WorldWideScience

Sample records for design licensing implementation

  1. Design, implementation and licensing of improvement measures

    International Nuclear Information System (INIS)

    Rousset, P.

    2000-01-01

    Modifications are designed to contribute to improve the level of safety, and the level of performance of the plants. The successful implementation of a modification depends on the quality of the design and particularly the good fitting of the modification in the existing design, on the perfect consistency of the licensing approach and on the good management of the project constraints and interfaces. Over the last ten years, FRAMATOME has accumulated a large and varied experience in these activities, as shown in the few examples briefly described in the presentation. Within the Mochovce completion project, FRAMATOME has been in charge of the basic design or implementation of about twenty safety measures. This involved establishing efficient partnerships with design organizations and suppliers in the Slovak Republic, Czech Republic, and Russia. A similar approach is used in the frame of the Kozloduy 5-6 modernization program, where the basic engineering contract is conducted since 1998 and the main contract under discussion. From the very beginning of the TACIS program FRAMATOME has been involved in projects dealing with the design of reactor safety systems. For example, an extensive work aiming at developing a methodology for accident analysis in VVER reactor was initiated in 1993, in collaboration with Siemens, Kurchatov Institute and OKB Gidropress. This methodology was recently used successfully in a new project with the objective to evaluate the possible modification of reactor protection signals of some Russian reactors. Within the PHARE program, a complete analysis of the primary to secondary leakage risk was conducted for Paks nuclear power plant. This involved the writing and validation of the relevant emergency procedure, specification of the leak detection system, study of an improved design of the collector cover, and recommendation of some systems modifications. A last example is the study of the modifications of main steam lines performed in the frame

  2. Licensing management system prototype system design

    International Nuclear Information System (INIS)

    Immerman, W.H.; Arcuni, A.A.; Elliott, J.M.; Chapman, L.D.

    1983-11-01

    This report is a design document for a prototype implementation of a licensing management system (LMS) as defined in SAND83-7080. It describes the concept of operations for full implementation of an LMS in accordance with the previously defined functional requirements. It defines a subset of a full LMS suitable for meeting prototype implementation goals, and proposes a system design for this subset. The report describes overall system design considerations consistent with, but more explicit than the general characteristics required by the LMS functional definition. A high level design is presented for just those functions selected for prototype implementation. The report also provides a data element dictionary describing the structured logical data elements required to implement the selected functions

  3. Licensing and advanced fuel designs

    International Nuclear Information System (INIS)

    Davidson, S.L.; Novendstern, E.H.

    1991-01-01

    For the past 15 years, Westinghouse has been actively involved in the development and licensing of fuel designs that contain major advanced features. These designs include the optimized fuel assembly, The VANTAGE 5 fuel assembly, the VANTAGE 5H, and most recently the VANTAGE+ fuel assembly. Each of these designs was supported by extensive experimental data, safety evaluations, and design efforts and required intensive interaction with the US Nuclear Regulatory Commission (NRC) during the review and approval process. This paper presents a description of the licensing approach and how it was utilized by the utilities to facilitate the licensing applications of the advanced fuel designs for their plants. The licensing approach described in this paper has been successfully applied to four major advanced fuel design changes ∼40 plant-specific applications, and >350 cycle-specific reloads in the past 15 years

  4. TVA experience in BWR reload design and licensing

    International Nuclear Information System (INIS)

    Robertson, J.D.

    1986-01-01

    TVA has developed and implemented the capability to perform BWR reload core design and licensing analyses. The advantages accruing from this capability include the tangible cost-savings from performing reload analyses in-house. Also, ''intangible'' benefits such as increased operating flexibility and the ability to accommodate multivendor fuel designs have been demonstrated. The major disadvantage with performing in-house analyses is the cost associated with development and maintenance of the analytical methods and staff expertise

  5. Data bank usage in reload design and licensing

    International Nuclear Information System (INIS)

    Goudey, J.L.; Hansen, E.C.; Scigliano, S.M.; Williams, R.D.

    1986-01-01

    In 1977 the Nuclear Energy Business Operations of General Electric Company (GE) began a major project to automate sequential execution of the data transfer between the various computer programs used in performing calculations to support design, release, licensing, and core management of fuel used in boiling water reactors (BWRs). A centralized and controlled data bank was designed and implemented to complement the data management system and to achieve the following objectives: (1) enhance the quality and reliability of engineering data used for design and licensing of BWR fuel; (2) provide for traceability and long-term retrievability of engineering data as required by 10CFR50, Appendix B; (3) standardize the location and minimize the redundancy of engineering data; and (4) make engineering data readily available to all individuals and computer programs with a need for it. The structure of this data bank, which has become known as the BWR Engineering Data Bank or BWR/EDB, was purposefully left flexible and expandable with the ability to accommodate numerical, logical, and textual data. The BWR/EDB has been used by GE during fuel release, fuel and core design, reload licensing, and core management activities for 30 to 40 commercial power reactors over the past several years

  6. Electronic licensing filing system development and implementation experience

    International Nuclear Information System (INIS)

    Walderhaug, J.

    1993-01-01

    The Electronic Licensing Filing System (ELFS) is a microcomputer-based integrated document search and retrieval system for the Nuclear Regulatory Affairs Division of Southern California Edison (SCE). ELFS allows the user access to the current licensing basis of a subject by providing an easily searchable electronic information data base consisting of regulatory correspondence, design-bases documentation, licensing documents [updated final safety and analysis report (UFSAR) and technical specifications], and regulatory guidance or directives [10CFR, generic letters, bulletins, notices, circulars, regulatory guides, policy statements, and selected US Nuclear Regulatory Commission (NRC) regulations]. It is used in the preparation of correspondence and submittals to the NRC, 50.59 safety evaluations, design-bases reconstitution, and commitment tracking and management

  7. Integration of MGDS design into the licensing process

    International Nuclear Information System (INIS)

    1997-12-01

    This paper presents an overview of how the Mined Geologic Disposal System (MGDS) design for a potential repository is integrated into the licensing process. The integration process employs a two-told approach: (1) ensure that the MGDS design complies with applicable Nuclear Regulatory Commission (NRC) licensing requirements, and (2) ensure that the MGDS design is appropriately reflected in a license application that is acceptable to the NRC for performing acceptance and compliance reviews

  8. RECOGNITION DESIGN OF LICENSE PLATE AND CAR TYPE USING TESSERACT OCR AND EmguCV

    Directory of Open Access Journals (Sweden)

    Antonius Herusutopo

    2012-10-01

    Full Text Available The goal of the research is to design and implement software that can recognize license plates and car types from images. The method used for the research is soft computing using library of EmguCV. There are four phases in creating the software, i.e., input image process, pre-processing, training processing and recognition. Firstly, user enters the car image. Then, the program reads and does pre-processing the image from bitmap form into vector. The next process is training process, which is learning phase in order the system to be able recognize an object (in this case license plate and car type, and in the end is the recognition process itself. The result is data about the car types and the license plates that have been entered. Using simulation, this software successfully recognized license plate by 80.223% accurate and car type 75% accurate.Keywords: Image; Pre-Processing; License plate and Car Type Recognition, Training

  9. DESIGN AND LICENSING TRENDS OF THE GENERAL EDUCATIONAL PROGRAMS IN LATVIA

    OpenAIRE

    Mihailovs, Ivans Jānis; Krūmiņa, Aira Aija

    2016-01-01

    The general education program designing and licensing trends in Latvia in the period from 2010 to 2014 are analyzed in the article. Based on the general education program licensing data, it found that there isn’t a trend to license author’s program in primary education, while the secondary level of education author's programs are designed and licensed more often. The fact that primary education is more licensed programs in mathematics, science and technology, but in general secondary educatio...

  10. Characterization of design ground motion for the central and eastern United States: licensing implications

    International Nuclear Information System (INIS)

    Litehiser, J.; Carrato, P.

    2005-01-01

    For the first time in decades several US utilities are exploring the possibility of building new Nuclear Power Plant (NPP) generating capacity in the Central and Eastern United States (CEUS). Among the many topics that must be considered to license a nuclear plant (NPP) is appropriate design to mitigate the potential effects of vibratory ground motion from earthquakes. Agreement on seismic design ground motion was not always easy during licensing of the last generation of NPPs. Therefore, over the last few decades both industry and the United States Nuclear Regulatory Commission (USNRC) have worked to find ground motion criteria that recognize and overcome earlier licensing difficulties. Such criteria should be stable and easily implemented. Important and complementary programs under the direction of the Lawrence Livermore National Laboratory (LLNL) and the Electric Power Research Institute (EPRI) were part of this effort, and these studies resulted in probabilistic seismic hazard assessments (PSHAs) for a number of CEUS NPP sites. These results and the concepts underlying them are now incorporated into both USNRC regulation and regulatory guidance. Nevertheless, as the utilities and the NRC begin a renewed licensing dialog, issues of regulatory interpretation of earthquake ground motion design criteria have emerged. These issues are as fundamental as the shape and amplitude of ground motion design response spectra and as significant as the impact of these spectra on structural design. Successful and timely resolution of these issues will significantly impact the future of nuclear power in the US. The purpose of this paper is to briefly describe some of these issues and the approaches that have been proposed for their resolution. (authors)

  11. Licensing process for future applications of advanced-design nuclear reactors

    International Nuclear Information System (INIS)

    Miller, C.L.

    1990-01-01

    The existing 10CFR50 two-step licensing process in the Code of Federal Regulations can continue to be a viable licensing vehicle for future applications, at least for the near future. The US Nuclear Regulatory Commission (NRC) Commissioners and staff, the public, and the utilities (along with supporting architect/engineers and nuclear steam supply system vendors) have a vast body of experience and knowledge of the existing part 50 licensing process. All these participants are familiar with their respective roles in this process, and history shows this process to be a workable licensing vehicle. Nevertheless, the use of 10CFR52 should be encouraged for future applications. This proposed new rule is intended to achieve the early resolution of licensing issues, to reduce the complexity and uncertainty of the licensing process, and enhance the safety and reliability of nuclear power plants. Part 52's overall purpose is to improve reactor safety and streamline the licensing process by encouraging the use of standard reactor designs and by allowing the early resolution of site environmental and reactor safety issues. The public should be afforded an earlier entry into the licensing process as a result of design certification rulemaking process and combined construction permit/operating license hearings

  12. New nuclear plant design and licensing process

    International Nuclear Information System (INIS)

    Luangdilok, W.

    1996-01-01

    This paper describes latest developments in the nuclear power reactor technology with emphasis on three areas: (1) the US technology of advanced passive light water reactors (AP600 and S BWR), (2) regulatory processes that certify their safety, and (3) current engineering concerns. The goal is to provide and insight of how the government's regulatory agency guarantees public safety by looking into how new passive safety features were designed and tested by vendors and how they were re-evaluated and retested by the US NRC. The paper then discusses the US 1989 nuclear licensing reform (10 CFR Part 52) whose objectives are to promote the standardization of nuclear power plants and provide for the early and definitive resolution of site and design issues before plants are built. The new licensing process avoids the unpredictability nd escalated construction cost under the old licensing process. Finally, the paper summarizes engineering concerns found in current light water reactors that may not go away in the new design. The concerns are related the material and water chemistry technology in dealing with corrosion problems in water-cooled nuclear reactor systems (PWRs and BWRs). These engineering concerns include core shroud cracking (BWRs), jet pump hold-down beam cracking (BWRs), steam generator tube stress corrosion cracking (PWR)

  13. Implementation procedures for design certification

    International Nuclear Information System (INIS)

    Ritterbusch, S. E.; Brinkman, C. B.; Crump, M. W.

    1995-01-01

    The desire for safer plants arose primarily as the result of the Three Mile Island accident and the realization that plant safety could be impacted by complex plant systems interactions that are not easily identified through the traditional 'system-by-system' design process. Hence, it became apparent that the ALWR designs would have to be addressed through plant-wide Probabilistic Safety Assessments (PSAs) that addressed both accident-prevention and accident-mitigation design features. Prior to Design Certification the 'two-step' licensing process in the United States was not efficient. Utilities had to commit large amounts of capital to plant construction without confidence that an operating license would be issued when construction permit was issued often required design changes that resulted in significant construction delays. The 55 utilities operating nuclear plants in the U. S. each had their own design and operating preferences, resulting in many customized plants with a minimum of economic benefit from standardization. This was addressed by the U. S. Nuclear Regulatory Commission (NRC) in a new regulation (Title 10 of the Code of Federal Regulations, Part 52 or '10 CFR 52') which provides certification of a design that can later be referenced by an applicant for a Combined Operating License (COL). Identifying an ALWR solution for previously unanalyzed severe accident scenarios appeared difficult, at best, since severe accident research had to be performed and since there was no regulatory precedent. This meant that complex technical issues and licensing review policies had to be developed without the benefit of licensing standards or experience. As a result, a system of iterative interactions between the regulator and the industry was established, wherein a design or safety requirement would be proposed, then discussed along with development of the corresponding design feature, and finally revised and documented via NRC 'guidance'

  14. Department of Energy licensing strategy

    International Nuclear Information System (INIS)

    Frei, M.W.

    1984-01-01

    The Department of Energy (DOE) is authorized by the Nuclear Waste Policy Act of 1982 (Act) to site, design, construct, and operate mined geologic repositories for high-level radioactive wastes and is required to obtain licenses from the Nuclear Regulatory Commission (NRC) to achieve that mandate. To this end the DOE has developed a licensing approach which defines program strategies and which will facilitate and ease the licensing process. This paper will discuss the regulatory framework within which the repository program is conducted, the DOE licensing strategy, and the interactions between DOE and NRC in implementing the strategy. A licensing strategy is made necessary by the unique technical nature of the repository. Such a facility has never before been licensed; furthermore, the duration of isolation of waste demanded by the proposed EPA standard will require a degree of reliance on probabilistic performance assessment as proof of compliance that is a first of a kind for any industry. The licensing strategy is also made necessary by the complex interrelationships among the many involved governmental agencies and even within DOE itself, and because these relationships will change with time. Program activities which recognize these relationships are essential for implementing the Act. The guiding principle in this strategy is an overriding commitment to safeguarding public health and safety and to protecting the environment

  15. IRIS project update: status of the design and licensing activities

    International Nuclear Information System (INIS)

    Petrovic, B.; Carelli, M.

    2004-01-01

    This paper presents an overview of the current status of the IRIS (International Reactor Innovative and Secure) project, focusing on the design and licensing activities. An update relative to the previous presentation at the 4th HND Conference is provided, highlighting some of the main accomplishments over the past two years. After successfully completing the conceptual design phase, IRIS is now finalizing the preliminary design as well. The pre-application licensing review with the U.S. NRC has been initiated in October of 2002. The safety-by-design approach and PRA-guided design open the possibility to aim for licensing not requiring off-site emergency response planning. Multiple single-unit and twin-unit site layouts have been developed within the ESP (Early Site Permit) program currently pursued by three U.S. power utilities. Desalination and district heating options have recently been added to the base design. Staggered construction schedules of multiple units may be applied to optimize cash-flow and minimize the required investment, making IRIS a financially attractive option, even for economies with limited investment capabilities. Because of its modularity, compatibility with smaller/medium grids, and enabling gradual build of new generating capacity matching the needs, IRIS has a large potential in the worldwide market.(author)

  16. Comparison of licensing activities for operating plants designed by Babcock and Wilcox

    International Nuclear Information System (INIS)

    Thoma, J.O.

    1985-01-01

    This report provides a comparison of a number of licensing activities for the operating Babcock and Wilcox (B and W) plants with emphasis on Rancho Seco. The factors selected were a comparison of staff resources expended in FY84, active licensing action reviews, implementation of NUREG-0737 modifications, exemptions to regulations, SALP reports, enforcement actions, and Licensee Event Reports (LERs). The eight licensed operating plants examined are as follows: Arkansas Nuclear One Unit 1 (ANO-1), Crystal River Unit 3, Davis Besse, Oconee Units 1, 2, and 3, Rancho Seco, and Three Mile Island Unit 1 (TMI-1)

  17. Licensing topical report: interpretation of general design criteria for high-temperature gas-cooled reactors

    International Nuclear Information System (INIS)

    Orvis, D.D.; Raabe, P.H.

    1980-01-01

    This Licensing Topical Report presents a set of General Design Criteria (GDC) which is proposed for applicability to licensing of graphite-moderated, high-temperature gas-cooled reactors (HTGRs). Modifications as necessary to reflect HTGR characteristics and design practices have been made to the GDC derived for applicability to light-water-cooled reactors and presented in Appendix A of Part 50, Title 10, Code of Federal Regulations, including the Introduction, Definitions, and Criteria. It is concluded that the proposed set of GDC affords a better basis for design and licensing of HTGRs

  18. ACR: Licensing and design readiness

    International Nuclear Information System (INIS)

    Alizadeh, A.

    2009-01-01

    Full text The Canadian nuclear technology has a long history dating back to the 1940s. In this regard, Canada is in a unique situation, shared only by a very few countries, where original nuclear power technology has been invented and further developed. Canadian Nuclear Safety Commission (CNSC), then called AECB, was established in 1946. CNSC focuses on nuclear security, nuclear safety, establishing health and safety regulations, and has also played an instrumental role in the formation of the IAEA. CNSC has provided assistance to the establishment of regulatory authorities in AECL's client countries such as Korea, Argentina, China and Romania. AECL has developed the Gen III+ ACR 1000 as evolutionary advancement of the current CANDU 6 reactor. ACR-1000 has evolved from AECL's in depth experience with CANDU systems, components, and materials, as well as the feedback received from owners and operators of CANDU plants. The ACR-1000 design retains the proven strengths and features of CANDU reactors, while incorporating innovations and state-of-the-art technology. It also features major improvements in economics, inherent safety characteristics, and performance. ACR-1000 has completed its Basic Engineering, has advanced in the licensing process in Canada, and is ready for deployment in Canadian and world markets. EC6 is an evolution of CANDU 6 and is a Gen III natural uranium fuelled reactor. Its medium size and potential for fuel localization and advanced fuel cycles is an optimal strategic solution in many markets.AECL's reactor products are shown to be compliant with a variety of licensing and regulatory requirements. These include the new CNSC DRD-337, IAEA NS-R1, and EUR. This allows the countries interested in CANDU reactor products to be confident of its licensing in their own regulatory regimes.

  19. License Application Design Selection Report, REV 01. August 1999

    International Nuclear Information System (INIS)

    Hastings, C.R.

    1999-01-01

    In December 1998, the U.S. Department of Energy (DOE) published the ''Viability Assessment of a Repository at Yucca Mountain'' (DOE 1998b). The Viability Assessment described a preliminary design of a potential repository at Yucca Mountain, Nevada, for disposal of spent nuclear fuel and high-level radioactive waste, and assessed the probable behavior of that repository design in the Yucca Mountain geologic setting. The report concluded that 'Yucca Mountain remains a promising site for a geologic repository and that work should proceed to support a decision in 2001 on whether to recommend the site to the President for development as a repository'. It also concluded that 'uncertainties remain about key natural processes, the preliminary design, and how the site and design would interact'. Recognizing that the design that was evaluated will be refined before a license application could be submitted, the Viability Aassesment notes that 'DOE is evaluating several design options and alternatives that could reduce existing uncertainty and improve the performance of the repository system'. During the preparation of the Viability Assessment, DOE asked the contractor for the Civilian Radioactive Waste Management Program to study alternative design concepts for a potential geologic repository for high-level radioactive waste at Yucca Mountain. The License Application Design Selection (LADS) project was initiated to conduct that study. The goal of the project was to develop and evaluate a diverse range of conceptual repository designs that work well in concert with the Yucca Mountain site and to recommend an initial design concept for the possible Site Recommendation and License Apllication. This report presents the results of the LADS project. The design process consisted of two phases. In Phase I, a series of basic design concepts (design alternatives) and components (design features) were analyzed for their potential value as elements of a repository design. In Phase II

  20. Impact of ITER liquid metal design options on safety level and licensing - Sweden

    International Nuclear Information System (INIS)

    Harfors, C.; Devell, L.; Johansson, Kjell; Lundell, B.; Rolandsson, S.

    1993-01-01

    The safety level and licensability of five design options for ITER coolant, breeding material and structural material are assessed, with emphasis on some specified accident scenarios. The safety level is assessed in terms of barrier requirements and the feasibility to construct and qualify such a barrier. The licensability in Sweden of each design option is assessed based on the indicated safety level and on a judgement of the technical feasibility to construct and qualify the ITER tokamak itself, based on the selected design option. 20 refs

  1. Aseismic Design Licensings and guidelines for nuclear power plant in Japan

    Energy Technology Data Exchange (ETDEWEB)

    Yoshizawa, Kazumi [Agency of Natural Resources and Energy, Tokyo (Japan)

    1997-03-01

    This paper describes Aseismic Design Licensing for Japanese Nuclear Power Plants which includes system, procedures and brief contents concerned application, permit and inspection, and the `Examination Guide for Aseismic Design of the Nuclear Power Reactor Facilities` which focused principals of seismic design loads, load combinations, and allowable limits. (J.P.N.)

  2. Aseismic Design Licensings and guidelines for nuclear power plant in Japan

    International Nuclear Information System (INIS)

    Yoshizawa, Kazumi

    1997-01-01

    This paper describes Aseismic Design Licensing for Japanese Nuclear Power Plants which includes system, procedures and brief contents concerned application, permit and inspection, and the 'Examination Guide for Aseismic Design of the Nuclear Power Reactor Facilities' which focused principals of seismic design loads, load combinations, and allowable limits. (J.P.N.)

  3. Challenges of SMR licensing practices

    Energy Technology Data Exchange (ETDEWEB)

    Soderholm, K., E-mail: kristiina.soderholm@fortum.com [Fortum Power, Espoo (Finland)

    2012-12-15

    This paper aims to increase the understanding of high level Nuclear Power Plant (NPP) licensing processes in Finland, France, the UK, Canada and the USA. These countries have been selected for this study because of their different licensing processes and recent actions in new NPP construction. After discussing their similarities and differences, suitable features for Small Modular Reactor licensing can be emphasized and suggested. Some of the studied licensing processes have elements that are already quite well suited for application to SMRs, but all of these different national processes can benefit from studying and implementing lessons learned from SMR specific licensing needs. The main SMR features to take into account in licensing are standardization of the design, modularity, mass production and serial construction. Modularity can be divided into two different categories: the first category is simply a single unit facility constructed of independently engineered modules (e.g., construction process for Westinghouse AP-1000 NPP) and the second is a facility structure composed of many reactor modules where modules are manufactured in factories and installed into the facility as needed (e.g., NuScale Power SMR design). Short construction schedules will not be fully benefited from if the long licensing process prolongs the commissioning and approach to full-power operation. The focus area of this study is to better understand the possibility of SMR deployment in small nuclear countries, such as Finland, which currently has four operating NPPs. The licensing process needs to be simple and clear to make SMR deployment feasible from an economical point of view. This paper uses public information and interviews with experts to establish the overview of the different licensing processes and their main steps. A high-level comparison of the licensing steps has been carried out. Certain aspects of the aviation industry licensing process have also been studied and certain

  4. License Application Design Selection Feature Report: Aging and Blending

    International Nuclear Information System (INIS)

    Coltoni, B.; Anderson, M.J.

    1999-01-01

    The purpose of this document is to evaluate the concepts of Aging and Blending for waste sent to the Monitored Geologic Repository (MGR). These design features are based on pre-emplacement treatment of the waste stream. The envelope of the analysis has been performed under the direction of the License Application Design Selection Team (LADST), which advocated utilizing the Viability Assessment (VA) repository design (DOE 1998c) as the basis. Therefore, this evaluation attempts to modify the VA design only to the extent that Aging and Blending can be accomplished. This modified VA design will be contrasted to the VA Design and the difference in design, costs, and performance will be presented

  5. Development of quantitative goals for inherent safety feature design and licensing

    International Nuclear Information System (INIS)

    Kastenberg, W.E.; Apostolakis, G.; Dhir, V.K.; Okrent, D.

    1987-01-01

    There is now considerable interest in the development of advanced fast reactors whose major focus is inherent safety. The achievement of inherent safety can be viewed from several aspects. In the Integral Fast Reactor Concept the approach is to utilize the intrinsic characteristics of pool-type liquid metal fast breeder reactors (LMFBRs) and the properties of metal fuels to integrate a high degree of inherent safety into the design. The PRISM and SAFR concepts focus on other inherent safety features. The reactors discussed above represent a radical departure from existing LWR designs as well as previous LMFBR designs (e.g., CRBRP) which are based, for the most part, on the General Design Criteria found in 10CFR50 Appendix. In view of these parallel developments (advanced reactors exploiting inherent safety and the use of quantitative goals to augment licensing), there appears to be a need to perform research on the development of methods for designing, assessing, and licensing inherent safety features in advanced reactors. The objectives of such research are outlined

  6. Online driver's license renewal.

    Science.gov (United States)

    2015-09-01

    The Kentucky Department of Vehicle Regulation is exploring the possibility of developing and implementing online : drivers license renewal. The objective of this project was to: 1) evaluate online drivers license and REAL ID renewal : programs ...

  7. Streamlining the license renewal review process

    International Nuclear Information System (INIS)

    Dozier, J.; Lee, S.; Kuo, P.T.

    2001-01-01

    The staff of the NRC has been developing three regulatory guidance documents for license renewal: the Generic Aging Lessons Learned (GALL) report, Standard Review Plan for License Renewal (SRP-LR), and Regulatory Guide (RG) for Standard Format and Content for Applications to Renew Nuclear Power Plant Operating Licenses. These documents are designed to streamline the license renewal review process by providing clear guidance for license renewal applicants and the NRC staff in preparing and reviewing license renewal applications. The GALL report systematically catalogs aging effects on structures and components; identifies the relevant existing plant programs; and evaluates the existing programs against the attributes considered necessary for an aging management program to be acceptable for license renewal. The GALL report also provides guidance for the augmentation of existing plant programs for license renewal. The revised SRP-LR allows an applicant to reference the GALL report to preclude further NRC staff evaluation if the plant's existing programs meet the criteria described in the GALL report. During the review process, the NRC staff will focus primarily on existing programs that should be augmented or new programs developed specifically for license renewal. The Regulatory Guide is expected to endorse the Nuclear Energy Institute (NEI) guideline, NEI 95-10, Revision 2, entitled 'Industry Guideline for Implementing the Requirements of 10 CFR Part 54 - The License Renewal Rule', which provides guidance for preparing a license renewal application. This paper will provide an introduction to the GALL report, SRP-LR, Regulatory Guide, and NEI 95-10 to show how these documents are interrelated and how they will be used to streamline the license renewal review process. This topic will be of interest to domestic power utilities considering license renewal and international ICONE participants seeking state-of-the-art information about license renewal in the United States

  8. Cooperation in reactor design evaluation and licensing

    International Nuclear Information System (INIS)

    Kaufer, B.; Wasylyk, A.

    2014-01-01

    In January 2007 the World Nuclear Association (WNA) established the Cooperation in Reactor Design Evaluation and Licensing (CORDEL) Working Group with the aim of stimulating a dialogue between the nuclear industry (including reactor vendors, operators and utilities) and nuclear regulators (national and international organisations) on the benefits and means of achieving a worldwide convergence of reactor safety standards for reactor designs. From the time of its inception to the present, CORDEL has evolved from a group of experts discussing how to achieve international standardisation in nuclear safety design to an established and recognised working group dedicated to analysing and forging common understandings in key areas as input to major decisions on nuclear energy policy. This paper will review the general directions and activities CORDEL plans to undertake during the next five-year period, including its general strategy, activities, priorities and interactions with its customers in order to meet its objectives. (author)

  9. Cooperation in reactor design evaluation and licensing

    Energy Technology Data Exchange (ETDEWEB)

    Kaufer, B.; Wasylyk, A. [World Nuclear Association, London (United Kingdom)

    2014-07-01

    In January 2007 the World Nuclear Association (WNA) established the Cooperation in Reactor Design Evaluation and Licensing (CORDEL) Working Group with the aim of stimulating a dialogue between the nuclear industry (including reactor vendors, operators and utilities) and nuclear regulators (national and international organisations) on the benefits and means of achieving a worldwide convergence of reactor safety standards for reactor designs. From the time of its inception to the present, CORDEL has evolved from a group of experts discussing how to achieve international standardisation in nuclear safety design to an established and recognised working group dedicated to analysing and forging common understandings in key areas as input to major decisions on nuclear energy policy. This paper will review the general directions and activities CORDEL plans to undertake during the next five-year period, including its general strategy, activities, priorities and interactions with its customers in order to meet its objectives. (author)

  10. Presentation summary, safety design aspects and U.S. licensing challenges of the pebble bed modular reactor

    International Nuclear Information System (INIS)

    Sproat, Ward; Slabber, Johan

    2001-01-01

    This presentation consists of three sections: An overview of the status of the PBMR project in South Africa, a review of the design features and philosophy being utilized to design the PBMR, and a summary of the key licensing issues that Exelon has identified in assessing the licensability of the PBMR for application in this country

  11. Licensing aspects in the verification of the SNR 300 design concept against hypothetical accidents

    International Nuclear Information System (INIS)

    Kugler, E.; Wiesner, S.

    1976-01-01

    The German prototype of a fast breeder reactor, the SNR 300, is being built near Kalkar on the Lower Rhine. It is a loop-type fast sodium-cooled reactor, designed and constructed by Interatom, Bensberg. Experiences gained from the first phase of construction are described. The report is restricted to the aspects of the SNR 300 design against a core disruptive accident (CDA) and its consequences and to the difficulties having arisen in the verification of the design concept so far. Some examples of the detailed design are described and discussed from the licensing authority's point of view showing that the difficulties have been typical for a prototype reactor subjected to a regular licensing procedure

  12. Application of up-front licensing

    Energy Technology Data Exchange (ETDEWEB)

    Grant, S D [Atomic Energy of Canada Ltd., Saskatoon, SK (Canada); Snell, V G [Atomic Energy of Canada Ltd., Mississauga, ON (Canada)

    1996-12-31

    AECL has been pioneering `up-front` licensing of new reactor designs. The CANDU 3 design has been formally reviewed by AECB staff for a number of years. The CANDU 9 design has just started the up-front licensing process. The process gives designers, regulators and potential customers early confidence in the licensability of future plants. (author). 4 refs., 2 tabs.

  13. Application of up-front licensing

    International Nuclear Information System (INIS)

    Grant, S.D.; Snell, V.G.

    1995-01-01

    AECL has been pioneering 'up-front' licensing of new reactor designs. The CANDU 3 design has been formally reviewed by AECB staff for a number of years. The CANDU 9 design has just started the up-front licensing process. The process gives designers, regulators and potential customers early confidence in the licensability of future plants. (author). 4 refs., 2 tabs

  14. Assessment of the licensing aspects of HTGR in Yugoslavia

    International Nuclear Information System (INIS)

    Varazdinec, Z.

    1990-01-01

    This paper deals not only with the licensing procedure in Yugoslavia, but also reflects the Utility/Owner approach to the assessment of the licensability of the HTGR during the site selection process and especially during bid evaluation process. Besides the description of the existing procedure which was implemented on licensing of LWR program, the assessment of some licensing aspects of HTGR has been presented to describe possible implementation on licensing procedure. (author)

  15. Assessment of the licensing aspects of HTGR in Yugoslavia

    Energy Technology Data Exchange (ETDEWEB)

    Varazdinec, Z [Institut za Elektroprivredu-Zagreb, Zagreb (Yugoslavia)

    1990-07-01

    This paper deals not only with the licensing procedure in Yugoslavia, but also reflects the Utility/Owner approach to the assessment of the licensability of the HTGR during the site selection process and especially during bid evaluation process. Besides the description of the existing procedure which was implemented on licensing of LWR program, the assessment of some licensing aspects of HTGR has been presented to describe possible implementation on licensing procedure. (author)

  16. Technical and economic effect analysis of advanced MMIS implementation in KNGR

    International Nuclear Information System (INIS)

    Choe, Il Nam

    1997-01-01

    KNGR MMIS design approaches are summarized as follows: 1) compact workstation type operator console design to reduce the operators' physical and cognitive work loads by implementing Factors Engineering (HFE) principles and advanced graphic user interface technologies. 2) Full digital control and protection system design to enhance the reliability operability and maintainability. 3) Remote signal multiplexer implementation to reduce the hard-wired cable and cable installation cost and time. 4) Licensable design to meet latest licensing requirements including HFE and safety software validation and verification. 5 refs., 1 tab., 1 fig

  17. ITER licensing

    International Nuclear Information System (INIS)

    Gordon, C.W.

    2005-01-01

    ITER was fortunate to have four countries interested in ITER siting to the point where licensing discussions were initiated. This experience uncovered the challenges of licensing a first of a kind, fusion machine under different licensing regimes and helped prepare the way for the site specific licensing process. These initial steps in licensing ITER have allowed for refining the safety case and provide confidence that the design and safety approach will be licensable. With site-specific licensing underway, the necessary regulatory submissions have been defined and are well on the way to being completed. Of course, there is still work to be done and details to be sorted out. However, the informal international discussions to bring both the proponent and regulatory authority up to a common level of understanding have laid the foundation for a licensing process that should proceed smoothly. This paper provides observations from the perspective of the International Team. (author)

  18. Guidelines to implement the license renewal technical requirements of 10CFR54 for integrated plant assessments and time-limited aging analyses. Final report

    International Nuclear Information System (INIS)

    Lehnert, G.; Philpot, L.

    1995-11-01

    This report documents the initial results of the Nuclear Energy Institute License Renewal Implementation Guideline Task Force over the period August 1994 to July 1995 to develop guidance for complying with technical requirements of 10CFR54. The report also provided a starting point for the development of NEI 95-10, ''Industry Guideline for Implementing the Requirements of 10CCR54-The License Renewal Rule''. Information in this document can be used by utilities to prepare the technical material needed in an application for license renewal (LR) of a nuclear power unit. This guideline provides methods for identifying systems, structures, and components (SSCs) and their intended functions within the scope of license renewal. It identifies structures and components (SCs) requiring aging management review and methods for performing the aging management review. The guideline provides a process for identifying and evaluating time-limited aging analyses

  19. NUCLEAR SAFETY DESIGN BASES FOR LICENSE APPLICATION

    International Nuclear Information System (INIS)

    Garrett, R.J.

    2005-01-01

    The purpose of this report is to identify and document the nuclear safety design requirements that are specific to structures, systems, and components (SSCs) of the repository that are important to safety (ITS) during the preclosure period and to support the preclosure safety analysis and the license application for the high-level radioactive waste (HLW) repository at Yucca Mountain, Nevada. The scope of this report includes the assignment of nuclear safety design requirements to SSCs that are ITS and does not include the assignment of design requirements to SSCs or natural or engineered barriers that are important to waste isolation (ITWI). These requirements are used as input for the design of the SSCs that are ITS such that the preclosure performance objectives of 10 CFR 63.111 [DIRS 156605] are met. The natural or engineered barriers that are important to meeting the postclosure performance objectives of 10 CFR 63.113 [DIRS 156605] are identified as ITWI. Although a structure, system, or component (SSC) that is ITS may also be ITWI, this report is only concerned with providing the nuclear safety requirements for SSCs that are ITS to prevent or mitigate event sequences during the repository preclosure period

  20. To License or Not to License Remanufacturing Business?

    Directory of Open Access Journals (Sweden)

    Zu-Jun Ma

    2018-01-01

    Full Text Available Many original equipment manufacturers (OEMs face the choice of whether to license an independent remanufacturer (IR to remanufacture their used products. In this paper, we develop closed-loop supply chain models with licensed and unlicensed remanufacturing operations to analyze the competition and cooperation between an OEM and an IR. The OEM sells new products and collects used products through trade-ins, while the IR intercepts the OEM’s cores to produce remanufactured products and sell them in the same market. We derive optimal decisions for each of the two types of firms in licensed and unlicensed remanufacturing scenarios and identify conditions under which the OEM and the IR would be most likely to cooperate with each other in implementing remanufacturing. The results show although it is beneficial for an OEM to license an IR to remanufacture its cores, it is not always necessary for an IR to accept OEM’s authorization. Moreover, we contrast the result for licensed remanufacturing scenario in the decentralized system with that in the centrally coordinated system to quantify potential inefficiency resulting from decentralization of decision making.

  1. The successful implementation of a licensed data management interface between a Sunquest(®) laboratory information system and an AB SCIEX™ mass spectrometer.

    Science.gov (United States)

    French, Deborah; Terrazas, Enrique

    2013-01-01

    Interfacing complex laboratory equipment to laboratory information systems (LIS) has become a more commonly encountered problem in clinical laboratories, especially for instruments that do not have an interface provided by the vendor. Liquid chromatography-tandem mass spectrometry is a great example of such complex equipment, and has become a frequent addition to clinical laboratories. As the testing volume on such instruments can be significant, manual data entry will also be considerable and the potential for concomitant transcription errors arises. Due to this potential issue, our aim was to interface an AB SCIEX™ mass spectrometer to our Sunquest(®) LIS. WE LICENSED SOFTWARE FOR THE DATA MANAGEMENT INTERFACE FROM THE UNIVERSITY OF PITTSBURGH, BUT EXTENDED THIS WORK AS FOLLOWS: The interface was designed so that it would accept a text file exported from the AB SCIEX™ × 5500 QTrap(®) mass spectrometer, pre-process the file (using newly written code) into the correct format and upload it into Sunquest(®) via file transfer protocol. The licensed software handled the majority of the interface tasks with the exception of converting the output from the Analyst(®) software to the required Sunquest(®) import format. This required writing of a "pre-processor" by one of the authors which was easily integrated with the supplied software. We successfully implemented the data management interface licensed from the University of Pittsburgh. Given the coding that was required to write the pre-processor, and alterations to the source code that were performed when debugging the software, we would suggest that before a laboratory decides to implement such an interface, it would be necessary to have a competent computer programmer available.

  2. EMPIRICAL STUDY OF CAR LICENSE PLATES RECOGNITION

    Directory of Open Access Journals (Sweden)

    Nasa Zata Dina

    2015-01-01

    Full Text Available The number of vehicles on the road has increased drastically in recent years. The license plate is an identity card for a vehicle. It can map to the owner and further information about vehicle. License plate information is useful to help traffic management systems. For example, traffic management systems can check for vehicles moving at speeds not permitted by law and can also be installed in parking areas to se-cure the entrance or exit way for vehicles. License plate recognition algorithms have been proposed by many researchers. License plate recognition requires license plate detection, segmentation, and charac-ters recognition. The algorithm detects the position of a license plate and extracts the characters. Various license plate recognition algorithms have been implemented, and each algorithm has its strengths and weaknesses. In this research, I implement three algorithms for detecting license plates, three algorithms for segmenting license plates, and two algorithms for recognizing license plate characters. I evaluate each of these algorithms on the same two datasets, one from Greece and one from Thailand. For detecting li-cense plates, the best result is obtained by a Haar cascade algorithm. After the best result of license plate detection is obtained, for the segmentation part a Laplacian based method has the highest accuracy. Last, the license plate recognition experiment shows that a neural network has better accuracy than other algo-rithm. I summarize and analyze the overall performance of each method for comparison.

  3. Nuclear Safety Design Base for License Application

    International Nuclear Information System (INIS)

    R.J. Garrett

    2005-01-01

    The purpose of this report is to identify and document the nuclear safety design requirements that are specific to structures, systems, and components (SSCs) of the repository that are important to safety (ITS) during the preclosure period and to support the preclosure safety analysis and the license application for the high-level radioactive waste (HLW) repository at Yucca Mountain, Nevada. The scope of this report includes the assignment of nuclear safety design requirements to SSCs that are ITS and does not include the assignment of design requirements to SSCs or natural or engineered barriers that are important to waste isolation (ITWI). These requirements are used as input for the design of the SSCs that are ITS such that the preclosure performance objectives of 10 CFR 63.111(b) [DIRS 173273] are met. The natural or engineered barriers that are important to meeting the postclosure performance objectives of 10 CFR 63.113(b) and (c) [DIRS 173273] are identified as ITWI. Although a structure, system, or component (SSC) that is ITS may also be ITWI, this report is only concerned with providing the nuclear safety requirements for SSCs that are ITS to prevent or mitigate event sequences during the repository preclosure period

  4. Human Factors Guidance for Control Room and Digital Human-System Interface Design and Modification, Guidelines for Planning, Specification, Design, Licensing, Implementation, Training, Operation and Maintenance

    Energy Technology Data Exchange (ETDEWEB)

    R. Fink, D. Hill, J. O' Hara

    2004-11-30

    Nuclear plant operators face a significant challenge designing and modifying control rooms. This report provides guidance on planning, designing, implementing and operating modernized control rooms and digital human-system interfaces.

  5. Human Factors Guidance for Control Room and Digital Human-System Interface Design and Modification. Guidelines for Planning, Specification, Design, Licensing, Implementation, Training, Operation and Maintenance

    International Nuclear Information System (INIS)

    Fink, R.; Hill, D.; O'Hara, J.

    2004-01-01

    Nuclear plant operators face a significant challenge designing and modifying control rooms. This report provides guidance on planning, designing, implementing and operating modernized control rooms and digital human-system interfaces

  6. Design, Implementation and Testing of a Tiny Multi-Threaded DNS64 Server

    Directory of Open Access Journals (Sweden)

    Gábor Lencse

    2016-03-01

    Full Text Available DNS64 is going to be an important service (together with NAT64 in the upcoming years of the IPv6 transition enabling the clients having only IPv6 addresses to reach the servers having only IPv4 addresses (the majority of the servers on the Internet today. This paper describes the design, implementation and functional testing of MTD64, a flexible, easy to use, multi-threaded DNS64 proxy published as a free software under the GPLv2 license. All the theoretical background is introduced including the DNS message format, the operation of the DNS64 plus NAT64 solution and the construction of the IPv4-embedded IPv6 addresses. Our design decisions are fully disclosed from the high level ones to the details. Implementation is introduced at high level only as the details can be found in the developer documentation. The most important parts of a through functional testing are included as well as the results of some basic performance comparison with BIND.

  7. Answers to questions at public meetings regarding implementation of Title 10, Code of Federal Regulations, Part 55 on operators' licenses

    International Nuclear Information System (INIS)

    1987-11-01

    This document presents questions and answers based on the transcripts of four public meetings (and from written questions submitted after the meetings) conducted from April 9 to April 20, 1987 by the staff of the US Nuclear Regulatory Commission. The meetings discussed implementation of the Commission's final rule governing Operators' Licenses and Conforming Amendments (10 CFR Parts 55 and 50). The rule became effective May 26, 1987 and is intended to clarify the regulations for issuing licenses to operators and senior operators; revise the requirements and scope of written examinations and operating tests for operators and senior operators, require a simulation facility; clarify procedures for administering requalification examinations; and describe the form and content for operator license applications

  8. Licensing requirements for initial commissioning programs in Spain: Application to different PWR designs

    International Nuclear Information System (INIS)

    Munuera, A.; Conde, J.M.; Martinez, J.

    1991-01-01

    This paper describes the overall licensing process in Spain, focusing on the initial commissioning requirements. The significance of this part of the regulatory work is evident both from the licensing and the licensee's points of view. Licensing in Spain is ruled by different laws which determine the general requirements and fix the licensing frame. Being a nuclear technology importer country, the base of the regulatory work lies on the rules and regulations of the country of origin of the planet, with the addition of case specific requirements. The application of this methodology to plants designed in different countries produces licensing processes which are similar to the overall, but very different in its development. It also means a special technical effort on the part of the regulatory body to cope with the problems arising from the use of different technologies and safety standards. The start-up programs from fuel loading to full power of a Westinghouse plant (Vandellos 2) and a Siemens-KWU plant (Trillo 1) are compared from the technical point of view, enhancing the differences that can be relevant for the regulatory work. The difficulties arising from the application of both the German and US concepts are discussed. (orig.)

  9. Establishing a safety and licensing basis for generation IV advanced reactors. License by test

    International Nuclear Information System (INIS)

    Kadak, Andrew C.

    2001-01-01

    The license by test approach to licensing is a novel method of licensing reactors. It provides an opportunity to deal with innovative non-water reactors in a direct way on a time scale that could permit early certification based on tests of a demonstration reactor. The uncertainties in the design and significant contributors to risk would be identified in the PRA during the design. Deterministic analysis computer codes could be tested on a real reactor. Scaling effects and associated uncertainties would be minimized. License by test is an approach that has sufficient merit to be developed and tested

  10. PBMR-SA licensing project organization

    International Nuclear Information System (INIS)

    Clapisson, G.A.; Metcalf, P.E.; Mysen, A.

    2001-01-01

    The South African nuclear regulatory authority, the Council for Nuclear Safety (CNS), is beginning the safety review of the Pebble Bed Modular Reactor (PBMR) design under development by the South African National Electrical Utility, Eskom. This paper describes the CNS licensing process, including the establishment of basic licensing criteria, general design criteria, and specific design rules, as well the safety assessment to be conducted in accordance with the established structure. It also summarises the CNS PBMR review project activities, including the overall organisational arrangements, licensing basis, safety and risk assessment, general operating rules and plant design engineering, and pre-operational testing. (author)

  11. The comparison of license management procedure for nuclear power plant in China and United States

    International Nuclear Information System (INIS)

    Yu Zusheng

    2006-01-01

    'Tow steps' license management procedure for nuclear power plant has been performed bas- ted on the requirement of 10CFR Part50-DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES in United States since last century fifties. In order to ulterior reduce the risk of investment and technical for new construction nuclear power plants, new regulations 'One step' license management procedure-10CFR Part52-EARLY SITE PERMITS; STANDARD DESIGN CERTIFICATIONS; AND COMBINED LICENSES FOR NUCLEAR POWER PLANTS issued in 1989. The new regulations has been adopted by new design of nuclear power plant, for example AP1000. ‘The similar tow steps’ license management procedure for nuclear power plant has been performed basted on the requirement of HAFO01/01 Rules for the Implementation of Regulations on the Safety Regulation for Civilian Nuclear Installations of the People's Re- public of China Part One: Application and Issuance of Safety License for Nuclear Power Plant (December 1993) in China since last century nineties. This article introduces and compares the requirements and characteristics of above license management procedure for nuclear power plant in China and United States. (author)

  12. Perspective about the US license Renewal for NNPP's

    International Nuclear Information System (INIS)

    Lehnert, D. F.

    2004-01-01

    This article provides and overview of the US License Renewal Rule, 10 CFR 54, and its implementation in the US leading to the preparation and review of a license renewal application. The key regulatory documents and the industry's methodology and guidance for successfully implementing the Rule are discussed. While the process still undergoes change and optimization, it has become predictable and reliable, such that utilities can establish realistic schedules and budgets to complete the license renewal process. Nearly 60% of the US operating units have either received and extended operating license, have submitted their application for review, or have committed to submit an application in the next few years. The article concludes with a discussion of lessons learned from this wealth of experience and some emerging issues that may affect license renewal process. (Author)

  13. Review process for license renewal applications

    International Nuclear Information System (INIS)

    Craig, John W.; Kuo, P.T.

    1991-01-01

    In preparation for license renewal reviews, the Nuclear Regulatory Commission has recently published for public review and comment a proposed rule for license renewal and a draft Standard Review Plan as well as a draft Regulatory Guide relating to the implementation of the proposed rule. In support of future license renewal applications, the nuclear industry has also submitted 11 industry reports for NRC review and approval. This paper briefly describe how these parallel regulatory and industry activities will be factored into the NRC review process for license renewal. (author)

  14. ITER Safety and Licensing

    International Nuclear Information System (INIS)

    Girard, J-.P; Taylor, N.; Garin, P.; Uzan-Elbez, J.; GULDEN, W.; Rodriguez-Rodrigo, L.

    2006-01-01

    The site for the construction of ITER has been chosen in June 2005. The facility will be implemented in Europe, south of France close to Marseille. The generic safety scheme is now under revision to adapt the design to the host country regulation. Even though ITER will be an international organization, it will have to comply with the French requirements in the fields of public and occupational health and safety, nuclear safety, radiation protection, licensing, nuclear substances and environmental protection. The organization of the central team together with its partners organized in domestic agencies for the in-kind procurement of components is a key issue for the success of the experimentation. ITER is the first facility that will achieve sustained nuclear fusion. It is both important for the experimental one-of-a-kind device, ITER itself, and for the future of fusion power plants to well understand the key safety issues of this potential new source of energy production. The main safety concern is confinement of the tritium, activated dust in the vacuum vessel and activated corrosion products in the coolant of the plasma-facing components. This is achieved in the design through multiple confinement barriers to implement the defence in depth approach. It will be demonstrated in documents submitted to the French regulator that these barriers maintain their function in all postulated incident and accident conditions. The licensing process started by examination of the safety options. This step has been performed by Europe during the candidature phase in 2002. In parallel to the final design, and taking into account the local regulations, the Preliminary Safety Report (RPrS) will be drafted with support of the European partner and others in the framework of ITER Task Agreements. Together with the license application, the RPrS will be forwarded to the regulatory bodies, which will launch public hearings and a safety review. Both processes must succeed in order to

  15. Environmental qualification design for NPP refurbishment to comply with revised licensing requirements

    International Nuclear Information System (INIS)

    MacBeth, M. J.; Hemmings, R. L.

    2002-01-01

    Recent Canadian Nuclear Regulatory decisions have imposed Environmental Qualification (EQ) requirements for twenty-four Reactor Building (RB) airlocks at the four-unit Pickering Nuclear Generating Station-B (PNGS-B) facility. This paper describes the EQ modification design work completed by CANATOM-NPM for the problematic aspects for such projects. The airlocks allow RB access while providing a containment boundary and are designed to prevent a potential breach of containment for all analysed station conditions. Each PNGS-B unit has three large equipment airlocks and three smaller personnel airlocks. The airlocks must function under postulated worst-case design basis accident(DBA) conditions for assigned mission durations. The design must ensure that accident conditions cannot spuriously initiate an un-requested door opening. CANATOM-NPM reviewed site data to specify the necessary EQ modifications required to satisfy licensing requirements while providing a correct and complete as-found record of the existing airlock installation. The design team assessed the installed airlocks configuration against environmental qualification requirements to finalize the list of necessary modifications. A comprehensive, cross-discipline review of proposed design changes was completed to identify any further changes required to satisfy the final EQ licensing goal. The design team also conducted a design review of the EQ modification installation strategy to integrate the design deliverables with the installation team requirements while attempting to minimize necessary outage time for EQ modification installations. This project was completed on schedule and within the cost limitations required by the client with comprehensive, high quality final design packages. Overall improvements were realized for OPG system drawings and the electronic documentation of design data. The EQ modifications designed by CANATOM-NPM will ensure the continued operation of the PNGS-B NPP past December 31

  16. EC6 design features and pre-project licensing review

    Energy Technology Data Exchange (ETDEWEB)

    Yu, S.; Lee, A.G.; Dinh, N.B.; Soulard, M. [CANDU Energy Inc., Mississauga, Ontario, (Canada)

    2013-07-01

    The Enhanced CANDU 6 (EC6) is the new Generation III CANDU reactor design that meets the most up to date Canadian regulatory requirements and customer expectations. Candu Energy Inc. is finalizing development of the EC6 which incorporates the CANDU 6's well-proven features, and adds enhancements that strengthened reactor safety margin and improved operability. The EC6 builds on the proven high performance design and the defence-in-depth features of CANDU 6 units, and has incorporated extensive operational feedback including lessons learned from Fukushima. This paper will provide status of the engineering program including progress on the pre-licensing review of the EC6 design by the Canadian Regulator, CNSC, and will also highlight the design and safety enhancements incorporated in the EC6 product. Safety enhancements to meet safety goals and to improve robustness of systems to respond to design basis accidents and beyond design basis accidents include: new severe accident recovery and heat removal system; improved emergency heat removal system; faster shutoff rods with improved safety margins; mechanical guaranteed shutdown rods; daily load cycling capability; robust containment with containment filter venting system; and improved backed-up electrical supply and cooling services. (author)

  17. The successful implementation of a licensed data management interface between a Sunquest® laboratory information system and an AB SCIEX TM mass spectrometer

    Directory of Open Access Journals (Sweden)

    Deborah French

    2013-01-01

    Full Text Available Background: Interfacing complex laboratory equipment to laboratory information systems (LIS has become a more commonly encountered problem in clinical laboratories, especially for instruments that do not have an interface provided by the vendor. Liquid chromatography-tandem mass spectrometry is a great example of such complex equipment, and has become a frequent addition to clinical laboratories. As the testing volume on such instruments can be significant, manual data entry will also be considerable and the potential for concomitant transcription errors arises. Due to this potential issue, our aim was to interface an AB SCIEX TM mass spectrometer to our Sunquest® LIS. Materials and Methods: We licensed software for the data management interface from the University of Pittsburgh, but extended this work as follows: The interface was designed so that it would accept a text file exported from the AB SCIEX TM × 5500 QTrap® mass spectrometer, pre-process the file (using newly written code into the correct format and upload it into Sunquest® via file transfer protocol. Results: The licensed software handled the majority of the interface tasks with the exception of converting the output from the Analyst® software to the required Sunquest® import format. This required writing of a "pre-processor" by one of the authors which was easily integrated with the supplied software. Conclusions: We successfully implemented the data management interface licensed from the University of Pittsburgh. Given the coding that was required to write the pre-processor, and alterations to the source code that were performed when debugging the software, we would suggest that before a laboratory decides to implement such an interface, it would be necessary to have a competent computer programmer available.

  18. License renewal - an idea whose time has come. Hatch nuclear plant license renewal program: an actual example of application of the license renewal rule to the Intake Structure

    International Nuclear Information System (INIS)

    Chandiwala, F.; Evans, W.P.

    1999-01-01

    After the NRC issued a revised license renewal rule in May 1995, the nuclear industry focussed on developing generic industry for implementing the rule and testing the guidance through various demonstration programs and work products in conjunction with the NRC. In addition, plant-specific programs also proceeded forward. These activities show that implementation issues continue to exist. Since the issuance of the rule, the NRC has issued a draft standard review plan for license renewal (SRP-LR), working draft, September 1997. Southern Nuclear Operating Company (SNC) has begun development work on a license renewal application for Plant Hatch Units 1 and 2. Plant Hatch Units 1 and 2 are BWR 4, Mark I plants whose operating licenses expire in 2014 and 2018, respectively. The Plant Hatch initiative also involves teaming with other boiling water reactors (BWRs) to develop the license renewal technology within the BWR fleet, and to support Plant Hatch by providing an oversight role for the application process. The teaming effort involved two other utilities, each being assigned to prepare a common report on a mechanical system or a structure. The common report could be presented to the NRC with modifications to suit the individual plants, thereby saving time and money, and hopefully resulting in quicker approval by the NRC. The desired license renewal process end result is a renewed license with up to a 20 year extension (10CFR 54.31(b)). (orig.)

  19. Issues related to the licensing of final disposal facilities for radioactive waste

    International Nuclear Information System (INIS)

    Medici, M.A.; Alvarez, D.E.; Lee Gonzales, H.; Piumetti, E.H.; Palacios, E.

    2010-01-01

    The licensing process of a final disposal facility for radioactive waste involves the design, construction, pre-operation, operation, closure and post closure stages. While design and pre-operational stages are, to a reasonable extent, similar to other kind of nuclear or radioactive facilities, construction, operation, closure and post-closure of a radioactive waste disposal facility have unique meanings. As consequence of that, the licensing process should incorporate these particularities. Considering the long timeframes involved at each stage of a waste disposal facility, it is convenient that the development of the project being implemented in and step by step process, be flexible enough as to adapt to new requirements that would arise as a consequence of technology improvements or due to variations in the socio-economical and political conditions. In Argentina, the regulatory Standard AR 0.1.1 establishes the general guideline for the 'Licensing of Class I facilities (relevant facilities)'. Nevertheless, for radioactive waste final disposal facilities a new specific guidance should be developed in addition to the Basic Standard mentioned. This paper describes the particularities of final disposal facilities indicating that a specific licensing system for this type of facilities should be foreseen. (authors) [es

  20. IRIS pre-application licensing

    International Nuclear Information System (INIS)

    Carelli, Mario D.; Kling, Charles L.; Ritterbusch, Stanley E.

