissioning work of units 3 and 4 were carried out. That time the main emphases were put to lessons learned of the TMI and Chernobyl accidents. The international reviews hosted by our plant widened our review's scope. To systematize our approach a complete safety review, the AGNES (Advanced General Safety and New Evaluation of Safety) project was started in 1991. The goal of the project was to evaluate to what extent Paks NPP satisfied the current international safety expectations and to help in determining the priorities for safety enhancement and upgrading measures. The project completed in 1994 ranked our safety upgrading measures by safety significance, which became a basis for technical design work and financial scheduling. The other important outcome of the AGNES project was the introduction the Periodical Safety Review regime by our nuclear authority. These periodical reviews held after 10 years of operation offer the possibility - and obligation for the licensee - to perform a comprehensive assessment of the safety of the plant, to evaluate the integral effects of changes of circumstances happened during the review period. The goal of these reviews is to deal with cumulative effects of NPP ageing, modifications, operating experience and technical developments aimed at ensuring a high level of safety throughout plant service life. The execution of our safety-upgrading program is well advancing. For the whole program from 1996 to 2002 250

  8. Creating Ambassadors Through Digital Media: reflections from the Sandby borg project

    Directory of Open Access Journals (Sweden)

    Ludvig Papmehl-Dufay

    2017-12-01

    Full Text Available In 2010, five caches of top quality Migration-period jewellery were found at the Iron Age ring fort of Sandby borg, on the island of Öland, Sweden. When subsequent archaeological investigations revealed evidence of a violent massacre in the late 5th century, which left the victims lying on the spot where they had fallen, media and public interest increased rapidly. Since the local community raised concerns about the fast-growing interest in the project and the sensitive status of the ring fort, digital media was used as an important tool to communicate and work with different stakeholders. In this article, we present some experiences and insights from two separate projects with the aim of involving the public; a public outreach programme, Culture for Children, conducted in 2014-2015 and supported by the Swedish Arts Council, and a crowdfunding project launched at Kickstarter in December 2014, which enabled one season of fieldwork in 2015. The article concludes with a brief reflection on the topic of digital engagement in public archaeology.

  9. Supplement analysis for the proposed upgrades to the tank farm ventilation, instrumentation, and electrical systems under Project W-314 in support of tank farm restoration and safe operations

    International Nuclear Information System (INIS)

    1997-05-01

    The mission of the TWRS program is to store, treat, and immobilize highly radioactive tank waste in an environmentally sound, safe, and cost-effective manner. Within this program, Project W-314, Tank Farm Restoration and Safe Operations, has been established to provide upgrades in the areas of instrumentation and control, tank ventilation, waste transfer, and electrical distribution for existing tank farm facilities. Requirements for tank farm infrastructure upgrades to support safe storage were being developed under Project W-314 at the same time that the TWRS EIS alternative analysis was being performed. Project W-314 provides essential tank farm infrastructure upgrades to support continued safe storage of existing tank wastes until the wastes can be retrieved and disposed of through follow-on TWRS program efforts. Section4.0 provides a description of actions associated with Project W-314. The TWRS EIS analyzes the environmental consequences form the entire TWRS program, including actions similar to those described for Project W-314 as a part of continued tank farm operations. The TWRS EIS preferred alternative was developed to a conceptual level of detail to assess bounding impact areas. For this Supplement Analysis, in each of the potential impact areas for Project W-314, the proposed action was evaluated and compared to the TWRS EIS evaluation of the preferred alternative (Section 5.0). Qualitative and/or quantitative comparisons are then provided in this Supplement Analysis to support a determination on the need for additional National Environmental Policy Act (NEPA) analysis. Based on this Supplement Analysis, the potential impacts for Project W-314 would be small in comparison to and are bounded by the impacts assessed for the TWRS EIS preferred alternative, and therefore no additional NEPA analysis is required (Section 7.0)

  10. A summary of the regional upgrader business plan

    International Nuclear Information System (INIS)

    Carpenter, J.S.

    1991-01-01

    The stakeholders with potential interests in an Alberta regional upgrader for bitumen, heavy oil, or refinery residue were identified and a reasonably comprehensive business plan for such an upgrader was created and analyzed. Assuming a plant accepting 30,000 bbl/d of feedstock using known hydrocracking and hydroprocessing technologies, producing a synthetic crude oil of a quality good enough to substitute for Alberta light crude in existing refineries, the risks, financing arrangements, and base case economics were examined. According to reasonable price forecasts and a socio-economic benefit assessment, there are enough benefits in such an upgrader to make its construction attractive in the near term. However, conventional investment economics make it unlikely that such a project could be supported in Alberta's current business environment. Accordingly, the business plan was revised to reduce risks and increase profitability to equity holders. The plant capacity would be doubled, with a major oil company acquiring half the output for its own production at less than half the installed cost. The rest of the plant would be owned by government and by smaller producers who would gain access to the upgrader feedstock capacity. A collar mechanism is offered to reduce bitumen price risks without impairing upgrader economics. A number of niche opportunities are also identified within the regional upgrader concept that would further enhance the return through lower costs. 2 figs., 4 tabs

  11. Getting Digital Assets from Public–Private Partnership Research Projects through “The Valley of Death,” and Making Them Sustainable

    Directory of Open Access Journals (Sweden)

    Wendy Aartsen

    2018-03-01

    Full Text Available Projects in public–private partnerships, such as the Innovative Medicines Initiative (IMI, produce data services and platforms (digital assets to help support the use of medical research data and IT tools. Maintaining these assets beyond the funding period of a project can be a challenge. The reason for that is the need to develop a business model that integrates the perspectives of all different stakeholders involved in the project, and these digital assets might not necessarily be addressing a problem for which there is an addressable market of paying customers. In this manuscript, we review four IMI projects and the digital assets they produced as a means of illustrating the challenges in making digital assets sustainable and the lessons learned. To progress digital assets beyond proof-of-concept into widely adopted tools, there is a need for continuation of multi-stakeholder support tailored to these assets. This would be best done by implementing a structure similar to the accelerators that are in place to help transform startup businesses into growing and thriving businesses. The aim of this article is to highlight the risk of digital asset loss and to provoke discussion on the concept of developing an “accelerator” for digital assets from public–private partnership research projects to increase the chance that digital assets will be sustained and continue to add value long after a project has ended.

  12. Progress on the Design of the Storage Ring Vacuum System for the Advanced Photon Source Upgrade Project

    Energy Technology Data Exchange (ETDEWEB)

    Stillwell, B.; Billett, B.; Brajuskovic, B.; Carter, J.; Kirkus, E.; Lale, M.; Lerch, J.; Noonan, J.; O' Neill, M.; Rocke, B.; Suthar, K.; Walters, D.; Wiemerslage, G.; Zientek, J.

    2017-06-20

    Recent work on the design of the storage ring vacuum system for the Advanced Photon Source Upgrade project (APS-U) includes: revising the vacuum system design to accommodate a new lattice with reverse bend magnets, modifying the designs of vacuum chambers in the FODO sections for more intense incident synchrotron radiation power, modifying the design of rf-shielding bellows liners for better performance and reliability, modifying photon absorber designs to make better use of available space, and integrated planning of components needed in the injection, extraction and rf cavity straight sections. An overview of progress in these areas is presented.

  13. Linac upgrade plan for the KEK B-Factory

    International Nuclear Information System (INIS)

    Enomoto, Atsushi; Anami, Shozo; Kamitani, Takuya; Hanaki, Hirofumi; Shidara, Tetsuo; Sato, Isamu

    1993-01-01

    In the KEK B-Factory plan, e+/e- collider rings with 3.5- GeV positions and 8-GeV electrons are being considered, and full-energy injection from the existing linac is required. The acceleration energy of the linac must be upgraded from 2.5 to 8 GeV. The most effective way has been searched from several points of view, such as the beam quality, ease of beam handling, and construction. This article describes the basic plan of the energy upgrade and recent progress regarding this project

  14. Phase-I Trigger Readout Electronics Upgrade for the ATLAS Liquid-Argon Calorimeters

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00452211; The ATLAS collaboration

    2017-01-01

    The upgrade of the Large Hadron Collider (LHC) scheduled for the Long Shut-down period of 2019-2020 (LS2), referred to as Phase-I upgrade, will increase the instantaneous luminosity to about three times the design value. Since the current ATLAS trigger system does not allow sucient increase of the trigger rate, an improvement of the trigger system is required. The Liquid Argon (LAr) Calorimeter read-out will therefore be modi ed to use digital trigger signals with a higher spatial granularity in order to improve the identi cation effciencies of electrons, photons, tau, jets and missing energy, at high background rejection rates at the Level-1 trigger.

  15. UPGRADES

    CERN Multimedia

    D. Contardo and J. Spalding

    2013-01-01

      LS1 and Phase 1 The detector projects targeting LS1 are progressing well, and a fully integrated schedule developed by Technical Coordination includes installation milestones and a detailed work-plan. The first chambers of the RPC system were produced and are being qualified. Production will ramp up this year to a rate of 20 chambers per month. 32 chambers of the CSC system have been fabricated for the ME4/2 CSC stations, and production proceeds at a rate of 4 per month. The new ME1/1 Front-End Board is in production and the off-detector electronics integration tests are ongoing. The new Theta Trigger Boards for the DT readout production is started and the relocation of the Sector Collector boards with new Optical Links as been successfully tested. All the components for the upgrade of the Forward Hadron Calorimeter PMTs have been received at CERN and assemblies are being qualified. The situation is similar for the Hadron Outer Calorimeter new SiPMs and readout modules. Three projects are plan...

  16. Hardware upgrade for A2 data acquisition

    Energy Technology Data Exchange (ETDEWEB)

    Ostrick, Michael; Gradl, Wolfgang; Otte, Peter-Bernd; Neiser, Andreas; Steffen, Oliver; Wolfes, Martin; Koerner, Tito [Institut fuer Kernphysik, Mainz (Germany); Collaboration: A2-Collaboration

    2014-07-01

    The A2 Collaboration uses an energy tagged photon beam which is produced via bremsstrahlung off the MAMI electron beam. The detector system consists of Crystal Ball and TAPS and covers almost the whole solid angle. A frozen-spin polarized target allows to perform high precision measurements of polarization observables in meson photo-production. During the last summer, a major upgrade of the data acquisition system was performed, both on the hardware and the software side. The goal of this upgrade was increased reliability of the system and an improvement in the data rate to disk. By doubling the number of readout CPUs and employing special VME crates with a split backplane, the number of bus accesses per readout cycle and crate was cut by a factor of two, giving almost a factor of two gain in the readout rate. In the course of the upgrade, we also switched most of the detector control system to using the distributed control system EPICS. For the upgraded control system, some new tools were developed to make full use of the capabilities of this decentralised slow control and monitoring system. The poster presents some of the major contributions to this project.

  17. Upgrade of the CMS hardron calorimeter for an upgraded LHC

    OpenAIRE

    Anderson, Jake

    2012-01-01

    The CMS barrel and endcap hadron calorimeters (Hcal) upgrading the current photo-sensors are hybrid photodiodes (HPDs) to meet the demands of the upgraded luminosity of the LHC. A key aspect of the Hcal upgrade is to add longitudinal segmentation to improve background rejection, energy resolution, and electron isolation at L1 trigger. The increased segmentation can be achieved by replacing the HPD's with multi-pixel Geiger-mode avalanche photodiodes. The upgraded electron...

  18. Instrumentation and control doctrine for VVER upgrading

    International Nuclear Information System (INIS)

    Pernette, R.; Cucciniello, J.; Trebot, R.

    1997-01-01

    The main results are reported of analyses carried out on the WWER-400 and WWER-1000 series, and the reasons are summed up underlying the decision to establish a policy of WWER instrumentation and control upgrading. It is shown that such a policy forms a key stage in any upgrading project and contributes to the improvement of reactor safety at several levels: it helps to optimize the integration of safety requirements; it makes it easier to achieve a high level of automation and a better man-machine interaction; it should raise the culture of reactor safety. Four annexes demonstrate the factual fundamentals and structure of such a policy. (A.K.)

  19. AliPDU Package Upgrade

    CERN Document Server

    "Martin, Michael

    2015-01-01

    "AliPDU Package" is a set of script, panels, and datapoints designed in WinCC to manage and monitor PDU's. PDU is an essential component in the data center, in order to make data center working properly through the monitoring of power distribution and environmental condition of the data center. In this project "AliPDU Package" is upgraded so it can be used to monitor environmental condition of data center using PDU's and external environmental sensor connected to PDU.

  20. AliPDU Package Upgrade

    CERN Document Server

    Martin, Michael

    2015-01-01

    AliPDU Package is a set of script, panels, and datapoints designed in WinCC to manage and monitor PDU's. PDU is an essential component in the data center, in order to make data center working properly through the monitoring of power distribution and environmental condition of the data center. In this project "AliPDU Package" is upgraded so it can be used to monitor environmental condition of data center using PDU's and external environmental sensor connected to PDU.

  1. Development of Reactor Protection System (RPS) in Reactor Digital Instrumentation and Control System (ReDICS)

    International Nuclear Information System (INIS)

    Mohd Khairulezwan Abdul Manan; Mohd Sabri Minhat; Ridzuan Abdul Mutalib

    2013-01-01

    RTP Research Reactor are in the process upgraded from analogue control console system to a digital control console system . Upgrade process requires a statistical study to improve safety during reactor operation. RPS was developed to meet the needs of operational safety and at the same time comply with the guidelines set by the IAEA. RPS is in analog and hardware with industry standard interfaced with digital DAC (Data Acquisition and Control) and OWS (Operator Work Station). (author)

  2. Status of the CMS Phase I pixel detector upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Spannagel, S., E-mail: simon.spannagel@desy.de

    2016-09-21

    A new pixel detector for the CMS experiment is being built, owing to the instantaneous luminosities anticipated for the Phase I Upgrade of the LHC. The new CMS pixel detector provides four-hit tracking while featuring a significantly reduced material budget as well as new cooling and powering schemes. A new front-end readout chip mitigates buffering and bandwidth limitations, and comprises a low-threshold comparator. These improvements allow the new pixel detector to sustain and improve the efficiency of the current pixel tracker at the increased requirements imposed by high luminosities and pile-up. This contribution gives an overview of the design of the upgraded pixel detector and the status of the upgrade project, and presents test beam performance measurements of the production read-out chip.

  3. Status of the CMS Phase I Pixel Detector Upgrade

    CERN Document Server

    Spannagel, Simon

    2016-09-21

    A new pixel detector for the CMS experiment is being built, owing to the instantaneous luminosities anticipated for the Phase~I Upgrade of the LHC. The new CMS pixel detector provides four-hit tracking while featuring a significantly reduced material budget as well as new cooling and powering schemes. A new front-end readout chip mitigates buffering and bandwidth limitations, and comprises a low-threshold comparator. These improvements allow the new pixel detector to sustain and improve the efficiency of the current pixel tracker at the increased requirements imposed by high luminosities and pile-up. This contribution gives an overview of the design of the upgraded pixel detector and the status of the upgrade project, and presents test beam performance measurements of the production read-out chip.

  4. Government-to-business: the Brazilian Public Digital Bookkeeping System (Sped) and the eSocial Project

    OpenAIRE

    Ramos Junior, Helio Santiago; Galiotto, Simone

    2014-01-01

    This paper presents some initiatives of government-to-business in Brazil: The Sped and its project called eSocial. The Sped Fiscal is the Brazilian Public Digital Bookkeeping System and it can be considered an innovation in the relation between the government and the corporate taxpayers, especially in the informatization area. In this research, we explain how it works and its regulatory legislation. After that, we show some benefits of this system. The eSocial Project is the Digital Bookkeepi...

  5. Applying EVM principles to Tevatron Beam Position Monitor Project

    International Nuclear Information System (INIS)

    Banerjee, Bakul

    2005-01-01

    At Fermi National Accelerator Laboratory (Fermilab), the Tevatron high energy particle collider must meet the increasing scientific demand of higher beam luminosity. To achieve this higher luminosity goal, U. S. Department of Energy (DOE) sponsored a major upgrade of capabilities of Fermilab's accelerator complex that spans five years and costs over fifty million dollars. Tevatron Beam Position Monitor (BPM) system upgrade is a part of this project, generally called RunII upgrade project. Since the purpose of the Tevatron collider is to detect the smashing of proton and anti-protons orbiting the circular accelerator in opposite directions, capability to detect positions of both protons and antiprotons at a high resolution level is a desirable functionality of the monitoring system. The original system was installed during early 1980s, along with the original construction of the Tevatron. However, electronic technology available in 1980s did not allow for the detection of significantly smaller resolution of antiprotons. The objective of the upgrade project is to replace the existing BPM system with a new system utilizing capabilities of modern electronics enhanced by a front-end software driven by a real-time operating software. The new BPM system is designed to detect both protons and antiprotons with increased resolution of up to an order of magnitude. The new system is capable of maintaining a very high-level of data integrity and system reliability. The system consists of 27 VME crates installed at 27 service buildings around the Tevatron ring servicing 236 beam position monitors placed underground, inside the accelerator tunnel. Each crate consists of a single Timing Generator Fanout module, custom made by Fermilab staff, one MVME processor card running VxWorks 5.5, multiple Echotek Digital Receiver boards complimented by custom made Filter Board. The VxWorks based front-end software communicates with the Main Accelerator Control software via a special

  6. Digital x-ray tomosynthesis with interpolated projection data for thin slab objects

    Science.gov (United States)

    Ha, S.; Yun, J.; Kim, H. K.

    2017-11-01

    In relation with a thin slab-object inspection, we propose a digital tomosynthesis reconstruction with fewer numbers of measured projections in combinations with additional virtual projections, which are produced by interpolating the measured projections. Hence we can reconstruct tomographic images with less few-view artifacts. The projection interpolation assumes that variations in cone-beam ray path-lengths through an object are negligible and the object is rigid. The interpolation is performed in the projection-space domain. Pixel values in the interpolated projection are the weighted sum of pixel values of the measured projections considering their projection angles. The experimental simulation shows that the proposed method can enhance the contrast-to-noise performance in reconstructed images while sacrificing the spatial resolving power.

  7. [Chinese medicine industry 4.0:advancing digital pharmaceutical manufacture toward intelligent pharmaceutical manufacture].

    Science.gov (United States)

    Cheng, Yi-Yu; Qu, Hai-Bin; Zhang, Bo-Li

    2016-01-01

    A perspective analysis on the technological innovation in pharmaceutical engineering of Chinese medicine unveils a vision on "Future Factory" of Chinese medicine industry in mind. The strategy as well as the technical roadmap of "Chinese medicine industry 4.0" is proposed, with the projection of related core technology system. It is clarified that the technical development path of Chinese medicine industry from digital manufacture to intelligent manufacture. On the basis of precisely defining technical terms such as process control, on-line detection and process quality monitoring for Chinese medicine manufacture, the technical concepts and characteristics of intelligent pharmaceutical manufacture as well as digital pharmaceutical manufacture are elaborated. Promoting wide applications of digital manufacturing technology of Chinese medicine is strongly recommended. Through completely informationized manufacturing processes and multi-discipline cluster innovation, intelligent manufacturing technology of Chinese medicine should be developed, which would provide a new driving force for Chinese medicine industry in technology upgrade, product quality enhancement and efficiency improvement. Copyright© by the Chinese Pharmaceutical Association.

  8. The Arabic Diatessaron Project: Digitalizing, Encoding, Lemmatization

    Directory of Open Access Journals (Sweden)

    Giuliano Lancioni

    2016-04-01

    Full Text Available The Arabic Diatessaron Project (henceforth ADP is an international research project in Digital Humanities that aims to collect, digitalise and encode all known manuscripts of the Arabic Diatessaron (henceforth AD, a text that has been relatively neglected in scholarly research. ADP’s final goal is to provide a number of tools that can enable scholars to effectively query, compare and investigate all known variants of the text that will be encoded as far as possible in compliance with the Text Encoding Initiative (TEI guidelines. The paper addresses a number of issues involved in the process of digitalising manuscripts included in the two existing editions (Ciasca 1888 and Marmardji 1935, adding variants in unedited manuscripts, encoding and lemmatising the text. Issues involved in the design of the ADP include presentation of variants, choice of the standard text, applicability of TEI guidelines, automatic translation between different encodings, cross-edition concordances and principles of lemmatisation.

  9. FRIGG '95. ABB Atom's upgraded T/H loop

    International Nuclear Information System (INIS)

    Noren, T.

    1995-01-01

    The FRIGG '95 project is an upgrading and modernization of the FRIGG loop, ABB Atom's fuel test rig with BWR operating conditions. The current FRIGG loop with test section and heater rods is described, together with the modifications involved in the FRIGG '95 project, including the new unique tomographic void measuring system to be installed. Finally CFD (Computational Fluid Dynamics) is introduced. (orig) (8 refs., 10 figs.)

  10. Playing with the team: The Development of Communities of Practice in a Digital Storytelling Project

    Directory of Open Access Journals (Sweden)

    Peter John Westman

    2012-12-01

    Full Text Available Since its emergence in the early 1990's, digital storytelling has been variouslyidentified as a new media practice, a consumer and community-led movement,and a textual system. However, given its relative nascent status, there remainsthe need for further academic research focusing on the different forms it hasassumed. During the spring/summer of 2011, I conducted an examination ofTaking the Field (TTF, a digital storytelling project that aims to celebrategrassroots cricket in the UK through the construction of stories by village andcounty-level clubs. In contrast to most previous projects that aim to have theparticipants “speak” by constructing their own stories, TTF stories are researchedand constructed by project staff with the assistance of the clubs.My research centers on the experiences of two clubs in the project, Blaina CC andSpondon CC, through interviews and elicitation techniques with club andcommunity members using the completed stories and the artifacts used in theirconstruction. Through the theoretical framework of Gell's anthropology of art, Iconsider how digital stories act as objects that mediate social agency during theircreation and how the structure of this type of project contributes to the formationof communities of practice in the 'performance' of collective identity.

  11. The emergence of business model for digital innovation projects without predetermined usage and market potential

    OpenAIRE

    Antonopoulou, Katerina; Nandhakumar, Joe; Begkos, Christos

    2016-01-01

    In this paper we explore the emergence of business model for digital innovation projects without predetermined usage and uncertain market potential. We studied a firm, which was producing and launching digital platforms for managing organizational operations. Drawing on a case study of developing this digital platform, we identified three recurring calculative and narrative practices: ideating; concocting; aligning. We argue that through these practices various epistemic objects (which we cal...

  12. Upgrades for Offline Data Quality Monitoring at ATLAS

    CERN Document Server

    Joergensen, M D; The ATLAS collaboration; Frost, J

    2013-01-01

    The ATLAS offline data quality monitoring infrastructure functioned successfully during the 2010-2012 run of the LHC. During the 2013-14 long shutdown, a large number of upgrades will be made in response to user needs and to take advantage of new technologies - for example, deploying richer web applications, improving dynamic visualization of data, streamlining configuration, and moving applications to a common messaging bus. Additionally consolidation and integration activities will occur. We will discuss lessons learned so far and the progress of the upgrade project, as well as associated improvements to the data reconstruction and processing chain.

  13. FERMILAB SWITCHYARD RESONANT BEAM POSITION MONITOR ELECTRONICS UPGRADE RESULTS

    Energy Technology Data Exchange (ETDEWEB)

    Petersen, T. [Fermilab; Diamond, J. [Fermilab; Liu, N. [Fermilab; Prieto, P. S. [Fermilab; Slimmer, D. [Fermilab; Watts, A. [Fermilab

    2016-10-12

    The readout electronics for the resonant beam position monitors (BPMs) in the Fermilab Switchyard (SY) have been upgraded, utilizing a low noise amplifier transition board and Fermilab designed digitizer boards. The stripline BPMs are estimated to have an average signal output of between -110 dBm and -80 dBm, with an estimated peak output of -70 dBm. The external resonant circuit is tuned to the SY machine frequency of 53.10348 MHz. Both the digitizer and transition boards have variable gain in order to accommodate the large dynamic range and irregularity of the resonant extraction spill. These BPMs will aid in auto-tuning of the SY beamline as well as enabling operators to monitor beam position through the spill.

  14. Upgrade of the ATLAS Hadronic Tile Calorimeter for the High Luminosity LHC

    CERN Document Server

    Hildebrand, Kevin; The ATLAS collaboration

    2017-01-01

    The Tile Calorimeter is the hadronic calorimeter covering the central region of the ATLAS detector at the Large Hadron Collider. It is a scintillator-steel sampling calorimeter read out via wavelength shifting fibers coupled to photomultiplier tubes (PMT). . The Large Hadron Collider (LHC) has envisaged a series of upgrades towards a High Luminosity LHC (HL-LHC) delivering five times the LHC nominal instantaneous luminosity. The ATLAS Phase II upgrade (2024-2025) will accommodate the upgrade of the detector and data acquisition system for the HL-LHC. In particular, TileCal will undergo a major replacement of its on- and off-detector electronics. In the new architecture, all signals will be digitized and sent to the first level of trigger at the rate of 40 MHz. This will provide better precision of the calorimeter signals used by the trigger system and will allow the development of more complex trigger algorithms. Changes to the electronics will also contribute to the reliability and redundancy of the system. ...

  15. Thermal System Upgrade of the Space Environment Simulation Test Chamber

    Science.gov (United States)

    Desai, Ashok B.

    1997-01-01

    The paper deals with the refurbishing and upgrade of the thermal system for the existing thermal vacuum test facility, the Space Environment Simulator, at NASA's Goddard Space Flight Center. The chamber is the largest such facility at the center. This upgrade is the third phase of the long range upgrade of the chamber that has been underway for last few years. The first phase dealt with its vacuum system, the second phase involved the GHe subsystem. The paper describes the considerations of design philosophy options for the thermal system; approaches taken and methodology applied, in the evaluation of the remaining "life" in the chamber shrouds and related equipment by conducting special tests and studies; feasibility and extent of automation, using computer interfaces and Programmable Logic Controllers in the control system and finally, matching the old components to the new ones into an integrated, highly reliable and cost effective thermal system for the facility. This is a multi-year project just started and the paper deals mainly with the plans and approaches to implement the project successfully within schedule and costs.

  16. Advanced Equalization Techniques for Digital Coherent Optical Receivers

    DEFF Research Database (Denmark)

    Arlunno, Valeria

    approach based on joint encoding and equalization technique, known as Turbo Equalization (TE). This scheme is demonstrated to be powerful in transmission impairments mitigation for high order modulations formats, such as 16 Quadrature Amplitude Modulation (QAM), considered a key technology for high speed...... a lower complexity convolutional code compared to state of the art reports. Furthermore, in order to fulfill the strict constrains of spectral efficiency, this thesis shows the application of digital adaptive equalizer for reconfigurable and Ultra Dense Wavelength Division Multiplexing (U......-over-Fiber (RoF) transmission system for a stand alone case and mixed modulation mixed bit rates transmission scheme. In conclusion, this PhD thesis demonstrates the flexibility, upgrade-ability and robustness offered by rising advanced digital signal processing techniques, for future high-speed, high...

