WorldWideScience

Sample records for development plan high

  1. High-Speed Sealift Technology Development Plan

    National Research Council Canada - National Science Library

    2002-01-01

    .... The purpose of the project was to define the technology investments required to enable development of the high-speed commercial and military ships needed to provide realistic future mission capabilities...

  2. Advanced High-Level Waste Glass Research and Development Plan

    Energy Technology Data Exchange (ETDEWEB)

    Peeler, David K. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Vienna, John D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Schweiger, Michael J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Fox, Kevin M. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2015-07-01

    The U.S. Department of Energy Office of River Protection (ORP) has implemented an integrated program to increase the loading of Hanford tank wastes in glass while meeting melter lifetime expectancies and process, regulatory, and product quality requirements. The integrated ORP program is focused on providing a technical, science-based foundation from which key decisions can be made regarding the successful operation of the Hanford Tank Waste Treatment and Immobilization Plant (WTP) facilities. The fundamental data stemming from this program will support development of advanced glass formulations, key process control models, and tactical processing strategies to ensure safe and successful operations for both the low-activity waste (LAW) and high-level waste (HLW) vitrification facilities with an appreciation toward reducing overall mission life. The purpose of this advanced HLW glass research and development plan is to identify the near-, mid-, and longer-term research and development activities required to develop and validate advanced HLW glasses and their associated models to support facility operations at WTP, including both direct feed and full pretreatment flowsheets. This plan also integrates technical support of facility operations and waste qualification activities to show the interdependence of these activities with the advanced waste glass (AWG) program to support the full WTP mission. Figure ES-1 shows these key ORP programmatic activities and their interfaces with both WTP facility operations and qualification needs. The plan is a living document that will be updated to reflect key advancements and mission strategy changes. The research outlined here is motivated by the potential for substantial economic benefits (e.g., significant increases in waste throughput and reductions in glass volumes) that will be realized when advancements in glass formulation continue and models supporting facility operations are implemented. Developing and applying advanced

  3. Development plan. High activity-long living wastes project. Abstract

    International Nuclear Information System (INIS)

    2007-01-01

    This brochure presents the actions that the ANDRA (the French national agency of radioactive wastes) has to implement in the framework of the project of high activity-long living (HALL) radioactive wastes (HAVL project) conformably to the requirements of the program defined in the law from June 28, 2006 (law no 2006-739). This law precises the three, complementary, research paths to explore for the management of this type of wastes: separation and transmutation of long-living radioactive elements, reversible disposal in deep geologic underground, and long duration storage. The ANDRA's action concerns the geologic disposal aspect. The following points are presented: the HALL wastes and their containers, the reversible disposal procedure, the HAVL project: financing of researches, storage concepts, development plan of the project (dynamics, information and dialogue approach, input data, main steps, schedule); the nine programs of the HAVL project (laboratory experiments and demonstration tests, surface survey, scientific program, simulation program, surface engineering studies and technological tests, information and communication program, program of environment and facilities surface observation and monitoring, waste packages management, monitoring and transport program, disposal program); the five transverse technical and scientific activities (safety, reversibility, cost, health and occupational safety, impact study). (J.S.)

  4. Guide for Developing High-Quality School Emergency Operations Plans

    Science.gov (United States)

    Office of Safe and Healthy Students, US Department of Education, 2013

    2013-01-01

    Each school day, our nation's schools are entrusted to provide a safe and healthy learning environment for approximately 55 million elementary and secondary school students in public and nonpublic schools. In collaboration with their local government and community partners, schools can take steps to plan for these potential emergencies through the…

  5. Development plan. High activity-long living wastes project. Abstract; Plan de developpement. Projet HAVL. Resume

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-07-01

    This brochure presents the actions that the ANDRA (the French national agency of radioactive wastes) has to implement in the framework of the project of high activity-long living (HALL) radioactive wastes (HAVL project) conformably to the requirements of the program defined in the law from June 28, 2006 (law no 2006-739). This law precises the three, complementary, research paths to explore for the management of this type of wastes: separation and transmutation of long-living radioactive elements, reversible disposal in deep geologic underground, and long duration storage. The ANDRA's action concerns the geologic disposal aspect. The following points are presented: the HALL wastes and their containers, the reversible disposal procedure, the HAVL project: financing of researches, storage concepts, development plan of the project (dynamics, information and dialogue approach, input data, main steps, schedule); the nine programs of the HAVL project (laboratory experiments and demonstration tests, surface survey, scientific program, simulation program, surface engineering studies and technological tests, information and communication program, program of environment and facilities surface observation and monitoring, waste packages management, monitoring and transport program, disposal program); the five transverse technical and scientific activities (safety, reversibility, cost, health and occupational safety, impact study). (J.S.)

  6. High Burnup Dry Storage Cask Research and Development Project, Final Test Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2014-02-27

    EPRI is leading a project team to develop and implement the first five years of a Test Plan to collect data from a SNF dry storage system containing high burnup fuel.12 The Test Plan defined in this document outlines the data to be collected, and the storage system design, procedures, and licensing necessary to implement the Test Plan.13 The main goals of the proposed test are to provide confirmatory data14 for models, future SNF dry storage cask design, and to support license renewals and new licenses for ISFSIs. To provide data that is most relevant to high burnup fuel in dry storage, the design of the test storage system must mimic real conditions that high burnup SNF experiences during all stages of dry storage: loading, cask drying, inert gas backfilling, and transfer to the ISFSI for multi-year storage.15 Along with other optional modeling, SETs, and SSTs, the data collected in this Test Plan can be used to evaluate the integrity of dry storage systems and the high burnup fuel contained therein over many decades. It should be noted that the Test Plan described in this document discusses essential activities that go beyond the first five years of Test Plan implementation.16 The first five years of the Test Plan include activities up through loading the cask, initiating the data collection, and beginning the long-term storage period at the ISFSI. The Test Plan encompasses the overall project that includes activities that may not be completed until 15 or more years from now, including continued data collection, shipment of the Research Project Cask to a Fuel Examination Facility, opening the cask at the Fuel Examination Facility, and examining the high burnup fuel after the initial storage period.

  7. Workshop: Research and development plans for high power spallation neutron testing at BNL

    International Nuclear Information System (INIS)

    1996-01-01

    This report consists of vugraphs from presentations at the meeting. The papers covered the following topics: (1) APS as a proton source; (2) target status for NSNS (National Spallation Neutron Source); (3) spallation neutron source in Japan; (4) liquid LiBi flow loop; and (5) research and development plans for high power tests at the AGS

  8. Hanford Site Development Plan

    Energy Technology Data Exchange (ETDEWEB)

    Rinne, C.A.; Curry, R.H.; Hagan, J.W.; Seiler, S.W.; Sommer, D.J. (Westinghouse Hanford Co., Richland, WA (USA)); Yancey, E.F. (Pacific Northwest Lab., Richland, WA (USA))

    1990-01-01

    The Hanford Site Development Plan (Site Development Plan) is intended to guide the short- and long-range development and use of the Hanford Site. All acquisition, development, and permanent facility use at the Hanford Site will conform to the approved plan. The Site Development Plan also serves as the base document for all subsequent studies that involve use of facilities at the Site. This revision is an update of a previous plan. The executive summary presents the highlights of the five major topics covered in the Site Development Plan: general site information, existing conditions, planning analysis, Master Plan, and Five-Year Plan. 56 refs., 67 figs., 31 tabs.

  9. Hanford Site Development Plan

    International Nuclear Information System (INIS)

    Rinne, C.A.; Curry, R.H.; Hagan, J.W.; Seiler, S.W.; Sommer, D.J.; Yancey, E.F.

    1990-01-01

    The Hanford Site Development Plan (Site Development Plan) is intended to guide the short- and long-range development and use of the Hanford Site. All acquisition, development, and permanent facility use at the Hanford Site will conform to the approved plan. The Site Development Plan also serves as the base document for all subsequent studies that involve use of facilities at the Site. This revision is an update of a previous plan. The executive summary presents the highlights of the five major topics covered in the Site Development Plan: general site information, existing conditions, planning analysis, Master Plan, and Five-Year Plan. 56 refs., 67 figs., 31 tabs

  10. Development plan of basic technology for a high intensity proton linear accelerator

    International Nuclear Information System (INIS)

    Mizumoto, M.

    1990-01-01

    The national program called OMEGA (Option Making Extra Gains from Actinide and Fission Products) has started with the aim of promoting the research and development of the new technologies for nuclear waste partitioning and transmutation. As a part of this program, Japan Atomic Energy Research Institute, JAERI, has laid out several R and D plans for accelerator based actinide transmutation. The present article first outlines the status of the high intensity proton linear accelerator. Then it describes the time schedule for the development of a high intensity proton linac, focusing on the first step development (basic technology accelerator), second step development (engineering test accelerator, and third step development (commercial plant). It also outlines the conceptual design study and preliminary design calculations for basic technology accelerator, focusing on general consideration, ion source, radio frequency quadrupole, drift tube linac, and high beta linac. (N.K.)

  11. Community development planning

    International Nuclear Information System (INIS)

    Gray, S.I.

    1983-01-01

    The focus of this paper will be methods of local community involvement in the community development planning efforts which will be required at the recommended sites. Community development planning will include capital improvement plans, housing plans, zoning changes, business development plans and other community service and fiscal plans required to meet the projected needs of new residents as a result of the repository construction and operation. This paper will present, (1) the need for community planning, (2) methods of responding to community planning needs, (3) current community planning issues to be addressed. 2 references, 1 figure

  12. Strategy Planning of Technology Development for High Speed Railways : Electrical Parts

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Y. J.; Kim, K. H.; Rim, G. H.; Ha, H. D.; Park, K. Y.; Lee, J. D.; Kang, D. H. [Korea Electrotechnology Research Institute (Korea, Republic of)

    1996-11-01

    At the beginning of 1996, Government has set up the Technology Development Program for High Speed Railways as a national project. Accordingly, the detailed action planning has been established with the collaboration works between Ministry of Construction and Transport and Ministry of Commerce and Trade. On the other hand, the current technology status of domestic manufacturer and many related organizations in Korea only reveals the lack of capabilities in producing the high speed trains. Without the technology transfer programs from the advanced foreign manufacturer (GEC-Alsthom), the domestic manufacturers could not produce HSR. Korea Electrotechnology Research Institute has steered the study to integrate the domestic engineering and technology units specialized in the diversified areas by formulating the feasible collaboration structure between KERI and many organizations on the technology basis. The long term action planning both with the strategic guide and on the technology basis shall be the key function to upgrade the current technology status feasibly for development of the advanced high speed train of 350 km/h. (author). refs., figs., tabs.

  13. Research and development plans for disposal of high-level and transuranic wastes

    International Nuclear Information System (INIS)

    Bartlett, J.W.; Platt, A.M.

    1978-09-01

    This plan recommends a 20-year, 206 million (1975 $'s) R and D program on geologic structures in the contiguous U.S. and on the midplate Pacific seabed with the objective of developing an acceptable method for disposal of commercial high-level and transuranic wastes by 1997. No differentiation between high-level and transuranic waste disposal is made in the first 5 years of the program. A unique application of probability theory to R and D planning establishes, at a 95% confidence level, that the program objective will be met if at least fifteen generic options and five specific disposal sites are explored in detail and at least two pilot plants are constructed and operated. A parallel effort on analysis and evaluation maximizes information available for decisions on the acceptability of the disposal techniques. Based on considerations of technical feasibility, timing and technical risk, the other disposal concepts, e.g., ice sheets, partitioning, transmutation and space disposal cited in BNWL-1900 are not recommended for near future R and D

  14. Hanford Site Development Plan

    International Nuclear Information System (INIS)

    Hathaway, H.B.; Daly, K.S.; Rinne, C.A.; Seiler, S.W.

    1993-05-01

    The Hanford Site Development Plan (HSDP) provides an overview of land use, infrastructure, and facility requirements to support US Department of Energy (DOE) programs at the Hanford Site. The HSDP's primary purpose is to inform senior managers and interested parties of development activities and issues that require a commitment of resources to support the Hanford Site. The HSDP provides an existing and future land use plan for the Hanford Site. The HSDP is updated annually in accordance with DOE Order 4320.1B, Site Development Planning, to reflect the mission and overall site development process. Further details about Hanford Site development are defined in individual area development plans

  15. EMI Registry Development Plan

    CERN Document Server

    Memon, S.; Szigeti, G.; Field, L.

    2012-01-01

    This documents describes the overall development plan of the EMI Registry product, the plan focuses on the realisation of the EMI Registry specification as defined in the document. It is understood that during the course of the development phase the specification will likely evolve and the changes will be fed into the specification document.

  16. Development of a High Resolution 3D Infant Stomach Model for Surgical Planning

    Science.gov (United States)

    Chaudry, Qaiser; Raza, S. Hussain; Lee, Jeonggyu; Xu, Yan; Wulkan, Mark; Wang, May D.

    Medical surgical procedures have not changed much during the past century due to the lack of accurate low-cost workbench for testing any new improvement. The increasingly cheaper and powerful computer technologies have made computer-based surgery planning and training feasible. In our work, we have developed an accurate 3D stomach model, which aims to improve the surgical procedure that treats the infant pediatric and neonatal gastro-esophageal reflux disease (GERD). We generate the 3-D infant stomach model based on in vivo computer tomography (CT) scans of an infant. CT is a widely used clinical imaging modality that is cheap, but with low spatial resolution. To improve the model accuracy, we use the high resolution Visible Human Project (VHP) in model building. Next, we add soft muscle material properties to make the 3D model deformable. Then we use virtual reality techniques such as haptic devices to make the 3D stomach model deform upon touching force. This accurate 3D stomach model provides a workbench for testing new GERD treatment surgical procedures. It has the potential to reduce or eliminate the extensive cost associated with animal testing when improving any surgical procedure, and ultimately, to reduce the risk associated with infant GERD surgery.

  17. The development and verification of a highly accurate collision prediction model for automated noncoplanar plan delivery

    International Nuclear Information System (INIS)

    Yu, Victoria Y.; Tran, Angelia; Nguyen, Dan; Cao, Minsong; Ruan, Dan; Low, Daniel A.; Sheng, Ke

    2015-01-01

    Purpose: Significant dosimetric benefits had been previously demonstrated in highly noncoplanar treatment plans. In this study, the authors developed and verified an individualized collision model for the purpose of delivering highly noncoplanar radiotherapy and tested the feasibility of total delivery automation with Varian TrueBeam developer mode. Methods: A hand-held 3D scanner was used to capture the surfaces of an anthropomorphic phantom and a human subject, which were positioned with a computer-aided design model of a TrueBeam machine to create a detailed virtual geometrical collision model. The collision model included gantry, collimator, and couch motion degrees of freedom. The accuracy of the 3D scanner was validated by scanning a rigid cubical phantom with known dimensions. The collision model was then validated by generating 300 linear accelerator orientations corresponding to 300 gantry-to-couch and gantry-to-phantom distances, and comparing the corresponding distance measurements to their corresponding models. The linear accelerator orientations reflected uniformly sampled noncoplanar beam angles to the head, lung, and prostate. The distance discrepancies between measurements on the physical and virtual systems were used to estimate treatment-site-specific safety buffer distances with 0.1%, 0.01%, and 0.001% probability of collision between the gantry and couch or phantom. Plans containing 20 noncoplanar beams to the brain, lung, and prostate optimized via an in-house noncoplanar radiotherapy platform were converted into XML script for automated delivery and the entire delivery was recorded and timed to demonstrate the feasibility of automated delivery. Results: The 3D scanner measured the dimension of the 14 cm cubic phantom within 0.5 mm. The maximal absolute discrepancy between machine and model measurements for gantry-to-couch and gantry-to-phantom was 0.95 and 2.97 cm, respectively. The reduced accuracy of gantry-to-phantom measurements was

  18. The development and verification of a highly accurate collision prediction model for automated noncoplanar plan delivery

    Energy Technology Data Exchange (ETDEWEB)

    Yu, Victoria Y.; Tran, Angelia; Nguyen, Dan; Cao, Minsong; Ruan, Dan; Low, Daniel A.; Sheng, Ke, E-mail: ksheng@mednet.ucla.edu [Department of Radiation Oncology, David Geffen School of Medicine, University of California Los Angeles, Los Angeles, California 90024 (United States)

    2015-11-15

    Purpose: Significant dosimetric benefits had been previously demonstrated in highly noncoplanar treatment plans. In this study, the authors developed and verified an individualized collision model for the purpose of delivering highly noncoplanar radiotherapy and tested the feasibility of total delivery automation with Varian TrueBeam developer mode. Methods: A hand-held 3D scanner was used to capture the surfaces of an anthropomorphic phantom and a human subject, which were positioned with a computer-aided design model of a TrueBeam machine to create a detailed virtual geometrical collision model. The collision model included gantry, collimator, and couch motion degrees of freedom. The accuracy of the 3D scanner was validated by scanning a rigid cubical phantom with known dimensions. The collision model was then validated by generating 300 linear accelerator orientations corresponding to 300 gantry-to-couch and gantry-to-phantom distances, and comparing the corresponding distance measurements to their corresponding models. The linear accelerator orientations reflected uniformly sampled noncoplanar beam angles to the head, lung, and prostate. The distance discrepancies between measurements on the physical and virtual systems were used to estimate treatment-site-specific safety buffer distances with 0.1%, 0.01%, and 0.001% probability of collision between the gantry and couch or phantom. Plans containing 20 noncoplanar beams to the brain, lung, and prostate optimized via an in-house noncoplanar radiotherapy platform were converted into XML script for automated delivery and the entire delivery was recorded and timed to demonstrate the feasibility of automated delivery. Results: The 3D scanner measured the dimension of the 14 cm cubic phantom within 0.5 mm. The maximal absolute discrepancy between machine and model measurements for gantry-to-couch and gantry-to-phantom was 0.95 and 2.97 cm, respectively. The reduced accuracy of gantry-to-phantom measurements was

  19. The development and verification of a highly accurate collision prediction model for automated noncoplanar plan delivery.

    Science.gov (United States)

    Yu, Victoria Y; Tran, Angelia; Nguyen, Dan; Cao, Minsong; Ruan, Dan; Low, Daniel A; Sheng, Ke

    2015-11-01

    Significant dosimetric benefits had been previously demonstrated in highly noncoplanar treatment plans. In this study, the authors developed and verified an individualized collision model for the purpose of delivering highly noncoplanar radiotherapy and tested the feasibility of total delivery automation with Varian TrueBeam developer mode. A hand-held 3D scanner was used to capture the surfaces of an anthropomorphic phantom and a human subject, which were positioned with a computer-aided design model of a TrueBeam machine to create a detailed virtual geometrical collision model. The collision model included gantry, collimator, and couch motion degrees of freedom. The accuracy of the 3D scanner was validated by scanning a rigid cubical phantom with known dimensions. The collision model was then validated by generating 300 linear accelerator orientations corresponding to 300 gantry-to-couch and gantry-to-phantom distances, and comparing the corresponding distance measurements to their corresponding models. The linear accelerator orientations reflected uniformly sampled noncoplanar beam angles to the head, lung, and prostate. The distance discrepancies between measurements on the physical and virtual systems were used to estimate treatment-site-specific safety buffer distances with 0.1%, 0.01%, and 0.001% probability of collision between the gantry and couch or phantom. Plans containing 20 noncoplanar beams to the brain, lung, and prostate optimized via an in-house noncoplanar radiotherapy platform were converted into XML script for automated delivery and the entire delivery was recorded and timed to demonstrate the feasibility of automated delivery. The 3D scanner measured the dimension of the 14 cm cubic phantom within 0.5 mm. The maximal absolute discrepancy between machine and model measurements for gantry-to-couch and gantry-to-phantom was 0.95 and 2.97 cm, respectively. The reduced accuracy of gantry-to-phantom measurements was attributed to phantom setup

  20. Hanford Site Development Plan

    International Nuclear Information System (INIS)

    Hathaway, H.B.; Daly, K.S.; Rinne, C.A.; Seiler, S.W.

    1992-05-01

    The Hanford Site Development Plan (HSDP) provides an overview of land use, infrastructure, and facility requirements to support US Department of Energy (DOE) programs at the Hanford Site. The HSDP's primary purpose is to inform senior managers and interested parties of development activities and issues that require a commitment of resources to support the Hanford Site. The HSDP provides a land use plan for the Hanford Site and presents a picture of what is currently known and anticipated in accordance with DOE Order 4320.1B. Site Development Planning. The HSDP wig be updated annually as future decisions further shape the mission and overall site development process. Further details about Hanford Site development are defined in individual area development plans

  1. Development of computerized dose planning system and applicator for high dose rate remote afterloading irradiation

    Energy Technology Data Exchange (ETDEWEB)

    Choi, T. J. [Keimyung Univ., Taegu (Korea); Kim, S. W. [Fatima Hospital, Taegu (Korea); Kim, O. B.; Lee, H. J.; Won, C. H. [Keimyung Univ., Taegu (Korea); Yoon, S. M. [Dong-a Univ., Pusan (Korea)

    2000-04-01

    To design and fabricate of the high dose rate source and applicators which are tandem, ovoids and colpostat for OB/Gyn brachytherapy includes the computerized dose planning system. Designed the high dose rate Ir-192 source with nuclide atomic power irradiation and investigated the dose characteristics of fabricated brachysource. We performed the effect of self-absorption and determining the gamma constant and output factor and determined the apparent activity of designed source. he automated computer planning system provided the 2D distribution and 3D includes analysis programs. Created the high dose rate source Ir-192, 10 Ci(370GBq). The effective attenuation factor from the self-absorption and source wall was examined to 0.55 of the activity of bare source and this factor is useful for determination of the apparent activity and gamma constant 4.69 Rcm{sup 2}/mCi-hr. Fabricated the colpostat was investigated the dose distributions of frontal, axial and sagittal plane in intra-cavitary radiation therapy for cervical cancer. The reduce dose at bladder and rectum area was found about 20 % of original dose. The computerized brachytherapy planning system provides the 2-dimensional isodose and 3-D include the dose-volume histogram(DVH) with graphic-user-interface mode. emoted afterloading device was built for experiment of created Ir-192 source with film dosimetry within {+-}1 mm discrepancy. 34 refs., 25 figs., 11 tabs. (Author)

  2. WE-AB-209-05: Development of an Ultra-Fast High Quality Whole Breast Radiotherapy Treatment Planning System

    International Nuclear Information System (INIS)

    Sheng, Y; Li, T; Yoo, S; Yin, F; Blitzblau, R; Horton, J; Palta, M; Hahn, C; Wu, Q; Ge, Y

    2016-01-01

    Purpose: To enable near-real-time (<20sec) and interactive planning without compromising quality for whole breast RT treatment planning using tangential fields. Methods: Whole breast RT plans from 20 patients treated with single energy (SE, 6MV, 10 patients) or mixed energy (ME, 6/15MV, 10 patients) were randomly selected for model training. Additional 20 cases were used as validation cohort. The planning process for a new case consists of three fully automated steps:1. Energy Selection. A classification model automatically selects energy level. To build the energy selection model, principle component analysis (PCA) was applied to the digital reconstructed radiographs (DRRs) of training cases to extract anatomy-energy relationship.2. Fluence Estimation. Once energy is selected, a random forest (RF) model generates the initial fluence. This model summarizes the relationship between patient anatomy’s shape based features and the output fluence. 3. Fluence Fine-tuning. This step balances the overall dose contribution throughout the whole breast tissue by automatically selecting reference points and applying centrality correction. Fine-tuning works at beamlet-level until the dose distribution meets clinical objectives. Prior to finalization, physicians can also make patient-specific trade-offs between target coverage and high-dose volumes.The proposed method was validated by comparing auto-plans with manually generated clinical-plans using Wilcoxon Signed-Rank test. Results: In 19/20 cases the model suggested the same energy combination as clinical-plans. The target volume coverage V100% was 78.1±4.7% for auto-plans, and 79.3±4.8% for clinical-plans (p=0.12). Volumes receiving 105% Rx were 69.2±78.0cc for auto-plans compared to 83.9±87.2cc for clinical-plans (p=0.13). The mean V10Gy, V20Gy of the ipsilateral lung was 24.4±6.7%, 18.6±6.0% for auto plans and 24.6±6.7%, 18.9±6.1% for clinical-plans (p=0.04, <0.001). Total computational time for auto-plans was

  3. WE-AB-209-05: Development of an Ultra-Fast High Quality Whole Breast Radiotherapy Treatment Planning System

    Energy Technology Data Exchange (ETDEWEB)

    Sheng, Y [Duke University, Durham, NC (United States); Li, T [Thomas Jefferson University, Philadelphia, PA (United States); Yoo, S; Yin, F; Blitzblau, R; Horton, J; Palta, M; Hahn, C; Wu, Q [Duke University Medical Center, Durham, NC (United States); Ge, Y [University of North Carolina at Charlotte, Charlotte, NC (United States)

    2016-06-15

    Purpose: To enable near-real-time (<20sec) and interactive planning without compromising quality for whole breast RT treatment planning using tangential fields. Methods: Whole breast RT plans from 20 patients treated with single energy (SE, 6MV, 10 patients) or mixed energy (ME, 6/15MV, 10 patients) were randomly selected for model training. Additional 20 cases were used as validation cohort. The planning process for a new case consists of three fully automated steps:1. Energy Selection. A classification model automatically selects energy level. To build the energy selection model, principle component analysis (PCA) was applied to the digital reconstructed radiographs (DRRs) of training cases to extract anatomy-energy relationship.2. Fluence Estimation. Once energy is selected, a random forest (RF) model generates the initial fluence. This model summarizes the relationship between patient anatomy’s shape based features and the output fluence. 3. Fluence Fine-tuning. This step balances the overall dose contribution throughout the whole breast tissue by automatically selecting reference points and applying centrality correction. Fine-tuning works at beamlet-level until the dose distribution meets clinical objectives. Prior to finalization, physicians can also make patient-specific trade-offs between target coverage and high-dose volumes.The proposed method was validated by comparing auto-plans with manually generated clinical-plans using Wilcoxon Signed-Rank test. Results: In 19/20 cases the model suggested the same energy combination as clinical-plans. The target volume coverage V100% was 78.1±4.7% for auto-plans, and 79.3±4.8% for clinical-plans (p=0.12). Volumes receiving 105% Rx were 69.2±78.0cc for auto-plans compared to 83.9±87.2cc for clinical-plans (p=0.13). The mean V10Gy, V20Gy of the ipsilateral lung was 24.4±6.7%, 18.6±6.0% for auto plans and 24.6±6.7%, 18.9±6.1% for clinical-plans (p=0.04, <0.001). Total computational time for auto-plans was

  4. Engineering task plan for the development of a high pressure water drill system for BY-105 saltwell screen installation

    International Nuclear Information System (INIS)

    RITTER, G.A.

    1999-01-01

    This engineering task plan identifies the activities required for developing an ultra high pressure water drill system for installation of a saltwell screen in Tank BY-105. A water drill system is needed to bore through the hard waste material in this tank because of the addition of Portland cement in the 1960s and/or 1970s. The activities identified in this plan include the design, procurement, and qualification testing of the water drill along with readiness preparations including developing operating procedures, training Operations personnel, and conducting an assessment of readiness

  5. Children's high-level writing skills: development of planning and revising and their contribution to writing quality.

    Science.gov (United States)

    Limpo, Teresa; Alves, Rui A; Fidalgo, Raquel

    2014-06-01

    It is well established that the activity of producing a text is a complex one involving three main cognitive processes: Planning, translating, and revising. Although these processes are crucial in skilled writing, beginning and developing writers seem to struggle with them, mainly with planning and revising. To trace the development of the high-level writing processes of planning and revising, from Grades 4 to 9, and to examine whether these skills predict writing quality in younger and older students (Grades 4-6 vs. 7-9), after controlling for gender, school achievement, age, handwriting fluency, spelling, and text structure. Participants were 381 students from Grades 4 to 9 (age 9-15). Students were asked to plan and write a story and to revise another story by detecting and correcting mechanical and substantive errors. From Grades 4 to 9, we found a growing trend in students' ability to plan and revise despite the observed decreases and stationary periods from Grades 4 to 5 and 6 to 7. Moreover, whereas younger students' planning and revising skills made no contribution to the quality of their writing, in older students, these high-level skills contributed to writing quality above and beyond control predictors. The findings of this study seem to indicate that besides the increase in planning and revising, these skills are not fully operational in school-age children. Indeed, given the contribution of these high-level skills to older students' writing, supplementary instruction and practice should be provided from early on. © 2013 The British Psychological Society.

  6. Status report of a high luminosity muon collider and future research and development plans

    International Nuclear Information System (INIS)

    Palmer, R.B.; Tollestrup, A.; Sessler, A.

    1996-11-01

    Muon Colliders have unique technical and physics advantages and disadvantages when compared with both hadron and electron machines. They should thus be regarded as complementary. Parameters are given of 4 TeV and 0.5 TeV (c-of-m) high luminosity μ + μ - colliders, and of a 0.5 TeV lower luminosity demonstration machine. We discuss the various systems in such muon colliders, starting from the proton accelerator needed to generate the muons and proceeding through muon cooling, acceleration and storage in a collider ring. Detector background, polarization, and nonstandard operating conditions are analyzed. Finally, we present an R ampersand D plan to determine whether such machines are practical, and, if they are, lead to the construction of a 0.5 TeV demonstration by 2010, and to a 4 TeV collider by the year 2020

  7. Environment: Development plan 1993

    International Nuclear Information System (INIS)

    1992-01-01

    The concept of sustainable development is gradually being incorporated into the activities of Hydro-Quebec as part of that utility's environmental policy. In its proposed development plan, Hydro-Quebec's principal strategic environmental orientations comprise making environmental concerns an integral part of the planning process, managing impacts associated with the construction of generating and transmission facilities, and evaluating the utility's environmental performance. The approaches used, tools to be developed, and information required in each of these orientations are described. Issues considered include the strategic choices available for meeting electricity requirements, including renewable energy sources; the evaluation of environmental externalities; the use of environmental impact assessment studies and environmental monitoring; relationships with native peoples and mitigation of the social impacts of northern hydroelectric development; protection and management of natural and human habitats; the utility's contribution to regional development; management of wastes and rights-of-way; and environmental auditing. 1 tab

  8. TVET Planning and Development

    NARCIS (Netherlands)

    Dr. J. Onstenk

    2014-01-01

    There are changes in society and labour market demands made to TVET and in the TVET system itself. To deal with both types of challenges, the aim for TVET planning and development is to anticipate how employment will evolve and to determine how to give individuals a knowledge base that will enable

  9. Using a High-Performance Planning Model to Increase Levels of Functional Effectiveness Within Professional Development.

    Science.gov (United States)

    Winter, Peggi

    2016-01-01

    Nursing professional practice models continue to shape how we practice nursing by putting families and members at the heart of everything we do. Faced with enormous challenges around healthcare reform, models create frameworks for practice by unifying, uniting, and guiding our nurses. The Kaiser Permanente Practice model was developed to ensure consistency for nursing practice across the continuum. Four key pillars support this practice model and the work of nursing: quality and safety, leadership, professional development, and research/evidence-based practice. These four pillars form the foundation that makes transformational practice possible and aligns nursing with Kaiser Permanente's mission. The purpose of this article is to discuss the pillar of professional development and the components of the Nursing Professional Development: Scope and Standards of Practice model (American Nurses Association & National Nursing Staff Development Organization, 2010) and place them in a five-level development framework. This process allowed us to identify the current organizational level of practice, prioritize each nursing professional development component, and design an operational strategy to move nursing professional development toward a level of high performance. This process is suggested for nursing professional development specialists.

  10. Developing plan and pre-conceptual design of target system for JAERI`s high intensity neutron source

    Energy Technology Data Exchange (ETDEWEB)

    Hino, Ryutaro; Kaminaga, Masanori; Haga, Katsuhiro; Ishikura, Syuichi [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment; Nakamura, Fumito; Uchida, Shoji

    1997-11-01

    This paper presents an outline of developing plan of a target system and topics obtained by a pre-conceptual design, which aims to establish a technology base of the target system and to make clear a system concept. In the plan, two types of target - solid and mercury targets - are to be developed for a neutron scattering facility. Information obtained through the development shall be applied to designs of an irradiation and a transmutation facilities. Through the pre-conceptual design, system arrangement, scale etc. were made clear: total weight will be 12000 ton, and 26 beam lines with beam shutters will be equipped for 4 moderators. Engineering problems were also made clear through the design; high flux heat removal, dynamic stress caused by thermal shock and pressure wave, loop technology for the mercury target and a slurry moderator consisting of methane pellets and liquefied hydrogen. We are now constructing new test apparatuses and arranging computer codes for solving these problems. (author)

  11. MHTGR [Modular High-Temperature Gas-Cooled Reactor] technology development plan

    International Nuclear Information System (INIS)

    Homan, F.J.; Neylan, A.J.

    1988-01-01

    This paper presents the approach used to define the technology program needed to support design and licensing of a Modular High-Temperature Gas-Cooled Reactor (MHTGR). The MHTGR design depends heavily on data and information developed during the past 25 years to support large HTGR (LHTGR) designs. The technology program focuses on MHTGR-specific operating and accident conditions, and on validation of models and assumptions developed using LHTGR data. The technology program is briefly outlined, and a schedule is presented for completion of technology work which is consistent with completion of a Final Safety Summary Analysis Report (FSSAR) by 1992

  12. Neutral beam development plan

    International Nuclear Information System (INIS)

    Staten, H.S.

    1980-08-01

    The national plan is presented for developing advanced injection systems for use on upgrades of existing experiments, and use on future facilities such as ETF, to be built in the late 1980's or early 90's where power production from magnetic fusion will move closer to a reality. Not only must higher power and longer pulse length systems be developed , but they must operate reliably; they must be a tool for the experimenter, not the experiment itself. Neutral beam systems handle large amounts of energy and as such, they often are as complicated as the plasma physics experiment itself. This presents a significant challenge to the neutral beam developer

  13. Development concept plan

    International Nuclear Information System (INIS)

    1992-06-01

    The following management objectives for New River Gorge National River relate to the Kaymoor site to: Preserve coal mining, railroad, and other historic resources that best illustrate park significance; Develop a system of land- and water-based recreation opportunities that allow visitors to experience the park's resources to the extent that natural, cultural, and scenic values are not imparied; and Work with the community to the extent possible to help it maximize economic benefits related to park development without impairing key resources. The Development Concept Plant outlining a plan of development for Kaymoor is a part of a larger emphasis by the National Park Service to identify and develop significant coal-related historic and cultural resources in southern West Virginia in cooperation with the West Virginia State Historic Preservation Office

  14. Hanford 300 Area Development Plan

    International Nuclear Information System (INIS)

    Daly, K.S.; Seiler, S.W.; Hail, J.C.

    1991-09-01

    The purpose of the Hanford 300 Area Development Plan (Development Plan) is to guide the physical development of the 300 Area in accordance with US Department of Energy (DOE) Order 4320.1B (DOE 1991b) by performing the following: (1) Establishing a land use plan, setting land use categories that meet the needs of existing and proposed activities; (2) Coordinating existing, 5-yr, and long-range development plans and guiding growth in accordance with those plans; (3) Establishing development guidelines to encourage cost-effective development and minimize conflicts between adjacent activities; (4) Identifying site development issues that need further analysis; Integrating program plans with development plans to ensure a logical progression of development; and, (6) Integrating DOE plans with local agency plans (i.e., city, country, state, and Tri-Cities Science and Technology Park plans)

  15. Guide for Developing High-Quality Emergency Operations Plans for Institutions of Higher Education

    Science.gov (United States)

    Office of Safe and Healthy Students, US Department of Education, 2013

    2013-01-01

    Our nation's postsecondary institutions are entrusted to provide a safe and healthy learning environment for students, faculty, and staff who live, work, and study on campus. Many of these emergencies occur with little to no warning; therefore, it is critical for institutions of higher education (IHEs) to plan ahead to help ensure the safety and…

  16. Gas development plan - Lithuania

    International Nuclear Information System (INIS)

    1993-10-01

    A detailed description of the plan for the development of gas utilization in Lithuania is presented. The plan is subdivided under the headings of gas supply, gas demand, gas transmission and distribution, economy and the organization of the gas sector in the country. The first phase of the project has been undertaken by a Danish firm in cooperation with the Lithuanian firm Lietuvos Dujos. The first aim was to clarify the problems that will arise in connection with this joint venture on developing the use of gas in Lithuania, focusing on existing gas supply and market conditions, the current flow control and metering and economic constraints. The organization of the gas sector in the country as it stands today is described and possible models for its future organization are discussed in addition to a strategy of implementation. Possible development trends are outlined and maximum/minimum demand scenarios are suggested. Subjects and areas related to the gas sector in Lithuania are identified for further investigation in the next phase. It is stated that Lithuania is at present undergoing a fast transformation towards a market economy and that the transfer of foreign currency has been liberalized. Only the pipeline from Minsk to Vilnius is open at present and provides the total supply of natural gas to Lithuania and Kalingrad, controlled by the Russian gas company, Lentransgas, on the basis of a gas purchase agreement regulated on a yearly basis. Other possible supply sources are the Danish part of the North Sea and the Norwegian offshore fields. (AB)

  17. Planning Model of Physics Learning In Senior High School To Develop Problem Solving Creativity Based On National Standard Of Education

    Science.gov (United States)

    Putra, A.; Masril, M.; Yurnetti, Y.

    2018-04-01

    One of the causes of low achievement of student’s competence in physics learning in high school is the process which they have not been able to develop student’s creativity in problem solving. This is shown that the teacher’s learning plan is not accordance with the National Eduction Standard. This study aims to produce a reconstruction model of physics learning that fullfil the competency standards, content standards, and assessment standards in accordance with applicable curriculum standards. The development process follows: Needs analysis, product design, product development, implementation, and product evaluation. The research process involves 2 peers judgment, 4 experts judgment and two study groups of high school students in Padang. The data obtained, in the form of qualitative and quantitative data that collected through documentation, observation, questionnaires, and tests. The result of this research up to the product development stage that obtained the physics learning plan model that meets the validity of the content and the validity of the construction in terms of the fulfillment of Basic Competence, Content Standards, Process Standards and Assessment Standards.

  18. Gas development plan - Estonia

    International Nuclear Information System (INIS)

    1994-06-01

    The total supply of natural gas to Estonia is provided by the Russian company ''Lentransgas'', a 10 year contract is under negotiation. The gas transmission system is physically a part of the transmission network in the Baltic region which previously operated as an integral part of the USSR gas transmission system. The potential market is too small to justify investment in an alternative pipeline from the North Sea. The general reduction in purchasing power in the former COMECON countries has resulted in a decreased industrial production in Estonia and lead to a steep decline in natural gas consumption in all sectors except households. The Danish firm ''Dansk Olie og Naturgas A/S'' has been requested to assist the Estonian company ''AS Eesti Gaas J.S.C.'' in preparing a gas development plan for Estonia. Phase 1 of this plan aims to provide a detailed description of the status of the existing situation under the headings of gas supply and demand, transmission and distribution, economy and organization. The most important problems related to the current transition of the Estonian gas sector towards operation under market conditions are addressed, focussing on gas supply and market conditions, flow control and metering. The general organization of the gas sector in Estonia is described and possible models for future organization are discussed. Some recommendations are given and areas in need of further investigation are identified. (AB)

  19. Network development plan 1995

    International Nuclear Information System (INIS)

    Anon.

    1995-11-01

    Network plan 1995 concerns several strategic problems, among others environmental policy of power transmission lines. Possibilities of restructuring aerial cable network are described. The state of the existing systems and plans for new network systems are presented. (EG)

  20. Developing nursing care plans.

    Science.gov (United States)

    Ballantyne, Helen

    2016-02-24

    This article aims to enhance nurses' understanding of nursing care plans, reflecting on the past, present and future use of care planning. This involves consideration of the central theories of nursing and discussion of nursing models and the nursing process. An explanation is provided of how theories of nursing may be applied to care planning, in combination with clinical assessment tools, to ensure that care plans are context specific and patient centred.

  1. Development and planning of plant for the high-pressure extraction of natural products

    Energy Technology Data Exchange (ETDEWEB)

    Eggers, R; Tschiersch, R [Thyssen Industrie A.G., Witten (Germany, F.R.)

    1978-11-01

    Important criteria in the designing of plant for the recovery of carrier or extract are reviewed, especially for the extraction of natural products with supercritical CO/sub 2/. The quantities to be determined in the planning of a large-scale plant are outlined and a typical process, the extraction of spices, is discussed in detail. The plant components and assemblies are presented together with their particular process engineering and construction characteristics. Finally, the thermodynamic aspects are dealt with in more detail and ways of optimizing a large-scale plant and reducing the power consumption are outlined. Particular attention is paid to the question of optimization regarding the most economic method of operation of such a plant in the future.

  2. Nuclear Regulatory Commission staff development of the license application review plan for a high-level radioactive waste repository

    International Nuclear Information System (INIS)

    Johnson, R.L.; Holonich, J.J.; Lee, M.P.; Delligatti, M.S.

    1993-01-01

    The Nuclear Regulatory Commission staff has recently started a new initiative to develop the License Application Review Plan (LARP) which the staff will use in its reviews of the U.S. Department of Energy's (DOE's) license application (LA) for a geologic repository for the disposal of high-level radioactive waste (HLW). This paper describes the staff's approach for developing the LARP, the development schedule and current status, the organization and content of the LARP, and the staff's LA review strategy. Therefore, it gives a preview of the draft LARP which will be made available in late 1993. It also describes how the LARP will be used as guidance to the staff in conducting reviews of regulatory and technical issues important to the licensing of a geologic repository. Finally, the benefits to the NRC staff, DOE, and other parties are discussed

  3. Development Plans and Life Plans: Knowledge Sharing?

    Directory of Open Access Journals (Sweden)

    Juan José Vieco Albarracín

    2010-02-01

    Full Text Available This article explores the possibilities of establishing knowledge sharing between governmental development plans and the “life plans” (planes de vida made by indigenous organizations, in particular the life plan of the Asociación de Autoridades Indígenas del Resguardo Tikuna, Cocama, Yagua (Aticoya, municipality of Puerto Nariño, Amazonas, Colombia. Colombia’s Constitution of 1991 created the ETI (Entidad Territorial Indígena,“indigenous territorial entity” as a territorial unit, just like municipalities, departments, and districts. This means that indigenous reservations (or “reserves” or “preserves” and associations should manage public funds, for which they must design a life plan. This inclusion and recognition of indigenous peoples entails that those life plans should articulate with the municipal, departmental, and national development plans. The article illustrates this situation by comparing two welfare programs –Resa (Red de Seguridad Alimentaria “Food Security Network” and Familias Guardabosques (“Forest Ranger Families”– and two income-generating productive and service (tourism projects carried out by Aticoya and the local indigenous councils of communities on the Amazon and Loretoyacu Rivers.

  4. The ‘Development Plan of National Strategic Emerging Industries Promotes Breakthrough Development of High-end Equipment and New Material Industry

    Institute of Scientific and Technical Information of China (English)

    2017-01-01

    The State Council recently printed and distributed the Notice on the‘Development Plan of National Strategic Emerging Industries for the'Thirteenth Five Year Plan'’(The Plan),which made overall deployment and arrangement for development target,key tasks,

  5. Development plan for renewable energies with a high environmental quality 2008-2012-2020

    International Nuclear Information System (INIS)

    2009-01-01

    Starting with the objectives defined by the Grenelle de l'Environnement in terms of percentage of renewable energies in the final energy consumption (20 - 25 percent), the authors indicate the present situation and objectives to be met by 2020 for the different sources of production of heat, of electricity and of biofuels, while mentioning the main obstacles to be overcome. They also define intermediate objectives to be met in 2012, and then examine the implications and need in terms of institutional organization and of action of local communities. They also propose objectives for each sector concerned by the production and consumption of renewable heat (housing, office building, and industry), renewable electricity (wind energy, photovoltaic energy, hydro-energy, use of biomass and wastes) and biofuels. They discuss the particular case of overseas territories, outline the industrial challenges for different energy production sectors (wind, solar, wood, biofuels), and give an insight on research and development perspectives for the different energy production technologies

  6. Momentum: "Developing Masterful Marketing Plans."

    Science.gov (United States)

    Meservey, Lynne D.

    1988-01-01

    Describes how directors can plan and develop a written marketing plan which can increase enrollment at child care centers. Components of successful marketing plans include parent retention; program merchandising; staff and director training; sales promotions; networking; and enrichment programs/fundraising. (NH)

  7. Hanford 200 Areas Development Plan

    Energy Technology Data Exchange (ETDEWEB)

    Rinne, C.A.; Daly, K.S.

    1993-08-01

    The purpose of the Hanford 200 Areas Development Plan (Development Plan) is to guide the physical development of the 200 Areas (which refers to the 200 East Area, 200 West Area, and 200 Area Corridor, located between the 200 East and 200 West Areas) in accordance with US Department of Energy (DOE) Order 4320.lB (DOE 1991a) by performing the following: Establishing a land-use plan and setting land-use categories that meet the needs of existing and proposed activities. Coordinating existing, 5-year, and long-range development plans and guiding growth in accordance with those plans. Establishing development guidelines to encourage cost-effective development and minimize conflicts between adjacent activities. Identifying site development issues that need further analysis. Integrating program plans with development plans to ensure a logical progression of development. Coordinate DOE plans with other agencies [(i.e., Washington State Department of Ecology (Ecology) and US Environmental Protection Agency (EPA)]. Being a support document to the Hanford Site Development Plan (DOE-RL 1990a) (parent document) and providing technical site information relative to the 200 Areas.

  8. Hanford 200 Areas Development Plan

    International Nuclear Information System (INIS)

    Rinne, C.A.; Daly, K.S.

    1993-08-01

    The purpose of the Hanford 200 Areas Development Plan (Development Plan) is to guide the physical development of the 200 Areas (which refers to the 200 East Area, 200 West Area, and 200 Area Corridor, located between the 200 East and 200 West Areas) in accordance with US Department of Energy (DOE) Order 4320.lB (DOE 1991a) by performing the following: Establishing a land-use plan and setting land-use categories that meet the needs of existing and proposed activities. Coordinating existing, 5-year, and long-range development plans and guiding growth in accordance with those plans. Establishing development guidelines to encourage cost-effective development and minimize conflicts between adjacent activities. Identifying site development issues that need further analysis. Integrating program plans with development plans to ensure a logical progression of development. Coordinate DOE plans with other agencies [(i.e., Washington State Department of Ecology (Ecology) and US Environmental Protection Agency (EPA)]. Being a support document to the Hanford Site Development Plan (DOE-RL 1990a) (parent document) and providing technical site information relative to the 200 Areas

  9. Development of retrievability plans

    International Nuclear Information System (INIS)

    Richardson, P.J.

    1999-03-01

    It has become clear, from monitoring of many national programmes for siting of final repositories for radioactive waste disposal, that the potential or otherwise for retrievability of emplaced wastes is the one issue in particular which is repeatedly raised during public consultation and interaction. Although even those repositories which may be constructed over the next decades will operate for many decades more and be sealed only after a long-term monitoring phase, there is little operational pressure to finalise retrievability concepts. However, as siting processes require detailed conceptual designs to be developed, as do the associated safety assessment exercises, it is becoming increasingly recognised that the potential for retrieval must be examined now. This report is the culmination of a short project carried out for the Swedish National Co-ordinator for Nuclear Waste Disposal to examine the situation as regards the development and possible implementation of retrievability as an integral part of a disposal concept for nuclear waste. Because of the short work period involved, it can at best be only an overview, designed to provide a broad picture of current plans. The Swedish Nuclear Power Inspectorate has begun to examine the issue, and a report is due later in 1999. A major collaborative investigation, which began in March 1998, is also currently underway under the auspices of the EU, but only involves implementing agencies from the various Member States. This report is intended to serve as background to these other studies when they appear. Utilising currently available information, as well as personal contacts, those countries currently examining retrievability or reversibility of disposal in some form have been identified. Information regarding these proposals has been collated, and contact made with relevant agencies and national regulatory bodies where possible. The report includes some review of the technical aspects of retrievability, with especial

  10. Wanted: A World Development Plan

    NARCIS (Netherlands)

    J. Tinbergen (Jan)

    1968-01-01

    textabstractDevelopment planning has become a routine activity for large numbers of corporations as well as for public authorities at various levels, particularly national governments. In quite a few national planning agencies extensive analyses of the probable expansion of world supply and demand

  11. Environmental development plan: magnetic fusion

    International Nuclear Information System (INIS)

    1979-09-01

    This Environmental Development Plan (EDP) identifies the planning and management requirements and schedules needed to evaluate and assess the environmental, health and safety (EH and S) aspects of the Magnetic Fusion Energy Program (MFE). Environment is defined to include the environmental, health (occupational and public), and safety aspects

  12. Low Impact Development Master Plan

    Energy Technology Data Exchange (ETDEWEB)

    Loftin, Samuel R. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-10-02

    This project creates a Low Impact Development (LID) Master Plan to guide and prioritize future development of LID projects at Los Alamos National Laboratory (LANL or the Laboratory). The LID Master Plan applies to developed areas across the Laboratory and focuses on identifying opportunities for storm water quality and hydrological improvements in the heavily urbanized areas of Technical Areas 03, 35 and 53. The LID Master Plan is organized to allow the addition of LID projects for other technical areas as time and funds allow in the future.

  13. Large shaft development test plan

    International Nuclear Information System (INIS)

    Krug, A.D.

    1984-03-01

    This test plan proposes the conduct of shaft liner tests as part of the large shaft development test proposed for the Hanford Site in support of the repository development program. The objectives of these tests are to develop techniques for measuring liner alignment (straightness), both construction assembly alignment and downhole cumulative alignment, and to assess the alignment information as a real time feedback to aid the installation procedure. The test plan is based upon installing a 16 foot ID shaft liner into a 20 foot diameter shaft to a depth of 1000 feet. This test plan is considered to be preliminary in that it was prepared as input for the decision to determine if development testing is required in this area. Should the decision be made to proceed with development testing, this test plan shall be updated and revised. 6 refs., 2 figs

  14. LDUA engineering development plan

    International Nuclear Information System (INIS)

    Engstrom, J.W.

    1994-01-01

    This document provides guidance to perform Light Duty Utility Arm (LDUA) development work and documentation required to validate the design of the LDUA System.The LDUA system will be used to deploy various types of sensors and devices to demonstrate the technology and qualify the integrated systems for operational use in the Hanford single shell tanks to characterize the waste inside and assess tank integrity

  15. Environmental Development Plan: uranium enrichment

    International Nuclear Information System (INIS)

    1979-09-01

    This Environmental Development Plan identifies and examines the environmental, health, safety, and socioeconomic concerns and corresponding requirements associated with the DOE research, development, demonstration, and operation of the Uranium Enrichment program, including the gaseous diffusion process, the centrifuge process, centrifuge rotor fabrication, and related research and development activities

  16. Large shaft development test plan

    International Nuclear Information System (INIS)

    Krug, A.D.

    1984-03-01

    This test plan proposes the conduct of a large shaft development test at the Hanford site in support of the repository development program. The purpose and objective of the test plan is to obtain the information necessary to establish feasibility and to predict the performance of the drilling system used to drill large diameter shafts. The test plan is based upon drilling a 20 ft diameter shaft to a depth of 1,000 feet. The test plan specifies series of tests to evaluate the performance of the downhole assembly, the performance of the rig, and the ability of the system to cope with geologic hazards. The quality of the hole produced will also be determined. This test plan is considered to be preliminary in that it was prepared as input for the decision to determine if development testing is required in this area. Should the decision be made to proceed with development testing, this test plan shall be updated and revised. 6 refs., 2 figs., 3 tabs

  17. Facility planning and site development

    International Nuclear Information System (INIS)

    Reisman, R.C.; Handmaker, H.

    1986-01-01

    Planning for a magnetic resonance imaging (MRI) facility should provide for the efficient operation of current and future MRI devices and must also take into consideration a broad range of general planning principles. Control of budgeted facility costs and construction schedules is of increasing importance due to the magnitude of expense of MRI facility development as well as the need to protect institutional or entrepreneurial investment. In a competitive environment facility costs may be the determining factor in a project's success

  18. Governance in regional development planning?

    DEFF Research Database (Denmark)

    Galland, Daniel

    2008-01-01

    The purpose of this paper is to lay part of the groundwork for a new project aimed at exploring governance aspects concerned with regional development planning (RDP) in Denmark. The fundamental objective is to help establish and clarify a number of research questions to delve into the conditions...... and opportunities for anchoring and implementing such RDP. The paper mainly adopts a descriptive approach to portray tentative pathways to explore and discuss regional governance structures, procedures and practices that are being developed in establishing new RDP processes, strategies and plans....

  19. Spatial Planning and High-tech Development A comparative study of Eindhoven city-region, the Netherlands and Hsinchu City-region, Taiwan

    Directory of Open Access Journals (Sweden)

    Wei-Ju Huang

    2013-08-01

    Full Text Available High-tech development—which lies at the very heart of the processes of economic growth—has been recognised by many developed and developing countries as a strategic instrument to enhance and sustain their competitiveness in the global economic network. Although the concept of high-tech development differs between countries, many share the underlying assumption that the core of high-tech development is to create a sound environment where innovation thrives. This ideology implies a definite spatial dimension. As a result, various spatial strategies have been formulated and implemented to support high-tech development. This has had intentional and unintentional effects on the economy, society and space. Numerous studies have been devoted to exploring, analysing and theorising this global phenomenon. However, there has been less attention given to the role spatial planning may play in the process of high-tech development and to the factors that shape the spatial planning approaches to high-tech development in a particular place. The major objectives of this research are to advance the knowledge of the role of spatial planning in the process of high-tech development, and to establish an analytical framework that helps reveal the major institutional factors that shape spatial planning mechanisms for dealing with the spatial issues of high-tech development in different places. This contributes to the field of high-tech spatial policies transfer and lesson-drawing. In order to explore the major factors that shape the practices of spatial planning in hightech development, a comparative approach is applied in this research. The Eindhoven city-region in the Netherlands and the Hsinchu city-region in Taiwan are selected as case study areas. Both city-regions can be recognised as success stories of high-tech development not only on a national scale but also on a global scale, despite the fact that they apply different approaches. In the Eindhoven city

  20. Developing standardized facility contingency plans

    International Nuclear Information System (INIS)

    Davidson, D.A.

    1993-01-01

    Texaco consists of several operating departments that are, in effect, independent companies. Each of these departments is responsible for complying with all environmental laws and regulations. This includes the preparation by each facility to respond to an oil spill at that location. For larger spills, however, management of the response will rest with corporate regional response teams. Personnel from all departments make up the regional teams. In 1990, Congress passed the Oil Pollution Act. In 1991, the US Coast Guard began developing oil spill response contingency plan regulations, which they are still working on. Meanwhile, four of the five west coast states have also passed laws requiring contingency plans. (Only Hawaii has chosen to wait and see what the federal regulations will entail). Three of the states have already adopted regulations. Given these laws and regulations, along with its corporate structure, Texaco addressed the need to standardize local facility plans as well as its response organization. This paper discusses how, by working together, the Texaco corporate international oil spill response staff and the Texaco western region on-scene commander developed: A standard contingency plan format crossing corporate boundaries and meeting federal and state requirements. A response organization applicable to any size facility or spill. A strategy to sell the standard contingency plan and response organization to the operating units

  1. Sanitation planning in developing countries

    NARCIS (Netherlands)

    Kerstens, S.M.

