WorldWideScience

Sample records for design alternative ii

  1. An alternative LEU design for the FRM-II

    International Nuclear Information System (INIS)

    Hanan, N.A.; Mo, S.C.; Smith, R.S.; Matos, J.E.

    1997-02-01

    The Alternative LEU Design for the FRM-II proposed by the RERTR Program at Argonne National Laboratory (ANL) has a compact core consisting of a single fuel element that uses LEU silicide fuel with a uranium density of 4.5 g/cm[sup 3] and has a power level of 32 MW. Both the HEU design by the Technical University of Munich (TUM) and the alternative LEU design by ANL have the same fuel lifetime (50 days) and the same neutron flux performance (8 x 10[sup 14] n/cm[sup 2]/s in the reflector). LEU silicide fuel with 4.5 g/cm[sup 3] has been thoroughly tested and is fully-qualified, licensable, and available now for use in a high flux reactor such as the FRM-II. Computer models for the HEU and LEU designs have been exchanged between TUM and ANL and discrepancies have been resolved. The following issues are addressed: qualification of HEU and LEU silicide fuels, stability of the fuel plates, gamma heating in the heavy water reflector, a hypothetical accident involving the configuration of the reflector, a loss of primary coolant flow transient due to an interrupted power supply, the radiological consequences of larger fission product and plutonium inventories in the LEU core, and cost and schedule. Calculations were also done to address the possibility that new high density LEU fuels could be developed that would allow conversion of the TUM HEU design to LEU fuel. Based on the excellent results for the Alternative LEU Design that were obtained in these analyses, the RERTR Program concludes that all of the major technical issues regarding use of LEU fuel instead of HEU fuel in the FRM-II have been successfully resolved and that it is definitely feasible to use LEU fuel in the FRM-II without compromising the safety or performance of the facility

  2. An alternative LEU design for the FRM-II

    International Nuclear Information System (INIS)

    Hanan, N.A.; Mo, S.C.; Smith, R.S.; Matos, J.E.

    1996-01-01

    The Alternative LEU Design for the FRM-II proposed by the RERTR Program at Argonne National Laboratory (ANL) has a compact core consisting of a single fuel element that uses LEU silicide fuel with a uranium density of 4.5 g/cm 3 and has a power level of 32 MW. Both the HEU design by the Technical University of Munich (TUM) and the alternative LEU design by ANL have the same fuel lifetime (50 days) and the same neutron flux performance. LEU silicide fuel with 4.5 g/cm 3 has been thoroughly tested and is fully-qualified, licensable, and available now for use in a high flux reactor such as the FRM-II. The following issues raised by TUM were addressed in Ref. 1: qualification of HEU and LEU silicide fuels, gamma heating in the heavy water reflector, radiological consequences of larger fission product and plutonium inventories in the LEU core, and cost and schedule. The conclusions of these analyses are summarized below. This paper addresses three additional safety issues that were raised by TUM in Ref. 2: stability of the involute fuel plates, a hypothetical accident involving the configuration of the reflector, and a loss of primary coolant flow transient due to an interrupted power supply. Based on the excellent results for the Alternative LEU Design that were obtained in these analyses, the RERTR Program concludes that all of the major technical issues regarding use of LEU fuel instead of HEU fuel in the FRM-II have been successfully resolved and that it is definitely feasible to use LEU fuel in the FRM-II without compromising the safety or performance of the facility

  3. Comparison of the FRM-II HEU design with an alternative LEU design

    International Nuclear Information System (INIS)

    Mo, S.C.; Hanan, N.A.; Matos, J.E.

    2004-01-01

    The FRM-II reactor design of the Technical University of Munich has a compact core that utilizes fuel plates containing highly-enriched uranium (HEU, 93%). This paper presents an alternative core design utilizing low-enriched uranium (LEU, 3 that provides nearly the same neutron flux for experiments as the HEU design, but has a less favourable fuel cycle economy. If an LEU fuel with a uranium density of 6.0 - 6.5 g/cm 3 . were developed, the alternative design would provide the same neutron flux and use the same number of cores per year as the HEU design. The results of this study show that there are attractive possibilities for using LEU fuel instead of HEU fuel in the FRM-II. Further optimization of the LEU design and near-term availability of LEU fuel with a uranium density greater than 4.8 g/cm 3 would enhance the performance of the LEU core. The REKIR Program is ready to exchange information with the Technical University of Munich to resolve any differences that may exist and to identify design modifications that would optimize reactor performance utilizing LEU fuel. (author)

  4. Comparison of the FRM-II HEU design with an alternative LEU design. Attachment

    International Nuclear Information System (INIS)

    Hanan, N.A.; Mo, S.C.; Smith, R.S.; Matos, J.E.

    2004-01-01

    After presentation of the foregoing paper by Dr. Nelson Hanan of Argonne National Laboratory (ANL) proposing an alternative LEU core with one fuel ring and a power level of 33 MW, a presentation was made by Dr. Klaus Boning of the Technical University of Munich comparing the FRM-II HEU design with an LEU design by Tlm that had two fuel rings and a power level of 40 MW. Dr. Boning raised the following issues concerning the use of LEU fuel in FRM-H reactor designs: (1) qualification of HEU and LEU silicide fuels, (2) gamma heating in the heavy water reflector, (3) the radiological consequences of hypothetical accidents, and (4) cost and schedule. These issues are addressed in this Attachment. In his presentation, Dr. Hanan mentioned that ANL was also investigating other LEU designs. This work led to a second alternative LEU design that has the same neutron flux performance (8 x 10 14 n/cm 2 /s peak neutron flux in the reflector) and the same fuel lifetime (50 full power days) as the HEU design, but uses LEU silicide fuel with a uranium density of only 4.5 g/cm 3 . This design was achieved by using a fuel plate that has a fuel meat thickness of 0.76 mm, a cladding thickness of 0.38 mm, and a water channel gap of 2.2 mm. A comparison is shown of the main characteristics of this second alternative LEU design with those of the FRM-II HEU design. The ANL core again has one fuel ring with the same dimensions. With this LEU design, a two stage process is no longer necessary because LEU silicide fuel with a uranium density of 4.5 g/cm 3 is fully qualified, licensable, and available now for use in a high flux reactor such as the FRM-II

  5. RIP Input Tables from WAPDEG for LA Design Selection: Enhanced Design Alternative II-3

    International Nuclear Information System (INIS)

    A.M. Monib

    1999-01-01

    The purpose of this calculation is to document (1) the Waste Package Degradation (WAPDEG) version 3.09 (CRWMS M and O 1998b. ''Software Routine Report for WAPDEG'' (Version 3.09)) simulations used to analyze degradation and failure of 2-cm thick titanium grade 7 corrosion resistant material (CRM) drip shields (that are placed over waste packages composed of a 2-cm thick Alloy 22 corrosion resistant material (CRM) as the outer barrier and an unspecified material to provide structural support as the inner barrier) as well as degradation and failure of the waste packages themselves, and (2) post-processing of these results into tables of drip shield/waste package degradation time histories suitable for use as input into the Integrated Probabilistic Simulator for Environmental Systems (RIP) version 5.19.01 (Golder Associates 1998) computer code. This calculation supports Performance Assessment analysis of the License Application Design Selection (LADS) Enhanced Design Alternative (EDA) II-3. The aging period in the EDA II design (CRWMS M and O 1999f. ''Design Input Request for LADS Phase II EDA Evaluations'', Item 1 Row 9 Column 3) was replaced in the case of EDA II-3 with 25 years preclosure ventilation, leading to a total of 50 years preclosure ventilation. The waste packages are line loaded in the repository and no backfill is used

  6. Comment on the contribution of S.C. Mo, N.A. Hanan and J.E. Matos: 'Comparison of the FRM-II HEU design with an alternative LEU design'

    International Nuclear Information System (INIS)

    Boening, K.

    2004-01-01

    The results of the reference paper, which came to our attention for the first time during this RERTR Meeting, are more or less consistent with neutronic data we have obtained earlier within the FRM-II project (i.e. with own calculations and extrapolations). However, a realistic comparison of the HEU design of the FR.M-II (HEU = highly enriched uranium, 93 % U-235) with an alternative LEU design (LEU = low enriched uranium, 20 % U-235) is only possible on the basis of identical assumptions on the input parameters and has to consider more than neutronic data only. Serious scientists and experts should not confuse the politicians with academic studies touching some aspects of the full story only. The comparison has shown that the performance and reliability of the FRM-II design, which uses HEU fuel, is so advantageous that it can not - not even approximately - be met by an alternative design using LEU fuel. A change of the FRM-II design from HEU to LEU fuel with the results as shown above - i.e. less performance, higher costs, more nuclear waste and higher risk potential, and all of this with a delay of at least 5 years this could never be justified. If a future development of more advanced fuels should allow us to achieve our scientific goals at the conditions as identified above also with uranium of reduced enrichment - there would be no objection to a corresponding later conversion. Activities to realize a new neutron source in Germany go back to the late 70's with the project of a new middle flux beam reactor (MSR), which was abandoned shortly later in favour of an ambitious new spallation neutron source (SNQ). After this project also having been terminated around 1985 because of too high costs and technological risks, the hopes of the German community of neutron scientists focussed on the FRM-II. If non-technical pressure would damage this project this would equally provide irreversible damage to the large and still prospering field of neutron research in Germany

  7. Values-led Participatory Design as a pursuit of meaningful alternatives

    DEFF Research Database (Denmark)

    Leong, Tuck Wah; Iversen, Ole Sejer

    2015-01-01

    Participatory Design (PD) is inherently concerned with inquiring into and supporting human values when designing IT. We argue that a PD approach that is led by a focus upon participants' values can allow participants to discover meaningful alternatives -- alternative uses and alternative...... conceptualizations for IT that are particularly meaningful to them. However, how PD works with values in the design process has not been made explicit. In this paper, we aim to (i) explicate this values-led PD approach, (ii) illustrate how this approach can lead to outcomes that are meaningful alternatives, and (iii...

  8. RIP Input From WAPDEG for LA Design Selection: Enhanced Design Alternative II

    International Nuclear Information System (INIS)

    B.E. Bullard

    1999-01-01

    The purpose of this analysis is to identify and analyze concepts for the acquisition of data in support of the Performance Confirmation (PC) program at the potential subsurface nuclear waste repository at Yucca Mountain. This analysis is being prepared to document an investigation of design concepts, current available technology, technology trends, and technical issues associated with data acquisition during the PC period. This analysis utilizes the ''Performance Confirmation Plan'' (CRWMS M and O 2000b) to help define the scope for the PC data acquisition system. The focus of this analysis is primarily on the PC period for a minimum of 30 years after emplacement of the last waste package. The design of the data acquisition system shall allow for a closure deferral up to 300 years from initiation of waste emplacement. (CRWMS M and O 2000h, page 5-1). This analysis is a revision to and supercedes analysis, ''Performance Confirmation Data Acquisition System'', DI No. BCAI00000-017 17-0200-00002 Rev 00 (CRWMS M and O 1997), and incorporates the latest repository design changes following the M and O and DOE evaluation of a series of Enhanced Design Alternatives (EDAs), as described in the ''Enhanced Design Alternatives II Report'' (CRWMS M and O 1999d). Significant design changes include: thermal line loading of the emplacement drifts, closer spacing of the waste packages (WPs), wider spacing and fewer emplacement drifts, continuous ventilation of all active emplacement drifts, thinner walled WP designs which will increase external radiation levels, a 50-year repository closure option, inclusion of a drip-shield, exclusion of backfill, and new conceptual designs for the waste emplacement vehicles and equipment (Stroupe 2000). The scope and primary objectives of this analysis are to: (1) Review the criteria for design as presented in the Performance Confirmation Data Acquisition/Monitoring System Description Document, by way of the Input Transmittal, ''Performance

  9. Alternative pathways for angiotensin II generation in the cardiovascular system

    Directory of Open Access Journals (Sweden)

    C. Becari

    2011-09-01

    Full Text Available The classical renin-angiotensin system (RAS consists of enzymes and peptides that regulate blood pressure and electrolyte and fluid homeostasis. Angiotensin II (Ang II is one of the most important and extensively studied components of the RAS. The beneficial effects of angiotensin converting enzyme (ACE inhibitors in the treatment of hypertension and heart failure, among other diseases, are well known. However, it has been reported that patients chronically treated with effective doses of these inhibitors do not show suppression of Ang II formation, suggesting the involvement of pathways alternative to ACE in the generation of Ang II. Moreover, the finding that the concentration of Ang II is preserved in the kidney, heart and lungs of mice with an ACE deletion indicates the important role of alternative pathways under basal conditions to maintain the levels of Ang II. Our group has characterized the serine protease elastase-2 as an alternative pathway for Ang II generation from Ang I in rats. A role for elastase-2 in the cardiovascular system was suggested by studies performed in heart and conductance and resistance vessels of normotensive and spontaneously hypertensive rats. This mini-review will highlight the pharmacological aspects of the RAS, emphasizing the role of elastase-2, an alternative pathway for Ang II generation.

  10. RIP INPUT TABLES FROM WAPDEG FOR LA DESIGN SELECTION: ENHANCED DESIGN ALTERNATIVE V

    International Nuclear Information System (INIS)

    K. Mon

    1999-01-01

    The purpose of this calculation is to document (1) the Waste Package Degradation (WAPDEG) version 3.09 (CRWMS M and O 1998b, Software Routine Report for WAPDEG (Version 3.09)) simulations used to analyze degradation and failure of 2-cm thick titanium grade 7 corrosion resistant material (CRM) drip shields (that are placed over waste packages composed of a 2-cm thick Alloy 22 corrosion resistant material (CRM) as the outer barrier and an unspecified material to provide structural support as the inner barrier) as well as degradation and failure of the waste packages themselves, and (2) post-processing of these results into tables of drip shield/waste package degradation time histories suitable for use as input into the Integrated Probabilistic Simulator for Environmental Systems (RIP) version 5.19.01 (Golder Associates 1998) computer code. Performance credit of the inner barrier material is not taken in this calculation. This calculation supports Performance Assessment analysis of the License Application Design Selection (LADS) Enhanced Design Alternative V. Additional details concerning the Enhanced Design Alternative V are provided in a Design Input Request (CRWMS M and O 1999e, Design Input Request for LADS Phase II EDA Evaluations, Item 3)

  11. EBR-II Primary Tank Wash-Water Alternatives Evaluation

    International Nuclear Information System (INIS)

    Demmer, R.; Heintzelman, J.; Squires, L.; Meservey, R.

    2009-01-01

    The EBR-II reactor at Idaho National Laboratory was a liquid sodium metal cooled reactor that operated for 30 years. Approximately 1100 kg of residual sodium remained in the primary system after draining the bulk sodium. To stabilize the remaining sodium, both the primary and secondary systems were treated with a purge of moist carbon dioxide. The passivation treatment was stopped in 2005 and the primary system is maintained under a blanket of dry carbon dioxide. Approximately 670 kg of sodium metal remains in the primary system in locations that were inaccessible to passivation treatment or in pools of sodium that were too deep for complete penetration of the passivation treatment. The EBR-II reactor was permitted by the Idaho Department of Environmental Quality (DEQ) in 2002 under a RCRA permit that requires removal of all remaining sodium. The proposed baseline closure method would remove the large components from the primary tank, fill the primary system with water, react the remaining sodium with the water and dissolve the reaction products in about 100,000 gallons of wash water. On February 19-20, 2008, a workshop was held in Idaho Falls, Idaho, to evaluate alternatives that could meet the RCRA permit clean closure requirements and minimize the quantity of hazardous waste generated by the cleanup process. The workshop convened a panel of national and international sodium cleanup specialists, subject matter experts from the INL, and the EBR-II Wash Water Project team that organized the workshop. The workshop was conducted by a trained facilitator using Value Engineering techniques to elicit the most technically sound solutions from the workshop participants. A brainstorming session was held to identify possible alternative treatment methods that would meet the primary functions and criteria of neutralizing the hazards, maximizing byproduct removal and minimizing waste generation. An initial list of some 20 probable alternatives was evaluated and refined down

  12. Enhanced Design Alternative IV

    International Nuclear Information System (INIS)

    Kramer, N.E.

    1999-01-01

    This report evaluates Enhanced Design Alternative (EDA) IV as part of the second phase of the License Application Design Selection (LADS) effort. The EDA IV concept was compared to the VA reference design using criteria from the Design Input Request for LADS Phase II EDA Evaluations (CRWMS M and O 1999b) and (CRWMS M and O 1999f). Briefly, the EDA IV concept arranges the waste packages close together in an emplacement configuration known as line load. Continuous pre-closure ventilation keeps the waste packages from exceeding their 350 C cladding and 200 C (4.3.6) drift wall temperature limits. This EDA concept keeps relatively high, uniform emplacement drift temperatures (post-closure) to drive water away from the repository and thus dry out the pillars between emplacement drifts. The waste package is shielded to permit human access to emplacement drifts and includes an integral filler inside the package to reduce the amount of water that can contact the waste form. Closure of the repository is desired 50 years after first waste is emplaced. Both backfill and drip shields will be emplaced at closure to improve post-closure performance. The EDA IV concept includes more defense-in-depth layers than the VA reference design because of its backfill, drip shield, waste package shielding, and integral filler features. These features contribute to the low dose-rate to the public achieved during the first 10,000 years of repository life as shown in Figure 3. Investigation of the EDA IV concept has led to the following general conclusions: (1) The total life cycle cost for EDA IV is about $21.7 billion which equates to a $11.3 billion net present value (both figures rounded up). (2) The incidence of design basis events for EDA IV is similar to the VA reference design. (3) The emplacement of the waste packages in drifts will be similar to the VA reference design. However, heavier equipment may be required because the shielded waste package will be heavier. (4) The heavier

  13. Total System Performance Assessment: Enhanced Design Alternative V

    International Nuclear Information System (INIS)

    N. Erb; S. Miller; V. Vallikat

    1999-01-01

    This calculation documents the total system performance assessment modeling of Enhanced Design Analysis (EDA) V. EDA V is based on the TSPA-VA base design which has been modified with higher thermal loading, a quartz sand invert, and line loading with 21 PWR waste packages that have 2-cm thick titanium grade 7 corrosion resistance material (CRM) drip shields placed over dual-layer waste packages composed of 'inside out' VA reference material (CRWMS M and O 1999a). This document details the changes and assumptions made to the VA reference Performance Assessment Model (CRWMS M and O 1998a) to incorporate the design changes detailed for EDA V. The performance measure for this evaluation is expected value dose-rate history. Time histories of dose rate are presented for EDA V and a Defense in Depth (DID) analysis base on EDA V. Additional details concerning the Enhanced Design Alternative II are provided in the 'LADS 3-12 Requests' interoffice correspondence (CRWMS M and O 1999a)

  14. NSLS-II Preliminary Design Report

    International Nuclear Information System (INIS)

    Dierker, S.

    2007-01-01

    Following the CD0 approval of the National Synchrotron Light Source II (NSLS-II) during August 2005, Brookhaven National Laboratory prepared a conceptual design for a worldclass user facility for scientific research using synchrotron radiation. DOE SC review of the preliminary baseline in December 2006 led to the subsequent CD1 approval (approval of alternative selection and cost range). This report is the documentation of the preliminary design work for the NSLS-II facility. The preliminary design of the Accelerator Systems (Part 1) was developed mostly based of the Conceptual Design Report, except for the Booster design, which was changed from in-storage-ring tunnel configuration to in external- tunnel configuration. The design of beamlines (Part 2) is based on designs developed by engineering firms in accordance with the specification provided by the Project. The conventional facility design (Part 3) is the Title 1 preliminary design by the AE firm that met the NSLS-II requirements. Last and very important, Part 4 documents the ES and H design and considerations related to this preliminary design. The NSLS-II performance goals are motivated by the recognition that major advances in many important technology problems will require scientific breakthroughs in developing new materials with advanced properties. Achieving this will require the development of new tools that will enable the characterization of the atomic and electronic structure, chemical composition, and magnetic properties of materials, at nanoscale resolution. These tools must be nondestructive, to image and characterize buried structures and interfaces, and they must operate in a wide range of temperatures and harsh environments. The NSLS-II facility will provide ultra high brightness and flux and exceptional beam stability. It will also provide advanced insertion devices, optics, detectors, and robotics, and a suite of scientific instruments designed to maximize the scientific output of the

  15. NSLS-II Preliminary Design Report

    Energy Technology Data Exchange (ETDEWEB)

    Dierker, S.

    2007-11-01

    Following the CD0 approval of the National Synchrotron Light Source II (NSLS-II) during August 2005, Brookhaven National Laboratory prepared a conceptual design for a worldclass user facility for scientific research using synchrotron radiation. DOE SC review of the preliminary baseline in December 2006 led to the subsequent CD1 approval (approval of alternative selection and cost range). This report is the documentation of the preliminary design work for the NSLS-II facility. The preliminary design of the Accelerator Systems (Part 1) was developed mostly based of the Conceptual Design Report, except for the Booster design, which was changed from in-storage-ring tunnel configuration to in external- tunnel configuration. The design of beamlines (Part 2) is based on designs developed by engineering firms in accordance with the specification provided by the Project. The conventional facility design (Part 3) is the Title 1 preliminary design by the AE firm that met the NSLS-II requirements. Last and very important, Part 4 documents the ES&H design and considerations related to this preliminary design. The NSLS-II performance goals are motivated by the recognition that major advances in many important technology problems will require scientific breakthroughs in developing new materials with advanced properties. Achieving this will require the development of new tools that will enable the characterization of the atomic and electronic structure, chemical composition, and magnetic properties of materials, at nanoscale resolution. These tools must be nondestructive, to image and characterize buried structures and interfaces, and they must operate in a wide range of temperatures and harsh environments. The NSLS-II facility will provide ultra high brightness and flux and exceptional beam stability. It will also provide advanced insertion devices, optics, detectors, and robotics, and a suite of scientific instruments designed to maximize the scientific output of the facility

  16. Overview of the TITAN-II reversed-field pinch aqueous fusion power core design

    Energy Technology Data Exchange (ETDEWEB)

    Wong, C.P.C.; Creedon, R.L.; Grotz, S.; Cheng, E.T.; Sharafat, S.; Cooke, P.I.H.

    1988-03-01

    TITAN-II is a compact, high power density Reversed-Field Pinch fusion power reactor design based on the aqueous lithium solution fusion power core concept. The selected breeding and structural materials are LiNO/sub 3/ and 9-C low activation ferritic steel, respectively. TITAN-II is a viable alternative to the TITAN-I lithium self-cooled design for the Reversed-Field Pinch reactor to operate at a neutron wall loading of 18 MWm/sup 2/. Submerging the complete fusion power core and the primary loop in a large pool of cool water will minimize the probability of radioactivity release. Since the protection of the large pool integrity is the only requirement for the protection of the public, TITAN-II is a passive safety assurance design. 13 refs., 3 figs., 1 tab.

  17. Overview of the TITAN-II reversed-field pinch aqueous fusion power core design

    Energy Technology Data Exchange (ETDEWEB)

    Wong, C.P.C.; Creedon, R.L.; Cheng, E.T. (General Atomic Co., San Diego, CA (USA)); Grotz, S.P.; Sharafat, S.; Cooke, P.I.H. (California Univ., Los Angeles (USA). Dept. of Mechanical, Aerospace and Nuclear Engineering; California Univ., Los Angeles, CA (USA). Inst. for Plasma and Fusion Research); TITAN Research Group

    1989-04-01

    TITAN-II is a compact, high-power-density Reversed-Field Pinch fusion power reactor design based on the aqueous lithium solution fusion power core concept. The selected breeding and structural materials are LiNO/sub 3/ and 9-C low activation ferritic steel, respectively. TITAN-II is a viable alternative to the TITAN-I lithium self-cooled design for the Reversed-Field Pinch reactor to operate at a neutron wall loading of 18 MW/m/sup 2/. Submerging the complete fusion power core and the primary loop in a large pool of cool water will minimize the probability of radioactivity release. Since the protection of the large pool integrity is the only requirement for the protection of the public, TITAN-II is a level 2 of passive safety assurance design. (orig.).

  18. Fluxes at experiment facilities in HEU and LEU designs for the FRM-II

    International Nuclear Information System (INIS)

    Hanan, N. A.

    1998-01-01

    An Alternative LEU Design for the FRM-II proposed by the RERTR Program at Argonne National Laboratory (ANL) has a compact core consisting of a single fuel element that uses LEU silicide fuel with a uranium density of 4.5 g/cm 3 and has a power level of 32 MW. Both the HEU design by the Technical University of Munich (TUM) and the alternative LEU design by ANL have the same fuel lifetime(50 days) and the same neutron flux performance (8 x 10 14 n/cm 2 -s in the reflector). LEU silicide fuel with 4.5 g/cm 3 has been thoroughly tested and is fully-qualified, licensable, and available now for use in a high flux reactor such as the FRM-II. Several issues that were raised by TUM have been addressed in Refs. 1-3. The conclusions of these analyses are summarized below. This paper addresses four additional issues that have been raised in several forums, including Ref 4: heat generation in the cold neutron source (CNS), the gamma and fast neutron fluxes which are components of the reactor noise in neutron scattering experiments in the experiment hall of the reactor, a fuel cycle length difference, and the reactivity worth of the beam tubes and other experiment facilities. The results show that: (a) for the same thermal neutron flux, the neutron and gamma heating in the CNS is smaller in the LEU design than in the HEU design, and cold neutron fluxes as good or better than those of the HEU design can be obtained with the LEU design; (b) the gamma and fast neutron components of the reactor noise in the experiment hall are about the same in both designs; (c) the fuel cycle length is 50 days for both designs; and (d) the absolute value of the reactivity worth of the beam tubes and other experiment facilities is smaller in the LEU design, allowing its fuel cycle length to be increased to 53 or 54 days. Based on the excellent results for the Alternative LEU Design that were obtained in all analyses, the RERTR Program reiterates its conclusion that there are no major technical

  19. Lawrence Livermore National Laboratory Decontamination and Waste Treatment Facility: Documentation of impact analysis for design alternatives presented in the Draft Environmental Impact Statement

    International Nuclear Information System (INIS)

    1988-05-01

    Lawrence Livermore National Laboratory (LLNL) is proposing to construct and operate a new Decontamination and Waste Treatment Facility (DWTF). The proposed DWTF would replace the existing Hazardous Waste Management (HWM) facilities at LLNL. The US Department of Energy (DOE) is preparing a Draft Environmental Impact Statement (DEIS) to assess the environmental consequences of the proposed DWTF and its alternatives. This report presents the assumptions, methodologies, and analyses used to estimate the waste flows, air emissions, ambient air quality impacts, and public health risks that are presented in the DEIS. Two DWTF design alternatives (Level I and Level II) have been designated as reasonable design alternatives considering available technologies, environmental regulations, and current and future LLNL waste generation. Both design alternatives would include new, separate radioactive and nonradioactive liquid waste treatment systems, a solidification unit, a new decontamination facility, storage and treatment facilities for reactive materials, a radioactive waste storage area, receiving and classification areas, and a uranium burn pan. The Level I design alternative would include a controlled-air incinerator system, while the Level II design alternative would include a rotary kiln incinerator system. 43 refs., 4 figs., 24 tabs

  20. Enhanced Design Alternative I: Low Temperature Design

    International Nuclear Information System (INIS)

    MacNeil, K.

    1999-01-01

    The purpose of this document is to evaluate Enhanced Design Alternative (EDA) 1, the low temperature repository design concept (CRWMS M and O 1999a). This technical document will provide supporting information for Site Recommendation (SR) and License Application (LA). Preparation of this evaluation will be in accordance with the technical document preparation plan (TDPP), (CRWMS M and O 1999b). EDA 1, one of five EDAs, was evolved from evaluation of a series of design features and alternatives developed during the first phase of the License Application Design Selection (LADS) process. Low, medium, and high temperature concepts were developed from the design features and alternatives prepared during Phase 1 of the LADS effort (CRWMS M and O 1999a). EDA 1 will first be evaluated against a single Screening Criterion, outlined in CRWMS M and O 1999a, which addresses post-closure performance of the repository. The performance of the repository is defined quantitatively as the peak radiological dose rate to an average individual of a critical group at a distance of 20 km from the repository site within 10,000 years. To satisfy this criterion the peak dose rate must not exceed the anticipated regulatory level of 25 mrem/yr within 10,000 years. If the EDA meets the screening criterion, the EDA will be further evaluated against the LADS Phase 2 Evaluation Criteria contained in CRWMS M and O 1999a

  1. Facilities design for TIBER II

    International Nuclear Information System (INIS)

    Thomson, S.L.; Blevins, J.D.

    1987-01-01

    This paper describes the conceptual design of the reactor building and reactor maintenance building for the TIBER II tokamak. These buildings are strongly influenced by the reactor configuration, and their characterization allows a better understanding of the economic and technical implications of the reactor design. Key features of TIBER II that affect the facilities design are the small size and compact arrangement, the use of an external vacuum vessel, and the complete reliance on remote maintenance. The building design incorporates requirements for equipment layout, maintenance operations and equipment, safety, and contamination control. 4 figs

  2. Design of a high-power test model of the PEP-II rf cavity

    International Nuclear Information System (INIS)

    Schwarz, H.D.; Bell, R.A.; Hodgson, J.A.

    1993-05-01

    The design of a normal-conducting high-power test cavity (HPTC) for PEP-II is described. The cavity includes HOM loading waveguides and provisions for testing two alternate input coupling schemes. 3-D electromagnetic field simulations provided input information for the surface power deposition. Finite element codes were utilized for thermal and stress analyses of the cavity to arrive at a suitable mechanical design capable of handling the high power dissipation. The mechanical design approach with emphasis on the cooling channel layout and mechanical stress reduction is described

  3. Seal design alternatives study

    International Nuclear Information System (INIS)

    Van Sambeek, L.L.; Luo, D.D.; Lin, M.S.; Ostrowski, W.; Oyenuga, D.

    1993-06-01

    This report presents the results from a study of various sealing alternatives for the WIPP sealing system. Overall, the sealing system has the purpose of reducing to the extent possible the potential for fluids (either gas or liquid) from entering or leaving the repository. The sealing system is divided into three subsystems: drift and panel seals within the repository horizon, shaft seals in each of the four shafts, and borehole seals. Alternatives to the baseline configuration for the WIPP seal system design included evaluating different geometries and schedules for seal component installations and the use of different materials for seal components. Order-of-magnitude costs for the various alternatives were prepared as part of the study. Firm recommendations are not presented, but the advantages and disadvantages of the alternatives are discussed. Technical information deficiencies are identified and studies are outlined which can provide required information

  4. Alternative Natural Energy Sources in Building Design.

    Science.gov (United States)

    Davis, Albert J.; Schubert, Robert P.

    This publication provides a discussion of various energy conserving building systems and design alternatives. The information presented here covers alternative space and water heating systems, and energy conserving building designs incorporating these systems and other energy conserving techniques. Besides water, wind, solar, and bio conversion…

  5. Design of Phase II Non-inferiority Trials.

    Science.gov (United States)

    Jung, Sin-Ho

    2017-09-01

    With the development of inexpensive treatment regimens and less invasive surgical procedures, we are confronted with non-inferiority study objectives. A non-inferiority phase III trial requires a roughly four times larger sample size than that of a similar standard superiority trial. Because of the large required sample size, we often face feasibility issues to open a non-inferiority trial. Furthermore, due to lack of phase II non-inferiority trial design methods, we do not have an opportunity to investigate the efficacy of the experimental therapy through a phase II trial. As a result, we often fail to open a non-inferiority phase III trial and a large number of non-inferiority clinical questions still remain unanswered. In this paper, we want to develop some designs for non-inferiority randomized phase II trials with feasible sample sizes. At first, we review a design method for non-inferiority phase III trials. Subsequently, we propose three different designs for non-inferiority phase II trials that can be used under different settings. Each method is demonstrated with examples. Each of the proposed design methods is shown to require a reasonable sample size for non-inferiority phase II trials. The three different non-inferiority phase II trial designs are used under different settings, but require similar sample sizes that are typical for phase II trials.

  6. 40 CFR 60.4111 - Alternate Hg designated representative.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false Alternate Hg designated representative... Times for Coal-Fired Electric Steam Generating Units Hg Designated Representative for Hg Budget Sources § 60.4111 Alternate Hg designated representative. (a) A certificate of representation under § 60.4113...

  7. Preliminary PBFA II design

    International Nuclear Information System (INIS)

    Johnson, D.L.; VanDevender, J.P.; Martin, T.H.

    1980-01-01

    The upgrade of Sandia National Laboratories particle beam fusion accelerator, PBFA I, to PBFA II presents several interesting and challenging pulsed power design problems. PBFA II requires increasing the PBFA I output parameters from 2 MV, 30 TW, 1 MJ to 4 MV, 100 TW, 3.5 MJ with the constraint of using much of the same PBFA I hardware. The increased PBFA II output will be obtained by doubling the number of modules (from 36 to 72), increasing the primary energy storage (from 4 MJ to 15 MJ), lowering the pulse forming line (PFL) output impedance, and adding a voltage doubling network

  8. Early Site Permit Demonstration Program: Station design alternatives report

    International Nuclear Information System (INIS)

    1993-03-01

    This report provides the results of investigating the basis for including Station Design Alternatives (SDAs) in the regulatory guidance given for nuclear plant environmental reports (ERs), explains approaches or processes for evaluating SDAs at the early site permit (ESP) stage, and applies one of the processes to each of the ten systems or subsystems considered as SDAS. The key objective o this report s to demonstrate an adequate examination of alternatives can be performed without the extensive development f design data. The report discusses the Composite Suitability Approach and the Established Cutoff Approach in evaluating station design alternatives and selects one of these approaches to evaluate alternatives for each of the plant or station that were considered. Four types of ALWRs have been considered due to the availability of extensive plant data: System 80+, AP600, Advanced Boiling Reactor (ABWR), and Simplified Boiling Water Reactor (SBWR). This report demonstrates the feasibility of evaluating station design alternatives when reactor design detail has not been determined, quantitatively compares the potential ental impacts of alternatives, and focuses the ultimate selection of a alternative on cost and applicant-specific factors. The range of alternatives system is deliberately limited to a reasonable number to demonstrate the or to the three most commonly used at operating plants

  9. Rational solutions of the discrete time Toda lattice and the alternate discrete Painleve II equation

    International Nuclear Information System (INIS)

    Common, Alan K; Hone, Andrew N W

    2008-01-01

    The Yablonskii-Vorob'ev polynomials y n (t), which are defined by a second-order bilinear differential-difference equation, provide rational solutions of the Toda lattice. They are also polynomial tau-functions for the rational solutions of the second Painleve equation (P II ). Here we define two-variable polynomials Y n (t, h) on a lattice with spacing h, by considering rational solutions of the discrete time Toda lattice as introduced by Suris. These polynomials are shown to have many properties that are analogous to those of the Yablonskii-Vorob'ev polynomials, to which they reduce when h = 0. They also provide rational solutions for a particular discretization of P II , namely the so-called alternate discrete P II , and this connection leads to an expression in terms of the Umemura polynomials for the third Painleve equation (P III ). It is shown that the Baecklund transformation for the alternate discrete Painleve equation is a symplectic map, and the shift in time is also symplectic. Finally we present a Lax pair for the alternate discrete P II , which recovers Jimbo and Miwa's Lax pair for P II in the continuum limit h → 0

  10. Design alternatives report for the cesium removal demonstration

    Energy Technology Data Exchange (ETDEWEB)

    Walker, J.F. Jr.; Youngblood, E.L.

    1995-09-01

    The Cesium Removal Demonstration (CRD) project will use liquid low-level waste (LLLW) stored in the Oak Ridge National Laboratory Melton Valley Storage Tanks to demonstrate cesium removal from sodium nitrate-based supernates. This report presents the results of a conceptual design study to scope the alternatives for conducting the demonstration at ORNL. Factors considered included (1) sorbent alternatives, (2) facility alternatives, (3) process alternatives, (4) process disposal alternatives, and (5) relative cost comparisons. Recommendations included (1) that design of the CRD system move forward based on information obtained to date from tests with Savannah River Resin, (2) that the CRD system be designed so it could use crystalline silicotitanates (CST) if an engineered form of CST becomes available prior to the CRD, (3) that the system be designed without the capability for resin regeneration, (4) that the LLLW solidification facility be used for the demonstration (5) that vitrification of the loaded resins from the CRD be demonstrated at the Savannah River Site, and (6) that permanent disposal of the loaded and/or vitrified resin at the Nevada Test Site be pursued.

  11. Design alternatives report for the cesium removal demonstration

    International Nuclear Information System (INIS)

    Walker, J.F. Jr.; Youngblood, E.L.

    1995-09-01

    The Cesium Removal Demonstration (CRD) project will use liquid low-level waste (LLLW) stored in the Oak Ridge National Laboratory Melton Valley Storage Tanks to demonstrate cesium removal from sodium nitrate-based supernates. This report presents the results of a conceptual design study to scope the alternatives for conducting the demonstration at ORNL. Factors considered included (1) sorbent alternatives, (2) facility alternatives, (3) process alternatives, (4) process disposal alternatives, and (5) relative cost comparisons. Recommendations included (1) that design of the CRD system move forward based on information obtained to date from tests with Savannah River Resin, (2) that the CRD system be designed so it could use crystalline silicotitanates (CST) if an engineered form of CST becomes available prior to the CRD, (3) that the system be designed without the capability for resin regeneration, (4) that the LLLW solidification facility be used for the demonstration (5) that vitrification of the loaded resins from the CRD be demonstrated at the Savannah River Site, and (6) that permanent disposal of the loaded and/or vitrified resin at the Nevada Test Site be pursued

  12. The physics design of EBR-II

    International Nuclear Information System (INIS)

    Loewenstein, W.B.

    1962-01-01

    The physics design oi EBR-II. Calculations of the static, dynamic and long-term reactivity behaviour of EBR-II are reported together with results and analysis of EBR-II dry critical and ZPR-III mock-up experiments. Particular emphasis is given to reactor-physics design problems which arise after the conceptual design is established and before the reactor is built or placed into operation. Reactor-safety analyses and hazards-evaluation considerations are described with their influence on the reactor design. The manner of utilizing the EBR-II mock-up on ZPR-III data and the EBR-II dry critical data is described. These experiments, their analysis and theoretical predictions are the basis for predetermining the physics behaviour of the reactor system. The limitations inherent in applying the experimental data to the performance of the power-reactor system are explored in some detail. This includes the specification of reactor core size and/or fuel-alloy enrichment, provisions for adequate operating and shut-down reactivity, determination of operative temperature and power coefficients of reactivity, and details of power- and flux-distribution as a function of position within the reactor structure. The overall problem of transferring information from simple idealized analytical or experimental geometry to actual hexagonal reactor geometry is described. Nuclear performance, including breeding, of the actual reactor system is compared with that of the idealized conceptual system. The long-term reactivity and power behaviour of the reactor blanket is described within the framework of the proposed cycling of the fuel and blanket alloy. Safety considerations, including normal and abnormal rates of reactivity-insertion, the implication of postulated reactivity effects based on the physical behaviour of the fuel alloy and reactor structure as well as extrapolation of TREAT experiments to the EBR-II system are analysed. The EBR-II core melt-down problem is reviewed. (author

  13. Mechanical Engineering and Design of the LHC Phase II Collimators

    CERN Document Server

    Bertarelli, A; Gentini, L; Mariani, N; Perret, R; Timmins, M A

    2010-01-01

    Phase II collimators will complement the existing system to improve the expected high RF impedance and limited efficiency of Phase I jaws. An international collaborative effort has been launched to identify novel advanced materials responding to the very challenging requirements of the new collimators. Complex numerical calculations simulating extreme conditions and experimental tests are in progress. In parallel, an innovative modular design concept of the jaw assembly is being developed to allow fitting in alternative materials, minimizing the thermally induced deformations, withstanding accidents and accepting high radiation doses. Phase II jaw assembly is made up of a molybdenum back-stiffener ensuring high geometrical stability and a modular jaw split in threes sectors. Each sector is equipped with a high-efficiency independent cooling circuit. Beam position monitors (BPM) are embedded in the jaws to fasten setup time and improve beam monitoring. An adjustment system will permit to fine-tune the jaw flat...

  14. State alternative route designations

    International Nuclear Information System (INIS)

    1989-07-01

    Pursuant to the Hazardous Materials Transportation Act (HMTA), the Department of Transportation (DOT) has promulgated a comprehensive set of regulations regarding the highway transportation of high-level radioactive materials. These regulations, under HM-164 and HM-164A, establish interstate highways as the preferred routes for the transportation of radioactive materials within and through the states. The regulations also provide a methodology by which a state may select alternative routes. First,the state must establish a ''state routing agency,'' defined as an entity authorized to use the state legal process to impose routing requirements on carriers of radioactive material (49 CFR 171.8). Once identified, the state routing agency must select routes in accordance with Large Quantity Shipments of Radioactive Materials or an equivalent routing analysis. Adjoining states and localities should be consulted on the impact of proposed alternative routes as a prerequisite of final route selection. Lastly, the states must provide written notice of DOT of any alternative route designation before the routes are deemed effective

  15. Evaluating design alternatives using conjoint experiments in virual reality

    NARCIS (Netherlands)

    Dijkstra, J.; Leeuwen, van J.P.; Timmermans, H.J.P.

    2003-01-01

    In this paper the authors describe the design of an experiment based on conjoint measurement that explores the possibility of using the Internet to evaluate design alternatives. These design alternatives are presented as panoramic views, and preferences are measured by asking subjects which

  16. Safety and environmental requirements and design targets for TIBER-II

    International Nuclear Information System (INIS)

    Piet, S.J.

    1987-09-01

    A consistent set of safety and environmental requirements and design targets was proposed and adopted for the TIBER-II (Tokamak Ignition/Burn Experimental Reactor) design effort. TIBER-II is the most recent US version of a fusion experimental test reactor (ETR). These safety and environmental design targets were one contribution of the Fusion Safety Program in the TIBER-II design effort. The other contribution, safety analyses, is documented in the TIBER-II design report. The TIBER-II approach, described here, concentrated on logical development of, first, a complete and consistent set of safety and environmental requirements that are likely appropriate for an ETR, and, second, an initial set of design targets to guide TIBER-II. Because of limited time in the TIBER-II design effort, the iterative process only included one iteration - one set of targets and one design. Future ETR design efforts should therefore build on these design targets and the associated safety analyses. 29 refs., 5 figs., 3 tabs

  17. PBFA II energy storage section design

    International Nuclear Information System (INIS)

    Wilson, J.M.

    1983-01-01

    PBFA II will be the second thirty-six module accelerator built at Sandia National Laboratories for particle beam fusion feasibility studies. Each module of the machine will deliver 2.8 terawatts to a central experimental chamber. The total power delivered (100 terawatts) is expected to permit ignition scaling studies beginning in 1986. The PBFA II energy storage system consists of thirty-six 6.0 mv, 400 kj. Marx generators with their high voltage trigger and charging systems, and electromechanical output switching system. The paper describes the current design of this section of the machine. Constraints imposed by the existing tank and building are presented, as they relate to locating support systems in the oil section of PBFA II. The charging system and output switches have been designed and are described. A conceptual design for the Marx triggering system is also presented. Additional hardware (monitors, grounding connections, etc.) is discussed briefly with design details given where available

  18. Digital logic circuit design with ALTERA MAX+PLUS II

    International Nuclear Information System (INIS)

    Lee, Seung Ho; Park, Yong Su; Lee, Ju Heon

    2006-03-01

    Contents of this book are the kinds of integrated circuit, design process of integrated circuit, introduction of ALTERA MAX+PLUS II, designing logic circuit with VHDL of ALTERA MAX+PLUS II, grammar and practice of VHDL of ALTERA MAX+PLUS II, design for adder, subtractor, parallel binary subtractor, BCD design, CLA design, code converter design, ALU design, register design, counter design, accumulator design, state machine design, frequency divider design, circuit design with TENMILLION counter, LCD module, circuit design for control the outside RAM in training kit and introduction for HEB-DTK-20K-240/HBE-DTK-IOK.

  19. Alternative cover design

    International Nuclear Information System (INIS)

    1988-11-01

    The special study on Alternative Cover Designs is one of several studies initiated by the US Department of Energy (DOE) in response to the proposed US Environmental Protection Agency (EPA) groundwater standards. The objective of this study is to investigate the possibility of minimizing the infiltration of precipitation through stabilized tailings piles by altering the standard design of covers currently used on the Uranium Mill Tailings Remedial Action (UMTRA) Project. Prior. to the issuance of the proposed standards, UMTRA Project piles had common design elements to meet the required criteria, the most important of which were for radon diffusion, long-term stability, erosion protection, and groundwater protection. The standard pile covers consisted of three distinct layers. From top to bottom they were: rock for erosion protection; a sand bedding layer; and the radon barrier, usually consisting of a clayey sand material, which also functioned to limit infiltration into the tailings. The piles generally had topslopes from 2 to 4 percent and sideslopes of 20 percent

  20. Design Alternative Evaluation No. 3: Post-Closure Ventilation

    International Nuclear Information System (INIS)

    Logan, R.C.

    1999-01-01

    The objective of this study is to provide input to the Enhanced Design Alternatives (EDA) for License Application Design Selection (LADS). Its purpose is to develop and evaluate conceptual designs for post-closure ventilation alternatives that enhance repository performance. Post-closure ventilation is expected to enhance repository performance by limiting the amount of water contacting the waste packages. Limiting the amount of water contacting the waste packages will reduce corrosion

  1. 31 CFR 0.104 - Designated Agency Ethics Official and Alternate Designated Agency Ethics Official.

    Science.gov (United States)

    2010-07-01

    ... 31 Money and Finance: Treasury 1 2010-07-01 2010-07-01 false Designated Agency Ethics Official and Alternate Designated Agency Ethics Official. 0.104 Section 0.104 Money and Finance: Treasury Office of the... Responsibilities § 0.104 Designated Agency Ethics Official and Alternate Designated Agency Ethics Official. The...

  2. Enhanced Access Design Alternative I Study

    International Nuclear Information System (INIS)

    Eble, G.B.

    1999-01-01

    The purpose of this document is to evaluate Enhanced Design Alternative (EDA) 1, the low temperature repository design concept (CRWMS M and O 1999a). This technical document will provide supporting information for Site Recommendation (SR) and License Application (LA). Preparation of this evaluation will be in accordance with the technical document preparation plan (TDPP), (CRWMS M and O 1999b). EDA 1, one of five EDAs, was evolved from evaluation of a series of design features and alternatives developed during the first phase of the License Application Design Selection (LADS) process. Low, medium, and high temperature concepts were developed from the design features and alternatives prepared during Phase 1 of the LADS effort (CRWMS M and O 1999a). EDA 1 will first be evaluated against a single Screening Criterion, outlined in CRWMS M and O 1999a, which addresses post-closure performance of the repository. The performance of the repository is defined quantitatively as the peak radiological dose rate to an average individual of a critical group at a distance of 20 km from the repository site within 10,000 years. To satisfy this criterion the peak dose rate must not exceed the anticipated regulatory level of 25 mrem/yr within 10,000 years. If the EDA meets the screening criterion, the EDA will be further evaluated against the LADS Phase 2 Evaluation Criteria contained in CRWMS M and O 1999a

  3. 29 CFR 2703.2 - Designated agency ethics official and alternate designated agency ethics official.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 9 2010-07-01 2010-07-01 false Designated agency ethics official and alternate designated agency ethics official. 2703.2 Section 2703.2 Labor Regulations Relating to Labor (Continued) FEDERAL... agency ethics official and alternate designated agency ethics official. The Chairman shall appoint an...

  4. The PIP-II Reference Design Report

    Energy Technology Data Exchange (ETDEWEB)

    Lebedev, Valeri, [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); et al.

    2015-06-01

    The Proton Improvement Plan-II (PIP-II) is a high-intensity proton facility being developed to support a world-leading neutrino program over the next two decades at Fermilab. PIP-II is an integral part of the U.S. Intensity Frontier Roadmap as described in the Particle Physics Project Prioritization Panel (P5) report of May 2014 [1]. As an immediate goal PIP-II is focused on upgrades to the Fermilab accelerator complex capable of providing a beam power in excess of 1 MW on target at the initiation of LBNF [1,2] operations. PIP-II is a part of a longer-term concept for a sustained campaign of upgrades and improvements to achieve multi-MW capabilities at Fermilab. PIP-II is based on three major thrusts. They are (1) the recently completed upgrades to the Recycler and Main Injector (MI) for the NOvA experiment, (2) the Proton Improvement Plan [3] currently underway, and (3) the Project X Reference Design [4]. Note that: The Proton Improvement Plan (PIP) consolidates a set of improvements to the existing Linac, Booster, and Main Injector (MI) aimed at supporting 15 Hz Booster beam operation. In combination, the NOvA upgrades and PIP create a capability of delivering 700 kW beam power from the Main Injector at 120 GeV; The scope of the Project X Reference Design Report was aimed well beyond PIP. It described a complete concept for a multi-MW proton facility that could support a broad particle physics program based on neutrino, kaon, muon, and nucleon experiments [5,6]. The Project X conceptual design has evolved over a number of years, incorporating continuous input on physics research goals and advances in the underlying technology development programs [7,8,9]. PIP-II, to high degree, inherits these goals as the goals for future developments and upgrades. This document (PIP-II Reference Design Report) describes an initial step in the development of the Fermilab accelerating complex. The plan described in this Report balances the far-term goals of the Laboratory

  5. 40 CFR 72.22 - Alternate designated representative.

    Science.gov (United States)

    2010-07-01

    ... designated representative is selected shall include a procedure for the owners and operators of the source and affected units at the source to authorize the alternate designated representative to act in lieu...) In the event of a conflict, any action taken by the designated representative shall take precedence...

  6. Conceptual design study on inertial confinement reactor ''SENRI-II''

    International Nuclear Information System (INIS)

    Nakamura, N.; Ouura, H.

    1983-01-01

    Design features of a laser fusion reactor concept SENRI-II are reviewed and discussed. A conceptual design study of the ICF reactor SENRI-II (an advanced design of SENRI-I) has been carried out over 2 years in the Research Committee of ICF Reactors, Institute of Laser Engineering, Osaka University. While the ICF reactor SENRI-I utilized a magnetic field to guide and control an inner liquid lithium flow, SENRI-II is designed to use porous metal as the liquid lithium flow guide. In the design of SENRI-II, a metal porous lithium blanket serves as the protection of a wall against fusion products and as wall per se. Because of the separation of these two functions, a high power density can be attained

  7. Digital logic circuit design with ALTERA MAX+PLUS II

    International Nuclear Information System (INIS)

    Lee, Seung Ho; Park, Yong Su; Park, Gun Jong; Lee, Ju Heon

    2006-09-01

    This book is composed of five parts. The first part has introduction of ALTERA MAX+PLUS II and graphic editor, text editor, compiler, waveform editor simulator and timing analyzer of it. The second part is about direction of digital logic circuit design with training kit. The third part has grammar and practice of VHDL in ALTERA MAX+PLUS II including example and history of VHDL. The fourth part shows the design example of digital logic circuit by VHDL of ALTERA MAX+PLUS II which lists designs of adder and subtractor, code converter, counter, state machine and LCD module. The last part explains design example of digital logic circuit by graphic editor in ALTERA MAX+PLUS II.

  8. DESIGN ALTERNATIVES ON THE LAMINATES

    Directory of Open Access Journals (Sweden)

    Gökay Nemli

    2004-04-01

    Full Text Available Wood based panel manufacturers use increasing volumes of laminates. Laminates are resistant to the water, humidity, scratch, abrasion, burning and chemicals. These products consist of printed decor papers that have been saturated with thermosetting resin. In this study, laminate types, composition form and design alternatives were investigated.

  9. Overview of the TIBER II design

    International Nuclear Information System (INIS)

    Henning, C.D.; Logan, B.G.

    1987-01-01

    The TIBER II Tokamak Ignition/Burn Experimental Reactor design is the result of efforts by numerous people and institutions, including many fusion laboratories, universities, and industries. This overview attempts to place the work in perspective. Major features of the design are compact size, low cost, and steady-state operation. These are achieved through plasma shaping and innovative features such as radiation tolerant magnets and optimized shielding. While TIBER II can operate in a pulsed mode, steady-state is preferred for nuclear testing. Current drive is achieved by a combination of lower hybrid and neutral beams. In addition to 10 MW of ECR is added for disruption control and current drive profiling

  10. Technical design aspects of Feasibility Study-II

    International Nuclear Information System (INIS)

    Zisman, Michael S.

    2001-01-01

    Feasibility Study-II examined a high-performance Neutrino Factory providing 1 x 10 20 neutrinos per year aimed at a long-baseline detector. The Study was sponsored jointly by BNL and the Neutrino Factory and Muon Collider Collaboration ration (MC) and is based on a 1 MW proton driver operating at 24 GeV, i.e., an upgraded version of the AGS accelerator. Compared with the earlier FNAL-sponsored study (Feasibility Study-I), there is a sixfold improvement in performance. Here we describe details of the implementation of Study-II concepts and discuss their efficacy. Alternative approaches that will be pursued in follow-on R and D activities are also described briefly

  11. PEP-II design update and R ampersand D results

    International Nuclear Information System (INIS)

    Zisman, M.S.

    1993-01-01

    We describe the present status of the PEP-II asymmetric β factory design undertaken by SLAC, LBL, and LLNL. Design optimization during the past year and changes from the original CDR design are described. R ampersand D activities have focused primarily on the key technology areas of vacuum, RF, and feedback system design. Recent progress in these areas is described. The R ampersand D results have verified our design assumptions and provide further confidence in the design of PEP-II

  12. Design of clinical trials Phase I and II with radiopharmaceuticals

    International Nuclear Information System (INIS)

    Giannone, C.A.; Soroa, V.E.

    2015-01-01

    We presented some usual designs for clinical studies in Phase I and Phase II. For Phase I we considered the 3 + 3 Classic design, designs with accelerated titration and those with dose escalation schemes with overdose control (EWOC). For Phase II designs with efficacy outcomes are presented. The design proposed by Fleming is discussed as well as those with inclusion of patients in two stages: Gehan’s design and the Optimal two–stage Simon’s design. We also discussed the design of combined endpoints of efficacy and safety of Bryant and Day with an application example of therapeutically Lu-177. Finally some proposals for phase II trials with control group are considered. (authors) [es

  13. Design concepts for PBFA-II's applied-B ion diode

    International Nuclear Information System (INIS)

    Rovang, D.C.

    1985-01-01

    The lithium ion diode to be used at the center of Particle Beam Fusion Accelerator-II (PBFA-II) at Sandia National Laboratories is an applied-B ion diode. The center section of the PBFA-II accelerator is where the electrical requirements of the accelerator, the design requirements of the diode, and the operational requirements must all be satisfied simultaneously for a successful experiment. From an operational standpoint, the ion diode is the experimental hub of the accelerator and needs to be easily and quickly installed and removed. Because of the physical size and geometry of the PBFA-II center section, achieving the operational requirements has presented an interesting design challenge. A discussion of the various design requirements and the proposed concepts for satisfying them is presented

  14. Reference design for LAMPF II

    International Nuclear Information System (INIS)

    Thiessen, H.A.

    1983-01-01

    A reference design for the 32-GeV LAMPF II proton accelerator is proposed. This design consists of a 30-Hz rapid-cycling synchrotron with a dc stretcher. A superiodicity 5 design with dispersion-free straight sections is suggested for both machines. Beam-dynamics calculations are partially complete and rf requirements are given. Apertures are calculated for 2 x 10 13 protons per pulse (100 μA average current). No significant problems are observed at any time in the cycle in a longitudinal beam-dynamics simulation including space charge

  15. UWMAK-II: a conceptual tokamak reactor design

    International Nuclear Information System (INIS)

    1975-10-01

    This report describes the conceptual design of a Tokamak fusion power reactor, UWMAK-II. The aim of this study is to perform a self consistent and thorough analysis of a probable future fusion power reactor in order to assess the technological problems posed by such a system and to examine feasible solutions. UWMAK-II is a conceptual Tokamak fusion reactor designed to deliver 1716 MWe continuously and to generate 5000 MW(th) during the plasma burn. The structural material is 316 stainless steel and the primary coolant is helium. UWMAK-II is a low aspect ratio, low field design and includes a double null, axisymmetric poloidal field divertor for impurity control. In addition, a carbon curtain, made of two dimensional woven carbon fiber, is mounted on the first vacuum chamber wall to protect the plasma from high Z impurities and to protect the first wall from erosion by charged particle bombardment. The blanket is designed to minimize the inventory of both tritium and lithium while achieving a breeding ratio greater than one. This has led to a blanket design based on the use of a solid breeding material (LiAlO 2 ) with beryllium as a neutron multiplier. The lithium is enriched to 90 percent 6 Li and the blanket coolant is helium at a maximum pressure of 750 psia (5.2 x 10 6 N/m 2 ). A cell of the UWMAK-II blanket design is shown. The breeding ratio is between 1.11 and 1.19 based on one-dimensional discrete ordinates transport calculations, depending on the method of homogenization. Detailed Monte Carlo calculations, which take into account the more complicated geometry, give a breeding ratio of 1.06. The total energy per fusion is 21.56 MeV, which is fairly high

  16. National Ignition Facility Title II Design Plan

    International Nuclear Information System (INIS)

    Kumpan, S

    1997-01-01

    This National Ignition Facility (NIF) Title II Design Plan defines the work to be performed by the NIF Project Team between November 1996, when the U.S. Department of Energy (DOE) reviewed Title I design and authorized the initiation of Title H design and specific long-lead procurements, and September 1998, when Title 11 design will be completed

  17. Three-dimensional tetranuclear Cd(II) coordination network based on a 1,3-alternate calix[4]arene derivative

    International Nuclear Information System (INIS)

    Lee, Eun Ji; Ju, Hui Yeong; Park, Ki Min; Moon, ASuk Hee; Kang, Young Jin

    2015-01-01

    Polynuclear coordination polymers can exhibit more intriguing network topologies and better functionalities than those of common complexes because they have metal-cluster nodes for the construction of multidimensional frameworks and the potential applications induced by collaborative activities between metal ions. New tetranuclear Cd(II) coordination polymer 1 based on 1,3-alternate calix arene derivative (H_4 CTA) with four carboxyl pendant arms has been synthesized by the solvo thermal reaction at 110 .deg. C for 2 days. Compound 1 shows a 3-D framework consisting of tetranuclear Cd(II) cluster core as a metal-cluster node and 1,3-alternate H_4CTA as a multidentate linker. The coordination polymer 1 displays intense blue emission, implying that this tetranuclear Cd(II) coordination polymer could be a suitable material in the area of luminescence research

  18. Alternate design of ITER cryostat skirt support system

    International Nuclear Information System (INIS)

    Pandey, Manish Kumar; Gupta, Girish Kumar; Bhardwaj, Anil Kumar; Jha, Saroj Kumar

    2015-01-01

    The skirt support of ITER cryostat is a support system which takes all the load of cryostat cylinder and dome during normal and operational condition. The present design of skirt support has full penetration weld joints at the bottom (shell to horizontal plate joint). To fulfill the requirements of tolerances and control the welding distortions, we have proposed to change the full penetration weld into fillet weld. A detail calculation is done to check the feasibility and structural impact due to proposed design. The calculations provide the size requirements of fillet weld. To verify the structural integrity during most severe load case, finite element analysis (FEA) has been done in line with ASME section VIII division 2. By FEA 'Plastic Collapse' and 'Local Failure' modes has been assessed. 5° sector of skirt clamp has been modeled in CATIA V5 R21 and used in FEA. Fillet weld at shell to horizontal plate joint has been modeled and symmetry boundary condition at ± 2.5° applied. 'Elastic Plastic Analysis' has been performed for the most severe loading case i.e. Category IV loading. The alternate design of Cryostat Skirt support system has been found safe by analysis against Plastic collapse and Local Failure Modes with load proportionality factor 2.3. Alternate design of Cryostat skirt support system has been done and validated by FEA. As per alternate design, the proposal of fillet weld has been implemented in manufacturing. (author)

  19. Design analysis of engineered alternatives for the Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    Myers, J.; Djordjevic, S.; Adams, M.; Spangler, L.; Valdez, J.; Vetter, D.; Drez, P.

    1991-01-01

    The effectiveness of several engineered alternatives, designed to enhance the performance of the Waste Isolation Pilot Plant (WIPP), were evaluated relative to the performance of the baseline design. This evaluation was performed using a computer program referred to as the Design Analysis Model which couples salt creep closure, brine inflow, gas generation and dissipation to realistically simulate these interrelated processes over a 10,000 year period following the decommissioning of the repository. Analyses of the baseline design and nine alternative designs were performed for the undisturbed repository conditions, as well as three human intrusion events. Improvements in repository performance of up to four orders of magnitude were predicted for various engineered alternative waste forms. 6 refs., 8 figs., 1 tab

  20. Alternative design concept for the second Glass Waste Storage Building

    International Nuclear Information System (INIS)

    Rainisch, R.

    1992-10-01

    This document presents an alternative design concept for storing canisters filled with vitrified waste produced at the Defense Waste Processing Facility (DWPF). The existing Glass Waste Storage Building (GWSB1) has the capacity to store 2,262 canisters and is projected to be completely filled by the year 2000. Current plans for glass waste storage are based on constructing a second Glass Waste Storage Building (GWSB2) once the existing Glass Waste Storage Building (GWSB1) is filled to capacity. The GWSB2 project (Project S-2045) is to provide additional storage capacity for 2,262 canisters. This project was initiated with the issue of a basic data report on March 6, 1989. In response to the basic data report Bechtel National, Inc. (BNI) prepared a draft conceptual design report (CDR) for the GWSB2 project in April 1991. In May 1991 WSRC Systems Engineering issued a revised Functional Design Criteria (FDC), the Rev. I document has not yet been approved by DOE. This document proposes an alternative design for the conceptual design (CDR) completed in April 1991. In June 1992 Project Management Department authorized Systems Engineering to further develop the proposed alternative design. The proposed facility will have a storage capacity for 2,268 canisters and will meet DWPF interim storage requirements for a five-year period. This document contains: a description of the proposed facility; a cost estimate of the proposed design; a cost comparison between the proposed facility and the design outlined in the FDC/CDR; and an overall assessment of the alternative design as compared with the reference FDC/CDR design

  1. Three-dimensional tetranuclear Cd(II) coordination network based on a 1,3-alternate calix[4]arene derivative

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Eun Ji; Ju, Hui Yeong; Park, Ki Min [Dept. of Chemistry and Research Institute of Natural Science, Gyeongsang National University, Jinju (Korea, Republic of); Moon, ASuk Hee [Dept. of Food and Nutrition, Kyungnam College of Inform ation and Technology, Busan (Korea, Republic of); Kang, Young Jin [Div. of cience Education, Kangwon National University, Chuncheon (Korea, Republic of)

    2015-08-15

    Polynuclear coordination polymers can exhibit more intriguing network topologies and better functionalities than those of common complexes because they have metal-cluster nodes for the construction of multidimensional frameworks and the potential applications induced by collaborative activities between metal ions. New tetranuclear Cd(II) coordination polymer 1 based on 1,3-alternate calix arene derivative (H{sub 4} CTA) with four carboxyl pendant arms has been synthesized by the solvo thermal reaction at 110 .deg. C for 2 days. Compound 1 shows a 3-D framework consisting of tetranuclear Cd(II) cluster core as a metal-cluster node and 1,3-alternate H{sub 4}CTA as a multidentate linker. The coordination polymer 1 displays intense blue emission, implying that this tetranuclear Cd(II) coordination polymer could be a suitable material in the area of luminescence research.

  2. Demonstration of a free piston Stirling engine driven linear alternator system. Annual report

    International Nuclear Information System (INIS)

    1978-01-01

    The objective of the program is to develop a 2 kW Free Piston Stirling Engine/Linear Alternator Energy Conversion System for an isotopic heat source with a greater than 30% overall efficiency. The work was broken up into two phases. Phase I demonstrated the feasibility of the energy conversion system through analysis and experimental testing of the individual components. Phase II is a two-year effort to design, fabricate, and test a prototype demonstrator energy conversion system. The reprt documents the work performed during October 1976 through September 1977, the first year of Phase II. Details of the tasks are presented in five major sections: (1) Linear Alternator Development; (2) Engine/Alternator System Demonstration; (3) Demonstrator Preliminary Design; (4) Demonstrator Detailed Design; and (5) Development of Free Piston Stirling Engine Computer Simulation

  3. Lessons learned by southern states in designating alternative routes

    International Nuclear Information System (INIS)

    1989-08-01

    The purpose of this report is to discuss the ''lessons learned'' by the five states within the southem region that have designated alternative or preferred routes under the regulations of the Department of Transportation (DOT) established for the transportation of radioactive materials. The document was prepared by reviewing applicable federal laws and regulations, examining state reports and documents and contacting state officials and routing agencies involved in making routing decisions. In undertaking this project, the Southern States Energy Board hopes to reveal the process used by states that have designated alternative routes and thereby share their experiences (i.e., lessons learned) with other southern states that have yet to make designations. Under DOT regulations (49 CFR 177.826), carriers of highway route controlled quantities of radioactive materials (which include spent nuclear fuel and high-level waste) must use preferred routes selected to reduce time in transit. Such preferred routes consist of (1) an interstate system highway with use of an interstate system bypass or beltway around cities when available, and (2) alternate routes selected by a ''state routing agency.''

  4. 40 CFR 60.4112 - Changing Hg designated representative and alternate Hg designated representative; changes in...

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false Changing Hg designated representative and alternate Hg designated representative; changes in owners and operators. 60.4112 Section 60.4112... Generating Units Hg Designated Representative for Hg Budget Sources § 60.4112 Changing Hg designated...

  5. Bayesian enhancement two-stage design for single-arm phase II clinical trials with binary and time-to-event endpoints.

