  1. Development of an accelerated reliability test schedule for terrestrial solar cells

    Science.gov (United States)

    Lathrop, J. W.; Prince, J. L.

    1981-01-01

    An accelerated test schedule using a minimum amount of tests and a minimum number of cells has been developed on the basis of stress test results obtained from more than 1500 cells of seven different cell types. The proposed tests, which include bias-temperature, bias-temperature-humidity, power cycle, thermal cycle, and thermal shock tests, use as little as 10 and up to 25 cells, depending on the test type.

  2. Case study: Accelerated schedule for MULTI LIMS installation

    International Nuclear Information System (INIS)

    Ibsen, T.G.

    1994-05-01

    This presentation focuses on the steps taken by the Westinghouse Hanford Company to meet an accelerated schedule for configuration and implementation of the MULTI LIMS in a multiple laboratory environment. The Westinghouse Hanford Company purchased the MULTI LIMS Laboratory Information Management System in August, 1993. Hardware delivery began in October, 1993. Less than four months later, the initial configuration was released for use in two Westinghouse Hanford Company laboratories. Several major obstacles were overcome during implementation. These include information gathering for base table loading, user training, acceptance of the new system by users of a legacy system, and hardware configuration issues. In summary, steps needed to be taken to meet the accelerated implementation schedule of the MULTI LIMS at the Hanford Site. The obstacles faced were overcome through the in-depth knowledge and help of the vendor and the dedication and drive of the technical staff

  3. Challenges encountered during an accelerated cogeneration plant construction and commissioning schedule

    International Nuclear Information System (INIS)

    Good, R.L.; Cox, T.P.; Vallejo, J.M.

    1988-01-01

    A decision was made in 1986 to proceed with a 110 magawatt grassroots cogeneration plant to supply the steam and electrical requirements of a large, integrated petrochemical manufacturing facility. Though some preliminary engineering had been done and long delivery equipment purchase orders had been let in the summer of 1986, detailed engineering did not commence until late October and construction until mid-December, 1986. Federal income tax consideration required that the project be in service prior to the end of 1987. This eleven month construction, commissioning, and start up schedule was achieved with 100 per cent operation occurring on December 22, 1987. Numerous challenges were met by the lean Project Team during this accelerated schedule. This paper discusses the development of: Project Team Staffing, Operator and Maintenance Staffing and Training, Commissioning Schedules and Staffing, solutions to Significant Technical Problems

  4. Radiation shielding technology development for proton linear accelerator

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Yong Ouk; Lee, Y. O.; Cho, Y. S. [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of); Kim, M. H.; Sin, M. W.; Park, B. I. [Kyunghee Univ., Seoul (Korea, Republic of)] [and others

    2005-09-01

    This report was presented as an output of 2-year project of the first phase Proton Engineering Frontier Project(PEFP) on 'Radiation Shielding Technology Development for Proton Linear Accelerator' for 20/100 MeV accelerator beam line and facility. It describes a general design concept, provision and update of basic design data, and establishment of computer code system. It also includes results of conceptual and preliminary designs of beam line, beam dump and beam facilities as well as an analysis of air-activation inside the accelerator equipment. This report will guides the detailed shielding design and production of radiation safety analysis report scheduled in the second phase project.

  5. The accelerated hepatitis B virus vaccination schedule among hemodialysis patients, does it work? A randomized controlled trial.

    Science.gov (United States)

    Imam, Mahmoud Hamada

    2017-12-01

    Hemodialysis patients possess particular attributes which increase the susceptibility to hepatitis B virus (HBV) infections. HBV vaccination significantly decreased the number of new HBV-infected patients. However, the conventional vaccination schedule requires a 6-months duration. This study aimed to examine the efficacy the accelerated vaccination schedule among hemodialysis patients. In this study, 202 consecutive hemodialysis patients at New Jeddah hospital were enrolled. The inclusion criteria were: (1) age was above 18 years, (2) all patients had undetectable HBV surface antigen and antibody. Exclusion criteria included: (1) patient had a positive serum HBV surface antigen and antibody using enzyme-linked immunosorbent assay; (2) patient received a previous course of HBV vaccine, (3) patient who was pregnant. Patients were sequentially randomized to receive either Hepatitis B recombinant DNA vaccine (conventional schedule) or to receive combined hepatitis A and B vaccine injection (accelerated schedule). Testing for HBV surface antibodies was done one and three months after completion of the dosage schedule. The primary outcome was the proportion of seroprotection (defined by serum HBV surface antibodies ≥ 10 mIU/ml). Adverse reactions were evaluated regarding both fever and post-injection pain scale. Patients' age ranged from 18 to 71 years.After 1 and 3 months of completion of the vaccination schedule, there was no statistical difference in the proportion of seroprotected patients among both groups. Accelerated vaccination schedule using combined hepatitis A and B vaccine may be beneficial for HBV seroprotection among hemodialysis patients.

  6. Heavy ion accelerator and associated development activities at IUAC

    International Nuclear Information System (INIS)

    Kanjilal, D.

    2011-01-01

    A vertical 15UD Pelletron electrostatic tandem accelerator having highest terminal voltage tested up to 16 MV has been in regular operation at Inter-University Accelerator Center (IUAC) for more than two decades. It has been providing consistently various ion beams in the energy range from a few tens of MeV to 270 MeV for scheduled experiments. A superconducting linear accelerator (LINAC) booster module having eight niobium quarter wave resonators has been designed, fabricated and installed successfully. It is fully operational for scheduled experiments. The LINAC module has been tested and used to accelerate energetic heavy ion beams from 15 UD Pelletron. A new type of high temperature superconducting electron cyclotron resonance ion source (HTS-ECRIS) has been designed, fabricated and installed successfully. It has been in regular operation as future source of highly charged ions having higher beam current for the alternate high current injector (HCI) system for the superconducting LINAC. A radio frequency quadrupole (RFQ) accelerator is being developed to accelerate highly charged particles (A/Q ∼ 6) from HTS-ECRIS to energy of 180 keV/u. The beam will then be accelerated further by drift tube linacs (DTL) to the required velocity for injection of the ion beams in to the existing superconducting LINAC booster. A low energy ion beam facility (LEIBF) having permanent magnet ECRIS on high voltage platform and a 1.7 MV Pelletron are being used for regular experiments. Details of various developmental activities related to the heavy ion accelerator and associated systems at Inter-University Accelerator Centre (IUAC) are presented. (author)

  7. Heavy ion accelerator and associated development activities at IUAC

    International Nuclear Information System (INIS)

    Kanjilal, D.

    2011-01-01

    A vertical 15UD Pelletron electrostatic tandem accelerator having highest terminal voltage tested up to 16 MV has been in regular operation at Inter-University Accelerator Center (IUAC) for more than two decades. It has been providing consistently various ion beams in the energy range from a few tens of MeV to 270MeV for scheduled experiments. A superconducting linear accelerator (LINAC) booster module having eight niobium quarter wave resonators has been designed, fabricated and installed successfully. It is fully operational for scheduled experiments. The LINAC module has been tested and used to accelerate energetic heavy ion beams from 15 UD Pelletron. A new type of high temperature superconducting electron cyclotron resonance ion source (HTS-ECRlS) has been designed, fabricated and installed successfully. lt has been in regular operation as future source of highly charged ions having higher beam current for the alternate high current injector (HCI) system for the superconducting LINAC. A radio frequency quadrupole (RFQ) accelerator is being developed to accelerate highly charged particles (A/Q ∼ 6) from HTS-ECRIS to energy of 180 keV/u. The beam will then be accelerated further by drift tube linacs (DTL) to the required velocity for injection of the ion beams in to the existing superconducting LINAC booster. A low energy ion beam facility (LEIBF) having permanent magnet ECRIS on high voltage platform and a 1.7 MV Pelletron are being used for regular experiments. Details of various developmental activities related to the heavy ion accelerator and associated systems at Inter-University Accelerator Centre (IUAC) are presented. (author)

  8. Accelerator development at Bates

    International Nuclear Information System (INIS)

    Sargent, C.P.

    1983-01-01

    The past year has seen the completion of a major expansion of the Bates Accelerator Laboratory. A second experimental hall, South Hall, and several magnetic spectrometers have been constructed. The accelerator's maximum energy has been raised from 400 to 750 MeV by means of beam recirculation. A current two-year project for the fabrication of an additional RF transmitter plus a 30% increase in RF peak power capability will increase energy further to ca. 1 GeV. During the same period pulse-to-pulse beam sharing between the high-resolution spectrometer area and South Hall will become available. In January 1981 the Laboratory submitted their ''Proposal for a Long-Range Expansion Program'' to DOE-NSF. The proposed development consists of three stages. Stage I calls for the addition of a pulse stretcher ring to furnish a CW beam to the South Hall beam lines. Additional experimental space for internal target experiments and photon tagging research are also included. Stage II increases the accelerator energy to 2.1 GeV (at 140 microamps) by means of a five-pass head-to-tail recirculator. Stage III is, at this time, a plan rather than a proposal. It increases accelerator energy to 4 GeV by extending the accelerator length and power and adds another pulse stretcher ring and three new experimental areas for the higher energy work. This paper discusses each of these stages in detail and recommends their funding and scheduling

  9. Development plan of basic technology for a high intensity proton linear accelerator

    International Nuclear Information System (INIS)

    Mizumoto, M.

    1990-01-01

    The national program called OMEGA (Option Making Extra Gains from Actinide and Fission Products) has started with the aim of promoting the research and development of the new technologies for nuclear waste partitioning and transmutation. As a part of this program, Japan Atomic Energy Research Institute, JAERI, has laid out several R and D plans for accelerator based actinide transmutation. The present article first outlines the status of the high intensity proton linear accelerator. Then it describes the time schedule for the development of a high intensity proton linac, focusing on the first step development (basic technology accelerator), second step development (engineering test accelerator, and third step development (commercial plant). It also outlines the conceptual design study and preliminary design calculations for basic technology accelerator, focusing on general consideration, ion source, radio frequency quadrupole, drift tube linac, and high beta linac. (N.K.)

  10. Accelerating exact schedulability analysis for fixed-priority pre-emptive scheduling

    NARCIS (Netherlands)

    Hang, Y.; Jiale, Z.; Keskin, U.; Bril, R.J.

    2010-01-01

    The schedulability analysis for fixed-priority preemptive scheduling (FPPS) plays a significant role in the real-time systems domain. The so-called Hyperplanes Exact Test (HET) [1] is an example of an exact schedulability test for FPPS. In this paper, we aim at improving the efficiency of HET by

  11. 4 CFR 21.10 - Express options, flexible alternative procedures, accelerated schedules, summary decisions, and...

    Science.gov (United States)

    2010-01-01

    ... alternative procedures to promptly and fairly resolve a protest, including alternative dispute resolution... 4 Accounts 1 2010-01-01 2010-01-01 false Express options, flexible alternative procedures... alternative procedures, accelerated schedules, summary decisions, and status and other conferences. (a) At the...

  12. Accelerated stress testing of thin film solar cells: Development of test methods and preliminary results

    Science.gov (United States)

    Lathrop, J. W.

    1985-01-01

    If thin film cells are to be considered a viable option for terrestrial power generation their reliability attributes will need to be explored and confidence in their stability obtained through accelerated testing. Development of a thin film accelerated test program will be more difficult than was the case for crystalline cells because of the monolithic construction nature of the cells. Specially constructed test samples will need to be fabricated, requiring committment to the concept of accelerated testing by the manufacturers. A new test schedule appropriate to thin film cells will need to be developed which will be different from that used in connection with crystalline cells. Preliminary work has been started to seek thin film schedule variations to two of the simplest tests: unbiased temperature and unbiased temperature humidity. Still to be examined are tests which involve the passage of current during temperature and/or humidity stress, either by biasing in the forward (or reverse) directions or by the application of light during stress. Investigation of these current (voltage) accelerated tests will involve development of methods of reliably contacting the thin conductive films during stress.

  13. Discontinuous Schedule of Bevacizumab in Colorectal Cancer Induces Accelerated Tumor Growth and Phenotypic Changes

    Directory of Open Access Journals (Sweden)

    Selma Becherirat

    2018-04-01

    Full Text Available Antiangiogenics administration in colorectal cancer patients seemed promising therapeutic approach. Inspite of early encouraging results, it however gave only modest clinical benefits. When AAG was administered with discontinuous schedule, the disease showed acceleration in certain cases. Though resistance to AAG has been extensively studied, it is not documented for discontinuous schedules. To simulate clinical situations, we subjected a patient-derived CRC subcutaneous xenograft in mice to three different protocols: 1 AAG (bevacizumab treatment for 30 days (group A (group B was the control, 2 bevacizumab treatment for 50 days (group C and bevacizumab for 30 days and 20 without treatment (group D, and 3 bevacizumab treatment for 70 days (group E and 70 days treatment with a drug-break period between day 30 and 50 (group F. The tumor growth was monitored, and at sacrifice, the vascularity of tumors was measured and the proangiogenic factors quantified. Tumor phenotype was studied by quantifying cancer stem cells. Interrupting bevacizumab during treatment accelerated tumor growth and revascularization. A significant increase of proangiogenic factors was observed when therapy was stopped. On withdrawal of bevacizumab, as also after the drug-break period, the plasmatic VEGF increased significantly. Similarly, a notable increase of CSCs after the withdrawal and drug-break period of bevacizumab was observed (P<.01. The present study indicates that bevacizumab treatment needs to be maintained because discontinuous schedules tend to trigger tumor regrowth, and increase tumor resistance and CSC heterogeneity.

  14. Fernald - Developing and Executing an Accelerated Closure Plan

    International Nuclear Information System (INIS)

    Nixon, D.A.

    2006-01-01

    In November 2000 the Department of Energy (DOE) and Fluor Fernald entered into a closure contract that incited Fluor Fernald to reduce the cost and schedule of the Fernald site cleanup. The contract established a target schedule and target cost and how Fluor Fernald performs against these targets determines the amount of fee the company earns. In response to these new challenges, Fluor Fernald developed a 13-part strategy to safely accelerate work and more efficiently utilize the available funding. Implementation of this strategy required a dramatic culture change at Fernald - from a 'government job mind set' to an entrepreneurial/commercial model. Fluor Fernald's strategy and culture change has proved to be successful as the company is on track to close the site ahead of the target schedule at a total project cost less than the target cost. The elements of Fluor Fernald's strategy and the lessons learned during implementation provide valuable information that could be utilized by other DOE sites that will be undergoing closure over the next decade. (authors)

  15. Accelerator development

    International Nuclear Information System (INIS)

    Anon.

    1975-01-01

    Because the use of accelerated heavy ions would provide many opportunities for new and important studies in nuclear physics and nuclear chemistry, as well as other disciplines, both the Chemistry and Physics Divisions are supporting the development of a heavy-ion accelerator. The design of greatest current interest includes a tandem accelerator with a terminal voltage of approximately 25 MV injecting into a linear accelerator with rf superconducting resonators. This combined accelerator facility would be capable of accelerating ions of masses ranging over the entire periodic table to an energy corresponding to approximately 10 MeV/nucleon. This approach, as compared to other concepts, has the advantages of lower construction costs, lower operating power, 100 percent duty factor, and high beam quality (good energy resolution, good timing resolution, small beam size, and small beam divergence). The included sections describe the concept of the proposed heavy-ion accelerator, and the development program aiming at: (1) investigation of the individual questions concerning the superconducting accelerating resonators; (2) construction and testing of prototype accelerator systems; and (3) search for economical solutions to engineering problems. (U.S.)

  16. An original accelerated radiotherapy schedule in stage III to IV head and neck cancers. Results in a multicenter setting

    International Nuclear Information System (INIS)

    Allal, A.S.

    2000-01-01

    Background: Accelerated radiotherapy delivery has recently been shown to be effective in overcoming repopulation during fractionated radiotherapy. The therapeutic ratio may be particularly favorable for 5-week regimens. This study reports the feasibility and results of a particular accelerated schedule in Stage III to IV head and neck carcinomas used in a multicenter setting. Patients and Methods: Seventy-four patients with Stage III (26 patients) or IV (48 patients) head and neck carcinomas were treated with a 5-week accelerated schedule (69.9 to 69.8 Gy in 41 to 40 fractions over a period of 35 to 36 days). Treatment began with 20 Gy in 10 daily fractions to initial involved sites, followed by bi-fractionated radiotherapy (2x1.6 Gy to 1.66 Gy/day) to a larger head and neck volume. Thirty-six (49%) patients received induction chemotherapy (median 3 cycles, range 1 to 4 cycles). Results: Grade 3 or 4 (RTOG) confluent mucositis was observed in 57 patients (77%) and Grade 3 dysphagia in 33 patients (44%). Grade 3 or 4 (RTOG-EORTC) late complications were scored in 10.5% of cases. The 5-year actuarial locoregional control rate was 56% (95% CI: 42 to 71). The 5-year overall actuarial survival was 32% (95% CI: 18 to 46). Induction chemotherapy was not associated with a more favorable outcome. Conclusions: This study demonstrates the feasibility of this schedule in a multicenter setting. The oncologic results appear similar to those obtained by other accelerated regimens, while the rate of late complications seems acceptable. Five-week accelerated regimens warrant further evaluation, particularly in conjunction with concomitant chemotherapy, in the framework of prospective trials. (orig.) [de

  17. Conception of Self-Construction Production Scheduling System

    Science.gov (United States)

    Xue, Hai; Zhang, Xuerui; Shimizu, Yasuhiro; Fujimura, Shigeru

    With the high speed innovation of information technology, many production scheduling systems have been developed. However, a lot of customization according to individual production environment is required, and then a large investment for development and maintenance is indispensable. Therefore now the direction to construct scheduling systems should be changed. The final objective of this research aims at developing a system which is built by it extracting the scheduling technique automatically through the daily production scheduling work, so that an investment will be reduced. This extraction mechanism should be applied for various production processes for the interoperability. Using the master information extracted by the system, production scheduling operators can be supported to accelerate the production scheduling work easily and accurately without any restriction of scheduling operations. By installing this extraction mechanism, it is easy to introduce scheduling system without a lot of expense for customization. In this paper, at first a model for expressing a scheduling problem is proposed. Then the guideline to extract the scheduling information and use the extracted information is shown and some applied functions are also proposed based on it.

  18. Parametric Cost and Schedule Modeling for Early Technology Development

    Science.gov (United States)

    2018-04-02

    Research NoteNational Security Rep rt PARAMETRIC MODELING FOR EARLY TECHNOLOGY DEVELOPMENT COST AND SCHEDULE Chuck...Alexander NSR_11x17_Cover_CostModeling_v8.indd 1 11/20/17 3:15 PM PARAMETRIC COST AND SCHEDULE MODELING FOR EARLY  TECHNOLOGY DEVELOPMENT Chuck...COST AND SCHEDULE MODELING FOR EARLY  TECHNOLOGY DEVELOPMENT iii Contents Figures

  19. Tandem accelerator operation and improvements

    International Nuclear Information System (INIS)

    Yang Bingfan; Zhang Canzhe; Qin Jiuchang; Hu Yueming; Zhang Guilian; Jiang Yongliang; Hou Deyi; Yang Weimin; Yang Zhiren; Su Shengyong; Kan Chaoxin; Liu Dezhong; Wang Liyong; Bao Yiwen; You Qubo; Yang Tao; Zhang Yan; Zhou Lipeng; Chai Shiqin; Wang Meiyan

    1998-01-01

    The scheduled operation of HI-13 tandem accelerator for various experiments was performed well in 1996 and 1997. The machine running time was 4600 h and 4182 h while the beam time was 3845 h and 3712 h in 1996 and 1997, respectively. The operation of HI-13 tandem accelerator is pretty well. The beam distribution with terminal voltage and the distribution of beam time with ion species are shown out. The development of accelerating tubes for HI-13 tandem is in progress

  20. Developing optimal nurses work schedule using integer programming

    Science.gov (United States)

    Shahidin, Ainon Mardhiyah; Said, Mohd Syazwan Md; Said, Noor Hizwan Mohamad; Sazali, Noor Izatie Amaliena

    2017-08-01

    Time management is the art of arranging, organizing and scheduling one's time for the purpose of generating more effective work and productivity. Scheduling is the process of deciding how to commit resources between varieties of possible tasks. Thus, it is crucial for every organization to have a good work schedule for their staffs. The job of Ward nurses at hospitals runs for 24 hours every day. Therefore, nurses will be working using shift scheduling. This study is aimed to solve the nurse scheduling problem at an emergency ward of a private hospital. A 7-day work schedule for 7 consecutive weeks satisfying all the constraints set by the hospital will be developed using Integer Programming. The work schedule for the nurses obtained gives an optimal solution where all the constraints are being satisfied successfully.

  1. Modelling altered fractionation schedules

    International Nuclear Information System (INIS)

    Fowler, J.F.

    1993-01-01

    The author discusses the conflicting requirements of hyperfractionation and accelerated fractionation used in radiotherapy, and the development of computer modelling to predict how to obtain an optimum of tumour cell kill without exceeding normal-tissue tolerance. The present trend is to shorten hyperfractionated schedules from 6 or 7 weeks to give overall times of 4 or 5 weeks as in new schedules by Herskovic et al (1992) and Harari (1992). Very high doses are given, much higher than can be given when ultrashort schedules such as CHART (12 days) are used. Computer modelling has suggested that optimum overall times, to yield maximum cell kill in tumours ((α/β = 10 Gy) for a constant level of late complications (α/β = 3 Gy) would be X or X-1 weeks, where X is the doubling time of the tumour cells in days (Fowler 1990). For median doubling times of about 5 days, overall times of 4 or 5 weeks should be ideal. (U.K.)

  2. The development of KMRR schedule and progress control system (KSPCS) for the master schedule of KMRR project

    International Nuclear Information System (INIS)

    Choi, Chang Woong; Lee, Tae Joon; Kim, Joon Yun; Cho, Yun Ho; Hah, Jong Hyun

    1993-07-01

    This report was to development the computerized schedule and progress control system for the master schedule of KMRR project with ARTEMIS 7000/386 CM (Ver. 7.4.2.) based on project management theory (PERT/CPM, PDM, and S-curve). This system has been efficiently used for KMRR master schedule and will be utilized for the detail scheduling of KMRR project. (Author) 23 refs., 26 figs., 52 tabs

  3. The development of KMRR schedule and progress control system (KSPCS) for the master schedule of KMRR project

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Chang Woong; Lee, Tae Joon; Kim, Joon Yun; Cho, Yun Ho; Hah, Jong Hyun [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1993-07-01

    This report was to development the computerized schedule and progress control system for the master schedule of KMRR project with ARTEMIS 7000/386 CM (Ver. 7.4.2.) based on project management theory (PERT/CPM, PDM, and S-curve). This system has been efficiently used for KMRR master schedule and will be utilized for the detail scheduling of KMRR project. (Author) 23 refs., 26 figs., 52 tabs.

  4. Development and applications of a multi-purpose digital controller with a System-on-Chip FPGA for accelerators

    Energy Technology Data Exchange (ETDEWEB)

    Kurimoto, Yoshinori, E-mail: kurimoto@post.j-parc.jp [High Energy Accelerator Research Organization (KEK), Ibaraki 319-1195 (Japan); Nakamura, Keigo [Department of Physics, Kyoto University, Kyoto 606-8502 (Japan)

    2016-12-21

    J-PARC Main Ring (MR) is a high intensity proton synchrotron which accelerates protons from 3 GeV to 30 GeV. It has operated at a beam intensity of 390 kW and an upgrade toward the megawatt rating is scheduled. For higher beam intensity, some of the accelerator components require more intelligent and complicated functions. To consolidate such functions among various components, we developed multi-purpose digital boards using a System-on-Chip Field-Programmable Gated Array (SoC FPGA). In this paper, we describe the details of our developed boards as well as their possible applications. As an application of the boards, we have successfully performed the measurement of the betatron amplitude function during beam acceleration in J-PARC MR. The experimental setup and results of the measurement are also described in detail.

  5. Development of the accelerating system

    Energy Technology Data Exchange (ETDEWEB)

    Jang, Jiho; Kwon, H. J.; Kim, D. I.; Kim, H. S.; Ryu, J. Y.; Park, B. S.; Seol, K. T.; Yun, S. P.; Song, Y. G.; Cho, Y. S.

    2013-02-15

    One of the main purposes of the 'Development of the Accelerating System' is developing a 100-MeV proton linac which accelerate proton beams from 20 MeV to 100 MeV by using 7 DTL (drift tube linac) tanks. Two of them were finished in the 2-nd stage of the project. The remaining part was also successfully fabricated and installed at Gyeongju site of KAERI. The MEBT is an essential component to extract and supply 20-MeV proton beams to users, and to match proton beams to the next accelerating structure for 100-MeV acceleration. The development of the MEBT has successfully finished. The project also developed the digital LLRF (low level RF) system which control the accelerating field within 1% in magnitude and 1 degree in phase. This system has been successfully tested in the 20-MeV linac operation at Daejeon site of KAERI. The modified version of the digital LLRF system will be used in the 100-MeV linac operation. The project also developed the beam diagnostic system. They are the strip-line type beam position monitor (BPM), the beam current monitor (CT), the beam loss monitor (BLM), and the emittance measurement system. They are used to measure the characteristics of the 20-MeV proton beams. The project also developed the EPIC-based control system. It is used to monitor the status of the accelerator and components, and to remotely control accelerator components. It has been used and modified in the 20-MeV linac operation. The modified version of the LLRF, diagnostics and control systems will be used in 100-MeV linac operation.

  6. Decommissioning Programme Management: reducing risk and cost while accelerating schedules through improved planning, Earned Value Management and safe work execution

    International Nuclear Information System (INIS)

    Hansen, S.E.

    2008-01-01

    CH2M HILL experience includes more than two decades of managing nuclear facilities and providing clean-up and operations support for commercial and government facilities worldwide. Our expertise ranges from decommissioning and defence sector businesses to nuclear technology development and innovation. Our approach places top priority on the safe execution of work while reducing both risk and cost. Our nuclear services include: programme management, nuclear safety analysis, radiological protection, radioactive waste management, nuclear remediation, nuclear materials and waste transportation management, nuclear safeguards and security services, and nuclear decontamination and decommissioning. This paper will discuss our approach which has resulted in a strong track record of accelerating schedules and reducing costs of major nuclear programmes, including Rocky Flats, Idaho, and our work at UKAEA sites. (author)

  7. Status and schedule of J-PARC 50 GeV synchrotron

    International Nuclear Information System (INIS)

    Oogoe, Takao; Yoshioka, Masakazu; Kobayashi, Hitoshi; Takeuchi, Yasunori; Shirakata, Masashi; Shirakabe, Yoshihisa; Kuniyasu, Yuu; Oki, Hiroshi; Takiyama, Youichi

    2005-01-01

    Japan Proton Accelerator Research Complex (J-PARC) is the research complex based on three high intensity proton Accelerators: a linac, a 3 GeV synchrotron (RCS), and a 50 GeV synchrotron (MR). The construction of the MR started in 2002, and its beam commissioning is scheduled in January of 2008. The accelerator tunnel of the J-PARC 50 GeV Synchrotron is still under construction, and will be completed at the end of 2006. Installation of accelerator-components is scheduled to start in July 2005 in parallel with civil and utility construction. This document describes how to install accelerator components in the tunnel and civil engineering of the tunnel. (author)

  8. Heavy-ion fusion accelerator research, 1988

    International Nuclear Information System (INIS)

    1989-05-01

    This report discusses the following topics: MBE-4: The Induction-Linac Approach; Current Amplification and Acceleration Schedules; Emittance and Current Amplification; Scaling Up the Results; Progress on the Carbon-Arc Source; Injector Development; Progress Towards an ILSE Design; Beam Combination; and Focusing-System Alignment Tolerances

  9. High intensity proton accelerator program

    International Nuclear Information System (INIS)

    Kaneko, Yoshihiko; Mizumoto, Motoharu; Nishida, Takahiko

    1991-06-01

    Industrial applications of proton accelerators to the incineration of the long-lived nuclides contained in the spent fuels have long been investigated. Department of Reactor Engineering of Japan Atomic Energy Research Institute (JAERI) has formulated the Accelerator Program through the investigations on the required performances of the accelerator and its development strategies and also the research plan using the accelerator. Outline of the Program is described in the present report. The target of the Program is the construction of the Engineering Test Accelerators (ETA) of the type of a linear accelerator with the energy 1.5 GeV and the proton current ∼10 mA. It is decided that the construction of the Basic Technology Accelerator (BTA) is necessary as an intermediate step, aiming at obtaining the required technical basis and human resources. The Basic Technology Accelerator with the energy of 10 MeV and with the current of ∼10 mA is composed of the ion source, RFQ and DTL, of which system forms the mock-up of the injector of ETA. Development of the high-β structure which constitutes the main acceleration part of ETA is also scheduled. This report covers the basic parameters of the Basic Technology Accelerator (BTA), development steps of the element and system technologies of the high current accelerators and rough sketch of ETA which can be prospected at present. (J.P.N.)

  10. Accelerated stress testing of terrestrial solar cells

    Science.gov (United States)

    Lathrop, J. W.; Hawkins, D. C.; Prince, J. L.; Walker, H. A.

    1982-01-01

    The development of an accelerated test schedule for terrestrial solar cells is described. This schedule, based on anticipated failure modes deduced from a consideration of IC failure mechanisms, involves bias-temperature testing, humidity testing (including both 85-85 and pressure cooker stress), and thermal-cycle thermal-shock testing. Results are described for 12 different unencapsulated cell types. Both gradual electrical degradation and sudden catastrophic mechanical change were observed. These effects can be used to discriminate between cell types and technologies relative to their reliability attributes. Consideration is given to identifying laboratory failure modes which might lead to severe degradation in the field through second quadrant operation. Test results indicate that the ability of most cell types to withstand accelerated stress testing depends more on the manufacturer's design, processing, and worksmanship than on the particular metallization system. Preliminary tests comparing accelerated test results on encapsulated and unencapsulated cells are described.

  11. Technical assessment of the Loma Linda University proton therapy accelerator

    International Nuclear Information System (INIS)

    1989-10-01

    In April 1986, officials of Loma Linda University requested that Fermilab design and construct a 250 MeV proton synchrotron for radiotherapy, to be located at the Loma Linda University Medical Center. In June 1986 the project, having received all necessary approvals, commenced. In order to meet a desirable schedule providing for operation in early 1990, it was decided to erect such parts of the accelerator as were complete at Fermilab and conduct a precommissioning activity prior to the completion of the building at Loma Linda which will house the final radiotherapy facility. It was hoped that approximately one year would be saved by the precommissioning, and that important information would be obtained about the system so that improvements could be made during installation at Loma Linda. This report contains an analysis by Fermilab staff members of the information gained in the precommissioning activity and makes recommendations about steps to be taken to enhance the performance of the proton synchrotron at Loma Linda. In the design of the accelerator, effort was made to employ commercially available components, or to industrialize the products developed so that later versions of the accelerator could be produced industrially. The magnets could only be fabricated at Fermilab if the schedule was to be met, but efforts were made to transfer that technology to industry. Originally, it was planned to use a 1.7 MeV RFQ fabricated at the Lawrence Berkeley Laboratory as injector, but LBL would have found it difficult to meet the project schedule. After consideration of other options, for example a 3.4 MeV tandem accelerator, a supplier (AccSys Inc.) qualified itself to provide a 2 MeV RFQ on a schedule well matched to the project schedule. This choice was made, but a separate supplier was selected to develop and provide the 425 MHz power amplifier for the RFQ

  12. Rabies vaccinations: are abbreviated intradermal schedules the future?

    NARCIS (Netherlands)

    Wieten, R. W.; Leenstra, T.; van Thiel, P. P. A. M.; van Vugt, M.; Stijnis, C.; Goorhuis, A.; Grobusch, M. P.

    2013-01-01

    Rabies is a deadly disease, and current preexposure vaccination schedules are lengthy and expensive. We identified nine studies investigating abbreviated schedules. Although initial responses were lower, accelerated adequate immune responses were elicited after booster vaccinations. Lower-dose (and

  13. Accelerated product development

    NARCIS (Netherlands)

    Langerak, F.; Seth, J.N.; Malhotra, N.K.

    2011-01-01

    Accelerated product development is a competitive strategy that seeks to reduce the development cycle time of new products. However, there has been little theoretical advancement and empirical model testing in the identification of the conditions under which cycle time reduction is appropriate, the

  14. Baseline development, economic risk, and schedule risk: An integrated approach

    International Nuclear Information System (INIS)

    Tonkinson, J.A.

    1994-01-01

    The economic and schedule risks of Environmental Restoration (ER) projects are commonly analyzed toward the end of the baseline development process. Risk analysis is usually performed as the final element of the scheduling or estimating processes for the purpose of establishing cost and schedule contingency. However, there is an opportunity for earlier assessment of risks, during development of the technical scope and Work Breakdown Structure (WBS). Integrating the processes of risk management and baselining provides for early incorporation of feedback regarding schedule and cost risk into the proposed scope of work. Much of the information necessary to perform risk analysis becomes available during development of the technical baseline, as the scope of work and WBS are being defined. The analysis of risk can actually be initiated early on during development of the technical baseline and continue throughout development of the complete project baseline. Indeed, best business practices suggest that information crucial to the success of a project be analyzed and incorporated into project planning as soon as it is available and usable

  15. Large electrostatic accelerators

    International Nuclear Information System (INIS)

    Jones, C.M.

    1984-01-01

    The paper is divided into four parts: a discussion of the motivation for the construction of large electrostatic accelerators, a description and discussion of several large electrostatic accelerators which have been recently completed or are under construction, a description of several recent innovations which may be expected to improve the performance of large electrostatic accelerators in the future, and a description of an innovative new large electrostatic accelerator whose construction is scheduled to begin next year

  16. Accelerated subcutaneous immunotherapy in pediatric population – Systematic review

    Directory of Open Access Journals (Sweden)

    R.A. Gomes dos Reis Pimentel

    2018-05-01

    Full Text Available Background: Accelerated subcutaneous immunotherapy (SCIT schedules represent an alternative to conventional SCIT, providing immunotherapy benefits in a shorter period of time. The objectives of this systematic review were to assess clinical and immunological efficacy as well as safety of accelerated SCIT build-up schedules for the treatment of respiratory allergy in pediatric patients. Methods: Studies were located by searching PubMed, using “immunotherapy” and “desensitization” as keywords. The selection of studies, published from January 1st, 2006, to December 31th, 2015, was performed in two stages: screening of titles and abstracts, and assessment of the full papers identified as relevant, considering the inclusion criteria. Data were extracted in a standardized way and synthesized qualitatively to assess efficacy and safety of accelerated schedules in respiratory allergy. Results: Eleven trials were included: two evaluated rush SCIT and nine assessed cluster SCIT. This review demonstrated that rush and cluster schedules are clinically and immunological efficacious, with faster effect than conventional schedules. No relevant difference with respect to clinical outcomes was noticed between subgroups (pediatric, adult and mixed populations. Regarding safety, most local adverse reactions were mild and there were neither life-threatening systemic reactions nor fatal events. No relevant differences in the incidence and severity of either local or systemic reactions between the accelerated schedule group and control group were registered. Conclusions: Accelerated SCIT build-up schedules are effective in the treatment of respiratory allergy in pediatric patients, representing a safe alternative to the conventional schedules with the advantage of achieving clinical effectiveness sooner. Keywords: Allergy, Immunotherapy, Pediatrics

  17. Acceleration, current amplification and emittance in MBE-4, an experimental beam induction linear accelerator for heavy ions

    International Nuclear Information System (INIS)

    Warwick, A.I.; Gough, D.E.; Keefe, D.; Meuth, H.

    1988-10-01

    We report on the implementation of a second schedule of acceleration and current amplification in MBE-4. Control of the beam current within the bunch is improved over that in the first schedule by the addition of several small amplitude induction pulsers to compensate for acceleration errors and to control the ends of the bunch. Measurements of the longitudinal and transverse emittance are presented. 5 refs., 3 figs., 1 tab

  18. Implementation of a hepatitis A/B vaccination program using an accelerated schedule among high-risk inmates, Los Angeles County Jail, 2007-2010.

    Science.gov (United States)

    Costumbrado, John; Stirland, Ali; Cox, Garrett; El-Amin, Alvin Nelson; Miranda, Armidia; Carter, Ann; Malek, Mark

    2012-11-06

    The Centers for Disease Control and Prevention recommend vaccination for men who have sex with men (MSM) and injection drug users against hepatitis A and B. This study is the first report of a hepatitis vaccination program in a United States jail with a combined vaccine using an accelerated schedule. Los Angeles County has the largest jail system in the nation and Men's Central Jail (MCJ) is the largest facility within that system. MCJ includes a unit for self-identified MSM, where approximately 2700 inmates are housed per year. Starting in August 2007, a combined hepatitis A and B vaccine was offered to all inmates housed in this special unit. Using an accelerated schedule (0-, 7-, 21-30 days, 12-month booster), a total of 3931 doses were administered to 1633 inmates as of June 2010. Of those, 77% received 2 doses, 58% received 3 doses, and 11% received the booster dose. Inmates who screened positive for a sexually transmitted infection in this unit were 1.3 times more likely to be vaccinated (95% CI 1.2-1.4) compared to others in the same housing unit who screened negative. Hepatitis vaccination initiatives can be successfully implemented in an urban jail among an extremely high-risk population using the accelerated, combined hepatitis A/B vaccine. Ours may be a useful model for other programs to vaccinate incarcerated populations. Copyright © 2012 Elsevier Ltd. All rights reserved.

  19. Development of Flow Accelerated Corrosion Reduction Technology

    Energy Technology Data Exchange (ETDEWEB)

    Heo, Min Bum; Choi, Won Yeol; Lee, Jong Chan; Lim, Dong Seok; Kwon, Byung Il; Ku, Hee Kwon; Kim, Jong Uk [FNC Tech, Yongin (Korea, Republic of)

    2015-10-15

    Development of flow accelerated corrosion reduction technology is necessary for prevent this kind of accidents. This study deals with development of flow accelerated corrosion reduction technology through platinum injection and developed of flow accelerated corrosion reduction technology by imitating water chemical condition in PWR secondary system in practice. In addition, in order to get reliability of water chemical simulator in PWR secondary system, analyzed and compared with test result through CFD analysis. This study composed test device that can simulate water chemical environment in PWR secondary system, in order to develop flow accelerated corrosion reduction , and evaluated the ratio of corrosion in water chemical environment in PWR secondary system. In conclusion, corrosion ratio of low alloy steel material that includes more Cr and Mo was lower. And the results were confirmed to be the maximum corrosion rate in the case that replicate the 90 elbow. Additionally, inserted Pt nano particle for developing flow accelerated corrosion rate reduction technology, the test results, it was confirmed for about 80% of the flow accelerated corrosion rate reduction than before input.

  20. Accelerator development for heavy ion fusion

    International Nuclear Information System (INIS)

    Talbert, W.L. Jr.; Sawyer, G.A.

    1980-01-01

    Accelerator technology development is presented for heavy ion drivers used in inertial confinement fusion. The program includes construction of low-velocity ''test bed'' accelerator facilities, development of analytical and experimental techniques to characterize ion beam behavior, and the study of ion beam energy deposition

  1. Accelerator Operators and Software Development

    International Nuclear Information System (INIS)

    April Miller; Michele Joyce

    2001-01-01

    At Thomas Jefferson National Accelerator Facility, accelerator operators perform tasks in their areas of specialization in addition to their machine operations duties. One crucial area in which operators contribute is software development. Operators with programming skills are uniquely qualified to develop certain controls applications because of their expertise in the day-to-day operation of the accelerator. Jefferson Lab is one of the few laboratories that utilizes the skills and knowledge of operators to create software that enhances machine operations. Through the programs written; by operators, Jefferson Lab has improved machine efficiency and beam availability. Because many of these applications involve automation of procedures and need graphical user interfaces, the scripting language Tcl and the Tk toolkit have been adopted. In addition to automation, some operator-developed applications are used for information distribution. For this purpose, several standard web development tools such as perl, VBScript, and ASP are used. Examples of applications written by operators include injector steering, spin angle changes, system status reports, magnet cycling routines, and quantum efficiency measurements. This paper summarizes how the unique knowledge of accelerator operators has contributed to the success of the Jefferson Lab control system. *This work was supported by the U.S. DOE contract No. DE-AC05-84-ER40150

  2. Acceleration, current amplification and emittance in MBE-4, an experimental multiple beam induction linear accelerator for heavy ions

    International Nuclear Information System (INIS)

    Warwick, A.I.; Gough, D.E.; Keefe, D.; Meuth, H.

    1989-01-01

    The authors report on the implementation of a second schedule of acceleration and current amplification in MBE-4. Control of the beam current within the bunch is improved over that in the first schedule by the addition of several small amplitude induction pulsers to compensate for acceleration errors and to control the ends of the bunch. Measurements of the longitudinal and transverse emittance are presented. 5 refs., 3 figs., 1 tab

  3. Physics and technical development of accelerators

    International Nuclear Information System (INIS)

    2000-03-01

    About 90 registered participants delivered more than 40 scientific papers. A great part of these presentations were of general interest about running projects such as CIME accelerator at Ganil, IPHI (high intensity proton injector), ESRF (European source of synchrotron radiation), LHC (large hadron collider), ELYSE accelerator at Orsay, AIRIX, and VIVITRON tandem accelerator. Other presentations highlighted the latest technological developments of accelerator components: superconducting cavities, power klystrons, high current injectors..

  4. Development of Power System for Medium Energy Accelerator

    International Nuclear Information System (INIS)

    Kwon, Hyeok Jung; Kim, Dae Il; Kim, Han Sung; Seol, Kyung Tae; Jang, Ji Ho; Cho, Yong Sub; Hong, In Seok; Kim, Kyung Ryul

    2008-05-01

    The main goal of the studies are to develop a power supply system used for 100MeV proton accelerator and to operate 20MeV accelerator which has been installed in KAERI site. The 100MeV proton accelerator uses RF cavity to accelerate beams and need RF amplifier, klystron. To operate the klystron, a high power pulse power supply is required and the power supply system should have high quality because the reliability of the power supply has critical impact on the overall reliability of accelerator system. Therefore, high power pulse power system and related technology development are inevitable for 100MeV accelerator system development. 20MeV accelerator system has been developed and installed in KAERI site, which will be used as an injector for 100MeV accelerator and supply 20MeV beam to users. A study on the 20MeV accelerator characteristics should be performed to operate the machine efficiently. In addition, this machine can be used as a test bench for developing the 100MeV accelerator components. Therefore, not only the hardware so called 'high voltage power supply', but the related technology of the high quality high voltage power system and man power can be obtained from the results of this studies. The test results of the 20MeV accelerator can be utilized as a basis for efficient operation of 100MeV accelerator and these are the ultimate objective and necessities of the study

  5. Resource-constrained project scheduling problem: review of past and recent developments

    Directory of Open Access Journals (Sweden)

    Farhad Habibi

    2018-01-01

    Full Text Available The project scheduling problem is both practically and theoretically of paramount importance. From the practical perspective, improvement of project scheduling as a critical part of project management process can lead to successful project completion and significantly decrease of the relevant costs. From the theoretical perspective, project scheduling is regarded as one of the in-teresting optimization issues, which has attracted the attention of many researchers in the area of operations research. Therefore, the project scheduling issue has been significantly evaluated over time and has been developed from various aspects. In this research, the topics related to Re-source-Constrained Project Scheduling Problem (RCPSP are reviewed, recent developments in this field are evaluated, and the results are presented for future studies. In this regard, first, the standard problem of RCPSP is expressed and related developments are presented from four as-pects of resources, characteristics of activities, type of objective functions, and availability level of information. Following that, details about 216 articles conducted on RCPSP during 1980-2017 are expressed. At the end, in line with the statistics obtained from the evaluation of previ-ous articles, suggestions are made for the future studies in order to help the development of new issues in this area.

  6. Development of Watch Schedule Using Rules Approach

    Science.gov (United States)

    Jurkevicius, Darius; Vasilecas, Olegas

    The software for schedule creation and optimization solves a difficult, important and practical problem. The proposed solution is an online employee portal where administrator users can create and manage watch schedules and employee requests. Each employee can login with his/her own account and see his/her assignments, manage requests, etc. Employees set as administrators can perform the employee scheduling online, manage requests, etc. This scheduling software allows users not only to see the initial and optimized watch schedule in a simple and understandable form, but also to create special rules and criteria and input their business. The system using rules automatically will generate watch schedule.

  7. Scheduling at the Los Alamos Neutron Science Center (LANSCE)

    International Nuclear Information System (INIS)

    Gallegos, F.R.

    1999-01-01

    The centerpieces of the Los Alamos Neutron Science Center (LANSCE) are a half-mile long 800-MeV proton linear accelerator and proton storage ring. The accelerator, storage ring, and target stations provide the protons and spallation neutrons that are used in the numerous basic research and applications experimental programs supported by the US Department of Energy. Experimental users, facility maintenance personnel, and operations personnel must work together to achieve the most program benefit within defined budget and resource constraints. In order to satisfy the experimental users programs, operations must provide reliable and high quality beam delivery. Effective and efficient scheduling is a critical component to achieve this goal. This paper will detail how operations scheduling is presently executed at the LANSCE accelerator facility

  8. Development of bipolar pulse accelerator for intense pulsed ion beam acceleration

    International Nuclear Information System (INIS)

    Fujioka, Y.; Mitsui, C.; Kitamura, I.; Takahashi, T.; Masugata, K.; Tanoue, H.; Arai, K.

    2003-01-01

    To improve the purity of an intense pulsed ion beams a new type of pulsed ion beam accelerator named 'bipolar pulse accelerator (BPA)' was proposed. In the accelerator purity of the beam is expected. To confirm the principle of the accelerator experimental system was developed. The system utilizes B y type magnetically insulated acceleration gap and operated with single polar negative pulse. A coaxial gas puff plasma gun placed in the grounded anode was used as an ion source, and source plasma (nitrogen) of current density approx. = 25 A/cm 2 , duration approx. = 1.5 μs was injected into the acceleration gap. The ions are successfully accelerated from the grounded anode to the drift tube by applying negative pulse of voltage 180 kV, duration 60 ns to the drift tube. Pulsed ion beam of current density approx. = 40 A/cm 2 , duration approx. 60 ns was obtained at 42 mm downstream from the anode surface. (author)

  9. Advanced accelerator research and development

    International Nuclear Information System (INIS)

    Anon.

    1974-01-01

    Research and development on the Positron-Electron Project (PEP), the electron rings, the superconducting accelerator (ESCAR), and the superconductivity program are reported. Efforts relating to the proposed PEP include work on: (1) the injection system; (2) the rf system; (3) the main-ring bend magnets; (4) the magnet power supplies and controls; (5) alignment; (6) radiation and shielding; (7) the vacuum system; and (8) conventional facilities (utilities, etc.). Experimental and theoretical work continued on the development of suitably intense electron rings as vehicles for the collective acceleration of ions. The most difficult problem was found to be the longitudinal (negative mass) instability. Design work was begun for ESCAR (Experimental Superconducting Accelerating Ring), a small proton synchrotron and storage ring using superconducting magnets, which should aid in the design of future large superconducting facilities. Magnet development was largely directed toward the detailed design of the dipole units. A superconducting beam transport line was installed at the Bevatron. (PMA)

  10. Constraint-based job shop scheduling with ILOG SCHEDULER

    NARCIS (Netherlands)

    Nuijten, W.P.M.; Le Pape, C.

    1998-01-01

    We introduce constraint-based scheduling and discuss its main principles. An approximation algorithm based on tree search is developed for the job shop scheduling problem using ILOG SCHEDULER. A new way of calculating lower bounds on the makespan of the job shop scheduling problem is presented and

  11. Inverse free-electron laser accelerator development

    International Nuclear Information System (INIS)

    Fisher, A.; Gallardo, J.; Steenbergen, A. van; Sandweiss, J.; Fang, J.M.

    1994-06-01

    The study of the Inverse Free-Electron Laser, as a potential mode of electron acceleration, has been pursued at Brookhaven National Laboratory for a number of years. More recent studies focused on the development of a low energy (few GeV), high gradient, multistage linear accelerator. The authors are presently designing a short accelerator module which will make use of the 50 MeV linac beam and high power (2 x 10 11 W) CO 2 laser beam of the Accelerator Test Facility (ATF) at the Center for Accelerator Physics (CAP), Brookhaven National Laboratory. These elements will be used in conjunction with a fast excitation (300 μsec pulse duration) variable period wiggler, to carry out an accelerator demonstration stage experiment

  12. Early Mucosal Reactions During and After Head-and-Neck Radiotherapy: Dependence of Treatment Tolerance on Radiation Dose and Schedule Duration

    International Nuclear Information System (INIS)

    Fenwick, John D.; Lawrence, Geoff P.; Malik, Zafar; Nahum, Alan E.; Mayles, W. Philip M.

    2008-01-01

    Purpose: To more precisely localize the dose-time boundary between head-and-neck radiotherapy schedules inducing tolerable and intolerable early mucosal reactions. Methods and Materials: Total cell-kill biologically effective doses (BED CK ) have been calculated for 84 schedules, including incomplete repair effects, but making no other corrections for the effect of schedule duration T. [BED CK ,T] scatterplots are graphed, overlying BED CKboundary (T) curves on the plots and using discriminant analysis to optimize BED CKboundary (T) to best represent the boundary between the tolerable and intolerable schedules. Results: More overlap than expected is seen between the tolerable and intolerable treatments in the 84-schedule [BED CK ,T] scatterplot, but this was largely eliminated by removing gap and tolerated accelerating schedules from the plot. For the remaining 57 predominantly regular schedules, the BED CKboundary (T) boundary increases with increasing T (p = 0.0001), curving upwards significantly nonlinearly (p = 0.00007) and continuing to curve beyond 15 days (p = 0.035). The regular schedule BED CKboundary (T) boundary does not describe tolerability well for accelerating schedules (p = 0.002), with several tolerated accelerating schedules lying above the boundary where regular schedules would be intolerable. Gap schedule tolerability also is not adequately described by the regular schedule boundary (p = 0.04), although no systematic offset exists between the regular boundary and the overall gap schedule tolerability pattern. Conclusions: All schedules analyzed (regular, gap, and accelerating) with BED CK values below BED CKboundary (T)=69.5x(T/32.2)/sin((T/32.2) (radians) )-3.5Gy 10 (forT≤50 days) are tolerable, and many lying above the boundary are intolerable. The accelerating schedules analyzed were tolerated better overall than are the regular schedules with similar [BED CK ,T] values.

  13. Information Flow Scheduling in Concurrent Multi-Product Development Based on DSM

    Science.gov (United States)

    Sun, Qing-Chao; Huang, Wei-Qiang; Jiang, Ying-Jie; Sun, Wei

    2017-09-01

    Multi-product collaborative development is adopted widely in manufacturing enterprise, while the present multi-project planning models don't take technical/data interactions of multiple products into account. To decrease the influence of technical/data interactions on project progresses, the information flow scheduling models based on the extended DSM is presented. Firstly, information dependencies are divided into four types: series, parallel, coupling and similar. Secondly, different types of dependencies are expressed as DSM units, and the extended DSM model is brought forward, described as a block matrix. Furthermore, the information flow scheduling methods is proposed, which involves four types of operations, where partitioning and clustering algorithm are modified from DSM for ensuring progress of high-priority project, merging and converting is the specific computation of the extended DSM. Finally, the information flow scheduling of two machine tools development is analyzed with example, and different project priorities correspond to different task sequences and total coordination cost. The proposed methodology provides a detailed instruction for information flow scheduling in multi-product development, with specially concerning technical/data interactions.

  14. An original accelerated radiotherapy schedule in stage III to IV head and neck cancers. Results in a multicenter setting

    Energy Technology Data Exchange (ETDEWEB)

    Allal, A.S. [Geneva Univ. Hospital (Switzerland). Div. of Radiation Oncology; Monney, M.; Rosset, A.; Ozsahin, M. [Hopital Cantonal Universitaire, Lausanne (Switzerland). Inst. de Radiographie; Guillemin, C. [Cantonal Radiotherapy Department Sion (Switzerland)

    2000-01-01

    Background: Accelerated radiotherapy delivery has recently been shown to be effective in overcoming repopulation during fractionated radiotherapy. The therapeutic ratio may be particularly favorable for 5-week regimens. This study reports the feasibility and results of a particular accelerated schedule in Stage III to IV head and neck carcinomas used in a multicenter setting. Patients and Methods: Seventy-four patients with Stage III (26 patients) or IV (48 patients) head and neck carcinomas were treated with a 5-week accelerated schedule (69.9 to 69.8 Gy in 41 to 40 fractions over a period of 35 to 36 days). Treatment began with 20 Gy in 10 daily fractions to initial involved sites, followed by bi-fractionated radiotherapy (2x1.6 Gy to 1.66 Gy/day) to a larger head and neck volume. Thirty-six (49%) patients received induction chemotherapy (median 3 cycles, range 1 to 4 cycles). Results: Grade 3 or 4 (RTOG) confluent mucositis was observed in 57 patients (77%) and Grade 3 dysphagia in 33 patients (44%). Grade 3 or 4 (RTOG-EORTC) late complications were scored in 10.5% of cases. The 5-year actuarial locoregional control rate was 56% (95% CI: 42 to 71). The 5-year overall actuarial survival was 32% (95% CI: 18 to 46). Induction chemotherapy was not associated with a more favorable outcome. Conclusions: This study demonstrates the feasibility of this schedule in a multicenter setting. The oncologic results appear similar to those obtained by other accelerated regimens, while the rate of late complications seems acceptable. Five-week accelerated regimens warrant further evaluation, particularly in conjunction with concomitant chemotherapy, in the framework of prospective trials. (orig.) [German] Hintergrund: Die Wirksamkeit der akzelerierten Bestrahlung in bezug auf die Bewaeltigung der Tumorzellrepopulation waehrend einer Radiotherapie ist vor kurzem nachgewiesen worden. Das Verhaeltnis zwischen therapeutischem Effekt und Toxizitaet duerfte fuer fuenfwoechige Schemen

  15. DEVELOPMENT OF A MAINTENANCE SCHEDULING MODEL FOR ...

    African Journals Online (AJOL)

    ... of minor maintenance, for each machine within this time span. In order to minimize the total cost of repairs and production. A numerical application of this development model in a case study is presented. Key words: Maintenance, modeling, scheduling, optimization. [Global Jnl Engineering Res. Vol.1(2) 2002: 107-118] ...

  16. UCLA accelerator research ampersand development. Progress report

    International Nuclear Information System (INIS)

    1997-01-01

    This report discusses work on advanced accelerators and beam dynamics at ANL, BNL, SLAC, UCLA and Pulse Sciences Incorporated. Discussed in this report are the following concepts: Wakefield acceleration studies; plasma lens research; high gradient rf cavities and beam dynamics studies at the Brookhaven accelerator test facility; rf pulse compression development; and buncher systems for high gradient accelerator and relativistic klystron applications

  17. Radiation safety training for accelerator facilities

    International Nuclear Information System (INIS)

    Trinoskey, P.A.

    1997-02-01

    In November 1992, a working group was formed within the U.S. Department of Energy's (DOE's) accelerator facilities to develop a generic safety training program to meet the basic requirements for individuals working in accelerator facilities. This training, by necessity, includes sections for inserting facility-specific information. The resulting course materials were issued by DOE as a handbook under its technical standards in 1996. Because experimenters may be at a facility for only a short time and often at odd times during the day, the working group felt that computer-based training would be useful. To that end, Lawrence Livermore National Laboratory (LLNL) and Argonne National Laboratory (ANL) together have developed a computer-based safety training program for accelerator facilities. This interactive course not only enables trainees to receive facility- specific information, but time the training to their schedule and tailor it to their level of expertise

  18. ADVANCED SCHEDULER FOR COOPERATIVE EXECUTION OF THREADS ON MULTI-CORE SYSTEM

    Directory of Open Access Journals (Sweden)

    O. N. Karasik

    2017-01-01

    Full Text Available Three architectures of the cooperative thread scheduler in a multithreaded application that is executed on a multi-core system are considered. Architecture A0 is based on the synchronization and scheduling facilities, which are provided by the operating system. Architecture A1 introduces a new synchronization primitive and a single queue of the blocked threads in the scheduler, which reduces the interaction activity between the threads and operating system, and significantly speed up the processes of blocking and unblocking the threads. Architecture A2 replaces the single queue of blocked threads with dedicated queues, one for each of the synchronizing primitives, extends the number of internal states of the primitive, reduces the inter- dependence of the scheduling threads, and further significantly speeds up the processes of blocking and unblocking the threads. All scheduler architectures are implemented on Windows operating systems and based on the User Mode Scheduling. Important experimental results are obtained for multithreaded applications that implement two blocked parallel algorithms of solving the linear algebraic equation systems by the Gaussian elimination. The algorithms differ in the way of the data distribution among threads and by the thread synchronization models. The number of threads varied from 32 to 7936. Architecture A1 shows the acceleration of up to 8.65% and the architecture A2 shows the acceleration of up to 11.98% compared to A0 architecture for the blocked parallel algorithms computing the triangular form and performing the back substitution. On the back substitution stage of the algorithms, architecture A1 gives the acceleration of up to 125%, and architecture A2 gives the acceleration of up to 413% compared to architecture A0. The experiments clearly show that the proposed architectures, A1 and A2 outperform A0 depending on the number of thread blocking and unblocking operations, which happen during the execution of

  19. Development and evaluation of a scheduling algorithm for parallel hardware tests at CERN

    CERN Document Server

    Galetzka, Michael

    This thesis aims at describing the problem of scheduling, evaluating different scheduling algorithms and comparing them with each other as well as with the current prototype solution. The implementation of the final solution will be delineated, as will the design considerations that led to it. The CERN Large Hadron Collider (LHC) has to deal with unprecedented stored energy, both in its particle beams and its superconducting magnet circuits. This energy could result in major equipment damage and downtime if it is not properly extracted from the machine. Before commissioning the machine with the particle beam, several thousands of tests have to be executed, analyzed and tracked to assess the proper functioning of the equipment and protection systems. These tests access the accelerator's equipment in order to verify the correct behavior of all systems, such as magnets, power converters and interlock controllers. A test could, for example, ramp the magnet to a certain energy level and then provoke an emergency...

  20. Induction accelerator development for heavy ion fusion

    International Nuclear Information System (INIS)

    Reginato, L.L.

    1993-05-01

    For approximately a decade, the Heavy Ion Fusion Accelerator Research (HIFAR) group at LBL has been exploring the use of induction accelerators with multiple beams as the driver for inertial fusion targets. Scaled experiments have investigated the transport of space charge dominated beams (SBTE), and the current amplification and transverse emittance control in induction linacs (MBE-4) with very encouraging results. In order to study many of the beam manipulations required by a driver and to further develop economically competitive technology, a proposal has been made in partnership with LLNL to build a 10 MeV accelerator and to conduct a series of experiments collectively called the Induction Linac System Experiments (ILSE). The major components critical to the ILSE accelerator are currently under development. We have constructed a full scale induction module and we have tested a number of amorphous magnetic materials developed by Allied Signal to establish an overall optimal design. The electric and magnetic quadrupoles critical to the transport and focusing of heavy ion beams are also under development The hardware is intended to be economically competitive for a driver without sacrificing any of the physics or performance requirements. This paper will concentrate on the recent developments and tests of the major components required by the ILSE accelerator

  1. Induction accelerator development for heavy ion fusion

    International Nuclear Information System (INIS)

    Reginato, L.L.

    1993-05-01

    For approximately a decade, the Heavy Ion Fusion Accelerator Research (HIFAR) group at LBL has been exploring the use of induction accelerators with multiple beams as the driver for inertial fusion targets. Scaled experiments have investigated the transport of space charge dominated beams (SBTE), and the current amplification and transverse emittance control in induction linacs (MBE-4) with very encouraging results. In order to study many of the beam manipulations required by a driver and to further develop economically competitive technology, a proposal has been made in partnership with LLNL to build a 10 MeV accelerator and to conduct a series of experiments collectively called the Induction Linac System Experiments (ILSE).The major components critical to the ILSE accelerator are currently under development. We have constructed a full scale induction module and we have tested a number of amorphous magnetic materials developed by Allied Signal to establish an overall optimal design. The electric and magnetic quadrupoles critical to the transport and focusing of heavy ion beams are also under development. The hardware is intended to be economically competitive for a driver without sacrificing any of the physics or performance requirements. This paper will concentrate on the recent developments and tests of the major components required by the ILSE accelerator

  2. A three-stage heuristic for harvest scheduling with access road network development

    Science.gov (United States)

    Mark M. Clark; Russell D. Meller; Timothy P. McDonald

    2000-01-01

    In this article we present a new model for the scheduling of forest harvesting with spatial and temporal constraints. Our approach is unique in that we incorporate access road network development into the harvest scheduling selection process. Due to the difficulty of solving the problem optimally, we develop a heuristic that consists of a solution construction stage...