    2016-01-01

    Sanitation planning in developing countries: Added value of resource recovery

    Worldwide 2.5 billion people lack access to sanitation. This impacts human live, the environment and represents a loss of valuable resources that can be regained from wastewater. This study

  2. Planning of high school examinations in Denmark

    DEFF Research Database (Denmark)

    Vidal, Rene Victor Valqui; Hansen, Michael Pilegaard

    1995-01-01

    This paper presents a computer based support system used to plan high school examinations in Denmark. We will discuss the methods and techniques used to solve such a complex and large scale combinatorial problem. Decomposition and other heuristic principles have been used extensively to develop...

  3. PFP functional development planning guide

    International Nuclear Information System (INIS)

    SINCLAIR, J.C.

    1999-01-01

    The PFP Functional Development Planning Guide presents the strategy and process used for the identification, development, and analysis of functions (activities) necessary to satisfy the requirements within the Plutonium Finishing Plant (PFP) integrated project baseline. The functional analysis will provide the basis for the development of a function driven work breakdown structure. Future revisions to this document will include as attachments the results of the PFP Functional Analysis resulting from this approach. This document is intended be a Project-owned management tool. As such, the guide will periodically require revisions resulting from improvements of the information, processes, and techniques as now described

  4. Planning for energy resource development

    Energy Technology Data Exchange (ETDEWEB)

    Magai, B S [Dept. of Mech. Eng., IIT Bombay, India

    1975-01-01

    A general review is provided of the national energy resources of India. They include wind power, tidal power, geothermal energy, and nuclear fission and fusion. Their present (1975) contribution to India's total energy requirements and the possibility of their accelerated development and impact on the national economy are discussed. Due to the serious proportions which the energy situation is assuming, it is suggested that a national energy council be set up within the Ministry of Energy to review all matters pertaining to energy, and to assume planning and evaluation responsibilities. It is also recommended that a Department of Energy Research, Development, and Demonstration be established as an autonomous agency which would carry out programs in utilization, conservation, environment, economics, and education. Present efforts by various ministries are fragmented and diverge in policy, leadership, and planning. It is believed that the proposed organizations would coordinate energy programs with national objectives.

  5. Sanitation planning in developing countries

    OpenAIRE

    Kerstens, S.M.

    2016-01-01

    Sanitation planning in developing countries: Added value of resource recovery Worldwide 2.5 billion people lack access to sanitation. This impacts human live, the environment and represents a loss of valuable resources that can be regained from wastewater. This study shows that resource recovery can be a potential driver to accelerate sanitation. A new sanitation decision framework for policy makers was created and tested in Indonesia. The variety of advantages and disadvantages of sanitatio...

  6. DWPF Development Plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Holtzscheiter, E.W.

    1994-05-09

    The DWPF Development Plan is based on an evaluation process flowsheet and related waste management systems. The scope is shown in Figure 1 entitled ``DWPF Process Development Systems.`` To identify the critical development efforts, each system has been analyzed to determine: The identification of unresolved technology issues. A technology issue (TI) is one that requires basic development to resolve a previously unknown process or equipment problem and is managed via the Technology Assurance Program co-chaired by DWPF and SRTC. Areas that require further work to sufficiently define the process basis or technical operating envelop for DWPF. This activity involves the application of sound engineering and development principles to define the scope of work required to complete the technical data. The identification of the level of effort and expertise required to provide process technical consultation during the start-up and demonstration of this first of a kind plant.

  7. DWPF Development Plan. Revision 1

    International Nuclear Information System (INIS)

    Holtzscheiter, E.W.

    1994-01-01

    The DWPF Development Plan is based on an evaluation process flowsheet and related waste management systems. The scope is shown in Figure 1 entitled ''DWPF Process Development Systems.'' To identify the critical development efforts, each system has been analyzed to determine: The identification of unresolved technology issues. A technology issue (TI) is one that requires basic development to resolve a previously unknown process or equipment problem and is managed via the Technology Assurance Program co-chaired by DWPF and SRTC. Areas that require further work to sufficiently define the process basis or technical operating envelop for DWPF. This activity involves the application of sound engineering and development principles to define the scope of work required to complete the technical data. The identification of the level of effort and expertise required to provide process technical consultation during the start-up and demonstration of this first of a kind plant

  8. Research and development quality assurance planning

    Energy Technology Data Exchange (ETDEWEB)

    Hoke, P.B.

    1990-05-14

    Planning for quality assurance (QA) in research and development (R D) is like stealing eggs without waking up the chickens. The QA program should be as unobtrusive as possible. Researchers require a QA program that affords them an environment capable of supporting repeatable experiments with accurate data without unduly stifling their creative abilities. Careful advance planning ensures that the intensity of control provided by quality-related systems is commensurate with the importance and scope of the activities being performed. Good scientific practices applied to small bench-scale projects may require minimal additional controls. As projects increase in size and complexity the controls imposed through planning must, by necessity, be increased. Research and development QA planning, just like any other planning, involves all affected individuals. The application of control systems is determined by factors such as customer or sponsor requirements, the importance of an item or activity to the experiment's success, and the organizational complexity of the project. Many larger experiments are highly dependent on quality-related support activities such as calibration, engineering design, and inspection provided by organizations outside the R D group. Since, in most cases, the expense of support activities is taken directly from funds available for research, it is important for the researchers to be involved in the planning efforts to help determine and agree with the level of QA effort required. A single plan will often suffice for organizations engaged in large numbers of similar experiments. Complex experiments may require unique QA plans or additions to existing plans. Once implemented, the R D QA plans, like any others, require audits or surveillances and may require revisions if the scope of the experiment changes. 1 ref., 1 fig.

  9. Research and development quality assurance planning

    International Nuclear Information System (INIS)

    Hoke, P.B.

    1990-01-01

    Planning for quality assurance (QA) in research and development (R ampersand D) is like stealing eggs without waking up the chickens. The QA program should be as unobtrusive as possible. Researchers require a QA program that affords them an environment capable of supporting repeatable experiments with accurate data without unduly stifling their creative abilities. Careful advance planning ensures that the intensity of control provided by quality-related systems is commensurate with the importance and scope of the activities being performed. Good scientific practices applied to small bench-scale projects may require minimal additional controls. As projects increase in size and complexity the controls imposed through planning must, by necessity, be increased. Research and development QA planning, just like any other planning, involves all affected individuals. The application of control systems is determined by factors such as customer or sponsor requirements, the importance of an item or activity to the experiment's success, and the organizational complexity of the project. Many larger experiments are highly dependent on quality-related support activities such as calibration, engineering design, and inspection provided by organizations outside the R ampersand D group. Since, in most cases, the expense of support activities is taken directly from funds available for research, it is important for the researchers to be involved in the planning efforts to help determine and agree with the level of QA effort required. A single plan will often suffice for organizations engaged in large numbers of similar experiments. Complex experiments may require unique QA plans or additions to existing plans. Once implemented, the R ampersand D QA plans, like any others, require audits or surveillances and may require revisions if the scope of the experiment changes. 1 ref., 1 fig

  10. Municipal Development Plan, Acerra (Naples

    Directory of Open Access Journals (Sweden)

    Luigi Benevolo

    2014-02-01

    Full Text Available The Municipal Development Plan (Piano Urbanistico Comunale - PUC of Acerra has been drafted by a group of young professionals and researchers, led by Leonardo Benevolo, in accordance with the guidelines laid out by Regional Law no. 16 of 2004. Its complex drafting process was compressed into a brief, nine-month period in 2008 and 2009, at the end of which its initial adoption (or “predisposizione” – “preparation” or “predisposition” – in Italian legal terms was ratified by the municipal council. This article reconstructs the key moments, illustrating the main elements of the plan and how the debate about it took shape both inside and outside the municipal administration.

  11. PFP requirements development planning guide

    International Nuclear Information System (INIS)

    SINCLAIR, J.C.

    1999-01-01

    The PFP Requirements Development Planning Guide presents the strategy and process used for the identification, allocation, and maintenance of requirements within the Plutonium Finishing Plant (PFP) integrated project baseline. Future revisions to this document will be included as attachments (e.g., results of the PFP Requirements Analysis attributable to this approach). This document is intended be a Project-owned management tool. As such, this document will periodically require revisions resulting from improvements of the information, processes, and techniques as now described. Future updates may be made to this document by PFP management and final approval of the content will be accomplished in a Baseline Change Request as it impacts the Multi-Year Work Plan, or baseline information managed in the Hanford Site Systems Engineering Baseline

  12. Kuroshio power plant development plan

    International Nuclear Information System (INIS)

    Chen, Falin

    2010-01-01

    As a country lacking energy reserves, Taiwan imports 99.2% of its energy, with only a small portion of indigenous energy, such as hydro, wind, and solar. In 2008, each Taiwanese spent 85,000 NTD dollars (1 USD ∝ 32 NTD) to purchase oil, coal, gas, and nuclear fuel from foreign countries, accounting for a total payment of 1.8 trillion NTD, more than the annual budget of the Taiwan government of 1.7 trillion NTD. In the same year, Taiwan emitted about 1% of the world's greenhouse gas (GHG), or 12 tons per person-year, ranking 18th globally. These situations in terms of energy security and carbon emission are very severe. To resolve these severe situations, harnessing the power of the Kuroshio in eastern Taiwan offers a great opportunity. The Kuroshio is a branch of the North Pacific Ocean current. Due to the westward-enhanced effect, this ocean current is strong and stable as it passes through eastern Taiwan. The flow rate is about 30 sverdrup (Sv) or 1000 times that of the Yangtze River, the average speed is 1 m/s, the flow direction is fixed to the north, and the flow path is close to the east coast of Taiwan. By precisely locating high-quality sites and implementing sequential works with careful planning, one can possibly generate exploitable power more than 30 GW. With 30 GW of clean energy, Taiwan could effectively enhance energy security, reduce GHG emission, and lower energy-purchasing cost. This paper proposes a feasibility study to explore the power of the Kuroshio. The content consists of four parts: (1) assessment of Kuroshio power reserves, (2) development of turbine generators, (3) development of turbine-anchor system, and (4) deep-sea marine engineering of turbine clusters. By integrating these technologies above, we propose a project to construct a 30 MW pilot plant. In this project, we also discuss the financial analysis and propose new regulations, environmental impact analysis, risk assessment, and other relevant issues. (author)

  13. Manpower development - planning and implementation

    International Nuclear Information System (INIS)

    Scholten, V.W.

    1978-01-01

    The demands of a nuclear technology programme on the manpower resources of a developing country are very onerous. Unlike other industries, as well as the planning and operating staff, nuclear technology requires an additional administrative infrastructure to regulate the various activities. To minimize the effect of manpower shortage, the planning and development of manpower resources need to be carried out on a national scale. To introduce a nuclear programme, a special preparatory phase is required. During this phase the special conditions appertaining to the country are first considered, as are the evaluation and then the promotional aspects of the programme. In a second phase, all the partners involved in the implementation are considered, with reference to their roles and interrelationships. Their various tasks and obligations are fully assessed. This is a wide-ranging study covering, in addition to the construction of a nuclear power plant, the industrial collaboration and licensing agreements, and the utility operational training schemes. Finally, the third phase considers the different and necessary educational requirements, and the existent and developed level of the manpower, with respect to the scope and content of the know-how transfer. When all the relevant aspects have been considered, the expansion of the universities and educational establishments must be carried out. This whole phase needs to be started as early as possible because it involves a period of some years. (author)

  14. Develop a Professional Learning Plan

    Science.gov (United States)

    Journal of Staff Development, 2013

    2013-01-01

    A professional learning plan establishes short-and long-term plans for professional learning and implementation of the learning. Such plans guide individuals, schools, districts, and states in coordinating learning experiences designed to achieve outcomes for educators and students. Professional learning plans focus on the program of educator…

  15. Large-scale, high-resolution wind resource mapping for wind farm planning and development in South Africa

    DEFF Research Database (Denmark)

    Mortensen, Niels Gylling; Badger, Jake; Hansen, Jens Carsten

    2014-01-01

    estimates are designed for national and provincial planning and strategic environmental impact assessment for wind power in South Africa and the results have therefore been made available in common GIS formats. The database of results is in the public domain and can be downloaded from the WASA web site...

  16. Planning for high performance project teams

    International Nuclear Information System (INIS)

    Reed, W.; Keeney, J.; Westney, R.

    1997-01-01

    Both industry-wide research and corporate benchmarking studies confirm the significant savings in cost and time that result from early planning of a project. Amoco's Team Planning Workshop combines long-term strategic project planning and short-term tactical planning with team building to provide the basis for high performing project teams, better project planning, and effective implementation of the Amoco Common Process for managing projects

  17. 1994 Site Development Plan: A plan with vision

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-01

    The 1994 Lawrence Livermore National Laboratory Site Development Plan has been developed during a period of great change and uncertainty. Our goal is to make possible the best use of the Laboratory`s resources to meet shifting national priorities in the post-Cold War world. Site Planning is an important component of the overall Laboratory strategic planning process. This plan focuses on opportunities for the Laboratory as well as on key site development issues including facility construction, redevelopment and reuse, site accessibility, and security. A major challenge is to achieve sufficient stability in the site planning and execution so that the processes of construction can occur efficiently while at the same time providing sufficient flexibility in site facilities so that a range of changing national needs can be accommodated. We are closely coupled to the DOE strategic planning process to meet this challenge.

  18. Information Communication Technology Planning in Developing Countries

    Science.gov (United States)

    Malapile, Sandy; Keengwe, Jared

    2014-01-01

    This article explores major issues related to Information Communication Technology (ICT) in education and technology planning. Using the diffusion of innovation theory, the authors examine technology planning opportunities and challenges in Developing countries (DCs), technology planning trends in schools, and existing technology planning models…

  19. Participatory development planning in Botswana: Exploring the ...

    African Journals Online (AJOL)

    the significance of public participation in planning is the ... to participatory planning, Botswana's planning system remains non-participatory. What is perceived as a ..... Administration. Despite the above, the. Tribal Administration remains important to the development planning efforts in Botswana. This could be attributed.

  20. Distance Learning Plan Development: Initiating Organizational Structures

    National Research Council Canada - National Science Library

    Poole, Clifton

    1998-01-01

    .... Army distance learning plan managers to examine the DLPs they were directing. The analysis showed that neither army nor civilian distance learning plan managers used formalized requirements for organizational structure development (OSD...

  1. Geothermal development plan: Maricopa County

    Energy Technology Data Exchange (ETDEWEB)

    White, D.H.; Goldstone, L.A.

    1982-08-01

    The Maricopa County Geothermal Development Plan evaluated the market potential for utilizing geothermal energy. The study identified six potential geothermal resource areas with temperatures less than 100{sup 0}C (212{sup 0}F) and in addition, four suspected intermediate temperature areas (90{sup 0} to 150{sup 0}C, 194{sup 0} to 300{sup 0}F). Geothermal resources are found to occur in and near the Phoenix metropolitan area where average population growth rates of two to three percent per year are expected over the next 40 years. Rapid growth in the manufacturing, trade and service sectors of the regional economy provides opportunities for the direct utilization of geothermal energy. A regional energy use analysis is included containing energy use and price projections. Water supplies are found to be adequate to support this growth, though agricultural water use is expected to diminish. The study also contains a detailed section matching geothermal resources to potential users. Two comparative analyses providing economic details for space heating projects are incorporated.

  2. Preparation of development plan for the gas-condensate pool with the use of a high speed computer (IBM-1620)

    Energy Technology Data Exchange (ETDEWEB)

    Shirkovsky, A I; Kumar, S

    1968-01-01

    The computation of all the technical, technological, and economic figures for a gas supply system by using the High Speed Computer IBM-1620 is presented. The gas supply system consists of a gas-condensate pool (source) and main gas pipeline from the pool to the consumer. All necessary analytical equations for correlating geological, technological, and economic variables have been used. Results of calculations and recommendations for the most profitable variant are given. Effects of geological, technological, and technical factors upon the economic figures are also shown.

  3. Developing formal asset management plans

    Science.gov (United States)

    2014-06-01

    This report highlights key recommendations and best practices identified at the peer exchange on Transportation Asset Management Plans (TAMP), held on February 5 and 6, 2014, in Columbia, South Carolina. This event was sponsored by the Transportation...

  4. Junior High Career Planning: What Students Want

    Science.gov (United States)

    Bardick, Angela D.; Bernes, Kerry B.; Magnusson, Kris C.; Witko, Kim D.

    2004-01-01

    This research used "The Comprehensive Career Needs Survey" to assess the career counselling needs of 3,562 junior high students in Southern Alberta. This article examines junior high students' responses regarding their perceptions of (a) the relevance of career planning, (b) who they would approach for help with career planning, and (c)…

  5. Planning developments in British Nuclear Fuels Ltd

    Energy Technology Data Exchange (ETDEWEB)

    Roper, D A [British Nuclear Fuels Ltd., Risley

    1978-10-01

    The state of the corporate planning art in British Nuclear Fuels Ltd. was described by N.R.Geary (Long Range Planning, September (1973)) just 2 years after Company formation. This article discusses more recent planning developments over the period to date during which the Company adopted a Divisionalized structure (from October 1974) and has been required to submit an annual Company plan to the Department of Energy (from November 1975). Background information on the origin and nature of the BNFL and its business, and the particular features of the Company which reflect into the nature and method of its planning were given in the 1973 article and only a brief introductory updating of the Company position is included here. Subsequently the features and problems of BNFL's operating and development planning system are described. Finally, messages arising from BNFL's planning experience to date which may be of general application and therefore of value to other practitioners of planning are listed.

  6. Daybreak - a corporation plan of development and capacitation; Amanecer - un plan corporativo de desarollo y capacitacion

    Energy Technology Data Exchange (ETDEWEB)

    Pellegrini, Enzo [REPSOL Yacimientos Petroliferos Fiscales S.A. (Argentina)

    2000-07-01

    The current growth in production investments is motivating a war for talent which demands from companies a serious compromise to the recruiting of personnel as well as development and training policies that will build: technical competencies related to teamwork; high tech tools and knowledge; general training that will nourish employability in an increasingly competitive environment. Repsol YPF Group, within its Corporate Plan for Development and Training, implemented Plan Amanecer. Following is a general outline of the Plan. (author)

  7. Medical RI development plan of KOMAC

    Science.gov (United States)

    Kim, Kye-Ryung; Jung, Myung-Hwan; Yoon, Sang-Pil; Min, Yi-Sub; Cho, Yong-Sub

    2017-12-01

    Many kinds of radioisotopes (RIs) produced by the high energy (100 200 MeV) proton accelerators are developed by the foreign R&D institutes and the worldwide demands are being increased continuously. The RI production using high energy proton beam higher than 50 MeV was not considerable because of the limit of the proton beam energy from existing proton accelerator facilities in Korea before 2013. The available maximum proton energy was 50 MeV from MC-50 cyclotron of Korea Institute of Radiological and Medical Sciences (KIRAMS) at that time. After the construction of a 100 MeV high-current and high-energy proton accelerator and a new irradiation facility for the RI production in 2013 and 2016 by the Korea Multi-purpose Accelerator Complex (KOMAC) at Korea Atomic Energy Research Institute (KAERI), we can make a plan for the new RI production of Cu-67, Sr-82 and so on. In the medical application fields, the worldwide demand of Sr-82 is being increased rapidly during last several years and the domestic demand of Cu-67 is also expected to be increased in near future. And alpha-emitters, such as Ac-225 and Ra-223, are becoming attractive to the users in the medical science fields in the future. The RI development plan of KOMAC was specified recently reflecting the recent environment changes and requirements from the users. In this paper, the results and present status of RI production and R&D facilities, calculation results related to the RI production yields, and future plans is presented.

  8. Long term planning for wind energy development

    International Nuclear Information System (INIS)

    Trinick, M.

    1995-01-01

    In a planning system intended to be governed primarily by policies in statutory plans a reasonable horizon for long term planning is 10 years or longer. Because of statutory requirements, developers have no option but to pay due regard to, and take a full part in, long term planning. The paper examines the type of policies which have emerged in the last few years to cater for wind energy development. It canvasses the merits of different types of policies. Finally, it discusses the policy framework which may emerge to cater for development outside NFFO. (Author)

  9. Evaluation of Plan Implementation: Peri-urban Development and the Shanghai Master Plan 1999-2020

    Directory of Open Access Journals (Sweden)

    Jinghuan He

    2015-01-01

    guided by the Plan 1999. It is not surprising that plans are left behind in the context of such unprecedented growth, but the pilot programmes and the key projects proposed in the Plan 1999 were implemented with a high level of conformance. However, the Plan 1999 performed differently in local urban projects, with varying degrees of project conformity, development process and development timing. Second, there was variation in the delivery of the main objectives to the subsequent urban plans, the consistency between the Plan 1999 and the related sector plans, the ways of interaction between involved actors and their reactions to the plan, and the methods of land development. Overall, the Plan 1999 performed better in the case of North Jinqiao Export Processing Zone because the governments (at both national and municipal levels intervened more in the development process, compared with the case of Xinmin Development Area. The performance of the plan is closely related to the level of conformity between the plan and the actual development. Therefore, although the conformance-based and performance-based approaches to implementation can be separated conceptually, they are very interconnected in practice. Third, the urban planning system in Shanghai has experienced a structural reorganization in terms of the system of plans, the involved actors and the planning instruments since the late 1980s. But the emphasis on the rational technocratic process used in the 1960s in the western society is still predominant in the planning system in Shanghai. Aside from the demanding urban growth, the other reason of non-conformance between the actual peri-urban development and the Plan 1999 and bad performance of the Plan 1999 in local projects is a big gap between the seemingly rational operation of the urban planning system and the reality of external challenges. The current planning system lacks proper coordination with the external challenges, such as insufficient investigation of the

  10. Environmental development plan. LWR commercial waste management

    International Nuclear Information System (INIS)

    1980-08-01

    This Environmental Development Plan (EDP) identifies the planning and managerial requirements and schedules needed to evaluate and assess the environmental, health and safety (EH and S) aspects of the Commercial Waste Management Program (CWM). Environment is defined in its broadest sense to include environmental, health (occupational and public), safety, socioeconomic, legal and institutional aspects. This plan addresses certain present and potential Federal responsibilities for the storage, treatment, transfer and disposal of radioactive waste materials produced by the nuclear power industry. The handling and disposal of LWR spent fuel and processed high-level waste (in the event reprocessing occurs) are included in this plan. Defense waste management activities, which are addressed in detail in a separate EDP, are considered only to the extent that such activities are common to the commercial waste management program. This EDP addresses three principal elements associated with the disposal of radioactive waste materials from the commercial nuclear power industry, namely Terminal Isolation Research and Development, Spent Fuel Storage and Waste Treatment Technology. The major specific concerns and requirements addressed are assurance that (1) radioactivity will be contained during waste transport, interim storage or while the waste is considered as retrievable from a repository facility, (2) the interim storage facilities will adequately isolate the radioactive material from the biosphere, (3) the terminal isolation facility will isolate the wastes from the biosphere over a time period allowing the radioactivity to decay to innocuous levels, (4) the terminal isolation mode for the waste will abbreviate the need for surveillance and institutional control by future generations, and (5) the public will accept the basic waste management strategy and geographical sites when needed

  11. Contextualising the National Development Plan for enhanced ...

    African Journals Online (AJOL)

    ... and Development. Strategy, Integrated Development Planning, enhanced service delivery .... Penderis (2012: 7) proffers that there is a vast body of ..... the various chapters, objectives and actions of the ..... financing and formulation of the ten.

  12. Analysis of Development Plans from Communications Perspective

    Directory of Open Access Journals (Sweden)

    Zohreh Shahghasemi

    2016-12-01

    Full Text Available The movement towards the goals of "Vision plan 1404" needs the perception of the requirements to prepare plans for achieving the favorite objectives of development. With the advent of the information age, the rules of development policy-making strongly have changed in the world and also unique opportunities areprovided by variables of communications for countries that have been in early stages of development. Based on this, considering the communications in macro-level and in the political, social, economic and cultural development plans is important and necessary. This requires a review and pathology of previous plans and evaluation of their strengths and weaknesses for preparing of more comprehensive future plans. Themain question of this study is: what is the approach of development plans to communications section after Islamic revolution?  Which aspects of communications are considered, and what aspects are ignored?  This study analyzes five development plans after the revolution, by using of qualitative content analysis. Results show that in all five-year plans the focus was on hardware and quantitative dimensions of communication development and media, but qualitative and content aspects, such as the right to universal access to information, freedom to obtain and disseminate information within the constitution, freedom of speech and press, a move towards the information society and knowledge-based, also other dimensions of communications such as human, traditional and social communication has been less considered. In the fourth development plan that is "knowledge" – centered, new fields of communications has been studied comprehensively in comparison to other plans. According to these approaches and new scientific and experimental perspectives, this paper suggests further engagement in communications necessity for development policy-making.

  13. Chicago-St. Louis high speed rail plan

    International Nuclear Information System (INIS)

    Stead, M.E.

    1994-01-01

    The Illinois Department of Transportation (IDOT), in cooperation with Amtrak, undertook the Chicago-St. Louis High Speed Rail Financial and Implementation Plan study in order to develop a realistic and achievable blueprint for implementation of high speed rail in the Chicago-St. Louis corridor. This report presents a summary of the Price Waterhouse Project Team's analysis and the Financial and Implementation Plan for implementing high speed rail service in the Chicago-St. Louis corridor

  14. Chicago-St. Louis high speed rail plan

    Energy Technology Data Exchange (ETDEWEB)

    Stead, M.E.

    1994-12-31

    The Illinois Department of Transportation (IDOT), in cooperation with Amtrak, undertook the Chicago-St. Louis High Speed Rail Financial and Implementation Plan study in order to develop a realistic and achievable blueprint for implementation of high speed rail in the Chicago-St. Louis corridor. This report presents a summary of the Price Waterhouse Project Team`s analysis and the Financial and Implementation Plan for implementing high speed rail service in the Chicago-St. Louis corridor.

  15. High voltage electricity installations a planning perspective

    CERN Document Server

    Jay, Stephen Andrew

    2006-01-01

    The presence of high voltage power lines has provoked widespread concern for many years. High Voltage Electricity Installations presents an in-depth study of policy surrounding the planning of high voltage installations, discussing the manner in which they are percieved by the public, and the associated environmental issues. An analysis of these concerns, along with the geographical, environmental and political influences that shape their expression, is presented. Investigates local planning policy in an area of the energy sector that is of highly topical environmental and public concern Cover

  16. Integrated sustainable development and energy resource planning

    OpenAIRE

    Virgiliu NICULA

    2011-01-01

    Integrated sustainable development of a country cannot be conceived and begun without considering in an intricate tandem environmental protection and economic development. No one can exist without a natural material support of the life he or she enjoys. All economic development plans must include environmental and human civilization’s protection implicitly. Integrated resource planning must be done in an absolutely judicious manner, so we can all leave as a legacy for future generations both ...

  17. A Development Curriculum Plan To Achieve a Sequenced Curriculum between High School Courses in Automotive Mechanics and the Mattatuck Community College Automotive Technician Program. Final Report.

    Science.gov (United States)

    Mattatuck Community Coll., Waterbury, CT.

    This document contains a developmental curriculum plan for an articulated curriculum in automotive mechanics for Connecticut's Mattatuck Community College and area high schools. The curriculum guide includes a course description, criteria for evaluation, attendance policy, objectives, a curriculum outline, a three-part automotive technician test,…

  18. Naval Medical Research and Development Strategic Plan

    Science.gov (United States)

    2008-03-01

    the strategic planning program for action. The pros and cons of the current NMR&D organization structure, management support funding, and officer...Distribution List D-4 Naval Medical Research and Development Strategic Plan March 2008 SWE Naval Surface Warfare Enterprise SWOT Strengths

  19. Our strategic plan | IDRC - International Development Research ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Knowledge. Innovation. Solutions. IDRC's strategic plan, Investing in Solutions, will guide our efforts from 2015 to 2020. Building on more than four decades of experience, the plan reaffirms our vision to produce knowledge, support innovation, and generate solutions to improve lives and livelihoods in the developing world.

  20. Career Planning: Developing the Nation's Primary Resource.

    Science.gov (United States)

    Jarvis, Phillip S.

    Career planning is the most critical ingredient in developing a nation's primary resource, its workers. A 1988 Gallup Poll showed that 62 percent of U.S. workers had no career goal when they began their first job, and more than 50 percent felt they were in the wrong job. The same results probably could be applied to Canada. Career planning skills…

  1. Equal employment opportunity plan development guidance

    Energy Technology Data Exchange (ETDEWEB)

    None

    1978-09-01

    The purpose of this publication is to provide instructions for the development of EEO Plans for Fiscal Year 1979. It supplements the National EEO Plan for the Department of Energy issued in August 1978 (DOE/S-0002). The material included should be used immediately as guidance to develop, document, and implement subordinate echelon commitments to EEO. A schedule for the development and submission of EEO Plans is included. Most of the continuing requirements will be published at a later date as part of the directives system. Any comments or helpful suggestions concerned with the program outlined would be appreciated by the Office of Equal Opportunity.

  2. History of Planning Structure Development in Irkutsk

    Science.gov (United States)

    Kulakov, A. I.; Ree, A. U.

    2017-11-01

    The development of Irkutsk was spontaneous; the first streets represented a rather complex system of streets, dead ends, lanes. Throughout the history of the city, several general plans and development projects have been implemented (but not completely). Unlike other large Siberian cities (Novosibirsk, Krasnoyarsk), Irkutsk managed to preserve its historical appearance, architecture and initial planning. During its history the city has passed five stages of the planning structure development. The first stage of the city’s history coincides with the formation of the Russian settlements network in Eastern Siberia from the middle of the 17th to the end of the 18th centuries. Like many other Siberian cities, Irkutsk began its evolution from a fortified stockaded town. By the end of the 17th century a trading quarter appeared outside its walls. Currently, the city is developing and growing, so, a relevant issue of the further development direction of the Irkutsk planning structure naturally arises.

  3. Fuel Fabrication Capability Research and Development Plan

    Energy Technology Data Exchange (ETDEWEB)

    Senor, David J.; Burkes, Douglas

    2014-04-17

    The purpose of this document is to provide a comprehensive review of the mission of the Fuel Fabrication Capability (FFC) within the Global Threat Reduction Initiative Convert Program, along with research and development (R&D) needs that have been identified as necessary to ensuring mission success. The design and fabrication of successful nuclear fuels must be closely linked endeavors. Therefore, the overriding motivation behind the FFC R&D program described in this plan is to foster closer integration between fuel design and fabrication to reduce programmatic risk. These motivating factors are all interrelated, and progress addressing one will aid understanding of the others. The FFC R&D needs fall into two principal categories, 1) baseline process optimization, to refine the existing fabrication technologies, and 2) manufacturing process alternatives, to evaluate new fabrication technologies that could provide improvements in quality, repeatability, material utilization, or cost. The FFC R&D Plan examines efforts currently under way in regard to coupon, foil, plate, and fuel element manufacturing, and provides recommendations for a number of R&D topics that are of high priority but not currently funded (i.e., knowledge gaps). The plan ties all FFC R&D efforts into a unified vision that supports the overall Convert Program schedule in general, and the fabrication schedule leading up to the MP-1 and FSP-1 irradiation experiments specifically. The fabrication technology decision gates and down-selection logic and schedules are tied to the schedule for fabricating the MP-1 fuel plates, which will provide the necessary data to make a final fuel fabrication process down-selection. Because of the short turnaround between MP-1 and the follow-on FSP-1 and MP-2 experiments, the suite of specimen types that will be available for MP-1 will be the same as those available for FSP-1 and MP-2. Therefore, the only opportunity to explore parameter space and alternative processing

  4. Stoffenmanager Development and future plans

    NARCIS (Netherlands)

    Hollander, A.; Ustailieva, E.; Heussen, H.

    2012-01-01

    Stoffenmanager is one of the most advanced tools for managing hazardous chemicals at the work place. The workshop will provide an English language forum for international organisations, companies and authorities interested in the development and implementation of country versions of Stoffenmanager.

  5. Development planning and employment generations: achievements ...

    African Journals Online (AJOL)

    Development planning and employment generations: achievements, challenges and ... Open Access DOWNLOAD FULL TEXT ... The paper mainly utilizes secondary data through the analysis of books, journals, reports and electronic sources.

  6. Quality Assurance Project Plan Development Tool

    Science.gov (United States)

    This tool contains information designed to assist in developing a Quality Assurance (QA) Project Plan that meets EPA requirements for projects that involve surface or groundwater monitoring and/or the collection and analysis of water samples.

  7. Idaho National Engineering Laboratory site development plan

    International Nuclear Information System (INIS)

    1994-09-01

    This plan briefly describes the 20-year outlook for the Idaho National Engineering Laboratory (INEL). Missions, workloads, worker populations, facilities, land, and other resources necessary to fulfill the 20-year site development vision for the INEL are addressed. In addition, the plan examines factors that could enhance or deter new or expanded missions at the INEL. And finally, the plan discusses specific site development issues facing the INEL, possible solutions, resources required to resolve these issues, and the anticipated impacts if these issues remain unresolved

  8. Driving change : sustainable development action plans Guidance

    OpenAIRE

    Sustainable Development Commission

    2008-01-01

    This guidance builds upon the Sustainable Development Commission’s previous guidance, Getting Started (August 2005), which set out the basic elements that the Sustainable Development Commission would expect to see in a good Sustainable Development Action Plan. Publisher PDF Original published August 2005.

  9. PSSD - Planning System for Sustainable Development

    DEFF Research Database (Denmark)

    PSSD - Planning System for Sustainable Development - is a part of the Baltic Sea Region's INTERREG II C program. The current report describes some theories, methods and tools developed under the PSSD project. First, the theoretical foundation of the project is described. Secondly, the role...... of indicators in sustainable development is discussed and a Web-based indicator generator is described. Thirdly, we describe a number of methods and tools, which support planning for sustainable development. Finally, some technical interface tools - especially a Web-based interface to the methods and tools...

  10. Spatial Planning and High-tech Development : A comparative study of Eindhoven city-region, the Netherlands and Hsinchu City-region, Taiwan

    NARCIS (Netherlands)

    Huang, W.J.

    2013-01-01

    High-tech development—which lies at the very heart of the processes of economic growth—has been recognised by many developed and developing countries as a strategic instrument to enhance and sustain their competitiveness in the global economic network. Although the concept of high-tech development

  11. Forward-Looking Planning of Technology Development

    Directory of Open Access Journals (Sweden)

    Katarzyna Halicka

    2015-12-01

    Full Text Available The main aim of this article is to adapt the Future-Oriented Technology Analysis (FTA to prospective planning of technology development. Firstly, the article presents the assumptions, methods and idea, as well as the concept of the FTA method. Moreover, selected publications on the use of this method were analysed. Then, an original, base model of forward-looking planning of technology development was constructed and presented. The end result of this process will be the development of the localized in time, presented in graphic form, action plan referred to as the route of technology development. Basing on the literature review and the research projects a preliminary route of development of arbitrarily chosen technology was also built and presented.

  12. Understanding the population dimension in development planning.

    Science.gov (United States)

    Rivera, P C

    1983-01-01

    In the Philippines initial efforts to adopt population policies focused on reducing rapid population growth through fertility control. The history of the national population welfare congress, which started in 1978, reflects this emphasis on family planning as a major deterrent to rapid population growth. It was only in recent years that the 2-way relationship between population and development came to be better appreciated. The 6th National Populaton Welfare Congress was a response to this need to broaden the scope of population concerns and integrate the population dimension into development planning. This viewpoint regards population not as a demand variable but as a factor that can be influenced by economic and social development. Dr. Mercedes B. Concepcion, dean of the University of the Philippines Population Institute (UPPI), discussed population trends, prospects, and problems in a paper presented before the 6th congress. In 1980, she said, the Philippine population was 48.1 million persons, up by 11.4 million persons or 31%, over the3l.7 million enumerated in 1970. While the rate of populated growth remains high, data indicate a decreasing post-World War II trend, from 3.06% in 1948-60 to 2.68% in 1975-80. The proportion of the population below 15 has dropped by 2 percentage points, while the number of persons in the working ages 15-64 has increased. In 1 of the 3 group sessions during the congress, the participants tried to define the Philippines' population distribution goals, the requirement of an urban-rural balance, and priority intervention areas. In that session 2 main papers were presented -- one on human settlements and urbanization and the other on macroeconomic policies and their spatial implications. In another sessionplanners and researchers examined the socioeconomic and demographic impact of development programs, specifically the impact of rural electrification on fertility change in Misamis Oriental, a province in Southern Philippines. In the

  13. Developing a disposal and remediation plan

    International Nuclear Information System (INIS)

    Messier, T.S.

    1999-01-01

    The environmental release of wastes generated by the upstream oil and gas industry in Alberta can result in polluted soil and groundwater at several facilities across the province. Responsibility for decommissioning upstream oil and gas facilities falls under the jurisdiction of the Alberta Energy and Utilities Board (EUB) and Alberta Environmental Protection (AEP). This paper outlines a protocol that can serve as a framework for the development of a plan to dispose of oilfield waste and to remediate related contaminated soils. The components involved in developing a disposal and remediation plan for oilfield wastes are: (1) identifying the potential source of pollution and oilfield waste generation, (2) characterizing oilfield wastes, (3) determining the nature and extent of soil and groundwater pollution, (4) preparing a remedial action plan, (5) assessing the viability of various remediation options, and (6) preparing health and safety plan. 12 refs., 2 tabs., 2 figs

  14. Solid waste management complex site development plan

    International Nuclear Information System (INIS)

    Greager, T.M.

    1994-01-01

    The main purpose of this Solid Waste Management Complex Site Development Plan is to optimize the location of future solid waste treatment and storage facilities and the infrastructure required to support them. An overall site plan is recommended. Further, a series of layouts are included that depict site conditions as facilities are constructed at the SWMC site. In this respect the report serves not only as the siting basis for future projects, but provides siting guidance for Project W-112, as well. The plan is intended to function as a template for expected growth of the site over the next 30 years so that future facilities and infrastructure will be properly integrated

  15. Highlights of the SSC Site Development Plan

    International Nuclear Information System (INIS)

    Sanford, J.R.

    1991-10-01

    This paper summarizes highlights of the Site Development Plan for the Superconducting Super Collider Laboratory. The Plan, sometimes called a Master Plan, was prepared by the architectural and engineering firm for the Laboratory: Parsons Brinckerhoff/Morrison Knudsen (PB/MK) working in association with CRSS. Their task was to interpret the SSC project needs in the context of the Ellis County, Texas site. The team effort was under the direction of Lewis May from CRSS, guided by Robert Sims from the SSC Laboratory. Conceptual drawings are presented in this report

  16. Solid waste management complex site development plan

    Energy Technology Data Exchange (ETDEWEB)

    Greager, T.M.

    1994-09-30

    The main purpose of this Solid Waste Management Complex Site Development Plan is to optimize the location of future solid waste treatment and storage facilities and the infrastructure required to support them. An overall site plan is recommended. Further, a series of layouts are included that depict site conditions as facilities are constructed at the SWMC site. In this respect the report serves not only as the siting basis for future projects, but provides siting guidance for Project W-112, as well. The plan is intended to function as a template for expected growth of the site over the next 30 years so that future facilities and infrastructure will be properly integrated.

  17. Motivations and Barriers for Policymakers to Developing State Adaptation Plans

    Science.gov (United States)

    Miller, R.; Sylak-Glassman, E.

    2016-12-01

    Current approaches for developing high-quality adaptation plan require significant resources. In recent years, communities have grown to embrace adaptive plans across multiple forms, including adaptive capacity assessments, resilience strategies, and vulnerability assessments. Across the United States, as of this writing, 14 states have established adaptation plans, with another 8 states having begun the process. Given the high resources requirements and increasing interest in the development of adaptation plans, we aim to examine patterns behind the establishment of resilience plans at the state level. We examine demographic, financial, political, and physical characteristics associated with different states in an effort to explore the reasoning behind investing in the development of adaptation plans. This analysis considers quantitative and qualitative factors, including recent elections for political parties, politicians' climate-related statements and campaign promises, demographics, budgets, and regional climate threats. The analysis aims to identify motivations for state leadership taking action to develop adaptation plans. Results from the analysis seek to identify the primary drivers and barriers associated with state-wide resilience planning. These results could inform the design of scientific communication tools or approaches to aid future adaptation responses to climate change.

  18. Development of a transportation planning tool

    International Nuclear Information System (INIS)

    Funkhouser, B.R.; Moyer, J.W.; Ballweg, E.L.

    1994-01-01

    This paper describes the application of simulation modeling and logistics techniques to the development of a planning tool for the Department of Energy (DOE). The focus of the Transportation Planning Model (TPM) tool is to aid DOE and Sandia analysts in the planning of future fleet sizes, driver and support personnel sizes, base site locations, and resource balancing among the base sites. The design approach is to develop a rapid modeling environment which will allow analysts to easily set up a shipment scenario and perform multiple ''what if'' evaluations. The TPM is being developed on personal computers using commercial off-the shelf (COTS) software tools under the WINDOWS reg-sign operating environment. Prototype development of the TPM has been completed

  19. Milestones in Language Planning and Development Aid

    Science.gov (United States)

    Coleman, Hywel

    2017-01-01

    This paper tracks the changing relationships between language planning and development aid over a period of 70 years from the end of the Second World War to the present day. Drawing on documentary resources--in particular, the published proceedings of the Language and Development Conferences (LDCs)--the paper identifies a number of significant…

  20. Regional Development Planning in Ethiopia: Past Experience ...

    African Journals Online (AJOL)

    Regional Development Planning in Ethiopia: Past Experience, Current Initiatives and Future Prospects. ... Eastern Africa Social Science Research Review ... The main contention of the paper is that in the past, regional development, in line with the functional integration approach, was considered a national project.

  1. High-Penetration Photovoltaic Planning Methodologies

    Energy Technology Data Exchange (ETDEWEB)

    Gao, David Wenzhong [Alternative Power Innovations, LLC, Broomfield, CO (United States); Muljadi, Eduard [National Renewable Energy Lab. (NREL), Golden, CO (United States); Tian, Tian [National Renewable Energy Lab. (NREL), Golden, CO (United States); Miller, Mackay [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2017-02-24

    The main objective of this report is to provide an overview of select U.S. utility methodologies for performing high-penetration photovoltaic (HPPV) system planning and impact studies. This report covers the Federal Energy Regulatory Commission's orders related to photovoltaic (PV) power system interconnection, particularly the interconnection processes for the Large Generation Interconnection Procedures and Small Generation Interconnection Procedures. In addition, it includes U.S. state interconnection standards and procedures. The procedures used by these regulatory bodies consider the impacts of HPPV power plants on the networks. Technical interconnection requirements for HPPV voltage regulation include aspects of power monitoring, grounding, synchronization, connection to the overall distribution system, back-feeds, disconnecting means, abnormal operating conditions, and power quality. This report provides a summary of mitigation strategies to minimize the impact of HPPV. Recommendations and revisions to the standards may take place as the penetration level of renewables on the grid increases and new technologies develop in future years.

  2. Career planning and development for nurses: the time has come.

    Science.gov (United States)

    Donner, G J; Wheeler, M M

    2001-06-01

    Developments in how the nursing profession is perceived by nurses and by society, along with unparalleled changes in health care systems, have created an environment in which individual nurses must take control of their careers and futures. Educators, employers and professional organizations also have a key role to play in fostering the career planning and development of nurses, usually the largest employee group in most health care organizations. This article provides an overview of what career planning and development is and why it is important for nurses. A career planning and development model is described that provides nurses with a focused strategy to take greater responsibility for engaging in the ongoing planning process that is crucial throughout the major stages of their career. Finally, educators, employers and professional organizations are challenged to collaborate with individual nurses on career-development activities that will enable nurses to continue to provide high-quality care in ever-changing health care systems.

  3. Smart city planning and development shortcomings

    Directory of Open Access Journals (Sweden)

    Margarita Angelidou

    2017-04-01

    Full Text Available This paper explores smart city planning and development shortcomings. In particular, it investigates eleven cases of smart city strategies and the shortcomings that were observed during their planning and implementation stages. The cases include: Barcelona Smart City, PlanlT Valley, Stockholm Smart City, Cyberjaya, King Abdullah Economic City, Masdar City, Skolkovo, Songdo International Business District, Chicago Smart City, Rio de Janeiro Smart City, and Konza Technology City. The paper proceeds with the synthesis of the findings and their critical appraisal. Shortcomings are classified into economic and budget shortages, bureaucratic and organizational challenges, challenges in the development and layout of digital services, poor physical planning, struggle to attract investment and support the development of new businesses, low performance in attracting and engaging users, and stakeholder resistance. In turn, the shortcomings are clustered in two distinct groups and analyzed in terms of causes and effects. The paper closes with mitigation propositions, accounting for past experience and novel approaches to this end.

  4. Treatment planning systems for high precision radiotherapy

    International Nuclear Information System (INIS)

    Deshpande, D.D.

    2008-01-01

    Computerized Treatment Planning System (TPS) play an important role in radiotherapy with the intent to maximize tumor control and minimize normal tissue complications. Treatment planning during earlier days was generally carried out through the manual summations of standard isodose charts on to patient body contours that were generated by direct tracing or lead wire representation, and relied heavily on the careful choices of beam weights and wedging. Since then there had been tremendous advances in field of Radiation Oncology in last few decades. The linear accelerators had evolved from MLC's to IGRT, the techniques like 3DCRT, IMRT has become almost routine affair. The simulation has seen transition from simple 2D film/fluoroscopy localization to CT Simulator with added development in PET, PET- CT and MR imaging. The Networking and advances in computer technology has made it possible to direct transfer of Images, contours to the treatment planning systems

  5. Global Nuclear Energy Partnership Technology Development Plan

    Energy Technology Data Exchange (ETDEWEB)

    David J. Hill

    2007-07-01

    This plan describes the GNEP Technology Demonstration Program (GNEP-TDP). It has been prepared to guide the development of integrated plans and budgets for realizing the domestic portion of the GNEP vision as well as providing the basis for developing international cooperation. Beginning with the GNEP overall goals, it describes the basic technical objectives for each element of the program, summarizes the technology status and identifies the areas of greatest technical risk. On this basis a proposed technology demonstration program is described that can deliver the required information for a Secretarial decision in the summer of 2008 and support construction of facilities.

  6. Regional Development Planning in the Slovak Republic

    Science.gov (United States)

    Rentková, Katarína

    2017-10-01

    Regional development is very closely related to a region and its competitive advantages which affect the competitiveness of the region. The regional development is influenced by many factors that act differently depending on the region. To ensure the effective and harmonized regional development, the systematic approach is needed. Every region is unique and differs from the other by the level of economic development, living standards of its inhabitants, unemployment rate and by employment possibilities. Regional policy is a strategic investment policy which focuses on all regions and cities in the European Union. The aim is to boost economic growth and to improve the quality of people’s lives. Solidarity is the main feature of the policy, because policy focuses on support for less developed regions. A fundamental aspect of regional development is to reduce disparities between the regions and cities. The paper focuses on the analysis of regional development of Slovakia. The intention is to follow the logical continuity of the article’s parts, the correctness and the adequacy of information and data. First part is focused on the definition of the regional policy and regional development. Important task is to identify the differences between European policies - regional, structural and cohesion policy. This section is prepared by using the analytical methods - the analysis, the casual and historical analysis. This part is based on literature review. The empirical part is based on statistics and secondary analysis which were aimed to analyse the regional development and effectiveness of its planning in the Slovak Republic. The question of this article is whether it is possible to plan the regional development by application of the plan for economic and social development, called the Municipal Development Plan.

  7. Development of an arid site closure plan

    International Nuclear Information System (INIS)

    Nyhan, J.W.; Barnes, F.J.

    1987-01-01

    This document describes the development of a prototype plan for the effective closure and stabilization of an arid low-level waste disposal site. This plan will provide demonstrated closure techniques for a trench in a disposal site at Los Alamos. The accuracy of modeling soil water storage by two hydrologic models, CREAMS and HELP, was tested by comparing simulation results with field measurements of soil moisture in eight experimental landfill cover systems having a range of well-defined soil profiles and vegetative covers. Regression analysis showed that CREAMS generally represented soil moisture more accurately than HELP simulations. Precautions for determining parameter values for model input and for interpreting simulation results are discussed. A specific example is presented showing how the field-validated hydrologic models can be used to develop a final prototype closure plan. 15 refs., 13 figs., 3 tabs

  8. A development strategy for the business plan of Mitsubishi Small-sized High Temperature Gas-cooled Modular Reactor (MHR-50/100is)

    International Nuclear Information System (INIS)

    Minatsuki, Isao; Otani, Tomomi; Shimizu, Katsusuke; Mizokami, Yorikata; Oyama, Sunao; Tsukamoto, Hiroki

    2014-01-01

    A business plan and a new concept of Mitsubishi Small-sized High Temperature Gas-cooled Modular Reactor (MHR-50/100is) has been investigated toward a commercialization in near future by Mitsubishi Heavy Industries cooperated with Japan Atomic Energy Agency (JAEA) in Japan. The potential market of small sized reactor is expected to increase from the points of view of smaller investment, industrial use of the nuclear heat and IPP (Independent Power Producer). Especially minimization of construction unit cost including R and D and plant construction period are important issues in order to realize a business plan for them. The study includes four pertinent subject areas of (1) a market analysis, (2) a conceptual design, (3) improvement of safety design and (4) plant dynamics. In summary, the MHR-50/100 is designed to target a short construction period, competitive cost, and an inherent safety feature while applying only the verified technology of the High Temperature Engineering Test Reactor (HTTR) of JAEA or conventional technologies

  9. A development strategy for the business plan of Mitsubishi Small-sized High Temperature Gas-cooled Modular Reactor (MHR-50/100is)

    Energy Technology Data Exchange (ETDEWEB)

    Minatsuki, Isao, E-mail: isao_minatsuki@mhi.co.jp [Mitsubishi Heavy Industries, Ltd., 16-5, Konan 2-Chome, Minato-ku, Tokyo (Japan); Otani, Tomomi; Shimizu, Katsusuke [Mitsubishi Heavy Industries, Ltd., 16-5, Konan 2-Chome, Minato-ku, Tokyo (Japan); Mizokami, Yorikata; Oyama, Sunao; Tsukamoto, Hiroki [Mitsubishi Heavy Industries, Ltd., 1-1 Wadasaki-cho 1-Chome, Hyogo-ku, Kobe (Japan)

    2014-05-01

    A business plan and a new concept of Mitsubishi Small-sized High Temperature Gas-cooled Modular Reactor (MHR-50/100is) has been investigated toward a commercialization in near future by Mitsubishi Heavy Industries cooperated with Japan Atomic Energy Agency (JAEA) in Japan. The potential market of small sized reactor is expected to increase from the points of view of smaller investment, industrial use of the nuclear heat and IPP (Independent Power Producer). Especially minimization of construction unit cost including R and D and plant construction period are important issues in order to realize a business plan for them. The study includes four pertinent subject areas of (1) a market analysis, (2) a conceptual design, (3) improvement of safety design and (4) plant dynamics. In summary, the MHR-50/100 is designed to target a short construction period, competitive cost, and an inherent safety feature while applying only the verified technology of the High Temperature Engineering Test Reactor (HTTR) of JAEA or conventional technologies.

  10. EMI Architecture and Technology Development Plan

    CERN Document Server

    Balazs, K.

    2013-01-01

    This document provides a brief overview of the EMI architecture and the technology development directions presented by the four EMI technology areas and by EMI partners. The report represents the final revision of EMI technology planning covering a time period beyond the project end.

  11. Employee Motivation for Personal Development Plan Effectiveness

    Science.gov (United States)

    Eisele, Lisa; Grohnert, Therese; Beausaert, Simon; Segers, Mien

    2013-01-01

    Purpose: This article aims to understand conditions under which personal development plans (PDPs) can effectively be implemented for professional learning. Both the organization's manner of supporting the PDP practice as well as the individual employee's motivation is taken into account. Design/ methodology/approach: A questionnaire was…

  12. Decentralized Development Planning and Fragmentation of ...

    African Journals Online (AJOL)

    Using the Greater Accra Metropolitan Area (GAMA) as a case study, this paper argues that the proliferation of autonomous local government areas within the context of urban sprawl and other challenges have inhibited metropolitan-wide development planning. Keywords: Decentralization; local government; urban growth; ...

  13. Plan Colombia or development as security

    Directory of Open Access Journals (Sweden)

    Juan Pablo Guevara Latorre

    2015-01-01

    the most relevant policy for the construction of the State in 21st-century Colombia from a critical standpoint. The document makes it possible to show that Plan Colombia is a privatized form of development, interpreted in terms of security based on an incomplete understanding of the Colombian conflict that prevails into our present

  14. tourists' preferences for ecotourism planning and development

    African Journals Online (AJOL)

    A literature review was adopted to better understand the key concepts related to tourist's ... and availability at Nyungwe Forest Lodge, Nyungwe tope View Hill Hotel, Gisakura .... A recent trail management plan for the park developed in 2012 suggested the .... marketing strategy to promote the tea tourism image in Rwanda.

  15. Tourists' preferences for ecotourism planning and development ...

    African Journals Online (AJOL)

    Tourists' preferences were: revising the price; improved product quality; creation of scenic viewpoints; improved service quality; improved infrastructure and information on the park as well. The study found that the park managers need to reconsider tourist's preferences while planning and developing ecotourism in Rwanda.

  16. ISV technology development plan for buried waste

    International Nuclear Information System (INIS)

    Nickelson, D.F.; Callow, R.A.; Luey, J.K.

    1992-07-01

    This report identifies the main technical issues facing the in situ vitrification (ISV) application to buried waste, and presents a plan showing the top-level schedule and projected resources needed to develop and demonstrate the technology for meeting Environmental Restoration Department (ERD) needs. The plan also proposes a model strategy for the technology transfer from the Department of Energy's Office of Technology Development (DOE-OTD) to the Office of Environmental Restoration (DOE-ER) as the technology proceeds from issues resolution (development) to demonstration and remedial readiness. Implementation of the plan would require $34,91 1K in total funding to be spread in the years FY-93 through FY-98. Of this amount, $10,183K is planned to be funded by DOE-OTD through the ISV Integrated Program. The remaining amount, $24,728K, is recommended to be split between the Department of Energy (DOE) Office of Technology Development ($6,670K) and DOE Office of Environmental Restoration ($18,058K)

  17. High performance computing and communications: FY 1996 implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-05-16

    The High Performance Computing and Communications (HPCC) Program was formally authorized by passage of the High Performance Computing Act of 1991, signed on December 9, 1991. Twelve federal agencies, in collaboration with scientists and managers from US industry, universities, and research laboratories, have developed the Program to meet the challenges of advancing computing and associated communications technologies and practices. This plan provides a detailed description of the agencies` HPCC implementation plans for FY 1995 and FY 1996. This Implementation Plan contains three additional sections. Section 3 provides an overview of the HPCC Program definition and organization. Section 4 contains a breakdown of the five major components of the HPCC Program, with an emphasis on the overall directions and milestones planned for each one. Section 5 provides a detailed look at HPCC Program activities within each agency.

