WorldWideScience

Sample records for development plan final

  1. Final Report - Development of a Strategic Energy Plan

    Energy Technology Data Exchange (ETDEWEB)

    Maracas, Kate; Hooks, Todd

    2006-11-30

    The Agua Caliente Band of Cahuilla Indians was awarded a grant under the U.S. Department of Energy’s (“DOE”) Tribal Energy Program to develop a comprehensive Tribal energy plan. The grant, awarded under DOE’s First Steps program, supported the development of a strategic energy plan that integrates with the Tribe’s overall planning and economic development goals, and aligns with Tribal cultural, social, political, and spiritual values. The Tribe set out to incorporate its energy plan into (i) a broader economic development strategy developed by investigators at the University of California at Riverside, and (ii) the overarching goals for job-creation and wealth-creation that are held by both the Tribe and the surrounding Coachella Valley. With these wide-ranging objectives in mind, the Tribe and its consultant, Red Mountain Energy Partners, engaged in a phased approach to creating the strategic energy plan. As illustrated in Figure 1 below, the proposed approach involved both “serial” and “parallel” activities. The capacity-building component of this approach occurred throughout the duration of the project period.

  2. 2006 Long Range Development Plan Final Environmental ImpactReport

    Energy Technology Data Exchange (ETDEWEB)

    Philliber, Jeff

    2007-01-22

    This environmental impact report (EIR) has been prepared pursuant to the applicable provisions of the California Environmental Quality Act (CEQA) and its implementing guidelines (CEQA Guidelines), and the Amended University of California Procedures for Implementation of the California Environmental Quality Act (UC CEQA Procedures). The University of California (UC or the University) is the lead agency for this EIR, which examines the overall effects of implementation of the proposed 2006 Long Range Development Plan (LRDP; also referred to herein as the 'project' for purposes of CEQA) for Lawrence Berkeley National Laboratory (LBNL; also referred to as 'Berkeley Lab,' 'the Laboratory,' or 'the Lab' in this document). An LRDP is a land use plan that guides overall development of a site. The Lab serves as a special research campus operated by the University employees, but it is owned and financed by the federal government and as such it is distinct from the UC-owned Berkeley Campus. As a campus operated by the University of California, the Laboratory is required to prepare an EIR for an LRDP when one is prepared or updated pursuant to Public Resources Code Section 21080.09. The adoption of an LRDP does not constitute a commitment to, or final decision to implement, any specific project, construction schedule, or funding priority. Rather, the proposed 2006 LRDP describes an entire development program of approximately 980,000 gross square feet of new research and support space construction and 320,000 gross square feet of demolition of existing facilities, for a total of approximately 660,000 gross square feet of net new occupiable space for the site through 2025. Specific projects will undergo CEQA review at the time proposed to determine what, if any, additional review is necessary prior to approval. As described in Section 1.4.2, below, and in Chapter 3 of this EIR (the Project Description), the size of the project has been

  3. Methodology development to support NPR strategic planning. Final report

    International Nuclear Information System (INIS)

    1996-01-01

    This report covers the work performed in support of the Office of New Production Reactors during the 9 month period from January through September 1990. Because of the rapid pace of program activities during this time period, the emphasis on work performed shifted from the strategic planning emphasis toward supporting initiatives requiring a more immediate consideration and response. Consequently, the work performed has concentrated on researching and helping identify and resolve those issues considered to be of most immediate concern. Even though they are strongly interrelated, they can be separated into two broad categories as follows: The first category encompasses program internal concerns. Included are issues associated with the current demand for accelerating staff growth, satisfying the immediate need for appropriate skill and experience levels, team building efforts necessary to assure the development of an effective operating organization, ability of people and organizations to satisfactorily understand and execute their assigned roles and responsibilities, and the general facilitation of inter/intra organization communications and working relationships. The second category encompasses program execution concerns. These include those efforts required in development of realistic execution plans and implementation of appropriate control mechanisms which provide for effective forecasting, planning, managing, and controlling of on-going (or soon to be) program substantive activities according to the master integrated schedule and budget

  4. Long term planning for wind energy development

    International Nuclear Information System (INIS)

    Trinick, M.

    1995-01-01

    In a planning system intended to be governed primarily by policies in statutory plans a reasonable horizon for long term planning is 10 years or longer. Because of statutory requirements, developers have no option but to pay due regard to, and take a full part in, long term planning. The paper examines the type of policies which have emerged in the last few years to cater for wind energy development. It canvasses the merits of different types of policies. Finally, it discusses the policy framework which may emerge to cater for development outside NFFO. (Author)

  5. PSSD - Planning System for Sustainable Development

    DEFF Research Database (Denmark)

    PSSD - Planning System for Sustainable Development - is a part of the Baltic Sea Region's INTERREG II C program. The current report describes some theories, methods and tools developed under the PSSD project. First, the theoretical foundation of the project is described. Secondly, the role...... of indicators in sustainable development is discussed and a Web-based indicator generator is described. Thirdly, we describe a number of methods and tools, which support planning for sustainable development. Finally, some technical interface tools - especially a Web-based interface to the methods and tools...

  6. Idaho National Engineering Laboratory site development plan

    International Nuclear Information System (INIS)

    1994-09-01

    This plan briefly describes the 20-year outlook for the Idaho National Engineering Laboratory (INEL). Missions, workloads, worker populations, facilities, land, and other resources necessary to fulfill the 20-year site development vision for the INEL are addressed. In addition, the plan examines factors that could enhance or deter new or expanded missions at the INEL. And finally, the plan discusses specific site development issues facing the INEL, possible solutions, resources required to resolve these issues, and the anticipated impacts if these issues remain unresolved

  7. 76 FR 61379 - Final Recovery Plan, Bexar County Karst Invertebrates

    Science.gov (United States)

    2011-10-04

    ...] Final Recovery Plan, Bexar County Karst Invertebrates AGENCY: Fish and Wildlife Service, Interior... availability of our final recovery plan, for the nine Bexar County Karst Invertebrates under the Endangered... County karst invertebrates were listed as endangered species on December 26, 2000 (65 FR 81419): Rhadine...

  8. N Area Final Project Program Plan

    International Nuclear Information System (INIS)

    Day, R.S.; Duncan, G.M; Trent, S.J.

    1998-07-01

    The N Area Final Project Program Plan is issued for information and use by the U.S. Department of Energy (DOE), the Environmental Restoration Contractor (ERC) for the Hanford Site, and other parties that require workscope knowledge for the deactivation of N Reactor facilities and remediation of the 100-N Area. This revision to the program plan contains the updated critical path schedule to deactivate N Reactor and its supporting facilities, cleanout of the N Reactor Fuel Storage Basin (105-N Basin), and remediate the 100-N Area. This document reflects notable changes in the deactivation plan for N Reactor, including changes in deactivation status, the N Basin cleanout task, and 100-N Area remediation

  9. Claims Procedure for Plans Providing Disability Benefits. Final rule.

    Science.gov (United States)

    2016-12-19

    This document contains a final regulation revising the claims procedure regulations under the Employee Retirement Income Security Act of 1974 (ERISA) for employee benefit plans providing disability benefits. The final rule revises and strengthens the current rules primarily by adopting certain procedural protections and safeguards for disability benefit claims that are currently applicable to claims for group health benefits pursuant to the Affordable Care Act. This rule affects plan administrators and participants and beneficiaries of plans providing disability benefits, and others who assist in the provision of these benefits, such as third-party benefits administrators and other service providers.

  10. Final Hanford Comprehensive Land-Use Plan Environmental Impact Statement, Hanford Site, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    1999-10-01

    This Final ''Hanford Comprehensive Land-Use Plan Environmental Impact Statement'' (HCP EIS) is being used by the Department of Energy (DOE) and its nine cooperating and consulting agencies to develop a comprehensive land-use plan (CLUP) for the Hanford Site. The DOE will use the Final HCP EIS as a basis for a Record of Decision (ROD) on a CLUP for the Hanford Site. While development of the CLUP will be complete with release of the HCP EIS ROD, full implementation of the CLUP is expected to take at least 50 years. Implementation of the CLUP would begin a more detailed planning process for land-use and facility-use decisions at the Hanford Site. The DOE would use the CLUP to screen proposals. Eventually, management of Hanford Site areas would move toward the CLUP land-use goals. This CLUP process could take more than 50 years to fully achieve the land-use goals.

  11. Technical planning activity: Final report

    Energy Technology Data Exchange (ETDEWEB)

    1987-01-01

    In April 1985, the US Department of Energy's (DOE's) Office of Fusion Energy commissioned the Technical Planning Activity (TPA). The purpose of this activity was to develop a technical planning methodology and prepare technical plans in support of the strategic and policy framework of the Magnetic Fusion Program Plan issued by DOE in February 1985. Although this report represents the views of only the US magnetic fusion community, it is international in scope in the sense that the technical plans contained herein describe the full scope of the tasks that are prerequisites for the commercialization of fusion energy. The TPA has developed a well-structured methodology that includes detailed definitions of technical issues, definitions of program areas and elements, statements of research and development objectives, identification of key decision points and milestones, and descriptions of facility requirements.

  12. Technical planning activity: Final report

    International Nuclear Information System (INIS)

    1987-01-01

    In April 1985, the US Department of Energy's (DOE's) Office of Fusion Energy commissioned the Technical Planning Activity (TPA). The purpose of this activity was to develop a technical planning methodology and prepare technical plans in support of the strategic and policy framework of the Magnetic Fusion Program Plan issued by DOE in February 1985. Although this report represents the views of only the US magnetic fusion community, it is international in scope in the sense that the technical plans contained herein describe the full scope of the tasks that are prerequisites for the commercialization of fusion energy. The TPA has developed a well-structured methodology that includes detailed definitions of technical issues, definitions of program areas and elements, statements of research and development objectives, identification of key decision points and milestones, and descriptions of facility requirements

  13. Tax treatment of cafeteria plans. Internal Revenue Service (IRS), Treasury. Final regulations.

    Science.gov (United States)

    2000-03-23

    This document contains final regulations relating to section 125 cafeteria plans. The final regulations clarify the circumstances under which a section 125 cafeteria plan election may be changed. The final regulations permit an employer to allow a section 125 cafeteria plan participant to revoke an existing election and make a new election during a period of coverage for accident or health coverage or group-term life insurance coverage.

  14. 76 FR 17808 - Final Vehicle Safety Rulemaking and Research Priority Plan 2011-2013

    Science.gov (United States)

    2011-03-31

    ... [Docket No. NHTSA-2009-0108] Final Vehicle Safety Rulemaking and Research Priority Plan 2011- 2013 AGENCY... availability. SUMMARY: This document announces the availability of the Final NHTSA Vehicle Safety and Fuel.... This Priority Plan is an update to the Final Vehicle Safety Rulemaking and Research Priority Plan 2009...

  15. Planning developments in British Nuclear Fuels Ltd

    Energy Technology Data Exchange (ETDEWEB)

    Roper, D A [British Nuclear Fuels Ltd., Risley

    1978-10-01

    The state of the corporate planning art in British Nuclear Fuels Ltd. was described by N.R.Geary (Long Range Planning, September (1973)) just 2 years after Company formation. This article discusses more recent planning developments over the period to date during which the Company adopted a Divisionalized structure (from October 1974) and has been required to submit an annual Company plan to the Department of Energy (from November 1975). Background information on the origin and nature of the BNFL and its business, and the particular features of the Company which reflect into the nature and method of its planning were given in the 1973 article and only a brief introductory updating of the Company position is included here. Subsequently the features and problems of BNFL's operating and development planning system are described. Finally, messages arising from BNFL's planning experience to date which may be of general application and therefore of value to other practitioners of planning are listed.

  16. EMI Architecture and Technology Development Plan

    CERN Document Server

    Balazs, K.

    2013-01-01

    This document provides a brief overview of the EMI architecture and the technology development directions presented by the four EMI technology areas and by EMI partners. The report represents the final revision of EMI technology planning covering a time period beyond the project end.

  17. Final Action Plan to Tiger Team

    International Nuclear Information System (INIS)

    1992-01-01

    This document presents planned actions, and their associated costs, for addressing the findings in the Environmental, Safety and Health Tiger Team Assessment of the Sandia National Laboratories, Albuquerque, May 1991, hereafter called the Assessment. This Final Action Plan should be read in conjunction with the Assessment to ensure full understanding of the findings addressed herein. The Assessment presented 353 findings in four general categories: (1)Environmental (82 findings); (2) Safety and Health (243 findings); (3) Management and Organization (18 findings); and (4) Self-Assessment (10 findings). Additionally, 436 noncompliance items with Occupational Safety and Health Administration (OSHA) standards were addressed during and immediately after the Tiger Team visit

  18. Tracking the Short Term Planning (STP) Development Process

    Science.gov (United States)

    Price, Melanie; Moore, Alexander

    2010-01-01

    Part of the National Aeronautics and Space Administration?s mission is to pioneer the future in space exploration, scientific discovery and aeronautics research is enhanced by discovering new scientific tools to improve life on earth. Sequentially, to successfully explore the unknown, there has to be a planning process that organizes certain events in the right priority. Therefore, the planning support team has to continually improve their processes so the ISS Mission Operations can operate smoothly and effectively. The planning support team consists of people in the Long Range Planning area that develop timelines that includes International Partner?s Preliminary STP inputs all the way through to publishing of the Final STP. Planning is a crucial part of the NASA community when it comes to planning the astronaut?s daily schedule in great detail. The STP Process is in need of improvement, because of the various tasks that are required to be broken down in order to get the overall objective of developing a Final STP done correctly. Then a new project came along in order to store various data in a more efficient database. "The SharePoint site is a Web site that provides a central storage and collaboration space for documents, information, and ideas."

  19. Plan for advanced microelectronics processing technology application. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Goland, A.N.

    1990-10-01

    The ultimate objective of the tasks described in the research agreement was to identify resources primarily, but not exclusively, within New York State that are available for the development of a Center for Advanced Microelectronics Processing (CAMP). Identification of those resources would enable Brookhaven National Laboratory to prepare a program plan for the CAMP. In order to achieve the stated goal, the principal investigators undertook to meet the key personnel in relevant NYS industrial and academic organizations to discuss the potential for economic development that could accompany such a Center and to gauge the extent of participation that could be expected from each interested party. Integrated of these discussions was to be achieved through a workshop convened in the summer of 1990. The culmination of this workshop was to be a report (the final report) outlining a plan for implementing a Center in the state. As events unfolded, it became possible to identify the elements of a major center for x-ray lithography on Lone Island at Brookhaven National Laboratory. The principal investigators were than advised to substitute a working document based upon that concept in place of a report based upon the more general CAMP workshop originally envisioned. Following that suggestion from the New York State Science and Technology Foundation, the principals established a working group consisting of representatives of the Grumman Corporation, Columbia University, the State University of New York at Stony Brook, and Brookhaven National Laboratory. Regular meetings and additional communications between these collaborators have produced a preproposal that constitutes the main body of the final report required by the contract. Other components of this final report include the interim report and a brief description of the activities which followed the establishment of the X-ray Lithography Center working group.

  20. Project No. 8 - Final decommissioning plan

    International Nuclear Information System (INIS)

    2000-01-01

    Ignalina NPP should prepare the final Ignalina NPP unit 1 decommissioning plan by march 31, 2002. This plan should include the following : description of Ignalina NPP and the Ignalina NPP boundary that could be influenced by decommissioning process; decommissioning strategy selected and a logical substantiation for this selection; description of the decommissioning actions suggested and a time schedule for the actions to be performed; conceptual safety and environmental impact assessment covering ionizing radiation and other man and environment impact; description of the environmental monitoring program proposed during decommissioning process; description of the waste management proposed; assessment of decommissioning expenses including waste management, accumulated funds and other sources. Estimated project cost - 0.75 M EURO

  1. 75 FR 71730 - General Management Plan/Wilderness Study/Off-Road Vehicle Management Plan, Final Environmental...

    Science.gov (United States)

    2010-11-24

    ... management under alternative B would be to enable visitor participation in a wide variety of outdoor... DEPARTMENT OF THE INTERIOR National Park Service [2031-A046-409] General Management Plan/Wilderness Study/Off-Road Vehicle Management Plan, Final Environmental Impact Statement, Big Cypress National...

  2. High Burnup Dry Storage Cask Research and Development Project, Final Test Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2014-02-27

    EPRI is leading a project team to develop and implement the first five years of a Test Plan to collect data from a SNF dry storage system containing high burnup fuel.12 The Test Plan defined in this document outlines the data to be collected, and the storage system design, procedures, and licensing necessary to implement the Test Plan.13 The main goals of the proposed test are to provide confirmatory data14 for models, future SNF dry storage cask design, and to support license renewals and new licenses for ISFSIs. To provide data that is most relevant to high burnup fuel in dry storage, the design of the test storage system must mimic real conditions that high burnup SNF experiences during all stages of dry storage: loading, cask drying, inert gas backfilling, and transfer to the ISFSI for multi-year storage.15 Along with other optional modeling, SETs, and SSTs, the data collected in this Test Plan can be used to evaluate the integrity of dry storage systems and the high burnup fuel contained therein over many decades. It should be noted that the Test Plan described in this document discusses essential activities that go beyond the first five years of Test Plan implementation.16 The first five years of the Test Plan include activities up through loading the cask, initiating the data collection, and beginning the long-term storage period at the ISFSI. The Test Plan encompasses the overall project that includes activities that may not be completed until 15 or more years from now, including continued data collection, shipment of the Research Project Cask to a Fuel Examination Facility, opening the cask at the Fuel Examination Facility, and examining the high burnup fuel after the initial storage period.

  3. Community development planning

    International Nuclear Information System (INIS)

    Gray, S.I.

    1983-01-01

    The focus of this paper will be methods of local community involvement in the community development planning efforts which will be required at the recommended sites. Community development planning will include capital improvement plans, housing plans, zoning changes, business development plans and other community service and fiscal plans required to meet the projected needs of new residents as a result of the repository construction and operation. This paper will present, (1) the need for community planning, (2) methods of responding to community planning needs, (3) current community planning issues to be addressed. 2 references, 1 figure

  4. PFP requirements development planning guide

    International Nuclear Information System (INIS)

    SINCLAIR, J.C.

    1999-01-01

    The PFP Requirements Development Planning Guide presents the strategy and process used for the identification, allocation, and maintenance of requirements within the Plutonium Finishing Plant (PFP) integrated project baseline. Future revisions to this document will be included as attachments (e.g., results of the PFP Requirements Analysis attributable to this approach). This document is intended be a Project-owned management tool. As such, this document will periodically require revisions resulting from improvements of the information, processes, and techniques as now described. Future updates may be made to this document by PFP management and final approval of the content will be accomplished in a Baseline Change Request as it impacts the Multi-Year Work Plan, or baseline information managed in the Hanford Site Systems Engineering Baseline

  5. Development of an arid site closure plan

    International Nuclear Information System (INIS)

    Nyhan, J.W.; Barnes, F.J.

    1987-01-01

    This document describes the development of a prototype plan for the effective closure and stabilization of an arid low-level waste disposal site. This plan will provide demonstrated closure techniques for a trench in a disposal site at Los Alamos. The accuracy of modeling soil water storage by two hydrologic models, CREAMS and HELP, was tested by comparing simulation results with field measurements of soil moisture in eight experimental landfill cover systems having a range of well-defined soil profiles and vegetative covers. Regression analysis showed that CREAMS generally represented soil moisture more accurately than HELP simulations. Precautions for determining parameter values for model input and for interpreting simulation results are discussed. A specific example is presented showing how the field-validated hydrologic models can be used to develop a final prototype closure plan. 15 refs., 13 figs., 3 tabs

  6. Development of advanced methods for planning electric energy distribution systems. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Goenen, T.; Foote, B.L.; Thompson, J.C.; Fagan, J.E.

    1979-10-01

    An extensive search was made for the identification and collection of reports published in the open literature which describes distribution planning methods and techniques. In addition, a questionnaire has been prepared and sent to a large number of electric power utility companies. A large number of these companies were visited and/or their distribution planners interviewed for the identification and description of distribution system planning methods and techniques used by these electric power utility companies and other commercial entities. Distribution systems planning models were reviewed and a set of new mixed-integer programming models were developed for the optimal expansion of the distribution systems. The models help the planner to select: (1) optimum substation locations; (2) optimum substation expansions; (3) optimum substation transformer sizes; (4) optimum load transfers between substations; (5) optimum feeder routes and sizes subject to a set of specified constraints. The models permit following existing right-of-ways and avoid areas where feeders and substations cannot be constructed. The results of computer runs were analyzed for adequacy in serving projected loads within regulation limits for both normal and emergency operation.

  7. 76 FR 68503 - Winter Use Plan, Final Environmental Impact Statement, Yellowstone National Park, Idaho, Montana...

    Science.gov (United States)

    2011-11-04

    ... DEPARTMENT OF THE INTERIOR National Park Service Winter Use Plan, Final Environmental Impact.... ACTION: Notice of availability of the Final Environmental Impact Statement for the Winter Use Plan... Winter Use Plan for Yellowstone National Park, located in Idaho, Montana, and [[Page 68504

  8. Mathematic model of regional economy development by the final result of labor resources

    Science.gov (United States)

    Zaitseva, Irina; Malafeev, Oleg; Strekopytov, Sergei; Bondarenko, Galina; Lovyannikov, Denis

    2018-04-01

    This article presents the mathematic model of regional economy development based on the result of labor resources. The solution of a region development-planning problem is considered for the period of long-lasting planning taking into account the beginning and the end of the planned period. The challenge is to find the distribution of investments in the main and additional branches of the regional economy, which will provide simultaneous transaction of all major sectors of the regional economy from the given condition to the predetermined final state.

  9. Program Development Plan and Team up; FINAL

    International Nuclear Information System (INIS)

    Solar Electric Power Association

    2001-01-01

    The final summary report is a comprehensive view of TEAM-UP, with documented data, information, and experiences that SEPA has collected throughout the program, including lessons learned by participating ventures, and sections covering costs and other information on both large and small systems. This report also covers the barriers that TEAM-UP faced to PV commercialization at the beginning of the program, barriers the project was able to remove or reduce, and what barriers remain on the road ahead

  10. 77 FR 16558 - General Management Plan/Final Environmental Impact Statement, Hampton National Historic Site...

    Science.gov (United States)

    2012-03-21

    ... Management Plan/Final Environmental Impact Statement, Hampton National Historic Site, Maryland AGENCY...) announces the availability of the Final Environmental Impact Statement for the General Management Plan.../Baltimore County Library, 320 York Avenue, Towson, Maryland 21204. Baltimore County Tourism Office and...

  11. 77 FR 74027 - Winter Use Plan, Final Environmental Impact Statement Amended Record of Decision, Yellowstone...

    Science.gov (United States)

    2012-12-12

    ...] Winter Use Plan, Final Environmental Impact Statement Amended Record of Decision, Yellowstone National... Availability of Amended Record of Decision for the Final Environmental Impact Statement for a Winter Use Plan... Record of Decision for the Winter Use Plan for Yellowstone National Park, located in Idaho, Montana, and...

  12. Federal Employees Health Benefits Program: Enrollment Options Following the Termination of a Plan or Plan Option. Final rule.

    Science.gov (United States)

    2015-10-28

    The U.S. Office of Personnel Management (OPM) is issuing a final rule to amend the Federal Employees Health Benefits (FEHB) Program regulations regarding enrollment options following the termination of a plan or plan option.

  13. Hanford Site Development Plan

    International Nuclear Information System (INIS)

    Rinne, C.A.; Curry, R.H.; Hagan, J.W.; Seiler, S.W.; Sommer, D.J.; Yancey, E.F.

    1990-01-01

    The Hanford Site Development Plan (Site Development Plan) is intended to guide the short- and long-range development and use of the Hanford Site. All acquisition, development, and permanent facility use at the Hanford Site will conform to the approved plan. The Site Development Plan also serves as the base document for all subsequent studies that involve use of facilities at the Site. This revision is an update of a previous plan. The executive summary presents the highlights of the five major topics covered in the Site Development Plan: general site information, existing conditions, planning analysis, Master Plan, and Five-Year Plan. 56 refs., 67 figs., 31 tabs

  14. Hanford Site Development Plan

    Energy Technology Data Exchange (ETDEWEB)

    Rinne, C.A.; Curry, R.H.; Hagan, J.W.; Seiler, S.W.; Sommer, D.J. (Westinghouse Hanford Co., Richland, WA (USA)); Yancey, E.F. (Pacific Northwest Lab., Richland, WA (USA))

    1990-01-01

    The Hanford Site Development Plan (Site Development Plan) is intended to guide the short- and long-range development and use of the Hanford Site. All acquisition, development, and permanent facility use at the Hanford Site will conform to the approved plan. The Site Development Plan also serves as the base document for all subsequent studies that involve use of facilities at the Site. This revision is an update of a previous plan. The executive summary presents the highlights of the five major topics covered in the Site Development Plan: general site information, existing conditions, planning analysis, Master Plan, and Five-Year Plan. 56 refs., 67 figs., 31 tabs.

  15. FOCUS: a fire management planning system -- final report

    Science.gov (United States)

    Frederick W. Bratten; James B. Davis; George T. Flatman; Jerold W. Keith; Stanley R. Rapp; Theodore G. Storey

    1981-01-01

    FOCUS (Fire Operational Characteristics Using Simulation) is a computer simulation model for evaluating alternative fire management plans. This final report provides a broad overview of the FOCUS system, describes two major modules-fire suppression and cost, explains the role in the system of gaming large fires, and outlines the support programs and ways of...

  16. Plan for gas overcrowding; Development in last decade

    International Nuclear Information System (INIS)

    Unidad de Planeacion Minero Energetica, UPME

    2000-01-01

    The plan for gas overcrowding, is one of the most important determinations of energy politics in last decade. It is an integral plan of consumption of combustible gas; that is to say, cover the natural gas and the liquefied gas of petroleum. In this article, the UPME wants to show the results of the implementation of this measure. The analysis shows, in the first place the impact achieved in the diversification of the energetic basket, with the penetration of the combustible gas. Facts and indicators of development of the plan are given that include an evaluation of the direct financial benefit that receive the homes, when using a more economic fuel. On the other hand, it puts on of present the government effort carried out through ECOPETROL and that of some private agents to start the plan. Finally, the investments made until today and the problems of low use of some nets of transport, related with the development of the market

  17. Portable linear accelerator development. Final report

    International Nuclear Information System (INIS)

    Schonberg, R.G.

    1983-01-01

    The final report on Project RP 822-6 describes the MINAC 3 development from the recognition of need for a lightweight, portable high-energy device to the successful completion and field use of the MINAC. MINAC, which represents a substantial improvement in field radiographic capability and in technology, rapidly transitioned from proof-of-principle (1978 to 1980) to field-proven product (1980 to 1981). As a result, the decision has been made to develop this report as a users guide as well as a historic record of design, development, and testing program. The first section of this report has the following principal objectives: to describe the existing MINAC equipment capabilities and achievable modifications; to provide applications information for prospective users; and to provide technical information on high-energy radiography useful for familiarization and planning. The users guide section is followed by sections which describe the design basis, development, and application history of MINAC through the course of EPRI RP822 research projects 1 to 5, inclusively

  18. Career planning and development for nurses: the time has come.

    Science.gov (United States)

    Donner, G J; Wheeler, M M

    2001-06-01

    Developments in how the nursing profession is perceived by nurses and by society, along with unparalleled changes in health care systems, have created an environment in which individual nurses must take control of their careers and futures. Educators, employers and professional organizations also have a key role to play in fostering the career planning and development of nurses, usually the largest employee group in most health care organizations. This article provides an overview of what career planning and development is and why it is important for nurses. A career planning and development model is described that provides nurses with a focused strategy to take greater responsibility for engaging in the ongoing planning process that is crucial throughout the major stages of their career. Finally, educators, employers and professional organizations are challenged to collaborate with individual nurses on career-development activities that will enable nurses to continue to provide high-quality care in ever-changing health care systems.

  19. Hawaii State Plan for Occupational Safety and Health. Final rule.

    Science.gov (United States)

    2012-09-21

    This document announces the Occupational Safety and Health Administration's (OSHA) decision to modify the Hawaii State Plan's ``final approval'' determination under Section 18(e) of the Occupational Safety and Health Act (the Act) and to transition to ``initial approval'' status. OSHA is reinstating concurrent federal enforcement authority over occupational safety and health issues in the private sector, which have been solely covered by the Hawaii State Plan since 1984.

  20. Liquid effluent retention facility final-status groundwater monitoring plan

    International Nuclear Information System (INIS)

    Sweeney, M.D.; Chou, C.J.; Bjornstad, B.N.

    1997-09-01

    The following sections describe the groundwater-monitoring program for the Liquid Effluent Retention Facility (LERF). The LERF is regulated under the Resource Conservation and Recovery Act of 1976 (RCRA). The LERF is included in the open-quotes Dangerous Waste Portion of the Resource Conservation and Recovery Act Permit for the Treatment, Storage, and Disposal of Dangerous Waste, Permit WA890008967close quotes, (referred to herein as the Permit) (Ecology 1994) and is subject to final-status requirements for groundwater monitoring (WAC 173-303-645). This document describes a RCRA/WAC groundwater detection-monitoring program for groundwater in the uppermost aquifer system at the LERF. This plan describes the LERF monitoring network, constituent list, sampling schedule, statistical methods, and sampling and analysis protocols that will be employed for the LERF. This plan will be used to meet the groundwater monitoring requirements from the time the LERF becomes part of the Permit and through the post-closure care period, until certification of final closure

  1. 76 FR 24050 - Coral Reef Restoration Plan, Final Programmatic Environmental Impact Statement, Biscayne National...

    Science.gov (United States)

    2011-04-29

    ... DEPARTMENT OF THE INTERIOR National Park Service [2310-0003-422] Coral Reef Restoration Plan... for the Coral Reef Restoration Plan, Biscayne National Park. SUMMARY: Pursuant to the National... availability of a Final Programmatic Environmental Impact Statement for the Coral Reef Restoration Plan (Plan...

  2. Space Assembly, Maintenance and Servicing Study. Volume 4: Concept Development Plan

    National Research Council Canada - National Science Library

    1986-01-01

    .... This concept development program (CDP), Volume IV of the SAMS final report, contains a summary of the selection of CDP candidates and a plan for completing the required analysis, tests and demonstrations...

  3. MnDOT Library strategic plan : final report.

    Science.gov (United States)

    2017-06-01

    MnDOTs Senior Leadership asked MnDOT Library to develop a Strategic Plan that identifies and reviews the challenges facing the Library over the next five years to better address the evolving needs of the department and users. The strategic plan is...

  4. Hanford 300 Area Development Plan

    International Nuclear Information System (INIS)

    Daly, K.S.; Seiler, S.W.; Hail, J.C.

    1991-09-01

    The purpose of the Hanford 300 Area Development Plan (Development Plan) is to guide the physical development of the 300 Area in accordance with US Department of Energy (DOE) Order 4320.1B (DOE 1991b) by performing the following: (1) Establishing a land use plan, setting land use categories that meet the needs of existing and proposed activities; (2) Coordinating existing, 5-yr, and long-range development plans and guiding growth in accordance with those plans; (3) Establishing development guidelines to encourage cost-effective development and minimize conflicts between adjacent activities; (4) Identifying site development issues that need further analysis; Integrating program plans with development plans to ensure a logical progression of development; and, (6) Integrating DOE plans with local agency plans (i.e., city, country, state, and Tri-Cities Science and Technology Park plans)

  5. Prioritization of tasks in the draft LWR safety technology program plan. Final report

    International Nuclear Information System (INIS)

    Lim, E.Y.; Miller, W.J.; Parkinson, W.J.; Ritzman, R.L.; vonHerrmann, J.L.; Wood, P.J.

    1980-05-01

    The purpose of this report is to describe both the approach taken and the results produced in the SAI effort to prioritize the tasks in the Sandia draft LWR Safety Technology Program Plan. This work used the description of important safety issues developed in the Reactor Safety Study (2) to quantify the effect of safety improvements resulting from a research and development program on the risk from nuclear power plants. Costs of implementation of these safety improvements were also estimated to allow a presentation of the final results in a value (i.e., risk reduction) vs. impact (i.e., implementation costs) matrix

  6. Emergency evacuation/transportation plan update: Traffic model development and evaluation of early closure procedures. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-10-28

    Prolonged delays in traffic experienced by Laboratory personnel during a recent early dismissal in inclement weather, coupled with reconstruction efforts along NM 502 east of the White Rock Wye for the next 1 to 2 years, has prompted Los Alamos National Laboratory (LANL) to re-evaluate and improve the present transportation plan and its integration with contingency plans maintained in other organizations. Facilities planners and emergency operations staff need to evaluate the transportation system`s capability to inefficiently and safely evacuate LANL under different low-level emergency conditions. A variety of potential procedures governing the release of employees from the different technical areas (TAs) requires evaluation, perhaps with regard to multiple emergency-condition scenarios, with one or more optimal procedures ultimately presented for adoption by Lab Management. The work undertaken in this project will hopefully lay a foundation for an on-going, progressive transportation system analysis capability. It utilizes microscale simulation techniques to affirm, reassess and validate the Laboratory`s Early Dismissal/Closure/Delayed Opening Plan. The Laboratory is required by Federal guidelines, and compelled by prudent practice and conscientious regard for the welfare of employees and nearby residents, to maintain plans and operating procedures for evacuation if the need arises. The tools developed during this process can be used outside of contingency planning. It is anticipated that the traffic models developed will allow site planners to evaluate changes to the traffic network which could better serve the normal traffic levels. Changes in roadway configuration, control strategies (signalization and signing), response strategies to traffic accidents, and patterns of demand can be modelled using the analysis tools developed during this project. Such scenarios typically are important considerations in master planning and facilities programming.

  7. Development of a central final repository management for the coordination of the waste for Schacht Konrad from public authorities

    International Nuclear Information System (INIS)

    Graffunder, Iris; Dominke-Bendix, Carola; Waldek, Achim

    2012-01-01

    The central final repository management is supposed to fulfill the following tasks: active collaboration of Konrad contract draft, signing of internal contracts and agreements, cooperation contract with GNS, cooperation with coordination authorities, inventory taking of wastes (existing inventory and prognosis) and interim storage capacities of public authorities, development of planning and management software, optimization of the final repository documentation, container management, logistics concept, long-term disposal planning and prognosis, planning and coordination of the annual waste amount, management and documentation of disposed waste allocation, coordination of transport schedules, consulting service for waste obligations (final repository requirements, product control, documentation).

  8. 76 FR 75556 - Notice of Availability of the Proposed Resource Management Plan and Final Environmental Impact...

    Science.gov (United States)

    2011-12-02

    ...] Notice of Availability of the Proposed Resource Management Plan and Final Environmental Impact Statement for the Taos Field Office, New Mexico AGENCY: Bureau of Land Management, Interior. ACTION: Notice of...) has prepared the Proposed Resource Management Plan/Final Environmental Impact Statement (Proposed RMP...

  9. 77 FR 23747 - Notice of Availability of the Proposed John Day Basin Resource Management Plan and Final...

    Science.gov (United States)

    2012-04-20

    ... Management Plan (RMP)/Final Environmental Impact Statement (EIS) for the John Day Basin planning area and by... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLORP0000.16100000.DQ0000 LXSS053H0000 HAG10-0234] Notice of Availability of the Proposed John Day Basin Resource Management Plan and Final...

  10. Development of planning methods for demand-side management (DSM)

    International Nuclear Information System (INIS)

    Kaerkkaeinen, S.; Kekkonen, V.; Rissanen, P.

    1995-01-01

    The interest of utilities and governmental agencies in Demand-side management (IDSM) and Integrated Resource Planning (IRP) has increased during recent years also in Finland. From the governmental point of view, the main reason for this has been concern about the environmental effects of electricity supply and consumption. Utilities are mainly interested in cost reductions in electricity supply and distribution caused by DSM. Also improved service to the customer due to DSM has increasing value to utilities. In this project, the main target has been to develop and assess methods for DSM planning from the utility point of view. The final goal is to integrate these methods into the strategic planning of electric utilities

  11. Project Execution Plan,Rev. 3; FINAL

    International Nuclear Information System (INIS)

    IT Corporation, Las Vegas

    2002-01-01

    This plan addresses project activities encompassed by the U.S. Department of Energy's (DOE's), National Nuclear Security Administration Nevada Operations Office, Environmental Restoration Division and conforms to the requirements contained in the Life-Cycle Asset Management, DOE Order 430.1A; The Joint Program Office Policy on Project Management in Support of DOE Order 430.1; Program and Project Management for the Acquisition of Capital Assets, DOE Order 413.3; the Project Execution and Engineering Management Planning Guide, GPG-FM-010; and other applicable Good Practice Guides; and the FY 2001 Integrated Planning, Accountability, and Budgeting System Policy Guidance. The plan also reflects the milestone philosophies of the Federal Facility Agreement and Consent Order, as agreed to by the State of Nevada, the DOE, and the U.S. Department of Defense; and traditional project management philosophies such as the development of life-cycle costs, schedules, and work scope; identification o f roles and responsibilities; and baseline management and controls

  12. Hanford 200 Areas Development Plan

    Energy Technology Data Exchange (ETDEWEB)

    Rinne, C.A.; Daly, K.S.

    1993-08-01

    The purpose of the Hanford 200 Areas Development Plan (Development Plan) is to guide the physical development of the 200 Areas (which refers to the 200 East Area, 200 West Area, and 200 Area Corridor, located between the 200 East and 200 West Areas) in accordance with US Department of Energy (DOE) Order 4320.lB (DOE 1991a) by performing the following: Establishing a land-use plan and setting land-use categories that meet the needs of existing and proposed activities. Coordinating existing, 5-year, and long-range development plans and guiding growth in accordance with those plans. Establishing development guidelines to encourage cost-effective development and minimize conflicts between adjacent activities. Identifying site development issues that need further analysis. Integrating program plans with development plans to ensure a logical progression of development. Coordinate DOE plans with other agencies [(i.e., Washington State Department of Ecology (Ecology) and US Environmental Protection Agency (EPA)]. Being a support document to the Hanford Site Development Plan (DOE-RL 1990a) (parent document) and providing technical site information relative to the 200 Areas.

  13. Hanford 200 Areas Development Plan

    International Nuclear Information System (INIS)

    Rinne, C.A.; Daly, K.S.

    1993-08-01

    The purpose of the Hanford 200 Areas Development Plan (Development Plan) is to guide the physical development of the 200 Areas (which refers to the 200 East Area, 200 West Area, and 200 Area Corridor, located between the 200 East and 200 West Areas) in accordance with US Department of Energy (DOE) Order 4320.lB (DOE 1991a) by performing the following: Establishing a land-use plan and setting land-use categories that meet the needs of existing and proposed activities. Coordinating existing, 5-year, and long-range development plans and guiding growth in accordance with those plans. Establishing development guidelines to encourage cost-effective development and minimize conflicts between adjacent activities. Identifying site development issues that need further analysis. Integrating program plans with development plans to ensure a logical progression of development. Coordinate DOE plans with other agencies [(i.e., Washington State Department of Ecology (Ecology) and US Environmental Protection Agency (EPA)]. Being a support document to the Hanford Site Development Plan (DOE-RL 1990a) (parent document) and providing technical site information relative to the 200 Areas

  14. Wind-energy Science, Technology and Research (WindSTAR) Consortium: Curriculum, Workforce Development, and Education Plan Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Manwell, James [Univ. of Massachusetts, Amherst, MA (United States)

    2013-03-19

    The purpose of the project is to modify and expand the current wind energy curriculum at the University of Massachusetts Amherst and to develop plans to expand the graduate program to a national scale. The expansion plans include the foundational steps to establish the American Academy of Wind Energy (AAWE). The AAWE is intended to be a cooperative organization of wind energy research, development, and deployment institutes and universities across North America, whose mission will be to develop and execute joint RD&D projects and to organize high-level science and education in wind energy

  15. Hanford Site Development Plan

    International Nuclear Information System (INIS)

    Hathaway, H.B.; Daly, K.S.; Rinne, C.A.; Seiler, S.W.

    1993-05-01

    The Hanford Site Development Plan (HSDP) provides an overview of land use, infrastructure, and facility requirements to support US Department of Energy (DOE) programs at the Hanford Site. The HSDP's primary purpose is to inform senior managers and interested parties of development activities and issues that require a commitment of resources to support the Hanford Site. The HSDP provides an existing and future land use plan for the Hanford Site. The HSDP is updated annually in accordance with DOE Order 4320.1B, Site Development Planning, to reflect the mission and overall site development process. Further details about Hanford Site development are defined in individual area development plans

  16. Development of whole-building energy design targets for commercial buildings: Phase 1, Planning: Volume 1, Final report

    Energy Technology Data Exchange (ETDEWEB)

    Crawley, D.B.; Briggs, R.S.; Jones, J.W.; Seaton, W.W.; Kaufman, J.E.; Deringer, J.J.; Kennett, E.W.

    1987-04-01

    This report describes background research for preparation of a plan for development of whole-building energy targets for new commercial buildings. The lead laboratory for this program is the Pacific Northwest Laboratory. A wide variety of expertise and resources from industry, academia, other government entities, and other DOE laboratories are used in planning, reviewing and conducting research activities. Cooperative and complementary research development, and technology transfer activities with other interested organizations are actively pursued.

  17. Manpower development - planning and implementation

    International Nuclear Information System (INIS)

    Scholten, V.W.

    1978-01-01

    The demands of a nuclear technology programme on the manpower resources of a developing country are very onerous. Unlike other industries, as well as the planning and operating staff, nuclear technology requires an additional administrative infrastructure to regulate the various activities. To minimize the effect of manpower shortage, the planning and development of manpower resources need to be carried out on a national scale. To introduce a nuclear programme, a special preparatory phase is required. During this phase the special conditions appertaining to the country are first considered, as are the evaluation and then the promotional aspects of the programme. In a second phase, all the partners involved in the implementation are considered, with reference to their roles and interrelationships. Their various tasks and obligations are fully assessed. This is a wide-ranging study covering, in addition to the construction of a nuclear power plant, the industrial collaboration and licensing agreements, and the utility operational training schemes. Finally, the third phase considers the different and necessary educational requirements, and the existent and developed level of the manpower, with respect to the scope and content of the know-how transfer. When all the relevant aspects have been considered, the expansion of the universities and educational establishments must be carried out. This whole phase needs to be started as early as possible because it involves a period of some years. (author)

  18. Mission related to regulation and development of the photovoltaic sector in France. Final report

    International Nuclear Information System (INIS)

    Charpin, J.M; Sine, A.; Helleisen, Ph.; Tlili, C.; Trink, C.; Stoffaes, Ch.

    2010-01-01

    This report first gives an overview of the development of the photovoltaic stock in France (high potential with a middle term development constrained by high costs, consequences of a very strong increase of demands at the end of 2009, perspective of development at a rather high rate). Then, it outlines and discusses the financial consequences of such a high rate development, and the inadequacy between industrial objectives and development rate. It presents a development plan for this sector, stresses the need to implement new purchase obligation measures before the summer 2010, and to define a global action plan to be implemented at the beginning of 2011 for the development of photovoltaic electricity. Elements of international comparison are finally proposed

  19. Development of model plans in three dimensional conformal radiotherapy for brain tumors

    International Nuclear Information System (INIS)

    Pyo, Hongryull; Kim, Gwieon; Keum, Kichang; Chang, Sekyung; Suh, Changok; Lee, Sanghoon

    2002-01-01

    Three dimensional conformal radiotherapy planning is being used widely for the treatment of patients with brain tumor. However, it takes much time to develop an optimal treatment plan, therefore, it is difficult to apply this technique to all patients. To increase the efficiency of this technique, we need to develop standard radiotherapy plans for each site of the brain. Therefore we developed several 3 dimensional conformal radiotherapy plans (3D plans) for tumors at each site of brain, compared them with each other, and with 2 dimensional radiotherapy plans. Finally model plans for each site of the brain were decided. Imaginary tumors, with sizes commonly observed in the clinic, were designed for each site of the brain and drawn on CT images. The planning target volumes (PTVs) were as follows; temporal tumor-5.7 x 8.2 x 7.6 cm, suprasellar tumor-3 x 4 x 4.1 cm, thalamic tumor-3.1 x 5.9 x 3.7 cm, frontoparietal tumor-5.5 x 7 x 5.5 cm, and occipitoparietal tumor-5 x 5.5 x 5 cm. Plans using parallel opposed 2-portals and/or 3 portals including fronto-vertex and 2 lateral fields were developed manually as the conventional 2D plans, and 3D noncoplanar conformal plans were developed using beam's eye view and the automatic block drawing tool. Total tumor dose was 54 Gy for a suprasellar tumor, 59.4 Gy and 72 Gy for the other tumors. All dose plans (including 2D plans) were calculated using 3D plan software. Developed plans were compared with each other using dose-volume histograms (DVH), normal tissue complication probabilities (NTCP) and variable dose statistic values (minimum, maximum and mean dose, D5, V83, V85 and V95). Finally a best radiotherapy plan for each site of brain was selected. 1) Temporal tumor; NTCPs and DVHs of the normal tissue of all 3D plans were superior to 2D plans and this trend was more definite when total dose was escalated to 72 Gy (NTCPs of normal brain 2D plans: 27%, 8% → 3D plans: 1%, 1%). Various dose statistic values did not show any

  20. Final Work Plan: Targeted Investigation at York, Nebraska

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, Lorraine M. [Argonne National Lab. (ANL), Argonne, IL (United States)

    2016-08-01

    The targeted investigation at York will be implemented in phases, so that data collected and interpretations developed at each stage of the program can be evaluated to guide subsequent phases most effectively. Section 2 of this Work Plan presents a brief overview of the York site, its geologic and hydrologic setting, and the previous CCC/USDA investigations. Section 3, outlines the proposed technical program for the targeted investigation, and Section 4 describes the investigative methods to be employed. A community relations plan is in Section 5, and Section 6 includes health and safety information. In addition to this site-specific Work Plan, the Master Work Plan (Argonne 2002) developed by Argonne for CCC/USDA investigations in Nebraska should be consulted for complete details of the methods and procedures to be used at York.

  1. Hanford Site Development Plan

    International Nuclear Information System (INIS)

    Hathaway, H.B.; Daly, K.S.; Rinne, C.A.; Seiler, S.W.

    1992-05-01

    The Hanford Site Development Plan (HSDP) provides an overview of land use, infrastructure, and facility requirements to support US Department of Energy (DOE) programs at the Hanford Site. The HSDP's primary purpose is to inform senior managers and interested parties of development activities and issues that require a commitment of resources to support the Hanford Site. The HSDP provides a land use plan for the Hanford Site and presents a picture of what is currently known and anticipated in accordance with DOE Order 4320.1B. Site Development Planning. The HSDP wig be updated annually as future decisions further shape the mission and overall site development process. Further details about Hanford Site development are defined in individual area development plans

  2. 1994 Site Development Plan: A plan with vision

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-01

    The 1994 Lawrence Livermore National Laboratory Site Development Plan has been developed during a period of great change and uncertainty. Our goal is to make possible the best use of the Laboratory`s resources to meet shifting national priorities in the post-Cold War world. Site Planning is an important component of the overall Laboratory strategic planning process. This plan focuses on opportunities for the Laboratory as well as on key site development issues including facility construction, redevelopment and reuse, site accessibility, and security. A major challenge is to achieve sufficient stability in the site planning and execution so that the processes of construction can occur efficiently while at the same time providing sufficient flexibility in site facilities so that a range of changing national needs can be accommodated. We are closely coupled to the DOE strategic planning process to meet this challenge.

  3. 75 FR 10308 - Fire Management Plan, Final Environmental Impact Statement, Record of Decision, Grand Canyon...

    Science.gov (United States)

    2010-03-05

    ... DEPARTMENT OF THE INTERIOR National Park Service Fire Management Plan, Final Environmental Impact... Statement for the Fire Management Plan, Grand Canyon National Park. SUMMARY: Pursuant to the National... the Record of Decision for the Fire Management Plan, Grand Canyon National Park, Arizona. On January...

  4. Planning of community heating systems modernization and development

    International Nuclear Information System (INIS)

    Mroz, Tomasz M.

    2008-01-01

    New approach to community heating systems modernization and development planning process has been proposed. It is based on the general decision making aid algorithm. The proposed algorithm takes into account both demand and supply side of community heat market modernization and development. The first step of algorithm - analytical step, refers to data base creation, which is needed for the description of community heating system energy, ecology and economic characteristics. Analysis of those characteristics allows for the identification of heating system market modernization and development potential scenarios. The second algorithm step - decision step, allows for the identification of the most compromise scenarios of system modernization and development. To make the planning process more transparent and to increase the influence of decision makers on the planning process the ELECTRE III method was chosen as the tool of decision aid. The ELECTRE III method is based on the construction of outranking relation and definition of pseudo-criterion. The iteration mode of method application allows the decision maker and analyst for the investigation of the sensitivity of final solution to the changing preference model. One of the methods of statistics - the creditability of mean range method was used for the determination of initial definition of pseudo-criterion. Proposed algorithm and decision aid method were employed for the case study analysis referring to the choice of the heating system for new developing urban area. (author)

  5. Development of Consensus Treatment Plans for Juvenile Localized Scleroderma

    Science.gov (United States)

    Li, Suzanne C.; Torok, Kathryn S.; Pope, Elena; Dedeoglu, Fatma; Hong, Sandy; Jacobe, Heidi T.; Rabinovich, C. Egla; Laxer, Ronald M.; Higgins, Gloria C.; Ferguson, Polly J.; Lasky, Andrew; Baszis, Kevin; Becker, Mara; Campillo, Sarah; Cartwright, Victoria; Cidon, Michael; Inman, Christi J; Jerath, Rita; O'Neil, Kathleen M.; Vora, Sheetal; Zeft, Andrew; Wallace, Carol A.; Ilowite, Norman T.; Fuhlbrigge, Robert C

    2013-01-01

    Objective To develop standardized treatment plans, clinical assessments, and response criteria for active, moderate to high severity juvenile localized scleroderma (jLS). Background jLS is a chronic inflammatory skin disorder associated with substantial morbidity and disability. Although a wide range of therapeutic strategies have been reported in the literature, a lack of agreement on treatment specifics and accepted methods for clinical assessment of have made it difficult to compare approaches and identify optimal therapy. Methods A core group of pediatric rheumatologists, dermatologists and a lay advisor was engaged by the Childhood Arthritis and Rheumatology Research Alliance (CARRA) to develop standardized treatment plans and assessment parameters for jLS using consensus methods/nominal group techniques. Recommendations were validated in two face-to-face conferences with a larger group of practitioners with expertise in jLS and with the full membership of CARRA, which encompasses the majority of pediatric rheumatologists in the U.S and Canada. Results Consensus was achieved on standardized treatment plans that reflect the prevailing treatment practices of CARRA members. Standardized clinical assessment methods and provisional treatment response criteria were also developed. Greater than 90% of pediatric rheumatologists responding to a survey (67% of CARRA membership) affirmed the final recommendations and agreed to utilize these consensus plans to treat patients with jLS. Conclusions Using consensus methodology, we have developed standardized treatment plans and assessment methods for jLS. The high level of support among pediatric rheumatologists will support future comparative effectiveness studies and enable the development of evidence-based guidelines for the treatment of jLS. PMID:22505322

  6. 76 FR 77249 - Winter Use Plan, Final Environmental Impact Statement Record of Decision, Yellowstone National...

    Science.gov (United States)

    2011-12-12

    ... DEPARTMENT OF THE INTERIOR National Park Service Winter Use Plan, Final Environmental Impact... Impact Statement for a Winter Use Plan, Yellowstone National Park. SUMMARY: Pursuant to Sec. 102(2)(C) of... Winter Use Plan for Yellowstone National Park, located in Idaho, Montana, and Wyoming. On December 5...

  7. 75 FR 43329 - Interim Final Rules for Group Health Plans and Health Insurance Issuers Relating to Internal...

    Science.gov (United States)

    2010-07-23

    ... 45 CFR Part 147 Interim Final Rules for Group Health Plans and Health Insurance Issuers Relating to... Interim Final Rules for Group Health Plans and Health Insurance Issuers Relating to Internal Claims and... of Labor; Office of Consumer Information and Insurance Oversight, Department of Health and Human...

  8. Thayer Lake Hydropower Development -- Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Matousek, Mark [ORENCO Hydropower, Palo Alto, CA (United States)

    2017-06-30

    The Thayer Lake Hydropower Development (THLD) has been under study since the late 1970’s as Angoon explored opportunities to provide lower cost renewable power to the Community and avoid the high cost of diesel generation. Kootznoowoo Inc. (Kootznoowoo), the tribal corporation for Angoon’s current and past residents, was provided the rights by Congress to develop a hydropower project within the Admiralty Island National Monument. This grant (DE-EE0002504) by the Department of Energy’s (DOE’s) Office of Indian Energy and a matching grant from the Alaska Energy Authority (AEA) were provided to Kootznoowoo to enable the design, engineering and permitting of this hydropower project on Thayer Creek. Prior to the grant, the USFS had performed a final environmental impact statement (FEIS) and issued a Record of Decision (ROD) in 2009 for a 1.2 MW hydropower project on Thayer Creek that would Angoon’s needs with substantial excess capacity for growth. Kootznoowoo hired Alaska Power & Telephone (AP&T) in 2013 to manage this project and oversee its development. AP&T and its subcontractors under Kootznoowoo’s guidance performed several activities, aligned with the task plan defined in the grant.

  9. Final environmental impact statement for the Nevada Test Site and off-site locations in the State of Nevada. Framework for the resource management plan, Volume 2

    International Nuclear Information System (INIS)

    1996-08-01

    The purpose of this document is to publicize how the U.S. Department of Energy Nevada Operations Office (DOE/NV) proposes to develop and use a Resource Management Plan for the Nevada Test Site (NTS) so the public could comment on and assist in the following activities: (1) Developing the methods for creating and using the plan; (2) Identifying the values people place on manmade and natural resources found on the NTS; (3) Developing the goals the DOE/NV will use to guide the conservation and use of those resources; (4) Identifying the management actions needed to meet constraints and resource management goals; and (5) Incorporating the principles of ecosystem management into land and resource management on the NTS. This framework for the Resource Management Plan was developed in conjunction with the Environmental Impact Statement for the Nevada Test Site and off-site locations in the state of Nevada (NTS EIS) to take advantage of the extensive data collection and public participation activities associated with the National Environmental Policy Act. After public input was received during the comment period for the Draft NTS EIS, DOE/NV revised this description of the Resource Management Plan and published it with the NTS Final EIS. This revision includes the goals DOE/NV has developed for managing resources and land-use constraints. It also includes the final plans for developing the Resource Management Plan. These plans will guide DOE/NV as it develops a Resource Management Plan in the coming years

  10. Nevada State plan; final approval determination. Occupational Safety and Health Administration (OSHA), U.S. Department of Labor. Final State plan approval--Nevada.