  17. The Security Research of Digital Library Network

    Science.gov (United States)

    Zhang, Xin; Song, Ding-Li; Yan, Shu

    Digital library is a self-development needs for the modern library to meet the development requirements of the times, changing the way services and so on. digital library from the hardware, technology, management and other aspects to objective analysis of the factors of threats to digital library network security. We should face up the problems of digital library network security: digital library network hardware are "not hard", the technology of digital library is relatively lag, digital library management system is imperfect and other problems; the government should take active measures to ensure that the library funding, to enhance the level of network hardware, to upgrade LAN and prevention technology, to improve network control technology, network monitoring technology; to strengthen safety management concepts, to prefect the safety management system; and to improve the level of security management modernization for digital library.

  18. Upgrading instrumentation and control systems for plant safety and operation

    International Nuclear Information System (INIS)

    Martin, M.; Prehler, H.J.; Schramm, W.

    1997-01-01

    Upgrading the electrical systems and instrumentation and control systems has become increasingly more important in the past few years for nuclear power plants currently in operation. As the requirements to be met in terms of plant safety and availability have become more stringent in the past few years, Western plants built in the sixties and seventies have been the subject of manifold backfitting and upgrading measures in the past. In the meantime, however, various nuclear power plants are facing much more thorough upgrading phases because of the difficulties in obtaining spare parts for older equipment systems. As digital technology has become widespread in many areas because of its advantages, and as applications are continuously expanding, conventional equipment and systems are losing more and more ground as a consequence of decreasing demand. Merely because of the pronounced decline in demand for conventional electronic components it is possible for equipment manufacturers to guarantee spare parts deliveries for older systems only for specific future periods of time. In addition, one-off manufacture entails high costs in purchases of spare parts. As a consequence of current thinking more and more focusing on availability and economy, upgrading of electrical systems and instrumentation and control systems is becoming a more and more topical question, for older plants even to ensure completion of full service life. (orig.) [de

  19. APS Storage Ring Monopulse RF BPM Upgrade

    Science.gov (United States)

    Lill, R.; Pietryla, A.; Norum, E.; Lenkszus, F.

    2004-11-01

    The Advanced Photon Source (APS) is a third-generation synchrotron light source in its ninth year of operation. The storage ring monopulse radio frequency (rf) beam position monitor (BPM) was designed to measure single-turn and multi-turn beam positions for operations and machine physics studies. Many of the components used in the original design are obsolete and costly to replace. In this paper we present a proposal to upgrade the monopulse rf BPMs in which the existing system hardware is repartitioned and the aging data acquisition system is replaced. By replacing only the data acquisition system, we will demonstrate a cost-effective approach to improved beam stability, reliability, and enhanced postmortem capabilities. An eight-channel ADC/digitizer VXI board with sampling rate of up to 105 MHz (per channel) and 14-bit resolution coupled with a field-programmable gate array and embedded central processing will provide the flexibility to revitalize this system for another decade of operation. We will discuss the upgrade system specifications, design, and prototype test results.

  20. Fermilab Linac Upgrade Conceptual Design: Revision 3

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    1989-07-01

    The goal of the Tevatron Collider Upgrade program is to improve the Collider luminosity and the fixed-target intensity. The Linac portion of this project will increase the energy of the existing 200- MeV linac to 400 MeV in order to reduce beam emittance degradation in the Booster.

  1. Human Factors Engineering Aspects of Modifications in Control Room Modernization

    Energy Technology Data Exchange (ETDEWEB)

    Hugo, Jacques [Idaho National Lab. (INL), Idaho Falls, ID (United States); Clefton, Gordon [Idaho National Lab. (INL), Idaho Falls, ID (United States); Joe, Jeffrey [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2017-06-01

    This report describes the basic aspects of control room modernization projects in the U.S. nuclear industry and the need for supplementary guidance on the integration of human factors considerations into the licensing and regulatory aspects of digital upgrades. The report pays specific attention to the integration of principles described in NUREG-0711 (Human Factors Engineering Program Review Model) and how supplementary guidance can help to raise general awareness in the industry regarding the complexities of control room modernization projects created by many interdependent regulations, standards and guidelines. The report also describes how human factors engineering principles and methods provided by various resources and international standards can help in navigating through the process of licensing digital upgrades. In particular, the integration of human factors engineering guidance and requirements into the process of licensing digital upgrades can help reduce uncertainty related to development of technical bases for digital upgrades that will avoid the introduction of new failure modes.

  2. 3D digital dynamic management of maintenance projects for nuclear power plant

    International Nuclear Information System (INIS)

    Wang Baizhong; Luo Yalin; Fang Hao; Ma Li; Zhang Jie; Wang Ruobing; Xie Min

    2005-01-01

    The whole process for the application of digital plant technique in the equipment transport in reactor building and the dynamic management of the spatial arrangement in Daya Bay Nuclear Power Station was introduced in the paper. The establishment of 3D digital Daya Bay plant, and the method and procedure to apply it in the nuclear power plant maintenance project have been discussed. This project utilizes the outer database to preserve the maintenance status of equipments, and avoids the damage or changing of the original 3D final model. Based on the maintenance procedure, the spatial arrangement and schedule for the maintenance of nuclear power station have been simulated and optimized for the whole process. This technique can simulate and optimize the arrangement and spatial arrangement for maintenance in limited space. It has been applied successfully in the reactor vessel head replacement for Unit 2 of Daya Bay NPP to shorten the time for key routes and the total time of this project by 16 hours and 92.5 hours, respectively. (author)

  3. 3DEXPERIENCE: a digital platform to optimize nuclear projects

    International Nuclear Information System (INIS)

    Grand, T.; Le Ngoc

    2016-01-01

    Dassault Systemes has developed a digital platform 3DEXPERIENCE that enables all the enterprises working on a project to use common software and built databases in a collaborative environment. Now It is possible to simulate all the construction steps of a reactor and 3DEXPERIENCE is already used in the Chinese and Russian nuclear industries. For instance 3DEXPERIENCE allows the testing of different construction scenarios in order to find the best one to cope with the delay of a supplier for a component. The Russian feedback experience shows an average 15% gain in engineering man-hours for the construction of a reactor and up to 25% for its commissioning. The use of 3DEXPERIENCE for the dismantling of ancient facilities is more difficult since in most cases it does not exist a digital description of the facility. (A.C.)

  4. Development of the ATLAS FE-I4 pixel readout IC for b-layer Upgrade and Super-LHC

    CERN Document Server

    Karagounis, M

    2008-01-01

    Motivated by the upcoming upgrade of the ATLAS hybrid pixel detector, a new Front-End (FE) IC is being developed in a 130nm technology to face the tightened requirements of the upgraded pixel system. The main design goals are the reduction of material and a decrease in power consumption combined with the capability to handle the higher hit rates that will result from the upgraded machine. New technology features like the higher integration density for digital circuits, better radiation tolerance and Triple-Well transistors are used for optimization and the implementation of new concepts. A description of the ongoing design work is given, focusing more on the analog part and peripheral design blocks.

  5. Particle combinations in the LHCb Upgrade trigger

    CERN Document Server

    Zhao, Fanyi

    2017-01-01

    The LHCb experiment will be upgraded during long shutdown II (2018-2020) to process inelastic proton-proton collisions at 30MHz in a software application and run at a higher instantaneous luminosity of $2\\times 10^{33}cm^{−2}s^{−1}$. Each of these collisions will contain substantially more proton-proton interactions and charged particles. It is important to identify the decay vertices of heavy-flavour hadrons produced by the primary proton-proton interaction in an efficient, CPU-performant manner. In this project, I will learn about the LHCb trigger and experimental programme and investigate alternative models for reconstructing these vertices, which may scale more efficiently to the upgraded trigger conditions than the current model.

  6. Upgrades to the ISIS moderator configuration

    International Nuclear Information System (INIS)

    Taylor, A.D.

    1989-01-01

    The current ISIS moderator configuration, was designed in 1980 to provide a flexible set of beams for a hypothetical instrument suite. The use of fluid moderators at three different temperatures offering six faces to the instruments, has proved to be effective. In this paper we discuss an upgrade of these moderators in the light of the current and projected instrument configuration. (author)

  7. Hardware and software maintenance strategies for upgrading vintage computers

    International Nuclear Information System (INIS)

    Wang, B.C.; Buijs, W.J.; Banting, R.D.

    1992-01-01

    The paper focuses on the maintenance of the computer hardware and software for digital control computers (DCC). Specific design and problems related to various maintenance strategies are reviewed. A foundation was required for a reliable computer maintenance and upgrading program to provide operation of the DCC with high availability and reliability for 40 years. This involved a carefully planned and executed maintenance and upgrading program, involving complementary hardware and software strategies. The computer system was designed on a modular basis, with large sections easily replaceable, to facilitate maintenance and improve availability of the system. Advances in computer hardware have made it possible to replace DCC peripheral devices with reliable, inexpensive, and widely available components from PC-based systems (PC = personal computer). By providing a high speed link from the DCC to a PC, it is now possible to use many commercial software packages to process data from the plant. 1 fig

  8. Defining a Self-Evaluation Digital Literacy Framework for Secondary Educators: The DigiLit Leicester Project

    Science.gov (United States)

    Hall, Richard; Atkins, Lucy; Fraser, Josie

    2014-01-01

    Despite the growing interest in digital literacy within educational policy, guidance for secondary educators in terms of how digital literacy translates into the classroom is lacking. As a result, many teachers feel ill-prepared to support their learners in using technology effectively. The DigiLit Leicester project created an infrastructure for…

  9. THE BENEFITS OF THE E-LEARNING AGRICULTURAL PROJECT KISSANKERALA TO DIGITAL IMMIGRANTS AND DIGITAL NATIVES

    Directory of Open Access Journals (Sweden)

    Manoj ROY. V.

    2013-04-01

    Full Text Available In recent times Information and Communication Technology (ICT has been able to make inroads into the ways information is disseminated among those involved in direct farming and farming related enterprises. This paper arose from a two-year study of the KissanKerala, the e-learning project underway in Kerala, a small state in India. It is more conspicuous when we learn that the KissanKerala project is able to disseminate agricultural information also among digital immigrants. Since 2003, the KissanKerala has been providing advisory services to the farming community in Kerala using a combination of technologies. Salient features of the project are discussed. Noteworthy are its interactive web portal and the online agri-video channel that uses the video sharing platform of YouTube. In this paper, we look at the e-learning strategies adopted; virtual learning environments created and also discuss participative tools used for communication. We have also made an impact-study of the project with a large number of beneficiaries. We learn that the Kissan Kerala is one of the most successful learning projects undertaken in distance mode in India.

  10. DIAS Project: The establishment of a European digital upper atmosphere server

    Science.gov (United States)

    Belehaki, A.; Cander, Lj.; Zolesi, B.; Bremer, J.; Juren, C.; Stanislawska, I.; Dialetis, D.; Hatzopoulos, M.

    2005-08-01

    The main objective of DIAS (European Digital Upper Atmosphere Server) project is to develop a pan-European digital data collection on the state of the upper atmosphere, based on real-time information and historical data collections provided by most operating ionospheric stations in Europe. A DIAS system will distribute information required by various groups of users for the specification of upper atmospheric conditions over Europe suitable for nowcasting and forecasting purposes. The successful operation of the DIAS system will lead to the development of new European added-value products and services, to the effective use of observational data in operational applications and consequently to the expansion of the relevant European market.

  11. Upgrading of oil palm wastes by radiation processing - project review

    International Nuclear Information System (INIS)

    Nahrul Khair Alang Md Rashid

    1998-01-01

    Early works on oil palm waste treatment at MINT started in 1984 with the objective of degrading EFB (Empty Fruit Bunches) by radiation. This idea was shared by JAERI that adopted the research project with MINT in 1986 under the Japanese Science and Technology Agency (STA) programme. The results of these preliminary works show that EFB can be degraded using gamma radiation at a dose of ranging from 500 to 1000 kGy - 50 to 100 times higher than what is considered to be the economic dose. It is generally accepted that the economics of radiation treatment process could only be realised if the treatment dose can be kept below 10 kGy, which was incidentally, during the course of this early works, found to be the pasteurisation dose for oil palm by - products. With these information, MINT and JAERI agreed to pursue further research in this area and formulated a bilateral research co-operation in radiation pasteurisation of EFB and subsequent degradation by cellulolytic fungi or mushrooms. The research has the objective of upgrading EFB, which was not considered as suitable for feed due to its known physical properties as coarse and highly fibrous, to animal feed as well as substrate for mushroom cultivation and enzyme production. In addition to the desire to provide an environment friendly method for waste disposal to a growing industry, the possibility of catalysing the development of livestock industry by commercial farming in the process is another motivation for this project. Malaysia is estimated to be only about 40% self-sufficient in beef production. Thus there is great opportunity for the growth and expansion of this industry in Malaysia. However, growth in ruminant population should not result in the alienation of land for pastures. Among the reasons for the lack of interest in livestock production through commercial farming is the unavailability of local feed material which could be cheaper than imported feed grains, particularly maize. Feed is one the main cost

  12. Upgrading of oil palm wastes by radiation processing - project review

    Energy Technology Data Exchange (ETDEWEB)

    Alang Md Rashid, Nahrul Khair [Malaysian Institute for Nuclear Technology Research (MINT), Bangi (Malaysia)

    1998-07-01

    Early works on oil palm waste treatment at MINT started in 1984 with the objective of degrading EFB (Empty Fruit Bunches) by radiation. This idea was shared by JAERI that adopted the research project with MINT in 1986 under the Japanese Science and Technology Agency (STA) programme. The results of these preliminary works show that EFB can be degraded using gamma radiation at a dose of ranging from 500 to 1000 kGy - 50 to 100 times higher than what is considered to be the economic dose. It is generally accepted that the economics of radiation treatment process could only be realised if the treatment dose can be kept below 10 kGy, which was incidentally, during the course of this early works, found to be the pasteurisationdose for oil palm by - products. With these information, MINT and JAERI agreed to pursue further research in this area and formulated a bilateral research co-operation in radiation pasteurisation of EFB and subsequent degradation by cellulolytic fungi or mushrooms. The research has the objective of upgrading EFB, which was not considered as suitable for feed due to its known physical properties as coarse and highly fibrous, to animal feed as well as substrate for mushroom cultivation and enzyme production. In addition to the desire to provide an environment friendly method for waste disposal to a growing industry, the possibility of catalysing the development of livestock industry by commercial farming in the process is another motivation for this project. Malaysia is estimated to be only about 40% self-sufficient in beef production. Thus there is great opportunity for the growth and expansion of this industry in Malaysia. However, growth in ruminant population should not result in the alienation of land for pastures. Among the reasons for the lack of interest in livestock production through commercial farming is the unavailability of local feed material which could be cheaper than imported feed grains, particularly maize. Feed is one the main cost

  13. Art and Aging: Digital Projects for Individuals With Dementia

    Directory of Open Access Journals (Sweden)

    Elyssa Twedt

    2014-03-01

    Full Text Available In action teaching, assignments are created that simultaneously benefit students and society by directly connecting classroom material to a community intervention. We designed an entire course rooted in the principles of action teaching in which students facilitated the positive effects of art, nature, and music on the well-being of individuals diagnosed with dementia. Groups of three students worked with a local elderly couple, one member of whom had dementia, to create multimedia digital projects (e.g., online scrapbooks, interactive DVDs involving experiences with art or nature tailored to the needs of their specific community partners. Students met weekly with their assigned couple to discuss their families’ interests, goals for the project, and to obtain feedback on the impact of their project on their families’ well-being. Through these weekly meetings, students took an iterative approach to designing and improving their final projects, applying material learned through classroom lectures to their projects. In this field experience, students went beyond traditional lecture learning by developing a customized project that promoted the well-being of someone experiencing dementia. This course fostered values of citizenship, developed students’ research skills, and highlighted the reciprocal nature between knowledge learned in the classroom and knowledge acquired through real-world experiences.

  14. Upgrading of Sergiev Posad department of Moscow NPO Radon

    International Nuclear Information System (INIS)

    Debieve, Pierre; Delecaut, Gregory; Vanleeuw, Daniel

    2007-01-01

    Available in abstract form only. Full text of publication follows: BELGATOM and IRE Consortium has been awarded by the European Commission end of 2005 to conduct a project entitled 'Upgrading of Sergiev Posad Department of Moscow NPO Radon and the assessment of the radiological impact in the area nearby'. The main aims to achieve in the frame of this Europe-aid Project are: - Improvement of the performance and the safety level of the present radwaste management system, taking into account the additional waste expected from the Kurchatov Institute rehabilitation and from the forecast decommissioning of Research Reactors on the territory of Moscow. - Basic design and assistance for the procurement of upgrading equipment related to: - radwaste sorting and pretreatment - replacement of the hydraulic system of the existing super-compactor - characterisation system for radwaste 'Support for preparing the PSAR and PEIAR for new licensing' Assessment of the radiological impact in an area of 50 km radius around Sergiev Posad Department. - The initial duration of this Project is 3 years, starting beginning of 2006. This paper describes the difficulties encountered to start and implement the Project and its status at the half of the planned time schedule. (authors)

  15. ATLAS Detector Upgrade Prospects

    CERN Document Server

    Dobre, Monica; The ATLAS collaboration

    2016-01-01

    After the successful operation at the center-of-mass energies of 7 and 8 TeV in 2010 - 2012, the LHC is ramped up and successfully took data at the center-of-mass energies of 13 TeV in 2015. Meanwhile, plans are actively advancing for a series of upgrades of the accelerator, culminating roughly ten years from now in the high-luminosity LHC (HL-LHC) project, delivering of the order of five times the LHC nominal instantaneous luminosity along with luminosity leveling. The ultimate goal is to extend the dataset from about few hundred fb−1 expected for LHC running to 3000 fb−1 by around 2035 for ATLAS and CMS. The challenge of coping with the HL-LHC instantaneous and integrated luminosity, along with the associated radiation levels, requires further major changes to the ATLAS detector. The designs are developing rapidly for a new all-silicon tracker, significant upgrades of the calorimeter and muon systems, as well as improved triggers and data acquisition. ATLAS is also examining potential benefits of extens...

  16. ATLAS detector upgrade prospects

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00184940; The ATLAS collaboration

    2017-01-01

    After the successful operation at the centre-of-mass energies of 7 and 8 TeV in 2010-2012, the LHC is ramped up and successfully took data at the centre-of-mass energies of 13 TeV in 2015. Meanwhile, plans are actively advancing for a series of upgrades of the accelerator, culminating roughly ten years from now in the high-luminosity LHC (HL-LHC) project, delivering of the order of five times the LHC nominal instantaneous luminosity along with luminosity levelling. The ultimate goal is to extend the dataset from about few hundred fb$^{-1}$ expected for LHC running to 3000 fb $^{-1}$ by around 2035 for ATLAS and CMS. The challenge of coping with the HL-LHC instantaneous and integrated luminosity, along with the associated radiation levels, requires further major changes to the ATLAS detector. The designs are developing rapidly for a new all-silicon tracker, significant upgrades of the calorimeter and muon systems, as well as improved triggers and data acquisition. ATLAS is also examining potential benefits of ...

  17. Muon Physics at Run-I and its upgrade plan

    Directory of Open Access Journals (Sweden)

    Benekos Nektarios Chr.

    2015-01-01

    Full Text Available The Large Hadron Collider (LHC and its multi-purpose Detector, ATLAS, has been operated successfully at record centre-of-mass energies of 7 and TeV. After this successful LHC Run-1, plans are actively advancing for a series of upgrades, culminating roughly 10 years from now in the high luminosity LHC (HL-LHC project, delivering of order five times the LHC nominal instantaneous luminosity along with luminosity leveling. The final goal is to extend the data set from about few hundred fb−1 expected for LHC running to 3000 fb−1 by around 2030. To cope with the corresponding rate increase, the ATLAS detector needs to be upgraded. The upgrade will proceed in two steps: Phase I in the LHC shutdown 2018/19 and Phase II in 2023-25. The largest of the ATLAS Phase-1 upgrades concerns the replacement of the first muon station of the highrapidity region, the so called New Small Wheel. This configuration copes with the highest rates expected in Phase II and considerably enhances the performance of the forward muon system by adding triggering functionality to the first muon station. Prospects for the ongoing and future data taking are presented. This article presents the main muon physics results from LHC Run-1 based on a total luminosity of 30 fb^-1. Prospects for the ongoing and future data taking are also presented. We will conclude with an update of the status of the project and the steps towards a complete operational system, ready to be installed in ATLAS in 2018/19.

  18. Siemens tasks and activities during gradual upgrading

    International Nuclear Information System (INIS)

    Kuehne, B.

    2001-01-01

    The gradual upgrading of NPP V1 Bohunice constitutes the most extensive reconstruction project to be performed in an operational WWER plant to date. It constitutes a milestone in Siemens co-operation on projects for WWERs to date and is an encouraging example for the successful combination of western and eastern safety cultures. During the runtime of this project Siemens learnt very much about the 'complete function' as well as the details of this WWER plant type. In contrast the Slovakian partners really gained a much better understanding for the western approach to ensure safety, for the most modern safety technology, in particular for instrumentation and control, and last but not least or advanced project management. (author)

  19. Analog Readout and Digitizing System for ATLAS TileCal Demonstrator

    CERN Document Server

    Tang, F; The ATLAS collaboration

    2014-01-01

    The TileCal Demonstrator is a prototype for a future upgrade to the ATLAS hadron calorimeter when the Large Hadron Collider increases luminosity in year 2023 (HL-LHC). It will be used for functionality and performance tests. The Demonstrator has 48 channels of upgraded readout and digitizing electronics and a new digital trigger capability, but is backwards-compatible with the present detector system insofar as it also provides analog trigger signals. The Demonstrator is comprised of 4 identical mechanical mini-drawers, each equipped with up to 12 photomultipliers (PMTs). The on-detector electronics includes 45 Front-End Boards, each serving an individual PMT; 4 Main Boards, each to control and digitize up to 12 PMT signals, and 4 corresponding high-speed Daughter Boards serving as data hubs between on-detector and off-detector electronics. The Demonstrator is fully compatible with the present system, accepting ATLAS triggers, timing and slow control commands for the data acquisition, detector control, and de...

  20. Upgraded readout electronics for the ATLAS LAr Calorimeter at the High Luminosity LHC

    CERN Document Server

    Andeen, T; The ATLAS collaboration

    2012-01-01

    The ATLAS Liquid Argon (LAr) calorimeters produce a total of 182,486 signals which are digitized and processed by the front-end and back-end electronics at every triggered event. In addition, the front-end electronics is summing analog signals to provide coarsely grained energy sums, called trigger towers, to the first-level trigger system, which is optimized for nominal LHC luminosities. However, the pile-up noise expected during the High Luminosity phases of LHC will be increased by factors of 3 to 7. An improved spatial granularity of the trigger primitives is therefore proposed in order to improve the identification performance for trigger signatures, like electrons or photons, at high background ejection rates. For the first upgrade phase [1] in 2018, new digital tower builder boards (sTBB) are being designed to receive higher granularity signals, digitize them on detector and send them via fast optical links to a new digital processing system (DPS). The DPS applies a digital filtering and identifies sig...

  1. Upgrade of the ATLAS Hadronic Tile Calorimeter for the High Luminosity LHC

    Science.gov (United States)

    Tortajada, Ignacio Asensi

    2018-01-01

    The Large Hadron Collider (LHC) has envisaged a series of upgrades towards a High Luminosity LHC (HL-LHC) delivering five times the LHC nominal instantaneous luminosity. The ATLAS Phase II upgrade, in 2024, will accommodate the upgrade of the detector and data acquisition system for the HL-LHC. The Tile Calorimeter (TileCal) will undergo a major replacement of its on- and off-detector electronics. In the new architecture, all signals will be digitized and then transferred directly to the off-detector electronics, where the signals will be reconstructed, stored, and sent to the first level of trigger at the rate of 40 MHz. This will provide better precision of the calorimeter signals used by the trigger system and will allow the development of more complex trigger algorithms. Changes to the electronics will also contribute to the reliability and redundancy of the system. Three different front-end options are presently being investigated for the upgrade, two of them based on ASICs, and a final solution will be chosen after extensive laboratory and test beam studies that are in progress. A hybrid demonstrator module is being developed using the new electronics while conserving compatibility with the current system. The status of the developments will be presented, including results from the several tests with particle beams.

  2. Environmental impact assessment of oilfield upgrades in Bohai Sea

    Science.gov (United States)

    Chen, Ruihui; Xiong, Yanna; Li, Jiao; Li, Xianbo

    2018-02-01

    This paper designed 65 environmental monitoring sites to collect samples and analyze for better evaluating the environmental impact generated by cuttings, mud, produced water with oil and oil pollutions that produced during the upgrading in the Bohai Sea where the oil field 34-1 upgraded. Collecting samples include ocean water, marine life and sediments and test items involve PH, dissolved oxygen (DO), salinity, chemical oxygen demand (COD), phosphate, organic carbon, sulfide, inorganic nitrogen, petroleum, copper (Cu), lead (Pb), zinc (Zn), cadmium (Cd), total chromium (Cr), total mercury (Hg) and arsenic (As). Meanwhile sample sites collect and analyze the abundance and diversity of marine plants and elaborated the environmental impact caused by upgrading renovation project from the aspects of sea water, marine life and marine sediments. Through analysis and comparison we found that seawater quality conform the Ш seawater quality standards, the excessive rate of Cu is 10%, the average diversity index of marine life is 2.34 and evenness is 0.68. Influence range of marine sediments and pollutants of production is within 2.68km and basically has no serious impact in the surrounding sea area. It’s worth nothing that reconstruction project has the risk of oil spilling and protective measures must be prepared.

  3. Cost Model for Digital Curation: Cost of Digital Migration

    DEFF Research Database (Denmark)

    Kejser, Ulla Bøgvad; Nielsen, Anders Bo; Thirifays, Alex

    2009-01-01

    The Danish Ministry of Culture is currently funding a project to set up a model for costing preservation of digital materials held by national cultural heritage institutions. The overall objective of the project is to provide a basis for comparing and estimating future financial requirements...... for digital preservation and to increase cost effectiveness of digital preservation activities. In this study we describe an activity based costing methodology for digital preservation based on the OAIS Reference Model. In order to estimate the cost of digital migrations we have identified cost critical...

  4. How Digital Autoradiography Technique can be useful for D and D projects?

    International Nuclear Information System (INIS)

    Fichet, Pascal; Haudebourg, Raphael

    2016-01-01

    For many stakeholders, it is obvious that radiological characterization is essential for D and D projects and all of them have its own specificities. Different types of techniques have been developed for characterizations not only by destructive methods but also by in situ investigations. Since 2010, the LASE laboratory, in charge of characterizations of different radionuclides that can be found in nuclear wastes, has developed the Digital Autoradiography (DA) technique. Today, DA technique is in routine use commercially for biological researches to obtain images of labelled molecules containing for example H-3, C-14, I-129,... i.e. radionuclides difficult to measure for D and D projects. The needs to investigate these hard to observe radionuclides are one of the R and D subjects for D and D proposed recently and highlighted by OECD. Up to now the R and D projects concerning Digital Autoradiography has been focused on mapping process in buildings under dismantling process and also on sampling procedures being essential before any destructive analysis. New developments are still going on to develop the technique and to modify technologies coming from biological researches. (authors)

  5. Ukraine-Japanese-Swedish project: Upgrading of perimeter protection system at Kharkov Institute of Physics and Technology (KIPT)

    International Nuclear Information System (INIS)

    Mikahaylov, V.; Lapshin, V.; Ek, P.; Flyghed, L.; Nilsson, A.; Ooka, N.; Shimizu, K.; Tanuma, K.