    2003-01-01

    This paper presents the approach to pre-application licensing by the International Reactor Innovative and Secure (IRIS), and advanced, integral reactor design with a thermal power of 1000 MW. The rationale for the pre-application licensing is discussed. Since IRIS technology is based on proven LWR experience, the project will rely on AP600/AP1000 precedent and will focus during the pre-application on long lead and novel items. A discussion of the evolution of the project to significantly reduce licensing issues is provided, followed by a summary of the IRIS safety-by-design which provides a formidable first step in the Defense in Depth approach. The effects of the safety-by-design, as well as of passive systems, on the IRIS safety will be investigated in a proposed testing program that will be reviewed by NRC during the pre-application. Documentation to be provided to NRC is discussed. Early design analyses indicate that the benefits of the IRIS safety-by-design approach are so significant that the basic premise of current emergency planning regulations (i.e., likelihood of core damage) will be reduced to the extent that special emergency response planning beyond the exclusion area boundary may not be needed. How this very significant outcome can be effected through a highly risk-informed licensing is discussed. (author)

  1. Implementation Plan for Qualification of Sodium-Cooled Fast Reactor Technology Information

    Energy Technology Data Exchange (ETDEWEB)

    Moe, Wayne [Idaho National Lab. (INL), Idaho Falls, ID (United States); Honma, George [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2016-03-01

    This document identifies and discusses implementation elements that can be used to facilitate consistent and systematic evaluation processes relating to quality attributes of technical information (with focus on SFR technology) that will be used to support licensing of advanced reactor designs. Information may include, but is not limited to, design documents for SFRs, research-and-development (R&D) data and associated documents, test plans and associated protocols, operations and test data, international research data, technical reports, and information associated with past U.S. Nuclear Regulatory Commission (NRC) reviews of SFR designs. The approach for determining acceptability of test data, analysis, and/or other technical information is based on guidance provided in INL/EXT-15-35805, “Guidance on Evaluating Historic Technology Information for Use in Advanced Reactor Licensing.” The implementation plan can be adopted into a working procedure at each of the national laboratories performing data qualification, or by applicants seeking future license application for advanced reactor technology.

  2. Current status of the PBMR licensing project

    International Nuclear Information System (INIS)

    Mysen, A.; Clapisson, G.A.; Metcalf, P.E.

    2000-01-01

    The CNS is currently reviewing the PBMR conceptual design from a licensibility point of view. The PBMR concept is based on a High Temperature Gas Cooled Reactor - pebble bed reactor type. It is anticipated that the PBMR design will rely on inherent safety characteristics to contain fission products within fuel over the full range of design basis events. This feature combined with the high temperature integrity of the fuel and structural graphite, allows the safe use of a high coolant temperature, which allows consideration of the future development of this reactor for non-electrical applications of nuclear heat for industrial use. The CNS licensing approach requires that the licensing and design basis of the plant should respect prevailing international norms and practices and that a quantitative risk assessment should demonstrate compliance with the CNS fundamental safety standards. The first stage of the licensing process is now ongoing; this is a pre-application phase, which will result in a statement on licensibility being issued. Identification of the specific documentation requirements and information needed is required across every step of the licensing process. Top level regulatory requirements have been established for the PBMR. They include the CNS fundamental safety standard and basic licensing criteria, which describes requirements on licensees of nuclear installations regarding risk assessment and compliance with the safety criteria and define classification of licensing basis events. (author)

  3. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1981-08-01

    The Operating Reactors Licensing Actions Summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors

  4. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-04-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis

  5. The pre-licensing of a multi-purpose hybrid research reactor for high-tech applications 'MYRRHA'

    International Nuclear Information System (INIS)

    Hakimi, N.; Dams, C.; Wertelaers, A.; Nys, V.; Schrauben, M.; Dresselaers, R.

    2013-01-01

    The Belgian Nuclear Research Centre in Mol has been working for several years on the design of a multi-purpose flexible irradiation facility in order to replace the ageing BR2, a multipurpose materials testing reactor (MTR), in operation since 1962. MYRRHA, a flexible fast spectrum research reactor is conceived as an accelerator driven system (ADS), able to operate in sub-critical and critical modes. It contains a proton accelerator of 600 MeV, a spallation target and a multiplying medium with MOX fuel, cooled by liquid lead-bismuth (Pb-Bi). Since February 2011, the Belgian Nuclear Research Centre has engaged in a 'pre-licensing' process with the regulatory authority for an estimated period up to mid 2014. The paper presents on the one hand the objectives of the pre-licensing phase as well as its implementation process and on the other hand, 2 implementing instruments which have been developed by the regulatory authority providing guidance to the designer of MYRRHA in order to meet the pre-licensing phase objectives. The first instrument is a strategic note for the design and operation of MYRRHA where as the second instrument is a guidance document for the format and content of a design options and provisions file (DOPF). Both instruments have been developed taking into account that MYRRHA is an irradiation facility using a Generation IV nuclear power system's type technology (liquid metal cooled fast neutron reactor). The strategic note overview aims to cover the safety approach as well as the security requirements and safeguards obligation applicable to MYRRHA. In particular, in the strategic note, a specific attention has been paid in order to ensure that a safety, security and safeguards integrated approach will drive the development of the MYRRHA design. The safety approach focuses on the safety goals and the minimum safety objectives set by the regulatory authority for this innovative design. The DOPF overview presents its objectives and structure resuming

  6. 7 CFR 6.28 - Transfer of license.

    Science.gov (United States)

    2010-01-01

    ... Licensing Authority will transfer to such other person the historical, nonhistorical or designated license... escrow with the sole condition for return of escrow being that the Licensing Authority determines that... to whom the historical licenses were issued during the quota year in which the sale or conveyance...

  7. NUHOMS modular spent-fuel storage system: Design, licensing and construction

    International Nuclear Information System (INIS)

    McLean, J.C.

    1990-08-01

    Carolina Power ampersand Light Company, the US Department of Energy, and the Electric Power Research Institute are participating in a cooperative program to demonstrate the NUHOMS (NUTECH Horizontal Modular Storage) System for storing spent nuclear fuel. This storage concept/design was developed by NUTECH Engineers, which is also participating in the project. The project involves the design, construction, and testing of three reinforced concrete storage modules and three stainless steel canisters at the H. B. Robinson Steam Electric Plant. Testing will focus on (1) the system's operating and fuel handling features, and (2) verification of the design basis of the thermal and shielding performance of the storage modules. As part of the project, NRC approval of the NUTECH Topical Report on NUHOMS has been obtained as well as issuance of a 10CFR Part 72 Materials License for the H. B. Robinson site. 6 refs., 13 figs., 22 tabs

  8. Nuclear licensing in Slovenia

    International Nuclear Information System (INIS)

    Prah, M.; Spiler, J.; Vojnovic, D.; Pristavec, M.

    1998-01-01

    The article presents the approach to nuclear licensing in Slovenia. The paper describes, the initialization, internal authorization and review process in the Krsko NPP. The overall process includes preparation, internal independent evaluation, the Krsko Operating Committee and the Krsko Safety Committee review and internal approval. In addition, the continuation of the licensing process is discussed which includes independent evaluation by an authorized institution and a regulatory body approval process. This regulatory body approval process includes official hearing of the licensee, communication with the licensee, and final issuance of a license amendment. The internal evaluation, which follows the methodology of US NRC (defined in 10 CFR 50.59 and NUMARC 125) is described. This concept is partially implemented in domestic legislation.(author)

  9. Quality assurance for nuclear power plants licensing aspect

    International Nuclear Information System (INIS)

    Borovoy, W.F.G.

    1976-02-01

    For the nuclear industry, specific criteria must be implemented to provide sufficient assurance that nuclear plants will be constructed and operated to conform with design, regulatory and code requirements. In Israel the inspections or audits are performed by the IAEC Licensing Division. Local position on ANSI QA standards as well as the eighteen criteria are shown. Lists of American standards are presented. The responsibility for quality assurance is not shared, but reinforced by each responsible unit in the supply chain. (B.G.)

  10. Advanced compiler design and implementation

    CERN Document Server

    Muchnick, Steven S

    1997-01-01

    From the Foreword by Susan L. Graham: This book takes on the challenges of contemporary languages and architectures, and prepares the reader for the new compiling problems that will inevitably arise in the future. The definitive book on advanced compiler design This comprehensive, up-to-date work examines advanced issues in the design and implementation of compilers for modern processors. Written for professionals and graduate students, the book guides readers in designing and implementing efficient structures for highly optimizing compilers for real-world languages. Covering advanced issues in fundamental areas of compiler design, this book discusses a wide array of possible code optimizations, determining the relative importance of optimizations, and selecting the most effective methods of implementation. * Lays the foundation for understanding the major issues of advanced compiler design * Treats optimization in-depth * Uses four case studies of commercial compiling suites to illustrate different approache...

  11. Licensing process of the digital application: Nuclear measurement analysis and control power range neutron monitor (NUMAC-PRNM) system for their implementation in the Laguna Verde NPP unit 2

    International Nuclear Information System (INIS)

    Ledesma-Carrion, R.; Hernandez-Cortes, A.

    1998-01-01

    This paper describe the licensing process performed by the Mexican Regulatory Commission (CNSNS) for the NUclear Measurement Analysis and Control-Power Range Neutron Monitor (NUMAC-PRNM) system, which sends trip signals to the Reactor Protection System (RPS), and has been implemented in the Laguna Verde Nuclear Power Plant Unit (LVNPP-U2) before its first fuel loading. The review and approval process was performed with the advise role of the United States of America Nuclear Regulatory Commission (USNRC): the regulatory frame applied includes the Code of Federal Regulation, some Regulatory Guides and some Industrial Standards. The evaluation covered topics related with the software, hardware and firmware specifications, design, tests, training, maintenance and operational experience. After the revision of these topics, the NUMAC-PRNM was approved through the CNSNS Safety Evaluation Report (SER) and then installed in the LVNPP-U2. This paper include a description of the regulatory requirements to this digital application, the safety concerns involved, the compliance to these requirements by the utility and the results of the CNSNS evaluation, mentioning the experience acquired during the process and the method used to perform the evaluation. Additionally, the interface between the designer-vendor, the utility and the regulatory body during the licensing process is commented. Finally, the conclusion is presented, taking into account the operational experience of the NUMAC applications implemented in the LVNPP. It also gives the future regulatory tasks related to the assessment of digital performance equipment and upgrades. (author)

  12. 10 CFR 51.97 - Final environmental impact statement-materials license.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Final environmental impact statement-materials license. 51...-Regulations Implementing Section 102(2) Final Environmental Impact Statements-Materials Licenses § 51.97 Final environmental impact statement—materials license. (a) Independent spent fuel storage installation (ISFSI...

  13. U.S. licensing process and ABWR certification

    International Nuclear Information System (INIS)

    Quirk, J.F.; Williams, W.A.

    1996-01-01

    Part 50 of Title 10 of the Code of Federal Regulation (CFR) establishes a two-step licensing process by which the U.S. Nuclear Regulatory Committee (NRC) authorizes nuclear reactor plant construction through issuance of a construction permit and authorizes operation by issuance of an operating license. At each stage, the NRC Staff conducts technical reviews and there is potential for public hearings. In 1989, the NRC issued a new, simplified licensing process: Part 52. The purpose of the Part 52 licensing process is to provide a regulatory framework that brings about earlier resolution of licensing issues. Because issues are not resolved early in the Part 50 licensing process, approval of an operating license is not assured until after a significant investment has been made in the plant. Part 52 increases the stability and certainty of the licensing process by providing for the early resolution of safety and environmental issues. The Part 52 licensing process features (1) early site permits, (2) design certification, and (3) combined construction permit and operating licenses. As part of the U.S. Advanced Light Water Reactor (ALWR) Program to revitalize the nuclear option through the integration of government/utility/industry efforts, GE undertook the role of applying for certification for its latest product line, the Advanced Boiling Water Reactor (ABWR), under the U.S. ABWR certification program. The ABWR design is an essentially complete plant. Initial application for design certification was in 1987 under Part 50. GE reapplied in late 1991 under the newly promulgated Part 52. Following seven years of intensive interactions with the NRC and ACRS, GE was awarded the first Final Design Approval (FDA) under Part 52. The Commission initiated rulemaking by publishing the proposed ABWR Certification Rule in the Federal Register in early 1995. Certification is anticipated mid-1996. (J.P.N.)

  14. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-07-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  15. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-05-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  16. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1983-01-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  17. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1983-03-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  18. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-11-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  19. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-10-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  20. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-08-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  1. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-09-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  2. Small modular reactors: current status, economic aspects and licensing

    International Nuclear Information System (INIS)

    Zimbron E, E.; Puente E, F.

    2014-10-01

    Interest for nuclear energy had resurgence since the beginning of the new century. This was a consequence of the new world conditions and needs: increasing energy demands (mainly from developing countries), awareness of the importance of energetic security and the necessity of limiting carbon emissions. In this nuclear boom, Small Modular Reactors (SMRs) develop and start to consolidate as a viable option for the present energy market. Their modular characteristics, lower initial capital cost, passive safety features and their niche applications, situate them as a technology with various advantages. The following study will present and analysis that will help to comprehend the SMRs present status. Information will show planned reactors, reactors in construction and in operation, advantages and challenges of their implementation, relevant economic aspects and important licensing factors that need to be highlighted. The analysis showed that the SMR technology is still in an initial stage that could reach and important development point in the next ten years. In this period, many of the reactors that are in design stage or that are through their licensing process might be constructed and could be getting ready for a commercial status. On the other hand, it has been observed that there are two main economic factors that need to be considered for any SMRs implementation project. First, the costs (initial, operation, maintenance, fuel and decommissioning) and second their possible niche market applications. Additionally, it has been noted that the licensing process is one of the greatest challenges for SMR general development. Licensing is mainly related to topic such as Emergency Planning Zone, first-of-a-kind engineering, passive safety features, proliferation resistance, multiple module designs and staffing. Previous information will serve as a base for carrying out a feasibility assessment analysis for SMR in Mexico. This part will be the last section of the project

  3. Small modular reactors: current status, economic aspects and licensing

    Energy Technology Data Exchange (ETDEWEB)

    Zimbron E, E. [Instituto Tecnologico de Estudios Superiores de Monterrey, Campus Santa Fe, Av. Carlos Lazo No. 100, Santa Fe, 01389 Mexico D. F. (Mexico); Puente E, F., E-mail: erick.zimbron@gmail.com [ININ, Direccion de Investigacion Cientifica, Carretera Mexico-Toluca s/n, 52750 Ocoyoacac, Estado de Mexico (Mexico)

    2014-10-15

    Interest for nuclear energy had resurgence since the beginning of the new century. This was a consequence of the new world conditions and needs: increasing energy demands (mainly from developing countries), awareness of the importance of energetic security and the necessity of limiting carbon emissions. In this nuclear boom, Small Modular Reactors (SMRs) develop and start to consolidate as a viable option for the present energy market. Their modular characteristics, lower initial capital cost, passive safety features and their niche applications, situate them as a technology with various advantages. The following study will present and analysis that will help to comprehend the SMRs present status. Information will show planned reactors, reactors in construction and in operation, advantages and challenges of their implementation, relevant economic aspects and important licensing factors that need to be highlighted. The analysis showed that the SMR technology is still in an initial stage that could reach and important development point in the next ten years. In this period, many of the reactors that are in design stage or that are through their licensing process might be constructed and could be getting ready for a commercial status. On the other hand, it has been observed that there are two main economic factors that need to be considered for any SMRs implementation project. First, the costs (initial, operation, maintenance, fuel and decommissioning) and second their possible niche market applications. Additionally, it has been noted that the licensing process is one of the greatest challenges for SMR general development. Licensing is mainly related to topic such as Emergency Planning Zone, first-of-a-kind engineering, passive safety features, proliferation resistance, multiple module designs and staffing. Previous information will serve as a base for carrying out a feasibility assessment analysis for SMR in Mexico. This part will be the last section of the project

  4. The licensing of shipping containers for radioactive materials

    International Nuclear Information System (INIS)

    Schulz-Forberg, B.

    1987-01-01

    In the Federal Republic of Germany the competent Federal Minister regulated the licensing procedure in a guideline while assigning the PTB the function of competent authority, and stipulating that BAM is to execute design inspection for approval. On completion of design inspection, BAM summarizes the results in a certificate which also states the measures required to be taken in quality monitoring in the manufacturing and maintenance of packagings. A sheet specifies the implemental provisions covering quality-assurance measures in planning, manufacturing, commissioning and operation of shipping items of types B(U) and B(M), and of nuclear safety classes I, II, and III. (orig./DG) [de

  5. Design and implementation of a cloud based lithography illumination pupil processing application

    Science.gov (United States)

    Zhang, Youbao; Ma, Xinghua; Zhu, Jing; Zhang, Fang; Huang, Huijie

    2017-02-01

    Pupil parameters are important parameters to evaluate the quality of lithography illumination system. In this paper, a cloud based full-featured pupil processing application is implemented. A web browser is used for the UI (User Interface), the websocket protocol and JSON format are used for the communication between the client and the server, and the computing part is implemented in the server side, where the application integrated a variety of high quality professional libraries, such as image processing libraries libvips and ImageMagic, automatic reporting system latex, etc., to support the program. The cloud based framework takes advantage of server's superior computing power and rich software collections, and the program could run anywhere there is a modern browser due to its web UI design. Compared to the traditional way of software operation model: purchased, licensed, shipped, downloaded, installed, maintained, and upgraded, the new cloud based approach, which is no installation, easy to use and maintenance, opens up a new way. Cloud based application probably is the future of the software development.

  6. 10 CFR 51.80 - Draft environmental impact statement-materials license.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Draft environmental impact statement-materials license. 51...-Regulations Implementing Section 102(2) Draft Environmental Impact Statements-Materials Licenses § 51.80 Draft environmental impact statement—materials license. (a) The NRC staff will either prepare a draft environmental...

  7. Status of safety issues at licensed power plants

    International Nuclear Information System (INIS)

    1991-05-01

    As part of ongoing US Nuclear Regulatory Commission (NRC) efforts to ensure the quality and accountability of safety issue information, a program has been established whereby an annual NUREG report will be published on the status of licensee implementation and NRC verification of safety issues in major NRC requirement areas. This report, the second volume of a three-volume series, addresses the status of unresolved safety issues (USIs) at licensed plants. The data contained in these NUREG reports are a product of the NRC's Safety Issues Management System (SIMS) database, which is maintained by the Project Management Staff in the Office of Nuclear Reactor Regulation and by NRC regional personnel. The purpose of this report is to provide a comprehensive description of the status of implementation and verification of the 27 safety issues designated as USIs and to make this information available to other interested parties, including the public. A corollary purpose of this NUREG report is to serve as a follow-on to NUREG-0933, ''A Prioritization of Generic Safety Issues,'' which tracks safety issues up until requirements are approved for imposition at licensed plants. 3 figs., 4 tabs

  8. AP1000R licensing and deployment in the United States

    International Nuclear Information System (INIS)

    Jordan, R. P.; Russ, P. A.; Filiak, P. P.; Castiglione, L. L.

    2012-01-01

    In recent years, both domestic and foreign utilities have turned to the standardized Westinghouse AP1000 plant design in satisfying their near - and long-term - sustainable energy needs. As direct support to these actions, licensing the AP1000 design has played a significant role by providing one of the fundamental bases in clearing regulatory hurdles leading to the start of new plant construction. Within the U.S. alone, Westinghouse AP1000 licensing activities have reached unprecedented milestones with the approvals of both AP1000 Design Certification and Southern Company's combined construction permit and operating license (COL) application directly supporting the construction of two new nuclear plants in Georgia. Further COL application approvals are immediately pending for an additional two AP1000 plants in South Carolina. And, across the U.S. nuclear industry spectrum, there are 10 other COL applications under regulatory review representing some 16 new plants at 10 sites. In total, these actions represent the first wave of new plant licensing under the regulatory approval process since 1978. Fundamental to the Nuclear Regulatory Commission's AP1000 Design Certification is the formal recognition of the AP1000 passive safety design through regulatory acceptance rulemaking. Through recognition and deployment of the AP1000 Design Certification, the utility licensee / operator of this reactor design are now offered an opportunity to use a simplified 'one-step' combined license process, thereby managing substantial back-end construction schedule risk from regulatory and intervention delays. Application of this regulatory philosophy represents both acceptance and encouragement of standardized reactor designs like the AP1000. With the recent AP1000 Design Certification and utility COL acceptances, the fundamental licensing processes of this philosophy have successfully proven the attainment of significant milestones with the next stage licensing actions directed

  9. License renewal demonstration program: NRC observations and lessons learned

    International Nuclear Information System (INIS)

    Prato, R.J.; Kuo, P.T.; Newberry, S.F.

    1996-12-01

    This report summarizes the Nuclear Regulatory Commission staff's observations and lessons learned from the five License Renewal Demonstration Program (LRDP) site visits performed by the staff from March 25, 1996, through August 16, 1996. The LRDP was a Nuclear Energy Institute (NEI) program intended to assess the effectiveness of the guidance provided by NEI 95-10, Revision 0, open-quotes Industry Guideline for Implementing the Requirements of 10 CFR Part 54 - The License Renewal Rule,close quotes to implement the requirements of Title 10 of the Code of Federal Regulations, Part 54 (10 CFR Part 54), open-quotes Requirements for Renewal of Operating Licenses for Nuclear Power Plants.close quotes In general, NEI 95-10 appeared to contain the basic guidance needed for scoping, screening, identifying aging effects, developing aging management programs, and performing time-limited aging analyses. However, inconsistent implementation of this guidance in some areas was an indication that clarification of existing guidance and/or the inclusion-of some new guidance may be needed for applicants to develop a license renewal program that is consistent with the intent of the rule

  10. Operator licensing examiner standards

    International Nuclear Information System (INIS)

    1994-06-01

    The Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining licensees and applicants for reactor operator and senior reactor operator licenses at power reactor facilities pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). The Examiner Standards are intended to assist NRC examiners and facility licensees to better understand the initial and requalification examination processes and to ensure the equitable and consistent administration of examinations to all applicants. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator licensing policy changes. Revision 7 was published in January 1993 and became effective in August 1993. Supplement 1 is being issued primarily to implement administrative changes to the requalification examination program resulting from the amendment to 10 CFR 55 that eliminated the requirement for every licensed operator to pass an NRC-conducted requalification examination as a condition for license renewal. The supplement does not substantially alter either the initial or requalification examination processes and will become effective 30 days after its publication is noticed in the Federal Register. The corporate notification letters issued after the effective date will provide facility licensees with at least 90 days notice that the examinations will be administered in accordance with the revised procedures

  11. Licensing experience of the HTR-10 test reactor

    International Nuclear Information System (INIS)

    Sun, Y.; Xu, Y.

    1996-01-01

    A 10MW high temperature gas-cooled test reactor (HTR-10) is now being projected by the Institute of Nuclear Energy Technology within China's National High Technology Programme. The Construction Permit of HTR-10 was issued by the Chinese nuclear licensing authority around the end of 1994 after a period of about one year of safety review of the reactor design. HTR-10 is the first high temperature gas-cooled reactor (HTGR) to be constructed in China. The purpose of this test reactor project is to test and demonstrate the technology and safety features of the advanced modular high temperature reactor design. The reactor uses spherical fuel elements with coated fuel particles. The reactor unit and the steam generator unit are arranged in a ''side-by-side'' way. Maximum fuel temperature under the accident condition of a complete loss of coolant is limited to values much lower than the safety limit set for the fuel element. Since the philosophy of the technical and safety design of HTR-10 comes from the high temperature modular reactor design, the reactor is also called the Test Module. HTR-10 represents among others also a licensing challenge. On the one side, it is the first helium reactor in China, and there are less licensing experiences both for the regulator and for the designer. On the other side, the reactor design incorporates many advanced design features in the direction of passive or inherent safety, and it is presently a world-wide issue how to treat properly the passive or inherent safety design features in the licensing safety review. In this presentation, the licensing criteria of HTR-10 are discussed. The organization and activities of the safety review for the construction permit licensing are described. Some of the main safety issues in the licensing procedure are addressed. Among these are, for example, fuel element behaviour, source term, safety classification of systems and components, containment design. The licensing experiences of HTR-10 are of

  12. Licensing process in Finland

    International Nuclear Information System (INIS)

    Tiippana, Petteri

    2011-01-01

    In accordance with the Nuclear Energy Act, the use of nuclear energy constitutes operations subject to license. The licensing process and conditions for granting a license is defined in the legislation. The licenses are applied from and granted by the Government. This paper discusses briefly the licensing process in Finland and also the roles and responsibilities of main stakeholders in licensing. Licensing of a nuclear power plant in Finland has three steps. The first step is the Decision in Principle (DiP). Goal of DiP is to decide whether using nuclear power is for the overall good for the Finnish society. The second step is Construction License (CL) and the goal of CL phase is to determine whether the design of the proposed plant is safe and that the participating organisations are capable of constructing the plant to meet safety goals. The third step is the Operating License (OL) and the goal of the OL phase is to determine whether the plant operates safely and licensee is capable to operate the plant safely. Main stakeholders in the licensing process in Finland are the utility (licensee) interested in using nuclear power in Finland, Ministry of Employment and the Economy (MEE), Government, Parliament, STUK, the municipality siting the plant and the general public. Government grants all licenses, and Parliament has to ratify Government's Decision in Principle. STUK has to assess the safety of the license applications in each step and give statement to the Ministry. Municipality has to agree to site the plant. Both STUK and the municipality have a veto right in the licensing process

  13. NUMARC view of license renewal criteria

    International Nuclear Information System (INIS)

    Edwards, D.W.

    1989-01-01

    The Atomic Energy Act and the implementing regulations of the US Nuclear Regulatory Commission (NRC) permit the renewal of nuclear plant operating licenses upon expiration of their 40-year license term. However, the regulatory process by which license renewal may be accomplished and the requirements for the scope and content of renewal applications are yet to be established. On August 29, 1988, the NRC published an Advanced Notice of Proposed Rulemaking regarding the subject of license renewal. This Advanced Notice and the NUREG which it references, NUREG-1317, Regulatory Options for Nuclear Plant License Renewal, provide the most recent regulatory thought on this issue. The basic issue addressed by NUREG-1317 is the definition of an adequate licensing basis for the renewal of a plant license. The report contemplates three alternatives in this regard. This paper discusses each of these three proposals. The NUMARC NUPLEX Working Group endorses a license renewal process based on a plant's current licensing basis along with an evaluation of the pertinent components, systems, and structures affected by age-related degradation. The NUMARC NUPLEX Working group believes that an appropriate scope for NRC review of the license renewal application should focus on those safety-significant structures systems, and components subject to significant age-related degradation that are not subject to existing recognized effective replacement, refurbishment, or inspection programs. The paper also briefly discusses NUMARC's view of the role of the Backfit Rule in the license renewal process

  14. License renewal process

    International Nuclear Information System (INIS)

    Fable, D.; Prah, M.; Vrankic, K.; Lebegner, J.

    2004-01-01

    The purpose of this paper is to provide information about license renewal process, as defined by Nuclear Regulatory Commission (NRC). The Atomic Energy Act and NRC regulations limit commercial power reactor licenses to an initial 40 years but also permit such licenses to be renewed. This original 40-year term for reactor licenses was based on economic and antitrust considerations not on limitations of nuclear technology. Due to this selected time period; however, some structures and components may have been engineered on the basis of an expected 40-year service life. The NRC has established a timely license renewal process and clear requirements codified in 10 CFR Part 51 and 10 CFR Part 54, that are needed to assure safe plant operation for extended plant life. The timely renewal of licenses for an additional 20 years, where appropriate to renew them, may be important to ensuring an adequate energy supply during the first half of the 21st Century. License renewal rests on the determination that currently operating plants continue to maintain adequate levels of safety, and over the plant's life, this level has been enhanced through maintenance of the licensing bases, with appropriate adjustments to address new information from industry operating experience. Additionally, NRC activities have provided ongoing assurance that the licensing bases will continue to provide an acceptable level of safety. This paper provides additional discussion of license renewal costs, as one of key elements in evaluation of license renewal justifiability. Including structure of costs, approximately value and two different approaches, conservative and typical. Current status and position of Nuclear Power Plant Krsko, related to license renewal process, will be briefly presented in this paper. NPP Krsko is designed based on NRC Regulations, so requirements from 10 CFR 51, and 10 CFR 54, are applicable to NPP Krsko, as well. Finally, this paper will give an overview of current status of

  15. NPP long term operation in Spain - First application for license renewal

    International Nuclear Information System (INIS)

    Francia, L.; Gorrochategui, I.; Marcos, R.

    2007-01-01

    Full text: In the operation of the Spanish nuclear power plants (NPP), safety is always the prime consideration. Plant Life Management Programmes have been set up with the strategic objective to operate the NPPs as long as they are considered safe and reliable. The safety of each NPP is reviewed by the Spanish nuclear regulatory authority (CSN) under a continuous process. In addition, experience is gained from operating the plants and from exchanges with operators of similar units. Current Spanish regulatory framework for renewing NPP operating licenses requires performing a Periodic Safety Review (PSR) to be performed every 10 years and submitted when applying for a new renewal of the NPP operating license. A few years ago, CSN issued a document regarding the licensing requirements that nuclear power plants should meet in order to be granted with an operating license for long term operation (i.e, operation beyond the original plant design life, typically 40 years). Besides the traditional PSR requirements, specific requirements regarding to long term operation (LTO) include: - An Aging Management and Evaluation Program, including the identification and evaluation of Time Limited Aging Analysis (TLAA). - An updated Radiological Impact Study. - A review and assessment of regulation/standard applicability. Garona NPP (GE, BWR/3 design) operated by Spanish utility Nuclenor from 1971 has a current operating license up to 2009. A decision was made to apply for a new operating license, being Garona plant the first one in Spain to face with the new long term operation requirements. The paper will provide an overview of the methodology used in Spain to address and perform the required analyses to support the LTO application for the operating license renewal. In particular, focus will be paid on the project developed in Garona (2002-2006) whose result has been the first Spanish application for License Renewal for LTO. Also it will be reported the ongoing work necessary to

  16. Implementing a Generative Urban Design Model : Grammar-based design patterns for urban design

    NARCIS (Netherlands)

    Beirao, J.N.; Mendes, G.; Duarte, J.; Stouffs, R.M.F.

    2010-01-01

    This paper shows the first results of a prototype implementation of a generative urban design tool. This implementation will form part of a design support tool for a GIS based platform defined to formulate, generate and evaluate urban designs. These three goals, formulation, generation and

  17. Summary report on safety and licensing strategy support for the ABR prototype

    International Nuclear Information System (INIS)

    Cahalan, J. E.; Nuclear Engineering Division

    2007-01-01

    Argonne National Laboratory is providing support to the US Department of Energy in the Global Nuclear Energy Partnership (GNEP) in certification of an advanced, sodium-cooled fast reactor. The reactor is to be constructed as a prototype for future commercial power reactors that will produce electricity while consuming actinides recovered from light water reactor spent fuel. This prototype reactor has been called the Advanced Burner Reactor, or ABR, and is now often referred to as the advanced recycle reactor. As part of its activities, Argonne is providing technical services to assist definition of a safety and licensing strategy for the ABR prototype, and to further implementation of the strategy. In FY06, an organizational meeting was held for DOE and its laboratory contractors to discuss licensing alternatives and review previous licensing experience for the Fast Flux Test Facility (FFTF) and the Clinch River Breeder Reactor Plant (CRBRP). Near the end of FY06, a report summarizing the discussions and conclusions was written. One of the top-level conclusions recorded in the report was a recommendation to follow a licensing strategy that included the US Nuclear Regulatory Commission (NRC) as the regulatory review and licensing authority. In FY07, activities ar Argonne to support safety and licensing progress have continued. These activities have focused on further evaluation of licensing alternatives; assessment of design, analysis, and documentation implications of licensing paths; and initial technical interactions with the Nuclear Regulatory Commission. This report summarizes FY07 activities

  18. Sensor network based vehicle classification and license plate identification system

    Energy Technology Data Exchange (ETDEWEB)

    Frigo, Janette Rose [Los Alamos National Laboratory; Brennan, Sean M [Los Alamos National Laboratory; Rosten, Edward J [Los Alamos National Laboratory; Raby, Eric Y [Los Alamos National Laboratory; Kulathumani, Vinod K [WEST VIRGINIA UNIV.

    2009-01-01

    Typically, for energy efficiency and scalability purposes, sensor networks have been used in the context of environmental and traffic monitoring applications in which operations at the sensor level are not computationally intensive. But increasingly, sensor network applications require data and compute intensive sensors such video cameras and microphones. In this paper, we describe the design and implementation of two such systems: a vehicle classifier based on acoustic signals and a license plate identification system using a camera. The systems are implemented in an energy-efficient manner to the extent possible using commercially available hardware, the Mica motes and the Stargate platform. Our experience in designing these systems leads us to consider an alternate more flexible, modular, low-power mote architecture that uses a combination of FPGAs, specialized embedded processing units and sensor data acquisition systems.

  19. The Design Options and Provision File and the Role of Defence in Depth Within the Pre-Licensing of the MYRRHA Project

    Energy Technology Data Exchange (ETDEWEB)

    Fiorini, G. L.; Hakimi, N., E-mail: Gian-Luigi.fiorini@fanc.fgov.be [FANC (Belgium); Tombuyses, B.; Dams, C.; Wertelaers, A.; Schrauben, M.; Dresselaers, R. [Federal Agency for Nuclear Control (FANC), Bruxelles (Belgium)

    2014-10-15

    The Belgian Federal Agency for Nuclear Control (FANC) is engaged in a process of pre-licensing for the experimental reactor MYRRHA. The regulatory framework applicable for the implementation of the MYRRHA project and the expected safety, security and safeguards philosophy are described by FANC in a Strategic Note. This document presents a logical flow chart which defines the steps required to design a basic nuclear installation and ensure compliance with the requirements of nuclear safety, security and safeguards. Using this flow chart, the content of a set of volumes (Design Options and Provision File - DOPF) is defined; the DOPF will serve as a basis for the evaluation of the concept with the acceptability of the selected design options. Defence in depth (DiD) and its fundamental principles remain the foundation of the whole process. The paper summarizes the contents of the Strategic Note and the DOPF and focuses more specifically on aspects relating to changes in the concept of defence in depth and on practices for their integration in the process of design / assessment of the MYRRHA reactor. (author)

  20. AREVA solutions to licensing challenges in PWR and BWR reload and safety analysis

    Energy Technology Data Exchange (ETDEWEB)

    Curca-Tivig, Florin [AREVA GmbH, Erlangen (Germany)

    2016-05-15

    Regulatory requirements for reload and safety analyses are evolving: new safety criteria, request for enlarged qualification databases, statistical applications, uncertainty propagation.. In order to address these challenges and access more predictable licensing processes, AVERA is implementing consistent code and methodology suites for PWR and BWR core design and safety analysis, based on first principles modeling and extremely broad verification and validation data base. Thanks to the high computational power increase in the last decades methods' development and application now include new capabilities. An overview of the main AREVA codes and methods developments is given covering PWR and BWR applications in different licensing environments.

  1. Guideline for the licensing of various designs of ionisation smoke alarms

    International Nuclear Information System (INIS)

    1978-01-01

    The purpose of the guideline is to set up criteria for the construction licensing of ionisation smoke alarms and to determine their use. This guarantees that only those ISA are licensed which correspond to the level of science and technology and that the ISA to be licensed fulfills the demands of radiation protection. The recommendations of OECD/NEA are also born in mind. (orig./HP) [de

  2. Resolving the issues arisen during the development of License Renewal Application at PAKS NPP

    International Nuclear Information System (INIS)

    Ratkai, Sandor; Katona, Tamas Janos

    2012-01-01

    Operational license of the four VVER-440/213 units at Paks NPP, Hungary is limited to the design lifetime of 30 years. Extension by an additional 20 years of the original license is one of the main goals of the plant owner. In 2008 a programme for long-term operation (LTO) was developed and submitted to the Hungarian Atomic Energy Authority. The LTO Programme defines the activities for ensuring the extension of the operational lifetime and contains the justification of the safe LTO. The LTO Programme has to be implemented and comprehensive justification of the safe LTO has to be provided in the formal License Renewal Applications unit by unit. This work has been completed by the end of 2011, and the application has been submitted for approval for the Unit 1. The authority review and the approval of the License Renewal Application for Unit 1 should be finished before the expiration of the original design lifetime in 2012. In line with the regulations and supporting the License Renewal Application, a large number of engineering tasks have been performed. In this paper the entire project will be reported. The issues will be discussed, which have been arisen during the development of the application. The difficulties caused by the Hungarian technical and regulatory peculiarities will be presented. (author)

  3. Looking at the licensability of System 80+ in the UK

    International Nuclear Information System (INIS)

    Molnar, C.M.

    1993-01-01

    There are today no internationally-sanctioned nuclear power plant design or licensing guidelines, or acceptance criteria, available for a standard plant design that would have multi-national regulatory acceptability. On the contrary, a diversity of national regulations govern the design and licensing of nuclear power stations around the world. When licensing a nuclear facility in this environment, it is important for all parties (utility, designer and regulator) to recognise consciously that there are numerous solutions available to satisfy varying safety requirements. There is no one right-way - there are only trade-offs justified on safety, performance benefit and cost, which, taken together, fashion designs that conform to national licensing requirements. (Author)

  4. Designing and Implementing Performance Technology for Teachers

    Directory of Open Access Journals (Sweden)

    Joi L. Moore

    2004-06-01

    Full Text Available This paper synthesizes research findings from a performance analysis of teacher tasks and the implementation of performance technology. These findings are aligned with design and implementation theories to provide understanding of the complex factors and events that occur during the implementation process. The article describes the necessary elements and conditions for designing and implementing performance tools in school environments that will encourage usage, efficient performance, and positive attitudes. Two models provide a visual representation of causal relationships between the implementation factors and the technology user. Although the implementation process can become complex because of the simultaneous events and phases, it can be properly managed through good communication and strategic involvement of teachers during the design and development process. The models may be able to assist technology designers and advocates with presenting innovations to teachers who are frequently asked to try technical solutions for performance support or improvement.

  5. Licensing decisions and safety research related to LMFBR accidents

    International Nuclear Information System (INIS)

    Denise, R.P.; Speis, T.P.; Kelber, C.N.; Curtis, R.T.

    1977-01-01

    The licensing approach which ensures adequate protection of the public health and safety against serious accidents is described. This paper describes the role of core melt and core disruptive accidents in the design, safety research, and licensing processes, using the Clinch River Breeder Reactor (CRBR) as a focal point. Major design attention is placed on the prevention of these accidents so that the probability of core melt accidents is reduced to a sufficiently low level that they are not treated as design basis accidents. Additional requirements are placed upon the design to further reduce residual risk. This licensing process is supported by a confirmatory research program designed to provide an independent basis for licensing judgements. It has as a goal the resolution of generic safety issues prior to the establishment of a commercial LMFBR industry. The program includes accident analysis, experiments in materials interactions, aerosol transport and system integrity and planning for new safety test facilities. The problems are approached in a multi-disciplinary functional manner that identifies key safety issues and centralizes efforts to resolve them. The near term objectives of the program support the licensing of the Clinch River Breeder Reactor (CRBR) and the proposed Prototype Large Breeder Reactor (PLBR). The long term objectives of the program support the licensing of commercial LMFBRs during the late 1980's and beyond. This safety research is designed to provide an independent basis for the licensing judgements which must be made by the Nuclear Regulatory Commission

  6. The Reactor Analysis Support Package (RASP): Volume 10, Guidelines for developing a reload licensing capability:Final report

    International Nuclear Information System (INIS)

    Diamond, D.J.

    1988-08-01

    The EPRI Reactor Analysis Support Package (RASP) consists of computer codes and documentation for calculating core performance and plant transients. This report was written to help a utility to use these tools properly for reload design and safety evaluations. The emphasis is on the steps that the utility can take to develop a methodology that is approved by the Nuclear Regulatory Commission for reload licensing submittals. The report treats both the planning and the implementation of this type of calculational capability. With regard to planning, there is discussion defining objectives, resource requirements, organization and scheduling. In order to help the engineering staff implement the plan there is discussion of the development of a methodology for event analysis, qualification of the methods, and the writing of design control procedures and topical reports. The experience of utilities, and especially of GPU Nuclear Corporation (GPUN), in developing a reload licensing capability is cited throughout the report and extracts from GPUN design control procedures are included in the appendices. 16 refs., 23 figs., 9 tabs

  7. Establishment of the international collaboration and licensing preparation planning for the specific design of a prototype SFR

    International Nuclear Information System (INIS)

    Kim, Y. G.; Joo, H. K.; Cho, C. H.; Yoo, J. W.; Lee, D. U.; Ahn, K. S.; Hwang, Y. S.

    2013-05-01

    The conceptual design of prototype of Gen IV SFR (PGSFR) will be early determined through the review of the international experts. After this, the technology demonstration plan and validation of fuel design will be determined in more detail. The project will be accomplished efficiently by introducing the proven technology already validated from the international collaboration. The conceptual design and its requirements of PGSFR will be reviewed by ANL, who has a lot of design experiences in the metal fueled SFR development. The collaboration with ANL has been done through Work For Others (WFO) contract, and the MOU was signed between SFRA and Terra Power(USA), and SFRA and IGCAR. The licensing issues raised during PFBR and FBTR licensing in India will be discussed and reflected into the PGSFR design by inviting the high level expert from India, for example Dr. Chetal in IGCAR. The specific design, technology validation plan and fuel development plan will be established in more detail through the annual International Technical Review Meeting (ITRM) and experimental facilities available from the international institute and companies, which will be the basis for shortening the project period and to reduce the development cost

  8. Nuclear licensing and supervision in Germany

    International Nuclear Information System (INIS)

    1996-06-01

    The legal instrument for implementing the licensing and supervisory procedure is specified by statutory ordinances, guidelines and provisions. The licensing requirements for nuclear power plants on the final storage of radioactive wastes in the federal republic of germany are described. The nuclear facilities are subject to continuous state supervision after they have been granted. The appendix gives a brief account of the most important ordinances relating to the AtG and extracts from the Nuclear Safety Convention. (HP)

  9. Designing and implementing an undergraduate health administration program for nontraditional students.

    Science.gov (United States)

    Borkowski, Nancy; Gordon, Jean; Rushing, John

    2005-01-01

    This paper describes the development and implementation of an undergraduate health administration program for nontraditional students at a Hispanic serving institution. The program had to meet the needs of a diverse, adult student population, the local community, and the future leadership requirements of the healthcare industry. As such, the program was designed as a "bridge" for full-time employed healthcare licensed professionals seeking to complete a baccalaureate degree and obtain positions in the healthcare management field. It answered the call of the local community to strengthen partnerships between business and education by offering the program at healthcare employer worksites. Furthermore, the program addressed three needs of the healthcare industry: (1) the recognized shortage of future healthcare leaders, (2) the under-representation of minorities in the industry, and (3) proposed changes in health administration programs' curricula to focus on competencies in the areas of communication skills, decision making, ethical leadership, and self-development.

  10. Systems engineering and the licensing of Small Modular Reactors

    Energy Technology Data Exchange (ETDEWEB)

    Kulesa, T., E-mail: tkulesa@us.ibm.com [IBM, Philidelphia, Pennsylvania (United States); Soderholm, K., E-mail: Kristiina.Soderholm@fortum.com [Fortum Power (Finland); Fechtelkotter, P., E-mail: pfech@us.ibm.com [IBM, Boston, Massacheusets (United States)

    2014-07-01

    Both global warming and the need for dependable sources of energy continue to make nuclear power generation an appealing option. But a history of cost overruns, project delays, and environmental disaster has pushed the industry to innovate and design a more flexible, scalable, and safe source of nuclear energy - the small modular reactor. Innovation in generation technology creates disruption in already complex licensing and regulatory processes. This paper discusses how the application of systems engineering and requirements management can help combat confusion, rework, and efficiency problems across the engineering and compliance life cycle. The paper is based on the PhD Dissertation 'Licensing Model Development for Small Modular Reactors (SMRs) - Focusing on Finnish Regulatory Framework', approved in 2013. The result of the study gives recommendations and tools to develop and optimize the licensing process for SMRs. The most important SMR-specific feature, in terms of licensing, is the modularity of the design. Here the modularity indicates multi-module SMR designs, which creates new challenges in the licensing process. Another feature impacting licensing feasibility is the plan to build many standardized power plants in series and use factory-fabricated modules to optimize the construction costs. SMR licensing challenges are under discussion in many international forums, such as World Nuclear Association Cooperation in Reactor Design Evaluation and Licensing Small Modular Reactor group (WNA CORDEL SMR) group and IAEA INPRO regulators' forum. This paper also presents an application of the new licensing process using Systems Engineering, Requirements Management, and Project Management practices and tools. (author)

  11. Systems engineering and the licensing of Small Modular Reactors

    International Nuclear Information System (INIS)

    Kulesa, T.; Soderholm, K.; Fechtelkotter, P.

    2014-01-01

    Both global warming and the need for dependable sources of energy continue to make nuclear power generation an appealing option. But a history of cost overruns, project delays, and environmental disaster has pushed the industry to innovate and design a more flexible, scalable, and safe source of nuclear energy - the small modular reactor. Innovation in generation technology creates disruption in already complex licensing and regulatory processes. This paper discusses how the application of systems engineering and requirements management can help combat confusion, rework, and efficiency problems across the engineering and compliance life cycle. The paper is based on the PhD Dissertation 'Licensing Model Development for Small Modular Reactors (SMRs) - Focusing on Finnish Regulatory Framework', approved in 2013. The result of the study gives recommendations and tools to develop and optimize the licensing process for SMRs. The most important SMR-specific feature, in terms of licensing, is the modularity of the design. Here the modularity indicates multi-module SMR designs, which creates new challenges in the licensing process. Another feature impacting licensing feasibility is the plan to build many standardized power plants in series and use factory-fabricated modules to optimize the construction costs. SMR licensing challenges are under discussion in many international forums, such as World Nuclear Association Cooperation in Reactor Design Evaluation and Licensing Small Modular Reactor group (WNA CORDEL SMR) group and IAEA INPRO regulators' forum. This paper also presents an application of the new licensing process using Systems Engineering, Requirements Management, and Project Management practices and tools. (author)

  12. Technical regulations on the general design and safety criteria for design and construction of nuclear reactors of May 1975

    International Nuclear Information System (INIS)

    1975-05-01

    These Technical Regulations published on 5th September 1975 were made in implementation of Section 33 of Decree No 7/9141 on the procedure for the licensing of nuclear installations. They serve as a guide to licensing authorities, project designers and operators in the nuclear field and therefore provide general criteria for safety standards, engineering codes, siting considerations, design bases for overall environmental radiation protection, and also deal with reactor core design, instrumentation, control, alarm systems, including an emergency core cooling system. Finally, the safe design of fuel elements must be ensured and fuel storage and handling techniques complied with. (NEA) [fr

  13. Licensing Support System: Preliminary data scope analysis

    International Nuclear Information System (INIS)

    1989-01-01

    The purpose of this analysis is to determine the content and scope of the Licensing Support System (LSS) data base. Both user needs and currently available data bases that, at least in part, address those needs have been analyzed. This analysis, together with the Preliminary Needs Analysis (DOE, 1988d) is a first effort under the LSS Design and Implementation Contract toward developing a sound requirements foundation for subsequent design work. These reports are preliminary. Further refinements must be made before requirements can be specified in sufficient detail to provide a basis for suitably specific system specifications. This document provides a baseline for what is known at this time. Additional analyses, currently being conducted, will provide more precise information on the content and scope of the LSS data base. 23 refs., 4 figs., 8 tabs

  14. AP1000{sup R} licensing and deployment in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Jordan, R. P.; Russ, P. A.; Filiak, P. P.; Castiglione, L. L. [Westinghouse Electric Company LLC, 1000 Westinghouse Drive, Cranberry Township, PA 16066 (United States)

    2012-07-01

    In recent years, both domestic and foreign utilities have turned to the standardized Westinghouse AP1000 plant design in satisfying their near - and long-term - sustainable energy needs. As direct support to these actions, licensing the AP1000 design has played a significant role by providing one of the fundamental bases in clearing regulatory hurdles leading to the start of new plant construction. Within the U.S. alone, Westinghouse AP1000 licensing activities have reached unprecedented milestones with the approvals of both AP1000 Design Certification and Southern Company's combined construction permit and operating license (COL) application directly supporting the construction of two new nuclear plants in Georgia. Further COL application approvals are immediately pending for an additional two AP1000 plants in South Carolina. And, across the U.S. nuclear industry spectrum, there are 10 other COL applications under regulatory review representing some 16 new plants at 10 sites. In total, these actions represent the first wave of new plant licensing under the regulatory approval process since 1978. Fundamental to the Nuclear Regulatory Commission's AP1000 Design Certification is the formal recognition of the AP1000 passive safety design through regulatory acceptance rulemaking. Through recognition and deployment of the AP1000 Design Certification, the utility licensee / operator of this reactor design are now offered an opportunity to use a simplified 'one-step' combined license process, thereby managing substantial back-end construction schedule risk from regulatory and intervention delays. Application of this regulatory philosophy represents both acceptance and encouragement of standardized reactor designs like the AP1000. With the recent AP1000 Design Certification and utility COL acceptances, the fundamental licensing processes of this philosophy have successfully proven the attainment of significant milestones with the next stage licensing

  15. Advances and Challenges in the Implementation of DiD in Siting, Design, and Construction of Nuclear Installations in Vietnam

    Energy Technology Data Exchange (ETDEWEB)

    Nguyen, H.A., E-mail: nhanh@varans.vn [Vietnam Agency for Radiation and Nuclear Safety, Hanoi (Viet Nam)

    2014-10-15

    Vietnam is embarking on a development of a nuclear power program. The main focus is now on the initial 1000 MWe x 2 units of the nuclear power plant in Ninh Thuan province. Now, the nuclear projects of Vietnam are in the phase of siting approval and investment projects approval. The design assessment will be performed in 2013-2014; the construction and installation will be performed from now until the operating licensing is obtained in 2020-2021. With state of development of a nuclear power program in Vietnam, this paper only focuses on advances and challenges in the implementation of Defence in Depth (DID) in siting, design, and construction of nuclear installations in Vietnam. (author)

  16. Design and Implementation of Open-Access Web-Based Education ...

    African Journals Online (AJOL)

    ... is not flexible as it does not permit access to educational resource at any time or place feasible. ... In this paper, a web-based education useful for e-learning was designed and ... using an open source platform which will be more flexible, and cost effective due to free licensing. The programming languages used are. VB.

  17. CANFLEX-NU fuel licensing status and issues in Korea

    International Nuclear Information System (INIS)

    Geun-Sun Auh; Jun-Sang Park; Sweng-Woong Woo; Yong-Ho Ryu

    1999-01-01

    The CANFLEX-NU Fuel Design Report (FDR) for Wolsung 1,2,3,4 was submitted for licensing review in July 1996. The FDR contains sections of fuel rod design, fuel bundle design, nuclear design and thermal-hydraulic design. Each section describes the design bases, design methodology and design evaluation results showing that the design bases are met. The CANFLEX-NU fuel design is not finalized yet in Korean licensing point of view. For example, among others, new Xc-BL correlation is needed to be developed, fuel rod gap reduction effect is to be considered in the Critical Heat Flux, more information for power ramp defect of fuel rod especially in the end-cap weld region is needed in the fuel rod design, and enough data are not available in irradiated conditions in the fuel rod and bundle designs. The specific detailed technical licensing issues and their backgrounds are explained for the CANFLEX-NU FDR in Korea. The Korean nuclear regulation environment is changing due to the Korean government policy of overall regulation reduction. The contents and timetables of Korean nuclear regulation changes are also explained for new fuel licensing. (author)

  18. RM - ODP to express nuclear licensing

    International Nuclear Information System (INIS)

    Barbosa, E.A.; Martucci, M. Jr.

    2002-01-01

    The scope of CNEN (Comissao Nacional de Energia Nuclear) is established by standards and procedures, which allow one context where several activities for nuclear licensing are realized by persons, machines and other entities of real world and by software systems. The CNEN objectives for licensing nuclear installations can be specified and they define how the systems are consisted, its nature, and which important elements were considered relevant for its constitution. The behavior, where the software will be operated, was likely defined in this paper through all aspects of its business process, which means from its licensing context. The concepts and definition showed here defined one specifics business domain, through ODP context. The functionalities of nuclear licensing process, the relationship scope and the rules of interaction that contributed for to specify the nuclear licensing process were defined, too. Therefore, the definition of the domain follows the orientation of architecture concepts and allows to implement the reflection model, where, with the auxiliary from IDEF0 (Integration Definition for Function Modeling) diagrams, the interactions between extern domains were mapped

  19. Iterative Prototyping of Strategy Implementation Workshop Design

    DEFF Research Database (Denmark)

    Kryger, Anders

    2018-01-01

    Purpose: The purpose of this paper is to demonstrate how a strategy implementation workshop design can be developed and tested while minimizing the time spent on developing the design. Design/methodology/approach: This multiple case study at a diesel engine company shows how iterative prototyping...... can be used to structure the design process of a strategy implementation workshop. Findings: Strategy implementation workshop design can be developed in resource-constrained environments through iterative prototyping of the workshop design. Each workshop iteration can generate value in its own right...... draw on his/her experience as well as add to his/her knowledge base. Originality/value: Introducing iterative prototyping in an organizational context can facilitate fast yet structured development of a rigorous workshop design. Strategy consultants are provided with empirical examples of how...

  20. Trends in CANDU licensing

    International Nuclear Information System (INIS)

    Snell, V.G.; Grant, S.D.

    1997-01-01

    Modern utilities view nuclear power more and more as a commodity - it must compete 'today' with current alternatives to attract their investment. With its long construction times and large capital investment, nuclear plants are vulnerable to delays once they have been committed. There are two related issues. Where the purchaser and the regulator are experienced in CANDU, the thrust is a very practical one: to identify and resolve major licensing risks at a very early stage in the project. Thus for a Canadian project, the designer (AECL) and the prospective purchaser would deal directly with the AECB. However CANDU has also been successfully licensed in other countries, including Korea, Romania, Argentina, India and Pakistan. Each of these countries has its own regulatory agency responsible for licensing the plant. In addition, however, the foreign customer and regulator may seek input from the AECB, up to and including a statement of licensability in Canada; this is not normally needed for a ''repeat'' plant and/or if the customer is experienced in CANDU, but can be requested if the plant configuration has been modified significantly from an already-operating CANDU. It is thus the responsibility of the designer to initiate early discussions with the AECB so the foreign CANDU meets the expectations of its customers

  1. Licensing of nuclear power plants, immediate implementation, constitutional appeal

    International Nuclear Information System (INIS)

    Winters, K.P.

    1980-01-01

    The decision relates to part of the licensing procedure of the Muelheim-Kaerlich Nuclear Power Station. The subject of the complaint of unconstitutionality is the immediate execution of the 7th clearance within the framework of the 1st partial permit, which had been confined by the Rhineland-Palatinate Higher Administrative Court in a decision of May 2, 1977 (DVBl. 1977, p. 730). The Federal Constitutional Court regards the complaint of unconstitutionality as being unfounded. The court expresses itself especially on the assessment, under consnitutional aspects, of the material rules and rules of procedure pertaining to the licensing of nuclear power plants and of major changes in such plants. Moreover, the dissenting opinions of Justices Dr. Simon and Professor Heussner are quoted in excerpts. The comment by K.- P. Winters regards as the nucleus of the decision and of the dissenting vote the statements about the guarantee functions procedural rules have in ensuring effective protection of human rights. In his view, these statements of constitutional law are of fundamental significance for problems of atomic law and radiation protection law. (HSCH) [de

  2. Outline for embedded topical license renewal industry perspective

    International Nuclear Information System (INIS)

    Gilchrist, Jacqueline

    1991-01-01

    This presentation describes the history of the project, selection of the Lead plant; project management, and project implementation, License renewal application contains: implementation plan; technical specifications and program changes; updated safety analysis report supplement; plant specific exemptions; environmental report update

  3. Licensing of ''grandfather's'' facilities: Ukrainian experience

    International Nuclear Information System (INIS)

    Mikolaitchouk, H.; Bogdan, L.; Steinberg, N.