    Science.gov (United States)

    2000-04-18

    This document amends OSHA's regulations to reflect the Assistant Secretary's decision granting final approval to the Nevada State plan. As a result of this affirmative determination under section 18(e) of the Occupational Safety and Health Act of 1970, Federal OSHA's standards and enforcement authority no longer apply to occupational safety and health issues covered by the Nevada plan, and authority for Federal concurrent jurisdiction is relinquished. Federal enforcement jurisdiction is retained over any private sector maritime employment, private sector employers on Indian land, and any contractors or subcontractors on any Federal establishment where the land is exclusive Federal jurisdiction. Federal jurisdiction remains in effect with respect to Federal government employers and employees. Federal OSHA will also retain authority for coverage of the United States Postal Service (USPS), including USPS employees, contract employees, and contractor-operated facilities engaged in USPS mail operations.

  11. The development and validation of the advance care planning questionnaire in Malaysia.

    Science.gov (United States)

    Lai, Pauline Siew Mei; Mohd Mudri, Salinah; Chinna, Karuthan; Othman, Sajaratulnisah

    2016-10-18

    Advance care planning is a voluntary process whereby individual preferences, values and beliefs are used to aid a person in planning for end-of-life care. Currently, there is no local instrument to assess an individual's awareness and attitude towards advance care planning. This study aimed to develop an Advance Care Planning Questionnaire and to determine its validity and reliability among older people in Malaysia. The Advance Care Planning Questionnaire was developed based on literature review. Face and content validity was verified by an expert panel, and piloted among 15 participants. Our study was conducted from October 2013 to February 2014, at an urban primary care clinic in Malaysia. Included were those aged >50 years, who could understand English. A retest was conducted 2 weeks after the first administration. Participants from the pilot study did not encounter any problems in answering the Advance Care Planning Questionnaire. Hence, no further modifications were made. Flesch reading ease was 71. The final version of the Advance Care Planning Questionnaire consists of 66 items: 30 items were measured on a nominal scale, whilst 36 items were measured on a Likert-like scale; of which we were only able to validate 22 items, as the remaining 14 items were descriptive in nature. A total of 245 eligible participants were approached; of which 230 agreed to participate (response rate = 93.9 %). Factor analysis on the 22 items measured on a Likert-scale revealed four domains: "feelings regarding advance care planning", "justifications for advance care planning", "justifications for not having advance care planning: fate and religion", and "justifications for not having advance care planning: avoid thinking about death". The Cronbach's alpha values for items each domain ranged from 0.637-0.915. In test-retest, kappa values ranged from 0.738-0.947. The final Advance Care Planning Questionnaire consisted of 63 items and 4 domains. It was found to be a valid and

  12. ZONAL IMPACT ANALYSIS OF A STRATEGIC PLANNING APPROACH FOR LAND DEVELOPMENT CONTROLS

    Directory of Open Access Journals (Sweden)

    Karin LIMAPORNWANITCH

    2004-01-01

    Full Text Available Due to rapid urban developments in developing cities, the integration of land-use and transportation planning is very necessary. However, up-to-date land-use and transportation interaction planning is still difficult, because of rapid urbanization and complex relationships. The lack of human resources, budget, and necessary data are some of the hindrances. The planners in Bangkok have tried to utilize Traffic Impact Assessment (TIA in harmonizing land developments and transportation improvements, but without a complete land-use comprehensive plan, the TIA cannot effectively manage urbanization. This paper intends to propose a Zonal Impact Analysis (ZIA framework as a strategic planning tool to balance travel demands of land developments and performance of transportation systems over urban areas. First, the land-use planning situation in Bangkok is explained, afterwards the framework is described. The framework is applied into Bangkapi areas as a case study. Both single and simultaneous development cases are considered. It was found that more comprehensive development alternatives were established. The most suitable zone for a single project is Zone 179, as the advantages of location in the center of radial networks, so full accessibility can be provided. Without any network improvements in Zone 179, the simultaneous developments should be implemented in Zone 168 and 173, as high capacities of the expressway are available. The results give a better understanding on the characteristics of land-use and transportation planning in Bangkapi. Finally, it was emphasized that the ZIA framework is a strategic planning alternative to increase the capabilities of growth management for sustainable developments.

  13. Final rules relating to use of electronic communication and recordkeeping technologies by employee pension and welfare benefit plans. Notice of final rulemaking.

    Science.gov (United States)

    2002-04-09

    This document contains final rules under Title I of the Employee Retirement Income Security Act of 1974, as amended (ERISA), concerning the disclosure of certain employee benefit plan information through electronic media, and the maintenance and retention of employee benefit plan records in electronic form. The rules establish a safe harbor pursuant to which all pension and welfare benefit plans covered by Title I of ERISA may use electronic media to satisfy disclosure obligations under Title I of ERISA. The rules also provide standards concerning the use of electronic media in the maintenance and retention of records required by sections 107 and 209 of ERISA. The rules affect employee pension and welfare benefit plans, including group health plans, plan sponsors, administrators and fiduciaries, and plan participants and beneficiaries.

  14. Rock grouting. Current competence and development for the final repository

    International Nuclear Information System (INIS)

    Emmelin, Ann; Brantberger, Martin; Eriksson, Magnus; Gustafson, Gunnar; St ille, Haakan

    2007-06-01

    The report aims at presenting the overall state of grouting competence and development relating to the final repository and at motivating and giving detail to the grouting sections presented in the 2007 version of the overall SKB report 'Programme for research, development and demonstration of methods for the management and disposal of nuclear waste' that is presented to the government every three years. The report offers suggestions for principles for planning, design and execution of grouting and describes the further work thought to be necessary in order to meet the requirements of the final repository, that are currently given as working premises. This report does not aim to, and cannot, describe the grouting processes in detail. For details of current concepts, experience and development work, a list of references is provided. In Chapter 2, the task of sealing the underground repository is examined and an overall approach presented. Although the requirements related to this task are preliminary, it is made evident that they concern both the actual grouting results and the process leading to the achievement of these results. Chapter 3 is a conceptual description of grouting and the factors that govern the spreading of grout in the rock mass. It is intended as an introduction to Chapters 4-6, which describe the state of grouting competence and the tools available for the sealing of the final repository facility. Both common practice and cutting-edge research are dealt with in these chapters, mainly relying on references where available. Chapters 4 and 5 focus on the system consisting of the fundamental components the rock mass, the grout materials and the grouting technology, and how these system components interact whilst, in Chapter 6, the rock/grout technical system is viewed in a brief organizational context. Based on the requirements on results and the overall grouting process on the one hand and the current competence in grouting theory and practice on the

  15. Rock grouting. Current competence and development for the final repository

    Energy Technology Data Exchange (ETDEWEB)

    Emmelin, Ann (Swedish Nuclear Fuel and Waste Management Co., Stockholm (SE)); Brantberger, Martin (Ramboell (SE)); Eriksson, Magnus (Vattenfall Power Consultant (SE)); Gustafson, Gunnar (Chalmers Univ. of Technology, Goeteborg (SE)); Stille, Haakan (Royal Inst. of Technology, Stockholm (SE))

    2007-06-15

    The report aims at presenting the overall state of grouting competence and development relating to the final repository and at motivating and giving detail to the grouting sections presented in the 2007 version of the overall SKB report 'Programme for research, development and demonstration of methods for the management and disposal of nuclear waste' that is presented to the government every three years. The report offers suggestions for principles for planning, design and execution of grouting and describes the further work thought to be necessary in order to meet the requirements of the final repository, that are currently given as working premises. This report does not aim to, and cannot, describe the grouting processes in detail. For details of current concepts, experience and development work, a list of references is provided. In Chapter 2, the task of sealing the underground repository is examined and an overall approach presented. Although the requirements related to this task are preliminary, it is made evident that they concern both the actual grouting results and the process leading to the achievement of these results. Chapter 3 is a conceptual description of grouting and the factors that govern the spreading of grout in the rock mass. It is intended as an introduction to Chapters 4-6, which describe the state of grouting competence and the tools available for the sealing of the final repository facility. Both common practice and cutting-edge research are dealt with in these chapters, mainly relying on references where available. Chapters 4 and 5 focus on the system consisting of the fundamental components the rock mass, the grout materials and the grouting technology, and how these system components interact whilst, in Chapter 6, the rock/grout technical system is viewed in a brief organizational context. Based on the requirements on results and the overall grouting process on the one hand and the current competence in grouting theory and

  16. 76 FR 71598 - Pearl Harbor National Wildlife Refuge, Honolulu County, HI; Final Comprehensive Conservation Plan...

    Science.gov (United States)

    2011-11-18

    ...] Pearl Harbor National Wildlife Refuge, Honolulu County, HI; Final Comprehensive Conservation Plan and.../docs/HI-PI/docsjcpearl.htm . Email: [email protected] . Include ``Pearl Harbor final CCP'' in...`iwa, HI 96712. FOR FURTHER INFORMATION CONTACT: David Ellis, Project Leader, (808) 637-6330...

  17. Large shaft development test plan

    International Nuclear Information System (INIS)

    Krug, A.D.

    1984-03-01

    This test plan proposes the conduct of a large shaft development test at the Hanford site in support of the repository development program. The purpose and objective of the test plan is to obtain the information necessary to establish feasibility and to predict the performance of the drilling system used to drill large diameter shafts. The test plan is based upon drilling a 20 ft diameter shaft to a depth of 1,000 feet. The test plan specifies series of tests to evaluate the performance of the downhole assembly, the performance of the rig, and the ability of the system to cope with geologic hazards. The quality of the hole produced will also be determined. This test plan is considered to be preliminary in that it was prepared as input for the decision to determine if development testing is required in this area. Should the decision be made to proceed with development testing, this test plan shall be updated and revised. 6 refs., 2 figs., 3 tabs

  18. 78 FR 16286 - Neal Smith National Wildlife Refuge, Jasper County, IA; Final Comprehensive Conservation Plan and...

    Science.gov (United States)

    2013-03-14

    ...-FF03R06000] Neal Smith National Wildlife Refuge, Jasper County, IA; Final Comprehensive Conservation Plan and... the Environmental Assessment (EA) for Neal Smith National Wildlife Refuge (Refuge, NWR). In this final... . Include ``Neal Smith Final CCP'' in the subject line of the message. U.S. Mail: Neal Smith National...

  19. Radiation Hardened Telerobotic Dismantling System Development Final Report CRADA No. TC-1340-96

    Energy Technology Data Exchange (ETDEWEB)

    Smith, C. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Lightman, A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2017-09-27

    This project was a collaborative effort between the University of California, LLNL and RedZone Robotics, Inc. for the development of radiation-hardened telerobotic dismantling systems for use in applications such as nuclear facility remediation, nuclear accident response, and Chemobyltype remediation. The project supported the design, development, fabrication and testing of a Ukrainian robotic systems. The project was completed on time and within budget. All deliverables were completed. The final project deliverables were consistent with the plans developed in the original project with the exception that the fabricated systems remained in Ukraine.

  20. Organisational development in general practice: lessons from practice and professional development plans (PPDPs

    Directory of Open Access Journals (Sweden)

    Hocking Paul

    2000-12-01

    Full Text Available Abstract Background Improving the quality and effectiveness of clinical practice is becoming a key task within all health services. Primary medical care, as organised in the UK is composed of clinicians who work in independent partnerships (general practices that collaborate with other health care professionals. Although many practices have successfully introduced innovations, there are no organisational development structures in place that support the evolution of primary medical care towards integrated care processes. Providing incentives for attendance at passive educational events and promoting 'teamwork' without first identifying organisational priorities are interventions that have proved to be ineffective at changing clinical processes. A practice and professional development plan feasibility study was evaluated in Wales and provided the experiential basis for a summary of the lessons learnt on how best to guide organisational development systems for primary medical care. Results Practice and professional development plans are hybrids produced by the combination of ideas from management (the applied behavioural science of organisational development and education (self-directed adult learning theories and, in conceptual terms, address the lack of effectiveness of passive educational strategies by making interventions relevant to identified system wide needs. In the intervention, each practice participated in a series of multidisciplinary workshops (minimum 4 where the process outcome was the production of a practice development plan and a set of personal portfolios, and the final outcome was a realised organisational change. It was apparent during the project that organisational admission to a process of developmental planning needed to be a stepwise process, where initial interest can lead to a fuller understanding, which subsequently develops into motivation and ownership, sufficient to complete the exercise. The advantages of

  1. EMI Registry Development Plan

    CERN Document Server

    Memon, S.; Szigeti, G.; Field, L.

    2012-01-01

    This documents describes the overall development plan of the EMI Registry product, the plan focuses on the realisation of the EMI Registry specification as defined in the document. It is understood that during the course of the development phase the specification will likely evolve and the changes will be fed into the specification document.

  2. Development Plans and Life Plans: Knowledge Sharing?

    Directory of Open Access Journals (Sweden)

    Juan José Vieco Albarracín

    2010-02-01

    Full Text Available This article explores the possibilities of establishing knowledge sharing between governmental development plans and the “life plans” (planes de vida made by indigenous organizations, in particular the life plan of the Asociación de Autoridades Indígenas del Resguardo Tikuna, Cocama, Yagua (Aticoya, municipality of Puerto Nariño, Amazonas, Colombia. Colombia’s Constitution of 1991 created the ETI (Entidad Territorial Indígena,“indigenous territorial entity” as a territorial unit, just like municipalities, departments, and districts. This means that indigenous reservations (or “reserves” or “preserves” and associations should manage public funds, for which they must design a life plan. This inclusion and recognition of indigenous peoples entails that those life plans should articulate with the municipal, departmental, and national development plans. The article illustrates this situation by comparing two welfare programs –Resa (Red de Seguridad Alimentaria “Food Security Network” and Familias Guardabosques (“Forest Ranger Families”– and two income-generating productive and service (tourism projects carried out by Aticoya and the local indigenous councils of communities on the Amazon and Loretoyacu Rivers.

  3. Developing a business plan for a startup e-business

    OpenAIRE

    Vu, Khanh

    2013-01-01

    The purpose of this thesis is to develop an initial business plan for a startup fashion company that operates on the Internet in the Vietnamese market. To reach the target objective, the thesis first examines e-business from a theoretical perspective and considers its advantages and disadvantages. Secondly, the macro environment of the proposed business is analyzed, namely the country of Vietnam and its e-commerce environment. Finally, the outcome of the thesis is presented in the form of a b...

  4. Large shaft development test plan

    International Nuclear Information System (INIS)

    Krug, A.D.

    1984-03-01

    This test plan proposes the conduct of shaft liner tests as part of the large shaft development test proposed for the Hanford Site in support of the repository development program. The objectives of these tests are to develop techniques for measuring liner alignment (straightness), both construction assembly alignment and downhole cumulative alignment, and to assess the alignment information as a real time feedback to aid the installation procedure. The test plan is based upon installing a 16 foot ID shaft liner into a 20 foot diameter shaft to a depth of 1000 feet. This test plan is considered to be preliminary in that it was prepared as input for the decision to determine if development testing is required in this area. Should the decision be made to proceed with development testing, this test plan shall be updated and revised. 6 refs., 2 figs

  5. Review on the Significance of Local Plan for Coastal Reclamation Development: The Case of Malacca, Malaysia

    Directory of Open Access Journals (Sweden)

    Ishak Nor Syafa’ah

    2016-01-01

    Full Text Available A Development Plan acts as a planning and controlling instrument that helps to guide in decision making of current and future development. Therefore, in the Malaysian Town and Country Planning Act 1976 (Act 172, the provision of development plan from each level of the planning administration is stated in the Act under Section 6B till Section 16B. In examining the significance of one of the many development plans in Malaysia, i.e. the local plan, this paper therefore, focuses on the provision of a local plan by the Local Planning Authority (LPA of the said area. This paper, thus, aims to evaluate the Central Malacca Local Plan since Malacca is currently experiencing rapid growth in development along the coastal area. The primary data was obtained from interviews with the related planning authorities via face-to-face method. While, secondary data was gathered from related legal documents, policies and guidelines, as well as the existing development plan for the purpose of an in-depth data. Findings revealed incapability of the existing local plan to assist the development control in deciding the planning permission for reclaimed area. The existing local plan shows no zoning for coastal reclamation area because of the rapid growing development and time consuming procedure to amend the local plan according to the Act 172. In addition, the Act 172 and the process in amending the local plan should be more flexible and able to address the current issue efficiently. Finally, the paper concludes with a suggestion for further exploration in order to achieve an operative development process and functioning practice of the local plan.

  6. Development of the computer-aided process planning (CAPP system for polymer injection molds manufacturing

    Directory of Open Access Journals (Sweden)

    J. Tepić

    2011-10-01

    Full Text Available Beginning of production and selling of polymer products largely depends on mold manufacturing. The costs of mold manufacturing have significant share in the final price of a product. The best way to improve and rationalize polymer injection molds production process is by doing mold design automation and manufacturing process planning automation. This paper reviews development of a dedicated process planning system for manufacturing of the mold for injection molding, which integrates computer-aided design (CAD, computer-aided process planning (CAPP and computer-aided manufacturing (CAM technologies.

  7. Final disposal of spent nuclear fuel in Sweden. Some unresolved issues and challenges in the design and implementation of the forthcoming planning and EIA processes

    International Nuclear Information System (INIS)

    Bjarnadottir, H.; Hilding-Rydevik, T.

    2001-06-01

    The aim of the study is to highlight some unresolved and challenging issues in the forthcoming approximately six year long Environmental Impact Assessment (EIA) and planning process of the long-term disposal of spent nuclear fuel in Sweden. Different international and Nordic experiences of the processes for final disposal as well as from other development of similar scope, where experiences assumed to be of importance for final disposal of nuclear waste, have been described. Furthermore, issues relating to 'good EIA practice' as well as certain aspects of planning theory have also been presented. The current Swedish situation for the planning and EIA process of the final disposal of spent nuclear fuel was also been summarized. These different 'knowledge areas' have been compared and measured against our perception of the expectations towards the forthcoming process, put forward by different Swedish actors in the field. The result is a presentation of a number of questions and identification issues that the authors consider need special attention in the design and conduction of the planning and EIA process. The study has been realized through a literature survey and followed by reading and analysis of the written material. The main focus of the literature search was on material describing planning processes, actor perspectives and EIA. Material and literature on the technical and scientific aspects of spent nuclear fuel disposal was however deliberately avoided. There is a wealth of international and Swedish literature concerning final disposal of spent nuclear fuel - concerning both technical issues and issues concerning for example public participation and risk perception. But material of a more systematic and comparative nature (relating to both empirical and theoretical issues, and to practical experiences) in relation to EIA processes and communicative planning for final disposal of spent nuclear fuel seems to be more sparsely represented. Our perception of

  8. 75 FR 27121 - Interim Final Rules for Group Health Plans and Health Insurance Issuers Relating to Dependent...

    Science.gov (United States)

    2010-05-13

    ... 45 CFR Parts 144, 146, and 147 Group Health Plans and Health Insurance Issuers Relating to Dependent... 144, 146, and 147 RIN 0991-AB66 Interim Final Rules for Group Health Plans and Health Insurance... requirements for group health plans and health insurance issuers in the group and individual markets under...

  9. Radioactive waste management plan. Plan 82

    International Nuclear Information System (INIS)

    1982-06-01

    The report is the first account of the nuclear power utilities of Sweden about the plans for the final disposal of the radioactive waste products of the nuclear power. Part 1 describes the general background, the plans for research and development, including the necessary facilities. The time schedule and the calculated costs of the operations are presented. (G.B.)

  10. Integrated development and testing plan for the plutonium immobilization project

    International Nuclear Information System (INIS)

    Kan, T.

    1998-01-01

    This integrated plan for the DOE Office of Fissile Materials Disposition (MD) describes the technology development and major project activities necessary to support the deployment of the immobilization approach for disposition of surplus weapons-usable plutonium. The plan describes details of the development and testing (D and T) tasks needed to provide technical data for design and operation of a plutonium immobilization plant based on the ceramic can-in-canister technology (''Immobilization Fissile Material Disposition Program Final Immobilization Form Assessment and Recommendation'', UCRL-ID-128705, October 3, 1997). The plan also presents tasks for characterization and performance testing of the immobilization form to support a repository licensing application and to develop the basis for repository acceptance of the plutonium form. Essential elements of the plant project (design, construction, facility activation, etc.) are described, but not developed in detail, to indicate how the D and T results tie into the overall plant project. Given the importance of repository acceptance, specific activities to be conducted by the Office of Civilian Radioactive Waste Management (RW) to incorporate the plutonium form in the repository licensing application are provided in this document, together with a summary of how immobilization D and T activities provide input to the license activity. The ultimate goal of the Immobilization Project is to develop, construct, and operate facilities that will immobilize from about 18 to 50 tonnes (MT) of U.S. surplus weapons usable plutonium materials in a manner that meets the ''spent fuel'' standard (Fissile Materials Storage and Disposition Programmatic Environmental Impact Statement Record of Decision, ''Storage and Disposition Final PEIS'', issued January 14, 1997, 62 Federal Register 3014) and is acceptable for disposal in a geologic repository. In the can-in-canister technology, this is accomplished by encapsulating the

  11. Mission related to regulation and development of the photovoltaic sector in France. Final report; Mission relative a la regulation et au developpement de la filiere photovoltaique en France. Rapport final

    Energy Technology Data Exchange (ETDEWEB)

    Charpin, J.M; Sine, A.; Helleisen, Ph.; Tlili, C. [Inspection Generale des Finances - IGF, 75 - Paris (France); Trink, C.; Stoffaes, Ch. [Conseil General de l' Industrie de l' Energie et des Technologies - CGIET, 75 - Paris (France)

    2010-07-01

    This report first gives an overview of the development of the photovoltaic stock in France (high potential with a middle term development constrained by high costs, consequences of a very strong increase of demands at the end of 2009, perspective of development at a rather high rate). Then, it outlines and discusses the financial consequences of such a high rate development, and the inadequacy between industrial objectives and development rate. It presents a development plan for this sector, stresses the need to implement new purchase obligation measures before the summer 2010, and to define a global action plan to be implemented at the beginning of 2011 for the development of photovoltaic electricity. Elements of international comparison are finally proposed

  12. Low Impact Development Master Plan

    Energy Technology Data Exchange (ETDEWEB)

    Loftin, Samuel R. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-10-02

    This project creates a Low Impact Development (LID) Master Plan to guide and prioritize future development of LID projects at Los Alamos National Laboratory (LANL or the Laboratory). The LID Master Plan applies to developed areas across the Laboratory and focuses on identifying opportunities for storm water quality and hydrological improvements in the heavily urbanized areas of Technical Areas 03, 35 and 53. The LID Master Plan is organized to allow the addition of LID projects for other technical areas as time and funds allow in the future.

  13. Multiyear Program Plan for the High Temperature Materials Laboratory; FINAL

    International Nuclear Information System (INIS)

    Arvid E. Pasto

    2000-01-01

    Recently, the U.S. Department of Energy's (DOE) Office of Heavy Vehicle Technologies (OHVT) prepared a Technology Roadmap describing the challenges facing development of higher fuel efficiency, less polluting sport utility vehicles, vans, and commercial trucks. Based on this roadmap, a multiyear program plan (MYPP) was also developed, in which approaches to solving the numerous challenges are enumerated. Additional planning has been performed by DOE and national laboratory staff, on approaches to solving the numerous challenges faced by heavy vehicle system improvements. Workshops and planning documents have been developed concerning advanced aerodynamics, frictional and other parasitic losses, and thermal management. Similarly, the Heavy Vehicle Propulsion Materials Program has developed its own multiyear program plan. The High Temperature Materials Laboratory, a major user facility sponsored by OHVT, has now developed its program plan, described herein. Information was gathered via participation in the development of OHVT's overall Technology Roadmap and MYPP, through personal contacts within the materials-user community, and from attendance at conferences and expositions. Major materials issues for the heavy vehicle industry currently center on trying to increase efficiency of (diesel) engines while at the same time reducing emissions (particularly NO(sub x) and particulates). These requirements dictate the use of increasingly stronger, higher-temperature capable and more corrosion-resistant materials of construction, as well as advanced catalysts, particulate traps, and other pollution-control devices. Exhaust gas recirculation (EGR) is a technique which will certainly be applied to diesel engines in the near future, and its use represents a formidable challenge, as will be described later. Energy-efficient, low cost materials processing methods and surface treatments to improve wear, fracture, and corrosion resistance are also required

  14. Development of State Plan for Career Education in Alabama. Final Report.

    Science.gov (United States)

    Alabama State Dept. of Education, Montgomery.

    This state plan for career education in Alabama describes the first-year objectives and operational procedures of the State Advisory Council for Career Education. Activities of the following six task forces are reported: (1) needs assessment for grades K-12, (2) postsecondary needs assessment, (3) noneducational (business and industry) needs…

  15. 78 FR 12347 - Notice of Availability of the Proposed Resource Management Plan and Final Environmental Impact...

    Science.gov (United States)

    2013-02-22

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLWYR05000 L16100000.DQ0000 LXSS04 K0000] Notice of Availability of the Proposed Resource Management Plan and Final Environmental Impact Statement for the Lander Field Office Planning Area, WY AGENCY: Bureau of Land Management, Interior. ACTION...

  16. PLANNING EDUCATION AND SUSTAINABLE DEVELOPMENT: STUDENTS’ PERCEPTION AND KNOWLEDGE – A CASE FROM TURKEY

    Directory of Open Access Journals (Sweden)

    Ebru Cubukcu

    2009-03-01

    Full Text Available Sustainable development is one of the great challenges of 21st century for various disciplines including city and regional planning. Studies showed that city plans fail to promote sustainable development, design professionals have limited understanding of sustainability issues, and curriculums in design education schools do not put the necessary emphasis on sustainability concepts. However, no study has tested whether planning students’ have a different perception and understanding of sustainable development than other students. Thus, this study aims to understand attitudes of planning students towards sustainable development and compare planning students’ and other students’ knowledge about sustainable development. Data were collected by means of questionnaires, which asked questions about perception and attitudes towards sustainable development, source of information to improve sustainability knowledge, and level of knowledge for general, legal and architectural aspects of sustainability. One hundred ten volunteers (79 planning students, 31 general students participated in the study. Results showed that students thought that very little sustainable practice appears to be undertaken. Although, planning students thought that the sensitivity to sustainability determines an important percentage of their final grades in a studio project, they reported not using many of the sustainability principles in studios. In addition, planning students reported that they improve their understanding of sustainable development via classes, scientific articles and books. On the other hand, other students reported that they rely on visual and written media to improve their understanding of sustainable development. Despite those differences in sources of information, results showed that, planning students’ level of knowledge (for general, legal and architectural aspects of sustainability was not different than that of other students. In conclusion, although

  17. Advanced Reactor Technologies - Regulatory Technology Development Plan (RTDP)

    Energy Technology Data Exchange (ETDEWEB)

    Moe, Wayne L. [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2017-08-23

    This DOE-NE Advanced Small Modular Reactor (AdvSMR) regulatory technology development plan (RTDP) will link critical DOE nuclear reactor technology development programs to important regulatory and policy-related issues likely to impact a “critical path” for establishing a viable commercial AdvSMR presence in the domestic energy market. Accordingly, the regulatory considerations that are set forth in the AdvSMR RTDP will not be limited to any one particular type or subset of advanced reactor technology(s) but rather broadly consider potential regulatory approaches and the licensing implications that accompany all DOE-sponsored research and technology development activity that deal with commercial non-light water reactors. However, it is also important to remember that certain “minimum” levels of design and safety approach knowledge concerning these technology(s) must be defined and available to an extent that supports appropriate pre-licensing regulatory analysis within the RTDP. Final resolution to advanced reactor licensing issues is most often predicated on the detailed design information and specific safety approach as documented in a facility license application and submitted for licensing review. Because the AdvSMR RTDP is focused on identifying and assessing the potential regulatory implications of DOE-sponsored reactor technology research very early in the pre-license application development phase, the information necessary to support a comprehensive regulatory analysis of a new reactor technology, and the resolution of resulting issues, will generally not be available. As such, the regulatory considerations documented in the RTDP should be considered an initial “first step” in the licensing process which will continue until a license is issued to build and operate the said nuclear facility. Because a facility license application relies heavily on the data and information generated by technology development studies, the anticipated regulatory

  18. Advanced Reactor Technology -- Regulatory Technology Development Plan (RTDP)

    Energy Technology Data Exchange (ETDEWEB)

    Moe, Wayne Leland [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2015-05-01

    This DOE-NE Advanced Small Modular Reactor (AdvSMR) regulatory technology development plan (RTDP) will link critical DOE nuclear reactor technology development programs to important regulatory and policy-related issues likely to impact a “critical path” for establishing a viable commercial AdvSMR presence in the domestic energy market. Accordingly, the regulatory considerations that are set forth in the AdvSMR RTDP will not be limited to any one particular type or subset of advanced reactor technology(s) but rather broadly consider potential regulatory approaches and the licensing implications that accompany all DOE-sponsored research and technology development activity that deal with commercial non-light water reactors. However, it is also important to remember that certain “minimum” levels of design and safety approach knowledge concerning these technology(s) must be defined and available to an extent that supports appropriate pre-licensing regulatory analysis within the RTDP. Final resolution to advanced reactor licensing issues is most often predicated on the detailed design information and specific safety approach as documented in a facility license application and submitted for licensing review. Because the AdvSMR RTDP is focused on identifying and assessing the potential regulatory implications of DOE-sponsored reactor technology research very early in the pre-license application development phase, the information necessary to support a comprehensive regulatory analysis of a new reactor technology, and the resolution of resulting issues, will generally not be available. As such, the regulatory considerations documented in the RTDP should be considered an initial “first step” in the licensing process which will continue until a license is issued to build and operate the said nuclear facility. Because a facility license application relies heavily on the data and information generated by technology development studies, the anticipated regulatory

  19. From Classroom to Career Development Planning: Eportfolio Use Examples

    Directory of Open Access Journals (Sweden)

    Ana Coric Samardzija

    2014-12-01

    Full Text Available In this paper we will present several examples of different maturity levels of ePortfolio usage at the Faculty of Organization and Informatics, University of Zagreb, Croatia. Firstly, we will illustrate basic in-class uses of ePortfolio in which students are introduced with the ePortfolio concept, self-reflection, self-monitoring and knowledge management. The primary goal of this phase is to show students how to record, plan and improve their professional skills in order to facilitate their preparation for the labour market. This phase is also aimed at recording and showcasing of students’ work and self-assessment. The second example of ePortfolio usage in this paper concerns self-guidance monitoring at the postgraduate level, where it is used to monitor the activities and progress of PhD students as well as to simplify communication between supervisors and doctoral candidates. In addition, by using the ePortfolio pattern, doctoral students are encouraged to start planning their careers as scientific researchers and experts. Finally, we introduce an example of using ePortfolios for academic human resources management as part of institutional quality assurance. For that purpose, a career development plan was developed to collect and monitor the work and progress of academic staff (both young researchers and teaching assistants.

  20. Methane Hydrate Field Program: Development of a Scientific Plan for a Methane Hydrate-Focused Marine Drilling, Logging and Coring Program

    Energy Technology Data Exchange (ETDEWEB)

    Myers, Greg [Consortium for Ocean Leadership, Washington, DC (United States)

    2014-02-01

    This final report document summarizes the activities undertaken and the output from three primary deliverables generated during this project. This fifteen month effort comprised numerous key steps including the creation of an international methane hydrate science team, determining and reporting the current state of marine methane hydrate research, convening an international workshop to collect the ideas needed to write a comprehensive Marine Methane Hydrate Field Research Plan and the development and publication of that plan. The following documents represent the primary deliverables of this project and are discussed in summary level detail in this final report: Historical Methane Hydrate Project Review Report; Methane Hydrate Workshop Report; Topical Report: Marine Methane Hydrate Field Research Plan; and Final Scientific/Technical Report.

  1. Momentum: "Developing Masterful Marketing Plans."

    Science.gov (United States)

    Meservey, Lynne D.

    1988-01-01

    Describes how directors can plan and develop a written marketing plan which can increase enrollment at child care centers. Components of successful marketing plans include parent retention; program merchandising; staff and director training; sales promotions; networking; and enrichment programs/fundraising. (NH)

  2. Epistemic Planning

    DEFF Research Database (Denmark)

    Baral, Chitta; Bolander, Thomas; van Ditmarsch, Hans

    The seminar Epistemic Planning brought together the research communities of Dynamic Epistemic Logic, Knowledge Representation and Reasoning, and Automated Planning to address fundamental problems on the topic of epistemic planning. In the context of this seminar, dynamic epistemic logic...... investigates the formal semantics of communication and communicative actions, knowledge representation and reasoning focuses on theories of action and change, and automated planning investigates computational techniques and tools to generate plans. The original goals of the seminar were to develop benchmarks...... for epistemic planning, to explore the relationship between knowledge and belief in multi-agent epistemic planning, to develop models of agency and capability in epistemic planning and to explore action types and their representations (these originally separate goals were merged during the seminar), and finally...

  3. 77 FR 51044 - Laguna Cartagena National Wildlife Refuge, PR; Final Comprehensive Conservation Plan and Finding...

    Science.gov (United States)

    2012-08-23

    ... download the document from our Internet Site: http://southeast.fws.gov/planning/ under ``Final Documents... facilities and programs will be expanded. Specifically, improving parking areas, providing additional...

  4. Columbia Basin Wildlife Mitigation Project : Rainwater Wildlife Area Final Management Plan.

    Energy Technology Data Exchange (ETDEWEB)

    Childs, Allen

    2002-03-01

    This Draft Management Plan has been developed by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) to document how the Rainwater Wildlife Area (formerly known as the Rainwater Ranch) will be managed. The plan has been developed under a standardized planning process developed by the Bonneville Power Administration (BPA) for Columbia River Basin Wildlife Mitigation Projects (See Appendix A and Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into a 5-Year Action Plan that will focus our management actions and prioritize funding during the Fiscal 2001-2005 planning period. This plan is a product of nearly two years of field studies and research, public scoping, and coordination with the Rainwater Advisory Committee. The committee consists of representatives from tribal government, state agencies, local government, public organizations, and members of the public. The plan is organized into several sections with Chapter 1 providing introductory information such as project location, purpose and need, project goals and objectives, common elements and assumptions, coordination efforts and public scoping, and historical information about the project area. Key issues are presented in Chapter 2 and Chapter 3 discusses existing resource conditions within the wildlife area. Chapter 4 provides a detailed presentation on management activities and Chapter 5 outlines a monitoring and evaluation plan for the project that will help assess whether the project is meeting the intended purpose and need and the goals and objectives. Chapter 6 displays the action plan and provides a prioritized list of actions with associated budget for the next five year period. Successive chapters contain appendices, references, definitions, and a glossary.

  5. Ecology of Greater Sage-Grouse in the Bi-State Planning Area Final Report, September 2007

    Science.gov (United States)

    Casazza, Michael L.; Overton, Cory T.; Farinha, Melissa A.; Torregrosa, Alicia; Fleskes, Joseph P.; Miller, Michael R.; Sedinger, James S.; Kolada, Eric J.

    2009-01-01

    completed in 2004 and 2005 addressed each of the specific objectives and this final report focuses on the biological information gathered in support of local conservation efforts. Participation in the development of the Bi-State Local Area Conservation Plan was accomplished on multiple scales. Beginning in the fall of 2002, USGS personnel began participating in meetings of local stakeholders involved in the development of a sage-grouse conservation plan for the Bi-State planning area. This included attendance at numerous local PMU group meetings and field trips as well as participating on the technical advisory committee (TAC) for the Bi-State group. Whenever appropriate, ongoing results and findings regarding sage-grouse ecology in the local area were incorporated into these working group meetings. In addition, the USGS partnered with CDFG to help reorganize one of the local PMU groups (South Mono) and edited that portion of the Bi-State plan. The USGS also worked closely with CDFG to draft a description of the state of knowledge for sage-grouse genetic information for inclusion in the Bi-State Conservation Plan. The first edition of the Bi-State Conservation Plan for Greater Sage-Grouse was completed in June 2004 (Bi-State Sage-grouse Conservation Team 2004). This report is organized primarily by PMU to facilitate the incorporation of these research findings into the individual PMU plans that compose the Bi-State plan. Information presented in this report was derived from over 7,000 radio-telemetry locations obtained on 145 individual sage-grouse during a three year period (2003-2005). In addition, we collected detailed vegetation measurements at over 590 habitat sampling plots within the study area including canopy cover, shrubs, forbs, and grasses diversity. Vegetation data collection focused on sage-grouse nests, and brood-use areas. Additionally we collected data at random sites to examine sage-grouse habitat relationships within the study area. The majori

  6. 75 FR 69709 - Office of New Reactors; Notice of Availability of the Final Staff Guidance; Standard Review Plan...

    Science.gov (United States)

    2010-11-15

    ... the Final Staff Guidance; Standard Review Plan, Section 13.6.6, Revision 0 on Cyber Security Plan... Reports for Nuclear Power Plants,'' Section 13.6.6, Revision 0 on ``Cyber Security Plan'' (Agencywide... reviews to amendments to licenses for operating reactors or for activities associated with review of...

  7. Final Report: African Power/Energy and Environmental Development Plan, July 1, 1994 - August 21, 1999

    Energy Technology Data Exchange (ETDEWEB)

    Butler, John M.

    1999-08-21

    In 1994 AEF signed a Cooperative Agreement with DOE to address a program called the African Power /Energy and Environmental Development Plan. The Program initially addressed five area: (1) Historical Black Colleges and Universities Energy/Environmental Program; (2) The Department of Energy and United States Private Industry Africa Program; (3) The Annual United States Energy Study Tour; (4) South African Training Program, and (5) South African Environmental Program. The programs were implemented in conjunction with DOE, institutions, agencies and the private sector support in the USA and within African nations. AEF has worked with government and technical representatives from 13 African nations and expanded the program to address sponsorship of South African students in Historical Black Colleges and Universities, supporting DOE trade missions through participation and planning, and giving presentations in the U.S., and Africa regarding business opportunities in the African energy sector. The programs implemented have also opened doors for the US private sector to seek business opportunities in Africa and for African nations to gain exposure to US products and services.

  8. City of North Vancouver greenhouse gas local action plan : final report

    International Nuclear Information System (INIS)

    Hood, I.

    2005-02-01

    This paper presented details of a greenhouse gas (GHG) local action plan developed as a result of the City of North Vancouver's participation in the Partners for Climate Protection Program (PCPP). The plan is intended to better manage the impacts of urban development related to GHG and air quality, while also achieving community objectives related to affordable housing, transportation management, job creation and economic development. The report reviewed the local emissions inventory in addition to various programs, plans, policies and by-laws relating to energy management. Potential policies and programs were identified to achieve GHG emissions reductions in accordance with the PCPP. A plan for emissions reductions was also presented. A situation analysis was presented with details of population, transportation, residential and commercial building and industry. Solid waste management and transportation plans were outlined. A GHG emissions profile and forecast was presented. An outline of a GHG management framework included information on initiatives in the city as well as details of public consultation feedback. A program implementation plan includes forecasts of the program's impact, as well as details of program delivery and a performance measurement framework. Proposed initiatives in the plan included new building guidelines; fuel switching for light and heavy duty vehicles; driver training and enhanced vehicle maintenance programs; and, an environmental procurement policy. Community programs include residential and commercial building retrofits; land use planning; support for community energy systems; green building design guidelines; transportation demand management; and, public engagement and outreach programs. 21 tabs., 9 figs

  9. Master plan study - District heating Sillamaee municipality. Estonia. Final report. Appendices for chapter 9

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    The appendices to the final report on the master plan study on district heating in the municipality in Estonia, chapter nine, gives data related to general economic assumptions for financial and economic calculations, fuel consumption, financing, prices, fuel consumption. (ARW)

  10. Development of preoperative planning software for transforaminal endoscopic surgery and the guidance for clinical applications.

    Science.gov (United States)

    Chen, Xiaojun; Cheng, Jun; Gu, Xin; Sun, Yi; Politis, Constantinus

    2016-04-01

    Preoperative planning is of great importance for transforaminal endoscopic techniques applied in percutaneous endoscopic lumbar discectomy. In this study, a modular preoperative planning software for transforaminal endoscopic surgery was developed and demonstrated. The path searching method is based on collision detection, and the oriented bounding box was constructed for the anatomical models. Then, image reformatting algorithms were developed for multiplanar reconstruction which provides detailed anatomical information surrounding the virtual planned path. Finally, multithread technique was implemented to realize the steady-state condition of the software. A preoperative planning software for transforaminal endoscopic surgery (TE-Guider) was developed; seven cases of patients with symptomatic lumbar disc herniations were planned preoperatively using TE-Guider. The distances to the midlines and the direction of the optimal paths were exported, and each result was in line with the empirical value. TE-Guider provides an efficient and cost-effective way to search the ideal path and entry point for the puncture. However, more clinical cases will be conducted to demonstrate its feasibility and reliability.

  11. Analysis of Development Plans from Communications Perspective

    Directory of Open Access Journals (Sweden)

    Zohreh Shahghasemi

    2016-12-01

    Full Text Available The movement towards the goals of "Vision plan 1404" needs the perception of the requirements to prepare plans for achieving the favorite objectives of development. With the advent of the information age, the rules of development policy-making strongly have changed in the world and also unique opportunities areprovided by variables of communications for countries that have been in early stages of development. Based on this, considering the communications in macro-level and in the political, social, economic and cultural development plans is important and necessary. This requires a review and pathology of previous plans and evaluation of their strengths and weaknesses for preparing of more comprehensive future plans. Themain question of this study is: what is the approach of development plans to communications section after Islamic revolution?  Which aspects of communications are considered, and what aspects are ignored?  This study analyzes five development plans after the revolution, by using of qualitative content analysis. Results show that in all five-year plans the focus was on hardware and quantitative dimensions of communication development and media, but qualitative and content aspects, such as the right to universal access to information, freedom to obtain and disseminate information within the constitution, freedom of speech and press, a move towards the information society and knowledge-based, also other dimensions of communications such as human, traditional and social communication has been less considered. In the fourth development plan that is "knowledge" – centered, new fields of communications has been studied comprehensively in comparison to other plans. According to these approaches and new scientific and experimental perspectives, this paper suggests further engagement in communications necessity for development policy-making.

  12. Comments on "Women, Development Planning and Government Policies in Pakistan".

    Science.gov (United States)

    Hafeez, S

    1992-01-01

    Commentary on Shahnaz and Bilquees Raza's paper on women in development in Pakistan is supportive of the content analysis of the Sixth and Seventh 5-Year Plans and policies, but critical of the methods used n the analysis. The parallel to survey research methods was made in that there was a specification of 1) the unit of analysis (reference to each policy measure, each chapter, each page of the plan), 2) the rationale for the plan, 3) specific objectives of the examination, and 4) the criteria for analysis. Missing also was the identification of policy trends from the Fourth and Fifth 5-Year Plans. The question is never answered as to why gender issues were not directed to the agricultural sector. The conclusion that there was a hugh gap between intentions and implementation was an issue not unique to women's issues, and a deeper analysis may have been required in order to understand the nature and magnitude of the gaps for women's policies and their productive roles. Questions should have been directed to the issues of the root causes of gaps in planning and implementation of policies and programs for women in development, and the identification of quantitative and qualitative indicators of gaps. Questions arise as to whether the gaps have changed with changes in the strength of political and social will in various decades. Recognition was given by the authors to the low budget allocations between 1955 and 1970 to education and health which affected both men and women, but there was scant mention of the strong social, not political, will to enhance women's welfare prevalent at this time. Information was lacking on the differences between the Sixth and Seventh sectoral plans for agricultural employment and women and the working groups plans that did include women in agricultural employment; the question is why the working plans were not incorporated into the final plans, and why the working groups did not protest this omission. The lack of political and social

  13. Final disposal of spent nuclear fuel in Sweden. Some unresolved issues and challenges in the design and implementation of the forthcoming planning and EIA processes

    Energy Technology Data Exchange (ETDEWEB)

    Bjarnadottir, H.; Hilding-Rydevik, T. [Nordregio, Stockholm (Sweden)

    2001-06-01

    The aim of the study is to highlight some unresolved and challenging issues in the forthcoming approximately six year long Environmental Impact Assessment (EIA) and planning process of the long-term disposal of spent nuclear fuel in Sweden. Different international and Nordic experiences of the processes for final disposal as well as from other development of similar scope, where experiences assumed to be of importance for final disposal of nuclear waste, have been described. Furthermore, issues relating to 'good EIA practice' as well as certain aspects of planning theory have also been presented. The current Swedish situation for the planning and EIA process of the final disposal of spent nuclear fuel was also been summarized. These different 'knowledge areas' have been compared and measured against our perception of the expectations towards the forthcoming process, put forward by different Swedish actors in the field. The result is a presentation of a number of questions and identification issues that the authors consider need special attention in the design and conduction of the planning and EIA process. The study has been realized through a literature survey and followed by reading and analysis of the written material. The main focus of the literature search was on material describing planning processes, actor perspectives and EIA. Material and literature on the technical and scientific aspects of spent nuclear fuel disposal was however deliberately avoided. There is a wealth of international and Swedish literature concerning final disposal of spent nuclear fuel - concerning both technical issues and issues concerning for example public participation and risk perception. But material of a more systematic and comparative nature (relating to both empirical and theoretical issues, and to practical experiences) in relation to EIA processes and communicative planning for final disposal of spent nuclear fuel seems to be more sparsely represented

  14. Final environmental impact statement, Beaufort Sea oil and gas development/Northstar Project. Appendix A: BP Exploration (Alaska) Inc. Final project description - Revision 1, March 27, 1997

    International Nuclear Information System (INIS)

    1999-02-01

    BP Exploration (Alaska) Inc. (BPXA) submitted a permit application to the US Army Engineer District, Alaska to initiate the review process for BPXA's plans to develop and produce oil and gas from the Northstar Unit. This report contains Appendix A of an Environmental Impact Statement which was undertaken to identify and evaluate the potential effects the proposed project may have on the environment. This document is the Northstar Development Project, Final Project Description, Revision 1 for BPXA Northstar Project

  15. 2013 Nutrition Risk Research Plan Review Final Report. Research Plan Review for: The Risk Factor of Inadequate Nutrition

    Science.gov (United States)

    2014-01-01

    The 2013 Nutrition Risk Standing Review Panel (from here on referred to as the SRP) was impressed by the degree of progress the nutrition discipline has made with the research plan presented since the 2012 Nutrition Risk SRP WebEx/teleconference. The scientists and staff associated with the nutrition discipline have, in addition, continued their impressive publication track record. Specifically the SRP found that the novel and important progress in the ocular health research area (Gap N7.3) represents an important advance in understanding the etiology and potential countermeasures for this condition and thinks that the work will not only be valuable for vision, but may have implications for cardiovascular health, as well. The SRP also considered the bone countermeasure data presented a potentially valuable tool for investigating bone metabolism under the unique conditions of space travel, specifically the innovation of variable use of stable Ca isotopes for bone synthesis and equal contribution for bone to investigate bone metabolism, as well as, the impact of the advanced resistive exercise device (ARED) on body composition during spaceflight. Finally, the SRP considers the planned Integrated Nutrition task to be an important and necessary strategic part of the research plan. The SRP is concerned that the risks observed in previous research on Low Earth Orbit (LEO) may not capture all the risks of longer duration flight beyond LEO. In particular, the SRP believes that there may be a much greater likelihood of an intensified chronic inflammatory response compared to the very minimal evidence seen to date and that modest effects seen in LEO, such as the reduction in appetite, may not predict an absence in longer duration flight out of LEO. The added complications of longer duration flight, greater bio-behavioral stress, radiation exposure, poorer communication, and inability to respond to unforeseen exigencies may create different risks. Thus, preparation for

  16. Advanced Reactor Technology -- Regulatory Technology Development Plan (RTDP)

    International Nuclear Information System (INIS)

    Moe, Wayne Leland

    2015-01-01

    This DOE-NE Advanced Small Modular Reactor (AdvSMR) regulatory technology development plan (RTDP) will link critical DOE nuclear reactor technology development programs to important regulatory and policy-related issues likely to impact a ''critical path'' for establishing a viable commercial AdvSMR presence in the domestic energy market. Accordingly, the regulatory considerations that are set forth in the AdvSMR RTDP will not be limited to any one particular type or subset of advanced reactor technology(s) but rather broadly consider potential regulatory approaches and the licensing implications that accompany all DOE-sponsored research and technology development activity that deal with commercial non-light water reactors. However, it is also important to remember that certain ''minimum'' levels of design and safety approach knowledge concerning these technology(s) must be defined and available to an extent that supports appropriate pre-licensing regulatory analysis within the RTDP. Final resolution to advanced reactor licensing issues is most often predicated on the detailed design information and specific safety approach as documented in a facility license application and submitted for licensing review. Because the AdvSMR RTDP is focused on identifying and assessing the potential regulatory implications of DOE-sponsored reactor technology research very early in the pre-license application development phase, the information necessary to support a comprehensive regulatory analysis of a new reactor technology, and the resolution of resulting issues, will generally not be available. As such, the regulatory considerations documented in the RTDP should be considered an initial ''first step'' in the licensing process which will continue until a license is issued to build and operate the said nuclear facility. Because a facility license application relies heavily on the data and information generated by

  17. Computer-aided dispatch--traffic management center field operational test final detailed test plan : WSDOT deployment

    Science.gov (United States)

    2003-10-01

    The purpose of this document is to expand upon the evaluation components presented in "Computer-aided dispatch--traffic management center field operational test final evaluation plan : WSDOT deployment". This document defines the objective, approach,...

  18. 75 FR 34537 - Interim Final Rules for Group Health Plans and Health Insurance Coverage Relating to Status as a...

    Science.gov (United States)

    2010-06-17

    ... 45 CFR Part 147 Group Health Plans and Health Insurance Coverage Relating to Status as a... for Group Health Plans and Health Insurance Coverage Relating to Status as a Grandfathered Health Plan... and Insurance Oversight, Department of Health and Human Services. ACTION: Interim final rules with...

  19. 78 FR 25973 - Final Environmental Impact Statement for the Real Property Master Plan at the Presidio of...

    Science.gov (United States)

    2013-05-03

    ... to improve the learning environment and quality of life at the POM installation. The Final EIS... are also planned to Leadership in Energy and Environmental Design standards to conserve resources. The... the Chamberlain Library on the OMC. An electronic version of the Final EIS can be viewed or downloaded...

  20. Development of a Mobile App for Family Planning Providers.

    Science.gov (United States)

    Halsall, Viannella; Rogers, Jennifer; Witt, Jacki; Song, Sejun; Nguyen, Hoang Duc Huy; Kelly, Patricia

    To provide an overview of lessons learned during the development process of an app for iOS and Android based on national recommendations for providing quality family planning services. After a review of existing apps was conducted to determine whether an app of clinical recommendations for family planning existed, a team of clinicians, training specialists, and app developers created a resource app by first drafting a comprehensive content map. A prototype of the app was then pilot tested using smart tablets by a volunteer convenience sample of women's healthcare professionals. Outcomes measured included usability, acceptability, download analytics, and satisfaction by clinicians as reported through an investigator-developed tool. Sixty-nine professionals tested a prototype of the app, and completed a user satisfaction tool. Overall, user feedback was positive, and a zoom function was added to the final version as a result of the pilot test. Within 3 months of being publicly available, the app was downloaded 677 times, with 97% of downloads occurring on smart phones, 76% downloads occurring on iOS devices, and 24% on Android devices. This trend persisted throughout the following 3 months. Clinicians with an interest in developing an app should consider a team approach to development, pilot test the app prior to wider distribution, and develop a web-based version of the app to be used by clinicians who are unable to access smart devices in their practice setting.

  1. The Strategic Plan for Tourism Development in Italy

    Directory of Open Access Journals (Sweden)

    Silvia ANGELONI

    2013-06-01

    Full Text Available Conceptual works on tourism destination competitiveness affirm the central importance of planning the process of value creation within destination. Italy is an emblematic case of why and how a leading tourism destination may lose competitiveness along the years. Up to the 1980s Italy was in fact the top international tourism destination, but then such ranking gradually decreased, because of more complexity of sector and, over all, because of marginality of tourism in the government agenda and more in general of the country. After years of strategic myopia, Italy finally has a tool that formalizes its vision and indicates the key factors that can be leveraged in order to regain ground. In 2013, Italy adopted a National Strategic Plan. Therefore, this paper aims to describe an important turning point in tourism policies for the economic and cultural development of Italy. The research highlights the problematic areas of Italy’s tourism industry and explains how a new approach should make the Italian destination able to successfully compete on the international tourism market.

  2. Computer-aided dispatch--traffic management center field operational test final test plans : state of Utah

    Science.gov (United States)

    2004-01-01

    The purpose of this document is to expand upon the evaluation components presented in "Computer-aided dispatch--traffic management center field operational test final evaluation plan : state of Utah". This document defines the objective, approach, an...