    2001-01-01

    Full text: Since the Ukraine voluntarily accepted the status of a non-nuclear-weapons state and concluded a Safeguards Agreement with the IAEA, the Kharkov Institute of Physics and Technology (KIPT) as a nuclear facility using the nuclear material of category 1, has become a Ukrainian priority object for the international community's efforts to ensure nuclear non-proliferation measures and to bring the existing protection systems to the generally accepted security standards. In March 1996, at the meeting held under the auspices of the IAEA in Kiev, the representatives from Japan, Sweden and the USA agreed to provide technical assistance concerning improvement of the nuclear material accountancy and control and physical protection system (MPC and A) available at KIPT. The Technical Secretariat of the Japan-Ukraine Committee for Co-operation on Reducing Nuclear Weapons and Swedish Nuclear Power Inspectorate undertook to solve the most expensive and labour-consuming task namely, the upgrading of the perimeter protection system at KIPT. This included that the current perimeter system, comprising several kilometers, should be completely replaced. Besides the above-mentioned problem, the upgrading should be carried out with the institute in operation. Thus, it was not allowed to replace the existing protection system by a new one unless KIPT was constantly protected. This required the creation of a new protected zone that to a large extent was occupied by the communication equipment, buildings, trees and other objects interfering with the work. All these difficulties required very comprehensive development of the project design as well as a great deal of flexibility during the implementation of the project. These problems were all successfully resolved thanks to a well working project organization, composed of experts from KIPT, JAERI and ANS, involving the highly qualified Swedish technical experts who played a leading role. In the framework of implementation of the

  6. Implementation of U.S. Department of Energy physical protection upgrades in Lithuania and Uzbekistan

    International Nuclear Information System (INIS)

    Haase, M.; Romesberg, L.; Showalter, R.; Soo Hoo, M.S.; Corey, J.; Engling, E.

    1996-01-01

    Since 1994, the U.S. Department of Energy (DOE) has provided cooperative assistance to the non-nuclear weapons states of the Former Soviet Union. This effort, within DOE's program of Material Protection, Control, and Accounting (MPC ampersand A), identified the Institute of Nuclear Physics (INP) in Uzbekistan and the Ignalina Nuclear Power Plant (INPP) in Lithuania as sites for cooperative MPC ampersand A projects. The INP, located just outside of Tashkent, is the site of a 10-megawatt WWR-SM research reactor. This reactor is expected to remain operational as a major nuclear research and isotope production reactor for Central Asia. The INPP, located 100 kilometers northeast of the capital city of Vilnius, consists of two Russian-made RBMK reactors with a combined power output of 3,000 megawatts (electric). This power plant has been the subject of international safety and security concerns, which prompted DOE's cooperative assistance effort. This paper describes U.S. progress in a multi-national effort directed at implementing physical protection upgrades in Lithuania and Uzbekistan. The upgrades agreed upon between DOE and the INP and between DOE and the INPP have been designed to interface with upgrades being implemented by other donor countries. DOE/INPP upgrade projects include providing training on U.S. approaches to physical protection, access control through the main vehicle portal, a hardened central alarm station, and improved guard force communications. DOE/INP upgrade projects in Uzbekistan include an access control system, a hardened fresh fuel storage vault, an interior intrusion detection and assessment system, and an integrated alarm display and assessment system

  7. Radiation hardness of two CMOS prototypes for the ATLAS HL-LHC upgrade project

    CERN Document Server

    Huffman, B T; Arndt, K; Bates, R; Benoit, M; Di Bello, F; Blue, A; Bortoletto, D; Buckland, M; Buttar, C; Caragiulo, P; Das, D; Dopke, J; Dragone, A; Ehrler, F; Fadeyev, V; Galloway, Z; Grabas, H; Gregor, I M; Grenier, P; Grillo, A; Hoeferkamp, M; Hommels, L B A; John, J; Kanisauskas, K; Kenney, C; Kramberger, J; Liang, Z; Mandic, I; Maneuski, D; Martinez-McKinney, F; McMahon, S; Meng, L; Mikuž, M; Muenstermann, D; Nickerson, R; Peric, I; Phillips, P; Plackett, R; Rubbo, F; Segal, J; Seidel, S; Seiden, A; Shipsey, I; Song, W; Stanitzki, M; Su, D; Tamma, C; Turchetta, R; Vigani, L; olk, J; Wang, R; Warren, M; Wilson, F; Worm, S; Xiu, Q; Zhang, J; Zhu, H

    2016-01-01

    The LHC luminosity upgrade, known as the High Luminosity LHC (HL-LHC), will require the replacement of the existing silicon strip tracker and the transistion radiation tracker. Although a baseline design for this tracker exists the ATLAS collaboration and other non-ATLAS groups are exploring the feasibility of using CMOS Monolithic Active Pixel Sensors (MAPS) which would be arranged in a strip-like fashion and would take advantage of the service and support structure already being developed for the upgrade. Two test devices made with theAMSH35 process (a High voltage or HV CMOS process) have been subjected to various radiation environments and have performed well. The results of these tests are presented in this paper.

  8. Upgrade of the ATLAS hadronic Tile calorimeter for the High luminosity LHC

    CERN Document Server

    Asensi Tortajada, Ignacio; The ATLAS collaboration

    2017-01-01

    The Tile Calorimeter (TileCal) is the hadronic calorimeter covering the central region of the ATLAS detector at the LHC. It is a sampling calorimeter consisting of alternating thin steel plates and scintillating tiles. Wavelength shifting fibers coupled to the tiles collect the produced light and are read out by photomultiplier tubes. An analog sum of the processed signal of several photomultipliers serves as input to the first level of trigger. Photomultiplier signals are then digitized at 40 MHz and stored on detector and are only transferred off detector once the first level trigger acceptance has been confirmed (at a rate of maximum 100 kHz). The Large Hadron Collider (LHC) has envisaged a series of upgrades towards a High Luminosity LHC (HL-LHC) delivering five times the LHC nominal instantaneous luminosity. The ATLAS Phase II upgrade, in 2024, will accommodate the upgrade of the detector and data acquisition system for the HL-LHC. In particular, TileCal will undergo a major replacement of its on- and of...

  9. ATLAS LAr Calorimeter Trigger Electronics Phase-1 Upgrade

    CERN Document Server

    Aad, Georges; The ATLAS collaboration

    2017-01-01

    The upgrade of the Large Hadron Collider (LHC) scheduled for a shut-down period of 2019-2020, referred to as the Phase-I upgrade, will increase the instantaneous luminosity to about three times the design value. Since the current ATLAS trigger system does not allow sufficient increase of the trigger rate, an improvement of the trigger system is required. The Liquid Argon (LAr) Calorimeter read-out will therefore be modified to use digital trigger signals with a higher spatial granularity in order to improve the identification efficiencies of electrons, photons, tau, jets and missing energy, at high background rejection rates at the Level-1 trigger. The new trigger signals will be arranged in 34000 so-called Super Cells which achieves 5-10 times better granularity than the trigger towers currently used and allows an improved background rejection. The readout of the trigger signals will process the signal of the Super Cells at every LHC bunch-crossing at 12-bit precision and a frequency of 40 MHz. The data will...

  10. Upgrades to meet LANL SF, 121-2011, hazardous waste facility permit requirements

    International Nuclear Information System (INIS)

    French, Sean B.; Johns-Hughes, Kathryn W.

    2011-01-01

    Members of San IIdefonso have requested information from LANL regarding implementation of the revision to LANL's Hazardous Waste Facility Permit (the RCRA Permit). On January 26, 2011, LANL staff from the Waste Disposition Project and the Environmental Protection Division will provide a status update to Pueblo members at the offices of the San IIdefonso Department of Environmental and Cultural Preservation. The Waste Disposition Project presentation will focus on upgrades and improvements to LANL waste management facilities at TA-50 and TA-54. The New Mexico Environment Department issued LANL's revised Hazardous Waste Facility permit on November 30, 2010 with a 30-day implementation period. The Waste Disposition Project manages and operates four of LANL's permitted facilities; the Waste Characterization, Reduction and Repackaging Facility (WCRRF) at TA-SO, and Area G, Area L and the Radioassay and Nondestructive Testing facility (RANT) at TA-54. By implementing a combination of permanent corrective action activities and shorter-term compensatory measures, WDP was able to achieve functional compliance on December 30, 2010 with new Permit requirements at each of our facilities. One component of WOP's mission at LANL is centralized management and disposition of the Laboratory's hazardous and mixed waste. To support this mission objective, WOP has undertaken a project to upgrade our facilities and equipment to achieve fully compliant and efficient waste management operations. Upgrades to processes, equipment and facilities are being designed to provide defense-in-depth beyond the minimum, regulatory requirements where worker safety and protection of the public and the environment are concerned. Upgrades and improvements to enduring waste management facilities and operations are being designed so as not to conflict with future closure activities at Material Disposal Area G and Material Disposal Area L.

  11. Securing budget for and implementing your significant simulator upgrade: The Fermi experience

    International Nuclear Information System (INIS)

    Crone, B.D.

    2006-01-01

    Detroit Edison has selected CAE to perform a total simulator upgrade (with the exception of the panel hardware and I/O system) of the Fermi 2 station simulator. The upgrade is intended to improve the performance of the simulator (and thus training effectiveness) while reducing associated operating costs by utilizing an industry standard operating platform, software applications, and off the shelf PC based computer hardware. Additionally, the upgrade is intended to provide the ability to conduct classroom presentations through the use of desktop simulators. Because the cost of a total upgrade is considerable, substantial work is necessary to convince site management that such an undertaking is necessary, can be performed efficiently, and that a return on investment is even possible. This effort was compounded by the lingering history of a previous simulator upgrade, which was completed considerably over-budget and beyond the intended Ready for Training date. As of this writing, the Fermi 2 Simulator Upgrade using CAE products is approximately 60% complete. This paper will describe the methods used to procure funding, as well as steps taken following funding approval to keep the project on track for successful completion. (author)

  12. The Phase-2 ATLAS ITk Pixel Upgrade

    CERN Document Server

    Rossi, Leonardo Paolo; The ATLAS collaboration

    2018-01-01

    The upgrade of the ATLAS experiment for the operation at the High Luminosity Large Hadron Collider requires a new and more performant inner tracker, the ITk. The innermost part of this tracker will be built using silicon pixel detectors. This paper describes the ITk pixel project, which, after few years of design and test e ort, is now defined in detail.

  13. Bevalac injector final stage RF amplifier upgrades

    International Nuclear Information System (INIS)

    Howard, D.; Calvert, J.; Dwinell, R.; Lax, J.; Lindner, A.; Richter, R.; Ridgeway, W.

    1991-01-01

    With the assistance of the DOE In-house Energy Management Program, the Bevalac injector final stage RF amplifier systems have been successfully upgraded to reduce energy consumption and operating costs. This recently completed project removed the energy-inefficient plate voltage modulator circuits that were used in conjunction with the final stage RF amplifiers. Construction, design, and operating parameters are described in detail

  14. Using Social Media for Research Dissemination: The Digital Research Video Project

    Directory of Open Access Journals (Sweden)

    Suzanne Pilaar Birch

    2013-09-01

    Full Text Available This article discusses the outcomes of the Digital Research Video Project, which was part of the larger Social Media Knowledge Exchange program at the Centre for Research in the Arts, Social Sciences, and Humanities (CRASSH at the University of Cambridge and funded by the Arts & Humanities Research Council (UK. The project was founded on the premise that open access publication of research, while important, does not necessarily make research accessible. Often, PhD students and post-doctoral scholars lack the skills needed to communicate their research to a broader audience. The goal of the project was, first, to provide communication training to early career researchers (achieved through a workshop held in autumn 2012 and second, to create illustrated videos highlighting projects by early career researchers that would help them engage with their work using multimedia and share their results with a larger audience. This article considers the methods of dissemination and impact of the project.

  15. WE-AB-303-09: Rapid Projection Computations for On-Board Digital Tomosynthesis in Radiation Therapy

    Energy Technology Data Exchange (ETDEWEB)

    Iliopoulos, AS; Sun, X [Duke University, Durham, NC (United States); Pitsianis, N [Aristotle University of Thessaloniki (Greece); Duke University, Durham, NC (United States); Yin, FF; Ren, L [Duke University Medical Center, Durham, NC (United States)

    2015-06-15

    Purpose: To facilitate fast and accurate iterative volumetric image reconstruction from limited-angle on-board projections. Methods: Intrafraction motion hinders the clinical applicability of modern radiotherapy techniques, such as lung stereotactic body radiation therapy (SBRT). The LIVE system may impact clinical practice by recovering volumetric information via Digital Tomosynthesis (DTS), thus entailing low time and radiation dose for image acquisition during treatment. The DTS is estimated as a deformation of prior CT via iterative registration with on-board images; this shifts the challenge to the computational domain, owing largely to repeated projection computations across iterations. We address this issue by composing efficient digital projection operators from their constituent parts. This allows us to separate the static (projection geometry) and dynamic (volume/image data) parts of projection operations by means of pre-computations, enabling fast on-board processing, while also relaxing constraints on underlying numerical models (e.g. regridding interpolation kernels). Further decoupling the projectors into simpler ones ensures the incurred memory overhead remains low, within the capacity of a single GPU. These operators depend only on the treatment plan and may be reused across iterations and patients. The dynamic processing load is kept to a minimum and maps well to the GPU computational model. Results: We have integrated efficient, pre-computable modules for volumetric ray-casting and FDK-based back-projection with the LIVE processing pipeline. Our results show a 60x acceleration of the DTS computations, compared to the previous version, using a single GPU; presently, reconstruction is attained within a couple of minutes. The present implementation allows for significant flexibility in terms of the numerical and operational projection model; we are investigating the benefit of further optimizations and accurate digital projection sub

  16. WE-AB-303-09: Rapid Projection Computations for On-Board Digital Tomosynthesis in Radiation Therapy

    International Nuclear Information System (INIS)

    Iliopoulos, AS; Sun, X; Pitsianis, N; Yin, FF; Ren, L

    2015-01-01

    Purpose: To facilitate fast and accurate iterative volumetric image reconstruction from limited-angle on-board projections. Methods: Intrafraction motion hinders the clinical applicability of modern radiotherapy techniques, such as lung stereotactic body radiation therapy (SBRT). The LIVE system may impact clinical practice by recovering volumetric information via Digital Tomosynthesis (DTS), thus entailing low time and radiation dose for image acquisition during treatment. The DTS is estimated as a deformation of prior CT via iterative registration with on-board images; this shifts the challenge to the computational domain, owing largely to repeated projection computations across iterations. We address this issue by composing efficient digital projection operators from their constituent parts. This allows us to separate the static (projection geometry) and dynamic (volume/image data) parts of projection operations by means of pre-computations, enabling fast on-board processing, while also relaxing constraints on underlying numerical models (e.g. regridding interpolation kernels). Further decoupling the projectors into simpler ones ensures the incurred memory overhead remains low, within the capacity of a single GPU. These operators depend only on the treatment plan and may be reused across iterations and patients. The dynamic processing load is kept to a minimum and maps well to the GPU computational model. Results: We have integrated efficient, pre-computable modules for volumetric ray-casting and FDK-based back-projection with the LIVE processing pipeline. Our results show a 60x acceleration of the DTS computations, compared to the previous version, using a single GPU; presently, reconstruction is attained within a couple of minutes. The present implementation allows for significant flexibility in terms of the numerical and operational projection model; we are investigating the benefit of further optimizations and accurate digital projection sub

  17. Digital labour and development: impacts of global digital labour platforms and the gig economy on worker livelihoods.

    Science.gov (United States)

    Graham, Mark; Hjorth, Isis; Lehdonvirta, Vili

    2017-05-01

    As ever more policy-makers, governments and organisations turn to the gig economy and digital labour as an economic development strategy to bring jobs to places that need them, it becomes important to understand better how this might influence the livelihoods of workers. Drawing on a multi-year study with digital workers in Sub-Saharan Africa and South-east Asia, this article highlights four key concerns for workers: bargaining power, economic inclusion, intermediated value chains, and upgrading. The article shows that although there are important and tangible benefits for a range of workers, there are also a range of risks and costs that unduly affect the livelihoods of digital workers. Building on those concerns, it then concludes with a reflection on four broad strategies - certification schemes, organising digital workers, regulatory strategies and democratic control of online labour platforms - that could be employed to improve conditions and livelihoods for digital workers.

  18. Upgraded Readout Electronics for the ATLAS Liquid Argon Calorimeters at the High Luminosity LHC

    CERN Document Server

    Andeen, T; The ATLAS collaboration

    2012-01-01

    The ATLAS Liquid Argon (LAr) calorimeters produce a total of 182,486 signals which are digitized and processed by the front-end and back-end electronics at every triggered event. In addition, the front-end electronics is summing analog signals to provide coarsely grained energy sums, called trigger towers, to the first-level trigger system, which is optimized for nominal LHC luminosities. However, the pile-up noise expected during the High Luminosity phases of LHC will be increased by factors of 3 to 7. An improved spatial granularity of the trigger primitives is therefore proposed in order to improve the identification performance for trigger signatures, like electrons or photons, at high background ejection rates. For the first upgrade phase cite{pahse1loi} in 2018, new LAr Trigger Digitizer Boards (LTDB) are being designed to receive higher granularity signals, digitize them on detector and send them via fast optical links to a new digital processing system (DPS). The DPS applies a digital filtering and id...

  19. Secure digital communication using controlled projective synchronisation of chaos

    International Nuclear Information System (INIS)

    Chee, C.Y.; Xu Daolin

    2005-01-01

    A new approach to chaos communication is proposed to encrypt digital information using controlled projective synchronisation. The scheme encrypts a binary sequence by manipulating the scaling feature of synchronisation from the coupled system. The transmitted signal therefore embeds only a single set of statistical properties. This prevents cryptanalysts from breaking the chaotic encryption scheme by using characteristic cryptanalysis that aims to detect switching of statistical properties in the intercepted information carrier signal. Pseudo-random switching key is incorporated into the scheme to masked out the deterministic nature of the underlying coupled system

  20. Regulatory issues of digital instrumentation and control system in Lungmen project

    International Nuclear Information System (INIS)

    Chuang, C.F.; Chou, H.P.

    2004-01-01

    The Lungmen Nuclear Power Station (LNPS) is currently under construction in Taiwan, which consists of 2 advanced boiling water reactor (ABWR) units. The instrumentation and control (IC) systems of the LNPS are based on the state-of-the-art modernized fully integrated digital design. These IC systems possess many advantages and distinguished features comparing to traditional analog IC systems, they enjoy set-point stability, self-diagnostic and automatic testing ability, fault tolerance and avoidance, low power requirements, data handling and storage capability, as well as enhanced human-machine interfaces. This paper presents regulatory overviews, regulatory requirements, current major regulatory issues, as well as the areas of regulatory concerns and the lessons learned on the digital IC systems in the Lungmen Project

  1. Upgrading during difficult times

    International Nuclear Information System (INIS)

    Tiefenbach, K.

    1993-01-01

    The Co-op Upgrader is part of an integrated refinery and upgrader complex in Regina, Saskatchewan. The upgrader processes 50,000 bbl/d heavy sour crude oil, mostly Fosterton and dilute Lloydminster crude, via hydrogen addition and carbon rejection, desulfurization, demetallization, and denitrification to yield a synthetic crude blend. The synthetic crude is refined to produce gasoline and diesel fuel. Byproducts from the integrated operation include 100,000 tonnes/y of petroleum coke, 65,000 tonnes/y of sulfur, propane, butane, fuel oil, and metals (Ni and V) in the form of spent catalysts. Recent operational and economic challenges faced by the upgrader are reviewed. Technical challenges include operating the upgrader's high-temperature high-pressure heavy oil hydrotreating unit and distillate hydrogenation unit, removal and replacement of the desulfurization catalyst, waste management, and producing coke of sufficient quality. Economic challenges include the shrinking differential between light and heavy oil, higher prices for natural gas (the main raw material for hydrogen production for upgrading), seasonal changes in product specifications, and lower prices for sulfur and metal byproducts. The upgrader is also affected by interest rates since borrowing costs are the single largest expenditure after crude oil purchases. 4 figs

  2. Gas system Upgrade for the BaBar IFR Detector at SLAC

    International Nuclear Information System (INIS)

    Foulkes, S

    2004-01-01

    A new gas distribution and monitoring system was installed as part of an upgrade of the forward endcap muon detection system (IFR) of the BaBar detector at SLAC. Over 300 gas circuits are controlled and monitored. The return gas flow is monitored by digital bubblers which use photo-gate electronics to count the bubbling rate. The rates are monitored in real time and recorded in a history database allowing studies of flow rate versus chamber performance

  3. Technical Note: Insertion of digital lesions in the projection domain for dual-source, dual-energy CT.

    Science.gov (United States)

    Ferrero, Andrea; Chen, Baiyu; Li, Zhoubo; Yu, Lifeng; McCollough, Cynthia

    2017-05-01

    To compare algorithms performing material decomposition and classification in dual-energy CT, it is desirable to know the ground truth of the lesion to be analyzed in real patient data. In this work, we developed and validated a framework to insert digital lesions of arbitrary chemical composition into patient projection data acquired on a dual-source, dual-energy CT system. A model that takes into account beam-hardening effects was developed to predict the CT number of objects with known chemical composition. The model utilizes information about the x-ray energy spectra, the patient/phantom attenuation, and the x-ray detector energy response. The beam-hardening model was validated on samples of iodine (I) and calcium (Ca) for a second-generation dual-source, dual-energy CT scanner for all tube potentials available and a wide range of patient sizes. The seven most prevalent mineral components of renal stones were modeled and digital stones were created with CT numbers computed for each patient/phantom size and x-ray energy spectra using the developed beam-hardening model. Each digital stone was inserted in the dual-energy projection data of a water phantom scanned on a dual-source scanner and reconstructed with the routine algorithms in use in our practice. The geometry of the forward projection for dual-energy data was validated by comparing CT number accuracy and high-contrast resolution of simulated dual-energy CT data of the ACR phantom with experimentally acquired data. The beam-hardening model and forward projection method accurately predicted the CT number of I and Ca over a wide range of tube potentials and phantom sizes. The images reconstructed after the insertion of digital kidney stones were consistent with the images reconstructed from the scanner, and the CT number ratios for different kidney stone types were consistent with data in the literature. A sample application of the proposed tool was also demonstrated. A framework was developed and validated

  4. Plant process computer system upgrades at the KSG simulator centre

    International Nuclear Information System (INIS)

    2006-01-01

    The human-machine interface (HMI) of a modern plant process computer system (PPC) differs significantly from that of older systems. Along with HMI changes, there are often improvements to system functionality such as alarm display and printing functions and transient data analysis capabilities. Therefore, the upgrade or replacement of a PPC in the reference plant will typically require an upgrade of the simulator (see Section 6.5.1 for additional information). Several options are available for this type of project including stimulation of a replica system,or emulation, or simulation of PPC functionality within the simulation environment. To simulate or emulate a PCC, detailed knowledge of hardware and software functionality is required. This is typically vendor proprietary information, which leads to licensing and other complications. One of the added benefits of stimulating the PPC system is that the simulator can be used as a test bed for functional testing (i.e. verification and validation) of the system prior to installation in the reference plant. Some of this testing may include validation of the process curve and system diagram displays. Over the past few years several German NPPs decided to modernize their plant process computer (PPC) systems. After the NPPs had selected the desired system to meet their requirements the question arose how to modernize the PPC systems on the corresponding simulators. Six German NPPs selected the same PPC system from the same vendor and it was desired to perform integral tests of the HMI on the simulators. In this case the vendor offered a stimulated variant of their system and it therefore made sense to choose that implementation method for upgrade of the corresponding simulators. The first simulator PPC modernization project can be considered as a prototype project for the follow-on projects. In general, from the simulator project execution perspective the implementation of several stimulated PPC systems of the same type

  5. Energy upgrades as financial or strategic investment? Energy Star property owners and managers improving building energy performance

    International Nuclear Information System (INIS)

    Gliedt, Travis; Hoicka, Christina E.

    2015-01-01

    Highlights: • Energy Star property owners/managers view energy as strategic or financial investments. • Energy performance improvements and motivations differ by property type. • Energy projects are most often funded by internal cash reserves. • Motivations and funding sources differ by type of energy project. • Environmental sustainability is an important criterion in many energy projects. - Abstract: Due to its significant carbon footprint and cost-effectiveness for upgrades, the commercial property sector is important for climate change mitigation. Although barriers to energy system changes, such as funding, financing and information, are well recognized, Energy Star property owners and managers are successfully overcoming these barriers and instigating energy efficiency upgrades, renewable energy installations, and behavior and management programs. To examine the decision-making process that leads to energy performance improvements, a national survey of property owners and management organizations of buildings that earned an Energy Star score of 75 or higher was conducted. The extent to which energy upgrades were considered strategic investments motivated by environmental sustainability or corporate social responsibility, or financial investments motivated by payback period or return-on-investment criteria, was contingent upon the property type and type of energy project. Environmental sustainability was found to be an important motivation for energy projects in office spaces in general, but in the case of smaller office spaces was often combined with motivations for corporate social responsibility. Energy projects on education properties were motivated by financial investment. Building envelope and mechanical efficiency upgrades were considered financial investments, while renewable energy, green roofs, and water conservation technologies were considered environmental sustainability initiatives

  6. NSLS control system upgrade

    International Nuclear Information System (INIS)

    Smith, J.D.; Ramamoorthy, Susila; Tang, Y.N.

    1994-01-01

    The NSLS consists of two storage rings, a booster and a linac. A major upgrade of the control system (installed in 1978) was undertaken and has been completed. The computer architecture is being changed from a three level star-network to a two level distributed system. The microprocessor subsystem, host computer and workstations, communication link and the main software components are being upgraded or replaced. Since the NSLS rings operate twenty four hours a day a year with minimum maintenance time, the key requirement during the upgrade phase is a non-disruptive transition with minimum downtime. Concurrent with the upgrade, some immediate improvements were required. This paper describes the various components of the upgraded system and outlines the future plans. ((orig.))

  7. NSLS control system upgrade

    International Nuclear Information System (INIS)

    Smith, J.D.; Ramamoorthy, S.; Tang, Yong N.