    1995-01-01

    In the former USSR, unlike most countries, radioactive waste management activities including waste disposal needed no license. But after the USSR breakdown the Ukrainian Parliament -- Verkhovna Rada -- invoked the revised Law on Business activities. According to Article 4 of the Law, in order to treat or to dispose radioactive waste every enterprise has to get a special permission or license. In compliance with the Law, the Cabinet of Ministers by its Ordinance of January 13, 1993, authorized the Ukrainian State Committee for Nuclear and Radiation Safety (UkrSCNRS) to issue special permissions or licenses for waste treatment and disposal. And that requirement was valid not only for future activities but also for existing facilities in operation. Taking into account the undergoing legislative process, SCNRS began to develop its licensing process without waiting for the special nuclear laws to be passed. On the basis of the legislation already in effect, first of all the Law on Enterprises (full responsibility of enterprises for their activities) and Law on Business activities (requirement to have a license for special types of activities), the newly formed national regulatory body had to identify all the enterprises that needed to be licensed, to establish relevant procedures, to develop related regulatory documents, to implement these procedures and documents at operating enterprises, and for each case to make a decision concerning feasibility of issuing a license, period of validity and license conditions

  4. HTR-PM Safety requirement and Licensing experience

    International Nuclear Information System (INIS)

    Li Fu; Zhang Zuoyi; Dong Yujie; Wu Zongxin; Sun Yuliang

    2014-01-01

    HTR-PM is a 200MWe modular pebble bed high temperature reactor demonstration plant which is being built in Shidao Bay, Weihai, Shandong, China. The main design parameters of HTR-PM were fixed in 2006, the basic design was completed in 2008. The review of Preliminary Safety Analysis Report (PSAR) of HTR-PM was started in April 2008, completed in September 2009. In general, HTR- PM design complies with the current safety requirement for nuclear power plant in China, no special standards are developed for modular HTR. Anyway, Chinese Nuclear Safety Authority, together with the designers, developed some dedicated design criteria for key systems and components and published the guideline for the review of safety analysis report of HTR-PM, based on the experiences from licensing of HTR-10 and new development of nuclear safety. The probabilistic safety goal for HTR-PM was also defined by the safety authority. The review of HTR-PM PSAR lasted for one and a half years, with 3 dialogues meetings and 8 topics meetings, with more than 2000 worksheets and answer sheets. The heavily discussed topics during the PSAR review process included: the requirement for the sub-atmospheric ventilation system, the utilization of PSA in design process, the scope of beyond design basis accidents, the requirement for the qualification of TRISO coating particle fuel, and etc. Because of the characteristics of first of a kind for the demonstration plant, the safety authority emphasized the requirement for the experiment and validation, the PSAR was licensed with certain licensing conditions. The whole licensing process was under control, and was re-evaluated again after Fukushima accident to be shown that the design of HTR-PM complies with current safety requirement. This is a good example for how to license a new reactor. (author)

  5. Post-hoc simulation study to adopt a computerized adaptive testing (CAT) for a Korean Medical License Examination.

    Science.gov (United States)

    Seo, Dong Gi; Choi, Jeongwook

    2018-05-17

    Computerized adaptive testing (CAT) has been adopted in license examinations due to a test efficiency and accuracy. Many research about CAT have been published to prove the efficiency and accuracy of measurement. This simulation study investigated scoring method and item selection methods to implement CAT in Korean medical license examination (KMLE). This study used post-hoc (real data) simulation design. The item bank used in this study was designed with all items in a 2017 KMLE. All CAT algorithms for this study were implemented by a 'catR' package in R program. In terms of accuracy, Rasch and 2parametric logistic (PL) model performed better than 3PL model. Modal a Posteriori (MAP) or Expected a Posterior (EAP) provided more accurate estimates than MLE and WLE. Furthermore Maximum posterior weighted information (MPWI) or Minimum expected posterior variance (MEPV) performed better than other item selection methods. In terms of efficiency, Rasch model was recommended to reduce test length. Simulation study should be performed under varied test conditions before adopting a live CAT. Based on a simulation study, specific scoring and item selection methods should be predetermined before implementing a live CAT.

  6. Design/licensing of on-site package for core component

    International Nuclear Information System (INIS)

    Ogasawara, K.; Chohzuka, T.; Shimura, T.; Kikuchi, T.; Fujiwara, R.; Karigome, S.; Takani, M.

    1993-01-01

    For storage of used core components which are produced from reactors, Tohoku EPCO decided to construct a site bunker at Onagawa site. It was also decided to develop and fabricate one packaging to transport core components from the reactor buildings to the site bunker. The packaging will be used within the power station; therefore, it shall comply with 'The Law for the Business of Electric Power' and relevant Notification. The main requirements of the packaging are as follows: 1) The number of contents, such as channel boxes and control rods, shall be as large as possible. 2) The weight and the outer dimensions of the packaging shall be within the limitation of the reactor building and the site bunker. 3) Materials shall be selected from those which have been already applied for existing packagings and utilized without any problems. 4) It shall be considered during design of trunnions that handling equipment, such as lifting beam, can be used for not only this packaging but also for existing spent fuel packagings. The design of the packaging is completed and has been licensed. The packaging is scheduled to be utilized from November, 1993. (J.P.N.)

  7. The strategy of experimental power reactor licensing in Indonesia

    International Nuclear Information System (INIS)

    Moch Djoko Birmano

    2015-01-01

    Currently, BATAN has being planned to develop Experimental Power Reactor (EPR), that is the research nuclear reactor that can generate power (electricity or heat). The EPR is planned will be built in the National Center for Research of Science and Technology (Puspiptek) area at Serpong, South Tangerang, Banten Province, with the choice of reactor types is HTGR with the power size of 10 MWth. As stated in the Act No. 10 year 1997 on Nuclear Power, that every construction and operation of nuclear reactors and other nuclear installations and decommissioning of nuclear reactors required to have a permit. Furthermore, the its implementation arrangements is regulated in Government Regulation (GR) No. 2 year 2014 on Licensing of Nuclear Installations and Nuclear Material Utilization, which contains the requirements and procedures for the licensing process since site, construction, commissioning, operation, and decommissioning, it means licensing is implemented during the activity of construction, operation and decommissioning of NPPs.While, for the more detailed licensing arrangements available in the guidelines of BAPETEN Chairman Regulation (BCR). This study was conducted to understand the legal and institutional aspects, types and stages, and the licensing process of RDE, and identify licensing strategy so that timely as planned. Methodologies used include the literature study, consultation with experts in BAPETEN, discussions in the national seminar including FGD. (author)

  8. Luminaire layout: Design and implementation

    Science.gov (United States)

    Both, A. J.

    1994-01-01

    The information contained in this report was presented during the discussion regarding guidelines for PAR uniformity in greenhouses. The data shows a lighting uniformity analysis in a research greenhouse for rose production at the Cornell University campus. The luminaire layout was designed using the computer program Lumen-Micro. After implementation of the design, accurate measurements were taken in the greenhouse and the uniformity analysis for both the design and implementation were compared. A study of several supplemental lighting installations resulted in the following recommendations: include only the actual growing area in the lighting uniformity analysis; for growing areas up to 20 square meters, take four measurements per square meter; for growing areas above 20 square meters, take one measurement per square meter; use one of the uniformity criteria and frequency graphs to compare lighting uniformity amongst designs; and design for uniformity criterion of a least 0.75 and the fraction within +/- 15% of the average PAR value should be close to one.

  9. Cost and risk reduction using upfront licensing in Canada. Annex 15

    International Nuclear Information System (INIS)

    Snell, V.G.

    2002-01-01

    The paper summarizes the use of 'up-front' licensing in Canada - how licensing requirements are defined, and met - in advance of a project commitment. The approach to licensing in Canada has allowed flexibility in development of new designs. Since licensing was originally risk-based, and current regulatory policy allows cost-benefit considerations as part of the decision making, risk can be and should be used in novel circumstances as a licensing tool. Since the licensing framework is non-prescriptive, innovative approaches to design can be introduced and dispositioned without changing the legal structure. This flexibility has been used in several up-front licensing reviews: a small urban heating reactor, repeat CANDU 6 generating station units, and the single unit CANDU 9 generating station. In the future we expect to apply it to advanced designs, as an essential part of risk reduction and customer confidence in the product. The important lessons learned in Canada include: Up-front licensing is essential to reduce the risk of licensing-related delays once a project has been committed. It requires a significant investment in time and effort from both the designer and the regulator; The most effective scope for up-front licensing is for the regulator to thoroughly assess novel concepts, test the design against changed domestic requirements, and follow-up on known difficult areas; and for the designer to ensure foreign requirements are incorporated. There is little benefit in certifying the design in detail; Although it would be satisfying to have legally-binding certification, in the end there can be no legal obligation on the regulator, and agreement is pursued on the basis of good faith that the regulator will not make arbitrary decisions and that the designer will meet agreed targets or requirements; In almost all circumstances, issues will arise that are beyond the current 'rules', however expressed. Rather than rushing to create new rules, one reaches a

  10. Dry spent fuel storage licensing

    International Nuclear Information System (INIS)

    Sturz, F.C.

    1995-01-01

    In the US, at-reactor-site dry spent fuel storage in independent spent fuel storage installations (ISFSI) has become the principal option for utilities needing storage capacity outside of the reactor spent fuel pools. Delays in the geologic repository operational date at or beyond 2010, and the increasing uncertainty of the US Department of Energy's (DOE) being able to site and license a Monitored Retrievable Storage (MRS) facility by 1998 make at-reactor-site dry storage of spent nuclear fuel increasingly desirable to utilities and DOE to meet the need for additional spent fuel storage capacity until disposal, in a repository, is available. The past year has been another busy year for dry spent fuel storage licensing. The licensing staff has been reviewing 7 applications and 12 amendment requests, as well as participating in inspection-related activities. The authors have licensed, on a site-specific basis, a variety of dry technologies (cask, module, and vault). By using certified designs, site-specific licensing is no longer required. Another new cask has been certified. They have received one new application for cask certification and two amendments to a certified cask design. As they stand on the brink of receiving multiple applications from DOE for the MPC, they are preparing to meet the needs of this national program. With the range of technical and licensing options available to utilities, the authors believe that utilities can meet their need for additional spent fuel storage capacity for essentially all reactor sites through the next decade

  11. Implementing hospital quality assurance policies in Iran: balancing licensing, annual evaluation, inspections and quality management systems.

    Science.gov (United States)

    Aghaei Hashjin, Asgar; Delgoshaei, Bahram; Kringos, Dionne S; Tabibi, Seyed Jamaladin; Manouchehri, Jila; Klazinga, Niek S

    2015-01-01

    The purpose of this paper is to provide an overview of applied hospital quality assurance (QA) policies in Iran. A mixed method (quantitative data and qualitative document analysis) study was carried out between 1996 and 2010. The QA policy cycle forms a tight monitoring system to assure hospital quality by combining mandatory and voluntary methods in Iran. The licensing, annual evaluation and grading, and regulatory inspections statutorily implemented by the government as a national package to assure and improve hospital care quality, while implementing quality management systems (QMS) was voluntary for hospitals. The government's strong QA policy legislation role and support has been an important factor for successful QA implementation in Iran, though it may affected QA assessment independency and validity. Increased hospital evaluation independency and repositioning, updating standards, professional involvement and effectiveness studies could increase QA policy impact and maturity. The study highlights the current QA policy implementation cycle in Iranian hospitals. It provides a basis for further quality strategy development in Iranian hospitals and elsewhere. It also raises attention about finding the optimal balance between different QA policies, which is topical for many countries. This paper describes experiences when implementing a unique approach, combining mandatory and voluntary QA policies simultaneously in a developing country, which has invested considerably over time to improve hospital quality. The experiences with a mixed obligatory/voluntary approach and comprehensive policies in Iran may contain lessons for policy makers in developing and developed countries.

  12. The impact of safety standards updating for design purposes in nuclear power plants licensing

    International Nuclear Information System (INIS)

    Alvarenga, Marco Antonio Bayout; Rabello, Sidney Luiz

    2009-01-01

    The Brazilian experience of nuclear power plants licensing was consolidated by the use of the Brazilian, American, German and IAEA standards. Independently of the set of norms, standards or guides to be used, this set should be in consonance with the state-of-art or the current state of knowledge in science and technology. In the general design criteria of US NRC or German BMI, or in the Brazilian norms (CNEN) or even, in the IAEA standards, this aspect is always emphasized. On the other hand, the international operational experience of nuclear reactors (for example, TMI accident) also contributes to the updating of norms and standards. The use of new technologies (for example, digital technology) impels the norms and standards to adopt new design criteria related to the new technological context. Moreover, we must add the particular vision that each country can have concerning to specific topics in nuclear safety. This work discusses how the norms, standards and guides used in the nuclear licensing are being reviewed to cope with the requirement of the state-of-art. In order to accomplish this aim we took some general design criteria to exemplify how they are fulfilled, mainly those related directly with the protection of the defense-in-depth barriers: primary coolant system, containment vessel and containment systems, including external events and severe accidents. In complement to the deterministic analysis, it is also discussed the design criteria related to the human factors engineering and probabilistic safety analysis, including severe accidents aspects. (author)

  13. Establishment of regulatory framework for the development reactor licensing

    International Nuclear Information System (INIS)

    Jo, Jong C.; Yune, Young G.; Kim, Woong S.; Ahn, Sang K.; Kim, In G.; Kim, Hho J.

    2003-01-01

    With a trend that various types of advanced reactor designs are currently under development worldwide, the Korea Atomic Energy Research Institute has been developing an advanced reactor called ' System-integrated Modular Advanced Reactor (SMART)', which is a small sized integral type pressurized water reactor with a rated thermal power of 330 MW. To demonstrate the safety and the performance of the SMART reactor design, the SMART Research and Development Center has embarked to build a scaled-down pilot plant of SMART, called 'SMART-P' with a rated thermal power of 65 MW. In preparation for the forthcoming applications for both construction permit and operating license of SMART-P in the near future, the Korea Institute of Nuclear Safety is developing a new regulatory framework for licensing review of such a development reactor, which covers establishment of licensing process, identification and resolution of technical and safety issues, development of regulatory evaluation or verification-purpose computer codes and analytical methods, and establishment of design-specific, general design and operating criteria, regulations, and associated regulatory guides. This paper presents the current activities for establishing a regulatory framework for the licensing of a research and development reactor. Discussions are made on the SMART-P development program, the current Korean regulatory framework for reactor licensing, the SMART-P licensing-related issues, and the approach and strategy for developing an effective regulatory framework for the SMART-P licensing

  14. Advanced CANDU reactor pre-licensing progress

    International Nuclear Information System (INIS)

    Popov, N.K.; West, J.; Snell, V.G.; Ion, R.; Archinoff, G.; Xu, C.

    2005-01-01

    The Advanced CANDU Reactor (ACR) is an evolutionary advancement of the current CANDU 6 reactor, aimed at producing electrical power for a capital cost and at a unit-energy cost significantly less than that of the current reactor designs. The Canadian Nuclear Safety Commission (CNSC) staff are currently reviewing the ACR design to determine whether, in their opinion, there are any fundamental barriers that would prevent the licensing of the design in Canada. This CNSC licensability review will not constitute a licence, but is expected to reduce regulatory risk. The CNSC pre-licensing review started in September 2003, and was focused on identifying topics and issues for ACR-700 that will require a more detailed review. CNSC staff reviewed about 120 reports, and issued to AECL 65 packages of questions and comments. Currently CNSC staff is reviewing AECL responses to all packages of comments. AECL has recently refocused the design efforts to the ACR-1000, which is a larger version of the ACR design. During the remainder of the pre-licensing review, the CNSC review will be focused on the ACR-1000. AECL Technologies Inc. (AECLT), a wholly-owned US subsidiary of AECL, is engaged in a pre-application process for the ACR-700 with the US Nuclear Regulatory Commission (USNRC) to identify and resolve major issues prior to entering a formal process to obtain standard design certification. To date, the USNRC has produced a Pre-Application Safety Assessment Report (PASAR), which contains their reviews of key focus topics. During the remainder of the pre-application phase, AECLT will address the issues identified in the PASAR. Pursuant to the bilateral agreement between AECL and the Chinese nuclear regulator, the National Nuclear Safety Administration (NNSA) and its Nuclear Safety Center (NSC), NNSA/NSC are reviewing the ACR in seven focus areas. The review started in September 2004, and will take three years. The main objective of the review is to determine how the ACR complies

  15. Designing and implementing a balanced scorecard: lessons learned in nonprofit implementation.

    Science.gov (United States)

    Gumbus, Andra; Wilson, Tom

    2004-01-01

    The balanced scorecard has been referred to as the management innovation of the century, and extensive articles have been written using case studies of organizations that use this performance measurement system. This article addresses the key issues of design and implementation with a step-by-step guide to how to design a balanced scorecard and lessons to avoid implementation problems in government and nonprofit settings.

  16. Licensing and Environmental Issues of Wave Energy Projects

    DEFF Research Database (Denmark)

    Neumann, Frank; Tedd, James; Prado, Miguel

    2006-01-01

    a special standing or facilitated access to operating licenses due to their experimental character, the move of wave energy projects towards commercial applications implies complex procedures for obtaining licenses both with respect to the construction and deployment and operation phases, as well......The major non-technical barrier for large-scale wave energy implementation is the wide range of licensing issues and potential environmental concerns, in addition to significant National/regional differences in licensing procedures and permit requirements. Whereas some pilot plants have had...... as concerning ocean space use and environmental concerns. Despite recent efforts to streamline European EIA (Environmental Impact Assessment) in general, potential project developers are far from having a clear view of present and future requirements concerning these barriers on a trans-national level...

  17. Research and development associated with licensing of MHTGR [Modular High Temperature Gas-Cooled Reactor

    International Nuclear Information System (INIS)

    Jones, H.

    1990-01-01

    The Modular High Temperature Gas-Cooled Reactor (MHTGR) currently under development by the US Department of Energy (US-DOE) for commercial applications has top-level goals of producing safe, economical power for the US utility industry. The utility industry has been represented in formulating design and licensing requirements through both a ''Utility User Requirements Document'' and by participating in the DOE system engineering process known as the ''Integrated Approach.'' The result of this collaboration has been to set stringent goals for both the safety and operational reliability of the MHTGR. To achieve these goals, the designer must have access to a more comprehensive data base of properties in several fields of technology than is currently available. A technology development program has been planned to provide this data to the designer in time to support both his design activities and the submittal of formal licensing application documents. The US-DOE has chosen the Oak Ridge National Laboratory (ORNL) to take the lead in planning and executing these technology programs. When completed these will augment the designer's current data base and provide the necessary depth to meet the stringent goals which have been set for the MHTGR. It is worth noting that the goals of safety and operational reliability are complementary, and the data required from the technology development program will be similar. Therefore, the program to support the licensing of the MHTGR is not separate from that required for design, but is a subset of that which meets all the requirements that result from implementing the US-DOE's integrated approach. 38 figs

  18. The changing shape of U.S. licensing philosophy

    International Nuclear Information System (INIS)

    Remick, F.J.

    1992-01-01

    The shape of U.S. nuclear licensing and regulatory philosophy and process has already changed. The new process requires NRC review and approval of the vendor designs before a prospective utility license applicant purchases the design and begins construction. The new philosophy has resulted from the lessons learned from extensive operating experience accumulated in the United States. New criteria established for judging reactor designs include the capability of future designs to be more tolerant of accidents beyond the traditional design basis events. Qualitative and quantitative goals have been chosen as a guide for allocating resources for regulation of the currently operating plants. The changing shape of nuclear licensing and regulatory philosophy is also a result of economic circumstances in the United States. All will have a better opportunity to take part in the process which is most likely to encourage further development of safe nuclear energy in the United States. (author)

  19. Will nuclear power plant standardization reduce the licensing impact on construction

    International Nuclear Information System (INIS)

    Allen, J.M.; Bingham, W.G.; Keith, D.G.

    1976-01-01

    The NRC and the nuclear industry have been pursuing standardization quite vigorously in an effort to reduce the cost and schedule for the design and construction of nuclear power plants. The NRC is currently reviewing standard plant applications submitted under each of four standardization options. In addition, the NRC has published Standard Review Plans and Standard Technical Specifications. Although problems exist in the implementation of standardization and in areas unaffected by standardization, each of these standardization methods has the potential to reduce the licensing impact on construction

  20. Mobilizing the Courage to Implement Sustainable Design Solutions

    DEFF Research Database (Denmark)

    Nielsen, Susanne Balslev; Hoffmann, Birgitte; Quitzau, Maj-Britt

    2009-01-01

    of design managers and others to develop socio-technical networks and storylines to integrate sustainability in the design and building processes. Implementation of sustainable design solutions takes more than courage; it requires key competences in catalysing network changes......., the work focuses on examples of successful implementation in an attempt to understand the competences required. Danish frontrunner projects are described and analysed: one case concerns the implementation of lowenergy houses and another describes innovative planning processes in the water sector in order...... networks and creative work forms constitutes the outset for change. The work is inspired by the actor-network theory, emphasizing the momentum of prevailing practices, and the need to (re)develop networks to support implementation of sustainable design solutions. Conclusions point to the importance...

  1. 10 CFR Appendix N to Part 50 - Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate...

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... FACILITIES Pt. 50, App.N Appendix N to Part 50—Standardization of Nuclear Power Plant Designs: Permits To...

  2. Westinghouse AP1000 advanced passive plant: design features and benefits

    International Nuclear Information System (INIS)

    Walls, S.J.; Cummins, W.E.

    2003-01-01

    The Westinghouse AP1000 Program is aimed at implementing the AP1000 plant to provide a further major improvement in plant economics while maintaining the passive safety advantages established by the AP600. An objective is to retain to the maximum extent possible the plant design of the AP600 so as to retain the licensing basis, cost estimate, construction schedule, modularization scheme, and the detailed design from the AP600 program. Westinghouse and the US Nuclear Regulatory Commission staff have embarked on a program to complete Design Certification for the AP1000 by 2004. A pre-certification review phase was completed in March 2002 and was successful in establishing the applicability of the AP600 test program and AP600 safety analysis codes to the AP1000 Design Certification. On March 28, 2002, Westinghouse submitted to US NRC the AP1000 Design Control Document and Probabilistic Risk Assessment, thereby initiating the formal design certification review process. The results presented in these documents verify the safety performance of the API 000 and conformance with US NRC licensing requirements. Plans are being developed for implementation of a series of AP1000 plants in the US. Key factors in this planning are the economics of AP1000, and the associated business model for licensing, constructing and operating these new plants. Similarly plans are being developed to get the AP1000 design reviewed for use in the UK. Part of this planning has been to examine the AP1000 design relative to anticipated UK safety and licensing issues. (author)

  3. 10 CFR Appendix N to Part 52 - Standardization of Nuclear Power Plant Designs: Combined Licenses To Construct and Operate...

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Standardization of Nuclear Power Plant Designs: Combined Licenses To Construct and Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... FOR NUCLEAR POWER PLANTS Pt. 52, App. N Appendix N to Part 52—Standardization of Nuclear Power Plant...

  4. PROCESS FOR LICENSE APPLICATION DEVELOPMENT FOR THE GEOLOGIC REPOSITORY

    International Nuclear Information System (INIS)

    DOUGLAS M. FRANKS AND NORMAN C. HENDERSON

    1997-01-01

    The Department of Energy (DOE), specifically the Office of Civilian Radioactive Waste Management (OCRWM) has been charged by the U.S. Congress, through the Nuclear Waste Policy Act (NWPA), with the responsibility for obtaining a license to develop a geologic repository. The NRC is the licensing authority for geologic disposal, and its regulations pertinent to construction authorization and license application are specified in 10 CFR Part 60, Disposal of High-Level Radioactive Wastes in Geologic Repositories, (section)60.21ff and (section)60.31ff. This paper discusses the process the Yucca Mountain Site Site Characterization Project (YMP) will use to identify and apply regulatory and industry guidance to development of the license application (LA) for a geologic repository at Yucca Mountain, Nevada. This guidance will be implemented by the ''Technical Guidance Document for Preparation of the License Application'' (TGD), currently in development

  5. Process for license application development for the geologic repository

    International Nuclear Information System (INIS)

    Franks, D.M.; Henderson, N.C.

    1998-01-01

    The Department of Energy (DOE), specifically the Office of Civilian Radioactive Waste Management (OCRWM) has been charged by the US Congress, through the Nuclear Waste Policy Act (NWPA), with the responsibility for obtaining a license to develop a geologic repository. The NRC is the licensing authority for geologic disposal, and its regulations pertinent to construction authorization and license application are specified in 10 CFR Part 60, Disposal of High-Level Radioactive Wastes in Geologic Repositories, section 60.21ff and section 60.31ff. This paper discusses the process the Yucca Mountain Site Characterization Project (YMP) will use to identify and apply regulatory and industry guidance to development of the license application (LA) for a geologic repository at Yucca Mountain, Nevada. This guidance will be implemented by the Technical Guidance Document for Preparation of the License Application (TGD), currently in development

  6. Licensing of HTGRs in the United States

    International Nuclear Information System (INIS)

    Fisher, C.R.; Orvis, D.D.

    1981-01-01

    The licensing history of the high-temperature gas-cooled reactor (HTGR) in the United States is given historical perspective. The experience began with the licensing of the Peach Bottom Atomic Power Station and extends to the continuing experience at the Fort St. Vrain Nuclear Generating Station. Additional experience was obtained from the licensing reviews in the mid-1970s of the large HTGR plants that were to be built by Philadelphia Electric Company and Delmarva Power and Light. Also, information was provided by the licensing review of the General Atomic standard plant by the U.S. Nuclear Regulatory Commission (NRC) at about the same time. These experiences are summarized in terms of the principal design criteria that were required by the regulatory authority for each project. These criteria include specification of the design basis accidents that were postulated for the plant safety analysis. Several technical issues raised by the NRC during their review of the large HTGR are presented. (author)

  7. Licensing of HTGRs in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Fisher, C. R.; Orvis, D. D. [General Atomic Co., San Diego, CA (USA)

    1981-01-15

    The licensing history of the high-temperature gas-cooled reactor (HTGR) in the United States is given historical perspective. The experience began with the licensing of the Peach Bottom Atomic Power Station and extends to the continuing experience at the Fort St. Vrain Nuclear Generating Station. Additional experience was obtained from the licensing reviews in the mid-1970s of the large HTGR plants that were to be built by Philadelphia Electric Company and Delmarva Power and Light. Also, information was provided by the licensing review of the General Atomic standard plant by the U.S. Nuclear Regulatory Commission (NRC) at about the same time. These experiences are summarized in terms of the principal design criteria that were required by the regulatory authority for each project. These criteria include specification of the design basis accidents that were postulated for the plant safety analysis. Several technical issues raised by the NRC during their review of the large HTGR are presented.

  8. Development of Advanced Non-LOCA Analysis Methodology for Licensing

    International Nuclear Information System (INIS)

    Jang, Chansu; Um, Kilsup; Choi, Jaedon

    2008-01-01

    KNF is developing a new design methodology on the Non-LOCA analysis for the licensing purpose. The code chosen is the best-estimate transient analysis code RETRAN and the OPR1000 is aimed as a target plant. For this purpose, KNF prepared a simple nodal scheme appropriate to the licensing analyses and developed the designer-friendly analysis tool ASSIST (Automatic Steady-State Initialization and Safety analysis Tool). To check the validity of the newly developed methodology, the single CEA withdrawal and the locked rotor accidents are analyzed by using a new methodology and are compared with current design results. Comparison results show a good agreement and it is concluded that the new design methodology can be applied to the licensing calculations for OPR1000 Non-LOCA

  9. The licensing processes influence on nuclear market

    International Nuclear Information System (INIS)

    Locatelli, Giorgio; Mancini, Mauro; Sainati, Tristano; Sallinen, Liisa

    2011-01-01

    The paper deals with the licensing nuclear power plants; it focuses primarily on the licensing process implications into the international nuclear market. Nowadays there are twenty-six countries that are planning to build new nuclear facilities, and thirty-seven where nuclear reactors are proposed; on the other hand, there are mainly ten international reactor vendors. At international level, there are few vendors that have sufficient resources, capabilities and experience to carry out the design and delivering of a nuclear power plant in the international market; On the other hand, the licensing processes are strictly dependent on national law frameworks, and on the nuclear policies. The paper proposes a comparison of six licensing processes (the ones established in Finland, France, Italy, South Korea, USA and UK), and analyzes its main features and implications; the IAEA licensing process is taken as reference point. The objective of the paper is to propose a systemic approach for considering the licensing procedures. The framework proposed enables facilitating the licensing management and inferring the main features of licensing contexts. The paper concludes with a forecast of the nuclear licensing context, especially with respect to the fourth generation of nuclear reactors. (author)

  10. Licensing of nuclear reactor operators

    International Nuclear Information System (INIS)

    1979-09-01

    Recommendations are presented for the licensing of nuclear reactor operators in units licensed according to the legislation in effect. They apply to all physical persons designated by the Operating Organization of the nuclear reactor or reactors to execute any of the following functional activities: a) to manipulate the controls of a definite reactor b) to direct the authorized activities of the reactor operators licesed according to the present recommendations. (F.E.) [pt

  11. Implementing The Safeguards-By-Design Process

    International Nuclear Information System (INIS)

    Whitaker, J. Michael; McGinnis, Brent; Laughter, Mark D.; Morgan, Jim; Bjornard, Trond; Bean, Robert; Durst, Phillip; Hockert, John; DeMuth, Scott; Lockwood, Dunbar

    2010-01-01

    The Safeguards-by-Design (SBD) approach incorporates safeguards into the design and construction of nuclear facilities at the very beginning of the design process. It is a systematic and structured approach for fully integrating international and national safeguards for material control and accountability (MC and A), physical protection, and other proliferation barriers into the design and construction process for nuclear facilities. Implementing SBD is primarily a project management or project coordination challenge. This paper focuses specifically on the design process; the planning, definition, organization, coordination, scheduling and interaction of the safeguards experts and stakeholders as they participate in the design and construction of a nuclear facility. It delineates the steps in a nuclear facility design and construction project in order to provide the project context within which the safeguards design activities take place, describes the involvement of the safeguards experts in the design process, the nature of their analyses, interactions and decisions, and describes the documents created and how they are used. This report highlights the project context of safeguards activities, and identifies the safeguards community (nuclear facility operator, designer/builder, state regulator, SSAC and IAEA) must accomplish in order to implement SBD within the project.

  12. Attitudes of Registered and Licensed Practical Nurses About the Importance of Families in Surgical Hospital Units: Findings From the Landspitali University Hospital Family Nursing Implementation Project.

    Science.gov (United States)

    Blöndal, Katrin; Zoëga, Sigridur; Hafsteinsdottir, Jorunn E; Olafsdottir, Olof Asdis; Thorvardardottir, Audur B; Hafsteinsdottir, Sigrun A; Sveinsdóttir, Herdis

    2014-08-01

    The purpose of this study was to examine attitudes of registered nurses and licensed practical nurses about the importance of the family in surgical hospital units before (T1) and after (T2) implementation of a Family Systems Nursing educational intervention based on the Calgary Family Assessment and Intervention Models. This study was part of the Landspitali University Hospital Family Nursing Implementation Project and used a nonrandomized, quasi-experimental design with nonequivalent group before and after and without a control group. There were 181 participants at T1 and 130 at T2. No difference was found in nurses' attitudes as measured by the Families Importance in Nursing Care-Nurses' Attitudes (FINC-NA) questionnaire, before and after the educational intervention. Attitudes toward families were favorable at both times. Analysis of demographic variables showed that age, work experience, and workplace (inpatient vs. outpatient units) had an effect on the nurses' attitudes toward families. The influence of work experience on attitudes toward family care warrants further exploration. © The Author(s) 2014.

  13. Operating reactors licensing actions summary. Volume 5, No. 2

    International Nuclear Information System (INIS)

    1985-04-01

    The Operating Reactors Licensing Actions Summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Resource Management. This summary report is published primarily for internal NRC use in managing the Operating Reactors Licensing Actions Program

  14. The use of U.S. NRC licensing practices for VVERs

    International Nuclear Information System (INIS)

    Popp, D.M.

    2000-01-01

    The licensing process for the upgraded Temelin I and C and Fuel designs were enhanced with the introduction of U.S. Nuclear Regulatory Commission, NRC practices. Specifically, the use of the NRC Regulatory Guide 1.70, 'Standard Format and Content Guide for Safety Analyses Reports' and NRC NUREG 0800, 'Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants', were beneficial in the development and review of Temelin licensing documentation. These standards have been used for the preparation and review of Safety Analysis Reports in the United States and also in a large number of licensing applications around the world. Both Regulatory Guide 1.70 and NUREG 0800 were developed to provide a predictable and structured approach to licensing. This paper discusses this approach and identifies the benefits to designers, writers of licensing documentation and reviewers of licensing documents. (author)

  15. Implementing GoF Design Patterns in BETA

    DEFF Research Database (Denmark)

    Agerbo, Ellen; Cornils, Aino

    1998-01-01

    In this paper it is investigated how well the Beta supports the Design Patterns presented in [GoF 95]. We go through the language constructs in Beta to show which prove especially useful when implementing these Design Patterns. It is a fact that several of the Design Patterns found in [GoF 95] can...... be implemented in a simpler and more straightforward way in Beta than in ordinary OO-languages. This leads us to consider whether it is true that the more advanced OO-language one uses, the more of these Design Patterns are included directly in the language constructs....

  16. Safety methodology implementation in the conceptual design phase of a fusion reactor

    International Nuclear Information System (INIS)

    Rodriguez-Rodrigo, L.; Elbez-Uzan, J.

    2007-01-01

    The licensing of ITER in France represents the first process for licensing a fusion facility in the framework of an experimental device with a total Tritium inventory of 3 kg. The main ITER parameters are far from those expected in the future demonstration reactors where the fusion power will be at least 5 times higher and the additional heating power could also reach up to 5 times the one foreseen in ITER. Main safety requirements for these reactors are based, among other conditions, on their inherent features as low amount of fuel, very low impurity content of structural materials, minimum waste repository, no active systems for safe shut-down, and no need for evacuation of population after the most severe accident. The design of such reactors is at the stage of conceptual studies and is mainly dealing with plasma performances, tritium breeding, blanket/divertor designs and solution of engineering issues, as well as bounding accidents or classification of waste. The methodological approach for integrating safety analysis as a tool for optimizing the design of the overall fusion installation for future reactors in the conceptual design phase is sketched, including the machine itself and the different auxiliary nuclear buildings. (author)

  17. Reassessing Occupational Licensing Of Tour Guides (Opinion Piece

    Directory of Open Access Journals (Sweden)

    Amir SHANI

    2017-06-01

    Full Text Available It is conventionally held that to protect tourists from incompetent and/or unscrupulous tour guides, governments should require guides to be licensed in order to legally practice their profession. Despite the implementation of such regulatory statutes in many countries, it is argued in this opinion paper that the severe drawbacks of licensing demands should be re-evaluated by both policy-makers and tourism scholars. The licensing of guides is not only an ineffective means of quality assurance, with negative consequences for many of those involved, but it also undermines the ethical foundations of a free society. Furthermore, licensing is an archaic practice for ensuring standardization among the members of a profession in a way that is no longer suitable for addressing the challenges of the tourism industry in the 21st century, in which a wide variety of specialized and innovative guided tours are offered to tourists. Although this commentary presents a firm stand against the compulsory licensing of tour guides, it should be seen as an invitation for open discussion among tourism researchers regarding the necessity of licensing tour guides in particular, and of government tourism regulation in general. Moreover, further research is needed to clarify key points on the issue of the professional licensing of tour guides.

  18. Fuel licensing process for an industrial use. ATF licensing process for an industrial use - Utility's perspective

    International Nuclear Information System (INIS)

    Waeckel, Nicolas

    2013-01-01

    the reliability of the ATF rods (within the hosting FA). It is recommended to perform out-of pile endurance tests, in-pile irradiation tests (in prototypical conditions) before starting an irradiation in a commercial reactor. It is known that a single 'bad' rod failure could result in a costly premature shut-down of the NPP. If the ATF rods or assemblies are not compatible with the current NPPs fuel cores designs, the ATF concept validation will rely on MTRs irradiations only and the whole core will have to be removed before introducing the new fuel concept. This process is going to be risky and costly. In addition to finding the right ATF concept, the developers will have to address the (small and large scale) manufacturing issues, the accidental and normal operation behaviour issues (cladding, fuel pellet and their interactions with the fuel assembly structure), the economic vs. benefit vs. risk issues regarding the implementation of a new fuel concept. Defining an appropriate licensing process (new concept means new requirements and limits) is a motivating challenge. Considering the current discharge burn-ups observed in the nuclear industry (>60 Gwd/t) and the related time to get any irradiation feedback, the entire development/licensing process will be likely much longer than expected (30 years)

  19. Licensing topical report: application of probabilistic risk assessment in the selection of design basis accidents

    International Nuclear Information System (INIS)

    Houghton, W.J.

    1980-06-01

    A probabilistic risk assessment (PRA) approach is proposed to be used to scrutinize selection of accident sequences. A technique is described in this Licensing Topical Report to identify candidates for Design Basis Accidents (DBAs) utilizing the risk assessment results. As a part of this technique, it is proposed that events with frequencies below a specified limit would not be candidates. The use of the methodology described is supplementary to the traditional, deterministic approach and may result, in some cases, in the selection of multiple failure sequences as DBAs; it may also provide a basis for not considering some traditionally postulated events as being DBAs. A process is then described for selecting a list of DBAs based on the candidates from PRA as supplementary to knowledge and judgments from past licensing practice. These DBAs would be the events considered in Chapter 15 of Safety Analysis Reports of high-temperature gas-cooled reactors

  20. Operating reactors licensing actions summary. Vol.4, No. 4

    International Nuclear Information System (INIS)

    1984-06-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors

  1. Operating reactors licensing actions summary. Volume 5, No. 7

    International Nuclear Information System (INIS)

    1985-09-01

    The Operating Reactors Licensing Actions Summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Resource Management

  2. Operating reactors licensing actions summary. Vol. 3, No. 3

    International Nuclear Information System (INIS)

    1983-04-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regularory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program

  3. The road to MYRRHA. The pre-licensing phase and FEED

    International Nuclear Information System (INIS)

    2014-01-01

    The article discusses the study phase of the future research reactor MYRRHA. This study phase covers three major areas: Research and Development, licensing and engineering. In 2013, substantial progress was made in the licensing and engineering processes: licensing is currently in the pre-licensing phase, while, for engineering, the Front-end Engineering and Design (FEED) contract was signed for the construction of the non-nuclear parts of MYRRHA. The article highlights work associated with the the pre-licensing phase and the FEED.

  4. Survey of extreme load design regulatory agency licensing requirements for nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Stevenson, J D

    1976-04-01

    Since 1965, when extreme load requirements began to be considered explicitly in nuclear power plant design, there has been a gradual divergence in requirements imposed by national regulatory agencies. However, nuclear plant safety is an international problem because of the potential international effects of any postulated plant failure. For this reason this paper has been prepared in an attempt to highlight the differences in national criteria currently used in the extreme load design of nuclear plant facilities. No attempt has been made to evaluate the relative merit of the criteria established by the various national regulatory agencies. This paper presents the results of a recent survey made of national atomic energy regulatory agencies and major nuclear steam supply design agencies, which requested a summary of current licensing criteria associated with earthquake, extreme wind (tornado), flood, airplane crash and accident (pipe break) loads applicable within the various national jurisdictions. Also presented are a number of comparisons which are meant to illustrate the differences in national regulatory criteria.

  5. Survey of extreme load design regulatory agency licensing requirements for nuclear power plants

    International Nuclear Information System (INIS)

    Stevenson, J.D.

    1976-01-01

    Since 1965, when extreme load requirements began to be considered explicitly in nuclear power plant design, there has been a gradual divergence in requirements imposed by national regulatory agencies. However, nuclear plant safety is an international problem because of the potential international effects of any postulated plant failure. For this reason this paper has been prepared in an attempt to highlight the differences in national criteria currently used in the extreme load design of nuclear plant facilities. No attempt has been made to evaluate the relative merit of the criteria established by the various national regulatory agencies. This paper presents the results of a recent survey made of national atomic energy regulatory agencies and major nuclear steam supply design agencies, which requested a summary of current licensing criteria associated with earthquake, extreme wind (tornado), flood, airplane crash and accident (pipe break) loads applicable within the various national jurisdictions. Also presented are a number of comparisons which are meant to illustrate the differences in national regulatory criteria. (Auth.)

  6. An Organizational-Technical Concept to Deal with Open Source Software License Terms

    Directory of Open Access Journals (Sweden)

    Sergius Dyck

    2016-06-01

    Full Text Available Open source software (OSS released under various license terms is widely used as third party libraries in today's software projects. To ensure open source compliance within an organization, a strategic approach to OSS management is needed. As basis for such an approach, we introduce an organizational-technical concept for dealing with the various OSS licenses by using procedural instructions and build automation software. The concept includes the careful consideration of OSS license conditions. The results obtained from this consideration and additional necessary commitments are documented in a so-called license playbook. We introduce procedure instructions enabling a consistent approach for software development using OSS libraries. The procedure instructions are described in a way such that they can be implemented for example for Java projects using the popular build automation tool Apache Maven and the software repository tool Nexus. We give guidance on how to realize such an implementation on basis of automation tools in practice.

  7. Licensed bases management for advanced nuclear plants

    International Nuclear Information System (INIS)

    O'Connell, J.; Rumble, E.; Rodwell, E.

    2001-01-01

    Prospective Advanced Nuclear Plant (ANP) owners must have high confidence that the integrity of the licensed bases (LB) of a plant will be effectively maintained over its life cycle. Currently, licensing engineers use text retrieval systems, database managers, and checklists to access, update, and maintain vast and disparate licensing information libraries. This paper describes the demonstration of a ''twin-engine'' approach that integrates a program from the emerging class of concept searching tools with a modern Product Data Management System (PDMS) to enhance the management of LB information for an example ANP design. (author)

  8. Licensed bases management for advanced nuclear plants

    Energy Technology Data Exchange (ETDEWEB)

    O' Connell, J [Duke Engineering and Services, Marlborough, MA (United States); Rumble, E; Rodwell, E [EPRI, Palo Alto, CA (United States)

    2001-07-01

    Prospective Advanced Nuclear Plant (ANP) owners must have high confidence that the integrity of the licensed bases (LB) of a plant will be effectively maintained over its life cycle. Currently, licensing engineers use text retrieval systems, database managers, and checklists to access, update, and maintain vast and disparate licensing information libraries. This paper describes the demonstration of a ''twin-engine'' approach that integrates a program from the emerging class of concept searching tools with a modern Product Data Management System (PDMS) to enhance the management of LB information for an example ANP design. (author)

  9. FPGA Design and Implementation of a Rangefinder

    Directory of Open Access Journals (Sweden)

    ALBU Răzvan-Daniel

    2017-10-01

    Full Text Available In this paper we will present the design and implementation of an ultrasonic non-contact rangefinder with FPGA. This rangefinder can be used in numerous applications, ranging from hardly accessible spaces to electromagnetically polluted environments. The experimental implementations proved to be accurate, portable, and easy to operate. Attributable to their programmable nature, FPGAs are an ideal fit for many dissimilar markets. Even though FPGAs used to be designated for lower speed and complexity designs in the past, today’s FPGAs effortlessly push the 500 MHz performance barricade. Since they bring features, such as embedded processors, DSP blocks, clocking, and high-speed serial at lower prices, FPGAs are a convincing alternative for almost any type of design.

  10. Operating reactors licensing actions summary. Vol. 3, No. 6

    International Nuclear Information System (INIS)

    1983-07-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  11. Operating reactors licensing actions summary. Volume 5, No. 6

    International Nuclear Information System (INIS)

    1985-08-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Resource Management. This summary report is published for internal NRC use in managing the Operating Reactors Licensing Actions Program. Its content will change based on NRC management informational requirements

  12. Implementing plant design changes economically

    International Nuclear Information System (INIS)

    Seamans, L.D.

    1994-01-01

    Consumers Power Company, as is the case with most utilities, is challenged by the necessity to control non-modification design changes. At the Consumers' Palisades Nuclear Plant, the challenge was met by the establishment of a project team that developed an innovative comprehensive design control process called Functional Equivalent Substitution (FES). This paper describes: (1) the project team composition; (2) the process development methodology; and (3) the implementation results

  13. Implementing E-Learning Designed Courses in General Education

    Science.gov (United States)

    Nuangchalerm, Prasart; Sakkumduang, Krissada; Uhwha, Suleepornn; Chansirisira, Pacharawit

    2014-01-01

    The aim of this study is to implement e-learning designed course for general education. The study employed 3 phases for developing e-learning course: contextual study, designing, and implementing. Two courses general education, 217 undergraduate students are participated the study. Research tool consisted of interview about e-learning form and…

  14. Introduction of designated organization to safeguards implementation in Japan

    International Nuclear Information System (INIS)

    Terada, Hiromi; Akiba, Mitsunori; Ando, Hisataka; Okazaki, Shuji; Irikura, Masatoshi; Kurihara, Hiroyoshi

    2000-01-01

    With domestic application of the IAEA new measures (program 93+2) for strengthening the effectiveness and improving the efficiency of the safeguards system, the Nuclear Regulation Laws was amended for implementation of the new measures based upon the Additional Protocol, and also the new Designated Organization System was introduced to the SSAC (States' System of Accounting for and Control of Nuclear Materials) for safeguards implementation in Japan since beginning of January 2000. On the basis of accumulated experiences of the state safeguards implementation for more than 20 years and then established standardization of the inspection procedures, the Japan's Government is able to utilize the expertise of private organizations for the safeguards implementation. Any capable organizations can be designated by the Government as the Designated Organization for all or a part of safeguards implementations on behalf of the Government. According to the amended Law, the Prime Minister can make the Designated Organization implement safeguards implementations that are defined firstly as safeguards inspections which can be done along the Government instructions without any discussions and decisions, secondarily as destructive analysis of safeguards samples, and thirdly as technical research on advanced safeguards measures. The amendment of the Law was approved by the National Diet on June 9th 1999 and entered into force on December 16th 1999. The Additional Protocol also entered into force in Japan at the same time. The NMCC (Nuclear Material Control Center) was designated as the Organization on December 27th 1999 and started the safeguards implementation in January 7th 2000. In order to prepare for the Designated Organization, the NMCC rearranged the organizational system and kept capable human resources enough for the safeguards implementations. Also the NMCC carried out many programs of education and training for the inspectors. Furthermore, manuals and criteria for the

  15. The Design and Development of Driving Game as an Evaluation Instrument for Driving License Test

    OpenAIRE

    Abdul Hadi Abdul Razak; Mohd Hairy Manap

    2013-01-01

    The focus of this paper is to highlight the design and development of an educational game prototype as an evaluation instrument for the Malaysia driving license static test. This educational game brings gaming technology into the conventional objective static test to make it more effective, real and interesting. From the feeling of realistic, the future driver can learn something, memorized and use it in the real life. The current online objective static test only make th...

  16. Technology neutral licensing requirements: have we been successful?

    International Nuclear Information System (INIS)

    Jamieson, T.

    2009-01-01

    The Canadian Nuclear Safety Commission (CNSC) is Canada's nuclear regulator. In preparation for the licensing of the next generation of nuclear reactors in Canada, the CNSC has made major changes in its processes and procedures associated with all aspects of the licensing life cycle. These include: development of key regulatory documents outlining the CNSC expectations for the design and siting of new reactors; creation of applicant guidelines for completing licensing applications; creation of a comprehensive set of review guides, specifying how topics in applications are to be reviewed; performing pre-project design reviews for proposed new reactor technologies; and streamlining processes wherever possible, such as performing the environmental assessment and license to prepare site activities in parallel. The predicted workload associated with the nuclear renaissance in Canada is real. The CNSC is currently performing: 4 pre-project design reviews (for AECL's ACR-1000 and EC-6, Areva's EPR and Westinghouse's AP-1000), has received applications for 4 new builds (at Darlington, Bruce, Nanticoke and in Alberta) and is in the midst of performing the combined environmental assessment and license to prepare site phases for these sites. This is in addition to the work associated with: the licensing of new uranium mines; oversight of the existing reactor fleet; refurbishments at Bruce/Gentilly/Point Lepreau; license renewal for the NRU reactor; and oversight of our general client base of over 5000 licensees. In this presentation, experience to date with these new processes and procedures will be discussed, including: status of the current new build projects; anticipated new activities; lessons learned, especially the technology neutral approach; application to our other licensed activities, including non-power reactors; and work underway to further develop CNSC methods. Qualifications Needed to Design, Construct and Manufacture Nuclear Systems and Equipment, C. Voutsinos

  17. Design and quality assurance of control and instrumentation systems, licensing practice in Austria

    International Nuclear Information System (INIS)

    Fasko, Peter.

    1978-01-01

    The practicised way how licensing of control and instrumentation systems is performed in Austria, is related. As there is no national regulations in Austria for licensing nuclear power plants, it tries to adopt international regulations for its own purpose. (author)

  18. Pelaksanaan Compulsory Licensing Paten Obat-obatan Bidang Farmasi di Indonesia Dikaitkan dengan Doha Declaration On The Trips Agreement And Public Health

    OpenAIRE

    Samariadi, Samariadi

    2016-01-01

    Purpose of this study is firstly to find out implementation of compulsory licensing patent medicines in Indonesia's pharmaceutical field linked Declaration DOHA, secondly to know resistance implementation of compulsory licensing to access drug in Indonesia, thirdly to know efforts should be done in implementation compulsory licensing as to support access public health. Author used legal research methods to get the result. Results of formulation problem, it can be concluded that, firstly imple...

  19. Licensing reform in the USA

    International Nuclear Information System (INIS)

    1991-01-01

    The licensing process for nuclear power plants in the USA is currently in two distinct stages: the issuance of a construction permit followed later by the issuance of an operation license. The ''two-step'' process has come under heavy criticism from the U.S. nuclear industry on the grounds that it causes uncertainty and delays and therefore inhibits new commitments to nuclear power plants. In 1989 the NRC published new regulations for the licensing of nuclear power plants which provide for the issuance of early site permits, safety certifications of standard designs, and combined construction permits and operating licences. The new rule was challenged by intervenors representing antinuclear groups who filed a legal challenge seeking to have the rule set aside on the grounds that it violates the Atomic Energy Act which they allege makes two-step licensing mandatory. In November 1990 the US Court of Appeals upheld the NRC's authority to issue combined licenses. An appeal for a rehearing has been filed. The paper analyses the events and the possible consequences of an adverse court decision. It reviews the options open to the NRC and industry if the court decision is upheld. The possibility of congressional action to amend the Atomic Energy Act is discussed. (author)

  20. Operating reactors licensing actions summary. Volume 5, Number 1

    International Nuclear Information System (INIS)

    1985-03-01

    This document is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Resource Management. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program

  1. Licensed bases management for advanced nuclear plants

    Energy Technology Data Exchange (ETDEWEB)

    O' Connell, J. [Duke Engineering and Services, Marlborough, MA (United States); Rumble, E.; Rodwell, E. [EPRI, Palo Alto, CA (United States)

    2001-07-01

    Prospective Advanced Nuclear Plant (ANP) owners must have high confidence that the integrity of the licensed bases (LB) of a plant will be effectively maintained over its life cycle. Currently, licensing engineers use text retrieval systems, database managers, and checklists to access, update, and maintain vast and disparate licensing information libraries. This paper describes the demonstration of a ''twin-engine'' approach that integrates a program from the emerging class of concept searching tools with a modern Product Data Management System (PDMS) to enhance the management of LB information for an example ANP design. (author)

  2. Stakes and Solutions for current and up-coming Licensing Challenges in PWR and BWR Reload and Safety Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Curca-Tiving, F.; Opel, S.

    2014-07-01

    Regulatory requirements for reloads and safety analyses are evolving: New safety criteria, requests for enlarged qualification databases, statistical applications, uncertainty propagation... In order to address these challenges and access more predictable licensing processes, AREVA implements a consistent code and methodology suite for PWR and BWR core design and safety analysis, based on a first principles modeling with an extremely broad international verification and validation data base. (Author)

  3. The case against a smoker's license.

    Directory of Open Access Journals (Sweden)

    Jeff Collin

    Full Text Available Tobacco continues to kill millions of people around the world each year and its use is increasing in some countries, which makes the need for new, creative, and radical efforts to achieve the tobacco control endgame vitally important. One such effort is discussed in this PLOS Medicine Debate, where Simon Chapman presents his proposal for a "smoker's license" and Jeff Collin argues against. Chapman sets out a case for introducing a smart card license for smokers designed to limit access to tobacco products and encourage cessation. Key elements of the smoker's license include smokers setting daily limits, financial incentives for permanent license surrender, and a test of health risk knowledge for commencing smokers. Collin argues against the proposal, saying that it would shift focus away from the real vector of the epidemic--the tobacco industry--and that by focusing on individuals it would censure victims, increase stigmatization of smokers, and marginalize the poor.

  4. The case for a smoker's license.

    Directory of Open Access Journals (Sweden)

    Simon Chapman

    Full Text Available BACKGROUND TO THE DEBATE: Tobacco continues to kill millions of people around the world each year and its use is increasing in some countries, which makes the need for new, creative, and radical efforts to achieve the tobacco control endgame vitally important. One such effort is discussed in this PLOS Medicine Debate, where Simon Chapman presents his proposal for a "smoker's license" and Jeff Collin argues against. Chapman sets out a case for introducing a smart card license for smokers designed to limit access to tobacco products and encourage cessation. Key elements of the smoker's license include smokers setting daily limits, financial incentives for permanent license surrender, and a test of health risk knowledge for commencing smokers. Collin argues against the proposal, saying that it would shift focus away from the real vector of the epidemic--the tobacco industry--and that by focusing on individuals it would censure victims, increase stigmatization of smokers, and marginalize the poor.

  5. The case for a smoker's license.

    Science.gov (United States)

    Chapman, Simon

    2012-01-01

    Tobacco continues to kill millions of people around the world each year and its use is increasing in some countries, which makes the need for new, creative, and radical efforts to achieve the tobacco control endgame vitally important. One such effort is discussed in this PLOS Medicine Debate, where Simon Chapman presents his proposal for a "smoker's license" and Jeff Collin argues against. Chapman sets out a case for introducing a smart card license for smokers designed to limit access to tobacco products and encourage cessation. Key elements of the smoker's license include smokers setting daily limits, financial incentives for permanent license surrender, and a test of health risk knowledge for commencing smokers. Collin argues against the proposal, saying that it would shift focus away from the real vector of the epidemic--the tobacco industry--and that by focusing on individuals it would censure victims, increase stigmatization of smokers, and marginalize the poor.

  6. The case against a smoker's license.

    Science.gov (United States)

    Collin, Jeff

    2012-01-01

    Tobacco continues to kill millions of people around the world each year and its use is increasing in some countries, which makes the need for new, creative, and radical efforts to achieve the tobacco control endgame vitally important. One such effort is discussed in this PLOS Medicine Debate, where Simon Chapman presents his proposal for a "smoker's license" and Jeff Collin argues against. Chapman sets out a case for introducing a smart card license for smokers designed to limit access to tobacco products and encourage cessation. Key elements of the smoker's license include smokers setting daily limits, financial incentives for permanent license surrender, and a test of health risk knowledge for commencing smokers. Collin argues against the proposal, saying that it would shift focus away from the real vector of the epidemic--the tobacco industry--and that by focusing on individuals it would censure victims, increase stigmatization of smokers, and marginalize the poor.

  7. A review of tritium licensing requirements

    International Nuclear Information System (INIS)

    Meikle, A.B.

    1982-12-01

    Present Canadian regulations and anticipated changes to these regulations relevant to the utilization of tritium in fusion facilities and in commercial applications have been reviewed. It is concluded that there are no serious licensing obstacles, but there are a number of requirements which must be met. A license will be required from Atomic Energy Control Board if Ontario Hydro tritium is to be applied by other users. A license is required from the Federal Government to export or import tritium. A licensed container will be required for the storage and shipping of tritium. The containers being designed by AECL and Ontario Hydro and which are currently being tested will adequately store and ship all of the Ontario Hydro tritium but are unnecessarily large for the small quantities required by the commercial tritium users. Also, some users may prefer to receive tritium in gaseous form. An additional, smaller container should be considered. The licensing of overseas fusion facilities for the use of tritium is seen as a major undertaking offering opportunities to Canadian Fusion Fuels Technology Project to undertake health, safety and environmental analysis on behalf of these facilities

  8. Licensing activities for advanced reactors in NNC

    International Nuclear Information System (INIS)

    Chevalier, A.B.H.; Mustoe, J.; Walters, J.; Ingham, E.L.