    Science.gov (United States)

    Shi, Haolun; Yin, Guosheng

    2018-02-21

    Simon's two-stage design is one of the most commonly used methods in phase II clinical trials with binary endpoints. The design tests the null hypothesis that the response rate is less than an uninteresting level, versus the alternative hypothesis that the response rate is greater than a desirable target level. From a Bayesian perspective, we compute the posterior probabilities of the null and alternative hypotheses given that a promising result is declared in Simon's design. Our study reveals that because the frequentist hypothesis testing framework places its focus on the null hypothesis, a potentially efficacious treatment identified by rejecting the null under Simon's design could have only less than 10% posterior probability of attaining the desirable target level. Due to the indifference region between the null and alternative, rejecting the null does not necessarily mean that the drug achieves the desirable response level. To clarify such ambiguity, we propose a Bayesian enhancement two-stage (BET) design, which guarantees a high posterior probability of the response rate reaching the target level, while allowing for early termination and sample size saving in case that the drug's response rate is smaller than the clinically uninteresting level. Moreover, the BET design can be naturally adapted to accommodate survival endpoints. We conduct extensive simulation studies to examine the empirical performance of our design and present two trial examples as applications. © 2018, The International Biometric Society.

  6. Ship Pipe Routing Design Using NSGA-II and Coevolutionary Algorithm

    Directory of Open Access Journals (Sweden)

    Wentie Niu

    2016-01-01

    Full Text Available Pipe route design plays a prominent role in ship design. Due to the complex configuration in layout space with numerous pipelines, diverse design constraints, and obstacles, it is a complicated and time-consuming process to obtain the optimal route of ship pipes. In this article, an optimized design method for branch pipe routing is proposed to improve design efficiency and to reduce human errors. By simplifying equipment and ship hull models and dividing workspace into three-dimensional grid cells, the mathematic model of layout space is constructed. Based on the proposed concept of pipe grading method, the optimization model of pipe routing is established. Then an optimization procedure is presented to deal with pipe route planning problem by combining maze algorithm (MA, nondominated sorting genetic algorithm II (NSGA-II, and cooperative coevolutionary nondominated sorting genetic algorithm II (CCNSGA-II. To improve the performance in genetic algorithm procedure, a fixed-length encoding method is presented based on improved maze algorithm and adaptive region strategy. Fuzzy set theory is employed to extract the best compromise pipeline from Pareto optimal solutions. Simulation test of branch pipe and design optimization of a fuel piping system were carried out to illustrate the design optimization procedure in detail and to verify the feasibility and effectiveness of the proposed methodology.

  7. Linac Coherent Light Source II (LCLS-II) Conceptual Design Report

    International Nuclear Information System (INIS)

    Stohr, J.

    2011-01-01

    The LCLS-II Project is designed to support the DOE Office of Science mission, as described in the 22 April 2010 Mission Need Statement. The scope of the Project was chosen to provide an increase in capabilities and capacity for the facility both at project completion in 2017 and in the subsequent decade. The Project is designed to address all points of the Mission Need Statement (MNS): (1) Expanded spectral reach; (2) Capability to provide x-ray beams with controllable polarization; (3) Capability to provide 'pump' pulses over a vastly extended range of photon energies to a sample, synchronized to LCLS-II x-ray probe pulses with controllable inter-pulse time delay; and (4) Increase of user access through parallel rather than serial x-ray beam use within the constraint of a $300M-$400M Total Project Cost (TPC) range. The LCLS-II Project will construct: (1) A hard x-ray undulator source (2-13 keV); (2) A soft x-ray undulator source (250-2,000 eV); (3) A dedicated, independent electron source for these new undulators, using sectors 10-20 of the SLAC linac; (4) Modifications to existing SLAC facilities for the injector and new shielded enclosures for the undulator sources, beam dumps and x-ray front ends; (5) A new experiment hall capable of accommodating four experiment stations; and (6) Relocation of the two soft x-ray instruments in the existing Near Experiment Hall (NEH) to the new experiment hall (Experiment Hall-II). A key objective of LCLS-II is to maintain near-term international leadership in the study of matter on the fundamental atomic length scale and the associated ultrafast time scales of atomic motion and electronic transformation. Clearly, such studies promise scientific breakthroughs in key areas of societal needs like energy, environment, health and technology, and they are uniquely enabled by forefront X-ray Free Electron Laser (X-FEL) facilities. While the implementation of LCLS-II extends to about 2017, it is important to realize that LCLS-II only

  8. PEP-II: An asymmetric B factory. Conceptual design report

    Energy Technology Data Exchange (ETDEWEB)

    1993-06-01

    In this report, the authors have described an updated conceptual design for the high-luminosity Asymmetric B Factory (PEP-II) to be built in the PEP tunnel culmination of more than four years of effort aimed at the design and construction of an asymmetric e{sub +}e{sub {minus}} collider capable of achieving a luminosity of L = 3 {times} 10{sup 33} cm{sup {minus}2} s{sup {minus}1}. All aspects of the conceptual design were scrutinized in March 1991 by a DOE technical review committee chaired by Dr. L. Edward Temple. The design was deemed feasible and capable of achieving its physics goals. Furthermore, the cost estimate, schedule, and management plan for the project were fully endorsed by the committee. This updated conceptual design report captures the technical progress since the March 1991 review and reflects the lower cost estimate corresponding to the improved design. Although the PEP-II design has continued to evolve, no technical scope changes have been made that invalidate the conclusion of the DOE review. The configuration adopted utilizes two storage rings, an electron ring operating at 9 GeV and a positron ring at 3.1 GeV, each with a circumference of 2200 m. The high-energy ring is an upgrade of the PEP storage ring at SLAC; all PEP magnets and most power supplies will be reused. The upgrade consists primarily of replacing the PEP vacuum chamber and RF system with newly designed versions optimized for the high-current environment of PEP-II. The low-energy ring will be newly constructed and will be situated atop the high-energy ring in the PEP tunnel. Utilities already installed in the PEP tunnel are largely sufficient to operate the two PEP-II storage rings.

  9. Alternative dipole magnets for ISABELLE

    Science.gov (United States)

    Taylor, C.; Althaus, R.; Caspi, S.; Gilbert, W.; Hassenzahl, W. V.; Meuser, R.; Rechen, J.; Warren, R.

    1982-05-01

    A dipole magnet, intended as a possible alternative for the ISABELLE main ring magnet, was designed. Three layers of FNAL Doubler/Saver conductor were used. Two 1.3-m-long models were built and tested, both with and without an iron core, and in both helium I and helium II. The training behavior, cyclic energy loss, point of quench initiation, and quench velocity were determined. A central field of 6.5 tesla was obtained in He I (4.4 K), and 7.6 tesla in He II (1.8K).

  10. WAG (water-alternating-gas) process design: an update review

    Energy Technology Data Exchange (ETDEWEB)

    Zahoor, M.K. [University of Engineering and Technology, Lahore (Pakistan). Dept. of Petroleum and Gas Engineering], e-mail: mkzahoor@uet.edu.pk; Derahman, M.N.; Yunan, M.H. [Universiti Teknologi Malaysia, Johor (Malaysia). Dept. of Petroleum Engineering

    2011-04-15

    The design and implementation of water-alternating-gas (WAG) process in an improved and cost-effective way are still under process. Due to the complexities involved in implementing the process and the lack of information regarding fluid and reservoir properties, the water-alternating-gas process has not yet been as successful as initially expected. This situation can be overcome by better understanding the fluid distribution and flow behavior within the reservoir. The ultimate purpose can be achieved with improved knowledge on wettability and its influence on fluid distribution, capillary pressure, relative permeability, and other design parameters. This paper gives an insight on the WAG process design and the recently developed correlations which are helpful in incorporating the effects of wettability variations on fluid dynamics within the reservoir. (author)

  11. DESIGNING GREENER SOLVENTS

    Science.gov (United States)

    Computer-aided design of chemicals and chemical mixtures provides a powerful tool to help engineers identify cleaner process designs and more-benign alternatives to toxic industrial solvents. Three software programs are discussed: (1) PARIS II (Program for Assisting the Replaceme...

  12. Subsurface barrier design alternatives for confinement and controlled advection flow

    International Nuclear Information System (INIS)

    Phillips, S.J.; Stewart, W.E.; Alexander, R.G.; Cantrell, K.J.; McLaughlin, T.J.

    1994-02-01

    Various technologies and designs are being considered to serve as subsurface barriers to confine or control contaminant migration from underground waste storage or disposal structures containing radioactive and hazardous wastes. Alternatives including direct-coupled flood and controlled advection designs are described as preconceptual examples. Prototype geotechnical equipment for testing and demonstration of these alternative designs tested at the Hanford Geotechnical Development and Test Facility and the Hanford Small-Tube Lysimeter Facility include mobile high-pressure injectors and pumps, mobile transport and pumping units, vibratory and impact pile drivers, and mobile batching systems. Preliminary laboratory testing of barrier materials and additive sequestering agents have been completed and are described

  13. Preliminary design analysis of the ALT-II limiter for TEXTOR

    International Nuclear Information System (INIS)

    Koski, J.A.; Boyd, R.D.; Kempka, S.M.; Romig, A.D. Jr.; Smith, M.F.; Watson, R.D.; Whitley, J.B.; Conn, R.W.; Grotz, S.P.

    1983-01-01

    Installation of a large toroidal belt pump limiter, Advanced Limiter Test II (ALT-II), on the TEXTOR tokamak at Juelich, FRG is anticipated for early 1986. This paper discusses the preliminary mechanical design and materials considerations undertaken as part of the feasibility study phase for ALT-II

  14. The NDCX-II engineering design

    Energy Technology Data Exchange (ETDEWEB)

    Waldron, W.L., E-mail: WLWaldron@lbl.gov [Lawrence Berkeley National Laboratory, Berkeley, CA 94720 (United States); Abraham, W.J.; Arbelaez, D. [Lawrence Berkeley National Laboratory, Berkeley, CA 94720 (United States); Friedman, A. [Lawrence Livermore National Laboratory, Livermore, CA 94550 (United States); Galvin, J.E. [Lawrence Berkeley National Laboratory, Berkeley, CA 94720 (United States); Gilson, E.P. [Princeton Plasma Physics Laboratory, Princeton, NJ 08543 (United States); Greenway, W.G. [Lawrence Berkeley National Laboratory, Berkeley, CA 94720 (United States); Grote, D.P. [Lawrence Livermore National Laboratory, Livermore, CA 94550 (United States); Jung, J.-Y.; Kwan, J.W.; Leitner, M.; Lidia, S.M.; Lipton, T.M.; Reginato, L.L.; Regis, M.J.; Roy, P.K. [Lawrence Berkeley National Laboratory, Berkeley, CA 94720 (United States); Sharp, W.M. [Lawrence Livermore National Laboratory, Livermore, CA 94550 (United States); Stettler, M.W.; Takakuwa, J.H.; Volmering, J. [Lawrence Berkeley National Laboratory, Berkeley, CA 94720 (United States); and others

    2014-01-01

    The Neutralized Drift Compression Experiment (NDCX-II) is a user facility located at Lawrence Berkeley National Laboratory which is uniquely designed for ion-beam-driven high energy density laboratory physics and heavy ion fusion research. Construction was completed in March 2012 and the facility is now in the commissioning phase. A significant amount of engineering was carried out in order to meet the performance parameters required for a wide range of target heating experiments while making the most cost-effective use of high-value hardware available from a decommissioned high current electron induction accelerator. The technical challenges and design of this new ion induction accelerator facility are described.

  15. Any light particle search II. Technical Design Report

    International Nuclear Information System (INIS)

    Baehre, Robin; Doebrich, Babette; Dreyling-Eschweiler, Jan

    2013-02-01

    This document constitutes an excerpt of the Technical Design Report for the second stage of the ''Any Light Particle Search'' (ALPS-II) at DESY as submitted to the DESY PRC in August 2012 and reviewed in November 2012. ALPS-II is a ''Light Shining through a Wall'' experiment which searches for photon oscillations into weakly interacting sub-eV particles. These are often predicted by extensions of the Standard Model and motivated by astrophysical phenomena. The first phases of the ALPS-II project were approved by the DESY management on February 21st, 2013.

  16. Any light particle search II. Technical Design Report

    Energy Technology Data Exchange (ETDEWEB)

    Baehre, Robin [Albert Einstein Institute, Hannover (Germany); Doebrich, Babette; Dreyling-Eschweiler, Jan [Deutsches Elektronen-Synchrotron, Hamburg (Germany); and others

    2013-02-15

    This document constitutes an excerpt of the Technical Design Report for the second stage of the ''Any Light Particle Search'' (ALPS-II) at DESY as submitted to the DESY PRC in August 2012 and reviewed in November 2012. ALPS-II is a ''Light Shining through a Wall'' experiment which searches for photon oscillations into weakly interacting sub-eV particles. These are often predicted by extensions of the Standard Model and motivated by astrophysical phenomena. The first phases of the ALPS-II project were approved by the DESY management on February 21st, 2013.

  17. Linac Coherent Light Source II (LCLS-II) Conceptual Design Report

    Energy Technology Data Exchange (ETDEWEB)

    Stohr, J

    2011-11-16

    The LCLS-II Project is designed to support the DOE Office of Science mission, as described in the 22 April 2010 Mission Need Statement. The scope of the Project was chosen to provide an increase in capabilities and capacity for the facility both at project completion in 2017 and in the subsequent decade. The Project is designed to address all points of the Mission Need Statement (MNS): (1) Expanded spectral reach; (2) Capability to provide x-ray beams with controllable polarization; (3) Capability to provide 'pump' pulses over a vastly extended range of photon energies to a sample, synchronized to LCLS-II x-ray probe pulses with controllable inter-pulse time delay; and (4) Increase of user access through parallel rather than serial x-ray beam use within the constraint of a $300M-$400M Total Project Cost (TPC) range. The LCLS-II Project will construct: (1) A hard x-ray undulator source (2-13 keV); (2) A soft x-ray undulator source (250-2,000 eV); (3) A dedicated, independent electron source for these new undulators, using sectors 10-20 of the SLAC linac; (4) Modifications to existing SLAC facilities for the injector and new shielded enclosures for the undulator sources, beam dumps and x-ray front ends; (5) A new experiment hall capable of accommodating four experiment stations; and (6) Relocation of the two soft x-ray instruments in the existing Near Experiment Hall (NEH) to the new experiment hall (Experiment Hall-II). A key objective of LCLS-II is to maintain near-term international leadership in the study of matter on the fundamental atomic length scale and the associated ultrafast time scales of atomic motion and electronic transformation. Clearly, such studies promise scientific breakthroughs in key areas of societal needs like energy, environment, health and technology, and they are uniquely enabled by forefront X-ray Free Electron Laser (X-FEL) facilities. While the implementation of LCLS-II extends to about 2017, it is important to realize that

  18. Computational issues in alternating projection algorithms for fixed-order control design

    DEFF Research Database (Denmark)

    Beran, Eric Bengt; Grigoriadis, K.

    1997-01-01

    Alternating projection algorithms have been introduced recently to solve fixed-order controller design problems described by linear matrix inequalities and non-convex coupling rank constraints. In this work, an extensive numerical experimentation using proposed benchmark fixed-order control design...... examples is used to indicate the computational efficiency of the method. These results indicate that the proposed alternating projections are effective in obtaining low-order controllers for small and medium order problems...

  19. Matter of transformation : designing an alternative tomorrow inspired by phenomenology

    NARCIS (Netherlands)

    Hummels, C.C.M.; Lévy, P.D.

    2013-01-01

    In this month’s cover story, Caroline Hummels and Pierre Lévy propose an alternative, value-based vision for design: Can we create alternative ways to engage with the world based on trusting our senses? Where intuition is as valuable as logic? Where commitment and engagement are valuable assets for

  20. Any light particle search II. Technical Design Report

    Energy Technology Data Exchange (ETDEWEB)

    Baehre, Robin [Albert Einstein Institute, Hannover (Germany); Doebrich, Babette; Dreyling-Eschweiler, Jan [Deutsches Elektronen-Synchrotron, Hamburg (Germany)] [and others

    2013-02-15

    This document constitutes an excerpt of the Technical Design Report for the second stage of the ''Any Light Particle Search'' (ALPS-II) at DESY as submitted to the DESY PRC in August 2012 and reviewed in November 2012. ALPS-II is a ''Light Shining through a Wall'' experiment which searches for photon oscillations into weakly interacting sub-eV particles. These are often predicted by extensions of the Standard Model and motivated by astrophysical phenomena. The first phases of the ALPS-II project were approved by the DESY management on February 21st, 2013.

  1. Alternative Design of Boat Fenders

    DEFF Research Database (Denmark)

    Banke, Lars

    1996-01-01

    for the installation of the fender and perhaps for removing it if new oil-risers are to be initialled. The use of crane boats is expensive and weather-dependent.With these effect sin mind, a study of the energy absorption in the fender system, i.e. the fender itself and the frame, is needed for further development......On offshore platforms the purpose of fenders is to protect the oil-risers against minor accidental collisions with supply vessels. Normally, the fender is designed by use of thin-walled tubes. However, the tube itself is not capable of resisting the impact load of the boat. Therefore, alternative...... designs are searched for the fender.Today, an often used improvement of the fender is to fill it with grout or concrete. However, this improvement is not optimal since the fillings increase the weight of the fender beyond the crane capacity of the platform. Thus, crane boats are needed...

  2. The Optical Design of the PEP-II Injection Beamlines

    CERN Document Server

    Fieguth, T

    1996-01-01

    The optical design of the PEP-II electron and positron Injection Beamlines is described. Use of the existing high power, low emittance beams available from the SLC damping rings require that pulsed extraction of 9.0 GeV electrons and 3.1 GeV positrons for injection into the PEP-II rings occur in the early sectors of the accelerator. More than 5 kilometers of new beam transport lines have been designed and are being constructed to bring these beams to their respective rings. The optical design maximizes the tolerance to errors especially to those contributing to beam size and position jitter. Secondly, the design minimizes costs by utilizing existing components or component designs and minimizing the number required. Here we discuss important attributes including choice of lattice, specification of error tolerances, including errors in construction, alignment, field errors, power supply stability, and orbit correction.

  3. The Optical Design of the PEP-II Injection Beamlines

    Energy Technology Data Exchange (ETDEWEB)

    Fieguth, Ted

    2003-05-23

    The optical design of the PEP-II electron and positron Injection Beamlines is described. Use of the existing high power, low emittance beams available from the SLC damping rings require that pulsed extraction of 9.0 GeV electrons and 3.1 GeV positrons for injection into the PEP-II rings occur in the early sectors of the accelerator. More than 5 kilometers of new beam transport lines have been designed and are being constructed to bring these beams to their respective rings. The optical design maximizes the tolerance to errors especially to those contributing to beam size and position jitter. Secondly, the design minimizes costs by utilizing existing components or component designs and minimizing the number required. Here we discuss important attributes including choice of lattice, specification of error tolerances, including errors in construction, alignment, field errors, power supply stability, and orbit correction.

  4. Blade System Design Study. Part II, final project report (GEC).

    Energy Technology Data Exchange (ETDEWEB)

    Griffin, Dayton A. (DNV Global Energy Concepts Inc., Seattle, WA)

    2009-05-01

    As part of the U.S. Department of Energy's Low Wind Speed Turbine program, Global Energy Concepts LLC (GEC)1 has studied alternative composite materials for wind turbine blades in the multi-megawatt size range. This work in one of the Blade System Design Studies (BSDS) funded through Sandia National Laboratories. The BSDS program was conducted in two phases. In the Part I BSDS, GEC assessed candidate innovations in composite materials, manufacturing processes, and structural configurations. GEC also made recommendations for testing composite coupons, details, assemblies, and blade substructures to be carried out in the Part II study (BSDS-II). The BSDS-II contract period began in May 2003, and testing was initiated in June 2004. The current report summarizes the results from the BSDS-II test program. Composite materials evaluated include carbon fiber in both pre-impregnated and vacuum-assisted resin transfer molding (VARTM) forms. Initial thin-coupon static testing included a wide range of parameters, including variation in manufacturer, fiber tow size, fabric architecture, and resin type. A smaller set of these materials and process types was also evaluated in thin-coupon fatigue testing, and in ply-drop and ply-transition panels. The majority of materials used epoxy resin, with vinyl ester (VE) resin also used for selected cases. Late in the project, testing of unidirectional fiberglass was added to provide an updated baseline against which to evaluate the carbon material performance. Numerous unidirectional carbon fabrics were considered for evaluation with VARTM infusion. All but one fabric style considered suffered either from poor infusibility or waviness of fibers combined with poor compaction. The exception was a triaxial carbon-fiberglass fabric produced by SAERTEX. This fabric became the primary choice for infused articles throughout the test program. The generally positive results obtained in this program for the SAERTEX material have led to its

  5. ALT-II armor tile design for upgraded TEXTOR operation

    International Nuclear Information System (INIS)

    Newberry, B.L.; McGrath, R.T.; Watson, R.D.; Kohlhaas, W.; Finken, K.H.

    1994-01-01

    The upgrade of the TEXTOR tokamak at KFA Juelich was recently completed. This upgrade extended the TEXTOR pulse length from 5 seconds to 10 seconds. The auxiliary heating was increased to a total of 8.0 MW through a combination of neutral beam injection and radio frequency heating. Originally, the inertially cooled armor tiles of the full toroidal belt Advanced Limiter Test -- II (ALT-II) were designed for a 5-second operation with total heating of 6.0 MW. The upgrade of TEXTOR will increase the energy deposited per pulse onto the ALT-II by about 300%. Consequently, the graphite armor tiles for the ALT-II had to be redesigned to avoid excessively high graphite armor surface temperatures that would lead to unacceptable contamination of the plasma. This redesign took the form of two major changes in the ALT-II armor tile geometry. The first design change was an increase of the armor tile thermal mass, primarily by increasing the radial thickness of each tile from 17 mm to 20 mm. This increase in the radial tile dimension reduces the overall pumping efficiency of the ALT-II pump limiter by about 30%. The reduction in exhaust efficiency is unfortunate, but could be avoided only by active cooling of the ALT-II armor tiles. The active cooling option was too complicated and expensive to be considered at this time. The second design change involved redefining the plasma facing surface of each armor tile in order to fully utilize the entire surface area. The incident charged particle heat flux was distributed uniformly over the armor tile surfaces by carefully matching the radial, poloidal and toroidal curvature of each tile to the plasma flow in the TEXTOR boundary layer. This geometry redefinition complicates the manufacturing of the armor tiles, but results in significant thermal performance gains. In addition to these geometry upgrades, several material options were analyzed and evaluated

  6. Aseismic design of the Heysham II Nuclear Power Station

    International Nuclear Information System (INIS)

    Day, J.W.

    1983-01-01

    A brief description of the seismic criteria established for use with the Steam Generating Heavy Water Reactor (SCHWR) and taken for the Heysham II Project is given. The qualification strategy adopted for Heysham II is described, and a brief overview is given of some of the more important design changes required for seismic purposes on that station

  7. Solid Waste Operations Complex W-113, Detail Design Report (Title II). Volume 1: Title II design report

    International Nuclear Information System (INIS)

    1995-09-01

    The Solid Waste Retrieval Facility--Phase 1 (Project W113) will provide the infrastructure and the facility required to retrieve from Trench 04, Burial ground 4C, contact handled (CH) drums and boxes at a rate that supports all retrieved TRU waste batching, treatment, storage, and disposal plans. This includes (1) operations related equipment and facilities, viz., a weather enclosure for the trench, retrieval equipment, weighing, venting, obtaining gas samples, overpacking, NDE, NDA, shipment of waste and (2) operations support related facilities, viz., a general office building, a retrieval staff change facility, and infrastructure upgrades such as supply and routing of water, sewer, electrical power, fire protection, roads, and telecommunication. Title I design for the operations related equipment and facilities was performed by Raytheon/BNFL, and that for the operations support related facilities including infrastructure upgrade was performed by KEH. These two scopes were combined into an integrated W113 Title II scope that was performed by Raytheon/BNFL. Volume 1 provides a comprehensive narrative description of the proposed facility and systems, the basis for each of the systems design, and the engineering assessments that were performed to support the technical basis of the Title II design. The intent of the system description presented is to provide WHC an understanding of the facilities and equipment provided and the A/E's perspective on how these systems will operate

  8. ALT-II armor tile design for upgraded TEXTOR operation

    International Nuclear Information System (INIS)

    Newberry, B.L.; McGrath, R.T.; Watson, R.D.

    1994-01-01

    The upgrade of the TEXTOR tokamak at KFA Julich will be completed in the spring of 1994. The upgrade will extend the TEXTOR pulse length from 5 seconds to 10 seconds. The auxiliary heating systems are also scheduled to be upgraded so that eventually a total of 8.0 MW auxiliary heating will be available through a combination of neutral beam injection and radio frequency heating. Originally, the inertially cooled armor tiles on the full toroidal belt Advanced Limiter Test - II (ALT-II) were designed for 5-second operation with a total heating power of 6.0 MW. The upgrade of TEXTOR will increase the energy deposited per pulse onto ALT-II by more than 300%. Consequently, the graphite armor tiles for ALT-II had to be redesigned in order to increase their thermal inertia and, thereby, avoid excessively high graphite armor surface temperatures that would lead to unacceptable contamination of the plasma. The armor tile thermal inertia had been increase primarily by expanding the radial thickness of the tiles from 17 mm to 20 mm. This increase in radial tile dimension will reduce the overall pumping efficiency of the ALT-II pump limiter by about 30%. The final armor tile design was a compromise between increasing the power handling capability and reducing the particle exhaust efficiency of ALT-II. The reduction in exhaust efficiency is unfortunate, but could only be avoided by active cooling of the ALT-II armor tiles. The active cooling option was too complicated and expensive to be considered at this time

  9. HYLIFE-II reactor chamber design refinements

    International Nuclear Information System (INIS)

    House, P.A.

    1994-06-01

    Mechanical design features of the reactor chamber for the HYLIFE-II inertial confinement fusion power plant are presented. A combination of oscillating and steady, molten salt streams (Li 2 BeF 4 ) are used for shielding and blast protection of the chamber walls. The system is designed for a 6 Hz repetition rate. Beam path clearing, between shots, is accomplished with the oscillating flow. The mechanism for generating the oscillating streams is described. A design configuration of the vessel wall allows adequate cooling and provides extra shielding to reduce thermal stresses to tolerable levels. The bottom portion of the reactor chamber is designed to minimize splash back of the high velocity (>12 m/s) salt streams and also recover up to half of the dynamic head. Cost estimates for a 1 GWe and 2 GWe reactor chamber are presented

  10. The study, design and simulation of a free piston Stirling engine linear alternatorThe study, design and simulation of a free piston Stirling engine linear alternator

    Directory of Open Access Journals (Sweden)

    Teodora Susana Oros

    2014-12-01

    Full Text Available This paper presents a study, design and simulation of a Free Piston Stirling Engine Linear Alternator. There are presented the main steps of the magnetic and electric calculations for a permanent magnet linear alternator of fixed coil and moving magnets type. Finally, a detailed thermal, mechanical and electrical model for a Stirling engine linear alternator have been made in SIMULINK simulation program. The linear alternator simulation model uses a controllable DC voltage which simulates the linear alternator combined with a rectifier, a variable load and a DC-DC converter, which compensates for the variable nature of Stirling engine operation, and ensures a constant voltage output regardless of the load.

  11. Array design and expression evaluation in POOMA II

    Energy Technology Data Exchange (ETDEWEB)

    Karmesin, S.; Crotinger, J.; Cummings, J.; Haney, S.; Humphrey, W.; Reynders, J.; Smith, S.; Williams, T.J.

    1998-12-31

    POOMA is a templated C++ class library for use in the development of large-scale scientific simulations on serial and parallel computers. POOMA II is a new design and implementation of POOMA intended to add richer capabilities and greater flexibility to the framework. The new design employs a generic Array class that acts as an interface to, or view on, a wide variety of data representation objects referred to as engines. This design separates the interface and the representation of multidimensional arrays. The separation is achieved using compile-time techniques rather than virtual functions, and thus code efficiency is maintained. POOMA II uses PETE, the Portable Expression Template Engine, to efficiently represent complex mathematical expressions involving arrays and other objects. The representation of expressions is kept separate from expression evaluation, allowing the use of multiple evaluator mechanisms that can support nested where-block constructs, hardware-specific optimizations and different run-time environments.

  12. Preliminary design analysis of the ALT-II limiter for TEXTOR

    International Nuclear Information System (INIS)

    Koski, J.A.; Boyd, R.D.; Kempka, S.M.; Romig, A.D. Jr.; Smith, M.F.; Watson, R.D.; Whitley, J.B.; Conn, R.W.; Grotz, S.P.

    1984-01-01

    Installation of a large toroidal belt pump limiter, Advanced Limiter Test II (ALT-II), on the TEXTOR tokamak at Juelich, FRG is anticipated for early 1986. This paper discusses the preliminary mechanical design and materials considerations undertaken as part of the feasibility study phase for ALT-II. Since the actively cooled limiter blade is the component in direct contact with the plasma edge, and thus subject to the severe plasma environment, most preliminary design efforts have concentrated on analysis of the blade. The screening process which led to the recommended preliminary design consisting of a dispersion strenghthened copper or OFHC copper cover plate over an austenitic stainless steel base plate is discussed. A 1 to 3 mm thick low atomic number coating consisting of a graded plasma-sprayed Silicon Carbide-Aluminium composite is recommended subject to further experiment and evaluation. Thermal-hydraulic and stress analyses of the limiter blade are also discussed. (orig.)

  13. Demonstration of risk-based decision analysis in remedial alternative selection and design

    International Nuclear Information System (INIS)

    Evans, E.K.; Duffield, G.M.; Massmann, J.W.; Freeze, R.A.; Stephenson, D.E.

    1993-01-01

    This study demonstrates the use of risk-based decision analysis (Massmann and Freeze 1987a, 1987b) in the selection and design of an engineering alternative for groundwater remediation at a waste site at the Savannah River Site, a US Department of Energy facility in South Carolina. The investigation focuses on the remediation and closure of the H-Area Seepage Basins, an inactive disposal site that formerly received effluent water from a nearby production facility. A previous study by Duffield et al. (1992), which used risk-based decision analysis to screen a number of ground-water remediation alternatives under consideration for this site, indicated that the most attractive remedial option is ground-water extraction by wells coupled with surface water discharge of treated effluent. The aim of the present study is to demonstrate the iterative use of risk-based decision analysis throughout the design of a particular remedial alternative. In this study, we consider the interaction between two episodes of aquifer testing over a 6-year period and the refinement of a remedial extraction well system design. Using a three-dimensional ground-water flow model, this study employs (1) geostatistics and Monte Carlo techniques to simulate hydraulic conductivity as a stochastic process and (2) Bayesian updating and conditional simulation to investigate multiple phases of aquifer testing. In our evaluation of a remedial alternative, we compute probabilistic costs associated with the failure of an alternative to completely capture a simulated contaminant plume. The results of this study demonstrate the utility of risk-based decision analysis as a tool for improving the design of a remedial alternative through the course of phased data collection at a remedial site

  14. Helium-cooled pebble bed test blanket module alternative design and fabrication routes

    International Nuclear Information System (INIS)

    Lux, M.

    2007-01-01

    According to first results of the recently started European DEMO study, a new blanket integration philosophy was developed applying so-called multi-module segments. These consist of a number of blanket modules flexibly mounted onto a common vertical manifold structure that can be used for replacing all modules in one segment at one time through vertical remote-handling ports. This principle gives new freedom in the design choices applied to the blanket modules itself. Based on the alternative design options considered for DEMO also the ITER test blanket module was newly analyzed. As a result of these activities it was decided to keep the major principles of the reference design like stiffening grid, breeder unit concept and perpendicular arrangement of pebble beds related to the First Wall because of the very positive results of thermo-mechanical and neutronics studies. The present paper gives an overview on possible further design optimization and alternative fabrication routes. One of the most significant improvements in terms of the hydraulic performance of the Helium cooled reactor can be reached with a new First Wall concept. That concept is based on an internal heat transfer enhancement technique and allows drastically reducing the flow velocity in the FW cooling channels. Small ribs perpendicular to the flow direction (transverse-rib roughness) are arranged on the inner surface of the First Wall cooling channels at the plasma side. In the breeder units cooling plates which are mostly parallel but bent into U-shape at the plasma-side are considered. In this design all flow channels are parallel and straight with the flow entering on one side of the parallel plate sections and exiting on the other side. The ceramic pebble beds are embedded between two pairs of such type of cooling plates. Different modifications could possibly be combined, whereby the most relevant discussed in this paper are (i) rib-cooled First Wall channels, (ii) U-bent cooling plates for

  15. Environmental comparison of a railway bridge with alternative designs

    DEFF Research Database (Denmark)

    Du, Guangli; Karoumi, Raid

    2012-01-01

    Railway bridges are complex structures that remain for a long life span and consume large amount of material and energy throughout the life span. All of those lead to considerable resource depletion and environmental burdens. Life Cycle Assessment (LCA) has proved to be a comprehensive tool...... for quantifying and assessing the environmental impacts of the products through its whole life cycle. This paper presents a comparative case study between two alternative designs of Banafjäl Bridge: ballast track design and fixed slab track design. The methodology of LCA is utilized as a supporting tool...

  16. LWR design decision methodology: Phase II. Final report

    International Nuclear Information System (INIS)

    1981-01-01

    Techniques were identified to augment existing design process at the component and system level in order to optimize cost and safety between alternative system designs. The method was demonstrated using the Surry Low Pressure Injection System (LPIS). Three possible backfit options were analyzed for the Surry LPIS, assessing the safety level of each option and estimating the acquisition and installation costs for each

  17. Considerations for advanced reactor design based on EBR-II experience

    International Nuclear Information System (INIS)

    King, R. W.

    1999-01-01

    The long-term success of the Experimental Breeder Reactor-II (EBR-II) provides several insights into fundamental characteristics and design features of a nuclear generating station that enhance safety, operability, and maintainability. Some of these same characteristics, together with other features, offer the potential for operational lifetimes well beyond the current licensing time frame, and improved reliability that could potentially reduce amortized capital costs as well as overall operation and maintenance costs if incorporated into advanced plant designs. These features and characteristics are described and the associated benefits are discussed

  18. EBR-II Primary Tank Wash-Water Alternatives Evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Demmer, R. L.; Heintzelman, J. B.; Merservey, R. H.; Squires, L. N.

    2008-05-01

    The EBR-II reactor at Idaho National Laboratory was a liquid sodium metal cooled reactor that operated for 30 years. It was shut down in 1994; the fuel was removed by 1996; and the bulk of sodium metal coolant was removed from the reactor by 2001. Approximately 1100 kg of residual sodium remained in the primary system after draining the bulk sodium. To stabilize the remaining sodium, both the primary and secondary systems were treated with a purge of moist carbon dioxide. Most of the residual sodium reacted with the carbon dioxide and water vapor to form a passivation layer of primarily sodium bicarbonate. The passivation treatment was stopped in 2005 and the primary system is maintained under a blanket of dry carbon dioxide. Approximately 670 kg of sodium metal remains in the primary system in locations that were inaccessible to passivation treatment or in pools of sodium that were too deep for complete penetration of the passivation treatment. The EBR-II reactor was permitted by the Idaho Department of Environmental Quality (DEQ) in 2002 under a RCRA permit that requires removal of all remaining sodium in the primary and secondary systems by 2022. The proposed baseline closure method would remove the large components from the primary tank, fill the primary system with water, react the remaining sodium with the water and dissolve the reaction products in the wash water. This method would generate a minimum of 100,000 gallons of caustic, liquid, low level radioactive, hazardous waste water that must be disposed of in a permitted facility. On February 19-20, 2008, a workshop was held in Idaho Falls, Idaho, to look at alternatives that could meet the RCRA permit clean closure requirements and minimize the quantity of hazardous waste generated by the cleanup process. The workshop convened a panel of national and international sodium cleanup specialists, subject matter experts from the INL, and the EBR-II Wash Water Project team that organized the workshop. The

  19. Results of readiness review for start of Title II Design of ESF in salt

    International Nuclear Information System (INIS)

    1986-01-01

    The Readiness Review Board recommends that the ESF Title II Design be initiated after approval of revised Functional Design Criteria for Title II design. This review was conducted assuming a Deaf Smith location for ESF. Seventy-four open items and eight technical holds were identified during the Readiness Review that must be addressed and resolved to ensure successful completion of the ESF Title II Design. These items include definition and approval of surface based, EDH, and subsurface testing requirements; development of an approved OCRWM/SRPO licensing position for the ESF; and acquisition and availability of site-specific confirmatory data. A Risk Assessment should be conducted to define corrective action data and technical, cost and schedule impacts and associated program risks of continuation of Title II design activities beyond those dates

  20. Computational design of binding proteins to EGFR domain II.

    Directory of Open Access Journals (Sweden)

    Yoon Sup Choi

    Full Text Available We developed a process to produce novel interactions between two previously unrelated proteins. This process selects protein scaffolds and designs protein interfaces that bind to a surface patch of interest on a target protein. Scaffolds with shapes complementary to the target surface patch were screened using an exhaustive computational search of the human proteome and optimized by directed evolution using phage display. This method was applied to successfully design scaffolds that bind to epidermal growth factor receptor (EGFR domain II, the interface of EGFR dimerization, with high reactivity toward the target surface patch of EGFR domain II. One potential application of these tailor-made protein interactions is the development of therapeutic agents against specific protein targets.

  1. An Alternative View of Some FIA Sample Design and Analysis Issues

    Science.gov (United States)

    Paul C. Van Deusen

    2005-01-01

    Sample design and analysis decisions are the result of compromises and inputs from many sources. The end result would likely change if different individuals or groups were involved in the planning process. Discussed here are some alternatives to the procedures that are currently being used for the annual inventory. The purpose is to indicate that alternatives exist and...

  2. Providing training enhances the biomechanical improvements of an alternative computer mouse design

    NARCIS (Netherlands)

    Houwink, A.; Oude Hengel, K.M.; Odell, D.; Dennerlein, J.T.

    2009-01-01

    To determine if an alternative mouse promotes more neutral postures and decreases forearm muscle activity and if training enhances these biomechanical benefits is the purpose of the study. Computer mouse use is a risk factor for developing musculoskeletal disorders; alternative mouse designs can

  3. LWR design decision methodology: Phase II. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1981-01-01

    Techniques were identified to augment existing design process at the component and system level in order to optimize cost and safety between alternative system designs. The method was demonstrated using the Surry Low Pressure Injection System (LPIS). Three possible backfit options were analyzed for the Surry LPIS, assessing the safety level of each option and estimating the acquisition and installation costs for each. (DLC)

  4. Alternate design concept for the SSC dipole magnet cryogenic support post

    International Nuclear Information System (INIS)

    Lipski, A.; Nicol, T.H.; Richardson, R.

    1991-03-01

    New materials and developments in the field of advanced composites have created the opportunity to take a fresh look into the design of the cryogenic supports for SSC collider dipole cryostats. Although the present reentrant post design meets the structural and thermal requirements, its assembly requires precision and proficiency. The objective of the proposed alternate concept is to reduce the overall cost of the support post by means of simplifying and optimizing its component design and assembly process. The present shrink fitted tube assembly may potentially be replaced by injection molded parts. New resin systems with lower thermal conductivity and high strength properties enable the utilization of automated production techniques such as injection molding and filament winding. This paper will provide analysis and design information for the alternate support post concept and compare its test performance and cost to the present support post. 3 refs., 12 figs., 4 tabs

  5. Cell and stack design alternatives. Final report, August 1, 1978-December 31, 1979

    Energy Technology Data Exchange (ETDEWEB)

    Hoover, Jr., D. Q.; King, Robert B.

    1980-02-01

    The work described comprised the first phase of a planned six phase program to develop commercially viable phosphoric acid fuel cell (PAFC) driven on-site integrated energy systems (OS/IES). The Phase I effort was organized as three major technical tasks; (1) study of system design alternatives; (2) fuel cell design alternatives; and (3) methane conditioner study. It was decided that comprehensive modeling of one application would most effectively utilize the resources available for the study of systems design alternatives. A 48 unit apartment complex located in Albany, New York and built to HUD minimum standards was selected as being typical of the applications that will be served by the systems. The time varying space conditioning (HVAC) and electrical requirements including the effects of varying weather conditions, living habits and occupancy patterns were modeled. These requirements formed the basis for comparing the performance and cost of the alternative configurations with each other and with a conventional system. Five basic alternative OS/IES configurations plus four variations were selected from a preliminary list of 13 basic configurations for detailed performance nd cost evaluations. Study procedures and results are presented in detail. (WHK)

  6. Arizona Public Service - Alternative Fuel (Hydrogen) Pilot Plant Design Report

    Energy Technology Data Exchange (ETDEWEB)

    James E. Francfort

    2003-12-01

    Hydrogen has promise to be the fuel of the future. Its use as a chemical reagent and as a rocket propellant has grown to over eight million metric tons per year in the United States. Although use of hydrogen is abundant, it has not been used extensively as a transportation fuel. To assess the viability of hydrogen as a transportation fuel and the viability of producing hydrogen using off-peak electric energy, Pinnacle West Capital Corporation (PNW) and its electric utility subsidiary, Arizona Public Service (APS) designed, constructed, and operates a hydrogen and compressed natural gas fueling station—the APS Alternative Fuel Pilot Plant. This report summarizes the design of the APS Alternative Fuel Pilot Plant and presents lessons learned from its design and construction. Electric Transportation Applications prepared this report under contract to the U.S. Department of Energy’s Advanced Vehicle Testing Activity. The Idaho National Engineering and Environmental Laboratory manages these activities for the Advanced Vehicle Testing Activity.

  7. Willow Park II Community Center. Design report for the passive solar commercial buildings design assistance and demonstration program

    Energy Technology Data Exchange (ETDEWEB)

    None

    1981-01-15

    The design process for a passive solar community center in Texas is documented. Weather data are given. Energy analysis for early drawings is performed using the ENERGYLOOK program and the results shown graphically. Energy consumption and cost data are given. The design evolution is then traced and the performance of alternative designs compared. Design indicators for best strategies and concepts are discussed and the final design is presented. Energy consumption and cost are given, along with incremental passive solar design costs. A schematic review meeting report and life cycle value tables are included. Overviews, unavailable information, incremental passive design costs, performance comparison of alternatives, and architectural compatibility are discussed for each step in the design process. (LEW)

  8. Belle II Technical Design Report

    CERN Document Server

    Abe, T; Adamczyk, K; Ahn, S; Aihara, H; Akai, K; Aloi, M; Andricek, L; Aoki, K; Arai, Y; Arefiev, A; Arinstein, K; Arita, Y; Asner, D M; Aulchenko, V; Aushev, T; Aziz, T; Bakich, A M; Balagura, V; Ban, Y; Barberio, E; Barvich, T; Belous, K; Bergauer, T; Bhardwaj, V; Bhuyan, B; Blyth, S; Bondar, A; Bonvicini, G; Bozek, A; Bracko, M; Brodzicka, J; Brovchenko, O; Browder, T E; Cao, G; Chang, M -C; Chang, P; Chao, Y; Chekelian, V; Chen, A; Chen, K -F; Chen, P; Cheon, B G; Chiang, C -C; Chistov, R; Cho, K; Choi, S -K; Chung, K; Comerma, A; Cooney, M; Cowley, D E; Critchlow, T; Dalseno, J; Danilov, M; Dieguez, A; Dierlamm, A; Dillon, M; Dingfelder, J; Dolenec, R; Dolezal, Z; Drasal, Z; Drutskoy, A; Dungel, W; Dutta, D; Eidelman, S; Enomoto, A; Epifanov, D; Esen, S; Fast, J E; Feindt, M; Garcia, M Fernandez; Fifield, T; Fischer, P; Flanagan, J; Fourletov, S; Fourletova, J; Freixas, L; Frey, A; Friedl, M; Fruehwirth, R; Fujii, H; Fujikawa, M; Fukuma, Y; Funakoshi, Y; Furukawa, K; Fuster, J; Gabyshev, N; Cueto, A Gaspar de Valenzuela; Garmash, A; Garrido, L; Geisler, Ch; Gfall, I; Goh, Y M; Golob, B; Gorton, I; Grzymkowski, R; Guo, H; Ha, H; Haba, J; Hara, K; Hara, T; Haruyama, T; Hayasaka, K; Hayashi, K; Hayashii, H; Heck, M; Heindl, S; Heller, C; Hemperek, T; Higuchi, T; Horii, Y; Hou, W -S; Hsiung, Y B; Huang, C -H; Hwang, S; Hyun, H J; Igarashi, Y; Iglesias, C; Iida, Y; Iijima, T; Imamura, M; Inami, K; Irmler, C; Ishizuka, M; Itagaki, K; Itoh, R; Iwabuchi, M; Iwai, G; Iwai, M; Iwasaki, M; Iwasaki, M; Iwasaki, Y; Iwashita, T; Iwata, S; Jang, H; Ji, X; Jinno, T; Jones, M; Julius, T; Kageyama, T; Kah, D H; Kakuno, H; Kamitani, T; Kanazawa, K; Kapusta, P; Kataoka, S U; Katayama, N; Kawai, M; Kawai, Y; Kawasaki, T; Kennedy, J; Kichimi, H; Kikuchi, M; Kiesling, C; Kim, B K; Kim, G N; Kim, H J; Kim, H O; Kim, J -B; Kim, J H; Kim, M J; Kim, S K; Kim, K T; Kim, T Y; Kinoshita, K; Kishi, K; Kisielewski, B; van Dam, K Kleese; Knopf, J; Ko, B R; Koch, M; Kodys, P; Koffmane, C; Koga, Y; Kohriki, T; Koike, S; Koiso, H; Kondo, Y; Korpar, S; Kouzes, R T; Kreidl, Ch; Kreps, M; Krizan, P; Krokovny, P; Krueger, H; Kruth, A; Kuhn, W; Kuhr, T; Kumar, R; Kumita, T; Kupper, S; Kuzmin, A; Kvasnicka, P; Kwon, Y -J; Lacasta, C; Lange, J S; Lee, I -S; Lee, M J; Lee, M W; Lee, S -H; Lemarenko, M; Li, J; Li, W D; Li, Y; Libby, J; Limosani, A; Liu, C; Liu, H; Liu, Y; Liu, Z; Liventsev, D; Virto, A Lopez; Makida, Y; Mao, Z P; Marinas, C; Masuzawa, M; Matvienko, D; Mitaroff, W; Miyabayashi, K; Miyata, H; Miyazaki, Y; Miyoshi, T; Mizuk, R; Mohanty, G B; Mohapatra, D; Moll, A; Mori, T; Morita, A; Morita, Y; Moser, H -G; Martin, D Moya; Mueller, T; Muenchow, D; Murakami, J; Myung, S S; Nagamine, T; Nakamura, I; Nakamura, T T; Nakano, E; Nakano, H; Nakao, M; Nakazawa, H; Nam, S -H; Natkaniec, Z; Nedelkovska, E; Negishi, K; Neubauer, S; Ng, C; Ninkovic, J; Nishida, S; Nishimura, K; Novikov, E; Nozaki, T; Ogawa, S; Ohmi, K; Ohnishi, Y; Ohshima, T; Ohuchi, N; Oide, K; Olsen, S L; Ono, M; Ono, Y; Onuki, Y; Ostrowicz, W; Ozaki, H; Pakhlov, P; Pakhlova, G; Palka, H; Park, H; Park, H K; Peak, L S; Peng, T; Peric, I; Pernicka, M; Pestotnik, R; Petric, M; Piilonen, L E; Poluektov, A; Prim, M; Prothmann, K; Regimbal, K; Reisert, B; Richter, R H; Riera-Babures, J; Ritter, A; Ritter, A; Ritter, M; Roehrken, M; Rorie, J; Rosen, M; Rozanska, M; Ruckman, L; Rummel, S; Rusinov, V; Russell, R M; Ryu, S; Sahoo, H; Sakai, K; Sakai, Y; Santelj, L; Sasaki, T; Sato, N; Sato, Y; Scheirich, J; Schieck, J; Schwanda, C; Schwartz, A J; Schwenker, B; Seljak, A; Senyo, K; Seon, O -S; Sevior, M E; Shapkin, M; Shebalin, V; Shen, C P; Shibuya, H; Shiizuka, S; Shiu, J -G; Shwartz, B; Simon, F; Simonis, H J; Singh, J B; Sinha, R; Sitarz, M; Smerkol, P; Sokolov, A; Solovieva, E; Stanic, S; Staric, M; Stypula, J; Suetsugu, Y; Sugihara, S; Sugimura, T; Sumisawa, K; Sumiyoshi, T; Suzuki, K; Suzuki, S Y; Takagaki, H; Takasaki, F; Takeichi, H; Takubo, Y; Tanaka, M; Tanaka, S; Taniguchi, N; Tarkovsky, E; Tatishvili, G; Tawada, M; Taylor, G N; Teramoto, Y; Tikhomirov, I; Trabelsi, K; Tsuboyama, T; Tsunada, K; Tu, Y -C; Uchida, T; Uehara, S; Ueno, K; Uglov, T; Unno, Y; Uno, S; Urquijo, P; Ushiroda, Y; Usov, Y; Vahsen, S; Valentan, M; Vanhoefer, P; Varner, G; Varvell, K E; Vazquez, P; Vila, I; Vilella, E; Vinokurova, A; Visniakov, J; Vos, M; Wang, C H; Wang, J; Wang, M -Z; Wang, P; Wassatch, A; Watanabe, M; Watase, Y; Weiler, T; Wermes, N; Wescott, R E; White, E; Wicht, J; Widhalm, L; Williams, K M; Won, E; Xu, H; Yabsley, B D; Yamamoto, H; Yamaoka, H; Yamaoka, Y; Yamauchi, M; Yin, Y; Yoon, H; Yu, J; Yuan, C Z; Yusa, Y; Zander, D; Zdybal, M; Zhang, Z P; Zhao, J; Zhao, L; Zhao, Z; Zhilich, V; Zhou, P; Zhulanov, V; Zivko, T; Zupanc, A; Zyukova, O

    2010-01-01

    The Belle detector at the KEKB electron-positron collider has collected almost 1 billion Y(4S) events in its decade of operation. Super-KEKB, an upgrade of KEKB is under construction, to increase the luminosity by two orders of magnitude during a three-year shutdown, with an ultimate goal of 8E35 /cm^2 /s luminosity. To exploit the increased luminosity, an upgrade of the Belle detector has been proposed. A new international collaboration Belle-II, is being formed. The Technical Design Report presents physics motivation, basic methods of the accelerator upgrade, as well as key improvements of the detector.

  9. Conceptual design of China fusion power plant FDS-II

    International Nuclear Information System (INIS)

    Wu, Y.; Liu, S.; Chen, H.

    2007-01-01

    As one of the series of fusion system design concepts developed by the FDS Team of China, FDS-II is designated to exploit and evaluate potential attractiveness of fusion energy application for the generation of electricity on the basis of conservatively advanced plasma parameters, which can be limitedly extrapolated from the successful operation of ITER. The principle of the blanket design is established in both the feasibility and potential attractiveness of technology to meet the requirement for tritium self-sufficiency, safety margin, operation economy and environment protection etc. The plasma physics and engineering parameters of FDS-II are selected on the basis of the progress in recent experiments and associated theoretical studies of magnetic confinement fusion plasma with a fusion power of 2∝3 GW. The neutron wall load of 2∝3 MW/m 2 and the surface heat flux of 0.5∝1 MW/m 2 are considered for high effective power conversion. The ''multi-modules'' scenario is adopted in the FDS-II blanket design to reduce thermal stress and electromagnetic forces under plasma disruption, with liquid metal lithium lead (LiPb) as tritium breeder, the Reduced Activation Ferritic/Martensitic (RAFM) steel as structural material. Two options of specific liquid LiPb blanket concepts have been proposed, named the Dual-cooled Lithium Lead (DLL) breeder blanket and the Quasi-Static Lithium Lead (SLL) breeder blanket. The DLL blanket is a dual-cooled LiPb breeder system with helium gas to cool the first wall and main structure and LiPb eutectic to be self-cooled. The flow channel inserts (FCIs), e.g. SiCf/SiC composites, are designed as the thermal and electrical insulators inside the LiPb flow channels to reduce the magnetohydrodynamic (MHD) pressure drop and to allow the coolant LiPb outlet temperature up to 700 C for high thermal efficiency. The SLL blanket is another option of the FDS-II blanket with the technology developed relatively easily. To avoid or mitigate the

  10. Vacuum system design for the PEP-II B Factory High-Energy Ring

    International Nuclear Information System (INIS)

    Perkins, C.; Bostic, D.; Daly, E.

    1994-06-01

    The design of the vacuum system for the PEP-II B Factory High-Energy Ring is reviewed. The thermal design and vacuum requirements are particularly challenging in PEP-II due to high stored beam currents up to 3.0 amps in 1658 bunches. The vacuum chambers for the HER arcs are fabricated by electron beam welding extruded copper sections up to 6 m long. Design of these chambers and the vacuum PumPing configuration is described with results from vacuum and thermal analyses

  11. Alternate form and placement of short lived reactor waste and associated fuel hardware for decommissioning of EBR-II

    Energy Technology Data Exchange (ETDEWEB)

    Planchon, H.P.; Singleterry, R.C. Jr.

    1995-12-01

    Upon the termination of EBR-II operation in 1994, the mission has progressed to decommissioning and waste cleanup of the facility. The simplest method to achieve this goal is to bury the raw fuel and activated steel in an approved burial ground or deep geologic repository. While this might be simple, it could be very expensive, consume much needed burial space for other materials, and leave large amounts of fissile easily available to future generations. Also, as with any operation, an associated risk to personnel and the public from the buried waste exists. To try and reduce these costs and risks, alternatives to burial are sought. One alternative explored here for EBR-II is to condition the fuel and store the fission products and steel either permanently or temporarily in the sealed primary boundary of the decommissioned reactor. The first problem is to identify which subassemblies are going to be conditioned and their current composition and decay time. The next problem is to identify the conditioning process and determine the composition and form of the waste streams. The volume, mass, heat, and curie load of the waste streams needs to be determined so a waste-assembly can be designed. The reactor vessel and internals need to be analyzed to determine if they can handle these loads. If permanent storage is the goal, then mechanisms for placing the waste-assembly in the reactor vessel and sealing the vessel are needed. If temporary storage is the goal, then mechanisms for waste-assembly placement and retrieval are needed. This paper answers the technical questions of volume, mass, heat, and curie loads while just addressing the other questions found in a safety analysis. The final conclusion will compare estimated risks from the burial option and this option.

  12. Switchable photosystem-II designer algae for photobiological hydrogen production

    Science.gov (United States)

    Lee, James Weifu

    2010-01-05

    A switchable photosystem-II designer algae for photobiological hydrogen production. The designer transgenic algae includes at least two transgenes for enhanced photobiological H.sub.2 production wherein a first transgene serves as a genetic switch that can controls photosystem II (PSII) oxygen evolution and a second transgene encodes for creation of free proton channels in the algal photosynthetic membrane. In one embodiment, the algae includes a DNA construct having polymerase chain reaction forward primer (302), a inducible promoter (304), a PSII-iRNA sequence (306), a terminator (308), and a PCR reverse primer (310). In other embodiments, the PSII-iRNA sequence (306) is replaced with a CF.sub.1-iRNA sequence (312), a streptomycin-production gene (314), a targeting sequence (316) followed by a proton-channel producing gene (318), or a PSII-producing gene (320). In one embodiment, a photo-bioreactor and gas-product separation and utilization system produce photobiological H.sub.2 from the switchable PSII designer alga.

  13. Design and verification of controllers for longitudinal oscillations using optimal control theory and numerical simulation: Predictions for PEP-II

    International Nuclear Information System (INIS)

    Hindi, H.; Prabhakar, S.; Fox, J.; Teytelman, D.

    1997-12-01

    The authors present a technique for the design and verification of efficient bunch-by-bunch controllers for damping longitudinal multibunch instabilities. The controllers attempt to optimize the use of available feedback amplifier power--one of the most expensive components of a feedback system--and define the limits of closed loop system performance. The design technique alternates between analytic computation of single bunch optimal controllers and verification on a multibunch numerical simulator. The simulator identifies unstable coupled bunch modes and predicts their growth and damping rates. The results from the simulator are shown to be in reasonable agreement with analytical calculations based on the single bunch model. The technique is then used to evaluate the performance of a variety of controllers proposed for PEP-II

  14. HYLIFE-II reactor chamber mechanical design: Update

    International Nuclear Information System (INIS)

    House, P.A.

    1992-01-01

    Mechanical design features of the reactor chamber for the HYLIFE-II inertial confinement fusion power plant are presented. A combination of oscillating and steady, molten salt streams (Li 2 BeF 4 ) are used for shielding and blast protection of the chamber walls. The system is designed for a 6 Hz repetition rate. Beam path clearing, between shots, is accomplished with the oscillating flow. The mechanism for generating the oscillating streams is described. A design configuration of the vessel wall allows adequate cooling and provides extra shielding to reduce thermal stresses to tolerable levels. The bottom portion of the reactor chamber is designed to minimize splash back of the high velocity (17 m/s) salt streams and also recover up to half of the dynamic head. Cost estimates for a 1 GW e and 2 GW e reactor chamber are presented

  15. Tritium system design for the mirror reactors FPD-I, FPD-II, and FPD-III

    International Nuclear Information System (INIS)

    Finn, P.A.

    1985-01-01

    The tritium system design for the Fusion Power Demonstration Reactor (FPD-I, II, and III) is described. The device operates at 25% availability. For FPD-II, an engineering mode using tritium neutral beams is part of the design

  16. Design and Implementation of an Embedded NIOS II System for JPEG2000 Tier II Encoding

    Directory of Open Access Journals (Sweden)

    John M. McNichols

    2013-01-01

    Full Text Available This paper presents a novel implementation of the JPEG2000 standard as a system on a chip (SoC. While most of the research in this field centers on acceleration of the EBCOT Tier I encoder, this work focuses on an embedded solution for EBCOT Tier II. Specifically, this paper proposes using an embedded softcore processor to perform Tier II processing as the back end of an encoding pipeline. The Altera NIOS II processor is chosen for the implementation and is coupled with existing embedded processing modules to realize a fully embedded JPEG2000 encoder. The design is synthesized on a Stratix IV FPGA and is shown to out perform other comparable SoC implementations by 39% in computation time.

  17. Alternate Reductant Cold Cap Evaluation Furnace Phase II Testing

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, F. C. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Stone, M. E. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Miller, D. H. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2014-09-03

    Savannah River Remediation (SRR) conducted a Systems Engineering Evaluation (SEE) to determine the optimum alternate reductant flowsheet for the Defense Waste Processing Facility (DWPF). Specifically, two proposed flowsheets (nitric–formic–glycolic and nitric–formic–sugar) were evaluated based upon results from preliminary testing. Comparison of the two flowsheets among evaluation criteria indicated a preference towards the nitric–formic–glycolic flowsheet. Further research and development of this flowsheet eliminated the formic acid, and as a result, the nitric–glycolic flowsheet was recommended for further testing. Based on the development of a roadmap for the nitric–glycolic acid flowsheet, Waste Solidification Engineering (WS-E) issued a Technical Task Request (TTR) to address flammability issues that may impact the implementation of this flowsheet. Melter testing was requested in order to define the DWPF flammability envelope for the nitric-glycolic acid flowsheet. The Savannah River National Laboratory (SRNL) Cold Cap Evaluation Furnace (CEF), a 1/12th scale DWPF melter, was selected by the SRR Alternate Reductant project team as the melter platform for this testing. The overall scope was divided into the following sub-tasks as discussed in the Task Technical and Quality Assurance Plan (TTQAP): Phase I - A nitric–formic acid flowsheet melter test (unbubbled) to baseline the CEF cold cap and vapor space data to the benchmark melter flammability models; Phase II - A nitric–glycolic acid flowsheet melter test (unbubbled and bubbled) to: Define new cold cap reactions and global kinetic parameters in support of the melter flammability model development; Quantify off-gas surging potential of the feed; Characterize off-gas condensate for complete organic and inorganic carbon species. After charging the CEF with cullet from Phase I CEF testing, the melter was slurry-fed with glycolic flowsheet based SB6-Frit 418 melter feed at 36% waste

  18. Conceptual design of the Topaz II anticriticality device

    International Nuclear Information System (INIS)

    Trujillo, D.; Bultman, D.; Potter, R.C.; Sanchez, L.; Skobelev, V.E.

    1993-01-01

    The Topaz II Flight Safety team requires that the hardware for the Rusian-built reactor be modified to ensure that the reactor remains subcritical in the event of an inadvertent accident in which the reactor is submersed in wet sand or water. In April 1993, the American Flight safety team chose the fuel-out anticriticality device as the baseline for the hardware design. We describe the initial stages of the hardware design; show how the mechanism works; and describe its function, the functional and operational requirements, and the difficult design problems encountered. Also described, are the initial interactions between the Russian and American design teams. Because the effort is to add an American modification to a Russian flight reactor, this project has required unusual technical cooperation and consultation with the Russian design team

  19. The Alternative Design Features for Safety Enhancement in Shutdown Operation

    International Nuclear Information System (INIS)

    Oh, Hae Cheol; Kim, Myung Ki; Chung, Bag Soon; Seo, Mi Ro

    2009-01-01

    PSA can be used to confirm that the new plant design is complied with the applicable safety goals, and to select among the alternate design options. A shutdown PSA provides insight for outage planning schedule, outage management practices, and design modifications. Considering the results of both LPSD PSA studies and operating experiences for low power and shutdown, the improvements can be proposed to reduce the high risk contribution. The improvements/enhancements during shutdown operation may be divided into categories such as hardware, administrative management, and operational procedure. This paper presents on an example how the risk related to an accidental situation can be reduced, focusing the hardware design changes for the newly designed NPPs

  20. Expert System Approach For Generating And Evaluating Engine Design Alternatives

    Science.gov (United States)

    Shen, Stewart N. T.; Chew, Meng-Sang; Issa, Ghassan F.

    1989-03-01

    Artificial intelligence is becoming an increasingly important subject of study for computer scientists, engineering designers, as well as professionals in other fields. Even though AI technology is a relatively new discipline, many of its concepts have already found practical applications. Expert systems, in particular, have made significant contributions to technologies in such fields as business, medicine, engineering design, chemistry, and particle physics. This paper describes an expert system developed to aid the mechanical designer with the preliminary design of variable-stroke internal-combustion engines. The expert system accomplished its task by generating and evaluating a large number of design alternatives represented in the form of graphs. Through the application of structural and design rules directly to the graphs, optimal and near optimal preliminary design configurations of engines are deduced.

  1. ABWR-II Core Design with Spectral Shift Rods for Operation with All Control Rods Withdrawn

    International Nuclear Information System (INIS)

    Moriwaki, Masanao; Aoyama, Motoo; Anegawa, Takafumi; Okada, Hiroyuki; Sakurada, Koichi; Tanabe, Akira

    2004-01-01

    An innovative reactor core concept applying spectral shift rods (SSRs) is proposed to improve the plant economy and the operability of the 1700-MW(electric) Advanced Boiling Water Reactor II (ABWR-II). The SSR is a new type of water rod in which a water level is naturally developed during operation and changed according to the coolant flow rate through the channel. By taking advantage of the large size of the ABWR-II bundle, the enhanced spectral shift operation by eight SSRs allows operation of the ABWR-II with all control rods withdrawn. In addition, the uranium-saving factor of 6 to 7% relative to the reference ABWR-II core with conventional water rods can be expected due to the greater effect of spectral shift. The combination of these advantages means the ABWR-II with SSRs should be an attractive alternative for the next-generation nuclear reactor

  2. The Unique Optical Design of the CTI-II Survey Telescope

    Science.gov (United States)

    Ackermann, Mark R.; McGraw, J. T.; MacFarlane, M.

    2006-12-01

    The CCD/Transit Instrument with Innovative Instrumentation (CTI-II) is being developed for precision ground-based astrometric and photometric astronomical observations. The 1.8m telescope will be stationary, near-zenith pointing and will feature a CCD-mosaic array operated in time-delay and integrate (TDI) mode to image a continuous strip of the sky in five bands. The heart of the telescope is a Nasmyth-like bent-Cassegrain optical system optimized to produce near diffraction-limited images with near zero distortion over a circular1.42 deg field. The optical design includes an f/2.2 parabolic ULE primary with no central hole salvaged from the original CTI telescope and adds the requisite hyperbolic secondary, a folding flat and a highly innovative all-spherical, five lens corrector which includes three plano surfaces. The reflective and refractive portions of the design have been optimized as individual but interdependent systems so that the same reflective system can be used with slightly different refractive correctors. At present, two nearly identical corrector designs are being evaluated, one fabricated from BK-7 glass and the other of fused silica. The five lens corrector consists of an air-spaced triplet separated from follow-on air-spaced doublet. Either design produces 0.25 arcsecond images at 83% encircled energy with a maximum of 0.0005% distortion. The innovative five lens corrector design has been applied to other current and planned Cassegrain, RC and super RC optical systems requiring correctors. The basic five lens approach always results in improved performance compared to the original designs. In some cases, the improvement in image quality is small but includes substantial reductions in distortion. In other cases, the improvement in image quality is substantial. Because the CTI-II corrector is designed for a parabolic primary, it might be especially useful for liquid mirror telescopes. We describe and discuss the CTI-II optical design with respect

  3. Tokamak experimental power reactor conceptual design. Volume II

    International Nuclear Information System (INIS)

    1976-08-01

    Volume II contains the following appendices: (1) summary of EPR design parameters, (2) impurity control, (3) plasma computational models, (4) structural support system, (5) materials considerations for the primary energy conversion system, (6) magnetics, (7) neutronics penetration analysis, (8) first wall stress analysis, (9) enrichment of isotopes of hydrogen by cryogenic distillation, and (10) noncircular plasma considerations

  4. Engineering Design of a Drift Tube for PEFP DTL II

    International Nuclear Information System (INIS)

    Kim, Yong Hwan; Kwon, Heok Jung; Kim, Kui Young; Kim, Han Sung; Seol, Keong Tae; Song, Young Gi; Jang, Ji Ho; Hong, In Seok; Choi, Hyun Mi; Han, Sang Hyo; Cho, Yong Sub

    2005-01-01

    As the second stage of the PEFP(Proton Engineering Frontier Project) whose final goal is to develop 100MeV, 20mA proton accelerator, Engineering design of the DTL(Drift Tube Linac) II is in proceeding. In this paper, the details of design of the DT(Drift Tube) and EQM(Electro-Quadrupole Magnet) will be reported

  5. Design and Measurement of the NSLS II Quadrupole Prototypes

    Energy Technology Data Exchange (ETDEWEB)

    Rehak,M.; Jain, A. K.; Skaritka, J.; Spataro, C.