  3. Consistency and Reconciliation Model In Regional Development Planning

    Directory of Open Access Journals (Sweden)

    Dina Suryawati

    2016-10-01

    Full Text Available The aim of this study was to identify the problems and determine the conceptual model of regional development planning. Regional development planning is a systemic, complex and unstructured process. Therefore, this study used soft systems methodology to outline unstructured issues with a structured approach. The conceptual models that were successfully constructed in this study are a model of consistency and a model of reconciliation. Regional development planning is a process that is well-integrated with central planning and inter-regional planning documents. Integration and consistency of regional planning documents are very important in order to achieve the development goals that have been set. On the other hand, the process of development planning in the region involves technocratic system, that is, both top-down and bottom-up system of participation. Both must be balanced, do not overlap and do not dominate each other. regional, development, planning, consistency, reconciliation

  4. Environment: Development plan 1993

    International Nuclear Information System (INIS)

    1992-01-01

    The concept of sustainable development is gradually being incorporated into the activities of Hydro-Quebec as part of that utility's environmental policy. In its proposed development plan, Hydro-Quebec's principal strategic environmental orientations comprise making environmental concerns an integral part of the planning process, managing impacts associated with the construction of generating and transmission facilities, and evaluating the utility's environmental performance. The approaches used, tools to be developed, and information required in each of these orientations are described. Issues considered include the strategic choices available for meeting electricity requirements, including renewable energy sources; the evaluation of environmental externalities; the use of environmental impact assessment studies and environmental monitoring; relationships with native peoples and mitigation of the social impacts of northern hydroelectric development; protection and management of natural and human habitats; the utility's contribution to regional development; management of wastes and rights-of-way; and environmental auditing. 1 tab

  5. Neutral-beam development plan, FY 1982-1987

    International Nuclear Information System (INIS)

    1981-09-01

    The following chapters are included: (1) status of BNL negative ion source development, (2) source development program plan, (3) status of beam transport and acceleration, (4) accelerator development program plan, (5) neutralizer concepts, (6) neutralization program plan, (7) neutral beam systems, (8) test facilities, (9) program milestones and time schedules, (10) organization and Grumman participation, and (11) funding tables

  6. Evaluation of Plan Implementation: Peri-urban Development and the Shanghai Master Plan 1999-2020

    Directory of Open Access Journals (Sweden)

    Jinghuan He

    2015-01-01

    Full Text Available Since the 1980s China has experienced unprecedented urbanisation as a result of a series of reforms promoting rapid economic development. Shanghai, like the other big cities along China’s coastline, has witnessed extraordinary growth in its economy and population with industrial development and rural-to-urban migration generating extensive urban expansion. Shanghai’s GDP growth rate has been over 10 per cent for more than 15 years. Its population in 2013 was estimated at 23.47 million, which is double its size in 1979. The urban area enlarged by four times from 644 to 2,860 km2 between 1977 and 2010. Such demanding growth and dramatic changes present big challenges for urban planning practice in Shanghai. Plans have not kept up with development and the mismatch between the proposals in plans and the actual spatial development has gradually increased, reaching a critical level since 2000. The mismatch in the periurban areas is more notable than that in the existing urban area, but there has not been a systematic review of the relationship between plan and implementation. Indeed, there are few studies on the evaluation of plan implementation in China generally. Although many plans at numerous spatial levels are successively prepared and revised, only few of them have been evaluated in terms of their effectiveness and implementation.  This particularly demanding context for planning where spatial development becomes increasingly unpredictable and more difficult to influence presents an opportunity to investigate the role of plans under conditions of rapid urbanisation. The research project asks to what extent have spatial plans influenced the actual spatial development in the peri-urban areas of Shanghai? The research pays particular attention to the role of the Shanghai Master Plan 1999-2020 (Plan 1999. By answering the main research question this study seeks to contribute to a better understanding of present planning practice in Shanghai

  7. Old water structures. River Kullaa as an example: their history, present state and plans for development

    International Nuclear Information System (INIS)

    Koeykkae, S.; Siirala, M.

    1996-01-01

    The aim was to make an inventory of the structures and buildings relating to the history of the use of hydropower along the River Kullaa, which runs into the River Kokemaeki, and to determine how they could be conserved and used in future. Their history and the 1990-91 status will serve as starting points for a master scheme, local plans and plans for individual rapids. The publication first gives a general account of the history of the use of hydropower and the development of hydropower plants. Information has been collected on the establishment and development of structures along the River Kullaa. The 1990-91 status has been established on the basis of inventories and measurements made in the field. The master scheme first examines the River Kullaa and its structures as a whole. Along the river there are three areas, whose development is discussed in the local plans. Finally, plans for the individual rapids are presented for three sites. (author)

  8. Planning for risk-informed/performance-based fire protection at nuclear power plants. Final report

    International Nuclear Information System (INIS)

    Najafi, B.; Parkinson, W.J.; Lee, J.A.

    1997-12-01

    This document presents a framework for discussing issues and building consensus towards use of fire modeling and risk technology in nuclear power plant fire protection program implementation. The plan describes a three-phase approach: development of core technologies, implementation of methods, and finally, case studies and pilot applications to verify viability of such methods. The core technologies are defined as fire modeling, fire and system tests, use of operational data, and system and risk techniques. The implementation phase addresses the programmatic issues involved in implementing a risk-informed/performance-based approach in an integrated approach with risk/performance measures. The programmatic elements include: (1) a relationship with fire codes and standards development as defined by the ongoing effort of NFPA for development of performance-based standards; (2) the ability for NRC to undertake inspection and enforcement; and (3) the benefit to utilities in terms of cost versus safety. The case studies are intended to demonstrate applicability of single issue resolution while pilot applications are intended to check the applicability of the integrated program as a whole

  9. Strategic planning of the National Direction of Nuclear Technology: period 2002-2005 last report; Planificacion estrategica de la Direccion Nacional de Tecnologia Nuclear: periodo 2002-2005 informe final

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-06-01

    The final report of strategic planning describes the uses and applications of the Nuclear Technology, situation, tendencies so much at international level as national, institutional organization of the Nuclear Sector in the Uruguay, assignment of the DNTN, nuclear politics of the Uruguay, development of the Net or Nuclear Sector and model proposed for Uruguay, general conclusions and Strategic Plan.

  10. Forward-Looking Planning of Technology Development

    Directory of Open Access Journals (Sweden)

    Katarzyna Halicka

    2015-12-01

    Full Text Available The main aim of this article is to adapt the Future-Oriented Technology Analysis (FTA to prospective planning of technology development. Firstly, the article presents the assumptions, methods and idea, as well as the concept of the FTA method. Moreover, selected publications on the use of this method were analysed. Then, an original, base model of forward-looking planning of technology development was constructed and presented. The end result of this process will be the development of the localized in time, presented in graphic form, action plan referred to as the route of technology development. Basing on the literature review and the research projects a preliminary route of development of arbitrarily chosen technology was also built and presented.

  11. Wanted: A World Development Plan

    NARCIS (Netherlands)

    J. Tinbergen (Jan)

    1968-01-01

    textabstractDevelopment planning has become a routine activity for large numbers of corporations as well as for public authorities at various levels, particularly national governments. In quite a few national planning agencies extensive analyses of the probable expansion of world supply and demand

  12. 78 FR 10606 - Final Management Plan and Environmental Assessment for Monitor National Marine Sanctuary: Notice...

    Science.gov (United States)

    2013-02-14

    ... Environmental Assessment for Monitor National Marine Sanctuary: Notice of Public Availability AGENCY: Office of National Marine Sanctuaries (ONMS), National Ocean Service (NOS), National Oceanic and Atmospheric... releasing the final management plan and environmental assessment for Monitor National Marine Sanctuary. DATE...

  13. Issues in regional planning and development in Nigeria

    Directory of Open Access Journals (Sweden)

    Oladayo Ramon Ibrahim

    2017-10-01

    Full Text Available Till date,Nigeria can not boast of a specific, well-formulated, clear regional development policy framework despite several urban planning, development and governance initiatives including passage of regulations at both federal and state government levels that have been undertaken since independence by successive post- colonial governments. Most of the country's claims of regional development are products of other policies, and intentions, which do not have any bearing on, deliberate regional planning policies. Policy and decision-making on development planning often do not incorporate the implications of the ways in which we use land and the consequences for different places (economic planning. The neglect of place, in particular, the way that different policies combine to affect places in different ways (regional planning, has contributed to a range of negative economic, social and environmental outcomes. This paper relies mainly on the secondary data and literature exploration to demonstrate that the little role accorded to spatial planning, especially, regional planning, in the development efforts is largely responsible for the underdevelopment, imbalance, and inequalities in the country, as well as poverty of the citizens. The conclusion of the paper is that regional planning should be an integral part and complementary to economic planning in the national development planning of the country. For regional planning to aid in the development of the country and promote the well-being of the citizens, appropriate recommendations have been included in the paper.

  14. Planning the Development of Measurement and Evaluation Services for Use in Occupational Programs at Postsecondary Institutions. Final Report.

    Science.gov (United States)

    Sharon, Amiel T.; And Others

    The purpose of this study was to obtain information that will make it possible to plan for the development of occupational competency assessment procedures in a rational manner, based on the expressed needs of occupational educators and employers. Eight fields were selected for scrutiny: Accounting, Agribusiness, Data Processing, Day Care,…

  15. Development of a Comprehensive and Interactive Tool to Inform State Violence and Injury Prevention Plans.

    Science.gov (United States)

    Wilson, Lauren; Deokar, Angela J; Zaesim, Araya; Thomas, Karen; Kresnow-Sedacca, Marcie-Jo

    The Center of Disease Control and Prevention's Core State Violence and Injury Prevention Program (Core SVIPP) provides an opportunity for states to engage with their partners to implement, evaluate, and disseminate strategies that lead to the reduction and prevention of injury and violence. Core SVIPP requires awardees to develop or update their state injury and violence plans. Currently, literature informing state planning efforts is limited, especially regarding materials related to injury and violence. Presumably, plans that are higher quality result in having a greater impact on preventing injury and violence, and literature to improve quality would benefit prevention programming. (1) To create a comprehensive injury-specific index to aid in the development and revision of state injury and violence prevention plans, and (2) to assess the reliability and utility of this index. Through an iterative development process, a workgroup of subject matter experts created the Violence and Injury Prevention: Comprehensive Index Tool (VIP:CIT). The tool was pilot tested on 3 state injury and violence prevention plans and assessed for initial usability. Following revisions to the tool (ie, a rubric was developed to further delineate consistent criteria for rating; items were added and clarified), the same state plans were reassessed to test interrater reliability and tool utility. For the second assessment, reliability of the VIP:CIT improved, indicating that the rubric was a useful addition. Qualitative feedback from states suggested that the tool significantly helped guide plan development and communicate about planning processes. The final VIP:CIT is a tool that can help increase plan quality, decrease the research-to-practice gap, and increase connectivity to emerging public health paradigms. The tool provides an example of tailoring guidance materials to reflect academic literature, and it can be easily adapted to other topic areas to promote quality of strategic plans

  16. Planning for transit-supportive development : a practitioner's guide. Section 4 : corridor planning and transit-supportive development.

    Science.gov (United States)

    2014-06-01

    Planning for Transit-Supportive Development: A Practitioners Guide is a toolkit of practical and innovative measures to help : Metropolitan Planning Organizations (MPOs), regional planners, transit agencies, and local government elected o...

  17. Planning for transit-supportive development : a practitioner's guide. Section 5 : local planning and transit-supportive development.

    Science.gov (United States)

    2014-06-01

    Planning for Transit-Supportive Development: A Practitioners Guide is a toolkit of practical and innovative measures to help : Metropolitan Planning Organizations (MPOs), regional planners, transit agencies, and local government elected o...

  18. Planning for transit-supportive development : a practitioner's guide. Section 2 : general transit-supportive development planning topics.

    Science.gov (United States)

    2014-06-01

    Planning for Transit-Supportive Development: A Practitioners Guide is a toolkit of practical and innovative measures to help : Metropolitan Planning Organizations (MPOs), regional planners, transit agencies, and local government elected o...

  19. Proposal for development of a system for planning radiotherapy of gliomas

    International Nuclear Information System (INIS)

    Caldeira, Alexandre D.

    2015-01-01

    In the last three years, discussions were held on several topics in Nuclear Medicine area, starting with the nuclear data processing, passing by deterministic and stochastic mathematical methods, and finalizing with computer simulations of the following phenomena: neutron transport, applied to boron neutron capture therapy, and neutron diffusion, to study growth of tumor cells. From a mathematical model applied to radiotherapy of gliomas available in literature, it is proposed a strategy for development of a computer system to assist the planning radiotherapy of gliomas. (author)

  20. Equal employment opportunity plan development guidance

    Energy Technology Data Exchange (ETDEWEB)

    None

    1978-09-01

    The purpose of this publication is to provide instructions for the development of EEO Plans for Fiscal Year 1979. It supplements the National EEO Plan for the Department of Energy issued in August 1978 (DOE/S-0002). The material included should be used immediately as guidance to develop, document, and implement subordinate echelon commitments to EEO. A schedule for the development and submission of EEO Plans is included. Most of the continuing requirements will be published at a later date as part of the directives system. Any comments or helpful suggestions concerned with the program outlined would be appreciated by the Office of Equal Opportunity.

  1. Balancing urban development and endangered species: The coachella valley habitat conservation plan

    Science.gov (United States)

    Beatley, Timothy

    1992-01-01

    Habitat conservation plans (HCPs) permitted under Section 10(A) of the federal Endangered Species Act, have been increasingly used to overcome conflicts between urban development and species conservation. This article profiles one such HCP, the Coachella Valley (CA) Fringe-Toed Lizard Habitat Conservation Plan. The second HCP officially approved by the US Fish and Wildlife Service, the Coachella Valley case is frequently cited as a model for resolving conservation and development conflicts. The article begins with a discussion of the use of HCPs, and then provides a detailed discussion of Coachella Valley experience, its history, specific provisions, and success to date. A final section examines whether Coachella Valley does in fact represent a positive model. It is argued that the HCP has been less than fully successful and leaves unresolved a series of fundamental ethical and policy questions concerning the protection of endangered species.

  2. Formacion de Formadores en Planeamiento y Administracion de la Education: Informe Final. Reunion Tecnica de la Red REPLAD, Campinas, Sao Paulo, Brasil, 9-13 de noviembre de 1987. (Educational Development of Professionals in Educational Planning and Administration: Final Report. Proceedings of the Meeting of the Major Project for Education (Sao Paulo, Brazil, November 9-13, 1987).

    Science.gov (United States)

    United Nations Educational, Scientific, and Cultural Organization, Santiago (Chile). Regional Office for Education in Latin America and the Caribbean.

    This final report provides a synthesis of conference presentations by representatives from institutions in 17 Latin American and the Caribbean nations. The material includes descriptions about institutions of higher education planning and developing of their respective schools of education, ministries of education, and national and regional…

  3. Development of a transportation planning tool

    International Nuclear Information System (INIS)

    Funkhouser, B.R.; Moyer, J.W.; Ballweg, E.L.

    1994-01-01

    This paper describes the application of simulation modeling and logistics techniques to the development of a planning tool for the Department of Energy (DOE). The focus of the Transportation Planning Model (TPM) tool is to aid DOE and Sandia analysts in the planning of future fleet sizes, driver and support personnel sizes, base site locations, and resource balancing among the base sites. The design approach is to develop a rapid modeling environment which will allow analysts to easily set up a shipment scenario and perform multiple ''what if'' evaluations. The TPM is being developed on personal computers using commercial off-the shelf (COTS) software tools under the WINDOWS reg-sign operating environment. Prototype development of the TPM has been completed

  4. Environmental development plan: magnetic fusion

    International Nuclear Information System (INIS)

    1979-09-01

    This Environmental Development Plan (EDP) identifies the planning and management requirements and schedules needed to evaluate and assess the environmental, health and safety (EH and S) aspects of the Magnetic Fusion Energy Program (MFE). Environment is defined to include the environmental, health (occupational and public), and safety aspects

  5. A report on developing a checklist to assess company plans focused on improving safety awareness, safe behaviour and safety culture: final report

    NARCIS (Netherlands)

    Steijger, N.; Starren, H.; Keus, M.; Gort, J.; Vervoort, M.

    2003-01-01

    This report describes the process of developing a checklist to asses company plans focused on improving safety awareness, safe behaviour and safety culture. These plans are part of a programme initiated by the Ministry of Social Affairs and Employment aiming at improving the safety performance of

  6. Horticulture Therapy Curriculum Development. Final Report.

    Science.gov (United States)

    Taylor, Sally; And Others

    This final report includes two major components: a narrative describing a project at Edmonds Community College, Washington, to develop a horticultural therapy curriculum and descriptions of six courses developed or revised during the project. The narrative reports the development of a supplementary interdisciplinary certification program to train…

  7. 7 CFR 22.306 - Financing rural development planning.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 1 2010-01-01 2010-01-01 false Financing rural development planning. 22.306 Section... Responsibilities of State Governments § 22.306 Financing rural development planning. States will be required to finance rural development planning through their own resources, revenue-sharing allocations, or the...

  8. Rural Transformation and Planning Tactics in the 13th Five-Year Plan Period

    Institute of Scientific and Technical Information of China (English)

    Luo; Xiaolong; Xu; Xiao; Li; Min

    2016-01-01

    Rural development has long been the focus of China’s central and local governments. Since the late 2000 s, rural areas have presented new transformation features and development trends. To stimulate rural transformation and development in the 13 th Five-Year Plan period, this paper reviews major ideas on rural development in related disciplines. This study also summarizes main rural transformation features, including the aging population, hollow villages, changes in the allocation of land resource, semi-urbanization, and regional differences in rural development. Finally, it also provides suggestions for planning tactics in the 13 th Five-Year Plan period, such as making differentiated rural development strategies, exploring new methods to stimulate rural stock land planning and use, and enforcing relevant policy and management reforms.

  9. Rural Transformation and Planning Tactics in the 13th Five-Year Plan Period

    Institute of Scientific and Technical Information of China (English)

    Luo Xiaolong; Xu Xiao; Li Min

    2016-01-01

    Rural development has long been the focus of China's central and local governments.Since the late 2000s,rural areas have presented new transformation features and development trends.To stimulate rural transformation and development in the 13th Five-Year Plan period,this paPer reviews major ideas on rural development in related disciplines.This study also summarizes main rural transformation features,including the aging population,hollow villages,changes in the allocation of land resource,semi-urbanization,and regional differences in rural development.Finally,it also provides suggestions for planning tactics in the 13th Five-Year Plan period,such as making differentiated rural development strategies,exploring new methods to stimulate rural stock land planning and use,and enforcing relevant policy and management reforms.

  10. Participatory development planning in Botswana: Exploring the ...

    African Journals Online (AJOL)

    the significance of public participation in planning is the ... to participatory planning, Botswana's planning system remains non-participatory. What is perceived as a ..... Administration. Despite the above, the. Tribal Administration remains important to the development planning efforts in Botswana. This could be attributed.

  11. A Project to Develop a Marketing Plan in Support of William Beaumont Army Medical Center, Fort Bliss, Texas

    Science.gov (United States)

    1989-12-01

    stressed by the Texas Hospital Association (1982), "the key to success in applying and understanding the marketing mix lies in the concept of rightness...alternatives 8. Develop the marketing mix 9. Select a strategy option Phase III (Finalization)’ 10. Design the tactics 11. Present the plan 12. Write the plan...usage incentive Marketing mix Product, price, distribution [place], marketing communication [promotion] Contingency strategies Marketing Budget (How Much

  12. Monte Carlo treatment planning with modulated electron radiotherapy: framework development and application

    Science.gov (United States)

    Alexander, Andrew William

    optimization algorithms are demonstrated. We investigated the clinical significance of MERT on spinal irradiation, breast boost irradiation, and a head and neck sarcoma cancer site using several parameters to analyze the treatment plans. Finally, we investigated the idea of mixed beam photon and electron treatment planning. Photon optimization treatment planning tools were included within the MERT planning toolkit for the purpose of mixed beam optimization. In conclusion, this thesis work has resulted in the development of an advanced framework for photon and electron Monte Carlo treatment planning studies and the development of an inverse planning system for photon, electron or mixed beam radiotherapy (MBRT). The justification and validation of this work is found within the results of the planning studies, which have demonstrated dosimetric advantages to using MERT or MBRT in comparison to clinical treatment alternatives.

  13. Information Communication Technology Planning in Developing Countries

    Science.gov (United States)

    Malapile, Sandy; Keengwe, Jared

    2014-01-01

    This article explores major issues related to Information Communication Technology (ICT) in education and technology planning. Using the diffusion of innovation theory, the authors examine technology planning opportunities and challenges in Developing countries (DCs), technology planning trends in schools, and existing technology planning models…

  14. Development and application of the methodology to establish life extension and modernization plan of aged hydropower plants

    International Nuclear Information System (INIS)

    Kim, Jong Sung; Kwon, Hyuck Cheon; Song, Byung Hun; Kwon, Chang Seop

    2009-01-01

    This paper provides how to establish an integrated plan for LE (Life Extension) and MD (MoDernization) of aged hydropower plants. The methodology is developed through review of overseas/domestic LE/MD histories, investigation of the previous overseas methodologies and consideration of domestic practices. The methodology includes reviews of the various factors such as condition, operation and maintenance history, up-to-date technology, and economic benefit. In order to establish the life extension/modernization plan, the methodology is applied to the domestic aged hydropower plants. Finally, priority rankings and draft practice plans for LE/MD are derived.

  15. Governance in regional development planning?

    DEFF Research Database (Denmark)

    Galland, Daniel

    2008-01-01

    The purpose of this paper is to lay part of the groundwork for a new project aimed at exploring governance aspects concerned with regional development planning (RDP) in Denmark. The fundamental objective is to help establish and clarify a number of research questions to delve into the conditions...... and opportunities for anchoring and implementing such RDP. The paper mainly adopts a descriptive approach to portray tentative pathways to explore and discuss regional governance structures, procedures and practices that are being developed in establishing new RDP processes, strategies and plans....

  16. The 2016-2018 National Plan of Management of Radioactive Materials and Wastes. Final report

    International Nuclear Information System (INIS)

    2017-01-01

    A first document contains the final version of the French National Plan of Management of Radioactive Materials and Wastes (PNGMDR) for the period 2016-2018: principles and objectives (presentation of radioactive materials and wastes, principles to be taken into account to define pathways of management of radioactive wastes, legal and institutional framework, information transparency), the management of radioactive materials (context and challenges, management pathways, works on fast breeder reactors of fourth generation), assessment and perspectives of existing pathways of management of radioactive wastes (management of historical situations, management of residues of mining and sterile processing, management of waste with a high natural radioactivity, management of very short life waste, of very low activity wastes, and low and medium activity wastes), needs and perspectives regarding management processes to be implemented for the different types of radioactive wastes. Appendices to this document contain: a recall of the content of previous PNGMDR since 2007, a synthesis of realisations and researches performed abroad, research orientations for the concerned period, and international agreement on spent fuel and radioactive waste management. A second document, released by the ASN, proposes an environmental and strategic assessment of the plan. A third one and a fourth one contain the opinion of the Environmental Authority on the plan preliminary focus and the answer to the Environmental Authority by the ASN. Finally, a synthesis of the remarks made by the public about the PNGMDR and the answers to these remarks conclude the document

  17. History of Planning Structure Development in Irkutsk

    Science.gov (United States)

    Kulakov, A. I.; Ree, A. U.

    2017-11-01

    The development of Irkutsk was spontaneous; the first streets represented a rather complex system of streets, dead ends, lanes. Throughout the history of the city, several general plans and development projects have been implemented (but not completely). Unlike other large Siberian cities (Novosibirsk, Krasnoyarsk), Irkutsk managed to preserve its historical appearance, architecture and initial planning. During its history the city has passed five stages of the planning structure development. The first stage of the city’s history coincides with the formation of the Russian settlements network in Eastern Siberia from the middle of the 17th to the end of the 18th centuries. Like many other Siberian cities, Irkutsk began its evolution from a fortified stockaded town. By the end of the 17th century a trading quarter appeared outside its walls. Currently, the city is developing and growing, so, a relevant issue of the further development direction of the Irkutsk planning structure naturally arises.

  18. SKB`s planning of the EIA in connection with the final disposal of nuclear waste

    Energy Technology Data Exchange (ETDEWEB)

    Thegerstroem, C.; Forsstroem, H. [Swedish Nuclear Fuel and Waste Management Co., Stockholm (Sweden)

    1995-12-01

    The plans for the final disposal of Swedish nuclear waste are summarized. The legal requirements on Environmental Impact Statements (EIS) and their role in the program for the final disposal of nuclear waste are described. SKB`s view of the purpose of the Environmental Impact Assessment is described in the light of the experience which now exists from the work on an encapsulation facility and a deep repository. In order to obtain an adequate basis for decision-making, the EIS is of central importance. In SKB`s view, with regard to the final disposal of nuclear waste in Sweden, there is a very good possibility of fulfilling the requirements on the EIS which should be made within modern environmental protection work. 8 refs, 5 figs.

  19. Scenario Based Network Infrastructure Planning

    DEFF Research Database (Denmark)

    Knudsen, Thomas Phillip; Pedersen, Jens Myrup; Madsen, Ole Brun

    2005-01-01

    The paper presents a method for IT infrastructure planning that take into account very long term developments in usages. The method creates a scenario for a final, time independent stage in the planning process. The method abstracts relevant modelling factors from available information...

  20. The planning of decommissioning activities within nuclear facilities - Generating a Baseline Decommissioning Plan

    International Nuclear Information System (INIS)

    Meek, N.C.; Ingram, S.; Page, J.

    2003-01-01

    BNFL Environmental Services has developed planning tools to meet the emerging need for nuclear liabilities management and decommissioning engineering both in the UK and globally. It can provide a comprehensive baseline planning service primarily aimed at nuclear power stations and nuclear plant. The paper develops the following issues: Decommissioning planning; The baseline decommissioning plan;The process; Work package; Compiling the information; Deliverables summary; Customer Benefits; - Planning tool for nuclear liability life-cycle management; - Robust and reliable plans based upon 'real' experience; - Advanced financial planning; - Ascertaining risk; - Strategy and business planning. The following Deliverables are mentioned:1. Site Work Breakdown Structure; 2. Development of site implementation strategy from the high level decommissioning strategy; 3. An end point definition for the site; 4. Buildings, operational systems and plant surveys; 5. A schedule of condition for the site; 6. Development of technical approach for decommissioning for each work package; 7. Cost estimate to WBS level 5 for each work package; 8. Estimate of decommissioning waste arisings for each work package; 9. Preparation of complete decommissioning programme in planning software to suit client; 10. Risk modelling of work package and overall project levels; 11. Roll up of costs into an overall cost model; 12. Cash flow, waste profiling and resource profiling against the decommissioning programme; 13. Preparation and issue of Final Report. Finally The BDP process is represented by a flowchart listing the following stages: [Power Station project assigned] → [Review project and conduct Characterisation review of power station] → [Identify work packages] → [Set up WBS to level 3] → [Assign work packages] → [Update WBS to level 4] →[Develop cost model] → [Develop logic network] → [Develop risk management procedure] ] → [Develop project strategy document]→ [Work package

  1. Integrating design and production planning with knowledge-based inspection planning system

    International Nuclear Information System (INIS)

    Abbasi, Ghaleb Y.; Ketan, Hussein S.; Adil, Mazen B.

    2005-01-01

    In this paper an intelligent environment to integrate design and inspection earlier to the design stage. A hybrid knowledge-based approach integrating computer-aided design (CAD) and computer-aided inspection planning (CAIP) was developed, thereafter called computer-aided design and inspection planning (CADIP). CADIP was adopted for automated dimensional inspection planning. Critical functional features were screened based on certain attributes for part features for inspection planning application. Testing the model resulted in minimizing the number of probing vectors associated with the most important features in the inspected prismatic part, significant reduction in inspection costs and release of human labor. In totality, this tends to increase customer satisfaction as a final goal of the developed system. (author)

  2. Developing standardized facility contingency plans

    International Nuclear Information System (INIS)

    Davidson, D.A.

    1993-01-01

    Texaco consists of several operating departments that are, in effect, independent companies. Each of these departments is responsible for complying with all environmental laws and regulations. This includes the preparation by each facility to respond to an oil spill at that location. For larger spills, however, management of the response will rest with corporate regional response teams. Personnel from all departments make up the regional teams. In 1990, Congress passed the Oil Pollution Act. In 1991, the US Coast Guard began developing oil spill response contingency plan regulations, which they are still working on. Meanwhile, four of the five west coast states have also passed laws requiring contingency plans. (Only Hawaii has chosen to wait and see what the federal regulations will entail). Three of the states have already adopted regulations. Given these laws and regulations, along with its corporate structure, Texaco addressed the need to standardize local facility plans as well as its response organization. This paper discusses how, by working together, the Texaco corporate international oil spill response staff and the Texaco western region on-scene commander developed: A standard contingency plan format crossing corporate boundaries and meeting federal and state requirements. A response organization applicable to any size facility or spill. A strategy to sell the standard contingency plan and response organization to the operating units

  3. Legal consequences of the special development plan 'power plant sites' on regional planning and on guidelines for building plans

    International Nuclear Information System (INIS)

    1978-01-01

    The Special Development Plan 'Power plant sites' was made compulsory by the regulation given by the Land government in Juli 1976. For extending the energy supply system this Special Development Plan intends to provide a sufficient amount of power plant sites suitably located with regard to present and future consumption centres and permitting a cooling by means of river water while safeguarding the interests of water resources policy. The Special Development Plan established in accordance with the articles 25 and 27 of the planning law of the Land lays down that 14 specified areas are to be kept free from utilization purposes which could be opposed to the realization of power plant projects. Thus the securing of these (potential) sites has become an objective of area planning and planning of the Land in the sense of article 5 paragraph 4 of the Federal law on area planning. (orig./HP) [de

  4. A methodology for developing strategic municipal solid waste management plans with an application in Greece.

    Science.gov (United States)

    Economopoulos, A P

    2010-11-01

    A rational approach for developing optimal municipal solid waste (MSW) management plans comprises the strategic and the detailed planning phases. The present paper focuses on the former, the objective of which is to screen management alternatives so as to select the ones that are able to fulfil all legal and other management requirements with reasonable cost. The analysis considers the transportation, treatment and final disposal of the commingled wastes that remain after the application of material recovery at the source programmes and comprises 10 elements, four of which are region-dependent and the remaining ones application-dependent. These elements and their inter-dependencies are described and the entire methodology is applied to Greece. The application considers the existing regional plans and shows that they are incompatible with the existing EU Directives, as well as overly expensive. To address this problem, a new plan is developed in accordance with the rational planning principles of the present methodology. The comparative evaluation of the above alternatives shows that the existing regional plans, in addition to being incompatible with the applicable EU Directives, require 4.3 to 4.8 times (3.7 to 4.4 billion €) higher capital investment and their annual cost is at least 2.1 to 2.3 times (590 to 735 million € year(-1)) higher in comparison with the new national plan.

  5. Settlement Networks in Polish Spatial Development Regional Plans

    Science.gov (United States)

    Sołtys, Jacek

    2017-10-01

    In 1999, ten years after the great political changes in Poland, 16 self-governed regions (in Polish: voivodeship) were created. According to Polish law, voivodeship spatial development plans, or regional plans in short, determine basic elements of the settlement network. No detailed regulations indicate the specific elements of the settlement network or what features of these elements should be determined. For this reason, centres as elements of the settlement network are variously named in different regions and take the form of various models. The purposes of the research described in this article are: (1) recognition and systematization of settlement network models determined in regional plans; and (2) assessment of the readability of determination in planning and its usefulness in the practice of regional policy. Six models of settlement networks in regional plans have been identified and classified into types and sub-types. Names of specific levels of centres indicate that they were classified according to two criteria: (1) level of services, which concerns only 5 voivodships; and (2) importance in development, which concerns the 11 other voivodships. The hierarchical model referring to the importance of development is less understandable than the one related to services. In the text of most plans, centres of services and centres of development are treated independently from their names. In some plans the functional types of towns and cities are indicated. In some voivodships, specifications in the plan text are too general and seem to be rather useless in the practice of regional policy. The author suggests that regional plans should determine two kinds of centres: hierarchical service centres and non-hierarchical centres of development. These centres should be further distinguished according to: (1) their role in the activation of surroundings; (2) their level of development and the necessity of action for their development; and (3) the types of actions

  6. Environmental Development Plan: uranium enrichment

    International Nuclear Information System (INIS)

    1979-09-01

    This Environmental Development Plan identifies and examines the environmental, health, safety, and socioeconomic concerns and corresponding requirements associated with the DOE research, development, demonstration, and operation of the Uranium Enrichment program, including the gaseous diffusion process, the centrifuge process, centrifuge rotor fabrication, and related research and development activities

  7. Development concept plan

    International Nuclear Information System (INIS)

    1992-06-01

    The following management objectives for New River Gorge National River relate to the Kaymoor site to: Preserve coal mining, railroad, and other historic resources that best illustrate park significance; Develop a system of land- and water-based recreation opportunities that allow visitors to experience the park's resources to the extent that natural, cultural, and scenic values are not imparied; and Work with the community to the extent possible to help it maximize economic benefits related to park development without impairing key resources. The Development Concept Plant outlining a plan of development for Kaymoor is a part of a larger emphasis by the National Park Service to identify and develop significant coal-related historic and cultural resources in southern West Virginia in cooperation with the West Virginia State Historic Preservation Office

  8. 75 FR 22737 - Final Damage Assessment and Restoration Plan for the Bayou Verdine and Calcasieu River

    Science.gov (United States)

    2010-04-30

    ..., and Liability Act (CERCLA), 42 U.S.C. 9607(f), Section 311 of the Federal Water Pollution and Control... DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration Final Damage Assessment and Restoration Plan for the Bayou Verdine and Calcasieu River AGENCY: National Oceanic and Atmospheric...

  9. Ensuring Sustainable Development through Urban Planning in Pakistan

    Directory of Open Access Journals (Sweden)

    Mohammad Qasim

    2013-04-01

    Full Text Available Urban planning includes land use management and environmental change. It makes arrangement for community facilities and services. Since, sustainable development has been included as a vital end product of all planning goals it also provides for balanced use of land, housing and transportation and better quality of life. Present urban planning in Pakistan is not ensuring sustainable development in Pakistan. This is tested through the case study of master planning in Rawalpindi and its implementation through housing schemes in Rawalpindi, Pakistan. Large portions of provisions of master plans are not implemented. This paper explains how the urban planning will be made enabled to ensure sustainable development in Pakistan. Six numbers of housing schemes and two squatter settlements have been surveyed through questionnaires, secondary data, the opinions of the experts from related fields and site observations. Amenities and social services at far distance, very less green area, Less quantity and bad quality of water, absence of comprehensive solid waste management and sewage disposal system and nontreatment of solid waste, effluent and sewage, prevalent unhygienic conditions and air and water pollution are the existing factors effecting the sustainability. There is a need to revisit the urban planning and a comprehensive Urban and Environment Planning Law at national level and at provincial level is recommended to enable the urban planning to ensure the sustainable development in Pakistan

  10. ISV technology development plan for buried waste

    International Nuclear Information System (INIS)

    Nickelson, D.F.; Callow, R.A.; Luey, J.K.

    1992-07-01

    This report identifies the main technical issues facing the in situ vitrification (ISV) application to buried waste, and presents a plan showing the top-level schedule and projected resources needed to develop and demonstrate the technology for meeting Environmental Restoration Department (ERD) needs. The plan also proposes a model strategy for the technology transfer from the Department of Energy's Office of Technology Development (DOE-OTD) to the Office of Environmental Restoration (DOE-ER) as the technology proceeds from issues resolution (development) to demonstration and remedial readiness. Implementation of the plan would require $34,91 1K in total funding to be spread in the years FY-93 through FY-98. Of this amount, $10,183K is planned to be funded by DOE-OTD through the ISV Integrated Program. The remaining amount, $24,728K, is recommended to be split between the Department of Energy (DOE) Office of Technology Development ($6,670K) and DOE Office of Environmental Restoration ($18,058K)

  11. Developing a disposal and remediation plan

    International Nuclear Information System (INIS)

    Messier, T.S.

    1999-01-01

    The environmental release of wastes generated by the upstream oil and gas industry in Alberta can result in polluted soil and groundwater at several facilities across the province. Responsibility for decommissioning upstream oil and gas facilities falls under the jurisdiction of the Alberta Energy and Utilities Board (EUB) and Alberta Environmental Protection (AEP). This paper outlines a protocol that can serve as a framework for the development of a plan to dispose of oilfield waste and to remediate related contaminated soils. The components involved in developing a disposal and remediation plan for oilfield wastes are: (1) identifying the potential source of pollution and oilfield waste generation, (2) characterizing oilfield wastes, (3) determining the nature and extent of soil and groundwater pollution, (4) preparing a remedial action plan, (5) assessing the viability of various remediation options, and (6) preparing health and safety plan. 12 refs., 2 tabs., 2 figs

  12. Energy planning in Spain

    International Nuclear Information System (INIS)

    Cortina Garcia, J.

    1995-01-01

    This report aims to describe energy planning in Spain. It briefly analyses the three completed national energy plans (Plan Energetico Nacional, PEN). The fourth PEN 1991-2000 is analysed in detail, by reference to its objectives and characteristics and to developments during its first five years in operation. The Ministry of Industry and Energy has updated PEN en 1995, almost halfway through its period, and this is also summarised. Finally, there are some reflections on the future of energy planning. (Author) 46 refs

  13. Minimum Value of Eligible Employer-Sponsored Plans and Other Rules Regarding the Health Insurance Premium Tax Credit. Final regulations.

    Science.gov (United States)

    2015-12-18

    This document contains final regulations on the health insurance premium tax credit enacted by the Patient Protection and Affordable Care Act and the Health Care and Education Reconciliation Act of 2010, as amended by the Medicare and Medicaid Extenders Act of 2010, the Comprehensive 1099 Taxpayer Protection and Repayment of Exchange Subsidy Overpayments Act of 2011, and the Department of Defense and Full-Year Continuing Appropriations Act, 2011. These final regulations affect individuals who enroll in qualified health plans through Affordable Insurance Exchanges (Exchanges, sometimes called Marketplaces) and claim the health insurance premium tax credit, and Exchanges that make qualified health plans available to individuals and employers.

  14. Research and development quality assurance planning

    Energy Technology Data Exchange (ETDEWEB)

    Hoke, P.B.

    1990-05-14

    Planning for quality assurance (QA) in research and development (R D) is like stealing eggs without waking up the chickens. The QA program should be as unobtrusive as possible. Researchers require a QA program that affords them an environment capable of supporting repeatable experiments with accurate data without unduly stifling their creative abilities. Careful advance planning ensures that the intensity of control provided by quality-related systems is commensurate with the importance and scope of the activities being performed. Good scientific practices applied to small bench-scale projects may require minimal additional controls. As projects increase in size and complexity the controls imposed through planning must, by necessity, be increased. Research and development QA planning, just like any other planning, involves all affected individuals. The application of control systems is determined by factors such as customer or sponsor requirements, the importance of an item or activity to the experiment's success, and the organizational complexity of the project. Many larger experiments are highly dependent on quality-related support activities such as calibration, engineering design, and inspection provided by organizations outside the R D group. Since, in most cases, the expense of support activities is taken directly from funds available for research, it is important for the researchers to be involved in the planning efforts to help determine and agree with the level of QA effort required. A single plan will often suffice for organizations engaged in large numbers of similar experiments. Complex experiments may require unique QA plans or additions to existing plans. Once implemented, the R D QA plans, like any others, require audits or surveillances and may require revisions if the scope of the experiment changes. 1 ref., 1 fig.

  15. Research and development quality assurance planning

    International Nuclear Information System (INIS)

    Hoke, P.B.

    1990-01-01

    Planning for quality assurance (QA) in research and development (R ampersand D) is like stealing eggs without waking up the chickens. The QA program should be as unobtrusive as possible. Researchers require a QA program that affords them an environment capable of supporting repeatable experiments with accurate data without unduly stifling their creative abilities. Careful advance planning ensures that the intensity of control provided by quality-related systems is commensurate with the importance and scope of the activities being performed. Good scientific practices applied to small bench-scale projects may require minimal additional controls. As projects increase in size and complexity the controls imposed through planning must, by necessity, be increased. Research and development QA planning, just like any other planning, involves all affected individuals. The application of control systems is determined by factors such as customer or sponsor requirements, the importance of an item or activity to the experiment's success, and the organizational complexity of the project. Many larger experiments are highly dependent on quality-related support activities such as calibration, engineering design, and inspection provided by organizations outside the R ampersand D group. Since, in most cases, the expense of support activities is taken directly from funds available for research, it is important for the researchers to be involved in the planning efforts to help determine and agree with the level of QA effort required. A single plan will often suffice for organizations engaged in large numbers of similar experiments. Complex experiments may require unique QA plans or additions to existing plans. Once implemented, the R ampersand D QA plans, like any others, require audits or surveillances and may require revisions if the scope of the experiment changes. 1 ref., 1 fig

  16. California Air Quality State Implementation Plans; Final Approval; Butte County Air Quality Management District; Stationary Source Permits

    Science.gov (United States)

    EPA is taking final action to approve a revision to the Butte County Air Quality Management District (BCAQMD) portion of the California State Implementation Plan (SIP). This revision concerns the District's New Source Review (NSR) permitting program.

  17. Economic planning and social justice in developing countries

    Energy Technology Data Exchange (ETDEWEB)

    Mehmet, O

    1978-01-01

    This book argues that development in LDCs (Less Developed Countries) cannot proceed in a sequential path - with income growth first and distribution after. Instead, egalitarian development, based on a combination of efficiency and equity criteria in the planning process, would emphasize employment creation, human resources, and rural and agricultural development, rather than urban-based industrial growth relying on imported capital-intensive technology. This, complemented with reforms in the political system, would be more in accord with the social needs and realities of LDCs. In particular, decentralized economic planning, responsive to the needs of rural communities, would offer an effective nonviolent revolutionary alternative. It is argued that egalitarian development is not only dependent on domestic reforms in LDCs, but also on a restructuring of international trade, aid and monetary systems for a more-equitable global distribution of income and wealth between nations. The book is divided into three parts: (1) devoted to a critical review of postwar growth and planning strategies; (2) based upon five case studies of Malaysia, Liberia, Pakistan, Brazil and Uganda, examines the influence of elites on economic planning and policy; and (3) offers elements of an egalitarian development planning. The book concludes with a brief summary on egalitarian planning as a non-violent revolution.

  18. Sustainable development in city districts: BaLaLuZ project. Final report phase 2. BaBeL Lucerne; Nachhaltige Quartierentwicklung BaLaLuZh. Schlussbericht Phase 2. Quartier BaBeL

    Energy Technology Data Exchange (ETDEWEB)

    Wandeler, M.; Inderbitzin, J. [Babel, Lucerne (Switzerland); Geissbuehler, D. [Hochschule fuer Technik und Architektur (HTA) Luzern, Horw (Switzerland)

    2006-07-01

    This final report for the Swiss Federal Office of Energy (SFOE) is one of a series of reports concerning municipal development in various cities in Switzerland. The four city districts involved include Basel (Gundeldinger Feld), Lausanne (Bellevaux), Lucerne (Basel-/Bernstrasse) and Zurich (Werdwies). This final report summarises the results of the second phase of the project concerning the Baselstrasse and Bernstrasse districts in Lucerne. Alongside the planned work, a planning instrument that aids co-ordination and know-how-transfer was developed in this second phase. This master plan and the organisational structure for 2006 is described. Application work to be done from 2007 onwards is looked at. The main part of this report consists of eight annexes that define and describe building blocks for measures to be taken, the master plan, a plan of action 2007 - 2009, along with organisational and financial data.

  19. 76 FR 29259 - Swan Lake National Wildlife Refuge, Chariton County, MO; Final Comprehensive Conservation Plan...

    Science.gov (United States)

    2011-05-20

    ...We, the U.S. Fish and Wildlife Service (Service), announce the availability of the Final Comprehensive Conservation Plan (CCP) and Finding of No Significant Impact (FONSI) for the Environmental Assessment (EA) for Swan Lake National Wildlife Refuge (NWR). Goals and objectives in the CCP describe how the agency intends to manage the refuge over the next 15 years.

  20. The Implications of American Mathematics Graduates’ Career Development on the Career Planning of Chinese Mathematics Graduates

    Directory of Open Access Journals (Sweden)

    Zhang Shuntao

    2015-01-01

    Full Text Available This article starts with an careful analysis of the factors that cause Chinese mathematics graduate’s heavy pressure in job hunting and career development, followed by a detailed introduction of American mathematics graduates’ positive employment potential and their benign career development prospect. Finally the author puts forward that mathematics majors should plan their curriculum study in relation to their future career development, with the help of systematic, professional career development consultancy and guidance. Suggestions on how to improve mathematics majors employment competitiveness are also provided in this article.

  1. International benchmark and best practices on national infrastructure plans. Application to Spanish strategic planning

    Energy Technology Data Exchange (ETDEWEB)

    Pino Hernandez, E.M.; Delgado Quiralte, C.

    2016-07-01

    The need for planning regarding investment in infrastructures is recognised and supported by most governments around the world. Planning helps to take effective and correct decisions, provides a basis for monitoring its impacts and also facilitates further developments. However it requires a high level of organization, coordination among stakeholders and anticipation of transport needs. There are some different methodological approaches for strategic planning. This paper examines the importance of infrastructure planning and how it is undertaken in different countries from Europe and other continents. It is based on a benchmarking about planning procedures of 7 reference countries (UK, France, the Netherlands, Poland, Germany, Japan and USA), in addition to others whose strategic plans are being developed at the present moment such as Croatia or Romania. This benchmarking aims to extract and compare best practices carried out in this field and to define the optimal formulation of strategic planning. In this regard, the benchmarking is focused on some key aspects: firstly, on the plan structure and its main contents. There are a lot of differences about how each country defines the future needs for transport and how it establishes the objectives and the strategies to be followed. Secondly, on the characterisation of the authorities which are responsible of the plan development (level of dependence from the government, know-how…) along with the time frame and final validity of the plans. And finally, the level of detail of the proposed actions and budgetary commitments provided by the strategic plans. Throughout the comparative analysis, the knowledge generated by this benchmarking has allowed setting a series of specific recommendations in strategic planning which can be applied as innovative solutions and best practices in future planning processes in Spain. (Author)

  2. Development of a central final repository management for the coordination of the waste for Schacht Konrad from public authorities; Aufbau des zentralen Endlagerungsmanagements fuer die Koordination der Konrad-Abfaelle aus der oeffentlichen Hand

    Energy Technology Data Exchange (ETDEWEB)

    Graffunder, Iris; Dominke-Bendix, Carola; Waldek, Achim [Energiewerke Nord GmbH (EWN), Eggenstein-Leopoldshafen (Germany). Betriebsstaette Karlsruhe; Wunn, Christoph [admoVa Consulting GmbH, Bad Camberg (Germany)

    2012-11-01

    The central final repository management is supposed to fulfill the following tasks: active collaboration of Konrad contract draft, signing of internal contracts and agreements, cooperation contract with GNS, cooperation with coordination authorities, inventory taking of wastes (existing inventory and prognosis) and interim storage capacities of public authorities, development of planning and management software, optimization of the final repository documentation, container management, logistics concept, long-term disposal planning and prognosis, planning and coordination of the annual waste amount, management and documentation of disposed waste allocation, coordination of transport schedules, consulting service for waste obligations (final repository requirements, product control, documentation).

  3. Combinations of options: Methodology for impact analysis. Development plan 1993

    International Nuclear Information System (INIS)

    1992-01-01

    The orientations favored by Hydro-Quebec in terms of electricity supply and demand are based on a few key selection criteria. These criteria, as described in its development plan, pertain to economic benefit for the utility and its customers, compatibility with sustainable development, minimization of costs to customers, preservation of the utility's financial health, generation of economic spinoffs, and ease of adaptation. Impacts are calculated to illustrate the selection criteria. The main methods, assumptions, and components used in evaluating the various impacts are described. The discounted overall cost for Hydro-Quebec and all of its customers, means of meeting electricity requirements, and the economic benefit for Hydro-Quebec of the various market development options are discussed. The indicators chosen for environmental impact assessment are set forth and the method used to calculate long-term supply costs is presented, along with the methods for calculating economic spinoffs. Finally, the concepts of energy mix and energy self-sufficiency are outlined. 1 tab

  4. Airport Capital Improvement Planning: Stewardship for Airport Development

    Science.gov (United States)

    1997-09-01

    "Airport Capital Improvement Planning: Stewardship for Airport Development", was : originally written in October, 1995. It documented an effort to implement the : concept of capital improvement planning with the airport development industry. : Airpor...

  5. Radiation Planning Assistant - A Streamlined, Fully Automated Radiotherapy Treatment Planning System

    Science.gov (United States)

    Court, Laurence E.; Kisling, Kelly; McCarroll, Rachel; Zhang, Lifei; Yang, Jinzhong; Simonds, Hannah; du Toit, Monique; Trauernicht, Chris; Burger, Hester; Parkes, Jeannette; Mejia, Mike; Bojador, Maureen; Balter, Peter; Branco, Daniela; Steinmann, Angela; Baltz, Garrett; Gay, Skylar; Anderson, Brian; Cardenas, Carlos; Jhingran, Anuja; Shaitelman, Simona; Bogler, Oliver; Schmeller, Kathleen; Followill, David; Howell, Rebecca; Nelson, Christopher; Peterson, Christine; Beadle, Beth

    2018-01-01

    The Radiation Planning Assistant (RPA) is a system developed for the fully automated creation of radiotherapy treatment plans, including volume-modulated arc therapy (VMAT) plans for patients with head/neck cancer and 4-field box plans for patients with cervical cancer. It is a combination of specially developed in-house software that uses an application programming interface to communicate with a commercial radiotherapy treatment planning system. It also interfaces with a commercial secondary dose verification software. The necessary inputs to the system are a Treatment Plan Order, approved by the radiation oncologist, and a simulation computed tomography (CT) image, approved by the radiographer. The RPA then generates a complete radiotherapy treatment plan. For the cervical cancer treatment plans, no additional user intervention is necessary until the plan is complete. For head/neck treatment plans, after the normal tissue and some of the target structures are automatically delineated on the CT image, the radiation oncologist must review the contours, making edits if necessary. They also delineate the gross tumor volume. The RPA then completes the treatment planning process, creating a VMAT plan. Finally, the completed plan must be reviewed by qualified clinical staff. PMID:29708544

  6. Instrumentation and Control Life Cycle Management Plan Methodology. Volume 1, Manual: Final report

    International Nuclear Information System (INIS)

    Quick, D.S.; Murray, S.; Florio, F.; Bliss, M.J.

    1995-08-01

    This methodology manual describes how to develop a Life Cycle Management Plan (LCMP). An LCMP is a long-term strategic plan that can be developed for a nuclear power plant to cost-effectively maintain and upgrade its aging or obsolete Instrumentation and Control (I ampersand C) systems. An LCMP defines the utility's mission and objectives in regards to long range I ampersand C planning, as well as the plant's present configuration (I ampersand C systems, networks, man machine interfaces, etc.), its desired future I ampersand C systems, a long term I ampersand C maintenance strategy, and initial upgrade priorities and schedules to cost-effectively implement system upgrades. This manual is accompanied by a workbook (EPRI TR-105555-V2) which contains various worksheets, outlines, and generic interview questions that aid in the LCNW development process

  7. Smart city planning and development shortcomings

    Directory of Open Access Journals (Sweden)

    Margarita Angelidou

    2017-04-01

    Full Text Available This paper explores smart city planning and development shortcomings. In particular, it investigates eleven cases of smart city strategies and the shortcomings that were observed during their planning and implementation stages. The cases include: Barcelona Smart City, PlanlT Valley, Stockholm Smart City, Cyberjaya, King Abdullah Economic City, Masdar City, Skolkovo, Songdo International Business District, Chicago Smart City, Rio de Janeiro Smart City, and Konza Technology City. The paper proceeds with the synthesis of the findings and their critical appraisal. Shortcomings are classified into economic and budget shortages, bureaucratic and organizational challenges, challenges in the development and layout of digital services, poor physical planning, struggle to attract investment and support the development of new businesses, low performance in attracting and engaging users, and stakeholder resistance. In turn, the shortcomings are clustered in two distinct groups and analyzed in terms of causes and effects. The paper closes with mitigation propositions, accounting for past experience and novel approaches to this end.

  8. Integrated sustainable development and energy resource planning

    OpenAIRE

    Virgiliu NICULA

    2011-01-01

    Integrated sustainable development of a country cannot be conceived and begun without considering in an intricate tandem environmental protection and economic development. No one can exist without a natural material support of the life he or she enjoys. All economic development plans must include environmental and human civilization’s protection implicitly. Integrated resource planning must be done in an absolutely judicious manner, so we can all leave as a legacy for future generations both ...

  9. The development of an adolescent smoking cessation intervention--an Intervention Mapping approach to planning.

    Science.gov (United States)

    Dalum, Peter; Schaalma, Herman; Kok, Gerjo

    2012-02-01

    The objective of this project was to develop a theory- and evidence-based adolescent smoking cessation intervention using both new and existing materials. We used the Intervention Mapping framework for planning health promotion programmes. Based on a needs assessment, we identified important and changeable determinants of cessation behaviour, specified change objectives for the intervention programme, selected theoretical change methods for accomplishing intervention objectives and finally operationalized change methods into practical intervention strategies. We found that guided practice, modelling, self-monitoring, coping planning, consciousness raising, dramatic relief and decisional balance were suitable methods for adolescent smoking cessation. We selected behavioural journalism, guided practice and Motivational Interviewing as strategies in our intervention. Intervention Mapping helped us to develop as systematic adolescent smoking cessation intervention with a clear link between behavioural goals, theoretical methods, practical strategies and materials and with a strong focus on implementation and recruitment. This paper does not present evaluation data.

  10. Hydrothermal industrialization: direct heat development. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1982-05-01

    A description of hydrothermal resources suitable for direct applications, their associated temperatures, geographic distribution and developable capacity are given. An overview of the hydrothermal direct-heat development infrastructure is presented. Development activity is highlighted by examining known and planned geothermal direct-use applications. Underlying assumptions and results for three studies conducted to determine direct-use market penetration of geothermal energy are discussed.

  11. Distance Learning Plan Development: Initiating Organizational Structures

    National Research Council Canada - National Science Library

    Poole, Clifton

    1998-01-01

    .... Army distance learning plan managers to examine the DLPs they were directing. The analysis showed that neither army nor civilian distance learning plan managers used formalized requirements for organizational structure development (OSD...

  12. Quality assurance plan for Final Waste Forms project in support of the development, demonstration, testing and evaluation efforts associated with the Oak Ridge reservation's LDR/FFCA compliance

    International Nuclear Information System (INIS)

    Gilliam, T.M.; Mattus, C.H.

    1994-07-01

    This quality assurance project plan specifies the data quality objectives for Phase I of the Final Waste Forms Project and defines specific measurements and processes required to achieve those objectives. Although the project is funded by the U.S. Department of Energy (DOE), the ultimate recipient of the results is the U.S. Environmental Protection Agency (EPA). Consequently, relevant quality assurance requirements from both organizations must be met. DOE emphasizes administrative structure to ensure quality; EPA's primary focus is the reproducibility of the generated data. The ten criteria of DOE Order 5700.6C are addressed in sections of this report, while the format used is that prescribed by EPA for quality assurance project plans

  13. ENTERPRISE RESOURCE STRATEGIC PLANNING: TARGET CHOICE TECHNIQUES

    Directory of Open Access Journals (Sweden)

    A. S. Lankin

    2011-01-01

    Full Text Available Choice of the targets is one of most important elements of the resource planning system. Particular feature of the strategic planning is development of future alternatives for the enterprise. Main resource strategic planning cycle elements: examination of principal external and internal environment components; forming the company mission; development of long-term targets; concretization of the long-term targets through short-term aims; examination of strategies and final choice.