  18. Developing and executing a strategic plan.

    Science.gov (United States)

    Morley, Glenn

    2010-02-01

    Because of the historic economic crisis, the past 18 months--2008 and the first half of 2009--have been challenging for many plastic surgery practices. Prior to the economic crisis in 2008, many practices enjoyed success with little synchronization between financial and productivity results, practice goals, and strategic planning. Now, suddenly, there is a great deal of interest in the alignment of budgets and financial reporting, marketing return on investment (ROI), staff accountability, and overhead management. The process of developing a business plan can serve to bring clarity and objectivity to the assessment of practice goals and market dynamics. The business planning process also provides assurance of more efficient use of the practice's human and capital resources. Ultimately, the process will bring order, discipline, and focus to practice stakeholders, thus increasing the likelihood of meeting or exceeding practice goals. The process: (1) defining the mission of the practice; (2) completing a competitive analysis for your market; (3) completing an assessment of your current environment; (4) completing an assessment of the financial health of your practice; (5) preparation of a SWOT (strengths, weakness, opportunity, threat) analysis; and (6) a translation of your mission statement into specific long-term goals and short-term performance objectives. The outcome of completing these tasks should be an actionable plan that will serve as a guide or road map for the practice. A well-articulated plan will solidify staff confidence, continue the advancement of a strong business foundation, and provide clear navigation through this new economic landscape in a way that preserves your ability to provide the care you have devoted yourselves to deliver. Today's needs, and yesterday's lessons, dictate that a well-documented strategic action plan be undertaken. Thieme Medical Publishers.

  19. Trinidad's mismatched expectations. Planning and development review.

    Science.gov (United States)

    Conway, D

    1984-11-01

    In 1974 petrodollars helped to boost living standards for many of the population of the Republic of Trinidad and Tobago. Yet, a failure to address the consequences of uncontrolled urbanization, especially in and around the capital, Port of Spain, threatens to undermine further improvements in the quality of Trinidadian life. Trinidad's urbanization has been associated with upward social mobility and a burgeoning middle class, such that social aspirations and spatial mobility tend to coincide. Thus, internal migration has involved a heterogeneous mixture of classes with the common denominator being a desire to improve one's standard of living. For most this means residence in or proximity to Port of Spain, the country's commercial, administrative, and cultural hub. Migration into and within Port of Spain and northwest corridors of West and East St. George County has contributed to several tricky problems, overwhelming regional planning efforts, inflating the costs of houses and land, and accelerating social alienation among urban Trinidadians. Problems could have been eased if government planning had given adequate recognition to spatial variations in societal organization, regional economic structures, and resource distribution. Trinidad changed markedly in the years 1974-81. New wealth has brought its own problems and old problems have worsened for lack of attention. The idea of decentralized growth poles at Sangre Grande, Point Fortin, La Brea, and Guayaguayare-Galeota now seems impossible to realize. The Capital region has for 10 years been absorbing a larger share of the population, now roughly half the total. It generates virtually all the island's employment opportunities and attracts the lion's share of private sector investment. Overcrowding in residences, unsanitary drainage, shortages of potable water, traffic congestion, and air pollution all have reduced the quality of life compared to 10 years ago. From 1974 onward the issue of economic development no

  20. Evidence development and publication planning: strategic process.

    Science.gov (United States)

    Wittek, Michael R; Jo Williams, Mary; Carlson, Angeline M

    2009-11-01

    A number of decisions in the health care field rely heavily on published clinical evidence. A systematic approach to evidence development and publication planning is required to develop a portfolio of evidence that includes at minimum information on efficacy, safety, durability of effect, quality of life, and economic outcomes. The approach requires a critical assessment of available literature, identification of gaps in the literature, and a strategic plan to fill the gaps to ensure the availability of evidence demanded for clinical decisions, coverage/payment decisions and health technology assessments. The purpose of this manuscript is to offer a six-step strategic process leading to a portfolio of evidence that meets the informational needs of providers, payers, and governmental agencies concerning patient access to a therapy.

  1. Surplus Highly Enriched Uranium Disposition Program plan

    International Nuclear Information System (INIS)

    1996-10-01

    The purpose of this document is to provide upper level guidance for the program that will downblend surplus highly enriched uranium for use as commercial nuclear reactor fuel or low-level radioactive waste. The intent of this document is to outline the overall mission and program objectives. The document is also intended to provide a general basis for integration of disposition efforts among all applicable sites. This plan provides background information, establishes the scope of disposition activities, provides an approach to the mission and objectives, identifies programmatic assumptions, defines major roles, provides summary level schedules and milestones, and addresses budget requirements

  2. A Quadrant Analysis on the Effectiveness of Planning and Control in Urban Housing Development in Selangor

    Directory of Open Access Journals (Sweden)

    Hamizah Yakob

    2016-01-01

    Full Text Available The current planning mechanisms which are development plan and planning control were recognised as important tools in housing planning process. However, the weaknesses involved in the preparation of development plans and its implementation through development control may impose constraints on housing development. The objective of this paper is to evaluate whether the housing planning and control activities practiced require improvement in terms of the level of effectiveness of its implementation by the LPAs and PCs in Selangor using Quadrant Analysis. It was found that three activities; location, compliance and difficulties need high attention to achieve effective housing planning control.

  3. Developing a strategic marketing plan for hospitals.

    Science.gov (United States)

    Dychtwald, K; Zitter, M

    1988-09-01

    The initial stages of developing a strategic marketing plan for hospitals are explored in this excerpt from the book, The Role of the Hospital in an Aging Society: A Blueprint for Action. The elderly have unique perceptual, cognitive, social, and psychological needs and preferences, and a marketing strategy for eldercare services must reflect these factors, as well as the financial role of third-party payers and the decision-making influence of families and physicians. Among the elements the hospital must address when developing a marketing strategy are market selection and segmentation, targeting markets with specific services, pricing, and positioning the hospital for a maximum share of the eldercare market.

  4. Technical plan for nondestructive examination technology development

    International Nuclear Information System (INIS)

    Anderson, B.C.

    1982-12-01

    This report provides a description of the development of the nondestructive examination (NDE) equipment to be used in the Stored Waste Examination Pilot Plant (SWEPP) for certifying transuranic (TRU) waste for shipment to the Waste Isolation Pilot Plant (WIPP). NDE equipment is being developed for waste identification and container integrity. Real-time x-ray radiography is the basic method being used for waste identification. Acoustic (ultrasonic) testing is being used to obtain measurements to verify container integrity. This report describes the decisions made to date, the decisions to be made, and the activities planned for FY 1983 through FY 1985

  5. Environmental Development Plan (EDP): space applications

    International Nuclear Information System (INIS)

    1978-04-01

    This Environmental Development Plan (EDP) identifies and examines the environmental, safety, health, and socioeconomic (ES and H) issues associated with the ongoing DOE Space Applications Program and the associated research, development, and demonstration programs. The EDP presents an ES and H research and development (R/D) program and strategy for timely resolutions of the issues and satisfaction of the associated requirements necessary for precluding impediments to the space nuclear systems technology. The EDP has been limited to the consideration of: (1) space nuclear power system nuclear fuel fabrication; (2) space nuclear power system heat source fabrication; (3) testing of subsystems and assembled systems; (4) R and D in support of space nuclear system development; (5) nuclear system responses to launch and reentry accidents; and (6) nuclear system environmental behavior and recovery

  6. KSC Education Technology Research and Development Plan

    Science.gov (United States)

    Odell, Michael R. L.

    2003-01-01

    Educational technology is facilitating new approaches to teaching and learning science, technology, engineering, and mathematics (STEM) education. Cognitive research is beginning to inform educators about how students learn providing a basis for design of more effective learning environments incorporating technology. At the same time, access to computers, the Internet and other technology tools are becoming common features in K-20 classrooms. Encouraged by these developments, STEM educators are transforming traditional STEM education into active learning environments that hold the promise of enhancing learning. This document illustrates the use of technology in STEM education today, identifies possible areas of development, links this development to the NASA Strategic Plan, and makes recommendations for the Kennedy Space Center (KSC) Education Office for consideration in the research, development, and design of new educational technologies and applications.

  7. Best practices in developing regional transportation plans

    Science.gov (United States)

    2001-08-01

    The purpose of this study is to compare Metropolitan Planning Organization (MPO) Regional Transportation Plans (RTP) and planning processes in California with selected regions. A total of 17 MPOs were included to provide a balance of geographic locat...

  8. Tunisia: high fertility stalls development.

    Science.gov (United States)

    Barberis, M

    1985-01-01

    Despite government policy enacted in 1964 to reduce fertility in order to hasten socioeconomic progress, population pressures continue to impair development in Tunisia. The birth rate fell 20% over the last 2 decades, but this accomplishment has been outweighed by a 50% decline in mortality rates. As a result, the rate of natural population increase has remained relatively constant at 2.5%/year. The initial decline in fertility that followed introduction of the national family planning program appears to have reached a plateau, explained in part by the resurgence of conservatism and religious fundamentalism and the consequent emphasis on women's childbearing roles. Unemployment in rural areas has led to widespread migration and unemployment is as high as 20% in the nonagricultural sector. Many young Tunisians lack adequate educational preparation to enter the labor force; in 1982, 27% of new job entrants could not read or write. The government's plan to decentralize development to stabilize population and achieve equilibrium between regions has been thwarted by the pace of population growth and limited resources. The rural regions where population is increasing the fastest are also the most difficult to reach with family planning programs. On the other hand, there have been some successes in this area when services have been adapted to the lifestyle and traditions of those in these isolated rural villages.

  9. Center Planning and Development Student Engineer

    Science.gov (United States)

    Jenkins, Kenneth T.

    2013-01-01

    This fall I was the Student Trainee (Engineering) Pathways Intern (co-op) at the Kennedy Space Center (KSC) in the Center Planning Development (CPD) Directorate. CPD works with commercial companies who are interested using KSCs unique capabilities in spaceflight, spacecraft processing, ground systems and Research Development (RD) projects that fall in line with NASAs mission and goals. CPD is divided into four (4) groups: (1) AD-A, which works on the Master Planning for center, (2) AD-B (where I am), which works on project management and integration, (3) AD-C, which works on partnership development, and (4) AD-T, which works on the RD aspects of partnerships. CPDs main goal is to one day make KSC the worlds largest spaceport and maintain the center as a leader in space exploration. CPD is a very diverse group with employees having a wide knowledge of not only the Space Shuttle, but also that of the Apollo era. Our director of CPD, Scott Colloredo, is on the advisory board for Commercial Space Operations (CSO) and has a degree at ERAU. I worked on a number of different tasks for AD-B, as well as CPD, that includes, but not limited to: reviewing and reissuing engineering drawings from the Apollo and Shuttle eras, to supporting NASA rocket launches (MAVEN), and working on actual agreementsproposals that will be used in the partnership process with multiple partners. Most of the work I have done is sensitive information and cannot be disclosed.

  10. Standard Review Plan Update and Development Program

    International Nuclear Information System (INIS)

    1992-05-01

    This implementing procedures document (IPD) was prepared for use in implementing tasks under the standard review plan update and development program (SRP-UDP). The IPD provides comprehensive guidance and detailed procedures for SRP-UDP tasks. The IPD is mandatory for contractors performing work for the SRP-UDP. It is guidance for the staff. At the completion of the SRP-UDP, the IPD will be revised (to remove the UDP aspects) and will replace NRR Office Letter No. 800 as long-term maintenance procedures

  11. Standard Review Plan Update and Development Program

    Energy Technology Data Exchange (ETDEWEB)

    1992-05-01

    This implementing procedures document (IPD) was prepared for use in implementing tasks under the standard review plan update and development program (SRP-UDP). The IPD provides comprehensive guidance and detailed procedures for SRP-UDP tasks. The IPD is mandatory for contractors performing work for the SRP-UDP. It is guidance for the staff. At the completion of the SRP-UDP, the IPD will be revised (to remove the UDP aspects) and will replace NRR Office Letter No. 800 as long-term maintenance procedures.

  12. Enviromental Development Plan: special nuclear materials production

    International Nuclear Information System (INIS)

    1980-07-01

    This Environmental Development Plan includes the process steps and facilities necessary for the production of plutonium and tritium for Government needs and the production of some other radioactive materials that will be used for heat and radiation sources by domestic and international customers. The production reactors and the spent fuel processing plants and their effluents are discussed, but the defense wastes from them are treated in a separate EDP. The scope does not include transportation, decontamination and decommissioning, safeguards and security, or use of the SNM products

  13. Nuclear program of Iran plans and development

    International Nuclear Information System (INIS)

    2016-01-01

    Described are the history of nuclear energy planning in Iran and the development of the Bushehr Nuclear Power Plant (BNPP-1) project and its impact on the competency building in national companies, nuclear safety infrastructure, training activities, public awareness and acceptance. The activities of Nuclear Engineering Department is also presented. In order to enhance technical support services to BNPP1 and also to use capabilities of other companies in the international arena and in line with safe and reliable operation of Bushehr Nuclear Power Plant, NPPD/TAVANA Company has attempted to make contact with many companies outside the country

  14. Plutonium Focus Area research and development plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-11-01

    The Department of Energy (DOE) committed to a research and development program to support the technology needs for converting and stabilizing its nuclear materials for safe storage. The R and D Plan addresses five of the six material categories from the 94-1 Implementation Plan: plutonium (Pu) solutions, plutonium metals and oxides, plutonium residues, highly enriched uranium, and special isotopes. R and D efforts related to spent nuclear fuel (SNF) stabilization were specifically excluded from this plan. This updated plan has narrowed the focus to more effectively target specific problem areas by incorporating results form trade studies. Specifically, the trade studies involved salt; ash; sand, slag, and crucible (SS and C); combustibles; and scrub alloy. The plan anticipates possible disposition paths for nuclear materials and identifies resulting research requirements. These requirements may change as disposition paths become more certain. Thus, this plan represents a snapshot of the current progress and will continue to be updated on a regular basis. The paper discusses progress in safeguards and security, plutonium stabilization, special isotopes stabilization, highly-enriched uranium stabilization--MSRE remediation project, storage technologies, engineered systems, core technology, and proposed DOE/Russian technology exchange projects.

  15. Plutonium Focus Area research and development plan. Revision 1

    International Nuclear Information System (INIS)

    1996-11-01

    The Department of Energy (DOE) committed to a research and development program to support the technology needs for converting and stabilizing its nuclear materials for safe storage. The R and D Plan addresses five of the six material categories from the 94-1 Implementation Plan: plutonium (Pu) solutions, plutonium metals and oxides, plutonium residues, highly enriched uranium, and special isotopes. R and D efforts related to spent nuclear fuel (SNF) stabilization were specifically excluded from this plan. This updated plan has narrowed the focus to more effectively target specific problem areas by incorporating results form trade studies. Specifically, the trade studies involved salt; ash; sand, slag, and crucible (SS and C); combustibles; and scrub alloy. The plan anticipates possible disposition paths for nuclear materials and identifies resulting research requirements. These requirements may change as disposition paths become more certain. Thus, this plan represents a snapshot of the current progress and will continue to be updated on a regular basis. The paper discusses progress in safeguards and security, plutonium stabilization, special isotopes stabilization, highly-enriched uranium stabilization--MSRE remediation project, storage technologies, engineered systems, core technology, and proposed DOE/Russian technology exchange projects

  16. High performance computing and communications: FY 1995 implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-04-01

    The High Performance Computing and Communications (HPCC) Program was formally established following passage of the High Performance Computing Act of 1991 signed on December 9, 1991. Ten federal agencies in collaboration with scientists and managers from US industry, universities, and laboratories have developed the HPCC Program to meet the challenges of advancing computing and associated communications technologies and practices. This plan provides a detailed description of the agencies` HPCC implementation plans for FY 1994 and FY 1995. This Implementation Plan contains three additional sections. Section 3 provides an overview of the HPCC Program definition and organization. Section 4 contains a breakdown of the five major components of the HPCC Program, with an emphasis on the overall directions and milestones planned for each one. Section 5 provides a detailed look at HPCC Program activities within each agency. Although the Department of Education is an official HPCC agency, its current funding and reporting of crosscut activities goes through the Committee on Education and Health Resources, not the HPCC Program. For this reason the Implementation Plan covers nine HPCC agencies.

  17. Initial planning of monorail development in Medan

    Science.gov (United States)

    Surbakti, M. S.

    2018-03-01

    Medan City is the third largest city in Indonesia after Jakarta and Surabaya. With a total area of 265.10 km2 and a population of 2.1 million people, it is proper that Medan City has operated a mass transportation system, which can accommodate the needs of the city movement. The current transportation system is dominated by a paratransit that has a capacity of 12 passengers. In fact, the data released by Ditlantas Poldasu and the Department of Transportation of Medan City shows that in 2013 the total number of passenger vehicles is 408,877 units, 99% of which are private vehicles, and there are only 1580 public transport. Planning the bus as a public transportation system in the city of Medan who tried to integrate it with the surrounding cities until now has not been done. One of the problems is the overlap of the bus route with existing public transport routes. This raises resistance from organda as an association of public transport operators located in the city of Medan. Bappeda Medan City in the Year 2014 has done the initial planning of monorail development in Medan City. The results of the study show that economically monorail development is feasible to be implemented and does not compete directly with the existing public transport system. This happens because 90% of monorail routes are in median ring road Medan City, which predicted the next 20 years will experience a large loading.

  18. Strategic Planning for New Presidents: Developing an Entrance Plan

    Science.gov (United States)

    Garza Mitchell, Regina L.; Maldonado, Cesar

    2015-01-01

    Community colleges are greatly impacted by turbulent external forces while also experiencing turnover in the topmost leadership positions. New presidents must learn how to lead an institution while also planning for purposeful change that will allow the college to thrive. In this article, the authors propose a method for new presidents to develop…

  19. Fly-by-light flight control system technology development plan

    Science.gov (United States)

    Chakravarty, A.; Berwick, J. W.; Griffith, D. M.; Marston, S. E.; Norton, R. L.

    1990-01-01

    The results of a four-month, phased effort to develop a Fly-by-Light Technology Development Plan are documented. The technical shortfalls for each phase were identified and a development plan to bridge the technical gap was developed. The production configuration was defined for a 757-type airplane, but it is suggested that the demonstration flight be conducted on the NASA Transport Systems Research Vehicle. The modifications required and verification and validation issues are delineated in this report. A detailed schedule for the phased introduction of fly-by-light system components has been generated. It is concluded that a fiber-optics program would contribute significantly toward developing the required state of readiness that will make a fly-by-light control system not only cost effective but reliable without mitigating the weight and high-energy radio frequency related benefits.

  20. Multiyear Program Plan for the High Temperature Materials Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Arvid E. Pasto

    2000-03-17

    Recently, the U.S. Department of Energy's (DOE) Office of Heavy Vehicle Technologies (OHVT) prepared a Technology Roadmap describing the challenges facing development of higher fuel efficiency, less polluting sport utility vehicles, vans, and commercial trucks. Based on this roadmap, a multiyear program plan (MYPP) was also developed, in which approaches to solving the numerous challenges are enumerated. Additional planning has been performed by DOE and national laboratory staff, on approaches to solving the numerous challenges faced by heavy vehicle system improvements. Workshops and planning documents have been developed concerning advanced aerodynamics, frictional and other parasitic losses, and thermal management. Similarly, the Heavy Vehicle Propulsion Materials Program has developed its own multiyear program plan. The High Temperature Materials Laboratory, a major user facility sponsored by OHVT, has now developed its program plan, described herein. Information was gathered via participation in the development of OHVT's overall Technology Roadmap and MYPP, through personal contacts within the materials-user community, and from attendance at conferences and expositions. Major materials issues for the heavy vehicle industry currently center on trying to increase efficiency of (diesel) engines while at the same time reducing emissions (particularly NO{sub x} and particulates). These requirements dictate the use of increasingly stronger, higher-temperature capable and more corrosion-resistant materials of construction, as well as advanced catalysts, particulate traps, and other pollution-control devices. Exhaust gas recirculation (EGR) is a technique which will certainly be applied to diesel engines in the near future, and its use represents a formidable challenge, as will be described later. Energy-efficient, low cost materials processing methods and surface treatments to improve wear, fracture, and corrosion resistance are also required.

  1. Multiyear Program Plan for the High Temperature Materials Laboratory; FINAL

    International Nuclear Information System (INIS)

    Arvid E. Pasto

    2000-01-01

    Recently, the U.S. Department of Energy's (DOE) Office of Heavy Vehicle Technologies (OHVT) prepared a Technology Roadmap describing the challenges facing development of higher fuel efficiency, less polluting sport utility vehicles, vans, and commercial trucks. Based on this roadmap, a multiyear program plan (MYPP) was also developed, in which approaches to solving the numerous challenges are enumerated. Additional planning has been performed by DOE and national laboratory staff, on approaches to solving the numerous challenges faced by heavy vehicle system improvements. Workshops and planning documents have been developed concerning advanced aerodynamics, frictional and other parasitic losses, and thermal management. Similarly, the Heavy Vehicle Propulsion Materials Program has developed its own multiyear program plan. The High Temperature Materials Laboratory, a major user facility sponsored by OHVT, has now developed its program plan, described herein. Information was gathered via participation in the development of OHVT's overall Technology Roadmap and MYPP, through personal contacts within the materials-user community, and from attendance at conferences and expositions. Major materials issues for the heavy vehicle industry currently center on trying to increase efficiency of (diesel) engines while at the same time reducing emissions (particularly NO(sub x) and particulates). These requirements dictate the use of increasingly stronger, higher-temperature capable and more corrosion-resistant materials of construction, as well as advanced catalysts, particulate traps, and other pollution-control devices. Exhaust gas recirculation (EGR) is a technique which will certainly be applied to diesel engines in the near future, and its use represents a formidable challenge, as will be described later. Energy-efficient, low cost materials processing methods and surface treatments to improve wear, fracture, and corrosion resistance are also required

  2. Airport Capital Improvement Planning: Stewardship for Airport Development

    Science.gov (United States)

    1997-09-01

    "Airport Capital Improvement Planning: Stewardship for Airport Development", was : originally written in October, 1995. It documented an effort to implement the : concept of capital improvement planning with the airport development industry. : Airpor...

  3. Volcanic Eruption: Students Develop a Contingency Plan

    Science.gov (United States)

    Meisinger, Philipp; Wittlich, Christian

    2013-04-01

    , causing a blockage and afflux of the Rhine, which, due to the given conditions of a very narrow valley, would lead to excessive flooding affecting even the greater Rhine-Main-region. Not to mention the consequences of a pyroclastic flow, dropping volcanic bombs and further hazardous/disastrous consequences. In comparison to other "potentially active" or "active volcanoes", e.g. the Vesuvius, the Laacher See is scarcely monitored and according to recent publications poorly analyzed in terms of contingency and evacuation plans. This offers space for critical analysis and creative solutions to an existing problem. Short: We need geographers and their knowledge to provide help. Given these facts, the Laacher See could be the layout for a very interesting geography project bringing together previously gained knowledge and understanding of volcanic activities, their destructive powers, consequences and risks in case of an eruption in combination with their topographical characteristics. Your students thereby act the role of a geoscientist developing contingency plans and evacuation zones for the greater Laacher See area. This involves a detailed analysis of the topographical characteristics based on (classic) topographic maps or online via the use of a GIS (e.g. Google maps). In a second step students enlist the possible consequences they already know according to their range and copy them onto a transparency layer on the topographic map. Using such a layer technique students add population density, important topographic features and maybe even anticipated wind directions to their map. The information density and the specific layout of this map are thereby only determined by the student's previous knowledge, their personal abilities and skills and the amount of time provided. This offers the opportunities to even differentiate the task within your group and provide support adjusted to the individual students level. On the basis of their own thematic map your students should be

  4. 1989 basic plan for atomic energy development and utilization

    International Nuclear Information System (INIS)

    1989-01-01

    A Basic Plan for Atomic Energy Development and Utilization has been established each year based on the guidelines set up by the Atomic Energy Commission of Japan, with the aim of promoting the development and utilization of atomic energy schematically and efficiently. The Basic Plan shows specific projects to achieve the objectives specified in the Long-Range Plan for Atomic Energy Development and Utilization. The Basic Plan specifies efforts to be made for overall strengthening of safety measures (safety policies, safety research, disaster prevention, etc.), promotion of nuclear power generation, establishment of the nuclear fuel cycle (securing of uranium, technology for uranium enrichment, reprocessing, etc.), development of new types of power reactors (fast breeder reactor, new types of converter reactors, plutonium fuel processing technology), promotion of leading projects (nuclear fusion, utilization of radiations, atomic powered ships, high-temperature engineering tests), promotion of basic technology development (basic research, training of scientists and engineers), voluntary and active international activities (international cooperation), and acquisition of understanding and cooperation of the general public. (N,K.)

  5. Development of Consistency between Marketing and Planning.

    Science.gov (United States)

    Williford, A. Michael

    1986-01-01

    Examined descriptive information about marketing, enrollment management, institutional planning and factors affecting them. A factor analysis of statistically appropriate variables identified factors associated with a state of symbiosis between marketing and institutional planning. (Author/BL)

  6. Spent nuclear fuel project high-level information management plan

    Energy Technology Data Exchange (ETDEWEB)

    Main, G.C.

    1996-09-13

    This document presents the results of the Spent Nuclear Fuel Project (SNFP) Information Management Planning Project (IMPP), a short-term project that identified information management (IM) issues and opportunities within the SNFP and outlined a high-level plan to address them. This high-level plan for the SNMFP IM focuses on specific examples from within the SNFP. The plan`s recommendations can be characterized in several ways. Some recommendations address specific challenges that the SNFP faces. Others form the basis for making smooth transitions in several important IM areas. Still others identify areas where further study and planning are indicated. The team`s knowledge of developments in the IM industry and at the Hanford Site were crucial in deciding where to recommend that the SNFP act and where they should wait for Site plans to be made. Because of the fast pace of the SNFP and demands on SNFP staff, input and interaction were primarily between the IMPP team and members of the SNFP Information Management Steering Committee (IMSC). Key input to the IMPP came from a workshop where IMSC members and their delegates developed a set of draft IM principles. These principles, described in Section 2, became the foundation for the recommendations found in the transition plan outlined in Section 5. Availability of SNFP staff was limited, so project documents were used as a basis for much of the work. The team, realizing that the status of the project and the environment are continually changing, tried to keep abreast of major developments since those documents were generated. To the extent possible, the information contained in this document is current as of the end of fiscal year (FY) 1995. Programs and organizations on the Hanford Site as a whole are trying to maximize their return on IM investments. They are coordinating IM activities and trying to leverage existing capabilities. However, the SNFP cannot just rely on Sitewide activities to meet its IM requirements

  7. Software Development Plan for DESCARTES and CIDER

    International Nuclear Information System (INIS)

    Eslinger, P.W.

    1992-01-01

    This Software Development Plan (SDP) outlines all software activities required to obtain functional environmental accumulation and individual dose codes for the Hanford Environmental Dose Reconstruction (HEDR) project. The modeling activities addressed use the output of the air transport-code HATCHET to compute radionuclide concentrations in environmental pathways, and continue on through calculations of dose for individuals. The Hanford Environmental Dose Reconstruction (HEDR) Project has a deliverable in the June 1993 time frame to be able to start computing doses to individuals from nuclear-related activities on the Hanford Site during and following World War II. The CIDER code will compute doses and their uncertainties for individuals living in the contaminated environment computed by DESCARTES. The projected size of the code is 3000 lines

  8. Planning for Development in the Arab Gulf States: A content Analysis of Current Development Plans

    DEFF Research Database (Denmark)

    Hvidt, Martin

    2012-01-01

    Abstract: This paper analyses current development plans published by the GCC states (Bahrain, Kuwait, Oman, Qatar, Saudi Arabia, and the United Arab Emirates) in order to explore the region’s future growth trajectory: what barriers to growth are foreseen and how can they be anticipated; what...

  9. 7 CFR 22.306 - Financing rural development planning.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 1 2010-01-01 2010-01-01 false Financing rural development planning. 22.306 Section... Responsibilities of State Governments § 22.306 Financing rural development planning. States will be required to finance rural development planning through their own resources, revenue-sharing allocations, or the...

  10. Neutral-beam development plan, FY 1982-1987

    International Nuclear Information System (INIS)

    1981-09-01

    The following chapters are included: (1) status of BNL negative ion source development, (2) source development program plan, (3) status of beam transport and acceleration, (4) accelerator development program plan, (5) neutralizer concepts, (6) neutralization program plan, (7) neutral beam systems, (8) test facilities, (9) program milestones and time schedules, (10) organization and Grumman participation, and (11) funding tables

  11. Development of Consensus Treatment Plans for Juvenile Localized Scleroderma

    Science.gov (United States)

    Li, Suzanne C.; Torok, Kathryn S.; Pope, Elena; Dedeoglu, Fatma; Hong, Sandy; Jacobe, Heidi T.; Rabinovich, C. Egla; Laxer, Ronald M.; Higgins, Gloria C.; Ferguson, Polly J.; Lasky, Andrew; Baszis, Kevin; Becker, Mara; Campillo, Sarah; Cartwright, Victoria; Cidon, Michael; Inman, Christi J; Jerath, Rita; O'Neil, Kathleen M.; Vora, Sheetal; Zeft, Andrew; Wallace, Carol A.; Ilowite, Norman T.; Fuhlbrigge, Robert C

    2013-01-01

    Objective To develop standardized treatment plans, clinical assessments, and response criteria for active, moderate to high severity juvenile localized scleroderma (jLS). Background jLS is a chronic inflammatory skin disorder associated with substantial morbidity and disability. Although a wide range of therapeutic strategies have been reported in the literature, a lack of agreement on treatment specifics and accepted methods for clinical assessment of have made it difficult to compare approaches and identify optimal therapy. Methods A core group of pediatric rheumatologists, dermatologists and a lay advisor was engaged by the Childhood Arthritis and Rheumatology Research Alliance (CARRA) to develop standardized treatment plans and assessment parameters for jLS using consensus methods/nominal group techniques. Recommendations were validated in two face-to-face conferences with a larger group of practitioners with expertise in jLS and with the full membership of CARRA, which encompasses the majority of pediatric rheumatologists in the U.S and Canada. Results Consensus was achieved on standardized treatment plans that reflect the prevailing treatment practices of CARRA members. Standardized clinical assessment methods and provisional treatment response criteria were also developed. Greater than 90% of pediatric rheumatologists responding to a survey (67% of CARRA membership) affirmed the final recommendations and agreed to utilize these consensus plans to treat patients with jLS. Conclusions Using consensus methodology, we have developed standardized treatment plans and assessment methods for jLS. The high level of support among pediatric rheumatologists will support future comparative effectiveness studies and enable the development of evidence-based guidelines for the treatment of jLS. PMID:22505322

  12. 75 FR 80850 - Development of Strategic Plan 2011-2015

    Science.gov (United States)

    2010-12-23

    ... intended for use as LSC embarks on its planning process. LSC anticipates publishing a draft Strategic Plan... process to develop a Strategic Plan for the years 2011-2015. Toward that end, LSC is soliciting... strategic planning efforts. In addition, Among other sources, LSC is considering the guidance provided by...

  13. National spatial development planning in South Africa 1930-2010 ...

    African Journals Online (AJOL)

    National spatial development planning in South Africa 1930-2010: An introductory comparative analysis. ... Town and Regional Planning ... It demonstrates that, despite the ostensible support for national planning during this period, such plans and proposals rarely had a direct impact on the conduct of government business.

  14. Consistency and Reconciliation Model In Regional Development Planning

    Directory of Open Access Journals (Sweden)

    Dina Suryawati

    2016-10-01

    Full Text Available The aim of this study was to identify the problems and determine the conceptual model of regional development planning. Regional development planning is a systemic, complex and unstructured process. Therefore, this study used soft systems methodology to outline unstructured issues with a structured approach. The conceptual models that were successfully constructed in this study are a model of consistency and a model of reconciliation. Regional development planning is a process that is well-integrated with central planning and inter-regional planning documents. Integration and consistency of regional planning documents are very important in order to achieve the development goals that have been set. On the other hand, the process of development planning in the region involves technocratic system, that is, both top-down and bottom-up system of participation. Both must be balanced, do not overlap and do not dominate each other. regional, development, planning, consistency, reconciliation

  15. Development Application - Terra Nova Development - Canada-Newfoundland Benefits Plan

    International Nuclear Information System (INIS)

    1996-01-01

    The Canada-Newfoundland Benefits Plan, part of the overall application to develop the Terra Nova Field off the coast of Newfoundland details the benefits to Canadians, but most particularly to residents of Newfoundland and Labrador that a vibrant petroleum industry is expected to bring. In this document the proponents commit themselves to a course of action designed to enhance the opportunities for Canadian and Newfoundland participation in the development, in accordance with the Atlantic Accord legislation. In terms of this legislation, the project proponents are obliged to perform development functions from Newfoundland, acquire goods and services for the Terra Nova Development on a 'best value' basis, but consistent with the procurement policies and procedures for benefits. The proponents must consider Canadian and, in particular, Newfoundland benefits as one of the factors in the procurement of goods and services, and require contactors and subcontractors to adhere to the development's benefits principles, objectives and commitments. A 7-page glossary is also included

  16. Planning and Enacting Mathematical Tasks of High Cognitive Demand in the Primary Classroom

    Science.gov (United States)

    Georgius, Kelly

    2013-01-01

    This study offers an examination of two primary-grades teachers as they learn to transfer knowledge from professional development into their classrooms. I engaged in planning sessions with each teacher to help plan tasks of high cognitive demand, including anticipating and planning for classroom discourse that would occur around the task. A…

  17. IT Strategic Planning Workshops Develop Long-Term Goals | Poster

    Science.gov (United States)

    As part of NCI’s Research IT Strategic Planning efforts, a workshop was held on the NIH main campus in June. The main purpose of the workshop was to discuss ways to better integrate IT and informatics throughout NCI, and develop specific, high-level goals and related objectives that will drive the direction of IT and informatics support over the next five years. The initiative

  18. Radioisotope thermoelectric generator transportation system subsystem 143 software development plan

    International Nuclear Information System (INIS)

    King, D.A.

    1994-01-01

    This plan describes the activities to be performed and the controls to be applied to the process of specifying, developing, and qualifying the data acquisition software for the Radioisotope Thermoelectric Generator (RTG) Transportation System Subsystem 143 Instrumentation and Data Acquisition System (IDAS). This plan will serve as a software quality assurance plan, a verification and validation (V and V) plan, and a configuration management plan

  19. Developing a revenue integrity improvement plan.

    Science.gov (United States)

    Banks, Kate

    2010-11-01

    A revenue integrity plan should address five key areas: Accuracy of patient information. Verification of payer information and policies. Accuracy of documentation. Processing of claims. Accuracy of payment.

  20. A High-Speed Train Operation Plan Inspection Simulation Model

    Directory of Open Access Journals (Sweden)

    Yang Rui

    2018-01-01

    Full Text Available We developed a train operation simulation tool to inspect a train operation plan. In applying an improved Petri Net, the train was regarded as a token, and the line and station were regarded as places, respectively, in accordance with the high-speed train operation characteristics and network function. Location change and running information transfer of the high-speed train were realized by customizing a variety of transitions. The model was built based on the concept of component combination, considering the random disturbance in the process of train running. The simulation framework can be generated quickly and the system operation can be completed according to the different test requirements and the required network data. We tested the simulation tool when used for the real-world Wuhan to Guangzhou high-speed line. The results showed that the proposed model can be developed, the simulation results basically coincide with the objective reality, and it can not only test the feasibility of the high-speed train operation plan, but also be used as a support model to develop the simulation platform with more capabilities.

  1. Planning for Interagency Cooperation in Rural Development. CARD Report 45.

    Science.gov (United States)

    Rogers, David L.; Glick, Edward L.

    With a major emphasis on cooperative planning in rural development, three elements of development process were identified: (1) integration of units involved, occurring when several organizations contribute to a larger collective effort; (2) decentralized planning and local initiative, occurring when planning initiative is at the local level; (3)…

  2. Chemical sensors technology development planning workshop

    Energy Technology Data Exchange (ETDEWEB)

    Bastiaans, G.J.; Haas, W.J. Jr.; Junk, G.A. [eds.

    1993-03-01

    The workshop participants were asked to: (1) Assess the current capabilities of chemical sensor technologies for addressing US Department of Energy (DOE) Environmental Restoration and Waste Management (EM) needs; (2) Estimate potential near term (one to two years) and intermediate term (three to five years) capabilities for addressing those needs; and (3) Generate a ranked list of specific recommendations on what research and development (R&D) should be funded to provide the necessary capabilities. The needs were described in terms of two pervasive EM problems, the in situ determination of chlorinated volatile organic compounds (VOCs), and selected metals in various matrices at DOE sites. The R&D recommendations were to be ranked according to the estimated likelihood that the product technology will be ready for application within the time frame it is needed and the estimated return on investment. The principal conclusions and recommendations of the workshop are as follows: Chemical sensors capable of in situ determinations can significantly reduce analytical costs; Chemical sensors have been developed for certain VOCs in gases and water but none are currently capable of in situ determination of VOCs in soils; The DOE need for in situ determination of metals in soils cannot be addressed with existing chemical sensors and the prospects for their availability in three to five years are uncertain; Adaptation, if necessary, and field application of laboratory analytical instruments and those few chemical sensors that are already in field testing is the best approach for the near term; The chemical sensor technology development plan should include balanced support for near- and intermediate-term efforts.

  3. Chemical sensors technology development planning workshop

    International Nuclear Information System (INIS)

    Bastiaans, G.J.; Haas, W.J. Jr.; Junk, G.A.

    1993-03-01

    The workshop participants were asked to: (1) Assess the current capabilities of chemical sensor technologies for addressing US Department of Energy (DOE) Environmental Restoration and Waste Management (EM) needs; (2) Estimate potential near term (one to two years) and intermediate term (three to five years) capabilities for addressing those needs; and (3) Generate a ranked list of specific recommendations on what research and development (R ampersand D) should be funded to provide the necessary capabilities. The needs were described in terms of two pervasive EM problems, the in situ determination of chlorinated volatile organic compounds (VOCs), and selected metals in various matrices at DOE sites. The R ampersand D recommendations were to be ranked according to the estimated likelihood that the product technology will be ready for application within the time frame it is needed and the estimated return on investment. The principal conclusions and recommendations of the workshop are as follows: Chemical sensors capable of in situ determinations can significantly reduce analytical costs; Chemical sensors have been developed for certain VOCs in gases and water but none are currently capable of in situ determination of VOCs in soils; The DOE need for in situ determination of metals in soils cannot be addressed with existing chemical sensors and the prospects for their availability in three to five years are uncertain; Adaptation, if necessary, and field application of laboratory analytical instruments and those few chemical sensors that are already in field testing is the best approach for the near term; The chemical sensor technology development plan should include balanced support for near- and intermediate-term efforts

  4. Developing Strategic Planning for the Retail Market.

    Science.gov (United States)

    Greenawalt, Richard A.

    1983-01-01

    Retailers need a strategic plan that will enable them to adapt to changing trends and work with new ideas. Questions retailers should ask to shape the strategic plan and generic strategies--overall cost leadership, differentiation, and marketing to a particular group or offering a special service--are discussed. (SR)

  5. Developing an interdisciplinary certificate program in transportation planning.

    Science.gov (United States)

    2010-09-01

    This project develops and implements a graduate certificate in transportation planning. Texas A&M : University (A&M) currently offers instruction in transportation through its Master of Urban Planning (MUP) : and Civil Engineering (CE) programs; howe...

  6. GSG-GIS development program plan

    International Nuclear Information System (INIS)

    Lee, R.C.

    1992-01-01

    For the past 40 years, the Savannah River Site (SRS) has been subjected to numerous geological and geotechnical investigations in support of facility construction and waste site development and remediation. Over this period,.a variety of different subcontractors have collected large quantities of geoscience data. In addition, current programs involve numerous investigators from different departments, and consequently, earth science data and interpretations are scattered among the departments, investigators, and subcontractors at SRS. As a result, scientific and management decisions cannot take advantage of the significant body of information that exists at SRS. Recent DOE Orders (Systematic Evaluation Program, 1991) have put specific requirements on their contractors to compile geological databases to coordinate DOE site data gathering and interpretations, and to assist in compiling safety analysis reports. The Earth Science Advisory Committee and the Environmental Advisory Committee have also made specific recommendations on the management of SRS geoscience data. This plan describes a management system to identify, communicate, and compile SRS geological (including geohydrologic), seismological, and geotechnical (656) data and interpretations on a Geographic Information System (GIS)

  7. Legal consequences of the special development plan 'power plant sites' on regional planning and on guidelines for building plans

    International Nuclear Information System (INIS)

    1978-01-01

    The Special Development Plan 'Power plant sites' was made compulsory by the regulation given by the Land government in Juli 1976. For extending the energy supply system this Special Development Plan intends to provide a sufficient amount of power plant sites suitably located with regard to present and future consumption centres and permitting a cooling by means of river water while safeguarding the interests of water resources policy. The Special Development Plan established in accordance with the articles 25 and 27 of the planning law of the Land lays down that 14 specified areas are to be kept free from utilization purposes which could be opposed to the realization of power plant projects. Thus the securing of these (potential) sites has become an objective of area planning and planning of the Land in the sense of article 5 paragraph 4 of the Federal law on area planning. (orig./HP) [de

  8. Ten-Year Network Development Plan - 2015 edition, executive summary

    International Nuclear Information System (INIS)

    2016-01-01

    Complying with the European and French laws, each year, RTE prepares and publicizes a Ten-Year Network Development Plan (NDP) to meet the expectations of its stakeholders and customers. The NDP lists the network development projects that RTE plans to complete and commission over a 3-year period and presents the main power transmission infrastructure work envisaged for the next Ten-years. Beyond, it outlines the possible network adaptation needs for a variety of energy transition scenarios. Over the next 10 years, the network investments will make it possible to: - Meet the goals of the Regional Climate Air Energy Plans, - Create 4 GW of extra offshore wind generation integration capacity and 10 GW of additional interconnection capacity, 2/3 more than the current capacity, - Enable the development of economically and demographically dynamic areas, with safe and high-standard electricity supply. In the coming decade, RTE plans: - 1,200 km of new underground and sub-sea DC links, along with their associated converter stations; - 600 km of existing equipment upgrades or new overhead 400 kV AC circuits substituting existing power lines. - and, at the same time, nearly 900 km of underground lines and just over 400 km of overhead 225 kV AC lines should be built. 400 projects are listed in this NDP: - 21% of the operations are on overhead lines (for 3/4 new lines or upgrade and for 1/4 dismantling of existing assets) - 27% concern new underground lines; - 52% on substation adaptations (about 20 new RTE substations and 100 new customer substations connected). Globally, nearly 80% of the network is developed underground or sub-sea. This edition of the Network Development plan is further enriched. In particular, it explains more thoroughly the link between the integration of renewable energy and the entailed development of the transmission network. It also provides a focus on smart grids. This edition relies on mid and long term scenarios describing the evolution of the

  9. Participation in planning – A study of urban development in Norway

    Directory of Open Access Journals (Sweden)

    Eva Irene Falleth

    2011-08-01

    Full Text Available In Norway, the dominance of neo-liberal ideas has resulted in a private planning practice whereby the developer is the principal actor in opaque negotiations between planning authorities and developers. We examine patterns of contact between stakeholders in urban development planning. Based on information obtained from a survey of the 145 most populous municipalities in Norway, as well as from case studies in Oslo, Bergen and Trondheim, we find considerable interaction between the stakeholders involved in the planning process. The interaction patterns are different for civil society actors and private developers. We find that while developers have contacts with the planning authorities, the civil actors have contacts with the politicians. In the initial phase, i.e. before formal planning begins, this pattern is highly significant. Politicians frequently feel bound by negotiations and agreements that are made by the planners and the developers during the initial planning process.

  10. Planning for transit-supportive development : a practitioner's guide. Section 4 : corridor planning and transit-supportive development.

    Science.gov (United States)

    2014-06-01

    Planning for Transit-Supportive Development: A Practitioners Guide is a toolkit of practical and innovative measures to help : Metropolitan Planning Organizations (MPOs), regional planners, transit agencies, and local government elected o...

  11. Planning for transit-supportive development : a practitioner's guide. Section 5 : local planning and transit-supportive development.

    Science.gov (United States)

    2014-06-01

    Planning for Transit-Supportive Development: A Practitioners Guide is a toolkit of practical and innovative measures to help : Metropolitan Planning Organizations (MPOs), regional planners, transit agencies, and local government elected o...

  12. Planning for transit-supportive development : a practitioner's guide. Section 2 : general transit-supportive development planning topics.

    Science.gov (United States)

    2014-06-01

    Planning for Transit-Supportive Development: A Practitioners Guide is a toolkit of practical and innovative measures to help : Metropolitan Planning Organizations (MPOs), regional planners, transit agencies, and local government elected o...

  13. The developing rural electrification plan continues

    International Nuclear Information System (INIS)

    Martinez, Veronica

    2001-01-01

    The article overviews the current situation of the rural electrification in Guatemala, including demand and supply of energy and the plans of the government in covering the rural areas through the promotion of renewable energy sources

  14. Issues in regional planning and development in Nigeria

    Directory of Open Access Journals (Sweden)

    Oladayo Ramon Ibrahim

    2017-10-01

    Full Text Available Till date,Nigeria can not boast of a specific, well-formulated, clear regional development policy framework despite several urban planning, development and governance initiatives including passage of regulations at both federal and state government levels that have been undertaken since independence by successive post- colonial governments. Most of the country's claims of regional development are products of other policies, and intentions, which do not have any bearing on, deliberate regional planning policies. Policy and decision-making on development planning often do not incorporate the implications of the ways in which we use land and the consequences for different places (economic planning. The neglect of place, in particular, the way that different policies combine to affect places in different ways (regional planning, has contributed to a range of negative economic, social and environmental outcomes. This paper relies mainly on the secondary data and literature exploration to demonstrate that the little role accorded to spatial planning, especially, regional planning, in the development efforts is largely responsible for the underdevelopment, imbalance, and inequalities in the country, as well as poverty of the citizens. The conclusion of the paper is that regional planning should be an integral part and complementary to economic planning in the national development planning of the country. For regional planning to aid in the development of the country and promote the well-being of the citizens, appropriate recommendations have been included in the paper.

  15. Treatment planning for radiotherapy with very high-energy electron beams and comparison of VHEE and VMAT plans

    International Nuclear Information System (INIS)

    Bazalova-Carter, Magdalena; Qu, Bradley; Palma, Bianey; Jensen, Christopher; Maxim, Peter G.; Loo, Billy W.; Hårdemark, Björn; Hynning, Elin

    2015-01-01

    Purpose: The aim of this work was to develop a treatment planning workflow for rapid radiotherapy delivered with very high-energy electron (VHEE) scanning pencil beams of 60–120 MeV and to study VHEE plans as a function of VHEE treatment parameters. Additionally, VHEE plans were compared to clinical state-of-the-art volumetric modulated arc therapy (VMAT) photon plans for three cases. Methods: VHEE radiotherapy treatment planning was performed by linking EGSnrc Monte Carlo (MC) dose calculations with inverse treatment planning in a research version of RayStation. In order to study the effect of VHEE treatment parameters on VHEE dose distributions, a MATLAB graphical user interface (GUI) for calculation of VHEE MC pencil beam doses was developed. Through the GUI, pediatric case MC simulations were run for a number of beam energies (60, 80, 100, and 120 MeV), number of beams (13, 17, and 36), pencil beam spot (0.1, 1.0, and 3.0 mm) and grid (2.0, 2.5, and 3.5 mm) sizes, and source-to-axis distance, SAD (40 and 50 cm). VHEE plans for the pediatric case calculated with the different treatment parameters were optimized and compared. Furthermore, 100 MeV VHEE plans for the pediatric case, a lung, and a prostate case were calculated and compared to the clinically delivered VMAT plans. All plans were normalized such that the 100% isodose line covered 95% of the target volume. Results: VHEE beam energy had the largest effect on the quality of dose distributions of the pediatric case. For the same target dose, the mean doses to organs at risk (OARs) decreased by 5%–16% when planned with 100 MeV compared to 60 MeV, but there was no further improvement in the 120 MeV plan. VHEE plans calculated with 36 beams outperformed plans calculated with 13 and 17 beams, but to a more modest degree (<8%). While pencil beam spacing and SAD had a small effect on VHEE dose distributions, 0.1–3 mm pencil beam sizes resulted in identical dose distributions. For the 100 MeV VHEE pediatric

  16. Intelligent Tools for Planning Knowledge base Development and Verification

    Science.gov (United States)

    Chien, Steve A.

    1996-01-01

    A key obstacle hampering fielding of AI planning applications is the considerable expense of developing, verifying, updating, and maintaining the planning knowledge base (KB). Planning systems must be able to compare favorably in terms of software lifecycle costs to other means of automation such as scripts or rule-based expert systems.

  17. 44 CFR 78.5 - Flood Mitigation Plan development.

    Science.gov (United States)

    2010-10-01

    ... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Flood Mitigation Plan..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78.5 Flood Mitigation Plan development. A Flood Mitigation Plan will articulate a...

  18. United States Air Force Summer Research Program -- 1991. High School Apprenticeship Program (HSAP) Reports, Volume 12: Rome Laboratory, Arnold Engineering Development Plan

    Science.gov (United States)

    1991-12-01

    convenient document retrieval and internal voice communications system. 12-12 AFOSR High School Apprenticeship Program July 22-August 16 1991 Gene ...with the computer software packages used here at Sverdrup; Gene Smith and Gail Arnold for their aid in faxing my pay voucher every two weeks. GENERAL...10M .,.n Z~ w z .; z z ZZ r3r M z X E X 2 z Y ZiMZ . Z Z Z Z X2X Z X Z X 2 rZ Z Z W: I. I 1 It W6 hfe II 1 - -- m _ V m-! ’ =t2Csu C1 M 0 oNt - ;I

  19. Development of competences from the viewpoint of career planning

    OpenAIRE

    Adomaitienė, Jūratė; Zubrickienė, Ilona

    2011-01-01

    The paper attempts to reveal the essence of the process of career perspective planning, highlight the aspect of dynamism of modern career competence by showing the importance of its continuous development and the significance for career perspective planning. The analysis reveals the approach of teachers and lecturers towards own career competence, its development and importance for planning of own career perspective; towards reflection as the basic quality of own career development, while pla...

  20. Control System Development Plan for the National Spherical Torus Experiment

    International Nuclear Information System (INIS)

    Neumeyer, C.; Mueller, D.; Gates, D.A.; Ferron, J.R.

    1999-01-01

    The National Spherical Torus Experiment (NSTX) has as one of its primary goals the demonstration of the attractiveness of the spherical torus concept as a fusion power plant. Central to this goal is the achievement of high plasma β ( = 2 micro 0 /B 2 a measure of the efficiency of a magnetic plasma confinement system). It has been demonstrated both theoretically and experimentally that the maximum achievable β is a strong function of both local and global plasma parameters. It is therefore important to optimize control of the plasma. To this end a phased development plan for digital plasma control on NSTX is presented. The relative level of sophistication of the control system software and hardware will be increased according to the demands of the experimental program in a three phase plan. During Day 0 (first plasma), a simple coil current control algorithm will initiate plasma operations. During the second phase (Day 1) of plasma operations the control system will continue to use the preprogrammed algorithm to initiate plasma breakdown but will then change over to a rudimentary plasma control scheme based on linear combinations of measured plasma fields and fluxes. The third phase of NSTX plasma control system development will utilize the rtEFIT code, first used on DIII-D, to determine, in real-time, the full plasma equilibrium by inverting the Grad-Shafranov equation. The details of the development plan, including a description of the proposed hardware will be presented

  1. High performance computing and communications: FY 1997 implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-01

    The High Performance Computing and Communications (HPCC) Program was formally authorized by passage, with bipartisan support, of the High-Performance Computing Act of 1991, signed on December 9, 1991. The original Program, in which eight Federal agencies participated, has now grown to twelve agencies. This Plan provides a detailed description of the agencies` FY 1996 HPCC accomplishments and FY 1997 HPCC plans. Section 3 of this Plan provides an overview of the HPCC Program. Section 4 contains more detailed definitions of the Program Component Areas, with an emphasis on the overall directions and milestones planned for each PCA. Appendix A provides a detailed look at HPCC Program activities within each agency.

  2. Developing a Business Plan for Critical Care Pharmacy Services.

    Science.gov (United States)

    Erstad, Brian L; Mann, Henry J; Weber, Robert J

    2016-11-01

    Critical care medicine has grown from a small group of physicians participating in patient care rounds in surgical and medical intensive care units (ICUs) to a highly technical, interdisciplinary team. Pharmacy's growth in the area of critical care is as exponential. Today's ICU requires a comprehensive pharmaceutical service that includes both operational and clinical services to meet patient medication needs. This article provides the elements for a business plan to justify critical care pharmacy services by describing the pertinent background and benefit of ICU pharmacy services, detailing a current assessment of ICU pharmacy services, listing the essential ICU pharmacy services, describing service metrics, and delineating an appropriate timeline for implementing an ICU pharmacy service. The structure and approach of this business plan can be applied to a variety of pharmacy services. By following the format and information listed in this article, the pharmacy director can move closer to developing patient-centered pharmacy services for ICU patients.

  3. Environmental Development Plan for advanced isotope separation

    International Nuclear Information System (INIS)

    1979-05-01

    This EDP identifies the planning and management requirements and schedules needed to evaluate and assess the environmental, health, and safety aspects of the Advanced Isotope Separation (AIS) program. Current AIS processes include the molecular and atomic vapor laser processes and the plasma process. This document covers the technology program, environmental concerns and requirements, and environmental strategy

  4. Nondestructive examination development and demonstration plan

    International Nuclear Information System (INIS)

    Weber, J.R.

    1991-01-01

    Nondestructive examination (NDE) of waste matrices using penetrating radiation is by nature very subjective. Two candidate systems of examination have been identified for use in WRAP 1. This test plan describes a method for a comparative evaluation of different x-ray examination systems and techniques

  5. Organisational Problems in Planning Educational Development.

    Science.gov (United States)

    Organisation for Economic Cooperation and Development, Paris (France). Directorate for Scientific Affairs.

    Papers submitted to a meeting of economists, educators, and government officials discuss the organizational implications of the link between education and economic growth. Following an introduction by Henning Friis, the authors and titles of the papers are (1) Necat Erder, "Some Administrative Problems in Educational Planning," (2) Raymond…

  6. IT Strategic Planning Workshops Develop Long-Term Goals | Poster

    Science.gov (United States)

    As part of NCI’s Research IT Strategic Planning efforts, a workshop was held on the NIH main campus in June. The main purpose of the workshop was to discuss ways to better integrate IT and informatics throughout NCI, and develop specific, high-level goals and related objectives that will drive the direction of IT and informatics support over the next five years. The initiative to integrate NCI’s IT and informatics is a collaboration between the Center for Biomedical Informatics and Information Technology (CBIIT), Office of Scientific Operations, Data Management Services, and the IT Operations Group.

  7. Tenneessee Valley Authority office of nuclear power management development plan

    International Nuclear Information System (INIS)

    Clements, L.L.