    2009-05-04

    The design and measurement of the NSLS-II ring quadrupoles prototypes are presented. These magnets are part of a larger prototype program described in [1]. Advances in software, hardware, and manufacturing have led to some new level of insight in the quest for the perfect magnet design. Three geometric features are used to minimize the first three allowed harmonics by way of optimization. Validations through measurement and confidence levels in calculations are established.

  6. Process of establishing design requirements and selecting alternative configurations for conceptual design of a VLA

    Directory of Open Access Journals (Sweden)

    Bo-Young Bae

    2017-04-01

    Full Text Available In this study, a process for establishing design requirements and selecting alternative configurations for the conceptual phase of aircraft design has been proposed. The proposed process uses system-engineering-based requirement-analysis techniques such as objective tree, analytic hierarchy process, and quality function deployment to establish logical and quantitative standards. Moreover, in order to perform a logical selection of alternative aircraft configurations, it uses advanced decision-making methods such as morphological matrix and technique for order preference by similarity to the ideal solution. In addition, a preliminary sizing tool has been developed to check the feasibility of the established performance requirements and to evaluate the flight performance of the selected configurations. The present process has been applied for a two-seater very light aircraft (VLA, resulting in a set of tentative design requirements and two families of VLA configurations: a high-wing configuration and a low-wing configuration. The resulting set of design requirements consists of three categories: customer requirements, certification requirements, and performance requirements. The performance requirements include two mission requirements for the flight range and the endurance by reflecting the customer requirements. The flight performances of the two configuration families were evaluated using the sizing tool developed and the low-wing configuration with conventional tails was selected as the best baseline configuration for the VLA.

  7. CONCEPTUAL DESIGN OF THE NSLS-II INJECTION SYSTEM.

    Energy Technology Data Exchange (ETDEWEB)

    SHAFTAN,T.; ROSE, T.; PINAYEV, I.; HEESE, R.; BENGTSSON, J.; SKARITKA, J.; MENG, W.; OZAKI, S.; MEIER, R.; STELMACH, C.; LITVINENKO, V.; PJEROV, S.; SHARMA, S.; GANETIS, G.; HSEUH, H.C.; JOHNSON, E.D.; TSOUPAS, N.; GUO, W.; BEEBE-WANG, J.; LUCCIO, A.U.; YU, L.H.; RAPARIA, D.; WANG, D.

    2007-06-25

    We present the conceptual design of the NSLS-II injection system [1,2]. The injection system consists of a low-energy linac, booster and transport lines. We review two different injection system configurations; a booster located in the storage ring tunnel and a booster housed in a separate building. We briefly discuss main parameters and layout of the injection system components.

  8. TIBER-II TF [toroidal-field] winding pack design

    International Nuclear Information System (INIS)

    Kerns, J.A.; Miller, J.R.; Slack, D.S.; Summers, L.T.

    1987-01-01

    The superconducting, toroidal-field (TF) coils in the Tokamak Ignition/Burn Engineering Reactor (TIBER II) are designed with cable-in-conduit conductor (CICC) using Nb 3 Sn composite strands. To design the CICC winding pack, we used an optimization technique that maximizes the conductor stability without violating the constraints imposed by the structure, electrical insulation, quench protection, and fabrication technique. Detailed helium-properties codes calculate the heat removal along a flow path, and detailed field calculations determine the temperature, current, and stability margins. The conductor sheath is designed as distributed structure to partially support the combined in-plane and out-of-plane loads generated within the winding pack. Pancakes of the coil are wound, reacted, and insulated before being potted in the case. This design is aggressive but fully consistent with good engineering practice. 5 refs., 4 figs., 2 tabs

  9. An alternative method for determination of oscillator strengths: The example of Sc II

    International Nuclear Information System (INIS)

    Ruczkowski, J.; Elantkowska, M.; Dembczyński, J.

    2014-01-01

    We describe our method for determining oscillator strengths and hyperfine structure splittings that is an alternative to the commonly used, purely theoretical calculations, or to the semi-empirical approach combined with theoretically calculated transition integrals. We have developed our own computer programs that allow us to determine all attributes of the structure of complex atoms starting from the measured frequencies emitted by the atoms. As an example, we present the results of the calculation of the structure, electric dipole transitions, and hyperfine splittings of Sc II. The angular coefficients of the transition matrix in pure SL coupling were found from straightforward Racah algebra. The transition matrix was transformed into the actual intermediate coupling by the fine structure eigenvectors obtained from the semi-empirical approach. The transition integrals were treated as free parameters in the least squares fit to experimental gf values. For most transitions, the experimental and the calculated gf-values are consistent with the accuracy claimed in the NIST compilation. - Highlights: • The method of simultaneous determination of all the attributes of atomic structure. • The semi-empirical method of parameterization of oscillator strengths. • Illustration of the method application for the example of Sc II data

  10. Safety Evaluation Report related to the final design approval of the GESSAR II BWR/6 Nuclear Island design, Docket No. 50-447

    International Nuclear Information System (INIS)

    1983-04-01

    The Safety Evaluation Report for the application filed by General Electric Company for the Final Design Approval for the General Electric Standard Safety Analysis Report (GESSAR II FSAR) has been prepared by the Office of Nuclear Reactor Regulation of the Nuclear Regulatory Commission. This report summarizes the results of the staff's safety review of the GESSAR II BWR/6 Nuclear Island Design. Subject to favorable resolution of items discussed in the Safety Evaluation Report, the staff concludes that the facilities referencing GESSAR II, subject to approval of the balance-of-plant design, can conform with the provisions of the Act and the regulations of the Nuclear Regulatory Commission

  11. Alternative Education: A Comparative Case Study of the Behavior Modification Programs of Two Upstate South Carolina Alternative Schools for Youth Who Exhibit Behavior That Is Disruptive

    Science.gov (United States)

    Scipio, Timothy Lamont

    2013-01-01

    This study examined behavior modification programs in schools designed to focus on discipline and that aim to reform disruptive behavior in students, usually over a limited period of time. This was a comparative case study of two type II alternative schools in the Upstate of South Carolina. The findings contributed to the research base regarding…

  12. DESIGN OF ALTERNATIVE ENERGY SOURCES

    Directory of Open Access Journals (Sweden)

    Popa Stefania

    2013-11-01

    Full Text Available By energy sources we understand technologies and materials used to obtain various forms of energy necessary for the development of society. These sources must be in adequate quantities and be conveniently exploited in terms of technical, economic and sustainable perspective. Alternative energy uses the inherent power of natural sources like wind, tides, the sun. Alternative energy is a term used for some energy sources and energy storage technologies. Generally it indicates energies that are nontraditional and have low impact to the environment. The alternative energy term is used in contrast with the term fossil fuel according to some sources, while other sources use it with the meaning of renewable energy purposes.

  13. Detailed design, fabrication and testing of an engineering prototype compensated pulsed alternator. Final report

    International Nuclear Information System (INIS)

    Bird, W.L. Jr.; Woodson, H.H.

    1980-03-01

    The design, fabrication, and test results of a prototype compensated pulsed alternator are discussed. The prototype compulsator is a vertical shaft single phase alternator with a rotating armature and salient pole stator. The machine is designed for low rep rate pulsed duty and is sized to drive a modified 10 cm Beta amplifier. The load consists of sixteen 15 mm x 20 mm x 112 cm long xenon flashlamps connected in parallel. The prototype compulsator generates an open circuit voltage of 6 kV, 180 Hz, at a maximum design speed of 5400 rpm. At maximum speed, the inertial energy stored in the compulsator rotor is 3.4 megajoules

  14. Statistical inference for extended or shortened phase II studies based on Simon's two-stage designs.

    Science.gov (United States)

    Zhao, Junjun; Yu, Menggang; Feng, Xi-Ping

    2015-06-07

    Simon's two-stage designs are popular choices for conducting phase II clinical trials, especially in the oncology trials to reduce the number of patients placed on ineffective experimental therapies. Recently Koyama and Chen (2008) discussed how to conduct proper inference for such studies because they found that inference procedures used with Simon's designs almost always ignore the actual sampling plan used. In particular, they proposed an inference method for studies when the actual second stage sample sizes differ from planned ones. We consider an alternative inference method based on likelihood ratio. In particular, we order permissible sample paths under Simon's two-stage designs using their corresponding conditional likelihood. In this way, we can calculate p-values using the common definition: the probability of obtaining a test statistic value at least as extreme as that observed under the null hypothesis. In addition to providing inference for a couple of scenarios where Koyama and Chen's method can be difficult to apply, the resulting estimate based on our method appears to have certain advantage in terms of inference properties in many numerical simulations. It generally led to smaller biases and narrower confidence intervals while maintaining similar coverages. We also illustrated the two methods in a real data setting. Inference procedures used with Simon's designs almost always ignore the actual sampling plan. Reported P-values, point estimates and confidence intervals for the response rate are not usually adjusted for the design's adaptiveness. Proper statistical inference procedures should be used.

  15. TWTF design alternates

    International Nuclear Information System (INIS)

    Ayers, A.L. Sr.

    1982-03-01

    The Transuranic Waste Treatment Facility (TWTF) will process transuranic (TRU) waste in retrievable storage at the Idaho National Engineering Laboratory (INEL). The costs for a TWTF concept using a slagging pyrolysis incinerator were excessive. Alternate concepts using a slow speed shredder, a rotary kiln incinerator, and concrete immobilization should result in significant cost reductions. These will be included in future TWTF considerations

  16. DNA damage regulates alternative splicing through changes in POL II elongation

    International Nuclear Information System (INIS)

    Munoz, M.J.; Perez Santangelo, M.S.; De la Mata, M.; Kornblihtt, A.R.

    2008-01-01

    Many apoptotic genes are regulated via alternative splicing (AS) but little is known about the mechanisms controlling AS in stress situations derived from DNA damage. Here we show that ultraviolet (UV) radiation affects co-transcriptional, but not post transcriptional, AS through a systemic mechanism involving a CDK-9-dependent hyper phosphorylation of RNA polymerase II carboxy terminal domain (CTD) and a subsequent and unprecedented inhibition of transcriptional elongation, estimated in vivo and in real time by FRAP. To mimic this hyper phosphorylation we used CTD mutants with serines 2 or 5 substituted by glutamic acids and found that they not only display lower elongation rates but duplicate the effects of UV light on AS in the absence of irradiation. Consistently, substitution of the serines with alanines prevents the UV effect on splicing. These results represent the first in vivo proof of modulation of elongation in response to an environmental signal, affecting in turn the kinetic coupling between transcription and splicing. (authors)

  17. Potential use of California lignite and other alternate fuel for enhanced oil recovery. Phase I and II. Final report. [As alternative fuels for steam generation in thermal EOR

    Energy Technology Data Exchange (ETDEWEB)

    Shelton, R.; Shimizu, A.; Briggs, A.

    1980-02-01

    The Nation's continued reliance on liquid fossil fuels and decreasing reserves of light oils gives increased impetus to improving the recovery of heavy oil. Thermal enhanced oil recovery EOR techniques, such as steam injection, have generally been the most effective for increasing heavy oil production. However, conventional steam generation consumes a large fraction of the produced oil. The substitution of alternate (solid) fuels would release much of this consumed oil to market. This two-part report focuses on two solid fuels available in California, the site of most thermal EOR - petroleum coke and lignite. Phase I, entitled Economic Analysis, shows detailed cost comparisons between the two candidate fuels and also with Western coal. The analysis includes fuels characterizations, process designs for several combustion systems, and a thorough evaluation of the technical and economic uncertainties. In Phase II, many technical parameters of petroleum coke combustion were measured in a pilot-plant fluidized bed. The results of the study showed that petroleum coke combustion for EOR is feasible and cost effective in a fluidized bed combustor.

  18. Alternatives generation and analysis for phase I intermediate waste feed staging system design requirements

    Energy Technology Data Exchange (ETDEWEB)

    Britton, M.D.

    1996-10-02

    This document provides; a decision analysis summary; problem statement; constraints, requirements, and assumptions; decision criteria; intermediate waste feed staging system options and alternatives generation and screening; intermediate waste feed staging system design concepts; intermediate waste feed staging system alternative evaluation and analysis; and open issues and actions.

  19. Ocean Thermal Energy Conservation (OTEC) power system development (PDS) II. Preliminary design report

    Energy Technology Data Exchange (ETDEWEB)

    1979-08-10

    This report documents the results and conclusions of the PDS II, Phase I, preliminary design of a 10 MWe OTEC power system, using enhanced plate type heat exchangers, and of representative 0.2 MWe test articles. It further provides the documentation (specifications, drawings, trade studies, etc.) resulting from the design activities. The data and discussions of the technical concepts are organized to respond to the PDS II, Phase II proposal evaluation criteria. This volume, which specifically addresses the three evaluation categories (heat exchangers, rotating machinery, and power system configuration and performance) is an integral part of the Phase II plans (proposal) which describe the technical approach to delivering test articles to OTEC-1. In addition, there is a section which addresses power system cost and net energy analysis and another which discusses the results of stainless steel feasibility studies. Supporting documentation is contained in two appendix volumes.

  20. Predicting the effectiveness of road safety campaigns through alternative research designs.

    Science.gov (United States)

    Adamos, Giannis; Nathanail, Eftihia

    2016-12-01

    A large number of road safety communication campaigns have been designed and implemented in the recent years; however their explicit impact on driving behavior and road accident rates has been estimated in a rather low proportion. Based on the findings of the evaluation of three road safety communication campaigns addressing the issues of drinking and driving, seat belt usage, and driving fatigue, this paper applies different types of research designs (i.e., experimental, quasi-experimental, and non-experimental designs), when estimating the effectiveness of road safety campaigns, implements a cross-design assessment, and conducts a cross-campaign evaluation. An integrated evaluation plan was developed, taking into account the structure of evaluation questions, the definition of measurable variables, the separation of the target audience into intervention (exposed to the campaign) and control (not exposed to the campaign) groups, the selection of alternative research designs, and the appropriate data collection methods and techniques. Evaluating the implementation of different research designs in estimating the effectiveness of road safety campaigns, results showed that the separate pre-post samples design demonstrated better predictability than other designs, especially in data obtained from the intervention group after the realization of the campaign. The more constructs that were added to the independent variables, the higher the values of the predictability were. The construct that most affects behavior is intention, whereas the rest of the constructs have a lower impact on behavior. This is particularly significant in the Health Belief Model (HBM). On the other hand, behavioral beliefs, normative beliefs, and descriptive norms, are significant parameters for predicting intention according to the Theory of Planned Behavior (TPB). The theoretical and applied implications of alternative research designs and their applicability in the evaluation of road safety

  1. The nuclear data collecting system designed with ARM and μC/OS-II

    International Nuclear Information System (INIS)

    Wang Chunsheng; Ma Yingjie; Han Feng

    2008-01-01

    Introduce a kind of nuclear data collecting system regarding ARM-μC/OS-II as the platform, gathering the GPS receiver in it. It was detailed to expatiated the key techniques of the multi-channel pulse amplitude analyzer, the interface design of LPC2148, a controller in ARM, and how to expand the RTOS and design applications on μC/OS-II. This system can communicate with the GPS-OEM module by the UART interface, collecting the GPS information synchronously as well as nuclear data. And then save and display them or pass them to the host computer by the USB interface. The embedded and Real-Time system, μC/OS-II build up the real-time and stability of the system and advance the integration. (authors)

  2. TIBER II/ETR final design report: Volume 2, 3.0 Engineering

    International Nuclear Information System (INIS)

    Lee, J.D.

    1987-09-01

    This paper discusses the design of the TIBER II Tokamak. This particular volume discusses: mechanical systems; electrical systems; shield nuclear analysis and tritium issues; reactor building facilities; and tritium systems

  3. Research of CITP-II tritium production irradiation device design

    International Nuclear Information System (INIS)

    Zhang Zhihua; Deng Yongjun; Mi Xiangmiao; Li Rundong; Liu Zhiyong

    2012-01-01

    As the core component of CITP-II, the online tritium production irradiation device is the pivotal equipment in the research on tritium production and release of tritium breeders. The design of CITP-II online tritium production irradiation device creatively makes replacing the breeders online come true; as tritium production capacity, the self-shielding factor of device, and neutron flux were studied. The influence of different load models and load thicknesses of breeders to tritium production capacity was calculated. The hydrodynamics parameters of device in solid-gas phase were computed. Thermal parameters, such as the heat power of breeders, hotspot, temperature grads distributions, utmost temperature, uneven factors, were analyzed. Creatively designed nonlinear electric heater equalized breeders' even heat power. The influence laws of the components, pressure of gap gas and carrier gas to the balance temperature were got. And the key thermal parameters were ascertained. The key thermal parameters and the changing laws were got and provide the basis for structural optimization and safety analysis. They can also be referenced for the study of breeders' tritium production and release. (authors)

  4. AUTOMOTIVE DIESEL MAINTENANCE 1. UNIT XXX, I--CATERPILLAR DIESEL ENGINE MAINTENANCE SUMMARY, II--REIEWING FACTS ABOUT ALTERNATORS.

    Science.gov (United States)

    Minnesota State Dept. of Education, St. Paul. Div. of Vocational and Technical Education.

    THIS MODULE OF A 30-MODULE COURSE IS DESIGNED TO PROVIDE A SUMMARY OF DIESEL ENGINE MAINTENANCE FACTORS AND A REVIEW OF DIESEL ENGINE ALTERNATOR OPERATION. THE SEVEN SECTIONS COVER DIESEL ENGINE TROUBLESHOOTING AND THE OPERATION, TESTING, AND ADJUSTING OF ALTERNATORS. THE MODULE CONSISTS OF A SELF-INSTRUCTIONAL BRANCH PROGRAMED TRAINING FILM…

  5. A FASTBUS flash ADC system for the Mark II vertex chamber

    International Nuclear Information System (INIS)

    Barker, L.

    1988-10-01

    This is a description of a flash ADC system built for the Mark II experiment at the Stanford Linear Accelerator Center (SLAC). This system was designed for use in the experiment's vertex chamber where signals could occur over a relatively long time, approximately 10 microseconds. This long time, coupled with fast cable amplifiers, necessitated an alternate design approach than was used with a dE/dX FASTBUS flash ADC design. 1 ref., 6 figs

  6. PEP-II asymmetric B Factory: Design update and R ampersand D results

    International Nuclear Information System (INIS)

    Zisman, M.S.; Bell, R.A.; Dorfan, J.; Schwarz, H.; Barletta, W.A.; Calderon, M.

    1992-07-01

    PEP-II, a 9 GeV x 3.1 GeV e + e - collider with a design luminosity of 3 x 10 33 cm -2 s -1 , was proposed jointly by SLAC, LBL, and LLNL. Recent efforts have continued towards an optimized design. In addition, an aggressive R ampersand D program is under way to validate our design choices. Fabrication of a low-power prototype RF cavity is complete, and impedance measurements are beginning. A 500-kW, 476-MHz klystron has been completed; it will be used for testing both high-power RF windows and a prototype high-power cavity (now under design in collaboration with Chalk River Laboratory). Vacuum studies have demonstrated that chambers with suitable photodesorption properties can be fabricated. A mockup of the two-ring arc area has been completed and used to investigate alignment and stability issues. The PEP-II project is ready to begin construction as soon as funds become available

  7. Single-Case Research Design: An Alternative Strategy for Evidence-Based Practice

    Science.gov (United States)

    Stapleton, Drue; Hawkins, Andrew

    2015-01-01

    Objective: The trend of utilizing evidence-based practice (EBP) in athletic training is now requiring clinicians, researchers, educators, and students to be equipped to both engage in and make judgments about research evidence. Single-case design (SCD) research may provide an alternative approach to develop such skills and inform clinical and…

  8. Safety Evaluation Report related to the final design approval of the GESSAR II BWR/6 Nuclear Island Design (Docket No. 50-447). Supplement No. 3

    International Nuclear Information System (INIS)

    1985-01-01

    Supplement 3 to the Safety Evaluation Report (SER) for the application filed by General Electric Company for the final design approval for the GE BWR/6 nuclear island design has been prepared by the Office of Nuclear Reactor Regulation of the Nuclear Regulatory Commission. This report supplements the GESSAR II SER (NUREG-0979), issued in April 1983, summarizing the results of the staff's safety review of the GESSAR II BWR/6 nuclear island design. Subject to favorable resolution of the items discussed in this supplement, the staff concludes that the GESSAR II design satisfactorily addresses the severe-accident concerns described in draft NUREG-1070

  9. Structural optimization of an alternate design for the Space Shuttle solid rocket booster field joint

    Science.gov (United States)

    Barthelemy, Jean-Francois M.; Rogers, James L., Jr.; Chang, Kwan J.

    1987-01-01

    A structural optimization procedure is used to determine the shape of an alternate design for the Shuttle's solid rocket booster field joint. In contrast to the tang and clevis design of the existing joint, this alternate design consists of two flanges bolted together. Configurations with 150 studs of 1 1/8 in diameter and 135 studs of 1 3/16 in diameter are considered. Using a nonlinear programming procedure, the joint weight is minimized under constraints on either von Mises or maximum normal stresses, joint opening and geometry. The procedure solves the design problem by replacing it by a sequence of approximate (convex) subproblems; the pattern of contact between the joint halves is determined every few cycles by a nonlinear displacement analysis. The minimum weight design has 135 studs of 1 3/16 in diameter and is designed under constraints on normal stresses. It weighs 1144 lb per joint more than the current tang and clevis design.

  10. Reference design (MK-I and MK-II) for experimental multi-purpose VHTR

    International Nuclear Information System (INIS)

    Miyamoto, Yoshiaki; Suzuki, Kunihiko; Sato, Sadao

    1975-10-01

    This report summarizes the results of a study on thermal and mechanical performances of the core, which are obtained in course of reference design (Mk-I and Mk-II) for the experimental multi-purpose VHTR: (1) Design criteria, design methods and design data. These bases are also discussed in order to refer in the case of proceeding a next design work. (2) The results of performance analysis such as the initial core and its prediction for the irradiated core. (auth.)

  11. Creating An Alternative Design for Asita Corporate Identity

    Directory of Open Access Journals (Sweden)

    Michelle Elise

    2015-10-01

    Full Text Available The objective of the study is to find the solution to the problem outlined, which is to create an alternative design for corporate identity of ASITA. ASITA is a non-profit organization to foster tours and travel agencies in Indonesia. The writer conducted interview to the ASITA Jakarta Chapter, which was appointed to represent ASITA in providing the data needed by the writer. The writer interviewed the advisor of the organization, which had once served as chairperson of ASITA. The result of the research is new corporate identity system of ASITA based on a concept that ASITA as an organization, serves as a compass that guides and assists in every direction. The writer found that corporate identity is an important element to define an organization as well as giving impact on its first impression. To create good corporate identity, several things such as elements of design, color, typography, etc need to be put into attention. 

  12. Safety and environmental aspects of the HYLIFE-II and ARIES fusion reactor designs

    International Nuclear Information System (INIS)

    Dolan, T.J.; Longhurst, G.R.; Herring, J.S.

    1993-01-01

    The HYLIFE-II inertial confinement fusion reactor design uses jets of Flibe molten salt to protect the blast chamber walls and to breed tritium. It has a low tritium inventory and effective tritium removal. The issue with this design is not one of safety but of economics. The ARIES reactor designs have safety concerns associated with fires. These reactors designs are described

  13. Torus II. Technical description of the design proposal

    International Nuclear Information System (INIS)

    Aymar, R.; Deck, C.; Deschamps, P.; Lafon, D.; Leloup, C.; Pariente, M.; Renaud, C.; Sledziewski, Z.; Torossian, A.

    1976-06-01

    A new Tokamak device, called TORUS II, is proposed to be built inside the EURATOM-CEA Association. This is a large machine: I=1.7MA; B=30kGs; R=1.8m; a=75cm, designed to be a successor to TFR and to follow the lines of research already initiated in the present TFR programme, i.e. on plasma heating, on impurities, on energy confinement and scaling laws, providing to JET a very efficient backing. This part of the report provides a technical description of the main components of the basic machine, according to the state of design reached in June 1976. Every subsystem whose assembly forms the basic machine is the subject of one section: vacuum vessel, toroidal field coils, poloidal field system, mechanical structures, monitoring, control and data acquisition, and power supplies. The first part in each section attempts to summarize the solution that was retained, pointing out the problems to be solved and the choice made. No contribution takes into account the problems of installation and buildings and the time schedule which is given is only concerned with the simplest solution. By way, contributions are given which show the state of development of the peripheral systems envisaged for TORUS II, mainly: additional heating, control of impurities and plasma diagnostics [fr

  14. Retrofitting a spent fuel pool spray system for alternative cooling as a strategy for beyond design basis events

    Energy Technology Data Exchange (ETDEWEB)

    Hartmann, Christoph; Vujic, Zoran [Westinghouse Electric Germany GmbH, Mannheim (Germany)

    2017-06-15

    Due to requirements for nuclear power plants to withstand beyond design basis accidents, including events such as happened in 2011 in the Fukushima Daiichi Nuclear Power Plant in Japan, alternative cooling of spent fuel is needed. Alternative spent fuel cooling can be provided by a retrofitted spent fuel pool spray system based on the AP1000 plant design. As part of Krsko Nuclear Power Plant's Safety Upgrade Program, Krsko Nuclear Power Plant decided on, and Westinghouse successfully designed a retrofit of the AP1000 {sup registered} plant spent fuel pool spray system to provide alternative spent fuel cooling.

  15. Design and field measurement of the BEPC-II interaction region dual-aperture quadrupoles

    International Nuclear Information System (INIS)

    Yin, Z.S.; Wu, Y.Z.; Zhang, J.F.; Chen, W.; Li, Y.J.; Li, L.; Hou, R.; Yin, B.G.; Sun, X.J.; Ren, F.L.; Wang, F.A.; Chen, F.S.; Yu, C.H.; Chen, C.

    2007-01-01

    With the Beijing Electron Positron Collider upgrade project (BEPC-II), two dual-aperture septum-style quadrupole magnets are used in the interaction region for the final focusing of the electron and positron beams. The BEPC-II lattice design calls for the same high quality integral quadrupole field and large good field region in both apertures for each magnet. Two-dimensional contour optimization and pole-end chamfer iteration are used to minimize the systematic harmonic errors. Unexpected non-systematic errors induced by the unsymmetrical structure and the manufacturing errors are compensated with the pole-end shimming. Magnet measurements with rotating coils are performed to guide and confirm the magnet design. This paper discusses the design consideration, optimizing procedure and measurement results of these dual-aperture magnets

  16. A FASTBUS flash ADC system for the Mark II vertex chamber

    Energy Technology Data Exchange (ETDEWEB)

    Barker, L.

    1988-10-01

    This is a description of a flash ADC system built for the Mark II experiment at the Stanford Linear Accelerator Center (SLAC). This system was designed for use in the experiment's vertex chamber where signals could occur over a relatively long time, approximately 10 microseconds. This long time, coupled with fast cable amplifiers, necessitated an alternate design approach than was used with a dE/dX FASTBUS flash ADC design. 1 ref., 6 figs.

  17. An Over-damped Cavity Longitudinal Kicker for the PEP-II LER

    CERN Document Server

    McIntosh, P

    2003-01-01

    Both rings of PEP-II use drift tube kickers in the longitudinal bunch-by-bunch feedback system. Efforts are now underway to increase the stored beam currents and luminosity of PEP-II, and beam-induced heating of these structures, particularly in the Low Energy Ring (LER) is of concern. An alternative kicker design based on the over-damped cavity kicker, first developed by INFN-Frascati is being built for PEP-II. This low loaded Q (or wide bandwidth) structure is fed by a network of ridged waveguides coupled to a simple pill-box cavity. Beam induced RF power is also coupled out of the cavity to external loads, so that the higher order modes (HOMs) excited in the structure are well-damped. This paper details the kicker design for PEP-II and discusses some of the design trade-offs between shunt impedance and bandwidth, as well as the influence of the feedthroughs on the kicker parameters. Estimates of the expected power deposition in the cavity are also provided.

  18. Analysis of Central Design Agency Alternatives for Navy Industrial Fund Accounting Systems: A Proposed Methodology.

    Science.gov (United States)

    1980-03-01

    Postgraduate School ANA01611I NM61"fa Monterey, California 93940 1 CON TROLLING OFFICE NAMC &NO Accaes ii uOmvo*a Naval Postgraduate School March 1980...judge alternative 3, it is further recomended that the Naval Audit Service, private contractor or other independent agent be comissioned to perform an in...Government Accounting, Government Accounting, Auditing , and Financial Reporting, Chicago, Municipal Finance Officer’s Association, 1968, p. 3-4. 4

  19. Alternative bipolar plates design and manufacturing for PEM fuel cell

    International Nuclear Information System (INIS)

    Lee Chang Chuan; Norhamidi Muhamad; Jaafar Sahari

    2006-01-01

    Bipolar plates is one of the important components in fuel cell stack, it comprise up to 80% of the stack volume. Traditionally, these plates have been fabricated from graphite, owing to its chemical nobility, and high electrical and thermal conductivity; but these plates are brittle and relatively thick. Therefore increasing the stack volume and size. Alternatives to graphite are carbon-carbon composite, carbon-polymer composite and metal (aluminum, stainless steel, titanium and nickel based alloy). The use of coated and uncoated metal bipolar plates has received attention recently due to the simplicity of plate manufacturing. The thin nature of the metal substrate allows for smaller stack design with reduced weight. Lightweight coated metals as alternative to graphite plate is being developed. Beside the traditional method of machining and slurry molding, metal foam for bipolar plates fabrication seems to be a good alternative. The plates will be produced with titanium powder by Powder Metallurgy method using space holders technique to produce the meal foam flow-field. This work intends to facilitate the materials and manufacturing process requirements to produce cost effective foamed bipolar plates for fuel cell

  20. Sustainable covers for uranium mill tailings, USA: alternative design, performance, and renovation - 16369

    International Nuclear Information System (INIS)

    Waugh, William J.; Benson, Craig H.; Albright, William H.

    2009-01-01

    The U.S. Department of Energy Office of Legacy Management is investigating alternatives to conventional cover designs for uranium mill tailings. A cover constructed in 2000 near Monticello, Utah, USA, was a redundant design with a conventional low-conductivity composite cover overlain with an alternative cover designed to mimic the natural soil water balance as measured in nearby undisturbed native soils and vegetation. To limit percolation, the alternative cover design relies on a 160-cm layer of sandy clay loam soil overlying a 40- cm sand capillary barrier for water storage, and a planting of native sagebrush steppe vegetation to seasonally release soil water through evapotranspiration (ET). Water balance monitoring within a 3.0-ha drainage lysimeter, embedded in the cover during construction, provided convincing evidence that the cover has performed well over a 9-year period (2000- 2009). The total cumulative percolation, 4.8 mm (approximately 0.5 mm yr -1 ), satisfied a regulatory goal of -1 . Most percolation can be attributed to the very wet winter and spring of 2004-2005, when soil water content exceeded the storage capacity of the cover. Diversity, percent cover, and leaf area of vegetation increased over the monitoring period. Field and laboratory evaluations several years after construction show that soil structural development, changes in soil hydraulic properties, and development of vegetation patterns have not adversely impacted cover performance. A new test facility was constructed in 2008 near Grand Junction, Colorado, USA, to evaluate low-cost methods for renovating or transforming conventional covers into more sustainable ET covers. (authors)

  1. HL-LHC alternatives

    CERN Document Server

    Tomás, R; White, S

    2014-01-01

    The HL-LHC parameters assume unexplored regimes for hadron colliders in various aspects of accelerator beam dynamics and technology. This paper reviews three alternatives that could potentially improve the LHC performance: (i) the alternative filling scheme 8b+4e, (ii) the use of a 200 MHz RF system in the LHC and (iii) the use of proton cooling methods to reduce the beam emittance (at top energy and at injection). The alternatives are assessed in terms of feasibility, pros and cons, risks versus benefits and the impact on beam availability.

  2. Improvement of SSR core design for ABWR-II

    International Nuclear Information System (INIS)

    Moriwaki, Masanao; Aoyama, Motoo; Okada, Hiroyuki; Kitamura, Hideya; Sakurada, Koichi; Tanabe, Akira

    2003-01-01

    In order to enhance the spectral shift effect in the ABWR-II reactor, a novel core design to bring out better performance of spectral shift rods (SSRs) is studied. The SSR is a new type of water rod, in which the water level develops naturally during operation and changes according to the coolant flow rate through the channel. By using the SSR, the average moderator density, which is directly related to core reactivity, can be controlled over a wide range by the core flow rate. In the new SSR core design, two types of SSR bundles, in which settings for the SSR water levels are different, are utilized and loaded according to flow distribution in the core. This two-region SSR core design allows wide variation in the average SSR water level, thus improving fuel economy. Enhancement of SSR function in the two-region SSR core increases the uranium saving factor by about 25%, from the 6% of the conventional uniform SSR core to about 8%. (author)

  3. Lightweight Design of an HTS Coil for the VASIMR Experiment, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — In this Phase II SBIR contract Tai-Yang Research Company of Tennessee proposes to design, fabricate, and test an ultra-lightweight High Temperature Superconducting...

  4. Calculation of drift seepage for alternative emplacement designs

    International Nuclear Information System (INIS)

    Li, Guomin; Tsang, Chin-Fu; Birkholzer, Jens

    1999-01-01

    The calculations presented in this report are performed to obtain seepage rates into drift and boreholes for two alternative designs of drift and waste emplacement at Yucca Mountain. The two designs are defined according to the Scope of Work 14012021M1, activity 399621, drafted October 6, 1998, and further refined in a conference telephone call on October 13, 1998, between Mark Balady, Jim Blink, Rob Howard and Chin-Fu Tsang. The 2 designs considered are: (1) Design A--Horizontal boreholes 1.0 m in diameter on both sides of the drift, with each borehole 8 m long and inclined to the drift axis by 30 degrees. The pillar between boreholes, measured parallel to the drift axis, is 3.3 m. In the current calculations, a simplified model of an isolated horizontal borehole 8 m long will be simulated. The horizontal borehole will be located in a heterogeneous fracture continuum representing the repository layer. Three different realizations will be taken from the heterogeneous field, representing three different locations in the rock. Seepage for each realization is calculated as a function of the percolation flux. Design B--Vertical boreholes, 1.0 m in diameter and 8.0 m deep, drilled from the bottom of an excavated 8.0 m diameter drift. Again, the drift with the vertical borehole will be assumed to be located in a heterogeneous fracture continuum, representing the rock at the repository horizon. Two realizations are considered, and seepage is calculated for the 8-m drift with and without the vertical 1-m borehole at its bottom

  5. Conceptual design of ICF reactor SENRI, Part II. Advances in design and pellet gain scaling

    International Nuclear Information System (INIS)

    Ido, S.; Mima, K.; Nakai, S.; Tsuji, R.; Yamanaka, C.

    1984-01-01

    This chapter reviews the recent design studies on reactor concepts with magnetically guided lithium flow, SENRI-I, SENRI-IA and SENRI-II. The routes from the present status to power reactors and an advanced fuel pellet concept is also discussed. Topics covered include pellet design, magnetohydrodynamic design of liquid lithium flow; reactor cavity concepts with magnetically guided lithium flow, a thermo-hydraulic analysis, a tritium recovery system; and an advanced fuel pellet concept for an inertial confinement fusion (ICF) reactor without a tritium breeding blanket. An advanced fuel pellet for an ICF reactor without a T breeder was studied in the model calculations, which showed sufficiently high values of pellet gain. Includes a table and 8 diagrams

  6. Water chemistry of Atucha II PHWVR. Design concepts and evolution

    International Nuclear Information System (INIS)

    Chocron, Mauricio; Rodriguez, Ivanna; Duca, Jorge; Fernandez, Ricardo; Rico, Jorge

    2007-01-01

    Full text: Atucha II is a pressurized heavy water vessel reactor designed by Siemens-KWU, currently part of AREVA NP, of 745 MWe and similar to Atucha I, which has been in operation over 25 years. The primary heat transport system (PHTS) is composed by vertical channels (277-313 C degrees) that allocate the fuel elements while the moderator circuit is composed by a partially separated circuit (142-173 C degrees). The moderation power is transferred to the feedwater through the moderator heat exchangers (HX). These HXs operate as the last, high pressure water-steam cycle heaters as well. Materials (with exception of fuel channels and fuel sheaths which are made of zirconium alloys) are all austenitic steels while cobalt containing alloys have been all replaced at the design stage. Steam generator and moderator HX tubing are Alloy 800 made. The core is operated without boron except with the first fresh nucleus. The secondary circuit or Balance of plant (BOP) is similar in conception to that of a PWR but the moderator HXs. It is entirely built of ferrous alloys, has a feedwater-deaerator tank and moisture separator. The energy sink is the Rio de la Plata River. The Reactors Chemistry Department, Chemistry Division, National Atomic Energy Commission, in its character of R and D institution has been committed by CNA II-N.A.S.A Project to prepare the water chemistry specifications, water chemistry engineering and manuals, considering the type of reactor, design and construction aspects and operation characteristics, taking into account the current state-of-the art and worldwide standards. This includes conceptual aspects and implementation and operative aspects as well. This documentation will be released after a designer's review as it has been stated in the respective agreement. Respecting the confidentiality agreement between CNEA and NASA and the confidentiality regarding handling original documentation provided by the designer, it is considered illustrative to

  7. Beta II plasma-gun mechanical design and construction

    International Nuclear Information System (INIS)

    Pedrotti, L.; Deis, G.; Wong, R.; Calderon, M.; Chargin, A.; Garner, D.

    1979-01-01

    The magnetized coaxial plasma gun (located on the east end of the Beta II facility at the Lawrence Livermore Laboratory) will be used to test a new method of initiating a field reversed mirror plasma. The field-reversed mirror is expected to improve the mirror-fusion reactor by enhancing the ratio of fusion power to injected power. This paper concentrates on the mechanical design and construction of the magnetized coaxial plasma gun and also discusses the diagnostic devices necessary to demonstrate the formation of field-reversed rings

  8. Control console conceptual design for sheet type fuels of Triga Mark-II reactor

    International Nuclear Information System (INIS)

    Eko Priyono; Kurnia Wibowo; Anang Susanto

    2016-01-01

    The control console conceptual design for sheet type fuel of TRIGA Mark-II reactor has been made. The control console conceptual design was made with refer study result of instrument and control system which is used in BATAN'S reactor i.e TRIGA-2000 Bandung, TRIGA Yogyakarta and MPR-30 Serpong. The control console conceptual design was made by using AutoCad software. The control console conceptual design reactor for sheet type fuel of TRIGA Mark-II reactor consist of 5 segments that is 3 segments for placing the computer monitors, 1 segment for placing bargraph displays and recorders and 1 segment for placing panel meters. There are the door on front and back position at each segment for enter and out devices in the console. The control console conceptual design is also equipped by the table along in front of console for placing reactor panel control and for writing, 3 drawers for 3 keyboards. The dimension of console will refer control room size and the components will be placed on console which will be detailed in detail design if this conceptual design has been approved. (author)

  9. A comparison of alternative 60-mer probe designs in an in-situ synthesized oligonucleotide microarray

    Directory of Open Access Journals (Sweden)

    Fairbanks Benjamin D

    2006-04-01

    Full Text Available Abstract Background DNA microarrays have proven powerful for functional genomics studies. Several technologies exist for the generation of whole-genome arrays. It is well documented that 25mer probes directed against different regions of the same gene produce variable signal intensity values. However, the extent to which this is true for probes of greater length (60mers is not well characterized. Moreover, this information has not previously been reported for whole-genome arrays designed against bacteria, whose genomes may differ substantially in characteristics directly affecting microarray performance. Results We report here an analysis of alternative 60mer probe designs for an in-situ synthesized oligonucleotide array for the GC rich, β-proteobacterium Burkholderia cenocepacia. Probes were designed using the ArrayOligoSel3.5 software package and whole-genome microarrays synthesized by Agilent, Inc. using their in-situ, ink-jet technology platform. We first validated the quality of the microarrays as demonstrated by an average signal to noise ratio of >1000. Next, we determined that the variance of replicate probes (1178 total probes examined of identical sequence was 3.8% whereas the variance of alternative probes (558 total alternative probes examined designs was 9.5%. We determined that depending upon the definition, about 2.4% of replicate and 7.8% of alternative probes produced outlier conclusions. Finally, we determined none of the probe design subscores (GC content, internal repeat, binding energy and self annealment produced by ArrayOligoSel3.5 were predictive or probes that produced outlier signals. Conclusion Our analysis demonstrated that the use of multiple probes per target sequence is not essential for in-situ synthesized 60mer oligonucleotide arrays designed against bacteria. Although probes producing outlier signals were identified, the use of ratios results in less than 10% of such outlier conclusions. We also determined that

  10. RF system design for the PEP-II B Factory

    International Nuclear Information System (INIS)

    Schwarz, H.; Rimmer, R.

    1994-06-01

    The paper presents an overview of the design of the RF system for the PEP-II B Factory. An RF station consists of either two or four single-cell cavities driven by a 1.2 MW klystron through a waveguide distribution network. A variety of feedback loops stabilize the RF and its interaction with the beam. System parameters and all the relevant parameters of klystron and cavities are given

  11. Alternative routes for highway shipments of radioactive materials and lessons learned from state designations

    International Nuclear Information System (INIS)

    1990-07-01

    Pursuant to the Hazardous Materials Transportation Act (HMTA), the Department of Transportation (DOT) has promulgated a comprehensive set of regulations regarding the highway transportation of high-level radioactive materials. These regulations, under docket numbers HM-164 and HM-164A, establish interstate highways as the preferred routes for the transportation of radioactive materials within and through the states. The regulations also provide a methodology by which a state may select altemative routes. First, the state must establish a ''state routing agency'', defined as an entity authorized to use the state legal process to impose routing requirements on carriers of radioactive material (49 CFR 171.8). Once identified, the state routing agency must select routes in accordance with DOTs Guidelines for Selecting Preferred Highway Routes for Large Quantity Shipments of Radioactive Materials or an equivalent routing analysis. Adjoining states and localities should be consulted on the impact of proposed alternative routes as a prerequisite of final route selection. Lastly, the states must provide written notice to DOT of any alternative route designation before the routes are deemed effective. The purpose of this report is to discuss the ''lessons learned'' by the five states within the southern region that have designated alternative or preferred routes under the regulations of the Department of Transportation (DOT) established for the transportation of radioactive materials. The document was prepared by reviewing applicable federal laws and regulations, examining state reports and documents and contacting state officials and routing agencies involved in making routing decisions. In undertaking this project, the Southern States Energy Board hopes to reveal the process used by states that have designated alternative routes and thereby share their experiences (i.e., lessons learned) with other southern states that have yet to make designations

  12. 40 CFR 63.447 - Clean condensate alternative.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 9 2010-07-01 2010-07-01 false Clean condensate alternative. 63.447... alternative. As an alternative to the requirements specified in § 63.443(a)(1)(ii) through (a)(1)(v) for the... HAP emissions reductions achieved by this clean condensate alternative technology are equal to or...

  13. RIP Input Tables From Wapdeg For LA Design Selection: Enhanced Design Alternative IIIb

    International Nuclear Information System (INIS)

    K.G. Mon; K.G. Mast; J.H. Lee

    1999-01-01

    The purpose of this calculation is to document the Waste Package Degradation (WAPDEG) version 3.09 (CRWMS M and O 1998b. 'Software Routine Report for WAPDEG' (Version 3.09)) simulations used to analyze degradation and failure of 2-cm thick titanium grade 7 corrosion resistant material (CRM) drip shields as well as degradation and failure of the waste packages over which they are placed. The waste packages are composed of two corrosion resistant materials (CRM) barriers. The outer barrier is composed of 2 cm of Alloy 22 and the inner barrier is composed of 1.5 cm of titanium grade 7. The WAPDEG simulation results are post-processed into tables of drip shield/waste package degradation time histories suitable for use as input into the Integrated Probabilistic Simulator for Environmental Systems (RIP) version 5.19.01 (Golder Associates 1998) computer code. This calculation supports Performance Assessment analysis of the License Application Design Selection (LADS) Enhanced Design Alternative IIIb

  14. The physics design of EBR-II; Physique du reacteur EBR-II; Fizicheskij raschet ehksperimental'nogo reaktora - razmnozhitelya EVR-II; Aspectos fisicos del reactor EBR-II

    Energy Technology Data Exchange (ETDEWEB)

    Loewenstein, W. B. [Argonne National Laboratory, Argonne, IL (United States)

    1962-03-15

    The physics design oi EBR-II. Calculations of the static, dynamic and long-term reactivity behaviour of EBR-II are reported together with results and analysis of EBR-II dry critical and ZPR-III mock-up experiments. Particular emphasis is given to reactor-physics design problems which arise after the conceptual design is established and before the reactor is built or placed into operation. Reactor-safety analyses and hazards-evaluation considerations are described with their influence on the reactor design. The manner of utilizing the EBR-II mock-up on ZPR-III data and the EBR-II dry critical data is described. These experiments, their analysis and theoretical predictions are the basis for predetermining the physics behaviour of the reactor system. The limitations inherent in applying the experimental data to the performance of the power-reactor system are explored in some detail. This includes the specification of reactor core size and/or fuel-alloy enrichment, provisions for adequate operating and shut-down reactivity, determination of operative temperature and power coefficients of reactivity, and details of power- and flux-distribution as a function of position within the reactor structure. The overall problem of transferring information from simple idealized analytical or experimental geometry to actual hexagonal reactor geometry is described. Nuclear performance, including breeding, of the actual reactor system is compared with that of the idealized conceptual system. The long-term reactivity and power behaviour of the reactor blanket is described within the framework of the proposed cycling of the fuel and blanket alloy. Safety considerations, including normal and abnormal rates of reactivity-insertion, the implication of postulated reactivity effects based on the physical behaviour of the fuel alloy and reactor structure as well as extrapolation of TREAT experiments to the EBR-II system are analysed. The EBR-II core melt-down problem is reviewed. (author

  15. Digital logic circuit design with ALTERA Quartus II

    International Nuclear Information System (INIS)

    Lee, Seung Ho

    2009-09-01

    This book consists 31 chapters about digital logic circuit with ALTERA Quartus II. It includes the introduction of ALTERA Quartus II, ALTERA Quartus II schematic editor, ALTERA Quartus II compiler, ALTERA Quartus II simulator, ALTERA Quartus II timing analyzer, how to use HBE-COMBO II training and HBE-COMBO II training kit with schematic editor, VHDL grammar and practice of ALTERA Quartus II and HBE-COMBO II training kit with VHDL.

  16. DEVELOPING GUIDED DISCOVERY LEARNING MATERIALS USING MATHEMATICS MOBILE LEARNING APPLICATION AS AN ALTERNATIVE MEDIA FOR THE STUDENTS CALCULUS II

    Directory of Open Access Journals (Sweden)

    Sunismi .

    2015-12-01

    Full Text Available Abstract: The development research aims to develop guided-discovery learning materials of Calculus II by implementing Mathematics Mobile Learning (MML. The products to develop are MML media of Calculus II using guided discovery model for students and a guide book for lecturers. The study employed used 4-D development model consisting of define, design, develop, and disseminate. The draft of the learning materials was validated by experts and tried-out to a group of students. The data were analyzed qualitatively and quantitatively by using a descriptive technique and t-test. The findings of the research were appropriate to be used ad teaching media for the students. The students responded positively that the MML media of Calculus II using the guided-discovery model was interestingly structured, easily operated through handphones (all JAVA, android, and blackberry-based handphones to be used as their learning guide anytime. The result of the field testing showed that the guided-discovery learning materials of Calculus II using the Mathematics Mobile Learning (MML application was effective to adopt in learning Calculus II. Keywords: learning materials, guided-discovery, mathematics mobile learning (MML, calculus II PENGEMBANGAN BAHAN AJAR MODEL GUIDED DISCOVERY DENGAN APLIKASI MATHEMATICS MOBILE LEARNING SEBAGAI ALTERNATIF MEDIA PEMBELAJARAN MAHASISWA MATAKULIAH KALKULUS II Abstrak: Penelitian pengembangan ini bertujuan untuk mengembangkan bahan ajar matakuliah Kalkulus II model guided discovery dengan aplikasi Mathematics Mobile Learning (MML. Produk yang dikembangkan berupa media MML Kalkulus II dengan model guided discovery untuk mahasiswa dan buku panduan dosen. Model pengembangan menggunakan 4-D yang meliputi tahap define, design, develop, dan dissemination. Draf bahan ajar divalidasi oleh pakar dan diujicobakan kepada sejumlah mahasiswa. Data dianalisis secara kualitatif dan kuantitatif dengan teknik deskriptif dan uji t. Temuan penelitian

  17. Alternative Shear Panel Configurations for Light Wood Construction. Development, Seismic Performance, and Design Guidance

    Science.gov (United States)

    Wilcoski, James; Fischer, Chad; Allison, Tim; Malach, Kelly Jo

    2002-04-01

    Shear panels are used in light wood construction to resist lateral loads resulting from earthquakes or strong winds. These panels are typically made of wooden sheathing nailed to building frame members, but this standard panel design interferes with the installation of sheet insulation. A non-insulated shear panel conducts heat between the building interior and exterior wasting considerable amounts of energy. Several alternative shear panel designs were developed to avoid this insulation-mounting problem and sample panels were tested according to standard cyclic test protocols. One of the alternative designs consisted of diagonal steel straps nailed directly to the structural framing. Several others consisted of sheathing nailed to 2 x 4 framing then set into a larger 2 x 6 structural frame in such a way that no sheathing protruded beyond the edge of the 2 x 6 members. Also samples of industry-standard shear panels were constructed and tested in order to establish a performance baseline. Analytical models were developed to size test panels and predict panel behavior. A procedure was developed for establishing design capacities based on both test data and established baseline panel design capacity. The behavior of each panel configuration is documented and recommended design capacities are presented.

  18. Organ preservation in stage II and III head and neck cancer utilizing alternate week concomitant chemoradiotherapy

    International Nuclear Information System (INIS)

    Mansur, David B.; Vokes, Everett; Mittal, Bharat B.; Stenson, Kerstin; Kies, M.; Pelzer, H.; Nautiyal, Jaishanker; Kozloff, Mark; Weichselbaum, Ralph R.; Haraf, Daniel J.

    1996-01-01

    Purpose: A prospective phase II trial was conducted to determine the efficacy and rate of organ preservation of alternate week concomitant chemoradiotherapy in stage II and III head and neck cancer. Methods: Forty-nine patients (10 stage II and 39 stage III) with squamous cell carcinoma of the head and neck region have been entered into a prospective phase II trial. Pretreatment evaluation included history and physical examination, computed tomography of the neck, bone scan, chest x-ray, panendoscopy and biopsy confirmation of malignancy. Therapy is given in 2 week cycles consisting of 5 days of concomitant chemoradiotherapy followed by a nine day break during which no treatment is given. Each cycle of treatment consists of 1.0 gm hydroxyurea P.O. every 12 hours for 6 days (11 doses per cycle) and 800mg/m 2 /d continuous infusion 5-fluorouracil along with concomitant radiation therapy (RT) administered in 1.8-2.0 Gy daily fractions for five days. This alternate week (week on/week off) schedule is continued for a total of 7 cycles resulting in an overall treatment time of 13 weeks and a total RT dose of 70 Gy. Extent of initial surgery included biopsy only (59.2%), minimal laser debulking (12.2%), and resection with or without neck dissection (28.6%). Results: The majority of patients are male (71.4%), with a median age of 61.3 years. Primary sites included oral cavity (16.3%), oropharynx (12.2%), larynx (57.1%), hypopharynx (8.1%), and nasopharynx (4.1%). T stage included T3 (32 patients, 65.3%), T2 (16 patients, 32.7%), and T1 (1 patient). N stage included N1 (17 patients, 34.7%), and N0 (32 patients, 65.3%). With a median follow-up of 27 months, the overall response rate is 100% (91.7 complete response, and 8.3% partial response). The 5 year actuarial local control, disease free survival, and overall survival is 90.1%, 88.3%, and 65.0%, respectively. One patient has failed with distant disease alone. Four patients had isolated local failures and (3(4)) were

  19. Lithography alternatives meet design style reality: How do they "line" up?

    Science.gov (United States)

    Smayling, Michael C.

    2016-03-01

    Optical lithography resolution scaling has stalled, giving innovative alternatives a window of opportunity. One important factor that impacts these lithographic approaches is the transition in design style from 2D to 1D for advanced CMOS logic. Just as the transition from 3D circuits to 2D fabrication 50 years ago created an opportunity for a new breed of electronics companies, the transition today presents exciting and challenging time for lithographers. Today, we are looking at a range of non-optical lithography processes. Those considered here can be broadly categorized: self-aligned lithography, self-assembled lithography, deposition lithography, nano-imprint lithography, pixelated e-beam lithography, shot-based e-beam lithography .Do any of these alternatives benefit from or take advantage of 1D layout? Yes, for example SAPD + CL (Self Aligned Pitch Division combined with Complementary Lithography). This is a widely adopted process for CMOS nodes at 22nm and below. Can there be additional design / process co-optimization? In spite of the simple-looking nature of 1D layout, the placement of "cut" in the lines and "holes" for interlayer connections can be tuned for a given process capability. Examples of such optimization have been presented at this conference, typically showing a reduction of at least one in the number of cut or hole patterns needed.[1,2] Can any of the alternatives complement each other or optical lithography? Yes.[3] For example, DSA (Directed Self Assembly) combines optical lithography with self-assembly. CEBL (Complementary e-Beam Lithography) combines optical lithography with SAPD for lines with shot-based e-beam lithography for cuts and holes. Does one (shrinking) size fit all? No, that's why we have many alternatives. For example NIL (Nano-imprint Lithography) has been introduced for NAND Flash patterning where the (trending lower) defectivity is acceptable for the product. Deposition lithography has been introduced in 3D NAND Flash to

  20. Refuge alternatives relief valve testing and design with updated test stand.

    Science.gov (United States)

    Lutz, T J; Bissert, P T; Homce, G T; Yonkey, J A

    2018-03-01

    Underground refuge alternatives require an air source to supply breathable air to the occupants. This requires pressure relief valves to prevent unsafe pressures from building up within the refuge alternative. The U.S. Mine Safety and Health Administration (MSHA) mandates that pressure relief valves prevent pressure from exceeding 1.25 kPa (0.18 psi), or as specified by the manufacturer, above mine atmospheric pressure when a fan or compressor is used for the air supply. The U.S. National Institute for Occupational Safety and Health (NIOSH) tested a variety of pressure relief valves using an instrumented test fixture consisting of data acquisition equipment, a centrifugal blower, ductwork and various sensors to determine if the subject pressure relief valves meet the MSHA requirement. Relief pressures and flow characteristics, including opening pressure and flow rate, were measured for five different pressure relief valves under a variety of conditions. The subject pressure relief valves included two off-the-shelf modified check valves, two check valves used in MSHA-approved built-in-place refuge alternatives, and a commercially available valve that was designed for a steel refuge alternative and is currently being used in some built-in-place refuge alternatives. The test results showed relief pressures ranging from 0.20 to 1.53 kPa (0.03 to 0.22 psi) and flow rates up to 19.3 m 3 /min (683 scfm). As tested, some of the pressure relief valves did not meet the 1.25 kPa (0.18 psi) relief specification.

  1. THE ALTERNATIVE CORELDRAWINGS AN IDEAL SOLUTION FOR DESIGNERS, IN EMBROIDERY

    Directory of Open Access Journals (Sweden)

    Marin Florea

    2013-01-01

    Full Text Available The machine beaded appearance coincides with the first sewing machine mechanical America sold out in the best-known company of sewing machines in the world: The singer Company in the year 1863. The first machine beaded computer-assisted has been constructed by Wilcom in 1980. After 1990, developments in microprocessors allowed that all types of mechanical machines beaded to turn to digital machines beaded. These machines use digital designs. Developments in digital beaded machines allowed customization industrial products made in series. The raw material that is most important is a digital drawing. List of most important brands is high. Taking into account the number of large editors for embroidery it is almost impossible for a designer to know CAD design for all text editors. This is a problem both for designers but also for producers. A practical solution for designers is CorelDrawings what offers the convenience of design specific vector graphic-designers. Automatic conversion of the vector, the library with textures, simulate embroideries and save specific formats great brands make CorelDrawings a practical alternative. Designer can focus on specific problems without using a large number of editors for each brand. We approached a drawing of the logo to demonstrate practical capabilities. Drawing digital was saved in a format and open industrial professional editor Wilcom Designer. Export to grid format may allow analysis and discussions with the customer before it has been transposed into production.

  2. The PIP-II Conceptual Design Report

    Energy Technology Data Exchange (ETDEWEB)

    Ball, M. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Burov, A. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Chase, B. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Chakravarty, A. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Chen, A. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Dixon, S. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Edelen, J. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Grassellino, A. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Johnson, D. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Holmes, S. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Kazakov, S. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Klebaner, A. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Kourbanis, I. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Leveling, A. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Melnychuk, O. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Neuffer, D. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Nicol, T. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Ostiguy, J. -F. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Pasquinelli, R. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Passarelli, D. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Ristori, L. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Pellico, W. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Patrick, J. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Prost, L. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Rakhno, I. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Saini, A. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Schappert, W. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Shemyakin, A. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Steimel, J. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Scarpine, V. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Vivoli, A. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Warner, A. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Yakovlev, V. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Ostroumov, P. [Argonne National Lab. (ANL), Argonne, IL (United States); Conway, Z. [Argonne National Lab. (ANL), Argonne, IL (United States)

    2017-03-01

    The Proton Improvement Plan-II (PIP-II) encompasses a set of upgrades and improvements to the Fermilab accelerator complex aimed at supporting a world-leading neutrino program over the next several decades. PIP-II is an integral part of the strategic plan for U.S. High Energy Physics as described in the Particle Physics Project Prioritization Panel (P5) report of May 2014 and formalized through the Mission Need Statement approved in November 2015. As an immediate goal, PIP-II is focused on upgrades to the Fermilab accelerator complex capable of providing proton beam power in excess of 1 MW on target at the initiation of the Long Baseline Neutrino Facility/Deep Underground Neutrino Experiment (LBNF/DUNE) program, currently anticipated for the mid- 2020s. PIP-II is a part of a longer-term goal of establishing a high-intensity proton facility that is unique within the world, ultimately leading to multi-MW capabilities at Fermilab....

  3. Evaluation of alternative public transportation systems in Izmit urban transportation via axiomatic design method

    Directory of Open Access Journals (Sweden)

    Gülşen AKMAN

    2016-02-01

    Full Text Available In the world and in our country, most of urban transportation is performed by public transportation. Public transportation is a system which provides transportation easiness and opportunity to people, not to vehicles. Therefore, giving priority to public transportation system is necessary in organizing urban transportation. In this study, in order to reduce traffic intensity and to facilitate passenger transportation in Izmit urban transportation, It is tried to determine appropriate public transportation system. For this, firstly, alternatives which could be used for public transportation were determined. These alternatives are metro, metrobus, tram, light rail system and monorail. Afterwards, the variables affecting decision making about public transportation were determined. These variables are cost, transportation line features, vehicle characteristics, sensitivity to environment and customer satisfaction. Lastly, most appropriate public transportation system is proposed by using the axiomatic design method. As a result, light trail system and metrobus are determined as the most appropriate alternatives for Izmit public transportation system.Keywords: Urban transportation, Multi criteria decision making, Axiomatic design

  4. Raman Microspectroscopic Mapping with Multivariate Curve Resolution-Alternating Least Squares (MCR-ALS) Applied to the High-Pressure Polymorph of Titanium Dioxide, TiO2-II.

    Science.gov (United States)

    Smith, Joseph P; Smith, Frank C; Ottaway, Joshua; Krull-Davatzes, Alexandra E; Simonson, Bruce M; Glass, Billy P; Booksh, Karl S

    2017-08-01

    The high-pressure, α-PbO 2 -structured polymorph of titanium dioxide (TiO 2 -II) was recently identified in micrometer-sized grains recovered from four Neoarchean spherule layers deposited between ∼2.65 and ∼2.54 billion years ago. Several lines of evidence support the interpretation that these layers represent distal impact ejecta layers. The presence of shock-induced TiO 2 -II provides physical evidence to further support an impact origin for these spherule layers. Detailed characterization of the distribution of TiO 2 -II in these grains may be useful for correlating the layers, estimating the paleodistances of the layers from their source craters, and providing insight into the formation of the TiO 2 -II. Here we report the investigation of TiO 2 -II-bearing grains from these four spherule layers using multivariate curve resolution-alternating least squares (MCR-ALS) applied to Raman microspectroscopic mapping. Raman spectra provide evidence of grains consisting primarily of rutile (TiO 2 ) and TiO 2 -II, as shown by Raman bands at 174 cm -1 (TiO 2 -II), 426 cm -1 (TiO 2 -II), 443 cm -1 (rutile), and 610 cm -1 (rutile). Principal component analysis (PCA) yielded a predominantly three-phase system comprised of rutile, TiO 2 -II, and substrate-adhesive epoxy. Scanning electron microscopy (SEM) suggests heterogeneous grains containing polydispersed micrometer- and submicrometer-sized particles. Multivariate curve resolution-alternating least squares applied to the Raman microspectroscopic mapping yielded up to five distinct chemical components: three phases of TiO 2 (rutile, TiO 2 -II, and anatase), quartz (SiO 2 ), and substrate-adhesive epoxy. Spectral profiles and spatially resolved chemical maps of the pure chemical components were generated using MCR-ALS applied to the Raman microspectroscopic maps. The spatial resolution of the Raman microspectroscopic maps was enhanced in comparable, cost-effective analysis times by limiting spectral resolution

  5. Mechanical Design and Analysis of LCLS II 2 K Cold Box

    Science.gov (United States)

    Yang, S.; Dixon, K.; Laverdure, N.; Rath, D.; Bevins, M.; Bai, H.; Kaminski, S.; Ravindranath, V.

    2017-12-01

    The mechanical design and analysis of the LCLS II 2 K cold box are presented. Its feature and functionality are discussed. ASME B31.3 was used to design its internal piping, and compliance of the piping code was ensured through flexibility analysis. The 2 K cold box was analyzed using ANSYS 17.2; the requirements of the applicable codes—ASME Section VIII Division 2 and ASCE 7-10—were satisfied. Seismic load was explicitly considered in both analyses.

  6. Design and Fabrication of the Lithium Beam Ion Injector for NDCX-II

    International Nuclear Information System (INIS)

    Takakuwa, J.

    2011-01-01

    A 130 keV injector is developed for the NDCX-II facility. It consists of a 10.9 cm diameter lithium doped alumina-silicate ion source heated to ∼1300 C and 3 electrodes. Other components include a segmented Rogowski coil for current and beam position monitoring, a gate valve, pumping ports, a focusing solenoid, a steering coil and space for inspection and maintenance access. Significant design challenges including managing the 3-4 kW of power dissipation from the source heater, temperature uniformity across the emitter surface, quick access for frequent ion source replacement, mechanical alignment with tight tolerance, and structural stabilization of the cantilevered 27-inch OD graded HV ceramic column. The injector fabrication is scheduled to complete by May 2011, and assembly and installation is scheduled to complete by the beginning of July. The Neutralized Drift Compression eXperiment (NDCX-II) is for the study of high energy density physics and inertial fusion energy research utilizing a lithium ion (Li+) beam with a current of 93 mA and a pulse length of 500 ns (compressed to 1 ns at the target). The injector is one of the most complicated sections of the NDCX-II accelerator demanding significant design and fabrication resources. It needs to accommodate a relatively large ion source (10.9 cm), a high heat load (3-4 kW) and specific beam optics developed from the physics model. Some specific design challenges are noted in this paper.

  7. An alternate end design for SSC dipoles

    International Nuclear Information System (INIS)

    Peters, C.; Caspi, S.; Taylor, C.

    1989-02-01

    Experience in the SSC dipole program has shown that fabrication of cylindrical coil ends is difficult. Cable stiffness requires large forces to maintain the proper position of the conductors in the end during winding. After winding, the coil ends remain distorted nd significant motion of the need conductors is required to force the coil end into the molding cavity. Local mechanical stresses are high during this process and extra pieces of insulation are required to prevent turn-to-turn shorts from developing during the winding and molding steps. Prior to assembly the coil end is compressed in a mold cavity and injected with a filler material to correct surface irregularities and fill voids in the end. LBL has developed an alternate design which permits the conductors to be wound over the end using minimal force and technician coerosion. The conductors are placed on a conical surface where the largest diameter over the outer layer conductors is 10 cm. No coil end spaces or insulation pieces between turns are required. The conductor geometry was analytically optimized to meet SSC multipole requirements for the ends. The first 1-m dipole utilizing this end geometry has been constructed and successfully tested. Design and construction data are presented. Also model test results, including training and multipole measurements of the end are given. 1 ref., 12 figs., 3 tabs

  8. Mechanical design of the CDF SVX II silicon vertex detector

    International Nuclear Information System (INIS)

    Skarha, J.E.