    1995-01-01

    The NSLS consists of two storage rings, a booster and a linac. A major upgrade of the control system (installed in 1978) was undertaken and has been completed. The computer architecture is being changed from a three level star-network to a two level distributed system. The microprocessor subsystem, host computer and workstations, communication link and the main software components are being upgraded or replaced. Since the NSLS rings operate twenty four hours a day a year with minimum maintenance time, the key requirement during the upgrade phase is a non-disruptive transition with minimum downtime. Concurrent with the upgrade, some immediate improvements were required. This paper describes the various components of the upgraded system and outlines the future plans

  8. SU-G-IeP2-15: Virtual Insertion of Digital Kidney Stones Into Dual-Source, Dual- Energy CT Projection Data

    International Nuclear Information System (INIS)

    Ferrero, A; Chen, B; Huang, A; Montoya, J; Yu, L; McCollough, C

    2016-01-01

    Purpose: In order to investigate novel methods to more accurately estimate the mineral composition of kidney stones using dual energy CT, it is desirable to be able to combine digital stones of known composition with actual phantom and patient scan data. In this work, we developed and validated a method to insert digital kidney stones into projection data acquired on a dual-source, dual-energy CT system. Methods: Attenuation properties of stones of different mineral composition were computed using tabulated mass attenuation coefficients, the chemical formula for each stone type, and the effective beam energy at each evaluated tube potential. A previously developed method to insert lesions into x-ray CT projection data was extended to include simultaneous dual-energy CT projections acquired on a dual-source gantry (Siemens Somatom Flash). Digital stones were forward projected onto both detectors and the resulting projections added to the physically acquired sinogram data. To validate the accuracy of the technique, digital stones were inserted into different locations in the ACR CT accreditation phantom; low and high contrast resolution, CT number accuracy and noise properties were compared before and after stone insertion. The procedure was repeated for two dual-energy tube potential pairs in clinical use on the scanner, 80/Sn140 kV and 100/Sn140 kV, respectively. Results: The images reconstructed after the insertion of digital kidney stones were consistent with the images reconstructed from the scanner. The largest average CT number difference for the 4 insert in the CT number accuracy module of the phantom was 3 HU. Conclusion: A framework was developed and validated for the creation of digital kidney stones of known mineral composition, and their projection-domain insertion into commercial dual-source, dual-energy CT projection data. This will allow a systematic investigation of the impact of scan and reconstruction parameters on stone attenuation and dual

  9. Development of Digital MMIS for Research Reactors: Graded Approaches

    Energy Technology Data Exchange (ETDEWEB)

    Khalil ur, Rahman; Shin, Jin Soo; Heo, Gyun Young [Kyunghee University, Yongin (Korea, Republic of); Son, Han Seong [Joongbu University, Geumsan (Korea, Republic of); Kim, Young Ki; Park, Jae Kwan; Seo, Sang Mun; Kim, Yong Jun [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2012-05-15

    Though research reactors are small in size yet they are important in terms of industrial applications and R and D, educational purposes. Keeping the eye on its importance, Korean government has intention to upgrade and extend this industry. Presently, Korea is operating only HANARO at Korea Atomic Energy Research Institute (KAERI) and AGN-201K at Kyung Hee University (KHU), which are not sufficient to meet the current requirements of research and education. In addition, we need self-sufficiency in design and selfreliance in design and operation, as we are installing research reactors in domestic as well as foreign territories for instance Jordan. Based on these demands, KAERI and universities initiated a 5 year research project since December 2011 collaboratly, for the deep study of reactor core, thermal hydraulics, materials and instrumentation and control (I and C). This particular study is being carried out to develop highly reliable advanced digital I and C systems using a grading approach. It is worth mentioning that next generation research reactor should be equipped with advance state of the art digital I and C for safe and reliable operation and impermeable cyber security system that is needed to be devised. Moreover, human error is one of important area which should be linked with I and C in terms of Man Machine Interface System (MMIS) and development of I and C should cover human factor engineering. Presently, the digital I and C and MMIS are well developed for commercial power stations whereas such level of development does not exist for research reactors in Korea. Since the functional and safety requirements of research reactors are not so strict as commercial power plants, the design of digital I and C systems for research reactors seems to be graded based on the stringency of regulatory requirements. This paper was motivated for the introduction of those missions, so it is going to describe the general overview of digital I and C systems, the graded

  10. Development of Digital MMIS for Research Reactors: Graded Approaches

    International Nuclear Information System (INIS)

    Khalil ur, Rahman; Shin, Jin Soo; Heo, Gyun Young; Son, Han Seong; Kim, Young Ki; Park, Jae Kwan; Seo, Sang Mun; Kim, Yong Jun

    2012-01-01

    Though research reactors are small in size yet they are important in terms of industrial applications and R and D, educational purposes. Keeping the eye on its importance, Korean government has intention to upgrade and extend this industry. Presently, Korea is operating only HANARO at Korea Atomic Energy Research Institute (KAERI) and AGN-201K at Kyung Hee University (KHU), which are not sufficient to meet the current requirements of research and education. In addition, we need self-sufficiency in design and selfreliance in design and operation, as we are installing research reactors in domestic as well as foreign territories for instance Jordan. Based on these demands, KAERI and universities initiated a 5 year research project since December 2011 collaboratly, for the deep study of reactor core, thermal hydraulics, materials and instrumentation and control (I and C). This particular study is being carried out to develop highly reliable advanced digital I and C systems using a grading approach. It is worth mentioning that next generation research reactor should be equipped with advance state of the art digital I and C for safe and reliable operation and impermeable cyber security system that is needed to be devised. Moreover, human error is one of important area which should be linked with I and C in terms of Man Machine Interface System (MMIS) and development of I and C should cover human factor engineering. Presently, the digital I and C and MMIS are well developed for commercial power stations whereas such level of development does not exist for research reactors in Korea. Since the functional and safety requirements of research reactors are not so strict as commercial power plants, the design of digital I and C systems for research reactors seems to be graded based on the stringency of regulatory requirements. This paper was motivated for the introduction of those missions, so it is going to describe the general overview of digital I and C systems, the graded

  11. BNFL Magnox - Upgrades and enhancements

    International Nuclear Information System (INIS)

    Udbinac, M.J.

    2006-01-01

    In the past, generic models, restrictive budgets,and general shortages of resources have limited the scope of the UK's older Magnox simulators. Nevertheless, the simulators evolved slowly over time, becoming more like their reference plants, as resources became available. Three years ago, the Training and Development Branch of Magnox Electric plc took a giant leap, investing significant resources into the modernization of their training simulators. New hardware was built, including a new simulator room. The simulator software was ported from Unix running on outdated servers to new servers running Microsoft Windows NT. Perhaps most significantly, major model enhancements were made to key plant systems to significantly increase the likeness of each simulator to its reference plant. The upgrade to NT, the addition of state-of-the-art instructor stations, and some of the model enhancements were achieved with SimPort, an all-inclusive simulation package provided by DS and S. This paper will provide a more detailed view of the Magnox modular simulators, including how they are used and how they have benefited from the enhancements and upgrades implemented during the project. (author)

  12. A case study of intelligent compaction used in road upgrades

    CSIR Research Space (South Africa)

    Leyland, R

    2014-08-01

    Full Text Available to traditional testing methods. In a field study numerous different IC systems where used during construction of a number of experimental road sections in South Africa. These sections formed part of a road upgrade project typical of most road construction...

  13. Development of upgraded brown coal process

    Energy Technology Data Exchange (ETDEWEB)

    Komatsu, N.; Sugita, S.; Deguchi, T.; Shigehisa, T.; Makino, E. [Kobe Steel Ltd., Hyogo (Japan). Coal and Energy Project Department

    2004-07-01

    Half of the world's coal resources are so-called low rank coal (LRC) such as lignite, subbituminous coal. Utilization of such coal is limited due to low heat value and high propensity of spontaneous combustion. Since some of LRCs have advantages as clean coal, i.e. low ash and low sulfur content, LRC can be the excellent feedstock for power generation and metallurgy depending on the upgrading technology. The UBC (upgraded brown coal) process introduced here converts LRC to solid fuel with high heat value and less propensity of self-heating. Various world coals, such as Australian, Indonesian and USA LRC, were tested using the Autoclave and Bench Scale Unit, and the process application to LRC of wide range is proven. The R & D activities of the UBC process are introduced including a demonstration project with a 5 ton/day test plant in progress in Indonesia, expecting near future commercialisation in order to utilize abundant LRC of clean properties. 8 refs., 12 figs., 3 tabs.

  14. Safety evaluation for instrumentation and control system upgrading project of Malaysian TRIGA MARK II PUSPATI Research reactor

    International Nuclear Information System (INIS)

    Ridha Roslan; Nik Mohd Faiz Khairuddin

    2013-01-01

    Full-text: Malaysian TRIGA MARK II research reactor has been in safe operation since its first criticality in 1982. The reactor is licensed to be operated by Malaysian Nuclear Agency to perform training and research development related activities. Due to its extensive operation since last three decades, the option of modifications for safety and safety-related item and component become a necessary to replace the outdated equipment to a stat-of-art, reliable technologies. This paper will present the current regulatory activities performed by Atomic Energy Licensing Board (AELB) to ensure the upgrading of analogue to digital instrumentation and control system is implemented in safe manner. The review activity includes documentation review, manufacturer quality audit and on-site inspection for commissioning. The review performed by AELB is based on The International Atomic Energy Agency (IAEA) Safety Requirements NS-R-4, entitled Safety of Research Reactors. During this endeavour, AELB seeks technical cooperation from Korea Institute of Nuclear Safety (KINS), the nuclear experts organization of the country of origin of the instrumentation and control technology. The regulatory activity is still on-going and is expected to be completed by issuance of Authorization for Restart on December 2013. (author)

  15. Digital labour and development: impacts of global digital labour platforms and the gig economy on worker livelihoods

    Science.gov (United States)

    Hjorth, Isis; Lehdonvirta, Vili

    2017-01-01

    As ever more policy-makers, governments and organisations turn to the gig economy and digital labour as an economic development strategy to bring jobs to places that need them, it becomes important to understand better how this might influence the livelihoods of workers. Drawing on a multi-year study with digital workers in Sub-Saharan Africa and South-east Asia, this article highlights four key concerns for workers: bargaining power, economic inclusion, intermediated value chains, and upgrading. The article shows that although there are important and tangible benefits for a range of workers, there are also a range of risks and costs that unduly affect the livelihoods of digital workers. Building on those concerns, it then concludes with a reflection on four broad strategies – certification schemes, organising digital workers, regulatory strategies and democratic control of online labour platforms – that could be employed to improve conditions and livelihoods for digital workers. PMID:28781494

  16. Digital multilayer tomography

    International Nuclear Information System (INIS)

    Dueber, C.; Klose, K.J.; Thelen, M.

    1991-01-01

    With digital multilayer tomography a sequence of projection images is recorded by an image intensifier television system and stored as digital data during a linear run of a layer sequence. Using this data record, tomograms of the examined body region can be computed for any layer thickness by shifts and superimposition of the single projections later at a digital workstation. The qualities of digital and conventional tomograms are basically comparable. A drawback of digital tomography is its lower local resolution (512 x 512 image matrix), advantages are a lower radiation exposure, a shorter patient examination time, and the facilities of digital image processing (later processing, archive setup, transmission). (orig.) [de

  17. Expanding a digital content management system for the growing digital media enterprise

    CERN Document Server

    Arthur, Magan H

    2013-01-01

    Building large integrated content management systems is a daunting task and there is little guidance for the implementation process for the mid-level manager. There are thousands of home grown or old standalone systems in need of upgrading and expanding to keep up with the growing challenge of digital media. This book allows the non-technical executive to understand the key concepts and issues. It covers the technical process and business aspects of expanding a system.

  18. Incidence, predictors, and procedural results of upgrade to resynchronization therapy: the RAFT upgrade substudy.

    Science.gov (United States)

    Essebag, Vidal; Joza, Jacqueline; Birnie, David H; Sapp, John L; Sterns, Laurence D; Philippon, Francois; Yee, Raymond; Crystal, Eugene; Kus, Teresa; Rinne, Claus; Healey, Jeffrey S; Sami, Magdi; Thibault, Bernard; Exner, Derek V; Coutu, Benoit; Simpson, Chris S; Wulffhart, Zaev; Yetisir, Elizabeth; Wells, George; Tang, Anthony S L

    2015-02-01

    The resynchronization-defibrillation for ambulatory heart failure trial (RAFT) study demonstrated that adding cardiac resynchronization therapy (CRT) in selected patients requiring de novo implantable cardiac defibrillators (ICD) reduced mortality as compared with ICD therapy alone, despite an increase in procedure-related adverse events. Data are lacking regarding the management of patients with ICD therapy who develop an indication for CRT upgrade. Participating RAFT centers provided data regarding de novo CRT-D (CRT with ICD) implant, upgrade to CRT-D during RAFT (study upgrade), and upgrade within 6 months after presentation of study results (substudy). Substudy centers enrolled 1346 (74.9%) patients in RAFT, including 644 de novo, 80 study upgrade, and 60 substudy CRT attempts. The success rate (initial plus repeat attempts) was 95.2% for de novo versus 96.3% for study upgrade and 90.0% for substudy CRT attempts (P=0.402). Acute complications occurred among 26.2% of de novo versus 18.8% of study upgrade and 3.4% of substudy CRT implantation attempts (PRAFT study and other trials. © 2014 American Heart Association, Inc.

  19. Human factors issues in digital system design and implementation

    International Nuclear Information System (INIS)

    Galletti, Greg S.

    1998-01-01

    A goal of the U.S. Nuclear Regulatory Commission (NRC) is to ensure safety in the application of digital equipment upgrades to nuclear power plant control rooms and local control stations. One of the areas of specific interest is the integration of digital technology into existing analog control, display, and information systems and the implications of such integration for operators in regard to their use of this new equipment to safely operate the plant. This paper is a discussion of human performance issues related to the introduction of such digital equipment into operating nuclear power plants. (author)

  20. Laser performance upgrade for precise ICF experiment in SG-Ⅲ laser facility

    Directory of Open Access Journals (Sweden)

    Wanguo Zheng

    2017-09-01

    Full Text Available The SG-Ⅲ laser facility (SG-Ⅲ is the largest laser driver for inertial confinement fusion (ICF researches in China, which has 48 beamlines and can deliver 180 kJ ultraviolet laser energy in 3 ns. In order to meet the requirements of precise physics experiments, some new functionalities need to be added to SG-Ⅲ and some intrinsic laser performances need upgrade. So at the end of SG-Ⅲ's engineering construction, the 2-year laser performance upgrade project started. This paper will introduce the newly added functionalities and the latest laser performance of SG-Ⅲ. With these function extensions and performance upgrade, SG-Ⅲ is now fully prepared for precise ICF experiments and solidly paves the way towards fusion ignition.

  1. ATLAS Tile Calorimeter Readout Electronics Upgrade Program for the High Luminosity LHC

    CERN Document Server

    Cerqueira, A S; The ATLAS collaboration

    2013-01-01

    The Tile Calorimeter (TileCal) is the hadronic calorimeter covering the most central region of the ATLAS experiment at LHC. The TileCal readout consists of about 10000 channels. The ATLAS upgrade program is divided in three phases: The Phase 0 occurs during 2013-2014 and prepares the LHC to reach peak luminosities of 1034 cm2s-1; Phase 1, foreseen for 2018-1019, prepares the LHC for peak luminosity up to 2-3 x 1034 cm2s-1, corresponding to 55 to 80 interactions per bunch-crossing with 25 ns bunch interval; and Phase 2 is foreseen for 2022-2023, whereafter the peak luminosity will reach 5-7 x 1034 cm2s-1 (HL-LHC). With luminosity leveling, the average luminosity will increase with a factor 10. The main TileCal upgrade is focused on the HL-LHC period. The upgrade aims at replacing the majority of the on- and off-detector electronics so that all calorimeter signals are directly digitized and sent to the off-detector electronics in the counting room. All new electronics must be able to cope with the increased rad...

  2. Proposal to upgrade the MIPP experiment

    Energy Technology Data Exchange (ETDEWEB)

    Isenhower, D.; Sadler, M.; Towell, R.; Watson, S. [Abilene Christian Univ., TX (United States); Peterson, R. J. [Univ. of Colorado, Boulder, CO (United States); Baker, W.; Carey, D.; Christian, D.; Demarteau, M.; Jensen, D.; Johnstone, C.; Meyer, H.; Raja, R.; Ronzhin, A.; Solomey, N.; Wester, W. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Gutbrod, H.; Peters, K. [GSI-Darmstadt (Germany); Feldman, G. [Harvard Univ., Cambridge, MA (United States); Torun, Y. [Illinois Inst. of Technology, Chicago, IL (United States); Messier, M. D.; Paley, J. [Indiana Univ., Bloomington, IN (United States)

    2006-09-01

    The upgraded MIPP physics results are needed for the support of NuMI projects, atmospheric cosmic ray and neutrino programs worldwide and will permit a systematic study of non-perturbative QCD interactions. The MIPP TPC is the largest contributor to the MIPP event size by far. Its readout system and electronics were designed in the 1990's and limit it to a readout rate of 60 Hz in simple events and {approx} 20 Hz in complicated events. With the readout chips designed for the ALICE collaboration at the LHC, we propose a low cost scheme of upgrading the MIPP data acquisition speed to 3000 Hz. This will also enable us to measure the medium energy numi target to be used for the NOvA/MINERvA experiments. We outline the capabilities of the upgraded MIPP detector to obtain high statistics particle production data on a number of nuclei that will help towards the understanding and simulation of hadronic showers in matter. Measurements of nitrogen cross sections will permit a better understanding of cosmic ray shower systematics in the atmosphere. In addition, we explore the possibilities of providing tagged neutral beams using the MIPP spectrometer that may be crucial for validating the Particle Flow Algorithm proposed for calorimeters for the International Linear Collider detectors. Lastly, we outline the physics potential of such a detector in understanding non-perturbative QCD processes.

  3. Modernization of control system using the digital control system; Modernizacion de sistemas de control usando la simulacion como herramiento de ingenieria

    Energy Technology Data Exchange (ETDEWEB)

    Carrasco, J. A.; Fernandez, L.; Jimenez, A.

    2002-07-01

    Nowadays, all plant automation tendencies are based on the use of Digital Control System. In big industrial plants the control systems employed are Distributed Control Systems (DCS). The addition of these systems in nuclear power plants,implies an important adaptation process, because most of them were installed using analog control systems. This paper presents the objectives and the first results obtained, in a modernization project, focused in obtaining an engineering platform for making test and analysis of changes prior to their implementation in a nuclear plant. Modernization, Upgrade, DCS, Automation, Simulation, Training. (Author)

  4. Upgrade readout and trigger electronics for the ATLAS liquid argon calorimeters for future LHC running

    CERN Document Server

    Yamanaka, T; The ATLAS collaboration

    2014-01-01

    The ATLAS Liquid Argon (LAr) calorimeters produce almost 200K signals that must be digitized and processed by the front-end and back-end electronics at every triggered event. Additionally, the front-end electronics sums analog signals to provide coarse-grained energy sums to the first-level (L1) trigger system. The current design was optimized for the nominal LHC luminosity of 10^34 cm^-2s^-1. However, in future higher-luminosity phases of LHC operation, the luminosity (and associated pile-up noise) will be 3-7 times higher. An improved spatial granularity of the trigger primitives is therefore proposed, in order to improve the trigger performance at high background rejection rates. For the first upgrade phase in 2018, new LAr Trigger Digitizer Boards are being designed to receive the higher granularity signals, digitize them on-detector and send them via fast optical links to a new digital processing system (DPS). This applies digital filtering and identifies significant energy depositions in each trigger ch...

  5. Upgraded readout and trigger electronics for the ATLAS liquid argon calorimeters for future LHC running

    CERN Document Server

    Yamanaka, T; The ATLAS collaboration

    2014-01-01

    The ATLAS Liquid Argon (LAr) calorimeters produce almost 200K signals that must be digitized and processed by the front-end and back-end electronics at every triggered event. Additionally, the front-end electronics sums analog signals to provide coarse-grained energy sums to the first-level (L1) trigger system. The current design was optimized for the nominal LHC luminosity of 10^34 cm^-2s^-1. However, in future higher-luminosity phases of LHC operation, the luminosity (and associated pile-up noise) will be 3-7 times higher. An improved spatial granularity of the trigger primitives is therefore proposed, in order to improve the trigger performance at high background rejection rates. For the first upgrade phase in 2018, new LAr Trigger Digitizer Boards are being designed to receive the higher granularity signals, digitize them on-detector and send them via fast optical links to a new digital processing system (DPS). This applies digital filtering and identifies significant energy depositions in each trigger ch...

  6. Upgrade of the CERN SPS Extraction Protection Elements TPS

    CERN Document Server

    Borburgh, Jan; Barnes, Michael; Baud, Cedric; Fraser, Matthew; Kain, Verena; Maciariello, Fausto; Steele, Genevieve; Velotti, Francesco

    2017-01-01

    In 2006 the protection devices upstream of the septa in both extraction channels of the CERN SPS to the LHC were installed. Since then, new beam parameters have been proposed for the SPS beam towards the LHC in the framework of the LIU project. The mechanical parameters and assumptions on which these protection devices presently have been based, need validation before the new upgraded versions can be designed and constructed. The paper describes the design assumptions for the present protection device and the testing program for the TPSG4 at HiRadMat to validate them. Finally the requirements and the options to upgrade both extraction protection elements in the SPS are described.

  7. Upgrade of the computer-based information systems on USNRC simulators

    International Nuclear Information System (INIS)

    Griffin, J.I.

    1998-01-01

    In late 1995, the U.S. Nuclear Regulatory Commission (USNRC) began a project to upgrade the computer-based information systems on its BWR/6 and BandW Simulators. The existing display generation hardware was very old and in need of replacement due to difficulty in obtaining spare parts and technical support. In addition, the display systems used currently each require a SEL 32/55 computer system, which is also obsolete, running the Real Time Monitor (RTM) operating system. An upgrade of the display hardware and display generation systems not only solves the problem of obsolescence of that equipment but also allows removal of the 32/55 systems. These computers are used only to support the existing display generation systems. Shortly after purchase of the replacement equipment, it was learned that the vendor was no longer going to support the methodology. Instead of implementing an unsupported concept, it was decided to implement the display systems upgrades using the Picasso-3 UIMS (User Interface Management System) and the purchased hardware. This paper describes the upgraded display systems for the BWR/6 and BandW Simulators, including the design concept, display development, hardware requirements, the simulator interface software, and problems encountered. (author)

  8. Digital Humanities and networked digital media

    DEFF Research Database (Denmark)

    Finnemann, Niels Ole

    2014-01-01

    This article discusses digital humanities and the growing diversity of digital media, digital materials and digital methods. The first section describes the humanities computing tradition formed around the interpretation of computation as a rule-based process connected to a concept of digital...... materials centred on the digitisation of non-digital, finite works, corpora and oeuvres. The second section discusses “the big tent” of contemporary digital humanities. It is argued that there can be no unifying interpretation of digital humanities above the level of studying digital materials with the help...... of software-supported methods. This is so, in part, because of the complexity of the world and, in part, because digital media remain open to the projection of new epistemologies onto the functional architecture of these media. The third section discusses the heterogeneous character of digital materials...

  9. Project Design Concept - Primary Ventilation System

    International Nuclear Information System (INIS)

    MCGREW, D.L.

    2000-01-01

    Tank Farm Restoration and Safe Operation (TFRSO), Project W-3 14 was established to provide upgrades that would improve the reliability and extend the system life of portions of the waste transfer, electrical, ventilation, instrumentation and control systems for the Hanford Site Tank Farms. An assessment of the tank farm system was conducted and the results are documented in system assessment reports. Based on the deficiencies identified in the tank farm system assessment reports, and additional requirements analysis performed in support of the River Protection Project (RPP), an approved scope for the TFRSO effort was developed and documented in the Upgrade Scope Summary Report (USSR), WHC-SD-W314-RPT-003, Rev. 4. The USSR establishes the need for the upgrades and identifies the specific equipment to be addressed by this project. This Project Design Concept (PDC) is in support of the Phase 2 upgrades and provides an overall description of the operations concept for the W-314 Primary Ventilation Systems. Actual specifications, test requirements, and procedures are not included in this PDC. The PDC is a ''living'' document, which will be updated throughout the design development process to provide a progressively more detailed description of the W-314 Primary Ventilation Systems design. The Phase 2 upgrades to the Primary Ventilation Systems shall ensure that the applicable current requirements are met for: Regulatory Compliance; Safety; Mission Requirements; Reliability; and Operational Requirements

  10. submitter Development of the readout for the IBL upgrade project of the ATLAS Pixel Detector

    CERN Document Server

    Krieger, Nina

    The LHC luminosity is upgraded in several phases until 2022. The resulting higher occupancy degrades the detector performance of the current Pixel Detector. To provide a good performance during the LHC luminosity upgrade, a fourth pixel layer is inserted into the existing ATLAS Pixel Detector. A new FE-I4 readout chip and a new data acquisition chain are required to cope with the higher track rate and the resulting increased bandwidth. Among others, this includes a new readout board: the IBL ROD. One component of this board is the DSP which creates commands for the FE-I4 chip and has to be upgraded as well. In this thesis, the first tests of the IBL ROD prototype are presented. A correct communication of the DSP to its external memory is verified. Moreover, the implementations for an IBL DSP code are described and tested. This includes the first configuration of the FE-I4 with an IBL ROD. In addition, a working communication with the Histogrammer SDRAM and the Input FIFO on the IBL ROD are demonstrated.

  11. Plant control system upgrades in the context of industry trends towards plant life-extension

    International Nuclear Information System (INIS)

    De Grosbois, J.; Basso, R.; Hepburn, A.; Kumar, V.

    2002-01-01

    Domestic CANDU nuclear plants were brought online between 1972 and 1986. Over the next decade, most of these stations will be nearing the end of their designed operating life. Effort has traditionally been placed on ensuring that the existing installed plant control system equipment could operate reliably until the end of this design life. Until recently, little attention has been given to plant control system upgrades or replacements to meet the expected requirement for 30+ years of additional plant operation following potential plant refurbishments. Industry developments are changing this thinking. The combination of expected increases in electricity demand (and prices), and the many recent successful turnaround stories of U.S. nuclear power plants has resulted in new interest in plant life improvement and plant life extension programs. Plant control system upgrade decisions are now being driven by the need to replace or upgrade these systems to support plant life extension. This article is the first of several that investigate aspects of plant control system upgrades or replacement, specifically in the context of the CANDU station digital control computers (DCCs). It sets the context for the discussion in the subsequent articles by providing a brief review of industry trends favouring plant refurbishment, by outlining the basic issues of aging and obsolescence of control system equipment, by establishing the need for upgrades and replacements, and by introducing some of the basic challenges to be addressed by the industry as it moves forward. (author)

  12. User-Centered Digital Library Project Phase 2: User Testing with Teachers and Students with Disabilities. Evaluation Report

    Science.gov (United States)

    Moeller, Babette

    2010-01-01

    The goal of the User-Centered Digital Library Project, conducted by the National Center for Accessible Media (NCAM) at WGBH, was to adapt the Teachers' Domain online digital library to enable teachers and students with disabilities to more readily use the resources in science classrooms. NCAM added accessibility features such as captions and audio…

  13. Upgrade of VR-1 training reactor I and C

    International Nuclear Information System (INIS)

    Kropik, M.; Matejka, K.; Chab, V.