  3. Ultra-high gradient compact accelerator developments

    NARCIS (Netherlands)

    Brussaard, G.J.H.; Wiel, van der M.J.

    2004-01-01

    Continued development of relatively compact, although not quite 'table-top', lasers with peak powers in the range up to 100 TW has enabled laser-plasma-based acceleration experiments with amazing gradients of up to 1 TV/m. In order to usefully apply such gradients to 'controlled' acceleration,

  4. Accelerator-breeder, an application of high-energy accelerators to solving our energy problems

    International Nuclear Information System (INIS)

    Grand, P.; Batchelor, K.; Powell, J.R.; Steinberg, M.

    1977-01-01

    The rising costs of 235 U and other fossil fuels, and the schedule for implementing the breeder reactor have renewed interest in the utilization of accelerators for breeding 233 U or 239 Pu. A discussion is given of some of the basic accelerator parameters and choices to be made in order to meet the technical and economic requirements of such a facility

  5. Heavy-ion fusion accelerator research, 1985

    International Nuclear Information System (INIS)

    1986-10-01

    A plan for exploring the physics and technology of induction linac development is discussed which involves a series of increasingly sophisticated experiments. The first is the single-beam transport experiment, which has explored the physics of a single space-charge-dominated beam. Second is the multiple-beam experiment in which four independent beams will be transported and accelerated through a multigap accelerating structure. The single-beam transport experiment is described, and some results are given of stability studies and instrumentation studies. The design and fabrication of the multi-beam experiment are described, as well as results of a first round of experiments in which beam-current amplification was observed. Concurrent theoretical work, resulting in a variety of acce-leration schedules and sets of associated voltage waveforms required to implement the experiments, is also reported

  6. HILBILAC development for accelerator-driven transmutation

    Energy Technology Data Exchange (ETDEWEB)

    Pirozhenko, V.; Plink, O. [Moscow Radiotechnical Institute (Russian Federation)

    1995-10-01

    High-Intensity Low-Beta Ion Linac (HILBILAC) is intended for acceleration of ion beams with current of about 1 A and higher. The CW HILBILAC with beam current of 2l50 mA is under development at MRTI. Concept of parameters choice is presented along with results of beam dynamics and resonator parameters calculations. A pulse prototype HILBILAC-TEST will have to be constructed and tested for the CW accelerator development, its scheme and parameters are presented.

  7. Technologies using accelerator-driven targets under development at BNL

    International Nuclear Information System (INIS)

    Van Tuyle, G.J.

    1994-01-01

    Recent development work conducted at Brookhaven National Laboratory on technologies which use particle accelerator-driven targets is summarized. These efforts include development of the Spallation-Induced Lithium Conversion (SILC) Target for the Accelerator Production of Tritium (APT), the Accelerator-Driven Assembly for Plutonium Transformation (ADAPT) Target for the Accelerator-Based Conversion (ABC) of excess weapons plutonium. The PHOENIX Concept for the accelerator-driven transmutation of minor actinides and fission products from the waste stream of commercial nuclear power plants, and other potential applications

  8. [Technical Gap of Chinese Medical Accelerator and Its Development Path].

    Science.gov (United States)

    Tian, Xinzhi

    2017-11-30

    With the reform and opening up the tide through nearly four decades of development, our medical accelerator business isfacing new era demands now, in this new historical opportunity in front of the younger generation of medical accelerator staff must assume the older generation of scientific research personnel are different of the historical responsibility. Based on the development of the predecessors, we try to analyze the current situation of the domestic accelerator, establish the new development ideas of the domestic medical accelerator, and directly face and solve the dilemma facing the development of the domestic accelerator.

  9. Development of high intensity proton accelerator

    International Nuclear Information System (INIS)

    Mizumoto, M.; Kusano, J.; Hasegawa, K.; Ouchi, N.; Oguri, H.; Kinsho, M.; Touchi, Y.; Honda, Y.; Mukugi, K.; Ino, H.; Noda, F.; Akaoka, N.; Kaneko, H.; Chishiro, E.; Fechner, B.

    1997-01-01

    The high-intensity proton linear accelerator with an energy of 1.5 GeV and an average current of 5.33mA has been proposed for the Neutron Science Project (NSP) at JAERI. the NSP is aiming at exploring nuclear technologies for nuclear waste transmutation based on a proton induced spallation neutrons. The proposed accelerators facilities will be also used in the various basic research fields such as condensed matter physics in combination with a high intensity proton storage ring. The R and D work has been carried out for the components of the front-end of the proton accelerator. For the high energy portion above 100 MeV, superconducting (SC) accelerator linac has been designed and developed as a major option. (Author) 7 refs

  10. An Accelerator Control Middle Layer Using MATLAB

    International Nuclear Information System (INIS)

    Portmann, Gregory J.; Corbett, Jeff; Terebilo, Andrei

    2005-01-01

    Matlab is an interpretive programming language originally developed for convenient use with the LINPACK and EISPACK libraries. Matlab is appealing for accelerator physics because it is matrix-oriented, provides an active workspace for system variables, powerful graphics capabilities, built-in math libraries, and platform independence. A number of accelerator software toolboxes have been written in Matlab -- the Accelerator Toolbox (AT) for model-based machine simulations, LOCO for on-line model calibration, and Matlab Channel Access (MCA) to connect with EPICS. The function of the MATLAB ''MiddleLayer'' is to provide a scripting language for machine simulations and on-line control, including non-EPICS based control systems. The MiddleLayer has simplified and streamlined development of high-level applications including configuration control, energy ramp, orbit correction, photon beam steering, ID compensation, beam-based alignment, tune correction and response matrix measurement. The database-driven Middle Layer software is largely machine-independent and easy to port. Six accelerators presently use the software package with more scheduled to come on line soon

  11. Development of bipolar-pulse accelerator for intense pulsed ion beam acceleration

    Energy Technology Data Exchange (ETDEWEB)

    Masugata, Katsumi [Department of Electrical and Electronic System Engineering, Toyama University, 3190 Gofuku, Toyama 930-8555 (Japan)]. E-mail: masugata@eng.toyama-u.ac.jp; Shimizu, Yuichro [Department of Electrical and Electronic System Engineering, Toyama University, 3190 Gofuku, Toyama 930-8555 (Japan); Fujioka, Yuhki [Department of Electrical and Electronic System Engineering, Toyama University, 3190 Gofuku, Toyama 930-8555 (Japan); Kitamura, Iwao [Department of Electrical and Electronic System Engineering, Toyama University, 3190 Gofuku, Toyama 930-8555 (Japan); Tanoue, Hisao [National Institute of Advanced Industry Science and Technology, 1-1-1, Umezono, Tsukuba-shi, Ibaraki 305-8568 (Japan); Arai, Kazuo [National Institute of Advanced Industry Science and Technology, 1-1-1, Umezono, Tsukuba-shi, Ibaraki 305-8568 (Japan)

    2004-12-21

    To improve the purity of intense pulsed ion beams, a new type of pulsed ion beam accelerator named 'bipolar pulse accelerator' was proposed. To confirm the principle of the accelerator a prototype of the experimental system was developed. The system utilizes By type magnetically insulated acceleration gap and operated with single polar negative pulse. A coaxial gas puff plasma gun was used as an ion source, which was placed inside the grounded anode. Source plasma (nitrogen) of current density {approx}25A/cm2, duration {approx}1.5{mu}s was injected into the acceleration gap by the plasma gun. The ions were successfully accelerated from the grounded anode to the drift tube by applying negative pulse of voltage 240kV, duration 100ns to the drift tube. Pulsed ion beam of current density {approx}40A/cm2, duration {approx}50ns was obtained at 41mm downstream from the anode surface. To evaluate the irradiation effect of the ion beam to solid material, an amorphous silicon thin film of thickness {approx}500nm was used as the target, which was deposited on the glass substrate. The film was found to be poly-crystallized after 4-shots of the pulsed nitrogen ion beam irradiation.

  12. A survey of the practice and management of radiotherapy linear accelerator quality control in the UK.

    Science.gov (United States)

    Palmer, A; Kearton, J; Hayman, O

    2012-11-01

    The objective of this study was to determine current radiotherapy linear accelerator quality control (QC) practice in the UK, as a comparative benchmark and indicator of development needs, and to raise awareness of QC as a key performance indicator. All UK radiotherapy centres were invited to complete an online questionnaire regarding their local QC processes, and submit their QC schedules. The range of QC tests, frequency of measurements and acceptable tolerances in use across the UK were analysed, and consensus and range statistics determined. 72% of the UK's 62 radiotherapy centres completed the questionnaire and 40% provided their QC schedules. 60 separate QC tests were identified from the returned schedules. There was a large variation in the total time devoted to QC between centres: interquartile range from 13 to 26 h per linear accelerator per month. There has been a move from weekly to monthly testing of output calibration in the last decade, with reliance on daily constancy testing equipment. 33% of centres thought their schedules were in need of an update and only 30% used risk-assessment approaches to determine local QC schedule content. Less than 30% of centres regularly complete all planned QC tests each month, although 96% achieve over 80% of tests. A comprehensive "snapshot" of linear accelerator QC testing practice in the UK has been collated, which demonstrates reasonable agreement between centres in their stated QC test frequencies. However, intelligent design of QC schedules and management is necessary to ensure efficiency and appropriateness.

  13. The RF system for the Accelerator Production of Tritium (APT) Low Energy Demonstration Accelerator (LEDA) at Los Alamos

    International Nuclear Information System (INIS)

    Lynch, M.T.; Rees, D.; Tallerico, P.; Regan, A.

    1996-01-01

    To develop and demonstrate the crucial front end of the APT accelerator and some of the critical components for APT, Los Alamos is building a CW proton accelerator (LEDA) to provide 100 mA at up to 40 MeV. LEDA will be installed where the SDI-sponsored Ground Test Accelerator was located. The first accelerating structure for LEDA is a 7-MeV RFQ operating at 350 MHz, followed by several stages of a coupled-cavity Drift Tube Linac (CCDTL) operating at 700 MHz. The first stage of LEDA will go to 12 MeV. Higher energies, up to 40 MeV, come later in the program. Three 1.2-MW CW RF systems will be used to power the RFQ. This paper describes the RF systems being assembled for LEDA, including the 350 and 700-MHz klystrons, the High Voltage Power Supplies, transmitters, RF transport, window/coupler assemblies, and controls. Some of the limitations imposed by the schedule and the building itself are addressed

  14. Development of an international schedule for the assessment and staging of care for dementia

    NARCIS (Netherlands)

    Semrau, M.; Burns, A.; Djukic-Dejanovic, S.; Eraslan, D.; Han, C.; Lecic-Tosevski, D.; Lobo, A.; Mihai, A.; Morris, J.; Palumbo, C.; Robert, P.; Stiens, G.; Stoppe, G.; Volpe, U.; Olde Rikkert, M.G.M.; Sartorius, N.

    2015-01-01

    BACKGROUND: A reliable and valid global staging scale has been lacking within dementia care. OBJECTIVE: To develop an easy-to-use multi-dimensional clinical staging schedule for dementia. METHODS: The schedule was developed through: i) Two series of focus groups (40 and 48 participants,

  15. The Continuous Electron Beam Accelerator Facility

    International Nuclear Information System (INIS)

    Grunder, H.A.; Bisognano, J.J.; Diamond, W.I.; Hartline, B.K.; Leemann, C.W.; Mougey, J.; Sundelin, R.M.; York, R.C.

    1987-01-01

    On February 13, 1987, construction started on the Continuous Electron Beam Accelerator Facility - a 4-GeV, 200-μA, continuous beam, electron accelerator facility designed for nuclear physics research. The machine has a racetrack configuration with two antiparallel, 500-MeV, superconducting linac segments connected by beam lines to allow four passes of recirculation. The accelerating structure consists of 1500-MHz, five-cell niobium cavities developed at Cornell University. A liquid helium cryogenic system cools the cavities to an operating temperature of 2 K. Beam extraction after any three of the four passes allows simultaneous delivery of up to three beams of independently variable currents and different, but correlated, energies to the three experimental areas. Beam breakup thresholds exceed the design current by nearly two orders of magnitude. Project completion and the start of physics operations are scheduled for 1993. The total estimated cost is $255 million

  16. Large electrostatic accelerators

    Energy Technology Data Exchange (ETDEWEB)

    Jones, C.M.

    1984-01-01

    The increasing importance of energetic heavy ion beams in the study of atomic physics, nuclear physics, and materials science has partially or wholly motivated the construction of a new generation of large electrostatic accelerators designed to operate at terminal potentials of 20 MV or above. In this paper, the author briefly discusses the status of these new accelerators and also discusses several recent technological advances which may be expected to further improve their performance. The paper is divided into four parts: (1) a discussion of the motivation for the construction of large electrostatic accelerators, (2) a description and discussion of several large electrostatic accelerators which have been recently completed or are under construction, (3) a description of several recent innovations which may be expected to improve the performance of large electrostatic accelerators in the future, and (4) a description of an innovative new large electrostatic accelerator whose construction is scheduled to begin next year. Due to time and space constraints, discussion is restricted to consideration of only tandem accelerators.

  17. Large electrostatic accelerators

    International Nuclear Information System (INIS)

    Jones, C.M.

    1984-01-01

    The increasing importance of energetic heavy ion beams in the study of atomic physics, nuclear physics, and materials science has partially or wholly motivated the construction of a new generation of large electrostatic accelerators designed to operate at terminal potentials of 20 MV or above. In this paper, the author briefly discusses the status of these new accelerators and also discusses several recent technological advances which may be expected to further improve their performance. The paper is divided into four parts: (1) a discussion of the motivation for the construction of large electrostatic accelerators, (2) a description and discussion of several large electrostatic accelerators which have been recently completed or are under construction, (3) a description of several recent innovations which may be expected to improve the performance of large electrostatic accelerators in the future, and (4) a description of an innovative new large electrostatic accelerator whose construction is scheduled to begin next year. Due to time and space constraints, discussion is restricted to consideration of only tandem accelerators

  18. Accelerator Technology Program. Status report, January-September 1983

    International Nuclear Information System (INIS)

    Jameson, R.A.

    1984-07-01

    This report presents highlights of major projects in the Accelerator Technology Division of the Los Alamos National Laboratory. The first section deals with the Fusion Materials Irradiation Test Facility's 2-MeV accelerator on which tests began in May, as scheduled. Then, activities are reported on beam dynamics, inertial fusion, structure development, the racetrack microtron, the CERN high-energy physics experiment NA-12, and LAMPF II. The Proton Storage Ring is discussed next, with emphasis on the computer control system, diagnostics interfacing, and theoretical support. Other sections summarize progress on a portable radiographic linac, developments on the klystron code, and on permanent magnets. Activities of the Theory and Simulation Group are outlined next, followed by discussion of the oscillator experiment and the energy-recovery experiment in the free electron laser project. The last section reports on the accelerator test stand. An unusual and very satisfying activity for the Division was the hosting of the 1983 Particle Accelerator Conference in Santa Fe, March 21-23, 1983. The conference had the largest attendance ever, with 895 registrants, 61 invited papers, and 521 contributed papers

  19. Development of preventive maintenance procedures and schedules

    International Nuclear Information System (INIS)

    Schlenker, H.V.; Hammel, J.

    1977-01-01

    An outline of the procedures and schedules developed for preventive maintenance in power stations within the Rheinisch-Westfaelisches Elektrizitaetswerk (RWE) is presented. After an introduction of maintenance in general the different kinds of preventive maintenance activities are described. This includes also the prerequisite identification systems. The aims of preventive maintenance and the measures are explained that have to be taken, if these aims are to be achieved. A number of examples from actual practice are cited. (orig.) [de

  20. Day-ahead resource scheduling of a renewable energy based virtual power plant

    International Nuclear Information System (INIS)

    Zamani, Ali Ghahgharaee; Zakariazadeh, Alireza; Jadid, Shahram

    2016-01-01

    Highlights: • Simultaneous energy and reserve scheduling of a VPP. • Aggregate uncertainties of electricity prices, renewable generation and load demand. • Develop a stochastic scheduling model using the point estimate method. - Abstract: The evolution of energy markets is accelerating in the direction of a greater reliance upon distributed energy resources (DERs). To manage this increasing two-way complexity, virtual power plants (VPPs) are being deployed today all over the world. In this paper, a probabilistic model for optimal day ahead scheduling of electrical and thermal energy resources in a VPP is proposed where participation of energy storage systems and demand response programs (DRPs) are also taken into account. In the proposed model, energy and reserve is simultaneously scheduled considering the uncertainties of market prices, electrical demand and intermittent renewable power generation. The Point Estimate Method (PEM) is applied in order to model the uncertainties of VPP’s scheduling problem. Moreover, the optimal reserve scheduling of VPP is presented which efficiently decreases VPP’s risk facing the unexpected fluctuations of uncertain parameters at the power delivery time. The results demonstrated that implementation of demand response programs (DRPs) would decrease total operation costs of VPP as well as its dependency on the upstream network.

  1. A Reconfigured Whale Optimization Technique (RWOT for Renewable Electrical Energy Optimal Scheduling Impact on Sustainable Development Applied to Damietta Seaport, Egypt

    Directory of Open Access Journals (Sweden)

    Noha H. El-Amary

    2018-03-01

    both scenarios, are developed. Also, the boundary conditions and problem constraints are concluded. The RWOT algorithm is an updated Whale Optimization Algorithm (WOA. It is developed to accelerate the rate of reaching the optimal solution for the IS problem. The two strategies simulation and implementation are illustrated and applied to the seaport of Damietta, which is an Egyptian port, located 10 km to the west of the Nile River (Damietta Branch. The scheduling of PV and biomass energy generation during the different year months is examined for both strategies. The impact of renewable electrical energies generation scheduling on carbon dioxide emission and consequently global warming is discussed. The saving in carbon dioxide emission is calculated and the efficient results of the suggested models are clarified. The carbon dioxide emission is reduced to around its fifth value, during renewable energy operation. This work focuses on decreasing the rate of growth of carbon dioxide emission coming from fossil fuel electrical power generation in Egypt, targeting, sustainable green seaports, through three main contributions in clean renewable electrical energies scheduling,. The contributions are; 1-presenting the eco-availability mode for minimum gifted biomass and PV energy generation, 2-developing and progressing the IRWOT scheduling strategy for both scenarios (with and without storage unit, 3-defining the scheduling optimization problem boundary conditions and constraints.

  2. Advanced Accelerator Development Strategy Report: DOE Advanced Accelerator Concepts Research Roadmap Workshop

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2016-02-03

    Over a full two day period, February 2–3, 2016, the Office of High Energy Physics convened a workshop in Gaithersburg, MD to seek community input on development of an Advanced Accelerator Concepts (AAC) research roadmap. The workshop was in response to a recommendation by the HEPAP Accelerator R&D Subpanel [1] [2] to “convene the university and laboratory proponents of advanced acceleration concepts to develop R&D roadmaps with a series of milestones and common down selection criteria towards the goal for constructing a multi-TeV e+e– collider” (the charge to the workshop can be found in Appendix A). During the workshop, proponents of laser-driven plasma wakefield acceleration (LWFA), particle-beam-driven plasma wakefield acceleration (PWFA), and dielectric wakefield acceleration (DWFA), along with a limited number of invited university and laboratory experts, presented and critically discussed individual concept roadmaps. The roadmap workshop was preceded by several preparatory workshops. The first day of the workshop featured presentation of three initial individual roadmaps with ample time for discussion. The individual roadmaps covered a time period extending until roughly 2040, with the end date assumed to be roughly appropriate for initial operation of a multi-TeV e+e– collider. The second day of the workshop comprised talks on synergies between the roadmaps and with global efforts, potential early applications, diagnostics needs, simulation needs, and beam issues and challenges related to a collider. During the last half of the day the roadmaps were revisited but with emphasis on the next five to ten years (as specifically requested in the charge) and on common challenges. The workshop concluded with critical and unanimous endorsement of the individual roadmaps and an extended discussion on the characteristics of the common challenges. (For the agenda and list of participants see Appendix B.)

  3. Web Publishing Schedule

    Science.gov (United States)

    Section 207(f)(2) of the E-Gov Act requires federal agencies to develop an inventory and establish a schedule of information to be published on their Web sites, make those schedules available for public comment. To post the schedules on the web site.

  4. Ground test accelerator control system software

    International Nuclear Information System (INIS)

    Burczyk, L.; Dalesio, R.; Dingler, R.; Hill, J.; Howell, J.A.; Kerstiens, D.; King, R.; Kozubal, A.; Little, C.; Martz, V.; Rothrock, R.; Sutton, J.

    1988-01-01

    This paper reports on the GTA control system that provides an environment in which the automation of a state-of-the-art accelerator can be developed. It makes use of commercially available computers, workstations, computer networks, industrial 110 equipment, and software. This system has built-in supervisory control (like most accelerator control systems), tools to support continuous control (like the process control industry), and sequential control for automatic start-up and fault recovery (like few other accelerator control systems). Several software tools support these levels of control: a real-time operating system (VxWorks) with a real-time kernel (VRTX), a configuration database, a sequencer, and a graphics editor. VxWorks supports multitasking, fast context-switching, and preemptive scheduling. VxWorks/VRTX is a network-based development environment specifically designed to work in partnership with the UNIX operating system. A data base provides the interface to the accelerator components. It consists of a run time library and a database configuration and editing tool. A sequencer initiates and controls the operation of all sequence programs (expressed as state programs). A graphics editor gives the user the ability to create color graphic displays showing the state of the machine in either text or graphics form

  5. Accelerator research on MBE-4, an experimental multi-beam induction linac

    International Nuclear Information System (INIS)

    Meuth, H.; Fessenden, T.J.; Keefe, D.; Warwick, A.I.

    1988-06-01

    The multiple beam accelerator MBE-4 is a device for research toward a heavy ion driver for inertial confinement fusion, based on the induction linac concept. Its main goal is proof of the principle of current amplification by acceleration and controlled self-similar beam pulse compression. Into the 16-m long device four beams, each with an initial current of 10 mA are injected from a Marx-driven diode at 200 keV. The current amplification is up to nine-fold, with a final beam energy of about 800 keV in the middle of the bunch. Now that all the apparatus' accelerator sections have been completed, installed and aligned, and its unaccelerated transport properties have been studied, our experimental research has reached the crucial phase of implementing appropriate accelerator schedules that approximate self-similar current-pulse compression. These schedules are established through a close interplay of computations using a one-dimensional simulation code and a manual empirical tuning procedure. In a first approach, with a rather vigorous schedule that uses most of the accelerator modules to their voltage limits, we have determined the limits of our capability for controlled pulse compression, mainly due to waveform shaping of the driving pulse-forming networks. We shall report on these results. In the future, we will also aim for gentler schedules that would model more closely an inertial confinement fusion scenario. 8 refs., 11 figs., 1 tab

  6. Cyclotron Development and Technical Aspects on Accelerator Based Laboratory Development

    International Nuclear Information System (INIS)

    Sunarhadijoso

    2000-01-01

    BATAN is planning to establish an accelerator-based laboratory at P3TM Yogyakarta as an effort in the development and use of accelerator technology for improving industrial performance and public welfare. This paper reviews several aspects of cyclotron technology and describes the combination of a linear accelerator - cyclotron system as an alternative to be considered in the planing of the laboratory. The progress of cyclotron technology is discussed covering three generations, i.e. conventional cyclotron, synchrocyclotron and AVF cyclotron generations. The planning should not consider the accelerator application for radioisotope production because it is established in Serpong with the existing negative ion cyclotron. The proposed facility at P3TM may comprise two linear accelerators coupled with a positive ion cyclotron of synchrocyclotron generation. In fact, the attachment of the synchrocyclotron unit is flexible and it can be installed subsequently if the higher energy particle beam, which can not be produced by the linear accelerators, is extremely needed. Some technical aspects related to ion beam application, building construction and infrastructure, human resources, and specification of function test are discussed for additional information in the implementation of the planning. (author)

  7. Particle Accelerators: Activities and Developments in the CIEMAT

    International Nuclear Information System (INIS)

    Garcia Tabares, L.; Toral Fernandez, F.

    2010-01-01

    Although they have been in use for many years, particle accelerators are machines in constant evolution with a growing number of applications. They are not only used in basic science to understand the structure of matter, but they also have multiple technological, medical and analytical applications, etc. This fact led the CIEMAT to create the Accelerator Unit in late 2008, as part of the Technology department. Although the group had been carrying out accelerator-related activities for some time, the aim of creating the Unit was to develop not only accelerator components but also complete systems. This article contains a brief introduction to accelerators and also describes the current activities in our Unit. (Author) 8 refs.

  8. Development of accelerator technology for biotechnology and materials science

    International Nuclear Information System (INIS)

    Arakawa, Kazuo; Saitoh, Yuichi; Kurashima, Satoshi; Yokota, Watalu

    2008-01-01

    The TIARA (Takasaki Ion accelerators for Advanced Radiation Application) is a unique worldwide facility for advancing the frontiers of biotechnology and materials science, consisting of four accelerators: a K110 AVF cyclotron, a 3-MV tandem accelerator, a 3-MV single-ended accelerator and a 400-kV ion implanter. The accelerator complex provides a variety of ion species from proton to bismuth in a wide energy range from keV to MeV. This report outlines the facility and the major beam applications, and describes the details of development of accelerator technology for biotechnology and materials science applications at TIARA. (author)

  9. High average power linear induction accelerator development

    International Nuclear Information System (INIS)

    Bayless, J.R.; Adler, R.J.

    1987-07-01

    There is increasing interest in linear induction accelerators (LIAs) for applications including free electron lasers, high power microwave generators and other types of radiation sources. Lawrence Livermore National Laboratory has developed LIA technology in combination with magnetic pulse compression techniques to achieve very impressive performance levels. In this paper we will briefly discuss the LIA concept and describe our development program. Our goals are to improve the reliability and reduce the cost of LIA systems. An accelerator is presently under construction to demonstrate these improvements at an energy of 1.6 MeV in 2 kA, 65 ns beam pulses at an average beam power of approximately 30 kW. The unique features of this system are a low cost accelerator design and an SCR-switched, magnetically compressed, pulse power system. 4 refs., 7 figs

  10. Neutral-beam development plan, FY 1982-1987

    International Nuclear Information System (INIS)

    1981-09-01

    The following chapters are included: (1) status of BNL negative ion source development, (2) source development program plan, (3) status of beam transport and acceleration, (4) accelerator development program plan, (5) neutralizer concepts, (6) neutralization program plan, (7) neutral beam systems, (8) test facilities, (9) program milestones and time schedules, (10) organization and Grumman participation, and (11) funding tables

  11. Development of compact low energy election beam accelerator

    International Nuclear Information System (INIS)

    Katsura, Ichiro

    1996-01-01

    Sumitomo Heavy Industries has developed new compact accelerator jointly with its affiliated company RPC industries and some of which have already been in use in industries. Named WIPL, or WIP, which stands for Wire Ion Plasma, this accelerator is almost half the size of existing accelerators yet with performance as high as well enough to cope with industrial requirements. Background of our determination to develop such accelerator was that there prevails fairly good numbers of small laboratory units but only small numbers of production machines are in use. The main reason which brought such environment was that those production units were husky and costly. To overcome such problem and to turn situation in favor we launched the development programme and eventually succeeded to complete WIPL. Unique feature of WIPL was materialized by adopting special method of generating electrons. Unlike existing accelerators which use heated filaments WIPL utilizes the system using electron emission by bombardment of cathode plate by helium ions as electron source. Electrons are to be generated in following manner. 1) Thin helium gas is introduced in plasma chamber in which wire(s) for applying electric power. When power is supplied helium gas is turned into helium plasma by electric field. 2) Being energized by separate high voltage power source cathode plate is charged minus simultaneously. 3) Plus charged helium ions in plasma are then accelerated toward cathode plate and hit the surface. 4) Cathode plate emits electrons by bombardment and emitted electrons are compelled by the field and accelerated to the direction which helium ion came. Since such system no longer requires insulated transformers and control system for controlling electron beam current used in filament type machines equipment becomes remarkably small and economical. We really hope that this machine is accepted widely and contributes for exploiting the new horizon of electron beam market. (author)

  12. EuCARD2: enhanced accelerator research and development in Europe

    Science.gov (United States)

    Romaniuk, Ryszard S.

    2013-10-01

    Accelerator science and technology is one of a key enablers of the developments in the particle physic, photon physics and also applications in medicine and industry. EuCARD2 is an European research project which will be realized during 2013-2017 inside the EC FP7 framework. The project concerns the development and coordination of European Accelerator Research and Development. The project is particularly important, to a number of domestic laboratories, due to some plans to build large accelerator infrastructure in Poland. Large accelerator infrastructure of fundamental and applied research character stimulates around it the development and industrial applications as well as biomedical of advanced accelerators, material research and engineering, cryo-technology, mechatronics, robotics, and in particular electronics - like networked measurement and control systems, sensors, computer systems, automation and control systems. The paper presents a digest of the European project EuCARD2 which is Enhanced European Coordination for Accelerator Research and Development. The paper presents a digest of the research results and assumptions in the domain of accelerator science and technology in Europe, shown during the final fourth annual meeting of the EuCARD - European Coordination of Accelerator R&D, and the kick-off meeting of the EuCARD2. There are debated a few basic groups of accelerator systems components like: measurement - control networks of large geometrical extent, multichannel systems for large amounts of metrological data acquisition, precision photonic networks of reference time, frequency and phase distribution, high field magnets, superconducting cavities, novel beam collimators, etc. The paper bases on the following materials: Internet and Intranet documents combined with EuCARD2, Description of Work FP7 EuCARD-2 DoW-312453, 2013-02-13, and discussions and preparatory materials worked on by Eucard-2 initiators.

  13. Comparison of the effect of accelerated and classic vaccination schedules against Hepatitis B on the short-term production of protective antibody level: a meta-analysis study

    Directory of Open Access Journals (Sweden)

    Siavash Vaziri

    2014-05-01

    Full Text Available Background: Hepatitis B is a common viral disease and one of the most common causes of cirrhosis and Hepatocellular Carcinoma (HCC. This disease is preventable via vaccination in most individuals. The aim of this study was to compare the accelerated and classic vaccination schedules against hepatitis B in the short-term production of protective antibody level. Methods: A couple of scientific internet resources were searched to find the relevant studies. The abstracts of 156 studies and full texts of some of them were reviewed and finally, 19 articles relevant to the objective of the study were selected. From among the 19 articles remained, 11 articles with a score of 3 out of 5 (JADAD SCORE were included as high quality studies. Results: The antibody level of 10 mIU/ml or above was considered as positive vaccination response. According to the results of random effect model, no statistically significant difference was reported between the accelerated and conventional vaccination methods in terms of serum protection (OR=0653, CI: 0.425-1.004. However, it seems that the accelerated method is less strong. Conclusion: Although it seems accelerated vaccination method has less power, the difference has been trivial in most of the studies. Accelerated vaccination is recommended in situations where faster protective antibody level is needed.

  14. Development of a 20 MeV Dielectric-Loaded Test Accelerator

    International Nuclear Information System (INIS)

    Gold, Steven H.; Fliflet, Arne W.; Lombardi, Marcie; Kinkead, Allen K.; Gai, Wei; Power, John G.; Konecny, Richard; Long, Jidong; Jing, Chunguang; Tantawi, Sami G.; Nantista, Christopher D.; Bruce, Ralph W.; Lewis, David III

    2006-01-01

    This paper presents a progress report on a joint project by the Naval Research Laboratory (NRL) and Argonne National Laboratory (ANL), in collaboration with the Stanford Linear Accelerator Center (SLAC), to develop a dielectric-loaded test accelerator in the magnicon facility at NRL. The accelerator will be powered by an experimental 11.424-GHz magnicon amplifier that presently produces 25 MW of output power in a ∼250-ns pulse at up to 10 Hz. The accelerator will include a 5-MeV electron injector originally developed at the Tsinghua University in Beijing, China, and can incorporate DLA structures up to 0.5 m in length. The DLA structures are being developed by ANL, and shorter test structures fabricated from a variety of dielectric materials have undergone testing at NRL at gradients up to ∼8 MV/m. SLAC has developed components to distribute the power from the two magnicon output arms to the injector and to the DLA accelerating structure with separate control of the power ratio and relative phase. RWBruce Associates, Inc., working with NRL, has investigated means to join short ceramic sections into a continuous accelerator tube by a brazing process using an intense 83-GHz beam. The installation and testing of the first dielectric-loaded test accelerator, including injector, DLA test structure, and spectrometer, should take place within the next year

  15. Second International Conference on Accelerating Biopharmaceutical Development

    Science.gov (United States)

    2009-01-01

    The Second International Conference on Accelerating Biopharmaceutical Development was held in Coronado, California. The meeting was organized by the Society for Biological Engineering (SBE) and the American Institute of Chemical Engineers (AIChE); SBE is a technological community of the AIChE. Bob Adamson (Wyeth) and Chuck Goochee (Centocor) were co-chairs of the event, which had the theme “Delivering cost-effective, robust processes and methods quickly and efficiently.” The first day focused on emerging disruptive technologies and cutting-edge analytical techniques. Day two featured presentations on accelerated cell culture process development, critical quality attributes, specifications and comparability, and high throughput protein formulation development. The final day was dedicated to discussion of technology options and new analysis methods provided by emerging disruptive technologies; functional interaction, integration and synergy in platform development; and rapid and economic purification process development. PMID:20065637

  16. Development of an improved installation procedure and schedule of RVI modularization for APR1400

    International Nuclear Information System (INIS)

    Ko, Do Young

    2011-01-01

    The construction technology for reactor vessel internals (RVI) modularization is one of the most important factors to be considered in reducing the construction period of nuclear power plants. For RVI modularization, gaps between the reactor vessel (RV) core-stabilizing lug and the core support barrel (CSB) snubber lug must be measured using a remote method from outside the RV. In order to measure RVI gaps remotely at nuclear power plant construction sites, certain core technologies must be developed and verified. These include a remote measurement system to measure the gaps between the RV core-stabilizing lug and the CSB snubber lug, an RVI mockup to perform the gap measurement tests, and a new procedure and schedule for RVI installation. A remote measurement system was developed previously, and a gap measurement test was completed successfully using the RVI mockup. We also developed a new procedure and schedule for RVI installation. This paper presents the new and improved installation procedure and schedule for RVI modularization. These are expected to become core technologies that will allow us to shorten the construction period by a minimum of two months compared to the existing installation procedure and schedule

  17. The creation and development of new physics of acceleration

    International Nuclear Information System (INIS)

    Bonch-Osmolovskij, A.G.

    1992-01-01

    The creation and stages of development of the new field of physics - the physics of the dense charge-particle ensembles and connected with it new principles of acceleration are considered. In brief form the explanation of the essence of the physics of new acceleration methods was given, their state and perspectives of their development were pictures. 13 refs

  18. Development of Accident Scenarios and Quantification Methodology for RAON Accelerator

    International Nuclear Information System (INIS)

    Lee, Yongjin; Jae, Moosung

    2014-01-01

    The RIsp (Rare Isotope Science Project) plans to provide neutron-rich isotopes (RIs) and stable heavy ion beams. The accelerator is defined as radiation production system according to Nuclear Safety Law. Therefore, it needs strict operate procedures and safety assurance to prevent radiation exposure. In order to satisfy this condition, there is a need for evaluating potential risk of accelerator from the design stage itself. Though some of PSA researches have been conducted for accelerator, most of them focus on not general accident sequence but simple explanation of accident. In this paper, general accident scenarios are developed by Event Tree and deduce new quantification methodology of Event Tree. In this study, some initial events, which may occur in the accelerator, are selected. Using selected initial events, the accident scenarios of accelerator facility are developed with Event Tree. These results can be used as basic data of the accelerator for future risk assessments. After analyzing the probability of each heading, it is possible to conduct quantification and evaluate the significance of the accident result. If there is a development of the accident scenario for external events, risk assessment of entire accelerator facility will be completed. To reduce the uncertainty of the Event Tree, it is possible to produce a reliable data via the presented quantification techniques

  19. NASA scheduling technologies

    Science.gov (United States)

    Adair, Jerry R.

    1994-01-01

    This paper is a consolidated report on ten major planning and scheduling systems that have been developed by the National Aeronautics and Space Administration (NASA). A description of each system, its components, and how it could be potentially used in private industry is provided in this paper. The planning and scheduling technology represented by the systems ranges from activity based scheduling employing artificial intelligence (AI) techniques to constraint based, iterative repair scheduling. The space related application domains in which the systems have been deployed vary from Space Shuttle monitoring during launch countdown to long term Hubble Space Telescope (HST) scheduling. This paper also describes any correlation that may exist between the work done on different planning and scheduling systems. Finally, this paper documents the lessons learned from the work and research performed in planning and scheduling technology and describes the areas where future work will be conducted.

  20. Nb3Sn accelerator magnet development around the world

    Energy Technology Data Exchange (ETDEWEB)

    Michael J. Lamm

    2003-06-23

    During the past 30 years superconducting magnet systems have enabled accelerators to achieve energies and luminosities that would have been impractical if not impossible with resistive magnets. By far, NbTi has been the preferred conductor for this application because of its ductility and insensitivity of Jc to mechanical strain. This is despite the fact that Nb{sub 3}Sn has a more favorable Jc vs. B dependence and can operate at much higher temperatures. Unfortunately, NbTi conductor is reaching the limit of it usefulness for high field applications. Despite incremental increases in Jc and operation at superfluid temperatures, magnets are limited to approximately a 10 T field. Improvements in conductor performance combined with future requirements for accelerator magnets to have bore fields greater than 10 T or operate in areas of large beam-induced heat loads now make Nb{sub 3}Sn look attractive. Thus, laboratories in several countries are actively engaged in programs to develop Nb{sub 3}Sn accelerator magnets for future accelerator applications. A summary of this important research activity is presented along with a brief history of Nb{sub 3}Sn accelerator magnet development and a discussion of requirements for future accelerator magnets.

  1. Accelerated leach test development program

    International Nuclear Information System (INIS)

    Fuhrmann, M.; Pietrzak, R.F.; Heiser, J.; Franz, E.M.; Colombo, P.

    1990-11-01

    In FY 1989, a draft accelerated leach test for solidified waste was written. Combined test conditions that accelerate leaching were validated through experimental and modeling efforts. A computer program was developed that calculates test results and models leaching mechanisms. This program allows the user to determine if diffusion controls leaching and, if this is the case, to make projections of releases. Leaching mechanisms other than diffusion (diffusion plus source term partitioning and solubility limited leaching) are included in the program is indicators of other processes that may control leaching. Leach test data are presented and modeling results are discussed for laboratory scale waste forms composed of portland cement containing sodium sulfate salt, portland cement containing incinerator ash, and vinyl ester-styrene containing sodium sulfate. 16 refs., 38 figs., 5 tabs

  2. Development of a 20 MeV Dielectric-Loaded Accelerator Test Facility

    International Nuclear Information System (INIS)

    Gold, Steven H.; Fliflet, Arne W.; Kinkead, Allen K.; Gai Wei; Power, John G.; Konecny, Richard; Jing Chunguang; Tantawi, Sami G.; Nantista, Christopher D.; Hu, Y.; Chen, H.; Tang, C.; Lin, Y.; Bruce, Ralph W.; Bruce, Robert L.; Lewis, David III

    2004-01-01

    This paper describes a joint project by the Naval Research Laboratory (NRL) and Argonne National Laboratory (ANL), in collaboration with the StanFord Linear Accelerator Center (SLAC), to develop a dielectric-loaded accelerator (DLA) test facility powered by a high-power 11.424-GHz magnicon amplifier. The magnicon can presently produce 25 MW of output power in a 250-ns pulse at 10 Hz, and efforts are in progress to increase this to 50 MW. The facility will include a 5 MeV electron injector being developed by the Accelerator Laboratory of Tsinghua University in Beijing, China. The DLA test structures are being developed by ANL, and some have undergone testing at NRL at gradients up to ∼8 MV/m. SLAC is developing a means to combine the two magnicon output arms, and to drive an injector and accelerator with separate control of the power ratio and relative phase. RWBruce Associates, Inc., working with NRL, is developing a means to join short ceramic sections into a continuous accelerator tube by ceramic brazing using an intense millimeter-wave beam. The installation and testing of the first dielectric-loaded test accelerator, including injector, DLA structure, and spectrometer, should take place within the next year. The facility will be used for testing DLA structures using a variety of materials and configurations, and also for testing other X-band accelerator concepts. The initial goal is to produce a compact 20 MeV dielectric-loaded test accelerator

  3. Techniques for establishing schedules with wheel running as reinforcement in rats.

    Science.gov (United States)

    Iversen, I H

    1993-07-01

    In three experiments, access to wheel running was contingent on lever pressing. In each experiment, the duration of access to running was reduced gradually to 4, 5, or 6 s, and the schedule parameters were expanded gradually. The sessions lasted 2 hr. In Experiment 1, a fixed-ratio 20 schedule controlled a typical break-and-run pattern of lever pressing that was maintained throughout the session for 3 rats. In Experiment 2, a fixed-interval schedule of 6 min maintained lever pressing throughout the session for 3 rats, and for 1 rat, the rate of lever pressing was positively accelerated between reinforcements. In Experiment 3, a variable-ratio schedule of 20 or 35 was in effect and maintained lever pressing at a very stable pace throughout the session for 2 of 3 rats; for 1 rat, lever pressing was maintained at an irregular rate. When the session duration was extended to successive 24-hr periods, with food and water accessible in Experiment 3, lever pressing settled into a periodic pattern occurring at a high rate at approximately the same time each day. In each experiment, the rats that developed the highest local rates of running during wheel access also maintained the most stable and highest rates of lever pressing.

  4. Accelerator development for a radioactive beam facility based on ATLAS

    International Nuclear Information System (INIS)

    Shepard, K. W.

    1998-01-01

    The existing superconducting linac ATLAS is in many respects an ideal secondary beam accelerator for an ISOL (Isotope separator on-line) type radioactive beam facility. Such a facility would require the addition of two major accelerator elements: a low charge state injector for the existing heavy ion linac, and a primary beam accelerator providing 220 MV of acceleration for protons and light ions. Development work for both of these elements, including the option of superconducting cavities for the primary beam accelerator is discussed

  5. Accelerator development for a radioactive beam facility based on ATLAS.

    Energy Technology Data Exchange (ETDEWEB)

    Shepard, K. W.

    1998-01-08

    The existing superconducting linac ATLAS is in many respects an ideal secondary beam accelerator for an ISOL (Isotope separator on-line) type radioactive beam facility. Such a facility would require the addition of two major accelerator elements: a low charge state injector for the existing heavy ion linac, and a primary beam accelerator providing 220 MV of acceleration for protons and light ions. Development work for both of these elements, including the option of superconducting cavities for the primary beam accelerator is discussed.

  6. Development of small C-band standing-wave accelerator structure

    International Nuclear Information System (INIS)

    Miura, S.; Takahashi, A.; Hisanaga, N.; Sekido, H.; Yoshizumi, A.

    2000-01-01

    We have newly developed a compact C-band (5712 MHz) standing-wave accelerator for the medical product/waste sterilization applications. The accelerator consists of an electron gun operating at 25 kV DC followed by a single-cell pre-buncher and 3-cell buncher section, and 11-cell of the side-coupled standing-wave accelerating structure. The total length including the electron gun is about 600 mm. The first high-power test was performed in March 2000, where the accelerator successively generated the electron beam of 9 MeV energy and 160 mA peak-current at 3.8 MW RF input power. Mitsubishi Heavy Industry starts to serve the sterilization systems using C-band accelerator reported here, and also supplies the accelerator components for the medical oncology applications. (author)

  7. Recent Developments in Hadron Therapy Accelerators

    CERN Document Server

    Klein, Hans-Udo

    2005-01-01

    In the last decade interest and investments in Hadron Therapy Systems have been steadily increasing resulting in a substantial number of projects currently under construction or entering detailed planning stage. Main routes are pure proton therapy systems and Carbon ion therapy systems which can also run on protons. While the basic accelerator concept for hadron therapy systems is well established there are many considerations on the type and layout of the particle delivery system including the accelerator, an energy selection system, either a fixed beam set up or a rotating gantry, the "nozzle" containing either a scattering or a scanning system, the patient positioner, and all associated control systems. The requirements for the accelerator include most stable beams to match the demand of modern fast scanning systems as well as fast switching between treatment rooms. Currently an ion/proton synchrotron, a pure proton synchrotron, a normalconducting proton cyclotron and a newly developed compact superconduct...

  8. Development of circular protons accelerator for ocular teletherapy

    International Nuclear Information System (INIS)

    Rabelo, L. A.; Campos, T.P.R.

    2011-01-01

    The proton therapy has been used for ocular tumors providing tumor control in most cases and vision preservations. The protons show high doses in depth depict lower scattering from beam than other particles, electrons and photons. The cyclotron is a type of accelerator that increases the kinetic energy of the charged particle, recirculating it on a magnetic field and crossing an accelerating electrical field. It can be used to produce radioisotopes to hospitals. The goal of this study is to investigate a unit of circular accelerator to be coupled in existing national cyclotrons to generate a proton beams suitable to ocular therapy. Herein, physical parameters are evaluable, including relativistic corrections. That result shows the viability of developing an accelerator unit to ocular proton therapy. (author)

  9. SSC accelerator availability allocation

    International Nuclear Information System (INIS)

    Dixon, K.T.; Franciscovich, J.

    1991-03-01

    Superconducting Super Collider (SSC) operational availability is an area of major concern, judged by the Central Design Group to present such risk that use of modern engineering tools would be essential to program success. Experience has shown that as accelerator beam availability falls below about 80%, efficiency of physics experiments degrades rapidly due to inability to maintain adequate coincident accelerator and detector operation. For this reason, the SSC availability goal has been set at 80%, even though the Fermi National Accelerator Laboratory accelerator, with a fraction of the SSC's complexity, has only recently approached that level. This paper describes the allocation of the top-level goal to part-level reliability and maintainability requirements, and it gives the results of parameter sensitivity studies designed to help identify the best approach to achieve the needed system availability within funding and schedule constraints. 1 ref., 12 figs., 4 tabs

  10. Development of an accelerator for X-ray inspection apparatus with high clairvoyance

    CERN Document Server

    Onishi, T

    2002-01-01

    At present, there is no portable X-ray generator usable for non-destructive inspection of thick concretes used for bridges, and so on. To enable on non-destructive inspection of such thick concrete materials with more than 300 mm in thickness, authors developed a new small size accelerator with same acceleration principle as that of betatron. And, the authors also developed two types of new induction accelerators such as 'spiral orbit type' and 'cylindrical type'. Furthermore, development of a detector with excellent sensitivity to X-ray with wavelength suitable for inspection and software for image processing are planned. Here was described acceleration principles of new accelerators, test results on prototypes of the accelerators, and development states on field emission array considering new electron gun alternating thermal one and cold cathode type electron gun using carbon nano-tubes. (G.K.)

  11. Designing cyclic appointment schedules for outpatient clinics with scheduled and unscheduled patient arrivals

    NARCIS (Netherlands)

    Kortbeek, Nikky; Zonderland, Maartje E.; Braaksma, Aleida; Vliegen, Ingrid M. H.; Boucherie, Richard J.; Litvak, Nelly; Hans, Erwin W.

    2014-01-01

    We present a methodology to design appointment systems for outpatient clinics and diagnostic facilities that offer both walk-in and scheduled service. The developed blueprint for the appointment schedule prescribes the number of appointments to plan per day and the moment on the day to schedule the

  12. Designing cyclic appointment schedules for outpatient clinics with scheduled and unscheduled patient arrivals

    NARCIS (Netherlands)

    Kortbeek, Nikky; Zonderland, Maartje Elisabeth; Boucherie, Richardus J.; Litvak, Nelli; Hans, Elias W.

    2011-01-01

    We present a methodology to design appointment systems for outpatient clinics and diagnostic facilities that offer both walk-in and scheduled service. The developed blueprint for the appointment schedule prescribes the number of appointments to plan per day and the moment on the day to schedule the

  13. New developments in particle acceleration techniques. Proceedings. Vol. 2

    International Nuclear Information System (INIS)

    Turner, S.

    1987-01-01

    A Workshop organised jointly by the European Committee for Future Accelerators (ECFA), the CERN Accelerator School (CAS), the Institut National de Physique Nucleaire et de Physique des Particules (IN2P3), the Institut pour la Recherche Fondamentale/Commissariat a l'Energie Atomique (IRF/CEA) and the European Physical Society (EPS) was held at the Laboratoire de l'Accelerateur Lineaire (LAL), Orsay, from 29 June to 4 July 1987. Its purpose was to review current experimental and theoretical developments in charged-particle accelerator techniques and to address problems related to future very-high-energy machines. These proceedings contain the great majority of the papers presented at the Workshop, the corresponding questions and answers, and the round-table discussion. The principal topics were semi-conventional high-frequency linacs, transformer acceleration mechanisms, acceleration using plasma, e + e - sources, including low-emittance production and preservation, final focus and interaction point, and other new ideas. Among the latter were open accelerating structures, crystal X-ray accelerators, ferroelectrics, and acceleration using lasers. (orig.)

  14. New developments in particle acceleration techniques. Proceedings. Vol. 1

    International Nuclear Information System (INIS)

    Turner, S.

    1987-01-01

    A Workshop organised jointly by the European Committee for Future Accelerators (ECFA), the CERN Accelerator School (CAS), the Institut National de Physique Nucleaire et de Physique des Particules (IN2P3), the Institut pour la Recherche Fondamentale/Commissariat a l'Energie Atomique (IRF/CEA) and the European Physical Society (EPS) was held at the Laboratoire de l'Accelerateur Lineaire (LAL), Orsay, from 29 June to 4 July 1987. Its purpose was to review current experimental and theoretical developments in charged-particle accelerator techniques and to address problems related to future very-high-energy machines. These proceedings contain the great majority of the papers presented at the Workshop, the corresponding questions and answers, and the round-table discussion. The principal topics were semi-conventional high-frequency linacs, transformer acceleration mechanisms, acceleration using plasma, e + e - sources including low-emittance production and preservation, final focus and interaction point, and other new ideas. Among the latter were open accelerating structures, crystal X-ray accelerators, ferroelectrics, and acceleration using lasers. (orig.)

  15. Accelerator structure development for NLC

    International Nuclear Information System (INIS)

    Hoag, H.A.; Deruyter, H.; Pearson, C.; Ruth, R.D.; Wang, J.W.; Schaefer, J.

    1993-04-01

    In the program of work directed towards the development of an X-Band Next Linear Collider accelerator structure, two different test accelerator sections have been completed, and a third is being fabricated. The first is a simple 30-cell constant-impedance section in which no special attention was given to surface finish, pumping, and alignment. The second is an 86-cell section in which the cells were precision diamond-turned by Texas Instruments Inc. The structure has internal water-cooling and vacuum pumping manifolds. Some design details are given for the third section, which is a 206-cell structure with cavities dimensioned to give a Gaussian distribution of dipole mode frequencies. It has conventional-machining surface finishes and external water and pumping manifolds. Component design, fabrication, and assembly brazing are described for the first two experimental sections

  16. Separations technology development to support accelerator-driven transmutation concepts

    International Nuclear Information System (INIS)

    Venneri, F.; Arthur, E.; Bowman, C.

    1996-01-01

    This is the final report of a one-year Laboratory-Directed Research and Development (LDRD) Project at the Los Alamos National Laboratory (LANL). This project investigated separations technology development needed for accelerator-driven transmutation technology (ADTT) concepts, particularly those associated with plutonium disposition (accelerator-based conversion, ABC) and high-level radioactive waste transmutation (accelerator transmutation of waste, ATW). Specific focus areas included separations needed for preparation of feeds to ABC and ATW systems, for example from spent reactor fuel sources, those required within an ABC/ATW system for material recycle and recovery of key long-lived radionuclides for further transmutation, and those required for reuse and cleanup of molten fluoride salts. The project also featured beginning experimental development in areas associated with a small molten-salt test loop and exploratory centrifugal separations systems

  17. Development of High Power Vacuum Tubes for Accelerators and Plasma Heating

    International Nuclear Information System (INIS)

    Srivastava, Vishnu

    2012-01-01

    High pulsed power magnetrons and klystrons for medical and industrial accelerators, and high CW power klystrons and gyrotrons for plasma heating in tokamak, are being developed at CEERI. S-band 2.0MW pulsed tunable magnetrons of centre frequency 2856MHz and 2998 MHz were developed, and S-band 2.6MW pulsed tunable magnetron is being developed for medical LINAC, and 3MW pulsed tunable magnetron is being developed for industrial accelerator. S-band (2856MHz), 5MW pulsed klystron was developed for particle accelerator, and S-band 6MW pulsed klystron is under development for 10MeV industrial accelerator. 350MHz, 100kW (CW) klystron is being developed for proton accelerator, and C-band 250kW (CW) klystron is being developed for plasma heating. 42GHz, 200kW (CW/Long pulse) gyrotron is under development for plasma heating. Plasma filled tubes are also being developed for switching. 25kV/1kA and 40kV/3kA thyratrons were developed for high voltage high current switching in pulse modulators for magnetrons and klystrons. 25kV/3kA Pseudospark switch of current rise time of 1kA/|a-sec and pulse repetition rate of 500Hz is being developed. Plasma assisted high power microwave device is also being investigated.

  18. Development of High Power Vacuum Tubes for Accelerators and Plasma Heating

    Science.gov (United States)

    Srivastava, Vishnu

    2012-11-01

    High pulsed power magnetrons and klystrons for medical and industrial accelerators, and high CW power klystrons and gyrotrons for plasma heating in tokamak, are being developed at CEERI. S-band 2.0MW pulsed tunable magnetrons of centre frequency 2856MHz and 2998 MHz were developed, and S-band 2.6MW pulsed tunable magnetron is being developed for medical LINAC, and 3MW pulsed tunable magnetron is being developed for industrial accelerator. S-band (2856MHz), 5MW pulsed klystron was developed for particle accelerator, and S-band 6MW pulsed klystron is under development for 10MeV industrial accelerator. 350MHz, 100kW (CW) klystron is being developed for proton accelerator, and C-band 250kW (CW) klystron is being developed for plasma heating. 42GHz, 200kW (CW/Long pulse) gyrotron is under development for plasma heating. Plasma filled tubes are also being developed for switching. 25kV/1kA and 40kV/3kA thyratrons were developed for high voltage high current switching in pulse modulators for magnetrons and klystrons. 25kV/3kA Pseudospark switch of current rise time of 1kA/|a-sec and pulse repetition rate of 500Hz is being developed. Plasma assisted high power microwave device is also being investigated.

  19. Applications of proton and deuteron accelerators

    Energy Technology Data Exchange (ETDEWEB)

    Todd, A.M.M. (Grumman Corporate Research Center, Princeton, NJ (United States))

    1993-06-01

    Applications of positive and negative hydrogen and deuterium ion accelerators beyond basic research are increasing. Large scale proposed national laboratory/industrial projects include the Accelerator Production of Tritium (APT) which will utilize protons, and the International Fusion Material Irradiation Facility (IFMIF) which will accelerate a deuteron beam into a lithium target. At the small scale end, radio-frequency quadrupole (RFQ) accelerator based systems have been built for neutron activation analysis and for applications such as explosive detection. At an intermediate scale, the Loma Linda proton therapy accelerator is now successfully treating a full schedule of patients, and more than half a dozen such hospital based units are under active study world-wide. At this same scale, there are also several ongoing negative ion, military accelerator projects which include the Continuous Wave Deuterium Demonstrator (CWDD) and the Neutral Particle Beam Space Experiment (NPBSE). These respective deuterium and hydrogen accelerators, which have not been previously described, are the focus of this paper. (orig.)

  20. Developing an environmental compliance program for accelerator production of tritium

    International Nuclear Information System (INIS)

    Reynolds, R.W.; Roberts, J.S.; Dyer, K.W.; Shedrow, C.B.; Sheetz, S.O.; England, J.L.

    1998-01-01

    This paper addresses the development of an environmental program for a large proposed federal project currently in the preliminary design phase, namely, the accelerator production of tritium (APT) for the US Department of Energy (DOE). This project is complicated not only by its size ($3.5 to $4.5 billion) but also by its technical complexity and one-of-a-kind nature. This is further complicated by the fact that government projects are driven by budgets subject to public pressures and annual Congressional fiscal considerations, whereas private companies are driven by profits. The measure of success for a federal project such as the APT is based on level of public support, not profits. Finally, there are not too many equivalent environmental programs that could be used as models, and benchmarking is nearly impossible. Forming an environmental program during the conceptual design phase of this large federal project included the formation of a core environmental working group (EWG). The group has membership from all major project organizations with a charter formally recognized by the project director. The envelope for traditional environmental work for the APT project has been stretched to include teaming with management in the establishment of project goals and direction. The APT EWG was set up organizationally to include several subgroups or teams that do the real work of assessing, establishing the regulatory framework, and then developing a compliance program. Setting aside the organizational difficulties of selecting the right team leads and members, each team was tasked with developing a charter, plan, and schedule. Since then, each team has developed an appropriate level of supporting documentation to address its particular issues and requirements

  1. 76 FR 50224 - Medicare Program; Accountable Care Organization Accelerated Development Learning Sessions; Center...

    Science.gov (United States)

    2011-08-12

    ...] Medicare Program; Accountable Care Organization Accelerated Development Learning Sessions; Center for... (CMS). This two-day training session is the second Accelerated Development Learning Session (ADLS.... Through Accelerated Development Learning Sessions (ADLS), the Innovation Center will test whether...

  2. Analysis of Issues for Project Scheduling by Multiple, Dispersed Schedulers (distributed Scheduling) and Requirements for Manual Protocols and Computer-based Support

    Science.gov (United States)

    Richards, Stephen F.

    1991-01-01

    Although computerized operations have significant gains realized in many areas, one area, scheduling, has enjoyed few benefits from automation. The traditional methods of industrial engineering and operations research have not proven robust enough to handle the complexities associated with the scheduling of realistic problems. To address this need, NASA has developed the computer-aided scheduling system (COMPASS), a sophisticated, interactive scheduling tool that is in wide-spread use within NASA and the contractor community. Therefore, COMPASS provides no explicit support for the large class of problems in which several people, perhaps at various locations, build separate schedules that share a common pool of resources. This research examines the issue of distributing scheduling, as applied to application domains characterized by the partial ordering of tasks, limited resources, and time restrictions. The focus of this research is on identifying issues related to distributed scheduling, locating applicable problem domains within NASA, and suggesting areas for ongoing research. The issues that this research identifies are goals, rescheduling requirements, database support, the need for communication and coordination among individual schedulers, the potential for expert system support for scheduling, and the possibility of integrating artificially intelligent schedulers into a network of human schedulers.

  3. Gaussian variable neighborhood search for the file transfer scheduling problem

    Directory of Open Access Journals (Sweden)

    Dražić Zorica

    2016-01-01

    Full Text Available This paper presents new modifications of Variable Neighborhood Search approach for solving the file transfer scheduling problem. To obtain better solutions in a small neighborhood of a current solution, we implement two new local search procedures. As Gaussian Variable Neighborhood Search showed promising results when solving continuous optimization problems, its implementation in solving the discrete file transfer scheduling problem is also presented. In order to apply this continuous optimization method to solve the discrete problem, mapping of uncountable set of feasible solutions into a finite set is performed. Both local search modifications gave better results for the large size instances, as well as better average performance for medium and large size instances. One local search modification achieved significant acceleration of the algorithm. The numerical experiments showed that the results obtained by Gaussian modifications are comparable with the results obtained by standard VNS based algorithms, developed for combinatorial optimization. In some cases Gaussian modifications gave even better results. [Projekat Ministarstava nauke Republike Srbije, br. 174010

  4. Automated Scheduling Via Artificial Intelligence

    Science.gov (United States)

    Biefeld, Eric W.; Cooper, Lynne P.

    1991-01-01

    Artificial-intelligence software that automates scheduling developed in Operations Mission Planner (OMP) research project. Software used in both generation of new schedules and modification of existing schedules in view of changes in tasks and/or available resources. Approach based on iterative refinement. Although project focused upon scheduling of operations of scientific instruments and other equipment aboard spacecraft, also applicable to such terrestrial problems as scheduling production in factory.

  5. Development of C-band Accelerating Section for SuperKEKB

    CERN Document Server

    Kamitani, T; Ikeda, M; Kakihara, K; Ohsawa, S; Oogoe, T; Sugimura, T; Takatomi, T; Yamaguchi, S; Yokoyama, K

    2004-01-01

    For the luminosity upgrade of the present KEK B-factory to SuperKEKB, the injector linac has to increase the positron acceleration energy from 3.5 to 8.0 GeV. In order to double the acceleration field gradient from 21 to 42 MV/m, design studies on C-band accelerator module has started in 2002. First prototype 1-m long accelerating section has been fabricated based upon a design which is half scale of the present S-band section. High power test of the C-band section has been performed at a test stand and later at an accelerator module in the KEKB injector linac. In a beam acceleration test, a field gradient of 41 MV/m is achieved with 43 MW RF power from a klystron. This paper report on the recent status of the high-power test and also the development of a second prototype section.