    1994-08-01

    A next generation silicon vertex detector is planned at CDF for the 1998 Tevatron collider run with the Main Injector. The SVX II silicon vertex detector will allow high luminosity data-taking, enable online triggering of secondary vertex production, and greatly increase the acceptance for heavy flavor physics at CDF. The design specifications, geometric layout, and early mechanical prototyping work for this detector are discussed

  9. Long-term strategies for flood risk management: scenario definition and strategic alternative design

    NARCIS (Netherlands)

    Bruijn, de K.; Klijn, F.; McGahey, C.; Mens, M.; Wolfert, H.P.

    2008-01-01

    This report reviews some mainstream existing methods of scenario development and use, as well as experiences with the design and assessment of strategic alternatives for flood risk management. Next, a procedure and methods are proposed and discussed. Thirdly, the procedure and methods are tried on

  10. Alternative glues for the production of ATLAS silicon strip modules for the Phase-II upgrade of the ATLAS inner detector

    International Nuclear Information System (INIS)

    Poley, Luise; Bloch, Ingo; Edwards, Sam

    2016-04-01

    The Phase-II upgrade of the ATLAS detector for the High Luminosity Large Hadron Collider (HL-LHC) includes the replacement of the current Inner Detector with an all-silicon tracker consisting of pixel and strip detectors. The current Phase-II detector layout requires the construction of 20,000 strip detector modules consisting of sensor, circuit boards and readout chips, which are connected mechanically using adhesives. The adhesive between readout chips and circuit board is a silver epoxy glue as was used in the current ATLAS SemiConductor Tracker (SCT). This glue has several disadvantages, which motivated the search for an alternative. This paper presents a study concerning the use of six ultra-violet (UV) cure glues and a glue pad for use in the assembly of silicon strip detector modules for the ATLAS upgrade. Trials were carried out to determine the ease of use, the thermal conduction and shear strength, thermal cycling, radiation hardness, corrosion resistance and shear strength tests. These investigations led to the exclusion of three UV cure glues as well as the glue pad. Three UV cure glues were found to be possible better alternatives. Results from electrical tests of first prototype modules constructed using these glues are presented.

  11. Alternative glues for the production of ATLAS silicon strip modules for the Phase-II upgrade of the ATLAS inner detector

    Energy Technology Data Exchange (ETDEWEB)

    Poley, Luise [DESY, Zeuthen (Germany); Humboldt Univ. Berlin (Germany); Bloch, Ingo [DESY, Zeuthen (Germany); Edwards, Sam [Birmingham Univ. (United Kingdom); and others

    2016-04-15

    The Phase-II upgrade of the ATLAS detector for the High Luminosity Large Hadron Collider (HL-LHC) includes the replacement of the current Inner Detector with an all-silicon tracker consisting of pixel and strip detectors. The current Phase-II detector layout requires the construction of 20,000 strip detector modules consisting of sensor, circuit boards and readout chips, which are connected mechanically using adhesives. The adhesive between readout chips and circuit board is a silver epoxy glue as was used in the current ATLAS SemiConductor Tracker (SCT). This glue has several disadvantages, which motivated the search for an alternative. This paper presents a study concerning the use of six ultra-violet (UV) cure glues and a glue pad for use in the assembly of silicon strip detector modules for the ATLAS upgrade. Trials were carried out to determine the ease of use, the thermal conduction and shear strength, thermal cycling, radiation hardness, corrosion resistance and shear strength tests. These investigations led to the exclusion of three UV cure glues as well as the glue pad. Three UV cure glues were found to be possible better alternatives. Results from electrical tests of first prototype modules constructed using these glues are presented.

  12. Alternative glues for the production of ATLAS silicon strip modules for the Phase-II upgrade of the ATLAS Inner Detector

    Science.gov (United States)

    Poley, L.; Bloch, I.; Edwards, S.; Friedrich, C.; Gregor, I.-M.; Jones, T.; Lacker, H.; Pyatt, S.; Rehnisch, L.; Sperlich, D.; Wilson, J.

    2016-05-01

    The Phase-II upgrade of the ATLAS detector for the High Luminosity Large Hadron Collider (HL-LHC) includes the replacement of the current Inner Detector with an all-silicon tracker consisting of pixel and strip detectors. The current Phase-II detector layout requires the construction of 20,000 strip detector modules consisting of sensor, circuit boards and readout chips, which are connected mechanically using adhesives. The adhesive used initially between readout chips and circuit board is a silver epoxy glue as was used in the current ATLAS SemiConductor Tracker (SCT). However, this glue has several disadvantages, which motivated the search for an alternative. This paper presents a study of six ultra-violet (UV) cure glues and a glue pad for possible use in the assembly of silicon strip detector modules for the ATLAS upgrade. Trials were carried out to determine the ease of use, thermal conduction and shear strength. Samples were thermally cycled, radiation hardness and corrosion resistance were also determined. These investigations led to the exclusion of three UV cure glues as well as the glue pad. Three UV cure glues were found to be possible better alternatives than silver loaded glue. Results from electrical tests of first prototype modules constructed using these glues are presented.

  13. Alternative glues for the production of ATLAS silicon strip modules for the Phase-II upgrade of the ATLAS Inner Detector

    International Nuclear Information System (INIS)

    Poley, L.; Bloch, I.; Friedrich, C.; Gregor, I.-M.; Edwards, S.; Pyatt, S.; Wilson, J.; Jones, T.; Lacker, H.; Rehnisch, L.; Sperlich, D.

    2016-01-01

    The Phase-II upgrade of the ATLAS detector for the High Luminosity Large Hadron Collider (HL-LHC) includes the replacement of the current Inner Detector with an all-silicon tracker consisting of pixel and strip detectors. The current Phase-II detector layout requires the construction of 20,000 strip detector modules consisting of sensor, circuit boards and readout chips, which are connected mechanically using adhesives. The adhesive used initially between readout chips and circuit board is a silver epoxy glue as was used in the current ATLAS SemiConductor Tracker (SCT). However, this glue has several disadvantages, which motivated the search for an alternative. This paper presents a study of six ultra-violet (UV) cure glues and a glue pad for possible use in the assembly of silicon strip detector modules for the ATLAS upgrade. Trials were carried out to determine the ease of use, thermal conduction and shear strength. Samples were thermally cycled, radiation hardness and corrosion resistance were also determined. These investigations led to the exclusion of three UV cure glues as well as the glue pad. Three UV cure glues were found to be possible better alternatives than silver loaded glue. Results from electrical tests of first prototype modules constructed using these glues are presented.

  14. Incorporating alternative design clinical trials in network meta-analyses

    Directory of Open Access Journals (Sweden)

    Thorlund K

    2014-12-01

    Full Text Available Kristian Thorlund,1–3 Eric Druyts,1,4 Kabirraaj Toor,1,5 Jeroen P Jansen,1,6 Edward J Mills1,3 1Redwood Outcomes, Vancouver, BC, 2Department of Clinical Epidemiology and Biostatistics, McMaster University, Hamilton, ON, Canada; 3Stanford Prevention Research Center, Stanford University, Stanford, CA, USA; 4Department of Medicine, Faculty of Medicine, 5School of Population and Public Health, Faculty of Medicine, University of British Columbia, Vancouver, BC, Canada; 6Department of Public Health and Community Medicine, Tufts University, Boston, MA, USA Introduction: Network meta-analysis (NMA is an extension of conventional pairwise meta-analysis that allows for simultaneous comparison of multiple interventions. Well-established drug class efficacies have become commonplace in many disease areas. Thus, for reasons of ethics and equipoise, it is not practical to randomize patients to placebo or older drug classes. Unique randomized clinical trial designs are an attempt to navigate these obstacles. These alternative designs, however, pose challenges when attempting to incorporate data into NMAs. Using ulcerative colitis as an example, we illustrate an example of a method where data provided by these trials are used to populate treatment networks. Methods: We present the methods used to convert data from the PURSUIT trial into a typical parallel design for inclusion in our NMA. Data were required for three arms: golimumab 100 mg; golimumab 50 mg; and placebo. Golimumab 100 mg induction data were available; however, data regarding those individuals who were nonresponders at induction and those who were responders at maintenance were not reported, and as such, had to be imputed using data from the rerandomization phase. Golimumab 50 mg data regarding responses at week 6 were not available. Existing relationships between the available components were used to impute the expected proportions in this missing subpopulation. Data for placebo maintenance

  15. The PEP-II Project: Low-Energy Ring Design and Project Status

    International Nuclear Information System (INIS)

    Zisman, Michael S.

    2006-01-01

    We describe the present status of the PEP-II project. The project comprises four major systems: Injector, High-Energy Ring (HER), Low-Energy Ring (LER), and Interaction Region (IR). We focus in detail on the design of the LER, as its parameters and requirements are most closely related to those required for the Beijing Tau-Charm Factory rings. The PEP-II LER is a high-current, 3.1-GeV positron ring mounted above the 9-GeV HER. The LER uses a wiggler located in one of its six straight sections to provide emittance control and additional damping. We describe the rather complicated IR, which must transport the LER beam into the plane of the HER, focus it to a common beam size, and separate the beams after the head-on collisions. Both permanent magnet and conventional electromagnets are used in this area. The LER lattice has now adopted a simplified non-interleaved sextupole correction scheme that has reduced the required number of sextupoles substantially. We describe the LER vacuum system, one of the most challenging subsystems in PEP-II. It employs several technologies. In the arcs, aluminum extrusions and titanium sublimation pumps are employed; the straight sections use stainless steel chambers with lumped ion pumps. In the wiggler area, an extended copper photon dump with nonevaporable getter (NEG) pumps is employed to handle the very large synchrotron radiation power. The design of the room-temperature RF system, the bunch-by-bunch longitudinal and transverse feedback systems, and some of the special diagnostics will be described briefly. The PEP-II project remains on schedule to begin commissioning of the HER in April 1997, followed by the LER a year later

  16. Pius II. a utrakvismus

    OpenAIRE

    Šimek, Milan

    2009-01-01

    Milan Šimek Pius II. a utrakvismus Pius II. and utraquism Based on sources work - out, the thesis aims the description and analysis of the attitude alternation of Enea Sylvio Piccolomini - Pius II to the utraquism. The conclusions stress the postulate that Pius II. did not change that attitude, but just did not succed in quelling the utraquist movement. In the sense of political background that finally led to fatal dissention among both leaders, king Jiří of Poděbrady and pope Pius II.

  17. Crafting decision options and alternatives for designing cultural observation system using general morphological modelling

    Directory of Open Access Journals (Sweden)

    Jaber Moghaddampour

    2018-09-01

    Full Text Available According to connoisseurs, cultural system is encountering a fully new space in future decades and cultural indicators will be exposed by some dangers; for the same reason, cultural observation activities in management dialogue of Iran are emphasized; the concept of “observation” in Iran is facing with challenges including being far from the concepts of futures studies and the focus on “cultural indicators monitoring” while cultural engineering needs foresight and identification of affecting progressive and deterring factors on the culture. The present study aims at providing alternatives to design an observation system by considering the monitoring and scanning simultaneously to bring out strategic and futurist vision for cultural organizations. To this end, the solution space and morphological field of observation (parameters and values by using MA/Carma Viewer software package is designed based on the literature review and forming a five-member expert group and specialized conversations. Upon Internal Consistency Assessment of parameters and by considering some values as drivers, Parameters Activity Check was conducted to study the reactions by other parameters and values. After sense-making and proper understanding of the model behavior, an Inference and “What-If” model were devised; some configurations were studied and provided in order to aware a part of proper alternatives for designing a cultural observation system (two scenarios. Scenario selection is different due to contingencies and conditions of executing the process as well as the users’ needs and goals in cultural observation system and cultural organizations can make decisions and design detailed observation systems by using morphological models, solution space and alternatives provided in the present study and depended on their goals and needs.

  18. The EMIL project at BESSY II: Beamline design and performance

    Energy Technology Data Exchange (ETDEWEB)

    Hendel, Stefan, E-mail: stefan.hendel@helmholtz-berlin.de; Schäfers, Franz; Reichardt, Gerd; Scheer, Michael; Bahrdt, Johannes; Lips, Klaus [Helmholtz-Zentrum Berlin für Materialien und Energie GmbH, Albert-Einstein-Straße 15, 12489 Berlin (Germany); Hävecker, Michael [Helmholtz-Zentrum Berlin für Materialien und Energie GmbH, Albert-Einstein-Straße 15, 12489 Berlin (Germany); MPI for Chemical Energy Conversion, Stiftstrasse 34-36, 45470 Mülheim an der Ruhr (Germany)

    2016-07-27

    The Energy Materials In-Situ Laboratory Berlin (EMIL) at BESSY-II is currently under construction. Two canted undulators for soft- and hard X-rays will be installed into the BESSY II storage ring in one straight section, complex beamlines with more than twenty optical elements will be set up and a new laboratory building attached to BESSY II will host three endstations and a large UHV-transfer system connecting various HV- and UHV-deposition systems. The undulators, UE48 and U17, provide a broad energy spectrum of 80 - 10000 eV, of which the harder radiation (>700 eV) is provided by a cryogenic in-vacuum device. Three monochromators (two plane grating monochromators (PGM) and one LN{sub 2}-cooled double crystal monochromator (DCM)) disperse the radiation into separate pathways of 65 m length, while downstream of the monochromators split-mirror chambers distribute the photon beam to one (or simultaneously to two) of five upcoming endstations. Three of these endstations are designed for the full energy range with spatial overlap of the soft and hard foci, whereas one endstation (PEEM) uses only the soft and another one (PINK) only the hard branch, respectively.

  19. 10 CFR Appendix II to Part 504 - Fuel Price Computation

    Science.gov (United States)

    2010-01-01

    ... DEPARTMENT OF ENERGY (CONTINUED) ALTERNATE FUELS EXISTING POWERPLANTS Pt. 504, App. II Appendix II to Part... effects of future real price increases for each fuel. The delivered price of an alternate fuel used to calculate delivered fuel expenses must reflect the petitioner's delivered price of the alternate fuel and...

  20. Topological ferrimagnetic behaviours of coordination polymers containing manganese(II) chains with mixed azide and carboxylate bridges and alternating F/AF/AF'/AF'/AF interactions.

    Science.gov (United States)

    Wang, Yan-Qin; Liu, Hou-Ting; Qi, Yan; Gao, En-Qing

    2014-08-21

    Two Mn(ii) complexes with azide and a new zwitterionic tetracarboxylate ligand 1,2,4,5-tetrakis(4-carboxylatopyridinium-1-methylene)benzene (L(1)), {[Mn5(L(1))2(N3)8(OH)2]·12H2O}n () and {[Mn5(L(1))2(N3)8(H2O)2](ClO4)2·6H2O}n (), have been synthesized and characterized crystallographically and magnetically. and contain similar alternating chains constructed by azide and carboxylate bridges. The independent sets of bridges alternate in an ABCCB sequence between adjacent Mn(ii) ions: (EO-N3)2 double bridges (EO = end-on) (denoted as A), [(EO-N3)(OCO)2] triple bridges (denoted as B) and [(EO-N3)(OCO)] double bridges (denoted as C). The alternating chains are interlinked into 2D coordination networks by the tetrapyridinium spacers. Magnetic studies demonstrate that the magnetic coupling through the double EO azide bridges is ferromagnetic and that through mixed azide/carboxylate bridges is antiferromagnetic. The unprecedented F/AF/AF'/AF'/AF coupling sequence along the chain dictates an uncompensated ground spin state (S = 5/2 per Mn5 unit) and leads to one-dimensional topological ferrimagnetism, which features a minimum in the χT versus T plot.

  1. The ARIES-II and ARIES-IV second-stability tokamak reactors

    International Nuclear Information System (INIS)

    Najmabadi, F.; Conn, R.W.; Hasan, M.Z.; Mau, T.-K.; Sharafat, S.; Baxi, C.B.; Leuer, J.A.; McQuillan, B.W.; Puhn, F.A.; Schultz, K.R.; Wong, C.P.C.; Brooks, J.; Ehst, D.A.; Hassanein, A.; Hua, T.; Hull, A.; Mattis, R.; Picologlou, B.; Sze, D.-K.; Dolan, T.J.; Herring, J.S.; Bathke, C.G.; Krakowski, R.A.; Werley, K.A.; Bromberg, L.; Schultz, J.; Davis, F.; Holmes, J.A.; Lousteau, D.C.; Strickler, D.J.; Jardin, S.C.; Kessel, C.; Snead, L.; Steiner, D.; Valenti, M.; El-Guebaly, L.A.; Emmert, G.A.; Khater, H.Y.; Santarius, J.F.; Sawan, M.; Sviatoslavsky, I.N.; Cheng, E.T.

    1992-01-01

    The ARIES research program is a multi-institutional effort to develop several visions of tokamak reactors with enhanced economic, safety, and environmental features. Four ARIES visions are currently planned for the ARIES program. The ARIES-I design is a DT-burning reactor based on modest extrapolations from the present tokamak physics database and relies on either existing technology or technology for which trends are already in place, often in programs outside fusion. The ARIES-III study focuses on the potential of tokamaks to operate with D- 3 He fuel system as an alternative to deuterium and tritium. The ARIES-II and ARIES-IV designs have the same fusion plasma but different fusion-power-core designs. The ARIES-II reactor uses liquid lithium as the coolant and tritium breeder and vanadium alloy as the structural material in order to study the potential of low-activation metallic blankets. The ARIES-IV reactor uses helium as the coolant, a solid tritium-breeding material, and silicon carbide composite as the structural material in order to achieve the safety and environmental characteristic of fusion. In this paper the authors describe the trade-off leading to the optimum regime of operation for the ARIES-II and ARIES-IV second-stability reactors and review the engineering design of the fusion power cores

  2. Design of the PEP-II Interaction Region Septum Quadrupole

    Science.gov (United States)

    Osborn, J.; Tanabe, J.; Yee, D.; Younger, F.

    1997-05-01

    The PEP-II QF2 magnet is one of the final focus quadrupoles for the Low-Energy Ring (LER) and utilizes a septum aperture to accommodate the adjacent High-Energy Ring (HER) beamline. The LER lattice design specification calls for an extremely high field quality for this magnet. A conventional water-cooled copper coil and laminated steel core design was selected to allow adjustment in the excitation. The close proximity between the LER and HER beamlines and the required integrated quadrupole strength result in a moderately high current density septum design. The QF2 magnets are imbedded in a confined region at each end of the BaBar detector, thus requiring a small magnet core cross section. Pole face windings are included in the QF2 design to buck the skew octupole term induced by the solenoidal fringe field that leaks out of the detector. Back-leg windings are included to buck a small dipole component induced by the lack of perfect quadrupole symmetry in this septum design. 2D pole contour optimization and 3D end chamfers are used to minimize harmonic errors; a separate permanent-magnet Harmonic Corrector Ring compensates for remaining field errors. The design methods and approach, 2D and 3D analyses, and the resulting expected magnet performance are described in this paper.

  3. Alternative Teacher Preparation Programs. Title II News You Can Use

    Science.gov (United States)

    Office of Postsecondary Education, US Department of Education, 2015

    2015-01-01

    Title II of the "Higher Education Act of 1965" ("HEA"), as amended in 2008 by the "Higher Education Opportunity Act," requires states to report annually on key elements of their teacher preparation programs and requirements for initial teacher credentialing, kindergarten through 12th grade. "Title II News You Can…

  4. BOP2: Bayesian optimal design for phase II clinical trials with simple and complex endpoints.

    Science.gov (United States)

    Zhou, Heng; Lee, J Jack; Yuan, Ying

    2017-09-20

    We propose a flexible Bayesian optimal phase II (BOP2) design that is capable of handling simple (e.g., binary) and complicated (e.g., ordinal, nested, and co-primary) endpoints under a unified framework. We use a Dirichlet-multinomial model to accommodate different types of endpoints. At each interim, the go/no-go decision is made by evaluating a set of posterior probabilities of the events of interest, which is optimized to maximize power or minimize the number of patients under the null hypothesis. Unlike other existing Bayesian designs, the BOP2 design explicitly controls the type I error rate, thereby bridging the gap between Bayesian designs and frequentist designs. In addition, the stopping boundary of the BOP2 design can be enumerated prior to the onset of the trial. These features make the BOP2 design accessible to a wide range of users and regulatory agencies and particularly easy to implement in practice. Simulation studies show that the BOP2 design has favorable operating characteristics with higher power and lower risk of incorrectly terminating the trial than some existing Bayesian phase II designs. The software to implement the BOP2 design is freely available at www.trialdesign.org. Copyright © 2017 John Wiley & Sons, Ltd. Copyright © 2017 John Wiley & Sons, Ltd.

  5. Design layout for gas monitoring system II, GMS-2, computer system

    International Nuclear Information System (INIS)

    Vo, V.; Philipp, B.L.; Manke, M.P.

    1995-01-01

    This document provides a general overview of the computer systems software that perform the data acquisition and control for the 241-SY-101 Gas Monitoring System II (GMS-2). It outlines the system layout, and contains descriptions of components and the functions they perform. The GMS-2 system was designed and implemented by Los Alamos National Laboratory and supplied to Westinghouse Hanford Company

  6. An Evaluation of Alternative Designs for a Grid Information Service

    Science.gov (United States)

    Smith, Warren; Waheed, Abdul; Meyers, David; Yan, Jerry; Kwak, Dochan (Technical Monitor)

    2001-01-01

    The Globus information service wasn't working well. There were many updates of data from Globus daemons which saturated the single server and users couldn't retrieve information. We created a second server for NASA and Alliance. Things were great on that server, but a bit slow on the other server. We needed to know exactly how the information service was being used. What were the best servers and configurations? This viewgraph presentation gives an overview of the evaluation of alternative designs for a Grid Information Service. Details are given on the workload characterization, methodology used, and the performance evaluation.

  7. Modernization design of neutron radiography of ITU TRIGA Mark-II reactor

    International Nuclear Information System (INIS)

    Tugrul, B.; Bilge, A.N.

    1988-01-01

    ITU TRIGA MARK-II Research and Training Reactor has a power of 250 KW and has three beam tubes. One of them is tangential beam tube used for neutron radiography. In this study, the neutron radiography set in the tangential beam tube is described with its problems for ITU TRIGA Reactor. After that modernization of the system is designed and the applicability of the direct and indirect methods is evaluated. Improving the ratio of length to diameter for the beam tube, elimination the fogging on the film and constructive design for practice and secure application of the technique is developed. (author)

  8. Computational tools and lattice design for the PEP-II B-Factory

    International Nuclear Information System (INIS)

    Cai Yunhai; Irwin, John; Nosochkov, Yuri; Yan, Yiton

    1997-01-01

    Several accelerator codes were used to design the PEP-II lattices, ranging from matrix-based codes, such as MAD and DIMAD, to symplectic-integrator codes, such as TRACY and DESPOT. In addition to element-by-element tracking, we constructed maps to determine aberration strengths. Furthermore, we have developed a fast and reliable method (nPB tracking) to track particles with a one-turn map. This new technique allows us to evaluate performance of the lattices on the entire tune-plane. Recently, we designed and implemented an object-oriented code in C++ called LEGO which integrates and expands upon TRACY and DESPOT

  9. Photosystem II cycle activity and alternative electron transport in the diatom Phaeodactylum tricornutum under dynamic light conditions and nitrogen limitation.

    Science.gov (United States)

    Wagner, Heiko; Jakob, Torsten; Lavaud, Johann; Wilhelm, Christian

    2016-05-01

    Alternative electron sinks are an important regulatory mechanism to dissipate excessively absorbed light energy particularly under fast changing dynamic light conditions. In diatoms, the cyclic electron transport (CET) around Photosystem II (PS II) is an alternative electron transport pathway (AET) that contributes to avoidance of overexcitation under high light illumination. The combination of nitrogen limitation and high-intensity irradiance regularly occurs under natural conditions and is expected to force the imbalance between light absorption and the metabolic use of light energy. The present study demonstrates that under N limitation, the amount of AET and the activity of CETPSII in the diatom Phaeodactylum tricornutum were increased. Thereby, the activity of CETPSII was linearly correlated with the amount of AET rates. It is concluded that CETPSII significantly contributes to AET in P. tricornutum. Surprisingly, CETPSII was found to be activated already at the end of the dark period under N-limited conditions. This coincided with a significantly increased degree of reduction of the plastoquinone (PQ) pool. The analysis of the macromolecular composition of cells of P. tricornutum under N-limited conditions revealed a carbon allocation in favor of carbohydrates during the light period and their degradation during the dark phase. A possible linkage between the activity of CETPSII and degree of reduction of the PQ pool on the one side and the macromolecular changes on the other is discussed.

  10. Tritium handling, breeding, and containment in two conceptual fusion reactor designs: UWMAK-II and UWMAK-III

    International Nuclear Information System (INIS)

    Clemmer, R.G.; Larsen, E.M.

    1976-01-01

    Tritium is an essential component of near-term controlled thermonuclear reactor systems. Since tritium is not likely to be available on a large scale at a modest cost, fusion reactor designs must incorporate blanket systems which will be capable of breeding tritium. Because of the radiological activity and capability of assimilation into living tissues, tritium release to the environment must be strictly controlled. The University of Wisconsin has completed three conceptual designs of fusion reactors, UWMAK-I, UWMAK-II, and UWMAK-III. This report discusses the tritium systems for UWMAK-II, a reactor design with a helium cooled solid breeder blanket, and UWMAK-III, a reactor design with a high-temperature liquid breeder blanket. Tritium systems for fueling and recycling, breeding and recovery, and plant containment and control are discussed. (Auth.)

  11. Intermediate heat exchanger and steam generator designs for the HYLIFE-II fusion power plant using molten salts

    International Nuclear Information System (INIS)

    Lee, Y.T.; Hoffman, M.A.

    1992-01-01

    The HYLIFE-II fusion power plant employs the molten salt, Flibe, for the liquid jets which form the self-healing 'first wall' of the reactor. The molten salt, sodium fluoroborate then transports the heat from the IHX's to the steam generators. The design and optimization of the IHX's and the steam generators for use with molten salts has been done as part of the HYLIFE-II conceptual design study. The results of this study are described, and reference designs of these large heat exchangers are selected to minimize the cost of electricity while satisfying other important constraints

  12. Clinical utility of the DSM-5 alternative model for borderline personality disorder: Differential diagnostic accuracy of the BFI, SCID-II-PQ, and PID-5.

    Science.gov (United States)

    Fowler, J Christopher; Madan, Alok; Allen, Jon G; Patriquin, Michelle; Sharp, Carla; Oldham, John M; Frueh, B Christopher

    2018-01-01

    With the publication of DSM 5 alternative model for personality disorders it is critical to assess the components of the model against evidence-based models such as the five factor model and the DSM-IV-TR categorical model. This study explored the relative clinical utility of these models in screening for borderline personality disorder (BPD). Receiver operator characteristics and diagnostic efficiency statistics were calculated for three personality measures to ascertain the relative diagnostic efficiency of each measure. A total of 1653 adult inpatients at a specialist psychiatric hospital completed SCID-II interviews. Sample 1 (n=653) completed the SCID-II interviews, SCID-II Questionnaire (SCID-II-PQ) and the Big Five Inventory (BFI), while Sample 2 (n=1,000) completed the SCID-II interviews, Personality Inventory for DSM5 (PID-5) and the BFI. BFI measure evidenced moderate accuracy for two composites: High Neuroticism+ low agreeableness composite (AUC=0.72, SE=0.01, ptrait constellation for diagnosing BPD. Limitations of the study include the single inpatient setting and use of two discrete samples to assess PID-5 and SCID-II-PQ. Copyright © 2017 Elsevier Inc. All rights reserved.

  13. Design guide for category II reactors light and heavy water cooled reactors

    International Nuclear Information System (INIS)

    Brynda, W.J.; Lobner, P.R.; Powell, R.W.; Straker, E.A.

    1978-05-01

    The Department of Energy (DOE), in the ERDA Manual, requires that all DOE-owned reactors be sited, designed, constructed, modified, operated, maintained, and decommissioned in a manner that gives adequate consideration to health and safety factors. Specific guidance pertinent to the safety of DOE-owned reactors is found in Chapter 0540 of the ERDA Manual. The purpose of this Design Guide is to provide additional guidance to aid the DOE facility contractor in meeting the requirement that the siting, design, construction, modification operation, maintainance, and decommissioning of DOW-owned reactors be in accordance with generally uniform standards, guide and codes which are comparable to those applied to similar reactors licensed by the Nuclear Regulatory Commission (NRC). This Design Guide deals principally with the design and functional requirements of Category II reactor structure, components, and systems

  14. Shark class II invariant chain reveals ancient conserved relationships with cathepsins and MHC class II.

    Science.gov (United States)

    Criscitiello, Michael F; Ohta, Yuko; Graham, Matthew D; Eubanks, Jeannine O; Chen, Patricia L; Flajnik, Martin F

    2012-03-01

    The invariant chain (Ii) is the critical third chain required for the MHC class II heterodimer to be properly guided through the cell, loaded with peptide, and expressed on the surface of antigen presenting cells. Here, we report the isolation of the nurse shark Ii gene, and the comparative analysis of Ii splice variants, expression, genomic organization, predicted structure, and function throughout vertebrate evolution. Alternative splicing to yield Ii with and without the putative protease-protective, thyroglobulin-like domain is as ancient as the MHC-based adaptive immune system, as our analyses in shark and lizard further show conservation of this mechanism in all vertebrate classes except bony fish. Remarkable coordinate expression of Ii and class II was found in shark tissues. Conserved Ii residues and cathepsin L orthologs suggest their long co-evolution in the antigen presentation pathway, and genomic analyses suggest 450 million years of conserved Ii exon/intron structure. Other than an extended linker preceding the thyroglobulin-like domain in cartilaginous fish, the Ii gene and protein are predicted to have largely similar physiology from shark to man. Duplicated Ii genes found only in teleosts appear to have become sub-functionalized, as one form is predicted to play the same role as that mediated by Ii mRNA alternative splicing in all other vertebrate classes. No Ii homologs or potential ancestors of any of the functional Ii domains were found in the jawless fish or lower chordates. Copyright © 2011 Elsevier Ltd. All rights reserved.

  15. Crossbar H-mode drift-tube linac design with alternative phase focusing for muon linac

    Science.gov (United States)

    Otani, M.; Futatsukawa, K.; Hasegawa, K.; Kitamura, R.; Kondo, Y.; Kurennoy, S.

    2017-07-01

    We have developed a Crossbar H-mode (CH) drift-tube linac (DTL) design with an alternative phase focusing (APF) scheme for a muon linac, in order to measure the anomalous magnetic moment and electric dipole moment (EDM) of muons at the Japan Proton Accelerator Research Complex (J-PARC). The CH-DTL accelerates muons from β = v/c = 0.08 to 0.28 at an operational frequency of 324 MHz. The design and results are described in this paper.

  16. Finding Sums for an Infinite Class of Alternating Series

    Science.gov (United States)

    Chen, Zhibo; Wei, Sheng; Xiao, Xuerong

    2012-01-01

    Calculus II students know that many alternating series are convergent by the Alternating Series Test. However, they know few alternating series (except geometric series and some trivial ones) for which they can find the sum. In this article, we present a method that enables the students to find sums for infinitely many alternating series in the…

  17. A note on “An alternative multiple attribute decision making methodology for solving optimal facility layout design selection problems”

    OpenAIRE

    R. Venkata Rao

    2012-01-01

    A paper published by Maniya and Bhatt (2011) (An alternative multiple attribute decision making methodology for solving optimal facility layout design selection problems, Computers & Industrial Engineering, 61, 542-549) proposed an alternative multiple attribute decision making method named as “Preference Selection Index (PSI) method” for selection of an optimal facility layout design. The authors had claimed that the method was logical and more appropriate and the method gives directly the o...

  18. Alternative Ultrasound Gel for a Sustainable Ultrasound Program: Application of Human Centered Design.

    Directory of Open Access Journals (Sweden)

    Margaret Salmon

    Full Text Available This paper describes design of a low cost, ultrasound gel from local products applying aspects of Human Centered Design methodology. A multidisciplinary team worked with clinicians who use ultrasound where commercial gel is cost prohibitive and scarce. The team followed the format outlined in the Ideo Took Kit. Research began by defining the challenge "how to create locally available alternative ultrasound gel for a low-resourced environment? The "End-Users," were identified as clinicians who use ultrasound in Democratic Republic of the Congo and Ethiopia. An expert group was identified and queried for possible alternatives to commercial gel. Responses included shampoo, oils, water and cornstarch. Cornstarch, while a reasonable solution, was either not available or too expensive. We then sought deeper knowledge of locally sources materials from local experts, market vendors, to develop a similar product. Suggested solutions gleaned from these interviews were collected and used to create ultrasound gel accounting for cost, image quality, manufacturing capability. Initial prototypes used cassava root flour from Great Lakes Region (DRC, Rwanda, Uganda, Tanzania and West Africa, and bula from Ethiopia. Prototypes were tested in the field and resulting images evaluated by our user group. A final prototype was then selected. Cassava and bula at a 32 part water, 8 part flour and 4 part salt, heated, mixed then cooled was the product design of choice.

  19. Alternative Ultrasound Gel for a Sustainable Ultrasound Program: Application of Human Centered Design.

    Science.gov (United States)

    Salmon, Margaret; Salmon, Christian; Bissinger, Alexa; Muller, Mundenga Mutendi; Gebreyesus, Alegnta; Geremew, Haimanot; Wendel, Sarah K; Wendell, Sarah; Azaza, Aklilu; Salumu, Maurice; Benfield, Nerys

    2015-01-01

    This paper describes design of a low cost, ultrasound gel from local products applying aspects of Human Centered Design methodology. A multidisciplinary team worked with clinicians who use ultrasound where commercial gel is cost prohibitive and scarce. The team followed the format outlined in the Ideo Took Kit. Research began by defining the challenge "how to create locally available alternative ultrasound gel for a low-resourced environment? The "End-Users," were identified as clinicians who use ultrasound in Democratic Republic of the Congo and Ethiopia. An expert group was identified and queried for possible alternatives to commercial gel. Responses included shampoo, oils, water and cornstarch. Cornstarch, while a reasonable solution, was either not available or too expensive. We then sought deeper knowledge of locally sources materials from local experts, market vendors, to develop a similar product. Suggested solutions gleaned from these interviews were collected and used to create ultrasound gel accounting for cost, image quality, manufacturing capability. Initial prototypes used cassava root flour from Great Lakes Region (DRC, Rwanda, Uganda, Tanzania) and West Africa, and bula from Ethiopia. Prototypes were tested in the field and resulting images evaluated by our user group. A final prototype was then selected. Cassava and bula at a 32 part water, 8 part flour and 4 part salt, heated, mixed then cooled was the product design of choice.

  20. Directions for attractive tokamak reactors: The ARIES-II and ARIES-IV second-stability designs

    International Nuclear Information System (INIS)

    Najmabadi, F.; Conn, R.W.

    1993-01-01

    ARIES is a research program to develop several visions of tokamak reactors with enhanced economic, safety, and environmental features. The ARIES study has developed four visions for tokamaks. All four designs are steady-state, 1000-MWe (net) power reactors. The ARIES-II and ARIES-IV designs assume potential advances in plasma physics (such as second-stability operation) predicted by theory but not yet established experimentally. The two designs have the same fusion plasma but different fusion-power-core. There are only minor differences between the ARIES-II and ARIES-IV plasma parameters. ARIES-IV is a 1000-MWe reactor with an average neutron wall loading of 3 MW/m 2 , and a mass power density of about 120 kWe/tonne of fusion power core. The reactor major radius is 6.1 m, the plasma minor radius is 1.5 m and the plasma elongation is 2, and the plasma triangularity is 0.67. The plasma current is low (6.8 MA), B on-axis is 7.7 T (corresponding to a maximum field at the coil of 16T), and the toroidal beta is 3.4% (Troyon coefficient = 6). The operating regime is optimized such that most of the plasma current (∼ 90%) is provided by the bootstrap current. ARIES-II uses liquid lithium as the coolant and tritium breeder. V-5Cr-5Ti is used as the structural material so that the potential of low-activation metallic blankets can be studied. ARIES-IV uses helium as the coolant, a solid tritium-breeding material (Li 2 O), and silicon carbide composite as structural material. The waste produced by neutron activation in both designs is found to meet the criteria allowing shallow-land burial under U.S. regulations. The cost of electricity for the ARIES-II-IV class of reactors is estimated to be about 20% lower than comparable, steady-state first-stability reactors (e.g. ARIES-I). 25 refs, 2 figs, 1 tab

  1. Human factors in design modifications: panel alternative stop in Almaraz

    International Nuclear Information System (INIS)

    Roman, Y.; Bote, J.

    2015-01-01

    Human Factors Engineering has acquired a crucial role in the development of any design modification (DM), where every aspect relative to any interaction with the human user has to be taken into account at any stage thereof. Considering this, during the last years, Almaraz Nuclear Powe Plants has developed a program of Human Factors Engineering in order to reach the internationally recognized standards or systematic collected on NUREG 0711 Human Factors Engineering Program Review Model (NRC). One of the most important projects of this program at Almaraz Nuclear Power Plant has been the implementation of the Alternative Stop Panel and their corresponding Transfer Panels. (Author)

  2. Computational tools and lattice design for the PEP-II B-Factory

    International Nuclear Information System (INIS)

    Cai, Y.; Irwin, J.; Nosochkov, Y.; Yan, Y.

    1997-01-01

    Several accelerator codes were used to design the PEP-II lattices, ranging from matrix-based codes, such as MAD and DIMAD, to symplectic-integrator codes, such as TRACY and DESPOT. In addition to element-by-element tracking, we constructed maps to determine aberration strengths. Furthermore, we have developed a fast and reliable method (nPB tracking) to track particles with a one-turn map. This new technique allows us to evaluate performance of the lattices on the entire tune-plane. Recently, we designed and implemented an object-oriented code in C++ called LEGO which integrates and expands upon TRACY and DESPOT. copyright 1997 American Institute of Physics

  3. An alternative design for a metal image slicing IFU for EAGLE

    Science.gov (United States)

    Dubbeldam, Cornelis M.; Robertson, David J.; Rolt, Stephen; Talbot, R. Gordon

    2012-09-01

    The Centre for Advanced Instrumentation (CfAI) of Durham University (UK) has developed a conceptual design for the Integral Field Unit (IFU) for EAGLE based on diamond-machined monolithic multi-faceted metal-mirror arrays as an alternative to the glass IFU which is currently baselined. The CfAI has built up substantial expertise with the design, manufacture, integration, alignment and acceptance testing of such systems, through the successful development of IFUs for the Gemini Near-InfraRed Spectrograph (GNIRS) and JWST NIRSpec and 24 IFUs for ESO’s K-band Multi-Object Spectrometer (KMOS). The unprecedented performance of the KMOS IFUs (Strehl risks and cost. Through the timely completion of the KMOS IFUs, which required the fabrication of an unprecedented 1152 optical surfaces, the CfAI have demonstrated that they have the capacity to produce the required volume within reasonable schedule constraints. All the facilities (design, fabrication e.g. diamond machining, metrology, integration and test) required for the successful realisation of such systems are available in-house, thus minimising programmatic risks. This paper presents the opto-mechanical design and predicted performance (based on the actual measured performance of the KMOS IFUs) of the proposed metal IFU.

  4. Controlled air incinerator for radioactive waste. Volume II. Engineering design references manual

    International Nuclear Information System (INIS)

    Koenig, R.A.; Draper, W.E.; Newmyer, J.M.; Warner, C.L.

    1982-11-01

    This two-volume report is a detailed design and operating documentation of the Los Alamos National Laboratory Controlled Air Incinerator (CAI) and is an aid to technology transfer to other Department of Energy contractor sites and the commercial sector. Volume I describes the CAI process, equipment, and performance, and it recommends modifications based on Los Alamos experience. It provides the necessary information for conceptual design and feasibility studies. Volume II provides descriptive engineering information such as drawings, specifications, calculations, and costs. It aids duplication of the process at other facilities

  5. AgIIS, Agricultural Irrigation Imaging System, design and application

    Science.gov (United States)

    Haberland, Julio Andres

    Remote sensing is a tool that is increasingly used in agriculture for crop management purposes. A ground-based remote sensing data acquisition system was designed, constructed, and implemented to collect high spatial and temporal resolution data in irrigated agriculture. The system was composed of a rail that mounts on a linear move irrigation machine, and a small cart that runs back and forth on the rail. The cart was equipped with a sensors package that measured reflectance in four discrete wavelengths (550 nm, 660 nm, 720 nm, and 810 nm, all 10 nm bandwidth) and an infrared thermometer. A global positioning system and triggers on the rail indicated cart position. The data was postprocessed in order to generate vegetation maps, N and water status maps and other indices relevant for site-specific crop management. A geographic information system (GIS) was used to generate images of the field on any desired day. The system was named AgIIS (A&barbelow;gricultural I&barbelow;rrigation I&barbelow;maging S&barbelow;ystem). This ground based remote sensing acquisition system was developed at the Agricultural and Biosystems Engineering Department at the University of Arizona in conjunction with the U.S. Water Conservation Laboratory in Phoenix, as part of a cooperative study primarily funded by the Idaho National Environmental and Engineering Laboratory. A second phase of the study utilized data acquired with AgIIS during the 1999 cotton growing season to model petiole nitrate (PNO3 -) and total leaf N. A latin square experimental design with optimal and low water and optimal and low N was used to evaluate N status under water and no water stress conditions. Multivariable models were generated with neural networks (NN) and multilinear regression (MLR). Single variable models were generated from chlorophyll meter readings (SPAD) and from the Canopy Chlorophyll Content Index (CCCI). All models were evaluated against observed PNO3- and total leaf N levels. The NN models

  6. Design study of a plasma-loaded CRM using TPD-II machine

    International Nuclear Information System (INIS)

    Minami, Kazuo

    2007-08-01

    Design study of an experiment for plasma-loaded cyclotron resonance maser (CRM) utilizing TPD-II Machine at NIFS, Japan is described in some detail. The principle of gyrotrons has been believed the CRM instability. However, all the existing linear theories of CRM instability include unphysical modes unstable at infinite values of axial wavenumber that can never be observed experimentally. To overcome the difficulty, we derive and analyze numerically an exact linear dispersion relation of a large orbit electron beam for CRM, and removed the unphysical modes. However, the relation is found to include two principles of cyclotron emission with oscillation frequencies above and below the branch of fast electron cyclotron wave. The former is CRM instability, and the latter is named Chrenkov instability in the azimuthal direction (CIAD). It is noted that the CIAD we found remains only a proposal of a new mechanism for cyclotron emission until the physical existence is verified experimentally. To verify the CIAD, the design study of a plasma-loaded CRM has been carried out. The apparatus consists of two portions installed in the TPD-II: A pair of helical wiggler windings to create a mono-energetic beam with 15 keV and pitch factor V θ /V z ≥1, and microwave circuits including a cylindrical TE 011 mode cavity with resonant frequency 3.45 GHz. For high plasma density n≥1.5x10 11 cm -3 from TPD-II, the CRM instability may be suppressed and the CIAD will take turn. The present experimental study contributes to a deeper understanding and a widened future prospect in gyrotron physics. (author)

  7. Pecan nutshell as biosorbent to remove Cu(II), Mn(II) and Pb(II) from aqueous solutions.

    Science.gov (United States)

    Vaghetti, Julio C P; Lima, Eder C; Royer, Betina; da Cunha, Bruna M; Cardoso, Natali F; Brasil, Jorge L; Dias, Silvio L P

    2009-02-15

    In the present study we reported for the first time the feasibility of pecan nutshell (PNS, Carya illinoensis) as an alternative biosorbent to remove Cu(II), Mn(II) and Pb(II) metallic ions from aqueous solutions. The ability of PNS to remove the metallic ions was investigated by using batch biosorption procedure. The effects such as, pH, biosorbent dosage on the adsorption capacities of PNS were studied. Four kinetic models were tested, being the adsorption kinetics better fitted to fractionary-order kinetic model. Besides that, the kinetic data were also fitted to intra-particle diffusion model, presenting three linear regions, indicating that the kinetics of adsorption should follow multiple sorption rates. The equilibrium data were fitted to Langmuir, Freundlich, Sips and Redlich-Peterson isotherm models. Taking into account a statistical error function, the data were best fitted to Sips isotherm model. The maximum biosorption capacities of PNS were 1.35, 1.78 and 0.946mmolg(-1) for Cu(II), Mn(II) and Pb(II), respectively.

  8. Complementary and alternative therapies for back pain II.

    NARCIS (Netherlands)

    Furlan, Andrea D.; Yazdi, Fatemeh; Tsertsvadze, Alexander; Gross, Anita; Van Tulder, Maurits; Santaguida, Lina; Cherkin, Dan; Gagnier, Joel J.; Ammendolia, Carlo; Ansari, Mohammed T.; Ostermann, Thomas; Dryden, Trish; Doucette, Steve; Skidmore, Becky; Daniel, Raymond; Tsouros, Sophia; Weeks, Laura; Galipeau, James

    2010-01-01

    Back and neck pain are important health problems with serious societal and economic implications. Conventional treatments have been shown to have limited benefit in improving patient outcomes. Complementary and Alternative Medicine (CAM) therapies offer additional options in the management of low

  9. Designing a suitable alternative to oil-based mud

    International Nuclear Information System (INIS)

    Holgate, M.; Irwin, G.; Cousins, L.

    1991-01-01

    This paper reports on wireline logging problems which have plagued the reservoir section of development wells in Welton oil field in the East Midlands area of England. And resulting incomplete or poor-quality logging data spurred a look at ways of improving hole conditions. Oil-based muds often are seen as the ideal solution, but they are expensive. Their use also commits the operator to additional costs from safeguarding personnel and limiting environmental impact. Such expense was initiated to develop a cheaper, more environmentally friendly, water-based alternative. A wide-ranging review was carried out to determine the most cost-effective options to obtain reservoir information. This included an examination of lithology, casing design, bit selection, hydraulics, logging requirements and techniques, and development of a suitable water-based mud. This holistic approach was seen as the most effective method of avoiding use of oil-based mud. After successful experimentation, a water-based mud was used in subsequent wells at Welton. A high-salt mud system and the drilling principles discussed here produced significant improvement in hole conditions. Application of a holistic approach led to many operational improvements. For instance, the casing shoe was deepened to case off the most troublesome zone in the local Edlington formation. There also was a better awareness of alternative logging techniques, the commercial factors that influenced their use and their operational and technical limitations. Logging problems were reduced but not eliminated. Where there were problems, application of improved techniques minimized their impact. Last, but not least, there was an unexpected spin-off in that the bit chosen to reduce hole erosion also reduced the time taken to drill the section

  10. Preliminary Evaluation of Alternate Designs for HFIR Low-Enriched Uranium Fuel

    Energy Technology Data Exchange (ETDEWEB)

    Renfro, David [ORNL; Chandler, David [ORNL; Cook, David [ORNL; Ilas, Germina [ORNL; Jain, Prashant [ORNL; Valentine, Jennifer [ORNL

    2014-10-30

    Engineering design studies of the feasibility of conversion of the High Flux Isotope Reactor (HFIR) from high-enriched uranium (HEU) to low-enriched uranium (LEU) fuel are ongoing at Oak Ridge National Laboratory (ORNL) as part of an effort sponsored by the U.S. Department of Energy’s Global Threat Reduction Initiative (GTRI)/Reduced Enrichment for Research and Test Reactors (RERTR) program. The fuel type selected by the program for the conversion of the five high-power research reactors in the U.S. that still use HEU fuel is a new U-Mo monolithic fuel. Studies by ORNL have previously indicated that HFIR can be successfully converted using the new fuel provided (1) the reactor power can be increased from 85 MW to 100 MW and (2) the fuel can be fabricated to a specific reference design. Fabrication techniques for the new fuel are under development by the program but are still immature, especially for the “complex” aspects of the HFIR fuel design. In FY 2012, the program underwent a major shift in focus to emphasize developing and qualifying processes for the fabrication of reliable and affordable LEU fuel. In support of this new focus and in an effort to ensure that the HFIR fuel design is as suitable for reliable fabrication as possible, ORNL undertook the present study to propose and evaluate several alternative design features. These features include (1) eliminating the fuel zone axial contouring in the previous reference design by substituting a permanent neutron absorber in the lower unfueled region of all of the fuel plates, (2) relocating the burnable neutron absorber from the fuel plates of the inner fuel element to the side plates of the inner fuel element (the fuel plates of the outer fuel element do not contain a burnable absorber), (3) relocating the fuel zone inside the fuel plate to be centered on the centerline of the depth of the plate, and (4) reshaping the radial contour of the relocated fuel zone to be symmetric about this centerline. The

  11. Preliminary Evaluation of Alternate Designs for HFIR Low-Enriched Uranium Fuel

    Energy Technology Data Exchange (ETDEWEB)

    Renfro, David G [ORNL; Chandler, David [ORNL; Cook, David Howard [ORNL; Ilas, Germina [ORNL; Jain, Prashant K [ORNL; Valentine, Jennifer R [ORNL

    2014-11-01

    Engineering design studies of the feasibility of conversion of the High Flux Isotope Reactor (HFIR) from high-enriched uranium (HEU) to low-enriched uranium (LEU) fuel are ongoing at Oak Ridge National Laboratory (ORNL) as part of an effort sponsored by the U.S. Department of Energy s Global Threat Reduction Initiative (GTRI)/Reduced Enrichment for Research and Test Reactors (RERTR) program. The fuel type selected by the program for the conversion of the five high-power research reactors in the U.S. that still use HEU fuel is a new U-Mo monolithic fuel. Studies by ORNL have previously indicated that HFIR can be successfully converted using the new fuel provided (1) the reactor power can be increased from 85 MW to 100 MW and (2) the fuel can be fabricated to a specific reference design. Fabrication techniques for the new fuel are under development by the program but are still immature, especially for the complex aspects of the HFIR fuel design. In FY 2012, the program underwent a major shift in focus to emphasize developing and qualifying processes for the fabrication of reliable and affordable LEU fuel. In support of this new focus and in an effort to ensure that the HFIR fuel design is as suitable for reliable fabrication as possible, ORNL undertook the present study to propose and evaluate several alternative design features. These features include (1) eliminating the fuel zone axial contouring in the previous reference design by substituting a permanent neutron absorber in the lower unfueled region of all of the fuel plates, (2) relocating the burnable neutron absorber from the fuel plates of the inner fuel element to the side plates of the inner fuel element (the fuel plates of the outer fuel element do not contain a burnable absorber), (3) relocating the fuel zone inside the fuel plate to be centered on the centerline of the depth of the plate, and (4) reshaping the radial contour of the relocated fuel zone to be symmetric about this centerline. The present

  12. An alternative design of reference blocks during the ultrasonic of ferritic welded joints

    International Nuclear Information System (INIS)

    Rondon Torriente, S.; Galeano Alvarez, N.J.

    1996-01-01

    This paper describes an alternative design which can be used to construct the reference blocks required to make the sensibility adjustment during the ultrasonic control ferritic welded joints. The major possibilities of this design are seen when it's used together with the well known AVG method, however it can be properly used with the reference block technique. In addition, the most general facts to keep in mind during the construction of this means are outlined, and besides advantages and problems involved with the use of some basics reference reflectors of wide spread use. Also formulates are given that can be used to obtain the size of the disk shaped reflector corresponding to the basics reference reflectors that this design includes

  13. Value engineering on the designed operator work tools for brick and rings wells production

    Science.gov (United States)

    Ayu Bidiawati J., R.; Muchtiar, Yesmizarti; Wariza, Ragil Okta

    2017-06-01

    Operator working tools in making brick and ring wells were designed and made, and the value engineering was calculated to identify and develop the function of these tools in obtaining the balance between cost, reliability and appearance. This study focused on the value of functional components of the tools and attempted to increase the difference between the costs incurred by the generated values. The purpose of this study was to determine the alternatives of tools design and to determine the performance of each alternative. The technique was developed using FAST method that consisted of five stages: information, creative, analytical, development and presentation stage. The results of the analysis concluded that the designed tools have higher value and better function description. There were four alternative draft improvements for operator working tools. The best alternative was determined based on the rank by using matrix evaluation. Best performance was obtained by the alternative II, amounting to 98.92 with a value of 0.77.

  14. LCLS-II 1.3 GHz cryomodule design - lessons learned from testing at Fermilab

    Science.gov (United States)

    Kaluzny, J.; Hurd, J.; Orlov, Y.; He, Y.; Bossert, R.; Grimm, C.; Schappert, W.; Atassi, O. Al; Wang, R.; Arkan, T.; Theilacker, J.; Klebaner, A.; White, M.; Wu, G.; Makara, J.; Ginsburg, C.; Pei, L.; Holzbauer, J.; Hansen, B.; Stanek, R.; Peterson, T.; Harms, E.

    2017-12-01

    Fermilab’s 1.3 GHz prototype cryomodule for the Linac Coherent Light Source Upgrade (LCLS-II) has been tested at Fermilab’s Cryomodule Test Facility (CMTF). Aspects of the cryomodule design have been studied and tested. The cooldown circuit was used to quickly cool the cavities through the transition temperature, and a heater on the circuit was used to heat incoming helium for warmup. Due to the 0.5% slope of the cryomodule, the liquid level is not constant along the length of the cryomodule. This slope as well as the pressure profile caused liquid level management to be a challenge. The microphonics levels in the cryomodule were studied and efforts were made to reduce them throughout testing. Some of the design approaches and studies performed on these aspects will be presented. Fermilab is operated by Fermi Research Alliance, LLC under Contract No. De-AC02-07CH11359 with the United States Department of Energy. This work was supported, in part, by the LCLS-II Project.

  15. A Alternative Analog Circuit Design Methodology Employing Integrated Artificial Intelligence Techniques

    Science.gov (United States)

    Tuttle, Jeffery L.

    In consideration of the computer processing power now available to the designer, an alternative analog circuit design methodology is proposed. Computer memory capacities no longer require the reduction of the transistor operational characteristics to an imprecise formulation. Therefore, it is proposed that transistor modelling be abandoned in favor of fully characterized transistor data libraries. Secondly, availability of the transistor libraries would facilitate an automated selection of the most appropriate device(s) for the circuit being designed. More specifically, a preprocessor computer program to a more sophisticated circuit simulator (e.g. SPICE) is developed to assist the designer in developing the basic circuit topology and the selection of the most appropriate transistor. Once this is achieved, the circuit topology and selected transistor data library would be downloaded to the simulator for full circuit operational characterization and subsequent design modifications. It is recognized that the design process is enhanced by the use of heuristics as applied to iterative design results. Accordingly, an artificial intelligence (AI) interface is developed to assist the designer in applying the preprocessor results. To demonstrate the retrofitability of the AI interface to established programs, the interface is specifically designed to be as non-intrusive to the host code as possible. Implementation of the proposed methodology offers the potential to speed the design process, since the preprocessor both minimizes the required number of simulator runs and provides a higher acceptance potential of the initial and subsequent simulator runs. Secondly, part count reductions may be realizable since the circuit topologies are not as strongly driven by transistor limitations. Thirdly, the predicted results should more closely match actual circuit operations since the inadequacies of the transistor models have been virtually eliminated. Finally, the AI interface

  16. Screened selection design for randomised phase II oncology trials: an example in chronic lymphocytic leukaemia.

    Science.gov (United States)

    Yap, Christina; Pettitt, Andrew; Billingham, Lucinda

    2013-07-03

    As there are limited patients for chronic lymphocytic leukaemia trials, it is important that statistical methodologies in Phase II efficiently select regimens for subsequent evaluation in larger-scale Phase III trials. We propose the screened selection design (SSD), which is a practical multi-stage, randomised Phase II design for two experimental arms. Activity is first evaluated by applying Simon's two-stage design (1989) on each arm. If both are active, the play-the-winner selection strategy proposed by Simon, Wittes and Ellenberg (SWE) (1985) is applied to select the superior arm. A variant of the design, Modified SSD, also allows the arm with the higher response rates to be recommended only if its activity rate is greater by a clinically-relevant value. The operating characteristics are explored via a simulation study and compared to a Bayesian Selection approach. Simulations showed that with the proposed SSD, it is possible to retain the sample size as required in SWE and obtain similar probabilities of selecting the correct superior arm of at least 90%; with the additional attractive benefit of reducing the probability of selecting ineffective arms. This approach is comparable to a Bayesian Selection Strategy. The Modified SSD performs substantially better than the other designs in selecting neither arm if the underlying rates for both arms are desirable but equivalent, allowing for other factors to be considered in the decision making process. Though its probability of correctly selecting a superior arm might be reduced, it still performs reasonably well. It also reduces the probability of selecting an inferior arm. SSD provides an easy to implement randomised Phase II design that selects the most promising treatment that has shown sufficient evidence of activity, with available R codes to evaluate its operating characteristics.

  17. Critical appraisal of arguments for the delayed-start design proposed as alternative to the parallel-group randomized clinical trial design in the field of rare disease.

    Science.gov (United States)

    Spineli, Loukia M; Jenz, Eva; Großhennig, Anika; Koch, Armin

    2017-08-17

    A number of papers have proposed or evaluated the delayed-start design as an alternative to the standard two-arm parallel group randomized clinical trial (RCT) design in the field of rare disease. However the discussion is felt to lack a sufficient degree of consideration devoted to the true virtues of the delayed start design and the implications either in terms of required sample-size, overall information, or interpretation of the estimate in the context of small populations. To evaluate whether there are real advantages of the delayed-start design particularly in terms of overall efficacy and sample size requirements as a proposed alternative to the standard parallel group RCT in the field of rare disease. We used a real-life example to compare the delayed-start design with the standard RCT in terms of sample size requirements. Then, based on three scenarios regarding the development of the treatment effect over time, the advantages, limitations and potential costs of the delayed-start design are discussed. We clarify that delayed-start design is not suitable for drugs that establish an immediate treatment effect, but for drugs with effects developing over time, instead. In addition, the sample size will always increase as an implication for a reduced time on placebo resulting in a decreased treatment effect. A number of papers have repeated well-known arguments to justify the delayed-start design as appropriate alternative to the standard parallel group RCT in the field of rare disease and do not discuss the specific needs of research methodology in this field. The main point is that a limited time on placebo will result in an underestimated treatment effect and, in consequence, in larger sample size requirements compared to those expected under a standard parallel-group design. This also impacts on benefit-risk assessment.

  18. Liquid metal blanket module testing and design for ITER/TIBER II

    International Nuclear Information System (INIS)

    Mattas, R.F.; Cha, Y.; Finn, P.A.; Majumdar, S.; Picologlou, B.; Stevens, H.; Turner, L.

    1988-05-01

    A major goal for ITER is the testing of nuclear components to demonstrate the integrated performance of the most attractive concepts that can lead to a commercial fusion reactor. As part of the ITER/TIBER II study, the test program and design of test models were examined for a number of blanket concepts. The work at Argonne National Laboratory focused on self-cooled liquid metal blankets. A test program for liquid metal blankets was developed based upon the ITER/TIBER II operating schedule and the specific data needs to resolve the key issues for liquid metals. Testing can begin early in reactor operation with liquid metal MHD tests to confirm predictive capability. Combined heat transfer/MHD tests can be performed during initial plasma operation. After acceptable heat transfer performance is verified, tests to determine the integrated high temperature performance in a neutron environment can begin. During the high availability phase operation, long term performance and reliability tests will be performed. It is envisioned that a companion test program will be conducted outside ITER to determine behavior under severe accident conditions and upper performance limits. A detailed design of a liquid metal test module and auxiliary equipment was also developed. The module followed the design of the TPSS blanket. Detailed analysis of the heat transfer and tritium systems were performed, and the overall layout of the systems was determined. In general, the blanket module appears to be capable of addressing most of the testing needs. 8 refs., 27 figs., 11 tabs

  19. Design and optimization of the PBFA II vacuum interface and transmission lines for light ion fusion

    International Nuclear Information System (INIS)

    Mc Daniel, D.H.; Stinnett, R.W.; Gray, E.W.; Mattis, R.E.

    1985-01-01

    The PBFA II vacuum insulator was originally designed for optimum coupling to a proton ion diode with minimum inductance. In July 1983 it was decided that lithium ions at 30 MeV would be the baseline for PBFA II. This requires the use of Plasma Opening Switches (POS) and vacuum inductor to reach 30 MV. To achieve this, the vacuum magnetically insulated transmission lines had to be redesigned as an inductive energy store. To gain optimum coupling to this vacuum inductor, the output impedance of the water section was increased by the use of a water-dielectric transformer. The calculations leading to the final design are discussed

  20. Exploration of alternate catalytic mechanisms and optimization strategies for retroaldolase design.

    Science.gov (United States)

    Bjelic, Sinisa; Kipnis, Yakov; Wang, Ling; Pianowski, Zbigniew; Vorobiev, Sergey; Su, Min; Seetharaman, Jayaraman; Xiao, Rong; Kornhaber, Gregory; Hunt, John F; Tong, Liang; Hilvert, Donald; Baker, David

    2014-01-09

    Designed retroaldolases have utilized a nucleophilic lysine to promote carbon-carbon bond cleavage of β-hydroxy-ketones via a covalent Schiff base intermediate. Previous computational designs have incorporated a water molecule to facilitate formation and breakdown of the carbinolamine intermediate to give the Schiff base and to function as a general acid/base. Here we investigate an alternative active-site design in which the catalytic water molecule was replaced by the side chain of a glutamic acid. Five out of seven designs expressed solubly and exhibited catalytic efficiencies similar to previously designed retroaldolases for the conversion of 4-hydroxy-4-(6-methoxy-2-naphthyl)-2-butanone to 6-methoxy-2-naphthaldehyde and acetone. After one round of site-directed saturation mutagenesis, improved variants of the two best designs, RA114 and RA117, exhibited among the highest kcat (>10(-3)s(-1)) and kcat/KM (11-25M(-1)s(-1)) values observed for retroaldolase designs prior to comprehensive directed evolution. In both cases, the >10(5)-fold rate accelerations that were achieved are within 1-3 orders of magnitude of the rate enhancements reported for the best catalysts for related reactions, including catalytic antibodies (kcat/kuncat=10(6) to 10(8)) and an extensively evolved computational design (kcat/kuncat>10(7)). The catalytic sites, revealed by X-ray structures of optimized versions of the two active designs, are in close agreement with the design models except for the catalytic lysine in RA114. We further improved the variants by computational remodeling of the loops and yeast display selection for reactivity of the catalytic lysine with a diketone probe, obtaining an additional order of magnitude enhancement in activity with both approaches. © 2013.

  1. 75 FR 29605 - Clean Alternative Fuel Vehicle and Engine Conversions

    Science.gov (United States)

    2010-05-26

    ... Part II Environmental Protection Agency 40 CFR Parts 85 and 86 Clean Alternative Fuel Vehicle and...-0299; FRL-9149-9] RIN 2060-AP64 Clean Alternative Fuel Vehicle and Engine Conversions AGENCY... streamline the process by which manufacturers of clean alternative fuel conversion systems may demonstrate...

  2. Alternative glues for the production of ATLAS silicon strip modules for the Phase-II upgrade of the ATLAS Inner Detector

    CERN Document Server

    INSPIRE-00407830; Bloch, Ingo; Edwards, Sam; Friedrich, Conrad; Gregor, Ingrid M.; Jones, T; Lacker, Heiko; Pyatt, Simon; Rehnisch, Laura; Sperlich, Dennis; Wilson, John

    2016-05-24

    The Phase-II upgrade of the ATLAS detector for the High Luminosity Large Hadron Collider (HL-LHC) includes the replacement of the current Inner Detector with an all-silicon tracker consisting of pixel and strip detectors. The current Phase-II detector layout requires the construction of 20,000 strip detector modules consisting of sensor, circuit boards and readout chips, which are connected mechanically using adhesives. The adhesive between readout chips and circuit board is a silver epoxy glue as was used in the current ATLAS SemiConductor Tracker (SCT). This glue has several disadvantages, which motivated the search for an alternative. This paper presents a study concerning the use of six ultra-violet (UV) cure glues and a glue pad for use in the assembly of silicon strip detector modules for the ATLAS upgrade. Trials were carried out to determine the ease of use, the thermal conduction and shear strength, thermal cycling, radiation hardness, corrosion resistance and shear strength tests. These investigatio...

  3. Alternate MIMO AF relaying networks with interference alignment: Spectral efficient protocol and linear filter design

    KAUST Repository

    Park, Kihong

    2013-02-01

    In this paper, we study a two-hop relaying network consisting of one source, one destination, and three amplify-and-forward (AF) relays with multiple antennas. To compensate for the capacity prelog factor loss of 1/2$ due to the half-duplex relaying, alternate transmission is performed among three relays, and the inter-relay interference due to the alternate relaying is aligned to make additional degrees of freedom. In addition, suboptimal linear filter designs at the nodes are proposed to maximize the achievable sum rate for different fading scenarios when the destination utilizes a minimum mean-square error filter. © 1967-2012 IEEE.

  4. Reactor building design of nuclear power plant ATUCHA II, Argentina

    International Nuclear Information System (INIS)

    Rufino, R.E.; Hermann, E.R.; Richter, E.

    1984-01-01

    It is presented the civil engineering project carried out by the joint venture Hochtief - Techint-Bignoli (HTB) for the reactor building at the Atucha II power plant (PHWR of 745 MWe) in Buenos Aires. All the other civil projects at Atucha II are also being carried out by HTB. This building has the same general characteristics of the PWR plants developed by KWU in Germany, known for the spherical steel containment 56m in diameter. Nevertheless, it differs from those principally in the equipment lay-out and the remarkable foundation depth. From the basic engineering provided by ENACE, the joint venture has had to face the challenge of designing a tridimensional structure of large size. This has necessitated using simplified models which had to be superimposed, since the use of only one spatial mode would be highly inadequate, lacking the flexibility necessary to absorb the numerous modifications that this type of project undergoes during construction. In addition, this procedure has eliminated resorting to numerous and costly computer processings. (Author) [pt

  5. Increasing spelling achievement: an analysis of treatment procedures utilizing an alternating treatments design.

    OpenAIRE

    Ollendick, T H; Matson, J L; Esveldt-Dawson, K; Shapiro, E S

    1980-01-01

    Two studies which examine the effectiveness of spelling remediation procedures are reported. In both studies, an alternating treatment design was employed. In the first study, positive practice overcorrection plus positive reinforcement was compared to positive practice alone and a no-remediation control condition. In the second study, positive practice plus positive reinforcement was compared to a traditional corrective procedure plus positive reinforcement and a traditional procedure when u...