    2003-01-01

    The contribution describes the upgrade of the VR-1 training reactor I and C (Instrumentation and Control). The reactor was put into operation in the 1990, and its I and C seems to be obsolete now. The new I and C utilises the same digital technology as the old one. The upgrade has been done gradually during holidays in order not to disturb the reactor utilisation during teaching and training. The first stage consisted in the human-machine interface and the control room upgrade in 2001. A new operator's desk, displays, indicators and buttons were installed. Completely new software and communication interface to the present I and C were developed. During the second stage in 2002, new control rod drivers and safety circuits were installed. The rod motors were replaced and necessary mechanical changes on the control rod mechanism, induced by the utilisation of the new motor, were done. The new safety circuits utilise high quality relays with forced contacts to guarantee high reliability of their operation. The third stage, the control system upgrade is being carried out now. The new control system is based on an industrial PC mounted in a 19 inch crate. The operating system of the PC is the Microsoft Windows XP with the real time support RTX of the VentureCom Company. A large amount of work has been devoted to the software requirements to specify all dependencies, modes and permitted actions, safety measures, etc. The Department took an active part in the setting of software requirements and later in verification and validation of the software and the whole control system. Finally, a new protection system consisting of power measuring and power protection channels will be installed in 2004 or 2005. (author)

  14. Recent achievements of the ATLAS upgrade Planar Pixel Sensors R and D Project

    International Nuclear Information System (INIS)

    George, M

    2014-01-01

    After the foreseen upgrade of the LHC towards the HL-LHC, coming along with higher beam energies and increased peak luminosities, the experiments have to upgrade their detector systems to cope with the expected higher occupancies and radiation damages. In case of the ATLAS experiment a new Inner Tracker will be installed in this context. The ATLAS Planar Pixel Sensor R and D Project (PPS) is investigating the possibilities to cope with these new requirements, using planar pixel silicon sensors, working in a collaboration of 17 institutions and more than 80 scientists. Since the new Inner Tracker is supposed to have an active area on the order of 8 m 2 on the one side and has to withstand extreme irradiation on the other side, the PPS community is working on several approaches to reduce production costs, while increasing the radiation tolerance of the sensors. Another challenge is to produce sensors in such large quantities. During the production of the Insertable b-Layer (IBL) modules, the PPS community has proven to be able to produce a large scale production of planar silicon sensors with a high yield. For cost reduction reasons, it is desirable to produce larger sensors. There the PPS community is working on so called quad- and hex-modules, which have a size of four, respectively six FE-I4 readout chips. To cope with smaller radii and strict material budget requirements for the new pixel layers, developments towards sensors with small inactive areas are in the focus of research. Different production techniques, which even allow the production of sensors with active edges, have been investigated and the designs were qualified using lab and testbeam measurements. The short distance between the new innermost pixel layers and the interaction point, combined with the increase in luminosity, requires designs which are more radiation tolerant. Since charge collection on the one hand decreases with irradiation and on the other hand is not uniform within the pixel cells

  15. Development and evaluation of a digital dental modeling method based on grating projection and reverse engineering software.

    Science.gov (United States)

    Zhou, Qin; Wang, Zhenzhen; Chen, Jun; Song, Jun; Chen, Lu; Lu, Yi

    2016-01-01

    For reasons of convenience and economy, attempts have been made to transform traditional dental gypsum casts into 3-dimensional (3D) digital casts. Different scanning devices have been developed to generate digital casts; however, each has its own limitations and disadvantages. The purpose of this study was to develop an advanced method for the 3D reproduction of dental casts by using a high-speed grating projection system and noncontact reverse engineering (RE) software and to evaluate the accuracy of the method. The methods consisted of 3 main steps: the scanning and acquisition of 3D dental cast data with a high-resolution grating projection system, the reconstruction and measurement of digital casts with RE software, and the evaluation of the accuracy of this method using 20 dental gypsum casts. The common anatomic landmarks were measured directly on the gypsum casts with a Vernier caliper and on the 3D digital casts with the Geomagic software measurement tool. Data were statistically assessed with the t test. The grating projection system had a rapid scanning speed, and smooth 3D dental casts were obtained. The mean differences between the gypsum and 3D measurements were approximately 0.05 mm, and no statistically significant differences were found between the 2 methods (P>.05), except for the measurements of the incisor tooth width and maxillary arch length. A method for the 3D reconstruction of dental casts was developed by using a grating projection system and RE software. The accuracy of the casts generated using the grating projection system was comparable with that of the gypsum casts. Copyright © 2016 Editorial Council for the Journal of Prosthetic Dentistry. Published by Elsevier Inc. All rights reserved.

  16. Preliminary safety analysis report for project 89-GEB-610 Plutonium Finishing Plant instrumentation upgrade. Revision 1

    International Nuclear Information System (INIS)

    Huber, T.E.

    1995-01-01

    This document consists of an analysis of the MICON system upgrade. This project shall install a Micon Co. distributed process monitor and control system with Sparc Sun workstation operator interfaces. The Sparc workstations are housed in consoles custom designed to human factors specifications. The distributed control system (DCS) shall have the installed capacity to monitor and control all related instruments and equipment presently connected to the panels in the PFP Power Control Room 321A as listed in the input/output list. This also includes all devices monitored and controlled by the 2736-ZB Allen Bradley programmable logic controller. The system has since assumed the control and monitoring responsibilities for Projects B- 680H ''Low Level Waste Treatment Facility'' and C-031H ''PFP Liquid Effluent Facilities''. Part of the new en's change area in Building 234-5ZA, Room 712, has been remodeled to house two consoles and one supervisor console. Local control units containing the microprocontrollers and the input/output interface circuit boards shall be wired to the instrumentation and controlled equipment. These units communicate with the Sparc workstations via a redundant data communications highway and shall be strategic, throughout the PFP facility. The DCS has already been purchased from Micon Co., located in Houston Texas, presently on site

  17. Upgrade of the Proton West secondary beamline

    International Nuclear Information System (INIS)

    Spiegel, L.

    1989-01-01

    As originally designed and operated, protons entering PW6 were steered by a series of EPB dipoles into a single interaction length beryllium target, some 43 feet from the enclosure wall. Ensuing secondary beams, either p + /π + or p - /π - , were collected by a string of quadrupoles following the target, steered westward, away from the Proton Center line, through PW6 and PW7, and ultimately focussed on experiment production targets located within the large PW8 hall. Around the Spring of 1988 it was decided to upgrade the existing Proton West secondary beamline to allow for transport of a primary proton beam, anticipated to be either 800 or 900 GeV/c, through PW8. This upgrade project, which is now nearing completion, was largely motivated by the then recent approval of E-771, a hadronic beauty production experiment located in PW8. E-771 represents the third in a series of experiments for the large-acceptance dimuon spectrometer presently located at the end of the Proton West beamline. This Technical Memo is a summary of the upgrade --- an explanation of the underlying strategy and a documentation of the final locations of the secondary beamline elements. 6 refs., 2 figs., 2 tabs

  18. All Digital IQ Servo-System for CERN Linacs

    CERN Document Server

    Rohlev, A; Garoby, R

    2003-01-01

    A new VME based system has been developed and built at CERN for the servo loops regulating the field in the linac accelerating structure. It makes use of high speed digital In-phase/Quadrature (IQ) detection, digital processing, and digital IQ modulation. The digital processing and IQ modulation is done in a single PLD. The system incorporates continually variable set points, iterative learning, feed forward as well as extensive diagnostics and other features well suited for digital implementations. Built on a single VME card, it will be first used in the energy ramping RF chain of the CERN Heavy Ion Linac (linac 3) and later for upgrading the present proton linac (linac 2). This system serves also as a prototype for the future Superconducting Proton Linac (SPL). The design principle and the experimental results are described.

  19. Upgrading the ATLAS Tile Calorimeter Electronics

    CERN Document Server

    Carrio, F

    2013-01-01

    This work summarizes the status of the on-detector and off-detector electronics developments for the Phase II Upgrade of the ATLAS Tile Calorimeter at the LHC scheduled around 2022. A demonstrator prototype for a slice of the calorimeter including most of the new electronics is planned to be installed in ATLAS in middle 2014 during the Long Shutdown. For the on-detector readout, three different front-end boards (FEB) alternatives are being studied: a new version of the 3-in-1 card, the QIE chip and a dedicated ASIC called FATALIC. The MainBoard will provide communication and control to the FEBs and the DaughterBoard will transmit the digitized data to the off-detector electronics in the counting room, where the sROD will perform processing tasks on them.

  20. Using Retrofit Nail Base Panels to Expand the Market for Wall Upgrades

    Energy Technology Data Exchange (ETDEWEB)

    Del Bianco, M. [Home Innovation Research Lab., Upper Marlboro, MD (United States); Wiehagen, J. [Home Innovation Research Lab., Upper Marlboro, MD (United States)

    2016-02-01

    This project evaluated the effectiveness and affordability of integrating retrofit insulated panels into a re-siding project. The Partnership for Home Innovation (PHI) teamed with New York State Energy Research and Development Authority (NYSERDA), the Albany Housing Authority (AHA), and the New York State Weatherization Assistance Program (WAP) administered by Albany Community Action Partnership to demonstrate an energy retrofit and siding upgrade on a two-story, seven unit, multifamily building in Albany New York (CZ 5). The project focused on accomplishing three goals - doubling the existing wall thermal resistance (from approximately R-13 to a weighted average of R-27), reduction of building air leakage, and completion of the retrofit within a budget where the additional cost for upgrading wall's thermal resistance is equal to the cost of the standard re-siding effort (i.e., the total cost of the energy efficient re-siding scope of work is not more than double the cost of the standard re-siding effort). Lessons learned from the project strongly indicate that the retrofit panel technology can be installed using common installation practices and with minimal training. Other lessons learned include limitation on the use of standard air sealing materials during cold weather installations and the need to develop better installation guidance for trades working with the level of tolerances that may be present in the existing structure. This technology demonstration showed that exterior retrofit panels provide a viable and reasonable option for the siding trades to increase market opportunities and achieve synergistic benefits for aesthetic upgrades to a building's exterior.

  1. Main Control Room Upgrade for Kori Unit 1 in Korea

    International Nuclear Information System (INIS)

    Ha, Jae Taeg; Choi, Moon Jae

    2014-01-01

    Kori Unit 1 is a 30 years old nuclear power plant and its MCR and MCB was upgraded based on the latest Human Factors Engineering (HFE) principles. The objectives of applying the Human Factors Engineering (HFE) principles are to minimize the human errors and to enhance the safe operation of the plant. In order to systematically incorporate the HFE design principles into the Human System Interface (HSI) design, HFE Program Plan (HFEPP) for Kori Unit 1 was developed and the plan provided an overview of the HSI design process along with detailed methods and results. The upgrade includes addition of Bypassed and Inoperable Status Indication System (BISI) and the replacement of the conventional MMI devices such as hardwired hand switches, recorders and indicators with new advanced control and display devices using VDUs (Video Display Units). The VDUs significantly improve the effectiveness and efficiency of the monitoring function. Plant Monitoring System (PMS) and Plant Annunciator System (PAS) were upgraded also by replacing the outdated systems with advanced digital systems with future expansion capability. In addition, the MCR related equipment and/or facilities were replaced or improved. Some of these include the enhancement of MCR interior designs for better working environment, dimmable ceiling lighting, aesthetically pleasing decor of ceiling, wall and floor as well as ergonomically improved operator consoles

  2. Main Control Room Upgrade for Kori Unit 1 in Korea

    Energy Technology Data Exchange (ETDEWEB)

    Ha, Jae Taeg; Choi, Moon Jae [KEPCO, Daejeon (Korea, Republic of)

    2014-08-15

    Kori Unit 1 is a 30 years old nuclear power plant and its MCR and MCB was upgraded based on the latest Human Factors Engineering (HFE) principles. The objectives of applying the Human Factors Engineering (HFE) principles are to minimize the human errors and to enhance the safe operation of the plant. In order to systematically incorporate the HFE design principles into the Human System Interface (HSI) design, HFE Program Plan (HFEPP) for Kori Unit 1 was developed and the plan provided an overview of the HSI design process along with detailed methods and results. The upgrade includes addition of Bypassed and Inoperable Status Indication System (BISI) and the replacement of the conventional MMI devices such as hardwired hand switches, recorders and indicators with new advanced control and display devices using VDUs (Video Display Units). The VDUs significantly improve the effectiveness and efficiency of the monitoring function. Plant Monitoring System (PMS) and Plant Annunciator System (PAS) were upgraded also by replacing the outdated systems with advanced digital systems with future expansion capability. In addition, the MCR related equipment and/or facilities were replaced or improved. Some of these include the enhancement of MCR interior designs for better working environment, dimmable ceiling lighting, aesthetically pleasing decor of ceiling, wall and floor as well as ergonomically improved operator consoles.

  3. Cost Model for Digital Preservation: Cost of Digital Migration

    DEFF Research Database (Denmark)

    Kejser, Ulla Bøgvad; Nielsen, Anders Bo; Thirifays, Alex

    2011-01-01

    The Danish Ministry of Culture has funded a project to set up a model for costing preservation of digital materials held by national cultural heritage institutions. The overall objective of the project was to increase cost effectiveness of digital preservation activities and to provide a basis...... for comparing and estimating future cost requirements for digital preservation. In this study we describe an activity-based costing methodology for digital preservation based on the Open Archice Information System (OAIS) Reference Model. Within this framework, which we denote the Cost Model for Digital...... Preservation (CMDP), the focus is on costing the functional entity Preservation Planning from the OAIS and digital migration activities. In order to estimate these costs we have identified cost-critical activities by analysing the functions in the OAIS model and the flows between them. The analysis has been...

  4. Participatory slum upgrading as a disjunctive process in Recife, Brazil

    NARCIS (Netherlands)

    Vries, de Pieter

    2016-01-01

    This article engages with the coproduction of urban space by focusing on a slum upgrading project in Recife, Brazil. It argues that the urban situation is essentially inconsistent, unpredictable and unstable. It documents the history of urban planning in Recife, paying special attention to the

  5. The D0 Upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Abachi, S.; D0 Collaboration

    1995-07-01

    In this paper we describe the approved DO Upgrade detector, and its physics capabilities. The DO Upgrade is under construction and will run during the next Fermilab collider running period in early 1999 (Run II). The upgrade is designed to work at the higher luminosities and shorter bunch spacings expected during this run. The major elements of t he upgrade are: a new tracking system with a silicon tracker, scintillating fiber tracker, a 2T solenoid, and a central preshower detector; new calorimeter electronics; new muon trigger and tracking detectors with new muon system electronics; a forward preshower detector; new trigger electronics and DAQ improvements to handle the higher rates.

  6. UPGRADE OF INSTRUMENTATION FOR PURDUE REACTOR PUR-1, PHASE 3

    International Nuclear Information System (INIS)

    Revankar, S. T.

    2004-01-01

    The major objective of this program is to upgrade and replace instruments and equipment that significantly improve the performance, control and operational capability of the Purdue University nuclear reactor (PUR-1). Under this major objective one project on design and installation of interface cards for channel four detector was considered. This report is the final report and gives the efforts and progress achieved on these projects from August 2002 to July 2004

  7. Film-screen digital radiography

    International Nuclear Information System (INIS)

    Schwenker, R.P.; Eger, H.

    1985-01-01

    The excellent performance of the digital film-screen system as a receptor for projection radiographic data is discussed. An experimental system for obtaining high quality digital radiographic data by laser scanning radiographic films is described. This system is being used to evaluate the clinical utility of various digital image processing algorithms. Future plans include an investigation of quantitative analysis of projection radiographic data. Digital data obtained by film scanning can be used with digital image archiving and communications systems. (author)

  8. Status of TMX upgrade diagnostics construction

    International Nuclear Information System (INIS)

    Hornady, R.S.; Davis, J.C.; Simonen, T.C.

    1981-01-01

    This report describes the status of the initial TMX Upgrade diagnostics and the state of development of additional diagnostics being prepared for later TMX Upgrade experiments. The initial diagnostic instrument set has been described in the TMX Upgrade Proposal. This set is required to get TMX Upgrade operational and to evaluate its initial performance. Additional diagnostic instruments are needed to then carry out the more detailed experiments outlined by the TMX Upgrade program milestones. The relation of these new measurements to the physics program is described in The TMX Upgrade Program Plan

  9. Slum Upgrading and Health Equity.

    Science.gov (United States)

    Corburn, Jason; Sverdlik, Alice

    2017-03-24

    Informal settlement upgrading is widely recognized for enhancing shelter and promoting economic development, yet its potential to improve health equity is usually overlooked. Almost one in seven people on the planet are expected to reside in urban informal settlements, or slums, by 2030. Slum upgrading is the process of delivering place-based environmental and social improvements to the urban poor, including land tenure, housing, infrastructure, employment, health services and political and social inclusion. The processes and products of slum upgrading can address multiple environmental determinants of health. This paper reviewed urban slum upgrading evaluations from cities across Asia, Africa and Latin America and found that few captured the multiple health benefits of upgrading. With the Sustainable Development Goals (SDGs) focused on improving well-being for billions of city-dwellers, slum upgrading should be viewed as a key strategy to promote health, equitable development and reduce climate change vulnerabilities. We conclude with suggestions for how slum upgrading might more explicitly capture its health benefits, such as through the use of health impact assessment (HIA) and adopting an urban health in all policies (HiAP) framework. Urban slum upgrading must be more explicitly designed, implemented and evaluated to capture its multiple global environmental health benefits.

  10. Upgrading the safety of VVER-440/V-230

    International Nuclear Information System (INIS)

    Kelm, P.; Wenk, W.

    1995-01-01

    Besides measures seeking to restore the status as laid down in the project design, especially backfitting measures must be mentioned which serve to ensure component and pipe integrity. Ensuring component integrity is a problem not only of RPV embrittlement, but also of failure prevention. This aspect was not always taken into account properly. Further activities in the field of component integrity will focus on backing the brittle fracture evaluation of the RPV; qualifying the leak-before-breack criterion for the main pipes and in areas with screwed connections; qualifying the program of in-service inspections. Several operators are currently in the process of drafting backfitting programs. The upgrading measures envisaged must be checked as to their balanced nature. In certain plants, the integrity of the RPV coud turn out to be the weak spot in upgrading measures. As a consquence, concepts seeking to achieve upgrading for long periods of time may differ from one location to the next and even between units. Extensive modifications in systems engineering and building structures generally must be evaluated against the expected improvement in safety of the whole plant. (orig.) [de

  11. Recent Upgrade of the Klystron Modulator at SLAC

    International Nuclear Information System (INIS)

    Nguyen, M.N.; Burkhart, C.P.; Lam, B.K.; Morris, B.

    2011-01-01

    The SLAC National Accelerator Laboratory employs 244 klystron modulators on its two-mile-long linear accelerator that has been operational since the early days of the SLAC establishment in the sixties. Each of these original modulators was designed to provide 250 kV, 262 A and 3.5 μS at up to 360 pps using an inductance-capacitance resonant charging system, a modified type-E pulse-forming network (PFN), and a pulse transformer. The modulator internal control comprised of large step-start resistor-contactors, vacuum-tube amplifiers, and 120 Vac relays for logical signals. A major, power-component-only upgrade, which began in 1983 to accommodate the required beam energy of the SLAC Linear Collider (SLC) project, raised the modulator peak output capacity to 360 kV, 420 A and 5.0 μS at a reduced pulse repetition rate of 120 pps. In an effort to improve safety, performance, reliability and maintainability of the modulator, this recent upgrade focuses on the remaining three-phase AC power input and modulator controls. The upgrade includes the utilization of primary SCR phase control rectifiers, integrated fault protection and voltage regulation circuitries, and programmable logic controllers (PLC) -- with an emphasis on component physical layouts for safety and maintainability concerns. In this paper, we will describe the design and implementation of each upgraded component in the modulator control system. We will also report the testing and present status of the modified modulators.

  12. The magnet system of the Tokamak T-15 upgrade

    International Nuclear Information System (INIS)

    Khvostenko, P.P.; Azizov, E.A.; Alfimov, D.E.; Belyakov, V.A.; Bondarchuk, E.N.; Chudnovsky, A.N.; Dokuka, V.N.; Kavin, A.A.; Khayrutdinov, R.R.; Khokhlov, M.V.; Kitaev, B.A.; Krasnov, S.V.; Maximova, I.I.; Labusov, A.N.; Lukash, V.E.; Mineev, A.B.; Muratov, V.P.

    2015-01-01

    Highlights: • T-15U project is the initial technical base for creating fusion neutron sources. • Magnet system of T-15U will confine the hot plasma in the divertor configuration. • Toroidal magnetic field at the plasma axis is 2 T. • T-15U should begin operations in 2016. - Abstract: Presently, the Tokamak T-15 is being upgraded. The magnet system of the Tokamak T-15 upgrade will obtain and confine the hot plasma in the divertor configuration. Plasma parameters are a major radius of 1.48 m, a minor radius of 0.67 m, an elongation of 1.7–1.9 and a triangularity of 0.3–0.4. The magnet system includes the toroidal winding and the poloidal magnet system. The poloidal magnet system generates the divertor with single null and double null magnetic configurations. The power supply system provides the necessary current scenarios in the windings of the magnet system. All elements of the magnet system will be manufactured by the end of 2015. The Tokamak T-15 upgrade should begin operations in 2016.

  13. The magnet system of the Tokamak T-15 upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Khvostenko, P.P., E-mail: ppkhvost@rambler.ru [National Research Centre ‘Kurchatov Institute’, Institute of Tokamak Physics, Kurchatov sq. 1, 123182 Moscow (Russian Federation); Azizov, E.A.; Alfimov, D.E. [National Research Centre ‘Kurchatov Institute’, Institute of Tokamak Physics, Kurchatov sq. 1, 123182 Moscow (Russian Federation); Belyakov, V.A.; Bondarchuk, E.N. [Joint Stock Company “D.V. Efremov Institute of Electrophysical Apparatus”, Metallostroy, 196641 St. Petersburg (Russian Federation); Chudnovsky, A.N.; Dokuka, V.N. [National Research Centre ‘Kurchatov Institute’, Institute of Tokamak Physics, Kurchatov sq. 1, 123182 Moscow (Russian Federation); Kavin, A.A. [Joint Stock Company “D.V. Efremov Institute of Electrophysical Apparatus”, Metallostroy, 196641 St. Petersburg (Russian Federation); Khayrutdinov, R.R. [National Research Centre ‘Kurchatov Institute’, Institute of Tokamak Physics, Kurchatov sq. 1, 123182 Moscow (Russian Federation); Khokhlov, M.V.; Kitaev, B.A.; Krasnov, S.V.; Maximova, I.I.; Labusov, A.N. [Joint Stock Company “D.V. Efremov Institute of Electrophysical Apparatus”, Metallostroy, 196641 St. Petersburg (Russian Federation); Lukash, V.E. [National Research Centre ‘Kurchatov Institute’, Institute of Tokamak Physics, Kurchatov sq. 1, 123182 Moscow (Russian Federation); Mineev, A.B.; Muratov, V.P. [Joint Stock Company “D.V. Efremov Institute of Electrophysical Apparatus”, Metallostroy, 196641 St. Petersburg (Russian Federation); and others

    2015-10-15

    Highlights: • T-15U project is the initial technical base for creating fusion neutron sources. • Magnet system of T-15U will confine the hot plasma in the divertor configuration. • Toroidal magnetic field at the plasma axis is 2 T. • T-15U should begin operations in 2016. - Abstract: Presently, the Tokamak T-15 is being upgraded. The magnet system of the Tokamak T-15 upgrade will obtain and confine the hot plasma in the divertor configuration. Plasma parameters are a major radius of 1.48 m, a minor radius of 0.67 m, an elongation of 1.7–1.9 and a triangularity of 0.3–0.4. The magnet system includes the toroidal winding and the poloidal magnet system. The poloidal magnet system generates the divertor with single null and double null magnetic configurations. The power supply system provides the necessary current scenarios in the windings of the magnet system. All elements of the magnet system will be manufactured by the end of 2015. The Tokamak T-15 upgrade should begin operations in 2016.

  14. 400 MeV upgrade for the Fermilab linac

    International Nuclear Information System (INIS)

    MacLachlan, J.A.

    1989-01-01

    Fermilab has plans for a comprehensive accelerator upgrade to open new possibilities for both the fixed target and collider experimental programs. An early step in this program is to increase the energy of the linac from 200 to 400 MeV by replacing the last four of its nine 201 MHz Alvarez tanks with twenty-eight 805 MHz side-coupled cavity chains operating at about 8 MV/m average axial field. The principal purpose is to reduce the incoherent spacecharge tuneshift at injection into the Booster which currently limits both the brightness of the beam, an important determinant of collider luminosity, and total intensity to produce both the antiprotons for the collider and the beams to fixed target experimental areas. Other consequences of higher Booster injection energy expected to contribute to some degree of higher intensity limits and improved operational characteristics include improved quality of the guide field at injection, reduced frequency swing for the rf systems, and smaller emittance for the injected beam. The linac upgrade project has moved from a 1986 study through a development project including structure models and numerical studies to a full-feature module prototyping starting this year

  15. Urban upgrading for violence prevention in South Africa: Does it ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    The Violence Prevention through Urban Upgrading (VPUU) project, funded jointly by the German Development Bank and the City of Cape Town in South Africa, is a prime example of an evidence-based intervention for violence prevention that was designed to address all urban violence determining factors. The VPUU ...

  16. Upgrading of TREAT experimental capabilities

    International Nuclear Information System (INIS)

    Dickerman, C.E.; Rose, D.; Bhattacharyya, S.K.

    1982-01-01

    The TREAT facility at the Argonne National Laboratory site in the Idaho National Engineering Laboratory is being upgraded to provide capabilities for fast-reactor-safety transient experiments not possible at any other experimental facility. Principal TREAT Upgrade (TU) goal is provision for 37-pin size experiments on energetics of core-disruptive accidents (CDA) in fast breeder reactor cores with moderate sodium void coefficients. this goal requires a significant enhancement of the capabilities of the TREAT facility, specifically including reactor control, hardened neutron spectrum incident on the test sample, and enlarged building. The upgraded facility will retain the capability for small-size experiments of the types currently being performed in TREAT. Reactor building and crane upgrading have been completed. TU schedules call for the components of the upgraded reactor system to be finished in 1984, including upgraded TREAT fuel and control system, and expanded coverage by the hodoscope fuel-motion diagnostics system

  17. Analog-to-digital conversion using custom CMOS analog memory for the EOS time projection chamber

    International Nuclear Information System (INIS)

    Lee, K.L.; Arthur, A.A.; Jones, R.W.; Matis, H.S.; Nakamura, M.; Kleinfelder, S.A.; Ritter, H.G.; Wienman, H.H.