  6. 76 FR 66931 - Medicare Program; Accountable Care Organization Accelerated Development Learning Sessions; Center...

    Science.gov (United States)

    2011-10-28

    ...] Medicare Program; Accountable Care Organization Accelerated Development Learning Sessions; Center for... Services (CMS). This two-day training session is the third and final Accelerated Development Learning... the quality of care for beneficiaries. Through Accelerated Development Learning Sessions (ADLS), the...

  7. Graduate Student Program in Materials and Engineering Research and Development for Future Accelerators

    Energy Technology Data Exchange (ETDEWEB)

    Spentzouris, Linda [Illinois Inst. of Technology, Chicago, IL (United States)

    2016-07-07

    The objective of the proposal was to develop graduate student training in materials and engineering research relevant to the development of particle accelerators. Many components used in today's accelerators or storage rings are at the limit of performance. The path forward in many cases requires the development of new materials or fabrication techniques, or a novel engineering approach. Often, accelerator-based laboratories find it difficult to get top-level engineers or materials experts with the motivation to work on these problems. The three years of funding provided by this grant was used to support development of accelerator components through a multidisciplinary approach that cut across the disciplinary boundaries of accelerator physics, materials science, and surface chemistry. The following results were achieved: (1) significant scientific results on fabrication of novel photocathodes, (2) application of surface science and superconducting materials expertise to accelerator problems through faculty involvement, (3) development of instrumentation for fabrication and characterization of materials for accelerator components, (4) student involvement with problems at the interface of material science and accelerator physics.

  8. Radionuclide production for PET with a linear electrostatic accelerator

    International Nuclear Information System (INIS)

    Shefer, R.E.; Hughey, B.J.; Klinkowstein, R.E.; Welch, M.J.

    1993-01-01

    A new type of linear electrostatic accelerator for the production of short-lived radionuclides for PET has been developed at Science Research Laboratory. The tandem cascade accelerator (TCA) is a low energy (3.7 MeV) proton and deuteron accelerator which can generate the four short-lived PET radionuclides in the quantities required for clinical use. The compact size, low weight, low power consumption and reduced radiation shielding requirements of the TCA result in a significant reduction in capital and operating costs when compared with higher energy cyclotron-based systems. Radioisotope target for the production of O-15, F-18, N-13 and C-11 have been designed specifically for use with the low energy TCA beam. A simple to use PC-based computer control system allows fully automated system operation and advanced scheduling of isotope production. Operating experience with the TCA and its PET radionuclide targets is described

  9. Scheduling the scheduling task : a time management perspective on scheduling

    NARCIS (Netherlands)

    Larco Martinelli, J.A.; Wiers, V.C.S.; Fransoo, J.C.

    2013-01-01

    Time is the most critical resource at the disposal of schedulers. Hence, an adequate management of time from the schedulers may impact positively on the scheduler’s productivity and responsiveness to uncertain scheduling environments. This paper presents a field study of how schedulers make use of

  10. Accelerated Leadership Development: Fast Tracking School Leaders

    Science.gov (United States)

    Earley, Peter; Jones, Jeff

    2010-01-01

    "Accelerated Leadership Development" captures and communicates the lessons learned from successful fast-track leadership programmes in the private and public sector, and provides a model which schools can follow and customize as they plan their own leadership development strategies. As large numbers of headteachers and other senior staff…

  11. Technology Development for the Accelerator Production of Tritium

    International Nuclear Information System (INIS)

    Anderson, J.L.

    1999-01-01

    The ED and D described in this report provide technical data on the performance of all critical components of the APT facility. Results are compared with requirements given. This data will be utilized to establish confidence in the design, in the predicted plant availability, and to reduce cost when the data warrants design simplification. Thus, if at a later date it is decided to build the APT plant, this will allow the facility to be built correctly the first time, on schedule, without recourse to costly over-design. It should also speed the commissioning process and ensure that full capacity production is attained on schedule. The planning process used to develop the elements of the CTP has been described. This program is expected to provide the needed data within the projected schedule and resources. Specific schedules for delivery of data and descriptions of the needed data are contained in the Design Data Needs. The total cost of the ED and D program is on the order of 10% of the project cost and is considered a very good investment. The CTP will be judged a success when the data produced warrants design simplifications that allow reduction of design margins and cost. Present day contingency estimates for the project greatly exceed 10% and it is expected that CTP data will warrant reduction of those contingencies by more than the cost of data production. Even results that do not simplify the design or reduce cost are considered very important and successful if they firmly establish performance, so that the design is validated and the cost certified within the existing contingencies. Nevertheless, there is technical risk in some APT components that warrant careful attention. It is to be expected that some results could be disappointing and may require design changes that increase cost moderately beyond the existing contingencies or cause moderate schedule slips

  12. High Field Studies for CLIC Accelerating Structures Development

    CERN Document Server

    Profatilova, I

    2017-01-01

    Compact Linear Collider RF structures need to be able to achieve the very high average accelerating gradient of 100 MV/m. One of the main challenges in reaching such high accelerating gradients is to avoid vacuum electrical breakdown within CLIC accelerating structures. Accelerating structure tests are carried out in the klystron-based test stands known as the XBoxes. In order to investigate vacuum breakdown phenomena and its statistical characteristics in a simpler system and get results in a faster way, pulsed dc systems have been developed at CERN. To acquire sufficient breakdown data in a reasonable period of time, high repetition rate pulse generators are used in the systems for breakdown studies, so-called pulsed dc system. This paper describes the pulsed dc systems and the two high repetition rate circuits, which produce high-voltage pulses for it, available at CERN.

  13. History of the development and manufacture of Czechoslovak high-frequency linear electron accelerators

    International Nuclear Information System (INIS)

    Cerny, R.

    2007-01-01

    The paper is structured as follows: History of linear accelerators worldwide (beginnings); Development of the Czechoslovak high-frequency linear electron accelerator (Layout and working principle; The first model of the accelerator and the Faculty of Technical and Nuclear Physics and cooperation with the Research Institute for Vacuum Electronics (VUVET); Continuing development of the accelerator at VUVET); Construction of linear accelerators at VUVET and their application (Construction of the accelerating unit; UR 4/1200 accelerator for radiation technology tests at VUVET; UR 4PR ('LUPUR') accelerator for the Nuclear Research Institute at Rez; UR 4/1200 technological accelerator for the Nuclear Research Institute at Rez; LPR4 accelerator for the Hungarian Academy of Sciences; L 4/1200 accelerators for the Research Institute of Cables and Insulators in Bratislava, CKD Semiconductors in Prague, Animal Feed Research Institute at Ivanka pri Dunaji, and Synthesia Semtin). Appendix contains paragraphs devoted to the Accelerator Dept. staff and equipment, key accelerator spare parts, and radiation safety at the accelerator department, (P.A.)

  14. Development of a distributed control system for the JAERI tandem accelerator facility

    International Nuclear Information System (INIS)

    Hanashima, Susumu

    2005-01-01

    In the JAERI tandem accelerator facility, we are building accelerator complex aiming generation and acceleration of radio nuclear beam. Several accelerators, ion sources and a charge breeder are installed in the facility. We are developing a distributed control system enabling smooth operation of the facility. We report basic concepts of the control system in this article. We also describe about a control hardware using plastic optical fiber, which is developed for the control system. (author)

  15. Accelerator-driven neutron sources for materials research

    International Nuclear Information System (INIS)

    Jameson, R.A.

    1990-01-01

    Particle accelerators are important tools for materials research and production. Advances in high-intensity linear accelerator technology make it possible to consider enhanced neutron sources for fusion material studies or as a source of spallation neutrons. Energy variability, uniformity of target dose distribution, target bombardment from multiple directions, time-scheduled dose patterns, and other features can be provided, opening new experimental opportunities. New designs have also been used to ensure hands-on maintenance on the accelerator in these factory-type facilities. Designs suitable for proposals such as the Japanese Energy-Selective Intense Neutron Source, and the international Fusion Materials Irradiation Facility are discussed

  16. Future aircraft networks and schedules

    Science.gov (United States)

    Shu, Yan

    2011-07-01

    Because of the importance of air transportation scheduling, the emergence of small aircraft and the vision of future fuel-efficient aircraft, this thesis has focused on the study of aircraft scheduling and network design involving multiple types of aircraft and flight services. It develops models and solution algorithms for the schedule design problem and analyzes the computational results. First, based on the current development of small aircraft and on-demand flight services, this thesis expands a business model for integrating on-demand flight services with the traditional scheduled flight services. This thesis proposes a three-step approach to the design of aircraft schedules and networks from scratch under the model. In the first step, both a frequency assignment model for scheduled flights that incorporates a passenger path choice model and a frequency assignment model for on-demand flights that incorporates a passenger mode choice model are created. In the second step, a rough fleet assignment model that determines a set of flight legs, each of which is assigned an aircraft type and a rough departure time is constructed. In the third step, a timetable model that determines an exact departure time for each flight leg is developed. Based on the models proposed in the three steps, this thesis creates schedule design instances that involve almost all the major airports and markets in the United States. The instances of the frequency assignment model created in this thesis are large-scale non-convex mixed-integer programming problems, and this dissertation develops an overall network structure and proposes iterative algorithms for solving these instances. The instances of both the rough fleet assignment model and the timetable model created in this thesis are large-scale mixed-integer programming problems, and this dissertation develops subproblem schemes for solving these instances. Based on these solution algorithms, this dissertation also presents

  17. Development of heavy ion linear accelerators

    International Nuclear Information System (INIS)

    Bomko, V.A.; Khizhnyak, N.A.

    1981-01-01

    A review of the known heavy ion accelerators is given. It is stated that cyclic and linear accelerators are the most perspective ones in the energy range up to 10 MeV/nucleon according to universality in respect with the possibility of ion acceleration of the wide mass range. However, according to the accelerated beam intensity of the heavier ions the linear accelerators have considerable advantages over any other types of accelerators. The review of the known heavy ion linac structures permits to make the conclusion that a new modification of an accelerating structure of opposite pins excited on a H-wave is the most perspective one [ru

  18. Development of the warm snake and acceleration of polarized protons

    International Nuclear Information System (INIS)

    Takano, Junpei

    2007-01-01

    Acceleration of polarized protons is one of interesting issues of the high energy and accelerator physics. As known as the proton spin crisis, the total of the quark spin is not equal to the proton spin. To explore sources of the proton spin, it has been required to accelerate polarized protons to higher energy as hundreds GeV with higher polarization. However it is difficult to accelerate the polarized protons to higher energy with preserving higher polarization by using circular accelerators since the polarized beam crosses several types of depolarizing resonances. To overcome the depolarizing resonances, unique components are employed to the accelerator chain at the Brookhaven National Laboratory (BNL). On this description, developing a normal conducting helical dipole partial Siberian snake is explained in detail. As the results of upgrading the accelerators, the polarization has been increased recently. (author)

  19. Utilization of accelerators for development of polymer materials

    International Nuclear Information System (INIS)

    Omichi, Hideki

    1987-01-01

    There are two processes in the development of polymer materials using accelerators. One is to induce graft polymerization by irradiating the electron beam of high dose rate, and another is to induce cross-linking or decomposition by irradiating on existing polymer materials. The former is mostly at the stage of research and development, while in the latter, the industrial utilization has advanced as bridged electric wires, foaming materials and thermal contraction materials. In this paper, the results of the basic research are mainly reported. The polymerization of vinyl monomers such as styrene easily advances by the irradiation of gamma ray or electron beam, accordingly, it is widely utilized as the object of basic research. When the plural radicals produced by the irradiation of polymers couple mutually or attach to double bonds, the polymer of large molecular weight arises, on the other hand, when radicals arise by the severance of main chains in polymers, the molecular weight decreases. The utilization of accelerators for the development of polymer materials is diversified. Hereafter, also particle accelerators will be used for this field. Already ion implantation, sputtering, hole-opening and so on for polymer materials began to be studied, and the new development of materials is expected. (Kako, I.)

  20. Advanced Test Accelerator (ATA) pulse power technology development

    International Nuclear Information System (INIS)

    Reginato, L.L.; Branum, D.; Cook, E.

    1981-01-01

    The Advanced Test Accelerator (ATA) is a pulsed linear induction accelerator with the following design parameters: 50 MeV, 10 kA, 70 ns, and 1 kHz in a ten-pulse burst. Acceleration is accomplished by means of 190 ferrite-loaded cells, each capable of maintaining a 250 kV voltage pulse for 70 ns across a 1-inch gap. The unique characteristic of this machine is its 1 kHz burst mode capability at very high currents. This paper dscribes the pulse power development program which used the Experimental Test Accelerator (ETA) technology as a starting base. Considerable changes have been made both electrically and mechanically in the pulse power components with special consideration being given to the design to achieve higher reliability. A prototype module which incorporates all the pulse power components has been built and tested for millions of shots. Prototype components and test results are described

  1. Hybrid glowworm swarm optimization for task scheduling in the cloud environment

    Science.gov (United States)

    Zhou, Jing; Dong, Shoubin

    2018-06-01

    In recent years many heuristic algorithms have been proposed to solve task scheduling problems in the cloud environment owing to their optimization capability. This article proposes a hybrid glowworm swarm optimization (HGSO) based on glowworm swarm optimization (GSO), which uses a technique of evolutionary computation, a strategy of quantum behaviour based on the principle of neighbourhood, offspring production and random walk, to achieve more efficient scheduling with reasonable scheduling costs. The proposed HGSO reduces the redundant computation and the dependence on the initialization of GSO, accelerates the convergence and more easily escapes from local optima. The conducted experiments and statistical analysis showed that in most cases the proposed HGSO algorithm outperformed previous heuristic algorithms to deal with independent tasks.

  2. Recent activities in accelerator code development

    International Nuclear Information System (INIS)

    Copper, R.K.; Ryne, R.D.

    1992-01-01

    In this paper we will review recent activities in the area of code development as it affects the accelerator community. We will first discuss the changing computing environment. We will review how the computing environment has changed in the last 10 years, with emphasis on computing power, operating systems, computer languages, graphics standards, and massively parallel processing. Then we will discuss recent code development activities in the areas of electromagnetics codes and beam dynamics codes

  3. Status of accelerator development at Fermilab

    International Nuclear Information System (INIS)

    Owen, C.W.

    1976-01-01

    The Fermilab accelerator is comprised of four major systems: the high-energy beam-extraction and switching system, the main accelerator (main ring), the booster, and the linear accelerator. The Fermilab accelerator produces accelerated beams for a vigorous international high-energy physics program. The basic design features and operation for high-energy physics have been described a number of times in the past. A report is given which, for the most part, discusses in detail only those features that are particularly significant in increasing the usefulness of the accelerator as a tool for high-energy physics

  4. Effective Schedule and Cost Management as a Product Development Lead

    Science.gov (United States)

    Simmons, Cynthia

    2015-01-01

    The presentation will be given at the 26th Annual Thermal Fluids Analysis Workshop (TFAWS 2015) hosted by the Goddard SpaceFlight Center (GSFC) Thermal Engineering Branch (Code 545). This course provides best practices, helpful tools and lessons learned for staying on plan and day-to-day management of Subsystem flight development after getting Project approval for your Subsystem schedule and budget baseline.

  5. Development of ADS virtual accelerator based on XAL

    International Nuclear Information System (INIS)

    Wang Pengfei; Cao Jianshe; Ye Qiang

    2014-01-01

    XAL is a high level accelerator application framework that was originally developed by the Spallation Neutron Source (SNS), Oak Ridge National Laboratory. It has an advanced design concept and has been adopted by many international accelerator laboratories. Adopting XAL for ADS is a key subject in the long term. This paper will present the modifications to the original XAL applications for ADS. The work includes a proper relational database schema modification in order to better suit the requirements of ADS configuration data, redesigning and re-implementing db2xal application, and modifying the virtual accelerator application. In addition, the new device types and new device attributes for ADS online modeling purpose are also described here. (authors)

  6. Development of electron linear accelerators in SAMEER

    International Nuclear Information System (INIS)

    Krishnan, R.

    2015-01-01

    LINear Accelerator (LINAC) based Radiotherapy machine is a key tool for Cancer Treatment. The number of such linac machines available is far less than the actual requirement projected, to suffice the needs of the vast number of Cancer Patients in the country. Development of indigenous state-of-art cancer therapy machine was therefore a crucial achievement under the Jai Vigyan Project of Govt. of India. With the support of Department of Electronics and Information Technology (DeitY), Govt of India, SAMEER has successfully developed 6 MV Radiation Oncology machine at par international standards and is being used to treat cancer patients in the country. SAMEER is also currently developing the dual photon energy and multiple electron energy medical linac machine for radiotherapy and also critical accessories to make a complete oncology system required for advanced state of art treatment. In this paper the work in SAMEER on electron linear accelerators for the medical applications and the related technology and facilities available will be presented. (author)

  7. NASA Instrument Cost/Schedule Model

    Science.gov (United States)

    Habib-Agahi, Hamid; Mrozinski, Joe; Fox, George

    2011-01-01

    NASA's Office of Independent Program and Cost Evaluation (IPCE) has established a number of initiatives to improve its cost and schedule estimating capabilities. 12One of these initiatives has resulted in the JPL developed NASA Instrument Cost Model. NICM is a cost and schedule estimator that contains: A system level cost estimation tool; a subsystem level cost estimation tool; a database of cost and technical parameters of over 140 previously flown remote sensing and in-situ instruments; a schedule estimator; a set of rules to estimate cost and schedule by life cycle phases (B/C/D); and a novel tool for developing joint probability distributions for cost and schedule risk (Joint Confidence Level (JCL)). This paper describes the development and use of NICM, including the data normalization processes, data mining methods (cluster analysis, principal components analysis, regression analysis and bootstrap cross validation), the estimating equations themselves and a demonstration of the NICM tool suite.

  8. Status Report on the accelerators operation

    International Nuclear Information System (INIS)

    Biri, S.; Kormany, Z.; Berzi, I.; Racz, R.; Perduk, Z.; Vajda, I.

    2012-01-01

    In 2012 our particle accelerators operated as scheduled, safely and without major or long breakdowns. The utilization rates of the accelerators slightly increased in comparing to the preceding year (see Fig. 1). The cyclotron delivered 1900 hours and the 40-years old 5 MeV Van de Graaff generator supplied more than 2400 hours. The 1 MeV Van de Graaff accelerator was also operated for short basic physics experiments (160 hours). The plasma and beam on-target time at the ECR ion source was similar to the preceding years (410 hours). The isotope separator, as ion beam accelerator was utilized only for a few hours in 2012, since the research and development in this lab focused on other fields. Nevertheless it is continuously available for research requiring special deposition techniques and for isotope tracing studies. We developed the first version of an on-line accelerator status display software. Through our homepage anybody from anywhere can now check the current state of the cyclotron, VdG-5 and ECRIS accelerators. While in 2010 the cyclotron celebrated the 25 th anniversary of its regular starting-up, in 2012 two of our other accelerators had also anniversary. The ECR Ion Source project started 20 years ago, in 1992. To celebrate it, a scientific symposium was hold in September. In the symposium - beyond the high number of audience - the leaders of the Hungarian Academy of Sciences, the University of Debrecen and the City of Debrecen attended, as well. The local and national press reported about the event in many form. A short summary of the symposium is in our homepage (in Hungarian). We had the 40 th anniversary of the regular use of the 5 MeV Van de Graaff accelerator. Having obtained the final approval of the project the 'Electrostatic Accelerator Department' was organized in the Institute in July 1967 with the tasks to perform the planning and construction of the laboratory, to make all the preparations necessary for the intensive scientific use of the

  9. Architecture and Civil Design Status of the Proton Accelerator Research Center in PEFP

    International Nuclear Information System (INIS)

    Nam, J. M.; Kim, J. Y.; Mun, K. J.; Jeon, G. P.; Cho, J. S.; Lee, S. K.; Min, Y. S.; Joo, H. G.

    2009-01-01

    PEFP (Proton Engineering Frontier Project) is scheduled to administrate the conventional facilities design with Gyeongju and complement its unfit points. When construction work starts according to the construction schedule, a field work office will be installed to supervise the Proton Accelerator Conventional Facilities Construction. In this paper, we describe the geological investigation procedure for the construction of the proton accelerator conventional facilities of PEFP. By the geological investigation, data for the reasonable and economic construction work, such as stratum structure and geotechnical characteristics. In Site Plot Plan for PEFP, we classified center as 2 groups such as main facilities and support facilities. We also designed access road of the Proton Accelerator Research Center of PEFP. In architectural design for PEFP, we described the design procedure of the buildings and landscape architectures of the Proton Accelerator Research Center

  10. Design and development of R.F. LINAC accelerator components

    International Nuclear Information System (INIS)

    Abhay Kumar; Guha, S.; Balasubramaniam, R.; Jawale, S.B.

    2003-01-01

    Full text: Radio frequency linear accelerator, a high power electron LINAC technology, is being developed at BARC. These accelerators are considered to be the most compact and effective for a given power capacity. Important application areas of this LINAC include medical sterilization, food preservation, pollution control, semiconductor industries, radiation therapy and material science. Center for Design and Manufacture (CDM), BARC has been entrusted with the design, development and manufacturing of various mechanical components of the accelerator. Most critical and precision components out of them are Diagnostic chamber, Faraday cup, Drift tube and R.F. cavities. This paper deals with the design aspects in respect of Ultra high vacuum compatibility and the mechanism of operation. Also this paper discusses the state-of-art technology for machining of intricate contour using specially designed poly crystalline diamond tool and the inspection methodology developed to minimize the measurement errors on the machined contour. Silver brazing technique employed to join the LINAC cavities is also described in detail

  11. Performance review of thermionic electron gun developed for RF linear accelerators at RRCAT

    International Nuclear Information System (INIS)

    Wanmode, Yashwant; Mulchandani, J.; Reddy, T.S.; Bhisikar, A.; Singh, H.G.; Shrivastava, Purushottam

    2015-01-01

    RRCAT is engaged in development of RF electron linear accelerator for irradiation of industrial and agricultural products. Thermionic electron gun is primary source for this accelerator as beam current in the RF accelerator is modest and thermionic emission is most prevalent option for electron gun development. An electron gun has to meet high cathode emission capability, low filament power, good accessibility for cathode replacement and should provide short time for maintenance. Electron linear accelerator up to beam energy of 10 MeV require electron source of 45-50 keV beam energy and emission current of 1 A. Electron optics of gun and electron beam profile simulations were carried out using CST's particle tracking code and EGUN code. Triode type electron gun of cathode voltage 50 kV pulsed has been designed, developed and integrated with 10 MeV electron linear accelerators at RRCAT. Beam current of more than 600 mA has been measured with faraday cup in the test stand developed for characterizing the electron gun. Two accelerators one is imported and another one developed indigenously has been energized using this electron gun. Beam energy of 5-10 MeV has been achieved with beam current of 250-400 mA by integrating this electron gun with the linear accelerator. This paper reviews the performance of indigenously developed electron gun for both linear accelerators. (author)

  12. Physics and technical development of accelerators; Physique et technique des accelerateurs

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    About 90 registered participants delivered more than 40 scientific papers. A great part of these presentations were of general interest about running projects such as CIME accelerator at Ganil, IPHI (high intensity proton injector), ESRF (European source of synchrotron radiation), LHC (large hadron collider), ELYSE accelerator at Orsay, AIRIX, and VIVITRON tandem accelerator. Other presentations highlighted the latest technological developments of accelerator components: superconducting cavities, power klystrons, high current injectors..

  13. Accelerator development for medical applications

    International Nuclear Information System (INIS)

    Tanabe, Eiji

    2007-01-01

    Electron linear accelerators have been widely used in medical applications, especially in radiation therapy for cancer treatment. There are more than 7,000 medical electron linear accelerators in the world, treating over 250,000 patients per day. This paper reviews the current status of accelerator applications and technologies in radiation therapy, and presents the anticipated requirements for advanced radiation therapy technology in the foreseeable future. (author)

  14. Analyzing scheduling in the food-processing industry

    DEFF Research Database (Denmark)

    Akkerman, Renzo; van Donk, Dirk Pieter

    2009-01-01

    Production scheduling has been widely studied in several research areas, resulting in a large number of methods, prescriptions, and approaches. However, the impact on scheduling practice seems relatively low. This is also the case in the food-processing industry, where industry......-specific characteristics induce specific and complex scheduling problems. Based on ideas about decomposition of the scheduling task and the production process, we develop an analysis methodology for scheduling problems in food processing. This combines an analysis of structural (technological) elements of the production...... process with an analysis of the tasks of the scheduler. This helps to understand, describe, and structure scheduling problems in food processing, and forms a basis for improving scheduling and applying methods developed in literature. It also helps in evaluating the organisational structures...

  15. Phase I/II Study Evaluating Early Tolerance in Breast Cancer Patients Undergoing Accelerated Partial Breast Irradiation Treated With the MammoSite Balloon Breast Brachytherapy Catheter Using a 2-Day Dose Schedule

    International Nuclear Information System (INIS)

    Wallace, Michelle; Martinez, Alvaro; Mitchell, Christina; Chen, Peter Y.; Ghilezan, Mihai; Benitez, Pamela; Brown, Eric; Vicini, Frank

    2010-01-01

    Purpose: Initial Phase I/II results using balloon brachytherapy to deliver accelerated partial breast irradiation (APBI) in 2 days in patients with early-stage breast cancer are presented. Materials and Methods: Between March 2004 and August 2007, 45 patients received adjuvant radiation therapy after lumpectomy with balloon brachytherapy in a Phase I/II trial delivering 2800 cGy in four fractions of 700 cGy. Toxicities were evaluated using the National Cancer Institute Common Toxicity Criteria for Adverse Events v3.0 scale and cosmesis was documented at ≥6 months. Results: The median age was 66 years (range, 48-83) and median skin spacing was 12 mm (range, 8-24). The median follow-up was 11.4 months (5.4-48 months) with 21 patients (47%) followed ≥1 year, 11 (24%) ≥2 years, and 7 (16%) ≥3 years. At <6 months (n = 45), Grade II toxicity rates were 9% radiation dermatitis, 13% breast pain, 2% edema, and 2% hyperpigmentation. Grade III breast pain was reported in 13% (n = 6). At ≥6 months (n = 43), Grade II toxicity rates were: 2% radiation dermatitis, 2% induration, and 2% hypopigmentation. Grade III breast pain was reported in 2%. Infection was 13% (n = 6) at <6 months and 5% (n = 2) at ≥6 months. Persistent seroma ≥6 months was 30% (n = 13). Fat necrosis developed in 4 cases (2 symptomatic). Rib fractures were seen in 4% (n = 2). Cosmesis was good/excellent in 96% of cases. Conclusions: Treatment with balloon brachytherapy using a 2-day dose schedule resulted acceptable rates of Grade II/III chronic toxicity rates and similar cosmetic results observed with a standard 5-day accelerated partial breast irradiation schedule.

  16. Constraint-based scheduling applying constraint programming to scheduling problems

    CERN Document Server

    Baptiste, Philippe; Nuijten, Wim

    2001-01-01

    Constraint Programming is a problem-solving paradigm that establishes a clear distinction between two pivotal aspects of a problem: (1) a precise definition of the constraints that define the problem to be solved and (2) the algorithms and heuristics enabling the selection of decisions to solve the problem. It is because of these capabilities that Constraint Programming is increasingly being employed as a problem-solving tool to solve scheduling problems. Hence the development of Constraint-Based Scheduling as a field of study. The aim of this book is to provide an overview of the most widely used Constraint-Based Scheduling techniques. Following the principles of Constraint Programming, the book consists of three distinct parts: The first chapter introduces the basic principles of Constraint Programming and provides a model of the constraints that are the most often encountered in scheduling problems. Chapters 2, 3, 4, and 5 are focused on the propagation of resource constraints, which usually are responsibl...

  17. Canadian accelerator breeder system development

    International Nuclear Information System (INIS)

    Schriber, S.O.

    1982-11-01

    A shortage of fissile material at a reasonable price is expected to occur in the early part of the twenty-first century. Converting fertile material to fissile material by electronuclar methods is an option that can extend th world's resources of fissionable material, supplying fuel for nuclear power stations. This paper presents the rationale for electronuclear breeders and describes the Canadian development program for an accelerator breeder facility that could produce 1 Mg of fissile material per year

  18. Development of 750 keV/20kW DC accelerator

    International Nuclear Information System (INIS)

    Bapna, S.C.; Banwari, R.; Venkateswaran, S.V.; Tripathi, Alok; Kasliwal, Apollo; Pramod, R.; Kumar, Pankaj

    2001-01-01

    This paper discusses development of a DC accelerator at CAT for industrial applications. This accelerator is housed in two floors; first floor having the accelerator and the ground floor is an irradiation cell. It will operate in the voltage range of 300kV to 750kV and will give maximum beam power of 20kW. The electron gun, acceleration column, focusing coil, high voltage multiplier stack, filament power supply and the control unit are housed in a 1.5 m diameter 3.2 m high pressure vessel which will be pressurized to 5.5 bar of SF 6 gas

  19. Development of new electron beam accelerator

    International Nuclear Information System (INIS)

    Tanaka, Jiro

    1976-01-01

    Approximately two decades have elapsed since electron accelerators were first employed in industry. It is widely used in the fields of chemical and food industries and the prevention of pollution. The accelerators for industrial use are limited to those obtainable high current or high output, low cost and easy handling. The low energy (up to 2 or 3 MeV) accelerators applicable to industry include the rectification type (Cockcroft, Dynamitron, Van de Graaff etc.), the AC transformer type (resonance transformer, cascade transformer) and the transformer type. As the accelerators of higher energy (more than 3 MeV), there exist the linear accelerator and the electromagnetic induction type. The linear accelerators are widely employed for industrial and medical uses as the large output can be obtained. Though various types of accelerators are used in industry, more increasing demands in accordance with the diversification of application are not always satisfied. As it seems that the realization of a new accelerator of improved performance and cost requires long time, it may be important to perform the standardization by dividing the energy and output ranges. (Wakatsuki, Y.)

  20. Constraint-based scheduling

    Science.gov (United States)

    Zweben, Monte

    1993-01-01

    The GERRY scheduling system developed by NASA Ames with assistance from the Lockheed Space Operations Company, and the Lockheed Artificial Intelligence Center, uses a method called constraint-based iterative repair. Using this technique, one encodes both hard rules and preference criteria into data structures called constraints. GERRY repeatedly attempts to improve schedules by seeking repairs for violated constraints. The system provides a general scheduling framework which is being tested on two NASA applications. The larger of the two is the Space Shuttle Ground Processing problem which entails the scheduling of all the inspection, repair, and maintenance tasks required to prepare the orbiter for flight. The other application involves power allocation for the NASA Ames wind tunnels. Here the system will be used to schedule wind tunnel tests with the goal of minimizing power costs. In this paper, we describe the GERRY system and its application to the Space Shuttle problem. We also speculate as to how the system would be used for manufacturing, transportation, and military problems.

  1. Schedule-Aware Workflow Management Systems

    Science.gov (United States)

    Mans, Ronny S.; Russell, Nick C.; van der Aalst, Wil M. P.; Moleman, Arnold J.; Bakker, Piet J. M.

    Contemporary workflow management systems offer work-items to users through specific work-lists. Users select the work-items they will perform without having a specific schedule in mind. However, in many environments work needs to be scheduled and performed at particular times. For example, in hospitals many work-items are linked to appointments, e.g., a doctor cannot perform surgery without reserving an operating theater and making sure that the patient is present. One of the problems when applying workflow technology in such domains is the lack of calendar-based scheduling support. In this paper, we present an approach that supports the seamless integration of unscheduled (flow) and scheduled (schedule) tasks. Using CPN Tools we have developed a specification and simulation model for schedule-aware workflow management systems. Based on this a system has been realized that uses YAWL, Microsoft Exchange Server 2007, Outlook, and a dedicated scheduling service. The approach is illustrated using a real-life case study at the AMC hospital in the Netherlands. In addition, we elaborate on the experiences obtained when developing and implementing a system of this scale using formal techniques.

  2. Current Outlook for 99mTc Distribution Based on Electron Accelerator Production

    International Nuclear Information System (INIS)

    Benjamin L. Nelson; W. David Bence; John R. Snyder

    2007-01-01

    In 1999 a practical example illustrating the economical and reliable production of 99mTc from an accelerator was developed. It included the realistic costs involved in establishing and operating the accelerator facility and the distribution of the 99mTc to regions in Florida. However, the technology was never commercialized. Recent political and economic developments prompted this second look at accelerator produced 99mTc. The practicality of this system in 2007 dollars was established to account for inflation and current demand. The same distribution model and production schedule from the Global 1999 study were used. Numbers were found using current rates and costs where possible and indexed estimations when necessary. Though several of the costs increased significantly and the sale price remains at approximately 35 cents/mCi, the unit cost of 99mTc throughput only increased from 12.8 cents/mCi to 15.0 cents/mCi or approximately 17.2% from 1999 to 2007 thus continuing to be economically viable. This study provides ground work for creating business development models at additional locations within the U.S

  3. The algorithm for duration acceleration of repetitive projects considering the learning effect

    Science.gov (United States)

    Chen, Hongtao; Wang, Keke; Du, Yang; Wang, Liwan

    2018-03-01

    Repetitive project optimization problem is common in project scheduling. Repetitive Scheduling Method (RSM) has many irreplaceable advantages in the field of repetitive projects. As the same or similar work is repeated, the proficiency of workers will be correspondingly low to high, and workers will gain experience and improve the efficiency of operations. This is learning effect. Learning effect is one of the important factors affecting the optimization results in repetitive project scheduling. This paper analyzes the influence of the learning effect on the controlling path in RSM from two aspects: one is that the learning effect changes the controlling path, the other is that the learning effect doesn't change the controlling path. This paper proposes corresponding methods to accelerate duration for different types of critical activities and proposes the algorithm for duration acceleration based on the learning effect in RSM. And the paper chooses graphical method to identity activities' types and considers the impacts of the learning effect on duration. The method meets the requirement of duration while ensuring the lowest acceleration cost. A concrete bridge construction project is given to verify the effectiveness of the method. The results of this study will help project managers understand the impacts of the learning effect on repetitive projects, and use the learning effect to optimize project scheduling.

  4. Development of wide area environment accelerator operation and diagnostics method

    Science.gov (United States)

    Uchiyama, Akito; Furukawa, Kazuro

    2015-08-01

    Remote operation and diagnostic systems for particle accelerators have been developed for beam operation and maintenance in various situations. Even though fully remote experiments are not necessary, the remote diagnosis and maintenance of the accelerator is required. Considering remote-operation operator interfaces (OPIs), the use of standard protocols such as the hypertext transfer protocol (HTTP) is advantageous, because system-dependent protocols are unnecessary between the remote client and the on-site server. Here, we have developed a client system based on WebSocket, which is a new protocol provided by the Internet Engineering Task Force for Web-based systems, as a next-generation Web-based OPI using the Experimental Physics and Industrial Control System Channel Access protocol. As a result of this implementation, WebSocket-based client systems have become available for remote operation. Also, as regards practical application, the remote operation of an accelerator via a wide area network (WAN) faces a number of challenges, e.g., the accelerator has both experimental device and radiation generator characteristics. Any error in remote control system operation could result in an immediate breakdown. Therefore, we propose the implementation of an operator intervention system for remote accelerator diagnostics and support that can obviate any differences between the local control room and remote locations. Here, remote-operation Web-based OPIs, which resolve security issues, are developed.

  5. Development of wide area environment accelerator operation and diagnostics method

    Directory of Open Access Journals (Sweden)

    Akito Uchiyama

    2015-08-01

    Full Text Available Remote operation and diagnostic systems for particle accelerators have been developed for beam operation and maintenance in various situations. Even though fully remote experiments are not necessary, the remote diagnosis and maintenance of the accelerator is required. Considering remote-operation operator interfaces (OPIs, the use of standard protocols such as the hypertext transfer protocol (HTTP is advantageous, because system-dependent protocols are unnecessary between the remote client and the on-site server. Here, we have developed a client system based on WebSocket, which is a new protocol provided by the Internet Engineering Task Force for Web-based systems, as a next-generation Web-based OPI using the Experimental Physics and Industrial Control System Channel Access protocol. As a result of this implementation, WebSocket-based client systems have become available for remote operation. Also, as regards practical application, the remote operation of an accelerator via a wide area network (WAN faces a number of challenges, e.g., the accelerator has both experimental device and radiation generator characteristics. Any error in remote control system operation could result in an immediate breakdown. Therefore, we propose the implementation of an operator intervention system for remote accelerator diagnostics and support that can obviate any differences between the local control room and remote locations. Here, remote-operation Web-based OPIs, which resolve security issues, are developed.

  6. Scientists at Brookhaven contribute to the development of a better electron accelerator

    CERN Multimedia

    2004-01-01

    Scientists working at Brookhaven have developed a compact linear accelerator called STELLA (Staged Electron Laser Acceleration). Highly efficient, it may help electron accelerators become practical tools for applications in industry and medicine, such as radiation therapy (1 page)

  7. Latest Development in Superconducting RF Structures for beta=1 Particle Acceleration

    International Nuclear Information System (INIS)

    Peter Kneisel

    2006-01-01

    Superconducting RF technology is since nearly a decade routinely applied to different kinds of accelerating devices: linear accelerators, storage rings, synchrotron light sources and FEL's. With the technology recommendation for the International Linear Collider (ILC) a year ago, new emphasis has been placed on improving the performance of accelerating cavities both in Q-value and in accelerating gradients with the goal to achieve performance levels close to the fundamental limits given by the material parameters of the choice material, niobium. This paper will summarize the challenges to SRF technology and will review the latest developments in superconducting structure design. Additionally, it will give an overview of the newest results and will report on the developments in alternative materials and technologies

  8. Adaptive Gain Scheduled Semiactive Vibration Control Using a Neural Network

    Directory of Open Access Journals (Sweden)

    Kazuhiko Hiramoto

    2018-01-01

    Full Text Available We propose an adaptive gain scheduled semiactive control method using an artificial neural network for structural systems subject to earthquake disturbance. In order to design a semiactive control system with high control performance against earthquakes with different time and/or frequency properties, multiple semiactive control laws with high performance for each of multiple earthquake disturbances are scheduled with an adaptive manner. Each semiactive control law to be scheduled is designed based on the output emulation approach that has been proposed by the authors. As the adaptive gain scheduling mechanism, we introduce an artificial neural network (ANN. Input signals of the ANN are the measured earthquake disturbance itself, for example, the acceleration, velocity, and displacement. The output of the ANN is the parameter for the scheduling of multiple semiactive control laws each of which has been optimized for a single disturbance. Parameters such as weight and bias in the ANN are optimized by the genetic algorithm (GA. The proposed design method is applied to semiactive control design of a base-isolated building with a semiactive damper. With simulation study, the proposed adaptive gain scheduling method realizes control performance exceeding single semiactive control optimizing the average of the control performance subject to various earthquake disturbances.

  9. Status of the Oak Ridge 25 URC accelerator

    International Nuclear Information System (INIS)

    Ziegler, N.F.; Richardson, E.G.; Mills, G.D.

    1985-01-01

    The tandem accelerator achieved 3900 hours of a beam available for research.'' This amounts to a 23% increase in research time over the previous year. This was achieved despite 15 tank openings, 13 of which were unscheduled. The highest terminal voltage for a regularly scheduled experiment was 21.5 MV, an increase of 1.2 MV over the previous year. An arc discharge conditioning test was conducted on the top five units of the accelerator and a test of the accelerator with macropulsed beam was accomplished. Operating experience with the tandem accelerator over the past year is summarized. New ion species provided for research include 1 H, 7 Li, 40 Ca, 13 C, 52 Cr, 90 Zr, 93 Nb, and 238 U. Additions and modifications to the tandem accelerator are reported

  10. Accelerator development in India for ADS programme

    Indian Academy of Sciences (India)

    Nuclear Physics Division, Bhabha Atomic Research Centre, Mumbai 400 085, India. *Physics ... At BARC, development of a Low Energy High Intensity Proton Accelerator. (LEHIPA) ... incinerate the MA (minor actinides) and LLFP (long-lived fission products) ra- diotoxic .... figure 3 to satisfy the required boundary conditions.

  11. DOE pursuing accelerated cleanup at Fernald

    International Nuclear Information System (INIS)

    Borgman, T.

    1996-01-01

    The timing is right, and officials at Fernald are ready to initiate final cleanup actions-at an accelerated pace. open-quotes We have a viable, aggressive plan in place that will reduce the risks associated with the site by accelerating the cleanup schedule, and save a lot of time and money in the process,close quotes said Don Ofte, president of the Fernald Environmental Restoration management Corporation (FERMCO). Ofte is referring to the accelerated cleanup plan that the U.S. Department of Energy has approved to complete the remediation of Fernald in approximately 10 years-instead of 25-30 years-at a cost savings to taxpayers of almost $3 billion. This article describes the scenario at Fernald and politically which has lead to this decision

  12. Development of small applied accelerator in Tokyo Institute of Technology

    CERN Document Server

    Hattori, T

    2002-01-01

    Interdigital-H(IH) Linac was constructed and applied to materials research in the University. IH Linac uses 1.6 MV small tandem pelletron and accelerates ion (>Q/A=1/4) from 240 KeV to 2.4 MeV. The secondary IH Linac was built and increased the energy to 3.4 MeV/u. In order to apply linac to therapy, IH Linac for PET (Position Emission Tomography), Carbon 6 MeV/u Linac for cancer therapy, APF (Alternating Phase Focus)-IH prototype linac, Carbon 2 MeV/u test APF-IH linac were developed. On application to semiconductor and industry, IHQ type MeV ion implantation device, APF-IH type MeV ion implantation device and high-energy electron accelerator were developed. A bone density measurement instrument was developed and the data was proved better values than ordinary instrument. The problems of prototype small accelerator are summarized. (S.Y.)

  13. Report on the Workshop on Accelerated Nuclear Energy Materials Development

    Energy Technology Data Exchange (ETDEWEB)

    King, Wayne E. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Allen, Todd [Univ. of Wisconsin, Madison, WI (United States); Arsenlis, Tom [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Bench, Graham [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Bulatov, Vasily [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Fluss, Michael [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Klein, Richard [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); McMahon, Donn [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Middleton, Carolin [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Morley, Maureen [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Pasamehmetoglu, Kemal [Idaho National Lab. (INL), Idaho Falls, ID (United States); Turchi, Patrice [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Was, Gary [Univ. of Michigan, Ann Arbor, MI (United States)

    2010-05-11

    This document reports on the Office of Nuclear Energy’s (NE’s) Workshop on Accelerated Nuclear Energy Materials Development held May 11, 2010, in Washington, DC. The purpose of the workshop was twofold: (1) to provide feedback on an initiative to use uncertainty quantification (UQ) to integrate theory, simulation, and modeling with accelerated experimentation to predict the behavior of materials and fuels in an irradiation environment and thereby accelerate the lengthy materials design and qualification process; and (2) to provide feedback on and refinement to five topical areas to develop predictive models for fuels and cladding and new radiation-tolerant materials. The goal of the workshop was to gather technical feedback with respect to the Office of Nuclear Energy’s research and development while also identifying and highlighting crosscutting capability and applicability of the initiative to other federal offices, including the Department of Energy’s (DOE’s) National Nuclear Security Administration (NNSA), Nuclear Regulatory Commission (NRC), DOE Office of Basic Energy Sciences (BES), DOE Office of Fusion Energy Sciences (FES), and Naval Reactors. The goals of the initiative are twofold: (1) develop time- and length-scale transcending models that predict material properties using UQ to effectively integrate theory, simulation, and modeling with accelerated experiments; and (2) design and develop new radiation-tolerant materials using the knowledge gained and methodologies created to shorten the development and qualification time and reduce cost. The initiative is crosscutting and has synergy with industry and other federal offices including Naval Reactors, NRC, FES, BES, and the Office of Advanced Scientific Computing Research (ASCR). It is distinguished by its use of uncertainty quantification to effectively integrate theory, simulation, and modeling with high-dose experimental capabilities. The initiative aims to bring the methodology that is being

  14. Linear Accelerator Development for Cancer Treatment at SLRI

    International Nuclear Information System (INIS)

    Juntong, N.

    2014-01-01

    Linear accelerator (linac) technology has been widely utilised for cancer treatment in hospital. This linac utilised an accelerated electron beam to create x-ray beam for radiotherapy. At Synchrotron Light Research Institute (SLRI), the idea to fabricate the prototype of medical linac with low cost for domestic use in Thailand was proposed and the budget has been granted. There are three objectives of this proposal: 1) to develop prototype of medical linac by the ability of domestic people for reducing the machine import and maintenance costs,2) to encourage researching in science and technology concerning medical application for the practical use products, and 3) to develop knowledge and expertise in accelerator and concerning technologies of medical linac. In the first phase, the electron beam energy of the prototype machine will be 6 MeV or equivalent to x-ray energy of 6 MV based on discussions with several hospitals in the country. This energy level is considered suitable for the Thais due to shapes and sizes of the bodies. A brief introduction of background, objectives, and scope of the project will be presented together with the project timeline. Progression of project activities will also be discussed.

  15. History and Technology Developments of Radio Frequency (RF) Systems for Particle Accelerators

    Science.gov (United States)

    Nassiri, A.; Chase, B.; Craievich, P.; Fabris, A.; Frischholz, H.; Jacob, J.; Jensen, E.; Jensen, M.; Kustom, R.; Pasquinelli, R.

    2016-04-01

    This article attempts to give a historical account and review of technological developments and innovations in radio frequency (RF) systems for particle accelerators. The evolution from electrostatic field to the use of RF voltage suggested by R. Wideröe made it possible to overcome the shortcomings of electrostatic accelerators, which limited the maximum achievable electric field due to voltage breakdown. After an introduction, we will provide reviews of technological developments of RF systems for particle accelerators.

  16. Development of repetitive railgun pellet accelerator and steady-state solid hydrogen extruder

    International Nuclear Information System (INIS)

    Oda, Y.; Azuma, K.; Onozuka, M.; Kasai, S.; Hasegawa, K.

    1995-01-01

    Development of a railgun pellet accelerator and a steady-state solid hydrogen extruder has been conducted. A railgun accelerator has been investigated for a high-speed repetitive pellet acceleration. The final objective is to develop a railgun system that can achieve a 5km/s speed-class repetitive (2Hz) pellet injection. Improvement in the acceleration efficiency showed a pellet velocity of more than 2km/s using augment rails and a ceramic insulator applied to a 1m-long railgun. The other investigation focused on the development of a steady-state solid hydrogen extruder for continuous pellet injection. Screw-driven extruding system has been chosen to extrude the solid hydrogen filament continuously. Theoretical considerations suggest that temperature control of the system is important in future research. (orig.)

  17. Development of repetitive railgun pellet accelerator and steady-state solid hydrogen extruder

    Energy Technology Data Exchange (ETDEWEB)

    Oda, Y. [Mitsubishi Heavy Industries Ltd., Kobe (Japan); Azuma, K. [Mitsubishi Heavy Industries Ltd., Kobe (Japan); Onozuka, M. [Mitsubishi Heavy Industries Ltd., Kobe (Japan); Kasai, S. [Japan Atomic Energy Research Inst., Ibaraki (Japan); Hasegawa, K. [Japan Atomic Energy Research Inst., Ibaraki (Japan)

    1995-12-31

    Development of a railgun pellet accelerator and a steady-state solid hydrogen extruder has been conducted. A railgun accelerator has been investigated for a high-speed repetitive pellet acceleration. The final objective is to develop a railgun system that can achieve a 5km/s speed-class repetitive (2Hz) pellet injection. Improvement in the acceleration efficiency showed a pellet velocity of more than 2km/s using augment rails and a ceramic insulator applied to a 1m-long railgun. The other investigation focused on the development of a steady-state solid hydrogen extruder for continuous pellet injection. Screw-driven extruding system has been chosen to extrude the solid hydrogen filament continuously. Theoretical considerations suggest that temperature control of the system is important in future research. (orig.).

  18. Development of the cybernetic methods in the new generation of superhigh-energy accelerators

    International Nuclear Information System (INIS)

    Vasil'ev, A.A.; Berezhnoj, V.A.

    1985-01-01

    The problems related to the use of cybernetic methods in case of the development of control systems for superhigh-energy accelerators, particularly for parameters control which determine betatron particle oscillations are discussed. It is pointed out that early in 1960-s the development of the 1 TeV cybernetic accelerating complex consisting of a linear accelerator - injector, booster and main accelerator has been started. The conclusion is drawn that with the increase of accelerator energy, increase of ring magnet perimeter and decrease of vacuum chaber aperture as well as owing to comlication of accelerating complexes complication of operational modes and increase of particle beams intensity the use of cybernetic methods and completely automated control systems created on their base becomes in future still more pressing

  19. Baseline review of the U.S. LHC Accelerator project

    International Nuclear Information System (INIS)

    1998-02-01

    The Department of Energy (DOE) Review of the U.S. Large Hadron Collider (LHC) Accelerator project was conducted February 23--26, 1998, at the request of Dr. John R. O'Fallon, Director, Division of High Energy Physics, Office of Energy Research, U.S. DOE. This is the first review of the U.S. LHC Accelerator project. Overall, the Committee found that the U.S. LHC Accelerator project effort is off to a good start and that the proposed scope is very conservative for the funding available. The Committee recommends that the project be initially baselined at a total cost of $110 million, with a scheduled completion data of 2005. The U.S. LHC Accelerator project will supply high technology superconducting magnets for the interaction regions (IRs) and the radio frequency (rf) straight section of the LHC intersecting storage rings. In addition, the project provides the cryogenic support interface boxes to service the magnets and radiation absorbers to protect the IR dipoles and the inner triplet quadrupoles. US scientists will provide support in analyzing some of the detailed aspects of accelerator physics in the two rings. The three laboratories participating in this project are Brookhaven National Laboratory, Fermi National Accelerator Laboratory (Fermilab), and Lawrence Berkeley National Laboratory. The Committee was very impressed by the technical capabilities of the US LHC Accelerator project team. Cost estimates for each subsystem of the US LHC Accelerator project were presented to the Review Committee, with a total cost including contingency of $110 million (then year dollars). The cost estimates were deemed to be conservative. A re-examination of the funding profile, costs, and schedules on a centralized project basis should lead to an increased list of deliverables. The Committee concluded that the proposed scope of US deliverables to CERN can be readily accomplished with the $110 million total cost baseline for the project. The current deliverables should serve as

  20. Present status of accelerator-based BNCT: Focus on developments in Argentina

    International Nuclear Information System (INIS)

    Cartelli, D.; Capoulat, M.E.; Bergueiro, J.; Gagetti, L.; Suárez Anzorena, M.; Grosso, M.F. del; Baldo, M.; Castell, W.; Padulo, J.; Suárez Sandín, J.C.; Igarzabal, M.; Erhardt, J.; Mercuri, D.

    2015-01-01

    In this work we provide some information on the present status of accelerator-based BNCT (AB-BNCT) worldwide and subsequently concentrate on the recent accelerator technology developments in Argentina. - Highlights: • The current status of projects and associated facilities for AB-BNCT worldwide is shown. • Only low (few MeV) energy accelerators are included. • The recent progress of the Argentine AB-BNCT program is described.

  1. Network scheduling at Belene NPP construction site

    International Nuclear Information System (INIS)

    Matveev, A.

    2010-01-01

    Four types of schedules differing in the level of their detail are singled out to enhance the efficiency of Belene NPP Project implementation planning and monitoring: Level 1 Schedule–Summary Integrated Overall Time Schedule (SIOTS) is an appendix to EPC Contract. The main purpose of SIOTS is the large scale presentation of the current information on the Project implementation. Level 2 Schedule–Integrated Overall Time Schedule (IOTS)is the contract schedule for the Contractor (ASE JSC) and their subcontractors.The principal purpose of IOTS is the work progress planning and monitoring, the analysis of the effect of activities implementation upon the progress of the Project as a whole. IOTS is the reporting schedule at the Employer –Contractor level. Level 3 Schedules, Detail Time Schedules(DTS) are developed by those who actually perform the work and are agreed upon with Atomstroyexport JSC.The main purpose of DTS is the detail planning of Atomstroyexport subcontractor's activities. DTSare the reporting schedules at the level of Contractor-Subcontractor. Level 4 Schedules are the High Detail Time Schedules (HDTS), which are the day-to-day plans of work implementation and are developed, as a rule, for a week's time period.Each lower level time schedule details the activities of the higher level time schedule

  2. Accelerators for Discovery Science and Security applications

    Energy Technology Data Exchange (ETDEWEB)

    Todd, A.M.M., E-mail: alan_todd@mail.aesys.net; Bluem, H.P.; Jarvis, J.D.; Park, J.H.; Rathke, J.W.; Schultheiss, T.J.

    2015-05-01

    Several Advanced Energy Systems (AES) accelerator projects that span applications in Discovery Science and Security are described. The design and performance of the IR and THz free electron laser (FEL) at the Fritz-Haber-Institut der Max-Planck-Gesellschaft in Berlin that is now an operating user facility for physical chemistry research in molecular and cluster spectroscopy as well as surface science, is highlighted. The device was designed to meet challenging specifications, including a final energy adjustable in the range of 15–50 MeV, low longitudinal emittance (<50 keV-psec) and transverse emittance (<20 π mm-mrad), at more than 200 pC bunch charge with a micropulse repetition rate of 1 GHz and a macropulse length of up to 15 μs. Secondly, we will describe an ongoing effort to develop an ultrafast electron diffraction (UED) source that is scheduled for completion in 2015 with prototype testing taking place at the Brookhaven National Laboratory (BNL) Accelerator Test Facility (ATF). This tabletop X-band system will find application in time-resolved chemical imaging and as a resource for drug–cell interaction analysis. A third active area at AES is accelerators for security applications where we will cover some top-level aspects of THz and X-ray systems that are under development and in testing for stand-off and portal detection.

  3. Accelerators for Discovery Science and Security applications

    International Nuclear Information System (INIS)

    Todd, A.M.M.; Bluem, H.P.; Jarvis, J.D.; Park, J.H.; Rathke, J.W.; Schultheiss, T.J.

    2015-01-01

    Several Advanced Energy Systems (AES) accelerator projects that span applications in Discovery Science and Security are described. The design and performance of the IR and THz free electron laser (FEL) at the Fritz-Haber-Institut der Max-Planck-Gesellschaft in Berlin that is now an operating user facility for physical chemistry research in molecular and cluster spectroscopy as well as surface science, is highlighted. The device was designed to meet challenging specifications, including a final energy adjustable in the range of 15–50 MeV, low longitudinal emittance (<50 keV-psec) and transverse emittance (<20 π mm-mrad), at more than 200 pC bunch charge with a micropulse repetition rate of 1 GHz and a macropulse length of up to 15 μs. Secondly, we will describe an ongoing effort to develop an ultrafast electron diffraction (UED) source that is scheduled for completion in 2015 with prototype testing taking place at the Brookhaven National Laboratory (BNL) Accelerator Test Facility (ATF). This tabletop X-band system will find application in time-resolved chemical imaging and as a resource for drug–cell interaction analysis. A third active area at AES is accelerators for security applications where we will cover some top-level aspects of THz and X-ray systems that are under development and in testing for stand-off and portal detection

  4. Technical development of high intensity proton accelerators in Japan Atomic Energy Research Institute (JAERI)

    International Nuclear Information System (INIS)

    Mizumoto, Motoharu

    1995-01-01

    Science and Technology Agency decided 'Options making extra gains of actinides and fission products (OMEGA)' and to promote the related researches. Also in JAERI, the research on the group separation method for separating transuranic elements, strontium and cesium from high level radioactive wastes has been carried out since the beginning of 1970s. Also the concept of the fast reactors using minor actinide mixture fuel is being established, and the accelerator annihilation treatment utilizing the nuclear spallation reaction by high energy protons has been examined. In this report, from the viewpoint of the application of accelerators to atomic energy field, the annihilation treatment method by the nuclear spallation reaction utilizing high intensity proton accelerators, the plan of the various engineering utilization of proton beam, and the development of accelerators in JAERI are described. The way of thinking on the annihilation treatment of radioactive waste, the system using fast neutrons, the way of thinking on the development of high intensity proton accelerator technology, the steps of the development, the research and development for constructing the basic technology accelerator, 2 MeV beam acceleration test, the basic technology accelerator utilization facility and so on are reported. (K.I.)

  5. UCLA accelerator research and development

    International Nuclear Information System (INIS)

    Cline, D.B.

    1992-01-01

    This progress report covers work supported by the above DOE grant over the period November 1, 1991 to July 31, 1992. The work is a program of experimental and theoretical studies in advanced particle accelerator research and development for high energy physics applications. The program features research at particle beam facilities in the United States and includes research on novel high power sources, novel focussing systems (e.g. plasma lens), beam monitors, novel high brightness, high current gun systems, and novel flavor factories in particular the φ Factory

  6. Heavy ion accelerator and associated developments in India

    Indian Academy of Sciences (India)

    developments have been felt in astrophysics, materials science, radiobiology, ... facility within the family of teaching institution finally succeeded in December 1984 with ..... primary accelerator and RMS HIRA as rejecter of primary beams and ...

  7. Technology development for recirculating heavy-ion accelerators

    International Nuclear Information System (INIS)

    Newton, M.A.; Kirbie, H.C.

    1993-01-01

    The open-quotes recirculator,close quotes a recirculating heavy-ion accelerator has been identified as a promising approach for an inertial fusion driver. System studies have been conducted to evaluate the recirculator on the basis of feasibility and cost. The recirculator has been shown to have significant cost advantages over other potential driver schemes, but some of the performance requirements exceed the capabilities of present technology. The system studies identified the high leverage areas where advances in technology will significantly impact the cost and performance of a recirculator. One of the high leverage areas is the modulator system which generates the acceleration potentials in the induction cells. The modulator system must be capable of generating the acceleration potentials at peak repetition rates in excess of 100 kHz with variable pulse widths. LLNL is developing a modulator technology capable of driving induction cells using the latest in solid state MOSFET technology. A small scale modulator has been built and tested to prove the concept and the next version is presently being designed. The objective is to demonstrate a modulator operating at 5 kV, 1 kA, with 0.2--1 μs pulse widths while driving an induction cell at >100 kHz within the next year. This paper describes the recirculator, the technology requirements necessary to implement it and the modulator system development that is being pursued to meet these requirements

  8. Using a Density-Management Diagram to Develop Thinning Schedules for Loblolly Pine Plantations

    Science.gov (United States)

    Thomas J. Dean; V. Clark Baldwin

    1993-01-01

    A method for developing thinning schedules using a density-management diagram is presented. A density-management diagram is a form of stocking chart based on patterns of natural stand development. The diagram allows rotation diameter and the upper and lower limits of growing stock to be easily transformed into before and after thinning densities. Site height lines on...

  9. Accelerator system of neutron spallation source for nuclear energy technology development

    International Nuclear Information System (INIS)

    Silakhuddin; Mulyaman, Maman

    2002-01-01

    High intensity proton accelerators are at present and developed for applications in neutron spallation sources. The advantages of this source are better safety factor, easy in controlling and spent fuel free. A study of conceptual design of required accelerator system has been carried out. Considering the required proton beam and feasibility in the development stages, a stepped linac system is an adequate choice for now

  10. Development and duration of accelerated degradation of nematicides in different soils

    NARCIS (Netherlands)

    Smelt, J.H.; Peppel-Groen, van de A.E.; Pas, van der L.J.T.; Dijksterhuis, A.

    1996-01-01

    The development and duration of accelerated degradation of nematicides were studied in incubation experiments with soils from three experimental fields that had been treated annually for three to ten years with aldicarb, oxamyl, ethoprophos, fenamiphos or 1,3-dichloropropene. Highly accelerated

  11. Rework Impacts Evaluation Through System Dynamics Approach in Overlapped Product Development Schedule

    Directory of Open Access Journals (Sweden)

    Lino Guimarães Marujo

    2009-07-01

    Full Text Available This work aims to explore a novel framework to analyze the planning concepts in product development projects employing techniques to reduce the lead-time of activities, such as overlapping of a pair of each. With the System Dynamics methodology a model to evaluate the rework fraction needed to accommodate the deviations proportional to the overlapping grade of the activities. A numerical example is provided to demonstrate the validity of the model. Although problems encountered during the project management are dynamic, they have been treated on a static basis, what has as result, chronic schedules delays, overruns and cost overspent persist in follow the managers’ (reactions. In this work, we have addressed this known problem by introducing and reviewing some characteristics of the concept of rework in overlapped schedules. This consists in observe and capture the relations feedbacks among the original planned project schedule, the overlapping strategy and the inherent uncertainty in a work being done with poor information. To realize this concept, we have faced with many behaviors patterns (e.g. rework, new duration, non-conformity, and analyze the output behavior pattern, produced by the proposed model.