  14. Facility planning and site development

    International Nuclear Information System (INIS)

    Reisman, R.C.; Handmaker, H.

    1986-01-01

    Planning for a magnetic resonance imaging (MRI) facility should provide for the efficient operation of current and future MRI devices and must also take into consideration a broad range of general planning principles. Control of budgeted facility costs and construction schedules is of increasing importance due to the magnitude of expense of MRI facility development as well as the need to protect institutional or entrepreneurial investment. In a competitive environment facility costs may be the determining factor in a project's success

  15. South Dakota ITS/CVO business plan : final business plan

    Science.gov (United States)

    1998-01-18

    This report defines an Intelligent Transportation Systems/Commercial Vehicle Operations (ITS/CVO) program for the State of South Dakota. Structured as a business plan, the document includes the following components: 1) description of the current CVO ...

  16. Master plan study - District heating Kohtla-Jaerve and Johvi municipalities. Estonia. Final report. Appendices for chapter 9

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    The appendices to chapter nine of the final report of the master plan study on district heating in the municipalities of Kohtla-Jarve and Johvi municipalities (Estonia) present extensive data relating to economic, financial and environmental calculations, fuel consumption, energy balance and prices. (ARW)

  17. A Plan for the Development of Fusion Energy. Final Report to Fusion Energy Sciences Advisory Committee, Fusion Development Path Panel

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2003-03-05

    This report presents a plan for the deployment of a fusion demonstration power plant within 35 years, leading to commercial application of fusion energy by mid-century. The plan is derived from the necessary features of a demonstration fusion power plant and from the time scale defined by President Bush. It identifies critical milestones, key decision points, needed major facilities and required budgets.

  18. Fuel Fabrication Capability Research and Development Plan

    Energy Technology Data Exchange (ETDEWEB)

    Senor, David J.; Burkes, Douglas

    2014-04-17

    The purpose of this document is to provide a comprehensive review of the mission of the Fuel Fabrication Capability (FFC) within the Global Threat Reduction Initiative Convert Program, along with research and development (R&D) needs that have been identified as necessary to ensuring mission success. The design and fabrication of successful nuclear fuels must be closely linked endeavors. Therefore, the overriding motivation behind the FFC R&D program described in this plan is to foster closer integration between fuel design and fabrication to reduce programmatic risk. These motivating factors are all interrelated, and progress addressing one will aid understanding of the others. The FFC R&D needs fall into two principal categories, 1) baseline process optimization, to refine the existing fabrication technologies, and 2) manufacturing process alternatives, to evaluate new fabrication technologies that could provide improvements in quality, repeatability, material utilization, or cost. The FFC R&D Plan examines efforts currently under way in regard to coupon, foil, plate, and fuel element manufacturing, and provides recommendations for a number of R&D topics that are of high priority but not currently funded (i.e., knowledge gaps). The plan ties all FFC R&D efforts into a unified vision that supports the overall Convert Program schedule in general, and the fabrication schedule leading up to the MP-1 and FSP-1 irradiation experiments specifically. The fabrication technology decision gates and down-selection logic and schedules are tied to the schedule for fabricating the MP-1 fuel plates, which will provide the necessary data to make a final fuel fabrication process down-selection. Because of the short turnaround between MP-1 and the follow-on FSP-1 and MP-2 experiments, the suite of specimen types that will be available for MP-1 will be the same as those available for FSP-1 and MP-2. Therefore, the only opportunity to explore parameter space and alternative processing

  19. TVET Planning and Development

    NARCIS (Netherlands)

    Dr. J. Onstenk

    2014-01-01

    There are changes in society and labour market demands made to TVET and in the TVET system itself. To deal with both types of challenges, the aim for TVET planning and development is to anticipate how employment will evolve and to determine how to give individuals a knowledge base that will enable

  20. Developing a planning tool for South African prosecution resources: challenges and approach

    Directory of Open Access Journals (Sweden)

    R Koen

    2012-12-01

    Full Text Available In every country the prosecution of criminal cases is governed by different laws, policies and processes. In South Africa, the National Prosecuting Authority (NPA has the responsibility of planning and managing all prosecution functions. The NPA has certain unique characteristics that make it different from other similar organisations internationally. The development of a planning tool that the NPA could use to plan their future resource requirements over the short to medium term required extensive modelling, and its final form included features which, to the best knowledge of the development team, make it unique both locally and internationally. Model design was largely influenced by the challenges emanating from the special requirements and context of the problem. Resources were not forecasted directly, but were derived with the help of simulation models that traced docket flows through various resource-driven processes. Docket flows were derived as a proportion of reported crimes, and these were forecasted using a multivariate statistical model which could take into account explanatory variables as well as the correlations between the patterns observed within different crime categories. The simulation consisted of a number of smaller models which could be run independently, and not of one overarching model. This approach was found to make the best use of available data, and compensated for the fact that certain parameters, linking different courts and court types, were not available. In addition, it simplified scenario testing and sensitivity analysis. The various components of the planning tool, including inputs and outputs of the simulation models and the linkages between the forecasts and the simulation models, were implemented in a set of spreadsheets. By using spreadsheets as a common user interface, the planning tool could be used by prosecutors and managers who may not have extensive mathematical or modelling experience.

  1. Regional Development Planning in the Slovak Republic

    Science.gov (United States)

    Rentková, Katarína

    2017-10-01

    Regional development is very closely related to a region and its competitive advantages which affect the competitiveness of the region. The regional development is influenced by many factors that act differently depending on the region. To ensure the effective and harmonized regional development, the systematic approach is needed. Every region is unique and differs from the other by the level of economic development, living standards of its inhabitants, unemployment rate and by employment possibilities. Regional policy is a strategic investment policy which focuses on all regions and cities in the European Union. The aim is to boost economic growth and to improve the quality of people’s lives. Solidarity is the main feature of the policy, because policy focuses on support for less developed regions. A fundamental aspect of regional development is to reduce disparities between the regions and cities. The paper focuses on the analysis of regional development of Slovakia. The intention is to follow the logical continuity of the article’s parts, the correctness and the adequacy of information and data. First part is focused on the definition of the regional policy and regional development. Important task is to identify the differences between European policies - regional, structural and cohesion policy. This section is prepared by using the analytical methods - the analysis, the casual and historical analysis. This part is based on literature review. The empirical part is based on statistics and secondary analysis which were aimed to analyse the regional development and effectiveness of its planning in the Slovak Republic. The question of this article is whether it is possible to plan the regional development by application of the plan for economic and social development, called the Municipal Development Plan.

  2. A ten-step process to develop case management plans.

    Science.gov (United States)

    Tahan, Hussein A

    2002-01-01

    The use of case management plans has contained cost and improved quality of care successfully. However, the process of developing these plans remains a great challenge for healthcare executives, in this article, the author presents the answer to this challenge by discussing a 10-step formal process that administrators of patient care services and case managers can adapt to their institutions. It also can be used by interdisciplinary team members as a practical guide to develop a specific case management plan. This process is applicable to any care setting (acute, ambulatory, long term, and home care), diagnosis, or procedure. It is particularly important for those organizations that currently do not have a deliberate and systematic process to develop case management plans and are struggling with how to improve the efficiency and productivity of interdisciplinary teams charged with developing case management plans.

  3. Serving our communities better. Guidelines for planning and developing integrated delivery networks.

    Science.gov (United States)

    Prybil, L; Golden, P; Ballance, X

    1995-04-01

    In 1994 the Daughters of Charity National Health System-East Central (DCNHS-East Central) adopted 11 guidelines to help corporate staff and local leaders plan and develop integrated networks. Guideline 1 emphasizes needs-based strategic planning. Guideline 2 focuses on the community-based network planning process, recommending a team approach and ongoing communication with the local ordinary. In guidelines 3 through 5, the DCNHS-East Central Board of Directors spells out key issues that must be covered in proposals ultimately presented for governance action. Guideline 6 presents three core elements that should characterize all CBNs in which DCNHS-East Central institutions participate. Guideline 7 emphasizes that all CBN proposals and agreements must be clear with respect to the Catholic identity of DCNHS-East Central institutions. Guidelines 8 and 9 require that proposed changes to traditional policies and management practices be explicit in CBN proposals. The tenth guideline requires that all CBN proposals indicate an explicit evaluation function. The final guideline underscores that regardless of the strategic fit or how well a CBN is designed, it is unlikely to succeed unless both internal and external relationships are based on a solid foundation of honesty, mutual respect, and trust.

  4. Achievement Motivation Development Project. Final Report.

    Science.gov (United States)

    McClelland, Dave C.; Alschuler, Alfred S.

    Two efforts were made to develop achievement motivation in school children and to observe the effect of such training on their behavior in and out of school. These studies were undertaken because: (1) Achievement motivation might help children think more seriously about their work habits and career planning; (2) It might improve the grades of…

  5. Idaho Chemical Processing Plant spent fuel and waste management technology development program plan: 1994 Update

    International Nuclear Information System (INIS)

    1994-09-01

    The Department of Energy has received spent nuclear fuel (SNF) at the Idaho Chemical Processing Plant (ICPP) for interim storage since 1951 and reprocessing since 1953. Until April 1992, the major activity of the ICPP was the reprocessing of SNF to recover fissile uranium and the management of the resulting high-level wastes (HLW). In 1992, DOE chose to discontinue reprocessing SNF for uranium recovery and shifted its focus toward the continued safe management and disposition of SNF and radioactive wastes accumulated through reprocessing activities. Currently, 1.8 million gallons of radioactive liquid wastes (1.5 million gallons of radioactive sodium-bearing liquid wastes and 0.3 million gallons of high-level liquid waste), 3,800 cubic meters of calcine waste, and 289 metric tons heavy metal of SNF are in inventory at the ICPP. Disposal of SNF and high-level waste (HLW) is planned for a repository. Preparation of SNF, HLW, and other radioactive wastes for disposal may include mechanical, physical, and/or chemical processes. This plan outlines the program strategy of the ICPP spent Fuel and Waste Management Technology Development Program (SF ampersand WMTDP) to develop and demonstrate the technology required to ensure that SNF and radioactive waste will be properly stored and prepared for final disposal in accordance with regulatory drivers. This Plan presents a brief summary of each of the major elements of the SF ampersand WMTDP; identifies key program assumptions and their bases; and outlines the key activities and decisions that must be completed to identify, develop, demonstrate, and implement a process(es) that will properly prepare the SNF and radioactive wastes stored at the ICPP for safe and efficient interim storage and final disposal

  6. 44 CFR 78.5 - Flood Mitigation Plan development.

    Science.gov (United States)

    2010-10-01

    ... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Flood Mitigation Plan..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78.5 Flood Mitigation Plan development. A Flood Mitigation Plan will articulate a...

  7. Activities related to site characterization in ENRESA's research and development plan

    International Nuclear Information System (INIS)

    Olmo, C. del; Astudillo, J.; Bajos, C.; Hernan, P.

    1995-01-01

    Following a short introduction that summarizes the global strategy for high-level waste (HLW) disposal, an outline is given of the El Berrocal Project, with an emphasis on site characterization is given. The article focuses special attention on the technological developments achieved over the last few years within the framework of the ENRESA R and D Plans, both in global terms and within the El Berrocal project in particular, regarding the conception and construction of mobile hydrogeological and hydrogeochemical characterization units and the performance of tracer tests. These developments will make it possible to undertake, with slight modification and enhancements, the work required in the search for sites suitable for the definitive disposal of high-level radioactive wastes. A final section is devoted to presenting an overview of anticipated R and D actions for the five-year period 1995--1999

  8. Nuclear fuels technologies fiscal year 1998 research and development test plan

    International Nuclear Information System (INIS)

    Alberstein, D.; Blair, H.T.; Buksa, J.J.

    1998-06-01

    A number of research and development (R and D) activities are planned at Los Alamos National Laboratory (LANL) in FY98 in support of the Department of Energy Office of Fissile Materials Disposition (DOE-MD). During the past few years, the ability to fabricate mixed oxide (MOX) nuclear fuel using surplus-weapons plutonium has been researched, and various experiments have been performed. This research effort will be continued in FY98 to support further development of the technology required for MOX fuel fabrication for reactor-based plutonium disposition. R and D activities for FY98 have been divided into four major areas: (1) feed qualification/supply, (2) fuel fabrication development, (3) analytical methods development, and (4) gallium removal. Feed qualification and supply activities encompass those associated with the production of both PuO 2 and UO 2 feed materials. Fuel fabrication development efforts include studies with a new UO 2 feed material, alternate sources of PuO 2 , and determining the effects of gallium on the sintering process. The intent of analytical methods development is to upgrade and improve several analytical measurement techniques in support of other R and D and test fuel fabrication tasks. Finally, the purpose of the gallium removal system activity is to develop and integrate a gallium removal system into the Pit Disassembly and Conversion Facility (PDCF) design and the Phase 2 Advanced Recovery and Integrated Extraction System (ARIES) demonstration line. These four activities will be coordinated and integrated appropriately so that they benefit the Fissile Materials Disposition Program. This plan describes the activities that will occur in FY98 and presents the schedule and milestones for these activities

  9. Tools for Supporting Distributed Agile Project Planning

    Science.gov (United States)

    Wang, Xin; Maurer, Frank; Morgan, Robert; Oliveira, Josyleuda

    Agile project planning plays an important part in agile software development. In distributed settings, project planning is severely impacted by the lack of face-to-face communication and the inability to share paper index cards amongst all meeting participants. To address these issues, several distributed agile planning tools were developed. The tools vary in features, functions and running platforms. In this chapter, we first summarize the requirements for distributed agile planning. Then we give an overview on existing agile planning tools. We also evaluate existing tools based on tool requirements. Finally, we present some practical advices for both designers and users of distributed agile planning tools.

  10. Naval Medical Research and Development Strategic Plan

    Science.gov (United States)

    2008-03-01

    the strategic planning program for action. The pros and cons of the current NMR&D organization structure, management support funding, and officer...Distribution List D-4 Naval Medical Research and Development Strategic Plan March 2008 SWE Naval Surface Warfare Enterprise SWOT Strengths

  11. Development of competences from the viewpoint of career planning

    OpenAIRE

    Adomaitienė, Jūratė; Zubrickienė, Ilona

    2011-01-01

    The paper attempts to reveal the essence of the process of career perspective planning, highlight the aspect of dynamism of modern career competence by showing the importance of its continuous development and the significance for career perspective planning. The analysis reveals the approach of teachers and lecturers towards own career competence, its development and importance for planning of own career perspective; towards reflection as the basic quality of own career development, while pla...

  12. Strategic planning for sustainable spatial, landscape and tourism development in Serbia

    Directory of Open Access Journals (Sweden)

    Maksin Marija

    2010-01-01

    Full Text Available The paper presents an overview of the expected role of spatial and environmental planning in coordination and integration with strategic planning for sustainable spatial/territorial, landscape and tourism development. The application of an integrated approach to sustainable territorial development planning and management in the European Union is also analyzed in the context of problems associated with and possibilities to enhance the European Landscape Convention and Agenda for a sustainable and competitive European tourism implementation. We have analyzed the contributions of reforms that have so far been implemented in current legislation and of planning bases to the establishment of coordinated sustainable territorial development planning and management in Serbia and to the procurement of support for the integration of sustainable tourism development and landscape planning and management into the process of spatial, environmental and sectoral planning. The approach to and problems of landscape protection and sustainable tourism development occurring in the practice in spatial planning are analyzed through examples of a new generation of spatial plans - the Spatial Plan of the Republic of Serbia, and a spatial plan of the special-purpose area for the Nature Park and Tourism Region of Stara Planina Mountain. Through the example of Mt Stara Planina, the role of strategic environmental assessment in coordination with spatial and sectoral planning is analyzed, as well as potential contribution to landscape integration and sustainable tourism development in the process of planning. The possibilities for better coordination of Serbian strategic planning in achieving the sustainable spatial and tourism development, and possibilities to integrate landscapes into the planning process are indicated.

  13. Quality assurance plan for Final Waste Forms project in support of the development, demonstration, testing and evaluation efforts associated with the Oak Ridge reservation`s LDR/FFCA compliance

    Energy Technology Data Exchange (ETDEWEB)

    Gilliam, T.M.; Mattus, C.H.

    1994-07-01

    This quality assurance project plan specifies the data quality objectives for Phase I of the Final Waste Forms Project and defines specific measurements and processes required to achieve those objectives. Although the project is funded by the U.S. Department of Energy (DOE), the ultimate recipient of the results is the U.S. Environmental Protection Agency (EPA). Consequently, relevant quality assurance requirements from both organizations must be met. DOE emphasizes administrative structure to ensure quality; EPA`s primary focus is the reproducibility of the generated data. The ten criteria of DOE Order 5700.6C are addressed in sections of this report, while the format used is that prescribed by EPA for quality assurance project plans.

  14. 75 FR 70114 - Amendment to the Interim Final Rules for Group Health Plans and Health Insurance Coverage...

    Science.gov (United States)

    2010-11-17

    ... HEALTH AND HUMAN SERVICES Office of Consumer Information and Insurance Oversight 45 CFR Part 147 RIN 0950-AA17 [OCIIO-9991-IFC2] Amendment to the Interim Final Rules for Group Health Plans and Health Insurance... Administration, Department of Labor; Office of Consumer Information and Insurance Oversight, Department of Health...

  15. 77 FR 76067 - Notice of Availability of a Proposed Land Use Plan Amendment and Final Environmental Impact...

    Science.gov (United States)

    2012-12-26

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [CACA-051552, LLCAD0700 L51010000 FX0000 LVRWB10B3980] Notice of Availability of a Proposed Land Use Plan Amendment and Final Environmental Impact Statement for the Proposed McCoy Solar Energy Project, CA AGENCY: Bureau of Land Management, Interior...

  16. Development and Application of a Low Impact Development (LID-Based District Unit Planning Model

    Directory of Open Access Journals (Sweden)

    Cheol Hee Son

    2017-01-01

    Full Text Available The purpose of this study was to develop a low impact development-based district unit planning (LID-DP model and to verify the model by applying it to a test site. To develop the model, we identified various barriers to the urban planning process and examined the advantages of various LID-related techniques to determine where in the urban development process LID would provide the greatest benefit. The resulting model provides (1 a set of district unit planning processes that consider LID standards and (2 a set of evaluation methods that measure the benefits of the LID-DP model over standard urban development practices. The developed LID-DP process is composed of status analysis, comprehensive analysis, basic plan, and sectoral plans. To determine whether the LID-DP model met the proposed LID targets, we applied the model to a test site in Cheongju City, Chungcheongbuk-do Province, Republic of Korea. The test simulation showed that the LID-DP plan reduced nonpoint source pollutants (total nitrogen, 113%; total phosphorous, 193%; and biological oxygen demand, 199%; reduced rainfall runoff (infiltration volume, 102%; surface runoff, 101%; and improved the conservation rate of the natural environment area (132%. The successful application of this model also lent support for the greater importance of non-structural techniques over structural techniques in urban planning when taking ecological factors into account.

  17. Neutral beam development plan

    International Nuclear Information System (INIS)

    Staten, H.S.

    1980-08-01

    The national plan is presented for developing advanced injection systems for use on upgrades of existing experiments, and use on future facilities such as ETF, to be built in the late 1980's or early 90's where power production from magnetic fusion will move closer to a reality. Not only must higher power and longer pulse length systems be developed , but they must operate reliably; they must be a tool for the experimenter, not the experiment itself. Neutral beam systems handle large amounts of energy and as such, they often are as complicated as the plasma physics experiment itself. This presents a significant challenge to the neutral beam developer

  18. Development of an Integrated Waste Plan for Chalk River Laboratories - 13376

    International Nuclear Information System (INIS)

    Jones, L.

    2013-01-01

    To further its Strategic Planning, the Atomic Energy of Canada Limited (AECL) required an effective approach to developing a fully integrated waste plan for its Chalk River Laboratories (CRL) site. Production of the first Integrated Waste Plan (IWP) for Chalk River was a substantial task involving representatives from each of the major internal stakeholders. Since then, a second revision has been produced and a third is underway. The IWP remains an Interim IWP until all gaps have been resolved and all pathways are at an acceptable level of detail. Full completion will involve a number of iterations, typically annually for up to six years. The end result of completing this process is a comprehensive document and supporting information that includes: - An Integrated Waste Plan document summarizing the entire waste management picture in one place; - Details of all the wastes required to be managed, including volume and timings by waste stream; - Detailed waste stream pathway maps for the whole life-cycle for each waste stream to be managed from pre-generation planning through to final disposition; and - Critical decision points, i.e. decisions that need to be made and timings by when they need to be made. A waste inventory has been constructed that serves as the master reference inventory of all waste that has been or is committed to be managed at CRL. In the past, only the waste that is in storage has been effectively captured, and future predictions of wastes requiring to be managed were not available in one place. The IWP has also provided a detailed baseline plan at the current level of refinement. Waste flow maps for all identified waste streams, for the full waste life cycle complete to disposition have been constructed. The maps identify areas requiring further development, and show the complexities and inter-relationships between waste streams. Knowledge of these inter-dependencies is necessary in order to perform effective options studies for enabling

  19. Proposed Hydro-Quebec development plan, 1993: Proposal

    International Nuclear Information System (INIS)

    1992-01-01

    The Quebec government now requires Hydro-Quebec to submit a development plan every three years instead of annually, in order to permit more in-depth studies and a broader consultation with interested parties. In the first of such three-year plans, a series of plan proposals is presented which was developed after a year of consultation with various groups on four fundamental matters: energy efficiency, means of generation, electro-intensive industries, and electricity exports. Options for meeting future demand at Hydro-Quebec are assessed, including the construction of new generation and transmission facilities, rehabilitation of existing facilities, improving electrical energy efficiency, and conservation strategies. These options are considered while applying the principle of sustainable development that respects the environment. Hydroelectricity will continue to be emphasized as the main source of generation since hydroelectric facilities offer distinct advantages in terms of costs, environmental impacts, and economic spinoffs. The proposed plan also presents objectives and strategies for improving the quality of service and internal operations. Financial forecasts for Hydro-Quebec are proposed which take into account the forecast changes in the utility's cost and revenue factors and its self-financing requirements. 5 figs., 15 tabs

  20. Our strategic plan | IDRC - International Development Research ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Knowledge. Innovation. Solutions. IDRC's strategic plan, Investing in Solutions, will guide our efforts from 2015 to 2020. Building on more than four decades of experience, the plan reaffirms our vision to produce knowledge, support innovation, and generate solutions to improve lives and livelihoods in the developing world.

  1. Salt repository sealing materials development program: 5-year work plan

    International Nuclear Information System (INIS)

    Myers, L.B.

    1986-06-01

    This plan covers 5 years (fiscal years 1986 through 1990) of work in the repository sealing materials program to support design decisions and licensing activities for a salt repository. The plan covers a development activity, not a research activity. There are firm deliverables as the end points of each part of the work. The major deliverables are: development plans for code development and materials testing; seal system components models; seal system performance specifications; seal materials specifications; and seal materials properties ''handbook.'' The work described in this plan is divided into three general tasks as follows: mathematical modeling; materials studies (salt, cementitious materials, and earthen materials); and large-scale testing. Each of the sections presents an overview, status, planned activities, and summary of program milestones. This plan will be the starting point for preparing the development plans described above, but is subject to change if preparation of the work plan indicates that a different approach or sequence is preferable to achieve the ultimate goal, i.e., support of design and licensing

  2. Development of Comprehensive Nuclear Safety Regulation Plan for 2007-2011

    International Nuclear Information System (INIS)

    Choi, Young Sung; Kim, Woong Sik; Park, Dong Keuk; Kim, Ho Ki

    2006-01-01

    The Article 8-2 of Atomic Energy Act requires the government to establish Atomic Energy Promotion Plan every five years. It sets out national nuclear energy policies in a systematic and consistent way. The plan presents the goals and basic directions of national nuclear energy policies on the basis of current status and prospects. Both areas of utilization and safety management of nuclear energy are included and various projects and schedules are delineated based on the national policy directions. The safety management area in this plan deals with the overall safety and regulation policy. Its detail projects and schedule should be developed in separate plans by responsible ministries under the mediation of the MOST. As a regulatory authority, MOST is responsible for safety management area and its technical support organization, KINS has developed Comprehensive Nuclear Safety Regulation Plan as an implementation plan of safety area. This paper presents the development process and specific projects contained in the Comprehensive Nuclear Safety Regulation Plan which is under development now

  3. Strategic planning--a plan for excellence for South Haven Health System.

    Science.gov (United States)

    Urbanski, Joanne; Baskel, Maureen; Martelli, Mary

    2011-01-01

    South Haven Health System has developed an innovative approach to strategic planning. The key to success of this process has been the multidisciplinary involvement of all stakeholders from the first planning session through the final formation of a strategic plan with measurable objectives for each goal. The process utilizes a Conversation Café method for identifying opportunities and establishing goals, Strategic Oversight Teams to address each goal and a Champion for implementation of each objective. Progress is measured quarterly by Strategic Oversight Team report cards. Transparency of communication within the organization and the sharing of information move the plan forward. The feedback from participant evaluations has been overwhelmingly positive. They are involved and excited.

  4. 77 FR 24483 - Wausau Paper Mills, LLC; Notice of Final Land Management Plan and Soliciting Comments, Motions To...

    Science.gov (United States)

    2012-04-24

    ... Mills, LLC; Notice of Final Land Management Plan and Soliciting Comments, Motions To Intervene, and...: Wausau Paper Mills, LLC. e. Name of Project: Rhinelander Hydroelectric Project. f. Location: The upper.... Applicant Contact: Mr. Tim Hasbargen, Wausau Paper Mills, LLC, 515 Davenport St., Rhinelander, Wisconsin...

  5. National spatial development planning in South Africa 1930-2010 ...

    African Journals Online (AJOL)

    National spatial development planning in South Africa 1930-2010: An introductory comparative analysis. ... Town and Regional Planning ... It demonstrates that, despite the ostensible support for national planning during this period, such plans and proposals rarely had a direct impact on the conduct of government business.

  6. Final technical evaluation report for the proposed revised reclamation plan for the Atlas Corporation Moab Mill

    International Nuclear Information System (INIS)

    1997-03-01

    This final Technical Evaluation Report (TER) summarizes the US Nuclear Regulatory Commission staff's review of Atlas Corporation's proposed reclamation plan for its uranium mill tailings pile near Moab, Utah. The proposed reclamation would allow Atlas to (1) reclaim the tailings pile for permanent disposal and long-term custodial care by a government agency in its current location on the Moab site, (2) prepare the site for closure, and (3) relinquish responsibility of the site after having its NRC license terminated. The NRC staff concludes that, subject to license conditions identified in the TER, the proposed reclamation plan meets the requirements identified in NRC regulations, which appear primarily in 10 CFR Part 40. 112 refs., 6 figs., 16 tabs

  7. Hazardous Waste Development, Demonstration, and Disposal (HAZWDDD) Program Plan

    International Nuclear Information System (INIS)

    McGinnis, C.P.; Eisenhower, B.M.; Reeves, M.E.; DePaoli, S.M.; Stinton, L.H.; Harrington, E.H.

    1989-02-01

    The objective of the Hazardous Waste Development, Demonstration and Disposal (HAZWDDD) Program Plan is to ensure that the needs for treatment and disposal of all its hazardous and mixed wastes have been identified and planned for. A multifaceted approach to developing and implementing this plan is given, including complete plans for each of the five installations, and an overall integrated plan is also described in this report. The HAZWDDD Plan accomplishes the following: (1) provides background and organizational information; (2) summarizes the 402 hazardous and mixed waste streams from the five installations by grouping them into 13 general waste categories; (3) presents current treatment, storage, and disposal capabilities within Energy Systems; (4) develops a management strategy by outlining critical issues, presents flow sheets describing management schemes for problem waste streams, and builds on the needs identified; (5) outlines specific activities needed to implement the strategy developed; and (6) presents schedule and budget requirements for the next decade. The HAZWDDD Program addresses current and future technical problems and regulatory issues and uncertainties. Because of the nature and magnitude of the problems in hazardous and mixed waste management, substantial funding will be required. 10 refs., 39 figs., 16 tabs

  8. SU-F-T-100: Development and Implementation of a Treatment Planning Tracking System Into the Radiation Oncology Clinic

    International Nuclear Information System (INIS)

    Kabat, C; Cline, K; Li, Y; Ha, C; Stathakis, S

    2016-01-01

    Purpose: With increasing numbers of cancer patients being diagnosed and the complexity of radiotherapy treatments rising it’s paramount that patient plan development continues to stay fluid within the clinic. In order to maintain a high standard of care and clinical efficiency the establishment of a tracking system for patient plan development allows healthcare providers to view real time plan progression and drive clinical workflow. In addition, it provides statistical datasets which can further identify inefficiencies within the clinic. Methods: An application was developed utilizing Microsoft’s ODBC SQL database engine to track patient plan status throughout the treatment planning process while also managing key factors pertaining to the patient’s treatment. Pertinent information is accessible to staff in many locations, including tracking monitors within dosimetry, the clinic network for both computers and handheld devices, and through email notifications. Plans are initiated with a CT and continually tracked through planning stages until final approval by staff. Patient’s status is dynamically updated by the physicians, dosimetrists, and medical physicists based on the stage of the patient’s plan. Results: Our application has been running over a six month period with all patients being processed through the system. Modifications have been made to allow for new features to be implemented along with additional tracking parameters. Based on in-house feedback, the application has been supportive in streamlining patient plans through the treatment planning process and data has been accumulating to further improve procedures within the clinic. Conclusion: Over time the clinic will continue to track data with this application. As data accumulates the clinic will be able to highlight inefficiencies within the workflow and adapt accordingly. We will add in new features to help support the treatment planning process in the future.

  9. SU-F-T-100: Development and Implementation of a Treatment Planning Tracking System Into the Radiation Oncology Clinic

    Energy Technology Data Exchange (ETDEWEB)

    Kabat, C; Cline, K; Li, Y; Ha, C; Stathakis, S [University of Texas HSC SA, San Antonio, TX (United States)

    2016-06-15

    Purpose: With increasing numbers of cancer patients being diagnosed and the complexity of radiotherapy treatments rising it’s paramount that patient plan development continues to stay fluid within the clinic. In order to maintain a high standard of care and clinical efficiency the establishment of a tracking system for patient plan development allows healthcare providers to view real time plan progression and drive clinical workflow. In addition, it provides statistical datasets which can further identify inefficiencies within the clinic. Methods: An application was developed utilizing Microsoft’s ODBC SQL database engine to track patient plan status throughout the treatment planning process while also managing key factors pertaining to the patient’s treatment. Pertinent information is accessible to staff in many locations, including tracking monitors within dosimetry, the clinic network for both computers and handheld devices, and through email notifications. Plans are initiated with a CT and continually tracked through planning stages until final approval by staff. Patient’s status is dynamically updated by the physicians, dosimetrists, and medical physicists based on the stage of the patient’s plan. Results: Our application has been running over a six month period with all patients being processed through the system. Modifications have been made to allow for new features to be implemented along with additional tracking parameters. Based on in-house feedback, the application has been supportive in streamlining patient plans through the treatment planning process and data has been accumulating to further improve procedures within the clinic. Conclusion: Over time the clinic will continue to track data with this application. As data accumulates the clinic will be able to highlight inefficiencies within the workflow and adapt accordingly. We will add in new features to help support the treatment planning process in the future.

  10. Participation in planning – A study of urban development in Norway

    Directory of Open Access Journals (Sweden)

    Eva Irene Falleth

    2011-08-01

    Full Text Available In Norway, the dominance of neo-liberal ideas has resulted in a private planning practice whereby the developer is the principal actor in opaque negotiations between planning authorities and developers. We examine patterns of contact between stakeholders in urban development planning. Based on information obtained from a survey of the 145 most populous municipalities in Norway, as well as from case studies in Oslo, Bergen and Trondheim, we find considerable interaction between the stakeholders involved in the planning process. The interaction patterns are different for civil society actors and private developers. We find that while developers have contacts with the planning authorities, the civil actors have contacts with the politicians. In the initial phase, i.e. before formal planning begins, this pattern is highly significant. Politicians frequently feel bound by negotiations and agreements that are made by the planners and the developers during the initial planning process.

  11. Planning for energy resource development

    Energy Technology Data Exchange (ETDEWEB)

    Magai, B S [Dept. of Mech. Eng., IIT Bombay, India

    1975-01-01

    A general review is provided of the national energy resources of India. They include wind power, tidal power, geothermal energy, and nuclear fission and fusion. Their present (1975) contribution to India's total energy requirements and the possibility of their accelerated development and impact on the national economy are discussed. Due to the serious proportions which the energy situation is assuming, it is suggested that a national energy council be set up within the Ministry of Energy to review all matters pertaining to energy, and to assume planning and evaluation responsibilities. It is also recommended that a Department of Energy Research, Development, and Demonstration be established as an autonomous agency which would carry out programs in utilization, conservation, environment, economics, and education. Present efforts by various ministries are fragmented and diverge in policy, leadership, and planning. It is believed that the proposed organizations would coordinate energy programs with national objectives.

  12. 75 FR 80850 - Development of Strategic Plan 2011-2015

    Science.gov (United States)

    2010-12-23

    ... intended for use as LSC embarks on its planning process. LSC anticipates publishing a draft Strategic Plan... process to develop a Strategic Plan for the years 2011-2015. Toward that end, LSC is soliciting... strategic planning efforts. In addition, Among other sources, LSC is considering the guidance provided by...

  13. Workshop for development of formal MC and A plans

    International Nuclear Information System (INIS)

    Erkkila, B.H.; Hatcher, C.R.; Scott, S.C.; Thomas, K.E.

    1998-01-01

    Upgrades to both physical protection and material controls and accountability (MC and A) are progressing at many nuclear facilities in the Russian Federation. In general, Russian facilities are well prepared to address issues related to physical protection. The infrastructure to plan and implement physical protection upgrades is already in place in Russia. The infrastructure to integrate new and existing MC and A capabilities is not as well developed. The authors experience has shown that working with Russian facility management and technical personnel to draft an MC and A plan provides a way of moving MC and A upgrades forward. Los Alamos has developed a workshop for Russian nuclear facilities to facilitate the preparation of their facility MC and A plans. The workshops have been successful in bringing together facility management, safeguards specialists, and operations personnel to initiate the process of drafting these MC and A plans. The MC and A plans provide the technical basis for scheduling future MC and A upgrades at the facilities. Although facility MC and A plans are site specific, the workshop can be tailored to guide the development of an MC and A plan for any Russian nuclear site

  14. APPLICATION OF METHODOLOGY OF STRATEGIC PLANNING IN DEVELOPING NATIONAL PROGRAMMES ON DEVELOPMENT

    Directory of Open Access Journals (Sweden)

    Inna NOVAK

    2015-07-01

    Full Text Available Actuality: The main purpose of strategic planning is that long-term interests of sustainable development of a market economy require the use of effective measures of state regulation of economic and social processes. Objective: The aim of the article is determined to analyze the development of strategic planning methodology and practical experience of its application in the design of national development programs. Methods: When writing the article the following research methods were used: analysis and synthesis, target-oriented and monographic. Results: In Ukraine at the level of state and local government authorities strategies of development of branches, regions, cities, etc. are being developed but given the lack of state funding a unified investment strategy of the country is not developed. After analyzing development of the strategic planning methodology and examples of its application in the design of state development programs we identified the need to develop an investment strategy of the state (sectors, regions, etc., as due to defined directions and guidelines of the activity it will increase the investment level in the country and ensure national strategy “Ukraine-2020”.

  15. Motivations and Barriers for Policymakers to Developing State Adaptation Plans

    Science.gov (United States)

    Miller, R.; Sylak-Glassman, E.

    2016-12-01

    Current approaches for developing high-quality adaptation plan require significant resources. In recent years, communities have grown to embrace adaptive plans across multiple forms, including adaptive capacity assessments, resilience strategies, and vulnerability assessments. Across the United States, as of this writing, 14 states have established adaptation plans, with another 8 states having begun the process. Given the high resources requirements and increasing interest in the development of adaptation plans, we aim to examine patterns behind the establishment of resilience plans at the state level. We examine demographic, financial, political, and physical characteristics associated with different states in an effort to explore the reasoning behind investing in the development of adaptation plans. This analysis considers quantitative and qualitative factors, including recent elections for political parties, politicians' climate-related statements and campaign promises, demographics, budgets, and regional climate threats. The analysis aims to identify motivations for state leadership taking action to develop adaptation plans. Results from the analysis seek to identify the primary drivers and barriers associated with state-wide resilience planning. These results could inform the design of scientific communication tools or approaches to aid future adaptation responses to climate change.

  16. Sanitation planning in developing countries

    NARCIS (Netherlands)

    Kerstens, S.M.

    2016-01-01

    Sanitation planning in developing countries: Added value of resource recovery

    Worldwide 2.5 billion people lack access to sanitation. This impacts human live, the environment and represents a loss of valuable resources that can be regained from wastewater. This study

  17. Developing and assessing accident management plans for nuclear power plants

    International Nuclear Information System (INIS)

    Hanson, D.J.; Johnson, S.P.; Blackman, H.S.; Stewart, M.A.

    1992-07-01

    This document is the second of a two-volume NUREG/CR that discusses development of accident management plans for nuclear power plants. The first volume (a) describes a four-phase approach for developing criteria that could be used for assessing the adequacy of accident management plans, (b) identifies the general attributes of accident management plans (Phase 1), (c) presents a prototype process for developing and implementing severe accident management plans (Phase 2), and (d) presents criteria that can be used to assess the adequacy of accident management plans. This volume (a) describes results from an evaluation of the capabilities of the prototype process to produce an accident management plan (Phase 3) and (b), based on these results and preliminary criteria included in NUREG/CR-5543, presents modifications to the criteria where appropriate

  18. IDC Re-Engineering Phase 3 Development Plan.

    Energy Technology Data Exchange (ETDEWEB)

    Harris, James M. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Burns, John F. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Pollock, David L. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-01-01

    Sandia National Laboratories has prepared a project development plan that proposes how the parties interested in the IDC Re-Engineering system will coordinate its development, testing and transition to operations.

  19. IDC Re-Engineering Phase 3 Development Plan

    International Nuclear Information System (INIS)

    Harris, James M.; Burns, John F.; Pollock, David L.

    2017-01-01

    Sandia National Laboratories has prepared a project development plan that proposes how the parties interested in the IDC Re-Engineering system will coordinate its development, testing and transition to operations.

  20. Developing an interdisciplinary certificate program in transportation planning.

    Science.gov (United States)

    2010-09-01

    This project develops and implements a graduate certificate in transportation planning. Texas A&M : University (A&M) currently offers instruction in transportation through its Master of Urban Planning (MUP) : and Civil Engineering (CE) programs; howe...

  1. Planning Support Systems (PSS-Based Spatial Plan Alternatives and Environmental Assessment

    Directory of Open Access Journals (Sweden)

    Hee-Sun Choi

    2016-03-01

    Full Text Available Spatial planning is at the core of national land and urban development. Many countries and cities seek sustainable development through various means such as coordinated environmental planning, environmental assessment, and internalization of environmental analysis and planning. A Planning Support System (PSS is a GIS (Geographic Information System-based, spatial decision-making support system that incorporates a variety of theories and pertinent models. This study adopted the “What if?” model to design an alternative spatial plan that includes generation of predictive scenarios and is relatively easy to use. In the cities studied, we identified a total of six scenarios based on the main drivers of development—namely, population and spatial policies. Subsequently, we assessed the alternatives for their environmental impact, preparing sensitivity maps for each major environmental issue in the target area (natural ecosystem, air and microclimate, natural disasters. One projected advantage of the “What if?” model is that its digital visualization of proposed plans may improve public awareness and involvement. Furthermore, the tool is expected to be highly useful in ensuring the objectivity of quantitative analyses. However, it is necessary to develop a PSS that is both standardized and tailored to the particular needs of each area. Finally, the development of an e-governance system will be beneficial in ensuring public access to the decision making process.

  2. Planning of spatial development of tourism based on the example of spatial plan of Subotica municipality

    Directory of Open Access Journals (Sweden)

    Šećerov Velimir

    2008-01-01

    Full Text Available Planning of tourism development and its spatial disposition in Europe and world today are an important segment of the overall economic development. Having in mind its important economic and social functions, as well as its capability to intensify its other economic branches (agricultural and economic potentials, services of various types, transport and other in a certain territory, it is necessary to realize a precise valorization of tourist values in the spatial plan of municipality and to conclude at what point and at which places the tourism can represent on of development components of the entire economy of the territory to be planed. The example of the spatial plan of Subotica and main guidelines, concept and planning priorities which can be expected in the forthcoming period are presented in this paper. It is without any doubt that the municipality of Subotica with its geostrategic position, the proximity of the EU and important natural and cultural tourist potentials is a suitable space for application of contemporary principles of the tourism development planning and their correlation with other segments of integral development for the whole municipality.

  3. 34 CFR 200.27 - Development of a schoolwide program plan.

    Science.gov (United States)

    2010-07-01

    ... school year. (2) The school must develop the comprehensive plan with the involvement of parents... comprehensive plan to improve teaching and learning throughout the school. (2) The school must develop the..., parents, and the public. (2) Information in the plan must be— (i) In an understandable and uniform format...

  4. Planning for Interagency Cooperation in Rural Development. CARD Report 45.

    Science.gov (United States)

    Rogers, David L.; Glick, Edward L.

    With a major emphasis on cooperative planning in rural development, three elements of development process were identified: (1) integration of units involved, occurring when several organizations contribute to a larger collective effort; (2) decentralized planning and local initiative, occurring when planning initiative is at the local level; (3)…

  5. Long-term climate change assessment study plan for the Hanford Site permanent isolation Barrier Development Program

    International Nuclear Information System (INIS)

    Petersen, K.L.; Chatters, J.C.; Waugh, W.J.

    1992-07-01

    The Hanford Site Permanent Isolation Barrier Development Program (Barrier Development Program) was organized to develop the technology needed to provide an in-place disposal capability for the Hanford Site (Adams and Wing 1986; Wig and Gee 1990). The goal of the Barrier Development Program is to provide defensible evidence that final barrier design(s) will adequately control water infiltration; plant and animal intrusion; and wind and water erosion for a minimum of 1,000 yr and isolate wastes from the accessible environment and warm inadvertent human intruders using markers. This document describes the long-term climate change studies planned to support the Barrier Development Program. The plan outlines a multi-year and multi-discipline approach to assess long-term climate change issues and to help optimize the design of the permanent isolation barriers. A multi-disciplinary approach to climatic data acquisition will be responsible for obtaining needed information for concurrent barrier tasks and for developing a local climate forecast model. This model will couple past climate patterns with models of regional and global climate drivers to provide bounding conditions for barrier performance assessment analyses

  6. Development planning and employment generations: achievements ...

    African Journals Online (AJOL)

    Development planning and employment generations: achievements, challenges and ... Open Access DOWNLOAD FULL TEXT ... The paper mainly utilizes secondary data through the analysis of books, journals, reports and electronic sources.

  7. Model Watershed Plan; Lemhi, Pahsimeroi, and East Fork of the Salmon River Management Plan, 1995 Technical Report.

    Energy Technology Data Exchange (ETDEWEB)

    Swift, Ralph

    1995-11-01

    Idaho`s Model Watershed Project was established as part of the Northwest Power Planning Council`s plan for salmon recovery in the Columbia River Basin. The Council`s charge was simply stated and came without strings. The tasks were to identify actions within the watershed that are planned or needed for salmon habitat, and establish a procedure for implementing habitat-improvement measures. The Council gave the responsibility of developing this project to the Idaho Soil Conservation Commission. This Model Watershed Plan is intended to be a dynamic plan that helps address these two tasks. It is not intended to be the final say on either. It is also not meant to establish laws, policies, or regulations for the agencies, groups, or individuals who participated in the plan development.

  8. Final technical evaluation report for the proposed revised reclamation plan for the Atlas Corporation Moab Mill

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    This final Technical Evaluation Report (TER) summarizes the US Nuclear Regulatory Commission staff`s review of Atlas Corporation`s proposed reclamation plan for its uranium mill tailings pile near Moab, Utah. The proposed reclamation would allow Atlas to (1) reclaim the tailings pile for permanent disposal and long-term custodial care by a government agency in its current location on the Moab site, (2) prepare the site for closure, and (3) relinquish responsibility of the site after having its NRC license terminated. The NRC staff concludes that, subject to license conditions identified in the TER, the proposed reclamation plan meets the requirements identified in NRC regulations, which appear primarily in 10 CFR Part 40. 112 refs., 6 figs., 16 tabs.

  9. Intelligent transportation systems business plan for Kentucky : final report.

    Science.gov (United States)

    2001-09-01

    This report presents a Business Plan for Intelligent Transportation Systems (ITS) in Kentucky. The purpose of the Business Plan is to define ITS projects that are planned for implementation from 2002 through 2007. The list of projects contained withi...

  10. Language Planning and Development Aid: The (In)Visibility of Language in Development Aid Discourse

    Science.gov (United States)

    Taylor-Leech, Kerry; Benson, Carol

    2017-01-01

    Despite the essential role of local, regional, national and international languages in human development, there is little reference to language planning in development aid discourse. Beginning with definitions of development aid and language planning, the paper examines how the two were linked in pre- and post-colonial times, showing how language…

  11. Highlights of the SSC Site Development Plan

    International Nuclear Information System (INIS)

    Sanford, J.R.

    1991-10-01

    This paper summarizes highlights of the Site Development Plan for the Superconducting Super Collider Laboratory. The Plan, sometimes called a Master Plan, was prepared by the architectural and engineering firm for the Laboratory: Parsons Brinckerhoff/Morrison Knudsen (PB/MK) working in association with CRSS. Their task was to interpret the SSC project needs in the context of the Ellis County, Texas site. The team effort was under the direction of Lewis May from CRSS, guided by Robert Sims from the SSC Laboratory. Conceptual drawings are presented in this report

  12. Planning for Development in the Arab Gulf States: A content Analysis of Current Development Plans

    DEFF Research Database (Denmark)

    Hvidt, Martin

    2012-01-01

    Abstract: This paper analyses current development plans published by the GCC states (Bahrain, Kuwait, Oman, Qatar, Saudi Arabia, and the United Arab Emirates) in order to explore the region’s future growth trajectory: what barriers to growth are foreseen and how can they be anticipated; what...

  13. Driving change : sustainable development action plans Guidance

    OpenAIRE

    Sustainable Development Commission

    2008-01-01

    This guidance builds upon the Sustainable Development Commission’s previous guidance, Getting Started (August 2005), which set out the basic elements that the Sustainable Development Commission would expect to see in a good Sustainable Development Action Plan. Publisher PDF Original published August 2005.

  14. Development of the biosphere code BIOMOD: final report

    International Nuclear Information System (INIS)

    Kane, P.

    1983-05-01

    Final report to DoE on the development of the biosphere code BIOMOD. The work carried out under the contract is itemised. Reference is made to the six documents issued along with the final report. These consist of two technical notes issued as interim consultative documents, a user's guide and a programmer's guide to BIOMOD, a database description, program test document and a technical note entitled ''BIOMOD - preliminary findings''. (author)

  15. Claims Procedure for Plans Providing Disability Benefits; 90-Day Delay of Applicability Date. Final rule; delay of applicability

    Science.gov (United States)

    2017-11-29

    This document delays for ninety (90) days--through April 1, 2018--the applicability of a final rule amending the claims procedure requirements applicable to ERISA-covered employee benefit plans that provide disability benefits (Final Rule). The Final Rule was published in the Federal Register on December 19, 2016, became effective on January 18, 2017, and was scheduled to become applicable on January 1, 2018. The delay announced in this document is necessary to enable the Department of Labor to carefully consider comments and data as part of its effort, pursuant to Executive Order 13777, to examine regulatory alternatives that meet its objectives of ensuring the full and fair review of disability benefit claims while not imposing unnecessary costs and adverse consequences.

  16. Strategic plan for the development of IAEA safeguards equipment

    International Nuclear Information System (INIS)

    Khlebnikov, N.

    2001-01-01

    Full text: The need for a top-down Safeguards Strategy to focus departmental objectives was recognized by the Programme Performance Appraisal System (PPAS) performed on the Equipment Development Project in 1999. The Department of Safeguards prepared at the end of 2000 a 5-year Strategic Plan to identify the changes and improvements expected to take place over the 2001-2005 period. Those Strategic Objectives were supposed to be used to properly plan IAEA Safeguards activities and define appropriate and coherent R and D programmes. The present paper describes the strategic directions that the IAEA will follow in the area of equipment development in order to meet the Safeguards Department long-term objectives for 2001-2005. The paper, which is derived from the IAEA Strategic Equipment Development Plan, prepared by the Division of Technical Support, includes two parts: general principles and policies applicable to all equipment development tasks; specific strategic guidance. The paper will not describe the detailed plans which are prepared based on the strategic plan on a biannual basis. Equipment development activities have been divided in five major projects (NDA, Seals, Surveillance, Unattended Monitoring and Remote Monitoring). Strategic directions for each of these projects will be described in the paper. Separate sections will deal with equipment development strategic guidance in the area of additional protocol inspections, JNFL projects, illicit trafficking and Trilateral Initiative. (author)

  17. Energy Organizational Planning

    Energy Technology Data Exchange (ETDEWEB)

    Gina C. Paradis; James Yockey; Tracey LeBeau

    2009-04-17

    As the Seneca Nation of Indians (SNI) continues to refine and finalize its Strategic Energy Plan, it became necessary to insure that a sustainable organization structure was developed through which the energy program and its initiatives could be nurtured and managed. To that end, SNI undertook a study to thoroughly evaluate the existing organizational structures and assess the requisite changes and/or additions to that framework that would complement the mission of the Strategic Plan. The goal of this study was to analyze, work with staff and leadership and recommend the most effective plan for the development of an organizational framework within which the Seneca could more effectively exercise energy sovereignty – control and manage their natural resource assets – i.e. develop its own energy resources, meet the current and projected energy needs of their community, and “sit at the table” with other regional energy providers to deal with issues on a peer-to-peer basis.

  18. VTAE Equity Staff Development Workshops and Services--Phase II. Final Report.

    Science.gov (United States)

    Baldus, Lorayne; Nelson, Orville

    The Phase II Equity Staff Development project was revised in response to a need to develop an equity strategic planning model with a vision statement, goals, and objectives. The Equity Strategic Planning Model was presented to administrators of Wisconsin Vocational, Technical, and Adult Education (VTAE) colleges for their use in district strategic…

  19. Contextualising the National Development Plan for enhanced ...

    African Journals Online (AJOL)

    ... and Development. Strategy, Integrated Development Planning, enhanced service delivery .... Penderis (2012: 7) proffers that there is a vast body of ..... the various chapters, objectives and actions of the ..... financing and formulation of the ten.

  20. Municipal Development Plan, Acerra (Naples

    Directory of Open Access Journals (Sweden)

    Luigi Benevolo

    2014-02-01

    Full Text Available The Municipal Development Plan (Piano Urbanistico Comunale - PUC of Acerra has been drafted by a group of young professionals and researchers, led by Leonardo Benevolo, in accordance with the guidelines laid out by Regional Law no. 16 of 2004. Its complex drafting process was compressed into a brief, nine-month period in 2008 and 2009, at the end of which its initial adoption (or “predisposizione” – “preparation” or “predisposition” – in Italian legal terms was ratified by the municipal council. This article reconstructs the key moments, illustrating the main elements of the plan and how the debate about it took shape both inside and outside the municipal administration.

  1. Electric utility system planning studies for OTEC power integration. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-11-30

    Florida Power Corporation (FPC) conducted an evaluation of the possible integration of OTEC into the FPC system. Existing system planning procedures, assumptions, and corporate financial criteria for planning new generating capacity were used without modification. A baseline configuration for an OTEC plant was developed for review with standard planning procedures. The OTEC plant characteristics and costs were incorporated in considerable detail. These basic inputs were examined using the FPC system planning methods. It was found that with the initial set of conditions, OTEC would not be economically viable. Using the same system planning procedures, a number of adjustments were made to the key study assumptions. It was found that two considerations dominate the analysis; the assumed rate of fuel cost escalation, and the projected capital cost of the OTEC plant. The analysis produced a parametric curve: on one hand, if fuel costs were to escalate at a rate greater than assumed (12% vs the assumed 5% for coal), and if no change were made to the OTEC input assumptions, the basic economic competitive criteria would be equivalent to the principal alternative, coal fueled plants. Conversely, if the projected cost of the OTEC plant were to be reduced from the assumed $2256/kW to $1450/kW, the economic competitiveness criterion would be satisfied. After corporate financial analysis, it was found that even if the cost competitive criterion were to be reached, the plan including OTEC could not be financed by Florida Power Corporation. Since, under the existing set of conditions for financing new plant capital requirements, FPC could not construct an OTEC plant, some other means of ownership would be necessary to integrate OTEC into the FPC system. An alternative such as a third party owning the plant and selling power to FPC, might prove attractive. (WHK)

  2. 1989 basic plan for atomic energy development and utilization

    International Nuclear Information System (INIS)

    1989-01-01

    A Basic Plan for Atomic Energy Development and Utilization has been established each year based on the guidelines set up by the Atomic Energy Commission of Japan, with the aim of promoting the development and utilization of atomic energy schematically and efficiently. The Basic Plan shows specific projects to achieve the objectives specified in the Long-Range Plan for Atomic Energy Development and Utilization. The Basic Plan specifies efforts to be made for overall strengthening of safety measures (safety policies, safety research, disaster prevention, etc.), promotion of nuclear power generation, establishment of the nuclear fuel cycle (securing of uranium, technology for uranium enrichment, reprocessing, etc.), development of new types of power reactors (fast breeder reactor, new types of converter reactors, plutonium fuel processing technology), promotion of leading projects (nuclear fusion, utilization of radiations, atomic powered ships, high-temperature engineering tests), promotion of basic technology development (basic research, training of scientists and engineers), voluntary and active international activities (international cooperation), and acquisition of understanding and cooperation of the general public. (N,K.)

  3. Career Planning: Developing the Nation's Primary Resource.

    Science.gov (United States)

    Jarvis, Phillip S.