    1990-01-01

    This paper describes the multiplexing scheme of custom CMOS analog memory integrated circuits, 16 channels x 256 cells, into analog to digital converters (ADC's) to handle 15,360 signal channels of a time projection, chamber detector system. Primary requirements of this system are high density, low power and large dynamic range. The analog memory device multiplexing scheme was designed to digitize the information stored in the memory cells. The digitization time of the ADC's and the settling times for the memory unit were carefully interleaved to optimize the performance and timing during the multiplexing operation. This kept the total number of ADC's, a costly and power dissipative component, to an acceptable minimum

  18. Development of a VME multi-processor system for plasma control at the JT-60 Upgrade

    International Nuclear Information System (INIS)

    Takahashi, M.; Kurihara, K.; Kawamata, Y.; Akasaka, H.; Kimura, T.

    1992-01-01

    Design and initial operation results are reported of a VME multi-processor system [1] for plasma control at a large fusion device named 'the JT-60 Upgrade' utilizing three 32-bit MC88100 based RISC computers and VME components. Development of the system was stimulated by faster and more accurate computation requirements for the plasma position and current control. The RISC computers operate at 25 MHz along with two cashe memories named MC88200. We newly developed VME bus modules of up/down counter, analog-to-digital converter and clock pulse generator for measuring magnetic field and coil current and for synchronizing the processing in the three RISCs and direct digital controllers (DDCs) of magnet power supplies. We also evaluated that the speed of the data transfer between the VME bus system and the DDCs through CAMAC highways satisfies the above requirements. In the initial operation of the JT-60 upgrade, it has been proved that the VME multi-processor system well controls the plasma position and current with a sampling period of 250 μsec and a delay of 500 μsec. (author)

  19. The master builders : LAIRAH research on good practice in the construction of digital humanities projects.

    OpenAIRE

    Warwick, C.; Terras, M.; Huntington, P.; Pappa, N.; Galina, I.

    2007-01-01

    This paper describes the results of research carried out during the LAIRAH (Log analysis of Internet Resources in the Arts and Humanities) project (http://www.ucl.ac.uk/slais/circah/lairah/) which is based at UCL’s School of Library Archive and Information Studies. It was a fifteen month study (reporting in October 2006) to discover what influences the long-term sustainability and use of digital resources in the humanities through the analysis and evaluation of real-time use. At Digital Human...

  20. Spin-orbit maps and electron spin dynamics for the luminosity upgrade project at HERA

    International Nuclear Information System (INIS)

    Berglund, G.Z.M.

    2001-09-01

    HERA is the high energy electron(positron)-proton collider at deutsches elektronen-synchrotron (DESY) in Hamburg. Following eight years of successful running, five of which were with a longitudinally spin polarized electron(positron) beam for the HERMES experiment, the rings have now been modified to increase the luminosity by a factor of about five and spin rotators have been installed for the H1 and ZEUS experiments. The modifications involve nonstandard configurations of overlapping magnetic fields and other aspects which have profound implications for the polarization. This thesis addresses the problem of calculating the polarization in the upgraded machine and the measures needed to maintain the polarization. A central topic is the construction of realistic spin-orbit transport maps for the regions of overlapping fields and their implementation in existing software. This is the first time that calculations with such fields have been possible. Using the upgraded software, calculations are presented for the polarization that can be expected in the upgraded machine and an analysis is made of the contributions to depolarization from the various parts of the machine. It is concluded that about 50% polarization should be possible. The key issues for tuning the machine are discussed. The last chapter deals with a separate topic, namely how to exploit a simple unitary model of spin motion to describe electron depolarization and thereby expose a misconception appearing in the literature. (orig.)

  1. Gas Permeation Processes in Biogas Upgrading: A Short Review

    Czech Academy of Sciences Publication Activity Database

    Kárászová, Magda; Sedláková, Zuzana; Izák, Pavel

    2015-01-01

    Roč. 69, č. 10 (2015), s. 1277-1283 ISSN 0366-6352 R&D Projects: GA MŠk(CZ) LD14094; GA MŠk LH14006; GA ČR GA14-12695S Institutional support: RVO:67985858 Keywords : biogas upgrading * memranes * gas permeation Subject RIV: CI - Industrial Chemistry, Chemical Engineering Impact factor: 1.326, year: 2015

  2. Digital TV, the effect of delay when watching football

    NARCIS (Netherlands)

    R.N. Mekuria (Rufael); P.S. Cesar Garcia (Pablo Santiago); D.C.A. Bulterman (Dick)

    2012-01-01

    htmlabstractHearing a neighbor cheer for a goal seconds before you see it can be very annoying. Currently, many people that upgrade their TV service from analog to digital TV are experiencing this. We briefly describe causes of these (relative) delays. To support this with practical evidence, we

  3. Computers Take Flight: A History of NASA's Pioneering Digital Fly-By-Wire Project

    Science.gov (United States)

    Tomayko, James E.

    2000-01-01

    An overview of the NASA F-8 Fly-by Wire project is presented. The project made two significant contributions to the new technology: (1) a solid design base of techniques that work and those that do not, and (2) credible evidence of good flying qualities and the ability of such a system to tolerate real faults and to continue operation without degradation. In 1972 the F-8C aircraft used in the program became he first digital fly-by-wire aircraft to operate without a mechanical backup system.

  4. Upgrades and expansion of the Cornell High Energy Synchrotron Source (CHESS)

    International Nuclear Information System (INIS)

    White, Jeffrey A.

    2000-01-01

    The Cornell High Energy Synchrotron Source (CHESS) is a user-oriented National Facility that provides state-of-the-art synchrotron radiation facilities to scientists worldwide. With major new funding in 1999, we now have 5 ongoing upgrade and expansion projects: 1) a new building addition that will house a new wiggler beamline (CHESS G-line) with three new experimental stations; 2) a new more powerful wiggler source for both A and G beamlines; 3) an upgrade to the A-line optics for better heat load handling and focussing; 4) a rebuild of the F-cave optics room with new optics to handle higher machine current; and 5) a renovation to the user laboratory space surrounding the F1 and F2 crystallography stations. We expect these upgrades and a new G line Cornell faculty collaborating group to raise the level of excitement and productivity at CHESS for many years to come

  5. Control room modernization at Finnish nuclear power plants - Two projects compared

    International Nuclear Information System (INIS)

    Laarni, J.; Norros, L.

    2006-01-01

    The modernization of automation systems and human-machine interfaces is a current issue at both of the two nuclear power plants (i.e., Fortum's Loviisa plant and TVO's Olkiluoto plant) in Finland. Since the plants have been launched in the 1970's or 1980's, technology is in part old-fashioned and needs to be renewed. At Olkiluoto upgrades of the turbine operator systems have already been conducted; at Loviisa the first phase of the modernization project has just started. Basically, there is a question of the complete digitalization of the information streams at the two plants, and transition from a conventional hard-wired or hybrid control room to a screen-based one. The new human-machine interfaces will comprise new technology, such as PC workstations, soft control, touch screens and large-screen overall displays. The modernization of human-system interfaces is carried out in a stepwise manner at both plants. At both plants the main driver has not been the need to renew the user interfaces of the control room, but the need to upgrade the automation systems. In part because of this, there is a lack of a systematic top-down approach in which different aspects of human factors (HF) engineering are considered in relationship to higher level goals. Our aim here is to give an overview description of the control room modernization projects at the two plants and provide a preliminary evaluation of their progress to date. The projects are also compared, for example, in terms of duration, scope and phasing, and who is responsible for the realization of the project. In addition, we also compare experiences from the Finnish projects to experiences from similar projects abroad. The main part of the data used in this study is based on designers' and project members' interviews. (authors)

  6. Gold, power, protest: Digital and social media and protests against large-scale mining projects in Colombia

    OpenAIRE

    Specht, D.; Ros-Tonen, M.A.F.

    2017-01-01

    Colombia’s Internet connectivity has increased immensely. Colombia has also ‘opened for business’, leading to an influx of extractive projects to which social movements object heavily. Studies on the role of digital media in political mobilisation in developing countries are still scarce. Using surveys, interviews, and reviews of literature, policy papers, website and social media content, this study examines the role of digital and social media in social movement organisations and asks how i...

  7. Repairing and Upgrading Your PC

    CERN Document Server

    Thompson, Robert

    2009-01-01

    Repairing and Upgrading Your PC delivers start-to-finish instructions, simple enough for even the most inexperienced PC owner, for troubleshooting, repairing, and upgrading your computer. Written by hardware experts Robert Bruce Thompson and Barbara Fritchman Thompson, this book covers it all: how to troubleshoot a troublesome PC, how to identify which components make sense for an upgrade, and how to tear it all down and put it back together. This book shows how to repair and upgrade all of your PC's essential components.

  8. CMS Phase II Upgrade Scope Document

    CERN Document Server

    Butler, J; Klute, M; Mans, J; Silvestris, L; on behalf of the CMS, Collaboration; CERN. Geneva. The LHC experiments Committee; LHCC

    2015-01-01

    The High-Luminosity LHC (HL-LHC) has been identified as the highest priority program in High Energy Physics by both the European Strategy Group and the US Particle Physics Project Prioritization Panel. To fulfil the full potential of this program, which includes the study of the nature of the Higgs boson, the investigation of the properties of any newly discovered particles in the upcoming LHC runs, and the extension of the mass reach for further discoveries, an integrated luminosity of 3000 fb-1 will have to be accumulated by the end of the program. In preparation for operation at the HL-LHC , CMS has documented the necessary upgrades and their expected costs in a Technical Proposal submitted to the CERN LHC Committee (LHCC) in mid-2015. The material presented in the current “Scope Document” provides additional information to assist the LHCC and the CERN Resource Review Board (RRB) in their review of the CMS upgrade. The document commences with a summary of the process followed to develop the scope of t...

  9. Digital Preservation in Open-Source Digital Library Software

    Science.gov (United States)

    Madalli, Devika P.; Barve, Sunita; Amin, Saiful

    2012-01-01

    Digital archives and digital library projects are being initiated all over the world for materials of different formats and domains. To organize, store, and retrieve digital content, many libraries as well as archiving centers are using either proprietary or open-source software. While it is accepted that print media can survive for centuries with…

  10. Coastal California Digital Imagery

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This digital ortho-imagery dataset is a survey of coastal California. The project area consists of approximately 3774 square miles. The project design of the digital...

  11. PEP-II Transverse Feedback Electronics Upgrade

    International Nuclear Information System (INIS)

    Weber, J.; Chin, M.; Doolittle, L.; Akre, R.

    2005-01-01

    The PEP-II B Factory at the Stanford Linear Accelerator Center (SLAC) requires an upgrade of the transverse feedback system electronics. The new electronics require 12-bit resolution and a minimum sampling rate of 238 Msps. A Field Programmable Gate Array (FPGA) is used to implement the feedback algorithm. The FPGA also contains an embedded PowerPC 405 (PPC-405) processor to run control system interface software for data retrieval, diagnostics, and system monitoring. The design of this system is based on the Xilinx(R) ML300 Development Platform, a circuit board set containing an FPGA with an embedded processor, a large memory bank, and other peripherals. This paper discusses the design of a digital feedback system based on an FPGA with an embedded processor. Discussion will include specifications, component selection, and integration with the ML300 design

  12. PEP-II Transverse Feedback Electronics Upgrade

    International Nuclear Information System (INIS)

    Weber, J.M.; Chin, M.J.; Doolittle, L.R.; Akre, R.

    2006-01-01

    The PEP-II B Factory at the Stanford Linear Accelerator Center (SLAC) requires an upgrade of the transverse feedback system electronics. The new electronics require 12-bit resolution and a minimum sampling rate of 238 Msps. A Field Programmable Gate Array (FPGA) is used to implement the feedback algorithm. The FPGA also contains an embedded PowerPC 405 (PPC-405) processor to run control system interface software for data retrieval, diagnostics, and system monitoring. The design of this system is based on the Xilinx(reg s ign) ML300 Development Platform, a circuit board set containing an FPGA with an embedded processor, a large memory bank, and other peripherals. This paper discusses the design of a digital feedback system based on an FPGA with an embedded processor. Discussion will include specifications, component selection, and integration with the ML300 design

  13. PEP-II Transverse Feedback Electronics Upgrade

    CERN Document Server

    Weber, Jonah; Chin, Michael; Doolittle, Lawrence

    2005-01-01

    The PEP-II B Factory at the Stanford Linear Accelerator Center (SLAC) requires an upgrade of the transverse feedback system electronics. The new electronics require 12-bit resolution and a minimum sampling rate of 238 Msps. A Field Programmable Gate Array (FPGA) is used to implement the feedback algorithm. The FPGA also contains an embedded PowerPC 405 (PPC-405) processor to run control system interface software for data retrieval, diagnostics, and system monitoring. The design of this system is based on the Xilinx® ML300 Development Platform, a circuit board set containing an FPGA with an embedded processor, a large memory bank, and other peripherals. This paper discusses the design of a digital feedback system based on an FPGA with an embedded processor. Discussion will include specifications, component selection, and integration with the ML300 design.

  14. Plasma control system upgrade and increased plasma stability in NSTX

    Energy Technology Data Exchange (ETDEWEB)

    Mastrovito, D., E-mail: dmastrovito@pppl.go [Princeton Plasma Physics Laboratory, P.O. Box 451 Princeton, NJ 08543 (United States); Gates, D.; Gerhard, S.; Lawson, J.; Ludescher-Furth, C.; Marsala, R. [Princeton Plasma Physics Laboratory, P.O. Box 451 Princeton, NJ 08543 (United States)

    2010-07-15

    Plasma control on the National Spherical Torus Experiment (NSTX) was previously accomplished using eight 333 MHz G4 processors built by Sky computers. Several planned improvements and additional control algorithms required significant upgrades to our real-time control computers and real-time data acquisition infrastructure. Several in-house modules have been designed and implemented including: the digital time stamp module (DITS) and for digital/analog front panel data port (FPDP) output, the FPDP output module digital/analog (FOMD/A). Standard Linux based Intel computers perform the real-time control tasks and InfiniBand as been employed for communication between a user-accessible 'host' server and the real-time computer. In addition to several independent real-time processes the General Atomics developed PCS (Bell (2006) ) system infrastructure continues to be used on NSTX. While maintaining previous functionality, improvements in the control system software include: an RWM feedback algorithm, beta feedback NBI control, more comprehensive error logging and trapping, more user-friendly interface, more complete archiving and restoring functionality, and better status reporting and diagnostic tools. Once completed, we succeeded in increasing overall plasma stability and decreasing control system latency by several times.

  15. Upgrade and extension of the climate station at DTU Byg

    DEFF Research Database (Denmark)

    Andersen, Elsa; Dragsted, Janne; Kristensen, Troels V.

    In the period 2013-2014 the projectUpgrade and Extension of the Climate Station at DTU Byg” is carried out at DTU Byg. The aim of the project is to renew the hardware and the software for data acquisition and monitoring, exchange cables and cable connections in order to avoid interference...... of electrical noise from the surroundings and exchange worn out equipment. Further, the aim is to make measured data from the climate station easily available for the users....

  16. Equipment and performance upgrade of compact nuclear simulator

    Energy Technology Data Exchange (ETDEWEB)

    Park, Jae Chang; Kwon, Kee Choon; Lee, Dong Young; Cha, Kyung Ho; Park, Won Man; Song, Soon Ja; Lee, Jung Woon; Oh, In Seok; Moon, Byung Sou; Ham, Chang Shik; Seh, Kyung Won; Joo, Young Chang; Lee, Eui Jin

    1999-12-01

    We developed techniques for upgrading nuclear power plant simulators that lost some function due to aging and obsolescence of parts. This project will provide a guidance for resolving the problems with aged simulators. We transplanted the simulation code operated in Macro-VAX II into the HP workstation with operating system version 10.20. If further research is proceeded, it will be possible to build simulator system on PCs. (author)

  17. Krsko NPP Quality Assurance Plan Application to Nuclear Safety Upgrade Projects (PCFV System and PAR System)

    International Nuclear Information System (INIS)

    Biscan, Romeo; Fifnja, Igor

    2014-01-01

    Nuklearna Elektrarna Krsko (NEK) has undertaken Nuclear Safety Upgrade Projects as a safety improvement driven by the lessons learned from the Fukushima-Daiichi Accident. Among other projects, new modification 1008-VA-L Passive Containment Filtered Vent (PCFV) System has been installed which acts as the last barrier minimizing the release of radioactive material into the environment in case of failure of all safety systems, and to insure containment integrity during beyond design basis accidents (BDBA). In addition, modification 1002-GH-L Severe Accident Hydrogen Control System (PAR) has been implemented to prevent and mitigate the consequences of explosive gas generation (hydrogen and carbon monoxide) in case of reactor core melting. To ensure containment integrity for all design basis accidents (DBA) and BDBA conditions, NEK has eliminated existing safety-related electrical recombiners, replaced them with two safety-related passive autocatalytic recombiners (PARs) and added 20 new PARs designed for the BDBA conditions. Krsko NPP Quality Assurance Plan has been applied to Nuclear Safety Upgrade Projects (PCFV System and PAR System) through the following activities: · Internal audit of modification process was performed. · Supplier audits were performed to evaluate QA program efficiency of the main design organization and engineering organizations. · Evaluation and approval of Suppliers were performed. · QA engineer was involved in the review and approval of 1008-VA-L and 1002-GH-L modification documentation (Conceptual Design Package, Design Modification Package, Installation Package, Field Design Change Request, Problem/Deficiency Report, and Final Documentation Package). · Purchasing documentation for modifications 1008-VA-L and 1002-GH-L (technical specifications, purchase orders) has been verified and approved by QA. · QA and QC engineers were involved in oversight of production and testing of the new 1008-VA-L and 1002-GH-L plant components.

  18. Climate adaptation of buildings through MOM- and upgrading - State of the art and research needs

    OpenAIRE

    Grynning, Steinar; Wærnes, Elisabeth Gaal; Kvande, Tore; Time, Berit

    2017-01-01

    This study presents an overview of research initiatives and projects addressing climate adaption in management operation and maintenance (MOM) and upgrade of existing buildings. The aim was to identify knowledge needs and research demand necessary for decision makers to address climate adaptation in their MOM and upgrade plans. Climate adaptation of buildings in the Norwegian climate very much concerns increased moisture robustness and risk reduction of moisture damages. Thus, a strong focus ...

  19. Timing distribution and Data Flow for the ATLAS Tile Calorimeter Phase II Upgrade

    CERN Document Server

    AUTHOR|(SzGeCERN)713745; The ATLAS collaboration

    2016-01-01

    The Hadronic Tile Calorimeter (TileCal) detector is one of the several subsystems composing the ATLAS experiment at the Large Hadron Collider (LHC). The LHC upgrade program plans an increase of order five times the LHC nominal instantaneous luminosity culminating in the High Luminosity LHC (HL-LHC). In order to accommodate the detector to the new HL-LHC parameters, the TileCal read out electronics is being redesigned introducing a new read out strategy with a full-digital trigger system. In the new read out architecture, the front-end electronics allocates the MainBoards and the DaughterBoards. The MainBoard digitizes the analog signals coming from the PhotoMultiplier Tubes (PMTs), provides integrated data for minimum bias monitoring and includes electronics for PMT calibration. The DaughterBoard receives and distributes Detector Control System (DCS) commands, clock and timing commands to the rest of the elements of the front-end electronics, as well as, collects and transmits the digitized data to the back-e...

  20. Upgrade of the ATLAS hadronic Tile calorimeter for the High luminosity LHC

    CERN Document Server

    Mlynarikova, Michaela; The ATLAS collaboration

    2017-01-01

    The Tile Calorimeter (TileCal) is the hadronic calorimeter covering the central region of the ATLAS detector at the LHC. It is a sampling calorimeter consisting of alternating thin steel plates and scintillating tiles. Wavelength shifting fibers coupled to the tiles collect the produced light and are read out by photomultiplier tubes. Currently, an analog sum of the processed signal of several photomultipliers serves as input to the first level of trigger. Photomultiplier signals are then digitized and stored on detector and are only transferred off detector once the first trigger acceptance has been confirmed. The Large Hadron Collider (LHC) has envisaged a series of upgrades towards a High Luminosity LHC (HL-LHC) delivering five times the LHC nominal instantaneous luminosity. The ATLAS Phase II upgrade, in 2024, will accommodate the detector and data acquisition system for the HL-LHC. In particular, TileCal will undergo a major replacement of its on- and off-detector electronics. All signals will be digitiz...

  1. Tests with beam setup of the TileCal Phase-II upgrade electronics

    CERN Document Server

    Hlaluku, Dingane Reward; The ATLAS collaboration

    2017-01-01

    The LHC has planned a series of upgrades culminating in the High Luminosity LHC (HL-LHC) which will have an average luminosity 5-7 times larger than the nominal Run-2 value. The ATLAS Tile Calorimeter (TileCal) will undergo an upgrade to accommodate to the HL-LHC parameters. The TileCal electronics both on- and off-detector will be completely redesigned and a new readout architecture will be adopted. The photomultiplier signals will be digitised and transferred to the TileCal PreProcessors (PPr) located off-detector for every bunch crossing. Then, the PPr will provide preprocessed digital data to the first level trigger with improved spatial granularity and energy resolution with respect to the current analog trigger signals. We plan to insert one TileCal module instrumented with the new electronics in the real detector to evaluate and qualify the new readout and trigger concepts in the overall ATLAS data acquisition system. This new drawer, so-called Hybrid Demonstrator, must provide analog trigger signal fo...

  2. Silicon strip detectors for the ATLAS HL-LHC upgrade

    CERN Document Server

    Gonzalez Sevilla, S; The ATLAS collaboration

    2011-01-01

    The LHC upgrade is foreseen to increase the ATLAS design luminosity by a factor ten, implying the need to build a new tracker suited to the harsh HL-LHC conditions in terms of particle rates and radiation doses. In order to cope with the increase in pile-up backgrounds at the higher luminosity, an all silicon detector is being designed. To successfully face the increased radiation dose, a new generation of extremely radiation hard silicon detectors is being designed. We give an overview of the ATLAS tracker upgrade project, in particular focusing on the crucial innermost silicon strip layers. Results from a wide range of irradiated silicon detectors for the strip region of the future ATLAS tracker are presented. Layout concepts for lightweight yet mechanically very rigid detector modules with high service integration are shown.

  3. SRS control system upgrade requirements

    International Nuclear Information System (INIS)

    Hill, L.F.

    1998-01-01

    This document defines requirements for an upgrade of the Sodium Removal System (SRS) control system. The upgrade is being performed to solve a number of maintainability and operability issues. The upgraded system will provide the same functions, controls and interlocks as the present system, and in addition provide enhanced functionality in areas discussed in this document

  4. H-1 Upgrades (4BW/4BN) (H-1 Upgrades)

    Science.gov (United States)

    2015-12-01

    automatic blade fold of the new composite rotor blades, new performance matched transmissions, a new four-bladed tail rotor and drive system, upgraded...Upgrades December 2015 SAR March 18, 2016 10:59:17 UNCLASSIFIED 4 Col Steven Girard PMA-276 USMC Light/Attack Helicopter Program Executive Officer...attack helicopter is to provide rotary wing close air support, anti-armor, armed escort, armed/visual reconnaissance and fire support coordination

  5. Initiating New Prospects of Rural Science Popularization in the Digital Media Era

    Directory of Open Access Journals (Sweden)

    Jun Li

    2014-04-01

    Full Text Available The development of digital media has brought a new challenge to existing science popularization in the rural areas. In this paper, new experience of rural science popularization on both traditional and digital media in Zhejiang province was introduced. We proposed several strategies for rural science popularization in the digital media era: First, we should strengthen the utilization of traditional platforms such as print media and broadcast and TV media. Then, digital media based on Internet should also be used for science popularization. Last but not least, we should also try to use “the fifth media” to upgrade existing platforms and create new Internet media channels.

  6. Digital archives. Alcune note

    Directory of Open Access Journals (Sweden)

    Francesca Zanella

    2014-12-01

    Full Text Available MoRE is a digital native museum where projects of artworks are exposed, and also a digital archive where documents about art projectsare collected. MoRE is a multi-layered platform where artists, curators, art historians confront each other collecting art projects, organizing their documentation and defining tools for the communication and surveys on the public. In this paper some critical referencesare identified, that constitute a model for the project as they reflect on the impact of the digital dimension on the transformation of the museum and archive.

  7. EUB Decision 2006-112 : Suncor Energy Inc. application for expansion of an oil sands mine (North Steepbank mine extension) and a bitumen upgrading facility (Voyageur Upgrader) in the Fort McMurray area

    International Nuclear Information System (INIS)

    2006-01-01

    Suncor Energy Inc. filed 2 applications to the Alberta Energy and Utilities Board for their proposed North Steepbank Mine Extension and Voyageur Upgrading Facility in the Fort McMurray area. This document provided an outline to the board of the location of the proposed projects, along with technical details concerning sulphur recovery, coke gasification, and by-product storage and use. The applications shared a common environmental impact assessment report, which presented details of tailings management programs; environmental effects to air, terrestrial resources, surface water, and groundwater; potential health effects to human populations; and traditional land use and ecological knowledge of the lands in the areas of the proposed upgrades. The social and economic effects of the projects were considered by the board, as well as the efforts of Suncor to engage with public consultation processes. It was noted that the projects are expected to provide $7.1 billion in federal taxes paid over the life of the project, in addition to $3.6 billion in provincial taxes and a further $23 million in municipal taxes. Details of several interventions filed by various First Nations groups were presented. It was noted that the Oil Sands Environmental Coalition (OSEC) has filed interventions stating concerns over consultation practices; cumulative effects; environmental monitoring; water usage; reclamation policies; and socio-economic issues. Various other groups have expressed concerns over the impacts of rapid development in the region and the subsequent strains on public infrastructure, housing and community resources. While the project is expected to provide employment, the current labour shortage in the region means that further development will be a disadvantage rather than a benefit to the communities in the region. Although a number of conditions were placed on Suncor before full acceptance of the project could be given, the board concluded that the Voyageur project was

  8. LHC luminosity upgrade detector challenges

    CERN Multimedia

    CERN. Geneva; de Roeck, Albert; Bortoletto, Daniela; Wigmans, Richard; Riegler, Werner; Smith, Wesley H

    2006-01-01

    LHC luminosity upgrade: detector challenges The upgrade of the LHC machine towards higher luminosity (1035 cm -2s-1) has been studied over the last few years. These studies have investigated scenarios to achieve the increase in peak luminosity by an order of magnitude, as well as the physics potential of such an upgrade and the impact of a machine upgrade on the LHC DETECTORS. This series of lectures will cover the following topics: • Physics motivation and machine scenarios for an order of magnitude increase in the LHC peak luminosity (lecture 1) • Detector challenges including overview of ideas for R&D programs by the LHC experiments: tracking and calorimetry, other new detector developments (lectures 2-4) • Electronics, trigger and data acquisition challenges (lecture 5) Note: the much more ambitious LHC energy upgrade will not be covered

  9. The JET PCU project: An international plasma control project

    International Nuclear Information System (INIS)

    Sartori, F.; Crisanti, F.; Albanese, R.; Ambrosino, G.; Toigo, V.; Hay, J.; Lomas, P.; Rimini, F.; Shaw, S.R.; Luchetta, A.; Sousa, J.; Portone, A.; Bonicelli, T.; Ariola, M.; Artaserse, G.; Bigi, M.; Card, P.; Cavinato, M.; De Tommasi, G.; Gaio, E.