  12. Status Report on the Development of Micro-Scheduling Software for the Advanced Outage Control Center Project

    Energy Technology Data Exchange (ETDEWEB)

    Germain, Shawn St. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Thomas, Kenneth [Idaho National Lab. (INL), Idaho Falls, ID (United States); Farris, Ronald [Idaho National Lab. (INL), Idaho Falls, ID (United States); Joe, Jeffrey [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-09-01

    The long-term viability of existing nuclear power plants (NPPs) in the United States (U.S.) is dependent upon a number of factors, including maintaining high capacity factors, maintaining nuclear safety, and reducing operating costs, particularly those associated with refueling outages. Refueling outages typically take 20-30 days, and for existing light water NPPs in the U.S., the reactor cannot be in operation during the outage. Furthermore, given that many NPPs generate between $1-1.5 million/day in revenue when in operation, there is considerable interest in shortening the length of refueling outages. Yet, refueling outages are highly complex operations, involving multiple concurrent and dependent activities that are difficult to coordinate. Finding ways to improve refueling outage performance while maintaining nuclear safety has proven to be difficult. The Advanced Outage Control Center project is a research and development (R&D) demonstration activity under the Light Water Reactor Sustainability (LWRS) Program. LWRS is a R&D program which works with industry R&D programs to establish technical foundations for the licensing and managing of long-term, safe, and economical operation of current NPPs. The Advanced Outage Control Center project has the goal of improving the management of commercial NPP refueling outages. To accomplish this goal, this INL R&D project is developing an advanced outage control center (OCC) that is specifically designed to maximize the usefulness of communication and collaboration technologies for outage coordination and problem resolution activities. This report describes specific recent efforts to develop a capability called outage Micro-Scheduling. Micro-Scheduling is the ability to allocate and schedule outage support task resources on a sub-hour basis. Micro-Scheduling is the real-time fine-tuning of the outage schedule to react to the actual progress of the primary outage activities to ensure that support task resources are

  13. Maintenance therapy with sucralfate in duodenal ulcer: genuine prevention or accelerated healing of ulcer recurrence?

    Science.gov (United States)

    Bynum, T E; Koch, G G

    1991-08-08

    We sought to compare the efficacy of sucralfate to placebo for the prevention of duodenal ulcer recurrence and to determine that the efficacy of sucralfate was due to a true reduction in ulcer prevalence and not due to secondary effects such as analgesic activity or accelerated healing. This was a double-blind, randomized, placebo-controlled, parallel groups, multicenter clinical study with 254 patients. All patients had a past history of at least two duodenal ulcers with at least one ulcer diagnosed by endoscopic examination 3 months or less before the start of the study. Complete ulcer healing without erosions was required to enter the study. Sucralfate or placebo were dosed as a 1-g tablet twice a day for 4 months, or until ulcer recurrence. Endoscopic examinations once a month and when symptoms developed determined the presence or absence of duodenal ulcers. If a patient developed an ulcer between monthly scheduled visits, the patient was dosed with a 1-g sucralfate tablet twice a day until the next scheduled visit. Statistical analyses of the results determined the efficacy of sucralfate compared with placebo for preventing duodenal ulcer recurrence. Comparisons of therapeutic agents for preventing duodenal ulcers have usually been made by testing for statistical differences in the cumulative rates for all ulcers developed during a follow-up period, regardless of the time of detection. Statistical experts at the United States Food and Drug Administration (FDA) and on the FDA Advisory Panel expressed doubts about clinical study results based on this type of analysis. They suggested three possible mechanisms for reducing the number of observed ulcers: (a) analgesic effects, (b) accelerated healing, and (c) true ulcer prevention. Traditional ulcer analysis could miss recurring ulcers due to an analgesic effect or accelerated healing. Point-prevalence analysis could miss recurring ulcers due to accelerated healing between endoscopic examinations. Maximum ulcer

  14. NRC comprehensive records disposition schedule

    International Nuclear Information System (INIS)

    1992-03-01

    Title 44 United States Code, ''Public Printing and Documents,'' regulations cited in the General Services Administration's (GSA) ''Federal Information Resources Management Regulations'' (FIRMR), Part 201-9, ''Creation, Maintenance, and Use of Records,'' and regulation issued by the National Archives and Records Administration (NARA) in 36 CFR Chapter XII, Subchapter B, ''Records Management,'' require each agency to prepare and issue a comprehensive records disposition schedule that contains the NARA approved records disposition schedules for records unique to the agency and contains the NARA's General Records Schedules for records common to several or all agencies. The approved records disposition schedules specify the appropriate duration of retention and the final disposition for records created or maintained by the NRC. NUREG-0910, Rev. 2, contains ''NRC's Comprehensive Records Disposition Schedule,'' and the original authorized approved citation numbers issued by NARA. Rev. 2 totally reorganizes the records schedules from a functional arrangement to an arrangement by the host office. A subject index and a conversion table have also been developed for the NRC schedules to allow staff to identify the new schedule numbers easily and to improve their ability to locate applicable schedules

  15. A DIFFERENTIAL EVOLUTION ALGORITHM DEVELOPED FOR A NURSE SCHEDULING PROBLEM

    Directory of Open Access Journals (Sweden)

    Shahnazari-Shahrezaei, P.

    2012-11-01

    Full Text Available Nurse scheduling is a type of manpower allocation problem that tries to satisfy hospital managers objectives and nurses preferences as much as possible by generating fair shift schedules. This paper presents a nurse scheduling problem based on a real case study, and proposes two meta-heuristics a differential evolution algorithm (DE and a greedy randomised adaptive search procedure (GRASP to solve it. To investigate the efficiency of the proposed algorithms, two problems are solved. Furthermore, some comparison metrics are applied to examine the reliability of the proposed algorithms. The computational results in this paper show that the proposed DE outperforms the GRASP.

  16. Tools for man-machine interface development in accelerator control applications

    International Nuclear Information System (INIS)

    Kopylov, L.; Mikhev, M.; Trofimov, N.; Yurpalov, V.

    1994-01-01

    For the UNK Project a development of the Accelerator Control Applications is in the progress. These applications will use a specific Graphical User Interface for data presentation and accelerator parameter management. A number of tools have been developed based on the Motif Tool Kit. They contain a set of problem oriented screen templates and libraries. Using these tools, full scale prototype applications of the UNK Tune and Orbit measurement and correction were developed and are described, as examples. A subset of these allows the creation of the synoptic control screens from the Autocad pictures files and Oracle DB equipment descriptions. The basic concepts and a few application examples are presented. ((orig.))

  17. Recent technological developments in accelerating structures

    International Nuclear Information System (INIS)

    Yamazaki, Y.

    1992-01-01

    A variety of high-β accelerating structures for both proton and electron accelerators are reviewed from modern points of view. Both standing-and traveling-wave structures are discussed. Beam stability is one of the most important factors which must be taken into account regarding modern accelerators in which the beam intensity is an issue. (Author) 3 figs., 3 tabs., 60 refs

  18. Development of the power system for accelerator

    International Nuclear Information System (INIS)

    Kwon, Hyeokjung; Kim, D. I.; Kim, H. S.; Park, B. S.; Seol, K. T.; Yun, S. P.; Song, Y. G.; Jang, J. H.; Cho, Y. S.

    2013-02-01

    The 100-MeV proton linac needs 4 modulators whose specification is as follows, -115kV, 55A, and 9%. The development of the modulators were successfully finished and installed at Gyeongju site of KAERI. One of them was used and successfully tested in the 20-MeV linac operation at Daejeon site. The klystron is used to supply the high power RF into the accelerating structure. There are 2 klystrons for 20-MeV part of the linac and 7 klystrons from 20-MeV to 100-MeV region. The maximum voltage is ?105kV, the peak power is 1.6 MW, and the duty is 9%. All of the 7 klystrons have been fabricated, tested and installed. The high power RF system includes circulators, dummy lodes, RF windows, and wave-guides. The development of the high power RF components was finished and they were installed at the Gyeongju site. The 11 sets of RCCS (resonant control cooling system) will be used to control the cooling water temperature inside the accelerating structure. The temperature range of the cooling water covers between 21 .deg. C and 33 .deg. C with the 0.1 .deg. C control. All RCCSs were installed in the klystron gallery. Purposes of the 20-MeV linac operation at Daejeon site of KAERI (2007∼2011) are to supply proton beams to user, to porve the accelerator performance, to test the developed components including LLRF, diagnostics, and control system, and to measure the proton beam properties. During the period, the total number of samples reaches to 1,603 and the average machine availability becomes 96.2%. The 20-MeV linac was disassembled, moved and installed at Gyeongju site after finishing the test operation

  19. Artificial intelligence approaches to astronomical observation scheduling

    Science.gov (United States)

    Johnston, Mark D.; Miller, Glenn

    1988-01-01

    Automated scheduling will play an increasing role in future ground- and space-based observatory operations. Due to the complexity of the problem, artificial intelligence technology currently offers the greatest potential for the development of scheduling tools with sufficient power and flexibility to handle realistic scheduling situations. Summarized here are the main features of the observatory scheduling problem, how artificial intelligence (AI) techniques can be applied, and recent progress in AI scheduling for Hubble Space Telescope.

  20. Development of an accelerator-based BNCT facility at the Berkeley Lab

    International Nuclear Information System (INIS)

    Ludewigt, B.A.; Bleuel, D.; Chu, W.T.; Donahue, R.J.; Kwan, J.; Reginato, L.L.; Wells, R.P.

    1998-01-01

    An accelerator-based BNCT facility is under construction at the Berkeley Lab. An electrostatic-quadrupole (ESQ) accelerator is under development for the production of neutrons via the 7 Li(p,n) 7 Be reaction at proton energies between 2.3 and 2.5 MeV. A novel type of power supply, an air-core coupled transformer power supply, is being built for the acceleration of beam currents exceeding 50 mA. A metallic lithium target has been developed for handling such high beam currents. Moderator, reflector and neutron beam delimiter have extensively been modeled and designs have been identified which produce epithermal neutron spectra sharply peaked between 10 and 20 keV. These. neutron beams are predicted to deliver significantly higher doses to deep seated brain tumors, up to 50% more near the midline of the brain than is possible with currently available reactor beams. The accelerator neutron source will be suitable for future installation at hospitals

  1. Developing an efficient scheduling template of a chemotherapy treatment unit: A case study.

    Science.gov (United States)

    Ahmed, Z; Elmekkawy, Ty; Bates, S

    2011-01-01

    This study was undertaken to improve the performance of a Chemotherapy Treatment Unit by increasing the throughput and reducing the average patient's waiting time. In order to achieve this objective, a scheduling template has been built. The scheduling template is a simple tool that can be used to schedule patients' arrival to the clinic. A simulation model of this system was built and several scenarios, that target match the arrival pattern of the patients and resources availability, were designed and evaluated. After performing detailed analysis, one scenario provide the best system's performance. A scheduling template has been developed based on this scenario. After implementing the new scheduling template, 22.5% more patients can be served. 1. CancerCare Manitoba is a provincially mandated cancer care agency. It is dedicated to provide quality care to those who have been diagnosed and are living with cancer. MacCharles Chemotherapy unit is specially built to provide chemotherapy treatment to the cancer patients of Winnipeg. In order to maintain an excellent service, it tries to ensure that patients get their treatment in a timely manner. It is challenging to maintain that goal because of the lack of a proper roster, the workload distribution and inefficient resource allotment. In order to maintain the satisfaction of the patients and the healthcare providers, by serving the maximum number of patients in a timely manner, it is necessary to develop an efficient scheduling template that matches the required demand with the availability of resources. This goal can be reached using simulation modelling. Simulation has proven to be an excellent modelling tool. It can be defined as building computer models that represent real world or hypothetical systems, and hence experimenting with these models to study system behaviour under different scenarios.1, 2 A study was undertaken at the Children's Hospital of Eastern Ontario to identify the issues behind the long waiting

  2. Scheduling language and algorithm development study. Volume 1: Study summary and overview

    Science.gov (United States)

    1974-01-01

    A high level computer programming language and a program library were developed to be used in writing programs for scheduling complex systems such as the space transportation system. The objectives and requirements of the study are summarized and unique features of the specified language and program library are described and related to the why of the objectives and requirements.

  3. Performance of the intense pulsed neutron source accelerator system

    International Nuclear Information System (INIS)

    Potts, C.; Brumwell, F.; Rauchas, A.; Stipp, V.; Volk, G.

    1983-01-01

    The Intense Pulsed Neutron Source (IPNS) facility has now been operating in a routine way for outside users since November 1, 1981. From that date through December of 1982, the accelerator system was scheduled for neutron science for 4500 hours. During this time the accelerator achieved its short-term goals by delivering about 380,000,000 pulses of beam totaling over 6 x 10 20 protons. The changes in equipment and operating practices that evolved during this period of intense running are described. The intensity related instability threshold was increased by a factor of two and the accelerator beam current has been ion source limited. Plans to increase the accelerator intensity are also described. Initial operating results with a new H - ion source are discussed

  4. Spike: Artificial intelligence scheduling for Hubble space telescope

    Science.gov (United States)

    Johnston, Mark; Miller, Glenn; Sponsler, Jeff; Vick, Shon; Jackson, Robert

    1990-01-01

    Efficient utilization of spacecraft resources is essential, but the accompanying scheduling problems are often computationally intractable and are difficult to approximate because of the presence of numerous interacting constraints. Artificial intelligence techniques were applied to the scheduling of the NASA/ESA Hubble Space Telescope (HST). This presents a particularly challenging problem since a yearlong observing program can contain some tens of thousands of exposures which are subject to a large number of scientific, operational, spacecraft, and environmental constraints. New techniques were developed for machine reasoning about scheduling constraints and goals, especially in cases where uncertainty is an important scheduling consideration and where resolving conflicts among conflicting preferences is essential. These technique were utilized in a set of workstation based scheduling tools (Spike) for HST. Graphical displays of activities, constraints, and schedules are an important feature of the system. High level scheduling strategies using both rule based and neural network approaches were developed. While the specific constraints implemented are those most relevant to HST, the framework developed is far more general and could easily handle other kinds of scheduling problems. The concept and implementation of the Spike system are described along with some experiments in adapting Spike to other spacecraft scheduling domains.

  5. Advanced low-beta cavity development for proton and ion accelerators

    Energy Technology Data Exchange (ETDEWEB)

    Conway, Z.A., E-mail: zconway@anl.gov; Kelly, M.P.; Ostroumov, P.N.

    2015-05-01

    Recent developments in designing and processing low-beta superconducting cavities at Argonne National Laboratory are very encouraging for future applications requiring compact proton and ion accelerators. One of the major benefits of these accelerating structures is achieving real-estate accelerating gradients greater than 3 MV/m very efficiently either continuously or for long-duty cycle operation (>1%). The technology has been implemented in low-beta accelerator cryomodules for the Argonne ATLAS heavy-ion linac where the cryomodules are required to have real-estate gradients of more than 3 MV/m. In offline testing low-beta cavities with even higher gradients have already been achieved. This paper will review this work where we have achieved surface fields greater than 166 mT magnetic and 117 MV/m electric in a 72 MHz quarter-wave resonator optimized for β = 0.077 ions.

  6. Advanced low-beta cavity development for proton and ion accelerators

    Energy Technology Data Exchange (ETDEWEB)

    Conway, Z. A.; Kelly, M. P.; Ostroumov, P. N.

    2015-05-01

    Recent developments in designing and processing low-beta superconducting cavities at Argonne National Laboratory are very encouraging for future applications requiring compact proton and ion accelerators. One of the major benefits of these accelerating structures is achieving real-estate accelerating gradients greater than 3 MV/m very efficiently either continuously or for long-duty cycle operation (>1%). The technology has been implemented in low-beta accelerator cryomodules for the Argonne ATLAS heavy-ion linac where the cryomodules are required to have real-estate gradients of more than 3 MV/m. In offline testing low-beta cavities with even higher gradients have already been achieved. This paper will review this work where we have achieved surface fields greater than 166 mT magnetic and 117 MV/m electric in a 72 MHz quarter-wave resonator optimized for beta = 0.077 ions.

  7. Advanced low-beta cavity development for proton and ion accelerators

    International Nuclear Information System (INIS)

    Conway, Z.A.; Kelly, M.P.; Ostroumov, P.N.

    2015-01-01

    Recent developments in designing and processing low-beta superconducting cavities at Argonne National Laboratory are very encouraging for future applications requiring compact proton and ion accelerators. One of the major benefits of these accelerating structures is achieving real-estate accelerating gradients greater than 3 MV/m very efficiently either continuously or for long-duty cycle operation (>1%). The technology has been implemented in low-beta accelerator cryomodules for the Argonne ATLAS heavy-ion linac where the cryomodules are required to have real-estate gradients of more than 3 MV/m. In offline testing low-beta cavities with even higher gradients have already been achieved. This paper will review this work where we have achieved surface fields greater than 166 mT magnetic and 117 MV/m electric in a 72 MHz quarter-wave resonator optimized for β = 0.077 ions

  8. Accelerator System Development at High Voltage Engineering

    International Nuclear Information System (INIS)

    Klein, M. G.; Gottdang, A.; Haitsma, R. G.; Mous, D. J. W.

    2009-01-01

    Throughout the years, HVE has continuously extended the capabilities of its accelerator systems to meet the rising demands from a diverse field of applications, among which are deep level ion implantation, micro-machining, neutron production for biomedical research, isotope production or accelerator mass spectrometry. Characteristic for HVE accelerators is the coaxial construction of the all solid state power supply around the acceleration tubes. With the use of solid state technology, the accelerators feature high stability and very low ripple. Terminal voltages range from 1 to 6 MV for HVE Singletrons and Tandetrons. The high-current versions of these accelerators can provide ion beams with powers of several kW. In the last years, several systems have been built with terminal voltages of 1.25 MV, 2 MV and 5 MV. Recently, the first system based on a 6 MV Tandetron has passed the factory tests. In this paper we describe the characteristics of the HVE accelerator systems and present as example recent systems.

  9. Annual report of Department of Research Reactor and Tandem Accelerator, JFY2007. Operation, utilization and technical development of JRR-3, JRR-4, NSRR and tandem accelerator

    International Nuclear Information System (INIS)

    Miyazaki, Osamu; Awa, Yasuaki; Isaka, Koji; Kutsukake, Kenichi; Komeda, Masao; Shibata, Ko; Hiyama, Kazuhisa; Suzuki, Mayu; Sone, Takuya; Ohuchi, Tomoaki; Terakado, Yuichi; Sataka, Masao

    2009-06-01

    The Department of Research Reactors and Tandem Accelerator is in charge of the operation, utilization and technical development of JRR-3(Japan Research Reactor-3), JRR-4(Japan Research Reactor-4), NSRR(Nuclear Safety Research Reactor) and Tandem Accelerator. This annual report describes a summary of activities of services and technical developments carried out in the period between April 1, 2007 and March 31, 2008. The activities were categorized into five service/development fields: (1) Operation and maintenance of research reactors and tandem accelerator. (2) Utilization of research reactors and tandem accelerator. (3) Upgrading of utilization techniques of research reactors and tandem accelerator. (4) Safety administration for research reactors and tandem accelerator. (5) International cooperation. Also contained are lists of publications, meetings, granted permissions on lows and regulations concerning atomic energy, commendation, plans and outcomes in service and technical developments and so on. (author)

  10. Annual report of Department of Research Reactor and Tandem Accelerator, JFY2010. Operation, utilization and technical development of JRR-3, JRR-4, NSRR and Tandem Accelerator

    International Nuclear Information System (INIS)

    Ishii, Tetsuro; Nakamura, Kiyoshi; Kawamata, Satoshi; Yamada, Yusuke; Kawashima, Kazuhiro; Asozu, Takuhiro; Nakamura, Takemi; Arai, Masaji; Yoshinari, Shuji; Sataka, Masao

    2012-03-01

    The Department of Research Reactors and Tandem Accelerator is in charge of the operation, utilization and technical development of JRR-3(Japan Research Reactor No.3), JRR-4(Japan Research Reactor No.4), NSRR(Nuclear Safety Research Reactor) and Tandem Accelerator. This annual report describes a summary of activities of services and technical developments carried out in the period between April 1, 2010 and March 31, 2011. The activities were categorized into five service/development fields: (1) Operation and maintenance of research reactors and tandem accelerator, (2) Utilization of research reactors and tandem accelerator, (3) Upgrading of utilization techniques of research reactors and tandem accelerator, (4) Safety administration for research reactors and tandem accelerator, (5) International cooperation. Also contained are lists of publications, meetings, granted permissions on lows and regulations concerning atomic energy, commendation, outcomes in service and technical developments and so on. (author)

  11. Scheduling nursing personnel on a microcomputer.

    Science.gov (United States)

    Liao, C J; Kao, C Y

    1997-01-01

    Suggests that with the shortage of nursing personnel, hospital administrators have to pay more attention to the needs of nurses to retain and recruit them. Also asserts that improving nurses' schedules is one of the most economic ways for the hospital administration to create a better working environment for nurses. Develops an algorithm for scheduling nursing personnel. Contrary to the current hospital approach, which schedules nurses on a person-by-person basis, the proposed algorithm constructs schedules on a day-by-day basis. The algorithm has inherent flexibility in handling a variety of possible constraints and goals, similar to other non-cyclical approaches. But, unlike most other non-cyclical approaches, it can also generate a quality schedule in a short time on a microcomputer. The algorithm was coded in C language and run on a microcomputer. The developed software is currently implemented at a leading hospital in Taiwan. The response to the initial implementation is quite promising.

  12. Clinch River Breeder Reactor Plant Project: construction schedule

    International Nuclear Information System (INIS)

    Purcell, W.J.; Martin, E.M.; Shivley, J.M.

    1982-01-01

    The construction schedule for the Clinch River Breeder Reactor Plant and its evolution are described. The initial schedule basis, changes necessitated by the evaluation of the overall plant design, and constructability improvements that have been effected to assure adherence to the schedule are presented. The schedule structure and hierarchy are discussed, as are tools used to define, develop, and evaluate the schedule

  13. Enabling More than Moore: Accelerated Reliability Testing and Risk Analysis for Advanced Electronics Packaging

    Science.gov (United States)

    Ghaffarian, Reza; Evans, John W.

    2014-01-01

    For five decades, the semiconductor industry has distinguished itself by the rapid pace of improvement in miniaturization of electronics products-Moore's Law. Now, scaling hits a brick wall, a paradigm shift. The industry roadmaps recognized the scaling limitation and project that packaging technologies will meet further miniaturization needs or ak.a "More than Moore". This paper presents packaging technology trends and accelerated reliability testing methods currently being practiced. Then, it presents industry status on key advanced electronic packages, factors affecting accelerated solder joint reliability of area array packages, and IPC/JEDEC/Mil specifications for characterizations of assemblies under accelerated thermal and mechanical loading. Finally, it presents an examples demonstrating how Accelerated Testing and Analysis have been effectively employed in the development of complex spacecraft thereby reducing risk. Quantitative assessments necessarily involve the mathematics of probability and statistics. In addition, accelerated tests need to be designed which consider the desired risk posture and schedule for particular project. Such assessments relieve risks without imposing additional costs. and constraints that are not value added for a particular mission. Furthermore, in the course of development of complex systems, variances and defects will inevitably present themselves and require a decision concerning their disposition, necessitating quantitative assessments. In summary, this paper presents a comprehensive view point, from technology to systems, including the benefits and impact of accelerated testing in offsetting risk.

  14. Sport Tournament Automated Scheduling System

    OpenAIRE

    Raof R. A. A; Sudin S.; Mahrom N.; Rosli A. N. C

    2018-01-01

    The organizer of sport events often facing problems such as wrong calculations of marks and scores, as well as difficult to create a good and reliable schedule. Most of the time, the issues about the level of integrity of committee members and also issues about errors made by human came into the picture. Therefore, the development of sport tournament automated scheduling system is proposed. The system will be able to automatically generate the tournament schedule as well as automatically calc...

  15. Scheduling language and algorithm development study. Appendix: Study approach and activity summary

    Science.gov (United States)

    1974-01-01

    The approach and organization of the study to develop a high level computer programming language and a program library are presented. The algorithm and problem modeling analyses are summarized. The approach used to identify and specify the capabilities required in the basic language is described. Results of the analyses used to define specifications for the scheduling module library are presented.

  16. Accelerator development programme in India - an outlook

    International Nuclear Information System (INIS)

    Bhandari, R.K.

    2011-01-01

    With the construction of the VEC, Indus-1, Indus-2, superconducting cyclotron, superconducting heavy ion linac boosters etc. and implementation of other accelerator R and D programmes, we are now 'equipped' to take a quantum jump in the accelerator field. We have highly trained and skilled manpower that can take up challenges in this rapidly growing field both for research as well as applications. Serious planning is going on in the country to construct accelerator facilities for versatile Rare Ion Beams (RIB), powerful spallation source, advanced synchrotron source, high power beam for ADS etc. There is strong demand by the medical community for a proton/heavy ion cancer therapy facility and for accelerator-produced radioisotopes for medical diagnostics. Proliferation of accelerators in the industry field is long overdue in our country and welcome realization is coming. In this presentation a glimpse of the intended growth of accelerator field in the country will be given. Interesting challenges are there not only for the accelerator community, which has to grow, but also for the industry. Since the general trend is now to construct high intensity and high beam power accelerators - both for research as well as applications - the associated problems of radiation safety will be highlighted. (author)

  17. Development of 350 keV electron accelerator

    International Nuclear Information System (INIS)

    Qin Jiuchang; Cui Shan; Zhou Wenzhen; Cui Zhipeng; Shi Zhenghu; Lu Zhongcheng; Chen Shangwen; Zhang Lifeng; Cui Zongwei; Huang Jun; Yin Meng

    2007-01-01

    The 350 keV electron accelerator is used for irradiation and production of plas- tic film of the medical infusion bags. The body structure of Van de Graft accelerator and the high voltage power supply of Cockcrof-Walton accelerator are adopted in the electron accelerator. The 350 keV DC power supply is supplied by the high frequency power supply with 14 kHz and 35 kW. The body and DC power supply of the electron accelerator are installed in the tank filled with 0.3 MPa SF 6 . The electron accelerator is compact, self-shielding and suitable for on-line electron beam processing. The main characteristics of the facility are terminal voltage 370 kV, electron beam power 7 kW (350 keV/20 mA), scaning width 70 cm, irradiation dose inuniformity ≤7%. (authors)

  18. COAXIAL TWO-CHANNEL DIELECTRIC WAKE FIELD ACCELERATOR

    Energy Technology Data Exchange (ETDEWEB)

    Hirshfield, Jay L. [Omega-P, Inc.

    2013-04-30

    Theory, computations, and experimental apparatus are presented that describe and are intended to confirm novel properties of a coaxial two-channel dielectric wake field accelerator. In this configuration, an annular drive beam in the outer coaxial channel excites multimode wakefields which, in the inner channel, can accelerate a test beam to an energy much higher than the energy of the drive beam. This high transformer ratio is the result of judicious choice of the dielectric structure parameters, and of the phase separation between drive bunches and test bunches. A structure with cm-scale wakefields has been build for tests at the Argonne Wakefield Accelerator Laboratory, and a structure with mm-scale wakefields has been built for tests at the SLAC FACET facility. Both tests await scheduling by the respective facilities.

  19. Annual report of Department of Research Reactor and Tandem Accelerator, JFY2011. Operation, utilization and technical development of JRR-3, JRR-4, NSRR and tandem accelerator

    International Nuclear Information System (INIS)

    Ishii, Tetsuro; Nakamura, Kiyoshi; Kawamata, Satoshi; Ishikuro, Yasuhiro; Kawashima, Kazuhito; Kabumoto, Hiroshi; Nakamura, Takemi; Tamura, Itaru; Kawasaki, Sayuri; Sataka, Masao

    2013-03-01

    The Department of Research Reactors and Tandem Accelerator is in charge of the operation, utilization and technical development of JRR-3(Japan Research Reactor No.3), JRR-4(Japan Research Reactor No.4), NSRR(Nuclear Safety Research Reactor) and Tandem Accelerator. This annual report describes a summary of activities of services and technical developments carried out in the period between April 1, 2011 and March 31, 2012. The activities were categorized into six service/development fields: (1) Recovery from the Great East Japan Earthquake, (2) Operation and maintenance of research reactors and tandem accelerator, (3) Utilization of research reactors and tandem accelerator, (4) Upgrading of utilization techniques of research reactors and tandem accelerator, (5) Safety administration for research reactors and tandem accelerator, (6) International cooperation. Also contained are lists of publications, meetings, granted permissions on lows and regulations concerning atomic energy, number of staff members dispatched to Fukushima for the technical assistance, commendation, outcomes in service and technical developments and so on. (author)

  20. Development of a sealed-accelerator-tube neutron generator

    Science.gov (United States)

    Verbeke; Leung; Vujic

    2000-10-01

    Sealed-accelerator-tube neutron generators are being developed in Lawrence Berkeley National Laboratory (LBNL) for applications ranging from neutron radiography to boron neutron capture therapy and neutron activation analysis. The new generation of high-output neutron generators is based on the D-T fusion reaction, producing 14.1-MeV neutrons. The main components of the neutron tube--the ion source, the accelerator and the target--are all housed in a sealed metal container without external pumping. Thick-target neutron yield computations are performed in this paper to estimate the neutron yield of titanium and scandium targets. With an average deuteron beam current of 1 A and an energy of 120 keV, a time-averaged neutron production of approximately 10(14) n/s can be estimated for a tritiated target, for both pulsed and cw operations. In mixed deuteron/triton beam operation, a beam current of 2 A at 150 keV is required for the same neutron output. Recent experimental results on ion sources and accelerator columns are presented and discussed.

  1. A nationwide quality improvement project to accelerate Ghana's progress toward Millennium Development Goal Four: design and implementation progress.

    Science.gov (United States)

    Twum-Danso, Nana A Y; Akanlu, George B; Osafo, Enoch; Sodzi-Tettey, Sodzi; Boadu, Richard O; Atinbire, Solomon; Adondiwo, Ane; Amenga-Etego, Isaac; Ashagbley, Francis; Boadu, Eric A; Dasoberi, Ireneous; Kanyoke, Ernest; Yabang, Elma; Essegbey, Ivan T; Adjei, George A; Buckle, Gilbert B; Awoonor-Williams, J Koku; Nang-Beifubah, Alexis; Twumasi, Akwasi; McCannon, C Joseph; Barker, Pierre M

    2012-12-01

    The gap between evidence-based guidelines and practice of care is reflected, in low- and middle-income countries, by high rates of maternal and child mortality and limited effectiveness of large-scale programing to decrease those rates. We designed a phased, rapid, national scale-up quality improvement (QI) intervention to accelerate the achievement of Millennium Development Goal Four in Ghana. Our intervention promoted systems thinking, active participation of managers and frontline providers, generation and testing of local change ideas using iterative learning from transparent district and local data, local ownership and sustainability. After 50 months of implementation, we have completed two prototype learning phases and have begun regional spread phases to all health facilities in all 38 districts of the three northernmost regions and all 29 Catholic hospitals in the remaining regions of the country. To accelerate the spread of improvement, we developed 'change packages' of rigorously tested process changes along the continuum of care from pregnancy to age 5 in both inpatient and outpatient settings. The primary successes for the project so far include broad and deep adoption of QI by local stakeholders for improving system performance, widespread capacitation of leaders, managers and frontline providers in QI methods, incorporation of local ideas into change packages and successful scale-up to approximately 25% of the country's districts in 3 years. Implementation challenges include variable leadership uptake and commitment at the district level, delays due to recruiting and scheduling barriers, weak data systems and repeated QI training due to high staff turnover.

  2. Refinery scheduling

    Energy Technology Data Exchange (ETDEWEB)

    Magalhaes, Marcus V.; Fraga, Eder T. [PETROBRAS, Rio de Janeiro, RJ (Brazil); Shah, Nilay [Imperial College, London (United Kingdom)

    2004-07-01

    This work addresses the refinery scheduling problem using mathematical programming techniques. The solution adopted was to decompose the entire refinery model into a crude oil scheduling and a product scheduling problem. The envelope for the crude oil scheduling problem is composed of a terminal, a pipeline and the crude area of a refinery, including the crude distillation units. The solution method adopted includes a decomposition technique based on the topology of the system. The envelope for the product scheduling comprises all tanks, process units and products found in a refinery. Once crude scheduling decisions are Also available the product scheduling is solved using a rolling horizon algorithm. All models were tested with real data from PETROBRAS' REFAP refinery, located in Canoas, Southern Brazil. (author)

  3. Run-Time HW/SW Scheduling of Data Flow Applications on Reconfigurable Architectures

    Directory of Open Access Journals (Sweden)

    Ghaffari Fakhreddine

    2009-01-01

    Full Text Available This paper presents an efficient dynamic and run-time Hardware/Software scheduling approach. This scheduling heuristic consists in mapping online the different tasks of a highly dynamic application in such a way that the total execution time is minimized. We consider soft real-time data flow graph oriented applications for which the execution time is function of the input data nature. The target architecture is composed of two processors connected to a dynamically reconfigurable hardware accelerator. Our approach takes advantage of the reconfiguration property of the considered architecture to adapt the treatment to the system dynamics. We compare our heuristic with another similar approach. We present the results of our scheduling method on several image processing applications. Our experiments include simulation and synthesis results on a Virtex V-based platform. These results show a better performance against existing methods.

  4. Development of Improved Graphical Displays for an Advanced Outage Control Center, Employing Human Factors Principles for Outage Schedule Management

    Energy Technology Data Exchange (ETDEWEB)

    St Germain, Shawn Walter [Idaho National Lab. (INL), Idaho Falls, ID (United States); Farris, Ronald Keith [Idaho National Lab. (INL), Idaho Falls, ID (United States); Thomas, Kenneth David [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2015-09-01

    ; Provide real-time requirements monitoring; Maximize their collective situational awareness to improve decision-making; and Leverage macro data to better support resource allocation. INL has partnered with several commercial NPP utilities to develop a number of advanced outage management technologies. These outage management technologies have focused on both collaborative technologies for control centers and developing mobile technologies for NPP field workers. This report describes recent efforts made in developing a suite of outage technologies to support more effective schedule management. Currently, a master outage schedule is created months in advance using the plant’s existing scheduling software (e.g., Primavera P6). Typically, during the outage, the latest version of the schedule is printed at the beginning of each shift. INL and its partners are developing technologies that will have capabilities such as Automatic Schedule Updating, Automatic Pending Support Notifications, and the ability to allocate and schedule outage support task resources on a sub-hour basis (e.g., outage Micro-Scheduling). The remaining sections of this report describe in more detail the scheduling challenges that occur during outages, how the outage scheduling technologies INL is developing helps address those challenges, and the latest developments on this task (e.g., work accomplished to date and the path forward)

  5. Development of Improved Graphical Displays for an Advanced Outage Control Center, Employing Human Factors Principles for Outage Schedule Management

    International Nuclear Information System (INIS)

    St Germain, Shawn Walter; Farris, Ronald Keith; Thomas, Kenneth David

    2015-01-01

    ; Provide real-time requirements monitoring; Maximize their collective situational awareness to improve decision-making; and Leverage macro data to better support resource allocation. INL has partnered with several commercial NPP utilities to develop a number of advanced outage management technologies. These outage management technologies have focused on both collaborative technologies for control centers and developing mobile technologies for NPP field workers. This report describes recent efforts made in developing a suite of outage technologies to support more effective schedule management. Currently, a master outage schedule is created months in advance using the plant's existing scheduling software (e.g., Primavera P6). Typically, during the outage, the latest version of the schedule is printed at the beginning of each shift. INL and its partners are developing technologies that will have capabilities such as Automatic Schedule Updating, Automatic Pending Support Notifications, and the ability to allocate and schedule outage support task resources on a sub-hour basis (e.g., outage Micro-Scheduling). The remaining sections of this report describe in more detail the scheduling challenges that occur during outages, how the outage scheduling technologies INL is developing helps address those challenges, and the latest developments on this task (e.g., work accomplished to date and the path forward)

  6. Operation Statistics of the CERN Accelerators Complex for 2003

    CERN Document Server

    CERN. Geneva; Baird, S A; Rey, A; Steerenberg, R; CERN. Geneva. AB Department

    2004-01-01

    This report gives an overview of the performance of the different Accelerators (Linacs, PS Booster, PS, AD and SPS) of the CERN Accelerator Complex for 2003. It includes scheduled activities, beam availabilities, beam intensities and an analysis of faults and breakdowns by system and by beam. MORE INFORATION by using the OP Statistics Tool: http://eLogbook.web.cern.ch/eLogbook/statistics.php and on the SPS HomePage: http://ab-div-op-sps.web.cern.ch/ab-div-op-sps/SPSss.html

  7. Development of advanced technological systems for accelerator transmutation

    Energy Technology Data Exchange (ETDEWEB)

    Batskikh, G.I.; Bondarev, B.I.; Durkin, A.P. [Russian Academy of Sciences, Moscow (Russian Federation)] [and others

    1995-10-01

    A development concept of the accelerator nuclear energy reactors is considered for energy generation and nuclear power plant waste conversion into short-lived nuclides along with the requirements imposed on the technological systems necessary for implementation of such projects. The state of art in the field is discussed.

  8. CEBAF: A superconducting radio frequency accelerator for nuclear physics

    International Nuclear Information System (INIS)

    Hartline, B.K.

    1988-01-01

    The Continuous Electron Beam Accelerator Facility (CEBAF) will be a 4-GeV, 200-μA superconducting recirculating linear accelerator to provide CW electron beams to simultaneous nuclear physics experiments in three end stations. Funded by the Department of Energy, CEBAF's purpose is basic research on the nuclear many-body system, its quark substructure, and the strong and electroweak interactions governing this form of matter. At the heart of the accelerator are niobium superconducting accelerating cavities designed at Cornell University and successfully prototyped with industry during the past three years. The cavities consistently exceed CEBAF's performance specifications (gradient ≥ 5 MV/m, Q 0 ≥ 2.4 /times/ 10 9 at 2 K and 5 MV/m). Construction is under way, and operation is scheduled in 1994. 26 refs., 9 figs., 3 tabs

  9. New developments in design and applications for Pelletron accelerators

    International Nuclear Information System (INIS)

    Norton, Greg

    2002-01-01

    Most of the developments over the last several years related to Pelletron accelerator are in the field of accelerator mass spectrometry (AMS) and other low beam current applications with the exception of a very high DC electron recirculation Pelletron. High precision AMS systems based on tandem pelletrons from 500 kV to 5 MV terminal potential are now in use for routine high precision AMS measurements. Their performance will be reported. In addition, there has been significant advancement in the design of the multi-cathode SNICS source for the use of both gas and solid samples within a single source. The latest performance of these sources will be discussed. New diagnostics is being developed for very low beam currents. The latest design of the low current beam profile monitor (LCBPM) will also be presented. (author)

  10. Development of repetitive railgun pellet accelerator and steady-state pellet supply system

    International Nuclear Information System (INIS)

    Oda, Y.; Onozuka, M.; Azuma, K.; Kasai, S.; Hasegawa, K.

    1995-01-01

    A railgun system for repetitive high-speed pellet acceleration and steady-state pellet supply system has been developed and investigated. Using a 2m-long railgun system, the hydrogen pellet was accelerated to 2.6km/sec by the supplied energy of 1.7kJ. It is expected that the hydrogen pellet can be accelerated to 3km/sec using the present pneumatic pellet accelerator and a 2m-long augment railgun. Screw-driven hydrogen-isotope filament extruding system has been fabricated and will be tested to examine its applicability to the steady-state extrusion of the solid hydrogen-isotope filament

  11. Development of repetitive railgun pellet accelerator and steady-state pellet supply system

    Energy Technology Data Exchange (ETDEWEB)

    Oda, Y.; Onozuka, M.; Azuma, K. [Mitsubishi Heavy Industries, Ltd., Kobe (Japan); Kasai, S.; Hasegawa, K. [Japan Atomic Energy Research Inst., Naka (Japan)

    1995-12-31

    A railgun system for repetitive high-speed pellet acceleration and steady-state pellet supply system has been developed and investigated. Using a 2m-long railgun system, the hydrogen pellet was accelerated to 2.6km/sec by the supplied energy of 1.7kJ. It is expected that the hydrogen pellet can be accelerated to 3km/sec using the present pneumatic pellet accelerator and a 2m-long augment railgun. Screw-driven hydrogen-isotope filament extruding system has been fabricated and will be tested to examine its applicability to the steady-state extrusion of the solid hydrogen-isotope filament.

  12. Development of a dual ion beam system with single accelerator for materials studies

    International Nuclear Information System (INIS)

    Suzuki, Kazumichi; Nishimura, Eiichi; Hashimoto, Tsuneyuki

    1986-01-01

    The dual ion beam accelerator system has been developed for simulation studies of neutron radiation damage of structural materials for nuclear fusion and fission reactors. One accelerator is used to accelerate two different kinds of ions, which are generated in the ion source simultaneously. One of these ions is selected alternatively by switching the magnetic field of the analyzing magnet, and is then accelerated to the desired energy value. The system is controlled by a microcomputer. The accelerator used in the system is a conventional 400 kV Cockcroft-Walton accelerator. The performance test by the acceleration of He + and Ar + shows that the system is capable of accelerating two ions alternatively with a switching time of less than 22 s. The beam current obtained with the microcomputer control is more than 98% of the current obtained by manual operation. (orig.)

  13. Industrial and medicine accelerators and prospects of their development in the 11 five year plan

    International Nuclear Information System (INIS)

    Vakhrushin, Yu.P.; Glukhikh, V.A.; Svin'in, M.P.

    1981-01-01

    The data on development and introduction of accelerators into industry and medicine, improvement of their technical-and-econmic factors are presented. A parametric series of high-voltage electron accelerators which includes seven models covering the 0.15-4 MeV energy range, is developed. A common series of linear resonance accelerators for non-destructive testing, radio-therapy, activation analysis and radiation technology cover the 3-40 MeV electron energy range. The series includes 12 modifications of accelerators made of unified modules. A linear induction accelerator with up to 200 kW average beam power for using in an installation for liquid waste decontamination is under development. A parametric series of cyclotrons for industry and medicine using electron beams at 6-220 MeV energy and up to 200 μmA current is developed [ru

  14. New heavy-ion accelerator facility at Oak Ridge

    International Nuclear Information System (INIS)

    Stelson, P.H.

    1974-01-01

    Funds were obtained to establish a new national heavy-ion facility to be located at Oak Ridge. The principal component of this facility is a 25-MW tandem designed specifically for good heavy-ion acceleration, which will provide high quality beams of medium weight ions for nuclear research by itself. The tandem beams will also be injected into ORIC for additional energy gain, so that usable beams for nuclear physics research can be extended to about A = 160. A notable feature of the tandem is that it will be of the ''folded'' type, in which both the negative and positive accelerating tubes are contained in the same column. The accelerator system, the experimental lay-out, and the time schedule for the project are discussed

  15. Development of laboratory acceleration test method for service life prediction of concrete structures

    International Nuclear Information System (INIS)

    Cho, M. S.; Song, Y. C.; Bang, K. S.; Lee, J. S.; Kim, D. K.

    1999-01-01

    Service life prediction of nuclear power plants depends on the application of history of structures, field inspection and test, the development of laboratory acceleration tests, their analysis method and predictive model. In this study, laboratory acceleration test method for service life prediction of concrete structures and application of experimental test results are introduced. This study is concerned with environmental condition of concrete structures and is to develop the acceleration test method for durability factors of concrete structures e.g. carbonation, sulfate attack, freeze-thaw cycles and shrinkage-expansion etc

  16. PLAN-IT - Scheduling assistant for solar system exploration

    International Nuclear Information System (INIS)

    Dias, W. C.; Henricks, J. A.; Wong, J. C.; California Institute of Technology, Pasadena)

    1987-01-01

    A frame-based expert scheduling system shell, PLAN-IT, is developed for spacecraft scheduling in the Request Integration Phase, using the Comet Rendezvous Asteroid Flyby (CRAF) mission as a development base. Basic, structured, and expert scheduling techniques are reviewed. Data elements such as activity representation and resource conflict representation are discussed. Resource constraints include minimum and maximum separation times between activities, percentage of time pointed at specific targets, and separation time between targeted intervals of a given activity. The different scheduling technique categories and the rationale for their selection are also considered. 13 references

  17. Accelerating Leadership Development via Immersive Learning and Cognitive Apprenticeship

    Science.gov (United States)

    Backus, Clark; Keegan, Kevin; Gluck, Charles; Gulick, Lisa M. V.

    2010-01-01

    The authors put forward an approach to leadership development that builds on the principle of accelerated learning. They argue that leadership development, particularly in a period of recession or slow economic growth, needs to deliver results more quickly and with fewer resources. Indeed, they raise the question of whether or not this is what is…

  18. A hybrid job-shop scheduling system

    Science.gov (United States)

    Hellingrath, Bernd; Robbach, Peter; Bayat-Sarmadi, Fahid; Marx, Andreas

    1992-01-01

    The intention of the scheduling system developed at the Fraunhofer-Institute for Material Flow and Logistics is the support of a scheduler working in a job-shop. Due to the existing requirements for a job-shop scheduling system the usage of flexible knowledge representation and processing techniques is necessary. Within this system the attempt was made to combine the advantages of symbolic AI-techniques with those of neural networks.

  19. MO-E-BRD-02: Accelerated Partial Breast Irradiation in Brachytherapy: Is Shorter Better?

    International Nuclear Information System (INIS)

    Todor, D.

    2015-01-01

    Is Non-invasive Image-Guided Breast Brachytherapy Good? – Jess Hiatt, MS Non-invasive Image-Guided Breast Brachytherapy (NIBB) is an emerging therapy for breast boost treatments as well as Accelerated Partial Breast Irradiation (APBI) using HDR surface breast brachytherapy. NIBB allows for smaller treatment volumes while maintaining optimal target coverage. Considering the real-time image-guidance and immobilization provided by the NIBB modality, minimal margins around the target tissue are necessary. Accelerated Partial Breast Irradiation in brachytherapy: is shorter better? - Dorin Todor, PhD VCU A review of balloon and strut devices will be provided together with the origins of APBI: the interstitial multi-catheter implant. A dosimetric and radiobiological perspective will help point out the evolution in breast brachytherapy, both in terms of devices and the protocols/clinical trials under which these devices are used. Improvements in imaging, delivery modalities and convenience are among the factors driving the ultrashort fractionation schedules but our understanding of both local control and toxicities associated with various treatments is lagging. A comparison between various schedules, from a radiobiological perspective, will be given together with a critical analysis of the issues. to review and understand the evolution and development of APBI using brachytherapy methods to understand the basis and limitations of radio-biological ‘equivalence’ between fractionation schedules to review commonly used and proposed fractionation schedules Intra-operative breast brachytherapy: Is one stop shopping best?- Bruce Libby, PhD. University of Virginia A review of intraoperative breast brachytherapy will be presented, including the Targit-A and other trials that have used electronic brachytherapy. More modern approaches, in which the lumpectomy procedure is integrated into an APBI workflow, will also be discussed. Learning Objectives: To review past and current

  20. MO-E-BRD-02: Accelerated Partial Breast Irradiation in Brachytherapy: Is Shorter Better?

    Energy Technology Data Exchange (ETDEWEB)

    Todor, D. [Virginia Commonwealth University (United States)

    2015-06-15

    Is Non-invasive Image-Guided Breast Brachytherapy Good? – Jess Hiatt, MS Non-invasive Image-Guided Breast Brachytherapy (NIBB) is an emerging therapy for breast boost treatments as well as Accelerated Partial Breast Irradiation (APBI) using HDR surface breast brachytherapy. NIBB allows for smaller treatment volumes while maintaining optimal target coverage. Considering the real-time image-guidance and immobilization provided by the NIBB modality, minimal margins around the target tissue are necessary. Accelerated Partial Breast Irradiation in brachytherapy: is shorter better? - Dorin Todor, PhD VCU A review of balloon and strut devices will be provided together with the origins of APBI: the interstitial multi-catheter implant. A dosimetric and radiobiological perspective will help point out the evolution in breast brachytherapy, both in terms of devices and the protocols/clinical trials under which these devices are used. Improvements in imaging, delivery modalities and convenience are among the factors driving the ultrashort fractionation schedules but our understanding of both local control and toxicities associated with various treatments is lagging. A comparison between various schedules, from a radiobiological perspective, will be given together with a critical analysis of the issues. to review and understand the evolution and development of APBI using brachytherapy methods to understand the basis and limitations of radio-biological ‘equivalence’ between fractionation schedules to review commonly used and proposed fractionation schedules Intra-operative breast brachytherapy: Is one stop shopping best?- Bruce Libby, PhD. University of Virginia A review of intraoperative breast brachytherapy will be presented, including the Targit-A and other trials that have used electronic brachytherapy. More modern approaches, in which the lumpectomy procedure is integrated into an APBI workflow, will also be discussed. Learning Objectives: To review past and current

  1. Accelerating Early Language Development with Multi-Sensory Training

    Science.gov (United States)

    Bjorn, Piia M.; Kakkuri, Irma; Karvonen, Pirkko; Leppanen, Paavo H. T.

    2012-01-01

    This paper reports the outcome of a multi-sensory intervention on infant language skills. A programme titled "Rhyming Game and Exercise Club", which included kinaesthetic-tactile mother-child rhyming games performed in natural joint attention situations, was intended to accelerate Finnish six- to eight-month-old infants' language development. The…

  2. Development of high current injector for tandem accelerator

    Energy Technology Data Exchange (ETDEWEB)

    Baba, Takashi; Iwamoto, Eiji [Nissin - High Voltage Co. Ltd., Kyoto (Japan); Kishimoto, Naoki; Saito, Tetsuya; Mori, Yoshiharu

    1997-02-01

    The development of the electrostatic type tandem accelerators has been carried out so far, but by the recent remarkable progress of negative ion sources, the beam current which was inconceivable so far has become obtainable, and the use as the electrostatic type tandem accelerators is expanding rapidly. The problem which must be solved in the development of a high energy, large current heavy ion injection device is the development of an injector. As to the generation of negative ions, by the development of plasma sputter negative ion sources, the almost satisfactory performance has been obtained in beam current, emittance, life and so on, but as for the transport and control of generated negative ion beam, there is the large problem of spatial charge effect. This time, the verifying test on this problem was carried out, therefore, its contents and results are reported. The equipment which was developed this time was delivered to the Institute for Materials Research. Its specifications are shown. The whole constitution, negative ion source, and beam transport system are described. Beam generation test and spatial charge effect test are reported. The test stand was made, and in the verifying test, the maximum beams of 4 mA in Cu and 3 mA in Ni were able to be generated and transported. The effect of the countermeasures to spatial charge effect was confirmed. (K.I.)

  3. Development of linear proton accelerators with the high average beam power

    CERN Document Server

    Bomko, V A; Egorov, A M

    2001-01-01

    Review of the current situation in the development of powerful linear proton accelerators carried out in many countries is given. The purpose of their creation is solving problems of safe and efficient nuclear energetics on a basis of the accelerator-reactor complex. In this case a proton beam with the energy up to 1 GeV, the average current of 30 mA is required. At the same time there is a needed in more powerful beams,for example, for production of tritium and transmutation of nuclear waste products. The creation of accelerators of such a power will be followed by the construction of linear accelerators of 1 GeV but with a more moderate beam current. They are intended for investigation of many aspects of neutron physics and neutron engineering. Problems in the creation of efficient constructions for the basic and auxiliary equipment, the reliability of the systems, and minimization of the beam losses in the process of acceleration will be solved.

  4. Development of the Accelerator Mass Spectrometry technology at the Comenius University in Bratislava

    Science.gov (United States)

    Povinec, Pavel P.; Masarik, Jozef; Ješkovský, Miroslav; Kaizer, Jakub; Šivo, Alexander; Breier, Robert; Pánik, Ján; Staníček, Jaroslav; Richtáriková, Marta; Zahoran, Miroslav; Zeman, Jakub

    2015-10-01

    An Accelerator Mass Spectrometry (AMS) laboratory has been established at the Centre for Nuclear and Accelerator Technologies (CENTA) at the Comenius University in Bratislava comprising of a MC-SNICS ion source, 3 MV Pelletron tandem accelerator, and an analyzer of accelerated ions. The preparation of targets for 14C and 129I AMS measurements is described in detail. The development of AMS techniques for potassium, uranium and thorium analysis in radiopure materials required for ultra-low background underground experiments is briefly mentioned.

  5. High gradient test of the C-band choke-mode type accelerating structure

    International Nuclear Information System (INIS)

    Inagaki, T.; Shintake, T.; Baba, H.; Togawa, K.; Onoe, K.; Marechal, X.; Takashima, T.; Takahashi, S.; Matsumoto, H.

    2004-01-01

    The C-band (5712 MHz) choke-mode type accelerating structure will be used for SPring-8 Compact SASE-FEL Source (SCSS). To make the accelerator length short, we designed the field gradient as high as 40 MV/m. Since it is higher gradient than other traditional electron accelerators, we have to carefully check its performance (RF breakdown, dark current emission, etc.) in the high gradient test stand. The first experiment will be scheduled in this summer. In this paper, we will describe the preparation progress for the test. (author)

  6. Developing a new method for modifying over-allocated multi-mode resource constraint schedules in the presence of preemptive resources

    Directory of Open Access Journals (Sweden)

    Aidin Delgoshaei

    2016-09-01

    Full Text Available The issue of resource over-allocating is a big concern for project engineers in the process of scheduling project activities. Resource over-allocating is frequently seen after initial scheduling of a project in practice and causes significant amount of efforts to modify the initial schedules. In this research, a new method is developed for modifying over-allocated schedules in a multi-mode resource constrained project scheduling problems (MRCPSPs with positive cash flows (MRCPSP-PCF. The aim is to maximize profit of the MRCPSPs or logically minimizing costs. The proposed method can be used as a macro in Microsoft Office Project® Software to modify resource over-allocated days after scheduling a project. This research considers progress payment method and preemptive resources. The proposed approach maximizes profit by scheduling activities through the resource calendar respecting to the available level of preemptive resources and activity numbers. To examine the performance of the proposed method a number of experiments derived from the literature are solved. The results are then compared with the circumstances where resource constraints are relaxed. The outcomes show that in all studied cases, the proposed algorithm can provide modified schedules with no over-allocated days. Afterward the method is applied to modify a manufacturing project in practice.

  7. Optimization of Hierarchically Scheduled Heterogeneous Embedded Systems

    DEFF Research Database (Denmark)

    Pop, Traian; Pop, Paul; Eles, Petru

    2005-01-01

    We present an approach to the analysis and optimization of heterogeneous distributed embedded systems. The systems are heterogeneous not only in terms of hardware components, but also in terms of communication protocols and scheduling policies. When several scheduling policies share a resource......, they are organized in a hierarchy. In this paper, we address design problems that are characteristic to such hierarchically scheduled systems: assignment of scheduling policies to tasks, mapping of tasks to hardware components, and the scheduling of the activities. We present algorithms for solving these problems....... Our heuristics are able to find schedulable implementations under limited resources, achieving an efficient utilization of the system. The developed algorithms are evaluated using extensive experiments and a real-life example....

  8. Shiftwork Scheduling for the 1990s.

    Science.gov (United States)

    Coleman, Richard M.

    1989-01-01

    The author discusses the problems of scheduling shift work, touching on such topics as employee desires, health requirements, and business needs. He presents a method for developing shift schedules that addresses these three areas. Implementation hints are also provided. (CH)

  9. Developing a clinical proton accelerator facility: Consortium-assisted technology transfer

    International Nuclear Information System (INIS)

    Slater, J.M.; Miller, D.W.; Slater, J.W.

    1991-01-01

    A hospital-based proton accelerator facility has emerged from the efforts of a consortium of physicists, engineers and physicians from several high-energy physics laboratories, industries and universities, working together to develop the requirements and conceptual design for a clinical program. A variable-energy medical synchrotron for accelerating protons to a prescribed energy, intensity and beam quality, has been placed in a hospital setting at Loma Linda University Medical Center for treating patients with localized cancer. Treatments began in October 1990. Scientists from Fermi National Accelerator Laboratory; Harvard Cyclotron Laboratory; Lawrence Berkeley Laboratories; the Paul Scherrer Institute; Uppsala, Sweden; Argonne, Brookhaven and Los Alamos National Laboratories; and Loma Linda University, all cooperated to produce the conceptual design. Loma Linda University contracted with Fermi National Accelerator Laboratory to design and build a 250 MeV synchrotron and beam transport system, the latter to guide protons into four treatment rooms. Lawrence Berkeley Laboratories consulted with Loma Linda University on the design of the beam delivery system (nozzle). A gantry concept devised by scientists at Harvard Cyclotron Laboratory, was adapted and fabricated by Science Applications International Corporation. The control and safety systems were designed and developed by Loma Linda University Radiation Research Laboratory. Presently, the synchrotron, beam transport system and treatment room hardware have been installed and tested and are operating satisfactorily

  10. Identification of the recommended waste management systems and system development schedules: Regional Management Plan

    International Nuclear Information System (INIS)

    1986-01-01

    This report describes the evaluations of alternatives for low-level waste treatment and disposal leading to the selection of four disposal methods and two treatment alternatives (including the alternative of only continuing current methods of waste treatment used by the waste generators) that were used to form candidate waste management systems. The subsequent evaluation of waste management systems and schedules for the development of the regional waste management system under four different scenarios are also included. The report also describes the consequences to the member states and their waste generators of the four scenarios and presents insights into preferred courses of action that arise from the scheduling exercise. 13 refs., 14 figs., 2 tabs

  11. Prospects of development of accelerators for applied purposes on the base of patent information analysis

    International Nuclear Information System (INIS)

    Dmitriev, S.P.; Prudnikov, I.A.; Fedotov, M.T.; Petrov, I.I.

    1979-01-01

    A technique for investigations of tends of commercial accelerator development is described. The technique is intended determining the nature of change of the dynamics criterium of trends of development (type of accelerator) and obtaining its mean value from the equation of curvibinear one-parametric regression. The technique developed was tested in the process of analysis of 2000 inventions related to charged particle accelerators. The first stage of calculations is based on the analysis of retrospective data fund and analysis of the data on introduced engineering solutions. The second stage is based on the analysis of physical-technical characteristics of compared objects and requirements to this objects. Mean period of invention introduction in accelerating technique (12-15 years) has been determined and correctness of estimation from the retrospective fund of inventions and modern data on introduced accelerators has been cheeked. The checking revealed the correspondence of accelerator distribution in a value of dynamics criterium [ru

  12. Construction schedules slack time minimizing

    Science.gov (United States)

    Krzemiński, Michał

    2017-07-01

    The article presents two copyright models for minimizing downtime working brigades. Models have been developed for construction schedules performed using the method of work uniform. Application of flow shop models is possible and useful for the implementation of large objects, which can be divided into plots. The article also presents a condition describing gives which model should be used, as well as a brief example of optimization schedule. The optimization results confirm the legitimacy of the work on the newly-developed models.

  13. Decentralized Ground Staff Scheduling

    DEFF Research Database (Denmark)

    Sørensen, M. D.; Clausen, Jens

    2002-01-01

    scheduling is investigated. The airport terminal is divided into zones, where each zone consists of a set of stands geographically next to each other. Staff is assigned to work in only one zone and the staff scheduling is planned decentralized for each zone. The advantage of this approach is that the staff...... work in a smaller area of the terminal and thus spends less time walking between stands. When planning decentralized the allocation of stands to flights influences the staff scheduling since the workload in a zone depends on which flights are allocated to stands in the zone. Hence solving the problem...... depends on the actual stand allocation but also on the number of zones and the layout of these. A mathematical model of the problem is proposed, which integrates the stand allocation and the staff scheduling. A heuristic solution method is developed and applied on a real case from British Airways, London...

  14. Developments in accelerators for heavy ion fusion

    International Nuclear Information System (INIS)

    Keefe, D.

    1985-01-01

    The long term goal of Heavy Ion Fusion (HIF) is the development of an accelerator with the large beam power, large beam stored-energy, and high brightness needed to implode small deuterium-tritium capsules for fusion power. While studies of an RF linac/storage ring combination as an intertial fusion driver continue in Japan and Europe, the US program in recent times has concentrated on the study of the suitability of linear induction acceleration of ions for this purpose. Novel features required include use of multiple beams, beam current amplification in the linac, and manipulation of long beam bunches with a large velocity difference between head and tail. Recent experiments with an intense bright beam of cesium ions have established that much higher currents can be transported in a long quadrupole system than was believed possible a few years ago. A proof-of-principle ion induction linac to demonstrate beam current amplification with multiple beams is at present being fabricated at LBL

  15. Developments in accelerators for heavy ion fusion

    International Nuclear Information System (INIS)

    Keefe, D.