    1985-01-01

    The Tennessee Valley Authority's Management Development Plan is discussed and consists of an analysis of each managerial position, an analysis of each individual manager's and potential manager's qualifications and training and a comparison of the two. From this comparison two products are derived: a management replacement plan and an individual development plan for each nuclear employee. The process of the program is described in detail

  8. Turnaround Operations Analysis for OTV. Volume 3: Technology Development Plan

    Science.gov (United States)

    1988-01-01

    An integrated technology development plan for the technologies required to process both GBOTVs and SBOTVs are described. The plan includes definition of the tests and experiments to be accomplished on the ground, in a Space Shuttle Sortie Mission, on an Expendable Launch Vehicle, or at the Space Station as a Technology Development Mission (TDM). The plan reflects and accommodates current and projected research and technology programs where appropriate.

  9. 76 FR 14025 - Guidance for Industry on Planning for the Effects of High Absenteeism To Ensure Availability of...

    Science.gov (United States)

    2011-03-15

    ...] Guidance for Industry on Planning for the Effects of High Absenteeism To Ensure Availability of Medically... entitled ``Planning for the Effects of High Absenteeism to Ensure Availability of Medically Necessary Drug... components to develop production plans in the event of an emergency that results in high absenteeism at one...

  10. Productivity Research and Development Planning Workshop.

    Science.gov (United States)

    1986-03-01

    mission. These ideas must come from everyone in all echelons of the Comand. The MAC quality of worklife efforts consist of quality circles, labor-manage...that would not have been captured by the measure as initially formulated by the PIG. The balance of the plan and recommenda- tions made by the PMWG...people are doing things. We have the suggestion program, the quality of worklife program, and the Tech Mod program. All of these programs are productivity

  11. Integrated planning: A baseline development perspective

    International Nuclear Information System (INIS)

    Clauss, L.; Chang, D.

    1994-01-01

    The FEMP Baseline establishes the basis for integrating environmental activity technical requirements with their cost and schedule elements. The result is a path forward to successfully achieving the FERMCO mission. Specific to cost management, the FEMP Baseline has been incorporate into the FERMCO Project Control System (PCS) to provide a time-phased budget plan against which contractor performance is measured with an earned value management system. The result is the Performance Measurement Baseline (PMB), an important tool for keeping cost under control

  12. High frequency system project implementation plan

    International Nuclear Information System (INIS)

    Moon, L.L.

    1976-01-01

    The High Frequency System is a new mobile, digital diagnostic recording system for use at the Nevada Test Site. Many different kinds of event data will be digitized in real-time by this system, and these data will be recorded and stored for later read-out and transmission to NADCEN. The hardware and software requirements of the High Frequency System are examined, and the parameters of the system are proposed

  13. Development and Reliability of the Comprehensive Crisis Plan Checklist

    Science.gov (United States)

    Aspiranti, Kathleen B.; Pelchar, Taylor K.; McCLeary, Daniel F.; Bain, Sherry K.; Foster, Lisa N.

    2011-01-01

    It is of vital importance that children are educated in a safe environment. Every school needs to have a well-developed crisis management document containing plans for prevention, intervention, and postvention. We developed the Comprehensive Crisis Plan Checklist (CCPC) to serve as a valuable tool that can be used to assist practitioners with…

  14. Increasing Organizational Effectiveness through Better Human Resource Planning and Development

    Science.gov (United States)

    Schein, Edgar H.

    1977-01-01

    Discusses the increasing importance of human resource planning and development for organizational effectiveness, and examines how the major components of a human resource planning and development system should be coordinated for maximum effectiveness. Available from Alfred P. Sloan School of Management, Massachusetts Institute of Technology,…

  15. Demographic, Employment and Development Trends: The Need for Integrated Planning.

    Science.gov (United States)

    Farooq, Ghazi M.; MacKellar, F. Landis

    1990-01-01

    The authors contend that problems associated with rapid population growth in developing countries must be tackled through comprehensive planning. They discuss impacts of demography on labor supply and demand and migration. Then they propose a practical framework for population and human resource development planning and policy formation. (SK)

  16. Integrated development and testing plan for the plutonium immobilization project

    International Nuclear Information System (INIS)

    Kan, T.

    1998-01-01

    This integrated plan for the DOE Office of Fissile Materials Disposition (MD) describes the technology development and major project activities necessary to support the deployment of the immobilization approach for disposition of surplus weapons-usable plutonium. The plan describes details of the development and testing (D and T) tasks needed to provide technical data for design and operation of a plutonium immobilization plant based on the ceramic can-in-canister technology (''Immobilization Fissile Material Disposition Program Final Immobilization Form Assessment and Recommendation'', UCRL-ID-128705, October 3, 1997). The plan also presents tasks for characterization and performance testing of the immobilization form to support a repository licensing application and to develop the basis for repository acceptance of the plutonium form. Essential elements of the plant project (design, construction, facility activation, etc.) are described, but not developed in detail, to indicate how the D and T results tie into the overall plant project. Given the importance of repository acceptance, specific activities to be conducted by the Office of Civilian Radioactive Waste Management (RW) to incorporate the plutonium form in the repository licensing application are provided in this document, together with a summary of how immobilization D and T activities provide input to the license activity. The ultimate goal of the Immobilization Project is to develop, construct, and operate facilities that will immobilize from about 18 to 50 tonnes (MT) of U.S. surplus weapons usable plutonium materials in a manner that meets the ''spent fuel'' standard (Fissile Materials Storage and Disposition Programmatic Environmental Impact Statement Record of Decision, ''Storage and Disposition Final PEIS'', issued January 14, 1997, 62 Federal Register 3014) and is acceptable for disposal in a geologic repository. In the can-in-canister technology, this is accomplished by encapsulating the

  17. Federal Plan for High-End Computing

    Data.gov (United States)

    Networking and Information Technology Research and Development, Executive Office of the President — Since the World War II era, when scientists, mathematicians, and engineers began using revolutionary electronic machinery that could rapidly perform complex...

  18. Developing and assessing accident management plans for nuclear power plants

    International Nuclear Information System (INIS)

    Hanson, D.J.; Johnson, S.P.; Blackman, H.S.; Stewart, M.A.

    1992-07-01

    This document is the second of a two-volume NUREG/CR that discusses development of accident management plans for nuclear power plants. The first volume (a) describes a four-phase approach for developing criteria that could be used for assessing the adequacy of accident management plans, (b) identifies the general attributes of accident management plans (Phase 1), (c) presents a prototype process for developing and implementing severe accident management plans (Phase 2), and (d) presents criteria that can be used to assess the adequacy of accident management plans. This volume (a) describes results from an evaluation of the capabilities of the prototype process to produce an accident management plan (Phase 3) and (b), based on these results and preliminary criteria included in NUREG/CR-5543, presents modifications to the criteria where appropriate

  19. IDC Re-Engineering Phase 3 Development Plan.

    Energy Technology Data Exchange (ETDEWEB)

    Harris, James M. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Burns, John F. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Pollock, David L. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-01-01

    Sandia National Laboratories has prepared a project development plan that proposes how the parties interested in the IDC Re-Engineering system will coordinate its development, testing and transition to operations.

  20. 2016 Federal Cybersecurity Research and Development Strategic Plan

    Data.gov (United States)

    Networking and Information Technology Research and Development, Executive Office of the President — As part of the Presidents Cybersecurity National Action Plan (CNAP), the Administration released the 2016 Federal Cybersecurity Research and Development Strategic...

  1. Regional planning and urban infrastructure development in the ...

    African Journals Online (AJOL)

    Regional planning and urban infrastructure development in the Gongola region, ... PROMOTING ACCESS TO AFRICAN RESEARCH ... In North-eastern Nigeria, the Gongola region has been one of the least developed since independence.

  2. Plan of promotion and development of unconventional renewable sources

    International Nuclear Information System (INIS)

    Rojas M, Jose Rodrigo

    2016-01-01

    The plan for the promotion and development of unconventional sources renewable energies developed by the Instituto Costarricense de Electricidad is explained. The percentage data from the use of unconventional renewable sources for power generation in Costa Rica is presented [es

  3. Development of a computerized handbook of architectural plans

    NARCIS (Netherlands)

    Koutamanis, A.

    1990-01-01

    The dissertation investigates an approach to the development of visual / spatial computer representations for architectural purposes through the development of the computerized handbook of architectural plans (chap), a knowledge-based computer system capable of recognizing the metric properties of

  4. IDC Re-Engineering Phase 3 Development Plan

    International Nuclear Information System (INIS)

    Harris, James M.; Burns, John F.; Pollock, David L.

    2017-01-01

    Sandia National Laboratories has prepared a project development plan that proposes how the parties interested in the IDC Re-Engineering system will coordinate its development, testing and transition to operations.

  5. The Federal Big Data Research and Development Strategic Plan

    Data.gov (United States)

    Networking and Information Technology Research and Development, Executive Office of the President — Summary: This Plan is an important milestone in the Administrations Big Data Research and Development (R&D) Initiative

  6. TRAC code development status and plans

    International Nuclear Information System (INIS)

    Spore, J.W.; Liles, D.R.; Nelson, R.A.

    1986-01-01

    This report summarizes the characteristics and current status of the TRAC-PF1/MOD1 computer code. Recent error corrections and user-convenience features are described, and several user enhancements are identified. Current plans for the release of the TRAC-PF1/MOD2 computer code and some preliminary MOD2 results are presented. This new version of the TRAC code implements stability-enhancing two-step numerics into the 3-D vessel, using partial vectorization to obtain a code that has run 400% faster than the MOD1 code

  7. Planning for shallow high resolution seismic surveys

    CSIR Research Space (South Africa)

    Fourie, CJS

    2008-11-01

    Full Text Available of the input wave. This information can be used in conjunction with this spreadsheet to aid the geophysicist in designing shallow high resolution seismic surveys to achieve maximum resolution and penetration. This Excel spreadsheet is available free from...

  8. Planning Innovation and Regional Development: the Spreading of Urban Strategic Planning in Southern Italy

    OpenAIRE

    Vinci, Ignazio

    2011-01-01

    For decades the Italian system of planning has been strongly characterized by a regulatory approach and the question of cities' development had been taken into account within general land use plans. In the 1990s this approach has been considered a strong constraint on the regeneration of cities and the revitalization of their economic potential. Therefore, in the last decade the improvement of flexibility and participation within planning processes were considered primary objectives both at r...

  9. Developing a strategic human resources plan for the Urban Angel.

    Science.gov (United States)

    Owen, Susan M

    2011-01-01

    In healthcare a significant portion of the budget is related to human resources. However, many healthcare organizations have yet to develop and implement a focused organizational strategy that ensures all human resources are managed in a way that best supports the successful achievement of corporate strategies. St. Michael's Hospital, in Toronto, Ontario, recognized the benefits of a strategic human resources management plan. During an eight-month planning process, St. Michael's Hospital undertook the planning for and development of a strategic human resources management plan. Key learnings are outlined in this paper.

  10. Ensuring Sustainable Development through Urban Planning in Pakistan

    Directory of Open Access Journals (Sweden)

    Mohammad Qasim

    2013-04-01

    Full Text Available Urban planning includes land use management and environmental change. It makes arrangement for community facilities and services. Since, sustainable development has been included as a vital end product of all planning goals it also provides for balanced use of land, housing and transportation and better quality of life. Present urban planning in Pakistan is not ensuring sustainable development in Pakistan. This is tested through the case study of master planning in Rawalpindi and its implementation through housing schemes in Rawalpindi, Pakistan. Large portions of provisions of master plans are not implemented. This paper explains how the urban planning will be made enabled to ensure sustainable development in Pakistan. Six numbers of housing schemes and two squatter settlements have been surveyed through questionnaires, secondary data, the opinions of the experts from related fields and site observations. Amenities and social services at far distance, very less green area, Less quantity and bad quality of water, absence of comprehensive solid waste management and sewage disposal system and nontreatment of solid waste, effluent and sewage, prevalent unhygienic conditions and air and water pollution are the existing factors effecting the sustainability. There is a need to revisit the urban planning and a comprehensive Urban and Environment Planning Law at national level and at provincial level is recommended to enable the urban planning to ensure the sustainable development in Pakistan

  11. Planning and developing the French nuclear programme

    International Nuclear Information System (INIS)

    Carle, R.

    1983-01-01

    Since France has been compelled to free itself from the domination of oil, it has undertaken a nuclear programme capable of providing for nearly one third of its energy needs by 1990. Some years after the first oil crisis, a good part of the battle has already been won: 22 reactor units of 900 MW each have been connected to the grid and account for 40% of the electricity produced in France, while 12 other 900 MW units, together with the first 1300 MW units, are under construction. Nuclear power has thus become an industrial reality possessed of the tools appropriate for the whole fuel cycle, which has managed to cope with costs and meet deadlines, and has developed a safe and reliable product. With these positive results despite inevitable incidents the French nuclear industry has come of age. There are, however, handicaps which remain to be overcome: high investment costs, operating constraints and continuing doubt on the part of the public. The efforts deployed in these three spheres are beginning to bear fruit. As a result, implementation of the French nuclear programme is being continued, albeit at a slower rate, for the aim is no longer to replace oil by nuclear power as soon as possible, but rather to keep up with the rise in consumption. In pursuing its nuclear efforts, France will henceforth be stressing progress in terms of quality, which can still be achieved in terms of increased reliability (incorporation of feedback), better economic return (initiation of a new series known as ''N4''), easier operation (improvement of the man-machine interface) and also more independence. The ''frenchification'' of the light-water reactor has from the beginning been seen as one of the means of achieving this independence. This also applies to mastery of the whole fuel cycle. And finally, fast breeders represent the next stage

  12. A ten-step process to develop case management plans.

    Science.gov (United States)

    Tahan, Hussein A

    2002-01-01

    The use of case management plans has contained cost and improved quality of care successfully. However, the process of developing these plans remains a great challenge for healthcare executives, in this article, the author presents the answer to this challenge by discussing a 10-step formal process that administrators of patient care services and case managers can adapt to their institutions. It also can be used by interdisciplinary team members as a practical guide to develop a specific case management plan. This process is applicable to any care setting (acute, ambulatory, long term, and home care), diagnosis, or procedure. It is particularly important for those organizations that currently do not have a deliberate and systematic process to develop case management plans and are struggling with how to improve the efficiency and productivity of interdisciplinary teams charged with developing case management plans.

  13. Planning Considerations for Afterschool Professional Development

    Science.gov (United States)

    Bradshaw, L. Daniele

    2015-01-01

    Professional development is vital to the success of afterschool programs. Effective professional development enhances afterschool program quality by facilitating staff performance and knowledge; in addition, professional development is vital for improving student learning outcomes (Bouffard & Little, 2004; Hall & Surr, 2005; Joyce &…

  14. Planning Cultures and Histories: Influences on the Evolution of Planning Systems and Spatial Development Patterns

    NARCIS (Netherlands)

    Stead, D.; de Vries, J.; Tasan-Kok, T.

    2015-01-01

    This special issue addresses the influences of planning cultures and histories on the evolution of planning systems and spatial development. As well as providing an international comparative perspective on these issues, the collection of articles also engages in a search for new conceptual

  15. THE COMMUNITY PLANNING PROCESS. KANSAS STATE UNIVERSITY SHORT COURSE SERIES ON COMMUNITY PLANNING AND DEVELOPMENT, 6.

    Science.gov (United States)

    WEISENBURGER, RAY B.

    PART OF A KANSAS STATE UNIVERSITY SERIES ON COMMUNITY PLANNING AND DEVELOPMENT, THIS MONOGRAPH DISCUSSES THE STAGES IN THE PREPARATION AND IMPLEMENTATION OF COMPREHENSIVE URBAN SCHEMES. FIRST OF ALL, SOCIAL ACCEPTANCE, ECONOMIC, FEASIBILITY, POLITICAL RESPONSIBILITY, AND ENVIRONMENTAL SATISFACTION ARE VITAL TO SUCCESSFUL PLANNING. ORGANIZATION FOR…

  16. Research and development plan for the Slagging Pyrolysis Incinerator

    International Nuclear Information System (INIS)

    Hedahl, T.G.; McCormack, M.D.

    1979-01-01

    Objective is to develop an incinerator for processing disposed transuranium waste. This R and D plan describes the R and D efforts required to begin conceptual design of the Slagging Pyrolysis Incinerator (Andco-Torrax). The program includes: incinerator, off-gas treatment, waste handling, instrumentation, immobilization analyses, migration studies, regulations, Belgium R and D test plan, Disney World test plan, and remote operation and maintenance

  17. Environmental Development Plan: uranium mining, milling, and conversion

    International Nuclear Information System (INIS)

    1979-08-01

    This Environmental Development Plan (EDP) identifies the planning and management requirements and schedules needed to evaluate and assess the environmental, health, and safety (EH and S) aspects of the uranium mining, milling, and conversion technologies. The plan represents the collective perceptions of EH and S concerns and requirements and knowledge of ongoing research programs of most of the Federal agencies involved in significant EH and S R and D program management, standards setting, or regulatory activities associated with uranium mining, milling, and conversion

  18. Developing cancer control plans in Africa: examples from five countries.

    Science.gov (United States)

    Stefan, Daniela Cristina; Elzawawy, Ahmed M; Khaled, Hussein M; Ntaganda, Fabien; Asiimwe, Anita; Addai, Beatrice Wiafe; Wiafe, Seth; Adewole, Isaac F

    2013-04-01

    The creation and implementation of national cancer control plans is becoming increasingly necessary for countries in Africa, with the number of new cancer cases per year in the continent expected to reach up to 1·5 million by 2020. Examples from South Africa, Egypt, Nigeria, Ghana, and Rwanda describe the state of national cancer control plans and their implementation. Whereas in Rwanda the emphasis is on development of basic facilities needed for cancer care, in those countries with more developed economies, such as South Africa and Nigeria, the political will to fund national cancer control plans is limited, even though the plans exist and are otherwise well conceived. Improved awareness of the increasing burden of cancer and increased advocacy are needed to put pressure on governments to develop, fund, and implement national cancer control plans across the continent. Copyright © 2013 Elsevier Ltd. All rights reserved.

  19. High Luminosity LHC: challenges and plans

    Science.gov (United States)

    Arduini, G.; Barranco, J.; Bertarelli, A.; Biancacci, N.; Bruce, R.; Brüning, O.; Buffat, X.; Cai, Y.; Carver, L. R.; Fartoukh, S.; Giovannozzi, M.; Iadarola, G.; Li, K.; Lechner, A.; Medina Medrano, L.; Métral, E.; Nosochkov, Y.; Papaphilippou, Y.; Pellegrini, D.; Pieloni, T.; Qiang, J.; Redaelli, S.; Romano, A.; Rossi, L.; Rumolo, G.; Salvant, B.; Schenk, M.; Tambasco, C.; Tomás, R.; Valishev, S.; Van der Veken, F. F.

    2016-12-01

    The Large Hadron Collider (LHC) is one of the largest scientific instruments ever built. Since opening up a new energy frontier for exploration in 2010, it has gathered a global user community working in fundamental particle physics and the physics of hadronic matter at extreme temperature and density. To sustain and extend its discovery potential, the LHC will undergo a major upgrade in the 2020s. This will increase its rate of collisions by a factor of five beyond the original design value and the integrated luminosity by a factor ten. The new configuration, known as High Luminosity LHC (HL-LHC), will rely on a number of key innovations that push accelerator technology beyond its present limits. Among these are cutting-edge 11-12 T superconducting magnets, including Nb3Sn-based magnets never used in accelerators before, compact superconducting cavities for longitudinal beam rotation, new technology and physical processes for beam collimation. The dynamics of the HL-LHC beams will be also particularly challenging and this aspect is the main focus of this paper.

  20. High Luminosity LHC: Challenges and plans

    International Nuclear Information System (INIS)

    Arduini, G.; Barranco, J.; Bertarelli, A.; Biancacci, N.; Bruce, R.

    2016-01-01

    The Large Hadron Collider (LHC) is one of the largest scientific instruments ever built. Since opening up a new energy frontier for exploration in 2010, it has gathered a global user community working in fundamental particle physics and the physics of hadronic matter at extreme temperature and density. To sustain and extend its discovery potential, the LHC will undergo a major upgrade in the 2020s. This will increase its rate of collisions by a factor of five beyond the original design value and the integrated luminosity by a factor ten. The new configuration, known as High Luminosity LHC (HL-LHC), will rely on a number of key innovations that push accelerator technology beyond its present limits. Among these are cutting-edge 11–12 T superconducting magnets, including Nb 3 Sn-based magnets never used in accelerators before, compact superconducting cavities for longitudinal beam rotation, new technology and physical processes for beam collimation. As a result, the dynamics of the HL-LHC beams will be also particularly challenging and this aspect is the main focus of this paper.

  1. Developing a regional energy plan for two counties in Ireland

    DEFF Research Database (Denmark)

    Connolly, David; Mathiesen, Brian Vad; Lund, Henrik

    2011-01-01

    Developing a sustainable energy supply will most likely require a transition from large-scale centralised plants to decentralised distributed generation. Consequently, local planning authorities will play a more important role in energy planning in the coming years, as more decentralised energy f...

  2. Succession, Development and Innovation of the Master Plan of Beijing

    Institute of Scientific and Technical Information of China (English)

    2006-01-01

    <正> The Master Plan of Beijing (2004 - 2020),approved in January 2005 by the State Council, is an important strategic, holistic and comprehensive plan for Beijing to face the new century, to realize the stra-tegic proposition of"New Beijing, Great Olympics", and to fully push forward the harmonious and sustainable development of economy, society, population, resources and environment.

  3. Development of Secondary Route Bridge Design Plan Guides

    Science.gov (United States)

    2018-03-03

    The objective of this study is to develop a set of bridge plan guides for low-volume traffic roads. The purpose of the plans is to facilitate construction of new structures suitable for local agencies. The designs are to specifically address common l...

  4. The Strategic Plan and Local Economic Development of Cordoba, Argentina

    NARCIS (Netherlands)

    R. Vanella (Ricardo); C. Lucca (Carlos); J.R. Pittari (Jorge Romero); F. Steinberg (Florian); Zwanenburg Maria Zwanenburg (M.)

    2001-01-01

    textabstractThe Strategic Plan of Cordoba (SPC) is one of the few strategic urban development plans in Latin America, which has actually been implemented in the majority of its components. The SPC was conceived as a collective and global project of the city as a whole without excessive conflicting

  5. The Place of Education in Manpower Planning in Developing Countries

    Science.gov (United States)

    Fapohunda, Olanrewaju J.

    1974-01-01

    Defines manpower planning and outlines its objectives, describes the effects of education on economic growth in developing countries, and discusses problems of education in manpower planning: questions of the source of education, the content, and the percentage of the population ot be educated at a given time. Important political limitations are…

  6. Salt repository sealing materials development program: 5-year work plan

    International Nuclear Information System (INIS)

    Myers, L.B.

    1986-06-01

    This plan covers 5 years (fiscal years 1986 through 1990) of work in the repository sealing materials program to support design decisions and licensing activities for a salt repository. The plan covers a development activity, not a research activity. There are firm deliverables as the end points of each part of the work. The major deliverables are: development plans for code development and materials testing; seal system components models; seal system performance specifications; seal materials specifications; and seal materials properties ''handbook.'' The work described in this plan is divided into three general tasks as follows: mathematical modeling; materials studies (salt, cementitious materials, and earthen materials); and large-scale testing. Each of the sections presents an overview, status, planned activities, and summary of program milestones. This plan will be the starting point for preparing the development plans described above, but is subject to change if preparation of the work plan indicates that a different approach or sequence is preferable to achieve the ultimate goal, i.e., support of design and licensing

  7. Role of legislation in population and development planning.

    Science.gov (United States)

    Jayasuriya, D C

    1986-09-01

    This article examines how law can influence population and development planning in the Asian and Pacific region. Countries in the region have a variety of legal systems and development dynamics, and variations in both occur even within countries, among different population groups. Population law regulates population growth, composition, and movement and induces behavior and attitudinal changes to enhance quality of life at all levels. Population law often also governs human reproduction (e.g. contraception, abortion), family formation (e.g. age factors, marriage), sexual behavior, (e.g. prostitution, rape), quality of life (e.g. education, employment, women's status), vital events (e.g. birth, death, marriage registration, residence) and the physical environment. Some national constitutions make mention of population/development objectives (China, Thailand) and equality of the sexes (e.g. Sri Lanka), an important step given that some countries have provided legal impediments to population planning; e.g. mang governments have been opposed to the use of IUD. Social trends such as later marriages have been in evidence. Abortion has prevented millions of births in Asia. The effect of illegality of abortion is generally to penalize the poor (who do not have resources to circumvent the law, and to increase female mortality indirectly through increases in abortion under poor medical conditions. Sexual sterilization is problematic in situations of coersion or where the infant mortality rate is high, or childless couples are stigmatized, because of its permanecnce. Law interfaces with contraceptive distribution in issues such as qualifications of distributors and age of recipients. The impact of the law on behavior and quality of life is not always clear. The role of legislation in development should be determined by multidisciplinar study groups, since no profession alone has enough perspective on development. Development policies should be global in nature, and mindful of

  8. Industrial developments challenging planning and research endeavours around Songkla Lake

    DEFF Research Database (Denmark)

    Jørgensen, Ulrik; Lauridsen, Erik Hagelskjær

    2004-01-01

    had several broad committees engaged in supporting these planning issues and resolve the conflicts be-tween different stakeholder interests in the regions development. The paper gives an overview over the types of problems that have been addressed in these major plans and studies and the types......, but the specific outcomes of the planning and the scientific result seem to be rather limited. In an attempt to find an explanation to this gap between planning and advice on one hand and the implementation on the other, it is important not only to look for policy answers. These would typically be ‘lack...

  9. Metaspace: Financial plan for development in space

    Science.gov (United States)

    Odonnell, Declan Joseph

    There are no sources for private development monies in space. There are no laws to regulate development in space and protect private investment. In order to cure these basic business problems, we may create a new nation in space, called the Metanation, to provide political focus and financial capacity. It will assume jurisdiction in outer space after a convention in the year 2000 A.D. It would offer to combine with space agencies of earth nations to form a relevant governance and policy entity for mankind and help develop our common heritage aloft.

  10. Strategic lessons in high-level waste management planning

    Energy Technology Data Exchange (ETDEWEB)

    Chapman, Neil

    1999-07-01

    This presentation discusses some issues in the planning and execution of high-level waste (HLW) disposal. The topics are (1) Initial considerations, (2) Issues in structuring a programme, (3) Disposal concepts, (4) Geological environments, (5) Site selection and characterisation, (6) Waste transport, (7) Performance assessment methodology and application, (8) Some key issues. The options for spent fuel management can give rise to a variety of different wastes. The quantity of waste arising will affect the volume of rock required for deposition, both with respect to rock integrity and requirements for heat dissipation. A repository must not be considered in isolation from the rest of the waste management programme. The repository development plan should be supported by a schedule of activities and related funding mechanisms, implying a long-term commitment in policy terms, and should include a corresponding legal and regulatory framework. The idea that disposed waste might be retrieved by future generations for processing under new technology is discussed. Safeguards requirements on fissile material within spent fuel or any other wastes imply indefinite control. Disposal concepts include the geological environment and the engineered barrier system within it. Site selection involves several steps: regional-scale characterisation, local characterisation, hydrological studies, etc. Key issues are retrieval vs. safeguards, optimisation of repository design, reducing long programme timescales, international collaboration.

  11. Computational aspects in high intensity ultrasonic surgery planning.

    Science.gov (United States)

    Pulkkinen, A; Hynynen, K

    2010-01-01

    Therapeutic ultrasound treatment planning is discussed and computational aspects regarding it are reviewed. Nonlinear ultrasound simulations were solved with a combined frequency domain Rayleigh and KZK model. Ultrasonic simulations were combined with thermal simulations and were used to compute heating of muscle tissue in vivo for four different focused ultrasound transducers. The simulations were compared with measurements and good agreement was found for large F-number transducers. However, at F# 1.9 the simulated rate of temperature rise was approximately a factor of 2 higher than the measured ones. The power levels used with the F# 1 transducer were too low to show any nonlinearity. The simulations were used to investigate the importance of nonlinarities generated in the coupling water, and also the importance of including skin in the simulations. Ignoring either of these in the model would lead to larger errors. Most notably, the nonlinearities generated in the water can enhance the focal temperature by more than 100%. The simulations also demonstrated that pulsed high power sonications may provide an opportunity to significantly (up to a factor of 3) reduce the treatment time. In conclusion, nonlinear propagation can play an important role in shaping the energy distribution during a focused ultrasound treatment and it should not be ignored in planning. However, the current simulation methods are accurate only with relatively large F-numbers and better models need to be developed for sharply focused transducers. Copyright 2009 Elsevier Ltd. All rights reserved.

  12. Strategic lessons in high-level waste management planning

    International Nuclear Information System (INIS)

    Chapman, Neil

    1999-01-01

    This presentation discusses some issues in the planning and execution of high-level waste (HLW) disposal. The topics are (1) Initial considerations, (2) Issues in structuring a programme, (3) Disposal concepts, (4) Geological environments, (5) Site selection and characterisation, (6) Waste transport, (7) Performance assessment methodology and application, (8) Some key issues. The options for spent fuel management can give rise to a variety of different wastes. The quantity of waste arising will affect the volume of rock required for deposition, both with respect to rock integrity and requirements for heat dissipation. A repository must not be considered in isolation from the rest of the waste management programme. The repository development plan should be supported by a schedule of activities and related funding mechanisms, implying a long-term commitment in policy terms, and should include a corresponding legal and regulatory framework. The idea that disposed waste might be retrieved by future generations for processing under new technology is discussed. Safeguards requirements on fissile material within spent fuel or any other wastes imply indefinite control. Disposal concepts include the geological environment and the engineered barrier system within it. Site selection involves several steps: regional-scale characterisation, local characterisation, hydrological studies, etc. Key issues are retrieval vs. safeguards, optimisation of repository design, reducing long programme timescales, international collaboration

  13. [Population planning unit is developed in the Congo].

    Science.gov (United States)

    Amouali, C; Poukouta, P

    1989-01-01

    This article is an update on the demographic situation in the Congo and the institutionalization of a population unit in The Ministry of Plan. From 1974-84 the population increased 44.9% going from 1,319,790 to 1,912,429 at a growth rate of 3.48% and possibly doubling in 20 years (2005). However, the major transformation has been the growth of the urban areas over the rural. From 1974-84 the rural population went from 819,430 to 934,849 while the urban population went from 500,360 in 1974 to 977,580 in 1984. The growth rate of the rural areas was 1.22% while that for the urban was 6.38% Infant mortality rate stands at 73/1000; life expectancy is 46.9 for men and 50.0 for women. The average fertility rate is 6. This demographic situation with the inherent problems of the rapidly growing urbanization of the 2 principal cities, Brazzaville and Pointe-Noire, has led to problems in health services and high morbidity and mortality rates. The Government has created 3 national organizations to coordinate population activities in the country: 1) The National Council on Population, (1988) an interministerial council, presided over by the Prime Minister, that defines and formulates national population policies as integral components to the country's socioeconomic development plans; 2) The National Commission on Population (CONAPO), headed by the Minister of Plan, Finance and Economics as the administrative organ of The National Council on Population, and responsible for the technical and evaluation activities of The National Council on Population; and 3) The Population Planning Unit headed by the Director of Human Resources in the Ministry of Plan responsible for identifying, formulating and evaluating population policies in the Congo. These institutions were created as a result of the 1974 Bucharest Conference and the 1984 Arusha Conference were population and development were considered integral components, and of results of 2 censuses and population surveys highlighting

  14. PLANNING THE WEDDING: DEVELOPMENT BASED UPON ECOSYSTEMS

    Science.gov (United States)

    Changing land uses to meet needs and expectations of the growing human population is largely responsible for habitat loss, species extinctions, deterioration of water quality and quantity, soil losses and depletion, and ecosystem goods and services. Although such development is...

  15. Integrated energy planning for sustainable development

    International Nuclear Information System (INIS)

    2008-09-01

    Improving access to energy is a multi-faceted challenge that has far-reaching implications and long-lasting obligations. Energy is essential to all human activities and, indeed, critical to social and economic development. Lack of energy is a contributing factor to states of perpetual poverty for individuals, communities, nations and regions. In contrast, access to energy opens many new opportunities; and meeting the United Nations Millennium Development Goals cannot be accomplished without access to affordable energy services

  16. Integrated energy planning for sustainable development

    International Nuclear Information System (INIS)

    2008-12-01

    Improving access to energy is a multi-faceted challenge that has far-reaching implications and long-lasting obligations. Energy is essential to all human activities and, indeed, critical to social and economic development. Lack of energy is a contributing factor to states of perpetual poverty for individuals, communities, nations and regions. In contrast, access to energy opens many new opportunities; and meeting the United Nations Millennium Development Goals cannot be accomplished without access to affordable energy services

  17. High-level waste management technology program plan

    International Nuclear Information System (INIS)

    Harmon, H.D.

    1995-01-01

    The purpose of this plan is to document the integrated technology program plan for the Savannah River Site (SRS) High-Level Waste (HLW) Management System. The mission of the SRS HLW System is to receive and store SRS high-level wastes in a see and environmentally sound, and to convert these wastes into forms suitable for final disposal. These final disposal forms are borosilicate glass to be sent to the Federal Repository, Saltstone grout to be disposed of on site, and treated waste water to be released to the environment via a permitted outfall. Thus, the technology development activities described herein are those activities required to enable successful accomplishment of this mission. The technology program is based on specific needs of the SRS HLW System and organized following the systems engineering level 3 functions. Technology needs for each level 3 function are listed as reference, enhancements, and alternatives. Finally, FY-95 funding, deliverables, and schedules are s in Chapter IV with details on the specific tasks that are funded in FY-95 provided in Appendix A. The information in this report represents the vision of activities as defined at the beginning of the fiscal year. Depending on emergent issues, funding changes, and other factors, programs and milestones may be adjusted during the fiscal year. The FY-95 SRS HLW technology program strongly emphasizes startup support for the Defense Waste Processing Facility and In-Tank Precipitation. Closure of technical issues associated with these operations has been given highest priority. Consequently, efforts on longer term enhancements and alternatives are receiving minimal funding. However, High-Level Waste Management is committed to participation in the national Radioactive Waste Tank Remediation Technology Focus Area. 4 refs., 5 figs., 9 tabs

  18. High-level waste management technology program plan

    Energy Technology Data Exchange (ETDEWEB)

    Harmon, H.D.

    1995-01-01

    The purpose of this plan is to document the integrated technology program plan for the Savannah River Site (SRS) High-Level Waste (HLW) Management System. The mission of the SRS HLW System is to receive and store SRS high-level wastes in a see and environmentally sound, and to convert these wastes into forms suitable for final disposal. These final disposal forms are borosilicate glass to be sent to the Federal Repository, Saltstone grout to be disposed of on site, and treated waste water to be released to the environment via a permitted outfall. Thus, the technology development activities described herein are those activities required to enable successful accomplishment of this mission. The technology program is based on specific needs of the SRS HLW System and organized following the systems engineering level 3 functions. Technology needs for each level 3 function are listed as reference, enhancements, and alternatives. Finally, FY-95 funding, deliverables, and schedules are s in Chapter IV with details on the specific tasks that are funded in FY-95 provided in Appendix A. The information in this report represents the vision of activities as defined at the beginning of the fiscal year. Depending on emergent issues, funding changes, and other factors, programs and milestones may be adjusted during the fiscal year. The FY-95 SRS HLW technology program strongly emphasizes startup support for the Defense Waste Processing Facility and In-Tank Precipitation. Closure of technical issues associated with these operations has been given highest priority. Consequently, efforts on longer term enhancements and alternatives are receiving minimal funding. However, High-Level Waste Management is committed to participation in the national Radioactive Waste Tank Remediation Technology Focus Area. 4 refs., 5 figs., 9 tabs.

  19. Action Plan for the Development of Civic Morality

    Science.gov (United States)

    Chinese Education and Society, 2006

    2006-01-01

    This paper discusses the action plan for the development of civic morality. Here, the importance, substance, ideology and policy principles guiding the development of civic morality is elaborated. In order to strengthen the development of civic morality, it is a must to adapt to the requirements of the developing situation; seize good…

  20. Settlement Networks in Polish Spatial Development Regional Plans

    Science.gov (United States)

    Sołtys, Jacek

    2017-10-01

    In 1999, ten years after the great political changes in Poland, 16 self-governed regions (in Polish: voivodeship) were created. According to Polish law, voivodeship spatial development plans, or regional plans in short, determine basic elements of the settlement network. No detailed regulations indicate the specific elements of the settlement network or what features of these elements should be determined. For this reason, centres as elements of the settlement network are variously named in different regions and take the form of various models. The purposes of the research described in this article are: (1) recognition and systematization of settlement network models determined in regional plans; and (2) assessment of the readability of determination in planning and its usefulness in the practice of regional policy. Six models of settlement networks in regional plans have been identified and classified into types and sub-types. Names of specific levels of centres indicate that they were classified according to two criteria: (1) level of services, which concerns only 5 voivodships; and (2) importance in development, which concerns the 11 other voivodships. The hierarchical model referring to the importance of development is less understandable than the one related to services. In the text of most plans, centres of services and centres of development are treated independently from their names. In some plans the functional types of towns and cities are indicated. In some voivodships, specifications in the plan text are too general and seem to be rather useless in the practice of regional policy. The author suggests that regional plans should determine two kinds of centres: hierarchical service centres and non-hierarchical centres of development. These centres should be further distinguished according to: (1) their role in the activation of surroundings; (2) their level of development and the necessity of action for their development; and (3) the types of actions

  1. Technology road mapping to guide development planning

    International Nuclear Information System (INIS)

    Goossen, J.E.; Congedo, T.V.

    2004-01-01

    For the past five years, Westinghouse Electric Company, has made ever increasing use of Technology Road Mapping, to direct company development efforts to achieve maximum benefits for our customers and ourselves. Comprised of business units in Nuclear Fuels, Nuclear Services and Nuclear Power Plants, including domestic and international business segments, Westinghouse must pay particular attention to coordinating development to satisfy the diverse needs of our growing international customer base. We must develop products which both benefit the individual Business Unit customer base, and which create synergy to produce the best possible offerings to the broader marketplace. The knowledge we gain through customer contacts and direct customer participation provides the basis from which we develop the Technology Road Map. This Road Map development process can be compared to painting a picture, where the background colors and features correspond to drivers related to the Customer and the prevailing features of the market environment. The subsequent layers of detail include broad Technical Objectives and then specific Technical Goals which will support achieving those objectives. The process is described in detail, and examples are provided. (authors)

  2. Site-specific development plan: Carlin, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    Fiore, J.H.

    1980-01-01

    The conditions for developing the geothermal resource near Carlin appear favorable. The resource has a favorable temperature range for direct applications (174/sup 0/F or 79/sup 0/C), the geothermal fluid has low total dissolved solids, no objectionable constituents that would result in costly scaling or corrosion problems and the resource is conveniently located within two miles from town. Direct space heating is the most realistic application and is recommended. Several clusters of homes are located less than 2 miles away. The project could be developed on a larger scale than this study proposes. The engineering and economic models are proposed on a small scale here for simplicity in evaluating the feasibility of pursuing development. Conceivably the producing well will provide sufficient hot water to accommodate more homes than the models include. The town of Carlin seems receptive to development and there does not appear to be any major barriers to exploration or development. The regulatory climate in both the state and county is conducive to geothermal development at this level. No major regulatory or environmental obstacles are noted which would severely curtail utilization for space heating. The prospect of replacing natural gas heat with geothermal heat for 60 or more homes is economically attractive. Geothermal rates for hot water are not expected to increase as rapidly as the price of natural gas to the consumer over the next 10 years. The increases for hot water from geothermal are primarily a function of power costs for the pumps plus inflation affecting maintenance costs. Individual homeowners can expect payback on retrofitting costs within two to three years.

  3. Plan of development of the Petrochemical sector

    International Nuclear Information System (INIS)

    Carta Petrolera

    1997-01-01

    With the discoveries of gas and petroleum in Cusiana and Piedemonte Llanero, one can speak in Colombia of reactivating the interest for the petrochemical development; theme that during a lot of times was forgotten, because the main interest has been of satisfying the national demand of fuels. Now, when that demand is already supplied, for the surpluses of natural gas, ethane, LPG and natural gasoline, product of the new discoveries, it should be taken advantage of, besides the export, for the development of the petrochemical industry in the country and to produce olefins, aromatic and nitrogenates

  4. Compact toroid development: activity plan for field reversed configurations

    International Nuclear Information System (INIS)

    1984-06-01

    This document contains the description, goals, status, plans, and approach for the investigation of the properties of a magnetic configuration for plasma confinement identified as the field reversed configuration (FRC). This component of the magnetic fusion development program has been characterized by its potential for physical compactness and a flexible range of output power. The included material represents the second phase of FRC program planning. The first was completed in February 1983, and was reported in DOE/ER-0160; Compact Toroid Development. This planning builds on that previous report and concentrates on the detailed plans for the next several years of the current DOE sponsored program. It has been deliberately restricted to the experimental and theoretical efforts possible within the present scale of effort. A third phase of this planning exercise will examine the subsequent effort and resources needed to achieve near term (1987 to 1990) FRC technical objectives

  5. Stakeholder participation in planning rural development strategies

    NARCIS (Netherlands)

    Sisto, Roberta; Lopolito, Antonio; Vliet, van Mathijs

    2018-01-01

    In advanced countries, rural areas are a complex web of social, political and historical factors. In addition, several kinds of uncertainties are usually present. As a consequence, frequent mismatches arise in practise between measures and rural development goals and priorities. To overcome this

  6. Fuel Fabrication Capability Research and Development Plan

    Energy Technology Data Exchange (ETDEWEB)

    Senor, David J.; Burkes, Douglas

    2013-06-28

    The purpose of this document is to provide a comprehensive review of the mission of the Fuel Fabrication Capability (FFC) within the Global Threat Reduction Initiative (GTRI) Convert Program, along with research and development (R&D) needs that have been identified as necessary to ensuring mission success. The design and fabrication of successful nuclear fuels must be closely linked endeavors.

  7. Developing Action Plans Based on Strategy

    DEFF Research Database (Denmark)

    Carstensen, Peter H.; Vinter, Otto

    2018-01-01

    The authors have performed a thorough study of the change strategy literature that is the foundation for the 10 overall change strategies defined in ISO/IEC 33014. Then the authors identified eight aspects that should be considered when developing the concrete actions for executing the strategy....

  8. Rural Planning in Regional Development: The Kenyan Experience ...

    African Journals Online (AJOL)

    Newly independent governments of Asia and Africa embarked on comprehensive ... had proved very effective in assisting European countries to recover from the destruction ... rural development planning and management, poverty alleviation ...

  9. Research and development strategic plan : FY2013-FY2017.

    Science.gov (United States)

    2013-05-01

    This plan describes the strategy through which the Federal Railroad Administrations (FRAs) research and development (R&D) program will support the Department of Transportations (DOTs) mission and goals. Safety is the DOTs primary strat...

  10. Next Generation Nuclear Plant Research and Development Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    P. E. MacDonald

    2005-01-01

    The U.S Department of Energy (DOE) is conducting research and development (R&D) on the Very High Temperature Reactor (VHTR) design concept for the Next Generation Nuclear Plant (NGNP) Project. The reactor design will be a graphite moderated, thermal neutron spectrum reactor that will produce electricity and hydrogen in a highly efficient manner. The NGNP reactor core could be either a prismatic graphite block type core or a pebble bed core. Use of a liquid salt coolant is also being evaluated. The NGNP will use very high-burnup, low-enriched uranium, TRISO-coated fuel, and have a projected plant design service life of 60 years. The VHTR concept is considered to be the nearest-term reactor design that has the capability to efficiently produce hydrogen. The plant size, reactor thermal power, and core configuration will ensure passive decay heat removal without fuel damage or radioactive material releases during accidents. The objectives of the NGNP Project are to: Demonstrate a full-scale prototype VHTR that is commercially licensed by the U.S. Nuclear Regulatory Commission Demonstrate safe and economical nuclearassisted production of hydrogen and electricity. The DOE laboratories, led by the INL, will perform R&D that will be critical to the success of the NGNP, primarily in the areas of: High temperature gas reactor fuels behavior High temperature materials qualification Design methods development and validation Hydrogen production technologies Energy conversion. The current R&D work is addressing fundamental issues that are relevant to a variety of possible NGNP designs. This document describes the NGNP R&D planned and currently underway in the first three topic areas listed above. The NGNP Advanced Gas Reactor (AGR) Fuel Development and Qualification Program is presented in Section 2, the NGNP Materials R&D Program Plan is presented in Section 3, and the NGNP Design Methods Development and Validation R&D Program is presented in Section 4. The DOE-funded hydrogen

  11. Next Generation Nuclear Plant Research and Development Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2005-01-01

    The U.S Department of Energy (DOE) is conducting research and development (R&D) on the Very High Temperature Reactor (VHTR) design concept for the Next Generation Nuclear Plant (NGNP) Project. The reactor design will be a graphite moderated, thermal neutron spectrum reactor that will produce electricity and hydrogen in a highly efficient manner. The NGNP reactor core could be either a prismatic graphite block type core or a pebble bed core. Use of a liquid salt coolant is also being evaluated. The NGNP will use very high-burnup, low-enriched uranium, TRISO-coated fuel, and have a projected plant design service life of 60 years. The VHTR concept is considered to be the nearest-term reactor design that has the capability to efficiently produce hydrogen. The plant size, reactor thermal power, and core configuration will ensure passive decay heat removal without fuel damage or radioactive material releases during accidents. The objectives of the NGNP Project are to: (1) Demonstrate a full-scale prototype VHTR that is commercially licensed by the U.S. Nuclear Regulatory Commission (2) Demonstrate safe and economical nuclear-assisted production of hydrogen and electricity. The DOE laboratories, led by the INL, will perform R&D that will be critical to the success of the NGNP, primarily in the areas of: (1) High temperature gas reactor fuels behavior; (2) High temperature materials qualification; (3) Design methods development and validation; (4) Hydrogen production technologies; and (5) Energy conversion. The current R&D work is addressing fundamental issues that are relevant to a variety of possible NGNP designs. This document describes the NGNP R&D planned and currently underway in the first three topic areas listed above. The NGNP Advanced Gas Reactor (AGR) Fuel Development and Qualification Program is presented in Section 2, the NGNP Materials R&D Program Plan is presented in Section 3, and the NGNP Design Methods Development and Validation R&D Program is presented

  12. Permitting plan for the high-level waste interim storage

    International Nuclear Information System (INIS)

    Deffenbaugh, M.L.

    1997-01-01

    This document addresses the environmental permitting requirements for the transportation and interim storage of solidified high-level waste (HLW) produced during Phase 1 of the Hanford Site privatization effort. Solidified HLW consists of canisters containing vitrified HLW (glass) and containers that hold cesium separated during low-level waste pretreatment. The glass canisters and cesium containers will be transported to the Canister Storage Building (CSB) in a U.S. Department of Energy (DOE)-provided transportation cask via diesel-powered tractor trailer. Tri-Party Agreement (TPA) Milestone M-90 establishes a new major milestone, and associated interim milestones and target dates, governing acquisition and/or modification of facilities necessary for: (1) interim storage of Tank Waste Remediation Systems (TWRS) immobilized HLW (IHLW) and other canistered high-level waste forms; and (2) interim storage and disposal of TWRS immobilized low-activity tank waste (ILAW). An environmental requirements checklist and narrative was developed to identify the permitting path forward for the HLW interim storage (HLWIS) project (See Appendix B). This permitting plan will follow the permitting logic developed in that checklist

  13. Enterprise Architecture Planning in developing A planning Information System: a Case Study of Semarang State University

    Directory of Open Access Journals (Sweden)

    Budiman Kholiq

    2018-01-01

    Full Text Available This research has applied an integrated design and development of planning information system, which is been designed using Enterprise Architecture Planning. Frequent discrepancy between planning and realization of the budget that has been made, resulted in ineffective planning, is one of the reason for doing this research. The design using EAP aims to keep development aligned and in line with the strategic direction of the organization. In the practice, EAP is carried out in several stages of the planning initiation, identification and definition of business functions, proceeded with architectural design and EA implementation plan that has been built. In addition to the design of the Enterprise Architecture, this research carried out the implementation, and was tested by several methods of black box and white box. Black box testing method is used to test the fundamental aspects of the software, tested by two kinds of testing, first is using User Acceptance Testing and the second is using software functionality testing. White box testing method is used to test the effectiveness of the code in the software, tested using unit testing. Tests conducted using white box and black box on the integrated planning information system, is declared successful. Success in the software testing can not be ascertained if the software built has not shown any distinction from prior circumstance to the development of this integrated planning information system. For ensuring the success of this system implementation, the authors test consistency between the planning of data and the realization of prior-use of the information system, until after-use information system. This consistency test is done by reducing the time data of the planning and realization time. From the tabulated data, the planning information system that has been built reduces the difference between the planning time and the realization time, in which indicates that the planning information system

  14. Enterprise Architecture Planning in developing A planning Information System: a Case Study of Semarang State University

    Science.gov (United States)

    Budiman, Kholiq; Prahasto, Toni; Kusumawardhani, Amie

    2018-02-01

    This research has applied an integrated design and development of planning information system, which is been designed using Enterprise Architecture Planning. Frequent discrepancy between planning and realization of the budget that has been made, resulted in ineffective planning, is one of the reason for doing this research. The design using EAP aims to keep development aligned and in line with the strategic direction of the organization. In the practice, EAP is carried out in several stages of the planning initiation, identification and definition of business functions, proceeded with architectural design and EA implementation plan that has been built. In addition to the design of the Enterprise Architecture, this research carried out the implementation, and was tested by several methods of black box and white box. Black box testing method is used to test the fundamental aspects of the software, tested by two kinds of testing, first is using User Acceptance Testing and the second is using software functionality testing. White box testing method is used to test the effectiveness of the code in the software, tested using unit testing. Tests conducted using white box and black box on the integrated planning information system, is declared successful. Success in the software testing can not be ascertained if the software built has not shown any distinction from prior circumstance to the development of this integrated planning information system. For ensuring the success of this system implementation, the authors test consistency between the planning of data and the realization of prior-use of the information system, until after-use information system. This consistency test is done by reducing the time data of the planning and realization time. From the tabulated data, the planning information system that has been built reduces the difference between the planning time and the realization time, in which indicates that the planning information system can motivate the

  15. Menopause: developing a rational treatment plan.

    Science.gov (United States)

    Vitiello, Danielle; Naftolin, Frederick; Naftoilin, Frederick; Taylor, Hugh S

    2007-12-01

    In recent years, growing importance has been afforded to assisting women in coping with the menopausal transition. Menopause is a normal stage of development and a woman's attitude toward this transition embodies biological, psychological and social influences. An enlarging body of conflicting data concerning menopausal hormone therapy (MHT) demands reassessment of established paradigms of disease prevention and menopausal health. Currently, a woman's decision to participate in or abstain from menopausal HT is personal. It involves not only consideration of risk stratification of potential harm and benefit, but also involves her expectations and attitudes toward perceived physical and emotional changes associated with this change. Through the use of extensive patient history, quality-of-life questionnaires and powerful biological profiling, we may be able to develop a rational approach to menopausal HT that safely guides our patients through this transition.

  16. Operations Plan for Support Network Development

    Energy Technology Data Exchange (ETDEWEB)

    None

    2008-06-30

    This report describes the operational processes and strategies that are building a support network for the National Security Technology Incubator (NSTI) program. The NSTI program currently is under development as part of the National Security Preparedness Project (NSPP), funded by Department of Energy (DOE)/National Nuclear Security Administration (NNSA) Grant No. DE FG52-07NA28084. Although the NSTI program offers a wide array of in-house business services, there are a certain number of services that will be provided by entities outside of Arrowhead Center. This report identifies the steps needed to develop an appropriate support network. The Arrowhead Center is working with external service providers and key stakeholders to establish feasible referral and implementation mechanics offering NSTI program participants the most comprehensive incubation services possible.

  17. Idaho Chemical Processing Plant Site Development Plan

    International Nuclear Information System (INIS)

    Ferguson, F.G.

    1994-02-01

    The Idaho Chemical Processing Plant (ICPP) mission is to receive and store spent nuclear fuels and radioactive wastes for disposition for Department of Energy (DOE) in a cost-effective manner that protects the safety of Idaho National Engineering Laboratory (INEL) employees, the public, and the environment by: Developing advanced technologies to process spent nuclear fuel for permanent offsite disposition and to achieve waste minimization. Receiving and storing Navy and other DOE assigned spent nuclear fuels. Managing all wastes in compliance with applicable laws and regulations. Identifying and conducting site remediation consistent with facility transition activities. Seeking out and implementing private sector technology transfer and cooperative development agreements. Prior to April 1992, the ICPP mission included fuel reprocessing. With the recent phaseout of fuel reprocessing, some parts of the ICPP mission have changed. Others have remained the same or increased in scope

  18. Developments in emergency planning within Scottish nuclear

    International Nuclear Information System (INIS)

    Simpson, A.

    2000-01-01

    Scottish Nuclear has recently completed a major program of improvements to its nuclear emergency facilities. The improvements include the construction of a purpose built Off-Site Emergency Centre for each of its two power stations and the development of a computer based information management system to facilitate the rapid distribution of information on an emergency to local, regional and national agencies. A computer code has also been developed to allow the rapid assessment of the effects of any accidental release on the local population. The improvements to the emergency facilities have been coupled with changes in local and national arrangements for dealing with a civil nuclear emergency. The use of airborne surveying techniques for rapidly determining levels of deposited activity following an accident is also being examined and preliminary airborne surveys have been carried out. (author)

  19. Ebeye 2023: Comprehensive Capacity Development Master Plan

    Science.gov (United States)

    2012-07-01

    Administration, Population and Demography , Information Systems, and Geospatial Science. The cost per credit hour at USP is estimated to be between...prosperity for a city. This statistic, coupled with the other determinants such as inflation , provide an assessment of a population’s ability to grow and...developing the fishing industry is the fishing rights are currently sold to Japan , which is a major stumbling block for commercial fishing. These

  20. Army Mobility Energy Research & Development Plan.

    Science.gov (United States)

    1980-01-01

    Energy Utilization MAJOR TECHNOLOGICAL BARRIERS: None. APPROACH: Develop (1) movie simulator, or (2) computer simulator with video display, or (3) working...cut-up chicken from slaughter, 3.5 weeks frozen storage to cooked condition, has an energy requirement of 46,000 kJ/kg edible portion contrasted to...radiation sterilized, cooked individual servings which have a comparable energy requirement of 14,160 kJ/kg edible portion. APPROACH: Conduct basic and

  1. Multi-Year SSL Market Development Support Plan

    Energy Technology Data Exchange (ETDEWEB)

    Ledbetter, Marc R.