    Career planning is the most critical ingredient in developing a nation's primary resource, its workers. A 1988 Gallup Poll showed that 62 percent of U.S. workers had no career goal when they began their first job, and more than 50 percent felt they were in the wrong job. The same results probably could be applied to Canada. Career planning skills…

  4. Enterprise Architecture Planning in developing A planning Information System: a Case Study of Semarang State University

    Directory of Open Access Journals (Sweden)

    Budiman Kholiq

    2018-01-01

    Full Text Available This research has applied an integrated design and development of planning information system, which is been designed using Enterprise Architecture Planning. Frequent discrepancy between planning and realization of the budget that has been made, resulted in ineffective planning, is one of the reason for doing this research. The design using EAP aims to keep development aligned and in line with the strategic direction of the organization. In the practice, EAP is carried out in several stages of the planning initiation, identification and definition of business functions, proceeded with architectural design and EA implementation plan that has been built. In addition to the design of the Enterprise Architecture, this research carried out the implementation, and was tested by several methods of black box and white box. Black box testing method is used to test the fundamental aspects of the software, tested by two kinds of testing, first is using User Acceptance Testing and the second is using software functionality testing. White box testing method is used to test the effectiveness of the code in the software, tested using unit testing. Tests conducted using white box and black box on the integrated planning information system, is declared successful. Success in the software testing can not be ascertained if the software built has not shown any distinction from prior circumstance to the development of this integrated planning information system. For ensuring the success of this system implementation, the authors test consistency between the planning of data and the realization of prior-use of the information system, until after-use information system. This consistency test is done by reducing the time data of the planning and realization time. From the tabulated data, the planning information system that has been built reduces the difference between the planning time and the realization time, in which indicates that the planning information system

  5. Enterprise Architecture Planning in developing A planning Information System: a Case Study of Semarang State University

    Science.gov (United States)

    Budiman, Kholiq; Prahasto, Toni; Kusumawardhani, Amie

    2018-02-01

    This research has applied an integrated design and development of planning information system, which is been designed using Enterprise Architecture Planning. Frequent discrepancy between planning and realization of the budget that has been made, resulted in ineffective planning, is one of the reason for doing this research. The design using EAP aims to keep development aligned and in line with the strategic direction of the organization. In the practice, EAP is carried out in several stages of the planning initiation, identification and definition of business functions, proceeded with architectural design and EA implementation plan that has been built. In addition to the design of the Enterprise Architecture, this research carried out the implementation, and was tested by several methods of black box and white box. Black box testing method is used to test the fundamental aspects of the software, tested by two kinds of testing, first is using User Acceptance Testing and the second is using software functionality testing. White box testing method is used to test the effectiveness of the code in the software, tested using unit testing. Tests conducted using white box and black box on the integrated planning information system, is declared successful. Success in the software testing can not be ascertained if the software built has not shown any distinction from prior circumstance to the development of this integrated planning information system. For ensuring the success of this system implementation, the authors test consistency between the planning of data and the realization of prior-use of the information system, until after-use information system. This consistency test is done by reducing the time data of the planning and realization time. From the tabulated data, the planning information system that has been built reduces the difference between the planning time and the realization time, in which indicates that the planning information system can motivate the

  6. Daybreak - a corporation plan of development and capacitation; Amanecer - un plan corporativo de desarollo y capacitacion

    Energy Technology Data Exchange (ETDEWEB)

    Pellegrini, Enzo [REPSOL Yacimientos Petroliferos Fiscales S.A. (Argentina)

    2000-07-01

    The current growth in production investments is motivating a war for talent which demands from companies a serious compromise to the recruiting of personnel as well as development and training policies that will build: technical competencies related to teamwork; high tech tools and knowledge; general training that will nourish employability in an increasingly competitive environment. Repsol YPF Group, within its Corporate Plan for Development and Training, implemented Plan Amanecer. Following is a general outline of the Plan. (author)

  7. Global Nuclear Energy Partnership Technology Development Plan

    Energy Technology Data Exchange (ETDEWEB)

    David J. Hill

    2007-07-01

    This plan describes the GNEP Technology Demonstration Program (GNEP-TDP). It has been prepared to guide the development of integrated plans and budgets for realizing the domestic portion of the GNEP vision as well as providing the basis for developing international cooperation. Beginning with the GNEP overall goals, it describes the basic technical objectives for each element of the program, summarizes the technology status and identifies the areas of greatest technical risk. On this basis a proposed technology demonstration program is described that can deliver the required information for a Secretarial decision in the summer of 2008 and support construction of facilities.

  8. Development of 3-D Radiosurgery Planning System Using IBM Personal Computer

    International Nuclear Information System (INIS)

    Suh, Tae Suk; Park, Charn Il; Ha, Sung Whan; Kang, Wee Saing; Suh, Doug Young; Park, Sung Hun

    1993-01-01

    Recently, stereotactic radiosurgery plan is required with the information of 3-D image and dose distribution. A project has been doing if developing LINAC based stereotactic radiosurgery since April 1991. The purpose of this research is to develop 3-D radiosurgery planning system using personal computer. The procedure of this research is based on two steps. The first step is to develop 3-D localization system, which input the image information of the patient, coordinate transformation, the position and shape of target, and patient contour into computer system using CT image and stereotactic frame. The second step is to develop 3-D dose planning system, which compute dose distribution on image plane, display on high resolution monitor both isodose distribution and patient image simultaneously and develop menu-driven planning system. This prototype of radiosurgery planning system was applied recently for several clinical cases. It was shown that our planning system is fast, accurate and efficient while making it possible to handle various kinds of image modalities such as angiography, CT and MRI. It makes it possible to develop general 3-D planning system using beam eye view or CT simulation in radiation therapy in future

  9. A study on research and development planning of the nuclear energy

    International Nuclear Information System (INIS)

    Won, Byung Chul; Kim, Y. J.; Hong, J. J.

    2002-01-01

    In this research planning, planning object is taken as 4 projects in nuclear safety field, 2 projects in reactor and nuclear fuel field, 2 projects in basic and fundamental field among 'Mid and Long-term Nuclear R and D Program'. These projects were all carried out by KAERI and their intermediate R and D phase is closed in 2001. Major planning contents in each project contains 1) R and D's necessity and aim, 2) Technological level and depth, 3) R and D's plan, 4) R and D's results application. The planning results are summarized as follows: - Development of risk management technology - Development of optimal severe accident management strategy and engineering safety features - Development of verification and assessment technology for thermal hydraulic safety - Technology development for enhancing component and structure integrity - Proliferation-resistant fuel technology development - Liquid metal reactor design technology development - Nuclear material technology development: characterization and improvement of nuclear materials - Development of a large proton accelerator for innovative researches

  10. Development of Secondary Route Bridge Design Plan Guides

    Science.gov (United States)

    2018-03-03

    The objective of this study is to develop a set of bridge plan guides for low-volume traffic roads. The purpose of the plans is to facilitate construction of new structures suitable for local agencies. The designs are to specifically address common l...

  11. Gas development plan - Lithuania

    International Nuclear Information System (INIS)

    1993-10-01

    A detailed description of the plan for the development of gas utilization in Lithuania is presented. The plan is subdivided under the headings of gas supply, gas demand, gas transmission and distribution, economy and the organization of the gas sector in the country. The first phase of the project has been undertaken by a Danish firm in cooperation with the Lithuanian firm Lietuvos Dujos. The first aim was to clarify the problems that will arise in connection with this joint venture on developing the use of gas in Lithuania, focusing on existing gas supply and market conditions, the current flow control and metering and economic constraints. The organization of the gas sector in the country as it stands today is described and possible models for its future organization are discussed in addition to a strategy of implementation. Possible development trends are outlined and maximum/minimum demand scenarios are suggested. Subjects and areas related to the gas sector in Lithuania are identified for further investigation in the next phase. It is stated that Lithuania is at present undergoing a fast transformation towards a market economy and that the transfer of foreign currency has been liberalized. Only the pipeline from Minsk to Vilnius is open at present and provides the total supply of natural gas to Lithuania and Kalingrad, controlled by the Russian gas company, Lentransgas, on the basis of a gas purchase agreement regulated on a yearly basis. Other possible supply sources are the Danish part of the North Sea and the Norwegian offshore fields. (AB)

  12. Eco and Green cities as new approaches for planning and developing cities in Egy

    Directory of Open Access Journals (Sweden)

    Hosam K. El Ghorab

    2016-03-01

    This paper will introduce the first practice in planning and developing Green and Eco new city in Egypt (located at Eastern Desert, Sohaj governorate, on the corridor of Upper Egypt⧹Red Sea, including elaboration of its urban structure, land use and its green systems which produce most of its needed infrastructure (specially electricity power network, integrated sewage and solid waste management systems without making any pressures on the national and local existing infrastructure systems. Finally, the paper will conclude lessons learned from the introduced practice, and present recommendations to improve Egyptian cities and make it more sustainable.

  13. PFP functional development planning guide

    International Nuclear Information System (INIS)

    SINCLAIR, J.C.

    1999-01-01

    The PFP Functional Development Planning Guide presents the strategy and process used for the identification, development, and analysis of functions (activities) necessary to satisfy the requirements within the Plutonium Finishing Plant (PFP) integrated project baseline. The functional analysis will provide the basis for the development of a function driven work breakdown structure. Future revisions to this document will include as attachments the results of the PFP Functional Analysis resulting from this approach. This document is intended be a Project-owned management tool. As such, the guide will periodically require revisions resulting from improvements of the information, processes, and techniques as now described

  14. National rf technology research and development program plan

    International Nuclear Information System (INIS)

    1983-05-01

    This plan was prepared by the Oak Ridge National Laboratory at the request of the Office of Fusion Energy, Division of Development and Technology, to define the technology development needs and priorities. The US rf research and development community, with a wide representation from universities, laboratories and industries, participated in many discussions, meetings and in a three-day workshop in developing the needs and priorities definition. This very active and effective involvement of the rf leaders from all of these groups was an essential feature of the activity and results in the plan representing a broad consensus from the magnetic fusion energy development community. In addition, a number of scientists from Japan and Europe participated by providing data

  15. Development and Reliability of the Comprehensive Crisis Plan Checklist

    Science.gov (United States)

    Aspiranti, Kathleen B.; Pelchar, Taylor K.; McCLeary, Daniel F.; Bain, Sherry K.; Foster, Lisa N.

    2011-01-01

    It is of vital importance that children are educated in a safe environment. Every school needs to have a well-developed crisis management document containing plans for prevention, intervention, and postvention. We developed the Comprehensive Crisis Plan Checklist (CCPC) to serve as a valuable tool that can be used to assist practitioners with…

  16. A multi-objective approach for developing national energy efficiency plans

    International Nuclear Information System (INIS)

    Haydt, Gustavo; Leal, Vítor; Dias, Luís

    2014-01-01

    This paper proposes a new approach to deal with the problem of building national energy efficiency (EE) plans, considering multiple objectives instead of only energy savings. The objectives considered are minimizing the influence of energy use on climate change, minimizing the financial risk from the investment, maximizing the security of energy supply, minimizing investment costs, minimizing the impacts of building new power plants and transmission infrastructures, and maximizing the local air quality. These were identified through literature review and interaction with real decision makers. A database of measures is established, from which millions of potential EE plans can be built by combining measures and their respective degree of implementation. Finally, a hybrid multi-objective and multi-criteria decision analysis (MCDA) model is proposed to search and select the EE plans that best match the decision makers’ preferences. An illustration of the working mode and the type of results obtained from this novel hybrid model is provided through an application to Portugal. For each of five decision perspectives a wide range of potential best plans were identified. These wide ranges show the relevance of introducing multi-objective analysis in a comprehensive search space as a tool to inform decisions about national EE plans. - Highlights: • A multiple objective approach to aid the choice of national energy efficiency plans. • A hybrid multi-objective MCDA model is proposed to search among the possible plans. • The model identified relevant plans according to five different idealized DMs. • The approach is tested with Portugal

  17. Quality Assurance Project Plan Development Tool

    Science.gov (United States)

    This tool contains information designed to assist in developing a Quality Assurance (QA) Project Plan that meets EPA requirements for projects that involve surface or groundwater monitoring and/or the collection and analysis of water samples.

  18. Towards future electricity networks - Final report

    Energy Technology Data Exchange (ETDEWEB)

    Papaemmanouil, A.

    2008-07-01

    This comprehensive final report for the Swiss Federal Office of Energy (SFOE) reviews work done on the development of new power transmission planning tools for restructured power networks. These are needed in order to face the challenges that arise due to economic, environmental and social issues. The integration of transmission, generation and energy policy planning in order to support a common strategy with respect to sustainable electricity networks is discussed. In the first phase of the project the main focus was placed on the definition of criteria and inputs that are most likely to affect sustainable transmission expansion plans. Models, concepts, and methods developed in order to study the impact of the internalisation of external costs in power production are examined. To consider external costs in the planning process, a concurrent software tool has been implemented that is capable of studying possible development scenarios. The report examines a concept that has been developed to identify congested transmission lines or corridors and evaluates the dependencies between the various market participants. The paper includes a set of three appendices that include a paper on the 28{sup th} USAEE North American conference, an abstract from Powertech 2009 and an SFOE report from July 2008.

  19. Towards future electricity networks - Final report

    International Nuclear Information System (INIS)

    Papaemmanouil, A.

    2008-01-01

    This comprehensive final report for the Swiss Federal Office of Energy (SFOE) reviews work done on the development of new power transmission planning tools for restructured power networks. These are needed in order to face the challenges that arise due to economic, environmental and social issues. The integration of transmission, generation and energy policy planning in order to support a common strategy with respect to sustainable electricity networks is discussed. In the first phase of the project the main focus was placed on the definition of criteria and inputs that are most likely to affect sustainable transmission expansion plans. Models, concepts, and methods developed in order to study the impact of the internalisation of external costs in power production are examined. To consider external costs in the planning process, a concurrent software tool has been implemented that is capable of studying possible development scenarios. The report examines a concept that has been developed to identify congested transmission lines or corridors and evaluates the dependencies between the various market participants. The paper includes a set of three appendices that include a paper on the 28 th USAEE North American conference, an abstract from Powertech 2009 and an SFOE report from July 2008.

  20. Decommissioning Plan for European Spallation Source

    Directory of Open Access Journals (Sweden)

    Ene Daniela

    2017-01-01

    Full Text Available This paper is a survey of the European Spallation Source initial decommissioning plan developed in compliance with Swedish Regulatory Authority requirements. The report outlines the decommissioning strategy selected and the baseline plan for decommissioning. Types and quantities of radioactive waste estimated to be generated at the final shut-down of the facility are further provided. The paper ends up with the analysis of the key elements of the decommissioning plan and the recommendations to the ESS management team..

  1. Intelligent Tools for Planning Knowledge base Development and Verification

    Science.gov (United States)

    Chien, Steve A.

    1996-01-01

    A key obstacle hampering fielding of AI planning applications is the considerable expense of developing, verifying, updating, and maintaining the planning knowledge base (KB). Planning systems must be able to compare favorably in terms of software lifecycle costs to other means of automation such as scripts or rule-based expert systems.

  2. Planning Innovation and Regional Development: the Spreading of Urban Strategic Planning in Southern Italy

    OpenAIRE

    Vinci, Ignazio

    2011-01-01

    For decades the Italian system of planning has been strongly characterized by a regulatory approach and the question of cities' development had been taken into account within general land use plans. In the 1990s this approach has been considered a strong constraint on the regeneration of cities and the revitalization of their economic potential. Therefore, in the last decade the improvement of flexibility and participation within planning processes were considered primary objectives both at r...

  3. Development of consensus treatment plans for juvenile localized scleroderma: a roadmap toward comparative effectiveness studies in juvenile localized scleroderma.

    Science.gov (United States)

    Li, Suzanne C; Torok, Kathryn S; Pope, Elena; Dedeoglu, Fatma; Hong, Sandy; Jacobe, Heidi T; Rabinovich, C Egla; Laxer, Ronald M; Higgins, Gloria C; Ferguson, Polly J; Lasky, Andrew; Baszis, Kevin; Becker, Mara; Campillo, Sarah; Cartwright, Victoria; Cidon, Michael; Inman, Christi J; Jerath, Rita; O'Neil, Kathleen M; Vora, Sheetal; Zeft, Andrew; Wallace, Carol A; Ilowite, Norman T; Fuhlbrigge, Robert C

    2012-08-01

    Juvenile localized scleroderma (LS) is a chronic inflammatory skin disorder associated with substantial morbidity and disability. Although a wide range of therapeutic strategies has been reported in the literature, a lack of agreement on treatment specifics and accepted methods for clinical assessment has made it difficult to compare approaches and identify optimal therapy. Our objective was to develop standardized treatment plans, clinical assessments, and response criteria for active, moderate to high severity juvenile LS. A core group of pediatric rheumatologists, dermatologists, and a lay advisor was engaged by the Childhood Arthritis and Rheumatology Research Alliance (CARRA) to develop standardized treatment plans and assessment parameters for juvenile LS using consensus methods/nominal group techniques. Recommendations were validated in 2 face-to-face conferences with a larger group of practitioners with expertise in juvenile LS and with the full membership of CARRA, which encompasses the majority of pediatric rheumatologists in the US and Canada. Consensus was achieved on standardized treatment plans that reflect the prevailing treatment practices of CARRA members. Standardized clinical assessment methods and provisional treatment response criteria were also developed. Greater than 90% of pediatric rheumatologists responding to a survey (66% of CARRA membership) affirmed the final recommendations and agreed to utilize these consensus plans to treat patients with juvenile LS. Using consensus methodology, we have developed standardized treatment plans and assessment methods for juvenile LS. The high level of support among pediatric rheumatologists will support future comparative effectiveness studies and enable the development of evidence-based guidelines for the treatment of juvenile LS. Copyright © 2012 by the American College of Rheumatology.

  4. U.S. LCI Database Project--Final Phase I Report

    Energy Technology Data Exchange (ETDEWEB)

    2003-08-01

    This Phase I final report reviews the process and provides a plan for the execution of subsequent phases of the database project, including recommended data development priorities and a preliminary cost estimate. The ultimate goal of the project is to develop publicly available LCI Data modules for commonly used materials, products, and processes.

  5. Tenneessee Valley Authority office of nuclear power management development plan

    International Nuclear Information System (INIS)

    Clements, L.L.

    1985-01-01

    The Tennessee Valley Authority's Management Development Plan is discussed and consists of an analysis of each managerial position, an analysis of each individual manager's and potential manager's qualifications and training and a comparison of the two. From this comparison two products are derived: a management replacement plan and an individual development plan for each nuclear employee. The process of the program is described in detail

  6. Quality assurance plan for placement of cold-cap grout, demonstration vault, Hanford Grout Vault Program. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Harrington, P.T.; Wakeley, L.D.; Ernzen, J.J.; Walley, D.M.

    1992-08-01

    During FY 91, the U.S. Army Engineer Waterways Experiment Station (WES) developed a grout to be used as a cold cap, a nonradioactive layer, between the solidified waste and the cover blocks of a demonstration waste disposal vault at the U.S. Department of Energy Hanford Facility. This document recommends requirements for a quality assurance (QA) plan for field mixing and placing of the cold-cap grout during final closure of the demonstration vault. Preplacement activities emphasize selection and testing of materials that will match the performance of materials used in the WES grout. Materials sources and applicable American Society of Testing and Materials, American Concrete Institute, and American Petroleum Institute specifications and requirements are provided. Archiving of physical samples of materials is essential, in addition to careful maintenance of test reports and laboratory data. Full-scale field trial mixing and a detailed preconstruction conference are recommended. Placement activities focus on production and placement of a grout that remains sufficiently constant throughout all batches and meets performance requirements. QA activities must be coordinated between the batch plant and delivery site. Recommended sampling during placement includes cylinders cast for subsequent tests of compressive strength and for nondestructive evaluation and prisms cast for monitoring volume stability. A minimum of two lifts is recommended. Postplacement activities include long-term monitoring of the properties of grout specimens cast during placement. Minimum testing of cylinders includes pulse velocity, fundamental frequency, and unconfined compressive strength. Monitoring characteristics of the microstructure also are recommended. The QA plan should designate an organization to have responsibility for maintaining complete records, reports, and archived samples, including details of deviations from plans written before field placement.

  7. Developing a strategic human resources plan for the Urban Angel.

    Science.gov (United States)

    Owen, Susan M

    2011-01-01

    In healthcare a significant portion of the budget is related to human resources. However, many healthcare organizations have yet to develop and implement a focused organizational strategy that ensures all human resources are managed in a way that best supports the successful achievement of corporate strategies. St. Michael's Hospital, in Toronto, Ontario, recognized the benefits of a strategic human resources management plan. During an eight-month planning process, St. Michael's Hospital undertook the planning for and development of a strategic human resources management plan. Key learnings are outlined in this paper.

  8. Development of telemetry for high-speed rotor instrumentation and monitoring: Final report

    Energy Technology Data Exchange (ETDEWEB)

    Mallick, G.T.; Nenno, P.N.; Parker, J.H.; Eckels, P.W.

    1987-06-01

    A modern data acquisition and telemetry system for rotating systems was developed as a part of a program, jointly funded by EPRI and Westinghouse, to develop a 300 MVA superconducting generator. While the overall program was terminated before completion, the telemetry development task was essentially complete at termination. It had been planned that the data acquisition and telemetry system was to be used in large scale models and the final 300 MVA rotor testing for transmitting sensor data from the rotating frame. An important part of this development was the qualification of a number of cryogenic sensors that were to be used in conjunction with the telemetry system for measuring temperature, strain and liquid helium level. The telemetry system that was developed handled the data transmission by digital frequency shift keying with a carrier of 200 kHz. The analog sensor signals were amplified and filtered ''on-board'' before being multiplexed and converted to a digital signal. All of this was under the control of a single chip microcomputer (Intel 8748) in the rotating frame. The overall sensor, data acquisition and telemetry system were operated and tested under rotation for a period of over one hundred hours. Overall, the system has proven itself to be reliable and effective. The present report covers all aspects of this development in detail, including the circuit and software design and performance. 27 refs., 58 figs.

  9. Final Report for X-ray Diffraction Sample Preparation Method Development

    Energy Technology Data Exchange (ETDEWEB)

    Ely, T. M. [Hanford Site (HNF), Richland, WA (United States); Meznarich, H. K. [Hanford Site (HNF), Richland, WA (United States); Valero, T. [Hanford Site (HNF), Richland, WA (United States)

    2018-01-30

    WRPS-1500790, “X-ray Diffraction Saltcake Sample Preparation Method Development Plan/Procedure,” was originally prepared with the intent of improving the specimen preparation methodology used to generate saltcake specimens suitable for XRD-based solid phase characterization. At the time that this test plan document was originally developed, packed powder in cavity supports with collodion binder was the established XRD specimen preparation method. An alternate specimen preparation method less vulnerable, if not completely invulnerable to preferred orientation effects, was desired as a replacement for the method.

  10. Regional power systems planning: a state of the art assessment. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1980-10-01

    The purpose of this report was to define regional power systems planning problems, the tools available and their shortcomings, and to document all of the above in a concise readable form. The approach consisted of a survey and literature search. The survey determined the tools being used by utilities, the tools they had rejected, and the tools they planned to try out. The literature search was conducted for the purpose of documenting the tools available, and performing a comparative analysis of these tools. The project included a mix of utility, university, and consulting organizations. Several organizations were consulted in the selection of the participants. A non-profit organization, The University of Oklahoma, was selected to manage the project. The results were reviewed in a series of four one day meetings by known authorities in each field. This report consists of the results of this project. Perhaps its major finding is that several aspects of the regional planning problem are not well defined, the roles of the various participants in regional planning is not clear, and certainly research is needed for the development of new methodology.

  11. Compact toroid development: activity plan for field reversed configurations

    International Nuclear Information System (INIS)

    1984-06-01

    This document contains the description, goals, status, plans, and approach for the investigation of the properties of a magnetic configuration for plasma confinement identified as the field reversed configuration (FRC). This component of the magnetic fusion development program has been characterized by its potential for physical compactness and a flexible range of output power. The included material represents the second phase of FRC program planning. The first was completed in February 1983, and was reported in DOE/ER-0160; Compact Toroid Development. This planning builds on that previous report and concentrates on the detailed plans for the next several years of the current DOE sponsored program. It has been deliberately restricted to the experimental and theoretical efforts possible within the present scale of effort. A third phase of this planning exercise will examine the subsequent effort and resources needed to achieve near term (1987 to 1990) FRC technical objectives

  12. Regional Development Planning in Ethiopia: Past Experience ...

    African Journals Online (AJOL)

    Regional Development Planning in Ethiopia: Past Experience, Current Initiatives and Future Prospects. ... Eastern Africa Social Science Research Review ... The main contention of the paper is that in the past, regional development, in line with the functional integration approach, was considered a national project.

  13. Megavoltage conebeam CT cine as final verification of treatment plan in lung stereotactic body radiotherapy

    International Nuclear Information System (INIS)

    Kudithipudi, Vijay; Gayou, Olivier; Colonias, Athanasios

    2016-01-01

    To analyse the clinical impact of megavoltage conebeam computed tomography (MV-CBCT) cine on internal target volume (ITV) coverage in lung stereotactic body radiotherapy (SBRT). One hundred and six patients received lung SBRT. All underwent 4D computed tomography simulation followed by treatment via image guided 3D conformal or intensity modulated radiation. Prior to SBRT, all patients underwent MV-CBCT cine, in which raw projections are displayed as beam's-eye-view fluoroscopic series with the planning target volume (PTV) projected onto each image, enabling verification of tumour motion relative to the PTV and assessment of adequacy of treatment margin. Megavoltage conebeam computed tomography cine was completed 1–2 days prior to SBRT. Four patients (3.8%) had insufficient ITV coverage inferiorly at cine review. All four plans were changed by adding 5 mm on the PTV margin inferiorly. The mean change in PTV volumes was 3.9 cubic centimetres (cc) (range 1.85–6.32 cc). Repeat cine was performed after plan modification to ensure adequate PTV coverage in the modified plans. PTV margin was adequate in the majority of patients with this technique. MV-CBCT cine did show insufficient coverage in a small subset of patients. Insufficient PTV margins may be a function of 4D CT simulation inadequacies or deficiencies in visualizing the ITV inferior border in the full-inhale phase. MV-CBCT cine is a valuable tool for final verification of PTV margins.

  14. A change navigation-based, scenario planning process within a developing world context from an Afro-centric leadership perspective

    Directory of Open Access Journals (Sweden)

    Chris A. Geldenhuys

    2011-02-01

    Research purpose: This study aimed to investigate how scenario-based planning (a strictly cognitive management tool can be combined with organisational change navigation (a practice addressing the emotionality of change and how this integrated process should be aligned with the prerequisites imposed by a developing country context and an Afro-centric leadership perspective in order to make the process more context relevant and aligned. Motivation for the study: The integration of organisational change navigation with conventional scenario based planning, as well as the incorporation of the perquisites of a developing countries and an Afro-centric leadership perspective, will give organisations a more robust, holistic strategic management tool that will add significantly more value within a rapidly, radically and unpredictably changing world. Research design, approach and method: The adopted research approach comprised a combination of the sourcing of the latest thinking in the literature (the ‘theory’ as well as the views of seasoned practitioners of scenario planning (the ‘practice’ through an iterative research process, moving between theory and practice, back to practice and finally returning to theory in order to arrive at a validated expanded and enhanced scenario-based planning process which is both theory and practice ‘proof’. Main findings: A management tool incorporating the change navigation and the unique features of developing countries and Afro-centric leadership was formulated and empirically validated. This management tool is referred to as a change navigation based, scenario planning process (CNBSPP. Practical/managerial implications: CNBSPP is available for use by organisations wishing to apply a strategic planning tool that fits within a developing country context and an Afro-centric leadership approach. Contribution/value add: The research makes a unique contribution to the current level of knowledge by integrating two disciplines

  15. Developing cancer control plans in Africa: examples from five countries.

    Science.gov (United States)

    Stefan, Daniela Cristina; Elzawawy, Ahmed M; Khaled, Hussein M; Ntaganda, Fabien; Asiimwe, Anita; Addai, Beatrice Wiafe; Wiafe, Seth; Adewole, Isaac F

    2013-04-01

    The creation and implementation of national cancer control plans is becoming increasingly necessary for countries in Africa, with the number of new cancer cases per year in the continent expected to reach up to 1·5 million by 2020. Examples from South Africa, Egypt, Nigeria, Ghana, and Rwanda describe the state of national cancer control plans and their implementation. Whereas in Rwanda the emphasis is on development of basic facilities needed for cancer care, in those countries with more developed economies, such as South Africa and Nigeria, the political will to fund national cancer control plans is limited, even though the plans exist and are otherwise well conceived. Improved awareness of the increasing burden of cancer and increased advocacy are needed to put pressure on governments to develop, fund, and implement national cancer control plans across the continent. Copyright © 2013 Elsevier Ltd. All rights reserved.

  16. Turnaround Operations Analysis for OTV. Volume 3: Technology Development Plan

    Science.gov (United States)

    1988-01-01

    An integrated technology development plan for the technologies required to process both GBOTVs and SBOTVs are described. The plan includes definition of the tests and experiments to be accomplished on the ground, in a Space Shuttle Sortie Mission, on an Expendable Launch Vehicle, or at the Space Station as a Technology Development Mission (TDM). The plan reflects and accommodates current and projected research and technology programs where appropriate.

  17. Beaufort Sea planning area oil and gas Lease Sale 170. Final environmental impact statement

    International Nuclear Information System (INIS)

    1998-02-01

    This environmental impact statement (EIS) assesses Lease Sale 170 proposed for August 1998 and comprised of 363 lease blocks in the Beaufort Sea planning area. The analysis addresses the significant environmental and socioeconomic concerns identified in the scoping process. Scoping consisted of input from State and Federal agencies, the petroleum industry, Native groups, environmental and public interest groups, and concerned individuals. The potential effects expected from the interaction between environmental resources and OCS-related activities were determined with respect to available scientific information and traditional knowledge. This EIS incorporates information from the Final EIS for the Beaufort Sea OCS Sale 144 (USD01, MMS, 1996a)

  18. Strategic Plan for Light Water Reactor Research and Development

    International Nuclear Information System (INIS)

    2004-01-01

    The purpose of this strategic plan is to establish a framework that will allow the Department of Energy (DOE) and the nuclear power industry to jointly plan the nuclear energy research and development (R and D) agenda important to achieving the Nation's energy goals. This strategic plan has been developed to focus on only those R and D areas that will benefit from a coordinated government/industry effort. Specifically, this plan focuses on safely sustaining and expanding the electricity output from currently operating nuclear power plants and expanding nuclear capacity through the deployment of new plants. By focusing on R and D at addresses the needs of both current and future nuclear plants, DOE and industry will be able to take advantage of the synergism between these two technology areas, thus improving coordination, enhancing efficiency, and further leveraging public and private sector resources. By working together under the framework of this strategic plan, DOE and the nuclear industry reinforce their joint commitment to the future use of nuclear power and the National Energy Policy's goal of expanding its use in the United States. The undersigned believe that a public-private partnership approach is the most efficient and effective way to develop and transfer new technologies to the marketplace to achieve this goal. This Strategic Plan is intended to be a living document that will be updated annually

  19. Environmental Development Plan: uranium mining, milling, and conversion

    International Nuclear Information System (INIS)

    1979-08-01

    This Environmental Development Plan (EDP) identifies the planning and management requirements and schedules needed to evaluate and assess the environmental, health, and safety (EH and S) aspects of the uranium mining, milling, and conversion technologies. The plan represents the collective perceptions of EH and S concerns and requirements and knowledge of ongoing research programs of most of the Federal agencies involved in significant EH and S R and D program management, standards setting, or regulatory activities associated with uranium mining, milling, and conversion

  20. Radioisotope thermoelectric generator transportation system subsystem 143 software development plan

    International Nuclear Information System (INIS)

    King, D.A.

    1994-01-01

    This plan describes the activities to be performed and the controls to be applied to the process of specifying, developing, and qualifying the data acquisition software for the Radioisotope Thermoelectric Generator (RTG) Transportation System Subsystem 143 Instrumentation and Data Acquisition System (IDAS). This plan will serve as a software quality assurance plan, a verification and validation (V and V) plan, and a configuration management plan

  1. ICT Strategic Planning for Mazandaran Province

    Directory of Open Access Journals (Sweden)

    Mohammad Reza Shojaie

    2012-02-01

    Full Text Available Today, regarding rapid changes in the environment, any organization, institution or country that overlooks its capabilities, strengths and weaknesses, will face real challenges. Strategic planning in organizations is a common response to these challenges which also facilitate achieving goals in an organization. Today, the importance of ICT is increased, which necessitates ICT strategic planning to use ICT in organizations. So, this study aimed to propose ICT strategic plans for Mazandaran province. For this end, at first using stakeholders' viewpoints, the vision, mission and goals are provided. Then, Internal & External Matrix was suggested and identified factors were ranked using Analytic Network Processing (ANP. Then, concerning strengths, weaknesses, opportunities, threats, and using SWOT analysis, ICT strategies were provided. Finally, using QSPM matrix, the strategies were ranked. Regarding this ranking, dedicated budget to ICT in governmental organizations, using integration architecture, developing organizational and inter-organizational information systems, developing mechanisms to absorb national and local financial resources for extending ICT infrastructures and finally concerning ICT trainings for managers and people, were in the top of the list.

  2. Planning Cultures and Histories: Influences on the Evolution of Planning Systems and Spatial Development Patterns

    NARCIS (Netherlands)

    Stead, D.; de Vries, J.; Tasan-Kok, T.

    2015-01-01

    This special issue addresses the influences of planning cultures and histories on the evolution of planning systems and spatial development. As well as providing an international comparative perspective on these issues, the collection of articles also engages in a search for new conceptual

  3. Development Plan of the Sub sector Coal 1997, 2005

    International Nuclear Information System (INIS)

    1996-11-01

    This third version of the Development Plan of the Sub-sector Coal, subsequent to the editions of 1994 and 1995, it not only obeys the initial purpose of upgrading the plan annually, but to that, there being it conceived from a principle as an indicative and dynamic plan, they have happened circumstances, such as new laws and regulations, changes in the national and international market, variations in the energy politics of the country and other that force to their upgrade. The plan, although it maintains the general structure of the previous versions, fixed as planning Bureau horizon the year 2005, and it contemplates some actions to advance on the part of the State, represented by Ecocarbon. They settle down this way, strategic objectives for each one of their programs that they should be translated in the achievement of the end enunciated in the precedent paragraph. As the achievement of the auto- sustainability of the mining in the proposed term cannot be reached without the participation and the commitment of the private sector that it is the main actor in the development of the industry, the plan it includes an agreement of commitment, signed by authorized representatives guided to the achievement of the looked for objective. It is clear that, to reach the enunciated objective, a permanent evaluation of the goals, the planning bureau of the sub-sector is needed it should stay, looking for the participation of the carboniferous private sector to reach a progressive development of the mining of the coal and of the industry in general

  4. Planning Mechanisms for Regional Electric Power Supply System Development

    Directory of Open Access Journals (Sweden)

    Evgeniy Anatolyevich Malyshev

    2015-12-01

    Full Text Available Key problems of the regional electric power supply systems are examined. These problems result from a lack of regulated interaction mechanisms for uniting the different entities’ resources aimed at the realization of investment activities. One of the main problems of the power supply industry is physical and moral aging of both generating and networking equipment. In the article, the necessity of management system formation to control the development of power sector has been proved. The deficiencies of the modern investment procedure in power companies are described. The absence of continuity between the regional and local strategic planning documents and investment planning of a power company has been found out. The possibility to develop a new mechanism for attracting investment has been proposed. The regulation of joint activities to implement the development program for the regional power supply industry has been proposed. The management system to develop the Russian power industry has been proposed. The comparative analysis of generating capacity development mechanisms has been carried out, such as capacity supply agreement (CSA, investment support mechanism (ISM, and long-term power market (LPM. The interaction procedure of the planning of the power supply infrastructure development has been described. The mechanism connecting the state sectoral and regional planning and corporate planning of power supply infrastructure development has been proposed. The regional aspects of industrial policy and its legislative support have been considered. To successfully implement the public-private-partnership (PPP projects, it is necessary to create the effective PPP model within the federal and regional legislation framework; to develop the financial model providing the recoverability of investments; to provide a mutually beneficial cooperation between executive bodies and private investors. The possibility to apply the PPP mechanism for regional

  5. Designing a strategic plan development approach for integrated area development projects

    NARCIS (Netherlands)

    de Kort, Inge

    2009-01-01

    Increasingly, it has become evident that spatial problems can no longer be resolved in isolation, but should be solved in conjunction with other development-related issues. Interest in integrated area development is growing, and a more integrated planning approach is desired. In this design-based

  6. IEA Implementing Agreement on Electricity Networks Analysis, Research and Development (ENARD) Annex IV: - Transmission Systems Final report

    Energy Technology Data Exchange (ETDEWEB)

    Uhlen, Kjetil; Cirio, Diego

    2012-11-01

    This is the final report from Annex IV under the IEA Implementing Agreement on Electricity Networks Analysis, Research and Development (ENARD). The Annex has worked out a long-term perspective in the evolution of transmission system planning and operation. This is motivated by the established targets for energy system developments, which in turn are affected by economic paradigms, environmental concerns, and security of supply requirements for the well-being of citizens. The Annex work concludes that urgent action is needed to make the power system able to accommodate in a safe and economic way the dramatic changes it is required to undergo. A main message is that the 'right' investment in transmission capacity, which must be stimulated, may be regarded as 'overinvestment'. Transmission lines may be 'necessary' even though there is a chance that they may be underutilised in parts of their lifetime. In reality, underinvestment could be more costly than overinvestment (contradictory to the motivation for deregulation; to improve efficiency and avoid overinvestment). This is necessary, taking into account the very long planning and consenting processes and accounting for the technical aspects in the regulatory and market framework.(auth)

  7. RTSTEP regional transportation simulation tool for emergency planning - final report.

    Energy Technology Data Exchange (ETDEWEB)

    Ley, H.; Sokolov, V.; Hope, M.; Auld, J.; Zhang, K.; Park, Y.; Kang, X. (Energy Systems)

    2012-01-20

    Large-scale evacuations from major cities during no-notice events - such as chemical or radiological attacks, hazardous material spills, or earthquakes - have an obvious impact on large regions rather than on just the directly affected area. The scope of impact includes the accommodation of emergency evacuation traffic throughout a very large area; the planning of resources to respond appropriately to the needs of the affected population; the placement of medical supplies and decontamination equipment; and the assessment and determination of primary escape routes, as well as routes for incoming emergency responders. Compared to events with advance notice, such as evacuations based on hurricanes approaching an affected area, the response to no-notice events relies exclusively on pre-planning and general regional emergency preparedness. Another unique issue is the lack of a full and immediate understanding of the underlying threats to the population, making it even more essential to gain extensive knowledge of the available resources, the chain of command, and established procedures. Given the size of the area affected, an advanced understanding of the regional transportation systems is essential to help with the planning for such events. The objectives of the work described here (carried out by Argonne National Laboratory) is the development of a multi-modal regional transportation model that allows for the analysis of different evacuation scenarios and emergency response strategies to build a wealth of knowledge that can be used to develop appropriate regional emergency response plans. The focus of this work is on the effects of no-notice evacuations on the regional transportation network, as well as the response of the transportation network to the sudden and unusual demand. The effects are dynamic in nature, with scenarios changing potentially from minute to minute. The response to a radiological or chemical hazard will be based on the time-delayed dispersion of

  8. Solid waste management complex site development plan

    International Nuclear Information System (INIS)

    Greager, T.M.

    1994-01-01

    The main purpose of this Solid Waste Management Complex Site Development Plan is to optimize the location of future solid waste treatment and storage facilities and the infrastructure required to support them. An overall site plan is recommended. Further, a series of layouts are included that depict site conditions as facilities are constructed at the SWMC site. In this respect the report serves not only as the siting basis for future projects, but provides siting guidance for Project W-112, as well. The plan is intended to function as a template for expected growth of the site over the next 30 years so that future facilities and infrastructure will be properly integrated

  9. Solid waste management complex site development plan

    Energy Technology Data Exchange (ETDEWEB)

    Greager, T.M.

    1994-09-30

    The main purpose of this Solid Waste Management Complex Site Development Plan is to optimize the location of future solid waste treatment and storage facilities and the infrastructure required to support them. An overall site plan is recommended. Further, a series of layouts are included that depict site conditions as facilities are constructed at the SWMC site. In this respect the report serves not only as the siting basis for future projects, but provides siting guidance for Project W-112, as well. The plan is intended to function as a template for expected growth of the site over the next 30 years so that future facilities and infrastructure will be properly integrated.

  10. Computerized radiation treatment planning

    International Nuclear Information System (INIS)

    Laarse, R. van der.

    1981-01-01

    Following a general introduction, a chain consisting of three computer programs which has been developed for treatment planning of external beam radiotherapy without manual intervention is described. New score functions used for determination of optimal incidence directions are presented and the calculation of the position of the isocentre for each optimum combination of incidence directions is explained. A description of how a set of applicators, covering fields with dimensions of 4 to 20 cm, for the 6 to 20 MeV electron beams of a MEL SL75-20 linear accelerator was developed, is given. A computer program for three dimensional electron beam treatment planning is presented. A microprocessor based treatment planning system for the Selectron remote controlled afterloading system for intracavitary radiotherapy is described. The main differences in treatment planning procedures for external beam therapy with neutrons instead of photons is discussed. A microprocessor based densitometer for plotting isodensity lines in film dosimetry is described. A computer program for dose planning of brachytherapy is presented. Finally a general discussion about the different aspects of computerized treatment planning as presented in this thesis is given. (Auth.)

  11. Final Technical Report: Development of Post-Installation Monitoring Capabilities

    Energy Technology Data Exchange (ETDEWEB)

    Polagye, Brian [University of Washington

    2014-03-31

    The development of approaches to harness marine and hydrokinetic energy at large-scale is predicated on the compatibility of these generation technologies with the marine environment. At present, aspects of this compatibility are uncertain. Demonstration projects provide an opportunity to address these uncertainties in a way that moves the entire industry forward. However, the monitoring capabilities to realize these advances are often under-developed in comparison to the marine and hydrokinetic energy technologies being studied. Public Utility District No. 1 of Snohomish County has proposed to deploy two 6-meter diameter tidal turbines manufactured by OpenHydro in northern Admiralty Inlet, Puget Sound, Washington. The goal of this deployment is to provide information about the environmental, technical, and economic performance of such turbines that can advance the development of larger-scale tidal energy projects, both in the United States and internationally. The objective of this particular project was to develop environmental monitoring plans in collaboration with resource agencies, while simultaneously advancing the capabilities of monitoring technologies to the point that they could be realistically implemented as part of these plans. In this, the District was joined by researchers at the Northwest National Marine Renewable Energy Center at the University of Washington, Sea Mammal Research Unit, LLC, H.T. Harvey & Associates, and Pacific Northwest National Laboratory. Over a two year period, the project team successfully developed four environmental monitoring and mitigation plans that were adopted as a condition of the operating license for the demonstration project that issued by the Federal Energy Regulatory Commission in March 2014. These plans address nearturbine interactions with marine animals, the sound produced by the turbines, marine mammal behavioral changes associated with the turbines, and changes to benthic habitat associated with colonization

  12. Developing nursing care plans.

    Science.gov (United States)

    Ballantyne, Helen

    2016-02-24

    This article aims to enhance nurses' understanding of nursing care plans, reflecting on the past, present and future use of care planning. This involves consideration of the central theories of nursing and discussion of nursing models and the nursing process. An explanation is provided of how theories of nursing may be applied to care planning, in combination with clinical assessment tools, to ensure that care plans are context specific and patient centred.

  13. Study on DSM-based task planning of product cooperative development

    Institute of Scientific and Technical Information of China (English)

    Jiang Zengqiang; Liu Mingzhou; Zhao Han; Ge Maogen; Guo Jia

    2008-01-01

    The results of analyzing the managerial characteristics and complexity of product cooperative development suggest that task planning is an important aspect for process management of product cooperative development and the method for planning tasks should be able to model the dependency between tasks and iterations during the development process. In this paper, a DSM-based method and its corresponding optimization algorithms are developed. At first the coupled task sets and uncoupled task sets are identified, and the tasks are then optimized by the corresponding algorithms. The optimal tasks plan will reduce the development time and cost. Considering the practical requirements in real world, a Multilayer DSM is proposed, and its information communication techniques between DSM and traversing principle are described in details.

  14. Geospatial Based Information System Development in Public Administration for Sustainable Development and Planning in Urban Environment

    Science.gov (United States)

    Kouziokas, Georgios N.

    2016-09-01

    It is generally agreed that the governmental authorities should actively encourage the development of an efficient framework of information and communication technology initiatives so as to advance and promote sustainable development and planning strategies. This paper presents a prototype Information System for public administration which was designed to facilitate public management and decision making for sustainable development and planning. The system was developed by using several programming languages and programming tools and also a Database Management System (DBMS) for storing and managing urban data of many kinds. Furthermore, geographic information systems were incorporated into the system in order to make possible to the authorities to deal with issues of spatial nature such as spatial planning. The developed system provides a technology based management of geospatial information, environmental and crime data of urban environment aiming at improving public decision making and also at contributing to a more efficient sustainable development and planning.

  15. Decentralized Development Planning and Fragmentation of ...

    African Journals Online (AJOL)

    Using the Greater Accra Metropolitan Area (GAMA) as a case study, this paper argues that the proliferation of autonomous local government areas within the context of urban sprawl and other challenges have inhibited metropolitan-wide development planning. Keywords: Decentralization; local government; urban growth; ...

  16. Responding to the World Health Organization Global Disability Action Plan in Egypt: A Technical Consultancy to develop a National Disability, Health and Rehabilitation Plan.

    Science.gov (United States)

    Gutenbrunner, Christoph; Nugraha, Boya

    2018-04-18

    A technical consultation to develop a National Disability, Health and Rehabilitation Plan (NDHRP) for Egypt was carried out in 2015. Its overall goal was to improve health, functioning, well-being, quality of life, and participation of persons with disability in Egypt by supporting the Ministry of Health and Population and other stakeholders to improve access to health services and strengthen health-related rehabilitation services for all persons in need. The methodological steps of the technical consultation were as follows: collecting and reviewing accessible documents and data; site visits to state institutions, health and rehabilitation services; discussions with relevant stakeholders in rehabilitation, including persons with disability; drafting recommendations based on the principles of the World Report on Disability and the World Health Organization Global Disability Action Plan and the information collected; discussion with stakeholders in a workshop; and preparation of a final report. The development of a NDHRP was successful and led to recommendations with a good level of consensus among stakeholders in Egypt. The authors hope that the NDHRP will lead to improved rehabilitation service provision, and health and quality of life of persons with disability and chronic health conditions living in Egypt.

  17. Regional planning and urban infrastructure development in the ...

    African Journals Online (AJOL)

    Regional planning and urban infrastructure development in the Gongola region, ... PROMOTING ACCESS TO AFRICAN RESEARCH ... In North-eastern Nigeria, the Gongola region has been one of the least developed since independence.

  18. Final Report for the Soboba Strategic Tribal Energy Planning Project

    Energy Technology Data Exchange (ETDEWEB)

    Miller, Kim [EPA Specialist

    2013-09-17

    In 2011 the Tribe was awarded funds from the Department of Energy to formulate the Soboba Strategic Tribal Energy Plan. This will be a guiding document used throughout the planning of projects focused on energy reduction on the Reservation. The Soboba Strategic Tribal Energy Plan's goal is to create a Five Year Energy Plan for the Soboba Band of Luiseno Indians in San Jacinto, California. This plan will guide the decision making process towards consistent progress leading to the Tribal goal of a 25% reduction in energy consumption in the next five years. It will additionally outline energy usage/patterns and will edentify areas the Tribe can decrease energy use and increase efficiency. The report documents activities undertaken under the grant, as well as incldues the Tribe's strategif energy plan.

  19. Increasing Organizational Effectiveness through Better Human Resource Planning and Development

    Science.gov (United States)

    Schein, Edgar H.

    1977-01-01

    Discusses the increasing importance of human resource planning and development for organizational effectiveness, and examines how the major components of a human resource planning and development system should be coordinated for maximum effectiveness. Available from Alfred P. Sloan School of Management, Massachusetts Institute of Technology,…

  20. Research and development plan for the Slagging Pyrolysis Incinerator

    International Nuclear Information System (INIS)

    Hedahl, T.G.; McCormack, M.D.

    1979-01-01

    Objective is to develop an incinerator for processing disposed transuranium waste. This R and D plan describes the R and D efforts required to begin conceptual design of the Slagging Pyrolysis Incinerator (Andco-Torrax). The program includes: incinerator, off-gas treatment, waste handling, instrumentation, immobilization analyses, migration studies, regulations, Belgium R and D test plan, Disney World test plan, and remote operation and maintenance

  1. Megavoltage conebeam CT cine as final verification of treatment plan in lung stereotactic body radiotherapy.

    Science.gov (United States)

    Kudithipudi, Vijay; Gayou, Olivier; Colonias, Athanasios

    2016-06-01

    To analyse the clinical impact of megavoltage conebeam computed tomography (MV-CBCT) cine on internal target volume (ITV) coverage in lung stereotactic body radiotherapy (SBRT). One hundred and six patients received lung SBRT. All underwent 4D computed tomography simulation followed by treatment via image guided 3D conformal or intensity modulated radiation. Prior to SBRT, all patients underwent MV-CBCT cine, in which raw projections are displayed as beam's-eye-view fluoroscopic series with the planning target volume (PTV) projected onto each image, enabling verification of tumour motion relative to the PTV and assessment of adequacy of treatment margin. Megavoltage conebeam computed tomography cine was completed 1-2 days prior to SBRT. Four patients (3.8%) had insufficient ITV coverage inferiorly at cine review. All four plans were changed by adding 5 mm on the PTV margin inferiorly. The mean change in PTV volumes was 3.9 cubic centimetres (cc) (range 1.85-6.32 cc). Repeat cine was performed after plan modification to ensure adequate PTV coverage in the modified plans. PTV margin was adequate in the majority of patients with this technique. MV-CBCT cine did show insufficient coverage in a small subset of patients. Insufficient PTV margins may be a function of 4D CT simulation inadequacies or deficiencies in visualizing the ITV inferior border in the full-inhale phase. MV-CBCT cine is a valuable tool for final verification of PTV margins. © 2016 The Royal Australian and New Zealand College of Radiologists.

  2. Decommissioning Planning during the Operation of the Loviisa NPP. Planning, Management and Organizational Aspects

    Energy Technology Data Exchange (ETDEWEB)

    Tuunanen, J. P.; Eurajoki, T. E.E., [Fortum Power and Heat Ltd, Nuclear Waste Espoo (Finland)

    2013-08-15

    The first decommissioning plan for Loviisa nuclear power plant was written already in 1980's, when the plant had just started operation. The plan has been updated in 5-6 years intervals and this work still continues towards the final decommissioning plan. The decommissioning plan is based on immediate dismantling option and final disposal of decommissioning waste to the extension of the on site final disposal facility for low and intermediate level waste. The decommissioning planning has been organized as an independent project, which is realised in close cooperation with Fortum's research programme on radioactive waste management. The plant personnel are involved in the planning work through providing operating experience on contamination and activation of systems, structures and components. Later in the decommissioning phase the plant personnel will form the main part of the decommissioning organization. (author)

  3. 78 FR 26616 - Draft NOAA Five Year Research and Development Plan

    Science.gov (United States)

    2013-05-07

    ... DEPARTMENT OF COMMERCE Draft NOAA Five Year Research and Development Plan AGENCY: National Oceanic and Atmospheric Administration (NOAA), Department of Commerce (DOC). ACTION: Draft NOAA Five Year Research and Development Plan for Public Review. SUMMARY: NOAA's draft Five Year Research and Development...

  4. Innovative Technology Development Program. Final summary report

    International Nuclear Information System (INIS)

    Beller, J.

    1995-08-01

    Through the Office of Technology Development (OTD), the U.S. Department of Energy (DOE) has initiated a national applied research, development, demonstration, testing, and evaluation program, whose goal has been to resolve the major technical issues and rapidly advance technologies for environmental restoration and waste management. The Innovative Technology Development (ITD) Program was established as a part of the DOE, Research, Development, Demonstration, Testing, and Evaluation (RDDT ampersand E) Program. The plan is part of the DOE's program to restore sites impacted by weapons production and to upgrade future waste management operations. On July 10, 1990, DOE issued a Program Research and Development Announcement (PRDA) through the Idaho Operations Office to solicit private sector help in developing innovative technologies to support DOE's clean-up goals. This report presents summaries of each of the seven projects, which developed and tested the technologies proposed by the seven private contractors selected through the PRDA process

  5. Demographic, Employment and Development Trends: The Need for Integrated Planning.

    Science.gov (United States)

    Farooq, Ghazi M.; MacKellar, F. Landis

    1990-01-01

    The authors contend that problems associated with rapid population growth in developing countries must be tackled through comprehensive planning. They discuss impacts of demography on labor supply and demand and migration. Then they propose a practical framework for population and human resource development planning and policy formation. (SK)

  6. Burlington Bottoms Wildlife Mitigation Project. Final Environmental Assessment/Management Plan and Finding of No Significant Impact.

    Energy Technology Data Exchange (ETDEWEB)

    1994-12-01

    Bonneville Power Administration (BPA) proposes to fund wildlife management and enhancement activities for the Burlington bottoms wetlands mitigation site. Acquired by BPA in 1991, wildlife habitat at Burlington bottoms would contribute toward the goal of mitigation for wildlife losses and inundation of wildlife habitat due to the construction of Federal dams in the lower Columbia and Willamette River Basins. Target wildlife species identified for mitigation purposes are yellow warbler, great blue heron, black-capped chickadee, red-tailed hawk, valley quail, spotted sandpiper, wood duck, and beaver. The Draft Management Plan/Environmental Assessment (EA) describes alternatives for managing the Burlington Bottoms area, and evaluates the potential environmental impacts of the alternatives. Included in the Draft Management Plan/EA is an implementation schedule, and a monitoring and evaluation program, both of which are subject to further review pending determination of final ownership of the Burlington Bottoms property.

  7. Burlington Bottoms Wildlife Mitigation Project. Final environmental assessment/management plan and finding of no significant impact

    International Nuclear Information System (INIS)

    1994-12-01

    Bonneville Power Administration (BPA) proposes to fund wildlife management and enhancement activities for the Burlington bottoms wetlands mitigation site. Acquired by BPA in 1991, wildlife habitat at Burlington bottoms would contribute toward the goal of mitigation for wildlife losses and inundation of wildlife habitat due to the construction of Federal dams in the lower Columbia and Willamette River Basins. Target wildlife species identified for mitigation purposes are yellow warbler, great blue heron, black-capped chickadee, red-tailed hawk, valley quail, spotted sandpiper, wood duck, and beaver. The Draft Management Plan/Environmental Assessment (EA) describes alternatives for managing the Burlington Bottoms area, and evaluates the potential environmental impacts of the alternatives. Included in the Draft Management Plan/EA is an implementation schedule, and a monitoring and evaluation program, both of which are subject to further review pending determination of final ownership of the Burlington Bottoms property

  8. Strategic planning and security analysis

    International Nuclear Information System (INIS)

    DePasquale, S.