    1985-05-01

    The long term goal of Heavy Ion Fusion (HIF) is the development of an accelerator with the large beam power, large beam stored-energy, and high brightness needed to implode small deuterium-tritium capsules for fusion power. While studies of an rf linac/storage ring combination as an inertial fusion driver continue in Japan and Europe, the US program in recent times has concentrated on the study of the suitability of linear induction acceleration of ions for this purpose. Novel features required include use of multiple beams, beam current amplification in the linac, and manipulation of long beam bunches with a large velocity difference between head and tail. Recent experiments with an intense bright beam of cesium ions have established that much higher currents can be transported in a long quadrupole system than was believed possible a few years ago. A proof-of-principle ion induction linac to demonstrate beam current amplification with multiple beams is at present being fabricated at LBL. 28 refs., 4 figs

  16. Development of the Accelerator Mass Spectrometry technology at the Comenius University in Bratislava

    Energy Technology Data Exchange (ETDEWEB)

    Povinec, Pavel P., E-mail: povinec@fmph.uniba.sk; Masarik, Jozef; Ješkovský, Miroslav; Kaizer, Jakub; Šivo, Alexander; Breier, Robert; Pánik, Ján; Staníček, Jaroslav; Richtáriková, Marta; Zahoran, Miroslav; Zeman, Jakub

    2015-10-15

    An Accelerator Mass Spectrometry (AMS) laboratory has been established at the Centre for Nuclear and Accelerator Technologies (CENTA) at the Comenius University in Bratislava comprising of a MC-SNICS ion source, 3 MV Pelletron tandem accelerator, and an analyzer of accelerated ions. The preparation of targets for {sup 14}C and {sup 129}I AMS measurements is described in detail. The development of AMS techniques for potassium, uranium and thorium analysis in radiopure materials required for ultra-low background underground experiments is briefly mentioned.

  17. Combinations of response-reinforcer relations in periodic and aperiodic schedules.

    Science.gov (United States)

    Kuroda, Toshikazu; Cançado, Carlos R X; Lattal, Kennon A; Elcoro, Mirari; Dickson, Chata A; Cook, James E

    2013-03-01

    Key pecking of 4 pigeons was studied under a two-component multiple schedule in which food deliveries were arranged according to a fixed and a variable interfood interval. The percentage of response-dependent food in each component was varied, first in ascending (0, 10, 30, 70 and 100%) and then in descending orders, in successive conditions. The change in response rates was positively related to the percentage of response-dependent food in each schedule component. Across conditions, positively accelerated and linear patterns of responding occurred consistently in the fixed and variable components, respectively. These results suggest that the response-food dependency determines response rates in periodic and aperiodic schedules, and that the temporal distribution of food determines response patterns independently of the response-food dependency. Running rates, but not postfood pauses, also were positively related to the percentage of dependent food in each condition, in both fixed and variable components. Thus, the relation between overall response rate and the percentage of dependent food was mediated by responding that occurred after postfood pausing. The findings together extend previous studies wherein the dependency was either always present or absent, and increase the generality of the effects of variations in the response-food dependency from aperiodic to periodic schedules. © Society for the Experimental Analysis of Behavior.

  18. Accelerator-driven subcritical facility:Conceptual design development

    Science.gov (United States)

    Gohar, Yousry; Bolshinsky, Igor; Naberezhnev, Dmitry; Duo, Jose; Belch, Henry; Bailey, James

    2006-06-01

    A conceptual design development of an accelerator-driven subcritical facility has been carried out in the preparation of a joint activity with Kharkov Institute of Physics and Technology of Ukraine. The main functions of the facility are the medical isotope production and the support of the Ukraine nuclear industry. An electron accelerator is considered to drive the subcritical assembly. The neutron source intensity and spectrum have been studied. The energy deposition, spatial neutron generation, neutron utilization fraction, and target dimensions have been quantified to define the main target performance parameters, and to select the target material and beam parameters. Different target conceptual designs have been developed based the engineering requirements including heat transfer, thermal hydraulics, structure, and material issues. The subcritical assembly is designed to obtain the highest possible neutron flux level with a Keff of 0.98. Different fuel materials, uranium enrichments, and reflector materials are considered in the design process. The possibility of using low enrichment uranium without penalizing the facility performance is carefully evaluated. The mechanical design of the facility has been developed to maximize its utility and minimize the time for replacing the target and the fuel assemblies. Safety, reliability, and environmental considerations are included in the facility conceptual design. The facility is configured to accommodate future design improvements, upgrades, and new missions. In addition, it has large design margins to accommodate different operating conditions and parameters. In this paper, the conceptual design and the design analyses of the facility will be presented.

  19. California LLW disposal site development update: Ahead of milestone schedule

    International Nuclear Information System (INIS)

    Romano, S.A.; Gaynor, R.K.

    1987-01-01

    US Ecology has been designated by the State of California to locate, develop and operate a low-level radioactive waste disposal facility. In early 1986, the firm identified eighteen desert basins in southeastern California for siting consideration. Three candidate sites were selected for detailed field characterization work in February, 1987. A preferred site for licensing purposes will be identified in early 1988. California is currently ahead of the siting milestone schedule mandated by the Low-Level Radioactive Waste Policy Amendments Act. It is likely that a license application will be filed before the 1990 milestone date. This paper describes the process undertaken by US Ecology to identify three candidates sites for characterization, and the public involvement program supporting this decision. Future activities leading to final site development are also described

  20. From laser-plasma accelerators to femtosecond X-ray sources: study, development and applications

    International Nuclear Information System (INIS)

    Corde, S.

    2012-01-01

    During the relativistic interaction between a short and intense laser pulse and an underdense plasma, electrons can be injected and accelerated up to hundreds of MeV in an accelerating structure formed in the wake of the pulse: this is the so-called laser-plasma accelerator. One of the major perspectives for laser-plasma accelerators resides in the realization of compact sources of femtosecond x-ray beams. In this thesis, two x-ray sources was studied and developed. The betatron radiation, intrinsic to laser-plasma accelerators, comes from the transverse oscillations of electrons during their acceleration. Its characterization by photon counting revealed an x-ray beam containing 10"9 photons, with energies extending above 10 keV. We also developed an all-optical Compton source producing photons with energies up to hundreds of keV, based on the collision between a photon beam and an electron beam. The potential of these x-ray sources was highlighted by the realization of single shot phase contrast imaging of a biological sample. Then, we showed that the betatron x-ray radiation can be a powerful tool to study the physics of laser-plasma acceleration. We demonstrated the possibility to map the x-ray emission region, which gives a unique insight into the interaction, permitting us for example to locate the region where electrons are injected. The x-ray angular and spectral properties allow us to gain information on the transverse dynamics of electrons during their acceleration. (author)

  1. Robust scheduling in an uncertain environment

    NARCIS (Netherlands)

    Wilson, M.

    2016-01-01

    This thesis presents research on scheduling in an uncertain environment, which forms a part of the rolling stock life cycle logistics applied research and development program funded by Dutch railway industry companies. The focus therefore lies on scheduling of maintenance operations on rolling stock

  2. Planning and Scheduling of Airline Operations

    Directory of Open Access Journals (Sweden)

    İlkay ORHAN

    2010-02-01

    Full Text Available The Turkish Civil Aviation sector has grown at a rate of 53 % between the years 2002-2008 owing to countrywide economical developments and some removed restrictions in the aviation field. Successful international companies in the sector use advanced computer-supported solution methods for their planning and scheduling problems. These methods have been providing significant competitive advantages to those companies. There are four major scheduling and planning problems in the airline sector: flight scheduling, aircraft scheduling, crew scheduling and disruptions management. These aforementioned scheduling and planning problems faced by all airline companies in the airline sector were examined in detail. Studies reveal that companies using the advanced methods might gain significant cost reductions. However, even then, the time required for solving large scale problems may not satisfy the decision quality desired by decision makers. In such cases, using modern decision methods integrated with advanced technologies offer companies an opportunity for significant cost-advantages.

  3. Progress of the Felsenkeller Shallow-Underground Accelerator for Nuclear Astrophysics

    Science.gov (United States)

    Bemmerer, D.; Cavanna, F.; Cowan, T. E.; Grieger, M.; Hensel, T.; Junghans, A. R.; Ludwig, F.; Müller, S. E.; Rimarzig, B.; Reinicke, S.; Schulz, S.; Schwengner, R.; Stöckel, K.; Szücs, T.; Takács, M. P.; Wagner, A.; Wagner, L.; Zuber, K.

    Low-background experiments with stable ion beams are an important tool for putting the model of stellar hydrogen, helium, and carbon burning on a solid experimental foundation. The pioneering work in this regard has been done by the LUNA collaboration at Gran Sasso, using a 0.4 MV accelerator. In the present contribution, the status of the project for a higher-energy underground accelerator is reviewed. Two tunnels of the Felsenkeller underground site in Dresden, Germany, are currently being refurbished for the installation of a 5 MV high-current Pelletron accelerator. Construction work is on schedule and expected to complete in August 2017. The accelerator will provide intense, 50 µA, beams of 1H+, 4He+, and 12C+ ions, enabling research on astrophysically relevant nuclear reactions with unprecedented sensitivity.

  4. Community Petascale Project for Accelerator Science and Simulation: Advancing Computational Science for Future Accelerators and Accelerator Technologies

    Energy Technology Data Exchange (ETDEWEB)

    Spentzouris, P.; /Fermilab; Cary, J.; /Tech-X, Boulder; McInnes, L.C.; /Argonne; Mori, W.; /UCLA; Ng, C.; /SLAC; Ng, E.; Ryne, R.; /LBL, Berkeley

    2011-11-14

    The design and performance optimization of particle accelerators are essential for the success of the DOE scientific program in the next decade. Particle accelerators are very complex systems whose accurate description involves a large number of degrees of freedom and requires the inclusion of many physics processes. Building on the success of the SciDAC-1 Accelerator Science and Technology project, the SciDAC-2 Community Petascale Project for Accelerator Science and Simulation (ComPASS) is developing a comprehensive set of interoperable components for beam dynamics, electromagnetics, electron cooling, and laser/plasma acceleration modelling. ComPASS is providing accelerator scientists the tools required to enable the necessary accelerator simulation paradigm shift from high-fidelity single physics process modeling (covered under SciDAC1) to high-fidelity multiphysics modeling. Our computational frameworks have been used to model the behavior of a large number of accelerators and accelerator R&D experiments, assisting both their design and performance optimization. As parallel computational applications, the ComPASS codes have been shown to make effective use of thousands of processors. ComPASS is in the first year of executing its plan to develop the next-generation HPC accelerator modeling tools. ComPASS aims to develop an integrated simulation environment that will utilize existing and new accelerator physics modules with petascale capabilities, by employing modern computing and solver technologies. The ComPASS vision is to deliver to accelerator scientists a virtual accelerator and virtual prototyping modeling environment, with the necessary multiphysics, multiscale capabilities. The plan for this development includes delivering accelerator modeling applications appropriate for each stage of the ComPASS software evolution. Such applications are already being used to address challenging problems in accelerator design and optimization. The ComPASS organization

  5. Impact of accelerated plant growth on seed variety development

    Science.gov (United States)

    Christophersen, Eric

    1998-01-01

    The commercial lives of agricultural seed products have steadily declined in recent years. The introduction of genetically engineered crop seeds in 1966 has accentuated that trend. Widespread grower demand for genetically engineered seed requires competitive response by industry followers in order to avert market share losses to the industry leaders. Limitations on plant transformation technology, regulatory requirements and patent impediments require companies to rapidly convert transformed lines into elite commercial products. Massive multigenerational backcrossing efforts are required to distribute genetically engineered traits into a broad product mix. Significant incidents of expression failures, or ``gene silencing,'' have occurred unexpectedly, requiring product substitution strategies. First-to-market strategies, competitive response, broad germplasm conversion and rescue of product failures all share the element of urgency. Technologies which reliably accelerate product development rates can expect favorable reception by commercial seed developers. A growth chamber which dramatically accelerates the rate of plant growth is described.

  6. The CEBAF accelerator and its physics program

    International Nuclear Information System (INIS)

    Cardman, L.S.

    1993-01-01

    The continuous electron beam accelerator facility (CEBAF) consists of a pair of 400 MeV superconducting linacs together with a 5-pass recirculation system and beam switchyard that will permit it to provide three, simultaneous 4 GeV, cw electron beams with a total current of up to 200 μA. The conventional construction for the accelerator and the three experimental end stations is essentially complete. The first linac has been installed in the accelerator tunnel and beam has been accelerated through it; all tests to date have met or exceeded the design specifications. The major components of the experimental equipment for the end stations are under construction. Operation of CEBAF for nuclear physics is scheduled to begin in mid-1994. The facility will support a broad range of nuclear physics research, including topics such as how quarks and gluons are held together in protons and neutrons, the origins of the nuclear force, modifications of nucleons in the nuclear medium, and nuclear structure when nucleons are very close together. The status of the accelerator and its experimental equipment will be presented together with a sampling of experiments planned for the early phases of operation

  7. CEERI-CAT joint venture for development of accelerator magnetrons

    International Nuclear Information System (INIS)

    Prasad, Sharda; Kaushik, S.C.; Mahesh Kumar; Chaudhary, P.; Shrivastava, Purushottam; Wanmode, Y.; Hannurkar, P.R.

    2003-01-01

    LINAC and Microtron systems for electron acceleration up to few tens of MeV, requires pulsed RF sources such as magnetron and klystron in S-Band frequency range with peak power in the range of few MW. The major emphasis under this program was to develop critical technologies involved in the development of 2 MW magnetron. This paper discusses the development of 2 MW magnetron along with critical technologies involved and test facilities developed by CAT for testing of this magnetron

  8. Spectroscopic measurements of plasma emission light for plasma-based acceleration experiments

    International Nuclear Information System (INIS)

    Filippi, F.; Mostacci, A.; Palumbo, L.; Anania, M.P.; Biagioni, A.; Chiadroni, E.; Ferrario, M.; Cianchi, A.; Zigler, A.

    2016-01-01

    Advanced particle accelerators are based on the excitation of large amplitude plasma waves driven by either electron or laser beams. Future experiments scheduled at the SPARC-LAB test facility aim to demonstrate the acceleration of high brightness electron beams through the so-called resonant Plasma Wakefield Acceleration scheme in which a train of electron bunches (drivers) resonantly excites wakefields into a preformed hydrogen plasma; the last bunch (witness) injected at the proper accelerating phase gains energy from the wake. The quality of the accelerated beam depends strongly on plasma density and its distribution along the acceleration length. The measurements of plasma density of the order of 10 16 –10 17  cm −3 can be performed with spectroscopic measurements of the plasma-emitted light. The measured density distribution for hydrogen filled capillary discharge with both Balmer alpha and Balmer beta lines and shot-to-shot variation are here reported.

  9. Spectroscopic measurements of plasma emission light for plasma-based acceleration experiments

    Science.gov (United States)

    Filippi, F.; Anania, M. P.; Biagioni, A.; Chiadroni, E.; Cianchi, A.; Ferrario, M.; Mostacci, A.; Palumbo, L.; Zigler, A.

    2016-09-01

    Advanced particle accelerators are based on the excitation of large amplitude plasma waves driven by either electron or laser beams. Future experiments scheduled at the SPARC_LAB test facility aim to demonstrate the acceleration of high brightness electron beams through the so-called resonant Plasma Wakefield Acceleration scheme in which a train of electron bunches (drivers) resonantly excites wakefields into a preformed hydrogen plasma; the last bunch (witness) injected at the proper accelerating phase gains energy from the wake. The quality of the accelerated beam depends strongly on plasma density and its distribution along the acceleration length. The measurements of plasma density of the order of 1016-1017 cm-3 can be performed with spectroscopic measurements of the plasma-emitted light. The measured density distribution for hydrogen filled capillary discharge with both Balmer alpha and Balmer beta lines and shot-to-shot variation are here reported.

  10. Maintaining a technology-neutral approach to hydrogen production process development through conceptual design of the next generation nuclear plant - HTR2008-58191

    International Nuclear Information System (INIS)

    Patterson, M. W.; Park, C. V.

    2008-01-01

    The Energy Policy Act of 2005 (EPAct) charges the Dept. of Energy (DOE) with developing and demonstrating the technical and economic feasibility of using high temperature gas-cooled reactor (HTGR) technology for the production of electricity and/or hydrogen. The design, construction and demonstration of this technology in an HTGR proto-type reactor are termed the Next Generation Nuclear Plant (NGNP) Project. Currently, parallel development of three hydrogen production processes will continue until a single process technology is recommended for final demonstration in the NGNP - a technology neutral approach. This analysis compares the technology neutral approach to acceleration of the hydrogen process down-selection at the completion of the NGNP conceptual design to improve integration of the hydrogen process development and NGNP Project schedule. The accelerated schedule activities are based on completing evaluations and achieving technology readiness levels (TRLs) identified in NGNP systems engineering and technology road-maps. The cost impact of accelerating the schedule and risk reduction strategies was also evaluated. The NGNP Project intends to design and construct a component test facility (CTF) to support testing and demonstration of HTGR technologies, including those for hydrogen production. The demonstrations will support scheduled design and licensing activities, leading to subsequent construction and operation of the NGNP. Demonstrations in the CTF are expected to start about two years earlier than similarly scaled hydrogen demonstrations planned in the technology neutral baseline. The schedule evaluation assumed that hydrogen process testing would be performed in the CTF and synchronized the progression of hydrogen process development with CTF availability. (authors)

  11. The development for C-band whole sealed vacuum accelerating tuber

    International Nuclear Information System (INIS)

    Zhou Wenzhen; Zhang Xiangyang; Ding Shulin; Hu Jinquan; Yang Zhenyuan

    1999-01-01

    S-Band standing wave electron linacs have got wide-ranging application for industry nondestructive testing and formed varied kinds of products. X-band electron linac for NDT has been developed by Schonberg Company USA in 1985. Because of bigger structure of S-band linac and difficult machining of X-Band linac, an C-band portable linac for NDT has been developed in CIAE at present, a whole sealed vacuum accelerating tuber will be given here. It consists of 4 cavities, the phase velocity of the first two cavities is 0.5 and 0.9, respectively, and that of the second two cavities is 1. The high power testing proved that the design of the accelerating tuber is good for 1.5 MeV electron linac for NDT

  12. Research and development activities around the EUROTRANS accelerator for ADS applications

    International Nuclear Information System (INIS)

    Biarrotte, J. L.; Mueller, A. C.

    2007-01-01

    An Accelerator Driven System (ADS) for transmutation of nuclear waste typically requires a 600 MeV - 1 GeV accelerator delivering a proton flux of a few mAs for demonstrators, and of a few tens of mAs for large industrial systems. Such a machine belongs to the category of the high power proton accelerators, with an additional requirement for exceptional 'reliability': because of the induced thermal stress to the subcritical core, the number of unwanted 'beam-trips' should not exceed a few per year, a specification that is several orders of magnitude above usual performance. This paper briefly describes the reference solution adopted for such a machine, based on a linear superconducting accelerator, and presents the status of the Research and Development performed in this context. This work is performed within the 6th Framework Program EC project 'EUROTRANS' (EC Contract No: FI6W 516520, 'EUROTRANS')

  13. Spent nuclear fuel project integrated schedule plan

    International Nuclear Information System (INIS)

    Squires, K.G.

    1995-01-01

    The Spent Nuclear Fuel Integrated Schedule Plan establishes the organizational responsibilities, rules for developing, maintain and status of the SNF integrated schedule, and an implementation plan for the integrated schedule. The mission of the SNFP on the Hanford site is to provide safe, economic, environmentally sound management of Hanford SNF in a manner which stages it to final disposition. This particularly involves K Basin fuel

  14. Spent nuclear fuel project integrated schedule plan

    Energy Technology Data Exchange (ETDEWEB)

    Squires, K.G.

    1995-03-06

    The Spent Nuclear Fuel Integrated Schedule Plan establishes the organizational responsibilities, rules for developing, maintain and status of the SNF integrated schedule, and an implementation plan for the integrated schedule. The mission of the SNFP on the Hanford site is to provide safe, economic, environmentally sound management of Hanford SNF in a manner which stages it to final disposition. This particularly involves K Basin fuel.

  15. Development of superconducting acceleration cavity technology for free electron lasers

    International Nuclear Information System (INIS)

    Lee, Jong Min; Lee, Byung Cheol; Kim, Sun Kook; Jeong, Young Uk; Cho, Sung Oh

    2000-10-01

    As a result of the cooperative research between the KAERI and Peking University, the key technologies of superconducting acceleration cavity and photoelectron gun have been developed for the application to high power free electron lasers. A 1.5-GHz, 1-cell superconducting RF cavity has been designed and fabricated by using pure Nb sheets. The unloaded Q values of the fabricated superconducting cavity has been measured to be 2x10 9 at 2.5K, and 8x10 9 at 1.8K. The maximum acceleration gradient achieved was 12 MeV/m at 2.5K, and 20MV/m at 1.8 K. A cryostat for the 1-cell superconducting cavity has been designed. As a source of electron beam, a DC photocathode electron gun has been designed and fabricated, which is composed of a photocathode evaporation chamber and a 100-keV acceleration chamber. The efficiency of the Cs2Te photocathode is 3% nominally at room temperature, 10% at 290 deg C. The superconducting photoelectron gun system developed has been estimated to be a good source of high-brightness electron beam for high-power free electron lasers

  16. Development of superconducting acceleration cavity technology for free electron lasers

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Jong Min; Lee, Byung Cheol; Kim, Sun Kook; Jeong, Young Uk; Cho, Sung Oh

    2000-10-01

    As a result of the cooperative research between the KAERI and Peking University, the key technologies of superconducting acceleration cavity and photoelectron gun have been developed for the application to high power free electron lasers. A 1.5-GHz, 1-cell superconducting RF cavity has been designed and fabricated by using pure Nb sheets. The unloaded Q values of the fabricated superconducting cavity has been measured to be 2x10{sup 9} at 2.5K, and 8x10{sup 9} at 1.8K. The maximum acceleration gradient achieved was 12 MeV/m at 2.5K, and 20MV/m at 1.8 K. A cryostat for the 1-cell superconducting cavity has been designed. As a source of electron beam, a DC photocathode electron gun has been designed and fabricated, which is composed of a photocathode evaporation chamber and a 100-keV acceleration chamber. The efficiency of the Cs2Te photocathode is 3% nominally at room temperature, 10% at 290 deg C. The superconducting photoelectron gun system developed has been estimated to be a good source of high-brightness electron beam for high-power free electron lasers.

  17. Automated scheduling and planning from theory to practice

    CERN Document Server

    Ozcan, Ender; Urquhart, Neil

    2013-01-01

      Solving scheduling problems has long presented a challenge for computer scientists and operations researchers. The field continues to expand as researchers and practitioners examine ever more challenging problems and develop automated methods capable of solving them. This book provides 11 case studies in automated scheduling, submitted by leading researchers from across the world. Each case study examines a challenging real-world problem by analysing the problem in detail before investigating how the problem may be solved using state of the art techniques.The areas covered include aircraft scheduling, microprocessor instruction scheduling, sports fixture scheduling, exam scheduling, personnel scheduling and production scheduling.  Problem solving methodologies covered include exact as well as (meta)heuristic approaches, such as local search techniques, linear programming, genetic algorithms and ant colony optimisation.The field of automated scheduling has the potential to impact many aspects of our lives...

  18. Proposed Brookhaven accelerator-based neutron generator

    International Nuclear Information System (INIS)

    Grand, P.; Batchelor, K.; Chasman, R.; Rheaume, R.

    1976-01-01

    The d-Li Neutron Source concept, which includes a high-current dueteron linac, is an outgrowth of attempts made to use the BNL, 200-MeV proton linac BLIP facility to do radiation damage studies. It included a 100 mA, 30-MeV deuteron linear accelerator and a fast-flowing liquid lithium jet as the target. The latest design is not very different, except that the current is now 200 mA and the linac energy has been raised to 35 MeV. Both parameters, were changed to optimize the effectiveness of the facility with respect to flux, experimental volume and match to 14 MeV neutron-radiation-damage effects. The proposed Brookhaven Accelerator-based Neutron Generator is described with particular emphasis on the linear accelerator. The proposed facility is a practical and efficient way of producing the intense, high energy neutron beams needed for CTR material studies. The accelerator and liquid-metal technologies are well proven, state-of-the-art technologies. The fact that no new technology is required guarantees the possibility of meeting construction schedules, and more importantly, guarantees a high level of operational reliability

  19. PBFA [Particle Beam Fusion Accelerator] II: The pulsed power characterization phase

    International Nuclear Information System (INIS)

    Martin, T.H.; Turman, B.N.; Goldstein, S.A.

    1987-01-01

    The Particle Beam Fusion Accelerator II, PBFA II, is now the largest pulsed power device in operation. This paper summarizes its first year and a half of operation for the Department of Energy (DOE) Inertial Confinement Fusion (ICF) program. Thirty-six separate modules provide 72 output pulses that combine to form a 100 TW output pulse at the accelerator center. PBFA II was successfully test fired for the first time on December 11, 1985. This test completed the construction phase (Phase 1) within the expected schedule and budget. The accelerator checkout phase then started (Phase 2). The first priority during checkout was to bring the Phase 1 subsystems into full operation. The accelerator was first tested to determine overall system performance. Next, subsystems that were not performing adequately were modified. The accelerator is now being used for ion diode studies. 32 refs

  20. Developments of electron accelerators for national economy in the AN SSSR SO IYaF

    International Nuclear Information System (INIS)

    Auslender, V.L.; Salimov, R.A.

    1979-01-01

    Described is the work aimed at developing ELV-type electrostatic electron accelerators with electron energies ranging from 0.4 to 1.5 MeV and an average beam current of up to 100 mA, and the ILU-6 electron linear accelerator with the energy from 0.5 to 2 MeV and an average beam current of up to 40 mA. To provide an output of a linearly scanned beam a special titanium window with dimension of 75 x 980 mm which provides transit of a current of up to 80 mA has been developed. To irradiate articles having a cylindrical shape two types of devices with a circular beam scanning have been developed. A device has been worked out for the output of concentrated beams into the atmosphere, in which the electron beam leaves the vacuum through a system of four ports having different diameters. Principles of operation and results of tests of these devices are briefly outlined. Examples of their application are given. More than ten tons of tubes have been irradiated on the ILU-6 accelerator to obtain thermal shrinkage, and this accelerator also served as the basis for developing a radiation sewage treatment plant. An annual economical effect is estimated at 2 million roubles per an accelerator

  1. Department of Accelerator Physics and Technology: Overview

    International Nuclear Information System (INIS)

    Pachan, M.

    1998-01-01

    (full text) In the context of general discussions concerning the activity of the Institute, it was important to look critically at current and future directions at the Department's activity. Attention is given to development of basic accelerator knowledge, realized at home and throughout international collaborations. Of importance is a steady improvement of metrological and experimental basis for accelerator research. Apart of this, some development tendencies were formulated during 1997, oriented to application fields of accelerators. As examples should be named: - medical applications: a) A serious effort was given to an idea of using the existing compact cyclotron C-30 as a source for creation of a diagnostic centre in Swierk. The proposition was formulated in contact with the Nuclear Medicine Department of the Medical Academy, and the ''Brodno'' General Hospital. In spite of declared medical interest in such an installation, the project was not approved, due to lack of proper financial support. b) Model measurements and verification of theoretical assumptions and calculations oriented on the design of a very short, high-gradiented acceleration structure for the low energy accelerator COLINE/1000 were done. This project will enable us to achieve ''source - isocentre distance'', of 1000 mm, instead of existing 800 mm. This is important for therapy. In 1998, this work will be supported by the State Committee for Scientific Research. c) Preliminary discussions, and design approach were undertaken in collaboration with the Centre of Oncology, for elaboration of a movable low-energy accelerator with electron beam output, matched to inter operational irradiation during surgical therapy of tumours. - applications in radiation technology: Comparison of isotope and machine radiation sources indicates that, under Polish conditions it is reasonable to use purpose-oriented high power accelerators. The working group composed of specialists from IChTJ and IPJ prepared the

  2. Request-Driven Schedule Automation for the Deep Space Network

    Science.gov (United States)

    Johnston, Mark D.; Tran, Daniel; Arroyo, Belinda; Call, Jared; Mercado, Marisol

    2010-01-01

    The DSN Scheduling Engine (DSE) has been developed to increase the level of automated scheduling support available to users of NASA s Deep Space Network (DSN). We have adopted a request-driven approach to DSN scheduling, in contrast to the activity-oriented approach used up to now. Scheduling requests allow users to declaratively specify patterns and conditions on their DSN service allocations, including timing, resource requirements, gaps, overlaps, time linkages among services, repetition, priorities, and a wide range of additional factors and preferences. The DSE incorporates a model of the key constraints and preferences of the DSN scheduling domain, along with algorithms to expand scheduling requests into valid resource allocations, to resolve schedule conflicts, and to repair unsatisfied requests. We use time-bounded systematic search with constraint relaxation to return nearby solutions if exact ones cannot be found, where the relaxation options and order are under user control. To explore the usability aspects of our approach we have developed a graphical user interface incorporating some crucial features to make it easier to work with complex scheduling requests. Among these are: progressive revelation of relevant detail, immediate propagation and visual feedback from a user s decisions, and a meeting calendar metaphor for repeated patterns of requests. Even as a prototype, the DSE has been deployed and adopted as the initial step in building the operational DSN schedule, thus representing an important initial validation of our overall approach. The DSE is a core element of the DSN Service Scheduling Software (S(sup 3)), a web-based collaborative scheduling system now under development for deployment to all DSN users.

  3. Acceleration, rythms and school trajectory: developing acamemic talent

    Directory of Open Access Journals (Sweden)

    Zenita C. Guenther

    2009-12-01

    Full Text Available The distribution of the school work into a serial sequence of interlocked years install negative conditions to learning, and everyday living, for students with intellectual ability and level of achievement higher than their peer group. Acceleration is a way to advance these students through school curriculum is less time than required, without submitting them to the minimum age limits established by school systems. The big conundrum is that although it is one of the most studied themes is both, Education and Gifted Education, the results of such research do not have an impact in the educational practice, still marked by strong resistance within the school milieu. This article discuss acceleration as a measure to develop academic talent, also the expression of intelligence as an ability domain most and perhaps better studied, in the area of giftedness and talent.

  4. Instructions, multiple schedules, and extinction: Distinguishing rule-governed from schedule-controlled behavior.

    Science.gov (United States)

    Hayes, S C; Brownstein, A J; Haas, J R; Greenway, D E

    1986-09-01

    Schedule sensitivity has usually been examined either through a multiple schedule or through changes in schedules after steady-state responding has been established. This study compared the effects of these two procedures when various instructions were given. Fifty-five college students responded in two 32-min sessions under a multiple fixed-ratio 18/differential-reinforcement-of-low-rate 6-s schedule, followed by one session of extinction. Some subjects received no instructions regarding the appropriate rates of responding, whereas others received instructions to respond slowly, rapidly, or both. Relative to the schedule in operation, the instructions were minimal, partially inaccurate, or accurate. When there was little schedule sensitivity in the multiple schedule, there was little in extinction. When apparently schedule-sensitive responding occurred in the multiple schedule, however, sensitivity in extinction occurred only if differential responding in the multiple schedule could not be due to rules supplied by the experimenter. This evidence shows that rule-governed behavior that occurs in the form of schedule-sensitive behavior may not in fact become schedule-sensitive even though it makes contact with the scheduled reinforcers.

  5. CMS multicore scheduling strategy

    International Nuclear Information System (INIS)

    Yzquierdo, Antonio Pérez-Calero; Hernández, Jose; Holzman, Burt; Majewski, Krista; McCrea, Alison

    2014-01-01

    In the next years, processor architectures based on much larger numbers of cores will be most likely the model to continue 'Moore's Law' style throughput gains. This not only results in many more jobs in parallel running the LHC Run 1 era monolithic applications, but also the memory requirements of these processes push the workernode architectures to the limit. One solution is parallelizing the application itself, through forking and memory sharing or through threaded frameworks. CMS is following all of these approaches and has a comprehensive strategy to schedule multicore jobs on the GRID based on the glideinWMS submission infrastructure. The main component of the scheduling strategy, a pilot-based model with dynamic partitioning of resources that allows the transition to multicore or whole-node scheduling without disallowing the use of single-core jobs, is described. This contribution also presents the experiences made with the proposed multicore scheduling schema and gives an outlook of further developments working towards the restart of the LHC in 2015.

  6. The ATOMKI Accelerator Center

    International Nuclear Information System (INIS)

    Biri, S.; Kormany, Z.; Berzi, I.; Hunyadi, M.

    2009-01-01

    In 2009 a new division was established in our institute: the ATOMKI Accelerator Center (AAC). Before this time the facilities and staff of AAC belonged to other departments of the institute. The re-organization however, was necessary. It was understood that the translocation of all the accelerators into a centralized unit is advantageous in numerous fields. Here we just mention some of them. The submission of any instrumentation type proposal (EU or domestic) will be easier and has a higher chance to be supported. The organization and distribution of the beamtimes will be more equal and optimal. The usage of the maintenance and spare tools can became better and cheaper. The operating staff (cca. 20 person) can serve at more than one accelerator and the teams can help each other. The accelerator center actually became a fourth new basic unit of the institute besides the three traditional scientific divisions (see the Atomki homepage for the organization chart). The following six main facilities belong to the accelerator center: Cyclotron; VdG-5 accelerator; VdG-1 accelerator; ECR ion source; Isotope separator; Tandetron (under installation). In figure 1 the placements of these machines are shown in an artistic 3D map of the Atomki. The table 1 summarizes the main parameters of the accelerators. More detailed technical specification of the machines can be found in the new homepage of the center. In 2009 all the accelerators operated as scheduled, safely and without major breakdowns. After the experiences in the first months it can be concluded that the new center works well both for technical and human point of views. In the next sub-chapters the 2009 operation and development details of the individual accelerators are summarized. Cyclotron operation. The operation of the cyclotron in 2009 was concentrated to the usual 9 months; January, July and August were reserved for maintenance and holidays. The overall working time of the accelerator was 2009 hours; the time

  7. Precision siting of a particle accelerator

    International Nuclear Information System (INIS)

    Cintra, Jorge Pimentel

    1996-01-01

    Precise location is a specific survey job that involves a high skilled work to avoid unrecoverable results at the project installation. As a function of the different process stages, different specifications can be applied, invoking different instruments: theodolite, measurement tape, distanciometer, invar wire. This paper, based on experience obtained at the installation of particle accelerator equipment, deals with general principles of precise location: tolerance definitions, increasing accuracy techniques, schedule of locations, sensitivity analysis, quality control methods. (author)

  8. Technology for planning and scheduling under complex constraints

    Science.gov (United States)

    Alguire, Karen M.; Pedro Gomes, Carla O.

    1997-02-01

    Within the context of law enforcement, several problems fall into the category of planning and scheduling under constraints. Examples include resource and personnel scheduling, and court scheduling. In the case of court scheduling, a schedule must be generated considering available resources, e.g., court rooms and personnel. Additionally, there are constraints on individual court cases, e.g., temporal and spatial, and between different cases, e.g., precedence. Finally, there are overall objectives that the schedule should satisfy such as timely processing of cases and optimal use of court facilities. Manually generating a schedule that satisfies all of the constraints is a very time consuming task. As the number of court cases and constraints increases, this becomes increasingly harder to handle without the assistance of automatic scheduling techniques. This paper describes artificial intelligence (AI) technology that has been used to develop several high performance scheduling applications including a military transportation scheduler, a military in-theater airlift scheduler, and a nuclear power plant outage scheduler. We discuss possible law enforcement applications where we feel the same technology could provide long-term benefits to law enforcement agencies and their operations personnel.

  9. Post LS1 schedule

    CERN Document Server

    Lamont, M

    2014-01-01

    The scheduling limits for a typical long year taking into account technical stops, machine development, spe- cial physics runs are presented. An attempt is then made to outline a ten year post LS1 schedule taking into account the disparate requirements outlined in the previous talks in this session. The demands on the planned long shutdowns and the impact of these demands on their proposed length will be discussed. The option of using ion running as a pre-shutdown cool-down period will be addressed.

  10. Distributed Research Project Scheduling Based on Multi-Agent Methods

    Directory of Open Access Journals (Sweden)

    Constanta Nicoleta Bodea

    2011-01-01

    Full Text Available Different project planning and scheduling approaches have been developed. The Operational Research (OR provides two major planning techniques: CPM (Critical Path Method and PERT (Program Evaluation and Review Technique. Due to projects complexity and difficulty to use classical methods, new approaches were developed. Artificial Intelligence (AI initially promoted the automatic planner concept, but model-based planning and scheduling methods emerged later on. The paper adresses the project scheduling optimization problem, when projects are seen as Complex Adaptive Systems (CAS. Taken into consideration two different approaches for project scheduling optimization: TCPSP (Time- Constrained Project Scheduling and RCPSP (Resource-Constrained Project Scheduling, the paper focuses on a multiagent implementation in MATLAB for TCSP. Using the research project as a case study, the paper includes a comparison between two multi-agent methods: Genetic Algorithm (GA and Ant Colony Algorithm (ACO.

  11. Schedules of Controlled Substances: Temporary Placement of 4-Fluoroisobutyryl Fentanyl into Schedule I. Temporary scheduling order.

    Science.gov (United States)

    2017-05-03

    The Administrator of the Drug Enforcement Administration is issuing this temporary scheduling order to schedule the synthetic opioid, N-(4-fluorophenyl)-N-(1-phenethylpiperidin-4-yl)isobutyramide (4-fluoroisobutyryl fentanyl or para-fluoroisobutyryl fentanyl), and its isomers, esters, ethers, salts and salts of isomers, esters, and ethers, into schedule I pursuant to the temporary scheduling provisions of the Controlled Substances Act. This action is based on a finding by the Administrator that the placement of 4-fluoroisobutyryl fentanyl into schedule I of the Controlled Substances Act is necessary to avoid an imminent hazard to the public safety. As a result of this order, the regulatory controls and administrative, civil, and criminal sanctions applicable to schedule I controlled substances will be imposed on persons who handle (manufacture, distribute, reverse distribute, import, export, engage in research, conduct instructional activities or chemical analysis, or possess), or propose to handle, 4-fluoroisobutyryl fentanyl.

  12. Scheduling techniques in the Request Oriented Scheduling Engine (ROSE)

    Science.gov (United States)

    Zoch, David R.

    1991-01-01

    Scheduling techniques in the ROSE are presented in the form of the viewgraphs. The following subject areas are covered: agenda; ROSE summary and history; NCC-ROSE task goals; accomplishments; ROSE timeline manager; scheduling concerns; current and ROSE approaches; initial scheduling; BFSSE overview and example; and summary.

  13. Annual report of Department of Research Reactor and Tandem Accelerator, JFY2012. Operation, utilization and technical development of JRR-3, JRR-4, NSRR, Tandem Accelerator and RI Production Facility

    International Nuclear Information System (INIS)

    Murayama, Yoji; Ishii, Tetsuro; Nakamura, Kiyoshi; Uno, Yuki; Ishikuro, Yasuhiro; Kawashima, Kazuhito; Ishizaki, Nobuhiro; Matsumura, Taichi; Nagahori, Kazuhisa; Odauchi, Shouji; Maruo, Takeshi

    2014-03-01

    The Department of Research Reactor and Tandem Accelerator is in charge of the operation, utilization and technical development of JRR-3(Japan Research Reactor No.3), JRR-4(Japan Research Reactor No.4), NSRR(Nuclear Safety Research Reactor), Tandem Accelerator and RI Production Facility. This annual report describes a summary of activities of services and technical developments carried out in the period between April 1, 2012 and March 31, 2013. The activities were categorized into five service/development fields: (1) Operation and maintenance of research reactors and tandem accelerator, (2) Utilization of research reactors and tandem accelerator, (3) Upgrading of utilization techniques of research reactors and tandem accelerator, (4) Safety administration for department of research reactor and tandem accelerator, (5) International cooperation. Also contained are lists of publications, meetings, granted permissions on laws and regulations concerning atomic energy, number of staff members dispatched to Fukushima for the technical assistance, outcomes in service and technical developments and so on. (author)

  14. Analysis and Optimisation of Hierarchically Scheduled Multiprocessor Embedded Systems

    DEFF Research Database (Denmark)

    Pop, Traian; Pop, Paul; Eles, Petru

    2008-01-01

    We present an approach to the analysis and optimisation of heterogeneous multiprocessor embedded systems. The systems are heterogeneous not only in terms of hardware components, but also in terms of communication protocols and scheduling policies. When several scheduling policies share a resource......, they are organised in a hierarchy. In this paper, we first develop a holistic scheduling and schedulability analysis that determines the timing properties of a hierarchically scheduled system. Second, we address design problems that are characteristic to such hierarchically scheduled systems: assignment...... of scheduling policies to tasks, mapping of tasks to hardware components, and the scheduling of the activities. We also present several algorithms for solving these problems. Our heuristics are able to find schedulable implementations under limited resources, achieving an efficient utilisation of the system...

  15. U.S. advanced accelerator applications program: plans to develop and test waste transmutation technologies

    International Nuclear Information System (INIS)

    Van Tuyle, G.; Bennett, D.; Arthur, E.; Cappiello, M.; Finck, P.; Hill, D.; Herczeg, J.; Goldner, F.

    2001-01-01

    The primary mission of the U.S. Advanced Accelerator Applications (AAA) Program is to establish a national nuclear technology research capability that can demonstrate accelerator-based transmutation of waste and conduct transmutation research while at the same time providing a capability for the production of tritium if required. The AAA Program was created during fiscal year 2001 from the Accelerator Transmutation of Waste (ATW) Program and the Accelerator Production of Tritium (APT) Project. This paper describes the new AAA Program, as well as its two major components: development and testing of waste transmutation technologies and construction of an integrated accelerator-driven test facility (ADTF). (author)

  16. Ultrahigh impedance method to assess electrostatic accelerator performance

    Directory of Open Access Journals (Sweden)

    Nikolai R. Lobanov

    2015-06-01

    Full Text Available This paper describes an investigation of problem-solving procedures to troubleshoot electrostatic accelerators. A novel technique to diagnose issues with high-voltage components is described. The main application of this technique is noninvasive testing of electrostatic accelerator high-voltage grading systems, measuring insulation resistance, or determining the volume and surface resistivity of insulation materials used in column posts and acceleration tubes. In addition, this technique allows verification of the continuity of the resistive divider assembly as a complete circuit, revealing if an electrical path exists between equipotential rings, resistors, tube electrodes, and column post-to-tube conductors. It is capable of identifying and locating a “microbreak” in a resistor and the experimental validation of the transfer function of the high impedance energy control element. A simple and practical fault-finding procedure has been developed based on fundamental principles. The experimental distributions of relative resistance deviations (ΔR/R for both accelerating tubes and posts were collected during five scheduled accelerator maintenance tank openings during 2013 and 2014. Components with measured ΔR/R>±2.5% were considered faulty and put through a detailed examination, with faults categorized. In total, thirty four unique fault categories were identified and most would not be identifiable without the new technique described. The most common failure mode was permanent and irreversible insulator current leakage that developed after being exposed to the ambient environment. As a result of efficient in situ troubleshooting and fault-elimination techniques, the maximum values of |ΔR/R| are kept below 2.5% at the conclusion of maintenance procedures. The acceptance margin could be narrowed even further by a factor of 2.5 by increasing the test voltage from 40 V up to 100 V. Based on experience over the last two years, resistor and

  17. Accelerated fermentation of cheese whey. Developing the system

    Energy Technology Data Exchange (ETDEWEB)

    Bechtle, R M; Claydon, T J

    1971-01-01

    A system for accelerated fermentation of cheese wheys requires a mixed yeast and lactose-fermenting bacterial culture. The air flow required (110 ml/min/1./1% of lactose) was proportional to the concentration of wheys in the media. Yeast cell-mass production by accelerated fermentation was equal to or greater than the whey concentration factor when compared with yeast production of single yeast strain production on unconcentrated wheys. Generally, on triple strength wheys, yeast production was approximately 1 lb/gallon of medium. Fermentation media formulas were developed with whey analysis, shake culture, and fermentor trials. The formula used with a specific whey must be adequate to supplement the mineral deficiencies in the whey and to provide trace elements and nutrients essential for maximum microbial growth. High-rate aeration was required for both respiration of the microbial culture and to purge the ferment of volatile metabolites, whose presence depressed microbial cell synthesis.

  18. Development of a high intensity proton accelerator

    International Nuclear Information System (INIS)

    Mizumoto, Motoharu; Kusano, Joichi; Hasegawa, Kazuo; Ito, Nobuo; Oguri, Hidetomo; Touchi, Yutaka; Mukugi, Ken; Ino, Hiroshi

    1997-01-01

    The high-intensity proton linear accelerator with a beam power of 15 MW has been proposed for various engineering tests for the nuclear waste transmutation system as one of the research plans in the Neutron Science Research Program (NSRP) in JAERI. High intensity proton beam and secondary particle beams such as neutron, pion, muon and unstable radio isotope (RI) beam generated from the proton spallation reaction will be utilized at these facilities in each research field. The R and D work has been carried out for the components of the front-end part of the proton accelerator; ion source, RFQ, DTL and RF source. In the beam test, the current of 70 mA with a duty factor of 7% has been accelerated from the RFQ at the energy of 2 MeV. A hot test model of the DTL for the high power and high duty operation was fabricated and tested. For the high energy portion above 100 MeV, superconducting accelerating cavity is studied as a main option. The superconducting linac is expected to have several favourable characteristics for high intensity accelerator such as short accelerator length, large bore radius resulting in low beam losses and cost effectiveness for construction and operation. A test stand with equipment of cryogenics system, vacuum system, RF system and cavity processing and cleaning is prepared to test the physics issues and fabrication process. The proposed plan for accelerator design and construction will compose of two consecutive stages. The first stage will be completed in about 7 years with the beam power of 1.5 MW. As the second stage gradual upgrading of the beam power will be made up to 15 MW. 7 refs., 3 figs., 4 tabs

  19. Model-based Acceleration Control of Turbofan Engines with a Hammerstein-Wiener Representation

    Science.gov (United States)

    Wang, Jiqiang; Ye, Zhifeng; Hu, Zhongzhi; Wu, Xin; Dimirovsky, Georgi; Yue, Hong

    2017-05-01

    Acceleration control of turbofan engines is conventionally designed through either schedule-based or acceleration-based approach. With the widespread acceptance of model-based design in aviation industry, it becomes necessary to investigate the issues associated with model-based design for acceleration control. In this paper, the challenges for implementing model-based acceleration control are explained; a novel Hammerstein-Wiener representation of engine models is introduced; based on the Hammerstein-Wiener model, a nonlinear generalized minimum variance type of optimal control law is derived; the feature of the proposed approach is that it does not require the inversion operation that usually upsets those nonlinear control techniques. The effectiveness of the proposed control design method is validated through a detailed numerical study.

  20. Development of an accelerated test for Internal Sulfate Attack study

    Directory of Open Access Journals (Sweden)

    Khelil Nacim

    2014-04-01

    Full Text Available Internal Sulfate Attack (ISA is a pathology that occurs under certain conditions in concrete having undergone heating above 70 °C at early age (through heating in pre-casting industry or due to hydration in large concrete parts. This reaction deemed very slow, numerous methods to speed up reactions leading to delayed ettringite formation have been developed. These methods are all based on the material damage. Another type of test is currently under development. It is based on rehabilitation techniques such as electrochemical chloride extraction (ECE in order to accelerate the leaching of alkalis that could be one of the triggers of the pathology. The study presented in this paper focused on concrete specimens prepared from cement (CEM I 52.5 N enriched with Na2SO4. These concretes have undergone a heat treatment typical of those used in precast plants (up to 24 hours with a maximum temperature of 80 °C. Various paths were explored for the development of the accelerated test. The first results showed that it was necessary to use a removable titanium anode ruthenium anode instead of stainless steel embedded in the concrete. Then tests with de-ionized water as the solute to the cathode did not accelerate the onset of expansions. The experiment has been modified and potassium carbonate was added to the solution. This modification didn’t show any significant improvement, and other experiments are being carried out to explain this result.

  1. Development of a tandem-electrostatic-quadrupole accelerator facility for BNCT

    International Nuclear Information System (INIS)

    Kreiner, A.J.; Thatar Vento, V.; Levinas, P.; Bergueiro, J.; Di Paolo, H.; Burlon, A.A.; Kesque, J.M.; Valda, A.A.; Debray, M.E.; Somacal, H.R.; Minsky, D.M.

    2009-01-01

    In this work we describe the present status of an ongoing project to develop a tandem-electrostatic-quadrupole (TESQ) accelerator facility for accelerator-based (AB) BNCT at the Atomic Energy Commission of Argentina in Buenos Aires. The project final goal is a machine capable of delivering 30 mA of 2.4 MeV protons to be used in conjunction with a neutron production target based on the 7 Li(p,n) 7 Be reaction slightly beyond its resonance at 2.25 MeV. These are the specifications needed to produce sufficiently intense and clean epithermal neutron beams, based on the 7 Li(p,n) 7 Be reaction, to perform BNCT treatment for deep-seated tumors in less than an hour. An electrostatic machine is the technologically simplest and cheapest solution for optimized AB-BNCT. The machine being designed and constructed is a folded TESQ with a high-voltage terminal at 1.2 MV intended to work in air. Such a machine is conceptually shown to be capable of transporting and accelerating a 30 mA proton beam to 2.4 MeV. The general geometric layout, its associated electrostatic fields, and the acceleration tube are simulated using a 3D finite element procedure. The design and construction of the ESQ modules is discussed and their electrostatic fields are investigated. Beam transport calculations through the accelerator are briefly mentioned. Likewise, work related to neutron production targets, strippers, beam shaping assembly and patient treatment room is briefly described.

  2. Development of a tandem-electrostatic-quadrupole accelerator facility for BNCT.

    Science.gov (United States)

    Kreiner, A J; Thatar Vento, V; Levinas, P; Bergueiro, J; Di Paolo, H; Burlon, A A; Kesque, J M; Valda, A A; Debray, M E; Somacal, H R; Minsky, D M; Estrada, L; Hazarabedian, A; Johann, F; Suarez Sandin, J C; Castell, W; Davidson, J; Davidson, M; Giboudot, Y; Repetto, M; Obligado, M; Nery, J P; Huck, H; Igarzabal, M; Fernandez Salares, A

    2009-07-01

    In this work we describe the present status of an ongoing project to develop a tandem-electrostatic-quadrupole (TESQ) accelerator facility for accelerator-based (AB) BNCT at the Atomic Energy Commission of Argentina in Buenos Aires. The project final goal is a machine capable of delivering 30 mA of 2.4 MeV protons to be used in conjunction with a neutron production target based on the (7)Li(p,n)(7)Be reaction slightly beyond its resonance at 2.25 MeV. These are the specifications needed to produce sufficiently intense and clean epithermal neutron beams, based on the (7)Li(p,n)(7)Be reaction, to perform BNCT treatment for deep-seated tumors in less than an hour. An electrostatic machine is the technologically simplest and cheapest solution for optimized AB-BNCT. The machine being designed and constructed is a folded TESQ with a high-voltage terminal at 1.2 MV intended to work in air. Such a machine is conceptually shown to be capable of transporting and accelerating a 30 mA proton beam to 2.4 MeV. The general geometric layout, its associated electrostatic fields, and the acceleration tube are simulated using a 3D finite element procedure. The design and construction of the ESQ modules is discussed and their electrostatic fields are investigated. Beam transport calculations through the accelerator are briefly mentioned. Likewise, work related to neutron production targets, strippers, beam shaping assembly and patient treatment room is briefly described.

  3. The role of titration schedule of topiramate for the development of depression in patients with epilepsy.

    Science.gov (United States)

    Mula, Marco; Hesdorffer, Dale C; Trimble, Michael; Sander, Josemir W

    2009-05-01

    To determine whether a fast titration schedule of topiramate (TPM) has different effects on the occurrence of depression, in relation to other risk factors for TPM-induced depression, including history of depression (HxDEP), febrile seizures (FS), and hippocampal sclerosis (HS). Using data from a large case registry of patients prescribed TPM, two models were constructed: Model 1 examined the independent effect of rapid TPM titration after separate adjustment for FS, HxDEP, and HS. Model 2 examined effect of the cooccurrence of rapid titration on the development of depression with each of these risk factors. A total of 423 patients were included (51.8% females), mean age (SD) 35.5 (11.8) years, mean duration of epilepsy of 22.2 (11.5) years. Forty-four patients (10.4%) developed depression during TPM therapy. A rapid TPM titration was associated with 5-fold increased risk of depression that increased to 12.7-fold in the presence of both FS and rapid TPM titration, 23.3-fold in the presence of both HxDEP and rapid TPM titration, and 7.6-fold in the presence of both HS and rapid TPM titration schedule. Our study suggests that a rapid titration schedule is associated with an increased risk of developing depression during TPM therapy. HxDEP and FS are major contraindications to the use of a rapid titration, with a 23.3-fold and 12.7 fold increased risk, respectively.

  4. Evolution and development of the Oak Ridge 25URC tandem accelerator control system

    International Nuclear Information System (INIS)

    Juras, R.C.; Ziegler, N.F.; Meigs, M.J.; McPherson, R.L.; Hoglund, D.E.; Biggerstaff, J.A.

    1987-01-01

    Since acceptance of the 25URC accelerator in 1982, we have continued to develop and improve both the accelerator control system and associated software. In this paper, we describe these improvements and also discuss how our experience with the present system would influence the architecture and design of future, similar systems

  5. Progress update on the low-energy demonstration accelerator (LEDA)

    International Nuclear Information System (INIS)

    Schneider, J.D.; Chan, K.C.D.

    1997-01-01

    As part of the linac design for the accelerator production of tritium (APT) project, the authors are assembling the first approximately 20 MeV portion of this cw proton accelerator. Primary objective of this low-energy demonstration accelerator (LEDA) is to verify the design codes, gain fabrication knowledge, understand LEDA's beam operation, and be able to better predict costs and operational availability for the full 1,700 MeV APT accelerator. This paper provides an updated report on this past year's progress that includes beam tests of the 75 keV injector, fabrication of the 6.7 MeV radio-frequency quadrupole (RFQ), preparation of the facility, procurement and assembly of the rf system, and detailed design and documentation of many pieces of support equipment. First tests with the 6.7 MeV, 100 mA, cw beam from the RFQ are scheduled for late 1998. References are given to many detailed papers on LEDA at this conference

  6. Comparison of four recombinant hepatitis B vaccines applied on an accelerated schedule in healthy adults.

    Science.gov (United States)

    Hernández-Bernal, Francisco; Aguilar-Betancourt, Arístides; Aljovin, Virginia; Arias, Gloria; Valenzuela, Carmen; de Alejo, Karen Pérez; Hernández, Karina; Oquendo, Orcilia; Figueredo, Niurka; Figueroa, Nelvis; Musacchio, Alexis; Véliz, Gloria; García, Elizeth; Mollineda, Alina D; Juvier, Ana Isabel; Trujillo, Janette; Delahanty, Aurora; Ortega, D; Cinza, Z; González, Verena L Muzio

    2011-10-01

    A post-marketing, double blind, randomised, controlled clinical trial to assess the immunogenicity and safety profiles of four commercially available recombinant hepatitis B vaccines was performed. The vaccines included in this study were Heberbiovac-HB (®) (Heber Biotec S.A., Havana, Cuba), Euvax-B (®) (LG Chemical Ltd., Seoul, Korea), Hepavax-Gene (®)   (Greencross Vaccine Corp., Seoul, Korea), and Engerix-B (®) (GlaxoSmithKline Biologicals, Rixensart, Belgium). Vaccines were administered intramuscularly to healthy adults in three 20mg doses at monthly intervals (0 - 1 -  2 months). Four hundred volunteers aged 18 to 45 years (average age, 35 years) non-reactive for serological markers of hepatitis B virus infection were vaccinated. Volunteers were randomly assigned (ratio 1:1:1:1) to one of the four treatment groups. The antibody response (anti-HBs) was assessed at days 60, 90 and 365 post-vaccination using a commercial kit. The four vaccines showed to be safe and highly immunogenic. Similar seroprotection rates (anti-HBs ≥10 IU/L) about one month after application of the second and third dose were obtained for Engerix-B (®) , Hepavax-Gene (®) , Euvax-B (®) , and Heberbiovac-HB (®) vaccines 96.7%, 96.6%, 100%, 100% and 98.8%, 89.5%, 100%, 100%, respectively.. Heberbiovac-HB (®) vaccine achieved significantly higher geometric mean antibody titers (GMT) and rate of good and  hyper-responders at all time-points post-vaccination. The GMT on day 365 after full vaccination was significantly reduced in all groups compared to day 90, although Heberbiovac-HB (®) showed the highest anti-HBs GMT and good-responders rate. The four vaccines were well tolerated and poorly reactogenic. No serious adverse events were observed. This study confirms an overall good immune response and rapid priming for the  four vaccines in the course of an accelerated schedule, with higher anti-HBs geometric mean concentrations and better responses for Heberbiovac-HB (®) . [WHO

  7. 28th Linear Accelerator Conference

    CERN Document Server

    Facco, Alberto; McCausey, Amy; Schaa, Volker R W

    2017-01-01

    The 28th Linear Accelerator Conference, LINAC 16, to take place at the Kellogg Hotel and Conference Center in East Lansing, Michigan, on 25-30 September 2016. This conference is the main bi-yearly gathering for the world-wide community of linac specialists. It provides a unique opportunity to hear about the latest advances of projects and developments concerning hadron and lepton linacs, and their applications. In the tradition of previous LINAC conferences, plenary sessions including invited speakers are scheduled every day. Poster sessions will be held on Monday, Tuesday and Thursday afternoons. There will also be two special events on Sunday, 25 September 2016, namely a student poster session and an evening reception for registrants and their companions at the Kellogg Hotel and Conference Center. Participants are also warmly invited to join an outing to Lake Michigan and the beautiful surroundings on Wednesday afternoon, and to visit the Facility for Rare Isotope Beams on Friday afternoon, after the formal...

  8. Intense pulsed neutron source accelerator status

    International Nuclear Information System (INIS)

    Potts, C.W.; Brumwell, F.R.; Stipp, V.F.

    1983-01-01

    The Intense Pulsed Neutron Source (IPNS) facility has been in operation since November 1, 1981. From that date through August 1, 1983, the accelerator system was scheduled for 7191 hours of operation. During this period, 627 million pulses totaling about 1.1 x 10 21 protons were delivered to the spallation target. The accelerator has exceeded goals set in 1981 by averaging 8.65 μA over this two year period. This average beam current, while modest by the standards of proposed machines, makes the IPNS synchrotron (Rapid Cycling Synchrotron [RCS]) the highest intensity proton synchrotron in the world today. Detailed data on accelerator operation are presented. Weekly average currents of 12 μA have been achieved along with peaks of 13.9 μA. A great deal has been learned about the required operating constraints during high beam current operation. It should be possible to increase the average beam current during this next year to 12 μA while observing these restraints. Improvement plans have been formulated to increase the beam current to 16 μA over the next three years

  9. DEVELOPMENT OF GENETIC ALGORITHM-BASED METHODOLOGY FOR SCHEDULING OF MOBILE ROBOTS

    DEFF Research Database (Denmark)

    Dang, Vinh Quang

    problem is to minimize the total traveling time of the single mobile robot and thereby increase its availability. For the second scheduling problem, a fleet of mobile robots is considered together with a set of machines to carry out different types of tasks, e.g. pre-assembly or quality inspection. Some...... problem and finding optimal solutions for each one. However, the formulated mathematical models could only be applicable to small-scale problems in practice due to the significant increase of computation time as the problem size grows. Note that making schedules of mobile robots is part of real-time....... For the first scheduling problem, a single mobile robot is considered to collect and transport container of parts and empty them into machine feeders where needed. A limit on carrying capacity of the single mobile robot and hard time windows of part-feeding tasks are considered. The objective of the first...

  10. Development of a fast voltage control method for electrostatic accelerators

    International Nuclear Information System (INIS)

    Lobanov, Nikolai R.; Linardakis, Peter; Tsifakis, Dimitrios

    2014-01-01

    The concept of a novel fast voltage control loop for tandem electrostatic accelerators is described. This control loop utilises high-frequency components of the ion beam current intercepted by the image slits to generate a correction voltage that is applied to the first few gaps of the low- and high-energy acceleration tubes adjoining the high voltage terminal. New techniques for the direct measurement of the transfer function of an ultra-high impedance structure, such as an electrostatic accelerator, have been developed. For the first time, the transfer function for the fast feedback loop has been measured directly. Slow voltage variations are stabilised with common corona control loop and the relationship between transfer functions for the slow and new fast control loops required for optimum operation is discussed. The main source of terminal voltage instabilities, which are due to variation of the charging current caused by mechanical oscillations of charging chains, has been analysed

  11. Illinois Accelerator Research Center

    Science.gov (United States)

    Kroc, Thomas K.; Cooper, Charlie A.