    2008-01-01

    This paper describes the new JET enhancement project 'Plasma Control Upgrade' (PCU). Initially aimed at an overhaul of JET plasma control capabilities it was eventually focused on improving the vertical stabilisation (VS) system ability to recover from large ELM (edge localised mode) perturbations. The paper describes the results of the first two years where the activity was aimed principally at researching a solution that could be implemented within the timing and budget constraints. A very important task was that of improving the modelling of JET plasma, iron core and passive structures. Using dedicated experiments, the models were progressively refined until it was possible not just to explain the experimental data but predict the VS system behaviour. At the same time the project team studied the best options for power supply (PS) and control system upgrades and evaluated whether a change of turns in the stabilisation coil was desirable and possible. A new fast radial field power supply is now being ordered and the VS control system is being upgraded

  10. The CMS Data Acquisition - Architectures for the Phase-2 Upgrade

    CERN Document Server

    Andre, Jean-Marc Olivier; Branson, James; Brummer, Philipp Maximilian; Chaze, Olivier; Cittolin, Sergio; Contescu, Cristian; Craigs, Benjamin Gordon; Darlea, Georgiana Lavinia; Deldicque, Christian; Demiragli, Zeynep; Dobson, Marc; Doualot, Nicolas; Erhan, Samim; Fulcher, Jonathan F; Gigi, Dominique; Michail Gladki; Glege, Frank; Gomez Ceballos, Guillelmo; Hegeman, Jeroen Guido; Holzner, Andre Georg; Janulis, Mindaugas; Jimenez Estupinan, Raul; Masetti, Lorenzo; Meijers, Franciscus; Meschi, Emilio; Mommsen, Remigius; Morovic, Srecko; O'Dell, Vivian; Orsini, Luciano; Paus, Christoph Maria Ernst; Petrova, Petia; Pieri, Marco; Racz, Attila; Reis, Thomas; Sakulin, Hannes; Schwick, Christoph; Simelevicius, Dainius; Zejdl, Petr

    2017-01-01

    The upgraded High Luminosity LHC, after the third Long Shutdown (LS3), will provide an instantaneous luminosity of $7.5\\times10^{34}$ cm$^{-2} s^{-1}$ (levelled), at the price of extreme pileup of up to 200 interactions per crossing. In LS3, the CMS Detector will also undergo a major upgrade to prepare for the phase-2 of the LHC physics program, starting around 2025. The upgraded detector will be read out at an unprecedented data rate of up to 50 Tb/s and an event rate of 750 kHz. Complete events will be analysed by software algorithms running on standard processing nodes, and selected events will be stored permanently at a rate of up to 10 kHz for offline processing and analysis. In this paper we discuss the baseline design of the DAQ and HLT systems for the phase-2, taking into account the projected evolution of high speed network fabrics for event building and distribution, and the anticipated performance of general purpose CPU. Implications on hardware and infrastructure requirements for the DAQ "data cen...

  11. Fire protection upgrading of four Russian 440/230 VVER units

    International Nuclear Information System (INIS)

    Corsini, G.; Yelfimov, S.

    1995-01-01

    The main goal of TACIS 3.6 a project funded by the Commission of the European Communities (CEC), was the front-end engineering for upgrading the Fire Protection System (FPS) of the safety-related equipment of Novovoronezh, Units 3 and 4, and Kola, Units 1 and 2, VVER 440/230 nuclear power plants. As a first step, all the safety-related equipment had to be identified, evaluation criteria had to be established and the existing FPS reviewed against the criteria. In the second step, the selection of the upgrading measures, depending on feasibility and cost estimate, has been accomplished, room by room. The third step, carried out on schedule and completed end July 95, has been essentially the preparation of the Technical Specifications for procurement of the needed equipment including remaining detail engineering. The Russian sub-contactor Atom Energo Project (AEP), who have been the designers of these older NPP s, have done the work with the Italian Ansaldo as the consultants of their Russian colleagues. Practical aspects of the engineering work are discussed and examples of improvements selected for retrofitting described. (author)

  12. Upgrade of the ATLAS Tile Calorimeter Electronics

    CERN Document Server

    Carrio, F; The ATLAS collaboration

    2014-01-01

    This presentation summarizes the status of the on-detector and off-detector electronics developments for the Phase II Upgrade of the ATLAS Tile Calorimeter at the LHC scheduled around 2024. A demonstrator prototype for a slice of the calorimeter including most of the new electronics is planned to be installed in ATLAS in middle 2014 during the Long Shutdown. For the on-detector readout, three different front-end boards (FEB) alternatives are being studied: a new version of the 3-in-1 card, the QIE chip and a dedicated ASIC called FATALIC. The MainBoard will provide communication and control to the FEBs and the DaughterBoard will transmit the digitized data to the off-detector electronics in the counting room, where the sROD will perform processing tasks on them.

  13. Cryogenic digital data links for the liquid argon time projection chamber

    International Nuclear Information System (INIS)

    Liu, T; Gong, D; Liu, C; Xiang, A C; Ye, J; Hou, S; Su, D-S; Teng, P-K

    2012-01-01

    In this paper we present the cryogenic functionality of the components of data links for the Liquid Argon Time Projection Chamber (LArTPC), a potential far site detector technology of the Long-Baseline Neutrino Experiment (LBNE). We have confirmed that an LVDS driver can drive a 20-meter CAT5E twisted pair up to 1 gigabit per second at the liquid nitrogen temperature (77 K). We have verified that a commercial-off-the-shelf (COTS) serializer, a laser diode driver, laser diodes, optical fibers and connectors, and field-programming gate arrays (FPGA's) continue to function at 77 K. A variety of COTS resistors and capacitors have been tested at 77 K. All tests we have conducted show that the cryogenic digital data links for the liquid argon time projection chamber are promising.

  14. The LHCb Muon Upgrade

    CERN Multimedia

    Cardini, A

    2013-01-01

    The LHCb collaboration is currently working on the upgrade of the experiment to allow, after 2018, an efficient data collection while running at an instantaneous luminosity of 2x10$^{33}$/cm$^{-2}$s$^{-1}$. The upgrade will allow 40 MHz detector readout, and events will be selected by means of a very flexible software-based trigger. The muon system will be upgraded in two phases. In the first phase, the off-detector readout electronics will be redesigned to allow complete event readout at 40 MHz. Also, part of the channel logical-ORs, used to reduce the total readout channel count, will be removed to reduce dead-time in critical regions. In a second phase, higher-granularity detectors will replace the ones installed in highly irradiated regions, to guarantee efficient muon system performances in the upgrade data taking conditions.

  15. Evaluation of smartphone-based interaction techniques in a CAVE in the context of immersive digital project review

    Science.gov (United States)

    George, Paul; Kemeny, Andras; Colombet, Florent; Merienne, Frédéric; Chardonnet, Jean-Rémy; Thouvenin, Indira Mouttapa

    2014-02-01

    Immersive digital project reviews consist in using virtual reality (VR) as a tool for discussion between various stakeholders of a project. In the automotive industry, the digital car prototype model is the common thread that binds them. It is used during immersive digital project reviews between designers, engineers, ergonomists, etc. The digital mockup is also used to assess future car architecture, habitability or perceived quality requirements with the aim to reduce using physical mockups for optimized cost, delay and quality efficiency. Among the difficulties identified by the users, handling the mockup is a major one. Inspired by current uses of nomad devices (multi-touch gestures, IPhone UI look'n'feel and AR applications), we designed a navigation technique taking advantage of these popular input devices: Space scrolling allows moving around the mockup. In this paper, we present the results of a study we conducted on the usability and acceptability of the proposed smartphone-based interaction metaphor compared to traditional technique and we provide indications of the most efficient choices for different use-cases accordingly. It was carried out in a traditional 4-sided CAVE and its purpose is to assess a chosen set of interaction techniques to be implemented in Renault's new 5-sides 4K x 4K wall high performance CAVE. The proposed new metaphor using nomad devices is well accepted by novice VR users and future implementation should allow an efficient industrial use. Their use is an easy and user friendly alternative of the existing traditional control devices such as a joystick.

  16. Kansas State University accelerator laboratory upgrade

    International Nuclear Information System (INIS)

    Richard, P.

    1989-01-01

    The J.R. Macdonald Laboratory is undergoing a major upgrade of its facilities and capabilities. The laboratory is dedicated to the study of ion-atom collisions using highly charged ions from accelerators and/or ion sources. The mainstay of the laboratory over the last two decades has been a 6 MV tandem accelerator. It has been used to produce one- to a few-MeV/u highly charged ions for studying high energy atomic collisions, and to produce recoil ions from ocllisions with projectile ions for studying low energy atomic collisions. In order to enhance the capabilities of studying atomic collisions in these two energy regimes, we are constructing a superconducting LINAC booster to the tandem, and a stand-alone CRYEBIS source. The project, which is funded by the US Department of Energy, began in May 1985 with a May 1989 completion schedule. The upgrade includes a building addition, funded by the State of Kansas, to house the new facilities. The LINAC consists of a time-superbunching module, followed by three large cryostat modules each containing four superconducting resonators, and followed by an energy-rebunching module. The resonators are the split-ring superconducting Nb type designed and constructed at Argonne National Laboratory, and are presently being tested at KSU. The CRYEBIS source, which consists of a 1 m long 5 T superconducting solenoid with a high degree of straightness, is in the final stages of assembly. We have in operation a new computer network for data acquisition and analysis. A progress report on the status of the upgrade is presented. (orig.)

  17. Upgrade of the radio frequency quadrupole cooler and buncher for the HIE-ISOLDE project

    CERN Document Server

    Babcock, Carla

    2013-01-01

    The upgrade to the ISOLDE facility, HIE-ISOLDE, will include an upgrade to the RFQCB (radio frequency quadrupole cooler and buncher), the focus of which will be fixing the problems of alignment with the current machine, improving the integrity of the vacuum system, stabilizing the internal gas pressure, and the changes associated with a new position. The beam passage inside the RFQCB has been simulated with an independent code to highlight the importance of the internal gas pressure, to motivate design changes in the new RFQCB and to explain ways to improve the performance of the current machine. The suspected misalignment of ISCOOL has been quantified, and, using a simulation of ions passing through the external injection electrodes, the effect of the misalignment on machine acceptance has been detailed. Plans for the future RFQCB test stand and HIE-ISOLDE installation have been outlined. (C) 2013 Elsevier B.V. All rights reserved.

  18. Paloma co-op rehabilitation case study examining the challenges to energy upgrades

    Energy Technology Data Exchange (ETDEWEB)

    Legge, C.; Schwartz, J. [JRS Enginerring LTd., Burnaby, (Canada)

    2010-07-01

    Paloma Cooperative consists of two wood-frame multi-unit residential buildings located in the Commercial Drive area of Vancouver, British Columbia. In 2006, investigations showed that the balconies were severely deteriorated due to water ingress. The complex was deemed to have suffered from a premature building failure. A complete building envelope remediation was necessary. This paper presented the challenges of incorporating energy efficient and sustainable design upgrades during a rehabilitation project, using the Paloma Cooperative as a case study. The various design options, the technical limitations, the financial analysis, the modelling assumptions and the involvement of third party lenders were presented. Initial air-leakage rates were measured and an energy modeling was completed using RETScreen software. Three scenarios were modeled to determine what effect different energy upgrades would have on the energy savings. This paper showed that cost was the biggest challenge faced by the Paloma Cooperative energy upgrade.

  19. Design and Validation of Control Room Upgrades Using a Research Simulator Facility

    Energy Technology Data Exchange (ETDEWEB)

    Ronald L. Boring; Vivek Agarwal; Jeffrey C. Joe; Julius J. Persensky

    2012-11-01

    Since 1981, the United States (U.S.) Nuclear Regulatory Commission (NRC) [1] requires a plant- specific simulator facility for use in training at U.S. nuclear power plants (NPPs). These training simulators are in near constant use for training and qualification of licensed NPP operators. In the early 1980s, the Halden Man-Machine Laboratory (HAMMLab) at the Halden Reactor Project (HRP) in Norway first built perhaps the most well known set of research simulators. The HRP offered a high- fidelity simulator facility in which the simulator is functionally linked to a specific plant but in which the human-machine interface (HMI) may differ from that found in the plant. As such, HAMMLab incorporated more advanced digital instrumentation and controls (I&C) than the plant, thereby giving it considerable interface flexibility that researchers took full advantage of when designing and validating different ways to upgrade NPP control rooms. Several U.S. partners—the U.S. NRC, the Electrical Power Research Institute (EPRI), Sandia National Laboratories, and Idaho National Laboratory (INL) – as well as international members of the HRP, have been working with HRP to run control room simulator studies. These studies, which use crews from Scandinavian plants, are used to determine crew behavior in a variety of normal and off-normal plant operations. The findings have ultimately been used to guide safety considerations at plants and to inform advanced HMI design—both for the regulator and in industry. Given the desire to use U.S. crews of licensed operators on a simulator of a U.S. NPP, there is a clear need for a research simulator facility in the U.S. There is no general-purpose reconfigurable research oriented control room simulator facility in the U.S. that can be used for a variety of studies, including the design and validation of control room upgrades.

  20. Setting priorities for safeguards upgrades

    International Nuclear Information System (INIS)

    Al-Ayat, R.A.; Judd, B.R.; Patenaude, C.J.; Sicherman, A.

    1987-01-01

    This paper describes an analytic approach and a computer program for setting priorities among safeguards upgrades. The approach provides safeguards decision makers with a systematic method for allocating their limited upgrade resources. The priorities are set based on the upgrades cost and their contribution to safeguards effectiveness. Safeguards effectiveness is measured by the probability of defeat for a spectrum of potential insider and outsider adversaries. The computer program, MI$ER, can be used alone or as a companion to ET and SAVI, programs designed to evaluate safeguards effectiveness against insider and outsider threats, respectively. Setting the priority required judgments about the relative importance (threat likelihoods and consequences) of insider and outsider threats. Although these judgments are inherently subjective, MI$ER can analyze the sensitivity of the upgrade priorities to these weights and determine whether or not they are critical to the priority ranking. MI$ER produces tabular and graphical results for comparing benefits and identifying the most cost-effective upgrades for a given expenditure. This framework provides decision makers with an explicit and consistent analysis to support their upgrades decisions and to allocate the safeguards resources in a cost-effective manner

  1. AREUS - a software framework for the ATLAS Readout Electronics Upgrade Simulation

    CERN Document Server

    Horn, Philipp; The ATLAS collaboration

    2018-01-01

    The design of readout electronics for the LAr calorimeters of the ATLAS detector to be operated at the future High-Luminosity LHC (HL-LHC) requires a detailed simulation of the full readout chain in order to find optimal solutions for the analog and digital processing of the detector signals. Due to the long duration of the LAr calorimeter pulses relative to the LHC bunch crossing time, out-of-time signal pile-up needs to be taken intoaccountandrealisticpulsesequencesmustbesimulatedtogetherwiththeresponseoftheelectronics. For this purpose, the ATLAS Readout Electronics Upgrade Simulation framework (AREUS) has been developed based on the Observer design pattern to provide a fast and flexible simulation tool. Energy deposits in the LAr calorimeters from fully simulated HL-LHC collision events are taken as input. Simulated and measured analog pulse shapes proportional to these energies are then combined in discrete time series with proper representation of electronics noise. Analog-to-digital conversion, gain se...

  2. The CMS Pixel Detector Upgrade and R\\&D for the High Luminosity LHC

    CERN Document Server

    Viliani, Lorenzo

    2017-01-01

    The High Luminosity Large Hadron Collider (HL-LHC) at CERN is expected to collide protons at a centre-of-mass energy of 14\\,TeV and to reach an unprecedented peak instantaneous luminosity of $5 \\times 10^{34}\\,{\\rm cm}^{-2} {\\rm s}^{-1}$ with an average number of pileup events of 140. This will allow the ATLAS and CMS experiments to collect integrated luminosities of up to $3000\\,{\\rm fb}^{-1}$ during the project lifetime. To cope with this extreme scenario the CMS detector will be substantially upgraded before starting the HL-LHC, a plan known as CMS Phase-2 Upgrade. In the upgrade the entire CMS silicon pixel detector will be replaced and the new detector will feature increased radiation hardness, higher granularity and capability to handle higher data rate and longer trigger latency. In this report the Phase-2 Upgrade of the CMS silicon pixel detector will be reviewed, focusing on the features of the detector layout and on the development of new pixel devices.

  3. Design of a new front-end electronics test-bench for the upgraded ATLAS detector's Tile Calorimeter

    International Nuclear Information System (INIS)

    Kureba, C O; Govender, M; Hofsajer, I; Ruan, X; Sandrock, C; Spoor, M

    2015-01-01

    The year 2022 has been scheduled to see an upgrade of the Large Hadron Collider (LHC), in order to increase its instantaneous luminosity. The High Luminosity LHC, also referred to as the upgrade Phase-II, means an inevitable complete re-design of the read-out electronics in the Tile Calorimeter (TileCal) of the A Toroidal LHC Apparatus (ATLAS) detector. Here, the new read-out architecture is expected to have the front-end electronics transmit fully digitized information of the detector to the back-end electronics system. Fully digitized signals will allow more sophisticated reconstruction algorithms which will contribute to the required improved triggers at high pile-up. In Phase II, the current Mobile Drawer Integrity ChecKing (MobiDICK) test-bench will be replaced by the next generation test-bench for the TileCal superdrawers, the new Prometeo (A Portable ReadOut ModulE for Tilecal ElectrOnics). Prometeo is a portable, high-throughput electronic system for full certification of the front-end electronics of the ATLAS TileCal. It is designed to interface to the fast links and perform a series of tests on the data to assess the certification of the electronics. The Prometeo's prototype is being assembled by the University of the Witwatersrand and installed at CERN for further developing, tuning and tests. This article describes the overall design of the new Prometeo, and how it fits into the TileCal electronics upgrade. (paper)

  4. South Ukraine NPP: Safety improvements through Plant Computer upgrade

    International Nuclear Information System (INIS)

    Brenman, O.; Chernyshov, M. A.; Denning, R. S.; Kolesov, S. A.; Balakan, H. H.; Bilyk, B. I.; Kuznetsov, V. I.; Trosman, G.

    2006-01-01

    This paper summarizes some results of the Plant Computer upgrade at the Units 2 and 3 of South Ukraine Nuclear Power Plant (NPP). A Plant Computer, which is also called the Computer Information System (CIS), is one of the key safety-related systems at VVER-1000 nuclear plants. The main function of the CIS is information support for the plant operators during normal and emergency operational modes. Before this upgrade, South Ukraine NPP operated out-of-date and obsolete systems. This upgrade project wax founded by the U.S. DOE in the framework of the International Nuclear Safety Program (INSP). The most efficient way to improve the quality and reliability of information provided to the plant operator is to upgrade the Human-System Interface (HSI), which is the Upper Level (UL) CIS. The upgrade of the CIS data-acquisition system (DAS), which is the Lower Level (LL) CIS, would have less effect on the unit safety. Generally speaking, the lifetime of the LL CIS is much higher than one of the UL CIS. Unlike Plant Computers at the Western-designed plants, the functionality of the WER-1000 CISs includes a control function (Centralized Protection Testing) and a number of the plant equipment monitoring functions, for example, Protection and Interlock Monitoring and Turbo-Generator Temperature Monitoring. The new system is consistent with a historical migration of the format by which information is presented to the operator away from the traditional graphic displays, for example, Piping and Instrument Diagrams (P and ID's), toward Integral Data displays. The cognitive approach to information presentation is currently limited by some licensing issues, but is adapted to a greater degree with each new system. The paper provides some lessons learned on the management of the international team. (authors)

  5. U.S.-Russia MPC and A upgrades at the Beloyarsk Nuclear Power Plant

    International Nuclear Information System (INIS)

    Saraev, O.; Haase, M.; Smarto, C.; Mikkelsen, K.; Heinberg, C.; Showalter, R.; Soo Hoo, M.; Hatcher, C.; Forehand, M.

    1998-01-01

    During the January 1996 meeting of the Gore-Chernomyrdin Commission, the Beloyarsk Nuclear Power Plant (BNPP) was identified as one of the additional sites for cooperative projects on upgrading Materials Protection, Control and Accounting (MPC and A). Since June 1996, Sandia National Laboratories (SNL), Pacific Northwest National Laboratories (PNNL), and Los Alamos National Laboratory (LANL) have worked with BNPP to upgrade MPC and A at the facility. Some unique challenges were encountered because BNPP has an operating BN-600 600-Megawatt breeder reactor. SNL has been responsible for working with BNPP to implement physical protection upgrades to the Central Alarm Station, Fresh Fuel Storage building, Spent Fuel Storage Area, and Vehicle/Personnel Portal. In addition, improved communication equipment for the Ministry of the Interior (MVD) guards and training of personnel were provided. PNNL has been responsible for coordinating Material Control and Accounting (MC and A) upgrades at BNPP. PNNL, in conjunction with LANL, has implemented such MC and A upgrades as a computerized nuclear materials accounting system, training in MC and A elements, nondestructive assay instrumentation for fresh fuel, installation of a fork detector for measuring spent fuel, and installation of an underwater video camera for verification of spent fuel serial numbers

  6. Seismic evaluation and upgrading design of overhead roads between reactor buildings of WWER-1000 MW type NPP

    International Nuclear Information System (INIS)

    Jordanov, M.J.; Stoyanov, G.S.; Geshanov, I.H.; Kirilov, K.P.; Schuetz, W.

    2003-01-01

    This paper presents results obtained during the study of overhead roads between Reactor Building (RB) of WWER-1000 MW NPP and possible measures for their seismic upgrade. The main objective of this project is to evaluate the behavior of overhead roads under site-specific seismic loading and to determine whether this structure satisfies current international safety regulations, followed by development of upgrading concepts. Overhead roads are pre-cast RC structure, which can be divided to separate substructures. They comprise of pedestrian gallery and pipeline box, connecting reactor buildings with auxiliary building. They are mounted at approximately 10 m above ground level. The overhead roads are evaluated for Review Level Earthquake (RLE) as seismic category II structures. As seismic input motion is RLE, free field response spectra anchored to 0.2 g PGA are used with 0.5 scaling factor. Soil-Structure Interaction effects are taken into account through equivalent soil springs with frequency adjusted stiffness. In order to meet the objective of the project a technical design specification is developed for conformance with International, US and Bulgarian standards and codes, taking into account site specific conditions. The general approach is consistent with up-to-date practice for evaluation and upgrade of nuclear power plant facilities. The separate steps comprising the overall fulfillment of project's major objectives may be summarized as follows: study of all available data for initial design and as built conditions, creation of 3-D detailed finite element models for as-built structure, determination of dynamic characteristics, evaluation of adequacy of initial design under new seismic loading (calculation of D/C ratios for structural members and connections, evaluation of embedment lengths for embedded parts and rebars, deformation evaluation, stability checks), development of upgrading concepts for enhancement, verification of capability of upgraded structure

  7. A feasibility study of projection-based energy weighting based on a photon-counting detector in contrast-enhanced digital subtraction mammography: a simulation study

    International Nuclear Information System (INIS)

    Choi, Sunghoon; Lee, Seungwan; Choi, Yuna; Kim, Heejoung

    2014-01-01

    Contrast media, such as iodine and gadolinium, are generally used in digital subtraction mammography to enhance the contrast between target and background materials. In digital subtraction mammography, where one image (with contrast medium) is subtracted from another (anatomical background) to facilitate visualization of the tumor structure, tumors can be more easily distinguished after the injection of a contrast medium. In order to have more an effective method to increase the contrast-to-noise ratio (CNR), we applied a projection-based energy-weighting method. The purpose of this study is to demonstrate the feasibility of using the projection-based energy-weighting method in digital subtraction mammography. Unlike some other previous studies, we applied the projection-based energy-weighting method to more practical mammography conditions by using the Monte Carlo method to simulate four different iodine solutions embedded in a breast phantom comprised of 50% adipose and 50% glandular tissues. We also considered an optimal tube voltage and anode/filter combination in digital iodine contrast media mammography in order to maximize the figure-of-merit (FOM). The simulated source energy was from 20 to 45 keV to prevent electronic noise and include the k-edge energy of iodine (33.2 keV). The results showed that the projection-based energy-weighting improved the CNR by factors of 1.05 - 1.86 compared to the conventionally integrated images. Consequently, the CNR of digital subtraction mammography images can be improved by using projection-based energy-weighting with photon-counting detectors.

  8. A feasibility study of projection-based energy weighting based on a photon-counting detector in contrast-enhanced digital subtraction mammography: a simulation study

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Sunghoon; Lee, Seungwan; Choi, Yuna; Kim, Heejoung [Yonsei University, Wonju (Korea, Republic of)

    2014-06-15

    Contrast media, such as iodine and gadolinium, are generally used in digital subtraction mammography to enhance the contrast between target and background materials. In digital subtraction mammography, where one image (with contrast medium) is subtracted from another (anatomical background) to facilitate visualization of the tumor structure, tumors can be more easily distinguished after the injection of a contrast medium. In order to have more an effective method to increase the contrast-to-noise ratio (CNR), we applied a projection-based energy-weighting method. The purpose of this study is to demonstrate the feasibility of using the projection-based energy-weighting method in digital subtraction mammography. Unlike some other previous studies, we applied the projection-based energy-weighting method to more practical mammography conditions by using the Monte Carlo method to simulate four different iodine solutions embedded in a breast phantom comprised of 50% adipose and 50% glandular tissues. We also considered an optimal tube voltage and anode/filter combination in digital iodine contrast media mammography in order to maximize the figure-of-merit (FOM). The simulated source energy was from 20 to 45 keV to prevent electronic noise and include the k-edge energy of iodine (33.2 keV). The results showed that the projection-based energy-weighting improved the CNR by factors of 1.05 - 1.86 compared to the conventionally integrated images. Consequently, the CNR of digital subtraction mammography images can be improved by using projection-based energy-weighting with photon-counting detectors.

  9. Performance of HT-WGS Catalysts for Upgrading of Syngas Obtained from Biomass Gasification

    Energy Technology Data Exchange (ETDEWEB)

    Marano Bujan, M.; Sanchez Hervas, J. M.

    2009-05-21

    Oxygen pressurized gasification of biomass out stands as a very promising approach to obtain energy or hydrogen from renewable sources. The technical feasibility of this technology is being investigated under the scope of the VI FP CHRISGAS project, which has started in September 2004 and has a duration of five years. The Division of Combustion and Gasification of CIEMAT participates in this project in Work Package 13: Ancillary and novel processes, studying innovative gas separation and gas upgrading systems. Such systems include novel or available high temperature water gas shift catalysts and commercially available membranes not yet tried in this type of atmosphere. This report describes the activities carried out during the period 2005-2007 regarding the performance of high temperature water gas shift catalysts for upgrading of synthesis gas obtained from biomass gasification. (Author) 28 refs.