  6. Methodology for assessing the impacts of alternative rate designs on industrial energy use. Draft report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-01-11

    A task was undertaken to develop a method for analyzing industrial user responses to alternative rate designs. The method described considers the fuel switching and conservation responses of industrial users and the impact to a hypothetical utility regarding revenue stability, annual gas demand, and seasonal fluctuations. Twenty-seven hypothetical industrial plant types have been specified. For each combustor in the plant, the fuel consumption by season, initial fuel type, fuel switching costs, conservation costs, and amount of fuel conservable is provided. The decision making takes place at the plant level and is aggregated to determine the impact to the utility. Section 2 discusses the factors affecting an industrial user's response to alternative rate designs. Section 3 describes the methodology, includes an overview of the model and an example industrial user's response to a set of fuel prices. The data describing the 27 hypothetical firms is in an appendix.

  7. NASA Alternative Orion Small Cell Battery Design Support

    Science.gov (United States)

    Haynes, Chuck

    2016-01-01

    and analysis were completed and reviewed for endorsement by NASA Engineering and Safety Center team members. All Key Test Objectives were met and the small cell design alternative was demonstrated and selected to be a feasible drop in replacement for the MPCV Orion CM Battery for EM2 mission.

  8. Design of sustainable chemical processes: Systematic retrofit analysis, generation and evaluation alternatives

    DEFF Research Database (Denmark)

    Carvalho, Ana; Gani, Rafiqul; Matos, Henrique

    2008-01-01

    eliminating the need to identify trade-off-based solutions. These indicators are also able to reduce (where feasible) a set of safety indicators. An indicator sensitivity analysis algorithm has been added to the methodology to define design targets and to generate sustainable process alternatives. A computer-aided...... tool has been developed to facilitate the calculations needed for the application of the methodology. The application of the indicator-based methodology and the developed software are highlighted through a process flowsheet for the production of vinyl chlorine monomer (VCM)....

  9. Functional design criteria for project W-252, phase II liquid effluent treatment and disposal. Revision 2

    International Nuclear Information System (INIS)

    Hatch, C.E.

    1995-05-01

    This document is the Functional Design Criteria for Project W-252. Project W-252 provides the scope to provide BAT/AKART (best available technology...) to 200 Liquid Effluent Phase II streams (B-Plant). This revision (Rev. 2) incorporates a major descoping of the project. The descoping was done to reflect a combination of budget cutting measures allowed by a less stringent regulatory posture toward the Phase II streams

  10. SPIRIT: A seamless phase I/II randomized design for immunotherapy trials.

    Science.gov (United States)

    Guo, Beibei; Li, Daniel; Yuan, Ying

    2018-06-07

    Immunotherapy-treatments that enlist the immune system to battle tumors-has received widespread attention in cancer research. Due to its unique features and mechanisms for treating cancer, immunotherapy requires novel clinical trial designs. We propose a Bayesian seamless phase I/II randomized design for immunotherapy trials (SPIRIT) to find the optimal biological dose (OBD) defined in terms of the restricted mean survival time. We jointly model progression-free survival and the immune response. Progression-free survival is used as the primary endpoint to determine the OBD, and the immune response is used as an ancillary endpoint to quickly screen out futile doses. Toxicity is monitored throughout the trial. The design consists of two seamlessly connected stages. The first stage identifies a set of safe doses. The second stage adaptively randomizes patients to the safe doses identified and uses their progression-free survival and immune response to find the OBD. The simulation study shows that the SPIRIT has desirable operating characteristics and outperforms the conventional design. Copyright © 2018 John Wiley & Sons, Ltd.

  11. Application of Box-Behnken designs in parameters optimization of differential pulse anodic stripping voltammetry for lead(II) determination in two electrolytes.

    Science.gov (United States)

    Yu, Xiao-Lan; He, Yong

    2017-06-05

    Box-Behnken design was advantageous to parameters optimization of differential pulse anodic stripping voltammetry (DPASV) for the analysis of lead(II) with its high efficiency and accuracy. Five Box-Behnken designs were designed and conducted in the electrolyte of 0.1 mol/L acetate buffer and 0.1 mol/L HCl without the removal of oxygen. Significant parameters and interactions in each electrolyte were found (P-value Box-Behnken designs in parameters optimization of DPASV for lead(II) determination regardless of the electrolyte kinds.

  12. Design and development of cryo-module test system for 1.3 GHz LCLS-II cryomodule

    International Nuclear Information System (INIS)

    Khunt, A.C.S.; Anupam Kumar Sinha, B.; Aravind, T.C.; Mishra, D.V.K.; Sinha, E.A.K.; Mukesh Goyal, F.; Tejas Rane, G.

    2015-01-01

    Cryomodule Test System (CMTS) is a major cryogenic system designed and developed at Centre for Design and Manufacture (CDM), BARC under Indian Institutions and Fermi Lab Collaboration (IIFC). It is necessary test bed to measure the performance of superconducting RF cavities in Cryomodule. CMTS is required to test 1.3 GHz LCLS-II Cryomodule for Stanford Linear Accelerator Centre (SLAC), USA. Feed Cap and End Cap sub systems of Cryomodule Test System (CMTS) is designed and developed at CDM, BARC. Feed cap and End cap are 2K liquid helium distribution system for LCLS-II RF Cavity Bath and insulated by intermediate radiation shields maintained at 5K and 40K and Multilayer Insulation. The whole distribution system is enclosed in horizontal vacuum shells of approximately 1100 mm in diameter and 3000 mm in total length. This development was very challenging as many design considerations and decisions for 2K cryogenic requirements have been made and implemented. Also intricate mounting of ceramic sensors both internally and externally (surface mounted) for very low temperature measurements, low temperature epoxy bonding and multi-layer insulation wrapping were successfully completed. (author)

  13. Design of glycopeptides used to investigate class II MHC binding and T-cell responses associated with autoimmune arthritis.

    Directory of Open Access Journals (Sweden)

    Ida E Andersson

    Full Text Available The glycopeptide fragment CII259-273 from type II collagen (CII binds to the murine A(q and human DR4 class II Major Histocompatibility Complex (MHC II proteins, which are associated with development of murine collagen-induced arthritis (CIA and rheumatoid arthritis (RA, respectively. It has been shown that CII259-273 can be used in therapeutic vaccination of CIA. This glycopeptide also elicits responses from T-cells obtained from RA patients, which indicates that it has an important role in RA as well. We now present a methodology for studies of (glycopeptide-receptor interactions based on a combination of structure-based virtual screening, ligand-based statistical molecular design and biological evaluations. This methodology included the design of a CII259-273 glycopeptide library in which two anchor positions crucial for binding in pockets of A(q and DR4 were varied. Synthesis and biological evaluation of the designed glycopeptides provided novel structure-activity relationship (SAR understanding of binding to A(q and DR4. Glycopeptides that retained high affinities for these MHC II proteins and induced strong responses in panels of T-cell hybridomas were also identified. An analysis of all the responses revealed groups of glycopeptides with different response patterns that are of high interest for vaccination studies in CIA. Moreover, the SAR understanding obtained in this study provides a platform for the design of second-generation glycopeptides with tuned MHC affinities and T-cell responses.

  14. Design of traveling wave windows for the PEP-II RF coupling network

    International Nuclear Information System (INIS)

    Kroll, N.M.; Ng, C.K.; Judkins, J.; Neubauer, M.

    1995-05-01

    The waveguide windows in the PEP-II RF coupling network have to withstand high power of 500 kW. Traveling wave windows have lower power dissipation than conventional self-matched windows, thus rendering the possibility of less stringent mechanical design. The traveling wave behavior is achieved by providing a reflecting iris on each side of the window, and depending on the configuration of the irises, traveling wave windows are characterized as inductive or capacitive types. A numerical design procedure using MAFIA has been developed for traveling wave windows. The relative advantages of inductive and capacitive windows are discussed. Furthermore, the issues of bandwidth and multipactoring are also addressed

  15. Plasma parameters for alternate operating modes of TIBER-II

    International Nuclear Information System (INIS)

    Fenstermacher, M.E.; Devoto, R.S.; Logan, B.G.; Perkins, L.J.

    1987-01-01

    Parameters for operating points of TIBER-II, different from the baseline steady-state operation, are presented. These results have been generated with the MUMAK tokamak power balance code. Pulsed ignited and high performance steady-state operating points are described. 20 refs

  16. Flexible design in water and wastewater engineering--definitions, literature and decision guide.

    Science.gov (United States)

    Spiller, Marc; Vreeburg, Jan H G; Leusbrock, Ingo; Zeeman, Grietje

    2015-02-01

    Urban water and wastewater systems face uncertain developments including technological progress, climate change and urban development. To ensure the sustainability of these systems under dynamic conditions it has been proposed that technologies and infrastructure should be flexible, adaptive and robust. However, in literature it is often unclear what these technologies and infrastructure are. Furthermore, the terms flexible, adaptive and robust are often used interchangeably, despite important differences. In this paper we will i) define the terminology, ii) provide an overview of the status of flexible infrastructure design alternatives for water and wastewater networks and treatment, and iii) develop guidelines for the selection of flexible design alternatives. Results indicate that, with the exception of Net Present Valuation methods, there is little research available on the design and evaluation of technologies that can enable flexibility. Flexible design alternatives reviewed include robust design, phased design, modular design, modular/component platform design and design for remanufacturing. As developments in the water sector are driven by slow variables (climate change, urban development), rather than market forces, it is suggested that phased design or component platform designs are suitable for responding to change, while robust design is an option when operations face highly dynamic variability. Copyright © 2014 Elsevier Ltd. All rights reserved.

  17. Feed-water heaters alternative design comparison; Comparacion de disenos alternativos de calentadores

    Energy Technology Data Exchange (ETDEWEB)

    Torres Toledano, Gerardo [Instituto de Investigaciones Electricas, Cuernavaca (Mexico)

    1988-12-31

    A procedure is presented for the alternative design comparison of feed water heaters, based in the failure records of damaged tubes during operation. The procedure is used for cases in which non-continuous or random inspections are made to the feed-water heaters. [Espanol] Se presenta un procedimiento para comparar disenos alternativos de calentadores, basandose en los registros de fallas de los tubos rotos acumuladas durante su operacion. El procedimiento se emplea para casos en los que se realizan inspecciones a los calentadores no continuas, ya sea periodicas o al azar.

  18. Alternative basis for the theory of complex spectra II

    International Nuclear Information System (INIS)

    Harter, W.G.; Patterson, C.W.

    1975-01-01

    The atomic angular factor calculation methods are simplified and extended to include a treatment of spin-orbit operators and multiple shell configurations (II'...) sup(n). A tableau formula is given for the matrix between slater states and states of definite total spin

  19. The alternative library

    OpenAIRE

    Collinson, Timothy; Williams, A.

    2004-01-01

    Much time and effort has been devoted to designing and developing library Web sites that are easy to navigate by both new students and experienced researchers. In a review of the Southampton Institute Library it was decided that in addition to updating the existing homepage an alternative would be offered. Drawing on theory relating to user interface design, learning styles and creative thinking, an Alternative Library navigation system was added to the more traditional library homepage. The ...

  20. Assessment of alternative vessel and blanket design on ITER operation

    Energy Technology Data Exchange (ETDEWEB)

    Cavinato, M., E-mail: mario.cavinato@f4e.europa.e [FUSION FOR ENERGY Joint Undertaking, 08019 Barcelona (Spain); Portone, A.; Saibene, G.; Sartori, R. [FUSION FOR ENERGY Joint Undertaking, 08019 Barcelona (Spain); Albanese, R.; Ambrosino, G.; Ariola, M. [Associazione Euratom-ENEA-CREATE, DIMET, Universita degli Studi di Napoli (Italy); Artaserse, G. [Associazione Euratom-ENEA-CREATE, DIMET, Universita degli Studi di Reggio Calabria (Italy); Mattei, M. [Associazione Euratom-ENEA-CREATE, DIAM, Seconda Universita di Napoli, Via Roma 29, Aversa, CE 81031 Italy (Italy); Pironti, A. [Associazione Euratom-ENEA-CREATE, DIMET, Universita degli Studi di Napoli (Italy); Villone, F. [Associazione Euratom-ENEA-CREATE, DIMET, Universita degli Studi di Cassino (Italy)

    2010-12-15

    In the framework of the ITER project, an investigation has been conducted on an alternative vessel and blanket design, aimed at reducing cost and production risk. The modifications proposed have a strong impact on plasma control since they affect the main conducting structures surrounding the plasma column, providing passive stabilization but at the same time shielding the field generated by the active coils to control the plasma motion and shape. An extensive analysis was performed to assess the plasma vertical controllability and the modified requirements to the in-vessel vertical stability coils system as well as to the external Poloidal Field coils system. A similar analysis was aimed at assessing the performance of the shape control system in presence of the modified structures. The effect on plasma breakdown was also evaluated in terms of maximum initial loop voltage, quality of magnetic null and the flux loss related to the breakdown delay that was quantified under the same hypothesis employed by ITER for the baseline design. Furthermore, the modified design presents issues for the magnetic diagnostic system, related to the shielding of the probes by the eddy currents, which were analysed with a 3D model. The results of the analyses performed have some general interest in particular regarding the influence on plasma stability of 3D structures with close proximity to the plasma. The present paper aims at giving an overview of the analyses that have been carried out and a summary of the results in terms of impact of the modified design on plasma control and scenario, and in general an evaluation of the role of passive structure in plasma vertical stability and shape control.

  1. Selective sensing of mercury(II) using PVC-based membranes incorporating recently synthesized 1,3-alternate thiacalix[4]crown ionophore.

    Science.gov (United States)

    Mahajan, Rakesh Kumar; Kamal, Ajar; Kumar, Naresh; Bhalla, Vandana; Kumar, Manoj

    2013-05-01

    The construction and electrodes characteristics of poly(vinylchloride) (PVC)-based polymeric membrane electrode (PME) and coated graphite electrode (CGE), incorporating 1,3-alternate thiacalix[4]crown as ionophore for estimation of Hg(II) ions, are reported here. The best potential response was observed for PME-1 having membrane composition of: ionophore (6.2 mg), PVC (100.0 mg), 2-nitrophenyl octyl ether (2-NPOE; 200.0 mg), and sodium tetraphenyl borate (NaTPB; 2.0 mg); for CGE-1 with the membrane composition: ionophore (3.5 mg), PVC (40.0 mg), 2-NPOE (80.0 mg), and NaTPB (2.0 mg). The electrodes exhibits Nernstian slope of 29.16 mV/decade with PME-1 and 30.39 mV/decade with CGE-1 for Hg(II) ions over wide concentration range, i.e., 1.0 × 10(-1) to 5.0 × 10(-6) M with PME-1 and 1.0 × 10(-1) to 5.0 × 10(-7) M with CGE-1. Lower detection limits were found to be 9.77 × 10(-6) M for PME-1 and 7.76 × 10(-7) M for CGE-1 with response time varying from 10 to 20 s. Also, these electrodes work within pH range of 2.0-6.0 for PME-1 and 1.5-6.5 for CGE-1. Overall, CGE-1 has been found to be better than PME-1. CGE-1 has been used as indicator electrode for the potentiometric titration of Hg(II) ions with EDTA as well as successfully applied for determination of Hg(II) content in wastewater, insecticide, dental amalgam, and ayurvedic medicines samples with very good performance (0.9974 correlation coefficient in the comparison against volumetric method).

  2. The high integrity design and manufacture of the Heysham II/Torness gas baffle

    International Nuclear Information System (INIS)

    Armor, J.; Day, B.V.; White, C.M.

    1985-01-01

    The AGR design used on the Heysham II and Torness power stations requires a gas baffle which is essentially a steel pressure vessel for which one can demonstrate a high degree of integrity. The design, analytical, manufacturing, erection and testing processes which were undertaken to achieve the standard required of the completed assembly are discussed. To this end the vessels were manufactured in purpose-made shops and transported to site, leaving a minimum amount of work to be undertaken at site. Subsequent evaluation has shown a very low probability of failure compared with conventional steel pressure vessels. (author)

  3. 75 FR 56015 - Vessel Inspection Alternatives

    Science.gov (United States)

    2010-09-15

    ... DEPARTMENT OF HOMELAND SECURITY Coast Guard 46 CFR Part 8 Vessel Inspection Alternatives CFR... Certificate; (ii) International Tonnage Certificate; (iii) Cargo Ship Safety Construction Certificate; (iv) Cargo Ship Safety Equipment Certificate; and (v) International Oil Pollution Prevention Certificate; and...

  4. The PEP-II Asymmetric B Factory: Design details and R ampersand D results

    International Nuclear Information System (INIS)

    Bloom, E.; DeStaebler, H.; Dorfan, J.

    1994-06-01

    PEP-II, a 9 GeV x 3.1 GeV electron-positron collider with a design luminosity of 3 x 10 33 cm -2 s -1 has now been approved for construction by SLAC, LBL and LLNL for the purpose of studying CP violation in the B bar B system. This upgrade project involves replacing the vacuum and RF systeum of PEP, which will serve as the high-energy ring (HER), along with the addition of a new low-energy ring (LER) mounted atop the HER. Designs for both rings are described, and the anticipated project construction schedule is indicated. Collider operation will begin at the end of 1998. An aggressive R ampersand D program has been carried out to validate our design choices; key results in the areas of lattice design, vacuum, RF, and multibunch feedback are summarized

  5. Influence of Different Patellofemoral Design Variations Based on Genesis II Total Knee Endoprosthesis on Patellofemoral Pressure and Kinematics.

    Science.gov (United States)

    Leichtle, Ulf G; Lange, Barbara; Herzog, Yvonne; Schnauffer, Peter; Leichtle, Carmen I; Wülker, Nikolaus; Lorenz, Andrea

    2017-01-01

    In total knee arthroplasty (TKA), patellofemoral groove design varies greatly and likely has a distinct influence on patellofemoral biomechanics. To analyse the selective influence, five patellofemoral design variations were developed based on Genesis II total knee endoprosthesis (original design, being completely flat, being laterally elevated, being medially elevated, and both sides elevated) and made from polyamide using rapid prototyping. Muscle-loaded knee flexion was simulated on 10 human knee specimens using a custom-made knee simulator, measuring the patellofemoral pressure distribution and tibiofemoral and patellofemoral kinematics. The measurements were carried out in the native knee as well as after TKA with the 5 design prototypes. The overall influence of the different designs on the patellofemoral kinematics was small, but we found detectable effects for mediolateral tilt ( p patellofemoral pressures, major interindividual differences were seen between the designs, which, on average, largely cancelled each other out. These results suggest that the elevation of the lateral margin of the patellofemoral groove is essential for providing mediolateral guidance, but smooth contouring as with original Genesis II design seems to be sufficient. The pronounced interindividual differences identify a need for more patellofemoral design options in TKA.

  6. TIBER II/ETR final design report: Volume 1, 1.0 Introduction; 2.0 plasma engineering

    International Nuclear Information System (INIS)

    Lee, J.D.

    1987-09-01

    This paper discusses the design of the TIBER II tokamak test reactor. Specific topics discussed are the physics objectives for Tiber, magnetics, baseline operating point, pulsed inductive operation, edge physics and impurity control, fueling, disruption control, vertical stability and impurity flow reversal

  7. TIBER II/ETR final design report: Volume 1, 1. 0 Introduction; 2. 0 plasma engineering

    Energy Technology Data Exchange (ETDEWEB)

    Lee, J.D. (ed.)

    1987-09-01

    This paper discusses the design of the TIBER II tokamak test reactor. Specific topics discussed are the physics objectives for Tiber, magnetics, baseline operating point, pulsed inductive operation, edge physics and impurity control, fueling, disruption control, vertical stability and impurity flow reversal. (LSP)

  8. BNL ATF II beamlines design

    Energy Technology Data Exchange (ETDEWEB)

    Fedurin, M. [Brookhaven National Lab. (BNL), Upton, NY (United States); Jing, Y. [Brookhaven National Lab. (BNL), Upton, NY (United States); Stratakis, D. [Brookhaven National Lab. (BNL), Upton, NY (United States); Swinson, C. [Brookhaven National Lab. (BNL), Upton, NY (United States)

    2015-05-03

    The Brookhaven National Laboratory. Accelerator Test Facility (BNL ATF) is currently undergoing a major upgrade (ATF-II). Together with a new location and much improved facilities, the ATF will see an upgrade in its major capabilities: electron beam energy and quality and CO2 laser power. The electron beam energy will be increased in stages, first to 100-150 MeV followed by a further increase to 500 MeV. Combined with the planned increase in CO2 laser power (from 1-100 TW), the ATF-II will be a powerful tool for Advanced Accelerator research. A high-brightness electron beam, produced by a photocathode gun, will be accelerated and optionally delivered to multiple beamlines. Besides the energy range (up to a possible 500 MeV in the final stage) the electron beam can be tailored to each experiment with options such as: small transverse beam size (<10 um), short bunch length (<100 fsec) and, combined short and small bunch options. This report gives a detailed overview of the ATFII capabilities and beamlines configuration.

  9. Design of the shield door and transporter for the Culham Conceptual Tokamak Reactor Mark II

    International Nuclear Information System (INIS)

    Guthrie, J.A.S.

    1980-04-01

    In the Culham Conceptual Tokamak Reactor MK II access to the interior for blanket maintenance is through large openings in the fixed shield structure closed by removable shield doors when the reactor is operational. This report describes the design of the 200 tonne doors and the associated special-purpose remote operating transporter manipulator. The design, which has not been optimised, generally uses available commercial equipment and state-of-the-art techniques. (U.K.)

  10. A Modified Jonckheere Test Statistic for Ordered Alternatives in Repeated Measures Design

    Directory of Open Access Journals (Sweden)

    Hatice Tül Kübra AKDUR

    2016-09-01

    Full Text Available In this article, a new test based on Jonckheere test [1] for  randomized blocks which have dependent observations within block is presented. A weighted sum for each block statistic rather than the unweighted sum proposed by Jonckheereis included. For Jonckheere type statistics, the main assumption is independency of observations within block. In the case of repeated measures design, the assumption of independence is violated. The weighted Jonckheere type statistic for the situation of dependence for different variance-covariance structure and the situation based on ordered alternative hypothesis structure of each block on the design is used. Also, the proposed statistic is compared to the existing test based on Jonckheere in terms of type I error rates by performing Monte Carlo simulation. For the strong correlations, circular bootstrap version of the proposed Jonckheere test provides lower rates of type I error.

  11. Enginnering development of coal-fired high performance power systems phase II and III

    International Nuclear Information System (INIS)

    1998-01-01

    This report presents work carried out under contract DE-AC22-95PC95144 ''Engineering Development of Coal-Fired High Performance Systems Phase II and III.'' The goals of the program are to develop a coal-fired high performance power generation system (HIPPS) that is capable of: thermal efficiency (HHV) >47%; NOx, SOx, and particulates 65% of heat input; all solid wastes benign; cost of electricity <90% of present plants. Phase I, which began in 1992, focused on the analysis of various configurations of indirectly fired cycles and on technical assessments of alternative plant subsystems and components, including performance requirements, developmental status, design options, complexity and reliability, and capital and operating costs. Phase I also included preliminary R ampersand D and the preparation of designs for HIPPS commercial plants approximately 300 MWe in size. This phase, Phase II, involves the development and testing of plant subsystems, refinement and updating of the HIPPS commercial plant design, and the site selection and engineering design of a HIPPS prototype plant. Work reported herein is from: Task 2.2 HITAF Air Heaters; Task 6 HIPPS Commercial Plant Design Update

  12. Assessment of alternative disposal concepts

    Energy Technology Data Exchange (ETDEWEB)

    Autio, J.; Saanio, T.; Tolppanen, P. [Saanio and Riekkola Consulting Engineers, Helsinki (Finland); Raiko, H.; Vieno, T. [VTT Energy, Espoo (Finland); Salo, J.P. [Posiva Oy, Helsinki (Finland)

    1996-12-01

    Four alternative repository designs for the disposal of spent nuclear in the Finnish crystalline bedrock were assessed in the study. The alternatives were: (1) the basic KBS-3 design in which copper canisters are emplaced in vertical deposition holes bored in the floors of horizontal tunnels, (2) the KBS-3-2C design with two canisters in a deposition hole, (3) Short Horizontal Holes (SHH) in the side walls of the tunnels, and (4) the Medium Long Holes (MLH) concept in which approximately 25 canisters are emplaced in a horizontal deposition hole about 200 metres in length bored between central and side tunnels. In all the alternatives considered, the thickness of the layer of compacted bentonite between copper canister and bedrock is 35 cm. Two different copper canister designs were also assessed. Technical feasibility and flexibility, post-closure safety and repository cost were assessed for each of the alternative canister and repository designs. On the basis of this assessment it is recommended that further development and studies should focus on the vacuum- or inert gas-filled cast insert type copper canister and the basic KBS-3 type repository design with a single canister in a vertical deposition hole. The KBS-3 design is robust and flexible and provides excellent post-closure safety. The transfer, emplacement and sealing operations are technically uncomplicated. The alternative options assessed do not offer any significant benefits in safety or cost over the basic design, but they are technically more complex and also in some respects more vulnerable to malfunction during the emplacement of canisters and buffer, as well as common mode failures. (60 refs.).

  13. Assessment of alternative disposal concepts

    International Nuclear Information System (INIS)

    Autio, J.; Saanio, T.; Tolppanen, P.; Raiko, H.; Vieno, T.; Salo, J.P.

    1996-12-01

    Four alternative repository designs for the disposal of spent nuclear in the Finnish crystalline bedrock were assessed in the study. The alternatives were: (1) the basic KBS-3 design in which copper canisters are emplaced in vertical deposition holes bored in the floors of horizontal tunnels, (2) the KBS-3-2C design with two canisters in a deposition hole, (3) Short Horizontal Holes (SHH) in the side walls of the tunnels, and (4) the Medium Long Holes (MLH) concept in which approximately 25 canisters are emplaced in a horizontal deposition hole about 200 metres in length bored between central and side tunnels. In all the alternatives considered, the thickness of the layer of compacted bentonite between copper canister and bedrock is 35 cm. Two different copper canister designs were also assessed. Technical feasibility and flexibility, post-closure safety and repository cost were assessed for each of the alternative canister and repository designs. On the basis of this assessment it is recommended that further development and studies should focus on the vacuum- or inert gas-filled cast insert type copper canister and the basic KBS-3 type repository design with a single canister in a vertical deposition hole. The KBS-3 design is robust and flexible and provides excellent post-closure safety. The transfer, emplacement and sealing operations are technically uncomplicated. The alternative options assessed do not offer any significant benefits in safety or cost over the basic design, but they are technically more complex and also in some respects more vulnerable to malfunction during the emplacement of canisters and buffer, as well as common mode failures. (60 refs.)

  14. Mechanical design of EFW Exo II: A hybrid exoskeleton for elbow-forearm-wrist rehabilitation.

    Science.gov (United States)

    Bian, Hui; Chen, Ziye; Wang, Hao; Zhao, Tieshi

    2017-07-01

    The use of rehabilitation exoskeleton has become an important means for the treatment of stroke patients. A hybrid exoskeleton named EFW Exo II is developed for the motor function rehabilitation of elbow, forearm and wrist. The EFW Exo II is based on a parallel 2-URR/RRS mechanism and a serial R mechanism. It could fit both left and right arms for the symmetrical and open structure, and the distance between the elbow and wrist could automatically adjust for different forearm length. Details of the mechanical design are introduced. Brushless DC servo motors with planetary gear reducer are used as the actuators of the exoskeleton. Gear drive and belt drive are used for power transmission. A three dimensional force sensor is mounted in the handle to regulate the interaction between the exoskeleton and patient. The EFW Exo II can realize rehabilitation exercise for each joint and the ranges of motion meet the rehabilitation demands of daily living.

  15. Treating Youths with Selective Mutism with an Alternating Design of Exposure-Based Practice and Contingency Management

    Science.gov (United States)

    Vecchio, Jennifer; Kearney, Christopher A.

    2009-01-01

    Selective mutism is a severe childhood disorder involving failure to speak in public situations in which speaking is expected. The present study examined 9 youths with selective mutism treated with child-focused, exposure-based practices and parent-focused contingency management via an alternating treatments design. Broadband measures of…

  16. Alternative pavement designs : Randolph park and ride.

    Science.gov (United States)

    2013-05-01

    Previous research on alternative pavement type bidding has proven that various treatments : are unique in terms of constructability, material characteristics, and associated performance. : While some treatments may have higher initial costs, it is im...

  17. HYLIFE-II inertial fusion energy power plant design

    International Nuclear Information System (INIS)

    Moir, R.W.

    1992-01-01

    The HYLIFE-II inertial fusion power plant design study uses a liquid fall, in the form of jets, to protect the first structural wall from neutron damage, x rays, and blast to provide a 30-y lifetime. HYLIFE-I used liquid lithium. HYLIFE-II avoids the fire hazard of lithium by using a molten salt composed of fluorine, lithium, and beryllium (Li 2 BeF 4 ) called Flibe. Access for heavy-ion beams is provided. Calculations for assumed heavy-ion beam performance show a nominal gain of 70 at 5 MJ producing 350 MJ, about 5.2 times less yield than the 1.8 Gj from a driver energy of 4.5 MJ with gain of 400 for HYLIFE-I. The nominal 1 GWe of power can be maintained by increasing the repetition rate by a factor of about 5.2, from 1.5 to 8Hz. A higher repetition rate requires faster re-establishment of the jets after a shot, which can be accomplished in part by decreasing the jet fall height and increasing the jet flow velocity. In addition, although not adequately considered for HYLIFE-I, there is liquid splash that must be forcibly cleared because gravity is too slow, at higher repetition rates than 1 Hz. Splash removal is accomplished in the central region by oscillating jet flows. The cost of electricity is estimated to be 0.09 $/kW·h in constant 1988 dollars, about twice that of future coal and light water reactor nuclear power. The driver beam cost is about one-half the total cost, that is, a zero cost driver would give a calculated cost of electricity of 0.045 $/kWh

  18. HYLIFE-II inertial fusion energy power plant design

    International Nuclear Information System (INIS)

    Moir, R.W.

    1992-01-01

    The HYLIFE-II inertial fusion power plant design study uses a liquid fall, in the form of jets, to protect the first structural wall from neutron damage, x rays, and blast to provide a 30-y lifetime. HYLIFE-I used liquid lithium. HYLIFE-II avoids the fire hazard of lithium by using a molten salt composed of fluorine, lithium, and beryllium (Li 2 BeF 4 ) called Flibe. Access for heavy-ion beams is provided. Calculations for assumed heavy-ion beam performance show a nominal gain of 70 at 5 MJ producing 350 MJ, about 5.2 times less yield than the 1.8 GJ from a driver energy of 4.5 MJ with gain of 400 for HYLIFE-I. The nominal 1 GWe of power can be maintained by increasing the repetition rate by a factor of about 5.2, from 1.5 to 8 Hz. A higher repetition rate requires faster re-establishment of the jets after a shot, which can be accomplished in part by decreasing the jet fall height and increasing the jet flow velocity. In addition, although not adequately considered for HYLIFE-I, there is liquid splash that must be forcibly cleared because gravity is too slow, at higher repetition rates than 1 Hz. Splash removal is accomplished in the central region by oscillating jet flows. The cost of electricity is estimated to be 0.09 $/kW·h in constant 1988 dollars, about twice that of future coal and light water reactor nuclear power. The driver beam cost is about one-half the total cost, that is, a zero cost driver would give a calculated cost of electricity of 0.045 $/kWh

  19. Los Alamos Controlled Air Incinerator for radioactive waste. Volume II. Engineering design reference manual

    Energy Technology Data Exchange (ETDEWEB)

    Koenig, R.A.; Draper, W.E.; Newmyer, J.M.; Warner, C.L.

    1982-10-01

    This two-volume report is a detailed design and operating documentation of the Los Alamos National Laboratory Controlled Air Incinerator (CAI) and is an aid to technology transfer to other Department of Energy contractor sites and the commercial sector. Volume I describes the CAI process, equipment, and performance, and it recommends modifications based on Los Alamos experience. It provides the necessary information for conceptual design and feasibility studies. Volume II provides descriptive engineering information such as drawings, specifications, calculations, and costs. It aids duplication of the process at other facilities.

  20. Los Alamos Controlled Air Incinerator for radioactive waste. Volume II. Engineering design reference manual

    International Nuclear Information System (INIS)

    Koenig, R.A.; Draper, W.E.; Newmyer, J.M.; Warner, C.L.

    1982-10-01

    This two-volume report is a detailed design and operating documentation of the Los Alamos National Laboratory Controlled Air Incinerator (CAI) and is an aid to technology transfer to other Department of Energy contractor sites and the commercial sector. Volume I describes the CAI process, equipment, and performance, and it recommends modifications based on Los Alamos experience. It provides the necessary information for conceptual design and feasibility studies. Volume II provides descriptive engineering information such as drawings, specifications, calculations, and costs. It aids duplication of the process at other facilities

  1. Functional evidence for alternative ANG II-forming pathways in hamster cardiovascular system

    NARCIS (Netherlands)

    Nishimura, H; Buikema, H; Baltatu, O; Ganten, D; Urata, H

    1998-01-01

    Like human chymase, hamster chymase is an ANG II-forming enzyme, but pathophysiological roles of chymase are still unknown. We determined the functional conversion of ANG I and [Pro(11), D-Ala(12)]ANG I, a chymase-selective substrate, to ANG II in the hamster cardiovascular system. ANG I and

  2. Evaluation of Beam Loss and Energy Depositions for a Possible Phase II Design for LHC Collimation

    International Nuclear Information System (INIS)

    Lari, L.; Assmann, R.; Bracco, C.; Brugger, M.; Cerutti, F.; Doyle, E.; Ferrari, A.; Keller, L.; Lundgren, S.; Markiewicz, Thomas W.; Mauri, M.; Redaelli, S.; Sarchiapone, L.; Smith, J.; Vlachoudis, V.; Weiler, T.

    2011-01-01

    The LHC beams are designed to have high stability and to be stored for many hours. The nominal beam intensity lifetime is expected to be of the order of 20h. The Phase II collimation system has to be able to handle particle losses in stable physics conditions at 7 TeV in order to avoid beam aborts and to allow correction of parameters and restoration to nominal conditions. Monte Carlo simulations are needed in order to evaluate the behavior of metallic high-Z collimators during operation scenarios using a realistic distribution of losses, which is a mix of the three limiting halo cases. Moreover, the consequences in the IR7 insertion of the worst (case) abnormal beam loss are evaluated. The case refers to a spontaneous trigger of the horizontal extraction kicker at top energy, when Phase II collimators are used. These studies are an important input for engineering design of the collimation Phase II system and for the evaluation of their effect on adjacent components. The goal is to build collimators that can survive the expected conditions during LHC stable physics runs, in order to avoid quenches of the SC magnets and to protect other LHC equipments.

  3. Alternatives for implementing burnup credit in the design and operation of spent fuel transport casks

    International Nuclear Information System (INIS)

    Sanders, T.L.; Lake, W.H.

    1989-01-01

    It is possible to develop an optimal strategy for implementing burnup credit in spent fuel transport casks. For transport, the relative risk is rapidly reduced if additional pre-transport controls such as a cavity dryness verifications are conducted prior to transport. Some other operational and design features that could be incorporated into a burnup credit cask strategy are listed. These examples represent many of the system features and alternatives already available for use in developing a broadly based criticality safety strategy for implementing burnup credit in the design and operation of spent fuel transport casks. 4 refs., 1 tab

  4. The Political Construction of Alternative Dispute Resolution and Alternatives to Incarceration.

    Science.gov (United States)

    Palumbo, Dennis J.; And Others

    1994-01-01

    This discussion of evaluations of mediation programs at seven sites and of shock incarceration and home arrest focuses on the similarities in the interpretations of alternative dispute-resolution programs to interpretations of alternatives to incarceration programs. The political construction of the two approaches, which are both designed to…

  5. DEVELOPING THE PHYSICS DESIGN FOR NDCX-II, A UNIQUE PULSE-COMPRESSING ION ACCELERATOR

    International Nuclear Information System (INIS)

    Friedman, A.; Barnard, J.J.; Cohen, R.H.; Grote, D.P.; Lund, S.M.; Sharp, W.M.; Faltens, A.; Henestroza, E.; Jung, J.-Y.; Kwan, J.W.; Lee, E.P.; Leitner, M.A.; Logan, B.G.; Vay, J.-L.; Waldron, W.L.; Davidson, R.C.; Dorf, M.; Gilson, E.P.; Kaganovich, I.

    2009-01-01

    The Heavy Ion Fusion Science Virtual National Laboratory (a collaboration of LBNL, LLNL, and PPPL) is using intense ion beams to heat thin foils to the 'warm dense matter' regime at ∼ + ions to ∼1 ns while accelerating it to 3-4 MeV over ∼15 m. Strong space charge forces are incorporated into the machine design at a fundamental level. We are using analysis, an interactive 1D PIC code (ASP) with optimizing capabilities and centroid tracking, and multi-dimensional Warpcode PIC simulations, to develop the NDCX-II accelerator. This paper describes the computational models employed, and the resulting physics design for the accelerator.

  6. Corporate finance in an interest free economy: An alternate approach to practiced Islamic Corporate Finance

    OpenAIRE

    Shaikh, Salman

    2009-01-01

    This paper suggests an alternate approach to corporate finance in an interest free economy by looking beyond practiced Islamic finance and suggesting alternatives for corporate finance in sourcing funds i.e. i) Ijara with embedded options, ii) limited liability partnership, iii) equity modes like Musharakah and Mudarabah iv) income bonds and v) convertible income bonds. It also suggests alternatives for corporate finance in using funds i.e. i) Islamic income funds, ii) Islamic REITs, iii) Tre...

  7. Methodologies for Systematic Assessment of Design Simplification. Annex II

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2013-12-15

    Nuclear power plants are sophisticated engineered systems. To achieve a commercial nuclear power plant, its functions, systems and components need to be elaborated from design ideas to technical solutions and to the appropriate hardware over a long period of time. On the way, several design alternatives usually compete for implementation in the final plant. Engineering teams perform assessments, comparing different proposed engineering options in order to select an appropriate solution for the specific plant aimed at specific customers. This is a common process in design evolution. During such assessments, the trade-offs associated with different options are not always as simple as seen at very early design stages. Any requirement (e.g. relevant to safety, availability or competitiveness) usually has several dimensions; therefore, a change in the design aimed at producing the targeted effect (e.g. simplification of passive safety systems) as a rule produces other effects not directly related to the original idea. It means that the assessment needs to be carried out in iterations, not to bypass any meaningful feedback. The assessment then becomes a challenge for those designers who are interested in exploring innovative approaches and simplified systems. Unlike in several developed countries, so far, nuclear energy has been only marginally used in small and medium sized developing countries. One of the important reasons for this has been the lack of competitive commercial nuclear options with small and medium sized reactors (SMRs). Then, the challenge for SMR designers has been to design simpler plants in order to counterbalance the well known penalties of economy of scale. The lack of experience with SMRs in small and medium sized developing countries could be viewed as practical proof of the lack of commercial success of such reactors. Fossil fuelled gas turbine technologies offer very competitive energy options available from tens to hundreds of MW(e), with

  8. Utilizing subcooled, superfluid He-II in the design of a 12-Tesla tandem mirror experiment

    International Nuclear Information System (INIS)

    Hoard, R.W.; Cornish, D.N.; Baldi, R.W.; Taylor, W.D.

    1981-01-01

    A design study of 12-T yin-yang coils for a conceptual Tandem Mirror Next Step facility has been recently performed by Lawrence Livermore National Laboratory in conjunction with the Convair Division of General Dynamics. The large magnets have major and mirror radii of 3.7 and 1.5 m, 0.70 x 3.75 m 2 cross section, 46.3 MA turns, and an overall current density of 1765 A/cm 2 , obtained by the use of Nb 3 Sn and Nb-Ti superconductors. Each coil is composed of several subcoils separated by internal strengthening substructure to react the enormous electromagnetic forces. The size of the yin-yang coils, and hence the current density, was reduced by utilizing subcooled, superfluid He-II at 1.8 K for the coolant. This paper reviews the design study, with emphasis on He-II heat transport and conductor stability. Methods are also presented which allow the extension of Gorter-Mellink-channel calculations to encompass multiple, interconnecting coolant channels

  9. 76 FR 67287 - Alternative Fuel Transportation Program; Alternative Fueled Vehicle Credit Program (Subpart F...

    Science.gov (United States)

    2011-10-31

    ... additional credits for the use of biodiesel in blends of 20 percent biodiesel or greater and have provided an... discussion in Part II.A), the original program based upon AFV acquisitions and biodiesel use became known as... example, B20 (a 20 percent blend of biodiesel with 80 percent petroleum diesel) is not an alternative fuel...

  10. Scope Oriented Thermoeconomic analysis of energy systems. Part II: Formation Structure of Optimality for robust design

    International Nuclear Information System (INIS)

    Piacentino, Antonio; Cardona, Ennio

    2010-01-01

    This paper represents the Part II of a paper in two parts. In Part I the fundamentals of Scope Oriented Thermoeconomics have been introduced, showing a scarce potential for the cost accounting of existing plants; in this Part II the same concepts are applied to the optimization of a small set of design variables for a vapour compression chiller. The method overcomes the limit of most conventional optimization techniques, which are usually based on hermetic algorithms not enabling the energy analyst to recognize all the margins for improvement. The Scope Oriented Thermoeconomic optimization allows us to disassemble the optimization process, thus recognizing the Formation Structure of Optimality, i.e. the specific influence of any thermodynamic and economic parameter in the path toward the optimal design. Finally, the potential applications of such an in-depth understanding of the inner driving forces of the optimization are discussed in the paper, with a particular focus on the sensitivity analysis to the variation of energy and capital costs and on the actual operation-oriented design.

  11. Embedded SoPC design with NIOS II processor and VHDL examples

    CERN Document Server

    Chu, Pong P

    2011-01-01

    The book is divided into four major parts. Part I covers HDL constructs and synthesis of basic digital circuits. Part II provides an overview of embedded software development with the emphasis on low-level I/O access and drivers. Part III demonstrates the design and development of hardware and software for several complex I/O peripherals, including PS2 keyboard and mouse, a graphic video controller, an audio codec, and an SD (secure digital) card. Part IV provides three case studies of the integration of hardware accelerators, including a custom GCD (greatest common divisor) circuit, a Mandelb

  12. Evaluation on licensability of KNGR system design (II)

    Energy Technology Data Exchange (ETDEWEB)

    Park, G. C.; Seo, K. R. [Seoul National Univ., Seoul (Korea, Republic of); Kim, J. K. [Hanyang Univ., Seoul (Korea, Republic of)] (and others)

    2001-01-15

    The CE methodology of DBA analysis are reviewed. Though UPTF test is different from the KNGR in the geometrical configuration of the down-corner, this was used as a reference to investigate the validity of CEFLASH and COMPERC-II codes in DBA analysis of KNGR. it revealed that CEFLASH is conservative but COMPERC-II for the Refill and Reflood phase is needed for the detailed investigation on ECC bypass, Entrainment, condensation phenomena, CCFL. The direct bypass rate based on the benchmark problem was quantitatively measured. The test model was scaled by the linear scaling methodology, and the accident conditions were the reflood phase at a CB-DEGB LBLOCA. The initial total air flow rate was determined considering the volume scaling factor (1/1000) on criteria of the KNGR design value. The volume rates of ECC water injected: through the DVI nozzles were changed for several case. The direct bypass ratio was about 22 % on the condition of the KNGR scaled-down air volume flow and ECC water velocity at about 1 m/s. The fast neutron fluence at the Reactor Pressure Vessel(RPV) of KNGR designed for 60 years of lifetime was calculated by Monte Carlo simulations and Discrete Ordinates Method for reactor pressure vessel integrity assessment. KNGR core geometry was modeled on a three-dimensional. In the full-scope Monte Carlo method, the maximum fast neutron flux at inner vessel belt line was estimated as 2.738 x 10{sup 10} neutrons/cm{sup 2}{center_dot}see. In the ROCS+MCNP4B calculation, the maximum flux of 2.769 x 10{sup 10} neutrons/ cm{sup 2}{center_dot}see at the RPV was obtained by tallying neutrons crossing the inner surface of the RPV. In ROCS+TORT Calculation, the maximum flux of 3.190 x 10{sup 10} neutrons/cm{sup 2} {center_dot}see was obtained at inner RPV belt line. The lifetime of KNGR was estimated on the basis of conservative end of life fluence limit value of the ABB-CE System 80+. Approximately, 72 Effective Full Power Years (EFPYs), equivalent to 90 calendar

  13. Identifying Effective Design Approaches to Allocate Genotypes in Two-Phase Designs: A Case Study in Pelargonium zonale

    Directory of Open Access Journals (Sweden)

    Heike Molenaar

    2018-01-01

    Full Text Available Robust phenotypic data allow adequate statistical analysis and are crucial for any breeding purpose. Such data is obtained from experiments laid out to best control local variation. Additionally, experiments frequently involve two phases, each contributing environmental sources of variation. For example, in a former experiment we conducted to evaluate production related traits in Pelargonium zonale, there were two consecutive phases, each performed in a different greenhouse. Phase one involved the propagation of the breeding strains to obtain the stem cutting count, and phase two involved the assessment of root formation. The evaluation of the former study raised questions regarding options for improving the experimental layout: (i Is there a disadvantage to using exactly the same design in both phases? (ii Instead of generating a separate layout for each phase, can the design be optimized across both phases, such that the mean variance of a pair-wise treatment difference (MVD can be decreased? To answer these questions, alternative approaches were explored to generate two-phase designs either in phase-wise order (Option 1 or across phases (Option 2. In Option 1 we considered the scenarios (i using in both phases the same experimental design and (ii randomizing each phase separately. In Option 2, we considered the scenarios (iii generating a single design with eight replicates and splitting these among the two phases, (iv separating the block structure across phases by dummy coding, and (v design generation with optimal alignment of block units in the two phases. In both options, we considered the same or different block structures in each phase. The designs were evaluated by the MVD obtained by the intra-block analysis and the joint inter-block–intra-block analysis. The smallest MVD was most frequently obtained for designs generated across phases rather than for each phase separately, in particular when both phases of the design were

  14. Identifying Effective Design Approaches to Allocate Genotypes in Two-Phase Designs: A Case Study in Pelargonium zonale.

    Science.gov (United States)

    Molenaar, Heike; Boehm, Robert; Piepho, Hans-Peter

    2017-01-01

    Robust phenotypic data allow adequate statistical analysis and are crucial for any breeding purpose. Such data is obtained from experiments laid out to best control local variation. Additionally, experiments frequently involve two phases, each contributing environmental sources of variation. For example, in a former experiment we conducted to evaluate production related traits in Pelargonium zonale , there were two consecutive phases, each performed in a different greenhouse. Phase one involved the propagation of the breeding strains to obtain the stem cutting count, and phase two involved the assessment of root formation. The evaluation of the former study raised questions regarding options for improving the experimental layout: (i) Is there a disadvantage to using exactly the same design in both phases? (ii) Instead of generating a separate layout for each phase, can the design be optimized across both phases, such that the mean variance of a pair-wise treatment difference (MVD) can be decreased? To answer these questions, alternative approaches were explored to generate two-phase designs either in phase-wise order (Option 1) or across phases (Option 2). In Option 1 we considered the scenarios (i) using in both phases the same experimental design and (ii) randomizing each phase separately. In Option 2, we considered the scenarios (iii) generating a single design with eight replicates and splitting these among the two phases, (iv) separating the block structure across phases by dummy coding, and (v) design generation with optimal alignment of block units in the two phases. In both options, we considered the same or different block structures in each phase. The designs were evaluated by the MVD obtained by the intra-block analysis and the joint inter-block-intra-block analysis. The smallest MVD was most frequently obtained for designs generated across phases rather than for each phase separately, in particular when both phases of the design were separated with a

  15. Design analysis report: high-integrity container for disposal of EPICOR-II prefilter liners

    International Nuclear Information System (INIS)

    Chapman, R.L.; Reno, H.W.

    1983-06-01

    A high-integrity container has been developed to (a) immobilize the EPIROC-II prefilter liners from Unit-2 of the Three Mile Island (TMI) Nuclear Power Station, and (b) protect possible future, inadvertent intruders from damaging radiation. The container is designed for disposal depths to 90 feet in either wet or dry subsurface conditions. A built-in vent system for each container will permit the release of gas and function as a water barrier at pressures reaching 45 psig. The container has outside dimensions of 62.5 inches diameter by 84 inches high, and is designed to ensure a 300-year functional life. Its design features multiple barriers that prevent corrosives from penetrating container walls. The multiple-barrier approach provides a 1204-year mean time to total failure, based on an assumed single-event-failure probability of 20%. The multiple-corrosion-barrier concept is supplemented by aluminum hydroxide, which reduces the chemical activity of corrosives potentially arising from chemical decomposition of organic resins in the EPICOR-II prefilter liner. Aluminum hydroxide, an effective amphoteric material, tends to neutralize both acids and bases. An epoxy seal between the lid and container body functions as a barrier against any loss of container contents. Two separate epoxy materials fill the space between the lid and container body; they form a seal, mechanically bonding the lid in place. After curing, this epoxy material has a greater strength than the concrete; thus, the concrete has to fail in order for the lid to loosen

  16. Mechanical Design of an Alternate Structure for LARP Nb$_{3}$Sn Quadrupole Magnets for LHC

    CERN Document Server

    Anerella, M; Kovach, P; Schmalzle, J; Wanderer, P; Ambrosio, G; Lamm, M J; Caspi, S; Felice, H; Ferracin, P; Sabbi, G L

    2011-01-01

    An alternative structure for the 120 mm Nb$_{3}$Sn quadrupole magnet is presently under development for use in the upgrade for LHC at CERN. The design aims to build existing technology developed in LARP with the LQ and HQ magnets and to further optimize the features required for operation in the accelerator. The structure includes features for maintaining mechanical alignment of the coils to achieve the required field quality. It also includes a helium containment vessel and provisions for cooling with 1.9 K helium. The development effort includes the assembly of a six inch model to verify required coil load is achieved. Status of the R&D effort and an update on the magnet design, including its incorporation into the design of a complete one meter cold mass is presented.

  17. Technical design report for the upgrade of the ICD for D-Zero Run II

    International Nuclear Information System (INIS)

    Sawyer, L.; De, K.; Draper, P.; Gallas, E.; Li, J.; Sosebee, M.; Stephens, R.W.; White, A.

    1998-01-01

    The Inter Cryostat Detector (ICD) used in Run I of the D0 Experiment will be inoperable in the central, high magnetic field planned for Run II. In Run I, the ICD enhanced the hermeticity and uniformity of the D0 calorimeter system, improving both missing transverse energy and jet energy resolution. The goals for the Run II ICD are the same. In this document, the physics arguments for maintaining the ICD are presented, followed by a detailed description of the planned design changes, prototype tests, construction, installation, and commissioning of the device for the Run II D0 detector. Estimates of costs and schedule can be found on //DOSERVER2/Operations/Upgrade Project/ subareas available via DZERO's WinFrame Program Manager. This detector is not intended to provide any ''L0'' capabilities (for luminosity monitoring), or to provide any EM coverage in the intermediate region, or to provide additional coverage in the intermediate regions, unlike previous upgrades proposed in this detector region. The ICD upgrade described here maintains most of the Run I capabilities in a high magnetic field environment

  18. Ba anti Bar status report on the design of a detector for the study of CP violation at PEP-II at SLAC

    International Nuclear Information System (INIS)

    1993-06-01

    Experiments designed to measure CP-violating asymmetries in the B meson system must emphasize exclusive state reconstruction with the highest possible resolution and efficiency. In the case of B 0 mesons produced in pairs at the Υ(4S) resonance at an asymmetric e + e - storage ring, this capability must be accompanied by precise vertex reconstruction in the direction of the e + e - beams (henceforth the z direction). These are difficult requirements, beyond the scope of any existing storage ring detector. The challenge of designing an asymmetric storage ring capable of producing the large number of neutral B meson pairs required to measure CP-violating asymmetries in decays to CP eigenstates has been handsomely met in the PEP-II design. As the first asymmetric e + e - storage ring, PEP-II presents a novel set of experimental challenges to a 4π detector. This Status Report describes the design of a new detector fully capable of exploiting the physics opportunities provided by PEP-II

  19. Relating DSM-5 section II and section III personality disorder diagnostic classification systems to treatment planning.

    Science.gov (United States)

    Morey, Leslie C; Benson, Kathryn T

    2016-07-01

    Beginning with DSM-III, the inclusion of a "personality" axis was designed to encourage awareness of personality disorders and the treatment-related implications of individual differences, but since that time there is little accumulated evidence that the personality disorder categories provide substantial treatment-related guidance. The DSM-5 Personality and Personality Disorders Work Group sought to develop an Alternative Model for personality disorder, and this study examined whether this model is more closely related to clinicians' decision-making processes than the traditional categorical personality disorder diagnoses. A national sample of 337 clinicians provided complete personality disorder diagnostic information and several treatment-related clinical judgments about one of their patients. The dimensional concepts of the DSM-5 Alternative Model for personality disorders demonstrated stronger relationships than categorical DSM-IV/DSM-5 Section II diagnoses to 10 of 11 clinical judgments regarding differential treatment planning, optimal treatment intensity, and long-term prognosis. The constructs of the DSM-5 Alternative Model for personality disorders may provide more clinically useful information for treatment planning than the official categorical personality disorder diagnostic system retained in DSM-5 Section II. Copyright © 2016 Elsevier Inc. All rights reserved.

  20. Evaluation of Beam Losses And Energy Deposition for a Possible Phase II Design for LHC Collimation

    International Nuclear Information System (INIS)

    Lari, L.; Bracco, C.; Assmann, R.W.; Brugger, M.; Cerutti, F.; Ferrari, A.; Mauri, M.; Redaelli, S.; Sarchiapone, L.; Vlachoudis, V.; Weiler, T.; Doyle, J.E.; Keller, L.; Lundgren, S.A.; Markiewicz, T.W.; Smith, J.C.

    2011-01-01

    The Large Hadron Collider (LHC) beams are designed to have high stability and to be stored for many hours. The nominal beam intensity lifetime is expected to be of the order of 20h. The Phase II collimation system has to be able to handle particle losses in stable physics conditions at 7 TeV in order to avoid beam aborts and to allow correction of parameters and restoration to nominal conditions. Monte Carlo simulations are needed in order to evaluate the behavior of metallic high-Z collimators during operation scenarios using a realistic distribution of losses, which is a mix of the three limiting halo cases. Moreover, the consequences in the IR7 insertion of the worst (case) abnormal beam loss are evaluated. The case refers to a spontaneous trigger of the horizontal extraction kicker at top energy, when Phase II collimators are used. These studies are an important input for engineering design of the collimation Phase II system and for the evaluation of their effect on adjacent components. The goal is to build collimators that can survive the expected conditions during LHC stable physics runs, in order to avoid quenches of the SC magnets and to protect other LHC equipments.

  1. Outsmarting neural networks: an alternative paradigm for machine learning

    Energy Technology Data Exchange (ETDEWEB)

    Protopopescu, V.; Rao, N.S.V.

    1996-10-01

    We address three problems in machine learning, namely: (i) function learning, (ii) regression estimation, and (iii) sensor fusion, in the Probably and Approximately Correct (PAC) framework. We show that, under certain conditions, one can reduce the three problems above to the regression estimation. The latter is usually tackled with artificial neural networks (ANNs) that satisfy the PAC criteria, but have high computational complexity. We propose several computationally efficient PAC alternatives to ANNs to solve the regression estimation. Thereby we also provide efficient PAC solutions to the function learning and sensor fusion problems. The approach is based on cross-fertilizing concepts and methods from statistical estimation, nonlinear algorithms, and the theory of computational complexity, and is designed as part of a new, coherent paradigm for machine learning.

  2. Randomized controlled trials and neuro-oncology: should alternative designs be considered?

    Science.gov (United States)

    Mansouri, Alireza; Shin, Samuel; Cooper, Benjamin; Srivastava, Archita; Bhandari, Mohit; Kondziolka, Douglas

    2015-09-01

    quality of design/reporting of RCTs in neuro-oncology persist. Quality improvement is necessary. Consideration of alternative strategies should be considered.

  3. Grid-connected integrated community energy system. Phase II, Stage 1, final report. Conceptual design, demand and fuel projections and cost analysis

    Energy Technology Data Exchange (ETDEWEB)

    1978-03-08

    The Phase I Report, Grid ICES, presented the broad alternatives and implications for development of an energy system satisfying thermal demand with the co-generation of electric power, all predicated on the use of solid fuels. Participants of the system are the University of Minnesota, operator and primary thermal user, and Northern States Power Company, primary electrical user; with St. Mary's Hospital, Fairview Hospital, and Augsburg College as Add-on Customers for the thermal service (Option I). Included for consideration are the Options of (II) solid waste disposal by the Pyrolysis Method, with heat recovery, and (III) conversion of a portion of the thermal system from steam to hot water distribution to increase co-generation capability and as a demonstration system for future expansion. This report presents the conceptual design of the energy system and each Option, with the economic implications identified so that selection of the final system can be made. Draft outline of the Environmental Assessment for the project is submitted as a separate report.

  4. A design concept of target-moderator-reflector assemblies for KENS-II

    International Nuclear Information System (INIS)

    Watanabe, N.

    1991-01-01

    A design concept of KENS-II target-moderator-reflector assemblies is described. One of the assemblies is dedicated to the cold neutron source, and the other, to the thermal and epithermal neutron source. A flux-trap type moderator-configuration was adopted with a vertical proton-beam injection scheme. All moderators for the cold neutron source are coupled liquid hydrogen moderators with premoderators. A new scheme of proton beam delivery is proposed. The new system can provide several times higher total performance than a reference system based on a traditional single assembly with all decoupled moderators in a wing geometry and with a horizontal proton-beam injection scheme. (author)

  5. High-power RF window design for the PEP-II B Factory

    International Nuclear Information System (INIS)

    Neubauer, M.; Hodgson, J.; Ng, C.; Schwarz, H.; Skarpaas, K.; Kroll, N.; Rimmer, R.

    1994-06-01

    We describe the design of RF windows to transmit up to 500 kW CW to the PEP-II 476 MHz cavities. RF analysis of the windows using high-frequency simulation codes are described. These provide information about the power loss distribution in the ceramic and tim matching properties of the structure. Finite-element analyses of the resulting temperature distribution and thermal stresses are presented. Fabrication methods including a proposed scheme to compensate for thermal expansion s are discussed and hardware tests to validate this approach are described. The effects of surface coatings (intentional and otherwise) and the application of air cooling are considered

  6. Design and first measurements of an alternative calorimetry chamber for the HZB quadrupole resonator

    CERN Document Server

    Keckert, Sebastian; Knobloch, Jens; Kugeler, Oliver

    2015-01-01

    The systematic research on superconducting thin films requires dedicated testing equipment. The Quadrupole Resonator (QPR) is a specialized tool to characterize the superconducting RF properties of circular planar samples. A calorimetric measurement of the RF surface losses allows the surface resistance to be measured with sub nano-ohm resolution. This measurement can be performed over a wide temperature and magnetic field range, at frequencies of 433, 866 and 1300 MHz. The system at Helmholtz-Zentrum Berlin (HZB) is based on a resonator built at CERN and has been optimized to lower peak electric fields and an improved resolution. In this paper the design of an alternative calorimetry chamber is presented, providing flat samples for coating which are easy changeable. All parts are connected by screwing connections and no electron beam welding is required. Furthermore this design enables exchangeability of samples between the resonators at HZB and CERN. First measurements with the new design show ambiguous r...

  7. Energy Conservation Alternatives Study (ECAS): Conceptual Design and Implementation Assessment of a Utility Steam Plant with Conventional Furnace and Wet Lime Stack Gas Scrubbers

    Science.gov (United States)

    Brown, Dale H.

    1976-01-01

    A study was performed to estimate the technical/economic characteristics of a steam power plant (3500 pounds per square inch gauge, 1000 degrees Fahrenheit / 1000 degrees Fahrenheit) with a coal-burning radiant furnace and a wet lime stack gas scrubber to control sulfur emissions. Particulate emissions were controlled by an electrostatic precipitator operating at 300 degrees Fahrenheit. The stack gas from the scrubber was reheated from 125 degrees Fahrenheit to 250 degrees Fahrenheit as a base case, and from 125 degrees Fahrenheit to 175 degrees Fahrenheit as an alternate case. The study was performed on a basis consistent with the General Electric ECAS Phase II evaluation of advanced energy conversion systems for electric utility baseload applications using coal or coal-derived fuels. A conceptual design of the power plant was developed, including the on-site calcination of limestone to lime and the provision of sludge ponds to store the products of flue gas scrubbing. From this design, estimates were derived for power plant efficiency, capital cost, environmental intrusion characteristics, natural resource requirements, and cost of electricity at an assumed capacity factor of 65 percent. An implementation assessment was performed where factors affecting applicability of the conceptual design power plant in electric utility generation systems were appraised. At 250 degrees Fahrenheit and 175 degrees Fahrenheit stack gas temperatures respectively, the plants showed a cost of electricity of 39.8 and 37.0 mills per kilowatt-hours and overall plant efficiencies of 32 percent and 34 percent.

  8. Preliminary Conceptual Design Report for the FACET-II Project at SLAC National Accelerator Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Hogan, Mark [SLAC National Accelerator Lab., Menlo Park, CA (United States)

    2016-04-22

    Plasma wakefield acceleration has the potential to dramatically shrink the size and cost of particle accelerators. Research at the SLAC National Accelerator Laboratory has demonstrated that plasmas can provide 1,000 times the acceleration in a given distance compared with current technologies. Developing revolutionary and more efficient acceleration techniques that allow for an affordable high-energy collider is the focus of FACET, a National User Facility at SLAC. The existing FACET National User Facility uses part of SLAC’s two-mile-long linear accelerator to generate high-density beams of electrons and positrons. FACET-II is a new test facility to develop advanced acceleration and coherent radiation techniques with high-energy electron and positron beams. It is the only facility in the world with high energy positron beams. FACET-II provides a major upgrade over current FACET capabilities and the breadth of the potential research program makes it truly unique. It will synergistically pursue accelerator science that is vital to the future of both advanced acceleration techniques for High Energy Physics, ultra-high brightness beams for Basic Energy Science, and novel radiation sources for a wide variety of applications. The design parameters for FACET-II are set by the requirements of the plasma wakefield experimental program. To drive the plasma wakefield requires a high peak current, in excess of 10kA. To reach this peak current, the electron and positron design bunch size is 10μ by 10μ transversely with a bunch length of 10μ. This is more than 200 times better than what has been achieved at the existing FACET. The beam energy is 10 GeV, set by the Linac length available and the repetition rate is up to 30 Hz. The FACET-II project is scheduled to be constructed in three major stages. Components of the project discussed in detail include the following: electron injector, bunch compressors and linac, the positron system, the Sector 20 sailboat and W chicanes

  9. Multi-Function Waste Tank Facility thermal hydraulic analysis for Title II design

    International Nuclear Information System (INIS)

    Cramer, E.R.

    1994-01-01

    The purpose of this work was to provide the thermal hydraulic analysis for the Multi-Function Waste Tank Facility (MWTF) Title II design. Temperature distributions throughout the tank structure were calculated for subsequent use in the structural analysis and in the safety evaluation. Calculated temperatures of critical areas were compared to design allowables. Expected operating parameters were calculated for use in the ventilation system design and in the environmental impact documentation. The design requirements were obtained from the MWTF Functional Design Criteria (FDC). The most restrictive temperature limit given in the FDC is the 200 limit for the haunch and dome steel and concrete. The temperature limit for the rest of the primary and secondary tanks and concrete base mat and supporting pad is 250 F. Also, the waste should not be allowed to boil. The tank geometry was taken from ICF Kaiser Engineers Hanford drawing ES-W236A-Z1, Revision 1, included here in Appendix B. Heat removal rates by evaporation from the waste surface were obtained from experimental data. It is concluded that the MWTF tank cooling system will meet the design temperature limits for the design heat load of 700,000 Btu/h, even if cooling flow is lost to the annulus region, and temperatures change very slowly during transients due to the high heat capacity of the tank structure and the waste. Accordingly, transients will not be a significant operational problem from the viewpoint of meeting the specified temperature limits

  10. Fort Hood Solar Total Energy Project. Volume II. Preliminary design. Part 1. System criteria and design description. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1979-01-01

    This volume documents the preliminary design developed for the Solar Total Energy System to be installed at Fort Hood, Texas. Current system, subsystem, and component designs are described and additional studies which support selection among significant design alternatives are presented. Overall system requirements which form the system design basis are presented. These include program objectives; performance and output load requirements; industrial, statutory, and regulatory standards; and site interface requirements. Material in this section will continue to be issued separately in the Systems Requirements Document and maintained current through revision throughout future phases of the project. Overall system design and detailed subsystem design descriptions are provided. Consideration of operation and maintenance is reflected in discussion of each subsystem design as well as in an integrated overall discussion. Included are the solar collector subsystem; the thermal storage subsystem, the power conversion sybsystem (including electrical generation and distribution); the heating/cooling and domestic hot water subsystems; overall instrumentation and control; and the STES building and physical plant. The design of several subsystems has progressed beyond the preliminary stage; descriptions for such subsystems are therefore provided in more detail than others to provide complete documentation of the work performed. In some cases, preliminary design parameters require specific verificaton in the definitive design phase and are identified in the text. Subsystem descriptions will continue to be issued and revised separately to maintain accuracy during future phases of the project. (WHK)

  11. Advanced Design of the First Quasi-optical Transmission Line for ECRH at TJ-II

    International Nuclear Information System (INIS)

    Fernandez, A.; Likin, K.; Martin, R.