    The Illinois Accelerator Research Center (IARC) hosts a new accelerator development program at Fermi National Accelerator Laboratory. IARC provides access to Fermi's state-of-the-art facilities and technologies for research, development and industrialization of particle accelerator technology. In addition to facilitating access to available existing Fermi infrastructure, the IARC Campus has a dedicated 36,000 ft2 Heavy Assembly Building (HAB) with all the infrastructure needed to develop, commission and operate new accelerators. Connected to the HAB is a 47,000 ft2 Office, Technology and Engineering (OTE) building, paid for by the state, that has office, meeting, and light technical space. The OTE building, which contains the Accelerator Physics Center, and nearby Accelerator and Technical divisions provide IARC collaborators with unique access to world class expertise in a wide array of accelerator technologies. At IARC scientists and engineers from Fermilab and academia work side by side with industrial partners to develop breakthroughs in accelerator science and translate them into applications for the nation's health, wealth and security.

  12. 2007 Wholesale Power Rate Schedules : 2007 General Rate Schedule Provisions.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    2006-11-01

    This schedule is available for the contract purchase of Firm Power to be used within the Pacific Northwest (PNW). Priority Firm (PF) Power may be purchased by public bodies, cooperatives, and Federal agencies for resale to ultimate consumers, for direct consumption, and for Construction, Test and Start-Up, and Station Service. Rates in this schedule are in effect beginning October 1, 2006, and apply to purchases under requirements Firm Power sales contracts for a three-year period. The Slice Product is only available for public bodies and cooperatives who have signed Slice contracts for the FY 2002-2011 period. Utilities participating in the Residential Exchange Program (REP) under Section 5(c) of the Northwest Power Act may purchase Priority Firm Power pursuant to the Residential Exchange Program. Rates under contracts that contain charges that escalate based on BPA's Priority Firm Power rates shall be based on the three-year rates listed in this rate schedule in addition to applicable transmission charges. This rate schedule supersedes the PF-02 rate schedule, which went into effect October 1, 2001. Sales under the PF-07 rate schedule are subject to BPA's 2007 General Rate Schedule Provisions (2007 GRSPs). Products available under this rate schedule are defined in the 2007 GRSPs. For sales under this rate schedule, bills shall be rendered and payments due pursuant to BPA's 2007 GRSPs and billing process.

  13. Underground storage tank - Integrated Demonstration Technical Task Plan master schedule

    International Nuclear Information System (INIS)

    Johnson, C.M.

    1994-08-01

    This document provides an integrated programmatic schedule (i.e., Master Schedule) for the U.S. Department of Energy (DOE) Underground Storage Tank-Integrated Demonstration (UST-ID) Program. It includes top-level schedule and related information for the DOE Office of Technology Development (EM-50) UST-ID activities. The information is based upon the fiscal year (FY) 1994 technical task plans (TTPS) and has been prepared as a baseline information resource for program participants. The Master Schedule contains Level 0 and Level 1 program schedules for the UST-ID Program. This document is one of a number of programmatic documents developed to support and manage the UST-ID activities. It is composed of the following sections: Program Overview - provides a summary background of the UST-ID Program. This summary addresses the mission, scope, and organizational structure of the program; Activity Description - provides a programmatic description of UST-ID technology development activities and lists the key milestones for the UST-ID systems. Master Schedules - contains the Level 0 and Level 1 programmatic schedules for the UST-ID systems. References - lists the UST-ID programmatic documents used as a basis for preparing the Master Schedule. The appendixes contain additional details related to site-specific technology applications

  14. Project management with dynamic scheduling baseline scheduling, risk analysis and project control

    CERN Document Server

    Vanhoucke, Mario

    2013-01-01

    The topic of this book is known as dynamic scheduling, and is used to refer to three dimensions of project management and scheduling: the construction of a baseline schedule and the analysis of a project schedule's risk as preparation of the project control phase during project progress. This dynamic scheduling point of view implicitly assumes that the usability of a project's baseline schedule is rather limited and only acts as a point of reference in the project life cycle.

  15. Engineering research and development for the Elise Heavy Ion Induction Accelerator

    International Nuclear Information System (INIS)

    Reginato, L.; Peters, C.

    1995-08-01

    The Fusion Energy Research engineering team has been conducting Research and Development Associated with the Construction (RDAC) of the Elise accelerator since the approval of Key Decision one (KD1 is start of construction). The engineering design effort has worked in close cooperation with the physics design staff to achieve all parameters of the Elise accelerator. The design included the 2 MV injector, matching section, combiner, induction cells, electric/magnetic quadrupoles, alignment system and controls. All major designs and some hardware testing will be discussed

  16. Engineering research and development for the Elise heavy ion induction accelerator

    International Nuclear Information System (INIS)

    Reginato, L.; Peters, C.

    1996-01-01

    The fusion energy research engineering team has been conducting research and development associated with the construction of the Elise accelerator since the approval of key decision 1 (this is the start of construction). The engineering design effort has worked in close cooperation with the physics design staff to achieve all parameters of the Elise accelerator. The design included the 2 MV injector, matching section, combiner, induction cells, electric-magnetic quadrupoles, alignment system and controls. All major designs and some hardware testing will be discussed. (orig.)

  17. Theoretical Investigations of Plasma-Based Accelerators and Other Advanced Accelerator Concepts

    International Nuclear Information System (INIS)

    Shuets, G.

    2004-01-01

    Theoretical investigations of plasma-based accelerators and other advanced accelerator concepts. The focus of the work was on the development of plasma based and structure based accelerating concepts, including laser-plasma, plasma channel, and microwave driven plasma accelerators

  18. Trial lectures for accelerator operators in SPring-8

    International Nuclear Information System (INIS)

    Ohshima, T.

    2004-01-01

    In case of the SPring-8, accelerator operators are working in three shifts of eight hours. They are making the scheduled beam injection to the storage ring, routine measurements of beam parameters such as the COD, the betatron tunes, the bunch current of stored beam and so on. They are keeping watch on operational state every time. In case of something wrong, they will take measures to meet the situation. Newcomer of operator works with an experienced one to learn sequence of the beam injection, how to operate Graphical User Interface and (GUI) so on. In addition, we organise preliminary lectures on accelerator for operators. Topics done in the lectures are RF system, vacuum system, magnet system, monitors, beam diagnostics, accelerator and beamline control system etc. The contents of the lecture can be seen through web browser again and again. It is useful for operators to understand the SPring-8 facility and details of their work because some of them are not familiar with the accelerator field before being an operator of SPring-8. (author)

  19. A novel schedule of accelerated partial breast radiation using intensity-modulated radiation therapy in elderly patients: survival and toxicity analysis of a prospective clinical trial

    Energy Technology Data Exchange (ETDEWEB)

    Sayan, Mutlay; Nelson, Carl; Gagne, Havaleh; Rubin, Deborah; Heimann, Ruth [Dept. of Radiation Oncology, University of Vermont Medical Center, Burlington (United States); Wilson, Karen [University of Vermont Cancer Center, Burlington (United States)

    2017-03-15

    Several accelerated partial breast radiation (APBR) techniques have been investigated in patients with early-stage breast cancer (BC); however, the optimal treatment delivery techniques remain unclear. We evaluated the feasibility and toxicity of APBR delivered using intensity-modulated radiation therapy (IMRT) in elderly patients with stage I BC, using a novel fractionation schedule. Forty-two patients aged ≥65 years, with stage I BC who underwent breast conserving surgery were enrolled in a phase I/II study evaluating APBR using IMRT. Forty eligible patients received 40 Gy in 4 Gy daily fractions. Patients were assessed for treatment related toxicities, and cosmesis, before APBR, during, and after completion of the treatment. The median age was 73 years, median tumor size 0.8 cm and the median follow-up was 54 months. The 5-year locoregional control was 97.5% and overall survival 90%. Erythema and skin pigmentation was the most common acute adverse event, reported by 27 patients (69%). Twenty-six patients (65%) reported mild pain, rated 1-4/10. This improved at last follow-up to only 2 (15%). Overall the patient and physician reported worst late toxicities were lower than the baseline and at last follow-up, patients and physicians rated cosmesis as excellent/good in 93% and 86 %, respectively. In this prospective trial, we observed an excellent rate of tumor control with daily APBR. The acceptable toxicity profile and cosmetic results of this study support the use of IMRT planned APBR with daily schedule in elderly patients with early stage BC.

  20. Schedulability-Driven Communication Synthesis for Time Triggered Embedded Systems

    DEFF Research Database (Denmark)

    Pop, Paul; Eles, Petru; Peng, Zebo

    2006-01-01

    We present an approach to static priority preemptive process scheduling for the synthesis of hard real-time distributed embedded systems where communication plays an important role. The communication model is based on a time-triggered protocol. We have developed an analysis for the communication...... delays proposing four different message scheduling policies over a time-triggered communication channel. Optimization strategies for the synthesis of communication are developed, and the four approaches to message scheduling are compared using extensive experiments...

  1. Schedulability-Driven Communication Synthesis for Time Triggered Embedded Systems

    DEFF Research Database (Denmark)

    Pop, Paul; Eles, Petru; Peng, Zebo

    1999-01-01

    We present an approach to static priority preemptive process scheduling for the synthesis of hard real-time distributed embedded systems where communication plays an important role. The communication model is based on a time-triggered protocol. We have developed an analysis for the communication...... delays proposing four different message scheduling policies over a time-triggered communication channel. Optimization strategies for the synthesis of communication are developed, and the four approaches to message scheduling are compared using extensive experiments....

  2. Schedulability-Driven Communication Synthesis for Time Triggered Embedded Systems

    DEFF Research Database (Denmark)

    Pop, Paul; Eles, Petru; Peng, Zebo

    2004-01-01

    We present an approach to static priority preemptive process scheduling for the synthesis of hard real-time distributed embedded systems where communication plays an important role. The communication model is based on a time-triggered protocol. We have developed an analysis for the communication...... delays with four different message scheduling policies over a time-triggered communication channel. Optimization strategies for the synthesis of communication are developed, and the four approaches to message scheduling are compared using extensive experiments....

  3. Accelerator microanalysis

    International Nuclear Information System (INIS)

    Tuniz, C.

    1997-01-01

    Particle accelerators have been developed more than sixty years ago to investigate nuclear and atomic phenomena. A major shift toward applications of accelerators in the study of materials structure and composition in inter-disciplinary projects has been witnessed in the last two decades. The Australian Nuclear Science and Technology Organisation (ANSTO) has developed advanced research programs based on the use of particle and photon beams. Atmospheric pollution problems are investigated at the 3 MV Van de Graff accelerator using ion beam analysis techniques to detect toxic elements in aerosol particles. High temperature superconductor and semiconductor materials are characterised using the recoil of iodine and other heavy ions produced at ANTARES, the 10-MV Tandem accelerator. A heavy-ion microprobe is presently being developed at ANTARES to map elemental concentrations of specific elements with micro-size resolution. An Accelerator mass Spectrometry (AMS) system has been developed at ANSTO for the ultra-sensitive detection of Carbon-14, Iodine-129 and other long-lived radioisotopes. This AMS spectrometer is a key instrument for climate change studies and international safeguards. ANSTO is also managing the Australian Synchrotron Research program based on facilities developed at the Photon Factory (Japan) and at the Advanced Photon Source (USA). Advanced projects in biology, materials chemistry, structural condensed matter and other disciplines are being promoted by a consortium involving Australian universities and research institutions. This paper will review recent advances in the use of particle accelerators, with a particular emphasis on applications developed at ANSTO and related to problems of international concern, such as global environmental change, public health and nuclear proliferation

  4. 75 FR 42831 - Proposed Collection; Comment Request for Form 1065, Schedule C, Schedule D, Schedule K-1...

    Science.gov (United States)

    2010-07-22

    .../or continuing information collections, as required by the Paperwork Reduction Act of 1995, Public Law... Income, Credits, Deductions and Other Items), Schedule L (Balance Sheets per Books), Schedule M-1 (Reconciliation of Income (Loss) per Books With Income (Loss) per Return)), Schedule M-2 (Analysis of Partners...

  5. Accelerated Distributed Dual Averaging Over Evolving Networks of Growing Connectivity

    Science.gov (United States)

    Liu, Sijia; Chen, Pin-Yu; Hero, Alfred O.

    2018-04-01

    We consider the problem of accelerating distributed optimization in multi-agent networks by sequentially adding edges. Specifically, we extend the distributed dual averaging (DDA) subgradient algorithm to evolving networks of growing connectivity and analyze the corresponding improvement in convergence rate. It is known that the convergence rate of DDA is influenced by the algebraic connectivity of the underlying network, where better connectivity leads to faster convergence. However, the impact of network topology design on the convergence rate of DDA has not been fully understood. In this paper, we begin by designing network topologies via edge selection and scheduling. For edge selection, we determine the best set of candidate edges that achieves the optimal tradeoff between the growth of network connectivity and the usage of network resources. The dynamics of network evolution is then incurred by edge scheduling. Further, we provide a tractable approach to analyze the improvement in the convergence rate of DDA induced by the growth of network connectivity. Our analysis reveals the connection between network topology design and the convergence rate of DDA, and provides quantitative evaluation of DDA acceleration for distributed optimization that is absent in the existing analysis. Lastly, numerical experiments show that DDA can be significantly accelerated using a sequence of well-designed networks, and our theoretical predictions are well matched to its empirical convergence behavior.

  6. New Developments in the Simulation of Advanced Accelerator Concepts

    International Nuclear Information System (INIS)

    Paul, K.; Cary, J.R.; Cowan, B.; Bruhwiler, D.L.; Geddes, C.G.R.; Mullowney, P.J.; Messmer, P.; Esarey, E.; Cormier-Michel, E.; Leemans, W.P.; Vay, J.-L.

    2008-01-01

    Improved computational methods are essential to the diverse and rapidly developing field of advanced accelerator concepts. We present an overview of some computational algorithms for laser-plasma concepts and high-brightness photocathode electron sources. In particular, we discuss algorithms for reduced laser-plasma models that can be orders of magnitude faster than their higher-fidelity counterparts, as well as important on-going efforts to include relevant additional physics that has been previously neglected. As an example of the former, we present 2D laser wakefield accelerator simulations in an optimal Lorentz frame, demonstrating and gt;10 GeV energy gain of externally injected electrons over a 2 m interaction length, showing good agreement with predictions from scaled simulations and theory, with a speedup factor of ∼2,000 as compared to standard particle-in-cell.

  7. PROTO-II: a short pulse water insulated accelerator

    International Nuclear Information System (INIS)

    Martin, T.H.; VanDevender, J.P.; Johnson, D.L.; McDaniel, D.H.; Aker, M.

    1975-01-01

    A new accelerator, designated Proto-II, is presently under construction at Sandia Laboratories. Proto-II will have a nominal output of 100 kJ into a two-sided diode at a voltage of 1.5 MV and a total current of over 6 MA for 24 ns. This accelerator will be utilized for electron beam fusion experiments and for pulsed power and developmental studies leading to a proposed further factor of five scale-up in power. The design of Proto-II is based upon recent water switching developments and represents a 10-fold extrapolation of those results. Initial testing of Proto-II is scheduled to begin in 1976. Proto-II power flow starts with eight Marx generators which charge 16 water-insulated storage capacitors. Eight triggered, 3 MV, SF 6 gas-insulated switches next transfer the energy through oil-water interfaces into the first stage of 16 parallel lines. Next, the 16 first stages transfer their energy into the pulse forming lines and fast switching sections.The energy is then delivered to two converging, back-to-back, disk-shaped transmission line. Two back-to-back diodes then form the electron beams which are focused onto a common anode

  8. Experience and development program for the I.V. Kurchatov Atomic Energy Institute electron linear accelerator

    International Nuclear Information System (INIS)

    Aref'ev, A.V.; Blokhov, M.V.; Gerasimov, V.F.

    1981-01-01

    A program of physical investigations and the corresponding requirements to accelerated beam parameters are discussed in brief. The state and working capacity of separate units and the accelerator as a whole for the 8-year operating period are analyzed. The aim and principal program points of linear electron accelerator modernization are defined. The program of accelerator modernization assumes: electron beam energy increase up to 100-120 MeV; mounting of three additional accelerating sections; clystron efficiency increase; development of a highly reliable modulator; stabilized power supply sources; a system of synchronous start-up; a focusing system; a beam separation system and etc [ru

  9. Accounting for Inpatient Wards when developing Master Surgical Schedules

    NARCIS (Netherlands)

    Vanberkel, P.T.; Boucherie, Richardus J.; Hans, Elias W.; Hurink, Johann L.; van Lent, W.A.M.; van Harten, Willem H.; van Harten, Wim H.

    BACKGROUND: As the demand for health care services increases, the need to improve patient flow between departments has likewise increased. Understanding how the master surgical schedule (MSS) affects the inpatient wards and exploiting this relationship can lead to a decrease in surgery

  10. Technology Estimating 2: A Process to Determine the Cost and Schedule of Space Technology Research and Development

    Science.gov (United States)

    Cole, Stuart K.; Wallace, Jon; Schaffer, Mark; May, M. Scott; Greenberg, Marc W.

    2014-01-01

    As a leader in space technology research and development, NASA is continuing in the development of the Technology Estimating process, initiated in 2012, for estimating the cost and schedule of low maturity technology research and development, where the Technology Readiness Level is less than TRL 6. NASA' s Technology Roadmap areas consist of 14 technology areas. The focus of this continuing Technology Estimating effort included four Technology Areas (TA): TA3 Space Power and Energy Storage, TA4 Robotics, TA8 Instruments, and TA12 Materials, to confine the research to the most abundant data pool. This research report continues the development of technology estimating efforts completed during 2013-2014, and addresses the refinement of parameters selected and recommended for use in the estimating process, where the parameters developed are applicable to Cost Estimating Relationships (CERs) used in the parametric cost estimating analysis. This research addresses the architecture for administration of the Technology Cost and Scheduling Estimating tool, the parameters suggested for computer software adjunct to any technology area, and the identification of gaps in the Technology Estimating process.

  11. Brief review of the development of electrostatic accelerators and continuing work at Strasbourg

    International Nuclear Information System (INIS)

    Letournel, M.

    1988-01-01

    The development of electrostatic accelerators follows the need of high energy charged particles. It has been a continuous increase in voltage from some MV in the 1930's, up to some 20 MV nowadays, and around 35 MV in a near future. That allows to accelerate and to make nuclear reactions for almost all stable nuclei existing in nature

  12. An adaptive cryptographic accelerator for network storage security on dynamically reconfigurable platform

    Science.gov (United States)

    Tang, Li; Liu, Jing-Ning; Feng, Dan; Tong, Wei

    2008-12-01

    Existing security solutions in network storage environment perform poorly because cryptographic operations (encryption and decryption) implemented in software can dramatically reduce system performance. In this paper we propose a cryptographic hardware accelerator on dynamically reconfigurable platform for the security of high performance network storage system. We employ a dynamic reconfigurable platform based on a FPGA to implement a PowerPCbased embedded system, which executes cryptographic algorithms. To reduce the reconfiguration latency, we apply prefetch scheduling. Moreover, the processing elements could be dynamically configured to support different cryptographic algorithms according to the request received by the accelerator. In the experiment, we have implemented AES (Rijndael) and 3DES cryptographic algorithms in the reconfigurable accelerator. Our proposed reconfigurable cryptographic accelerator could dramatically increase the performance comparing with the traditional software-based network storage systems.

  13. Progress In Plasma Accelerator Development for Dynamic Formation of Plasma Liners

    Science.gov (United States)

    Thio, Y. C. Francis; Eskridge, Richard; Martin, Adam; Smith, James; Lee, Michael; Cassibry, Jason T.; Griffin, Steven; Rodgers, Stephen L. (Technical Monitor)

    2002-01-01

    An experimental plasma accelerator for magnetic target fusion (MTF) applications under development at the NASA Marshall Space Flight Center is described. The accelerator is a coaxial pulsed plasma thruster (Figure 1). It has been tested experimentally and plasma jet velocities of approx.50 km/sec have been obtained. The plasma jet has been photographed with 10-ns exposure times to reveal a stable and repeatable plasma structure (Figure 2). Data for velocity profile information has been obtained using light pipes and magnetic probes embedded in the gun walls to record the plasma and current transit respectively at various barrel locations. Preliminary spatially resolved spectral data and magnetic field probe data are also presented. A high speed triggering system has been developed and tested as a means of reducing the gun "jitter". This jitter is being characterized and future work for second generation "ultra-low jitter" gun development is being identified.

  14. Sport Tournament Automated Scheduling System

    Directory of Open Access Journals (Sweden)

    Raof R. A. A

    2018-01-01

    Full Text Available The organizer of sport events often facing problems such as wrong calculations of marks and scores, as well as difficult to create a good and reliable schedule. Most of the time, the issues about the level of integrity of committee members and also issues about errors made by human came into the picture. Therefore, the development of sport tournament automated scheduling system is proposed. The system will be able to automatically generate the tournament schedule as well as automatically calculating the scores of each tournament. The problem of scheduling the matches of a round robin and knock-out phase in a sport league are given focus. The problem is defined formally and the computational complexity is being noted. A solution algorithm is presented using a two-step approach. The first step is the creation of a tournament pattern and is based on known graph-theoretic method. The second one is an assignment problem and it is solved using a constraint based depth-first branch and bound procedure that assigns actual teams to numbers in the pattern. As a result, the scheduling process and knock down phase become easy for the tournament organizer and at the same time increasing the level of reliability.

  15. Further development of the V-code for recirculating linear accelerator simulations

    Energy Technology Data Exchange (ETDEWEB)

    Franke, Sylvain; Ackermann, Wolfgang; Weiland, Thomas [Institut fuer Theorie Elektromagnetischer Felder, Technische Universitaet Darmstadt (Germany); Eichhorn, Ralf; Hug, Florian; Kleinmann, Michaela; Platz, Markus [Institut fuer Kernphysik, Technische Universitaet Darmstadt (Germany)

    2011-07-01

    The Superconducting Darmstaedter LINear Accelerator (S-DALINAC) installed at the institute of nuclear physics (IKP) at TU Darmstadt is designed as a recirculating linear accelerator. The beam is first accelerated up to 10 MeV in the injector beam line. Then it is deflected by 180 degrees into the main linac. The linac section with eight superconducting cavities is passed up to three times, providing a maximal energy gain of 40 MeV on each passage. Due to this recirculating layout it is complicated to find an accurate setup for the various beam line elements. Fast online beam dynamics simulations can advantageously assist the operators because they provide a more detailed insight into the actual machine status. In this contribution further developments of the moment based simulation tool V-code which enables to simulate recirculating machines are presented together with simulation results.

  16. The development of stochastic process modeling through risk analysis derived from scheduling of NPP project

    International Nuclear Information System (INIS)

    Lee, Kwang Ho; Roh, Myung Sub

    2013-01-01

    There are so many different factors to consider when constructing a nuclear power plant successfully from planning to decommissioning. According to PMBOK, all projects have nine domains from a holistic project management perspective. They are equally important to all projects, however, this study focuses mostly on the processes required to manage timely completion of the project and conduct risk management. The overall objective of this study is to let you know what the risk analysis derived from scheduling of NPP project is, and understand how to implement the stochastic process modeling through risk management. Building the Nuclear Power Plant is required a great deal of time and fundamental knowledge related to all engineering. That means that integrated project scheduling management with so many activities is necessary and very important. Simulation techniques for scheduling of NPP project using Open Plan program, Crystal Ball program, and Minitab program can be useful tools for designing optimal schedule planning. Thus far, Open Plan and Monte Carlo programs have been used to calculate the critical path for scheduling network analysis. And also, Minitab program has been applied to monitor the scheduling risk. This approach to stochastic modeling through risk analysis of project activities is very useful for optimizing the schedules of activities using Critical Path Method and managing the scheduling control of NPP project. This study has shown new approach to optimal scheduling of NPP project, however, this does not consider the characteristic of activities according to the NPP site conditions. Hence, this study needs more research considering those factors

  17. The development of stochastic process modeling through risk analysis derived from scheduling of NPP project

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Kwang Ho; Roh, Myung Sub [KEPCO International Nuclear Graduate School, Ulsan (Korea, Republic of)

    2013-10-15

    There are so many different factors to consider when constructing a nuclear power plant successfully from planning to decommissioning. According to PMBOK, all projects have nine domains from a holistic project management perspective. They are equally important to all projects, however, this study focuses mostly on the processes required to manage timely completion of the project and conduct risk management. The overall objective of this study is to let you know what the risk analysis derived from scheduling of NPP project is, and understand how to implement the stochastic process modeling through risk management. Building the Nuclear Power Plant is required a great deal of time and fundamental knowledge related to all engineering. That means that integrated project scheduling management with so many activities is necessary and very important. Simulation techniques for scheduling of NPP project using Open Plan program, Crystal Ball program, and Minitab program can be useful tools for designing optimal schedule planning. Thus far, Open Plan and Monte Carlo programs have been used to calculate the critical path for scheduling network analysis. And also, Minitab program has been applied to monitor the scheduling risk. This approach to stochastic modeling through risk analysis of project activities is very useful for optimizing the schedules of activities using Critical Path Method and managing the scheduling control of NPP project. This study has shown new approach to optimal scheduling of NPP project, however, this does not consider the characteristic of activities according to the NPP site conditions. Hence, this study needs more research considering those factors.

  18. Job schedul in Grid batch farms

    International Nuclear Information System (INIS)

    Gellrich, Andreas

    2014-01-01

    We present here a study for a scheduler which cooperates with the queueing system TORQUE and is tailored to the needs of a HEP-dominated large Grid site with around 10000 jobs slots. Triggered by severe scaling problems of MAUI, a scheduler, referred to as MYSCHED, was developed and put into operation. We discuss conceptional aspects as well as experiences after almost two years of running.

  19. Task-specific shell for scheduling problems, ARES[sub TM]/SCH. Scheduling mondai muke task tokka shell ARES[sub TM]/SCH

    Energy Technology Data Exchange (ETDEWEB)

    Kojima, S; Narimatsu, K [Toshiba Corp., Tokyo (Japan)

    1994-08-01

    An Expert System (ES) Shell (developed by Toshiba Corp.) which applies to the scheduling of production plan and operation plan is introduced. It describes that this tool is equipped with flowchart editor and constraint condition editor which mention the knowledge related to scheduling method, and that the former expresses scheduling procedure knowledge in the form of flowchart by combining basic tasks prepared beforehand, and the latter expresses constraint conditions which should be satisfied by the schedule, and knowledge related to the priority order which should be considered in-between in the form of IF-THEN Rule which is very close to Japanese. In addition, the knowledge is equipped with knowledge debugging system which conducts debugging while executing the knowledge. It adds that by using this tool, the manhour required for the development and maintenance of ES can be reduced considerably. 2 refs., 3 figs.

  20. Accelerator update

    International Nuclear Information System (INIS)

    Anon.

    1995-01-01

    When the Accelerator Conference, combined International High Energy and US Particle versions, held in Dallas in May, was initially scheduled, progress nearby for the US Superconducting Supercollider was high on the preliminary agenda. With the SSC voted down by Congress in October 1993, this was no longer the case. However the content of the meeting, in terms of both its deep implications for ambitious new projects and the breadth of its scope, showed that the worldwide particle accelerator field is far from being moribund. A traditional feature of such accelerator conferences is the multiplicity of parallel sessions. No one person can attend all sessions, so that delegates can follow completely different paths and emerge with totally different impressions. Despite this overload, and despite the SSC cancellation, the general picture is one of encouraging progress over a wide range of major new projects throughout the world. At the same time, spinoff from, and applications of, accelerators and accelerator technology are becoming increasingly important. Centrestage is now CERN's LHC proton-proton collider, where a test string of superconducting magnets is operating over long periods at the nominal LHC field of 8.36 tesla or more. The assignment of the underground areas in the existing 27- kilometre LEP tunnel is now quasidefinitive (see page 3). For CERN's existing big machine, the LEP electron-positron collider, ongoing work concentrates on boosting performance using improved optics and bunch trains. But the main objective is the LEP2 scheme using superconducting accelerating cavities to boost the beam energy (see page 6). After some initial teething problems, production and operation of these cavities appears to have been mastered, at least under test conditions. A highlight at CERN last year was the first run with lead ions (December 1994, page 15). Handling these heavy particles with systems originally designed for protons calls for ingenuity. The SPS

  1. Accelerator update

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    1995-09-15

    When the Accelerator Conference, combined International High Energy and US Particle versions, held in Dallas in May, was initially scheduled, progress nearby for the US Superconducting Supercollider was high on the preliminary agenda. With the SSC voted down by Congress in October 1993, this was no longer the case. However the content of the meeting, in terms of both its deep implications for ambitious new projects and the breadth of its scope, showed that the worldwide particle accelerator field is far from being moribund. A traditional feature of such accelerator conferences is the multiplicity of parallel sessions. No one person can attend all sessions, so that delegates can follow completely different paths and emerge with totally different impressions. Despite this overload, and despite the SSC cancellation, the general picture is one of encouraging progress over a wide range of major new projects throughout the world. At the same time, spinoff from, and applications of, accelerators and accelerator technology are becoming increasingly important. Centrestage is now CERN's LHC proton-proton collider, where a test string of superconducting magnets is operating over long periods at the nominal LHC field of 8.36 tesla or more. The assignment of the underground areas in the existing 27- kilometre LEP tunnel is now quasidefinitive (see page 3). For CERN's existing big machine, the LEP electron-positron collider, ongoing work concentrates on boosting performance using improved optics and bunch trains. But the main objective is the LEP2 scheme using superconducting accelerating cavities to boost the beam energy (see page 6). After some initial teething problems, production and operation of these cavities appears to have been mastered, at least under test conditions. A highlight at CERN last year was the first run with lead ions (December 1994, page 15). Handling these heavy particles with systems originally designed for protons calls for ingenuity. The SPS has managed

  2. Research and Development Roadmap For Next-Generation Low-Global Warming Potential Refrigerants

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2011-07-01

    The Department of Energy commissioned this roadmap to establish a set of high-priority research and development (R&D) activities that will accelerate the transition to low-GWP refrigerants across the entire heating, ventilation, air-conditioning and refrigeration (HVAC&R) industry. The schedule of R&D activities occurs within an accelerated five-year timeframe, and covers several prominent equipment types. The roadmap is organized around four primary objectives to: assess and mitigate safety risks, characterize refrigerant properties, understand efficiency and environmental tradeoffs, and support new refrigerant and equipment development.

  3. Influence of Intuition and Capability on Accelerated Product Development in Big-Medium Scaled Food Companies in Indonesia

    Directory of Open Access Journals (Sweden)

    Pepey Riawati Kurnia

    2013-06-01

    Full Text Available To face the pressure of competition, more and more companies perform accelerated product development by shortening the product development time so that the product will arrive at the market at the shortest time. Food industry has also performed accelerated product development. Using evolution theory, contingency theory, market-based view, and resource-based view a research model has been built. Results of the research’s initial identification show that food industry in Indonesia is in growth level towards maturity level. Meanwhile, competition in the food industry is in moderate level towards hypercompetition level. Tactics of accelerated product development often carried out is by simplifying the product development steps to eliminating the product development steps. The innovation type used is incremental innovation since it is fast and easy. Results of the research give information that intuition and capabilities are the main motivating factors for big-medium scaled food companies in Indonesia to accelerate product development.

  4. Experience in using workstations as hosts in an accelerator control environment

    International Nuclear Information System (INIS)

    Abola, A.; Casella, R.; Clifford, T.; Hoff, L.; Katz, R.; Kennell, S.; Mandell, S.; McBreen, E.; Weygand, D.P.

    1987-03-01

    A new control system has been used for light ion acceleration at the Alternating Gradient Synchrotron (AGS). The control system uses Apollo workstations in the dual role of console hardware computer and controls system host. It has been found that having a powerful dedicated CPU with a demand paging virtual memory OS featuring strong interprocess communication, mapped memory shared files, shared code, and multi-window capabilities, allows us to provide an efficient operation environment in which users may view and manage several control processes simultaneously. The same features which make workstations good console computers also provide an outstanding platform for code development. The software for the system, consisting of about 30K lines of ''C'' code, was developed on schedule, ready for light ion commissioning. System development is continuing with work being done on applications programs

  5. Experience in using workstations as hosts in an accelerator control environment

    International Nuclear Information System (INIS)

    Abola, A.; Casella, R.; Clifford, T.; Hoff, L.; Katz, R.; Kennell, S.; Mandell, S.; McBreen, E.; Weygand, D.P.

    1987-01-01

    A new control system has been used for light ion acceleration at the Alternating Gradient Synchrotron (AGS). The control system uses Apollo workstations in the dual role of console hardware computer and controls system host. It has been found that having a powerful dedicated CPU with a demand paging virtual memory OS featuring strong interprocess communication, mapped memory shared files, shared code, and multi-window capabilities, allows us to provide an efficient operation environment in which users may view and manage several control processes simultaneously. The same features which make workstations good console computers also provide an outstanding platform for code development. The software for the system, consisting of about 30K lines of ''C'' code, was developed on schedule, ready for light ion commissioning. System development is continuing with work being done on applications programs

  6. Prescribed Travel Schedules for Fatigue Management

    Science.gov (United States)

    Whitmire, Alexandra; Johnston, Smith; Lockley, Steven

    2011-01-01

    The NASA Fatigue Management Team is developing recommendations for managing fatigue during travel and for shift work operations, as Clinical Practice Guidelines for the Management of Circadian Desynchrony in ISS Operations. The Guidelines provide the International Space Station (ISS ) flight surgeons and other operational clinicians with evidence-based recommendations for mitigating fatigue and other factors related to sleep loss and circadian desynchronization. As much international travel is involved both before and after flight, the guidelines provide recommendations for: pre-flight training, in-flight operations, and post-flight rehabilitation. The objective of is to standardize the process by which care is provided to crewmembers, ground controllers, and other support personnel such as trainers, when overseas travel or schedule shifting is required. Proper scheduling of countermeasures - light, darkness, melatonin, diet, exercise, and medications - is the cornerstone for facilitating circadian adaptation, improving sleep, enhancing alertness, and optimizing performance. The Guidelines provide, among other things, prescribed travel schedules that outline the specific implementation of these mitigation strategies. Each travel schedule offers evidence based protocols for properly using the NASA identified countermeasures for fatigue. This presentation will describe the travel implementation schedules and how these can be used to alleviate the effects of jet lag and/or schedule shifts.

  7. The state of development of an intense resonance electron-ion accelerator based on Doppler effect

    Energy Technology Data Exchange (ETDEWEB)

    Egorov, A M; Ivanov, B I; Butenko, V I; Ognivenko, V V; Onishchenko, I N; Prishchepov, V P [Kharkov Inst. of Physics and Technology (Ukraine)

    1997-12-31

    An intense ion accelerator has been proposed and now is being developed in which accelerating and focusing electric fields in a slow wave structure are excited by an intense electron beam using the anomalous and the normal Doppler effects. The results of theoretical studies and computer simulations show the advantage of this acceleration method that will make it possible to obtain acceleration rates of the order of 10 - 100 MeV/m, and ion beam energies and currents of the order of 10-100 MeV, 1-10 A. The project and technical documentation of an experimental accelerating installation were worked out. Currently, the 5 MeV accelerator-injector URAL-5 is in operation; preliminary experiments on a small installation have been carried out; experimental investigations of an accelerating RF resonator model (in 1/2 scaling) are being performed; the accelerating test installation is being manufactured. (author). 1 tab. 12 fig., 6 refs.

  8. The state of development of an intense resonance electron-ion accelerator based on Doppler effect

    International Nuclear Information System (INIS)

    Egorov, A.M.; Ivanov, B.I.; Butenko, V.I.; Ognivenko, V.V.; Onishchenko, I.N.; Prishchepov, V.P.

    1996-01-01

    An intense ion accelerator has been proposed and now is being developed in which accelerating and focusing electric fields in a slow wave structure are excited by an intense electron beam using the anomalous and the normal Doppler effects. The results of theoretical studies and computer simulations show the advantage of this acceleration method that will make it possible to obtain acceleration rates of the order of 10 - 100 MeV/m, and ion beam energies and currents of the order of 10-100 MeV, 1-10 A. The project and technical documentation of an experimental accelerating installation were worked out. Currently, the 5 MeV accelerator-injector URAL-5 is in operation; preliminary experiments on a small installation have been carried out; experimental investigations of an accelerating RF resonator model (in 1/2 scaling) are being performed; the accelerating test installation is being manufactured. (author). 1 tab. 12 fig., 6 refs

  9. Monitoring Traffic Information with a Developed Acceleration Sensing Node

    Directory of Open Access Journals (Sweden)

    Zhoujing Ye

    2017-12-01

    Full Text Available In this paper, an acceleration sensing node for pavement vibration was developed to monitor traffic information, including vehicle speed, vehicle types, and traffic flow, where a hardware design with low energy consumption and node encapsulation could be accomplished. The service performance of the sensing node was evaluated, by methods including waterproof test, compression test, sensing performance analysis, and comparison test. The results demonstrate that the sensing node is low in energy consumption, high in strength, IPX8 waterproof, and high in sensitivity and resolution. These characteristics can be applied to practical road environments. Two sensing nodes were spaced apart in the direction of travelling. In the experiment, three types of vehicles passed by the monitoring points at several different speeds and values of d (the distance between the sensor and the nearest tire center line. Based on cross-correlation with kernel pre-smoothing, a calculation method was applied to process the raw data. New algorithms for traffic flow, speed, and axle length were proposed. Finally, the effects of vehicle speed, vehicle weight, and d value on acceleration amplitude were statistically evaluated. It was found that the acceleration sensing node can be used for traffic flow, vehicle speed, and other types of monitoring.

  10. Monitoring Traffic Information with a Developed Acceleration Sensing Node.

    Science.gov (United States)

    Ye, Zhoujing; Wang, Linbing; Xu, Wen; Gao, Zhifei; Yan, Guannan

    2017-12-05

    In this paper, an acceleration sensing node for pavement vibration was developed to monitor traffic information, including vehicle speed, vehicle types, and traffic flow, where a hardware design with low energy consumption and node encapsulation could be accomplished. The service performance of the sensing node was evaluated, by methods including waterproof test, compression test, sensing performance analysis, and comparison test. The results demonstrate that the sensing node is low in energy consumption, high in strength, IPX8 waterproof, and high in sensitivity and resolution. These characteristics can be applied to practical road environments. Two sensing nodes were spaced apart in the direction of travelling. In the experiment, three types of vehicles passed by the monitoring points at several different speeds and values of d (the distance between the sensor and the nearest tire center line). Based on cross-correlation with kernel pre-smoothing, a calculation method was applied to process the raw data. New algorithms for traffic flow, speed, and axle length were proposed. Finally, the effects of vehicle speed, vehicle weight, and d value on acceleration amplitude were statistically evaluated. It was found that the acceleration sensing node can be used for traffic flow, vehicle speed, and other types of monitoring.

  11. Development of an irrigation scheduling software based on model predicted crop water stress

    Science.gov (United States)

    Modern irrigation scheduling methods are generally based on sensor-monitored soil moisture regimes rather than crop water stress which is difficult to measure in real-time, but can be computed using agricultural system models. In this study, an irrigation scheduling software based on RZWQM2 model pr...

  12. A Framework for Simplifying the Development of Kernel Schedulers: Design and Performance Evaluation

    DEFF Research Database (Denmark)

    Muller, Gilles; Lawall, Julia Laetitia; Duschene, Hervé

    2005-01-01

    Writing a new scheduler and integrating it into an existing OS is a daunting task, requiring the understanding of multiple low-level kernel mechanisms. Indeed, implementing a new scheduler is outside the expertise of application programmers, even though they are the ones who understand best the s...

  13. Modern trends in ion source development for low-energy accelerators. Final report of a consultants' meeting

    International Nuclear Information System (INIS)

    1998-01-01

    The IAEA consultative meeting was held to review the status of ion source development for accelerators having output energies less than 100 MeV (low-energy accelerators). Terms of reference for the meeting were to review the status of ion source development for several different types of low-energy accelerators (Van de Graaff, cyclotron, sealed-tube neutron generator, ion implanter, etc.) and to highlight any recent advances in this field. Individual abstracts were prepared for 5 papers presented at this meeting

  14. Design of an X-band accelerating structure using a newly developed structural optimization procedure

    Energy Technology Data Exchange (ETDEWEB)

    Huang, Xiaoxia [Shanghai Institute of Applied Physics, Chinese Academy of Sciences, Shanghai 201800 (China); University of Chinese Academy of Sciences, Beijing 100049 (China); Fang, Wencheng; Gu, Qiang [Shanghai Institute of Applied Physics, Chinese Academy of Sciences, Shanghai 201800 (China); Zhao, Zhentang, E-mail: zhaozhentang@sinap.ac.cn [Shanghai Institute of Applied Physics, Chinese Academy of Sciences, Shanghai 201800 (China); University of Chinese Academy of Sciences, Beijing 100049 (China)

    2017-05-11

    An X-band high gradient accelerating structure is a challenging technology for implementation in advanced electron linear accelerator facilities. The present work discusses the design of an X-band accelerating structure for dedicated application to a compact hard X-ray free electron laser facility at the Shanghai Institute of Applied Physics, and numerous design optimizations are conducted with consideration for radio frequency (RF) breakdown, RF efficiency, short-range wakefields, and dipole/quadrupole field modes, to ensure good beam quality and a high accelerating gradient. The designed X-band accelerating structure is a constant gradient structure with a 4π/5 operating mode and input and output dual-feed couplers in a racetrack shape. The design process employs a newly developed effective optimization procedure for optimization of the X-band accelerating structure. In addition, the specific design of couplers providing high beam quality by eliminating dipole field components and reducing quadrupole field components is discussed in detail.

  15. CEBAF [Continuous Electron Beam Accelerator Facility] design report

    International Nuclear Information System (INIS)

    1986-05-01

    This book describes the conceptual design of, and the planning for, the Continuous Electron Beam Accelerator Facility (CEBAF), which will be a high-intensity, continuous-wave electron linear accelerator (linac) for nuclear physics. Its principal scientific goal is to understand the quark structure, behavior, and clustering of individual nucleons in the nuclear medium, and simultaneously to understand the forces governing this behavior. The linac will consist of 1 GeV of accelerating structure, split into two antiparallel 0.5-GeV segments. The segments will be connected by a beam transport system to circulate the electron beams from one segment to the other for up to four complete passes of acceleration. The maximum beam energy will be 4 GeV at a design current of 200 microamperes. The accelerator complex will also include systems to extract three continuous beams from the linac and to deliver them to three experimental halls equipped with detectors and instrumentation for nuclear physics research. The accelerating structure will be kept superconducting within insulated cryostats filled with liquid helium produced at a central helium refrigerator and distributed to the cryostats via insulated transfer lines. An injector, instrumentation and controls for the accelerator, radio-frequency power systems, and several support facilities will also be provided. A cost estimate based on the Work Breakdown Structure has been completed. Assuming a five-year construction schedule starting early in FY 1987, the total estimated cost is $236 million (actual year dollars), including contingency

  16. Status of the ISAC-II Accelerator at TRIUMF

    CERN Document Server

    Laxdal, Robert E; Bricault, Pierre; Bylinskii, Iouri; Fong, Ken; Marchetto, Marco; Mitra, Amiya K; Poirier, Roger L; Rawnsley, William R; Schmor, Paul; Sekachev, Igor; Stanford, Guy; Stinson, Glen; Zviagintsev, Vladimir

    2005-01-01

    A heavy ion superconducting linac is being installed at TRIUMF to increase the final energy of radioactive beams at ISAC. A first stage of 20MV consisting of five medium beta cryomodules each with four quarter wave bulk niobium cavities and a superconducting solenoid is being installed with initial beam commissioning scheduled for Dec. 2005. The initial cryomodule has met cryogenic and rf performance specifications. In addition we have demonstrated acceleration of alpha particles in an off-line test. A 500W refrigerator system has been installed and commissioned in Jan. 2005 with cold distribution due for commissioning in Sept. 2005. A transfer beamline from the ISAC accelerator and beam transport to a first experimental station are being installed. The status of the project will be presented.

  17. Accelerating tube for the ''EG-1'' electrostatic accelerator

    International Nuclear Information System (INIS)

    Romanov, V.A.; Ivanov, V.V.; Krupnov, E.P.; Debin, V.K.; Dudkin, N.I.; Volodin, V.I.

    1980-01-01

    A design of an accelerating tube (AT) for an electrostatic accelerator of the EG-1 type is described. Primary consideration in the development of the AT has been given to increasing the electric strength of accelerating gaps, the vacuum conductivity and better insulator screening from charged particles. After AT vacuum and high-voltage ageing in the accelerator, a hydrogen ions beam of up to 80 μA has been produced. The beam was adequately shaped in the energy range from 1.8 to 5.0 MeV [ru

  18. Development of an Automatic Frequency Control (AFC) System for RF Electron Linear Accelerators

    International Nuclear Information System (INIS)

    Cha, Sungsu; Kim, Yujong; Lee, Byeong-No; Joo, Youngwoo; Lee, Soo Min; Lee, Byung Cheol; Cha, Hyungki; Park, Hyung Dal; Lee, Seung Hyun

    2015-01-01

    In this paper, the design, fabrication, and RF power test of the AFC system for the X-band linac are presented. The main function of the AFC system is automatically matching of the resonance frequency of the accelerating structure and the RF frequency of the magnetron. For the frequency tuning, a fine tuning of 10 kHz is possible by rotating the tuning shaft with a rotation of 0.72 degree per pulse. Therefore, the frequency deviation is about 0.01%, and almost full RF power (2.1 MW) transmission was obtained because the reflected power is minimized. The Radiation Equipment Research Division of the Korea Atomic Energy Research Institute has been developing and upgrading a medical/industrial X-band RF electron linear accelerators. The medical compact RF electron linear accelerator consists of an electron gun, an acceleration tube (accelerating structure), two solenoid magnets, two steering magnets, a magnetron, modulator, an automatic frequency control (AFC) system, and an X-ray generating target. The accelerating structure of the component is composed of oxygen-free high-conductivity copper (OFHC). Therefore, the volume of the structure, hence, its resonance frequency can easily be changeable if the ambient temperature and pressure are changed. If the RF frequency of the 9300 MHz magnetron and the resonance frequency of accelerating structure are not matched, performance of the structure can be degraded. An AFC system is automatically matched with the RF frequency of the magnetron and resonance frequency of the accelerating structure, which obtained a high output power and reliable accelerator operation

  19. Development of an Automatic Frequency Control (AFC) System for RF Electron Linear Accelerators

    Energy Technology Data Exchange (ETDEWEB)

    Cha, Sungsu; Kim, Yujong; Lee, Byeong-No; Joo, Youngwoo; Lee, Soo Min; Lee, Byung Cheol; Cha, Hyungki [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of); Park, Hyung Dal [Radiation Technology eXcellence, Daejeon (Korea, Republic of); Lee, Seung Hyun [Sungkyunkwan University, Suwon (Korea, Republic of)

    2015-10-15

    In this paper, the design, fabrication, and RF power test of the AFC system for the X-band linac are presented. The main function of the AFC system is automatically matching of the resonance frequency of the accelerating structure and the RF frequency of the magnetron. For the frequency tuning, a fine tuning of 10 kHz is possible by rotating the tuning shaft with a rotation of 0.72 degree per pulse. Therefore, the frequency deviation is about 0.01%, and almost full RF power (2.1 MW) transmission was obtained because the reflected power is minimized. The Radiation Equipment Research Division of the Korea Atomic Energy Research Institute has been developing and upgrading a medical/industrial X-band RF electron linear accelerators. The medical compact RF electron linear accelerator consists of an electron gun, an acceleration tube (accelerating structure), two solenoid magnets, two steering magnets, a magnetron, modulator, an automatic frequency control (AFC) system, and an X-ray generating target. The accelerating structure of the component is composed of oxygen-free high-conductivity copper (OFHC). Therefore, the volume of the structure, hence, its resonance frequency can easily be changeable if the ambient temperature and pressure are changed. If the RF frequency of the 9300 MHz magnetron and the resonance frequency of accelerating structure are not matched, performance of the structure can be degraded. An AFC system is automatically matched with the RF frequency of the magnetron and resonance frequency of the accelerating structure, which obtained a high output power and reliable accelerator operation.

  20. RAPIDE 0.0 RHIC Accelerator Physics Intrepid Development Environment

    Energy Technology Data Exchange (ETDEWEB)

    Satogata, T. [Brookhaven National Lab. (BNL), Upton, NY (United States); Saltmarsh, C. [Brookhaven National Lab. (BNL), Upton, NY (United States); Peggs, S. [Brookhaven National Lab. (BNL), Upton, NY (United States)

    1993-08-01

    This document is a guide to the common environmental features of computing in (and around) the RHIC Accelerator Physics.sectio on the 'zoo' cluster of UNJX workstations, in RAPIDE, the RHIC Accelerator Physics Intrepid Development Environment It is hoped tliat later revisions of this document will approach a more professional 'style guide', beyond the convenient collection of pointers and hints presented here. RAP does two kinds of computing, "controls" and "general", addressed in sections 2 and 3 of this document For general computing, efficient system administration requires cooperation in using a common environment There is a much stronger need to define - and adhere to - a commonly agreed set of styles (or rules) in developing controls software. Right now, these rules have been set "de facto". Future improvements to the controls environment, particularly in response to the opinions of users, depends on broad knowledge of what the rules are. There are environmental issues that are basic to both controls and general computing, and that are so fundamental that they are (almost) unarguable. They are described immediately below, in the next section.

  1. Preliminary Conceptual Design Report for the FACET-II Project at SLAC National Accelerator Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Hogan, Mark [SLAC National Accelerator Lab., Menlo Park, CA (United States)

    2016-04-22

    Plasma wakefield acceleration has the potential to dramatically shrink the size and cost of particle accelerators. Research at the SLAC National Accelerator Laboratory has demonstrated that plasmas can provide 1,000 times the acceleration in a given distance compared with current technologies. Developing revolutionary and more efficient acceleration techniques that allow for an affordable high-energy collider is the focus of FACET, a National User Facility at SLAC. The existing FACET National User Facility uses part of SLAC’s two-mile-long linear accelerator to generate high-density beams of electrons and positrons. FACET-II is a new test facility to develop advanced acceleration and coherent radiation techniques with high-energy electron and positron beams. It is the only facility in the world with high energy positron beams. FACET-II provides a major upgrade over current FACET capabilities and the breadth of the potential research program makes it truly unique. It will synergistically pursue accelerator science that is vital to the future of both advanced acceleration techniques for High Energy Physics, ultra-high brightness beams for Basic Energy Science, and novel radiation sources for a wide variety of applications. The design parameters for FACET-II are set by the requirements of the plasma wakefield experimental program. To drive the plasma wakefield requires a high peak current, in excess of 10kA. To reach this peak current, the electron and positron design bunch size is 10μ by 10μ transversely with a bunch length of 10μ. This is more than 200 times better than what has been achieved at the existing FACET. The beam energy is 10 GeV, set by the Linac length available and the repetition rate is up to 30 Hz. The FACET-II project is scheduled to be constructed in three major stages. Components of the project discussed in detail include the following: electron injector, bunch compressors and linac, the positron system, the Sector 20 sailboat and W chicanes

  2. Developmental energetics, sibling death, and parental instability as predictors of maturational tempo and life history scheduling in males from Cebu, Philippines.

    Science.gov (United States)

    Gettler, Lee T; McDade, Thomas W; Bragg, Jared M; Feranil, Alan B; Kuzawa, Christopher W

    2015-08-04

    Cross-species comparisons show that high extrinsic mortality favors the evolution of "faster" life histories. There is interest in applying this principle to human life history plasticity, based on the idea that psychosocial stressors that correlate with extrinsic mortality accelerate reproductive pace. Most prior studies have been conducted in settings in which psychosocial stressors co-occur with the maturation-accelerating influence of nutritional abundance. We evaluate cues of local mortality (sibling death) or low parental investment (paternal instability; maternal absence) and energetic measures during development as predictors of life history scheduling among males (n = 754) in a Philippine population with marginal developmental nutritional. Males who had more favorable nutritional status during childhood, as reflected in linear growth, skinfold thickness, and caloric intake, were more maturationally advanced in adolescence (all P maturation. While psychosocial stressors did not predict accelerated maturation, males who as children grew up with an unstable paternal presence had sex earlier (P maturity, while psychosocial stressors accelerate entry to parenthood, which may be comparatively more socially, rather than biologically, constrained. Am J Phys Anthropol, 2015. © 2015 Wiley Periodicals, Inc. © 2015 Wiley Periodicals, Inc.

  3. Accelerator developments since the ZGS by ZGS people

    International Nuclear Information System (INIS)

    Cho, Y.

    1994-01-01

    The ZGS was a facility, as well as an organization, where people got together to pursue a common goal of doing exciting science of the day. In this note, the authors describe notable events related to accelerators and accelerator people since the closing of the ZGS program some 15 years ago. Many of the same ZGS people have been carrying out the state-of-the art accelerator work around the Laboratory with the same dedication that characterized their work in the earlier days. First the authors describe how the activities were re-organized after the closing of the ZGS, the migration of people, and the organizational evolution since that time. Doing this shows the similarity between the birth of the ZGS and the birth of the Advanced Photon Source (APS). Then, some of the accelerator work by the former ZGS people are described. These include: (1) Intense Pulsed Neutron Source (IPNS), (2) GeV Electron Microtron (GEM), (3) Wake Field Accelerator Test Facility, (4) Advanced Photon Source, and (5) IPNS Upgrade

  4. Electrostatic accelerators

    CERN Document Server

    Hinterberger, F

    2006-01-01

    The principle of electrostatic accelerators is presented. We consider Cockcroft– Walton, Van de Graaff and Tandem Van de Graaff accelerators. We resume high voltage generators such as cascade generators, Van de Graaff band generators, Pelletron generators, Laddertron generators and Dynamitron generators. The speci c features of accelerating tubes, ion optics and methods of voltage stabilization are described. We discuss the characteristic beam properties and the variety of possible beams. We sketch possible applications and the progress in the development of electrostatic accelerators.

  5. Schedule control in Ling Ao nuclear power project

    International Nuclear Information System (INIS)

    Xie Ahai

    2007-01-01

    Ling Ao Nuclear Power Station (LANP) is first one built up by self-reliance in China with power capacity 990x2 MWe. The results of quality control, schedule control and cost control are satisfactory. The commercial operation days of Unit 1 and Unit 2 were 28th May 2002 and 8th Jan. 2003 respectively, which were 48 days and 66 days in advance of the project schedule. This paper presents the practices of self-reliance schedule control system in LANP. The paper includes 10 sections: schedule control system; targets of schedule control; schedule control at early stage of project; construction schedule; scheduling practice; Point curves; schedule control of design and procurement; a good practice of construction schedule control on site; commissioning and startup schedule; schedule control culture. Three figures are attached. The main contents of the self-reliance schedule control system are as follows: to draw up reasonable schedules and targets; to setup management mechanism and procedures; to organize powerful project management team; to establish close monitoring system; to provide timely progress reports and statistics information. Five kinds of schedule control targets are introduced, i.e. bar-chart schedule; milesones; Point curves; interface management; hydraulic test schedule of auxiliary piping loops; EMR/EMC/EESR issuance schedules. Six levels of bar-chart schedules were adopted in LANP, but the bar-chart schedules were not satisfactory for complicated erection condition on site, even using six levels of schedules. So a kind of Point curves was developed and their advantages are explained. Scheduling method of three elements: activity, duration, logic, which was adopted in LANP, is introduced. The duration of each piping activities in LANP level 2 project schedule was calculated based on the relevant working Point quantities. The analysis and adjustment of Point curves are illustrated, i.e. balance of monthly quantities; possible production in the peakload

  6. Off-Line and Dynamic Production Scheduling – A Comparative Case Study

    OpenAIRE

    Bożek Andrzej; Wysocki Marian

    2016-01-01

    A comprehensive case study of manufacturing scheduling solutions development is given. It includes highly generalized scheduling problem as well as a few scheduling modes, methods and problem models. The considered problem combines flexible job shop structure, lot streaming with variable sublots, transport times, setup times, and machine calendars. Tabu search metaheuristic and constraint programming methods have been used for the off-line scheduling. Two dynamic scheduling methods have also ...

  7. JAERI 20 MV tandem accelerator

    International Nuclear Information System (INIS)

    Tsukada, Kineo; Harada, Kichinosuke

    1977-01-01

    Accelerators have been developed as the experimental apparatuses for the studies on nuclei and elementary particles. One direction of the development is the acceleration of protons and electrons to more and more high energy, and another direction is the acceleration of heavy ions up to uranium to several MeV up to several hundreds MeV. However recently, accelerators are used as the useful tools for the studies in wider fields. There are electrostatic acceleration and high frequency acceleration in ion acceleration, and at present, super-large accelerators are high frequency acceleration type. In Japan Atomic Energy Research Institute, it was decided in 1975 to construct an electrostatic accelerator of tandem type in order to accelerate heavy ions. In case of the electrostatic acceleration, the construction is relatively simple, the acceleration of heavy ions is easy, the property of the ion beam is very good, and the energy is stable. Especially, the tandem type is convenient for obtaining high energy. The tandem accelerator of 20 MV terminal voltage was ordered from the National Electrostatics Corp., USA, and is expected to be completed in 1978. The significance of heavy ion acceleration in the development and research of atomic energy, tandem van de Graaff accelerators, the JAERI 20MV tandem accelerator, and the research project with this accelerator are described. (Kako, I.)

  8. Shift scheduling model considering workload and worker’s preference for security department

    Science.gov (United States)

    Herawati, A.; Yuniartha, D. R.; Purnama, I. L. I.; Dewi, LT

    2018-04-01

    Security department operates for 24 hours and applies shift scheduling to organize its workers as well as in hotel industry. This research has been conducted to develop shift scheduling model considering the workers physical workload using rating of perceived exertion (RPE) Borg’s Scale and workers’ preference to accommodate schedule flexibility. The mathematic model is developed in integer linear programming and results optimal solution for simple problem. Resulting shift schedule of the developed model has equally distribution shift allocation among workers to balance the physical workload and give flexibility for workers in working hours arrangement.

  9. Schedule Matters: Understanding the Relationship between Schedule Delays and Costs on Overruns

    Science.gov (United States)

    Majerowicz, Walt; Shinn, Stephen A.

    2016-01-01

    This paper examines the relationship between schedule delays and cost overruns on complex projects. It is generally accepted by many project practitioners that cost overruns are directly related to schedule delays. But what does "directly related to" actually mean? Some reasons or root causes for schedule delays and associated cost overruns are obvious, if only in hindsight. For example, unrealistic estimates, supply chain difficulties, insufficient schedule margin, technical problems, scope changes, or the occurrence of risk events can negatively impact schedule performance. Other factors driving schedule delays and cost overruns may be less obvious and more difficult to quantify. Examples of these less obvious factors include project complexity, flawed estimating assumptions, over-optimism, political factors, "black swan" events, or even poor leadership and communication. Indeed, is it even possible the schedule itself could be a source of delay and subsequent cost overrun? Through literature review, surveys of project practitioners, and the authors' own experience on NASA programs and projects, the authors will categorize and examine the various factors affecting the relationship between project schedule delays and cost growth. The authors will also propose some ideas for organizations to consider to help create an awareness of the factors which could cause or influence schedule delays and associated cost growth on complex projects.

  10. Latest Diagnostic Electronics Development for the PROSCAN Proton Accelerator

    International Nuclear Information System (INIS)

    Duperrex, P.A.; Frei, U.; Gamma, G.; Mueller, U.; Rezzonico, L.

    2004-01-01

    New VME-based diagnostic electronics are being developed for PROSCAN, a proton accelerator for medical application presently under construction at PSI. One new development is a VME-based multi-channel logarithmic amplifier for converting current to voltage (LogIV). The LogIV boards are used for measuring current from the multiple wire (harp) profile monitors. The LogIV calibration method, current dependant bandwidth and temperature stability are presented. Another development is a BPM front end, based on the newest digital receiver techniques. Features of this new system are the remote control of the preamplifier stage and the continuous monitoring of each individual signal overall gain. Characteristics of the developed prototype are given

  11. Present status of radiation processing and its future development by using electron accelerator in Vietnam

    International Nuclear Information System (INIS)

    Tran Khac An; Tran Tich Canh; Doan Binh; Nguyen Quoc Hien

    2003-01-01

    In Vietnam, studies on Radiation Processing have been carried out since 1983. Some results are applicable in the field of agriculture, health and foodstuff, some researches were developed to commercial scale and others have high potential for development by using electron accelerator. The paper offers the present status of radiation processing and also give out the growing tendency of using electron accelerator in the future. (author)

  12. Present status of radiation processing and its future development by using electron accelerator in Vietnam

    Energy Technology Data Exchange (ETDEWEB)

    Tran Khac An; Tran Tich Canh; Doan Binh [Research and Development Center for Radiation Technology (VINAGAMMA), Ho Chi Minh (Viet Nam); Nguyen Quoc Hien [Nuclear Research Institute (NRI), Dalat (Viet Nam)

    2003-02-01

    In Vietnam, studies on Radiation Processing have been carried out since 1983. Some results are applicable in the field of agriculture, health and foodstuff, some researches were developed to commercial scale and others have high potential for development by using electron accelerator. The paper offers the present status of radiation processing and also give out the growing tendency of using electron accelerator in the future. (author)

  13. Guidelines for successful self-scheduling on nursing units.

    Science.gov (United States)

    Russell, Elizabeth; Hawkins, Jenna; Arnold, Kara A

    2012-09-01

    Self-scheduling programs are an increasingly popular strategy utilized by employers to address the individual and organizational challenges resulting from employee work-life imbalance among the nursing workforce. Certain key components will ensure buy-in and support from staff when self-scheduling programs are developed.