  10. Overview of the Compact Muon Solenoid Phase 1 Forward Pixel Upgrade

    CERN Document Server

    Gonzalez, Irving

    2016-01-01

    During Run II of the LHC, the instantaneous luminosity will increase to near 2.5×1034cm−2 s −1 . This increase in luminosity will create a high-pileup environment with a large charged particle flux near the interaction point. Operating in such challenging conditions requires high-efficiency tracking and vertexing in order to maintain the physics performance of Run I. The Phase 1 Pixel Upgrade will meet these challenges by incorporating new digital readout chips and front-end electronics for higher data rates, DC-DC powering, and dual-phase CO2 cooling, which will achieve performance exceeding that of the present detector with a lower material budget. The upgraded detector will be installed during the extended technical stop between 2016 and 2017, and it will increase the number of barrel layers from 3 to 4 and the number of forward disks from 2 to 3. The design of the new forward detector will be presented along with status of system tests, module assembly, and module qualification.

  11. Soft ware upgrade for Mobile Laboratories in Estonia, Latvia and Lithuania

    DEFF Research Database (Denmark)

    Bargholz, Kim; Andersen, Frank

    1998-01-01

    In July-August 1998 the soft ware for controlling the measurements in the mobile laboratories have been upgraded. The mobile laboratories are sponsored by Danish east aid projects in cooperation with Rotaray Denmark.The equipment used is 4 L NaI(Tl) detectors mounted on the roof of the cars toget...

  12. Digitizing geographic data with GRIDOT; a generalized program for drawing overlay grids in various map projections

    International Nuclear Information System (INIS)

    Edwards, R.G.; Durfee, R.C.

    1976-09-01

    The GRIDOT computer program draws overlay grids on a Calcomp plotter for use in digitizing information from maps, rectified aerial photographs, and other sources of spatially distributed data related to regional environmental problems. The options of the program facilitate use of the overlays with standard maps and map projections of the continental United States. The overlay grid may be defined as a latitude-longitude grid (geodetic grid), a Universal Transverse Mercator Grid, or one of the standard state-plane coordinate system grids. The map for which the overlay is intended may be in an Albers Equal Area projection, a Lambert Conformal projection, a Polyconic projection, a Transverse Mercator projection, a Universal Transverse Mercator projection, or any of the standard state-plane projections

  13. I{sup Y}Q upgrading at a 1 bbl/d scale

    Energy Technology Data Exchange (ETDEWEB)

    Brown, W. [ETX Systems, Calgary, AB (Canada)

    2009-07-01

    The complex relationships between the many chemical and physical processes involved in heavy oil thermal upgrading have inhibited technology development in heavy oil because these underlying processes have been difficult to quantify. This paper presented a model which provides focus for the development of new upgrading technology. It is based on the understanding that product yields and qualities are influenced by the balance between mass transfer and reaction kinetics. ETX Systems developed the I{sup Y}Q upgrading technology which exceeds benchmarks in terms of liquid yields, product qualities and economics. The attributes of the technology result in a smaller environmental footprint associated with heavy oil development. A pilot plant has been built at a 1 bbl/day scale. The fluidized bed process complete with circulation of hot solids was commissioned in the fall of 2007. The unit has since provided field support for the original yield and quality claims assigned to the I{sup Y}Q upgrading technology. The results have exceeded original expectations. ETX Systems has also launched a project to prove commercial operability at a scale of 2000 bbl/day. This presentation focused on the challenges faced during the pilot exercise. The results have shown the advantage of lowering operating temperatures with respect to both yield and quality. tabs., figs.

  14. Electron-cloud simulation studies for the CERN-PS in the framework of the LHC Injectors Upgrade project

    CERN Document Server

    Rioja Fuentelsaz, Sergio

    The present study aims to provide a consistent picture of the electron cloud effect in the CERN Proton Synchrotron (PS) and to investigate possible future limitations due to the requirements foreseen by the LHC Injectors Upgrade (LIU) project. It consists of a complete simulation survey of the electron cloud build-up in the different beam pipe sections of the ring depending on several controllable beam parameters and vacuum chamber surface properties, covering present and future operation parameters. As the combined function magnets of the accelerator constitute almost the $80\\%$ in length of the ring, the implementation of a new feature for the simulation of any external magnetic field on the PyECLOUD code, made it possible to perform this study. All the results of the simulations are given as a function of the vacuum chamber surface properties in order to deduce them, both locally and globally, when compared with experimental data. In a first step, we characterize locally the maximum possible number of ...

  15. GENII: The Hanford Environmental Radiation Dosimetry Software System: Volume 2, Users' manual: Hanford Environmental Dosimetry Upgrade Project

    International Nuclear Information System (INIS)

    Napier, B.A.; Peloquin, R.A.; Strenge, D.L.; Ramsdell, J.V.

    1988-11-01

    The Hanford Environmental Dosimetry Upgrade Project was undertaken to incorporate the internal dosimetry models recommended by the International Commission on Radiological Protection (ICRP) in updated versions of the environmental pathway analysis models used at Hanford. The resulting second generation of Hanford environmental dosimetry computer codes is compiled in the Hanford Environmental Dosimetry System (Generation II, or GENII). The purpose of this coupled system of computer codes is to analyze environmental contamination of, air, water, or soil. This is accomplished by calculating radiation doses to individuals or populations. GENII is described in three volumes of documentation. This second volume is a Users' Manual, providing code structure, users' instructions, required system configurations, and QA-related topics. The first volume describes the theoretical considerations of the system. The third volume is a Code Maintenance Manual for the user who requires knowledge of code detail. It includes logic diagrams, global dictionary, worksheets, example hand calculations, and listings of the code and its associated data libraries. 27 refs., 17 figs., 23 tabs

  16. Injection septa position and angle optimisation in view of the 2 GeV liu upgrade of the CERN PS

    CERN Document Server

    Serluca, HM; Forte, V; Fraser, M; Sterbini, G

    2017-01-01

    In the framework of the LHC Injector Upgrade (LIU)project the CERN PS injection kinetic energy will be up-graded from 1.4 to 2 GeV. The injection equipment, whichis already operating close to its limit, is being redesigned tocope with 30% increase in the beam rigidity. In this paper wepresent the experimental results from Machine Development(MD) studies on the present septum to explore its operationalhardware limits with respect to aperture restrictions, beamlosses and kick strengths in view of the LIU upgrade

  17. Development of test platform for digital I and C system evaluation

    International Nuclear Information System (INIS)

    Kim, Young Mi; Kwon, Yong Il

    2012-01-01

    Nuclear I and C (Instrument and Control) systems which need safety critical function have adopted various control units and communication protocols. These trends have been enlarged new nuclear plants design and upgrading of operating plants. Applying to these digital technologies to nuclear power plants has many good advantages, such as upgrade of functionality and performance and improvement of efficiency and economics. But, it also has several flaws. System designs have been more complicated and software reliability analysis and risk analysis have been more difficult. Also, cyber security problems came to the fore as I and C systems are connected through networks. The vulnerabilities of computer systems are vital to nuclear safety. Coping with the new IT technology of new and operating power plants, it is necessary to analyze verification technology and obtain regulatory technology through establishment of test platform. This paper presents test platform for digital I and C system evaluation of NPP

  18. Development of test platform for digital I and C system evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Young Mi; Kwon, Yong Il [Korea Institute of Nuclear Safety, Daejeon (Korea, Republic of)

    2012-10-15

    Nuclear I and C (Instrument and Control) systems which need safety critical function have adopted various control units and communication protocols. These trends have been enlarged new nuclear plants design and upgrading of operating plants. Applying to these digital technologies to nuclear power plants has many good advantages, such as upgrade of functionality and performance and improvement of efficiency and economics. But, it also has several flaws. System designs have been more complicated and software reliability analysis and risk analysis have been more difficult. Also, cyber security problems came to the fore as I and C systems are connected through networks. The vulnerabilities of computer systems are vital to nuclear safety. Coping with the new IT technology of new and operating power plants, it is necessary to analyze verification technology and obtain regulatory technology through establishment of test platform. This paper presents test platform for digital I and C system evaluation of NPP.

  19. I and C upgrading at nuclear power plants

    International Nuclear Information System (INIS)

    Tamiri, A.

    2003-01-01

    Continuing the operation of existing nuclear power plants will help reduce the number of new base-load nuclear and fossil power plants that need to be built. Old nuclear power plants in Canada are operating with analog instrumentation and control systems. For a number of reasons, such as changes and improvements in the applicable standards and design, maintenance problems due to the lack of spares, technical obsolescence, the need to increase power production, availability, reliability and safety, and in order to reduce operation and maintenance costs, instrumentation and control upgrading at nuclear power plants in a cost effective manner should be considered the greatest priority. Failures of instrumentation and control (I and C) due to aging and obsolescence issues may have an immediate negative impact on plant reliability and availability and also affect long-term plant performance and safety. In today's competitive marketplace, power plants are under pressure to cut spending on maintenance while reducing the risk of equipment failure that could cause unplanned outage. To improve plant safety and availability, old nuclear power plants will require investment in new technologies that can improve the performance and reduce the costs of generation by addressing the long term reliability of systems by up-grading to modem digital instrumentation and control and optimization opportunities. Boiler drum level control at nuclear power plants is critical for both plant protection and equipment safety and applies equality to high and low levels of water within the boiler drum. Plant outage studies at Pickering Nuclear have identified boiler drum level control and feed water control systems as major contributors to plant unavailability. Ways to improve transient and steady state response, upgrading existing poor analog control systems for boiler level and feed-water control systems at Pickering Nuclear, with enhanced and robust controller will be discussed in this paper

  20. A New Readout Electronics for the LHCb Muon Detector Upgrade

    CERN Multimedia

    Cadeddu, Sandro

    2016-01-01

    The 2018/2019 upgrade of LHCb Muon System foresees a 40 MHz readout scheme and requires the development of a new Off Detector Electronics (nODE) board that will be based on the nSYNC, a radiation tolerant custom ASIC developed in UMC 130 nm technology. Each nODE board has 192 input channels processed by 4 nSYNCs. The nSYNC is equipped with fully digital TDCs and it implements all the required functionalities for the readout: bunch crossing alignment, data zero suppression, time measurements. Optical interfaces, based on GBT and Versatile link components, are used to communicate with DAQ, TFC and ECS systems.

  1. Digital control computer upgrade at the Cernavoda NPP simulator

    International Nuclear Information System (INIS)

    Ionescu, T.

    2006-01-01

    The Plant Process Computer equips some Nuclear Power Plants, like CANDU-600, with Centralized Control performed by an assembly of two computers known as Digital Control Computers (DCC) and working in parallel for safely driving of the plan at steady state and during normal maneuvers but also during abnormal transients when the plant is automatically steered to a safe state. The Centralized Control means both hardware and software with obligatory presence in the frame of the Full Scope Simulator and subject to changing its configuration with specific requirements during the plant and simulator life and covered by this subsection

  2. Digital TMI

    Science.gov (United States)

    Rios, Joseph

    2012-01-01

    Presenting the current status of the Digital TMI project to visiting members of the FAA Command Center. Digital TMI is an effort to store national-level traffic management initiatives in a standards-compliant manner. Work is funded by the FAA.

  3. The ALICE Inner Tracking System Upgrade

    CERN Document Server

    Siddhanta, Sabyasachi

    2015-01-01

    The long term plan of ALICE (A Large Ion Collider Experiment) at the CERN Large Hadron Collider (LHC) is a detailed investigation and characterisation of the Quark-Gluon Plasma (QGP). ALICE has devised a comprehensive upgrade strategy to enhance its physics capabilities and to exploit the LHC running conditions after the second long shutdown of the LHC scheduled in 2019-20. The upgraded ALICE will focus on high precision measurements of rare probes over a wide range of momenta, which will significantly improve the performance with respect to the present experimental set up. The upgrade strategy is based on the fact that after LS2 LHC will progressively increase its luminosity with Pb beams eventually reaching an interaction rate of about 50 kHz. To exploit the new LHC capabilities, several existing detectors will undergo a substantial upgrade and new detectors will be added. Within this upgrade strategy, the Inner Tracking System (ITS) upgrade forms an important cornerstone, providing precise measurements for...

  4. Green technologies for the environmental upgrading of infrastructures

    Directory of Open Access Journals (Sweden)

    Alessandra Battisti

    2013-05-01

    Full Text Available Over the last few decades, the globalization phenomenon has determined the exponential development - from an economic, cultural and political standpoint - of traffic flows, the number of means and infrastructures involved in communication and exchange. At the same time, these represent one of the most complicated environmental issues of contemporary times, but perhaps also one of the most outstanding opportunities for setting up processes aimed at upgrading the territory and its constructions, towards environmental regeneration and social reorganization. These, in turn, would produce and spread (as in some already established examples of infrastructure upgrading innovative and more sustainable forms of urban lifestyles. The present contribution aims at illustrating the former, beginning with research and experiments involving the development of eco-friendly meta-design models for the correct employment of “green technologies” in: meta-project research for small mobility facilities; expansion and redevelopment works for the Stazione Termini; experiments in design for some energy-efficient underground metro stops in Rome.

  5. Maintenance procedure upgrade programs

    International Nuclear Information System (INIS)

    Campbell, J.J.; Zimmerman, C.M.

    1988-01-01

    This paper describes a systematic approach to upgrading nuclear power plant maintenance procedures. The approach consists of four phases: diagnosis, program planning, program implementation, and program evaluation. Each phase is explained as a series of steps to ensure that all factors in a procedure upgrade program are considered

  6. The STAR beam energy scan phase II physics and upgrades

    Czech Academy of Sciences Publication Activity Database

    Yang, C.; Adamczyk, L.; Adkins, J. K.; Agakishiev, G.; Bielčík, J.; Bielčíková, Jana; Chaloupka, P.; Federič, Pavol; Rusňák, Jan; Rusňáková, O.; Šimko, Miroslav; Šumbera, Michal; Vértési, Robert

    2017-01-01

    Roč. 967, č. 11 (2017), s. 800-803 ISSN 0375-9474 R&D Projects: GA MŠk LG15001; GA MŠk LM2015054 Institutional support: RVO:61389005 Keywords : STAR collaboration * BES-II * detector upgrade * QCD phase diagram * physics oppotrunity Subject RIV: BG - Nuclear, Atomic and Molecular Physics, Colliders OBOR OECD: Nuclear physics Impact factor: 1.916, year: 2016

  7. ATLAS Detector Upgrade Prospects

    International Nuclear Information System (INIS)

    Dobre, M

    2017-01-01

    After the successful operation at the centre-of-mass energies of 7 and 8 TeV in 2010-2012, the LHC was ramped up and successfully took data at the centre-of-mass energies of 13 TeV in 2015 and 2016. Meanwhile, plans are actively advancing for a series of upgrades of the accelerator, culminating roughly ten years from now in the high-luminosity LHC (HL-LHC) project, which will deliver of the order of five times the LHC nominal instantaneous luminosity along with luminosity levelling. The ultimate goal is to extend the dataset from about few hundred fb −1 expected for LHC running by the end of 2018 to 3000 fb −1 by around 2035 for ATLAS and CMS. The challenge of coping with the HL-LHC instantaneous and integrated luminosity, along with the associated radiation levels, requires further major changes to the ATLAS detector. The designs are developing rapidly for a new all-silicon tracker, significant upgrades of the calorimeter and muon systems, as well as improved triggers and data acquisition. ATLAS is also examining potential benefits of extensions to larger pseudorapidity, particularly in tracking and muon systems. This report summarizes various improvements to the ATLAS detector required to cope with the anticipated evolution of the LHC luminosity during this decade and the next. A brief overview is also given on physics prospects with a pp centre-of-mass energy of 14 TeV. (paper)

  8. Technical study of real-time simulation system for digital I and C system of steam generator in nuclear power plant

    International Nuclear Information System (INIS)

    Shi Ji; Jiang Mingyu; Ma Yunqin

    2004-01-01

    The real-time simulation system, which forms a interactive closed circle together with the steam generator control system, has been developed using a dynamic mathematical model of steam generator in this paper. It can provide a simulation target for upgrades of digital Instrument and Control system in Nuclear Power Plant (NPP) and is applicable for further research of control schemes. With this program, the authors have studied and analyzed the response of transient parameters to some different disturbance, the calculated results are in good agreement with those calculated by NPP simulator program. This will give a theoretical analysis for upgrades of digital I and C system in nuclear power plant

  9. Software upgrade for the DIII-D neutral beam control systems

    International Nuclear Information System (INIS)

    Cummings, J.W.; Thurgood, P.A.

    1992-01-01

    This paper reports on the Neutral Beam Software Upgrade project which was launched in early 1990. The major goals were to upgrade the MAC IV operating system to the latest revision (K.1), use standard MODCOMP software (as much as possible), and to develop a very user friendly, versatile system. Accomplishing these goals required new software to be developed and modifications to existing applications software to make it compatible with the latest operating system. The custom operating system modules to handle the message service and interrupt handling were replaced by the standard MODCOMP Inter Task Communication (ITC) and interrupt routines that are part of the MAX IV operating system. The message service provides the mechanism for doing shot task sequencing (task scheduling). The interrupt routines are used to connect external irterrupts to the system

  10. Project GRACE A grid based search tool for the global digital library

    CERN Document Server

    Scholze, Frank; Vigen, Jens; Prazak, Petra; The Seventh International Conference on Electronic Theses and Dissertations

    2004-01-01

    The paper will report on the progress of an ongoing EU project called GRACE - Grid Search and Categorization Engine (http://www.grace-ist.org). The project participants are CERN, Sheffield Hallam University, Stockholm University, Stuttgart University, GL 2006 and Telecom Italia. The project started in 2002 and will finish in 2005, resulting in a Grid based search engine that will search across a variety of content sources including a number of electronic thesis and dissertation repositories. The Open Archives Initiative (OAI) is expanding and is clearly an interesting movement for a community advocating open access to ETD. However, the OAI approach alone may not be sufficiently scalable to achieve a truly global ETD Digital Library. Many universities simply offer their collections to the world via their local web services without being part of any federated system for archiving and even those dissertations that are provided with OAI compliant metadata will not necessarily be picked up by a centralized OAI Ser...

  11. 7 CFR 1709.109 - Eligible projects.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Eligible projects. 1709.109 Section 1709.109... projects. Eligible projects are those that acquire, construct, extend, repair, upgrade or otherwise improve... are eligible. Projects providing or improving service to communities with extremely high energy costs...

  12. Towards a resilience management framework for complex enterprise systems upgrade implementation

    Science.gov (United States)

    Teoh, Say Yen; Yeoh, William; Zadeh, Hossein Seif

    2017-05-01

    The lack of knowledge of how resilience management supports enterprise system (ES) projects accounts for the failure of firms to leverage their investments in costly ES implementations. Using a structured-pragmatic-situational (SPS) case study research approach, this paper reports on an investigation into the resilience management of a large utility company as it implemented an ES upgrade. Drawing on the literature and on the case study findings, we developed a process-based resilience management framework that involves three strategies (developing situation awareness, demystifying threats, and executing restoration plans) and four organisational capabilities that transform resilience management concepts into practices. We identified the crucial phases of ES upgrade implementation and developed indicators for how different strategies and capabilities of resilience management can assist managers at different stages of an ES upgrade. This research advances the state of existing knowledge by providing specific and verifiable propositions for attaining a state of resilience, the knowledge being grounded in the empirical reality of a case study. Moreover, the framework offers ES practitioners a roadmap to better identify appropriate responses and levels of preparedness.

  13. Experience with the upgraded VERONA-u WWER-440 core monitoring system

    International Nuclear Information System (INIS)

    Lux, I.; Vegh, J.; Adorjan, F.; Buerger, L.

    1994-01-01

    The paper describes the components, functioning and services of the VERONA-u core monitoring system recently installed at Unit 2 and 3 of the Hungarian Paks NPP. The VERONA-u is a totally upgraded and modernized version of the previous VERONA system, in the upgrading project the data-concentrator, the host computer and the operators' displays were replaced by state-of-the-art hardware and software components. Dual hardware redundancy and automatic function recovery actions were introduced in order to ensure high system availability. The man-machine interface has been redesigned completely, applying X Windows as Graphical User Interface. Improved core analysis and power reconstruction methods were introduced, together with a detailed hot-spot monitoring algorithm. A capable archivation module ensures periodic logging of all measured data, change sensitive storage of important signal changes and provides sophisticated post-mortem analysis tools. The upgraded system has been working satisfactorily on Unit 2 for a complete fuel cycle by now, the on-line system response in complex, transient situations is illustrated in the paper. (author). 10 refs, 4 figs

  14. X-ray optics simulation and beamline design for the APS upgrade

    Science.gov (United States)

    Shi, Xianbo; Reininger, Ruben; Harder, Ross; Haeffner, Dean

    2017-08-01

    The upgrade of the Advanced Photon Source (APS) to a Multi-Bend Achromat (MBA) will increase the brightness of the APS by between two and three orders of magnitude. The APS upgrade (APS-U) project includes a list of feature beamlines that will take full advantage of the new machine. Many of the existing beamlines will be also upgraded to profit from this significant machine enhancement. Optics simulations are essential in the design and optimization of these new and existing beamlines. In this contribution, the simulation tools used and developed at APS, ranging from analytical to numerical methods, are summarized. Three general optical layouts are compared in terms of their coherence control and focusing capabilities. The concept of zoom optics, where two sets of focusing elements (e.g., CRLs and KB mirrors) are used to provide variable beam sizes at a fixed focal plane, is optimized analytically. The effects of figure errors on the vertical spot size and on the local coherence along the vertical direction of the optimized design are investigated.

  15. Organization of project works in Industry 4.0 digital item designing companies

    Science.gov (United States)

    Gurjanov, A. V.; Zakoldaev, D. A.; Shukalov, A. V.; Zharinov, I. O.

    2018-05-01

    The task of the project works organization in the Industry 4.0 item designing digital factories is being studied. There is a scheme of the item designing component life cycle. There is also a scheme how to develop and confirm the quality of the item designing component documentation using the mathematical modelling. There is a description of the self-organization principles for the cyber and physical technological equipment in the Industry 4.0 «smart factory» company during the manufacturing process.

  16. Upgrading Preschool Environment in a Swedish Municipality: Evaluation of an Implementation Process.

    Science.gov (United States)

    Altin, Carolina; Kvist Lindholm, Sofia; Wejdmark, Mats; Lättman-Masch, Robert; Boldemann, Cecilia

    2015-07-01

    Redesigning outdoor preschool environment may favorably affect multiple factors relevant to health and reach many children. Cross-sectional studies in various landscapes at different latitudes have explored the characteristics of preschool outdoor environment considering the play potential triggering combined physical activity and sun-protective behavior due to space, vegetation, and topography. Criteria were pinpointed to upgrade preschool outdoor environment for multiple health outcomes to be applied in local government in charge of public preschools. Purposeful land use policies and administrative management of outdoor land use may serve to monitor the quality of preschool outdoor environments (upgrading and planning). This study evaluates the process of implementing routines for upgrading outdoor preschool environments in a medium-sized municipality, Sweden, 2008-2011, using qualitative and quantitative analysis. Recorded written material (logs and protocols) related to the project was processed using thematic analysis. Quantitative data (m(2) flat/multileveled, overgrown/naked surface, and fraction of free visible sky) were analyzed to assess the impact of implementation (surface, topography, greenery integrated in play). The preschool outdoor environments were upgraded accordingly. The quality of implementation was assessed using the theory of policy streams approach. Though long-term impact remains to be confirmed the process seems to have changed work routines in the interior management for purposeful upgrading of preschool outdoor environments. The aptitude and applicability of inexpensive methods for assessing, selecting, and upgrading preschool land at various latitudes, climates, and outdoor play policies (including gender aspects and staff policies) should be further discussed, as well as the compilation of data for monitoring and evaluation. © 2015 Society for Public Health Education.

  17. BELIEF Project: the Portal and the Digital Library

    International Nuclear Information System (INIS)

    Zoppi, F.; Calabro, G.

    2007-01-01

    BELIEF (Bringing Europes eLectronic Infrastructures to Expanding Frontiers) Project aim to create a platform where eInfrastructures providers and users can collaborate and exchange knowledge, which will help ensure that eInfrastructures are developed and used effectively worldwide, filling the gap separating the Research Infrastructure providers from the users, and thus contribute to the emergence of a competitive knowledge-based economy. To create this synergy of multi-disciplinary Research Infrastructure communities, BELIEF created a one-stop-shop for eInfrastructures communities providing online a Digital Library (DL) and a Portal with a search and contact facility, case studies, a discussion forum, eInfrastructures publications. Offline, it has organised events including brainstorming, networking workshops and international conferences and publications, since BELIEFs values are firmly rooted in international cooperation to the emerging economies, particularly of Latin America and India. The Portal and the DL are key parts of this project. There was an opportunity to provide a ready and common source of information on eInfrastructures, both for the users wanting to find out the supply, and for the providers wanting to extend user base and develop their systems. The Portal and the DL respond to this demand by supplying to researchers documentation that matches their search criteria precisely, according to their interest and professional profile. (Author)

  18. Digital delicacies

    OpenAIRE

    Holley, Rose

    2001-01-01

    This presentation outlines the purpose and work of the newly appointed Digital Projects Librarian at the University of Auckland. It gives a brief overview of what digitisation is, the benefits, the stages of a digitisation project and also samples of interesting international digitisation projects and new University of Auckland Library Digitisation projects.

  19. We Need to Build AN Upgraded, Digital Democracy

    Science.gov (United States)

    Helbing, Dirk

    With all the big data available, would it be possible to build a crystal ball allowing us to see everything that is going on in the world in real time? Such projects are in fact under way, built by the military and research centers around the world. These are also political projects, because knowledge is power. Will so much data enable the ruling of a wise king or a benevolent dictator? Could society even be run like a giant machine? Indeed, there are companies that work on such concepts, for example, Google and IBM. They aim at building an operating system for our society that would try to steer our decision-making and behavior with personalized information...

  20. The Level-1 Tile-Muon Trigger in the Tile Calorimeter upgrade program

    International Nuclear Information System (INIS)

    Ryzhov, A.

    2016-01-01

    The Tile Calorimeter (TileCal) is the central hadronic calorimeter of the ATLAS experiment at the Large Hadron Collider (LHC). TileCal provides highly-segmented energy measurements for incident particles. Information from TileCal's outermost radial layer can assist in muon tagging in the Level-1 Muon Trigger by rejecting fake muon triggers due to slow charged particles (typically protons) without degrading the efficiency of the trigger. The main activity of the Tile-Muon Trigger in the ATLAS Phase-0 upgrade program was to install and to activate the TileCal signal processor module for providing trigger inputs to the Level-1 Muon Trigger. This report describes the Tile-Muon Trigger, focusing on the new detector electronics such as the Tile Muon Digitizer Board (TMDB) that receives, digitizes and then provides the signal from eight TileCal modules to three Level-1 muon endcap Sector-Logic Boards.