    2001-01-01

    NNC has been involved in safety and licensing activities for advanced reactors for many years. Most recently NNC has been involved with national regulators or their representatives for the HTR (High Temperature Reactor) reactor and the possible siting of ITER (International Thermonuclear Experimental Reactor) within Europe. Commonalties between the two activities can be seen, even though one is a fission process and the other based on a completely new technology. Both have the potential to generate power at a very low overall exposure to the public and station staff, but both also need to demonstrate to the regulator the safety of a design which differs from the standard LWR practice. In both concepts passive design features provide a major part of the safety argument, but the detailed assessment and justification of these features in licensing terms still needs to be made. A number of critical safety issues can be identified, which generally apply to any advanced system. These are: Safety categorization, codes and standards; confinement or containment; ALARA; safety code modelling and data; Occupational Exposure; occupational exposures; decommissioning and waste; no evacuation, or no emergency plans. The UK is notable for a flexible licensing regime, which allows a safety case to be built up from first principles, where this is applicable. In addition, experience of licensing gas cooled, water cooled and liquid metal plant, as well as extensive experience outside the UK provides NNC with a unique insight into the different licensing methodologies which can be applied in the licensing process. This paper discusses some possible approaches which could be applied in order to satisfy regulatory demands when addressing the critical issues listed above. (author)

  9. ABWR certification work brings US licensing stability nearer

    International Nuclear Information System (INIS)

    Wilkins, D.R.; Quirk, J.F.

    1991-01-01

    The Advanced Boiling Water Reactor (ABWR) is now approaching Final Design Approval by the US Nuclear Regulatory Commission (NRC) and will then proceed on to the certification phase of the NRC's new standard plant licensing process. Successful completion of this will usher in a new era of standardization and reactor licensing stability in the US. (author)

  10. The USNCR license renewal process

    International Nuclear Information System (INIS)

    Kuo, Pao-Tsin

    2002-01-01

    The US Congress promulgated a law in 1954, entitled 'Atomic Energy Act'. This Act states that operating licenses for commercial nuclear power plants are limited to a fixed term of 40 years, but they may be renewed for a period not to exceed 20 years. The terms were established mainly for economic considerations, not based on technical limitations. The U.S. Nuclear Regulatory Commission (USNRC) published the license renewal rule, Title 10 of the Code of Federal Regulations, Part 54 (10 CFR Part 54), in December, 1991. The rule has since been amended in May, 1995. The underlying principle of the rule is that the regulatory process is adequate for ensuring safety of operating plants. The regulatory process includes NRC's issuance of Orders, Bulletins, Generic Letters, and Information Notices, as well as a number of special inspections in addition to the continuous oversight and routine inspection activities performed by on-site inspectors. Because of this comprehensive regulatory process, compilation of the current license basis or re-verification of the current licensing basis is not considered necessary for a license renewal review. The USNRC also determined on the basis of the findings of its research programs that active structures and components are well maintained by the existing programs. Therefore, the focus of the license renewal review is on passive, long-lived structures and components and on time-limited ageing analyses. The time-limited ageing analyses are for those structures and components which were originally designed to a 40 year service life

  11. ISO 14000 and the nuclear licensing

    International Nuclear Information System (INIS)

    Martins, Nadia Soido Falcao

    1999-01-01

    As concern grows for maintaining and improving the quality of the environment and protecting human health, all the world is turning its attention to the potential environmental in pact of their industrial activities. One of the most important contribution in that way is the International Standard ISO 14000 series. In the utilization of nuclear energy, right from the inception, the safety of personnel, environment and the population has been the basic consideration. Over the years well established licenses criteria have been proposed to limit and control the environmental impact of the plant operation and emergencies situation. In this paper are discussed some specific requirements for implementation of the environmental management system specified by ISO 14000 compared to the environmental requirements for nuclear licensing. (author)

  12. Reactor licensing process: a status report

    International Nuclear Information System (INIS)

    Long, J.A.

    1977-01-01

    The Nuclear Regulatory Commission (NRC), in its review of applications for licenses to construct and operate nuclear power plants, is required to consider those measures necessary to ensure the protection of the health and safety of the public and the environment. The article discusses the NRC staff procedures and policies for conducting the detailed safety, environmental, and antitrust reviews that provide the basis for these assurances. Included is a discussion of the improvements to the licensing process currently being proposed or implemented to enhance its stability and predictability for the benefit of all involved with the regulation of nuclear power. The views and opinions expressed in the article are those of the author alone and do not represent positions of the NRC

  13. Perception survey on the introduction of clinical performance examination as part of the national nursing licensing examination in Korea

    Directory of Open Access Journals (Sweden)

    Su Jin Shin

    2017-10-01

    Full Text Available Purpose The purpose of this study was to analyze opinions about the action plan for implementation of clinical performance exam as part of the national nursing licensing examination and presents the expected effects of the performance exam and aspects to consider regarding its implementation. Methods This study used a mixed-methods design. Quantitative data were collected by a questionnaire survey, while qualitative data were collected by focus group interviews with experts. The survey targeted 200 nursing professors and clinical nurses with more than 5 years of work experience, and the focus group interviews were conducted with 28 of professors, clinical instructors, and nurses at hospitals. Results First, nursing professors and clinical specialists agreed that the current written tests have limitations in evaluating examinees’ ability, and that the introduction of a clinical performance exam will yield positive results. Clinical performance exam is necessary to evaluate and improve nurses’ work ability, which means that the implementation of a performance exam is advisable if its credibility and validity can be verified. Second, most respondents chose direct performance exams using simulators or standardized patients as the most suitable format of the test. Conclusion In conclusion, the current national nursing licensing exam is somewhat limited in its ability to identify competent nurses. Thus, the time has come for us to seriously consider the introduction of a performance exam. The prerequisites for successfully implementing clinical performance exam as part of the national nursing licensing exam are a professional training process and forming a consortium to standardize practical training.

  14. On HTML and XML based web design and implementation techniques

    International Nuclear Information System (INIS)

    Bezboruah, B.; Kalita, M.

    2006-05-01

    Web implementation is truly a multidisciplinary field with influences from programming, choosing of scripting languages, graphic design, user interface design, and database design. The challenge of a Web designer/implementer is his ability to create an attractive and informative Web. To work with the universal framework and link diagrams from the design process as well as the Web specifications and domain information, it is essential to create Hypertext Markup Language (HTML) or other software and multimedia to accomplish the Web's objective. In this article we will discuss Web design standards and the techniques involved in Web implementation based on HTML and Extensible Markup Language (XML). We will also discuss the advantages and disadvantages of HTML over its successor XML in designing and implementing a Web. We have developed two Web pages, one utilizing the features of HTML and the other based on the features of XML to carry out the present investigation. (author)

  15. Licensing of ANSTO's Replacement Research Reactor

    International Nuclear Information System (INIS)

    Summerfield, M.W.; Garea, V.

    2003-01-01

    This paper presents a general description of the licensing of the 20 MW Pool-type Replacement Research Reactor (RRR) currently being built by the Australian Nuclear Science and Technology Organisation (ANSTO) at their Lucas Heights site. The following aspects will be addressed: 1) The influence of ARPANSA's (the Australian regulator) Regulatory Assessment Principles and Design Criteria on the design of the RRR. 2) The Site Licence Application, including the EIS and the supporting siting documentation. 3) The Construction Licence Application, including the PSAR and associated documentation. 4) The review process, including the IAEA Peer Review and the Public Submissions as well as ARPANSA's own review. 5) The interface between ANSTO, INVAP and ARPANSA in relation to the ongoing compliance with ARPANS Regulation 51 and 54. 6) The future Operating Licence Application, including the draft FSAR and associated documentation. These aspects are all addressed from the point of view of the licensee ANSTO and the RRR Project. Particular emphasis will be given to the way in which the licensing process is integrated into the overall project program and how the licensing and regulatory regime within Australia influenced the design of the RRR. In particular, the safety design features that have been incorporated as a result of the specific requirements of ANSTO and the Australian regulator will be briefly described. The paper will close with a description of how the RRR meets, and in many aspects exceeds the requirements of ANSTO and the Australian regulator. (author)

  16. Implementing Sustainability Considerations in Packaging Design Curricula

    NARCIS (Netherlands)

    Mulder-Nijkamp, Maaike; de Koeijer, Bjorn; Torn, Isaäc Anthony Robbert-Jan

    2018-01-01

    This study aims to address the structured implementation of sustainability considerations in packaging design processes by proposing a teaching framework for design students. The framework builds upon a four-year research program which aims to deliver insights regarding the environmental burden

  17. DESIGN AND IMPLEMENTATION OF CONVEYOR LINE SPEED ...

    African Journals Online (AJOL)

    DESIGN AND IMPLEMENTATION OF CONVEYOR LINE SPEED SYNCHRONISER FOR INDUSTRIAL CONTROL APPLICATIONS: A CASE STUDY OF ... in bottles.Therefore a Proportional Integral Derivative(PID) controller was designed to act as a speed synchronizer in order to eliminate the above mentioned problems.

  18. A Malaysian Vehicle License Plate Localization and Recognition System

    Directory of Open Access Journals (Sweden)

    Ganapathy Velappa

    2008-02-01

    Full Text Available Technological intelligence is a highly sought after commodity even in traffic-based systems. These intelligent systems do not only help in traffic monitoring but also in commuter safety, law enforcement and commercial applications. In this paper, a license plate localization and recognition system for vehicles in Malaysia is proposed. This system is developed based on digital images and can be easily applied to commercial car park systems for the use of documenting access of parking services, secure usage of parking houses and also to prevent car theft issues. The proposed license plate localization algorithm is based on a combination of morphological processes with a modified Hough Transform approach and the recognition of the license plates is achieved by the implementation of the feed-forward backpropagation artificial neural network. Experimental results show an average of 95% successful license plate localization and recognition in a total of 589 images captured from a complex outdoor environment.

  19. Pro SQL Server 2012 relational database design and implementation

    CERN Document Server

    Davidson, Louis

    2012-01-01

    Learn effective and scalable database design techniques in a SQL Server environment. Pro SQL Server 2012 Relational Database Design and Implementation covers everything from design logic that business users will understand, all the way to the physical implementation of design in a SQL Server database. Grounded in best practices and a solid understanding of the underlying theory, Louis Davidson shows how to "get it right" in SQL Server database design and lay a solid groundwork for the future use of valuable business data. Gives a solid foundation in best practices and relational theory Covers

  20. License renewal

    International Nuclear Information System (INIS)

    Newberry, S.

    1993-01-01

    This article gives an overview of the process of license renewal for nuclear power plants. It explains what is meant by license renewal, the significance of license renewal, and goes over key elements involved in the process of license renewal. Those key elements are NRC requirements embodied in 10 CFR Part 54 (Reactor Safety) and 10 CFR Part 51 (Environmental Issues). In addition Industry Reports must be developed and reviewed. License renewal is essentially the process of applying for a 20 year extension to the original 40 year operating license granted for the plant. This is a very long term process, which involves a lot of preparation, and compliance with regulatory rules and guidelines. In general it is a process which is expected to begin when plants reach an operating lifetime of 20 years. It has provisions for allowing the public to become involved in the review process

  1. Nuclear power plant licensing in Canada

    International Nuclear Information System (INIS)

    Tong, J.S.C.; Waddington, J.G.

    1997-01-01

    The Canadian nuclear power plant licensing practice which has evolved over three decades provides a regulatory framework that promotes safe design and operation of CANDU power plants. From the very outset, it recognizes the need for simple and reliable safety systems which are separate from the systems that are normally used to produce electricity. Further, it requires the reliability of safety systems be demonstrated by routine tests during plant operation. Over the three decades, the analysis requirements to demonstrate the performance and reliability of plant systems that have a role in the detection and mitigating of accidents have also evolved. Today's requirements are defined in consultative documents C-6 and C-98. One recurring theme throughout the evolution of the licensing practice is the maxim of prescribing only basic safety requirements and rules so that designers and operators have the freedom to devise the best possible design features and operating practices

  2. Management of spent fuel from power and research reactors using CASTOR and CONSTOR casks and licensing experience worldwide

    International Nuclear Information System (INIS)

    Becher, D.

    2003-01-01

    An overview of the spent fuel storage in CASTOR and CONSTOR casks during the last 30 years is made. Design characteristics of the both types of casks are presented. CASTOR casks fulfill both the requirements for type B packages according to the IAEA requirements covering different accident situations in storage sites. Analyses of nuclear and thermal behavior and strength are carried out for CONSTOR concept. Special experimental program for verification of mechanical and thermomechanical properties is implemented. Licensing experience of the casks in German storage facilities is presented. Special modifications of CASTOR casks for WWER-440 and RBMK fuel assemblies have been designed for implementation in Eastern Europe. Contracts for GNB spent fuel casks delivery are concluded with Czech Republic, Slovakia, Hungary and Lithuania

  3. Effectiveness-implementation hybrid designs: combining elements of clinical effectiveness and implementation research to enhance public health impact.

    Science.gov (United States)

    Curran, Geoffrey M; Bauer, Mark; Mittman, Brian; Pyne, Jeffrey M; Stetler, Cheryl

    2012-03-01

    This study proposes methods for blending design components of clinical effectiveness and implementation research. Such blending can provide benefits over pursuing these lines of research independently; for example, more rapid translational gains, more effective implementation strategies, and more useful information for decision makers. This study proposes a "hybrid effectiveness-implementation" typology, describes a rationale for their use, outlines the design decisions that must be faced, and provides several real-world examples. An effectiveness-implementation hybrid design is one that takes a dual focus a priori in assessing clinical effectiveness and implementation. We propose 3 hybrid types: (1) testing effects of a clinical intervention on relevant outcomes while observing and gathering information on implementation; (2) dual testing of clinical and implementation interventions/strategies; and (3) testing of an implementation strategy while observing and gathering information on the clinical intervention's impact on relevant outcomes. The hybrid typology proposed herein must be considered a construct still in evolution. Although traditional clinical effectiveness and implementation trials are likely to remain the most common approach to moving a clinical intervention through from efficacy research to public health impact, judicious use of the proposed hybrid designs could speed the translation of research findings into routine practice.

  4. The Licensing of New Nuclear Power Plants in Europe

    International Nuclear Information System (INIS)

    Raetzke, C.

    2008-01-01

    After an introduction dealing with the nuclear Renaissance in Europe and the specific situation of Germany and of Italy, the article focuses on the question of licensing processes for new reactors. New nuclear power plant projects involve a substantial investment and electric utilities will only take this decision if the licensing and regulatory risk can be adequately managed. Licensing processes should be predictable and efficient in order to give sufficient assurance to applicants. The article discusses best practice in licensing by giving some examples of suitable licensing processes of other countries. It also highlights international initiatives aimed at harmonizing safety requirements for new reactors and a multinational cooperation in reactor design review. These issues should be carefully considered by any country wanting to get new nuclear started. [it

  5. Implementing Target Value Design.

    Science.gov (United States)

    Alves, Thais da C L; Lichtig, Will; Rybkowski, Zofia K

    2017-04-01

    An alternative to the traditional way of designing projects is the process of target value design (TVD), which takes different departure points to start the design process. The TVD process starts with the client defining an allowable cost that needs to be met by the design and construction teams. An expected cost in the TVD process is defined through multiple interactions between multiple stakeholders who define wishes and others who define ways of achieving these wishes. Finally, a target cost is defined based on the expected profit the design and construction teams are expecting to make. TVD follows a series of continuous improvement efforts aimed at reaching the desired goals for the project and its associated target value cost. The process takes advantage of rapid cycles of suggestions, analyses, and implementation that starts with the definition of value for the client. In the traditional design process, the goal is to identify user preferences and find solutions that meet the needs of the client's expressed preferences. In the lean design process, the goal is to educate users about their values and advocate for a better facility over the long run; this way owners can help contractors and designers to identify better solutions. This article aims to inform the healthcare community about tools and techniques commonly used during the TVD process and how they can be used to educate and support project participants in developing better solutions to meet their needs now as well as in the future.

  6. Licensing process characteristics of Small Modular Reactors and spent nuclear fuel repository

    Energy Technology Data Exchange (ETDEWEB)

    Söderholm, Kristiina, E-mail: kristiina.soderholm@fortum.com [Fortum Power (Finland); Tuunanen, Jari, E-mail: jari.tuunanen@fortum.com [Fortum Power (Finland); Amaba, Ben, E-mail: baamaba@us.ibm.com [IBM Complex Systems (United States); Bergqvist, Sofia, E-mail: sofia.bergqvist@se.ibm.com [IBM Rational Software (Sweden); Lusardi, Paul, E-mail: plusardi@nuscalepower.com [NuScale Power (United States)

    2014-09-15

    Highlights: • We examine the licensing process challenges of modular nuclear facilities. • We compare the features of Small Modular Reactors and spent nuclear fuel repository. • We present the need of nuclear licensing simplification. • Part of the licensing is proposed to be internationally applicable. • Systems engineering and requirements engineering benefits are presented. - Abstract: This paper aims to increase the understanding of the licensing processes characteristics of Small Modular Reactors (SMR) compared with licensing of spent nuclear fuel repository. The basis of the SMR licensing process development lies in licensing processes used in Finland, France, the UK, Canada and the USA. These countries have been selected for this study because of their various licensing processes and recent actions in the new NPP construction. Certain aspects of the aviation industry licensing process have also been studied and selected practices have been investigated as possibly suitable for use in nuclear licensing. Suitable features for SMR licensing are emphasized and suggested. The licensing features of the spent nuclear fuel deep repository along with similar features of SMR licensing are discussed. Since there are similar types of challenges of lengthy licensing time frames, as well as modular features to be taken into account in licensing, these two different nuclear industry fields can be compared. The main SMR features to take into account in licensing are: • Standardization of the design. • Modularity. • Mass production. • Serial construction. Modularity can be divided into two different categories: the first category is simply a single power plant unit constructed of independently engineered modules (e.g. construction process for Westinghouse AP-1000 NPP) and the second one a power plant composed of many reactor modules, which are manufactured in factories and installed as needed (e.g. NuScale Power SMR design). The deep underground repository

  7. New Reactor Siting, Licensing and Construction Experience. Proceedings of the 2. CNRA International Workshop on 'New Reactor Siting, Licensing and Construction Experience'

    International Nuclear Information System (INIS)

    2013-01-01

    This report documents the proceedings from the 2. Workshop on New Reactor Siting, Licensing and Construction Experience. A total of 45 specialists from 16 countries and international organisations attended. The meeting was sponsored by the OECD Nuclear Energy Agency Committee on Nuclear Regulatory Activities and hosted by the US Nuclear Regulatory Commission (U.S.NRC). The objectives of the workshop were to provide a forum to exchange information on lessons learned from siting, licensing and constructing new nuclear power plants around the world. Key focus areas included siting practices and regulatory positions that have been enhanced as a result of the Fukushima accident; lessons learned from licensing and design review approaches and challenges, construction experience and recommendations for regulatory oversight; and regulatory cooperation on generic and design specific issues through the MDEP specific working groups. The workshop was structured in 4 technical sessions, each followed by ample time for panel discussions. The first technical session was devoted to regulatory cooperation on generic and design specific issues, MDEP working groups (EPR, AP1000), vendor inspection co-operation, digital I and C, and codes and standards. The second technical session was intended to discuss and share regulatory positions on siting practices and enhancements as a result of lessons learned from Fukushima accident. The third technical session addressed the construction experience and regulatory oversight of new reactor construction activities. And the fourth technical session included presentations on the lessons learned from regulatory licensing reviews of new reactor designs

  8. Operating reactors licensing actions summary. Volume 5, No. 9

    International Nuclear Information System (INIS)

    1985-11-01

    This document is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Resource Management

  9. Operating reactors licensing actions summary. Volume 5, No. 8

    International Nuclear Information System (INIS)

    1985-10-01

    This summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Resource Management

  10. Operating reactors licensing actions summary. Volume 4, No. 9

    International Nuclear Information System (INIS)

    1984-11-01

    This document is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the division of licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Resource Management

  11. Operating reactors licensing actions summary. Vol. 4, No. 2

    International Nuclear Information System (INIS)

    1984-04-01

    This summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Resource Management

  12. Protocol design and implementation using formal methods

    NARCIS (Netherlands)

    van Sinderen, Marten J.; Ferreira Pires, Luis; Pires, L.F.; Vissers, C.A.

    1992-01-01

    This paper reports on a number of formal methods that support correct protocol design and implementation. These methods are placed in the framework of a design methodology for distributed systems that was studied and developed within the ESPRIT II Lotosphere project (2304). The paper focuses on

  13. Siting Practices and Site Licensing Process for New Reactors in Canada

    International Nuclear Information System (INIS)

    Vos, Marcel de

    2011-01-01

    'Siting' in Canada is composed of Site Evaluation and Site Selection. As outlined in CNSC Regulatory Document RD-346 Site Evaluation for New Nuclear Power Plants (based on IAEA NS-R-3), prior to the triggering of the Environmental Assessment (EA) and licensing processes, the proponent is expected to use a robust process to characterize proposed sites over the full life cycle of the facility, and then develop a fully documented defense of the site selection case. This case forms the backbone for submissions in support of the EA and the application for a License to Prepare Site which will be reviewed by the CNSC and other applicable federal authorities. The Environmental Assessment process and License to Prepare Site in Canada do not require a proponent to select a specific design; however, CNSC does not accept a 'black box' approach to siting. CNSC balances the level of design information required with the extent of safety assurance desired for any designs being contemplated for the proposed site. Nevertheless, the design information submitted must be sufficient to justify the site as suitable for all future licensing stages. The depth of plant design information contributes significantly to the credibility of the applicant's case for both the EA and application for License to Prepare Site. The review process utilizes an assessment plan with defined review stages and timelines. The outcome of these reviews is a series of recommendations to a federal government appointed Joint Review Panel (which also serves as a panel of the 'Commission') which, following public hearings, renders a decision regarding the EA, and subsequently, the application for a License to Prepare Site. (author)

  14. Judicial problems in connection with preliminary decision and construction design approval in nuclear licensing procedures

    International Nuclear Information System (INIS)

    Schmieder, K.

    1977-01-01

    Standardization in nuclear engineering makes two demands on a legal instrument which is to make this standardization possible and which is to promote standardization in the nuclear licensing practice: On the basis of just one licence for a constructional part or a component, its applicability in any number of subsequent facility licensing procedures has to be warranted, and by virtue of its binding effect, standardization has to create a sufficiently big confidence protection with manufacturers, constructioneers and operators to offer sufficiently effective incentives for standardization. The nuclear preliminary decision pursuant to section 7 a of the Atomic Energy Act in the form of the component preliminary decision appears to be unsuitable as a legal instrument for standardization, as the preliminary decision refers exclusively to the construction of a concrete facility. For standardization in reactor engineering, the construction design approval appears to be basically the proper legal instrument on account of its legal structure as well as its economic effect. Its binding effect encouters a limitation with regard to third parties in so far that this limitation could question again the binding effect in a subsequent site-dependent nuclear licence procedure. The legal structure of the extent of the binding effect, which is decisive for the suitability of the construction design approval, lies with the legislator. The following questions have to be regulated: Ought the applicant to have a legal claim on the granting of a construction design approval, or ought it to be at the discretion of the authorities, and secondly, the extent of the binding effect in terms of time on the basis of the fixation of a time limit, or on the basis of the possibility of subsequent conditions to be imposed, or the revocation. (orig./HP) [de

  15. Wireless multimedia communication systems design, analysis, and implementation

    CERN Document Server

    Rao, KR; Bakmaz, Bojan M

    2014-01-01

    Rapid progress in software, hardware, mobile networks, and the potential of interactive media poses many questions for researchers, manufacturers, and operators of wireless multimedia communication systems. Wireless Multimedia Communication Systems: Design, Analysis, and Implementation strives to answer those questions by not only covering the underlying concepts involved in the design, analysis, and implementation of wireless multimedia communication systems, but also by tackling advanced topics such as mobility management, security components, and smart grids.Offering an accessible treatment

  16. International Harmonization of Reactor Licensing Regulations

    International Nuclear Information System (INIS)

    Kuhnt, Dietmar.

    1977-01-01

    The purpose of a harmonization policy for reactor licensing regulations on the basis of already considerable experience is to attain greater rationalisation in this field, in the interest of economic policy and healthy competition, and most important, radiation protection and safety of installations. This paper considers the legal instruments for such harmonization and the conditions for their implementation, in particular within the Communities framework. (NEA) [fr

  17. Design and Implementation of the MESH Services Platform

    NARCIS (Netherlands)

    Batteram, Harold J.; Bakker, John-Luc; Verhoosel, Jack P.C.; Diakov, N.K.

    1999-01-01

    Industry acceptance of TINA (Telecommunications Information Networking Architecture) will depend heavily on both the evaluation of working systems that implement this architecture, and on the experiences obtained during the design and implementation of these systems. During the MESH' (Multimedia

  18. Lessons learned from the licensing process and the operational performance of the important to safety digital application implemented at the Mexican nuclear facilities

    International Nuclear Information System (INIS)

    Ledesma-Carrion, R.

    1998-01-01

    This paper describes the main concerns detected during the licensing processes performed by the Mexican Nuclear Regulatory Commission (CNSNS) for the NUMAC-PRNM, the Integrated Computer Systems at the Laguna Verde Nuclear Power Station (LVNPS) and for the Digital Control Console of the Triga Mark III Research Reactor (TMRR). The review and approval process was performed following the guidelines of the US Nuclear Regulatory Commission (USNRC); the regulatory frame applied includes the Code of Federal Regulation (10CFR50), some Regulatory Guides, such as: RG 1.152, RG 1.153, some Industrial Standards, for example: IEEE-279, IEEE-603, IEEE-7.4.3-2. Also, based on the operational experience taken from the LVNPS License Event Report (LER) reported under the 10CFR50.72 and 10CFR50.73 USNRC rules, and from the Report of Events to be Analyzed (REA) issued for a CNSNS agreement with the utility stated by the necessity to determine failure rates of digital equipment, some case studies and a preliminary failure cause classification is shown. The Event Report evaluation covered topics related to the software, hardware and firmware issues. Finally, the lessons learned from the licensing assessments and from the operational experience of the digital applications implemented are presented. It will also give the regulatory activities related to an IAEA international cooperation project on I and C digital upgrade concerns. (author)

  19. The design and implementation of the LLNL gigabit testbed

    Energy Technology Data Exchange (ETDEWEB)

    Garcia, D. [Lawrence Livermore National Labs., CA (United States)

    1994-12-01

    This paper will look at the design and implementation of the LLNL Gigabit testbed (LGTB), where various high speed networking products, can be tested in one environment. The paper will discuss the philosophy behind the design of and the need for the testbed, the tests that are performed in the testbed, and the tools used to implement those tests.

  20. Design and implementation of organic LED-based displays for signage application

    Science.gov (United States)

    Sharma, Pratibha; Kwok, Harry

    2006-06-01

    Organic light-emitting diodes (OLEDs) have been utilized successfully for various applications such as microdisplays in cell-phones and digital cameras. However, the application of OLEDs for large area signage displays has not yet been established. This paper presents novel design techniques for implementing OLEDs as light sources for signage application. The designs are examined on the basis of signage uniformity, cost and manufacturing complexity. Advantages and limitations of each design are described. It is determined that a trade-off is required to choose a design for implementation. After evaluation and comparison of the designs, the most optimal design is chosen and implemented. Measurement results with the optimal design are described.

  1. Licensing of advanced reactors: Status report and perspective

    International Nuclear Information System (INIS)

    King, T.

    1988-01-01

    In July, 1986, the U.S. Nuclear Regulatory Commission issued a Policy State on the Regulation of Advanced Nuclear Power Plants. As part of this policy, advanced reactor designers were encouraged to interact with NRC [Nuclear Regulatory Commission] early in the design process to obtain feedback regarding licensing requirements for advanced reactors. Accordingly, the staff has been interacting with the Department of Energy (DOE) and its contractors on the review of three advanced reactor conceptual designs: one modular high temperature gas-cooled reactor (MHTGR) and two liquid metal reactors (LMRs). This paper provides a status of the NRC review effort, describes the key policy and technical issues resulting from our review and provides the current status and approach to the development of licensing guidance on each

  2. Challenges in licensing a sodium-cooled advanced recycling reactor

    International Nuclear Information System (INIS)

    Levin, Alan E.

    2008-01-01

    As part of the Global Nuclear Energy Partnership (GNEP), the U.S. Department of Energy (DOE) has focused on the use of sodium-cooled fast reactors (SFRs) for the destruction of minor actinides derived from used reactor fuel. This approach engenders an array of challenges with respect to the licensing of the reactor: the U.S. Nuclear Regulatory Commission (NRC) has never completed the review of an application for an operating license for a sodium-cooled reactor. Moreover, the current U.S. regulatory structure has been developed to deal almost exclusively with light-water reactor (LWR) designs. Consequently, the NRC must either (1) develop a new regulatory process for SFRs, or (2) reinterpret the existing regulations to apply them, as appropriate, to SFR designs. During the 1980s and 1990s, the NRC conducted preliminary safety assessments of the Sodium Advanced Fast Reactor (SAFR) and the Power Reactor Innovative Small Module (PRISM) designs, and in that context, began to consider how to apply LWR-based regulations to SFR designs. This paper builds on that work to consider the challenges, from the reactor designer's point of view, associated with licensing an SFR today, considering (1) the evolution of SFR designs, (2) the particular requirements of reactor designs to meet GNEP objectives, and (3) the evolution of NRC regulations since the conclusion of the SAFR and PRISM reviews. (author)

  3. BWR containments license renewal industry report; revision 1. Final report

    International Nuclear Information System (INIS)

    Smith, S.; Gregor, F.

    1994-07-01

    The U.S. nuclear power industry, through coordination by the Nuclear Management and Resources Council (NUMARC), and sponsorship by the U.S. Department of Energy (DOE) and the Electric Power Research Institute (EPRI), has evaluated age-related degradation effects for a number of major plant systems, structures, and components, in the license renewal technical Industry Reports (IR's). License renewal applicants may choose to reference these IR's in support of their plant-specific license renewal applications as an equivalent to the integrated plant assessment provisions of the license renewal rule (IOCFR54). The scope of the IR provides the technical basis for license renewal for U.S. Boiling Water Reactor (BWR) containments. The scope of the report includes containments constructed of reinforced or prestressed concrete with steel liners and freestanding stell containments. Those domestic BWR containments designated as Mark I, Mark II or Mark III are covered, but no containments are addressed before these designs. The report includes those items within the jurisdictional boundaries for metal and concrete containments defined by Section III of the ASME Boiler and Pressure Vessel Code, Division 1, Subsection NE (Class MC) and Division 2 (Class CC) and their supports, but excluding snubbers

  4. Development of radioactive waste management licensing review assistant

    International Nuclear Information System (INIS)

    Loa, W.W.; Chen, S.; Yu, W.C.; Peng, C.M.; Huang, C.L.; Lin, C.

    1992-01-01

    Regulations on radioactive waste disposal are now in urgent need due to our increasing consumption of electric power from nuclear origin. It is set forth that actually applying the regulations to evaluate the license application of new repositories for interim storage and final disposal fo High-Level Waste and Low-Level Waste before the year of 2000. In the mean time, it is expected to establish the basis for the decision on issuing the license. The license review procedure can be very complicated because too many factors must be taken into consideration. However, to maintain a more efficient, accurate, and systematic review procedure, and at the same time to reduce costs, the Artificial Intelligence (AI) techniques may be used. An expert system is designed as a radioactive waste management licensing review aid for the staff those are in charge of the license application. Tasks such as completeness checking, functional areas of review distribution, participation confirmation, knowledge acquisition, review comment collection, weighting calculation, and degree of satisfaction are considered. In this paper the authors will discuss the development of the radioactive waste management licensing review assistant

  5. Design and Implementation of an Extensible Learner-Adaptive Environment

    Directory of Open Access Journals (Sweden)

    Kiyoshi Nakabayashi

    2010-09-01

    Full Text Available This paper describes the design and implementation of a flexible architecture that is capable of extending the functions of a learner-adaptive self-learning environment. A “courseware object”, which is a program module that is used to implement various educational functionalities, has been newly introduced to ensure both function extensibility as well as content reusability. A prototype system was designed and implemented to investigate the feasibility of the proposed architecture and to identify the core behavior and interaction schema of courseware objects. The results from this trial indicated that several learner-adaptive functionalities including the SCORM 2004 standard specifications will be able to be successfully implemented into the proposed architecture.

  6. NUPLEX Licensing Subcommittee

    International Nuclear Information System (INIS)

    Edwards, D.W.; Allen, S.R.

    1988-01-01

    The NUPLEX Licensing Subcommittee was organized to seek a formal license renewal mechanism that institutionalizes the current licensing basis and consequent level of safety of a plant as the legitimate standard for acceptance and approval of an application for extended operation. Along with defining the most workable approach to and scope of review for license renewal, this paper explains the reasons why a regulatory framework is needed by the early 1990s. The initial results of development work on two key issues, licensing criteria and hearing process, are also presented. at this point six potential license renewal criteria have emerged: evaluation of existing monitoring/maintenance programs, revalidation of current licensing basis, conformance to special regulations, evaluation to a safety goal, plant performance history, and environmental assessment. The work on a hearing process has led to the development of two models for future consideration: hybrid legislative and hybrid adjudicatory

  7. Designing, Implementing, and Evaluating Secure Web Browsers

    Science.gov (United States)

    Grier, Christopher L.

    2009-01-01

    Web browsers are plagued with vulnerabilities, providing hackers with easy access to computer systems using browser-based attacks. Efforts that retrofit existing browsers have had limited success since modern browsers are not designed to withstand attack. To enable more secure web browsing, we design and implement new web browsers from the ground…

  8. Application of ASP Technology to Realize the Online Administrative License of the earthquake in Hunan Province

    Science.gov (United States)

    Tang, Hongliang; Kang, Chengxu; Tian, Youping

    2018-01-01

    Realizing the online handling of administrative approval of earthquakes is an important measure to improve work efficiency and facilitate people’s convenience. Based on the analysis of the characteristics and processes of the administrative licensing in the earthquake industry, this paper proposes an online processing model based on ASP technology and an online processing system based on B/S architecture. This paper presents the design and implementation methods. The application of the system shows that the system is simple in design and full in function, and can be used on mobile platforms such as computers and mobile phones, and has good practicability and forward-lookingness.

  9. Design Based Research: the Way of Developing and Implementing Educational Innovation

    Directory of Open Access Journals (Sweden)

    Tina Štemberger

    2016-11-01

    Full Text Available The appropriate implementation of innovation is a crucial factor in improving educational practice. In the implementation process, there is, however, often a lack of interaction between designers and practitioners that would enable the latter to become competent enough to implement theoretical knowledge into practice and to have an ongoing support from designers. Design-based research is based on close cooperation between researchers, practitioners and designers which consequently allows greater integration of research and practice in education. In the present paper, the beginnings, development, basic characteristics, advantages, disadvantages and the research process of design-based research are reviewed and an example of design-based research is presented.

  10. Benchmark for license plate character segmentation

    Science.gov (United States)

    Gonçalves, Gabriel Resende; da Silva, Sirlene Pio Gomes; Menotti, David; Shwartz, William Robson

    2016-09-01

    Automatic license plate recognition (ALPR) has been the focus of many researches in the past years. In general, ALPR is divided into the following problems: detection of on-track vehicles, license plate detection, segmentation of license plate characters, and optical character recognition (OCR). Even though commercial solutions are available for controlled acquisition conditions, e.g., the entrance of a parking lot, ALPR is still an open problem when dealing with data acquired from uncontrolled environments, such as roads and highways when relying only on imaging sensors. Due to the multiple orientations and scales of the license plates captured by the camera, a very challenging task of the ALPR is the license plate character segmentation (LPCS) step, because its effectiveness is required to be (near) optimal to achieve a high recognition rate by the OCR. To tackle the LPCS problem, this work proposes a benchmark composed of a dataset designed to focus specifically on the character segmentation step of the ALPR within an evaluation protocol. Furthermore, we propose the Jaccard-centroid coefficient, an evaluation measure more suitable than the Jaccard coefficient regarding the location of the bounding box within the ground-truth annotation. The dataset is composed of 2000 Brazilian license plates consisting of 14000 alphanumeric symbols and their corresponding bounding box annotations. We also present a straightforward approach to perform LPCS efficiently. Finally, we provide an experimental evaluation for the dataset based on five LPCS approaches and demonstrate the importance of character segmentation for achieving an accurate OCR.

  11. Analysis of license renewal at U.S. Nuclear Power Plants

    International Nuclear Information System (INIS)

    Nagayama, Munehiro

    2017-01-01

    The U.S. NRC had implemented the rules for LR (License Renewal) of NPPs (Nuclear Power Plants) and the LR rules allow plus 20-year operation of NPPs adding to initial 40-year term for reactor license. The U.S. NRC has already issued ROL (Renewed Operating License) for over forty NPPs. The Atomic Energy Act do not limit the number of LR, so the fleet of U.S. Nuclear, including agency, industry and academy, is continuing efforts to develop rules for SLR (Subsequent License Renewal). The framework of SLR rules has been developed and there is a plan of implementation of SLR for a pilot plant on FY 2018. The total operating term of a SLR plant is 80-year. The LR/SLR of NPPs is effective for stable power supply, greenhouse gas suppression, maintenance of technology, and securing employment. These profits will return to society. It is important to maintain required function of SSCs (Structure, System, and Components) for period of long term operation of NPPs. The U.S. fleet has established integrated ageing management strategy and each NPPs is developing their maintenance plans for long term operation. These adequate maintenance plans may enable to achieve good capacity factor of LR applied NPPs. In this report, domestic LR position will be considered by referring the good performance of U.S. NPPs which entered long term operation beyond 40-year and some conditions such as energy security. (author)

  12. NRC Licensing Status Summary Report for NGNP

    Energy Technology Data Exchange (ETDEWEB)

    Moe, Wayne Leland [Idaho National Lab. (INL), Idaho Falls, ID (United States); Kinsey, James Carl [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-11-01

    The Next Generation Nuclear Plant (NGNP) Project, initiated at Idaho National Laboratory (INL) by the U.S. Department of Energy (DOE) pursuant to provisions of the Energy Policy Act of 2005, is based on research and development activities supported by the Department of Energy Generation IV Nuclear Energy Systems Initiative. The principal objective of the NGNP Project is to support commercialization of high temperature gas-cooled reactor (HTGR) technology. The HTGR is a helium-cooled and graphite moderated reactor that can operate at temperatures much higher than those of conventional light water reactor (LWR) technologies. The NGNP will be licensed for construction and operation by the Nuclear Regulatory Commission (NRC). However, not all elements of current regulations (and their related implementation guidance) can be applied to HTGR technology at this time. Certain policies established during past LWR licensing actions must be realigned to properly accommodate advanced HTGR technology. A strategy for licensing HTGR technology was developed and executed through the cooperative effort of DOE and the NRC through the NGNP Project. The purpose of this report is to provide a snapshot of the current status of the still evolving pre-license application regulatory framework relative to commercial HTGR technology deployment in the U.S. The following discussion focuses on (1) describing what has been accomplished by the NGNP Project up to the time of this report, and (2) providing observations and recommendations concerning actions that remain to be accomplished to enable the safe and timely licensing of a commercial HTGR facility in the U.S.

  13. 78 FR 14126 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses...

    Science.gov (United States)

    2013-03-04

    ... in accordance with the Commission's ``Rules of Practice for Domestic Licensing Proceedings'' in 10... of the document. The E-Filing system also distributes an email notice that provides access to the... Completion Time has no impact on the consequences of any design basis accident since the consequences of an...

  14. Development of radioactive waste management licensing review assistant

    International Nuclear Information System (INIS)

    Wei-Whua Loa; Suan Chen; Wei-Chu Yu

    1992-01-01

    Regulations on radioactive waste disposal are now in urgent need due to our increasing consumption of electric power from nuclear origin. It is set forth that actually applying the regulations to evaluate the license application of new repositories for interim storage and final disposal of High-Level Waste and Low-Level Waste before the year of 2000. In the mean time, it is expected to establish the basis for the decision on issuing the license. The license review procedure can be very complicated, because too many factors must be taken into consideration. For the time being, licensing review is as much an art as it is a science. The authority usually faces three major problems; (1) the availability of domain expert, (2) maintaining of high quality and consistent reviews, and (3) the documentation of the review process. However, to maintain a more efficient, accurate, and systematic review procedure, and at the same time to reduce costs, the Artificial Intelligence (AI) techniques may be used. An expert system is designed as a radioactive waste management licensing review aid for the staff those are in charge of the license application. Tasks such as completeness checking, functional areas of review distribution, participation confirmation, knowledge acquisition, review comment collection, weighting calculation, and degree of satisfaction are considered. In this paper we will discuss the development of the radioactive waste management licensing review assistant

  15. Safety aspects of nuclear plant licensing in Canada

    International Nuclear Information System (INIS)

    Jennekens, J.H.F.

    1975-01-01

    The legislative authority is laid down in the Atomic Energy Control Act, 1946, declaring atomic energy a matter of national interest and establishing the Atomic Energy Control Board (AECB) as the competent body for regulating all aspects of atomic energy. The Act also vests a Minister designated by the Government with research and exploitation functions; thus, by Ministerial order, Atomic Energy of Canada Limited was established in 1952 as a State-owned company. The Nuclear Liability Act, 1970, channels all liability for nuclear damage to the operator of a nuclear installation and requires him to obtain insurance in the amount of $75 million, part of which may be re-insured by the Government. The licensing requirements comprise the issuance of a site approval, a construction licence and an operating licence. The AECB is assisted in its licensing functions by its Nuclear Plant Licensing Directorate and by the Reactor Safety Advisory Committee co-operating with each other in making extensive safety assessments of a licence application. A site evaluation report, a preliminary safety report and a final safety report are required in relation to the siting, construction and operation of a nuclear power plant. The Canadian reactor safety philosophy is based on the concept of defence in depth, implemented through a multi-step approach, which includes avoidance of malfunctions, provision of special safety systems, periodic inspection and testing, and avoidance of human errors. Specific criteria and principles have evolved in applying this basic safety philosophy and radiation protection standards are derived from international recommendations. Stringent control is exercised over the management of radioactive waste and management facilities must meet the engineering and procedural requirements of AECB before they can be placed in operation. (author)

  16. Implementing a Public Health Objective for Alcohol Premises Licensing in Scotland: A Qualitative Study of Strategies, Values, and Perceptions of Evidence

    Directory of Open Access Journals (Sweden)

    Niamh Fitzgerald

    2017-02-01

    Full Text Available The public health objective for alcohol premises licensing, established in Scotland in 2005, is unique globally. We explored how public health practitioners engaged with the licensing system following this change, and what helped or hindered their efforts. Semi-structured interviews were conducted with 13 public health actors, audio-recorded, and analysed using an inductive framework approach. Many interviewees viewed the new objective as synonymous with reducing population-level alcohol consumption; however, this view was not always shared by licensing actors, some of whom did not accept public health as a legitimate goal of licensing, or prioritised economic development instead. Some interviewees were surprised that the public health evidence they presented to licensing boards did not result in their hoped-for outcomes; they reported that licensing officials did not always understand or value health data or statistical evidence. While some tried to give “impartial” advice to licensing boards, this was not always easy; others were clear that their role was one of “winning hearts and minds” through relationship-building with licensing actors over time. Notwithstanding the introduction of the public health objective, there remain significant, and political, challenges in orienting local premises licensing boards towards decisions to reduce the availability of alcohol in Scotland.

  17. Incomplete by Design: A Study of a Design-in-Use Approach to Systems Implementation

    DEFF Research Database (Denmark)

    Torkilsheyggi, Arnvør Martinsdóttir á; Hertzum, Morten

    2017-01-01

    In complex work settings the design of a system, including the associated work practices, must be completed in use to derive full benefit from the system. We investigate the introduction of an electronic whiteboard throughout a hospital in which management substituted a local design-in-use process......, driven by super users, for a centrally organized implementation process. The aim of this study is to investigate the design-in-use approach to systems implementation with respect to the tension that ensued between hospital management’s expectations to the process and the goals pursued in the individual...

  18. Design Based Research: The Way of Developing and Implementing

    Science.gov (United States)

    Štemberger, Tina; Cencic, Majda

    2016-01-01

    The appropriate implementation of innovation is a crucial factor in improving educational practice. In the implementation process, there is, however, often a lack of interaction between designers and practitioners that would enable the latter to become competent enough to implement theoretical knowledge into practice and to have an ongoing support…

  19. The licensing process of the design modifications of Cernavoda 2 NPP resulting from the operating experience of CANDU plants

    International Nuclear Information System (INIS)

    Goicea, L.

    2005-01-01

    The CANDU 6 plant now under construction in Cernavoda include over two hundred significant improvements made in order to comply with current codes and standards and licensing requirements relative to the operating CANDU 6 in Romania. These evolutionary improvements are incorporated in CANDU 6 design taking advance of CANDU operating experience, of the designer company research and development and technical advances worldwide in order to further enhance safety, reliability and economics. This paper gives a general idea of the evaluation of the modifications of the Cernavoda 2 nuclear power plant against the design of Cernavoda 1 and states the safety principles and requirements which are the basis for this evaluation. (author)

  20. Technology licensing in China

    DEFF Research Database (Denmark)

    Wang, Yuandi; Li-Ying, Jason; Chen, Jin

    2015-01-01

    We explore the landscape of technology licensing among Chinese entities in the period 2000–12, using a unique database on technological licensing from the State Intellectual Property Office of China. We find that: first, among Chinese licensee organizations, firms have dominated in terms...... of the number of licensed technologies; second, the geographical distribution of licensed technologies among the provinces has gradually reached a new quantitative balance; third, utility models are the most popular technologies to be licensed and the majority of technology licensing in China has been between...... Chinese entities, and most transactions have been local within provinces; and finally, Chinese firms have gradually in-licensed newer and newer technologies, but the technologies in-licensed from foreign sources are by no means state-of-the-art. We make several suggestions for innovation policy...

  1. Implementation of 10 CFR 20.1406 through Life Cycle Planning for Decommissioning

    International Nuclear Information System (INIS)

    O'Donnell, E.; Ott, W.R.

    2009-01-01

    This paper summarizes a newly released regulatory guide (RG 4.21 'Minimization of Contamination and Radioactive Waste Generation - Life Cycle Planning') issued by the U.S. Nuclear Regulatory Commission (NRC) in June 2008. The purpose of RG 4.21 is to support implementation of 10 CFR 20.1406 'Minimization of Contamination'. That regulation is a portion of NRC's License Termination Rule and it is intended to avoid 'legacy sites', that is, those without financial means to satisfactorily terminate a license. As currently written, 10 CFR 20.1406 applies to all NRC license applications and applications for standard design certifications submitted after August 20, 1997. The regulation requires applicants to address in their application how they will (1) minimize contamination of the facility and environment, (2) minimize waste generation, and (3) facilitate decommissioning. The regulation represents a dramatically different approach to licensing because it mandates consideration of decommissioning before submittal of a license application or design for certification. The guidance in RG 4.21 consists of design considerations drawn from nuclear industry experience and lessons learned from decommissioning. These have been combined to support the development of a contaminant management philosophy. The principles embodied in this philosophy are threefold: (1) prevention of unintended releases; (2) early detection, if there is unintended release of radioactive contamination; and (3) prompt assessment to support a timely and appropriate response. Applying these principles requires the use of sound design, proven engineering practices, conservative radiation protection principles, and attention to operational practices. All of this should be considered in the context of the life cycle of the facility from the early planning stages through the final plans for decommissioning and waste disposal. This guide describes some of the mechanisms that can be employed for facility life

  2. The problem of licensing and safety of nuclear power plants

    International Nuclear Information System (INIS)

    Silva, R.A. da.

    1987-01-01

    The historical evolution of licensing process of nuclear power plants is presented. The designs carried out by FURNAS for constructing Angra-1 reactor and its contribution to the Brazilian CNEN in de licensing process, are evaluated. The aims of FURNAS Research Programs are determined and the safety goals are established. (M.C.K.) [pt

  3. License Application Design Selection Feature Report: Waste Package Self Shielding Design Feature 13

    International Nuclear Information System (INIS)

    Tang, J.S.

    2000-01-01

    In the Viability Assessment (VA) reference design, handling of waste packages (WPs) in the emplacement drifts is performed remotely, and human access to the drifts is precluded when WPs are present. This report will investigate the feasibility of using a self-shielded WP design to reduce the radiation levels in the emplacement drifts to a point that, when coupled with ventilation, will create an acceptable environment for human access. This provides the benefit of allowing human entry to emplacement drifts to perform maintenance on ground support and instrumentation, and carry out performance confirmation activities. More direct human control of WP handling and emplacement operations would also be possible. However, these potential benefits must be weighed against the cost of implementation, and potential impacts on pre- and post-closure performance of the repository and WPs. The first section of this report will provide background information on previous investigations of the self-shielded WP design feature, summarize the objective and scope of this document, and provide quality assurance and software information. A shielding performance and cost study that includes several candidate shield materials will then be performed in the subsequent section to allow selection of two self-shielded WP design options for further evaluation. Finally, the remaining sections will evaluate the impacts of the two WP self-shielding options on the repository design, operations, safety, cost, and long-term performance of the WPs with respect to the VA reference design

  4. A licensing discussion: SMRs in Canada

    International Nuclear Information System (INIS)

    De Vos, M.

    2013-01-01

    The CNSC (Canadian AECB) is ready to regulate Small Modular Reactors (SMR) facilities in Canada. The CNSC is well situated to engage with proponents of SMR reactors in design reviews or licensing discussions. A risk-informed (graded) approach is possible in many instances for reactors but it is not a relaxation of requirements. The vendor design review process helps reduce regulatory risks by encouraging early engagement.

  5. Status of safety issues at licensed power plants

    International Nuclear Information System (INIS)

    1991-03-01

    As part of ongoing US Nuclear Regulatory Commission (NRC) efforts to ensure the quality and accountability of safety issue information, a program has been established whereby an annual NUREG series report will be published on the status of licensee implementation and NRC verification of safety issues in major NRC requirement areas. The data contained in this report are a product of the NRC's Safety Issues Management System database, which is maintained by the Project Management Staff in the Office of Nuclear Reactor Regulation and by personnel in the NRC regions. This report has been prepared in order to provide a comprehensive description of the implementation and verification status of all the TMI Action Plan requirements at licensed reactors, and to make this information available to other interested parties, including the public. A corollary purpose of this report is for it to serve as a follow-on to NUREG-0933, ''A Prioritization of Safety Issues,'' which tracks safety issues up until requirements are approved for imposition at licensed facilities

  6. Challenges of implementation and implementation research: Learning from an intervention study designed to improve tumor registry reporting

    Directory of Open Access Journals (Sweden)

    Ann Scheck McAlearney

    2016-08-01

    Full Text Available Objectives: Implementation of interventions designed to improve the quality of medical care often proceeds differently from what is planned. Improving existing conceptual models to better understand the sources of these differences can help future projects avoid these pitfalls and achieve desired effectiveness. To inform an adaptation of an existing theoretical model, we examined unanticipated changes that occurred in an intervention designed to improve reporting of adjuvant therapies for breast cancer patients at a large, urban academic medical center. Methods: Guided by the complex innovation implementation conceptual framework, our study team observed and evaluated the implementation of an intervention designed to improve reporting to a tumor registry. Findings were assessed against the conceptual framework to identify boundary conditions and modifications that could improve implementation effectiveness. Results: The intervention successfully increased identification of the managing medical oncologist and treatment reporting. During implementation, however, unexpected external challenges including hospital acquisitions of community practices and practices’ responses to government incentives to purchase electronic medical record systems led to unanticipated changes and associated threats to implementation. We present a revised conceptual model that incorporates the sources of these unanticipated challenges. Conclusion: This report of our experience highlights the importance of monitoring implementation over time and accounting for changes that affect both implementation and measurement of intervention impact. In this article, we use our study to examine the challenges of implementation research in health care, and our experience can help future implementation efforts.

  7. Computational implementation of a systems prioritization methodology for the Waste Isolation Pilot Plant: A preliminary example

    Energy Technology Data Exchange (ETDEWEB)

    Helton, J.C. [Arizona State Univ., Tempe, AZ (United States). Dept. of Mathematics; Anderson, D.R. [Sandia National Labs., Albuquerque, NM (United States). WIPP Performance Assessments Departments; Baker, B.L. [Technadyne Engineering Consultants, Albuquerque, NM (United States)] [and others

    1996-04-01

    A systems prioritization methodology (SPM) is under development to provide guidance to the US DOE on experimental programs and design modifications to be supported in the development of a successful licensing application for the Waste Isolation Pilot Plant (WIPP) for the geologic disposal of transuranic (TRU) waste. The purpose of the SPM is to determine the probabilities that the implementation of different combinations of experimental programs and design modifications, referred to as activity sets, will lead to compliance. Appropriate tradeoffs between compliance probability, implementation cost and implementation time can then be made in the selection of the activity set to be supported in the development of a licensing application. Descriptions are given for the conceptual structure of the SPM and the manner in which this structure determines the computational implementation of an example SPM application. Due to the sophisticated structure of the SPM and the computational demands of many of its components, the overall computational structure must be organized carefully to provide the compliance probabilities for the large number of activity sets under consideration at an acceptable computational cost. Conceptually, the determination of each compliance probability is equivalent to a large numerical integration problem. 96 refs., 31 figs., 36 tabs.

  8. Computational implementation of a systems prioritization methodology for the Waste Isolation Pilot Plant: A preliminary example

    International Nuclear Information System (INIS)

    Helton, J.C.

    1996-04-01

    A systems prioritization methodology (SPM) is under development to provide guidance to the US DOE on experimental programs and design modifications to be supported in the development of a successful licensing application for the Waste Isolation Pilot Plant (WIPP) for the geologic disposal of transuranic (TRU) waste. The purpose of the SPM is to determine the probabilities that the implementation of different combinations of experimental programs and design modifications, referred to as activity sets, will lead to compliance. Appropriate tradeoffs between compliance probability, implementation cost and implementation time can then be made in the selection of the activity set to be supported in the development of a licensing application. Descriptions are given for the conceptual structure of the SPM and the manner in which this structure determines the computational implementation of an example SPM application. Due to the sophisticated structure of the SPM and the computational demands of many of its components, the overall computational structure must be organized carefully to provide the compliance probabilities for the large number of activity sets under consideration at an acceptable computational cost. Conceptually, the determination of each compliance probability is equivalent to a large numerical integration problem. 96 refs., 31 figs., 36 tabs

  9. FLEX: A Modular Software Architecture for Flight License Exam

    Science.gov (United States)

    Arsan, Taner; Saka, Hamit Emre; Sahin, Ceyhun

    This paper is about the design and implementation of an examination system based on World Wide Web. It is called FLEX-Flight License Exam Software. We designed and implemented flexible and modular software architecture. The implemented system has basic specifications such as appending questions in system, building exams with these appended questions and making students to take these exams. There are three different types of users with different authorizations. These are system administrator, operators and students. System administrator operates and maintains the system, and also audits the system integrity. The system administrator can not be able to change the result of exams and can not take an exam. Operator module includes instructors. Operators have some privileges such as preparing exams, entering questions, changing the existing questions and etc. Students can log on the system and can be accessed to exams by a certain URL. The other characteristic of our system is that operators and system administrator are not able to delete questions due to the security problems. Exam questions can be inserted on their topics and lectures in the database. Thus; operators and system administrator can easily choose questions. When all these are taken into consideration, FLEX software provides opportunities to many students to take exams at the same time in safe, reliable and user friendly conditions. It is also reliable examination system for the authorized aviation administration companies. Web development platform - LAMP; Linux, Apache web server, MySQL, Object-oriented scripting Language - PHP are used for developing the system and page structures are developed by Content Management System - CMS.

  10. Resolution of thermal-hydraulic safety and licensing issues for the system 80+trademark design

    International Nuclear Information System (INIS)

    Carpentino, S.E.; Ritterbusch, S.E.; Schneider, R.E.