    1991-01-01

    Nuclear security master planning is a deliberative process, founded on the premise that the broad scope of security must be analyzed before any meaningful determinations may be reached on an individual security aspect. This paper examines the analytical process required in developing a Security Master Plan. It defines a four stage process concluding with the selection of security measures encompassing physical security, policy and procedure considerations and guard force deployment. The final product orchestrates each security measure in a complementary and supportive configuration

  9. Study on DSM-based task planning of product cooperative development

    Institute of Scientific and Technical Information of China (English)

    2008-01-01

    The results of analyzing the managerial characteristics and complexity of product cooperative development suggest that task planning is an important aspect for process management of product cooperative development and the method for planning tasks should be able to model the dependency between tasks and iterations during the development process. In this paper, a DSM-based method and its corresponding optimization algorithms are developed. At first the coupled task sets and uncoupled task sets are identified...

  10. Evidence development and publication planning: strategic process.

    Science.gov (United States)

    Wittek, Michael R; Jo Williams, Mary; Carlson, Angeline M

    2009-11-01

    A number of decisions in the health care field rely heavily on published clinical evidence. A systematic approach to evidence development and publication planning is required to develop a portfolio of evidence that includes at minimum information on efficacy, safety, durability of effect, quality of life, and economic outcomes. The approach requires a critical assessment of available literature, identification of gaps in the literature, and a strategic plan to fill the gaps to ensure the availability of evidence demanded for clinical decisions, coverage/payment decisions and health technology assessments. The purpose of this manuscript is to offer a six-step strategic process leading to a portfolio of evidence that meets the informational needs of providers, payers, and governmental agencies concerning patient access to a therapy.

  11. Hazardous Waste Development, Demonstration, and Disposal (HAZWDDD) program plan: Executive summary

    International Nuclear Information System (INIS)

    McGinnis, C.P.; Eisenhower, B.M.; Reeves, M.E.; DePaoli, S.M.; Stinton, L.H.; Harrington, E.H.

    1989-02-01

    The Hazardous Waste Development, Demonstration, and Disposal (HAZWDDD) Program Plan provides a strategy for management of hazardous and mixed wastes generated by the five Department of Energy (DOE) installations managed by Martin Marietta Energy Systems, Inc. (Energy Systems). This integrated corporate plan is based on the individual installation plans, which identify waste streams, facility capabilities, problem wastes, future needs, and funding needs. Using this information, the corporate plan identifies common concerns and technology/facility needs over the next 10 years. The overall objective of this corporate plan is to ensure that treatment, storage, and disposal (TSD) needs for all hazardous and mixed wastes generated by Energy Systems installations have been identified and planned for. Specific objectives of the program plan are to (1) identify all hazardous and mixed waste streams; (2) identify hazardous and mixed waste TSD requirements; (3) identify any unresolved technical issues preventing implementation of the strategy; (4) develop schedules for studies, demonstrations, and facilities to resolve the issues; and (5) define the interfaces with the Low-Level Waste Disposal Development and Demonstration (LLWDDD) Program. 10 refs., 7 figs

  12. 2016 Federal Cybersecurity Research and Development Strategic Plan

    Data.gov (United States)

    Networking and Information Technology Research and Development, Executive Office of the President — As part of the Presidents Cybersecurity National Action Plan (CNAP), the Administration released the 2016 Federal Cybersecurity Research and Development Strategic...

  13. Health workforce development planning in the Sultanate of Oman: a case study

    Directory of Open Access Journals (Sweden)

    Ghosh Basu

    2009-06-01

    Full Text Available Abstract Introduction Oman's recent experience in health workforce development may be viewed against the backdrop of the situation just three or four decades ago, when it had just a few physicians and nurses (mostly expatriate. All workforce categories in Oman have grown substantially over the last two decades. Increased self-reliance was achieved despite substantial growth in workforce stocks. Stocks of physicians and nurses grew significantly during 1985–2007. This development was the outcome of well-considered national policies and plans. This case outlines how Oman is continuing to turn around its excessive dependence on expatriate workforce through strategic workforce development planning. Case description The Sultanate's early development initiatives focused on building a strong health care infrastructure by importing workforce. However, the policy-makers stressed national workforce development for a sustainable future. Beginning with the formulation of a strategic health workforce development plan in 1991, the stage was set for adopting workforce planning as an essential strategy for sustainable health development and workforce self-reliance. Oman continued to develop its educational infrastructure, and began to produce as much workforce as possible, in order to meet health care demands and achieve workforce self-reliance. Other policy initiatives with a beneficial impact on Oman's workforce development scenario were: regionalization of nursing institutes, active collaboration with universities and overseas specialty boards, qualitative improvement of the education system, development of a strong continuing professional development system, efforts to improve workforce management, planned change management and needs-based micro/macro-level studies. Strong political will and bold policy initiatives, dedicated workforce planning and educational endeavours have all contributed to help Oman to develop its health workforce stocks and gain

  14. Health workforce development planning in the Sultanate of Oman: a case study.

    Science.gov (United States)

    Ghosh, Basu

    2009-06-11

    Oman's recent experience in health workforce development may be viewed against the backdrop of the situation just three or four decades ago, when it had just a few physicians and nurses (mostly expatriate). All workforce categories in Oman have grown substantially over the last two decades. Increased self-reliance was achieved despite substantial growth in workforce stocks. Stocks of physicians and nurses grew significantly during 1985-2007. This development was the outcome of well-considered national policies and plans. This case outlines how Oman is continuing to turn around its excessive dependence on expatriate workforce through strategic workforce development planning. The Sultanate's early development initiatives focused on building a strong health care infrastructure by importing workforce. However, the policy-makers stressed national workforce development for a sustainable future. Beginning with the formulation of a strategic health workforce development plan in 1991, the stage was set for adopting workforce planning as an essential strategy for sustainable health development and workforce self-reliance. Oman continued to develop its educational infrastructure, and began to produce as much workforce as possible, in order to meet health care demands and achieve workforce self-reliance. Other policy initiatives with a beneficial impact on Oman's workforce development scenario were: regionalization of nursing institutes, active collaboration with universities and overseas specialty boards, qualitative improvement of the education system, development of a strong continuing professional development system, efforts to improve workforce management, planned change management and needs-based micro/macro-level studies. Strong political will and bold policy initiatives, dedicated workforce planning and educational endeavours have all contributed to help Oman to develop its health workforce stocks and gain self-reliance. Oman has successfully innovated workforce

  15. Spent nuclear fuel project integrated schedule plan

    International Nuclear Information System (INIS)

    Squires, K.G.

    1995-01-01

    The Spent Nuclear Fuel Integrated Schedule Plan establishes the organizational responsibilities, rules for developing, maintain and status of the SNF integrated schedule, and an implementation plan for the integrated schedule. The mission of the SNFP on the Hanford site is to provide safe, economic, environmentally sound management of Hanford SNF in a manner which stages it to final disposition. This particularly involves K Basin fuel

  16. Spent nuclear fuel project integrated schedule plan

    Energy Technology Data Exchange (ETDEWEB)

    Squires, K.G.

    1995-03-06

    The Spent Nuclear Fuel Integrated Schedule Plan establishes the organizational responsibilities, rules for developing, maintain and status of the SNF integrated schedule, and an implementation plan for the integrated schedule. The mission of the SNFP on the Hanford site is to provide safe, economic, environmentally sound management of Hanford SNF in a manner which stages it to final disposition. This particularly involves K Basin fuel.

  17. Milestones in Language Planning and Development Aid

    Science.gov (United States)

    Coleman, Hywel

    2017-01-01

    This paper tracks the changing relationships between language planning and development aid over a period of 70 years from the end of the Second World War to the present day. Drawing on documentary resources--in particular, the published proceedings of the Language and Development Conferences (LDCs)--the paper identifies a number of significant…

  18. Document status for 1 and 2 Kozloduy NPP decommissioning activities -Phase 'Final Shutdown'

    International Nuclear Information System (INIS)

    Vangev, A.; Boyadjiev, Z.

    1997-01-01

    Decommissioning process (D and D) is the final phase of each nuclear reactor life cycle. The first nuclear reactor generation has reached his expiration life date. Decommissioning working documentation had not been taken into account at the project and construction stage. The decommissioning activities, planning and legislation has to develop along their operation. Most of developed nuclear energetic countries have gathered good experience and have create their own decommissioning strategy. This report represents in brief an overview of different country's approaches and the Kozloduy NPP decommissioning activity intention in near future and reviews the D and D working document status for 1 and 2 Kozloduy NPP Units decommissioning. Kozloduy NPP D and D task to the moment is to plan the first stage of the decommissioning process - 'The Final Shutdown' and to prepare the working documents for the phase execution. The Final Shutdown of Kozloduy NPP - 1 is the termination of operation of the Units 1 and 2 and the electricity production cessation after their useful life exhaust. In accordance with the legal legislation in Bulgaria only the normal planned termination of operation on units 1 and 2 should be prescribed. The project results concern the initial condition of the equipment and systems, their preparation and sequence for defueling, decontamination and dismantling. A plan for activities' organization for D and D and Complex Characterization of the Site under consideration will contain the following documents: 1. Time-schedule for the sequence of activities during the stages of the Final Shutdown and Safe Enclosure preparation. Technical project for organization of work related to Final Shutdown; 2. Complex Characterization Programme for a condition investigation of the Units 1 and 2 equipment and systems. 3. Technical project for design modifications and dismantling of equipment and systems which violate the radiation and nuclear safety during the Final Shutdown

  19. An Asset-Based Approach to Tribal Community Energy Planning

    Energy Technology Data Exchange (ETDEWEB)

    Gutierrez, Rachael A. [Pratt Inst., Brooklyn, NY (United States). City and Regional Planning; Martino, Anthony [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Materials, Devices, and Energy Technologies; Begay, Sandra K. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Materials, Devices, and Energy Technologies

    2016-08-01

    Community energy planning is a vital component of successful energy resource development and project implementation. Planning can help tribes develop a shared vision and strategies to accomplish their energy goals. This paper explores the benefits of an asset-based approach to tribal community energy planning. While a framework for community energy planning and federal funding already exists, some areas of difficulty in the planning cycle have been identified. This paper focuses on developing a planning framework that offsets those challenges. The asset-based framework described here takes inventory of a tribe’s capital assets, such as: land capital, human capital, financial capital, and political capital. Such an analysis evaluates how being rich in a specific type of capital can offer a tribe unique advantages in implementing their energy vision. Finally, a tribal case study demonstrates the practical application of an asset-based framework.

  20. Action Plan for the Development of Civic Morality

    Science.gov (United States)

    Chinese Education and Society, 2006

    2006-01-01

    This paper discusses the action plan for the development of civic morality. Here, the importance, substance, ideology and policy principles guiding the development of civic morality is elaborated. In order to strengthen the development of civic morality, it is a must to adapt to the requirements of the developing situation; seize good…

  1. Task Analysis and Descriptions of Required Job Competencies for Robotics/Automated Systems Technicians. Final Report. Volume 2. Curriculum Planning Guide.

    Science.gov (United States)

    Hull, Daniel M.; Lovett, James E.

    This volume of the final report for the Robotics/Automated Systems Technician (RAST) curriculum project is a curriculum planning guide intended for school administrators, faculty, and student counselors/advisors. It includes step-by-step procedures to help institutions evaluate their community's needs and their capabilities to meet these needs in…

  2. DWPF Development Plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Holtzscheiter, E.W.

    1994-05-09

    The DWPF Development Plan is based on an evaluation process flowsheet and related waste management systems. The scope is shown in Figure 1 entitled ``DWPF Process Development Systems.`` To identify the critical development efforts, each system has been analyzed to determine: The identification of unresolved technology issues. A technology issue (TI) is one that requires basic development to resolve a previously unknown process or equipment problem and is managed via the Technology Assurance Program co-chaired by DWPF and SRTC. Areas that require further work to sufficiently define the process basis or technical operating envelop for DWPF. This activity involves the application of sound engineering and development principles to define the scope of work required to complete the technical data. The identification of the level of effort and expertise required to provide process technical consultation during the start-up and demonstration of this first of a kind plant.

  3. DWPF Development Plan. Revision 1

    International Nuclear Information System (INIS)

    Holtzscheiter, E.W.

    1994-01-01

    The DWPF Development Plan is based on an evaluation process flowsheet and related waste management systems. The scope is shown in Figure 1 entitled ''DWPF Process Development Systems.'' To identify the critical development efforts, each system has been analyzed to determine: The identification of unresolved technology issues. A technology issue (TI) is one that requires basic development to resolve a previously unknown process or equipment problem and is managed via the Technology Assurance Program co-chaired by DWPF and SRTC. Areas that require further work to sufficiently define the process basis or technical operating envelop for DWPF. This activity involves the application of sound engineering and development principles to define the scope of work required to complete the technical data. The identification of the level of effort and expertise required to provide process technical consultation during the start-up and demonstration of this first of a kind plant

  4. Sustainable Development and Spatial Planning: Some considerations arising from the Greek case

    Directory of Open Access Journals (Sweden)

    Pavlos Marinos Delladetsima

    2012-03-01

    Full Text Available The paper aims to elaborate on the notion of sustainable development in relation to spatial planning and to question its applicability based on the experience arising from the distinct socio-economic situation in Greece. Experience accumulated in the country with the adoption of sustainable development as a spatial policy concept proves to be in contradiction with perceptions that consider it as a basis for improving the plan making process and the planning system as whole. In this respect, it is argued that sustainable development is not a feasible proposition for planning in Greece and offers little to alleviate urban development and sprawl problems. Further, the paper highlights how a globalised approach to sustainable development and planning in Greece has made a negligible contribution to reinvigorating a weak and disjointed system, while also creating significant adverse effects in spatial policymaking.

  5. SP-100 coated-particle fuel development. Phase I. Final report

    International Nuclear Information System (INIS)

    1983-03-01

    This document is the final report of Phase I of the SP-100 Coated-Particle Fuel Development Program conducted by GA Technologies Inc. for the US Department of Energy under contract DE-AT03-82SF11690. The general objective of the study conducted between September and December 1982 was to evaluate coated-particle type fuel as an alternate or backup fuel to the UO 2 tile-and-fin arrangement currently incorporated into the reference design of the SP-100 reactor core. This report presents and discusses the following topics in the order listed: the need for an alternative fuel for the SP-100 nuclear reactor; an abbreviated description of the reference and coated-particle fuel module concepts; the bases and results of the study and analysis leading to the preliminary design of a coated particle suitable for the SP-100 space power reactor; incorporation of the fuel particles into compacts and heat-pipe-cooled modules; initial efforts and plans to fabricate coated-particle fuel and fuel compacts; the design and performance of the proposed alternative core relative that of the reference fuel; and a summary of critical issues and conclusions consistent with the level of effort and duration of the study

  6. A study on the research and development planning of nuclear energy

    International Nuclear Information System (INIS)

    Noh, Byong Chull; Won, B. C.; Kim, J. W.; Cho, C. Y.; Cheon, S. H.; Kim, J. U.; Kim, I. C.; Hong, Y. P.; Kang, W. J.; Lee, H. S.; Yoon, Y. S.; Park, J. H.; Kim, S. S.; Park, C. S.; Yang, M. S.; Lee, Y. H.

    1998-01-01

    This study was performed aiming to provide the basic input to establish 'the mild and long-term nuclear R and D program (1997 - 2006)' for government. This program is announced by the government as an official plan after endorsement of Atomic Energy Commission (AEC). Second, the historical formation and transition of both nuclear R and D policy and nuclear R and D development system after the introduction of nuclear energy in Korea were analyzed. Third, the current status of several nuclear-related R and D projects and R and D management, which have been conducted at KAERI were analyzed and a better direction for effective and efficient R and D activities was suggested. Finally, on the basis of above analysis, this study made an effort to extract the appropriate lessons for future directions for carrying out nuclear R and D projects. (author). 19 refs., 40 tabs., 10 figs

  7. A study on the research and development planning of nuclear energy

    Energy Technology Data Exchange (ETDEWEB)

    Noh, Byong Chull; Won, B. C.; Kim, J. W.; Cho, C. Y.; Cheon, S. H.; Kim, J. U.; Kim, I. C.; Hong, Y. P.; Kang, W. J.; Lee, H. S.; Yoon, Y. S.; Park, J. H.; Kim, S. S.; Park, C. S.; Yang, M. S.; Lee, Y. H

    1998-01-01

    This study was performed aiming to provide the basic input to establish `the mild and long-term nuclear R and D program (1997 - 2006)` for government. This program is announced by the government as an official plan after endorsement of Atomic Energy Commission (AEC). Second, the historical formation and transition of both nuclear R and D policy and nuclear R and D development system after the introduction of nuclear energy in Korea were analyzed. Third, the current status of several nuclear-related R and D projects and R and D management, which have been conducted at KAERI were analyzed and a better direction for effective and efficient R and D activities was suggested. Finally, on the basis of above analysis, this study made an effort to extract the appropriate lessons for future directions for carrying out nuclear R and D projects. (author). 19 refs., 40 tabs., 10 figs

  8. Partial county development plans as a means for preserving wild reindeer habitats in Norway

    Directory of Open Access Journals (Sweden)

    Hans Olav Bråtå

    2008-06-01

    Full Text Available Norwegian wild reindeer habitats are threatened by human intervention. Wild reindeer habitats are joint region wide common pool resources (CPR. Municipalities may be free-riders to that resource if they prefer investments boosting municipal economy despite negative consequences for wild reindeer as a regional resource. Partial county development plans, following the rules of the Planning and Building Act (PBA, are a means that may combine preservation of habitats and development. In order to analyze such plans, theory on CPR management is applied to spatial development planning in the Rondane and Hardangervidda wild reindeer areas. It is shown that the nested system is in accordance with most of Ostrom’s principles. Still, a joint Planning Board ought to be established at Hardangervidda and a partial county plan for the whole wild reindeer area there ought to be established. It is recommended that regular monitoring of interventions and planning is established. Finally, a system or mechanism for low cost conflict resolution is needed; but is not easily included into a system based on official actors at different levels, the planning and building act and public anticipation on equal management. The last point is important for mutual acceptance of restrictions on own activity. Abstract in Norwegian / Sammendrag:Kunnskap om forvaltning av fellesressurer øker forståelsen av regionale planer for villreinområderNorske villreinområder er truet av menneskelige inngrep. Villreinområdene er en regional fellesressurs, men kommunene kan bli gratispassasjerer i forhold til utnytting av denne ressursen ettersom de kan bli fristet til å vektlegge utbygging som gir lokaløkonomiske effekter, på tross av negative konsekvenser for villreinen som en regional ressurs. Fylkesdelplaner, som er basert på plan- og bygningsloven, er et virkemiddel som kan kombinere bevaring og utvikling. For å forstå slike planers muligheter og begrensninger analyses her

  9. Idaho Chemical Processing Plant Spent Fuel and Waste Management Technology Development Program Plan

    International Nuclear Information System (INIS)

    1993-09-01

    The Department of Energy (DOE) has received spent nuclear fuel (SNF) at the Idaho Chemical Processing Plant (ICPP) for interim storage and reprocessing since 1953. Reprocessing of SNF has resulted in an existing inventory of 1.5 million gallons of radioactive sodium-bearing liquid waste and 3800 cubic meters (m 3 ) of calcine, in addition to the 768 metric tons (MT) of SNF and various other fuel materials in inventory. To date, the major activity of the ICPP has been the reprocessing of SNF to recover fissile uranium; however, recent changes in world events have diminished the demand to recover and recycle this material. As a result, DOE has discontinued reprocessing SNF for uranium recovery, making the need to properly manage and dispose of these and future materials a high priority. In accordance with the Nuclear Waste Policy Act (NWPA) of 1982, as amended, disposal of SNF and high-level waste (HLW) is planned for a geological repository. Preparation of SNF, HLW, and other radioactive wastes for disposal may include mechanical, physical, and/or chemical processes. This plan outlines the program strategy of the ICPP Spent Fuel and Waste Management Technology Development Program (SF ampersand WMTDP) to develop and demonstrate the technology required to ensure that SNF and radioactive waste will properly stored and prepared for final disposal. Program elements in support of acceptable interim storage and waste minimization include: developing and implementing improved radioactive waste treatment technologies; identifying and implementing enhanced decontamination and decommissioning techniques; developing radioactive scrap metal (RSM) recycle capabilities; and developing and implementing improved technologies for the interim storage of SNF

  10. Wildlife Protection, Mitigation and Enhancement Planning for Grand Coulee Dam, Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Creveling, Jennifer

    1986-08-01

    The development and operation of Grand Coulee Dam inundated approximately 70,000 acres of wildlife habitat under the jurisdictions of the Colville Confederated Tribes, the Spokane Tribe, and the State of Washington. Under the provisions of the Pacific Northwest Electric Power Planning and Conservation Act of 1980, this study reviews losses to wildlife and habitat, and proposes mitigation for those losses. Wildlife loss estimates were developed from information available in the literature. Habitat losses and potential habitat gains through mitigation were estimated by a modified Habitat Evaluation Procedure. The mitigation plan proposes (1) acquisition of sufficient land or management rights to land to protect Habitat Units equivalent to those lost (approximately 73,000 acres of land would be required), (2) improvement and management of those lands to obtain and perpetuate target Habitat Units, and (3) protection and enhancement of suitable habitat for bald eagles. Mitigation is presented as four actions to be implemented over a 10-year period. A monitoring program is proposed to monitor mitigation success in terms of Habitat Units and wildlife population trends.

  11. Developing and executing a strategic plan.

    Science.gov (United States)

    Morley, Glenn

    2010-02-01

    Because of the historic economic crisis, the past 18 months--2008 and the first half of 2009--have been challenging for many plastic surgery practices. Prior to the economic crisis in 2008, many practices enjoyed success with little synchronization between financial and productivity results, practice goals, and strategic planning. Now, suddenly, there is a great deal of interest in the alignment of budgets and financial reporting, marketing return on investment (ROI), staff accountability, and overhead management. The process of developing a business plan can serve to bring clarity and objectivity to the assessment of practice goals and market dynamics. The business planning process also provides assurance of more efficient use of the practice's human and capital resources. Ultimately, the process will bring order, discipline, and focus to practice stakeholders, thus increasing the likelihood of meeting or exceeding practice goals. The process: (1) defining the mission of the practice; (2) completing a competitive analysis for your market; (3) completing an assessment of your current environment; (4) completing an assessment of the financial health of your practice; (5) preparation of a SWOT (strengths, weakness, opportunity, threat) analysis; and (6) a translation of your mission statement into specific long-term goals and short-term performance objectives. The outcome of completing these tasks should be an actionable plan that will serve as a guide or road map for the practice. A well-articulated plan will solidify staff confidence, continue the advancement of a strong business foundation, and provide clear navigation through this new economic landscape in a way that preserves your ability to provide the care you have devoted yourselves to deliver. Today's needs, and yesterday's lessons, dictate that a well-documented strategic action plan be undertaken. Thieme Medical Publishers.

  12. Customer acquisition plan for a small-size entrepreneur

    OpenAIRE

    Puotiniemi, Tiia

    2014-01-01

    The aim of this thesis was to draw a customer acquisition plan and improve the marketing planning in the company. Therefore, the final result was the market research summary. Development of the marketing strategy planning was based on internal and external situation analyses. This thesis is concentrated on a small-size operator’s business and therefore the internet marketing was brought up with its profitable benefits and advantages. The thesis was written as an auxiliary guide to build u...

  13. Quinault Indian Nation Renewable Energy Plan

    Energy Technology Data Exchange (ETDEWEB)

    Don Hopps, Institute for Washington' s Future; Jesse Nelson, Institute for Washington' s Future

    2006-11-28

    . This plan calls for commercial-scale production only, with the QIN being the first “customer” for the product. This plan favors employing the pyrolysis technology to produce bio-oil, heat, and char. We favor this approach and technology because it is the most cost effective way to use the available resource. Its main product, bio-oil, has proven utility for the production of heat and electricity. It has promise for use as an alternative fuel, which is a much higher value than present uses of wood and it meets the QIN need for flexibility, scalability, and portability. Char, the secondary product from the pyrolysis process, has proven value-added uses. In addition to these direct benefits, the use of biomass in pyrolysis technology has significant indirect benefits. These benefits include the fact that the technology is a good fit with the Nation’s cultural values, i.e., environmental protection and the holistic use of a resource. It fits well with current QIN enterprises. For example, char could be processed into a charcoal co-product for QIN fish. Finally, the QIN can become a leader in developing and demonstrating this innovative approach to the use of wood. This plan proposes key organization steps to insure both excellent implementation of the plan and taking the best advantage of the processes and facilities put in place. This plan calls for two new QIN organizations: an energy production/distribution corporation and a community development corporation. The production/distribution corporation can be either a utility or a business enterprise that develops and markets renewable energy. The community development corporation can be a not-for-profit to support the QIN in taking best advantage of its energy opportunities. The production and distribution corporation is the subject of a further business planning effort now underway. This plan envisions a community development corporation that works directly with the Business Committee on research, education, and

  14. Sanitation planning in developing countries

    OpenAIRE

    Kerstens, S.M.

    2016-01-01

    Sanitation planning in developing countries: Added value of resource recovery Worldwide 2.5 billion people lack access to sanitation. This impacts human live, the environment and represents a loss of valuable resources that can be regained from wastewater. This study shows that resource recovery can be a potential driver to accelerate sanitation. A new sanitation decision framework for policy makers was created and tested in Indonesia. The variety of advantages and disadvantages of sanitatio...

  15. Proposed plan for critical experiments supporting thorium fuel cycle development

    International Nuclear Information System (INIS)

    Gore, B.F.

    1978-09-01

    A preliminary plan is proposed for critical experiments to provide data needed for the recycle of thorium based nuclear fuels. The sequence of experimentation starts with well moderated solutions followed by highly concentrated low moderated solutions. It then progresses through lattices moderated by water, by water plus soluble poisons, and by fissile solutions, to solutions poisoned by raschig rings and soluble poisons. Final experiments would treat lattices moderated by poisoned fissile solution, and arrays of stored fissile units

  16. Agency procedures for the NRC incident response plan. Final report

    International Nuclear Information System (INIS)

    1983-02-01

    The NRC Incident Response Plan, NUREG-0728/MC 0502 describes the functions of the NRC during an incident and the kinds of actions that comprise an NRC response. The NRC response plan will be activated in accordance with threshold criteria described in the plan for incidents occurring at nuclear reactors and fuel facilities involving materials licensees; during transportation of licensed material, and for threats against facilities or licensed material. In contrast to the general overview provided by the Plan, the purpose of these agency procedures is to delineate the manner in which each planned response function is performed; the criteria for making those response decisions which can be preplanned; and the information and other resources needed during a response. An inexperienced but qualified person should be able to perform functions assigned by the Plan and make necessary decisions, given the specified information, by becoming familiar with these procedures. This rule of thumb has been used to determine the amount of detail in which the agency procedures are described. These procedures form a foundation for the training of response personnel both in their normal working environment and during planned emergency exercises. These procedures also form a ready reference or reminder checklist for technical team members and managers during a response

  17. The influence of territory planning and social development on strategic decisions in passenger transport development

    Directory of Open Access Journals (Sweden)

    D. Griškevičienė

    2004-10-01

    Full Text Available The main factors of space planning and social development which play an important role in making strategic decisions in passenger transportation have been analysed. A number of strategic aims based on major principles of territory transport planning have been formulated. The investigation made has shown that the operation of public transport is not closely connected with the main carcass of urban territories. This decreases the efficiency of public transport, making it less popular and competitive compared to automobiles. The creation of the strategy of public transport development for the period of its integration into the EU system requires the use of methods taking into account territory planning and social and economic development of the country. The integration of new territories into the existing transportation system, optimization of routes and the increase of transport service quality are aimed to provide higher living standards and better social and economic conditions for the inhabitants. The appropriate tactical decisions in planning the development of modern passenger transport may be made only if the harmonized and well-grounded strategic aims are defined.

  18. Development of a computerized handbook of architectural plans

    NARCIS (Netherlands)

    Koutamanis, A.

    1990-01-01

    The dissertation investigates an approach to the development of visual / spatial computer representations for architectural purposes through the development of the computerized handbook of architectural plans (chap), a knowledge-based computer system capable of recognizing the metric properties of

  19. The Role of Regional Strategies in Sustainable Development: The Approach of City Plan

    Directory of Open Access Journals (Sweden)

    Mustafa Polat

    2014-11-01

    Full Text Available In the world economy and development, understanding changes are occurring, with the EU integration process of developments and understanding of planning priorities when considered as together, "city" scale development approach and an appropriate planning system, that is the basis of Turkey`s administrative division and the national management system, should be improved self-rises. To reduce disparities among regions to an acceptable level and development of relatively underdeveloped regions and cities, naturally, a development and planning system even starting from the city and province levels, is required. In today's sustainable understanding and evolution tools, burden important functions to local units, as "participation" in the foreground stands out in the stages of planning and execution of the development strategies. Regional and city development plans and strategies as the center of rapid and balanced development dynamics are sensitive to local needs and local initiatives are required in being a trigger level. The study is done with Goal Directed Project Management methodology, and in the study city level taken as an example of city scale development approach and an appropriate planning system.

  20. The Role of Regional Strategies in Sustainable Development: The Approach of City Plan

    Directory of Open Access Journals (Sweden)

    Mustafa Polat

    2016-01-01

    Full Text Available In the world economy and development, understanding changes are occurring, with the EU integration process of developments and understanding of planning priorities when considered as together, "city" scale development approach and an appropriate planning system, that is the basis of Turkey`s administrative division and the national management system, should be improved self-rises. To reduce disparities among regions to an acceptable level and development of relatively underdeveloped regions and cities, naturally, a development and planning system even starting from the city and province levels, is required. In today's sustainable understanding and evolution tools, burden important functions to local units, as "participation" in the foreground stands out in the stages of planning and execution of the development strategies. Regional and city development plans and strategies as the center of rapid and balanced development dynamics are sensitive to local needs and local initiatives are required in being a trigger level. The study is done with Goal Directed Project Management methodology, and in the study city level taken as an example of city scale development approach and an appropriate planning system.

  1. Geospatial Based Information System Development in Public Administration for Sustainable Development and Planning in Urban Environment

    OpenAIRE

    Georgios N. Kouziokas

    2016-01-01

    It is generally agreed that the governmental authorities should actively encourage the development of an efficient framework of information and communication technology initiatives so as to advance and promote sustainable development and planning strategies. This paper presents a prototype Information System for public administration which was designed to facilitate public management and decision making for sustainable development and planning. The system was developed by using several progra...

  2. Groundwater protection management program plan

    International Nuclear Information System (INIS)

    1992-06-01

    US Department of Energy (DOE) Order 5400.1 requires the establishment of a groundwater protection management program to ensure compliance with DOE requirements and applicable Federal, state, and local laws and regulations. The Uranium Mill Tailings Remedial Action (UMTRA) Project Office has prepared a ''Groundwater Protection Management Program Plan'' (groundwater protection plan) of sufficient scope and detail to reflect the program's significance and address the seven activities required in DOE Order 5400.1, Chapter 3, for special program planning. The groundwater protection plan highlights the methods designed to preserve, protect, and monitor groundwater resources at UMTRA Project processing and disposal sites. The plan includes an overview of the remedial action status at the 24 designated processing sites and identifies project technical guidance documents and site-specific documents for the UMTRA groundwater protection management program. In addition, the groundwater protection plan addresses the general information required to develop a water resources protection strategy at the permanent disposal sites. Finally, the plan describes ongoing activities that are in various stages of development at UMTRA sites (long-term care at disposal sites and groundwater restoration at processing sites). This plan will be reviewed annually and updated every 3 years in accordance with DOE Order 5400.1

  3. Evaluating and Quantifying User and Carer Involvement in Mental Health Care Planning (EQUIP: Co-Development of a New Patient-Reported Outcome Measure.

    Directory of Open Access Journals (Sweden)

    Penny Bee

    Full Text Available International and national health policy seeks to increase service user and carer involvement in mental health care planning, but suitable user-centred tools to assess the success of these initiatives are not yet available. The current study describes the development of a new reliable and valid, interval-scaled service-user and carer reported outcome measure for quantifying user/carer involvement in mental health care planning. Psychometric development reduced a 70-item item bank to a short form questionnaire using a combination of Classical Test, Mokken and Rasch Analyses. Test-retest reliability was calculated using t-tests of interval level scores between baseline and 2-4 week follow-up. Items were worded to be relevant to both service users and carers. Nine items were removed following cognitive debriefing with a service user and carer advisory group. An iterative process of item removal reduced the remaining 61 items to a final 14-item scale. The final scale has acceptable scalability (Ho = .69, reliability (alpha = .92, fit to the Rasch model (χ2(70 = 97.25, p = .02, and no differential item functioning or locally dependent items. Scores remained stable over the 4 week follow-up period, indicating good test-retest reliability. The 'Evaluating the Quality of User and Carer Involvement in Care Planning (EQUIP' scale displays excellent psychometric properties and is capable of unidimensional linear measurement. The scale is short, user and carer-centred and will be of direct benefit to clinicians, services, auditors and researchers wishing to quantify levels of user and carer involvement in care planning.

  4. THE COMMUNITY PLANNING PROCESS. KANSAS STATE UNIVERSITY SHORT COURSE SERIES ON COMMUNITY PLANNING AND DEVELOPMENT, 6.

    Science.gov (United States)

    WEISENBURGER, RAY B.

    PART OF A KANSAS STATE UNIVERSITY SERIES ON COMMUNITY PLANNING AND DEVELOPMENT, THIS MONOGRAPH DISCUSSES THE STAGES IN THE PREPARATION AND IMPLEMENTATION OF COMPREHENSIVE URBAN SCHEMES. FIRST OF ALL, SOCIAL ACCEPTANCE, ECONOMIC, FEASIBILITY, POLITICAL RESPONSIBILITY, AND ENVIRONMENTAL SATISFACTION ARE VITAL TO SUCCESSFUL PLANNING. ORGANIZATION FOR…

  5. A new plan-scoring method using normal tissue complication probability for personalized treatment plan decisions in prostate cancer

    Science.gov (United States)

    Kim, Kwang Hyeon; Lee, Suk; Shim, Jang Bo; Yang, Dae Sik; Yoon, Won Sup; Park, Young Je; Kim, Chul Yong; Cao, Yuan Jie; Chang, Kyung Hwan

    2018-01-01

    The aim of this study was to derive a new plan-scoring index using normal tissue complication probabilities to verify different plans in the selection of personalized treatment. Plans for 12 patients treated with tomotherapy were used to compare scoring for ranking. Dosimetric and biological indexes were analyzed for the plans for a clearly distinguishable group ( n = 7) and a similar group ( n = 12), using treatment plan verification software that we developed. The quality factor ( QF) of our support software for treatment decisions was consistent with the final treatment plan for the clearly distinguishable group (average QF = 1.202, 100% match rate, n = 7) and the similar group (average QF = 1.058, 33% match rate, n = 12). Therefore, we propose a normal tissue complication probability (NTCP) based on the plan scoring index for verification of different plans for personalized treatment-plan selection. Scoring using the new QF showed a 100% match rate (average NTCP QF = 1.0420). The NTCP-based new QF scoring method was adequate for obtaining biological verification quality and organ risk saving using the treatment-planning decision-support software we developed for prostate cancer.

  6. Land Management and Means of Planning Control

    DEFF Research Database (Denmark)

    Enemark, Stig

    2006-01-01

    The paper presents an overall understanding of the Land Management Paradigm for Sustainable Development. It is argued that such an understanding is important for facilitating a holistic approach to the management of land, properties, and natural resources being the key assets of any nation...... the historical and cultural developments of the European countries. Finally, the paper presents a short overview of the Danish approach to planning and landuse management as an example of a planning led approach placing the decision-making power especially at the local level. This concept of decentralization...

  7. Competency remodelling and application plans for development of job competency in RI-biomics

    Energy Technology Data Exchange (ETDEWEB)

    Shin, Woo Ho; Park, Tai Jin [Korean Association for Radiation Application, Seoul (Korea, Republic of)

    2017-03-15

    RI-Biomics technology is advanced convergence technologies that can be measured in real time and track in vivo behavior and metabolism of substances using characteristics of the radioactive isotope. Its application fields are increasing such as drug development, agriculture, development of new materials and their utilization, etc. In addition, according to domestic and international developments and changes in the RI-Biomics environment, RI-Biomics professionals are needed to train continuously. To develop systematic human resources basement and competency-based curriculum, we perform competency modeling of pedagogical perspective to targeted at high-performance on RI-Biomics. Furthermore, we redefine the competency model and verified by industry experts with focus group interviews. In the result, two general competencies and three professional competencies were extracted by interview. Each competencies are organized six sub-competencies and nine sub-competencies. In the final steps, the same procedures were repeated to obtain the consensus of experts on derived competencies and behavioral objectives. The results of the study are applicable to enhance human resource management and to develop the curriculum for RI-Biomics expert training. It is expected to be used as reference material of long term-planning for RI-Biomics professional.

  8. Competency remodelling and application plans for development of job competency in RI-biomics

    International Nuclear Information System (INIS)

    Shin, Woo Ho; Park, Tai Jin

    2017-01-01

    RI-Biomics technology is advanced convergence technologies that can be measured in real time and track in vivo behavior and metabolism of substances using characteristics of the radioactive isotope. Its application fields are increasing such as drug development, agriculture, development of new materials and their utilization, etc. In addition, according to domestic and international developments and changes in the RI-Biomics environment, RI-Biomics professionals are needed to train continuously. To develop systematic human resources basement and competency-based curriculum, we perform competency modeling of pedagogical perspective to targeted at high-performance on RI-Biomics. Furthermore, we redefine the competency model and verified by industry experts with focus group interviews. In the result, two general competencies and three professional competencies were extracted by interview. Each competencies are organized six sub-competencies and nine sub-competencies. In the final steps, the same procedures were repeated to obtain the consensus of experts on derived competencies and behavioral objectives. The results of the study are applicable to enhance human resource management and to develop the curriculum for RI-Biomics expert training. It is expected to be used as reference material of long term-planning for RI-Biomics professional

  9. British discretion in Dutch planning: establishing a comparative perspective for regional planning and local development in the Netherlands and the United Kingdom

    NARCIS (Netherlands)

    Janssen-Jansen, L.B.; Woltjer, J.

    2010-01-01

    Regional planning and development is continuing to take an important role in planning agendas throughout Europe. In the United Kingdom (UK), the planning system has been reformed during the last decades, marking a noticeable shift from a development-led towards a more plan-led system. In the

  10. Contribution to Quebec's economic development: Development plan 1993

    International Nuclear Information System (INIS)

    1992-01-01

    The activities of Hydro-Quebec are analyzed from the standpoint of their contribution to economic development and their support of regional development. The structuring effects of Hydro-Quebec's electricity supply activities are described, specifically the utility's role as an employer and an important agent of economic development by virtue of its purchasing power. The role played by research and development activities in the technological development of Quebec is discussed along with the contribution of those activities to new industrial developments. Finally, the impacts of electricity use on industrial development are considered. An analysis is presented of Hydro-Quebec's marketing activities and the options they afford. These marketing activities are aimed mainly at supporting economic development. The availability of reasonably priced electricity enhances the competitiveness of all industrial sectors, especially those for which electricity is a factor in siting. Furthermore, Hydro-Quebec can use its marketing activities to reinforce this comparative advantage. Hydro-Quebec can also support regional development by decentralizing operations, standardizing rates, and extending its marketing activities to the regions. 2 tabs

  11. Integrated National Energy Planning (INEP) in developing countries

    International Nuclear Information System (INIS)

    Munasinghe, M.

    1989-01-01

    Issues of coordinated energy planning are emphasized, with particular reference to interrelationships among the policies adopted in various energy sub-sectors such as electric power (including hydro, nuclear, geothermal, oil and coal sources), petroleum, natural gas, coal, non-conventional (solar, bio-gas, mini-hydro) and traditional fuels (woodfuel, bagasse or vegetable residue). The scope and objectives of integrated national energy planning, the policy tools available, and constraints particular to the developing countries are discussed next. Section 3.0 outlines how energy planning is carried out, while the problems of implementing the resulting policy conclusions are examined in section 4.0. 5 refs, 4 figs

  12. Dynamic plan modelling and visualization : converting an urban development plan into a transition scenario

    NARCIS (Netherlands)

    Vries, de B.; Jessurun, A.J.; Sadowski - Rasters, G.; Tidafy, T; Dorta, T

    2009-01-01

    Application of 3D models in urban planning practice is still limited to visualization of existing or newly designed situations. Municipalities are looking for possibilities to communicate the transition process of the urban development area with the citizens. A prototype system was developed to

  13. Study on Strategic Planning of Road and Bridge Infrastructure Development in City Planning: Taking Porto-novo City of Benin Republic as Example

    Directory of Open Access Journals (Sweden)

    Boko-haya Dossa Didier

    2018-01-01

    Full Text Available Concern about the townlet infrastructure construction in developing country is one of the crucial part of county town planning and development. By taking the overall planning and design in a case study of Porto-novo city at Republic of Benin, this paper analyzes the characteristics and opportunities of Porto-novo city and puts forward corresponding infrastructure construction strategy. In the end, the paper comes up with specific plan of planning and design under the background of Porto-novo's planning of development strategy.

  14. 77 FR 1078 - San Pablo Bay National Wildlife Refuge, Sonoma, Napa, and Solano Counties, CA; Final...

    Science.gov (United States)

    2012-01-09

    ... locations; develop shoreline fishing locations; and provide some additional environmental education programs... Comprehensive Conservation Plan and Finding of No Significant Impact AGENCY: Fish and Wildlife Service, Interior... availability of our final Comprehensive Conservation Plan (CCP) and finding of no significant impact (FONSI...

  15. Enhancing public participation in natural resource management using Soft OR - an application of strategic option development and analysis in tactical forest planning

    DEFF Research Database (Denmark)

    Hjortsø, Carsten Nico Portefée

    2004-01-01

    This article presents a case study where a modified version of strategic option development and analysis (SODA) is applied to enhance the level of citizens’ participation in a strategic forest management planning process managed by the Danish Forest and Nature Agency. The case is interesting...... because of structural differences between traditional Soft OR and public participation settings. Research shows that SODA can nevertheless improve public involvement in several ways, including stakeholders’ perception of being involved, stakeholders’ commitment, structuring of the planning context......, communication of stakeholder perspectives, identification and management of conflicts, decision process transparency, and agency accountability for final planning outcomes. The primary problems encountered relate to the difficulty of reading the cognitive maps, time requirements, and selection of facilitator...

  16. Career competences and importance of their development in planning of career perspective

    OpenAIRE

    Adomaitienė, Jūratė; Zubrickienė, Ilona

    2010-01-01

    Attempts are made in this article to reveal the essence of the process, related to the planning of career perspective, to highlight the aspect of dynamism in modern career competence, demonstrating importance and significance of its continuous development for planning of career perspective. Analysis is developed, introducing attitude of teachers and lecturers towards competence of their own career, its development and significance, planning perspective of one’s own career; towards reflection ...

  17. Developing a national dissemination plan for collaborative care for depression: QUERI Series

    Directory of Open Access Journals (Sweden)

    Rubenstein Lisa V

    2008-12-01

    Full Text Available Abstract Background Little is known about effective strategies for disseminating and implementing complex clinical innovations across large healthcare systems. This paper describes processes undertaken and tools developed by the U.S. Department of Veterans Affairs (VA Mental Health Quality Enhancement Research Initiative (MH-QUERI to guide its efforts to partner with clinical leaders to prepare for national dissemination and implementation of collaborative care for depression. Methods An evidence-based quality improvement (EBQI process was used to develop an initial set of goals to prepare the VA for national dissemination and implementation of collaborative care. The resulting product of the EBQI process is referred to herein as a "National Dissemination Plan" (NDP. EBQI participants included: a researchers with expertise on the collaborative care model for depression, clinical quality improvement, and implementation science, and b VA clinical and administrative leaders with experience and expertise on how to adapt research evidence to organizational needs, resources and capacity. Based on EBQI participant feedback, drafts of the NDP were revised and refined over multiple iterations before a final version was approved by MH-QUERI leadership. 'Action Teams' were created to address each goal. A formative evaluation framework and related tools were developed to document processes, monitor progress, and identify and act upon barriers and facilitators in addressing NDP goals. Results The National Dissemination Plan suggests that effectively disseminating collaborative care for depression in the VA will likely require attention to: Guidelines and Quality Indicators (4 goals, Training in Clinical Processes and Evidence-based Quality Improvement (6 goals, Marketing (7 goals, and Informatics Support (1 goal. Action Teams are using the NDP as a blueprint for developing infrastructure to support system-wide adoption and sustained implementation of

  18. Argonne National Laboratory institutional plan FY 2001--FY 2006.

    Energy Technology Data Exchange (ETDEWEB)

    Beggs, S.D.

    2000-12-07

    This Institutional Plan describes what Argonne management regards as the optimal future development of Laboratory activities. The document outlines the development of both research programs and support operations in the context of the nation's R and D priorities, the missions of the Department of Energy (DOE) and Argonne, and expected resource constraints. The Draft Institutional Plan is the product of many discussions between DOE and Argonne program managers, and it also reflects programmatic priorities developed during Argonne's summer strategic planning process. That process serves additionally to identify new areas of strategic value to DOE and Argonne, to which Laboratory Directed Research and Development funds may be applied. The Draft Plan is provided to the Department before Argonne's On-Site Review. Issuance of the final Institutional Plan in the fall, after further comment and discussion, marks the culmination of the Laboratory's annual planning cycle. Chapter II of this Institutional Plan describes Argonne's missions and roles within the DOE laboratory system, its underlying core competencies in science and technology, and six broad planning objectives whose achievement is considered critical to the future of the Laboratory. Chapter III presents the Laboratory's ''Science and Technology Strategic Plan,'' which summarizes key features of the external environment, presents Argonne's vision, and describes how Argonne's strategic goals and objectives support DOE's four business lines. The balance of Chapter III comprises strategic plans for 23 areas of science and technology at Argonne, grouped according to the four DOE business lines. The Laboratory's 14 major initiatives, presented in Chapter IV, propose important advances in key areas of fundamental science and technology development. The ''Operations and Infrastructure Strategic Plan'' in Chapter V includes

  19. Develop a Professional Learning Plan

    Science.gov (United States)

    Journal of Staff Development, 2013

    2013-01-01

    A professional learning plan establishes short-and long-term plans for professional learning and implementation of the learning. Such plans guide individuals, schools, districts, and states in coordinating learning experiences designed to achieve outcomes for educators and students. Professional learning plans focus on the program of educator…

  20. Plan Colombia or development as security

    Directory of Open Access Journals (Sweden)

    Juan Pablo Guevara Latorre

    2015-01-01

    the most relevant policy for the construction of the State in 21st-century Colombia from a critical standpoint. The document makes it possible to show that Plan Colombia is a privatized form of development, interpreted in terms of security based on an incomplete understanding of the Colombian conflict that prevails into our present

  1. Responding to the World Health Organization Global Disability Action Plan in Egypt: A Technical Consultancy to develop a National Disability, Health and Rehabilitation Plan

    Directory of Open Access Journals (Sweden)

    Christoph Gutenbrunner

    2018-01-01

    Full Text Available Objective: A technical consultation to develop a National Disability, Health and Rehabilitation Plan (NDHRP for Egypt was carried out in 2015. Its overall goal was to improve health, functioning, well-being, quality of life, and participation of persons with disability in Egypt by supporting the Ministry of Health and Population and other stakeholders to improve access to health services and strengthen health-related rehabilitation services for all persons in need. Methods: The methodological steps of the technical consultation were as follows: collecting and reviewing accessible documents and data; site visits to state institutions, health and rehabilitation services; discussions with relevant stakeholders in rehabilitation, including persons with disability; drafting recommendations based on the principles of the World Report on Disability and the World Health Organization Global Disability Action Plan and the information collected; discussion with stakeholders in a workshop; and preparation of a final report. Results and discussion: The development of a NDHRP was successful and led to recommendations with a good level of consensus among stakeholders in Egypt. The authors hope that the NDHRP will lead to improved rehabilitation service provision, and health and quality of life of persons with disability and chronic health conditions living in Egypt.

  2. Hanford Waste Vitrification Plant Technology Plan

    International Nuclear Information System (INIS)

    Sexton, R.A.

    1988-06-01

    The reference Hanford plan for disposal of defense high-level waste is based on waste immobilization in glass by the vitrification process and temporary vitrified waste storage at the Hanford Site until final disposal in a geologic repository. A companion document to the Hanford Waste Management Plan (HWMP) is the Draft, Interim Hanford Waste Management Technology Plan (HWMTP), which provides a description of the technology that must be developed to meet the reference waste management plan. One of the issues in the HWMTP is DST-6, Immobilization (Glass). The HWMTP includes all expense funding needed to complete the Hanford Waste Vitrification Plant (HWVP) project. A preliminary HWVP Technology Plan was prepared in 1985 as a supporting document to the HWMTP to provide a more detailed description of the technology needed to construct and operate a vitrification facility. The plan was updated and issued in 1986, and revised in 1987. This document is an annual update of the plan. The HWVP Technology Plan is limited in scope to technology that requires development or confirmation testing. Other expense-funded activities are not included. The relationship between the HWVP Technology Plan and other waste management issues addressed in the HWMTP is described in section 1.6 of this plan. 6 refs., 4 figs., 34 tabs

  3. DEVELOPING FINAL COURSE MONOGRAPHS USING A TEAM-BASED LEARNING METHODOLOGY

    Directory of Open Access Journals (Sweden)

    Ani Mari Hartz

    2016-04-01

    Full Text Available This article describes an experience with the Team-Based Learning (TBL methodology in courses designed to support the planning and execution of final course monographs. It contains both professors’ and students’ perceptions, through observation and assessment. A qualitative approach using observation techniques and desk research was used in conjunction with a quantitative approach based on a questionnaire. The sample consisted of 49 students from a higher education institution, 27 of them in a Communication Course and the remaining 22 in a Business Administration course. Qualitative data analysis was performed through simple categorization with back-defined categories, while the quantitative data analysis employed descriptive statistics and cluster analysis using Minitab 17.1 software. The main findings include the identification of: three student profiles (designated as traditional, collaborative and practical; a preference for guidance and feedback from the professor rather than other students; and a need for a professor-led closing discussion when applying the TBL method. As regards the main benefits to students, they recognized that discussion in groups allowed them to realize how much they really know about the subject studied. Finally, most students seemed to like the TBL approach.

  4. Ten-Year Network Development Plan - 2015 edition, executive summary

    International Nuclear Information System (INIS)

    2016-01-01

    Complying with the European and French laws, each year, RTE prepares and publicizes a Ten-Year Network Development Plan (NDP) to meet the expectations of its stakeholders and customers. The NDP lists the network development projects that RTE plans to complete and commission over a 3-year period and presents the main power transmission infrastructure work envisaged for the next Ten-years. Beyond, it outlines the possible network adaptation needs for a variety of energy transition scenarios. Over the next 10 years, the network investments will make it possible to: - Meet the goals of the Regional Climate Air Energy Plans, - Create 4 GW of extra offshore wind generation integration capacity and 10 GW of additional interconnection capacity, 2/3 more than the current capacity, - Enable the development of economically and demographically dynamic areas, with safe and high-standard electricity supply. In the coming decade, RTE plans: - 1,200 km of new underground and sub-sea DC links, along with their associated converter stations; - 600 km of existing equipment upgrades or new overhead 400 kV AC circuits substituting existing power lines. - and, at the same time, nearly 900 km of underground lines and just over 400 km of overhead 225 kV AC lines should be built. 400 projects are listed in this NDP: - 21% of the operations are on overhead lines (for 3/4 new lines or upgrade and for 1/4 dismantling of existing assets) - 27% concern new underground lines; - 52% on substation adaptations (about 20 new RTE substations and 100 new customer substations connected). Globally, nearly 80% of the network is developed underground or sub-sea. This edition of the Network Development plan is further enriched. In particular, it explains more thoroughly the link between the integration of renewable energy and the entailed development of the transmission network. It also provides a focus on smart grids. This edition relies on mid and long term scenarios describing the evolution of the

  5. SU-E-J-244: Development and Validation of a Knowledge Based Planning Model for External Beam Radiation Therapy of Locally Advanced Non-Small Cell Lung Cancer

    Energy Technology Data Exchange (ETDEWEB)

    Liu, Z; Kennedy, A [Sarah Cannon, Nashville, TN (United States); Larsen, E; Hayes, C; Grow, A [North Florida Cancer Center, Gainesville, FL (United States); Bahamondes, S.; Zheng, Y; Wu, X [JFK Comprehensive Cancer Institute, Lake Worth, FL (United States); Choi, M; Pai, S [Good Samaritan Hospital, Los Gatos, CA (United States); Li, J [Doctors Hospital of Augusta, Augusta, GA (United States); Cranford, K [Trident Medical Center, Charleston, SC (United States)

    2015-06-15

    Purpose: The study aims to develop and validate a knowledge based planning (KBP) model for external beam radiation therapy of locally advanced non-small cell lung cancer (LA-NSCLC). Methods: RapidPlan™ technology was used to develop a lung KBP model. Plans from 65 patients with LA-NSCLC were used to train the model. 25 patients were treated with VMAT, and the other patients were treated with IMRT. Organs-at-risk (OARs) included right lung, left lung, heart, esophagus, and spinal cord. DVH and geometric distribution DVH were extracted from the treated plans. The model was trained using principal component analysis and step-wise multiple regression. Box plot and regression plot tools were used to identify geometric outliers and dosimetry outliers and help fine-tune the model. The validation was performed by (a) comparing predicted DVH boundaries to actual DVHs of 63 patients and (b) using an independent set of treatment planning data. Results: 63 out of 65 plans were included in the final KBP model with PTV volume ranging from 102.5cc to 1450.2cc. Total treatment dose prescription varied from 50Gy to 70Gy based on institutional guidelines. One patient was excluded due to geometric outlier where 2.18cc of spinal cord was included in PTV. The other patient was excluded due to dosimetric outlier where the dose sparing to spinal cord was heavily enforced in the clinical plan. Target volume, OAR volume, OAR overlap volume percentage to target, and OAR out-of-field volume were included in the trained model. Lungs and heart had two principal component scores of GEDVH, whereas spinal cord and esophagus had three in the final model. Predicted DVH band (mean ±1 standard deviation) represented 66.2±3.6% of all DVHs. Conclusion: A KBP model was developed and validated for radiotherapy of LA-NSCLC in a commercial treatment planning system. The clinical implementation may improve the consistency of IMRT/VMAT planning.