    2012-05-01

    This plan sets out a strategic, five year framework for guiding DOE's market development support activities for high-performance solid-state lighting (SSL) products for the U.S. general illumination market. The market development support activities described in this plan, which span federal fiscal years 2012 to 2016, are intended to affect the types of SSL general illumination products adopted by the market, to accelerate commercial adoption of those products, and to support appropriate application of those products to maximize energy savings. DOE has established aggressive FY16 goals for these activities, including goals for the types of products brought to market, the market adoption of those products, and the energy savings achieved through use of SSL products. These goals are for the combined effect of DOE's SSL market development support and R and D investment, as well as the leveraged activities of its partners. Goals include: (1) inducing the market introduction of SSL products achieving 140 lumens per Watt (lm/W) for warm white products, and 155 lm/W for cool white products, and (2) inducing sales of high-performance SSL products that achieve annual site electricity savings of 21 terawatt hours (0.25 quadrillion Btus primary energy) by FY16. To overcome identified market barriers and to achieve the above five year goals, DOE proposes to carry out the following strategy. DOE will implement a multi-year program to accelerate adoption of good quality, high performance SSL products that achieve significant energy savings and maintain or improve lighting quality. Relying on lessons learned from past emerging technology introductions, such as compact fluorescent lamps, and using newly developed market research, DOE will design its efforts to minimize the likelihood that the SSL market will repeat mistakes that greatly delayed market adoption of earlier emerging technology market introductions. To achieve the maximum effect per dollar invested, DOE will

  2. Development and Application of a Planning Support System for Regional Spatial Functional Zoning Based on GIS

    Directory of Open Access Journals (Sweden)

    Xiaorui Zhang

    2016-09-01

    Full Text Available Regional spatial functional zoning in China is a large-scale strategic planning and requires very advanced planning decision support technology. With respect to spatial functional zoning, the planning support system (PSS is introduced as one of the most popular computer aided planning systems at the present time in this paper, and is further explained with the example of the latest regional main functional area (RMFA planning in China. On the Visual Studio.NET visualization development platform, the planning decision model, planning decision method, and GIS are organically integrated and customized by using the component-type secondary development technology of the ArcGIS Engine with the development language VB.NET. Hence, a highly efficient and flexible planning support system of regional main functional areas (RMFA-PSS is established. It was adopted in the research of the Beijing–Tianjin area in China and accordingly two types of main functional area planning are acquired. The RMFA-PSS offers an efficient and flexible decision support with regard to RMFA planning. The research can provide a reference for further PSS development and applications related to other types of spatial functional zoning.

  3. Economic planning and social justice in developing countries

    Energy Technology Data Exchange (ETDEWEB)

    Mehmet, O

    1978-01-01

    This book argues that development in LDCs (Less Developed Countries) cannot proceed in a sequential path - with income growth first and distribution after. Instead, egalitarian development, based on a combination of efficiency and equity criteria in the planning process, would emphasize employment creation, human resources, and rural and agricultural development, rather than urban-based industrial growth relying on imported capital-intensive technology. This, complemented with reforms in the political system, would be more in accord with the social needs and realities of LDCs. In particular, decentralized economic planning, responsive to the needs of rural communities, would offer an effective nonviolent revolutionary alternative. It is argued that egalitarian development is not only dependent on domestic reforms in LDCs, but also on a restructuring of international trade, aid and monetary systems for a more-equitable global distribution of income and wealth between nations. The book is divided into three parts: (1) devoted to a critical review of postwar growth and planning strategies; (2) based upon five case studies of Malaysia, Liberia, Pakistan, Brazil and Uganda, examines the influence of elites on economic planning and policy; and (3) offers elements of an egalitarian development planning. The book concludes with a brief summary on egalitarian planning as a non-violent revolution.

  4. Permanent isolation surface barrier development plan

    International Nuclear Information System (INIS)

    Wing, N.R.

    1994-01-01

    The exhumation and treatment of wastes may not always be the preferred alternative in the remediation of a waste site. In-place disposal alternatives, under certain circumstances, may be the most desirable alternatives to use in the protection of human health and the environment. The implementation of an in-place disposal alternative will likely require some type of protective covering that will provide long-term isolation of the wastes from the accessible environment. Even if the wastes are exhumed and treated, a long-term barrier may still be needed to adequately dispose of the treated wastes or any remaining waste residuals. Currently, no open-quotes provenclose quotes long-term barrier is available. The Hanford Site Permanent Isolation Surface Barrier Development Program (BDP) was organized to develop the technology needed to provide a long-term surface barrier capability for the Hanford Site. The permanent isolation barrier technology also could be used at other sites. Permanent isolation barriers use engineered layers of natural materials to create an integrated structure with redundant protective features. Drawings of conceptual permanent isolation surface barriers are shown. The natural construction materials (e.g., fine soil, sand, gravel, riprap, asphalt) have been selected to optimize barrier performance and longevity. The objective of current designs is to use natural materials to develop a maintenance-free permanent isolation surface barrier that isolates wastes for a minimum of 1,000 years by limiting water drainage to near-zero amounts; reducing the likelihood of plant, animal, and human intrusion; controlling the exhalation of noxious gases; and minimizing erosion-related problems

  5. Permanent isolation surface barrier development plan

    Energy Technology Data Exchange (ETDEWEB)

    Wing, N.R.

    1994-01-01

    The exhumation and treatment of wastes may not always be the preferred alternative in the remediation of a waste site. In-place disposal alternatives, under certain circumstances, may be the most desirable alternatives to use in the protection of human health and the environment. The implementation of an in-place disposal alternative will likely require some type of protective covering that will provide long-term isolation of the wastes from the accessible environment. Even if the wastes are exhumed and treated, a long-term barrier may still be needed to adequately dispose of the treated wastes or any remaining waste residuals. Currently, no {open_quotes}proven{close_quotes} long-term barrier is available. The Hanford Site Permanent Isolation Surface Barrier Development Program (BDP) was organized to develop the technology needed to provide a long-term surface barrier capability for the Hanford Site. The permanent isolation barrier technology also could be used at other sites. Permanent isolation barriers use engineered layers of natural materials to create an integrated structure with redundant protective features. Drawings of conceptual permanent isolation surface barriers are shown. The natural construction materials (e.g., fine soil, sand, gravel, riprap, asphalt) have been selected to optimize barrier performance and longevity. The objective of current designs is to use natural materials to develop a maintenance-free permanent isolation surface barrier that isolates wastes for a minimum of 1,000 years by limiting water drainage to near-zero amounts; reducing the likelihood of plant, animal, and human intrusion; controlling the exhalation of noxious gases; and minimizing erosion-related problems.

  6. Alkali deuteride negative ion source development plan

    International Nuclear Information System (INIS)

    Anon.

    1977-01-01

    A three phase program is described for the development of neutral beam systems. In the first phase, concluded in May, 1977, the laser initiated source was characterized. In phase two, scheduled for completion in September, 1978, negative ion confinement and extraction are investigated using laser energy deposition as a baseline method to produce D - . In addition other energy deposition schemes are studied in order to define a baseline energetic beam source system. The third phase is devoted to producing an integrated baseline system and scaling it up in current and energy to meet magnetic confinement system requirements

  7. National environmental plan, development and implications

    International Nuclear Information System (INIS)

    Pinto Martinez, Elias

    1996-01-01

    The causes of the environmental deterioration are analyzed in Colombia, one of them is the based on their economic development related with the inadequate exploitation of the natural resources, since very few they made it in a rational way, what has taken us to a permanent behavior, which it is necessary to modify but to modify it has to arrive to a change of attitude. It also refers to the supposition of a limited existence of the natural resources and the actions that should be carried out

  8. FY 1999 report on the results of the development of high efficiency lightning conversion compound semiconductor. Plan on lighting for the 21st century; Kokoritsu denko henkan kagobutsu handotai kaihatsu seika hokokusho. 21 seiki no akari keikaku

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    For the purpose of developing the white light-emitting diode (LEDs) lightening as 'a plan on lighting for the 21st century,' the results of the following R and D were obtained: 1) basic study of light-emitting mechanism; 2) improvement of epitaxial growth method of blue/ultraviolet LED; 3) substrate for homoepitaxial growth; 4) basic characteristics of phosphor-based light source for white LED lighting. In 1), light emitting mechanisms responsible for high-quantum efficiency of InGaN mixed semiconductors and InGaN/GaN quantum wells were studied by means of temperature-dependent photoluminescence (PL), time-resolved PL and selective-excitation PL spectroscopy. In 2), precise lapping and polishing procedures of sapphire and GaN crystalline substrates for epitaxial growth using metalorganic chemical-vapor-deposition and MBE showed favorable surface characteristics of substrates. In 3), study was made on growth conditions and growth mechanism of GaN bulk single crystals using the nitrogen pressure-controlled solution growth method. A size of 12mm diameter of GaN single crystal showing good crystallinity and PL characteristics were obtained. In 4), excitation, absorption and PL spectra of rare-earth doped Y{sub 2}O{sub 2}S red phosphor were studied in detail. (NEDO)

  9. Accelerated plan to develop magnetic fusion energy

    International Nuclear Information System (INIS)

    Fowler, T.K.

    1986-01-01

    We have shown that, despite funding delays since the passage of the Magnetic Fusion Engineering Act of 1980, fusion development could still be carried to the point of a demonstration plant by the year 2000 as called for in the Act if funding, now about $365 million per year, were increased to the $1 billion range over the next few years (see Table I). We have also suggested that there may be an economic incentive for the private sector to become in accelerating fusion development on account of the greater stability of energy production costs from fusion. Namely, whereas fossil fuel prices will surely escalate in the course of time, fusion fuel will always be abundantly available at low cost; and fusion technology poses less future risk to the public and the investor compared to conventional nuclear power. In short, once a fusion plant is built, the cost of generating electricity mainly the amortization of the plant capital cost - would be relatively fixed for the life of the plant. In Sec. V, we found that the projected capital cost of fusion plants ($2000 to $4000 per KW/sub e/) would probably be acceptable if fusion plants were available today

  10. Regulatory Technology Development Plan - Sodium Fast Reactor. Mechanistic Source Term - Trial Calculation. Work Plan

    International Nuclear Information System (INIS)

    Grabaskas, David; Bucknor, Matthew; Jerden, James; Brunett, Acacia J.

    2016-01-01

    The overall objective of the SFR Regulatory Technology Development Plan (RTDP) effort is to identify and address potential impediments to the SFR regulatory licensing process. In FY14, an analysis by Argonne identified the development of an SFR-specific MST methodology as an existing licensing gap with high regulatory importance and a potentially long lead-time to closure. This work was followed by an initial examination of the current state-of-knowledge regarding SFR source term development (ANLART-3), which reported several potential gaps. Among these were the potential inadequacies of current computational tools to properly model and assess the transport and retention of radionuclides during a metal fuel pool-type SFR core damage incident. The objective of the current work is to determine the adequacy of existing computational tools, and the associated knowledge database, for the calculation of an SFR MST. To accomplish this task, a trial MST calculation will be performed using available computational tools to establish their limitations with regard to relevant radionuclide release/retention/transport phenomena. The application of existing modeling tools will provide a definitive test to assess their suitability for an SFR MST calculation, while also identifying potential gaps in the current knowledge base and providing insight into open issues regarding regulatory criteria/requirements. The findings of this analysis will assist in determining future research and development needs.

  11. Practical considerations in developing an instrument-maintenance plan--

    International Nuclear Information System (INIS)

    Guth, M.A.S.

    1989-01-01

    The author develops a general set of considerations to explain how a consistent, well-organized, prioritized, and adequate time-allowance program plan for routine maintenance can be constructed. The analysis is supplemented with experience from the high flux isotope reactor (HFIR) at US Oak Ridge National Laboratory (ORNL). After the preventive maintenance (PM) problem was defined, the instruments on the schedule were selected based on the manufacturer's design specifications, quality-assurance requirements, prior classifications, experiences with the incidence of breakdowns or calibration, and dependencies among instruments. The effects of repair error in PM should be also studied. The HFIR requires three full-time technicians to perform both PM and unscheduled maintenance. A review is presented of concepts from queuing theory to determine anticipated breakdown patterns. In practice, the pneumatic instruments have a much longer lifetime than the electric/electronic instruments on various reactors at ORNL. Some special considerations and risk aversion in choosing a maintenance schedule

  12. Trans Ocean Gas CNG transportation development plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-11-01

    Liquefied natural gas (LNG) transportation is on the rise due to increased global demand for natural gas. However, the challenge of transporting LNG lies in finding suitable locations for import terminals. Compressed natural gas (CNG) transportation offers an alternative method for transporting stranded natural gas to existing markets and for creating new natural gas markets not practical for LNG or pipelines. The founder of Trans Ocean Gas Inc. (TOG) modified an existing fibre reinforced plastic (FRP) pressure vessel technology to safely store CNG on a ship. The newly developed containment system has proven to overcome all the deficiencies of steel-based systems. TOG patented the containment system and will license its use to owners of stranded gas and shipping service providers around the world. Financial support is needed to perform verification testing and for regulatory approval. The CNG systems will be built and assembled throughout facilities in Atlantic Canada. 2 tabs., 3 figs.

  13. High-heat tank safety issue resolution program plan

    International Nuclear Information System (INIS)

    Wang, O.S.

    1993-12-01

    The purpose of this program plan is to provide a guide for selecting corrective actions that will mitigate and/or remediate the high-heat waste tank safety issue for single-shell tank (SST) 241-C-106. This program plan also outlines the logic for selecting approaches and tasks to mitigate and resolve the high-heat safety issue. The identified safety issue for high-heat tank 241-C-106 involves the potential release of nuclear waste to the environment as the result of heat-induced structural damage to the tank's concrete, if forced cooling is interrupted for extended periods. Currently, forced ventilation with added water to promote thermal conductivity and evaporation cooling is used to cool the waste. At this time, the only viable solution identified to resolve this safety issue is the removal of heat generating waste in the tank. This solution is being aggressively pursued as the permanent solution to this safety issue and also to support the present waste retrieval plan. Tank 241-C-106 has been selected as the first SST for retrieval. The program plan has three parts. The first part establishes program objectives and defines safety issues, drivers, and resolution criteria and strategy. The second part evaluates the high-heat safety issue and its mitigation and remediation methods and alternatives according to resolution logic. The third part identifies major tasks and alternatives for mitigation and resolution of the safety issue. Selected tasks and best-estimate schedules are also summarized in the program plan

  14. Workshop for development of formal MC and A plans

    International Nuclear Information System (INIS)

    Erkkila, B.H.; Hatcher, C.R.; Scott, S.C.; Thomas, K.E.

    1998-01-01

    Upgrades to both physical protection and material controls and accountability (MC and A) are progressing at many nuclear facilities in the Russian Federation. In general, Russian facilities are well prepared to address issues related to physical protection. The infrastructure to plan and implement physical protection upgrades is already in place in Russia. The infrastructure to integrate new and existing MC and A capabilities is not as well developed. The authors experience has shown that working with Russian facility management and technical personnel to draft an MC and A plan provides a way of moving MC and A upgrades forward. Los Alamos has developed a workshop for Russian nuclear facilities to facilitate the preparation of their facility MC and A plans. The workshops have been successful in bringing together facility management, safeguards specialists, and operations personnel to initiate the process of drafting these MC and A plans. The MC and A plans provide the technical basis for scheduling future MC and A upgrades at the facilities. Although facility MC and A plans are site specific, the workshop can be tailored to guide the development of an MC and A plan for any Russian nuclear site

  15. Highly enriched uranium (HEU) storage and disposition program plan

    International Nuclear Information System (INIS)

    Arms, W.M.; Everitt, D.A.; O'Dell, C.L.

    1995-01-01

    Recent changes in international relations and other changes in national priorities have profoundly affected the management of weapons-usable fissile materials within the United States (US). The nuclear weapon stockpile reductions agreed to by the US and Russia have reduced the national security requirements for these fissile materials. National policies outlined by the US President seek to prevent the accumulation of nuclear weapon stockpiles of plutonium (Pu) and HEU, and to ensure that these materials are subjected to the highest standards of safety, security and international accountability. The purpose of the Highly Enriched Uranium (HEU) Storage and Disposition Program Plan is to define and establish a planned approach for storage of all HEU and disposition of surplus HEU in support of the US Department of Energy (DOE) Fissile Material Disposition Program. Elements Of this Plan, which are specific to HEU storage and disposition, include program requirements, roles and responsibilities, program activities (action plans), milestone schedules, and deliverables

  16. Status of muon collider research and development and future plans

    Directory of Open Access Journals (Sweden)

    1999-08-01

    Full Text Available The status of the research on muon colliders is discussed and plans are outlined for future theoretical and experimental studies. Besides work on the parameters of a 3–4 and 0.5 TeV center-of-mass (COM energy collider, many studies are now concentrating on a machine near 0.1 TeV (COM that could be a factory for the s-channel production of Higgs particles. We discuss the research on the various components in such muon colliders, starting from the proton accelerator needed to generate pions from a heavy-Z target and proceeding through the phase rotation and decay (π→μν_{μ} channel, muon cooling, acceleration, storage in a collider ring, and the collider detector. We also present theoretical and experimental R&D plans for the next several years that should lead to a better understanding of the design and feasibility issues for all of the components. This report is an update of the progress on the research and development since the feasibility study of muon colliders presented at the Snowmass '96 Workshop [R. B. Palmer, A. Sessler, and A. Tollestrup, Proceedings of the 1996 DPF/DPB Summer Study on High-Energy Physics (Stanford Linear Accelerator Center, Menlo Park, CA, 1997].

  17. PLAN Bicol, Philippines: health manpower development program in action.

    Science.gov (United States)

    Lind, K

    1994-06-01

    PLAN Bicol in the Philippines is a community based Health Manpower Development Program (HMDP) geared toward training and mobilization of indigenous health practitioners, providing infrastructural and logistical support to individual families, and educating the community about health, nutrition, and the environment. The field officer recommends at the initiation of a project that program staff have roles that are well defined. New programs should be introduced to the community first and should involve the community in the planning stages. The HMDP program is directed to 38 villages located around national parks that have suffered from deforestation. Community health issues are malnutrition, low immunization, and lack of access to health services. HMDP established a training program for auxiliary health workers (AHWs), who make a commitment to return to their villages after training. Midwives are being trained at local schools. Village houses are being built and repaired; water systems and sanitary toilet facilities are being installed. Village health stations have been constructed and equipped with basic medicines, supplies, and equipment, and are open 5 days a week. Health education classes inform the community about nutrition and health. The problems at inception were the unwillingness of field staff to participate in the program and a high drop out rate among AHWs. Problems were worked out as the program progressed. Facilitative factors are the close coordination with the provincial health office, community acceptance, and the availability of qualified people.

  18. Planning Development for a Family Planning Centre in Nursing Unit of the General Hospital of Argolida

    OpenAIRE

    Koukoufilippou J; Koinis A.

    2015-01-01

    Introduction: The family planning centres must be upgraded to a cornerstone of primary health care, and prevent, advise and protect the citizen's health while reducing hospitalization costs for hospitals. Aim: The purpose of this literature review is the family planning centre development in general hospital of Argolida that has a similar clinic. Material and Methods: Literature review was conducted of published English and Greek Articles from bibliographic databases Medline, Goog...

  19. Family planning and development helping women world-wide.

    Science.gov (United States)

    Mahler, H

    1989-04-01

    This article discusses the need for family planning (FP) as part of the development process, applauds its successes and rallies continued momentum of the FP movement. 500,000 women die each year from pregnancy- or labor-related conditions, and 10s of millions of women suffer pregnancy-related illnesses and impairments that undermine their social and economic productivity. Moreover, the 4 major factors that lead to high-risk pregnancies, namely, becoming pregnant before the age of 20, after the age of 35, after 4 or more pregnancies, and 2 years after an earlier pregnancy, all reveal the need for FP. These tragedies could be avoided by assuring better nutrition, primary health care for all, good antenatal attention and proper facilities and help in childbirth, access to good obstetric care in emergency situations, and universally available FP services. FP organizations must empower women with the knowledge of FP and the means to put it into practice. Developing countries, such as China, India, Indonesia, Thailand and Mexico, in addition to affluent industrialized countries have made strides in FP with the help of such organizations as the International Planned Parenthood Federation (IPPF). IPPF has helped to motivate large numbers of men and women to determine their ideal family size. It has provided the means for them to reach such goals and has ensured that acceptance of FP has been on a voluntary basis. IPPF has also advised and cajoled governments into becoming involved in FP. In the future, national strategies must produce the building blocks for better policies to help women become more responsible for their lives. The education of women will be vital to achieving this objective as well as other aspects of development.

  20. Planning and developing medical tourism in megalopolis Shiraz

    Directory of Open Access Journals (Sweden)

    Masoud Safaeepour

    2015-01-01

    Full Text Available Medical tourism is an international phenomenon where some tourists travel long to reach treatment-therapeutic services because of high expenses, long waits, lacking in insurance, and applying services and insufficient access to health services in the destination. This industry, now, by making 60 billion dollars annually in international level, has been considered as one the most profitable markets and the number of countries to provide facilities and treatment services for foreign tourists tend to increase. Many countries provide applicable and legal plans for development of this industry. This paper aims at planning and improving medical tourism in megalopolis Shiraz. The dominating approach in the present study is developmental-applied and the method is descriptive, analytical and survey study. To analyze the data and to test the research hypothesis, the linear Pearson correlation and ANOVA were used. The results of the present study have indicated that all quality factors of treatment and tourism services, culture, facilities, medical and tourist equipment and ICT, had positive and direct correlation with developing medical tourism and the factor of price had negative and reverse correlation with it. In other words, the higher the price is, the less the medical tourism development is and vice versa. Also, the ANOVA showed that among medical tourists from various countries regarding satisfaction with the price of treatment and tourist services, the quality of treatment and tourist services, culture, facilities, medical and tourist equipment and ICT, there are significant differences and Kuwaiti tourists were the most satisfied tourists and Afghani ones were the least satisfied.

  1. Career Mapping for Professional Development and Succession Planning.

    Science.gov (United States)

    Webb, Tammy; Diamond-Wells, Tammy; Jeffs, Debra

    Career mapping facilitates professional development of nurses by education specialists and nurse managers. On the basis of national Nursing Professional Development Scope and Standards, our education and professional development framework supports the organization's professional practice model and provides a foundation for the professional career map. This article describes development, implementation, and evaluation of the professional career map for nurses at a large children's hospital to support achievement of the nursing strategic goals for succession planning and professional development.

  2. Hazardous Waste Development, Demonstration, and Disposal (HAZWDDD) Program Plan

    International Nuclear Information System (INIS)

    McGinnis, C.P.; Eisenhower, B.M.; Reeves, M.E.; DePaoli, S.M.; Stinton, L.H.; Harrington, E.H.

    1989-02-01

    The objective of the Hazardous Waste Development, Demonstration and Disposal (HAZWDDD) Program Plan is to ensure that the needs for treatment and disposal of all its hazardous and mixed wastes have been identified and planned for. A multifaceted approach to developing and implementing this plan is given, including complete plans for each of the five installations, and an overall integrated plan is also described in this report. The HAZWDDD Plan accomplishes the following: (1) provides background and organizational information; (2) summarizes the 402 hazardous and mixed waste streams from the five installations by grouping them into 13 general waste categories; (3) presents current treatment, storage, and disposal capabilities within Energy Systems; (4) develops a management strategy by outlining critical issues, presents flow sheets describing management schemes for problem waste streams, and builds on the needs identified; (5) outlines specific activities needed to implement the strategy developed; and (6) presents schedule and budget requirements for the next decade. The HAZWDDD Program addresses current and future technical problems and regulatory issues and uncertainties. Because of the nature and magnitude of the problems in hazardous and mixed waste management, substantial funding will be required. 10 refs., 39 figs., 16 tabs

  3. Planning of spatial development of tourism based on the example of spatial plan of Subotica municipality

    Directory of Open Access Journals (Sweden)

    Šećerov Velimir

    2008-01-01

    Full Text Available Planning of tourism development and its spatial disposition in Europe and world today are an important segment of the overall economic development. Having in mind its important economic and social functions, as well as its capability to intensify its other economic branches (agricultural and economic potentials, services of various types, transport and other in a certain territory, it is necessary to realize a precise valorization of tourist values in the spatial plan of municipality and to conclude at what point and at which places the tourism can represent on of development components of the entire economy of the territory to be planed. The example of the spatial plan of Subotica and main guidelines, concept and planning priorities which can be expected in the forthcoming period are presented in this paper. It is without any doubt that the municipality of Subotica with its geostrategic position, the proximity of the EU and important natural and cultural tourist potentials is a suitable space for application of contemporary principles of the tourism development planning and their correlation with other segments of integral development for the whole municipality.

  4. Dynamic plan modelling and visualization : converting an urban development plan into a transition scenario

    NARCIS (Netherlands)

    Vries, de B.; Jessurun, A.J.; Sadowski - Rasters, G.; Tidafy, T; Dorta, T

    2009-01-01

    Application of 3D models in urban planning practice is still limited to visualization of existing or newly designed situations. Municipalities are looking for possibilities to communicate the transition process of the urban development area with the citizens. A prototype system was developed to

  5. Center Planning and Development: Multi-User Spaceport Initiatives

    Science.gov (United States)

    Kennedy, Christopher John

    2015-01-01

    The Vehicle Assembly building at NASAs Kennedy Space Center has been used since 1966 to vertically assemble every launch vehicle, since the Apollo Program, launched from Launch Complex 39 (LC-39). After the cancellation of the Constellation Program in 2010 and the retirement of the Space Shuttle Program in 2011, the VAB faced an uncertain future. As the Space Launch System (SLS) gained a foothold as the future of American spaceflight to deep space, NASA was only using a portion of the VABs initial potential. With three high bays connected to the Crawler Way transportation system, the potential exists for up to three rockets to be simultaneously processed for launch. The Kennedy Space Center (KSC) Master plan, supported by the Center Planning and Development (CPD) Directorate, is guiding Kennedy toward a 21st century multi-user spaceport. This concept will maintain Kennedy as the United States premier gateway to space and provide multi-user operations through partnerships with the commercial aerospace industry. Commercial aerospace companies, now tasked with transporting cargo and, in the future, astronauts to the International Space Station (ISS) via the Commercial Resupply Service (CRS) and Commercial Crew Program (CCP), are a rapidly growing industry with increasing capabilities to make launch operations more economical for both private companies and the government. Commercial operations to Low Earth Orbit allow the government to focus on travel to farther destinations through the SLS Program. With LC-39B designated as a multi-use launch pad, companies seeking to use it will require an integration facility to assemble, integrate, and test their launch vehicle. An Announcement for Proposals (AFP) was released in June, beginning the process of finding a non-NASA user for High Bay 2 (HB2) and the Mobile Launcher Platforms (MLPs). An Industry Day, a business meeting and tour for interested companies and organizations, was also arranged to identify and answer any

  6. Plan for gas overcrowding; Development in last decade

    International Nuclear Information System (INIS)

    Unidad de Planeacion Minero Energetica, UPME

    2000-01-01

    The plan for gas overcrowding, is one of the most important determinations of energy politics in last decade. It is an integral plan of consumption of combustible gas; that is to say, cover the natural gas and the liquefied gas of petroleum. In this article, the UPME wants to show the results of the implementation of this measure. The analysis shows, in the first place the impact achieved in the diversification of the energetic basket, with the penetration of the combustible gas. Facts and indicators of development of the plan are given that include an evaluation of the direct financial benefit that receive the homes, when using a more economic fuel. On the other hand, it puts on of present the government effort carried out through ECOPETROL and that of some private agents to start the plan. Finally, the investments made until today and the problems of low use of some nets of transport, related with the development of the market

  7. Integrated National Energy Planning (INEP) in developing countries

    International Nuclear Information System (INIS)

    Munasinghe, M.

    1989-01-01

    Issues of coordinated energy planning are emphasized, with particular reference to interrelationships among the policies adopted in various energy sub-sectors such as electric power (including hydro, nuclear, geothermal, oil and coal sources), petroleum, natural gas, coal, non-conventional (solar, bio-gas, mini-hydro) and traditional fuels (woodfuel, bagasse or vegetable residue). The scope and objectives of integrated national energy planning, the policy tools available, and constraints particular to the developing countries are discussed next. Section 3.0 outlines how energy planning is carried out, while the problems of implementing the resulting policy conclusions are examined in section 4.0. 5 refs, 4 figs

  8. Development of a decommissioning plan for nuclear power plant 'Krsko'

    International Nuclear Information System (INIS)

    Tankosic, Djurica; Fink, Kresimir

    1991-01-01

    Nuclear Power Plant 'Krsko' (NEK), is the only nuclear power plant in Yugoslavia, is a two-loop, Westinghouse-design, pressurized water reactor rated at 632 MWe. When NEK applied for an operating license in 1981, it did not have to explain how the plant would be decommissioned and decommissioning provisions were not part of the licensing process. Faced with mounting opposition to nuclear power and a real threat that the plant would be shut down, the plant management developed a Mission Plan for resolving the decommissioning problem. The Mission Plan calls for a preliminary decommissioning plan to be prepared and submitted to the local regulatory body before the end of 1992

  9. Developing the strategic plan for pollution prevention in defense programs

    International Nuclear Information System (INIS)

    Marchetti, John A.; Betschart, James F.; Suffern, J. Samuel

    1992-01-01

    In order to provide effective leadership and to ensure a consistent pollution prevention effort in all of its production facilities and laboratories, Defense Programs (DP) Headquarters, in close cooperation with the Field, has developed a strategic plan for its Pollution Prevention Program. The strategic plan is built upon the history of waste minimization, waste reduction, and pollution prevention activity to date, and articulates both long- and short-term strategies to ensure program initiation, growth, and stability. The organization of the program, including Headquarters staffing and linkages to the Geld, is described. Life-cycle analysis of program barriers and bottlenecks, along with associated initiatives and action plans are discussed. (author)

  10. Development of Facilities Master Plan and Laboratory Renovation Project

    Energy Technology Data Exchange (ETDEWEB)

    Fox, Andrea D

    2011-10-03

    Funding from this grant has allowed Morehouse School of Medicine to complete its first professionally developed, comprehensive campus master plan that is in alignment with the recently completed strategic plan. In addition to master planning activities, funds were used for programming and designing research renovations, and also to supplement other research facility upgrades by providing lighting and equipment. The activities funded by this grant will provide the catalyst for substantial improvement in the School's overall facilities for biomedical education and research, and will also provide much of the information needed to conduct a successful campaign to raise funds for proposed buildings and renovations.

  11. Strategic plan for the development of IAEA safeguards equipment

    International Nuclear Information System (INIS)

    Khlebnikov, N.

    2001-01-01

    Full text: The need for a top-down Safeguards Strategy to focus departmental objectives was recognized by the Programme Performance Appraisal System (PPAS) performed on the Equipment Development Project in 1999. The Department of Safeguards prepared at the end of 2000 a 5-year Strategic Plan to identify the changes and improvements expected to take place over the 2001-2005 period. Those Strategic Objectives were supposed to be used to properly plan IAEA Safeguards activities and define appropriate and coherent R and D programmes. The present paper describes the strategic directions that the IAEA will follow in the area of equipment development in order to meet the Safeguards Department long-term objectives for 2001-2005. The paper, which is derived from the IAEA Strategic Equipment Development Plan, prepared by the Division of Technical Support, includes two parts: general principles and policies applicable to all equipment development tasks; specific strategic guidance. The paper will not describe the detailed plans which are prepared based on the strategic plan on a biannual basis. Equipment development activities have been divided in five major projects (NDA, Seals, Surveillance, Unattended Monitoring and Remote Monitoring). Strategic directions for each of these projects will be described in the paper. Separate sections will deal with equipment development strategic guidance in the area of additional protocol inspections, JNFL projects, illicit trafficking and Trilateral Initiative. (author)

  12. Developing a business plan for Ski School Jasna

    OpenAIRE

    Dubovská, Jana

    2014-01-01

    The Master's Thesis analyses and evaluates the conditions for the Ski & Snowboard School Lúčky development in the Jasná Nízke Tatry ski resort as well as it illustrates specific steps and actions in the realistic business plan. Firstly, it introduces theoretical background of feasibility analysis, business model, and the business plan focusing on the importance and structure of each topic. Secondly, the thesis portrays the results of an empirical research conducted on the target audience that...

  13. High-Level Waste Systems Plan. Revision 7 (U)

    International Nuclear Information System (INIS)

    Brooke, J.N.; Gregory, M.V.; Paul, P.; Taylor, G.; Wise, F.E.; Davis, N.R.; Wells, M.N.

    1996-10-01

    This revision of the High-Level Waste (HLW) System Plan aligns SRS HLW program planning with the DOE Savannah River (DOE-SR) Ten Year Plan (QC-96-0005, Draft 8/6), which was issued in July 1996. The objective of the Ten Year Plan is to complete cleanup at most nuclear sites within the next ten years. The two key principles of the Ten Year Plan are to accelerate the reduction of the most urgent risks to human health and the environment and to reduce mortgage costs. Accordingly, this System Plan describes the HLW program that will remove HLW from all 24 old-style tanks, and close 20 of those tanks, by 2006 with vitrification of all HLW by 2018. To achieve these goals, the DWPF canister production rate is projected to climb to 300 canisters per year starting in FY06, and remain at that rate through the end of the program in FY18, (Compare that to past System Plans, in which DWPF production peaked at 200 canisters per year, and the program did not complete until 2026.) An additional $247M (FY98 dollars) must be made available as requested over the ten year planning period, including a one-time $10M to enhance Late Wash attainment. If appropriate resources are made available, facility attainment issues are resolved and regulatory support is sufficient, then completion of the HLW program in 2018 would achieve a $3.3 billion cost savings to DOE, versus the cost of completing the program in 2026. Facility status information is current as of October 31, 1996

  14. Strategic Plan for Light Water Reactor Research and Development

    International Nuclear Information System (INIS)

    2004-01-01

    The purpose of this strategic plan is to establish a framework that will allow the Department of Energy (DOE) and the nuclear power industry to jointly plan the nuclear energy research and development (R and D) agenda important to achieving the Nation's energy goals. This strategic plan has been developed to focus on only those R and D areas that will benefit from a coordinated government/industry effort. Specifically, this plan focuses on safely sustaining and expanding the electricity output from currently operating nuclear power plants and expanding nuclear capacity through the deployment of new plants. By focusing on R and D at addresses the needs of both current and future nuclear plants, DOE and industry will be able to take advantage of the synergism between these two technology areas, thus improving coordination, enhancing efficiency, and further leveraging public and private sector resources. By working together under the framework of this strategic plan, DOE and the nuclear industry reinforce their joint commitment to the future use of nuclear power and the National Energy Policy's goal of expanding its use in the United States. The undersigned believe that a public-private partnership approach is the most efficient and effective way to develop and transfer new technologies to the marketplace to achieve this goal. This Strategic Plan is intended to be a living document that will be updated annually

  15. Environmental Development Plan for Transportation Energy Conservation. FY 79 update

    Energy Technology Data Exchange (ETDEWEB)

    Singh, M. K.; Bernard, III, M. J.

    1978-12-15

    This is the first annual update of the Environment Development Plan (EDP) for the DOE Division of Transportation Energy Conservation program. It identifies the ecosystem, resource, physical environment, health, safety, and socioeconomic concerns associated with the division's transportation programs. These programs include the research, development, demonstration and assessment (RDD and A) of seventeen transportation technologies and several strategy and policy development and implementation projects. The transportation technologies projects deal with highway transport including electric vehicles, marine transport and pipeline transport. This EDP presents a research and assessment plan for resolving any potentially adverse environmental concerns stemming from these programs.

  16. High performance fuel technology development

    Energy Technology Data Exchange (ETDEWEB)

    Koon, Yang Hyun; Kim, Keon Sik; Park, Jeong Yong; Yang, Yong Sik; In, Wang Kee; Kim, Hyung Kyu [KAERI, Daejeon (Korea, Republic of)

    2012-01-15

    {omicron} Development of High Plasticity and Annular Pellet - Development of strong candidates of ultra high burn-up fuel pellets for a PCI remedy - Development of fabrication technology of annular fuel pellet {omicron} Development of High Performance Cladding Materials - Irradiation test of HANA claddings in Halden research reactor and the evaluation of the in-pile performance - Development of the final candidates for the next generation cladding materials. - Development of the manufacturing technology for the dual-cooled fuel cladding tubes. {omicron} Irradiated Fuel Performance Evaluation Technology Development - Development of performance analysis code system for the dual-cooled fuel - Development of fuel performance-proving technology {omicron} Feasibility Studies on Dual-Cooled Annular Fuel Core - Analysis on the property of a reactor core with dual-cooled fuel - Feasibility evaluation on the dual-cooled fuel core {omicron} Development of Design Technology for Dual-Cooled Fuel Structure - Definition of technical issues and invention of concept for dual-cooled fuel structure - Basic design and development of main structure components for dual- cooled fuel - Basic design of a dual-cooled fuel rod.

  17. Developments in high energy theory

    Indian Academy of Sciences (India)

    journal of. July 2009 physics pp. 3–60. Developments in high energy theory .... and operated by CERN (European Organization for Nuclear Research), this ma- ...... [2] S Dodelson, Modern cosmology (Academic Press, Amsterdam, 2003).

  18. Final Report - Development of a Strategic Energy Plan

    Energy Technology Data Exchange (ETDEWEB)

    Maracas, Kate; Hooks, Todd

    2006-11-30

    The Agua Caliente Band of Cahuilla Indians was awarded a grant under the U.S. Department of Energy’s (“DOE”) Tribal Energy Program to develop a comprehensive Tribal energy plan. The grant, awarded under DOE’s First Steps program, supported the development of a strategic energy plan that integrates with the Tribe’s overall planning and economic development goals, and aligns with Tribal cultural, social, political, and spiritual values. The Tribe set out to incorporate its energy plan into (i) a broader economic development strategy developed by investigators at the University of California at Riverside, and (ii) the overarching goals for job-creation and wealth-creation that are held by both the Tribe and the surrounding Coachella Valley. With these wide-ranging objectives in mind, the Tribe and its consultant, Red Mountain Energy Partners, engaged in a phased approach to creating the strategic energy plan. As illustrated in Figure 1 below, the proposed approach involved both “serial” and “parallel” activities. The capacity-building component of this approach occurred throughout the duration of the project period.

  19. ATLAS Plans for the High-Luminosity LHC

    CERN Document Server

    Walkowiak, Wolfgang; The ATLAS collaboration

    2018-01-01

    In this talk for BEAUTY 2018 the ATLAS upgrade plans for the high-luminosity phase of the LHC are presented. Especially, prospects for the flagship B physics analyses $B_s^0 \\to J/\\psi \\phi$ (with $J/\\psi \\to \\mu^+\\mu^-$) and $B_{(s)}^0 \\to \\mu^+\\mu^-$ analyses are discussed.

  20. Safety Standards Plan for Middlesex County Vocational & Technical High Schools.

    Science.gov (United States)

    Sommer, Cy

    This vocational education safety standards plan outlines rules and regulations adopted by the Board of Education of Middlesex County Vocational and Technical High Schools. The first of eleven chapters presents demographics and a safety organization table for Middlesex County Vocational and Technical Schools. In chapter 2, six safety program…

  1. American Historical Association Faculty Development Program: Planning and Implementation.

    Science.gov (United States)

    Hoffmann, Charles

    The planning and implementation processes of the Long Island Faculty Development Program are described. Originally sponsored by the American Historical Association's Faculty Development Program to improve history instruction, this project includes faculty representatives from four Long Island universities, colleges, and junior colleges. The…

  2. National negative-ion-based neutral-beam development plan

    International Nuclear Information System (INIS)

    Cooper, W.S.; Pyle, R.V.

    1983-08-01

    The plan covers facilities required, program milestones, and decision points. It includes identification of applications, experiments, theoretical research areas, development of specific technologies and reactor development and demonstration facilities required to bring about the successful application of negative-ion-based neutral beams. Particular emphasis is placed on those activities leading to use on existing plasma confinement experiments or their upgrades

  3. Building capacity for energy and electricity planning for sustainable development

    International Nuclear Information System (INIS)

    2008-09-01

    The IAEA, through its Planning and Economic Studies Section (PESS), assists Member States to build their capacities to perform analyses for developing alternative strategies for sustainable energy development, evaluate the energy-economic-environmental implications and assess the potential contribution of nuclear energy in securing affordable and clean supplies of energy

  4. Planning Mechanisms for Regional Electric Power Supply System Development

    Directory of Open Access Journals (Sweden)

    Evgeniy Anatolyevich Malyshev

    2015-12-01

    Full Text Available Key problems of the regional electric power supply systems are examined. These problems result from a lack of regulated interaction mechanisms for uniting the different entities’ resources aimed at the realization of investment activities. One of the main problems of the power supply industry is physical and moral aging of both generating and networking equipment. In the article, the necessity of management system formation to control the development of power sector has been proved. The deficiencies of the modern investment procedure in power companies are described. The absence of continuity between the regional and local strategic planning documents and investment planning of a power company has been found out. The possibility to develop a new mechanism for attracting investment has been proposed. The regulation of joint activities to implement the development program for the regional power supply industry has been proposed. The management system to develop the Russian power industry has been proposed. The comparative analysis of generating capacity development mechanisms has been carried out, such as capacity supply agreement (CSA, investment support mechanism (ISM, and long-term power market (LPM. The interaction procedure of the planning of the power supply infrastructure development has been described. The mechanism connecting the state sectoral and regional planning and corporate planning of power supply infrastructure development has been proposed. The regional aspects of industrial policy and its legislative support have been considered. To successfully implement the public-private-partnership (PPP projects, it is necessary to create the effective PPP model within the federal and regional legislation framework; to develop the financial model providing the recoverability of investments; to provide a mutually beneficial cooperation between executive bodies and private investors. The possibility to apply the PPP mechanism for regional

  5. Hospital development plans: a new tool to break ground for strategic thinking in Tanzanian hospitals.

    Science.gov (United States)

    Flessa, Steffen

    2005-12-01

    Tanzanian hospitals suffer from underfunding and poor management. In particular, planning and strategic thinking need improvement. Cultural values such as subordination, risk aversion, and high time preference, together with a long history of socialist government, result in lack of responsibility, accountability, and planning. This has been addressed by the health sector reform with its focus on decentralization, strengthened by the introduction of basket funding facilitated by the Comprehensive Council Health Plans. As a consequence of this the next logical step is to improve the authority of regional and district hospitals in the use of their resources by introducing hospital development plans. These strategic plans were introduced as tools of strategic planning in 2001 by the Kreditanstalt für Wiederaufbau in close collaboration with the Tanzanian Ministry of Health, binding the release of rehabilitation funds to presentation of a strategic hospital plan. This study examines the rationale and content of hospital development plans. Initial experiences are discussed. The quality of presented plans has steadily improved, but there is a tendency for hospitals with a close connection to development partners to present well prepared reports while other hospitals have severe problems fulfilling the requirements. For many hospitals it is in fact the first time that they have had to define their functions and future role, thus breaking ground for strategic thinking.

  6. A Study on the Research and Development planning of Nuclear Energy

    International Nuclear Information System (INIS)

    Won, Byung Chool; Song, S. H.; Kim, I. C.; Cheong, C. E.; Kim, H. J.; Paek, C. E.; Juh, S. J.

    2006-06-01

    This study conducted project planning to set new R and D paradigm regime. And the eight R and D fields are derived as follows: - Development of Nuclear Technology and Nuclear Commodity for Export - Development of Nuclear Hydrogen Production System - Development of Innovative Nuclear System - Establishment of Nuclear Safety System - Establishment of Nuclear Environment Management System - Development of Radiation Technology with High Added Value - Development of Neutron Science Technology - Development of Nuclear Fundamental and Common Technology

  7. Tracking the Short Term Planning (STP) Development Process

    Science.gov (United States)

    Price, Melanie; Moore, Alexander

    2010-01-01

    Part of the National Aeronautics and Space Administration?s mission is to pioneer the future in space exploration, scientific discovery and aeronautics research is enhanced by discovering new scientific tools to improve life on earth. Sequentially, to successfully explore the unknown, there has to be a planning process that organizes certain events in the right priority. Therefore, the planning support team has to continually improve their processes so the ISS Mission Operations can operate smoothly and effectively. The planning support team consists of people in the Long Range Planning area that develop timelines that includes International Partner?s Preliminary STP inputs all the way through to publishing of the Final STP. Planning is a crucial part of the NASA community when it comes to planning the astronaut?s daily schedule in great detail. The STP Process is in need of improvement, because of the various tasks that are required to be broken down in order to get the overall objective of developing a Final STP done correctly. Then a new project came along in order to store various data in a more efficient database. "The SharePoint site is a Web site that provides a central storage and collaboration space for documents, information, and ideas."

  8. Developing strategic plans for effective utilization of research reactors

    Energy Technology Data Exchange (ETDEWEB)

    Ridikas, Danas [International Atomic Energy Agency, Vienna (Austria). Dept. of Nuclear Sciences and Applications

    2015-12-15

    Strategic plans are indispensable documents for research reactors (RRs) to ensure their efficient, optimized and well managed utilization. A strategic plan provides a framework for increasing utilization, while helping to create a positive safety culture, a motivated staff, a clear understanding of real costs and a balanced budget. A strategic plan should be seen as an essential tool for a responsible manager of any RR, from the smallest critical facility to the largest reactor. Results and lessons learned are shown from the IAEA efforts to help the RR facilities developing strategic plans, provide review and advise services, organize national and regional stakeholder/user workshops, prepare further guidance and recommendations, document and publish guidance documents and other supporting materials.

  9. Developing strategic plans for effective utilization of research reactors

    International Nuclear Information System (INIS)

    Ridikas, Danas

    2015-01-01

    Strategic plans are indispensable documents for research reactors (RRs) to ensure their efficient, optimized and well managed utilization. A strategic plan provides a framework for increasing utilization, while helping to create a positive safety culture, a motivated staff, a clear understanding of real costs and a balanced budget. A strategic plan should be seen as an essential tool for a responsible manager of any RR, from the smallest critical facility to the largest reactor. Results and lessons learned are shown from the IAEA efforts to help the RR facilities developing strategic plans, provide review and advise services, organize national and regional stakeholder/user workshops, prepare further guidance and recommendations, document and publish guidance documents and other supporting materials.

  10. Development planning and appropriate technology: a dilemma and a proposal

    Energy Technology Data Exchange (ETDEWEB)

    Ellis, G.

    1981-03-01

    This paper examines the present system of project paper preparation and project planning used by the US Agency for International Development and many donor agencies. Three approaches for meeting the evident weaknesses of the system - a holistic approach to the planning problem, an operant-conditioning approach to implementation, and a process approach to planning and implementation - are presented and critiqued. On the basis of the critique, an approach grounded in a search for an approximately appropriate technology is supported; and a proposal for an appropriate-technology evaluation system which would analyze alternative technologies, deliver information to the field level, supply needed information on technologies and implementation, constrain donor planners, reduce lag time, incorporate evaluations into future planning, and reduce dependence upon planners is presented. 66 references.

  11. Language Planning and Development Aid: The (In)Visibility of Language in Development Aid Discourse

    Science.gov (United States)

    Taylor-Leech, Kerry; Benson, Carol

    2017-01-01

    Despite the essential role of local, regional, national and international languages in human development, there is little reference to language planning in development aid discourse. Beginning with definitions of development aid and language planning, the paper examines how the two were linked in pre- and post-colonial times, showing how language…

  12. Contribution to Quebec's economic development: Development plan 1993

    International Nuclear Information System (INIS)

    1992-01-01

    The activities of Hydro-Quebec are analyzed from the standpoint of their contribution to economic development and their support of regional development. The structuring effects of Hydro-Quebec's electricity supply activities are described, specifically the utility's role as an employer and an important agent of economic development by virtue of its purchasing power. The role played by research and development activities in the technological development of Quebec is discussed along with the contribution of those activities to new industrial developments. Finally, the impacts of electricity use on industrial development are considered. An analysis is presented of Hydro-Quebec's marketing activities and the options they afford. These marketing activities are aimed mainly at supporting economic development. The availability of reasonably priced electricity enhances the competitiveness of all industrial sectors, especially those for which electricity is a factor in siting. Furthermore, Hydro-Quebec can use its marketing activities to reinforce this comparative advantage. Hydro-Quebec can also support regional development by decentralizing operations, standardizing rates, and extending its marketing activities to the regions. 2 tabs

  13. Environmental restoration and waste management: Robotics technology development program: Robotics 5-year program plan

    International Nuclear Information System (INIS)

    1991-01-01

    This plan covers robotics Research, Development, Demonstration, Testing, activities in the Program for the next five years. These activities range from bench-scale R ampersand D to fullscale hot demonstrations at DOE sites. This plan outlines applications of existing technology to near-term needs, the development and application of enhanced technology for longer-term needs, and an initiation of advanced technology development to meet those needs beyond the five-year plan. The objective of the Robotic Technology Development (RTDP) is to develop and apply robotics technologies that will enable Environmental Restoration and Waste Management operations at DOE sites to be safer, faster and cheaper. Five priority DOE sites were visited in March 1990 to identify needs for robotics technology in ER ampersand WM operations. This 5-Year Program Plan for the RTDP detailed annual plans for robotics technology development based on identified needs. This 5-Year Program Plan discusses the overall approach to be adopted by the RTDP to aggressively develop robotics technology and contains discussions of the Program Management Plan, Site Visit and Needs Summary, Approach to Needs-Directed Technical Development, Application-Specific Technical Development, and Cross-Cutting and Advanced Technology. Integrating application-specific ER ampersand WM needs, the current state of robotics technology, and the potential benefits (in terms of faster, safer, and cheaper) of new technology, the Plan develops application-specific road maps for robotics RDDT ampersand E for the period FY 1991 through FY 1995. In addition, the Plan identifies areas where longer-term research in robotics will have a high payoff in the 5- to 20-year time frame. 12 figs

  14. Process development work plan for waste feed delivery system

    International Nuclear Information System (INIS)

    Papp, I.G.

    1998-01-01

    This work plan defines the process used to develop project definition for Waste Feed Delivery (WFD). Project definition provides the direction for development of definitive design media required for the ultimate implementation of operational processing hardware and software. Outlines for the major deliverables are attached as appendices. The implementation of hardware and software will accommodate requirements for safe retrieval and delivery of waste currently stored in Hanford's underground storage tanks. Operations and maintenance ensure the availability of systems, structures, and components for current and future planned operations within the boundary of the Tank Waste Remediation System (TWRS) authorization basis

  15. A systematic process for developing and assessing accident management plans

    International Nuclear Information System (INIS)

    Hanson, D.J.; Blackman, H.S.; Meyer, O.R.; Ward, L.W.

    1991-04-01

    This document describes a four-phase approach for developing criteria recommended for use in assessing the adequacy of nuclear power plant accident management plans. Two phases of the approach have been completed and provide a prototype process that could be used to develop an accident management plan. Based on this process, a preliminary set of assessment criteria are derived. These preliminary criteria will be refined and improved when the remaining steps of the approach are completed, that is, after the prototype process is validated through application. 9 refs., 10 figs., 7 tabs

  16. Automated high-dose rate brachytherapy treatment planning for a single-channel vaginal cylinder applicator

    Science.gov (United States)

    Zhou, Yuhong; Klages, Peter; Tan, Jun; Chi, Yujie; Stojadinovic, Strahinja; Yang, Ming; Hrycushko, Brian; Medin, Paul; Pompos, Arnold; Jiang, Steve; Albuquerque, Kevin; Jia, Xun

    2017-06-01

    High dose rate (HDR) brachytherapy treatment planning is conventionally performed manually and/or with aids of preplanned templates. In general, the standard of care would be elevated by conducting an automated process to improve treatment planning efficiency, eliminate human error, and reduce plan quality variations. Thus, our group is developing AutoBrachy, an automated HDR brachytherapy planning suite of modules used to augment a clinical treatment planning system. This paper describes our proof-of-concept module for vaginal cylinder HDR planning that has been fully developed. After a patient CT scan is acquired, the cylinder applicator is automatically segmented using image-processing techniques. The target CTV is generated based on physician-specified treatment depth and length. Locations of the dose calculation point, apex point and vaginal surface point, as well as the central applicator channel coordinates, and the corresponding dwell positions are determined according to their geometric relationship with the applicator and written to a structure file. Dwell times are computed through iterative quadratic optimization techniques. The planning information is then transferred to the treatment planning system through a DICOM-RT interface. The entire process was tested for nine patients. The AutoBrachy cylindrical applicator module was able to generate treatment plans for these cases with clinical grade quality. Computation times varied between 1 and 3 min on an Intel Xeon CPU E3-1226 v3 processor. All geometric components in the automated treatment plans were generated accurately. The applicator channel tip positions agreed with the manually identified positions with submillimeter deviations and the channel orientations between the plans agreed within less than 1 degree. The automatically generated plans obtained clinically acceptable quality.

  17. Development Plan of the Sub sector Coal 1997, 2005

    International Nuclear Information System (INIS)

    1996-11-01

    This third version of the Development Plan of the Sub-sector Coal, subsequent to the editions of 1994 and 1995, it not only obeys the initial purpose of upgrading the plan annually, but to that, there being it conceived from a principle as an indicative and dynamic plan, they have happened circumstances, such as new laws and regulations, changes in the national and international market, variations in the energy politics of the country and other that force to their upgrade. The plan, although it maintains the general structure of the previous versions, fixed as planning Bureau horizon the year 2005, and it contemplates some actions to advance on the part of the State, represented by Ecocarbon. They settle down this way, strategic objectives for each one of their programs that they should be translated in the achievement of the end enunciated in the precedent paragraph. As the achievement of the auto- sustainability of the mining in the proposed term cannot be reached without the participation and the commitment of the private sector that it is the main actor in the development of the industry, the plan it includes an agreement of commitment, signed by authorized representatives guided to the achievement of the looked for objective. It is clear that, to reach the enunciated objective, a permanent evaluation of the goals, the planning bureau of the sub-sector is needed it should stay, looking for the participation of the carboniferous private sector to reach a progressive development of the mining of the coal and of the industry in general

  18. A study on the planning for the research and development of nuclear energy

    International Nuclear Information System (INIS)

    Noh, Byong Chull; Won, B. C.; Bang, J. K.; Jung, Y. H.; Kim, M. R.; Cho, C. Y.; Lee, H. S.; Kim, J. U.; Yeo, J. W.; Hong, Y. P.; Kim, I. C.; Rha, K. H.; Yoon, Y. S.; Park, J. H.; Ko, Y. S.; Kim, S. S.; Kang, W. J.; Lee, Y. H.; Shim, H. W.

    1997-01-01

    This study has performed aiming to provide the government with the basic input to establish 'the comprehensive promotion plan for utilization, research and development of nuclear energy' and 'the mid- and long-term nuclear research and development program', thus the government set it up as a national plan after endorsement of Atomic Energy Commission. Next, the feasibility study of the proton accelerators construction which is expected to use for nuclear research and development and industry. And a systematic and integrated research and development management system for the large-scale projects has been studied considering the inherent uncertainty and high risk of research and development. (author). 24 tabs., 6 figs

  19. Development of 3-D Radiosurgery Planning System Using IBM Personal Computer

    International Nuclear Information System (INIS)

    Suh, Tae Suk; Park, Charn Il; Ha, Sung Whan; Kang, Wee Saing; Suh, Doug Young; Park, Sung Hun

    1993-01-01

    Recently, stereotactic radiosurgery plan is required with the information of 3-D image and dose distribution. A project has been doing if developing LINAC based stereotactic radiosurgery since April 1991. The purpose of this research is to develop 3-D radiosurgery planning system using personal computer. The procedure of this research is based on two steps. The first step is to develop 3-D localization system, which input the image information of the patient, coordinate transformation, the position and shape of target, and patient contour into computer system using CT image and stereotactic frame. The second step is to develop 3-D dose planning system, which compute dose distribution on image plane, display on high resolution monitor both isodose distribution and patient image simultaneously and develop menu-driven planning system. This prototype of radiosurgery planning system was applied recently for several clinical cases. It was shown that our planning system is fast, accurate and efficient while making it possible to handle various kinds of image modalities such as angiography, CT and MRI. It makes it possible to develop general 3-D planning system using beam eye view or CT simulation in radiation therapy in future

  20. Development of short Indonesian lesson plan to improve teacher performance

    Science.gov (United States)

    Yulianto, B.; Kamidjan; Ahmadi, A.; Asteria, P. V.