    1995-01-01

    The System 80+ trademark Standard Design is an evolutionary Advanced Light Water Reactor (ALWR) with a generating capacity of 3931 MWt (1350 MWe). The Final Design Approval (FDA) for this design was issued by the Nuclear Regulatory Commission (NRC) in July 1994. The design certification by the NRC is anticipated by the end of 1995 or early 1996. NRC review of the System 80+ design has involved several new safety issues never before addressed in a regulatory atmosphere. In addition, conformance with the Electric Power Research Institute (EPRI) ALWR Utility Requirements Document (URD) required that the System 80+ plant address nuclear industry concerns with regard to design, construction, operation and maintenance of nuclear power plants. A large number of these issues/concerns deals with previously unresolved generic thermal-hydraulic safety issues and severe accident prevention and mitigation. This paper discusses the thermal-hydraulic analyses and evaluations performed for the System 80+ design to resolve safety and licensing issues relevant to both the Nuclear Stream Supply System (NSSS) and containment designs. For the NSSS design, the Safety Depressurization System mitigation capability and resolution of the boron dilution concern are described. Examples of containment design issues dealing with containment shell strength, robustness of the reactor cavity walls and hydrogen mixing under severe accident conditions are also provided. Finally, the overall approach used in the application of NRC's new (NUREG-1465) radiological source term for System 80+ evaluation is described. The robustness of the System 80+ containment design to withstand severe accident consequences was demonstrated through detailed thermal-hydraulic analyses and evaluations. This advanced design to shown to meet NRC severe accident policy goals and ALWR URD requirements without any special design features and unnecessary costs

  11. Westinghouse AP1000 licensing maturity

    International Nuclear Information System (INIS)

    Schulz, T.; Vijuk, R.P.

    2005-01-01

    The Westinghouse AP1000 Program is aimed at making available a nuclear power plant that is economical in the U.S deregulated electrical power industry in the near-term. The AP1000 is two-loop 1000 MWe pressurizer water reactor (PWR). It is an up rated version of the AP600. The AP1000 uses passive safety systems to provide significant and measurable improvements in plant simplification, safety, reliability, investment protection and plant costs. The AP1000 uses proven technology, which builds on over 35 years of operating PWR experience. The AP1000 received Final Design Approval by the United States Nuclear Regulatory Commission (U.S. NRC) in September 2004. The AP1000 meets the US utility requirements. The AP1000 and its sister plant the AP600 have gone through a very through and complete licensing review. This paper describes the U.S. NRC review efforts of both the AP600 and the AP1000. The detail of the review and the independent calculations, evaluations and testing is discussed. The AP600 licensing documentation was submitted in 1992. The U.S. NRC granted Final Design Approval in 1999. During the intervening 7 years, the U.S. NRC asked thousands of questions, performed independent safety analysis, audited Westinghouse calculations and analysis, and performed independent testing. The more significant areas of discussion will be described. For the AP1000 Westinghouse first engaged the U.S. NRC in pre-certification discussions to define the extent of the review required, since the design is so similar to the AP600. The AP1000 licensing documentation was submitted in March 2002. The U.S. NRC granted Final Design Approval in September 2004. During the intervening 2 1/2 years, the U.S. NRC asked hundreds of questions, performed independent safety analysis, audited Westinghouse calculations and analysis, and performed independent testing. The more significant areas of discussion will be described. The implications of this review and approval on AP1000 applications in

  12. Selecting and Improving Quasi-Experimental Designs in Effectiveness and Implementation Research.

    Science.gov (United States)

    Handley, Margaret A; Lyles, Courtney R; McCulloch, Charles; Cattamanchi, Adithya

    2018-04-01

    Interventional researchers face many design challenges when assessing intervention implementation in real-world settings. Intervention implementation requires holding fast on internal validity needs while incorporating external validity considerations (such as uptake by diverse subpopulations, acceptability, cost, and sustainability). Quasi-experimental designs (QEDs) are increasingly employed to achieve a balance between internal and external validity. Although these designs are often referred to and summarized in terms of logistical benefits, there is still uncertainty about (a) selecting from among various QEDs and (b) developing strategies to strengthen the internal and external validity of QEDs. We focus here on commonly used QEDs (prepost designs with nonequivalent control groups, interrupted time series, and stepped-wedge designs) and discuss several variants that maximize internal and external validity at the design, execution and implementation, and analysis stages.

  13. Implementing risk-informed life-cycle design

    International Nuclear Information System (INIS)

    Hill, Ralph S.

    2009-01-01

    This paper describes a design process based on risk-informed probabilistic design methodologies that cover a facility's life-cycle from start of conceptual design through decontamination and decommissioning. The concept embodies use of probabilistic risk assessments to establish target reliabilities for facility systems and components. The target reliabilities are used for system based code margin exchange and performance simulation analyses to optimize design over all phases (design, construction, operation and decommissioning) of a facility's life-cycle. System based code margin exchange reduces excessive level of construction margins for passive components to appropriate levels resulting in a more flexible structure of codes and standards that improves facility reliability and cost. System and subsystem simulation analyses determine the optimum combination of initial system and component construction reliability, maintenance frequency, and inspection frequency for both active and passive components. The paper includes a description of these risk-informed life-cycle design processes, a summary of work being done, and a discussion of additional work needed to implement the process.

  14. Role of cognitive models of operators in the design, operation and licensing of nuclear power plants

    International Nuclear Information System (INIS)

    Rasmussen, J.

    1982-01-01

    Cognitive models of the behavior of nuclear power plant operators - that is, models developed in terms of human properties rather than external task characteristics - are assuming increasingly important roles in plant design, operation and licensing. This is partly due to an increased concern for human decision making during unfamiliar plant conditions, and partly due to problems that arise when modern information technology is used to support operators in complex situations. Some of the problems identified during work on interface design and risk analysis are described. First, the question of categories of models is raised. Next, the use of cognitive models for system design is discussed. The use of the available cognitive models for more effective operator training is also advocated. The need for using cognitive models in risk analysis is also emphasized. Finally, the sources of human performance data, that is, event reports, incident analysis, experiments, and training simulators are mentioned, and the need for a consistent framework for data analysis based on cognitive models is discussed

  15. Mindfully implementing simulation tools for supporting pragmatic design inquiries

    NARCIS (Netherlands)

    Hartmann, Timo; olde Scholtenhuis, Léon Luc; Zerjav, Vedran; Champlin, Carissa J

    2015-01-01

    Based upon a conceptualization of the engineering design process as pragmatic inquiry, this paper introduces a framework for supporting designers and design managers with a better understanding of the trade-offs required for a successful implementation of simulation tools. This framework contributes

  16. Nuclear fuel licensing requirements: present status and future trends

    International Nuclear Information System (INIS)

    Gantchev, T.; Vitkova, M.; Gorinov, I.; Datcheva, D.; Rashkova, N.

    2001-01-01

    The nuclear fuel licensing process must be directed to establishing of criteria for licensing (fuel safety criteria) and relationship between safety limits, technical specifications and operational conditions. This paper discusses the fuel safety criteria as used by NRC and Russian vendor. A survey on the available fuel behavior, modeling and related computer codes is given with respect to help the licensing process including new safety features of general changes in fuel design and operational conditions. Several types of computer codes that are used in safety analysis are sensitive to fuel-related parameters. The need for further code development and verification has been stated on many occasions: new design elements, such as different cladding materials, higher burnup, different fuel microstructure and use of MOX fuel can affect the performance of these codes. Regulatory inspection practices during operation and refueling in different countries are also shown. Future trends are discussed in particular with regard to the coming high burnup and to new core management schemes

  17. Consensus standards utilized and implemented for nuclear criticality safety in Japan

    International Nuclear Information System (INIS)

    Nomura, Yasushi; Okuno, Hiroshi; Naito, Yoshitaka

    1996-01-01

    The fundamental framework for the criticality safety of nuclear fuel facilities regulations is, in many advanced countries, generally formulated so that technical standards or handbook data are utilized to support the licensing safety review and to implement its guidelines. In Japan also, adequacy of the safety design of nuclear fuel facilities is checked and reviewed on the basis of licensing safety review guides. These guides are, first, open-quotes The Basic Guides for Licensing Safety Review of Nuclear Fuel Facilities,close quotes and as its subsidiaries, open-quotes The Uranium Fuel Fabrication Facility Licensing Safety Review Guidesclose quotes and open-quotes The Reprocessing Facility Licensing Safety Review Guides.close quotes The open-quotes Nuclear Criticality Safety Handbook close-quote of Japan and the Technical Data Collection are published and utilized to supply related data and information for the licensing safety review, such as for the Rokkasho reprocessing plant. The well-established technical standards and data abroad such as those by the American Nuclear Society and the American National Standards Institute are also utilized to complement the standards in Japan. The basic principles of criticality safety control for nuclear fuel facilities in Japan are duly stipulated in the aforementioned basic guides as follows: 1. Guide 10: Criticality control for a single unit; 2. Guide 11: Criticality control for multiple units; 3. Guide 12: Consideration for a criticality accident

  18. Tast Force report on bonding and perpetual care of nuclear licensed activities

    International Nuclear Information System (INIS)

    Anon.

    1975-01-01

    Potential issues which should be considered prior to the adoption and implementation of a bonding or perpetual care program are examined. The following topics are discussed: problem definition; major processors; factors in setting the amount of a bond; waste handling licensees; ore refineries and mills; former AEC licensed facilities; other specific licenses; authority; states where it is deemed that amendment of existing statutes is necessary to authorize imposition of a bonding requirement for licenses; administration; and recommendations. The following appendices are included: summary of cost estimate to decontaminate the American Nuclear Company; report on 1974 national conference on radiation control workshop no. 3; suggested changes to state regulations; and suggested legislation for licensee bonding and perpetual care trust funds

  19. Licensing of nuclear power plants. The case of Sweden in an international comparison

    International Nuclear Information System (INIS)

    Michanek, Gabriel; Soederholm, Patrik

    2009-01-01

    Efficient power plant licensing procedures are essential for the functioning of deregulated electricity markets. The purpose of this paper is to review and analyse the licensing process for nuclear power plants in Sweden, and in part contrast the Swedish case with the corresponding approaches in a selection of other countries. This approach permits a discussion of how licensing processes can be altered and what the benefits and drawbacks of such changes are. The paper highlights and discusses a number of important legal issues and implications, including, for instance: (a) the role of political versus impartial decision-making bodies; (b) the tension between national policy goals and implementation at the local level; (c) public participation and access to justice; (d) consistency and clarity of the legal system; and (e) the introduction of license time limits. (author)

  20. Containment penetration design criteria and implementation

    International Nuclear Information System (INIS)

    Perry, R.F.; Rigamonti, G.; Dainora, J.

    1975-01-01

    A rational design criteria is presented which serves as a basis for the design and analysis of containment piping penetrations. The criteria includes the effect of temperature as well as mechanical loads for the full range of plant conditions. With this criteria various penetration flued head designs have been compared and optimization achieved. Sleeve wall dimensions and containment loads have been determined without reference to piping configuration. An interaction theory which allows the implementation of the criteria for the determination of design loads and minimum sleeve wall thickness. The interaction theory developed applies to elastic-perfectly plastic cylinders (pipes and sleeves) and accounts for the simultaneous load resultants of transverse shear force, bending moment, torsional moment, and axial force in addition to internal pipe pressure. Application of the theory developed to the determination of sleeve thickness and containment design loads is presented in detail. (Auth.)

  1. Saving Teenage Lives: The Case for Graduated Driver Licensing.

    Science.gov (United States)

    National Highway Traffic Safety Administration (DOT), Washington, DC.

    This manual explains what graduated driver licensing (GDL) is and why the National Highway Traffic Safety Administration believes it is so important for every jurisdiction to take steps towards its implementation. Section I introduces the need by defining the teen driving problem: inexperience, risk-taking behavior and immaturity, and greater risk…

  2. Licensing Process for International Projects

    International Nuclear Information System (INIS)

    Raetzke, Christan

    2014-01-01

    Christan Raetzke, lawyer, then outlined why nuclear constructions were always international projects and in which cases it would make sense to also make the licensing process be international. His law consulting firm CONLAR focuses specifically on design review so he could adequately present why an international process would make a lot of sense without being a loss of sovereignty

  3. Libraries and licensing

    Directory of Open Access Journals (Sweden)

    Maja Žumer

    2001-01-01

    Full Text Available In the mid 90s, the abundance of various electronic publications exposed libraries to the problems of licensing electronic content. Various licensing principles have been prepared recently to help libraries in the process; it can be said that in general, the knowledge of licensing issues has improved in libraries of all types. Libraries form consortia in order to gain stronger negotiating positions and obtain better conditions.In the article, new licensing principles are presented in more detail, as well as some domestic and foreign experiences with consortia forming.

  4. Design and implementation of smart web sensors

    Directory of Open Access Journals (Sweden)

    Jevtić Nenad J.

    2015-01-01

    Full Text Available This paper presents the design and implementation of the smart web sensors. The paper briefly describes the concept of automatic configuration based on electronic specifications in industrial measurement and control systems as well as in distributed systems based on the OGC SWE family of standards. The model for the implementation of Plug and Play sensor in accordance with the IEEE 1451 family of standards is analyzed in detail. Special attention is paid to the network connectivity of analog sensors in accordance with IEEE 1451.4. The practical implementation of the 1451.4 compatible network processor for RTD temperature sensors and adequate software support for 1451.4 TEDS generation, are included in the paper.

  5. 10 CFR 50.55 - Conditions of construction permits, early site permits, combined licenses, and manufacturing...

    Science.gov (United States)

    2010-01-01

    ... construction or manufacture, or any defect found in the final design of a facility as approved and released for..., combined licenses, and manufacturing licenses. 50.55 Section 50.55 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Issuance, Limitations, and Conditions of...

  6. Design and implementation of SFQ programmable clock generators

    International Nuclear Information System (INIS)

    Ito, M.; Nakajima, N.; Fujiwara, K.; Yoshikawa, N.; Fujimaki, A.; Terai, H.; Yorozu, S.

    2004-01-01

    We have designed and implemented an SFQ programmable clock generator (PCG), which can generate the variable number of SFQ pulses according to its internal state. The PCG is composed of an SFQ ring oscillator, a control circuit which counts up the number of SFQ pulses and stops the operation of the ring oscillator, and a decoder which defines the initial state of the control circuit. The PCG can generate the variable number of SFQ pulses ranging from 2 to 2 N , where N is the number of T flip-flops in the control circuit. The oscillation frequency of the PCG is designed to be ranging from 6.2 to 18.8 GHz. In this study, we have implemented a PCG generating SFQ pulses ranging from 2 to 2 4 using a cell-based design methodology and confirmed its correct functionality

  7. Improvement suggestions on license extension management for civil nuclear safety equipment activities

    International Nuclear Information System (INIS)

    Sun Xingjian; Liu Hongji; Han Guoli; Jia Fengcai

    2013-01-01

    Based on the concepts of Clear Requirements, Comprehensive Review, Objective Assessment, Dynamic Management, this paper gives improvement suggestions on license extension management for civil nuclear safety equipment design, manufacture, installation and non-destructive examination activities, which include establishing a relatively unified license extension review standard, combining multi-views and close linking license review and supervision, full utilizing the daily supervision and inspection results, as well as further improving motivation and elimination mechanism. (authors)

  8. PWR reactor pressure vessel internals license renewal industry report; revision 1. Final report

    International Nuclear Information System (INIS)

    Schwirian, R.; Robison, G.

    1994-07-01

    The U.S. nuclear power industry, through coordination by the Nuclear Management and Resources Council (NUMARC), and sponsorship by the U.S. Department of Energy (DOE) and the Electric Power Research Institute (EPRI), has evaluated age-related degradation effects for a number of major plant systems, structures and components, in the license renewal technical Industry Reports (IRs). License renewal applicants may choose to reference these IRs in support of their plant-specific license renewal applications, as an equivalent to the integrated plant assessment provisions of the license renewal rule (10 CFR Part 54). Pressurized water reactor (PWR) reactor pressure vessel (RPV) internals designed by all three U.S. PWR nuclear steam supply system vendors have been evaluated relative to the effects of age-related degradation mechanisms; the capability of current design limits; inservice examination, testing, repair, refurbishment, and other programs to manage these effects; and the assurance that these internals can continue to perform their intended safety functions in the license renewal term. This industry report (IR), one of a series of ten, provides a generic technical basis for evaluation of PWR reactor pressure vessel internals for license renewal

  9. Critical Race Design: An Emerging Methodological Approach to Anti-Racist Design and Implementation Research

    Science.gov (United States)

    Khalil, Deena; Kier, Meredith

    2017-01-01

    This article is about introducing Critical Race Design (CRD), a research methodology that centers race and equity at the nucleus of educational opportunities by design. First, the authors define design-based implementation research (DBIR; Penuel, Fishman, Cheng, & Sabelli, 2011) as an equity-oriented education research methodology where…

  10. Session II-H. Regulatory implementation

    International Nuclear Information System (INIS)

    Farzin, M.H.

    1981-01-01

    During FY 1981, the program concepts for implementing the NRC and EPA regulations were formed. These concepts consist of: review and critique of proposed rules; interpretation of rules into practical performance objectives; and planning to achieve compliance of total system performance with the rules. Although still flexible because of the lack of final rules, notable advances in implementation of these concepts were achieved in FY 1981. Technically, proposed and draft rules were evaluated and resulting radionuclide release limits were compared for consistency. For issue identification and resolution activity, six LTR's were initiated, and other topics were identified. In activities leading to total system compliance with regulations, planning and implementation efforts were more clearly defined and integrated. Papers reported in this session are: (1) regulatory implementation concepts and program overview; (2) licensing issue resolution; (3) status of NEPA activities in the NNWSI Program; (4) status of NEPA activities in the ONWI Program; (5) NWTS approach to site characterization reporting; and (6) quality assurance perspectives relative to licensing needs

  11. Assertive community treatment: facilitators and barriers to implementation in routine mental health settings.

    Science.gov (United States)

    Mancini, Anthony D; Moser, Lorna L; Whitley, Rob; McHugo, Gregory J; Bond, Gary R; Finnerty, Molly T; Burns, Barbara J

    2009-02-01

    This study identified barriers and facilitators to the high-fidelity implementation of assertive community treatment. As part of a multistate implementation project for evidence-based practices, training and consultation were provided to 13 newly implemented assertive community treatment teams in two states. Model fidelity was assessed at baseline and at six, 12, 18, and 24 months. Key informant interviews, surveys, and monthly on-site visits were used to monitor implementation processes related to barriers and facilitators. Licensing processes of the state mental health authority provided critical structural supports for implementation. These supports included a dedicated Medicaid billing structure, start-up funds, ongoing fidelity monitoring, training in the model, and technical assistance. Higher-fidelity sites had effective administrative and program leadership, low staff turnover, sound personnel practices, and skilled staff, and they allocated sufficient resources in terms of staffing, office space, and cars. Lower-fidelity sites were associated with insufficient resources, prioritization of fiscal concerns in implementation, lack of change culture, poor morale, conflict among staff, and high staff turnover. In cross-state comparisons, the specific nature of fiscal policies, licensing processes, and technical assistance appeared to influence implementation. State mental health authorities can play a critical role in assertive community treatment implementation but should carefully design billing mechanisms, promote technical assistance centers, link program requirements to fidelity models, and limit bureaucratic requirements. Successful implementation at the organizational level requires committed leadership, allocation of sufficient resources, and careful hiring procedures.

  12. License renewal of the HFR research reactor - A regulatory view

    International Nuclear Information System (INIS)

    Van der Plas, Y.

    2006-01-01

    Full text: Regulatory policy in The Netherlands is having safety evaluations of a nuclear installation each ten year. Recently a periodic safety evaluation has been finished on the 45 MW High Flux Reactor (HFR) in Petten divided over the following main topics: Risk Scoping Study; HEU-LEU fuel conversion; Evaluation against a pre-defined Reference Licensing Basis; Ageing study. The Risk Scoping Study is a limited probabilistic safety assessment showing scenarios towards serious core degradation and their probabilities. Individual risks for members of the public induced by the incidents analyzed in the first phase are compared with the mortality limits and probabilistic doses limits of the national BKSE decree. For non- proliferation reasons the fuel is converted from high to low enriched uranium. Before starting the project a reference licensing basis (RLB) was defined. A list of postulated initiating events (PIEs), re-establishing a design basis has been approved. An ageing management system shall provide information on the actual status and the residual life time of the plant. The evaluation results into a list of deficiencies, recommendations and suggestions from which modifications are to be proposed. Examples are: more redundancy and separation within the reactor protection system; renewal of the emergency and decay heat cooling; addition of a secundary reactor shut down system; more redundancy in the electric power supply; addition of injection valves introducing efficient use of passive cooling inventor) under LOCA conditions; damping of the impact from loads accidentally falling into the pool. A new nuclear license was issued begin 2004, covering all modifications which are to be implemented ultimate end 2007

  13. Licensing of the proposed PBMR-SA

    International Nuclear Information System (INIS)

    Clapisson, G.A.; Henderson, N.R.; Hill, T.F.; Keenan, N.H.; Metcalf, P.E.; Mysenkov, A.

    1997-01-01

    This paper describes the preliminary criteria, which are intended to be used by the South African regulatory authority (CNS), for licensing of the ESKOM proposed - South African high temperature gas-cooled Pebble Bed Modular Reactor (PBMR-SA). The CNS intends to apply the existing CNS licensing approach together with some international design criteria used for advanced reactors as well as international experience gained from the safety evaluation of the MHTGR, THTR, etc. A major requirement to this type of reactor is that it should comply with the current CNS risk criteria and provide, as a minimum, the same degree of protection to the operator, public and environment that is required for the current generation of nuclear reactors. (author)

  14. Implementing Firm Dynamic Capabilities Through the Concept Design Process

    DEFF Research Database (Denmark)

    Nedergaard, Nicky; Jones, Richard

    2011-01-01

    It is well understood that firms operating in highly dynamic and fluid markets need to possess strong dynamic capabilities of sensing (market trajectories), seizing (to capitalise on these trajectories), and transformation (in order to implement sustainable strategies). Less understood is how firms...... actually implement these capabilities. A conceptual model showing how managing concept design processes can help firms systematically develop dynamic capabilities and help bridge the gap between the market-oriented and resource-focused strategic perspectives is presented. By placing this model in a design......-driven innovation perspective three theoretical propositions is derived explicating both the paper’s implementation approach to dynamic capabilities as well as new ways of understanding these capabilities. Concluding remarks are made discussing both the paper’s contribution to the strategic marketing literature...

  15. Conceptual Design of On-line Based Licensing Review and Assesment System of Nuclear Installations and Nuclear Materials ('PRIBEN')

    International Nuclear Information System (INIS)

    Melani, Ai; Chang, Soon Heung

    2008-01-01

    At the present Indonesia has no nuclear power plant in operation yet, although it is expected that the first nuclear power plant will be operated and commercially available in around the year of 2016 to 2017 in Muria Peninsula. There are only three research reactors, one nuclear fuel fabrication plant for research reactors, and one experimental fuel fabrication plant for nuclear power, one isotope production facility and some other research facilities. All the facility is under Nuclear Energy Regulatory Agency (BAPETEN) controlling through regulation, licensing and inspection. The organizations operation submits licensing application to BAPETEN before utilizing the facility. According to the regulation before BAPETEN give license they perform review and assessment for the utility application. Based on the review and assessment result, BAPETEN may stipulate, reject, delay or terminate the license. In anticipation of expansion of the nuclear program in Indonesia, BAPETEN should have an integrated and updated system for review and asses the licensing application. For this reason, an expert system for the review and asses the licensing application, so-called PRIBEN (Perizinan Reaktor, Instalasi dan Bahan Nuklir/Licensing of Reactor, Nuclear Installations and Nuclear Materials), is developed which runs on the online-based reality environment

  16. Licensing of MAPLE reactors in Canada

    International Nuclear Information System (INIS)

    Lee, A.G.; Labrie, J.P.; Langman, V.J.

    1999-01-01

    Full text: The Operating Licence for a MAPLE reactor (i.e., a 10 MW(th), pool-type reactor), has been approved by the Atomic Energy Control Board (AECB) on August 16th, 1999. This Operating Licence has been obtained within three years of the initiation of the MDS Nordion Medical Isotopes Reactor (MMIR) project, which entails the design, construction and commissioning of two 10 MW MAPLE reactors at AECL's Chalk River Laboratories. The scope and nature of the information required by the AECB, the licensing process and highlights of the events which led to successfully obtaining the Operating Licence for the MAPLE reactor are discussed. These discussions address all phases of the licensing process (i.e., the environmental assessment in support of siting, the Preliminary Safety Analysis Report, PSAR, in support of design, procurement and construction, the Final Safety Analysis Report, FSAR, in support of commissioning and operations, and the development of suitable quality assurance subprograms for each phase). An overview of some of the unique technical aspects associated with the MAPLE reactors, and how they have been addressed during the licensing process are also provided (e.g., applying CSA N285.0, General Requirements for Pressure-Retaining Systems and Components in CANDU Nuclear Power Plants, to a small, low pressure, low temperature research reactor, confirmation of the performance of the driver fuel via laboratory and/or in-reactor testing, validation of the computer codes used to perform the safety analyses, critical parameter uncertainty assessment, full scale hydraulic testing of the performance of the design, fuel handling, human factors validation, operator training and certification). (author)

  17. Image simulation for automatic license plate recognition

    Science.gov (United States)

    Bala, Raja; Zhao, Yonghui; Burry, Aaron; Kozitsky, Vladimir; Fillion, Claude; Saunders, Craig; Rodríguez-Serrano, José

    2012-01-01

    Automatic license plate recognition (ALPR) is an important capability for traffic surveillance applications, including toll monitoring and detection of different types of traffic violations. ALPR is a multi-stage process comprising plate localization, character segmentation, optical character recognition (OCR), and identification of originating jurisdiction (i.e. state or province). Training of an ALPR system for a new jurisdiction typically involves gathering vast amounts of license plate images and associated ground truth data, followed by iterative tuning and optimization of the ALPR algorithms. The substantial time and effort required to train and optimize the ALPR system can result in excessive operational cost and overhead. In this paper we propose a framework to create an artificial set of license plate images for accelerated training and optimization of ALPR algorithms. The framework comprises two steps: the synthesis of license plate images according to the design and layout for a jurisdiction of interest; and the modeling of imaging transformations and distortions typically encountered in the image capture process. Distortion parameters are estimated by measurements of real plate images. The simulation methodology is successfully demonstrated for training of OCR.

  18. New Jersey's license plate decal requirement for graduated driver licenses: attitudes of parents and teenagers, observed decal use, and citations for teenage driving violations.

    Science.gov (United States)

    McCartt, Anne T; Oesch, Nathan J; Williams, Allan F; Powell, Tara Casanova

    2013-01-01

    On May 1, 2010, New Jersey implemented a law requiring teenagers with learner's permits or probationary licenses to display reflective decals on the front and rear license plates when they drive. The current study examined attitudes of parents and teenagers toward this requirement, use of decals, and reported violations and police enforcement of the graduated driver license law. Statewide telephone surveys of representative samples of parents and teenagers were conducted in February to April 2010 and March to June 2011. Use of decals among probationary license holders was observed at 4 high schools in fall 2010 and in spring 2011 and hand-out surveys were distributed. Data on citations issued for violations of the graduated driver license law were obtained. When interviewed in spring 2011, a large majority of parents of probationary license holders, parents of learner's permit holders, and teenagers with probationary licenses disapproved of decals for probationary licenses. About two thirds of both sets of parents and about half of teenagers disapproved of decals for learner's permits. Support for decals for both license types declined significantly from 2010 to 2011. For parents and teenagers alike, opposition was mainly attributed to concern about identifying and/or targeting teenage drivers by other drivers, predators, or police. In 2011, 77 percent of parents of probationary license holders said that their teenagers had decals for the vehicles driven most often; 46 percent said their teenagers always used decals. Fifty-six percent of parents of learner's permit holders said that their teenagers had decals for the vehicles driven most often; 37 percent said that their teenagers always used decals. Teenagers' reported violations of license restrictions either increased or were similar in 2011 compared to 2010. Observed rates of decal use by probationary license holders at high schools in spring 2011 ranged from 24 to 64 percent. The number of statewide citations

  19. NRC licensing of uranium enrichment plants

    International Nuclear Information System (INIS)

    Moran, B.W.

    1991-01-01

    The US Nuclear Regulatory Commission (NRC) is preparing a rule making that establishes the licensing requirements for low-enriched uranium enrichment plants. Although implementation of this rule making is timed to correspond with receipt of a license application for the Louisiana Energy Services centrifuge enrichment plant, the rule making is applicable to all uranium enrichment technologies. If ownership of the US gaseous diffusion plants and/or atomic vapor laser isotope separation is transferred to a private or government corporation, these plants also would be licensable under the new rule making. The Safeguards Studies Department was tasked by the NRC to provide technical assistance in support of the rule making and guidance preparation process. The initial and primary effort of this task involved the characterization of the potential safeguards concerns associated with a commercial enrichment plant, and the licensing issues associated with these concerns. The primary safeguards considerations were identified as detection of the loss of special nuclear material, detection of unauthorized production of material of low strategic significance, and detection of production of uranium enriched to >10% 235 U. The primary safeguards concerns identified were (1) large absolute limit of error associated with the material balance closing, (2) the inability to shutdown some technologies to perform a cleanout inventory of the process system, and (3) the flexibility of some technologies to produce higher enrichments. Unauthorized production scenarios were identified for some technologies that could prevent conventional material control and accounting programs from detecting the production and removal of 5 kg 235 U as highly enriched uranium. Safeguards techniques were identified to mitigate these concerns

  20. Licensing of the OPAL reactor during construction and commissioning

    International Nuclear Information System (INIS)

    Summerfield, M.

    2007-01-01

    This paper presents a description of the licensing activities associated with the construction and commissioning of the Australian Nuclear Science and Technology Organisation's (ANSTO) OPAL reactor. It addresses the Construction Licence, the interface between ANSTO, INVAP (the contractor with responsibility for design and construction of the facility) and the Australian Radiation Protection and Nuclear Safety Agency (ARPANSA, the Australian nuclear regulator) during the construction of OPAL, specific licensing issues that have arisen during the construction and commissioning process, and the Operating Licence Application. Particular emphasis will be given to the way in which the licensing process is integrated into the overall project program and the lessons learnt that may be of benefit to other licensees and regulators

  1. Reactor licensing

    International Nuclear Information System (INIS)

    Harvie, J.D.

    2002-01-01

    This presentation discusses reactor licensing and includes the legislative basis for licensing, other relevant legislation , the purpose of the Nuclear Safety and Control Act, important regulations, regulatory document, policies, and standards. It also discusses the role of the CNSC, its mandate and safety philosophy

  2. Specificity in the licensing process of reduced enrichment in the Bulgarian research reactor

    International Nuclear Information System (INIS)

    Vitkova, Marietta; Gorinov, Ivan

    2005-01-01

    The presented paper considers some specific questions of the licensing process regarding the reconstruction of the Bulgarian IRT-2000 research reactor, which includes conversion to the low enriched fuel. This specificity has risen as a result of two facts. The design of the reactor reconstruction was made on the basis of the existing fresh 36% highly enriched fuel. But after finishing of the design process, this fresh highly enriched fuel was shipped back to Russia in the framework of the RERTR program. These facts have involved some changes in both - in the licensing and the design processes. Re-analysis of the neutronic and thermal-hydraulic calculations is required to be made on the base of the technical specifications of the new LEU fuel. To facilitate the licensing process the NRA has adopted regulatory acceptance criteria for approval of the reactor core design with LEU fuel. (author)

  3. Design, implementation, and extension of thermal invisibility cloaks

    Science.gov (United States)

    Zhang, Youming; Xu, Hongyi; Zhang, Baile

    2015-05-01

    A thermal invisibility cloak, as inspired by optical invisibility cloaks, is a device which can steer the conductive heat flux around an isolated object without changing the ambient temperature distribution so that the object can be "invisible" to external thermal environment. While designs of thermal invisibility cloaks inherit previous theories from optical cloaks, the uniqueness of heat diffusion leads to more achievable implementations. Thermal invisibility cloaks, as well as the variations including thermal concentrator, rotator, and illusion devices, have potentials to be applied in thermal management, sensing and imaging applications. Here, we review the current knowledge of thermal invisibility cloaks in terms of their design and implementation in cloaking studies, and their extension as other functional devices.

  4. Status of 10 CFR part 61 implementation

    International Nuclear Information System (INIS)

    Jackson, K.C.

    1984-01-01

    NRC's waste management efforts in support of Part 61, ''Licensing Requirements for Land Disposal of Radioactive Wastes,'' are focused in four principal technical areas: policy and regulation development; policy and regulation implementation; licensing casework; and technical programs to support ongoing regulatory development and implementation. Part 61 implementation has proceeded well. NRC will continue to review topical reports for solidification media and containers on an as-requested basis. The major efforts needed to complete implementation are underway. These include the study engineered alternatives to shallow land burial, update of the Part 61 analysis methodology to allow improved consideration of waste exceeding Class C concentrations, and determination of any changes needed in Part 61 to resolve Resource Recovery and Conservation Act concerns. The curent schedule calls for completion of these activities during FY 1985

  5. Implementation of the electronic DDA workflow for NSSS system design

    International Nuclear Information System (INIS)

    Eom, Young Sam; Kim, Yeon Sung; Lee, Suk Hee; Kim, Mi Kyung

    1996-06-01

    For improving NSSS design quality, and productivity several cases of the nuclear developed nation's integrated management system, such as Mitsubishi's NUWINGS (Japan), AECL's CANDID (Canada) and Duke Powes's (USA) were investigated, and it was studied in this report that the system implementation of NSSS design document computerization and the major workflow process of the DDA (Document Distribution for Agreement). On the basis of the requirements of design document computerization which covered preparation, review, approval and distribution of the engineering documents, KAERI Engineering Information Management System (KEIMS) was implemented. Major effects of this report are to implement GUI panel for input and retrieval of the document index information, to setup electronic document workflow, and to provide quality assurance verification by tracing the workflow history. Major effects of NSSS design document computerization are the improvement of efficiency and reliability and the engineering cost reduction by means of the fast documents verification capability and electronic document transferring system. 2 tabs., 16 figs., 9 refs. (Author)

  6. PSA in licensing, safety reviews and design as applied in Germany

    International Nuclear Information System (INIS)

    Berg, H.P.; Goertz, R.; Schott, H.; Wendling, R.D.

    1994-01-01

    In this paper, two topics - the application of PSA in the regulatory process and the effort to improve PSA methods and models - are addressed. From the regulators' point of view, the most important application of PSA in Germany is presently within the safety reviews of nuclear power plants in operation. The current status of regulatory guidance which shall be provided to establish a uniform procedure for a periodic safety review is described with special emphasis on the role of PSA. An important goal is to have all plant-specific PSAs comparable as far as possible. Guidance for PSA review is under development likewise. Furthermore, the application of PSA in licensing of nuclear power plants is addressed as well as its use in the design process of future pressurized water reactors. The development of models and methods to be applied in PSA has been and will be supported by a number of studies and investigations. An overview of the main issues of these investigations is provided. A specific task was the elaboration of a proposal for incorporating fire events into the PSA. The status of these efforts is outlined. (author). 7 refs, 3 figs, 2 tabs

  7. Safety requirements in the design of research reactors: A Canadian perspective

    International Nuclear Information System (INIS)

    Lee, A.G.; Langman, V.J.

    2000-01-01

    In Canada, the formal development of safety requirements for the design of research reactors in general began under an inter-organizational Small Reactor Criteria Committee. This committee developed safety and licensing criteria for use by several small reactor projects in their licensing discussions with the Atomic Energy Control Board. The small reactor projects or facilities represented included the MAPLE-X10 reactor, the proposed SES-10 heating reactor and its prototype, the SDR reactor at the Whiteshell Laboratories, the Korea Multipurpose Research Reactor (a.k.a., HANARO) in Korea, the SCORE project, and the McMaster University Nuclear Reactor. The top level set of criteria which form a safety philosophy and serve as a framework for more detailed developments was presented at an IAEA Conference in 1989. AECL continued this work to develop safety principles and design criteria for new small reactors. The first major application of this work has been to the design, safety analysis and licensing of the MAPLE 1 and 2 reactors for the MDS Nordion Medical Isotope Reactor Project. This paper provides an overview of the safety principles and design criteria. Examples of an implementation of these safety principles and design criteria are drawn from the work to design the MAPLE 1 and 2 reactors. (author)

  8. Implementing an online pharmaceutical service using design science research.

    Science.gov (United States)

    Lapão, Luís Velez; da Silva, Miguel Mira; Gregório, João

    2017-03-27

    The rising prevalence of chronic diseases is pressing health systems to introduce reforms. Primary healthcare and multidisciplinary models have been suggested as approaches to deal with this challenge, with new roles for nurses and pharmacists being advocated. More recently, implementing healthcare based on information systems and technologies (e.g. eHealth) has been proposed as a way to improve health services. However, implementing online pharmaceutical services, including their adoption by pharmacists and patients, is still an open research question. In this paper we present ePharmacare, a new online pharmaceutical service implemented using Design Science Research. The Design Science Research Methodology (DSRM) was chosen to implement this online service for chronic diseases management. In the paper, DSRM's different activities are explained, from the definition of the problem to the evaluation of the artifact. During the design and development activities, surveys, observations, focus groups, and eye-tracking glasses were used to validate pharmacists' and patients' requirements. During the demonstration and evaluation activities the new service was used with real-world pharmacists and patients. The results show the contribution of DSRM in the implementation of online services for pharmacies. We found that pharmacists spend only 50% of their time interacting with patients, uncovering a clear opportunity to implement online pharmaceutical care services. On the other hand, patients that regularly visit the same pharmacy recognize the value in patient follow-up demanding to use channels such as the Internet for their pharmacy interactions. Limitations were identified regarding the high workload of pharmacists, but particularly their lack of know-how and experience in dealing with information systems (IST) for the provision of pharmaceutical services. This paper summarizes a research project in which an online pharmaceutical service was proposed, designed, developed

  9. Implementation Support of Security Design Patterns Using Test Templates

    Directory of Open Access Journals (Sweden)

    Masatoshi Yoshizawa

    2016-06-01

    Full Text Available Security patterns are intended to support software developers as the patterns encapsulate security expert knowledge. However, these patterns may be inappropriately applied because most developers are not security experts, leading to threats and vulnerabilities. Here we propose a support method for security design patterns in the implementation phase of software development. Our method creates a test template from a security design pattern, consisting of an “aspect test template” to observe the internal processing and a “test case template”. Providing design information creates a test from the test template with a tool. Because our test template is reusable, it can easily perform a test to validate a security design pattern. In an experiment involving four students majoring in information sciences, we confirm that our method can realize an effective test, verify pattern applications, and support pattern implementation.

  10. Nuclear reactor operator licensing

    International Nuclear Information System (INIS)

    Bursey, R.J.

    1978-01-01

    The Atomic Energy Act of 1954, which was amended in 1974 by the Energy Reorganization Act, established the requirement that individuals who had the responsibility of operating the reactors in nuclear power plants must be licensed. Section 107 of the act states ''the Commission shall (1) prescribe uniform conditions for licensing individuals; (2) determine the qualifications of such individuals; and (3) issue licenses to such individuals in such form as the Commission may prescribe.'' The article discusses the types of licenses, the selection and training of individuals, and the administration of the Nuclear Regulatory Commission licensing examinations

  11. Operator licensing examiner standards

    International Nuclear Information System (INIS)

    1987-05-01

    The Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining and licensing of applicants for NRC operator licenses pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). They are intended to assist NRC examiners and facility licensees to understand the examination process better and to provide for equitable and consistent administration of examinations to all applicants by NRC examiners. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator examination licensing policy changes

  12. Licensing in an international triopoly

    Science.gov (United States)

    Ferreira, Fernanda A.; Ferreira, Flávio

    2011-12-01

    We study the effects of entry of two foreign firms on domestic welfare in the presence of licensing, when the incumbent is technologically superior to the entrants. We consider two different situations: (i) the cost-reducing innovation is licensed to both entrants; (ii) the cost-reducing innovation is licensed to just one of the entrants. We analyse three kind of license: (lump-sum) fixed-fee; (per-unit) royalty; and two-part tariff, that is a combination of a fixed-fee and a royalty. We prove that a two part tariff is never an optimal licensing scheme for the incumbent. Moreover, (i) when the technology is licensed to the two entrants, the optimal contract consists of a licensing with only output royalty; and (ii) when the technology is licensed to just one of the entrants, the optimal contract consists of a licensing with only a fixed-fee.

  13. Design, Implementation, and Verification of the Reliable Multicast Protocol. Thesis

    Science.gov (United States)

    Montgomery, Todd L.

    1995-01-01

    This document describes the Reliable Multicast Protocol (RMP) design, first implementation, and formal verification. RMP provides a totally ordered, reliable, atomic multicast service on top of an unreliable multicast datagram service. RMP is fully and symmetrically distributed so that no site bears an undue portion of the communications load. RMP provides a wide range of guarantees, from unreliable delivery to totally ordered delivery, to K-resilient, majority resilient, and totally resilient atomic delivery. These guarantees are selectable on a per message basis. RMP provides many communication options, including virtual synchrony, a publisher/subscriber model of message delivery, a client/server model of delivery, mutually exclusive handlers for messages, and mutually exclusive locks. It has been commonly believed that total ordering of messages can only be achieved at great performance expense. RMP discounts this. The first implementation of RMP has been shown to provide high throughput performance on Local Area Networks (LAN). For two or more destinations a single LAN, RMP provides higher throughput than any other protocol that does not use multicast or broadcast technology. The design, implementation, and verification activities of RMP have occurred concurrently. This has allowed the verification to maintain a high fidelity between design model, implementation model, and the verification model. The restrictions of implementation have influenced the design earlier than in normal sequential approaches. The protocol as a whole has matured smoother by the inclusion of several different perspectives into the product development.

  14. 14 CFR 431.73 - Continuing accuracy of license application; application for modification of license.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Continuing accuracy of license application; application for modification of license. 431.73 Section 431.73 Aeronautics and Space COMMERCIAL SPACE... Conditions § 431.73 Continuing accuracy of license application; application for modification of license. (a...

  15. Design and Implementation of an Innovative Residential PV System

    Science.gov (United States)

    Najm, Elie Michel

    This work focuses on the design and implementation of an innovative residential PV system. In chapter one, after an introduction related to the rapid growth of solar systems' installations, the most commonly used state of the art solar power electronics' configurations are discussed, which leads to introducing the proposed DC/DC parallel configuration. The advantages and disadvantages of each of the power electronics' configurations are deliberated. The scope of work in the power electronics is defined in this chapter to be related to the panel side DC/DC converter. System integration and mechanical proposals are also within the scope of work and are discussed in later chapters. Operation principle of a novel low cost PV converter is proposed in chapter 2. The proposal is based on an innovative, simplified analog implementation of a master/slave methodology resulting in an efficient, soft-switched interleaved variable frequency flybacks, operating in the boundary conduction mode (BCM). The scheme concept and circuit configuration, operation principle and theoretical waveforms, design equations, and design considerations are presented. Furthermore, design examples are also given, illustrating the significance of the newly derived frequency equation for flybacks operating in BCM. In chapters 3, 4, and 5, the design implementation and optimization of the novel DC/DC converter illustrated in chapter 2 are discussed. In chapter 3, a detailed variable frequency BCM flyback design model leading to optimizing the component selections and transformer design, detailed in chapter 4, is presented. Furthermore, in chapter 4, the method enabling the use of lower voltage rating switching devices is also discussed. In chapter 5, circuitry related to Start-UP, drive for the main switching devices, zero-voltage-switching (ZVS) as well as turn OFF soft switching and interleaving control are fully detailed. The experimental results of the proposed DC/DC converter are presented in

  16. Why operators fail licensing examinations

    International Nuclear Information System (INIS)

    Roth, D.R.; Zerbo, J.N.

    1975-01-01

    A survey was conducted among nuclear utility operators who have taken NRC licensing examinations to determine which factors they considered important in their success or failure. The operators also compared the actual NRC examination with their expectations prior to taking the examination. The results of the survey supplement NRC statistics with regard to failure rates. Over 350 operators and 20 utilities participated in the survey and a good cross section of the nuclear community is represented. Reactor theory and emergency procedures are important areas in which operators found NRC emphasis to be different than expected. Observation Training and Design Lecture Series are two training segments which appear to require improvement. Recommendations are made for the use of data collected through this survey and for continuation of the effort to give operators a mechanism of supplying feedback to the training and licensing process

  17. Department of Energy interest and involvement in nuclear plant license renewal activities

    International Nuclear Information System (INIS)

    Bustard, Larry D.; Harrison, Dennis L.

    1991-01-01

    Recognizing the importance of nuclear license renewal to the nation's energy strategy, the Department of Energy (DOE) initiated a plant lifetime improvement program during 1985 to determine the feasibility of the license renewal option for US nuclear plants. Initial activities of the DOE program focused on determining whether there were technical and economic obstacles that might preclude or limit the successful implementation of the license renewal option. To make this determination, DOE co-sponsored with the Electric Power Research Institute (EPRI) 'pilot-plant' efforts by Virginia Electric Power and Northern States Power. Both pilot-plant efforts concluded that life extension is technically and economically feasible. In parallel with the pilot plant activities, DOE performed national economic studies that demonstrated the economic desirability of life extension. Having demonstrated the feasibility of life extension, DOE, in conjunction with EPRI, selected two lead plants to demonstrate the license renewal process. These lead plants are Yankees Atomic's Yankee Rowe facility and Northern States Power's Monticello facility. DOE also initiated activities to develop the technical and regulatory bases to support the license renewal process in the United States. These include (1) development of a methodology for identifying systems, structures, and components important to license renewal, (2) development of industry reports that describe industry-accepted approaches for license renewal of ten important classes of equipment, (3) development of technical basis to support license renewal, and (4) interaction/negotiation with the NRC through the Nuclear Management Resources Council (NUMARC) regarding appropriate regulatory requirements for license renewal. DOE has recently identified nuclear plant license renewal to be an important element of its National Energy Strategy. This paper summarizes the significant results, conclusions and ongoing activities of the DOE effort

  18. Resolution of thermal-hydraulic safety and licensing issues for the system 80+{sup {trademark}} design

    Energy Technology Data Exchange (ETDEWEB)

    Carpentino, S.E.; Ritterbusch, S.E.; Schneider, R.E. [ABB-Combustion Engineering, Windsor, CT (United States)] [and others

    1995-09-01

    The System 80+{sup {trademark}} Standard Design is an evolutionary Advanced Light Water Reactor (ALWR) with a generating capacity of 3931 MWt (1350 MWe). The Final Design Approval (FDA) for this design was issued by the Nuclear Regulatory Commission (NRC) in July 1994. The design certification by the NRC is anticipated by the end of 1995 or early 1996. NRC review of the System 80+ design has involved several new safety issues never before addressed in a regulatory atmosphere. In addition, conformance with the Electric Power Research Institute (EPRI) ALWR Utility Requirements Document (URD) required that the System 80+ plant address nuclear industry concerns with regard to design, construction, operation and maintenance of nuclear power plants. A large number of these issues/concerns deals with previously unresolved generic thermal-hydraulic safety issues and severe accident prevention and mitigation. This paper discusses the thermal-hydraulic analyses and evaluations performed for the System 80+ design to resolve safety and licensing issues relevant to both the Nuclear Stream Supply System (NSSS) and containment designs. For the NSSS design, the Safety Depressurization System mitigation capability and resolution of the boron dilution concern are described. Examples of containment design issues dealing with containment shell strength, robustness of the reactor cavity walls and hydrogen mixing under severe accident conditions are also provided. Finally, the overall approach used in the application of NRC`s new (NUREG-1465) radiological source term for System 80+ evaluation is described. The robustness of the System 80+ containment design to withstand severe accident consequences was demonstrated through detailed thermal-hydraulic analyses and evaluations. This advanced design to shown to meet NRC severe accident policy goals and ALWR URD requirements without any special design features and unnecessary costs.

  19. School Counselor Lead Initial Individual Career and Academic Plan Implementation Design

    Science.gov (United States)

    Moeder-Chandler, Markus

    2017-01-01

    In Fall of 2014 for Fountain-Fort Carson School District #8 undertook a revamping of graduation and state-mandated ICAP requirements for implementation for the graduating class of 2021. This design and implementation process included numerous stakeholders and several years of planning from Fall of 2014 to Spring of 2017. The design and…

  20. A BWR licensing experience in the USA

    International Nuclear Information System (INIS)

    Powers, J.; Ogura, C.; Arai, K.; Thomas, S.; Mookhoek, B.

    2015-09-01

    The US-Advanced Boiling Water Reactor (A BWR), certified by the United States Nuclear Regulatory Commission (US NRC), is a third generation, evolutionary boiling water reactor design which is the reference for the South Texas Project Units 3 and 4 (STP3-4) Combined License Application (Cola). Nuclear Innovation North America (Nina) is the License Applicant for this new build project, and Toshiba is the selected primary technology contractor. The STP3-4 project has finished the US NRC technical review of the Cola through the final meeting of the Advisory Committee on Reactor Safeguards (ACRS), and the Final Safety Evaluation Report (FSER) is scheduled to be issued by the US NRC in the middle of 2015. The next steps are to support the Mandatory Hearing process, and voting by the NRC commissioners on the motion to grant the Combined License, which is scheduled beginning of 2016 according to US NRC schedule as of March 30, 2015. This paper summarizes the history and progress of the US-A BWR licensing, including the experiences of the Licensee, Nina, and Toshiba as the Epc team worked through the Code of Federal Regulations Title 10 (10-Cfr) Part 52 process, and provides some perspectives on how the related licensing material would also be of value within a 10-Cfr Part 50, two-step process to minimize schedule and financial risks which could arise from ongoing technical developments and regulatory reviews. (Author)

  1. A BWR licensing experience in the USA

    Energy Technology Data Exchange (ETDEWEB)

    Powers, J.; Ogura, C. [Toshiba America Nuclear Energy, Charlotte, North Carolina (United States); Arai, K. [Toshiba Corporation, Yokohama, Kanagawa (Japan); Thomas, S.; Mookhoek, B., E-mail: jim.powers@toshiba.com [Nuclear Innovation North America, Lake Jackson, Texas (United States)

    2015-09-15

    The US-Advanced Boiling Water Reactor (A BWR), certified by the United States Nuclear Regulatory Commission (US NRC), is a third generation, evolutionary boiling water reactor design which is the reference for the South Texas Project Units 3 and 4 (STP3-4) Combined License Application (Cola). Nuclear Innovation North America (Nina) is the License Applicant for this new build project, and Toshiba is the selected primary technology contractor. The STP3-4 project has finished the US NRC technical review of the Cola through the final meeting of the Advisory Committee on Reactor Safeguards (ACRS), and the Final Safety Evaluation Report (FSER) is scheduled to be issued by the US NRC in the middle of 2015. The next steps are to support the Mandatory Hearing process, and voting by the NRC commissioners on the motion to grant the Combined License, which is scheduled beginning of 2016 according to US NRC schedule as of March 30, 2015. This paper summarizes the history and progress of the US-A BWR licensing, including the experiences of the Licensee, Nina, and Toshiba as the Epc team worked through the Code of Federal Regulations Title 10 (10-Cfr) Part 52 process, and provides some perspectives on how the related licensing material would also be of value within a 10-Cfr Part 50, two-step process to minimize schedule and financial risks which could arise from ongoing technical developments and regulatory reviews. (Author)

  2. NRC's license renewal regulations

    International Nuclear Information System (INIS)

    Akstulewicz, Francis

    1991-01-01

    In order to provide for the continuity of the current generation of nuclear power plant operating licenses and at the same time ensure the health and safety of the public, and the quality of the environment, the US Nuclear Regulatory Commission (NRC) established a goal of developing and issuing regulations and regulatory guidance for license renewal in the early 1990s. This paper will discuss some of those activities underway to achieve this goal. More specifically, this paper will discuss the Commission's regulatory philosophy for license renewal and the two major license renewal rule makings currently underway. The first is the development of a new Part 54 to address procedural and technical requirements for license renewal; the second is a revision to existing Part 51 to exclude environmental issues and impacts from consideration during the license renewal process. (author)

  3. Mechatronic Systems Analysis, Design and Implementation

    CERN Document Server

    Boukas, El-Kébir

    2012-01-01

    This book deals with the analysis, the design and the implementation of the mechatronic systems. Classical and modern tools are developed for the analysis and the design for such systems. Robust control, H-Infinity and guaranteed cost control theory are also used for analysis and design of mechatronic systems. Different controller such as state feedback, static output feedback and dynamic output feedback controllers are used to stabilize mechatronic systems. Heuristic algorithms are provided to solve the design of the classical controller such as PID, phase lead, phase lag and phase lead-lag controllers while linear matrix inequalities (LMI) algorithms are provided for finding solutions to the state feedback, static output feedback and dynamic output feedback controllers. The theory presented in the different chapters of the volume is applied to numerical examples to show the usefulness of the theoretical results. Some case studies are also provided to show how the developed concepts apply for real system. Em...

  4. Licensed Healthcare Facilities

    Data.gov (United States)

    California Natural Resource Agency — The Licensed Healthcare Facilities point layer represents the locations of all healthcare facilities licensed by the State of California, Department of Health...

  5. IRIS Licensing Status

    International Nuclear Information System (INIS)

    Kling, Charles L.; Carelli, Mario D.

    2006-01-01

    The International Reactor Innovative and Secure (IRIS) nuclear power plant is well into the pre-application review process with the US NRC and has accomplished its first near term goal of obtaining US NRC feedback on the long term testing program. To date, the IRIS team has submitted to the US NRC a number of documents patterned after the Evaluation Model Development and Assessment Process (EMDAP) outlined in Regulatory Guide 1,203. They have covered a detailed description of IRIS, initial safety analysis results, PIRT development for limiting transients, scaling analysis and a description of the test program. The IRIS Safety-by-Desing TM intrinsically eliminates and/or significantly reduces the consequences of traditional LWR accidents. In addition, the fewer passive safety systems are similar in principle to those of the US NRC approved AP1000 design. For these reasons, the IRIS testing program only needs to include those features unique to the IRIS design. NRC feedback was that the planned test program appeared to be complete and could generate sufficient information to support a Design Certification (DC) submittal. The US NRC has also stated that a DC application must include complete information regarding the test program. On this basis the IRIS team has initiated an aggressive program to conduct IRIS testing to support a DC submittal by the end of 2008. Subsequent US NRC review should be expeditious because of the AP1000 precedent, allowing IRIS to obtain its Final Design Approval (FDA) in 2012; thereby, maintaining its goal of deployment in the 2015-2017 time frame. The next steps in the pre-application review process will be to provide the US NRC with a road map of the anticipated IRIS licensing process, a review of current licensing requirements showing that IRIS meets or exceeds all current criteria and information to support the long term goal of redefining the Emergency Planning Zone (EPZ)

  6. Perspective about the US license Renewal for NNPP's; Perspectiva sobre la renovacion de licencia para centrales nucleares en los Estados Unidos

    Energy Technology Data Exchange (ETDEWEB)

    Lehnert, D. F.

    2004-07-01

    This article provides and overview of the US License Renewal Rule, 10 CFR 54, and its implementation in the US leading to the preparation and review of a license renewal application. The key regulatory documents and the industry's methodology and guidance for successfully implementing the Rule are discussed. While the process still undergoes change and optimization, it has become predictable and reliable, such that utilities can establish realistic schedules and budgets to complete the license renewal process. Nearly 60% of the US operating units have either received and extended operating license, have submitted their application for review, or have committed to submit an application in the next few years. The article concludes with a discussion of lessons learned from this wealth of experience and some emerging issues that may affect license renewal process. (Author)

  7. Risk, innovation and change : design propositions for implementing risk management in organizations

    NARCIS (Netherlands)

    van Staveren, Martinus Theodorus

    2009-01-01

    This Ph.D. research generated unique design propositions for implementing existing risk management methodologies in organizations. The resulting design propositions incorporate a synthesis of risk management, innovation management and change management. True implementation of risk management is

  8. Safety philosophy and licensing practice in different member states of IAEA: Germany, F.R

    International Nuclear Information System (INIS)

    Lahner, K.