    1999-01-01

    TJ-II plasma start-up and heating are made by electron cyclotron resonance waves at the second harmonic of the electron cyclotron frequency. The microwave power of the gyrotrons is transmitted by two quasi-optical transmission lines. The first line launches the microwave power under fixed injection geometry, i. e. there is no a possibility to change the launching angle the wave polarization. Due to the long distance between the last focusing mirror and the center TJ-II vessel the beam is quite wide at plasma border. The second line has a moveable mirror installed inside the TJ-II vessel. To get high absorption efficiency and a narrow energy deposition profile the internal mirror focuses the wave beam at plasma center. The beam width is about 2 cm. To get more flexibility in experiments on heating and current drive the first transmission line needs to be upgraded. The designs is presented in this report. It includes and internal mirror to focus the beam and to change the injection angle. A polarizer consisting in two corrugated mirrors will be incorporated to get any wave polarization. Two mirrors with an array of coupling holes and calorimetric measurements of the energy absorbed in the barrier window will permit the estimation of the microwave power launched the TJ-II. (Author) 13 refs

  12. An alternative bactericidal mechanism of action for lantibiotic peptides that target lipid II

    NARCIS (Netherlands)

    Hasper, Hester E.; Kramer, Naomi E.; Smith, James L.; Hillman, J. D.; Zachariah, Cherian; Kuipers, Oscar P.; de Kruijff, Ben; Breukink, Eefjan

    2006-01-01

    Lantibiotics are polycyclic peptides containing unusual amino acids, which have binding specificity for bacterial cells, targeting the bacterial cell wall component lipid II to form pores and thereby lyse the cells. Yet several members of these lipid II - targeted lantibiotics are too short to be

  13. Design of a minimally constraining, passively supported gait training exoskeleton: ALEX II.

    Science.gov (United States)

    Winfree, Kyle N; Stegall, Paul; Agrawal, Sunil K

    2011-01-01

    This paper discusses the design of a new, minimally constraining, passively supported gait training exoskeleton known as ALEX II. This device builds on the success and extends the features of the ALEX I device developed at the University of Delaware. Both ALEX (Active Leg EXoskeleton) devices have been designed to supply a controllable torque to a subject's hip and knee joint. The current control strategy makes use of an assist-as-needed algorithm. Following a brief review of previous work motivating this redesign, we discuss the key mechanical features of the new ALEX device. A short investigation was conducted to evaluate the effectiveness of the control strategy and impact of the exoskeleton on the gait of six healthy subjects. This paper concludes with a comparison between the subjects' gait both in and out of the exoskeleton. © 2011 IEEE

  14. NSLS-II High Level Application Infrastructure And Client API Design

    International Nuclear Information System (INIS)

    Shen, G.; Yang, L.; Shroff, K.

    2011-01-01

    The beam commissioning software framework of NSLS-II project adopts a client/server based architecture to replace the more traditional monolithic high level application approach. It is an open structure platform, and we try to provide a narrow API set for client application. With this narrow API, existing applications developed in different language under different architecture could be ported to our platform with small modification. This paper describes system infrastructure design, client API and system integration, and latest progress. As a new 3rd generation synchrotron light source with ultra low emittance, there are new requirements and challenges to control and manipulate the beam. A use case study and a theoretical analysis have been performed to clarify requirements and challenges to the high level applications (HLA) software environment. To satisfy those requirements and challenges, adequate system architecture of the software framework is critical for beam commissioning, study and operation. The existing traditional approaches are self-consistent, and monolithic. Some of them have adopted a concept of middle layer to separate low level hardware processing from numerical algorithm computing, physics modelling, data manipulating, plotting, and error handling. However, none of the existing approaches can satisfy the requirement. A new design has been proposed by introducing service oriented architecture technology. The HLA is combination of tools for accelerator physicists and operators, which is same as traditional approach. In NSLS-II, they include monitoring applications and control routines. Scripting environment is very important for the later part of HLA and both parts are designed based on a common set of APIs. Physicists and operators are users of these APIs, while control system engineers and a few accelerator physicists are the developers of these APIs. With our Client/Server mode based approach, we leave how to retrieve information to the

  15. Alternatives for Jet Engine Control. Volume 1: Modelling and Control Design with Jet Engine Data

    Science.gov (United States)

    Sain, M. K.

    1985-01-01

    This document compiles a comprehensive list of publications supported by, or related to, National Aeronautics and Space Administration Grant NSG-3048, entitled "Alternatives for Jet Engine Control". Dr. Kurt Seldner was the original Technical Officer for the grant, at Lewis Research Center. Dr. Bruce Lehtinen was the final Technical Officer. At the University of Notre Dame, Drs. Michael K. Sain and R. Jeffrey Leake were the original Project Directors, with Dr. Sain becoming the final Project Director. Publications cover work over a ten-year period. The Final Report is divided into two parts. Volume i, "Modelling and Control Design with Jet Engine Data", follows in this report. Volume 2, "Modelling and Control Design with Tensors", has been bound separately.

  16. Wastewater Management Alternatives for the Cleveland - Akron, Three Rivers Watershed Area. Technical Appendix - Phase II. System Design and Estimate of Cost.

    Science.gov (United States)

    1973-02-01

    8217"•’ 1 1 . i 3 * 1 i 1 1 » K ) 20 J< > 4C 1 * 0 00 100 DRY TONS/DAY Figur« No. 22 A75...HH i " i - j ! . |.. •.\\::\\::\\: ’• ¥•• . t Ü • 1 • — • ii !:- . i . ... j .....,, , HrM j+ji •h • 4i. C O N S T R * r

  17. Tracking costs of alternatively fueled buses in Florida - phase II.

    Science.gov (United States)

    2013-04-01

    The goal of this project is to continue collecting and reporting the data on the performance and costs of alternatively fueled public transit vehicles in the state in a consistent manner in order to keep the Bus Fuels Fleet Evaluation Tool (BuFFeT) c...

  18. Increasing the neutron flux study for the TRR-II core design

    International Nuclear Information System (INIS)

    Chen, C.-H.; Yang, J.-T.; Chou, Y.-C.

    1999-01-01

    The maximum unperturbed thermal flux of the originally proposed core design, which is a 6x6 square arrangement with power level of 20 MW and has been presented at the 6th Meeting of IGORR, for the TRR-II reactor is about 2.0x10 14 n/cm 2 -sec. However, it is no longer satisfied the user's requirement, that is, it must reach at least 2.5x10 14 n/cm 2 -sec. In order to enhance the thermal neutron flux, one of the most effective ways is to increase the average power density. Therefore, two new designs with more compact cores are then proposed and studied. One is 5x6 rectangular arrangement with power of 20 MW; the other one is 5x5 square arrangement with power of 16 MW. It is for sure that both core designs can satisfy thermal hydraulic safety limits. The designed parameters related to neutronics are listed and compared fundamentally. According to our calculation, although both cores have similar average power density, the results show that the 5x6/20 MW design has the maximum unperturbed thermal flux in the D 2 O region about 2.7x10 14 n/cm 2 -sec, and the 5x5/16 MW design has 2.5x10 14 n/cm 2 -sec. The maximum thermal flux in the neighborhood of the longer side of the 5x6 core is about 7% higher than the one in the neighborhood of any side of the 5x5 core. This 'long-side effect' gives the 5x6/20 MW core design an advantage of the utilization of the thermal neutron flux in the D 2 O region. In addition, the 5x5 core is also more sensitive to the reactivity change on account of in-core irradiation test facilities. Therefore, under overall considerations the 5x6/20 MW core design is chosen for further detailed design. (author)

  19. Cobalt(III), nickel(II) and ruthenium(II) complexes of 1,10 ...

    Indian Academy of Sciences (India)

    Co(II) and Ru(II) complexes investigated in this study effect photocleavage of the supercoiled ... DNA is related to their utility in the design and development of synthetic restriction ..... ∗Quasi-reversible/irreversible (electrochemical behaviour of ...

  20. Design of Peptide Immunotherapies for MHC Class-II-Associated Autoimmune Disorders

    Directory of Open Access Journals (Sweden)

    Masha Fridkis-Hareli

    2013-01-01

    Full Text Available Autoimmune disorders, that occur when autoreactive immune cells are induced to activate their responses against self-tissues, affect one percent of the world population and represent one of the top 10 leading causes of death. The major histocompatibility complex (MHC is a principal susceptibility locus for many human autoimmune diseases, in which self-tissue antigens providing targets for pathogenic lymphocytes are bound to HLA molecules encoded by disease-associated alleles. In spite of the attempts to design strategies for inhibition of antigen presentation targeting the MHC-peptide/TCR complex via generation of blocking antibodies, altered peptide ligands (APL, or inhibitors of costimulatory molecules, potent therapies with minimal side effects have yet to be developed. Copaxone (glatiramer acetate, GA is a random synthetic amino acid copolymer that reduces the relapse rate by about 30% in relapsing-remitting multiple sclerosis (MS patients. Based on the elucidated binding motifs of Copaxone and of the anchor residues of the immunogenic myelin basic protein (MBP peptide to HLA-DR molecules, novel copolymers have been designed and proved to be more effective in suppressing MS-like disease in mice. In this report, we describe the rationale for design of second-generation synthetic random copolymers as candidate drugs for a number of MHC class-II-associated autoimmune disorders.

  1. The Ross II procedure: pulmonary autograft in the mitral position.

    Science.gov (United States)

    Athanasiou, Thanos; Cherian, Ashok; Ross, Donald

    2004-10-01

    The surgical management of mitral valve disease in women of childbearing age, young patients, and children with congenital mitral valve defects is made difficult by the prospect of lifelong anticoagulation. We suggest the use of a pulmonary autograft in the mitral position (Ross II procedure) as an alternative surgical technique. We present a review of the literature, historical perspectives, indications, selection criteria, and surgical technique for the Ross II procedure. Our literature search identified 14 studies that reported results from the Ross II operation. Performed in 103 patients, the overall in-hospital mortality was 7 (6.7%), with a late mortality of 10 (9%). Although further research is needed, current evidence suggests the Ross II operation is a valuable alternative in low-risk young patients where valve durability and the complication rate from other procedures is unsatisfactory and anticoagulation not ideal.

  2. Preliminary Assessment of Two Alternative Core Design Concepts for the Special Purpose Reactor

    Energy Technology Data Exchange (ETDEWEB)

    Sterbentz, James W. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Werner, James E. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Hummel, Andrew J. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Kennedy, John C. [Idaho National Lab. (INL), Idaho Falls, ID (United States); O' Brien, Robert C. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Dion, Axel M. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Wright, Richard N. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Ananth, Krishnan P. [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2017-11-01

    The Special Purpose Reactor (SPR) is a small 5 MWt, heat pipe-cooled, fast reactor based on the Los Alamos National Laboratory (LANL) Mega-Power concept. The LANL concept features a stainless steel monolithic core structure with drilled channels for UO2 pellet stacks and evaporator sections of the heat pipes. Two alternative active core designs are presented here that replace the monolithic core structure with simpler and easier to manufacture fuel elements. The two new core designs are simply referred to as Design A and Design B. In addition to ease of manufacturability, the fuel elements for both Design A and Design B can be individually fabricated, assembled, inspected, tested, and qualified prior to their installation into the reactor core leading to greater reactor system reliability and safety. Design A fuel elements will require the development of a new hexagonally-shaped UO2 fuel pellet. The Design A configuration will consist of an array of hexagonally-shaped fuel elements with each fuel element having a central heat pipe. This hexagonal fuel element configuration results in four radial gaps or thermal resistances per element. Neither the fuel element development, nor the radial gap issue are deemed to be serious and should not impact an aggressive reactor deployment schedule. Design B uses embedded arrays of heat pipes and fuel pins in a double-wall tank filled with liquid metal sodium. Sodium is used to thermally bond the heat pipes to the fuel pins, but its usage may create reactor transportation and regulatory challenges. An independent panel of U.S. manufacturing experts has preliminarily assessed the three SPR core designs and views Design A as simplest to manufacture. Herein are the results of a preliminary neutronic, thermal, mechanical, material, and manufacturing assessment of both Design A and Design B along with comparisons to the LANL concept (monolithic core structure). Despite the active core differences, all three reactor concepts behave

  3. Solid Waste Operations Complex W-113, Detail Design Report (Title II). Volume 3: Specifications

    International Nuclear Information System (INIS)

    1995-09-01

    The Solid Waste Retrieval Facility--Phase 1 (Project W113) will provide the infrastructure and the facility required to retrieve from Trench 04, Burial ground 4C, contact handled (CH) drums and boxes at a rate that supports all retrieved TRU waste batching, treatment, storage, and disposal plans. This includes (1) operations related equipment and facilities, viz., a weather enclosure for the trench, retrieval equipment, weighing, venting, obtaining gas samples, overpacking, NDE, NDA, shipment of waste and (2) operations support related facilities, viz., a general office building, a retrieval staff change facility, and infrastructure upgrades such as supply and routing of water, sewer, electrical power, fire protection, roads, and telecommunication. Title I design for the operations related equipment and facilities was performed by Raytheon/BNFL, and that for the operations support related facilities including infrastructure upgrade was performed by KEH. These two scopes were combined into an integrated W113 Title II scope that was performed by Raytheon/BNFL. Volume 3 is a compilation of the construction specifications that will constitute the Title II materials and performance specifications. This volume contains CSI specifications for non-equipment related construction material type items, performance type items, and facility mechanical equipment items. Data sheets are provided, as necessary, which specify the equipment overall design parameters

  4. Solid Waste Operations Complex W-113, Detail Design Report (Title II). Volume 3: Specifications

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    The Solid Waste Retrieval Facility--Phase 1 (Project W113) will provide the infrastructure and the facility required to retrieve from Trench 04, Burial ground 4C, contact handled (CH) drums and boxes at a rate that supports all retrieved TRU waste batching, treatment, storage, and disposal plans. This includes (1) operations related equipment and facilities, viz., a weather enclosure for the trench, retrieval equipment, weighing, venting, obtaining gas samples, overpacking, NDE, NDA, shipment of waste and (2) operations support related facilities, viz., a general office building, a retrieval staff change facility, and infrastructure upgrades such as supply and routing of water, sewer, electrical power, fire protection, roads, and telecommunication. Title I design for the operations related equipment and facilities was performed by Raytheon/BNFL, and that for the operations support related facilities including infrastructure upgrade was performed by KEH. These two scopes were combined into an integrated W113 Title II scope that was performed by Raytheon/BNFL. Volume 3 is a compilation of the construction specifications that will constitute the Title II materials and performance specifications. This volume contains CSI specifications for non-equipment related construction material type items, performance type items, and facility mechanical equipment items. Data sheets are provided, as necessary, which specify the equipment overall design parameters.

  5. Parametric Optimization of Some Critical Operating System Functions--An Alternative Approach to the Study of Operating Systems Design

    Science.gov (United States)

    Sobh, Tarek M.; Tibrewal, Abhilasha

    2006-01-01

    Operating systems theory primarily concentrates on the optimal use of computing resources. This paper presents an alternative approach to teaching and studying operating systems design and concepts by way of parametrically optimizing critical operating system functions. Detailed examples of two critical operating systems functions using the…

  6. Committee Report of the BEPC-II Project Design Review May 13-15, 2002, SLAC

    Energy Technology Data Exchange (ETDEWEB)

    Kawakami, Traci M.

    2002-08-26

    As part of the US-China Cooperative Program in High Energy Physics for the year 2002, a BEPC-II Upgrade Review meeting was held at SLAC, May 13-15, 2002. The upgrade is aimed at improving the luminosity and performance of the BEPC facility at IHEP in Beijing, China with major upgrades to the injector linac, storage ring, and detector. This review addresses mainly the accelerator related issues. Prior to the review, an updated Draft Design Report was made available to the review team. Most important technical change since April 2001 has been a change from a single-ring configuration to a doublering. The goal of the review is to determine whether BEPC-II, if built as described, will meet the operations and physics goals. The charge to the review team is attached as Appendix A.

  7. Towards for Analyzing Alternatives of Interaction Design Based on Verbal Decision Analysis of User Experience

    Directory of Open Access Journals (Sweden)

    Marília Soares Mendes

    2010-04-01

    Full Text Available In domains (as digital TV, smart home, and tangible interfaces that represent a new paradigm of interactivity, the decision of the most appropriate interaction design solution is a challenge. HCI researchers have promoted in their works the validation of design alternative solutions with users before producing the final solution. User experience with technology is a subject that has also gained ground in these works in order to analyze the appropriate solution(s. Following this concept, a study was accomplished under the objective of finding a better interaction solution for an application of mobile TV. Three executable applications of mobile TV prototypes were built. A Verbal Decision Analysis model was applied on the investigations for the favorite characteristics in each prototype based on the user’s experience and their intentions of use. This model led a performance of a qualitative analysis which objectified the design of a new prototype.

  8. Designing the KNK II-TOAST irradiation experiment with the saturn-FS code

    International Nuclear Information System (INIS)

    Ritzhaupt-Kleissl, H.J.; Elbel, H.; Heck, M.

    1991-01-01

    In order to study the existing specification of FBR fuel with respect to allowable fabrication tolerances with the objective to reduce the expense of fabrication and quality control, the TOAST irradiation experiment will be carried out in the 3 rd core of the KNK II. This experiment shall investigate the influence of the following fuel specification parameters on the operational behaviour: - Fuel diameter - Stoichiometry - Sintering atmosphere - Fill gas in the fuel pin. The combination of these test parameters led to a fabrication of 6 types of fuel pellets, giving together with two fill gas mixtures a total of 9 fuel pin types. Design calculations in the frame of the standard licensing procedure have been performed with the SATURN-FS fuel pin behaviour code. These calculations have been done for the steady-state behaviour as well as for some defined design transients, such as startup procedures and overpower ramps

  9. PARIS II: Computer Aided Solvent Design for Pollution Prevention

    Science.gov (United States)

    This product is a summary of U.S. EPA researchers' work developing the solvent substitution software tool PARIS II (Program for Assisting the Replacement of Industrial Solvents, version 2.0). PARIS II finds less toxic solvents or solvent mixtures to replace more toxic solvents co...

  10. Heterometallic Pd(II)-Ni(II) complexes with meso-substituted dibenzotetraaza[14]annulene: double C-H bond activation and formation of a rectangular tetradibenzotetraaza[14]annulene.

    Science.gov (United States)

    Khaledi, Hamid; Olmstead, Marilyn M; Fukuda, Takamitsu; Ali, Hapipah Mohd

    2014-11-03

    Three isomeric 2[Pd(II)-Ni(II)] metal complexes, derived from indoleninyl meso-substituted dibenzotetraaza[14]annulene, were synthesized. The resulting dimers feature Ni···Ni or, alternatively, Ni···π interactions in staggered or slipped cofacial structures. A remarkable insertion of palladium into two different C-H bonds yielded a 4[Pd(II)-Ni(II)] rectangular complex with dimensions of 8.73 × 10.38 Å.

  11. Repository Surface Design Engineering Files Report Rev 00 ICN 1

    International Nuclear Information System (INIS)

    2001-01-01

    The objective of the Repository Surface Design Engineering Files Report Supplement [herein known as the Engineering Files (EF)] is to provide the surface design data needed by the Environmental Impact Statement (EIS) contractor to prepare the EIS and evaluate options and alternatives. This document is based on the Repository Surface Design Engineering Files Report, Revision 03 (CRWMS M and O 1999f) (EF Rev 03). Where facility and system designs have been changed for the Site Recommendation (SR) effort they are described in this report. EIS information provided in this report includes the following: (1) Description of program phases; there are no changes that impact this report. (2) A description of the major design requirements and assumptions that drive the surface facilities reference design is provided herein (Section 2.2), including the surface design resulting from recommendations regarding Enhanced Design Alternative (EDA) II, as discussed in the License Application Design Section Report (CRWMS M and O 1999d), and changes to the waste stream. See Section 2, Table 2-2, for the SR waste stream. (3) The major design requirements and assumptions that drive the surface facilities reference design are by reference to EF Rev 03; there are no changes that impact this report. (4) Description of the reference design concept and existing site conditions is by reference to EF Rev 03 (including Table 4-1, which is not included in this supplement); there are no changes that impact this report. (5) Description of alternative design cases is by reference to EF Rev 03; there are no changes that impact this report. (6) Description of optional inventory modules is by reference to EF Rev 03; there are no changes that impact this report. (7) Tabular summary level engineering values (i.e., staffing, wastes, emissions, resources, and land use) for the reference design and the alternative design cases that address construction, emplacement operations, caretaker operations, and

  12. Alternate technologies for MRS design

    International Nuclear Information System (INIS)

    Smith, R.I.; Triplett, M.B.; Ashton, W.B.; Kelly, W.S.

    1984-01-01

    This paper describes the process conducted by the Pacific Northwest Laboratory (PNL) to evaluate candidate MRS concepts and to recommend the two most preferred concepts. The eight concepts studied are: metal cask (stationary and transportable); concrete cask (silo); concrete cask-in-trench; field drywell; tunnel drywell; open cycle vault; closed cycle vault; and tunnel rack vault. To achieve a more equitable comparison of the concepts, conceptual design analyses were performed for the candidate concepts using a common set of specified design requirements selected with consideration of the MRS mission. Using this normalized conceptual design information, the MRS concepts were evaluated and compared on the basis of their relative performance on seven criteria: flexibility, concept maturity, cost, environmental impacts, safety and licensing, socioeconomic impacts, and siting requirements. These seven criteria were judged to form a reasonable and complete basis for the evaluation of MRS concepts' ability to satisfy the MRS mission requirements. 5 references, 8 figures, 1 table

  13. Test results of distributed ion pump designs for the PEP-II Asymmetric B-Factory collider

    Energy Technology Data Exchange (ETDEWEB)

    Calderon, M.; Holdener, F.; Peterson, D. [Lawrence Livermore National Lab., CA (United States)] [and others

    1994-07-01

    The testing facility measurement methods and results of prototype distributed ion pump (DIP) designs for the PEP-II B-Factory High Energy Ring are presented. Two basic designs with 5- or 7-anode plates were tested at LLNL with penning cell sizes of 15, 18, and 21 mm. Direct comparison of 5- and 7-plate anodes with 18 mm holes shows increased pumping speed with the 7-plate design. The 5-plate, 18 mm and 7-plate, 15 mm designs both gave an average pumping speed of 135 1/s/m at 1 {times} 10{sup {minus}8} Torr nitrogen base pressure in a varying 0.18 T peak B-field. Comparison of the three hole sizes indicates that cells smaller than the 15 mm tested can be efficiently used to obtain higher pumping speeds for the same anode plate sizes used.

  14. Test results of distributed ion pump designs for the PEP-II Asymmetric B-Factory collider

    International Nuclear Information System (INIS)

    Calderon, M.; Holdener, F.; Peterson, D.

    1994-07-01

    The testing facility measurement methods and results of prototype distributed ion pump (DIP) designs for the PEP-II B-Factory High Energy Ring are presented. Two basic designs with 5- or 7-anode plates were tested at LLNL with penning cell sizes of 15, 18, and 21 mm. Direct comparison of 5- and 7-plate anodes with 18 mm holes shows increased pumping speed with the 7-plate design. The 5-plate, 18 mm and 7-plate, 15 mm designs both gave an average pumping speed of 135 1/s/m at 1 x 10 -8 Torr nitrogen base pressure in a varying 0.18 T peak B-field. Comparison of the three hole sizes indicates that cells smaller than the 15 mm tested can be efficiently used to obtain higher pumping speeds for the same anode plate sizes used

  15. Expansion design for a Laboratory of Radioactive Sources Handling type II, class B

    International Nuclear Information System (INIS)

    Sanchez S, P. S.

    2014-01-01

    This work presents the expansion design of the Radioactive Wastes Research Laboratory (RWRL) installation authorized by the Comision Nacional de Seguridad Nuclear y Salvaguardias (Mexico) as type II class C, to manage 40 different radionuclides, approximately. The RWRL has 4 areas at the present time: a laboratory of instrumental analysis, one of radioactive material processes, other of counting and a chemical reagents stock, which is not integrated to the operation license of the RWRL. With the purpose of expanding the operation license of the RWRL to an installation type II class B, to manage until 370 MBq of high radio toxicity radionuclides, is presented in this work an expansion proposal of the RWRL. The expansion proposal is based in: (1) the Mexican Nuclear Standard NOM-027-Nucl-1996 for installations type II class B, (2) the current distribution of water, light, electricity, extraction, gas, air and vacuum services of RWRL, and (3) the available areas inside the building that the RWRL occupies. The proposal contemplates the creation of additional new areas for RWRL: 3 laboratories, 2 dressing rooms, 2 bathrooms and 2 warehouses, one for radioactive materials and another for reagents chemical radiologically inactive. Architectural, electric, hydraulic, extraction and gas planes corresponding to the expansion of RWRL were realized. Inside the proposal the budget required to carry out the mentioned expansion is also presented. (Author)

  16. Exploring Alternative Fuels in Middle Schools

    Science.gov (United States)

    Donley, John F.; Stewardson, Gary A.

    2010-01-01

    Alternative energy sources have become increasingly important as the production of domestic oil has declined and dependence on foreign oil has increased. Historically, there have been four time periods during which the United States was in fact crippled by oil shortages. These time periods include: (1) the early 1900s; (2) World War II; (3) the…

  17. Repository Planning, Design, and Engineering: Part II-Equipment and Costing.

    Science.gov (United States)

    Baird, Phillip M; Gunter, Elaine W

    2016-08-01

    Part II of this article discusses and provides guidance on the equipment and systems necessary to operate a repository. The various types of storage equipment and monitoring and support systems are presented in detail. While the material focuses on the large repository, the requirements for a small-scale startup are also presented. Cost estimates and a cost model for establishing a repository are presented. The cost model presents an expected range of acquisition costs for the large capital items in developing a repository. A range of 5,000-7,000 ft(2) constructed has been assumed, with 50 frozen storage units, to reflect a successful operation with growth potential. No design or engineering costs, permit or regulatory costs, or smaller items such as the computers, software, furniture, phones, and barcode readers required for operations have been included.

  18. User-Centered Design and Augmentative and Alternative Communication Apps for Children With Autism Spectrum Disorders

    Directory of Open Access Journals (Sweden)

    Margaret Lubas

    2014-05-01

    Full Text Available Communication difficulties are among the most frequent characteristics of children with autism spectrum disorders (ASD. Lack of communication can have a significant impact on the child’s life. Augmentative and alternative communication (AAC apps are a common form of AAC interventions that involve a combination of affordable technology with software that can be utilized to assist with communication. While AAC apps have been found to have some impact on improving the communication skills of children with ASD, current research exploring this topic is still limited. Focusing on the design process of AAC apps may provide better insight into improving clinical outcomes and user success. The user-centered design process incorporates a continuous cycle of user feedback to help inform and improve the functions and the capabilities of the technology, and it is an essential component in AAC app development. This article outlines how the user-centered design process could be adopted for the development of AAC apps for children with ASD.

  19. The Pediatric Obsessive-Compulsive Disorder Treatment Study II: rationale, design and methods

    Directory of Open Access Journals (Sweden)

    March John S

    2009-01-01

    Full Text Available Abstract This paper presents the rationale, design, and methods of the Pediatric Obsessive-Compulsive Disorder Treatment Study II (POTS II, which investigates two different cognitive-behavior therapy (CBT augmentation approaches in children and adolescents who have experienced a partial response to pharmacotherapy with a serotonin reuptake inhibitor for OCD. The two CBT approaches test a "single doctor" versus "dual doctor" model of service delivery. A specific goal was to develop and test an easily disseminated protocol whereby child psychiatrists would provide instructions in core CBT procedures recommended for pediatric OCD (e.g., hierarchy development, in vivo exposure homework during routine medical management of OCD (I-CBT. The conventional "dual doctor" CBT protocol consists of 14 visits over 12 weeks involving: (1 psychoeducation, (2, cognitive training, (3 mapping OCD, and (4 exposure with response prevention (EX/RP. I-CBT is a 7-session version of CBT that does not include imaginal exposure or therapist-assisted EX/RP. In this study, we compared 12 weeks of medication management (MM provided by a study psychiatrist (MM only with two types of CBT augmentation: (1 the dual doctor model (MM+CBT; and (2 the single doctor model (MM+I-CBT. The design balanced elements of an efficacy study (e.g., random assignment, independent ratings with effectiveness research aims (e.g., differences in specific SRI medications, dosages, treatment providers. The study is wrapping up recruitment of 140 youth ages 7–17 with a primary diagnosis of OCD. Independent evaluators (IEs rated participants at weeks 0,4,8, and 12 during acute treatment and at 3,6, and 12 month follow-up visits. Trial registration NCT00074815

  20. RF Coupler Design for the TRIUMF ISAC-II Superconducting Quarter Wave Resonator

    CERN Document Server

    Poirier, R L; Harmer, P; Laxdal, R E; Mitra, A K; Sekatchev, I; Waraich, B; Zvyagintsev, V

    2004-01-01

    An RF Coupler for the ISAC-II medium beta (β=0.058 and 0.071) superconducting quarter wave resonators was designed and tested at TRIUMF. The main goal of this development was to achieve stable operation of superconducting cavities at high acceleration gradients and low thermal load to the helium refrigeration system. The cavities will operate at 6 MV/m acceleration gradient in overcoupled mode at a forward power 200 W at 106 MHz. The overcoupling provides ±20 Hz cavity bandwidth, which improves the stability of the RF control system for fast helium pressure fluctuations, microphonics and environmental noise. Choice of materials, cooling with liquid nitrogen, aluminum nitride RF window and thermal shields insure a small thermal load on the helium refrigeration system by the Coupler. An RF finger contact which causedμdust in the coupler housing was eliminated without any degradation of the coupler performance. RF and thermal calculations, design and test results on the coupler are p...

  1. Ba{anti B}ar status report on the design of a detector for the study of CP violation at PEP-II at SLAC

    Energy Technology Data Exchange (ETDEWEB)

    1993-06-01

    Experiments designed to measure CP-violating asymmetries in the B meson system must emphasize exclusive state reconstruction with the highest possible resolution and efficiency. In the case of B{sup 0} mesons produced in pairs at the {Upsilon}(4S) resonance at an asymmetric e{sup +}e{sup {minus}} storage ring, this capability must be accompanied by precise vertex reconstruction in the direction of the e{sup +}e{sup {minus}} beams (henceforth the z direction). These are difficult requirements, beyond the scope of any existing storage ring detector. The challenge of designing an asymmetric storage ring capable of producing the large number of neutral B meson pairs required to measure CP-violating asymmetries in decays to CP eigenstates has been handsomely met in the PEP-II design. As the first asymmetric e{sup +}e{sup {minus}} storage ring, PEP-II presents a novel set of experimental challenges to a 4{pi} detector. This Status Report describes the design of a new detector fully capable of exploiting the physics opportunities provided by PEP-II.

  2. Experience with advanced driver fuels in EBR-II

    International Nuclear Information System (INIS)

    Lahm, C.E.; Koenig, J.F.; Pahl, R.G.; Porter, D.L.; Crawford, D.C.

    1992-01-01

    The Experimental Breeder Reactor II (EBR-II) is a complete nuclear power plant, incorporating a pool-type liquid-metal reactor (LMR) with a fuel-power thermal output of 62.5 MW and an electrical output of 20 MW. Initial criticality was in 1961, utilizing a metallic driver fuel design called the Mark-I. The fuel design has evolved over the last 30 yr, and significant progress has been made on improving performance. The first major innovations were incorporated into the Mark-II design, and burnup then increased dramatically. This design performed successfully, and fuel element lifetime was limited by subassembly hardware performance rather than the fuel element itself. Transient performance of the fuel was also acceptable and demonstrated the ability of EBR-II to survive severe upsets such as a loss of flow without scram. In the mid 1980s, with renewed interest in metallic fuels and Argonne's integral fast reactor (IFR) concept, the Mark-II design was used as the basis for new designs, the Mark-III and Mark-IV. In 1987, the Mark-III design began qualification testing to become a driver fuel for EBR-II. This was followed in 1989 by the Mark-IIIA and Mark-IV designs. The next fuel design, the Mark-V, is being planned to demonstrate the utilization of recycled fuel. The fuel cycle facility attached to EBR-II is being refurbished to produce pyroprocessed recycled fuel as part of the demonstration of the IFR

  3. Flued head replacement alternatives

    International Nuclear Information System (INIS)

    Smetters, J.L.

    1987-01-01

    This paper discusses flued head replacement options. Section 2 discusses complete flued head replacement with a design that eliminates the inaccessible welds. Section 3 discusses alternate flued head support designs that can drastically reduce flued head installation costs. Section 4 describes partial flued head replacement designs. Finally, Section 5 discusses flued head analysis methods. (orig./GL)

  4. Syntheses, spectroscopic and thermal analyses of cyanide bridged heteronuclear polymeric complexes: [M(L)2Ni(CN)4]n (Ldbnd N-methylethylenediamine or N-ethylethylenediamine; Mdbnd Ni(II), Cu(II), Zn(II) or Cd(II))

    Science.gov (United States)

    Karaağaç, Dursun; Kürkçüoğlu, Güneş Süheyla

    2016-02-01

    Polymeric tetracyanonickelate(II) complexes of the type [M(L)2Ni(CN)4]n (Ldbnd N-methylethylenediamine (men) or N-ethylethylenediamine (neen); Mdbnd Ni(II), Cu(II), Zn(II) or Cd(II)) have been prepared and characterized by FT-IR, Raman spectroscopy, thermal and elemental analysis techniques. Additionally, FT-IR and Raman spectral analyses of men and neen have experimentally and theoretically investigated in the range of 4000-250 cm-1. The corresponding vibration assignments of men and neen are performed by using B3LYP density functional theory (DFT) method together with 6-31 G(d) basis set. The spectral features of the complexes suggest that the coordination environment of the M(II) ions are surrounded by the two symmetry related men and neen ligands and the two symmetry related N atom of cyanide groups, whereas the Ni(II) atoms are coordinated with a square-planar to four C atoms of the cyanide groups. Polymeric structures of the complexes consist of one dimensional alternative chains of [M(L)2]2+ and [Ni(CN)4]2- moieties. The thermal decompositions in the temperature range 30-700 °C of the complexes were investigated in the static air atmosphere.

  5. Up-Rating - An Alternative Approach to Meeting Future Power Demands - Exploitation of Design Margins

    Energy Technology Data Exchange (ETDEWEB)

    Bruce, Barnaby; Schwarz, Thomas [AREVA NP GmbH, Freyeslebenstr. 1, 91058 Erlangen (Germany)

    2008-07-01

    Up-rating is a world-wide implemented approach that takes advantage of increased calculation and analytic abilities developed since commissioning and applies them to old plants. In doing so, what would possibly be considered today as over-engineered design margins are exploited and plant performance is improved, without necessarily involving extensive modifications or replacement of hardware. It is therefore a short-term alternative, compared to new plants, with little change in environmental ramifications for power production capacity gained. Up-rating is also more accepted by the wider community and licensing authorities, thus complimenting the building of new plants. The 10% thermal up-rating of the nuclear power plant at Almaraz, Spain, requires a comprehensive reanalysis of all power components. This paper focuses on those measures required to ensure the performance of the steam generators at increased load as an example of design margin exploitation in such crucial components. (authors)

  6. Design of Ru(II) sensitizers endowed by three anchoring units for adsorption mode and light harvesting optimization

    International Nuclear Information System (INIS)

    Lobello, Maria Grazia; Fantacci, Simona; Manfredi, Norberto; Coluccini, Carmine; Abbotto, Alessandro; Nazeeruddin, Mohammed K.; De Angelis, Filippo

    2014-01-01

    We report the design, synthesis and computational investigation of a class of Ru(II)-dyes based on mixed bipyridine ligands for use in dye-sensitized solar cells. These dyes are designed to preserve the optimal anchoring mode of the prototypical N719 sensitizer by three carboxylic groups, yet allowing for tunable optimization of their electronic and optical properties by selective substitution at one of the 4-4′ positions of a single bipyridine ligand with π-excessive heteroaromatic groups. We used Density Functional Theory/Time Dependent Density Functional Theory calculations to analyze the electronic structure and optical properties of the dye and to investigate the dye adsorption mode on a TiO 2 nanoparticle model. Our results show that we are effectively able to introduce three carboxylic anchoring units into the dye and achieve at the same time an enhanced dye light harvesting, demonstrating the design concept. As a drawback of this type of dyes, the synthesis leads to a mixture of dye isomers, which are rather tedious to separate. - Highlights: • We designed heteroleptic Ru(II) sensitizers with three carboxylic anchoring groups. • The three carboxylic anchoring groups are essential for high open circuit potentials. • Introduction of the mixed bipyridine ligand increases the dye light absorption. • Computational simulations confirm the three anchoring sites on TiO 2

  7. Design of Ru(II) sensitizers endowed by three anchoring units for adsorption mode and light harvesting optimization

    Energy Technology Data Exchange (ETDEWEB)

    Lobello, Maria Grazia; Fantacci, Simona [Computational Laboratory for Hybrid/Organic Photovoltaics (CLHYO), Istituto CNR di Scienze e Tecnologie Molecolari, Via elce di Sotto 8, I-06213 Perugia (Italy); Manfredi, Norberto; Coluccini, Carmine [Department of Materials Science and Milano-Bicocca Solar Energy Research Center-MIB-Solar, University of Milano-Bicocca and INSTM, Via Cozzi 53, I-20125 Milano (Italy); Abbotto, Alessandro, E-mail: alessandro.abbotto@unimib.it [Department of Materials Science and Milano-Bicocca Solar Energy Research Center-MIB-Solar, University of Milano-Bicocca and INSTM, Via Cozzi 53, I-20125 Milano (Italy); Nazeeruddin, Mohammed K., E-mail: mdkhaja.nazeeruddin@epfl.ch [Laboratory for Photonics and Interfaces, Station 6, Institute of Chemical Sciences and Engineering, School of Basic Sciences, Swiss Federal Institute of Technology, CH-1015 Lausanne (Switzerland); De Angelis, Filippo, E-mail: filippo@thch.unipg.it [Computational Laboratory for Hybrid/Organic Photovoltaics (CLHYO), Istituto CNR di Scienze e Tecnologie Molecolari, Via elce di Sotto 8, I-06213 Perugia (Italy)

    2014-06-02

    We report the design, synthesis and computational investigation of a class of Ru(II)-dyes based on mixed bipyridine ligands for use in dye-sensitized solar cells. These dyes are designed to preserve the optimal anchoring mode of the prototypical N719 sensitizer by three carboxylic groups, yet allowing for tunable optimization of their electronic and optical properties by selective substitution at one of the 4-4′ positions of a single bipyridine ligand with π-excessive heteroaromatic groups. We used Density Functional Theory/Time Dependent Density Functional Theory calculations to analyze the electronic structure and optical properties of the dye and to investigate the dye adsorption mode on a TiO{sub 2} nanoparticle model. Our results show that we are effectively able to introduce three carboxylic anchoring units into the dye and achieve at the same time an enhanced dye light harvesting, demonstrating the design concept. As a drawback of this type of dyes, the synthesis leads to a mixture of dye isomers, which are rather tedious to separate. - Highlights: • We designed heteroleptic Ru(II) sensitizers with three carboxylic anchoring groups. • The three carboxylic anchoring groups are essential for high open circuit potentials. • Introduction of the mixed bipyridine ligand increases the dye light absorption. • Computational simulations confirm the three anchoring sites on TiO{sub 2}.

  8. Rapid Prototyping: An Alternative Instructional Design Strategy.

    Science.gov (United States)

    Tripp, Steven D.; Bichelmeyer, Barbara

    1990-01-01

    Discusses the nature of instructional design and describes rapid prototyping as a feasible model for instructional system design (ISD). The use of prototyping in software engineering is described, similarities between software design and instructional design are discussed, and an example is given which uses rapid prototyping in designing a…

  9. Pb(II) and Hg(II) binding to $\\textit{de novo}$ designed proteins studied by $^{204m}$Pb- and $^{199m}$Hg-Perturbed Angular Correlation of $\\gamma$-rays (PAC) spectroscopy : Clues to heavy metal toxicity

    CERN Multimedia

    2002-01-01

    $\\textit{De novo}$ design of proteins combined with PAC spectroscopy offers a unique and powerful approach to the study of fundamental chemistry of heavy metal-protein interactions, and thus of the mechanisms underlying heavy metal toxicity. In this project we focus on Pb(II) and Hg(II) binding to designed three stranded coiled coil proteins with one or two binding sites, mimicking a variety of naturally occurring thiolate-rich metal ion binding sites in proteins. The $^{204m}$Pb- and $^{199m}$Hg-PAC experiments will complement data already recorded with EXAFS, NMR, UV-Vis and CD spectroscopies.

  10. Conceptual design of a superconducting coil system cooled by forced flow HE II for the central column of net

    International Nuclear Information System (INIS)

    Ciazynski, D.; Duchateau, J.L.; Turck, B.

    1987-01-01

    In order to increase the maximum flux sweep, a present trend is to design ohmic coils producing fields as high as II teslas. In Niobium-Titanium, critical current densities of 10 9 A/m 2 at 1.8 K under a field of 11 teslas are now claimed by several manufacturers. This in addition enables to make use of the outstanding cooling properties of He II. The forced flow technics can again be envisaged for He II to remove the heat load. Two solutions are investigated. The first one uses a 40 kA cable wound in double pancakes. The second one makes use of several conductors layer wound and current supplied in parallel

  11. DESIGN AND DEVELOPMENT OF AUGMENTATIVE AND ALTERNATIVE DIGITAL HOME CONTROL INTERFACE

    Directory of Open Access Journals (Sweden)

    Matteo Pastorino

    2013-05-01

    Full Text Available An inquiry of the National Statistics Institute of Spain shows that 74% of the Spanish population with disabilities suffers some kind of limitation performing Daily Basic Activities, while 1.39 million cannot perform them at all without the assistance of specialized personnel. Digital Home Systems could mitigate disabled people’s difficulties to carry out those activities, giving the opportunity to manage home appliances through a single control. Digital Home Systems have to provide specific and adapted control interfaces based on Augmentative and Alternative Communication languages in order to be an efficient solution to the problem and to allow most vulnerable groups of people with disabilities to reach the highest level of autonomy.  This paper describes a Digital Home Interface capable of adapting layouts, styles and contents to device capability, user preferences and appliances’ features; designed with a combination of web technologies, standard languages for abstract interface definition and AAC systems.

  12. Global Energy Issues and Alternate Fueling

    Science.gov (United States)

    Hendricks, Robert C.

    2007-01-01

    This viewgraph presentation describes world energy issues and alternate fueling effects on aircraft design. The contents include: 1) US Uses about 100 Quad/year (1 Q = 10(exp 15) Btu) World Energy Use: about 433 Q/yr; 2) US Renewable Energy about 6%; 3) Nuclear Could Grow: Has Legacy Problems; 4) Energy Sources Primarily NonRenewable Hydrocarbon; 5) Notes; 6) Alternate Fuels Effect Aircraft Design; 7) Conventional-Biomass Issue - Food or Fuel; 8) Alternate fuels must be environmentally benign; 9) World Carbon (CO2) Emissions Problem; 10) Jim Hansen s Global Warming Warnings; 11) Gas Hydrates (Clathrates), Solar & Biomass Locations; 12) Global Energy Sector Response; 13) Alternative Renewables; 14) Stratospheric Sulfur Injection Global Cooling Switch; 15) Potential Global Energy Sector Response; and 16) New Sealing and Fluid Flow Challenges.

  13. The Information Infrastructures Design Space

    DEFF Research Database (Denmark)

    Henningsson, Stefan; Rapti, Charikleia; Jensen, Thomas

    2017-01-01

    This paper develops a framework for characterising the design space of Information Infrastructures (IIs). Existing research has generally sought to unravel the convergent characteristics and mechanisms uniting IIs across a wide range of manifestations. In this research, we explore this divergence...... within the II design space. We do so by reviewing the II literature, focusing on the two domains of design situation and design resolution. Design situation refers to the relevant dimensions of the context in which an II is employed. Design resolution covers the dimensions along which the socio......-technical constituents can be assembled to form an effective solution. The resulting framework allows for the comparing and contrasting of II initiatives, and contributes towards a cumulative knowledge process aimed at a more refined understanding of how an II can be configured to address the specific problem at hand....

  14. LCLS II Design

    Energy Technology Data Exchange (ETDEWEB)

    Bharadwaj, V.

    2005-01-31

    A one-day workshop was held on July 21st, 1998 to consider upgrade paths to the existing LCLS design with a view to making a facility with multiple FEL and spontaneous synchrotron radiation beamlines. The agenda, working groups and participants in this workshop are listed in Appendix 1. This technical note summarizes the ideas generated by this workshop.

  15. Alternative Fuels Data Center: Publications

    Science.gov (United States)

    Windstars; 14) and the use of alternative fuel vehicles at the Olympics. Alternative Fuels In Trucking, Vol and their economic and environmental benefits. This report is designed to share the experiences and National Academy of Engineering suggested that 'DOE might have its greatest impact by leading the private

  16. Design and hardware alternatives for a Safety-Parameter Display System

    International Nuclear Information System (INIS)

    Honeycutt, F.; Merten, W.T.; Roy, G.M.; Segraves, E.; Stone, G.P.

    1981-05-01

    The SPDS is a dedicated control room operator aid and is viewed as an important safety improvement within the context of other post-TMI fixes. Hardware configurations and components to implement the NSAC display format of a Safety Parameter Display System (SPDS) are evaluated. The evaluation was made on the basis of five alternative hardware configurations which use commercially available components. Four of the alternatives use computer/video display architecture. The fifth alternative is a simple hardwired system which uses strip chart recorders. SPDS regulatory requirements are defined by NUREG 0696. Overall feasibility of the NSAC concept was evaluated in terms of performance, reliability, cost, licensability, and flexibility. The flexibility evaluation relates to the ability to handle other display formats, the data acquisition needs of the other emergency facilities and the impact of expected future NRC requirements

  17. Accident consequences analysis of the HYLIFE-II inertial fusion energy power plant design

    Energy Technology Data Exchange (ETDEWEB)

    Reyes, S. E-mail: reyessuarezl@llnl.gov; Latkowski, J.F.; Gomez del Rio, J.; Sanz, J

    2001-05-21

    Previous studies of the safety and environmental aspects of the HYLIFE-II inertial fusion energy power plant design have used simplistic assumptions in order to estimate radioactivity releases under accident conditions. Conservatisms associated with these traditional analyses can mask the actual behavior of the plant and have revealed the need for more accurate modeling and analysis of accident conditions and radioactivity mobilization mechanisms. In the present work, computer codes traditionally used for magnetic fusion safety analyses (CHEMCON, MELCOR) have been applied for simulating accident conditions in a simple model of the HYLIFE-II IFE design. Here we consider a severe loss of coolant accident (LOCA) in conjunction with simultaneous failures of the beam tubes (providing a pathway for radioactivity release from the vacuum vessel towards the confinement) and of the two barriers surrounding the chamber (inner shielding and confinement building itself). Even though confinement failure would be a very unlikely event it would be needed in order to produce significant off-site doses. CHEMCON code allows calculation of long-term temperature transients in fusion reactor first wall, blanket, and shield structures resulting from decay heating. MELCOR is used to simulate a wide range of physical phenomena including thermal-hydraulics, heat transfer, aerosol physics and fusion product transport and release. The results of these calculations show that the estimated off-site dose is less than 5 mSv (0.5 rem), which is well below the value of 10 mSv (1 rem) given by the DOE Fusion Safety Standards for protection of the public from exposure to radiation during off-normal conditions.

  18. Accident consequences analysis of the HYLIFE-II inertial fusion energy power plant design

    Science.gov (United States)

    Reyes, S.; Latkowski, J. F.; Gomez del Rio, J.; Sanz, J.

    2001-05-01

    Previous studies of the safety and environmental aspects of the HYLIFE-II inertial fusion energy power plant design have used simplistic assumptions in order to estimate radioactivity releases under accident conditions. Conservatisms associated with these traditional analyses can mask the actual behavior of the plant and have revealed the need for more accurate modeling and analysis of accident conditions and radioactivity mobilization mechanisms. In the present work, computer codes traditionally used for magnetic fusion safety analyses (CHEMCON, MELCOR) have been applied for simulating accident conditions in a simple model of the HYLIFE-II IFE design. Here we consider a severe loss of coolant accident (LOCA) in conjunction with simultaneous failures of the beam tubes (providing a pathway for radioactivity release from the vacuum vessel towards the confinement) and of the two barriers surrounding the chamber (inner shielding and confinement building itself). Even though confinement failure would be a very unlikely event it would be needed in order to produce significant off-site doses. CHEMCON code allows calculation of long-term temperature transients in fusion reactor first wall, blanket, and shield structures resulting from decay heating. MELCOR is used to simulate a wide range of physical phenomena including thermal-hydraulics, heat transfer, aerosol physics and fusion product transport and release. The results of these calculations show that the estimated off-site dose is less than 5 mSv (0.5 rem), which is well below the value of 10 mSv (1 rem) given by the DOE Fusion Safety Standards for protection of the public from exposure to radiation during off-normal conditions.

  19. NSGA-II Algorithm with a Local Search Strategy for Multiobjective Optimal Design of Dry-Type Air-Core Reactor

    Directory of Open Access Journals (Sweden)

    Chengfen Zhang

    2015-01-01

    Full Text Available Dry-type air-core reactor is now widely applied in electrical power distribution systems, for which the optimization design is a crucial issue. In the optimization design problem of dry-type air-core reactor, the objectives of minimizing the production cost and minimizing the operation cost are both important. In this paper, a multiobjective optimal model is established considering simultaneously the two objectives of minimizing the production cost and minimizing the operation cost. To solve the multi-objective optimization problem, a memetic evolutionary algorithm is proposed, which combines elitist nondominated sorting genetic algorithm version II (NSGA-II with a local search strategy based on the covariance matrix adaptation evolution strategy (CMA-ES. NSGA-II can provide decision maker with flexible choices among the different trade-off solutions, while the local-search strategy, which is applied to nondominated individuals randomly selected from the current population in a given generation and quantity, can accelerate the convergence speed. Furthermore, another modification is that an external archive is set in the proposed algorithm for increasing the evolutionary efficiency. The proposed algorithm is tested on a dry-type air-core reactor made of rectangular cross-section litz-wire. Simulation results show that the proposed algorithm has high efficiency and it converges to a better Pareto front.

  20. Results of developing and problems of further improvements for WWER-1000 FA of alternative design

    International Nuclear Information System (INIS)

    Molchanov, V.L.; Panyushkin, A.K.; Zheleznyak, V.M.; Samojlov, O.B.; Kuul', V.S.; Kurylev, V.I.

    2001-01-01

    A new fuel assembly of alternative design (FAA) is created for a WWER-1000 reactor which is characteristic of dimensional stability on operation. The FAA includes a frame of 15 alloy Eh-110 spacer grids spot welded to 6 alloy Eh-635 angle sections. In-core tests show that the FAA is stable to form changing. It is concluded that the FAA can serve as a basis for development of promising fuel cycle with high burnups, specifically, for a 4 year cycle with the use of uranium-gadolinium fuel [ru

  1. Test results of pre-production prototype distributed ion pump design for the PEP-II Asymmetric B-Factory collider

    Energy Technology Data Exchange (ETDEWEB)

    Holdener, F.R.; Behne, D.; Hathaway, D. [and others

    1995-04-24

    We have built and tested a plate-type pre-production distributed Ion Pump (DIP) for the PEP-II B-Factory High Energy Ring (HER). The design has been an earlier design to use less materials and to costs. Penning cell hole sizes of 15, 18, and 21 mm have been tested in a uniform magnetic field of 0.18 T to optimize pumping speed. The resulting final DIP design consisting of a 7-plate, 15 mm basic cell size anode was magnetic field of the HER dipole. A description of the final optimized DIP design will be presented along with the test results of the pumping speed measurements.

  2. A comparative analysis for multiattribute selection among renewable energy alternatives using fuzzy axiomatic design and fuzzy analytic hierarchy process

    Energy Technology Data Exchange (ETDEWEB)

    Kahraman, Cengiz; Kaya, Ihsan; Cebi, Selcuk [Istanbul Technical University, Department of Industrial Engineering, 34367, Macka-Istanbul (Turkey)

    2009-10-15

    Renewable energy is the energy generated from natural resources such as sunlight, wind, rain, tides and geothermal heat which are renewable. Energy resources are very important in perspective of economics and politics for all countries. Hence, the selection of the best alternative for any country takes an important role for energy investments. Among decision-making methodologies, axiomatic design (AD) and analytic hierarchy process (AHP) are often used in the literature. The fuzzy set theory is a powerful tool to treat the uncertainty in case of incomplete or vague information. In this paper, fuzzy multicriteria decision- making methodologies are suggested for the selection among renewable energy alternatives. The first methodology is based on the AHP which allows the evaluation scores from experts to be linguistic expressions, crisp, or fuzzy numbers, while the second is based on AD principles under fuzziness which evaluates the alternatives under objective or subjective criteria with respect to the functional requirements obtained from experts. The originality of the paper comes from the fuzzy AD application to the selection of the best renewable energy alternative and the comparison with fuzzy AHP. In the application of the proposed methodologies the most appropriate renewable energy alternative is determined for Turkey. (author)

  3. Type II dens evaginatus of maxillary central incisor: An alternative approach

    Directory of Open Access Journals (Sweden)

    Mansour Alrejaie

    2015-01-01

    Full Text Available Dens evaginatus is the developmental anomaly of tooth that exhibits protrusion of a tubercle from occlusal surfaces of premolar, and lingual surfaces of maxillary central incisor and lateral incisors. Dens evaginatus is common in Caucasian population. Saudi Arabia is also well evidenced of such cases. These tubercles have an enamel layer covering dentin core containing a thin extension of pulp. These cusp-like protrusions are susceptible to pulp exposure from wear or fracture because of malocclusion. Type II dens evaginatus involves normal pulp with immature root apex. Materials to enhance the pulpal recession or pulpotomy procedures indicated in such cases require long time and efforts to ensure pulpal recession or root maturity, respectively. Also prolonged treatment has risk of fracture of the cusp and reinfection and requires patient commitment for the follow-up procedures. Present case describes the use of mineral trioxide aggregate (MTA in type II dens evaginatus of maxillary central incisor.

  4. SustainPro - A tool for systematic process analysis, generation and evaluation of sustainable design alternatives

    DEFF Research Database (Denmark)

    Carvalho, Ana; Matos, Henrique A.; Gani, Rafiqul

    2013-01-01

    the user through the necessary steps according to work-flow of the implemented methodology. At the end the design alternatives, are evaluated using environmental impact assessment tools and safety indices. The extended features of the methodology incorporate Life Cycle Assessment analysis and economic....... The software tool is based on the implementation of an extended systematic methodology for sustainable process design (Carvalho et al. 2008 and Carvalho et al. 2009). Using process information/data such as the process flowsheet, the associated mass / energy balance data and the cost data, SustainPro guides...... analysis. The application and the main features of SustainPro are illustrated through a case study of ß-Galactosidase production....

  5. Virtual screening filters for the design of type II p38 MAP kinase inhibitors: a fragment based library generation approach.

    Science.gov (United States)

    Badrinarayan, Preethi; Sastry, G Narahari

    2012-04-01

    In this work, we introduce the development and application of a three-step scoring and filtering procedure for the design of type II p38 MAP kinase leads using allosteric fragments extracted from virtual screening hits. The design of the virtual screening filters is based on a thorough evaluation of docking methods, DFG-loop conformation, binding interactions and chemotype specificity of the 138 p38 MAP kinase inhibitors from Protein Data Bank bound to DFG-in and DFG-out conformations using Glide, GOLD and CDOCKER. A 40 ns molecular dynamics simulation with the apo, type I with DFG-in and type II with DFG-out forms was carried out to delineate the effects of structural variations on inhibitor binding. The designed docking-score and sub-structure filters were first tested on a dataset of 249 potent p38 MAP kinase inhibitors from seven diverse series and 18,842 kinase inhibitors from PDB, to gauge their capacity to discriminate between kinase and non-kinase inhibitors and likewise to selectively filter-in target-specific inhibitors. The designed filters were then applied in the virtual screening of a database of ten million (10⁷) compounds resulting in the identification of 100 hits. Based on their binding modes, 98 allosteric fragments were extracted from the hits and a fragment library was generated. New type II p38 MAP kinase leads were designed by tailoring the existing type I ATP site binders with allosteric fragments using a common urea linker. Target specific virtual screening filters can thus be easily developed for other kinases based on this strategy to retrieve target selective compounds. Copyright © 2012 Elsevier Inc. All rights reserved.

  6. Aplicação e comparação dos métodos Electre II e Promethee II como ferramentas de auxílio à tomada de decisões hospitalares

    Directory of Open Access Journals (Sweden)

    Carlos Firmino Durães Arcanjo

    2015-01-01

    Full Text Available Several methods used in Operations Research (OR have been gaining notice both in industry and services sectors, especially as pertains to hospital services. This article seeks to compare two outranking methods: The Preference Ranking Organization Method for Enrichment Evaluation (PROMETHEE II and Elimination Et Choix Traduisant la Realité (ELECTRE II, implemented in a Brazilian hospital emergency service in order to show the advantages and disadvantages of each method. Comparisons between the rankings clearly show the distinction in the order, although both had placed the alternative “Discipline Medical Staff” in first position. The results showed that the Promethee II algorithm avoided a tie between alternatives.

  7. Modification Design of Petrol Engine for Alternative Fueling using Compressed Natural Gas

    Directory of Open Access Journals (Sweden)

    Eliezer Uchechukwu Okeke

    2013-04-01

    Full Text Available This paper is on the modification design of petrol engine for alternative fuelling using Compressed Natural Gas (CNG. It provides an analytical background in the modification design process. A petrol engine Honda CR-V 2.0 auto which has a compression ratio of 9.8 was selected as case study. In order for this petrol engine to run on CNG, its compression had to be increased. An optimal compression ratio of 11.97 was computed using the standard temperature-specific volume relationship for an isentropic compression process. This computation of compression ratio is based on an inlet air temperature of 30oC (representative of tropical ambient condition and pre-combustion temperature of 540oC (corresponding to the auto-ignition temperature of CNG. Using this value of compression ratio, a dimensional modification Quantity =1.803mm was obtained using simple geometric relationships. This value of 1.803mm is needed to increase the length of the connecting rod, the compression height of the piston or reducing the sealing plate’s thickness. After the modification process, a CNG engine of air standard efficiency 62.7% (this represents a 4.67% increase over the petrol engine, capable of a maximum power of 83.6kW at 6500rpm, was obtained.

  8. Phase I (or phase II) dose-ranging clinical trials: proposal of a two-stage Bayesian design.

    Science.gov (United States)

    Zohar, Sarah; Chevret, Sylvie

    2003-02-01

    We propose a new design for phase I (or phase II) dose-ranging clinical trials aiming at determining a dose of an experimental treatment to satisfy safety (respectively efficacy) requirements, at treating a sufficiently large number of patients to estimate the toxicity (respectively failure) probability of the dose level with a given reliability, and at stopping the trial early if it is likely that no dose is safe (respectively efficacious). A two-stage design was derived from the Continual Reassessment Method (CRM), with implementation of Bayesian criteria to generate stopping rules. A simulation study was conducted to compare the operating characteristics of the proposed two-stage design to those reached by the traditional CRM. Finally, two applications to real data sets are provided.

  9. License Application Design Selection Report, REV 01. August 1999

    International Nuclear Information System (INIS)

    Hastings, C.R.

    1999-01-01

    In December 1998, the U.S. Department of Energy (DOE) published the ''Viability Assessment of a Repository at Yucca Mountain'' (DOE 1998b). The Viability Assessment described a preliminary design of a potential repository at Yucca Mountain, Nevada, for disposal of spent nuclear fuel and high-level radioactive waste, and assessed the probable behavior of that repository design in the Yucca Mountain geologic setting. The report concluded that 'Yucca Mountain remains a promising site for a geologic repository and that work should proceed to support a decision in 2001 on whether to recommend the site to the President for development as a repository'. It also concluded that 'uncertainties remain about key natural processes, the preliminary design, and how the site and design would interact'. Recognizing that the design that was evaluated will be refined before a license application could be submitted, the Viability Aassesment notes that 'DOE is evaluating several design options and alternatives that could reduce existing uncertainty and improve the performance of the repository system'. During the preparation of the Viability Assessment, DOE asked the contractor for the Civilian Radioactive Waste Management Program to study alternative design concepts for a potential geologic repository for high-level radioactive waste at Yucca Mountain. The License Application Design Selection (LADS) project was initiated to conduct that study. The goal of the project was to develop and evaluate a diverse range of conceptual repository designs that work well in concert with the Yucca Mountain site and to recommend an initial design concept for the possible Site Recommendation and License Apllication. This report presents the results of the LADS project. The design process consisted of two phases. In Phase I, a series of basic design concepts (design alternatives) and components (design features) were analyzed for their potential value as elements of a repository design. In Phase II

  10. TIBER II/ETR final design report: Volume 3, 5.0 Radiation safety and environment; 6.0 Physics and technology R and D needs

    International Nuclear Information System (INIS)

    Lee, J.D.

    1987-09-01

    This paper discusses the design of the TIBER II Tokamak. This particular volume discusses: safety and environmental requirements and design targets; accident analyses; personnel safety and maintenance exposure; effluent control; waste management and decommissioning; safety considerations in building design; and safety and environmental conclusions and recommendations

  11. Tokapole II device

    International Nuclear Information System (INIS)

    Sprott, J.G.

    1978-05-01

    A discussion is given of the design and operation of the Tokapole II device. The following topics are considered: physics considerations, vacuum vessel, poloidal field, ring and support design, toroidal field, vacuum system, initial results, and future plans

  12. Design and fabrication of two-dimensional semiconducting bolometer arrays for HAWC and SHARC-II

    Science.gov (United States)

    Voellmer, George M.; Allen, Christine A.; Amato, Michael J.; Babu, Sachidananda R.; Bartels, Arlin E.; Benford, Dominic J.; Derro, Rebecca J.; Dowell, C. D.; Harper, D. A.; Jhabvala, Murzy D.; Moseley, S. H.; Rennick, Timothy; Shirron, Peter J.; Smith, W. W.; Staguhn, Johannes G.

    2003-02-01

    The High resolution Airborne Wideband Camera (HAWC) and the Submillimeter High Angular Resolution Camera II (SHARC II) will use almost identical versions of an ion-implanted silicon bolometer array developed at the National Aeronautics and Space Administration's Goddard Space Flight Center (GSFC). The GSFC "Pop-Up" Detectors (PUD's) use a unique folding technique to enable a 12 × 32-element close-packed array of bolometers with a filling factor greater than 95 percent. A kinematic Kevlar suspension system isolates the 200 mK bolometers from the helium bath temperature, and GSFC - developed silicon bridge chips make electrical connection to the bolometers, while maintaining thermal isolation. The JFET preamps operate at 120 K. Providing good thermal heat sinking for these, and keeping their conduction and radiation from reaching the nearby bolometers, is one of the principal design challenges encountered. Another interesting challenge is the preparation of the silicon bolometers. They are manufactured in 32-element, planar rows using Micro Electro Mechanical Systems (MEMS) semiconductor etching techniques, and then cut and folded onto a ceramic bar. Optical alignment using specialized jigs ensures their uniformity and correct placement. The rows are then stacked to create the 12 × 32-element array. Engineering results from the first light run of SHARC II at the Caltech Submillimeter Observatory (CSO) are presented.

  13. Alcatel-Lucent Network Routing Specialist II (NRS II) Self-Study Guide Preparing for the NRS II Certification Exams

    CERN Document Server

    Warnock, Glenn

    2011-01-01

    The definitive resource for the NRS II exams—three complete courses in a book Alcatel-Lucent is a world leader in designing and developing scalable systems for service providers. If you are a network designer or operator who uses Alcatel-Lucent's 7750 family of service routers, prepare for certification as an A-L network routing specialist with this complete self-study course. You'll get thorough preparation for the NRS II exams while you learn to build state-of-the-art, scalable IP/MPLS-based service networks. The book provides you with an in-depth understanding of the protocols and tec

  14. AUTOMOTIVE DIESEL MAINTENANCE 1. UNIT XXIV, I--MAINTAINING THE FUEL SYSTEM PART III--CATERPILLAR DIESEL ENGINE, II--UNDERSTANDING THE VOLTAGE REGULATOR/ALTERNATOR.

    Science.gov (United States)

    Minnesota State Dept. of Education, St. Paul. Div. of Vocational and Technical Education.

    THIS MODULE OF A 30-MODULE COURSE IS DESIGNED TO DEVELOP AN UNDERSTANDING OF THE OPERATION AND MAINTENANCE OF THE DIESEL ENGINE FUEL AND BATTERY CHARGING SYSTEM. TOPICS ARE (1) INJECTION TIMING CONTROLS, (2) GOVERNOR, (3) FUEL SYSTEM MAINTENANCE TIPS, (4) THE CHARGING SYSTEM, (5) REGULATING THE GENERATOR/ALTERNATOR, AND (6) CHARGING SYSTEM SERVICE…

  15. Alternative practices in curriculum design. Participation as a key factor and speaking out as right

    Directory of Open Access Journals (Sweden)

    Susana Barco

    2012-06-01

    Full Text Available During the 1990s, in the context of neo-liberal policies, curricular changes ocurred in Latin América which gave a leading role to technicians and experts in education, in the process of writing the curricular documents. Beyond the critiques these policies can receive, it is necessary to find alternative ways of elaborating curricular documents, based on democratic idea of teacher's real participation.In an action-research within the scope of a university and two experiences referred to in this work, different participative styles emerged, according to their particular circumstances. This work referred to these processes and its theoretical foundations, reporting alternative ways of curricular design based on teacher's participation and its different forms. The aim is to enhance how teachers as a social subject can 'stand up for themselves'and 'speak out' in the specific practice of writing curricular documents. Taking into account that teaching practices rewrite curricular documents, different dynamics in curricular change are possible, allowing adjusting and adapting realities in each institution, and propelling collaborative work.