    2018-01-01

    The developmental research was motivated by the results of preliminary study through interviews, which revealed almost all of the teachers did not create lesson plan themselves. As a result of this load, the performance of the real learning in the classroom becomes inadequate. Moreover, when lesson plan was not made by teachers themselves, the learning process becomes ineffective. Therefore, this study designed to develop a prototype of the short lesson plan, in particular, Indonesian language teaching, and to investigate its effectiveness. The participants in the study were teachers who were trained through lesson study group to design short model’s lesson plan. Questionnaires and open-ended questions were used, and the quantitative and qualitative data obtained were analyzed accordingly. The analysis of the quantitative data, aided with SPSS, were frequency, percentage, and means, whereas the qualitative data were analyzed descriptively. The results showed that the teachers liked the model, and they were willing to design their own lesson plan. The observation data revealed that the classroom learning process became more interactive, and classroom atmosphere was more engaging and natural because the teachers did not stick to the lesson plan made by other teachers.

  1. National rf technology research and development program plan

    International Nuclear Information System (INIS)

    1983-05-01

    This plan was prepared by the Oak Ridge National Laboratory at the request of the Office of Fusion Energy, Division of Development and Technology, to define the technology development needs and priorities. The US rf research and development community, with a wide representation from universities, laboratories and industries, participated in many discussions, meetings and in a three-day workshop in developing the needs and priorities definition. This very active and effective involvement of the rf leaders from all of these groups was an essential feature of the activity and results in the plan representing a broad consensus from the magnetic fusion energy development community. In addition, a number of scientists from Japan and Europe participated by providing data

  2. Assessments for high dose radionuclide therapy treatment planning

    International Nuclear Information System (INIS)

    Fisher, D.R.

    2003-01-01

    Advances in the biotechnology of cell specific targeting of cancer and the increased number of clinical trials involving treatment of cancer patients with radiolabelled antibodies, peptides, and similar delivery vehicles have led to an increase in the number of high dose radionuclide therapy procedures. Optimised radionuclide therapy for cancer treatment is based on the concept of absorbed dose to the dose limiting normal organ or tissue. The limiting normal tissue is often the red marrow, but it may sometimes be the lungs, liver, intestinal tract, or kidneys. Appropriate treatment planning requires assessment of radiation dose to several internal organs and tissues, and usually involves biodistribution studies in the patient using a tracer amount of radionuclide bound to the targeting agent and imaged at sequential timepoints using a planar gamma camera. Time-activity curves are developed from the imaging data for the major organ tissues of concern, for the whole body and sometimes for selected tumours. Patient specific factors often require that dose estimates be customised for each patient. In the United States, the Food and Drug Administration regulates the experimental use of investigational new drugs and requires 'reasonable calculation of radiation absorbed dose to the whole body and to critical organs' using the methods prescribed by the Medical Internal Radiation Dose (MIRD) Committee of the Society of Nuclear Medicine. Review of high dose studies shows that some are conducted with minimal dosimetry, that the marrow dose is difficult to establish and is subject to large uncertainties. Despite the general availability of software, internal dosimetry methods often seem to be inconsistent from one clinical centre to another. (author)

  3. Elaboration of technology organizational models of constructing high-rise buildings in plans of construction organization

    Science.gov (United States)

    Osipenkova, Irina; Simankina, Tatyana; Syrygina, Taisiia; Lukinov, Vitaliy

    2018-03-01

    This article represents features of the elaboration of technology organizational models of high-rise building construction in technology organizational documentation on the example of the plan of construction organization. Some examples of enhancing the effectiveness of high-rise building construction based on developments of several options of the organizational and technological plan are examined. Qualitative technology organizational documentation allows to increase the competitiveness of construction companies and provides prime cost of construction and assembly works reductions. Emphasis is placed on the necessity to comply with the principle of comprehensiveness of engineering, scientific and research works, development activities and scientific and technical support.

  4. 77 FR 15701 - Highly Migratory Species; 2006 Consolidated Highly Migratory Species Fishery Management Plan...

    Science.gov (United States)

    2012-03-16

    ... Species Fishery Management Plan; Amendment 4 AGENCY: National Marine Fisheries Service (NMFS), National.... SUMMARY: This fishery management plan (FMP) amendment addresses Atlantic highly migratory species (HMS... to create an HMS Caribbean Small Boat Commercial Permit (CSBP) allowing fishing for and sales of...

  5. The challenge of sustainable mobility in urban planning and development

    DEFF Research Database (Denmark)

    Xue, Jin; Næss, Petter; Yao, Yinmei

    2011-01-01

    The theme of this article is how the challenge of sustainable mobility has been dealt with in urban planning and urban development in the metropolitan areas of Copenhagen (Denmark) and Hangzhou (China). The two metropolises have followed different trajectories in their land use and transport...

  6. Peru 2021: A Business Plan for National Development.

    Science.gov (United States)

    Caravedo, Baltazar

    1998-01-01

    Describes Peru 2021, an organization of business-related individuals with a vision for Peruvian society. Outlines aspects of their vision in the areas of leadership, education, economy, environment, government, business, technology, and society. Discusses Peru 2021's efforts to develop a strategic plan for implementing the vision, to involve…

  7. Phased project planning and development in anticipation of operational programs

    Science.gov (United States)

    Stroud, W. G.

    1973-01-01

    The impact of future operational status on the planning and execution of the research and development activities for major space flight projects is assessed. These projects, within NASA, are part of the Applications Program involving communications and meteorology. The NASA management approach to these projects is determined by national policies governing the responsibilities and relationships among the various government agencies and private industries.

  8. Towards an Intelligent Planning Knowledge Base Development Environment

    Science.gov (United States)

    Chien, S.

    1994-01-01

    ract describes work in developing knowledge base editing and debugging tools for the Multimission VICAR Planner (MVP) system. MVP uses artificial intelligence planning techniques to automatically construct executable complex image processing procedures (using models of the smaller constituent image processing requests made to the JPL Multimission Image Processing Laboratory.

  9. Metis Hub: The Development of an Intuitive Project Planning System

    Energy Technology Data Exchange (ETDEWEB)

    McConnell, Rachael M. [Oregon State Univ., Corvallis, OR (United States); Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2015-08-26

    The goal is to develop an intuitive, dynamic, and consistent interface for the Metis Planning System by combining user requirements and human engineering concepts. The system is largely based upon existing systems so some tools already have working models that we can follow. However, the web-based interface is completely new.

  10. Secondary Education Development Plan (SEDP) and the provision ...

    African Journals Online (AJOL)

    This article examines the status of school library service provision after the establishment of the Secondary Education Development Plan (SEDP) in Sumbawanga Municipality, Tanzania. Data were collected through questionnaires, interviews and observation from four secondary schools. Findings show that the surveyed ...

  11. Language Planning, English Language Education and Development Aid in Bangladesh

    Science.gov (United States)

    Erling, Elizabeth J.

    2017-01-01

    The increased status of English as the language of international communication and business has meant that development aid has increasingly been used to finance language planning initiatives aimed at improving and/or expanding English language education. The intended outcome of this aid is often to provide expanded economic returns and…

  12. Comments on "Women, Development Planning and Government Policies in Pakistan".

    Science.gov (United States)

    Hafeez, S

    1992-01-01

    Commentary on Shahnaz and Bilquees Raza's paper on women in development in Pakistan is supportive of the content analysis of the Sixth and Seventh 5-Year Plans and policies, but critical of the methods used n the analysis. The parallel to survey research methods was made in that there was a specification of 1) the unit of analysis (reference to each policy measure, each chapter, each page of the plan), 2) the rationale for the plan, 3) specific objectives of the examination, and 4) the criteria for analysis. Missing also was the identification of policy trends from the Fourth and Fifth 5-Year Plans. The question is never answered as to why gender issues were not directed to the agricultural sector. The conclusion that there was a hugh gap between intentions and implementation was an issue not unique to women's issues, and a deeper analysis may have been required in order to understand the nature and magnitude of the gaps for women's policies and their productive roles. Questions should have been directed to the issues of the root causes of gaps in planning and implementation of policies and programs for women in development, and the identification of quantitative and qualitative indicators of gaps. Questions arise as to whether the gaps have changed with changes in the strength of political and social will in various decades. Recognition was given by the authors to the low budget allocations between 1955 and 1970 to education and health which affected both men and women, but there was scant mention of the strong social, not political, will to enhance women's welfare prevalent at this time. Information was lacking on the differences between the Sixth and Seventh sectoral plans for agricultural employment and women and the working groups plans that did include women in agricultural employment; the question is why the working plans were not incorporated into the final plans, and why the working groups did not protest this omission. The lack of political and social

  13. R+D works for the further development of high temperature reactors. Development and testing of a pilot blower with magnetic bearings. Phase 1 - plans ready for construction. Phase 2 - construction and testing

    International Nuclear Information System (INIS)

    1991-01-01

    The development of helium compressors in magnetic bearings as cooling blowers for HTR's made a considerable contribution to the extension of Germany's technical potential. Magnetic bearings open up new possibilities with simultaneous savings due to the reduction in friction and wear. With the use of active magnetic bearings for cooling gas blowers any potential contamination of the primary circuit by oil is completely excluded. The oil system is omitted and therefore so are a large number of safety requirements and technical layout conditions. The keywords here are: safe inclusion of radio-activity, fire and explosion protection, omission of oil plant spatially separated but necessarily close to the blowers and the reactor, omission of removal of used bearing oil from the primary area. One would expect that the dynamic rotor properties of blower shafts with magnetic bearings are better than those with oil bearings, as bearing damping can be provided in the region of critical speeds. (orig./GL) [de

  14. Developing Cloud Chambers with High School Students

    Science.gov (United States)

    Ishizuka, Ryo; Tan, Nobuaki; Sato, Shoma; Zeze, Syoji

    The result and outcome of the cloud chamber project, which aims to develop a cloud chamber useful for science education is reported in detail. A project includes both three high school students and a teacher as a part of Super Science High School (SSH) program in our school. We develop a dry-ice-free cloud chamber using salt and ice (or snow). Technical details of the chamber are described. We also argue how the project have affected student's cognition, motivation, academic skills and behavior. The research project has taken steps of professional researchers, i.e., in planning research, applying fund, writing a paper and giving a talk in conferences. From interviews with students, we have learnt that such style of scientific activity is very effective in promoting student's motivation for learning science.

  15. Cumulative effects of planned industrial development and climate change on marine ecosystems

    Directory of Open Access Journals (Sweden)

    Cathryn Clarke Murray

    2015-07-01

    Full Text Available With increasing human population, large scale climate changes, and the interaction of multiple stressors, understanding cumulative effects on marine ecosystems is increasingly important. Two major drivers of change in coastal and marine ecosystems are industrial developments with acute impacts on local ecosystems, and global climate change stressors with widespread impacts. We conducted a cumulative effects mapping analysis of the marine waters of British Columbia, Canada, under different scenarios: climate change and planned developments. At the coast-wide scale, climate change drove the largest change in cumulative effects with both widespread impacts and high vulnerability scores. Where the impacts of planned developments occur, planned industrial and pipeline activities had high cumulative effects, but the footprint of these effects was comparatively localized. Nearshore habitats were at greatest risk from planned industrial and pipeline activities; in particular, the impacts of planned pipelines on rocky intertidal habitats were predicted to cause the highest change in cumulative effects. This method of incorporating planned industrial development in cumulative effects mapping allows explicit comparison of different scenarios with the potential to be used in environmental impact assessments at various scales. Its use allows resource managers to consider cumulative effect hotspots when making decisions regarding industrial developments and avoid unacceptable cumulative effects. Management needs to consider both global and local stressors in managing marine ecosystems for the protection of biodiversity and the provisioning of ecosystem services.

  16. Developing a successful marketing plan for HELP JSC

    OpenAIRE

    Nguyen, Ke Tuong

    2010-01-01

    Health care has become an extremely important issue during the economic development. Vietnamese rapid population growth has made the service sector become overloaded. Majority of people are absorbed at work and neither do take care of their health nor do have a proper health care programme. HELP, a health care service company, has discovered general ideas of its services: brings health, joy and happiness to people. It is no later than now to develop a marketing plan, which can enhance the bu...

  17. Geochemical Testing And Model Development - Residual Tank Waste Test Plan

    International Nuclear Information System (INIS)

    Cantrell, K.J.; Connelly, M.P.

    2010-01-01

    This Test Plan describes the testing and chemical analyses release rate studies on tank residual samples collected following the retrieval of waste from the tank. This work will provide the data required to develop a contaminant release model for the tank residuals from both sludge and salt cake single-shell tanks. The data are intended for use in the long-term performance assessment and conceptual model development.

  18. Vitrification development plan for US Department of Energy mixed wastes

    International Nuclear Information System (INIS)

    Peters, R.; Lucerna, J.; Plodinec, M.J.

    1993-10-01

    This document is a general plan for conducting vitrification development for application to mixed wastes owned by the US Department of Energy. The emphasis is a description and discussion of the data needs to proceed through various stages of development. These stages are (1) screening at a waste site to determine which streams should be vitrified, (2) waste characterization and analysis, (3) waste form development and treatability studies, (4) process engineering development, (5) flowsheet and technical specifications for treatment processes, and (6) integrated pilot-scale demonstration. Appendices provide sample test plans for various stages of the vitrification development process. This plan is directed at thermal treatments which produce waste glass. However, the study is still applicable to the broader realm of thermal treatment since it deals with issues such as off-gas characterization and waste characterization that are not necessarily specific to vitrification. The purpose is to provide those exploring or considering vitrification with information concerning the kinds of data that are needed, the way the data are obtained, and the way the data are used. This will provide guidance to those who need to prioritize data needs to fit schedules and budgets. Knowledge of data needs also permits managers and planners to estimate resource requirements for vitrification development

  19. Software development to support decommissioning and waste management strategic planning

    International Nuclear Information System (INIS)

    Williams, John; Warneford, Ian; Harrison, J.

    1997-01-01

    One of the components of the UKAEA's mission is to care for and, at the appropriate time, safely dismantle its radioactive facilities which are no longer in use. To assist in the development of an optimised strategy, AEA Technology was commissioned to produce decision support software. This paper describes the background to the development of the software, its key features and current status, and the lessons learnt during the development. The software, known as UKAEA SPS (Strategic Planning System), is a unique support software package that has been developed to assist in the planning of decommissioning and radioactive waste management. SPS models linked decommissioning and waste management strategies covering all of UKAEA's nuclear liabilities. It has been developed around the database package ACCESS, and runs on Pentium PCs; however, it has many of the features of project planning systems. Its principal outputs are costs, timings and utilisation data for the waste stores, processing facilities, transport and disposal operations displayed at any level of aggregation. This allows programme managers to see easily the effects of changing key parameters in a strategy under development. (author)

  20. Proposed Hydro-Quebec development plan, 1993: Proposal

    International Nuclear Information System (INIS)

    1992-01-01

    The Quebec government now requires Hydro-Quebec to submit a development plan every three years instead of annually, in order to permit more in-depth studies and a broader consultation with interested parties. In the first of such three-year plans, a series of plan proposals is presented which was developed after a year of consultation with various groups on four fundamental matters: energy efficiency, means of generation, electro-intensive industries, and electricity exports. Options for meeting future demand at Hydro-Quebec are assessed, including the construction of new generation and transmission facilities, rehabilitation of existing facilities, improving electrical energy efficiency, and conservation strategies. These options are considered while applying the principle of sustainable development that respects the environment. Hydroelectricity will continue to be emphasized as the main source of generation since hydroelectric facilities offer distinct advantages in terms of costs, environmental impacts, and economic spinoffs. The proposed plan also presents objectives and strategies for improving the quality of service and internal operations. Financial forecasts for Hydro-Quebec are proposed which take into account the forecast changes in the utility's cost and revenue factors and its self-financing requirements. 5 figs., 15 tabs

  1. Radioactive Waste Management Research Program Plan for high-level waste: 1987

    International Nuclear Information System (INIS)

    1987-05-01

    This plan will identify and resolve technical and scientific issues involved in the NRC's licensing and regulation of disposal systems intended to isolate high level hazardous radioactive wastes (HLW) from the human environment. The plan describes the program goals, discusses the research approach to be used, lays out peer review procedures, discusses the history and development of the high level radioactive waste problem and the research effort to date and describes study objectives and research programs in the areas of materials and engineering, hydrology and geochemistry, and compliance assessment and modeling. The plan also details the cooperative interactions with international waste management research programs. Proposed Earth Science Seismotectonic Research Program plan for radioactive waste facilities is appended

  2. Development of planning methods for demand-side management (DSM)

    International Nuclear Information System (INIS)

    Kaerkkaeinen, S.; Kekkonen, V.; Rissanen, P.

    1995-01-01

    The interest of utilities and governmental agencies in Demand-side management (IDSM) and Integrated Resource Planning (IRP) has increased during recent years also in Finland. From the governmental point of view, the main reason for this has been concern about the environmental effects of electricity supply and consumption. Utilities are mainly interested in cost reductions in electricity supply and distribution caused by DSM. Also improved service to the customer due to DSM has increasing value to utilities. In this project, the main target has been to develop and assess methods for DSM planning from the utility point of view. The final goal is to integrate these methods into the strategic planning of electric utilities

  3. SU-G-TeP1-05: Development and Clinical Introduction of Automated Radiotherapy Treatment Planning for Prostate Cancer

    International Nuclear Information System (INIS)

    Winkel, D; Bol, GH; Asselen, B van; Hes, J; Scholten, V; Kerkmeijer, LGW; Raaymakers, BW

    2016-01-01

    Purpose: To develop an automated radiotherapy treatment planning and optimization workflow for prostate cancer in order to generate clinical treatment plans. Methods: A fully automated radiotherapy treatment planning and optimization workflow was developed based on the treatment planning system Monaco (Elekta AB, Stockholm, Sweden). To evaluate our method, a retrospective planning study (n=100) was performed on patients treated for prostate cancer with 5 field intensity modulated radiotherapy, receiving a dose of 35×2Gy to the prostate and vesicles and a simultaneous integrated boost of 35×0.2Gy to the prostate only. A comparison was made between the dosimetric values of the automatically and manually generated plans. Operator time to generate a plan and plan efficiency was measured. Results: A comparison of the dosimetric values show that automatically generated plans yield more beneficial dosimetric values. In automatic plans reductions of 43% in the V72Gy of the rectum and 13% in the V72Gy of the bladder are observed when compared to the manually generated plans. Smaller variance in dosimetric values is seen, i.e. the intra- and interplanner variability is decreased. For 97% of the automatically generated plans and 86% of the clinical plans all criteria for target coverage and organs at risk constraints are met. The amount of plan segments and monitor units is reduced by 13% and 9% respectively. Automated planning requires less than one minute of operator time compared to over an hour for manual planning. Conclusion: The automatically generated plans are highly suitable for clinical use. The plans have less variance and a large gain in time efficiency has been achieved. Currently, a pilot study is performed, comparing the preference of the clinician and clinical physicist for the automatic versus manual plan. Future work will include expanding our automated treatment planning method to other tumor sites and develop other automated radiotherapy workflows.

  4. Geospatial Based Information System Development in Public Administration for Sustainable Development and Planning in Urban Environment

    OpenAIRE

    Georgios N. Kouziokas

    2016-01-01

    It is generally agreed that the governmental authorities should actively encourage the development of an efficient framework of information and communication technology initiatives so as to advance and promote sustainable development and planning strategies. This paper presents a prototype Information System for public administration which was designed to facilitate public management and decision making for sustainable development and planning. The system was developed by using several progra...

  5. Technology development for high temperature logging tools

    Energy Technology Data Exchange (ETDEWEB)

    Veneruso, A.F.; Coquat, J.A.

    1979-01-01

    A set of prototype, high temperature logging tools (temperature, pressure and flow) were tested successfully to temperatures up to 275/sup 0/C in a Union geothermal well during November 1978 as part of the Geothermal Logging Instrumentation Development Program. This program is being conducted by Sandia Laboratories for the Department of Energy's Division of Geothermal Energy. The progress and plans of this industry based program to develop and apply the high temperature instrumentation technology needed to make reliable geothermal borehole measurements are described. Specifically, this program is upgrading existing sondes for improved high temperature performance, as well as applying new materials (elastomers, polymers, metals and ceramics) and developing component technology such as high temperature cables, cableheads and electronics to make borehole measurements such as formation temperature, flow rate, high resolution pressure and fracture mapping. In order to satisfy critical existing needs, the near term goal is for operation up to 275/sup 0/C and 7000 psi by the end of FY80. The long term goal is for operation up to 350/sup 0/C and 20,000 psi by the end of FY84.

  6. Development of high-capacity antimatter storage

    International Nuclear Information System (INIS)

    Howe, Steven D.; Smith, Gerald A.

    2000-01-01

    Space is vast. Over the next few decades, humanity will strive to send probes farther and farther into space to establish long baselines for interferometry, to visit the Kuiper Belt, to identify the heliopause, or to map the Oort cloud. In order to solve many of the mysteries of the universe or to explore the solar system and beyond, one single technology must be developed--high performance propulsion. In essence, future missions to deep space will require specific impulses between 50,000 and 200,000 seconds and energy densities greater than 10 14 j/kg in order to accomplish the mission within the career lifetime of an individual, 40 years. Only two technologies available to mankind offer such performance--fusion and antimatter. Currently envisioned fusion systems are too massive. Alternatively, because of the high energy density, antimatter powered systems may be relatively compact. The single key technology that is required to enable the revolutionary concept of antimatter propulsion is safe, reliable, high-density storage. Under a grant from the NASA Institute of Advanced Concepts, we have identified two potential mechanisms that may enable high capacity antimatter storage systems to be built. We will describe planned experiments to verify the concepts. Development of a system capable of storing megajoules per gram will allow highly instrumented platforms to make fast missions to great distances. Such a development will open the universe to humanity

  7. A Model for Physician Leadership Development and Succession Planning.

    Science.gov (United States)

    Dubinsky, Isser; Feerasta, Nadia; Lash, Rick

    2015-01-01

    Although the presence of physicians in formal leadership positions has often been limited to roles of department chiefs, MAC chairs, etc., a growing number of organizations are recruiting physicians to other leadership positions (e.g., VP, CEO) where their involvement is being genuinely sought and valued. While physicians have traditionally risen to leadership positions based on clinical excellence or on a rotational basis, truly effective physician leadership that includes competencies such as strategic planning, budgeting, mentoring, network development, etc., is essential to support organizational goals, improve performance and overall efficiency as well as ensuring the quality of care. In this context, the authors have developed a physician leader development and succession planning matrix and supporting toolkit to assist hospitals in identifying and nurturing the next generation of physician leaders.

  8. Long term plan of atomic energy development and utilization

    International Nuclear Information System (INIS)

    1982-01-01

    The atomic energy utilization and development in Japan have progressed remarkably, and already nuclear power generation has borne an important part in electric power supply, while radiation has been utilized in the fields of industry, agriculture, medicine and so on. Now, atomic energy is indispensable for national life and industrial activity. The former long term plan was decided in September, 1978, and the new long term plan should be established since the situation has changed largely. The energy substituting for petroleum has been demanded, and the expectation to nuclear power generation has heightened because it enables stable and economical power supply. The independently developed technology related to atomic energy must be put in practical use. The peaceful utilization of atomic energy must be promoted, while contributing to the nuclear non-proliferation policy. The Atomic Energy Commission of Japan decided the new long term plan to clearly show the outline of the important measures related to atomic energy development and utilization in 10 years hereafter, and the method of its promotion. The basic concept of atomic energy development and utilization, the long term prospect and the concept on the promotion, the method of promoting the development and utilization, and the problems of funds, engineers and location are described. (kako, I.)

  9. Planning of community heating systems modernization and development

    International Nuclear Information System (INIS)

    Mroz, Tomasz M.

    2008-01-01

    New approach to community heating systems modernization and development planning process has been proposed. It is based on the general decision making aid algorithm. The proposed algorithm takes into account both demand and supply side of community heat market modernization and development. The first step of algorithm - analytical step, refers to data base creation, which is needed for the description of community heating system energy, ecology and economic characteristics. Analysis of those characteristics allows for the identification of heating system market modernization and development potential scenarios. The second algorithm step - decision step, allows for the identification of the most compromise scenarios of system modernization and development. To make the planning process more transparent and to increase the influence of decision makers on the planning process the ELECTRE III method was chosen as the tool of decision aid. The ELECTRE III method is based on the construction of outranking relation and definition of pseudo-criterion. The iteration mode of method application allows the decision maker and analyst for the investigation of the sensitivity of final solution to the changing preference model. One of the methods of statistics - the creditability of mean range method was used for the determination of initial definition of pseudo-criterion. Proposed algorithm and decision aid method were employed for the case study analysis referring to the choice of the heating system for new developing urban area. (author)

  10. Plans, Patterns, and Move Categories Guiding a Highly Selective Search

    Science.gov (United States)

    Trippen, Gerhard

    In this paper we present our ideas for an Arimaa-playing program (also called a bot) that uses plans and pattern matching to guide a highly selective search. We restrict move generation to moves in certain move categories to reduce the number of moves considered by the bot significantly. Arimaa is a modern board game that can be played with a standard Chess set. However, the rules of the game are not at all like those of Chess. Furthermore, Arimaa was designed to be as simple and intuitive as possible for humans, yet challenging for computers. While all established Arimaa bots use alpha-beta search with a variety of pruning techniques and other heuristics ending in an extensive positional leaf node evaluation, our new bot, Rat, starts with a positional evaluation of the current position. Based on features found in the current position - supported by pattern matching using a directed position graph - our bot Rat decides which of a given set of plans to follow. The plan then dictates what types of moves can be chosen. This is another major difference from bots that generate "all" possible moves for a particular position. Rat is only allowed to generate moves that belong to certain categories. Leaf nodes are evaluated only by a straightforward material evaluation to help avoid moves that lose material. This highly selective search looks, on average, at only 5 moves out of 5,000 to over 40,000 possible moves in a middle game position.

  11. A New Method for Local Energy Planning in Developing Countries

    International Nuclear Information System (INIS)

    Van Beeck, N.

    2001-01-01

    Energy planning is an essential tool in the economic development of industrialized as well as developing countries. Energy planning in this paper is restricted to the selection of new energy systems for the production of proper energy forms in order to meet increased energy demand. This demand is actually the desire for certain energy services, which are the starting point of the new decision support method for local energy planning presented in this paper. In the decision making process concerning energy planning at the local level it is important to include context-related issues because the context determines for a large part the viability of the technologies or systems used. The context, in turn, is represented by the aims of the relevant actors, which are translated into measurable indicators to compare the different options. The impact assessment must allow for inclusion of all the indicators, either quantitative or qualitative in order to find the most appropriate technology for a region rather than the technically best or economically most optimal one. Appropriateness is defined by the context and is thus case specific, but the framework described in this paper is generally applicable within the given limitations. Note that the new method described in this paper is a decision support tool, implying that it does not decide for the energy planner which actions to take. The ultimate decision must be made by the planners themselves

  12. Low Impact Development Intensive Rural Construction Planning in Xu Fu Village Ningbo, China: Planning Review through Rural Resilience Perspective

    Directory of Open Access Journals (Sweden)

    Roosmayri Lovina Hermaputi

    2017-08-01

    Full Text Available Xu Fu Village Ningbo LID Intensive Rural Construction Planning is a cooperation project between Zhejiang University and Ningbo Institute of Technology which named "12th Five-Year National Science and Technology support program-the comprehensive demonstration of the key technology of the beautiful rural construction in the rapid urbanization area of the Yangtze River Delta". This plan focuses on intensive rural construction as part of rural development and construction project that applies the principles of low impact development. Xu Fu Village located in the Yangtze River Delta Region. Currently, the rural growth brings the high impact of development, as a result of rapid urbanization growth arising several issues, such as low land use efficiency, dispersed rural residence, homestead occupies more, rural roads covering over, etc. Meanwhile, Xu Fu village wishes to develop its tourism potential. Thus, the intensive rural construction should be done to avoid the severe effect. The project result hopefully can improve the quality and level of rural residential planning, design, and construction; improve their living environment; save construction land and water use; and improve energy efficiency. The aim of this study is to review the Low Impact Development (LID Intensive Rural Construction in Xu Fu Village, Ningbo City through the rural resilience perspective. This paper will describe the project plan first, then review it through rural resilience perspective. This paper will elaborate the rural resilience theory and then review the rural resiliency through two parts; the first part is identifying rural resilience in rural infrastructure development based on the criteria created by Ayyob S. and Yoshiki Y. (2014, about urban resiliency criteria, and then the second part is reviewing Xu Fu Village resilience through Arup Resilience Qualities (2012, considering three rural resilience domain (economy, ecology, and cultural.

  13. Strategy and Development Plan Strategy and Development Plan of Croatian Transport and Economic System ...

    Directory of Open Access Journals (Sweden)

    Ivan Miloš

    2005-11-01

    Full Text Available The Republic of Croatia, as well as many transition countries,is facing a number of difficulties in the field of transport,economy, foreign trade and foreign exchange transactions, externaland internal debt, social policy, demography, etc. In orderto solve these extremely complex problems it is necessary todetermine a strategy and an implementation plan of special instrumentsincluded in the state economic policy of the developmentof transport and economy. Until now the results haveshown that the implementation of conventional instrumentscannot lead to satisfactory results. One of the instruments of thecentral state economic policy - recognised internationally andmost frequently used instruments for solving the mentionedproblems without state investment and state risk - is the instituteof "Free Zone". The aim of this work is to help governmentauthorities and bodies to accept possibly quicker and more efficientsolutions to the actual problems by elaborating special instrumentsof state transport and economic policy and by proposingmeasures for their implementation in the Republic ofCroatia. Moreover, it invites professionals and scientists to contributethrough their expert knowledge in finding out new solutions.

  14. High-Poverty Urban High School Students' Plans for Higher Education: Weaving Their Own Safety Nets

    Science.gov (United States)

    Cilesiz, Sebnem; Drotos, Stephanie M.

    2016-01-01

    This qualitative study investigates high-poverty urban high school students' views of and plans regarding higher education, using Bourdieu's theory of reproduction in education as theoretical framework. Interview data from 76 students from six high-poverty urban schools in a metropolitan area in the Midwestern United States were analyzed using…

  15. Geospatial Based Information System Development in Public Administration for Sustainable Development and Planning in Urban Environment

    Science.gov (United States)

    Kouziokas, Georgios N.

    2016-09-01

    It is generally agreed that the governmental authorities should actively encourage the development of an efficient framework of information and communication technology initiatives so as to advance and promote sustainable development and planning strategies. This paper presents a prototype Information System for public administration which was designed to facilitate public management and decision making for sustainable development and planning. The system was developed by using several programming languages and programming tools and also a Database Management System (DBMS) for storing and managing urban data of many kinds. Furthermore, geographic information systems were incorporated into the system in order to make possible to the authorities to deal with issues of spatial nature such as spatial planning. The developed system provides a technology based management of geospatial information, environmental and crime data of urban environment aiming at improving public decision making and also at contributing to a more efficient sustainable development and planning.

  16. A Study on Planning Strategies for Urban Housing Block Development

    Institute of Scientific and Technical Information of China (English)

    Zeng Wei; Wang Hua; You Juanjuan; Wang Linlin; Li Caige

    2016-01-01

    As a city is the carrier of human society and housing is an important part of a citizen's life and survival,the citizens' choice of their housing mode will influence the material and spiritual life of the individuals,families,and society.In view of the diversification of values and investments,people are eager for a harmonious relationship between the community and the city.As a kind of compact and efficient housing mode,the housing block highlights the organic link of the community within the city in an open and shared living environment.This paper reviews the development of housing blocks in various countries and summarizes the characteristics of housing blocks through a comparison with traditional gated residential quarters and urban blocks.It then analyzes the current difficulties of housing block development in China from aspects such as the planning concept,planning system,management mode,and development mode and accordingly proposes planning principles and strategies in hope of providing theoretical supports for the development and construction of housing blocks in China.

  17. High Temperature Transparent Furnace Development

    Science.gov (United States)

    Bates, Stephen C.

    1997-01-01

    This report describes the use of novel techniques for heat containment that could be used to build a high temperature transparent furnace. The primary objective of the work was to experimentally demonstrate transparent furnace operation at 1200 C. Secondary objectives were to understand furnace operation and furnace component specification to enable the design and construction of a low power prototype furnace for delivery to NASA in a follow-up project. The basic approach of the research was to couple high temperature component design with simple concept demonstration experiments that modify a commercially available transparent furnace rated at lower temperature. A detailed energy balance of the operating transparent furnace was performed, calculating heat losses through the furnace components as a result of conduction, radiation, and convection. The transparent furnace shells and furnace components were redesigned to permit furnace operation at at least 1200 C. Techniques were developed that are expected to lead to significantly improved heat containment compared with current transparent furnaces. The design of a thermal profile in a multizone high temperature transparent furnace design was also addressed. Experiments were performed to verify the energy balance analysis, to demonstrate some of the major furnace improvement techniques developed, and to demonstrate the overall feasibility of a high temperature transparent furnace. The important objective of the research was achieved: to demonstrate the feasibility of operating a transparent furnace at 1200 C.

  18. An analytical framework for strategic delta planning : negotiating consent for long-term sustainable delta development

    NARCIS (Netherlands)

    Seijger, C.; Douven, W; Hermans, L.M.; Evers, J.; Phi, H. L.; Brunner, J.; Pols, L.; Ligtvoet, W.; Koole, S.; Slager, K.; Vermoolen, M.S.; Hasan, S.; Hoang, V. T M; van Halsema, G

    2016-01-01

    Sectoral planning on water, agriculture and urban development has not been able to prevent increased flood risks and environmental degradation in many deltas. Governments conceive strategic delta planning as a promising planning approach and develop strategic delta plans. Such plans are linked to

  19. Next Generation Nuclear Plant Materials Research and Development Program Plan

    International Nuclear Information System (INIS)

    G.O. Hayner; R.L. Bratton; R.N. Wright

    2005-01-01

    The U.S Department of Energy (DOE) has selected the Very High Temperature Reactor (VHTR) design for the Next Generation Nuclear Plant (NGNP) Project. The NGNP will demonstrate the use of nuclear power for electricity and hydrogen production without greenhouse gas emissions. The reactor design will be a graphite moderated, helium-cooled, prismatic or pebble-bed, thermal neutron spectrum reactor that will produce electricity and hydrogen in a state-of-the-art thermodynamically efficient manner. The NGNP will use very high burn-up, low-enriched uranium, TRISO-coated fuel and have a projected plant design service life of 60 years. The VHTR concept is considered to be the nearest-term reactor design that has the capability to efficiently produce hydrogen. The plant size, reactor thermal power, and core configuration will ensure passive decay heat removal without fuel damage or radioactive material releases during accidents. The NGNP Project is envisioned to demonstrate the following: (1) A full-scale prototype VHTR by about 2021; (2) High-temperature Brayton Cycle electric power production at full scale with a focus on economic performance; (3) Nuclear-assisted production of hydrogen (with about 10% of the heat) with a focus on economic performance; and (4) By test, the exceptional safety capabilities of the advanced gas-cooled reactors. Further, the NGNP program will: (1) Obtain a Nuclear Regulatory Commission (NRC) License to construct and operate the NGNP, this process will provide a basis for future performance based, risk-informed licensing; and (2) Support the development, testing, and prototyping of hydrogen infrastructures. The NGNP Materials Research and Development (R and D) Program is responsible for performing R and D on likely NGNP materials in support of the NGNP design, licensing, and construction activities. The NGNP Materials R and D Program includes the following elements: (1) Developing a specific approach, program plan and other project management

  20. Next Generation Nuclear Plant Materials Research and Development Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    G.O. Hayner; R.L. Bratton; R.N. Wright

    2005-09-01

    The U.S Department of Energy (DOE) has selected the Very High Temperature Reactor (VHTR) design for the Next Generation Nuclear Plant (NGNP) Project. The NGNP will demonstrate the use of nuclear power for electricity and hydrogen production without greenhouse gas emissions. The reactor design will be a graphite moderated, helium-cooled, prismatic or pebble-bed, thermal neutron spectrum reactor that will produce electricity and hydrogen in a state-of-the-art thermodynamically efficient manner. The NGNP will use very high burn-up, low-enriched uranium, TRISO-coated fuel and have a projected plant design service life of 60 years. The VHTR concept is considered to be the nearest-term reactor design that has the capability to efficiently produce hydrogen. The plant size, reactor thermal power, and core configuration will ensure passive decay heat removal without fuel damage or radioactive material releases during accidents. The NGNP Project is envisioned to demonstrate the following: (1) A full-scale prototype VHTR by about 2021; (2) High-temperature Brayton Cycle electric power production at full scale with a focus on economic performance; (3) Nuclear-assisted production of hydrogen (with about 10% of the heat) with a focus on economic performance; and (4) By test, the exceptional safety capabilities of the advanced gas-cooled reactors. Further, the NGNP program will: (1) Obtain a Nuclear Regulatory Commission (NRC) License to construct and operate the NGNP, this process will provide a basis for future performance based, risk-informed licensing; and (2) Support the development, testing, and prototyping of hydrogen infrastructures. The NGNP Materials Research and Development (R&D) Program is responsible for performing R&D on likely NGNP materials in support of the NGNP design, licensing, and construction activities. The NGNP Materials R&D Program includes the following elements: (1) Developing a specific approach, program plan and other project management tools for

  1. Proposed plan for critical experiments supporting thorium fuel cycle development

    International Nuclear Information System (INIS)

    Gore, B.F.

    1978-09-01

    A preliminary plan is proposed for critical experiments to provide data needed for the recycle of thorium based nuclear fuels. The sequence of experimentation starts with well moderated solutions followed by highly concentrated low moderated solutions. It then progresses through lattices moderated by water, by water plus soluble poisons, and by fissile solutions, to solutions poisoned by raschig rings and soluble poisons. Final experiments would treat lattices moderated by poisoned fissile solution, and arrays of stored fissile units

  2. Complex Development Report: Moanalua High School.

    Science.gov (United States)

    Anbe, Aruga and Ishizu, Architects, Inc., Honolulu, HI.

    This report documents the planning process and the decisions involved in master planning a proposed Honolulu high school, and it provides guidance for the implementation of those increments remaining after phase one of the first increment had been completed in September 1972. Phase two of the first increment and the second increment are now under…

  3. High level nuclear waste repository in salt: Sealing systems status and planning report: Draft report

    International Nuclear Information System (INIS)

    1985-09-01

    This report documents the initial conceptual design studies for a repository sealing system for a high-level nuclear waste repository in salt. The first step in the initial design studies was to review the current design level, termed schematic designs. This review identified practicality of construction and development of a design methodology as two key issues for the conceptual design. These two issues were then investigated during the initial design studies for seal system materials, seal placement, backfill emplacement, and a testing and monitoring plan. The results of these studies have been used to develop a program plan for completion of the sealing system conceptual design. 60 refs., 26 figs., 18 tabs

  4. A Collaborative Approach to Transportation Planning: Federal and State Perspectives on Section 180(c) Program Development

    International Nuclear Information System (INIS)

    Macaluso, C.; Strong, T.; Janairo, L.; Helvey, E.

    2006-01-01

    The Department of Energy's Office of Civilian Radioactive Waste Management (OCRWM) committed in its November 2003 Strategic Plan for the Safe Transportation of Spent Nuclear Fuel and High-Level Radioactive Waste to Yucca Mountain: A Guide to Stakeholder Interactions to develop the transportation system collaboratively with stakeholders. The Strategic Plan further stated that four state regional groups (SRGs) would be the 'anchors' for OCRWM's collaboration with the states. The first major transportation planning activity that OCRWM initiated after publication of the Strategic Plan was the development of the Section 180(c) grant program. This document describes that collaboration and its outcomes from the perspective of the OCRWM participants and one of the SRGs, the Council of State Governments - Midwestern Office (CSG Midwest). (authors)

  5. High performance nano-composite technology development

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Whung Whoe; Rhee, C. K.; Kim, S. J.; Park, S. D. [KAERI, Taejon (Korea, Republic of); Kim, E. K.; Jung, S. Y.; Ryu, H. J. [KRICT, Taejon (Korea, Republic of); Hwang, S. S.; Kim, J. K.; Hong, S. M. [KIST, Taejon (Korea, Republic of); Chea, Y. B. [KIGAM, Taejon (Korea, Republic of); Choi, C. H.; Kim, S. D. [ATS, Taejon (Korea, Republic of); Cho, B. G.; Lee, S. H. [HGREC, Taejon (Korea, Republic of)

    1999-06-15

    The trend of new material development are being to carried out not only high performance but also environmental attraction. Especially nano composite material which enhances the functional properties of components, extending the component life resulting to reduced the wastes and environmental contamination, has a great effect on various industrial area. The application of nano composite, depends on the polymer matrix and filler materials, has various application from semiconductor to medical field. In spite of nano composite merits, nano composite study are confined to a few special materials as a lab, scale because a few technical difficulties are still on hold. Therefore, the purpose of this study establishes the systematical planning to carried out the next generation projects on order to compete with other countries and overcome the protective policy of advanced countries with grasping over sea's development trends and our present status. (author).

  6. High performance nano-composite technology development

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Whung Whoe; Rhee, C. K.; Kim, S. J.; Park, S. D. [KAERI, Taejon (Korea, Republic of); Kim, E. K.; Jung, S. Y.; Ryu, H. J. [KRICT, Taejon (Korea, Republic of); Hwang, S. S.; Kim, J. K.; Hong, S. M. [KIST, Taejon (Korea, Republic of); Chea, Y. B. [KIGAM, Taejon (Korea, Republic of); Choi, C. H.; Kim, S. D. [ATS, Taejon (Korea, Republic of); Cho, B. G.; Lee, S. H. [HGREC, Taejon (Korea, Republic of)

    1999-06-15

    The trend of new material development are being to carried out not only high performance but also environmental attraction. Especially nano composite material which enhances the functional properties of components, extending the component life resulting to reduced the wastes and environmental contamination, has a great effect on various industrial area. The application of nano composite, depends on the polymer matrix and filler materials, has various application from semiconductor to medical field. In spite of nano composite merits, nano composite study are confined to a few special materials as a lab, scale because a few technical difficulties are still on hold. Therefore, the purpose of this study establishes the systematical planning to carried out the next generation projects on order to compete with other countries and overcome the protective policy of advanced countries with grasping over sea's development trends and our present status. (author).

  7. High performance nano-composite technology development

    International Nuclear Information System (INIS)

    Kim, Whung Whoe; Rhee, C. K.; Kim, S. J.; Park, S. D.; Kim, E. K.; Jung, S. Y.; Ryu, H. J.; Hwang, S. S.; Kim, J. K.; Hong, S. M.; Chea, Y. B.; Choi, C. H.; Kim, S. D.; Cho, B. G.; Lee, S. H.

    1999-06-01

    The trend of new material development are being to carried out not only high performance but also environmental attraction. Especially nano composite material which enhances the functional properties of components, extending the component life resulting to reduced the wastes and environmental contamination, has a great effect on various industrial area. The application of nano composite, depends on the polymer matrix and filler materials, has various application from semiconductor to medical field. In spite of nano composite merits, nano composite study are confined to a few special materials as a lab, scale because a few technical difficulties are still on hold. Therefore, the purpose of this study establishes the systematical planning to carried out the next generation projects on order to compete with other countries and overcome the protective policy of advanced countries with grasping over sea's development trends and our present status. (author).

  8. A Mixed Integer Programming for Port Anzali Development Plan

    OpenAIRE

    Mahdieh Allahviranloo

    2009-01-01

    This paper introduces a mixed integer programming model to find the optimum development plan for port Anzali. The model minimizes total system costs taking into account both port infrastructure costs and shipping costs. Due to the multipurpose function of the port, the model consists of 1020 decision variables and 2490 constraints. Results of the model determine the optimum number of berths that should be constructed in each period and for each type of cargo. In addition to, the results of se...

  9. Paraho oil shale module. Site development plan, Task 4

    Energy Technology Data Exchange (ETDEWEB)

    1981-10-01

    A management plan and schedule which covers all requirements for gaining access to the site and for conducting a Paraho Process demonstration program have been prepared. The oil shale available should represent a regional resource of suitable size and quality for commercial development. Discussed in this report are: proof of ownership; requirements for rights-of-way for access to the site; local zoning restrictions; water rights; site availability verification; and other legal requirements. (DMC)

  10. Air Freight Service Development Plan : Case: CMA CGM Logistics Vietnam

    OpenAIRE

    Nguyen, Giang

    2014-01-01

    Being one of the fastest-growing nations in the world, Vietnam is trading across the border actively and at the same time attracting multiple foreign investments. Import and export activities are occurring vigorously which leads to a huge potential for international transportation sectors, particularly for aviation industry. Hence, the ultimate goal of this thesis is to establish a development plan of air freight service for the case company – CMA CGM Logistics Vietnam (CCLOG VN). The stu...

  11. Developing a business plan for a startup e-business

    OpenAIRE

    Vu, Khanh

    2013-01-01

    The purpose of this thesis is to develop an initial business plan for a startup fashion company that operates on the Internet in the Vietnamese market. To reach the target objective, the thesis first examines e-business from a theoretical perspective and considers its advantages and disadvantages. Secondly, the macro environment of the proposed business is analyzed, namely the country of Vietnam and its e-commerce environment. Finally, the outcome of the thesis is presented in the form of a b...

  12. Developing Strategic Marketing Plan for International Tourism Industry

    OpenAIRE

    Zhang, Mingmo

    2013-01-01

    International travel agency is the case company where I did my practical training. This thesis focuses on analyzing the case company’s current situation, market environment and competition situation in the tourism market. The main objective is to analyze the complex situation of the case company to develop a strategic marketing plan for the case company to gain competitive advantage. In order to reach the objective, the thesis finds answers to the questions of what the current strategic marke...

  13. Environmental development plan for transportation programs: FY80 update

    Energy Technology Data Exchange (ETDEWEB)

    Saricks, C.L.; Singh, M.K.; Bernard, M.J. III; Bevilacqua, O.M.

    1980-09-01

    This is the second annual update of the environmental development plan (EDP) for transportation programs. It has been prepared as a cooperative effort of the Assistant Secretaries for Conservation and Solar Energy (ASCS) Office of Transportation Programs (CS/TP) and the Environment (ASEV) Office of Environmental Assessments. EDPs identify the ecosystem, resource, physical environment, health, safety, socioeconomic, and environmental control concerns associated with DOE programs. The programs include the research, development, demonstration, and assessment (RDD and A) of 14 transportation technologies and several strategy implementation projects. This EDP update presents a research and assessment plan for resolving any potentially adverse environmental concerns arising from these programs. The EDP process provides a framework for: incorporating environmental concerns into CS/TP planning and decision processes early to ensure they are assigned the same importance as technological, fiscal, and institutional concerns in decision making; resolving environmental concerns concurrently with energy technology and strategy development; and providing a research schedule that mitigates adverse environmental effects through sound technological design or policy analysis. This EDP also describes the status of each environmental concern and the plan for its resolution. Much of ongoing DOE reseirch and technology development is aimed at resolving concerns identified in this EDP. Each EDP is intended to be so comprehensive that no concerns escape notice. Care is taken to include any CS/TP action that may eventually require an Environmental Impact Statement. Because technology demonstration and commercialization tend to raise more environmental concerns than other portions of the transportation program, most of this EDP addresses these concerns.

  14. Optimization in underground mine planning - developments and opportunities

    OpenAIRE

    Musingwini, C.

    2016-01-01

    The application of mining-specific and generic optimization techniques in the mining industry is deeply rooted in the discipline of operations research (OR). OR has its origins in the British Royal Air Force and Army around the early 1930s. Its development continued during and after World War II. The application of OR techniques to optimization in the mining industry started to emerge in the early 1960s. Since then, optimization techniques have been applied to solve widely different mine plan...

  15. DEVELOPING INTERNET MARKETING PLAN. CASE COMPANY: ANTOREE INTERNATIONAL PTE. LTD.

    OpenAIRE

    Nguyen, Ngoc Minh

    2016-01-01

    The purpose of the thesis was to develop a current digital marketing plan of a service provider in Vietnam called Antoree International Pte. Ltd. There presented theories about the service marketing mix in the impact of the Internet; marketing strategy for service providers and all popular types of Internet marketing. In empirical part, information about the case company would follow next. A SWOT analysis would then provide readers a comprehensive look into the current situation of Antore...

  16. Development and Application of a Low Impact Development (LID-Based District Unit Planning Model

    Directory of Open Access Journals (Sweden)

    Cheol Hee Son

    2017-01-01

    Full Text Available The purpose of this study was to develop a low impact development-based district unit planning (LID-DP model and to verify the model by applying it to a test site. To develop the model, we identified various barriers to the urban planning process and examined the advantages of various LID-related techniques to determine where in the urban development process LID would provide the greatest benefit. The resulting model provides (1 a set of district unit planning processes that consider LID standards and (2 a set of evaluation methods that measure the benefits of the LID-DP model over standard urban development practices. The developed LID-DP process is composed of status analysis, comprehensive analysis, basic plan, and sectoral plans. To determine whether the LID-DP model met the proposed LID targets, we applied the model to a test site in Cheongju City, Chungcheongbuk-do Province, Republic of Korea. The test simulation showed that the LID-DP plan reduced nonpoint source pollutants (total nitrogen, 113%; total phosphorous, 193%; and biological oxygen demand, 199%; reduced rainfall runoff (infiltration volume, 102%; surface runoff, 101%; and improved the conservation rate of the natural environment area (132%. The successful application of this model also lent support for the greater importance of non-structural techniques over structural techniques in urban planning when taking ecological factors into account.

  17. Development of a statewide hospital plan for radiologic emergencies

    International Nuclear Information System (INIS)

    Dainiak, Nicholas; Delli Carpini, Domenico; Bohan, Michael; Werdmann, Michael; Wilds, Edward; Barlow, Agnus; Beck, Charles; Cheng, David; Daly, Nancy; Glazer, Peter; Mas, Peter; Nath, Ravinder; Piontek, Gregory; Price, Kenneth; Albanese, Joseph; Roberts, Kenneth; Salner, Andrew L.; Rockwell, Sara

    2006-01-01

    Although general guidelines have been developed for triage of victims in the field and for hospitals to plan for a radiologic event, specific information for clinicians and administrators is not available for guidance in efficient management of radiation victims during their early encounter in the hospital. A consensus document was developed by staff members of four Connecticut hospitals, two institutions of higher learning, and the State of Connecticut Department of Environmental Protection and Office of Emergency Preparedness, with assistance of the American Society for Therapeutic Radiology and Oncology. The objective was to write a practical manual for clinicians (including radiation oncologists, emergency room physicians, and nursing staff), hospital administrators, radiation safety officers, and other individuals knowledgeable in radiation monitoring that would be useful for evaluation and management of radiation injury. The rationale for and process by which the radiation response plan was developed and implemented in the State of Connecticut are reviewed. Hospital admission pathways are described, based on classification of victims as exposed, contaminated, and/or physically injured. This manual will be of value to those involved in planning the health care response to a radiologic event

  18. A national action plan for workforce development in behavioral health.

    Science.gov (United States)

    Hoge, Michael A; Morris, John A; Stuart, Gail W; Huey, Leighton Y; Bergeson, Sue; Flaherty, Michael T; Morgan, Oscar; Peterson, Janice; Daniels, Allen S; Paris, Manuel; Madenwald, Kappy

    2009-07-01

    Across all sectors of the behavioral health field there has been growing concern about a workforce crisis. Difficulties encompass the recruitment and retention of staff and the delivery of accessible and effective training in both initial, preservice training and continuing education settings. Concern about the crisis led to a multiphased, cross-sector collaboration known as the Annapolis Coalition on the Behavioral Health Workforce. With support from the Substance Abuse and Mental Health Services Administration, this public-private partnership crafted An Action Plan for Behavioral Health Workforce Development. Created with input from a dozen expert panels, the action plan outlines seven core strategic goals that are relevant to all sectors of the behavioral health field: expand the role of consumers and their families in the workforce, expand the role of communities in promoting behavioral health and wellness, use systematic recruitment and retention strategies, improve training and education, foster leadership development, enhance infrastructure to support workforce development, and implement a national research and evaluation agenda. Detailed implementation tables identify the action steps for diverse groups and organizations to take in order to achieve these goals. The action plan serves as a call to action and is being used to guide workforce initiatives across the nation.

  19. Electric Grid Expansion Planning with High Levels of Variable Generation

    Energy Technology Data Exchange (ETDEWEB)

    Hadley, Stanton W. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); You, Shutang [Univ. of Tennessee, Knoxville, TN (United States); Shankar, Mallikarjun [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Liu, Yilu [Univ. of Tennessee, Knoxville, TN (United States); Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2016-02-01

    Renewables are taking a large proportion of generation capacity in U.S. power grids. As their randomness has increasing influence on power system operation, it is necessary to consider their impact on system expansion planning. To this end, this project studies the generation and transmission expansion co-optimization problem of the US Eastern Interconnection (EI) power grid with a high wind power penetration rate. In this project, the generation and transmission expansion problem for the EI system is modeled as a mixed-integer programming (MIP) problem. This study analyzed a time series creation method to capture the diversity of load and wind power across balancing regions in the EI system. The obtained time series can be easily introduced into the MIP co-optimization problem and then solved robustly through available MIP solvers. Simulation results show that the proposed time series generation method and the expansion co-optimization model and can improve the expansion result significantly after considering the diversity of wind and load across EI regions. The improved expansion plan that combines generation and transmission will aid system planners and policy makers to maximize the social welfare. This study shows that modelling load and wind variations and diversities across balancing regions will produce significantly different expansion result compared with former studies. For example, if wind is modeled in more details (by increasing the number of wind output levels) so that more wind blocks are considered in expansion planning, transmission expansion will be larger and the expansion timing will be earlier. Regarding generation expansion, more wind scenarios will slightly reduce wind generation expansion in the EI system and increase the expansion of other generation such as gas. Also, adopting detailed wind scenarios will reveal that it may be uneconomic to expand transmission networks for transmitting a large amount of wind power through a long distance

  20. A Practice of Secure Development and Operational Environment Plan

    International Nuclear Information System (INIS)

    Park, Jaekwan; Seo, Sangmun; Suh, Yongsukl; Park, Cheol

    2017-01-01

    This paper suggests a practice of plan for SDOE establishment in a nuclear I and C. First, it is necessary to perform a requirements analysis to define key regulatory issues and determine the target systems. The analysis includes a survey to find out the applicable measures credited internationally. Based on the analysis results, this paper proposes an implementation plan including a process harmonizing security activities with legacy software activities and applicable technical, operational, and management measures for target systems. Recently, nuclear I and C has been faced with two security issues, cyber security (CS) and secure development and operational environment (SDOE). Unlike cyber security, few studies on planning SDOE have been presented. This paper suggests a plan for establishing an SDOE in a nuclear I and C. This paper defines three key considerations to comply with the regulatory position of RG. 1.152(R3) and proposes a process harmonizing the security activities with legacy software activities. In addition, this paper proposes technical, operational, and management measures applicable for SDOE.