    1981-01-01

    The safety philosophy, as the basis of the design of a NPP, will be shown under the aspects of general design rules, requirements by law, reactor safety commission and nuclear or conventional technical standards. Then a discussion of the licensing practise in the Federal Republic of Germany and in the USA will follow for the different stages of conceptual design, construction and operation with special consideration of the example of the NPP Muelheim-Kaerlich. The interrelation between designer and licensing authority, reactor safety commission and technical consultants will be taken into account. (orig./RW)

  9. 2015 Business Licenses

    Data.gov (United States)

    City of Jackson, Mississippi — This data displays all business license information for the year of 2015. This information details license classifications and status. This information will updated...

  10. Teenagers' licensing decisions and their views of licensing policies: a national survey.

    Science.gov (United States)

    Williams, Allan F

    2011-08-01

    One objective was to determine teenage licensing rates on a national basis, interest in early licensure, and reasons for delay. A second objective was to learn teenagers' opinions about licensing policies, important in states considering ways to upgrade their current licensing systems. One thousand three hundred eighty-three 15- to 18-year-olds completed an online survey in November 2010. They were drawn from a nationally representative panel of US households recruited using probability-based sampling. The panel included cell phone-only households, and Internet access was provided to those without it. Weighting procedures were applied so that the study population represented the national US population of 15- to 18-year-olds. Most teens said that they were interested in getting a license as soon as legally possible, but many had not started the process. At 16, teens were about equally divided among those who had not started, those in the learner stage, and those with a restricted or full license. At 18, 62 percent had full licenses; 22 percent had not started. For those old enough to start, lack of a car, costs, parent availability, ability to get around without a car, and being busy with other activities were leading reasons for delay. The majority of teens were not in favor of higher licensing ages. Forty-six percent thought the minimum learner age should be 16; 30 percent thought the full license age should be 18 or older. The majority approved of night (78%) and passenger (57%) restrictions, and 85 and 93 percent endorsed cell phone and texting bans, respectively. When these policies were packaged together in a single law that included an age 16 start, night, passenger, cell phone and texting bans, and a full license at age 18, 74 percent of teens were in favor. Teenagers are not as supportive of strong licensing policies as parents of teens, but there is evidence that they will support comprehensive policies likely to lead to further reductions in teen crash

  11. Improving the effectiveness of impact assessment pertaining to Indigenous peoples in the Brazilian environmental licensing procedure

    International Nuclear Information System (INIS)

    Hanna, Philippe; Vanclay, Frank; Langdon, Esther Jean; Arts, Jos

    2014-01-01

    The number of environmental licence applications for projects affecting Indigenous peoples in Brazil has increased since the implementation of a major infrastructure program (Programa de Aceleração do Crescimento) in 2007. This increase has caused problems for Brazilian agencies involved in environmental licensing procedures (IBAMA, FUNAI and others). We analyze the Brazilian environmental licensing procedure for situations involving Indigenous peoples, Maroons (Quilombolas) or other traditional communities in order to identify potential improvements for Brazil and potentially other countries. Although Brazilian procedures are consistent with international best practice in environmental licensing, in practice social impacts are inadequately addressed, mitigation measures are poorly implemented, and there is a lack of enforcement and compliance. The paper is based on document analysis and interviews with key actors in governmental and non-governmental organizations and Indigenous leaders. We suggest that Free, Prior and Informed Consent (FPIC) processes need to be conducted at the earliest stages of project planning, and that Indigenous peoples should actively participate in impact assessment, monitoring and evaluation processes. In order to achieve a social licence to operate, there needs to be full recognition of traditional knowledge and acceptance of Indigenous values and concepts. We also recommend increased involvement of social experts and mediators as well as improved accountability, enforcement and grievance mechanisms in the licensing process. - Highlights: • The Brazilian environmental licensing system needs to address social impacts better. • Communities need to be consulted at the earliest stage possible. • Indigenous peoples need to be invited to participate in impact assessment teams. • Independent Indigenous committees to monitor implementation of mitigation measures. • Accountability, enforcement and grievance mechanisms need to be

  12. Improving the effectiveness of impact assessment pertaining to Indigenous peoples in the Brazilian environmental licensing procedure

    Energy Technology Data Exchange (ETDEWEB)

    Hanna, Philippe [Department of Cultural Geography, Faculty of Spatial Sciences, University of Groningen, PO Box 800, 9700 AV Groningen (Netherlands); Vanclay, Frank, E-mail: frank.vanclay@rug.nl [Department of Cultural Geography, Faculty of Spatial Sciences, University of Groningen, PO Box 800, 9700 AV Groningen (Netherlands); Langdon, Esther Jean [Department of Anthropology, Center for Philosophy and Human Sciences, Federal University of Santa Catarina PO Box 5104, 88040-970, Florianópolis, SC (Brazil); Arts, Jos [Department of Planning, Faculty of Spatial Sciences, University of Groningen, PO Box 800, 9700 AV Groningen (Netherlands)

    2014-04-01

    The number of environmental licence applications for projects affecting Indigenous peoples in Brazil has increased since the implementation of a major infrastructure program (Programa de Aceleração do Crescimento) in 2007. This increase has caused problems for Brazilian agencies involved in environmental licensing procedures (IBAMA, FUNAI and others). We analyze the Brazilian environmental licensing procedure for situations involving Indigenous peoples, Maroons (Quilombolas) or other traditional communities in order to identify potential improvements for Brazil and potentially other countries. Although Brazilian procedures are consistent with international best practice in environmental licensing, in practice social impacts are inadequately addressed, mitigation measures are poorly implemented, and there is a lack of enforcement and compliance. The paper is based on document analysis and interviews with key actors in governmental and non-governmental organizations and Indigenous leaders. We suggest that Free, Prior and Informed Consent (FPIC) processes need to be conducted at the earliest stages of project planning, and that Indigenous peoples should actively participate in impact assessment, monitoring and evaluation processes. In order to achieve a social licence to operate, there needs to be full recognition of traditional knowledge and acceptance of Indigenous values and concepts. We also recommend increased involvement of social experts and mediators as well as improved accountability, enforcement and grievance mechanisms in the licensing process. - Highlights: • The Brazilian environmental licensing system needs to address social impacts better. • Communities need to be consulted at the earliest stage possible. • Indigenous peoples need to be invited to participate in impact assessment teams. • Independent Indigenous committees to monitor implementation of mitigation measures. • Accountability, enforcement and grievance mechanisms need to be

  13. Beyond usability: designing effective technology implementation systems to promote patient safety.

    Science.gov (United States)

    Karsh, B-T

    2004-10-01

    Evidence is emerging that certain technologies such as computerized provider order entry may reduce the likelihood of patient harm. However, many technologies that should reduce medical errors have been abandoned because of problems with their design, their impact on workflow, and general dissatisfaction with them by end users. Patient safety researchers have therefore looked to human factors engineering for guidance on how to design technologies to be usable (easy to use) and useful (improving job performance, efficiency, and/or quality). While this is a necessary step towards improving the likelihood of end user satisfaction, it is still not sufficient. Human factors engineering research has shown that the manner in which technologies are implemented also needs to be designed carefully if benefits are to be realized. This paper reviews the theoretical knowledge on what leads to successful technology implementation and how this can be translated into specifically designed processes for successful technology change. The literature on diffusion of innovations, technology acceptance, organisational justice, participative decision making, and organisational change is reviewed and strategies for promoting successful implementation are provided. Given the rapid and ever increasing pace of technology implementation in health care, it is critical for the science of technology implementation to be understood and incorporated into efforts to improve patient safety.

  14. Radiopharmaceutical licensing

    International Nuclear Information System (INIS)

    Mather, S.J.

    1992-01-01

    Recent health service legislation, and especially the loss of crown immunity has once again focussed attention on the arrangements for licensing of radiopharmaceuticals. The aim of the article is to describe in general terms the UK licensing system and in particular to provide guidance to those responsible for the supply of radiopharmaceuticals in hospitals. (author)

  15. Implementing risk-informed life-cycle design

    International Nuclear Information System (INIS)

    Hill, Ralph S. III

    2007-01-01

    This paper describes a design process based on risk-informed probabilistic methodologies that cover a facility's life-cycle from start of conceptual design through decontamination and decommissioning. The concept uses probabilistic risk assessments to identify target reliabilities for facility systems and components. Target reliabilities are used in system and subsystem simulation analyses to determine the optimum combination of initial system and component construction reliability, maintenance frequency, and inspection frequency for both active and passive components. The target reliabilities are also used for system based code margin exchange to reduce excessive level of margins to appropriate levels resulting in a more flexible structure of codes and standards that improves facility reliability and cost. The paper includes a description of a risk informed life-cycle design process, a summary of work being done, and a discussion of work needed to implement the process. (author)

  16. Licensing system for primary category radioactive installations

    International Nuclear Information System (INIS)

    Ramirez Riquelme, Angelica Beatriz

    1997-01-01

    The development of a licensing system for primary category radioactive installations is described, which aims to satisfy the needs of the Chilean Nuclear Energy Commission's Department of Nuclear and Radiological Safety, particularly the sections for Licensing Outside Radioactive Installations and Safety Control. This system involves the identification, control and inspection of the installations, their personnel and connected activities, for the purpose of protecting the population's health and the environment. Following the basic cycle methodology, a systems analysis and engineering stage was prepared, establishing the functions of the system's elements and defining the requirements, based on interviews with the users. This stage was followed by the design stage, focusing on the data structure, the software architecture and the procedural detail. The codification stage followed, which translated the design into legible machine-readable format. In the testing stage, the entries that were defined were proven to produce the expected data. Finally and operational and maintenance stage was developed, when the system was installed and put to use. All the above generated a useful system for the Licensing section of the Department of Nuclear and Radiological Safety, since it provides faster and easier access to information. A project is described that introduces new development tools in the Computer department following standards established by the C.CH.E.N. (author)

  17. State Licenses & Permits

    Data.gov (United States)

    Small Business Administration — Starting a business? Confused about whether you need a business license or permit? Virtually every business needs some form of license or permit to operate legally....

  18. Operator licensing examiner standards

    International Nuclear Information System (INIS)

    1983-10-01

    The Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining and licensing of applicants for NRC operator licenses pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). They are intended to assist NRC examiners and facility licensees to understand the examination process better and to provide for equitable and consistent administration of examinations to all applicants by NRC examiners. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator examination licensing policy changes. As appropriate, these standards will be revised periodically to accommodate comments and reflect new information or experience

  19. The SLOWPOKE licensing model

    Energy Technology Data Exchange (ETDEWEB)

    Snell, V. G.; Takats, F.; Szivos, K.

    1989-08-15

    The SLOWPOKE Energy System (SES-10) is a 10 MW heating reactor that has been developed in Canada. It will be capable of running without a licensed operator in continuous attendance, and will be sited in urban areas. It has forgiving safety characteristics, including transient time-scales of the order of hours. A process called `up-front` licensing has been evolved in Canada to identify, and resolve, regulatory concerns early in the process. Because of the potential market in Hungary for nuclear district heating, a licensing plan has been developed that incorporates Canadian licensing experience, identifies specific Hungarian requirements, and reduces the risk of licensing delays by seeking agreement of all parties at an early stage in the program.

  20. Survey of the authorities competent for licensing and supervision in the field of radiation protection under the terms of the Atomic Energy Act (As of January 1980)

    International Nuclear Information System (INIS)

    1980-01-01

    Contents: 1. Portfolio of the Federal Minister of Defence. 2. Handling of other radioactive substances, equipment for the generation of ionizing radiation and activities in installations owned by third parties: 2.1 Licensing authorities; 2.2 competent authorities for the acception and documentation of notifications required under sections 4, sub-section 1, 17 sub-section 1, of the Radiation Protection Ordinance; 2.3 authorities competent for the registration of radiation records; 2.4 supervisory authorities. 3. Carriage of radioactive substances: 3.1 Federal authorities responsible for licensing and supervisions; 3.2 Land authorities responsible for licensing; 3.3 Land authorities responsible for supervision. 4. Permits concerning the design of equipment. 5. Import and export of radioactive substances: 5.1 Licensing authorities; 5.2 supervisory authorities. 6. Competent authorities in accordance with section 63 sub-section 3 paragraph 1 of the Radiation Protection Ordinance (monitoring stations) and according to the provisions of Land legislation. 7. Licensing and supervisory authorities for the treatment, processing or any other use of nuclear fuels under section 9 of the Atomic Energy Act. 8. Competences of the Laender in the implementation of the Atomic Energy Act and the Radiation Protection Ordinance. (orig.) [de

  1. License to build

    International Nuclear Information System (INIS)

    Huntelaar, Mark; Vos, Renate de; Roobol, Lars

    2007-01-01

    Full text: A new license under the nuclear power act is applied for at the Dutch Government for the building of a High Active Repackaging Unit (HAVA-VU in Dutch) at NRG in Petten, The Netherlands. This new building is necessary to comply with our nuclear license to dispose of high active nuclear waste at Petten to the intermediate storage facility (COVRA). In the first part of this paper attention is given to the formal procedure followed by the Government, what type of documents are to be submitted, what time frames are followed, how citizen participation is organized, and as final result a new license. In the second part more detailed information is given about the present license renewal needed for the High Active Repackaging Unit

  2. Implementing analytics a blueprint for design, development, and adoption

    CERN Document Server

    Sheikh, Nauman

    2013-01-01

    Implementing Analytics demystifies the concept, technology and application of analytics and breaks its implementation down to repeatable and manageable steps, making it possible for widespread adoption across all functions of an organization. Implementing Analytics simplifies and helps democratize a very specialized discipline to foster business efficiency and innovation without investing in multi-million dollar technology and manpower. A technology agnostic methodology that breaks down complex tasks like model design and tuning and emphasizes business decisions rather than the technology behi

  3. Design and implementation of a terrorist fraud resilient distance bounding system

    NARCIS (Netherlands)

    Ranganathan, A.; Tippenhauer, N.O.; Skoric, B.; Singelée, D.; Capkun, S.; Foresti, S.; Yung, M.; Martinelli, F.

    2012-01-01

    Given the requirements of fast processing and the complexity of RF ranging systems, distance bounding protocols have been challenging to implement so far; only few designs have been proposed and implemented. Currently, the most efficient implementation of distance bounding protocols uses analog

  4. Ignalina plant licensing process, international co-operation and assistance

    International Nuclear Information System (INIS)

    Bystedt, P.

    1999-01-01

    The challenge for Lithuania as a country with regained independence was to perform a licensing review in a way never done before in the country and in a time schedule that was extremely short. The work included establishing of the licensing base, strengthening the regulatory authority and organising the technical support, establish and implement a safety improvement program, production of the safety case and review of the safety case, and to derive a conclusion regarding whether to issue a licence or not. This was to be done together with other tasks, such as implementation of modifications included in the safety improvement programme at Ignalina, implementation of a new storage for spent fuel and, most important of all, to manage the operational safety at the plant. The achievements are impressive seen in view of the point of start and in view of the time and resources that have been available. Lithuania has put forward a unique safety documentation of an RBMK reactor and presented an in-depth safety evaluation in full openness to Western experts, giving the unique possibility to compare the safety of the Ignalina reactors to Western standards. The co-operation that has been established between Lithuania and Western experts through different assistance programmes is of outmost value, for all involved parties. Co-operation should continue as one element of the challenges for the future

  5. Validation, acceptance and licensing

    International Nuclear Information System (INIS)

    Wene, C.O.

    1992-01-01

    The licensing process requires communication of complex scientific and technical information. In this paper transfer of such information is discussed using concepts and ideas from systems analysis, cybernetics and argumentation theory. A simple model for the decision process is developed. The analysis stresses the need for careful design of the communication channels between the three systems involved: the political system, the judicial-regulatory system and the scientific-technical community. The Dialogue - Scenario project initiated by the Swedish nuclear Inspectorate is briefly presented

  6. Development and implementation of setpoint tolerances for special safety systems

    International Nuclear Information System (INIS)

    Oliva, A.F.; Balog, G.; Parkinson, D.G.; Archinoff, G.H.

    1991-01-01

    The establishment of tolerances and impairment limits for special safety system setpoints is part of the process whereby the plant operator demonstrates to the regulatory authority that the plant operates safely and within the defined plant licensing envelope. The licensing envelope represents the set of limits and plant operating state and for which acceptably safe plant operation has been demonstrated by the safety analysis. By definition, operation beyond this envelope contributes to overall safety system unavailability. Definition of the licensing envelope is provided in a wide range of documents including the plant operating licence, the safety report, and the plant operating policies and principles documents. As part of the safety analysis, limits are derived for each special safety system initiating parameter such that the relevant safety design objectives are achieved for all design basis events. If initiation on a given parameter occurs at a level beyond its limit, there is a potential reduction in safety system effectiveness relative to the performance credited in the plant safety analysis. These safety system parameter limits, when corrected for random and systematic instrument errors and other errors inherent in the process of periodic testing or calibration, are then used to derive parameter impairment levels and setpoint tolerances. This paper describes the methodology that has evolved at Ontario Hydro for developing and implementing tolerances for special safety system parameters (i.e., the shutdown systems, emergency coolant injection system and containment system). Tolerances for special safety system initiation setpoints are addressed specifically, although many of the considerations discussed here will apply to performance limits for other safety system components. The first part of the paper deals with the approach that has been adopted for defining and establishing setpoint limits and tolerances. The remainder of the paper addresses operational

  7. Demarcation of the licensing and supervisory procedures for nuclear engineering installations

    International Nuclear Information System (INIS)

    Schattke, H.

    1986-01-01

    The remarks can be summed up under 12 points: 1) The protective purpose outlined in Paragraph 1 No. 2 of the Atomic Energy Law is the top priority for both licensing and regulatory authorities. 2) Both authorities must aim at the best possible prevention of hazards and precautions against risks. 3) The licensing procedures cover applications for licenses, the regulatory procedures check and supervise actual activities. 4) The licensing procedures take precedence in chronology and in substance over the regulatory procedure. 5) The licensing procedure is a preliminary check on the intention to carry out nuclear activities before the event; whereas the regulatory procedure controls the licensee after the event to ensure that the latter's activities really do conform to the framework laid down in the license. 6) The licensing procedure must be verified by state supervision with regard to its prognostic activity. 7) The examination criteria are largely identical for both the authorites. 8) The examination tools for the licensing and regulatory authorities also coincide to a large extent. Legal differences in the possible means of enforcement have no effect in practice. 9) Decisions made by either authority can be either in the licensee's favour or to its disadvantage. Nevertheless, the contents of decisions differ widely between the two authorities. 10) The regulatory authorities execute and prepare the decisions of the licensing authorites. 11) Licensing decisions can be designated static/prognostic, whereas regulatory measures accompany the actual performance of the plant and the operating personnel in a dynamic/controlling manner. 12) Regulatory instructions are usually of a temporary nature, whereas licensing actions are permanent as a rule. (orig.) [de

  8. Evaluation of Terminated Nuclear Material Licenses

    International Nuclear Information System (INIS)

    Spencer, K.M.; Zeighami, E.A.

    1999-01-01

    This report presents the results of a six-year project that reviewed material licenses that had been terminated during the period from inception of licensing until approximately late-1994. The material licenses covered in the review project were Part 30, byproduct material licenses; Part 40, source material licenses; and Part 70, special nuclear material licenses. This report describes the methodology developed for the project, summarizes the findings of the license file inventory process, and describes the findings of the reviews or evaluations of the license files. The evaluation identified nuclear material use sites that need review of the licensing material or more direct follow-up of some type. The review process also identified licenses authorized to possess sealed sources for which there was incomplete or missing documentation of the fate of the sources

  9. Department of Energy interest and involvement in nuclear plant license renewal activities

    International Nuclear Information System (INIS)

    Bustard, L.D.; Harrison, D.L.

    1991-01-01

    Recognizing the importance of nuclear license renewal to the nation's energy strategy, the Department of Energy (DOE) initiated a plant lifetime improvement program during 1985 to determine the feasibility of the license renewal option for US nuclear plants. Initial activities of the DOE program focused on determining whether there were technical and economic obstacles that might preclude or limit the successful implementation of the license renewal option. To make this determination, DOE cosponsored with the Electric Power Research Institute (EPRI) pilot-plant efforts by Virginia Electric Power and Northern States Power. Both pilot-plant efforts concluded that life extension is technically and economically feasible. In parallel with the pilot-plant activities, DOE performed national economic studies that demonstrated the economic desirability of life extension. Having demonstrated the feasibility of life extension, DOE, in conjunction with EPRI, selected two lead plants to demonstrate the license renewal process. These lead plants are Yankee Atomic's Yankee Rowe facility and Northern States Power's Monticello facility. DOE also initiated activities to develop the technical and regulatory bases to support the license renewal process in the United States. DOE has recently identified nuclear plant license renewal to be an important element of its National Energy Strategy. This paper summarizes the significant results, conclusions, and ongoing activities of the DOE effort. 18 refs

  10. Implementing Adaptive Educational Methods with IMS Learning Design

    NARCIS (Netherlands)

    Specht, Marcus; Burgos, Daniel

    2006-01-01

    Please, cite this publication as: Specht, M. & Burgos, D. (2006). Implementing Adaptive Educational Methods with IMS Learning Design. Proceedings of Adaptive Hypermedia. June, Dublin, Ireland. Retrieved June 30th, 2006, from http://dspace.learningnetworks.org

  11. Design and FPGA Implementation of a new hyperchaotic system

    International Nuclear Information System (INIS)

    Wang Guangyi; Bao Xulei; Wang Zhonglin

    2008-01-01

    In this paper, a new four-dimensional autonomous hyperchaotic system is designed for generating complex chaotic signals. In the design, its parameters are selected according to the requirements for chaos and hyperchaos. The hyperchaotic Nature is verified theoretically by using the bifurcation analysis and demonstrated experimentally by the implementation of an analogue electronic circuit. Moreover, the Field Programmable Gate Array (FPGA) technology is applied to implementing a continuous system in a digital form by using a chip of Altera Cyclone II EP2C35F484C8. The digital sequence generated from the FPGA device is observed in our experimental setup. (general)

  12. Application of the NEI 95-10 methodology in the Rcic system of the Unit-1, to implement the criterions of the license renovation rule; (10 Cfr-54)

    International Nuclear Information System (INIS)

    Diaz, A.; Mendoza, G.; Arganis, C.; Viais, J.; Contreras, A.; Fernandez, G.; Medina, G.

    2012-10-01

    In December of 1991, the US National Regulatory Commission (US NRC) published the 10 Cfr-54, to establish the procedures, criterions and necessary requirements for the license renovation of a nuclear power station. In 1994 the US NRC proposed an amendment to these requirements that basically were centered in the effects of the aging in structures and passive components of long life and in the inclusion of Time Limited Aging Analyses (TLAAs). In a general way, is established that the requester should show to the regulator body that the effects of the aging in structures, systems and components are and will be appropriately negotiated or that the TLAAs has been evaluated for the operation extended period. The NEI 95-10 is a guide document developed by the Nuclear Energy Institute (NEI), to provide a focus accepted to cover the requirements of 10 Cfr-54, offering an efficient process that allows to any requester to complete in a practical way the requirements of the License Renovation Rule and to supplement their solicitude. This work presents the application of this guide to the Reactor Core Insulation Cooling (Rcic) of the Unit 1 of the nuclear power plant of Laguna Verde, elect as pilot system to carry out the application of the 10 Cfr-54 following the recommended methodology by the Industrial Guide for the implementation of the License Renovation Rule. (Author)

  13. Contestable Licensing

    OpenAIRE

    Zvika Neeman; Gerhard O. Orosel

    2000-01-01

    We analyze a model of repeated franchise bidding for natural monopoly with contestable licensing - a franchisee halds an (exclusive) license to operate a franchise until another rm offers to pay more for it. In a world where quality is observable but not veri able, the simple regulatory scheme we describe combines market-like incentives with regulatory oversight to generate efficient outcomes.

  14. Design and implementation of an intranet dashboard.

    Science.gov (United States)

    Wolpin, S E

    2005-01-01

    Healthcare organizations are complex systems and well served by efficient feedback mechanisms. Many organizations have invested in data warehouses; however there are few tools for automatically extracting and delivering relevant measures to decision makers. This research study resulted in the design and implementation of an intranet dashboard linked to a data warehouse.

  15. Implementing XML Schema Naming and Design Rules

    Energy Technology Data Exchange (ETDEWEB)

    Lubell, Joshua [National Institute of Standards and Technology (NIST); Kulvatunyou, Boonserm [ORNL; Morris, Katherine [National Institute of Standards and Technology (NIST); Harvey, Betty [Electronic Commerce Connection, Inc.

    2006-08-01

    We are building a methodology and tool kit for encoding XML schema Naming and Design Rules (NDRs) in a computer-interpretable fashion, enabling automated rule enforcement and improving schema quality. Through our experience implementing rules from various NDR specifications, we discuss some issues and offer practical guidance to organizations grappling with NDR development.

  16. Swarming Robot Design, Construction and Software Implementation

    Science.gov (United States)

    Stolleis, Karl A.

    2014-01-01

    In this paper is presented an overview of the hardware design, construction overview, software design and software implementation for a small, low-cost robot to be used for swarming robot development. In addition to the work done on the robot, a full simulation of the robotic system was developed using Robot Operating System (ROS) and its associated simulation. The eventual use of the robots will be exploration of evolving behaviors via genetic algorithms and builds on the work done at the University of New Mexico Biological Computation Lab.

  17. Design reviews from a regulatory perspective

    International Nuclear Information System (INIS)

    Foster, B.D.

    1991-01-01

    This paper presents views on the role of the licensing engineer in the design process with specific emphasis on design reviews and the automated information management tools that support design reviews. The licensing engineer is seen as an important member of a design review team. The initial focus of the licensing engineer during design reviews is shown to be on ensuring that applicable regulatory requirements are addressed by the design. The utility of an automated tool, such as a commitments management system, to support regulatory requirements identification is discussed. The next responsibility of the licensing engineer is seen as verifying that regulatory requirements are transformed into measurable performance requirements. Performance requirements are shown to provide the basis for developing detailed design review criteria. Licensing engineer input during design reviews is discussed. This input is shown to be especially critical in cases where review findings may impact application of regulatory requirements. The use of automated tools in supporting design reviews is discussed. An information structure is proposed to support design reviews in a regulated environment. This information structure is shown to be useful to activities beyond design reviews. Incorporation of the proposed information structure into the Licensing Support System is proposed

  18. Nuclear plant license renewal

    International Nuclear Information System (INIS)

    Gazda, P.A.; Bhatt, P.C.

    1991-01-01

    During the next 10 years, nuclear plant license renewal is expected to become a significant issue. Recent Electric Power Research Institute (EPRI) studies have shown license renewal to be technically and economically feasible. Filing an application for license renewal with the Nuclear Regulatory Commission (NRC) entails verifying that the systems, structures, and components essential for safety will continue to perform their safety functions throughout the license renewal period. This paper discusses the current proposed requirements for this verification and the current industry knowledge regarding age-related degradation of structures. Elements of a license renewal program incorporating NRC requirements and industry knowledge including a schedule are presented. Degradation mechanisms for structural components, their significance to nuclear plant structures, and industry-suggested age-related degradation management options are also reviewed

  19. Reconfigurable Manufacturing System Design and Implementation

    DEFF Research Database (Denmark)

    Hadar, Ronen; Bilberg, Arne

    2013-01-01

    is meant primarily to show the physical feasibility of the system and provide a first-look into a real production application of the RMS ideas. The purpose of this paper is to present the design of the manufacturer’s RMS proof of concept, its implementation, and evaluation results.......Reconfigurable Manufacturing Systems (RMS) have been an increasing area of interest in the research arena. However, it seems that current literature is lacking application and implementation cases where RMS are simulated, tested, and evaluated as a feasible manufacturing concept. A Manufacturer...... of Consumer Goods identified the potential of the RMS concept and decided to investigate the concept in a real production installation. The result of this development is a proof of concept of a changeable and reconfigurable assembly and decoration system based on the principles of RMS. This proof of concept...

  20. Designing and implementing an ICT4RED initiative

    CSIR Research Space (South Africa)

    Herselman, M

    2014-12-01

    Full Text Available The purpose of this book is to provide an overview of the design and implementation of an Information and Communication Technology for rural education development initiative in a resource constrained environment. This intervention is coined...

  1. Implementing Safeguards-by-Design

    International Nuclear Information System (INIS)

    Bjornard, Trond; Bean, Robert; Durst, Phillip Casey; Hockert, John; Morgan, James

    2010-01-01

    Excerpt Safeguards-by-Design (SBD) is an approach to the design and construction of nuclear facilities whereby safeguards are designed-in from the very beginning. It is a systematic and structured approach for fully integrating international and national safeguards (MC and A), physical security, and other proliferation barriers into the design and construction process for nuclear facilities. SBD is primarily a project management or project coordination challenge, and this report focuses on that aspect of SBD. The present report continues the work begun in 2008 and focuses specifically on the design process, or project management and coordination - the planning, definition, organization, coordination, scheduling and interaction of activities of the safeguards experts and stakeholders as they participate in the design and construction of a nuclear facility. It delineates the steps in a nuclear facility design and construction project, in order to provide the project context within which the safeguards design activities take place, describes the involvement of safeguards experts in the design process, the nature of their analyses, interactions and decisions, as well as describing the documents created and how they are used. Designing and constructing a nuclear facility is an extremely complex undertaking. The stakeholders in an actual project are many - owner, operator, State regulators, nuclear facility primary contractor, subcontractors (e.g. instrument suppliers), architect engineers, project management team, safeguards, safety and security experts, in addition to the IAEA and its team. The purpose of the present report is to provide a common basis for discussions amongst stakeholders to collaboratively develop a SBD approach that will be both practically useful and mutually beneficial. The principal conclusions from the present study are: (1) In the short term, the successful implementation of SBD is principally a project management problem. (2) Life-cycle cost

  2. 31 CFR 596.306 - License.

    Science.gov (United States)

    2010-07-01

    ... ASSETS CONTROL, DEPARTMENT OF THE TREASURY TERRORISM LIST GOVERNMENTS SANCTIONS REGULATIONS General Definitions § 596.306 License. Except as otherwise specified, the term license means any license or...

  3. Understanding Licensing Behavior

    DEFF Research Database (Denmark)

    Cabaleiro, Goretti; Moreira, Solon; Reichstein, Toke

    The potential for rent dissipation has been argued to be the main cause of firms? licensing out behavior being stifled.However, this aspect has been scarcely studied empirically. We draw on rent dissipation arguments, and hypothesize that firms suffering from the not-invented-here (NIH) syndrome......, firms in competitive product markets, and firms that have incurred substantial sunk cost are associated with lower rates of technology out-licensing. We also posit that sunk costs negatively moderate the relationship between competition in the licensor?s product market, and licensing rate. We test our...

  4. Nuclear power stations licensing

    International Nuclear Information System (INIS)

    Solito, J.

    1978-04-01

    The judicial aspects of nuclear stations licensing are presented. The licensing systems of the United States, Spain, France and Federal Republic of Germany are focused. The decree n 0 60.824 from July 7 sup(th), 1967 and the following legislation which define the systematic and area of competence in nuclear stations licensing are analysed [pt

  5. Strategic Basis for License Application Planning for a Potential Yucca Mountain Repository

    International Nuclear Information System (INIS)

    Newberry, C. M.; Brocoum, S. J.; Gamble, R. P.; Murray, R. C.; Cline, M.

    2002-01-01

    If Yucca Mountain, Nevada is designated as the site for development of a geologic repository for disposal of spent nuclear fuel and high-level radioactive waste, the Department of Energy (DOE) must obtain Nuclear Regulatory Commission (NRC) approval first for repository construction, then for an operating license, and, eventually, for repository closure and decommissioning. The licensing criteria defined in Code of Federal Regulations, Title 10, Part 63 (10 CFR Part 63) establish the basis for these NRC decisions. Submittal of a license application (LA) to the NRC for authorization to construct a repository at the Yucca Mountain site is, at this point, only a potential future action by the DOE. The policy process defined in the Nuclear Waste Policy Act (NWPA), as amended, for recommendation and designation of Yucca Mountain as a repository site makes it difficult to predict whether or when the site might be designated. The DOE may only submit a LA to the NRC if the site designation takes effect. In spite of this uncertainty, the DOE must take prudent and appropriate action now, and over the next several years, to prepare for development and timely submittal of a LA. This is particularly true given the need for the DOE to develop, load, and certify the operation of its electronic information system to provide access to its relevant records as part of the licensing support network (LSN) in compliance with NRC requirements six months prior to LA submittal. The DOE must also develop a LA, which is a substantially different document from those developed to support a Site Recommendation (SR) decision. The LA must satisfy NRC licensing criteria and content requirements, and address the acceptance criteria defined by the NRC in its forthcoming Yucca Mountain Review Plan (YMRP). The content of the LA must be adequate to facilitate NRC acceptance and docketing for review, and the LA and its supporting documents must provide the documented basis for the NR C findings required

  6. Design, fabrication and installation of irradiation facilities

    International Nuclear Information System (INIS)

    Kim, Yong Sung; Lee, C. Y.; Kim, J. Y.; Chi, D. Y.; Kim, S. H.; Ahn, S. H.; Kim, S. J.; Kim, J. K.; Yang, S. H.; Yang, S. Y.; Kim, H. R.; Kim, H.; Lee, K. H.; Lee, B. C.; Park, C.; Lee, C. T.; Cho, S. W.; Kwak, K. K.; Suk, H. C.

    1997-07-01

    The principle contents of this project are to design, fabricate and install the steady-state fuel test loop and non-instrumented capsule in HANARO for nuclear technology development. This project will be completed in 1999, the basic and detail design, safety analysis, and procurement of main equipment for fuel test loop have been performed and also the piping in gallery and the support for IPS piping in reactor pool have been installed in 1994. In the area of non-instrumented capsule for material irradiation test, the fabrication of capsule has been completed. Procurement, fabrication and installation of the fuel test loop will be implemented continuously till 1999. As besides, as these irradiation facilities will be installed in HANARO, review of safety concern, discussion with KINS for licensing and safety analysis report has been submitted to KINS to get a license and review of HANARO interface have been performed respectively. (author). 39 refs., 28 tabs., 21 figs

  7. Design, fabrication and installation of irradiation facilities

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Yong Sung; Lee, C. Y.; Kim, J. Y.; Chi, D. Y.; Kim, S. H.; Ahn, S. H.; Kim, S. J.; Kim, J. K.; Yang, S. H.; Yang, S. Y.; Kim, H. R.; Kim, H.; Lee, K. H.; Lee, B. C.; Park, C.; Lee, C. T.; Cho, S. W.; Kwak, K. K.; Suk, H. C. [and others

    1997-07-01

    The principle contents of this project are to design, fabricate and install the steady-state fuel test loop and non-instrumented capsule in HANARO for nuclear technology development. This project will be completed in 1999, the basic and detail design, safety analysis, and procurement of main equipment for fuel test loop have been performed and also the piping in gallery and the support for IPS piping in reactor pool have been installed in 1994. In the area of non-instrumented capsule for material irradiation test, the fabrication of capsule has been completed. Procurement, fabrication and installation of the fuel test loop will be implemented continuously till 1999. As besides, as these irradiation facilities will be installed in HANARO, review of safety concern, discussion with KINS for licensing and safety analysis report has been submitted to KINS to get a license and review of HANARO interface have been performed respectively. (author). 39 refs., 28 tabs., 21 figs.

  8. Design and Implementation of Collaborative Research Approaches

    Science.gov (United States)

    Venti, Mike W.; Berger, David E.

    2009-01-01

    This poster reviews the collarborative research approaches that NASA has been designing and implementing for the Integrated Vehicle Health Management (IVHM) Project. The inputs for the technical plan are reviewed, the Research Test and Integration Plan (RTIP) WIKI, is used to create and propose a multi-themed and multi-partner research testing opportunities. The outputs are testing opportunities.

  9. Design and Implementation of a Cyber-Defense Exercise

    OpenAIRE

    Adrian Furtuna

    2010-01-01

    Learning by practice is a very effective way of education in some activity domains, including information security. The article explores this idea by showing how a cyber-defense exercise can be designed and implemented in order to reach its educational goals.

  10. Design and implementation of FPGA-based phase modulation ...

    Indian Academy of Sciences (India)

    Section 3 deals with the implementation process of the digital con- .... To aid the analysis of the SRC, a simulation model based on the state-space technique is ... compensator designed using 'SISO' tool in Matlab, is a PI compensator which ...

  11. FOSS License Selection and Code Management

    OpenAIRE

    Vescuso, Peter

    2011-01-01

    With nearly 2,000 free and open source software (FLOSS) licenses, software license proliferation¿ can be a major headache for software development organizations trying to speed development through software component reuse, as well as companies redistributing software packages as components of their products. Scope is one problem: from the Free Beer license to the GPL family of licenses to platform-specific licenses such as Apache and Eclipse, the number and variety of licenses make it difficu...

  12. Licensing new nuclear energy plants in the 90s

    International Nuclear Information System (INIS)

    Miller, J.H. III; Bishop, R.W.

    1992-01-01

    This paper reports that the framework for nuclear regulation in the United States was established by Congress in the Atomic Energy Act of 1954 (AEA). Under the AEA, the nuclear power program in the United States was launched with a technology just being developed and a nuclear power industry in its infancy. The regulations fashioned by the Atomic Energy Commission under the AEA took into account the evolving state of the technology and the emerging industry in those formative years. The process required a utility desiring to build and operate a nuclear power plant to obtain two separate licenses: one authorizing construction and one authorizing operation. At the construction permit stage, generally only preliminary design information was available and a construction permit could be issued with as little as ten to fifteen percent of the facility design completed. Thereafter, design completion, along with research and development required to address open technical issues, progressed in tandem with construction in what is fairly characterized as a design-as-you-go process. Only as plant construction approached completion was the adequacy of the final design evaluated in connection with the operating license review process

  13. Documentation control process of Brazilian multipurpose reactor: conceptual design and basic design

    International Nuclear Information System (INIS)

    Kibrit, Eduardo; Prates, Jose Eduardo; Longo, Guilherme Carneiro; Salvetti, Tereza Cristina

    2015-01-01

    Established in the scope of Plan of Action of the Ministry of Science, Technology and Innovation (PACTI/MCTI) in 2007, the construction of the Brazilian Multipurpose Reactor (RMB) is on the way. This type of reactor has a broad spectrum of applications in the nuclear field and related technologies such as the radioisotopes used as supplies in the production of radiopharmaceuticals, with very much benefit to the Brazilian society being, therefore, the main goal of the Project. RMB Project consists of the following stages: site selection and site evaluation; design (conceptual design, basic design, detailed design and experimental design); construction (procurement, manufacturing; civil construction; electromechanical construction and assembling); commissioning; operation and decommissioning. Each stage requires adaptation of human resources for the stage schedule execution. The implementation of a project of this magnitude requires a complex project management, which covers not only technical, but also administrative areas. Licensing, financial resources, quality and document control systems, engineering are some of the areas involved in project success. The development of the conceptual and basic designs involved the participation of three main engineering companies. INTERTECHNE Consultores S.A. was in charge of conceptual and basic designs for conventional systems of buildings and infrastructure. INVAP S.E. was responsible for preparing the basic design of the reactor core and annexes. MRS Estudos Ambientais Ltda. has prepared documents for environmental licensing. This paper describes the procedures used during conceptual and basic design stages to control design documentation and flow of this documentation, involving the analysis and incorporation of comments from experts, control and storage of a volume of approximately 15,000 documents. (author)

  14. Documentation control process of Brazilian multipurpose reactor: conceptual design and basic design

    Energy Technology Data Exchange (ETDEWEB)

    Kibrit, Eduardo; Prates, Jose Eduardo; Longo, Guilherme Carneiro; Salvetti, Tereza Cristina, E-mail: ekibrit@ipen.br, E-mail: jeprates@ipen.br, E-mail: glongo@ipen.br, E-mail: salvetti@ipen.br [Instituto de Pesquisas Energeticas e Nucleares (IPEN/CNEN-SP), Sao Paulo, SP (Brazil)

    2015-07-01

    Established in the scope of Plan of Action of the Ministry of Science, Technology and Innovation (PACTI/MCTI) in 2007, the construction of the Brazilian Multipurpose Reactor (RMB) is on the way. This type of reactor has a broad spectrum of applications in the nuclear field and related technologies such as the radioisotopes used as supplies in the production of radiopharmaceuticals, with very much benefit to the Brazilian society being, therefore, the main goal of the Project. RMB Project consists of the following stages: site selection and site evaluation; design (conceptual design, basic design, detailed design and experimental design); construction (procurement, manufacturing; civil construction; electromechanical construction and assembling); commissioning; operation and decommissioning. Each stage requires adaptation of human resources for the stage schedule execution. The implementation of a project of this magnitude requires a complex project management, which covers not only technical, but also administrative areas. Licensing, financial resources, quality and document control systems, engineering are some of the areas involved in project success. The development of the conceptual and basic designs involved the participation of three main engineering companies. INTERTECHNE Consultores S.A. was in charge of conceptual and basic designs for conventional systems of buildings and infrastructure. INVAP S.E. was responsible for preparing the basic design of the reactor core and annexes. MRS Estudos Ambientais Ltda. has prepared documents for environmental licensing. This paper describes the procedures used during conceptual and basic design stages to control design documentation and flow of this documentation, involving the analysis and incorporation of comments from experts, control and storage of a volume of approximately 15,000 documents. (author)

  15. A top-down design methodology and its implementation for VCSEL-based optical links design

    Science.gov (United States)

    Li, Jiguang; Cao, Mingcui; Cai, Zilong

    2005-01-01

    In order to find the optimal design for a given specification of an optical communication link, an integrated simulation of electronic, optoelectronic, and optical components of a complete system is required. It is very important to be able to simulate at both system level and detailed model level. This kind of model is feasible due to the high potential of Verilog-AMS language. In this paper, we propose an effective top-down design methodology and employ it in the development of a complete VCSEL-based optical links simulation. The principle of top-down methodology is that the development would proceed from the system to device level. To design a hierarchical model for VCSEL based optical links, the design framework is organized in three levels of hierarchy. The models are developed, and implemented in Verilog-AMS. Therefore, the model parameters are fitted to measured data. A sample transient simulation demonstrates the functioning of our implementation. Suggestions for future directions in top-down methodology used for optoelectronic systems technology are also presented.

  16. International standardization of nuclear reactor designs - the way forward

    International Nuclear Information System (INIS)

    Raetzke, Christian

    2010-01-01

    The concept of 'International Standardization of Nuclear Reactor Designs' means that vendors could build their designs in every country without having to adapt it specifically to national safety requirements. Such standardization would have two main effects. It would greatly facilitate nuclear new build worldwide by giving greater efficiency and certainty to the national licensing procedures; by taking into account the fact that vendors, and nowadays also utilities, are active across borders; by helping developing countries to establish their nuclear new build programmes; and by reducing the strain on human resources on both the regulators' and the industry's side. The second valuable effect of standardization would be to further enhance safety by improving the exchange of construction and operating experience among a number of reactors belonging to fleets of the same design. The World Nuclear Association's CORDEL (Cooperation in Reactor Design Evaluation and Licensing) Group has developed a concept for implementation of international standardization of reactor designs. It has defined a number of steps to be taken by industry. At the same time, possibilities offered by national and international regulatory mechanisms would have to be fully made use of, and some changes in regulatory frameworks might be necessary. Some steps especially towards greater cooperation of regulators have already been taken; however, much still remains to be done. The concept of deploying standardized reactor designs across a number of countries supposes an alignment and, if possible, harmonization of national safety standards; a streamlining of national licensing procedures, making them more efficient and predictable; and the willingness of national regulators to take into account licensing done in other countries. In the end, this should lead to a mutual acceptance of design approvals or, in a more distant future, even to a multinational design approval process. All in all, the concept

  17. Learning-by-Licensing: How Chinese Firms Benefit From Licensing-In Technologies

    DEFF Research Database (Denmark)

    Wang, Yuandi; Roijakkers, N.; Vanhaverbeke, W.

    2012-01-01

    This paper explores how interfirm variations in their in-licensed technology portfolios influence subsequent innovation performance. Existing studies mainly assume licensed technologies are homogeneously accessible to firms, and a prevailing explanation as to why firms vary in their innovation pe...

  18. Use of limited information in a license application to construct a repository

    International Nuclear Information System (INIS)

    McGarry, J.M. III; Echols, F.S.

    1996-01-01

    The purpose of this paper is to provide a rationale for the proposition that the Department of Energy's (DOE's) submittal of a license application (LA) for the construction of a geologic repository to the Nuclear Regulatory Commission (NRC) may be, and arguably must be, based on statutorily-limited site characterization data and design information. The Nuclear Waste Policy Act of 1982 (NWPA), as amended, is the controlling statute for the disposal of spent nuclear fuel in a licensed geologic repository. Applicable NRC regulations for the licensing of such a repository are found for the most part in 10 C.F.R. Part 60

  19. An algorithm, implementation and execution ontology design pattern

    NARCIS (Netherlands)

    Lawrynowicz, A.; Esteves, D.; Panov, P.; Soru, T.; Dzeroski, S.; Vanschoren, J.

    2016-01-01

    This paper describes an ontology design pattern for modeling algorithms, their implementations and executions. This pattern is derived from the research results on data mining/machine learning ontologies, but is more generic. We argue that the proposed pattern will foster the development of

  20. Connecting the dots : supporting the implementation of teacher design teams

    NARCIS (Netherlands)

    Binkhorst, Floor

    2017-01-01

    In Teacher Design Teams (TDTs), teachers collaborate on (re)designing educational materials. Although several studies have shown that TDTs can contribute to teachers’ professional development, as well as to sustainable implementation of educational change by using the educational materials they

  1. Best practices of Building Information Modelling (BIM) implementation in design phase for construction project

    Science.gov (United States)

    Kasim, N.; Zainal Abidin, N. A.; Zainal, R.; Sarpin, N.; Rahim, M. H. I. Abd; Saikah, M.

    2017-11-01

    Implementation of Building Information Modelling (BIM) was expected to bring improvement in current practices of Malaysian construction industry. In the design phase, there is a lack of a ready pool of skilled workers who are able to develop BIM strategic plan and effectively utilise it. These create boundaries for BIM nature in Malaysian construction industry specifically in the design phase to achieve its best practices. Therefore, the objectives of this research are to investigate the current practices of BIM implementation in the design phase as well as the best practices factors of BIM implementation in the design phase. The qualitative research approach is carried out through semi-structured interviews with the designers of different organisations which adopt BIM in the design phase. Data collection is analysed by executing content analysis method. From the findings, the best practices factors of BIM implementation in design phase such as the incentive for BIM training, formal approach to monitoring automated Level of Detailing (LOD), run a virtual meeting and improve Industry Foundation Class (IFC). Thus, best practices factors which lead to practices improvements in the design phase of project development which subsequently improves the implementation of BIM in the design phase of Malaysian construction industry.

  2. Operator licensing examiner standards

    International Nuclear Information System (INIS)

    1993-01-01

    The Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining licensees and applicants for reactor operator and senior reactor operator licenses at power reactor facilities pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). The Examiner Standards are intended to assist NRC examiners and facility licensees to better understand the initial and requalification examination processes and to ensure the equitable and consistent administration of examinations to all applicants. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator licensing policy changes

  3. Flexible licensing

    Directory of Open Access Journals (Sweden)

    Martyn Jansen

    2012-07-01

    Full Text Available The case is presented for a more flexible approach to licensing online library resources. Today's distributed education environment creates pressure for UK higher and further education institutions (HEI/FEIs to form partnerships and to develop educational products and roll them out across the globe. Online library resources are a key component of distributed education and yet existing licensing agreements struggle to keep pace with the increasing range of users and purposes for which they are required. This article describes the process of developing a flexible approach to licensing and proposes a new model licence for online library resources which has the adaptability needed in this new global educational landscape. These ideas have been presented and discussed at various workshops across Eduserv's and JISC Collections' higher education and publisher communities, and further consultation is ongoing.

  4. Engineering and licensing progress of the HTR-Module

    Energy Technology Data Exchange (ETDEWEB)

    Weisbrodt, I A

    1988-07-01

    This report deals not only with the latest status of Siemens/Interatom's HTR-Module but also reflects the latest engineering and licensing progress of the HTR-Module against the background of the specified design requirements and of the discussions on passively safe reactors. Therefore, I intend to report also about two examples of the accident analysis - one design basis accident, i.e. the leak-before-break of the reactor pressure vessel and one beyond design accident, i. e. massive water ingress.

  5. Engineering and licensing progress of the HTR-Module

    International Nuclear Information System (INIS)

    Weisbrodt, I.A.

    1988-01-01

    This report deals not only with the latest status of Siemens/Interatom's HTR-Module but also reflects the latest engineering and licensing progress of the HTR-Module against the background of the specified design requirements and of the discussions on passively safe reactors. Therefore, I intend to report also about two examples of the accident analysis - one design basis accident, i.e. the leak-before-break of the reactor pressure vessel and one beyond design accident, i. e. massive water ingress

  6. The design and implementation of online medical record system ...

    African Journals Online (AJOL)

    The design and implementation of online medical record system (OMRS) ... PROMOTING ACCESS TO AFRICAN RESEARCH. AFRICAN JOURNALS ONLINE (AJOL) ... International Journal of Natural and Applied Sciences. Journal Home ...

  7. Design and Implementation of Direct Form FIR Filter

    OpenAIRE

    Kumar, Hanny; Kumar, Kamal

    2016-01-01

    The research article presents the design of the direct form of the Finite Impulse Response (FIR) filter using VHDL programming language. Multimedia technology and broadband communication demand the low power and high performance design applications in Digital Signal Processing (DSP). The digital filters are most important element of the communication system and DSP. In the paper, 7 tap FIR filter is implemented in Xilinx 14.2 software and functionally simulated in Modelsim 10.1 b software. Th...

  8. Voltage-to-frequency converters CMOS design and implementation

    CERN Document Server

    Azcona Murillo, Cristina; Pueyo, Santiago Celma

    2013-01-01

    This book develops voltage-to-frequency converter (VFC) solutions integrated in standard CMOS technology to be used as a part of a microcontroller-based, multisensor interface in the environment of portable applications, particularly within a WSN node.  Coverage includes the total design flow of monolithic VFCs, according to the target application, as well as the analysis, design and implementation of the main VFC blocks, revealing the main challenges and solutions encountered during the design of such high performance cells. Four complete VFCs, each temperature compensated, are fully designed and evaluated: a programmable VFC that includes an offset frequency and a sleep/mode enable terminal; a low power rail-to-rail VFC; and two rail-to-rail differential VFCs.

  9. Trends in nuclear licensing

    Energy Technology Data Exchange (ETDEWEB)

    Dalton, N W [Council for Nuclear Safety, Hennopsmeer, Pretoria (South Africa)

    1990-06-01

    The development of nuclear safety and licensing is briefly reviewed in four stages namely: The Formative Period (1946-1959), The Expansive Period (1960-1969), The Mature Period (1970-1979) and the Apprehensive Period (1980-1989). Particular safety issues in the respective periods are highlighted to indicate the changing emphasis of nuclear licensing over the past thirty years or so. Against this background, nuclear licensing. (author)

  10. Trends in nuclear licensing

    International Nuclear Information System (INIS)

    Dalton, N.W.

    1990-01-01

    The development of nuclear safety and licensing is briefly reviewed in four stages namely: The Formative Period (1946-1959), The Expansive Period (1960-1969), The Mature Period (1970-1979) and the Apprehensive Period (1980-1989). Particular safety issues in the respective periods are highlighted to indicate the changing emphasis of nuclear licensing over the past thirty years or so. Against this background, nuclear licensing. (author)

  11. A Priori Implementation Effort Estimation for HW Design Based on Independent-Path Analysis

    DEFF Research Database (Denmark)

    Abildgren, Rasmus; Diguet, Jean-Philippe; Bomel, Pierre

    2008-01-01

    that with the proposed approach it is possible to estimate the hardware implementation effort. This approach, part of our light design space exploration concept, is implemented in our framework ‘‘Design-Trotter'' and offers a new type of tool that can help designers and managers to reduce the time-to-market factor......This paper presents a metric-based approach for estimating the hardware implementation effort (in terms of time) for an application in relation to the number of linear-independent paths of its algorithms. We exploit the relation between the number of edges and linear-independent paths...... in an algorithm and the corresponding implementation effort. We propose an adaptation of the concept of cyclomatic complexity, complemented with a correction function to take designers' learning curve and experience into account. Our experimental results, composed of a training and a validation phase, show...

  12. Summary of NRR future licensing activities

    International Nuclear Information System (INIS)

    2001-01-01

    In response to a renewed interest in building nuclear power plants, the NRC has created organizations within its major program offices to prepare the NRC staff for new applications (early site permits [ESPs], design certifications, and combined licenses) and to manage special task groups and pro-application reviews of new reactor designs. Activities planned in FY2001 and FY2002 include: (1) evaluating the ability of the NRC staff to support future application reviews under 10 CFR Parts 50 and 52; (2) performing pre-application reviews of the API 000 (a light-water reactor design with passive safety systems), Pebble Bed Modular Reactor (PBMR - a high-temperature gas-cooled reactor design), ESPs, IRIS (an advanced light-water reactor design), and GT-MHR (a high-temperature gas-cooled reactor design); (3) initiating and/or performing related rulemakings that will update 10 CPR Part 52 to reflect lessons learned from certifying three nuclear plant designs, update Tables S-3 and S-4 of 10 CFR Part 51 to address higher burnup fuel considerations and non-LWR advanced designs, and address alternative siting considerations; (4) reactivating the construction inspection program; and, (5) interacting with stakeholders to ensure there is a clear understanding of upcoming activities related to future applications and to solicit stakeholder input. In FY2002 and FY200S, activities are expected to include: (1) managing the reviews of fine new applications resulting from the pre-application reviews (including one design certification, one combined license, and three ESP reviews); (2) managing two pre-application reviews (IRIS and QT-MHR); (3) updating regulatory and review guidance for new applications, i.e., Standard Review Plans (SRPs), Regulatory Guides, and referenced codes and standards, and identifying where enhancements are needed; (4) developing independent codes to analyze the safety of non-LWR designs, with supporting validation testing; and, (5) addressing regulatory

  13. Obstacles to engaging in young driver licensing: Perspectives of parents.

    Science.gov (United States)

    Naz, Sehana; Scott-Parker, Bridie

    2017-02-01

    Young novice drivers remain at greater risk of injury and death despite a wealth of interventions including graduated driver licensing (GDL) programs. The key to implementing safer practices inherent in GDL appears to lie with optimising the role of parents. This qualitative research explored the parent's perspectives of obstacles to engaging in the driver licensing process within a GDL program. Parents also shared advice on what they found helpful, and where relevant, recommended changes in the process to enable safer practices for young drivers. Twenty-three parents (aged 35-60 years, M=49.52, SD=8.01, 11 males) participated in semi-structured interviews regarding licensing experiences with their young driver children. The young drivers included learner (n=11), provisional (restricted/intermediate) (n=9) and open (unrestricted/full) licence drivers (n=3), ranging from 16 to 24 years (M=18.04, SD=2.21, 13 males). Content analysis revealed that most obstacles were encountered at the learner licensing phase, with the parent-reported difficult temperament of the learner driver the most prominent. Unsurprisingly, advice to other parents to be patient and remain calm featured heavily during the same phase. Anxiety from not having control of the vehicle was another obstacle at the learner phase, translating to anxieties for child safety in the early stages of provisional driving. Recommendations for the current GDL included more rigorous road rule testing, with general support for the program, professional driver training at learner and provisional stages facilitated parental engagement through the licensing phases. The findings overwhelmingly suggest a need for parents to be educated regarding their importance in, and of, the driver licensing process, and the efficacy of their instruction, content and practices. Copyright © 2016 Elsevier Ltd. All rights reserved.

  14. The Monticello license renewal project

    International Nuclear Information System (INIS)

    Clauss, J.M.; Harrison, D.L.; Pickens, T.A.