  14. Development of an automated system for the operation of an electron beam accelerator

    International Nuclear Information System (INIS)

    Somessari, Samir L.; Moura, João A.; Calvo, Wilson Ap. Parejo

    2017-01-01

    Electron beam accelerators are used in many applications, such as basic physical research, chemistry, medicine, molecular biology, microelectronics, agriculture and industry, among others. The majority of the accelerators have electrons from a hot tungsten filament and their energy is increased as it passes through an electric field in the vacuum chamber. For industrial purposes, the most common model is Dynamitrons®. At IPEN-CNEN/SP, there is an electron beam accelerator Dynamitron® Type (Manufactured by RDI- Radiation Dynamics Inc., 1978) model DC1500/25/4. The technology applied was available in the 60's and 70's, but, nowadays is obsolete. Moreover, there are not original spare parts for this equipment any longer. The aim of this work is to develop a nationalized automated operation system for the accelerator, to replace the old equipment. (author)

  15. Development of an automated system for the operation of an electron beam accelerator

    Energy Technology Data Exchange (ETDEWEB)

    Somessari, Samir L.; Moura, João A.; Calvo, Wilson Ap. Parejo, E-mail: somessar@ipen.br [Instituto de Pesquisas Energeticas e Nucleares (IPEN/CNEN-SP), Sao Paulo, SP (Brazil)

    2017-11-01

    Electron beam accelerators are used in many applications, such as basic physical research, chemistry, medicine, molecular biology, microelectronics, agriculture and industry, among others. The majority of the accelerators have electrons from a hot tungsten filament and their energy is increased as it passes through an electric field in the vacuum chamber. For industrial purposes, the most common model is Dynamitrons®. At IPEN-CNEN/SP, there is an electron beam accelerator Dynamitron® Type (Manufactured by RDI- Radiation Dynamics Inc., 1978) model DC1500/25/4. The technology applied was available in the 60's and 70's, but, nowadays is obsolete. Moreover, there are not original spare parts for this equipment any longer. The aim of this work is to develop a nationalized automated operation system for the accelerator, to replace the old equipment. (author)

  16. Diagnostics for induction accelerators

    International Nuclear Information System (INIS)

    Fessenden, T.J.

    1996-04-01

    The induction accelerator was conceived by N. C. Christofilos and first realized as the Astron accelerator that operated at LLNL from the early 1960's to the end of 1975. This accelerator generated electron beams at energies near 6 MeV with typical currents of 600 Amperes in 400 ns pulses. The Advanced Test Accelerator (ATA) built at Livermore's Site 300 produced 10,000 Ampere beams with pulse widths of 70 ns at energies approaching 50 MeV. Several other electron and ion induction accelerators have been fabricated at LLNL and LBNL. This paper reviews the principal diagnostics developed through efforts by scientists at both laboratories for measuring the current, position, energy, and emittance of beams generated by these high current, short pulse accelerators. Many of these diagnostics are closely related to those developed for other accelerators. However, the very fast and intense current pulses often require special diagnostic techniques and considerations. The physics and design of the more unique diagnostics developed for electron induction accelerators are presented and discussed in detail

  17. DEVELOPING THE PHYSICS DESIGN FOR NDCX-II, A UNIQUE PULSE-COMPRESSING ION ACCELERATOR

    International Nuclear Information System (INIS)

    Friedman, A.; Barnard, J.J.; Cohen, R.H.; Grote, D.P.; Lund, S.M.; Sharp, W.M.; Faltens, A.; Henestroza, E.; Jung, J.-Y.; Kwan, J.W.; Lee, E.P.; Leitner, M.A.; Logan, B.G.; Vay, J.-L.; Waldron, W.L.; Davidson, R.C.; Dorf, M.; Gilson, E.P.; Kaganovich, I.

    2009-01-01

    The Heavy Ion Fusion Science Virtual National Laboratory (a collaboration of LBNL, LLNL, and PPPL) is using intense ion beams to heat thin foils to the 'warm dense matter' regime at ∼ + ions to ∼1 ns while accelerating it to 3-4 MeV over ∼15 m. Strong space charge forces are incorporated into the machine design at a fundamental level. We are using analysis, an interactive 1D PIC code (ASP) with optimizing capabilities and centroid tracking, and multi-dimensional Warpcode PIC simulations, to develop the NDCX-II accelerator. This paper describes the computational models employed, and the resulting physics design for the accelerator.

  18. Accelerating Precision Drug Development and Drug Repurposing by Leveraging Human Genetics.

    Science.gov (United States)

    Pulley, Jill M; Shirey-Rice, Jana K; Lavieri, Robert R; Jerome, Rebecca N; Zaleski, Nicole M; Aronoff, David M; Bastarache, Lisa; Niu, Xinnan; Holroyd, Kenneth J; Roden, Dan M; Skaar, Eric P; Niswender, Colleen M; Marnett, Lawrence J; Lindsley, Craig W; Ekstrom, Leeland B; Bentley, Alan R; Bernard, Gordon R; Hong, Charles C; Denny, Joshua C

    2017-04-01

    The potential impact of using human genetic data linked to longitudinal electronic medical records on drug development is extraordinary; however, the practical application of these data necessitates some organizational innovations. Vanderbilt has created resources such as an easily queried database of >2.6 million de-identified electronic health records linked to BioVU, which is a DNA biobank with more than 230,000 unique samples. To ensure these data are used to maximally benefit and accelerate both de novo drug discovery and drug repurposing efforts, we created the Accelerating Drug Development and Repurposing Incubator, a multidisciplinary think tank of experts in various therapeutic areas within both basic and clinical science as well as experts in legal, business, and other operational domains. The Incubator supports a diverse pipeline of drug indication finding projects, leveraging the natural experiment of human genetics.

  19. A customizable, scalable scheduling and reporting system.

    Science.gov (United States)

    Wood, Jody L; Whitman, Beverly J; Mackley, Lisa A; Armstrong, Robert; Shotto, Robert T

    2014-06-01

    Scheduling is essential for running a facility smoothly and for summarizing activities in use reports. The Penn State Hershey Clinical Simulation Center has developed a scheduling interface that uses off-the-shelf components, with customizations that adapt to each institution's data collection and reporting needs. The system is designed using programs within the Microsoft Office 2010 suite. Outlook provides the scheduling component, while the reporting is performed using Access or Excel. An account with a calendar is created for the main schedule, with separate resource accounts created for each room within the center. The Outlook appointment form's 2 default tabs are used, in addition to a customized third tab. The data are then copied from the calendar into either a database table or a spreadsheet, where the reports are generated.Incorporating this system into an institution-wide structure allows integration of personnel lists and potentially enables all users to check the schedule from their desktop. Outlook also has a Web-based application for viewing the basic schedule from outside the institution, although customized data cannot be accessed. The scheduling and reporting functions have been used for a year at the Penn State Hershey Clinical Simulation Center. The schedule has increased workflow efficiency, improved the quality of recorded information, and provided more accurate reporting. The Penn State Hershey Clinical Simulation Center's scheduling and reporting system can be adapted easily to most simulation centers and can expand and change to meet future growth with little or no expense to the center.

  20. Status report on the accelerators operation

    International Nuclear Information System (INIS)

    Biri, S.; Kormany, Z.; Berzi, I.; Racz, R.

    2011-01-01

    During 2011 our particle accelerators operated as scheduled, safely and without major or long breakdowns. The utilization rates of the accelerators were similar to the preceding year. The cyclotron delivered 1735 hours and the 40- years old 5 MeV Van de Graaff generator supplied more than 1900 hours. The 1 MeV Van de Graaff accelerator was also operated for several short basic physics experiments last year (84 hours) with requests for much more beamtime in 2012. The plasma and beam-on-target time at the ECR ion source was less than in previous years (322 hours) due to several time consuming technical developments in this laboratory. The isotope separator, as ion beam accelerator was utilized only for a few hours in 2011, since the research and development in this lab focused on other fields. Nevertheless it is continuously available for research requiring special deposition techniques and for isotope tracing studies. After judging and accepting the importance and quality of our accelerators and staff the title 'Strategic Research Infrastructure' was addressed to the Accelerator Center by the Hungarian authorities. In order to get access to the accelerators a new system was introduced. The beamtime (within the frames of the capacities) is available for everyone with equal chance if an acceptable scientific program is provided together with the request. The users have to contact our Program Advisory Committee (PAC). Since last year the requests - both from external or local users - must be delivered by filling out and e-sending on on-line form available in the homepage of the institute. In the next sub-chapters the 2011 operation and development details at the cyclotron, VdG-5 and ECR accelerators are summarized. Cyclotron operation. The operation of the cyclotron in 2011 was concentrated to the usual 9 months; January, July and August were reserved for maintenance and holidays. The overall working time of the accelerator was 2603 hours; the time used for systematic

  1. Scheduling for energy and reliability management on multiprocessor real-time systems

    Science.gov (United States)

    Qi, Xuan

    Scheduling algorithms for multiprocessor real-time systems have been studied for years with many well-recognized algorithms proposed. However, it is still an evolving research area and many problems remain open due to their intrinsic complexities. With the emergence of multicore processors, it is necessary to re-investigate the scheduling problems and design/develop efficient algorithms for better system utilization, low scheduling overhead, high energy efficiency, and better system reliability. Focusing cluster schedulings with optimal global schedulers, we study the utilization bound and scheduling overhead for a class of cluster-optimal schedulers. Then, taking energy/power consumption into consideration, we developed energy-efficient scheduling algorithms for real-time systems, especially for the proliferating embedded systems with limited energy budget. As the commonly deployed energy-saving technique (e.g. dynamic voltage frequency scaling (DVFS)) will significantly affect system reliability, we study schedulers that have intelligent mechanisms to recuperate system reliability to satisfy the quality assurance requirements. Extensive simulation is conducted to evaluate the performance of the proposed algorithms on reduction of scheduling overhead, energy saving, and reliability improvement. The simulation results show that the proposed reliability-aware power management schemes could preserve the system reliability while still achieving substantial energy saving.

  2. The MIT HEDP Accelerator Facility for Diagnostic Development for OMEGA, Z, and the NIF

    Science.gov (United States)

    Sio, H.; Gatu Johnson, M.; Birkel, A.; Doeg, E.; Frankel, R.; Kabadi, N. V.; Lahmann, B.; Manzin, M.; Simpson, R. A.; Parker, C. E.; Sutcliffe, G. D.; Wink, C.; Frenje, J. A.; Li, C. K.; Seguin, F. H.; Petrasso, R. D.; Leeper, R.; Hahn, K.; Ruiz, C. L.; Sangster, T. C.; Hilsabeck, T.

    2017-10-01

    The MIT HEDP Accelerator Facility utilizes a 135-keV, linear electrostatic ion accelerator; DT and DD neutron sources; and two x-ray sources for development and characterization of nuclear diagnostics for OMEGA, Z, and the NIF. The accelerator generates DD and D3He fusion products through the acceleration of D+ ions onto a 3He-doped Erbium-Deuteride target. Accurately characterized fusion product rates of around 106 s- 1 are routinely achieved. The DT and DD neutron sources generate up to 6×108 and 1×107 neutrons/s, respectively. One x-ray generator is a thick-target W source with a peak energy of 225 keV and a maximum dose rate of 12 Gy/min; the other uses Cu, Mo, or Ti elemental tubes to generate x-rays with a maximum energy of 40 keV. Diagnostics developed and calibrated at this facility include CR-39-based charged-particle spectrometers, neutron detectors, and the particle Time-Of-Flight (pTOF) and Magnetic PTOF CVD-diamond-based bang time detectors. The accelerator is also a valuable hands-on tool for graduate and undergraduate education at MIT. This work was supported in part by the U.S. DoE, SNL, LLE and LLNL.

  3. Development and evaluation of accelerated drug release testing methods for a matrix-type intravaginal ring.

    Science.gov (United States)

    Externbrink, Anna; Eggenreich, Karin; Eder, Simone; Mohr, Stefan; Nickisch, Klaus; Klein, Sandra

    2017-01-01

    Accelerated drug release testing is a valuable quality control tool for long-acting non-oral extended release formulations. Currently, several intravaginal ring candidates designed for the long-term delivery of steroids or anti-infective drugs are being in the developing pipeline. The present article addresses the demand for accelerated drug release methods for these formulations. We describe the development and evaluation of accelerated release methods for a steroid releasing matrix-type intravaginal ring. The drug release properties of the formulation were evaluated under real-time and accelerated test conditions. Under real-time test conditions drug release from the intravaginal ring was strongly affected by the steroid solubility in the release medium. Under sufficient sink conditions that were provided in release media containing surfactants drug release was Fickian diffusion driven. Both temperature and hydro-organic dissolution media were successfully employed to accelerate drug release from the formulation. Drug release could be further increased by combining the temperature effect with the application of a hydro-organic release medium. The formulation continued to exhibit a diffusion controlled release kinetic under the investigated accelerated conditions. Moreover, the accelerated methods were able to differentiate between different prototypes of the intravaginal ring that exhibited different release profiles under real-time test conditions. Overall, the results of the present study indicate that both temperature and hydro-organic release media are valid parameters for accelerating drug release from the intravaginal ring. Variation of either a single or both parameters yielded release profiles that correlated well with real-time release. Copyright © 2016 Elsevier B.V. All rights reserved.

  4. Accelerator-based BNCT.

    Science.gov (United States)

    Kreiner, A J; Baldo, M; Bergueiro, J R; Cartelli, D; Castell, W; Thatar Vento, V; Gomez Asoia, J; Mercuri, D; Padulo, J; Suarez Sandin, J C; Erhardt, J; Kesque, J M; Valda, A A; Debray, M E; Somacal, H R; Igarzabal, M; Minsky, D M; Herrera, M S; Capoulat, M E; Gonzalez, S J; del Grosso, M F; Gagetti, L; Suarez Anzorena, M; Gun, M; Carranza, O

    2014-06-01

    The activity in accelerator development for accelerator-based BNCT (AB-BNCT) both worldwide and in Argentina is described. Projects in Russia, UK, Italy, Japan, Israel, and Argentina to develop AB-BNCT around different types of accelerators are briefly presented. In particular, the present status and recent progress of the Argentine project will be reviewed. The topics will cover: intense ion sources, accelerator tubes, transport of intense beams, beam diagnostics, the (9)Be(d,n) reaction as a possible neutron source, Beam Shaping Assemblies (BSA), a treatment room, and treatment planning in realistic cases. © 2013 Elsevier Ltd. All rights reserved.

  5. Plasma Accelerator Development for Dynamic Formation of Plasma Liners: A Status Report

    Science.gov (United States)

    Thio, Y. C. Francis; Eskridge, Richard; Martin, Adam; Smith, James; Lee, Michael; Rodgers, Stephen L. (Technical Monitor)

    2001-01-01

    An experimental plasma accelerator for magnetic target fusion (MTF) applications under development at the NASA Marshall Space Flight Center is described. The accelerator is a pulsed plasma thruster and has been tested experimentally and plasma jet velocities of approximately 50 km/sec have been obtained. The plasma jet structure has been photographed with 10 ns exposure times to reveal a stable and repeatable plasma structure. Data for velocity profile information has been obtained using light pipes embedded in the gun walls to record the plasma transit at various barrel locations. Preliminary spatially resolved spectral data and magnetic field probe data are also presented. A high speed triggering system has been developed and tested as a means of reducing the gun "jitter". This jitter is being characterized and future work for second generation "ultra-low jitter" gun development is being identified.

  6. Management information system for cost-schedule integration control for nuclear power projects

    International Nuclear Information System (INIS)

    Liu Wei; Wang Yongqing; Tian Li

    2001-01-01

    Based on the project management experience abroad and at home, a cost-schedule integration control model was developed to improve nuclear power project management. The model integrates cost data with the scheduling data by unity coding to efficiently implement cost-schedule integration control on line. The software system architecture and database is designed and implemented. The system functions include estimating and forecasting dynamically cash flow, scheduling and evaluating deviation from the cost-schedule plan, etc. The research and development of the system should improve the architecture of computer integrated management information systems for nuclear power projects in China

  7. Can Accelerators Accelerate Learning?

    International Nuclear Information System (INIS)

    Santos, A. C. F.; Fonseca, P.; Coelho, L. F. S.

    2009-01-01

    The 'Young Talented' education program developed by the Brazilian State Funding Agency (FAPERJ)[1] makes it possible for high-schools students from public high schools to perform activities in scientific laboratories. In the Atomic and Molecular Physics Laboratory at Federal University of Rio de Janeiro (UFRJ), the students are confronted with modern research tools like the 1.7 MV ion accelerator. Being a user-friendly machine, the accelerator is easily manageable by the students, who can perform simple hands-on activities, stimulating interest in physics, and getting the students close to modern laboratory techniques.

  8. Can Accelerators Accelerate Learning?

    Science.gov (United States)

    Santos, A. C. F.; Fonseca, P.; Coelho, L. F. S.

    2009-03-01

    The 'Young Talented' education program developed by the Brazilian State Funding Agency (FAPERJ) [1] makes it possible for high-schools students from public high schools to perform activities in scientific laboratories. In the Atomic and Molecular Physics Laboratory at Federal University of Rio de Janeiro (UFRJ), the students are confronted with modern research tools like the 1.7 MV ion accelerator. Being a user-friendly machine, the accelerator is easily manageable by the students, who can perform simple hands-on activities, stimulating interest in physics, and getting the students close to modern laboratory techniques.

  9. Development of a RAMI model for LANSCE and high power APT accelerators

    International Nuclear Information System (INIS)

    Tallerico, P.J.

    1994-01-01

    Assessment of the reliability, availability, maintainability and inspectability (RAMI) of all high power, high cost systems is important to justify and improve the cost effectiveness of these systems. For the very large (over 100 MW) accelerator systems associated with APT, a RAMI model is very valuable in guiding the design and allocation of resources. A RAMI model of an existing machine is also valuable, since machine improvement funds must be allocated to increase the availability by the largest amount. The authors have developed a RAMI model using the critical subsystems of the LANSCE accelerator and beam delivery complex as an example and to evaluate the effectiveness for estimating reliability and beam availability. LAMPF and LANSCE together provide most of the features required for the accelerator and beam delivery part of a high-power APT machine, but LANSCE is pulsed, rather than CW. This complex is capable of a 1-MW average power H - beam, and it is the most powerful proton accelerator in the US built to date

  10. 29 CFR 825.203 - Scheduling of intermittent or reduced schedule leave.

    Science.gov (United States)

    2010-07-01

    ... leave intermittently or on a reduced leave schedule for planned medical treatment, then the employee... 29 Labor 3 2010-07-01 2010-07-01 false Scheduling of intermittent or reduced schedule leave. 825... OF LABOR OTHER LAWS THE FAMILY AND MEDICAL LEAVE ACT OF 1993 Employee Leave Entitlements Under the...

  11. ATLAS construction schedule

    CERN Multimedia

    Kotamaki, M

    The goal during the last few months has been to freeze and baseline as much as possible the schedules of various ATLAS systems and activities. The main motivations for the re-baselining of the schedules have been the new LHC schedule aiming at first collisions in early 2006 and the encountered delays in civil engineering as well as in the production of some of the detectors. The process was started by first preparing a new installation schedule that takes into account all the new external constraints and the new ATLAS staging scenario. The installation schedule version 3 was approved in the March EB and it provides the Ready For Installation (RFI) milestones for each system, i.e. the date when the system should be available for the start of the installation. TCn is now interacting with the systems aiming at a more realistic and resource loaded version 4 before the end of the year. Using the new RFI milestones as driving dates a new summary schedule has been prepared, or is under preparation, for each system....

  12. Software Schedules Missions, Aids Project Management

    Science.gov (United States)

    2008-01-01

    NASA missions require advanced planning, scheduling, and management, and the Space Agency has worked extensively to develop the programs and software suites necessary to facilitate these complex missions. These enormously intricate undertakings have hundreds of active components that need constant management and monitoring. It is no surprise, then, that the software developed for these tasks is often applicable in other high-stress, complex environments, like in government or industrial settings. NASA work over the past few years has resulted in a handful of new scheduling, knowledge-management, and research tools developed under contract with one of NASA s partners. These tools have the unique responsibility of supporting NASA missions, but they are also finding uses outside of the Space Program.

  13. Development of a system for managing document delivery schedule(DDS) for NSSS system design

    International Nuclear Information System (INIS)

    Baek, S. H.; Baek, J. M.; Sohn, Y. S.; Shon, G. H.

    1999-01-01

    The construction of nuclear power plant is a long-term project from initial design to commercial operation. To accomplish NSSS (Nuclear Steam Supply System) system design successfully, the systematic and effective method for managing the system design product and interface correspondence with other organizations is required. To meet this requirement, a system has been developed to control the document delivery schedule, approval process and interface correspondence transmittal, and to report the documentation status periodically from the beginning of the YGN 5 and 6 project. This system is expected to contribute as the beginning step to development of integrated project management system. (author)

  14. The intense proton accelerator program

    International Nuclear Information System (INIS)

    Kaneko, Yoshihiko

    1990-01-01

    The Science and Technology Agency of Japan has formulated the OMEGA project, in which incineration of nuclear wastes by use of accelerators is defined as one of the important tasks. Japan Atomic Energy Research Institute (JAERI) has been engaged for several years in basic studies in incineration technology with use of an intense proton linear accelerator. The intense proton accelerator program intends to provide a large scale proton linear accelerator called Engineering Test Accelerator. The principal purpose of the accelerator is to develop nuclear waste incineration technology. The accelerator will also be used for other industrial applications and applied science studies. The present report further outlines the concept of incineration of radio-activities of nuclear wastes, focusing on nuclear reactions and a concept of incineration plant. Features of Engineering Test Accelerator are described focusing on the development of the accelerator, and research and development of incineration technology. Applications of science and technology other than nuclear waste incineration are also discussed. (N.K.)

  15. Evaluation of Selected Resource Allocation and Scheduling Methods in Heterogeneous Many-Core Processors and Graphics Processing Units

    Directory of Open Access Journals (Sweden)

    Ciznicki Milosz

    2014-12-01

    Full Text Available Heterogeneous many-core computing resources are increasingly popular among users due to their improved performance over homogeneous systems. Many developers have realized that heterogeneous systems, e.g. a combination of a shared memory multi-core CPU machine with massively parallel Graphics Processing Units (GPUs, can provide significant performance opportunities to a wide range of applications. However, the best overall performance can only be achieved if application tasks are efficiently assigned to different types of processor units in time taking into account their specific resource requirements. Additionally, one should note that available heterogeneous resources have been designed as general purpose units, however, with many built-in features accelerating specific application operations. In other words, the same algorithm or application functionality can be implemented as a different task for CPU or GPU. Nevertheless, from the perspective of various evaluation criteria, e.g. the total execution time or energy consumption, we may observe completely different results. Therefore, as tasks can be scheduled and managed in many alternative ways on both many-core CPUs or GPUs and consequently have a huge impact on the overall computing resources performance, there are needs for new and improved resource management techniques. In this paper we discuss results achieved during experimental performance studies of selected task scheduling methods in heterogeneous computing systems. Additionally, we present a new architecture for resource allocation and task scheduling library which provides a generic application programming interface at the operating system level for improving scheduling polices taking into account a diversity of tasks and heterogeneous computing resources characteristics.

  16. Superconducting accelerator technology

    International Nuclear Information System (INIS)

    Grunder, H.A.; Hartline, B.K.

    1986-01-01

    Modern and future accelerators for high energy and nuclear physics rely increasingly on superconducting components to achieve the required magnetic fields and accelerating fields. This paper presents a practical overview of the phenomenon of superconductivity, and describes the design issues and solutions associated with superconducting magnets and superconducting rf acceleration structures. Further development and application of superconducting components promises increased accelerator performance at reduced electric power cost

  17. New Accelerator Projects

    International Nuclear Information System (INIS)

    Delahaye, J.P.

    2010-01-01

    There is large number of ambitious accelerator projects with promising performances in the near (and short term) future which aims at exploring energy and/or luminosity frontiers and Complementary aspects of various particles species. High Energy Physics requirements are extremely demanding with challenging parameters: entering into the new territories of the tera-scale data, high Energy or/and High (Integrated) Luminosity, high performance, high availability, long lifetime, luminosity leveling etc.. New projects are more and more challenging: larger, more powerful, more expensive, technology above present standard. Innovative ideas and breakthrough on novel technologies are key for HEP adventure. Aggressive R and D is imperative on beam and Technology related, on cost and power consumption mitigation.. There is ambitious Test Facilities to address feasibility. More and more time and (M and P) resources are required from first ideas to project proposal: it is of prime importance to launch R and D early, explore all possible options of schemes and technologies (anticipating future Physics requests), make realistic status and schedule estimates (preserve credibility and make reasonable plans). Global Collaboration is mandatory from the R and D phase to the construction and operation in order to make best use of limited resources and available expertise as inspired from successful collaborations on Detectors. The global strategy of new accelerator projects in truly world-wide collaboration aims at: - defining all various Projects and Technology options worth exploring, - taking advantage of global teams made of world-wide experts, and of synergies to address common issues (generic R and D) of various projects, - preparing together plethora of project proposals to cover Physics Landscape (ready for window opportunity), - developing Collaborative/Competition (Experts in Collaboration, Technology and Projects options in Competition), - Joining resources on (few) selected

  18. Diagnostics for induction accelerators

    International Nuclear Information System (INIS)

    Fessenden, T.J.

    1997-01-01

    The induction accelerator was conceived by N. C. Christofilos and first realized as the Astron accelerator that operated at Lawrence Livermore National Laboratory (LLNL) from the early 1960s to the end of 1975. This accelerator generated electron beams at energies near 6 MeV with typical currents of 600 Amperes in 400-ns pulses. The Advanced Test Accelerator (ATA) built at Livermore close-quote s Site 300 produced 10,000-Ampere beams with pulse widths of 70 ns at energies approaching 50 MeV. Several other electron and ion induction accelerators have been fabricated at LLNL and Lawrence Berkeley National Laboratory (LBNL). This paper reviews the principal diagnostics developed through efforts by scientists at both laboratories for measuring the current, position, energy, and emittance of beams generated by these high-current, short-pulse accelerators. Many of these diagnostics are closely related to those developed for other accelerators. However, the very fast and intense current pulses often require special diagnostic techniques and considerations. The physics and design of the more unique diagnostics developed for electron induction accelerators are presented and discussed in detail. copyright 1997 American Institute of Physics

  19. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1995-02-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the U.S. Department of Energy (DOE). This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring onsite drinking water falls outside the scope of the SESP. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control, and reporting. The ground-water sampling schedule identifies ground-water sampling .events used by PNL for environmental surveillance of the Hanford Site. Sampling is indicated as annual, semi-annual, quarterly, or monthly in the sampling schedule. Some samples are collected and analyzed as part of ground-water monitoring and characterization programs at Hanford (e.g. Resources Conservation and Recovery Act (RCRA), Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), or Operational). The number of samples planned by other programs are identified in the sampling schedule by a number in the analysis column and a project designation in the Cosample column. Well sampling events may be merged to avoid redundancy in cases where sampling is planned by both-environmental surveillance and another program

  20. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1995-02-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the U.S. Department of Energy (DOE). This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring onsite drinking water falls outside the scope of the SESP. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control, and reporting. The ground-water sampling schedule identifies ground-water sampling .events used by PNL for environmental surveillance of the Hanford Site. Sampling is indicated as annual, semi-annual, quarterly, or monthly in the sampling schedule. Some samples are collected and analyzed as part of ground-water monitoring and characterization programs at Hanford (e.g. Resources Conservation and Recovery Act (RCRA), Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), or Operational). The number of samples planned by other programs are identified in the sampling schedule by a number in the analysis column and a project designation in the Cosample column. Well sampling events may be merged to avoid redundancy in cases where sampling is planned by both-environmental surveillance and another program.

  1. Accelerating Value Creation with Accelerators

    DEFF Research Database (Denmark)

    Jonsson, Eythor Ivar

    2015-01-01

    and developing the best business ideas and support the due diligence process. Even universities are noticing that the learning experience of the action learning approach is an effective way to develop capabilities and change cultures. Accelerators related to what has historically been associated...

  2. The application of artificial intelligence to astronomical scheduling problems

    Science.gov (United States)

    Johnston, Mark D.

    1992-01-01

    Efficient utilization of expensive space- and ground-based observatories is an important goal for the astronomical community; the cost of modern observing facilities is enormous, and the available observing time is much less than the demand from astronomers around the world. The complexity and variety of scheduling constraints and goals has led several groups to investigate how artificial intelligence (AI) techniques might help solve these kinds of problems. The earliest and most successful of these projects was started at Space Telescope Science Institute in 1987 and has led to the development of the Spike scheduling system to support the scheduling of Hubble Space Telescope (HST). The aim of Spike at STScI is to allocate observations to timescales of days to a week observing all scheduling constraints and maximizing preferences that help ensure that observations are made at optimal times. Spike has been in use operationally for HST since shortly after the observatory was launched in Apr. 1990. Although developed specifically for HST scheduling, Spike was carefully designed to provide a general framework for similar (activity-based) scheduling problems. In particular, the tasks to be scheduled are defined in the system in general terms, and no assumptions about the scheduling timescale are built in. The mechanisms for describing, combining, and propagating temporal and other constraints and preferences are quite general. The success of this approach has been demonstrated by the application of Spike to the scheduling of other satellite observatories: changes to the system are required only in the specific constraints that apply, and not in the framework itself. In particular, the Spike framework is sufficiently flexible to handle both long-term and short-term scheduling, on timescales of years down to minutes or less. This talk will discuss recent progress made in scheduling search techniques, the lessons learned from early HST operations, the application of Spike

  3. Accelerated color development of irradiated radiochromic dye films

    International Nuclear Information System (INIS)

    Chappas, W.J.

    1981-01-01

    The radiochromic dye films developed by Chalkley and McLaughlin are quickly becoming one of the principal methods for secondary dosimetry. Their useful dose and dose rate ranges, long-term color stability, small and flexible size, and ease of reading make them ideal for spatial dose distribution measurements in the complex targets often encountered in industry. At room temperature, however, their response is slow, requiring several hours after irradiation for full color development. This work examines the effect of humidity on the film's time response and describes a method for accelerating the film's color development. By keeping the film in a controlled humidity environment or through a simple heating technique, the film can be read in minutes instead of hours after irradiation. The results are shown to be identical to those of films stored for 24 hours at room temperature

  4. Maternal Nonstandard Work Schedules and Child Cognitive Outcomes

    Science.gov (United States)

    Han, Wen-Jui

    2005-01-01

    This paper examined associations between mothers' work schedules and children's cognitive outcomes in the first 3 years of life for approximately 900 children from the National Institute of Child Health and Human Development Study of Early Child Care. Both the timing and duration of maternal nonstandard work schedules were examined. Although…

  5. Development of a high repetition rate laser-plasma accelerator for ultra-fast electron diffraction experiments

    International Nuclear Information System (INIS)

    Beaurepaire, B.

    2009-01-01

    Electronic microscopy and electron diffraction allowed the understanding of the organization of atoms in matter. Using a temporally short source, one can measure atomic displacements or modifications of the electronic distribution in matter. To date, the best temporal resolution for time resolved diffraction experiments is of the order of a hundred femto-seconds (fs). Laser accelerators are good candidates to reach the femtosecond temporal resolution in electron diffraction experiments. Such accelerators used to work at a low repetition rate, so that it was necessary to develop a new one operating at a high repetition rate in order to accumulate a large amount of data. In this thesis, a laser-plasma accelerator operating at the kHz repetition rate was developed and built. This source generates electron bunches at 100 keV from 3 mJ and 25 fs laser pulses. The physics of the acceleration has been studied, and the effect of the laser wavefront on the electron transverse distribution has been demonstrated. (author)

  6. LIBO accelerates

    CERN Multimedia

    2002-01-01

    The prototype module of LIBO, a linear accelerator project designed for cancer therapy, has passed its first proton-beam acceleration test. In parallel a new version - LIBO-30 - is being developed, which promises to open up even more interesting avenues.

  7. CAS CERN Accelerator School superconductivity in particle accelerators

    International Nuclear Information System (INIS)

    Turner, S.

    1989-01-01

    One of the objectives of the CERN Accelerator School is to run courses on specialised topics in the particle accelerator field. The present volume contains the proceedings of one such course, this time organized in conjunction with the Deutsches Elektronen Synchrotron (DESY) on the subject of superconductivity in particle accelerators. This course reflects the very considerable progress made over the last few years in the use of the technology for the magnet and radio-frequency systems of many large and small accelerators already in use or nearing completion, while also taking account of the development work now going on for future machines. The lectures cover the theory of superconductivity, cryogenics and accelerator magnets and cavities, while the seminars include superfluidity, superconductors, special magnets and the prospects for high-temperature superconductors. (orig.)

  8. Static Schedulers for Embedded Real-Time Systems

    Science.gov (United States)

    1989-12-01

    Because of the need for having efficient scheduling algorithms in large scale real time systems , software engineers put a lot of effort on developing...provide static schedulers for he Embedded Real Time Systems with single processor using Ada programming language. The independent nonpreemptable...support the Computer Aided Rapid Prototyping for Embedded Real Time Systems so that we determine whether the system, as designed, meets the required

  9. Study of the Accelerator Technology Development for Cancer Radiotherapy

    International Nuclear Information System (INIS)

    Sudjatmoko; Triyono; E-Supriyatni

    2000-01-01

    The hadronic particle beams including both protons, neutrons and charged particles have been studied for cancer therapy by a number of research centers in several countries during the past two decades. In this paper is briefly discussed concerning the accelerator type and its applications. The future trends are seen in the new technological developments like the use of proton gantries, beam scanning techniques, improved patient handling system and in the increasing precision of treatment. (author)

  10. Initial investigation into development of accelerated pavement evaluation (APE) vehicle

    CSIR Research Space (South Africa)

    Steyn, WJvdM

    2002-08-01

    Full Text Available n e n t d e f o r m a t i o n [ m m ] Test 1 Test 2 Test 3 Test 4 Initial indication of performance Indication of performance after traffic application TR-2003/9: Initial investigation into development of APE vehicle. 6 2... Restricted Contract Report Initial Investigation into Development of Accelerated Pavement Evaluation (APE) Vehicle. Author: WJvdM Steyn M de Beer PREPARED FOR: PREPARED BY: CSIR Transportek STEP CSIR Transportek PO...

  11. Exclusive Preference Develops Less Readily on Concurrent Ratio Schedules with Wheel-Running than with Sucrose Reinforcement

    Science.gov (United States)

    Belke, Terry W.

    2010-01-01

    Previous research suggested that allocation of responses on concurrent schedules of wheel-running reinforcement was less sensitive to schedule differences than typically observed with more conventional reinforcers. To assess this possibility, 16 female Long Evans rats were exposed to concurrent FR FR schedules of reinforcement and the schedule…

  12. Simultaneous optimization of planning and scheduling in an oil refinery

    NARCIS (Netherlands)

    Zondervan, E.; van Boekel, T.P.J.; Fransoo, J.C.; Haan, de A.B.; Postikopoulos, E.N.; Georgiadis, M.C.; Kokossis, A.

    2011-01-01

    In earlier work we have developed and tested a scheduling model [1] in the AIMMS software. In this follow-up contribution we will develop a planning model. Next we will identify the information flow between scheduling model and the planning model. Lastly we will integrate the two models in a

  13. Niobium Coatings for the HIE-ISOLDE QWR Superconducting Accelerating Cavities

    CERN Document Server

    Jecklin, N; Delaup, B; Ferreira, L; Mondino, I; Sublet, A; Therasse, M; Venturini Desolaro, W

    2013-01-01

    The HIE-ISOLDE (High Intensity and Energy at ISOLDE) project is the upgrade of the existing ISOLDE (Isotope Separator On Line DEvice) facility at CERN, which is dedicated to the production of a large variety of radioactive ion beams for nuclear physics experiments. A new linear accelerator made of 20 ȕ=10.3% and 12 ȕ=6.3% quarter-wave resonators (QWR) superconducting (SC) accelerating cavities at 101 MHz will be built, and in a first phase two cryomodules of 5 high-ȕ cavities each are scheduled to accelerate first beams in 2015. The cavities are made of a copper substrate, with a sputter-coated superconductive niobium (Nb) layer, operated at 4.5 K with an accelerating field of 6 MV/m at 10W Radio-Frequency (RF) losses (Q=4.5· 108). In this paper we will discuss the baseline surface treatment and coating procedure which allows obtaining the required performance, as well as the steps undertaken in order to prepare series production of the required number of cavities guaranteeing their quality and functional...

  14. Development and use of schedules in education of elementary school children with ASD

    Directory of Open Access Journals (Sweden)

    Sharova Y.A.

    2015-09-01

    Full Text Available The work on preparedness for education of elementary school students with autism disorders can be greatly facilitated by the use of the methods that allow to structure child's knowledge about necessary changes. The use of schedules greatly facilitates the process of education, guiding and work on children's adaptation. The article describes stages of the work on inclusion and use of general and individual schedules in two groups of children with intellectual disabilities and autism spectrum disorders in preschool classes. This work was conducted in the Center for Psychological, Medical and Social Support to Children and Adolescents of the Moscow State University of Psychology and Education. The article contains examples of the use schedules to increase independence and to reduce anxiety in children with autism spectrum disorders.

  15. Understanding the costs and schedule of hydroelectric projects

    International Nuclear Information System (INIS)

    Merrow, E.W.; Schroeder, B.R.

    1991-01-01

    This paper is based on a study conducted for the World Bank which evaluated the feasibility of developing an empirically based ex ante project analysis system for hydroelectric projects. The system would be used to assess: the reasonableness of engineering-based cost and schedule estimates used for project appraisal and preliminary estimates used to select projects for appraisal; and the potential for cost growth and schedule slip. The system would help identify projects early in the project appraisal process that harbor significantly higher than normal risks of overrunning cost and schedule estimates

  16. High intensity linear accelerator development topics for panel discussion on ''Nuclear Energy Research and Accelerators: Future Prospects''

    International Nuclear Information System (INIS)

    Jameson, R.A.

    1989-01-01

    Two companion papers at this meeting have introduced the subject of high intensity linacs for materials research and for radioactive waste transmutation; Prof. Kaneko's paper ''Intense Proton Accelerator,'' and my paper ''Accelerator-Based Intense Neutron Source for Materials R ampersand D.'' I will expand on those remarks to briefly outline some of the extensive work that has been done at Los Alamos toward those two application areas, plus a third --- the production of tritium in an accelerator-based facility (APT--Accelerator Production of Tritium). 1 ref., 11 figs

  17. Designing a fuzzy scheduler for hard real-time systems

    Science.gov (United States)

    Yen, John; Lee, Jonathan; Pfluger, Nathan; Natarajan, Swami

    1992-01-01

    In hard real-time systems, tasks have to be performed not only correctly, but also in a timely fashion. If timing constraints are not met, there might be severe consequences. Task scheduling is the most important problem in designing a hard real-time system, because the scheduling algorithm ensures that tasks meet their deadlines. However, the inherent nature of uncertainty in dynamic hard real-time systems increases the problems inherent in scheduling. In an effort to alleviate these problems, we have developed a fuzzy scheduler to facilitate searching for a feasible schedule. A set of fuzzy rules are proposed to guide the search. The situation we are trying to address is the performance of the system when no feasible solution can be found, and therefore, certain tasks will not be executed. We wish to limit the number of important tasks that are not scheduled.

  18. The Next Linear Collider Test Accelerator

    International Nuclear Information System (INIS)

    Ruth, R.D.; Adolphsen, C.; Bane, K.

    1993-04-01

    During the past several years, there has been tremendous progress the development of the RF system and accelerating structures for a Next Linear Collider (NLC). Developments include high-power klystrons, RF pulse compression systems and damped/detuned accelerator structures to reduce wakefields. In order to integrate these separate development efforts into an actual X-band accelerator capable of accelerating the electron beams necessary for an NLC, we are building an NLC Test Accelerator (NLCTA). The goal of the NLCTA is to bring together all elements of the entire accelerating system by constructing and reliably operating an engineered model of a high-gradient linac suitable for the NLC. The NLCTA will serve as a testbed as the design of the NLC evolves. In addition to testing the RF acceleration system, the NLCTA is designed to address many questions related to the dynamics of the beam during acceleration. In this paper, we will report oil the status of the design, component development, and construction of the NLC Test Accelerator

  19. Project schedule and cost estimate report

    International Nuclear Information System (INIS)

    1988-03-01

    All cost tables represent obligation dollars, at both a constant FY 1987 level and an estimated escalation level, and are based on the FY 1989 DOE Congressional Budget submittal of December 1987. The cost tables display the total UMTRA Project estimated costs, which include both Federal and state funding. The Total Estimated Cost (TEC) for the UMTRA Project is approximately $992.5 million (in 1987 escalated dollars). Project schedules have been developed that provide for Project completion by September 1994, subject to Congressional approval extending DOE's authorization under Public Law 95-604. The report contains site-specific demographic data, conceptual design assumptions, preliminary cost estimates, and site schedules. A general project overview is also presented, which includes a discussion of the basis for the schedule and cost estimates, contingency assumptions, work breakdown structure, and potential project risks. The schedules and cost estimates will be revised as necessary to reflect appropriate decisions relating to relocation of certain tailings piles, or other special design considerations or circumstances (such as revised EPA groundwater standards), and changes in the Project mission. 27 figs', 97 tabs

  20. Scheduling for decommissioning projects

    International Nuclear Information System (INIS)

    Podmajersky, O.E.

    1987-01-01

    This paper describes the Project Scheduling system being employed by the Decommissioning Operations Contractor at the Shippingport Station Decommissioning Project (SSDP). Results from the planning system show that the project continues to achieve its cost and schedule goals. An integrated cost and schedule control system (C/SCS) which uses the concept of earned value for measurement of performance was instituted in accordance with DOE orders. The schedule and cost variances generated by the C/SCS system are used to confirm management's assessment of project status. This paper describes the types of schedules and tools used on the SSDP project to plan and monitor the work, and identifies factors that are unique to a decommissioning project that make scheduling critical to the achievement of the project's goals. 1 fig

  1. Program reference schedule baseline

    International Nuclear Information System (INIS)

    1986-07-01

    This Program Reference Schedule Baseline (PRSB) provides the baseline Program-level milestones and associated schedules for the Civilian Radioactive Waste Management Program. It integrates all Program-level schedule-related activities. This schedule baseline will be used by the Director, Office of Civilian Radioactive Waste Management (OCRWM), and his staff to monitor compliance with Program objectives. Chapter 1 includes brief discussions concerning the relationship of the PRSB to the Program Reference Cost Baseline (PRCB), the Mission Plan, the Project Decision Schedule, the Total System Life Cycle Cost report, the Program Management Information System report, the Program Milestone Review, annual budget preparation, and system element plans. Chapter 2 includes the identification of all Level 0, or Program-level, milestones, while Chapter 3 presents and discusses the critical path schedules that correspond to those Level 0 milestones

  2. Role of advanced RF/microwave technology and high power switch technology for developing/upgrading compact/existing accelerators

    International Nuclear Information System (INIS)

    Shrivastava, Purushottam

    2001-01-01

    With the advances in high power microwave devices as well as in microwave technologies it has become possible to go on higher frequencies at higher powers as well as to go for newer devices which are more efficient and compact and hence reducing the power needs as well as space and weight requirement for accelerators. New devices are now available in higher frequency spectrum for example at C-Band, X-band and even higher. Also new devices like klystrodes/Higher Order Mode Inductive Output Tubes (HOM IOTs) are now becoming competitors for existing tubes which are in use at present accelerator complexes. The design/planning of the accelerators used for particle physics research, medical accelerators, industrial irradiation, or even upcoming Driver Accelerators for Sub Critical Reactors for nuclear power generation are being done taking into account the newer technologies. The accelerators which use magnetrons, klystrons and similar devices at S-Band can be modified/redesigned with devices at higher frequencies like X-Band. Pulsed accelerators need high power high voltage pulsed modulators whereas CW accelerators need high voltage power supplies for functioning of RF / Microwave tubes. There had been a remarkable growth in the development and availability of solid state switches both for switching the pulsed modulators for microwave tubes as well as for making high frequency switch mode power supplies. Present paper discusses some of the advanced devices/technologies in this field as well as their capability to make advanced/compact/reliable accelerators. Microwave systems developed/under development at Centre for Advanced Technology are also discussed briefly along with some of the efforts done to make them compact. An overview of state of art vacuum tube devices and solid state switch technologies is given. (author)

  3. Multi-agent Pareto appointment exchanging in hospital patient scheduling

    NARCIS (Netherlands)

    I.B. Vermeulen (Ivan); S.M. Bohte (Sander); D.J.A. Somefun (Koye); J.A. La Poutré (Han)

    2007-01-01

    htmlabstractWe present a dynamic and distributed approach to the hospital patient scheduling problem, in which patients can have multiple appointments that have to be scheduled to different resources. To efficiently solve this problem we develop a multi-agent Pareto-improvement appointment

  4. Multi-agent Pareto appointment exchanging in hospital patient scheduling

    NARCIS (Netherlands)

    Vermeulen, I.B.; Bohté, S.M.; Somefun, D.J.A.; Poutré, La J.A.

    2007-01-01

    We present a dynamic and distributed approach to the hospital patient scheduling problem, in which patients can have multiple appointments that have to be scheduled to different resources. To efficiently solve this problem we develop a multi-agent Pareto-improvement appointment exchanging algorithm:

  5. Second-order schedules of token reinforcement with pigeons: effects of fixed- and variable-ratio exchange schedules.

    Science.gov (United States)

    Foster, T A; Hackenberg, T D; Vaidya, M

    2001-09-01

    Pigeons' key pecks produced food under second-order schedules of token reinforcement, with light-emitting diodes serving as token reinforcers. In Experiment 1, tokens were earned according to a fixed-ratio 50 schedule and were exchanged for food according to either fixed-ratio or variable-ratio exchange schedules, with schedule type varied across conditions. In Experiment 2, schedule type was varied within sessions using a multiple schedule. In one component, tokens were earned according to a fixed-ratio 50 schedule and exchanged according to a variable-ratio schedule. In the other component, tokens were earned according to a variable-ratio 50 schedule and exchanged according to a fixed-ratio schedule. In both experiments, the number of responses per exchange was varied parametrically across conditions, ranging from 50 to 400 responses. Response rates decreased systematically with increases in the fixed-ratio exchange schedules, but were much less affected by changes in the variable-ratio exchange schedules. Response rates were consistently higher under variable-ratio exchange schedules than tinder comparable fixed-ratio exchange schedules, especially at higher exchange ratios. These response-rate differences were due both to greater pre-ratio pausing and to lower local rates tinder the fixed-ratio exchange schedules. Local response rates increased with proximity to food under the higher fixed-ratio exchange schedules, indicative of discriminative control by the tokens.

  6. Collective ion acceleration

    International Nuclear Information System (INIS)

    Godfrey, B.B.; Faehl, R.J.; Newberger, B.S.; Shanahan, W.R.; Thode, L.E.

    1977-01-01

    Progress achieved in the understanding and development of collective ion acceleration is presented. Extensive analytic and computational studies of slow cyclotron wave growth on an electron beam in a helix amplifier were performed. Research included precise determination of linear coupling between beam and helix, suppression of undesired transients and end effects, and two-dimensional simulations of wave growth in physically realizable systems. Electrostatic well depths produced exceed requirements for the Autoresonant Ion Acceleration feasibility experiment. Acceleration of test ions to modest energies in the troughs of such waves was also demonstrated. Smaller efforts were devoted to alternative acceleration mechanisms. Langmuir wave phase velocity in Converging Guide Acceleration was calculated as a function of the ratio of electron beam current to space-charge limiting current. A new collective acceleration approach, in which cyclotron wave phase velocity is varied by modulation of electron beam voltage, is proposed. Acceleration by traveling Virtual Cathode or Localized Pinch was considered, but appears less promising. In support of this research, fundamental investigations of beam propagation in evacuated waveguides, of nonneutral beam linear eigenmodes, and of beam stability were carried out. Several computer programs were developed or enhanced. Plans for future work are discussed

  7. Fixed Schedules Can Support 21st-Century Skills

    Science.gov (United States)

    Formanack, Gail; Pietsch, Laura

    2011-01-01

    The common belief among school librarians is that a flexibly scheduled school library program as opposed to a fixed schedule program is the best choice. After all, there are distinct advantages to the flexible program: students are served at the point of need, skills are not taught in isolation, and collaborative lessons are developed with…

  8. PROMSYS, Plant Equipment Maintenance and Inspection Scheduling

    International Nuclear Information System (INIS)

    Morgan, D.L.; Srite, B.E.

    1986-01-01

    1 - Description of problem or function: PROMSYS is a computer system designed to automate the scheduling of routine maintenance and inspection of plant equipment. This 'programmed maintenance' provides the detailed planning and accomplishment of lubrication, inspection, and similar repetitive maintenance activities which can be scheduled at specified predetermined intervals throughout the year. The equipment items included are the typical pumps, blowers, motors, compressors, automotive equipment, refrigeration units, filtering systems, machine shop equipment, cranes, elevators, motor-generator sets, and electrical switchgear found throughout industry, as well as cell ventilation, shielding, containment, and material handling equipment unique to nuclear research and development facilities. Four related programs are used to produce sorted schedule lists, delinquent work lists, and optional master lists. Five additional programs are used to create and maintain records of all scheduled and unscheduled maintenance history. 2 - Method of solution: Service specifications and frequency are established and stored. The computer program reviews schedules weekly and prints, on schedule cards, instructions for service that is due the following week. The basic output from the computer program comes in two forms: programmed-maintenance schedule cards and programmed-maintenance data sheets. The data sheets can be issued in numerical building, route, and location number sequence as equipment lists, grouped for work assigned to a particular foreman as the foreman's equipment list, or grouped by work charged to a particular work order as the work-order list. Data sheets grouped by equipment classification are called the equipment classification list

  9. IRRIGATION SCHEDULING CALCULATOR (ISC TO IMPROVE WATER MANAGEMENT ON FIELD LEVEL IN EGYPT

    Directory of Open Access Journals (Sweden)

    Samiha Abou El-Fetouh Hamed Ouda

    2017-10-01

    Full Text Available The developed model is MS excel sheet called “Irrigation Scheduling Calculator, ISC”. The model requires to input daily weather data to calculate daily evapotranspiration using Penman-Monteith equation. The model calculates water depletion from the root zone to determine when to irrigate and how much water should be applied. The charge from irrigation pump is used to calculate how many hours should the farmer run the pump to deliver the needed amount of water. ISC model was used to developed irrigation schedule for wheat and maize planted in El-Gharbia governorate. The developed schedules were compared to the actual schedules for both crops. Furthermore, CropSyst model was calibrated for both crops and run using the developed schedules by ISC model. The simulation results indicated that the calculated irrigation amount by ISC model for wheat was lower than actual schedule by 6.0 mm. Furthermore, the simulated wheat productivity by CropSyst was higher than measured grain and biological by 2%. Similarly, the calculated applied irrigation amount by ISC model for maize was lower than actual schedule by 79.0 mm and the productivity was not changed.

  10. Application of high power modulated intense relativistic electron beams for development of Wake Field Accelerator

    International Nuclear Information System (INIS)

    Friedman, M.

    1989-01-01

    This final Progress Report addresses DOE-sponsored research on the development of future high-gradient particle accelerators. The experimental and the theoretical research, which lasted three years, investigated the Two Beam Accelerator (TBA). This high-voltage-gradient accelerator was powered by a modulated intense relativistic electron beam (MIREB) of power >10 10 watts. This research was conceived after a series of successful experiments performed at NRL generating and using MIREBs. This work showed that an RF structure could be built which was directly powered by a modulated intense relativistic electron beam. This structure was then used to accelerate a second electron beam. At the end of the three year project the proof-of-principle accelerator demonstrated the generation of a high current beam of electrons with energy >60 MeV. Scaling laws needed to design practical devices for future applications were also derived

  11. Accelerating cleanup: Paths to closure

    International Nuclear Information System (INIS)

    1998-06-01

    This report describes the status of Environmental Management's (EM's) cleanup program and a direction forward to complete achievement of the 2006 vision. Achieving the 2006 vision results in significant benefits related to accomplishing EM program objectives. As DOE sites accelerate cleanup activities, risks to public health, the environment, and worker safety and health are all reduced. Finding more efficient ways to conduct work can result in making compliance with applicable environmental requirements easier to achieve. Finally, as cleanup activities at sites are completed, the EM program can focus attention and resources on the small number of sites with more complex cleanup challenges. Chapter 1 describes the process by which this report has been developed and what it hopes to accomplish, its relationship to the EM decision-making process, and a general background of the EM mission and program. Chapter 2 describes how the site-by-site projections were constructed, and summarizes, for each of DOE's 11 Operations/Field Offices, the projected costs and schedules for completing the cleanup mission. Chapter 3 presents summaries of the detailed cleanup projections from three of the 11 Operations/Field Offices: Rocky Flats (Colorado), Richland (Washington), and Savannah River (South Carolina). The remaining eight Operations/Field Office summaries are in Appendix E. Chapter 4 reviews the cost drivers, budgetary constraints, and performance enhancements underlying the detailed analysis of the 353 projects that comprise EM's accelerated cleanup and closure effort. Chapter 5 describes a management system to support the EM program. Chapter 6 provides responses to the general comments received on the February draft of this document

  12. Microcomputer-based workforce scheduling for hospital porters.

    Science.gov (United States)

    Lin, C K

    1999-01-01

    This paper focuses on labour scheduling for hospital porters who are the major workforce providing routine cleansing of wards, transportation and messenger services. Generating an equitable monthly roster for porters while meeting the daily minimum demand is a tedious task scheduled manually by a supervisor. In considering a variety of constraints and goals, a manual schedule was usually produced in seven to ten days. To be in line with the strategic goal of scientific management of an acute care regional hospital in Hong Kong, a microcomputer-based algorithm was developed to schedule the monthly roster. The algorithm, coded in Digital Visual Fortran 5.0 Professional, could generate a monthly roster in seconds. Implementation has been carried out since September 1998 and the results proved to be useful to hospital administrators and porters. This paper discusses both the technical and human issues involved during the computerization process.

  13. Perceptions of randomized security schedules.

    Science.gov (United States)

    Scurich, Nicholas; John, Richard S

    2014-04-01

    Security of infrastructure is a major concern. Traditional security schedules are unable to provide omnipresent coverage; consequently, adversaries can exploit predictable vulnerabilities to their advantage. Randomized security schedules, which randomly deploy security measures, overcome these limitations, but public perceptions of such schedules have not been examined. In this experiment, participants were asked to make a choice between attending a venue that employed a traditional (i.e., search everyone) or a random (i.e., a probability of being searched) security schedule. The absolute probability of detecting contraband was manipulated (i.e., 1/10, 1/4, 1/2) but equivalent between the two schedule types. In general, participants were indifferent to either security schedule, regardless of the probability of detection. The randomized schedule was deemed more convenient, but the traditional schedule was considered fairer and safer. There were no differences between traditional and random schedule in terms of perceived effectiveness or deterrence. Policy implications for the implementation and utilization of randomized schedules are discussed. © 2013 Society for Risk Analysis.

  14. Rapid application development by KEKB accelerator operators using EPICS/Python

    International Nuclear Information System (INIS)

    Tanaka, M.; Satoh, Y.; Kitabayashi, T.

    2004-01-01

    In the KEKB accelerator facility, the control system is constructed based on the framework of EPICS. By using EPICS/Python API, which is originated from KEK, we can develop an EPICS channel access application based on simple Python technology with only a few knowledge of EPICS channel access protocols. The operator's new tuning ideas are quickly implemented to the control system. In this paper, we introduce the EPICS/Python API and report the effectiveness of rapid application development by the KEKB operators using the API. (author)

  15. Community petascale project for accelerator science and simulation: Advancing computational science for future accelerators and accelerator technologies

    International Nuclear Information System (INIS)

    Spentzouris, P.; Cary, J.; McInnes, L.C.; Mori, W.; Ng, C.; Ng, E.; Ryne, R.

    2008-01-01

    The design and performance optimization of particle accelerators are essential for the success of the DOE scientific program in the next decade. Particle accelerators are very complex systems whose accurate description involves a large number of degrees of freedom and requires the inclusion of many physics processes. Building on the success of the SciDAC-1 Accelerator Science and Technology project, the SciDAC-2 Community Petascale Project for Accelerator Science and Simulation (ComPASS) is developing a comprehensive set of interoperable components for beam dynamics, electromagnetics, electron cooling, and laser/plasma acceleration modelling. ComPASS is providing accelerator scientists the tools required to enable the necessary accelerator simulation paradigm shift from high-fidelity single physics process modeling (covered under SciDAC1) to high-fidelity multiphysics modeling. Our computational frameworks have been used to model the behavior of a large number of accelerators and accelerator R and D experiments, assisting both their design and performance optimization. As parallel computational applications, the ComPASS codes have been shown to make effective use of thousands of processors.

  16. Accelerator and RF system development for NLC

    International Nuclear Information System (INIS)

    Vlieks, A.E.; Callin, R.; Deruyter, H.; Early, R.; Fant, K.S.; Farkas, Z.D.; Fowkes, W.R.; Galloway, C.; Hoag, H.A.; Koontz, R.

    1993-01-01

    An experimental station for an X-band Next Linear Collider has been constructed at SLAC. This station consists of a klystron and modulator, a low-loss waveguide system for rf power distribution, a SLED II pulse-compression and peak-power multiplication system, acceleration sections and beam-line components (gun, pre-buncher, pre-accelerator, focussing elements, and spectrometer). An extensive program of experiments to evaluate the performance of all components is underway. The station is described in detail in this paper, and results to date are presented

  17. Scheduling language and algorithm development study. Volume 1, phase 2: Design considerations for a scheduling and resource allocation system

    Science.gov (United States)

    Morrell, R. A.; Odoherty, R. J.; Ramsey, H. R.; Reynolds, C. C.; Willoughby, J. K.; Working, R. D.

    1975-01-01

    Data and analyses related to a variety of algorithms for solving typical large-scale scheduling and resource allocation problems are presented. The capabilities and deficiencies of various alternative problem solving strategies are discussed from the viewpoint of computer system design.

  18. FERMILAB ACCELERATOR R&D PROGRAM TOWARDS INTENSITY FRONTIER ACCELERATORS : STATUS AND PROGRESS

    Energy Technology Data Exchange (ETDEWEB)

    Shiltsev, Vladimir [Fermilab

    2016-11-15

    The 2014 P5 report indicated the accelerator-based neutrino and rare decay physics research as a centrepiece of the US domestic HEP program at Fermilab. Operation, upgrade and development of the accelerators for the near- term and longer-term particle physics program at the Intensity Frontier face formidable challenges. Here we discuss key elements of the accelerator physics and technology R&D program toward future multi-MW proton accelerators and present its status and progress. INTENSITY FRONTIER ACCELERATORS

  19. A theory of behaviour on progressive ratio schedules, with applications in behavioural pharmacology.

    Science.gov (United States)

    Bradshaw, C M; Killeen, P R

    2012-08-01

    Mathematical principles of reinforcement (MPR) provide the theoretical basis for a family of models of schedule-controlled behaviour. A model of fixed-ratio schedule performance that was applied to behaviour on progressive ratio (PR) schedules showed systematic departures from the data. This study aims to derive a new model from MPR that will account for overall and running response rates in the component ratios of PR schedules, and their decline toward 0, the breakpoint. The role of pausing is represented in a real-time model containing four parameters: T (0) and k are the intercept and slope of the linear relation between post-reinforcement pause duration and the prior inter-reinforcer interval; a (specific activation) measures the incentive value of the reinforcer; δ (response time) sets biomechanical limits on response rate. Running rate is predicted to decrease with negative acceleration as ratio size increments, overall rate to increase and then decrease. Differences due to type of progression are explained as hysteresis in the control by reinforcement rates. Re-analysis of extant data focuses on the effects of acute treatment with antipsychotic drugs, lesions of the nucleus accumbens core, and destruction of orexinergic neurones of the lateral hypothalamus. The new model resolves some anomalies evident in earlier analyses, and provides new insights to the results of these interventions. Because they can render biologically relevant parameters, mathematical models can provide greater power in interpreting the effects of interventions on the processes underlying schedule-controlled behaviour than is possible for first-order data such as the breakpoint.