  1. Development of high temperature turbine

    Energy Technology Data Exchange (ETDEWEB)

    Takahara, Kitao; Nouse, Hiroyuki; Yoshida, Toyoaki; Minoda, Mitsuhiro; Matsusue, Katsutoshi; Yanagi, Ryoji

    1988-07-01

    For the contribution to the development of FJR710, high by-pass ratio turbofan engine, with the study for many years of the development of high efficiency turbine for the jet engine, the first technical prize from the Energy Resource Research Committee was awarded in April, 1988. This report introduced its technical contents. In order to improve the thermal efficiency and enlarge the output, it is very effective to raise the gas temperature at the inlet of gas turbine. For its purpose, by cooling the nozzle and moving blades and having those blades operate at lower temperature than that of the working limitation, they realized, for the first time in Japan, the technique of cooling turbine to heighten the operational gas temperature. By that technique, it was enabled to raise the gas temperature at the inlet of turbine, to 1,350/sup 0/C from 850/sup 0/C. This report explain many important points of study covering the basic test, visualizing flow experiment, material discussion and structural design in the process of development. (9 figs)

  2. High-temperature gas-cooled reactor safety-reliability program plan

    Energy Technology Data Exchange (ETDEWEB)

    1981-03-01

    The purpose of this document is to present a safety plan as part of an overall program plan for the design and development of the High Temperature Gas-Cooled Reactor (HTGR). This plan is intended to establish a logical framework for identifying the technology necessary to demonstrate that the requisite degree of public risk safety can be achieved economically. This plan provides a coherent system safety approach together with goals and success criterion as part of a unifying strategy for licensing a lead reactor plant in the near term. It is intended to provide guidance to program participants involved in producing a technology base for the HTGR that is fully responsive to safety consideration in the design, evaluation, licensing, public acceptance, and economic optimization of reactor systems.

  3. Development of a Mobile App for Family Planning Providers.

    Science.gov (United States)

    Halsall, Viannella; Rogers, Jennifer; Witt, Jacki; Song, Sejun; Nguyen, Hoang Duc Huy; Kelly, Patricia

    To provide an overview of lessons learned during the development process of an app for iOS and Android based on national recommendations for providing quality family planning services. After a review of existing apps was conducted to determine whether an app of clinical recommendations for family planning existed, a team of clinicians, training specialists, and app developers created a resource app by first drafting a comprehensive content map. A prototype of the app was then pilot tested using smart tablets by a volunteer convenience sample of women's healthcare professionals. Outcomes measured included usability, acceptability, download analytics, and satisfaction by clinicians as reported through an investigator-developed tool. Sixty-nine professionals tested a prototype of the app, and completed a user satisfaction tool. Overall, user feedback was positive, and a zoom function was added to the final version as a result of the pilot test. Within 3 months of being publicly available, the app was downloaded 677 times, with 97% of downloads occurring on smart phones, 76% downloads occurring on iOS devices, and 24% on Android devices. This trend persisted throughout the following 3 months. Clinicians with an interest in developing an app should consider a team approach to development, pilot test the app prior to wider distribution, and develop a web-based version of the app to be used by clinicians who are unable to access smart devices in their practice setting.

  4. Sostenibilidad, plan de desarrollo y política petrolera Sustainability, Development Plan and oil policy

    Directory of Open Access Journals (Sweden)

    Álvarez H. Carlos G.

    1999-06-01

    Full Text Available Este ensayo examina la politica petrolera y de recursos naturales del Plan de Desarrollo. Muestra, en particular, que las declaraciones de 'sostenibilidad' son inconsistentes con las politicas que se adelantan y que se trata de una propuesta de incrementos desaforados de la produccion petrolera bajo la mirada de la economia estandar. El 'desarrollo sostenible' resulta siendo tarea de las generaciones futuras, desconociendo el mandato constitucional. Tambien discute la propuesta de reforma a la ley de regalias implicita en el articulo 60 del proyecto de ley de plan de desarrollo y muestra que se emplean indicadores de competitividad manipulados para subestimar la competitividad colombiana. De acuerdo con el analisis efectuado por el Ministerio de Minas no parece razonable aprobar esa reforma si se trata de mejorar la competitividad financiera. En suma, la actual politica petrolera no introduce elementos de democracia y sostenibilidad.This essay examines the oil and natural resource policies of the Development Plan. In particular, it shows that its declarations of 'sustainability' are inconsistent with the policies it puts forward and that it is really a proposal for boundless increases in oil production under the gaze of the standard economy. 'Sustainable development' turns out to be the task of future generations, ignoring the constitutional mandate.
    It also discusses the proposal for reform of the law on payments for oil and mineral exploitation implicit in Article 60 of the Plan's law proposal and shows that the competitiveness indicators it uses are manipulated to underestimate Colombian competi tiveness. In accordance with the analysis carried out by the Ministry of Mines, it does not appear reasonable to approve this reform if the purpose is to improve financial competitiveness. In sum, the current oil policy does not introduce elements of democracy or of sustainability.

  5. High performance in software development

    CERN Multimedia

    CERN. Geneva; Haapio, Petri; Liukkonen, Juha-Matti

    2015-01-01

    What are the ingredients of high-performing software? Software development, especially for large high-performance systems, is one the most complex tasks mankind has ever tried. Technological change leads to huge opportunities but challenges our old ways of working. Processing large data sets, possibly in real time or with other tight computational constraints, requires an efficient solution architecture. Efficiency requirements span from the distributed storage and large-scale organization of computation and data onto the lowest level of processor and data bus behavior. Integrating performance behavior over these levels is especially important when the computation is resource-bounded, as it is in numerics: physical simulation, machine learning, estimation of statistical models, etc. For example, memory locality and utilization of vector processing are essential for harnessing the computing power of modern processor architectures due to the deep memory hierarchies of modern general-purpose computers. As a r...

  6. Workforce planning and development in times of delivery system transformation.

    Science.gov (United States)

    Pittman, Patricia; Scully-Russ, Ellen

    2016-09-23

    As implementation of the US Affordable Care Act (ACA) advances, many domestic health systems are considering major changes in how the healthcare workforce is organized. The purpose of this study is to explore the dynamic processes and interactions by which workforce planning and development (WFPD) is evolving in this new environment. Informed by the theory of loosely coupled systems (LCS), we use a case study design to examine how workforce changes are being managed in Kaiser Permanente and Montefiore Health System. We conducted site visits with in-depth interviews with 8 to 10 stakeholders in each organization. Both systems demonstrate a concern for the impact of change on their workforce and have made commitments to avoid outsourcing and layoffs. Central workforce planning mechanisms have been replaced with strategies to integrate various stakeholders and units in alignment with strategic growth plans. Features of this new approach include early and continuous engagement of labor in innovation; the development of intermediary sense-making structures to garner resources, facilitate plans, and build consensus; and a whole system perspective, rather than a focus on single professions. We also identify seven principles underlying the WFPD processes in these two cases that can aid in development of a new and more adaptive workforce strategy in healthcare. Since passage of the ACA, healthcare systems are becoming larger and more complex. Insights from these case studies suggest that while organizational history and structure determined different areas of emphasis, our results indicate that large-scale system transformations in healthcare can be managed in ways that enhance the skills and capacities of the workforce. Our findings merit attention, not just by healthcare administrators and union leaders, but by policymakers and scholars interested in making WFPD policies at a state and national level more responsive.

  7. Developments in high energy physics

    International Nuclear Information System (INIS)

    Mukhi, Sunil; Roy, Probir

    2009-01-01

    This non-technical review article is aimed at readers with some physics background, including beginning research students. It provides a panoramic view of the main theoretical developments in high energy physics since its inception more than half a century ago, a period in which experiments have spanned an enormous range of energies, theories have been developed leading up to the standard model, and proposals - including the radical paradigm of string theory - have been made to go beyond the standard model. The list of references provided here is not intended to properly credit all original work but rather to supply the reader with a few pointers to the literature, specifically highlighting work done by Indian authors. (author)

  8. ZONAL IMPACT ANALYSIS OF A STRATEGIC PLANNING APPROACH FOR LAND DEVELOPMENT CONTROLS

    Directory of Open Access Journals (Sweden)

    Karin LIMAPORNWANITCH

    2004-01-01

    Full Text Available Due to rapid urban developments in developing cities, the integration of land-use and transportation planning is very necessary. However, up-to-date land-use and transportation interaction planning is still difficult, because of rapid urbanization and complex relationships. The lack of human resources, budget, and necessary data are some of the hindrances. The planners in Bangkok have tried to utilize Traffic Impact Assessment (TIA in harmonizing land developments and transportation improvements, but without a complete land-use comprehensive plan, the TIA cannot effectively manage urbanization. This paper intends to propose a Zonal Impact Analysis (ZIA framework as a strategic planning tool to balance travel demands of land developments and performance of transportation systems over urban areas. First, the land-use planning situation in Bangkok is explained, afterwards the framework is described. The framework is applied into Bangkapi areas as a case study. Both single and simultaneous development cases are considered. It was found that more comprehensive development alternatives were established. The most suitable zone for a single project is Zone 179, as the advantages of location in the center of radial networks, so full accessibility can be provided. Without any network improvements in Zone 179, the simultaneous developments should be implemented in Zone 168 and 173, as high capacities of the expressway are available. The results give a better understanding on the characteristics of land-use and transportation planning in Bangkapi. Finally, it was emphasized that the ZIA framework is a strategic planning alternative to increase the capabilities of growth management for sustainable developments.

  9. Methodology development to support NPR strategic planning. Final report

    International Nuclear Information System (INIS)

    1996-01-01

    This report covers the work performed in support of the Office of New Production Reactors during the 9 month period from January through September 1990. Because of the rapid pace of program activities during this time period, the emphasis on work performed shifted from the strategic planning emphasis toward supporting initiatives requiring a more immediate consideration and response. Consequently, the work performed has concentrated on researching and helping identify and resolve those issues considered to be of most immediate concern. Even though they are strongly interrelated, they can be separated into two broad categories as follows: The first category encompasses program internal concerns. Included are issues associated with the current demand for accelerating staff growth, satisfying the immediate need for appropriate skill and experience levels, team building efforts necessary to assure the development of an effective operating organization, ability of people and organizations to satisfactorily understand and execute their assigned roles and responsibilities, and the general facilitation of inter/intra organization communications and working relationships. The second category encompasses program execution concerns. These include those efforts required in development of realistic execution plans and implementation of appropriate control mechanisms which provide for effective forecasting, planning, managing, and controlling of on-going (or soon to be) program substantive activities according to the master integrated schedule and budget

  10. White Rose development plan amendment production volume increase

    International Nuclear Information System (INIS)

    2006-09-01

    In January 2001, Husky Oil Operations Limited (Husky), in joint-venture with Petro-Canada, submitted a Benefits Plan for the White Rose Development to the Canada- Newfoundland and Labrador Offshore Petroleum Board (C-NLOPB). This revised document provided the case for requesting an increase in the facility maximum daily production rate and the average annual production rate for the White Rose field from 100,000 barrels per day (bpd) as stated in the approved White Rose Development Plan to 140,000 bpd. In order to determine the potential for increasing oil production through the Floating Production, Storage and Offloading (FPSO) vessel, two things were considered, namely the proper reservoir management of the White Rose field to ensure optimum resource recovery, and the capacity of the FPSO topsides processing system and supporting utilities to accommodate increased production. This document presented a detailed review of all the implications of increased production on the South White Rose Reservoir. In addition, the results from FPSO performance testing were reviewed, including a study of options for de-bottlenecking the process plant on the topsides and capacity testing of selected process streams and support systems. Vibration analysis was conducted before and during performance testing in July 2006 and a small number of areas addressed. The document also addressed flow metering, resource management, certifying authority review, safety plan revisions, environmental effects, as well as benefits to Canada and Newfoundland. 21 tabs., 60 refs

  11. From Classroom to Career Development Planning: Eportfolio Use Examples

    Directory of Open Access Journals (Sweden)

    Ana Coric Samardzija

    2014-12-01

    Full Text Available In this paper we will present several examples of different maturity levels of ePortfolio usage at the Faculty of Organization and Informatics, University of Zagreb, Croatia. Firstly, we will illustrate basic in-class uses of ePortfolio in which students are introduced with the ePortfolio concept, self-reflection, self-monitoring and knowledge management. The primary goal of this phase is to show students how to record, plan and improve their professional skills in order to facilitate their preparation for the labour market. This phase is also aimed at recording and showcasing of students’ work and self-assessment. The second example of ePortfolio usage in this paper concerns self-guidance monitoring at the postgraduate level, where it is used to monitor the activities and progress of PhD students as well as to simplify communication between supervisors and doctoral candidates. In addition, by using the ePortfolio pattern, doctoral students are encouraged to start planning their careers as scientific researchers and experts. Finally, we introduce an example of using ePortfolios for academic human resources management as part of institutional quality assurance. For that purpose, a career development plan was developed to collect and monitor the work and progress of academic staff (both young researchers and teaching assistants.

  12. Strategic Planning for the Development of the Danube Area

    Directory of Open Access Journals (Sweden)

    ANTONIO VALENTIN TACHE

    2014-12-01

    Full Text Available The article includes concepts, information, methodologies of spatial planning focused on the Danube carried out within the European projects "Donauregionen" and "Donauregionen+", financed by the European Union through the South East Europe Transnational Cooperation Programme. The article proposes solutions for solving problems related to the opportunities offered by the Danube as an important corridor to support the economic growth and competitiveness of functional regions in the Danube area. The current situation in the Danube River riparian land-use planning policies involves (a creating the spatial concept of the Danube area interregional level, b developing integrated strategies to develop sectoral strategies embodied in the Danube area, the Transdanube strategy and development strategies for the Danube region as a whole. In this general scheme, indicators have been proposed, designed on four main areas (natural conditions, housing and human resources, technical infrastructure and transport, and economy. Based on the analyses conducted in the project, five Danube sub-regions and 19 Transdanube regions were established. Using the forecasting methodology proposed in the “Donauregionen+” project, three types of scenarios were developed for each sub-region: pessimistic, realistic and optimistic. All these scenarios have resulted in GIS cartograms, based on groups of territorial indicators that highlight the socio-economic development capacity of the Danube sub-regions.

  13. Development of high performance cladding

    International Nuclear Information System (INIS)

    Kiuchi, Kiyoshi

    2003-01-01

    The developments of superior next-generation light water reactor are requested on the basis of general view points, such as improvement of safety, economics, reduction of radiation waste and effective utilization of plutonium, until 2030 year in which conventional reactor plants should be renovate. Improvements of stainless steel cladding for conventional high burn-up reactor to more than 100 GWd/t, developments of manufacturing technology for reduced moderation-light water reactor (RMWR) of breeding ratio beyond 1.0 and researches of water-materials interaction on super critical pressure-water cooled reactor are carried out in Japan Atomic Energy Research Institute. Stable austenite stainless steel has been selected for fuel element cladding of advanced boiling water reactor (ABWR). The austenite stain less has the superiority for anti-irradiation properties, corrosion resistance and mechanical strength. A hard spectrum of neutron energy up above 0.1 MeV takes place in core of the reduced moderation-light water reactor, as liquid metal-fast breeding reactor (LMFBR). High performance cladding for the RMWR fuel elements is required to get anti-irradiation properties, corrosion resistance and mechanical strength also. Slow strain rate test (SSRT) of SUS 304 and SUS 316 are carried out for studying stress corrosion cracking (SCC). Irradiation tests in LMFBR are intended to obtain irradiation data for damaged quantity of the cladding materials. (M. Suetake)

  14. Advanced Reactor Technology -- Regulatory Technology Development Plan (RTDP)

    Energy Technology Data Exchange (ETDEWEB)

    Moe, Wayne Leland [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2015-05-01

    This DOE-NE Advanced Small Modular Reactor (AdvSMR) regulatory technology development plan (RTDP) will link critical DOE nuclear reactor technology development programs to important regulatory and policy-related issues likely to impact a “critical path” for establishing a viable commercial AdvSMR presence in the domestic energy market. Accordingly, the regulatory considerations that are set forth in the AdvSMR RTDP will not be limited to any one particular type or subset of advanced reactor technology(s) but rather broadly consider potential regulatory approaches and the licensing implications that accompany all DOE-sponsored research and technology development activity that deal with commercial non-light water reactors. However, it is also important to remember that certain “minimum” levels of design and safety approach knowledge concerning these technology(s) must be defined and available to an extent that supports appropriate pre-licensing regulatory analysis within the RTDP. Final resolution to advanced reactor licensing issues is most often predicated on the detailed design information and specific safety approach as documented in a facility license application and submitted for licensing review. Because the AdvSMR RTDP is focused on identifying and assessing the potential regulatory implications of DOE-sponsored reactor technology research very early in the pre-license application development phase, the information necessary to support a comprehensive regulatory analysis of a new reactor technology, and the resolution of resulting issues, will generally not be available. As such, the regulatory considerations documented in the RTDP should be considered an initial “first step” in the licensing process which will continue until a license is issued to build and operate the said nuclear facility. Because a facility license application relies heavily on the data and information generated by technology development studies, the anticipated regulatory

  15. Advanced Reactor Technology -- Regulatory Technology Development Plan (RTDP)

    International Nuclear Information System (INIS)

    Moe, Wayne Leland

    2015-01-01

    This DOE-NE Advanced Small Modular Reactor (AdvSMR) regulatory technology development plan (RTDP) will link critical DOE nuclear reactor technology development programs to important regulatory and policy-related issues likely to impact a ''critical path'' for establishing a viable commercial AdvSMR presence in the domestic energy market. Accordingly, the regulatory considerations that are set forth in the AdvSMR RTDP will not be limited to any one particular type or subset of advanced reactor technology(s) but rather broadly consider potential regulatory approaches and the licensing implications that accompany all DOE-sponsored research and technology development activity that deal with commercial non-light water reactors. However, it is also important to remember that certain ''minimum'' levels of design and safety approach knowledge concerning these technology(s) must be defined and available to an extent that supports appropriate pre-licensing regulatory analysis within the RTDP. Final resolution to advanced reactor licensing issues is most often predicated on the detailed design information and specific safety approach as documented in a facility license application and submitted for licensing review. Because the AdvSMR RTDP is focused on identifying and assessing the potential regulatory implications of DOE-sponsored reactor technology research very early in the pre-license application development phase, the information necessary to support a comprehensive regulatory analysis of a new reactor technology, and the resolution of resulting issues, will generally not be available. As such, the regulatory considerations documented in the RTDP should be considered an initial ''first step'' in the licensing process which will continue until a license is issued to build and operate the said nuclear facility. Because a facility license application relies heavily on the data and information generated by

  16. Advanced Reactor Technologies - Regulatory Technology Development Plan (RTDP)

    Energy Technology Data Exchange (ETDEWEB)

    Moe, Wayne L. [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2017-08-23

    This DOE-NE Advanced Small Modular Reactor (AdvSMR) regulatory technology development plan (RTDP) will link critical DOE nuclear reactor technology development programs to important regulatory and policy-related issues likely to impact a “critical path” for establishing a viable commercial AdvSMR presence in the domestic energy market. Accordingly, the regulatory considerations that are set forth in the AdvSMR RTDP will not be limited to any one particular type or subset of advanced reactor technology(s) but rather broadly consider potential regulatory approaches and the licensing implications that accompany all DOE-sponsored research and technology development activity that deal with commercial non-light water reactors. However, it is also important to remember that certain “minimum” levels of design and safety approach knowledge concerning these technology(s) must be defined and available to an extent that supports appropriate pre-licensing regulatory analysis within the RTDP. Final resolution to advanced reactor licensing issues is most often predicated on the detailed design information and specific safety approach as documented in a facility license application and submitted for licensing review. Because the AdvSMR RTDP is focused on identifying and assessing the potential regulatory implications of DOE-sponsored reactor technology research very early in the pre-license application development phase, the information necessary to support a comprehensive regulatory analysis of a new reactor technology, and the resolution of resulting issues, will generally not be available. As such, the regulatory considerations documented in the RTDP should be considered an initial “first step” in the licensing process which will continue until a license is issued to build and operate the said nuclear facility. Because a facility license application relies heavily on the data and information generated by technology development studies, the anticipated regulatory

  17. Developing health and social care planning in collaboration.

    Science.gov (United States)

    Rämgård, Margareta; Blomqvist, Kerstin; Petersson, Pia

    2015-01-01

    Collaboration between different professions in community care for older people is often both difficult and complex. In this project, a participatory action research (PAR) was conducted in order to support the professions involved in the care for older people to develop individualized health and social care plans. Cases from daily work were discussed in different professional groups over a period of one year. A key finding was that lack of knowledge regarding the other professions' field of expertise and their underlying professional culture and values was a barrier in their collaboration. However, as the continuous reflective dialogue process progressed, the participants began to reflect more about the importance of collaboration as a prerequisite to achieve the best possible care for the recipient. This process of reflection led to the often complex needs of the care recipients being given a more central position and thus care plans being better tailored to each person's needs.

  18. Office of Crystalline Repository Development FY 83 technical project plan

    International Nuclear Information System (INIS)

    1983-03-01

    The technical plan for FY 83 activities of the Office of Crystalline Repository Development is presented in detail. Crystalline Rock Project objectives are discussed in relation to the National Waste Terminal storage (NWTS) program. The plan is in full compliance with requirements mandated by the Nuclear Waste Policy Act of 1982. Implementation will comply with the requirements and criteria set forth in the Nuclear Regulatory Commission regulations (10 CFR 60) and the Environmental Protection Agency standard (40 CFR 191). Technical approaches and the related milestones and schedules are presented for each of the Level 3 NWTS work Breakdown Structure Tasks. These are: Systems, Waste Package, Site, Repository, Regulatory and Institutional, Test Facilities and Excavations, Land Acquisition, and Program Management

  19. MANAGING SUSTAINABLE DEVELOPMENT OF MEAT PROCESSING PLANTS AS PART OF THE MECHANISM OF STRATEGIC PLANNING

    Directory of Open Access Journals (Sweden)

    I. S. Gusev

    2015-01-01

    Full Text Available Studies have proven that, at present one of the priority research areas as part of the Development Strategy of the Food Processing Industry of the Russian Federation until 2020 is to develop effective mechanisms for sustainable socio-economic development of industrial enterprises. This article investigated the logic of strategic planning within the framework of sustainable economic growth, analyzed the structure of strategic planning, study the subject of strategic planning in the management of sustainable development of enterprises, justified the basic principles of strategic planning for the effective management of sustainable development of industrial enterprises, as well as the complex of organizational tactical activities of operational management strategy for sustainable development of the enterprise. The observation revealed that currently there was a high need for the framework of the branch, departmental and state programs implemented in industrial management of scientific and methodological approaches of strategic planning. Studies have shown that these approaches in its conceptual entity should be based on the growth potential of the sustainable development of meat processing plants in space and time in order to achieve high competitive advantages. Conducted a systematic analysis of industry conditions proved that the problem of sustainable operation and development of meat processing enterprises as a problem of management and control is relatively new, unexplored and highly relevant. On the contrary, it is the basis of modern management strategy and management is a concept and methodology of the so-called adaptive enterprise development under the action of various external and internal factors, risks that may threaten its economic stability and sustainability.

  20. Initial Scale Development of the Contextual Support for Post-Secondary Planning Scales

    Science.gov (United States)

    Ali, Saba Rasheed; Martens, Jessica Kelly; Button, Christopher; Larma, Nicholas C.

    2011-01-01

    Vocational psychologists and career theorists have articulated the importance of social support in the development of career plans for high school youth. More recently, Lent, Brown, and Hackett carefully articulated the location of contextual supports in the Social Cognitive Career Theory (SCCT) framework. However, there is a paucity of research…

  1. High resolution tomographic instrument development

    International Nuclear Information System (INIS)

    1992-01-01

    Our recent work has concentrated on the development of high-resolution PET instrumentation reflecting in part the growing importance of PET in nuclear medicine imaging. We have developed a number of positron imaging instruments and have the distinction that every instrument has been placed in operation and has had an extensive history of application for basic research and clinical study. The present program is a logical continuation of these earlier successes. PCR-I, a single ring positron tomograph was the first demonstration of analog coding using BGO. It employed 4 mm detectors and is currently being used for a wide range of biological studies. These are of immense importance in guiding the direction for future instruments. In particular, PCR-II, a volume sensitive positron tomograph with 3 mm spatial resolution has benefited greatly from the studies using PCR-I. PCR-II is currently in the final stages of assembly and testing and will shortly be placed in operation for imaging phantoms, animals and ultimately humans. Perhaps the most important finding resulting from our previous study is that resolution and sensitivity must be carefully balanced to achieve a practical high resolution system. PCR-II has been designed to have the detection characteristics required to achieve 3 mm resolution in human brain under practical imaging situations. The development of algorithms by the group headed by Dr. Chesler is based on a long history of prior study including his joint work with Drs. Pelc and Reiderer and Stearns. This body of expertise will be applied to the processing of data from PCR-II when it becomes operational

  2. High resolution tomographic instrument development

    Energy Technology Data Exchange (ETDEWEB)

    1992-08-01

    Our recent work has concentrated on the development of high-resolution PET instrumentation reflecting in part the growing importance of PET in nuclear medicine imaging. We have developed a number of positron imaging instruments and have the distinction that every instrument has been placed in operation and has had an extensive history of application for basic research and clinical study. The present program is a logical continuation of these earlier successes. PCR-I, a single ring positron tomograph was the first demonstration of analog coding using BGO. It employed 4 mm detectors and is currently being used for a wide range of biological studies. These are of immense importance in guiding the direction for future instruments. In particular, PCR-II, a volume sensitive positron tomograph with 3 mm spatial resolution has benefited greatly from the studies using PCR-I. PCR-II is currently in the final stages of assembly and testing and will shortly be placed in operation for imaging phantoms, animals and ultimately humans. Perhaps the most important finding resulting from our previous study is that resolution and sensitivity must be carefully balanced to achieve a practical high resolution system. PCR-II has been designed to have the detection characteristics required to achieve 3 mm resolution in human brain under practical imaging situations. The development of algorithms by the group headed by Dr. Chesler is based on a long history of prior study including his joint work with Drs. Pelc and Reiderer and Stearns. This body of expertise will be applied to the processing of data from PCR-II when it becomes operational.

  3. High resolution tomographic instrument development

    Energy Technology Data Exchange (ETDEWEB)

    1992-01-01

    Our recent work has concentrated on the development of high-resolution PET instrumentation reflecting in part the growing importance of PET in nuclear medicine imaging. We have developed a number of positron imaging instruments and have the distinction that every instrument has been placed in operation and has had an extensive history of application for basic research and clinical study. The present program is a logical continuation of these earlier successes. PCR-I, a single ring positron tomograph was the first demonstration of analog coding using BGO. It employed 4 mm detectors and is currently being used for a wide range of biological studies. These are of immense importance in guiding the direction for future instruments. In particular, PCR-II, a volume sensitive positron tomograph with 3 mm spatial resolution has benefited greatly from the studies using PCR-I. PCR-II is currently in the final stages of assembly and testing and will shortly be placed in operation for imaging phantoms, animals and ultimately humans. Perhaps the most important finding resulting from our previous study is that resolution and sensitivity must be carefully balanced to achieve a practical high resolution system. PCR-II has been designed to have the detection characteristics required to achieve 3 mm resolution in human brain under practical imaging situations. The development of algorithms by the group headed by Dr. Chesler is based on a long history of prior study including his joint work with Drs. Pelc and Reiderer and Stearns. This body of expertise will be applied to the processing of data from PCR-II when it becomes operational.

  4. Strengthening of competence planning truss through instructional media development details

    Science.gov (United States)

    Handayani, Sri; Nurcahyono, M. Hadi

    2017-03-01

    Competency-Based Learning is a model of learning in which the planning, implementation, and assessment refers to the mastery of competencies. Learning in lectures conducted in the framework for comprehensively realizing student competency. Competence means the orientation of the learning activities in the classroom must be given to the students to be more active learning, active search for information themselves and explore alone or with friends in learning activities in pairs or in groups, learn to use a variety of learning resources and printed materials, electronic media, as well as environment. Analysis of learning wooden structure known weakness in the understanding of the truss detail. Hence the need for the development of media that can provide a clear picture of what the structure of the wooden horses and connection details. Development of instructional media consisted of three phases of activity, namely planning, production and assessment. Learning Media planning should be tailored to the needs and conditions necessary to provide reinforcement to the mastery of competencies, through the table material needs. The production process of learning media is done by using hardware (hardware) and software (software) to support the creation of a medium of learning. Assessment of the media poduk yan include feasibility studies, namely by subject matter experts, media experts, while testing was done according to the student's perception of the product. The results of the analysis of the materials for the instructional aspects of the results obtained 100% (very good) and media analysis for the design aspects of the media expressed very good with a percentage of 88.93%. While the analysis of student perceptions expressed very good with a percentage of 84.84%. Media Learning Truss Details feasible and can be used in the implementation of learning wooden structure to provide capacity-building in planning truss

  5. Deep-Burn Modular Helium Reactor Fuel Development Plan

    Energy Technology Data Exchange (ETDEWEB)

    McEachern, D

    2002-12-02

    This document contains the workscope, schedule and cost for the technology development tasks needed to satisfy the fuel and fission product transport Design Data Needs (DDNs) for the Gas Turbine-Modular Helium Reactor (GT-MHR), operating in its role of transmuting transuranic (TRU) nuclides in spent fuel discharged from commercial light-water reactors (LWRs). In its application for transmutation, the GT-MHR is referred to as the Deep-Burn MHR (DB-MHR). This Fuel Development Plan (FDP) describes part of the overall program being undertaken by the U.S. Department of Energy (DOE), utilities, and industry to evaluate the use of the GT-MHR to transmute transuranic nuclides from spent nuclear fuel. The Fuel Development Plan (FDP) includes the work on fuel necessary to support the design and licensing of the DB-MHR. The FDP is organized into ten sections. Section 1 provides a summary of the most important features of the plan, including cost and schedule information. Section 2 describes the DB-MHR concept, the features of its fuel and the plan to develop coated particle fuel for transmutation. Section 3 describes the knowledge base for fabrication of coated particles, the experience with irradiation performance of coated particle fuels, the database for fission product transport in HTGR cores, and describes test data and calculations for the performance of coated particle fuel while in a repository. Section 4 presents the fuel performance requirements in terms of as-manufactured quality and performance of the fuel coatings under irradiation and accident conditions. These requirements are provisional because the design of the DB-MHR is in an early stage. However, the requirements are presented in this preliminary form to guide the initial work on the fuel development. Section 4 also presents limits on the irradiation conditions to which the coated particle fuel can be subjected for the core design. These limits are based on past irradiation experience. Section 5 describes

  6. Growth and development studies Hiroshima and Nagasaki: research plan

    Energy Technology Data Exchange (ETDEWEB)

    Finch, S C; Jablon, S; Hrubec, Zdenek

    1962-03-21

    This report summarizes the research plan for prospective evaluation of growth and development in those exposed to varying amounts of ionizing radiation during childhood or while in utero in Hiroshima or Nagasaki. Some experimental observations are briefly presented to provide background information, and the results of previous studies of growth and development at the Atomic Bomb Casualty Commission (ABCC) are reviewed. Procedures have been described for determining the top of the growth curve for the in utero exposed and the maximum growth and development of those exposed during childhood in comparison to their nonexposed counterparts. Differences in growth and development found between exposed and nonexposed individuals will be analysed in relation to radiation dose, age at time of exposure, sex, and socioeconomic factors. Attempts will be made to determine whether or not abnormalities in visual acuity are increased in those exposed while in utero or during childhood as compared to nonexposed or comparable ages. 23 references, 2 tables.

  7. 2016 Fermilab Laboratory Directed Research & Development Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    Wester, W. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)

    2016-05-25

    Fermilab is executing Laboratory Directed Research and Development (LDRD) as outlined by order DOE O 413.2B in order to enhance and realize the mission of the laboratory in a manner that also supports the laboratory’s strategic objectives and the mission of the Department of Energy. LDRD funds enable scientific creativity, allow for exploration of “high risk, high payoff” research, and allow for the demonstration of new ideas, technical concepts, and devices. LDRD also has an objective of maintaining and enhancing the scientific and technical vitality of Fermilab. LDRD is able to fund employee-initiated proposals that address the current strategic objectives and better position Fermilab for future mission needs. The request for such funds is made in consideration of the investment needs, affordability, and directives from DOE and Congress. Review procedures of the proposals will insure that those proposals which most address the strategic goals of the DOE and the Laboratory or which best position Fermilab for the future will be recommended to the Laboratory Director who has responsibility for approval. The execution of each approved project will be the responsibility of the Principal Investigator, PI, who will follow existing Laboratory guidelines to ensure compliance with safety, environmental, and quality assurance practices. A Laboratory Director-appointed LDRD Coordinator will work with Committees, Laboratory Management, other Fermilab Staff, and the PI’s to oversee the implementation of policies and procedures of LDRD and provide the management and execution of this Annual Program Plan. FY16 represents third fiscal year in which LDRD has existed at Fermilab. The number of preliminary proposals (117) submitted in response to the LDRD Call for Proposals indicates very strong interest of the program within the Fermilab community. The first two Calls have resulted in thirteen active LDRD projects – and it is expected that between five and seven new

  8. Energy and nuclear power planning in developing countries

    International Nuclear Information System (INIS)

    1985-01-01

    In this publication of the IAEA, after the introduction, four substantive parts follow. Part I, Energy demand and rational energy supply, deals with the needs for energy, primary energy resources and reserves, energy transport, storage, distribution and conservation, including the environmental effects on energy development. Part II, Economic aspects of energy development, presents an integrated view of the basic concepts of energy economics, evaluation of alternative energy projects with an in-depth comparison of electricity generation costs of nuclear and fossil-fuelled power plants. Part III, World energy development status and trends, begins with an overview of the world energy status and trends and continues with a presentation of the energy situation in industrialized countries and in developing countries. Part IV, Energy planning, deals with the optimization techniques, energy planning concepts and computerized models. The launching conditions and implementation of a nuclear power programme are described in detail. 582 references are given in the text and a bibliographical list of 356 titles has been added

  9. Kenya's Climate Change Action Plan. Low Carbon Climate Resilient Development Pathway

    Energy Technology Data Exchange (ETDEWEB)

    Murphy, D.; Sawyer, D.; Stiebert, S.; McFatridge, S. [International Institute for Sustainable Development IISD, Winnipeg, Manitoba (Canada); Wuertenberger, L.; Van Tilburg, X.; Hekkenberg, M. [Energy research Centre of the Netherlands ECN, Policy Studies, Amsterdam (Netherlands); Owino, T.; Battye, W. [ClimateCare, Nairobi (Kenya); Mutia, T. [Regional Institute for Social Enterprise Kenya RISE, Nairobi (Kenya); Olum, P. [Climate Change Consultant (Kenya)

    2012-12-15

    Kenya Vision 2030 - the long-term development blueprint for the country - aims to transform Kenya into 'a newly industrialising, middle-income country providing a high quality of life to all its citizens in a clean and secure environment'. A low carbon climate resilient development pathway, as set out in this Climate Change Action Plan, can help meet Vision 2030 goals through actions that address both sustainable development and climate change. This pathway can also help the Government achieve the Millennium Development Goals and other internationally agreed development goals without compromising the environment and its natural resources. As Kenya realizes its development aspirations, there will be gains and risks. A growing population and economy with migration to cities will mean increases in greenhouse gas (GHG) emissions. Resulting environmental and social conditions, including increased competition over resources, could intensify vulnerability to climate risks. Transitioning to a low carbon climate resilient development pathway can address future risks thereby improving Kenya's ability to prosper under a changing climate while reducing the emissions intensity of a growing economy. Moving forward on the 2010 National Climate Change Response Strategy will help Kenya transition to a low carbon climate resilient development pathway that puts people and livelihoods at the forefront. The strategy recognized the importance of climate change and development, and this Climate Change Action Plan is the logical next step. A yearlong multistakeholder participatory process involving the public sector, private sector and civil society resulted in this Action Plan that identifies priority climate change actions for Kenya for the short, medium and long term. The Government of Kenya takes climate change and its impact on development seriously. Climate change is considered a crosscutting issue that will be mainstreamed in the planning process both at the national

  10. Teachers’ professional development: An analysis of the use of Professional Development Plans in a Dutch school

    NARCIS (Netherlands)

    Janssen, Sandra; Kreijns, Karel; Theo, Bastiaens; Stijnen, Sjef; Vermeulen, Marjan

    2018-01-01

    Professional development of teachers has become an essential condition in today’s knowledge-based society to sustain the quality of teaching. Therefore, the Dutch government promotes this now professional development. As a result, Professional Development Plans (PDPs) are now increasingly used to

  11. National Energy Audit Tool for Multifamily Buildings Development Plan

    Energy Technology Data Exchange (ETDEWEB)

    Malhotra, Mini [ORNL; MacDonald, Michael [Sentech, Inc.; Accawi, Gina K [ORNL; New, Joshua Ryan [ORNL; Im, Piljae [ORNL

    2012-03-01

    The U.S. Department of Energy's (DOE's) Weatherization Assistance Program (WAP) enables low-income families to reduce their energy costs by providing funds to make their homes more energy efficient. In addition, the program funds Weatherization Training and Technical Assistance (T and TA) activities to support a range of program operations. These activities include measuring and documenting performance, monitoring programs, promoting advanced techniques and collaborations to further improve program effectiveness, and training, including developing tools and information resources. The T and TA plan outlines the tasks, activities, and milestones to support the weatherization network with the program implementation ramp up efforts. Weatherization of multifamily buildings has been recognized as an effective way to ramp up weatherization efforts. To support this effort, the 2009 National Weatherization T and TA plan includes the task of expanding the functionality of the Weatherization Assistant, a DOE-sponsored family of energy audit computer programs, to perform audits for large and small multifamily buildings This report describes the planning effort for a new multifamily energy audit tool for DOE's WAP. The functionality of the Weatherization Assistant is being expanded to also perform energy audits of small multifamily and large multifamily buildings. The process covers an assessment of needs that includes input from national experts during two national Web conferences. The assessment of needs is then translated into capability and performance descriptions for the proposed new multifamily energy audit, with some description of what might or should be provided in the new tool. The assessment of needs is combined with our best judgment to lay out a strategy for development of the multifamily tool that proceeds in stages, with features of an initial tool (version 1) and a more capable version 2 handled with currently available resources. Additional

  12. Post Irradiation Examination Plan for High-Burnup Demonstration Project Sister Rods

    Energy Technology Data Exchange (ETDEWEB)

    Scaglione, John M [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Montgomery, Rose [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Bevard, Bruce Balkcom [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2016-04-01

    This test plan describes the experimental work to be implemented by the U.S. Department of Energy (DOE) Office of Nuclear Energy (NE) to characterize high burnup (HBU) spent nuclear fuel (SNF) in conjunction with the High Burnup Dry Storage Cask Research and Development Project and serves to coordinate and integrate the multi-year experimental program to collect and develop data regarding the continued storage and eventual transport of HBU (i.e., >45 GWd/MTU) SNF. The work scope involves the development, performance, technical integration, and oversight of measurements and collection of relevant data, guided by analyses and demonstration of need.

  13. Optimal planning in a developing industrial microgrid with sensitive loads

    Directory of Open Access Journals (Sweden)

    M. Naderi

    2017-11-01

    Full Text Available Computer numerical control (CNC machines are known as sensitive loads in industrial estates. These machines require reliable and qualified electricity in their often long work periods. Supplying these loads with distributed energy resources (DERs in a microgrid (MG can be done as an appropriate solution. The aim of this paper is to analyze the implementation potential of a real and developing MG in Shad-Abad industrial estate, Tehran, Iran. Three MG planning objectives are considered including assurance of sustainable and secure operation of CNC machines as sensitive loads, minimizing the costs of MG construction and operation, and using available capacities to penetrate the highest possible renewable energy sources (RESs which subsequently results in decreasing the air pollutants specially carbon dioxide (CO2. The HOMER (hybrid optimization model for electric renewable software is used to specify the technical feasibility of MG planning and to select the best plan economically and environmentally. Different scenarios are considered in this regard to determine suitable capacity of production participants, and to assess the MG indices such as the reliability.

  14. Ongoing development of digital radiotherapy plan review tools

    International Nuclear Information System (INIS)

    Ebert, M.A.; Hatton, J.; Cornes, D.

    2011-01-01

    Full text: To describe ongoing development of software to support the review of radiotherapy treatment planning system (TPS) data. The 'SWAN' software program was conceived in 2000 and initially developed for the RADAR (TROG 03.04) prostate radiotherapy trial. Validation of the SWAN program has been occurring via implementation by TROG in support of multiple clinical trials. Development has continued and the SWAN software program is now supported by modular components which comprise the 'SW AN system'. This provides a comprehensive set of tools for the review, analysis and archive of TPS exports. The SWAN system has now been used in support of over 20 radiotherapy trials and to review the plans of over 2,000 trial participants. The use of the system for the RADAR trial is now culminating in the derivation of dose-outcomes indices for prostate treatment toxicity. Newly developed SWAN tools include enhanced remote data archive/retrieval, display of dose in both relative and absolute modes, and interfacing to a Matlab-based add-on ('VAST') that allows quantitative analysis of delineated volumes including regional overlap statistics for multi-observer studies. Efforts are continuing to develop the SWAN system in the context of international collaboration aimed at harmonising the quality-assurance activities of collaborative trials groups. Tools such as the SWAN system are essential for ensuring the collection of accurate and reliable evidence to guide future radiotherapy treatments. One of the principal challenges of developing such a tool is establishing a development path that will ensure its validity and applicability well into the future.

  15. PM2006: a highly scalable urban planning management information system--Case study: Suzhou Urban Planning Bureau

    Science.gov (United States)

    Jing, Changfeng; Liang, Song; Ruan, Yong; Huang, Jie

    2008-10-01

    During the urbanization process, when facing complex requirements of city development, ever-growing urban data, rapid development of planning business and increasing planning complexity, a scalable, extensible urban planning management information system is needed urgently. PM2006 is such a system that can deal with these problems. In response to the status and problems in urban planning, the scalability and extensibility of PM2006 are introduced which can be seen as business-oriented workflow extensibility, scalability of DLL-based architecture, flexibility on platforms of GIS and database, scalability of data updating and maintenance and so on. It is verified that PM2006 system has good extensibility and scalability which can meet the requirements of all levels of administrative divisions and can adapt to ever-growing changes in urban planning business. At the end of this paper, the application of PM2006 in Urban Planning Bureau of Suzhou city is described.

  16. Inverse planning in brachytherapy from radium to high rate 192 iridium afterloading

    International Nuclear Information System (INIS)

    Lahanas, M.; Mould, R.F.; Baltas, D.; Karauzakis, K.; Giannouli, S.; Baltas, D.

    2004-01-01

    We consider the inverse planning problem in brachytherapy, i.e. the problem to determine an optimal number of catheters, number of sources for low-dose rate brachytherapy (LDR) and the optimal dwell times for high-dose rate brachytherapy (HDR) necessary to obtain an optimal as possible dose distribution. Starting from the 1930s, inverse planning for LDR brachytherapy used geometrically derived rules to determine the optimal placement of sources in order to achieve a uniform dose distribution of a specific level in planes, spheres and cylinders. Rules and nomograms were derived which still are widely used. With the rapid development of 3D imaging technologies and the rapidly increasing computer power we have now entered the new era of computer-based inverse planning in brachytherapy. The inverse planning is now an optimisation process adapted to the individual geometry of the patient. New inverse planning optimisation algorithms are anatomy-based that consider the real anatomy of the tumour and the organs at risk (OAR). Computer-based inverse planning considers various effects such as stability of solutions for seed misplacements which cannot ever be solved analytically without gross simplifications. In the last few years multiobjective (MO) inverse planning algorithms have been developed which recognise the MO optimisation problem which is inherent in inverse planning in brachytherapy. Previous methods used a trial and error method to obtain a satisfactory solution. MO optimisation replaces this trial and error process by presenting a representative set of dose distributions that can be obtained. With MO optimisation it is possible to obtain information that can be used to obtain the optimum number of catheters, their position and the optimum distribution of dwell times for HDR brachytherapy. For LDR brachytherapy also the stability of solutions due to seed migration can also be improved. A spectrum of alternative solutions is available and the treatment planner

  17. Planning and development of the Spanish nuclear power programme

    International Nuclear Information System (INIS)

    Lopez-Rodriguez, M.

    1983-01-01

    The paper analyses the Spanish nuclear power programme from its inception to the present time, doing so within the context of the country, characterized by the fairly rapid change from a basically agricultural economy to an economy in which industry and services play an important part and the transformation of which took place mainly during the decade prior to the energy crisis 1973. Reference is made to the early establishment of the Junta de Energia Nuclear (Nuclear Energy Board) (JEN), which was set up as a research body even before nuclear energy became competitive with other sources for the production of electric power and which, by adapting its structure and programmes to the different phases in the development and utilization of nuclear energy in the country, contributed the necessary scientific, technical and legal infrastructure. There is also an analysis of the most striking features of the Spanish energy system and an account of the planning and construction of the first three Spanish nuclear power stations. A further subject of discussion is the energy planning and development projects devised by the Government which gave rise to the second generation of nuclear power plants, some of which are already in operation and the remainder in an advanced state of construction. Emphasis is placed on the action taken by the Spanish Government to increase the participation of Spanish industry in the construction of nuclear power plants and in the supply of equipment and services required for their operation. Reference is made to the experimental changes which have been made in the institutional infrastructure in order to adapt it to the phase of development which has been reached and to the objectives subsequently laid down in the planning: establishment of ENUSA (the national uranium enterprise), the Equipos Nucleares corporation and the Nuclear Safety Council, and also the changes made in the JEN

  18. Tube Maps for Effective Geoscience Career Planning and Development

    Science.gov (United States)

    Keane, C. M.; Wilson, C. E.; Houlton, H. R.

    2013-12-01

    One of the greatest challenges faced by students and new graduates is the advice that they must take charge of their own career planning. This is ironic as new graduates are least prepared to understand the full spectrum of options and the potential pathways to meeting their personal goals. We will examine the rationale, tools, and utility of an approach aimed at assisting individuals in career planning nicknamed a "tube map." In particular, this approach has been used in support of geoscientist recruitment and career planning in major European energy companies. By utilizing information on the occupational sequences of geoscience professionals within an organization or a community, a student or new hire can quickly understand the proven pathways towards their eventual career goals. The tube map visualizes the career pathways of individuals in the form of a subway map, with specific occupations represented as "stations" and pathway interconnections represented as "transfers." The major application of this approach in the energy sector was to demonstrate both the logical career pathways to either senior management or senior technical positions, as well as present the reality that time must be invested in "lower level" jobs, thereby nullifying a persistent overinflated sense of the speed of upward mobility. To this end, we have run a similar occupational analysis on several geoscience employers, including one with somewhat non-traditional geoscience positions and another that would be considered a very traditional employer. We will examine the similarities and differences between the resulting 'tube maps,' critique the tools used to create the maps, and assess the utility of the product in career development planning for geoscience students and new hires.

  19. FY 2000 report on the survey of the development of high efficiency photoelectric conversion compounds. Plan on the Light for the 21st Century; 2000 nendo kokoritsu denko henkan kagobutsu handotai kaihatsu seika hokokusho. 21 seiki no akari keikaku

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    The paper described the results of the FY 2000 R and D on the Plan on the Light for the 21st Century. For the purpose of developing the white light emitting diode lighting technology, the results were obtained in the following four items: 1) basic study on the light emitting mechanism; 2) epitaxial growth in blue light/ultra violet LED and evaluation of LED characteristics; 3) substrates and characteristics for homo-epitaxial growth; 4) basic characteristics of phosphor and white light LED lighting use light source. In 1), for the purpose of clarifying the light emitting mechanism in InGaN mixed crystal semiconductor and InGaN/GaN quantum well structure, temperature dependency of time resolved light emitting spectroscopy and selective excitation light emitting spectroscopy was measured to get information/knowledge. In 2), evaluated were characteristics of multi-quantum well UV-LED composed of AlGaN/InGaN. In 3), in the GaN crystal growth by the pressure control solution growth method, studied were effects of the increasing speed of nitrogen pressure on the size of GaN monocrystal and the surface state. In 4), verified were the measuring method of quantum efficiency of three primary color phosphor materials and problems on the measured values. (NEDO)

  20. Development of a master plan for industrial solid waste management

    International Nuclear Information System (INIS)

    Karamouz, M.; Zahraie, B.; Kerachian, R.; Mahjouri, N.; Moridi, A.

    2006-01-01

    Rapid industrial growth in the province of Khuzestan in the south west of Iran has resulted in disposal of about 1750 tons of solid waste per day. Most of these industrial solid wastes including hazardous wastes are disposed without considering environmental issues. This has contributed considerably to the pollution of the environment. This paper introduces a framework in which to develop a master plan for industrial solid waste management. There are usually different criteria for evaluating the existing solid waste pollution loads and how effective the management schemes are. A multiple criteria decision making technique, namely Analytical Hierarchy Process, is used for ranking the industrial units based on their share in solid waste related environmental pollution and determining the share of each unit in total solid waste pollution load. In this framework, a comprehensive set of direct, indirect, and supporting projects are proposed for solid waste pollution control. The proposed framework is applied for industrial solid waste management in the province of Khuzestan in Iran and a databank including GIS based maps of the study area is also developed. The results have shown that the industries located near the capital city of the province, Ahwaz, produce more than 32 percent of the total solid waste pollution load of the province. Application of the methodology also has shown that it can be effectively used for development of the master plan and management of industrial solid wastes

  1. [Development of human resources and the Plan of Action].

    Science.gov (United States)

    Vidal, C

    1984-01-01

    This article (whose first part was published in the previous issue of Educación Médica y Salud) concludes an exhaustive review of manpower development in the Americas. This part considers the specific measures in this field enunciated in the Plan of Action; these measures pertain to four main areas: planning and programming of human resources, training in priority areas, utilization of human resources, and educational technology. The author discusses the present and future possibilities and obstacles of each of these activities and the steps to be taken to bring needs into line with real situations. It is of paramount importance that the national health authorities clearly spell out their policies for the development of human resources in the health field within the framework of general development policies. Another point to be insisted upon is the multiprofessional and multidisciplinary training of the health team and the importance of the education-service-supervision function, which usually results in permanent and continuing education, which in turn optimizes the utilization of personnel. However, none of this will be possible without an appropriate education technology with which to innovate, analyze and refine the entire education process and so meet the needs of both society and the health services.

  2. Northwest Hazardous Waste Research, Development, and Demonstration Center: Program Plan

    International Nuclear Information System (INIS)

    1988-02-01

    The Northwest Hazardous Waste Research, Development, and Demonstration Center was created as part of an ongoing federal effort to provide technologies and methods that protect human health and welfare and environment from hazardous wastes. The Center was established by the Superfund Amendments and Reauthorization Act (SARA) to develop and adapt innovative technologies and methods for assessing the impacts of and remediating inactive hazardous and radioactive mixed-waste sites. The Superfund legislation authorized $10 million for Pacific Northwest Laboratory to establish and operate the Center over a 5-year period. Under this legislation, Congress authorized $10 million each to support research, development, and demonstration (RD and D) on hazardous and radioactive mixed-waste problems in Idaho, Montana, Oregon, and Washington, including the Hanford Site. In 1987, the Center initiated its RD and D activities and prepared this Program Plan that presents the framework within which the Center will carry out its mission. Section 1.0 describes the Center, its mission, objectives, organization, and relationship to other programs. Section 2.0 describes the Center's RD and D strategy and contains the RD and D objectives, priorities, and process to be used to select specific projects. Section 3.0 contains the Center's FY 1988 operating plan and describes the specific RD and D projects to be carried out and their budgets and schedules. 9 refs., 18 figs., 5 tabs

  3. Environmental Development Plan (EDP): magnetohydrodynamics program, FY 1977

    International Nuclear Information System (INIS)

    1978-03-01

    This magnetohydrodynamics (MHD) EDP identifies and examines the environmental, health, and safety issues concerning the development of the ERDA Magnetohydrodynamics Program, the environmental activities needed to resolve these issues, applicable ongoing and completed research, and a time-phased action plan for the evaluation and mitigation of environmental impacts. A schedule for environmental research, assessment, and other activities is laid out. The purpose of the EDP is to identify environmental issues and to specify actions to ensure the environmental acceptability of commercial energy technologies being developed by ERDA. The EDP also will assist in coordinating ERDA's environmental activities with those of other government agencies. This document addresses the following technologies associated with ERDA's MHD program: (1) open-cycle magnetohydrodynamics; (2) closed-cycle plasma magnetohydrodynamics; and (3) closed-cycle liquid metal magnetohydrodynamics. The proposed environmental action plan is designed to meet the following objectives: (1) develop methods for monitoring and measuring emissions; (2) characterize air emissions, water effluents, and solid wastes from MHD; (3) determine potential environmental impacts and health hazards associated with MHD; (4) model pollutant transport and transformation; (5) ensure adequate control of pollutant emissions; (6) identify and minimize occupational health and safety hazards; (7) prepare NEPA compliance documents; and (8) assess the environmental, health, and safety impacts of the commercialized industry. This EDP will be updated and revised annually to take into account the progress of technologies toward commercialization, the environmental work accomplished, and the resolution of outstanding environmental issues concerning the technologies

  4. City Planning Evolution - Urban Development Directions in the Transition Period

    Directory of Open Access Journals (Sweden)

    Mircea Grigorovschi

    2010-03-01

    Full Text Available Urban evolution post 1989 has a series of specific characteristics mainly on a spatial-territorial plane. Determination of the main developing factors and urban evolution directions (dimensions, rhythm, expansion level, centrifugal and axial character, concentric, centripetal, functional evolution, tendencies and social implications, etc. represents a necessity and obligation for action from professionals in urban and landscaping fields. This necessity even arises from the perspective of the need for realizing strategies, planning, documentation and urban studies, which must intervene correctively in the evolution of areas with structural problems and to guide urban evolution towards the main goal namely the growth in residential quality of life in human settlements.

  5. Development of a biogas planning tool for project owners

    DEFF Research Database (Denmark)

    Fredenslund, Anders Michael; Kjær, Tyge

    are considered: Combined heat and power and natural gas grid injection. The main input to the model is the amount and types of substrates available for anaerobic digestion. By substituting the models’ default values with more project specific information, the model can be used in a biogas projects later phases......A spreadsheet model was developed, which can be used as a tool in the initial phases of planning a centralized biogas plant in Denmark. The model assesses energy production, total plant costs, operational costs and revenues and effect on greenhouse gas emissions. Two energy utilization alternatives...