    1993-01-01

    Today, 111 nuclear power plants provide over 20 percent of the electrical energy generated in the United States. The operating license of the oldest operating plant will expire in 2003, one-third of the existing operating licenses will expire by 2010 and the newest plant's operating license will expire in 2033. The National Energy Strategy (NES) prepared by the Department of Energy (DOE) assumes that 70 percent of the current operating plants will continue to operate beyond their current license expiration. Power from current operating plants can assist in ensuring an adequate, diverse, and environmentally acceptable energy supply for economic growth and improved U.S. competitiveness. In order to preserve this energy resource, three major tasks must be successfully completed: (1) establishment of regulations, technical standards, and procedures for the preparation and review of License Renewal Applications (LRAs); (2) development of technical criteria and bases for monitoring, refurbishing or replacing plant equipment; and (3) demonstration of the regulatory process by a plant obtaining a renewed license. Since 1986, the DOE has been working with the nuclear industry and the Nuclear Regulatory Commission (NRC) to establish and demonstrate the option to extend the life of a nuclear power plant by renewing the operating license. The Monticello Lead Plant demonstration project was initiated in September 1988, following the Pilot Plant studies. This paper is primarily focused on the status and insights gained from the Northern States Power Company (NSP) Monticello Lead Plant demonstration project. The following information is included: (1) Current Status - Monticello License Renewal Application; (2) Economic Analysis; (3) License Renewal Regulatory Uncertainty Issues; (4) Key Decisions; (5) Management Structure; (6) Technical and Licensing Perspective; (7) NRC Interactions; (8) Summary

  15. An examination of the perceived teaching competencies of novice alternatively licensed and traditionally licensed high school science teachers

    Science.gov (United States)

    Shea, Kathleen A.

    In most states, there are two routes to teacher licensure; traditional and alternative. The alternative route provides an accelerated entry into the classroom, often without the individual engaging in education coursework or a practicum. No matter the route, teaching skills continue to be learned by novice teachers while in the classroom with the guidance of a school-based mentor. In this study, the perceptions of mentor teachers of traditionally and alternatively licensed high school science teachers were compared with respect to mentees' science teaching competency. Further, the study explored the novice teachers' self-perception of their teaching competency. A survey, consisting of 56 Likert-type questions, was completed by mentors (N = 79) and novice high school science teachers (N = 83) in six northeastern states. The results revealed a statistically significant difference in the perceptions of the mentors of traditionally and alternatively licensed novice high school science teachers in the areas of general pedagogical knowledge, pedagogical content knowledge and professional growth, with more favorable perceptions recorded by mentors of traditionally licensed science teachers. There were no differences in the perceptions of the mentors with respect to novice high school teachers' content knowledge. There was no statistical difference in the self-perceptions of competency of the novice teachers. While alternative routes to licensure in science may be a necessity, the results of this study indicate that the lack of professional preparation may need to be addressed at the school level through the agency of the mentor. This study indicates that mentors must be prepared to provide alternatively licensed novice teachers with different assistance to that given to traditionally licensed novice teachers. School districts are urged to develop mentoring programs designed to develop the teaching competency of all novice teachers regardless of the route that led them

  16. Status of safety issues at licensed power plants: TMI Action Plan requirements, unresolved safety issues, generic safety issues, other multiplant action issues

    International Nuclear Information System (INIS)

    1992-12-01

    This report is to provide a comprehensive description of the implementation and verification status of Three Mile Island (TMI) Action Plan requirements, safety issues designated as Unresolved Safety Issues (USIs), Generic Safety Issues(GSIs), and other Multiplant Actions (MPAs) that have been resolved and involve implementation of an action or actions by licensees. This report makes the information available to other interested parties, including the public. An additional purpose of this NUREG report is to serve as a follow-on to NUREG-0933, ''A Prioritization of Generic Safety Issues,'' which tracks safety issues up until requirements are approved for imposition at licensed plants or until the NRC issues a request for action by licensees

  17. Design & Implementation of Company Database for MME Subcontracting Unit

    CERN Document Server

    Horvath, Benedek

    2016-01-01

    The purpose of this document is to introduce the software stack designed and implemented by me, during my student project. The report includes both the project description, the requirements set against the solution, the already existing alternatives for solving the problem, and the final solution that has been implemented. Reading this document you may have a better understanding of what I was working on for eleven weeks in the summer of 2016.

  18. Guidelines for Implementation of an Advanced Outage Control Center to Improve Outage Coordination, Problem Resolution, and Outage Risk Management

    Energy Technology Data Exchange (ETDEWEB)

    St. Germain, Shawn W. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Farris, Ronald K. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Whaley, April M. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Medema, Heather D. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Gertman, David I. [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-09-01

    This research effort is a part of the Light-Water Reactor Sustainability (LWRS) Program, which is a research and development (R&D) program sponsored by Department of Energy (DOE) and performed in close collaboration with industry R&D programs that provide the technical foundations for licensing and managing the long-term, safe, and economical operation of current nuclear power plants. The LWRS program serves to help the U.S. nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of the plants and extension of the current operating licenses. The purpose of this research is to improve management of nuclear power plant (NPP) outages through the development of an advanced outage control center (AOCC) that is specifically designed to maximize the usefulness of communication and collaboration technologies for outage coordination and problem resolution activities. This technical report for industry implementation outlines methods and considerations for the establishment of an AOCC. This report provides a process for implementation of a change management plan, evaluation of current outage processes, the selection of technology, and guidance for the implementation of the selected technology. Methods are presented for both adoption of technologies within an existing OCC and for a complete OCC replacement, including human factors considerations for OCC design and setup.

  19. Comparison of implementation of selected TMI action plan requirements on operating plants designed by Babcock and Wilcox

    International Nuclear Information System (INIS)

    Thoma, J.O.

    1984-05-01

    This report provides the results of a study conducted by the US Nuclear Regulatory Commission staff to compare the degree to which eight Babcock and Wilcox (B and W) designed licensed nuclear power plants have complied with the requirements in NUREG-0737, Clarification of TMI Action Plan Requirements. The eight licensed operating plants examined are as follows: Arkansas Nuclear One Unit 1 (ANO-1), Crystal River Unit 3, Davis Besse, Oconee Units 1, 2, and 3, Rancho Seco, and Three Mile Island Unit 1 (TMI-1). The purpose of this audit was to establish the progress of the TMI-1 licensee, General Public Utilities (GPU) Nuclear Corporation, in completing the long-term requirements in NUREG-0737 relative to the other B and W licensees examined

  20. Safeguards at NRC licensed facilities: Are we doing enough

    International Nuclear Information System (INIS)

    Asselstine, J.K.

    1986-01-01

    The Nuclear Regulatory Commission is pursuing a number of initiatives in the safeguards area. The Commission is conducting a reassessment of its safeguards design basis threat statements to consider the possible implications of an explosive-laden vehicle for U.S. nuclear safeguards and to examine the comparability of safeguards features at NRC-licensed and DOE facilities. The Commission is also completing action on measures to protect against the sabotage threat from an insider at NRC-licensed facilities, and is examining the potential safety implications of safeguards measures. Finally, the NRC has developed measures to reduce the theft potential for high-enriched uranium

  1. West Valley demonstration project: Implementation of the kerosene mitigation plan

    International Nuclear Information System (INIS)

    Blickwedehl, R.R.; Goodman, J.; Valenti, P.J.

    1987-05-01

    An aggressive program was implemented to mitigate the migration of radioactive kerosene believed to have originated from the West Valley NRC-Licensed Disposal Area (NDA) disposal trenches designated as SH-10 and SH-11 (Special Holes 10 and 11). This report provides a historical background of the events leading to the migration problem, the results of a detailed investigation to determine the location and source of the kerosene migration, the remediation plan to mitigate the migration, and the actions taken to successfully stabilize the kerosene. 7 refs., 19 figs., 1 tab

  2. Guidance for the licensing procedure concerning the application of radiographic equipment

    International Nuclear Information System (INIS)

    1987-01-01

    According to article 4 of the Ordinance on the Implementation of Atomic Safety and Radiation Protection dated 11 October 1984 the operation of radiographic equipment has to be licensed. The personnel and material requirements that are to be fulfilled by a licensee prior to commissioning X-ray or gamma equipment, are discussed in detail

  3. 76 FR 62297 - Privacy Act: Implementation

    Science.gov (United States)

    2011-10-07

    ... Disagreement'' may be filed, the officer designated to receive service of process and the addresses for... identifying documents such as employee identification cards, driver's license, medical cards, or other... identifying documents such as employee identification cards, driver's license, medical cards, or other...

  4. Design and Implementation of Frequency-responsive Thermostat Control

    DEFF Research Database (Denmark)

    Nyeng, Preben; Østergaard, Jacob; Togeby, Mikael

    2010-01-01

    properties and needs of each application, and on the other hand the requirements of the system operator. The control algorithms are implemented on a microcontroller unit that is interfaced with existing thermostats for each application. To validate the control algorithms and overall system design, a series...

  5. [Environmental licensing of major undertakings: possible connection between health and environment].

    Science.gov (United States)

    Silveira, Missifany; Araújo Neto, Mário Diniz de

    2014-09-01

    The prospect of multidisciplinary assessment that considers the environmental impacts on the health of the population during the implementation of potentially polluting projects is incipient in Brazil. Considering the scenario of major undertakings in the country, broadening the outlook on the health and environment relationship based on social and economic development processes striving for environmentally sustainable projects is a key strategy. This article examines the debate on the relationship between the current development model, the risks, the environment and health and discusses the importance of the participation of the health sector in the environmental licensing procedures, which is the instrument of the Environmental Impact Assessment (EIA). Seeking to create more environmentally and socially sustainable territories, the health sector has been looking for opportunities to participate in the licensing processes of major undertakings from the EIA standpoint. Results of research conducted by the Ministry of Health have demonstrated the form of participation in these processes, highlighting the strengths and weaknesses that favor or hinder the increase of preventive actions in public health in the implementation of major undertakings in Brazil.

  6. The Role of Ethnography in the Design and Implementation of IT Systems

    DEFF Research Database (Denmark)

    Simonsen, Jesper

    2009-01-01

    an example from a case where a fully functional prototype of a large Electronic Patient Record (EPR) system was designed, implemented, used as a pilot study, and subjected to evaluations based on ethno- graphic observations. The case demonstrates how a new and important role for ethnography can...... be established as an integral part of iterative approaches to design and organizational implementation of large IT systems. The role of ethnography can be expanded from a descriptive role (describing ex- isting work practices or the situation after a complete implementation) to a constructive role focusing...

  7. ACS sampling system: design, implementation, and performance evaluation

    Science.gov (United States)

    Di Marcantonio, Paolo; Cirami, Roberto; Chiozzi, Gianluca

    2004-09-01

    By means of ACS (ALMA Common Software) framework we designed and implemented a sampling system which allows sampling of every Characteristic Component Property with a specific, user-defined, sustained frequency limited only by the hardware. Collected data are sent to various clients (one or more Java plotting widgets, a dedicated GUI or a COTS application) using the ACS/CORBA Notification Channel. The data transport is optimized: samples are cached locally and sent in packets with a lower and user-defined frequency to keep network load under control. Simultaneous sampling of the Properties of different Components is also possible. Together with the design and implementation issues we present the performance of the sampling system evaluated on two different platforms: on a VME based system using VxWorks RTOS (currently adopted by ALMA) and on a PC/104+ embedded platform using Red Hat 9 Linux operating system. The PC/104+ solution offers, as an alternative, a low cost PC compatible hardware environment with free and open operating system.

  8. Sandia's experience in designing and implementing integrated high security physical protection systems

    International Nuclear Information System (INIS)

    Caskey, D.L.

    1986-01-01

    As DOE's lead laboratory for physical security, Sandia National Laboratories has had a major physical security program for over ten years. Activities have ranged from component development and evaluation, to full scale system design and implementation. This paper presents some of the lessons learned in designing and implementing state-of-the-art high security physical protection systems for a number of government facilities. A generic system design is discussed for illustration purposes. Sandia efforts to transfer technology to industry are described

  9. Alara applied to iter design and operation

    International Nuclear Information System (INIS)

    Uzan-Elbez, Joelle; Rodriguez-Rodrigo, Lina; Porfiri, Maria Teresa; Taylor, Neil; Gordon, Charles; Garin, Pascal; Girard, Jean-Philippe

    2005-01-01

    Based on the existing data on ITER and the safety options for licensing ITER in Cadarache, the present work assesses the application of the as-low-as-reasonably-achievable (ALARA) principle, as it has been implemented in the design of ITER and will be applied during ITER operation, as well as the compliance of the design with EUR/96-29 directive and regulation applicable in France. The preliminary occupational radiation exposure estimate gives a value of about 250 man mSv/a, which is half the annual target for ITER and comes essentially from maintenance activities. Some examples of the approach are presented

  10. Design and implement of pack filter module base on embedded firewall

    Science.gov (United States)

    Tian, Libo; Wang, Chen; Yang, Shunbo

    2011-10-01

    In the traditional security solution conditions, software firewall cannot intercept and respond the invasion before being attacked. And because of the high cost, the hardware firewall does not apply to the security strategy of the end nodes, so we have designed a kind of solution of embedded firewall with hardware and software. With ARM embedding Linux operating system, we have designed packet filter module and intrusion detection module to implement the basic function of firewall. Experiments and results show that that firewall has the advantages of low cost, high processing speed, high safety and the application of the computer terminals. This paper focuses on packet filtering module design and implementation.

  11. Design and implementation of a biomimetic turtle hydrofoil for an autonomous underwater vehicle.

    Science.gov (United States)

    Font, Davinia; Tresanchez, Marcel; Siegentahler, Cedric; Pallejà, Tomàs; Teixidó, Mercè; Pradalier, Cedric; Palacin, Jordi

    2011-01-01

    This paper presents the design and implementation of a turtle hydrofoil for an Autonomous Underwater Vehicle (AUV). The final design of the AUV must have navigation performance like a turtle, which has also been the biomimetic inspiration for the design of the hydrofoil and propulsion system. The hydrofoil design is based on a National Advisory Committee for Aeronautics (NACA) 0014 hydrodynamic profile. During the design stage, four different propulsion systems were compared in terms of propulsion path, compactness, sealing and required power. The final implementation is based on a ball-and-socket mechanism because it is very compact and provides three degrees of freedom (DoF) to the hydrofoil with very few restrictions on the propulsion path. The propulsion obtained with the final implementation of the hydrofoil has been empirically evaluated in a water channel comparing different motion strategies. The results obtained have confirmed that the proposed turtle hydrofoil controlled with a mechanism with three DoF generates can be used in the future implementation of the planned AUV.

  12. Design and Implementation of a Biomimetic Turtle Hydrofoil for an Autonomous Underwater Vehicle

    Science.gov (United States)

    Font, Davinia; Tresanchez, Marcel; Siegentahler, Cedric; Pallejà, Tomàs; Teixidó, Mercè; Pradalier, Cedric; Palacin, Jordi

    2011-01-01

    This paper presents the design and implementation of a turtle hydrofoil for an Autonomous Underwater Vehicle (AUV). The final design of the AUV must have navigation performance like a turtle, which has also been the biomimetic inspiration for the design of the hydrofoil and propulsion system. The hydrofoil design is based on a National Advisory Committee for Aeronautics (NACA) 0014 hydrodynamic profile. During the design stage, four different propulsion systems were compared in terms of propulsion path, compactness, sealing and required power. The final implementation is based on a ball-and-socket mechanism because it is very compact and provides three degrees of freedom (DoF) to the hydrofoil with very few restrictions on the propulsion path. The propulsion obtained with the final implementation of the hydrofoil has been empirically evaluated in a water channel comparing different motion strategies. The results obtained have confirmed that the proposed turtle hydrofoil controlled with a mechanism with three DoF generates can be used in the future implementation of the planned AUV. PMID:22247660

  13. Design and Implementation of a Biomimetic Turtle Hydrofoil for an Autonomous Underwater Vehicle

    Directory of Open Access Journals (Sweden)

    Jordi Palacin

    2011-11-01

    Full Text Available This paper presents the design and implementation of a turtle hydrofoil for an Autonomous Underwater Vehicle (AUV. The final design of the AUV must have navigation performance like a turtle, which has also been the biomimetic inspiration for the design of the hydrofoil and propulsion system. The hydrofoil design is based on a National Advisory Committee for Aeronautics (NACA 0014 hydrodynamic profile. During the design stage, four different propulsion systems were compared in terms of propulsion path, compactness, sealing and required power. The final implementation is based on a ball-and-socket mechanism because it is very compact and provides three degrees of freedom (DoF to the hydrofoil with very few restrictions on the propulsion path. The propulsion obtained with the final implementation of the hydrofoil has been empirically evaluated in a water channel comparing different motion strategies. The results obtained have confirmed that the proposed turtle hydrofoil controlled with a mechanism with three DoF generates can be used in the future implementation of the planned AUV.

  14. Design and Implementation of Microcontroller based Automated Air ...

    African Journals Online (AJOL)

    However, the currently available refrigerator trucks have no dynamically controlled system as expected to be. Therefore, the aim of this paper is to design, simulate and implement microcontroller based air conditioning controller to monitor and control the Refrigerator temperature by using a temperature sensor, LM35 and ...

  15. CEQ regulations called peril to nuclear licensing process

    International Nuclear Information System (INIS)

    O'Neill, J.V.

    1979-01-01

    Court challenges are expected over regulations of the Council on Environmental Quality (CEQ) that were designed to improve nuclear-licensing decisions, but that have actually changed the meanings of National Environmental Policy Act (NEPA) regulations. The legal implications of these changes could, unless resolved, make the licensing process for nuclear facilities even more uncertain. Agency comments are thought to be critical, although the CEQ has declined to release them, and some question the Council's legality. The Nuclear Regulatory Commission faults the CEQ regulations for revising existing law, being inconsistent with the responsibilities of an independent regulatory body, and extending the CEQ's authority beyond the role assigned by NEPA and the President's Executive Order

  16. Graduated driver licensing and differential deterrence: The effect of license type on intentions to violate road rules.

    Science.gov (United States)

    Poirier, Brigitte; Blais, Etienne; Faubert, Camille

    2018-01-01

    In keeping with the differential deterrence theory, this article assesses the moderating effect of license type on the relationship between social control and intention to violate road rules. More precisely, the article has two objectives: (1) to assess the effect of license type on intentions to infringe road rules; and (2) to pinpoint mechanisms of social control affecting intentions to violate road rules based on one's type of driver license (a restricted license or a full license). This effect is examined among a sample of 392 young drivers in the province of Quebec, Canada. Drivers taking part in the Graduated Driver Licensing (GDL) program have limited demerit points and there is zero tolerance for drinking-and-driving. Propensity score matching techniques were used to assess the effect of the license type on intentions to violate road rules and on various mechanisms of social control. Regression analyses were then conducted to estimate the moderating effect of license type. Average treatment effects from propensity score matching analyses indicate that respondents with a restricted license have lower levels of intention to infringe road rules. While moral commitment and, to a lesser extent, the perceived risk of arrest are both negatively associated with intentions to violate road rules, the license type moderates the relationship between delinquent peers and intentions to violate road rules. The effect of delinquent peers is reduced among respondents with a restricted driver license. Finally, a diminished capability to resist peer pressure could explain the increased crash risk in months following full licensing. Copyright © 2017 Elsevier Ltd. All rights reserved.

  17. Internet MEMS design tools based on component technology

    Science.gov (United States)

    Brueck, Rainer; Schumer, Christian

    1999-03-01

    The micro electromechanical systems (MEMS) industry in Europe is characterized by small and medium sized enterprises specialized on products to solve problems in specific domains like medicine, automotive sensor technology, etc. In this field of business the technology driven design approach known from micro electronics is not appropriate. Instead each design problem aims at its own, specific technology to be used for the solution. The variety of technologies at hand, like Si-surface, Si-bulk, LIGA, laser, precision engineering requires a huge set of different design tools to be available. No single SME can afford to hold licenses for all these tools. This calls for a new and flexible way of designing, implementing and distributing design software. The Internet provides a flexible manner of offering software access along with methodologies of flexible licensing e.g. on a pay-per-use basis. New communication technologies like ADSL, TV cable of satellites as carriers promise to offer a bandwidth sufficient even for interactive tools with graphical interfaces in the near future. INTERLIDO is an experimental tool suite for process specification and layout verification for lithography based MEMS technologies to be accessed via the Internet. The first version provides a Java implementation even including a graphical editor for process specification. Currently, a new version is brought into operation that is based on JavaBeans component technology. JavaBeans offers the possibility to realize independent interactive design assistants, like a design rule checking assistants, a process consistency checking assistants, a technology definition assistants, a graphical editor assistants, etc. that may reside distributed over the Internet, communicating via Internet protocols. Each potential user thus is able to configure his own dedicated version of a design tool set dedicated to the requirements of the current problem to be solved.

  18. Optimization strategies for cask design and container loading in long term spent fuel storage

    International Nuclear Information System (INIS)

    2006-12-01

    As delays are incurred in implementing reprocessing and in planning for geologic repositories, storage of increasing quantities of spent fuel for extended durations is becoming a growing reality. Accordingly, effective management of spent fuel continues to be a priority topic. In response, the IAEA has organized a series of meetings to identify cask loading optimisation issues in preparation for a technical publication on Optimization Strategies for Cask/Container Loading in Long Term Spent Fuel Storage. This publication outlines the optimisation process for cask design, licensing and utilization, describing three principal groups of optimization activities in terms of relevant technical considerations such as criticality, shielding, structural design, operations, maintenance and retrievability. The optimization process for cask design, licensing, and utilization is outlined. The general objectives for the design of storage casks, including storage casks that are intended to be transportable, are summarized. The nature of optimization within the design process is described. The typical regulatory and licensing process is outlined, focusing on the roles of safety regulations, the regulator, and the designer/applicant in the optimization process. Based on the foregoing, a description of the three principal groups of optimization activities is provided. The subsequent chapters of this document then describe the specific optimization activities within these three activity groups, in each of the several design disciplines

  19. Licensing aspects of the NPP Temelin IandC replacement project

    International Nuclear Information System (INIS)

    Karpeta, C.

    1997-01-01

    The objections raised against the original design of the instrumentation and control system of the Temelin nuclear power plant are summarized. The nuclear regulatory environment of the Czech Republic is described; the activities of the State Office for Nuclear Safety (SONS) are highlighted. The requirements underlying the licensing of the Temelin IandC replacement project are discussed in some detail. The licensing process adopted by SONS is to a certain degree computer-aided. A database has been developed by SONS; the three-layer structure of the database is described. (A.K.)

  20. Caliko: An Inverse Kinematics Software Library Implementation of the FABRIK Algorithm

    OpenAIRE

    Lansley, Alastair; Vamplew, Peter; Smith, Philip; Foale, Cameron

    2016-01-01

    The Caliko library is an implementation of the FABRIK (Forward And Backward Reaching Inverse Kinematics) algorithm written in Java. The inverse kinematics (IK) algorithm is implemented in both 2D and 3D, and incorporates a variety of joint constraints as well as the ability to connect multiple IK chains together in a hierarchy. The library allows for the simple creation and solving of multiple IK chains as well as visualisation of these solutions. It is licensed under the MIT software license...

  1. Investment issues in nuclear plant license renewal

    International Nuclear Information System (INIS)

    Eynon, R.T.

    1999-01-01

    A method that determines the operating lives for existing nuclear power plants is discussed. These assumptions are the basis for projections of electricity supply through 2020 reported in the Energy Information Administration's (EIA's) Annual Energy Outlook 1999. To determine if plants will seek license renewal, one must first determine if they will be operating to the end of their current licenses. This determination is based on an economic test that assumes an investment of $150/kW will be required after 30 yr of operation for plants with older designs. This expenditure is intended to be equivalent to the cost that would be associated with any of several needs such as a one0time investment to replace aging equipment (steam generators), a series of investments to fix age-related degradation, increases in operating costs, or costs associated with decreased performance. This investment is compared with the cost of building and operating the lowest-cost new plant over the same 10-yr period. If a plant fails this test, it is assumed to be retired after 30 yr of service. All other plants are then considered candidates for license renewal. The method used to determine if it is economic to apply for license renewal and operate plants for an additional 20 yr is to assume that plants face an investment of $250 million after 40 yr of operation to refurbish aging components. This investment is compared with the lowest-cost new plant alternative evaluated over the same 20 yr that the nuclear plant would operate. If the nuclear plant is the lowest cost option, it is projected to continue to operate. EIA projects that it would be economic to extend the operating licenses for 3.7 GW of capacity (6 units)

  2. Lessons Learned from Design and Construction of New US Nuclear Facility

    International Nuclear Information System (INIS)

    Seamans, S. E.; Horvath, D. A.

    2012-01-01

    For reasons related to licensing uncertainty, economic slowdown, and questionable financial backing, no new nuclear facility projects have been undertaken in the United States since the Three Mile Island Incident in 1979; however, a need for such facilities (both nuclear power plants and nuclear fuel facilities) continues and various incentives leading to the start of a nuclear renaissance have occurred. One incentive is a complete overhaul by the US Nuclear Regulatory Commission of the earlier two step licensing process under 10 CFR 50. The earlier approach required first a construction permit and then an operating license, whereas the new approach allows a more streamlined (one step) combined license (COL) approach utilizing Standard Design Certifications via the regulatory framework created by 10 CFR 52. Other incentives include US Government backed loan guarantees as well as private company contributions. One aspect to the new process has been consideration and implementation of many new topic-specific regulations and industry standards which have continued to evolve during the past 30 years in spite of the lack of new plant design and construction activity. Therefore, an Owner attempting a new nuclear facility project under 10 CFR 52 needs to address a myriad of new requirements previously unconsidered. Several new projects including both power plants and fuel facilities have begun the new licensing process with its many new requirements to consider, but a uranium enrichment facility has run the gamut first. This paper will summarize many of the lessons learned from designing, constructing and testing this first new nuclear facility to be built in the US in over 30 years.(author).

  3. 22 CFR 96.30 - State licensing.

    Science.gov (United States)

    2010-04-01

    ... Licensing and Corporate Governance § 96.30 State licensing. (a) The agency or person is properly licensed or... person follows applicable State licensing and regulatory requirements in all jurisdictions in which it provides adoption services. (c) If it provides adoption services in a State in which it is not itself...

  4. 29 Has the licensing ACT 2003 affected levels of violence in England and Wales? A systematic review of hospital and police studies.

    Science.gov (United States)

    Callan, Caitríona; Boyle, Adrian

    2017-12-01

    Population-level legislation has been implemented in many countries to try and address alcohol misuse and related harms, including assault. Most violent incidents in the UK are alcohol-related, with alcohol misuse accounting for a substantial proportion of Accident and Emergency Department attendances. The Licensing Act 2003 aimed to reduce alcohol-related crime and disorder by abolishing set closing times and giving local authorities control over premises licensing in England and Wales. Concerns were raised, however, that greater availability of alcohol would lead to increased consumption and violence. This review examines primary research from hospital and police settings to evaluate whether the implementation of the Act in 2005 reduced or increased violence rates in England and Wales. We performed an inclusive systematic review of the major biomedical databases. We included original research that evaluated changes in violence rates before and after the implementation of the Licensing Act, including hospital- and police- defined measures for this primary outcome. Our secondary outcome was whether there was change in temporal distribution of violent incidents after implementation of the Act. We identified 184 studies. 15 studies were included. The evidence was of overall poor quality, with the majority of included studies being uncontrolled before-after studies. 8 of these studies were conducted in the hospital setting, and 7 were from the police setting. Overall, 7 studies found reduced violence rates after implementation of the Licensing Act, 3 found increased rates, and 5 found no significant change. A subset of 9 papers analysed temporal distribution of violent incidents, 8 finding evidence of temporal displacement of assaults further into the early hours of the morning. This is the most complete analysis to date of the effects of the Licensing Act on violence. There is no evidence for the Act having a significant or consistent effect on community violence

  5. Solid-state tap-changer of transformers: Design, control and implementation

    Energy Technology Data Exchange (ETDEWEB)

    Faiz, Jawad; Siahkolah, Behzad [Center of Excellence on Applied Electromagnetic Systems, School of Electrical and Computer Engineering, University of Tehran, Tehran 1439957131 (Iran, Islamic Republic of)

    2011-02-15

    This paper presents the implementation of a prototype electronic tap-changer of transformer. Mechanical tap-changer has many problems such as low operating speed, short lifetime and heavy size. In order to solve these problems a fully solid-state tap-changer with a new control strategy and optimal configuration is proposed. The design of tap-changer is discussed and bi-directional solid-state power electronics switches are implemented. Following the realization of the tap-changer controller, developed software for such precise control is introduced. To verify the design procedure and optimal configuration and apply the developed software, a prototype low-power tap-changer has been built and tested. (author)

  6. Modeling, Design, and Implementation of a Cloud Workflow Engine Based on Aneka

    OpenAIRE

    Zhou, Jiantao; Sun, Chaoxin; Fu, Weina; Liu, Jing; Jia, Lei; Tan, Hongyan

    2014-01-01

    This paper presents a Petri net-based model for cloud workflow which plays a key role in industry. Three kinds of parallelisms in cloud workflow are characterized and modeled. Based on the analysis of the modeling, a cloud workflow engine is designed and implemented in Aneka cloud environment. The experimental results validate the effectiveness of our approach of modeling, design, and implementation of cloud workflow.

  7. Competency-based education: programme design and challenges to implementation.

    Science.gov (United States)

    Gruppen, Larry D; Burkhardt, John C; Fitzgerald, James T; Funnell, Martha; Haftel, Hilary M; Lypson, Monica L; Mullan, Patricia B; Santen, Sally A; Sheets, Kent J; Stalburg, Caren M; Vasquez, John A

    2016-05-01

    Competency-based education (CBE) has been widely cited as an educational framework for medical students and residents, and provides a framework for designing educational programmes that reflect four critical features: a focus on outcomes, an emphasis on abilities, a reduction of emphasis on time-based training, and promotion of learner centredness. Each of these features has implications and potential challenges for implementing CBE. As an experiment in CBE programme design and implementation, the University of Michigan Master of Health Professions Education (UM-MHPE) degree programme was examined for lessons to be learned when putting CBE into practice. The UM-MHPE identifies 12 educational competencies and 20 educational entrustable professional activities (EPAs) that serve as the vehicle for both learning and assessment. The programme also defines distinct roles of faculty members as assessors, mentors and subject-matter experts focused on highly individualised learning plans adapted to each learner. Early experience with implementing the UM-MHPE indicates that EPAs and competencies can provide a viable alternative to traditional courses and a vehicle for rigorous assessment. A high level of individualisation is feasible but carries with it significant costs and makes intentional community building essential. Most significantly, abandoning a time-based framework is a difficult innovation to implement in a university structure that is predicated on time-based education. © 2016 John Wiley & Sons Ltd.

  8. Design and Implementation of the PALM-3000 Real-Time Control System

    Science.gov (United States)

    Truong, Tuan N.; Bouchez, Antonin H.; Burruss, Rick S.; Dekany, Richard G.; Guiwits, Stephen R.; Roberts, Jennifer E.; Shelton, Jean C.; Troy, Mitchell

    2012-01-01

    This paper reflects, from a computational perspective, on the experience gathered in designing and implementing realtime control of the PALM-3000 adaptive optics system currently in operation at the Palomar Observatory. We review the algorithms that serve as functional requirements driving the architecture developed, and describe key design issues and solutions that contributed to the system's low compute-latency. Additionally, we describe an implementation of dense matrix-vector-multiplication for wavefront reconstruction that exceeds 95% of the maximum sustained achievable bandwidth on NVIDIA Geforce 8800GTX GPU.

  9. Licensing in an International Market

    Science.gov (United States)

    Ferreira, Fernanda A.

    2008-09-01

    We study the effects of entry of a foreign firm on domestic welfare in the presence of licensing, when the entrant is technologically superior to the incumbent. We show that foreign entry increases domestic welfare for sufficiently large technological differences between the firms under both fixed-fee licensing and royalty licensing.

  10. 22 CFR 120.20 - License.

    Science.gov (United States)

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false License. 120.20 Section 120.20 Foreign Relations DEPARTMENT OF STATE INTERNATIONAL TRAFFIC IN ARMS REGULATIONS PURPOSE AND DEFINITIONS § 120.20 License. License means a document bearing the word “license” issued by the Directorate of Defense Trade...

  11. Design, control, and implementation of LCL-filter-based shunt active power filters

    DEFF Research Database (Denmark)

    Tang, Yi; Loh, Poh Chiang; Wang, Peng

    2011-01-01

    This paper concentrates on the design, control and implementation of an LCL-filter-based shunt active power filter (SAPF), which can effectively compensate harmonic currents produced by nonlinear loads in a three-phase three-wire power system. The use of LCL-filter at the output end of SAPF offer......-loop control system, and active damping implemented with fewer current sensors are all addressed here. An analytical design example is finally presented, being supported with experimental results, to verify its effectiveness and practicality.......This paper concentrates on the design, control and implementation of an LCL-filter-based shunt active power filter (SAPF), which can effectively compensate harmonic currents produced by nonlinear loads in a three-phase three-wire power system. The use of LCL-filter at the output end of SAPF offers...

  12. DESIGN AND IMPLEMENTATION OF A VHDL PROCESSOR FOR DCT BASED IMAGE COMPRESSION

    Directory of Open Access Journals (Sweden)

    Md. Shabiul Islam

    2017-11-01

    Full Text Available This paper describes the design and implementation of a VHDL processor meant for performing 2D-Discrete Cosine Transform (DCT to use in image compression applications. The design flow starts from the system specification to implementation on silicon and the entire process is carried out using an advanced workstation based design environment for digital signal processing. The software allows the bit-true analysis to ensure that the designed VLSI processor satisfies the required specifications. The bit-true analysis is performed on all levels of abstraction (behavior, VHDL etc.. The motivation behind the work is smaller size chip area, faster processing, reducing the cost of the chip

  13. Radioisotope thermoelectric generator licensed hardware package and certification tests

    International Nuclear Information System (INIS)

    Goldmann, L.H.; Averette, H.S.

    1994-01-01

    This paper presents the Licensed Hardware package and the Certification Test portions of the Radioisotope Thermoelectric Generator Transportation System. This package has been designed to meet those portions of the Code of Federal Regulations (10 CFR 71) relating to ''Type B'' shipments of radioactive materials. The detailed information for the anticipated license is presented in the safety analysis report for packaging, which is now in process and undergoing necessary reviews. As part of the licensing process, a full-size Certification Test Article unit, which has modifications slightly different than the Licensed Hardware or production shipping units, is used for testing. Dimensional checks of the Certification Test Article were made at the manufacturing facility. Leak testing and drop testing were done at the 300 Area of the US Department of Energy's Hanford Site near Richland, Washington. The hardware includes independent double containments to prevent the environmental spread of 238 Pu, impact limiting devices to protect portions of the package from impacts, and thermal insulation to protect the seal areas from excess heat during accident conditions. The package also features electronic feed-throughs to monitor the Radioisotope Thermoelectric Generator's temperature inside the containment during the shipment cycle. This package is designed to safely dissipate the typical 4500 thermal watts produced in the largest Radioisotope Thermoelectric Generators. The package also contains provisions to ensure leak tightness when radioactive materials, such as a Radioisotope Thermoelectric Generator for the Cassini Mission, planned for 1997 by the National Aeronautics and Space Administration, are being prepared for shipment. These provisions include test ports used in conjunction with helium mass spectrometers to determine seal leakage rates of each containment during the assembly process

  14. 48 CFR 227.7203-4 - License rights.

    Science.gov (United States)

    2010-10-01

    ... Software and Computer Software Documentation 227.7203-4 License rights. (a) Grant of license. The... license, under an irrevocable license granted or obtained by the contractor which developed the software... granted to the Government. The scope of a computer software license is generally determined by the source...

  15. ITER, On the way to call for the license

    International Nuclear Information System (INIS)

    Alejaidre, C.; Girard, J.P.

    2007-01-01

    Full text of publication follows: All the seven ITER Parties have now ratified the lTER Agreement, which was signed in Paris in November last year. On October 24, 2007 the ITER Agreement enters officially into force. The licensing procedure to start construction shall be launched within the coming months in order to start construction at the beginning of 2009. The Host Party, Europe and the Host State, France have already participated together with the ITER Organization (IO) to a public debate to present the project to the neighboring populations (January to May 2006) and other administrative procedures to prepare the site and the roads for heavy loads. According to host state law on licensing of nuclear facilities, IO will send a set of administrative documents including a safety assessment (called Preliminary Safety Report) and public hearing files including impact studies and risk analysis. The review and public hearing are expected mid-08 to be consistent with the start of nuclear building construction on site. The latest update of the design took into account of inputs from: -An internal design review managed through eight specialist groups including safety and licensing, - Host State regulations (technical and QA), which should be fulfilled as quoted in the ITER agreement, - Site adaptation including land configuration, environmental conditions and external hazards. The ITER designers, in close contact with the Participant Teams, are proceeding with the adaptation of the generic design to comply with these new inputs. The codes and standards for all equipment are also under revision in order to fit with the expected requirements, taking into account the procurement sharing agreement and the French regulations. In the earlier stage of ITER design fusion took benefit from fission knowledge, in the present stage fusion is taking the lead as can be demonstrated by the update of the European mechanical code RCC-MR, now ready and updated to the vacuum vessel design

  16. Current status of construction license of PEFP

    International Nuclear Information System (INIS)

    Kim, J. Y.; Cho, J. S.; Min, Y. S.; Nam, J. M.; Jeon, G. P.; Park, S. S.; Jo, J. H.; Song, I. T.

    2012-01-01

    Since 2010 August, PEFP(Proton Engineering Frontier Project)'s Proton Accelerator Research Center has been under construction so far. Generally, in advance of construction startup, many kinds of licenses should be acquired along with the types of construction works. To acquire a license in time, each item should meet the standard by the related regulation, including not only procedural but also content aspect. In the advent of internet era, electronic government system has been adopted in many governmental functions: So is the national construction license acquisition system. Owing to the system, both approval and documentation functions in licensing are integrated in online computer network which provide us simplification in process and easy accessibility to license data. However, aside from these construction licenses, other types of licenses still remain separately managed: Machinery, electric facilities, and so on. Moreover, all the licenses have the priority order and take legal term in processing. So, to avoid any time delay in license acquisition, we organized license hierarchy and found out the priority among them. Thereafter, according to their legal term in approval and acquisition, whole license acquisition schedule was arranged and we completed all the necessary licenses acquisition in time In this study, we summarize the current status of license acquisition on Proton Accelerator Research Center Construction, and manifest how they have been and will be managed systematically

  17. Current status of construction license of PEFP

    Energy Technology Data Exchange (ETDEWEB)

    Kim, J. Y.; Cho, J. S.; Min, Y. S.; Nam, J. M.; Jeon, G. P.; Park, S. S.; Jo, J. H.; Song, I. T. [KAERI, Daejeon (Korea, Republic of)

    2012-10-15

    Since 2010 August, PEFP(Proton Engineering Frontier Project)'s Proton Accelerator Research Center has been under construction so far. Generally, in advance of construction startup, many kinds of licenses should be acquired along with the types of construction works. To acquire a license in time, each item should meet the standard by the related regulation, including not only procedural but also content aspect. In the advent of internet era, electronic government system has been adopted in many governmental functions: So is the national construction license acquisition system. Owing to the system, both approval and documentation functions in licensing are integrated in online computer network which provide us simplification in process and easy accessibility to license data. However, aside from these construction licenses, other types of licenses still remain separately managed: Machinery, electric facilities, and so on. Moreover, all the licenses have the priority order and take legal term in processing. So, to avoid any time delay in license acquisition, we organized license hierarchy and found out the priority among them. Thereafter, according to their legal term in approval and acquisition, whole license acquisition schedule was arranged and we completed all the necessary licenses acquisition in time In this study, we summarize the current status of license acquisition on Proton Accelerator Research Center Construction, and manifest how they have been and will be managed systematically.

  18. Technology Licensing and Firm Innovation

    DEFF Research Database (Denmark)

    Moreira, Solon

    acquisition. The findings indicate that technology licensing is positively related to the number of inventions produced by the licensee in the years subsequent to the licensing deal. Subsequently, I investigate the moderating effect that organizational slack and myopia have on this main relationship....... The findings also suggest that high levels of Organizational Slack (available financial resources) strengthen the positive effect of licensing on innovation. However, higher levels of Organizational Myopia (the extent to which a firm draws on its own knowledge) can decrease the main effect of licensing....

  19. Design and Implementation of a Professional Development Course Series.

    Science.gov (United States)

    Welch, Beth; Spooner, Joshua J; Tanzer, Kim; Dintzner, Matthew R

    2017-12-01

    Objective. To design and implement a longitudinal course series focused on professional development and professional identity formation in pharmacy students at Western New England University. Methods. A four-year, theme-based course series was designed to sequentially and longitudinally impart the values, attributes, and characteristics of a professional pharmacist. Requirements of the course include: goal planning and reflective assignments, submission of "Best Works," attendance at professional meetings, completion of service hours, annual completion of a Pharmacy Professionalism Instrument, attendance at Dean's Seminar, participation in roundtable discussions, and maintenance of an electronic portfolio. Though the Professional Development course series carries no credit, these courses are progression requirements and students are assessed on a pass/fail basis. Results. Course pass rates in the 2015-2016 academic year for all four classes were 99% to 100%, suggesting the majority of students take professional development seriously and are achieving the intended outcomes of the courses. Conclusion. A professional development course series was designed and implemented in the new Doctor of Pharmacy program at Western New England University to enhance the professional identity formation of students.

  20. design and implementation of a web based information system

    African Journals Online (AJOL)

    Admin

    proposed a suitable architecture for the design of a model of object-relational database for it's implementation. The ... oriented and object-relational database so as to be able to apply them in ..... European pattern languages of programming.

  1. Design and Implementation of GSM Based Transformer Phase ...

    African Journals Online (AJOL)

    In this work, the design and implementation of a transformer phase monitoring system, which continuously check for blown fuses on each phases of the distribution transformer was carried out. The system promptly reports any transformer with blown J&P fuse via a preprogrammed SMS which will state the location of the ...

  2. Quality assurance and design control problems associated with the fabrication and use of spent fuel dry storage components

    International Nuclear Information System (INIS)

    Kobetz, T.J.; Matula, T.O.; Shankman, S.F.

    1999-01-01

    This paper presents the concerns of the staff of the U.S. Nuclear Regulatory Commission (NRC) regarding vendor and utility quality assurance (QA) oversight during the design and fabrication of spent fuel dry storage cask (DSC) systems. Deficient QA and design control programmes have resulted in significant enforcement actions against both vendors and utilities. In addition, the utilities, vendors, and NRC, have expended a considerable amount of resources on resolving these problems. As a result, some utilities have been forced to explore other options for long-term storage of spent fuel, including reracking the spent fuel pool and switching DSC vendors. Some vendors stopped fabricating DSCs until appropriate corrective actions were implemented. This resulted in significant financial and operational burdens on both utilities and vendors. In fiscal years 1996 and 1997, NRC reallocated resources from licensing activities to increased inspection and enforcement activities, thus causing delays in the licensing of new DSC designs. It is imperative that vendors and utilities learn from these mistakes and implement effective QA and DC programmes. (author)

  3. 31 CFR 596.309 - Specific license.

    Science.gov (United States)

    2010-07-01

    ... FOREIGN ASSETS CONTROL, DEPARTMENT OF THE TREASURY TERRORISM LIST GOVERNMENTS SANCTIONS REGULATIONS General Definitions § 596.309 Specific license. The term specific license means any license or...

  4. Pharmaceutical new product development: the increasing role of in-licensing.

    Science.gov (United States)

    Edwards, Nancy V

    2008-12-01

    Many pharmaceutical companies are facing a pipeline gap because of the increasing economic burden and uncertainty associated with internal research and development programs designed to develop new pharmaceutical products. To fill this pipeline gap, pharmaceutical companies are increasingly relying on in-licensing opportunities. New business development identifies new pharmaceuticals that satisfy unmet needs and are a good strategic fit for the company, completes valuation models and forecasts, evaluates the ability of the company to develop and launch products, and pursues in-licensing agreements for pharmaceuticals that cannot be developed internally on a timely basis. These agreements involve the transfer of access rights for patents, trademarks, or similar intellectual property from an outside company in exchange for payments. Despite the risks, in-licensing is increasingly becoming the preferred method for pharmaceutical companies with pipeline gaps to bring new pharmaceuticals to the clinician.

  5. The Texas concurrent characterization, licensing, and development process

    Energy Technology Data Exchange (ETDEWEB)

    Avant, R.V. Jr. [Texas Low-Level Radioactive Waste Disposal Authority, Austin, TX (United States)

    1993-03-01

    The 72nd Texas Legislature specifically delineated a 400-square-mile area in southeast Hudspeth County where siting activities would be limited. The Authority was given unprecedented powers of property access and eminent domain and expanded budget authority to conduct site selection, characterization, and licensing. In the summer of 1991, the Authority identified five general siting areas in the prescribed region, and in the fall of 1991, the Authority narrowed the siting area to one large ranch composed of about 16,000 acres--called the Faskin Ranch. Site characterization began in 1991 and will be complete by September 1993. In September 1991, Authority staff began preparing the license application and included all available information on the Faskin Ranch. At its February meeting, the Authority`s board directed staff to submit the license application to the Texas Water Commission (the new Texas radiation control agency). The license application was submitted on March 2, 1992, and on April 15, 1992, the Commission determined that the application was sufficiently complete to begin review. Discrete technical packages such as groundwater hydrology, surface water hydrology, design, etc., will be submitted to the agency for review on the completion of each package. A schedule has been developed to allow the regulators the maximum time possible to review critical technical areas while minimizing the total review period.

  6. THTR steam generator licensing experience as seen by the manufacturer

    International Nuclear Information System (INIS)

    Fricker, H.W.

    1981-01-01

    This paper describes the licensing procedures of the manufacture of the 300 MWe THTR steam generator. The following problems are discussed: operating data, design, materials used, manufacture and installation of the generator, and also quality control

  7. The need for legislative framework (licensing)

    International Nuclear Information System (INIS)

    Krech, H.

    1977-01-01

    For reasons of public acceptance the basis of a licensing system should be laid down in a law, details can be fixed in regulations below the law-level. The competence for licensing nuclear installations should be attributed to one body, which is not a the same time charged with the promotion of nuclear energy. The licensing authority has to be provided with sufficient technical advice, given by experts organized in advisory bodies. Normally a licensing procedure is split into several steps (site approval, construction permit, operation licence), each step can be subdivided. Some general aspects of licensing conditions (personal, technical and financial) as well as of the licensing procedure are outlined. The participation of the public is of particular importance but also involves most intricate problems. The paper concludes with some critical remarks on the role of administrative courts with respect to the licensing of nuclear power plants. (orig.) [de

  8. Adherence to Medical Cannabis Among Licensed Patients in Israel.

    Science.gov (United States)

    Zolotov, Yuval; Baruch, Yehuda; Reuveni, Haim; Magnezi, Racheli

    2016-01-01

    Objectives: To evaluate adherence among Israeli patients who are licensed to use medical cannabis and to identify factors associated with adherence to medical cannabis. Methods: Ninety-five novice licensed patients were interviewed for this cross-sectional study. The questionnaire measured demographics, the perceived patient-physician relationship, and the level of patients' active involvement in their healthcare. In addition, patients were queried about adverse effect(s) and about their overall satisfaction from this medical treatment. Results: Eighty percent ( n =76) has been identified as adherent to medical cannabis use. Variables found associated with adherence were "country of origin" (immigrant status), "type of illness" (cancer vs. non-cancer), and "experiencing adverse effect(s)." Three predictors of adherence were found significant in a logistic regression model: "type of illness" (odds ratio [OR] 0.101), patient-physician relationship (OR 1.406), and level of patient activation (OR 1.132). 71.5% rated themselves being "completely satisfied" or "satisfied" from medical cannabis use. Conclusions: Our findings show a relatively high adherence rate for medical cannabis, as well as relative safety and high satisfaction among licensed patients. Additionally indicated is the need to develop and implement standardized education about this evolving field-to both patients and physicians.

  9. 31 CFR 596.305 - General license.

    Science.gov (United States)

    2010-07-01

    ... FOREIGN ASSETS CONTROL, DEPARTMENT OF THE TREASURY TERRORISM LIST GOVERNMENTS SANCTIONS REGULATIONS General Definitions § 596.305 General license. The term general license means any license or authorization...

  10. Implementation of Traditional Malay Design Values in Contemporary Malay Houses

    OpenAIRE

    Elham Hosseini; Gurupiah Mursib; Raja Nafida Raja Shahminan

    2016-01-01

    Traditional houses are the most essential architectural experience that is in harmony with the people's culture, beliefs, environment and lifestyles. The development of design values in contemporary architecture by tracking traditional design values in architecture paves the way for arguments concerning the implementation of authentic Malay traditional house design values in contemporary Malay houses. In addition, it is hypothesized that the Malay traditional houses theoretically provide a co...

  11. An Approach for Designing and Implementing Middleware in Wireless Sensor Networks

    Directory of Open Access Journals (Sweden)

    Ronald Beaubrun

    2012-03-01

    Full Text Available In this paper, we propose an approach for designing and implementing a middleware for data dissemination in Wireless Sensor Networks (WSNs. The designing aspect considers three perspectives: device, network and application. Each application layer is implemented as an independent Component Object Model (COM Project which offers portability, security, reusability and domain expertise encapsulation. For result analysis, the percentage of success is used as performance parameter. Such analysis reveals that the middleware enables to greatly increase the percentage of success of the messages disseminated in a WSN.

  12. Licensing of safety critical software for nuclear reactors. Common position of seven European nuclear regulators and authorised technical support organisations

    International Nuclear Information System (INIS)

    2010-01-01

    It is widely accepted that the assessment of software cannot be limited to verification and testing of the end product, i.e. the computer code. Other factors such as the quality of the processes and methods for specifying, designing and coding have an important impact on the implementation. Existing standards provide limited guidance on the regulatory and safety assessment of these factors. An undesirable consequence of this situation is that the licensing approaches taken by nuclear safety authorities and by technical support organisations are determined independently with only limited informal technical co-ordination and information exchange. It is notable that several software implementations of nuclear safety systems have been marred by costly delays caused by difficulties in co-ordinating the development and qualification process. It was thus felt necessary to compare the respective licensing approaches, to identify where a consensus already exists, and to see how greater consistency and more mutual acceptance could be introduced into current practices. This report is the result of the work of a group of regulator and safety authorities' experts. The 2007 version was completed at the invitation of the Western European Nuclear Regulators' Association (WENRA). The major result of the work is the identification of consensus and common technical positions on a set of important licensing issues raised by the design and operation of computer based systems used in nuclear power plants for the implementation of safety functions. The purpose is to introduce greater consistency and more mutual acceptance into current practices. To achieve these common positions, detailed consideration was paid to the licensing approaches followed in the different countries represented by the experts of the task force. The report is intended to be useful: - to coordinate regulators' and safety experts' technical viewpoints in the design of regulators' national policies and in revisions

  13. Licensing of safety critical software for nuclear reactors. Common position of seven European nuclear regulators and authorised technical support organisations

    Energy Technology Data Exchange (ETDEWEB)

    2010-07-01

    It is widely accepted that the assessment of software cannot be limited to verification and testing of the end product, i.e. the computer code. Other factors such as the quality of the processes and methods for specifying, designing and coding have an important impact on the implementation. Existing standards provide limited guidance on the regulatory and safety assessment of these factors. An undesirable consequence of this situation is that the licensing approaches taken by nuclear safety authorities and by technical support organisations are determined independently with only limited informal technical co-ordination and information exchange. It is notable that several software implementations of nuclear safety systems have been marred by costly delays caused by difficulties in co-ordinating the development and qualification process. It was thus felt necessary to compare the respective licensing approaches, to identify where a consensus already exists, and to see how greater consistency and more mutual acceptance could be introduced into current practices. This report is the result of the work of a group of regulator and safety authorities' experts. The 2007 version was completed at the invitation of the Western European Nuclear Regulators' Association (WENRA). The major result of the work is the identification of consensus and common technical positions on a set of important licensing issues raised by the design and operation of computer based systems used in nuclear power plants for the implementation of safety functions. The purpose is to introduce greater consistency and more mutual acceptance into current practices. To achieve these common positions, detailed consideration was paid to the licensing approaches followed in the different countries represented by the experts of the task force. The report is intended to be useful: - to coordinate regulators' and safety experts' technical viewpoints in the design of regulators' national

  14. Licensing an assured isolation facility for low-level radioactive waste. Volume 1: Licensing strategy and issues

    International Nuclear Information System (INIS)

    Silverman, D.J.; Bauser, M.A.; Baird, R.D.

    1998-07-01

    This report provides a detailed set of proposed criteria and guidance for the preparation of a license application for an assured isolation facility (AIF). The report is intended to provide a detailed planning basis upon which a prospective applicant may begin pre-licensing discussions with the Nuclear Regulatory Commission and initiate development of a license application. The report may also be useful to the NRC or to state regulatory agencies that may be asked to review such an application. Volume 1 of this report provides background information, and describes the licensing approach and methodology. Volume 2 identifies specific information that is recommended for inclusion in a license application

  15. Overview and current management of computerized adaptive testing in licensing/certification examinations

    Directory of Open Access Journals (Sweden)

    Dong Gi Seo

    2017-07-01

    Full Text Available Computerized adaptive testing (CAT has been implemented in high-stakes examinations such as the National Council Licensure Examination-Registered Nurses in the United States since 1994. Subsequently, the National Registry of Emergency Medical Technicians in the United States adopted CAT for certifying emergency medical technicians in 2007. This was done with the goal of introducing the implementation of CAT for medical health licensing examinations. Most implementations of CAT are based on item response theory, which hypothesizes that both the examinee and items have their own characteristics that do not change. There are 5 steps for implementing CAT: first, determining whether the CAT approach is feasible for a given testing program; second, establishing an item bank; third, pretesting, calibrating, and linking item parameters via statistical analysis; fourth, determining the specification for the final CAT related to the 5 components of the CAT algorithm; and finally, deploying the final CAT after specifying all the necessary components. The 5 components of the CAT algorithm are as follows: item bank, starting item, item selection rule, scoring procedure, and termination criterion. CAT management includes content balancing, item analysis, item scoring, standard setting, practice analysis, and item bank updates. Remaining issues include the cost of constructing CAT platforms and deploying the computer technology required to build an item bank. In conclusion, in order to ensure more accurate estimations of examinees’ ability, CAT may be a good option for national licensing examinations. Measurement theory can support its implementation for high-stakes examinations.

  16. Design and implementation of BESIII online farm

    International Nuclear Information System (INIS)

    Li Fei; Zhu Kejun; Wang Liang; Liu Yingjie; Chinese Academy of Sciences, Beijing

    2007-01-01

    New Beijing spectrometer (BESIII) data acquisition (DAQ) system need handle the high data rates, high speed network transmission and high storage capability requirements. The design and implementation of the BESIII online computing farm with IBM blade server, Linux and other free software are presented. The cluster system is running well currently, able to meet the needs of BESIII experiment and achieved some important results as online software debugging and testing platform. (authors)

  17. Randomized Controlled Trials in Music Therapy: Guidelines for Design and Implementation.

    Science.gov (United States)

    Bradt, Joke

    2012-01-01

    Evidence from randomized controlled trials (RCTs) plays a powerful role in today's healthcare industry. At the same time, it is important that multiple types of evidence contribute to music therapy's knowledge base and that the dialogue of clinical effectiveness in music therapy is not dominated by the biomedical hierarchical model of evidence-based practice. Whether or not one agrees with the hierarchical model of evidence in the current healthcare climate, RCTs can contribute important knowledge to our field. Therefore, it is important that music therapists are prepared to design trials that meet current methodological standards and, equally important, are able to respond appropriately to those design aspects that may not be feasible in music therapy research. To provide practical guidelines to music therapy researchers for the design and implementation of RCTs as well as to enable music therapists to be well-informed consumers of RCT evidence. This article reviews key design aspects of RCTs and discusses how to best implement these standards in music therapy trials. A systematic presentation of basic randomization methods, allocation concealment strategies, issues related to blinding in music therapy trials and strategies for implementation, the use of treatment manuals, types of control groups, outcome selection, and sample size computation is provided. Despite the challenges of meeting all key design demands typical of an RCT, it is possible to design rigorous music therapy RCTs that accurately estimate music therapy treatment benefits.