  16. Barnwell Nuclear Fuels Plant applicability study. Volume II. BNFP: utilization alternatives, evaluations, and conclusions

    International Nuclear Information System (INIS)

    1978-04-01

    Descriptions and status of the Barnwell separations facility and related fuel cycle facilities are given. Alternative uses other than reprocessing, evaluation of uses for reprocessing alternatives, resource utilization and its relationship to U.S. security objectives, and evaluation of ownership-management options are discussed

  17. Calculation of mixed mode stress intensity factors using an alternating method

    International Nuclear Information System (INIS)

    Sakai, Takayuki

    1999-01-01

    In this study, mixed mode stress intensity factors (K I and K II ) of a square plate with a notch were calculated using a finite element alternating method. The obtained results were compared with the ones by a finite element method, and it was shown that the finite element alternating method can accurately estimate mixed mode stress intensity factors. Then, using this finite element alternating method, mixed mode stress intensity factors were calculated as changing the size and position of the notch, and its simplified equations were proposed. (author)

  18. Alternative Schools. An Analysis of Their Impact on Administrators: Part II

    Science.gov (United States)

    Sachs, David; Codding, Judy

    1976-01-01

    Extensive interviews with school personnel of alternative programs reveal that it is in the process of defining their essence with regard to decision-making, admissions, policies, responsibility, freedom, calendars, and programs vs. school identity that planning problems arise. (A related document is EA 507 273.) (Author/MLF)

  19. Culham Conceptual Tokamak Mark II. Design study of the layout of a twin-reactor fusion power station

    International Nuclear Information System (INIS)

    Guthrie, J.A.S.; Harding, N.H.

    1981-07-01

    This report describes the building layout and outline design for the nuclear complex of a fusion reactor power station incorporating two Culham Conceptual Tokamak Reactors Mk.II. The design incorporates equipment for steam generation, process services for the fusion reactors and all facilities for routine and non-routine servicing of the nuclear complex. The design includes provision of temporary facilities for on site construction of the major reactor components and shows that these facilities may be used for disassembly of the reactors either for major repair and/or decommissioning. Preliminary estimates are included, which indicate the cost benefits to be obtained from incorporating two reactors in one nuclear complex and from increased wall loading. (author)

  20. Evaluation of the effectiveness and feasibility of the Waste Isolation Pilot Plant engineered alternatives: Final report of the Engineered Alternatives Task Force

    International Nuclear Information System (INIS)

    1991-07-01

    The Engineered Alternatives Task Force (EATF) was established by the United States Department of Energy (DOE) WIPP Project Office (WPO) in September 1989 (Hunt, A., 1990), to evaluate the relative effectiveness and feasibility of implementation of selected design enhancements (referred to as ''engineered alternatives'') for the Waste Isolation Pilot Plant (WIPP). These enhancements consist of modifications of existing waste forms and/or the WIPP facility, and other design variations such as passive marker systems. The purpose of this report is to summarize the methodologies and results of evaluation of the effectiveness of selected engineered alternatives relative to the existing repository design, and to discuss the feasibility of implementing these alternatives with respect to availability of technology, cost, schedule, and regulatory concerns. The EATF has concluded that a number of engineered alternatives could be implemented to improve repository performance if WIPP performance assessment determines that either gas generation or human intrusion presents a problem in demonstrating compliance. Within waste treatment, Level 3 treatments are the most effective in addressing multiple performance parameters, but tend to be the most expensive, the most difficult and time-consuming to implement, and have the greatest regulatory requirements. Level 2 treatments are less expensive, faster, require less extensive permitting, and utilize off- the-shelf technology, but are less effective in addressing multiple performance parameters. Depending upon the performance parameter, Level 1 alternatives such as alternative backfills, alternative waste containers, or modified repository design should be thoroughly evaluated and eliminated before any decision is made to treat the waste. The present uncertainty in the degree to which the baseline WIPP design complies with 40 CFR Part 191 and 40 CFR Part 268 precludes specific recommendations at this time. 130 refs., 21 figs., 37 tabs

  1. Distribution of magnetic field in type II superconductors

    International Nuclear Information System (INIS)

    Castro, J.L. de.

    1986-09-01

    The magnetie field penetration profile, in type II superconductor, has studied in specially designed cylindrical samples. The samples consist of alternated thick layers ( > 30 μm ) of niobium and copper deposited, by electron-beam evaporation or electro-chemical deposition, on cylindric core of either niobium or copper. The magnetization curves, the magnetic susceptibility and the differential susceptibility for small hysteresis loop ( H c1 c2 ) were measured for all the samples between 4. 2 and 9.5 K. These measurements, done with flux pinned and without, show some peculiar descontinuities and inflections which seems to resemble the samples shape. A simple phenonenological extension of Bean's critical state model was applied to these results, giving a resonable qualitative agreement. Also, a more elaborated theoretical model was improve which could give more quantitative fitting. (author) [pt

  2. Magnetic Field Considerations for the Design and Location of a Diagnostic Neutral Beam Injector for the TJ-II Stellarator

    International Nuclear Information System (INIS)

    McCarthy, K. J.; Lopez Fraguas, A.; Balbin, R.

    2004-01-01

    A diagnostic neutral beam injection system is being developed for the TJ-II stellarator. The principal goal is to increase the signal-to-noise ratio and to provide spatial resolution along the plasma minor radius in Charge Exchange Recombination Spectroscopy and Neutral Particle Analysis diagnostics, while also opening up new opportunities for physics studies. After summarizing the compact diagnostic neutral beam injector system selected as well as the TJ-II vacuum vessel and coil geometry, we address the sensitivity of TJ-II magnetic configurations to the ferromagnetic materials that shield the ion source and neutralizer tubing of the neutral beam injection system using a popular approach in which the field is approximated via magnetic dipole moments, finally, the scientific and design trade-offs made to minimize the impact are discussed. (Author) 24 refs

  3. KNK II, third core: Design Report of the breeder assemblies NR-230R, NR-231R, NR-233D and NR-234D

    International Nuclear Information System (INIS)

    Ricken, E.

    1988-07-01

    The report describes the blanket assemblies of the third core of KNK II and their operational behavior. The assemblies and their individual components are described and the design criteria, design methods and design results are presented. With the help of enveloping proofs the respectation of the design targets up to the foreseen residence time of 720 equivalent full-power days is evidenced [de

  4. An evaluation on the disposal alternatives for low- and intermediate- level radwaste (II)

    International Nuclear Information System (INIS)

    Park, Hun Hwee; Han, Kyung Won; Hahn, Pil Soo; Lee, Han Soo; Cho, Won Jin; Lee, Jae Dwan; Park, Chung Kyun; Lee, Myung Joo; Choi, Heui Joo; Lee, Youn Myoung

    1988-02-01

    An evaluation on the radioactive waste disposal alternatives for the low-and intermediate level wastes being produced from nuclear power generation and radioisotope application was carried out in view of the radiological safety, socio-political aspects and repository construction economics. Three types of possible alternatives-sample shallow land disposal method, engineered shallow land disposal method and engineered rock cavern disposal method are investigated. The safety assessment consists of radiological dose calculation and nonradiological impacts which is expressed as total number of injuries and fatalities during construction, operation and transportation. The sociopolitical assessment is done in terms of site conditions including easiness for land acquisition, technical feasibility and public acceptance. The economic assessment is performed by cost comparison regarding land acquisition, construction, operation and closure for each alternatives. The evaluation shows that engineered rock cavern disposal method has remarkable favour in safety than others. And also an integrated evaluation using AHP results the engineered rock cavern disposal method as the most favorable option

  5. State and Alternative Fuel Provider Fleets Alternative Compliance; U.S. Department of Energy (DOE), Energy Efficiency & Renewable Energy (EERE)

    Energy Technology Data Exchange (ETDEWEB)

    None

    2015-08-01

    The final rule of the Energy Policy Act of 2005 and its associated regulations enable covered state and alternative fuel provider fleets to obtain waivers from the alternative fuel vehicle (AFV)-acquisition requirements of Standard Compliance. Under Alternative Compliance, covered fleets instead meet a petroleum-use reduction requirement. This guidance document is designed to help fleets better understand the Alternative Compliance option and successfully complete the waiver application process.

  6. DARHT-II Downstream Transport Beamline

    International Nuclear Information System (INIS)

    Westenskow, G A; Bertolini, L R; Duffy, P T; Paul, A C

    2001-01-01

    This paper describes the mechanical design of the downstream beam transport line for the second axis of the Dual Axis Radiographic Hydrodynamic Test (DARHT II) Facility. The DARHT-II project is a collaboration between LANL, LBNL and LLNL. DARHT II is a 18.4-MeV, 2000-Amperes, 2-(micro)sec linear induction accelerator designed to generate short bursts of x-rays for the purpose of radiographing dense objects. The downstream beam transport line is approximately 22-meter long region extending from the end of the accelerator to the bremsstrahlung target. Within this proposed transport line there are 12 conventional solenoid, quadrupole and dipole magnets; as well as several specialty magnets, which transport and focus the beam to the target and to the beam dumps. There are two high power beam dumps, which are designed to absorb 80-kJ per pulse during accelerator start-up and operation. Aspects of the mechanical design of these elements are presented

  7. Modeling and optimization of operating parameters for a test-cell option of the Fusion Power Demonstration-II tandem mirror design

    International Nuclear Information System (INIS)

    Haney, S.W.; Fenstermacher, M.E.

    1985-01-01

    Models of tandem mirror devices operated with a test-cell insert have been used to calculate operating parameters for FPD-II+T, an upgrade of the Fusion Power Demonstration-II device. Two test-cell configurations were considered, one accommodating two 1.5 m blanket test modules and the other having four. To minimize the cost of the upgrade, FPD-II+T utilizes the same coil arrangement and machine dimensions outside of the test cell as FPD-II, and the requirements on the end cell systems have been held near or below those for FPD-II. The maximum achievable test cell wall loading found for the short test-cell was 3.5 MW/m 2 while 6.0 MW/m 2 was obtainable in the long test-cell configuration. The most severe limitation on the achievable wall loading is the upper limit on test-cell beta set by MHD stability calculations. Modification of the shape of the magnetic field in the test-cell by improving the magnet design could raise this beta limit and lead to improved test-cell performance

  8. Energy alternatives

    International Nuclear Information System (INIS)

    Sweet, C.

    1987-01-01

    The designated successor to fossil fuels is nuclear fission/fusion and that turns out to be problematic. Alternative Energy Systems have great potential but political forces seem to be hampering their development and introduction. The technologies are flexible in their use and scale of operation. The learning curve will not be short but neither will it be as long and as costly as nuclear power. It is time that this is recognised and some serious rethinking takes place in what presently passes for energy policies both in the industrialised countries and in the Third World. Alternative energy systems are defined and some of them which are relevant to the United Kingdom are discussed. (author)

  9. Ulex europaeus agglutinin II (UEA-II) is a novel, potent inhibitor of complement activation.

    Science.gov (United States)

    Lekowski, R; Collard, C D; Reenstra, W R; Stahl, G L

    2001-02-01

    Complement is an important mediator of vascular injury following oxidative stress. We recently demonstrated that complement activation following endothelial oxidative stress is mediated by mannose-binding lectin (MBL) and activation of the lectin complement pathway. Here, we investigated whether nine plant lectins which have a binding profile similar to that of MBL competitively inhibit MBL deposition and subsequent complement activation following human umbilical vein endothelial cell (HUVEC) oxidative stress. HUVEC oxidative stress (1% O(2), 24 hr) significantly increased Ulex europaeus agglutinin II (UEA-II) binding by 72 +/- 9% compared to normoxic cells. UEA-II inhibited MBL binding to HUVEC in a concentration-dependent manner following oxidative stress. Further, MBL inhibited UEA-II binding to HUVEC in a concentration-dependent manner following oxidative stress, suggesting a common ligand. UEA-II (< or = 100 micromol/L) did not attenuate the hemolytic activity, nor did it inhibit C3a des Arg formation from alternative or classical complement pathway-specific hemolytic assays. C3 deposition (measured by ELISA) following HUVEC oxidative stress was inhibited by UEA-II in a concentration-dependent manner (IC(50) = 10 pmol/L). UEA-II inhibited C3 and MBL co-localization (confocal microscopy) in a concentration-dependent manner on HUVEC following oxidative stress (IC(50) approximately 1 pmol/L). Finally, UEA-II significantly inhibited complement-dependent neutrophil chemotaxis, but failed to inhibit fMLP-mediated chemotaxis, following endothelial oxidative stress. These data demonstrate that UEA-II is a novel, potent inhibitor of human MBL deposition and complement activation following human endothelial oxidative stress.

  10. Greenhouse gas emissions of alternative pavement designs: framework development and illustrative application.

    Science.gov (United States)

    Liu, Xiaoyu; Cui, Qingbin; Schwartz, Charles

    2014-01-01

    Pavement rehabilitation is carbon intensive and the choice of pavement type is a critical factor in controlling greenhouse gas (GHG) emissions. The existing body of knowledge is not able to support decision-making on pavement choice due to a lack of consensus on the system boundaries, the functional units and the estimation periods. Excessive data requirements further inhibit the generalization of the existing methodologies for design evaluation at the early planning stage. This study proposes a practical life-cycle GHG estimation approach, which is arguably effective to benchmark pavement emissions given project bid tabulation. A set of case studies conducted for this study suggest that recycled asphalt pavement (e.g., foam stabilized base (FSB), and warm mix asphalt (WMA)) would prevent up to 50% of GHGs from the initial construction phase. However, from a life-cycle perspective, pavement emissions are dictated largely by the traffic characteristics and the analysis period for the use phase. The benefits from using recycled materials (e.g., FSB) are likely to diminish if the recycled products do not perform as well as those properly proportioned with less recycled materials, or if the recycled materials are locally unavailable. When the AADT reaches 10,000, use phase releases more than 97% of the life cycle emissions and the emissions difference among alternative designs will be within 1%. Copyright © 2013 Elsevier Ltd. All rights reserved.

  11. Complementary and Alternative Medicine

    Science.gov (United States)

    ... therapies are often lacking; therefore, the safety and effectiveness of many CAM therapies are uncertain. The National Center for Complementary and Alternative Medicine (NCCAM) is sponsoring research designed to fill this ...

  12. Current status for TRR-II Cold Neutron Source

    International Nuclear Information System (INIS)

    Lee, C.H.; Guung, T.C.; Lan, K.C.; Wang, C.H.; Chan, Y.K.; Shieh, D.J.

    2001-01-01

    The Taiwan Research Reactor (TRR) project (TRR-II) is carrying out at Institute of Nuclear Energy Research (INER) from October 1998 to December 2006. The purpose of Cold Neutron Source (CNS) project is to build entire CNS facility to generate cold neutrons within TRR-II reactor. The objective of CNS design is to install CNS facility with a competitive brightness of cold neutron beam to other facilities in the world. Based on the TRR-II CNS project schedule, the conceptual design for TRR-II CNS facility has been completed and the mock-up test facility for full-scale hydrogen loop has been designed. (author)

  13. Cost-benefit analysis of alternative fuels and motive designs.

    Science.gov (United States)

    2013-04-01

    This project was funded by the Federal Railroad Administration to better understand the potential cost and benefits of using alternative fuels for U.S. freight and passenger locomotive operations. The framework for a decision model was developed by T...

  14. Removal of Ni(II), Zn(II) and Pb(II) ions from single metal aqueous solution using rice husk-based activated carbon

    Energy Technology Data Exchange (ETDEWEB)

    Taha, Mohd F., E-mail: faisalt@petronas.com.my; Shaharun, Maizatul S. [Fundamental and Applied Sciences Department, Universiti Teknologi PETRONAS, Bandar Seri Iskandar, 31750, Perak Darul Ridzuan (Malaysia); Shuib, Anis Suhaila, E-mail: anisuha@petronas.com.my; Borhan, Azry [Chemical Engineering Department, Universiti Teknologi PETRONAS, Bandar Seri Iskandar, 31750, Perak Darul Ridzuan (Malaysia)

    2014-10-24

    An attempt was made to investigate the potential of rice husk-based activated carbon as an alternative low-cost adsorbent for the removal of Ni(II), Zn(II) and Pb(II) ions from single aqueous solution. Rice husk-based activated carbon was prepared via treatment of rice husk with NaOH followed by the carbonization process at 400°C for 2 hours. Three samples, i.e. raw rice husk, rice husk treated with NaOH and rice husk-based activated carbon, were analyzed for their morphological characteristics using field-emission scanning electron microscope/energy dispersive X-ray (FESEM/EDX). These samples were also analyzed for their carbon, hydrogen, nitrogen, oxygen and silica contents using CHN elemental analyzer and FESEM/EDX. The porous properties of rice husk-based activated carbon were determined by Brunauer-Emmett-Teller (BET) surface area analyzer, and its surface area and pore volume were 255 m{sup 2}/g and 0.17 cm{sup 2}/g, respectively. The adsorption studies for the removal of Ni(II), Zn(II) and Pb(II) ions from single metal aqueous solution were carried out at a fixed initial concentration of metal ion (150 ppm) with variation amount of adsorbent (rice husk-based activated carbon) as a function of varied contact time at room temperature. The concentration of each metal ion was analyzed using atomic absorption spectrophotometer (AAS). The results obtained from adsorption studies indicate the potential of rice husk as an economically promising precursor for the preparation of activated carbon for removal of Ni(II), Zn(II) and Pb(II) ions from single aqueous solution. Isotherm and kinetic model analyses suggested that the experimental data of adsorption studies fitted well with Langmuir, Freundlich and second-order kinetic models.

  15. Preliminary design study of an alternate heat source assembly for a Brayton isotope power system

    Science.gov (United States)

    Strumpf, H. J.

    1978-01-01

    Results are presented for a study of the preliminary design of an alternate heat source assembly (HSA) intended for use in the Brayton isotope power system (BIPS). The BIPS converts thermal energy emitted by a radioactive heat source into electrical energy by means of a closed Brayton cycle. A heat source heat exchanger configuration was selected and optimized. The design consists of a 10 turn helically wound Hastelloy X tube. Thermal analyses were performed for various operating conditions to ensure that post impact containment shell (PICS) temperatures remain within specified limits. These limits are essentially satisfied for all modes of operation except for the emergency cooling system for which the PICS temperatures are too high. Neon was found to be the best choice for a fill gas for auxiliary cooling system operation. Low cycle fatigue life, natural frequency, and dynamic loading requirements can be met with minor modifications to the existing HSA.

  16. Multiobjective optimization design of green building envelope material using a non-dominated sorting genetic algorithm

    International Nuclear Information System (INIS)

    Yang, Ming-Der; Lin, Min-Der; Lin, Yu-Hao; Tsai, Kang-Ting

    2017-01-01

    Highlights: • An effective envelope energy performance model (BEM) was developed. • We integrated NSGA-II with the BEM to optimize the green building envelope. • A tradeoff plan of green building design for three conflict objectives was obtained. • The optimal envelope design efficiently reduced the construction cost of green building. - Abstract: To realize the goal of environmental sustainability, improving energy efficiency in buildings is a major priority worldwide. However, the practical design of green building envelopes for energy conservation is a highly complex optimization problem, and architects must make multiobjective decisions. In practice, methods such as multicriteria analyses that entail capitalizing on possibly many (but in nearly any case limited) alternatives are commonly employed. This study investigated the feasibility of applying a multiobjective optimal model on building envelope design (MOPBEM), which involved integrating a building envelope energy performance model with a multiobjective optimizer. The MOPBEM was established to provide a reference for green designs. A nondominated sorting genetic algorithm-II (NSGA-II) was used to achieve a tradeoff design set between three conflicting objectives, namely minimizing the envelope construction cost (ENVCOST), minimizing the envelope energy performance (ENVLOAD), and maximizing the window opening rate (WOPR). A real office building case was designed using the MOPBEM to identify the potential strengths and weaknesses of the proposed MOPBEM. The results showed that a high ENVCOST was expended in simultaneously satisfying the low ENVLOAD and high WOPR. Various designs exhibited obvious cost reductions compared with the original architects' manual design, demonstrating the practicability of the MOPBEM.

  17. Alternative Energy Systems

    Energy Technology Data Exchange (ETDEWEB)

    West, M.; Duckers, L.; Lockett, P.; Loughridge, B.; Peatfield, T.; White, P.

    1984-01-01

    The Coventry (Lanchester) Polytechnic Wave Energy Group has been involved in the United Kingdom wave energy research programme since its inception in 1975. Whilst the work of the group is mainly concerned with wave energy, and currently is directed towards the design of a wave energy device tailored to the needs of isolated/island communities, it has some involvement with other aspects of the alternatives. This conference, dealing with alternative energy systems and their electrical integration and utilisation was engendered by the general interest which the Polytechnic group members have in the alternatives and their use. The scope for electrical integration and utilisation is very broad. Energy for family groups may be provided in a relatively unsophisticated way which is acceptable to them. Small population centres, for example island communities relying upon diesel equipment, can reap the benefits of the alternatives through their ability to accept novel integration schemes and a flexible approach to the use of the energy available. Consumers already enjoying the benefits of a 'firm' electricity grid supply can use energy from a variety of alternative systems, via the grid, without having to modify their energy consumption habits. In addition to the domestic and industrial applications and coastal possibilities, specialist applications in isolated environments have also emerged. The Proceedings detail practical, technical and economic aspects of the alternatives and their electrical integration and utilisation.

  18. Design and analysis of a wiggler magnet system for the PEP-II B-Factory LER

    International Nuclear Information System (INIS)

    Heim, J.; Kendall, M.; Bertolini, L.; Fackler, O.; O'Connor, T.; Swan, T.; Zholents, A.

    1996-01-01

    The Low Energy Ring (LER) of the PEP-II B-Factory will use a wiggler magnet system for emittance control and additional damping. The wiggler magnet system is a set of 11 individual iron core, water cooled, dipole magnets designed to operate at 1.6 T and generate 400 kW of synchrotron radiation. Space has been provided to add a second wiggler with an additional 400 kW of synchrotron radiation if more damping is needed in the future. A copper vacuum chamber is used with continuous antechambers connected to both sides of the beam chamber via slots. Synchrotron radiation dump surfaces and distributed vacuum pumping are located in both antechambers. The authors describe the design and analysis of the wiggler magnets and the salient features of the vacuum chamber and dumps

  19. Adaptive designs for dose-finding in non-cancer phase II trials: influence of early unexpected outcomes.

    Science.gov (United States)

    Resche-Rigon, Matthieu; Zohar, Sarah; Chevret, Sylvie

    2008-01-01

    In non-cancer phase II trials, dose-finding trials are usually carried out using fixed designs, in which several doses including a placebo are randomly distributed to patients. However, in certain vulnerable populations, such as neonates or infants, there is an heightened requirement for safety, precluding randomization. To estimate the minimum effective dose of a new drug from a non-cancer phase II trial, we propose the use of adaptive designs like the Continual Reassessment Method (CRM). This approach estimates the dose closest to some target response, and has been shown to be unbiased and efficient in cancer phase I trials. Based on a motivating example, we point out the individual influence of first outliers in this setting. A weighted version of the CRM is proposed as a theoretical benchmark to control for these outliers. Using simulations, we illustrate how this approach provides further insight into the behavior of the CRM. When dealing with low targets like a 10% failure rate, the CRM appears unable to rapidly overcome an early unexpected outcome. This behavior persisted despite changing the inference (Bayesian or likelihood), underlying dose-response model (though slightly improved using the power model), and the number of patients enrolled at each dose level. The choices for initial guesses of failure rates, the vague prior for the model parameter, and the log-log shape of weights can appear somewhat arbitrary. In phase II dose-finding studies in which failure targets are below 20%, the CRM appears quite sensitive to first unexpected outcomes. Using a power model for dose-response improves some behavior if the trial is started at the first dose level and includes at least three to five patients at the starting dose before applying the CRM allocation rule.

  20. British Columbia : an alternative design

    International Nuclear Information System (INIS)

    Ostergaard, P.

    2003-01-01

    This PowerPoint presentation outlined the British Columbia Ministry of Energy and Mines' approach to the electricity market. A brief overview of the electric system in the province was provided, examining capacity (primarily hydro based) and the utility sector with its public ownership. In British Columbia, 80 per cent of the electricity is generated by British Columbia Hydro (BC Hydro). The rates are based on cost of service. British Columbia's market is western North America. A comparison of monthly bills for several large cities, both Canadian and American, was displayed. The market reviews conducted in 1995, 1998, and 2002 were reviewed and the major recommendations discussed. The author identified the opportunities in the province, discussing natural gas and coal for electricity production, resource potential, demand, and private sector capacity. The challenges facing the province are: cost effective development of resources to meet energy demand; aging infrastructure, high reliability requirements and economic growth; evolving electricity market structure in the United States; and, monopoly. The transmission system was reviewed with reference to trade with the Pacific Northwest, flexibility and storage. The energy plan objectives for the future were presented, including low rates and public ownership, secure and reliable supply, more private sector opportunities, and environmental responsibility. The alternative market structure includes regulated market characteristics, access to trade, and customer focus. figs

  1. E-st@r-I experience: Valuable knowledge for improving the e-st@r-II design

    Science.gov (United States)

    Corpino, S.; Obiols-Rabasa, G.; Mozzillo, R.; Nichele, F.

    2016-04-01

    Many universities all over the world have now established hands-on education programs based on CubeSats. These small and cheap platforms are becoming more and more attractive also for other-than-educational missions, such as technology demonstration, science applications, and Earth observation. This new paradigm requires the development of adequate technology to increase CubeSat performance and mission reliability, because educationally-driven missions have often failed. In 2013 the ESA Education Office launched the Fly Your Satellite! Programme which aims at increasing CubeSat mission reliability through several actions: to improve design implementation, to define best practices for conducting the verification process, and to make the CubeSat community aware of the importance of verification. Within this framework, the CubeSat team at Politecnico di Torino developed the e-st@r-II CubeSat as follow-on of the e-st@r-I satellite, launched in 2012 on the VEGA Maiden Flight. E-st@r-I and e-st@r-II are both 1U satellites with educational and technology demonstration objectives: to give hands-on experience to university students and to test an active attitude determination and control system based on inertial and magnetic measurements with magnetic actuation. This paper describes the know-how gained thanks to the e-st@r-I mission, and how this heritage has been translated into the improvement of the new CubeSat in several areas and lifecycle phases. The CubeSat design has been reviewed to reduce the complexity of the assembly procedure and to deal with possible failures of the on-board computer, for example re-coding the software in the communications subsystem. New procedures have been designed and assessed for the verification campaign accordingly to ECSS rules and with the support of ESA specialists. Different operative modes have been implemented to handle some anomalies observed during the operations of the first satellite. A new version of the on-board software is

  2. Magnetite Dissolution Performance of HYBRID-II Decontamination Process

    International Nuclear Information System (INIS)

    Kim, Seonbyeong; Lee, Woosung; Won, Huijun; Moon, Jeikwon; Choi, Wangkyu

    2014-01-01

    In this study, we conducted the magnetite dissolution performance test of HYBRID-II (Hydrazine Based Reductive metal Ion Decontamination with sulfuric acid) as a part of decontamination process development. Decontamination performance of HYBRID process was successfully tested with the results of the acceptable decontamination factor (DF) in the previous study. While following-up studies such as the decomposition of the post-decontamination HYBRID solution and corrosion compatibility on the substrate metals of the target reactor coolant system have been continued, we also seek for an alternate version of HYBRID process suitable especially for decommissioning. Inspired by the relationship between the radius of reacting ion and the reactivity, we replaced the nitrate ion in HYBRID with bigger sulfate ion to accommodate the dissolution reaction and named HYBRID-II process. As a preliminary step for the decontamination performance, we tested the magnetite dissolution performance of developing HYBRID-II process and compared the results with those of HYBRID process. HYBRID process developed previously is known have the acceptable decontamination performance, but the relatively larger volume of secondary waste induced by anion exchange resin to treat nitrate ion is the one of the problems related in the development of HYBRID process to be applicable. Therefore we alternatively devised HYBRID-II process using sulfuric acid and tested its dissolution of magnetite in numerous conditions. From the results shown in this study, we can conclude that HYBRID-II process improves the decontamination performance and potentially reduces the volume of secondary waste. Rigorous tests with metal oxide coupons obtained from reactor coolant system will be followed to prove the robustness of HYBRID-II process in the future

  3. Compression and radiation of high-power short rf pulses. II. A novel antenna array design with combined compressor/radiator elements

    KAUST Repository

    Sirenko, Kostyantyn; Pazynin, Vadim L.; Sirenko, Yu K.; Bagci, Hakan

    2011-01-01

    The paper discusses the radiation of compressed high power short RF pulses using two different types of antennas: (i) A simple monopole antenna and (ii) a novel array design, where each of the elements is constructed by combining a compressor and a

  4. Phase I and II feasibility study report for the 300-FF-5 operable unit

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-12-31

    The purpose of this Phase I/II feasibility study is to assemble and screen a list of alternatives for remediation of the 300-FF-5 operable site on the Hanford Reservation. This screening is based on information gathered in the Phase I Remedial Investigation (RI) and on currently available information on remediation technologies. The alternatives remaining after screening provide a range of response actions for remediation. In addition, key data needs are identified for collection during a Phase II RI (if necessary). This Phase I/II FS represents a primary document as defined by the Tri-Party Agreement, but will be followed by a Phase III FS that will further develop the alternatives and provide a detailed evaluation of them. The following remedial action objectives were identified for the 300-FF-5 operable unit: Limit current human exposure to contaminated groundwater in the unit; Limit discharge of contaminated groundwater to the Columbia River; Reduce contaminant concentrations in groundwater below acceptable levels by the year 2018.

  5. Phase I and II feasibility study report for the 300-FF-5 operable unit

    International Nuclear Information System (INIS)

    1993-01-01

    The purpose of this Phase I/II feasibility study is to assemble and screen a list of alternatives for remediation of the 300-FF-5 operable site on the Hanford Reservation. This screening is based on information gathered in the Phase I Remedial Investigation (RI) and on currently available information on remediation technologies. The alternatives remaining after screening provide a range of response actions for remediation. In addition, key data needs are identified for collection during a Phase II RI (if necessary). This Phase I/II FS represents a primary document as defined by the Tri-Party Agreement, but will be followed by a Phase III FS that will further develop the alternatives and provide a detailed evaluation of them. The following remedial action objectives were identified for the 300-FF-5 operable unit: Limit current human exposure to contaminated groundwater in the unit; Limit discharge of contaminated groundwater to the Columbia River; Reduce contaminant concentrations in groundwater below acceptable levels by the year 2018

  6. Hybrid porous phosphate heterostructures as adsorbents of Hg(II) and Ni(II) from industrial sewage

    International Nuclear Information System (INIS)

    Jimenez-Jimenez, J.; Algarra, M.; Rodriguez-Castellon, E.; Jimenez-Lopez, A.; Esteves da Silva, J.C.G.

    2011-01-01

    Porous phosphate heterostructures (PPH), functionalized with different ratios of aminopropyl and mercaptopropyl groups, labelled as N x=5,25,50 -PPH and S x=5,25,50 -PPH, respectively, were tested as adsorbents for Ni(II) and Hg(II) found in industrial sewage from electroplating processes and button battery recycling. X-ray diffraction was used to study the structures. The specific surface area of the pristine material (PPH) was 620 m 2 g -1 , whereas the specific surface areas of the modified mercaptopropyl (S 5 -PPH) and aminopropyl (N 5 -PPH) were 472 and 223 m 2 g -1 , respectively. The adsorption data were fitted to a Langmuir isotherm model. The S 5 -PPH material was saturated by 120 mmol Hg(II) per 100 g of material, whereas for Ni(II) adsorption, N 25 -PPH material displayed the highest adsorption with a saturation value of 43.5 mmol per 100 g. These results suggest that functionalized PPH materials may be promising toxic metal scavengers and that they may provide an alternative environmental technology.

  7. Hybrid porous phosphate heterostructures as adsorbents of Hg(II) and Ni(II) from industrial sewage

    Energy Technology Data Exchange (ETDEWEB)

    Jimenez-Jimenez, J., E-mail: jjimenez@uma.es [Departamento de Quimica Inorganica, Facultad de Ciencias, Universidad de Malaga, Campus de Teatinos s/n, 29071 Malaga (Spain); Algarra, M. [Centro de Geologia do Porto, Faculdade de Ciencias, Universidade do Porto. Rua do, Campo Alegre 687, 4169-007 Porto (Portugal); Rodriguez-Castellon, E.; Jimenez-Lopez, A. [Departamento de Quimica Inorganica, Facultad de Ciencias, Universidad de Malaga, Campus de Teatinos s/n, 29071 Malaga (Spain); Esteves da Silva, J.C.G. [Centro de Investigacao em Quimica (CIQ-UP), Faculdade de, Ciencias da Universidade do Porto, Rua do Campo Alegre 687, 4169-007 Porto (Portugal)

    2011-06-15

    Porous phosphate heterostructures (PPH), functionalized with different ratios of aminopropyl and mercaptopropyl groups, labelled as N{sub x=5,25,50}-PPH and S{sub x=5,25,50}-PPH, respectively, were tested as adsorbents for Ni(II) and Hg(II) found in industrial sewage from electroplating processes and button battery recycling. X-ray diffraction was used to study the structures. The specific surface area of the pristine material (PPH) was 620 m{sup 2} g{sup -1}, whereas the specific surface areas of the modified mercaptopropyl (S{sub 5}-PPH) and aminopropyl (N{sub 5}-PPH) were 472 and 223 m{sup 2} g{sup -1}, respectively. The adsorption data were fitted to a Langmuir isotherm model. The S{sub 5}-PPH material was saturated by 120 mmol Hg(II) per 100 g of material, whereas for Ni(II) adsorption, N{sub 25}-PPH material displayed the highest adsorption with a saturation value of 43.5 mmol per 100 g. These results suggest that functionalized PPH materials may be promising toxic metal scavengers and that they may provide an alternative environmental technology.

  8. Automatic Generation of User Interface Layouts for Alternative Screen Orientations

    OpenAIRE

    Zeidler , Clemens; Weber , Gerald; Stuerzlinger , Wolfgang; Lutteroth , Christof

    2017-01-01

    Part 1: Adaptive Design and Mobile Applications; International audience; Creating multiple layout alternatives for graphical user interfaces to accommodate different screen orientations for mobile devices is labor intensive. Here, we investigate how such layout alternatives can be generated automatically from an initial layout. Providing good layout alternatives can inspire developers in their design work and support them to create adaptive layouts. We performed an analysis of layout alternat...

  9. Retrievable storage concept designs. Final report

    International Nuclear Information System (INIS)

    Nickell, R.E.

    1979-01-01

    Three tasks related to the reference design of retrievable storage canisters for radioactive waste have been completed. The three tasks consist of the reference design itself, the definition of failure modes most appropriate for structural integrity determinations for the reference canister, and the development of a failure methodology for the structural integrity of the containers. The reference design is a sealed storage canister concept based upon the waste isolation pilot plant (WIPP) design, with slight modifications. The modifications consist of an alternate lifting yoke arrangement for the top head and a revised bottom head design for absorption of impact energy. Welded closures provide the seal at each end. Overpacking is considered as a possibility, but is not included in the preliminary reference design. The four failure modes that are deemed the most appropriate for the design of the reference canister are: (i) a loss of functional capability; (ii) ductile rupture of the canister; (iii) buckling of the structural members; and (iv) stress corrosion cracking. Failure scenarios are provided for each of the relevant failure modes. In addition, a failure methodology based upon the distribution of demand and the distribution of capacity for the structural members, with respect to each failure mode, is proffered

  10. Standard and alternative landfill capping design in Germany

    International Nuclear Information System (INIS)

    Simon, Franz-Georg; Mueller, Werner W.

    2004-01-01

    Engineered capping systems are in most cases an indispensable and often the only efficient component required by the long-term safety concept for landfills, mine tailings tips and contaminated land. In Germany the composite liner is the main component of standard landfill cappings for municipal and hazardous waste landfills and the compacted clay liner (CCL) for landfills for inert or low-contamination waste. The composite liner is a technically highly effective but very expensive system. Research and experience has given rise to concern about the proper long-term performance of a conventional single CCL as a landfill capping. Therefore, alternative capping systems are discussed and applied for landfills and for the containment of contaminated sites. This paper gives an overview on various alternative engineered cappings and suitable systems for capping reflecting the state of the art and the expert view in Germany. According to the European Council Directive on the landfill of waste an impermeable mineral layer is recommended for the surface sealing of non-hazardous landfills and a composition of artificial sealing liner and impermeable mineral layer for hazardous landfills. In both cases a drainage layer thickness of at least 0.5 m is suggested. These recommendations should be interpreted flexibly and to some extent modified in the light of the experience and results presented in this paper

  11. EBR-II: twenty years of operating experience

    International Nuclear Information System (INIS)

    Lentz, G.L.; Buschman, H.W.; Smith, R.N.

    1985-01-01

    Experimental Breeder Reactor No. 2 (EBR-II) is an unmoderated, sodium-cooled reactor with a design power of 62.5 MWt. For the last 20 years EBR-II has operated safely, has demonstrated stable operating characteristics, has shown excellent performance of its sodium components, and has had an excellent plant factor. These years of operating experience provide a valuable resource to the nuclear community for the development and design of future liquid metal fast reactors. This report provides a brief description of the EBR-II plant and its early operating experience, describes some recent problems of interest to the nuclear community, and also mentions some of the significant operating achievements of EBR-II. Finally, a few words and speculations on EBR-II's future are offered. 4 figs., 1 tab

  12. Synthesis, crystal structure and magnetic properties of an alternating manganese chain

    International Nuclear Information System (INIS)

    Ramos Silva, Manuela; Matos Beja, Ana; Antonio Paixao, Jose; Martin-Gil, Jesus

    2006-01-01

    A new 1D complex has been prepared and characterized. X-ray single crystal structure confirms that the Mn(II) ions assemble in alternating chains with Mn-Mn distances of 3.8432(13) and 4.4428(14) A. A 3D network of hydrogen bonds links the chains together. The temperature dependence of the magnetic susceptibility reveals that this compound undergoes a magnetic transition and exhibits an antiferromagnetic interaction in the low-temperature phase with two alternating exchange interactions of -2.32(1) and -5.55(1) cm -1 . - Graphical abstract: Portion of the dimeric manganese chain showing the two alternating exchange interactions paths

  13. Climate Change, Coastal Vulnerability and the Need for Adaptation Alternatives: Planning and Design Examples from Egypt and the USA

    Directory of Open Access Journals (Sweden)

    S Jeffress Williams

    2015-07-01

    Full Text Available Planning and design of coastal protection for high-risk events with low to moderate or uncertain probabilities are a challenging balance of short- and long-term cost vs. protection of lives and infrastructure. The pervasive, complex, and accelerating impacts of climate change on coastal areas, including sea-level rise, storm surge and tidal flooding, require full integration of the latest science into strategic plans and engineering designs. While the impacts of changes occurring are global, local effects are highly variable and often greatly exacerbated by geophysical (land subsidence, faulting, oceanographic (ocean circulation, wind patterns and anthropogenic factors. Reducing carbon emissions is needed to mitigate global warming, but adaptation can accommodate at least near future change impacts. Adaptation should include alternatives that best match region-specific risk, time frame, environmental conditions, and the desired protection. Optimal alternatives are ones that provide protection, accommodate or mimic natural coastal processes, and include landforms such as barrier islands and wetlands. Plans are often for 50 years, but longer-term planning is recommended since risk from climate change will persist for centuries. This paper presents an assessment of impacts of accelerating climate change on the adequacy of coastal protection strategies and explores design measures needed for an optimum degree of protection and risk reduction. Three coastal areas facing similar challenges are discussed: Abu-Qir Bay, Nile River delta plain, Egypt; Lake Borgne, New Orleans, Louisiana delta plain; and the New York City region.

  14. Current status of experimental breeder reactor-II [EBR-II] shutdown planning

    International Nuclear Information System (INIS)

    McDermott, M. D.; Griffin, C. D.; Michelbacher, J. A.; Earle, O. K.

    2000-01-01

    The Experimental Breeder Reactor--II (EBR-II) at Argonne National Laboratory--West (ANL-W) in Idaho, was shutdown in September, 1994 as mandated by the US Department of Energy. This sodium cooled reactor had been in service since 1964, and was to be placed in an industrially and radiologically safe condition for ultimate decommissioning. The deactivation of a liquid metal reactor presents unique concerns. The first major task associated with the project was the removal of all fueled assemblies. In addition, sodium must be drained from systems and processed for ultimate disposal. Residual quantities of sodium remaining in systems must be deactivated or inerted to preclude future hazards associated with pyrophoricity and generation of potentially explosive hydrogen gas. A Sodium Process Facility was designed and constructed to react the elemental sodium from the EBR-II primary and secondary systems to sodium hydroxide for disposal. This facility has a design capacity to allow the reaction of the complete inventory of sodium at ANL-W in less than two years. Additional quantities of sodium from the Fermi-1 reactor are also being treated at the Sodium Process Facility. The sodium environment and the EBR-II configuration, combined with the radiation and contamination associated with thirty years of reactor operation, posed problems specific to liquid metal reactor deactivation. The methods being developed and implemented at EBR-II can be applied to other similar situations in the US and abroad

  15. Design of a peptidic turn with high affinity for HgII

    DEFF Research Database (Denmark)

    Pires, Sara; Habjanic, Jelena; Sezer, Murat

    2012-01-01

    A four amino acid peptide containing the ß-turn template dPro-Pro in the middle and two cysteines (Cys) in the terminal positions (CdPPC) has been synthesized and its mercury(II) coordination properties studied using different spectroscopic methods. The UV-vis, CD, (199m)Hg PAC, and Raman...... spectroscopic studies indicate the binding of Hg(II) to the two Cys, forming the dithiolatemercury(II) complex Hg(CdPPC). Electrospray ionization mass spectrometry corroborates the 1:1 complex formation. A log K = 40.0 was determined for the formation constant of the Hg(CdPPC) complex using competition...... potentiometric studies. Replacement of the dPro-Pro motif by a Pro-Pro unit generated a peptide (CPPC) capable of forming a similar species [Hg(CPPC)] but showing a lower affinity for Hg(II) (at least 3-3.5 orders of magnitude lower). The introduction of the dPro-Pro motif is crucial to induce the folding...

  16. Elastase-2, a Tissue Alternative Pathway for Angiotensin II Generation, Plays a Role in Circulatory Sympathovagal Balance in Mice.

    Science.gov (United States)

    Becari, Christiane; Durand, Marina T; Guimaraes, Alessander O; Lataro, Renata M; Prado, Cibele M; de Oliveira, Mauro; Candido, Sarai C O; Pais, Paloma; Ribeiro, Mauricio S; Bader, Michael; Pesquero, Joao B; Salgado, Maria C O; Salgado, Helio C

    2017-01-01

    In vitro and ex vivo experiments indicate that elastase-2 (ELA-2), a chymotrypsin-serine protease elastase family member 2A, is an alternative pathway for angiotensin II (Ang II) generation. However, the role played by ELA-2 in vivo is unclear. We examined ELA-2 knockout (ELA-2KO) mice compared to wild-type (WT) mice and determined whether ELA-2 played a role in hemodynamics [arterial pressure (AP) and heart rate (HR)], cardiocirculatory sympathovagal balance and baroreflex sensitivity. The variability of systolic arterial pressure (SAP) and pulse interval (PI) for evaluating autonomic modulation was examined for time and frequency domains (spectral analysis), whereas a symbolic analysis was also used to evaluate PI variability. In addition, baroreflex sensitivity was examined using the sequence method. Cardiac function was evaluated echocardiographically under anesthesia. The AP was normal whereas the HR was reduced in ELA-2KO mice (425 ± 17 vs. 512 ± 13 bpm from WT). SAP variability and baroreflex sensitivity were similar in both strains. The LF power from the PI spectrum (33.6 ± 5 vs. 51.8 ± 4.8 nu from WT) and the LF/HF ratio (0.60 ± 0.1 vs. 1.45 ± 0.3 from WT) were reduced, whereas the HF power was increased (66.4 ± 5 vs. 48.2 ± 4.8 nu from WT) in ELA-2KO mice, indicating a shift toward parasympathetic modulation of HR. Echocardiographic examination showed normal fractional shortening and an ejection fraction in ELA-2KO mice; however, the cardiac output, stroke volume, and ventricular size were reduced. These findings provide the first evidence that ELA-2 acts on the sympathovagal balance of the heart, as expressed by the reduced sympathetic modulation of HR in ELA-2KO mice.

  17. Better prognostic marker in ICU - APACHE II, SOFA or SAP II!

    Science.gov (United States)

    Naqvi, Iftikhar Haider; Mahmood, Khalid; Ziaullaha, Syed; Kashif, Syed Mohammad; Sharif, Asim

    2016-01-01

    This study was designed to determine the comparative efficacy of different scoring system in assessing the prognosis of critically ill patients. This was a retrospective study conducted in medical intensive care unit (MICU) and high dependency unit (HDU) Medical Unit III, Civil Hospital, from April 2012 to August 2012. All patients over age 16 years old who have fulfilled the criteria for MICU admission were included. Predictive mortality of APACHE II, SAP II and SOFA were calculated. Calibration and discrimination were used for validity of each scoring model. A total of 96 patients with equal gender distribution were enrolled. The average APACHE II score in non-survivors (27.97+8.53) was higher than survivors (15.82+8.79) with statistically significant p value (discrimination power than SAP II and SOFA.

  18. Digital Hardware Design Teaching: An Alternative Approach

    Science.gov (United States)

    Benkrid, Khaled; Clayton, Thomas

    2012-01-01

    This article presents the design and implementation of a complete review of undergraduate digital hardware design teaching in the School of Engineering at the University of Edinburgh. Four guiding principles have been used in this exercise: learning-outcome driven teaching, deep learning, affordability, and flexibility. This has identified…

  19. Heysham II/Torness AGR core integrity

    International Nuclear Information System (INIS)

    Birch, A.L.; Hampson, J.D.

    1985-01-01

    The design and construction process for the Heysham II/Torness AGR core structures is presented. The design intent utilizing all past experience in designing and building AGR core structures is described. The major aspects of the design criteria and the design conditions are outlined to demonstrate how the integrity of the Heysham II/Torness core is assured. Since no recognized codes of practice for graphite core design exist, the National Nuclear Corporation (NNC) have conceived design criteria utilizing reserve factors based on their design experience. Target reserve factors are defined for particular loading conditions including the ultimate 'safe-shutdown earthquake'. The substantial programme of computer analysis and RandD work to substantiate the design, including seismic qualification, is described. In keeping with their responsibility for the detailed core structure design and the fuel path geometry (guide tube system), NNC attach great importance to design/manufacture/construction liaison, which is demonstrated in the quality assurance section. (author)

  20. Thermal and isothermal low cycle fatigue of MANET I and II

    International Nuclear Information System (INIS)

    Petersen, C.; Schmitt, R.; Garnier, D.

    1996-01-01

    Structural components of a DEMO-blanket are subjected during service to alternating thermal and mechanical stresses as a consequence of the pulsed reactor operation. Of particular concern is the fatigue endurance of martensitic steels like MANET under cyclic strains and stresses produced by these temperature changes. In order to design such structures, operating under combined mechanical and thermal cycling, fatigue life has to be calculated with reasonable accuracy. This paper proposes a description of thermal and isothermal mechanical low-cycle fatigue of MANET I and II steels using a single damage model, including plastic strain, temperature and strain rate as variables. This model presents notable advantages for the designer. As it corresponds to a single and continuous 'fatigue strength surface', it enables a reliable interpolation to be made throughout the studied domain of strains and temperatures, and allows for a reasonable extrapolation out of this domain, provided that no different metallurgical phenomena occur. (orig.)

  1. HYLIFE-II reactor chamber mechanical design

    International Nuclear Information System (INIS)

    House, P.A.

    1992-01-01

    Mechanical design features of the reactor chamber for the HYLIFE-11 inertial confinement fusion power plant are presented. A combination of oscillating and steady, molten salt streams are used for shielding and blast protection. The system is designed for an 8 Hz repetition rate. Beam path clearing, between shots, is accomplished with the oscillating flow. The mechanism for generating the oscillating streams is described. A design configuration of the vessel wall allows adequate cooling and provides extra shielding to reduce thermal stresses to tolerable levels. The bottom portion of the reactor chamber is designed to minimize splash back of the high velocity (20 m/s) salt streams and also recover up to half of the dynamic head

  2. Tapping the potential of alternative medicine.

    Science.gov (United States)

    La Puma, J; Eiler, G

    1998-04-01

    Interest in alternative medicine is growing among healthcare consumers. Health plans and healthcare organizations may be able to improve clinical outcomes and benefit financially by providing patients with access to alternative services. Organizations that can assess their communities' particular needs, draw on interested professional staff to help develop alternative medicine programs and protocols, and study quality outcomes will stand a better chance of making such programs successful. Educating medical staff, designing a credible program, and forging strategic alliances with respected partners can help organizations create a sharply focused brand identity in the community.

  3. Alternative Energy Sources

    CERN Document Server

    Michaelides, Efstathios E (Stathis)

    2012-01-01

    Alternative Energy Sources is designed to give the reader, a clear view of the role each form of alternative energy may play in supplying the energy needs of the human society in the near and intermediate future (20-50 years).   The two first chapters on energy demand and supply and environmental effects, set the tone as to why the widespread use of alternative energy is essential for the future of human society. The third chapter exposes the reader to the laws of energy conversion processes, as well as the limitations of converting one energy form to another. The sections on exergy give a succinct, quantitative background on the capability/potential of each energy source to produce power on a global scale. The fourth, fifth and sixth chapters are expositions of fission and fusion nuclear energy. The following five chapters (seventh to eleventh) include detailed descriptions of the most common renewable energy sources – wind, solar, geothermal, biomass, hydroelectric – and some of the less common sources...

  4. Crossing Active Faults on the Sakhalin II Onshore Pipeline Route: Pipeline Design and Risk Analysis

    International Nuclear Information System (INIS)

    Mattiozzi, Pierpaolo; Strom, Alexander

    2008-01-01

    Twin oil (20 and 24 inch) and gas (20 and 48 inch) pipeline systems stretching 800 km are being constructed to connect offshore hydrocarbon deposits from the Sakhalin II concession in the North to an LNG plant and oil export terminal in the South of Sakhalin island. The onshore pipeline route follows a regional fault zone and crosses individual active faults at 19 locations. Sakhalin Energy, Design and Construction companies took significant care to ensure the integrity of the pipelines, should large seismic induced ground movements occur during the Operational life of the facilities. Complex investigations including the identification of the active faults, their precise location, their particular displacement values and assessment of the fault kinematics were carried out to provide input data for unique design solutions. Lateral and reverse offset displacements of 5.5 and 4.5 m respectively were determined as the single-event values for the design level earthquake (DLE) - the 1000-year return period event. Within the constraints of a pipeline route largely fixed, the underground pipeline fault crossing design was developed to define the optimum routing which would minimize stresses and strain using linepipe materials which had been ordered prior to the completion of detailed design, and to specify requirements for pipe trenching shape, materials, drainage system, etc. Detailed Design was performed with due regard to actual topography and to avoid the possibility of the trenches freezing in winter, the implementation of specific drainage solutions and thermal protection measures

  5. Alternative Energy Center, Final Scientific/Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Dillman, Howard D.; Marshall, JaNice C.

    2007-09-07

    The Lansing Community College Alternative Energy Center was created with several purposes in mind. The first purpose was the development of educational curricula designed to meet the growing needs of advanced energy companies that would allow students to articulate to other educational institutions or enter this growing workforce. A second purpose was the professional development of faculty and teachers to prepare them to train tomorrow's workforce and scholars. Still another purpose was to design, construct, and equip an alternative energy laboratory that could be used for education, demonstration, and public outreach. Last, the Center was to engage in community outreach and education to enhance industry partnerships, inform decision makers, and increase awareness and general knowledge of hydrogen and other alternative energy technologies and their beneficial impacts on society. This project has enabled us to accomplish all of our goals, including greater faculty understanding of advanced energy concepts, who are now able to convey this knowledge to students through a comprehensive alternative energy curriculum, in a facility well-equipped with advanced technologies, which is also being used to better educate the public on the advantages to society of exploring alternative energy technologies.

  6. Genetic and structural study of DNA-directed RNA polymerase II of Trypanosoma brucei, towards the designing of novel antiparasitic agents

    Directory of Open Access Journals (Sweden)

    Louis Papageorgiou

    2017-03-01

    Full Text Available Trypanosoma brucei brucei (TBB belongs to the unicellular parasitic protozoa organisms, specifically to the Trypanosoma genus of the Trypanosomatidae class. A variety of different vertebrate species can be infected by TBB, including humans and animals. Under particular conditions, the TBB can be hosted by wild and domestic animals; therefore, an important reservoir of infection always remains available to transmit through tsetse flies. Although the TBB parasite is one of the leading causes of death in the most underdeveloped countries, to date there is neither vaccination available nor any drug against TBB infection. The subunit RPB1 of the TBB DNA-directed RNA polymerase II (DdRpII constitutes an ideal target for the design of novel inhibitors, since it is instrumental role is vital for the parasite’s survival, proliferation, and transmission. A major goal of the described study is to provide insights for novel anti-TBB agents via a state-of-the-art drug discovery approach of the TBB DdRpII RPB1. In an attempt to understand the function and action mechanisms of this parasite enzyme related to its molecular structure, an in-depth evolutionary study has been conducted in parallel to the in silico molecular designing of the 3D enzyme model, based on state-of-the-art comparative modelling and molecular dynamics techniques. Based on the evolutionary studies results nine new invariant, first-time reported, highly conserved regions have been identified within the DdRpII family enzymes. Consequently, those patches have been examined both at the sequence and structural level and have been evaluated in regard to their pharmacological targeting appropriateness. Finally, the pharmacophore elucidation study enabled us to virtually in silico screen hundreds of compounds and evaluate their interaction capabilities with the enzyme. It was found that a series of chlorine-rich set of compounds were the optimal inhibitors for the TBB DdRpII RPB1 enzyme. All

  7. Simulation and design of distillation units for treatment of sulfite pulping condensates to recover methanol and furfural. Part II. Applicability of multiple-effect distillation using live steam

    Energy Technology Data Exchange (ETDEWEB)

    Aly, G.; Zacchi, G.

    1979-06-01

    A distillation unit has been designed for a capacity of 73 t/h of condensate and for at least 90% recovery of the contaminating organics. This unit consists of three columns: a primary stripper to remove volatile organics and two upgrading columns to purify the methanol and furfural byproducts. Three different energy-saving alternatives for satisfying the energy requirements have been studied: utilisation of secondary steam from the evaporation plant, and application of the principle of multi-effect distillation in one-stripper and in two-stripper configurations. Investment cost needed in all alternatives amounts to 5.5 to 6.0 MCr (millions of Swedish Crowns) while operating cost varies between 0.8 to 3.1 MCr. The first design alternative has a payoff period of 2.3 years while the two multi-effect distillation alternatives have a payoff period of about 3 years.

  8. Alternating Copolymers and Alternative Device Geometries for Organic Photovoltaics

    OpenAIRE

    Inganäs, Olle; Zhang, Fengling; Andersson, Mats R.

    2012-01-01

    The efficiency of conversion of light to electrical energy with the help of conjugated polymers and molecules is rapidly improving. The optical absorption properties of these materials can be designed, and implemented via molecular engineering. Full coverage of the solar spectrum is thus feasible. Narrow absorption spectra allow construction of tandem solar cells. The poor transport properties of these materials require thin devices, which limits optical absorption. Alternative device geometr...

  9. Cost reduction and safety design features of ABWR-II. Annex 5

    International Nuclear Information System (INIS)

    Koh, F.; Moriya, K.; Anegawa, T.

    2002-01-01

    The ABWR-II, which is aimed to be the next generation reactor following the latest BWR: Advanced Boiling Reactor (ABWR), is now under development jointly by the Japanese BWR utilities, General Electric Company, Hitachi Limited, and Toshiba Corporation. The key objectives of ABWR-II development include improvement in economics and further sophistication in safety for commercialization in the late 2010's and after. This paper summarizes the current status of ABWR-II development focusing on economics and safety. Plant power rating, fuel size, CRD rationalization and outage period are discussed from a cost reduction perspective. In terms of safety, the features such as diversification in emergency power sources and passive system application against severe accidents are being introduced. (author)

  10. PEP-II: An asymmetric B factory

    International Nuclear Information System (INIS)

    1993-06-01

    In this report, the authors have described an updated conceptual design for the high-luminosity Asymmetric B Factory (PEP-II) to be built in the PEP tunnel culmination of more than four years of effort aimed at the design and construction of an asymmetric e + e - collider capable of achieving a luminosity of L = 3 x 10 33 cm -2 s -1 . All aspects of the conceptual design were scrutinized in March 1991 by a DOE technical review committee chaired by Dr. L. Edward Temple. The design was deemed feasible and capable of achieving its physics goals. Furthermore, the cost estimate, schedule, and management plan for the project were fully endorsed by the committee. This updated conceptual design report captures the technical progress since the March 1991 review and reflects the lower cost estimate corresponding to the improved design. Although the PEP-II design has continued to evolve, no technical scope changes have been made that invalidate the conclusion of the DOE review. The configuration adopted utilizes two storage rings, an electron ring operating at 9 GeV and a positron ring at 3.1 GeV, each with a circumference of 2200 m. The high-energy ring is an upgrade of the PEP storage ring at SLAC; all PEP magnets and most power supplies will be reused. The upgrade consists primarily of replacing the PEP vacuum chamber and RF system with newly designed versions optimized for the high-current environment of PEP-II. The low-energy ring will be newly constructed and will be situated atop the high-energy ring in the PEP tunnel. Utilities already installed in the PEP tunnel are largely sufficient to operate the two PEP-II storage rings

  11. Alternative designs for petroleum product storage tanks for groundwater protection.

    Science.gov (United States)

    Oke Adeleke, Samson

    In developing countries, there are numerous occurrences of petroleum product spillage in groundwater. The current practice of burying storage tanks beneath the surface without adequate safety devices facilitates this phenomenon. Underground tanks rust and leak, and spilled petroleum products migrate downward. The movement of the oil in the soil depends on its viscosity and quantity, the permeability of the soil/rock, and the presence of fractures within the rock. The oil spreads laterally in the form of a thin pancake due to its lower specific gravity, and soluble components dissolve in water. The pollution plume of petroleum products and dissolved phases moves in the direction of groundwater flow in the aquifer within the pores of soil and sediments or along fractures in basement complex areas. Most communities reply heavily on groundwater for potable and industrial supplies. However, the sustainability of this resource is under threat in areas where there are filling stations as a result of significant groundwater contamination from petroleum product spillage. Drinking water becomes unpalatable when it contains petroleum products in low concentrations, and small quantities may contaminate large volumes of water. Considering the losses incurred from spillage, the cost of cleaning the aquifer, and the fact that total cleansing and attenuation is impossible, the need to prevent spillage and if it happens to prevent it from getting into the groundwater system is of paramount importance. This paper proposes alternative design procedures with a view to achieving these objectives.

  12. Leo II PC

    Data.gov (United States)

    Kansas Data Access and Support Center — LEO II is a second-generation software system developed for use on the PC, which is designed to convert location references accurately between legal descriptions and...

  13. Impact of Rate Design Alternatives on Residential Solar Customer Bills. Increased Fixed Charges, Minimum Bills and Demand-based Rates

    Energy Technology Data Exchange (ETDEWEB)

    Bird, Lori [National Renewable Energy Lab. (NREL), Golden, CO (United States); Davidson, Carolyn [National Renewable Energy Lab. (NREL), Golden, CO (United States); McLaren, Joyce [National Renewable Energy Lab. (NREL), Golden, CO (United States); Miller, John [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2015-09-01

    With rapid growth in energy efficiency and distributed generation, electric utilities are anticipating stagnant or decreasing electricity sales, particularly in the residential sector. Utilities are increasingly considering alternative rates structures that are designed to recover fixed costs from residential solar photovoltaic (PV) customers with low net electricity consumption. Proposed structures have included fixed charge increases, minimum bills, and increasingly, demand rates - for net metered customers and all customers. This study examines the electricity bill implications of various residential rate alternatives for multiple locations within the United States. For the locations analyzed, the results suggest that residential PV customers offset, on average, between 60% and 99% of their annual load. However, roughly 65% of a typical customer's electricity demand is non-coincidental with PV generation, so the typical PV customer is generally highly reliant on the grid for pooling services.

  14. Reirradiation with alternating docetaxel-based chemotherapy for recurrent head and neck squamous cell carcinoma. Update of a single-center prospective phase II protocol

    International Nuclear Information System (INIS)

    Berger, Bernhard; Weinmann, Martin; Bamberg, Michael; Belka, Claus; Budach, Wilfried; Hehr, Thomas

    2010-01-01

    Purpose: to report follow-up data and results of a dose escalation within a prospective phase II protocol scheduling alternating chemoreirradiation for patients with unresectable locoregional recurrence of head and neck cancer after previous curative-intent radiotherapy. Patients and methods: chemoreirradiation was initially performed in 27 patients by 40.0 Gy split-course reirradiation (re-RT) alternating with three cycles of docetaxel 50 mg/m 2 day 1 and cisplatin 15 mg/m 2 days 2-5 (first cohort). From 2002 onward, 30 consecutively treated patients received a late-course concomitant boost to 49.6 Gy (second cohort). In July 2008, the survival outcome was analyzed separately for both cohorts and the entire collective (n = 57). Results: the Kaplan-Meier estimates for 1- and 2-year overall survival (OS) were 52% and 24%, respectively (median OS 13.4 months). The median time of locoregional control was 9.6 months, and the actuarial 2-year freedom from distant metastasis rate was 55%. The re-RT dose escalation led to a significant improvement of the median OS (17.4 vs. 9.4 months; p = 0.039). Irrespective of the cohort, severe treatment-related toxicities occurred in about one third of patients. Conclusion: the treatment results confirm the efficacy and the safety of escalated re-RT doses in this chemoreirradiation protocol. (orig.)

  15. Fusion Engineering Device. Volume II. Design description

    International Nuclear Information System (INIS)

    1981-10-01

    This volume summarizes the design of the FED. It includes a description of the major systems and subsystems, the supporting plasma design analysis, a projected device cost and associated construction schedule, and a description of the facilities to house and support the device. This effort represents the culmination of the FY81 studies conducted at the Fusion Engineering Design Center (FEDC). Unique in these design activities has been the collaborative involvement of the Design Center personnel and numerous resource physicists from the fusion community who have made significant contributions in the physics design analysis as well as the physics support of the engineering design of the major FED systems and components

  16. Sequestration of chelated copper by structural Fe(II): Reductive decomplexation and transformation of Cu{sup II}-EDTA

    Energy Technology Data Exchange (ETDEWEB)

    He, Hongping [State Key Laboratory of Pollution Control and Resources Reuse, School of Environmental Science & Engineering, Tongji University, Shanghai 200092 (China); Wu, Deli, E-mail: wudeli@tongji.edu.cn [State Key Laboratory of Pollution Control and Resources Reuse, School of Environmental Science & Engineering, Tongji University, Shanghai 200092 (China); Zhao, Linghui [State Key Laboratory of Pollution Control and Resources Reuse, School of Environmental Science & Engineering, Tongji University, Shanghai 200092 (China); Luo, Cong [School of Civil and Environmental Engineering, Georgia Institute of Technology, GA 30332 (United States); Dai, Chaomeng; Zhang, Yalei [State Key Laboratory of Pollution Control and Resources Reuse, School of Environmental Science & Engineering, Tongji University, Shanghai 200092 (China)

    2016-05-15

    sequestration. Given the high feasibility and reactivity, =Fe(II) may provide a potential alternative in chelated metals pollution controlling.

  17. Spin Crossover in Fe(II)-M(II) Cyanoheterobimetallic Frameworks (M = Ni, Pd, Pt) with 2-Substituted Pyrazines.

    Science.gov (United States)

    Kucheriv, Olesia I; Shylin, Sergii I; Ksenofontov, Vadim; Dechert, Sebastian; Haukka, Matti; Fritsky, Igor O; Gural'skiy, Il'ya A

    2016-05-16

    Discovery of spin-crossover (SCO) behavior in the family of Fe(II)-based Hofmann clathrates has led to a "new rush" in the field of bistable molecular materials. To date this class of SCO complexes is represented by several dozens of individual compounds, and areas of their potential application steadily increase. Starting from Fe(2+), square planar tetracyanometalates M(II)(CN)4(2-) (M(II) = Ni, Pd, Pt) and 2-substituted pyrazines Xpz (X = Cl, Me, I) as coligands we obtained a series of nine new Hofmann clathrate-like coordination frameworks. X-ray diffraction reveals that in these complexes Fe(II) ion has a pseudo-octahedral coordination environment supported by four μ4-tetracyanometallates forming its equatorial coordination environment. Depending on the nature of X and M, axial positions are occupied by two 2X-pyrazines (X = Cl and M(II) = Ni (1), Pd (2), Pt (3); X = Me and M(II) = Ni (4), Pd (5)) or one 2X-pyrazine and one water molecule (X = I and M(II) = Ni (7), Pd (8), Pt (9)), or, alternatively, two distinct Fe(II) positions with either two pyrazines or two water molecules (X = Me and M(II) = Pt (6)) are observed. Temperature behavior of magnetic susceptibility indicates that all compounds bearing FeN6 units (1-6) display cooperative spin transition, while Fe(II) ions in N5O or N4O2 surrounding are high spin (HS). Structural changes in the nearest Fe(II) environment upon low-spin (LS) to HS transition, which include ca. 10% Fe-N distance increase, lead to the cell expansion. Mössbauer spectroscopy is used to characterize the spin state of all HS, LS, and intermediate phases of 1-9 (see abstract figure). Effects of a pyrazine substituent and M(II) nature on the hyperfine parameters in both spin states are established.