  20. Implementing Expertise-Based Training Methods to Accelerate the Development of Peer Academic Coaches

    Science.gov (United States)

    Blair, Lisa

    2016-01-01

    The field of expertise studies offers several models from which to develop training programs that accelerate the development of novice performers in a variety of domains. This research study implemented two methods of expertise-based training in a course to develop undergraduate peer academic coaches through a ten-week program. An existing…

  1. Accelerating Adverse Outcome Pathway (AOP) development ...

    Science.gov (United States)

    The Adverse Outcome Pathway (AOP) framework is increasingly being adopted as a tool for organizing and summarizing the mechanistic information connecting molecular perturbations by environmental stressors with adverse outcomes relevant for ecological and human health outcomes. However, the conventional process for assembly of these AOPs is time and resource intensive, and has been a rate limiting step for AOP use and development. Therefore computational approaches to accelerate the process need to be developed. We previously developed a method for generating computationally predicted AOPs (cpAOPs) by association mining and integration of data from publicly available databases. In this work, a cpAOP network of ~21,000 associations was established between 105 phenotypes from TG-GATEs rat liver data from different time points (including microarray, pathological effects and clinical chemistry data), 994 REACTOME pathways, 688 High-throughput assays from ToxCast and 194 chemicals. A second network of 128,536 associations was generated by connecting 255 biological target genes from ToxCast to 4,980 diseases from CTD using either HT screening activity from ToxCast for 286 chemicals or CTD gene expression changes in response to 2,330 chemicals. Both networks were separately evaluated through manual extraction of disease-specific cpAOPs and comparison with expert curation of the relevant literature. By employing data integration strategies that involve the weighting of n

  2. Feasibility study on the development of proton accelerator

    Energy Technology Data Exchange (ETDEWEB)

    Chung, Ki Hyung; Bang, Hyung Chan; Cho, Yong Sup [Seoul National University, Seoul (Korea, Republic of); Kim, Young Rak [Church Environment Research Institute, Seoul (Korea, Republic of); Nam Kung, Won; Cho, Moo Hyun [Pohang University of Science and Technology, Pohang (Korea, Republic of); Seo, Tae Suk [Cartolrik University, Seoul (Korea, Republic of); Woo, Hyung Joo [Nature Research Institute, Seoul (Korea, Republic of); Lee, Kyung Soo [Basic Study Research Institute, Seoul (Korea, Republic of); Lee, Hun Joo [Cheju National University, Cheju (Korea, Republic of); Chang, Soon Hong; Cho, Nam Jin [Korea Advanced Institute of Science and Technology, Taejon (Korea, Republic of); Han, Jeon Kun [Sungkyunkwan University, Seoul (Korea, Republic of)

    1996-10-01

    A feasibility on the development of a high energy proton accelerator to be used for R and D in the nuclear field of korea was studied. The proposed one is a proton linac with parameters of about 1 GeV, 20 mA which can supply enough neutrons by the spallation reaction to drive a subcritical reactor. It= is expected to solve the intrinsic problem in the nuclear field such as safety, nuclear waste, proliferation and resource. The study was carried out through a multi-institutional cooperation of universities, institute and industry for a national consensus. 5 refs., 8 tabs., 8 figs. (author)

  3. Target normal sheath acceleration analytical modeling, comparative study and developments

    International Nuclear Information System (INIS)

    Perego, C.; Batani, D.; Zani, A.; Passoni, M.

    2012-01-01

    Ultra-intense laser interaction with solid targets appears to be an extremely promising technique to accelerate ions up to several MeV, producing beams that exhibit interesting properties for many foreseen applications. Nowadays, most of all the published experimental results can be theoretically explained in the framework of the target normal sheath acceleration (TNSA) mechanism proposed by Wilks et al. [Phys. Plasmas 8(2), 542 (2001)]. As an alternative to numerical simulation various analytical or semi-analytical TNSA models have been published in the latest years, each of them trying to provide predictions for some of the ion beam features, given the initial laser and target parameters. However, the problem of developing a reliable model for the TNSA process is still open, which is why the purpose of this work is to enlighten the present situation of TNSA modeling and experimental results, by means of a quantitative comparison between measurements and theoretical predictions of the maximum ion energy. Moreover, in the light of such an analysis, some indications for the future development of the model proposed by Passoni and Lontano [Phys. Plasmas 13(4), 042102 (2006)] are then presented.

  4. Thinking Outside the Block: An Innovative Alternative to 4X4 Block Scheduling.

    Science.gov (United States)

    Frank, Myra

    2002-01-01

    Introduces a 4x1 block scheduling method that was developed as an alternative to 4x4 block scheduling. Schedules Fridays for summer school, test preparation, and enrichment and elective courses. Includes suggestions on how to alleviate drawbacks of the 4x1 block schedule. (YDS)

  5. A European roadmap for developing accelerator driven systems (ADS) for nuclear waste incineration. Executive summary

    International Nuclear Information System (INIS)

    The European Technical Working Group on ADS

    2001-01-01

    In 1998 the Research Ministers of France, Italy and Spain, set up a Ministers' Advisors Group on the use of accelerator driven systems (ADS) for nuclear waste transmutation. This led to the establishing of a technical working group under the chairmanship of Prof. Carlo Rubbia to identify the critical technical issues and to prepare a 'Roadmap' for a demonstration programme to be performed within 12 years. In the following Roadmap, the technical working group (consisting of representatives from Austria, Belgium, Finland, France, Germany, Italy, Portugal, Spain, Sweden and the JRC) has identified the steps necessary to start the construction of an experimental accelerator driven system towards the end of the decade. This is considered as an essential prerequisite to assess the safe and efficient behaviour of such systems for a large-scale deployment for transmutation purposes in the first half of this century. The development and deployment of accelerator driven systems requires three steps: a comprehensive mid- and long-term R and D program, to develop the single elements and components of the system. This includes development of new fuels and fuel cycle systems; planning, design, construction and operation of an Experimental Accelerator Driven System for the demonstration of the concept; planning, design, construction and operation of a large size prototype accelerator driven systems with subsequent large-scale deployment. Following a first phase of R and D focused on the understanding of the basic principles of ADS (already partly underway), the programmes should be streamlined and focused on a practical demonstration of the key issues. These demonstrations should cover high intensity proton accelerators (beam currents in the range 1-20 mA), spallation targets of high power (of power in excess of 1 megawatt), and their effective coupling with a sub-critical core. Cost estimates are taken into account as well as the ADS activities in Japan and USA

  6. Development of superconducting crossbar-H-mode cavities for proton and ion accelerators

    Directory of Open Access Journals (Sweden)

    F. Dziuba

    2010-04-01

    Full Text Available The crossbar-H-mode (CH structure is the first superconducting multicell drift tube cavity for the low and medium energy range operated in the H_{21} mode. Because of the large energy gain per cavity, which leads to high real estate gradients, it is an excellent candidate for the efficient acceleration in high power proton and ion accelerators with fixed velocity profile. A prototype cavity has been developed and tested successfully with a gradient of 7  MV/m. A few new superconducting CH cavities with improved geometries for different high power applications are under development at present. One cavity (f=325  MHz, β=0.16, seven cells is currently under construction and studied with respect to a possible upgrade option for the GSI UNILAC. Another cavity (f=217  MHz, β=0.059, 15 cells is designed for a cw operated energy variable heavy ion linac application. Furthermore, the EUROTRANS project (European research program for the transmutation of high level nuclear waste in an accelerator driven system, 600 MeV protons, 352 MHz is one of many possible applications for this kind of superconducting rf cavity. In this context a layout of the 17 MeV EUROTRANS injector containing four superconducting CH cavities was proposed by the Institute for Applied Physics (IAP Frankfurt. The status of the cavity development related to the EUROTRANS injector is presented.

  7. Industrial Application of Accelerators

    CERN Multimedia

    CERN. Geneva

    2017-01-01

    At CERN, we are very familiar with large, high energy particle accelerators. However, in the world outside CERN, there are more than 35000 accelerators which are used for applications ranging from treating cancer, through making better electronics to removing harmful micro-organisms from food and water. These are responsible for around $0.5T of commerce each year. Almost all are less than 20 MeV and most use accelerator types that are somewhat different from what is at CERN. These lectures will describe some of the most common applications, some of the newer applications in development and the accelerator technology used for them. It will also show examples of where technology developed for particle physics is now being studied for these applications. Rob Edgecock is a Professor of Accelerator Science, with a particular interest in the medical applications of accelerators. He works jointly for the STFC Rutherford Appleton Laboratory and the International Institute for Accelerator Applications at the Univer...

  8. Industrial Application of Accelerators

    CERN Multimedia

    CERN. Geneva

    2017-01-01

    At CERN, we are very familiar with large, high energy particle accelerators. However, in the world outside CERN, there are more than 35000 accelerators which are used for applications ranging from treating cancer, through making better electronics to removing harmful micro-organisms from food and water. These are responsible for around $0.5T of commerce each year. Almost all are less than 20 MeV and most use accelerator types that are somewhat different from what is at CERN. These lectures will describe some of the most common applications, some of the newer applications in development and the accelerator technology used for them. It will also show examples of where technology developed for particle physics is now being studied for these applications. Rob Edgecock is a Professor of Accelerator Science, with a particular interest in the medical applications of accelerators. He works jointly for the STFC Rutherford Appleton Laboratory and the International Institute for Accelerator Applications at the Uni...

  9. How should periods without social interaction be scheduled? Children's preference for practical schedules of positive reinforcement.

    Science.gov (United States)

    Luczynski, Kevin C; Hanley, Gregory P

    2014-01-01

    Several studies have shown that children prefer contingent reinforcement (CR) rather than yoked noncontingent reinforcement (NCR) when continuous reinforcement is programmed in the CR schedule. Preference has not, however, been evaluated for practical schedules that involve CR. In Study 1, we assessed 5 children's preference for obtaining social interaction via a multiple schedule (periods of fixed-ratio 1 reinforcement alternating with periods of extinction), a briefly signaled delayed reinforcement schedule, and an NCR schedule. The multiple schedule promoted the most efficient level of responding. In general, children chose to experience the multiple schedule and avoided the delay and NCR schedules, indicating that they preferred multiple schedules as the means to arrange practical schedules of social interaction. In Study 2, we evaluated potential controlling variables that influenced 1 child's preference for the multiple schedule and found that the strong positive contingency was the primary variable. © Society for the Experimental Analysis of Behavior.

  10. Second International Conference on Accelerating Biopharmaceutical Development: March 9-12, 2009, Coronado, CA, USA.

    Science.gov (United States)

    Reichert, Janice M; Jacob, Nitya M; Amanullah, Ashraf

    2009-01-01

    The Second International Conference on Accelerating Biopharmaceutical Development was held in Coronado, California. The meeting was organized by the Society for Biological Engineering (SBE) and the American Institute of Chemical Engineers (AIChE); SBE is a technological community of the AIChE. Bob Adamson (Wyeth) and Chuck Goochee (Centocor) were co-chairs of the event, which had the theme "Delivering cost-effective, robust processes and methods quickly and efficiently." The first day focused on emerging disruptive technologies and cutting-edge analytical techniques. Day two featured presentations on accelerated cell culture process development, critical quality attributes, specifications and comparability, and high throughput protein formulation development. The final day was dedicated to discussion of technology options and new analysis methods provided by emerging disruptive technologies; functional interaction, integration and synergy in platform development; and rapid and economic purification process development.

  11. Late course accelerated fractionation in radiotherapy of esophageal carcinoma

    International Nuclear Information System (INIS)

    Shi, X.-H.; Yao, W.; Liu, T.

    1999-01-01

    Purpose: To evaluate the efficacy of adding accelerated fractionation after completing two thirds of routine fractionated radiotherapy in esophageal carcinoma.Methods and materials: From April 1988 to April 1990, 85 patients with histologically confirmed carcinoma of the esophagus were randomized into two groups. (1) The conventional fractionation (CF) group, received 1.8 Gy per day five times a week to a total dose of 68.4 Gy in 7-8 weeks, and (2) the late course accelerated hyperfractionated (LCAF) group which received the same schedule as the CF group during the first two thirds of the course of radiotherapy to a dose of 41.4 Gy/23 fx/4 to 5 weeks. This was then followed by accelerated hyperfractionation using reduced fields. In the LCAF portion of the radiotherapeutic course, the irradiation schedule was changed to 1.5 Gy twice a day, with an interval of 4 h between fractions, to a dose of 27 Gy/18 fx. Thus the total dose was also 68.4 Gy, the same as the CF group, but the course of radiotherapy was shorter, being only 6.4 weeks. The same Cobalt 60 teletherapy unit was used to treat all the cases.Results: The 5 year actuarial survival and disease-free survival rates in the LCAF group were 34% and 42%, as compared to 15% and 15% respectively in the CF group, all statistically significant. Better local control was seen in the LCAF group than in the CF group, the 5 year control rates being 55% versus 21% (P=0.003). The acute reactions were increased but acceptable in the LCAF patients, the radiation treatments could be completed without any breaks. The late reactions as observed after 5 years were not increased in comparison with the CF patients.Conclusions: The results from this study show that the late course accelerated hyperfractionated radiotherapy regime can improve results in esophageal carcinoma, with acceptable acute reactions as compared to conventional radiotherapy. (Copyright (c) 1999 Elsevier Science B.V., Amsterdam. All rights reserved.)

  12. The comparison of predictive scheduling algorithms for different sizes of job shop scheduling problems

    Science.gov (United States)

    Paprocka, I.; Kempa, W. M.; Grabowik, C.; Kalinowski, K.; Krenczyk, D.

    2016-08-01

    In the paper a survey of predictive and reactive scheduling methods is done in order to evaluate how the ability of prediction of reliability characteristics influences over robustness criteria. The most important reliability characteristics are: Mean Time to Failure, Mean Time of Repair. Survey analysis is done for a job shop scheduling problem. The paper answers the question: what method generates robust schedules in the case of a bottleneck failure occurrence before, at the beginning of planned maintenance actions or after planned maintenance actions? Efficiency of predictive schedules is evaluated using criteria: makespan, total tardiness, flow time, idle time. Efficiency of reactive schedules is evaluated using: solution robustness criterion and quality robustness criterion. This paper is the continuation of the research conducted in the paper [1], where the survey of predictive and reactive scheduling methods is done only for small size scheduling problems.

  13. The Risk of Developing Diabetes in Association With Long Working Hours Differs by Shift Work Schedules

    Directory of Open Access Journals (Sweden)

    Akira Bannai

    2016-09-01

    Full Text Available Background: The impact of long working hours on diabetes is controversial; however, shift work is known to increase the risk of diabetes. This study aimed to investigate the association between long working hours and diabetes among civil servants in Japan separately by shift work schedules. Methods: A prospective cohort study was conducted from April 2003 to March 2009. A total of 3195 men aged ≥35 years who underwent an annual health checkup at baseline were analyzed by shift work schedules (2371 nonshift workers and 824 shift workers. Self-reported working hours were categorized as 35–44 and ≥45 hours per week. The incidence of diabetes was confirmed by fasting plasma glucose concentration ≥126 mg/dL and/or selfreported medical diagnosis of diabetes at the annual checkup. A Cox proportional model was used to calculate hazard ratios (HRs and 95% confidence intervals (CIs for developing diabetes associated with long working hours. Results: The median follow-up period of non-shift and shift workers was 5.0 and 4.9 years, respectively. During this period, 138 non-shift workers and 46 shift workers developed diabetes. A decreased HR was found among nonshift workers working ≥45 hours per week (HR 0.84; 95% CI, 0.57–1.24; however, shift workers working ≥45 hours per week had a significantly increased risk of diabetes (HR 2.43; 95% CI, 1.21–5.10 compared with those working 35–44 hours per week. An analysis restricted to non-clerical workers also showed similar results. Conclusions: The risk of diabetes associated with long working hours differed by shift work schedules.

  14. The Risk of Developing Diabetes in Association With Long Working Hours Differs by Shift Work Schedules.

    Science.gov (United States)

    Bannai, Akira; Yoshioka, Eiji; Saijo, Yasuaki; Sasaki, Sachiko; Kishi, Reiko; Tamakoshi, Akiko

    2016-09-05

    The impact of long working hours on diabetes is controversial; however, shift work is known to increase the risk of diabetes. This study aimed to investigate the association between long working hours and diabetes among civil servants in Japan separately by shift work schedules. A prospective cohort study was conducted from April 2003 to March 2009. A total of 3195 men aged ≥35 years who underwent an annual health checkup at baseline were analyzed by shift work schedules (2371 non-shift workers and 824 shift workers). Self-reported working hours were categorized as 35-44 and ≥45 hours per week. The incidence of diabetes was confirmed by fasting plasma glucose concentration ≥126 mg/dL and/or self-reported medical diagnosis of diabetes at the annual checkup. A Cox proportional model was used to calculate hazard ratios (HRs) and 95% confidence intervals (CIs) for developing diabetes associated with long working hours. The median follow-up period of non-shift and shift workers was 5.0 and 4.9 years, respectively. During this period, 138 non-shift workers and 46 shift workers developed diabetes. A decreased HR was found among non-shift workers working ≥45 hours per week (HR 0.84; 95% CI, 0.57-1.24); however, shift workers working ≥45 hours per week had a significantly increased risk of diabetes (HR 2.43; 95% CI, 1.21-5.10) compared with those working 35-44 hours per week. An analysis restricted to non-clerical workers also showed similar results. The risk of diabetes associated with long working hours differed by shift work schedules.

  15. Plasma opening switch development for the Particle Beam Fusion Accelerator II (PBFA II)

    International Nuclear Information System (INIS)

    Stinnett, R.W.; McDaniel, D.H.; Rochau, G.E.

    1987-01-01

    The authors conducted plasma opening switch (POS) experiments on Sandia National Laboratories' new Particle Beam Fusin Accelerator II (PBFA II) (12 MV, 100 TW, 50 ns), on the Supermite accelerator (2 MV, 2 TW, 50 ns) and on the Naval Research Laboratory's Gamble II accelerator (1.8 MV, 1.6 TW, 70 ns). The POS systems on the PBFA II and Supermite accelerators use a newly developed flashboard plasma source to provide the plasma necessary to conduct the large (> 1 MA) currents produced byu these accelerators. In the Supermite experiments, the plasma opening switch conducted currents up to 1 MA before opening in less than 10 ns into an electron beam load. These experiments achieved significant voltage gain relative to the voltage across a matched load. In experiments on Gamble II, power gains of up to 1.7 were achieved using a POS in a strongly coaxial geometry (r/sub outer//r/sub inner/ = 2) with a large magnetic field at the cathode. The POS system on PBFA II is unique because of its size and voltage. This POS system is designed to conduct over 6 MA before opening. In present experiments it has conducted currents of 4-5 MA for over 50 ns

  16. Accelerators of future generation

    International Nuclear Information System (INIS)

    Kolomenskij, A.A.

    1983-01-01

    A brief review of the prospects of development of various of types accelerator over next 10 to 15 years is given. The following directions are considered: superhign energy proton accelerators and storage rings, electron-positron colliding beams, heavy ion accelerators, medium energy, high-current proton accelerators superhigh power particle beams (electrons light- and heavy ions) for inertial fusion

  17. Plasma-based accelerator structures

    International Nuclear Information System (INIS)

    Schroeder, Carl B.

    1999-01-01

    Plasma-based accelerators have the ability to sustain extremely large accelerating gradients, with possible high-energy physics applications. This dissertation further develops the theory of plasma-based accelerators by addressing three topics: the performance of a hollow plasma channel as an accelerating structure, the generation of ultrashort electron bunches, and the propagation of laser pulses is underdense plasmas

  18. Development of an accelerating piston implosion-driven launcher

    International Nuclear Information System (INIS)

    Huneault, J; Loiseau, J; Higgins, A J

    2014-01-01

    The ability to soft-launch projectiles to velocities exceeding 10 km/s is of interest for a number of scientific fields, including orbital debris impact testing and equation of state research. Current soft-launch technologies have reached a performance plateau below this operating range. In the implosion-driven launcher (ILD) concept, explosives are used to dynamically compress a light driver gas to significantly higher pressures and temperatures than the propellant of conventional light-gas guns. The propellant of the IDL is compressed through the linear implosion of a pressurized tube. The imploding tube behaves like a piston which travels into the light gas at the explosive detonation velocity, thus forming an increasingly long column of shock-compressed gas which can be used to propel a projectile. The McGill designed IDL has demonstrated the ability to launch a 0.1-g projectile to 9.1 km/s. This work will focus on the implementation of a novel launch cycle in which the explosively driven piston is accelerated in order to gradually increase driver gas compression, thus maintaining a relatively constant projectile driving pressure. The theoretical potential of the concept as well as the experimental development of an accelerating piston driver will be examined.

  19. Development of new low level radioactive waste disposal sites: A progress report

    International Nuclear Information System (INIS)

    Anderson, Robert T.; Antonucci, George J.; Ryan, Michael T.

    1992-01-01

    The status of the development of three new low level radioactive waste disposal facilities for the Central Midwest (Illinois), Southeastern (North Carolina) and Appalachian (Pennsylvania) compacts is presented. These three sites will dispose of about 50-65 percent of the commercial low-level waste (LLW) generated in the U.S. annually. Chem-Nuclear, as developer and proposed operator of all three sites has used a common approach to site development. This approach has been based on their twenty-plus years of operating experience and a standard technical approach. The technology employed is an above-grade, multiple engineered barrier design. The paper also contrasts actual progress at each site with a generalized project schedule. Areas of schedule delays are noted along with the steps being taken to accelerate schedule. Finally, we note that continued progress and timely start-up of operations of these new sites is critical on a national basis. This is due to the possibility of near-term closure of the existing LLW disposal sites. (author)

  20. MYRRHA: a multipurpose accelerator driven system for research and development

    International Nuclear Information System (INIS)

    Benoit, Ph.; Ait Abderrahim, H.; Kupschus, P.; Malambu, E.; Tichelen, K. van; Arien, B.; Vermeersch, F.; Jongen, Y.; Vandeplassche, D.; Ternier, S.

    2001-01-01

    SCK-CEN, the Belgian Nuclear Research Centre, and IBA s.a., Ion Beam Application, a world leader in accelerator technology, want to fulfil a prominent role in the Accelerator Driven Systems field and are designing an ADS prototype, the MYRRHA Project, and conducting an associated R and D programme. The partners are foreseeing MYRRHA as a first step towards the European ADS-Demo facility. The project focuses primarily on ADS related research, i.e. structural materials and nuclear fuel research, liquid metals and associated aspects, sub-critical reactor physics and subsequently on applications such as waste transmutation, radioisotope production and safety research on sub-critical systems. In this respect, the MYRRHA system should become a new major research infrastructure for the European partners presently involved in the ADS Demo development, supporting and enabling the international R and D programs. Ion Beam Applications, the Belgium world leader in particle accelerators, had joined the MYRRHA Project to perform the accelerator development. Currently the study and preliminary conceptual design of the MYRRHA system is going on and an intensive R and D programme is conducted to assess the most risky points of the present design. This study will define the final choice of the characteristics of the facility depending on the selected fields of application to be achieved. The MYRRHA concept, as it is today, is based on the coupling of an upgraded commercial proton accelerator with a spallation target surrounded by a subcritical neutron-multiplying medium. Its design is determined by the versatility m applications that should be made possible. Further technical and/or strategic developments of the project might change the concept. A cyclotron, based on positive ion acceleration technology brings the protons up to an energy level of 350 MeV. The nominal current is 5 mA of protons. The spallation target system consists in a circuit with, at the upper part, a free

  1. Scheduling with Time Lags

    NARCIS (Netherlands)

    X. Zhang (Xiandong)

    2010-01-01

    textabstractScheduling is essential when activities need to be allocated to scarce resources over time. Motivated by the problem of scheduling barges along container terminals in the Port of Rotterdam, this thesis designs and analyzes algorithms for various on-line and off-line scheduling problems

  2. CERN-LHC accelerator superconducting magnet. Development and international cooperation

    International Nuclear Information System (INIS)

    Yamamoto, Akira; Nakamoto, Tatsushi; Sasaki, Ken-ichi

    2009-01-01

    CERN-LHC accelerator superconducting magnets and a cooperative work for interaction region quadrupole magnets are introduced. The accelerator commissioning and the incident happened during the commissioning in 2008 is also briefly discussed. (author)

  3. Scheduling rules to achieve lead-time targets in outpatient appointment systems

    OpenAIRE

    Sivakumar, Appa Iyer; Nguyen, Thu Ba Thi; Graves, Stephen C

    2015-01-01

    This paper considers how to schedule appointments for outpatients, for a clinic that is subject to appointment lead-time targets for both new and returning patients. We develop heuristic rules, which are the exact and relaxed appointment scheduling rules, to schedule each new patient appointment (only) in light of uncertainty about future arrivals. The scheduling rules entail two decisions. First, the rules need to determine whether or not a patient's request can be accepted; then, if the req...

  4. DEVELOPMENT OF A LOW COST CAMERA FOR AGING ACCELERATED POLYMERS

    Directory of Open Access Journals (Sweden)

    Carlos Henrique Duarte Felisbino

    2018-03-01

    Full Text Available The objective of this paper is to describe the design, construction and testing of a low cost chamber for accelerated aging of polymers that meets a low and high ultraviolet radiation cycle on the test specimens in accordance with ASTM G154. The methodology was based on the survey of the standards related to the tests of accelerated aging of polymers and of the existing equipment, providing the subsidies for the development of the project, which was validated by the construction and evaluation of its performance. The camera control is performed by an Arduino-based electronic system and uses commercially available components that meet project specifications. The equipment met the requirements for both the specifications and the low cost and will integrate the laboratories of the University of Mogi das Cruzes (UMC, Villa-Lobos campus, to carry out tests on polymer materials.

  5. Schedule Analytics

    Science.gov (United States)

    2016-04-30

    Warfare, Naval Sea Systems Command Acquisition Cycle Time : Defining the Problem David Tate, Institute for Defense Analyses Schedule Analytics Jennifer...research was comprised of the following high- level steps :  Identify and review primary data sources 1...research. However, detailed reviews of the OMB IT Dashboard data revealed that schedule data is highly aggregated. Program start date and program end date

  6. Intelligent scheduling of execution for customized physical fitness and healthcare system.

    Science.gov (United States)

    Huang, Chung-Chi; Liu, Hsiao-Man; Huang, Chung-Lin

    2015-01-01

    Physical fitness and health of white collar business person is getting worse and worse in recent years. Therefore, it is necessary to develop a system which can enhance physical fitness and health for people. Although the exercise prescription can be generated after diagnosing for customized physical fitness and healthcare. It is hard to meet individual execution needs for general scheduling of physical fitness and healthcare system. So the main purpose of this research is to develop an intelligent scheduling of execution for customized physical fitness and healthcare system. The results of diagnosis and prescription for customized physical fitness and healthcare system will be generated by fuzzy logic Inference. Then the results of diagnosis and prescription for customized physical fitness and healthcare system will be scheduled and executed by intelligent computing. The scheduling of execution is generated by using genetic algorithm method. It will improve traditional scheduling of exercise prescription for physical fitness and healthcare. Finally, we will demonstrate the advantages of the intelligent scheduling of execution for customized physical fitness and healthcare system.

  7. Probing electron acceleration and x-ray emission in laser-plasma accelerators

    International Nuclear Information System (INIS)

    Thaury, C.; Ta Phuoc, K.; Corde, S.; Brijesh, P.; Lambert, G.; Malka, V.; Mangles, S. P. D.; Bloom, M. S.; Kneip, S.

    2013-01-01

    While laser-plasma accelerators have demonstrated a strong potential in the acceleration of electrons up to giga-electronvolt energies, few experimental tools for studying the acceleration physics have been developed. In this paper, we demonstrate a method for probing the acceleration process. A second laser beam, propagating perpendicular to the main beam, is focused on the gas jet few nanosecond before the main beam creates the accelerating plasma wave. This second beam is intense enough to ionize the gas and form a density depletion, which will locally inhibit the acceleration. The position of the density depletion is scanned along the interaction length to probe the electron injection and acceleration, and the betatron X-ray emission. To illustrate the potential of the method, the variation of the injection position with the plasma density is studied

  8. The Application of Artificial Intelligence to Astronomical Scheduling Problems

    Science.gov (United States)

    Johnston, Mark D.

    1993-01-01

    As artificial intelligence (AI) technology has moved from the research laboratory into more and more widespread use, one of the leading applications in astronomy has been to high-profile observation scheduling. The Spike scheduling system was developed by the Space Telescope Science Institute (STScI) for the purpose of long-range scheduling of Hubble Space Telescope (HST). Spike has been in daily operational use at STScI since well before HST launch in April 1990. The system has also been adapted to schedule other missions: one of these missions (EUVE) is currently operational, while another (ASTRO-D) will be launched in February 1993. Some other future space astronomy missions (XTE, SWAS, and AXAF) are making tentative plans to use Spike. Spike has proven to be a powerful and flexible scheduling framework with applicability to a wide variety of problems.

  9. RingSys-Scheduler User`s manual. Information terminal for town monitoring; Brukermanual for RingSys-Scheduler. Informasjonsterminal for byovervaaking

    Energy Technology Data Exchange (ETDEWEB)

    Marsteen, L.

    1996-02-01

    This report is a User`s manual. It describes RingSys Scheduler, a computer system for continuous display of time series, public information and static pictures. The computer is connected to a host machine via modem and time series, and public information are automatically updated once an hour. RingSys-Scheduler is PC based. It is developed using Excel`s macro language as well as the asynchronous communication program Dynacomm`s script language. 12 figs.

  10. Staff Scheduling within the Retail Business in Denmark

    DEFF Research Database (Denmark)

    Leedgaard, Jesper; Mortensen, Kim H.; Larsen, Allan

    2002-01-01

    Staff Scheduling within the retail business deals with the assignment of employees such as shop assistants to work tasks so that the right number of employees are available at any given times and the total staff costs are minimized. In this paper the retail staff scheduling problem is formulated...... as a Mixed Integer Problem. The retail staff scheduling problem is solved using the metaheuristic {\\$\\backslash\\$it Simulated Annealing}. The heuristic is implemented by modifying the original MIP model. Some of the constraints defined in the MIP are relaxed, entered into the objective function and weighted...... according to their relative importance. The problem is then formulated as minimizing the overall constraint violation. A thorough parameter test has been applied to the developed heuristics. The developed system has successfully been implemented in a number of shops and stores in Denmark....

  11. 2012 Gordon Research Conference on Rock Deformation - Formal Schedule and Speaker/Poster Program

    Energy Technology Data Exchange (ETDEWEB)

    Kelemen, Peter [Columbia Univ., New York, NY (United States)

    2012-08-24

    The Gordon Research Conference on ROCK DEFORMATION was held at Proctor Academy Andover, New Hampshire, August 19-24, 2012. The Conference was well-attended with 124 participants (attendees list attached). The attendees represented the spectrum of endeavor in this field coming from academia, industry, and government laboratories, both U.S. and foreign scientists, senior researchers, young investigators, and students. Of the 124 attendees, 66 voluntarily responded to a general inquiry regarding ethnicity which appears on our registration forms. Of the 66 respondents, 8% were Minorities – 2% Hispanic, 6% Asian and 0% African American. Approximately 27% of the participants at the 2012 meeting were women. In designing the formal speakers program, emphasis was placed on current unpublished research and discussion of the future target areas in this field. There was a conscious effort to stimulate lively discussion about the key issues in the field today. Time for formal presentations was limited in the interest of group discussions. In order that more scientists could communicate their most recent results, poster presentation time was scheduled. Attached is a copy of the formal schedule and speaker program and the poster program. In addition to these formal interactions, "free time" was scheduled to allow informal discussions. Such discussions are fostering new collaborations and joint efforts in the field. Feedback processes are vitally important in controlling the rates and mechanisms of rock deformation. Positive feedbacks lead to accelerating rates, and commonly to spatial focusing. Localization and acceleration of creep is often associated with stress and/or strain rate dependent grain size reduction, frictional heating, or viscous shear heating. The presence of melt may help to localize and accelerate deformation, and in turn deformation may help to localize melt transport. Volume changes during retrograde metamorphic reactions may, under some circumstances, lead

  12. An accelerated stress testing program for determining the reliability sensitivity of silicon solar cells to encapsulation and metallization systems

    Science.gov (United States)

    Lathrop, J. W.; Davis, C. W.; Royal, E.

    1982-01-01

    The use of accelerated testing methods in a program to determine the reliability attributes of terrestrial silicon solar cells is discussed. Different failure modes are to be expected when cells with and without encapsulation are subjected to accelerated testing and separate test schedules for each are described. Unencapsulated test cells having slight variations in metallization are used to illustrate how accelerated testing can highlight different diffusion related failure mechanisms. The usefulness of accelerated testing when applied to encapsulated cells is illustrated by results showing that moisture related degradation may be many times worse with some forms of encapsulation than with no encapsulation at all.

  13. Preemptive scheduling with rejection

    NARCIS (Netherlands)

    Hoogeveen, H.; Skutella, M.; Woeginger, Gerhard

    2003-01-01

    We consider the problem of preemptively scheduling a set of n jobs on m (identical, uniformly related, or unrelated) parallel machines. The scheduler may reject a subset of the jobs and thereby incur job-dependent penalties for each rejected job, and he must construct a schedule for the remaining

  14. Preemptive scheduling with rejection

    NARCIS (Netherlands)

    Hoogeveen, J.A.; Skutella, M.; Woeginger, G.J.; Paterson, M.

    2000-01-01

    We consider the problem of preemptively scheduling a set of n jobs on m (identical, uniformly related, or unrelated) parallel machines. The scheduler may reject a subset of the jobs and thereby incur job-dependent penalties for each rejected job, and he must construct a schedule for the remaining

  15. Development of 350 MHz/1000 Watt intermediate power amplifier for 400 keV RFQ accelerator

    International Nuclear Information System (INIS)

    Pande, M.M.; Patel, N.R.; Shinde, K.R.; Rao, M.K.V.; Handu, V.K.

    2005-01-01

    Two numbers of high power RF systems, each delivering around 35 to 40 kW of power at 350 MHz are being developed in BARC. These High Power Amplifiers (HPA) cater to the total need of 70 kW of RF power required by the 400 keV (Deuterium) RFQ accelerator. This RFQ will replace the existing 400 keV DC accelerator of 14 MeV Neutron Generator. The RFQ will accelerate a deuterium beam from 50 keV to 400 keV to impinge upon a tritium target inside a sub critical assembly. Each of these 35 / 40 KW HPA requires a drive power of around 1000 / 1500 Watt respectively. Hence a intermediate power amplifier (IPA) bas been designed to deliver the power of 1000 Watt at the rate of 350 MHz. The paper describes the development of this amplifier

  16. Examination of the Safety of Pediatric Vaccine Schedules in a Non-Human Primate Model: Assessments of Neurodevelopment, Learning, and Social Behavior

    Science.gov (United States)

    Curtis, Britni; Liberato, Noelle; Rulien, Megan; Morrisroe, Kelly; Kenney, Caroline; Yutuc, Vernon; Ferrier, Clayton; Marti, C. Nathan; Mandell, Dorothy; Burbacher, Thomas M.; Sackett, Gene P.

    2015-01-01

    Background In the 1990s, the mercury-based preservative thimerosal was used in most pediatric vaccines. Although there are currently only two thimerosal-containing vaccines (TCVs) recommended for pediatric use, parental perceptions that vaccines pose safety concerns are affecting vaccination rates, particularly in light of the much expanded and more complex schedule in place today. Objectives The objective of this study was to examine the safety of pediatric vaccine schedules in a non-human primate model. Methods We administered vaccines to six groups of infant male rhesus macaques (n = 12–16/group) using a standardized thimerosal dose where appropriate. Study groups included the recommended 1990s Pediatric vaccine schedule, an accelerated 1990s Primate schedule with or without the measles–mumps–rubella (MMR) vaccine, the MMR vaccine only, and the expanded 2008 schedule. We administered saline injections to age-matched control animals (n = 16). Infant development was assessed from birth to 12 months of age by examining the acquisition of neonatal reflexes, the development of object concept permanence (OCP), computerized tests of discrimination learning, and infant social behavior. Data were analyzed using analysis of variance, multilevel modeling, and survival analyses, where appropriate. Results We observed no group differences in the acquisition of OCP. During discrimination learning, animals receiving TCVs had improved performance on reversal testing, although some of these same animals showed poorer performance in subsequent learning-set testing. Analysis of social and nonsocial behaviors identified few instances of negative behaviors across the entire infancy period. Although some group differences in specific behaviors were reported at 2 months of age, by 12 months all infants, irrespective of vaccination status, had developed the typical repertoire of macaque behaviors. Conclusions This comprehensive 5-year case–control study, which closely examined

  17. Development of Milestone Schedules for Selected Logistics Support Directorate Programs. Appendix A. Part 2. Task Summaries.

    Science.gov (United States)

    1987-09-15

    LOGISTIC SUPPORT (ILS) COST ESTIMATE SCODE NUMBER: NONE -ESPONSIBILITY: ROY & ILS ’,!,RATION: 22.00 WORK DAYS A-221 * .9 ..- 9 * PAGE: .LSMTEST SCHEDULE: CE...0/ TIPO SCHEDULE: DV CONDUCT A PERFORMANCE DEMONSTRATION PRIOR TO TECHNICAL TEST CODE NUMBER: NONE (TT) I AND USER TEST (UT) I. RESPONSIBILITY...RESPONSIBILITY: BELVOIR LAB DURATION: 20.00 WORK DAYS ENG DE I SCHEDULE: DV ENGINEERING DESIGN INITIATED. CODE NUMBER: NONE RESPONSIBILITY: BELVOIR LAB

  18. Large tandem accelerators

    International Nuclear Information System (INIS)

    Jones, C.M.

    1976-01-01

    The increasing importance of energetic heavy ion beams in the study of atomic physics, nuclear physics, and materials science has partially or wholly motivated the construction of a new generation of tandem accelerators designed to operate at maximum terminal potentials in the range 14 to 30 MV. In addition, a number of older tandem accelerators are now being significantly upgraded to improve their heavy ion performance. Both of these developments have reemphasized the importance of negative heavy ion sources. The new large tandem accelerators are described, and the requirements placed on negative heavy ion source technology by these and other tandem accelerators used for the acceleration of heavy ions are discussed. First, a brief description is given of the large tandem accelerators which have been completed recently, are under construction, or are funded for construction, second, the motivation for construction of these accelerators is discussed, and last, criteria for negative ion sources for use with these accelerators are presented

  19. Dynamic Appliances Scheduling in Collaborative MicroGrids System

    Science.gov (United States)

    Bilil, Hasnae; Aniba, Ghassane; Gharavi, Hamid

    2017-01-01

    In this paper a new approach which is based on a collaborative system of MicroGrids (MG’s), is proposed to enable household appliance scheduling. To achieve this, appliances are categorized into flexible and non-flexible Deferrable Loads (DL’s), according to their electrical components. We propose a dynamic scheduling algorithm where users can systematically manage the operation of their electric appliances. The main challenge is to develop a flattening function calculus (reshaping) for both flexible and non-flexible DL’s. In addition, implementation of the proposed algorithm would require dynamically analyzing two successive multi-objective optimization (MOO) problems. The first targets the activation schedule of non-flexible DL’s and the second deals with the power profiles of flexible DL’s. The MOO problems are resolved by using a fast and elitist multi-objective genetic algorithm (NSGA-II). Finally, in order to show the efficiency of the proposed approach, a case study of a collaborative system that consists of 40 MG’s registered in the load curve for the flattening program has been developed. The results verify that the load curve can indeed become very flat by applying the proposed scheduling approach. PMID:28824226

  20. Developments on the SCADA of CERN Accelerators Vacuum

    CERN Document Server

    Antoniotti, F; Boccioli, M; Gomes, P; Pereira, H; Kopylov, L; Mikheev, M; Merker, S

    2014-01-01

    During the first 3 years of LHC operation, the priority for the SCADA (Supervisory Control And Data Acquisition) of vacuum controls was to attend to user requests, and to improve its ergonomics and efficiency: access & presentation of information simplified and normalized; coherent functionalities & menus across all accelerators; automatic scripts instead of fastidious manual actions; enhanced tools for data analysis and for maintenance interventions. Several decades of cumulative developments, based on heterogeneous technologies and architectures, have been asking for a homogenization effort. The first LHC Long Shutdown (LS1) provides the opportunity to further standardize the vacuum controls systems [1], around Siemens-S7 PLCs (Programmable Logic Controllers) and PVSS SCADA. Meanwhile, exchanges with other Groups at CERN and outside Institutes have been promoted: to follow the global update policy for software libraries; to discuss philosophies and development details; and to accomplish common pro...

  1. The Development of Plant Maintenance Scheduling Via lnventory System for Sustainable Plant Operation

    Directory of Open Access Journals (Sweden)

    Masripan Roslizan

    2016-01-01

    Full Text Available Industrial sector becomes the main concern for developing country. By the time, it was increased rapidly. However, there are many problems observed such as maintenance scheduling, stock inventory and supply chain. Therefore, this research develops new inventory system to develop sustainable plant operation with a high capability to plant operation especially to stock inventory of machine component. In also required green application with minimised used on paper. This system is developed using Radio Frequency Identification (RFID for inventory control which integrated with web-based system. This system consists of several modules such as station module, item module and item request module and report of critical stock in the store. This system can be controlled from a hand-phone with internet connection or automatic alert such as Short Massage Send (SMS and email. The developed system is very effective in monitoring the stock material through the barcode, supply chain and worker performance as well as to reduce the lead time for maintenance activities of the company through sustainable plant operation.

  2. Recent progress in particle accelerators

    International Nuclear Information System (INIS)

    Cole, F.T.; Mills, F.E.

    1988-01-01

    Many accelerators have also been built for medical radiography and therapy. Electron accelerators for this application are available commercially, using the electrons directly or bremsstrahlung photons. Neutrons produced by accelerator beams have also been used for therapy with considerable success, and several proton accelerators built for physics research have been adapted for direct therapy with protons. The first proton accelerator specifically for therapy is now being built. Separate from what might be called conventional accelerator technology, an entirely new field utilizing very highly pulsed power has been developed, and beams of short pulses of thousands or millions of amperes peak current in the MeV energy range are now available. These beams have important applications in high-energy particle acceleration, controlled fusion, industrial treatment of materials, and possibly in food preservation. All of these accelerators make use of external fields of acceleration. There is also vigorous research into new methods of acceleration, in many schemes making use of the intense accelerating fields, generated by laser beams or by plasma states of matter. This research has not as yet made traditional kinds of accelerators outmoded, but many workers hope that early in the next century there will be practical new acceleration methods making use of these very high fields. These developments are discussed in detail

  3. Developments on the RF system for the Fusion Materials Irradiation Test Facility accelerator

    International Nuclear Information System (INIS)

    Fazio, M.V.; Johnson, H.P.; Riggin, D.M.

    1979-01-01

    The rf system for the Fusion Materials Irradiation Test (FMIT) accelerator is currently in the design phase at the Los Alamos Scientific Laboratory (LASL). The 35-MeV, 100-mA deuteron beam will require approximately 6 MW of rf power at 80 MHz. The EIMAC 8973 power tetrode, capable of a 600-kW cw output, has been chosen as the final amplifier tube for each of 15 amplifier chains. The final power stage of each chain is designed to perform as a linear Class B amplifier. Each low-power rf system (less than or equal to 100W) is to be phase, amplitude, and frequency controlled to provide a drive signal for each high-power amplifier. Beam dynamics for particle acceleration and for minimal beam spill require each rf amplifier output to be phase controlled to +-1 0 . The amplitude of the accelerating field must be held to +-1%. A varactor-tuned electronic phase shifter and a linear phase detector are under development for use in this system. To complement hardware development, analog computer simulations are being performed to optimize the closed-loop control characteristics of the system

  4. Integrating Preventive Maintenance Scheduling As Probability Machine Failure And Batch Production Scheduling

    Directory of Open Access Journals (Sweden)

    Zahedi Zahedi

    2016-06-01

    Full Text Available This paper discusses integrated model of batch production scheduling and machine maintenance scheduling. Batch production scheduling uses minimize total actual flow time criteria and machine maintenance scheduling uses the probability of machine failure based on Weibull distribution. The model assumed no nonconforming parts in a planning horizon. The model shows an increase in the number of the batch (length of production run up to a certain limit will minimize the total actual flow time. Meanwhile, an increase in the length of production run will implicate an increase in the number of PM. An example was given to show how the model and algorithm work.

  5. Present state of works on development of electron accelerators for energy consuming processes at Efremov Research Institute

    Energy Technology Data Exchange (ETDEWEB)

    Ivanov, A. S.; Maznev, V. P.; Ovchinnikov, V. P.; Svinin, M. P.; Tolstun, N. G. [Efremov Research Institute of Electrophysical Apparatus, Saint-Petersburg (Russian Federation)

    2011-07-01

    Necessity to decrease anthropogenic environmental pollution puts a task of development of HV accelerators for introduction of nature conservation technologies in commercial scale. High efficiency and operation reliability in a power range noticeably higher than already mastered level are required. In design of the accelerators basic units, namely, HV generators, accelerating structures, electron beam irradiation field forming systems and extraction devices solutions that demonstrated already theirs operational capacity in the machines of a lesser power may be used. From the other hand, experience gained by already full-scale built powerful installations shows that a number of problems remain unsolved that put obstacles on a way of wide implementation of exhaust gases irradiation processing. Attempts to built the accelerator meeting all requirements in a frame of specific contracts, although already shown noticeable progress in a sense of the power grow, acquiring of very valuable experience, carry some risk caused by insufficient study of the problems connected with power increasing, lack of time and means for the thorough research works. It looks reasonable to suggest creation of full-scale pilot installation with HV accelerator of required power (1 MW, for example) not bound to a specific commercial contract, where researches and studies of the accelerator main systems, theirs optimization and longevity tests can be carried out thus providing development of the accelerator into really reliable and effective tool for applying to environmental tasks.

  6. HL-LHC Accelerator

    CERN Document Server

    Zimmermann, F

    2013-01-01

    The tentative schedule, key ingredients, as well as progress of pertinent R&D and component prototypes for the LHC luminosity upgrade, "HL-LHC," are reviewed. Also alternative scenarios based on performance-improving consolidations (PICs) instead of a full upgrade are discussed. Tentative time schedules and expected luminosity evolutions for the different scenarios are sketched. The important role of HL-LHC development as a step towards a future HE-LHC or VHE-LHC is finally highlighted. Presented at "Higgs & Beyond" Conference Tohoku University, Sendai 7 June 2013.

  7. Off-Line and Dynamic Production Scheduling – A Comparative Case Study

    Directory of Open Access Journals (Sweden)

    Bożek Andrzej

    2016-03-01

    Full Text Available A comprehensive case study of manufacturing scheduling solutions development is given. It includes highly generalized scheduling problem as well as a few scheduling modes, methods and problem models. The considered problem combines flexible job shop structure, lot streaming with variable sublots, transport times, setup times, and machine calendars. Tabu search metaheuristic and constraint programming methods have been used for the off-line scheduling. Two dynamic scheduling methods have also been implemented, i.e., dispatching rules for the completely reactive scheduling and a multi-agent system for the predictivereactive scheduling. In these implementations three distinct models of the problem have been used, based on: graph representation, optimal constraint satisfaction, and Petri net formalism. Each of these solutions has been verified in computational experiments. The results are compared and some findings about advantages, disadvantages, and suggestions on using the solutions are formulated.

  8. Hybrid and dependent task scheduling algorithm for on-board system software

    Institute of Scientific and Technical Information of China (English)

    魏振华; 洪炳熔; 乔永强; 蔡则苏; 彭俊杰

    2003-01-01

    In order to solve the hybrid and dependent task scheduling and critical source allocation problems, atask scheduling algorithm has been developed by first presenting the tasks, and then describing the hybrid anddependent scheduling algorithm and deriving the predictable schedulability condition. The performance of thisagorithm was evaluated through simulation, and it is concluded from the evaluation results that the hybrid taskscheduling subalgorithm based on the comparison factor can be used to solve the problem of aperiodic task beingblocked by periodic task in the traditional operating system for a very long time, which results in poor schedu-ling predictability; and the resource allocation subalgorithm based on schedulability analysis can be used tosolve the problems of critical section conflict, ceiling blocking and priority inversion; and the scheduling algo-rithm is nearest optimal when the abortable critical section is 0.6.

  9. Development of a Magnetron Resonance Frequency Auto Tuning System for Medical Xband [9300 MHz] RF Linear Accelerator

    Energy Technology Data Exchange (ETDEWEB)

    Cha, Sung Su; Lee, Byung Cheol [University of Science and Technology, Daejeon (Korea, Republic of); Kim, Yujong; Park, Hyung Dal; Lee, Byeong-No; Joo, Youngwoo; Cha, Hyungki; Lee, Soo Min; Song, Ki Baek [KAERI, Daejeon (Korea, Republic of); Lee, Seung Hyun [Sungkyunkwan University, Suwon (Korea, Republic of)

    2015-05-15

    The total components of the accelerator are the magnetron, electron gun, accelerating structure, a set of solenoid magnets, four sets of steering coils, a modulator, and a circulator. One of the accelerator components of the accelerating structure is made of oxygen-free high-conductivity copper (OFHC), and its volume is changed according to the ambient temperature. As the volume changes, the resonant frequency of the accelerating structure is changed. Accordingly, the resonance frequency is mismatched between the source of the magnetron and the accelerating structure. An automatic frequency tuning system is automatically matched with the resonant frequency of the magnetron and accelerating structure, which allows a high output power and reliable accelerator operation. An automatic frequency tuning system is composed of a step motor control part for correcting the frequency of the source and power measuring parts, i.e., the forward and reflected power between the magnetron and accelerating structure. In this paper, the design, fabrication, and RF power test of the automatic frequency tuning system for the X-band linac are presented. A frequency tuning system was developed to overcome an unstable accelerator operation owing to the frequency mismatch between the magnetron and accelerating structure. The frequency measurement accuracy is 100 kHz and 0.72 degree per pulse.

  10. Status report 500 MeV, 10% d.f. linear accelerator (MEA) under construction at Amsterdam

    International Nuclear Information System (INIS)

    Bruinsma, P.J.T.; Vries, C. de.

    1979-03-01

    The design parameters and the general lay-out of buildings and of the main components of the accelerator are presented. Some of the accelerator technology features which are typical for the Amsterdam machine are then described. The performance obtained so far with the first part of the machine is indicated with some remarks on the planning for the next 2 years during which the facility ought to be fully operational. The type of experimental facilities under construction are described and the status and the planning schedule are indicated. (Auth.)

  11. A Mechanized Decision Support System for Academic Scheduling.

    Science.gov (United States)

    1986-03-01

    an operational system called software. The first step in the development phase is Design . Designers destribute software control by factoring the Data...SUBJECT TERMS (Continue on reverse if necessary and identify by block number) ELD GROUP SUB-GROUP Scheduling, Decision Support System , Software Design ...scheduling system . It will also examine software - design techniques to identify the most appropriate method- ology for this problem. " - Chapter 3 will

  12. NASA Schedule Management Handbook

    Science.gov (United States)

    2011-01-01

    The purpose of schedule management is to provide the framework for time-phasing, resource planning, coordination, and communicating the necessary tasks within a work effort. The intent is to improve schedule management by providing recommended concepts, processes, and techniques used within the Agency and private industry. The intended function of this handbook is two-fold: first, to provide guidance for meeting the scheduling requirements contained in NPR 7120.5, NASA Space Flight Program and Project Management Requirements, NPR 7120.7, NASA Information Technology and Institutional Infrastructure Program and Project Requirements, NPR 7120.8, NASA Research and Technology Program and Project Management Requirements, and NPD 1000.5, Policy for NASA Acquisition. The second function is to describe the schedule management approach and the recommended best practices for carrying out this project control function. With regards to the above project management requirements documents, it should be noted that those space flight projects previously established and approved under the guidance of prior versions of NPR 7120.5 will continue to comply with those requirements until project completion has been achieved. This handbook will be updated as needed, to enhance efficient and effective schedule management across the Agency. It is acknowledged that most, if not all, external organizations participating in NASA programs/projects will have their own internal schedule management documents. Issues that arise from conflicting schedule guidance will be resolved on a case by case basis as contracts and partnering relationships are established. It is also acknowledged and understood that all projects are not the same and may require different levels of schedule visibility, scrutiny and control. Project type, value, and complexity are factors that typically dictate which schedule management practices should be employed.

  13. Accelerator mass spectrometry and associated facilities at Inter-University Accelerator Centre, New Delhi, India

    International Nuclear Information System (INIS)

    Kumar, Pankaj; Bohra, Archna; Ojha, S.; Gargari, S.; Joshi, R.; Roonwal, G.S.; Chopra, S.; Pattanaik, J.K.; Balakrishnan, S.

    2011-01-01

    Accelerator Mass Spectrometry (AMS) facility at Inter-University Accelerator Centre (IUAC) is developed by upgrading its existing 15UD Pelletron accelerator. Since last two decades Pelletron is mainly used for nuclear physics, materials science, atomic physics, radiation biology and accelerator mass spectrometry is recent development. In addition, a chemistry laboratory in clean room for the chemical processing of samples for AMS studies has also been established. At present the AMS facility is used for 10 Be, 26 Al measurements and soon other long lived radio-isotopes will also be used

  14. Developing a Model of Compulsory Basic Education Completion Acceleration in Support of Millennium Development Goals in Magelang, Indonesia

    Science.gov (United States)

    Sukarno; Haryati, Sri

    2015-01-01

    This article reports Year One of a two-year study to develop a model to accelerate compulsory basic education completion toward Millennium Development Goals (MDGs) in Magelang, Indonesia. The study focuses on five issues: (1) profile of MDGs in Magelang, (2) achievement of MDGs, (3) problems in MDGs implementation, (4) model of compulsary basic…

  15. Automatic scheduling of maintenance work in nuclear power plants

    International Nuclear Information System (INIS)

    Kasahara, T.; Nishizawa, Y.; Kato, K.; Kiguchi, T.

    1987-01-01

    An automatic scheduling method for maintenance work in nuclear power plants has been developed using an AI technique. The purpose of this method is to help plant operators by adjusting the time schedule of various kinds of maintenance work so that incorrect ordering or timing of plant manipulations does not cause undersirable results, such as a plant trip. The functions of the method were tested by off-line simulations. The results show that the method can produce a satisfactory schedule of plant component manipulations without interference between the tasks and plant conditions

  16. A Systematical Framework of Schedule Risk Management for Power Grid Engineering Projects’ Sustainable Development

    Directory of Open Access Journals (Sweden)

    Rao Rao

    2014-10-01

    Full Text Available Schedule risks are the main threat for high efficiency of schedule management in power grid engineering projects (PGEP. This paper aims to build a systematical framework for schedule risk management, which consists of three dimensions, including the personnel dimension, method dimension and time dimension, namely supervisory personnel, management methods and the construction process, respectively. Responsibilities of staff with varied functions are discussed in the supervisory personnel part, and six stages and their corresponding 40 key works are ensured as the time dimension. Risk identification, analysis, evaluation and prevention together formed the method dimension. Based on this framework, 222 schedule risks occur in the whole process of PGEPs are identified via questionnaires and expert interviews. Then, the relationship among each risk is figured out based on the Interpretative Structure Model (ISM method and the impact of each risk is quantitatively assessed by establishing evaluation system. The actual practice of the proposed framework is verified through the analysis of the first stage of a PGEP. Finally, the results show that this framework of schedule risk management is meaningful for improving the efficiency of project management. It provides managers with a clearer procedure with which to conduct risk management, helps them to timely detect risks and prevent risks from occurring. It is also easy for managers to judge the influence level of each risk, so they can take actions based on the level of each risk’s severity. Overall, it is beneficial for power grid enterprises to achieve a sustainable management.

  17. Production planning and scheduling in refinery industry

    International Nuclear Information System (INIS)

    Persson, Jan.

    1999-01-01

    In this thesis we consider production planning and scheduling in refinery industry, in particular we study the planning and scheduling at the Nynaes AB refinery and at the Scanraff AB refinery. The purpose is to contribute to the development and the use of optimization models to support efficient decision making. We identify various decision problems concerning the aggregated production planning, the shipment planning, the scheduling of operation modes, and the utilization of pipes and tanks; and we discuss the potential to successfully apply optimization models on these problems. We formulate a mixed integer linear programming model for the scheduling of operation modes at Nynaes. The model concerns decisions about which mode of operation to use at a particular point in time in order to minimize costs of changing modes and costs of keeping inventories, given demands for products. We derive several types of valid inequalities for this mathematical problem and show how these inequalities can improve the lower bound obtained from the linear programming relaxation of the problem. We also show how the valid inequalities can be used to improve the performance of a branch and bound solution approach. Further, a tabu search heuristic is developed for the scheduling problem. The solution methods are tested on data provided by the Nynaes refinery, and the performance of the methods are discussed. We present several extensions of the proposed model, and illustrate how the model can be used to support both operational and strategic decision making at the refinery. 66 refs, 6 figs, 32 tabs. Also published as: Dissertation from the International Graduate School of Management and Industrial Engineering, No 25, Licenciate Thesis

  18. Production planning and scheduling in refinery industry

    Energy Technology Data Exchange (ETDEWEB)

    Persson, Jan

    1999-07-01

    In this thesis we consider production planning and scheduling in refinery industry, in particular we study the planning and scheduling at the Nynaes AB refinery and at the Scanraff AB refinery. The purpose is to contribute to the development and the use of optimization models to support efficient decision making. We identify various decision problems concerning the aggregated production planning, the shipment planning, the scheduling of operation modes, and the utilization of pipes and tanks; and we discuss the potential to successfully apply optimization models on these problems. We formulate a mixed integer linear programming model for the scheduling of operation modes at Nynaes. The model concerns decisions about which mode of operation to use at a particular point in time in order to minimize costs of changing modes and costs of keeping inventories, given demands for products. We derive several types of valid inequalities for this mathematical problem and show how these inequalities can improve the lower bound obtained from the linear programming relaxation of the problem. We also show how the valid inequalities can be used to improve the performance of a branch and bound solution approach. Further, a tabu search heuristic is developed for the scheduling problem. The solution methods are tested on data provided by the Nynaes refinery, and the performance of the methods are discussed. We present several extensions of the proposed model, and illustrate how the model can be used to support both operational and strategic decision making at the refinery. 66 refs, 6 figs, 32 tabs. Also published as: Dissertation from the International Graduate School of Management and Industrial Engineering, No 25, Licenciate Thesis.

  19. Production planning and scheduling in refinery industry

    Energy Technology Data Exchange (ETDEWEB)

    Persson, Jan

    1999-06-01

    In this thesis we consider production planning and scheduling in refinery industry, in particular we study the planning and scheduling at the Nynaes AB refinery and at the Scanraff AB refinery. The purpose is to contribute to the development and the use of optimization models to support efficient decision making. We identify various decision problems concerning the aggregated production planning, the shipment planning, the scheduling of operation modes, and the utilization of pipes and tanks; and we discuss the potential to successfully apply optimization models on these problems. We formulate a mixed integer linear programming model for the scheduling of operation modes at Nynaes. The model concerns decisions about which mode of operation to use at a particular point in time in order to minimize costs of changing modes and costs of keeping inventories, given demands for products. We derive several types of valid inequalities for this mathematical problem and show how these inequalities can improve the lower bound obtained from the linear programming relaxation of the problem. We also show how the valid inequalities can be used to improve the performance of a branch and bound solution approach. Further, a tabu search heuristic is developed for the scheduling problem. The solution methods are tested on data provided by the Nynaes refinery, and the performance of the methods are discussed. We present several extensions of the proposed model, and illustrate how the model can be used to support both operational and strategic decision making at the refinery. 66 refs, 6 figs, 32 tabs. Also published as: Dissertation from the International Graduate School of Management and Industrial Engineering, No 25, Licenciate Thesis

  20. Outage scheduling and implementation

    International Nuclear Information System (INIS)

    Allison, J.E.; Segall, P.; Smith, R.R.

    1986-01-01

    Successful preparation and implementation of an outage schedule and completion of scheduled and emergent work within an identified critical path time frame is a result of careful coordination by Operations, Work Control, Maintenance, Engineering, Planning and Administration and others. At the Fast Flux Test Facility (FFTF) careful planning has been responsible for meeting all scheduled outage critical paths