  6. Handling and final disposal of nuclear waste. Hard Rock Laboratory

    International Nuclear Information System (INIS)

    1989-09-01

    The purpose of the Hard Rock Laboratory is to provide an opportunity for research and development in a realistic and undisturbed underground rock environment down to the depth planned for the future repository. The R and D work in the underground laboratory has the following main goals: To test the quality and appropriateness of different methods for characterizing the bedrock with respect to conditions of importance for a final repository. To refine and demonstrate methods for how to adapt a repository to the local properties of the rock in connection with planning and construction. And, finally, to collect material and data of importance for the safety of the future repository and for confidence in the quality of the safety assessments 13 figs, 3 tabs

  7. Draft Transportation Institutional Plan

    International Nuclear Information System (INIS)

    1985-09-01

    The Department of Energy recognizes that the success of its program to develop and implement a national system for nuclear waste management and disposal depends on broad-based public understanding and acceptance. While each program element has its particular sensitivity, the transportation of the waste may potentially affect the greatest number of people, and accordingly is highly visible and potentially issue-laden. Therefore, the Office of Civilian Radioactive Waste Management has developed this Transportation Institutional Plan to lay the foundation for interaction among all interested parties for the purpose of identifying and resolving issues of concern. The Plan is divided into four chapters. Chapter 1 provides bachground information and discusses the purpose of the Plan and the policy guidance for establishing the transportation system. Chapter 2 introduces the major participants who must interact to build both the system itself and the consensus philosophy that is essential for effective operations. Chapter 3 suggests mechanisms for interaction that will ensure wide participation in program planning and implementation. And, finally, Chapter 4 suggests a framework for managing and resolving the issues related to development and operation of the transportation system. A list of acronyms and a glossary are included for the reader's convenience. The Plan's appendices provide supporting material to assist the reader in understanding the roles of the involved institutions. 4 figs., 1 tab

  8. Advanced High-Level Waste Glass Research and Development Plan

    Energy Technology Data Exchange (ETDEWEB)

    Peeler, David K. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Vienna, John D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Schweiger, Michael J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Fox, Kevin M. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2015-07-01

    The U.S. Department of Energy Office of River Protection (ORP) has implemented an integrated program to increase the loading of Hanford tank wastes in glass while meeting melter lifetime expectancies and process, regulatory, and product quality requirements. The integrated ORP program is focused on providing a technical, science-based foundation from which key decisions can be made regarding the successful operation of the Hanford Tank Waste Treatment and Immobilization Plant (WTP) facilities. The fundamental data stemming from this program will support development of advanced glass formulations, key process control models, and tactical processing strategies to ensure safe and successful operations for both the low-activity waste (LAW) and high-level waste (HLW) vitrification facilities with an appreciation toward reducing overall mission life. The purpose of this advanced HLW glass research and development plan is to identify the near-, mid-, and longer-term research and development activities required to develop and validate advanced HLW glasses and their associated models to support facility operations at WTP, including both direct feed and full pretreatment flowsheets. This plan also integrates technical support of facility operations and waste qualification activities to show the interdependence of these activities with the advanced waste glass (AWG) program to support the full WTP mission. Figure ES-1 shows these key ORP programmatic activities and their interfaces with both WTP facility operations and qualification needs. The plan is a living document that will be updated to reflect key advancements and mission strategy changes. The research outlined here is motivated by the potential for substantial economic benefits (e.g., significant increases in waste throughput and reductions in glass volumes) that will be realized when advancements in glass formulation continue and models supporting facility operations are implemented. Developing and applying advanced

  9. AN EVALUATION TO IDENTIFY THE BARRIERS TO THE FEASIBILITY OF URBAN DEVELOPMENT PLANS: FIVE DECADES OF EXPERIENCE IN URBAN PLANNING IN IRAN

    Directory of Open Access Journals (Sweden)

    Mohammad Javad Maghsoodi Tilaki

    2014-01-01

    Full Text Available The rapid urbanization in many developing countries has indicat ed several challenges in different aspects. This is due t o inefficient urban planning ap proaches towards managing the development process. Similar to many other developing count ries, Iran has experienced rapid urbanization in recent decades. Although over the last few decades, urban planning processes have been applied to develop Iranian c ities, urban planning has failed to tackle the challenges facing the cities. This paper s eeks to identify the barriers that have prevented Iranian c ities from achieving the goals of urban planning. The purpose of this paper is to provide a comprehensive review of the curre nt literature on the concept of urban planning and to assess the urban development plan proc ess in Iranian cities. The required data were collected through a review of international theoretical studies, Iranian experimental research and governmental reports. The findings of this study reveal five major barriers to the feasibility of the urban planning process , including the urban plans context, structure of urban pla nning, related law and regulatio ns, public participation, and financial resources.

  10. Multi-agency radiation survey and site investigation manual (MARSIM). Final report

    International Nuclear Information System (INIS)

    1997-12-01

    The MARSSIM provides information on planning, conducting, evaluating, and documenting building surface and surface soil final status radiological surveys for demonstrating compliance with dose or risk-based regulations or standards. The MARSSIM is a multi-agency consensus document that was developed collaboratively by four Federal agencies having authority and control over radioactive materials: Department of Defense (DOD), Department of Energy (DOE), Environmental Protection Agency (EPA), and Nuclear Regulatory Commission (NRC). The MARSSIM's objective is to describe a consistent approach for planning, performing, and assessing building surface and surface soil final status surveys to meet established dose or risk-based release criteria, while at the same time encouraging an effective use of resources

  11. Multi-agency radiation survey and site investigation manual (MARSIM). Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-01

    The MARSSIM provides information on planning, conducting, evaluating, and documenting building surface and surface soil final status radiological surveys for demonstrating compliance with dose or risk-based regulations or standards. The MARSSIM is a multi-agency consensus document that was developed collaboratively by four Federal agencies having authority and control over radioactive materials: Department of Defense (DOD), Department of Energy (DOE), Environmental Protection Agency (EPA), and Nuclear Regulatory Commission (NRC). The MARSSIM`s objective is to describe a consistent approach for planning, performing, and assessing building surface and surface soil final status surveys to meet established dose or risk-based release criteria, while at the same time encouraging an effective use of resources.

  12. Medical RI development plan of KOMAC

    Science.gov (United States)

    Kim, Kye-Ryung; Jung, Myung-Hwan; Yoon, Sang-Pil; Min, Yi-Sub; Cho, Yong-Sub

    2017-12-01

    Many kinds of radioisotopes (RIs) produced by the high energy (100 200 MeV) proton accelerators are developed by the foreign R&D institutes and the worldwide demands are being increased continuously. The RI production using high energy proton beam higher than 50 MeV was not considerable because of the limit of the proton beam energy from existing proton accelerator facilities in Korea before 2013. The available maximum proton energy was 50 MeV from MC-50 cyclotron of Korea Institute of Radiological and Medical Sciences (KIRAMS) at that time. After the construction of a 100 MeV high-current and high-energy proton accelerator and a new irradiation facility for the RI production in 2013 and 2016 by the Korea Multi-purpose Accelerator Complex (KOMAC) at Korea Atomic Energy Research Institute (KAERI), we can make a plan for the new RI production of Cu-67, Sr-82 and so on. In the medical application fields, the worldwide demand of Sr-82 is being increased rapidly during last several years and the domestic demand of Cu-67 is also expected to be increased in near future. And alpha-emitters, such as Ac-225 and Ra-223, are becoming attractive to the users in the medical science fields in the future. The RI development plan of KOMAC was specified recently reflecting the recent environment changes and requirements from the users. In this paper, the results and present status of RI production and R&D facilities, calculation results related to the RI production yields, and future plans is presented.

  13. Software development to support decommissioning and waste management strategic planning

    International Nuclear Information System (INIS)

    Williams, John; Warneford, Ian; Harrison, J.

    1997-01-01

    One of the components of the UKAEA's mission is to care for and, at the appropriate time, safely dismantle its radioactive facilities which are no longer in use. To assist in the development of an optimised strategy, AEA Technology was commissioned to produce decision support software. This paper describes the background to the development of the software, its key features and current status, and the lessons learnt during the development. The software, known as UKAEA SPS (Strategic Planning System), is a unique support software package that has been developed to assist in the planning of decommissioning and radioactive waste management. SPS models linked decommissioning and waste management strategies covering all of UKAEA's nuclear liabilities. It has been developed around the database package ACCESS, and runs on Pentium PCs; however, it has many of the features of project planning systems. Its principal outputs are costs, timings and utilisation data for the waste stores, processing facilities, transport and disposal operations displayed at any level of aggregation. This allows programme managers to see easily the effects of changing key parameters in a strategy under development. (author)

  14. Developing a mental health care plan in a low resource setting: the theory of change approach.

    Science.gov (United States)

    Hailemariam, Maji; Fekadu, Abebaw; Selamu, Medhin; Alem, Atalay; Medhin, Girmay; Giorgis, Tedla Wolde; DeSilva, Mary; Breuer, Erica

    2015-09-28

    Scaling up mental healthcare through integration into primary care remains the main strategy to address the extensive unmet mental health need in low-income countries. For integrated care to achieve its goal, a clear understanding of the organisational processes that can promote and hinder the integration and delivery of mental health care is essential. Theory of Change (ToC), a method employed in the planning, implementation and evaluation of complex community initiatives, is an innovative approach that has the potential to assist in the development of a comprehensive mental health care plan (MHCP), which can inform the delivery of integrated care. We used the ToC approach to develop a MHCP in a rural district in Ethiopia. The work was part of a cross-country study, the Programme for Improving Mental Health Care (PRIME) which focuses on developing evidence on the integration of mental health in to primary care. An iterative ToC development process was undertaken involving multiple workshops with stakeholders from diverse backgrounds that included representatives from the community, faith and traditional healers, community associations, non-governmental organisations, Zonal, Regional and Federal level government offices, higher education institutions, social work and mental health specialists (psychiatrists and psychiatric nurses). The objective of this study is to report the process of implementing the ToC approach in developing mental health care plan. A total of 46 persons participated in four ToC workshops. Four critical path dimensions were identified: community, health facility, administrative and higher level care organisation. The ToC participants were actively engaged in the process and the ToC encouraged strong commitment among participants. Key opportunities and barriers to implementation and how to overcome these were suggested. During the workshops, a map incorporating the key agreed outcomes and outcome indicators was developed and finalized later

  15. 25 CFR 47.8 - Who develops the local educational financial plans?

    Science.gov (United States)

    2010-04-01

    ... Section 47.8 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR EDUCATION UNIFORM DIRECT FUNDING AND SUPPORT FOR BUREAU-OPERATED SCHOOLS § 47.8 Who develops the local educational financial plans? The local Bureau-operated school supervisor develops the local educational financial plan in active...

  16. A development plan for the south-eastern part of Pag island with an emphasis on olive-growing

    Directory of Open Access Journals (Sweden)

    Vesna Koščak Miočić-Stošić

    2014-01-01

    Full Text Available Regardless of the fact that the traditional usage of rural landscapes was agricultural, a degradation of landscape values, as well as an onset of natural succession, occur due to contemporary lifestyle. This can lead to negative effects regarding land-use change. This paper focuses on the south-eastern part of Pag island and explores the possibilities for the revitalisation of its neglected areas by envisioning its future development as an olive-growing region. The final goal was to define a planning procedure framework which would enable the creation of a strategic vision to be transformed into a comprehensive spatial development strategy for the research area. This area encompasses the territory between Kaštela in the north-west and the Pag’s bridge in the south-east which administratively belongs to the Zadar County and includes the Town of Pag, and the Kolan and Povljana municipalities. Olive-growing has been recognized as the strategic choice for development because of its tradition in the area and the potential integration with other relatable activities. Based on the SWOT analysis, an appropriate mission, a vision and strategic goals were defined for developing Pag as an olive-growing region. Further landscape planning methods included (1 the Lynch mapping analysis, (2 the Forman and Godron landscape ecology analysis and (3 the landscape pattern analysis. The results were then used together with digital orthophoto imagery to overlay and analyse relevant information. Hand drawings as well as AutoCAD, ArcGIS and image editing computer programmes were used in the process. This analytical phase was then followed by the development of several alternative spatial zonings, diagrams and concepts based on a preferable neighbourhood matrix and the activity sizing table. The planning process resulted in a concept for spatial development of the research area which would enable the implementation of the strategic vision. The main goal of this

  17. Final report of advisory subcommittee on development of JENDL. Guideline for developing next JENDL

    International Nuclear Information System (INIS)

    Chiba, Go

    2016-01-01

    An advisory subcommittee on development of JENDL was established in 2013 to discuss future development of JENDL among experts on nuclear data experiments, evaluations and applications. This paper is a summary of a final report which was submitted to the JENDL committee on March in 2014. (author)

  18. Development of a plan for a national LLW information management system based on data acquired from a uniform manifest

    International Nuclear Information System (INIS)

    Gingerich, R.; Shimer, R.P.

    1986-01-01

    The Western Governors' Association (WGA), with funding from the Department of Energy's (DOE) National Low-Level Radioactive Waste Management Program, has completed an 18-month national project to develop a plan for a national low-level waste (LLW) information management system based on data from a uniform manifest for shipments of LLW. Under the plan, waste generators would fill out a manifest for a shipment just as they do currently, but they would use a nationally standard form. Shortly after a shipment arrives at a disposal facility or a processor, data from the manifest would be entered into the Program's Low-Level Waste Information Management System (LLWIMS). The data would be available via computer to state, compact and federal officials. This paper provides an overview of the plan for implementing and operating a national information management system linked to manifest data. It reports on the progress that has been made toward implementing the system and outlines the work that remains to be done. Finally, the paper examines the crucial role the system will play in the development of an acceptable system for managing the nation's LLW, particularly in the post-1986 transition period

  19. Energy Conservation and Development Plan. Southern Tier Central Region, New York

    Energy Technology Data Exchange (ETDEWEB)

    1979-07-01

    A summary is presented of the work of 40 volunteers working with regional planners to imagine, assess, and prescribe for the development of local energy resources (wind, solar, biomass, and water) and for conservation of all forms of energy. The plan contains a brief summary of the process the citizens followed in formulating the plan, the plans themselves, and appendices which contain more detailed comments by citizens on the possible consequences of the development of each resource. The areas (Chemung, Steuben, and Schuyler counties) experienced severe natural gas curtailments during the winter of 1976-1977. The formulation of an emergency energy conservation plan is also presented.

  20. Energy and nuclear power planning in developing countries

    International Nuclear Information System (INIS)

    1985-01-01

    In this publication of the IAEA, after the introduction, four substantive parts follow. Part I, Energy demand and rational energy supply, deals with the needs for energy, primary energy resources and reserves, energy transport, storage, distribution and conservation, including the environmental effects on energy development. Part II, Economic aspects of energy development, presents an integrated view of the basic concepts of energy economics, evaluation of alternative energy projects with an in-depth comparison of electricity generation costs of nuclear and fossil-fuelled power plants. Part III, World energy development status and trends, begins with an overview of the world energy status and trends and continues with a presentation of the energy situation in industrialized countries and in developing countries. Part IV, Energy planning, deals with the optimization techniques, energy planning concepts and computerized models. The launching conditions and implementation of a nuclear power programme are described in detail. 582 references are given in the text and a bibliographical list of 356 titles has been added

  1. Development of a Whole Body Atlas for Radiation Therapy Planning and Treatment Optimization

    International Nuclear Information System (INIS)

    Qatarneh, Sharif

    2006-01-01

    The main objective of radiation therapy is to obtain the highest possible probability of tumor cure while minimizing adverse reactions in healthy tissues. A crucial step in the treatment process is to determine the location and extent of the primary tumor and its loco regional lymphatic spread in relation to adjacent radiosensitive anatomical structures and organs at risk. These volumes must also be accurately delineated with respect to external anatomic reference points, preferably on surrounding bony structures. At the same time, it is essential to have the best possible physical and radiobiological knowledge about the radiation responsiveness of the target tissues and organs at risk in order to achieve a more accurate optimization of the treatment outcome. A computerized whole body Atlas has therefore been developed to serve as a dynamic database, with systematically integrated knowledge, comprising all necessary physical and radiobiological information about common target volumes and normal tissues. The Atlas also contains a database of segmented organs and a lymph node topography, which was based on the Visible Human dataset, to form standard reference geometry of organ systems. The reference knowledge base and the standard organ dataset can be utilized for Atlas-based image processing and analysis in radiation therapy planning and for biological optimization of the treatment outcome. Atlas-based segmentation procedures were utilized to transform the reference organ dataset of the Atlas into the geometry of individual patients. The anatomic organs and target volumes of the database can be converted by elastic transformation into those of the individual patient for final treatment planning. Furthermore, a database of reference treatment plans was started by implementing state-of-the-art biologically based radiation therapy planning techniques such as conformal, intensity modulated, and radio biologically optimized treatment planning. The computerized Atlas can

  2. The Federal Big Data Research and Development Strategic Plan

    Data.gov (United States)

    Networking and Information Technology Research and Development, Executive Office of the President — Summary: This Plan is an important milestone in the Administrations Big Data Research and Development (R&D) Initiative

  3. HAZWDDD [Hazardous Waste Development, Demonstration, and Disposal]: An exercise in corporate planning

    International Nuclear Information System (INIS)

    McGinnis, C.P.; Pechin, W.H.

    1988-01-01

    Both Energy Systems corporate management and US Department of Energy's Oak Ridge Operations Office (DOE-ORO) management have recognized the seriousness of these problems and have established several programs to determine acceptable courses of action. A plan has been developed for low-level radioactive waste (LLW), and an active dialogue pertaining to LLW is maintained with the state and federal regulators. During 1986, DOE-ORO and Energy Systems identified the need for a plan to address hazardous and mixed wastes. Each installation supports the concept of HAZWDDD through funding and the development of individual HAZWDDD implementation plans. A corporate plan is being developed to integrate the issues discussed in the five installation plans. This paper describes the approach taken in collecting the necessary information for the plan, some of the techniques used in analyzing the information provided, preliminary data that have been collected in preparation of this plan, the identification of common concerns and issues, and the integration of this information into a corporate approach to mixed and hazardous waste management. 1 fig., 5 tabs

  4. National climate change action plans: Interim report for developing and transition countries

    Energy Technology Data Exchange (ETDEWEB)

    Benioff, R.; Ness, E.; Hirst, J. [eds.

    1997-10-01

    Under its Support for National Action Plans (SNAP) initiative, the U.S. Country Studies Program is providing financial and technical assistance to 18 countries for the development of climate change action plans. Although most of the countries have not yet completed their plans, the important lessons learned thus far are valuable and should be shared with other countries and international institutions that have an interest in the process of action plan development. This interim report describes the experience of 11 countries that are the furthest along in their planning activity and who have offered to share their results to date with the larger community of interested nations. These action plans delineate specific mitigation and adaptation measures that the countries will implement and integrate into their ongoing development programs. This report focuses on the measures the countries have selected and the methods they used to prepare their action plans. This executive summary presents key lessons and common themes using a structure similar to that used in the individual country chapters.

  5. Long term plan of atomic energy development and utilization

    International Nuclear Information System (INIS)

    1982-01-01

    The atomic energy utilization and development in Japan have progressed remarkably, and already nuclear power generation has borne an important part in electric power supply, while radiation has been utilized in the fields of industry, agriculture, medicine and so on. Now, atomic energy is indispensable for national life and industrial activity. The former long term plan was decided in September, 1978, and the new long term plan should be established since the situation has changed largely. The energy substituting for petroleum has been demanded, and the expectation to nuclear power generation has heightened because it enables stable and economical power supply. The independently developed technology related to atomic energy must be put in practical use. The peaceful utilization of atomic energy must be promoted, while contributing to the nuclear non-proliferation policy. The Atomic Energy Commission of Japan decided the new long term plan to clearly show the outline of the important measures related to atomic energy development and utilization in 10 years hereafter, and the method of its promotion. The basic concept of atomic energy development and utilization, the long term prospect and the concept on the promotion, the method of promoting the development and utilization, and the problems of funds, engineers and location are described. (kako, I.)

  6. 78 FR 21245 - Continuity of Operations Plan

    Science.gov (United States)

    2013-04-10

    ...; Order No. 778] Continuity of Operations Plan AGENCY: Federal Energy Regulatory Commission, DOE. ACTION: Final rule. SUMMARY: In this Final Rule the Commission revises its Continuity of Operations Plan... Commission's Continuity of Operations Plan (COOP) regulations to incorporate its regional offices into the...

  7. Developing strategic plans for effective utilization of research reactors

    International Nuclear Information System (INIS)

    Ridikas, Danas

    2015-01-01

    Strategic plans are indispensable documents for research reactors (RRs) to ensure their efficient, optimized and well managed utilization. A strategic plan provides a framework for increasing utilization, while helping to create a positive safety culture, a motivated staff, a clear understanding of real costs and a balanced budget. A strategic plan should be seen as an essential tool for a responsible manager of any RR, from the smallest critical facility to the largest reactor. Results and lessons learned are shown from the IAEA efforts to help the RR facilities developing strategic plans, provide review and advise services, organize national and regional stakeholder/user workshops, prepare further guidance and recommendations, document and publish guidance documents and other supporting materials.

  8. Developing strategic plans for effective utilization of research reactors

    Energy Technology Data Exchange (ETDEWEB)

    Ridikas, Danas [International Atomic Energy Agency, Vienna (Austria). Dept. of Nuclear Sciences and Applications

    2015-12-15

    Strategic plans are indispensable documents for research reactors (RRs) to ensure their efficient, optimized and well managed utilization. A strategic plan provides a framework for increasing utilization, while helping to create a positive safety culture, a motivated staff, a clear understanding of real costs and a balanced budget. A strategic plan should be seen as an essential tool for a responsible manager of any RR, from the smallest critical facility to the largest reactor. Results and lessons learned are shown from the IAEA efforts to help the RR facilities developing strategic plans, provide review and advise services, organize national and regional stakeholder/user workshops, prepare further guidance and recommendations, document and publish guidance documents and other supporting materials.

  9. Network development plan 1995

    International Nuclear Information System (INIS)

    Anon.

    1995-11-01

    Network plan 1995 concerns several strategic problems, among others environmental policy of power transmission lines. Possibilities of restructuring aerial cable network are described. The state of the existing systems and plans for new network systems are presented. (EG)

  10. 1998 Army Modernization Plan

    Science.gov (United States)

    1998-01-01

    Biological (CB) Protective Duty Uniform (STO) • Biometrics (SRO) • Nanoscience (SRO) • Millimeter Wave Material and Dissemination Technology... Biometrics and Nanoscience SROs will enable the development of advanced NBC detection and characterization systems, including the exploitation of biologically...Requirements Trailers • Procure HEMAT Trailers Figure K-23 K-19 //;<?. U.S. Army 1997Modernization Plan This final fleet assessment, made against the

  11. Deep-Burn Modular Helium Reactor Fuel Development Plan

    Energy Technology Data Exchange (ETDEWEB)

    McEachern, D

    2002-12-02

    This document contains the workscope, schedule and cost for the technology development tasks needed to satisfy the fuel and fission product transport Design Data Needs (DDNs) for the Gas Turbine-Modular Helium Reactor (GT-MHR), operating in its role of transmuting transuranic (TRU) nuclides in spent fuel discharged from commercial light-water reactors (LWRs). In its application for transmutation, the GT-MHR is referred to as the Deep-Burn MHR (DB-MHR). This Fuel Development Plan (FDP) describes part of the overall program being undertaken by the U.S. Department of Energy (DOE), utilities, and industry to evaluate the use of the GT-MHR to transmute transuranic nuclides from spent nuclear fuel. The Fuel Development Plan (FDP) includes the work on fuel necessary to support the design and licensing of the DB-MHR. The FDP is organized into ten sections. Section 1 provides a summary of the most important features of the plan, including cost and schedule information. Section 2 describes the DB-MHR concept, the features of its fuel and the plan to develop coated particle fuel for transmutation. Section 3 describes the knowledge base for fabrication of coated particles, the experience with irradiation performance of coated particle fuels, the database for fission product transport in HTGR cores, and describes test data and calculations for the performance of coated particle fuel while in a repository. Section 4 presents the fuel performance requirements in terms of as-manufactured quality and performance of the fuel coatings under irradiation and accident conditions. These requirements are provisional because the design of the DB-MHR is in an early stage. However, the requirements are presented in this preliminary form to guide the initial work on the fuel development. Section 4 also presents limits on the irradiation conditions to which the coated particle fuel can be subjected for the core design. These limits are based on past irradiation experience. Section 5 describes

  12. Next Generation Nuclear Plant Materials Research and Development Program Plan, Revision 3

    International Nuclear Information System (INIS)

    G.O. Hayner; R.L. Bratton; R.E. Mizia; W.E. Windes; W.R. Corwin; T.D. Burchell; C.E. Duty; Y. Katoh; J.W. Klett; T.E. McGreevy; R.K. Nanstad; W. Ren; P.L. Rittenhouse; L.L. Snead; R.W. Swindeman; D.F. Wlson

    2006-01-01

    This is the 2006 update (Revision 3) of the NGNP Materials Research and Development Program Plan. This law established that the U.S Department of Energy (DOE) Secretary of Energy shall establish a ''Next Generation Nuclear Plant'' (NGNP) project. The NGNP project named in the Act was given the following attributes and guiding principles to manage its development: (1) The NGNP consists of research, development, design (R and DD), construction, and operation of a prototype reactor to generate electricity and hydrogen; (2) The project shall be managed by the DOE Office of Nuclear Energy; (3) The Idaho National Laboratory (INL) shall be the lead DOE laboratory for the NGNP; (4) The INL shall establish collaborations with selected institutions of higher education, other research institutes and international researchers; (5) The INL shall organize an industrial consortium of partners for cost-shared R and DD, construction; (6) The project shall be sited at the INL; (7) The project shall be licensed by the Nuclear Regulatory Commission (NRC) and by July, 2008 the NRC and DOE shall jointly submit a licensing strategy to Congress; (8) The project shall be organized to maximize technical interchange with the nuclear power industry, nuclear power plant construction firms, the chemical process industry and to seek international cooperation, participation and contributions; (9) The Nuclear Energy Research Advisory Committee (NERAC) shall review all program plans for the NGNP; (10) Phase 1 of the project (selection of hydrogen production technology, conduct R and DD and initial design activities) shall be completed no later than September 30, 2011; (11) Phase 2 of the project (continue R and DD, develop final design, apply for a license, construct and start operations) shall be completed by September 30, 2021; and (12) Provision for authorization of appropriations was made. As a result of the direction provided, the INL and the DOE issued an NGNP Preliminary Project Management

  13. Development of transportation asset management decision support tools : final report.

    Science.gov (United States)

    2017-08-09

    This study developed a web-based prototype decision support platform to demonstrate the benefits of transportation asset management in monitoring asset performance, supporting asset funding decisions, planning budget tradeoffs, and optimizing resourc...

  14. STRATEGIC PLANNING IN THE MANAGEMENT OF DEVELOPMENT OF HOUSE-BUILDING ENTERPRISES

    Directory of Open Access Journals (Sweden)

    R. A. Kadyrov

    2014-01-01

    Full Text Available The system of the shaping strategic plan developments house-building enterprises is offered in sloppy condition market. The considered problems and methodical bases of the shaping adaptive strategic plan and tree of the sub goal to main strategic purpose of the development house-buildingenterprises.

  15. Environmental development plan. LWR commercial waste management

    International Nuclear Information System (INIS)

    1980-08-01

    This Environmental Development Plan (EDP) identifies the planning and managerial requirements and schedules needed to evaluate and assess the environmental, health and safety (EH and S) aspects of the Commercial Waste Management Program (CWM). Environment is defined in its broadest sense to include environmental, health (occupational and public), safety, socioeconomic, legal and institutional aspects. This plan addresses certain present and potential Federal responsibilities for the storage, treatment, transfer and disposal of radioactive waste materials produced by the nuclear power industry. The handling and disposal of LWR spent fuel and processed high-level waste (in the event reprocessing occurs) are included in this plan. Defense waste management activities, which are addressed in detail in a separate EDP, are considered only to the extent that such activities are common to the commercial waste management program. This EDP addresses three principal elements associated with the disposal of radioactive waste materials from the commercial nuclear power industry, namely Terminal Isolation Research and Development, Spent Fuel Storage and Waste Treatment Technology. The major specific concerns and requirements addressed are assurance that (1) radioactivity will be contained during waste transport, interim storage or while the waste is considered as retrievable from a repository facility, (2) the interim storage facilities will adequately isolate the radioactive material from the biosphere, (3) the terminal isolation facility will isolate the wastes from the biosphere over a time period allowing the radioactivity to decay to innocuous levels, (4) the terminal isolation mode for the waste will abbreviate the need for surveillance and institutional control by future generations, and (5) the public will accept the basic waste management strategy and geographical sites when needed

  16. Tourists' preferences for ecotourism planning and development ...

    African Journals Online (AJOL)

    Tourists' preferences were: revising the price; improved product quality; creation of scenic viewpoints; improved service quality; improved infrastructure and information on the park as well. The study found that the park managers need to reconsider tourist's preferences while planning and developing ecotourism in Rwanda.

  17. Fly-by-light flight control system technology development plan

    Science.gov (United States)

    Chakravarty, A.; Berwick, J. W.; Griffith, D. M.; Marston, S. E.; Norton, R. L.

    1990-01-01

    The results of a four-month, phased effort to develop a Fly-by-Light Technology Development Plan are documented. The technical shortfalls for each phase were identified and a development plan to bridge the technical gap was developed. The production configuration was defined for a 757-type airplane, but it is suggested that the demonstration flight be conducted on the NASA Transport Systems Research Vehicle. The modifications required and verification and validation issues are delineated in this report. A detailed schedule for the phased introduction of fly-by-light system components has been generated. It is concluded that a fiber-optics program would contribute significantly toward developing the required state of readiness that will make a fly-by-light control system not only cost effective but reliable without mitigating the weight and high-energy radio frequency related benefits.

  18. Integrating climate change into the transportation planning process : final report

    Science.gov (United States)

    2008-07-01

    The objective of this study is to advance the practice and application of transportation planning among state, regional, and local transportation planning agencies to successfully meet growing concerns about the relationship between transportation an...

  19. Gas development plan - Estonia

    International Nuclear Information System (INIS)

    1994-06-01

    The total supply of natural gas to Estonia is provided by the Russian company ''Lentransgas'', a 10 year contract is under negotiation. The gas transmission system is physically a part of the transmission network in the Baltic region which previously operated as an integral part of the USSR gas transmission system. The potential market is too small to justify investment in an alternative pipeline from the North Sea. The general reduction in purchasing power in the former COMECON countries has resulted in a decreased industrial production in Estonia and lead to a steep decline in natural gas consumption in all sectors except households. The Danish firm ''Dansk Olie og Naturgas A/S'' has been requested to assist the Estonian company ''AS Eesti Gaas J.S.C.'' in preparing a gas development plan for Estonia. Phase 1 of this plan aims to provide a detailed description of the status of the existing situation under the headings of gas supply and demand, transmission and distribution, economy and organization. The most important problems related to the current transition of the Estonian gas sector towards operation under market conditions are addressed, focussing on gas supply and market conditions, flow control and metering. The general organization of the gas sector in Estonia is described and possible models for future organization are discussed. Some recommendations are given and areas in need of further investigation are identified. (AB)

  20. Marketing plan of l'Avellà

    OpenAIRE

    Kalashnikova, Ekaterina

    2017-01-01

    Treball Final de Grau. Grau en Administració d'Empreses. Codi: AE1049. Curs acadèmic 2016/2017 This work is part of the Tourism Excellence Plan for the Inter-Municipal Association of Catí, Culla, Benassal and Ares del Maestrat launched by the Valencian Tourism Agency and the Diputación de Castellón in 2017, the objective of which is to improve the competitiveness of these tourist destinations of the interior Castellon. With the development of this Plan it is intended to enhance...

  1. Development of a Carbon Emission Calculations System for Optimizing Building Plan Based on the LCA Framework

    Directory of Open Access Journals (Sweden)

    Feifei Fu

    2014-01-01

    Full Text Available Life cycle thinking has become widely applied in the assessment for building environmental performance. Various tool are developed to support the application of life cycle assessment (LCA method. This paper focuses on the carbon emission during the building construction stage. A partial LCA framework is established to assess the carbon emission in this phase. Furthermore, five typical LCA tools programs have been compared and analyzed for demonstrating the current application of LCA tools and their limitations in the building construction stage. Based on the analysis of existing tools and sustainability demands in building, a new computer calculation system has been developed to calculate the carbon emission for optimizing the sustainability during the construction stage. The system structure and detail functions are described in this paper. Finally, a case study is analyzed to demonstrate the designed LCA framework and system functions. This case is based on a typical building in UK with different plans of masonry wall and timber frame to make a comparison. The final results disclose that a timber frame wall has less embodied carbon emission than a similar masonry structure. 16% reduction was found in this study.

  2. Mobile Technology for Improved Family Planning (MOTIF): the development of a mobile phone-based (mHealth) intervention to support post-abortion family planning (PAFP) in Cambodia.

    Science.gov (United States)

    Smith, Chris; Vannak, Uk; Sokhey, Ly; Ngo, Thoai D; Gold, Judy; Free, Caroline

    2016-01-05

    The objective of this paper is to outline the formative research process used to develop the MOTIF mobile phone-based (mHealth) intervention to support post-abortion family planning in Cambodia. The formative research process involved literature reviews, interviews and focus group discussions with clients, and consultation with clinicians and organisations implementing mHealth activities in Cambodia. This process led to the development of a conceptual framework and the intervention. Key findings from the formative research included identification of the main reasons for non-use of contraception and patterns of mobile phone use in Cambodia. We drew on components of existing interventions and behaviour change theory to develop a conceptual framework. A multi-faceted voice-based intervention was designed to address health concerns and other key determinants of contraception use. Formative research was essential in order to develop an appropriate mHealth intervention to support post-abortion contraception in Cambodia. Each component of the formative research contributed to the final intervention design.

  3. CHP plant Legionowo Poland - Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-12-01

    In 1997, a new Energy Law was passed in Poland. An important element of the law is that local energy planning is made obligatory. The law describes obligatory tasks and procedures for Polish municipalities related to planning and organisation of the energy sector. With the objective of supporting the Polish municipalities in their obligations according to the energy law of 1997, the project 'Energy Planning in Poland at Municipal Level - Support to Decision Makers' was launched. As part of the project, Municipal Guideline Reports have been elaborated for three model municipalities. These guidelines present the basis for the Energy Supply Plans in these municipalities. For the city of Legionowo, the following was recommended: 1. The planning processes initiated during the project should be continues/followed up, 2. Master Plan for the district heating system should be prepared, 3. The possibilities of establishment of a major natural gas-fired CHP plant of the Combined Cycle type should be investigated. The present report is the final Master Plan based on the following reports: Master Plan for Legionowo - Status Report; Master Plan for Legionowo - Hydraulic Analysis; CHP Plant Legionowo Poland - CHP Feasibility Analysis. The final Master Plan describes the status in the DH Company in Legionowo, possible improvements and an investment plan for the selected scenario. (BA)

  4. Developing a regional energy plan for two counties in Ireland

    DEFF Research Database (Denmark)

    Connolly, David; Mathiesen, Brian Vad; Lund, Henrik

    2011-01-01

    Developing a sustainable energy supply will most likely require a transition from large-scale centralised plants to decentralised distributed generation. Consequently, local planning authorities will play a more important role in energy planning in the coming years, as more decentralised energy f...

  5. Career Mapping for Professional Development and Succession Planning.

    Science.gov (United States)

    Webb, Tammy; Diamond-Wells, Tammy; Jeffs, Debra

    Career mapping facilitates professional development of nurses by education specialists and nurse managers. On the basis of national Nursing Professional Development Scope and Standards, our education and professional development framework supports the organization's professional practice model and provides a foundation for the professional career map. This article describes development, implementation, and evaluation of the professional career map for nurses at a large children's hospital to support achievement of the nursing strategic goals for succession planning and professional development.

  6. The Personal Development Plan Practice Questionnaire: The Development and Validation of an Instrument to Assess the Employee's Perception of Personal Development Plan Practice

    Science.gov (United States)

    Beausaert, Simon; Segers, Mien; Gijselaers, Wim

    2011-01-01

    Confronted with the speed of technological advancements and increasing global competition, organizations have come to realize that their employees' continuous learning drives business success. A popular tool to support and enhance continuous learning is the personal development plan (PDP). Despite its popularity, empirical evidence of the…

  7. Planning Environmental Impact Assessment Orienting Sustainable Development:Opportunities and Challenges

    Institute of Scientific and Technical Information of China (English)

    Sun Yanjun; Chen Xingeng; Bao Yun; Peng Xiaochun; Gao Changbo

    2005-01-01

    Strategic Environmental Assessment is a frontier subject in the field of Environmental Impact Assessment. In the past two decades, especially in recent years, much more importance has been attached to Strategic Environmental Assessment. The Environmental Impact Assessment Law of the P.R.China which was promulgated provides a great opportunity for the development of Planning Environmental Impact Assessment and brings great challenges for the development of traditional Project Environmental Impact Assessment and Planning Environmental Impact Assessment at the same time.In order to promote the implementation of"The EIA Law", the inherent limitations of Project Environmental Impact Assessment must be identified sufficiendy and the theory research and practice of Planning Environmental Impact Assessment should be strengthened as well. Measures should be taken currendy to enforce the operation system. The authors wish to offer a few references to the progress and implementation of Planning Environmental Impact Assessment in China.

  8. Final Hanford Site Transuranic (TRU) Waste Characterization Qualit Assurance Project Plan

    International Nuclear Information System (INIS)

    GREAGER, T.M.

    1999-01-01

    The Transuranic Waste Characterization Quality Assurance Program Plan required each U.S. Department of Energy (DOE) site that characterizes transuranic waste to be sent the Waste Isolation Pilot Plan that addresses applicable requirements specified in the quality assurance project plan (QAPP)

  9. Environmental development plan for transportation programs: FY80 update

    Energy Technology Data Exchange (ETDEWEB)

    Saricks, C.L.; Singh, M.K.; Bernard, M.J. III; Bevilacqua, O.M.

    1980-09-01

    This is the second annual update of the environmental development plan (EDP) for transportation programs. It has been prepared as a cooperative effort of the Assistant Secretaries for Conservation and Solar Energy (ASCS) Office of Transportation Programs (CS/TP) and the Environment (ASEV) Office of Environmental Assessments. EDPs identify the ecosystem, resource, physical environment, health, safety, socioeconomic, and environmental control concerns associated with DOE programs. The programs include the research, development, demonstration, and assessment (RDD and A) of 14 transportation technologies and several strategy implementation projects. This EDP update presents a research and assessment plan for resolving any potentially adverse environmental concerns arising from these programs. The EDP process provides a framework for: incorporating environmental concerns into CS/TP planning and decision processes early to ensure they are assigned the same importance as technological, fiscal, and institutional concerns in decision making; resolving environmental concerns concurrently with energy technology and strategy development; and providing a research schedule that mitigates adverse environmental effects through sound technological design or policy analysis. This EDP also describes the status of each environmental concern and the plan for its resolution. Much of ongoing DOE reseirch and technology development is aimed at resolving concerns identified in this EDP. Each EDP is intended to be so comprehensive that no concerns escape notice. Care is taken to include any CS/TP action that may eventually require an Environmental Impact Statement. Because technology demonstration and commercialization tend to raise more environmental concerns than other portions of the transportation program, most of this EDP addresses these concerns.

  10. Employee Motivation for Personal Development Plan Effectiveness

    Science.gov (United States)

    Eisele, Lisa; Grohnert, Therese; Beausaert, Simon; Segers, Mien

    2013-01-01

    Purpose: This article aims to understand conditions under which personal development plans (PDPs) can effectively be implemented for professional learning. Both the organization's manner of supporting the PDP practice as well as the individual employee's motivation is taken into account. Design/ methodology/approach: A questionnaire was…

  11. Static and Completion Analysis for Planning Knowledge Base Development and Verification

    Science.gov (United States)

    Chien, Steve A.

    1996-01-01

    A key obstacle hampering fielding of AI planning applications is the considerable expense of developing, verifying, updating, and maintaining the planning knowledge base (KB). Planning systems must be able to compare favorably in terms of software lifecycle costs to other means of automation such as scripts or rule-based expert systems.

  12. Developing a Markup Language for Encoding Graphic Content in Plan Documents

    Science.gov (United States)

    Li, Jinghuan

    2009-01-01

    While deliberating and making decisions, participants in urban development processes need easy access to the pertinent content scattered among different plans. A Planning Markup Language (PML) has been proposed to represent the underlying structure of plans in an XML-compliant way. However, PML currently covers only textual information and lacks…

  13. Rural Planning in Regional Development: The Kenyan Experience ...

    African Journals Online (AJOL)

    Newly independent governments of Asia and Africa embarked on comprehensive ... had proved very effective in assisting European countries to recover from the destruction ... rural development planning and management, poverty alleviation ...

  14. National Aeronautics and Space Administration FY 02 Revised Final Annual Performance Plan

    Science.gov (United States)

    2002-01-01

    The Government Performance and Results Act (GPRA) was passed by Congress and signed by the President in 1993. GPRA was enacted to improve the efficiency of all Federal agencies, with the following specific goals: (1) Improve Federal program management, effectiveness, and public accountability; (2) Improve Congressional decision making on where to commit the Nation's financial and human resources; and (3) Improve citizen confidence in government performance. GPRA directs Executive Branch agencies to develop a customer-focused strategic plan that aligns activities with concrete missions and goals. The Act directs agencies to manage and measure results to justify Congressional appropriations and authorizations. The Report Consolidation Act of 2000 directs agencies to provide a report on the degree of success in achieving the goals and performance measures defined in the strategic and performance plans one hundred and fifty days after the completion of the fiscal year.

  15. Analysis of Propagation Plans in NSF-Funded Education Development Projects

    Science.gov (United States)

    Stanford, Courtney; Cole, Renee; Froyd, Jeff; Henderson, Charles; Friedrichsen, Debra; Khatri, Raina

    2017-08-01

    Increasing adoption and adaptation of promising instructional strategies and materials has been identified as a critical component needed to improve science, technology, engineering, and mathematics (STEM) education. This paper examines typical propagation practices and resulting outcomes of proposals written by developers of educational innovations. These proposals were analyzed using the Designing for Sustained Adoption Assessment Instrument (DSAAI), an instrument developed to evaluate propagation plans, and the results used to predict the likelihood that a successful project would result in adoption by others. We found that few education developers propose strong propagation plans. Afterwards, a follow-up analysis was conducted to see which propagation strategies developers actually used to help develop, disseminate, and support their innovations. A web search and interviews with principal investigators were used to determine the degree to which propagation plans were actually implemented and to estimate adoption of the innovations. In this study, we analyzed 71 education development proposals funded by the National Science Foundation and predicted that 80% would be unsuccessful in propagating their innovations. Follow-up data collection with a subset of these suggests that the predictions were reasonably accurate.

  16. Plans for Managing Hanford Remote Handled Transuranic (TRU) Waste

    International Nuclear Information System (INIS)

    MCKENNEY, D.E.

    2001-01-01

    The current Hanford Site baseline and life-cycle waste forecast predicts that approximately 1,000 cubic meters of remote-handled transuranic (RH-TRU) waste will be generated by waste management and environmental restoration activities at Hanford. These 1,000 cubic meters, comprised of both transuranic and mixed transuranic (TRUM) waste, represent a significant portion of the total estimated inventory of RH-TRU to be disposed of at the Waste Isolation Pilot Plant (WIPP). A systems engineering approach is being followed to develop a disposition plan for each RH-TRU/TRUM waste stream at Hanford. A number of significant decision-making efforts are underway to develop and finalize these disposition plans, including: development and approval of a RH-TRU/TRUM Waste Project Management Plan, revision of the Hanford Waste Management Strategic Plan, the Hanford Site Options Study (''Vision 2012''), the Canyon Disposal Initiative Record-of-Decision, and the Hanford Site Solid (Radioactive and Hazardous) Waste Program Environmental Impact Statement (SW-EIS). Disposition plans may include variations of several options, including (1) sending most RH-TRU/TRUM wastes to WIPP, (2) deferrals of waste disposal decisions in the interest of both efficiency and integration with other planned decision dates and (3) disposition of some materials in place consistent with Department of Energy Orders and the regulations in the interest of safety, risk minimization, and cost. Although finalization of disposition paths must await completion of the aforementioned decision documents, significant activities in support of RH-TRU/TRUM waste disposition are proceeding, including Hanford participation in development of the RH TRU WIPP waste acceptance criteria, preparation of T Plant for interim storage of spent nuclear fuel sludge, sharing of technology information and development activities in cooperation with the Mixed Waste Focus Area, RH-TRU technology demonstrations and deployments, and

  17. Process development work plan for waste feed delivery system

    International Nuclear Information System (INIS)

    Papp, I.G.

    1998-01-01

    This work plan defines the process used to develop project definition for Waste Feed Delivery (WFD). Project definition provides the direction for development of definitive design media required for the ultimate implementation of operational processing hardware and software. Outlines for the major deliverables are attached as appendices. The implementation of hardware and software will accommodate requirements for safe retrieval and delivery of waste currently stored in Hanford's underground storage tanks. Operations and maintenance ensure the availability of systems, structures, and components for current and future planned operations within the boundary of the Tank Waste Remediation System (TWRS) authorization basis

  18. Core science and technology development plan for indirect-drive ICF ignition. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Powell, H.T.; Kilkenny, J.D. [eds.

    1995-12-01

    To define the development work needed to support inertial confinement fusion (ICF) program goals, the authors have assembled this Core Science and Technology (CS and T) Plan that encompasses nearly all science research and technology development in the ICF program. The objective of the CS and T Plan described here is to identify the development work needed to ensure the success of advanced ICF facilities, in particular the National Ignition Facility (NIF). This plan is intended as a framework to facilitate planning and coordination of future ICF programmatic activities. The CS and T Plan covers all elements of the ICF program including laser technology, optic manufacturing, target chamber, target diagnostics, target design and theory, target components and fabrication, and target physics experiments. The CS and T Plan has been divided into these seven different technology development areas, and they are used as level-1 categories in a work breakdown structure (WBS) to facilitate the organization of all activities in this plan. The scope of the CS and T Plan includes all research and development required to support the NIF leading up to the activation and initial operation as an indirect-drive facility. In each of the CS and T main development areas, the authors describe the technology and issues that need to be addressed to achieve NIF performance goals. To resolve all issues and achieve objectives, an extensive assortment of tasks must be performed in a coordinated and timely manner. The authors describe these activities and present planning schedules that detail the flow of work to be performed over a 10-year period corresponding to estimated time needed to demonstrate fusion ignition with the NIF. Besides the benefits to the ICF program, the authors also discuss how the commercial sector and the nuclear weapons science may profit from the proposed research and development program.

  19. Core science and technology development plan for indirect-drive ICF ignition. Revision 1

    International Nuclear Information System (INIS)

    Powell, H.T.; Kilkenny, J.D.

    1995-12-01

    To define the development work needed to support inertial confinement fusion (ICF) program goals, the authors have assembled this Core Science and Technology (CS and T) Plan that encompasses nearly all science research and technology development in the ICF program. The objective of the CS and T Plan described here is to identify the development work needed to ensure the success of advanced ICF facilities, in particular the National Ignition Facility (NIF). This plan is intended as a framework to facilitate planning and coordination of future ICF programmatic activities. The CS and T Plan covers all elements of the ICF program including laser technology, optic manufacturing, target chamber, target diagnostics, target design and theory, target components and fabrication, and target physics experiments. The CS and T Plan has been divided into these seven different technology development areas, and they are used as level-1 categories in a work breakdown structure (WBS) to facilitate the organization of all activities in this plan. The scope of the CS and T Plan includes all research and development required to support the NIF leading up to the activation and initial operation as an indirect-drive facility. In each of the CS and T main development areas, the authors describe the technology and issues that need to be addressed to achieve NIF performance goals. To resolve all issues and achieve objectives, an extensive assortment of tasks must be performed in a coordinated and timely manner. The authors describe these activities and present planning schedules that detail the flow of work to be performed over a 10-year period corresponding to estimated time needed to demonstrate fusion ignition with the NIF. Besides the benefits to the ICF program, the authors also discuss how the commercial sector and the nuclear weapons science may profit from the proposed research and development program

  20. Cumulative effects of planned industrial development and climate change on marine ecosystems

    Directory of Open Access Journals (Sweden)

    Cathryn Clarke Murray

    2015-07-01

    Full Text Available With increasing human population, large scale climate changes, and the interaction of multiple stressors, understanding cumulative effects on marine ecosystems is increasingly important. Two major drivers of change in coastal and marine ecosystems are industrial developments with acute impacts on local ecosystems, and global climate change stressors with widespread impacts. We conducted a cumulative effects mapping analysis of the marine waters of British Columbia, Canada, under different scenarios: climate change and planned developments. At the coast-wide scale, climate change drove the largest change in cumulative effects with both widespread impacts and high vulnerability scores. Where the impacts of planned developments occur, planned industrial and pipeline activities had high cumulative effects, but the footprint of these effects was comparatively localized. Nearshore habitats were at greatest risk from planned industrial and pipeline activities; in particular, the impacts of planned pipelines on rocky intertidal habitats were predicted to cause the highest change in cumulative effects. This method of incorporating planned industrial development in cumulative effects mapping allows explicit comparison of different scenarios with the potential to be used in environmental impact assessments at various scales. Its use allows resource managers to consider cumulative effect hotspots when making decisions regarding industrial developments and avoid unacceptable cumulative effects. Management needs to consider both global and local stressors in managing marine ecosystems for the protection of biodiversity and the provisioning of ecosystem services.

  1. Environmental restoration and waste management: Robotics technology development program: Robotics 5-year program plan

    International Nuclear Information System (INIS)

    1991-01-01

    This plan covers robotics Research, Development, Demonstration, Testing, activities in the Program for the next five years. These activities range from bench-scale R ampersand D to fullscale hot demonstrations at DOE sites. This plan outlines applications of existing technology to near-term needs, the development and application of enhanced technology for longer-term needs, and an initiation of advanced technology development to meet those needs beyond the five-year plan. The objective of the Robotic Technology Development (RTDP) is to develop and apply robotics technologies that will enable Environmental Restoration and Waste Management operations at DOE sites to be safer, faster and cheaper. Five priority DOE sites were visited in March 1990 to identify needs for robotics technology in ER ampersand WM operations. This 5-Year Program Plan for the RTDP detailed annual plans for robotics technology development based on identified needs. This 5-Year Program Plan discusses the overall approach to be adopted by the RTDP to aggressively develop robotics technology and contains discussions of the Program Management Plan, Site Visit and Needs Summary, Approach to Needs-Directed Technical Development, Application-Specific Technical Development, and Cross-Cutting and Advanced Technology. Integrating application-specific ER ampersand WM needs, the current state of robotics technology, and the potential benefits (in terms of faster, safer, and cheaper) of new technology, the Plan develops application-specific road maps for robotics RDDT ampersand E for the period FY 1991 through FY 1995. In addition, the Plan identifies areas where longer-term research in robotics will have a high payoff in the 5- to 20-year time frame. 12 figs

  2. MO-FG-BRA-01: Development of An Image-Guided Dosimetric Planning System for Injectable Brachytherapy Using ELP Nanoparticles

    Energy Technology Data Exchange (ETDEWEB)

    Lafata, K [Duke University, Durham, North Carolina (United States); Duke University Medical Center, Durham, NC (United States); Schaal, J; Liu, W [Duke University, Durham, North Carolina (United States); Cai, J [Duke University Medical Center, Durham, NC (United States)

    2015-06-15

    Purpose: To develop, validate, and evaluate a methodology for determining dosimetry for intratumoral injections of elastin-like-polypeptide (ELP) brachytherapy nanoparticles. These organic-polymer-based nanoparticles are injectable, biodegradable, and genetically tunable. We present a genetically encoded polymer-solution, composed of novel radiolabeled-ELP nanoparticles that are custom-designed to self-assemble into a local source upon intratumoral injection. Our preliminary results of a small animal study demonstrate 100% tumor response, effective radionuclide retention-rates, strong in vivo stability, and no polymer-induced toxicities. While our approach is therefore highly promising for improved brachytherapy, the current workflow lacks a dosimetry framework. Methods: We are developing a robust software framework that provides image-guided dosimetric-planning capabilities for ELP brachytherapy. The user graphically places ELP injection sites within a µCT-planning-image, and independently defines each injection volume, concentration, and radioisotope to be used. The resulting internal dosimetry is then pre-determined by first modeling post-injection ELP advection-diffusion, and then calculating the resulting dose distribution based on a point- dose-kernel-convolution algorithm. We have experimentally measured ELP steady-state concentrations via µSPECT acquisition, and validated our dose calculation algorithm against Monte Carlo simulations of several radioactivity distributions. Finally, we have investigated potential advantages and limitations of various ELP injection parameters. Results: The µSPECT results demonstrated inhomogeneous steady-state distributions of ELP in tissue, and Monte Carlo radioactivity distributions were designed accordingly. Our algorithm yielded a root-mean-square-error of less than 2% for each distribution tested (average root-mean-square-error was 0.73%). Dose-Volume-Histogram analysis of five different plans showed how strategic

  3. Environmental Development Plan (EDP): space applications

    International Nuclear Information System (INIS)

    1978-04-01

    This Environmental Development Plan (EDP) identifies and examines the environmental, safety, health, and socioeconomic (ES and H) issues associated with the ongoing DOE Space Applications Program and the associated research, development, and demonstration programs. The EDP presents an ES and H research and development (R/D) program and strategy for timely resolutions of the issues and satisfaction of the associated requirements necessary for precluding impediments to the space nuclear systems technology. The EDP has been limited to the consideration of: (1) space nuclear power system nuclear fuel fabrication; (2) space nuclear power system heat source fabrication; (3) testing of subsystems and assembled systems; (4) R and D in support of space nuclear system development; (5) nuclear system responses to launch and reentry accidents; and (6) nuclear system environmental behavior and recovery

  4. Discrepancies between selected Pareto optimal plans and final deliverable plans in radiotherapy multi-criteria optimization.