  18. Current status and perspective of multinational design evaluation program in Korea

    International Nuclear Information System (INIS)

    Sung, Key Yong

    2008-01-01

    The Multinational Design Evaluation Program (MDEP) is a multinational initiative to develop innovative approaches to leverage the resources and knowledge of the national regulatory authorities who will be tasked with the review of new reactor power plant designs. MDEP consisted of three stages: Stage 1 involved multilateral cooperation within existing regulatory frameworks; Stage 2 focused on enhanced multinational cooperation and convergence of codes, standards, and safety goals; and Stage 3 involved implementation of Stage 2 products to facilitate licensing processes for new reactors, including those being developed by the Generation IV International Forum. A year-long pilot project was initiated to assess the feasibility of the Stage 2 goals since October 2006. The main objective of Stage 2, as set in the Terms of Reference (ToR), was to establish reference regulatory practices and regulations to enhance the safety of new nuclear reactor designs. The convergence of regulatory practices and regulations associated with the reactor design reviews should allow for enhanced cooperation among regulators, improving the effectiveness and efficiency of the regulatory design reviews, which are part of each country's licensing process. This is expected to lead to a convergence of codes, standards and safety goals in the participating countries. To this end, a pilot project, consisting of two working groups, was launched. The first working group investigated the licensing basis for new nuclear reactor designs, the scope of design safety reviews and overall safety goals. The second examined regulatory oversight of components manufactured for new nuclear reactors

  19. A pressure ulcer prevention programme specially designed for nursing homes: does it work?

    Science.gov (United States)

    Kwong, Enid W-Y; Lau, Ada T-Y; Lee, Rainbow L-P; Kwan, Rick Y-C

    2011-10-01

    The aim of this study was to evaluate a pressure ulcer prevention programme for nursing homes to ascertain the feasibility of its implementation, impact on care staff and outcomes for pressure ulcer knowledge and skills and pressure ulcer reduction. No pressure ulcer prevention protocol for long-term care settings has been established to date. The first author of this study thus developed a pressure ulcer prevention programme for nursing homes. A quasi-experimental pretest and post-test design was adopted. Forty-one non-licensed care providers and eleven nurses from a government-subsidised nursing home voluntarily participated in the study. Knowledge and skills of the non-licensed care providers were assessed before, immediately after and six weeks after the training course, and pressure ulcer prevalence and incidence were recorded before and during the protocol implementation. At the end of the programme implementation, focus group interviews with the subjects were conducted to explore their views on the programme. A statistically significant improvement in knowledge and skills scores amongst non-licensed care providers was noted. Pressure ulcer prevalence and incidence rates dropped from 9-2·5% and 2·5-0·8%, respectively, after programme implementation. The focus group findings indicated that the programme enhanced the motivation of non-licensed care providers to improve their performance of pressure ulcer prevention care and increased communication and cooperation amongst care staff, but use of the modified Braden scale was considered by nurses to increase their workload. A pressure ulcer prevention programme for nursing homes, which was feasible and acceptable, with positive impact and outcome in a nursing home was empirically developed. The study findings can be employed to modify the programme and its outcomes for an evaluation of effectiveness of the programme through a randomised controlled trial. © 2011 Blackwell Publishing Ltd.

  20. How to implement and apply robust design: insights from industrial practice

    DEFF Research Database (Denmark)

    Krogstie, Lars; Ebro, Martin; Howard, Thomas J.

    2015-01-01

    . Empirical findings are based on a series of semi-structured interviews with four major engineering companies in Northern Europe. We present why they were motivated to use RD, how it has been implemented and currently applied. Success factors for solving implementation challenges are also presented......Robust design (RD) is a framework for designing products and processes which perform consistently in spite of variations. Although it is well described in literature, research shows limited industrial application. The purpose of this paper is to describe and discuss industrial best-practice on RD...... have all been successful in using RD but with quite different approaches, depending on, for example, their organisational culture, and (3) Not just management commitment, but also true management competencies in RD are essential for a successful implementation. The paper is aimed at professionals...

  1. Licensing aspects regarding the RBMN project

    International Nuclear Information System (INIS)

    Cuccia, Valeria; Sacramento, Arivaldo M.; Aleixo, Bruna L.; Ferreira, Vinicius V.M.

    2013-01-01

    The licensing process of a waste disposal facility is a complex and demanding undertaking. It proceeds in phases, starting with the site selection and ending many decades later, when the radionuclides decayed and no longer offer possible hazard. That is one of the reasons why the licensing process for the Brazilian repository for low and intermediate level radioactive waste (RBMN Project) is a challenge for all the technicians involved. Besides that, the only national experience associated to this subject arose after a radiological accident in the State of Goias, in 1987. Two different institutions are involved in this licensing process: IBAMA, for environmental licensing, and CNEN, for nuclear licensing. Both of them will evaluate the possible impacts caused by the waste disposal, so it is essential to avoid conflicts and duplications of activities. The RBMN project has different teams for each main activity, and one of them is the Licensing group. This team has been planning the licensing activities for the repository, studying the legal framework and estimating costs and execution time for each step. This paper presents the status of the licensing activities regarding to the RBMN project done by the CNEN staff. (author)

  2. Designing, Developing, and Implementing Diversity Training: Guidelines for Practitioners.

    Science.gov (United States)

    Kincaid, Tanna M.; Horner, Erin R.

    1997-01-01

    Discusses diversity in the workplace and offers guidelines for practitioners in designing, developing, and implementing diversity training. Highlights include linking the diversity initiative to the organization's mission, cultural climate assessments, reviewing policies and procedures, needs assessment, learner analysis, establishing objectives,…

  3. Implementation of a Collaborative Series of Classroom-Based Undergraduate Research Experiences Spanning Chemical Biology, Biochemistry, and Neurobiology.

    Science.gov (United States)

    Kowalski, Jennifer R; Hoops, Geoffrey C; Johnson, R Jeremy

    2016-01-01

    Classroom undergraduate research experiences (CUREs) provide students access to the measurable benefits of undergraduate research experiences (UREs). Herein, we describe the implementation and assessment of a novel model for cohesive CUREs focused on central research themes involving faculty research collaboration across departments. Specifically, we implemented three collaborative CUREs spanning chemical biology, biochemistry, and neurobiology that incorporated faculty members' research interests and revolved around the central theme of visualizing biological processes like Mycobacterium tuberculosis enzyme activity and neural signaling using fluorescent molecules. Each CURE laboratory involved multiple experimental phases and culminated in novel, open-ended, and reiterative student-driven research projects. Course assessments showed CURE participation increased students' experimental design skills, attitudes and confidence about research, perceived understanding of the scientific process, and interest in science, technology, engineering, and mathematics disciplines. More than 75% of CURE students also engaged in independent scientific research projects, and faculty CURE contributors saw substantial increases in research productivity, including increased undergraduate student involvement and academic outputs. Our collaborative CUREs demonstrate the advantages of multicourse CUREs for achieving increased faculty research productivity and traditional CURE-associated student learning and attitude gains. Our collaborative CURE design represents a novel CURE model for ongoing laboratory reform that benefits both faculty and students. © 2016 J. R. Kowalski et al. This article is distributed by The American Society for Cell Biology under license from the author(s). Two months after publication it is available to the public under an Attribution–Noncommercial–Share Alike 3.0 Unported Creative Commons License (http://creativecommons.org/licenses/by-nc-sa/3.0).

  4. Managing Licensing in a Market for Technology

    DEFF Research Database (Denmark)

    Arora, Ashish; Rønde, Thomas; Fosfuri, Andrea

    the technology makes licensing decisions—to centralized licensing. The business unit has superior information about licensing opportunities but may not have the appropriate incentives because its rewards depend upon product market performance. If licensing is decentralized, the business unit forgoes valuable...... licensing opportunities since the rewards for licensing are (optimally) weaker than those for product market profits. This distortion is stronger when production-based incentives are more powerful, making centralization more attractive. Growth of technology markets favors centralization and drives higher...

  5. Experience gained in the production of licensable safety-critical software for Darlington NGS

    International Nuclear Information System (INIS)

    Crane, R.H.

    1992-01-01

    The Darlington Nuclear Generating Station is a new station, consisting of four 935 Mw units, built by Ontario Hydro, on the north shore of Lake Ontario, approximately 50 miles east of Toronto. In May, 1987, the first of the four units of this station was approaching the point where Ontario Hydro would be requesting a license to load fuel, and then proceed to first criticality. At this point, however, the regulatory authority, the Atomic Energy Control Board (AECB) started to show increasing concerns related to the Trip Computer Software associated with Darlington's newly-designed computerized shutdown systems. The concerns centered around whether or not the safety reliability, reviewability, and maintainability of this software could be demonstrated by Ontario Hydro or the system designer, Atomic Energy of Canada Limited (AECL). In order to back up the validity of their concerns, they hired a well-known consultant, who reviewed the code, and made recommendations concerning its design, implementation, and documentation. Considerable effort was required by Ontario Hydro and AECL in order to comply with those recommendations. This paper describes those efforts, outlines the difficulties encountered, and assesses the lessons learned from them

  6. Cask development, testing, and licensing

    International Nuclear Information System (INIS)

    Quinn, G.J.; Haelsig, R.T.; Warrant, M.M.

    1986-01-01

    The NuPac 125-B Rail Cask was developed to provide a safe means of transporting the damaged core of Three Mile Island Unit 2 from the TMI site at Middletown, PA, to the Idaho National Engineering laboratory (INEL) at Idaho Falls, ID. The development of the NuPac 125-B Rail Cask posed two engineering and technical management challenges; Licensing Strategy - The NuPac 125-B Rail Cask represented the first irradiated fuel rail cask developed within the United States in the past decade, a decade characterized by changing nuclear regulations, and Accelerated Schedule - The TMI-2 defueling schedule demanded a cask development schedule one-third as long as normally required. These challenges governed the overall development and licensing process for the cask. First, a high degree of conservation was incorporated into the design to allow quick, simplified demonstrations of adequacy to regulatory staff. Second, redundant design techniques were employed in all areas of uncertainty. The testing program eliminated performance uncertainties and validated predictions and predictive models. Drop tests of a quarter-scale model of the cask were conducted, and results were correlated with analytic predictions to verify structural and mechanical performance of the cask. Full-scale tests of the canisters were conducted to verify structural behavior of canister internals which provide criticality control. This paper describes the testing program for the NuPac 125-B Rail Cask, presents results therefrom, and correlates findings with Regulation 10 CFR 71 of the U.S. Nuclear Regulatory Commission

  7. Designing reversible arithmetic, logic circuit to implement micro-operation in quantum computation

    International Nuclear Information System (INIS)

    Kalita, Gunajit; Saikia, Navajit

    2016-01-01

    The futuristic computing is desired to be more power full with low-power consumption. That is why quantum computing has been a key area of research for quite some time and is getting more and more attention. Quantum logic being reversible, a significant amount of contributions has been reported on reversible logic in recent times. Reversible circuits are essential parts of quantum computers, and hence their designs are of great importance. In this paper, designs of reversible circuits are proposed using a recently proposed reversible gate for arithmetic and logic operations to implement various micro-operations (simple add and subtract, add with carry, subtract with borrow, transfer, incrementing, decrementing etc., and logic operations like XOR, XNOR, complementing etc.) in a reversible computer like quantum computer. The two new reversible designs proposed here for half adder and full adders are also used in the presented reversible circuits to implement various microoperations. The quantum costs of these designs are comparable. Many of the implemented micro-operations are not seen in previous literatures. The performances of the proposed circuits are compared with existing designs wherever available. (paper)

  8. AGING MANAGMENT OF REACTOR COOLANT SYSTEM MECHANICAL COMPONENTS FOR LICENSE RENEWAL

    International Nuclear Information System (INIS)

    SUBUDHI, M.; MORANTE, R.; LEE, A.D.

    2002-01-01

    The reactor coolant system (RCS) mechanical components that require an aging management review for license renewal include the primary loop piping and associated connections to other support systems, reactor vessel, reactor vessel internals, pressurizer. steam generators, reactor coolant pumps, and all other inter-connected piping, pipe fittings, valves, and bolting. All major RCS components are located inside the reactor building. Based on the evaluation findings of recently submitted license renewal applications for pressurized water reactors, this paper presents the plant programs and/or activities proposed by the applicants to manage the effects of aging. These programs and/or activities provide reasonable assurance that the intended function(s) of these mechanical components will be maintained for the period of extended operation. The license renewal application includes identification of RCS subcomponents that are within the scope of license renewal and are vulnerable to age-related degradation when exposed to environmental and operational conditions. determination of the effects of aging on their intended safety functions. and implementation of the aging management programs and/or activities including both current and new programs. Industry-wide operating experience, including generic communication by the NRC, is part of the aging management review for the RCS components. In addition, this paper discusses time-limited aging analyses associated with neutron embrittlement of the reactor vessel beltline region and thermal fatigue

  9. Regulatory systems-based licensing guidance documentation

    International Nuclear Information System (INIS)

    Delligatti, M.S.

    1991-01-01

    The US Nuclear Regulatory Commission (NRC) has developed a series of licensing guidance documents based on the regulatory requirements in Part 60 of Title 10 of the Code of Federal Regulations (10 CFR Part 60). This regulatory systems-based approach to licensing guidance documentation relies on the definition of the high-level waste repository in 10 CFR Part 60. A document which is important for the frame-work it gives to other programmatic licensing guidance is the Draft Regulatory Guide open-quotes Format and Content for the License Application for the High-Level Waste Repositoryclose quotes (FCRG). The FCRG describes a format and content acceptable to NRC for a high-level waste repository license application pursuant to the requirements of 10 CFR Part 60. Other licensing guidance documents will be compatible with the FCRG

  10. License renewal in the United States

    International Nuclear Information System (INIS)

    Brons, Jack

    2002-01-01

    Full text: Nuclear plants in the United States are licensed for 40 years, a length specified in the Atomic Energy Act of 1954, which laid out much of the regulatory basis for the commercial nuclear industry. The Act, however, made provision for license renewal. The original 40-year license period was chosen arbitrarily by the U.S. Congress because it was the typical period over which utilities recovered their investment in electricity generating plants. Nuclear plants, however, are subject to a rigorous program of Nuclear Regulatory Commission oversight, maintenance and equipment replacement. In effect, they must be in the same operating condition on the last day of their licenses as they were on the first. As the industry matured, it became apparent that there was no physical limitation on the continued operation of nuclear plants past 40 years. The industry turned its attention toward license renewal. When the issue was first raised, the NRC considered stringent process equivalent to seeking a new operating license for each plant. The complexity, length and cost of the process made it unlikely that many nuclear plants would seek license renewal. The nuclear industry worked successfully with NRC on the application of generic principles to license renewal, however, and in 1995, the NRC issued an efficient, tightly-focused rule that made license renewal a safe, viable option. To extend the operating license for a reactor, a company must demonstrate to the NRC that aging effects will be adequately managed during the renewal terms, thus ensuring equipment functionality. The rule allows licensees to apply for extensions of up to 20 years. The first license renewal application was filed in 1998 by the owner of the two-unit Calvert Cliffs plant. Shortly thereafter, an application was filed for the three-unit Oconee Nuclear Station. The NRC renewed the licenses for all five units in 2000, and since then, five more licenses have been renewed. The NRC has received 37

  11. 75 FR 76757 - Licensing Support System Advisory Review Panel

    Science.gov (United States)

    2010-12-09

    ... provide advice on the fundamental issues of design and development of an electronic information management... the disposal of high-level radioactive waste, and on the operation and maintenance of the system. This electronic information management system was known as the Licensing Support System (LSS). In November, 1998...

  12. Regulatory analysis for final rule on nuclear power plant license renewal

    International Nuclear Information System (INIS)

    1991-12-01

    This regulatory analysis provides the supporting information for the final rule (10 CFR Part 54) that defines the Nuclear Regulatory Commission's requirements for renewing the operating licenses of commercial nuclear power plants. A set of four specific alternatives for the safety review of license renewal applications is defined and evaluated. These are: Alternative A-current licensing basis; Alternative B-extension of Alternative A to require assessment and managing of aging; Alternative C -- extension of Alternative B to require assessment of design differences against selected new-plant standards using probabilistic risk assessment; and Alternative D -- extension of Alternative B to require compliance with all new-plant standards. A quantitative comparison of the four alternatives in terms of impact-to-value ratio is presented, and Alternative B is the most cost-beneficial safety review alternative

  13. DESIGN AND IMPLEMENTATION OF DYNAMIC SYMBOLS IN DYNAMIC GIS

    Institute of Scientific and Technical Information of China (English)

    2001-01-01

    Many Internet-GIS have been implemented on the web and they are increasingly bec oming an important part of multimedia cartography that has much more users as co mpared to traditional GIS production media.Internet GIS technology has provided the GIS dynamic information acquisition w ith technical support.Also,the visualization technology of electronic map ha s provided tools for GIS symbols with dynamic characteristics.On the basis of GI S dynamic information acquisition,the design idea and implementation methods of dynamic symbols in dynamic GIS are presented in this article.

  14. Design Innovations and Implementation Challenges - A Case of Smart Textiles in Future Hospital Interiors

    DEFF Research Database (Denmark)

    Mogensen, Jeppe; Jørgensen, Poul-Erik; Poulsen, Søren Bolvig

    2014-01-01

    Concerned with the overall challenges of implementing design innovations, this paper relates to the specific case of applying smart textiles in future hospital interiors. The methodological approach is inspired by design thinking and implementation processes, and through the scope of a developed ...

  15. Implementation application Concerto in ANAV for planning design modifications

    International Nuclear Information System (INIS)

    Alonso, S.; Llona, S.

    2014-01-01

    The aim of this paper is to describe the process of implementation in ANAV of this methodology in engineering design, which has improved the results in the execution of projects by reducing multitasking, task synchronization and resources without detailed and fixed schedules. (Author)

  16. Optimization of infobutton design and Implementation: A systematic review.

    Science.gov (United States)

    Teixeira, Miguel; Cook, David A; Heale, Bret S E; Del Fiol, Guilherme

    2017-10-01

    Infobuttons are clinical decision tools embedded in the electronic health record that attempt to link clinical data with context sensitive knowledge resources. We systematically reviewed technical approaches that contribute to improved infobutton design, implementation and functionality. We searched databases including MEDLINE, EMBASE, and the Cochrane Library database from inception to March 1, 2016 for studies describing the use of infobuttons. We selected full review comparative studies, usability studies, and qualitative studies examining infobutton design and implementation. We abstracted usability measures such as user satisfaction, impact, and efficiency, as well as prediction accuracy of infobutton content retrieval algorithms and infobutton adoption/interoperability. We found 82 original research studies on infobuttons. Twelve studies met criteria for detailed abstraction. These studies investigated infobutton interoperability (1 study); tools to help tailor infobutton functionality (1 study); interventions to improve user experience (7 studies); and interventions to improve content retrieval by improving prediction of relevant knowledge resources and information needs (3 studies). In-depth interviews with implementers showed the Health Level Seven (HL7) Infobutton standard to be simple and easy to implement. A usability study demonstrated the feasibility of a tool to help medical librarians tailor infobutton functionality. User experience studies showed that access to resources with which users are familiar increased user satisfaction ratings; and that links to specific subsections of drug monographs increased information seeking efficiency. However, none of the user experience improvements led to increased usage uptake. Recommender systems based on machine learning algorithms outperformed hand-crafted rules in the prediction of relevant resources and clinicians' information needs in a laboratory setting, but no studies were found using these techniques

  17. Improving care for patients whose recovery is uncertain. The AMBER care bundle: design and implementation.

    Science.gov (United States)

    Carey, Irene; Shouls, Susanna; Bristowe, Katherine; Morris, Michelle; Briant, Linda; Robinson, Carole; Caulkin, Ruth; Griffiths, Mathew; Clark, Kieron; Koffman, Jonathan; Hopper, Adrian

    2015-12-01

    Despite preferences to the contrary, 53% of deaths in England occur in hospital. Difficulties in managing clinical uncertainty can result in delayed recognition that a person may be approaching the end of life, and a failure to address his/her preferences. Planning and shared decision-making for hospital patients need to improve where an underlying condition responds poorly to acute medical treatment and there is a risk of dying in the next 1-2 months. This paper suggests an approach to improve this care. A care bundle (the AMBER care bundle) was designed by a multiprofessional development team, which included service users, utilising the model for improvement following an initial scoping exercise. The care bundle includes two identification questions, four subsequent time restricted actions and systematic daily follow-up. This paper describes the development and implementation of a care bundle. From August 2011 to July 2012, 638 patients received care supported by the AMBER care bundle. In total 42.8% died in hospital and a further 14.5% were readmitted as emergencies within 30 days of discharge. Clinical outcome measures are in development. It has been possible to develop a care bundle addressing a complex area of care which can be a lever for cultural change. The implementation of the AMBER care bundle has the potential to improve care of clinically uncertain hospital patients who may be approaching the end of life by supporting their recognition and prompting discussion of their preferences. Outcomes associated with its use are currently being formally evaluated. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/

  18. Design and Implementation of Linux Access Control Model

    Institute of Scientific and Technical Information of China (English)

    Wei Xiaomeng; Wu Yongbin; Zhuo Jingchuan; Wang Jianyun; Haliqian Mayibula

    2017-01-01

    In this paper,the design and implementation of an access control model for Linux system are discussed in detail. The design is based on the RBAC model and combines with the inherent characteristics of the Linux system,and the support for the process and role transition is added.The core idea of the model is that the file is divided into different categories,and access authority of every category is distributed to several roles.Then,roles are assigned to users of the system,and the role of the user can be transited from one to another by running the executable file.

  19. Status report on the HFR conversion and re-licensing project

    International Nuclear Information System (INIS)

    Wijtsma, F.G.

    2003-01-01

    In 1999 the HFR license holder (JRC, Petten, the Netherlands) initiated a project to study the conversion of the HFR from HEU to LEU. The first phase of this project consisted of a parametric study to determine the optimum fuel element and control rod design within given boundary conditions such as geometry, density, performance and cycle length. Results of this study are a 22 plates fuel element (550 g 235 U) at a density of 4.8 g.cm -3 and a 17 plates control rod (440 g 235 U). The second phase contains all aspects related to the conversion including a full-scale test irradiation of a prototype LEU element. The actual conversion of the HFR requires a new license. For this reason the re-licensing project has started in 2001. In this context many studies have been performed e.g. Risk Scoping Study, Safety Analyses, TOPA (Technical, Operational, Personnel and Administrative) evaluation. The license application will be based on a new Safety Report and an Environmental Impact Statement and will be submitted to the competent Authorities at the end of October 2003. (author)

  20. Design and Implementation of MOD-6 Synchronous Counter using VHDL

    Directory of Open Access Journals (Sweden)

    P. Y. Dibal

    2013-08-01

    Full Text Available This paper deals with the design of a MOD-6 synchronous counter using VHDL (VHSIC Hardware Description Language. The VHSIC stands for Very High Speed Integrated Circuit. Using this approach, the behaviour of the counter is the most important aspect of the design. In the first section, the paper introduced counters in general, and their areas of specialization, like frequency synthesizers. The synchronous counter was then introduced, stating the behaviour of the flip-flops that make the counter. The modulus of a counter was defined. In the second section, the Xilinx ISE (Integrated Simulation Environment and the ISIM (Integrated Simulator were presented and briefly described with their respective snapshots. The structure of a typical VHDL code was presented, which included LIBRARY, ENTITY, and ARCHITECTURE. Each of these structures was then briefly described. The main work in this paper was then presented. The count sequence steps were stated as . VHDL was used to model the counter to count through six steps, outputting count values according to desired steps. The hardware implementation of the design was presented, where the implementation process was described, with a supporting diagram, followed by the floor-planning technique, in which the PORTS described in the VHDL design were assigned to the physical pins of the XC3S1000 FPGA (Field Programmable Gate Array chip. The final steps of the hardware implementation process were then presented. These include bitstream generation and download to target device. The third section of the paper presented the results obtained. Simulation/timing results of the design were presented, showing the output of the counter at each state with respect to the clock signal. The result of the synthesis of the design was presented, which showed the FPGA area with the exact location of the pins on the FPGA chip. Finally, the fourth section presented the conclusion arrived at, in respect of the design that was carried

  1. Design and implementation of an inter-agency, multi-mission space flight operations network interface

    Science.gov (United States)

    Byrne, R.; Scharf, M.; Doan, D.; Liu, J.; Willems, A.

    2004-01-01

    An advanced network interface was designed and implemented by a team from the Jet Propulsion Lab with support from the European Space Operations Center. This poster shows the requirements for the interface, the design, the topology, the testing and lessons learned from the whole implementation.

  2. 78 FR 18527 - Implementation of Competitive Bidding for Commercial Broadcast and Instructional Television Fixed...

    Science.gov (United States)

    2013-03-27

    ... Broadcast and Instructional Television Fixed Service Licenses AGENCY: Federal Communications Commission... Implementation of Competitive Bidding for Commercial Broadcast and Instructional Television Fixed Service... for Commercial Broadcast and Instructional Television Fixed Service Licenses, MM Docket No. 97- 234 et...

  3. Licensing of away-from-reactor (AFR) installations

    International Nuclear Information System (INIS)

    Gray, P.L.

    1980-01-01

    Storage of spent fuel at Away-From-Reactor (AFR) installations will allow reactors to continue to operate until reprocessing or other fuel disposal means are available. AFR installations must be licensed by the Nuclear Regulatory Commission (NRC). Although wide experience in licensing reactors exists, the licensing of an AFR installation is a relatively new activity. Only one has been licensed to date. This paper delineates the requirements for licensing an AFR installation and projects a licensing schedule. Because the NRC is developing specific AFR requirements, this schedule is based primarily on draft NRC documents. The major documents needed for an AFR license application are similar to those for a reactor. They include: a Safety Analysis Report (SAR), and Environmental Report (ER), safeguards and security plans, decommissioning plans, proposed technical specifications, and others. However, the licensing effort has one major difference in that for AFR installations it will be a one-step effort, with follow-up, rather than the two-step process used for reactors. The projected licensing schedule shows that the elapsed time between filing an application and issuance of a license will be about 32 months, assuming intervention. The legal procedural steps will determine the time schedule and will override considerations of technical complexity. A license could be issued in about 14 months in the absence of intervention

  4. FHR Generic Design Criteria

    Energy Technology Data Exchange (ETDEWEB)

    Flanagan, George F [ORNL; Holcomb, David Eugene [ORNL; Cetiner, Sacit M [ORNL

    2012-06-01

    The purpose of this document is to provide an initial, focused reference to the safety characteristics of and a licensing approach for Fluoride-Salt-Cooled High-Temperature Reactors (FHRs). The document does not contain details of particular reactor designs nor does it attempt to identify or classify either design basis or beyond design basis accidents. Further, this document is an initial attempt by a small set of subject matter experts to document the safety and licensing characteristics of FHRs for a larger audience. The document is intended to help in setting the safety and licensing research, development, and demonstration path forward. Input from a wider audience, further technical developments, and additional study will be required to develop a consensus position on the safety and licensing characteristics of FHRs. This document begins with a brief overview of the attributes of FHRs and then a general description of their anticipated safety performance. Following this, an overview of the US nuclear power plant approval process is provided that includes both test and power reactors, as well as the role of safety standards in the approval process. The document next describes a General Design Criteria (GDC) - based approach to licensing an FHR and provides an initial draft set of FHR GDCs. The document concludes with a description of a path forward toward developing an FHR safety standard that can support both a test and power reactor licensing process.

  5. Quasi-experimental designs in practice-based research settings: design and implementation considerations.

    Science.gov (United States)

    Handley, Margaret A; Schillinger, Dean; Shiboski, Stephen

    2011-01-01

    Although randomized controlled trials are often a gold standard for determining intervention effects, in the area of practice-based research (PBR), there are many situations in which individual randomization is not possible. Alternative approaches to evaluating interventions have received increased attention, particularly those that can retain elements of randomization such that they can be considered "controlled" trials. Methodological design elements and practical implementation considerations for two quasi-experimental design approaches that have considerable promise in PBR settings--the stepped-wedge design, and a variant of this design, a wait-list cross-over design, are presented along with a case study from a recent PBR intervention for patients with diabetes. PBR-relevant design features include: creation of a cohort over time that collects control data but allows all participants (clusters or patients) to receive the intervention; staggered introduction of clusters; multiple data collection points; and one-way cross-over into the intervention arm. Practical considerations include: randomization versus stratification, training run in phases; and extended time period for overall study completion. Several design features of practice based research studies can be adapted to local circumstances yet retain elements to improve methodological rigor. Studies that utilize these methods, such as the stepped-wedge design and the wait-list cross-over design, can increase the evidence base for controlled studies conducted within the complex environment of PBR.

  6. Free Software Licenses and Other Free Licenses: Genetic Code of Digital Common Goods

    OpenAIRE

    Marco Ciurcina

    2017-01-01

    This article explores the history and describes the main features of free software licenses and other free licenses in an attempt to shed light on the reasons for their success in promoting individual behaviors converging towards the collective construction of digital commons.

  7. Safeguards at NRC licensed facilities: Are we doing enough

    International Nuclear Information System (INIS)

    Asselstine, J.K.

    1986-01-01

    Safeguards at the Nuclear Regulatory Commission (NRC) facilities are discussed in this paper. The NRC is pursuing a number of initiatives in the safeguards area. The Commission is conducting a reassessment of its safeguards design basis threat statements to consider the possible implications of an explosive-laden vehicle for U.S. nuclear safeguards and to examine the comparability of safeguards features at NRC-licensed and DOE facilities. The Commission is also completing action on measures to protect against the sabotage threat from an insider at NRC-licensed facilities, and is examining the potential safety implications of safeguards measures. Finally, the NRC has developed measures to reduce the theft potential for high-enriched uranium

  8. Managing Licensing in a Market for Technology

    DEFF Research Database (Denmark)

    Arora, Ashish; Fosfuri, Andrea; Rønde, Thomas

    2013-01-01

    , we find that interdependency across business units may result in more, not less, decentralization. Furthermore, even though centralization results in less information, centralized licensing deals are larger. Our model conforms to the existing evidence that reports heterogeneity across firms in both......Technology licensing is an important means for companies to extract more value from their intellectual assets. We build a model that helps understand how licensing activity should be organized within large corporations. More specifically, we compare decentralization—where the business unit using...... the technology makes licensing decisions—to centralized licensing. The business unit has superior information about licensing opportunities but may not have the appropriate incentives because its rewards depend on product market performance. If licensing is decentralized, the business unit forgoes valuable...

  9. Design and Implementation of Temperature Controller for a Vacuum Distiller

    OpenAIRE

    Muslim, M. Aziz; N., Goegoes Dwi; F., Ahmad Salmi; R., Akhbar Prachaessardhi

    2014-01-01

    This paper proposed design and implementation of temperature controller for a vacuum distiller. The distiller is aimed to provide distillation process of bioethanol in nearly vacuum condition. Due to varying vacuum pressure, temperature have to be controlled by manipulating AC voltage to heating elements. Two arduino based control strategies have been implemented, PID control and Fuzzy Logic control. Control command from the controller was translated to AC drive using TRIAC based dimmer circu...

  10. Responsibility without legal authority? Tackling alcohol-related health harms through licensing and planning policy in local government.

    Science.gov (United States)

    Martineau, F P; Graff, H; Mitchell, C; Lock, K

    2014-09-01

    The power to influence many social determinants of health lies within local government sectors that are outside public health's traditional remit. We analyse the challenges of achieving health gains through local government alcohol control policies, where legal and professional practice frameworks appear to conflict with public health action. Current legislation governing local alcohol control in England and Wales is reviewed and analysed for barriers and opportunities to implement effective population-level health interventions. Case studies of local government alcohol control practices are described. Addressing alcohol-related health harms is constrained by the absence of a specific legal health licensing objective and differences between public health and legal assessments of the relevance of health evidence to a specific place. Local governments can, however, implement health-relevant policies by developing local evidence for alcohol-related health harms; addressing cumulative impact in licensing policy statements and through other non-legislative approaches such as health and non-health sector partnerships. Innovative local initiatives-for example, minimum unit pricing licensing conditions-can serve as test cases for wider national implementation. By combining the powers available to the many local government sectors involved in alcohol control, alcohol-related health and social harms can be tackled through existing local mechanisms. © The Author 2013. Published by Oxford University Press on behalf of Faculty of Public Health.

  11. Main aspects in licensing of a type B(U) package design for the transport of 12.95 PBq of cobalt 60

    International Nuclear Information System (INIS)

    Lopez Vietri, J.R.; Novo, R.G.; Bianchi, A.J.

    1995-01-01

    This paper points out the relevant technical issues related to the licensing process, of a type B(U) package design, with cylindrical form and 9.3 ton mass, approved by the Argentine Competent Authority for the transport of 12.95 PBq of cobalt 60 as special form radioactive material. It is briefly described the heat transfer analysis, the structural performance under impulsive loads and the shielding calculation under both normal and accidental conditions of transport, as well as the comparative analysis of the results obtained from design, pre-operational tests and independent evaluation performed by the Argentine Competent Authority to verify the compliance with the Regulations for the Safe Transport of Radioactive Material of the International Atomic Energy Agency. (author). 14 refs., 1 fig., tabs

  12. Implementation of tuberculosis infection control measures in designated hospitals in Zhejiang Province, China: are we doing enough to prevent nosocomial tuberculosis infections?

    Science.gov (United States)

    Chen, Bin; Liu, Min; Gu, Hua; Wang, Xiaomeng; Qiu, Wei; Shen, Jian; Jiang, Jianmin

    2016-03-03

    Tuberculosis (TB) infection control measures are very important to prevent nosocomial transmission and protect healthcare workers (HCWs) in hospitals. The TB infection control situation in TB treatment institutions in southeastern China has not been studied previously. Therefore, the aim of this study was to investigate the implementation of TB infection control measures in TB-designated hospitals in Zhejiang Province, China. Cross-sectional survey using observation and interviews. All TB-designated hospitals (n=88) in Zhejiang Province, China in 2014. Managerial, administrative, environmental and personal infection control measures were assessed using descriptive analyses and univariate logistic regression analysis. The TB-designated hospitals treated a median of 3030 outpatients (IQR 764-7094) and 279 patients with confirmed TB (IQR 154-459) annually, and 160 patients with TB (IQR 79-426) were hospitalised in the TB wards. Most infection control measures were performed by the TB-designated hospitals. Measures including regular monitoring of TB infection control in high-risk areas (49%), shortening the wait times (42%), and providing a separate waiting area for patients with suspected TB (46%) were sometimes neglected. N95 respirators were available in 85 (97%) hospitals, although only 44 (50%) hospitals checked that they fit. Hospitals with more TB staff and higher admission rates of patients with TB were more likely to set a dedicated sputum collection area and to conduct annual respirator fit testing. TB infection control measures were generally implemented by the TB-designated hospitals. Measures including separation of suspected patients, regular monitoring of infection control practices, and regular fit testing of respirators should be strengthened. Infection measures for sputum collection and respirator fit testing should be improved in hospitals with lower admission rates of patients with TB. Published by the BMJ Publishing Group Limited. For permission to

  13. Integrated Design and Implementation of Embedded Control Systems with Scilab.

    Science.gov (United States)

    Ma, Longhua; Xia, Feng; Peng, Zhe

    2008-09-05

    Embedded systems are playing an increasingly important role in control engineering. Despite their popularity, embedded systems are generally subject to resource constraints and it is therefore difficult to build complex control systems on embedded platforms. Traditionally, the design and implementation of control systems are often separated, which causes the development of embedded control systems to be highly timeconsuming and costly. To address these problems, this paper presents a low-cost, reusable, reconfigurable platform that enables integrated design and implementation of embedded control systems. To minimize the cost, free and open source software packages such as Linux and Scilab are used. Scilab is ported to the embedded ARM-Linux system. The drivers for interfacing Scilab with several communication protocols including serial, Ethernet, and Modbus are developed. Experiments are conducted to test the developed embedded platform. The use of Scilab enables implementation of complex control algorithms on embedded platforms. With the developed platform, it is possible to perform all phases of the development cycle of embedded control systems in a unified environment, thus facilitating the reduction of development time and cost.

  14. Integrated Design and Implementation of Embedded Control Systems with Scilab

    Directory of Open Access Journals (Sweden)

    Zhe Peng

    2008-09-01

    Full Text Available Embedded systems are playing an increasingly important role in control engineering. Despite their popularity, embedded systems are generally subject to resource constraints and it is therefore difficult to build complex control systems on embedded platforms. Traditionally, the design and implementation of control systems are often separated, which causes the development of embedded control systems to be highly timeconsuming and costly. To address these problems, this paper presents a low-cost, reusable, reconfigurable platform that enables integrated design and implementation of embedded control systems. To minimize the cost, free and open source software packages such as Linux and Scilab are used. Scilab is ported to the embedded ARM-Linux system. The drivers for interfacing Scilab with several communication protocols including serial, Ethernet, and Modbus are developed. Experiments are conducted to test the developed embedded platform. The use of Scilab enables implementation of complex control algorithms on embedded platforms. With the developed platform, it is possible to perform all phases of the development cycle of embedded control systems in a unified environment, thus facilitating the reduction of development time and cost.

  15. Microgrid Controller Design, Implementation, and Deployment: A Journey from Conception to Implementation at the Philadelphia Navy Yard

    Energy Technology Data Exchange (ETDEWEB)

    Uluski, R.; Kumar, J.; Venkata, S. S. Mani; Vishwakarma, D.; Schneider, K.; Mehrizi-Sani, Ali; Terry, Rudy; Agate, Will

    2017-07-01

    The Philadelphia Navy Yard is a fast-evolving community microgrid, currently home to over 150 companies and four Navy activity centers occupying nearly 7 million ft2 of buildings in which approximately 12,000 people are employed. The Navy Yard (TNY) is a national center of excellence for energy research, education, and commercialization, focused specifically on community microgrid design and development. TNY microgrid is equipped with the most cost-effective and sustainable means for meeting electric capacity and energy needs through renewable resources, energy efficiency, and distribution grid infrastructure. This article briefly describes how the community microgrid was conceived and planned to produce a great success story of microgrid implementation and the details of the design, development, and implementation of the TNY microgrid controller.

  16. Free Software Licenses and Other Free Licenses: Genetic Code of Digital Common Goods

    Directory of Open Access Journals (Sweden)

    Marco Ciurcina

    2017-06-01

    Full Text Available This article explores the history and describes the main features of free software licenses and other free licenses in an attempt to shed light on the reasons for their success in promoting individual behaviors converging towards the collective construction of digital commons.

  17. Robust Design Impact Metrics: Measuring the effect of implementing and using Robust Design

    DEFF Research Database (Denmark)

    Ebro, Martin; Olesen, Jesper; Howard, Thomas J.

    2014-01-01

    Measuring the performance of an organisation’s product development process can be challenging due to the limited use of metrics in R&D. An organisation considering whether to use Robust Design as an integrated part of their development process may find it difficult to define whether it is relevant......, and afterwards measure the effect of having implemented it. This publication identifies and evaluates Robust Design-related metrics and finds that 2 metrics are especially useful: 1) Relative amount of R&D Resources spent after Design Verification and 2) Number of ‘change notes’ after Design Verification....... The metrics have been applied in a case company to test the assumptions made during the evaluation. It is concluded that the metrics are useful and relevant, but further work is necessary to make a proper overview and categorisation of different types of robustness related metrics....

  18. The Atomic Energy Control Board requirements for the radioisotope licensing of a radiopharmaceutical facility

    International Nuclear Information System (INIS)

    Kennedy, P.

    1980-01-01

    Items that must be addressed by an applicant for a radioisotope license in Canada are described. Site, design and operating conditions, safety assessment, organization, emergency procedures and operating policies and procedures must be described to the Atomic Energy Control Board (AECB), in support of any license application. All information submitted in support of the application is subject to AECB's policy on public access to that information. (OT)

  19. Implementation of a Project-Based Telecommunications Engineering Design Course

    Science.gov (United States)

    Aliakbarian, Hadi; Soh, Ping Jack; Farsi, Saeed; Xu, Hantao; Van Lil, Emmanuel H. E. M. J. C.; Nauwelaers, Bart K. J. C.; Vandenbosch, Guy A. E.; Schreurs, Dominique M. M.-P.

    2014-01-01

    This paper describes and discusses the implementation of a project-based graduate design course in telecommunications engineering. This course, which requires a combination of technical and soft skills for its completion, enables guided independent learning (GIL) and application of technical knowledge acquired from classroom learning. Its main…

  20. Institutional Design and the Implementation of the African Peace ...

    African Journals Online (AJOL)

    The relationship between, on the one hand, the design of the African Peace Security Architecture (APSA), and implementation of APSA's institutional provisions, on the other, remains less well understood, contrary to scholarly optimism on the future of security cooperation in Africa. For instance, security cooperation in ...

  1. Compulsory licensing in Canada and Thailand: comparing regimes to ensure legitimate use of the WTO rules.

    Science.gov (United States)

    Lybecker, Kristina M; Fowler, Elisabeth

    2009-01-01

    This paper examines two recent examples of compulsory licensing legislation: one globally embraced regime and one internationally controversial regime operating under the same WTO rules. In particular, we consider Canadian legislation and the use of compulsory licensing for HIV/AIDS drugs destined for a developing country. This is then contrasted with the conditions under which Thai authorities are pursuing compulsory licenses, the outcomes of their compulsory licenses, as well as the likely impact of the Thai policy. Finally, we construct a rubric to evaluate characteristics of a successful regime. This is used to analyze the Canadian and Thai regimes and frame the expected implications of each national policy. It is hoped that the assessment will guide changes to compulsory licensing design to ensure that legitimate regimes are embraced while illegitimate ones are disallowed.

  2. Licensing Teachers: Lessons from Other Professions.

    Science.gov (United States)

    Haberman, Martin

    1986-01-01

    The licensing of teachers should be modeled against professions similar to teaching rather than professions like medicine and architecture that are vastly different. Applying similar licensing practices can raise the status of teaching. Ignoring these licensing practices will prevent teachers from functioning as professionals. (MD)

  3. Safety and licensing issues for Indian PHWRs

    International Nuclear Information System (INIS)

    Srinivasan, G.R.; Das, M.

    1997-01-01

    India has achieved competency in design, construction, commissioning and operation of Pressurized Heavy Water Reactor based Nuclear Power Plants and has completed more than 120 reactor operating years with an extremely satisfactory safety record. In this paper, the safety management in NPCIL and operational safety aspects are discussed, licensing and regulatory approach is described and some of the main safety issues for Indian PHWRs are brought out. (author)

  4. Practical iterative learning control with frequency domain design and sampled data implementation

    CERN Document Server

    Wang, Danwei; Zhang, Bin

    2014-01-01

    This book is on the iterative learning control (ILC) with focus on the design and implementation. We approach the ILC design based on the frequency domain analysis and address the ILC implementation based on the sampled data methods. This is the first book of ILC from frequency domain and sampled data methodologies. The frequency domain design methods offer ILC users insights to the convergence performance which is of practical benefits. This book presents a comprehensive framework with various methodologies to ensure the learnable bandwidth in the ILC system to be set with a balance between learning performance and learning stability. The sampled data implementation ensures effective execution of ILC in practical dynamic systems. The presented sampled data ILC methods also ensure the balance of performance and stability of learning process. Furthermore, the presented theories and methodologies are tested with an ILC controlled robotic system. The experimental results show that the machines can work in much h...

  5. Preparing for Construction and Operation of Geological Repositories - Challenges to the Regulator and the Implementer. Proceedings of the Joint RF/IGSC Workshop, Issy-les-Moulineaux, France, 25-27 January 2012

    International Nuclear Information System (INIS)

    2014-01-01

    diverse reflection of the various developmental levels of the different geological disposal programmes, ranging from general information on organisations and their licensing regimes, to specific information on technical, regulatory, managerial, administrative and procedural issues. This joint workshop was attended by a balanced mix of implementers and regulators from 14 countries and international organisations (e.g. IAEA, EU). Following the introductory session (Session 1), implementers and regulators from various national programmes (e.g. Finland, Sweden, Canada, Switzerland, etc.) presented their experiences and viewpoints on issues related to construction and operation of geological disposal facilities in Session 2. Session 3 of the workshop focused on industrial feasibility of construction in which key safety issues that must be addressed were presented and discussed. Session 4 continued to explore the issue of industrial feasibility but with the focus switched to the operation of geological repositories. Main operational issues and how to address accidents and disturbances in the design of the various disposal systems were presented. The impact of retrievability on the design and operation of a repository was also examined. The last session of the workshop, Session 5, evaluated various licensing aspects during repository development. Specifically, this session looked into how a licensing process affects the implementation of a repository and also the effect of optimization on late design modifications. To engage participants in more in-depth discussions on the presented topics and also to encourage professional exchange, 3 round table discussions were carried out in Sessions 3-5, to discuss the targeted questions. Results of the group discussions were reported by the rapporteurs. A synthesis of all presentations and conclusions of each session is provided in this document

  6. VLSI architecture and design for the Fermat Number Transform implementation

    Energy Technology Data Exchange (ETDEWEB)

    Pajayakrit, A.

    1987-01-01

    A new technique of sectioning a pipelined transformer, using the Fermat Number Transform (FNT), is introduced. Also, a novel VLSI design which overcomes the problems of implementing FNTs, for use in fast convolution/correlation, is described. The design comprises one complete section of a pipelined transformer and may be programmed to function at any point in a forward or inverse pipeline, so allowing the construction of a pipelined convolver or correlator using identical chips, thus the favorable properties of the transform can be exploited. This overcomes the difficulty of fitting a complete pipeline onto one chip without resorting to the use of several different designs. The implementation of high-speed convolver/correlator using the VLSI chips has been successfully developed and tested. For impulse response lengths of up to 16 points the sampling rates of 0.5 MHz can be achieved. Finally, the filter speed performance using the FNT chips is compared to other designs and conclusions drawn on the merits of the FNT for this application. Also, the advantages and limitations of the FNT are analyzed, with respect to the more conventional FFT, and the results are provided.

  7. Licensing of nuclear and radioactive installations in Peru

    International Nuclear Information System (INIS)

    Medina Gironzini, E.

    1987-01-01

    In Peru, the Regulation for Ionizing Radiation Sources is applied, which establishes the norms and procedures to follow in the nuclear and radioactive installations of the country in order to assure their correct operation as concerns to the nuclear safety and radiological protection, allowing the emission of the respective licenses. As for the nuclear facilities, this authorization includes the Previous License, the Construction License and the Operation License (provisional and definitive) and for radioactive facilities and equipment generating ionizing radiations: the Construction License and the Operation License. The personnel also require a license that can be an operator license (as for nuclear reactors) or a supervisor license (for nuclear and radioactive facilities). In spite of the above mentioned regulation and its long enforcement period, less than 10% of radioactive facilities in this country are licensed, due to different problems which will be solved in the medium term. (Author)

  8. Whom to Choose as License Partner?

    DEFF Research Database (Denmark)

    Laursen, Keld; Reichstein, Toke; Trombini, Giulia

    2013-01-01

    between technology and market forces: if partners are market distant, the likelihood of technology license contractual partnership decreases with partners’ technological distance. Using data on the formation of license partnerships in the global biopharmaceutical industry over the period 1994......This paper investigates the matching of firms on the market for technology. The paper forwards two dimensions along which license formation occurs: technology and product-market. Both sides of the market search for a partner representing potential for high technology synergies to maximize licensing...

  9. Exporting the Canadian licensing program

    International Nuclear Information System (INIS)

    Whelan, D.J.

    1981-06-01

    This paper deals with the problems of an overseas regulatory agency in licensing a Canadian-supplied nuclear plant which is referenced to a plant in Canada. Firstly, the general problems associated with the use of a reference plant are discussed. This is followed by a discussion of specific problems which arise from the licensing practices in Canada. The paper concludes with recommendations to simplify the task of demonstrating the licensability of an overseas CANDU plant

  10. The licensing support system (LSS): Who should operate it and will it work?

    International Nuclear Information System (INIS)

    Macnabb, M.L.; Pflum, C.

    1991-01-01

    The development of the mammoth Licensing Support System (LSS), a management information system intended to handle documentation relevant to the licensing application of the DOE for the High Level Nuclear Waste Repository is not conforming to statute, regulation or intent. At the present stage of its development, it is a quagmire of legal, regulatory and technical difficulties which has the DOE and the NRC arguing over its implementation and budget. This paper examines some of the failures of the system and concludes that many of the DOE functions should now be transferred to a disinterested and independent third party under the auspices of the NRC in order to meet the intent of its creators

  11. 7 CFR 6.32 - Globalization of licenses.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 1 2010-01-01 2010-01-01 false Globalization of licenses. 6.32 Section 6.32 Agriculture Office of the Secretary of Agriculture IMPORT QUOTAS AND FEES Dairy Tariff-Rate Import Quota Licensing § 6.32 Globalization of licenses. If the Licensing Authority determines that entries of an article...

  12. 42 CFR 431.710 - Provisional licenses.

    Science.gov (United States)

    2010-10-01

    ... Licensing Nursing Home Administrators § 431.710 Provisional licenses. To fill a position of nursing home... 42 Public Health 4 2010-10-01 2010-10-01 false Provisional licenses. 431.710 Section 431.710 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES...

  13. Product Licenses Database Application

    CERN Document Server

    Tonkovikj, Petar

    2016-01-01

    The goal of this project is to organize and centralize the data about software tools available to CERN employees, as well as provide a system that would simplify the license management process by providing information about the available licenses and their expiry dates. The project development process is consisted of two steps: modeling the products (software tools), product licenses, legal agreements and other data related to these entities in a relational database and developing the front-end user interface so that the user can interact with the database. The result is an ASP.NET MVC web application with interactive views for displaying and managing the data in the underlying database.

  14. Design and Implementation of the CEBAF Element Database

    International Nuclear Information System (INIS)

    Larrieu, Theodore; Slominski, Christopher; Joyce, Michele

    2011-01-01

    With inauguration of the CEBAF Element Database (CED) in Fall 2010, Jefferson Lab computer scientists have taken a first step toward the eventual goal of a model-driven accelerator. Once fully populated, the database will be the primary repository of information used for everything from generating lattice decks to booting front-end computers to building controls screens. A particular requirement influencing the CED design is that it must provide consistent access to not only present, but also future, and eventually past, configurations of the CEBAF accelerator. To accomplish this, an introspective database schema was designed that allows new elements, element types, and element properties to be defined on-the-fly without changing table structure. When used in conjunction with the Oracle Workspace Manager, it allows users to seamlessly query data from any time in the database history with the exact same tools as they use for querying the present configuration. Users can also check-out workspaces and use them as staging areas for upcoming machine configurations. All Access to the CED is through a well-documented API that is translated automatically from original C++ into native libraries for script languages such as perl, php, and TCL making access to the CED easy and ubiquitous. Notice: Authored by Jefferson Science Associates, LLC under U.S. DOE Contract No. DE-AC05-06OR23177. The U.S. Government retains a non-exclusive, paid-up, irrevocable, world-wide license to publish or reproduce this manuscript for U.S. Government purposes.

  15. Designing a Deeply Digital Science Curriculum: Supporting Teacher Learning and Implementation with Organizing Technologies

    Science.gov (United States)

    Leary, Heather; Severance, Samuel; Penuel, William R.; Quigley, David; Sumner, Tamara; Devaul, Holly

    2016-01-01

    This paper examines the impacts of technology (e.g., Chromebooks, Google Drive) on teacher learning and student activity in the development and implementation of a deeply digital high school biology unit. Using design-based implementation research, teachers co-designed with researchers and curriculum specialists a student-centered unit aligned to…

  16. Considerations about the licensing process of special nuclear industrial facilities

    Energy Technology Data Exchange (ETDEWEB)

    Talarico, M.A., E-mail: talaricomarco@hotmail.com [Marinha do Brasil, Rio de Janeiro, RJ (Brazil). Coordenacao do Porgrama de Submarino com Propulsao Nuclear; Melo, P.F. Frutuoso e [Coordenacao dos Programas de Pos-Graduacao em Engenharia (COPPE/UFRJ), Rio de Janeiro, RJ (Brazil). Programa de Engenharia Nuclear

    2015-07-01

    This paper brings a discussion about the challenges involved in the development of a new kind of nuclear facility in Brazil, a naval base for nuclear submarines, with attention to the licensing process and considerations about the risk-informed decision making application to the licensing process. Initially, a model of such a naval base, called in this work, special industrial facility, is proposed, with its systems and respective sets of basic requirements, in order to make it possible the accomplishment of the special industrial facility support function to the nuclear submarine. A discussion about current challenges to overcome in this project is presented: the challenges due to the new characteristics of this type of nuclear facility; existence of several interfaces between the special industrial facilities systems and nuclear submarine systems in design activities; lack of specific regulation in Brazil to allow the licensing process of special industrial facilities by the nuclear safety authority; and comments about the lack of information from reference nuclear facilities, as is the case with nuclear power reactors (for example, the German Grafenrheinfeld nuclear plant is the reference plant for the Brazilian Angra 2 nuclear plant). Finally, in view of these challenges, an analysis method of special industrial facility operational scenarios to assist the licensing process is proposed. Also, considerations about the application of risk-informed decision making to the special industrial facility activity and licensing process in Brazil are presented. (author)

  17. Considerations about the licensing process of special nuclear industrial facilities

    International Nuclear Information System (INIS)

    Talarico, M.A.; Melo, P.F. Frutuoso e

    2015-01-01

    This paper brings a discussion about the challenges involved in the development of a new kind of nuclear facility in Brazil, a naval base for nuclear submarines, with attention to the licensing process and considerations about the risk-informed decision making application to the licensing process. Initially, a model of such a naval base, called in this work, special industrial facility, is proposed, with its systems and respective sets of basic requirements, in order to make it possible the accomplishment of the special industrial facility support function to the nuclear submarine. A discussion about current challenges to overcome in this project is presented: the challenges due to the new characteristics of this type of nuclear facility; existence of several interfaces between the special industrial facilities systems and nuclear submarine systems in design activities; lack of specific regulation in Brazil to allow the licensing process of special industrial facilities by the nuclear safety authority; and comments about the lack of information from reference nuclear facilities, as is the case with nuclear power reactors (for example, the German Grafenrheinfeld nuclear plant is the reference plant for the Brazilian Angra 2 nuclear plant). Finally, in view of these challenges, an analysis method of special industrial facility operational scenarios to assist the licensing process is proposed. Also, considerations about the application of risk-informed decision making to the special industrial facility activity and licensing process in Brazil are presented. (author)

  18. Design and implement of BESIII online histogramming software

    International Nuclear Information System (INIS)

    Li Fei; Wang Liang; Liu Yingjie; Chinese Academy of Sciences, Beijing; Zhu Kejun; Zhao Jingwei

    2007-01-01

    The online histogramming software is an important part of the BESIII DAQ (Data Acquisition) system. This article introduces the main requirements and design of the online histogramming software and presents how to produce, transmit and gather histograms in the distributed environment in the current software implement. The article also illustrate one smart, simple and easy to expand way of setup with xml configure database. (authors)

  19. Selection, training, qualification and licensing of Three Mile Island reactor operating personnel

    International Nuclear Information System (INIS)

    Eytchison, R.M.

    1980-01-01

    The various programs which were intended to staff Three Mile Island with competent, trained operators and supervisors are reviewed. The analysis includes a review of the regulations concerning operator training and licensing, and describes how the requirements were implemented by the NRC, Metropolitan Edison Company, and Babcock and Wilcox Company. Finally the programs conducted by these three organisations are evaluated. (U.K.)

  20. Licensing plan for UMTRA project disposal sites

    International Nuclear Information System (INIS)

    1993-09-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Office developed a plan to define UMTRA Project licensing program objectives and establish a process enabling the DOE to document completion of remedial actions in compliance with 40 CFR 1 92 and the requirements of the NRC general license. This document supersedes the January 1987 Project Licensing Plan (DOE, 1987). The plan summarizes the legislative and regulatory basis for licensing, identifies participating agencies and their roles and responsibilities, defines key activities and milestones in the licensing process, and details the coordination of these activities. This plan provides an overview of the UMTRA Project from the end of remedial actions through the NRC's acceptance of a disposal site under the general license. The licensing process integrates large phases of the UMTRA Project. Other programmatic UMTRA Project documents listed in Section 6.0 provide supporting information