  18. TJ-II project

    International Nuclear Information System (INIS)

    Alejaldre, C.; Gozalo, J.J.A.; Perez, J.B.; Magaria, F.C.; Diaz, J.R.C.; Perez, J.G.; Lopez-Fraguas, A.; Garcia, L.; Krivenski, V.I.; Martin, R.; Navarro, A.P.; Perea, A.; Rodriguez-Yunta, A.; Ayza, M.S.; Varias, A.

    1990-01-01

    The TJ-II device is a medium-size helical-axis stellarator to be built in Madrid. Its main characteristics are potential for high-beta operation; flexibility, i.e., its rotational transform can be varied over a wide range and its shear to some extent; and bean-shaped plasma cross section. The latest understanding of TJ-II physics in the fields of electron cyclotron resonance heating, transport, and magneto-hydrodynamics, and the engineering solutions introduced in its final design are discussed

  19. Alternate cap designs under RCRA regulations

    International Nuclear Information System (INIS)

    Manrod, W.E. III; Yager, R.E.; Craig, P.M.

    1988-01-01

    Low-level radioactive waste and mixed wastes have been disposed of in several sites in the vicinity of the Oak Ridge Y-12 Plant in Tennessee. Most of these materials have been placed in shallow land burial pits (SLB). Closure plans have been developed and approved by appropriate regulatory agencies for several of these sites. A variety of cap (final cover) designs for closure of these sites were investigated to determine their ability to inhibit infiltration of precipitation to the waste. The most effective designs are those that use synthetic materials as drainage layers and/or impermeable liners. The more complex, multi-layer systems perform no better than simpler covers and would complicate construction and increase costs. Despite the successful analytical results described in this paper, additional considerations must be factored into use of geosynthetic as well as natural materials

  20. Lightweight linear alternators with and without capacitive tuning

    Science.gov (United States)

    Niedra, Janis M.

    1993-06-01

    Permanent magnet excited linear alternators rated tens of kW and coupled to free-piston Stirling engines are presently viewed as promising candidates for long term generation of electric power in both space and terrestrial applications. Series capacitive cancellation of the internal inductive reactance of such alternators was considered a viable way to both increase power extraction and to suppress unstable modes of the thermodynamic oscillation. Idealized toroidal and cylindrical alternator geometries are used for a comparative study of the issues of specific mass and capacitive tuning, subject to stability criteria. The analysis shows that the stator mass of an alternator designed to be capacitively tuned is always greater than the minimum achievable stator mass of an alternator designed with no capacitors, assuming equal utilization of materials ratings and the same frequency and power to a resistive load. This conclusion is not substantially altered when the usually lesser masses of the magnets and of any capacitors are added. Within the reported stability requirements and under circumstances of normal materials ratings, this study finds no clear advantage to capacitive tuning. Comparative plots of the various constituent masses are presented versus the internal power factor taken as a design degree of freedom. The explicit formulas developed for stator core, coil, capacitor, and magnet masses and for the degree of magnet utilization provide useful estimates of scaling effects.

  1. Alternative Fuel News: Official Publication of the Clean Cities Network and the Alternative Fuels Data Center, Vol. 4, No. 2

    Energy Technology Data Exchange (ETDEWEB)

    Ficker, C.

    2000-09-08

    This issue of Alternative Fuel News discusses Executive Order 13149 which is designed to not only increase the use of alternative fuel by federal agencies but also to increase the use of fuel efficient vehicles in the federal fleet. Also highlighted is the 6th National Clean Cities Conference and Expo held in San Diego, May 7-10, 2000, which attracted nearly 1,000 people for three action-packed days of alternative fuel activities. The work to develop a market for alternative fuels is more important than ever.

  2. Hadron cancer therapy complex using nonscaling fixed field alternating gradient accelerator and gantry design

    Directory of Open Access Journals (Sweden)

    E. Keil

    2007-05-01

    Full Text Available Nonscaling fixed field alternating gradient (FFAG rings for cancer hadron therapy offer reduced physical aperture and large dynamic aperture as compared to scaling FFAGs. The variation of tune with energy implies the crossing of resonances during acceleration. Our design avoids intrinsic resonances, although imperfection resonances must be crossed. We consider a system of three nonscaling FFAG rings for cancer therapy with 250 MeV protons and 400   MeV/u carbon ions. Hadrons are accelerated in a common radio frequency quadrupole and linear accelerator, and injected into the FFAG rings at v/c=0.1294. H^{+}/C^{6+} ions are accelerated in the two smaller/larger rings to 31 and 250  MeV/68.8 and 400   MeV/u kinetic energy, respectively. The lattices consist of doublet cells with a straight section for rf cavities. The gantry with triplet cells accepts the whole required momentum range at fixed field. This unique design uses either high-temperature superconductors or superconducting magnets reducing gantry magnet size and weight. Elements with a variable field at the beginning and at the end set the extracted beam at the correct position for a range of energies.

  3. Synthesis, structural characterization, and pro-apoptotic activity of 1-indanone thiosemicarbazone platinum(II) and palladium(II) complexes: potential as antileukemic agents.

    Science.gov (United States)

    Gómez, Natalia; Santos, Diego; Vázquez, Ramiro; Suescun, Leopoldo; Mombrú, Alvaro; Vermeulen, Monica; Finkielsztein, Liliana; Shayo, Carina; Moglioni, Albertina; Gambino, Dinorah; Davio, Carlos

    2011-08-01

    In the search for alternative chemotherapeutic strategies against leukemia, various 1-indanone thiosemicarbazones, as well as eight novel platinum(II) and palladium(II) complexes, with the formula [MCl₂(HL)] and [M(HL)(L)]Cl, derived from two 1-indanone thiosemicarbazones were synthesized and tested for antiproliferative activity against the human leukemia U937 cell line. The crystal structure of [Pt(HL1)(L1)]Cl·2MeOH, where L1=1-indanone thiosemicarbazone, was solved by X-ray diffraction. Free thiosemicarbazone ligands showed no antiproliferative effect, but the corresponding platinum(II) and palladium(II) complexes inhibited cell proliferation and induced apoptosis. Platinum(II) complexes also displayed selective apoptotic activity in U937 cells but not in peripheral blood monocytes or the human hepatocellular carcinoma HepG2 cell line used to screen for potential hepatotoxicity. Present findings show that, in U937 cells, 1-indanone thiosemicarbazones coordinated to palladium(II) were more cytotoxic than those complexed with platinum(II), although the latter were found to be more selective for leukemic cells suggesting that they are promising compounds with potential therapeutic application against hematological malignancies. Copyright © 2011 WILEY-VCH Verlag GmbH & Co. KGaA, Weinheim.

  4. Characterization of alternative FBR development strategies

    International Nuclear Information System (INIS)

    Boegel, A.J.; Clausen, M.J.

    1981-08-01

    Near-term decisions regarding the nature and place of the FBR development program must be made. This study is part of a larger program designed to provide the Department of Energy (DOE) with imformation that can be used to make strategic programmatic decisions. The focus of this report is the description of alternative approaches for developing the FBR and the quantification of the duration and cost of each alternative. The time frames of the alternative approaches are investigated in companion reports (White 1981 and Fraley 1981). The results of these analyses will be described in a summary report

  5. Complexes in the Ni2+-imidazole-RN(CH2COO-)2 systems. The crystal structures of tris(imidazole)iminodiacetatonickel(II) monohydrate, hexa(imidazole)nickel(II) bis(N-methyliminodiacetato)nickelate(II) hexahydrate, and tetra(aqua)bis(imidazole)nickel(II) bis(N-benzyliminodiacetato)nickelate(II)

    International Nuclear Information System (INIS)

    Polyakova, I.N.; Sergienko, V.S.; Poznyak, A.L.

    2000-01-01

    Crystals of different compositions, namely, [Ni(Ida)(Im) 3 ] · H 2 O (I), [Ni(Im) 6 ][Ni(Mida) 2 ] · 6H 2 O (II), and [Ni(Im) 2 (H 2 O) 4 ][Ni(Bida) 2 ] (III), have been precipitated from aqueous solutions of the Ni 2+ -Lig 2- Im systems, where Lig 2- is Ida, Mida, and Bida, respectively. The crystal structures of I-III are determined by X-ray diffraction analysis (R = 0.0307, 0.0348, and 0.0302 for 3061, 4706, and 2882 reflections, respectively). Crystals I are built of monomeric mixed-ligand complexes and molecules of crystallization water, which are interlinked by hydrogen bonds into a three-dimensional framework. In II and III, the ligands Lig 2- and Im form charged complexes separately. In II, the cationic and anionic layers of the complexes alternate along the c-axis. Numerous hydrogen bonds involving molecules of crystallization water link the layers into a three-dimensional framework. In III, the cationic and anionic complexes, which serve as proton donors and acceptors, respectively, are bound into layers parallel to the xy plane

  6. Design and alaysis of the PEP-II B-Factory HER QF5 quadrupole magnet

    International Nuclear Information System (INIS)

    Kendall, C.M.; Harvey, A.; Swan, J.; Yamamoto, R.; Yokota, T.; Tanabe, J.; Sullivan, M.; Wienands, U.

    1997-01-01

    The High Energy Ring (HER) in Stanford Linear Accelerator Center's PEP-II B-Factory employs two high field quality quadrupole magnets, labeled QF5, located in the Interaction Region (IR) symmetrically about the Interaction Point (IP), for final horizontal beam focusing. An asymmetric, septum, Collins quadrupole design is required for QF5 as a result of space constraints within the IR. Water cooled square hollow copper conductor is used in a two coil per pole configuration to develop the 61.7 kG/m and 82.2 kG/m gradients required for the HER 9 GeV and 12 GeV energy levels respectively. A 1.45 m long laminated iron core constructed in two halves with a 160 mm diameter aperture and pole tip shims shape the quadruple field. The QF5 field quality requirements include a multipole content of b n /b 2 ≤1 x 10 -4 for n = 3-15 at a radius of 78.1 mm. The QF5 quadrupole mechanical and magnetic design and analysis are presented

  7. KBS-3H design description 2007

    International Nuclear Information System (INIS)

    Autio, J.; Hagros, A.; Johansson, E.

    2008-12-01

    The presented KBS-3H design work was carried out in KBS-3H project in 2004 - 2007, which was a joint project between Svensk Kaernbraenslehantering AB (SKB) in Sweden and Posiva Oy in Finland. The overall objectives of the project phase were to demonstrate that the horizontal deposition alternative is technically feasible and to demonstrate that it fulfils the same long-term safety requirements as the reference design KBS-3V. The KBS-3H design is a variant of the KBS-3 method and an alternative to the KBS-3V design. In the KBS-3H design alternative, multiple canisters containing spent fuel are emplaced at about 420 m depth in bedrock in parallel, 100 - 300 m long, approximately horizontal deposition drifts whereas the KBS-3V design calls for vertical emplacement of the canisters in individual deposition holes. As a result of design work, the two previous KBS-3H repository candidate designs called Basic Design (BD) and design based on Drainage, Artificial Watering and air Evacuation (DAWE) were developed on two different functional principles. At later phase of the project the BD alternative was found not to be robust in drifts with several large inflows and therefore a third less mature alternative called Semi Tight Compartments design (STC) was introduced to function in these conditions. Significant effort was made in the project to resolve studies and testing the functional uncertainties related to buffer behaviour which could e.g. cause piping, erosion, displacement and rupture of distance blocks. Major work was also carried for the design of supercontainer, development of large-scale post-grouting device, Mega-Packer, for grouting of rock, excavation of deposition drifts, layout design and evaluation of residual materials. This report also summarizes and highlights differences between different design alternatives and gives reasoning why DAWE design alternative is seen as the most interesting for future development together with novel less mature STC-alternative

  8. Improvements in SISCOM II technology; Introduccion de Mejoras Tecnologicas en el SISCOM II

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-07-01

    This document is the Final Report for the project Introduccion de Mejoras Tecnologicas en el SISCOM II, or Improvements in SISCOM II Technology. It consists of a brief description of the activities carried out during the project, and several Annexes that explain in a deeper way each result. SISCOM II is the main telemetry system currently in use in the Spanish underground coal mining, but it was developed ten years ago and needed a technological update, which was the objective of this project. The aims of the project were: To develop Hardware and Software for the Out stations currently used (maintenance developments) To design new hardware and software, easier to use in the current and new applications of SISCOM II Both objectives were met, although not in the way originally intended. The main results were: In the field of old Out stations update: A new set of boards for the old Out stations was developed Out station's firmware was updated for the new hardware In the field new hardware and software design: SISCOM II Supervision software was completely rewritten, and now runs under Windows 3.11/Windows 95 (Originally it ran under DOS) A new hardware configuration (the RELIA 2000), easier to assembly, install and reconfigured, together with its firmware, was developed Generally speaking the activities were carried out accordingly to the original schedule, with one exception, due to changes in the market of this type of Systems. Because of the changes, which happened by the end of the project's time span, the structure of the new hardware was somehow different to the original design, although its functionality and performance is similar or even better than those of the original one.

  9. Improvements in SISCOM II technology; Introduccion de Mejoras Tecnologicas en el SISCOM II

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-07-01

    This document is the Final Report for the project Introduccion de Mejoras Tecnologicas en el SISCOM II, or Improvements in SISCOM II Technology. It consists of a brief description of the activities carried out during the project, and several Annexes that explain in a deeper way each result. SISCOM II is the main telemetry system currently in use in the Spanish underground coal mining, but it was developed ten years ago and needed a technological update, which was the objective of this project. The aims of the project were: To develop Hardware and Software for the Out stations currently used (maintenance developments) To design new hardware and software, easier to use in the current and new applications of SISCOM II Both objectives were met, although not in the way originally intended. The main results were: In the field of old Out stations update: A new set of boards for the old Out stations was developed Out station's firmware was updated for the new hardware In the field new hardware and software design: SISCOM II Supervision software was completely rewritten, and now runs under Windows 3.11/Windows 95 (Originally it ran under DOS) A new hardware configuration (the RELIA 2000), easier to assembly, install and reconfigured, together with its firmware, was developed Generally speaking the activities were carried out accordingly to the original schedule, with one exception, due to changes in the market of this type of Systems. Because of the changes, which happened by the end of the project's time span, the structure of the new hardware was somehow different to the original design, although its functionality and performance is similar or even better than those of the original one.

  10. Connecting the dots: chromatin and alternative splicing in EMT.

    Science.gov (United States)

    Warns, Jessica A; Davie, James R; Dhasarathy, Archana

    2016-02-01

    Nature has devised sophisticated cellular machinery to process mRNA transcripts produced by RNA Polymerase II, removing intronic regions and connecting exons together, to produce mature RNAs. This process, known as splicing, is very closely linked to transcription. Alternative splicing, or the ability to produce different combinations of exons that are spliced together from the same genomic template, is a fundamental means of regulating protein complexity. Similar to transcription, both constitutive and alternative splicing can be regulated by chromatin and its associated factors in response to various signal transduction pathways activated by external stimuli. This regulation can vary between different cell types, and interference with these pathways can lead to changes in splicing, often resulting in aberrant cellular states and disease. The epithelial to mesenchymal transition (EMT), which leads to cancer metastasis, is influenced by alternative splicing events of chromatin remodelers and epigenetic factors such as DNA methylation and non-coding RNAs. In this review, we will discuss the role of epigenetic factors including chromatin, chromatin remodelers, DNA methyltransferases, and microRNAs in the context of alternative splicing, and discuss their potential involvement in alternative splicing during the EMT process.

  11. 48 CFR 6302.30 - Alternative dispute resolution methods (Rule 30).

    Science.gov (United States)

    2010-10-01

    ... TRANSPORTATION BOARD OF CONTRACT APPEALS RULES OF PROCEDURE 6302.30 Alternative dispute resolution methods (Rule... Alternative Dispute Resolution (ADR): Settlement Judges and Mini-Trials. These procedures are designed to... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Alternative dispute...

  12. Alternative products to carbazoles in the oxidation of diphenylamines with palladium (II) acetate

    OpenAIRE

    Raposo, M. Manuela M.; Campos, Ana M. F. Oliveira; Shannon, Patrick V. R.

    1997-01-01

    Although simple diphenylamines are conveniently oxidised with Palladium (II) acetate to give carbazoles, for more complex examples, carbazoles are minor products amongst many. CRUP (Portugal). British Council - Treaty of Windsor Programme. Junta Nacional de Investigação Científica e Tecnológica.

  13. Including alternative resources in state renewable portfolio standards: Current design and implementation experience

    International Nuclear Information System (INIS)

    Heeter, Jenny; Bird, Lori

    2013-01-01

    As of October 2012, 29 states, the District of Columbia, and Puerto Rico have instituted a renewable portfolio standard (RPS). Each state policy is unique, varying in percentage targets, timetables, and eligible resources. Increasingly, new RPS polices have included alternative resources. Alternative resources have included energy efficiency, thermal resources, and, to a lesser extent, non-renewables. This paper examines state experience with implementing renewable portfolio standards that include energy efficiency, thermal resources, and non-renewable energy and explores compliance experience, costs, and how states evaluate, measure, and verify energy efficiency and convert thermal energy. It aims to gain insights from the experience of states for possible federal clean energy policy as well as to share experience and lessons for state RPS implementation. - Highlights: • Increasingly, new RPS policies have included alternative resources. • Nearly all states provide a separate tier or cap on the quantity of eligible alternative resources. • Where allowed, non-renewables and energy efficiency are being heavily utilized

  14. Kultur des Alterns. Gestern. Heute. Morgen? The Culture of Aging. Yesterday. Today. Tomorrow?

    Directory of Open Access Journals (Sweden)

    Miriam Haller

    2005-07-01

    Full Text Available Der Sammelband eröffnet verschiedene Perspektiven auf Die Kultur des Alterns von der Antike bis zur Gegenwart. In drei Sektionen (I. Die historische Perspektive, II. Die medizinische Sicht, III. Alter und Altern als Herausforderung für Individuum und Gesellschaft in Gegenwart und Zukunft wird die Sozialgeschichte des Alter(ns und die Geriatrie betrachtet. Dabei wird jede Verengung der Problematik einer alternden Gesellschaft auf renten- und finanzpolitische Aspekte vermieden. Vor diesem Hintergrund werden im letzten Teil aus Sicht von Sozialstatistik, Philosophie und Soziologie Zukunftsperspektiven in den Blick genommen. Geschlechtsspezifische Differenzierungen von Alter und Altern in Geschichte und Gegenwart werden in den meisten Beiträgen vernachlässigt.The anthology offers different perspectives on Die Kultur des Alterns von der Antike bis zur Gegenwart (The Culture of Aging from Antiquity to the Present. The study is divided into three sections (I. The historical perspective, II. The medical view, III. Age and aging as a challenge for the individual and society in the present and the future. He avoids narrowing the problematic of an aging society to merely pensions and financial-political aspects by instead placing the focus on the social history of aging, the elderly, and geriatrics. However, an attempt at examining the future perspectives against this background is only made by social statistics, philosophy, and sociology in the final section. Most contributions do not duly treat gender-specific differentiation in age and aging through history and in the present.

  15. Crossing Active Faults on the Sakhalin II Onshore Pipeline Route: Analysis Methodology and Basic Design

    International Nuclear Information System (INIS)

    Vitali, Luigino; Mattiozzi, Pierpaolo

    2008-01-01

    Twin oil (20 and 24 inch) and gas (20 and 48 inch) pipeline systems stretching 800 km are being constructed to connect offshore hydrocarbon deposits from the Sakhalin II concession in the North to an LNG plant and oil export terminal in the South of Sakhalin island. The onshore pipeline route follows a regional fault zone and crosses individual active faults at 19 locations. Sakhalin Energy, Design and Construction companies took significant care to ensure the integrity of the pipelines, should large seismic induced ground movements occur during the Operational life of the facilities. Complex investigations including the identification of the active faults, their precise location, their particular displacement values and assessment of the fault kinematics were carried out to provide input data for unique design solutions. Lateral and reverse offset displacements of 5.5 and 4.5 m respectively were determined as the single-event values for the design level earthquake (DLE)--the 1000-year return period event. Within the constraints of a pipeline route largely fixed, the underground pipeline fault crossing design was developed to define the optimum routing which would minimize stresses and strain using linepipe materials which had been ordered prior to the completion of detailed design, and to specify requirements for pipe trenching shape, materials, drainage system, etc. This Paper describes the steps followed to formulate the concept of the special trenches and the analytical characteristics of the Model

  16. Solid phase extraction of Cd(II) and Pb(II) using a magnetic metal-organic framework, and their determination by FAAS

    International Nuclear Information System (INIS)

    Sohrabi, Mahmoud Reza; Matbouie, Zahra; Asgharinezhad, Ali Akbar; Dehghani, Ali

    2013-01-01

    We describe a novel magnetic metal-organic framework (MOF) for the preconcentration of Cd(II) and Pb(II) ions. The MOF was prepared from the Fe 3 O 4 -pyridine conjugate and the copper(II) complex of trimesic acid. The MOF was characterized by IR spectroscopy, elemental analysis, SEM and XRD. A Box-Behnken design through response surface methodology and experimental design was used to identify the optimal parameters for preconcentration. Extraction time, amount of magnetic MOF and pH value were found to be critical factors for uptake, while type, volume, concentration of eluent, and elution time are critical in the elution step. The ions were then determined by FAAS. The limits of detection are 0.2 and 1.1 μg L −1 for Cd(II), and Pb(II) ions, respectively, relative standard deviations are −1 of Cd(II) and Pb(II) ions), and the enrichment capacity of the MOF is at around 190 mg g −1 for both ions which is higher than the conventional Fe 3 O 4 -pyridine material. The magnetic MOF was successfully applied to the rapid extraction of trace quantities of Cd(II) and Pb(II) ions in fish, sediment, and water samples. (author)

  17. Layout design in order to improve efficiency in manufacturing

    Science.gov (United States)

    Siregar, I.; Tarigan, U.; Nasution, T. H.

    2018-02-01

    This research was conducted at the company that produces bobbins and ream type cigarette paper. Problems that found on the production process is the back and forth (back tracking) movement. Back and forth (back tracking) movement extending the total distance moved by the material and increase the total moment of transfer materials thus reducing the efficiency of the transfer of materials in the production process. The purpose of this study is to give design for the layout of production facilities in the company, so that the expected production produced by the company can reach the targets set by the management company. The method used in this research is the Graph-Based Construction and Travel Chart Method. The results of the analysis of the proposed layout with Graph-Based Construction was selected with a total value that is equal to the moment of transfer of 780 758 m / year. This result is better than the actual layout in the amount of 1,021,038.12 meters / year and the results of the method Travel Alternative Chart I of 826.236,60 meters/year, Alternative II of 1.004.433,56 meters / year, and Alternative III for 828,467.12 meters/year. The design layout of Graph-Based Construction material increases the transfer efficiency for 23.53%. With this layout proposal, expected production capacity will be increased along with the shortening of the distance of the displacement that must be passed by the material to be processed.

  18. Design spaces

    DEFF Research Database (Denmark)

    2005-01-01

    Digital technologies and media are becoming increasingly embodied and entangled in the spaces and places at work and at home. However, our material environment is more than a geometric abstractions of space: it contains familiar places, social arenas for human action. For designers, the integration...... of digital technology with space poses new challenges that call for new approaches. Creative alternatives to traditional systems methodologies are called for when designers use digital media to create new possibilities for action in space. Design Spaces explores how design and media art can provide creative...... alternatives for integrating digital technology with space. Connecting practical design work with conceptual development and theorizing, art with technology, and usesr-centered methods with social sciences, Design Spaces provides a useful research paradigm for designing ubiquitous computing. This book...

  19. The CDF SVX II detector upgrade

    International Nuclear Information System (INIS)

    Skarha, J.E.

    1993-10-01

    The proposed CDF SVX II detector upgrade for secondary vertex detection during the Fermilab Tevatron Run II collider run is described. The general design and important features of this silicon vertex detector are presented. The CDF physics goals which are addressed by this detector are also given

  20. Biophysical study on the interaction between two palladium(II) complexes and human serum albumin by Multispectroscopic methods

    Energy Technology Data Exchange (ETDEWEB)

    Saeidifar, Maryam, E-mail: saeidifar@merc.ac.ir [Department of Nanotechnology and Advanced Materials, Materials and Energy Research Center, Karaj (Iran, Islamic Republic of); Mansouri-Torshizi, Hassan [Department of Chemistry, University of Sistan and Baluchestan, Zahedan (Iran, Islamic Republic of); Akbar Saboury, Ali [Institute of Biochemistry and Biophysics, University of Tehran, Tehran (Iran, Islamic Republic of)

    2015-11-15

    The interaction of [Pd(bpy)(n-pr-dtc)]Br (I) and ([Pd(phen)(n-pr-dtc)]Br (II) (bpy=2,2′-bipyridine, phen=1,10-phenanthroline and n-pr-dtc=n-propyldithiocarbamate) with human serum albumin (HSA) was investigated using fluorescence, UV–vis absorption and circular dichroism (CD) spectroscopy techniques under simulative physiological conditions (pH=7.4). It was observed that the two complexes interact with HSA via static fluorescence quenching. The thermodynamic parameters indicate that the binding process was spontaneous and that hydrogen bonds and van der Waals forces play a major role in the association of the HSA–Pd(II) complexes. The activation energy (E{sub a}), binding constant (K{sub b}) and number of binding sites (n) of the HSA–Pd(II) complexes were calculated from fluorescence data at 293 K, 303 K and 311 K. The conformational alternations of protein secondary structure in the presence of Pd(II) complexes were demonstrated using synchronous fluorescence, three-dimensional fluorescence spectra, UV–vis absorption and circular dichroism techniques. Furthermore, the apparent distance between donor (HSA) and acceptor (Pd(II) complexes) was determined using fluorescence resonance energy transfer (FRET). The binding studies between these complexes and HSA give us key insights into the transportation, distribution and toxicity of newly design antitumor Pd(II) complexes in human blood. - Highlights: • The HSA binding properties of two Palladium (II) complexes were studied. • Static quenching mechanism is effective in the interaction of HSA with Pd(II) complexes. • Hydrogen bonds and van der Waals forces were involved in the Pd(II) complexes–HSA interaction. • 3D fluorescence was used to study the interaction between two complexes and HSA.

  1. ANALYSIS OF ALTERNATIVE PAYMENT DESIGNS FOR FARMLAND DEVELOPMENT RIGHTS

    OpenAIRE

    Hanson, Steven D.

    1999-01-01

    Four alternative payment rules were examined to evaluate their ability to accomplish the objectives of the development rights purchase program. Paying the true economic value for the development rights does not allow the program to target high quality agricultural land. Modifying the payment strategy by offering a minimum payment will provide some extra incentive for high quality agricultural land in areas with little development pressure, but will provide little help in areas with high devel...

  2. Design of an Integrated Methodology for Analytical Design of Complex Supply Chains

    Directory of Open Access Journals (Sweden)

    Shahid Rashid

    2012-01-01

    Full Text Available A literature review and gap analysis indentifies key limitations of industry best practice when modelling of supply chains. To address these limitations the paper reports on the conception and development of an integrated modelling methodology designed to underpin the analytical design of complex supply chains. The methodology is based upon a systematic deployment of EM, CLD, and SM techniques; the integration of which is achieved via common modelling concepts and decomposition principles. Thereby the methodology facilitates: (i graphical representation and description of key “processing”, “resourcing” and “work flow” properties of supply chain configurations; (ii behavioural exploration of currently configured supply chains, to facilitate reasoning about uncertain demand impacts on supply, make, delivery, and return processes; (iii predictive quantification about relative performances of alternative complex supply chain configurations, including risk assessments. Guidelines for the application of each step of the methodology are described. Also described are recommended data collection methods and expected modelling outcomes for each step. The methodology is being extensively case tested to quantify potential benefits & costs relative to current best industry practice. The paper reflects on preliminary benefits gained during industry based case study modelling and identifies areas of potential improvement.

  3. Exploration of a capability-focused aerospace system of systems architecture alternative with bilayer design space, based on RST-SOM algorithmic methods.

    Science.gov (United States)

    Li, Zhifei; Qin, Dongliang; Yang, Feng

    2014-01-01

    In defense related programs, the use of capability-based analysis, design, and acquisition has been significant. In order to confront one of the most challenging features of a huge design space in capability based analysis (CBA), a literature review of design space exploration was first examined. Then, in the process of an aerospace system of systems design space exploration, a bilayer mapping method was put forward, based on the existing experimental and operating data. Finally, the feasibility of the foregoing approach was demonstrated with an illustrative example. With the data mining RST (rough sets theory) and SOM (self-organized mapping) techniques, the alternative to the aerospace system of systems architecture was mapping from P-space (performance space) to C-space (configuration space), and then from C-space to D-space (design space), respectively. Ultimately, the performance space was mapped to the design space, which completed the exploration and preliminary reduction of the entire design space. This method provides a computational analysis and implementation scheme for large-scale simulation.

  4. Low inductance diode design on the Proto II accelerator for imploding plasma loads

    International Nuclear Information System (INIS)

    Hsing, W.W.; Coats, R.; McDaniel, D.H.; Spielman, R.B.

    1985-01-01

    A new water transmission line convolute, single piece insulator, and double disk feed has been designed and tested on the .125 ohm, 10 TW Proto II accelerator. The water transmission lines have a 5 cm gap to eliminate any water arcing. A two-dimensional magnetic field code was used to calculate the convolute inductance. The authors used an acrylic insulator as well as a single piece, laminated polycarbonate insulator. They have been successfully tested at over 90% of the Shipman criteria for classical insulator breakdown, although the laminations in the polycarbonate insulator failed after a few shots. The anode and cathode each have two pieces and are held together mechanically. The vacuum MITL tapers to a 3 mm minimum gap. The total inductance is 8.4 nH for gas puff loads and 7.8 nH for imploding foil loads

  5. Enabling alternate fuels for commercial aircraft

    OpenAIRE

    Daggett, D.

    2010-01-01

    The following reports on the past four years of work to examine the feasibility, sustainability and economic viability of developing a renewable, greenhouse-gas-neutral, liquid biofuel for commercial aircraft. The sharp increase in environmental concerns, such as global warming, as well as the volatile price fluctuations of fossil fuels, has ignited a search for alternative transportation fuels. However, commercial aircraft can not use present alternative fuels that are designed for ground...

  6. Assessment of 25 kW free-piston Stirling technology alternatives for solar applications

    Science.gov (United States)

    Erbeznik, Raymond M.; White, Maurice A.; Penswick, L. B.; Neely, Ronald E.; Ritter, Darren C.; Wallace, David A.

    1992-01-01

    The final design, construction, and testing of a 25-kW free-piston advanced Stirling conversion system (ASCS) are examined. The final design of the free-piston hydraulic ASCS consists of five subsystems: heat transport subsystem (solar receiver and pool boiler), free-piston hydraulic Stirling engine, hydraulic subsystem, cooling subsystem, and electrical and control subsystem. Advantages and disadvantages are identified for each technology alternative. Technology alternatives considered are gas bearings vs flexure bearings, stationary magnet linear alternator vs moving magnetic linear alternator, and seven different control options. Component designs are generated using available in-house procedures to meet the requirements of the free-piston Stirling convertor configurations.

  7. Environmentally benign manufacturing of compact disc stampers[Final Phase II report]; FINAL

    International Nuclear Information System (INIS)

    None

    1999-01-01

    Optical data storage is currently a$10B/yr. business. With the introduction of the high capacity Digital Versatile Disc (D/D) as well as the continued growth of CD-Audio and CD-ROM worldwide sales of optical data products as a whole are growing at rate of more than 10% per year. In North America, more than 2.5 billion optical discs will be sold in 1998. By 1999, the numbers of optical discs produced for the North American market will grow to almost three billion. The optical disc manufacturing industry is dominated by Asian and European companies (e.g. Sony of Japan and Philips of Netherlands). Prism Corporation has created a process that could significantly improve US competitiveness in the business of optical disc production. The objectives of the Phase II STTR project were to build and test an ion machining system (IMS) for stamper fabrication, prove overall manufacturing system feasibility by fabrication stampers and replicas, and evaluate alternative materials and alternative process parameters to optimize the process. During tie period of the Phase II project Prism Corporation was able to meet these objectives. In the course of doing so, adjustments had been made to better the project and in turn the final product. An ion machining system was designed and built that produced stampers ready for the molding process. Also, many control steps in the manufacturing process were studied to improve the current process and make it even more compatible with the industry standards, fitting seamlessly into current manufacturing lines

  8. BWR Steam Dryer Alternating Stress Assessment Procedures

    Energy Technology Data Exchange (ETDEWEB)

    Morante, R. J. [Brookhaven National Lab. (BNL), Upton, NY (United States); Hambric, S. A. [Brookhaven National Lab. (BNL), Upton, NY (United States); Ziada, S. [Brookhaven National Lab. (BNL), Upton, NY (United States)

    2016-12-01

    This report presents an overview of Boiling Water Reactor (BWR) steam dryer design; the fatigue cracking failures that occurred at the Quad Cities (QC) plants and their root causes; a history of BWR Extended Power Uprates (EPUs) in the USA; and a discussion of steam dryer modifications/replacements, alternating stress mechanisms on steam dryers, and structural integrity evaluations (static and alternating stress).

  9. Complementary and Alternative Approaches to Pain Relief during Labor

    Directory of Open Access Journals (Sweden)

    Michel Tournaire

    2007-01-01

    Full Text Available This review evaluated the effect of complementary and alternative medicine on pain during labor with conventional scientific methods using electronic data bases through 2006 were used. Only randomized controlled trials with outcome measures for labor pain were kept for the conclusions. Many studies did not meet the scientific inclusion criteria. According to the randomized control trials, we conclude that for the decrease of labor pain and/or reduction of the need for conventional analgesic methods: (i There is an efficacy found for acupressure and sterile water blocks. (ii Most results favored some efficacy for acupuncture and hydrotherapy. (iii Studies for other complementary or alternative therapies for labor pain control have not shown their effectiveness.

  10. 'Poker' association of weekly alternating 5-fluorouracil, irinotecan, bevacizumab and oxaliplatin (FIr-B/FOx) in first line treatment of metastatic colorectal cancer: a phase II study

    International Nuclear Information System (INIS)

    Bruera, Gemma; Ficorella, Corrado; Ricevuto, Enrico; Santomaggio, Alessandra; Cannita, Katia; Baldi, Paola Lanfiuti; Tudini, Marianna; De Galitiis, Federica; Mancini, Maria; Marchetti, Paolo; Antonucci, Adelmo

    2010-01-01

    This phase II study investigated efficacy and safety of weekly alternating Bevacizumab (BEV)/Irinotecan (CPT-11) or Oxaliplatin (OHP) associated to weekly 5-Fluorouracil (5-FU) in first line treatment of metastatic colorectal carcinoma (MCRC). Simon two-step design: delta 20% (p 0 50%, p 1 70%), power 80%, α 5%, β 20%. Projected objective responses (ORR): I step, 8/15 patients (pts); II step 26/43 pts. Schedule: weekly 12 h-timed-flat-infusion/5-FU 900 mg/m 2 , days 1-2, 8-9, 15-16, 22-23; CPT-11 160 mg/m 2 plus BEV 5 mg/kg, days 1,15; OHP at three dose-levels, 60-70-80 mg/m 2 , days 8, 22; every 4 weeks. Fifty consecutive, unselected pts < 75 years were enrolled: median age 63; young-elderly (yE) 24 (48%); liver metastases (LM) 33 pts, 66% Achieved OHP recommended dose, 80 mg/m 2 . ORR 82% intent-to-treat and 84% as-treated analysis. Median progression-free survival 12 months. Equivalent efficacy was obtained in yE pts. Liver metastasectomies were performed in 26% of all pts and in 39% of pts with LM. After a median follow-up of 21 months, median overall survival was 28 months. Cumulative G3-4 toxicities per patient: diarrhea 28%, mucositis 6%, neutropenia 10%, hypertension 2%. They were equivalent in yE pts. Limiting toxicity syndromes (LTS), consisting of the dose-limiting toxicity, associated or not to G2 or limiting toxicities: 44% overall, 46% in yE. Multiple versus single site LTS, respectively: overall, 24% versus 20%; yE pts, 37.5% versus 8%. Poker combination shows high activity and efficacy in first line treatment of MCRC. It increases liver metastasectomies rate and can be safely administered. Osservatorio Nazionale sulla Sperimentazione Clinica dei Medicinali (OsSC) Agenzia Italiana del Farmaco (AIFA) Numero EudraCT 2007-004946-34

  11. 10 CFR Appendix D to Part 52 - Design Certification Rule for the AP1000 Design

    Science.gov (United States)

    2010-01-01

    ... severe accident mitigation design alternatives in appendix 1B of the generic DCD are not part of this... issues concerning severe accident mitigation design alternatives associated with the information in the... appendix whose site parameters are within those specified in the severe accident mitigation design...

  12. NASA TEERM Hexavalent Chrome Alternatives Projects

    Science.gov (United States)

    Kessel, Kurt; Rothgeb, Matt

    2011-01-01

    This slide presentation reviews the NASA project to select an alternative to hexavalent chrome in the aerospace industry. Included is a recent historic testing and research that the Agency has performed on (1) the external tank, (2) the shuttle orbiter, (3) the Shuttle Rocket Booster, and (4) the Space Shuttle Main Engine. Other related Technology Evaluation for Environmental Risk Mitigation (TEERM) projects are reviewed. The Phase I process of the project performed testing of alternatives the results are shown in a chart for different coating systems. International collaboration was also reviewed. Phase II involves further testing of pretreatment and primers for 6 and 12 months of exposure to conditions at Launch Pad and the beach. Further test were performed to characterize the life cycle corrosion of the space vehicles. A new task is described as a joint project with the Department of Defense to identify a Hex Chrome Free Coatings for Electronics.

  13. LCLS-II Cryomodules Production at Fermilab

    Energy Technology Data Exchange (ETDEWEB)

    Arkan, Tug [Fermilab; Grimm, Chuck [Fermilab; Kaluzny, Joshua [Fermilab; Orlov, Yuriy [Fermilab; Peterson, Thomas [Fermilab; Premo, Ken [Fermilab

    2017-05-01

    LCLS-II is an upgrade project for the linear coherent light source (LCLS) at SLAC. The LCLS-II linac will consist of thirty-five 1.3 GHz and two 3.9 GHz superconducting RF continuous wave (CW) cryomodules that Fermilab and Jefferson Lab (JLab) will assemble in collaboration with SLAC. The LCLS-II 1.3 GHz cryomodule design is based on the European XFEL pulsed-mode cryomodule design with modifications needed for CW operation. Fermilab and JLab will each assemble and test a prototype 1.3 GHz cryomodule to assess the results of the CW modifications, in advance of 16 and 17 production 1.3 GHz cryomodules, respectively. Fermilab is solely responsible for the 3.9 GHz cryomodules. After the prototype cryomodule tests are complete and lessons learned incorporated, both laboratories will increase their cryomodule production rates to meet the challenging LCLS-II project requirement of approximately one cryomodule per month per laboratory. This paper presents the Fermilab Cryomodule Assembly Facility (CAF) infrastructure for LCLS-II cryomodule production, the Fermilab prototype 1.3 GHz CW cryomodule (pCM) assembly and readiness for production assembly.

  14. Accident analysis for PRC-II reactor

    International Nuclear Information System (INIS)

    Wei Yongren; Tang Gang; Wu Qing; Lu Yili; Liu Zhifeng

    1997-12-01

    The computer codes, calculation models, transient results, sensitivity research, design improvement, and safety evaluation used in accident analysis for PRC-II Reactor (The Second Pulsed Reactor in China) are introduced. PRC-II Reactor is built in big populous city, so the public pay close attention to reactor safety. Consequently, Some hypothetical accidents are analyzed. They include an uncontrolled control rod withdrawal at rated power, a pulse rod ejection at rated power, and loss of coolant accident. Calculation model which completely depict the principle and process for each accident is established and the relevant analysis code is developed. This work also includes comprehensive computing and analyzing transients for each accident of PRC-II Reactor; the influences in the reactor safety of all kind of sensitive parameters; evaluating the function of engineered safety feature. The measures to alleviate the consequence of accident are suggested and taken in the construction design of PRC-II Reactor. The properties of reactor safety are comprehensively evaluated. A new advanced calculation model (True Core Uncovered Model) of LOCA of PRC-II Reactor and the relevant code (MCRLOCA) are first put forward

  15. Status Report on PEP-II Performance

    International Nuclear Information System (INIS)

    Matter, Regina S.

    2002-01-01

    PEP-II [1-9] is an e+e- collider with asymmetric energies (3.1 and 9 GeV, respectively) in a 2200 m tunnel at the Stanford Linear Accelerator Center. The collider produces B mesons to study a particle physics effect called CP violation as well as other physics topics. PEP-II was completed in 1998 with the first luminosity generated in July of that year. The installation of the BaBar Detector was finished in May 1999. The overall layout of PEP-II is shown in Figure 1 and the interaction region of PEP-II in Figure 2. The accelerator parameters and achievements of the High Energy Ring (HER) are listed in Table 1 and those for the Low Energy Ring (LER) in Table 2. The two beams collide at a single point in the IR2 hall where the BaBar detector is located. Beam parameters at the best luminosity are shown in Table 3 and PEP-II milestones in Table 4. In August 1999 PEP-II passed the world's record for luminosity which was 8.1x10 32 /cm 2 /s. The present luminosity in PEP-II is 2.15x10 33 /cm 2 /s which is 72% of the design. In June 2000 PEP-II delivered an integrated luminosity of 150 pb -1 in one day, which is above the design integrated luminosity per day of 135 pb -1 . Over the past year PEP-II has delivered over 12 fb -1 to BaBar. BaBar has logged over 11 pb -1 . The present plan is collide until the end of October 2000 followed by a three month installation period

  16. Central receiver solar thermal power system. Phase 1. CDRL item 2; Pilot Plant preliminary design report. Volume II. System decription and system analysis

    Energy Technology Data Exchange (ETDEWEB)

    Hallet, Jr., R. W.; Gervais, R. L.

    1977-10-01

    An active system analysis and integration effort has been maintained. These activities have included the transformation of initial program requirements into a preliminary system design, the evolution of subsystem requirements which lay the foundation for subsystem design and test activity, and the overseeing of the final preliminary design effort to ensure that the subsystems are operationally compatible and capable of producing electricity at the lowest possible cost per unit of energy. Volume II of the Preliminary Design Report presents the results of the overall system effort that went on during this contract. The effort is assumed to include not only the total system definition and design but also all subsystem interactions.

  17. Waste Water Disposal Design And Management II

    International Nuclear Information System (INIS)

    Yang, Sang Hyeon; Lee, Jung Su

    2004-04-01

    This book is written about design and management of waste water disposal like settling, floating, aeration and filtration. It explains in detail solo settling, flocculant settling, zone settling, multi-level settling, floating like PPI oil separator, structure of skimming tank and design of skimming tank, water treatment and aeration, aeration device, deaeration like deaeration device for disposal processing of sewage, filtration such as structure and design of Micro-floc filtration, In-line filtration and design of slow sand filter bed.

  18. Biosorption of Cd(II), Ni(II) and Pb(II) from aqueous solution by dried biomass of aspergillus niger: application of response surface methodology to the optimization of process parameters

    Energy Technology Data Exchange (ETDEWEB)

    Amini, Malihe; Younesi, Habibollah [Department of Environmental Science, Faculty of Natural Resources and Marine Sciences, Tarbiat Modares University, Noor (Iran)

    2009-10-15

    In this study, the biosorption of Cd(II), Ni(II) and Pb(II) on Aspergillus niger in a batch system was investigated, and optimal condition determined by means of central composite design (CCD) under response surface methodology (RSM). Biomass inactivated by heat and pretreated by alkali solution was used in the determination of optimal conditions. The effect of initial solution pH, biomass dose and initial ion concentration on the removal efficiency of metal ions by A. niger was optimized using a design of experiment (DOE) method. Experimental results indicated that the optimal conditions for biosorption were 5.22 g/L, 89.93 mg/L and 6.01 for biomass dose, initial ion concentration and solution pH, respectively. Enhancement of metal biosorption capacity of the dried biomass by pretreatment with sodium hydroxide was observed. Maximal removal efficiencies for Cd(II), Ni(III) and Pb(II) ions of 98, 80 and 99% were achieved, respectively. The biosorption capacity of A. niger biomass obtained for Cd(II), Ni(II) and Pb(II) ions was 2.2, 1.6 and 4.7 mg/g, respectively. According to these observations the fungal biomass of A. niger is a suitable biosorbent for the removal of heavy metals from aqueous solutions. Multiple response optimization was applied to the experimental data to discover the optimal conditions for a set of responses, simultaneously, by using a desirability function. (Abstract Copyright [2009], Wiley Periodicals, Inc.)

  19. Laparoscopic versus open surgery for rectal cancer (COLOR II)

    DEFF Research Database (Denmark)

    van der Pas, Martijn Hgm; Haglind, Eva; Cuesta, Miguel A

    2013-01-01

    Laparoscopic surgery as an alternative to open surgery in patients with rectal cancer has not yet been shown to be oncologically safe. The aim in the COlorectal cancer Laparoscopic or Open Resection (COLOR II) trial was to compare laparoscopic and open surgery in patients with rectal cancer....

  20. Belle II silicon vertex detector

    Energy Technology Data Exchange (ETDEWEB)

    Adamczyk, K. [H. Niewodniczanski Institute of Nuclear Physics, Krakow 31-342 (Poland); Aihara, H. [Department of Physics, University of Tokyo, Tokyo 113-0033 (Japan); Angelini, C. [Dipartimento di Fisica, Università di Pisa, I-56127 Pisa (Italy); INFN Sezione di Pisa, I-56127 Pisa (Italy); Aziz, T.; Babu, V. [Tata Institute of Fundamental Research, Mumbai 400005 (India); Bacher, S. [H. Niewodniczanski Institute of Nuclear Physics, Krakow 31-342 (Poland); Bahinipati, S. [Indian Institute of Technology Bhubaneswar, Satya Nagar (India); Barberio, E.; Baroncelli, Ti.; Baroncelli, To. [School of Physics, University of Melbourne, Melbourne, Victoria 3010 (Australia); Basith, A.K. [Indian Institute of Technology Madras, Chennai 600036 (India); Batignani, G. [Dipartimento di Fisica, Università di Pisa, I-56127 Pisa (Italy); INFN Sezione di Pisa, I-56127 Pisa (Italy); Bauer, A. [Institute of High Energy Physics, Austrian Academy of Sciences, 1050 Vienna (Austria); Behera, P.K. [Indian Institute of Technology Madras, Chennai 600036 (India); Bergauer, T. [Institute of High Energy Physics, Austrian Academy of Sciences, 1050 Vienna (Austria); Bettarini, S. [Dipartimento di Fisica, Università di Pisa, I-56127 Pisa (Italy); INFN Sezione di Pisa, I-56127 Pisa (Italy); Bhuyan, B. [Indian Institute of Technology Guwahati, Assam 781039 (India); Bilka, T. [Faculty of Mathematics and Physics, Charles University, 121 16 Prague (Czech Republic); Bosi, F. [INFN Sezione di Pisa, I-56127 Pisa (Italy); Bosisio, L. [Dipartimento di Fisica, Università di Trieste, I-34127 Trieste (Italy); INFN Sezione di Trieste, I-34127 Trieste (Italy); and others

    2016-09-21

    The Belle II experiment at the SuperKEKB collider in Japan is designed to indirectly probe new physics using approximately 50 times the data recorded by its predecessor. An accurate determination of the decay-point position of subatomic particles such as beauty and charm hadrons as well as a precise measurement of low-momentum charged particles will play a key role in this pursuit. These will be accomplished by an inner tracking device comprising two layers of pixelated silicon detector and four layers of silicon vertex detector based on double-sided microstrip sensors. We describe herein the design, prototyping and construction efforts of the Belle-II silicon vertex detector.

  1. DE-FOA-EE0005502 Advanced Percussive Drilling Technology for Geothermal Exploration and Development Phase II Report.

    Energy Technology Data Exchange (ETDEWEB)

    Su, Jiann-Cherng [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Raymond, David W. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Prasad, Somuri V. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Wolfer, Dale R. [Atlas-Copco Secoroc, LLC, Fagersta (Sweden)

    2017-05-01

    Percussive hammers are a promising advance in drilling technology for geothermal since they rely upon rock reduction mechanisms that are well-suited for use in the hard, brittle rock characteristic of geothermal formations. The project research approach and work plan includes a critical path to development of a high-temperature (HT) percussive hammer using a two- phase approach. The work completed in Phase I of the project demonstrated the viability of percussive hammers and that solutions to technical challenges in design, material technology, and performance are likely to be resolved. Work completed in Phase II focused on testing the findings from Phase I and evaluating performance of the materials and designs at high- operating temperatures. A high-operating temperature (HOT) drilling facility was designed, built, and used to test the performance of the DTH under extreme conditions. Results from the testing indicate that a high-temperature capable hammer can be developed and is a viable alternative for user in the driller's toolbox.

  2. Design-based stereological analysis of the lung parenchymal architecture and alveolar type II cells in surfactant protein A and D double deficient mice

    DEFF Research Database (Denmark)

    Jung, A; Allen, L; Nyengaard, Jens Randel

    2005-01-01

    Alveolar epithelial type II cells synthesize and secrete surfactant. The surfactant-associated proteins A and D (SP-A and SP-D), members of the collectin protein family, participate in pulmonary immune defense, modulation of inflammation, and surfactant metabolism. Both proteins are known to have......, but the mean volume of a single lamellar body remains constant. These results demonstrate that chronic deficiency of SP-A and SP-D in mice leads to parenchymal remodeling, type II cell hyperplasia and hypertrophy, and disturbed intracellular surfactant metabolism. The design-based stereological approach...

  3. Digital optical computer II

    Science.gov (United States)

    Guilfoyle, Peter S.; Stone, Richard V.

    1991-12-01

    OptiComp is currently completing a 32-bit, fully programmable digital optical computer (DOC II) that is designed to operate in a UNIX environment running RISC microcode. OptiComp's DOC II architecture is focused toward parallel microcode implementation where data is input in a dual rail format. By exploiting the physical principals inherent to optics (speed and low power consumption), an architectural balance of optical interconnects and software code efficiency can be achieved including high fan-in and fan-out. OptiComp's DOC II program is jointly sponsored by the Office of Naval Research (ONR), the Strategic Defense Initiative Office (SDIO), NASA space station group and Rome Laboratory (USAF). This paper not only describes the motivational basis behind DOC II but also provides an optical overview and architectural summary of the device that allows the emulation of any digital instruction set.

  4. Test Plan for Hydrogen Getters Project - Phase II

    International Nuclear Information System (INIS)

    Mroz, G.

    1999-01-01

    Hydrogen levels in many transuranic (TRU) waste drums are above the compliance threshold, therefore deeming the drums non-shippable to the Waste Isolation Pilot Plant (WIPP). Hydrogen getters (alkynes and dialkynes) are known to react irreversibly with hydrogen in the presence of certain catalysts. The primary purpose of this investigation is to ascertain the effectiveness of a hydrogen getter in an environment that contains gaseous compounds commonly found in the headspace of drums containing TRU waste. It is not known whether the volatile organic compounds (VOCs) commonly found in the headspace of TRU waste drums will inhibit (''poison'') the effectiveness of the hydrogen getter. The result of this study will be used to assess the feasibility of a hydrogen-getter system, which is capable of removing hydrogen from the payload containers or the Transuranic Package Transporter-II (TRUPACT-II) inner containment vessel to increase the quantity of TRU waste that can be shipped to the WIPP. Phase II for the Hydrogen Getters Project will focus on four primary objectives: Conduct measurements of the relative permeability of hydrogen and chlorinated VOCs through Tedlar (and possibly other candidate packaging materials) Test alternative getter systems as alternatives to semi-permeable packaging materials. Candidates include DEB/Pd/Al2O3 and DEB/Cu-Pd/C. Develop, test, and deploy kinetic optimization model Perform drum-scale test experiments to demonstrate getter effectiveness

  5. HIBAL Program. Preliminary Warhead-Design. Volume II. Appendices.

    Science.gov (United States)

    1980-09-15

    Mild Steel (iAi i018). ............. 11-2 B. SAE 4130 .. .. .. .... ...... ....... 11-3 C. SAE 4140 ......... .... .... ......... 11-3 D, SAE 4340...11-7 - Test Data for SAE 4140 Steel Frag- ments ...... ................ 11-14 Figure II-7A - 4142 ... .............. 11-15 Figure 11-8 - Test Data...included the following types of steel: SAE 1018, 4130, 4140 and 4340; 5-317 and 5-876 Carpenter tool steel; Anico HY-80 and SSS-100 steel; AISI-S7

  6. Designing Alternative Transport Methods for the Distributed Data Collection of ATLAS EventIndex Project

    CERN Document Server

    Fernandez Casani, Alvaro; The ATLAS collaboration

    2016-01-01

    One of the key and challenging tasks of the ATLAS EventIndex project is to index and catalog all the produced events not only at CERN but also at hundreds of worldwide grid sites, and convey the data in real time to a central Hadoop instance at CERN. While this distributed data collection is currently operating correctly in production, there are some issues that might impose performance bottlenecks in the future, with an expected rise in the event production and reprocessing rates. In this work, we first describe the current approach based on a messaging system, which conveys the data from the sources to the central catalog, and we identify some weaknesses of this system. Then, we study a promising alternative transport method based on an object store, presenting a performance comparison with the current approach, and the architectural design changes needed to adapt the system to the next run of the ATLAS experiment at CERN.

  7. Design and simulations of a spectral efficient optical code division multiple access scheme using alternated energy differentiation and single-user soft-decision demodulation

    Science.gov (United States)

    A. Garba, Aminata

    2017-01-01

    This paper presents a new approach to optical Code Division Multiple Access (CDMA) network transmission scheme using alternated amplitude sequences and energy differentiation at the transmitters to allow concurrent and secure transmission of several signals. The proposed system uses error control encoding and soft-decision demodulation to reduce the multi-user interference at the receivers. The design of the proposed alternated amplitude sequences, the OCDMA energy modulators and the soft decision, single-user demodulators are also presented. Simulation results show that the proposed scheme allows achieving spectral efficiencies higher than several reported results for optical CDMA and much higher than the Gaussian CDMA capacity limit.

  8. Water-related planning and design at energy firms

    International Nuclear Information System (INIS)

    Abbey, D.; Lucero, F.

    1980-11-01

    Water related planning and design at energy firms are examined. By identifying production alternatives and specifying the cost of these alternatives under a variety of conditions, one gains insight into the future pattern of water use in the energy industry and the response of industry to water-related regulation. In Part II, the three principal decisions of industry that affect water allocation are reviewed: where to build plants, where to get water, and how much water to use. The cost of water use alternatives is reviewed. Part III presents empirical data to substantiate the inferences derived from engineering/economic analysis. The source of water, type of cooling system, and pattern of discharge for electric plants constructed during the 1970s or projected to come on line in this decade are reported. In the 1970s in the US, there was a trend away from once-through cooling toward use of evaporative cooling. Freshwater, as a source of supply, and discharge of effluent were standard practice. In the 1980s, almost all new capacity in the states and basins surveyed will use evaporative cooling. It is pointed out that a thorough understanding of industrial water use economics and water markets is a precursor to successful regulation

  9. High performance inboard shield design for the compact TIBER-II test reactor: Appendix A-2

    International Nuclear Information System (INIS)

    El-Guebaly, L.A.; Sviatoslavsky, I.N.

    1987-01-01

    The compactness of the TIBER-II reactor has placed a premium on the design of a high performance inboard shield to protect the inner legs of the toroidal field (TF) coils. The available space for shield is constrained to 48 cm and the use of tungsten is mandatory to protect the magnet against the 1.53 MW/m 2 neutron wall loading. The primary requirement for the shield is to limit the fast neutron fluence to 10 19 n/cm 2 . In an optimization study, the performance of various candidate materials for protecting the magnet was examined. The optimum shield consists of a 40 cm thick W layer, followed by an 8 cm thick H 2 O/LiNO 3 layer. The mechanical design of the shield calls for tungsten blocks within SS stiffened panels. All the coolant channels are vertical with more of them in the front where there is a high heat load. The coolant pressure is 0.2 MPa and the maximum structural surface temperature is 0 C. The effects of the detailed mechanical design of the shield and the assembly gaps between the shield sectors on the damage in the magnet were analyzed and peaking factors of ∼2 were found at the hot spots. 2 refs., 6 figs., 2 tabs

  10. Synthesis and characterisation of Cu(II), Ni(II), Mn(II), Zn(II) and VO(II ...

    Indian Academy of Sciences (India)

    Unknown

    Synthesis and characterisation of Cu(II), Ni(II), Mn(II), Zn(II) and VO(II) Schiff base complexes derived from o-phenylenediamine and acetoacetanilide. N RAMAN*, Y PITCHAIKANI RAJA and A KULANDAISAMY. Department of Chemistry, VHNSN College, Virudhunagar 626 001, India e-mail: ra_man@123india.com.

  11. Optimal cost-effective designs of Phase II proof of concept trials and associated go-no go decisions.

    Science.gov (United States)

    Chen, Cong; Beckman, Robert A

    2009-01-01

    This manuscript discusses optimal cost-effective designs for Phase II proof of concept (PoC) trials. Unlike a confirmatory registration trial, a PoC trial is exploratory in nature, and sponsors of such trials have the liberty to choose the type I error rate and the power. The decision is largely driven by the perceived probability of having a truly active treatment per patient exposure (a surrogate measure to development cost), which is naturally captured in an efficiency score to be defined in this manuscript. Optimization of the score function leads to type I error rate and power (and therefore sample size) for the trial that is most cost-effective. This in turn leads to cost-effective go-no go criteria for development decisions. The idea is applied to derive optimal trial-level, program-level, and franchise-level design strategies. The study is not meant to provide any general conclusion because the settings used are largely simplified for illustrative purposes. However, through the examples provided herein, a reader should be able to gain useful insight into these design problems and apply them to the design of their own PoC trials.

  12. Particle swarm optimization: an alternative in marine propeller optimization?

    Science.gov (United States)

    Vesting, F.; Bensow, R. E.

    2018-01-01

    This article deals with improving and evaluating the performance of two evolutionary algorithm approaches for automated engineering design optimization. Here a marine propeller design with constraints on cavitation nuisance is the intended application. For this purpose, the particle swarm optimization (PSO) algorithm is adapted for multi-objective optimization and constraint handling for use in propeller design. Three PSO algorithms are developed and tested for the optimization of four commercial propeller designs for different ship types. The results are evaluated by interrogating the generation medians and the Pareto front development. The same propellers are also optimized utilizing the well established NSGA-II genetic algorithm to provide benchmark results. The authors' PSO algorithms deliver comparable results to NSGA-II, but converge earlier and enhance the solution in terms of constraints violation.

  13. 33 CFR 154.1026 - Qualified individual and alternate qualified individual.

    Science.gov (United States)

    2010-07-01

    ... alternate must: (1) Be located in the United States; (2) Speak fluent English; (3) Be familiar with the... facility may designate an organization to fulfill the role of the qualified individual and the alternate...

  14. Improvements in SISCOM II Technology; Introduccion de Mejoras Tecnologicas en el SISCOM II

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-12-31

    This document is the Final Report for the project. Improvements in SISCOM II Technology. It consists of a brief description of the activities carried out during the project, and several Annexes that explain in a deeper way each result. SISCOM II is the main telemetry system currently in use in the Spanish underground coal mining, but it was developed ten years ago and needed a technological update, which was the objective of this project. The aims of the project were: - To develop Hardware and Software for the Outstations currently used (maintenance developments) - To design new hardware and software, easier to use in the current and new applications of SISCOM II Both objectives were met, although not in the way originally intended. The main results were: In the field of old Outstations update: - A new set of boards for the old Outstations was developed - Outstations`s firmware was updated for the new hardware In the field new hardware and software design: - SISCOM II Supervision software was completely rewritten, and now runs under Windows 3.11/Windows 95 (Originally it ran under DOS) - A new hardware configuration (the RELIA 2000), easier to assembly, install and re configure, together with its firmware, was developed Generally speaking the activities were carried out accordingly to the original schedule, with one exception, due to changes in the market of this type of Systems. Because of the changes, which happened by the end of the project`s time span, the structure of the new hardware was somehow different to the original design, although its functionality and performance is similar or even better than those of the original one. (Author)

  15. Improvements in SISCOM II Technology; Introduccion de Mejoras Tecnologicas en el SISCOM II

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-12-31

    This document is the Final Report for the project. Improvements in SISCOM II Technology. It consists of a brief description of the activities carried out during the project, and several Annexes that explain in a deeper way each result. SISCOM II is the main telemetry system currently in use in the Spanish underground coal mining, but it was developed ten years ago and needed a technological update, which was the objective of this project. The aims of the project were: - To develop Hardware and Software for the Outstations currently used (maintenance developments) - To design new hardware and software, easier to use in the current and new applications of SISCOM II Both objectives were met, although not in the way originally intended. The main results were: In the field of old Outstations update: - A new set of boards for the old Outstations was developed - Outstations`s firmware was updated for the new hardware In the field new hardware and software design: - SISCOM II Supervision software was completely rewritten, and now runs under Windows 3.11/Windows 95 (Originally it ran under DOS) - A new hardware configuration (the RELIA 2000), easier to assembly, install and re configure, together with its firmware, was developed Generally speaking the activities were carried out accordingly to the original schedule, with one exception, due to changes in the market of this type of Systems. Because of the changes, which happened by the end of the project`s time span, the structure of the new hardware was somehow different to the original design, although its functionality and performance is similar or even better than those of the original one. (Author)

  16. Design of Networked Home Automation System Based on μCOS-II and AMAZON

    Directory of Open Access Journals (Sweden)

    Liu Jianfeng

    2015-01-01

    Full Text Available In recent years, with the popularity of computers and smart phones and the development of intelligent building in electronics industry, people’s requirement of living environment is gradually changing. The intelligent home furnishing building has become the new focus of people purchasing. And the networked home automation system which relies on the advanced network technology to connect with air conditioning, lighting, security, curtains, TV, water heater and other home furnishing systems into a local area network becomes a networked control system. μC /OS is a real-time operating system with the free open-source code, the compact structure and the preemptive real-time kernel. In this paper, the author focuses on the design of home furnishing total controller based on AMAZON multimedia processor and μC/OS-II real-time operating system, and achieves the remote access connection and control through the Ethernet.

  17. Hanford spent nuclear fuel project recommended path forward, volume III: Alternatives and path forward evaluation supporting documentation

    International Nuclear Information System (INIS)

    Fulton, J.C.

    1994-10-01

    Volume I of the Hanford Spent Nuclear Fuel Project - Recommended Path Forward constitutes an aggressive series of projects to construct and operate systems and facilities to safely retrieve, package, transport, process, and store K Basins fuel and sludge. Volume II provided a comparative evaluation of four Alternatives for the Path Forward and an evaluation for the Recommended Path Forward. Although Volume II contained extensive appendices, six supporting documents have been compiled in Volume III to provide additional background for Volume II

  18. Schema Design Alternatives for Multi-Granular Data Warehousing

    DEFF Research Database (Denmark)

    Iftikhar, Nadeem; Pedersen, Torben Bach

    2010-01-01

    Data warehousing is widely used in industry for reporting and analysis of huge volumes of data at different levels of detail. In general, data warehouses use standard dimensional schema designs to organize their data. However, current data warehousing schema designs fall short in their ability...

  19. Biologically active new Fe(II, Co(II, Ni(II, Cu(II, Zn(II and Cd(II complexes of N-(2-thienylmethylenemethanamine

    Directory of Open Access Journals (Sweden)

    C. SPÎNU

    2008-04-01

    Full Text Available Iron(II, cobalt(II, nickel (II, copper (II, zinc(II and cadmium(II complexes of the type ML2Cl2, where M is a metal and L is the Schiff base N-(2-thienylmethylenemethanamine (TNAM formed by the condensation of 2-thiophenecarboxaldehyde and methylamine, were prepared and characterized by elemental analysis as well as magnetic and spectroscopic measurements. The elemental analyses suggest the stoichiometry to be 1:2 (metal:ligand. Magnetic susceptibility data coupled with electronic, ESR and Mössbauer spectra suggest a distorted octahedral structure for the Fe(II, Co(II and Ni(II complexes, a square-planar geometry for the Cu(II compound and a tetrahedral geometry for the Zn(II and Cd(II complexes. The infrared and NMR spectra of the complexes agree with co-ordination to the central metal atom through nitrogen and sulphur atoms. Conductance measurements suggest the non-electrolytic nature of the complexes, except for the Cu(II, Zn(II and Cd(II complexes, which are 1:2 electrolytes. The Schiff base and its metal chelates were screened for their biological activity against Escherichia coli, Staphylococcus aureus and Pseudomonas aeruginosa and the metal chelates were found to possess better antibacterial activity than that of the uncomplexed Schiff base.

  20. 10 CFR 51.55 - Environmental report-standard design certification.

    Science.gov (United States)

    2010-01-01

    ... costs and benefits of severe accident mitigation design alternatives, and the bases for not incorporating severe accident mitigation design alternatives in the design to be certified. (b) Each applicant... either renders a severe accident mitigation design alternative previously rejected in an environmental...