  6. Standard Review Plan Update and Development Program. Implementing Procedures Document

    Energy Technology Data Exchange (ETDEWEB)

    1992-05-01

    This implementing procedures document (IPD) was prepared for use in implementing tasks under the standard review plan update and development program (SRP-UDP). The IPD provides comprehensive guidance and detailed procedures for SRP-UDP tasks. The IPD is mandatory for contractors performing work for the SRP-UDP. It is guidance for the staff. At the completion of the SRP-UDP, the IPD will be revised (to remove the UDP aspects) and will replace NRR Office Letter No. 800 as long-term maintenance procedures.

  7. European and national network development plan; Europaeischer und nationaler Netzentwicklungsplan

    Energy Technology Data Exchange (ETDEWEB)

    Ringel, Uwe [ONTRAS - VNG Gastransport GmbH, Leipzig (Germany)

    2011-11-15

    Even today, in the energy mix natural gas makes a significant contribution in order to achieve the climate policy goals. Thus, natural gas transmission grids will play a key role in Europe's energy supply. With the possibility of transforming excess wind power to hydrogen or synthetic methane and feeding syngas into the natural gas transmission grid, the natural gas transmission grid receive another challenging role in the future energy mix. However, this requires new approaches to all parties. In particular, consideration on the development of electricity networks in the planning of the future natural gas infrastructure have to be included.

  8. Proposed plan for the development of advanced instrumentation and control technology in Korea

    International Nuclear Information System (INIS)

    Kwon, Kee-Choon; Ham, Chang-Shik

    1995-01-01

    All of the nuclear power plants in Korea are operating with analog instrumentation and control (I and C) equipment which are increasingly faced with frequent troubles, obsolescence and high maintenance expense. Electrical and computer technology has improved rapidly in recent years and has been applied to other industries. So it is strongly recommended to adopt the modern digital and computer technology to improve plant safety and availability. The plan, which is aimed at replacement of existing I and C systems, and at improving planned as well as next generation digital I and C systems is divided into three major parts: (1) Plan for domestic design of I and C systems and components, (2) Plan for domestic manufacturing of I and C equipment, and (3) Plan for development of future technologies. This plan provides advanced digital I and C requirements equivalent to Electric Power Research Institute Utility Requirements Document (Chapter 10) Man Machine Interface Systems. Also this plan includes the critical issue of digital I and C, namely software verification and validation strategy. (6 refs., 1 fig., 2 tabs.)

  9. Safe Maritime Autonomous Path Planning in a High Sea State

    Science.gov (United States)

    Ono, Masahiro; Quadrelli, Marco; Huntsberger, Terrance L.

    2014-01-01

    This paper presents a path planning method for sea surface vehicles that prevents capsizing and bow-diving in a high sea-state. A key idea is to use response amplitude operators (RAOs) or, in control terminology, the transfer functions from a sea state to a vessel's motion, in order to find a set of speeds and headings that results in excessive pitch and roll oscillations. This information is translated to arithmetic constraints on the ship's velocity, which are passed to a model predictive control (MPC)-based path planner to find a safe and optimal path that achieves specified goals. An obstacle avoidance capability is also added to the path planner. The proposed method is demonstrated by simulations.

  10. [Effect of development of rural commodity economy on family planning].

    Science.gov (United States)

    Chen, X

    1986-05-01

    The paper discusses the effects of the changes of rural income level on family planning practice based a survey of 200 rural families in a affluent vegetable producing area of suburban Beijing. In 1984, 99.7% of child birth followed the local birth planning, and 99.1% of families with one child received One Child Certificates. The annual per capita income of the 200 families was 1,092 yuan (1 US$ = 3.7 yuan) in 1984 even higher than the community average. The number of children was negatively associated with the per capita income and per capita consumption except families with 4 children, most of whom have grown up. The rural mechanization in the community has greatly increased the need for skills and technology rather than strong laborers. The provision of community welfare programs and the increased living standard changed the value of children and also changed people's perception in favor of gender equality. Among families with 1 or 2 children, most preferred to have girls. And among families with more children, the preferred family size is smaller than the actual size, which shows a tendency towards favoring a small family. Among 1 child families, 58.7% considered 1 boy and 1 girl to be ideal, and 37.7% was happy with the only child. As the community becomes richer, both the community and individual families increased their investment in education. The spending on education per child was over 2 times as high in 1 child families than the families with more children. The educational status of parents is positively associated with the exception of children's future education and current spending on education. The concern of parents over children's education is an important factor in improving the quality of labor force. Women of higher education status are more acceptable to contraception and family planning policy. The relatively high level of education of the community has been conducive to it fertility decline.

  11. Changing Perspectives on the Planning of Ankara (1924-2007 and Lessons for a New Master-Planning Approach to Developing Cities

    Directory of Open Access Journals (Sweden)

    Olgu Çalişkan

    2014-07-01

    Full Text Available As one of the newly planned capitals in the 20th century – like Islamabad, Canberra and Brazil –, Ankara represents an original case in planning history: from shaping a new town under the influence of early European urbanism to the control of a dynamic metropolitan form by structural planning approaches. Forming its urban core according to the initial planning perspectives between the beginning of 1930s and the mid-1970s, the city has entered a rapid phase of space production in its extensions for about the last thirty years.In the current period of development, highly fragmented urban peripheral formation has being occurred in Ankara. Since the existing trend on the dispersion of urban form lacking spatial coherence at different scale-levels causes the dominance of the private domain and a loss of urbanity, this trend might at first glance be considered as a break with the European tradition and the emergence of Anglo-Americanization in Turkish planning system in terms of looser development control approach on urban form.Before, coming to such a critical end-point, the paper prefers a closer look into the changing dynamics of master plans of the city. It is aimed to reveal the developmental logic of the city by means of master plan analysis. The comprehensive outlook – called plan matrix – is integrated into each master plan schema by correlating the basic components like main policy directions, depth of control, settlement typology, and city structure and form. Such a framework has a potential to be utilized for any kind of plan analysis at metropolitan scale for different cases. At the end of the analysis, the paper tends to address an alternative master planning approach for the similar types of developing cities striving for keeping its urban character within a fragmented urban body.

  12. Results from the Macedonian power system development planning

    International Nuclear Information System (INIS)

    Volkanovski, A.; Bosevski, T.; Todorovski, M.

    2000-01-01

    In this paper we present the results from the development planning of the Macedonian power system for the period 2001-2020. Taking into account the fact that one can not consider construction of new power generating units on domestic lignite due to its shortage, development of the national power system can be supported by utilisation of hydro potential, natural gas within the capabilities of the existing gas pipeline and nuclear energy. The crucial year in the planning period will be the year when reduction of the lignite utilisation in the existing thermal plants will take place, which will cause construction of new units with significant capacities. We have analysed two possibilities for inclusion od nuclear plant, optimal based on the economical criteria and forced with delay of the on-line year of the nuclear plant starting from the optimal year for its construction (2014 which was obtained from the WASP optimisation procedure) and ending with the year 2021 (one year beyond the study period). (author)

  13. Leadership development and succession planning in case management.

    Science.gov (United States)

    Miodonski, Kathleen; Hines, Patricia

    2013-01-01

    The director of case management is one of health care's leadership positions most frequently in demand. The lack of qualified and effective case management leaders will continue to be an issue for organizations for years to come, influenced by increasing pressures on health care reimbursement and the aging case management workforce. Organizations have an opportunity to create a program to develop future case management leaders from their internal talent. The proposed strategies are designed for the acute care hospital but also have applicability in other health care settings where there are case managers and a need for case management leadership. The business community offers leadership research and leadership development models with relevance to case management. Identifying and developing internal talent for leadership roles has been proven to be effective in preparation for advanced responsibilities, has a positive effect on staff morale, and minimizes the impact of vacant leadership positions during recruitment and onboarding activities. Creating a case management leadership development program for an organization can be an alternative to the process of external recruitment for case management department leaders. Such a program can be undertaken even in today's budget conscious environment by accessing existing resources in an organization in a creative and organized manner. The authors outline an approach for case management leaders to accept responsibility for succession planning and for case managers to accept responsibility for promoting their own career development through creation of a leadership development program.

  14. Sign up to Safety: developing a safety improvement plan.

    Science.gov (United States)

    Dight, Carol; Peters, Hayley

    2015-04-01

    The Sign up to Safety (SutS) programme was launched in June 2014 by health secretary Jeremy Hunt. It focuses on listening to patients, carers and staff, learning from what they say when things go wrong, and then taking action to improve patient safety. The programme aims to make the NHS the safest healthcare system in the world by creating a culture devoted to continuous learning and improvement (NHS England 2014). Musgrove Park Hospital, part of Taunton and Somerset NHS Foundation Trust, was one of 12 NHS organisations that signed up to the SutS programme, making public its commitment to the national pledges to be 'open and transparent' and to develop a safety improvement plan. This paper describes the development of the strategy.

  15. Development of inverse-planning system for neutron capture therapy

    International Nuclear Information System (INIS)

    Kumada, Hiroaki; Yamamoto, Kazuyoshi; Maruo, Takeshi

    2006-01-01

    To lead proper irradiation condition effectively, Japan Atomic Energy Agency (JAEA) is developing an inverse-planning system for neutron capture therapy (NCT-IPS) based on the JAEA computational dosimetry system (JCDS) for BNCT. The leading methodology of an optimum condition in the NCT-IPS has been applied spatial channel theory with adjoint flux solution of Botzman transport. By analyzing the results obtained from the adjoint flux calculations according to the theory, optimum incident point of the beam against the patient can be found, and neutron spectrum of the beam which can generate ideal distribution of neutron flux around tumor region can be determined. The conceptual design of the NCT-IPS was investigated, and prototype of NCT-IPS with JCDS is being developed. (author)

  16. Developing a Strategic Plan for NASA JSC's Technology Investments

    Science.gov (United States)

    Stecklein, Jonette M.

    2012-01-01

    Human space exploration has always been heavily influenced by goals to achieve a specific mission on a specific schedule. This approach drove rapid technology development, the rapidity of which adds risks as well as provides a major driver for costs. The National Aeronautics and Space Administration (NASA) is now approaching the extension of human presence throughout the solar system by balancing a proactive yet less schedule-driven development of technology with opportunistic scheduling of missions as the needed technologies are realized. This approach should provide cost effective, low risk technology development that will enable efficient and effective manned spaceflight missions. As a first step, the NASA Human Spaceflight Architecture Team (HAT) has identified a suite of critical technologies needed to support future manned missions across a range of destinations, including in cislunar space, near earth asteroid visits, lunar exploration, Mars space, and Mars exploration. The challenge now is to develop a strategy and plan for technology development that efficiently enables these missions over a reasonable time period, without increasing technology development costs unnecessarily due to schedule pressure, and subsequently mitigating development and mission risks. NASA fs Johnson Space Center (JSC), as the nation's primary center for human exploration, is addressing this challenge through an innovative approach allocating Internal Research and Development funding to projects that have been prioritized using four focus criteria, with appropriate importance weighting. These four focus criteria are the Human Space Flight Technology Needs, JSC Core Technology Competencies, Commercialization Potential, and Partnership Potential. The inherent coupling in these focus criteria have been captured in a database and have provided an initial prioritization for allocation of technology development research funding. This paper will describe this process and this database

  17. Designing a strategic plan development approach for integrated area development projects

    NARCIS (Netherlands)

    de Kort, Inge

    2009-01-01

    Increasingly, it has become evident that spatial problems can no longer be resolved in isolation, but should be solved in conjunction with other development-related issues. Interest in integrated area development is growing, and a more integrated planning approach is desired. In this design-based

  18. Power generation capacity planning under budget constraint in developing countries

    International Nuclear Information System (INIS)

    Afful-Dadzie, Anthony; Afful-Dadzie, Eric; Awudu, Iddrisu; Banuro, Joseph Kwaku

    2017-01-01

    Highlights: • A long term stochastic GEP model with budget constraint is developed. • Model suitable for analyzing GEP problems in developing countries. • Model determines optimal mix, size and timing of future generation capacity needs. • A real case study of the Ghana GEP problem was employed. • Insufficient budget leads to costly generation capacity expansion plans. - Abstract: This paper presents a novel multi-period stochastic optimization model for studying long-term power generation capacity planning in developing countries. A stylized model is developed to achieve three objectives: (1) to serve as a tool for determining optimal mix, size and timing of power generation types in the face of budget constraint, (2) to help decision makers appreciate the consequences of capacity expansion decisions on level of unserved electricity demand and its attendant impact on the national economy, and (3) to encourage the habit of periodic savings towards new generation capacity financing. The problem is modeled using a stochastic mixed-integer linear programming (MILP) technique under demand uncertainty. The effectiveness of the model, together with valuable insights derived from considering different levels of budget constraints are demonstrated using Ghana as a case study. The results indicate that at an annual savings equivalent to 0.75% of GDP, Ghana could finance the needed generation capacity to meet approximately 95% of its annual electricity demand between 2016 and 2035. Additionally, it is observed that as financial constraint becomes tighter, decisions on the mix of new generation capacities tend to be more costly compared to when sufficient funds are available.

  19. Rural planning organizations--their role in transportation planning and project development in Texas : technical report.

    Science.gov (United States)

    2010-10-01

    While a formal planning and programming process is established for urbanized areas through Metropolitan : Planning Organizations, no similar requirement has been established for rural areas. Currently, under the : Safe, Accountable, Flexible, Efficie...

  20. Development of the High Energy Linac Systems

    International Nuclear Information System (INIS)

    Cho, Yong Sub; Kwon, Hyeok Jung; Kim, Han Sung; Chung, Byung Chul; Jang, Ji Ho; Gao, Changgi; Li, Yingmin; Sun, An; Tang, Yazhe; Zhang, Lipoing; Hwang, Yong Seok

    2008-05-01

    The main purpose of this project is studying the extension plan of the proton engineering frontier project (PEFP) 100-MeV Linac. It includes three categories. One is studying operation plan of the PEFP linac and its extended accelerators, and developing a distribution system of 100-MeV proton beams with a laser striping. Other is designing superconducting RF (SRF) modules and fabricating and testing a copper cavity model. The other is designing a rapid cycling synchrotron (RCS). The operation scheme of the PEFP linac is related to the optimization in the operation of the 100-MeV linac, 200-MeV SRF, and RCS. We studied several operational method to increase the validity of the accelerators. The beam distribution system has two roles. One is supplying proton beams of 100 MeV to the user group. The laser stripping of the negative hydrogen atoms is used in this case. The other beams are directed to the next high energy accelerators. This study contributes to increase the availability of the proton beams. The SRF is one of candidates to extend the PEFP linac system. Since the accelerating gradient of the SRF is much higher than the normal conducting accelerator, a lot of institutes over the world are developing the SRF structure. Main purposes are designing an SRF module, fabricating and testing an copper model which has similar material properties as Nb of the usual SRF cavity material. The RCS is a synchrotron whose injector is the PEFP 100-MeV linac. Main purposes are determining the lattice structure, studying the fast and slow extraction system, simulating beam behavior in the designed synchrotron. The RCS will be used as the spallation neutron source and tools in the basic and applied science including medical application

  1. The Role of Environmentally Conscious Architecture and Planning As Components of Future National Development Plans in Egypt

    Directory of Open Access Journals (Sweden)

    Karim M. Ayyad

    2013-10-01

    Full Text Available Egypt has been experiencing challenging economic, social and political disturbance during the end of the twentieth century and towards the beginning of the twenty-first. With its fast expanding population, high consumption rate and economic deficit, the Egyptian community continues to experience a low quality of living. These issues contributed greatly to the uprising, following the Tunisian model, in January, 2011. However, the political change that followed did not help a lot, as development strategies are still far from being sustainable. In the beginning of the millennium, Egypt experienced an 8.6% energy deficit, followed by a growing energy crisis [1]. Knowing that almost 50% of the energy produced in Egypt is consumed inside buildings [2], environmentally conscious architecture can be a very powerful tool in development plans, as it can reasonably reduce the consumption of energy and other resources and enhance the quality of living for people. This work analyzes the supposed role of environmentally conscious architecture and, hence, evaluates its importance as a major component of national development plans in the near future. The analysis encompasses a review of the status quo in terms of consumption patterns and required services and, then, compares it with the case in which environmentally conscious architecture is adopted.

  2. Transport Canada's sustainable development action plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-09-30

    Transport Canada's sustainable development strategy, tabled in the House of Commons in December 1997, sets out the direction for the Department to integrate environmental concerns with safety and efficiency in developing policies and programs and in carrying out its day-to-day activities. While recognizing that moving towards sustainable development is a long-term undertaking, the department is determined to turn 'words' into 'work'. The action plan outlined in this document is organized according to the challenges laid out in the original Sustainable Development Strategy document. Accordingly, the department shall endeavour to minimize risk of environmental damage from transportation accidents; promote greening of operations in the transportation sector; reduce emissions of hazardous substances from transportation sources; promote education and awareness on sustainable transportation; refine sustainable performance indicators; and develop and promote the application of cleaner transportation systems and transportation technologies. The bulk of the report is devoted to brief summaries of progress achieved in each of these areas to date.

  3. High-level radioactive waste repositories site selection plan

    International Nuclear Information System (INIS)

    Castanon, A.; Recreo, F.

    1985-01-01

    A general vision of the high level nuclear waste (HLNW) and/or nuclear spent fuel facilities site selection processes is given, according to the main international nuclear safety regulatory organisms quidelines and the experience from those countries which have reached a larger development of their national nuclear programs. (author)

  4. Center Planning and Development Student Engineer at KSC

    Science.gov (United States)

    Jenkins, Kenneth T., Jr.

    2015-01-01

    This summer I was the Student Trainee (Engineering) Pathways Intern (co-op) at the Kennedy Space Center (KSC) in the Center Planning & Development (CPD) Directorate. CPD works with commercial companies who are interested in using KSC's unique capabilities for spaceflight, spacecraft processing, ground systems and Research & Development (R&D) projects that fall in line with NASA's Mission and Vision. CPD is divided into three (3) groups: (1) AD-A, which works on the Master Planning for the center, (2) AD-B (where I am), which works on project control, management and integration, and (3) AD-C, which works on partnership development. CPD's main goal is to make KSC the world's preeminent multi-user spaceport and maintain the center as a leader in space exploration. CPD is a very diverse group of employees having a wide knowledge of not only the Space Shuttle, but also Expendable Launch Vehicles (ELV). The director of CPD, Scott Colloredo, is on the advisory board for Commercial Space Operations (CSO) and has a degree from ERAU. I worked on a number of different tasks for AD-B, as well as CPD, that includes, but not limited to: reviewing and reissuing engineering documents, weekly notes for CPD and senior management, engineering familiarizations with facilities at KSC, leading a tour for the Embry-Riddle Aeronautical University Career Services office, and working on actual agreements/proposals that will be used in the partnership process with multiple partners, along with other projects. Most of the work I have done is sensitive information and cannot be disclosed.

  5. 75 FR 69698 - Central Valley Project Improvement Act, Criteria for Developing Refuge Water Management Plans

    Science.gov (United States)

    2010-11-15

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Criteria for Developing Refuge Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The ``Criteria for Developing Refuge Water Management Plans'' (Refuge...

  6. Marketing plan for the introduction of a new high-end detection tool

    OpenAIRE

    Gibernau Torres, Alvaro

    2010-01-01

    The folowing master thesis focuses on the development of the marketing plan for a new high-end radar based detection tool. It was written in colaboration with Hilti Corp., one of the leading manufacturers of detection systems in the worldwide building construction industry. The purpose of this paper is to define the marketing mix (product, price, placement, and promotion) in order to present the market-entry strategy and eventualy become the most important ...

  7. Environmental Development Plan (EDP). Enhanced gas recovery, FY 1977

    Energy Technology Data Exchange (ETDEWEB)

    1978-03-01

    This Enhanced Gcs Recovery EDP addresses the environmental impacts of enhanced gas recovery processes in shale and sandstone, methane drainage from coalbeds, and methane recovery from geopressured aquifers. The EDP addresses planning in two basic areas: environmental research and environmental assessment. Environmental research can be categorized as follows: characterization of pollutants from EGR processes; selective application of monitoring and measuring techniques; evaluation of control/mitigation techniques; and evaluation of the synergistic impacts of the development of EGR techniques. Environmental assessment activities scheduled by EDP include: assessment of ecological impacts; assessment of socioeconomic effects; EIA/EIS preparation; evaluation of control technology needs; and analysis of applicable and proposed emission, effluent, and health and safety standards. The EGR EDP includes an EGR technology overview (Section 2), a discussion of EGR environmental issues and requirements (Section 3), an environmental action plan (Section 4), an environmental management strategy for the EGR program (Section 5), and supporting appendices which present information on Federal legislation applicable to EGR technology, a summary of ongoing and completed research, and future research and assessment projects.

  8. The Strategic Plan for Tourism Development in Italy

    Directory of Open Access Journals (Sweden)

    Silvia ANGELONI

    2013-06-01

    Full Text Available Conceptual works on tourism destination competitiveness affirm the central importance of planning the process of value creation within destination. Italy is an emblematic case of why and how a leading tourism destination may lose competitiveness along the years. Up to the 1980s Italy was in fact the top international tourism destination, but then such ranking gradually decreased, because of more complexity of sector and, over all, because of marginality of tourism in the government agenda and more in general of the country. After years of strategic myopia, Italy finally has a tool that formalizes its vision and indicates the key factors that can be leveraged in order to regain ground. In 2013, Italy adopted a National Strategic Plan. Therefore, this paper aims to describe an important turning point in tourism policies for the economic and cultural development of Italy. The research highlights the problematic areas of Italy’s tourism industry and explains how a new approach should make the Italian destination able to successfully compete on the international tourism market.

  9. The U.S. Magnet Development Program Plan

    CERN Document Server

    Gourlay, Stephen; Zlobin, Alexander; Cooley, Lance; Larbalestier, David

    2016-01-01

    The 2014 Particle Physics Project Prioritization Panel (P5) Report identified a critical need for transformational high field magnet R&D focused on substantially increasing performance and lowering the cost per T-m. This need was subsequently reiterated in the HEPAP* Accelerator R&D subpanel report. In response, the DOE Office of High Energy Physics has initiated an ambitious program, coordinated by LBNL (see Appendix A), to aggressively pursue the development of superconducting accelerator magnets that operate as closely as possible to the fundamental limits of superconducting materials and at the same time minimize or eliminate magnet training. The U.S. Magnet Development Program (MDP) is based on four goals that summarize the P5 and Subpanel recommendations. These goals will be achieved by focusing on high field dipole development along four elements. The first element aims at the establishment of a baseline design to demonstrate feasibility of 16 T magnets and the development of higher risk innova...

  10. The socio-economic costs of the planned development of wind power energy

    International Nuclear Information System (INIS)

    Bentzen, J.

    1992-01-01

    The socio-economic consequences of the Danish government's planned further development of wind power energy are discussed in detail. It is claimed that, currently, electricity produced by wind turbines is more expensive than that produced by power stations, if the relative environmental effects are not taken into consideration. It is expected that technological development will contribute to cost reduction by the year 2010 so that electricity produced by wind turbines will be competitive, but until then costs of wind power energy will be high and it is reckoned that losses will be in the range of 5-6 billion Danish crowns, minus 2.5 billion saved by lack of CO 2 emission. The socio-economic factors regarding windmills of various sizes (150 kW and 225 kW) are calculated and the planned development of wind power until 2010 is explained. The socio-economic costs of the development programme under various conditions, including the calculation of the saved emissions of carbon dioxide, are discussed. The author states that, in the light of these arguments, he is not in agreement with the governmental plan for the development of wind-turbine produced electricity. It is suggested that this plan could be postponed until such time as wind-power produced electricity should be more competitive in price, and that it should not be pursued during a period of economic recession. (AB)

  11. Turkey's regulatory plans for high enriched to low enriched conversion of TR-2 reactor core

    International Nuclear Information System (INIS)

    Guelol Oezdere, Oya

    2003-01-01

    Turkey is a developing country and has three nuclear facilities two of which are research reactors and one pilot fuel production plant. One of the two research reactors is TR-2 which is located in Cekmece site in Istanbul. TR-2 Reactor's core is composed of both high enriched and low enriched fuel and from high enriched to low enriched core conversion project will take place in year 2005. This paper presents the plans for drafting regulations on the safety analysis report updates for high enriched to low enriched core conversion of TR-2 reactor, the present regulatory structure of Turkey and licensing activities of nuclear facilities. (author)

  12. Guide to Developing an Environmental Management System - Plan

    Science.gov (United States)

    This page takes you though the basic steps (Plan, Do, Check, Act) of building an Environmental Management System (EMS) as they are outlined in the 2001 Second Edition of Environmental Management Systems: An Implementation Guide. Plan section.

  13. Developing a planning tool for South African prosecution resources ...

    African Journals Online (AJOL)

    Strategic planning, forecasting, simulation, resource planning, prosecution ... whether a case should and can be prosecuted, what charges to prosecute .... various activities in the court environment, were the recently built discrete-event simula-.

  14. Plan for developing a comprehensive energy manpower information system

    Energy Technology Data Exchange (ETDEWEB)

    Stewart, Lawrence G.

    1979-09-01

    The report is designed to make a beginning in broadening the scope of the comprehensive manpower information system for energy research, development, and demonstration, so that it could cover all manpower related to energy. It develops a plan for this extension, including determining which taxonomies require change, specifying the subsequent stages involved in expanding CEMIS to all energy manpower, and providing the basis for cost estimates for this work. The report is organized as follows: The analytical rationale is described in Chapter II. Chapter III reviews the status of manpower data in a number of energy sectors, notes limitations and gaps in the data, and discusses improvements and additions that should be made. The scope and structure of CEMIS are laid out in Chapter IV, with particular reference to the development of analytical processes, and of analytical linking functions between bodies of data, and a description of their application in anticipating the employment impact of energy changes. The appropriate steps recommended for the further development of CEMIS are described in Chapter V.

  15. Planning the development of the Mekong river basin

    Energy Technology Data Exchange (ETDEWEB)

    Chomchai, P [Mekong Secretariat, Bangkok (Thailand)

    1992-10-01

    In planning to develop the vast potential of the Mekong river in Southeast Asia, a number of institutional aspects need to be addressed, and the sometimes diverging interests of the riparian countries need to be carefully balanced. The Mekong river is an extremely valuable natural resource: its potential for irrigation, hydropower, navigation, fisheries and related development is more than adequate to raise significantly the standards of living of the people of the lower Mekong basin and in the riparian countries outside the river's catchment area. The Mekong's catchment area of 795 000 km[sup 2] encompasses parts of China and Myanmar, the whole of Laos and Cambodia, one third of Thailand and one fifth of Viet Nam. The population of the Mekong basin is around 100 million, about half of whom live in the lower basin. It could be said that these impoverished inhabitants of the basin depend significantly on the Mekong for an improvement in their livelihood, and this places a heavy responsibility on those involved in developing its water resources. The Mekong Committee, since its establishment in 1957 and in its present interim status since 1977, is dedicated to the co-ordinated development of the basin's resources, on the basis of reasonable and equitable sharing between the riparian states as stated in the Committee's declaration of principles. With the establishment of the Mekon Committee, serious efforts have been made aimed at rational management of water resources use. (author).

  16. Basic plan of partitioning and transmutation technology development

    International Nuclear Information System (INIS)

    Ikegami, Tetsuo; Ozawa, Masaki

    2003-04-01

    Basic plan of partitioning and transmutation technology development has been made in more detail and concrete manner in terms of development goal, nuclides to be portioned and to be transmuted, and development schedule, based on the pre-evaluation results of the Research Evaluation Committee on Research and development of partitioning and transmutation technology for long life nuclides' held in August 2000. A step by step approach, consists of three steps, to reach the goal of partitioning and transmutation technology has been adopted under the recognition that the partitioning and transmutation technology development should be progressed steadily as a long term them. The first step is supposed to be able to attain within about 5 years by the present technology and on the extension of it. Such researches as collective separation of TRU, MA/Ln effective separation, and irradiation experiment of iodine and technetium. The second step is such a goal that is expected to be able to realize the engineering feasibility, within about 15 years, through the progress of science technology in future, although the engineering feasibility is not sufficiently foreseen at present. It will need revolutionary technology or breakthrough. Nuclides to be partitioned and to be transmuted have been selected in view points of 'radioactivity and radio-toxicity', 'geological repository', and 'effective utilization', corresponding to the each step of the development goal. Collaboration with other research organizations and with universities in the world should be pursued. Especially, such collaborations with France, with which information exchange on JOYO/PHENIX irradiation experiments is progressing, and with USA, which has recently developed positive activities in this field, are strongly expected. (author)

  17. Comparison of selected foreign plans and practices for spent fuel and high-level waste management

    International Nuclear Information System (INIS)

    Schneider, K.J.; Mitchell, S.J.; Lakey, L.T.; Johnson, A.B. Jr.; Hazelton, R.F.; Bradley, D.J.

    1990-04-01

    This report describes the major parameters for management of spent nuclear fuel and high-level radioactive wastes in selected foreign countries as of December 1989 and compares them with those in the United States. The foreign countries included in this study are Belgium, Canada, France, the Federal Republic of Germany, Japan, Sweden, Switzerland, and the United Kingdom. All the countries are planning for disposal of spent fuel and/or high-level wastes in deep geologic repositories. Most countries (except Canada and Sweden) plan to reprocess their spent fuel and vitrify the resultant high-level liquid wastes; in comparison, the US plans direct disposal of spent fuel. The US is planning to use a container for spent fuel as the primary engineered barrier. The US has the most developed repository concept and has one of the earliest scheduled repository startup dates. The repository environment presently being considered in the US is unique, being located in tuff above the water table. The US also has the most prescriptive regulations and performance requirements for the repository system and its components. 135 refs., 8 tabs

  18. Comparison of selected foreign plans and practices for spent fuel and high-level waste management

    Energy Technology Data Exchange (ETDEWEB)

    Schneider, K.J.; Mitchell, S.J.; Lakey, L.T.; Johnson, A.B. Jr.; Hazelton, R.F.; Bradley, D.J.

    1990-04-01

    This report describes the major parameters for management of spent nuclear fuel and high-level radioactive wastes in selected foreign countries as of December 1989 and compares them with those in the United States. The foreign countries included in this study are Belgium, Canada, France, the Federal Republic of Germany, Japan, Sweden, Switzerland, and the United Kingdom. All the countries are planning for disposal of spent fuel and/or high-level wastes in deep geologic repositories. Most countries (except Canada and Sweden) plan to reprocess their spent fuel and vitrify the resultant high-level liquid wastes; in comparison, the US plans direct disposal of spent fuel. The US is planning to use a container for spent fuel as the primary engineered barrier. The US has the most developed repository concept and has one of the earliest scheduled repository startup dates. The repository environment presently being considered in the US is unique, being located in tuff above the water table. The US also has the most prescriptive regulations and performance requirements for the repository system and its components. 135 refs., 8 tabs.

  19. Computationally based methodology for reengineering the high-level waste planning process at SRS

    International Nuclear Information System (INIS)

    Paul, P.K.; Gregory, M.V.; Wells, M.N.

    1997-01-01

    The Savannah River Site (SRS) has started processing its legacy of 34 million gallons of high-level radioactive waste into its final disposable form. The SRS high-level waste (HLW) complex consists of 51 waste storage tanks, 3 evaporators, 6 waste treatment operations, and 2 waste disposal facilities. It is estimated that processing wastes to clean up all tanks will take 30+ yr of operation. Integrating all the highly interactive facility operations through the entire life cycle in an optimal fashion-while meeting all the budgetary, regulatory, and operational constraints and priorities-is a complex and challenging planning task. The waste complex operating plan for the entire time span is periodically published as an SRS report. A computationally based integrated methodology has been developed that has streamlined the planning process while showing how to run the operations at economically and operationally optimal conditions. The integrated computational model replaced a host of disconnected spreadsheet calculations and the analysts' trial-and-error solutions using various scenario choices. This paper presents the important features of the integrated computational methodology and highlights the parameters that are core components of the planning process

  20. Developing a Personal Financial Planning Program: More than Just Courses

    Science.gov (United States)

    Martin, Charles L., Jr.

    2007-01-01

    Personal financial planning is considered one of the major growth professions of the coming decade. Besides providing an opportunity for employment, a major in personal financial planning can open the door to a rewarding and challenging career. Career opportunities in the personal financial planning field include opening a private practice or…

  1. In situ sampling cart development engineering task plan

    International Nuclear Information System (INIS)

    DeFord, D.K.

    1995-01-01

    This Engineering Task Plan (ETP) supports the development for facility use of the next generation in situ sampling system for characterization of tank vapors. In situ sampling refers to placing sample collection devices (primarily sorbent tubes) directly into the tank headspace, then drawing tank gases through the collection devices to obtain samples. The current in situ sampling system is functional but was not designed to provide the accurate flow measurement required by today's data quality objectives (DQOs) for vapor characterization. The new system will incorporate modern instrumentation to achieve much tighter control. The next generation system will be referred to in this ETP as the New In Situ System (NISS) or New System. The report describes the current sampling system and the modifications that are required for more accuracy

  2. PFP issues/assumptions development and management planning guide

    International Nuclear Information System (INIS)

    SINCLAIR, J.C.

    1999-01-01

    The PFP Issues/Assumptions Development and Management Planning Guide presents the strategy and process used for the identification, allocation, and maintenance of an Issues/Assumptions Management List for the Plutonium Finishing Plant (PFP) integrated project baseline. Revisions to this document will include, as attachments, the most recent version of the Issues/Assumptions Management List, both open and current issues/assumptions (Appendix A), and closed or historical issues/assumptions (Appendix B). This document is intended be a Project-owned management tool. As such, this document will periodically require revisions resulting from improvements of the information, processes, and techniques as now described. Revisions that suggest improved processes will only require PFP management approval

  3. Development of an Integrated Agricultural Planning Model Considering Climate Change

    Science.gov (United States)

    Santikayasa, I. P.

    2016-01-01

    The goal of this study is to develop an agriculture planning model in order to sustain the future water use under the estimation of crop water requirement, water availability and future climate projection. For this purpose, the Citarum river basin which is located in West Java - Indonesia is selected as the study area. Two emission scenarios A2 and B2 were selected. For the crop water requirement estimation, the output of HadCM3 AOGCM is statistically downscale using SDSM and used as the input for WEAP model developed by SEI (Stockholm Environmental Institute). The reliability of water uses is assessed by comparing the irrigation water demand and the water allocation for the irrigation area. The water supply resources are assessed using the water planning tool. This study shows that temperature and precipitation over the study area are projected to increase in the future. The water availability was projected to increase under both A2 and B2 emission scenarios in the future. The irrigation water requirement is expected to decrease in the future under A2 and B2 scenarios. By comparing the irrigation water demand and water allocation for irrigation, the reliability of agriculture water use is expected to change in the period of 2050s and 2080s while the reliability will not change in 2020s. The reliability under A2 scenario is expected to be higher than B2 scenario. The combination of WEAP and SDSM is significance to use in assessing and allocating the water resources in the region.

  4. APPLICATION OF METHODOLOGY OF STRATEGIC PLANNING IN DEVELOPING NATIONAL PROGRAMMES ON DEVELOPMENT

    Directory of Open Access Journals (Sweden)

    Inna NOVAK

    2015-07-01

    Full Text Available Actuality: The main purpose of strategic planning is that long-term interests of sustainable development of a market economy require the use of effective measures of state regulation of economic and social processes. Objective: The aim of the article is determined to analyze the development of strategic planning methodology and practical experience of its application in the design of national development programs. Methods: When writing the article the following research methods were used: analysis and synthesis, target-oriented and monographic. Results: In Ukraine at the level of state and local government authorities strategies of development of branches, regions, cities, etc. are being developed but given the lack of state funding a unified investment strategy of the country is not developed. After analyzing development of the strategic planning methodology and examples of its application in the design of state development programs we identified the need to develop an investment strategy of the state (sectors, regions, etc., as due to defined directions and guidelines of the activity it will increase the investment level in the country and ensure national strategy “Ukraine-2020”.

  5. A complex of optimization problems in planning for the development of mining operations in coal mines

    Energy Technology Data Exchange (ETDEWEB)

    Todorov, A K; Arnaudov, B K; Brankova, B A; Gyuleva, B I; Zakhariyev, G K

    1977-01-01

    The system for planning for the development of coal mines is a complex of interrelated plan optimization, plan calculation and supporting (accounting-analytical and standards) tasks. An important point in this complex is held by the plan optimization tasks. The questions about the synthesis and the structural peculiarities of the system, the essence and machine realization of the tasks are examined.

  6. Demographic development, climatic change, peak oil. Answers to spatial planning, urban planning and traffic planning; Demografische Entwicklung, Klimawandel, Peak Oil. Antworten der Raum-, Stadt- und Verkehrsplanung

    Energy Technology Data Exchange (ETDEWEB)

    Huber, Felix

    2011-07-01

    The demographic trends, climate change and peak oil are highly sensitive issues politically. With fears about the future and the curiosity on the future attention can be aroused. Therefore, the author of the contribution under consideration reports on the following aspects: (1) Why should we deal with future challenges?; (2) Presentation of the tools of spatial planning, urban planning and transportation planning in the context of the particular requirements of their time; (3) Clarification of the requirements to future tools; (4) Presentation of the future tasks of spatial planning and the changes in lifestyle.

  7. Very high-energy electron (VHEE) beams in radiation therapy; Treatment plan comparison between VHEE, VMAT, and PPBS.

    Science.gov (United States)

    Schüler, Emil; Eriksson, Kjell; Hynning, Elin; Hancock, Steven L; Hiniker, Susan M; Bazalova-Carter, Magdalena; Wong, Tony; Le, Quynh-Thu; Loo, Billy W; Maxim, Peter G

    2017-06-01

    The aim of this study was to evaluate the performance of very high-energy electron beams (VHEE) in comparison to clinically derived treatment plans generated with volumetric modulated arc therapy (VMAT) and proton pencil beam scanning (PPBS) technology. We developed a custom optimization script that could be applied automatically across modalities to eliminate operator bias during IMRT optimization. Four clinical cases were selected (prostate cancer, lung cancer, pediatric brain tumor, and head and neck cancer (HNC)). The VHEE beams were calculated in the EGSnrc/DOSXYZnrc Monte Carlo code for 100 and 200 MeV beams. Treatment plans with VHEE, VMAT, and PPBS were optimized in a research version of RayStation using an in-house developed script to minimize operator bias between the different techniques. The in-house developed script generated similar or superior plans to the clinically used plans. In the comparisons between the modalities, the integral dose was lowest for the PPBS-generated plans in all cases. For the prostate case, the 200 MeV VHEE plan showed reduced integral dose and reduced organ at risk (OAR) dose compared to the VMAT plan. For all other cases, both the 100 and the 200 MeV VHEE plans were superior to the VMAT plans, and the VHEE plans showed better conformity and lower spinal cord dose in the pediatric brain case and lower brain stem dose in the HNC case when compared to the PPBS plan. The automated optimization developed in this study generated similar or superior plans as compared to the clinically used plan and represents an unbiased approach to compare treatment plans generated for different modalities. In the present study, we also show that VHEE plans are similar or superior to VMAT plans with reduced mean OAR dose and increased target conformity for a variety of clinical cases, and VHEE plans can even achieve reductions in OAR doses compared to PPBS plans for shallow targets. With increased VHEE energy, better conformity and even higher

  8. Evaluation of field development plans using 3-D reservoir modelling

    Energy Technology Data Exchange (ETDEWEB)

    Seifert, D.; Lewis, J.J.M. [Heriot-Watt Univ., Edinburgh (United Kingdom); Newbery, J.D.H. [Conoco, UK Ltd., Aberdeen (United Kingdom)] [and others

    1997-08-01

    Three-dimensional reservoir modelling has become an accepted tool in reservoir description and is used for various purposes, such as reservoir performance prediction or integration and visualisation of data. In this case study, a small Northern North Sea turbiditic reservoir was to be developed with a line drive strategy utilising a series of horizontal producer and injector pairs, oriented north-south. This development plan was to be evaluated and the expected outcome of the wells was to be assessed and risked. Detailed analyses of core, well log and analogue data has led to the development of two geological {open_quotes}end member{close_quotes} scenarios. Both scenarios have been stochastically modelled using the Sequential Indicator Simulation method. The resulting equiprobable realisations have been subjected to detailed statistical well placement optimisation techniques. Based upon bivariate statistical evaluation of more than 1000 numerical well trajectories for each of the two scenarios, it was found that the wells inclinations and lengths had a great impact on the wells success, whereas the azimuth was found to have only a minor impact. After integration of the above results, the actual well paths were redesigned to meet external drilling constraints, resulting in substantial reductions in drilling time and costs.

  9. GRTgaz 10-year indicative development plan 2007-2016

    International Nuclear Information System (INIS)

    2007-01-01

    GRTgaz is a European leader in natural gas transmission, a world expert in gas transmission networks and systems, and an operator firmly committed to the energy transition. It owns and operates the gas transmission network throughout most of France and it manages the transmission network in Germany, thereby helping to ensure correct operation of the French and European gas market. It contributes to the energy security of regional supply systems and performs a public service mission to ensure the continuity of consumer supply. In accordance with the French Energy Code, GRTgaz publishes a 10-year development plan for its gas distribution network in France every year. This document is produced in line with European and French energy policies. It identifies the transport infrastructure that will need to be built over the next three years, and presents the main infrastructure that is likely to be developed within the next ten years. It incorporates the supply security obligations that TSOs are required to fulfil. It takes account of interested parties' needs and projects at the national, supranational and European levels. It is based on existing gas supply and demand and reasonable medium-term development forecasts for gas infrastructure, consumption and international trade

  10. Combinations of options: Methodology for impact analysis. Development plan 1993

    International Nuclear Information System (INIS)

    1992-01-01

    The orientations favored by Hydro-Quebec in terms of electricity supply and demand are based on a few key selection criteria. These criteria, as described in its development plan, pertain to economic benefit for the utility and its customers, compatibility with sustainable development, minimization of costs to customers, preservation of the utility's financial health, generation of economic spinoffs, and ease of adaptation. Impacts are calculated to illustrate the selection criteria. The main methods, assumptions, and components used in evaluating the various impacts are described. The discounted overall cost for Hydro-Quebec and all of its customers, means of meeting electricity requirements, and the economic benefit for Hydro-Quebec of the various market development options are discussed. The indicators chosen for environmental impact assessment are set forth and the method used to calculate long-term supply costs is presented, along with the methods for calculating economic spinoffs. Finally, the concepts of energy mix and energy self-sufficiency are outlined. 1 tab

  11. Development of Lesson Plans and Student Worksheets Based Socio-Scientific Issues on Pollution Environmental Topic

    Science.gov (United States)

    Rahayu, S.; Meyliana, M.; Arlingga, A.; Reny, R.; Siahaan, P.; Hernani, H.

    2017-09-01

    The aim of this study is to develop lesson plans and student worksheets based socio-scientific issues on pollution environmental topic for seventh-grade junior high school students. Environmental pollution topic split into several subtopics namely air pollution, water pollution and soil pollution. The composing of lesson plans were developed based on socio-scientific issues with five stages, namely (1) Motivate; (2) Challenge; (3) Collect scientific evidence; (4) Analyse the evidence; (5) Build knowledge and make connections; and (6) Use evidence. While student worksheets contain articles on socio-scientific issues, practice, and there are a few questions to determine students’ reasoning. The method that is used in this research is research and development (R & D method). Development model used in this study is a model of Plomp that consists of four stages, namely: (1) Initial Research; (2) Design; (3) Realization or Construction; (4) Testing, evaluation and revision; (5) Implementation, while the research was limited to the fourth stage. Lesson plans and student worksheets based on socio-scientific issues was validated through an expert validation. The result showed that lesson plans and student worksheets based socio-scientific issues on pollution theme have a very decent and be able to apply in science classroom.

  12. Assessing Ecosystem Service Provision Under Climate Change to Support Conservation and Development Planning in Myanmar

    Science.gov (United States)

    Mandle, Lisa; Wolny, Stacie; Bhagabati, Nirmal; Helsingen, Hanna; Hamel, Perrine; Bartlett, Ryan; Dixon, Adam; Horton, Radley M.; Lesk, Corey; Manley, Danielle; hide

    2017-01-01

    Inclusion of ecosystem services (ES) information into national-scale development and climate adaptation planning has yet to become common practice, despite demand from decision makers. Identifying where ES originate and to whom the benefits flowunder current and future climate conditionsis especially critical in rapidly developing countries, where the risk of ES loss is high. Here, using Myanmar as a case study, we assess where and how ecosystems provide key benefits to the countrys people and infrastructure. We model the supply of and demand for sediment retention, dry-season baseflows, flood risk reduction and coastal storm protection from multiple beneficiaries. We find that locations currently providing the greatest amount of services are likely to remain important under the range of climate conditions considered, demonstrating their importance in planning for climate resilience. Overlap between priority areas for ES provision and biodiversity conservation is higher than expected by chance overall, but the areas important for multiple ES are underrepresented in currently designated protected areas and Key Biodiversity Areas. Our results are contributing to development planning in Myanmar, and our approach could be extended to other contexts where there is demand for national-scale natural capital information to shape development plans and policies

  13. April 25, 2003, FY2003 Progress Summary and FY2002 Program Plan, Statement of Work and Deliverables for Development of High Average Power Diode-Pumped Solid State Lasers,and Complementary Technologies, for Applications in Energy and Defense

    International Nuclear Information System (INIS)

    Meier, W; Bibeau, C

    2005-01-01

    The High Average Power Laser Program (HAPL) is a multi-institutional, synergistic effort to develop inertial fusion energy (IFE). This program is building a physics and technology base to complement the laser-fusion science being pursued by DOE Defense programs in support of Stockpile Stewardship. The primary institutions responsible for overseeing and coordinating the research activities are the Naval Research Laboratory (NRL) and Lawrence Livermore National Laboratory (LLNL). The current LLNL proposal is a companion document to the one submitted by NRL, for which the driver development element is focused on the krypton fluoride excimer laser option. The NRL and LLNL proposals also jointly pursue complementary activities with the associated rep-rated laser technologies relating to target fabrication, target injection, final optics, fusion chamber, target physics, materials and power plant economics. This proposal requests continued funding in FY03 to support LLNL in its program to build a 1 kW, 100 J, diode-pumped, crystalline laser, as well as research into high gain fusion target design, fusion chamber issues, and survivability of the final optic element. These technologies are crucial to the feasibility of inertial fusion energy power plants and also have relevance in rep-rated stewardship experiments. The HAPL Program pursues technologies needed for laser-driven IFE. System level considerations indicate that a rep-rated laser technology will be needed, operating at 5-10 Hz. Since a total energy of ∼2 MJ will ultimately be required to achieve suitable target gain with direct drive targets, the architecture must be scaleable. The Mercury Laser is intended to offer such an architecture. Mercury is a solid state laser that incorporates diodes, crystals and gas cooling technologies

  14. Review on the Significance of Local Plan for Coastal Reclamation Development: The Case of Malacca, Malaysia

    Directory of Open Access Journals (Sweden)

    Ishak Nor Syafa’ah

    2016-01-01

    Full Text Available A Development Plan acts as a planning and controlling instrument that helps to guide in decision making of current and future development. Therefore, in the Malaysian Town and Country Planning Act 1976 (Act 172, the provision of development plan from each level of the planning administration is stated in the Act under Section 6B till Section 16B. In examining the significance of one of the many development plans in Malaysia, i.e. the local plan, this paper therefore, focuses on the provision of a local plan by the Local Planning Authority (LPA of the said area. This paper, thus, aims to evaluate the Central Malacca Local Plan since Malacca is currently experiencing rapid growth in development along the coastal area. The primary data was obtained from interviews with the related planning authorities via face-to-face method. While, secondary data was gathered from related legal documents, policies and guidelines, as well as the existing development plan for the purpose of an in-depth data. Findings revealed incapability of the existing local plan to assist the development control in deciding the planning permission for reclaimed area. The existing local plan shows no zoning for coastal reclamation area because of the rapid growing development and time consuming procedure to amend the local plan according to the Act 172. In addition, the Act 172 and the process in amending the local plan should be more flexible and able to address the current issue efficiently. Finally, the paper concludes with a suggestion for further exploration in order to achieve an operative development process and functioning practice of the local plan.

  15. Shippingport Atomic Power Station Operating Experience, Developments and Future Plans

    International Nuclear Information System (INIS)

    Feinroth, H.; Oldham, G.M.; Stiefel, J.T.

    1963-01-01

    This paper describes and evaluates five years of operation and test of the Shippingport Atomic Power Station and discusses the current technical developments and future plans of the Shippingport programme. This programme is directed towards development of the basic technology of light-water reactors to provide the basis for potential reduction in the costs of nuclear power. The Shippingport reactor plant has operated for over five years and has been found to integrate readily into a utility system either as a base load or peak load unit. Plant component performance has been reliable. There have been no problems in contamination or waste disposal. Access to primary coolant components for maintenance has been good, demonstrating the integrity of fuel elements. Each of the three refuelling operations performed since start-up of Shippingport has required successively less time to accomplish. Recently, the third seed was refuelled in 32 working days, about one quarter the time required for the first refuelling. The formal requirements of personnel training, written administrative procedures, power plant manuals, etc., which have been a vital factor in the successful implementation of the Shippingport programme, are described. The results obtained from the comprehensive test programme carried out at Shippingport are compared with calculations, and good agreement has been obtained. Reactor core performance, plant stability, and response to load changes, fuel element and control rod performance, long-term effects such as corrosion and radiation level build-up, component performance, etc., are discussed in this paper. The principal objective of the current and future programmes of the Shippingport Project in advancing the basic technology of water-cooled reactors is discussed. This programme includes the continued operation of the Shippingport plant, and the development, design, manufacture and test operation of a long-life, highpower density second core - Core 2. At its

  16. The influence of territory planning and social development on strategic decisions in passenger transport development

    Directory of Open Access Journals (Sweden)

    D. Griškevičienė

    2004-10-01

    Full Text Available The main factors of space planning and social development which play an important role in making strategic decisions in passenger transportation have been analysed. A number of strategic aims based on major principles of territory transport planning have been formulated. The investigation made has shown that the operation of public transport is not closely connected with the main carcass of urban territories. This decreases the efficiency of public transport, making it less popular and competitive compared to automobiles. The creation of the strategy of public transport development for the period of its integration into the EU system requires the use of methods taking into account territory planning and social and economic development of the country. The integration of new territories into the existing transportation system, optimization of routes and the increase of transport service quality are aimed to provide higher living standards and better social and economic conditions for the inhabitants. The appropriate tactical decisions in planning the development of modern passenger transport may be made only if the harmonized and well-grounded strategic aims are defined.

  17. Conservation planning under uncertainty in urban development and vegetation dynamics

    Science.gov (United States)

    Carmel, Yohay

    2018-01-01

    Systematic conservation planning is a framework for optimally locating and prioritizing areas for conservation. An often-noted shortcoming of most conservation planning studies is that they do not address future uncertainty. The selection of protected areas that are intended to ensure the long-term persistence of biodiversity is often based on a snapshot of the current situation, ignoring processes such as climate change. Scenarios, in the sense of being accounts of plausible futures, can be utilized to identify conservation area portfolios that are robust to future uncertainty. We compared three approaches for utilizing scenarios in conservation area selection: considering a full set of scenarios (all-scenarios portfolio), assuming the realization of specific scenarios, and a reference strategy based on the current situation (current distributions portfolio). Our objective was to compare the robustness of these approaches in terms of their relative performance across future scenarios. We focused on breeding bird species in Israel’s Mediterranean region. We simulated urban development and vegetation dynamics scenarios 60 years into the future using DINAMICA-EGO, a cellular-automata simulation model. For each scenario, we mapped the target species’ available habitat distribution, identified conservation priority areas using the site-selection software MARXAN, and constructed conservation area portfolios using the three aforementioned strategies. We then assessed portfolio performance based on the number of species for which representation targets were met in each scenario. The all-scenarios portfolio consistently outperformed the other portfolios, and was more robust to ‘errors’ (e.g., when an assumed specific scenario did not occur). On average, the all-scenarios portfolio achieved representation targets for five additional species compared with the current distributions portfolio (approximately 33 versus 28 species). Our findings highlight the importance

  18. Planned and ongoing projects (pop) database: development and results.

    Science.gov (United States)

    Wild, Claudia; Erdös, Judit; Warmuth, Marisa; Hinterreiter, Gerda; Krämer, Peter; Chalon, Patrice

    2014-11-01

    The aim of this study was to present the development, structure and results of a database on planned and ongoing health technology assessment (HTA) projects (POP Database) in Europe. The POP Database (POP DB) was set up in an iterative process from a basic Excel sheet to a multifunctional electronic online database. The functionalities, such as the search terminology, the procedures to fill and update the database, the access rules to enter the database, as well as the maintenance roles, were defined in a multistep participatory feedback loop with EUnetHTA Partners. The POP Database has become an online database that hosts not only the titles and MeSH categorizations, but also some basic information on status and contact details about the listed projects of EUnetHTA Partners. Currently, it stores more than 1,200 planned, ongoing or recently published projects of forty-three EUnetHTA Partners from twenty-four countries. Because the POP Database aims to facilitate collaboration, it also provides a matching system to assist in identifying similar projects. Overall, more than 10 percent of the projects in the database are identical both in terms of pathology (indication or disease) and technology (drug, medical device, intervention). In addition, approximately 30 percent of the projects are similar, meaning that they have at least some overlap in content. Although the POP DB is successful concerning regular updates of most national HTA agencies within EUnetHTA, little is known about its actual effects on collaborations in Europe. Moreover, many non-nationally nominated HTA producing agencies neither have access to the POP DB nor can share their projects.

  19. Developing a Collaborative Planning Framework for Sustainable Transportation

    Directory of Open Access Journals (Sweden)

    Okan Örsan Özener

    2014-01-01

    Full Text Available Currently, as being the highest petroleum consuming sector in the world, transportation significantly contributes to the total greenhouse gas emissions in the world. Road transportation not only is responsible for approximately 20% of the total emissions of carbon dioxide in the EU and in the US but also has a steadily increasing trend in contributing to global warming. Initiatives undertaken by authorities, such as Emission cap and trade in the EU, limit the emissions resulted from the actions of the companies and also give economic incentives to companies to reduce their emissions. However, in logistics systems with multiple entities, it is difficult to assess the responsibilities of the companies both in terms of costs and emissions. In this study, we consider a delivery network with multiple customers served by a single carrier, which executes a delivery plan with the minimum transportation cost, and allocate the resulting costs and the emissions among the customers in a fair manner. We develop allocation mechanisms for both costs and emissions. In order to develop a mechanism that provides further reduction of the emissions, we study a setting where the carrier takes the responsibility of the emissions and reflects the resulting inefficiencies while charging the customers.

  20. The Personal Development Plan Practice Questionnaire: The Development and Validation of an Instrument to Assess the Employee's Perception of Personal Development Plan Practice

    Science.gov (United States)

    Beausaert, Simon; Segers, Mien; Gijselaers, Wim

    2011-01-01

    Confronted with the speed of technological advancements and increasing global competition, organizations have come to realize that their employees' continuous learning drives business success. A popular tool to support and enhance continuous learning is the personal development plan (PDP). Despite its popularity, empirical evidence of the…