    Science.gov (United States)

    Kyroudi, Archonteia; Petersson, Kristoffer; Ghandour, Sarah; Pachoud, Marc; Matzinger, Oscar; Ozsahin, Mahmut; Bourhis, Jean; Bochud, François; Moeckli, Raphaël

    2016-08-01

    Multi-criteria optimization provides decision makers with a range of clinical choices through Pareto plans that can be explored during real time navigation and then converted into deliverable plans. Our study shows that dosimetric differences can arise between the two steps, which could compromise the clinical choices made during navigation. Copyright © 2016 Elsevier Ireland Ltd. All rights reserved.

  5. tourists' preferences for ecotourism planning and development

    African Journals Online (AJOL)

    A literature review was adopted to better understand the key concepts related to tourist's ... and availability at Nyungwe Forest Lodge, Nyungwe tope View Hill Hotel, Gisakura .... A recent trail management plan for the park developed in 2012 suggested the .... marketing strategy to promote the tea tourism image in Rwanda.

  6. Accounting for uncertainty in evaluating water quality impacts of urban development plan

    International Nuclear Information System (INIS)

    Zhou Jiquan; Liu Yi; Chen Jining

    2010-01-01

    The implementation of urban development plans causes land use change, which can have significant environmental impacts. In light of this, environmental concerns should be considered sufficiently at an early stage of the planning process. However, uncertainties existing in urban development plans hamper the application of strategic environmental assessment, which is applied to evaluate the environmental impacts of policies, plans and programs. This study develops an integrated assessment method based on accounting uncertainty of environmental impacts. And the proposed method consists of four main steps: (1) designing scenarios of economic scale and industrial structure, (2) sampling for possible land use layouts, (3) evaluating each sample's environmental impact, and (4) identifying environmentally sensitive industries. In doing so, uncertainties of environmental impacts can be accounted. Then environmental risk, overall environmental pressure and potential extreme environmental impact of urban development plans can be analyzed, and environmentally sensitive factors can be identified, especially under considerations of uncertainties. It can help decision-makers enhance environmental consideration and take measures in the early stage of decision-making.

  7. Repository documentation rethought. A comprehensive approach from untreated waste to waste packages for final disposal

    Energy Technology Data Exchange (ETDEWEB)

    Anthofer, Anton Philipp; Schubert, Johannes [VPC GmbH, Dresden (Germany)

    2017-11-15

    The German Act on Reorganization of Responsibility for Nuclear Disposal (Entsorgungsuebergangsgesetz (EntsorgUebG)) adopted in June 2017 provides the energy utilities with the new option of transferring responsibility for their waste packages to the Federal Government. This is conditional on the waste packages being approved for delivery to the Konrad final repository. A comprehensive approach starts with the dismantling of nuclear facilities and extends from waste disposal and packaging planning to final repository documentation. Waste package quality control measures are planned and implemented as early as in the process qualification stage so that the production of waste packages that are suitable for final deposition can be ensured. Optimization of cask and loading configuration can save container and repository volume. Workflow planning also saves time, expenditure and exposure time for personnel at the facilities. VPC has evaluated this experience and developed it into a comprehensive approach.

  8. Developing The Organized Village of Kasaan's Strategic Energy Plan

    Energy Technology Data Exchange (ETDEWEB)

    Hamar, Glenn P. [The Organized Village of Kasaan, Ketchikan, AK (United States)

    2013-02-01

    The overall goal of this project is to create a Tribal Energy Action Plan that will serve as the Tribe's blueprint for creating long term energy self sufficiency. The Plan will be developed with input from a committed group of key stakeholders and landowners in the area, will be based on sound data and research, and will address both supply side options of the development of sustainable energy sources, as well as demand-side options for reducing energy consumption. The resulting plan will include defined comprehensive energy strategies and built upon a baseline assessment of where the Tribe currently is in terms of alternative and renewable energy activities; a vision of where the Tribe wants to go; and an action plan of how the Tribe will reach its vision including the identification of viable energy options based on the long-term strategic plan of the Tribe.

  9. National energy planning with nuclear option

    International Nuclear Information System (INIS)

    Soetrisnanto, Arnold Y.; Hastowo, Hudi; Soentono, Soedyartomo

    2002-01-01

    National energy planning with nuclear option. Energy planning development is a part of the sustainable development that supports the attainment of national development goals. The objective of the study is to support the national planning and decision-making process in the energy and electric sector in Indonesia with nuclear option for period of 1998-2027. This study performs the provision of detailed economic sector and regional energy demand projection by MAED simulation model based on the economic and population scenarios. The optimization of the future energy supply such as electricity supply taking all known Indonesian energy sources and all relevant technologies into consideration by MARKAL Model. The results shows that Indonesia's need for final energy is forecasted to increase two times, from 4028,4 PJ at the beginning of study become 8145,6 PJ at the end of study. Performing the sensitivity study, it is predicted that nuclear energy could be introduced in the Java-Bali electricity grid about year 2016

  10. Development Application - Terra Nova Development - Canada-Newfoundland Benefits Plan

    International Nuclear Information System (INIS)

    1996-01-01

    The Canada-Newfoundland Benefits Plan, part of the overall application to develop the Terra Nova Field off the coast of Newfoundland details the benefits to Canadians, but most particularly to residents of Newfoundland and Labrador that a vibrant petroleum industry is expected to bring. In this document the proponents commit themselves to a course of action designed to enhance the opportunities for Canadian and Newfoundland participation in the development, in accordance with the Atlantic Accord legislation. In terms of this legislation, the project proponents are obliged to perform development functions from Newfoundland, acquire goods and services for the Terra Nova Development on a 'best value' basis, but consistent with the procurement policies and procedures for benefits. The proponents must consider Canadian and, in particular, Newfoundland benefits as one of the factors in the procurement of goods and services, and require contactors and subcontractors to adhere to the development's benefits principles, objectives and commitments. A 7-page glossary is also included

  11. Industrial developments challenging planning and research endeavours around Songkla Lake

    DEFF Research Database (Denmark)

    Jørgensen, Ulrik; Lauridsen, Erik Hagelskjær

    2004-01-01

    had several broad committees engaged in supporting these planning issues and resolve the conflicts be-tween different stakeholder interests in the regions development. The paper gives an overview over the types of problems that have been addressed in these major plans and studies and the types......, but the specific outcomes of the planning and the scientific result seem to be rather limited. In an attempt to find an explanation to this gap between planning and advice on one hand and the implementation on the other, it is important not only to look for policy answers. These would typically be ‘lack...

  12. Land use planning for sustainable development of peri-urban zones

    Directory of Open Access Journals (Sweden)

    Živanović-Miljković Jelena

    2012-01-01

    Full Text Available Taking into consideration that growth of urban population has impacts on land use and that managing urban population change is one of the most important contemporary challenges, this paper deals with the sustainable development of peri-urban zones which represent important an environment where employment opportunities are developed and resources exploited (particularly agricultural resources and environment where important recreational and leisure activities could be pursued. Within the review of current concepts and planning practices, the concepts of multifunctional agriculture and multifunctional landscapes in peri-urban zones are pointed out, as well as EU Developing Periurban Projects. The paper particularly focuses on the current situation in Serbia, where there is no specific legal basis for the planning of peri-urban areas, although there are positive examples of strategies, regulations and planning documents which treat agriculture and greenery in peri-urban zones in a sustainable manner.

  13. Kenya's Climate Change Action Plan. Low Carbon Climate Resilient Development Pathway

    Energy Technology Data Exchange (ETDEWEB)

    Murphy, D.; Sawyer, D.; Stiebert, S.; McFatridge, S. [International Institute for Sustainable Development IISD, Winnipeg, Manitoba (Canada); Wuertenberger, L.; Van Tilburg, X.; Hekkenberg, M. [Energy research Centre of the Netherlands ECN, Policy Studies, Amsterdam (Netherlands); Owino, T.; Battye, W. [ClimateCare, Nairobi (Kenya); Mutia, T. [Regional Institute for Social Enterprise Kenya RISE, Nairobi (Kenya); Olum, P. [Climate Change Consultant (Kenya)

    2012-12-15

    Kenya Vision 2030 - the long-term development blueprint for the country - aims to transform Kenya into 'a newly industrialising, middle-income country providing a high quality of life to all its citizens in a clean and secure environment'. A low carbon climate resilient development pathway, as set out in this Climate Change Action Plan, can help meet Vision 2030 goals through actions that address both sustainable development and climate change. This pathway can also help the Government achieve the Millennium Development Goals and other internationally agreed development goals without compromising the environment and its natural resources. As Kenya realizes its development aspirations, there will be gains and risks. A growing population and economy with migration to cities will mean increases in greenhouse gas (GHG) emissions. Resulting environmental and social conditions, including increased competition over resources, could intensify vulnerability to climate risks. Transitioning to a low carbon climate resilient development pathway can address future risks thereby improving Kenya's ability to prosper under a changing climate while reducing the emissions intensity of a growing economy. Moving forward on the 2010 National Climate Change Response Strategy will help Kenya transition to a low carbon climate resilient development pathway that puts people and livelihoods at the forefront. The strategy recognized the importance of climate change and development, and this Climate Change Action Plan is the logical next step. A yearlong multistakeholder participatory process involving the public sector, private sector and civil society resulted in this Action Plan that identifies priority climate change actions for Kenya for the short, medium and long term. The Government of Kenya takes climate change and its impact on development seriously. Climate change is considered a crosscutting issue that will be mainstreamed in the planning process both at the national

  14. Sustainable development in city districts: BaLaLuZ project - Bellevaux; Quartier de Bellevaux - Lausanne. Rapport final de la phase 1

    Energy Technology Data Exchange (ETDEWEB)

    Gay, J.-B.; Montavon, M. [Swiss Federal Institute of Technology (EPFL), Laboratoire d' Energie solaire et de physique du batiment (LESO-PB), Lausanne (Switzerland); Muehll, D. von der [Swiss Federal Institute of Technology (EPFL), Laboratoire de Dynamiques territoriales (LADYT), Lausanne (Switzerland); Malatesta, D. [Ecole d' Etudes sociales et pedagogiques (EESP), Lausanne (Switzerland); Cunha, A. da; Dind, J.-P. [University of Lausanne, Institut de Geographie (UNIL-IGUL), Lausanne (Switzerland)

    2004-07-01

    This final report for the Swiss Federal Office of Energy (SFOE) is one of a series of reports concerning municipal development in various cities in Switzerland. The four city districts involved include Basel (Gundeldinger Feld), Lausanne (Bellevaux), Lucerne (Basel-/Bernstrasse) and Zurich (Werdwies). This final report summarises the results of the first phase of the project in the Bellevaux district of Lausanne. The work done in the first phase is reviewed: A database with details on 240 buildings was set up, a pilot analysis of a building was carried out and suggestions for renovation work were made. Also, a socio-economic analysis of the district was made and the expectations of inhabitants were noted. Mobility was critically analysed and first possibilities in the urban planning area were looked at. Recommendations for the second phase of the project are presented.

  15. The ‘Development Plan of National Strategic Emerging Industries Promotes Breakthrough Development of High-end Equipment and New Material Industry

    Institute of Scientific and Technical Information of China (English)

    2017-01-01

    The State Council recently printed and distributed the Notice on the‘Development Plan of National Strategic Emerging Industries for the'Thirteenth Five Year Plan'’(The Plan),which made overall deployment and arrangement for development target,key tasks,

  16. Data integration for statewide transportation planning : final report

    Science.gov (United States)

    2009-08-01

    The goal of this study was to investigate the data availability, accessibility, and interoperability issues arisen from the statewide : transportation planning activities undertaken at WisDOT and to identify possible approaches for addressing these i...

  17. Final Report. Center for Scalable Application Development Software

    Energy Technology Data Exchange (ETDEWEB)

    Mellor-Crummey, John [Rice Univ., Houston, TX (United States)

    2014-10-26

    The Center for Scalable Application Development Software (CScADS) was established as a part- nership between Rice University, Argonne National Laboratory, University of California Berkeley, University of Tennessee – Knoxville, and University of Wisconsin – Madison. CScADS pursued an integrated set of activities with the aim of increasing the productivity of DOE computational scientists by catalyzing the development of systems software, libraries, compilers, and tools for leadership computing platforms. Principal Center activities were workshops to engage the research community in the challenges of leadership computing, research and development of open-source software, and work with computational scientists to help them develop codes for leadership computing platforms. This final report summarizes CScADS activities at Rice University in these areas.

  18. Environmental Development Plan for Transportation Energy Conservation. FY 79 update

    Energy Technology Data Exchange (ETDEWEB)

    Singh, M. K.; Bernard, III, M. J.

    1978-12-15

    This is the first annual update of the Environment Development Plan (EDP) for the DOE Division of Transportation Energy Conservation program. It identifies the ecosystem, resource, physical environment, health, safety, and socioeconomic concerns associated with the division's transportation programs. These programs include the research, development, demonstration and assessment (RDD and A) of seventeen transportation technologies and several strategy and policy development and implementation projects. The transportation technologies projects deal with highway transport including electric vehicles, marine transport and pipeline transport. This EDP presents a research and assessment plan for resolving any potentially adverse environmental concerns stemming from these programs.

  19. Center Planning and Development Student Engineer

    Science.gov (United States)

    Jenkins, Kenneth T.

    2013-01-01

    This fall I was the Student Trainee (Engineering) Pathways Intern (co-op) at the Kennedy Space Center (KSC) in the Center Planning Development (CPD) Directorate. CPD works with commercial companies who are interested using KSCs unique capabilities in spaceflight, spacecraft processing, ground systems and Research Development (RD) projects that fall in line with NASAs mission and goals. CPD is divided into four (4) groups: (1) AD-A, which works on the Master Planning for center, (2) AD-B (where I am), which works on project management and integration, (3) AD-C, which works on partnership development, and (4) AD-T, which works on the RD aspects of partnerships. CPDs main goal is to one day make KSC the worlds largest spaceport and maintain the center as a leader in space exploration. CPD is a very diverse group with employees having a wide knowledge of not only the Space Shuttle, but also that of the Apollo era. Our director of CPD, Scott Colloredo, is on the advisory board for Commercial Space Operations (CSO) and has a degree at ERAU. I worked on a number of different tasks for AD-B, as well as CPD, that includes, but not limited to: reviewing and reissuing engineering drawings from the Apollo and Shuttle eras, to supporting NASA rocket launches (MAVEN), and working on actual agreementsproposals that will be used in the partnership process with multiple partners. Most of the work I have done is sensitive information and cannot be disclosed.

  20. An analytical framework for strategic delta planning : negotiating consent for long-term sustainable delta development

    NARCIS (Netherlands)

    Seijger, C.; Douven, W; Hermans, L.M.; Evers, J.; Phi, H. L.; Brunner, J.; Pols, L.; Ligtvoet, W.; Koole, S.; Slager, K.; Vermoolen, M.S.; Hasan, S.; Hoang, V. T M; van Halsema, G

    2016-01-01

    Sectoral planning on water, agriculture and urban development has not been able to prevent increased flood risks and environmental degradation in many deltas. Governments conceive strategic delta planning as a promising planning approach and develop strategic delta plans. Such plans are linked to

  1. Are master plans effective in limiting development in China's disaster-prone areas?

    OpenAIRE

    Kim, Saehoon; Rowe, Peter G.

    2013-01-01

    The effectiveness of urban master plans in limiting development in a disaster-prone area of China was empirically investigated by measuring cities’ land-cover changes against their master plans. If a master plan serves as guidance for urban polices that reduce property loss from earthquakes, floods, landslides,land subsidence, and rises in sea level, it will substantially limit urban development in areas at risk from environmental hazards. An environmental risk map weighted toward valuable...

  2. Additional EIPC Study Analysis. Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Hadley, Stanton W [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Gotham, Douglas J. [Purdue Univ., West Lafayette, IN (United States); Luciani, Ralph L. [Navigant Consultant Inc., Suwanee, GA (United States)

    2014-12-01

    Between 2010 and 2012 the Eastern Interconnection Planning Collaborative (EIPC) conducted a major long-term resource and transmission study of the Eastern Interconnection (EI). With guidance from a Stakeholder Steering Committee (SSC) that included representatives from the Eastern Interconnection States Planning Council (EISPC) among others, the project was conducted in two phases. Phase 1 involved a long-term capacity expansion analysis that involved creation of eight major futures plus 72 sensitivities. Three scenarios were selected for more extensive transmission- focused evaluation in Phase 2. Five power flow analyses, nine production cost model runs (including six sensitivities), and three capital cost estimations were developed during this second phase. The results from Phase 1 and 2 provided a wealth of data that could be examined further to address energy-related questions. A list of 14 topics was developed for further analysis. This paper brings together the earlier interim reports of the first 13 topics plus one additional topic into a single final report.

  3. The Strategic Plan and Local Economic Development of Cordoba, Argentina

    NARCIS (Netherlands)

    R. Vanella (Ricardo); C. Lucca (Carlos); J.R. Pittari (Jorge Romero); F. Steinberg (Florian); Zwanenburg Maria Zwanenburg (M.)

    2001-01-01

    textabstractThe Strategic Plan of Cordoba (SPC) is one of the few strategic urban development plans in Latin America, which has actually been implemented in the majority of its components. The SPC was conceived as a collective and global project of the city as a whole without excessive conflicting

  4. System-Cost-Optimized Smart EVSE for Residential Application: Final Technical Report including Manufacturing Plan

    Energy Technology Data Exchange (ETDEWEB)

    Zhu, Charles [Delta Products, Triangle Park, NC (United States)

    2015-05-15

    In the 2nd quarter of 2012, a program was formally initiated at Delta Products to develop smart-grid-enabled Electric Vehicle Supply Equipment (EVSE) product for residential use. The project was funded in part by the U.S. Department of Energy (DOE), under award DE-OE0000590. Delta products was the prime contractor to DOE during the three year duration of the project. In addition to Delta Products, several additional supplier-partners were engaged in this research and development (R&D) program, including Detroit Edison DTE, Mercedes Benz Research and Development North America, and kVA. This report summarizes the program and describes the key research outcomes of the program. A technical history of the project activities is provided, which describes the key steps taken in the research and the findings made at successive stages in the multi-stage work. The evolution of an EVSE prototype system is described in detail, culminating in prototypes shipped to Department of Energy Laboratories for final qualification. After the program history is reviewed, the key attributes of the resulting EVSE are described in terms of functionality, performance, and cost. The results clearly demonstrate the ability of this EVSE to meet or exceed DOE's targets for this program, including: construction of a working product-intent prototype of a smart-grid-enabled EVSE, with suitable connectivity to grid management and home-energy management systems, revenue-grade metering, and related technical functions; and cost reduction of 50% or more compared to typical market priced EVSEs at the time of DOE's funding opportunity announcement (FOA), which was released in mid 2011. In addition to meeting all the program goals, the program was completed within the original budget and timeline established at the time of the award. The summary program budget and timeline, comparing plan versus actual values, is provided for reference, along with several supporting explanatory notes. Technical

  5. Decennial development plan of the GRTgaz's transmission network 2012-2021

    International Nuclear Information System (INIS)

    2012-09-01

    The GRTgaz network is the longest high pressure natural gas transmission network in Europe, and one of the best interconnected. It comprises a main network and a regional network. After an indication of some key figures of the GRTgaz network (duct length, transported volume, exchanged power, clients, turnover, investments), this report proposes a synthetic overview of the decennial development plan framework, of European and French energy policies, of the French geographical position in relationship with Europe, and of the energetic objectives of the decennial plan. In its other parts, this report reviews the gas transmission demand and supply, analyses the evolution of the gas market in Europe and in France (consumption and supplies, issue of secure supply), describes the development of the GRTgaz transmission network (developments in the northern and southern areas, merger of North and South market areas, connection of Corsica), presents the provisional timetable for the planned works (projects put into service within 3 years or after 2014, provisional development of capacities during the 2012-2021 period)

  6. A Study on Planning Strategies for Urban Housing Block Development

    Institute of Scientific and Technical Information of China (English)

    Zeng Wei; Wang Hua; You Juanjuan; Wang Linlin; Li Caige

    2016-01-01

    As a city is the carrier of human society and housing is an important part of a citizen's life and survival,the citizens' choice of their housing mode will influence the material and spiritual life of the individuals,families,and society.In view of the diversification of values and investments,people are eager for a harmonious relationship between the community and the city.As a kind of compact and efficient housing mode,the housing block highlights the organic link of the community within the city in an open and shared living environment.This paper reviews the development of housing blocks in various countries and summarizes the characteristics of housing blocks through a comparison with traditional gated residential quarters and urban blocks.It then analyzes the current difficulties of housing block development in China from aspects such as the planning concept,planning system,management mode,and development mode and accordingly proposes planning principles and strategies in hope of providing theoretical supports for the development and construction of housing blocks in China.

  7. An integration programme of poverty alleviation and development with family planning.

    Science.gov (United States)

    1997-04-01

    The State Council (the central government) recently issued a Circular for Speeding Up the Integration of Poverty Alleviation and Development with the Family Planning Programme during the Ninth Five-year Plan (1996-2000). The Circular was jointly submitted by the State Family Planning Commission and the Leading Group for Poverty Alleviation and Development. The document sets the two major tasks as solving the basic needs for food and clothing of the rural destitute and the control of over-rapid growth of China's population. Practice indicates that a close Integration Programme is the best way for impoverished farmers to alleviate poverty and become better-off. Overpopulation and low educational attainments and poor health quality of population in backward areas are the major factors retarding socioeconomic development. Therefore, it is inevitable to integrate poverty alleviation with family planning. It is a path with Chinese characteristics for a balanced population and sustainable socioeconomic development. The targets of the Integration Programme are as follows: The first is that preferential policies should be worked out to guarantee family planning acceptors, especially households with an only daughter or two daughters, are the first to be helped to eradicate poverty and become well-off. They should become good examples for other rural poor in practicing fewer but healthier births, and generating family income. The second target is that the population plans for the poor counties identified by the central government and provincial governments must be fulfilled. This should contribute to breaking the vicious circle of poverty leading to more children, in turn generating more poverty. The circular demands that more efforts should focus on the training of cadres for the Integrated Programme and on services for poor family planning acceptors. full text

  8. Plan of promotion and development of unconventional renewable sources

    International Nuclear Information System (INIS)

    Rojas M, Jose Rodrigo

    2016-01-01

    The plan for the promotion and development of unconventional sources renewable energies developed by the Instituto Costarricense de Electricidad is explained. The percentage data from the use of unconventional renewable sources for power generation in Costa Rica is presented [es

  9. Energy planning and management plan

    International Nuclear Information System (INIS)

    1996-01-01

    This paper contains printed copies of 60FR 53181, October 12, 1995 and 60 FR 54151. This is a record of decision concerning the Western Area Power Administration's final draft and environmental impact statement, and Energy Planning and Management Program

  10. Puget Sound Tidal Energy In-Water Testing and Development Project Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Collar, Craig W

    2012-11-16

    Tidal energy represents potential for the generation of renewable, emission free, environmentally benign, and cost effective energy from tidal flows. A successful tidal energy demonstration project in Puget Sound, Washington may enable significant commercial development resulting in important benefits for the northwest region and the nation. This project promoted the United States Department of Energy's Wind and Hydropower Technologies Program's goals of advancing the commercial viability, cost-competitiveness, and market acceptance of marine hydrokinetic systems. The objective of the Puget Sound Tidal Energy Demonstration Project is to conduct in-water testing and evaluation of tidal energy technology as a first step toward potential construction of a commercial-scale tidal energy power plant. The specific goal of the project phase covered by this award was to conduct all activities necessary to complete engineering design and obtain construction approvals for a pilot demonstration plant in the Admiralty Inlet region of the Puget Sound. Public Utility District No. 1 of Snohomish County (The District) accomplished the objectives of this award through four tasks: Detailed Admiralty Inlet Site Studies, Plant Design and Construction Planning, Environmental and Regulatory Activities, and Management and Reporting. Pre-Installation studies completed under this award provided invaluable data used for site selection, environmental evaluation and permitting, plant design, and construction planning. However, these data gathering efforts are not only important to the Admiralty Inlet pilot project. Lessons learned, in particular environmental data gathering methods, can be applied to future tidal energy projects in the United States and other parts of the world. The District collaborated extensively with project stakeholders to complete the tasks for this award. This included Federal, State, and local government agencies, tribal governments, environmental groups, and

  11. Implementation of a Web-Based Collaborative Process Planning System

    Science.gov (United States)

    Wang, Huifen; Liu, Tingting; Qiao, Li; Huang, Shuangxi

    Under the networked manufacturing environment, all phases of product manufacturing involving design, process planning, machining and assembling may be accomplished collaboratively by different enterprises, even different manufacturing stages of the same part may be finished collaboratively by different enterprises. Based on the self-developed networked manufacturing platform eCWS(e-Cooperative Work System), a multi-agent-based system framework for collaborative process planning is proposed. In accordance with requirements of collaborative process planning, share resources provided by cooperative enterprises in the course of collaboration are classified into seven classes. Then a reconfigurable and extendable resource object model is built. Decision-making strategy is also studied in this paper. Finally a collaborative process planning system e-CAPP is developed and applied. It provides strong support for distributed designers to collaboratively plan and optimize product process though network.

  12. Changing Perspectives on the Planning of Ankara (1924-2007 and Lessons for a New Master-Planning Approach to Developing Cities

    Directory of Open Access Journals (Sweden)

    Olgu Çalişkan

    2014-07-01

    Full Text Available As one of the newly planned capitals in the 20th century – like Islamabad, Canberra and Brazil –, Ankara represents an original case in planning history: from shaping a new town under the influence of early European urbanism to the control of a dynamic metropolitan form by structural planning approaches. Forming its urban core according to the initial planning perspectives between the beginning of 1930s and the mid-1970s, the city has entered a rapid phase of space production in its extensions for about the last thirty years.In the current period of development, highly fragmented urban peripheral formation has being occurred in Ankara. Since the existing trend on the dispersion of urban form lacking spatial coherence at different scale-levels causes the dominance of the private domain and a loss of urbanity, this trend might at first glance be considered as a break with the European tradition and the emergence of Anglo-Americanization in Turkish planning system in terms of looser development control approach on urban form.Before, coming to such a critical end-point, the paper prefers a closer look into the changing dynamics of master plans of the city. It is aimed to reveal the developmental logic of the city by means of master plan analysis. The comprehensive outlook – called plan matrix – is integrated into each master plan schema by correlating the basic components like main policy directions, depth of control, settlement typology, and city structure and form. Such a framework has a potential to be utilized for any kind of plan analysis at metropolitan scale for different cases. At the end of the analysis, the paper tends to address an alternative master planning approach for the similar types of developing cities striving for keeping its urban character within a fragmented urban body.

  13. Does the Strategic Planning of Local Development Result from the Motives Indicated in Literature? Contemporary Motivation of Polish Small Towns’ Authorities for Strategic Planning of Local Development

    Directory of Open Access Journals (Sweden)

    Andrzej SZTANDO

    2017-06-01

    Full Text Available The international literature offers a numberof motives which should incline local authoritiestoward strategic planning of local development;it also emphasizes that they should be stronglymotivated to do that. Meanwhile, their actualmotivation for such planning can remain low anddominated by motives so far unrecognized in theliterature. The article presents research confi rmingthis assumption, conducted in 2014 amongthe authorities of Polish small towns.The results reveal that the general motivationfor strategic planning of local developmentamong 37.7% of the authorities of Polish smalltowns is low. It also disclosed that the motivefor obtaining means from the EU funds (so farunrecognized in literature was and is motivatingstrongly at least 68.6% of these authorities forthe discussed planning and, moreover, that it is ashort-lived motive. The article indicates that thissituation may also refer to other local authorities,not just the Polish ones. It also indicates that itis an unintended effect of the dependence ofmunicipal development projects’ support by themeans from the EU funds on including them inthe local development strategy. The fi nal part ofthe article presents recommendations of actionsto rectify such an unfavorable situation and forfurther studies of planning motives followed bylocal authorities.

  14. Development of a statewide hospital plan for radiologic emergencies

    International Nuclear Information System (INIS)

    Dainiak, Nicholas; Delli Carpini, Domenico; Bohan, Michael; Werdmann, Michael; Wilds, Edward; Barlow, Agnus; Beck, Charles; Cheng, David; Daly, Nancy; Glazer, Peter; Mas, Peter; Nath, Ravinder; Piontek, Gregory; Price, Kenneth; Albanese, Joseph; Roberts, Kenneth; Salner, Andrew L.; Rockwell, Sara

    2006-01-01

    Although general guidelines have been developed for triage of victims in the field and for hospitals to plan for a radiologic event, specific information for clinicians and administrators is not available for guidance in efficient management of radiation victims during their early encounter in the hospital. A consensus document was developed by staff members of four Connecticut hospitals, two institutions of higher learning, and the State of Connecticut Department of Environmental Protection and Office of Emergency Preparedness, with assistance of the American Society for Therapeutic Radiology and Oncology. The objective was to write a practical manual for clinicians (including radiation oncologists, emergency room physicians, and nursing staff), hospital administrators, radiation safety officers, and other individuals knowledgeable in radiation monitoring that would be useful for evaluation and management of radiation injury. The rationale for and process by which the radiation response plan was developed and implemented in the State of Connecticut are reviewed. Hospital admission pathways are described, based on classification of victims as exposed, contaminated, and/or physically injured. This manual will be of value to those involved in planning the health care response to a radiologic event

  15. Implementing the leadership development plans of faculty education fellows: a structured approach.

    Science.gov (United States)

    Goldman, Ellen F; Wesner, Marilyn; Karnchanomai, Ornpawee; Haywood, Yolanda

    2012-09-01

    The literature about medical education faculty fellowship programs, which have grown in popularity, quantifies program characteristics, provides exemplars, and reports on delivery strategies. Evaluation is generally limited to satisfaction measures, with a few longitudinal studies of postprogram achievements, but none on the process of making these changes.The authors describe the development of faculty members' postfellowship leadership plans and a structured process to support plan implementation. They also compare the implementation of initiatives specified in individual leadership development plans of two cohorts of faculty. The participants were graduates of a fellowship program at the George Washington University School of Medicine and Health Sciences. One cohort participated in a structured process of monthly reciprocal peer coaching, followed by journaling and quarterly interviews with the program director; a second cohort functioned as a comparison with no structured process supporting them. (Study years are not provided because they could inadvertently lead to the identification of the participants.) Despite similar implementation challenges expressed by both cohorts, the cohort participating in the structured process implemented 23% more of their planned initiatives, including 2 times as many educational leadership initiatives and 3.5 times as many initiatives related to developing new curriculum. The combination of plan development, reciprocal peer coaching, journaling, and interview discussions provided faculty with focus, structure, and personal support. This structured process supporting leadership plan development and implementation can be easily transferred to other fellowship programs in medical education, adapted for use with residents and fellows, and used in similar development programs.

  16. SU-F-T-94: Plan2pdf - a Software Tool for Automatic Plan Report for Philips Pinnacle TPS

    Energy Technology Data Exchange (ETDEWEB)

    Wu, C [Sutter Medical Foundation, Roseville, CA (United States)

    2016-06-15

    Purpose: To implement an automatic electronic PDF plan reporting tool for Philips Pinnacle treatment planning system (TPS) Methods: An electronic treatment plan reporting software is developed by us to enable fully automatic PDF report from Pinnacle TPS to external EMR programs such as MOSAIQ. The tool is named “plan2pdf”. plan2pdf is implemented using Pinnacle scripts, Java and UNIX shell scripts, without any external program needed. plan2pdf supports full auto-mode and manual mode reporting. In full auto-mode, with a single mouse click, plan2pdf will generate a detailed Pinnacle plan report in PDF format, which includes customizable cover page, Pinnacle plan summary, orthogonal views through each plan POI and maximum dose point, DRR for each beam, serial transverse views captured throughout the dose grid at a user specified interval, DVH and scorecard windows. The final PDF report is also automatically bookmarked for each section above for convenient plan review. The final PDF report can either be saved on a user specified folder on Pinnacle, or it can be automatically exported to an EMR import folder via a user configured FTP service. In manual capture mode, plan2pdf allows users to capture any Pinnacle plan by full screen, individual window or rectangular ROI drawn on screen. Furthermore, to avoid possible patients’ plan mix-up during auto-mode reporting, a user conflict check feature is included in plan2pdf: it prompts user to wait if another patient is being exported by plan2pdf by another user. Results: plan2pdf is tested extensively and successfully at our institution consists of 5 centers, 15 dosimetrists and 10 physicists, running Pinnacle version 9.10 on Enterprise servers. Conclusion: plan2pdf provides a highly efficient, user friendly and clinical proven platform for all Philips Pinnacle users, to generate a detailed plan report in PDF format for external EMR systems.

  17. SU-F-T-94: Plan2pdf - a Software Tool for Automatic Plan Report for Philips Pinnacle TPS

    International Nuclear Information System (INIS)

    Wu, C

    2016-01-01

    Purpose: To implement an automatic electronic PDF plan reporting tool for Philips Pinnacle treatment planning system (TPS) Methods: An electronic treatment plan reporting software is developed by us to enable fully automatic PDF report from Pinnacle TPS to external EMR programs such as MOSAIQ. The tool is named “plan2pdf”. plan2pdf is implemented using Pinnacle scripts, Java and UNIX shell scripts, without any external program needed. plan2pdf supports full auto-mode and manual mode reporting. In full auto-mode, with a single mouse click, plan2pdf will generate a detailed Pinnacle plan report in PDF format, which includes customizable cover page, Pinnacle plan summary, orthogonal views through each plan POI and maximum dose point, DRR for each beam, serial transverse views captured throughout the dose grid at a user specified interval, DVH and scorecard windows. The final PDF report is also automatically bookmarked for each section above for convenient plan review. The final PDF report can either be saved on a user specified folder on Pinnacle, or it can be automatically exported to an EMR import folder via a user configured FTP service. In manual capture mode, plan2pdf allows users to capture any Pinnacle plan by full screen, individual window or rectangular ROI drawn on screen. Furthermore, to avoid possible patients’ plan mix-up during auto-mode reporting, a user conflict check feature is included in plan2pdf: it prompts user to wait if another patient is being exported by plan2pdf by another user. Results: plan2pdf is tested extensively and successfully at our institution consists of 5 centers, 15 dosimetrists and 10 physicists, running Pinnacle version 9.10 on Enterprise servers. Conclusion: plan2pdf provides a highly efficient, user friendly and clinical proven platform for all Philips Pinnacle users, to generate a detailed plan report in PDF format for external EMR systems.

  18. Final Report for Phase II Study: Prototyping the Sketch Planning Visualization Tool for Non-Motorized Travel

    Energy Technology Data Exchange (ETDEWEB)

    Hwang, Ho-Ling [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Wilson, Daniel W [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Reuscher, Tim [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Chin, Shih-Miao [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Taylor, Rob D [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2014-02-01

    To further examine how factors such as those identified from the Phase I NMT study, and the modeling framework developed under that effort could be applied to local/regional level planning activities, FHWA decided to pursue a Phase II study. It was determined that a small geographic area with more detailed local data would be necessary. Although Washington D.C. was not one of the 2009 NHTS add-ons, it did conduct a household travel survey of 11,000 households in 2007-2008. The National Capital Region Transportation Planning Board at the Metropolitan Washington Council of Governments (MWCOG) conducted the household travel survey. The data coverage under the MWCOG survey is much higher than that of the NHTS. As a part of the Phase II study, a prototype of a Geographic Information System (GIS)-based sketch planning visualization tool was also to be developed. The intent was to use a neighborhood in the Washington D.C. region as a case study for this prototype application.

  19. Development of the Decommissioning Planning System for the WWR-M Reactor

    Energy Technology Data Exchange (ETDEWEB)

    Lobach, Y. [Institute for Nuclear Research, Kiev (Ukraine)

    2013-08-15

    Kiev's research reactor WWR-M is in operation for more than 50 years and its continued operation is planned. At the same time the development of a decommissioning plan is a mandatory requirement of the national legislation and it must be performed at the operational stage of nuclear installation as early as possible. Recently, the Decommissioning Programme for the WWR-M reactor has been developed. The programme covers the whole decommissioning process and represents the main guiding document during the whole decommissioning period, which determines and substantiates the principal technical and organizational activities on the preparation and implementation of the reactor decommissioning, the consequence of the decommissioning stages, the sequence of planned works and measures as well as the necessary conditions and infrastructure for the provision and safe implementation. The programme contains the basic directions of further decommissioning planning aimed on the timely preparation for the reactor decommissioning. This paper describes the status of the WWR-M reactor decommissioning planning attained by the middle of 2011. (author)

  20. The Place of Education in Manpower Planning in Developing Countries

    Science.gov (United States)

    Fapohunda, Olanrewaju J.

    1974-01-01

    Defines manpower planning and outlines its objectives, describes the effects of education on economic growth in developing countries, and discusses problems of education in manpower planning: questions of the source of education, the content, and the percentage of the population ot be educated at a given time. Important political limitations are…

  1. National Hazardous Waste Management Plan. Volume 2. Main report. Export trade information (Final)

    International Nuclear Information System (INIS)

    1989-01-01

    The report is the result of a feasibility study conducted for the Office of the National Environment Board; Ministry of Science, Technology and Energy - Kingdom of Thailand. The overall goal of the study was to work towards implementing a comprehensive National Hazardous Waste Management Plan (NHWMP). The three main objectives of the study were to develop a National Hazardous Wastes Inventory, to develop Stop-Gap Measures for immediate and interim implementation until the NHWMP can be carried out, and to formulate the long range NHWMP with recommendations for its implementation

  2. Vitrification development plan for US Department of Energy mixed wastes

    International Nuclear Information System (INIS)

    Peters, R.; Lucerna, J.; Plodinec, M.J.

    1993-10-01

    This document is a general plan for conducting vitrification development for application to mixed wastes owned by the US Department of Energy. The emphasis is a description and discussion of the data needs to proceed through various stages of development. These stages are (1) screening at a waste site to determine which streams should be vitrified, (2) waste characterization and analysis, (3) waste form development and treatability studies, (4) process engineering development, (5) flowsheet and technical specifications for treatment processes, and (6) integrated pilot-scale demonstration. Appendices provide sample test plans for various stages of the vitrification development process. This plan is directed at thermal treatments which produce waste glass. However, the study is still applicable to the broader realm of thermal treatment since it deals with issues such as off-gas characterization and waste characterization that are not necessarily specific to vitrification. The purpose is to provide those exploring or considering vitrification with information concerning the kinds of data that are needed, the way the data are obtained, and the way the data are used. This will provide guidance to those who need to prioritize data needs to fit schedules and budgets. Knowledge of data needs also permits managers and planners to estimate resource requirements for vitrification development

  3. Busting myths and building resilience: Practices and approaches that go beyond mere plan development.

    Science.gov (United States)

    Armour, Mark

    Dwight D. Eisenhower is often quoted as saying: 'In battle, plans are useless but planning is indispensable'. How many in the business continuity profession actually think about that statement and what it really means? Audit, compliance and regulatory requirements as well as the expectations of executives and business leaders result in an inordinate amount of time and effort devoted to plan development with scant attention paid to actual planning. Practitioners need to realise that the value of the plans they develop is not derived from the finished documents but from the work devoted to completing them. Experience and practice win out above detailed plans. One need look no further than Eisenhower's D-Day invasion of Normandy as evidence. Practitioners need to learn how to be better at instituting preparedness and not simply developing better plans.

  4. Planning and participation

    International Nuclear Information System (INIS)

    Rucht, D.

    1982-01-01

    This study is trying to give a vast survey of the political and administrative system. It is to demonstrate the relations between its secular development trends, the necessity and the limits of political planning under the present conditions and, finally, the increasing demands for participation as expressed especially by citizens' initiatives. These stages, however, are certainly not presented in a smooth manner. Yet the author claims to have kept a certain continuity and inner logic of presentation and argumentation. (orig./DG) [de

  5. Development of retrievability plans

    International Nuclear Information System (INIS)

    Richardson, P.J.

    1999-03-01

    It has become clear, from monitoring of many national programmes for siting of final repositories for radioactive waste disposal, that the potential or otherwise for retrievability of emplaced wastes is the one issue in particular which is repeatedly raised during public consultation and interaction. Although even those repositories which may be constructed over the next decades will operate for many decades more and be sealed only after a long-term monitoring phase, there is little operational pressure to finalise retrievability concepts. However, as siting processes require detailed conceptual designs to be developed, as do the associated safety assessment exercises, it is becoming increasingly recognised that the potential for retrieval must be examined now. This report is the culmination of a short project carried out for the Swedish National Co-ordinator for Nuclear Waste Disposal to examine the situation as regards the development and possible implementation of retrievability as an integral part of a disposal concept for nuclear waste. Because of the short work period involved, it can at best be only an overview, designed to provide a broad picture of current plans. The Swedish Nuclear Power Inspectorate has begun to examine the issue, and a report is due later in 1999. A major collaborative investigation, which began in March 1998, is also currently underway under the auspices of the EU, but only involves implementing agencies from the various Member States. This report is intended to serve as background to these other studies when they appear. Utilising currently available information, as well as personal contacts, those countries currently examining retrievability or reversibility of disposal in some form have been identified. Information regarding these proposals has been collated, and contact made with relevant agencies and national regulatory bodies where possible. The report includes some review of the technical aspects of retrievability, with especial

  6. The Normative and Legal Mechanism for Provision of the Strategic Planning of Regional Development

    Directory of Open Access Journals (Sweden)

    Kuharskaya Natalia O.

    2018-01-01

    Full Text Available The normative and legal provision of the strategic planning of regional development is presented. Features of strategic planning at the regional level in modern conditions are considered. The problems that prevent the use of the system of strategic planning without giving an opportunity both to develop significant plans and to ensure their realization were analyzed. It has been determined that Ukraine as a whole has a normative and legal base for the efficient development of regions, but it requires systematization and harmonization, as some issues are still unresolved. Proposals for further improvement of institutional mechanisms of strategic planning at the regional level are presented, which will improve the quality of development of strategic documents in the process of adoption of managerial decisions. Prospect for further research is the formation of scientifically substantiated proposals to improve the legislation regulating the issues of planning and implementation of strategies for socio-economic development of regions.

  7. HAXWDDD (Hazardous Waste Development, Demonstration, and Disposal) - An exercise in corporate planning

    International Nuclear Information System (INIS)

    McGinnis, C.P.; Pechin, W.H.

    1988-01-01

    The Hazardous Waste Development, Demonstration, and Disposal (HAZWDDD) program is a corporate initiative that is coordinated between Martin Marietta Energy Systems, Inc. (Energy Systems), and the US Department of Energy's Oak Ridge Operations Office (DOE-ORO). The major objective of HAZWDDD is to develop a comprehensive management strategy for the hazardous and mixed wastes generated by the five Energy Systems installations. This program is of prime importance because federal and state regulations for handling hazardous wastes are becoming increasingly stringent and the generator of such wastes retains legally mandated liability for their disposal indefinitely. In addition, no acceptable method is currently available for handling mixed (hazardous and radioactive) wastes. Both Energy Systems corporate management and DOE-ORO management have recognized the seriousness of these problems and have established several programs to determine acceptable courses of action. A plan has been developed for low-level radioactive waste (LLW), and an active dialogue pertaining to LLW is maintained with the state and federal regulators. During 1986, DOE-ORO and Energy Systems identified the need for a plan to address hazardous and mixed wastes. Each installation supports the concept of HAZWDDD through funding and the development of individual HAZWDDD implementation plans. A corporate plan is being developed to integrate the issues discussed in the five installation plans. This paper describes: (1) the approach taken in collecting the necessary information for the plan; (2) some of the techniques used in analyzing the information provided; (3) preliminary data that have been collected in preparation of this plan, (4) the identification of common concerns and issues, and (5) the integration of this information into a corporate approach to mixed and hazardous waste management

  8. Development of Facilities Master Plan and Laboratory Renovation Project

    Energy Technology Data Exchange (ETDEWEB)

    Fox, Andrea D

    2011-10-03

    Funding from this grant has allowed Morehouse School of Medicine to complete its first professionally developed, comprehensive campus master plan that is in alignment with the recently completed strategic plan. In addition to master planning activities, funds were used for programming and designing research renovations, and also to supplement other research facility upgrades by providing lighting and equipment. The activities funded by this grant will provide the catalyst for substantial improvement in the School's overall facilities for biomedical education and research, and will also provide much of the information needed to conduct a successful campaign to raise funds for proposed buildings and renovations.

  9. American Historical Association Faculty Development Program: Planning and Implementation.

    Science.gov (United States)

    Hoffmann, Charles

    The planning and implementation processes of the Long Island Faculty Development Program are described. Originally sponsored by the American Historical Association's Faculty Development Program to improve history instruction, this project includes faculty representatives from four Long Island universities, colleges, and junior colleges. The…

  10. A Model for Physician Leadership Development and Succession Planning.

    Science.gov (United States)

    Dubinsky, Isser; Feerasta, Nadia; Lash, Rick

    2015-01-01

    Although the presence of physicians in formal leadership positions has often been limited to roles of department chiefs, MAC chairs, etc., a growing number of organizations are recruiting physicians to other leadership positions (e.g., VP, CEO) where their involvement is being genuinely sought and valued. While physicians have traditionally risen to leadership positions based on clinical excellence or on a rotational basis, truly effective physician leadership that includes competencies such as strategic planning, budgeting, mentoring, network development, etc., is essential to support organizational goals, improve performance and overall efficiency as well as ensuring the quality of care. In this context, the authors have developed a physician leader development and succession planning matrix and supporting toolkit to assist hospitals in identifying and nurturing the next generation of physician leaders.

  11. The response of the Government of Ontario to the final report of the Royal Commission on Electric Power Planning

    International Nuclear Information System (INIS)

    1981-05-01

    In March 1980, after nearly five years of hearings and research, the Ontario Royal Commission on Electric Power Planning submitted the first volume of its final report. The remaining eight volumes were submitted in April 1980. The Commission made 88 recommendations on technical, operational, and policy issues. The present document sets out the Ontario government's response to the recommendations. The government accepts and is implementing 77 recommendations. Four recommendations require further study, and six have been rejected

  12. Through The Decades - Changes in Social, Economic, Legal and Planning Determinants of Residential Development across Decades - Evidence from Suburban Areas in Poland

    Science.gov (United States)

    Źróbek-Różańska, Alina; Zysk, Elżbieta; Źróbek, Ryszard

    2017-10-01

    Poland has experienced many political, legal, social and economic transformations. For the last twelve decades, this country was under foreign partition, in the war, under the influence of socialist system with centrally planned economy and finally regained autonomy and rapidly introduced market economy. Each epoch had its own characteristic, that can be recognized also in the residential buildings development. Therefore, the authors focused on the social, economic, legal and planning conditionings that shaped the development of the residential buildings with the most characteristic periods: pre-II world war, 50-ties, 60-ties, 70-ties, 80-ties, 90-ties and XXI century. Some of them are visible in the still existing residential buildings, especially in the suburban villages. The most recent process that can be observed in the study area is urban sprawl. Since the beginning of the XXI century, urban population in Poland has been gradually declining, while suburban villages transform into ‘urban-like’ districts. The aim of the study was to arrange and present in the decade-by-decade manner, the social, economic, legal and planning conditionings that were valid in particular periods. It was realized by correlating information on the contemporary social trends, economic conditions, legal framework and planning regulations. Presentation was enriched by the examples of the buildings developed in the accordance with the contemporary restrictions.

  13. Application for Approval : White Rose Canada-Newfoundland Benefits Plan and White Rose Development Plan : Decision 2001.01

    International Nuclear Information System (INIS)

    Stanley, H.H.

    2001-01-01

    The White Rose offshore oil development project is located in the Jeanne d'Arc Basin 350 km east of Newfoundland. It is a co-venture between Husky Oil Operations Ltd. and Petro-Canada. The project is expected to recover 230 million barrels of oil over a 12 year period. This report explains the decision of the Canada-Newfoundland Offshore Petroleum Board regarding the application by Husky Oil and its partner for approval of its plans for the development of the White Rose oil field. The White Rose Development Plan describes the proponent's interpretation of the geology and reservoir characteristics of the oil field and provides estimates of hydrocarbon reserves. The drilling approach that the proponents plan to use at their facilities were also described along with the environmental parameters of the facilities. The Board's responsibility is to ensure that hydrocarbons are produced in accordance with good oil field practice including efficient recovery, prevention of waste and safe operational practices. The White Rose Canada-Newfoundland Benefits Plan addresses issues in the areas that will benefit the province, including: an East Coast Regional Office in St. John's, Newfoundland; employment; research and development; goods and services; disadvantaged individuals and groups; and monitoring and reporting. In terms of protection of the environment, the Board makes its assessment under the guidance of the Canadian Environmental Assessment Act which deals with issues such as the effects of routine releases of greenhouse gas emissions, drilling discharges, production discharges and accidental discharges. It also sets rules for decommissioning and abandonment of floating production, storage and off loading vessels and underwater facilities. The Board considered the application and has decided to approve the Benefits Plan, subject to certain conditions described in this report. tabs., figs., appendices

  14. National negative-ion-based neutral-beam development plan

    International Nuclear Information System (INIS)

    Cooper, W.S.; Pyle, R.V.

    1983-08-01

    The plan covers facilities required, program milestones, and decision points. It includes identification of applications, experiments, theoretical research areas, development of specific technologies and reactor development and demonstration facilities required to bring about the successful application of negative-ion-based neutral beams. Particular emphasis is placed on those activities leading to use on existing plasma confinement experiments or their upgrades

  15. Plutonium Focus Area research and development plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-11-01

    The Department of Energy (DOE) committed to a research and development program to support the technology needs for converting and stabilizing its nuclear materials for safe storage. The R and D Plan addresses five of the six material categories from the 94-1 Implementation Plan: plutonium (Pu) solutions, plutonium metals and oxides, plutonium residues, highly enriched uranium, and special isotopes. R and D efforts related to spent nuclear fuel (SNF) stabilization were specifically excluded from this plan. This updated plan has narrowed the focus to more effectively target specific problem areas by incorporating results form trade studies. Specifically, the trade studies involved salt; ash; sand, slag, and crucible (SS and C); combustibles; and scrub alloy. The plan anticipates possible disposition paths for nuclear materials and identifies resulting research requirements. These requirements may change as disposition paths become more certain. Thus, this plan represents a snapshot of the current progress and will continue to be updated on a regular basis. The paper discusses progress in safeguards and security, plutonium stabilization, special isotopes stabilization, highly-enriched uranium stabilization--MSRE remediation project, storage technologies, engineered systems, core technology, and proposed DOE/Russian technology exchange projects.

  16. Plutonium Focus Area research and development plan. Revision 1

    International Nuclear Information System (INIS)

    1996-11-01

    The Department of Energy (DOE) committed to a research and development program to support the technology needs for converting and stabilizing its nuclear materials for safe storage. The R and D Plan addresses five of the six material categories from the 94-1 Implementation Plan: plutonium (Pu) solutions, plutonium metals and oxides, plutonium residues, highly enriched uranium, and special isotopes. R and D efforts related to spent nuclear fuel (SNF) stabilization were specifically excluded from this plan. This updated plan has narrowed the focus to more effectively target specific problem areas by incorporating results form trade studies. Specifically, the trade studies involved salt; ash; sand, slag, and crucible (SS and C); combustibles; and scrub alloy. The plan anticipates possible disposition paths for nuclear materials and identifies resulting research requirements. These requirements may change as disposition paths become more certain. Thus, this plan represents a snapshot of the current progress and will continue to be updated on a regular basis. The paper discusses progress in safeguards and security, plutonium stabilization, special isotopes stabilization, highly-enriched uranium stabilization--MSRE remediation project, storage technologies, engineered systems, core technology, and proposed DOE/Russian technology exchange projects

  17. Strategic Planning and Doctor Of Nursing Practice Education: Developing Today's and Tomorrow's Leaders.

    Science.gov (United States)

    Falk, Nancy L; Garrison, Kenneth F; Brown, Mary-Michael; Pintz, Christine; Bocchino, Joseph

    2015-01-01

    Strategic planning and thinking skills are essential for today's nurse leaders. Doctor of nursing practice (DNP) programs provide an opportunity for developing effective nurse strategists. A well-designed strategy course can stimulate intellectual growth at all levels of Bloom's Taxonomy. Discussion forums in online education provide new opportunities for rich interaction among peers en route to development of well-informed strategic plans. An interprofessional perspective adds a rich and vital aspect to doctoral nursing education and it serves to inform strategic plan development. A roadmap for teaching strategic planning to current and future nursing leaders will guide the integration of essential content into DNP programs.

  18. Programmable SAW development :Sandia/NASA project final report.

    Energy Technology Data Exchange (ETDEWEB)

    Brocato, Robert Wesley

    2004-10-01

    This report describes a project to develop both fixed and programmable surface acoustic wave (SAW) correlators for use in a low power space communication network. This work was funded by NASA at Sandia National Laboratories for fiscal years 2004, 2003, and the final part of 2002. The role of Sandia was to develop the SAW correlator component, although additional work pertaining to use of the component in a system and system optimization was also done at Sandia. The potential of SAW correlator-based communication systems, the design and fabrication of SAW correlators, and general system utilization of those correlators are discussed here.

  19. Texas geothermal R D and D program planning support document. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Davis, R.J.; Conover, M.F.; Keeney, R.C.; Personett, M.L.; Richmann, D.L.

    1981-08-28

    Program planning support was provided by; developing a geothermal RD and D program structure, characterizing the status of geothermal RD and D through review of literature and interaction with the geothermal research community, developing a candidate list of future Texas geothermal projects, and prioritizing the candidate projects based on appropriate evaluation criteria. The method used to perform this study and the results thereof are presented. Summary reviews of selected completed and ongoing projects and summary descriptions and evaluations of the candidate RD and D projects ar provided. A brief discussion emerging federal RD and D policies is presented. References and independent project rankings by three of the GRP members are included. (MHR)

  20. Planning Development for a Family Planning Centre in Nursing Unit of the General Hospital of Argolida

    OpenAIRE

    Koukoufilippou J; Koinis A.

    2015-01-01

    Introduction: The family planning centres must be upgraded to a cornerstone of primary health care, and prevent, advise and protect the citizen's health while reducing hospitalization costs for hospitals. Aim: The purpose of this literature review is the family planning centre development in general hospital of Argolida that has a similar clinic. Material and Methods: Literature review was conducted of published English and Greek Articles from bibliographic databases Medline, Goog...